WorldWideScience

Sample records for project washington department

  1. Decommissioning project readiness reviews at the Department of Energy's Hanford, Washington, Site

    International Nuclear Information System (INIS)

    Speer, D.R.; Holmes, P.A.

    1987-01-01

    Two Hanford Site contractors independently formulated readiness review methods to prepare for decontamination and decommissioning (D and D) projects. One readiness review method provided an independent management review process. The other method provided a review by personnel directly involved in the project and concise documentation procedures. A unified system is now used at Hanford which combines the best aspects of both readiness review methods. The unified method assigns category levels based on certain job characteristics. The category assigned to the project then indicates the required level of management review prior to proceeding with the D and D project. In addition, the concise documentation procedures are now used for all category levels

  2. The River Corridor Closure Contract How Washington Closure Hanford is Closing A Unique Department of Energy Project - 12425

    Energy Technology Data Exchange (ETDEWEB)

    Feist, E.T. [Washington Closure Hanford, 2620 Fermi Avenue, Richland, WA 99354 (United States)

    2012-07-01

    Cleanup of the Hanford River Corridor has been one of Hanford Site's top priorities since the early 1990's. This urgency is due to the proximity of hundreds of waste sites to the Columbia River and the groundwater that continues to threaten the Columbia River. In April 2005, the U.S. Department of Energy, Richland Operations Office (DOE-RL) awarded the Hanford River Corridor Closure Contract (RCCC), a cost-plus incentive-fee closure contract with a 2015 end date and first of its kind at Hanford Site, to Washington Closure Hanford (WCH), a limited-liability company owned by URS, Bechtel National, and CH2M HILL. WCH is a single-purpose company whose goal is to safely, compliantly, and efficiently accelerate cleanup in the Hanford River Corridor and reduce or eliminate future obligations to DOE-RL for maintaining long-term stewardship over the site. Accelerated performance of the work-scope while keeping a perspective on contract completion presents challenges that require proactive strategies to support the remaining work-scope through the end of the RCCC. This paper outlines the processes to address the challenges of completing work-scope while planning for contract termination. WCH is responsible for cleanup of the River Corridor 569.8 km{sup 2} (220 mi{sup 2}) of the 1,517.7 km{sup 2} (586 mi{sup 2}) Hanford Site's footprint reduction. At the end of calendar year 2011, WCH's closure implementation is well underway. Fieldwork is complete in three of the largest areas within the RCCC scope (Segments 1, 2, and 3), approximately 44.5% of the River Corridor (Figure 3). Working together, DOE-RL and WCH are in the process of completing the 'paper work' that will document the completion of the work-scope and allow DOE-RL to relieve WCH of contractual responsibilities and transition the completed areas to the Long-Term Stewardship Program, pending final action RODs. Within the next 4 years, WCH will continue to complete cleanup of the River

  3. Yakima/Klickitat Fisheries Project; Washington Department of Fish and Wildlife Policy/Technical Involvement and Planning, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Easterbrooks, John A.; Pearsons, Todd N. (Washington Department of Fish and Wildlife, Olympia, WA)

    2003-03-01

    The Yakima/Klickitat Fisheries Project (YKFP) is a supplementation project sponsored by the Northwest Power Planning Council (Columbia River Basin Fish and Wildlife Program 1994, Measure 7.4K). The objectives of the YKFP are: (1) to test the hypothesis that new supplementation techniques can be used in the Yakima River Basin to increase natural production and to improve harvest opportunities while maintaining the long-term genetic fitness of the wild and native salmonid populations and keeping adverse ecological interactions within acceptable limits (Yakima Fisheries Project Final Environment Impact Statement, 1996); (2) provide knowledge about the use of supplementation, so that it may be used to mitigate effects on anadromous fisheries throughout the Columbia River Basin; (3) to maintain and improve the quantity and productivity of salmon and steelhead habitat, including those areas made accessible by habitat improvements; (4) to ensure that Project implementation remains consistent with the Council's Fish and Wildlife Program; and (5) to implement the Project in a prudent and environmentally sound manner. Current YKFP operations have been designed to test the principles of supplementation (Busack et al. 1997). The Project's experimental design has focused on the following critical uncertainties affecting supplementation: (1) The survival and reproductive success of hatchery fish after release from the hatchery; (2) The impacts of hatchery fish as they interact with non-target species and stocks; and, (3) The effects of supplementation on the long-term genetic fitness of fish stocks. The YKFP endorses an adaptive management policy applied through a project management framework as described in the Yakima/Klickitat Fisheries Project Planning Status Report (1995), Fast and Craig (1997), Clune and Dauble 1991. The project is managed by a Policy Group consisting of a representative of the Yakama Nation (YN, lead agency) and a representative of the Washington

  4. Yakima/Klickitat Fisheries Project; Washington Department of Fish and Wildlife Policy/Technical Involvement and Planning, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Pearsons, Todd N.; Easterbrooks, John A. (Washington Department of Fish and Wildlife, Olympia, WA)

    2003-09-01

    Wildlife Program; and (5) to implement the Project in a prudent and environmentally sound manner. Current YKFP operations have been designed to test the principles of supplementation (Busack et al. 1997). The Project's experimental design has focused on the following critical uncertainties affecting supplementation: (1) The survival and reproductive success of hatchery fish after release from the hatchery; (2) The impacts of hatchery fish as they interact with non-target species and stocks; and, (3) The effects of supplementation on the long-term genetic fitness of fish stocks. The YKFP endorses an adaptive management policy applied through a project management framework as described in the Yakima/Klickitat Fisheries Project Planning Status Report (1995), Fast and Craig (1997), and Clune and Dauble 1991. The project is managed by a Policy Group consisting of a representative of the Yakama Nation (YN, lead agency) and a representative of the Washington Department of Fish and Wildlife (WDFW). The functions of the parties are described in an MOU between the YN and the WDFW. A Scientific and Technical Advisory Committee (STAC) consisting of one representative from each management entity reports to the Policy Group and provides technical input on policy and other issues. Additional committee's, such as the Monitoring Implementation and Planning Team (MIPT), serve at the discretion of STAC. The Policy Group and STAC meet periodically (usually monthly) to conduct the business of the YKFP. Although the YKFP is an all stocks initiative (BPA 1996), most effort to date has been directed at spring chinook salmon and coho salmon. This report is a compilation of the year's activities between August 1, 2002 and July 31, 2003. The Yakama Nation's portion of the YKFP is presented in another report. All findings should be considered preliminary until data collection is completed or the information is published in a peer-reviewed journal. Pearsons and Easterbrooks (2003

  5. State of Washington Department of Health Radioactive air emissions notice of construction phase 1 for spent nuclear fuel project - cold vacuum drying facility, project W-441

    Energy Technology Data Exchange (ETDEWEB)

    Turnbaugh, J.E.

    1996-08-15

    This notice of construction (NOC) provides information regarding the source and the estimated annual possession quantity resulting from operation of the Cold Vacuum Drying Facility (CVDF). Additional details on emissions generated by the operation of the CVDF will be discussed again in the Phase 11 NOC. This document serves as a NOC pursuant to the requirements of WAC 246-247-060 for the completion of Phase I NOC, defined as the pouring of concrete for the foundation flooring, construction of external walls, and construction of the building excluding the installation of CVDF process equipment. A Phase 11 NOC will be submitted for approval prior to installing and is defined as the completion of the CVDF, which consisted installation of process equipment, air emissions control, and emission monitoring equipment. About 80 percent of the U.S. Department of Energy`s spent nuclear fuel (SNF) inventory is stored under water in the Hanford Site K Basins. Spent nuclear fuel in the K West Basin is contained in closed canisters while the SNF in the K East Basin is in open canisters, which allow free release of corrosion products to the K East Basin water.

  6. 77 FR 11582 - Notice of Inventory Completion: Central Washington University Department of Anthropology...

    Science.gov (United States)

    2012-02-27

    ...: Central Washington University Department of Anthropology, Ellensburg, WA AGENCY: National Park Service, Interior. ACTION: Notice. SUMMARY: The Central Washington University Department of Anthropology has... Central Washington University Department of Anthropology. Repatriation of the human remains and associated...

  7. 77 FR 15802 - Notice of Inventory Completion: Central Washington University Department of Anthropology...

    Science.gov (United States)

    2012-03-16

    ...: Central Washington University Department of Anthropology, Ellensburg, WA AGENCY: National Park Service, Interior. ACTION: Notice. SUMMARY: The Central Washington University Department of Anthropology has... contact the Central Washington University Department of Anthropology. Repatriation of the human remains to...

  8. 75 FR 14463 - Notice of Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA

    Science.gov (United States)

    2010-03-25

    ... Washington, Department of Anthropology, Seattle, WA AGENCY: National Park Service, Interior. ACTION: Notice... University of Washington, Department of Anthropology, Seattle, WA. The human remains were removed from... University of Washington, Department of Anthropology and Burke Museum staff in consultation with...

  9. 75 FR 14462 - Notice of Inventory Completion: Central Washington University, Department of Anthropology...

    Science.gov (United States)

    2010-03-25

    ... Washington University, Department of Anthropology, Ellensburg, WA, and Thomas Burke Memorial Washington State... Washington University, Department of Anthropology, Ellensburg, WA, and the Thomas Burke Memorial Washington... Anthropology, Central Washington University, Ellensburg, WA 98926-7544, telephone (509) 963-2671 or Dr. Peter...

  10. 77 FR 51563 - Notice of Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA

    Science.gov (United States)

    2012-08-24

    ... Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA AGENCY: National... Anthropology, has completed an inventory of human remains and associated funerary objects, in consultation with... of Washington, Department of Anthropology. Disposition of the human remains and associated funerary...

  11. Physician Assistants and Nurse Practitioners in Rural Washington Emergency Departments.

    Science.gov (United States)

    Nelson, Scott C; Hooker, Roderick S

    2016-06-01

    One role of physician assistants (PAs) and nurse practitioners (NPs) is to meet the growing demand for access to rural health care. Critical Access Hospitals, those with less than 25 beds, are usually located in rural communities, often providing continuity of care that clinics cannot deliver. Because little is known about staffing in these small hospital emergency departments, an exploratory study was undertaken using a mixed-methods approach. In Washington State, 18 of the 39 Critical Access Hospitals staff their emergency departments with PAs and NPs. Utilization data were collected through structured interviews by phone or in person on site. Most PAs and NPs lived within the community and staffing tended to be either 24 hours in-house or short notice if they lived or worked nearby. Emergency department visits ranged from 200 to 25,000 per year. All sites were designated level V or IV trauma centers and often managed cardiac events, significant injuries and, in some larger settings, obstetrics. In most instances, PAs were the sole providers in the emergency departments, albeit with physician backup and emergency medical technician support if a surge of emergency cases arose. Two-thirds of the PAs had graduated within the last 5 years. Most preferred the autonomy of the emergency department role and all expressed job satisfaction. Geographically, the more remote a Washington State Critical Access Hospital is, the more likely it will be staffed by PAs/NPs. The diverse utilization of semiautonomous PAs and NPs and their rise in rural hospital employment is a new workforce observation that requires broader investigation.

  12. 78 FR 25471 - Notice of Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA

    Science.gov (United States)

    2013-05-01

    ....R50000] Notice of Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA..., Department of Anthropology, has completed an inventory of human remains and associated funerary objects, in... Burke Museum acting on behalf of the University of Washington, Department of Anthropology. Disposition...

  13. 78 FR 19297 - Notice of Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA

    Science.gov (United States)

    2013-03-29

    ...-PPWOCRADN0] Notice of Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA..., Department of Anthropology, has completed an inventory of human remains and associated funerary objects, in... Burke Museum acting on behalf of the University of Washington, Department of Anthropology. Disposition...

  14. 78 FR 19298 - Notice of Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA

    Science.gov (United States)

    2013-03-29

    ...-PPWOCRADN0] Notice of Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA..., Department of Anthropology, has completed an inventory of human remains, in consultation with the appropriate... Washington, Department of Anthropology. Disposition of the human remains to the Indian tribes stated below...

  15. 78 FR 22286 - Notice of Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA

    Science.gov (United States)

    2013-04-15

    ....R50000] Notice of Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA..., Department of Anthropology, has completed an inventory of human remains, in consultation with the appropriate... acting on behalf of the University of Washington, Department of Anthropology. If no additional requestors...

  16. 78 FR 5200 - Notice of Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA

    Science.gov (United States)

    2013-01-24

    ... Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA AGENCY: National... Anthropology, has completed an inventory of human remains and associated funerary objects, in consultation with... acting on behalf of the University of Washington, Department of Anthropology. Disposition of the human...

  17. 78 FR 5198 - Notice of Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA

    Science.gov (United States)

    2013-01-24

    ... Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA AGENCY: National... Anthropology, has completed an inventory of human remains and associated funerary objects, in consultation with... of Washington, Department of Anthropology. Disposition of the human remains to the Indian tribes...

  18. Yakima/Klickitat Fisheries Project: Short Project Overview of Spring Chinook Salmon Supplementation in the Upper Yakima Basin; Washington Department of Fish and Wildlife Policy/Technical Involvement and Planning, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Fast, David E.; Bosch, William J.

    2005-09-01

    The Yakima/Klickitat Fisheries Project (YKFP) is on schedule to ascertain whether new artificial production techniques can be used to increase harvest and natural production of spring Chinook salmon while maintaining the long-term genetic fitness of the fish population being supplemented and keeping adverse genetic and ecological interactions with non-target species or stocks within acceptable limits. The Cle Elum Supplementation and Research Facility (CESRF) collected its first spring chinook brood stock in 1997, released its first fish in 1999, and age-4 adults have been returning since 2001. In these initial years of CESRF operation, recruitment of hatchery origin fish has exceeded that of fish spawning in the natural environment, but early indications are that hatchery origin fish are not as successful at spawning in the natural environment as natural origin fish when competition is relatively high. When competition is reduced, hatchery fish produced similar numbers of progeny as their wild counterparts. Most demographic variables are similar between natural and hatchery origin fish, however hatchery origin fish were smaller-at-age than natural origin fish. Long-term fitness of the target population is being evaluated by a large-scale test of domestication. Slight changes in predation vulnerability and competitive dominance, caused by domestication, were documented. Distribution of spawners has increased as a result of acclimation site location and salmon homing fidelity. Semi-natural rearing and predator avoidance training have not resulted in significant increases in survival of hatchery fish. However, growth manipulations in the hatchery appear to be reducing the number of precocious males produced by the YKFP and consequently increasing the number of migrants. Genetic impacts to non-target populations appear to be low because of the low stray rates of YKFP fish. Ecological impacts to valued non-target taxa were within containment objectives or impacts that

  19. Washington Wildlife Mitigation Projects : Final Programmatic Environmental Assessment and Finding of No Significant Impact.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Washington (State). Dept. of Fish and Wildlife.

    1996-08-01

    Bonneville Power Administration (BPA) proposes to fund the portion of the Washington Wildlife Mitigation Agreement (Agreement) pertaining to wildlife habitat mitigation projects to be undertaken in a cooperative effort with the Washington Department of Fish and Wildlife (WDFW). This Agreement serves to establish a monetary budget funded by BPA for projects proposed by Washington Wildlife Coalition members and approved by BPA to protect, mitigate, and improve wildlife and/or wildlife habitat within the State of Washington that has been affected by the construction of Federal dams along the Columbia River. This Environmental Assessment examines the potential environmental effects of acquiring and/or improving wildlife habitat within five different project areas. These project areas are located throughout Grant County and in parts of Okanogan, Douglas, Adams, Franklin, Kittias, Yakima, and Benton Counties. The multiple projects would involve varying combinations of five proposed site-specific activities (habitat improvement, operation and maintenance, monitoring and evaluation, access and recreation management, and cultural resource management). All required Federal, State, and tribal coordination, permits and/or approvals would be obtained prior to ground-disturbing activities.

  20. Washington wildlife mitigation projects. Final programmatic environmental assessment and finding of no significant impact

    International Nuclear Information System (INIS)

    1996-08-01

    Bonneville Power Administration (BPA) proposes to fund the portion of the Washington Wildlife Mitigation Agreement (Agreement) pertaining to wildlife habitat mitigation projects to be undertaken in a cooperative effort with the Washington Department of Fish and Wildlife (WDFW). This Agreement serves to establish a monetary budget funded by BPA for projects proposed by Washington Wildlife Coalition members and approved by BPA to protect, mitigate, and improve wildlife and/or wildlife habitat within the State of Washington that has been affected by the construction of Federal dams along the Columbia River. This Environmental Assessment examines the potential environmental effects of acquiring and/or improving wildlife habitat within five different project areas. These project areas are located throughout Grant County and in parts of Okanogan, Douglas, Adams, Franklin, Kittias, Yakima, and Benton Counties. The multiple projects would involve varying combinations of five proposed site-specific activities (habitat improvement, operation and maintenance, monitoring and evaluation, access and recreation management, and cultural resource management). All required Federal, State, and tribal coordination, permits and/or approvals would be obtained prior to ground-disturbing activities

  1. 78 FR 5201 - Notice of Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA

    Science.gov (United States)

    2013-01-24

    ... Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA AGENCY: National... Anthropology, has completed an inventory of human remains, in consultation with the appropriate Indian tribes..., Department of Anthropology. Disposition of the human remains to the Indian tribes stated below may occur if...

  2. 78 FR 11673 - Notice of Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA

    Science.gov (United States)

    2013-02-19

    ... Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA AGENCY: National... Anthropology, has completed an inventory of human remains and associated funerary objects, in consultation with... Anthropology. Disposition of the human remains and associated funerary objects to the Indian tribes stated...

  3. Scientific Framework for Stormwater Monitoring by the Washington State Department of Transportation

    Science.gov (United States)

    Sheibley, R.W.; Kelly, V.J.; Wagner, R.J.

    2009-01-01

    The Washington State Department of Transportation municipal stormwater monitoring program, in operation for about 8 years, never has received an external, objective assessment. In addition, the Washington State Department of Transportation would like to identify the standard operating procedures and quality assurance protocols that must be adopted so that their monitoring program will meet the requirements of the new National Pollutant Discharge Elimination System municipal stormwater permit. As a result, in March 2009, the Washington State Department of Transportation asked the U.S. Geological Survey to assess their pre-2009 municipal stormwater monitoring program. This report presents guidelines developed for the Washington State Department of Transportation to meet new permit requirements and regional/national stormwater monitoring standards to ensure that adequate processes and procedures are identified to collect high-quality, scientifically defensible municipal stormwater monitoring data. These include: (1) development of coherent vision and cooperation among all elements of the program; (2) a comprehensive approach for site selection; (3) an effective quality assurance program for field, laboratory, and data management; and (4) an adequate database and data management system.

  4. Quarterly status of Department of Energy projects

    International Nuclear Information System (INIS)

    1982-01-01

    This Quarterly Status of Department of Energy Projects is prepared by the Office of project and Facilities Management, MA-30. The report is designed to provide Department of Energy (DOE) management officials with a summary of the important baseline data that exists in the DOE project data base. This data base is maintained chiefly from periodic field management reports required by DOE Order 5700.4. Since most of the current estimates in this report are from field project managers, they do not necessarily have full Headquarters approval. The current budget data sheet estimates that appear in the report are considered appropriate for reporting external to the Department and reflect the President's FY 1983 Budget to Congress. Moneys allocated and estimated costs, and the construction status are tabulated for projects under the subject categories of: conservation and renewable energy; defense programs; environmental protection, safety and emergency preparedness; energy research; defense programs; nuclear energy; and management and administration

  5. Climate Change Education at the University of Washington: Bridging Academic Degrees, Departments and Disciplines

    Science.gov (United States)

    Thompson, L.; Bertram, M. A.

    2012-12-01

    Education on climate change occurs in many departments at large research universities, but providing a coordinated educational experience for students in this topic is challenging. Departmental boundaries, accounting for student credit hours, and curricula inertia create roadblocks to the creation of interdisciplinary curriculum for both graduate and undergraduate students. We describe a hierarchy of interdisciplinary programs that reach students from seniors in high school to graduate students, targeting students from a variety of disciplines. The UWHS (University of Washington in the High School) program allows high school teachers to be trained to teach UW courses to their own high school students at their own school. The students who enroll receive a UW grade and credit for the course (as well as high school credit). A UWHS course on Climate and Climate Change (Atmospheric Sciences 211) was created in 2011 supported by training to high school science teachers on the fundamentals of climate science. For the 2012-13 academic year we anticipate at least 5 schools in Washington State will be offering this course. Once students matriculate at UW, 211 serves as a prerequisite for the Climate Minor that began in 2011. The minor is hosted by the departments of Atmospheric Sciences, Earth and Space Sciences and Oceanography, offering instruction in three focus areas: climate chemistry and biology, the physical climate, and past climate and ice. Students also take an integrative seminar where they are required to communicate to both scientific and non-scientific audiences some topic in climate science. Students enrolled in graduate programs at UW can participate in the Graduate Certificate in Climate Science that began 2008. The certificate gives students instruction in climate science covering the same topic areas as the minor and with a capstone project where student communicate some aspect of climate science to a non-physical science audience. Projects have included

  6. Ford Hatchery; Washington Department of Fish and Wildlife Fish Program, Hatcheries Division, Annual Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    Lovrak, Jon; Ward, Glen

    2004-01-01

    Bonneville Power Administration's participation with the Washington Department of Fish and Wildlife, Ford Hatchery, provides the opportunity for enhancing the recreational and subsistence kokanee fisheries in Banks Lake. The artificial production and fisheries evaluation is done cooperatively through the Spokane Hatchery, Sherman Creek Hatchery (WDFW), Banks Lake Volunteer Net Pen Project, and the Lake Roosevelt Fisheries Evaluation Program. Ford Hatchery's production, together with the Sherman Creek and the Spokane Tribal Hatchery, will contribute to an annual goal of one million kokanee yearlings for Lake Roosevelt and 1.4 million kokanee fingerlings and fry for Banks Lake. The purpose of this multi-agency program is to restore and enhance kokanee salmon and rainbow trout populations in Lake Roosevelt and Banks Lake due to Grand Coulee Dam impoundments. The Ford Hatchery will produce 9,533 lbs. (572,000) kokanee annually for release as fingerlings into Banks Lake in October. An additional 2,133 lbs. (128,000) kokanee will be transferred to net pens on Banks Lake at Electric City in October. The net pen raised kokanee will be reared through the fall, winter, and early spring to a total of 8,533 lbs and released in May. While the origin of kokanee comes from Lake Whatcom, current objectives will be to increase the use of native (or, indigenous) stocks for propagation in Banks Lake and the Upper Columbia River. Additional stocks planned for future use in Banks Lake include Lake Roosevelt kokanee and Meadow Creek kokanee. The Ford Hatchery continues to produce resident trout (80,584 lb. per year) to promote the sport fisheries in trout fishing lakes in eastern Washington (WDFW Management, Region 1). Operation and maintenance funding for the increased kokanee program was implemented in FY 2001 and scheduled to continue through FY 2010. Funds from BPA allow for an additional employee at the Ford Hatchery to assist in the operations and maintenance associated

  7. Opportunities for addressing laminated root rot caused by Phellinus sulphuracens in Washington's forests: A Report from the Washington State Academy of Sciences in cooperation with the Washington State Department of Natural Resources

    Science.gov (United States)

    R. James Cook; Robert L. Edmonds; Ned B. Klopfenstein; Willis Littke; Geral McDonald; Daniel Omdahl; Karen Ripley; Charles G. Shaw; Rona Sturrock; Paul Zambino

    2013-01-01

    This report from the Washington State Academy of Sciences (WSAS) is in response to a request from the Washington State Department of Natural Resources (DNR) to "identify approaches and opportunities ripe for research on understanding and managing root diseases of Douglas-fir." Similar to the process used by the National Research Council, the WSAS upon...

  8. Security, Violent Events, and Anticipated Surge Capabilities of Emergency Departments in Washington State

    Science.gov (United States)

    Weyand, Jonathan S.; Junck, Emily; Kang, Christopher S.; Heiner, Jason D.

    2017-01-01

    Introduction Over the past 15 years, violent threats and acts against hospital patients, staff, and providers have increased and escalated. The leading area for violence is the emergency department (ED) given its 24/7 operations, role in patient care, admissions gateway, and center for influxes during acute surge events. This investigation had three objectives: to assess the current security of Washington State EDs; to estimate the prevalence of and response to threats and violence in Washington State EDs; and to appraise the Washington State ED security capability to respond to acute influxes of patients, bystanders, and media during acute surge events. Methods A voluntary, blinded, 28-question Web-based survey developed by emergency physicians was electronically delivered to all 87 Washington State ED directors in January 2013. We evaluated responses by descriptive statistical analyses. Results Analyses occurred after 90% (78/87) of ED directors responded. Annual censuses of the EDs ranged from violent threats or acts occurring in their ED. Of these, 93% were directed towards nursing staff, 90% towards physicians, 74% towards security personnel, and 51% towards administrative personnel. Nearly half (48%) noted incidents directed towards another patient, and 50% towards a patient’s family or friend. These events were variably reported to the hospital administration. After an acute surge event, 35% believed the initial additional security response would not be adequate, with 26% reporting no additional security would be available within 15 minutes. Conclusion Our study reveals the variability of ED security staffing and a heterogeneity of capabilities throughout Washington State. These deficiencies and vulnerabilities highlight the need for other EDs and regional emergency preparedness planners to conduct their own readiness assessments. PMID:28435498

  9. U.S. Department of Energy Hydrogen and Fuel Cells Program 2014 Annual Merit Review and Peer Evaluation Report: June 16-20, 2014, Washington, D.C.

    Energy Technology Data Exchange (ETDEWEB)

    2014-10-01

    The fiscal year (FY) 2014 U.S. Department of Energy (DOE) Hydrogen and Fuel Cells Program Annual Merit Review and Peer Evaluation Meeting (AMR), in conjunction with DOE's Vehicle Technologies Office AMR, was held from June 16-20, 2014, at the Washington Marriott Wardman Park in Washington, D.C. This report is a summary of comments by AMR peer reviewers about the hydrogen and fuel cell projects funded by DOE's Office of Energy Efficiency and Renewable Energy (EERE).

  10. MSFC Propulsion Systems Department Knowledge Management Project

    Science.gov (United States)

    Caraccioli, Paul A.

    2007-01-01

    This slide presentation reviews the Knowledge Management (KM) project of the Propulsion Systems Department at Marshall Space Flight Center. KM is needed to support knowledge capture, preservation and to support an information sharing culture. The presentation includes the strategic plan for the KM initiative, the system requirements, the technology description, the User Interface and custom features, and a search demonstration.

  11. Draft Environmental Impact Statement: Proposed Tenaska, Washington II Generation Project

    International Nuclear Information System (INIS)

    1993-08-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Power Partners, Inc. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and evaluated in the Environmental Impact Statement (EIS) include: potential air quality impacts such as emissions and their contribution to the ''greenhouse'' effect; potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields, and potential water quality impacts such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is particularly controversial. The EIS is being mailed to numerous agencies, groups, and individuals. There will be a 45-day comment period, during which a Public Hearing will be held

  12. Leven estuary project. Fisheries Department final report

    OpenAIRE

    Bayliss, B.D.

    1997-01-01

    This is the report on the Leven estuary project: Fisheries Department final report produced by the Environment Agency North West in 1997. This report contains information about Leven estuary, river Leven catchment, river Crake catchment and the Ulverston Discharges. The Leven estuary is characterised by being very shallow, and shares the extremely variable tides and currents that characterize the whole of Morecambe Bay. There was little detailed knowledge of the impact on the Leven estuary, a...

  13. Sherman Creek Hatchery; Washington Department of Fish and Wildlife Fish Program, 2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Lovrak, Jon (Washington Department of Fish and Wildlife, Fish Management Program, Hatcheries Division, Ford, WA); Combs, Mitch (Washington Department of Fish and Wildlife, Fish Management Program, Hatcheries Division, Kettle Falls, WA)

    2004-01-01

    Sherman Creek Hatchery's primary objective is the restoration and enhancement of the recreational and subsistence fishery in Lake Roosevelt and Banks Lake. The Sherman Creek Hatchery (SCH) was designed to rear 1.7 million kokanee fry for acclimation and imprinting during the spring and early summer. Additionally, it was designed to trap all available returning adult kokanee during the fall for broodstock operation and evaluation. Since the start of this program, the operations on Lake Roosevelt have been modified to better achieve program goals. The Washington Department of Fish and Wildlife, Spokane Tribe of Indians and the Colville Confederated Tribes form the interagency Lake Roosevelt Hatcheries Coordination Team (LRHCT) which sets goals and objectives for both Sherman Creek and the Spokane Tribal Hatchery. The LRHCT also serves to coordinate enhancement efforts on Lake Roosevelt and Banks Lake. Since 1994 the kokanee fingerling program has changed to yearling releases. By utilizing both the hatcheries and additional net pens, up to 1,000,000 kokanee yearlings can be reared and released. The construction and operation of twenty net pens in 2001 enabled the increased production. Another significant change has been to rear up to 300,000 rainbow trout fingerling at SCH from July through October, for stocking into the volunteer net pens. This enables the Spokane Tribal Hatchery (STH) to rear additional kokanee to further the enhancement efforts on Lake Roosevelt. Current objectives include increased use of native tributary stocks where available for propagation into Upper Columbia River Basin waters. The Lake Roosevelt Fisheries Evaluation Program (LRFEP) is responsible for monitoring and evaluation on the Lake Roosevelt Projects. From 1988 to 1998, the principal sport fishery on Lake Roosevelt has shifted from walleye to include rainbow trout and kokanee salmon (Underwood et al. 1997, Tilson and Scholz 1997). The angler use, harvest rates for rainbow and

  14. U.S. Department of Energy Hydrogen and Fuel Cells Program 2016 Annual Merit Review and Peer Evaluation Report: June 6-10, 2016, Washington, DC

    Energy Technology Data Exchange (ETDEWEB)

    Popovich, Neil

    2016-10-01

    The fiscal year 2016 U.S. Department of Energy (DOE) Hydrogen and Fuel Cells Program Annual Merit Review and Peer Evaluation Meeting (AMR), in conjunction with DOE's Vehicle Technologies Office AMR, was held from June 6-10, 2015, in Washington, D.C.. This report is a summary of comments by AMR peer reviewers about the hydrogen and fuel cell projects funded by DOE's Office of Energy Efficiency and Renewable Energy.

  15. MANHATTAN PROJECT B REACTOR HANFORD WASHINGTON [HANFORD'S HISTORIC B REACTOR (12-PAGE BOOKLET)

    Energy Technology Data Exchange (ETDEWEB)

    GERBER MS

    2009-04-28

    The Hanford Site began as part of the United States Manhattan Project to research, test and build atomic weapons during World War II. The original 670-square mile Hanford Site, then known as the Hanford Engineer Works, was the last of three top-secret sites constructed in order to produce enriched uranium and plutonium for the world's first nuclear weapons. B Reactor, located about 45 miles northwest of Richland, Washington, is the world's first full-scale nuclear reactor. Not only was B Reactor a first-of-a-kind engineering structure, it was built and fully functional in just 11 months. Eventually, the shoreline of the Columbia River in southeastern Washington State held nine nuclear reactors at the height of Hanford's nuclear defense production during the Cold War era. The B Reactor was shut down in 1968. During the 1980's, the U.S. Department of Energy began removing B Reactor's support facilities. The reactor building, the river pumphouse and the reactor stack are the only facilities that remain. Today, the U.S. Department of Energy (DOE) Richland Operations Office offers escorted public access to B Reactor along a designated tour route. The National Park Service (NPS) is studying preservation and interpretation options for sites associated with the Manhattan Project. A draft is expected in summer 2009. A final report will recommend whether the B Reactor, along with other Manhattan Project facilities, should be preserved, and if so, what roles the DOE, the NPS and community partners will play in preservation and public education. In August 2008, the DOE announced plans to open B Reactor for additional public tours. Potential hazards still exist within the building. However, the approved tour route is safe for visitors and workers. DOE may open additional areas once it can assure public safety by mitigating hazards.

  16. Radiological Survey Results for Areas A1 North, A5A, A6, and B2 at the Molycorp Washington Remediation Project, Washington, Pennsylvania

    International Nuclear Information System (INIS)

    W.C. Adams

    2007-01-01

    Perform radiological surveys of the Molycorp Washington Remediation Project (MWRP) facility in Washington, Pennsylvania. The U.S. Nuclear Regulatory Commission (NRC) requested the Oak Ridge Institute for Science and Education (ORISE) to provide limited training pertaining to ORISE radiological soil scanning and sampling procedures to the Pennsylvania Department of Environmental Protection (PADEP) personnel. In addition, the NRC also requested that ORISE perform radiological surveys of the Molycorp Washington Remediation Project (MWRP) facility in Washington, Pennsylvania (Figure 1). ORISE has and will continue to interface with PADEP personnel in a joint effort to perform confirmatory radiological surveys, consisting of gamma scans and soil sampling, at the MWRP facility. PADEP personnel will continue to submit soil samples that they collect to ORISE for analyses. PADEP sample results, along with ORISE results, will be provided to the NRC and PADEP so that decisions regarding the radiological status of the surveyed areas can be determined. ORISE performed radiological surveys during the period of November 28 and 29, 2006. The survey unit (SU) available for ORISE radiological survey activities was Area A1 North. The MWRP final status survey (FSS) results for Area A1 North were reviewed prior to these survey activities. Prior to ORISE's survey activities, PADEP personnel had performed radiological surveys and collected soil samples from SU Areas A5A and A6. These samples were provided to ORISE for analyses while on site. After the ORISE radiological surveys, PADEP personnel collected soil samples from SU Areas A2 and B2 and these samples were shipped to ORISE for analyses in January 2007. Figure 2 depicts the MWRP Areas A through D; ORISE and PADEP personnel performed survey activities in portions of Areas A and B. For interlaboratory comparison analyses with MWRP's site contractor, Malcolm Pirnie (MP), ORISE requested soil samples from the Area A1 soil stockpiles

  17. 77 FR 38388 - Notice of Decision to Grant Buy America Waiver to Washington Department of Transportation to...

    Science.gov (United States)

    2012-06-27

    ... DEPARTMENT OF TRANSPORTATION Federal Railroad Administration Notice of Decision to Grant Buy America Waiver to Washington Department of Transportation to Purchase Vossloh 101-LV Concrete Rail Ties...: Notice of decision to grant Buy America waiver. SUMMARY: FRA is issuing this notice to advise the public...

  18. The pre-history of the University of Washington Astronomy Department: 1891-1965

    Science.gov (United States)

    Sullivan, Woodruff T.

    2015-01-01

    The University of Washington (UW) created its first Professor of Astronomy (within the Mathematics Department) in 1891, only two years after Washington itself became a state. Joseph Taylor bought a Warner & Swasey refractor with a 6-inch John Brashear lens, and installed it in a dome in 1895 when the university moved to a new campus outside of downtown Seattle. The small observatory became only the second building on the present campus, and is listed on the State Register of Historical Buildings. Over succeeding decades, Taylor was followed, amongst others, by Samuel Boothroyd (who after nine years left for Cornell in 1921) and for two years by Herman Zanstra (of "Zanstra method" fame). In 1928 Theodor Jacobsen joined the faculty after having obtained his Ph.D. at the University of California (Berkeley) and spending two years as a staff member at Lick Observatory. Jacobsen's research over the years focused on the spectra and motions of variable stars, especially of the Cepheid type. In the 1970s Jacobsen published a paper about secular changes in one particular Cepheid variable still using his own data extending as far back as the 1920s. For 42 years until his retirement, Jacobsen taught courses in astronomy (although there never was an astronomy major and only two graduate degrees were ever awarded), navigation, and a variety of mathematical topics. In the decade following Sputnik and the birth of NASA, UW astronomy ceased to be a one-man effort with the creation of a modern department, founding of a graduate program, and hiring of two new faculty members: George Wallerstein and Paul Hodge came from Berkeley in 1965 and are both still engaged in research 50 years later.

  19. Washington State Need Grant: Less-Than-Halftime Pilot Project (SHB 1345)

    Science.gov (United States)

    Washington Higher Education Coordinating Board, 2006

    2006-01-01

    The 2005 Washington State Legislature authorized, through Substitute House Bill 1345, a two-year pilot project allowing eligible students, who enroll for four or five credits in a term, to receive the State Need Grant (SNG). Several important policy considerations emerged during the pilot project. Board staff explored these issues with financial…

  20. Draft site characterization analysis of the site characterization report for the Basalt Waste Isolation Project, Hanford, Washington Site. Main report and Appendices A through D

    International Nuclear Information System (INIS)

    1983-03-01

    On November 12, 1982, the US Department of Energy submitted to the US Nuclear Regulatory Commission the Site Characterization Report for the Basalt Waste Isolation Project (DOE/RL 82-3). The Basalt Waste Isolation Project is located on DOE's Hanford Reservation in the State of Washington. NUREG-0960 contains the detailed analysis, by the NRC staff, of the site characterization report. Supporting technical material is contained in Appendices A through W

  1. The Zoology Department at Washington University (1944-1954): from undergraduate to graduate studies with Viktor Hamburger.

    Science.gov (United States)

    Dunnebacke, T H

    2001-04-01

    Beginning from an undergraduate's perspective and continuing through graduate school, this student's experiences in the Department of Zoology at Washington University in St. Louis, Missouri was a time of many rewarding experiences. Now, on this occasion of his 100th birthday, I wish to express my appreciation to the Chairman, Dr. Viktor Hamburger, for his teachings, his encouragement, and his friendship that has lasted over the past 56 years.

  2. Sherman Creek Hatchery; Washington Department of Fish and Wildlife Fish Program, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Combs, Mitch (Washington Department of Fish and Wildlife, Kettle Falls, WA)

    2002-01-01

    Sherman Creek Hatchery's primary objective is the restoration and enhancement of the recreational and subsistence fishery in Lake Roosevelt and Banks Lake. The Sherman Creek Hatchery (SCH) was designed to rear 1.7 million kokanee fry for acclimation and imprinting during the spring and early summer. Additionally, it was designed to trap all available returning adult kokanee during the fall for broodstock operations and evaluations. Since the start of this program, the operations on Lake Roosevelt have been modified to better achieve program goals. The Washington Department of Fish and Wildlife, Spokane Tribe of Indians and the Colville Confederated Tribe form the interagency Lake Roosevelt Hatcheries Coordination Team (LRHCT) which sets goals and objectives for both Sherman Creek and the Spokane Tribal Hatchery and serves to coordinate enhancement efforts on Lake Roosevelt and Banks Lake. The primary changes have been to replace the kokanee fingerling program with a yearling (post smolt) program of up to 1,000,000 fish. To construct and operate twenty net pens to handle the increased production. The second significant change was to rear up to 300,000 rainbow trout fingerling at SCH from July through October, for stocking into the volunteer net pens. This enables the Spokane Tribal Hatchery (STH) to rear additional kokanee to further the enhancement efforts on Lake Roosevelt. Current objectives include increased use of native/indigenous stocks where available for propagation into Upper Columbia River Basin Waters. Monitoring and evaluation is preformed by the Lake Roosevelt Fisheries Monitoring Program. From 1988 to 1998, the principle sport fishery on Lake Roosevelt has shifted from walleye to include rainbow trout and kokanee salmon (Underwood et al. 1997, Tilson and Scholz 1997). The angler use, harvest rates for rainbow and kokanee and the economic value of the fishery has increased substantially during this 10-year period. The most recent information from

  3. A new era in science at Washington University, St. Louis: Viktor Hamburger's zoology department in the 1940's.

    Science.gov (United States)

    Carson, H L

    2001-04-01

    In the early 1940s, the administration of the College of Arts and Sciences at Washington University, St. Louis was firmly in the hands of classical scholars who were not inclined to promote the development of modern research on scientific subjects. Funds supporting research in biology favored the School of Medicine and the Missouri Botanical Garden. Viktor Hamburger arrived at Washington University in 1935. At about the time he became the Acting Chairman of Zoology in 1942, research work in the biological departments began a dramatic surge that has continued to this day. For 65 years under his counsel and leadership, basic biology has thrived at this fine institution. As an early faculty recruit, I recount here a few personal recollections from those formative years.

  4. Data from monitoring of shellfish for Paralytic Shellfish Poisoning (PSP) and Domoic Acid Poisoning (DAP) by the Washington State Department of Health, 1989-1999 (NODC Accession 0000580)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The state of Washington routinely experiences seasonal restrictions on commercial and recreational shellfish harvest due to two toxic phytoplankton syndromes,...

  5. Standardizing instream flow requirements at hydropower projects in the Cascade Mountains, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Smith, I.M.; Sale, M.J.

    1993-06-01

    Instream flow requirements are common mitigation measures instituted in the bypassed reaches of hydroelectric diversion projects. Currently, there are two extremes among the ways to determine instream flow requirements: generic standard-setting methods and detailed, habitat-based, impact assessment methods such as the Instream Flow Incremental Methodology (IFIM). Data from streams in Washington state show a consistent pattern in the instream flow requirements resulting from the IFIM. This pattern can be used to refine the simpler standard-setting approaches and thereby provide better estimates of flow needs during early stages of project design.

  6. Projected health impacts of heat events in Washington State associated with climate change.

    Science.gov (United States)

    Isaksen, Tania Busch; Yost, Michael; Hom, Elizabeth; Fenske, Richard

    2014-01-01

    Climate change is predicted to increase the frequency and duration of extreme-heat events and associated health outcomes. This study used data from the historical heat-health outcome relationship, and a unique prediction model, to estimate mortality for 2025 and 2045. For each one degree change in humidex above threshold, we find a corresponding 1.83% increase in mortality for all ages, all non-traumatic causes of death in King County, Washington. Mortality is projected to increase significantly in 2025 and 2045 for the 85 and older age group (2.3-8.0 and 4.0-22.3 times higher than baseline, respectively).

  7. The project scientist's role in scientific spacecraft project management. M.S. Thesis - George Washington Univ.

    Science.gov (United States)

    Eller, E. L.

    1976-01-01

    The project scientists is in a position which rates very high in terms of behavioral study recommendations. His influence over objectives is generally considered to be important. He is highly autonomous in a moderately coordinated environment. He has diverse managerial and technical functions and the performance of these functions require him to grow beyond his role as an experimenter. However, the position within the line organization for those interviewed is also very stimulating, rating almost as high by the same criteria. The role of project scientist may not be the dominant means of professional growth for the experienced scientific investigators. The influence which the project scientist exerts on the project and the stimulation of that position for him are determined largely by his position outside the defined project scientist role. The role of the project scientist is changing because the environment of those who become project scientists is changing.

  8. Aerial radiological survey of the Washington. Date of survey: July 1982 Public Power Supply System (WPPSS) Nuclear Project and surrounding area, Richland, Washington

    International Nuclear Information System (INIS)

    1983-07-01

    An aerial radiological survey was performed from 14 to 20 July 1982 over a 270-square-kilometer area centered on the Washington Public Power Supply System (WPPSS) Nuclear Project located near Richland, Washington. All gamma ray data were collected by flying parallel lines spaed 152 meters (500 feet) apart at an altitude of 91 meters (300 feet) above ground level. Count rates obtained from the aerial platform were converted to total external exposure rates at 1 meter above the ground and are presented in the form of an isoradiation contour map. The observed exposure rates ranged from 5 to 15 microroentgens per hour (μR/h) with the average background ranging from 9 to 12μR/h. These values include an estimated cosmic ray contribution of 3.7 μR/h. The exposure rates obtained from ground-based measurements taken in background locations within the survey area displayed positive agreement the aerial data

  9. Modeling man: the monkey colony at the Carnegie Institution of Washington's Department of Embryology, 1925-1971.

    Science.gov (United States)

    Wilson, Emily K

    2012-01-01

    Though better recognized for its immediate endeavors in human embryo research, the Carnegie Department of Embryology also employed a breeding colony of rhesus macaques for the purposes of studying human reproduction. This essay follows the course of the first enterprise in maintaining a primate colony for laboratory research and the overlapping scientific, social, and political circumstances that tolerated and cultivated the colony's continued operation from 1925 until 1971. Despite a new-found priority for reproductive sciences in the United States, by the early 1920s an unfertilized human ovum had not yet been seen and even the timing of ovulation remained unresolved. Progress would require an organized research approach that could extend beyond the limitations of working with scant and inherently restrictive human subjects or with common lab mammals like mice. In response, the Department of Embryology, under the Carnegie Institution of Washington (CIW), instituted a novel methodology using a particular primate species as a surrogate in studying normal human reproductive physiology. Over more than 40 years the monkey colony followed an unpremeditated trajectory that would contribute fundamentally to discoveries in human reproduction, early embryo development, reliable birth control methods, and to the establishment of the rhesus macaque as a common model organism.

  10. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 2: Public Involvement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the public involvement process is the Comment Report which follows in part of this volume on Public Involvement.

  11. Plant Biology and Biogeochemistry Department annual project report 1999

    DEFF Research Database (Denmark)

    Jensen, A.; Gissel Nielsen, G.; Giese, H.

    2000-01-01

    The Department of Plant Biology and Biogeochemistry is engaged in basic and applied research to improve the scientific knowledge of developing new methods and technology for the future, environmentally benign industrial and agricultural production, thusexerting less stress and strain...... of Biomass, 3. DLF-Risø Biotechnology, 4. Plant Genetics and Epidemiology, 5. Biogeochemistry and 6. Plant Ecosystems and Nutrient Cycling. This electronicversion of the annual report from the Plant Biology and Biogeochemistry Department aims to provide information about the progress in our research. Each...... on the environment. This knowledge will lead to a greater prosperity and welfare for agriculture, industry and consumers in Denmark. The research approach in the Department is mainly experimental and the projects areorganized in six research programmes: 1. Plant-Microbe Symbioses, 2. Plant Products and Recycling...

  12. NRC assessment of the Department of Energy annealing demonstration project

    International Nuclear Information System (INIS)

    Jackson, D.A.; Malik, S.N.

    1997-01-01

    Thermal annealing is the only known method for mitigating the effects of neutron irradiation embrittlement in reactor pressure vessel (RPV) steels. In May 1996, the US Department of Energy (DOE) in conjunction with the American Society of Mechanical Engineers, Westinghouse, Cooperheat, Electric Power Research Institute (with participating utilities), Westinghouse Owner's Group, Consumers Power, Electricite' de France, Duquesne Light and the Central Research Institute of the Electric Power Industry (Japan) sponsored an annealing demonstration project (ADP) at Marble Hill. The Marble Hill Plant, located in Madison, Indiana, is a Westinghouse 4 loop design. The plant was nearly 70% completed when the project was canceled. Hence, the RPV was never irradiated. The paper will present highlights from the NRCs independent evaluation of the Marble Hill Annealing Demonstration Project

  13. 77 FR 72907 - Western Washington Railroad, LLC-Lease and Operation Exemption-City of Tacoma, Department of...

    Science.gov (United States)

    2012-12-06

    ..., 2012, Western Washington Railroad, LLC (WWRR), a Washington limited liability company and noncarrier... allow for interchange with WWRR, BNSF Railway Company, the Puget Sound and Pacific Railroad, and Union Pacific Railroad Company, and also over the entire line for emergency routing. WWRR states that the...

  14. The greening of the U.S. Department of Energy Headquarters, Washington, D.C. Second-year status report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-22

    The Greening of the Department of Energy Headquarters is a comprehensive, multi-year project designed to identify and implement specific actions DOE can take to save energy and money, improve the comfort and productivity of employees, and benefit the environment. It is part of the Administration`s overall effort to promote greening in all of the nation`s federal buildings. Present Clinton started the Greening of the White House in 1993, and similar efforts have been undertaken by the Department of Defense at the Pentagon, the National Park Service at the Presidio, and now the Department of Energy at the Forrestal and Germantown buildings. The Greening of the Department of Energy Headquarters, An Action Plan for Success (Action Plan), unveiled on April 22, 1996, outlined more than 80 action items for DOE`s Forrestal and Germantown buildings. The action items were designed to increase energy efficiency, improve resource management, improve air quality, reduce water use, reduce paper use, improve landscape management, improve maintenance and operational procedures, increase employee participation, and promote education and outreach. In the two years since the Action Plan was introduced, the Department of Energy has made major progress in implementing specific action items designed to target four major subject areas: (1) Energy Efficiency; (2) Resource Management; (3) Air, Water, Landscape, and (4) Human Factors. This report outlines the status of the recommendations of the Action Plan since they were introduced two years ago.

  15. Contents of risk assessments to support the retrieval and closure of tanks for the Washington State Department of Ecology

    International Nuclear Information System (INIS)

    MANN, F.M.

    2003-01-01

    Before the Integrated Mission Acceleration Plan can be performed, risk assessments of various options must be performed for ORP, DOE Headquarters, and the Washington State Dept. of Ecology. This document focuses on the risk assessments for Ecology

  16. Technology integration project: Environmental Restoration Technologies Department Sandia National Laboratories

    International Nuclear Information System (INIS)

    Williams, C.V.; Burford, T.D.

    1996-08-01

    Sandia National Laboratories Environmental Restoration Technologies Department is developing environmental restoration technologies through funding form the US Department of Energy's (DOE's) Office of Science and Technology. Initially, this technology development has been through the Mixed Waste Landfill Integrated Demonstration (MWLID). It is currently being developed through the Contaminant Plume containment and Remediation Focus Area, the Landfill Stabilization Focus Area, and the Characterization, Monitoring, and Sensor Cross-Cutting Program. This Technology Integration Project (TIP) was responsible for transferring MWLID-developed technologies for routine use by environmental restoration groups throughout the DOE complex and commercializing these technologies to the private sector. The MWLID's technology transfer/commercialization successes were achieved by involving private industry in development, demonstration, and technology transfer/commercialization activities; gathering and disseminating information about MWLID activities and technologies; and promoting stakeholder and regulatory involvement. From FY91 through FY95, 30 Technical Task Plans (TTPs) were funded. From these TTPs, the MWLID can claim 15 technology transfer/commercialization successes. Another seven technology transfer/commercialization successes are expected. With the changeover to the focus areas, the TIP continued the technology transfer/commercialization efforts begun under the MWLID

  17. Technology integration project: Environmental Restoration Technologies Department Sandia National Laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Williams, C.V.; Burford, T.D. [Sandia National Labs., Albuquerque, NM (United States). Environmental Restoration Technologies; Allen, C.A. [Tech Reps, Inc., Albuquerque, NM (United States)

    1996-08-01

    Sandia National Laboratories Environmental Restoration Technologies Department is developing environmental restoration technologies through funding form the US Department of Energy`s (DOE`s) Office of Science and Technology. Initially, this technology development has been through the Mixed Waste Landfill Integrated Demonstration (MWLID). It is currently being developed through the Contaminant Plume containment and Remediation Focus Area, the Landfill Stabilization Focus Area, and the Characterization, Monitoring, and Sensor Cross-Cutting Program. This Technology Integration Project (TIP) was responsible for transferring MWLID-developed technologies for routine use by environmental restoration groups throughout the DOE complex and commercializing these technologies to the private sector. The MWLID`s technology transfer/commercialization successes were achieved by involving private industry in development, demonstration, and technology transfer/commercialization activities; gathering and disseminating information about MWLID activities and technologies; and promoting stakeholder and regulatory involvement. From FY91 through FY95, 30 Technical Task Plans (TTPs) were funded. From these TTPs, the MWLID can claim 15 technology transfer/commercialization successes. Another seven technology transfer/commercialization successes are expected. With the changeover to the focus areas, the TIP continued the technology transfer/commercialization efforts begun under the MWLID.

  18. U.S. Department of Energy Wind Turbine Development Projects

    International Nuclear Information System (INIS)

    Migliore, P.G.; Calvert, S.D.

    1999-01-01

    This paper provides an overview of wind-turbine development activities in the Unites States and relates those activities to market conditions and projections. Several factors are responsible for a surge in wind energy development in the United States, including a federal production tax credit, ''green power'' marketing, and improving cost and reliability. More development is likely, as approximately 363 GW of new capacity will be needed by 2020 to meet growing demand and replace retiring units. The U.S. Department of Energy (DOE) is helping two companies develop next-generation turbines intended to generate electricity for $0.025/kWh or less. We expect to achieve this objective through a combination of improved engineering methods and configuration advancements. This should ensure that wind power will compete effectively against advanced combined-cycle plants having projected generating costs of $0.031/kWh in 2005. To address the market for small and intermediate-size wind turbines, DOE is assisting five companies in their attempts to develop new turbines having low capital cost and high reliability. Additional information regarding U.S. wind energy programs is available on the internet site www.nrel.gov/wind/. E-mail addresses for the turbine manufacturers are found in the Acknowledgements

  19. 76 FR 56406 - Science and Technology Reinvention Laboratory Demonstration Project; Department of the Army; Army...

    Science.gov (United States)

    2011-09-13

    ... DEPARTMENT OF DEFENSE Office of the Secretary Science and Technology Reinvention Laboratory Demonstration Project; Department of the Army; Army Research, Development and Engineering Command; Tank... personnel management demonstration project for eligible TARDEC employees. Within that notice the table...

  20. Collaborative effort in Washington state slashes non-essential use of the ED by Medicaid patients, delivering millions in projected savings.

    Science.gov (United States)

    2013-04-01

    Early data suggest a coordinated, state-wide effort has reduced non-essential use of the ED by 10% among Medicaid recipients in Washington state, and is projected to save the state an estimated $31 million in the first year of the approach. The effort includes the adoption of seven best practices by hospitals across the state.These include the creation of an Emergency Department Information Exchange, so that EDs can immediately access a patient's utilization history, strict narcotic prescribing guidelines, and regular feedback reports to hospitals regarding ED utilization patterns. The effort was prompted by threats by the state legislature to limit Medicaid payments for ED visits deemed not medically necessary in the emergency setting. The legislature backed down when emergency physicians in the state countered with their own proposal to reduce nonessential use of the ED. They worked with other health care groups in the state to develop the plan. Data on the first six months of the effort are included in a report to the state legislature by the Washington State Health Care Authority. Among the findings are a 23% reduction in ED visits among Medicaid recipients with five or more visits, a 250% increase in providers who have registered with the state's Prescription Monitoring Program, aimed at identifying patients with narcotic-seeking behavior, and a doubling in the number of shared care plans, intended to improve care coordination. Emergency providers say big challenges remain, including a need for more resources for patients with mental health and dental care needs.

  1. A Partnership for Modeling the Marine Environment of Puget Sound, Washington

    Science.gov (United States)

    2009-03-30

    Northwest National Marine Renewable Energy Center, a joint University of Washington - Oregon State project funded by the U.S. Department of Energy. e. A... Marine Renewable Energy Center (NNMREC), a joint Washington - Oregon State project to investigate extraction of wave and tidal energy sponsored by

  2. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack

    1984-11-01

    This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

  3. Development and Evaluation of an On-Line Educational Module for Volunteer Leaders on Bio-Security in Washington State 4-H Livestock Projects

    Science.gov (United States)

    Stevenson, Jill L.; Moore, Dale A.; Newman, Jerry; Schmidt, Janet L.; Smith, Sarah M.; Smith, Jean; Kerr, Susan; Wallace, Michael; BoyEs, Pat

    2011-01-01

    An on-line module on disease prevention was created for 4-H volunteer leaders who work with livestock projects in Washington to better prepare them to teach youth about bio-security and its importance in 4-H livestock projects. Evaluation of the module and usage statistics since the module's debut were collected and evaluated. The module increases…

  4. Health-hazard-evaluation report HETA 87-376-2018, US Department of Justice, United States Marshals Service, Washington, DC

    Energy Technology Data Exchange (ETDEWEB)

    Reh, C.M.; Klein, M.K.

    1990-03-01

    In response to a request from the United States Marshals Service (SIC-9221) in Washington, D.C. for assistance in testing the effect of renovations to the ventilation system of their indoor firing range, lead (7439921) exposures were measured during handgun qualifying sessions. Each qualifying session of firing consisted of 60 rounds fired in 10 to 12 minutes. Personal breathing zone air samples were taken from three shooters and the range officer. Lead exposure concentrations measured were 2073, 1786, 172, and 142 micrograms of lead per cubic meter of air (microg/cu m). Eight hour time weighted average concentrations were calculated to be 194, 167, 101, and 13microg/cu m, respectively. The three shooters were therefore overexposed to lead. Bulk sampling of the sand from the bullet trap indicated it to be contaminated, containing 41% lead by weight. The authors concluded that a health hazard existed from exposure to lead. The authors recommended changes to improve the ventilation system. Following modification of the system, tests were again conducted and 11 of the 12 samples taken were below the limits of detection for the method used. The authors conclude that after modification, a hazard did not exist during qualifying sessions. The authors recommend specific measures to protect personnel from exposure to lead.

  5. [Loyal frequent users of hospital emergency departments: the FIDUR project].

    Science.gov (United States)

    Fernández Alonso, Cesáreo; Romero Pareja, Rodolfo; Rivas García, Aristides; Jiménez Gallego, Rosa; Majo Carbajo, Yolanda; Aguilar Mulet, Juan Mariano

    2016-02-01

    To describe the characteristics of frequent users of hospital emergency departments and analyze whether characteristics varied in relation to how revisits were distributed over the course of the year studied. Retrospective study of patients over the age of 14 years who were treated in a hospital emergency department at least 10 times in 2013. Patients were identified in 17 public hospitals in the Spanish autonomous community of Madrid. Data related to the first and successive visits were gathered and analyzed by quarter year. We included 2340 patients with a mean (SD) age of 54 (21) years. A total of 1361 (58.%) were women, 1160 (50%) had no concomitant diseases, 1366 (58.2%) were substance abusers, and 25 (1.1%) were homeless. During the first visit, 2038 (87.1%) complained of a recent health problem, and 289 (12.4%) were admitted. Sixty (2.6%) patients concentrated their revisits in a single quarters 335 (14.3%) in 2 quarters, 914 (39.1%) in 3, and 1005 (42.9%) in 4. Patients whose revisits were distributed over more quarters were older (> 65 years), had more concomitant conditions, were on more medications (P women (P = .012) and more likely to have a specific diagnosis (P loyally comes to the same emergency department over the course of a year. Patients whose revisits are dispersed over a longer period have more complex problems and use more resources during their initial visit.

  6. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 1: Environmental Analysis and Technical Appendices.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and in comments on the Draft Environmental Impact Statement (EIS) include: (1) potential air quality impacts, such as emissions and their contribution to the {open_quotes}greenhouse{close_quotes} effect; (2) potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields; and (3) potential water quality and quantity impacts, such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial. The EIS is being mailed to numerous agencies, groups, and individuals (see Section 8.0). There will be a 30-day no-action period before any decisions are made and the Record of Decision is signed.

  7. Millimeter-Wave Radar Field Measurements and Inversion of Cloud Parameters for the 1999 Mt. Washington Icing Sensors Project

    Science.gov (United States)

    Pazmany, Andrew L.; Reehorst, Andrew (Technical Monitor)

    2001-01-01

    The Mount Washington Icing Sensors Project (MWISP) was a multi-investigator experiment with participants from Quadrant Engineering, NOAA Environmental Technology Laboratory (NOAA/ETL), the Microwave Remote Sensing Laboratory (MIRSL) of the University of Massachusetts (UMass), and others. Radar systems from UMass and NOAA/ETL were used to measure X-, Ka-, and W-band backscatter data from the base of Mt. Washington, while simultaneous in-situ particle measurements were made from aircraft and from the observatory at the summit. This report presents range and time profiles of liquid water content and particle size parameters derived from range profiles of radar reflectivity as measured at X-, Ka-, and W-band (9.3, 33.1, and 94.9 GHz) using an artificial neural network inversion algorithm. In this report, we provide a brief description of the experiment configuration, radar systems, and a review of the artificial neural network used to extract cloud parameters from the radar data. Time histories of liquid water content (LWC), mean volume diameter (MVD) and mean Z diameter (MZD) are plotted at 300 m range intervals for slant ranges between 1.1 and 4 km. Appendix A provides details on the extraction of radar reflectivity from measured radar power, and Appendix B provides summary logs of the weather conditions for each day in which we processed data.

  8. Energy Edge, Post-Occupancy Evaluation Project: The Eastgate Corporate Center Bellevue, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Heerwagen, Judith; Loveland, Joel; Quense, Nancy; Barnes, John; Cooksey, Chris; Press, Carreen; Somers, Julian; Shaughnessey, Mary

    1990-06-01

    The Workspace Satisfaction Survey measures occupant satisfaction with the thermal, lighting, acoustical, and air quality aspects of the work environment. In addition to ratings of these ambient environmental features, occupants also rate their satisfaction with a number of functional and aesthetic features of the office environment as well as their satisfaction with specific kinds of workspaces (e.g. computer rooms, the lobby, employee lounge, etc.) Each section on ambient conditions includes questions on the frequency with which people experience particular kinds of discomforts or problems, how much the discomfort bothers them, and how much it interferes with their work. Occupants are also asked to identify how they cope with discomfort or environmental problems, and to what extent these behaviors enable them to achieve more satisfactory conditions. This report documents the results of this survey of the occupants of the Eastgate Corporate Center, Bellevue, Washington. 21 figs., 7 tabs.

  9. Chinook salmon Genetic Stock Identification data - Genetic Stock Identification of Washington Chinook salmon

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This project evaluates data from coded wire tagging with that from parental based tagging to identify stock of origin for Chinook salmon landed in Washington state...

  10. Natural phenomena hazards project for Department of Energy sites

    International Nuclear Information System (INIS)

    Coats, D.W.

    1985-01-01

    Lawrence Livermore National Laboratory (LLNL) has developed seismic and wind hazard models for the Office of Nuclear Safety (ONS), Department of Energy (DOE). The work is part of a three-phase effort aimed at establishing uniform building design criteria for seismic and wind hazards at DOE sites throughout the United States. In Phase 1, LLNL gathered information on the sites and their critical facilities, including nuclear reactors, fuel-reprocessing plants, high-level waste storage and treatment facilities, and special nuclear material facilities. In Phase 2, development of seismic and wind hazard models, was initiated. These hazard models express the annual probability that the site will experience an earthquake or wind speed greater than some specified magnitude. In the final phase, it is anticipated that the DOE will use the hazard models to establish uniform criteria for the design and evaluation of critical facilities. 13 references, 2 figures, 1 table

  11. Work-based learning experiences help students with disabilities transition to careers: a case study of University of Washington projects.

    Science.gov (United States)

    Bellman, Scott; Burgstahler, Sheryl; Ladner, Richard

    2014-01-01

    This case study describes evidence-based practices employed by a collection of University of Washington projects that engage high school and postsecondary students with disabilities in work-based learning experiences such as industry and research internships, career development activities, job shadows, field trips, and mock interviews. The purpose of the article is two-fold. First, authors share best practices with others who wish to increase the participation of students with disabilities in work-based learning and thereby contribute to their academic and career success. The article discusses methods used to recruit students, employers and mentors, match students with specific opportunities, and prepare students for success. Second, authors share outcomes from studies regarding participation in these work-based learning opportunities, which include increased employment success, motivation to work toward a career, knowledge about careers and the workplace, job-related skills, ability to work with supervisors and coworkers, skills in self-advocating for accommodations, and perceived career options.

  12. Department

    African Journals Online (AJOL)

    USER

    2016-09-20

    Sep 20, 2016 ... Department of Biological and Environmental Sciences, Kibabii University. Abstract. This study ... Key Words: Climate Change, Regional Circulation Model, PRECIS, Bungoma County ... by different computer models is much.

  13. Framework for monitoring the social and economic impacts associated with the construction of the Skagit Nuclear Project in Skagit County, Washington

    International Nuclear Information System (INIS)

    Merwin, D.J.; Greene, M.

    1977-01-01

    The paper discusses an information system which has been developed to monitor the social and economic impacts associated with the construction of twin nuclear reactors in Skagit County, Washington, by Puget Sound Power and Light Company. The monitoring system has been specifically designed to track the social and economic impacts of the Skagit Nuclear Project as they occur

  14. 76 FR 2949 - Notice of Final Federal Agency Actions on Proposed Project in Washington

    Science.gov (United States)

    2011-01-18

    ... constructing pontoons sufficient to replace the existing traffic capacity of the Evergreen Point Bridge, in the...: Clean Air Act, as amended [42 U.S.C. 7401-7671(q)]. 3. Land: Section 4(f) of the Department of... Conservation and Management Act of 1976, as amended [16 U.S.C. 1801 et seq.]. 5. Historic and Cultural...

  15. 76 FR 55157 - Final Public Meeting in Washington, DC for the Proposed Keystone XL Project

    Science.gov (United States)

    2011-09-06

    ..., including environmental, economic, energy security, foreign policy, and pipeline safety concerns. No... and analysis of the national interest, on August 26, 2011 the U.S. Department of State announced..., Bureau of Oceans and International Environmental and Scientific Affairs/Office of Environmental Policy, U...

  16. Final Report for the ADMX Phase 2a Project at the University of Washington

    International Nuclear Information System (INIS)

    Rosenberg, Leslie J.

    2015-01-01

    This is a final report of the ADMX (Axion Dark Matter eXperiment) Phase 2a program. This program is a project allowing for a sensitive axion dark-matter search at higher axion masses. The Phase 2a program also prepares the project for lower temperature anticipated in later operations. The Phase 2a program includes sensitive data-taking operations at two cavity modes, TM010 and TM020, allowing for faster data-taking operations and extending the search to higher and plausible dark-matter axion masses.

  17. Oregon department of transportation small business group twice-monthly payments pilot project : summary report.

    Science.gov (United States)

    2008-07-01

    Oregon Department of Transportation (ODOT) recently completed a pilot study on small business payment practices. In the study, three pilot projects were tested where payments to small business contractors were changed from a monthly payment to twice-...

  18. Archaeological Investigations at Sites 45-OK-287 and 45-OK-288, Chief Joseph Dam Project, Washington.

    Science.gov (United States)

    1984-01-01

    cells dis- closed six prehistoric components contained in overbank, colluvial and aeoi ian deposits. The first occupation, dated prior to 4800 B.P...location, colluvial and aeoi Ian deposition have been relatively more Important at the site than at many other * project sites. The sites are at the...varying contib’itlons of colluvium, slopewash, and aeoi Ian sedimensts (Tables 2-3 and 2-4). All of the * cultural zones are associated with deposits above

  19. BPA/Puget Power Northwest Washington Transmission Project. Supplemental Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1995-04-01

    Bonneville Power Administration and Puget Sound Power ampersand Light Company propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit County area between the towns of Custer and Sedro Woolley, including within the City of Bellingham, starting in 1995. The upgrades of the interconnected 230-kV and 115-kV systems are needed to increase the import capacity on a nearby U.S.-Canada 500-kV intertie by about 850 megawatts (MW). BPA and Puget Power would share the increase in north-south transfer capability. An existing BPA 230-kV single-circuit, wood-pole H-frame transmission line would be upgraded to a 230-kV lattice-steel double-circuit line. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993. New 1994 studies showed that other improvements to Puget Power's system, and the addition of local generation has lessened local reliability problems. Also in 1994, BPA reevaluated all existing projects with this goal in mind. BPA and Puget determined that benefits would still result from this project, and that additional transfer capacity and improved system integrity warrant the expenditures. Given the changes in need, BPA decided to issue a Supplemental DEIS, and provide a second public review-and-comment period. The proposed action is designated Option 1. Impacts would be low to moderate and localized. Effects on soils and water resources in sensitive areas would be low to moderate; there would be little increase in magnetic fields, noise levels would approximate existing levels; and land use and property value impacts would be low. Threatened and endangered species would not be adversely affected, and all proposed Sections in wetlands would be covered by Nationwide Permit. Visual and socioeconomic impacts would be low to moderate. No cultural resources listed on the National Register of Historic Places would be affected

  20. Kodak Skills Enhancement Program. U.S. Department of Education National Workplace Literacy Project. Final Report.

    Science.gov (United States)

    Beaudin, Bart P.

    The Kodak Skills Enhancement program was a workplace literacy project funded through the U.S. Department of Education's National Workplace Literacy Program. The project goals were as follows: (1) establish a positive climate within the Kodak corporate environment to ensure program effectiveness by garnering support at all levels; (2) determine the…

  1. EC4IT - A Guide to European Commission Projects for CERN/IT department

    CERN Document Server

    Jones, R

    2012-01-01

    European Commission (EC) projects represent an important source of external funding for a number of activities in which IT department is involved. The EC has a set of procedures and formalities for the preparation, negotiation, execution and completion of projects that are different to those normally used at CERN. This document gives an overview of the administrative, financial, reporting and managerial steps involved in participating in an EC project.

  2. BPA/Puget Power Northwest Washington Transmission Project Final Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-08-01

    Bonneville Power Administration (BPA) and Puget Sound Power & Light Company (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit counties area between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993, followed by a 45-day public comment period. Public response to the DEIS included the identification of several new transmission route alternatives in the Lake Whatcom area. BPA issued a Supplemental DEIS in April 1995 to provide a second public review-and-comment period. Rebuilding an existing 230-kV line to a double-circuit 230-kV transmission line was identified in the Supplemental DEIS as the Proposed Action. The Supplemental DEIS also examined in detail a North Shore Road alternative which was proposed by some members of the public. Public comments on the EIS were listed and responded to in the Supplemental DEIS. In May 1995, a second set of open houses and public meetings was held to review the Supplemental DEIS. Electromagnetic field (EMF) effects raised as an issue in the DEIS continued to be an issue of public concern in the meetings. The EIS has identified impacts that would generally be classified as low to moderate and localized. Effects on soils and water resources in sensitive areas (e.g., near Lake Whatcom) would be low to moderate; there would be little change in magnetic fields; noise levels would remain at existing levels; and land use and property value impacts would be minimal. Threatened and endangered species would not be adversely affected, and all proposed actions in wetlands would be covered by a Corps of Engineers Nationwide Permit. Visual and socioeconomic would be low to moderate. There would be no effect on cultural resources.

  3. U.S. Department of Energy Uranium Mill Tailings Remedial Action Ground Water Project: Project plan

    International Nuclear Information System (INIS)

    1994-09-01

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA Project processing sites. The compliance strategy for the processing sites must satisfy the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1987). This scope of work will entail the following activities on a site-specific basis: Develop a compliance strategy based on modification of the UMTRA Surface Project RAPs or develop Ground Water Project RAPs with NRC concurrence on the RAP and full participation of the affected states and tribes. Implement the RAP to include institutional controls, where appropriate, as an interim measure until compliance with the standards is achieved. Institute long-term verification monitoring for transfer to a separate long-term surveillance program on or before the Project end date. Prepare certification or confirmation reports and modify the long-term surveillance plan (LTSP), where needed, on those sites completed prior to the Project end date

  4. Current meter data from moored current meter casts in the Coastal Waters of Washington/Oregon as part of the Land-Margin Ecosystem Research (LEML) project, 06 May 1997 - 19 October 1997 (NODC Accession 9800193)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Current meter data were collected using moored current meter casts in the Coastal Waters of Washington/Oregon from May 6, 1997 to October 19, 1997. Data were...

  5. Physical data from CTD casts in the North Pacific Ocean from the THOMAS G. THOMPSON and the THOMAS WASHINGTON in support of the Marathon 2 Project from 05 May 1985 to 07 September 1987 (NODC Accession 9400131)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Temperature and salinity profiles were collected from CTD casts in the North Pacific Ocean from the THOMAS G. THOMPSON and the THOMAS WASHINGTON. Data were collected...

  6. Statement of John H. Anttonen, Project Manager, Basalt Waste Isolation Project, Richland Operations Office, Department of Energy

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    My name is John Anttonen and I am the Project Manager for the Basalt Waste Isolation Project (BWIP) at the Department of Energy Richland Operation Office. The responsibilities of may office are to manage the day-to-day activities of the site suitability investigations of the basalt formations at the Hanford Site, a Department complex that is involved in a variety of national missions, including defense materials production, nuclear energy research, and radioactive waste management. In may prepared comments today I would like to touch upon four specific subject areas relating to the BWIP program and then I would be happy to answer any questions you might have. The topics I will cover are: (1) historical aspects; (2) site specific technical issues and how they will be addressed during site characterization of the basalt site at Hanford; (3) current project status and; (4) institutional interaction. For clarity, I have attached several charts to my statement

  7. Albeni Falls Wildlife Mitigation Project; Idaho Department of Fish and Game 2007 Final Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Cousins, Katherine [Idaho Department of Fsh and Game

    2009-04-03

    The Idaho Department of Fish and Game maintained a total of about 2,743 acres of wildlife mitigation habitat in 2007, and protected another 921 acres. The total wildlife habitat mitigation debt has been reduced by approximately two percent (598.22 HU) through the Department's mitigation activities in 2007. Implementation of the vegetative monitoring and evaluation program continued across protected lands. For the next funding cycle, the IDFG is considering a package of restoration projects and habitat improvements, conservation easements, and land acquisitions in the project area.

  8. Assessing fish predation on migrating juvenile steelhead and a retrospective comparison to steelhead survival through the Priest Rapids Hydroelectric Project, Columbia River, Washington, 2009-11

    Science.gov (United States)

    Hardiman, Jill M.; Counihan, Timothy D.; Burgess, Dave S.; Simmons, Katrina E.; Holmberg, Glen S.; Rogala, Josh; Polacek, Rochelle

    2012-01-01

    The U.S. Geological Survey (USGS) and the Washington Department of Fish and Wildlife (WDFW) have been working with the Public Utility District No. 2 of Grant County, Washington (Grant PUD), to increase their understanding of predator-prey interactions in the Priest Rapids Hydroelectric Project (PRP), Columbia River, Washington. For this study, the PRP is defined as the area approximately 6 kilometers upstream of Wanapum Dam to the Priest Rapids Dam tailrace, 397.1 miles from the mouth of the Columbia River. Past year’s low survival numbers of juvenile steelhead (Oncorhynchus mykiss) through Wanapum and Priest Rapids Dams has prompted Grant PUD, on behalf of the Priest Rapids Coordinating Committee, to focus research efforts on steelhead migration and potential causal mechanisms for low survival. Steelhead passage survival in 2009 was estimated at 0.944 through the Wanapum Development (dam and reservoir) and 0.881 through the Priest Rapids Development and for 2010, steelhead survival was 0.855 for Wanapum Development and 0.904 for Priest Rapids Development. The USGS and WDFW implemented field collection efforts in 2011 for northern pikeminnow (Ptychocheilus oregonensis), smallmouth bass (Micropterus dolomieu), and walleye (Sander vitreus, formerly Stizostedion vitreum) and their diets in the PRP. For predator indexing, we collected 948 northern pikeminnow, 237 smallmouth bass, 18 walleye, and two largemouth bass (Micropterus salmoides). The intent of this study was to provide standardized predation indices within individual reaches of the PRP to discern spatial variability in predation patterns. Furthermore, the results of the 2011 study were compared to results of a concurrent steelhead survival study. Our results do not indicate excessively high predation of Oncorhynchus spp. occurring by northern pikeminnow or smallmouth bass in any particular reach throughout the study area. Although we found Oncorhynchus spp. in the predator diets, the relative

  9. A Conceptual Framework for Adaptive Project Management in the Department of Defense

    Science.gov (United States)

    2016-04-30

    qÜáêíÉÉåíÜ=^ååì~ä= ^Åèìáëáíáçå=oÉëÉ~êÅÜ= póãéçëáìã= qÜìêëÇ~ó=pÉëëáçåë= sçäìãÉ=ff= = A Conceptual Framework for Adaptive Project Management in the Department... Conceptual Framework for Adaptive Project Management in the Department of Defense Martin Brown, Jr., Project Manager, Program Executive Office for...NPS ^Åèìáëáíáçå=oÉëÉ~êÅÜ=mêçÖê~ãW= `êÉ~íáåÖ=póåÉêÖó=Ñçê=fåÑçêãÉÇ=`Ü~åÖÉ= - 503 - A Conceptual Framework for Adaptive Project Management in

  10. 75 FR 52023 - Notice of Inventory Completion: Thomas Burke Memorial Washington State Museum, University of...

    Science.gov (United States)

    2010-08-24

    ... DEPARTMENT OF THE INTERIOR National Park Service Notice of Inventory Completion: Thomas Burke Memorial Washington State Museum, University of Washington, Seattle, WA AGENCY: National Park Service... of the Thomas Burke Memorial Washington State Museum (Burke Museum), University of Washington...

  11. 75 FR 36672 - Notice of Inventory Completion: Thomas Burke Memorial Washington State Museum, University of...

    Science.gov (United States)

    2010-06-28

    ... DEPARTMENT OF THE INTERIOR National Park Service Notice of Inventory Completion: Thomas Burke Memorial Washington State Museum, University of Washington, Seattle, WA AGENCY: National Park Service... of the Thomas Burke Memorial Washington State Museum (Burke Museum), University of Washington...

  12. Washington Conference

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    The 1981 Particle Accelerator Conference was held in Washington from 11-13 March. It was the ninth in the series of meetings organized in the USA which differ from the 'International' meetings in their coverage of the full range of accelerator engineering and technology, including applications outside e field of high energy physics. The Conference took place under the cloud of further budget cuts for Fiscal Year 1982 in the USA which the Department of Energy has applied in line with the financial policy of the new administration. Coming on top of many years of budget trimming which have reduced the number of high energy physics Laboratories funded by the DOE to three (Brookhaven, Fermilab, Stanford - Cornell is funded by the National Science Foundation) and reduced the exploitation of these Laboratories to less than half of their potential, the new cuts did not exactly help to boost morale. Nevertheless, the huge amount of tailed work in accelerator physics and technology which was presented at the Conference showed how alive the field is

  13. Monitoring streams and stormwater ponds for early detection of oomycete plant pathogens in western Washington, a citizen science project

    Science.gov (United States)

    Marianne Elliott; Lucy Rollins; Gary Chastagner

    2017-01-01

    Sudden Oak Death (SOD) is the common name for a disease caused by Phytophthora ramorum (oomycetes), an invasive plant pathogen of regulatory concern. The nursery, timber, forest specialty product, and Christmas tree industries in Washington are at risk because of the spread of P. ramorum within nurseries and from nurseries into...

  14. Projections of timber harvest in western Oregon and Washington by county, owner, forest type, and age class.

    Science.gov (United States)

    Xiaoping Zhou; Richard W. Haynes; R. James. Barbour

    2005-01-01

    The Pacific Northwest forest resource is highly dynamic. Expected changes over the next 50 years will greatly challenge some current perceptions of resource managers and various stakeholders. This report describes the current and expected future timberland conditions of western Oregon and Washington and presents the results at the county level. About 50 percent of the...

  15. Regeneration in United States Department of Agriculture Forest Service mixed conifer partial cuttings in the Blue Mountains of Oregon and Washington.

    Science.gov (United States)

    K.W. Seidel; S. Conrade. Head

    1983-01-01

    A survey in the Blue Mountains of north-eastern Oregon and southeastern Washington showed that, on the average, partial cuts in the grand fir/big huckleberry community were well stocked with a mixture of advance, natural post-harvest, and planted reproduction of a number of species. Partial cuts in the mixed conifer/pinegrass community had considerably fewer seedlings...

  16. Current status of the tasks performed by the Nuclear Fuel Department for the CAREM project

    International Nuclear Information System (INIS)

    Kaufmann, Federico; Perez, Lidia E.; Perez, Aaldo; Marchi, Daniel E.

    2009-01-01

    CAREM Project required to the Nuclear Fuels Department to perform the necessary tasks to define the powder characteristics and natural UO 2 -Gd 2 O 3 , UO 2 -1.8 and 3.1 % enrichment fuel pellets manufacturing and control parameters. To start with these tasks it was necessary to hire and train staff, begin the licensing process of the facilities, update infrastructure works and equipment of existing facilities. A brief description of the tasks performed is shown. (author)

  17. Report on materials characterization center workshop on stress corrosion cracking for the Salt Repository Project, December 16-17, 1986, Seattle, Washington: Workshop summary

    International Nuclear Information System (INIS)

    Merz, M.D.; Shannon, D.W.

    1986-09-01

    The Materials Characterization Center (MCC) at Pacific Northwest Laboratory (PNL) conducted a Workshop on Stress Corrosion Cracking for the Salt Repository Project on December 16 and 17, 1986 in Seattle, Washington. The workshop was held to formulate recommendations for addressing stress corrosion cracking (SCC) in a salt repository. It was attended by 24 representatives from major laboratories, universities, and industry. This report presents the recommendations of the workshop, along with the agenda, list of participants, questions and comments, summaries of working groups on low-strength steel and alternate materials, and materials handed out by the speakers

  18. A Pilot Project Demonstrating that Combat Medics Can Safely Administer Parenteral Medications in the Emergency Department.

    Science.gov (United States)

    Schauer, Steven G; Cunningham, Cord W; Fisher, Andrew D; DeLorenzo, Robert A

    2017-12-01

    Introduction Select units in the military have improved combat medic training by integrating their functions into routine clinical care activities with measurable improvements in battlefield care. This level of integration is currently limited to special operations units. It is unknown if regular Army units and combat medics can emulate these successes. The goal of this project was to determine whether US Army combat medics can be integrated into routine emergency department (ED) clinical care, specifically medication administration. Project Design This was a quality assurance project that monitored training of combat medics to administer parenteral medications and to ensure patient safety. Combat medics were provided training that included direct supervision during medication administration. Once proficiency was demonstrated, combat medics would prepare the medications under direct supervision, followed by indirect supervision during administration. As part of the quality assurance and safety processes, combat medics were required to document all medication administrations, supervising provider, and unexpected adverse events. Additional quality assurance follow-up occurred via complete chart review by the project lead. Data During the project period, the combat medics administered the following medications: ketamine (n=13), morphine (n=8), ketorolac (n=7), fentanyl (n=5), ondansetron (n=4), and other (n=6). No adverse events or patient safety events were reported by the combat medics or discovered during the quality assurance process. In this limited case series, combat medics safely administered parenteral medications under indirect provider supervision. Future research is needed to further develop this training model for both the military and civilian setting. Schauer SG , Cunningham C W, Fisher AD , DeLorenzo RA . A pilot project demonstrating that combat medics can safely administer parenteral medications in the emergency department. Prehosp Disaster Med. 2017;32(6):679-681.

  19. Prioritization of proposed waste management construction projects for the Waste Management program within the Department of Energy

    International Nuclear Information System (INIS)

    Johnson, J.V.

    1995-01-01

    A prioritization process is used to evaluate and rank proposed construction projects within the Department of Energy's Waste Management program. The process is used to determine which projects should proceed with conceptual design activities. The proposed construction projects are evaluated against a set of criteria which reflect Waste Management priorities. A management review team ranks and scores the projects thereby generating a prioritized list of projects. Despite decreasing budgets and changing political climates, the process has been a successful decision-aiding tool for selecting construction projects to carry out the Waste Management mission within the Department of Energy

  20. Department of Energy review of the National Spallation Neutron Source Project

    International Nuclear Information System (INIS)

    1997-06-01

    A Department of Energy (DOE) review of the Conceptual Design Report (CDR) for the National Spallation Neutron Source (NSNS) was conducted. The NSNS will be a new high-power spallation neutron source; initially, it will operate at 1 megawatt (MW), but is designed to be upgradeable to significantly higher power, at lower cost, when accelerator and target technologies are developed for higher power. The 53-member Review Committee examined the projected cost, schedule, technical scope, and management structure described in the CDR. For each of the major components of the NSNS, the Committee determined that the project team had produced credible designs that can be expected to work well. What remains to be done is to integrate the design of these components. With the exception of the liquid mercury target, the NSNS Project will rely heavily on proven technologies and, thus, will face a relatively low risk to successful project completion. The Total Project Cost (TPC) presented to the Committee in the CDR was $1.266 billion in as-spent dollars. In general, the Committee felt that the laboratory consortium had presented a credible estimate for each of the major components but that value engineering might produce some savings. The construction schedule presented to the Committee covered six years beginning in FY 1999. The Committee questioned whether all parts of the project could be completed according to this schedule. In particular, the linac and the conventional facilities appeared to have overly optimistic schedules. The NSNS project team was encouraged to reexamine these activities and to consider a more conservative seven-year schedule. Another concern of the Committee was the management structure. In summary, the Committee felt that this Conceptual Design Report was a very credible proposal, and that there is a high probability for successful completion of this major project within the proposed budget, although the six-year proposed schedule may be optimistic

  1. Department of Energy review of the National Spallation Neutron Source Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    A Department of Energy (DOE) review of the Conceptual Design Report (CDR) for the National Spallation Neutron Source (NSNS) was conducted. The NSNS will be a new high-power spallation neutron source; initially, it will operate at 1 megawatt (MW), but is designed to be upgradeable to significantly higher power, at lower cost, when accelerator and target technologies are developed for higher power. The 53-member Review Committee examined the projected cost, schedule, technical scope, and management structure described in the CDR. For each of the major components of the NSNS, the Committee determined that the project team had produced credible designs that can be expected to work well. What remains to be done is to integrate the design of these components. With the exception of the liquid mercury target, the NSNS Project will rely heavily on proven technologies and, thus, will face a relatively low risk to successful project completion. The Total Project Cost (TPC) presented to the Committee in the CDR was $1.266 billion in as-spent dollars. In general, the Committee felt that the laboratory consortium had presented a credible estimate for each of the major components but that value engineering might produce some savings. The construction schedule presented to the Committee covered six years beginning in FY 1999. The Committee questioned whether all parts of the project could be completed according to this schedule. In particular, the linac and the conventional facilities appeared to have overly optimistic schedules. The NSNS project team was encouraged to reexamine these activities and to consider a more conservative seven-year schedule. Another concern of the Committee was the management structure. In summary, the Committee felt that this Conceptual Design Report was a very credible proposal, and that there is a high probability for successful completion of this major project within the proposed budget, although the six-year proposed schedule may be optimistic.

  2. Friday Harbor Marina Expansion Study--San Juan Island, Washington: Final Detailed Project Report and Environmental Assessment.

    Science.gov (United States)

    1981-04-01

    1) nor at any other land or water site in the area. The existing wood enclosed plastic flo- tation chambered breakwater would continue to deteriorate...large bates of absorbent chips on hand to deal with minor oil spills. We have ordered from Crowley Environmental Services, Seattle, Washington 100 3M TY...Oll ’ ih ICbI of 811) , ,* (&) Power or natural #;41%4 the ibuve ifllomiiuci is true snd1. Luniple:it Is i U.6~ I. ( i.iilu hat~ ihr lca . a&icn.y mai~y

  3. The ''Ulisse'' project for the treatment of radioactive wastes of ENEA Department of Fuel

    International Nuclear Information System (INIS)

    Broglia, M.

    1988-01-01

    The high-level liquid wastes producedby the Nuclear Fuel Cycle Department of the Italian Committee for R and D of Nuclear and Alternative Energy since 1970 up today, are characterized by a very high aluminum content which would seriously limit the option of their vitrification. A simple chemical process for the separation of the radioactive fraction from the aluminum nitrate solution before vitrification has been proposed, reducing by a factor 10 the finally obtainable glass-waste volume (the ''ULISSE'' Project). This comparative study of the ''ULISSE'' high-level waste and detailed compositions of preferred products from various international Laboratories should supply a good initial condition in a glass matrix design for waste immobilization, and a feed-back control on the Project parameters

  4. A continuous quality improvement project to reduce medication error in the emergency department.

    Science.gov (United States)

    Lee, Sara Bc; Lee, Larry Ly; Yeung, Richard Sd; Chan, Jimmy Ts

    2013-01-01

    Medication errors are a common source of adverse healthcare incidents particularly in the emergency department (ED) that has a number of factors that make it prone to medication errors. This project aims to reduce medication errors and improve the health and economic outcomes of clinical care in Hong Kong ED. In 2009, a task group was formed to identify problems that potentially endanger medication safety and developed strategies to eliminate these problems. Responsible officers were assigned to look after seven error-prone areas. Strategies were proposed, discussed, endorsed and promulgated to eliminate the problems identified. A reduction of medication incidents (MI) from 16 to 6 was achieved before and after the improvement work. This project successfully established a concrete organizational structure to safeguard error-prone areas of medication safety in a sustainable manner.

  5. Washington: a guide to geothermal energy development

    Energy Technology Data Exchange (ETDEWEB)

    Bloomquist, R.G.; Basescu, N.; Higbee, C.; Justus, D.; Simpson, S.

    1980-06-01

    Washington's geothermal potential is discussed. The following topics are covered: exploration, drilling, utilization, legal and institutional setting, and economic factors of direct use projects. (MHR)

  6. Project plans for transuranic waste at small quantity sites in the Department of Energy comples-10522

    International Nuclear Information System (INIS)

    Mctaggart, Jerri Lynne; Lott, Sheila; Gadbury, Casey

    2009-01-01

    Los Alamos National Laboratory, Carlsbad Office (LANL-CO), has been tasked to write Project Plans for all of the Small Quantity Sites (SQS) with defense related Transuranic (TRU) waste in the Department of Energy (DOE) complex. Transuranic Work-Off Plans were precursors to the Project Plans. LANL-CO prepared a Work-Off Plan for each small quantity site. The Work-Off Plan that identified issues, drivers, schedules, and inventory. Eight sites have been chosen to deinventory their legacy TRU waste; Bettis Atomic Power Laboratory, General Electric-Vallecitos Nuclear Center, Lawrence Berkeley National Laboratory, Lawrence Livermore National Laboratory-Area 300, Nevada Test Site, Nuclear Radiation Development, Sandia National Laboratory, and the Separations Process Research Unit. Each plan was written for contact and/or remote handled waste if present at the site. These project plans will assist the small quantity sites to ship legacy TRU waste offsite and de-inventory the site of legacy TRU waste. The DOE is working very diligently to reduce the nuclear foot print in the United States. Each of the eight SQSs will be de-inventoried of legacy TRU waste during a campaign that ends September 2011. The small quantity sites have a fraction of the waste that large quantity sites possess. During this campaign, the small quantity sites will package all of the legacy TRU waste and ship to Idaho or directly to the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico. The sites will then be removed from the Transuranic Waste Inventory if they are de-inventoried of all waste. Each Project Plan includes the respective site inventory report, schedules, resources, drivers and any issues. These project plans have been written by the difficult waste team and will be approved by each site. Team members have been assigned to each site to write site specific project plans. Once the project plans have been written, the difficult team members will visit the sites to ensure nothing has

  7. Washington Public Power Supply System Nuclear Projects 3 and 5 (Docket Nos. STN 50-508 and 50-509): Final environmental statement

    International Nuclear Information System (INIS)

    1975-06-01

    The proposed action is the issuance of construction permits to the Washington Public Power Supply System for the construction of the Washington Nuclear Projects 3 and 5 (WNP 3 and 5). The 2170-acre site is predominately forest. Construction-related activities on the site would disturb about 300 acres. The portion of this land not to be used for the plant facilities, parking lots, roads, etc., will be restored by seeding and landscaping. The temporary removal of vegetation will tend to promote erosion. Increased siltation and turbidity can be expected in local rivers and streams during construction, but stringent measures will be undertaken to minimize these effects. A maximum of 72.5 cfs of cooling water will be withdrawn from the Chehalis River of which 12.5 cfs will be returned to the river via pipeline with the dissolved solids concentration increased by a factor of about 6. About 60 cfs will be evaporated to the atmosphere by the cooling towers. Minor and temporary impacts to the biota of the river and its south bank will result from construction activities. The volume of thermal discharge (12.5 cfs) is small compared with the river flow (annual mean is about 6600 cfs) and the effect on the river ecosystem is not expected to be significant. Chemical discharges from the plant, including chlorine, will be diluted to concentrations below those which might adversely affect aquatic biota. The risk associated with accidental radiation exposure will be very low. 37 figs., 58 tabs

  8. CTD cast and zooplankton count data collected in Dabob Bay, Hood Canal, Puget Sound, Washington during twenty-six cruises aboard the CLIFFORD A. BARNES, February 2002 - April 2004 (NODC Accession 0014832)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This dataset contains CTD cast and zooplankton data collected during twenty-six cruises to Dabob Bay, Washington in 2002 - 2004 for the project entitled "Copepod -...

  9. United States Department of Energy projects related to reactor pressure vessel annealing optimization

    International Nuclear Information System (INIS)

    Rosinski, S.T.; Nakos, J.T.

    1993-01-01

    Light water reactor pressure vessel (RPV) material properties reduced by long-term exposure to neutron irradiation can be recovered through a thermal annealing treatment. This technique to extend RPV life, discussed in this report, provides a complementary approach to analytical methodologies to evaluate RPV integrity. RPV annealing has been successfully demonstrated in the former Soviet Union and on a limited basis by the US (military applications only). The process of demonstrating the technical feasibility of annealing commercial US RPVs is being pursued through a cooperative effort between the nuclear industry and the US Department of Energy (USDOE) Plant Lifetime Improvement (PLIM) Program. Presently, two projects are under way through the USDOE PLIM Program to demonstrate the technical feasibility of annealing commercial US RPVS, (1) annealing re-embrittlement data base development and (2) heat transfer boundary condition experiments

  10. Statement of J.O. Neff, Manager, Salt Repository Project Office, Department of Energy

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    My name is Jeff Neff and I am the Manager of the US Department of Energy's Salt Repository Project Office, now located in Hereford, Texas. The responsibilities of my office are to manage the day-to-day activities of the site suitability investigations of the designated nine-square-mile site located in Deaf Smith County, near Hereford in the Texas Panhandle. The location is indicated on several of the attachments. My remarks will be divided into five categories: (1) a brief history of how the Deaf Smith County site was designated; (2) a review of major issues for the Texas site and how these are expected to be resolved during site characterization; (3) a summary of major institutional issues; (4) a summary of consultation and cooperation activities with the State of Texas, through its Nuclear Waste Programs Office; and (5) highlights of current and past interactions with local governmental officials and the public in the Panhandle

  11. 2002 NASA/USGS Airborne LiDAR Assessment of Coastal Erosion (ALACE) Project for California, Oregon, and Washington Coastlines

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Laser beach mapping uses a pulsed laser ranging system mounted onboard an aircraft to measure ground elevation and coastal topography. The laser emits laser beams at...

  12. US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36 was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  13. Using Medical Student Quality Improvement Projects to Promote Evidence-Based Care in the Emergency Department

    Directory of Open Access Journals (Sweden)

    Michael W. Manning

    2017-12-01

    Full Text Available Introduction The Association of American Medical Colleges’ (AAMC initiative for Core Entrustable Professional Activities for Entering Residency includes as an element of Entrustable Professional Activity 13 to “identify system failures and contribute to a culture of safety and improvement.” We set out to determine the feasibility of using medical students’ action learning projects (ALPs to expedite implementation of evidence-based pathways for three common patient diagnoses in the emergency department (ED setting (Atrial fibrillation, congestive heart failure, and pulmonary embolism. Methods These prospective quality improvement (QI initiatives were performed over six months in three Northeastern PA hospitals. Emergency physician mentors were recruited to facilitate a QI experience for third-year medical students for each project. Six students were assigned to each mentor and given class time and network infrastructure support (information technology, consultant experts in lean management to work on their projects. Students had access to background network data that revealed potential for improvement in disposition (home for patients. Results Under the leadership of their mentors, students accomplished standard QI processes such as performing the background literature search and assessing key stakeholders’ positions that were involved in the respective patient’s care. Students effectively developed flow diagrams, computer aids for clinicians and educational programs, and participated in recruiting champions for the new practice standard. They met with other departmental clinicians to determine barriers to implementation and used this feedback to help set specific parameters to make clinicians more comfortable with the changes in practice that were recommended. All three clinical practice guidelines were initiated at consummation of the students’ projects. After implementation, 86% (38/44 of queried ED providers felt comfortable

  14. Using Medical Student Quality Improvement Projects to Promote Evidence-Based Care in the Emergency Department.

    Science.gov (United States)

    Manning, Michael W; Bean, Eric W; Miller, Andrew C; Templer, Suzanne J; Mackenzie, Richard S; Richardson, David M; Bresnan, Kristin A; Greenberg, Marna R

    2018-01-01

    The Association of American Medical Colleges' (AAMC) initiative for Core Entrustable Professional Activities for Entering Residency includes as an element of Entrustable Professional Activity 13 to "identify system failures and contribute to a culture of safety and improvement." We set out to determine the feasibility of using medical students' action learning projects (ALPs) to expedite implementation of evidence-based pathways for three common patient diagnoses in the emergency department (ED) setting (Atrial fibrillation, congestive heart failure, and pulmonary embolism). These prospective quality improvement (QI) initiatives were performed over six months in three Northeastern PA hospitals. Emergency physician mentors were recruited to facilitate a QI experience for third-year medical students for each project. Six students were assigned to each mentor and given class time and network infrastructure support (information technology, consultant experts in lean management) to work on their projects. Students had access to background network data that revealed potential for improvement in disposition (home) for patients. Under the leadership of their mentors, students accomplished standard QI processes such as performing the background literature search and assessing key stakeholders' positions that were involved in the respective patient's care. Students effectively developed flow diagrams, computer aids for clinicians and educational programs, and participated in recruiting champions for the new practice standard. They met with other departmental clinicians to determine barriers to implementation and used this feedback to help set specific parameters to make clinicians more comfortable with the changes in practice that were recommended. All three clinical practice guidelines were initiated at consummation of the students' projects. After implementation, 86% (38/44) of queried ED providers felt comfortable with medical students being a part of future ED QI

  15. BWIP [Battelle Waste Isolation Program] Repository Project: Interim fiscal profile, Benton and Franklin counties, Washington: Working draft

    International Nuclear Information System (INIS)

    Dong, F.B.; Dugan, M.K.; Clark, D.C.

    1988-02-01

    This report presents a fiscal profile of Benton and Franklin counties, and of the cities of Richland, Kennewick, and Pasco. Overall, changes in operating revenues and expenditures in these jurisdictions have corresponded with changes in the local economy. The combined operating expenditures of Benton County, Franklin County, Kennewick, Pasco, and Richland, expressed in current dollars, tripled between 1975 and 1985, increasing from $18.1 million to $55.0 million, an annual average increase of 11.8 percent. During this time, the population of the Benton-Franklin MSA increased from 100,000 to 140,900 people, and the national all-items price index for urban consumers doubled, increasing from 161.2 to 322.2. Adjusted for inflation, per capita expenditures by these governments increased only slightly during this period, from $361.8 in 1975 to $390.3 in 1985. Employment in the Benton-Franklin MSA rose from 40,080 workers in 1970 to a peak of 75,900 in 1981 before declining to 61,100 in 1985, primarily due to the loss of 9,928 jobs in the Washington Public Power Supply System after 1981. The MSA's population followed a similar trend, with a slight lag. In 1970, total population in the Benton-Franklin MSA was 93,356 people. The MSA's population grew rapidly during the late 1970s, reached a peak of 147,900 persons in 1982, and then declined to 139,300 in 1986. 23 refs., 16 figs., 14 tabs

  16. Emergency department evaluation of ischemic stroke and TIA: the BASIC Project.

    Science.gov (United States)

    Brown, D L; Lisabeth, L D; Garcia, N M; Smith, M A; Morgenstern, L B

    2004-12-28

    To identify demographic and clinical variables of emergency department (ED) practices in a community-based acute stroke study. By both active and passive surveillance, the authors identified cerebrovascular disease cases in Nueces County, TX, as part of the Brain Attack Surveillance in Corpus Christi (BASIC) Project, a population-based stroke surveillance study, between January 1, 2000, and December 31, 2002. With use of multivariable logistic regression, variables independently associated with three separate outcomes were sought: hospital admission, brain imaging in the ED, and neurologist consultation in the ED. Prespecified variables included age, sex, ethnicity, insurance status, NIH Stroke Scale score, type of stroke (ischemic stroke or TIA), vascular risk factors, and symptom presentation variables. Percentage use of recombinant tissue plasminogen activator (rt-PA) was calculated. A total of 941 Mexican Americans (MAs) and 855 non-Hispanic whites (NHWs) were seen for ischemic stroke (66%) or TIA (34%). Only 8% of patients received an in-person neurology consultation in the ED, and 12% did not receive any head imaging. TIA was negatively associated with neurology consultations compared with completed stroke (odds ratio [OR] 0.35 [95% CI 0.21 to 0.57]). TIA (OR 0.14 [0.10 to 0.19]) and sensory symptoms (OR 0.59 [0.44 to 0.81]) were also negatively associated with hospital admission. MAs (OR 0.58 [0.35 to 0.98]) were less likely to have neurology consultations in the ED than NHWs. Only 1.7% of patients were treated with rt-PA. Neurologists are seldom involved with acute cerebrovascular care in the emergency department (ED), especially in patients with TIA. Greater neurologist involvement may improve acute stroke diagnosis and treatment efforts in the ED.

  17. An assessment of interstate safety investment properties in Washington state.

    Science.gov (United States)

    2014-12-01

    The Washington State Department of Transportation (WSDOT) commissioned the current study, targeting the entire interstate : mainline network in Washington State, to provide strategic direction to multi-biennial investment interstate locations that of...

  18. Safety evaluation report related to the operation of WPPSS Nuclear Project No. 2, Docket No. 50-397, Washington Public Power Supply System

    International Nuclear Information System (INIS)

    1982-12-01

    Supplement 2 to the Safety Evaluation Report for Washington Public Power Supply System's application for a license to operate WNP-2 (Docket No. 50-397), located in Benton County, Washington, approximately 12 miles north of Richland, Washington, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report and Supplement 1

  19. Model Diagnostics for the Department of Energy's Accelerated Climate Modeling for Energy (ACME) Project

    Science.gov (United States)

    Smith, B.

    2015-12-01

    In 2014, eight Department of Energy (DOE) national laboratories, four academic institutions, one company, and the National Centre for Atmospheric Research combined forces in a project called Accelerated Climate Modeling for Energy (ACME) with the goal to speed Earth system model development for climate and energy. Over the planned 10-year span, the project will conduct simulations and modeling on DOE's most powerful high-performance computing systems at Oak Ridge, Argonne, and Lawrence Berkeley Leadership Compute Facilities. A key component of the ACME project is the development of an interactive test bed for the advanced Earth system model. Its execution infrastructure will accelerate model development and testing cycles. The ACME Workflow Group is leading the efforts to automate labor-intensive tasks, provide intelligent support for complex tasks and reduce duplication of effort through collaboration support. As part of this new workflow environment, we have created a diagnostic, metric, and intercomparison Python framework, called UVCMetrics, to aid in the testing-to-production execution of the ACME model. The framework exploits similarities among different diagnostics to compactly support diagnosis of new models. It presently focuses on atmosphere and land but is designed to support ocean and sea ice model components as well. This framework is built on top of the existing open-source software framework known as the Ultrascale Visualization Climate Data Analysis Tools (UV-CDAT). Because of its flexible framework design, scientists and modelers now can generate thousands of possible diagnostic outputs. These diagnostics can compare model runs, compare model vs. observation, or simply verify a model is physically realistic. Additional diagnostics are easily integrated into the framework, and our users have already added several. Diagnostics can be generated, viewed, and manipulated from the UV-CDAT graphical user interface, Python command line scripts and programs

  20. Implementation of a rapid chest pain protocol in the emergency department: A quality improvement project.

    Science.gov (United States)

    Bunch, Azalea Marie; Leasure, A Renee; Carithers, Cathrin; Burnette, Robert E; Berryman, Michael Scott

    2016-02-01

    The purpose of this quality improvement (QI) project is to compare the effectiveness of a rapid 90-min chest pain screening and evaluation protocol to a 120-min screening and evaluation protocol in determining patient readiness for hospital admission or discharge home. The existing chest pain protocol utilized in the emergency department (ED) was revised based on a review of current research changing initial screening and reevaluation times from 120 to 90 min. A prospective comparative study of patients presenting to the ED with chest pain was performed comparing the existing chest pain protocol of 120 min (standard care) with a rapid screening evaluation protocol of 90 min. A total of 128 patients presenting to an ED in Texas with chest pain comprised the sample for this study. There was a significant difference in the number of minutes between the groups for readiness for disposition. The average time from chest pain evaluation to readiness for disposition home, observation, or admission decreased from an average of 191 min in the standard care group to an average of 118 min in the rapid screening group. Use of the rapid screening and evaluation protocol decreased the time to disposition by an average of 73 min, which enhanced ED flow without influencing disposition and patient safety. ©2015 American Association of Nurse Practitioners.

  1. National Centers for Environmental Prediction-Department of Energy (NCEP-DOE) Atmospheric Model Intercomparison Project (AMIP)-II Reanalysis (Reanalysis-2)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The NCEP-DOE Atmospheric Model Intercomparison Project (AMIP-II) reanalysis is a follow-on project to the "50-year" (1948-present) NCEP-NCAR Reanalysis Project....

  2. Steam Generator Tube Integrity Program: Surry Steam Generator Project, Hanford site, Richland, Benton County, Washington: Environmental assessment

    International Nuclear Information System (INIS)

    1980-03-01

    The US Nuclear Regulatory Commission (NRC) has placed a Nuclear Regulatory Research Order with the Richland Operations Office of the US Department of Energy (DOE) for expanded investigations at the DOE Pacific Northwest Laboratory (PNL) related to defective pressurized water reactor (PWR) steam generator tubing. This program, the Steam Generator Tube Integrity (SGTI) program, is sponsored by the Metallurgy and Materials Research Branch of the NRC Division of Reactor Safety Research. This research and testing program includes an additional task requiring extensive investigation of a degraded, out-of-service steam generator from a commercial nuclear power plant. This comprehensive testing program on an out-of-service generator will provide NRC with timely and valuable information related to pressurized water reactor primary system integrity and degradation with time. This report presents the environmental assessment of the removal, transport, and testing of the steam generator along with decontamination/decommissioning plans

  3. Project Execution Plan, Waste Management Division, Nevada Operations Office, U.S. Department of Energy, April 2000

    International Nuclear Information System (INIS)

    2000-01-01

    This plan addresses project activities encompassed by the U.S. Department of Energy/Nevada Operations Office Waste Management Division and conforms to the requirements contained in the ''Life Cycle Asset Management,'' U.S. Department of Energy Order O430.1A; the Joint Program Office Policy on Project Management in Support of DOE Order O430.1, and the Project Execution and Engineering Management Planning Guide. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the state of Nevada; and traditional project management philosophies such as the development of life cycle costs, schedules, and work scope; identification of roles and responsibilities; and baseline management and controls

  4. Application of Systems Engineering to U.S. Department of Energy Privatization Project Selection at the Hanford Nuclear Reservation

    International Nuclear Information System (INIS)

    Layman, John Scott

    1999-01-01

    The privatization efforts at the U.S. Department of Energy's Hanford Nuclear Reservation have been very successful primarily due to a disciplined process for project selection and execution. Early in the development of Privatization at Hanford, the Department of Energy determined that a disciplined alternatives generation and analysis (AGA) process would furnish the candidate projects with the best probability for success. Many factors had to be considered in the selection of projects. Westinghouse Hanford Company was assigned to develop this process and facilitate the selection of the first round of candidate privatization projects. Team members for the AGA process were assembled from all concerned organizations and skill groups. Among the selection criteria were legal, financial and technical considerations which had to be weighed

  5. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52 was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  6. Independent technical reviews for groundwater and soil remediation projects at US Department Of Energy sites - 59188

    International Nuclear Information System (INIS)

    Kaback, Dawn S.; Chamberlain, Grover; Morse, John G.; Petersen, Scott W.

    2012-01-01

    The US Department of Energy Office of Environmental Management has supported independent technical reviews of soil and groundwater projects at multiple DOE sites over the last 10 years. These reviews have resulted in significant design improvements to remedial plans that have accelerated cleanup and site closure. Many have also resulted in improved understanding of complex subsurface conditions, promoting better approaches to design and implementation of new technologies. Independent technical reviews add value, because they provide another perspective to problem solving and act as a check for especially challenging problems. By bringing in a team of independent experts with a broad experience base, alternative solutions are recommended for consideration and evaluation. In addition, the independence of the panel is significant, because it is able to address politically sensitive issues. The expert panel members typically bring lessons learned from other sites to help solve the DOE problems. In addition, their recommendations at a particular site can often be applied at other sites, making the review even more valuable. The review process can vary, but some common lessons ensure a successful review: - Use a multi-disciplinary broadly experienced team; - Engage the panel early and throughout the project; - Involve regulators and stakeholders in the workshop, if appropriate. - Provide sufficient background information; - Close the workshop with a debriefing followed by a written report. Many groundwater remediation challenges remain at DOE sites. Independent technical reviews have and will ensure that the best capabilities and experience are applied to reduce risks and uncertainties. Even though the groundwater remediation industry has developed significantly over the last twenty years, advancements are needed to address the complexities of the subsurface at the DOE sites. These advancements have tremendous potential to save millions of dollars and to accelerate the

  7. Corrections Education. Washington's Community and Technical Colleges

    Science.gov (United States)

    Washington State Board for Community and Technical Colleges, 2015

    2015-01-01

    The Washington State Department of Corrections contracts with community colleges to provide basic education and job training at each of the state's 12 adult prisons so upon release, individuals are more likely to get jobs and less likely to return. Washington State community colleges build a bridge for offenders to successfully re-enter…

  8. Deploying SHRP2 renewal 10 guidebook for project management strategies for complex projects in the Georgia Department of Transportation.

    Science.gov (United States)

    2017-01-01

    The Georgia Department of Transportation (GDOT) was selected by the Federal Highway Administration (FHWA) for the Strategic Highway Research Program 2 (SHRP2) Lead Adopter Incentive Implementation Assistance Grant to deploy the Renewal 10 (R10) Guide...

  9. U.S. Army Corps of Engineers and U.S. Department of Energy partnering for cleanup of the 1100 Area, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Johansen, M.; Liias, R.; Chong, R.

    1994-01-01

    The US Department of Energy's Hanford Site was listed on the National Priorities List (NPL) in July 1989 and was divided and listed as four Sites: the 1100 Area, the 100 Area, the 200 Area, and the 300 Area. Each Area was further divided into sub-units called Operable Units. This paper describes Remedial Investigation and Feasibility Study activities for the 1100 Area leading to the first Record of Decision at the Hanford Site. Key issues included: (1) Definition of future land use; risk assessments and resulting remedial actions depended heavily upon future land use definition because no significant exposure pathways currently exist for the Site, (2) Potential impacts of groundwater contamination to a nearby groundwater well field supplying potable water to Richland, (3) Coordination with an offsite potentially responsible party (PRP) from whose property the groundwater contamination emanated, and (4) The development and determination of precedent setting cleanup requirements and approaches for the entire Hanford Site. The US Army Corps of Engineers, Walla Walla District, performed work leading to the signing of the Record of Decision in September, 1993. The Corps continues to perform investigative, design, and remedial action work at areas of the Site including activities supporting the cleanup and ultimate release of two large portions of the Hanford Site known as the Arid Lands Ecology Reserve (ALE) and the North Slope. These two areas comprise more than half of the total area of the entire Hanford reservation

  10. Residential Energy Efficiency Potential: Washington

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, Eric J [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-11-27

    Energy used by Washington single-family homes that can be saved through cost-effective improvements. Prepared by Eric Wilson and Noel Merket, NREL, and Erin Boyd, U.S. Department of Energy Office of Energy Policy and Systems Analysis.

  11. Final Report to the Department of the Energy for Project Entitled Rare Isotope Science Assessment Committee

    International Nuclear Information System (INIS)

    Shapero, Donald; Meyer, Timothy I.

    2007-01-01

    The Rare Isotope Science Assessment Committee (RISAC) was convened by the National Research Council in response to an informal request from the DOE's Office of Nuclear Physics and the White House Office of Management and Budget. The charge to the committee is to examine and assess the broader scientific and international contexts of a U.S.-based rare-isotope facility. The committee met for the first time on December 16-17, 2005, in Washington, DC, and held three subsequent meetings. The committee's's final report was publicly released in unedited, prepublication form on Friday, December 8, 2006. The report was published in full-color by the National Academies Press in April 2007. Copies of the report were distributed to key decision makers and stakeholders around the world.

  12. Department of Energy Operation Quality Assurance Program for the Waste Isolation Pilot Plant (WIPP) Project (Carlsbad, New Mexico)

    International Nuclear Information System (INIS)

    1987-12-01

    The purpose of this plan is to describe the Quality Assurance (QA)reverse arrow Program to be established and implemented by the US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Project Office (WPO) and by the Project Participants: the Scientific Advisor (Sandia National Laboratory) and the Management and Operating Contractor (Westinghouse Electric Corporation). This plan addresses the Pre-Operational and Operational phases of the WIPP Project not addressed under the construction phase. This plan also requires the QA Programs for DOE and Project Participants to be structured so as to comply with this plan and ANSI-ASME NQA-1. The prime responsibility for Operational Quality Assurance rests with the DOE WIPP Project Office and is implemented through the combined efforts of the Scientific Advisor and the Management and Operating Contractor. Overviews of selected operational and testing activities will be are conducted in accordance with prescribed requirements and that adequate documentation of these activities is maintained. 4 figs

  13. Willapa Bay, Washington Benthic Habitats 1995 Biotic

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — In June 1995, the Columbia River Estuary Study Taskforce (CREST) acquired 295 true color aerial photographs (1:12,000) of Willapa Bay, Washington, from the State of...

  14. Willapa Bay, Washington Benthic Habitats 1995 Geoform

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — In June 1995, the Columbia River Estuary Study Taskforce (CREST) acquired 295 true color aerial photographs (1:12,000) of Willapa Bay, Washington, from the State of...

  15. Willapa Bay, Washington Benthic Habitats 1995 Substrate

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — In June 1995, the Columbia River Estuary Study Taskforce (CREST) acquired 295 true color aerial photographs (1:12,000) of Willapa Bay, Washington, from the State of...

  16. Southwestern Washington 6 arc-second DEM

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The 6-second Southwest Washington Elevation Grid provides bathymetric data in ASCII raster format of 6-second resolution in geographic coordinates. This grid is...

  17. Physical, chemical, and other data collected using meteorological sensors, secchi disk, transmissometer, and CTD casts from the THOMAS WASHINGTON as part of the International Decade of Ocean Exploration / North Pacific Experiment (IDOE/NORPAX) project from 21 January - 17 February 1974 (NODC Accession 7800629)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Physical, chemical, and other data were collected using meteorological sensors, secchi disk, transmissometer, and CTD casts from THOMAS WASHINGTON from January 21,...

  18. Nutrients and physical data from the R/V Thomas Washington and the R/V Oshoru Maru using bottle and CTD casts as part of the Inner Shelf Transport and Recycling (ISHTAR) project from 12 June 1986 to 19 October 1988 (NODC Accession 0000333)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Nutrients and physical data were collected from the R/V THOMAS WASHINGTON and R/V OSHORU MARU from June 12, 1986 to October 19, 1988. Data were submitted by...

  19. Macronutrient data from bottle casts from the R/V WECOMA off the coast of Washington and Oregon in support of the National Science Foundation (NSF) Coastal Ocean Processes (CoOP) and River Influences on Shelf Ecosystems (RISE) projects from 08 July 2004 to 13 June 2006 (NODC Accession 0049434)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The CoOP RISE program collected CTD and water chemistry (macronutrients, chlorophyll) data during four cruises from 2004-2006 off the Oregon and Washington coast,...

  20. Evaluation of the Montana Department of Transportation's research project solicitation, prioritization, and selection process

    Science.gov (United States)

    2008-05-01

    The Montana Department of Transportation (MDT) contracted the Bureau of Business and Economic Research at the University of Montana Missoula to conduct research to determine how other states solicit, prioritize, and select research problem statem...

  1. The State of Hawaii Department of Education Job Sharing Pilot Project.

    Science.gov (United States)

    Hawaii State Dept. of Education, Honolulu.

    Intended to test the feasibility of job-sharing in Hawaii's schools, this project was set up to provide job sharing of one hundred teaching positions on a fifty-fifty basis between experienced tenured teachers and new hires. The report describes the purpose and intent of the project; defines job sharing; establishes tentative guidelines for…

  2. MicroBooNE project team recognized by Department of Energy | News

    Science.gov (United States)

    Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of

  3. Documenting cost and performance for environmental remediation projects: Department of Energy Office of Environmental Management

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-08

    The purpose of this DOE guide is to facilitate the use of consistent procedures to document cost and performance information for projects involving the remediation of media contaminated with hazardous and radioactive wastes. It provides remedial action project managers with a standardized set of data to document completed remediation projects. Standardized reporting of data will broaden the utility of the information, increase confidence in the effectiveness of future remedial technologies, and enhance the organization, storage and retrieval of relevant information for future cleanup projects. The foundation for this guide was laid down by the Federal Remediation Technologies Roundtable (FRTR) in their publication, Guide to Documenting Cost and Performance for Remediation Projects, EPA-542-B- 95-002. Member agencies of the FRTR include the US EPA, the US DOD, the US DOE, and the US DOI. All the member agencies are involved in site remediation projects and anticipate following the guidance provided in the above reference. Therefore, there is much to be gained for DOE to be consistent with the other member agencies as it will be easier to compare projects across different agencies and also to learn from the experiences of a wider spectrum of prior completed projects.

  4. US Department of Energy Uranium Mill Tailings Remedial Action ground water Project

    International Nuclear Information System (INIS)

    1993-01-01

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA processing sites. The compliance strategy for the processing sites must satisfy requirements of the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1988). This scope of work will entail the following activities, on a site-specific basis: Development of a compliance strategy based upon modification of the UMTRA Surface Project remedial action plans (RAP) or development of Ground Water Project RAPs with NRC and state or tribal concurrence on the RAP; implementation of the RAP to include establishment of institutional controls, where appropriate; institution of long-term verification monitoring for transfer to a separate DOE program on or before the Project end date; and preparation of completion reports and final licensing on those sites that will be completed prior to the Project end date

  5. Building Ecological and Community Resilience and Measuring Success of the Department of Interior Hurricane Sandy Resilience Projects

    Science.gov (United States)

    Taylor, S. M.; Worman, S. L.; Bennett, R.; Bassow, A.

    2017-12-01

    The Department of the Interior (DOI) partnered with the National Fish and Wildlife Foundation (NFWF) to administer an external funding competition to support coastal resilience projects in the region affected by Hurricane Sandy. The projects complement the DOI Bureau-led projects, but are led by state and local governments, universities, non-profits, community groups, tribes, and other non-Federal entities. In total, the Hurricane Sandy Resilience Program invested over $750 million in approximately 180 projects to repair damage and improve the resilience of habitats, communities and infrastructure to future storms and sea level rise. Project activities include waterway connection and opening, living shoreline, marsh restoration, community resilience planning, data/mapping/modeling, and beach and dune restoration. DOI and NFWF initiated a resilience assessment in 2015 to evaluate the impact of this investment. The assessment began by clarifying the program's resilience goals and the development of ecological and socio-economic metrics across the project activities. Using these metrics, the evaluation is assessing the ecological and community outcomes, cost effectiveness of activities, improved scientific understanding, and temporal and spatial scaling of benefits across resilience activities. Recognizing the unique opportunity afforded by the scale and distribution of projects, NFWF and DOI have invested in monitoring through 2024 to better understand how these projects perform over time. This presentation will describe the evaluation questions, approach, long-term monitoring, online metrics portal, and findings to date.

  6. An overview of the U.S. Department of Energy Experimental Boiling Water Reactor Decontamination and Decommissioning Project

    International Nuclear Information System (INIS)

    Murphie, W.E.; Mckernan, M.L.

    1991-01-01

    This paper provides an overview of the U.S. Department of Energy's (DOE) Experimental Boiling Water Reactor (EBWR) Decontamination and Decommissioning (D and D) Project. Physical decommissioning work started in 1986 and is scheduled for completion in 1994. The project total estimated cost is 14.3 million (1990, U.S.) dollars. The reactor pressure vessel will be removed by segmentation. Another notable project feature is that D and D operations were planned for and carried out with a small work force comprised of four to six D and D laborers, one or two health physics technicians, an engineer, and a project manager. When the D and D work is completed the facility will be recycled for other productive uses. (author)

  7. Intentional and unintentional poisoning in Pakistan: a pilot study using the Emergency Departments surveillance project.

    Science.gov (United States)

    Khan, Nadeem; Pérez-Núñez, Ricardo; Shamim, Nudrat; Khan, Uzma; Naseer, Naureen; Feroze, Asher; Razzak, Junaid; Hyder, Adnan A

    2015-01-01

    Acute poisoning is one of the most common reasons for emergency department visits around the world. In Pakistan, the epidemiological data on poisoning is limited due to an under developed poison information surveillance system. We aim to describe the characteristics associated with intentional and unintentional poisoning in Pakistan presenting to emergency departments. The data was extracted from the Pakistan National Emergency Department Surveillance (Pak-NEDS) which was an active surveillance conducted between November 2010 and March 2011. All patients, regardless of age, who presented with poisoning to any of Pakistan's seven major tertiary care centers' emergency departments, were included. Information about patient demographics, type of poisoning agent, reason for poisoning and outcomes were collected using a standard questionnaire. Acute poisoning contributed to 1.2% (n = 233) of patients with intentional and unintentional injuries presenting to EDs of participating centers. Of these, 68% were male, 54% were aged 19 to 44 and 19% were children and adolescents (<18 years). Types of poisoning included chemical/gas (43.8%), drug/medicine (27%), alcohol (16.7%) and food/plant (6%). In half of all patients the poisoning was intentional. A total of 11.6% of the patients were admitted and 6.6% died. Poisoning causes more morbidity and mortality in young adults in Pakistan compared to other age groups, half of which is intentional. Improving mental health, regulatory control for hazardous chemicals and better access to care through poison information centers and emergency departments will potentially help control the problem.

  8. 76 FR 59394 - Big Eddy-Knight Transmission Project

    Science.gov (United States)

    2011-09-26

    ... DEPARTMENT OF ENERGY Bonneville Power Administration Big Eddy-Knight Transmission Project AGENCY... Eddy-Knight Transmission Project in Wasco County, Oregon and Klickitat County, Washington. Construction of the Big Eddy-Knight Transmission Project will accommodate long-term firm transmission requests...

  9. Progress and Lessons Learned in Transuranic Waste Disposition at The Department of Energy's Advanced Mixed Waste Treatment Project

    International Nuclear Information System (INIS)

    J.D. Mousseau; S.C. Raish; F.M. Russo

    2006-01-01

    This paper provides an overview of the Department of Energy's (DOE) Advanced Mixed Waste Treatment Project (AMWTP) located at the Idaho National Laboratory (INL) and operated by Bechtel BWXT Idaho, LLC(BBWI) It describes the results to date in meeting the 6,000-cubic-meter Idaho Settlement Agreement milestone that was due December 31, 2005. The paper further describes lessons that have been learned from the project in the area of transuranic (TRU) waste processing and waste certification. Information contained within this paper would be beneficial to others who manage TRU waste for disposal at the Waste Isolation Pilot Plant (WIPP)

  10. First experience with the traumatological PACS project at the University of Innsbruck department of Radiology

    International Nuclear Information System (INIS)

    Peer, S.; Peer, R.; Jaschke, W.; Vogl, R.; Baldauf, E.

    1998-01-01

    Radiography in an emergency setting is a demanding task, in technical as well as in logistical terms. Rapid acquisition of high quality radiographs under difficult conditions, for example severely injured patients with multi-organ trauma is important. All image data and radiological reports must be transmitted to the trauma surgeon as soon as possible. To meet these needs with the promising means of modern X-ray technology, we decided to implement a completely digital X-ray division inside the new outpatient trauma department. In the setting of an outpatient emergency department digital radiography and PACS cannot be realised without problems. We present our first experience with the installation and 10 months filmless routine in the X-ray division for traumatology outpatients at the university of Innsbruck department of radiology. (orig.) [de

  11. Missouri Department of Natural Resources Hazardous Waste Program Weldon Spring site remedial action project. Status of project to date January 1997

    International Nuclear Information System (INIS)

    1998-01-01

    This document describes the progress made by the Missouri Department of Natural Resources (MDNR) during the fourth year (1996) of the Agreement in Support (AIS) in its oversight role of the Weldon Springs Site Remedial Action Project (WSSRAP). The fourth year at the Weldon Springs Site shows sustained progress as the project moves through the final design and into the remedial action phases of the Chemical Plant Operable Unit. The remedial action phase includes the Foundations Removal work package, Chemical Solidification and Stabilization, and disposal cell

  12. Current and Projected Characteristics and Unique Health Care Needs of the Patient Population Served by the Department of Veterans Affairs

    OpenAIRE

    Eibner, Christine; Krull, Heather; Brown, Kristine M.; Cefalu, Matthew; Mulcahy, Andrew W.; Pollard, Michael; Shetty, Kanaka; Adamson, David M.; Amaral, Ernesto F. L.; Armour, Philip; Beleche, Trinidad; Bogdan, Olena; Hastings, Jaime; Kapinos, Kandice; Kress, Amii

    2016-01-01

    The Veterans Access, Choice, and Accountability Act of 2014 addressed the need for access to timely, high-quality health care for veterans. Section 201 of the legislation called for an independent assessment of various aspects of veterans' health care. The RAND Corporation was tasked with an assessment of the current and projected demographics and health care needs of patients served by the Department of Veterans Affairs (VA). The number of U.S. veterans will continue to decline over the next...

  13. Missouri Department of Natural Resources Hazardous Waste Program Weldon Spring site remedial action project. Status to date January 1998

    International Nuclear Information System (INIS)

    1998-01-01

    This document describes the progress made by the Missouri Department of Natural Resources (MDNR) during the fifth year (1997) of the Agreement in Support (AIS) in its oversight role of the Weldon Springs Site Remedial Action Project (WSSRAP). Staffing issues this year have been a challenge with the resignation of an Environmental Specialist (ES) in June 1997, and the death of Robert Stovall, an Environmental Engineer (EE) II in August 1997. Progress made during this period includes securing a contract laboratory, participation in several workgroup meetings for activities at the site, oversight of the Feasibility Study/Proposed Plan (FS/PP), coordination between the US Department of Energy and the various State regulatory programs and interactions with the local public drinking water supply agency and health departments

  14. Quality improvement primer part 1: Preparing for a quality improvement project in the emergency department.

    Science.gov (United States)

    Chartier, Lucas B; Cheng, Amy H Y; Stang, Antonia S; Vaillancourt, Samuel

    2018-01-01

    Emergency medicine (EM) providers work in a fast-paced and often hectic environment that has a high risk for patient safety incidents and gaps in the quality of care. These challenges have resulted in opportunities for frontline EM providers to play a role in quality improvement (QI) projects. QI has developed into a mature field with methodologies that can dramatically improve the odds of having a successful project with a sustainable impact. However, this expertise is not yet commonly taught during professional training. In this first of three articles meant as a QI primer for EM clinicians, we will introduce QI methodology and strategic planning using a fictional case study as an example. We will review how to identify a QI problem, define components of an effective problem statement, and identify stakeholders and core change team members. We will also describe three techniques used to perform root cause analyses-Ishikawa diagrams, Pareto charts and process mapping-and how they relate to preparing for a QI project. The next two papers in this series will focus on the execution of the QI project itself using rapid-cycle testing and on the evaluation and sustainability of QI projects.

  15. GENRE ANALYSIS OF THE ENGLISH FINAL PROJECT ABSTRACTS WRITTEN BY THE STUDENTS OF ENGLISH EDUCATION DEPARTMENT OF IKIP PGRI SEMARANG

    Directory of Open Access Journals (Sweden)

    Wiyaka Wiyaka

    2010-12-01

    Full Text Available This study is specifically focused on the student final project abstract based on genre analysis which covers the study of the generic structure and the linguistic features. The statements of the study are: (1. How do the students of English Education Department of IKIP PGRI Semarang realize the generic structure in their final project abstracts (2. How do they realize the linguistic features in their final project abstracts, and (3. What is the contribution of the result of the study to the English Education Program of IKIP PGRI Semarang. The main purpose of this study is to find out the generic structure and linguistic features of the final project abstracts and analyze the contribution of this study to the English Department. This study applies the descriptive qualitative method. The object of this study is the final project abstracts written by English Education Department students of ‘IKIP PGRI Semarang’. The total of 10 final projects formed the data of this study. The data of the study were analyzed using the genre analysis approach. The first step of data analysis was identifying the Moves which was done by using Linguistic evidence and understanding the texts. The finding shows that only some of the final project abstracts made by the students of IKIP PGRI applied the five Moves. It is found that two Moves are applied in all abstracts, they are Purpose and Method Moves (100%. Situating the research is used in five abstracts (50%. Meanwhile the third move that is the Result Move used in eight abstracts (80%. The Conclusion Move found in five abstracts (50%. The result of the analysis showed that two personal pronouns were found in the final project abstracts. Personal pronouns such as ‘the writer’ and ‘the researcher’ were found in all of the abstracts. Personal pronoun ‘she’ was found in one abstract. Finally, there are only five expressions of hedges that are used in the final project abstracts, they

  16. ENVIRONMENTAL MANAGEMENT SCIENCE PROGRAM RESEARCH PROJECTS TO IMPROVE DECONTAMINATION AND DECOMMISIONING OF U.S. DEPARTMENT OF ENERGY FACILITIES

    International Nuclear Information System (INIS)

    Phillips, Ann Marie

    2003-01-01

    This paper describes fourteen basic science projects aimed at solving decontamination and decommissioning (D and D) problems within the U.S. Department of Energy (DOE). Funded by the Environmental Science Management Program (EMSP), these research projects address D and D problems where basic science is needed to expand knowledge and develop solutions to help DOE meet its cleanup milestones. EMSP uses directed solicitations targeted at identified Environmental Management (EM) needs to ensure that research results are directly applicable to DOE's EM problems. The program then helps transition the projects from basic to applied research by identifying end-users and coordinating proof-of-principle field tests. EMSP recently funded fourteen D and D research projects through the directed solicitation process. These research projects will be discussed, including description, current status, and potential impact. Through targeted research and proof-of-principle tests, it is hoped that EMSP's fourteen D and D basic research projects will directly impact and provide solutions to DOE's D and D problems

  17. ENVIRONMENTAL MANAGEMENT SCIENCE PROGRAM RESEARCH PROJECTS TO IMPROVE DECONTAMINATION AND DECOMMISIONING OF U.S. DEPARTMENT OF ENERGY FACILITIES

    Energy Technology Data Exchange (ETDEWEB)

    Phillips, Ann Marie

    2003-02-27

    This paper describes fourteen basic science projects aimed at solving decontamination and decommissioning (D&D) problems within the U.S. Department of Energy (DOE). Funded by the Environmental Science Management Program (EMSP), these research projects address D&D problems where basic science is needed to expand knowledge and develop solutions to help DOE meet its cleanup milestones. EMSP uses directed solicitations targeted at identified Environmental Management (EM) needs to ensure that research results are directly applicable to DOE's EM problems. The program then helps transition the projects from basic to applied research by identifying end-users and coordinating proof-of-principle field tests. EMSP recently funded fourteen D&D research projects through the directed solicitation process. These research projects will be discussed, including description, current status, and potential impact. Through targeted research and proof-of-principle tests, it is hoped that EMSP's fourteen D&D basic research projects will directly impact and provide solutions to DOE's D&D problems.

  18. Project EXCEL: Sheraton Wharf, Room Service Department. English Communication, Module 1.

    Science.gov (United States)

    Career Resources Development Center, Inc., San Francisco, CA.

    Project EXCEL is a federally-funded workplace literacy program involving hotel enterprises in the San Francisco (California) Bay area. Its focus is on identification and instruction of literacy skills essential to job success for limited-English-proficient (LEP) workers. Training is intended to enable employees to understand written work orders,…

  19. Project EXCEL: Holiday Inn at Union Square, Housekeeping Department. Safety and Security, Module 2.

    Science.gov (United States)

    Career Resources Development Center, Inc., San Francisco, CA.

    Project EXCEL is a federally-funded workplace literacy program involving hotel enterprises in the San Francisco (California) Bay area. Its focus is on identification and instruction of literacy skills essential to job success for limited-English-proficient (LEP) workers. Training is intended to enable employees to understand written work orders,…

  20. Best in Class Project Management and Contract Management Initiative at the Department of Energy's Office of Environmental Management

    International Nuclear Information System (INIS)

    Van Camp, S.G.; Stevenson, J.S.; Deiters, M.G.

    2009-01-01

    Since its founding in 1989, the U.S. Department of Energy (DOE), Office of Environmental Management (EM) has struggled with a legacy of inadequate project and contract management. This has been manifested in recurring scope changes, cost overruns and schedule delays, and has been documented in multiple internal and external reviews. To address this issue, EM has developed a vision for building a 'Best in Class' Project Management and Contract Management (BICPM) organization. To develop the strategy and implement the process to accomplish this vision, EM contracted with the U.S. Army Corps of Engineers (USACE) and their support contractors. EM and the USACE Team developed a five-phased approach to implement the BICPM Initiative: (I) develop assessment criteria, (II) assess existing project and contract management capabilities, (III) develop an implementation plan, (IV) implement corrective actions, and (V) institutionalize BICPM. Under Phases I and II, the USACE Team assessed the status of project and contract management capabilities at 16 EM offices. These assessments evaluated strengths and weaknesses in 12 key project management capabilities and benchmarks and three contract management benchmarks. Under Phase III, EM and the USACE Team developed the Corporate Implementation Plan which identified the key challenges and provided a road-map to address these challenges and to implement BICPM. These challenges included: Federal staffing shortages; integration of project and contract management; further development of project-oriented culture; project baseline maintenance; consistent implementation of the DOE order for project management, 413.3A; and role of EM Headquarters in BICPM. The shortage of qualified resources dedicated to supporting Federal project and contract management functions was identified as a primary cause for project and contract management difficulties within EM. The Corporate Implementation Plan outlined a set of 18 specific Recommended Priority

  1. Implementation plan for the programmatic environmental impact statement for the Department of Energy UMTRA Ground Water Project

    International Nuclear Information System (INIS)

    1994-04-01

    Under the Uranium Mill Tailings Remedial Action (UMTRA) Project, the U.S. Department of Energy (DOE) is cleaning up contamination to protect human health and the environment at 24 inactive uranium processing sites located in 10 states. Five of the sites are either on or near Native American lands. The UMTRA Project is divided into two projects: Surface and Ground Water. On November 18, 1992, the DOE issued a notice of intent (57 FR 54374, 1992) to prepare a programmatic environmental impact statement (PEIS) for the UMTRA Ground Water Project. The PEIS will result in a record of decision that will determine how the UMTRA Ground Water Project will address ground water contamination resulting from milling operations at the UMTRA Project processing sites. DOE regulations (10 CFR section 1021.312) require that an implementation plan be prepared to provide guidance for preparing a PEIS and to record the results of the scoping process. This implementation plan describes and records the results of the PEIS scoping process; summarizes comments received and their disposition; describes the purpose of and need for agency action, the proposed action, and alternatives; lists alternatives considered and eliminated from review; identifies cooperating agencies, their roles, and responsibilities; provides a draft PEIS outline, which includes the planned PEIS scope and content (Attachment A); and provides a schedule for the PEIS process. This plan will be placed in the UMTRA Project libraries listed in Attachment B. The PEIS will identify and evaluate the potential impacts associated with alternatives for conducting the UMTRA Ground Water Project. The PEIS will not assess site-specific impacts; site-specific impacts must be analyzed in separate National Environmental Policy Act (NEPA) documents that will tier off the PEIS. This tiering process will streamline the preparation of site-specific NEPA documents

  2. Smart Grid Communications Security Project, U.S. Department of Energy

    Energy Technology Data Exchange (ETDEWEB)

    Barnes, Frank [Univ. of Colorado, Boulder, CO (United States)

    2012-09-01

    There were four groups that worked on this project in different areas related to Smart Girds and Security. They included faculty and students from electric computer and energy engineering, law, business and sociology. The results of the work are summarized in a verity of reports, papers and thesis. A major report to the Governor of Colorado’s energy office with contributions from all the groups working on this project is given bellow. Smart Grid Deployment in Colorado: Challenges and Opportunities, Report to Colorado Governor’s Energy Office and Colorado Smart Grid Task Force(2010) (Kevin Doran, Frank Barnes, and Puneet Pasrich, eds.) This report includes information on the state of the grid cyber security, privacy, energy storage and grid stability, workforce development, consumer behavior with respect to the smart grid and safety issues.

  3. Massachusetts' participation in the US Department of Energy's Crystalline Repository Project: Final report

    International Nuclear Information System (INIS)

    1986-12-01

    The purpose of this report is to review activities of the Crystalline Rock Project in Massachusetts, the context in which it arose, and the implications and possibilities of future federal policy decisions on the siting of a high-level waste repository in a crystalline rock body. Although Massachusetts has been eliminated from consideration, there are still issues of concern to be resolved regarding the potential impacts upon Massachusetts if a site were ever to be chosen in New England

  4. Massachusetts' participation in the US Department of Energy's Crystalline Repository Project: Final report

    International Nuclear Information System (INIS)

    Dukakis, M.S.; Johnston, P.W.; Walker, B. Jr.

    1986-12-01

    The purpose of this report is to review activities of the Crystalline Rock Project (CRP) in Massachusetts, the context in which it arose, and the implications and possibilities of future federal policy decisions on the siting of a HLW repository in a crystalline rock body. Although Massachusetts has been eliminated from consideration, there are still issues of concern to be resolved regarding the potential impacts upon Massachusetts if a site were ever to be chosen in New England

  5. Nuclear propulsion technology development - A joint NASA/Department of Energy project

    Science.gov (United States)

    Clark, John S.

    1992-01-01

    NASA-Lewis has undertaken the conceptual development of spacecraft nuclear propulsion systems with DOE support, in order to establish the bases for Space Exploration Initiative lunar and Mars missions. This conceptual evolution project encompasses nuclear thermal propulsion (NTP) and nuclear electric propulsion (NEP) systems. A technology base exists for NTP in the NERVA program files; more fundamental development efforts are entailed in the case of NEP, but this option is noted to offer greater advantages in the long term.

  6. DEPLOYMENT OF GOALS AND PROJECT PERFORMANCE MANAGEMENT CASE STUDY IN THE ENGINEERING DEPARTMENT OF PETROBRAS

    Directory of Open Access Journals (Sweden)

    Antonio Carlos de Lemos Oliveira

    2011-05-01

    Full Text Available The dynamic technology innovations and the constant changes in the world geopolitical scenarios have been creating turbulences in the majority of the environments in which the petroleum industry organizations are situated. Therefore, it is vital for the development and survival of these organizations that they establish a management and planning process capable of offering flexible answers to all challenges that arise in this business. Inside this context, this paper intends to investigate the ongoing techniques used for the deployment of goals and performance management of the employees who work for the engineering department of Petrobras, comparing the behavior of four organization structures named UIE - Unidade de Implementação de Empreendimento, considering some of their scores and the results of the existing individual management body of each of these structures. The main research instruments used in this case study were the documental analyses and semi-structured interviews with the main authors of the formulation and implementation process for the planning and management of the company, beyond the direct observation of these process. The paper accomplishes its goals and brings results and proposals that perceive a continuous development of the Performance Management system in the engineering department of Petrobras.

  7. Examples of Department of Energy Successes for Remediation of Contaminated Groundwater: Permeable Reactive Barrier and Dynamic Underground Stripping ASTD Projects

    International Nuclear Information System (INIS)

    Purdy, C.; Gerdes, K.; Aljayoushi, J.; Kaback, D.; Ivory, T.

    2002-01-01

    Since 1998, the Department of Energy's (DOE) Office of Environmental Management has funded the Accelerated Site Technology Deployment (ASTD) Program to expedite deployment of alternative technologies that can save time and money for the environmental cleanup at DOE sites across the nation. The ASTD program has accelerated more than one hundred deployments of new technologies under 76 projects that focus on a broad spectrum of EM problems. More than 25 environmental restoration projects have been initiated to solve the following types of problems: characterization of the subsurface using chemical, radiological, geophysical, and statistical methods; treatment of groundwater contaminated with DNAPLs, metals, or radionuclides; and other projects such as landfill covers, purge water management systems, and treatment of explosives-contaminated soils. One of the major goals of the ASTD Program is to deploy a new technology or process at multiple DOE sites. ASTD projects are encouraged to identify subsequent deployments at other sites. Some of the projects that have successfully deployed technologies at multiple sites focusing on cleanup of contaminated groundwater include: Permeable Reactive Barriers (Monticello, Rocky Flats, and Kansas City), treating uranium and organics in groundwater; and Dynamic Underground Stripping (Portsmouth, and Savannah River), thermally treating DNAPL source zones. Each year more and more new technologies and approaches are being used at DOE sites due to the ASTD program. DOE sites are sharing their successes and communicating lessons learned so that the new technologies can replace the baseline or standard approaches at DOE sites, thus expediting cleanup and saving money

  8. Family presence during trauma activations and medical resuscitations in a pediatric emergency department: an evidence-based practice project.

    Science.gov (United States)

    Kingsnorth, Jennifer; O'Connell, Karen; Guzzetta, Cathie E; Edens, Jacki Curreri; Atabaki, Shireen; Mecherikunnel, Anne; Brown, Kathleen

    2010-03-01

    The existing family presence literature indicates that implementation of a family presence policy can result in positive outcomes. The purpose of our evidence-based practice project was to evaluate a family presence intervention using the 6 A's of the evidence cycle (ask, acquire, appraise, apply, analyze, and adopt/adapt). For step 1 (ask), we propose the following question: Is it feasible to implement a family presence intervention during trauma team activations and medical resuscitations in a pediatric emergency department using national guidelines to ensure appropriate family member behavior and uninterrupted patient care? Regarding steps 2 through 4 (acquire, appraise, and apply), our demonstration project was conducted in a pediatric emergency department during the implementation of a new family presence policy. Our family presence intervention incorporated current appraisal of literature and national guidelines including family screening, family preparation, and use of family presence facilitators. We evaluated whether it was feasible to implement the steps of our intervention and whether the intervention was safe in ensuring uninterrupted patient care. With regard to step 5 (analyze), family presence was evaluated in 106 events, in which 96 families were deemed appropriate and chose to be present. Nearly all families (96%) were screened before entering the room, and all were deemed appropriate candidates. Facilitators guided the family during all events. One family presence event was terminated. In all cases patient care was not interrupted. Regarding step 6 (adopt/adapt), our findings document the feasibility of implementing a family presence intervention in a pediatric emergency department while ensuring uninterrupted patient care. We have adopted family presence as a standard practice. This project can serve as the prototype for others. Copyright (c) 2010 Emergency Nurses Association. Published by Mosby, Inc. All rights reserved.

  9. Job Sharing Pilot Project in the Department of Education: Final Evaluation. A Report to the Legislature of the State of Hawaii. No. 81-10.

    Science.gov (United States)

    Tanimura, Clinton T.

    Evaluation of a three-year pilot project in the Hawaii Department of Education focused on the extent to which it demonstrated the feasibility of job sharing as an employment alternative for classroom teachers. It also assessed project effectiveness, examined costs incurred by the project, and analyzed job sharing as a permanent employment option…

  10. Washington Tsunami Hazard Mitigation Program

    Science.gov (United States)

    Walsh, T. J.; Schelling, J.

    2012-12-01

    Washington State has participated in the National Tsunami Hazard Mitigation Program (NTHMP) since its inception in 1995. We have participated in the tsunami inundation hazard mapping, evacuation planning, education, and outreach efforts that generally characterize the NTHMP efforts. We have also investigated hazards of significant interest to the Pacific Northwest. The hazard from locally generated earthquakes on the Cascadia subduction zone, which threatens tsunami inundation in less than hour following a magnitude 9 earthquake, creates special problems for low-lying accretionary shoreforms in Washington, such as the spits of Long Beach and Ocean Shores, where high ground is not accessible within the limited time available for evacuation. To ameliorate this problem, we convened a panel of the Applied Technology Council to develop guidelines for construction of facilities for vertical evacuation from tsunamis, published as FEMA 646, now incorporated in the International Building Code as Appendix M. We followed this with a program called Project Safe Haven (http://www.facebook.com/ProjectSafeHaven) to site such facilities along the Washington coast in appropriate locations and appropriate designs to blend with the local communities, as chosen by the citizens. This has now been completed for the entire outer coast of Washington. In conjunction with this effort, we have evaluated the potential for earthquake-induced ground failures in and near tsunami hazard zones to help develop cost estimates for these structures and to establish appropriate tsunami evacuation routes and evacuation assembly areas that are likely to to be available after a major subduction zone earthquake. We intend to continue these geotechnical evaluations for all tsunami hazard zones in Washington.

  11. PROJECT BASED TASK TO IMPROVE THE ENGLISH DEPARTMENT STUDENTS‘ MASTERY IN CRITICAL WRITING

    Directory of Open Access Journals (Sweden)

    Ribut Surjowati

    2017-12-01

    Full Text Available The paper is aimed at describing the students‘ writing improvement in the EFL classroom after the implementation of Project Based Task (PBT was done in writing class of the fourth semester students in FBS-UWKS. For them, writing is difficult and complicated subject, they almost had no idea of what and how to write, which were caused by their lack of motivation and information of how and what they are writing. This research is classroom action research (CAR and the fourth semester students of UWKS were the subjects. Before PBT was implemented, 25% students got 70. It was due to their lack of motivation and anthusiam so that they had no idea of how to write the essay correctly. However, after PBT was implemented, the students‘ anthusiatic was increasing in writing. It is because they were involved in the learning process and designing their own challenging task. There were two cycles implemented and the students‘ writing score was improving significantly in the first cycle and in the second cycle, 81% students‘s passed success indicator. In conclusion, this PBT is a teaching technique which can improve the students‘ writing mastery

  12. W-320 Department of Health documentation

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    The purpose of this document is to gather information required to show that Project W-320 is in compliance with Washington State Department of Health requirements as specified in Radioactive Air Emissions Notice of Construction Project W-320, Tank 241-C-106 Sluicing, DOE/RL-95-45. Specifically, that W-320 is in compliance with ASME N509-1989 (Nuclear Power Plant Air-Cleaning Units and Components) and ASME N5 10-1989 (Testing of Nuclear Air Treatment Systems) for the 296-C-006 exhaust system

  13. W-320 Department of Health documentation

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, J.W.

    1998-08-07

    The purpose of this document is to gather information required to show that Project W-320 is in compliance with Washington State Department of Health requirements as specified in Radioactive Air Emissions Notice of Construction Project W-320, Tank 241-C-106 Sluicing, DOE/RL-95-45. Specifically, that W-320 is in compliance with ASME N509-1989 (Nuclear Power Plant Air-Cleaning Units and Components) and ASME N5 10-1989 (Testing of Nuclear Air Treatment Systems) for the 296-C-006 exhaust system.

  14. Evaluation of California's Alcohol and Drug Screening and Brief Intervention Project for Emergency Department Patients

    Directory of Open Access Journals (Sweden)

    Susan I Woodruff

    2013-05-01

    Full Text Available Introduction: Visits to settings such as emergency departments (EDs may present a “teachable moment” in that a patient may be more open to feedback and suggestions regarding their risky alcohol and illicit drug-use behaviors. Screening, Brief Intervention, and Referral to Treatment (SBIRT is an ’opportunistic’ public health approach that targets low-risk users, in addition to those already dependent on alcohol and/or drugs. SBIRT programs provide patients with comprehensive screening and assessments, and deliver interventions of appropriate intensity to reduce risks related to alcohol and drug use. Methods: This study used a single group pre-post test design to assess the effect of the California SBIRT service program (i.e., CASBIRT on 6 substance-use outcomes (past-month prevalence and number of days of binge drinking, illegal drug use, and marijuana use. Trained bilingual/bicultural Health Educators attempted to screen all adult patients in 12 EDs/trauma centers (regardless of the reason for the patient’s visit using a short instrument, and then delivered a brief motivational intervention matched to the patient’s risk level. A total of 2,436 randomly selected patients who screened positive for alcohol and/or drug use consented to be in a 6-month telephone follow-up interview. Because of the high loss to follow-up rate, we used an intention-to-treat approach for the data analysis. Results: Results of generalized linear mixed models showed modest reductions in all 6 drug- and alcohol-use outcomes. Men (versus women, those at relatively higher risk status (versus lower risk, and those with only one substance of misuse (versus both alcohol and illicit drug misuse tended to show more positive change. Conclusion: These results suggest that SBIRT services provided in acute care settings are associated with modest changes in self-reported recent alcohol and illicit drug use. [West J Emerg Med. 2013;14(3:263–270.

  15. U.S. Department of Energy Grand Junction Projects Office site environmental report for calendar year 1995

    International Nuclear Information System (INIS)

    1996-05-01

    This report presents information pertaining to environmental activities conducted during calendar year 1995 at the US Department of Energy (DOE) Grand Junction Projects Office (GJPO) facility in Grand Junction, Colorado. Environmental activities conducted at the GJPO facility during 1995 were associated with mixed-waste treatment, site remediation, off-site dose modeling, and radiological and nonradiological monitoring. As part of the GJPO Mixed-Waste Treatment Program, on-site treatability studies were conducted in 1995 that made use of pilot-scale evaporative-oxidation and thermal-desorption units and bench-scale stabilization. DOE-GJPO used some of its own mixed-waste as well as samples received from other DOE sites for these treatability studies. These studies are expected to conclude in 1996. Removal of radiologically contaminated materials from GJPO facility buildings was conducted under the provisions of the Grand Junction Projects Office Remedial Action Project. Remediation activities included the removal of 394 metric tons of contaminated material from Buildings 18 and 28 and revegetation activities on the GJPO site; remediation was conducted in compliance with applicable permits

  16. Final report for the Department of Energy funded cooperative agreement ''Electronic Research Demonstration Project'' [University electronic research administration demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Rodman, John

    1998-07-31

    This is the final report for the Department of Energy (DOE) funded cooperative agreement ''Electronic Research Demonstration Project (DE-FC02-92ER35180)'' for the period August 1994-July 1998. The goal of the project, referred to as NewERA, was to demonstrate the use of open standards for electronic commerce to support research administration, otherwise referred to as Electronic Research Administration (ERA). The NewERA demonstration project provided a means to test interagency standards developed within the Federal Grant Electronic Commerce Committee, a group comprised of federal granting agencies. The NewERA program was initiated by DOE. NewERA was comprised of three separate, but related, ERA activities in preaward administration, postaward administration, and secure Internet commerce. The goal of New ERA was to demonstrate an open standard implementation of ERA using electronic data interchange, e-mail and Internet transaction security between grant applicants and DOE, along with t h e other participating agencies.

  17. Federal/State cooperation in the licensing of a nuclear power project. A joint licensing process between the US Nuclear Regulatory Commission and the Washington State Energy Facility Site Evaluation Council

    International Nuclear Information System (INIS)

    1984-05-01

    This report summarizes and documents a joint environmental review and licensing process established between the US Nuclear Regulatory Commission (NRC) and the Washington State Energy Facility Site Evaluation Council (EFSEC) in 1980-1983 for the Skagit/Hanford Nuclear Project (S/HNP). It documents the agreements made between the agencies to prepare a joint environmental impact statement responsive to the requirements of the National Environmental Policy Act of 1969 (NEPA) and the Washington State Environmental Policy Act. These agreements also established protocol to conduct joint public evidentiary hearings on matters of mutual jurisdiction, thereby reducing the duplication of effort and increasing the efficiency of the use of resources of federal and state governments and other entities involved in the process. This report may provide guidance and rationale to licensing bodies that may wish to adopt some of the procedures discussed in the report in the event that they become involved in the licensing of a nuclear power plant project. The history of the S/HNP and of the agreement processes are discussed. Discussions are provided on implementing the joint review process. A separate section is included which presents independent evaluations of the process by the applicant, NRC, and EFSEC

  18. Literature Review for Texas Department of Transportation Research Project 0-4695: Guidance for Design in Areas of Extreme Bed-Load Mobility, Edwards Plateau, Texas

    National Research Council Canada - National Science Library

    Heitmuller, Franklin T; Asquith, William H; Fang, Xing; Thompson, David B; Wang, Keh-Han

    2005-01-01

    A review of the literature addressing sediment transport in gravel-bed river systems and structures designed to control bed-load mobility is provided as part of Texas Department of Transportation research project 0-4695...

  19. University of Washington

    Data.gov (United States)

    Federal Laboratory Consortium — The theme of the University of Washington based Center for Child Environmental Health Risks Research (CHC) is understanding the biochemical, molecular and exposure...

  20. Environmental Assessment Supplement: Proposed Military Construction Project, Deployable Medical System Training Area and Military Equipment Parking, Fairchild Air Force Base, Washington

    Science.gov (United States)

    2011-11-01

    banks, from the sagebrush plains into the lower mountains, often in ponderosa pine ( Pinus ponderosa) forest. In Washington, the species occurs with...area and within a designated conservation area. The community type, pinus ponderosa/symphocarpus albus is listed as a rare community type by the state...Formaldehyde 8.51 13.2 108-38-3; 106-42-3 M & p-xylene 0.89 1.38 78-93-3 Methyl ethyl ketone (2- butanone) 2.86 4.44 91-20-3 Naphthalene 0.24 0.365 95-47-6 O

  1. 1992 Colorado Economic Impact Study for the US Department of Energy and Colorado Department of Health Uranium Mill Tailings Remedial Action (UMTRA) Project

    International Nuclear Information System (INIS)

    1991-01-01

    The findings of the 1992 Colorado Economic Impact Study (CEIS) for the Uranium Mill Tailings Remedial Action (UMTRA) Project are outlined below. All dollar amounts used in the study are in year-of-expenditure dollars. The total funding requirement for the State of Colorado for the UMTRA Project is estimated to be $66.8 million, or 10 percent of the remedial action costs for the UMTRA Project in Colorado. The UMTRA Project will generate $487.5 million in gross labor income in Colorado between 1983 and 1996. This includes $54.4 million in state and local tax revenues and $41.2 million in federal individual income tax revenues. The net economic benefit of the UMTRA Project to Colorado is $355.1 million. For every dollar the State of Colorado invests in the UMTRA Project, it will realize $5.32 in gross labor income. The employment impact to the Western Slope region is significant. The UMTRA Project will create a total employment impact of 13,749 fulltime equivalents (FTES) spread over. a period of 13 years in seven site areas. Nearly 100 percent of the labor will be drawn from the local communities. The State of Colorado's Western Slope is anticipated to be minimally impacted by the phaseout of the UMTRA Project. Unlike industries that shut down operations without warning, the UMTRA Project workers, local government, and businesses know the schedule for completion and can consider and prepare for the impact of UMTRA Project conclusion. Further, because the majority of the work force is local, there has not been a significant investment in each community's infrastructure. Any small increases in the infrastructure will not be abandoned at the end of the UMTRA Project due to a marked increase in migration out of the local community

  2. Multi-Site Project Management A Program for Reducing the Cost of Technology Deployment at Department of Energy Sites

    International Nuclear Information System (INIS)

    Davis, N.R.; Selden, E.R.; Little, D.B.; Coleman, M.C.; Bennett, J.T.

    2009-01-01

    Retrieval and processing of High Level Waste (HLW) stored in Department of Energy (DOE) waste tanks is performed to support closure of the tanks as required by site specific regulatory agreements. Currently, there are four sites in the DOE Complex that have HLW tanks and must process and disposition HLW. As such, there is an opportunity to achieve an economy of scale and reduce duplication of efforts. Two or more sites typically have similar technology development and deployment needs. Technology development is already executed at the national level. As the technology is matured, the next step is to commission a design/build project. Typically each site performs this separately due to differences in waste type, tank design, site specific considerations such as proximity to the water table or to the site boundary. The focus of the individual sites tends to be on the differences between sites versus on the similarities thus there is an opportunity to minimize the cost for similar deployments. A team of engineers and project management professionals from the Savannah River Site has evaluated technology needs at the four HLW sites and determined that there is an economy of scale that can be achieved by specific technology deployments in the area of waste retrieval, waste pretreatment and waste disposition. As an example, the Waste on Wheels tank retrieval system (presented in the 2006 Waste Management Symposium) was designed and fabricated in portable modules that could be installed in HLW tanks at Hanford, Savannah River or Idaho. This same concept could be used for modular in-tank cesium removal process and equipment, tank cleaning mechanical equipment, and chemical tank cleaning process and equipment. The purpose of this paper is to present a multi-site project management approach that will reduce deployment costs and be consistent with DOE Order 413.3 project management principles. The approach will describe how projects can be managed by a lead site with

  3. Low-Temperature Projects of the Department of Energy's Geothermal Technologies Program: Evaluation and Lessons Learned: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Tom; Snyder, Neil; Gosnold, Will

    2016-12-01

    This paper discusses opportunities and challenges related to the technical and economic feasibility of developing power generation from geothermal resources at temperatures of 150 degrees C and lower. Insights from projects funded by the U.S. Department of Energy (DOE), Geothermal Technologies Office inform these discussions and provide the basis for some lessons learned to help guide decisions by DOE and the industry in further developing this resource. The technical basis for low-temperature geothermal energy is well established and the systems can be economic today in certain situations. However, these applications are far from a 'plug and play' product; successful development today requires a good knowledge of geothermal system design and operation.

  4. Environmental assessment of facility operations at the U.S. Department of Energy Grand Junction Projects Office, Grand Junction, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The US Department of Energy (DOE) has prepared a sitewide environmental assessment (EA) of the proposed action to continue and expand present-day activities on the DOE Grand Junction Projects Office (GJPO) facility in Grand Junction, Colorado. Because DOE-GJPO regularly proposes and conducts many different on-site activities, DOE decided to evaluate these activities in one sitewide EA rather than in multiple, activity-specific documents. On the basis of the information and analyses presented in the EA, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined by the National Environmental Policy Act (NEPA) of 1969. Therefore, preparation of an environmental impact statement is not required for facility operations, and DOE is issuing this Finding of No Significant Impact (FONSI).

  5. Environmental assessment of facility operations at the U.S. Department of Energy Grand Junction Projects Office, Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1996-06-01

    The US Department of Energy (DOE) has prepared a sitewide environmental assessment (EA) of the proposed action to continue and expand present-day activities on the DOE Grand Junction Projects Office (GJPO) facility in Grand Junction, Colorado. Because DOE-GJPO regularly proposes and conducts many different on-site activities, DOE decided to evaluate these activities in one sitewide EA rather than in multiple, activity-specific documents. On the basis of the information and analyses presented in the EA, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined by the National Environmental Policy Act (NEPA) of 1969. Therefore, preparation of an environmental impact statement is not required for facility operations, and DOE is issuing this Finding of No Significant Impact (FONSI)

  6. Low-Temperature Projects of the Department of Energy's Geothermal Technologies Program: Evaluation and Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Tom; Snyder, Neil; Gosnold, Will

    2016-10-23

    This paper discusses opportunities and challenges related to the technical and economic feasibility of developing power generation from geothermal resources at temperatures of 150 degrees C and lower. Insights from projects funded by the U.S. Department of Energy (DOE), Geothermal Technologies Office inform these discussions and provide the basis for some lessons learned to help guide decisions by DOE and the industry in further developing this resource. The technical basis for low-temperature geothermal energy is well established and the systems can be economic today in certain situations. However, these applications are far from a 'plug and play' product; successful development today requires a good knowledge of geothermal system design and operation.

  7. Environmental Management Department Quality Assurance Project Plan for Radionuclide Emission Measurements Project for compliance with National Emission Standards for Hazardous Air Pollutants (NESHAP)

    Energy Technology Data Exchange (ETDEWEB)

    Poole, D A

    1992-06-01

    This Quality Assurance Project Plan (QAPP) satisfies the quality assurance (QA) requirements in 40 CFR Part 61, Method 114, for ensuring that the radionuclide air emission measurements from the Y-12 Plant are representative; of a known precision and accuracy; and include administrative controls to ensure prompt response when emission measurements indicate an increase over normal radionuclide emissions. The QAPP ensures the quality of the Y-12 Plant radionuclide emission measurements data from the continuous samplers, breakthrough monitors, and minor radionuclide release points. The plan specifies the procedures for the management of the activities affecting the quality of the data for the Y-12 Plant Environmental Management Department (EMD) within the Health, Safety, Environment, and Accountability Division (HSEA).

  8. Environmental Management Department Quality Assurance Project Plan for Radionuclide Emission Measurements Project for compliance with National Emission Standards for Hazardous Air Pollutants (NESHAP)

    International Nuclear Information System (INIS)

    Poole, D.A.

    1992-06-01

    This Quality Assurance Project Plan (QAPP) satisfies the quality assurance (QA) requirements in 40 CFR Part 61, Method 114, for ensuring that the radionuclide air emission measurements from the Y-12 Plant are representative; of a known precision and accuracy; and include administrative controls to ensure prompt response when emission measurements indicate an increase over normal radionuclide emissions. The QAPP ensures the quality of the Y-12 Plant radionuclide emission measurements data from the continuous samplers, breakthrough monitors, and minor radionuclide release points. The plan specifies the procedures for the management of the activities affecting the quality of the data for the Y-12 Plant Environmental Management Department (EMD) within the Health, Safety, Environment, and Accountability Division (HSEA)

  9. Congress in Washington

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    Full text: Over 1200 accelerator physicists and engineers gathered in Washington mid-May for the 15th in the series of biennial Particle Accelerator Conferences (PAC) - the major US forum for accelerator physics and technology. For the first time since their inception, actual attendance declined, however the number of contributed papers stayed around 1500. CERN Director General designate Chris Llewellyn Smith spelled out the challenges with an opening talk underlining the deficiencies in today's Standard Model. From many directions comes the message that collision in the 1 TeV range must tell us something new - wherefore art thou SSC and LHC? The secondary shock waves of last year's (fortunately overturned) bid to cancel the SSC Superconducting Supercollider project still ripple around the USA, while progress towards authorization of CERN's LHC Large Hadron Collider has been slower than initially hoped. The new US administration has indicated a constant rate of SSC funding over the next four years; the figure is higher than the present budget but considerably below the originally proposed budget profile, implying that completion will be retarded by some three years beyond the end of the decade. The SSC Laboratory will clearly have problems to fight increased overall cost and sustain enthusiasm. CERN hopes for LHC blessing in time to allow machine completion by the year 2000. Pride of place at Washington went to DESY's HERA electron-proton collider - the major new facility since the previous PAC. Commissioning has been impressive and physics is well underway, with luminosity climbing towards the design figure. The varied user community of the ubiquitous synchrotron radiation facilities is now considerably larger than that of particle physics and has extensive industrial involvement. Three such machines have come into operation since the previous PAC - the 6 GeV European Synchrotron Radiation Facility at Grenoble, the 1.5 GeV Advanced Light Source

  10. Draft site characterization analysis of the site characterization report for the Basalt Waste Isolation Project, Hanford, Washington site. Appendices E through W

    International Nuclear Information System (INIS)

    1983-03-01

    Volume 2 contains Appendices E through W: potential for large-scale pump tests in the Grande Ronde; review of hydrochemical characterization related to flow system interpretation in Hanford basalts; limitations of packer-testing for head evaluation in Hanford basalts; hydrogeologic data integration for conceptual groundwater flow models; drilling mud effects on hydrogeologic testing; site issue analyses related to the nature at the present groundwater system at the Hanford site, Washington; structural and stratigraphic characteristics related to groundwater flow at the Hanford site, Washington; seismic hazard and some examples of hazard studies at Hanford; earthquake swarms in the Columbia Plateau; seismic ground motion at depth; failure modes for the metallic waste package component; degradation mechanisms of borosilicate glass; transport and retardation of radionuclides in the waste package; determination and interpretation of redox conditions and changes in underground high-level repositories; determination and interpretation of sorption data applied to radionuclide migration in underground repositories; solubility of radionuclide compounds presented in the BWIP site characterization report; and release rate from engineered system

  11. Current and Projected Characteristics and Unique Health Care Needs of the Patient Population Served by the Department of Veterans Affairs.

    Science.gov (United States)

    Eibner, Christine; Krull, Heather; Brown, Kristine M; Cefalu, Matthew; Mulcahy, Andrew W; Pollard, Michael; Shetty, Kanaka; Adamson, David M; Amaral, Ernesto F L; Armour, Philip; Beleche, Trinidad; Bogdan, Olena; Hastings, Jaime; Kapinos, Kandice; Kress, Amii; Mendelsohn, Joshua; Ross, Rachel; Rutter, Carolyn M; Weinick, Robin M; Woods, Dulani; Hosek, Susan D; Farmer, Carrie M

    2016-05-09

    The Veterans Access, Choice, and Accountability Act of 2014 addressed the need for access to timely, high-quality health care for veterans. Section 201 of the legislation called for an independent assessment of various aspects of veterans' health care. The RAND Corporation was tasked with an assessment of the current and projected demographics and health care needs of patients served by the Department of Veterans Affairs (VA). The number of U.S. veterans will continue to decline over the next decade, and the demographic mix and geographic locations of these veterans will change. While the number of veterans using VA health care has increased over time, demand will level off in the coming years. Veterans have more favorable economic circumstances than non-veterans, but they are also older and more likely to be diagnosed with many health conditions. Not all veterans are eligible for or use VA health care. Whether and to what extent an eligible veteran uses VA health care depends on a number of factors, including access to other sources of health care. Veterans who rely on VA health care are older and less healthy than veterans who do not, and the prevalence of costly conditions in this population is projected to increase. Potential changes to VA policy and the context for VA health care, including effects of the Affordable Care Act, could affect demand. Analysis of a range of data sources provided insight into how the veteran population is likely to change in the next decade.

  12. Current and Projected Characteristics and Unique Health Care Needs of the Patient Population Served by the Department of Veterans Affairs

    Science.gov (United States)

    Eibner, Christine; Krull, Heather; Brown, Kristine M.; Cefalu, Matthew; Mulcahy, Andrew W.; Pollard, Michael; Shetty, Kanaka; Adamson, David M.; Amaral, Ernesto F. L.; Armour, Philip; Beleche, Trinidad; Bogdan, Olena; Hastings, Jaime; Kapinos, Kandice; Kress, Amii; Mendelsohn, Joshua; Ross, Rachel; Rutter, Carolyn M.; Weinick, Robin M.; Woods, Dulani; Hosek, Susan D.; Farmer, Carrie M.

    2016-01-01

    Abstract The Veterans Access, Choice, and Accountability Act of 2014 addressed the need for access to timely, high-quality health care for veterans. Section 201 of the legislation called for an independent assessment of various aspects of veterans' health care. The RAND Corporation was tasked with an assessment of the current and projected demographics and health care needs of patients served by the Department of Veterans Affairs (VA). The number of U.S. veterans will continue to decline over the next decade, and the demographic mix and geographic locations of these veterans will change. While the number of veterans using VA health care has increased over time, demand will level off in the coming years. Veterans have more favorable economic circumstances than non-veterans, but they are also older and more likely to be diagnosed with many health conditions. Not all veterans are eligible for or use VA health care. Whether and to what extent an eligible veteran uses VA health care depends on a number of factors, including access to other sources of health care. Veterans who rely on VA health care are older and less healthy than veterans who do not, and the prevalence of costly conditions in this population is projected to increase. Potential changes to VA policy and the context for VA health care, including effects of the Affordable Care Act, could affect demand. Analysis of a range of data sources provided insight into how the veteran population is likely to change in the next decade. PMID:28083423

  13. Achievements and challenges of the World Bank Loan/Department for International Development grant-assisted Tuberculosis Control Project in China.

    Science.gov (United States)

    Kong, Peng; Jiang, Xu; Zhang, Ben; Jiang, Shi-wen; Liu, Bo

    2011-07-01

    In March 2002, the government of China launched the World Bank Loan/ Department for International Development-supported Tuberculosis (TB) Control Project to reduce the prevalence and mortality of TB. The project generated promising results in policy development, strengthening of TB control systems, patient treatment success, funds management, and the introduction of legislation. In light of the global TB epidemic and control environment, it is useful to review the TB control priorities of the project, summarize the achievements and experiences around its implementation.

  14. Washington Accelerator Conference

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    Highlights of the 1993 Particle Accelerator Conference, held in Washington in May, were picked out in the previous issue (page 18). Talks on the big hadron colliders reflected the sea-change in the accelerator world where the scale, complexity and cost of the front-line projects has slowed the pace of developments (not unlike the scene in particle physics itself). Speaking before the anti-SSC vote in the House of Representatives in June, Dick Briggs reviewed the situation at the SSC Superconducting Supercollider in Ellis County, Texas. The linac building is near completion and the Low Energy Booster will be ready to receive components early next year. Tunnelling for the Main Ring is advancing rapidly with four boring machines in action. Five miles of tunnel have been completed since January and the pace has now stepped up to nearly a mile each week. The superconducting magnet news is good. Following the successful initial string test of a half cell of the magnet lattice, a two-ring full cell with all associated services is being assembled. The mechanical robustness of the magnet design was confirmed when a dipole was taken to 9.7 T when cooled to 1.8 K. In the Magnet Test Lab itself, ten test stands are installed and equipped

  15. Washington Accelerator Conference

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1993-09-15

    Highlights of the 1993 Particle Accelerator Conference, held in Washington in May, were picked out in the previous issue (page 18). Talks on the big hadron colliders reflected the sea-change in the accelerator world where the scale, complexity and cost of the front-line projects has slowed the pace of developments (not unlike the scene in particle physics itself). Speaking before the anti-SSC vote in the House of Representatives in June, Dick Briggs reviewed the situation at the SSC Superconducting Supercollider in Ellis County, Texas. The linac building is near completion and the Low Energy Booster will be ready to receive components early next year. Tunnelling for the Main Ring is advancing rapidly with four boring machines in action. Five miles of tunnel have been completed since January and the pace has now stepped up to nearly a mile each week. The superconducting magnet news is good. Following the successful initial string test of a half cell of the magnet lattice, a two-ring full cell with all associated services is being assembled. The mechanical robustness of the magnet design was confirmed when a dipole was taken to 9.7 T when cooled to 1.8 K. In the Magnet Test Lab itself, ten test stands are installed and equipped.

  16. 40 CFR 81.348 - Washington.

    Science.gov (United States)

    2010-07-01

    ... 5/14/01 Attainment The City of Kent and a portion of the Green River valley bounded on the east and... Type Seattle-Tacoma Area: Seattle-Tacoma Urban Area (as defined by the Washington Department of Transportation urban area maps) King County (part) Attainment Pierce County (part) Attainment Snohomish County...

  17. Evaluation of the United States Department of Agriculture Northeast Area-Wide Tick Control Project by Meta-Analysis

    Science.gov (United States)

    Brei, Brandon; George, John E.; Pound, J. Mathews; Miller, J. Allen; Daniels, Thomas J.; Falco, Richard C.; Stafford, Kirby C.; Schulze, Terry L.; Mather, Thomas N.; Carroll, John F.; Fish, Durland

    2009-01-01

    Abstract As part of the Northeast Area-wide Tick Control Project (NEATCP), meta-analyses were performed using pooled data on the extent of tick-vector control achieved through seven concurrent studies, conducted within five states, using U.S. Department of Agriculture “4-Poster” devices to deliver targeted-acaricide to white-tailed deer. Although reductions in the abundance of all life-stages of Ixodes scapularis were the measured outcomes, this study focused on metrics associated with I. scapularis nymphal tick densities as this measure has consistently proven to directly correlate with human risk of acquiring Lyme disease. Since independent tick sampling schemes were undertaken at each of the five environmentally distinct study locations, a meta-analytic approach permitted estimation of a single true control-effect size for each treatment year of the NEATCP. The control-effect is expressed as the annual percent I. scapularis nymphal control most consistent with meta-analysis data for each treatment year. Our meta-analyses indicate that by the sixth treatment year, the NEATCP effectively reduced the relative density of I. scapularis nymphs by 71% on the 5.14 km2 treatment sites, corresponding to a 71% lower relative entomologic risk index for acquiring Lyme disease. PMID:19650737

  18. The Department of Boyacá on the basis of the political project of the regeneration 1886-1903. Thoughts from the political, administrative and religious views.

    Directory of Open Access Journals (Sweden)

    Claudia Liliana Monroy Hernández

    2010-07-01

    Full Text Available This article pretends to analyze the project of nation in Colombia during the period of the Regeneration, taking the specific case of the Department of Boyacá. This was a project that pretended the consolidation of a modern state through the elements of power as the religion, the education and the language, which allowed organizing a new political – administrative system of a centralistic status, in other words, that through the constitution of 1886 a social order be imposed, establishing a strong State, moved by a central government. Through these elements, it will be explained how the change from a Sovereign State of Boyacá to a Political and Administrative Department happened, which lead to a series of reforms of an economical, political and social status, that next to the transition of a secular education to a confessional education, determined the destiny of the Department from a Political Project of the Regeneration.

  19. Neah Bay, Washington Tsunami Forecast Grids for MOST Model

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Neah Bay, Washington Forecast Model Grids provides bathymetric data strictly for tsunami inundation modeling with the Method of Splitting Tsunami (MOST) model....

  20. Westport, Washington Tsunami Forecast Grids for MOST Model

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Westport, Washington Forecast Model Grids provides bathymetric data strictly for tsunami inundation modeling with the Method of Splitting Tsunami (MOST) model....

  1. Port Angeles, Washington Tsunami Forecast Grids for MOST Model

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Port Angeles, Washington Forecast Model Grids provides bathymetric data strictly for tsunami inundation modeling with the Method of Splitting Tsunami (MOST)...

  2. LiDAR (Terrain), THURSTON COUNTY, WASHINGTON, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Fugro EarthData Company furnished the collection, processing, and development of LiDAR for 825 square miles in Washington (805 square miles of Thurston County and 20...

  3. Southwestern Washington 1/3 arc-second DEM

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The 1/3-second Southwest Washington Elevation Grid provides bathymetric data in ASCII raster format of 1/3-second resolution in geographic coordinates. This grid is...

  4. Early Restoration Public Meeting, Washington, DC | NOAA Gulf Spill

    Science.gov (United States)

    benefit injured marshes, coastal dune and nearshore habitats, oysters, and human uses (on water recreation . Department of Commerce Herbert Hoover Building Auditorium 1401 Constitution Ave., NW Washington, D.C. 20230

  5. Toke Point, Washington Tsunami Forecast Grids for MOST Model

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Toke Point, Washington Forecast Model Grids provides bathymetric data strictly for tsunami inundation modeling with the Method of Splitting Tsunami (MOST) model....

  6. La Push, Washington Tsunami Forecast Grids for MOST Model

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The La Push, Washington Forecast Model Grids provides bathymetric data strictly for tsunami inundation modeling with the Method of Splitting Tsunami (MOST) model....

  7. 76 FR 58033 - Notice of Inventory Completion: Thomas Burke Memorial Washington State Museum, University of...

    Science.gov (United States)

    2011-09-19

    ... DEPARTMENT OF THE INTERIOR National Park Service [2253-665] Notice of Inventory Completion: Thomas Burke Memorial Washington State Museum, University of Washington, Seattle, WA AGENCY: National Park Service, Interior. ACTION: Notice. SUMMARY: The Thomas Burke Memorial Washington State Museum (Burke...

  8. 77 FR 46117 - Notice of Inventory Completion: Thomas Burke Memorial Washington State Museum, University of...

    Science.gov (United States)

    2012-08-02

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-WASO-NAGPRA-10823; 2200-1100-665] Notice of Inventory Completion: Thomas Burke Memorial Washington State Museum, University of Washington, Seattle, WA AGENCY: National Park Service, Interior. ACTION: Notice. SUMMARY: The Thomas Burke Memorial Washington...

  9. 78 FR 11675 - Notice of Inventory Completion: Thomas Burke Memorial Washington State Museum, University of...

    Science.gov (United States)

    2013-02-19

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-WASO-NAGPRA-12080;2200-1100-665] Notice of Inventory Completion: Thomas Burke Memorial Washington State Museum, University of Washington, Seattle, WA AGENCY: National Park Service, Interior. ACTION: Notice. SUMMARY: The Thomas Burke Memorial Washington...

  10. 75 FR 36671 - Notice of Inventory Completion: Thomas Burke Memorial Washington State Museum, University of...

    Science.gov (United States)

    2010-06-28

    ... DEPARTMENT OF THE INTERIOR National Park Service Notice of Inventory Completion: Thomas Burke Memorial Washington State Museum, University of Washington, Seattle, WA; Correction AGENCY: National Park... human remains and associated funerary objects in the possession of the Thomas Burke Memorial Washington...

  11. 76 FR 58034 - Notice of Inventory Completion: Thomas Burke Memorial Washington State Museum, University of...

    Science.gov (United States)

    2011-09-19

    ... DEPARTMENT OF THE INTERIOR National Park Service [2253-665] Notice of Inventory Completion: Thomas Burke Memorial Washington State Museum, University of Washington, Seattle, WA AGENCY: National Park Service, Interior. ACTION: Notice. SUMMARY: The Thomas Burke Memorial Washington State Museum (Burke...

  12. 76 FR 58031 - Notice of Intent To Repatriate Cultural Items: Thomas Burke Memorial Washington State Museum...

    Science.gov (United States)

    2011-09-19

    ... DEPARTMENT OF THE INTERIOR National Park Service [2253-665] Notice of Intent To Repatriate Cultural Items: Thomas Burke Memorial Washington State Museum, University of Washington, Seattle, WA AGENCY: National Park Service, Interior. ACTION: Notice. SUMMARY: The Thomas Burke Memorial Washington State Museum...

  13. 76 FR 58039 - Notice of Inventory Completion: Thomas Burke Memorial Washington State Museum, University of...

    Science.gov (United States)

    2011-09-19

    ... DEPARTMENT OF THE INTERIOR National Park Service [2253-665] Notice of Inventory Completion: Thomas Burke Memorial Washington State Museum, University of Washington, Seattle, WA AGENCY: National Park Service, Interior. ACTION: Notice. SUMMARY: The Thomas Burke Memorial Washington State Museum (Burke...

  14. 77 FR 50157 - Notice of Public Meeting, Eastern Washington Resource Advisory Council Meeting

    Science.gov (United States)

    2012-08-20

    ...; HAG 12-0260] Notice of Public Meeting, Eastern Washington Resource Advisory Council Meeting AGENCY.... Department of the Interior, Bureau of Land Management (BLM) Eastern Washington Resource Advisory Council... Bureau of Land Management's Eastern Washington and San Juan Resource Management Plan and the U.S. Forest...

  15. 77 FR 23495 - Notice of Public Meeting, Eastern Washington Resource Advisory Council Meeting

    Science.gov (United States)

    2012-04-19

    ...; HAG 12-0164] Notice of Public Meeting, Eastern Washington Resource Advisory Council Meeting AGENCY... 1972, the U.S. Department of the Interior, Bureau of Land Management (BLM) Eastern Washington Resource... of Land Management's Eastern Washington and San Juan Resource Management Plan, and the U.S. Forest...

  16. HYDRAULICS, Washington COUNTY, KENTUCKY, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Recent developments in digital terrain and geospatial database management technology make it possible to protect this investment for existing and future projects to...

  17. HYDRAULICS, WASHINGTON COUNTY, FL, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Recent developments in digital terrain and geospatial database management technology make it possible to protect this investment for existing and future projects to...

  18. Doctors of Osteopathy Licensed in Washington.

    Science.gov (United States)

    Senters, Jo

    Based on information gathered by the Health Manpower Project through a survey cosponsored with the Washington Osteopathic Medical Association, this report begins with a statement of philosophy of osteopathic medicine and proceeds to comment on where such professional education is available. Remarks on the type of educational background of the…

  19. [PACS: from project to reality. Report of experiences on full digitalisation of the radiology department of a major hospital].

    Science.gov (United States)

    Gross-Fengels, W; Miedeck, C; Siemens, P; Appel, R; Mückner, K; Finsterbusch, J; Bonas, H

    2002-02-01

    To assess the time needed and the resulting effects of a complete digitalisation of a radiological department of a major hospital (856 beds, 28,000 in-patients, 35,000 out-patients/year) a pilot study was performed. This had to be done without interrupting routine services. After intensive preparations were performed and the hospital-network was completed, within a two year period all radiological functions (mammography excluded), reporting stations and archives were changed to a complete digital workflow. All modalities (provided by 3 different companies) are now connected by DICOM-work lists. The picture-files (4 GB/day) are automatically routed to the work-stations (n = 10), where the reporting and file shows are performed, to the digital archive and to the peripheral viewing-stations (n = 44). The distribution of the digital pictures takes place all over the hospital including the ORs and special units. We accomplished, to connect electronically the report and the image data. The clinical file shows are also performed completely digitally. The access to the data of the deep archive is possible by the dept. of radiology without any manual interaction. The film consumption was reduced to an amount of less than 10%, as compared to the prior PACS situation. Since PACS has been introduced the radiological productivity increased by more than 15% and throughput-time was clearly reduced. The complete digitalisation increases productivity and attractiveness of a hospital-radiology and helps to shorten diagnostic and therapeutic decision-making. The transfer from a conventional to a digital workflow is possible without interrupting the clinical services. Extensive preparations and ongoing assistance of such projects though are clearly needed.

  20. The emergency to home project: impact of an emergency department care coordinator on hospital admission and emergency department utilization among seniors.

    Science.gov (United States)

    Bond, Christopher Matthew; Freiheit, Elizabeth A; Podruzny, Lesley; Kingsly, Alianu Akawakun; Wang, Dongmei; Davenport, Jamie; Gutscher, Abram; Askin, Cathy; Taylor, Allison; Lee, Vivian; Choo, Queenie; Lang, Eddy Samuel

    2014-01-01

    Seniors comprise 14% to 21% of all emergency department (ED) visits, yet are disproportionately larger users of ED and inpatient resources. ED care coordinators (EDCCs) target seniors at risk for functional decline and connect them to home care and other community services in hopes of avoiding hospitalization. The goal of this study was to measure the association between the presence of EDCCs and admission rates for seniors aged ≥ 65. Secondary outcomes included length of stay, recidivism at 30 days, and revisit resulting in admission at 30 days. This was a matched pairs study using administrative data from eight EDs in six Alberta cities. Four of these hospitals were intervention sites, in which patients were seen by an EDCC, while the other four sites had no EDCC presence. All seniors aged ≥ 65 with a discharge diagnosis of fall or musculoskeletal pathology were included. Cases were matched by CTAS category, age, gender, mode of arrival, and home living environment. McNemar's test for matched pairs was used to compare admission and recidivism rates at EDCC and non-EDCC hospitals. A paired t-test was used to compare length of stay between groups. There were no statistically significant differences for baseline admission rate, revisit rate at 30 days, and readmission rate at 30 days between EDCC and non-EDCC patients. This study showed no reduction in senior patients' admission rates, recidivism at 30 days, or hospital length of stay when comparing seniors seen by an EDCC with those not seen by an EDCC.

  1. Computational Fluid Dynamics Modeling of The Dalles Project: Effects of Spill Flow Distribution Between the Washington Shore and the Tailrace Spillwall

    Energy Technology Data Exchange (ETDEWEB)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.

    2010-12-01

    The U.S. Army Corps of Engineers-Portland District (CENWP) has ongoing work to improve the survival of juvenile salmonids (smolt) migrating past The Dalles Dam. As part of that effort, a spillwall was constructed to improve juvenile egress through the tailrace downstream of the stilling basin. The spillwall was designed to improve smolt survival by decreasing smolt retention time in the spillway tailrace and the exposure to predators on the spillway shelf. The spillwall guides spillway flows, and hence smolt, more quickly into the thalweg. In this study, an existing computational fluid dynamics (CFD) model was modified and used to characterize tailrace hydraulics between the new spillwall and the Washington shore for six different total river flows. The effect of spillway flow distribution was simulated for three spill patterns at the lowest total river flow. The commercial CFD solver, STAR-CD version 4.1, was used to solve the unsteady Reynolds-averaged Navier-Stokes equations together with the k-epsilon turbulence model. Free surface motion was simulated using the volume-of-fluid (VOF) technique. The model results were used in two ways. First, results graphics were provided to CENWP and regional fisheries agency representatives for use and comparison to the same flow conditions at a reduced-scale physical model. The CFD results were very similar in flow pattern to that produced by the reduced-scale physical model but these graphics provided a quantitative view of velocity distribution. During the physical model work, an additional spill pattern was tested. Subsequently, that spill pattern was also simulated in the numerical model. The CFD streamlines showed that the hydraulic conditions were likely to be beneficial to fish egress at the higher total river flows (120 kcfs and greater, uniform flow distribution). At the lowest flow case, 90 kcfs, it was necessary to use a non-uniform distribution. Of the three distributions tested, splitting the flow evenly between

  2. Assessing the Need for an On-Line Educational Module for Volunteer Leaders on Bio-Security in Washington State 4-H Livestock Projects

    Science.gov (United States)

    Stevenson, Jill L.; Moore, Dale A.; Newman, Jerry; Schmidt, Janet L.; Smith, Sarah M.; Smith, Jean; Kerr, Susan; Wallace, Michael; BoyEs, Pat

    2011-01-01

    4-H livestock projects present disease transmission risks that can be reduced by the use of bio-security practices. The responsibility of teaching bio-security to youth belongs primarily to volunteer leaders, who may not be aware of the importance of these practices. A needs assessment for an online educational module about bio-security revealed…

  3. Avian use of proposed KENETECH and CARES wind farm sites in Klickitat County, Washington. Appendix C to Washington Windplant No. 1 EIS. Technical report

    International Nuclear Information System (INIS)

    1995-01-01

    The Columbia Hills area above (north of) the Columbia River in Klickitat County, in southcentral Washington, is being considered for development of two wind power generation projects that could include the eventual placement of up to 436 wind turbines. The KENETECH Windpower Washington Windplant TM Number 1 project would include placing up to 345 KENETECH 33M-VS turbines, capable of producing up to 115 megawatts (MW), in 39 rows (strings) on a 5,110-hectare (12,630-acre) site. During scoping for these proposed developments, concerns were raised regarding the potential for avian mortality associated with wind farm development. Collision with wind turbine blade, towers, guy wires, and transmission lines, and electrocution from power lines have been identified as sources of avian mortality, particularly raptors, at existing wind farm facilities. To address these concerns, an avian study was conducted at the site in accordance with an avian study plan and protocol developed, with input from a national avian task force, state agencies (Washington Department of Fish and Wildlife [WDFW]), and federal agencies (USFWS). The study included four elements: (1) a winter raptor and waterfowl study, (2) spring migration and fall migration studies, (3) a summer resident study, and (4) a raptor breeding study. The study involved extensive field studies conducted by biologists experienced in identifying raptors and other birds

  4. Curriculum leadership in action : A tale of four community college Heads of Department leading a curriculum development project

    NARCIS (Netherlands)

    Albashiry, N.M.; Voogt, J.M.; Pieters, J.M.

    2016-01-01

    College Heads of Department (HoDs) are increasingly expected to perform more curriculum-leadership tasks, maintaining and advancing the department curriculum, especially in developing countries. However, in practice, HoDs are reported to pay little attention to this aspect of their job due to

  5. Curriculum Leadership in Action: A Tale of Four Community College Heads of Department Leading a Curriculum-Development Project

    NARCIS (Netherlands)

    Albashiry, Nabeel; Voogt, Joke; Pieters, Julius Marie

    2016-01-01

    College Heads of Department (HoDs) are increasingly expected to perform more curriculum-leadership tasks, maintaining and advancing the department curriculum, especially in developing countries. However, in practice, HoDs are reported to pay little attention to this aspect of their job due to

  6. Regional basalt hydrology of the Columbia Plateau in Washington

    International Nuclear Information System (INIS)

    Tanaka, H.; Barrett, G.; Wildrick, L.

    1979-10-01

    This study is part of the Basalt Waste Isolation Project, operated for the US Department of Energy by Rockwell Hanford Operations. The overall purpose of the study is to assess locations within the Columbia River Basalt Group beneath the Hanford Site in south-central Washington suitable for a geologic repository for radioactive waste. This hydrologic study was made to describe the hydrologic characteristics of the basalt units of the Columbia Plateau. This was done by comprehensive data compilation, data interpretation and analysis. Data are presented in the form of maps and tables suitable as input information about the regional hydrology for possible future analysis by computer models. The report includes: an introduction; basic data; interpretation which covers stratigraphic trend surface, water levels, transmissivity and storage of aquifers, recharge, discharge, flow, subbasins, cross sections, references and appendix of record of wells

  7. Involvement of the US Department of Defense in Civilian Assistance, Part I: a quantitative description of the projects funded by the Overseas Humanitarian, Disaster, and Civic Aid Program.

    Science.gov (United States)

    Bourdeaux, Margaret Ellis; Lawry, Lynn; Bonventre, Eugene V; Burkle, Frederick M

    2010-03-01

    To review the history and goals of the US Department of Defense's largest civilian assistance program, the Overseas Humanitarian, Disaster and Civic Aid Program and to describe the number, geographic regions, years, key words, countries, and types of projects carried out under this program since 2001. Using the program's central database, we reviewed all approved projects since 2001 and tabulated them by year, combatant command, country, and key word. We also reviewed the project descriptions of projects funded between January 1, 2006, and February 9, 2008, and examined how their activities varied by combatant command and year. Of the 5395 projects in the database, 2097 were funded. Projects took place in more than 90 countries, with Southern, Pacific, and Africa Command hosting the greatest number. The most common types of projects were school, health, disaster response, and water infrastructure construction, and disaster-response training. The "global war on terror" was the key word most frequently tagged to project descriptions. Project descriptions lacked stated goals as well as implementation and coordination strategies with potential partners, and did not report outcome or impact indicators. The geographic reach of the program is vast and projects take place in a wide variety of public sectors. Yet their security and civilian assistance value remains unclear given the lack of stated project goals, implementation strategies, or measures of effectiveness. To facilitate transparency and policy discussion, we recommend project proposals include hypotheses as to how they will enhance US security, their relevance to the public sector they address, and outcome and impact indicators that can assess their value and effectiveness.

  8. BPA review of Washington Public Power Supply System, Projects 1 and 3 (WNP 1 and 3), construction schedule and financing assumptions

    International Nuclear Information System (INIS)

    1984-01-01

    This document contains the following appendices: Data provided By Supply System Regarding Costs and Schedules; Basic Supply System Data and Assumptions; Detailed Modeling of Net Present Values; Origin and Detailed Description of the System Analysis Mode; Decision Analysis Model; Pro Forma Budget Expenditure Levels for Fiscal years 1984 through 1990; Financial Flexibility Analysis - Discretionary/Nondiscretionary Expenditure Levels; Detailed Analysis of BPA's Debt Structure Under the 13 Pro Forma Budget Scenarios for Fiscal Years 1984 through 1990; Wertheim and Co., Inc., August 30, 1984 Letter; Project Considerations and Licensing/Regulatory Issues, Supply System September 15, 1984 Letter; and Summary of Litigation Affecting WNP 1 and 3, and WNP 4 and 5

  9. Hyperspectral Technology Transfer to the US Department of Interior: Summary of Results of the NASA/DOI Hyperspectral Technology Transfer Project

    Science.gov (United States)

    Root, Ralph; Wickland, Diane

    2001-01-01

    In 1997 the Office of Biological Informatics and Outreach (OBIO), Biological Resources Division, US Geological Survey and NASA, Office of Earth Science (OES), initiated a coordinated effort for applying Airborne Visible and Infrared Imaging Spectrometer (AVIRIS) data and analysis, as a technology transfer project, to critical DOI environmental issues in four study sites throughout the United States. This work was accomplished by four US Department of the Interior (DOI) study teams with support from NASA/OES principal investigators and the Office of Earth Science programs. The studies, including personnel, objectives, background, project plans, and milestones were documented in a project website at . This report summarizes the final outcomes of the project, detailing accomplishments, lessons learned, and benefits realized to NASA, the US Geological Survey, and the participating DOI bureaus.

  10. Beyond the line: exploring the HRM responsibilities of line managers, project managers and the HRM department in four project-oriented companies in the Netherlands, Austria, the UK and the USA

    NARCIS (Netherlands)

    Keegan, A.; Huemann, M.; Turner, J.R.

    2012-01-01

    The topic of what human resource management (HRM) responsibilities are devolved from the HRM department to line managers has attracted much interest in recent years. We report findings from a study on the devolution of HRM practices in four project-oriented companies (POCs) and argue that although

  11. Analysis of Florida Department Of Transportation Transit Corridor Program/Projects: Technical Memorandum Number Three - General Recommendations

    Science.gov (United States)

    2001-03-01

    CUTR interviewed FDOT personnel at both the Central Office and Distict Offices and agency personnel to discuss the strengths and weaknesses of the overall Transit Corridor Program, including the results of specific projects, as well as the FDOT proce...

  12. The NASA/Baltimore Applications Project (BAP). Computer aided dispatch and communications system for the Baltimore Fire Department: A case study of urban technology application

    Science.gov (United States)

    Levine, A. L.

    1981-01-01

    An engineer and a computer expert from Goddard Space Flight Center were assigned to provide technical assistance in the design and installation of a computer assisted system for dispatching and communicating with fire department personnel and equipment in Baltimore City. Primary contributions were in decision making and management processes. The project is analyzed from four perspectives: (1) fire service; (2) technology transfer; (3) public administration; and (5) innovation. The city benefitted substantially from the approach and competence of the NASA personnel. Given the proper conditions, there are distinct advantages in having a nearby Federal laboratory provide assistance to a city on a continuing basis, as is done in the Baltimore Applications Project.

  13. Progress and Lessons Learned in Transuranic Waste Disposition at The Department of Energy's Advanced Mixed Waste Treatment Project

    Energy Technology Data Exchange (ETDEWEB)

    J.D. Mousseau; S.C. Raish; F.M. Russo

    2006-05-18

    This paper provides an overview of the Department of Energy's (DOE) Advanced Mixed Waste Treatment Project (AMWTP) located at the Idaho National Laboratory (INL) and operated by Bechtel BWXT Idaho, LLC(BBWI) It describes the results to date in meeting the 6,000-cubic-meter Idaho Settlement Agreement milestone that was due December 31, 2005. The paper further describes lessons that have been learned from the project in the area of transuranic (TRU) waste processing and waste certification. Information contained within this paper would be beneficial to others who manage TRU waste for disposal at the Waste Isolation Pilot Plant (WIPP).

  14. Proposed Plan for an amendment to the Environmental Restoration Disposal Facility Record of Decision, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1997-07-01

    The U.S. Environmental Protection Agency, the Washington State Department of Ecology, and the U.S. Department of Energy (Tri- Parties) are proposing an amendment to the Environmental Restoration Disposal Facility Record of Decision (ERDF ROD). EPA is the lead regulatory agency for the ERDF Project. This Proposed Plan includes two elements intended to promote Hanford Site cleanup activities by broadening utilization and operation of ERDF as follows: (1) Construct the planned Phase II of ERDF using the current disposal cell design and (2) enable centralized treatment of remediation waste at ERDF prior to disposal, as appropriate

  15. A stakeholder project to model water temperature under future climate scenarios in the Satus and Toppenish watersheds of the Yakima River Basinin Washington, USA

    Science.gov (United States)

    Graves, D.; Maule, A.

    2014-01-01

    The goal of this study was to support an assessment of the potential effects of climate change on select natural, social, and economic resources in the Yakima River Basin. A workshop with local stakeholders highlighted the usefulness of projecting climate change impacts on anadromous steelhead (Oncorhynchus mykiss), a fish species of importance to local tribes, fisherman, and conservationists. Stream temperature is an important environmental variable for the freshwater stages of steelhead. For this study, we developed water temperature models for the Satus and Toppenish watersheds, two of the key stronghold areas for steelhead in the Yakima River Basin. We constructed the models with the Stream Network Temperature Model (SNTEMP), a mechanistic approach to simulate water temperature in a stream network. The models were calibrated over the April 15, 2008 to September 30, 2008 period and validated over the April 15, 2009 to September 30, 2009 period using historic measurements of stream temperature and discharge provided by the Yakama Nation Fisheries Resource Management Program. Once validated, the models were run to simulate conditions during the spring and summer seasons over a baseline period (1981–2005) and two future climate scenarios with increased air temperature of 1°C and 2°C. The models simulated daily mean and maximum water temperatures at sites throughout the two watersheds under the baseline and future climate scenarios.

  16. Recent developments: Washington focus

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    November was a quiet month in Washington. Although Congress has recessed until 1991, the Senate filled vacancies in party leadership positions created by November's elections. The House is expected to proceed with its changes in early December. The Nuclear Energy Forum was held in Washington, DC on November 11-14 to discuss the status of the nuclear industry in the USA. The Forum, held in conjunction with the American Nuclear Society's annual meeting, assembled a large number of CEO's from US, European, and Far Eastern utilities and vendors. The meeting concluded with an announcement by Philip Bayne, President of NYPA and chairman of the Nuclear Power Oversight Committee (NPOC), of the results of a year-long NPOC study entitled a open-quotes Strategic Plan for Building New Nuclear Power Plants.close quotes

  17. Fuel management at Washington State Ferries

    International Nuclear Information System (INIS)

    Brodeur, P.; Olds, J.

    2008-01-01

    This presentation discussed Washington State Ferry (WSF) operations and provided details of a biodiesel research and demonstration project. Washington has the largest ferry system in the United States, with a total of 28 vessels that operate on 10 routes through 20 terminals. Routes vary by transit times, navigational challenges, and the proximity to population centres. WSF fuel and emissions management initiatives include exhaust emission studies, clean fuel initiatives, machinery upgrades, fuel conservation initiatives, and biodiesel testing. The organization is also using waste heat recovery and a positive restraint system. The WSF biodiesel pilot program was conducted using soy-derived fuels with a purifier disk stack. The program is in agreement with recent legislation requiring that 2 per cent of annual diesel fuel sales are from biodiesel fuels, and state legislation requiring that state agencies use a minimum of 20 per cent biodiesel blends in diesel-powered vessels and vehicles. Details of project partnerships were included. tabs., figs

  18. Issues related to uncertainty in projections of hazardous and mixed waste volumes in the U.S. Department of Energy's environmental restoration program

    International Nuclear Information System (INIS)

    Picel, K.C.

    1995-01-01

    Projected volumes of contaminated media and debris at US Department of Energy (DOE) environmental restoration sites that are potentially subject to the hazardous waste provisions of the Resource Conservation and Recovery Act are needed to support programmatic planning. Such projections have been gathered in various surveys conducted under DOE's environmental restoration and waste management programs. It is expected that reducing uncertainty in the projections through review of existing site data and process knowledge and through further site characterization will result in substantially lowered projections. If promulgated, the US Environmental Protection Agency's Hazardous Waste Identification Rule would result in potentially even greater reductions in the projections when site conditions are reviewed under the provisions of the new rule. Reducing uncertainty in projections under current and future waste identification rules may be necessary to support effective remediation planning. Further characterization efforts that may be conducted should be designed to limit uncertainty in identifying volumes of wastes to the extent needed to support alternative selection and to minimize costs of remediation

  19. Fusion Simulation Project. Workshop Sponsored by the U.S. Department of Energy, Rockville, MD, May 16-18, 2007

    Energy Technology Data Exchange (ETDEWEB)

    Kritz, A.; Keyes, D.

    2007-05-18

    The mission of the Fusion Simulation Project is to develop a predictive capability for the integrated modeling of magnetically confined plasmas. This FSP report adds to the previous activities that defined an approach to integrated modeling in magnetic fusion. These previous activities included a Fusion Energy Sciences Advisory Committee panel that was charged to study integrated simulation in 2002. The report of that panel [Journal of Fusion Energy 20, 135 (2001)] recommended the prompt initiation of a Fusion Simulation Project. In 2003, the Office of Fusion Energy Sciences formed a steering committee that developed a project vision, roadmap, and governance concepts [Journal of Fusion Energy 23, 1 (2004)]. The current FSP planning effort involved forty-six physicists, applied mathematicians and computer scientists, from twenty-one institutions, formed into four panels and a coordinating committee. These panels were constituted to consider: Status of Physics Components, Required Computational and Applied Mathematics Tools, Integration and Management of Code Components, and Project Structure and Management. The ideas, reported here, are the products of these panels, working together over several months and culminating in a three-day workshop in May 2007.

  20. Fusion Simulation Project. Workshop sponsored by the U.S. Department of Energy Rockville, MD, May 16-18, 2007

    Energy Technology Data Exchange (ETDEWEB)

    None

    2007-05-16

    The mission of the Fusion Simulation Project is to develop a predictive capability for the integrated modeling of magnetically confined plasmas. This FSP report adds to the previous activities that defined an approach to integrated modeling in magnetic fusion. These previous activities included a Fusion Energy Sciences Advisory Committee panel that was charged to study integrated simulation in 2002. The report of that panel [Journal of Fusion Energy 20, 135 (2001)] recommended the prompt initiation of a Fusion Simulation Project. In 2003, the Office of Fusion Energy Sciences formed a steering committee that developed a project vision, roadmap, and governance concepts [Journal of Fusion Energy 23, 1 (2004)]. The current FSP planning effort involved forty-six physicists, applied mathematicians and computer scientists, from twenty-one institutions, formed into four panels and a coordinating committee. These panels were constituted to consider: Status of Physics Components, Required Computational and Applied Mathematics Tools, Integration and Management of Code Components, and Project Structure and Management. The ideas, reported here, are the products of these panels, working together over several months and culminating in a three-day workshop in May 2007.

  1. Fusion Simulation Project. Workshop sponsored by the U.S. Department of Energy Rockville, MD, May 16-18, 2007

    International Nuclear Information System (INIS)

    2007-01-01

    The mission of the Fusion Simulation Project is to develop a predictive capability for the integrated modeling of magnetically confined plasmas. This FSP report adds to the previous activities that defined an approach to integrated modeling in magnetic fusion. These previous activities included a Fusion Energy Sciences Advisory Committee panel that was charged to study integrated simulation in 2002. The report of that panel (Journal of Fusion Energy 20, 135 (2001)) recommended the prompt initiation of a Fusion Simulation Project. In 2003, the Office of Fusion Energy Sciences formed a steering committee that developed a project vision, roadmap, and governance concepts (Journal of Fusion Energy 23, 1 (2004)). The current FSP planning effort involved forty-six physicists, applied mathematicians and computer scientists, from twenty-one institutions, formed into four panels and a coordinating committee. These panels were constituted to consider: Status of Physics Components, Required Computational and Applied Mathematics Tools, Integration and Management of Code Components, and Project Structure and Management. The ideas, reported here, are the products of these panels, working together over several months and culminating in a three-day workshop in May 2007.

  2. Fusion Simulation Project. Workshop Sponsored by the U.S. Department of Energy, Rockville, MD, May 16-18, 2007

    International Nuclear Information System (INIS)

    Kritz, A.; Keyes, D.

    2007-01-01

    The mission of the Fusion Simulation Project is to develop a predictive capability for the integrated modeling of magnetically confined plasmas. This FSP report adds to the previous activities that defined an approach to integrated modeling in magnetic fusion. These previous activities included a Fusion Energy Sciences Advisory Committee panel that was charged to study integrated simulation in 2002. The report of that panel [Journal of Fusion Energy 20, 135 (2001)] recommended the prompt initiation of a Fusion Simulation Project. In 2003, the Office of Fusion Energy Sciences formed a steering committee that developed a project vision, roadmap, and governance concepts [Journal of Fusion Energy 23, 1 (2004)]. The current FSP planning effort involved forty-six physicists, applied mathematicians and computer scientists, from twenty-one institutions, formed into four panels and a coordinating committee. These panels were constituted to consider: Status of Physics Components, Required Computational and Applied Mathematics Tools, Integration and Management of Code Components, and Project Structure and Management. The ideas, reported here, are the products of these panels, working together over several months and culminating in a three-day workshop in May 2007

  3. Integrating the NEPA 216 process with large-scale privatization projects under the US Department of Energy

    International Nuclear Information System (INIS)

    Eccleston, C.H.

    1994-05-01

    The US Department of Energy (DOE) is considering the possibility of replacing the existing Hanford Site 200 Are steam system through a privatization effort. Such an action would be subject to requirements of the National Environmental Policy Act (NEPA) of 1969. Section 216 of the Doe NEPA Implementation Procedures (216 Process) provides a specific mechanism for integrating the DOE procurement process with NEPA compliance requirements

  4. Missouri Department of Natural Resources Hazardous Waste Program Weldon Spring site remedial action project. Status of project to date January 1996

    International Nuclear Information System (INIS)

    1998-01-01

    This document describes the progress made by the Missouri Department of Natural Resources during the third year (1995) of the Agreement in Support (AIS) in its oversight role at the Weldon Springs Site. The accomplishments this year include participation in several workgroup meetings, oversight of the two operable units (Groundwater and Quarry Residuals), coordination between the US DOE and the various regulatory programs, and continued independent analysis of the treated water discharges

  5. Snag Dynamics in Western Oregon and Washington

    OpenAIRE

    Ohmann, Janet L

    2002-01-01

    To achieve desired amounts and characteristics of snags and down wood, managers require analytical tools for projecting changes in dead wood over time, and for comparing those changes to management objectives such as providing dead wood for wildlife and ecosystem processes. The following information on rates of snag recruitment, decay, and fall across forests of western Oregon and Washington may be useful in planning for future levels of dead wood. Eventually the information will be incorpora...

  6. Café seminars in a bottom-up organizational development project at a Danish radiology department

    DEFF Research Database (Denmark)

    Niss, Karsten Ulrik

    2010-01-01

    Participatory design includes engaging in large-scale information-systems development where participatory design approaches have been applied throughout design and organizational implementation. The keynote suggest to extend the iterative prototyping approach by (1) emphasizing participatory design...... and development into a sustained and ongoing implementation that constitutes an overall technology-driven organizational change. This sustained participatory design and implementation approach is exemplified through a large-scale project in the Danish healthcare sector...

  7. The 1980-1982 Geothermal Resource Assessment Program in Washington

    Energy Technology Data Exchange (ETDEWEB)

    Korosec, Michael A.; Phillips, William M.; Schuster, J.Eric

    1983-08-01

    Since 1978, the Division of Geology and Earth Resources of the Washington Department of Natural Resources has participated in the U.S. Department of Energy's (USDOE) State-Coupled Geothermal Resource Program. Federal and state funds have been used to investigate and evaluate the potential for geothermal resources, on both a reconnaissance and area-specific level. Preliminary results and progress reports for the period up through mid-1980 have already been released as a Division Open File Report (Korosec, Schuster, and others, 1981). Preliminary results and progress summaries of work carried out from mid-1980 through the end of 1982 are presented in this report. Only one other summary report dealing with geothermal resource investigations in the state has been published. An Information Circular released by the Division (Schuster and others, 1978) compiled the geology, geochemistry, and heat flow drilling results from a project in the Indian Heaven area in the south Cascades. The previous progress report for the geothermal program (Korosec, Schuster, and others, 1981) included information on temperature gradients measured throughout the state, heat flow drilling in the southern Cascades, gravity surveys for the southern Cascades, thermal and mineral spring investigations, geologic mapping for the White Pass-Tumac Mountain area, and area specific studies for the Camas area of Clark County and Mount St. Helens. This work, along with some additional studies, led to the compilation of the Geothermal Resources of Washington map (Korosec, Kaler, and others, 1981). The map is principally a nontechnical presentation based on all available geothermal information, presented as data points, tables, and text on a map with a scale of 1:500,000.

  8. Production of strontium-82 for the Cardiogen trademark PET generator: a project of the Department of Energy Virtual Isotope Center

    International Nuclear Information System (INIS)

    Phillips, D.R.; Peterson, E.J.; Taylor, W.A.; Jamriska, D.J.; Hamilton, V.T.; Kitten, J.J.; Valdez, F.O.; Salazar, L.L.; Pitt, L.R.; Heaton, R.C.; Kolsky, K.L.; Mausner, L.F.; Kurczak, S.; Zhuikov, B.L.; Kokhanyuk, V.M.; Konyakhin, N.A.; Nortier, F.M.; Walt, T.N. van der; Hanekom, J.; Sosnowski, K.M.; Carty, J.S.

    2000-01-01

    In December of 1989, the United States Food and Drug Administration approved 82 Rb chloride in saline solution for cardiological perfusion imaging by positron emission tomography (PET). The solution is derived from a 82 Sr generator system that is presently manufactured by Bristol Myers Squibb and distributed for clinical application in the United States by Bracco Diagnostics, Inc. Many years of research and development by people in several institutions led up to the approval for clinical use. Currently, there are about 15 sites in the U.S. that perform clinical myocardial perfusion imaging by PET using 82 Rb chloride from the generator. In order to manufacture the generators, Bristol Myers Squibb requires about 1600 mCi of 82 Sr every 30 days. The United States Department of Energy and MDS Nordion, Canada are the current suppliers with qualified Drug Master Files for the production and distribution of this nuclide for the Cardiogen trademark generator. These two entities have worked together over the years to assure the regular, reliable supply of the 82 Sr. Here we describe the facilities and methods used by the Department of Energy in its Virtual Isotope Center to make and distribute the nuclide. (orig.)

  9. Lower Columbia River Terminal Fisheries Research Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-04-01

    This notice announces BPA`S`s decision to fund the Oregon Department of Fish and Wildlife (ODFW), the Washington Department of Fish and Wildlife (WDFW), and the Clatsop Economic Development Committee for the Lower Columbia River Terminal Fisheries Research Project (Project). The Project will continue the testing of various species/stocks, rearing regimes, and harvest options for terminal fisheries, as a means to increase lower river sport and commercial harvest of hatchery fish, while providing both greater protection of weaker wild stocks and increasing the return of upriver salmon runs to potential Zone 6 Treaty fisheries. The Project involves relocating hatchery smolts to new, additional pen locations in three bays/sloughs in the lower Columbia River along both the Oregon and Washington sides. The sites are Blind Slough and Tongue Point in Clatsop County, Oregon, and Grays Bay/Deep River, Wahkiakum County, Washington. The smolts will be acclimated for various lengths of time in the net pens and released from these sites. The Project will expand upon an existing terminal fisheries project in Youngs Bay, Oregon. The Project may be expanded to other sites in the future, depending on the results of this initial expansion. BPA`S has determined the project is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required, and BPA`S is issuing this FONSI.

  10. Implementation of the best in class project management and contract management initiative at the Department Of Energy's Office Of Environmental Management - 16062

    International Nuclear Information System (INIS)

    Van Camp, Scott G.; Stevenson, Jeremy S.; Deiters, Michael G.; Jamison, Timothy P.

    2009-01-01

    Since its creation in 1989, the Department of Energy (DOE), Office of Environmental Management (EM) has struggled with a legacy of inadequate project management and contract management. This has been manifested in recurring scope changes, cost overruns and schedule delays, and has been documented in multiple internal and external reviews. EM has committed itself to improving project performance and undertaken a number of proactive management initiatives including the development of a 'Best in Class' Project Management and Contract Management organization (i.e., the BICPM Initiative). During 2007, EM assessed the status of project management and contract management at 15 EM sites. These assessments evaluated strengths and weaknesses in 12 key project management capabilities and three contract management benchmarks. The January 2008 Compilation Assessment Report showed that EM faces significant challenges in its mission execution due to staffing shortages, project and contract management integration, insufficient project-oriented culture, and lack of a clear role for Headquarters in BICPM. EM then formulated a strategy to meet their objectives in the March 2008 Corporate Implementation Plan. It summarizes BICPM efforts, introduces the vision for BICPM, identifies the strategy for achieving BICPM, and describes a process for implementing BICPM. That is, it acts as a road-map to address EM's challenges. It also documents 18 Recommended Priority Actions (RPAs) that are the key to correcting these challenges. These RPAs provide a clear path forward that can be communicated to the entire EM organization and provide the foundation upon which a BICPM culture can be built. EM has since gained considerable momentum and progress towards institutionalizing BICPM. This paper provides a discussion of the BICPM Initiative and its implementation. (authors)

  11. Ukraine - USA partnership for peace. AEMS project on development and improving of 'Defense' automated emergency management system of the Civil Defense Department of Ukraine

    International Nuclear Information System (INIS)

    1998-01-01

    AEMS project is destined for the development and improving of 'Defense' system of the Civil Defense Department of Ukraine. 'Defense' system is destined for prevention and operation prognosis of emergencies of technological and natural character on the territory of Ukraine as well as for the elaboration of the solutions on protection and rescue of the population and national economy resources. The data are processed at national, regional, district and town levels. By the results of task solutions possible losses of human and material resources as well as necessary forces and means for removal of these consequences are defined. (R.P.)

  12. Technical highlights of the availability and entry projects of the U.S. Department of Energy's Radon Research Program

    International Nuclear Information System (INIS)

    Tanner, A.B.; Olsen, C.R.

    1992-01-01

    Projects concerned with 226 Rn and 222 Rn occurrence have found that: (1) severe indoor 222 Rn concentrations are associated with U-bearing shear zones; (2) surface γ ray surveys correlate with 222 Rn in soil gas; (3) sorption is important in dry soils and some building materials; (4) organically bound 226 Ra can be the principal source of 222 Rn in soil gas; and (5) passive detectors may seriously underestimate 222 Rn concentrations in the ground. Correlations enable reasonable prediction of Rn diffusion coefficient and soil permeability changes with changing soil moisture. Instrumental test structures permit monitoring the effects of important environmental variables on Rn entry. Multidimensional numerical models are being used to account for soil moisture, absorption, adsorption, diffusion and advection in Rn transport towards buildings. Other numerical models predict 222 Rn entry on the basis of 226 Rn concentration, emanation coefficient, and soil permeability, and show that the pressure gradients decrease sharply with distance from the entry cracks. (author)

  13. Department of Physics' Involvement of the Impact Testing Project of the High Speed Civil Transport Program (HSCT)

    Science.gov (United States)

    VonMeerwall, Ernst D.

    1994-01-01

    The project involved the impact testing of a kevlar-like woven polymer material, PBO. The purpose was to determine whether this material showed any promise as a lightweight replacement material for jet engine fan containment. The currently used metal fan containment designs carry a high drag penalty due to their weight. Projectiles were fired at samples of PBO by means of a 0.5 inch diameter Helium powered gun. The Initial plan was to encase the samples inside a purpose-built steel "hot box" for heating and ricochet containment. The research associate's responsibility was to develop the data acquisition programs and techniques necessary to determine accurately the impacting projectile's velocity. Beyond this, the Research Associate's duties include any physical computations, experimental design, and data analysis necessary.

  14. Beyond Rehabilitation: The Federal City College Lorton Project--A Model Prison Higher Education Program

    Science.gov (United States)

    Taylor, Andress

    1974-01-01

    A description and evaluation of the Federal City College (the first Urban Land Grant institution in the nation) higher education program offered in association with a group of Washington, D.C., penal institutions located in Lorton, Virginia. This Lorton Project has been adopted as a National Model by the Department of Health, Education, and…

  15. Annual report on the U.S. Department of Energy's Cultural Resource Activities at Colorado UMTRA Project Sites for October 1993 through September 1994

    International Nuclear Information System (INIS)

    1994-11-01

    This report summarizes the results of cultural resource activities conducted by the U.S. Department of Energy (DOE) at Uranium Mill Tailings Remedial Action (UMTRA) Project sites in Colorado for the period of October 1, 1993, through September 30, 1994. The UMTRA Project is a cooperative (state and federal) program mandated by the Uranium Mill Tailings Radiation Control Act, Public Law 95-604 (42 USC section 7901 et seq.). This law requires the timely cleanup of 24 inactive uranium mill tailings sites throughout the United States. Nine of these inactive uranium mill tailings sites are in Colorado at Durango, Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock. On December 6, 1984, the DOE, Advisory Council on Historic Preservation, and Colorado State Historic Preservation Officer (SHPO) entered into a programmatic memorandum of agreement (PMOA) (DOE, 1984). This PMOA specifies requirements for the DOE's fulfillment of its obligations under various state and federal regulations for the protection and preservation of cultural resources. This report fulfills the requirement for the DOE to provide the state of Colorado with an annual report on the cultural resource activities performed for all of the UMTRA Project sites in Colorado. This report is organized by UMTRA Project site. For each site, the general remedial action activities and cultural resource activities performed during the period of record are summarized. When known, the DOE's plans for future cultural resource activities at the site are summarized

  16. An international peer review of the biosphere modelling programme of the US Department of Energy's Yucca mountain site characterization project. Report of the IAEA International Review Team

    International Nuclear Information System (INIS)

    2001-04-01

    The United States Department of Energy (DOE) has a project for characterizing the site of a facility for disposing of radioactive waste located at Yucca Mountain Nevada, USA (the Yucca Mountain Site Characterization Project). This Project has developed an approach for assessing the future potential impact of any releases of radionuclides to the biosphere from a potential disposal facility sited at Yucca Mountain The DOE requested the International Atomic Energy Agency (IAEA) to organize an independent international expert review of the assessment methodology being used in its biosphere modelling programme. The IAEA accepted the request in the context of its statutory obligation to provide for the application of its established international standards of safety for the protection of health, at the request of a State, to any of that State's activities in the field of atomic energy. The terms of reference of the peer review were to review the biosphere assessment methodology being used for the total system performance assessment of the potential disposal facility. The main purpose was to analyze critically the proposed rationale and methodology and to identify consistencies and inconsistencies between methods being used in the frame of the Project and those established in international standards or in international programmes such as the IAEA's Biosphere Modelling and Assessment Programme (BIOMASS). This report presents the consensus view of the international experts convened by the IAEA for carrying out the review

  17. Washington State Biofuels Industry Development

    Energy Technology Data Exchange (ETDEWEB)

    Gustafson, Richard [Univ. of Washington, Seattle, WA (United States)

    2017-04-09

    The funding from this research grant enabled us to design, renovate, and equip laboratories to support University of Washington biofuels research program. The research that is being done with the equipment from this grant will facilitate the establishment of a biofuels industry in the Pacific Northwest and enable the University of Washington to launch a substantial biofuels and bio-based product research program.

  18. Annual report on the U.S. Department of Energy's cultural resource activities at Colorado UMTRA Project sites for October 1995--September 1996

    International Nuclear Information System (INIS)

    1996-09-01

    This report summarizes the results of cultural resource activities conducted by the U.S. Department of Energy (DOE) at Uranium Mill Tailings Remedial Action (UMTRA) Project sites in Colorado for the period of October 1, 1995 through September 30, 1996. The inactive uranium mill tailings sites in Colorado are at Durango, Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock. On December 6, 1984, the DOE, the Advisory Council on Historic Preservation, and the Colorado State Historic Preservation Officer (SHPO) entered into a programmatic memorandum of understanding (PMOU). This PMOU requires the DOE to fulfillment of its obligations under various state and federal regulations for the protection and preservation of cultural resources. This report provides the state of Colorado with an annual report on the cultural resource activities performed for all UMTRA Project sites in Colorado. Due to the completion of surface activities at the UMTRA Project sites, this will be the last annual report to the state of Colorado. Cultural resources activities subsequent to this report will be reported to the state through site-specific correspondence

  19. Effluent monitoring Quality Assurance Project Plan for radioactive airborne emissions data. Revision 2

    International Nuclear Information System (INIS)

    Frazier, T.P.

    1995-12-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for compiling Hanford Site radioactive airborne emissions data. These data will be reported to the U.S. Environmental Protection Agency, the US Department of Energy, and the Washington State Department of Health. Effluent Monitoring performs compliance assessments on radioactive airborne sampling and monitoring systems. This Quality Assurance Project Plan is prepared in compliance with interim guidelines and specifications. Topics include: project description; project organization and management; quality assurance objectives; sampling procedures; sample custody; calibration procedures; analytical procedures; monitoring and reporting criteria; data reduction, verification, and reporting; internal quality control; performance and system audits; corrective actions; and quality assurance reports

  20. 78 FR 74163 - Harrison Medical Center, a Subsidiary of Franciscan Health System Bremerton, Washington; Notice...

    Science.gov (United States)

    2013-12-10

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-83,070] Harrison Medical Center, a Subsidiary of Franciscan Health System Bremerton, Washington; Notice of Negative Determination... workers of Harrison Medical Center, a subsidiary of Franciscan Health System, Bremerton, Washington...

  1. 78 FR 45958 - Notice of Inventory Completion: Thomas Burke Memorial Washington State Museum, University of...

    Science.gov (United States)

    2013-07-30

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-WASO-NAGPRA-13406; PPWOCRADN0-PCU00RP14.R50000] Notice of Inventory Completion: Thomas Burke Memorial Washington State Museum, University of Washington, Seattle, WA AGENCY: National Park Service, Interior. ACTION: Notice. SUMMARY: The Thomas Burke...

  2. 78 FR 59963 - Notice of Inventory Completion: Thomas Burke Memorial Washington State Museum, University of...

    Science.gov (United States)

    2013-09-30

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-WASO-NAGPRA-13770; PPWOCRADN0-PCU00RP14.R50000] Notice of Inventory Completion: Thomas Burke Memorial Washington State Museum, University of..., Interior. ACTION: Notice. SUMMARY: The Thomas Burke Memorial Washington State Museum, University of...

  3. 78 FR 44595 - Notice of Inventory Completion: Thomas Burke Memorial Washington State Museum, University of...

    Science.gov (United States)

    2013-07-24

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-WASO-NAGPRA-13407; PPWOCRADN0-PCU00RP14.R50000] Notice of Inventory Completion: Thomas Burke Memorial Washington State Museum, University of Washington, Seattle, WA AGENCY: National Park Service, Interior. ACTION: Notice. SUMMARY: The Thomas Burke...

  4. 78 FR 17229 - Notice of Public Meeting, Eastern Washington Resource Advisory Council

    Science.gov (United States)

    2013-03-20

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLORW00000 L102000000.ML0000 13XL1109AF.HAG13-0139] Notice of Public Meeting, Eastern Washington Resource Advisory Council AGENCY: Bureau of... the Eastern Washington Resource Advisory Council. The meeting on March 21, 2013, has been cancelled...

  5. The power professorship program at Washington State University

    International Nuclear Information System (INIS)

    Mosher, C.C.; Shamash, Y.

    1993-01-01

    As with most electric power programs, Washington State University's has existed since the beginning of the engineering program 100 years ago. It has grown and developed largely through the efforts of a few dedicated individuals. The Power Professorship Program has existed since 1972. The Power Professor has been Dr. Clifford C. Mosher until his recent semi-retirement. The Power Professorship was conceived of as an avenue for joint university-industry interaction. Considerable time and ingenuity by visionary engineers and others have resulted in development of a financial base for the Power Professorship Program. The program has been funded equally by public and investor-utility sectors. Following financial difficulties stemming from the Washington Public Power Supply System financial default on public utility bonds for several nuclear projects, funding for the program from the public sector was canceled. After several lean years, public-sector support was again restored by WSU's electrical engineering department offering a contract for services to the utilities in exchange for funding. This contract has been renewed annually, with costs and benefits firmly established through careful analysis and consultation. Problems facing the power industry in the early 1970s with regard to establishing a pipeline of future human resources, were almost identical with those of the present time: indifferent feelings about the industry in general, students being attracted to more glamorous disciplines, and a decline in educational opportunities available in the power area. A 1985 article in the IEEE Power Engineering Review describing today's declining enrollment in power engineering applies equally well to previous periods. A major driving force for initiating utility-industry participation in the Power Professorship Program was the concern for maintaining a source of entry-level engineers with a background in power engineering

  6. The Use of Economic Evaluation to Inform Newborn Screening Policy Decisions: The Washington State Experience.

    Science.gov (United States)

    Grosse, Scott D; Thompson, John D; Ding, Yao; Glass, Michael

    2016-06-01

    Newborn screening not only saves lives but can also yield net societal economic benefit, in addition to benefits such as improved quality of life to affected individuals and families. Calculations of net economic benefit from newborn screening include the monetary equivalent of avoided deaths and reductions in costs of care for complications associated with late-diagnosed individuals minus the additional costs of screening, diagnosis, and treatment associated with prompt diagnosis. Since 2001 the Washington State Department of Health has successfully implemented an approach to conducting evidence-based economic evaluations of disorders proposed for addition to the state-mandated newborn screening panel. Economic evaluations can inform policy decisions on the expansion of newborn screening panels. This article documents the use of cost-benefit models in Washington State as part of the rule-making process that resulted in the implementation of screening for medium-chain acyl-CoA dehydrogenase (MCAD) deficiency and 4 other metabolic disorders in 2004, cystic fibrosis (CF) in 2006, 15 other metabolic disorders in 2008, and severe combined immune deficiency (SCID) in 2014. We reviewed Washington State Department of Health internal reports and spreadsheet models of expected net societal benefit of adding disorders to the state newborn screening panel. We summarize the assumptions and findings for 2 models (MCAD and CF) and discuss them in relation to findings in the peer-reviewed literature. The MCAD model projected a benefit-cost ratio of 3.4 to 1 based on assumptions of a 20.0 percentage point reduction in infant mortality and a 13.9 percentage point reduction in serious developmental disability. The CF model projected a benefit-cost ratio of 4.0-5.4 to 1 for a discount rate of 3%-4% and a plausible range of 1-2 percentage point reductions in deaths up to age 10 years. The Washington State cost-benefit models of newborn screening were broadly consistent with peer

  7. The Quebec Rural Emergency Department Project: A Cross-Sectional Study of a Potential Two-Pronged Strategy in the Knowledge Transfer Process

    Science.gov (United States)

    Poitras, Julien; Chauny, Jean-Marc; Lévesque, Jean-Frédéric; Ouimet, Mathieu; Dupuis, Gilles; Tanguay, Alain; Simard-Racine, Geneviève

    2015-01-01

    Introduction Health services research generates useful knowledge. Promotion of implementation of this knowledge in medical practice is essential. Prior to initiation of a major study on rural emergency departments (EDs), we deployed two knowledge transfer strategies designed to generate interest and engagement from potential knowledge users. The objective of this paper was to review: 1) a combined project launch and media press release strategy, and 2) a pre-study survey designed to survey potential knowledge users’ opinions on the proposed study variables. Materials and Methods We evaluated the impact of the project launch (presentation at two conferences hosted by key stakeholders) and media press release via a survey of participants/stakeholders and by calculating the number of media interview requests and reports generated. We used a pre-study survey to collect potential key stakeholder’ opinions on the study variables. Results Twenty-one of Quebec’s 26 rural EDs participated in the pre-study survey (81% participation rate). The press release about the study generated 51 press articles and 20 media request for interviews, and contributed to public awareness of a major rural research initiative. In the pre-study survey, thirteen participants (46%) mentioned prior knowledge of the research project. Results from the pre-study survey revealed that all of the potential study variables were considered to be relevant for inclusion in the research project. Respondents also proposed additional variables of interest, including factors promoting retention of human resources. Conclusions The present study demonstrated the potential utility of a two-pronged knowledge transfer strategy, including a combined formal launch and press release, and a pre-study survey designed to ensure that the included variables were of interest to participants and stakeholders. PMID:25849328

  8. The Quebec rural emergency department project: a cross-sectional study of a potential two-pronged strategy in the knowledge transfer process.

    Directory of Open Access Journals (Sweden)

    Mélodie-Anne Drouin

    Full Text Available Health services research generates useful knowledge. Promotion of implementation of this knowledge in medical practice is essential. Prior to initiation of a major study on rural emergency departments (EDs, we deployed two knowledge transfer strategies designed to generate interest and engagement from potential knowledge users. The objective of this paper was to review: 1 a combined project launch and media press release strategy, and 2 a pre-study survey designed to survey potential knowledge users' opinions on the proposed study variables.We evaluated the impact of the project launch (presentation at two conferences hosted by key stakeholders and media press release via a survey of participants/stakeholders and by calculating the number of media interview requests and reports generated. We used a pre-study survey to collect potential key stakeholder' opinions on the study variables.Twenty-one of Quebec's 26 rural EDs participated in the pre-study survey (81% participation rate. The press release about the study generated 51 press articles and 20 media request for interviews, and contributed to public awareness of a major rural research initiative. In the pre-study survey, thirteen participants (46% mentioned prior knowledge of the research project. Results from the pre-study survey revealed that all of the potential study variables were considered to be relevant for inclusion in the research project. Respondents also proposed additional variables of interest, including factors promoting retention of human resources.The present study demonstrated the potential utility of a two-pronged knowledge transfer strategy, including a combined formal launch and press release, and a pre-study survey designed to ensure that the included variables were of interest to participants and stakeholders.

  9. Research-retreat-recovery: A potential model for organization and completion of research projects. Experience from a neurosurgery department in a developing country.

    Science.gov (United States)

    Godil, Saniya Siraj; Kazim, Syed Faraz; Shamim, Muhammad Shahzad

    2010-10-30

    In the current era of biomedical research, it is imperative that every research study at an institution is properly organized, and frequently audited to streamline efforts and maintain standards. Recently, a research retreat was organized by the Section of Neurosurgery at Aga Khan University Hospital, Karachi, Pakistan, and following that a recovery team was made with the aim of recovering "lost in translation" research projects. In the realm of our experience, the current model is being proposed as a means for organization of departmental research. The "research" component of the model comprised compilation of an abstract book of all research work done within the section during the last five years. The "retreat" component of the model was intended with objectives of analysis of past research and generation of fresh ideas. The "recovery" component of the model was accomplished by formation of a research recovery team with the aim of recovering unfinished, and/or unpublished research projects. The abstract book comprised 103 abstracts: 52.4% original research studies, 12.6% review articles, and 34.9% case report/series. Only 8.7% abstracts were of basic science research whereas the remaining 91.3% were clinical research papers. Only 34% had been published in an article form in a biomedical research journal (51.4% in international journals and 48.6% in national journals); remaining papers were either in submission/preparation process or had been abandoned. As part of research recovery, 29.4% projects were recovered within 12 weeks of the retreat component. We conclude that the model of "research-retreat-recovery" is highly successful in the context of neurosurgery departments in developing countries without a proper research unit, and can result in better organization of departmental research, recovery of unfinished projects, and initiation of new research studies.

  10. Digital Learning Compass: Distance Education State Almanac 2017. Washington

    Science.gov (United States)

    Seaman, Julia E.; Seaman, Jeff

    2017-01-01

    This brief report uses data collected under the U.S. Department of Education's National Center for Educational Statistics (NCES) Integrated Postsecondary Education Data System (IPEDS) Fall Enrollment survey to highlight distance education data in the state of Washington. The sample for this analysis is comprised of all active, degree-granting…

  11. 78 FR 46258 - Drawbridge Operation Regulation Lake Washington, Seattle, WA

    Science.gov (United States)

    2013-07-31

    ... that governs the Evergreen Point Floating Bridge (State Route 520 across Lake Washington) at Seattle... Department of Transportation has requested that the draw span of the Evergreen Point Floating Bridge (State... this time, which would divert road traffic onto the Evergreen Point Floating Bridge. The closure of the...

  12. BASEMAP, WASHINGTON COUNTY, MS

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — FEMA Framework Basemap datasets comprise six of the seven FGDC themes of geospatial data that are used by most GIS applications (Note: the seventh framework theme,...

  13. FLOODPLAIN, WASHINGTON COUNTY, TEXAS

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — The Floodplain Mapping/Redelineation study deliverables depict and quantify the flood risks for the study area. The primary risk classificatinos used are the...

  14. COASTAL, Pacific, Washington

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Coastal study data as defined in FEMA Guidelines and Specifications, Appendix D: Guidance for Coastal Flooding Analyses and Mapping, submitted as a coastal study.

  15. TERRAIN, Kittitas, Washington

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — The Kittitas AOI consists of two areas. These areas were to be collected to the 'highest' accuracy requirement. Ground Control is collected throughout the AOI for...

  16. FLOODPLAIN, WASHINGTON COUNTY, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — The Floodplain Mapping/Redelineation study deliverables depict and quantify the flood risks for the study area. The primary risk classifications used are the...

  17. TERRAIN, SNOHOMISH COUNTY, WASHINGTON

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Terrain data, as defined in FEMA Guidelines and Specifications, Appendix M: Data Capture Standards, describes the digital topographic data that was used to create...

  18. TERRAIN, CLALLAM COUNTY, WASHINGTON

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Terrain data, as defined in FEMA Guidelines and Specifications, Appendix M: Data Capture Standards, describes the digital topographic data that was used to create...

  19. TERRAIN, KITSAP COUNTY, WASHINGTON

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Terrain data, as defined in FEMA Guidelines and Specifications, Appendix M: Data Capture Standards, describes the digital topographic data that was used to create...

  20. BASEMAP, WASHINGTON COUNTY, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Basemap datasets comprise six of the seven FGDC themes of geospatial data that are used by most GIS applications (Note: the seventh framework theme, orthographic...

  1. The Frontlines of Medicine Project: a proposal for the standardized communication of emergency department data for public health uses including syndromic surveillance for biological and chemical terrorism.

    Science.gov (United States)

    Barthell, Edward N; Cordell, William H; Moorhead, John C; Handler, Jonathan; Feied, Craig; Smith, Mark S; Cochrane, Dennis G; Felton, Christopher W; Collins, Michael A

    2002-04-01

    The Frontlines of Medicine Project is a collaborative effort of emergency medicine (including emergency medical services and clinical toxicology), public health, emergency government, law enforcement, and informatics. This collaboration proposes to develop a nonproprietary, "open systems" approach for reporting emergency department patient data. The common element is a standard approach to sending messages from individual EDs to regional oversight entities that could then analyze the data received. ED encounter data could be used for various public health initiatives, including syndromic surveillance for chemical and biological terrorism. The interlinking of these regional systems could also permit public health surveillance at a national level based on ED patient encounter data. Advancements in the Internet and Web-based technologies could allow the deployment of these standardized tools in a rapid time frame.

  2. U.S. Department of Energy Hydrogen and Fuel Cells Program: 2017 Annual Merit Review and Peer Evaluation Report

    Energy Technology Data Exchange (ETDEWEB)

    Popovich, Neil A [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-10-18

    The fiscal year 2017 U.S. Department of Energy (DOE) Hydrogen and Fuel Cells Program Annual Merit Review and Peer Evaluation Meeting (AMR), in conjunction with DOE's Vehicle Technologies Office AMR, was held from June June 5-9, 2017, in Washington, D.C. This report is a summary of comments by AMR peer reviewers about the hydrogen and fuel cell projects funded by DOE's Office of Energy Efficiency and Renewable Energy.

  3. AFSC/NMML/CCEP: Harbor seal demography in Washington; capture, tagging, branding data from 1981 to 2007

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The National Marine Mammal Laboratories' California Current Ecosystem Program (AFSC/NOAA) in collaboration with Washington Department of Fish and Wildlife captured...

  4. Travelers' use of the WSDOT traffic conditions web site : customer satisfaction evaluation -- Metropolitan Model Deployment Initiative : Seattle, Washington

    Science.gov (United States)

    2000-01-28

    This report presents the results of an evaluation of public use of the Washington State Department of Transportation's (WSDOT) traffic conditions web site. This research was sponsored by the US Department of Transportation to assess customer satisfac...

  5. Recent developments: Washington focus

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    Congress reconvened on January 23, but most of Washington's January new involves the Administration. DOE sent two letters to USEC customers, awarded a contract for the independent financial review of the enrichment program, and released a plan for demonstrating AVLIS by 1992. A General Accounting Office (GAO) report investigating the impact of imports of Soviet EUP into the US was made public. Both Congress and the administration are reportedly considering a full-scope US-Soviet Agreement for Nuclear Cooperation. Finally, published reports indicate Congress may consider ending the customs user fee which levies a charge of 0.17% on the value of all imported goods. The fee is felt to violate the General Agreement on Tariffs and Trade (GATT) and is not based on recovering actual Customs costs for processing a good. The fee brings the Treasury over $700 million per year, but the business community plans to lobby hard for its outright elimination or a change in authority to collect the fee based on actual costs

  6. Final environmental assessment for the U.S. Department of Energy, Oak Ridge Operations receipt and storage of uranium materials from the Fernald Environmental Management Project site

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    Through a series of material transfers and sales agreements over the past 6 to 8 years, the Fernald Environmental Management Project (FEMP) has reduced its nuclear material inventory from 14,500 to approximately 6,800 metric tons of uranium (MTU). This effort is part of the US Department of energy`s (DOE`s) decision to change the mission of the FEMP site; it is currently shut down and the site is being remediated. This EA focuses on the receipt and storage of uranium materials at various DOE-ORO sites. The packaging and transportation of FEMP uranium material has been evaluated in previous NEPA and other environmental evaluations. A summary of these evaluation efforts is included as Appendix A. The material would be packaged in US Department of Transportation-approved shipping containers and removed from the FEMP site and transported to another site for storage. The Ohio Field Office will assume responsibility for environmental analyses and documentation for packaging and transport of the material as part of the remediation of the site, and ORO is preparing this EA for receipt and storage at one or more sites.

  7. Final environmental assessment for the U.S. Department of Energy, Oak Ridge Operations receipt and storage of uranium materials from the Fernald Environmental Management Project site

    International Nuclear Information System (INIS)

    1999-01-01

    Through a series of material transfers and sales agreements over the past 6 to 8 years, the Fernald Environmental Management Project (FEMP) has reduced its nuclear material inventory from 14,500 to approximately 6,800 metric tons of uranium (MTU). This effort is part of the US Department of energy's (DOE's) decision to change the mission of the FEMP site; it is currently shut down and the site is being remediated. This EA focuses on the receipt and storage of uranium materials at various DOE-ORO sites. The packaging and transportation of FEMP uranium material has been evaluated in previous NEPA and other environmental evaluations. A summary of these evaluation efforts is included as Appendix A. The material would be packaged in US Department of Transportation-approved shipping containers and removed from the FEMP site and transported to another site for storage. The Ohio Field Office will assume responsibility for environmental analyses and documentation for packaging and transport of the material as part of the remediation of the site, and ORO is preparing this EA for receipt and storage at one or more sites

  8. Kalispel Resident Fish Project : Annual Report, 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Andersen, Todd [Kalispel Natural Resource Department

    2009-07-08

    In 2008, the Kalispel Natural Resource Department (KNRD) continued to implement its habitat enhancement projects for bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi). Baseline fish population and habitat assessments were conducted in Upper West Branch Priest River. Additional fish and habitat data were collected for the Granite Creek Watershed Assessment, a cooperative project between KNRD and the U.S. Forest Service Panhandle National Forest (FS) . The watershed assessment, funded primarily by the Salmon Recovery Funding Board of the State of Washington, will be completed in 2009.

  9. Data Validation Package May 2016 Groundwater Sampling at the Sherwood, Washington, Disposal Site August 2016

    Energy Technology Data Exchange (ETDEWEB)

    Kreie, Ken [USDOE Office of Legacy Management, Washington, DC (United States); Traub, David [Navarro Research and Engineering, Inc., Oak Ridge, TN (United States)

    2016-08-04

    The 2001 Long-Term Surveillance Plan (LTSP) for the US. Department of Energy Sherwood Project (UMI'RCA Title II) Reclamation Cell, Wellpinit, Washington, does not require groundwater compliance monitoring at the Sherwood site. However, the LTSP stipulates limited groundwater monitoring for chloride and sulfate (designated indicator parameters) and total dissolved solids (TDS) as a best management practice. Samples were collected from the background well, MW-2B, and the two downgradient wells, MW-4 and MW-10, in accordance with the LTSP. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for US. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). Water levels were measured in all wells prior to sampling and in four piezometers completed in the tailings dam. Time-concentration graphs included in this report indicate that the chloride, sulfate, and TDS concentrations are consistent with historical measurements. The concentrations of chloride and sulfate are well below the State of Washington water quality criteria value of 250 milligrams per liter (mg/L) for both parameters.

  10. Integrated Digital English Acceleration (I-DEA). Washington's Community and Technical Colleges

    Science.gov (United States)

    Washington State Board for Community and Technical Colleges, 2015

    2015-01-01

    Washington state has a large and rapidly growing foreign-born population. In 2011, immigrants made up 16.5 percent of Washington's civilian employed workforce, up from 7.1 percent in 1990. These new arrivals create jobs by forming businesses, spending income in local economies and raising employers' productivity. Thanks to project I-DEA…

  11. Literature review for Texas Department of Transportation Research Project 0-4695: Guidance for design in areas of extreme bed-load mobility, Edwards Plateau, Texas

    Science.gov (United States)

    Heitmuller, Franklin T.; Asquith, William H.; Fang, Xing; Thompson, David B.; Wang, Keh-Han

    2005-01-01

    A review of the literature addressing sediment transport in gravel-bed river systems and structures designed to control bed-load mobility is provided as part of Texas Department of Transportation research project 0–4695: Guidance for Design in Areas of Extreme Bed-Load Mobility. The study area comprises the western half of the Edwards Plateau in central Texas. Three primary foci of the literature review are journal articles, edited volumes, and government publications. Major themes within the body of literature include deterministic sediment transport theory and equations, development of methods to measure and analyze fluvial sediment, applications and development of theory in natural channels and flume experiments, and recommendations for river management and structural design. The literature review provides an outline and foundation for the research project to characterize extreme bed-load mobility in rivers and streams across the study area. The literature review also provides a basis upon which potential modifications to low-water stream-crossing design in the study area can be made.

  12. Annual report on the US Department of Energy's cultural resource activities at Colorado UMTRA Project sites for October 1991--September 1992

    International Nuclear Information System (INIS)

    1993-01-01

    This report summarizes the US Department of Energy's (DOE) cultural resource studies that were undertaken in support of the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project in the state of Colorado for the period of October 1, 1991, through September 30, 1992. This report fulfills the DOE's obligation to provide an annual report to the state of Colorado on the status and results of cultural resource studies conducted during the above period of record. This requirement is stated in a programmatic memorandum of agreement executed between the DOE, the Advisory Council on Historic Preservation, and the Colorado State Historic Preservation Officer in December 1984. Previous reports were based on a calendar year reporting period. However, in order to be more consistent with the programmatic memorandum of agreement, the period of record for this and subsequent annual reports has been changed to the Federal fiscal year. The current status and summaries of 1992 cultural resource surveys are provided for all UMTRA Project sites in Colorado. The sites are Durango, Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock

  13. Social Vulnerability Index (SoVI) for Washington based on 2000 Census Block Groups

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data depicts the social vulnerability of Washington census block groups to environmental hazards. Data were culled primarily from the 2000 Decennial Census.

  14. 12 CFR 4.4 - Washington office.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Washington office. 4.4 Section 4.4 Banks and... EXAMINERS Organization and Functions § 4.4 Washington office. The Washington office of the OCC is the main office and headquarters of the OCC. The Washington office directs OCC policy, oversees OCC operations...

  15. Yakima/Klickitat Fisheries Project Genetic Studies; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2005-2006 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Busack, Craig A.; Fritts, Anthony L.; Kassler, Todd (Washington Department of Fish and Wildlife, Olympia, WA)

    2006-05-01

    This report covers one of many topics under the Yakima/Klickitat Fisheries Project's Monitoring and Evaluation Program (YKFPME). The YKFPME is funded under two BPA contracts, one for the Yakama Nation and the other for the Washington Department of Fish and Wildlife (Contract number 22370, Project Number 1995-063-25). A comprehensive summary report for all of the monitoring and evaluation topics will be submitted after all of the topical reports are completed. This approach to reporting enhances the ability of people to get the information they want, enhances timely reporting of results, and provides a condensed synthesis of the whole YKFPME. The current report was completed by the Washington Department of Fish and Wildlife.

  16. Ocean Uses: Oregon and Washington (PROUA)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This Pacific Regional Ocean Uses Atlas (PROUA) Project is an innovative partnership between NOAA and the Bureau of Ocean Energy Management (BOEM) designed to...

  17. DCS Hydraulics Submission for Washington County, NE

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Recent developments in digital terrain and geospatial database management technology make it possible to protect this investment for existing and future projects to...

  18. DCS Hydraulic Submission for Washington County, Ohio

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Recent developments in digital terrain and geospatial database management technology make it possible to protect this investment for existing and future projects to...

  19. A Review of the Environmental Impacts for Marine and Hydrokinetic Projects to Inform Regulatory Permitting: Summary Findings from the 2015 Workshop on Marine and Hydrokinetic Technologies, Washington, D.C.

    Energy Technology Data Exchange (ETDEWEB)

    Baring-Gould, E. Ian [National Renewable Energy Lab. (NREL), Golden, CO (United States); Christol, Corrie [National Renewable Energy Lab. (NREL), Golden, CO (United States); LiVecchi, Al [National Renewable Energy Lab. (NREL), Golden, CO (United States); Kramer, Sharon [H.T. Harvey and Associates, Los Gatos, CA (United States); West, Anna [Kearns & West, Inc., San Francisco, CA (United States)

    2016-07-01

    In 2014 and 2015, the U.S. Department of Energy initiated efforts to develop and implement technology- and application-focused marine and hydrokinetic (MHK) workshops to share the global experience and knowledge base on evolving MHK technologies, observed and not-observed impacts, monitoring and measurement methods, and regulatory needs. The resulting MHK Regulator Workshops engaged resource managers and other decision makers at key regulatory organizations, scientists, researchers, facilitators, and technical experts and provided an opportunity to examine the risks of single-device and small-scale deployments, explore what can be learned and observed from single devices and small-scale arrays, and consider requirements for projects at varying scales of deployment. Experts and stakeholders identified key remaining information gaps. Initial discussions focused on differentiating between monitoring required for single or small-scale deployments and MHK impact research that, although important, goes beyond what is feasible or should be needed to meet specific project regulatory requirements but is appropriate for broader research and development. Four areas of identified potential environmental impacts provided the focus for the workshop: acoustic output impacts, electromagnetic field (EMF) emissions, physical interactions, and environmental effects of MHK energy development on the physical environment. Discussions also focused on the regulatory process and experience, adaptive management, industry drivers, and lessons that can be learned from the wind energy industry. The discussion was set in the context of the types of MHK technologies that are currently proposed or planned in the United States. All presentations and the following discussions are summarized in this document.

  20. Historical changes to Lake Washington and route of the Lake Washington Ship Canal, King County, Washington

    Science.gov (United States)

    Chrzastowski, Michael J.

    1983-01-01

    Lake Washington, in the midst of the greater Seattle metropolitan area of the Puget Sound region (fig. 1), is an exceptional commercial, recreational, and esthetic resource for the region . In the past 130 years, Lake Washington has been changed from a " wild " lake in a wilderness setting to a regulated lake surrounded by a growing metropolis--a transformation that provides an unusual opportunity to study changes to a lake's shoreline and hydrologic characteristics -resulting from urbanization.

  1. Greenhouse gas mitigation options for Washington State

    Energy Technology Data Exchange (ETDEWEB)

    Garcia, N.

    1996-04-01

    President Clinton, in 1993, established a goal for the United States to return emissions of greenhouse gases to 1990 levels by the year 2000. One effort established to help meet this goal was a three part Environmental Protection Agency state grant program. Washington State completed part one of this program with the release of the 1990 greenhouse gas emissions inventory and 2010 projected inventory. This document completes part two by detailing alternative greenhouse gas mitigation options. In part three of the program EPA, working in partnership with the States, may help fund innovative greenhouse gas reduction strategies. The greenhouse gas control options analyzed in this report have a wide range of greenhouse gas reductions, costs, and implementation requirements. In order to select and implement a prudent mix of control strategies, policy makers need to have some notion of the potential change in climate, the consequences of that change and the uncertainties contained therein. By understanding the risks of climate change, policy makers can better balance the use of scarce public resources for concerns that are immediate and present against those that affect future generations. Therefore, prior to analyzing alternative greenhouse gas control measures, this report briefly describes the phenomenon and uncertainties of global climate change, and then projects the likely consequences for Washington state.

  2. Washington State University Algae Biofuels Research

    Energy Technology Data Exchange (ETDEWEB)

    chen, Shulin [Washington State Univ., Pullman, WA (United States). Dept. of Biological Systems Engineering; McCormick, Margaret [Targeted Growth, Inc., Seattle, WA (United States); Sutterlin, Rusty [Inventure Renewables, Inc., Gig Harbor, WA (United States)

    2012-12-29

    The goal of this project was to advance algal technologies for the production of biofuels and biochemicals by establishing the Washington State Algae Alliance, a collaboration partnership among two private companies (Targeted Growth, Inc. (TGI), Inventure Chemicals (Inventure) Inc (now Inventure Renewables Inc) and Washington State University (WSU). This project included three major components. The first one was strain development at TGI by genetically engineering cyanobacteria to yield high levels of lipid and other specialty chemicals. The second component was developing an algal culture system at WSU to produce algal biomass as biofuel feedstock year-round in the northern states of the United States. This system included two cultivation modes, the first one was a phototrophic process and the second a heterotrophic process. The phototrophic process would be used for algae production in open ponds during warm seasons; the heterotrophic process would be used in cold seasons so that year-round production of algal lipid would be possible. In warm seasons the heterotrophic process would also produce algal seeds to be used in the phototrophic culture process. Selected strains of green algae and cyanobacteria developed by TGI were tested in the system. The third component was downstream algal biomass processing by Inventure that included efficiently harvesting the usable fuel fractions from the algae mass and effectively isolating and separating the usable components into specific fractions, and converting isolated fractions into green chemicals.

  3. The Department of the Interior Southeast Climate Science Center synthesis report 2011–15—Projects, products, and science priorities

    Science.gov (United States)

    Varela Minder, Elda; Lascurain, Aranzazu R.; McMahon, Gerard

    2016-09-28

    IntroductionIn 2009, the U.S. Department of the Interior (DOI) Secretary Ken Salazar established a network of eight regional Climate Science Centers (CSCs) that, along with the Landscape Conservation Cooperatives (LCCs), would help define and implement the Department's climate adaptation response. The Southeast Climate Science Center (SE CSC) was established at North Carolina State University (NCSU) in Raleigh, North Carolina, in 2010, under a 5-year cooperative agreement with the U.S. Geological Survey (USGS), to identify and address the regional challenges presented by climate change and variability in the Southeastern United States. All eight regional CSC hosts, including NCSU, were selected through a competitive process.Since its opening, the focus of the SE CSC has been on working with partners in the identification and development of research-based information that can assist managers, including cultural and natural resource managers, in adapting to global change processes, such as climate and land use change, that operate at local to global scales and affect resources important to the DOI mission. The SE CSC was organized to accomplish three goals:Provide co-produced, researched based, actionable science that supports transparent global change adaptation decisions.Convene conversations among decision makers, scientists, and managers to identify key ecosystem adaptation decisions driven by climate and land use change, the values and objectives that will be used to make decisions, and the research-based information needed to assess adaptation options.Build the capacity of natural resource professionals, university faculty, and students to understand and frame natural resource adaptation decisions and develop and use research-based information to make adaptation decisions.This report provides an overview of the SE CSC and the projects developed by the SE CSC since its inception. An important goal of this report is to provide a framework for understanding the

  4. Pacific Northwest National Laboratory Apatite Investigation at the 100-NR-2 Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-03-28

    This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by staff working on the 100-NR-2 Apatite Project. The U.S. Department of Energy, Fluor Hanford, Inc., Pacific Northwest National Laboratory, and the Washington Department of Ecology agreed that the long-term strategy for groundwater remediation at 100-N would include apatite sequestration as the primary treatment, followed by a secondary treatment. The scope of this project covers the technical support needed before, during, and after treatment of the targeted subsurface environment using a new high-concentration formulation.

  5. Washington Windplant No. 1: Botanical resources field survey. Appendix B to Washington Windplant No. 1 EIS

    International Nuclear Information System (INIS)

    1994-12-01

    KENETECH Windpower, Inc., has applied to Klickitat County for a conditional use permit to construct and operate a 115 Megawatt windfarm on an approximately 5110 hectare (12,630 acre) site in the Columbia Hills near Goldendale, Washington. A transmission services agreement between the Bonneville Power Administration (BPA) and utilities purchasing the Project's output will also be required. Klickitat County and BPA initiated the preparation of a joint SEPA/NEPA Environmental Impact Statement, under the authority of the Washington State Environmental Policy Act and the National Environmental Policy Act. The EIS addresses, among other issues, the Project's potential impact on rare, threatened or endangered, and sensitive plant species and communities as well as plant species of potential cultural importance. A field survey along potential impact corridors (turbine strings, roadways, and the transmission line alignment) was conducted between April and June, 1994 in order to identify rare plant species, high-quality native plant communities, and plant species of potential cultural importance present in these corridors. In addition, habitat maps of the entire 5110-ha project area were field verified. This report contains the results of that survey and an assessment of the potential project impacts

  6. Waste management and technologies analytical database project for Los Alamos National Laboratory/Department of Energy. Final report, June 7, 1993--June 15, 1994

    International Nuclear Information System (INIS)

    1995-01-01

    The Waste Management and Technologies Analytical Database System (WMTADS) supported by the Department of Energy's (DOE) Office of Environmental Management (EM), Office of Technology Development (EM-50), was developed and based at the Los Alamos National Laboratory (LANL), Los Alamos, New Mexico, to collect, identify, organize, track, update, and maintain information related to existing/available/developing and planned technologies to characterize, treat, and handle mixed, hazardous and radioactive waste for storage and disposal in support of EM strategies and goals and to focus area projects. WMTADS was developed as a centralized source of on-line information regarding technologies for environmental management processes that can be accessed by a computer, modem, phone line, and communications software through a Local Area Network (LAN), and server connectivity on the Internet, the world's largest computer network, and with file transfer protocol (FTP) can also be used to globally transfer files from the server to the user's computer through Internet and World Wide Web (WWW) using Mosaic

  7. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  8. Oil spill response issues in Washington State

    International Nuclear Information System (INIS)

    Lempriere, P.R.

    1997-01-01

    Washington State statutes and regulations applicable to oil transport and oil spills were described. Specific provisions of the statutes and regulations and other relevant matters were also discussed. Among these were: (1) Washington State oil spill prevention plans, (2) Washington State oil spill contingency plans, (3) best achievable protection, (4) Intertanko's lawsuit against Washington State, (5) oil spill removal organizations, (6) certificates of financial responsibility in Washington State, (7) extent of potential liability under Washington Law, (8) disposal of cleanup materials, and (9) definition of 'qualified individuals' on marine vessels having the authority to implement removal actions

  9. Blades and disks in gas turbines. Material and component behaviour. Project department D. Final report; Schaufeln und Scheiben in Gasturbinen. Werkstoff- und Bauteilverhalten. Projektbereich D. Abschlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-04-01

    The Special Research Department No. 339, ``Disks and Blades in Gas Turbines - Material and Component Characteristics`` received financial support from 1988 through 1996. This final report discusses activities of the years 1994, 1995, and 1996. Project group D, ``Production and Quality Assurance``, investigated rotors and blades. Grinding techniques were developed and optimized for nickel base materials, and the effects of grinding on the marginal zones was investigated, including an analysis of intrinsic stresses induced by machining. In the field of ceramics, separation and production of reinforced ceramics was investigated, and techniques for vacuum soldering of ceramic/ceramic and ceramic/metal compounds for high-temperature applications were developed. In the framework of a part-project carried out at HMI, neutron diffraction was used for nondestructive analysis of volume intrinsic stresses near the joint both on model geometries and on the joint between metal shaft and ceramic rotor. The development and application of computerized tomography for testing of ceramic rotors and joints was an important contribution to quality assurance. (orig./MM) [Deutsch] Der Sonderforschungsbereich 339 `Schaufeln und Scheiben in Gasturbinen - Werkstoff- und Bauteilverhalten` wurde von 1988 bis Ende 1996 gefoerdert. Der vorliegende Abschlussbericht behandelt vor allem die Arbeiten der Jahre 1994, 1995 und 1996. Am Bauteil Rotor und Schaufel orientierten sich die Arbeiten des Projektbereichs D `Fertigung und Qualitaetssicherung`. Zum einen wurden hier Schleifverfahren fuer Nickelbasis-Werkstoffe entwickelt und optimiert und der Einfluss der Schleifbearbeitung auf die Randzoneneigenschaften studiert. Zur Randzonencharakterisierung gehoerte insbesondere auch die Analyse bearbeitungsinduzierter Eigenspannungen. Auf der Seite der Keramiken wurde zum einen die trennende Fertigung verstaerkter Keramiken untersucht. Zum anderen wurden Techniken fuer das Hochvakuumloeten von Keramik

  10. Local Health Departments’ Use of Twitter

    Centers for Disease Control (CDC) Podcasts

    This podcast is an interview with Jenine K. Harris, PhD, from the Brown School at Washington University in St. Louis, MO, about local health departments’ use of Twitter to disseminate diabetes information.

  11. Former Virginia Tech Aerospace and Ocean Engineering Department Head Dies

    OpenAIRE

    Gilbert, Karen

    2003-01-01

    James B. Eades, Jr., retired aerospace research scientist from Bluefield, W. Wa., and former professor and department head of aerospace and ocean engineering at Virginia Tech, died Dec. 14 at Veteran's Hospital in Washington, D.C. He was 80.

  12. Promoting academic excellence through leadership development at the University of Washington: the Teaching Scholars Program.

    Science.gov (United States)

    Robins, Lynne; Ambrozy, Donna; Pinsky, Linda E

    2006-11-01

    The University of Washington Teaching Scholars Program (TSP) was established in 1995 to prepare faculty for local and national leadership and promote academic excellence by fostering a community of educational leaders to innovate, enliven, and enrich the environment for teaching and learning at the University of Washington (UW). Faculty in the Department of Medical Education and Biomedical Informatics designed and continue to implement the program. Qualified individuals from the UW Health Sciences Professional Schools and foreign scholars who are studying at the UW are eligible to apply for acceptance into the program. To date, 109 faculty and fellows have participated in the program, the majority of whom have been physicians. The program is committed to interprofessional education and seeks to diversify its participants. The curriculum is developed collaboratively with each cohort and comprises topics central to medical education and an emergent set of topics related to the specific interests and teaching responsibilities of the participating scholars. Core sessions cover the history of health professions education, learning theories, educational research methods, assessment, curriculum development, instructional methods, professionalism, and leadership. To graduate, scholars must complete a scholarly project in curriculum development, faculty development, or educational research; demonstrate progress towards construction of a teaching portfolio; and participate regularly and actively in program sessions. The TSP has developed and nurtured an active cadre of supportive colleagues who are transforming educational practice, elevating the status of teaching, and increasing the recognition of teachers. Graduates fill key teaching and leadership positions at the UW and in national and international professional organizations.

  13. Development of the University of Washington Biofuels and Biobased Chemicals Process Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Gustafson, Richard [University of Washington

    2014-02-04

    The funding from this research grant enabled us to design and build a bioconversion steam explosion reactor and ancillary equipment such as a high pressure boiler and a fermenter to support the bioconversion process research. This equipment has been in constant use since its installation in 2012. Following are research projects that it has supported: • Investigation of novel chip production method in biofuels production • Investigation of biomass refining following steam explosion • Several studies on use of different biomass feedstocks • Investigation of biomass moisture content on pretreatment efficacy. • Development of novel instruments for biorefinery process control Having this equipment was also instrumental in the University of Washington receiving a $40 million grant from the US Department of Agriculture for biofuels development as well as several other smaller grants. The research that is being done with the equipment from this grant will facilitate the establishment of a biofuels industry in the Pacific Northwest and enable the University of Washington to launch a substantial biofuels and bio-based product research program.

  14. 75 FR 33736 - Tart Cherries Grown in the States of Michigan, New York, Pennsylvania, Oregon, Utah, Washington...

    Science.gov (United States)

    2010-06-15

    ...., Stop 0237, Washington, DC 20250-0237; telephone: (202) 720-2491, Fax: (202) 720-8938, or E-mail: Laurel... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 930 [Doc. No. AO-370-A8; AMS..., Oregon, Utah, Washington, and Wisconsin; Withdrawal of Proposed Rule AGENCY: Agricultural Marketing...

  15. Status of birds at the Hanford Site in southeastern Washington

    International Nuclear Information System (INIS)

    Landeen, D.S.; Johnson, A.R.; Mitchell, R.M.

    1992-06-01

    The US Department of Energy has entered into agreements with the Washington State Department of Ecology, the US Environmental Protection Agency, and Hanford Site contractors to focus work activities on cleanup and stabilization of radioactive and hazardous waste sites located at the Hanford Site in southeastern Washington. Ecological characterization is an essential part of the remediation process, and the identification of biotic components such as bird species that could be impacted by cleanup activities is an important part of the initial environmental characterizations. Site characterization work has resulted in this list of 238 birds that have been observed at the Hanford Site. This list is presented with a status rating for abundance and seasonal occurrence

  16. 78 FR 15053 - Simpson Lumber Company, LLC, Shelton, Washington; Simpson Lumber Company, LLC, Tacoma, Washington...

    Science.gov (United States)

    2013-03-08

    ...,372B] Simpson Lumber Company, LLC, Shelton, Washington; Simpson Lumber Company, LLC, Tacoma, Washington; Simpson Lumber Company, LLC, Longview, Washington; Notice of Revised Determination on Reconsideration On... Reconsideration for the workers and former workers of Simpson Lumber Company, LLC, Shelton, Washington (TA-W-81...

  17. Avian use of proposed KENETECH and CARES wind farm sites in Klickitat County, Washington: Technical report. Appendix D

    International Nuclear Information System (INIS)

    1995-01-01

    The Columbia Hills area above (north of) the Columbia River in Klickitat County, in southcentral Washington, is being considered for development of two wind power generation projects that could include the eventual placement of up to 436 wind turbines. The KENETECH Windpower Washington Windplant trademark Number 1 project would include placing up to 345 KENETECH 33M-VS turbines, capable of producing up to 115 megawatts (MW), in 39 rows (strings) on a 5,110-hectare (12,630-acre) site. The Conservation and Renewable Energy Systems (CARES) Columbia Wind Farm number-sign 1 project would include placing 91 Flowind AWT-26 turbines, capable of generating 25 MW, in 11 rows on a 395-hectare (975-acre) site. During scoping for these proposed developments, concerns were raised regarding the potential for avian mortality associated with wind farm development. Collision with wind turbine blade, towers, guy wires, and transmission lines, and electrocution from power lines have been identified as sources of avian mortality, particularly raptors, at existing wind farm facilities. To address these concerns, an avian study was conducted at the site in accordance with an avian study plan and protocol developed, with input from a national avian task force, state agencies (Washington Department of Fish and Wildlife [WDFW]), and federal agencies (USFWS). The study included four elements: (1) a winter raptor and waterfowl study, (2) spring migration and fall migration studies, (3) a summer resident study, and (4) a raptor breeding study. The study involved extensive field studies conducted by biologists experienced in identifying raptors and other birds

  18. Memorial—John A. Washington II, M.D.▿

    OpenAIRE

    2010-01-01

    John A. Washington II, M.D., former Head of Clinical Microbiology at the Mayo Clinic from 1972 to 1986 and Chairman of the Department of Microbiology at the Cleveland Clinic from 1986 to 1992, died on 5 September 2010 at the age of 74. John was an internationally recognized, widely respected leader in the disciplines of clinical microbiology and infectious diseases, authoring more than 450 scientific articles, books, and book chapters and training scores of pathology residents and clinical mi...

  19. Energy from biomass. Summaries of the Biomass Projects carried out as part of the Department of Trade and Industry`s New and Renewable Energy Programme. Vol. 4: anaerobic digestion for biogas

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    These volumes of summaries provide easy access to the many projects carried out in the Energy from Biomass programme area as part of the Department of Trade and Industry`s New and Renewable Energy Programme. The summaries in this volume cover contractor reports on the subject published up to December 1997. (author)

  20. Energy from biomass. Summaries of the Biomass Projects carried out as part of the Department of Trade and Industry's New and Renewable Energy Programme. Vol. 3: converting wood fuel to energy

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    These volumes of summaries provide easy access to the many projects carried out in the Energy from Biomass programme area as part of the Department of Trade and Industry's New and Renewable Energy Programme. The summaries in this volume cover contractor reports on the subject published up to December 1997. (author)

  1. Energy from biomass. Summaries of the Biomass Projects carried out as part of the Department of Trade and Industry's New and Renewable Energy Programme. Vol. 5: straw, poultry litter and energy crops as energy sources

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-01-01

    These volumes of summaries provide easy access to the many projects carried out in the Energy from Biomass programme area as part of the Department of Trade and Industry's New and Renewable Energy Programme. The summaries in this volume cover contractor reports on the subject published up to December 1997. (author)

  2. Metallurgy Department

    DEFF Research Database (Denmark)

    Risø National Laboratory, Roskilde

    The activities of the Metallurgy Department at Risø during 1981 are described. The work is presented in three chapters: General Materials Research, Technology and Materials Development, Fuel Elements. Furthermore, a survey is given of the department's participation in international collaboration...

  3. Harbor seal demography in Washington; capture, tagging, branding data collected from 1981-04-09 to 2007-11-20 (NCEI Accession 0140930)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The National Marine Mammal Laboratories' California Current Ecosystem Program (AFSC/NOAA) in collaboration with Washington Department of Fish and Wildlife captured...

  4. Currents, temperature, and salinity measurements for the Keweenaw Interdisciplinary Transport Experiment in Superior (KITES) project by the University of Washington/University of Minnesota in Lake Superior, 1998-2001 (NODC Accession 0001204)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data collection contains current meter data from 17 moorings in Lake Superior during the years 1998-2001. Each current meter is represented by a single data file.

  5. Physical data collected from Seaglider SG012 during Washington Coast, launched 07 February 2005 in the North Pacific Ocean, Coastal Waters of Washington/Oregon deployed from 2005-02-07 to 2005-06-08 (NCEI Accession 0156075)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Seaglider is a buoyancy driven autonomous underwater vehicle (AUV) developed by scientists and engineers at the University of Washington's School of Oceanography and...

  6. Physical data collected from Seaglider SG005 during Washington Coast June 2004 in the North Pacific Ocean, Coastal Waters of Washington/Oregon deployed from 2004-06-24 to 2004-07-28 (NCEI Accession 0155971)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Seaglider is a buoyancy driven autonomous underwater vehicle (AUV) developed by scientists and engineers at the University of Washington's School of Oceanography and...

  7. Physical data collected from Seaglider SG005 during Washington Coast, September 2002 in the North Pacific Ocean, Coastal Waters of Washington/Oregon deployed from 2002-09-11 to 2002-11-03 (NCEI Accession 0155983)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Seaglider is a buoyancy driven autonomous underwater vehicle (AUV) developed by scientists and engineers at the University of Washington's School of Oceanography and...

  8. Physical data collected from Seaglider SG005 during Washington Coast August 2003 in the North Pacific Ocean, Coastal Waters of Washington/Oregon deployed from 2003-08-21 to 2004-01-20 (NCEI Accession 0155930)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Seaglider is a buoyancy driven autonomous underwater vehicle (AUV) developed by scientists and engineers at the University of Washington's School of Oceanography and...

  9. Physical data collected from Seaglider SG030 during Washington Coast 8 November 2006 in the North Pacific Ocean, Coastal Waters of Washington/Oregon deployed from 2006-11-09 to 2006-12-17 (NCEI Accession 0156188)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Seaglider is a buoyancy driven autonomous underwater vehicle (AUV) developed by scientists and engineers at the University of Washington's School of Oceanography and...

  10. Physical data collected from Seaglider SG012 during Washington Coast, December 2004 in the North Pacific Ocean, Coastal Waters of Washington/Oregon deployed from 2004-12-23 to 2005-01-25 (NCEI Accession 0156003)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Seaglider is a buoyancy driven autonomous underwater vehicle (AUV) developed by scientists and engineers at the University of Washington's School of Oceanography and...

  11. Physical data collected from Seaglider SG005 during Washington Coast, February 2003 in the North Pacific Ocean, Coastal Waters of Washington/Oregon deployed from 2003-02-08 to 2003-02-12 (NCEI Accession 0155963)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Seaglider is a buoyancy driven autonomous underwater vehicle (AUV) developed by scientists and engineers at the University of Washington's School of Oceanography and...

  12. Physical data collected from Seaglider SG002 during Washington Coast, December 2004 in the North Pacific Ocean, Coastal Waters of Washington/Oregon deployed from 2004-12-23 to 2004-12-30 (NCEI Accession 0155944)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Seaglider is a buoyancy driven autonomous underwater vehicle (AUV) developed by scientists and engineers at the University of Washington's School of Oceanography and...

  13. Physical data collected from Seaglider SG002 during Washington Coast, January 2004 in the North Pacific Ocean, Coastal Waters of Washington/Oregon deployed from 2004-01-20 to 2004-06-24 (NCEI Accession 0155959)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Seaglider is a buoyancy driven autonomous underwater vehicle (AUV) developed by scientists and engineers at the University of Washington's School of Oceanography and...

  14. Physical data collected from Seaglider SG005 during Washington Coast, 8 November 2006 in the North Pacific Ocean, Coastal Waters of Washington/Oregon deployed from 2006-11-09 to 2007-03-15 (NCEI Accession 0155980)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Seaglider is a buoyancy driven autonomous underwater vehicle (AUV) developed by scientists and engineers at the University of Washington's School of Oceanography and...

  15. Physical data collected from Seaglider SG005 during Washington Coast, 10 September 2007 in the North Pacific Ocean, Coastal Waters of Washington/Oregon deployed from 2007-09-10 to 2008-01-17 (NCEI Accession 0155995)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Seaglider is a buoyancy driven autonomous underwater vehicle (AUV) developed by scientists and engineers at the University of Washington's School of Oceanography and...

  16. Physical data collected from Seaglider SG014 during Washington Coast, 15 March 2007 in the North Pacific Ocean, Coastal Waters of Washington/Oregon deployed from 2007-03-15 to 2007-09-10 (NCEI Accession 0156140)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Seaglider is a buoyancy driven autonomous underwater vehicle (AUV) developed by scientists and engineers at the University of Washington's School of Oceanography and...

  17. Sociology at Washington University in St. Louis: History and Reflections, 1906-1989.

    Science.gov (United States)

    Pittman, David J.; Boden, Deirdre

    1990-01-01

    Traces the history of sociology at Washington University (Missouri) from 1906 to 1989 in relation to the decision to abolish the department. Maintains that this decision began in 1968. Defines the contours of the sociology department, including a discussion of prominent scholars, contending that the decision will harm the discipline in the long…

  18. 24 CFR 17.118 - Miscellaneous provisions: correspondence with the Department.

    Science.gov (United States)

    2010-04-01

    ... Department Claims Officer, Office of Finance and Accounting, Department of HUD, Washington, DC 20410. (b) The... within four working days. Salary Offset Provisions Source: Sections 17.125 through 17.140, appear at 49...

  19. 77 FR 44673 - Meeting of the Department of Justice National Motor Vehicle Title Information System Federal...

    Science.gov (United States)

    2012-07-30

    ... Department of Justice National Motor Vehicle Title Information System Federal Advisory Committee AGENCY... a meeting of Department of Justice's (DOJ's) National Motor Vehicle Title Information System (NMVTIS...., Washington, DC 20531. FOR FURTHER INFORMATION CONTACT: Todd Brighton, Designated Federal Employee (DFE...

  20. Father Secchi Goes to Washington

    Science.gov (United States)

    McCarthy, M. F.

    1994-12-01

    In 1848 a small group of Jesuit refugees arrived at Georgetown College near Washington, D.C. Among them was a young priest, Angelo Secchi, who had finished theology studies in Rome, but had not been able to complete his final examinations. This done successfully, Secchi turned to astronomy and the new facilities of the Georgetown College Observatory, directed by its founder, Fr. James Curley. During his two years in Washington, Secchi studied physics, wrote an article on Electrical Rheometry for the Smithsonian Institution, and formed a friendship with Matthew Fontaine Maury of the U.S. Navy, who headed the Chart Service and in 1844 was named superintendent of the National Observatory. This was later named the U.S. Naval Observatory. Secchi's friendships formed during the Washington visit proved most helpful for relations between European astronomers and U.S. colleagues. Secchi, after his return to Rome constructed the Observatory of the Collegio Romano atop the baroque Church of St. Ignatius in Rome and began his work in spectral classification of stars.

  1. Freedom Project

    Directory of Open Access Journals (Sweden)

    Alejandra Suarez

    2014-02-01

    Full Text Available Freedom Project trains prisoners in nonviolent communication and meditation. Two complementary studies of its effects are reported in this article. The first study is correlational; we found decreased recidivism rates among prisoners trained by Freedom Project compared with recidivism rates in Washington state. The second study compared trained prisoners with a matched-pair control group and found improvement in self-reported anger, self-compassion, and certain forms of mindfulness among the trained group. Ratings of role-plays simulating difficult interactions show increased social skills among the group trained by Freedom Project than in the matched controls.

  2. Department of Commerce Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ... the Assistant General Counsel for Legislation and Regulation, U.S. Department of Commerce, Washington... Commerce, National Oceanic and Atmospheric Administration, Building 1, 7600 Sand Point Way NE., Seattle, WA... Commerce, National Oceanic and Atmospheric Administration, 7600 Sand Point Way NE., Seattle, WA 98115 Phone...

  3. 75 FR 73059 - Record of Decision and Floodplain Statement of Findings for the Cushman Hydroelectric Project...

    Science.gov (United States)

    2010-11-29

    ... Floodplain Statement of Findings for the Cushman Hydroelectric Project, Mason County, Washington... Project in Mason County, Washington. These components include a new 3.6 megawatt (MW) powerhouse on the... components of the Cushman Hydroelectric Project in Mason County, Washington. These components include a new 3...

  4. Annual coded wire tag program (Washington) missing production groups : annual report 2000; ANNUAL

    International Nuclear Information System (INIS)

    Dammers, Wolf; Mills, Robin D.

    2002-01-01

    The Bonneville Power Administration (BPA) funds the ''Annual Coded-wire Tag Program - Missing Production Groups for Columbia River Hatcheries'' project. The Washington Department of Fish and Wildlife (WDFW), Oregon Department of Fish and Wildlife (ODFW) and the United States Fish and Wildlife Service (USFWS) all operate salmon and steelhead rearing programs in the Columbia River basin. The intent of the funding is to coded-wire tag at least one production group of each species at each Columbia Basin hatchery to provide a holistic assessment of survival and catch distribution over time and to meet various measures of the Northwest Power Planning Council's (NWPPC) Fish and Wildlife Program. The WDFW project has three main objectives: (1) coded-wire tag at least one production group of each species at each Columbia Basin hatchery to enable evaluation of survival and catch distribution over time, (2) recover coded-wire tags from the snouts of fish tagged under objective 1 and estimate survival, contribution, and stray rates for each group, and (3) report the findings under objective 2 for all broods of chinook, and coho released from WDFW Columbia Basin hatcheries. Objective 1 for FY-00 was met with few modifications to the original FY-00 proposal. Under Objective 2, snouts containing coded-wire tags that were recovered during FY-00 were decoded. Under Objective 3, this report summarizes available recovery information through 2000 and includes detailed information for brood years 1989 to 1994 for chinook and 1995 to 1997 for coho

  5. Report to Congress on the U.S. Department of Energy's Environmental Management Science Program. Research funded and its linkages to environmental cleanup problems. High out-year cost environmental management project descriptions. Volume 3 of 3 - Appendix C

    International Nuclear Information System (INIS)

    1998-04-01

    The Department of Energy's Environmental Management Science Program (EMSP) serves as a catalyst for the application of scientific discoveries to the development and deployment of technologies that will lead to reduction of the costs and risks associated with cleaning up the nation's nuclear complex. Appendix C provides details about each of the Department's 82 high cost projects and lists the EMSP research awards with potential to impact each of these projects. The high cost projects listed are those having costs greater than $50 million in constant 1998 dollars from the year 2007 and beyond, based on the March 1998 Accelerating Cleanup: Paths to Closure Draft data, and having costs of quantities of material associated with an environmental management problem area. The high cost project information is grouped by operations office and organized by site and project code. Each operations office section begins with a list of research needs associated with that operations office. Potentially related research awards are listed by problem area in the Index of Research Awards by Environmental Management Problem Area, which can be found at the end of appendices B and C. For projects that address high risks to the public, workers, or the environment, refer also the Health/Ecology/Risk problem area awards. Research needs are programmatic or technical challenges that may benefit from knowledge gained through basic research

  6. Report: State of Washington Water Pollution Control State Revolving Fund Financial Statements with Independent Auditor's Report, June 30, 2003

    Science.gov (United States)

    Report #2004-1-00067, May 26, 2004. The financial statements referred to in the first paragraph present fairly the financial position of the Washington Department of Ecology Water Pollution Control State Revolving Fund as of June 30, 2003.

  7. 2006 Puget Sound LiDAR Consortium (PSLC) Topographic LiDAR: Eastern Washington and River Corridors

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Watershed Sciences, Inc. (WS) collected Light Detection and Ranging (LiDAR) data in eastern Washington, eastern Oregon, and southern Canada in October and November,...

  8. AFSC/NMML/CCEP: Capture and resight data of California sea lions in Washington State, 1989 to 2006

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This dataset contains data from the capture and recapture of over 1500 male California sea lions (Zalophus californianus) from Washington between 1989-2006. The data...

  9. Residential Energy Efficiency Research Planning Meeting Summary Report: Washington, D.C. - October 27-28, 2011

    Energy Technology Data Exchange (ETDEWEB)

    2012-02-01

    This report summarizes key findings and outcomes from the U.S. Department of Energy's Building America Residential Energy Efficiency Research Planning meeting, held on October 28-29, 2011, in Washington, D.C.

  10. Directional wave and temperature data from nine buoys in Gray's Harbor, Washington, 1994-2002 (NODC Accession 0000756)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Wave data were collected from 9 buoys in Grays Harbor, Washington, from 01 January 1994 to 24 July 2002. Data were collected as part of the Coastal Data Information...

  11. Thermal Structure of the Cascadia Subduction Zone on the Washington Margin (AT26-04, EM122)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — We propose to conduct a comprehensive study of the thermal environment of the Cascadia Subduction Zone (CSZ) within the NSF GeoPRISM Corridor off the Washington...

  12. Joint NEPA/SEPA draft environmental impact statement Washington Windplant No. 1

    International Nuclear Information System (INIS)

    1995-02-01

    This is the draft Environmental Impact Statement for a proposed construction and operation of a 115 megawatt Washington Windplant No. 1 by KENETECH Windpower, Inc in Klickitat County, Washington. The Project would be constructed on private land (5,110 hectares) under easement to KENETECH Windpower, Inc., and would include approximately 345 type 33M-VS wind turbines. Alternatives to the Proposed Action include an alternative powerline route; a restricted areas alternative; a subarea development alternative; a no-action alternative

  13. Status of Kenyan Coral Reef lagoons. Project Report to Kenya Wildlife Services, Kenya Karine and Fisheries Researoh Institute & Kenya"s Fisheries Department.

    OpenAIRE

    McClanahan, T.; Muthiga, N.; Obura, D.; Mutere, J.; Mwachireya, S.

    1992-01-01

    This report presents the findings of Wildlife Conservation International's Coral Reef Conservation Project monitoring program of Kenyan coral reefs and suggest research and management plans for the coral reefs based on the findings.

  14. Routine environmental audit of the Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    This report documents the results of the routine environmental audit of the Hanford Site (Hanford), Richland, Washington. During this audit, the activities conducted by the audit team included reviews of internal documents an reports from previous audits and assessments; interviews with US Department of Energy (DOE), State of Washington regulatory, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted May 2--13, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). The audit evaluated the status of programs to ensure compliance with Federal, State, and local environmental laws and regulations; compliance with DOE orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements.

  15. Routine environmental audit of the Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1994-05-01

    This report documents the results of the routine environmental audit of the Hanford Site (Hanford), Richland, Washington. During this audit, the activities conducted by the audit team included reviews of internal documents an reports from previous audits and assessments; interviews with US Department of Energy (DOE), State of Washington regulatory, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted May 2--13, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). The audit evaluated the status of programs to ensure compliance with Federal, State, and local environmental laws and regulations; compliance with DOE orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements

  16. 3 December 2015 - Finnish Rector, Lapland University of Applied Sciences, M. Lampela, signing an agreement with Engineering Department Head R. Saban an the guest book with HiLumi Project Leader L. Rossi.

    CERN Multimedia

    Bennett, Sophia Elizabeth

    2015-01-01

    Also present from Finland: Principal Lecturer, Mechanical Engineering L. Kantola, Lic.Sc; Senior Lecturer, Information and Communications Technology K. Karlsson;Senior Lecturer, Mechanical Engineering A. Pikkarainen, M.Eng. Also present from CERN: HiLumi Configuration, Quality and Resource Officer I. Bejar Alonso; HiLumi Deputy Project Leader O. Brüning; HiLumi Collaboration B. Di Girolamo; HiLumi Integration and Installation Officer P. Fessia; Engineering Department M. Garlasche.

  17. 75 FR 1406 - National Mall and Memorial Parks, Washington, DC; Notice of Availability of an Environmental...

    Science.gov (United States)

    2010-01-11

    ... Washington, DC. The National Mall Plan is a long-range management plan that focuses on the use and... Spain, Project Executive. Before including your address, phone number, e-mail address, or other personal... Impact Statement. FOR FURTHER INFORMATION CONTACT: Susan Spain, Project Executive, National Mall Plan at...

  18. Grand Coulee Dam Wildlife Mitigation Program : Pygmy Rabbit Programmatic Management Plan, Douglas County, Washington.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul

    1992-06-01

    The Northwest Power Planning Council and the Bonneville Power Administration approved the pygmy rabbit project as partial mitigation for impacts caused by the construction of Grand Coulee Dam. The focus of this project is the protection and enhancement of shrub-steppe/pygmy rabbit habitat in northeastern Washington.

  19. Department o

    African Journals Online (AJOL)

    USER

    2016-10-31

    Oct 31, 2016 ... Department of Urban and Regional Planning, University of Ibadan, Oyo State, Nigeria. 2 ... Geospatial techniques were used for this study; data from primary and secondary source ... development, for instance, Nigeria cities .... (road network, road medians and water ..... Countries: A Case Study of Nigeria.

  20. Electronics department

    International Nuclear Information System (INIS)

    1979-01-01

    This report summarizes the activities in 1978 of some of the groups within the Electronics Department. The work covered includes plant protection and operator studies, reliability techniques, application of nuclear techniques to mineral exploration, applied laser physics, computing and, lastly, research instrumentation. (author)

  1. Safety evaluation report related to the construction of Skagit/Hanford Nuclear Project, Units 1 and 2. Docket Nos. STN 50-522 and 50-523

    International Nuclear Information System (INIS)

    1982-12-01

    Supplement 3 to the Safety Evaluation Report for the application filed by Puget Sound Power and Light Company on behalf of itself, the Pacific Power and Light Company, The Washington Water Power Company, and the Portland General Electric Company for construction permits to build the Skagit/Hanford Nuclear Project has been issued by the Office of Nuclear Reactor Regulation of the United States Nuclear Regulatory Commission. This supplement is an evaluation of the site relocation amendment to the Preliminary Safety Analysis Report. The proposed site has been relocated from Skagit County, Washington, to the Department of Energy's Hanford Reservation

  2. Annual report to the Advisory Council on Historic Preservation and the Colorado State Historic Preservation Officer on the US Department of Energy's cultural resource activities at Colorado UMTRA Project sites, January--December 1991

    International Nuclear Information System (INIS)

    1992-04-01

    This report is a summary of the US Department of Energy's (DOE) cultural resource investigations for the Uranium Mill Tailings Remedial Action (UMTRA) Project sites in Colorado. This report is intended to fulfill the DOE's obligation for an annual report as stated in the Programmatic Memorandum of Agreement executed between the DOE, the Advisory Council on Historic Preservation, and the Colorado State Historic Preservation Officer in December 1984. Summaries of the cultural resource surveys and identified resources are provided for the UMTRA Project sites in the vicinities of Durango, Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock. This report covers all UMTRA Project cultural resource activities in Colorado from January through December 1991

  3. Fiscal year 1996 decontamination and decommissioning activities photobriefing book for the Argonne National Laboratory-East Site, Technology Development Division, Waste Management Program, Decontamination and Decommissioning Projects Department

    International Nuclear Information System (INIS)

    1996-01-01

    The Photobriefing Book describes the Decontamination and Decommissioning (D and D) Program at the Argonne National Laboratory-East Site (ANL-E) near Lemont, Illinois. This book summarizes current D and D projects, reviews fiscal year (FY) 1996 accomplishments, and outlines FY 1997 goals. A section on D and D Technology Development provides insight on new technologies for D and D developed or demonstrated at ANL-E. Past projects are recapped and upcoming projects are described as Argonne works to accomplish its commitment to, ''Close the Circle on the Splitting of the Atom.'' Finally, a comprehensive review of the status and goals of the D and D Program is provided to give a snap-shot view of the program and the direction it's taking as it moves into FY 1997. The D and D projects completed to date include: Plutonium Fuel Fabrication Facility; East Area Surplus Facilities; Experimental Boiling Water Reactor; M-Wing Hot Cell Facilities; Plutonium Gloveboxes; and Fast Neutron Generator

  4. U.S. Department of Energy's initiatives for proliferation prevention in Russia: results of radioactive liquid waste treatment project, year 2

    International Nuclear Information System (INIS)

    Pokhitonov, Y.; Kamachev, V.; Kelley, D.

    2010-10-01

    The objective of the project is to engage weapons scientists with training and research programs at selected nuclear sites in Russia and apply high technology polymers to immobilize legacy ILW and HLW liquids that have posed environmental challenges over the years. One compelling advantage of the projects is that V.G. Khlopin Radium Institute and Pacific Nuclear Solutions have been engaged in applied research for seven years to validate the performance and effectiveness of the polymer technology for use with radioactive liquids. With conclusive results of the research work on sixty active and simulant waste streams, the project can focus on actual applications of the technology at Ozersk (Mayak), Sever sk (SCC) Zheleznogorsk (MCC) and Gatchyna rather that on pure research. The long term objective of the project is find viable waste management solutions for serious radioactive and chemical contamination that has existed in Russia and the U. S. for several decades. The polymer technologies may be applied to all radioactive liquid. This paper summarizes the experimental work of the immobilization process and data definition of the most effective polymer compositions in addition to determining the optimum polymer to liquid ratios for economic considerations. (Author)

  5. The U.S. Department of Energy pollution prevention program: Applications for small business

    Energy Technology Data Exchange (ETDEWEB)

    Betsch, M.D.

    1997-05-14

    This report shows the benefits small businesses can realize by instituting cost-effective pollution prevention improvements. It is a series of pollution prevention assessments that were conducted at small businesses in Richland, Washington. It describes a technology transfer test of US Department of Energy (USDOE) pollution prevention methods to small businesses through eleven pollution prevention assessments conducted at small businesses in the city of Richland. The assessment method tested was first developed at the USDOE Hanford Site, located in Richland, Washington. Two pilot studies were initially conducted to determine the usefulness of the assessment method for small businesses. Then, four additional pollution prevention assessments were conducted using a refined process. In order to determine the assessment method`s usefulness by different practitioners, a number of the assessments contained in this report were conducted by the undergraduate and graduate students at Washington State University at Tri-Cities as part of their class projects. These students were trained in the pollution prevention assessment process by the author of this report and conducted five small business assessments using the same methods and materials as in the remainder of the study.

  6. The U.S. Department of Energy pollution prevention program: Applications for small business

    International Nuclear Information System (INIS)

    Betsch, M.D.

    1997-01-01

    This report shows the benefits small businesses can realize by instituting cost-effective pollution prevention improvements. It is a series of pollution prevention assessments that were conducted at small businesses in Richland, Washington. It describes a technology transfer test of US Department of Energy (USDOE) pollution prevention methods to small businesses through eleven pollution prevention assessments conducted at small businesses in the city of Richland. The assessment method tested was first developed at the USDOE Hanford Site, located in Richland, Washington. Two pilot studies were initially conducted to determine the usefulness of the assessment method for small businesses. Then, four additional pollution prevention assessments were conducted using a refined process. In order to determine the assessment method's usefulness by different practitioners, a number of the assessments contained in this report were conducted by the undergraduate and graduate students at Washington State University at Tri-Cities as part of their class projects. These students were trained in the pollution prevention assessment process by the author of this report and conducted five small business assessments using the same methods and materials as in the remainder of the study

  7. Assessment of non-economic impacts to coastal recreation and tourism from oil and gas development: A review of selected literature and example-methodology. Inventory and evaluation of Washington and Oregon coastal recreation resources

    Energy Technology Data Exchange (ETDEWEB)

    Kruger, L.E.; Johnson, D.R.; Lee, R.G.

    1991-05-01

    The purpose of the study three-part was to assist Minerals Management Service (MMS) planners in evaluation of the anticipated social impact of proposed oil and gas development on the environment. The Pacific Northwest coastal areas of Washington and Oregon, widely known for their natural beauty, provide a variety of recreational opportunities for both local residents and visitors. In fact, tourism is one of the leading industries in the two states and is an important source of revenue for the economies of many coastal communities. Thus, the Department of Interior, Minerals Management Service (MMS), in anticipation of the proposed Lease Sale 132, funded the research project with the aim of adding to the existing knowledge of Oregon and Washington coastal recreation resources that might be affected by proposed oil and gas development activities.

  8. Natural phenomena analyses, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Tallman, A.M.

    1989-01-01

    Probabilistic seismic hazard studies completed for the Washington Public Power Supply System's Nuclear Plant 2 and for the US Department of Energy's N Reactor sites, both on the Hanford Site, suggested that the Lawrence Livermore National Laboratory seismic exposure estimates were lower than appropriate, especially for sites near potential seismic sources. A probabilistic seismic hazard assessment was completed for those areas that contain process and/or waste management facilities. the lower bound magnitude of 5.0 is used in the hazard analysis and the characteristics of small-magnitude earthquakes relatively common to the Hanford Site are addressed. The recommended ground motion for high-hazard facilities is somewhat higher than the Lawrence Livermore National Laboratory model and the ground motion from small-magnitude earthquakes is addressed separately from the moderate- to large-magnitude earthquake ground motion. The severe wind and tornado hazards determined for the Hanford Siste are in agreement with work completed independently using 43 years of site data. The low-probability, high-hazard, design-basis flood at the Hanford Site is dominated by dam failure on the Columbia River. Further evaluation of the mechanisms and probabilities of such flooding is in progress. The Hanford Site is downwind from several active Cascade volcanoes. Geologic and historical data are used to estimate the ashfall hazard

  9. Aerospace Training. Washington's Community and Technical Colleges

    Science.gov (United States)

    Washington State Board for Community and Technical Colleges, 2014

    2014-01-01

    Aerospace is an economic powerhouse that generates jobs and fuels our economy. Washington's community and technical colleges produce the world-class employees needed to keep it that way. With about 1,250 aerospace-related firms employing more than 94,000 workers, Washington has the largest concentration of aerospace expertise in the nation. To…

  10. A proposed framework for conducting pollution prevention design assessments (P2DAs) on U.S. Department of Energy design projects

    International Nuclear Information System (INIS)

    Dorsey, J.A.

    1995-03-01

    The purpose of this manual is to provide a framework for project managers, engineers, and designers to integrate pollution prevention principles and features into DOE design projects. The framework suggested is referred to as the pollution prevention design assessment (P2DA). The P2DA is based on DOE's method for conducting pollution prevention opportunity assessments (PPOAs) on existing waste-generating operations, but the P2DA is modified because the facility or process it assesses does not physically exist during design. Before the P2DA framework is introduced in the manual, recommendations for establishing the P2DA team and budget are provided. Specific pollution prevention requirements and opportunities for each design stage as delineated in DOE Order 4700.1 Project Management System are also discussed and a sample format for drafting a P2DA report is provided in the appendix. The scope of this manual includes not only the P2DA framework, but also a background discussion of pollution prevention and related topics; the regulatory requirements mandating design for pollution prevention; the benefits and barriers of designing for pollution prevention; and the impact that pollution prevention and related environmental avoidance concepts have had on the engineering profession

  11. Washington State biomass data book

    International Nuclear Information System (INIS)

    Deshaye, J.A.; Kerstetter, J.D.

    1991-07-01

    This is the first edition of the Washington State Biomass Databook. It assess sources and approximate costs of biomass fuels, presents a view of current users, identifies potential users in the public and private sectors, and lists prices of competing energy resources. The summary describes key from data from the categories listed above. Part 1, Biomass Supply, presents data increasing levels of detail on agricultural residues, biogas, municipal solid waste, and wood waste. Part 2, Current Industrial and Commercial Use, demonstrates how biomass is successfully being used in existing facilities as an alternative fuel source. Part 3, Potential Demand, describes potential energy-intensive public and private sector facilities. Part 4, Prices of Competing Energy Resources, shows current suppliers of electricity and natural gas and compares utility company rates. 49 refs., 43 figs., 72 tabs

  12. Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

    International Nuclear Information System (INIS)

    Grecheck, Eugene S.; Batalo, David P.

    2010-01-01

    This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

  13. 75 FR 8092 - Privacy Act of 1974; Department of Homeland Security/ALL-027 The History of the Department of...

    Science.gov (United States)

    2010-02-23

    ... Policy, U.S. Department of Homeland Security, Washington, DC 20528. For privacy issues please contact... DEPARTMENT OF HOMELAND SECURITY Office of the Secretary [Docket No. DHS-2009-0040] Privacy Act of... System of Records AGENCY: Privacy Office, DHS. ACTION: Notice of Privacy Act system of records. SUMMARY...

  14. Agricultural research department

    International Nuclear Information System (INIS)

    1989-01-01

    The annual report gives a general review of the research work of the department. The acitivities of the year are described in 4 short project reports each followed by a list of publications, posters and lectures. Further, the report gives two review articles on selected subjects related to the work: ''Pea mutants'' and ''Linkage maps''. Included in the report are also a list of the staff members, guest scientists and students, lectures given at the department, and a list of travel- and other activities. (author)

  15. ASI-Sistema Rischio Vulcanico SRV: a pilot project to develop EO data processing modules and products for volcanic activity monitoring based on Italian Civil Protection Department requirements and needs

    Science.gov (United States)

    Buongiorno, Maria Fabrizia; Musacchio, Massimo; Silvestri, Malvina; Spinetti, Claudia; Corradini, Stefano; Lombardo, Valerio; Merucci, Luca; Sansosti, Eugenio; Pugnagli, Sergio; Teggi, Sergio; Pace, Gaetano; Fermi, Marco; Zoffoli, Simona

    2007-10-01

    The Project called Sistema Rischio Vulcanico (SRV) is funded by the Italian Space Agency (ASI) in the frame of the National Space Plan 2003-2005 under the Earth Observations section for natural risks management. The SRV Project is coordinated by the Istituto Nazionale di Geofisica e Vulcanologia (INGV) which is responsible at national level for the volcanic monitoring. The objective of the project is to develop a pre-operative system based on EO data and ground measurements integration to support the volcanic risk monitoring of the Italian Civil Protection Department which requirements and need are well integrated in the GMES Emergency Core Services program. The project philosophy is to implement, by incremental versions, specific modules which allow to process, store and visualize through Web GIS tools EO derived parameters considering three activity phases: 1) knowledge and prevention; 2) crisis; 3) post crisis. In order to combine effectively the EO data and the ground networks measurements the system will implement a multi-parametric analysis tool, which represents and unique tool to analyze contemporaneously a large data set of data in "near real time". The SRV project will be tested his operational capabilities on three Italian Volcanoes: Etna,Vesuvio and Campi Flegrei.

  16. Psychiatric Boarding in Washington State and the Inadequacy of Mental Health Resources.

    Science.gov (United States)

    Bloom, Joseph D

    2015-06-01

    Psychiatric boarding is a term derived from emergency medicine that describes the holding of patients deemed in need of hospitalization in emergency departments for extended periods because psychiatric beds are not available. Such boarding has occurred for many years in the shadows of mental health care as both inpatient beds and community services have decreased. This article focuses on a 2014 Washington State Supreme Court decision that examined the interpretation of certain sections of the Washington state civil commitment statute that had been used to justify the extended boarding of detained psychiatric patients in general hospital emergency departments. The impact of this decision on the state of Washington should be significant and could spark a national debate about the negative impacts of psychiatric boarding on patients and on the nation's general hospital emergency services. © 2015 American Academy of Psychiatry and the Law.

  17. Multi-hazard Non-regulatory Risk Maps for Resilient Coastal Communities of Washington State in Pacific Northwest Region of the United States

    Science.gov (United States)

    Cakir, R.; Walsh, T. J.; Zou, Y.; Gufler, T.; Norman, D. K.

    2015-12-01

    Washington Department of Natural Resources - Division of Geology and Earth Resources (WADNR-DGER) partnered with FEMA through the FEMA Cooperating Technical Partners (CTP) program to assess annualized losses from flood and other hazards and prepare supportive risk related data for FEMA's coastal RiskMAP projects. We used HAZUS-MH analysis to assess losses from earthquake, flood and other potential hazards such as landslide and tsunami in the project areas; on shorelines of the Pacific Ocean and Puget Sound of Washington Grays Harbor, Pacific, Skagit, Whatcom, Island, Mason, Clallam, Jefferson and San Juan counties. The FEMA's Hazus-MH tool was applied to estimate losses and damages for each building due to floods and earthquakes. User-defined facilities (UDF) inventory data were prepared and used for individual building damage estimations and updating general building stocks. Flood depth grids were used to determine which properties are most impacted by flooding. For example, the HAZUS-MH (flood model) run based on the 1% annual chance event (or 100 year flood) for Grays Harbor County, resulted in a total of 161 million in losses to buildings including residential, commercial properties, and other building and occupancy types. A likely M9 megathrust Cascadia earthquake scenario USGS-ShakeMap was used for the HAZUS-MH earthquake model. For example, the HAZUS-MH (earthquake model) run based on the Cascadia M9 earthquake for Grays Harbor County, resulted in a total of 1.15 billion in losses to building inventory. We produced GIS-based overlay maps of properties exposed to tsunami, landslide, and liquefaction hazards within the communities. This multi-hazard approach is an essential component to produce non-regulatory maps for FEMA's RiskMAP project, and they help further improve local and regional mitigation efforts and emergency response plans, and overall resiliency plan of the communities in and around the coastal communities in western Washington.

  18. Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Eugene S. Grecheck

    2010-11-30

    This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

  19. Harness: Heterogeneous Adaptable Reconfigurable Networked Systems -- U.S. Department of Energy Grant DE-FG02-99ER25379 Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Vaidy Sunderam

    2003-07-02

    Issues in reconfigurability and adaptability in heterogeneous distributed systems for high-performance computing are the focus of the work funded by this grant. Our efforts are part of an ongoing research project in metacomputing and are a follow on to the DOE funded PVM system that has witnessed over a decade of use at numerous institutions worldwide. The current project, termed Harness, investigates novel methodologies and tools for distributed metacomputing, focusing on dynamically reconfigurable software frameworks. During the first phase, we defined the metacomputing architecture embodied in Harness and developed prototype subsystems as proof of concept exercises. Subsequently, we designed and developed a complete software framework manifesting the Harness architecture, and also developed several tools and subsystems that demonstrated the viability and effectiveness of our proposed model for next generation metacomputing. We then used this substrate to emulate multiple programming environments on Harness, and conducted performance evaluation and tuning exercises. The main research results from these efforts include the establishment of software metacomputing systems as viable and cost-effective alternatives to MPPs; the demonstration of dynamic and reconfigurable platforms as effective methods of tailoring parallel computing environments; the development of methodologies to construct plugin modules for component-based distributed systems; contributions to performance modeling and optimization in emulated software environments; and software architectures for multi- and mixed-paradigm parallel distributed computing. Details and specifics on these and other results have been reported in numerous publications, and are manifested in software systems, all of which may be accessed at or via the website http://www.mathcs.emory.edu/harness/

  20. Strategic Environmental Research and Development Project FY 1994: Assessing national remote sensing technologies for use in US Department of Energy Environmental Restoration Activities, Oak Ridge Solid Waste Storage Area 4 case study

    International Nuclear Information System (INIS)

    King, A.L.; Smyre, J.L.; Evers, T.K.

    1995-02-01

    During FY 1994, the Oak Ridge Environmental Restoration (ER) Remote Sensing Program teamed with members of the Oak Ridge National Security Program Office (NSPO), the Environmental Research Institute of Michigan (ERIM) under contract to the National Exploitation Laboratory (NEL), the Oak Ridge Waste Area Group 4 (WAG 4) ER Program, and the US Department of Energy (DOE), Offices of Technology Development, Nonproliferation and National Security, and Environmental Restoration, to conduct a test and demonstration of the uses of national remote sensing technologies at DOE hazardous waste sites located in Oak Ridge, Tennessee. Objectives of the Oak Ridge study were to determine if national remote sensing technologies are useful in conducting prescreening, characterization, and/or monitoring activities to expedite the clean-up process at hazardous waste sites and to cut clean-up costs wherever possible. This project was sponsored by the Strategic Environmental Research and Development Project (SERDP)

  1. 78 FR 75560 - Biofuels Washington LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Science.gov (United States)

    2013-12-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER14-506-000] Biofuels Washington LLC; Supplemental Notice That Initial Market- Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding, of Biofuels...

  2. 75 FR 28685 - Oritani Financial Corp., MHC, Township of Washington, NJ; Approval of Conversion Application

    Science.gov (United States)

    2010-05-21

    ... DEPARTMENT OF THE TREASURY Office of Thrift Supervision [AC-39: OTS Nos. H-2944 and H-4701... hereby given that on May 10, 2010, the Office of Thrift Supervision approved the application of Oritani Financial Corp., MHC, and Oritani Bank, Township of Washington, New Jersey, to convert to the stock form of...

  3. Climate change vulnerability and adaptation in the North Cascades region, Washington

    Science.gov (United States)

    Crystal L. Raymond; David L. Peterson; Regina M. Rochefort

    2014-01-01

    The North Cascadia Adaptation Partnership (NCAP) is a science-management partnership consisting of the U.S. Department of Agriculture Forest Service Mount Baker-Snoqualmie and Okanogan-Wenatchee National Forests and Pacific Northwest Research Station; North Cascades National Park Complex; Mount Rainier National Park; and University of Washington Climate Impacts Group....

  4. 76 FR 27848 - Pears Grown in Oregon and Washington; Amendment To Allow Additional Exemptions

    Science.gov (United States)

    2011-05-13

    ... marketing order for Oregon-Washington pears that provides for the sale of fresh pears directly to consumers...' markets. These consumer-direct sales are exempt from the marketing order's assessment, reporting, handling... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 927 [Doc. No. AMS-FV-10-0072...

  5. 78 FR 78311 - Approval and Promulgation of Implementation Plans; Washington: Kent, Seattle, and Tacoma Second...

    Science.gov (United States)

    2013-12-26

    ... Amendments. The Washington Department of Ecology (Ecology) and the Puget Sound Clean Air Agency (PSCAA... prohibition on open burning, and industrial emission controls. These control measures were highly successful with monitoring data showing Kent, Seattle, and Tacoma meeting the PM 10 NAAQS since 1987, 1990, and...

  6. 78 FR 24981 - Irish Potatoes Grown in Washington; Decreased Assessment Rate

    Science.gov (United States)

    2013-04-29

    ... Reform. Under the marketing order now in effect, Washington potato handlers are subject to assessments... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 946 [Doc. No. AMS-FV-13-0010... Marketing Service, USDA. ACTION: Interim rule with request for comments. SUMMARY: This rule decreases the...

  7. 77 FR 30902 - Partial Approval and Promulgation of Implementation Plans; Washington: Infrastructure...

    Science.gov (United States)

    2012-05-24

    ... reservation, (2) all dependent Indian communities within the borders of the United States, whether within the...- of-way running through the same. Under this definition, EPA treats as reservations trust lands.... On January 24, 2012, Washington Department of Ecology submitted a certification to address the...

  8. 78 FR 14951 - State of Washington; Underground Injection Control (UIC) Program Revision

    Science.gov (United States)

    2013-03-08

    ... EPA Docket Center homepage at http://www.epa.gov/epahome/dockets.htm or the SUPPLEMENTARY INFORMATION... Agency, Region 10, Library, 10th Floor, 1200 Sixth Avenue, Seattle, WA 98101. The Library is open from 9... telephone number for the Library is (206) 553-1289. (2) Washington Department of Ecology, Water Quality...

  9. 76 FR 40617 - Security Zone; 2011 Seattle Seafair Fleet Week Moving Vessels, Puget Sound, Washington

    Science.gov (United States)

    2011-07-11

    ... better evaluate its effects on them and participate in the rulemaking process. Small businesses may send... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2011-0505] RIN 1625-AA87 Security Zone; 2011 Seattle Seafair Fleet Week Moving Vessels, Puget Sound, Washington AGENCY...

  10. HYDROLOGY, WASHINGTON COUNTY, WI, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Hydrology data include spatial datasets and data tables necessary for documenting the hydrologic procedures for estimating flood discharges for a flood insurance...

  11. TERRAIN, WASHINGTON COUNTY, KENTUCKY USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Terrain data, as defined in FEMA Guidelines and Specifications, Appendix N: Data Capture Standards, describes the digital topographic data that was used to create...

  12. TERRAIN, WASHINGTON COUNTY, Ohio USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Terrain data, as defined in FEMA Guidelines and Specifications, Appendix M: Data Capture Standards, describes the digital topographic data that was used to create...

  13. ORTHOIMAGERY, CLARK COUNTY, WASHINGTON, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — This data set contains imagery from the National Agricultural Imagery Program (NAIP). NAIP acquires digital ortho imagery during the agricultural growing seasons in...

  14. BASEMAP, WASHINGTON COUNTY, FL, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — FEMA Framework Basemap datasets comprise six of the seven FGDC themes of geospatial data that are used by most GIS applications (Note: the seventh framework theme,...

  15. BASEMAP, KITSAP COUNTY, WASHINGTON, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — FEMA Framework Basemap datasets comprise six of the seven FGDC themes of geospatial data that are used by most GIS applications (Note: the seventh framework theme,...

  16. SURVEY, WASHINGTON COUNTY, FL, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Survey data includes spatial datasets and data tables necessary to digitally represent data collected in the survey phase of the study. (Source: FEMA Guidelines and...

  17. HYDROLOGY, WASHINGTON COUNTY, FL, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Hydrology data include spatial datasets and data tables necessary for documenting the hydrologic procedures for estimating flood discharges for a flood insurance...

  18. 2015 State Geodatabase for Washington

    Data.gov (United States)

    US Census Bureau, Department of Commerce — The 2015 TIGER Geodatabases are extracts of selected nation based and state based geographic and cartographic information from the U.S. Census Bureau's Master...

  19. Bibliography of the geology of the Columbia Basin and surrounding areas of Washington

    International Nuclear Information System (INIS)

    Tucker, G.B.; Rigby, J.G.

    1979-07-01

    In the fall of 1977, the Washington State Department of Natural Resources, Division of Geology and Earth Resources (WDGER), entered into a contract with the US Department of Energy, administered by Rockwell Hanford Operations (Rockwell) in Richland, Washington, as a principal contributor to a geologic study of feasibility of storing radioactive waste within Columbia River basalt. WDGER's responsibility was the production of this bibliography and a reconnaissance geologic map of the sediments overlying the Columbia River Basalt Group in the State of Washington. This bibliography is a compilation of all known published, unpublished, and open-file references dealing with geology and geophysics of the Columbia Basin of eastern Washington. The citations were obtained primarily from the WDGER and Washington State libraries; the Geo-Ref bibliographic system was also utilized. Because the WDGER portion of the study included preparation of a reconnaissance geologic map of surficial deposits in the Columbia Basin, available references dealing with this subject have been annotated. Many abstracts in the annotated section are quotations and have been copied directly from their respective publications

  20. Bibliography of the geology of the Columbia Basin and surrounding areas of Washington

    Energy Technology Data Exchange (ETDEWEB)

    Tucker, G.B.; Rigby, J.G.

    1979-07-01

    In the fall of 1977, the Washington State Department of Natural Resources, Division of Geology and Earth Resources (WDGER), entered into a contract with the US Department of Energy, administered by Rockwell Hanford Operations (Rockwell) in Richland, Washington, as a principal contributor to a geologic study of feasibility of storing radioactive waste within Columbia River basalt. WDGER's responsibility was the production of this bibliography and a reconnaissance geologic map of the sediments overlying the Columbia River Basalt Group in the State of Washington. This bibliography is a compilation of all known published, unpublished, and open-file references dealing with geology and geophysics of the Columbia Basin of eastern Washington. The citations were obtained primarily from the WDGER and Washington State libraries; the Geo-Ref bibliographic system was also utilized. Because the WDGER portion of the study included preparation of a reconnaissance geologic map of surficial deposits in the Columbia Basin, available references dealing with this subject have been annotated. Many abstracts in the annotated section are quotations and have been copied directly from their respective publications.

  1. Report on Department of Homeland Security Sponsored Research Project at Lawrence Livermore National Laboratory on Preparation for an Improvised Nuclear Device Event

    Energy Technology Data Exchange (ETDEWEB)

    A., B

    2008-07-31

    Following the events of September 11th, a litany of imaginable horribles was trotted out before an anxious and concerned public. To date, government agencies and academics are still grappling with how to best respond to such catastrophes, and as Senator Lieberman's quote says above, now is the time to plan and prepare for such events. One of the nation's worst fears is that terrorists might detonate an improvised nuclear device (IND) in an American city. With 9/11 serving as the catalyst, the government and many NGOs have invested money into research and development of response capabilities throughout the country. Yet, there is still much to learn about how to best respond to an IND event. My summer 2008 internship at Lawrence Livermore National Laboratory afforded me the opportunity to look in depth at the preparedness process and the research that has been conducted on this issue. While at the laboratory I was tasked to collect, combine, and process research on how cities and the federal government can best prepare for the horrific prospect of an IND event. Specific projects that I was involved with were meeting reports, research reviews, and a full project report. Working directly with Brooke Buddemeier and his support team at the National Atmospheric Release Advisory Center, I was able to witness first hand, preparation for meetings with response planners to inform them of the challenges that an IND event would pose to the affected communities. In addition, I supported the Homeland Security Institute team (HSI), which was looking at IND preparation and preparing a Congressional report. I participated in meetings at which local responders expressed their concerns and contributed valuable information to the response plan. I specialized in the psycho-social aspects of an IND event and served as a technical advisor to some of the research groups. Alongside attending and supporting these meetings, I worked on an independent research project which collected

  2. Report on Department of Homeland Security Sponsored Research Project at Lawrence Livermore National Laboratory on Preparation for an Improvised Nuclear Device Event

    International Nuclear Information System (INIS)

    Bentz, A.

    2008-01-01

    Following the events of September 11th, a litany of imaginable horribles was trotted out before an anxious and concerned public. To date, government agencies and academics are still grappling with how to best respond to such catastrophes, and as Senator Lieberman's quote says above, now is the time to plan and prepare for such events. One of the nation's worst fears is that terrorists might detonate an improvised nuclear device (IND) in an American city. With 9/11 serving as the catalyst, the government and many NGOs have invested money into research and development of response capabilities throughout the country. Yet, there is still much to learn about how to best respond to an IND event. My summer 2008 internship at Lawrence Livermore National Laboratory afforded me the opportunity to look in depth at the preparedness process and the research that has been conducted on this issue. While at the laboratory I was tasked to collect, combine, and process research on how cities and the federal government can best prepare for the horrific prospect of an IND event. Specific projects that I was involved with were meeting reports, research reviews, and a full project report. Working directly with Brooke Buddemeier and his support team at the National Atmospheric Release Advisory Center, I was able to witness first hand, preparation for meetings with response planners to inform them of the challenges that an IND event would pose to the affected communities. In addition, I supported the Homeland Security Institute team (HSI), which was looking at IND preparation and preparing a Congressional report. I participated in meetings at which local responders expressed their concerns and contributed valuable information to the response plan. I specialized in the psycho-social aspects of an IND event and served as a technical advisor to some of the research groups. Alongside attending and supporting these meetings, I worked on an independent research project which collected

  3. PROJECTIZING AN OPERATING NUCLEAR FACILITY

    International Nuclear Information System (INIS)

    Adams, N

    2007-01-01

    This paper will discuss the evolution of an operations-based organization to a project-based organization to facilitate successful deactivation of a major nuclear facility. It will describe the plan used for scope definition, staff reorganization, method estimation, baseline schedule development, project management training, and results of this transformation. It is a story of leadership and teamwork, pride and success. Workers at the Savannah River Site's (SRS) F Canyon Complex (FCC) started with a challenge--take all the hazardous byproducts from nearly 50 years of operations in a major, first-of-its-kind nuclear complex and safely get rid of them, leaving the facility cold, dark, dry and ready for whatever end state is ultimately determined by the United States Department of Energy (DOE). And do it in four years, with a constantly changing workforce and steadily declining funding. The goal was to reduce the overall operating staff by 93% and budget by 94%. The facilities, F Canyon and its adjoined sister, FB Line, are located at SRS, a 310-square-mile nuclear reservation near Aiken, S.C., owned by DOE and managed by Washington Group International subsidiary Washington Savannah River Company (WSRC). These facilities were supported by more than 50 surrounding buildings, whose purpose was to provide support services during operations. The radiological, chemical and industrial hazards inventory in the old buildings was significant. The historical mission at F Canyon was to extract plutonium-239 and uranium-238 from irradiated spent nuclear fuel through chemical processing. FB Line's mission included conversion of plutonium solutions into metal, characterization, stabilization and packaging, and storage of both metal and oxide forms. The plutonium metal was sent to another DOE site for use in weapons. Deactivation in F Canyon began when chemical separations activities were completed in 2002, and a cross-functional project team concept was implemented to successfully

  4. Reproductive Ecology of Yakima River Hatchery and Wild Spring Chinook; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2005-2006 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Knedsen, Curtis M. (Oncorh Consulting, Olympia, WA); Schroder, Steven L. (Washington Department of Fish and Wildlife, Olympia, WA); Johnston, Mark V. (Yakama Nation, Toppenish, WA)

    2006-05-01

    This report covers three of many topics under the Yakima/Klickitat Fisheries Project's Monitoring and Evaluation Program (YKFPME) and was completed by Oncorh Consulting as a contract deliverable to the Yakama Nation and Washington Department of Fish and Wildlife. The YKFPME (Project Number 1995-063-25) is funded under two BPA contracts, one for the Yakama Nation (Contract No. 00022449) and the other for the Washington Department of Fish and Wildlife (Contract No. 22370). A comprehensive summary report for all of the monitoring and evaluation topics will be submitted after all of the topical reports are completed. This approach to reporting enhances the ability of people to get the information they want, enhances timely reporting of results, and provides a condensed synthesis of the whole YKFPME.

  5. Report : public transportation in Washington State, 1984

    Science.gov (United States)

    1984-10-01

    This report is an update of the Public Transportation in Washington State publication, dated December 1981. In order to reflect the changes that have occurred since that time, this report contains the most current data obtainable. Chapter One of this...

  6. Timber resource statistics for southwest Washington.

    Science.gov (United States)

    Patricia M. Bassett; Daniel D. Oswald

    1981-01-01

    This report summarizes a 1978 timber-resource inventory of six counties in southwest Washington: Clark, Cowlitz, Lewis, Pacific, Skamania, and Wahkiakum. Detailed tables of forest area, timber volume, growth, mortality, and harvest are presented.

  7. Timber resource statistics for eastern Washington.

    Science.gov (United States)

    Patricia M. Bassett; Daniel D. Oswald

    1983-01-01

    This report summarizes a 1980 timber resource inventory of the 16 forested counties in Washington east of the crest of the Cascade Range. Detailed tables of forest area, timber volume, growth, mortality, and harvest are presented.

  8. NSA Diana Wueger Published in Washington Quarterly

    OpenAIRE

    Grant, Catherine L.

    2016-01-01

    National Security Affairs (NSA) News NSA Faculty Associate for Research Diana Wueger has recently had an article titled “India’s Nuclear-Armed Submarines: Deterrence or Danger?” published in the Washington Quarterly.

  9. Occurrence, distribution, and transport of pesticides in agricultural irrigation-return flow from four drainage basins in the Columbia Basin Project, Washington, 2002-04, and comparison with historical data

    Science.gov (United States)

    Wagner, Richard J.; Frans, Lonna M.; Huffman, Raegan L.

    2006-01-01

    Water-quality samples were collected from sites in four irrigation return-flow drainage basins in the Columbia Basin Project from July 2002 through October 2004. Ten samples were collected throughout the irrigation season (generally April through October) and two samples were collected during the non-irrigation season. Samples were analyzed for temperature, pH, specific conductance, dissolved oxygen, major ions, trace elements, nutrients, and a suite of 107 pesticides and pesticide metabolites (pesticide transformation products) and to document the occurrence, distribution, and pesticides transport and pesticide metabolites. The four drainage basins vary in size from 19 to 710 square miles. Percentage of agricultural cropland ranges from about 35 percent in Crab Creek drainage basin to a maximum of 75 percent in Lind Coulee drainage basin. More than 95 percent of cropland in Red Rock Coulee, Crab Creek, and Sand Hollow drainage basins is irrigated, whereas only 30 percent of cropland in Lind Coulee is irrigated. Forty-two pesticides and five metabolites were detected in samples from the four irrigation return-flow drainage basins. The most compounds detected were in samples from Sand Hollow with 37, followed by Lind Coulee with 33, Red Rock Coulee with 30, and Crab Creek with 28. Herbicides were the most frequently detected pesticides, followed by insecticides, metabolites, and fungicides. Atrazine, bentazon, diuron, and 2,4-D were the most frequently detected herbicides and chlorpyrifos and azinphos-methyl were the most frequently detected insecticides. A statistical comparison of pesticide concentrations in surface-water samples collected in the mid-1990s at Crab Creek and Sand Hollow with those collected in this study showed a statistically significant increase in concentrations for diuron and a statistically significant decrease for ethoprophos and atrazine in Crab Creek. Statistically significant increases were in concentrations of bromacil, diuron, and

  10. THE PROPOSED NATIONAL ARBORETUM AT WASHINGTON.

    Science.gov (United States)

    Coville, F V

    1925-12-25

    Nature. The proposed national arboretum at Washington would contain a permanent living collection of trees and other outdoor plants for purposes of scientific research and education. It would include the trees, shrubs, and perennials used in forestry and horticulture, and the wild relatives of these plants. It would be a bureau of standards for horticulture. It would contain a water garden and a wildrice preserve, and it would serve incidentally as a bird sanctuary. Economic value. The arboretum would make the work of the Department of Agriculture more valuable to the country in many ways, but especially through plant breeding. The development of faster-growing timber trees, improved fruits, and disease-resistant plants generally, through the facilities afforded by the arboretum, would increase profoundly the agricultural wealth and welfare of the United States. Location. The Mount Hamilton and Hickey Hill tracts in the District of Columbia, together with the Anacostia River flats above Benning Bridge, constitute an admirable site for the arboretum, convenient in location and with a great variety of soils. Cost. About 400 acres of the proposed site is already owned by the government. It consists of marsh land, about to be drained by army engineers. The Mount Hamilton and Hickey Hill area, 408 acres, privately owned, was reported by the assessor in January, 1925, to be valued at $343,048, distributed among thirty owners. Maintenance. If the purchase of the Mount Hamilton and Hickey Hill tracts in the fiscal year 1927 is authorized, it is estimated that the cost of maintenance of the arboretum for the first three years would be as follows: 1927. Nothing 1928. $25,000 1929. $50,000.

  11. Recovery Act: Federspiel Controls (now Vigilent) and State of California Department of General Services Data Center Energy Efficient Cooling Control Demonstration. Final technical project report

    Energy Technology Data Exchange (ETDEWEB)

    Federspiel, Clifford; Evers, Myah

    2011-09-30

    Eight State of California data centers were equipped with an intelligent energy management system to evaluate the effectiveness, energy savings, dollar savings and benefits that arise when powerful artificial intelligence-based technology measures, monitors and actively controls cooling operations. Control software, wireless sensors and mesh networks were used at all sites. Most sites used variable frequency drives as well. The system dynamically adjusts temperature and airflow on the fly by analyzing real-time demands, thermal behavior and historical data collected on site. Taking into account the chaotic interrelationships of hundreds to thousands of variables in a data center, the system optimizes the temperature distribution across a facility while also intelligently balancing loads, outputs, and airflow. The overall project will provide a reduction in energy consumption of more than 2.3 million kWh each year, which translates to $240,000 saved and a reduction of 1.58 million pounds of carbon emissions. Across all sites, the cooling energy consumption was reduced by 41%. The average reduction in energy savings across all the sites that use VFDs is higher at 58%. Before this case study, all eight data centers ran the cooling fans at 100% capacity all of the time. Because of the new technology, cooling fans run at the optimum fan speed maintaining stable air equilibrium while also expending the least amount of electricity. With lower fan speeds, the life of the capital investment made on cooling equipment improves, and the cooling capacity of the data center increases. This case study depicts a rare technological feat: The same process and technology worked cost effectively in eight very different environments. The results show that savings were achieved in centers with diverse specifications for the sizes, ages and types of cooling equipment. The percentage of cooling energy reduction ranged from 19% to 78% while keeping temperatures substantially within the

  12. Annual report 1987 Materials Department

    International Nuclear Information System (INIS)

    1989-01-01

    Review of the activities performed by the Materials Department of the National Atomica Energy Commission of the Argentine Republic during the year 1987. The Department provides services and assistance in all matters related to metallography and special techniques, corrosion and materials' transport, transport phenomena, casting and solidification, damage by radiation, thermomechanical treatments, mechanical properties, fatigue and fracture, multinational project of research and development in materials, VII course on metallurgy and technology of materials. Likewise, information on the Materials Department's staff, its publications, projects and agreements, seminars, courses and conferences during 1987 is included [es

  13. CTD cast data collected in Dabob Bay, Hood Canal, Puget Sound, Washington during eight cruises aboard the CLIFFORD A. BARNES, May 2006 - April 2008 (NODC Accession 0041970)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This dataset contains raw and processed CTD cast data collected during eight cruises to Dabob Bay, Washington in 2006 - 2008. Data were collected on one CTD cast per...

  14. Salinity and water temperature data from the Coastal Waters of Washington/Oregon from 01 March 2001 to 31 December 2001 (NODC Accession 0001142)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Salinity and water temperature data were collected using conductivity sensor and temperature probe in the Coastal Waters of Washington/Orgen from March 1, 2001 to...

  15. Capture and resight data of California sea lions in Washington State, 1989-02-15 to 2006-06-01 (NCEI Accession 0146259)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This dataset contains data from the capture and recapture of over 1500 male California sea lions (Zalophus californianus) from Washington between 1989-2006. The data...

  16. NCCOS Assessment: Predictive Mapping of Seabirds, Pinnipeds and Cetaceans off the Pacific Coast of Washington from 1995-07-21 to 2015-12-08 (NCEI Accession 0148762)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data collection comprises seasonal distribution maps and model outputs of selected seabird, pinniped and cetacean species off the Pacific coast of Washington....

  17. Sampling for Paralytic Shellfish Poisoning in commercial and recreational shellfish areas in Washington state marine waters, 1957 - 1988 (NODC Accession 0000597)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The state of Washington routinely experiences seasonal restrictions on commercial and recreational shellfish harvest due to two toxic phytoplankton syndromes,...

  18. Sampling for Paralytic Shellfish Poisoning in commercial and recreational shellfish areas in Washington state marine waters, January - December 2000 (NODC Accession 0000559)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The state of Washington routinely experiences seasonal restrictions on commercial and recreational shellfish harvest due to two toxic phytoplankton syndromes,...

  19. Sensitivity of Coastal Environments and Wildlife to Spilled Oil: Puget Sound and Strait of Juan de Fuca, Washington: SOCECON (Socioeconomic Resource Points and Lines)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains points that represent the following sensitive human-use socioeconomic sites in Puget Sound and the Strait of Juan de Fuca, Washington: access...

  20. EFH Conservation Areas off Washington, Oregon, and California for NMFS' Final Rule Implementing Amendment 19 to the Pacific Coast Groundfish Fishery Management Plan

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — These data depict Essential Fish Habitat (EFH) conservation areas off Washington, Oregon, and California. The coordinate locations are from NMFS' Final Rule to...

  1. Sensitivity of Coastal Environments and Wildlife to Spilled Oil: Puget Sound and Strait of Juan de Fuca, Washington: HABITATS (Habitat Polygons)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains sensitive biological resource data for marine and estuarine vegetation in Puget Sound and Strait of Juan de Fuca, Washington. Vector polygons...

  2. Sensitivity of Coastal Environments and Wildlife to Spilled Oil: Puget Sound and Strait of Juan de Fuca, Washington: FISHL (Fish Lines)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains sensitive biological resource data for marine, estuarine, and anadromous fish in Puget Sound and Strait of Juan de Fuca, Washington. Vector...

  3. Sensitivity of Coastal Environments and Wildlife to Spilled Oil: Puget Sound and Strait of Juan de Fuca, Washington: MGT (Management Area Polygons)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains polygons that represent the following sensitive human-use management areas in Puget Sound and the Strait of Juan de Fuca, Washington:...

  4. Zooplankton data collected from unidentified platforms in Coastal Waters of Washington / Oregon; 22 May 1979 to 06 August 1980 (NODC Accession 9800143)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Zooplankton data were collected using zooplankton net and bottle casts in Coastal Waters of Washington / Oregon from unidentified platforms from Canada. Data were...

  5. Annual coded wire tag program (Washington) missing production groups: annual report for 1997; ANNUAL

    International Nuclear Information System (INIS)

    Byrne, J.; Fuss, H.; Ashbrook, C.

    1998-01-01

    The Bonneville Power Administration (BPA) funds the ''Annual Coded Wire Tag Program - Missing Production Groups for Columbia River Hatcheries'' project. The Washington Department of Fish and Wildlife (WDFW), Oregon Department of Fish and Wildlife (ODFW) and the United States Fish and Wildlife Service (USFWS) all operate salmon and steelhead rearing programs in the Columbia River basin. The intent of the funding is to coded-wire tag at least one production group of each species at each Columbia Basin hatchery to provide a holistic assessment of survival and catch distribution over time and to meet various measures of the Northwest Power Planning Councils (NWPPC) Fish and Wildlife Program. The WDFW project has three main objectives: (1) coded-wire tag at least one production group of each species at each Columbia Basin hatchery to enable evaluation of survival and catch distribution over time, (2) recover coded-wire tags from the snouts of fish tagged under objective 1 and estimate survival, contribution, and stray rates for each group, and (3) report the findings under objective 2 for all broods of chinook, and coho released from WDFW Columbia Basin hatcheries. Objective 1 for FY-97 was met with few modifications to the original FY-97 proposal. Under Objective 2, snouts containing coded-wire tags that were recovered during FY-97 were decoded. Under Objective 3, survival, contribution and stray rate estimates for the 1991-96 broods of chinook and 1993-96 broods of coho have not been made because recovery data for 1996-97 fisheries and escapement are preliminary. This report summarizes recovery information through 1995

  6. Numerical modeling of ground-water flow systems in the vicinity of the reference repository location, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Davis, P.; Beyeler, W.; Logsdon, M.; Coleman, N.; Brinster, K.

    1989-04-01

    This report documents south-central Washington State's Pasco Basin ground-water modeling studies. This work was done to support the NRC's review of hydrogeologic studies under the Department of Energy's (DOE) Basalt Waste Isolation Project. The report provides a brief overview of the geology, hydrology, and hydrochemistry of the Pasco Basin as a basis for the evaluation of previous conceptual and numerical ground-water flow models of the region. Numerical models were developed to test new conceptual models of the site and to provide a means of evaluating the Department of Energy's performance assessments and proposed hydrologic testing. Regional ground-water flow modeling of an area larger than the Pasco Basin revealed that current concepts on the existence and behavior of a hydrologic barrier west of the proposed repository location are inconsistent with available data. This modeling also demonstrated that the measured pattern of hydraulic heads cannot be produced with a model that (1) has uniform layer properties over the entire domain; (2) has zones of large conductivity associated with anticlinal structures; or (3) includes recharge from the industrial disposal ponds. Adequate representation of the measured hydraulic heads was obtained with a model that contained regions of larger hydraulic conductivity that corresponded to the presence of sedimentary interbeds. In addition, a detailed model of a region smaller than the Pasco Basin was constructed to provide the NRC staff with the ability to analyze proposed Department of Energy hydrologic tests. 62 refs., 145 figs., 18 tabs

  7. 6th July 2010 - United Kingdom Science and Technology Facilities Council W. Whitehorn signing the guest book with Head of International relations F. Pauss, visiting the Computing Centre with Information Technology Department Head Deputy D. Foster, the LHC superconducting magnet test hall with Technology Department P. Strubin,the Centre Control Centre with Operation Group Leader M. Lamont and the CLIC/CTF3 facility with Project Leader J.-P. Delahaye.

    CERN Multimedia

    Teams : M. Brice, JC Gadmer

    2010-01-01

    6th July 2010 - United Kingdom Science and Technology Facilities Council W. Whitehorn signing the guest book with Head of International relations F. Pauss, visiting the Computing Centre with Information Technology Department Head Deputy D. Foster, the LHC superconducting magnet test hall with Technology Department P. Strubin,the Centre Control Centre with Operation Group Leader M. Lamont and the CLIC/CTF3 facility with Project Leader J.-P. Delahaye.

  8. Emergency Department Sickle Cell Assessment of Needs and Strengths (ED-SCANS), a Focus Group and Decision Support Tool Development Project

    Science.gov (United States)

    Tanabe, Paula; Reddin, Christopher; Thornton, Victoria L.; Todd, Knox H.; Wun, Ted; Lyons, John S.

    2010-01-01

    Objectives A decision support tool may guide emergency clinicians in recognizing assessment, analgesic and overall management, and health service delivery needs for patients with sickle cell disease (SCD) in the emergency department (ED). We aimed to identify data and process elements important in making decisions regarding evaluation and management of adult patients in the ED with painful episodes of sickle cell disease. Methods Qualitative methods using a series of focus groups and grounded theory were used. Eligible participants included adult clients with SCD, and emergency physicians and nurses with a minimum of one year of experience providing care to patients with SCD in the ED. Patients were recruited in conjunction with annual SCD meetings, and providers included clinicians who were and were not affiliated with sickle cell centers. Groups were conducted until saturation was reached, and included a total of two patient groups, three physician groups, and two nurse groups. Focus groups were held in New York, Durham, Chicago, New Orleans, and Denver. Clinician participants were asked the following three questions to guide the discussion: 1) what information would be important to know about patients with SCD in the ED setting to effectively care for them and help you identify patient analgesic, treatment, and referral needs? 2) what treatment decisions would you make with this information? and 3) what characteristics would a decision support tool need to have to make it meaningful and useful? Client participants were asked the same questions with re-wording to reflect what they believed providers should know to provide the best care, and what they should do with the information. All focus groups were audio taped and transcribed. The constant comparative method was used to analyze the data. Two coders independently coded participant responses and identified focal themes based on the key questions. An investigator and assistant independently reviewed the

  9. A comparison of operational performance : Washington state ferries to ferry operators worldwide.

    Science.gov (United States)

    2010-06-01

    This project compares eight measures of performance related to transit service quality (e.g. trip reliability, on-time departures) and cost-efficiency (e.g. farebox recovery, subsidy per passenger) between Washington State Ferries (WSF) and 23 ferry ...

  10. Sidwell Friends Quaker School, Washington, DC, by KieranTimberlake Architects

    DEFF Research Database (Denmark)

    Vibæk, Kasper Sánchez; Stylsvig Madsen, Ulrik

    2012-01-01

    In 2006 the new Middle School Building on the campus of Sidwell Friends School in Washington DC was completed at a cost of $28 million. The project is a renovation and addition to a fifty-year-old educational facility transforming the building and the surrounding landscape into a green expression...

  11. RCRA facility investigation/corrective measures study work plan for the 100-HR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-3 operable unit. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Source operable units include facilities and unplanned release sites that are potential sources of contamination. Separate work plans have been initiated for the 100-DR-1 (DOE-RL 1992a) and 100-HR-1 (DOE-RL 1992b) source operable units

  12. Remedial investigation/feasibility study work plan for the 100-BC-5 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-04-01

    Four areas of the Hanford Site (the 100, 200, 300 and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plant and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  13. Remedial investigation/feasibility study work plan for the 100-KR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-1 operable unit. The 100-KR-1 source operable unit is one of three source operable units in the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination

  14. Department of Zoology, Fac

    African Journals Online (AJOL)

    USER

    2015-01-07

    Jan 7, 2015 ... flowers located between the trees) which is drier forms a ... (moist and deciduous forest); and Ilorin is in the northern ..... Washington D. C. (Conservation. International) ... Amphibians of Eastern and Central. North America, 3 rd.

  15. 1Department of

    African Journals Online (AJOL)

    USER

    2017-02-16

    Feb 16, 2017 ... Nigeria, Jericho Hills P.M.B, 5054 Ibadan, Oyo State, Nigeria ... encouraged to ensure that tree crop farming and hunting are ..... Degraded Forests in Eastern. Africa: ... dry deciduous forest of Northern ... Washington, DC: WRI.

  16. Better Jobs, Brighter Futures, a Stronger Washington. Washington's Community and Technical Colleges

    Science.gov (United States)

    Washington State Board for Community and Technical Colleges, 2015

    2015-01-01

    The world is changing rapidly. With changes in technology, demographics, and workforce trends, Washington needs colleges to not only keep pace, but lead the way. Washington's 34 community and technical colleges answer that call. The community and technical colleges have proven uniquely positioned to adapt to, embrace, and ignite change. Community…

  17. Nonproliferation Education at the University of Washington

    International Nuclear Information System (INIS)

    Jones, Chris D.; Leek, K.M.

    2006-01-01

    The nonproliferation curriculum at the University of Washington (UW) is the product of collaboration between Pacific Northwest Center for Global Security (PNWCGS) at the Pacific Northwest National Laboratory (PNNL) and the Jackson School of International Studies (JSIS) and Department of Political Science at the University of Washington. This collaboration began in 2001 with the establishment the Institute for Global and Regional Security Studies (IGRSS). IGRSS is housed in the Jackson School, which will celebrate its centenary in 2008 as a center for the study of world regions. PNNL also engages in a number of collaborative relationships with UW units in the natural and applied sciences. The principal goal of IGRSS has been to develop courses that draw graduates and undergraduates into careers in the field of nonproliferation. Since offering its first courses in 2002, IGRSS has assisted a substantial number of UW graduate students in submitting successful applications for nonproliferation positions in U.S. government agencies, including the Nonproliferation Graduate Program at the National Nuclear Security Administration. Since 2001, several UW undergraduates have begun careers in the field of nonproliferation, either by working at national laboratories or enrolling in non-UW graduate programs. The UW brought to its nonproliferation partnership with PNNL long-established programs in a wide range of professional programs and academic disciplines, including the 14 interdisciplinary regional and topical programs of the Jackson School of International Studies. The JSIS is an interdisciplinary and interdepartmental enterprise that brings together faculty and students from across the UW. Since the late 1940s the UW has trained experts for the nation's foreign policy community in programs focused in the languages, cultures, and histories of regions deemed critical to U.S. national security. However, since the termination of its program in nuclear engineering several

  18. Department of Theoretical Physics - Overview

    International Nuclear Information System (INIS)

    Kwiecinski, J.

    2000-01-01

    Full text: Research activity of the Department of Theoretical Physics concerns theoretical high-energy and elementary particle physics, intermediate energy particle physics, theoretical nuclear physics, theory of nuclear matter, theory of quark-gluon plasma and of relativistic heavy-ion collisions, theoretical astrophysics and general physics. There is some emphasis on the phenomenological applications of the theoretical research, yet the more formal problems are also considered. The detailed summary of the research projects and of the results obtained in various fields is given in the abstracts. Our Department actively collaborates with other Departments of the Institute as well as with several scientific institutions both in Poland and abroad. In particular members of our Department participate in the EC network which allows mobility of researchers. Several members of our Department have also participated in the research projects funded by the Polish Committee for Scientific Research (KBN). The complete list of grants is listed separately. Besides pure research, members of our Department are also involved in graduate and undergraduate teaching activity both at our Institute as well as at other academic institutions in Cracow. At present five students are working for their Ph.D. or MSc degrees under supervision of the senior members from the Department. We continue our participation at the EC SOCRATES-ERASMUS educational programme which allows exchange of graduate students between our Department and the Department of Physics of the University of Durham in the UK. (author)

  19. 2001 annual report for the Pend Oreille wetlands wildlife mitigation projects; ANNUAL

    International Nuclear Information System (INIS)

    Entz, Ray D.

    2001-01-01

    The Pend Oreille Wetlands project consists of two adjacent parcels totaling about 600 acres. The parcels make up the northern boundary of the Kalispel Indian Reservation, and is also adjacent to the Pend Oreille River about 25 miles north of Newport and Albeni Falls Dam (Figure 1). Located in the Selkirk Mountains in Pend Oreille County Washington, the project is situated on an active floodplain, increasing its effectiveness as mitigation for Albeni Falls Dam. The combination of the River, wetlands and the north-south alignment of the valley have resulted in an important migratory waterfowl flyway. Washington Department of Fish and Wildlife and Kalispel Natural Resource Department have designated both project sites as priority habitats. Seven habitat types exist on the project properties and include four wetland habitats (open water, emergent, and scrub-shrub and forested), riparian deciduous forest, upland mixed coniferous forest and floodplain meadow. Importance of the project to wildlife is further documented by the occurrence of an active Bald Eagle nest aerie

  20. Promoting Breastfeeding-Friendly Hospital Practices: A Washington State Learning Collaborative Case Study.

    Science.gov (United States)

    Freney, Emily; Johnson, Donna; Knox, Isabella

    2016-05-01

    Hospital breastfeeding support practices can affect breastfeeding outcomes. Learning collaboratives are an increasingly common strategy to improve practices in health care and have been applied to breastfeeding in many cases. The aims of this study of the Evidence-Based Hospital Breastfeeding Support Learning Collaborative (EBBS LC) were to describe the perceptions of participants regarding the process and effectiveness of the EBBS LC, describe perceived barriers and facilitators to implementing the Ten Steps to Successful Breastfeeding, and identify additional actions and resources needed in future learning collaboratives. Qualitative, semistructured telephone interviews were conducted with 13 key staff who represented 16 of the 18 participating hospitals. The learning collaborative was perceived positively by participants, meeting the expectations of 9 and exceeding the expectations of 4 persons interviewed. The most beneficial aspect of the program was its collaborative nature, and the most difficult aspect was the time required to participate as well as technological difficulties. The key barriers were staff time, staff changes, cost, and the difficulty of changing the existing practices of hospitals and communities. The key facilitating factors were supportive management, participation in multiple breastfeeding quality improvement projects, collecting data on breastfeeding outcomes, tangible resources regarding the Ten Steps, and positive community response. Participants in the EBBS LC stated that they would like to see the Washington State Department of Health create a resource-rich, centralized source of information for participants. This learning collaborative approach was valued by participants. Future efforts can be guided by these evaluation findings. © The Author(s) 2015.

  1. BPA riparian fencing and alternative water development projects completed within Asotin Creek Watershed ; 2000 and 2001 Asotin Creek fencing final report of accomplishments

    International Nuclear Information System (INIS)

    Johnson, B.J.Bradley J.

    2002-01-01

    The Asotin County Conservation District (ACCD) is the primary entity coordinating habitat projects on both private and public lands within the Asotin Creek watershed. The watershed covers approximately 325 square miles in the Blue Mountains of southeastern Washington in Water Resource Inventory Area (WRIA) 35. According to Washington Department of Fish and Wildlife's (WDFW) Priority WRIA's by ''At-Risk Stock Significance Map'', it is the highest priority WRIA in southeastern Washington. Summer steelhead, bull trout, and Snake River spring chinook salmon which are listed under the Endangered Species Act (ESA), are present in the watershed. WDFW manages it as a Wild Steelhead Reserve; no hatchery fish have been released here since 1997. The ACCD has been working with landowners, Bonneville Power Administration (BPA), Washington State Conservation Commission (WCC), Natural Resource Conservation Service (NRCS), Washington Department of Fish and Wildlife (WDFW), U.S. Forest Service, Pomeroy Ranger District (USFS), Nez Perce Tribe, Washington Department of Ecology (DOE), National Marine Fisheries Service (NMFS), and U.S. Fish and Wildlife Service (USFWS) to address habitat projects in Asotin County. Local students, volunteers and Salmon Corps members from the Nez Perce Tribe have been instrumental in the success of the Model Watershed Program on Asotin Creek. ACCD began coordinating habitat projects in 1995 with the help of BPA funding. Approximately two hundred and seventy-six projects have been implemented as of 1999. The Washington State Legislature was successful in securing funding for endangered salmon and steelhead recovery throughout the State in 1998. While these issues were new to most of the State, the ACCD has been securing and administering funding for endangered salmonids since 1994. The ''Asotin Creek Riparian Planting 2000-053-00 and Asotin Creek Riparian Fencing 2000-054-00'' teamed BPA and the Governor's Salmon Recovery Funding to plant approximately 84

  2. Summary of Results, Chief Joseph Dam Cultural Resources Project, Washington.

    Science.gov (United States)

    1985-01-01

    under types defined for the Great Basin, and these have virtually Identical temporal ranges (cf. Hester 1973; Heizer and Hester 1978; Holmer 1978...from west Texas. Plains Anthropologist 20:139-149. Heizer , R.F. and T.R. Hester 1978 Great Basin projectile points: forms and chronology. Bal lena Press...The .. modern unstable water levels periodical ly flood the houses and burrows of these aquatic mammals or Isolate them from water, rendering them

  3. Communication tools for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Blazek, Mary Lou; Power, Max S.

    1992-01-01

    From 1944 to 1989, the U.S. Department of Energy produced plutonium at the Hanford Site in southeast Washington State. In the early days of operation, large amounts of radioactive materials were released to the environment. Documents about the releases were made public in 1986. The Hanford Environmental Dose Reconstruction Project began in 1987. The Project will determine how much radioactive material was released, how that material may have exposed people, and what radiation doses people may have received. The Project will be complete in 1995. The federal government pays for the work. The scientific work on the study is done by Battelle's Pacific Northwest Laboratory. Public credibility and valid science are equally important to those directing the dose reconstruction work. A number of tools are used to inform the public and encourage public participation. These tools are examined in this paper. (author)

  4. 75 FR 33587 - Federal Advisory Committee; Department of Defense Wage Committee

    Science.gov (United States)

    2010-06-14

    ... Wage Committee AGENCY: Department of Defense (DoD). ACTION: Notice of closed meeting. SUMMARY: Pursuant... hereby given that the Department of Defense Wage Committee will meet on July 13, 2010, in Rosslyn... writing to the Chairman, Department of Defense Wage Committee, 4000 Defense Pentagon, Washington, DC 20301...

  5. 75 FR 44231 - Federal Advisory Committee; Department of Defense Wage Committee

    Science.gov (United States)

    2010-07-28

    ... Wage Committee AGENCY: Department of Defense (DoD). ACTION: Notice of closed meeting. SUMMARY: Pursuant... hereby given that a closed meeting of the Department of Defense Wage Committee will be held on August 24..., Department of Defense Wage Committee, 4000 Defense Pentagon, Washington, DC 20301- 4000. SUPPLEMENTARY...

  6. 75 FR 28786 - Federal Advisory Committee; Department of Defense Wage Committee

    Science.gov (United States)

    2010-05-24

    ... Wage Committee AGENCY: Department of Defense (DoD). ACTION: Notice of closed meeting. SUMMARY: Pursuant... hereby given that a closed meeting of the Department of Defense Wage Committee will be held on June 15..., Department of Defense Wage Committee, 4000 Defense Pentagon, Washington, DC 20301- 4000. SUPPLEMENTARY...

  7. 75 FR 40796 - Federal Advisory Committee; Department of Defense Wage Committee

    Science.gov (United States)

    2010-07-14

    ... Wage Committee AGENCY: Department of Defense (DoD). ACTION: Notice of closed meeting. SUMMARY: Pursuant... hereby given that a closed meeting of the Department of Defense Wage Committee will be held on August 10..., Department of Defense Wage Committee, 4000 Defense Pentagon, Washington, DC 20301- 4000. SUPPLEMENTARY...

  8. 76 FR 23708 - Safety Zone; Pierce County Department of Emergency Management Regional Water Exercise, East...

    Science.gov (United States)

    2011-04-28

    ...-AA00 Safety Zone; Pierce County Department of Emergency Management Regional Water Exercise, East... the Regional Water Rescue Exercise. Basis and Purpose The Pierce County, Washington, Department of... to read as follows: Sec. 165.T13-0251 Safety Zone; Pierce County Department of Emergency Management...

  9. 28 CFR Appendix I to Part 16 - Components of the Department of Justice

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Components of the Department of Justice I Appendix I to Part 16 Judicial Administration DEPARTMENT OF JUSTICE PRODUCTION OR DISCLOSURE OF MATERIAL OR... Enforcement Administration, U.S. Department of Justice, Washington, DC 20537-0001 Executive Office for...

  10. A team leadership approach to managing the transition from construction to operations for an environmental project

    International Nuclear Information System (INIS)

    Kelly, J.W.

    1994-06-01

    This presentation describes a team approach, at the totalproject level that focused team members with common objectives, for the transition to start-up and operation of the project. The Integrated Management Team (IMT) approach has been successful for this US Department of Energy (DOE) environmental restoration project at the Hanford Site in Richland, Washington. The $53.8-million project will collect, treat, and dispose of low-level mixed waste water discharges from the Hanford Site. Construction is scheduled for completion in September 1994 and facility start-up in June 1995. The project challenge is for leadership that is committed to the transition from construction to operation of the environmental restoration project

  11. Permitting plan for Project W-340, Tank 241-C-106 manipulator retrieval arm

    International Nuclear Information System (INIS)

    Tollefson, K.S.

    1995-01-01

    This document describes the regulatory requirements and describes alternative strategies for obtaining permits and approvals for Project W-340, Tank 241-C-106 Manipulator Retrieval Arm. A comprehensive review of environmental regulations has indicated that several environmental reviews, permits, and approvals are required before design, construction, and operation of the facility. The environmental reviews, permits, and approvals, as well the regulatory authority potentially applicable to the Project W-340 Long Reach Manipulator Arm include the following: National Environmental Policy Act of 1969 -- US Department of Energy, Headquarters; State Environmental Policy Act of 1971 -- State of Washington Department of Ecology; Air Permitting; Dangerous Waste Permitting; Miscellaneous Reviews/Permits/Approvals. This document describes the environmental reviews, permits, and approval requirements for the project. It provides a summary of permit application data requirements, alternative strategies for permit completion and approval, as well as the estimated probability of success for each alternative strategy

  12. PNNL Apatite Investigation at 100-NR-2 Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2009-04-02

    In 2004, the U.S. Department of Energy, Fluor Hanford, Inc., Pacific Northwest National Laboratory (PNNL), and the Washington Department of Ecology agreed that the long-term strategy for groundwater remediation at the 100-N Area would include apatite sequestration as the primary treatment, followed by a secondary treatment if necessary. Since then, the agencies have worked together to agree on which apatite sequestration technology has the greatest chance of reducing strontium-90 flux to the Columbia River. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by staff working on the PNNL Apatite Investigation at 100-NR-2 Project. The plan is designed to be used exclusively by project staff.

  13. Attitudes of Emergency Department Staff towards the Role of Clinical ...

    African Journals Online (AJOL)

    participation of future Pharm-D graduates in direct patient care in the Saudi health care system. Keywords: Clinical ... errors [3]. According to the findings of the. U.S. Institute of Medicine, ED has the highest ..... human: Building a safer health system. Washington, DC: ... department: A systems approach to minimizing risk.

  14. Ergonomics and regulatory politics: the Washington State case.

    Science.gov (United States)

    Silverstein, Michael

    2007-05-01

    Every year in the State of Washington more than 50,000 workers experience a work related musculoskeletal disorder (WMSD), making up more than 30% of all worker compensation cases. In 2000, the Washington State Department of Labor and Industries (L&I) adopted a workplace ergonomics rule requiring employers to reduce worker exposure to hazards that cause or contribute to WMSDs. In 2003, the ergonomics rule was repealed by a margin of 53.5-46.5 in a statewide voter initiative. The official rulemaking record of approximately 100,000 pages, along with supplementary published and unpublished material, was reviewed. The relationship between scientific deliberation and the public policy process in adopting and repealing the ergonomics rule was assessed and described. The deliberative features of the regulatory, judicial, legislative, and ballot processes were compared. The ergonomics rule was successful in the regulatory and legal arenas where the process was most transparent and open to public involvement, differing views could be presented fully, and decision makers were expected to explain their decisions in light of the record. The rule fared most poorly in the legislature and at the ballot box when these features were lost and where considered deliberation was replaced by unconstrained political conflict. Additional checks and balances are needed.

  15. Applied ALARA Workshops Richland, Washington

    International Nuclear Information System (INIS)

    DECKER, W.A.

    1999-01-01

    The purpose of this standard is to provide Project Hanford Management Contractors (PHMC) with guidance for ensuring radiological considerations are adequately addressed throughout the work planning process. Incorporating radiological controls in the planning process is a requirement of the Hanford Site Radiological Control Manual (HSRCM-I), Chapter 3, Part 1. This standard is applicable to all PHMC contractors and subcontractors. The essential elements of this standard will be incorporated into the appropriate site level work control standard upon implementation of the anticipated revision of the PHMC Administration and Procedure System

  16. Public Health Departments

    Data.gov (United States)

    Department of Homeland Security — State and Local Public Health Departments in the United States Governmental public health departments are responsible for creating and maintaining conditions that...

  17. Department of Theoretical Physics - Overview

    International Nuclear Information System (INIS)

    Kwiecinski, J.

    1999-01-01

    Full text: Research activity of the Department of Theoretical Physics concerns theoretical high-energy and elementary particle physics, intermediate energy particle physics, theoretical nuclear physics, theory of nuclear matter, theory of quark-gluon plasma and of relativistic heavy-ion collisions, theoretical astrophysics and general physics. There is some emphasis on the phenomenological applications of the theoretical research yet the more formal problems are also considered. The detailed summary of the research projects and of the results obtained in various fields is given in the abstracts. Our Department actively collaborates with other Departments of the Institute as well as with several scientific institutions both in Poland and abroad. In particular members of our Department participate in the EC network which allows mobility of researchers. Several members of our Department have also participated in the research projects funded by the Polish Committee for Scientific Research (KBN). The complete list of grants is listed separately. Besides pure research, members of our Department are also involved in graduate and undergraduate teaching activity both at our Institute as well as at other academic institutions in Cracow. At present five PhD students are working for their degree under supervision of the senior members from the Department. In the last year we have completed our active participation in the educational TEMPUS programme funded by the European Communities. This programme has in particular allowed exchange of students between our Department and the Department of Physics of the University of Durham in the United Kingdom. In 1998 we joined the SOCRATES - ERASMUS project which will make it possible to continue this exchange. (author)

  18. A green roof grant program for Washington DC

    International Nuclear Information System (INIS)

    Johnson, P.A.

    2007-01-01

    The Chesapeake Bay Foundation (CBF) began its green roof demonstration project with $300,000 in funding provided by the DC Water and Sewer Authority. This paper reviewed the history of the project, its goals and early findings. The main objective was to demonstrate the technical, policy and economic feasibility of installing green roofs on commercial buildings in Washington DC and to promote green roofs as a means to manage storm water and improve water quality through the reduction of excessive runoff. The CBF has issued grants for the installation of 7 green roofs varying in size, design, location, and use. The projects included both new and existing structures designed to improve storm-water management in an urban area with significant pollution stress on the adjacent rivers. This paper provided technical, cost, and performance evaluations of each roof. A public outreach segment provided information to decision-makers to encourage more widespread replication of green roof technology throughout the metropolitan area. Much of the District of Columbia is served by a combined sewer system that becomes overloaded and discharges raw sewage into adjacent rivers during even moderately heavy rains. An average of 75 overflow events each year result in 1.5 billion gallons discharged into the Anacostia River. The installation of green roofs on buildings in the combined sewer area would retain storm water during these heavy rains and reduce the amount of overflow discharges. Apartments, as well as commercial and government buildings with mostly flat roofs are the most likely candidates for green roofs. The demonstration roofs are intended to become models, which all building owners could use as a guide for future plans for construction or re-construction to expand green roof coverage in Washington DC. It was emphasized that although such large-scale replication will take time and financial investments, it is achievable given enough political will and commercial awareness of

  19. Remedial investigation/feasibility study work plan for the 100-FR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-3 operable unit. The 100-K Area consists of the 100-FR-3 groundwater operable unit and two source operable units. The 100-FR-3 operable unit includes all contamination found in the aquifer soils and water beneath the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination. A separate work plan has been initiated for the 100-FR-1 source operable unit (DOE-RL 1992a)

  20. RCRA facility investigation/corrective measures study work plan for the 100-DR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations. Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-DR-1 source operable unit Source operable units include facilities and unplanned release sites that are potential sources of contamination

  1. Remedial investigation/feasibility study work plan for the 100-FR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-08-01

    Four areas of the Hanford Site (the 100, 200,300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-1 operable unit. The 100-FR-1 source operable unit is one of two source operable units in the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination. The groundwater affected or potentially affected by the entire 100-F Area is considered as a separate operable unit, the 100-FR-3 groundwater operable unit. A separate work plan has been initiated for the 100-FR-3 operable unit (DOE/RL 1992a)

  2. RCRA facility investigation/corrective measures study work plan for the 100-HR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US. Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-1 source operable unit. Source operable units include facilities and unplanned release sites that are potential sources of contamination. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Separate work plans have been initiated for the 100-HR-3 groundwater operable unit (DOE-RL 1992a) and the 100-DR-1 (DOE-RL 1992b) source operable units

  3. Natural phenomena hazards, Hanford Site, south central Washington

    International Nuclear Information System (INIS)

    Tallman, A.M.

    1996-01-01

    This document presents the natural phenomena hazard (NPH) loads for use in implementing DOE Order 5480.28, Natural Phenomena Hazards Mitigation, at the Hanford Site in south-central Washington State. The purpose of this document is twofold: (1) summarize the NPH that are important to the design and evaluation of structures, systems, and components at the Hanford Site; (2) develop the appropriate natural phenomena loads for use in the implementation of DOE Order 5480.28. The supporting standards, DOE-STD-1020-94, Natural Phenomena Hazards Design and Evaluation Criteria for Department of Energy Facilities (DOE 1994a); DOE-STD-1022-94, Natural Phenomena Hazards Site Characteristics Criteria (DOE 1994b); and DOE-STD-1023-95, Natural Phenomena Hazards Assessment Criteria (DOE 1995) are the basis for developing the NPH loads

  4. Environmental assessment overview, Reference repository location, Hanford site, Washington

    International Nuclear Information System (INIS)

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified a reference repository location at the Hanford Site in Washington as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. The site is in the Columbia Plateau, which is one of five distinct geohydrologic settings considered for the first repository. To determine their suitability, the Hanford site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. On the basis of the evaluations reported in this EA, the DOE has found that the Hanford site is not disqualified under the guidelines. On the basis of these findings, the DOE is nominating the Hanford site as one of five sites suitable for characterization. 3 figs

  5. Cascade Apartments - Deep Energy Multifamily Retrofit , Kent, Washington (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2014-02-01

    In December of 2009-10, King County Housing Authority (KCHA) implemented energy retrofit improvements in the Cascade multifamily community, located in Kent, Washington (marine climate.)This research effort involved significant coordination from stakeholders KCHA, WA State Department of Commerce, utility Puget Sound Energy, and Cascade tenants. This report focuses on the following three primary BA research questions : 1. What are the modeled energy savings using DOE low income weatherization approved TREAT software? 2. How did the modeled energy savings compare with measured energy savings from aggregate utility billing analysis? 3. What is the Savings to Investment Ratio (SIR) of the retrofit package after considering utility window incentives and KCHA capitol improvement funding.

  6. Washington Schools Learn from Value Engineering.

    Science.gov (United States)

    Doleae, Michael L.; Childs, Harvey C.

    1983-01-01

    Results of two value engineering studies have shown that a review early in the design process can help save costs in school construction, maintenance, operation, and replacement. The value engineering concepts and technical manual are being presented throughout the state of Washington. (MLF)

  7. Natural phenomena hazards, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Conrads, T.J.

    1998-01-01

    This document presents the natural phenomena hazard loads for use in implementing DOE Order 5480.28, Natural Phenomena Hazards Mitigation, and supports development of double-shell tank systems specifications at the Hanford Site in south-central Washington State. The natural phenomena covered are seismic, flood, wind, volcanic ash, lightning, snow, temperature, solar radiation, suspended sediment, and relative humidity

  8. Changing Housing Patterns in Metropolitan Washington

    Science.gov (United States)

    Grier, George; Grier, Eunice

    1975-01-01

    This testimony, before a public hearing of the New York City Commission on Human Rights in May 1974, summarizes extensive studies of changing minority residential patterns in metropolitan Washington and less extensive studies of other groups; the prospects for future desegregation and for using the growing economic potential of minority families…

  9. Washington Irving and the American Indian.

    Science.gov (United States)

    Littlefield, Daniel F., Jr.

    1979-01-01

    Some modern scholars feel that Washington Irving vacillated between romanticism and realism in his literary treatment of the American Indian. However, a study of all his works dealing with Indians, placed in context with his non-Indian works, reveals that his attitude towards Indians was intelligent and enlightened for his time. (CM)

  10. Washington Public Libraries Online: Collaborating in Cyberspace.

    Science.gov (United States)

    Wildin, Nancy

    1997-01-01

    Discussion of public libraries, the Internet, and the World Wide Web focuses on development of a Web site in Washington. Highlights include access to the Internet through online public access catalogs; partnerships between various types of libraries; hardware and software; HTML training; content design; graphics design; marketing; evaluation; and…

  11. Recidivism of Supermax Prisoners in Washington State

    Science.gov (United States)

    Lovell, David; Johnson, L. Clark; Cain, Kevin C.

    2007-01-01

    This study of recidivism among Washington supermax prisoners used a retrospective matched control design, matching supermax prisoners one-to-one with nonsupermax prisoners on mental illness status and up to eight recidivism predictors. Supermax prisoners committed new felonies at a higher rate than nonsupermax controls, but the difference was not…

  12. Timber resource statistics for eastern Washington, 1995.

    Science.gov (United States)

    Neil McKay; Patricia M. Bassett; Colin D. MacLean

    1995-01-01

    This report summarizes a 1990-91 timber resource inventory of Washington east of the crest of the Cascade Range. The inventory was conducted on all private and public lands except National Forests. Timber resource statistics from National Forest inventories also are presented. Detailed tables provide estimates of forest area, timber volume, growth, mortality, and...

  13. Timber resource statistics for western Washington.

    Science.gov (United States)

    Coffin D. MacLean; Patricia M. Bassett; Glenn. Yeary

    1992-01-01

    This report summarizes a 1988-90 timber resource inventory of 19 counties in western Washington: Clallam, Clark, Cowlitz, Grays Harbor, Island, Jefferson, King, Kitsap, Lewis, Mason, Pacific, Pierce, San Juan, Skagit, Skamania, Snohomish, Thurston, Wahkiakum, and Whatcom. Detailed tables of forest area, timber volume, growth, mortality, and harvest are presented.

  14. Washington (Wash) C. Winn: In Memoriam

    Centers for Disease Control (CDC) Podcasts

    2012-03-08

    Dr. Mike Miller and Dr. David Walker dicuss the career and life of noted clinical biologist, Dr. Washington C. Winn Jr.  Created: 3/8/2012 by National Center for Emerging and Zoonotic Infectious Diseases (NCEZID).   Date Released: 3/12/2012.

  15. Department of Theoretical Physics - Overview

    International Nuclear Information System (INIS)

    Kwiecinski, J.

    2002-01-01

    Full text: Research activity of the Department of Theoretical Physics concerns theoretical high energy and elementary particle physics, intermediate energy particle physics, theoretical nuclear physics, theory of nuclear matter, theory of quark-gluon plasma and of relativistic heavy ion collisions, theoretical astrophysics and general physics. There is some emphasis on the phenomenological applications of the theoretical research yet the more formal problems are also considered. The detailed summary of the research projects and of the results obtained in various fields is given in the abstracts. Our Department successfully collaborates with other Departments of the Institute as well as with several scientific institutions both in Poland and abroad. In particular, members of our Department participate in the EC network which allows for the mobility of researchers. Several members of our Department have also participated in the research projects funded by the State Committee for Scientific Research. Besides pure research, members of our Department are also involved in graduate and undergraduate teaching activity both at our Institute and at other academic institutions in Cracow. At present, eight students are working towards their Ph.D. degrees under the supervision of senior members of the Department. (author)

  16. Department of Theoretical Physics - Overview

    International Nuclear Information System (INIS)

    Kwiecinski, J.

    2001-01-01

    Full text: Research activity of the Department of Theoretical Physics concerns theoretical high-energy and elementary particle physics, intermediate energy particle physics, theoretical nuclear physics, theory of nuclear matter, theory of quark-gluon plasma and relativistic heavy-ion collisions, theoretical astrophysics and general physics. There is some emphasis on the phenomenological applications of the theoretical research yet more formal problems are also considered. A detailed summary of the research projects and of the results obtained in various field is given in the abstracts. Our Department actively collaborates with other Departments of the Institute as well as with several scientific institutions both in Poland and abroad. In particular, members of our Department participate in the EC network, which stimulates the mobility of researchers. Several members of our Department also participated in the research projects funded by the Polish Committee for Scientific Research (KBN). Besides pure research, members of our Department are also involved in graduate and up graduate teaching activity at our Institute as well as at other academic institution in Cracow. At present nine students are working on their Ph.D. degrees under the supervision of senior members of the Department. (author)

  17. Drivers' use of marijuana in Washington state : traffic tech.

    Science.gov (United States)

    2016-08-01

    In July 2014, Washington State allowed legal sales of : recreational marijuana. Working with the Washington : Traffic Safety Commission, NHTSA assisted the State in : conducting a roadside study to examine the prevalence : of marijuana use before and...

  18. Trends and determinants of cycling in the Washington, DC region.

    Science.gov (United States)

    2011-01-01

    This report analyzes cycling trends, policies, and commuting in the Washington, DC area. The analysis is divided into two parts. : Part 1 focuses on cycling trends and policies in Washington (DC), Alexandria (VA), Arlington County (VA), Fairfax Count...

  19. Analysis of deep seismic reflection and other data from the southern Washington Cascades. Final report, September 15, 1992--December 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Stanley, W.D.; Johnson, S.Y.; Nuccio, V.F.

    1993-12-01

    This report describes results of a synthesis of geological, geological, geophysical and geochemical data from a largely volcanic rock covered region in southwestern Washington that has been identified as a underlain by thick marine sedimentary rocks. The work was funded by the Deep Source Gas projects at the Morgantown Energy Technology Center (METC). The subproject which resulted in this report is centered in the Branch of Geophysics, US Geological Survey (USGS) has involved one task focused on the application of geophysical methods to the study of phenomena associated with fossil and active subduction zones and non-subduction suture zones that may have deeply emplaced sedimentary rocks. This report represents a summary synthesis of several geophysical and geological data sets. The Southern Washington Cascades Conductor (SWCC) has been examined using several types of data in addition to MT, seismic, magnetic, and gravity Specific geological mapping tasks have been completed trough funding by the Department of Energy and the USGS in the western part of the proposed basin near Morton, WA. Other regional geological studies using wells and outcrops done as part of the USGS Evolution of Sedimentary Basins programs have added information that constraint the possible nature of the SWCC rocks and their tectonic setting. Recently, evaluation of patterns of seismicity in the SWCC region has demonstrated the likelihood of several parallel and step-over strike-slip faults that may have produced the proposed basin or altered its geometry. In addition, the seismicity patterns trace the axis of key anticlinal structures and thrusts.

  20. Tank Waste Remediation System, Hanford Site, Richland, Washington. Final Environmental Impact Statement. Volume VI

    International Nuclear Information System (INIS)

    1996-08-01

    The U.S. Department Of Energy and the Washington State Department of Ecology added Appendix L (Volume 6), Response to Public Comments, to the Tank Waste Remediation System (TWRS) Final Environmental Impact Statement (EIS) for the Hanford Site, Richland, Washington, to fully address and respond to public comments on the Draft EIS. In addition, DOE considered public comments, along with other factors such as programmatic need, short- and long-term impacts, technical feasibility, and cost, in arriving at DOE's preferred alternative. During the public comment period for the Draft EIS, more than 350 individuals, agencies, Tribal Nations, and organizations provided comments. This volume represents a broad spectrum of private citizens; businesses; local, State, and Federal officials; Tribal Nations; and public interest groups

  1. Radiochemistry Education at Washington State University: Sustaining Academic Radiochemistry for the Nation

    International Nuclear Information System (INIS)

    Clark, Sue B.; Nash, Ken; Benny, Paul; Clark, Aurora; Wall, Nathalie; Wall, Don; Yoo, Choong-Shik

    2009-01-01

    Since 2002, Washington State University has been building radiochemistry as a component of its overall chemistry program. Using an aggressive hiring strategy and leveraged funds from the state of Washington and federal agencies, six radiochemistry faculty members have been added to give a total of seven radiochemists out of a department of twenty-five faculty members. These faculty members contribute to a diverse curriculum in radiochemistry, and the Chemistry Department now enjoys a significant increase in the number of trainees, the quantity of research expenditures, and the volume and quality of peer-reviewed scientific literature generated by the radiochemistry faculty and the trainees. These three factors are essential for sustaining the radiochemistry education and research program at any academic institution.

  2. 76 FR 16323 - Irish Potatoes Grown in Washington; Continuance Referendum

    Science.gov (United States)

    2011-03-23

    ...; FV11-946-1 CR] Irish Potatoes Grown in Washington; Continuance Referendum AGENCY: Agricultural... conducted among eligible Washington potato growers to determine whether they favor continuance of the marketing order regulating the handling of Irish potatoes grown in Washington. DATES: The referendum will be...

  3. 76 FR 377 - Land Acquisitions; Cowlitz Indian Tribe of Washington

    Science.gov (United States)

    2011-01-04

    ... State of Washington by Auditor's File Nos. G 450664 and G 147358. Parcel II That portion of the... thereof acquired by the State of Washington by deed recorded under Auditor's File Nos. G 140380 and D... recorded under Auditor's File No. F 38759, records of Clark County, Washington, described as follows...

  4. Assessment of candidate sites for disposal of treated effluents at the Hanford Site, Washington

    International Nuclear Information System (INIS)

    Davis, J.D.

    1992-01-01

    A rigidly defined evaluation process was used to recommend a preferred location to dispose of treated effluents from facilities in the 200 Areas of the US Department of Energy's Hanford Site in Washington State. First, siting constraints were defined based on functional design considerations and siting guidelines. Then, criteria for selecting a preferred site from among several candidates were identified and their relative importance defined. Finally, the weighted criteria were applied and a site was selected for detailed characterization by subsurface investigations

  5. Environmental Assessment Use of Existing Borrow Areas, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    2001-01-01

    The U.S. Department of Energy (DOE) operates the Hanford Site near Richland, Washington. The DOE needs to identify and operate onsite locations for a continued supply of raw aggregate materials [approximately 7,600,000 cubic meters (10,000,000 cubic yards) over the next 10 years] for new facility construction, maintenance of existing facilities and transportation corridors, and fill and capping material for remediation and other sites

  6. Walla Walla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P.; Duke, Bill; Loffink, Ken

    2008-12-30

    In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. Migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage and trapping facility design, operation, and criteria. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. Beginning in March of 2007, two work elements from the Walla Walla Fish Passage Operations Project were transferred to other projects. The work element Enumeration of Adult Migration at Nursery Bridge Dam is now conducted under the Walla Walla Basin Natural Production Monitoring and Evaluation Project and the work element Provide Transportation Assistance is conducted under the Umatilla Satellite Facilities Operation and Maintenance Project. Details of these activities can be found in those project's respective annual reports.

  7. Solutions for Dioctyl Phthalate (DOP) tested high efficiency particulate air (HEPA) filters destined for disposal at Hanford, Washington

    International Nuclear Information System (INIS)

    Gablin, K.A.

    1992-11-01

    In January 1992, Argonne National Laboratory East, Environmental and Waste Management Program, learned that a chemical material used for testing of all HEPA filters at the primary source, Flanders Filter, Inc. in Washington, NC, was considered a hazardous chemical by Washington State Dangerous Waste Regulations. These regulations are under the jurisdiction of the Washington Administration Code, Chapter 173-303, and therefore directly under impact the Hanford Site Solid Waste Acceptance Criteria. Dioctyl Phthalate, ''DOP'' as it is referred to in chemical abbreviation form, is added in small test quantities at the factory, at three Department of Energy (DOE) operated HEPA filter test facilities, and in the installed duct work at various operating laboratories or production facilities. When small amounts of radioactivity are added to the filter media in operation, the result is a mixed waste. This definition would normally only develop in the state of Washington since their acceptance criteria is ten times more stringent then the US Environmental Protection Agencys' (US EPA). Methods of Processing will be discussed, which will include detoxification, physical separation, heat and vacuum separation, and compaction. The economic impact of a mixed waste definition in the State of Washington, and an Low Level Waste (LLW) definition in other locations, may lend this product to be a prime candidate for commercial disposal in the future, or a possible de-listing by the State of Washington

  8. Nuclear Physics Laboratory, University of Washington annual report

    International Nuclear Information System (INIS)

    1998-04-01

    The Nuclear Physics Laboratory at the University of Washington in Seattle pursues a broad program of nuclear physics. These activities are conducted locally and at remote sites. The current programs include in-house research using the local tandem Van de Graaff and superconducting linac accelerators and non-accelerator research in solar neutrino physics at the Sudbury Neutrino Observatory in Canada and at SAGE in Russia, and gravitation as well as user-mode research at large accelerators and reactor facilities around the world. Summaries of the individual research projects are included. Areas of research covered are: fundamental symmetries, weak interactions and nuclear astrophysics; neutrino physics; nucleus-nucleus reactions; ultra-relativistic heavy ions; and atomic and molecular clusters

  9. Watershed Models for Decision Support for Inflows to Potholes Reservoir, Washington

    Science.gov (United States)

    Mastin, Mark C.

    2009-01-01

    A set of watershed models for four basins (Crab Creek, Rocky Ford Creek, Rocky Coulee, and Lind Coulee), draining into Potholes Reservoir in east-central Washington, was developed as part of a decision support system to aid the U.S. Department of the Interior, Bureau of Reclamation, in managing water resources in east-central Washington State. The project is part of the U.S. Geological Survey and Bureau of Reclamation collaborative Watershed and River Systems Management Program. A conceptual model of hydrology is outlined for the study area that highlights the significant processes that are important to accurately simulate discharge under a wide range of conditions. The conceptual model identified the following factors as significant for accurate discharge simulations: (1) influence of frozen ground on peak discharge, (2) evaporation and ground-water flow as major pathways in the system, (3) channel losses, and (4) influence of irrigation practices on reducing or increasing discharge. The Modular Modeling System was used to create a watershed model for the four study basins by combining standard Precipitation Runoff Modeling System modules with modified modules from a previous study and newly modified modules. The model proved unreliable in simulating peak-flow discharge because the index used to track frozen ground conditions was not reliable. Mean monthly and mean annual discharges were more reliable when simulated. Data from seven USGS streamflow-gaging stations were used to compare with simulated discharge for model calibration and evaluation. Mean annual differences between simulated and observed discharge varied from 1.2 to 13.8 percent for all stations used in the comparisons except one station on a regional ground-water discharge stream. Two thirds of the mean monthly percent differences between the simulated mean and the observed mean discharge for these six stations were between -20 and 240 percent, or in absolute terms, between -0.8 and 11 cubic feet per

  10. Subtidal eelgrass/macroalgae surveys for the proposed breakwaters at the US Coast Guard Station at Ediz Hook, Washington, March 1993

    Energy Technology Data Exchange (ETDEWEB)

    Shreffler, D.K. [Battelle/Marine Sciences Lab., Sequim, WA (US)

    1993-05-01

    In 1993, the US Coast Guard proposed to construct two breakwaters and a debris boom to protect its existing pier and moored vessels inside Ediz Hook in Port Angeles Harbor, Washington. To assist the US Army Corps of Engineers -- Seattle District in determining the potential environmental impacts of the proposed breakwaters, Battelle/Marine Sciences Laboratory performed subtidal SCUBA surveys as specified in the Washington Department of Fisheries intermediate eelgrass/macroalgae habitat survey guidelines. The objectives of the subtidal surveys were to (1) quantify the shoot densities of eelgrass; (2) provide percent cover estimates for non-eelgrass macroalgae species; (3) develop a site map indicating the qualitative distribution of eelgrass/macroalgae species, substrate characterization, approximate depth contours, and the approximate location of the proposed project features; and (4) document the time and date of the surveys, turbidity/visibility, presence of invertebrate/vertebrate species, and anecdotal observations pertinent to habitat characterization of the project site. A total of 14 dives along 12 transects (T1--T12) were successfully completed between March 15 and March 17, 1993. Eelgrass was observed on all of the transects except T7 and T8 at the western debris barrier and T12 along the waterward margin of the existing T-pier. The vicinity of the proposed east breakwater had the highest eelgrass shoot densities (up to 89 shoots/m{sup 2}) observed by the divers. Macroalgae and invertebrate species diversity were also highest at the east breakwater site. The low eelgrass densities observed at the west debris barrier site (0 to 14 shoots/m{sup 2}) can be attributed mostly to the lack of suitable substrate. The existing layer of wood debris armoring the bottom at the west project site currently limits, and in the areas of heaviest deposition probably precludes, the growth of eelgrass. As was expected, no eelgrass was observed at the south breakwater site.

  11. Reactor Engineering Department annual report

    International Nuclear Information System (INIS)

    1993-09-01

    This report summarizes the research and development activities in the Department of Reactor Engineering during the fiscal year of 1992 (April 1, 1992-March 31, 1993). The major Department's programs promoted in the year are the assessment of the high conversion light water reactor, the design activities of advanced reactor system and development of a high energy proton linear accelerator for the engineering applications including TRU incineration. Other major tasks of the Department are various basic researches on the nuclear data and group constants, the developments of theoretical methods and codes, the reactor physics experiments and their analyses, fusion neutronics, radiation shielding, reactor instrumentation, reactor control/diagnosis, thermohydraulics and technology developments related to the reactor physics facilities. The cooperative works to JAERI's major projects such as the high temperature gas cooled reactor or the fusion reactor and to PNC's fast reactor project were also progressed. The activities of the Research Committee on Reactor Physics are also summarized. (author)

  12. Reactor engineering department annual report

    International Nuclear Information System (INIS)

    1990-09-01

    This report summarizes the research and development activities in the Department of Reactor Engineering during the fiscal year of 1989 (April 1, 1989 - March 31, 1990). One of major Department's programs is the assessment of the high conversion light water reactor and the design activities of advanced reactor system. Development of a high energy proton linear accelerator for the nuclear engineering including is also TRU incineration promoted. Other major tasks of the Department are various basic researches on nuclear data and group constants, theoretical methods and code development, on reactor physics experiments and analyses, fusion neutronics, radiation shielding, reactor instrumentation, reactor control/diagnosis, thermohydraulics, technology assessment of nuclear energy and technology developments related to the reactor physics facilities. The cooperative works to JAERI's major projects such as the high temperature gas cooled reactor or the fusion reactor and to PNC's fast reactor project also progressed. The activities of the Research Committee on Reactor Physics are also summarized. (author)

  13. Report on Project Action Sheet PP05 task 3 between the U.S. Department of Energy and the Republic of Korea Ministry of Education, Science, and Technology (MEST).

    Energy Technology Data Exchange (ETDEWEB)

    Snell, Mark Kamerer

    2013-01-01

    This report documents the results of Task 3 of Project Action Sheet PP05 between the United States Department of Energy (DOE) and the Republic of Korea (ROK) Ministry of Education, Science, and Technology (MEST) for Support with Review of an ROK Risk Evaluation Process. This task was to have Sandia National Laboratories collaborate with the Korea Institute of Nuclear Nonproliferation and Control (KINAC) on several activities concerning how to determine the Probability of Neutralization, PN, and the Probability of System Effectiveness, PE, to include: providing descriptions on how combat simulations are used to determine PN and PE; comparisons of the strengths and weaknesses of two neutralization models (the Neutralization.xls spreadsheet model versus the Brief Adversary Threat-Loss Estimator (BATLE) software); and demonstrating how computer simulations can be used to determine PN. Note that the computer simulation used for the demonstration was the Scenario Toolkit And Generation Environment (STAGE) simulation, which is a stand-alone synthetic tactical simulation sold by Presagis Canada Incorporated. The demonstration is provided in a separate Audio Video Interleave (.AVI) file.

  14. The states of the art of the nondestructive assay of spent nuclear fuel assemblies. A critical review of the Spent Fuel NDA Project of the U.S. Department of Energy's Next Generation Safeguards Initiative

    International Nuclear Information System (INIS)

    Bolind, Alan Michael; Seya, Michio

    2015-12-01

    The state of the art of the nondestructive assay of spent nuclear fuel assemblies is represented by the results of the Spent Fuel Nondestructive Assay Project of the Next Generation Safeguards Initiative (NGSI) of the U.S. Department of Energy / National Nuclear Security Administration. This report surveys the fourteen advanced nondestructive assay (NDA) techniques that were examined by the NGSI. For each technique, it explains how the technique operates, the NGSI's design of an instrument that uses the technique, how the data are analyzed, and the technique's chief limitations. After this survey of the NDA techniques, the report then discusses and critiques the current paradigm of the practice of NDA of spent fuel assemblies. It shows how the current main problem in the NDA of spent fuel assemblies—namely, an unacceptably large uncertainty in the assay results—is caused primarily by using too few independent NDA measurements. Because the physics of the NDA of spent fuel assemblies is three dimensional, at least three independent NDA measurements are required. Thus, NDA results should be able to be improved dramatically by combining the fourteen advanced NDA techniques plus other existing NDA techniques into appropriate combinations of three techniques. This report evaluates the NGSI's proposed NDA combinations according to these principles. (author)

  15. Shippingport Station Decommissioning Project (SSDP). A progress report

    International Nuclear Information System (INIS)

    Mullee, G.R.; Usher, J.M.

    1986-01-01

    The Shippingport Atomic Power Station was shutdown in October, 1982 by the Plant Operator, Duquesne Light Company, for decommissioning by the US Department of Energy. The planning for decommissioning was completed in September, 1983. In September, 1984 operational responsibility for the station was transferred to the DOE's Decommissioning Operations Contractor - the General Electric Company (assisted by an integrated subcontractor, MK Ferguson Company). Significant accomplishments to date include the completion of all prerequisites for decommissioning, the removal of asbestos from plant systems, loading of irradiated reactor components into the reactor vessel for shipment, the commencement of electrical deactivations and the commencement of piping/component removal. Decontamination and waste processing are progressing in support of the project schedule. The reactor vessel will be shipped as one piece on a barge for burial at Hanford, Washington. The final release of the site is scheduled for April, 1990. A technology transfer program is being utilized to disseminate information about the project

  16. Hanford Waste Vitrification Plant - the project and process systems

    International Nuclear Information System (INIS)

    Swenson, L.D.; Miller, W.C.; Smith, R.A.

    1990-01-01

    The Hanford Waste Vitrification Plant (HWVP) project is scheduled to start construction on the Hanford reservation in southeastern Washington State in 1991. The project will immobilize the liquid high-level defense waste stored there. The HWVP represents the third phase of the U.S. Department of Energy (DOE) activities that are focused on the permanent disposal of high-level radioactive waste, building on the experience of Defense Waste Processing Facility (DWPF) at the Savannah River site, South Carolina, and of the West Valley Demonstration Plant (WVDP), New York. This sequential approach to disposal of the country's commercial and defense high-level radioactive waste allows HWVP to make extensive use of lessons learned from the experience of its predecessors, using mature designs from the earlier facilities to achieve economies in design and construction costs while enhancing operational effectiveness

  17. 75 FR 22836 - Notice of Intent To Prepare a Resource Management Plan for the Eastern Washington and San Juan...

    Science.gov (United States)

    2010-04-30

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLORW00000 L16100000.DO0000; HAG10-0117] Notice of Intent To Prepare a Resource Management Plan for the Eastern Washington and San Juan Planning... Management, Interior. ACTION: Notice of Intent. SUMMARY: In compliance with the National Environmental Policy...

  18. 78 FR 30269 - Foreign-Trade Zone 129-Bellingham, Washington; Authorization of Production Activity; T.C. Trading...

    Science.gov (United States)

    2013-05-22

    ... proposed production activity to the Foreign-Trade Zones (FTZ) Board on behalf of T.C. Trading Company, Inc... DEPARTMENT OF COMMERCE Foreign-Trade Zones Board [B-8-2013] Foreign-Trade Zone 129--Bellingham, Washington; Authorization of Production Activity; T.C. Trading Company, Inc. (Eyeglass Assembly and Kitting...

  19. Low-temperature geothermal resources of Washington

    Energy Technology Data Exchange (ETDEWEB)

    Schuster, J.E. [Washington State Dept. of Natural Resources, Olympia, WA (United States). Div. of Geology and Earth Resources; Bloomquist, R.G. [Washington State Energy Office, Olympia, WA (United States)

    1994-06-01

    This report presents information on the location, physical characteristics, and water chemistry of low-temperature geothermal resources in Washington. The database includes 941 thermal (>20C or 68F) wells, 34 thermal springs, lakes, and fumaroles, and 238 chemical analyses. Most thermal springs occur in the Cascade Range, and many are associated with stratovolcanoes. In contrast, 97 percent of thermal wells are located in the Columbia Basin of southeastern Washington. Some 83.5 percent are located in Adams, Benton, Franklin, Grant, Walla Walla, and Yakima Counties. Yakima County, with 259 thermal wells, has the most. Thermal wells do not seem to owe their origin to local sources of heat, such as cooling magma in the Earth`s upper crust, but to moderate to deep circulation of ground water in extensive aquifers of the Columbia River Basalt Group and interflow sedimentary deposits, under the influence of a moderately elevated (41C/km) average geothermal gradient.

  20. Conversion and correction factors for historical measurements of iodine-131 in Hanford-area vegetation, 1945--1947. Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Mart, E.I.; Denham, D.H.; Thiede, M.E.

    1993-12-01

    This report is a result of the Hanford Environmental Dose Reconstruction (HEDR) Project whose goal is to estimate the radiation dose that individuals could have received from emissions since 1944 at the U.S. Department of Energy`s (DOE) Hanford Site near Richland, Washington. The HEDR Project is conducted by Battelle, Pacific Northwest Laboratories (BNW). One of the radionuclides emitted that would affect the radiation dose was iodine-131. This report describes in detail the reconstructed conversion and correction factors for historical measurements of iodine-131 in Hanford-area vegetation which was collected from the beginning of October 1945 through the end of December 1947.