WorldWideScience

Sample records for project umap units

  1. User modeling, adaptation, and personalization : 17th international conference, UMAP 2009, formerly UM and AH, Trento, Italy, June 22-26, 2009 : proceedings

    NARCIS (Netherlands)

    Houben, G.J.P.M.; McCalla, G.I.; Pianesi, F.; Zancanaro, M.

    2009-01-01

    The First International Conference on User Modeling, Adaptation, and Personalization (UMAP 2009) was held June 22-26, 2009, in Trento, Italy. UMAP 2009 was not, however, the first conference on user modeling or adaptation. In fact, UMAP 2009 merged two vigorous biennial conference traditions - the

  2. Transparency about multidimensional activities and performance: What can U-map and U-multirank contribute?

    NARCIS (Netherlands)

    Westerheijden, Donald F.; Rosa, Maria Joao; Amaral, Alberto

    2014-01-01

    Two new, user-driven and web-based transparency tools for higher education are presented: U-Map, a classification of higher education institutions according to their actual activities, and U-Multirank, a multidimensional ranking of higher education institutions’ and study fields’ performances. The

  3. Solving Differential Equations Analytically. Elementary Differential Equations. Modules and Monographs in Undergraduate Mathematics and Its Applications Project. UMAP Unit 335.

    Science.gov (United States)

    Goldston, J. W.

    This unit introduces analytic solutions of ordinary differential equations. The objective is to enable the student to decide whether a given function solves a given differential equation. Examples of problems from biology and chemistry are covered. Problem sets, quizzes, and a model exam are included, and answers to all items are provided. The…

  4. Project No. 7 - Decommissioning unit at Ignalina NPP. (Engineering and project management)

    International Nuclear Information System (INIS)

    2000-01-01

    In order to manage decommissioning process at Ignalina NPP, a new unit should be established in the framework of the Ignalina NPP organizational structure. The on-site Engineering Project Management Unit (PMU) will adopt an integrated approach to project management , engineering design, planning, procurement, safety and licensing activities at Ignalina NPP site. The PMU will assist the Ignalina NPP management in the development of an integrated decommissioning and waste management strategy

  5. The Levi-Civita Tensor and Identities in Vector Analysis. Vector Field Identities. Modules and Monographs in Undergraduate Mathematics and Its Applications Project. UMAP Unit 427.

    Science.gov (United States)

    Yiu, Chang-li; Wilde, Carroll O.

    Vector analysis is viewed to play a key role in many branches of engineering and the physical sciences. This unit is geared towards deriving identities and establishing "machinery" to make derivations a routine task. It is noted that the module is not an applications unit, but has as its primary objective the goal of providing science,…

  6. Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

    Science.gov (United States)

    Kennedy, Kriss J.; Toup, Larry; Gill, Tracy; Tri, Terry; Howe, Scott; Smitherman, David

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project

  7. Habitat Demonstration Unit Project Leadership and Management Strategies

    Science.gov (United States)

    Kennedy, Kriss J.

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and

  8. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  9. Minneapolis Multi-Ethnic Curriculum Project--Migration Unit.

    Science.gov (United States)

    Minneapolis Public Schools, Minn. Dept. of Intergroup Education.

    The student booklet presents short chapters illustrating the migration unit of the Minneapolis Multi-Ethnic Curriculum Project for secondary schools. Sixteen brief chapters describe migration, immigration, and emigration in the United States. The first six chapters offer first person accounts of immigrants from Norway, Korea, Egypt, Hitler's…

  10. Knowledge capture and preservation at Cernavoda Unit 2 Project

    International Nuclear Information System (INIS)

    Condu, M.; Chirica, T.; Popescu, D.; Marculescu, N.

    2007-01-01

    Full text: As it is known, Cernavoda Unit 2 - Romania, is a delayed nuclear power plant (NPP), started in early '80s, works were frozen in 1990 and resumed in 2003 under a management contract concluded by Nuclearelectrica, the Romanian nuclear utility, with Atomic Energy of Canada Ltd (AECL)-Canada and Ansaldo - Italy. This project has many specificities, including long time stored equipment, some works done 15 to 20 years ago; technology developments during these years; only couple of staff available from those initially involved; and a forthcoming project (Cernavoda Units 3 and 4) in its latest development phase. On top of that, like in other Eastern European countries, Nuclearelectrica is losing people due to salary issue and 'brain drain'. In the actual international situation where the nuclear energy contribution to energy mix is under reconsideration and where the demand for qualified personnel significantly exceeds the offer, it is estimated that maybe the biggest challenge of the forthcoming Cernavoda Units 3 and 4 would be availability of human resources. As Cernavoda Unit 2 Project goes towards a successful completion, all those who put lots of efforts and a difficult to overestimate contribution to overcome all challenges of this special Project will leave one after the other. Special attention is being given by Nuclearelectrica and the main contractors AECL and Ansaldo capturing the knowledge (both explicit and tacit) accumulated in these last almost five years and to leave to those who will continue the forthcoming Unit 3 and 4 Projects and to the nuclear industry in general. The objective on knowledge capture and preservation is to gather all experience and lessons learned during contracting, financing, constructing and commissioning of NPP Cernavoda Unit 2, with a focus on tacit knowledge and to asses potential improvements that might be applied in the forthcoming projects, in order to improve nuclear and economic performance. There are couple of

  11. Cernavoda - Unit 2. A strategic project for Romania

    International Nuclear Information System (INIS)

    Saroudis, J.I.; Chirica, T.; Villabruna, G.

    1999-01-01

    The paper presents some key aspects of the Romanian nuclear program, focusing on Cernavoda NPP Unit No. 2 and the partnership with Atomic Energy of Canada Ltd. (AECL) and ANSALDO Italy for completion of this project. A brief historical presentation of the Romanian nuclear program is included. The success of Cernavoda NPP Unit 1 represents an important element in finalizing Unit 2 in an advanced state of equipment installation and more than 40 % complete. Also, the national infrastructure, including the legal framework and new Electricity Law represents a positive element for Project completion. The Romanian Nuclear Regulatory Body represents the guarantee for the safe operation of CANDU reactors in Romania.(author)

  12. Decommissioning project management unit started its activities

    International Nuclear Information System (INIS)

    Medeliene, D.

    2002-01-01

    The Decommissioning Project Management Unit team comprises western experts as well as experts from INPP Decommissioning Service who all work as a single team. The DPMU will develop the Final Decommissioning Plan and a more detailed Decommissioning Project, which will describe how the plant will be removed from service and safely decommissioned

  13. Error Correcting Codes I. Applications of Elementary Algebra to Information Theory. Modules and Monographs in Undergraduate Mathematics and Its Applications Project. UMAP Unit 346.

    Science.gov (United States)

    Rice, Bart F.; Wilde, Carroll O.

    It is noted that with the prominence of computers in today's technological society, digital communication systems have become widely used in a variety of applications. Some of the problems that arise in digital communications systems are described. This unit presents the problem of correcting errors in such systems. Error correcting codes are…

  14. Project for construction of a new nuclear unit in Armenia

    International Nuclear Information System (INIS)

    2010-01-01

    WorleyParsons Project Description Scope of work: Management Services for Implementation of the Project on Construction of New Nuclear Unit(s) in the Republic of Armenia. Client: Ministry of Energy and Natural Resources (MENR), Republic of Armenia •Contract signed on 29 of May 2009 •Project divided into 4 Phases. Addendum 1 covers phase I and II signed on 27 of July. Contract entered into force 7 of August

  15. Actual status of project Mochovce NPP units 3 and 4 completion

    International Nuclear Information System (INIS)

    Niznan, S.

    2005-01-01

    In this presentation author deals with actual status of project Mochovce NPP units 3 and 4 completion. Present state of Mochovce NPP, Units 3 and 4 enables real assumption to completion. It is expected that such supplier companies can be used which are experienced in field of nuclear projects. Based on budget of 2002, it seems that completion costs of 45 billions SKK are real. These figures were confirmed by study performed by TRACTEBEL in 2004. Based on experience from Bohunice NPP completion as well as from Mochovce NPP, Units 1 and 2 completion and if decision milestone and project start up deadlines will be observed according to modified preliminary schedule of Mochovce NPP Units 3 and 4 completion, it seems as real that Unit 3 will be completed till 06/2011 and Unit 4 - till 12/2011.

  16. The Kozloduy project management unit

    International Nuclear Information System (INIS)

    Carnes, W.S.; Gros-Gean, P.; Demireva, E.

    2004-01-01

    The Project Management Unit (PMU) has been established in support to the Kozloduy NPP decommissioning department. It is comprised of a Consortium of the British Nuclear Group, EDF and subcontractor ENPRO Consult. It is responsible for the management of seven projects (a facility for dry storage of spent fuel; equipment to treat low activity liquid radioactive waste; provision of physical separation of the plant systems and areas to be decommissioned from the ones in operation; equipment to decontaminate and clean pools and large tanks; a facility to provide high volume reduction of solid radioactive wastes and retrieval and conditioning of ion exchange resins and other sorbents; equipment to provide measurement for the free-release of materials and components; a facility for personnel monitoring, decontamination and clothes changing for work outside of the normal radiological control areas) that will be used in support of the KNPP decommissioning process. The projects will be tendered in compliance with the European Bank for Reconstruction and Development requirements

  17. Project Management Unit for decommissioning of NPP Bohunice VI (2003-2014)

    International Nuclear Information System (INIS)

    Gonzalez Fernandez-conde, A.; Brochet, I.; Ferreira, A.

    2015-01-01

    From October 2003 until december 2014 the Consortium consisting of Iberdrola Engineering and Construction (leader). Empresarios Agrupados Internacional, and Indra Sistemas has carried out the project Project Management Unit ((PMU) for the decommissioning of Bohunice V1 NPP (units 1 and 2), type VVER-440/V-230 in Slovakia. during the first phase (2003-2007) EdF was also part of the Consortium. The project is funded by the Bohunice International Decommissioning Support Fund (BIDSF) administered by the RBRD. The main objective of the project is to provide the necessary engineering and resources of project management for planning, execution, management, coordination and monitoring of all tasks in support of the decommissioning. (Author)

  18. Radiation control in the core shroud replacement project of Fukushima-Daiichi NPS Unit no.2

    International Nuclear Information System (INIS)

    Kokubun, Yasunori; Haraguchi, Kazuyuki; Yoshizawa, Yuji; Yamada, Yasuo

    2000-01-01

    In Fukushima-Daiichi NPS Unit no.2, the core shroud replacement was made following that of Unit no.3. This project involves replacement of wide-ranging equipment, with the project extending over a long period of time. This was expected to increase the dose equivalent of workers. Accordingly, various measures to lower the dose equivalent were planned and implemented. We outline radiation controls implemented during the project period. The shroud replacement project was a preventive maintenance project which consisted of replacing the core shroud and other internals with those less susceptible to stress corrosion cracking. Problems related to radiation control during the replacement project of Unit no.3 the year before last were summarized. We studied, planned, and implemented measures to be reflected in the project for Unit no.2. This was done to lower the dose equivalent as much as possible while paying due attention to safety and economy. For radiation control during the project for Unit no.2, experiments with Unit no.3 were fully exploited and any effective measures taken at that time were adopted in this project. Problems pointed out after that project with Unit no.3 resulted in new or improved measures being taken with Unit no.2. Measures taken over from the project with Unit no.3; a. Daily analysis of difference between expected and actual dose equivalents b. Dose reduction measures, chemical decontamination, temporary shield, flushing, etc.; New or improved measures; a. Dose reduction measures: Mechanical removal of radiation sources, strengthening of shield, etc.; b. Automatic remote control system; c. Use of new protective devices. With measures implemented as described above, the dose equivalent during shroud replacement of Unit no.2 was reduced by about 30% when compared with that (11.5 persons · Sv) in the case of Unit no.3. Implemented radiation controls will be checked and reviewed in future for reflection in projects with other units. (author)

  19. Hydrocarbons. Independent Learning Project for Advanced Chemistry (ILPAC). Unit O1.

    Science.gov (United States)

    Inner London Education Authority (England).

    This unit on hydrocarbons is one of 10 first year units produced by the Independent Learning Project for Advanced Chemistry (ILPAC). The unit is divided into sections dealing with alkanes, alkenes, alkynes, arenes, and several aspects of the petroleum industry. Two experiments, exercises (with answers), and pre- and post-tests are included.…

  20. Bruce A units 1 and 2 restart project

    International Nuclear Information System (INIS)

    Routledge, K.

    2006-01-01

    This presentation provides an overview of the Bruce A Units 1 and 2 Restart project from the vantage point of the Project Management Contractor (PMC). The presentation will highlight the unique structure of the project, which has been designed to maximize project efficiencies while minimizing the impact to the Bruce Power operational reactors. Efficiency improvements covered in the presentation includes: support services provided to the direct work contractors, radiation protection, worker protection, engineering, field execution, maintenance and facilities. The presentation focusses on the roles of the PMC in helping to ensure the successful outcome of this ambitious reactor refurbishment project. In addition, the Construction Island concept that has been implemented on the project will be presented, with some of the innovative thinking that has gone into its creation. The organization of the PMC and an overview of the project schedule is also presented. AMEC NCL is a privately held consultancy in the Canadian nuclear industry which provides experienced and flexible multi-disciplined resources to support full project management, engineering solutions and safety consultancy services throughout the life cycle of nuclear facilities in Canada, and for customers in related markets in North America and overseas. AMEC NCL is a wholly-owned subsidiary of AMEC plc

  1. 78 FR 69363 - Lake Tahoe Basin Management Unit, California, Heavenly Mountain Resort Epic Discovery Project

    Science.gov (United States)

    2013-11-19

    ... DEPARTMENT OF AGRICULTURE Forest Service Lake Tahoe Basin Management Unit, California, Heavenly Mountain Resort Epic Discovery Project AGENCY: Lake Tahoe Basin Management Unit, Forest Service, USDA...: The Epic Discovery Project is intended to enhance summer activities in response to the USDA Forest...

  2. The Senegal Project: A Cultural Foods Unit for Middle School Students

    Science.gov (United States)

    Nelson, Diane

    2011-01-01

    The Senegal Project is the culminating project in a unit on cultural foods in an 8th grade family and consumer sciences (FCS) course. Initially, students take a quick world tour by studying and cooking foods from Mexico, Italy, China, and India followed by a "more depth and less breadth" study of Senegal, a country with a culture vastly…

  3. Surviving the Lead Reliability Engineer Role in High Unit Value Projects

    Science.gov (United States)

    Perez, Reinaldo J.

    2011-01-01

    A project with a very high unit value within a company is defined as a project where a) the project constitutes one of a kind (or two-of-a-kind) national asset type of project, b) very large cost, and c) a mission failure would be a very public event that will hurt the company's image. The Lead Reliability engineer in a high visibility project is by default involved in all phases of the project, from conceptual design to manufacture and testing. This paper explores a series of lessons learned, over a period of ten years of practical industrial experience by a Lead Reliability Engineer. We expand on the concepts outlined by these lessons learned via examples. The lessons learned are applicable to all industries.

  4. Projecting climate change in the United States: A technical document supporting the Forest Service RPA 2010 Assessment

    Science.gov (United States)

    Linda A. Joyce; David T. Price; David P. Coulson; Daniel W. McKenney; R. Martin Siltanen; Pia Papadopol; Kevin. Lawrence

    2014-01-01

    A set of climate change projections for the United States was developed for use in the 2010 USDA Forest Service RPA Assessment. These climate projections, along with projections for population dynamics, economic growth, and land use change in the United States, comprise the RPA scenarios and are used in the RPA Assessment to project future renewable resource conditions...

  5. PERHITUNGAN DANA PENSIUN DENGAN METODE PROJECTED UNIT CREDIT DAN INDIVIDUAL LEVEL PREMIUM

    Directory of Open Access Journals (Sweden)

    I GUSTI AYU KOMANG KUSUMA WARDHANI

    2014-08-01

    Full Text Available The company which provides the pension program needs the actuarial valuation to estimate the fund amount required by the company to pay for pension funding. Actuarial method that used in this research are projected unit credit and invidual level premium method. Through this research be obtained the result of valuation pension benefits with career average salary assumption is lower than the other salary assumptions. On the other hand, the result of normal cost final value valuation using individual level premium method is smaller than projected unit credit method that suits for the participants of the pension funding program.

  6. PERHITUNGAN DANA PENSIUN DENGAN METODE PROJECTED UNIT CREDIT DAN INDIVIDUAL LEVEL PREMIUM

    Directory of Open Access Journals (Sweden)

    I GUSTI AYU KOMANG KUSUMA WARDHANI

    2014-05-01

    Full Text Available The company which provides the pension program needs the actuarial valuation to estimate the fund amount required by the company to pay for pension funding. Actuarial method that used in this research are projected unit credit and invidual level premium method. Through this research be obtained the result of valuation pension benefits with career average salary assumption is lower than the other salary assumptions. On the other hand, the result of normal cost final value valuation using individual level premium method is smaller than projected unit credit method that suits for the participants of the pension funding program.

  7. Financing Nuclear Projects. Case Study: Unit 2 Cernavoda NPP

    International Nuclear Information System (INIS)

    Chirica, Teodor; Constantin, Carmencita; Dobrin, Marian

    2003-01-01

    The implementation of a Nuclear Power Plant (NPP) is a major undertaking for all entities involved, due to the necessity of planning work and coordination of the implementation process of the different fields of interest, starting with the governmental authorities and ending with the public. Having in view the specific investment costs (relatively high) for a NPP, finding an adequate financing structure is possible through an iterative process that involves first an assessment of the technical performances of the project and secondly, the mathematical modelling of the financing structure effects on the projects. In this respect, the paper will be focused on the main steps needed in order to promote an investment project in nuclear field, starting with the decision phase, providing the documentation requested by the local and international authorities to promote the project and ending with the negotiation of the contracts (commercial contract, financing contract, purchase contract, etc). The case study will be focused on the phases achieved in order to promote the Unit 2 NPP Cernavoda completion works project. (authors)

  8. Financing nuclear projects. Case study: Unit 2 Cernavoda NPP

    International Nuclear Information System (INIS)

    Chirica, T.; Pall, S.; Lebedev, A.; Dobrin, M.

    2003-01-01

    The implementation of a Nuclear Power Plant (NPP) in a country is a major undertaking for all entities involved, due to the necessity of planning work and co-ordination of the implementation process of the different fields of interest, starting with the governmental authorities and ending with the people. Having in view the specific investment cost (relatively high) for a NPP, to find an adequate financing structure is possible through an iterative process that involves first an assessment of the technical performances of the project and second, the mathematical modelling of the financing structure effects on the project. In this respect, the paper proposed will be focused on the main steps needed in order to promote an investment project in nuclear field, starting with the decision phase, providing the documentations requested by the local and international authorities to promote the project and ending with the negotiation of the contracts (commercial contract, financing contract, power purchase contract, etc.) The case study will be focused on the phases achieved in order to promote the Unit 2 Cernavoda NPP completion works project. (author)

  9. 78 FR 1246 - Otay River Estuary Restoration Project; South San Diego Bay Unit and Sweetwater Marsh Unit of the...

    Science.gov (United States)

    2013-01-08

    ...-FF08RSDC00] Otay River Estuary Restoration Project; South San Diego Bay Unit and Sweetwater Marsh Unit of the... scoping with regard to the environmental impact statement (EIS) for the proposed Otay River Estuary... one of the following methods. Email: [email protected] . Please include ``Otay Estuary NOI'' in the...

  10. Coordinated Research Projects of the IAEA Atomic and Molecular Data Unit

    Science.gov (United States)

    Braams, B. J.; Chung, H.-K.

    2011-05-01

    The IAEA Atomic and Molecular Data Unit is dedicated to the provision of databases for atomic, molecular and plasma-material interaction (AM/PMI) data that are relevant for nuclear fusion research. IAEA Coordinated Research Projects (CRPs) are the principal mechanism by which the Unit encourages data evaluation and the production of new data. Ongoing and planned CRPs on AM/PMI data are briefly described here.

  11. Coordinated Research Projects of the IAEA Atomic and Molecular Data Unit

    International Nuclear Information System (INIS)

    Braams, B. J.; Chung, H.-K.

    2011-01-01

    The IAEA Atomic and Molecular Data Unit is dedicated to the provision of databases for atomic, molecular and plasma-material interaction (AM/PMI) data that are relevant for nuclear fusion research. IAEA Coordinated Research Projects (CRPs) are the principal mechanism by which the Unit encourages data evaluation and the production of new data. Ongoing and planned CRPs on AM/PMI data are briefly described here.

  12. Population Estimates and Projections: Projections of the Population of the United States, 1975 to 2050. Current Population Reports, Series P-25, No. 601.

    Science.gov (United States)

    Gibson, Campbell; Wetrogan, Signe

    This report presents population projections of the United States by age, sex, and the components of population changes, births, deaths, and net immigration. These projections are shown annually by race--white and black--from 1975 to 2000 and in less detail for the total population from 2000 to 2050. In 1974, the population of the United States,…

  13. The Gaseous State. Independent Learning Project for Advanced Chemistry (ILPAC). Unit P1.

    Science.gov (United States)

    Inner London Education Authority (England).

    This unit on the gaseous state is one of 10 first year units produced by the Independent Learning Project for Advanced Chemistry (ILPAC). The unit consists of two levels. Level one deals with the distinctive characteristics of gases, then considers the gas laws, in particular the ideal gas equation and its applications. Level two concentrates on…

  14. Equilibrium I: Principles. Independent Learning Project for Advanced Chemistry (ILPAC). Unit P2.

    Science.gov (United States)

    Inner London Education Authority (England).

    This unit on the principles of equilibrium is one of 10 first year units produced by the Independent Learning Project for Advanced Chemistry (ILPAC). The unit consists of two levels. After a treatment of non-mathematical aspects in level one (the idea of a reversible reaction, characteristics of an equilibrium state, the Le Chatelier's principle),…

  15. Controlling engineering project changes for multi-unit, multi-site standardized nuclear power plants

    International Nuclear Information System (INIS)

    Randall, E.; Boddeker, G.; McGugin, H.; Strother, E.; Waggoner, G.

    1978-01-01

    Multibillioin dollar multiple nuclear power plant projects have numerous potential sources of engineering changes. The majority of these are internally generated changes, client generated changes, and changes from construction, procurement, other engineering organizations, and regulatory organizations. For multiunit, multisite projects, the use of a standardized design is cost effective. Engineering changes can then be controlled for a single standardized design, and the unit or site unique changes can be treated as deviations. Once an effective change procedure is established for change control of the standardized design, the same procedures can be used for control of unit or site unique changes

  16. Justification of the project a network of freight terminals unitized cargo

    Directory of Open Access Journals (Sweden)

    Ilesaliev D.I.

    2016-12-01

    Full Text Available In this paper we consider the question of Uzbekistan in promoting the development of international transport in supply chains. The development of transport infrastructure to ensure timely delivery of goods is one of the main tasks in supply chain management. The aim is to study of the project network terminal unitized cargo Uzbekistan in supply chains. Methods the study is based on analysis of existing methods and techniques of Russian scientists in the field of place-ment of objects. The method of searching the most rational location of logistics facility in the supply chain. Also pre-justified the project network terminal unitized cargo in Uzbekistan. Given the state of the problems and prospects of transport logistics of Uzbekistan, the developed method can be used by experts when performing the supporting calcula-tions location of logistic objects.

  17. North Anna Power Station - Unit 1: Overview of steam generator replacement project activities

    International Nuclear Information System (INIS)

    Gettler, M.W.; Bayer, R.K.; Lippard, D.W.

    1993-01-01

    The original steam generators at Virginia Electric and Power Company's (Virginia Power) North Anna Power Station (NAPS) Unit 1 have experienced corrosion-related degradation that require periodic inspection and plugging of steam generator tubes to ensure their continued safe and reliable operation. Despite improvements in secondary water chemistry, continued tube degradation in the steam generators necessitated the removal from service of approximately 20.3 percent of the tubes by plugging, (18.6, 17.3, and 25.1 for steam generators A, B, and C, respectively). Additionally, the unit power was limited to 95 % during, its last cycle of operation. Projections of industry and Virginia Power experience indicated the possibility of mid-cycle inspections and reductions in unit power. Therefore, economic considerations led to the decision to repair the steam generators (i.e., replace the steam generator lower assemblies). Three new Model 51F Steam Generator lower assembly units were ordered from Westinghouse. Virginia Power contracted Bechtel Power Corporation to provide the engineering and construction support to repair the Unit 1 steam generators. On January 4, 1993, after an extended coastdown period, North Anna Unit 1 was brought off-line and the 110 day (breaker-to-breaker) Steam Generator Replacement Project (SGRP) outage began. As of this paper, the outage is still in progress

  18. Divergent projections of future land use in the United States arising from different models and scenarios

    Science.gov (United States)

    Sohl, Terry L.; Wimberly, Michael; Radeloff, Volker C.; Theobald, David M.; Sleeter, Benjamin M.

    2016-01-01

    A variety of land-use and land-cover (LULC) models operating at scales from local to global have been developed in recent years, including a number of models that provide spatially explicit, multi-class LULC projections for the conterminous United States. This diversity of modeling approaches raises the question: how consistent are their projections of future land use? We compared projections from six LULC modeling applications for the United States and assessed quantitative, spatial, and conceptual inconsistencies. Each set of projections provided multiple scenarios covering a period from roughly 2000 to 2050. Given the unique spatial, thematic, and temporal characteristics of each set of projections, individual projections were aggregated to a common set of basic, generalized LULC classes (i.e., cropland, pasture, forest, range, and urban) and summarized at the county level across the conterminous United States. We found very little agreement in projected future LULC trends and patterns among the different models. Variability among scenarios for a given model was generally lower than variability among different models, in terms of both trends in the amounts of basic LULC classes and their projected spatial patterns. Even when different models assessed the same purported scenario, model projections varied substantially. Projections of agricultural trends were often far above the maximum historical amounts, raising concerns about the realism of the projections. Comparisons among models were hindered by major discrepancies in categorical definitions, and suggest a need for standardization of historical LULC data sources. To capture a broader range of uncertainties, ensemble modeling approaches are also recommended. However, the vast inconsistencies among LULC models raise questions about the theoretical and conceptual underpinnings of current modeling approaches. Given the substantial effects that land-use change can have on ecological and societal processes, there

  19. PV Project Finance in the United States, 2016

    Energy Technology Data Exchange (ETDEWEB)

    Feldman, David; Lowder, Travis; Schwabe, Paul

    2016-09-01

    This brief is a compilation of data points and market insights that reflect the state of the project finance market for solar photovoltaic (PV) assets in the United States as of the third quarter of 2016. This information can generally be used as a simplified benchmark of the costs associated with securing financing for solar PV as well as the cost of the financing itself (i.e., the cost of capital). Three sources of capital are considered -- tax equity, sponsor equity, and debt -- across three segments of the PV marketplace.

  20. Brief introduction to project management of full scope simulator for Qinshan 300 MW Nuclear Power Unit

    International Nuclear Information System (INIS)

    Chen Jie

    1996-01-01

    The key points in development and engineering project management of full scope simulator for Qinshan 300 MW Nuclear Power Unit are briefly introduced. The Gantt chart, some project management methods and experience are presented. The key points analysis along with the project procedure will be useful to the similar project

  1. Equilibrium II: Acids and Bases. Independent Learning Project for Advanced Chemistry (ILPAC). Unit P3.

    Science.gov (United States)

    Inner London Education Authority (England).

    This unit on equilibrium is one of 10 first year units produced by the Independent Learning Project for Advanced Chemistry (ILPAC). The unit, which consists of two levels, focuses on the application of equilibrium principles to equilibria involving weak acids and bases, including buffer solutions and indicators. Level one uses Le Chatelier's…

  2. Projections in donor organs available for liver transplantation in the United States: 2014-2025.

    Science.gov (United States)

    Parikh, Neehar D; Hutton, David; Marrero, Wesley; Sanghani, Kunal; Xu, Yongcai; Lavieri, Mariel

    2015-06-01

    With the aging US population, demographic shifts, and obesity epidemic, there is potential for further exacerbation of the current liver donor shortage. We aimed to project the availability of liver grafts in the United States. We performed a secondary analysis of the Organ Procurement and Transplantation Network database of all adult donors from 2000 to 2012 and calculated the total number of donors available and transplanted donor livers stratified by age, race, and body mass index (BMI) group per year. We used National Health and Nutrition Examination Survey and Centers for Disease Control and Prevention historical data to stratify the general population by age, sex, race, and BMI. We then used US population age and race projections provided by the US Census Bureau and the Weldon Cooper Center for Public Service and made national and regional projections of available donors and donor liver utilization from 2014 to 2025. We performed sensitivity analyses and varied the rate of the rise in obesity, proportion of Hispanics, population growth, liver utilization rate, and donation after cardiac death (DCD) utilization. The projected adult population growth in the United States from 2014 to 2025 will be 7.1%. However, we project that there will be a 6.1% increase in the number of used liver grafts. There is marked regional heterogeneity in liver donor growth. Projections were significantly affected by changes in BMI, DCD utilization, and liver utilization rates but not by changes in the Hispanic proportion of the US population or changes in the overall population growth. Overall population growth will outpace the growth of available donor organs and thus potentially exacerbate the existing liver graft shortage. The projected growth in organs is highly heterogeneous across different United Network for Organ Sharing regions. Focused strategies to increase the liver donor pool are warranted. © 2015 American Association for the Study of Liver Diseases.

  3. Projecting housing starts and softwood lumber consumption in the United States

    Science.gov (United States)

    Jeffrey P. Prestemon; David N. Wear; Karen L. Abt; Robert C. Abt

    2018-01-01

    New residential construction is a primary user of wood products in the United States; therefore, wood products projections require understanding the determinants of housing starts. We model quarterly US total, single-family, and multifamily housing starts with several model specifications, using data from 1979 to 2008, and evaluate their...

  4. United States-Mexico Border Diabetes Prevalence Survey: lessons learned from implementation of the project.

    Science.gov (United States)

    de Cosío, Federico G; Díaz-Apodaca, Beatriz A; Ruiz-Holguín, Rosalba; Lara, Agustín; Castillo-Salgado, Carlos

    2010-09-01

    This paper reviews and discusses the main procedures and policies that need to be followed when designing and implementing a binational survey such as the United States of America (U.S.)-Mexico Border Diabetes Prevalence Study that took place between 2001 and 2002. The main objective of the survey was to determine the prevalence of diabetes in the population 18 years of age or older along U.S.-Mexico border counties and municipalities. Several political, administrative, financial, legal, and cultural issues were identified as critical factors that need to be considered when developing and implementing similar binational projects. The lack of understanding of public health practices, implementation of existing policies, legislation, and management procedures in Mexico and the United States may delay or cancel binational research, affecting the working relation of both countries. Many challenges were identified: multiagency/multifunding, ethical/budget clearances, project management, administrative procedures, laboratory procedures, cultural issues, and project communications. Binational projects are complex; they require coordination between agencies and institutions at federal, state, and local levels and between countries and need a political, administrative, bureaucratic, cultural, and language balance. Binational agencies and staff should coordinate these projects for successful implementation.

  5. Inpatient Dialysis Unit Project Development: Redesigning Acute Hemodialysis Care.

    Science.gov (United States)

    Day, Jennifer

    2017-01-01

    Executive leaders of an acute care hospital performed a market and financial analysis, and created a business plan to establish an inpatient hemodialysis unit operated by the hospital to provide safe, high-quality, evidence-based care to the population of individuals experiencing end stage renal disease (ESRD) within the community. The business plan included a SWOT (Strengths - Weaknesses - Opportunities - Threats) analysis to assess advantages of the hospital providing inpatient hemodialysis services versus outsourcing the services with a contracted agency. The results of the project were a newly constructed tandem hemodialysis room and an operational plan with clearly defined key performance indicators, process improvement initiatives, and financial goals. This article provides an overview of essential components of a business plan to guide the establishment of an inpatient hemodialysis unit. Copyright© by the American Nephrology Nurses Association.

  6. Best practices of internationalization of the Higher Education in Asia-Pacific: The case of management of a double degree program

    Directory of Open Access Journals (Sweden)

    Félix Rogelio Flores

    2012-09-01

    Full Text Available The challenges of nations from Asia and the Pacific to create sustainable and economic spaces, have led their people to seek new educative mechanisms to forge from their childhood and youth, more competitive people, generators of wealth; as an example, China, Korea and India, being the internationalization the best example. This article presents a brief overview of the major events that have given way to new patterns of mobility and internationalization of Umap since its inception in 1993 until today. We present the case of the school of marketing in which outlines the learning, as a result of the institutional efforts of a double degree program with a University of the Umap program, this will allow to identify areas of prospect to establish improvements in an internationalization program of any Institution of higher education that aspire to any position in the global context.

  7. A comparative analysis of business structures suitable for farmer-owned wind power projects in the United States

    International Nuclear Information System (INIS)

    Bolinger, Mark; Wiser, Ryan

    2006-01-01

    For years, farmers in the United States have looked with envy on their European counterparts' ability to profitably farm the wind through ownership of distributed, utility-scale wind projects. Only within the past few years, however, has farmer- or community-owned wind power development become a reality in the United States. The primary hurdle to this type of development in the United States has been devising and implementing suitable business and legal structures that enable such projects to take advantage of tax-based federal incentives for wind power. This article discusses the limitations of such incentives in supporting farmer- or community-owned wind projects, describes four ownership structures that potentially overcome such limitations, and finally conducts comparative financial analysis on those four structures, using as an example a hypothetical 1.5 MW farmer-owned project located in the state of Oregon. We find that material differences in the competitiveness of each structure do exist, but that choosing the best structure for a given project will largely depend on the conditions at hand; e.g., the ability of the farmer(s) to utilize tax credits, preference for individual versus 'cooperative' ownership, and the state and utility service territory in which the project will be located

  8. Projected demographic composition of the United States population of people living with diagnosed HIV.

    Science.gov (United States)

    Hood, Julia E; Golden, Matthew R; Hughes, James P; Goodreau, Steven M; Siddiqi, Azfar-E-Alam; Buskin, Susan E; Hawes, Stephen E

    2017-12-01

    The transformation of HIV from a fatal disease to lifelong disease has resulted in an HIV-infected population that is growing and aging, placing new and increasing demands on public programs and health services. We used National HIV Surveillance System and US census data to project the demographic composition of the population of people living with diagnosed HIV (PLWDH) in the United States through 2045. The input parameters for the projections include: (1) census projections, (2) number of people with an existing HIV diagnosis in 2013, (3) number of new HIV diagnoses in 2013, and (4) death rate within the PLWDH population in 2013. Sex-, risk group-, and race-specific projections were estimated through an adapted Leslie Matrix Model for age-structured populations. Projections for 2013-2045 suggest that the number of PLWDH in the U.S. will consistently grow, from 917,294 to 1,232,054, though the annual growth rate will slow from 1.8% to 0.8%. The number of PLWDH aged 55 years and older will increase from 232,113 to 470,221. The number of non-Hispanic (NH) African Americans/Blacks and Hispanics is projected to consistently grow, shifting the racial/ethnic composition of the US PLWDH population from 32 to 23% NH-White, 42 to 38% NH-Black, and 20-32% Hispanic between 2013 and 2045. Given current trends, the composition of the PLWDH population is projected to change considerably. Public health practitioners should anticipate large shifts in the age and racial/ethnic structure of the PLWDH population in the United States.

  9. DOE Project 353: TAMS Prototype and production coupling alignment units

    Energy Technology Data Exchange (ETDEWEB)

    Field, K.V.

    1996-02-01

    TAMS is an electronic measurement system used to determine the alignment of turbine-generator shafts at the coupling interface. The displacement transducer is a strain gage based sensor mounted in a portable probe. The measurement system was experiencing zero input drift and temperature induced drift. This project endeavored to determine the source of these problems and to revise a unit to be returned to a customer, Baltimore Gas and Electric (BGE), within a period of five weeks.

  10. Project realization of jet vortex condenser at units 3 and 3 of the Kozloduy NPP

    International Nuclear Information System (INIS)

    Genovski, I.; Grigorov, A; Bonev, B; Sabinov, S.; Petkov, M.

    2003-01-01

    In the implementation of the contract between the Kozloduy NPP and Department 'Thermal and Nuclear Energy' at the Technical University, Sofia a project has been realized for the demonstration of the modernization of the system for accident localization in the units 3 and 4, based on the jet-vortex condenser (JVC). The final result is multimedia presentation in English and Bulgarian languages. In this paper the last part of the project is presented, including: installing of the JVC, auxiliary systems, executors of the project and expert opinions on the projects

  11. Formation of integrated structural units using the systematic and integrated method when implementing high-rise construction projects

    Science.gov (United States)

    Abramov, Ivan

    2018-03-01

    Development of design documentation for a future construction project gives rise to a number of issues with the main one being selection of manpower for structural units of the project's overall implementation system. Well planned and competently staffed integrated structural construction units will help achieve a high level of reliability and labor productivity and avoid negative (extraordinary) situations during the construction period eventually ensuring improved project performance. Research priorities include the development of theoretical recommendations for enhancing reliability of a structural unit staffed as an integrated construction crew. The author focuses on identification of destabilizing factors affecting formation of an integrated construction crew; assessment of these destabilizing factors; based on the developed mathematical model, highlighting the impact of these factors on the integration criterion with subsequent identification of an efficiency and reliability criterion for the structural unit in general. The purpose of this article is to develop theoretical recommendations and scientific and methodological provisions of an organizational and technological nature in order to identify a reliability criterion for a structural unit based on manpower integration and productivity criteria. With this purpose in mind, complex scientific tasks have been defined requiring special research, development of corresponding provisions and recommendations based on the system analysis findings presented herein.

  12. Miniaturized Power Processing Unit Study: A Cubesat Electric Propulsion Technology Enabler Project

    Science.gov (United States)

    Ghassemieh, Shakib M.

    2014-01-01

    This study evaluates High Voltage Power Processing Unit (PPU) technology and driving requirements necessary to enable the Microfluidic Electric Propulsion technology research and development by NASA and university partners. This study provides an overview of the state of the art PPU technology with recommendations for technology demonstration projects and missions for NASA to pursue.

  13. Population Projection. Applications of Linear Algebra to Population Studies. Modules and Monographs in Undergraduate Mathematics and Its Applications. UMAP Module 345.

    Science.gov (United States)

    Keller, Edward L.

    This unit, which looks at applications of linear algebra to population studies, is designed to help pupils: (1) understand an application of matrix algebra to the study of populations; (2) see how knowledge of eigen values and eigen vectors is useful in studying powers of matrices; and (3) be briefly exposed to some difficult but interesting…

  14. Utility-Scale Solar 2014. An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Bolinger, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Seel, Joachim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2015-09-01

    Other than the nine Solar Energy Generation Systems (“SEGS”) parabolic trough projects built in the 1980s, virtually no large-scale or “utility-scale” solar projects – defined here to include any groundmounted photovoltaic (“PV”), concentrating photovoltaic (“CPV”), or concentrating solar thermal power (“CSP”) project larger than 5 MWAC – existed in the United States prior to 2007. By 2012 – just five years later – utility-scale had become the largest sector of the overall PV market in the United States, a distinction that was repeated in both 2013 and 2014 and that is expected to continue for at least the next few years. Over this same short period, CSP also experienced a bit of a renaissance in the United States, with a number of large new parabolic trough and power tower systems – some including thermal storage – achieving commercial operation. With this critical mass of new utility-scale projects now online and in some cases having operated for a number of years (generating not only electricity, but also empirical data that can be mined), the rapidly growing utility-scale sector is ripe for analysis. This report, the third edition in an ongoing annual series, meets this need through in-depth, annually updated, data-driven analysis of not just installed project costs or prices – i.e., the traditional realm of solar economics analyses – but also operating costs, capacity factors, and power purchase agreement (“PPA”) prices from a large sample of utility-scale solar projects in the United States. Given its current dominance in the market, utility-scale PV also dominates much of this report, though data from CPV and CSP projects are presented where appropriate.

  15. Impact of the economic downturn on total joint replacement demand in the United States: updated projections to 2021.

    Science.gov (United States)

    Kurtz, Steven M; Ong, Kevin L; Lau, Edmund; Bozic, Kevin J

    2014-04-16

    Few studies have explored the role of the National Health Expenditure and macroeconomics on the utilization of total joint replacement. The economic downturn has raised questions about the sustainability of growth for total joint replacement in the future. Previous projections of total joint replacement demand in the United States were based on data up to 2003 using a statistical methodology that neglected macroeconomic factors, such as the National Health Expenditure. Data from the Nationwide Inpatient Sample (1993 to 2010) were used with United States Census and National Health Expenditure data to quantify historical trends in total joint replacement rates, including the two economic downturns in the 2000s. Primary and revision hip and knee arthroplasty were identified using codes from the International Classification of Diseases, Ninth Revision, Clinical Modification. Projections in total joint replacement were estimated using a regression model incorporating the growth in population and rate of arthroplasties from 1993 to 2010 as a function of age, sex, race, and census region using the National Health Expenditure as the independent variable. The regression model was used in conjunction with government projections of National Health Expenditure from 2011 to 2021 to estimate future arthroplasty rates in subpopulations of the United States and to derive national estimates. The growth trend for the incidence of joint arthroplasty, for the overall United States population as well as for the United States workforce, was insensitive to economic downturns. From 2009 to 2010, the total number of procedures increased by 6.0% for primary total hip arthroplasty, 6.1% for primary total knee arthroplasty, 10.8% for revision total hip arthroplasty, and 13.5% for revision total knee arthroplasty. The National Health Expenditure model projections for primary hip replacement in 2020 were higher than a previously projected model, whereas the current model estimates for total

  16. Production-history projections of fuels and some crucial metals in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Arndt, R A; Roper, L D

    1977-09-01

    The production-history projection method of the authors is refined to determine the earliest date at which reasonably well-determined depletion parameters can be ascertained. The method is applied to the United States production data for silver, crude oil, natural gas, coal, iron ore, and uranium ore. 13 references.

  17. The projectable hull of an archimedean $ell$-group with weak unit

    Directory of Open Access Journals (Sweden)

    Anthony W. Hager

    2017-07-01

    Full Text Available The much-studied projectable hull of an $ell$-group $Gleq pG$ is an essential extension, so that, in the case that $G$ is  archimedean with weak unit, ``$Gin {bf W}$", we have for the Yosida representation spaces a ``covering map" $YG leftarrow YpG$. We have earlier cite{hkm2} shown that (1 this cover has a characteristic minimality property, and that (2 knowing $YpG$, one can write down $pG$. We now show directly that for $mathscr{A}$, the boolean algebra in the power set of the minimal prime spectrum $Min(G$, generated by the sets $U(g={Pin Min(G:gnotin P}$ ($gin G$, the Stone space $mathcal{A}mathscr{A}$ is a cover of $YG$ with the minimal property of (1; this extends the result from cite{bmmp} for the strong unit case. Then, applying (2 gives the pre-existing description of $pG$, which includes the strong unit description of cite{bmmp}. The present methods are largely topological, involving details of covering maps and Stone duality.

  18. United States Support Programme (USSP): Lessons Learned from the Management of Complex, Multi-Stakeholder Projects for International Safeguards

    International Nuclear Information System (INIS)

    Diaz, R.; Tackentien, J.

    2015-01-01

    This paper will review USSP experiences, lessons learned, and proposed future strategies on the management of complex projects including the Universal Non-Destructive Assay Data Acquisition Platform (UNAP) instrument development task. The focus will be on identifying lessons learned to formulate strategies to minimize risk and maximize the potential of commercial success for future complex projects. Topics planned for inclusion are: 1. Initial agreement amongst all stakeholders on the justification of the need of the development including market studies of existing/near term future COTS technology capabilities; 2. Initial confirmation that there is a market for the product other than the IAEA to reduce investment risk; 3. Agreement on an accelerated initial project schedule from request acceptance to commercial unit production including per unit cost and quantities; 4. During product development, obtaining periodic customer reaffirmation of the need and quantities for the product per the existing schedule and per unit price. (author)

  19. Workforce Projections 2010-2020: Annual Supply and Demand Forecasting Models for Physical Therapists Across the United States.

    Science.gov (United States)

    Landry, Michel D; Hack, Laurita M; Coulson, Elizabeth; Freburger, Janet; Johnson, Michael P; Katz, Richard; Kerwin, Joanne; Smith, Megan H; Wessman, Henry C Bud; Venskus, Diana G; Sinnott, Patricia L; Goldstein, Marc

    2016-01-01

    Health human resources continue to emerge as a critical health policy issue across the United States. The purpose of this study was to develop a strategy for modeling future workforce projections to serve as a basis for analyzing annual supply of and demand for physical therapists across the United States into 2020. A traditional stock-and-flow methodology or model was developed and populated with publicly available data to produce estimates of supply and demand for physical therapists by 2020. Supply was determined by adding the estimated number of physical therapists and the approximation of new graduates to the number of physical therapists who immigrated, minus US graduates who never passed the licensure examination, and an estimated attrition rate in any given year. Demand was determined by using projected US population with health care insurance multiplied by a demand ratio in any given year. The difference between projected supply and demand represented a shortage or surplus of physical therapists. Three separate projection models were developed based on best available data in the years 2011, 2012, and 2013, respectively. Based on these projections, demand for physical therapists in the United States outstrips supply under most assumptions. Workforce projection methodology research is based on assumptions using imperfect data; therefore, the results must be interpreted in terms of overall trends rather than as precise actuarial data-generated absolute numbers from specified forecasting. Outcomes of this projection study provide a foundation for discussion and debate regarding the most effective and efficient ways to influence supply-side variables so as to position physical therapists to meet current and future population demand. Attrition rates or permanent exits out of the profession can have important supply-side effects and appear to have an effect on predicting future shortage or surplus of physical therapists. © 2016 American Physical Therapy

  20. Using the FORE-SCE model to project land-cover change in the southeastern United States

    Science.gov (United States)

    Sohl, Terry; Sayler, Kristi L.

    2008-01-01

    A wide variety of ecological applications require spatially explicit current and projected land-use and land-cover data. The southeastern United States has experienced massive land-use change since European settlement and continues to experience extremely high rates of forest cutting, significant urban development, and changes in agricultural land use. Forest-cover patterns and structure are projected to change dramatically in the southeastern United States in the next 50 years due to population growth and demand for wood products [Wear, D.N., Greis, J.G. (Eds.), 2002. Southern Forest Resource Assessment. General Technical Report SRS-53. U.S. Department of Agriculture, Forest Service, Southern Research Station, Asheville, NC, 635 pp]. Along with our climate partners, we are examining the potential effects of southeastern U.S. land-cover change on regional climate. The U.S. Geological Survey (USGS) Land Cover Trends project is analyzing contemporary (1973-2000) land-cover change in the conterminous United States, providing ecoregion-by-ecoregion estimates of the rates of change, descriptive transition matrices, and changes in landscape metrics. The FORecasting SCEnarios of future land-cover (FORE-SCE) model used Land Cover Trends data and theoretical, statistical, and deterministic modeling techniques to project future land-cover change through 2050 for the southeastern United States. Prescriptions for future proportions of land cover for this application were provided by ecoregion-based extrapolations of historical change. Logistic regression was used to develop relationships between suspected drivers of land-cover change and land cover, resulting in the development of probability-of-occurrence surfaces for each unique land-cover type. Forest stand age was initially established with Forest Inventory and Analysis (FIA) data and tracked through model iterations. The spatial allocation procedure placed patches of new land cover on the landscape until the scenario

  1. Utility-Scale Solar 2013: An empirical analysis of project cost, performance, and pricing trends in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Bolinger, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Weaver, Samantha [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2014-09-17

    Other than the SEGS I-IX parabolic trough projects built in the 1980s, virtually no large-scale or "utility-scale" solar projects-defined here to include any ground-mounted photovoltaic ("PV"), concentrating photovoltaic ("CPV"), or concentrating solar power ("CSP" or solar thermal) project larger than 5 MWAC-existed in the United States prior to 2007.

  2. Futures project anticipates changes and challenges facing forests of the northern United States

    Science.gov (United States)

    Stephen R. Shifley; W. Keith Moser; Michael E. Goerndt; Nianfu Song; Mark D. Nelson; David J. Nowak; Patrick D. Miles; Brett J. Butler; Ryan D. DeSantis; Francisco X. Aguilar; Brian G. Tavernia

    2014-01-01

    The Northern Forest Futures Project aims to reveal how today's trends and choices are likely to change the future forest landscape in the northeastern and midwestern United States. The research is focused on the 20-state quadrant bounded by Maine, Maryland, Missouri, and Minnesota. This area, which encompasses most of the Central Hardwood Forest region, is the...

  3. Projecting changes in regional temperature and precipitation extremes in the United States

    OpenAIRE

    Justin T. Schoof; Scott M. Robeson

    2016-01-01

    Regional and local climate extremes, and their impacts, result from the multifaceted interplay between large-scale climate forcing, local environmental factors (physiography), and societal vulnerability. In this paper, we review historical and projected changes in temperature and precipitation extremes in the United States, with a focus on strengths and weaknesses of (1) commonly used definitions for extremes such as thresholds and percentiles, (2) statistical approaches to quantifying change...

  4. Audit of United States portion of the International Thermonuclear Experimental Reactor project

    International Nuclear Information System (INIS)

    1993-01-01

    Worldwide efforts in fusion energy research are designed to develop fusion power as a safe, environmentally sound, and economically competitive source of energy. The International Thermonuclear Experimental Reactor (ITER) project is a worldwide effort to demonstrate the scientific and technological feasibility of fusion power. The European Community, Japan, the Russian Federation, and the United States are collaborating on ITER, with each of the four parties expected to equally share costs and benefits. Shared costs for the current engineering design phase of the project are estimated at $1 billion in 1989 dollars, excluding certain management and support costs to be absorbed by each partner, with an early estimate of $6 billion, also in 1989 dollars, for construction of the reactor. Engineering design formally began in July 1992, and this phase is in its formative stages. The US had already spent about $100 million since 1987 on ITER conceptual design activities and other preparatory activities in advance of the engineering design phase. Because of its cost significance, the importance of ITER to the US fusion energy program, and the project's unique aspects which may provide a framework for future international endeavors, we initiated an audit of the ITER project. The purpose of the audit was to evaluate management controls over the US portion of the ITER project. Our objectives was to determine whether key front-end controls were in place to ensure that the project could be managed in an efficient and effective manner

  5. Projecting the Effect of Changes in Smoking and Obesity on Future Life Expectancy in the United States

    OpenAIRE

    Preston, Samuel H.; Stokes, Andrew; Mehta, Neil K.; Cao, Bochen

    2013-01-01

    We estimate the effects of declining smoking and increasing obesity on mortality in the United States over the period 2010?2040. Data on cohort behavioral histories are integrated into these estimates. Future distributions of body mass indices are projected using transition matrices applied to the initial distribution in 2010. In addition to projections of current obesity, we project distributions of obesity when cohorts are age 25. To these distributions, we apply death rates by current and ...

  6. Projected climate change impacts on skiing and snowmobiling: A case study of the United States

    Science.gov (United States)

    A physically-based water and energy balance model is used to simulate natural snow accumulation at 247 winter recreation locations across the continental United States. We combine this model with projections of snowmaking conditions to determine downhill skiing, cross-country ski...

  7. Projecting climate effects on birds and reptiles of the Southwestern United States

    Science.gov (United States)

    van Riper, Charles; Hatten, James R.; Giermakowski, J. Tomasz; Mattson, David; Holmes, Jennifer A.; Johnson, Matthew J.; Nowak, Erika M.; Ironside, Kirsten; Peters, Michael; Heinrich, Paul; Cole, K.L.; Truettner, C.; Schwalbe, Cecil R.

    2014-01-01

    We modeled the current and future breeding ranges of seven bird and five reptile species in the Southwestern United States with sets of landscape, biotic (plant), and climatic global circulation model (GCM) variables. For modeling purposes, we used PRISM data to characterize the climate of the Western United States between 1980 and 2009 (baseline for birds) and between 1940 and 2009 (baseline for reptiles). In contrast, we used a pre-selected set of GCMs that are known to be good predictors of southwestern climate (five individual and one ensemble GCM), for the A1B emission scenario, to characterize future climatic conditions in three time periods (2010–39; 2040–69; and, 2070–99). Our modeling approach relied on conceptual models for each target species to inform selection of candidate explanatory variables and to interpret the ecological meaning of developed probabilistic distribution models. We employed logistic regression and maximum entropy modeling techniques to create a set of probabilistic models for each target species. We considered climatic, landscape, and plant variables when developing and testing our probabilistic models. Climatic variables included the maximum and minimum mean monthly and seasonal temperature and precipitation for three time periods. Landscape features included terrain ruggedness and insolation. We also considered plant species distributions as candidate explanatory variables where prior ecological knowledge implicated a strong association between a plant and animal species. Projected changes in range varied widely among species, from major losses to major gains. Breeding bird ranges exhibited greater expansions and contractions than did reptile species. We project range losses for Williamson’s sapsucker and pygmy nuthatch of a magnitude that could move these two species close to extinction within the next century. Although both species currently have a relatively limited distribution, they can be locally common, and neither

  8. Integrating Forage, Wildlife, Water, and Fish Projections with Timber Projections at the Regional Level: A Case Study in Southern United States

    Science.gov (United States)

    Linda A. Joyce; Curtis H. Flather; Patricia A. Flebbe; Thomas W. Hoekstra; Stan J. Ursic

    1990-01-01

    The impact of timber management and land-use change on forage production, turkey and deer abundance, red-cockaded woodpecker colonies, water yield, and trout abundance was projected as part of a policy study focusing on the southern United States. The multiresource modeling framework used in this study linked extant timber management and land-area policy models with...

  9. Detector Unit

    CERN Multimedia

    1960-01-01

    Original detector unit of the Instituut voor Kernfysisch Onderzoek (IKO) BOL project. This detector unit shows that silicon detectors for nuclear physics particle detection were already developed and in use in the 1960's in Amsterdam. Also the idea of putting 'strips' onto the silicon for high spatial resolution of a particle's impact on the detector were implemented in the BOL project which used 64 of these detector units. The IKO BOL project with its silicon particle detectors was designed, built and operated from 1965 to roughly 1977. Detector Unit of the BOL project: These detectors, notably the ‘checkerboard detector’, were developed during the years 1964-1968 in Amsterdam, The Netherlands, by the Natuurkundig Laboratorium of the N.V. Philips Gloeilampen Fabrieken. This was done in close collaboration with the Instituut voor Kernfysisch Onderzoek (IKO) where the read-out electronics for their use in the BOL Project was developed and produced.

  10. Second unit scheduling concerns on a dual-unit nuclear project

    International Nuclear Information System (INIS)

    Block, H.R.; Mazzini, R.A.

    1978-01-01

    This paper explores the planning and scheduling problems of Unit 2 of the Susquehanna steam electric station. The causes of these problems and methods to avoid or mitigate their consequences are discussed. The Susquehanna steam electric station has two boiling water reactors rated at 1,100 MW each. Topics considered include cost factors, structures, equipment, engineering and home office, construction services, completion data phasing, work sequencing, structural dependences, and segregation. Substatial cost and schedule benefits can result if two nuclear units are designed and constructed as one integral station, and if maximum sharing of facilities and services between the units occurs. It is concluded that the cost benefits of highly integrated dual unit construction outweigh the schedule and logistical problems caused by that approach

  11. The application of projected conjugate gradient solvers on graphical processing units

    International Nuclear Information System (INIS)

    Lin, Youzuo; Renaut, Rosemary

    2011-01-01

    Graphical processing units introduce the capability for large scale computation at the desktop. Presented numerical results verify that efficiencies and accuracies of basic linear algebra subroutines of all levels when implemented in CUDA and Jacket are comparable. But experimental results demonstrate that the basic linear algebra subroutines of level three offer the greatest potential for improving efficiency of basic numerical algorithms. We consider the solution of the multiple right hand side set of linear equations using Krylov subspace-based solvers. Thus, for the multiple right hand side case, it is more efficient to make use of a block implementation of the conjugate gradient algorithm, rather than to solve each system independently. Jacket is used for the implementation. Furthermore, including projection from one system to another improves efficiency. A relevant example, for which simulated results are provided, is the reconstruction of a three dimensional medical image volume acquired from a positron emission tomography scanner. Efficiency of the reconstruction is improved by using projection across nearby slices.

  12. The application of projected conjugate gradient solvers on graphical processing units

    Energy Technology Data Exchange (ETDEWEB)

    Lin, Youzuo [Los Alamos National Laboratory; Renaut, Rosemary [ARIZONA STATE UNIV.

    2011-01-26

    Graphical processing units introduce the capability for large scale computation at the desktop. Presented numerical results verify that efficiencies and accuracies of basic linear algebra subroutines of all levels when implemented in CUDA and Jacket are comparable. But experimental results demonstrate that the basic linear algebra subroutines of level three offer the greatest potential for improving efficiency of basic numerical algorithms. We consider the solution of the multiple right hand side set of linear equations using Krylov subspace-based solvers. Thus, for the multiple right hand side case, it is more efficient to make use of a block implementation of the conjugate gradient algorithm, rather than to solve each system independently. Jacket is used for the implementation. Furthermore, including projection from one system to another improves efficiency. A relevant example, for which simulated results are provided, is the reconstruction of a three dimensional medical image volume acquired from a positron emission tomography scanner. Efficiency of the reconstruction is improved by using projection across nearby slices.

  13. Well Completion Report for Corrective Action Unit 447, Project Shoal Area, Churchill County, Nevada

    International Nuclear Information System (INIS)

    Rick Findlay

    2006-01-01

    This Well Completion Report is being provided as part of the implementation of the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit (CAU) 447 (NNSA/NSO, 2006a). The CADD/CAP is part of an ongoing U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) funded project for the investigation of CAU 447 at the Project Shoal Area (PSA). All work performed on this project was conducted in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996), and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. Investigation activities included the drilling, construction, and development of three monitoring/validation (MV) wells at the PSA. This report summarizes the field activities and data collected during the investigation

  14. Nuclear Deterrence. Applications of Elementary Probability to International Relations. Modules and Monographs in Undergraduate Mathematics and Its Applications Project. UMAP Unit 327.

    Science.gov (United States)

    Smith, Harvey A.

    This module is designed to apply mathematical models to nuclear deterrent problems, and to aid users in developing enlightened skepticism about the use of linear models in stability analyses and long-term predictions. An attempt is made at avoiding overwhelming complexities through concentration on land-based missile forces. It is noted that after…

  15. Effects of recent energy system changes on CO2 projections for the United States.

    Science.gov (United States)

    Lenox, Carol S; Loughlin, Daniel H

    2017-09-21

    Recent projections of future United States carbon dioxide (CO 2 ) emissions are considerably lower than projections made just a decade ago. A myriad of factors have contributed to lower forecasts, including reductions in end-use energy service demands, improvements in energy efficiency, and technological innovations. Policies that have encouraged these changes include renewable portfolio standards, corporate vehicle efficiency standards, smart growth initiatives, revisions to building codes, and air and climate regulations. Understanding the effects of these and other factors can be advantageous as society evaluates opportunities for achieving additional CO 2 reductions. Energy system models provide a means to develop such insights. In this analysis, the MARKet ALlocation (MARKAL) model was applied to estimate the relative effects of various energy system changes that have happened since the year 2005 on CO 2 projections for the year 2025. The results indicate that transformations in the transportation and buildings sectors have played major roles in lowering projections. Particularly influential changes include improved vehicle efficiencies, reductions in projected travel demand, reductions in miscellaneous commercial electricity loads, and higher efficiency lighting. Electric sector changes have also contributed significantly to the lowered forecasts, driven by demand reductions, renewable portfolio standards, and air quality regulations.

  16. Multi-project, multi-national, geographically dispersed: Challenges for the Nuclear Renaissance in the United States

    International Nuclear Information System (INIS)

    Mathews, T.A.

    2007-01-01

    The nuclear renaissance in the United States is moving at a rapid pace due to the incentives in the Energy Policy Act of 2005, recognition of the environmental benefits of nuclear energy, and the need for stable, reliable, and diverse sources of energy. The U.S. is looking externally to capitalize on French, German, Japanese, and other worldwide experience. A number of challenges to the resurgence of nuclear power are common worldwide, including project management, workforce and supplier availability and large-project construction management experience. For example, AREVA's new plant project teams are comprised of resources drawn from various U.S. centers of technical expertise and backed up by AREVA's worldwide capabilities. However, the challenge lies in having the information infrastructure in place to integrate that expertise and share information across working groups. In another example, the U.S. regulatory process has changed significantly for the better, but the new streamlined combined license process has not been tested. Reactor vendors and utilities have injected new thinking into the process by pursuing Design Certification, Early Site Permit, and Combined License approval in parallel rather than in series. This paper will discuss these and other challenges to licensing and building new nuclear plants, and the approaches being used by AREVA to lead the Nuclear Renaissance in the United States. (author)

  17. Statistical analysis of the vibration loading of the reactor internals and fuel assemblies of reactor units type WWER-440 from deferent projects

    International Nuclear Information System (INIS)

    Ovcharov, O.; Pavelko, V.; Usanov, A.; Arkadov, G.; Dolgov, A.; Molchanov, V.; Anikeev, J.; Pljush, A.

    2006-01-01

    In this paper the following items have been presented: 1) Vibration noise instrument channels; 2) Vibration loading characteristics of control assemblies, internals and design peculiarities of internals of WWER-440 deferent projects; 3) Coolant flow rate through the reactor, reactor core, fuel assemblies and control assemblies for different projects WWER-440 and 4) Noise measurements of coolant speed per channel. The change of auto power spectrum density of absolute displacement detector signal for the last 12 years of SUS monitoring of the Kola NPP unit 2; the coherence functions groups between two SPND of the same level for the Kola NPP unit 1; the measured coolant flow rate at Paks NPP and the auto power spectrum density group of SPND signals from 11 neutron measuring channels of the Kola NPP unit 1 are given. The main factors of vibration loading of internals and fuel assemblies for Kola NPP units 1-4, Bohunice NPP units 1 and 2 and Novovoronezh NPP units 3 and 4 are also discussed

  18. Project Notes

    Science.gov (United States)

    School Science Review, 1978

    1978-01-01

    Presents sixteen project notes developed by pupils of Chipping Norton School and Bristol Grammar School, in the United Kingdom. These Projects include eight biology A-level projects and eight Chemistry A-level projects. (HM)

  19. Effects of energy system changes on CO2 projections for the United States_data tables with data dictionary

    Data.gov (United States)

    U.S. Environmental Protection Agency — Dataset that corresponds to paper titled Effects of recent energy system changes on CO2 projections for the United States. This dataset is associated with the...

  20. Systems Maturity Assessment of the Lithium Ion Battery for Extravehicular Mobility Unit Project

    Science.gov (United States)

    Russell, Samuel P.

    2011-01-01

    The Long Life (Lithium Ion) Battery (LLB/LIB) is designed to replace the current Extravehicular Mobility Unit (EMU) Silver/Zinc (Ag/Zn) Increased Capacity Battery (ICB), which is used to provide power to the Primary Life Support Subsystem (PLSS) during Extravehicular Activities (EVAs). The LLB (a battery based on commercial lithium ion cell technology) is designed to have the same electrical and mechanical interfaces as the current ICB. The EMU LIB Charger is designed to charge, discharge, and condition the LLB either in a charger-strapped configuration or in an EMU-mounted configuration. This paper will retroactively apply the principles of Systems Maturity Assessment to the LLB project through use of the Integration Readiness Level and Earned Readiness Management. The viability of this methodology will be considered for application to new and existing technology development projects.

  1. Falls prevention in hospitals and mental health units: an extended evaluation of the FallSafe quality improvement project.

    Science.gov (United States)

    Healey, Frances; Lowe, Derek; Darowski, Adam; Windsor, Julie; Treml, Jonathan; Byrne, Lisa; Husk, Janet; Phipps, Jill

    2014-07-01

    inpatient falls are a major patient safety issue causing distress, injury and death. Systematic review suggests multifactorial assessment and intervention can reduce falls by 20-30%, but large-scale studies of implementation are few. This paper describes an extended evaluation of the FallSafe quality improvement project, which presented key components of multifactorial assessment and intervention as a care bundle. : data on delivery of falls prevention processes were collected at baseline and for 18 months from nine FallSafe units and nine control units. Data on falls were collected from local risk management systems for 24 months, and data on under-reporting through staff surveys. : in FallSafe units, delivery of seven care bundle components significantly improved; most improvements were sustained after active project support was withdrawn. Twelve-month moving average of reported fall rates showed a consistent downward trend in FallSafe units but not controls. Significant reductions in reported fall rate were found in FallSafe units (adjusted rate ratio (ARR) 0.75, 95% confidence interval (CI) 0.68-0.84 P control units (ARR 0.91, 95% CI 0.81-1.03 P = 0.13). No significant changes in injurious fall rate were found in FallSafe units (ARR 0.86, 95% CI 0.71-1.03 P = 0.11), or controls (ARR 0.88, 95% CI 0.72-1.08 P = 0.13). In FallSafe units, staff certain falls had been reported increased from 60 to 77%. : introducing evidence-based care bundles of multifactorial assessment and intervention using a quality improvement approach resulted in improved delivery of multifactorial assessment and intervention and significant reductions in fall rates, but not in injurious fall rates. © The Author 2013. Published by Oxford University Press on behalf of the British Geriatrics Society. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  2. 75 FR 60093 - Record of Decision for the United States Marine Corps Basewide Utilities Infrastructure Project...

    Science.gov (United States)

    2010-09-29

    ... Basewide Utilities Infrastructure Project at Marine Corps Base Camp Pendleton, CA AGENCY: Department of the... Environmental Policy Act (NEPA) of 1969, 42 United States Code (U.S.C.) Section 4332(2)(c), the regulations of the Council on Environmental Quality (CEQ) for Implementing the Procedural Provisions of NEPA (40 Code...

  3. An agent based architecture for high-risk neonate management at neonatal intensive care unit.

    Science.gov (United States)

    Malak, Jaleh Shoshtarian; Safdari, Reza; Zeraati, Hojjat; Nayeri, Fatemeh Sadat; Mohammadzadeh, Niloofar; Farajollah, Seide Sedighe Seied

    2018-01-01

    In recent years, the use of new tools and technologies has decreased the neonatal mortality rate. Despite the positive effect of using these technologies, the decisions are complex and uncertain in critical conditions when the neonate is preterm or has a low birth weight or malformations. There is a need to automate the high-risk neonate management process by creating real-time and more precise decision support tools. To create a collaborative and real-time environment to manage neonates with critical conditions at the NICU (Neonatal Intensive Care Unit) and to overcome high-risk neonate management weaknesses by applying a multi agent based analysis and design methodology as a new solution for NICU management. This study was a basic research for medical informatics method development that was carried out in 2017. The requirement analysis was done by reviewing articles on NICU Decision Support Systems. PubMed, Science Direct, and IEEE databases were searched. Only English articles published after 1990 were included; also, a needs assessment was done by reviewing the extracted features and current processes at the NICU environment where the research was conducted. We analyzed the requirements and identified the main system roles (agents) and interactions by a comparative study of existing NICU decision support systems. The Universal Multi Agent Platform (UMAP) was applied to implement a prototype of our multi agent based high-risk neonate management architecture. Local environment agents interacted inside a container and each container interacted with external resources, including other NICU systems and consultation centers. In the NICU container, the main identified agents were reception, monitoring, NICU registry, and outcome prediction, which interacted with human agents including nurses and physicians. Managing patients at the NICU units requires online data collection, real-time collaboration, and management of many components. Multi agent systems are applied as

  4. Environmental Control Unit Harness Project

    Science.gov (United States)

    Oliva-Buisson, Yvette J.

    2014-01-01

    Testing four new Environmental Control Unit Harnesses for improved user comfort during SCAPE operations. Phase I, testing in a lab environment, Phase II will continue testing the best candidates in a field environment.

  5. Personalizing death in the intensive care unit: the 3 Wishes Project: a mixed-methods study.

    Science.gov (United States)

    Cook, Deborah; Swinton, Marilyn; Toledo, Feli; Clarke, France; Rose, Trudy; Hand-Breckenridge, Tracey; Boyle, Anne; Woods, Anne; Zytaruk, Nicole; Heels-Ansdell, Diane; Sheppard, Robert

    2015-08-18

    Dying in the complex, efficiency-driven environment of the intensive care unit can be dehumanizing for the patient and have profound, long-lasting consequences for all persons attendant to that death. To bring peace to the final days of a patient's life and to ease the grieving process. Mixed-methods study. 21-bed medical-surgical intensive care unit. Dying patients and their families and clinicians. To honor each patient, a set of wishes was generated by patients, family members, or clinicians. The wishes were implemented before or after death by patients, families, clinicians (6 of whom were project team members), or the project team. Quantitative data included demographic characteristics, processes of care, and scores on the Quality of End-of-Life Care-10 instrument. Semistructured interviews of family members and clinicians were transcribed verbatim, and qualitative description was used to analyze them. Participants included 40 decedents, at least 1 family member per patient, and 3 clinicians per patient. The 159 wishes were implemented and classified into 5 categories: humanizing the environment, tributes, family reconnections, observances, and "paying it forward." Scores on the Quality of End-of-Life Care-10 instrument were high. The central theme from 160 interviews of 170 persons was how the 3 Wishes Project personalized the dying process. For patients, eliciting and customizing the wishes honored them by celebrating their lives and dignifying their deaths. For families, it created positive memories and individualized end-of-life care for their loved ones. For clinicians, it promoted interprofessional care and humanism in practice. Impaired consciousness limited understanding of patients' viewpoints. The 3 Wishes Project facilitated personalization of the dying process through explicit integration of palliative and spiritual care into critical care practice. Hamilton Academy of Health Science Research Organization, Canadian Intensive Care Foundation.

  6. Developing collaborative person-centred practice: a pilot project on a palliative care unit.

    Science.gov (United States)

    Hall, Pippa; Weaver, Lynda; Gravelle, Debbie; Thibault, Hélène

    2007-02-01

    Maximizing interprofessional collaborative patient-centred practice holds promise for improving patient care and creating satisfying work roles. In Canada's evolving health care system, there are demands for increased efficiency, cost-effectiveness, and quality improvement. Interprofessional collaboration warrants re-examination because maximizing interprofessional collaboration, especially nurse-physician collaboration, holds promise for improving patient care and creating satisfying work roles. A palliative care team seized the opportunity to pilot a different approach to patient and family care when faced with a reduction in medical staff. Grounded in a collaborative patient-centred practice approach, the Canadian Hospice Palliative Care Association's National Model to Guide Hospice Palliative Care (2002), and outcomes from program retreats and workgroups, a collaborative person-centred model of care was developed for a 12-bed pilot project. Preliminary findings show that the pilot project team perceived some specific benefits in continuity of care and interprofessional collaboration, while the presence of the physician was reduced to an average of 3.82 hours on the pilot wing, compared with 8 hours on the non-pilot wings. This pilot study suggests that a person-centred model, when focused on the physician-nurse dyad, may offer improved efficiency, job satisfaction and continuity of care on a palliative care unit. Incorporating all team members and developing strategies to successfully expand the model across the whole unit are the next challenges. Further research into the impact of these changes on the health care professionals, management and patients and families is essential.

  7. Demands on project management of comprehensive modernization projects in the electrical systems area. Example of modernization of electrical systems of Kozloduy NPP Unit 5 and 6

    International Nuclear Information System (INIS)

    Stinshoff, Helmut; Weber, Patrick

    2006-01-01

    In nuclear power plants, station supply with electric energy must be guaranteed any time. This applies in particular also during the implementation of complex electrical systems modernization projects. Highest demands on the project management, extensive experience and system knowledge are required. In the frame of the Modernization Program for the nuclear power plant Kozloduy unit 5 and 6 in Bulgaria Framatome ANP has approved its ability to implement a large scope of modernization measures during the refueling outages of the years 2003 to 2005. The Contract of the Modernization Program for the European Consortium Kozloduy (Framatome ANP, Atomenergoexport) was signed in July 1999 and became effective in June 2001. The project will be finished by May 2006, with the approval of the Updated Final Safety Analysis Report. The scope of hardware work has been implemented within 6 plant outages during the years 2002 to 2005. The focus of the Modernization Program is mainly oriented to nuclear safety aspects, with the aim of upgrading of the Units to a high safety level in compliance with international practice. A further section of the project is dedicated to upgrading of operational equipment. Framatome ANP personnel have shown that besides the technical challenges which had to be faced, also the intercultural and language barriers were successfully overcome. The good teamwork between the partners of the Consortium ECK, its Bulgarian subcontractors and with Kozloduy plant personnel has been an important success factor. (authors)

  8. Decree 328/003. Is approve the organizational structure reformulation project of the regulatory unit of Unit 006 Energy and water services of subsection 02 Presidency of the Republic

    International Nuclear Information System (INIS)

    2003-01-01

    This decree approve the organizational structure project of The regulatory energy and water services ( URSEA). This unit is responsible for monitoring the activities related to electricity, gas, drinking water, sanitation and oil, fuel and other hydrocarbon derivatives

  9. Utility-Scale Solar 2015: An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Bolinger, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Environmental Energy Technologies Division; Seel, Joachim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Environmental Energy Technologies Division

    2016-08-17

    The utility-scale solar sector—defined here to include any ground-mounted photovoltaic (“PV”), concentrating photovoltaic (“CPV”), or concentrating solar power (“CSP”) project that is larger than 5 MWAC in capacity—has led the overall U.S. solar market in terms of installed capacity since 2012. It is expected to maintain its market-leading position for at least another five years, driven in part by December 2015’s three-year extension of the 30% federal investment tax credit (“ITC”) through 2019 (coupled with a favorable switch to a “start construction” rather than a “placed in service” eligibility requirement, and a gradual phase down of the credit to 10% by 2022). In fact, in 2016 alone, the utility-scale sector is projected to install more than twice as much new capacity as it ever has previously in a single year. This unprecedented boom makes it difficult, yet more important than ever, to stay abreast of the latest utility-scale market developments and trends. This report—the fourth edition in an ongoing annual series—is intended to help meet this need, by providing in-depth, annually updated, data-driven analysis of the utility-scale solar project fleet in the United States. Drawing on empirical project-level data from a wide range of sources, this report analyzes not just installed project costs or prices—i.e., the traditional realm of most solar economic analyses—but also operating costs, capacity factors, and power purchase agreement (“PPA”) prices from a large sample of utility-scale solar projects throughout the United States. Given its current dominance in the market, utility-scale PV also dominates much of this report, though data from CPV and CSP projects are also presented where appropriate.

  10. Terms, Trends, and Insights: PV Project Finance in the United States, 2017

    Energy Technology Data Exchange (ETDEWEB)

    Feldman, David J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Schwabe, Paul D [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-10-23

    This brief is a compilation of data points and market insights that reflect the state of the project finance market for solar photovoltaic (PV) assets in the United States as of the third quarter of 2017. This information can generally be used as a simplified benchmark of the costs associated with securing financing for solar PV as well as the cost of the financing itself (i.e., the cost of capital). This work represents the second DOE sponsored effort to benchmark financing costs across the residential, commercial, and utility-scale PV markets, as part of its larger effort to benchmark the components of PV system costs.

  11. Technical specifications, South Texas Project, Unit No. 1 (Docket No. 50-498): Appendix ''A'' to License No. NPF-71

    International Nuclear Information System (INIS)

    1987-08-01

    This report presents specifications for the South Texas Project, Unit No. 1 concerning: safety limits, and limiting safety system settings; limiting conditions for operation and surveillance requirements; design features; and administrative controls

  12. United Nations Environment Programme Capacity Building Pilot Project - Training on persistent organic pollutant analysis under the Stockholm Convention

    NARCIS (Netherlands)

    de Boer, J.; Leslie, H.A.; van Leeuwen, S.P.J.; Wegener, J.W.M.; van Bavel, B; Lindstrom, G.; Lahoutifard, N.; Fiedler, H.

    2008-01-01

    Within the framework of a United Nations Environment Programme (UNEP) Capacity Building Project for training of laboratory staff in developing countries on persistent organic pollutant (POP) analysis, an interlaboratory study was organised following an initial evaluation of the performance of

  13. MILA Antenna Control Unit Replacement Project

    Science.gov (United States)

    Bresette, Jeremy

    2007-01-01

    The Air to Ground Subsystem (AGS) Antenna Control Units at the MILA Ground Network Tracking Station are at end-of-life and are being replaced. AGS consists of two antennas at MILA (Quad-Helix and Teltrac). Software was taken from the existing Subsystem Controller and modified for the Antenna Control Unit (ACU). The software is capable of receiving and sending commands to and from the ACU. Moving the azimuth clockwise, counterclockwise, moving the elevation up or down, turning servo power on and off, and inputting azimuth and elevation angles are commands that the antenna can receive.

  14. Projected 21st century climate change for wolverine habitats within the contiguous United States

    Energy Technology Data Exchange (ETDEWEB)

    Peacock, Synte, E-mail: synte@ucar.edu [National Center for Atmospheric Research, 1850 Table Mesa Drive, Boulder, CO 80305 (United States)

    2011-01-15

    Ensembles of 21st century climate projections made using a state of the art global climate model are analyzed to explore possible changes in spring snow cover and summer air temperature in present-day wolverine habitats in the contiguous United States (US). Projected changes in both snow cover and temperature are presented for a range of future emissions scenarios, and implications for the continued survival of the wolverine in the contiguous US are discussed. It is shown that under a high or medium-low emissions scenario there are likely to be dramatic reductions in spring snow cover in present-day wolverine habitats. Under these scenarios there is also likely to be a concomitant increase in summer-time temperatures, with projected maximum daily August temperatures far above those currently tolerated by the wolverine. It is likely that the wolverine, with its many adaptations for cold weather and deep snow pack, would have great difficulty adapting to such changes. The results of the simulations presented here suggest that the very low numbers of wolverines currently living in the contiguous US will likely further decline in response to the deterioration of their habitat in coming decades.

  15. Projected 21st century climate change for wolverine habitats within the contiguous United States

    International Nuclear Information System (INIS)

    Peacock, Synte

    2011-01-01

    Ensembles of 21st century climate projections made using a state of the art global climate model are analyzed to explore possible changes in spring snow cover and summer air temperature in present-day wolverine habitats in the contiguous United States (US). Projected changes in both snow cover and temperature are presented for a range of future emissions scenarios, and implications for the continued survival of the wolverine in the contiguous US are discussed. It is shown that under a high or medium-low emissions scenario there are likely to be dramatic reductions in spring snow cover in present-day wolverine habitats. Under these scenarios there is also likely to be a concomitant increase in summer-time temperatures, with projected maximum daily August temperatures far above those currently tolerated by the wolverine. It is likely that the wolverine, with its many adaptations for cold weather and deep snow pack, would have great difficulty adapting to such changes. The results of the simulations presented here suggest that the very low numbers of wolverines currently living in the contiguous US will likely further decline in response to the deterioration of their habitat in coming decades.

  16. Implementing Family Meetings Into a Respiratory Care Unit: A Care and Communication Quality Improvement Project.

    Science.gov (United States)

    Loeslie, Vicki; Abcejo, Ma Sunnimpha; Anderson, Claudia; Leibenguth, Emily; Mielke, Cathy; Rabatin, Jeffrey

    Substantial evidence in critical care literature identifies a lack of quality and quantity of communication between patients, families, and clinicians while in the intensive care unit. Barriers include time, multiple caregivers, communication skills, culture, language, stress, and optimal meeting space. For patients who are chronically critically ill, the need for a structured method of communication is paramount for discussion of goals of care. The objective of this quality improvement project was to identify barriers to communication, then develop, implement, and evaluate a process for semistructured family meetings in a 9-bed respiratory care unit. Using set dates and times, family meetings were offered to patients and families admitted to the respiratory care unit. Multiple avenues of communication were utilized to facilitate attendance. Utilizing evidence-based family meeting literature, a guide for family meetings was developed. Templates were developed for documentation of the family meeting in the electronic medical record. Multiple communication barriers were identified. Frequency of family meeting occurrence rose from 31% to 88%. Staff satisfaction with meeting frequency, meeting length, and discussion of congruent goals of care between patient/family and health care providers improved. Patient/family satisfaction with consistency of message between team members; understanding of medications, tests, and dismissal plan; and efficacy to address their concerns with the medical team improved. This quality improvement project was implemented to address the communication gap in the care of complex patients who require prolonged hospitalizations. By identifying this need, engaging stakeholders, and developing a family meeting plan to meet to address these needs, communication between all members of the patient's care team has improved.

  17. Well Completion Report for Corrective Action Unit 447, Project Shoal Area, Churchill County, Nevada, Rev. No.: 0

    Energy Technology Data Exchange (ETDEWEB)

    Rick Findlay

    2006-09-01

    This Well Completion Report is being provided as part of the implementation of the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit (CAU) 447 (NNSA/NSO, 2006a). The CADD/CAP is part of an ongoing U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) funded project for the investigation of CAU 447 at the Project Shoal Area (PSA). All work performed on this project was conducted in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996), and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. Investigation activities included the drilling, construction, and development of three monitoring/validation (MV) wells at the PSA. This report summarizes the field activities and data collected during the investigation.

  18. Analogue to digital upgrade project-boiler feedwater control system for Bruce Power nuclear units 1 & 2

    International Nuclear Information System (INIS)

    Long, R.

    2012-01-01

    Bruce Power Nuclear Generating Station A, “Bruce A” is in the final stages of its Restart Project. This capital project will see a large scale rehabilitation of Units 1 and 2 resulting in addition of 1500MW of safe, reliable, clean electricity to the Ontario grid. Restart Project Scope 375, Boiler Feedwater Controls Upgrade was sanctioned to replace obsolete analog devices with a modern digital control system. This project replaced the existing Foxboro H Line analog controls which comprised of 81 individual control modules and support instrumentation. The replacement system was a Triconex Triple Modular Redundant PLC which interfaces with two redundant touch screen monitors. The upgraded digital system incorporates the following controls: 1. Boiler Level Control Loops 2. Dearator Level Control Loops 3. Dearator Pressure Control Loops 4. Boiler Feedwater Recirculation Flow Control Loops A number of technical challenges were addressed when installing a new digital system within the existing plant configuration. Interfaces to new, old and refurbished field devices must be understood as well as implications of connecting to the plant’s Digital Control Computers (DCC’s) and newly installed Steam Generators. The overall project involved many stakeholders to address various requirements from conceptual / design stage through procurement, construction, commissioning and return to service. In addition, the project highlighted the unique requirements found in Nuclear Industry with respect to Human Factors and Software Quality Assurance. (author)

  19. The RECALCAR Project. Healthcare in the Cardiology Units of the Spanish National Health System, 2011 to 2014.

    Science.gov (United States)

    Íñiguez Romo, Andrés; Bertomeu Martínez, Vicente; Rodríguez Padial, Luis; Anguita Sánchez, Manuel; Ruiz Mateas, Francisco; Hidalgo Urbano, Rafael; Bernal Sobrino, José Luis; Fernández Pérez, Cristina; Macaya de Miguel, Carlos; Elola Somoza, Francisco Javier

    2017-07-01

    The RECALCAR project (Spanish acronym for Resources and Quality in Cardiology Units) uses 2 data sources: a survey of cardiology units and an analysis of the Minimum Basic Data set of all hospital discharges of the Spanish National Health System. From 2011 to 2014, there was marked stability in all indicators of the availability, utilization, and productivity of cardiology units. There was significant variability between units and between the health services of the autonomous communities. There was poor implementation of process management (only 14% of the units) and scarce development of health care networks (17%). Structured cardiology units tended to have better results, in terms of both quality and efficiency. No significant differences were found between the different types of unit in the mean length of stay (5.5±1.1 days) or the ratio between successive and first consultations (2:1). The mean discharge rate was 5/1000 inhabitants/y and the mean rate of initial consultations was 16±4/1000 inhabitants/y. No duty or on-call cardiologist was available in 30% of cardiology units with 24 or more beds; of these, no critical care beds were available in 45%. Our findings support the recommendation to regionalize cardiology care and to promote the development of cardiology unit networks. Copyright © 2017 Sociedad Española de Cardiología. Published by Elsevier España, S.L.U. All rights reserved.

  20. The Auto Industry. Grade Nine. Resource Unit (Unit IV). Project Social Studies.

    Science.gov (United States)

    Minnesota Univ., Minneapolis. Project Social Studies Curriculum Center.

    Unit four of this curriculum plan for ninth grade social studies outlines a study of the automobile industry in the United States. Objectives state the desired generalizations, skills, and attitudes to be developed. A condensed outline of course content precedes expanded guidelines for teaching procedures and suggested resource materials. A…

  1. A method for projecting full-scale performance of CO/sub 2/ flooding in the Willard Unit

    International Nuclear Information System (INIS)

    Bilhartz, H.L.; Charlson, G.S.; Stalkup, F.I.; Miller, C.C.

    1985-01-01

    A non-producing CO/sub 2/ flood tertiary recovery test was recently completed in the Willard Unit of Wasson Field. Flood responses during waterflood and alternate injection of CO/sub 2/ and water were monitored at a logging observation well using compensated neutron and pulsed neutron logs. A pressure core was taken to measure residual oil saturations at the test conclusion. The overall objective of the testing was to obtain information for evaluating the potential for full-scale CO/sub 2/ flooding in the unit. Out method for making this evaluation involves: (1) defining CO/sub 2/ flood displacement efficiency and representing this efficiency in a miscible flood reservoir simulator; (2) defining a representative average reservoir description; and (3) projecting full-scale CO/sub 2/ flood performance with the simulator. The paper provides a status report on progress to assess CO/sub 2/ flooding potential for the Willard Unit in this manner

  2. 75 FR 2463 - Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers...

    Science.gov (United States)

    2010-01-15

    ... be considered a breach of contract and shall not entitle the Contractor to a price adjustment under... constitute a breach of this contract and shall not entitle the Contractor to any price adjustment under the... Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers Clauses...

  3. Utility-Scale Solar 2016: An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Bolinger, Mark; Seel, Joachim; LaCommare, Kristina Hamachi

    2017-09-19

    The utility-scale solar sector has led the overall U.S. solar market in terms of installed capacity since 2012. In 2016, the utility-scale sector installed more than 2.5 times as much new capacity as did the residential and commercial sectors combined, and is expected to maintain its dominant position for at least another five years. This report—the fifth edition in an ongoing annual series—provides data-driven analysis of the utility-scale solar project fleet in the United States. We analyze not just installed project prices, but also operating costs, capacity factors, and power purchase agreement ("PPA") prices from a large sample of utility-scale PV and CSP projects throughout the United States. Highlights from this year's edition include the following: Installation Trends: The use of solar tracking devices dominated 2016 installations, at nearly 80% of all new capacity. In a reflection of the ongoing geographic expansion of the market beyond California and the Southwest, the median long-term average insolation level at newly built project sites declined again in 2016. While new fixed-tilt projects are now seen predominantly in less-sunny regions, tracking projects are increasingly pushing into these same regions. The median inverter loading ratio has stabilized in 2016 at 1.3 for both tracking and fixed-tilt projects. Installed Prices: Median installed PV project prices within a sizable sample have fallen by two-thirds since the 2007-2009 period, to $2.2/WAC (or $1.7/WDC) for projects completed in 2016. The lowest 20th percentile of projects within our 2016 sample were priced at or below $2.0/WAC, with the lowest-priced projects around $1.5/WAC. Overall price dispersion across the entire sample and across geographic regions decreased significantly in 2016. Operation and Maintenance (“O&M”) Costs: What limited empirical O&M cost data are publicly available suggest that PV O&M costs were in the neighborhood of $18/kWAC-year, or $8/MWh, in 2016. These

  4. Licensing Status of New and Expanding In-Situ Recovery Uranium Projects in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Catchpole, G.; Thomas, M., E-mail: gccatchpole@uranerz.com [Uranerz Energy Corporation (URZ), Casper, WY (United States)

    2014-05-15

    The authors investigated the licensing status of new in-situ recovery (“ISR”) uranium projects, as well as the expansion of existing projects, within the United States (“US”). Specific emphasis and analysis is placed on those projects within the states of Texas and Wyoming. Of note, information used to prepare this paper was obtained from public sources that included company web sites, the US Securities and Exchange Commission, the US Nuclear Regulatory Commission (“NRC”), the US Energy Information Agency (“EIA”), and the relevant state regulatory agencies. The renewed interest in the production of natural uranium has been motivated, in part, by the increased sale price of yellowcake beginning around 2003 resulting in numerous new and existing natural resources companies acquiring mineral rights in the United States. Because of the economic favorability in terms of both operating and capital costs of ISR mines versus conventional mines in the US (with its relatively low grade of uranium ore), the model for most companies was to acquire mineral properties that had the potential for being mined using the ISR method. There were, however, exceptions to this model. The Uravan mineral district in southwest Colorado and southeast Utah, where relatively high-grade, shallow uranium deposits have the potential to be mined using underground methods, is one such exception. However, the focus of this paper will be on ISR projects. In Wyoming, which has been the top producer of natural uranium among the 50 states for the past seven years, there is one producing ISR mine (Bill Smith — Highland), one ISR mine on standby (Christensen Ranch), and two ISR uranium projects licensed but not yet built (Gas Hills and North Butte). Cameco Resources is planning to develop two ISR projects in Wyoming that have been licensed but not yet constructed. Additionally, three new uranium companies (Ur-Energy, Uranerz and Uranium One) have filed applications with the federal and

  5. McIntosh Unit 4 PCFB demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Dodd, A.M. [Lakeland Electric and Water, FL (United States); Dryden, R.J. [Foster Wheeler Development Corp., San Diego, CA (United States); Morehead, H.T. [Westinghouse Electric Corp., Orlando, FL (United States)

    1997-12-31

    The City of Lakeland, Foster Wheeler Corporation and Westinghouse Electric Corporation have embarked on a utility scale demonstration of Pressurized Circulating Fluidized Bed (PCFB) technology at Lakeland`s McIntosh Power Station in Lakeland, Florida. The US Department of Energy will be providing approximately $195 million of funding for the project through two Cooperative Agreements under the auspices of the Clean Coal Technology Program. The project will involve the commercial demonstration of Foster Wheeler Pyroflow PCFB technology integrated with Westinghouse`s Hot Gas Filter (HGF) and power generation technologies. The total project duration will be approximately eight years and will be structured into three separate phases; two years of design and permitting, followed by an initial period of two years of fabrication and construction and concluding with a four year demonstration (commercial operation) period. It is expected that the project will show that Foster Wheeler`s Pyroflow PCFB technology coupled with Westinghouse`s HGF and power generation technologies represents a cost effective, high efficiency, low emissions means of adding greenfield generation capacity and that this same technology is also well suited for repowering applications.

  6. Small power reactor projects in the United States of America and Canada. Information gathered as a result of invitations from Member States

    International Nuclear Information System (INIS)

    1962-01-01

    As part of its activities in connection with the development of nuclear power, and in response to the resolutions adopted by the General Conference, the Agency has been undertaking a continuing study of the technology and economics of small and medium sized power reactors, particularly with reference to the needs of the less-developed countries. This report summarizes the information gathered on the small power reactor projects in the United States of America and Canada, as a result of the opportunity afforded by these Member States to the Agency. It may be recalled that, at the third regular session of the General Conference, the United States Government offered to provide the Agency with relevant technical and economic data on several small power reactor projects of its Atomic Energy Commission. The Agency accepted the offer and since June 1960 it has sent one or two staff members at approximately six-monthly intervals to follow the development of nine power reactor projects in the United States which represent six different reactor systems. Last year, the Agency issued a report summarizing the information obtained through their visits and study of available published literature. The present document, which should be read in conjunction with that document, brings the information up to date and provides additional information on certain phases of the projects already discussed in the last report. Three more power reactor projects are also dealt with, namely the experimental gas-cooled reactor (EGCR), the high temperature gas-cooled reactor (HTGR) and the Hallam nuclear power facility (HNPF). Early in 1962, the Canadian Government expressed its willingness to make available to the Agency relevant information on the NPD and CANDU projects. The coverage of the NPD reactor is based upon the published information supplied by AECL of Canada and the visit by one of the staff members to the NPD site. The Agency wishes to acknowledge with thanks the co-operation extended

  7. Overview of uranium mill tailings remedial action project of the United States of America 1995-1996

    International Nuclear Information System (INIS)

    Edge, R.

    1997-01-01

    From the early 1940's through the 1960's the United States federal government contracted for processed uranium ore for national defense research, weapons development and commercial nuclear energy. When these contracts were terminated, the mills ceased operation leaving large uranium tailings on the former mill sites. The purpose of the Uranium Remedial Action Project (UMTRA) is to minimize or eliminate potential health hazards resulting from exposure of the public to the tailings at these abandons sites. There are 24 inactive uranium mill tailings sites, in 10 states and an Indian reservation lands, included for clean up under the auspices of UMTRA. Presently the last 2 sites are under remediation. This paper addresses the progress of the project over the last two years. (author)

  8. FME Senior Project Managers: A Juggling Act of Multiple Projects | Poster

    Science.gov (United States)

    By Peggy Pearl, Contributing Writer It was not until the 1950s that organizations in the United States began to apply project management tools and techniques to complex construction and engineering projects (http://en.m.wikipedia.org/wiki/Project_life_cycle).

  9. 76 FR 70480 - Otay River Estuary Restoration Project, South San Diego Bay Unit of the San Diego Bay National...

    Science.gov (United States)

    2011-11-14

    ... River Estuary Restoration Project, South San Diego Bay Unit of the San Diego Bay National Wildlife...), intend to prepare an environmental impact statement (EIS) for the proposed Otay River Estuary Restoration... any one of the following methods. Email: [email protected] . Please include ``Otay Estuary NOI'' in the...

  10. Overview of a Project to Quantify Seismic Performance Factors for Cross Laminated Timber Structures in the United States

    Science.gov (United States)

    M. Omar Amini; John W. van de Lindt; Shiling Pei; Douglas Rammer; Phil Line; Marjan Popovski

    2014-01-01

    Cross-laminated Timber (CLT) has been extensively used in Europe and is now gaining momentum in North America; both Canada and more recently the U.S. Construction projects have shown that CLT can effectively be used as an alternative construction material in mid-rise structures and has significant potential in commercial and industrial buildings. In the United States,...

  11. Site productivity and forest carbon stocks in the United States: Analysis and implications for forest offset project planning

    Science.gov (United States)

    Coeli M. Hoover; James E. Smith

    2012-01-01

    The documented role of United States forests in sequestering carbon, the relatively low cost of forest-based mitigation, and the many co-benefits of increasing forest carbon stocks all contribute to the ongoing trend in the establishment of forest-based carbon offset projects. We present a broad analysis of forest inventory data using site quality indicators to provide...

  12. Judicial Process, Grade Eight. Resource Unit (Unit V).

    Science.gov (United States)

    Minnesota Univ., Minneapolis. Project Social Studies Curriculum Center.

    This resource unit, developed by the University of Minnesota's Project Social Studies, introduces eighth graders to the judicial process. The unit was designed with two major purposes in mind. First, it helps pupils understand judicial decision-making, and second, it provides for the study of the rights guaranteed by the federal Constitution. Both…

  13. Projected use of grazed forages in the United States: 2000 to 2050: A technical document supporting the 2000 USDA Forest Service RPA Assessment

    Science.gov (United States)

    Larry W. van Tassell; E. Tom Bartlett; John E. Mitchell

    2001-01-01

    Scenario analysis techniques were used to combine projections from 35 grazed forage experts to estimate future forage demand scenarios and examine factors that are anticipated to impact the use of grazed forages in the South, North, and West Regions of the United States. The amount of land available for forage production is projected to decrease in all regions while...

  14. NASA Ames DEVELOP Interns: Helping the Western United States Manage Natural Resources One Project at a Time

    Science.gov (United States)

    Justice, Erin; Newcomer, Michelle

    2010-01-01

    The western half of the United States is made up of a number of diverse ecosystems ranging from arid desert to coastal wetlands and rugged forests. Every summer for the past 7 years students ranging from high school to graduate level gather at NASA Ames Research Center (ARC) as part of the DEVELOP Internship Program. Under the guidance of Jay Skiles [Ames Research Center (ARC) - Ames DEVELOP Manager] and Cindy Schmidt [ARC/San Jose State University Ames DEVELOP Coordinator] they work as a team on projects exploring topics including: invasive species, carbon flux, wetland restoration, air quality monitoring, storm visualizations, and forest fires. The study areas for these projects have been in Washington, Utah, Oregon, Nevada, Hawaii, Alaska and California. Interns combine data from NASA and partner satellites with models and in situ measurements to complete prototype projects demonstrating how NASA data and resources can help communities tackle their Earth Science related problems.

  15. Use of mock-up training to reduce personnel exposure at the North Anna Unit 1 Steam Generator Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    Henry, H.G. [Virginia Power, Mineral, VA (United States); Reilly, B.P. [Bechtel Power Corp., Gaithersburg, MD (United States)

    1995-03-01

    The North Anna Power Station is located on the southern shore of Lake Anna in Louisa County, approximately forty miles northwest of Richmond, Virginia. The two 910 Mw nuclear units located on this site are owned by Virginia Electric and Power Company (Virginia Power) and Old Dominion Electric Cooperative and operated by Virginia Power. Fuel was loaded into Unit 1 in December 1977, and it began commercial operation in June 1978. Fuel was loaded into Unit 2 in April 1980 and began commercial operation in December 1980. Each nuclear unit includes a three-coolant-loop pressurized light water reactor nuclear steam supply system that was furnished by Westinghouse Electric Corporation. Included within each system were three Westinghouse Model 51 steam generators with alloy 600, mill-annealed tubing material. Over the years of operation of Unit 1, various corrosion-related phenomena had occurred that affected the steam generators tubing and degraded their ability to fulfill their heat transfer function. Advanced inspection and repair techniques helped extend the useful life of the steam generators, but projections based on the results of the inspections indicated that the existing steam generators tubing and degraded their ability to fullfill their heat transfer function. Advanced inspection and repair techniques helped extend the useful life of the steam generators, but projections based on the results of the inspections indicated that the existing steam generators would not last their design life and must be repaired. To this end Virginia Power determined that a steam generator replacement (SGR) program was necessary to remove the old steam generator tube bundles and lower shell sections, including the channel heads (collectively called the lower assemblies), and replace them with new lower assemblies incorporating design features that will prevent the degradation problems that the old steam generators had experienced.

  16. Economic viability of Cernavoda project

    International Nuclear Information System (INIS)

    Condu, M.; Popescu, D.; Chirica, T.; Glodeanu, F.

    1998-01-01

    Cernavoda project started in 1978, when the CANDU technology procurement contract and other contracts for engineering, technical assistance and procurement were signed with AECL. The works on site started in 1980. In February 1981, a contract was signed with GE - USA and Ansaldo - Italy for balance of plant. After 1989 the concept for project implementation was essentially changed. The completion of Cernavoda NPP Unit-1, established as the first priority by Romanian authorities was implemented by AECL-Ansaldo Consortium (AAC). The objective of the contract signed with AAC consisted in overtaking the management of Cernavoda Unit-1 project, in order to complete, commission and operate the plant for 18 months. The plant was successfully completed, commissioned and commercially operated since December 2, 1996. As concerns Unit-2, only preservation and some remedial works were performed since 1991. In order to support the decision to complete Unit-2, a complete process was initiated: - identification of the activities and associated costs required for plan completion; - plant integration in the utility's least cost development study; - Unit-2 cash flow analysis. A joint RENEL-AECL-ANSALDO team performed a detailed analysis using Cernavoda Unit-1 as reference project and taking advantage of the experience gained during construction, commissioning and operation of the first unit. The least cost power generation development study finalized by SEP and EDF, based on a PHARE funding, ranked Cernavoda Unit-2 on the second place, after two small hydroelectric plants of 53 and 8 Mw e. A cash flow model developed by a RENEL-ANSALDO joint team shows that Cernavoda Unit-2 is an economically feasible project. The financing scenario provides that all resources will be from loans. Other arguments for completion of Cernavoda Unit-2 are: - good performances in operation of Unit-1; - the need to provide jobs for the specialists in the nuclear field; - opportunity for electricity export

  17. Baltic NPP Project specifics and current status

    International Nuclear Information System (INIS)

    2011-01-01

    Project overview: 2 x 1194 MW Units (AES-2006 series); Location in Kaliningrad region of the; Russian Federation; Operation dates: Unit 1 – Oct 2016; Unit 2 – Apr 2018; Site preparatory works ongoing. This is first NPP project in the Russian Federation providing opportunity for participation of foreign investors. Foreign investors may acquire up to 49% share. Cross-border transmission lines developed under separate project with participation of foreign investors. Conclusion: At the selected set of assumptions, the project is financially feasible in all scenarios

  18. Project management. A discipline which contributes to project success

    International Nuclear Information System (INIS)

    Hoch, G.

    2008-01-01

    The presentation covers the following topics: description of the Project - a contract was signed between KNPP and European Consortium Kozloduy (ECK) consisting of Framatome ANP GmbH as Leader (63%), Framatome ANP S.A.S. (17%), Atomenergoexport (20%) ; Project management in the modernization of NPP Kozloduy units 5 and 6; Project management process within AREVA NP GmbH; current status

  19. Imagine There's No Carnegie Unit

    Science.gov (United States)

    Klevgaard, Janine

    2013-01-01

    This article describes how the Alberta Education High School Flexibility Enhancement Pilot Project allowed 16 high schools in Alberta, Canada, to remove the restrictions of the Carnegie unit, the seat time per credit requirement that has been widely used since 1906. The two purposes of the project were to determine whether the Carnegie unit should…

  20. Harvard Project Physics Newsletter 10. The Project Physics Course, Text.

    Science.gov (United States)

    Harvard Univ., Cambridge, MA. Harvard Project Physics.

    A short description of the availability of Harvard Project Physics course components is given as is a discussion of the growth of the use of Project Physics in schools, including some enrollment data and survey results. Locations of the 1970 and 1971 Summer Institutes are listed. Adaptations of Project Physics course outside the United States are…

  1. Final environmental statement related to the operation of South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499)

    International Nuclear Information System (INIS)

    1986-08-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with the operation of the South Texas Project, Units 1 and 2, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environmental impacts, environmental consequences and mitigating actions, and environmental and economic benefits and costs associated with station operation. Land use and terrestrial and aquatic ecological impacts will be small. No operational impacts to historic and archeological sites are anticipated. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. Socioeconomic impacts of the project are anticipated to be minimal. The action called for is the issuance of an operating license for South Texas Project, Units 1 and 2

  2. Economics of biofiltration for remediation projects

    International Nuclear Information System (INIS)

    Yudelson, J.M.; Tinari, P.D.

    1995-01-01

    Biofilters with granular activated carbon (GAC) filter backup units offer substantial savings compared to conventional GAC filters and catalytic/thermal oxidation (Catox) units in controlling emissions of volatile organic compounds (VOCs) from petroleum remediation projects. Provided that the biofilter supplier is willing to satisfy the client's and consultant's risk-management concerns, biofilters offer anew method for reducing the cost of remediation projects, with savings of up to $10,000 (24%) per facility in 24-month projects and up to $16,000 (32%) per facility in 36-month projects for simple gas station remediation projects. Savings will be greater for longer projects and projects with higher average contaminant loadings

  3. The Barselina Project Phase 4 Summary report. Ignalina Unit 2 Probabilistic Safety Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Johansson, Gunnar [ES-Konsult AB, Stockholm (Sweden); Hellstroem, P. [RELCON AB, Solna (Sweden); Zheltobriuch, G.; Bagdonas, A. [Ignalina Power Plant, Visaginas (Lithuania)

    1996-12-01

    The Barselina Project was initiated in the summer of 1991. The project is a multilateral co-operation between Lithuania, Russia and Sweden. The long range objective is to establish common perspectives and unified bases for assessment of severe accident risks and needs for remedial measures for the RBMK reactors. The Swedish BWR Barsebaeck is used as reference plant and the Lithuanian RBMK Ignalina as application plant. During phase 3, from March, 1993 to June, 1994, a full scope Probabilistic Safety Analysis (PSA) model of the Ignalina Nuclear Power Plant unit 2 (INPP-2) was developed to identify possible safety improvement of risk importance. The probabilistic methodology was applied on a plant specific basis for a channel type reactor of RBMK design. To increase the realism of the risk model a set of deterministic analyses were performed and plant/RBMK-specific data bases were developed and used. A general concept for analysing this type of reactor was developed. During phase 4, July 1994 to September 1996, the PSA was further developed, taking into account plant changes, improved modeling methods and extended plant information concerning dependencies (area events, dynamic effects, electrical and signal dependencies). The updated model is quantified and new results and conclusions are evaluated.

  4. Brayton Point coal conversion project (NEPCO)

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, W.F. Jr.

    1982-05-01

    The New England Power Company (NEPCO) recently converted Brayton Point Power Station Units 1, 2, and 3 from oil to coal. The coal conversion project is the largest coal conversion project in the nation to date. Stone and Webster Engineering Corporation (SWEC) was hired as the engineer/constructor for the project. Units 1 and 2 are 250-MW Combustion Engineering boilers, and Unit 3 is a 650-MW Babcock and Wilcox boiler. All three units were originally designed to burn pulverized coal but were converted to oil during the years of low oil prices. Studies performed by NEPCO and SWEC indicated that the areas discussed in the following paragraphs required upgrading before the units could efficiently burn coal and meet Federal and State environmental requirements. All units have been converted and are operating. This paper discusses design modifications required to burn coal, startup, and initial operating problems, and solutions.

  5. TECHNOLOGICAL INNOVATION IN PROJECTS OF NEW PRODUCT DEVELOPMENT: AN EXPLORATORY STUDY ON RELATIONSHIP MANAGEMENT INTEGRATION AMONG UNITS OF A MULTINATIONAL COMPANY

    Directory of Open Access Journals (Sweden)

    Daniel Jugend

    2012-04-01

    Full Text Available Although the topic of integration in product development is widely debated in the literature, there are few studies that address the participation by subsidiaries of multinational and R & D centers around the world in development projects of new products. Focusing on the perception of the Brazilian unit, this paper aims to present and analyze integration practices among subsidiaries, headquarters and R&D centers in product development projects in a multinational high tech company. For this purpose, was conducted an exploratory and qualitative researched operationalized by case study. Among the main results, it was noted collaboration between locals marketing and engineering with the R & D centers, important role of senior management in the Brazilian unit to communicate outcomes of the strategic planning of products and technologies established by the headquarters to the subsidiary, the adoption of technological and information mechanisms and the application of methods such as technology roadmap.

  6. Final environmental statement related to construction of Skagit Nuclear Power Project Units 1 and 2: (Docket Nos. 50-522 and 50-523)

    International Nuclear Information System (INIS)

    1975-05-01

    The proposed action is the issuance of construction permits to the Pudget Sound Power and Light Company, Pacific Power and Light Company, Washington Water Power Company and the Washington Public Power Supply System, for the construction of Skagit Nuclear Power Projects Units 1 and 2 (Docket Nos. 50-522 and 50-523) in Skagit County, Washington (about 64 miles north of Seattle and 6 miles ENE of Sedro Woolley). These units are scheduled for commercial service in 1982 and 1985, respectively. Each unit will employ a boiling-water nuclear reactor with a maximum expected thermal power level of 4100 MWt, which is considered in the assessments contained in this statement. At the 3800 MWt power level initially to be licensed, the net electrical capacity of each unit will be 1288 MWe. The exhaust steam from the turbine-generators will be cooled in condensers which will utilize one hyperbolic-type natural-draft cooling tower per unit to dissipate heat to the atmosphere. Water (106 cfs max.) for the cooling tower makeup (82.4 cfs) and other plant uses will be withdrawn from the Skagit River through Ranney Collectors embedded in the north bank of the river and pumped to the plant through a pipeline about 35,000 ft. long. Cooling tower blowdown (7 cfs max.) from the project and dilution water (20 cfs max.) will flow through a pipeline back to the river where it will be discharged through a diffuser

  7. Status and understanding of groundwater quality in the Northern Coast Ranges study unit, 2009: California GAMA Priority Basin Project

    Science.gov (United States)

    Mathany, Timothy M.; Belitz, Kenneth

    2015-01-01

    Groundwater quality in the 633-square-mile (1,639-square-kilometer) Northern Coast Ranges (NOCO) study unit was investigated as part of the Priority Basin Project (PBP) of the Groundwater Ambient Monitoring and Assessment (GAMA) Program and the U.S. Geological Survey (USGS) National Water-Quality Assessment Program. The study unit is composed of two study areas (Interior Basins and Coastal Basins) and is located in northern California in Napa, Sonoma, Lake, Colusa, Mendocino, Glenn, Humboldt, and Del Norte Counties. The GAMA-PBP is being conducted by the California State Water Resources Control Board in collaboration with the USGS and the Lawrence Livermore National Laboratory.

  8. The Executive Process, Grade Eight. Resource Unit (Unit III).

    Science.gov (United States)

    Minnesota Univ., Minneapolis. Project Social Studies Curriculum Center.

    This resource unit, developed by the University of Minnesota's Project Social Studies, introduces eighth graders to the executive process. The unit uses case studies of presidential decision making such as the decision to drop the atomic bomb on Hiroshima, the Cuba Bay of Pigs and quarantine decisions, and the Little Rock decision. A case study of…

  9. High-Resolution Dynamical Downscaling Ensemble Projections of Future Extreme Temperature Distributions for the United States

    Science.gov (United States)

    Zobel, Zachary; Wang, Jiali; Wuebbles, Donald J.; Kotamarthi, V. Rao

    2017-12-01

    The aim of this study is to examine projections of extreme temperatures over the continental United States (CONUS) for the 21st century using an ensemble of high spatial resolution dynamically downscaled model simulations with different boundary conditions. The downscaling uses the Weather Research and Forecast model at a spatial resolution of 12 km along with outputs from three different Coupled Model Intercomparison Project Phase 5 global climate models that provide boundary conditions under two different future greenhouse gas (GHG) concentration trajectories. The results from two decadal-length time slices (2045-2054 and 2085-2094) are compared with a historical decade (1995-2004). Probability density functions of daily maximum/minimum temperatures are analyzed over seven climatologically cohesive regions of the CONUS. The impacts of different boundary conditions as well as future GHG concentrations on extreme events such as heat waves and days with temperature higher than 95°F are also investigated. The results show that the intensity of extreme warm temperature in future summer is significantly increased, while the frequency of extreme cold temperature in future winter decreases. The distribution of summer daily maximum temperature experiences a significant warm-side shift and increased variability, while the distribution of winter daily minimum temperature is projected to have a less significant warm-side shift with decreased variability. Using "business-as-usual" scenario, 5-day heat waves are projected to occur at least 5-10 times per year in most CONUS and ≥95°F days will increase by 1-2 months by the end of the century.

  10. Sustainable Urban Development? Exploring the Locational Attributes of LEED-ND Projects in the United States through a GIS Analysis of Light Intensity and Land Use

    Directory of Open Access Journals (Sweden)

    Russell M. Smith

    2016-06-01

    Full Text Available LEED®-ND™ is the latest attempt to develop more sustainable urban environs in the United States. The LEED®-ND™ program was created to provide a green rating system that would improve the quality of life for all people through the inclusion of sustainable development practices. To achieve this, a premium is placed on the locational attributes of proposed projects under the “Smart Location and Linkages” credit category. The purpose of this paper is to explore the locational attributes of LEED®-ND™ projects in the United States to determine if projects are being located in areas that will result in achieving the program’s stated objectives. Specifically, this paper will examine two locational variables (i.e., night-time light intensity and land use cover through the use of GIS to determine the effectiveness of these criteria.

  11. Structuring a mega-project

    Energy Technology Data Exchange (ETDEWEB)

    Kutryk, T. [Husky Oil Operations Ltd., Calgary, AB (Canada)

    2004-07-01

    This paper presented an overview of mega-project management. Issues concerning scope, cost and schedule were discussed, with reference to the idea that a choice must be made from the outset as to which of the 3 is a main priority. The importance of preparation and the development of a fully resourced plan was emphasized. The use of the parametric 4-D model was discussed. Lessons that the construction industry may learn from manufacturers were presented along with issues of contract development and the role and importance of the project manager. Issues concerning performance measurement were reviewed, including lagging indicators. Project division factors were also discussed, with reference to data lags, naturally concurrent processes and over the fence units. A case study of Walmart was presented. Project design packages and long lead time items were discussed, as were issues concerning human resources. Functional units were examined in relation to zones of influence and unit integration. Various combinations of zones of influence were presented. Issues concerning span of control and varying relationships within a project were discussed. It was emphasized that great deeds can be accomplished by attracting the best people. tabs., figs.

  12. United States Crystalline Repository Project - key research areas

    International Nuclear Information System (INIS)

    Patera, E.S.

    1986-01-01

    The Crystalline Repository Project is responsible for siting the second high-level nuclear waste repository in crystalline rock for the US Department of Energy. A methodology is being developed to define data and information needs and a way to evaluate that information. The areas of research the Crystalline Repository Project is involved in include fluid flow in a fractured network, coupled thermal, chemical and flow processes and cooperation in other nations and OECD research programs

  13. Project CHOICE: #67. A Career Unit for Grades 5 and 6. Introduction to Advertising. (Marketing and Distribution Occupations Career Cluster).

    Science.gov (United States)

    Kern County Superintendent of Schools, Bakersfield, CA.

    This teaching unit, Introduction to Advertising, is one in a series of curriculum guides developed by Project CHOICE (Children Have Options in Career Education) to provide the classroom teacher with a source of career-related activities linking 5th and 6th grade elementary classroom experiences with the world of work. These ten lessons on…

  14. Uncertainties in Transport Project Evaluation: Editorial

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Nielsen, Otto Anker

    2015-01-01

    University of Denmark, September 2013. The conference was held under the auspices of the project ‘Uncertainties in transport project evaluation’ (UNITE) which is a research project (2009-2014) financed by the Danish Strategic Research Agency. UNITE was coordinated by the Department of Transport......This following special issue of the European Journal of Transport Infrastructure Research (EJTIR) containing five scientific papers is the result of an open call for papers at the 1st International Conference on Uncertainties in Transport Project Evaluation that took place at the Technical...

  15. On evolutionary ray-projection dynamics

    NARCIS (Netherlands)

    Joosten, Reinoud A.M.G.; Roorda, Berend

    2011-01-01

    We introduce the ray-projection dynamics in evolutionary game theory by employing a ray projection of the relative fitness (vector) function, i.e., a projection unto the unit simplex along a ray through the origin. Ray-projection dynamics are weakly compatible in the terminology of Friedman

  16. Financing of Chamera project

    International Nuclear Information System (INIS)

    Jain, A.K.; Chakraborty, D.K.

    1994-01-01

    Chamera Hydroelectric Project was selected by National Hydroelectric Power Corporation (NHPC) as a pilot project for accelerated development of hydro-power in the country. This project was considered to have certain distinct specialties from different aspects in comparison with other projects. In the first place, the field investigation for the project was completed in a record time of only eight months by deploying the most modern techniques. Secondly, Chamera was the first NHPC project with external aid both technically and financially. The third and most important of all the specialties was in the planned reduction of construction period to 6 years from the original estimate of 8 years. Such reduction of gestation period was considered to be the direct outcome of modern method of management, monitoring and improved imported technology. The investment decision in the project was taken in April '84 with an estimated cost of energy at busbar 44.12 paise/unit exclusive of return on equity capital and royalty payable to the home state. The all inclusive rate of power was estimated 75.86 paise/unit. (author). 4 tabs

  17. Technical Specifications, South Texas Project, Unit No. 1 (Docket No. 50-498): Appendix ''A'' to License No. NPF-76

    International Nuclear Information System (INIS)

    1988-03-01

    The South Texas Project, Unit No. 1, Technical Specifications were prepared by the US Nuclear Regulatory Commission to set forth the limits, operating conditions, and other requirements applicable to a nuclear reactor facility as set forth in Section 50.36 of 10 CFR 50 for the protection of the health and safety of the public. This report is Appendix A to License No. NPF-76

  18. Summary and abstracts: Applied Research Units and Projects 1996 UCETF Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-21

    The Urban Consortium (UC), created by PTI, is a network of jurisdictions with populations of over 250,000. The UC provides a platform for research and enterprise through its Energy, Environmental, Transportation, and Telecommunications and Information Task Forces. The UC provides a unique creative forum where elected and appointed officials and technical managers identify, test, and validate practical ways to improve the provision of public services and, where possible, generate new revenue opportunities. Public Technology, Inc., is the non-profit technology organization of the National League of Cities, the National Association of Counties, and the International City/County Management Association. PTI creates and advances technology-based products, services, and enterprises in cities and counties nationwide. Staffed by PTI, the UC addresses the critical needs of local governments through its Task Forces. The Urban Consortium Energy Task Force (UCETF) program has, since its inception, acted as a laboratory to develop, test solutions and share the resulting products or management approaches with the wider audience of local governments. It has addressed the overlap between energy and environment and economic development policy issues, and, is the nation's most extensive cooperative local government program to improve energy management and decision-making through applied research and technology cooperation. Proposals to meet the specific objectives of the UCETF annual R and D program are solicited from major urban jurisdictions. Projects based on these proposals are then selected by the UCETF for direct conduct and management by staff of city and county governments. Projects selected for each year's program are organized in thematic units to assure effective management and ongoing peer-to-peer experience exchange, with results documented at the end of each program year.

  19. Safety evaluation report related to the operation of South Texas Project, Unit 2 (Docket No. 50-499)

    International Nuclear Information System (INIS)

    1989-03-01

    In April 1986 the staff of the US Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0781) regarding the application of Houston Lighting and Power Company (applicant and agent for the owners) for a license to operate South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499). The facility is located in Matagorda County, Texas, west of the Colorado River, 8 miles north-northwest of the town of Matagorda and about 89 miles southwest of Houston. The first supplement to NUREG-0781 was issued in September 1986, the second supplement in January 1987, the third supplement in May 1987, the fourth supplement in July 1987, the fifth supplement in March 1988, and the sixth supplement in January 1989. This seventh supplement, which supports the issuance of a full-power license for Unit 2, provides updated information on the issues that had been considered previously as well as the evaluation of issues that have arisen since the sixth supplement was issued. The evaluation resolves all the issues necessary to support the issuance of a full-power license for Unit 2. 2 refs., 2 figs., 1 tab

  20. The Global Educational Toxicology Uniting Project (GETUP): an Analysis of the First Year of a Novel Toxicology Education Project.

    Science.gov (United States)

    Wong, Anselm; Vohra, Rais; Ruha, Anne-Michelle; Koutsogiannis, Zeff; Graeme, Kimberlie; Dargan, Paul I; Wood, David M; Greene, Shaun L

    2015-09-01

    The international boundaries to medical education are becoming less marked as new technologies such as multiuser videoconferencing are developed and become more accessible to help bridge the communication gaps. The Global Educational Toxicology Uniting Project (GETUP) is aimed at connecting clinicians in countries with established clinical toxicology services to clinicians in countries without clinical toxicologists around the globe. Centers that manage or consult on toxicology cases were registered through the American College of Medical Toxicology website via Survey Monkey®. Data was analyzed retrospectively from February 2014 to January 2015. Google hangouts® was used as the main conferencing software, but some sites preferred the use of Skype®. Registration data included contact details and toxicology background and qualifications. Thirty sites in 19 different countries in Australasia, Europe, Africa, and America were registered. Twenty-eight (93 %) sites were located in a major urban center, one (3.5 %) site in a major rural center and one (3.5 %) a private practice. Expectations of GETUP included sharing toxicology cases and education (30, 100 % of sites), assistance with toxicology management guidelines (2, 7 %), assistance with providing a toxicology teaching curriculum in languages other than English (2, 7 %), and managing toxicology presentations in resource-poor settings, international collaboration, and toxicovigilance (2 sites, 7 %). Twenty-two conferences were performed during the first 12 months with a mean of 3 cases per conference. GETUP has connected countries and clinical units with and without toxicology services and will provide a platform to improve international collaboration in clinical toxicology.

  1. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    Science.gov (United States)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  2. EPR project construction cost control

    International Nuclear Information System (INIS)

    Duflo, D.; Pouget-Abadie, X.; Dufour, A.; Kauffmann, G.

    2001-01-01

    The EPR project is now managed by EDF in cooperation with the German Utilities. The main engineering activities for this period are related to the preparation of construction project management, deepening of some safety issues, definition of the project technical reference. The EPR project concerns the so-called reference unit, that is an isolated first-off unit, with unit electrical power of about 1500 MW. The construction costs evaluated are those of the nuclear island, the conventional island, site facilities, installation work and the administrative buildings. The EPR project construction cost evaluation method applies to all the equipment installed and commissioned. It requires the availability of a preliminary project detailed enough to identify the bill of quantities. To these quantities are then assigned updated unit prices that are based either on cost bases for similar and recent facilities or taken from request for quotation for similar equipment or result from gains due to contractual conditions benefiting from simplifications in the functional and technical specifications. The input and output data are managed in a model that respects the breakdown on which the evaluation method is based. The structural organization of this method reflects a functional breakdown on the one hand (nuclear island, conventional island, common site elements) and on the other hand a breakdown according to equipment or activity (civil engineering, mechanics, electricity, instrumentation and control). This paper discusses the principle and the method of construction cost evaluation carried out, the cost data base and input and output parameters as well as results and oncoming cost analysis tasks. (author)

  3. Expanding the usefulness of unit supply cost

    International Nuclear Information System (INIS)

    McKenzie, M.B.; Petr, K.

    1992-01-01

    Unit supply cost is a widely used tool in the energy business for providing a one number-unit cost description. For example, controllable costs such as finding costs, development costs and operating costs have traditionally been described in an average cost per unit of reserves format for the oil and gas industry, however using this approach on more specific applications is not always informative. Projects with widely varying controllable parameters can still yield the same unit cost, making comparisons difficult. The application of unit supply cost can be readily expanded by adding a new unit cost component termed cost of capital. This element introduces the impacts of timing and return on investment into the supply cost determination through discounting annual costs. The cost of capital component adds the ability to represent a project's unique characteristics, particularly reserves' depletion rate and the timing or phasing of development. Introducing the cost of capital element into the supply cost analysis provides additional information and improves the likelihood of drawing correct conclusions when comparing and ranking projects. 4 figs., 6 tabs

  4. Teaching the Manhattan Project

    Science.gov (United States)

    Schibuk, Elizabeth

    2015-01-01

    This article describes a nuclear chemistry unit on the Manhattan Project, a research effort that led to the development of the world's first nuclear weapons during World War II. The unit is appropriate for an introductory high school chemistry or physics course and takes from four to six weeks. The unit poses this essential question: "Over…

  5. Better Buildings Alliance, Advanced Rooftop Unit Campaign: Rooftop Unit Measurement and Verification (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    2014-09-01

    This document provides facility managers and building owners an introduction to measurement and verification (M&V) methods to estimate energy and cost savings of rooftop units replacement or retrofit projects to estimate paybacks or to justify future projects.

  6. Statistics for Research

    CERN Document Server

    Dowdy, Shirley; Chilko, Daniel

    2011-01-01

    Praise for the Second Edition "Statistics for Research has other fine qualities besides superior organization. The examples and the statistical methods are laid out with unusual clarity by the simple device of using special formats for each. The book was written with great care and is extremely user-friendly."-The UMAP Journal Although the goals and procedures of statistical research have changed little since the Second Edition of Statistics for Research was published, the almost universal availability of personal computers and statistical computing application packages have made it possible f

  7. Racial Conflict in the United States: What Should Be Done? Grade Twelve. [Resource Unit V.] Project Social Studies.

    Science.gov (United States)

    Minnesota Univ., Minneapolis. Project Social Studies Curriculum Center.

    This is the fifth of seven resource units for a twelfth grade course on value conflicts and policy decisions. The topic for this unit is racial conflict in the United States. The introduction explains how this unit coincides with other units of the K-12 series which have treated intergroup relations. The objectives are listed as to…

  8. The Environmental Management Project Manager's Handbook for improved project definition

    International Nuclear Information System (INIS)

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook

  9. Safety Evaluation Report related to the operation of South Texas Project, Unit 2 (Docket No. 50-499)

    International Nuclear Information System (INIS)

    1989-01-01

    In April 1986 the staff of the US Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0781) regarding the application of Houston Lighting and Power Company (applicant and agent for the owners) for a license to operate South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499). The facility is located in Matagorda County, Texas, west of the Colorado River, 8 miles north-northwest of the town of Matagorda and about 89 miles southwest of Houston. The first supplement to NUREG-0781 was issued in September 1986, the second supplement in January 1987, the third supplement in May 1987, the fourth supplement in July 1987 and the fifth supplement in March 1988. This sixth supplement provides updated information on the issues that had been considered previously as well as the evaluation of issues that have arisen since the fifth supplement was issued. The evaluation resolves all the issues necessary to support the issuance of a low-power license for Unit 2

  10. 2014 Well Completion Report for Corrective Action Unit 447 Project Shoal Area Churchill County, Nevada October 2015

    Energy Technology Data Exchange (ETDEWEB)

    Findlay, Rick [US Department of Energy, Washington, DC (United States).Office of Legacy Management

    2015-11-01

    This report summarizes the drilling program conducted by the U.S. Department of Energy (DOE) Office of Legacy Management at the Project Shoal Area (Shoal) Subsurface Corrective Action Unit 447 in Churchill County, Nevada. Shoal was the location of an underground nuclear test conducted on October 26, 1963, as part of the Vela Uniform program sponsored jointly by the U.S. Department of Defense and the U.S. Atomic Energy Commission (a predecessor to DOE). The test consisted of detonating a 12-kiloton nuclear device in granitic rock at a depth of approximately 1,211 feet (ft) below ground surface (bgs) (AEC 1964). The corrective action strategy for the site is focused on revising the site conceptual model and evaluating the adequacy of the monitoring well network at the site. Field activities associated with the project were conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended) and applicable Nevada Division of Environmental Protection (NDEP) policies and regulations.

  11. 24 CFR 266.200 - Eligible projects.

    Science.gov (United States)

    2010-04-01

    ... being collected at unassisted projects in the market area that are similar in amenities and location to... assistance agreement or the unit rents being collected at unassisted projects in the market that are similar... in § 266.5. (g) Elderly projects. Projects or parts of projects specifically designed for the use and...

  12. Wood products used in constructing conservation and development projects by the Corps of Engineers in the United States, 1962 and 1978

    Science.gov (United States)

    W. H. Reid; D. B. McKeever

    Estimates of the amounts of wood products used in constructing civil conservation and development projects by the Corps of Engineers in the United States are presented for the years 1962 and 1978. Amounts of lumber, laminated lumber, poles and piling, and plywood used in construction are stratified by five construction categories, and three types of uses. Estimates of...

  13. All projects related to | Page 116 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Assessing the Impact of Cash Transfer Programs on Women's Empowerment in Tanzania. Project. This project will ... Program: Growth and Economic Opportunities for Women ... Region: South Asia, Pakistan, United Kingdom, United States.

  14. Projected impacts of federal tax policy proposals on mortality burden in the United States: A microsimulation analysis.

    Science.gov (United States)

    Kim, Daniel

    2018-06-01

    The public health consequences of federal income tax policies that influence income inequality are not well understood. I aimed to project the impacts on mortality of modifying federal income tax structures based on proposals by two recent United States (U.S.) Presidential candidates: Donald Trump and Senator Bernie Sanders. I performed a microsimulation analysis using the latest U.S. Internal Revenue Service public-use tax file with state identifiers (2008 tax year), containing nationally-representative data from 139,651 tax returns. I considered five tax plan scenarios: 1) actual 2008 tax structures; proposals in 2016 by then-candidates 2) Trump and 3) Sanders; 4) a modified Sanders plan with higher top tax rates (75%); and 5) a modified Sanders plan with higher top rates plus revenue redistribution to lower-income households (Trump and Sanders plans, respectively. Under the modified Sanders plan including higher top rates, 68,919 (95% CI: 25,221-113,561) fewer deaths/year are projected. Under the modified Sanders plan with redistribution, 333,504 (95% CI: 192,897-473,787) fewer deaths/year are expected. Policies that both raise federal income tax rates and redistribute tax revenue could confer large reductions in the total number of annual deaths among Americans. In this era of high income inequality and growing public support to address the rich-poor gap, policymakers should consider joint federal tax and redistributive policies as levers to reduce the burden of mortality in the United States. Copyright © 2017 The Author. Published by Elsevier Inc. All rights reserved.

  15. Utility-Scale Solar 2013: An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States

    OpenAIRE

    Bolinger, M; Weaver, S

    2014-01-01

    The utility-scale solar sector has led the overall U.S. solar market in terms of installed capacity since 2012. In 2016, the utility-scale sector installed more than 2.5 times as much new capacity as did the residential and commercial sectors combined, and is expected to maintain its dominant position for at least another five years. This report—the fifth edition in an ongoing annual series—provides data-driven analysis of the utility-scale solar project fleet in the United States. We analyze...

  16. Error Cost Escalation Through the Project Life Cycle

    Science.gov (United States)

    Stecklein, Jonette M.; Dabney, Jim; Dick, Brandon; Haskins, Bill; Lovell, Randy; Moroney, Gregory

    2004-01-01

    It is well known that the costs to fix errors increase as the project matures, but how fast do those costs build? A study was performed to determine the relative cost of fixing errors discovered during various phases of a project life cycle. This study used three approaches to determine the relative costs: the bottom-up cost method, the total cost breakdown method, and the top-down hypothetical project method. The approaches and results described in this paper presume development of a hardware/software system having project characteristics similar to those used in the development of a large, complex spacecraft, a military aircraft, or a small communications satellite. The results show the degree to which costs escalate, as errors are discovered and fixed at later and later phases in the project life cycle. If the cost of fixing a requirements error discovered during the requirements phase is defined to be 1 unit, the cost to fix that error if found during the design phase increases to 3 - 8 units; at the manufacturing/build phase, the cost to fix the error is 7 - 16 units; at the integration and test phase, the cost to fix the error becomes 21 - 78 units; and at the operations phase, the cost to fix the requirements error ranged from 29 units to more than 1500 units

  17. Internal and External Barriers Impacting Non-Food Cellulosic Biofuel Projects in the United States

    Directory of Open Access Journals (Sweden)

    Jeremy Withers

    2015-05-01

    Full Text Available Escalating demand, along with EPAct 2005, has led the United States government to assume a twofold leadership approach of energy security and environmental practices. This has initiated several important issues pertaining to cellulosic biofuel production. However, little is known about what is needed for the U.S. to lead long-term renewable energy security, how the US will develop and implement leading environmental energy practices, what supply capabilities and refining technologies are available to produce renewable fuels, and how funding can be used to adopt available technologies. This article examines geographical aspects, operational status, and barriers tending to prevent the successful commercialization of non-food cellulosic ethanol projects in the U.S. from secondary sources. Outcomes of this research can be used to further understand inhibitors that impact the production and commercialization of ethanol from non-food cellulosic sources.

  18. NEA international co-operative projects

    International Nuclear Information System (INIS)

    1989-01-01

    This text is consecrated at the international co-operative projects of the OECD Nuclear Energy Agency (NEA) in the field of reactor safety (Halden reactor project, Loft project, studies on the damaged Three Mile Island unit-2 reactor, inspection of reactor steel components, incident reporting system) and in the field of radioactive waste management (Stripa project, geochemical data bases, Alligator river project, seabed disposal of high-level radioactive waste, decommissioning of nuclear facilities)

  19. A Nurse Leadership Project to Improve Health Literacy on a Maternal-Infant Unit.

    Science.gov (United States)

    Stikes, Reetta; Arterberry, Katheryn; Logsdon, M Cynthia

    2015-01-01

    To describe how participation in the Sigma Theta Tau International Maternal-Child Health Nurse Leadership Academy positioned the authors to lead an interdisciplinary team through implementation and evaluation of a change project related to patient education based upon national health literacy standards. The project goal was to improve patient satisfaction with nurse communication and preparation for hospital discharge. Quality improvement. Mother/-baby unit of an academic medical center serving a high percentage of patients of a minority population and underserved clients. The five- step intervention included (a) review of current health literacy standards, (b) formation of an infrastructure for development and evaluation of existing patient education materials, (c) assessment of patient education materials currently in use, (d) assessment of literacy level and learning styles of new mothers, and (e) provision of continuing education to increase knowledge of nurses as patient teachers and of health literacy. Mean scores of Hospital Consumer Assessment of Healthcare Providers and Systems (HCAHPS) in the domains of patient satisfaction with nurse communication and discharge information were used to measure patient satisfaction with health communication. Patient satisfaction with nurse communication increased from 75.9% to 84.6%. Satisfaction with discharge information increased from 84.6% to 98.6%. The leadership academy successfully positioned the authors to guide an interdisciplinary team through development of a process to meet the education and communication needs of patients and improve their health literacy. As a result, a positive effect was noted on patient satisfaction with health communication. © 2015 AWHONN, the Association of Women's Health, Obstetric and Neonatal Nurses.

  20. The Nephrocare project

    DEFF Research Database (Denmark)

    Bergrem, Harald; Gøransson, Lasse; Asmundsson, Pall

    2009-01-01

    OBJECTIVE: Few studies have focused on patients actually attending renal units for their follow-up over time. This study reports the type of prevalent patients (case-mix) with a renal condition being followed up by 19 renal units in the Nordic countries during 1998-99. MATERIAL AND METHODS......: In a joint quality of care development project between the renal societies of the five Nordic countries and the unit for Quality of Health Systems, WHO (Europe), 19 renal units collected data on a random sample of their prevalent patients. RESULTS: At follow-up, 56% had chronic kidney disease (CKD...

  1. Soil nutrient budgets following projected corn stover harvest for biofuel production in the conterminous United States

    Science.gov (United States)

    Tan, Zhengxi; Liu, Shuguang

    2015-01-01

    Increasing demand for food and biofuel feedstocks may substantially affect soil nutrient budgets, especially in the United States where there is great potential for corn (Zea mays L) stover as a biofuel feedstock. This study was designed to evaluate impacts of projected stover harvest scenarios on budgets of soil nitrogen (N), phosphorus (P), and potassium (K) currently and in the future across the conterminous United States. The required and removed N, P, and K amounts under each scenario were estimated on the basis of both their average contents in grain and stover and from an empirical model. Our analyses indicate a small depletion of soil N (−4 ± 35 kg ha−1) and K (−6 ± 36 kg ha−1) and a moderate surplus of P (37 ± 21 kg ha−1) currently on the national average, but with a noticeable variation from state to state. After harvesting both grain and projected stover, the deficits of soil N, P, and K were estimated at 114–127, 26–27, and 36–53 kg ha−1 yr−1, respectively, in 2006–2010; 131–173, 29–32, and 41–96 kg ha−1 yr−1, respectively, in 2020; and 161–207, 35–39, and 51–111 kg ha−1 yr−1, respectively, in 2050. This study indicates that the harvestable stover amount derived from the minimum stover requirement for maintaining soil organic carbon level scenarios under current fertilization rates can be sustainable for soil nutrient supply and corn production at present, but the deficit of P and K at the national scale would become larger in the future.

  2. Examination of corticothalamic fiber projections in United States service members with mild traumatic brain injury

    Science.gov (United States)

    Rashid, Faisal M.; Dennis, Emily L.; Villalon-Reina, Julio E.; Jin, Yan; Lewis, Jeffrey D.; York, Gerald E.; Thompson, Paul M.; Tate, David F.

    2017-11-01

    Mild traumatic brain injury (mTBI) is characterized clinically by a closed head injury involving differential or rotational movement of the brain inside the skull. Over 3 million mTBIs occur annually in the United States alone. Many of the individuals who sustain an mTBI go on to recover fully, but around 20% experience persistent symptoms. These symptoms often last for many weeks to several months. The thalamus, a structure known to serve as a global networking or relay system for the rest of the brain, may play a critical role in neurorehabiliation and its integrity and connectivity after injury may also affect cognitive outcomes. To examine the thalamus, conventional tractography methods to map corticothalamic pathways with diffusion-weighted MRI (DWI) lead to sparse reconstructions that may contain false positive fibers that are anatomically inaccurate. Using a specialized method to zero in on corticothalamic pathways with greater robustness, we noninvasively examined corticothalamic fiber projections using DWI, in 68 service members. We found significantly lower fractional anisotropy (FA), a measure of white matter microstructural integrity, in pathways projecting to the left pre- and postcentral gyri - consistent with sensorimotor deficits often found post-mTBI. Mapping of neural circuitry in mTBI may help to further our understanding of mechanisms underlying recovery post-TBI.

  3. Firm R&D units and outsourcing partners: A matching story

    OpenAIRE

    Barge-Gil, Andrés; Conti, Annamaria

    2013-01-01

    We present a theory that examines the optimal match between firm R&D units and external partners for projects that involve problem solving. We have a firm selecting an external partner conditional on the learning costs of its internal R&D unit. We show that there exists a matching equilibrium with property that external partners with low learning costs for a project work with R\\&D units that also have low learning costs for the same project. Empirically, we use a dataset of ...

  4. Zumbro Hydroelectric Project: installation of third unit. Feasibility assessment report

    Energy Technology Data Exchange (ETDEWEB)

    Williamson, James V.

    1979-03-01

    The feasibility of adding a third generating unit at an existing hydro power plant near Rochester, Minn. was examined considering the economic, technical, and environmental aspects. Installation of the unit, aiming at an Oct. 1983 completion date, is recommended. (LCL)

  5. 24 CFR 970.31 - Replacement units.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement units. 970.31 Section... PUBLIC HOUSING PROGRAM-DEMOLITION OR DISPOSITION OF PUBLIC HOUSING PROJECTS § 970.31 Replacement units. Notwithstanding any other provision of law, replacement public housing units may be built on the original public...

  6. Order units in a C-algebra

    Indian Academy of Sciences (India)

    Abstract. Order unit property of a positive element in a *-algebra is defined. It is proved that precisely projections satisfy this order theoretic property. This way, unital hereditary *-subalgebras of a *-algebra are characterized.

  7. What is project finance?

    OpenAIRE

    João M. Pinto

    2017-01-01

    Project finance is the process of financing a specific economic unit that the sponsors create, in which creditors share much of the venture’s business risk and funding is obtained strictly for the project itself. Project finance creates value by reducing the costs of funding, maintaining the sponsors financial flexibility, increasing the leverage ratios, avoiding contamination risk, reducing corporate taxes, improving risk management, and reducing the costs associated with market ...

  8. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-06-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region.

  9. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region

  10. A Unified Method of Finding Laplace Transforms, Fourier Transforms, and Fourier Series. [and] An Inversion Method for Laplace Transforms, Fourier Transforms, and Fourier Series. Integral Transforms and Series Expansions. Modules and Monographs in Undergraduate Mathematics and Its Applications Project. UMAP Units 324 and 325.

    Science.gov (United States)

    Grimm, C. A.

    This document contains two units that examine integral transforms and series expansions. In the first module, the user is expected to learn how to use the unified method presented to obtain Laplace transforms, Fourier transforms, complex Fourier series, real Fourier series, and half-range sine series for given piecewise continuous functions. In…

  11. Central and Eastern United States (CEUS) Seismic Source Characterization (SSC) for Nuclear Facilities Project

    Energy Technology Data Exchange (ETDEWEB)

    Kevin J. Coppersmith; Lawrence A. Salomone; Chris W. Fuller; Laura L. Glaser; Kathryn L. Hanson; Ross D. Hartleb; William R. Lettis; Scott C. Lindvall; Stephen M. McDuffie; Robin K. McGuire; Gerry L. Stirewalt; Gabriel R. Toro; Robert R. Youngs; David L. Slayter; Serkan B. Bozkurt; Randolph J. Cumbest; Valentina Montaldo Falero; Roseanne C. Perman' Allison M. Shumway; Frank H. Syms; Martitia (Tish) P. Tuttle

    2012-01-31

    This report describes a new seismic source characterization (SSC) model for the Central and Eastern United States (CEUS). It will replace the Seismic Hazard Methodology for the Central and Eastern United States, EPRI Report NP-4726 (July 1986) and the Seismic Hazard Characterization of 69 Nuclear Plant Sites East of the Rocky Mountains, Lawrence Livermore National Laboratory Model, (Bernreuter et al., 1989). The objective of the CEUS SSC Project is to develop a new seismic source model for the CEUS using a Senior Seismic Hazard Analysis Committee (SSHAC) Level 3 assessment process. The goal of the SSHAC process is to represent the center, body, and range of technically defensible interpretations of the available data, models, and methods. Input to a probabilistic seismic hazard analysis (PSHA) consists of both seismic source characterization and ground motion characterization. These two components are used to calculate probabilistic hazard results (or seismic hazard curves) at a particular site. This report provides a new seismic source model. Results and Findings The product of this report is a regional CEUS SSC model. This model includes consideration of an updated database, full assessment and incorporation of uncertainties, and the range of diverse technical interpretations from the larger technical community. The SSC model will be widely applicable to the entire CEUS, so this project uses a ground motion model that includes generic variations to allow for a range of representative site conditions (deep soil, shallow soil, hard rock). Hazard and sensitivity calculations were conducted at seven test sites representative of different CEUS hazard environments. Challenges and Objectives The regional CEUS SSC model will be of value to readers who are involved in PSHA work, and who wish to use an updated SSC model. This model is based on a comprehensive and traceable process, in accordance with SSHAC guidelines in NUREG/CR-6372, Recommendations for Probabilistic

  12. United States History: From Community to Society. Unit Four: Revolutionary America. Grade Six. Project Social Studies.

    Science.gov (United States)

    Minnesota Univ., Minneapolis. Project Social Studies Curriculum Center.

    Revolution is the theme of this resource unit, which is the fourth in a social studies series designed for sixth grade students. In the first part of the unit, case studies are used to examine 18th century Boston, Williamsburg, and Philadelphia, contrasting them to 17th century Jamestown and Plymouth settlements. Emphasis is upon examining causes…

  13. Nurse managers' challenges in project management.

    Science.gov (United States)

    Suhonen, Marjo; Paasivaara, Leena

    2011-11-01

    To analyse the challenges that nurse managers meet in project management. Project management done by nurse managers has a significant role in the success of projects conducted in work units. The data were collected by open interviews (n = 14). The participants were nurse managers, nurses and public health nurses. Data analysis was carried out using qualitative content analysis. The three main challenges nurse managers faced in project management in health-care work units were: (1) apathetic organization and management, (2) paralysed work community and (3) cooperation between individuals being discouraged. Nurse managers' challenges in project management can be viewed from the perspective of the following paradoxes: (1) keeping up projects-ensuring patient care, (2) enthusiastic management-effective management of daily work and (3) supporting the work of a multiprofessional team-leadership of individual employees. It is important for nurse managers to learn to relate these paradoxes to one another in a positive way. Further research is needed, focusing on nurse managers' ability to promote workplace spirituality, nurse managers' emotional intelligence and their enthusiasm in small projects. © 2011 Blackwell Publishing Ltd.

  14. 28 CFR 541.47 - Admission to control unit.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Admission to control unit. 541.47 Section... INMATE DISCIPLINE AND SPECIAL HOUSING UNITS Control Unit Programs § 541.47 Admission to control unit. Staff shall provide an inmate admitted to a control unit with: (a) Notice of the projected duration of...

  15. Concentrating Solar Power Projects - Dish/Engine Projects | Concentrating

    Science.gov (United States)

    Solar Power | NREL Dish/Engine Projects Photo of several flat, octagonal panels arranged together to form a dish-shaped structure. The receiver is supported above the panels by an arm-like of the panels. These dish/Stirling units are being tested at Sandia National Laboratories in

  16. Oil Vulnerabilities and United States Strategy

    Science.gov (United States)

    2007-02-08

    Mazda, Mercedes - Benz , Ford, Mercury, and Nissan offer flexible fuel vehicles in the United States. Ethanol is currently produced in the United States...USAWC STRATEGY RESEARCH PROJECT OIL VULNERABILITIES AND UNITED STATES STRATEGY by Colonel Shawn P. Walsh...Colleges and Schools, 3624 Market Street, Philadelphia, PA 19104, (215) 662-5606. The Commission on Higher Education is an institutional accrediting

  17. Status and understanding of groundwater quality in the Sierra Nevada Regional study unit, 2008: California GAMA Priority Basin Project

    Science.gov (United States)

    Fram, Miranda S.; Belitz, Kenneth

    2014-01-01

    Groundwater quality in the Sierra Nevada Regional (SNR) study unit was investigated as part of the California State Water Resources Control Board’s Groundwater Ambient Monitoring and Assessment Program Priority Basin Project. The study was designed to provide statistically unbiased assessments of the quality of untreated groundwater within the primary aquifer system of the Sierra Nevada. The primary aquifer system for the SNR study unit was delineated by the depth intervals over which wells in the State of California’s database of public drinking-water supply wells are open or screened. Two types of assessments were made: (1) a status assessment that described the current quality of the groundwater resource, and (2) an evaluation of relations between groundwater quality and potential explanatory factors that represent characteristics of the primary aquifer system. The assessments characterize untreated groundwater quality, rather than the quality of treated drinking water delivered to consumers by water distributors.

  18. The Text of the Instrument connected with the Agency's Assistance to the United Arab Republic in Establishing a Project for Training and Medical Applications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1967-06-09

    The text of the Agreement between the Agency and the Government of the United Arab Republic in connection with the Agency's assistance to that Government in establishing a project for training and medical applications of atomic energy is reproduced in this document for the information of all Members.

  19. The Text of the Instrument connected with the Agency's Assistance to the United Arab Republic in Establishing a Project for Training and Medical Applications

    International Nuclear Information System (INIS)

    1967-01-01

    The text of the Agreement between the Agency and the Government of the United Arab Republic in connection with the Agency's assistance to that Government in establishing a project for training and medical applications of atomic energy is reproduced in this document for the information of all Members

  20. Methodology for cost estimate in projects for nuclear power plants decommissioning

    International Nuclear Information System (INIS)

    Salij, L.M.

    2008-01-01

    The conceptual approaches to cost estimating of nuclear power plants units decommissioning projects were determined. The international experience and national legislative and regulatory basis were analyzed. The possible decommissioning project cost classification was given. It was shown the role of project costs of nuclear power plant units decommissioning as the most important criterion for the main project decisions. The technical and economic estimation of deductions to common-branch fund of decommissioning projects financing was substantiated

  1. K-12 Project Management Education: NASA Hunch Projects

    Science.gov (United States)

    Morgan, Joe; Zhan, Wei; Leonard, Matt

    2013-01-01

    To increase the interest in science, technology, engineering, and math (STEM) among high school students, the National Aeronautics and Space Administration (NASA) created the "High Schools United with NASA to Create Hardware" (HUNCH) program. To enhance the experience of the students, NASA sponsored two additional projects that require…

  2. Aquatic Species Project report, FY 1989--1990

    Energy Technology Data Exchange (ETDEWEB)

    Brown, L.M.; Sprague, S.

    1992-01-01

    This report summarizes the progress and research accomplishments of the Aquatic Species Project. The four articles included are summaries of individual research projects and are entered into the EDB as such. The goal of the Aquatic Species Project is to develop the technology base for large-scale production of oil-rich microalgae. The project is also developing methods to convert the microalgal lipids into liquid fuels needed for industry and transportation. Researchers in the Aquatics Species Project focus on the use of microalgae as a feedstock for producing renewable, high-energy liquid fuels such as diesel. It is important for the United States to develop alternative renewable oil sources because 42% of the current energy market in the United States is for liquid fuels, and 38% of these fuels are imported. In 1979, the US Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) initiated the Aquatic Species Project as part of the overall effort in biofuels. The project began to focus exclusively on fuels from microalgae in 1982. Estimates show that the technology being developed by the project can provide as much as 7% of the total current energy demand. The program`s basic premise is that microalgae, which have been called the most productive biochemical factories in the world, can produce up to 30 times more oil per unit of growth area than land plants. Selected papers were processed separately for inclusion in the Energy Science and Technology Database.

  3. Decommissioning Unit Cost Data

    International Nuclear Information System (INIS)

    Sanford, P. C.; Stevens, J. L.; Brandt, R.

    2002-01-01

    The Rocky Flats Closure Site (Site) is in the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, and remediating environmental media. A number of contaminated facilities have been decommissioned, including one building, Building 779, that contained gloveboxes used for plutonium process development but did little actual plutonium processing. The actual costs incurred to decommission this facility formed much of the basis or standards used to estimate the decommissioning of the remaining plutonium-processing buildings. Recent decommissioning activities in the first actual production facility, Building 771, implemented a number of process and procedural improvements. These include methods for handling plutonium contaminated equipment, including size reduction, decontamination, and waste packaging, as well as management improvements to streamline planning and work control. These improvements resulted in a safer working environment and reduced project cost, as demonstrated in the overall project efficiency. The topic of this paper is the analysis of how this improved efficiency is reflected in recent unit costs for activities specific to the decommissioning of plutonium facilities. This analysis will allow the Site to quantify the impacts on future Rocky Flats decommissioning activities, and to develop data for planning and cost estimating the decommissioning of future facilities. The paper discusses the methods used to collect and arrange the project data from the individual work areas within Building 771. Regression and data correlation techniques were used to quantify values for different types of decommissioning activities. The discussion includes the approach to identify and allocate overall project support, waste management, and Site support costs based on the overall Site and project costs to provide a ''burdened'' unit cost. The paper ultimately provides a unit cost basis that can be used to support cost estimates for

  4. Draft environmental statement related to the operation of South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499). Houston Lighting and Power Company

    International Nuclear Information System (INIS)

    1986-03-01

    This Draft Environmental Statement contains the second assessment of the environmental impact associated with the operation of the South Texas Project, Units 1 and 2, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the ''Code of Federal Regulations,'' Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environmental impacts, environmental consequences and mitigating actions, and environmental and economic benefits and costs associated with station operation. Land use and terrestrial and aquatic ecological impacts will be small. No operational impacts to historic and archaeological sites are anticipated. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. Socioeconomic impacts of the project are anticipated to be minimal. The action called for is the issuance of an operating license for South Texas Project, Units 1 and 2

  5. Improving Nursing Communication Skills in an Intensive Care Unit Using Simulation and Nursing Crew Resource Management Strategies: An Implementation Project.

    Science.gov (United States)

    Turkelson, Carman; Aebersold, Michelle; Redman, Richard; Tschannen, Dana

    Effective interprofessional communication is critical to patient safety. This pre-/postimplementation project used a multifaceted educational strategy with high-fidelity simulation to introduce evidence-based communication tools, adapted from Nursing Crew Resource Management, to intensive care unit nurses. Results indicated that participants were satisfied with the education, and their perceptions of interprofessional communication and knowledge improved. Teams (n = 16) that used the communication tools during simulation were more likely to identify the problem, initiate key interventions, and have positive outcomes.

  6. Santee Cooper cross units 3 & 4: an EPCM success

    Energy Technology Data Exchange (ETDEWEB)

    Hickson, K.; Neher, S.; Koontz, N. [WorleyParons (United States)

    2009-05-15

    In late 2001, Santee Cooper began a project to add a third 600 MW unit to its coal-fired Cross Generating Station in Cross, S.C. Plans also included a fourth unit to be added later. The engineering, procurement and construction (EPCM) of Units 3 and 4 would eventually span almost seven years. The Cross Project demonstrates how Santee Cooper empowered its EPCM contractor to manage for change and how a well conceived plan and thoroughly developed schedule provide the necessary structure and flexibility to successful do so. The Cross Project experience reinforces the idea that for large projects an EPCM arrangement provides the agility necessary to manage change and the means to manage risk. The design, furnish and erect contracts were performance based contracts executed early to firm up the plant design and layout. 2 photos.

  7. Thin Film Photovoltaic Partnership Project | Photovoltaic Research | NREL

    Science.gov (United States)

    Thin Film Photovoltaic Partnership Project Thin Film Photovoltaic Partnership Project NREL's Thin Film Photovoltaic (PV) Partnership Project led R&D on emerging thin-film solar technologies in the United States from 1994 to 2009. The project made many advances in thin-film PV technologies that allowed

  8. [Work setting, satisfaction and burnout of the nurses in critical care units and hospitalization units. RN4CAST-Spain project].

    Science.gov (United States)

    Fuentelsaz-Gallego, C; Moreno-Casbas, T; Gómez-García, T; González-María, E

    2013-01-01

    To know if there are differences between the critical care units and the medical-surgical care units regarding the perception of the nurses working in National Health System hospitals about their work environment, burnout level and job satisfaction. A cross-sectional study was conducted with 6,417 nurses from the medical-surgical care units and with 1,122 nurses from critical care units of 59 Spanish hospitals with more than 150 beds. Socio-demographic, job satisfaction, perception of work environment (Practice Environment Scale of the Nursing Work Index [PES-NWI questionnaire]) and burnout measured with the Maslach Burnout Inventory (MBI) data were collected. The PES-NWI showed differences in 4 out of its 5 factors. It showed better values in medical-surgical units in all the factors, except for Staffing and resource adequacy (P<.001), where critical care units showed a mean level of agreement of 2.41 versus 2.19 for the medical-surgical units. Regarding burnout, this was higher in the medical-surgical care units (P=.039) where 23% (952) of the nurses had high levels. Job satisfaction was lower in the critical care units (P=.044) with 70% (578) of nurses being very or strongly satisfied. The opinion of the nurses, working in critical care units about their hospital is unfavorable. They showed lower levels of burnout than those working in medical-surgical units. Copyright © 2013 Elsevier España, S.L. y SEEIUC. All rights reserved.

  9. United States rejoin ITER

    International Nuclear Information System (INIS)

    Roberts, M.

    2003-01-01

    Upon pressure from the United States Congress, the US Department of Energy had to withdraw from further American participation in the ITER Engineering Design Activities after the end of its commitment to the EDA in July 1998. In the years since that time, changes have taken place in both the ITER activity and the US fusion community's position on burning plasma physics. Reflecting the interest in the United States in pursuing burning plasma physics, the DOE's Office of Science commissioned three studies as part of its examination of the option of entering the Negotiations on the Agreement on the Establishment of the International Fusion Energy Organization for the Joint Implementation of the ITER Project. These were a National Academy Review Panel Report supporting the burning plasma mission; a Fusion Energy Sciences Advisory Committee (FESAC) report confirming the role of ITER in achieving fusion power production, and The Lehman Review of the ITER project costing and project management processes (for the latter one, see ITER CTA Newsletter, no. 15, December 2002). All three studies have endorsed the US return to the ITER activities. This historical decision was announced by DOE Secretary Abraham during his remarks to employees of the Department's Princeton Plasma Physics Laboratory. The United States will be working with the other Participants in the ITER Negotiations on the Agreement and is preparing to participate in the ITA

  10. The status of US Teraflops-scale projects

    International Nuclear Information System (INIS)

    Mawhinney, R.D.

    1995-01-01

    The current status of United States projects pursuing Teraflops-scale computing resources for lattice field theory is discussed. Two projects are in existence at this time: the Multidisciplinary Teraflops Project, incorporating the physicists of the QCD Teraflops Collaboration, and a smaller project, centered at Columbia, involving the design and construction of a 0.8Teraflops computer primarily for QCD. ((orig.))

  11. The TIMSS Videotape Classroom Study: Methods and Findings from an Exploratory Research Project on Eighth-Grade Mathematics Instruction in Germany, Japan, and the United States.

    Science.gov (United States)

    Stigler, James W.; Gonzales, Patrick; Kawanaka, Takako; Knoll, Steffen; Serrano, Ana

    1999-01-01

    Describes the methods and preliminary findings of the Videotape Classroom Study, a video survey of eighth-grade mathematics lessons in Germany, Japan, and the United States. Part of the Third International Mathematics and Science study, this research project is the first study of videotaped records from national probability samples. (SLD)

  12. Barakah Project in UAE

    Energy Technology Data Exchange (ETDEWEB)

    Petrunik, K. [Emirates Nuclear Energy Corp., Abu Dhabi (United Arab Emirates)

    2014-07-01

    This paper reviews the Barakah Project in United Arab Emirates (UAE). Development of UAE nuclear power plant programme is proceeding and construction is well under way. Nuclear energy is a compelling solution to energy demand in the UAE. Economics, environment, energy security, diversification and industrial development are the key drivers of this program. The project continues ro meet construction milestones, capacity building and training on UAE Nationals.

  13. Feasibility study report for Operable Unit 4: Fernald Environmental Management Project, Fernald, Ohio: Remedial investigation and feasibility study: Volume 3: Final report

    International Nuclear Information System (INIS)

    1994-02-01

    This report documents the Feasibility Study (FS) phase of the Fernald Environmental Management Project (FEMP) Operable Unit 4 Remedial Investigation/Feasibility Study (RI/FS) Program. The FEMP, formerly known as the Feed Materials Production Center (FMPC), is a US Department of Energy (DOE) facility that operated from 1952 to 1989. The facility's primarily function was to provide high purity uranium metal products to support United States defense programs. Production operations were suspended in 1989 to focus on environmental restoration and waste management activities at the facility. The RI/FS is being conducted pursuant to the terms of a Consent Agreement between DOE and the US Environmental Protection Agency (EPA) under Sections 120 and 106(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. The Ohio Environmental Protection Agency (OEPA) is also participating in the RI/FS process at the FEMP through direct involvement in program review meetings and technical review of project documentation. The objective of the RI/FS process is to gather information to support an informed risk management decision regarding which remedy appears to be the most appropriate action for addressing the environmental concerns identified at the FEMP. This volume contains appendices F--J

  14. Centrifugation and the Manhattan Project

    Science.gov (United States)

    Reed, Cameron

    2009-05-01

    A study of U. S. Army Manhattan Engineer District documents reveals that consideration of centrifugation as a means of uranium enrichment during World War II was considerably more extensive than is commonly appreciated. By the time the centrifuge project was abandoned in early 1944 a full-scale prototype unit had been fabricated and tested at near-production speeds, enrichments of close to theoretically-expected levels had been demonstrated with pilot-plant units, and plans for production plants had been developed. This paper will review the history of this little-known aspect of the Project and examine the circumstances of how it came to be discontinued.

  15. Environmental Control Plan for the 300-FF-1 Operable Unit Remedial Action

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2000-01-01

    This environmental control plan is for the 300-FF-1 Operable Unit Remedial Action Project. The purpose of this plan is to identify environmental requirements for the 300-FF-1 operable unit Remedial Action/Waste Disposal Project

  16. National Lexicography Units: Past, Present, Future

    African Journals Online (AJOL)

    Mariëtta Alberts, Research Unit for Languages and Literature in SA Context,. Northwest ..... NLUs were also assisted with the marketing of the units and the obtaining .... each dictionary project, and developing an editorial style guide for each dic- .... The DSAE edited the South African Concise Oxford Dictionary that was.

  17. 49 CFR 268.17 - Project selection criteria.

    Science.gov (United States)

    2010-10-01

    ... criteria will govern FRA's selection of projects to receive funding under the Maglev Deployment Program. (a... are to be expected in the United States. (4) The degree to which the project will augment a Maglev... development status of the Maglev technology selected by the applicant for the project. (c) Benefits for the...

  18. Financing power projects in emerging markets

    International Nuclear Information System (INIS)

    Matsumoto, G.T.

    1996-01-01

    Financing for power generation projects in the developing countries of the world has been provided by the United States Export-Import Bank. The loans provided by its new Project Finance Division, totalling $8.3 billion are described. The future of project financing for the power generation industry should, it is argued, rest not with government financing agencies, but with private sector financial markets. (UK)

  19. Modernization project of the rod control system and in-core instrumentation system for 34 units of the 900 MW French EDF fleet

    International Nuclear Information System (INIS)

    Tavolara, Ivan; Desgeorge, Romain; Verburgh, Pierre

    2014-01-01

    Rolls-Royce and Cegelec, in partnership, carry out a unique and considerable modernisation project of two Instrumentation and Control (I and C) systems for the entire 900 MWe fleet of Electricite De France (EDF). Both rod control (RCS) and reactor in-core measurement (RIC) systems are to be modernised in the frame of the third ten-year renovation of all 34 reactor units over 9 power plants. The RCS contributes to the control of nuclear power by actuating control rod drive mechanisms that allow insertion or withdrawal of control rods. The RCS has also monitoring functions such as controlling the actual rods' position as well as the functional consistency between commands and actual positions. The RIC system measures in-core neutron flux, providing useful information to the control room as well as to the reactor unit computer for further processing. The renovated systems shall replace the existing ageing analog technology by modern digital technology based on PLC (Programmable Logic Controllers) and FPGA (Field-Programmable Gate Array) in the case of power subassemblies of RCS. Both systems rely for certain functions on a common network linking the RCS and RIC networks, improving operations and maintenance thanks to a powerful Man Machine Interface at the different locations of the systems with an extensive suite of tools and diagnostic menus. The project whose design phase started in July 2006 is now in its deployment phase after the successful site implementation of both systems at the first of kind units of Tricastin and Fessenheim power plants, respectively in August 2009 and February 2010. With 20 units in operation in 2014, the deployment shall continue with the other 14 until 2020. Rolls-Royce has a broad range of civil nuclear expertise, including work related to licensing and safety reviews, engineering design, supply chain management, manufacturing, installation and commissioning of the nuclear island systems and equipment, as well as operational

  20. Successful Project Based Learning (PBL) Across Disciplines Geared Towards Middle School: An Example from a Wetlands PBL Unit in Reno, Nevada, USA

    Science.gov (United States)

    Howard, K. L.; Suchy-Mabrouk, A.; Noble, P. J.; Mensing, S. A.; Ewing-Taylor, J.

    2014-12-01

    A growing need for broad dissemination of current scientific research and improved scientific literacy requires new models of professional development that allow for direct collaboration between educators and university researchers. One example is a project funded by the National Science Foundation (NSF) as part of a study titled, "Reconstructing 2500 years of environmental change at the periphery of Rome: Integrating paleoecology and socioeconomic history to understand human response to climate." This project involves a team of middle school teachers working with researchers at the University of Nevada, Reno (UNR) to gain first-hand knowledge in multidisciplinary research connecting science and society, and applies a similar approach in the classroom. In 2013, the team's science teacher traveled to Italy as a member of the science research group. A series of workshops introduced the remaining teachers to the research project. Teachers collaborated to develop a Project Based Learning (PBL) unit that incorporated Next Generation Science Standards and encompassed English, Social Studies, Math, and Science curricula using a pedagogical approach different from the single subject-based PBL's usually taught in their school district. The PBL unit draws on the NSF study and focuses on exploring the balance between economic and environmental issues surrounding local wetlands. In May 2014, 160 middle school students worked in groups to create and test a question about physio-chemical parameters in a nearby wetland and used these data to discuss local economic development. Initially, students claimed polarized views of environmental issues or economic development interests; however, during a multimedia session showcasing results, students communicated more informed perspectives that clearly incorporated knowledge gained from their own research. Some students were able to make recommendations for good practices involving planned economic development near the wetland

  1. Integrated Ground Operations Demonstration Units

    Data.gov (United States)

    National Aeronautics and Space Administration — The overall goal of the AES Integrated Ground Operations Demonstration Units (IGODU) project is to demonstrate cost efficient cryogenic operations on a relevant...

  2. A web-based tool for the Comprehensive Unit-based Safety Program (CUSP).

    Science.gov (United States)

    Pronovost, Peter J; King, Jay; Holzmueller, Christine G; Sawyer, Melinda; Bivens, Shauna; Michael, Michelle; Haig, Kathy; Paine, Lori; Moore, Dana; Miller, Marlene

    2006-03-01

    An organization's ability to change is driven by its culture, which in turn has a significant impact on safety. The six-step Comprehensive Unit-Based Safety Program (CUSP) is intended to improve local culture and safety. A Web-based project management tool for CUSP was developed and then pilot tested at two hospitals. HOW ECUSP WORKS: Once a patient safety concern is identified (step 3), a unit-level interdisciplinary safety committee determines issue criticality and starts up the projects (step 4), which are managed using project management tools within eCUSP (step 5). On a project's completion, the results are disseminated through a shared story (step 6). OSF St. Joseph's Medical Center-The Medical Birthing Center (Bloomington, Illinois), identified 11 safety issues, implemented 11 projects, and created 9 shared stories--including one for its Armband Project. The Johns Hopkins Hospital (Baltimore) Medical Progressive Care (MPC4) Unit identified 5 safety issues and implemented 4 ongoing projects, including the intravenous (IV) Tubing Compliance Project. The eCUSP tool's success depends on an organizational commitment to creating a culture of safety.

  3. Economic case for CANDU life extension projects

    International Nuclear Information System (INIS)

    Qureshi, S.; Tenev, T.; Lewi, M.

    2014-01-01

    As CANDU reactors approach their original end of design life utilities are faced with two options: to extend the operating life of the reactor by undergoing a life extension project (LEP), or to commence decommissioning activities. Recent project experience has shown that there is economic merit in extending the life of the operating reactor. There are many benefits to such a decision, the most obvious being the revenue that will be generated from the additional years of electricity production by the utility. Delays in decommissioning are also advantageous since the large costs associated with such a long-term activity are pushed into the future, thereby decreasing the net present value (NPV) of the investment. In addition, relatively few power reactors have been fully decommissioned to date and deferring this activity transfers the associated risks to others that are currently obligated to undertake decommissioning activities sooner. Candu Energy has been involved with the life extension projects of the following CANDU reactors: Point Lepreau (New Brunswick, Canada), Bruce Unit 1 and Unit 2 (Ontario, Canada), and Wolsong Unit 1 (South Korea). These reactors underwent fuel channel replacement programs in addition to replacement of major reactor components. Most recently, both Ontario Power Generation (OPG) and Nucleoelectrica Argentina Sociedad Anonima (NA-SA) have commenced work on life extension projects at the Darlington (Canada) and Embalse (Argentina) sites respectively. The experience gained from previous LEP projects allows Candu Energy to deliver future projects in a timely, efficient, and cost effective manner. (author)

  4. [Control of intubator associated pneumonia in intensive care unit: results of the GISIO-SItI SPIN-UTI Project].

    Science.gov (United States)

    Agodi, Antonella; Auxilia, Francesco; Barchitta, Martina; D'Errico, Marcello Mario; Montagna, Maria Teresa; Pasquarella, Cesira; Tardivo, Stefano; Mura, Ida

    2014-01-01

    To document reported Intubator Associated Pneumonia (IAP) prevention practices in Intensive Care Units (ICUs) and attitudes towards the implementation of a measurement system. In the framework of the SPIN-UTI project the «Italian Nosocomial Infections Surveillance in ICUs network», two questionnaires were made available online. The first was filled out by physicians working in ICUs in order to collect data on characteristics of physicians and ICUs, on clinical and measurement practices for IAP prevention, and attitudes towards the implementation of a measurement system. The second questionnaire was filled out for each intubated patient in order to collect data on prevention practices during ICU stay. ICUs participating to the fourth edition (2012-2013) of the SPIN-UTI project. Compliance to the component of the European bundle. The components of the bundle for the prevention of IAP are implemented, although to a different level, in the 26 participating ICUs. Overall compliance to all five practices of the European bundle has been reported in 21.1% of the 768 included patients. The present survey has documented a large potential for improvement in clinical and non-clinical practices aimed at preventing IAP in ICUs.

  5. Transnational Body Projects: Media Representations of Cosmetic Surgery Tourism in Argentina and the United States

    Directory of Open Access Journals (Sweden)

    Erynn Masi de Casanova

    2015-08-01

    Full Text Available Cosmetic surgery tourism (CST is part of the growing trend known as medical tourism. As people in the global North travel to less affluent countries to modify their bodies through cosmetic surgery, their transnational body projects are influenced by both economic "materialities" and traveling cultural "imaginaries." This article presents a content analysis of media representations of cosmetic surgery tourism in a major country sending patient-tourists (the United States and a popular receiving country (Argentina. The power relations of globalization appear to be played out in the media. U.S. sources assert U.S. hegemony through a discourse emphasizing the risks of CST in the global South, in contrast with medical excellence in the U.S. Argentine sources portray Argentina as a country struggling to gain a foothold in the global economy, but staking a claim on modernity through cultural and professional resources. The analyzed articles also offer a glimpse of how patient-tourists fuel sectors of the global economy by placing their bodies at the forefront, seeking to merge medical procedures and touristic pleasures. There is a gender dimension to these portrayals, as women are especially likely to engage in CST. Their transnational body projects are tainted by negative media portrayals, which represent them as ignorant, uninformed, and driven mainly by the low price of surgery overseas. Our comparative approach sheds light on converging and diverging perspectives on both ends of the cosmetic surgery tourism chain, showing that patterns in CST portrayals differ according to the position of a country in the world-system.

  6. Demonstration Project 111, ITS/CVO Technology Truck, Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Gambrell, KP

    2002-01-11

    In 1995, the planning and building processes began to design and develop a mobile demonstration unit that could travel across the nation and be used as an effective outreach tool. In 1997, the unit was completed; and from June 1997 until December 2000, the Federal Highway Administration (FHWA)/Federal Motor Carrier Safety Administration (FMCSA) mobilized the Technology Truck, also known as Demonstration Project No. 111, ''Advanced Motor Carrier Operations and Safety Technologies.'' The project featured the latest available state-of-the-practice intelligent transportation systems (ITS) technologies designed to improve both the efficiency and safety of commercial vehicle operations (CVO). The Technology Truck was designed to inform and educate the motor carrier community and other stakeholders regarding ITS technologies, thus gaining support and buy-in for participation in the ITS program. The primary objective of the project was to demonstrate new and emerging ITS/CVO technologies and programs, showing their impact on motor carrier safety and productivity. In order to meet the objectives of the Technology Truck project, the FHWA/FMCSA formed public/private partnerships with industry and with Oak Ridge National Laboratory to demonstrate and display available ITS/CVO technologies in a cooperative effort. The mobile demonstration unit was showcased at national and regional conferences, symposiums, universities, truck shows and other venues, in an effort to reach as many potential users and decision makers as possible. By the end of the touring phase, the ITS/CVO Technology Truck had been demonstrated in 38 states, 4 Canadian provinces, 88 cities, and 114 events; been toured by 18,099 people; and traveled 115,233 miles. The market penetration for the Technology Truck exceeded 4,000,000, and the website received more than 25,000 hits. In addition to the Truck's visits, the portable ITS/CVO kiosk was demonstrated at 31 events in 23 cites in 15

  7. Current status of the KNPP units 1 to 4 decommissioning projects

    International Nuclear Information System (INIS)

    Benbow, R.

    2010-01-01

    The PMU has been established in support of the KNPP Decommissioning Division. All of the Infrastructure Projects associated with Decommissioning have been identified. All the major projects are either in Contract or have the Tender Packages prepared and are being managed/implemented through the EBRD Procurement Process. KNPP Decommissioning is being supported with the necessary documentation, tools and equipment

  8. The impact of occupational health and safety regulations on prevention through design in construction projects: Perspectives from Spain and the United Kingdom.

    Science.gov (United States)

    Martínez-Aires, María Dolores; Rubio Gámez, María Carmen; Gibb, Alistair

    2015-01-01

    Since the mid-1990 s, Prevention through Design (PtD) has become increasingly prevalent in the built environment. The acceptance of PtD has largely been due to the removal or reduction of risks during the execution phase of construction projects. European States have had the added impetus of national legislation. This paper analyzes the influence of European Union Directive 92/57/EEC on occupational safety and health injury prevention in the project design phase. Qualitative methods comprised individual semi-structured interviews and focus groups with a panel of experts. Sixty individuals from construction and related professions (architects, engineers, constructors, developers, and other construction experts) answered 17 key questions to establish national perceptions of the effectiveness of Directive 92/57/EEC in Spain and the United Kingdom (UK). The implementation of PtD in the project design phase in the UK is clearer since the regulations explicitly state the obligations of project designers as well as those of the coordinator. Interviews with Spanish experts show that, in Spain, the prevention culture is less frequently realized. The most significant differences between the European Directive and national regulations which influence PtD are linked to the Health and Safety Coordinator, and Health and Safety documents.

  9. South Texas project, Units 1 and 2: Final environmental statement (Docket Nos. 50-498 and 50-499)

    International Nuclear Information System (INIS)

    1975-03-01

    The proposed action is the issuance of a construction permit to the Houston Lighting and the Power Company, acting as Project manager on behalf of itself, the City Public Service Board of San Antonio, Central Power and Light Company, and the City of Austin, for the construction of the South Texas Project (STP) Units 1 and 2, located in Matagorda County, Texas. A total of 12,352 acres will be utilized for the STP site. Construction-related activities on the site will disturb about 610 acres not including the 7310 acres of inundated by the STP cooling lake and embankments, which will be constructed in conjunction with the project. Approximately 400 miles of transmission-line corridors will require about 5685 acres of land for the right-of-way. An access road and a railroad spur will affect about 60 acres. Farm to Market Road 521 will be rerouted north around the STP exclusion area. Plant construction will involve extensive community impacts. Two families will be displaced from the site. Traffic on local roads will increase due to construction and commuting activities. The influx of construction workers' families (2100 peak work force) is expected to cause no major housing or school problems. There will be a demand for increased services in Matagorda County. The proposed plan to alter Little Robbins Slough and the resultant 65% reduction in the watershed supplying freshwater inflow to the upper marsh may cause the displacement of numerous freshwater species and reduce its desirability as a nursery for estuarine-dependent organisms. Studies to determine the need for freshwater makeup will be required. 39 figs., 76 tabs

  10. Global Entrepreneurship and the United States

    Science.gov (United States)

    2010-09-01

    Global Entrepreneurship and the United States by Zoltan J. Acs Laszlo Szerb Ruxton, MD 21204 for under contract number SBAHQ-09...SUBTITLE Global Entrepreneurship and the United States 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT...3 2.1. Assessing Entrepreneurship ..................................................................................4 2.2. Stages of Development

  11. Implications of projected climate change for groundwater recharge in the western United States

    Science.gov (United States)

    Meixner, Thomas; Manning, Andrew H.; Stonestrom, David A.; Allen, Diana M.; Ajami, Hoori; Blasch, Kyle W.; Brookfield, Andrea E.; Castro, Christopher L.; Clark, Jordan F.; Gochis, David J.; Flint, Alan L.; Neff, Kirstin L.; Niraula, Rewati; Rodell, Matthew; Scanlon, Bridget R.; Singha, Kamini; Walvoord, Michelle A.

    2016-03-01

    Existing studies on the impacts of climate change on groundwater recharge are either global or basin/location-specific. The global studies lack the specificity to inform decision making, while the local studies do little to clarify potential changes over large regions (major river basins, states, or groups of states), a scale often important in the development of water policy. An analysis of the potential impact of climate change on groundwater recharge across the western United States (west of 100° longitude) is presented synthesizing existing studies and applying current knowledge of recharge processes and amounts. Eight representative aquifers located across the region were evaluated. For each aquifer published recharge budget components were converted into four standard recharge mechanisms: diffuse, focused, irrigation, and mountain-systems recharge. Future changes in individual recharge mechanisms and total recharge were then estimated for each aquifer. Model-based studies of projected climate-change effects on recharge were available and utilized for half of the aquifers. For the remainder, forecasted changes in temperature and precipitation were logically propagated through each recharge mechanism producing qualitative estimates of direction of changes in recharge only (not magnitude). Several key patterns emerge from the analysis. First, the available estimates indicate average declines of 10-20% in total recharge across the southern aquifers, but with a wide range of uncertainty that includes no change. Second, the northern set of aquifers will likely incur little change to slight increases in total recharge. Third, mountain system recharge is expected to decline across much of the region due to decreased snowpack, with that impact lessening with higher elevation and latitude. Factors contributing the greatest uncertainty in the estimates include: (1) limited studies quantitatively coupling climate projections to recharge estimation methods using detailed

  12. Implications of projected climate change for groundwater recharge in the western United States

    Science.gov (United States)

    Meixner, Thomas; Manning, Andrew H.; Stonestrom, David A.; Allen, Diana M.; Ajami, Hoori; Blasch, Kyle W.; Brookfield, Andrea E.; Castro, Christopher L.; Clark, Jordan F.; Gochis, David; Flint, Alan L.; Neff, Kirstin L.; Niraula, Rewati; Rodell, Matthew; Scanlon, Bridget R.; Singha, Kamini; Walvoord, Michelle Ann

    2016-01-01

    Existing studies on the impacts of climate change on groundwater recharge are either global or basin/location-specific. The global studies lack the specificity to inform decision making, while the local studies do little to clarify potential changes over large regions (major river basins, states, or groups of states), a scale often important in the development of water policy. An analysis of the potential impact of climate change on groundwater recharge across the western United States (west of 100° longitude) is presented synthesizing existing studies and applying current knowledge of recharge processes and amounts. Eight representative aquifers located across the region were evaluated. For each aquifer published recharge budget components were converted into four standard recharge mechanisms: diffuse, focused, irrigation, and mountain-systems recharge. Future changes in individual recharge mechanisms and total recharge were then estimated for each aquifer. Model-based studies of projected climate-change effects on recharge were available and utilized for half of the aquifers. For the remainder, forecasted changes in temperature and precipitation were logically propagated through each recharge mechanism producing qualitative estimates of direction of changes in recharge only (not magnitude). Several key patterns emerge from the analysis. First, the available estimates indicate average declines of 10–20% in total recharge across the southern aquifers, but with a wide range of uncertainty that includes no change. Second, the northern set of aquifers will likely incur little change to slight increases in total recharge. Third, mountain system recharge is expected to decline across much of the region due to decreased snowpack, with that impact lessening with higher elevation and latitude. Factors contributing the greatest uncertainty in the estimates include: (1) limited studies quantitatively coupling climate projections to recharge estimation methods using

  13. Peer-to-peer nursing rounds and hospital-acquired pressure ulcer prevalence in a surgical intensive care unit: a quality improvement project.

    Science.gov (United States)

    Kelleher, Alyson Dare; Moorer, Amanda; Makic, MaryBeth Flynn

    2012-01-01

    We conducted a quality improvement project in order to evaluate the effect of nurse-to-nurse bedside "rounding" as a strategy to decrease hospital-acquired pressure ulcers (HAPU) in a surgical intensive care unit. We instituted weekly peer-to-peer bedside skin rounds in a 17-bed surgical intensive care unit. Two nurses were identified as skin champions and trained by the hospital's certified WOC nurse to conduct skin rounds. The skin champion nurses conducted weekly peer-to-peer rounds that included discussions about key elements of our patients' skin status including current Braden Scale for Pressure Sore Risk score, and implementation of specific interventions related to subscale risk assessment. If a pressure ulcer was present, the current action plan was reevaluated for effectiveness. Quarterly HAPU prevalence studies were conducted from January 2008 to December 2010. Nineteen patients experienced a HAPU: 17 were located on the coccyx and 2 on the heel. Ten ulcers were classified as stage II, 3 PU were stage IV, 5 were deemed unstageable, and 1 was classified as a deep tissue injury. The frequency of preventive interventions rose during our quality improvement project. Specifically, the use of prevention surfaces increased 92%, repositioning increased 30%, nutrition interventions increased 77%, and moisture management increased 100%. Prior to focused nursing rounds, the highest HAPU prevalence rate was 27%. After implementing focused nursing rounds, HAPU rates trended down and were 0% for 3 consecutive quarters.

  14. Greenidge Multi-Pollutant Control Project

    Energy Technology Data Exchange (ETDEWEB)

    Connell, Daniel

    2008-10-18

    The Greenidge Multi-Pollutant Control Project was conducted as part of the U.S. Department of Energy's Power Plant Improvement Initiative to demonstrate an innovative combination of air pollution control technologies that can cost-effectively reduce emissions of SO{sub 2}, NO{sub x}, Hg, acid gases (SO{sub 3}, HCl, and HF), and particulate matter from smaller coal-fired electric generating units (EGUs). There are about 400 units in the United States with capacities of 50-300 MW that currently are not equipped with selective catalytic reduction (SCR), flue gas desulfurization (FGD), or mercury control systems. Many of these units, which collectively represent more than 55 GW of installed capacity, are difficult to retrofit for deep emission reductions because of space constraints and unfavorable economies of scale, making them increasingly vulnerable to retirement or fuel switching in the face of progressively more stringent environmental regulations. The Greenidge Project sought to confirm the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs by offering a combination of deep emission reductions, low capital costs, small space requirements, applicability to high-sulfur coals, mechanical simplicity, and operational flexibility. The multi-pollutant control system includes a NO{sub x}OUT CASCADE{reg_sign} hybrid selective non-catalytic reduction (SNCR)/in-duct SCR system for NO{sub x} control and a Turbosorp{reg_sign} circulating fluidized bed dry scrubbing system (with a new baghouse) for SO{sub 2}, SO{sub 3}, HCl, HF, and particulate matter control. Mercury removal is provided as a co-benefit of the in-duct SCR, dry scrubber, and baghouse, and by injection of activated carbon upstream of the scrubber, if required. The multi-pollutant control system was installed and tested on the 107-MW{sub e}, 1953-vintage AES Greenidge Unit 4 by a team including

  15. Milliken Station Demonstration Project FDG retrofit update

    Energy Technology Data Exchange (ETDEWEB)

    Alder, R.C.; Jackson, C.E.; O`Dea, D.T. [and others

    1994-12-31

    The Milliken Clean Coal Demonstration Project is one of the nine Clean Coal Projects selected for funding in Round 4 of the U.S. DOE`s Clean Coal Demonstration Program. The project`s sponsor is New York State Electric and Gas Corporation (NYSEG). Project team members include CONSOL Inc., Saarberg-Holter-Umwelttechnik (SHU), NALCO/FuelTech, Stebbins Engineering and Manufacturing Co., DHR Technologies, and CE Air Preheater. Gilbert/Commonwealth is the Architect/Engineer and Construction Manager for the flue gas desulfurization (FGD) retrofit. The project will provide full-scale demonstration of a combination of innovative emission-reducing technologies and plant upgraded for the control of sulfur dioxide (SO{sub 2}) and nitrogen oxides (NO{sub x}) emissions from a coal-fired steam generator without a significant loss of station efficiency. The overall project goals are the following: 98% SO{sub 2} removal efficiency using limestone while burning high sulfur coal; up to 70% NO{sub x} reduction using the NOXOUT selective non-catalytic reduction (SNCR) technology in conjunction with combustion modifications; minimization of solid waste by producing marketable by-products including commercial grade gypsum, calcium chloride, and fly ash; zero wastewater discharge; maintenance of station efficiency by using a high efficiency heat-pipe air heater system and a low-power-consuming scrubber system. The demonstration project is being conducted at NYSEG`s Milliken Station, located in Lansing, New York. Milliken Station has two 150-MWe pulverized coal-fired units built in the 1950s by Combustion Engineering. The SHU FGD process and the combustion modifications are being installed on both units, but the NOXOUT process, Plant Economic Optimization Advisor (PEOA), and the high-efficiency air heater system will be installed on only one unit.

  16. The Southern Forest Futures Project: technical report

    Science.gov (United States)

    David N. Wear; John G. Greis

    2013-01-01

    Please visit the Southern Forest Futures Project website for more information.The Southern Forest Futures Project provides a science-based “futuring” analysis of the forests of the 13 States of the Southeastern United States. With findings...

  17. Valuing the Leadership Role of University Unit Coordinators

    Science.gov (United States)

    Pepper, Coral; Roberts, Susan

    2016-01-01

    In this paper we describe the experiences of 64 unit coordinators across 15 Australian universities, gathered during 2011/2012 as part of an Office for Learning and Teaching (OLT) project. Our intention was to gain insight into how unit coordinators (academics who coordinate a discrete unit of study) perceive their role as leaders of learning in…

  18. Multi-objective genetic optimization of linear construction projects

    Directory of Open Access Journals (Sweden)

    Fatma A. Agrama

    2012-08-01

    Full Text Available In the real world, the majority cases of optimization problems, met by engineers, are composed of several conflicting objectives. This paper presents an approach for a multi-objective optimization model for scheduling linear construction projects. Linear construction projects have many identical units wherein activities repeat from one unit to another. Highway, pipeline, and tunnels are good examples that exhibit repetitive characteristics. These projects represent a large portion of the construction industry. The present model enables construction planners to generate optimal/near-optimal construction plans that minimize project duration, total work interruptions, and total number of crews. Each of these plans identifies, from a set of feasible alternatives, optimal crew synchronization for each activity and activity interruptions at each unit. This model satisfies the following aspects: (1 it is based on the line of balance technique; (2 it considers non-serial typical activities networks with finish–start relationship and both lag or overlap time between activities is allowed; (3 it utilizes a multi-objective genetic algorithms approach; (4 it is developed as a spreadsheet template that is easy to use. Details of the model with visual charts are presented. An application example is analyzed to illustrate the use of the model and demonstrate its capabilities in optimizing the scheduling of linear construction projects.

  19. Human Genome Project

    Energy Technology Data Exchange (ETDEWEB)

    Block, S. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Cornwall, J. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Dally, W. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Dyson, F. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Fortson, N. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Joyce, G. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Kimble, H. J. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Lewis, N. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Max, C. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Prince, T. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Schwitters, R. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Weinberger, P. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Woodin, W. H. [The MITRE Corporation, McLean, VA (US). JASON Program Office

    1998-01-04

    The study reviews Department of Energy supported aspects of the United States Human Genome Project, the joint National Institutes of Health/Department of Energy program to characterize all human genetic material, to discover the set of human genes, and to render them accessible for further biological study. The study concentrates on issues of technology, quality assurance/control, and informatics relevant to current effort on the genome project and needs beyond it. Recommendations are presented on areas of the genome program that are of particular interest to and supported by the Department of Energy.

  20. Reviving large-scale projects

    International Nuclear Information System (INIS)

    Desiront, A.

    2003-01-01

    For the past decade, most large-scale hydro development projects in northern Quebec have been put on hold due to land disputes with First Nations. Hydroelectric projects have recently been revived following an agreement signed with Aboriginal communities in the province who recognized the need to find new sources of revenue for future generations. Many Cree are working on the project to harness the waters of the Eastmain River located in the middle of their territory. The work involves building an 890 foot long dam, 30 dikes enclosing a 603 square-km reservoir, a spillway, and a power house with 3 generating units with a total capacity of 480 MW of power for start-up in 2007. The project will require the use of 2,400 workers in total. The Cree Construction and Development Company is working on relations between Quebec's 14,000 Crees and the James Bay Energy Corporation, the subsidiary of Hydro-Quebec which is developing the project. Approximately 10 per cent of the $735-million project has been designated for the environmental component. Inspectors ensure that the project complies fully with environmental protection guidelines. Total development costs for Eastmain-1 are in the order of $2 billion of which $735 million will cover work on site and the remainder will cover generating units, transportation and financial charges. Under the treaty known as the Peace of the Braves, signed in February 2002, the Quebec government and Hydro-Quebec will pay the Cree $70 million annually for 50 years for the right to exploit hydro, mining and forest resources within their territory. The project comes at a time when electricity export volumes to the New England states are down due to growth in Quebec's domestic demand. Hydropower is a renewable and non-polluting source of energy that is one of the most acceptable forms of energy where the Kyoto Protocol is concerned. It was emphasized that large-scale hydro-electric projects are needed to provide sufficient energy to meet both

  1. 24 CFR 8.27 - Occupancy of accessible dwelling units.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Occupancy of accessible dwelling units. 8.27 Section 8.27 Housing and Urban Development Office of the Secretary, Department of Housing... accessible dwelling units. (a) Owners and managers of multifamily housing projects having accessible units...

  2. Summary of the Second Workshop on Liquid Argon Time Projection Chamber Research and Development in the United States

    CERN Document Server

    Acciarri, R; Artrip, D; Baller, B; Bromberg, C; Cavanna, F; Carls, B; Chen, H; Deptuch, G; Epprecht, L; Dharmapalan, R; Foreman, W; Hahn, A; Johnson, M; Jones, B J P; Junk, T; Lang, K; Lockwitz, S; Marchionni, A; Mauger, C; Montanari, C; Mufson, S; Nessi, M; Back, H Olling; Petrillo, G; Pordes, S; Raaf, J; Rebel, B; Sinins, G; Soderberg, M; Spooner, N J C; Stancari, M; Strauss, T; Terao, K; Thorn, C; Tope, T; Toups, M; Urheim, J; Van de Water, R; Wang, H; Wasserman, R; Weber, M; Whittington, D; Yang, T

    2015-01-01

    The second workshop to discuss the development of liquid argon time projection chambers (LArTPCs) in the United States was held at Fermilab on July 8-9, 2014. The workshop was organized under the auspices of the Coordinating Panel for Advanced Detectors, a body that was initiated by the American Physical Society Division of Particles and Fields. All presentations at the workshop were made in six topical plenary sessions: $i)$ Argon Purity and Cryogenics, $ii)$ TPC and High Voltage, $iii)$ Electronics, Data Acquisition and Triggering, $iv)$ Scintillation Light Detection, $v)$ Calibration and Test Beams, and $vi)$ Software. This document summarizes the current efforts in each of these areas. It primarily focuses on the work in the US, but also highlights work done elsewhere in the world.

  3. Light water reactor (LWR) innovation needs in the United States: The Massachusetts Institute of Technology LWR innovation project

    International Nuclear Information System (INIS)

    Golay, M.W.

    1988-01-01

    A major effort under way within the Massachusetts Institute of Technology (MIT) Engineering School is focused on the contributions that technology innovation can make in revitalizing nuclear power in the United States. A principal component of this effort is a project to improve the designs of the next generation of light water reactors (LWRs) with emphasis on achieving improved capacity factors and safety, and reducing the construction duration. The motivation for this overall effort is to prevent the nuclear option from being unnecessarily lost by being available only in uneconomic configurations. In considering how to advance this effort, the authors focused on refining the designs of new reactors because this is the area where the greatest opportunities for improvements exist

  4. Summary of the Second Workshop on Liquid Argon Time Projection Chamber Research and Development in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Acciarri, R. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); et al.

    2015-04-21

    The second workshop to discuss the development of liquid argon time projection chambers (LArTPCs) in the United States was held at Fermilab on July 8-9, 2014. The workshop was organized under the auspices of the Coordinating Panel for Advanced Detectors, a body that was initiated by the American Physical Society Division of Particles and Fields. All presentations at the workshop were made in six topical plenary sessions: i) Argon Purity and Cryogenics, ii) TPC and High Voltage, iii) Electronics, Data Acquisition and Triggering, iv) Scintillation Light Detection, v) Calibration and Test Beams, and vi) Software. This document summarizes the current efforts in each of these areas. It primarily focuses on the work in the US, but also highlights work done elsewhere in the world.

  5. Dixie Valley Bottoming Binary Unit

    Energy Technology Data Exchange (ETDEWEB)

    McDonald, Dale [Terra-Gen Sierra Holdings, LLC, Reno, NV (United States)

    2014-12-21

    This binary plant is the first air cooled, high-output refrigeration based waste heat recovery cycle in the industry. Its working fluid is environmentally friendly and as such, the permits that would be required with a hydrocarbon based cycle are not necessary. The unit is largely modularized, meaning that the unit’s individual skids were assembled in another location and were shipped via truck to the plant site. The Air Cooled Condensers (ACC), equipment piping, and Balance of Plant (BOP) piping were constructed at site. This project further demonstrates the technical feasibility of using low temperature brine for geothermal power utilization. The development of the unit led to the realization of low temperature, high output, and environmentally friendly heat recovery systems through domestic research and engineering. The project generates additional renewable energy, resulting in cleaner air and reduced carbon dioxide emissions. Royalty and tax payments to governmental agencies will increase, resulting in reduced financial pressure on local entities. The major components of the unit were sourced from American companies, resulting in increased economic activity throughout the country.

  6. Development of a project on North Unit Irrigation District’s Main Canal at the Monroe Drop, using a novel low-head hydropower technology called the SLH100

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, Abraham [Natel Energy, Inc., Alameda, CA (United States); Schneider, Gia [Natel Energy, Inc., Alameda, CA (United States); McKinstry, Katherine [Natel Energy, Inc., Alameda, CA (United States); Harwood, Meghan [Natel Energy, Inc., Alameda, CA (United States)

    2017-03-14

    Natel Energy is a low­-head, distributed hydropower company based out of Alameda, CA. Natel manufactures and sells proprietary hydroelectric turbines called hydroEngines® that are suitable for low-­head, high-­flow settings, and range from 30kW to 1 MW of capacity per unit. Natel’s hydroEngine is a state­-of­the-­art two stage impulse turbine, using blades mounted symmetrically on two belts perpendicular to the axis of travel, and using linearly­-moving foils, rather than a rotor, to enable efficient conversion of kinetic energy of large volumes of water at low head with no risk of cavitation. In addition, the hydroEngine can be installed at or above tailwater level, reducing the excavation necessary to build the powerhouse and thus reducing total installed cost and project footprint. Thus, the hydroEngine technology enables a new generation of small hydro installations with low cost of project development, fish-­friendly operations, and small project footprint. In September of 2015, Natel Energy formally commissioned its first project installation in Madras, Oregon, installing 1 SLH100 turbine at an existing drop structure on the North Unit Irrigation District (NUID) Main Canal. The water falls between 13.5 feet to 16.5 feet at this structure, depending on flow. The plant has an installed capacity of 250 kW and an expected annual generation of approximately 873 MWh. The plant operates at an annual capacity factor of 40%, and a capacity factor over the irrigation season, or period of available flow, of 80%. Annual capacity factor is calculated as a percentage of plant operating hours relative to a total of 8,760 hours in a year; because the irrigation canal in which the Project is located only runs water from April to October, the available flow capacity factor is higher. Net greenhouse gas reductions from the Monroe Project are estimated to be 602 tCO2/year. The purpose of this report is to provide an overview of the specifications for Natel’s first

  7. Basic objects of marketing in project activities

    OpenAIRE

    Онищенко, Світлана Петрівна; Берневек, Тетяна Іванівна

    2013-01-01

    The article identified the main types of a project product from the point of view of a business level that is necessary to determine the specificity of the project marketing. As such objects of marketing - variants of the project product we have singled out: a product, a combination "product-market segment," a commodity group, a strategic business unit, a company. We have analyzed the relation "product life cycle - project-organization" and received a generalized representation of this relati...

  8. Factors of human capital related to project success in health care work units.

    Science.gov (United States)

    Suhonen, Marjo; Paasivaara, Leena

    2011-03-01

    To explore factors of human capital related to project success that employees expect from nurse managers. Human capital refers to those resources that managers working with projects possess, such as abilities, knowledge and qualities of character. The data were collected by open interviews (n=14) with nurses, public health nurses and nurse managers working in primary health care and a hospital. Data analysis was carried out using qualitative content analysis. The main factors of human capital related to project success proved to be as follows: (1) management of enthusiastic project culture, (2) management of regeneration and (3) management of emotional intelligence. Future research is needed on the kind of means nurse managers use in human capital management in projects and how they see their possibilities in managing human capital. Human capital management skills should be underlined as an important competence area when recruiting a nurse manager. The success of health care projects cannot be improved only through education or by training of nurse managers; in addition, projects need nurse managers who understand workplace spirituality and have high emotional intelligence. © 2011 The Authors. Journal compilation © 2011 Blackwell Publishing Ltd.

  9. Status and understanding of groundwater quality in the Cascade Range and Modoc Plateau study unit, 2010: California GAMA Priority Basin Project

    Science.gov (United States)

    Fram, Miranda S.; Shelton, Jennifer L.

    2015-01-01

    Groundwater quality in the Cascade Range and Modoc Plateau study unit was investigated as part of the California State Water Resources Control Board’s Groundwater Ambient Monitoring and Assessment (GAMA) Program Priority Basin Project. The study was designed to provide a statistically unbiased assessment of untreated groundwater quality in the primary aquifer system. The depth of the primary aquifer system for the Cascade Range and Modoc Plateau study unit was delineated by the depths of the screened or open intervals of wells in the State of California’s database of public-supply wells. Two types of assessments were made: a status assessment that described the current quality of the groundwater resource, and an understanding assessment that made evaluations of relations between groundwater quality and potential explanatory factors representing characteristics of the primary aquifer system. The assessments characterize the quality of untreated groundwater, not the quality of treated drinking water delivered to consumers by water distributors.

  10. Prevention of Medical Device-Related Pressure Injuries Associated With Respiratory Equipment Use in a Critical Care Unit: A Quality Improvement Project.

    Science.gov (United States)

    Padula, Cynthia A; Paradis, Heidi; Goodwin, Robert; Lynch, Judith; Hegerich-Bartula, Deborah

    Medical devices have been identified as an extrinsic risk factor for development of pressure injuries, with as many as 30% to 70% of medical device-related pressure injuries resulting from respiratory equipment. This article describes a quality improvement project undertaken to reduce the occurrence of respiratory device-related pressure injuries in a critically care unit. Multiple actions were implemented to achieve this goal. Respiratory therapists were trained to document occurrences on a daily basis, and apparent cause analyses were conducted on each occurrence. An interdisciplinary team conducted biweekly rounds on patients with respiratory devices and consulted other professionals as indicated. Nurses and respiratory therapists attended an evidence-based, collaborative, educational offering and completed a measure of team functioning before the program and at the end of the study period. The occurrence rates of respiratory device-related pressure injuries were reduced over the project period, and these changes were sustained over the subsequent 12 months.

  11. Pilot research projects for underground disposal of radioactive wastes in the United States of America

    International Nuclear Information System (INIS)

    Stein, R.; Collyer, P.L.

    1984-01-01

    Disposal of commercial radioactive waste in the United States of America in a deep underground formation will ensure permanent isolation from the biosphere with minimal post-closure surveillance and maintenance. The siting, design and development, performance assessment, operation, licensing, certification and decommissioning of an underground repository have stimulated the development of several pilot research projects throughout the country. These pilot tests and projects, along with their resulting data base, are viewed as important steps in the overall location and construction of a repository. Beginning in the 1960s, research at pilot facilities has progressed from underground spent fuel tests in an abandoned salt mine to the production of vitrified nuclear waste in complex borosilicate glass logs. Simulated underground repository experiments have been performed in the dense basalts of Washington State, the volcanic tuffaceous rock of Nevada and both domal and bedded salts of Louisiana and Kansas. In addition to underground pilot in situ tests, other facilities have been constructed or modified to monitor the performance of spent fuel in dry storage wells and self-shielded concrete casks. As the National Waste Terminal Storage (NWTS) programme advances to the next stage of underground site characterization for each of three different geological sites, additional pilot facilities are under consideration. These include a Test and Evaluation Facility (TEF) for site verification and equipment performance and testing, as well as a salt testing facility for verification of in situ simulation equipment. Although not associated with the NWTS programme, the construction of the Waste Isolation Pilot Plant (WIPP) in the bedded salts of New Mexico is well under way for deep testing and experimentation with the defence programme's transuranic nuclear waste. (author)

  12. Battleground Energy Recovery Project

    Energy Technology Data Exchange (ETDEWEB)

    Bullock, Daniel [USDOE Gulf Coast Clean Energy Application Center, Woodlands, TX (United States)

    2011-12-31

    In October 2009, the project partners began a 36-month effort to develop an innovative, commercial-scale demonstration project incorporating state-of-the-art waste heat recovery technology at Clean Harbors, Inc., a large hazardous waste incinerator site located in Deer Park, Texas. With financial support provided by the U.S. Department of Energy, the Battleground Energy Recovery Project was launched to advance waste heat recovery solutions into the hazardous waste incineration market, an area that has seen little adoption of heat recovery in the United States. The goal of the project was to accelerate the use of energy-efficient, waste heat recovery technology as an alternative means to produce steam for industrial processes. The project had three main engineering and business objectives: Prove Feasibility of Waste Heat Recovery Technology at a Hazardous Waste Incinerator Complex; Provide Low-cost Steam to a Major Polypropylene Plant Using Waste Heat; and Create a Showcase Waste Heat Recovery Demonstration Project.

  13. Project of intercultural education in kindergarten

    OpenAIRE

    Erman, Mojca

    2015-01-01

    Third year students have been performing in winter semester a project called intercultural education in language and ethnically heterogeneous classes. Project was performed in kindergarten Šentvid, unit Sapramiška. The purpose of this project was to raise awareness of children about acceptation or not acceptation of difference, to promote awareness of their own diversity with social games and to strengthen the ethical judgment using an inductive approach (Kroflič, 2007). I have followed and e...

  14. Evaluation of nuclear facility decommissioning projects. Status report. Humboldt Bay Power Plant Unit 3, SAFSTOR decommissioning

    International Nuclear Information System (INIS)

    Baumann, B.L.; Haffner, D.R.; Miller, R.L.; Scotti, K.S.

    1986-06-01

    This document explains the purpose of the US Nuclear Regulatory Commission's (NRC) Evaluation of Nuclear Facility Decommissioning Projects (ENFDP) program and summarizes information concerning the decommissioning of the Humboldt Bay Power Plant (HBPP) Unit 3 facility. Preparations to put this facility into a custodial safe storage (SAFSTOR) mode are currently scheduled for completion by June 30, 1986. This report gives the status of activities as of June 1985. A final summary report will be issued after completion of this SAFSTOR decommissioning activity. Information included in this status report has been collected from the facility decommissioning plan, environmental report, and other sources made available by the licensee. This data has been placed in a computerized data base system which permits data manipulation and summarization. A description of the computer reports that can be generated by the decommissioning data system (DDS) for Humboldt Bay and samples of those reports are included in this document

  15. METRIC context unit architecture

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, R.O.

    1988-01-01

    METRIC is an architecture for a simple but powerful Reduced Instruction Set Computer (RISC). Its speed comes from the simultaneous processing of several instruction streams, with instructions from the various streams being dispatched into METRIC's execution pipeline as they become available for execution. The pipeline is thus kept full, with a mix of instructions for several contexts in execution at the same time. True parallel programming is supported within a single execution unit, the METRIC Context Unit. METRIC's architecture provides for expansion through the addition of multiple Context Units and of specialized Functional Units. The architecture thus spans a range of size and performance from a single-chip microcomputer up through large and powerful multiprocessors. This research concentrates on the specification of the METRIC Context Unit at the architectural level. Performance tradeoffs made during METRIC's design are discussed, and projections of METRIC's performance are made based on simulation studies.

  16. Lessons learnt from Ignalina NPP decommissioning project

    International Nuclear Information System (INIS)

    NAISSE, Jean-Claude

    2007-01-01

    The Ignalina Nuclear Power Plant (INPP) is located in Lithuania, 130 km north of Vilnius, and consists of two 1500 MWe RBMK type units, commissioned respectively in December 1983 and August 1987. On the 1. of May 2004, the Republic of Lithuania became a member of the European Union. With the protocol on the Ignalina Nuclear Power in Lithuania which is annexed to the Accession Treaty, the Contracting Parties have agreed: - On Lithuanian side, to commit closure of unit 1 of INPP before 2005 and of Unit 2 by 31 December 2009; - On European Union side, to provide adequate additional Community assistance to the efforts of Lithuania to decommission INPP. The paper is divided in two parts. The first part describes how, starting from this agreement, the project was launched and organized, what is its present status and which activities are planned to reach the final ambitious objective of a green field. To give a global picture, the content of the different projects that were defined and the licensing process will also be presented. In the second part, the paper will focus on the lessons learnt. It will explain the difficulties encountered to define the decommissioning strategy, considering both immediate or differed dismantling options and why the first option was finally selected. The paper will mention other challenges and problems that the different actors of the project faced and how they were managed and solved. The paper will be written by representatives of the Ignalina NPP and of the Project Management Unit. (author)

  17. The Impact of Student-Directed Projects in Introductory Statistics

    Science.gov (United States)

    Spence, Dianna J.; Bailey, Brad; Sharp, Julia L.

    2017-01-01

    A multi-year study investigated the impact of incorporating student-directed discovery projects into introductory statistics courses. Pilot instructors at institutions across the United States taught statistics implementing student-directed projects with the help of a common set of instructional materials designed to facilitate such projects.…

  18. SOLERAS - Solar Controlled Environment Agriculture Project. Final report, Volume 1. Project summary

    Energy Technology Data Exchange (ETDEWEB)

    1985-12-30

    A summary of the Solar Controlled Environment Agriculture Project is presented. The design of the greenhouses include transparent double pane glass roof with channels for fluid between the panes, inner pane tinted and double pane extruded acrylic aluminized mylar shade and diffuser. Solar energy technologies provide power for water desalination, for pumping irrigation water, and for cooling and heating the controlled environment space so that crops can grow in arid lands. The project is a joint effort between the United States and Saudi Arabia. (BCS)

  19. Modernization project of the rod control system and in-core instrumentation system for 34 units of the 900 MW French EDF fleet

    International Nuclear Information System (INIS)

    Tavolara, Ivan; Verburgh, Pierre; Menager, Antoine

    2010-01-01

    Rolls-Royce and Cegelec, in partnership, carry out a unique and considerable modernisation project of two Instrumentation and Control (I and C) systems for the entire 900 MWe fleet of Electricite De France (EDF). Both rod control (RCS) and reactor in-core measurement (RIC) systems are to be modernised in the frame of the third ten-year renovation of all 34 reactor units over 9 power plants. The RCS contributes to the control of nuclear power by actuating control rod drive mechanisms that allow insertion or withdrawal of control rods. The RCS has also monitoring functions such as controlling the actual rods' position as well as the functional consistency between commands and actual positions. The RIC system measures in-core neutron flux, providing useful information to the control room as well as to the reactor unit computer for further processing. The renovated systems shall replace the existing ageing analog technology by modern digital technology based on PLC (Programmable Logic Controllers) and FPGA (Field-Programmable Gate Array) in the case of power subassemblies of RCS. Both systems rely for certain functions on a common network linking the RCS and RIC networks, improving operations and maintenance thanks to a powerful Man Machine Interface at the different locations of the systems with an extensive suite of tools and diagnostic menus. The project whose design phase started in July 2006 is now in its deployment phase after the successful site implementation of both systems at the first units of Tricastin and Fessenheim power plants, respectively in August 2009 and February 2010. The deployment shall continue with the other 32 units until 2020. Rolls-Royce has a broad range of civil nuclear expertise, including work related to licensing and safety reviews, engineering design, supply chain management, manufacturing, installation and commissioning of the nuclear island systems and equipment, as well as operational management through life support. Cegelec, with

  20. The impact of a noise reduction quality improvement project upon sound levels in the open-unit-design neonatal intensive care unit.

    Science.gov (United States)

    Liu, W F

    2010-07-01

    To decrease measured sound levels in the neonatal intensive care unit through implementation of human factor and minor design modification strategies. Prospective time series. Two open-unit-design neonatal centers. Implementation of a coordinated program of noise reduction strategies did not result in any measurable improvement in levels of loudness or quiet. Two centers, using primarily human behavior noise reduction strategies, were unable to demonstrate measurable improvements in sound levels within the occupied open-unit-design neonatal intensive care unit.

  1. Time-constrained project scheduling with adjacent resources

    NARCIS (Netherlands)

    Hurink, Johann L.; Kok, A.L.; Paulus, J.J.; Schutten, Johannes M.J.

    We develop a decomposition method for the Time-Constrained Project Scheduling Problem (TCPSP) with adjacent resources. For adjacent resources the resource units are ordered and the units assigned to a job have to be adjacent. On top of that, adjacent resources are not required by single jobs, but by

  2. Time-constrained project scheduling with adjacent resources

    NARCIS (Netherlands)

    Hurink, Johann L.; Kok, A.L.; Paulus, J.J.; Schutten, Johannes M.J.

    2008-01-01

    We develop a decomposition method for the Time-Constrained Project Scheduling Problem (TCPSP) with Adjacent Resources. For adjacent resources the resource units are ordered and the units assigned to a job have to be adjacent. On top of that, adjacent resources are not required by single jobs, but by

  3. Unit 1203: The Social and Psychological Implications of Language.

    Science.gov (United States)

    Minnesota Univ., Minneapolis. Center for Curriculum Development in English.

    Designed as a synthesis of concepts familiar to students having studied the earlier Minnesota Project English units or as an introduction for other students, this unit for grade 12 treats the role of language in the social and psychological development of man. Alternative introductions to the unit are provided: one concentrating on definitions of…

  4. Plastic surgery: quo vadis? Current trends and future projections of aesthetic plastic surgical procedures in the United States.

    Science.gov (United States)

    Broer, P Niclas; Levine, Steven M; Juran, Sabrina

    2014-03-01

    The objective of this article was to evaluate past and current trends regarding aesthetic operations in the United States and to project future changes regarding such procedures. Cosmetic surgery statistics from the American Society for Aesthetic Plastic Surgery from 1997 to 2012 were analyzed by sex, age, and ethnic group. Then, using population projections from the U.S. Census Bureau based on the 2010 census, two projection scenarios of the expected number of aesthetic plastic surgery procedures were generated. The scenarios included the presumed occurrence and nonoccurrence of a recession like that which occurred in 2007. Aesthetic procedures are expected to grow from 1,688,694 in 2012 to 3,847,929 by 2030, representing an average annual growth rate of 7.1 percent. Should another recession of similar degree to the one in 2007 occur, procedures would increase to only 2,086,994, displaying an average annual growth percentage rate of 1.3 percent. Because the age distribution of the patient population will change, preferences for specific procedures according to age influence-and thus are reflected in-future demand for those procedures. Furthermore, the ethnic profile of patients will change significantly, with 32 percent of all procedures being performed on patients other than Caucasians by 2030. Demand for aesthetic plastic surgical procedures is expected to continue to grow, while depending on the economic performance at the macro level and changing demographic dynamics of the U.S. population. Considering all investigated factors and trends among all patients, the most commonly requested procedures by 2030 are likely to be (1) breast augmentations, (2) lipoplasties, and (3) blepharoplasties.

  5. Heavy Metals Contaminated Soil Project, Resource Recovery Project, and Dynamic Underground Stripping Project

    International Nuclear Information System (INIS)

    1994-02-01

    The Department of Energy (DOE) established the Office of Technology Development (EM-50) (OTD) as an element of Environmental Restoration and Waste Management (EM) in November, 1989. OTD has begun to search out, develop, test and demonstrate technologies that can now or in the future be applied to the enormous remediation problem now facing the DOE and the United States public in general. Technology demonstration projects have been designed to attack a separate problem as defined by DOE. The Heavy Metals Contaminated Soil Project was conceived to test and demonstrate off-the-shelf technologies (dominantly from the mining industry) that can be brought to bear on the problem of radionuclide and heavy metal contamination in soils and sediments. The Resource Recovery Project is tasked with identifying, developing, testing, and evaluating new and innovative technologies for the remediation of metal contaminated surface and groundwater. An innovative twist on this project is the stated goal of recovering the metals, formerly disposed of as a waste, for reuse and resale, thereby transforming them into a usable resource. Finally, the Dynamic Underground Stripping Project was developed to demonstrate and remediate underground spills of hydrocarbons from formations that are (1) too deep for excavation, and/or (2) require in-situ remediation efforts of long duration. This project has already been shown effective in reducing the time for remediation by conventional methods from an estimated 200 years at the Lawrence Livermore National Laboratory (LLNL) to less than one year. The savings in time and dollars from this technology alone can be immeasurable

  6. ASEAN projects reviewed.

    Science.gov (United States)

    1980-01-01

    The ASEAN Population Expert Group met in Manila and was followed by a meeting of the ASEAN heads of population programs, during the period November 5-10, 1979. Heads of population programs from Indonesia, Malaysia, Singapore, Thailand, and the Philippines attended. The meetings were held to review progress-to-date on phase 1 projects and to consider the development of an expanded population program. 5 projects funded by UNFPA are reviewed in tabular form with the project, the sponsoring country, date of implementation, data analysis, and date of completion. Suggestions were made for improving and extending these projects and it was also suggested that all projects being developed and proposed should include a section on use of research. 7 new projects were proposed as phase 2 projects. The 1st, sponsored by Malaysia, deals with women in development; project 2, lead by Thailand, will investigate population movement and its effect on development; project 3, led by the Philippines, will develop and strengthen national population information systems and networks in ASEAN countries; project 4, led by Indonesia, is directed towards institutional development and exchanges of personnel; project 5, led by the Philippines, will examine population and development dynamics and the man/resources balance; project 6, led by Thailand, will develop ASEAN social indicators; and project 7, led by Indonesia and Malaysia, will make a comprehensive analysis of existing medical/health care and family planning systems. It was recommended that an executive director of the proposed ASEAN population coordination unit should be appointed to expedite the recommendations of the meeting related to preparation and submission of phase 2 project proposals.

  7. Unit: Plants, Inspection Pack, National Trial Print.

    Science.gov (United States)

    Australian Science Education Project, Toorak, Victoria.

    This is a National Trial Print of a unit on plants produced as a part of the Australian Science Education Project. The unit consists of an information booklet for students, a booklet for recording student data, and a teacher's guide. The material, designed for use with students in the upper elementary grades, takes from 15 to 20 forty-minute…

  8. Use of Multi-Disciplinary Projects To Develop Competence.

    Science.gov (United States)

    Trotman-Dickenson, Danusia

    1992-01-01

    Undergraduate technology and business students at the Polytechnic of Wales (United Kingdom) participated in multi-disciplinary team projects to experience real life business challenges and develop competences that employers expect in professionals. Lists characteristics of successful multi-disciplinary projects, discusses cost and industry…

  9. Improving patient care through student leadership in team quality improvement projects.

    Science.gov (United States)

    Tschannen, Dana; Aebersold, Michelle; Kocan, Mary Jo; Lundy, Francene; Potempa, Kathleen

    2015-01-01

    In partnership with a major medical center, senior-level nursing students completed a root cause analysis and implementation plan to address a unit-specific quality issue. To evaluate the project, unit leaders were asked their perceptions of the value of the projects and impact on patient care, as well as to provide exemplars depicting how the student root cause analysis work resulted in improved patient outcome and/or unit processes. Liaisons noted benefits of having an RCA team, with positive impact on patient outcomes and care processes.

  10. Final rapid reactivation project environmental assessment

    International Nuclear Information System (INIS)

    1999-01-01

    The US Department of Energy (DOE) has prepared an environmental assessment (EA) for the Rapid Reactivation Project at Sandia National Laboratories, New Mexico. The EA analyzes the potential effects of a proposal to increase production of neutron generators from the current capability of 600 units per year up to 2,000 units per year. The project would use existing buildings and infrastructure to the maximum extent possible to meet the additional production needs. The increased production levels would necessitate modifications and additions involving a total area of approximately 26,290 gross square feet at Sandia National Laboratories, New Mexico, Technical Area 1. Additional production equipment would be procured and installed. The no-action alternative would be to continue production activities at the current capability of 600 units per year. The EA analyzes effects on health, safety, and air quality, resulting from construction and operation and associated cumulative effects. A detailed description of the proposed action and its environmental consequences is presented in the EA

  11. Atomic power project, Kakrapar, Gujarat

    International Nuclear Information System (INIS)

    Varadarajan, G.

    1992-01-01

    The atomic power project at Kakrapar, comprising of two units of 235 MW each, went critical very recently in September 1992. The work consisted of construction of reactor and turbine buildings, outer and inner containment walls, calandria vault, natural draught cooling tower, etc. Nearly 152,000m 3 of normal aggregate concrete and 3,500m 3 of heavy aggregate concrete were produced and poured. The paper describes salient innovative construction features of the project. Incidentally, the project received a Certificate of Merit in the Excellence in Concrete competition held by the Maharashtra India Chapter of the American Concrete Institute. (author). 7 figs

  12. Development of Water Quality Modeling in the United States

    Science.gov (United States)

    This presentation describes historical trends in water quality model development in the United States, reviews current efforts, and projects promising future directions. Water quality modeling has a relatively long history in the United States. While its origins lie in the work...

  13. Impact of online toxicology training on health professionals: the Global Educational Toxicology Uniting Project (GETUP).

    Science.gov (United States)

    Wong, Anselm; Vohra, Rais; Dawson, Andrew H; Stolbach, Andrew

    2017-11-01

    The Global Educational Toxicology Uniting Project (GETUP), supported by the American College of Medical Toxicology, links countries with and without toxicology services via distance education with the aim to improve education. Due to the lack of toxicology services in some countries there is a knowledge gap in the management of poisonings. We describe our experience with the worldwide delivery of an online introductory toxicology curriculum to emergency doctors and other health professionals treating poisoned patients. We delivered a 15-module introductory Internet-based toxicology curriculum to emergency doctors and health professionals, conducted from August to December 2016. This Internet-based curriculum was adapted from one used to teach emergency residents toxicology in the United States. Modules covered themes such as pharmaceutical (n = 8), toxidromes (n = 2) and agrochemicals (n = 5) poisoning. Participants completed pre-test and post-test multiple choice questions (MCQs) before and after completing the online module, respectively, throughout the course. We collected information on participant demographics, education and training, and perception of relevance of the curriculum. Participants gave feedback on the course and how it affected their practice. One hundred and thirty-six health professionals from 33 countries participated in the course: 98 emergency doctors/medical officers, 25 physicians, eight pharmacists/poisons information specialists, two toxicologists, two medical students and one nurse. Median age of participants was 34 years. Median number of years postgraduate was seven. Ninety (65%) had access to either a poisons information centre over the phone or toxicologist and 48 (35%) did not. All participants expected the course to help improve their knowledge. Overall median pre-module MCQ scores were 56% (95%CI: 38, 75%) compared to post-module MCQ scores median 89% (95% CI: 67, 100%) (p education to health professionals treating

  14. Cernovoda construction on target for Unit 1 startup in 1994

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    AECL and the Italian company Ansaldo have formed a joint venture to complete the first unit of the five-unit station at Cernovoda, with AECL assuming overall project management. Financing of the project is being provided jointly, with $315 million form the Canadian Export Development Corp. and $175 million from the Italian government. First criticality is scheduled for October 1994, and connection to the grid in December 1994. When complete, Cernovoda will supply 30% of Romania's electricity

  15. Technical Specifications, South Texas Project, Unit Nos. 1 and 2 (Docket Nos. 50-498 and 50-499): Appendix ''A'' to License Nos. NPF-76 and NPF-80

    International Nuclear Information System (INIS)

    1989-03-01

    The South Texas Project, Unit Nos. 1 and 2, Technical Specifications were prepared by the US Nuclear Regulatory Commission to set forth the limits, operating conditions, and other requirements applicable to a nuclear reactor facility as set forth in Section 50.36 of 10 CFR Part 50 for the protection of the health and safety of the public

  16. Technical specifications, South Texas Project, Unit Nos. 1 and 2 (Docket Nos. 50-498 and 50-499): Appendix ''A'' to License Nos. NPF-76 and NPF-78

    International Nuclear Information System (INIS)

    1989-01-01

    The South Texas Project, Unit Nos. 1 and 2, Technical Specifications were prepared by the US Nuclear Regulatory Commission to set forth the limits, operating conditions, and other requirements applicable to a nuclear reactor facility as set forth in Section 50.36 of 10 CFR Part 50 for the protection of the health and safety of the public

  17. Conceptual aspects of the safety evaluation of a project of complementary spent nuclear fuel dry storage unit

    Energy Technology Data Exchange (ETDEWEB)

    Freitas, Rafaela da S. A.; Fontes, Gladson S., E-mail: rafaaelaandrade@hotmail.com, E-mail: gsfontes@hotmail.com [Instituto Militar de Engenharia (IME), Rio de Janeiro, RJ (Brazil); Saldanha, Pedro L. C., E-mail: saldanha@cnen.gov.br [Comissão Nacional de Energia Nuclear (CNEN), Rio de Janeiro, RJ (Brazil)

    2017-07-01

    Based on the number of cycles and the amount of new fuel elements exchanged in the reactor cores at each cycle, the forecast for the exhaustion of the spent nuclear fuel pools of the Brazil plants has provision until 2021. As are still in the studies the availability of a long-term storage facility for spent fuel, the short-term solution will be the construction of the Complementary Storage Spent Nuclear Fuel Unit, it will build inside the site in Angra Plants. The dry cask is a method of storage in which the fuel elements of high-level radioactive waste are stored, such as spent nuclear fuel, which already cooled in the fuel pool for at least one year and up to ten years. The purpose of the present paper is to discuss a conceptual study of the safety analysis of a project of licensing of a Dry Storage Unit (DSU) with the objective of verifying the application of national and international criteria, requirements and standards. The safety analysis will make on the principles adopted by the US Nuclear USNRC and the standards adopted at CNEN for dry storage. The concept of installation, seismic, geological and other analysis will be approached for approval of the site to be installed at DSU, the approved permit for the construction and finally the external and internal events that may occur being incidents and / or accidents and which are The necessary mitigations if something occurs within a period of time. (author)

  18. Conceptual aspects of the safety evaluation of a project of complementary spent nuclear fuel dry storage unit

    International Nuclear Information System (INIS)

    Freitas, Rafaela da S. A.; Fontes, Gladson S.; Saldanha, Pedro L. C.

    2017-01-01

    Based on the number of cycles and the amount of new fuel elements exchanged in the reactor cores at each cycle, the forecast for the exhaustion of the spent nuclear fuel pools of the Brazil plants has provision until 2021. As are still in the studies the availability of a long-term storage facility for spent fuel, the short-term solution will be the construction of the Complementary Storage Spent Nuclear Fuel Unit, it will build inside the site in Angra Plants. The dry cask is a method of storage in which the fuel elements of high-level radioactive waste are stored, such as spent nuclear fuel, which already cooled in the fuel pool for at least one year and up to ten years. The purpose of the present paper is to discuss a conceptual study of the safety analysis of a project of licensing of a Dry Storage Unit (DSU) with the objective of verifying the application of national and international criteria, requirements and standards. The safety analysis will make on the principles adopted by the US Nuclear USNRC and the standards adopted at CNEN for dry storage. The concept of installation, seismic, geological and other analysis will be approached for approval of the site to be installed at DSU, the approved permit for the construction and finally the external and internal events that may occur being incidents and / or accidents and which are The necessary mitigations if something occurs within a period of time. (author)

  19. United States Interagency Elevation Inventory (USIEI)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The U.S. Interagency Elevation Inventory displays high-accuracy topographic and bathymetric data for the United States and its territories. The project is a...

  20. Organic Rankine cycle unit for waste heat recovery on ships (PilotORC)

    DEFF Research Database (Denmark)

    Haglind, Fredrik; Montagud, Maria E. Mondejar; Andreasen, Jesper Graa

    The project PilotORC was aimed at evaluating the technical and economic feasibility of the use of organic Rankine cycle (ORC) units to recover low-temperature waste heat sources (i.e. exhaust gases, scavenge air, engine cooling system, and lubricant oil system) on container vessels. The project...... included numerical simulations and experimental tests on a 125 kW demonstration ORC unit that utilizes the waste heat of the main engine cooling system on board one of Mærsk's container vessels. During the design of the demonstration ORC unit, different alternatives for the condenser were analyzed in order...... of using ORC units for maritime applications, and the relevance of this technology for new-building projects. Firstly, an evaluation of the waste heat resources available on board Mærsk containers fleet, and an estimation of the potential energy recovery by means of the ORC technology was performed...

  1. Assesing the acceptance of the project

    Directory of Open Access Journals (Sweden)

    Clara Fernández-Shaw Toda

    2009-11-01

    Full Text Available OBJECTIVE: Evaluate the acceptability of the project "Adding colour to your unit dose." MATERIAL AND METHODS: It sets in motion a project to reduce errors in the administration of pasting labels with different shapes and colours on blister medicines. It includes the name of the product, the active ingredient, dosage, lot and expiration date. Also included for internal quality control are the initials of the person who made the label and the date and time at which it was made. The nurse monitors the consistency between the data and the label of the drug. After 4 years the external acceptance of the project is analyzed through a satisfaction survey administered to the professionals involved in prescribing and dispensing medicines. RESULTS: 100% of the physicians believed that the project is adequate. Assistants and nurses expressed a dissatisfaction of 58.3% and 26.66% respectively due to the difficulty of extracting the specialty. CONCLUSIONS: - There is agreement on the need to clearly differentiate drugs, which traditional packaging does not resolve while “Adding colour to your unit dose" does. - The pharmacy prepared labels with a flap to facilitate their opening, thereby improving the current system.

  2. Health promotion in Local Health Unit 4 Chiavarese--Liguria Region, Italy. "Unplugged" project: needs, methodology and implementation.

    Science.gov (United States)

    Carpi, A; Ferrari Bravo, M; Poggi, L; Chiesa, S; Costa, A; De Leo, A; Rebolini, G; Gabutti, G

    2015-12-01

    The aim of this paper was to use and evaluate the unplugged project, a school-based program of proven effectiveness aimed at the prevention of substance abuse based on social influence. This project was conducted during the school-year 2011/2012; it involved the Local Health Unit (LHU)'s personnel specifically and adequately formed and was addressed to teachers working in the three districts of the LHU4 Chiavarese. The courses involved teachers in three consecutive days and provided both theoretical inputs and practical exercises designed to enpower skills and to make the same effective. As a whole, 25 teachers of the secondary schools (public and private) of first and second level were trained. Following the training, 14 curricular courses have been launched and 286 students have been involved. The teachers have mainly worked on personal and social components of their students, stimulating their critical assessment of standards and skills potentially transferable in everyday life. The benefits for students have been: establishment of the classroom, positive relationship with the teacher, empathy, decrease of conflicts, increased self-awareness and self-esteem, better school results. Besides, teachers benefit from increased respect, self-reliance and confidence, as well as acquisition of new skills. Both the interest shown by teachers and the results achieved in classrooms have stimulated school leadership and personnel belonging to LHU4 Chiavarese to plan a new edition of the program the next autumn.

  3. Improving Family Meetings in Intensive Care Units: A Quality Improvement Curriculum.

    Science.gov (United States)

    Gruenewald, David A; Gabriel, Michelle; Rizzo, Dorothy; Luhrs, Carol A

    2017-07-01

    Family meetings in the intensive care unit are associated with beneficial outcomes for patients, their families, and health care systems, yet these meetings often do not occur in a timely, effective, reliable way. The Department of Veterans Affairs Comprehensive End-of-Life Care Implementation Center sponsored a national initiative to improve family meetings in Veterans Affairs intensive care units across the United States. Process measures of success for the initiative were identified, including development of a curriculum to support facility-based quality improvement projects to implement high-quality family meetings. Identified curriculum requirements included suitability for distance learning and applicability to many clinical intensive care units. Curriculum modules were cross-mapped to the "Plan-Do-Study-Act" model to aid in planning quality improvement projects. A questionnaire was e-mailed to users to evaluate the curriculum's effectiveness. Users rated the curriculum's effectiveness in supporting and achieving aims of the initiative as 3.6 on a scale of 0 (not effective) to 4 (very effective). Users adapted the curriculum to meet local needs. The number of users increased from 6 to 17 quality improvement teams in 2 years. All but 3 teams progressed to implementation of an action plan. Users were satisfied with the effectiveness and adaptability of a family-meeting quality improvement curriculum to support implementation of a quality improvement project in Veterans Affairs intensive care units. This tool may be useful in facilitating projects to improve the quality of family meetings in other intensive care units. ©2017 American Association of Critical-Care Nurses.

  4. International boundary experiences by the United Nations

    Science.gov (United States)

    Kagawa, A.

    2013-12-01

    Over the last few decades, the United Nations (UN) has been approached by Security Council and Member States on international boundary issues. The United Nations regards the adequate delimitation and demarcation of international boundaries as a very important element for the maintenance of peace and security in fragile post-conflict situations, establishment of friendly relationships and cross-border cooperation between States. This paper will present the main principles and framework the United Nations applies to support the process of international boundary delimitation and demarcation activities. The United Nations is involved in international boundary issues following the principle of impartiality and neutrality and its role as mediator. Since international boundary issues are multi-faceted, a range of expertise is required and the United Nations Secretariat is in a good position to provide diverse expertise within the multiple departments. Expertise in different departments ranging from legal, political, technical, administrative and logistical are mobilised in different ways to provide support to Member States depending on their specific needs. This presentation aims to highlight some of the international boundary projects that the United Nations Cartographic Section has been involved in order to provide the technical support to different boundary requirements as each international boundary issue requires specific focus and attention whether it be in preparation, delimitation, demarcation or management. Increasingly, the United Nations is leveraging geospatial technology to facilitate boundary delimitation and demarcation process between Member States. Through the presentation of the various case studies ranging from Iraq - Kuwait, Israel - Lebanon (Blue Line), Eritrea - Ethiopia, Cyprus (Green Line), Cameroon - Nigeria, Sudan - South Sudan, it will illustrate how geospatial technology is increasingly used to carry out the support. In having applied a range

  5. Safety Evaluation Report related to the operation of South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499)

    International Nuclear Information System (INIS)

    1988-03-01

    In April 1986 the staff of the US Nuclear Regulartory Commission issued its Safety Evaluation Report (NURED-0781) regarding the application of Houston Lighting and Power Companany (applicant and agent for the owners) for a license to operate South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499). The facililty is located in Matagorda County, Texas, west of the Colorado River, 8 miles north-northwest of the town of Matagorda and about 89 miles southwest of Houston. The first supplement to NUREG-0781 was issued in September 1986, the second supplement in January 1987, the third supplement in May 1987, and the fourth supplement in July 1987. This fifth supplement provides updated information on the issues that had been considered previously as well as the evaluation of issues that have arisen since the fourth supplement was issued. The evaluation resolves all the issues necessary to support the issuance of a full-power license for Unit 1

  6. Point Lepreau nuclear project unlocks power future of New Brunswick

    Energy Technology Data Exchange (ETDEWEB)

    Burgess, E J [New Brunswick Electric Power Commission, Fredericton (Canada)

    1976-08-01

    Projects under development will increase the generating capacity of New Brunswick Electric Power Commission from 1.47 to 3.14 GW. Of these projects, the most significant is the 0.63 GW Point Lepreau CANDU reactor. Progress in the construction of the power reactor is summarized. The concrete reactor building was slipformed in April 1976. A second nuclear unit at Point Lepreau is being considered. Information is also provided on the new oil-fired station at Coleson Cove, a new oil- or coal-fired unit at Dalhousie and further hydro units at Mactaquac. A 0.16 GW pumped storage hydro unit at Green River is being considered. Information on transmission (Including the HVDC system), substations, and connection with Hydro Quebec is included.

  7. Improvement of Oil-Vapor Treatment Facility for Wolsong Unit 3,4

    International Nuclear Information System (INIS)

    Kim, Jeong Guk; Kwon, S. W.; Lee, H. S.

    2009-11-01

    With the purpose to minimize an oil-vapor discharge to the atmosphere and to be an environmentally friendly nuclear power plant by an improvement of mist eliminator for turbine lubricant system at Wolsong Nuclear Power Plant Unit 3,4, this project - project name : Improvement of Oil-vapor Treatment Facility for Wolsong Unit 3,4 - was conducted for six months (from Apr. 15, 2009 to Oct. 14, 2009). This Project contains Oil-vapor Source and Environmental Regulation, Analysis on the Present Oil-vapor Treatment Facility, Improvement of Oil-vapor Treatment Facility, Test Facility Design, Fabrication, Installation, Test Operation, Evaluation of the Facility

  8. Chinese Dragons in an American Science Unit

    Science.gov (United States)

    Lew, Lee Yuen; McLure, John W.

    2005-01-01

    Can art and science find a happy home in the same unit? We think the answer is yes, if the central problem interests the students and allows them to try out multiple abilities. The sixth-grade unit described in this article, which we called "The Dragon Project," grew mainly from two roots, a study of ancient China and a later probe into…

  9. TESLA project goes public

    International Nuclear Information System (INIS)

    Flegel', I.

    2002-01-01

    The TESLA project connected with the creation of superconducting linear accelerator with colliding neutron and positron beams in the DESY Laboratory (Hamburg) is presented. Scientists of 36 countries make a contribution in the Feasibility study of new accelerator construction. Creation of new accelerator will open the way to the investigation into new elementary particles; TESLA is perfectly suitable for the production of Higgs particles. Exact measurements on the unit will allow to research into properties of supersymmetrical particles. The TESLA project involves the creation of X-ray free electron laser [ru

  10. Status and understanding of groundwater quality in the two southern San Joaquin Valley study units, 2005-2006 - California GAMA Priority Basin Project

    Science.gov (United States)

    Burton, Carmen A.; Shelton, Jennifer L.; Belitz, Kenneth

    2012-01-01

    Groundwater quality in the southern San Joaquin Valley was investigated from October 2005 through March 2006 as part of the Priority Basin Project of the Groundwater Ambient Monitoring and Assessment (GAMA) Program. The GAMA Priority Basin Project is conducted by the U.S. Geological Survey (USGS) in collaboration with the California State Water Resources Control Board and the Lawrence Livermore National Laboratory. There are two study units located in the southern San Joaquin Valley: the Southeast San Joaquin Valley (SESJ) study unit and the Kern County Subbasin (KERN) study unit. The GAMA Priority Basin Project in the SESJ and KERN study units was designed to provide a statistically unbiased, spatially distributed assessment of untreated groundwater quality within the primary aquifers. The status assessment is based on water-quality and ancillary data collected in 2005 and 2006 by the USGS from 130 wells on a spatially distributed grid, and water-quality data from the California Department of Public Health (CDPH) database. Data was collected from an additional 19 wells for the understanding assessment. The aquifer systems (hereinafter referred to as primary aquifers) were defined as that part of the aquifer corresponding to the perforation interval of wells listed in the CDPH database for the SESJ and KERN study units. The status assessment of groundwater quality used data from samples analyzed for anthropogenic constituents such as volatile organic compounds (VOCs) and pesticides, as well as naturally occurring inorganic constituents such as major ions and trace elements. The status assessment is intended to characterize the quality of untreated groundwater resources within the primary aquifers in the SESJ and KERN study units, not the quality of drinking water delivered to consumers. Although the status assessment applies to untreated groundwater, Federal and California regulatory and non-regulatory water-quality benchmarks that apply to drinking water are used

  11. Operationalizing CSR through Project Conception

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    2013-01-01

    The purpose of this paper is to address issues raised about the content of business education—moving away from a business-centered approach to understanding management, opening up a space for reflection, and offering tools to support this change in paradigm. Strand points out these issues as “rel...... of project conception by management can be understood as the place where CSR and sustainability practices can be operationalized in the base unit of work for many corporations—the project....... as “relevancy, reflexivity and continuity.” (Strand, 2011, p.41). Although Project Management (PM) is often understood as a specialized and narrow management topic, in organizations that use formalized and integrated PM practices such as Prince2 ™, management is responsible for project conception. The practice...

  12. Science Roles and Interactions in Adaptive Management of Large River Restoration Projects, Midwest United States

    Science.gov (United States)

    Jacobson, R. B.; Galat, D. L.; Smith, C. B.

    2010-12-01

    Most large-river restoration projects include formal or informal implementations of adaptive management strategies which acknowledge uncertainty and use scientific inquiry to learn and refine management options. Although the central role of science in reducing uncertainty is acknowledged in such projects, specific roles and interactions can vary widely, including how science relates to decision-making within the governance of these projects. Our objective is to present some structured generalizations about science roles and interactions as developed from the authors’ experiences in adaptive management of large river restoration in the Midwest United States. Scientific information may be introduced into decision making by scientists acting in any of the three roles common to adaptive management -- action agency representative, stakeholder, or science provider. We have observed that confusion and gridlock can arise when it is unclear if a scientist is acting as an advocate for a stakeholder or management position, or instead as an independent, “honest broker” of science. Although both advocacy and independence are proper and expected in public decision making, it is useful when scientists unambiguously identify their role. While complete scientific independence may be illusory, transparency and peer review can promote the ideal. Transparency comes from setting clear directions and objectives at the decision-making level and defining at the outset how learning will help assess progress and inform decisions. Independent peer reviews of proposals, study plans, and publications serve as a powerful tool to advance scientific independence, even if funding sources present a potential conflict of interest. Selection of experts for scientific advice and review often requires consideration of the balance between benefits of the “outside” expert (independent, knowledgeable but with little specific understanding of the river system), compared to those provided by the

  13. Water Quality Monitoring: An Environmental Studies Unit for Biology 20/30. Teacher's Guide.

    Science.gov (United States)

    Alberta Environment, Edmonton. Environmental Education Resources Branch.

    The objective of this environmental studies unit is to establish a water quality monitoring project for high school students in Alberta while simultaneously providing a unit which meets the objectives of the Biology 20 program (and which may also be used in Biology 10 and 30). Through this project, students assist in the collection,…

  14. Water Quality Monitoring: An Environmental Studies Unit for Biology 20/30. Student Manual.

    Science.gov (United States)

    Alberta Environment, Edmonton. Environmental Education Resources Branch.

    The objective of this environmental studies unit is to establish a water quality monitoring project for high school students in Alberta while simultaneously providing a unit which meets the objectives of the Biology 20 program (and which may also be used in Biology 10 and 30). Through this project, students assist in the collection,…

  15. Continuous fields of land cover for the conterminous United States using Landsat data: First results from the Web-Enabled Landsat Data (WELD) project

    Science.gov (United States)

    Hansen, M.C.; Egorov, Alexey; Roy, David P.; Potapov, P.; Ju, J.; Turubanova, S.; Kommareddy, I.; Loveland, Thomas R.

    2011-01-01

    Vegetation Continuous Field (VCF) layers of 30 m percent tree cover, bare ground, other vegetation and probability of water were derived for the conterminous United States (CONUS) using Landsat 7 Enhanced Thematic Mapper Plus (ETM+) data sets from the Web-Enabled Landsat Data (WELD) project. Turnkey approaches to land cover characterization were enabled due to the systematic WELD Landsat processing, including conversion of digital numbers to calibrated top of atmosphere reflectance and brightness temperature, cloud masking, reprojection into a continental map projection and temporal compositing. Annual, seasonal and monthly WELD composites for 2008 were used as spectral inputs to a bagged regression and classification tree procedure using a large training data set derived from very high spatial resolution imagery and available ancillary data. The results illustrate the ability to perform Landsat land cover characterizations at continental scales that are internally consistent while retaining local spatial and thematic detail.

  16. International Uranium Resources Evaluation Project (IUREP) national favourability studies: United Kingdom

    International Nuclear Information System (INIS)

    1977-10-01

    Although uranium prospecting was commenced in the United Kingdom (area 244,813 km) at the end of the last century and was resumed just after the Second World War, it does not seem, for various reasons, despite the level of competence of its specialists and the level of instrumentation available, that the country has been adequately prospected for uranium. The small reserves discovered to date, some 7400t U for all the official NEA/lAEA categories, probably do not reflect the true uranium potential of the United Kingdom. However, they do indicate without doubt that the resources remaining to be discovered are so located that detection will be difficult. The most promising areas of investigation in our opinion are the Old Red Sandstones of the Devonian period on the one hand and the districts where the uraniferous black shales of the Cambro-Ordovician and Namurian have suffered perturbations which may have led to immobilization of their uranium content (in particular, granitizations). All the considerations put forward in this analysis lead us to place the United Kingdom in category 4 of the classification adopted for IUREP. (author)

  17. Multi-site risk-based project planning, optimization, sequencing and budgeting process and tool for the integrated facility disposition project - 59394

    International Nuclear Information System (INIS)

    Nelson, Jerel; Castillo, Carlos; Huntsman, Julie; Lucek, Heather; Marks, Tim

    2012-01-01

    Document available in abstract form only. Full text of publication follows: Faced with the DOE Complex Transformation, NNSA was tasked with developing an integrated plan for the decommissioning of over 400 facilities and 300 environmental remediation units, as well as the many reconfiguration and modernization projects at the Oak Ridge National Laboratory (ORNL) and Y-12 Complex. Manual scheduling of remediation activities is time-consuming, labor intensive, and inherently introduces bias and unaccounted for aspects of the scheduler or organization in the process. Clearly a tool was needed to develop an objective, unbiased baseline optimized project sequence and schedule with a sound technical foundation for the Integrated Facility Disposition Project (IFDP). In generating an integrated disposition schedule, each project (including facilities, environmental sites, and remedial action units) was identified, characterized, then ranked relative to other projects. Risk matrices allowed for core project data to be extrapolated into probable contamination levels, relative risks to the public, and other technical and risk parameters to be used in the development of an overall ranking. These matrices ultimately generated a complete data set that were used in the Ranking and Sequencing Model (RSM), commonly referred to as the SUPER model, for its numerous abilities to support D and D planning, prioritization, and sequencing

  18. Groundwater quality in the Western San Joaquin Valley study unit, 2010: California GAMA Priority Basin Project

    Science.gov (United States)

    Fram, Miranda S.

    2017-06-09

    Water quality in groundwater resources used for public drinking-water supply in the Western San Joaquin Valley (WSJV) was investigated by the USGS in cooperation with the California State Water Resources Control Board (SWRCB) as part of its Groundwater Ambient Monitoring and Assessment (GAMA) Program Priority Basin Project. The WSJV includes two study areas: the Delta–Mendota and Westside subbasins of the San Joaquin Valley groundwater basin. Study objectives for the WSJV study unit included two assessment types: (1) a status assessment yielding quantitative estimates of the current (2010) status of groundwater quality in the groundwater resources used for public drinking water, and (2) an evaluation of natural and anthropogenic factors that could be affecting the groundwater quality. The assessments characterized the quality of untreated groundwater, not the quality of treated drinking water delivered to consumers by water distributors.The status assessment was based on data collected from 43 wells sampled by the U.S. Geological Survey for the GAMA Priority Basin Project (USGS-GAMA) in 2010 and data compiled in the SWRCB Division of Drinking Water (SWRCB-DDW) database for 74 additional public-supply wells sampled for regulatory compliance purposes between 2007 and 2010. To provide context, concentrations of constituents measured in groundwater were compared to U.S. Environmental Protection Agency (EPA) and SWRCB-DDW regulatory and non-regulatory benchmarks for drinking-water quality. The status assessment used a spatially weighted, grid-based method to estimate the proportion of the groundwater resources used for public drinking water that has concentrations for particular constituents or class of constituents approaching or above benchmark concentrations. This method provides statistically unbiased results at the study-area scale within the WSJV study unit, and permits comparison of the two study areas to other areas assessed by the GAMA Priority Basin Project

  19. Feasibility study of Pridneprovskaya Thermal Power Plant reconstruction project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With objectives of saving energy and reducing greenhouse gas emission at the Pridneprovskaya power plant in Ukraine, a scrap and build project has been discussed. This project will abolish the unit No.12 among the eight units in the existing coal burning power generation facilities, and install a natural gas burning combined cycle plant comprising of three units each with an output of 100 MW. The new plant facilities will consist of gas turbines, steam turbines, HRSG and auxiliary devices, and an air-cooled synchronous power generator with a capacity of 119 MVA. Use of natural gas as fuel reduces generation of soot, sulfur oxides, nitrogen oxides, and CO. In addition, the hot effluent and waste liquor effluent will decrease from those at the present plant. The required fund will be 30,107 million yen. The energy saving effect of this project is reduction of about 7.5 million tons of crude oil equivalent as a total in 40 years. The greenhouse effect gas will decrease by about 39 million tons as a total in 40 years. The profitability estimation calls for the number of investment recovery year of 16 years, and internal profit rate of 7.32%, wherein the implementation of the project cannot be expected as a project to be carried out by private funds. (NEDO)

  20. Academic Librarians and Project Management: An International Study

    Science.gov (United States)

    Serrano, Silvia Cobo; Avilés, Rosario Arquero

    2016-01-01

    Because information and documentation units in libraries have responsibility for an ever-increasing number of projects, this paper aims at analyzing the discipline of project management in library and information science (LIS) from a professional perspective. To that end, the researchers employed quantitative and qualitative methodology based on a…

  1. Environmental impacts of wind-energy projects

    National Research Council Canada - National Science Library

    Committee on Environmental Impacts of Wind Energy Projects, National Research Council

    2007-01-01

    .... Although the use of wind energy to generate electricity is increasing rapidly in the United States, government guidance to help communities and developers evaluate and plan proposed wind-energy projects is lacking...

  2. Inventory of power plants in the United States: December 1979

    International Nuclear Information System (INIS)

    Gilliam, L.R.

    1980-01-01

    This 1979 inventory of power plants provides a comprehensive list of existing, standby, out-of-service, retired and projected electric generating plants in the U.S. Arranged under the broad sections of existing, jointly owned and projected units, tabulated data on individual plants in each state are presented. These data include unit name, location, type, MW rating, primary fuel, alternative fuel, status, year built, and whether or not it is jointly owned. Jointly owned plants are separately identified as to the percent of ownership belonging to named owners. Projected plants have data on plant characteristics, current status and scheduled completion date. Summaries of the total number of each type of power plant in each state are also provided

  3. The use of interorganisational ICT in United States construction projects

    NARCIS (Netherlands)

    Adriaanse, Adriaan Maria; Voordijk, Johannes T.; Dewulf, Geert P.M.R.

    2010-01-01

    In recent research, the use of ICT applications in real time construction projects have been documented and analysed extensively. However, there is a need for identifying and analysing in-depth the mechanisms influencing the use of interorganisational ICT applications and for solutions to eliminate

  4. Ball handling system for tech united soccer robots

    NARCIS (Netherlands)

    Gerrits, K.P.; Molengraft, van de M.J.G.; Hoogendijk, R.; Steinbuch, M.

    2012-01-01

    This pre-master end project is done for team Tech United of Eindhoven University of Technology. The Tech United team is a group of students and employees who design, build and program soccer robots to compete in the RoboCup Middle Size League. RoboCup is a worldwide competition in which two teams of

  5. Touchstone for Japan's Export of nuclear power plant system. Vinh Hai unit 1 and 2 project in the Ninh Thuan province in Viet Nam

    International Nuclear Information System (INIS)

    Mitsumata, Hiroki; Takekuro, Ichiro; Kaneko, Kumao; Suzuki, Hideaki; Saito, Shinzo

    2011-01-01

    'Japan-Viet Nam Joint Statement on the Strategic Partnership for Peace and Prosperity in Asia' issued after the meeting between Japan-Viet Nam Prime Ministers on October 31, affirmed that the Vietnamese Government had decided to choose Japan as the cooperation partner for building Vinh Hai Unit 1 and 2 Project in the Ninh Thuan Province, southern Viet Nam, which showed substantially an order of Japan was arranged informally. 'International Nuclear Energy Development of Japan Co., Ltd. (JINED)' set up by industry and government, would negotiate to decide fundamental parameters such as type and power of nuclear power plants with the start of operation scheduled in 2021. This special issue consisted of six articles on significance of the project of Japan's first export, feasibility studies and future perspective and regional effects with introduction of nuclear power station in Viet Nam. (T. Tanaka)

  6. Genomics England's implementation of its public engagement strategy: Blurred boundaries between engagement for the United Kingdom's 100,000 Genomes project and the need for public support.

    Science.gov (United States)

    Samuel, Gabrielle Natalie; Farsides, Bobbie

    2018-04-01

    The United Kingdom's 100,000 Genomes Project has the aim of sequencing 100,000 genomes from National Health Service patients such that whole genome sequencing becomes routine clinical practice. It also has a research-focused goal to provide data for scientific discovery. Genomics England is the limited company established by the Department of Health to deliver the project. As an innovative scientific/clinical venture, it is interesting to consider how Genomics England positions itself in relation to public engagement activities. We set out to explore how individuals working at, or associated with, Genomics England enacted public engagement in practice. Our findings show that individuals offered a narrative in which public engagement performed more than one function. On one side, public engagement was seen as 'good practice'. On the other, public engagement was presented as core to the project's success - needed to encourage involvement and ultimately recruitment. We discuss the implications of this in this article.

  7. Baseline and projected future carbon storage and greenhouse-gas fluxes in the Great Plains region of the United States

    Science.gov (United States)

    Bouchard, Michelle; Butman, David; Hawbaker, Todd; Li, Zhengpeng; Liu, Jinxun; Liu, Shu-Guang; McDonald, Cory; Reker, Ryan R.; Sayler, Kristi; Sleeter, Benjamin; Sohl, Terry; Stackpoole, Sarah; Wein, Anne; Zhu, Zhi-Liang; Zhu, Zhi-Liang

    2011-01-01

    This assessment was conducted to fulfill the requirements of section 712 of the Energy Independence and Security Act (EISA) of 2007 and to improve understanding of carbon and greenhouse gas (GHG) fluxes in the Great Plains region in the central part of the United States. The assessment examined carbon storage, carbon fluxes, and other GHG fluxes (methane and nitrous oxide) in all major terrestrial ecosystems (forests, grasslands/shrublands, agricultural lands, and wetlands) and freshwater aquatic systems (rivers, streams, lakes, and impoundments) in two time periods: baseline (generally in the first half of the 2010s) and future (projections from baseline to 2050). The assessment was based on measured and observed data collected by the U.S. Geological Survey (USGS) and many other agencies and organizations and used remote sensing, statistical methods, and simulation models.

  8. Status and understanding of groundwater quality in the Klamath Mountains study unit, 2010: California GAMA Priority Basin Project

    Science.gov (United States)

    Bennett, George Luther; Fram, Miranda S.; Belitz, Kenneth

    2014-01-01

    Groundwater quality in the Klamath Mountains (KLAM) study unit was investigated as part of the Priority Basin Project of the California Groundwater Ambient Monitoring and Assessment (GAMA) Program. The study unit is located in Del Norte, Humboldt, Shasta, Siskiyou, Tehama, and Trinity Counties. The GAMA Priority Basin Project is being conducted by the California State Water Resources Control Board in collaboration with the U.S. Geological Survey (USGS) and the Lawrence Livermore National Laboratory. The GAMA Priority Basin Project was designed to provide a spatially unbiased, statistically robust assessment of the quality of untreated (raw) groundwater in the primary aquifer system. The assessment is based on water-quality data and explanatory factors for groundwater samples collected in 2010 by the USGS from 39 sites and on water-quality data from the California Department of Public Health (CDPH) water-quality database. The primary aquifer system was defined by the depth intervals of the wells listed in the CDPH water-quality database for the KLAM study unit. The quality of groundwater in the primary aquifer system may be different from that in the shallower or deeper water-bearing zones; shallow groundwater may be more vulnerable to surficial contamination. This study included two types of assessments: (1) a status assessment, which characterized the status of the current quality of the groundwater resource by using data from samples analyzed for volatile organic compounds, pesticides, and naturally occurring inorganic constituents, such as major ions and trace elements, and (2) an understanding assessment, which evaluated the natural and human factors potentially affecting the groundwater quality. The assessments were intended to characterize the quality of groundwater resources in the primary aquifer system of the KLAM study unit, not the quality of treated drinking water delivered to consumers by water purveyors. Relative-concentrations (sample concentrations

  9. Comparative Power Projectional Capabilities: The Soviet Union and the United States 1980-85.

    Science.gov (United States)

    1981-02-26

    Comparisons 2 LDC Growth of GDP , 1970-1990 3 Major LDC Primary Product and Manufactured Good Exporters 4 LDCs with Declining Terms of Trade 5 External Public...Amphibious Unit -- Southern Spain & Western Mediterranean -Marine Amphibious Unit Auckland , New Zealand - Infantry Company Okinawa, Japan - Marine

  10. Developing Boiler Concepts as Integrated Units

    DEFF Research Database (Denmark)

    Sørensen, Kim; Condra, Thomas Joseph; Houbak, Niels

    2004-01-01

    - consisting of pressure part, burner and control system. The Technical University of Denmark, MEK - Energy Engineering Section [12] has participated in the modelling process. The project has included static and dynamic modelling of the boiler concept. For optimization of operation, verication of performance......With the objective to be able to optimize the design and operation of steam boiler concepts Aalborg Industries A/S [1] has together with Aalborg University, Institute of Energy Technology [9] carried out a development project paying special attention to the boiler concept as an integrated unit......, emissions and to obtain long time operation experiences with the boiler concept, a full scale prototype has been built and these tests have been accomplished on the prototype. By applying this integrated unit approach to the boiler concept development it has been possible to optimize the different building...

  11. D and D projects trends

    International Nuclear Information System (INIS)

    Gay, Arnaud

    2012-01-01

    This series of slides presents: 1 - the Various types of needs and types of operations in any D and D project, 2 - the strong variety of nuclear units to dismantle, 3 - the D and D dependence on nuclear operators' strategy (Immediate/Deferred dismantling), 4 - the demand for D and D services with respect to the ageing of the nuclear fleet, 5 - the impacts to come on the D and D environment due to the Fukushima accident, 6 - the geographical dependence of D and D demands, 7 - the different D and D choices from nuclear operators in the supply chain management, 8 - the key levers in a D and D project performance, 9 - Some key competencies in D and D, 10 - Risk management for both clients and suppliers in a D and D project, 11 - AREVA involvement in Fukushima project as a key demonstration of a critical D and D project management

  12. Changes in Default Alarm Settings and Standard In-Service are Insufficient to Improve Alarm Fatigue in an Intensive Care Unit: A Pilot Project.

    Science.gov (United States)

    Sowan, Azizeh Khaled; Gomez, Tiffany Michelle; Tarriela, Albert Fajardo; Reed, Charles Calhoun; Paper, Bruce Michael

    2016-01-11

    Clinical alarm systems safety is a national concern, specifically in intensive care units (ICUs) where alarm rates are known to be the highest. Interventional projects that examined the effect of changing default alarm settings on overall alarm rate and on clinicians' attitudes and practices toward clinical alarms and alarm fatigue are scarce. To examine if (1) a change in default alarm settings of the cardiac monitors and (2) in-service nursing education on cardiac monitor use in an ICU would result in reducing alarm rate and in improving nurses' attitudes and practices toward clinical alarms. This quality improvement project took place in a 20-bed transplant/cardiac ICU with a total of 39 nurses. We implemented a unit-wide change of default alarm settings involving 17 parameters of the cardiac monitors. All nurses received an in-service education on monitor use. Alarm data were collected from the audit log of the cardiac monitors 10 weeks before and 10 weeks after the change in monitors' parameters. Nurses' attitudes and practices toward clinical alarms were measured using the Healthcare Technology Foundation National Clinical Alarms Survey, pre- and postintervention. Alarm rate was 87.86 alarms/patient day (a total of 64,500 alarms) at the preintervention period compared to 59.18 alarms/patient day (49,319 alarms) postintervention (P=.01). At baseline, Arterial Blood Pressure (ABP), Pair Premature Ventricular Contractions (PVCs), and Peripheral Capillary Oxygen Saturation (SpO2) alarms were the highest. ABP and SpO2 alarms remained among the top three at the postproject period. Out of the 39 ICU nurses, 24 (62%) provided complete pre- and postproject survey questionnaires. Compared to the preintervention survey, no remarkable changes in the postproject period were reported in nurses' attitudes. Themes in the narrative data were related to poor usability of cardiac monitors and the frequent alarms. The data showed great variation among nurses in terms of changing

  13. Project designing of Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Krychtalek, Z.; Linek, V.

    1989-01-01

    The geological and seismic parameters are listed of the Temelin nuclear power plant. The division of the site in building zones is described. The main zones consist of the power generation unit zone with the related auxiliary buildings of hot plants and of the auxiliary buildings of the nonactive part with industrial buildings. The important buildings are interconnected with communication and technology bridges. Cooling towers and spray pools and the entrance area are part of the urbanistic design. The architectonic design of the buildings uses standard building elements and materials. The design of the buildings is based on the requirements on their function and on structural load and on the demands of maximal utilization of the type of the reinforced concrete prefab structure system. The structure is made of concrete or steel cells. The project design is based on Soviet projects. The layout is shown of the main power generation units and a section is presented of a 1,000 MW unit. (J.B.). 2 figs

  14. Spatial fuel data products of the LANDFIRE Project

    Science.gov (United States)

    Matt Reeves; Kevin C. Ryan; Matthew G. Rollins; Thomas G. Thompson

    2009-01-01

    The Landscape Fire and Resource Management Planning Tools (LANDFIRE) Project is mapping wildland fuels, vegetation, and fire regime characteristics across the United States. The LANDFIRE project is unique because of its national scope, creating an integrated product suite at 30-m spatial resolution and complete spatial coverage of all lands within the 50...

  15. Implementation of Trauma-Informed Care and Brief Solution-Focused Therapy: A Quality Improvement Project Aimed at Increasing Engagement on an Inpatient Psychiatric Unit.

    Science.gov (United States)

    Aremu, Babatunde; Hill, Pamela D; McNeal, Joanne M; Petersen, Mary A; Swanberg, Debbie; Delaney, Kathleen R

    2018-03-14

    Addressing tense and escalating situations with noncoercive measures is an important element of inpatient psychiatric treatment. Although restraint rates are frequently monitored, the use of pro re nata (PRN) intramuscular (IM) injections to address agitation is also an important indicator. In 2015, at the current study site, a significant increase was noted in PRN IM medication use despite unit leadership's efforts to build a culture of trauma-informed care (TIC). The purpose of the current quality improvement project was to educate staff on methods to incorporate TIC into daily practice and the use of brief solution-focused therapy techniques in escalating situations. Measurement of attitudes toward patient aggression and engagement with patients followed two waves of staff education. Upon completion of the project, a decrease in PRN IM medications, improvement in staff attitudes toward patient aggression, and improved sense of staff competency in handling tense situations were noted. [Journal of Psychosocial Nursing and Mental Health Services, xx(x), xx-xx.]. Copyright 2018, SLACK Incorporated.

  16. Groundwater quality data in 15 GAMA study units: results from the 2006–10 Initial sampling and the 2009–13 resampling of wells, California GAMA Priority Basin Project

    Science.gov (United States)

    Kent, Robert

    2015-08-31

    The Priority Basin Project (PBP) of the Groundwater Ambient Monitoring and Assessment (GAMA) program was developed in response to the Groundwater Quality Monitoring Act of 2001 and is being conducted by the U.S. Geological Survey (USGS) in cooperation with the California State Water Resources Control Board (SWRCB). From May 2004 to March 2012, the GAMA-PBP collected samples from more than 2,300 wells in 35 study units across the State. Selected wells in each study unit were sampled again approximately 3 years after initial sampling as part of an assessment of temporal trends in water quality by the GAMA-PBP. This triennial (every 3 years) trend sampling of GAMA-PBP study units concluded in December 2013. Fifteen of the study units, initially sampled between January 2006 and June 2010 and sampled a second time between April 2009 and April 2013 to assess temporal trends, are the subject of this report.

  17. Global context for the United States Forest Sector in 2030

    Science.gov (United States)

    James Turner; Joseph Buongiorno; Shushuai Zhu; Jeffrey P. Prestemon

    2005-01-01

    The purpose of this study was to identify markets for, and competitors to, the United States forest industries in the next 30 years. The Global Forest Products Model was used to make predictions of international demand, supply, trade, and prices, conditional on the last RPA Timber Assessment projections for the United States. It was found that the United States, Japan...

  18. The 8000 MW project

    Energy Technology Data Exchange (ETDEWEB)

    Ubis, T. [Repsol YPF (Spain); Bressan, L. [Foster Wheeler (Italy); O' Keefe, L. [Texaco Power and Gasification (Netherlands)

    2001-04-01

    The article describes the heavy oil integrated gasification combined cycle (IGCC) complex designed to process the high sulfur by-products from the nearby Petronor Refinery (in Spain) and produce hydrogen and electricity. The process units and their feedstocks are described. The design and operation of the gasification unit and what it achieves are also described. The raw syngas from the scrubbers in the gasification unit is processed so that it can be fed to the combined cycle. How raw gas syngas cooling is carried out is described in outline. In the sulfur recovery units, the MDEA-rich solution (from the absorption tower) is expanded in a hydraulic turbine to recover power to pump the lean MDEA stream to the absorption tower. The Power Island is described under the sub-headings of: (i) quench gasification technology; (ii) IGCC complex performance; (iii) environmental compact; (iv) the site; (v) project implementation program and (vi) investment cost.

  19. Integrated project management type contracts

    International Nuclear Information System (INIS)

    Heisler, S.I.

    1975-01-01

    The concept of integrated project management represents a single source to which the owner can turn for all project management functions excepting for those relating to outside parties such as site purchase, personnel selection etc. Other functions such as design, procurement, construction management, schedule and cost control, quality assurance/quality control are usually handled by the integrated project manager as the agent of the owner. The arrangement is flexible and the responsibilities can be varied to suit the size and experience of the owner. Past experience in the United States indicates an increase in the trend toward IPM work and it appears that overseas this trend is developing also. (orig./RW) [de

  20. All projects related to | Page 630 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Kenya-Malawi Health Research Capacity Strengthening Initiative - Inception Phase. Project. In 2004, the Wellcome Trust and the United ... Transitional Justice and the Rise of the Truth and Reconciliation Commission Model in Africa : Emerging Lessons - Phase I. Project. Eastern Africa has experienced more than its fair ...

  1. The TIMSS Videotape Classroom Study: Methods and Findings from an Exploratory Research Project on Eighth-Grade Mathematics Instruction in Germany, Japan, and the United States. A Research and Development Report.

    Science.gov (United States)

    Stigler, James W.; Gonzales, Patrick; Kwanaka, Takako; Knoll, Steffen; Serrano, Ana

    This report presents the methods and preliminary findings of the Videotape Classroom Study, a video study of eighth-grade mathematics lessons in Germany, Japan, and the United States. This exploratory research project is part of the Third International Mathematics and Science Study (TIMSS). The study included 231 eighth-grade mathematics…

  2. United States Navy DL Perspective

    Science.gov (United States)

    2010-08-10

    United States Navy DL Perspective CAPT Hank Reeves Navy eLearning Project Director 10 August 2010 Report Documentation Page Form ApprovedOMB No...Marine Corps (USMC) Navy eLearning Ongoing Shared with USMC, Coast Guard 9 NeL Help Site https://ile-help.nko.navy.mil/ile/ https://s-ile

  3. Accounting Early for Life Long Learning: The AcE Project.

    Science.gov (United States)

    University Coll. Worcester (England). Centre for Research in Early Childhood Education.

    Building upon the work of the Effective Early Learning (EEL) Project in raising the quality of early learning for young children in the United Kingdom, the 3-year Accounting Early for Life Long Learning Project (AcE Project) focuses on enhancing in 3- to 6-year-olds those attitudes and dispositions that are important to life-long learning. This…

  4. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 415: Project 57 No. 1 Plutonium Dispersion (NTTR), Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick; Burmeister, Mark

    2014-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 415, Project 57 No. 1 Plutonium Dispersion (NTTR). CAU 415 is located on Range 4808A of the Nevada Test and Training Range (NTTR) and consists of one corrective action site: NAFR-23-02, Pu Contaminated Soil. The CAU 415 site consists of the atmospheric release of radiological contaminants to surface soil from the Project 57 safety experiment conducted in 1957. The safety experiment released plutonium (Pu), uranium (U), and americium (Am) to the surface soil over an area of approximately 1.9 square miles. This area is currently fenced and posted as a radiological contamination area. Vehicles and debris contaminated by the experiment were subsequently buried in a disposal trench within the surface-contaminated, fenced area and are assumed to have released radiological contamination to subsurface soils. Potential source materials in the form of pole-mounted electrical transformers were also identified at the site and will be removed as part of closure activities.

  5. NPP Cernavoda unit 2 economic viability: The challenge for an advanced financing scheme

    International Nuclear Information System (INIS)

    Condu, M.; Popescu, D.

    1999-01-01

    The completion of Cernavoda Unit-2 being no doubt, the viability of the project was analyzed and strengthened. Economic justification of the decision to complete Unit-2 is described, including assessment of its safety design guides, design requirements and engineering design solutions in the light of changes in codes, guideline, standards and actual regulatory requirements. Cost-benefit analysis demonstrates the economic viability of the project

  6. The Southern Forest Futures Project: summary report

    Science.gov (United States)

    David N. Wear; John G. Greis

    2012-01-01

    The Southern Forest Futures Project provides a science-based “futuring” analysis of the forests of the 13 States of the Southeastern United States. With findings organized in a set of scenarios and using a combination of computer models and science synthesis, the authors of the Southern Forest Futures Project examine a variety of possible futures that could shape...

  7. Preparation of physics commissioning of Mochovce units 3 and 4

    International Nuclear Information System (INIS)

    Sedlacek, M.; Chrapciak, V.

    2010-01-01

    The Project 'Mochovce Units 3 and 4 Completion' started in 2009 and it will be finished in 2013. VUJE, Inc. is one of the five main Project contractors for the Nuclear Island and it is responsible, inter alia, for Mochovce Units 3 and 4 commissioning. The commissioning of Units 3 and 4 includes the stages of Physics Commissioning and Power Commissioning. This paper deals with the preparation of Mochovce Units 3 and 4 Physics Commissioning. In the paper there is presented a preparation of some commissioning documents, e.g. 'Quality Assurance Programme', 'Commissioning Programme', 'Stage Programme for Physics Commissioning', 'Test working programmes', 'Neutron-physics characteristics for Physics and Power Commissioning', etc. The scope of Physics Commissioning is presented by list of tests. For assessment of tests results so-called three-level acceptance criteria will be applied: realization, design and safety criteria. In the paper there are also presented computer codes, which will be used for neutron-physics characteristics calculation and the fuel loading scheme for the reactor core of Mochovce Unit 3. (Authors)

  8. Sustainable Mining Land Use for Lignite Based Energy Projects

    Science.gov (United States)

    Dudek, Michal; Krysa, Zbigniew

    2017-12-01

    This research aims to discuss complex lignite based energy projects economic viability and its impact on sustainable land use with respect to project risk and uncertainty, economics, optimisation (e.g. Lerchs and Grossmann) and importance of lignite as fuel that may be expressed in situ as deposit of energy. Sensitivity analysis and simulation consist of estimated variable land acquisition costs, geostatistics, 3D deposit block modelling, electricity price considered as project product price, power station efficiency and power station lignite processing unit cost, CO2 allowance costs, mining unit cost and also lignite availability treated as lignite reserves kriging estimation error. Investigated parameters have nonlinear influence on results so that economically viable amount of lignite in optimal pit varies having also nonlinear impact on land area required for mining operation.

  9. Economics of nuclear power projects

    International Nuclear Information System (INIS)

    Chu, I.H.

    1985-01-01

    Nuclear power development in Taiwan was initiated in 1956. Now Taipower has five nuclear units in smooth operation, one unit under construction, two units under planning. The relatively short construction period, low construction costs and twin unit approach had led to the significant economical advantage of our nuclear power generation. Moreover betterment programmes have further improved the availability and reliability factors of our nuclear power plants. In Taipower, the generation cost of nuclear power was even less than half of that of oil-fired thermal power in the past years ever since the nuclear power was commissioned. This made Taipower have more earnings and power rates was even dropped down in March 1983. As Taiwan is short of energy sources and nuclear power is so well-demonstrated nuclear power will be logically the best choice for Taipower future projects

  10. Why new tools were developed for the 'GeoPortalNetwork : Liberty United" project

    NARCIS (Netherlands)

    Vanmeulebrouk, B.; Van Swol, R.; Kuyper, M.; Bulens, J.; Zevenbergen, J.A.

    2009-01-01

    As part of the national innovation co-funding scheme “Space for Geo-information” the project “GeoPortal Network: Liberty United” ran from late 2005 till the end of 2008. Purpose of the project was to promote access to geo-spatial information via web services. To achieve this goal, a network of

  11. Correcting a Persistent Manhattan Project Statistical Error

    Science.gov (United States)

    Reed, Cameron

    2011-04-01

    In his 1987 autobiography, Major-General Kenneth Nichols, who served as the Manhattan Project's ``District Engineer'' under General Leslie Groves, related that when the Clinton Engineer Works at Oak Ridge, TN, was completed it was consuming nearly one-seventh (~ 14%) of the electric power being generated in the United States. This statement has been reiterated in several editions of a Department of Energy publication on the Manhattan Project. This remarkable claim has been checked against power generation and consumption figures available in Manhattan Engineer District documents, Tennessee Valley Authority records, and historical editions of the Statistical Abstract of the United States. The correct figure is closer to 0.9% of national generation. A speculation will be made as to the origin of Nichols' erroneous one-seventh figure.

  12. Lights! Camera! Action Projects! Engaging Psychopharmacology Students in Service-based Action Projects Focusing on Student Alcohol Abuse.

    Science.gov (United States)

    Kennedy, Susan

    2016-01-01

    Alcohol abuse continues to be an issue of major concern for the health and well-being of college students. Estimates are that over 80% of college students are involved in the campus "alcohol culture." Annually, close to 2000 students die in the United States due to alcohol-related accidents, with another 600,000 sustaining injury due to alcohol-related incidents (NIAAA, 2013). Students enrolled in a Psychopharmacology course engaged in action projects (community outreach) focused on alcohol abuse on our campus. Research has indicated that these types of projects can increase student engagement in course material and foster important skills, including working with peers and developing involvement in one's community. This paper describes the structure and requirements of five student outreach projects and the final projects designed by the students, summarizes the grading and assessment of the projects, and discusses the rewards and challenges of incorporating such projects into a course.

  13. Purposes and related aspects of the nuclear power plant aging Project

    International Nuclear Information System (INIS)

    Garaud, J.; Reynes, L.; Montardy, A. de

    1989-01-01

    The purposes and some aspects of the nuclear power plant Lifetime project is presented. The work is focused on the study of the aging of the PWR type power plant components. The project consists in two phases. The first one involves: the status reports and the analysis of the lifetime data of the most sensitive units, as well as the applied actions and proposals, the influence of the exploitation modes, the safety and the cost prospectives. The second phase includes: the definition, the contracts, the complementary actions and their achievement, the reasons and the surveyance improvements, the development of the decision supporting means, the summary and the conclusions. The selected units for the project first step and the project of actions, are listed. The first conclusions of the project show that most of the 900 MW PWR reactor components will have about 40 years of service life [fr

  14. Automated metadata--final project report

    International Nuclear Information System (INIS)

    Schissel, David

    2016-01-01

    This report summarizes the work of the Automated Metadata, Provenance Cataloging, and Navigable Interfaces: Ensuring the Usefulness of Extreme-Scale Data Project (MPO Project) funded by the United States Department of Energy (DOE), Offices of Advanced Scientific Computing Research and Fusion Energy Sciences. Initially funded for three years starting in 2012, it was extended for 6 months with additional funding. The project was a collaboration between scientists at General Atomics, Lawrence Berkley National Laboratory (LBNL), and Massachusetts Institute of Technology (MIT). The group leveraged existing computer science technology where possible, and extended or created new capabilities where required. The MPO project was able to successfully create a suite of software tools that can be used by a scientific community to automatically document their scientific workflows. These tools were integrated into workflows for fusion energy and climate research illustrating the general applicability of the project's toolkit. Feedback was very positive on the project's toolkit and the value of such automatic workflow documentation to the scientific endeavor.

  15. Russian Language Analysis Project

    Science.gov (United States)

    Serianni, Barbara; Rethwisch, Carolyn

    2011-01-01

    This paper is the result of a language analysis research project focused on the Russian Language. The study included a diverse literature review that included published materials as well as online sources in addition to an interview with a native Russian speaker residing in the United States. Areas of study include the origin and history of the…

  16. Status of groundwater quality in the Southern, Middle, and Northern Sacramento Valley study units, 2005-08: California GAMA Priority Basin Project

    Science.gov (United States)

    Bennett, George L.; Fram, Miranda S.; Belitz, Kenneth

    2011-01-01

    Groundwater quality in the Southern, Middle, and Northern Sacramento Valley study units was investigated as part of the Priority Basin Project of the Groundwater Ambient Monitoring and Assessment (GAMA) Program. The study units are located in California's Central Valley and include parts of Butte, Colusa, Glenn, Placer, Sacramento, Shasta, Solano, Sutter, Tehama, Yolo, and Yuba Counties. The GAMA Priority Basin Project is being conducted by the California State Water Resources Control Board in collaboration with the U.S. Geological Survey and the Lawrence Livermore National Laboratory. The three study units were designated to provide spatially-unbiased assessments of the quality of untreated groundwater in three parts of the Central Valley hydrogeologic province, as well as to provide a statistically consistent basis for comparing water quality regionally and statewide. Samples were collected in 2005 (Southern Sacramento Valley), 2006 (Middle Sacramento Valley), and 2007-08 (Northern Sacramento Valley). The GAMA studies in the Southern, Middle, and Northern Sacramento Valley were designed to provide statistically robust assessments of the quality of untreated groundwater in the primary aquifer systems that are used for drinking-water supply. The assessments are based on water-quality data collected by the USGS from 235 wells in the three study units in 2005-08, and water-quality data from the California Department of Public Health (CDPH) database. The primary aquifer systems (hereinafter, referred to as primary aquifers) assessed in this study are defined by the depth intervals of the wells in the CDPH database for each study unit. The quality of groundwater in shallow or deep water-bearing zones may differ from quality of groundwater in the primary aquifers; shallow groundwater may be more vulnerable to contamination from the surface. The status of the current quality of the groundwater resource was assessed by using data from samples analyzed for volatile organic

  17. Project-Based Learning Not Just for STEM Anymore

    Science.gov (United States)

    Duke, Nell K.; Halvorsen, Anne-Lise; Strachan, Stephanie L.

    2016-01-01

    The popularity of project-based learning has been driven in part by a growing number of STEM schools and programs. But STEM subjects are not the only fertile ground for project-based learning (PBL). Social studies and literacy content, too, can be adapted into PBL units to benefit teaching and learning, the authors argue. They review key studies…

  18. United Nations opens gender coordinating unit for Afghanistan.

    Science.gov (United States)

    Morris, K

    1999-02-06

    The UN has created a gender coordinating unit for Afghanistan in an effort to combat some problems encountered by women and girls in the country. Reports continue to come in of women in Afghanistan being denied the right to work, to be educated, and to have access to medical care. The gap in education between men and women continues to widen as a result of edicts issued by Taliban authorities banning girls from attending formal schools and female teachers from working. The situation has grown worse since the UN and nongovernmental organizations (NGOs) withdrew international workers last year due to security concerns. Although a UN mission will travel to the country this week to discuss the return of international staff, the gender coordinating unit will for now have to work out of Islamabad, Pakistan. The unit will create guidelines for gender mainstreaming, a strategy in which mainstream policies and resource allocations are changed to reflect the principle of gender equality. Other goals include setting realistic objectives for gender activities, working with partners on pilot projects, and establishing minimum standards for best practices. MERLIN, a NGO with a primary health care program run by local staff in the Taliban-controlled province of Farah, welcomes the move.

  19. Understanding map projections: Chapter 15

    Science.gov (United States)

    Usery, E. Lynn; Kent, Alexander J.; Vujakovic, Peter

    2018-01-01

    It has probably never been more important in the history of cartography than now that people understand how maps work. With increasing globalization, for example, world maps provide a key format for the transmission of information, but are often poorly used. Examples of poor understanding and use of projections and the resultant maps are many; for instance, the use of rectangular world maps in the United Kingdom press to show Chinese and Korean missile ranges as circles, something which can only be achieved on equidistant projections and then only from one launch point (Vujakovic, 2014).

  20. Operation of South Texas Project, Units 1 and 2 Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et.al., Matagorda County, Texas

    International Nuclear Information System (INIS)

    1986-08-01

    The final environmental impact statement (EPA No. 860376F) on a proposal to issue operating licenses for units 1 and 2 of the South Texas Project describes the two pressurized waters reactors that will produce 1250 MWe per unit. A closed-cycle will use water from the Colorado River for cooling. The site will include prime farmland. The study finds no significant effect on aquatic productivity of the river and no disruptions of the terrestrial biota. Economic benefits will include about 1800 new jobs, which will raise tax revenues and spur the local economy. Area marsh lands and wildlife habitat will suffer. The risk of exposure to accidental radiation is considered very low. The Federal Water Pollution Control Act of 1972 and Nuclear Regulatory Commission Licensing require the impact study

  1. TRIP RATES FOR CONDOMINIUM CONSTRUCTION PROJECT

    Directory of Open Access Journals (Sweden)

    Wirach Hirun

    2015-01-01

    Full Text Available The number of large scale condominium construction projects had dramatically increased in Bangkok. Many projects had occurred in either densely populated areas or in central business districts, where traffic conditions were usually highly congested. To prevent traffic problems, a traffic impact study must be prepared and submitted for review by concerned public authorities. Unit trip generation rates were important data in traffic impact analysis. Without accurate unit trip generation rates, public agencies could not obtain accurate information on the traffic that will be generated. This study aimed to study trip rates and the factors affecting them for condominium construction project in Bangkok. The data were collected from 30 condominium construction sites located in 15 districts of Bangkok. The analysis used the linear regression method and was divided into three cases: 1 trip rates for all vehicles, 2 trip rates for classified vehicles, and 3 trip rates for all types of condominium. All case analyses considered weekdays, Saturday, and Sunday. The results found that trip rates related to the number of dwellings in the condominium. The trip rates for all vehicle types on weekdays, Saturday, and Sunday were 10.636, 4.647, and 9.294 vehicles per 100 dwelling units per day respectively. The trip rates for six-wheeled and ten-wheeled trucks on weekdays, Saturday, and Sunday were 2.046, 0.975, and 0.575 vehicles per 100 dwelling units per day respectively. The trip rate for four-wheeled trucks and passenger cars on weekdays was 1.960. Regarding condominium types, the trip rate for low rise condominiums for all vehicle types on weekdays was 5.315 while the trip rates for high rise condominiums for weekdays, Saturday, and Sunday were 3.965, 2.667, and 1.261 respectively.

  2. Cost benchmarking of railway projects in Europe – can it help to reduce costs?

    DEFF Research Database (Denmark)

    Trabo, Inara; Landex, Alex; Nielsen, Otto Anker

    a certain overview of the range of costs in various budget disciplines. The Copenhagen-Ringsted project is shown to be right in the middle of the range in terms of total costs per kilometre, and its values in the discipline comparisons do not significantly differ from the values of the less expensive...... projects. Deeper analysis of project unit costs is still continuing, but the preliminary results show that the cost values for projects located in the same geographical zone are similar. For example, this can be explained by their use of the same construction companies. However, unit prices in southern...

  3. Environmental Impact Assessment for Olkiluoto 4 Nuclear Power Plant Unit in Finland

    International Nuclear Information System (INIS)

    Dersten, Riitta; Gahmberg, Sini; Takala, Jenni

    2008-01-01

    In order to improve its readiness for constructing additional production capacity, Teollisuuden Voima Oyj (TVO) initiated in spring 2007 the environmental impact assessment procedure (EIA procedure) concerning a new nuclear power plant unit that would possibly be located at Olkiluoto. When assessing the environmental impacts of the Olkiluoto nuclear power plant extension project, the present state of the environment was first examined, and after that, the changes caused by the projects as well as their significance were assessed, taking into account the combined impacts of the operations at Olkiluoto. The environmental impact assessment for the planned nuclear power plant unit covers the entire life cycle of the plant unit. (authors)

  4. Environmental Impact Assessment for Olkiluoto 4 Nuclear Power Plant Unit in Finland

    Energy Technology Data Exchange (ETDEWEB)

    Dersten, Riitta; Gahmberg, Sini; Takala, Jenni [Teollisuuden Voima Oyj, Olkiluoto, FI-27160 Eurajoki (Finland)

    2008-07-01

    In order to improve its readiness for constructing additional production capacity, Teollisuuden Voima Oyj (TVO) initiated in spring 2007 the environmental impact assessment procedure (EIA procedure) concerning a new nuclear power plant unit that would possibly be located at Olkiluoto. When assessing the environmental impacts of the Olkiluoto nuclear power plant extension project, the present state of the environment was first examined, and after that, the changes caused by the projects as well as their significance were assessed, taking into account the combined impacts of the operations at Olkiluoto. The environmental impact assessment for the planned nuclear power plant unit covers the entire life cycle of the plant unit. (authors)

  5. Project finance and photovoltaic power plants : a theoretical and practical perspective

    OpenAIRE

    Aasgaard, Anne Kristine

    2010-01-01

    Project finance is a defined structure for developing new activity which involves establishing the project as a separate unit. The review of literature exhibits the distinctive characteristics of project finance and provides a rationale of this form of financing. Project finance entails financial modelling, risk management, legal aspects and the creation of a financial structure. The thesis explores practical use of project finance in a case study of a photovoltaic power plant and presents a ...

  6. Planning for closures of hazardous waste land disposal units at the Oak Ridge Y-12 plant

    International Nuclear Information System (INIS)

    Welch, S.H.; Kelly, B.A.; DeLozier, M.F.P.; Manrod, W.E.

    1988-01-01

    Eight hazardous waste land disposal units at the Oak Ridge Y-12 Plant are being closed in accordance with the Resource Conservation and Recovery Act (RCRA) under an integrated multi-year program. The units, some of which date back to the early 1950s and include five surface impoundments, two landfills and a land treatment unit, have been used for the management of a variety of types of hazardous wastes. Closure plans for the units have been submitted and are in various stages of revision and regulatory review. The units will be closed by various combinations of methods, including liquid removal and treatment, sludge stabilization, contaminated sludge and/or soil removal, and capping. Closure of all eight units must be initiated by November 8, 1988. Funding for the eight closures is being provided by a new Department of Energy budget category, the environmental Restoration Budget Category (ERBC), which is intended to allow for a more rapid response to environmental problems and regulatory requirements. A major project, Closure and Post-Closure Activities (CAPCA) has been identified for ERBC funding to close the land disposal units in accordance with RCRA requirements. Establishing the project scope has required the development of a detailed set of assumptions and a confirmation program for each assumption. Other significant activities in the CAPCA project include risk assessments and the preparation of an integrated project schedule

  7. Alternative techniques for environmental project management

    International Nuclear Information System (INIS)

    Reeves, S.

    1994-01-01

    Beginning in the late 1970s and early 1980s, increased regulation and recognition of ground water as an important natural resource led industry to address subsurface contamination at many sites. This caused the industry's dependence on environmental consultants to increase drastically. Initially, the accepted practice for addressing environmental concerns was to rely upon consultants to determine appropriate work scope, budgets, procedures and regulatory interaction. While significant advances have been made in technology and consulting services, improvement in project management and cost containment have been limited. In order to effectively manage environmental projects, it is imperative that business risks and standardized project management practices be factored into environmental solutions. A standardized environmental project management program was developed and applied to projects at petroleum marketing facilities throughout the United States. Following development and implementation, detailed studies were conducted to measure the value of standardization in reducing costs and enhancing efficiencies. The results indicate significant improvement in both reducing project costs and in enhancing the efficiency of consultants

  8. The Cernavoda project - past and future

    International Nuclear Information System (INIS)

    Glodeanu, F.; Campureanu, T.; Chirica, T.; Popescu, D.

    1995-01-01

    The history of the Cernavoda nuclear power station in Romania is traced. It was conceived in 1977 as five unit CANDU-6 station and agreements were concluded on engineering, procurement and financial assistance with Atomic Energy of Canada Ltd (AECL) and Ansaldo of Italy. Delays in construction were created from the first, however, by efforts to manufacture as many components as possible in Romania, unfamiliarity with nuclear project management and the disadvantages of a highly centralised economy. Political changes since December 1989 have led to a new approach to project implementation. The Romanian Electricity Authority (RENEL), signed a new contract with AECL and Ansaldo in August 1991 to perform the project management for the completion of Cernavoda 1. The project has progressed very well and by the beginning of 1995 more than 90% of the plant systems were ready for commissioning and a full operating shift was in place. As a second phase of the nuclear power programme RENEL plans to complete Cernavoda 2, the construction of which was suspended at 30% completion. The three other units will be preserved in their present preliminary stage of construction up to 2000 while finance is sought for their completion. Nuclear power is seen as an environmentally clean means of meeting Romania's growing energy demand as the economy develops. (UK)

  9. Engaging Clinical Nurses in Quality Improvement Projects.

    Science.gov (United States)

    Moore, Susan; Stichler, Jaynelle F

    2015-10-01

    Clinical nurses have the knowledge and expertise required to provide efficient and proficient patient care. Time and knowledge deficits can prevent nurses from developing and implementing quality improvement or evidence-based practice projects. This article reviews a process for professional development of clinical nurses that helped them to define, implement, and analyze quality improvement or evidence-based practice projects. The purpose of this project was to educate advanced clinical nurses to manage a change project from inception to completion, using the Six Sigma DMAIC (Define, Measure, Analyze, Improve, Control) Change Acceleration Process as a framework. One-to-one mentoring and didactic in-services advanced the knowledge, appreciation, and practice of advanced practice clinicians who completed multiple change projects. The projects facilitated clinical practice changes, with improved patient outcomes; a unit cultural shift, with appreciation of quality improvement and evidence-based projects; and engagement with colleagues. Project outcomes were displayed in poster presentations at a hospital exposition for knowledge dissemination. Copyright 2015, SLACK Incorporated.

  10. Project CHOICE: #26. A Career Education Unit for Junior High School. Careers in Conservation of the Environment and Natural Resources. (Agriculture and Ecological Studies Cluster; Science and Engineering Occupations Cluster).

    Science.gov (United States)

    Kern County Superintendent of Schools, Bakersfield, CA.

    This junior high teaching unit on careers in conservation of the environment and natural resources is one in a series of career guidebooks developed by Project CHOICE (Children Have Options in Career Education) to provide the classroom teacher with a source of career-related activities linking classroom experiences with the world of work. The unit…

  11. On Tour... Primary Hardwood Processing, Products and Recycling Unit

    Science.gov (United States)

    Philip A. Araman; Daniel L. Schmoldt

    1995-01-01

    Housed within the Department of Wood Science and Forest Products at Virginia Polytechnic Institute is a three-person USDA Forest Service research work unit (with one vacancy) devoted to hardwood processing and recycling research. Phil Araman is the project leader of this truly unique and productive unit, titled ãPrimary Hardwood Processing, Products and Recycling.ä The...

  12. Environmental measures for Escuintla No. 3 unit thermal power project

    Energy Technology Data Exchange (ETDEWEB)

    Quisquinay, Carlos; Fabian Rosales, Alejandro [Instituto Nacional de Electrificacion, (Guatemala)

    1997-12-31

    The environmental measures in relation to the project implementation was studied with reference to the Japanese Standards and incorporated in the Implementation Program. This report is prepared however, to review the environmental measures for the project in more detail as to the allowable standards and regulations concerning the measures for the environmental pollution. The authors present the environmental conditions around the Escuintla Power Station in Guatemala; the measures for environmental pollution and evaluation; the measures for prevention of air pollution and diffusion calculations (estimation and assessment of environmental impacts) [Espanol] Las medidas ambientales con relacion a la consolidacion del proyecto, se estudiaron con referencia a los Estandares Japoneses e incorporados en el Programa de Consolidacion. Sin embargo, este reporte ha sido preparado para revisar las medidas ambientales para el proyecto mas detalladamente, con relacion a los estandares y reglamentaciones admisibles concernientes a las medidas de contaminacion ambiental. Los autores presentan las condiciones ambientales en los alrededores de la Central Termoelectrica de Escuintla de Guatemala; las medidas para la prevencion de la contaminacion del aire y los calculos de difusion (estimacion y evaluacion del impacto ambiental)

  13. Environmental measures for Escuintla No. 3 unit thermal power project

    Energy Technology Data Exchange (ETDEWEB)

    Quisquinay, Carlos; Fabian Rosales, Alejandro [Instituto Nacional de Electrificacion, (Guatemala)

    1996-12-31

    The environmental measures in relation to the project implementation was studied with reference to the Japanese Standards and incorporated in the Implementation Program. This report is prepared however, to review the environmental measures for the project in more detail as to the allowable standards and regulations concerning the measures for the environmental pollution. The authors present the environmental conditions around the Escuintla Power Station in Guatemala; the measures for environmental pollution and evaluation; the measures for prevention of air pollution and diffusion calculations (estimation and assessment of environmental impacts) [Espanol] Las medidas ambientales con relacion a la consolidacion del proyecto, se estudiaron con referencia a los Estandares Japoneses e incorporados en el Programa de Consolidacion. Sin embargo, este reporte ha sido preparado para revisar las medidas ambientales para el proyecto mas detalladamente, con relacion a los estandares y reglamentaciones admisibles concernientes a las medidas de contaminacion ambiental. Los autores presentan las condiciones ambientales en los alrededores de la Central Termoelectrica de Escuintla de Guatemala; las medidas para la prevencion de la contaminacion del aire y los calculos de difusion (estimacion y evaluacion del impacto ambiental)

  14. A new nuclear power project in the United States: Reality or fantasy?

    International Nuclear Information System (INIS)

    Redding, J.R.; Veitch, C.

    1996-01-01

    There is a way to go before a new nuclear project in the US is a reality. On the other hand, the prospects are not so remote that it is in the realm of fantasy. The authors think that if US companies have the opportunity to supply and build Advanced Nuclear Plants of US design outside the US, then the first US nuclear project has a chance to be economically competitive in the US. If these are built on budget and schedule, it will demonstrate to potential lenders that financing nuclear projects in the US does not represent an undue risk. The support of the US government in the export market is vital. Without the concerted effort of the government, including Department of Commerce, Department of State and the US ExIm bank, US suppliers will be at a significant disadvantage when facing international competition for orders. The authors think it is in the best interest of the government to supply such support. Nuclear projects outside the US sustains and creates high tech jobs in the US. It maintains the health of US nuclear technology which generates over 20% of the electricity in the US. Finally, it gives the US influence over the direction of nuclear programs in other countries, particularly developing countries which are intent upon increasing their use of nuclear energy. Those opposed to nuclear energy articulate a future that does not include its use. It is vital that nuclear professionals articulate a future that does include nuclear energy and its many socioeconomic benefits

  15. US heat pump research and development projects, 1976-1986

    Energy Technology Data Exchange (ETDEWEB)

    Zimmerman, K.H.

    1987-04-01

    This document, which is an updated version of US Heat Pump Research and Development Projects, published in August 1982 by the US Department of Energy, is a compilation of one-page summaries and publication and patent information for 233 individual research and development projects on heat pumps covering the years 1976 through 1986. The majority of the projects refer to heat pumps in space-conditioning applications. The document is intended to include information on all projects in the United States for which results are publicly available. Ten different indexes are included to aid the reader in locating specific projects.

  16. Photovoltaic projects for decentralized power supply in India: A financial evaluation

    International Nuclear Information System (INIS)

    Nouni, M.R.; Mullick, S.C.; Kandpal, T.C.

    2006-01-01

    The present study concentrates on photovoltaic (PV) projects for providing decentralized power supply in remote locations in India. Results of a techno-economic evaluation are presented. Some PV projects in the capacity range 1-110 kW p , that have either been implemented or are under implementation, have been considered. An analysis of the capital cost of the PV projects and sub-systems has been undertaken. Levelized unit cost of electricity (LUCE) has been estimated for eighteen select locations situated in different geographical regions of the country. The LUCE is found to vary in the range of Rs. 28.31-59.16/kW h (US$ 0.65-1.35/k Wh) for PV projects in the capacity range 1-25 kW p . In view of high unit cost of electricity from PV projects, need for financial incentives has been examined from the perspective of users. A sensitivity analysis has also been undertaken

  17. Photovoltaic projects for decentralized power supply in India: A financial evaluation

    International Nuclear Information System (INIS)

    Nouni, M.R.; Mullick, S.C.; Kandpal, T.C.

    2006-01-01

    The present study concentrates on photovoltaic (PV) projects for providing decentralized power supply in remote locations in India. Results of a techno-economic evaluation are presented. Some PV projects in the capacity range 1-110 kW p , that have either been implemented or are under implementation, have been considered. An analysis of the capital cost of the PV projects and sub-systems has been undertaken. Levelized unit cost of electricity (LUCE) has been estimated for eighteen select locations situated in different geographical regions of the country. The LUCE is found to vary in the range of Rs. 28.31-59.16/kW h (US$ 0.65-1.35/k Wh) for PV projects in the capacity range 1-25 kW p . In view of high unit cost of electricity from PV projects, need for financial incentives has been examined from the perspective of users. A sensitivity analysis has also been undertaken. (Author)

  18. Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

    Energy Technology Data Exchange (ETDEWEB)

    Kosonen, M.; Hakola, M. [Teollisuuden Voima Oyj, F- 27160 Eurajoki (Finland)

    2012-07-01

    Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to the program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the

  19. Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

    International Nuclear Information System (INIS)

    Kosonen, M.; Hakola, M.

    2012-01-01

    Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to the program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the

  20. Time for Decarbonization of Conservation and Development Projects? The Political Ecology of Carbon Projects

    Directory of Open Access Journals (Sweden)

    Pierre L. Ibisch

    2015-01-01

    Full Text Available The globe's first carbon projects were designed and implemented approximately 20 years ago following scientific insights that emissions of greenhouse gases needed to be mitigated. Visible in some of these early projects were the important aspects of social governance and local benefit sharing. The projects promised to be a panacea to environmental, social and economic problems in remote rural areas of developing countries. However, it took another decade before a wave of hundreds of carbon projects were launched. Many of the projects were offered under the mechanism of REDD+ (Reducing Emissions from Deforestation and forest Degradation, plus the role of conservation, sustainable forest management and carbon enhancement, as well as under a variety of voluntary schemes and national programs, public-private partnerships, and forestry-based investment initiatives. As decision-makers prepare the Conference of the Parties of the United Nations Framework Convention on Climatic Change in Paris (COP21, Earthscan has released a book entitled `Carbon conflicts and forest landscapes in Africa', edited by Melissa Leach and Ian Scoones. According to the editors, the focus of the book is on what happens on the ground when carbon forestry projects arrive, what types of projects work, and, equally important, what doesn’t work.

  1. NPP Cernavoda Unit 2 Financing Completion Works

    International Nuclear Information System (INIS)

    Chirica, T.; Stefanescu, A.; Constantin, C.; Dobrin, M.

    2002-01-01

    NPP Cernavoda Unit 2 completion is the highest priority of the Romanian power sector strategy. The nuclear energy represents, through its technological features of adopted solution (a CANDU nuclear power plant) and also through technological and economical performance indicators, the best solution to fulfill the demands concerning the sustainable development and the electricity request. The guidelines of energy strategy regarding the nuclear sector development in Romania are framing in the general policy for energy system development at least costs and they are responding to requests concerning the environment and people protection. The paper presents the financing alternatives for Unit 2 completion works taking into consideration the financing market conditions. The paper presents the impact of the financing conditions on the project efficiency, as well as the facilities offered by the Romanian Government in order to support this project. (author)

  2. Campaign to counter a deteriorating consumer market: Philip Morris's Project Sunrise.

    Science.gov (United States)

    Givel, M

    2013-02-01

    From 1997 to 2000, Philip Morris implemented Project Sunrise. This paper discusses the impact of this project on national and Philip Morris's cigarette unit sales, public opinion about smoking and secondhand tobacco smoke, and national prevalence trends for tobacco use. A qualitative archival content analysis of Project Sunrise from 1997 to 2000, and a descriptive statistical analysis of cigarette unit sales and operating profits, acceptability of smoking and secondhand tobacco smoke, and national prevalence trends for tobacco use from 1996 to 2006. Qualitative data sources related to Project Sunrise found on WebCat, Pubmed.com, LexisNexis Academic and Philip Morris's website, and archived tobacco industry documents were analysed using NVivo Version 9.0. A descriptive statistical analysis of cigarette unit sales, public opinion about smoking and secondhand tobacco smoke, and national prevalence trends for tobacco use was undertaken. Project Sunrise was a high-level strategic corporate plan to maintain profits that included four possible scenarios resulting in seven interwoven strategies. However, national prevalence rates for tobacco use declined, sales of national and Philip Morris cigarettes declined, operating profits remained at substantially lower levels after 2000 from 2001 to 2006, and a large majority of Americans agreed that there were significant health dangers associated with smoking and secondhand tobacco smoke. The impact of Project Sunrise, including countering the anti-tobacco movement, was less than successful in the USA. Copyright © 2012 The Royal Society for Public Health. Published by Elsevier Ltd. All rights reserved.

  3. The CIEMAT’s forensic analyses of Fukushima accident: Contribution to the BSAF project

    Energy Technology Data Exchange (ETDEWEB)

    Herranz, L.E.; López, C.; Fontanet, J.; Fernández, E.

    2015-07-01

    The Fukushima accident is being both a unique opportunity and a huge challenge for severe accident analysis. Through the simulation of the accidents in Units 1 through 3 with MELCOR 2.1, three scenarios have been postulated which outcomes look consistent with data. These analyses indicate that a massive core damage should have happened in Unit 1, with most core molten and located in the containment, whereas Units 2 and 3 core damage is anticipated to be much less; however, there might be differences among these “twin” units. Anyway, in all the units the amount of H2 produced is over 500 kg. This work has been carried out in the frame of the international project for the understanding of the severe accidents occurred at Fukushima, the OECD-BSAF project. (Author)

  4. Patient-centred hand hygiene information in orthopaedics units: an evidence-based implementation project.

    Science.gov (United States)

    Ong, Arielle Yi Jia; Tan, Joanne; Yeo, Hui Ling; Goh, Mien Li

    2017-03-01

    This project aimed to improve patients' knowledge on the importance of hand hygiene. It involved providing patients with a patient and family education on the importance of hand hygiene using a patient information leaflet that introduces the rationale of hand hygiene, possible consequences of poor hand hygiene, and the seven steps of hand hygiene. This projected used a preimplementation and postimplementation audit strategy using the Joanna Briggs Institute Practical Application of Clinical Evidence System and Getting Research Into Practice programs. The implementation occurred in three phases over a period of 6 months from January 2014 to June 2014. The audits took place in two orthopaedic wards in a large acute care setting tertiary hospital in Singapore and involved a sample size of 54 patients. It involved going through the medical records of the cases, assessment of patient knowledge based on the audit criteria, and checking if the patients received the patient information leaflet on hand hygiene. The postimplementation audit found significant improvements in all three audit criteria. The percentage of patients who demonstrated knowledge in the importance of hand hygiene saw an improvement of 48.1%. There was an improvement of 44.5% in nurses' compliance to the documentation of patient education being carried out. The percentage of patients who received a patient information leaflet on hand hygiene saw an increase of 36.1%. This project demonstrated that a preimplementation and postimplementation audit is a viable method to implement change and translate evidence into practice. Through this project, patients gained an understanding on the importance of hand hygiene and could take better ownership of their well being. This may potentially improve hospitalization experience and benefit health outcomes. The positive results of this project are contributed by the enthusiastic involvement of all the stakeholders, from patients and their caregivers to the bedside

  5. Half Moon Cove Tidal Project. Feasibility report

    Energy Technology Data Exchange (ETDEWEB)

    1980-11-01

    The proposed Half Moon Cove Tidal Power Project would be located in a small cove in the northern part of Cobscook Bay in the vicinity of Eastport, Maine. The project would be the first tidal electric power generating plant in the United States of America. The basin impounded by the barrier when full will approximate 1.2 square miles. The average tidal range at Eastport is 18.2 feet. The maximum spring tidal range will be 26.2 feet and the neap tidal range 12.8 feet. The project will be of the single pool-type single effect in which generation takes place on the ebb tide only. Utilizing an average mean tidal range of 18.2 feet the mode of operation enables generation for approximately ten and one-half (10-1/2) hours per day or slightly in excess of five (5) hours per tide. The installed capacity will be 12 MW utilizing 2 to 6 MW units. An axial flow, or Bulb type of turbine was selected for this study.

  6. KPMU projects. Current environmental situation and expected developments

    International Nuclear Information System (INIS)

    Ribarska, T.

    2010-01-01

    The following KPMU projects are described: Dry storage facility, which will allow the dry storage of 5256 fuel assemblies, currently stored in the spent fuel ponds of reactors of Units 3,4 and the WSF; Projects for equipment and activities related to management of liquid RAW which is already have being implemented on the site and are therefore covered in the current KNPP EIA; Ion Exchange Resin retrieval and Conditioning Equipment; Plasma melting facility; Facility for Retrieval and Processing of The Solidified Phase from Evaporator Concentrate Tanks; Control of Liquid and Gaseous Releases for the Units under Decommissioning at KNPP; Size Reduction and Decontamination Active Workshop –Design, Construction and Equipment Supply and Installation; Supply of: dismantling, size reduction and decontamination tools and equipment; Infrastructure and security perimeter separation; Heat generation plant; EIA for Decommissioning of units 1 to 4; Decay Storage Site for Transitional RAW; Site for Conventional Waste from Decommissioning; Inventory, Treatment and Conditioning of Contaminated Soils; Waste Backlog Treatment

  7. Admiralty Inlet Pilot Tidal Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Collar, Craig [Public Utility District No. 1 of Snohomish County, Everett, WA (United States)

    2015-09-14

    This document represents the final report for the Admiralty Inlet Pilot Tidal Project, located in Puget Sound, Washington, United States. The Project purpose was to license, permit, and install a grid-connected deep-water tidal turbine array (two turbines) to be used as a platform to gather operational and environmental data on tidal energy generation. The data could then be used to better inform the viability of commercial tidal energy generation from technical, economic, social, and environmental standpoints. This data would serve as a critical step towards the responsible advancement of commercial scale tidal energy in the United States and around the world. In late 2014, Project activities were discontinued due to escalating costs, and the DOE award was terminated in early 2015. Permitting, licensing, and engineering design activities were completed under this award. Final design, deployment, operation, and monitoring were not completed. This report discusses the results and accomplishments achieved under the subject award.

  8. Project-based organizing and strategic management

    DEFF Research Database (Denmark)

    very different industries such as management consulting, engineering or entertainment. Contributors analyze PBOs as firms, units or networks of firms set up to complete a specific assignment, as well as address the evolution from traditional operations-driven project management, to the strategic role...

  9. Clinch River breeder project gets boost

    International Nuclear Information System (INIS)

    Hill, W.H.

    1982-01-01

    Progress on the Clinch River Breeder Reactor Plant project, the United States' next step in developing liquid metal fast breeder technology is examined including consideration of Plant design, component fabrication and testing, construction schedule, funding, fuel cycle development and licensing. (U.K.)

  10. Inventory of power plants in the United States. [By state within standard Federal Regions, using county codes

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-12-01

    The purpose of this inventory of power plants is to provide a ready reference for planners whose focus is on the state, standard Federal region, and/or national level. Thus the inventory is compiled alphabetically by state within standard Federal regions. The units are listed alphabetically within electric utility systems which in turn are listed alphabetically within states. The locations are identified to county level according to the Federal Information Processing Standards Publication Counties and County Equivalents of the States of the United States. Data compiled include existing and projected electrical generation units, jointly owned units, and projected construction units.

  11. 24 CFR 206.51 - Eligibility of mortgages involving a dwelling unit in a condominium.

    Science.gov (United States)

    2010-04-01

    ... a dwelling unit in a condominium. 206.51 Section 206.51 Housing and Urban Development Regulations...; Endorsement Eligible Properties § 206.51 Eligibility of mortgages involving a dwelling unit in a condominium. If the mortgage involves a dwelling unit in a condominium, the project in which the unit is located...

  12. Future wave and wind projections for United States and United-States-affiliated Pacific Islands

    Science.gov (United States)

    Storlazzi, Curt D.; Shope, James B.; Erikson, Li H.; Hegermiller, Christine A.; Barnard, Patrick L.

    2015-01-01

    Changes in future wave climates in the tropical Pacific Ocean from global climate change are not well understood. Spatially and temporally varying waves dominate coastal morphology and ecosystem structure of the islands throughout the tropical Pacific. Waves also impact coastal infrastructure, natural and cultural resources, and coastal-related economic activities of the islands. Wave heights, periods, and directions were forecast through the year 2100 using wind parameter outputs from four atmosphere-ocean global climate models from the Coupled Model Inter-Comparison Project, Phase 5, for Representative Concentration Pathways (RCP) scenarios 4.5 and 8.5 that correspond to moderately mitigated and unmitigated greenhouse gas emissions, respectively. Wind fields from the global climate models were used to drive a global WAVEWATCH-III wave model and generate hourly time-series of bulk wave parameters for 25 islands in the mid to western tropical Pacific for the years 1976–2005 (historical), 2026–2045 (mid-century projection), and 2085–2100 (end-of-century projection). Although the results show some spatial heterogeneity, overall the December-February extreme significant wave heights, defined as the mean of the top 5 percent of significant wave height time-series data modeled within a specific period, increase from present to mid-century and then decrease toward the end of the century; June-August extreme wave heights increase throughout the century within the Central region of the study area; and September-November wave heights decrease strongly throughout the 21st century, displaying the largest and most widespread decreases of any season. Peak wave periods increase east of the International Date Line during the December-February and June-August seasons under RCP4.5. Under the RCP8.5 scenario, wave periods decrease west of the International Date Line during December-February but increase in the eastern half of the study area. Otherwise, wave periods decrease

  13. CSNI Project for Fracture Analyses of Large-Scale International Reference Experiments (Project FALSIRE)

    International Nuclear Information System (INIS)

    Bass, B.R.; Pugh, C.E.; Keeney-Walker, J.; Schulz, H.; Sievers, J.

    1993-06-01

    This report summarizes the recently completed Phase I of the Project for Fracture Analysis of Large-Scale International Reference Experiments (Project FALSIRE). Project FALSIRE was created by the Fracture Assessment Group (FAG) of Principal Working Group No. 3 (PWG/3) of the Organization for Economic Cooperation and Development (OECD)/Nuclear Energy Agency's (NEA's) Committee on the Safety of Nuclear Installations (CSNI). Motivation for the project was derived from recognition by the CSNI-PWG/3 that inconsistencies were being revealed in predictive capabilities of a variety of fracture assessment methods, especially in ductile fracture applications. As a consequence, the CSNI/FAG was formed to evaluate fracture prediction capabilities currently used in safety assessments of nuclear components. Members are from laboratories and research organizations in Western Europe, Japan, and the United States of America (USA). On behalf of the CSNI/FAG, the US Nuclear Regulatory Commission's (NRC's) Heavy-Section Steel Technology (HSST) Program at the Oak Ridge National Laboratory (ORNL) and the Gesellschaft fuer Anlagen--und Reaktorsicherheit (GRS), Koeln, Federal Republic of Germany (FRG) had responsibility for organization arrangements related to Project FALSIRE. The group is chaired by H. Schulz from GRS, Koeln, FRG

  14. CSNI Project for Fracture Analyses of Large-Scale International Reference Experiments (Project FALSIRE)

    Energy Technology Data Exchange (ETDEWEB)

    Bass, B.R.; Pugh, C.E.; Keeney-Walker, J. [Oak Ridge National Lab., TN (United States); Schulz, H.; Sievers, J. [Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH, Koeln (Gemany)

    1993-06-01

    This report summarizes the recently completed Phase I of the Project for Fracture Analysis of Large-Scale International Reference Experiments (Project FALSIRE). Project FALSIRE was created by the Fracture Assessment Group (FAG) of Principal Working Group No. 3 (PWG/3) of the Organization for Economic Cooperation and Development (OECD)/Nuclear Energy Agency`s (NEA`s) Committee on the Safety of Nuclear Installations (CSNI). Motivation for the project was derived from recognition by the CSNI-PWG/3 that inconsistencies were being revealed in predictive capabilities of a variety of fracture assessment methods, especially in ductile fracture applications. As a consequence, the CSNI/FAG was formed to evaluate fracture prediction capabilities currently used in safety assessments of nuclear components. Members are from laboratories and research organizations in Western Europe, Japan, and the United States of America (USA). On behalf of the CSNI/FAG, the US Nuclear Regulatory Commission`s (NRC`s) Heavy-Section Steel Technology (HSST) Program at the Oak Ridge National Laboratory (ORNL) and the Gesellschaft fuer Anlagen--und Reaktorsicherheit (GRS), Koeln, Federal Republic of Germany (FRG) had responsibility for organization arrangements related to Project FALSIRE. The group is chaired by H. Schulz from GRS, Koeln, FRG.

  15. A comprehensive cooperative project for children with renal diseases in Nicaragua.

    Science.gov (United States)

    Edefonti, A; Marra, G; Castellón Perez, M; Sandoval Díaz, M; Sereni, F

    2010-11-01

    In low-income countries renal diseases generally and chronic kidney disease (CKD) in particular represent a wide-spread and often underdiagnosed clinical problem. The aim of the cooperative project between the pediatric nephrology units of Milan, Italy, and Managua, Nicaragua was to improve the diagnosis and treatment of renal diseases and CKD in Nicaraguan children. When the project started, in 2000, there were many constraints in human and material resources in the Children's Hospital in Managua. Since 2001, a specialized Unit of Pediatric Nephrology and Urology has developed, offering free of charge basic clinical assistance to hospitalized children, and training abroad of the whole staff. Shared protocols, renovation of infrastructure and an information technology (IT) program were implemented. In 2003, renal replacement therapy (RRT) for selected children was initiated, along with a network of six department hospitals in 2005 and, in 2007, a CKD prevention program in the most peripheral Health Units, so that 61% of the Nicaraguan pediatric population is now covered by the project. To ensure implementation of the project, applications for funds to Italian private and public institutions were made and a Nicaraguan charity foundation was activated. The Nicaraguan Ministry of Health and the hospital directors were always involved in the plans of the development of the project and accepted the progressive transfer of the costs to the government, throughout the 9-year duration of the project. The IT program, inclusive of a database of children with kidney and other urinary tract (UT) diseases and a web connection between Milan and Managua, was crucial in monitoring the activities and providing epidemiological data, in order to better allocate resources. The clinical activities and the number of children managed in Managua in 2008 are similar to those of pediatric nephrology units worldwide and depict the level of clinical autonomy achieved. The sister-center model

  16. An introduction to the installation of Unit 5 at Revelstoke Generating Station

    International Nuclear Information System (INIS)

    1994-07-01

    The Revelstoke hydroelectric power plant in British Columbia has four generating units with a total capacity of 1843 MW. The plant was designed as a six-unit facility, with space provided in the powerhouse for two additional units in Bays 5 and 6. It is proposed to install a fifth unit at Revelstoke, which will increase capacity by ca 460 MW. No additional land or transmission facilities will be required for this project, whose estimated direct construction cost is $90 million. The new unit is felt to be needed because of anticipated capacity shortfalls that could occur on the British Columbia Hydro system as early as 1996 or as late as 2004. Preliminary engineering and environmental studies are reviewed, and the public consultation program and procurement plan for the project are outlined. Potential impacts on land use and heritage resources appear negligible, and recreation use of Revelstoke Reservoir is not expected to be significantly impacted. Changes in reservoir fluctuations with Unit 5 in place will be minimal. 4 figs

  17. Safety evaluation report related to the operation of South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499)

    International Nuclear Information System (INIS)

    1987-01-01

    In April 1986 staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0781) regarding the application of Houston Lighting and Power Company (applicant and agent for the owners) for a license to operate South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499). The facility is located in Matagorda County, Texas, west of the Colorado River, 8 miles north-northwest of the town of Matagorda and about 89 miles southwest of Houston. The first supplement to NUREG-0781 was issued in September 1986. This second supplement reports on the status of unresolved items in the Safety Evaluation Report and identifies certain additional items that have since been reviewed by the staff

  18. Project management skills for nuclear power plants

    International Nuclear Information System (INIS)

    Bhatikar, R.J.

    2002-01-01

    Full text: The E and C Division of L and T has executed several power projects in India and abroad and thus possesses the requisite wherewithal to execute nuclear power projects on a fast track basis. To achieve this L and T has set up a separate Strategic Business Unit (SBU) to have a focused attention to the nuclear power industry in the country. All the four important and necessary hallmarks for successful implementation of any project namely (i) engineering capabilities, (ii) sophisticated project management tools, (iii) ability to mobilize resources, and (iv) skilled personnel to execute the project have been adequately addressed. These could be realized either by establishing fruitful collaborations with other specialist Companies and/or creating powerful and multitasking software tools for effective implementation. The execution of nuclear power projects on a fast track basis could be implemented by following the EPC route and by minimizing the number of packages. Details of this scheme for project implementation will be highlighted during the talk

  19. An exploratory study on the building information modeling adoption in United Arab Emirates municipal projects- current status and challenges

    Directory of Open Access Journals (Sweden)

    Venkatachalam Senthilkumar

    2017-01-01

    Full Text Available Many modern complex building projects in the public and private sectors are characterized by its poor information management which is manifested by time and cost overruns around the world. Building Information Modelling (BIM is currently being adopted around the world with various countries mandated its implementation. In specific, the implementation of BIM is rapidly growing in developed countries such as USA, UK, Singapore and Australia, with government mandate through devising strategies and initiatives to increase the adoption. The implementation of BIM in United Arab Emirates (UAE and other developing countries lags behind due to the existence of numerous implementation barriers. This study explores the current status of BIM implementation in the UAE municipalities, further explores the people, process and technology readiness towards BIM adoption in the UAE building projects. Further the study also explores the current challenges against the BIM adoption. The study adopts a positivists approach by collecting data through questionnaires, a sample of sixty participants across the UAE municipalities from different states were selected randomly to acquire the data. The collected data is statistically analyzed to obtain the findings. The analysis results showed that there are inadequate people and process related readiness towards BIM adoption whereas the technology readiness does exist. The same also was reflected in further analysis on BIM adoption barriers as the challenges. Further the paper also discusses the possible strategies adopted around the world through literature to address the explored challenges in the study

  20. Project Leadership Lived Experiences with Web-Based Social Networking: A Phenomenological Study

    Science.gov (United States)

    Scroggins, Charles W.

    2010-01-01

    This study explores the lived experiences of project leaders adopting and using Web-2.0 social networking collaboration applications for their project leadership activities. The experiences of 20 project leaders in a Fortune 500 aerospace and defense enterprise in the northeastern United States of America were explored using a qualitative…

  1. New projects related to decommissioning

    International Nuclear Information System (INIS)

    Benbow, R.

    2008-01-01

    The PMU has been established in support of the KNPP Decommissioning Department. All of the Infrastructure Projects associated with Decommissioning have been identified and are being managed through the EBRD Procurement Process. The status of the following projects is presented: Evaluation of the Radiological Inventory for Units 1 to 4; Supply of Size Reduction and Decontamination Workshops; Dismantling Tools and Equipment; Heat Generation Plant; Environmental Assessment for Decommissioning; Decay Storage Site for Transitional RAW ; Information Centres for Decommissioning; Storage Site for Conventional Waste from Decommissioning; Inventory, Treatment an Conditioning of Contaminated Soil; Concrete Core Sampling Analysis; Asbestos Removal Equipment; Demolition Equipment

  2. Safety evaluation report related to the construction of Skagit/Hanford Nuclear Project, Units 1 and 2. Docket Nos. STN 50-522 and 50-523

    International Nuclear Information System (INIS)

    1982-12-01

    Supplement 3 to the Safety Evaluation Report for the application filed by Puget Sound Power and Light Company on behalf of itself, the Pacific Power and Light Company, The Washington Water Power Company, and the Portland General Electric Company for construction permits to build the Skagit/Hanford Nuclear Project has been issued by the Office of Nuclear Reactor Regulation of the United States Nuclear Regulatory Commission. This supplement is an evaluation of the site relocation amendment to the Preliminary Safety Analysis Report. The proposed site has been relocated from Skagit County, Washington, to the Department of Energy's Hanford Reservation

  3. Change management methodologies trained for automotive infotainment projects

    Science.gov (United States)

    Prostean, G.; Volker, S.; Hutanu, A.

    2017-01-01

    An Automotive Electronic Control Units (ECU) development project embedded within a car Environment is constantly under attack of a continuous flow of modifications of specifications throughout the life cycle. Root causes for those modifications are for instance simply software or hardware implementation errors or requirement changes to satisfy the forthcoming demands of the market to ensure the later commercial success. It is unavoidable that from the very beginning until the end of the project “requirement changes” will “expose” the agreed objectives defined by contract specifications, which are product features, budget, schedule and quality. The key discussions will focus upon an automotive radio-navigation (infotainment) unit, which challenges aftermarket devises such as smart phones. This competition stresses especially current used automotive development processes, which are fit into a 4 Year car development (introduction) cycle against a one-year update cycle of a smart phone. The research will focus the investigation of possible impacts of changes during all phases of the project: the Concept-Validation, Development and Debugging-Phase. Building a thorough understanding of prospective threats is of paramount importance in order to establish the adequate project management process to handle requirement changes. Personal automotive development experiences and Literature review of change- and configuration management software development methodologies led the authors to new conceptual models, which integrates into the structure of traditional development models used in automotive projects, more concretely of radio-navigation projects.

  4. The integrated project SOFC600 development of low-temperature SOFC

    DEFF Research Database (Denmark)

    Rietveld, B.; Van Berkel, F.; Zhang-Steenwinkel, Y.

    2009-01-01

    The Integrated Project SOFC600 unites 21 partners jointly working on the research and development of SOFC stack components for operation at 600oC. The project is funded by the European Commission within the 6th Framework Programme. Low-temperature operation is considered essential for achieving c...

  5. Tungsten covered graphite and copper elements and ITER-like actively cooled tungsten divertor plasma facing units for the WEST project

    International Nuclear Information System (INIS)

    Guilhem, D; Bucalossi, J; Burles, S; Corre, Y; Ferlay, F; Firdaouss, M; Languille, P; Lipa, M; Martinez, A; Missirlian, M; Proust, M; Richou, M; Samaille, F; Tsitrone, E

    2016-01-01

    After a brief introduction giving some insight of the WEST project, we present the three types of plasma facing units (PFUs) developed for the WEST project taking into account the envisaged main scenarios: (1) high power short pulse scenario (a few seconds) where the objective is to maximize the power handling of the PFUs, up to 20 MW m −2 , (2) high fluence scenario (a few 100 s) on actively cooled ITER-like tungsten (W) PFUs, up to 10 MW m −2 during 1000 s. For the graphite PFUs, the high heat flux tests have been done at GLADIS (ion beam test facility), and for the CuCrZr PFUs on the JUDITH (electron beam test facility). The tests were successful, as no damage occurred for the different load cases. This confirms that the modelling done during the design phase is appropriate to describe these PFUs. Series productions are expected to be achieved by the end of 2015 for the graphite and CuCrZr PFUs, and few ITER-like W PFUs are expected at the beginning of 2016. The lower divertor will be complemented with ITER-like W PFUs as soon as available from our partners so that different fabrication procedures could be evaluated in a real industrial process and a real tokamak environment. (paper)

  6. [Quality of life and life project, two inseparable concepts?].

    Science.gov (United States)

    Deconstanza, Patrice

    2010-01-01

    The construction of a life project within a long-stay unit for people living with chronic psychiatric disorders must take into account a dimension of care centred around the quality of life and the care provided "here and now". Here, the concept of care finds its full meaning. The example of a long-stay psychiatric unit.

  7. Functional Analysis of Kori Unit 1

    International Nuclear Information System (INIS)

    Choi, Seong Soo; Han, Jeong Hyun; Heo, Tae Young

    2009-07-01

    Function Analysis of Kori Unit 1 has been performed as a part of independent human factors review tasks for control room renovation of the plant. The top level goal defined for the scope of function analysis is 'Generate Electricity'. Through this function analysis of Kori Unit 1, the detailed sub-functions extracted from the existing design documents and procedures, functional relationships among the high level functions, functional classification of each hierarchical level, and tree diagrams of the hierarchical function structures of the plant were developed and identified as the result of the project. In addition, we investigated and compiled the specifications of MMIS devices used in Ulchin Nuclear Power Plant Unit 5,6 in accordance with the request from KAERI. The results of those researches will be used as basis data for independent review of the control room MMIS design of the Kori Unit 1

  8. Efficient erection of a piping unit in a nuclear power station

    International Nuclear Information System (INIS)

    Halstrick, V.; Peters, G.

    1986-01-01

    In consideration of the negative experience gathered in the past extensive project logistics are required for the erection of piping units in a nuclear power station in order to be able to recognize and master the numerous influences and different marginal conditions with reasonable certainty and at an early stage. The utilization of requirements from the analysis of experience for the conception of project management begins with the erection planning and results in check lists for the execution of erection. During production planning these check lists are verified for realization. Because of the extensive data, EDP-aided systems are applied for checking and controlling the flow of information and material. A dialogue-aided system is presented for project planning and controlling which enables a transparent and farsighted execution of a project. By means of comparable piping units it is demonstrated that due to the created controlling system a great success becomes obvious in relation to the past. (orig.) [de

  9. bayesPop: Probabilistic Population Projections

    Directory of Open Access Journals (Sweden)

    Hana Ševčíková

    2016-12-01

    Full Text Available We describe bayesPop, an R package for producing probabilistic population projections for all countries. This uses probabilistic projections of total fertility and life expectancy generated by Bayesian hierarchical models. It produces a sample from the joint posterior predictive distribution of future age- and sex-specific population counts, fertility rates and mortality rates, as well as future numbers of births and deaths. It provides graphical ways of summarizing this information, including trajectory plots and various kinds of probabilistic population pyramids. An expression language is introduced which allows the user to produce the predictive distribution of a wide variety of derived population quantities, such as the median age or the old age dependency ratio. The package produces aggregated projections for sets of countries, such as UN regions or trading blocs. The methodology has been used by the United Nations to produce their most recent official population projections for all countries, published in the World Population Prospects.

  10. bayesPop: Probabilistic Population Projections

    Science.gov (United States)

    Ševčíková, Hana; Raftery, Adrian E.

    2016-01-01

    We describe bayesPop, an R package for producing probabilistic population projections for all countries. This uses probabilistic projections of total fertility and life expectancy generated by Bayesian hierarchical models. It produces a sample from the joint posterior predictive distribution of future age- and sex-specific population counts, fertility rates and mortality rates, as well as future numbers of births and deaths. It provides graphical ways of summarizing this information, including trajectory plots and various kinds of probabilistic population pyramids. An expression language is introduced which allows the user to produce the predictive distribution of a wide variety of derived population quantities, such as the median age or the old age dependency ratio. The package produces aggregated projections for sets of countries, such as UN regions or trading blocs. The methodology has been used by the United Nations to produce their most recent official population projections for all countries, published in the World Population Prospects. PMID:28077933

  11. Automated metadata--final project report

    Energy Technology Data Exchange (ETDEWEB)

    Schissel, David [General Atomics, San Diego, CA (United States)

    2016-04-01

    This report summarizes the work of the Automated Metadata, Provenance Cataloging, and Navigable Interfaces: Ensuring the Usefulness of Extreme-Scale Data Project (MPO Project) funded by the United States Department of Energy (DOE), Offices of Advanced Scientific Computing Research and Fusion Energy Sciences. Initially funded for three years starting in 2012, it was extended for 6 months with additional funding. The project was a collaboration between scientists at General Atomics, Lawrence Berkley National Laboratory (LBNL), and Massachusetts Institute of Technology (MIT). The group leveraged existing computer science technology where possible, and extended or created new capabilities where required. The MPO project was able to successfully create a suite of software tools that can be used by a scientific community to automatically document their scientific workflows. These tools were integrated into workflows for fusion energy and climate research illustrating the general applicability of the project’s toolkit. Feedback was very positive on the project’s toolkit and the value of such automatic workflow documentation to the scientific endeavor.

  12. International assistance. Licensing assistance project

    International Nuclear Information System (INIS)

    Aleev, A.

    1999-01-01

    Description of licensing assistance project for VATESI is presented. In licensing of unit No.1 of INPP VATESI is supported by many western countries. Experts from regulatory bodies or scientific organizations of those countries assist VATESI staff in reviewing documentation presented by INPP. Among bilateral cooperation support is provided by European Commission through Phare programme

  13. The Darfur Atrocities Documentation Project

    Science.gov (United States)

    Totten, Samuel

    2004-01-01

    One of the many important aspects of the Darfur Atrocities Documentation Project was that it set a precedent for what the U.S. and/or other nations can, and should do, when future cases of potential genocide arise. Far too often in the recent past, the international community (the United Nations, individual governments, many nongovernmental…

  14. Unit Testing for Command and Control Systems

    Science.gov (United States)

    Alexander, Joshua

    2018-01-01

    Unit tests were created to evaluate the functionality of a Data Generation and Publication tool for a command and control system. These unit tests are developed to constantly evaluate the tool and ensure it functions properly as the command and control system grows in size and scope. Unit tests are a crucial part of testing any software project and are especially instrumental in the development of a command and control system. They save resources, time and costs associated with testing, and catch issues before they become increasingly difficult and costly. The unit tests produced for the Data Generation and Publication tool to be used in a command and control system assure the users and stakeholders of its functionality and offer assurances which are vital in the launching of spacecraft safely.

  15. Managing Natural Resources for Sustainable Livelihoods: Uniting ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2003-07-31

    Jul 31, 2003 ... Management of local resources has a greater chance of a ... Managing Natural Resources for Sustainable Livelihoods: Uniting Science and Participation ... innovative approaches for establishing and sustaining participation and ... A new IDRC-supported project will help improve water conservation and ...

  16. Bidding Strategy to Support Decision-Making Based on Comprehensive Information in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ru Liang

    2016-01-01

    Full Text Available This paper develops a unified method to support contractor for bidding selection in construction projects. A cross-functional contractor with 28 candidate units distributed in the three departments (construction units, design units, and suppliers is used as an example. This problem is first formulated as a 0-1 quadratic programming problem through optimizing individual performance and collaborative performance of the candidate units based on individual information and collaborative information. Then, a multiobjective evolutionary algorithm is designed to solve this problem and a bidding selection problem for a major bridge project is used to demonstrate our proposed method. The results show that the decision-maker (DM obtains a better contractor if he pays more attention to collaborative performance.

  17. Dementia care worker stress associations with unit type, resident, and work environment characteristics: a cross-sectional secondary data analysis of the Swiss Nursing Homes Human Resources Project (SHURP).

    Science.gov (United States)

    Vogel, Barbara; De Geest, Sabina; Fierz, Katharina; Beckmann, Sonja; Zúñiga, Franziska

    2017-03-01

    Although caring for residents with dementia in nursing homes is associated with various stressors for care workers, the role of the unit type, and particularly the proportion of residents with dementia, remains unclear. This study aimed to explore associations between unit type and care worker stress, taking into account additional potential stressors. This cross-sectional study was a secondary data analysis in the Swiss Nursing Homes Human Resources Project, which included data from 3,922 care workers from 156 Swiss nursing homes. Care workers' stress was measured with a shortened version of the Health Professions Stress Inventory. Generalized estimating equation models were used to assess care worker stress and its relationships with three unit types (special care units and others with high or low proportions of residents with dementia), work environment factors, and aggressive resident behavior. After including all potential stressors in the models, no significant differences between the three unit types regarding care worker stress were found. However, increased care worker stress levels were significantly related to lower ratings of staffing and resources adequacy, the experience of verbal aggression, and the observation of verbal or physical aggression among residents. Although the unit type plays only a minor role regarding care worker stress, this study confirms that work environment and aggressive behavior of residents are important factors associated with work-related stress. To prevent increases of care worker stress, interventions to improve the work environment and strengthen care workers' ability to cope with aggressive behavior are suggested.

  18. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Appendix A: BP Exploration (Alaska) Inc. Final project description - Revision 1, March 27, 1997

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains Appendix A of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment. This document is the Northstar Development Project, Final Project Description, Revision 1 for BPXA Northstar Project

  19. The neutron radiography unit at Washington State University

    International Nuclear Information System (INIS)

    Ogren, J.W.; Burkhart, D.; Hinman, G.

    1972-01-01

    The WSU neutron radiography unit was developed as a student project, but more recently it has been used by our College of Engineering Research Division in a study of mine wall reinforcement by plastic materials

  20. Virtual classroom project

    OpenAIRE

    Gmeiner, Nicholas

    2017-01-01

    This project aims to provide students with disabilities the same in class learning experience through virtual reality technology, 360-degree video capture, and the use of Arduino units. These technologies will be combined to facilitate communication between teachers in physical classrooms with students in virtual classrooms. The goal is to provide a person who is affected by a disability (which makes it hard to be in a traditional classroom) the same benefits of a safe and interactive learnin...

  1. Light Water Reactor Sustainability Constellation Pilot Project FY11 Summary Report

    International Nuclear Information System (INIS)

    Johansen, R.

    2011-01-01

    Summary report for Fiscal Year 2011 activities associated with the Constellation Pilot Project. The project is a joint effor between Constellation Nuclear Energy Group (CENG), EPRI, and the DOE Light Water Reactor Sustainability Program. The project utilizes two CENG reactor stations: R.E. Ginna and Nine Point Unit 1. Included in the report are activities associate with reactor internals and concrete containments.

  2. Viet Nam. Grade Six, Unit One. 6.1. Comprehensive Social Studies Curriculum for the Inner City.

    Science.gov (United States)

    Thompson, Fred

    This sixth grade unit is one of a sequential learning series of the Focus On Inner City Social Studies (FICSS) project developed in accordance with the needs and problems of an urban society. A description of the project is provided in SO 008 271. The units are designed to help students investigate the conditions under which people in other…

  3. 77 FR 40606 - United Water; Notice of Declaration of Intention and Petition for Relief, and Soliciting Comments...

    Science.gov (United States)

    2012-07-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. DI12-8-000] United Water...: DI12-8-000. c. Date Filed: June 11, 2012. d. Applicant: United Water. e. Name of Project: Arlington... Contact: Jeffrey McDonald, PE, Project Director, Fuss & O'Neill, 146 Hartford Road, Manchester, CT 06040...

  4. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  5. Methodology of impact assessment of research projects

    International Nuclear Information System (INIS)

    Rodriguez Cardona, R.; Cobas Aranda, M.

    2014-01-01

    In the context of the management of research projects development it is necessary to have tools to monitor and evaluate progress and the performance of the projects, as well as their results and the impact on society (international agencies of the United Nations and the States 2002 and 2005 Paris Declaration), with the objective of to ensure their contribution to the social and economic development of countries. Many organizations, agencies and Governments apply different methodologies (IDB, World Bank, UNDP, ECLAC, UNESCO; UNICEF, Canada, Japan, other) for these purposes. In the results-based project management system not only paramount is the process or product itself, but also the result or impact of the project (if the program/project produced the effects desired persons, households and institutions and whether those effects are attributable to the intervention of the program / project). The work shows a methodology that allows for a qualitative and quantitative evaluation of impact of research projects and has been result of experience in project management of international collaboration with the International Agency for Atomic Energy (IAEA) and the Cuban Nuclear programme. (author)

  6. Important projects are being implemented jointly

    International Nuclear Information System (INIS)

    Medeliene, D.

    1998-01-01

    Full text: Sweden is continuing its support to Lithuania in the field of nuclear safety. The major current projects include the testing of gap between graphite and pressure tube measuring device, the pressure tube investigation of material properties, content of hydrogen, microstructure, etc., ALS Structure verification using non-destructive testing, Conceptual study on Leak Before Break, Management seminars for VATESI, Multimedia System for the Ignalina NPP's Information Center and Waste management projects. Some of the projects are partially financed by Ignalina NPP. Sweden and Norway provide financing for the extremely important and expensive project - Physical protection: perimeter around the plant. Two new EC projects, Continuation of support to VATESI: licensing, inservice and decommissioning, and Phare TSO project to help building up TSO competence in Lithuania are no less important. In the beginning of September a functional exercise was organised with the Ignalina NPP emergency preparedness Information unit. This exercise was the second one of the two to prepare the personnel for the problems they have to solve in communication with public and media in the case of an accident at the Ignalina NPP

  7. Study on Top-Down Estimation Method of Software Project Planning

    Institute of Scientific and Technical Information of China (English)

    ZHANG Jun-guang; L(U) Ting-jie; ZHAO Yu-mei

    2006-01-01

    This paper studies a new software project planning method under some actual project data in order to make software project plans more effective. From the perspective of system theory, our new method regards a software project plan as an associative unit for study. During a top-down estimation of a software project, Program Evaluation and Review Technique (PERT) method and analogy method are combined to estimate its size, then effort estimation and specific schedules are obtained according to distributions of the phase effort. This allows a set of practical and feasible planning methods to be constructed. Actual data indicate that this set of methods can lead to effective software project planning.

  8. The Qinshan phase III project-a successful model of sino-canadian cooperation

    International Nuclear Information System (INIS)

    Pang, S.H.H.; Alikhan, S.; Gu Jun

    2005-01-01

    The Qinshan Phase III (CANDU) Project, the largest-scale cooperative project between China and Canada, was completed in 2003 well in advance of the schedule and 10% under budget. The Third Qinshan (Phase III) Nuclear Power Plant (TQNPP) was built in record times: Unit 1 achieved commercial operation on December 31, 2002 and Unit 2 on July 20, 2003, 43 days and 115 days ahead of schedule respectively. Improvements in design and construction methods allowed Unit 1 to be constructed in 51.5 months from First Concrete to Criticality - a record in China for nuclear power plants. The key factors are project management and project management tools, quality assurance, construction methods, electronic documentation with configuration control that provides up-to-date on-line information, CADDS design linked with material management and control. New design and construction techniques were introduced by combining conventional AECL practices with working experiences in China. The most advanced tools and techniques for achieving optimum construction quality, schedule and cost were used. Successful application of advanced project management methods and tools has benefited TQNPC in its subsequent plant operation, and the Chinese contractors in advancing their capabilities in future nuclear projects in China as well as enhancing their opportunities internationally. Excellent co-operation and teamwork within the integrated TQNPC/AECL Commissioning Team with well documented QA program, process and procedures also contributed to the remarkable success of the Project. AECL's initial assessment, based on lessons learned, showed that the project schedule could readily be reduced to 66 months and the capital costs reduced by 25% for a replication project. AECL is building on this experience and successful results of TQNPP in its Advanced CANDU Reactor TM (ACR TM ) ** design. (authors)

  9. Education Projects: Elaboration, Financing and Management. Fundamentals of Educational Planning, No. 38.

    Science.gov (United States)

    Magnen, Andre

    In many developing countries, the translation of political objectives to action projects is made difficult by the lack of training of staff of the ministry of education planning and managing units. This booklet deals with the implementation of these projects within the framework of the planning process. After defining projects, chapter 1 shows the…

  10. Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Connell, Daniel P

    2009-01-12

    The Greenidge Multi-Pollutant Control Project is being conducted as part of the U.S. Department of Energy's Power Plant Improvement Initiative to demonstrate an innovative combination of air pollution control technologies that can cost-effectively reduce emissions of SO{sub 2}, NO{sub x}, Hg, acid gases (SO{sub 3}, HCl, and HF), and particulate matter from smaller coal-fired electrical generating units (EGUs). The multi-pollutant control system includes a hybrid selective non-catalytic reduction (SNCR)/in-duct selective catalytic reduction (SCR) system to reduce NOx emissions by {ge}60%, followed by a Turbosorp{reg_sign} circulating fluidized bed dry scrubber system to reduce emissions of SO{sub 2}, SO{sub 3}, HCl, and HF by {ge}95%. Mercury removal of {ge}90% is also targeted via the co-benefits afforded by the in-duct SCR, dry scrubber, and baghouse and by injection of activated carbon upstream of the scrubber, as required. The technology is particularly well suited, because of its relatively low capital and maintenance costs and small space requirements, to meet the needs of coal-fired units with capacities of 50-300 MWe. There are about 440 such units in the United States that currently are not equipped with SCR, flue gas desulfurization (FGD), or mercury control systems. These smaller units are a valuable part of the nation's energy infrastructure, constituting about 60 GW of installed capacity. However, with the onset of the Clean Air Interstate Rule, Clean Air Mercury Rule, and various state environmental actions requiring deep reductions in emissions of SO{sub 2}, NO{sub x}, and mercury, the continued operation of these units increasingly depends upon the ability to identify viable air pollution control retrofit options for them. The large capital costs and sizable space requirements associated with conventional technologies such as SCR and wet FGD make these technologies unattractive for many smaller units. The Greenidge Project aims to confirm

  11. High School Geography Project. Legacy for the Seventies. An Analysis of the High School Geography Project in Relation to New Developments in Geographic Education Worldwide.

    Science.gov (United States)

    Gunn, Angus M., Ed.

    Nine articles by geographers and educators analyze the High School Geography Project (HSGP). A project overview by Angus Gunn presents essential ideas and content of six units and several preliminary reactions. The question of "HSGP exportability" to France and Germany is examined in articles by Maurice Saint-Yves and Robert Geipel…

  12. Independent Study Project, Topic: Topology.

    Science.gov (United States)

    Notre Dame High School, Easton, PA.

    Using this guide and the four popular books noted in it, a student, working independently, will learn about some of the classical ideas and problems of topology: the Meobius strip and Klein bottle, the four color problem, genus of a surface, networks, Euler's formula, and the Jordan Curve Theorem. The unit culminates in a project of the students'…

  13. A Global Review of Sustainable Construction Project Financing: Policies, Practices, and Research Efforts

    Directory of Open Access Journals (Sweden)

    Ming Shan

    2017-12-01

    Full Text Available Despite the increasing investment in sustainable development over the past decade, a systematic review of sustainable construction project financing is lacking. The objectives of this paper are to conduct a systematic review to examine the policies, practices, and research efforts in the area of sustainable construction project financing, and to explore the potential opportunities for the future research. To achieve these goals, this paper first reviewed the sustainable construction project financing practices implemented by four representative developed economies including the United Kingdom, the United States, Singapore, and Australia. Then, this paper reviewed the efforts and initiatives launched by three international organizations including the United Nations, the Organization for Economic Co-operation and Development, and International Finance Corporation. After that, this paper reviewed the research efforts of sustainable construction project financing published in peer-review journals and books. This paper identified four major research themes within this area, which are the review of financial stakeholders and market of sustainable construction, benefits and barriers to sustainable construction project financing, financial vehicles for sustainable construction projects, innovative models and mechanisms for sustainable construction project financing. Additionally, this paper revealed five directions for the future research of sustainable construction project financing, which are the identification of financial issues in sustainable construction projects, the investigation of financial vehicles for sustainable construction projects in terms of their strengths, limitations, and performances, the examination of critical drivers for implementing sustainable construction project financing, the development of a knowledge-based decision support system for implementing sustainable construction financing, and the development of best practices for

  14. Norms on unitizations of Banach algebras revisited

    Czech Academy of Sciences Publication Activity Database

    Arhippainen, J.; Müller, Vladimír

    2007-01-01

    Roč. 114, č. 2 (2007), s. 201-204 ISSN 0236-5294 R&D Projects: GA ČR GA201/03/0041 Institutional research plan: CEZ:AV0Z10190503 Keywords : regular norm * unitization Subject RIV: BA - General Mathematics Impact factor: 0.366, year: 2007

  15. Cernavoda NPP Unit 1 - a plant of several generations

    International Nuclear Information System (INIS)

    Rotaru, I.; Metes, M.; Anghelescu, M.S.

    2001-01-01

    The paper reflects some key aspects related to the shift of generations during the project's development, including the present stage. Further, the place of Cernavoda NPP Unit 1 in the Romanian power sector and among other nuclear stations in the world is presented. The operational performances achieved 'in service' up to the end of 1999, with reference to the performance indicators for electrical energy production, nuclear safety, radiation protection, radioactive wastes and nuclear fuel are illustrated. For all of these items, comparisons are performed with similar indicators reported by other worldwide nuclear power plants, in order to assess our results. Finally, some comments about Cernavoda NPP Unit 2 project status and need to completion and commissioning it are included. (authors)

  16. Synthesis on construction unit cost development : technical report.

    Science.gov (United States)

    2009-01-01

    Availability of historical unit cost data is an important factor in developing accurate project cost estimates. : State highway agencies (SHAs) collect data on historical bids and/or production rates, crew sizes and mixes, : material costs, and equip...

  17. Industrial Engineering Tool Use in Quality Improvement Projects

    Energy Technology Data Exchange (ETDEWEB)

    Rodin, Wayne [Pantex Plant (PTX), Amarillo, TX (United States); Beruvides, Mario [Texas Tech Univ., Lubbock, TX (United States)

    2017-10-30

    This paper presents the results of an examination of industrial engineering tool use in Six Sigma projects for a contractor providing specialty manufacturing and service activities for a United States federal government agency.

  18. The LEONARDO-DA-VINCI pilot project "e-learning-assistant" - Situation-based learning in nursing education.

    Science.gov (United States)

    Pfefferle, Petra Ina; Van den Stock, Etienne; Nauerth, Annette

    2010-07-01

    E-learning will play an important role in the training portfolio of students in higher and vocational education. Within the LEONARDO-DA-VINCI action programme transnational pilot projects were funded by the European Union, which aimed to improve the usage and quality of e-learning tools in education and professional training. The overall aim of the LEONARDO-DA-VINCI pilot project "e-learning-assistant" was to create new didactical and technical e-learning tools for Europe-wide use in nursing education. Based on a new situation-oriented learning approach, nursing teachers enrolled in the project were instructed to adapt, develop and implement e- and blended learning units. According to the training contents nursing modules were developed by teachers from partner institutions, implemented in the project centers and evaluated by students. The user-package "e-learning-assistant" as a product of the project includes two teacher training units, the authoring tool "synapse" to create situation-based e-learning units, a student's learning platform containing blended learning modules in nursing and an open sourced web-based communication centre. Copyright 2009 Elsevier Ltd. All rights reserved.

  19. Climate change influences on the annual onset of Lyme disease in the United States

    Science.gov (United States)

    Monaghan, A. J.; Moore, S. M.; Sampson, K. M.; Beard, C. B.; Eisen, R. J.

    2015-12-01

    Lyme disease is the most commonly reported vector-borne illness in the United States. Lyme disease occurrence is highly seasonal and the annual springtime onset of cases is modulated by meteorological conditions in preceding months. A meteorological-based empirical model for Lyme disease onset week in the United States is driven with downscaled simulations from five global climate models and four greenhouse gas emissions scenarios to project the impacts of 21st century climate change on the annual onset week of Lyme disease. Projections are made individually and collectively for the 12 eastern States where >90% of cases occur. The national average annual onset week of Lyme disease is projected to become 0.4-0.5 weeks earlier for 2025-2040 (pLyme disease spirochete Borrelia burgdorferi in the eastern United States, may alter the disease transmission cycle in unforeseen ways. The results suggest 21st century climate change will make environmental conditions suitable for earlier annual onset of Lyme disease cases in the United States with possible implications for the timing of public health interventions.

  20. Projecting the land cover change and its environmental impacts in the Cedar River Basin in the Midwestern United States

    Science.gov (United States)

    Wu, Yiping; Liu, Shuguang; Sohl, Terry L.; Young, Claudia

    2013-01-01

    The physical surface of the Earth is in constant change due to climate forcing and human activities. In the Midwestern United States, urban area, farmland, and dedicated energy crop (e.g., switchgrass) cultivation are predicted to expand in the coming decades, which will lead to changes in hydrological processes. This study is designed to (1) project the land use and land cover (LULC) by mid-century using the FORecasting SCEnarios of future land-use (FORE-SCE) model under the A1B greenhouse gas emission scenario (future condition) and (2) assess its potential impacts on the water cycle and water quality against the 2001 baseline condition in the Cedar River Basin using the physically based soil and water assessment tool (SWAT). We compared the baseline LULC (National Land Cover data 2001) and 2050 projection, indicating substantial expansions of urban area and pastureland (including the cultivation of bioenergy crops) and a decrease in rangeland. We then used the above two LULC maps as the input data to drive the SWAT model, keeping other input data (e.g., climate) unchanged to isolate the LULC change impacts. The modeling results indicate that quick-response surface runoff would increase significantly (about 10.5%) due to the projected urban expansion (i.e., increase in impervious areas), and the baseflow would decrease substantially (about 7.3%) because of the reduced infiltration. Although the net effect may cause an increase in water yield, the increased variability may impede its use for public supply. Additionally, the cultivation of bioenergy crops such as switchgrass in the newly added pasture lands may further reduce the soil water content and lead to an increase in nitrogen loading (about 2.5% increase) due to intensified fertilizer application. These study results will be informative to decision makers for sustainable water resource management when facing LULC change and an increasing demand for biofuel production in this area.

  1. Projecting the land cover change and its environmental impacts in the Cedar River Basin in the Midwestern United States

    International Nuclear Information System (INIS)

    Wu Yiping; Liu Shuguang; Sohl, Terry L; Young, Claudia J

    2013-01-01

    The physical surface of the Earth is in constant change due to climate forcing and human activities. In the Midwestern United States, urban area, farmland, and dedicated energy crop (e.g., switchgrass) cultivation are predicted to expand in the coming decades, which will lead to changes in hydrological processes. This study is designed to (1) project the land use and land cover (LULC) by mid-century using the FORecasting SCEnarios of future land-use (FORE-SCE) model under the A1B greenhouse gas emission scenario (future condition) and (2) assess its potential impacts on the water cycle and water quality against the 2001 baseline condition in the Cedar River Basin using the physically based soil and water assessment tool (SWAT). We compared the baseline LULC (National Land Cover data 2001) and 2050 projection, indicating substantial expansions of urban area and pastureland (including the cultivation of bioenergy crops) and a decrease in rangeland. We then used the above two LULC maps as the input data to drive the SWAT model, keeping other input data (e.g., climate) unchanged to isolate the LULC change impacts. The modeling results indicate that quick-response surface runoff would increase significantly (about 10.5%) due to the projected urban expansion (i.e., increase in impervious areas), and the baseflow would decrease substantially (about 7.3%) because of the reduced infiltration. Although the net effect may cause an increase in water yield, the increased variability may impede its use for public supply. Additionally, the cultivation of bioenergy crops such as switchgrass in the newly added pasture lands may further reduce the soil water content and lead to an increase in nitrogen loading (about 2.5% increase) due to intensified fertilizer application. These study results will be informative to decision makers for sustainable water resource management when facing LULC change and an increasing demand for biofuel production in this area. (letter)

  2. WindFloat Pacific Project, Final Scientific and Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Banister, Kevin [Principle Power, Inc., Emeryville, CA (United States)

    2017-01-17

    PPI’s WindFloat Pacific project (WFP) was an up to 30 MW floating offshore wind demonstration project proposed off the Coast of Oregon. The project was to be sited approximately 18 miles due west of Coos Bay, in over 1000 ft. of water, and is the first floating offshore wind array proposed in the United States, and the first offshore wind project of any kind proposed off the West Coast. PPI’s WindFloat, a semi-submersible foundation designed for high-capacity (6MW+) offshore wind turbines, is at the heart of the proposed project, and enables access to the world class wind resource at the project site and, equally, to other deep water, high wind resource areas around the country.

  3. Printmaking Potpourri: Three Projects for the Price of One!

    Science.gov (United States)

    Lubiner, Glenda

    2011-01-01

    In this article, the author presents a few of the many printmaking projects she has done over the years: (1) Op-Art prints; (2) Georgia O'Keeffe monoprints; and (3) CD etchings. When teaching printmaking, the author always ties the project into an art-history lesson or a unit the grade level is studying in their other subjects. One printmaking…

  4. Collaborative online projects for English language learners in science

    Science.gov (United States)

    Terrazas-Arellanes, Fatima E.; Knox, Carolyn; Rivas, Carmen

    2013-12-01

    This paper summarizes how collaborative online projects (COPs) are used to facilitate science content-area learning for English Learners of Hispanic origin. This is a Mexico-USA partnership project funded by the National Science Foundation. A COP is a 10-week thematic science unit, completely online, and bilingual (Spanish and English) designed to provide collaborative learning experiences with culturally and linguistically relevant science instruction in an interactive and multimodal learning environment. Units are integrated with explicit instructional lessons that include: (a) hands-on and laboratory activities, (b) interactive materials and interactive games with immediate feedback, (c) animated video tutorials, (d) discussion forums where students exchange scientific learning across classrooms in the USA and in Mexico, and (e) summative and formative assessments. Thematic units have been aligned to U.S. National Science Education Standards and are under current revisions for alignment to the Common Core State Standards. Training materials for the teachers have been integrated into the project website to facilitate self-paced and independent learning. Preliminary findings of our pre-experimental study with a sample of 53 students (81 % ELs), distributed across three different groups, resulted in a 21 % statistically significant points increase from pretest to posttest assessments of science content learning, t( 52) = 11.07, p = .000.

  5. A Continuous Quality Improvement Project to Implement Infant-Driven Feeding as a Standard of Practice in the Newborn/Infant Intensive Care Unit.

    Science.gov (United States)

    Chrupcala, Kimberly A; Edwards, Taryn M; Spatz, Diane L

    2015-01-01

    To increase the number of neonates who were fed according to cues prior to discharge and potentially decrease length of stay. Continuous quality improvement. Eighty-five bed level IV neonatal intensive care unit. Surgical and nonsurgical neonates of all gestational ages. Neonates younger than 32 weeks gestation, who required intubation, continuous positive airway pressure (CPAP), high flow nasal cannula (HFNC), or did not have suck or gag reflexes were excluded as potential candidates for infant-driven feeding. The project was conducted over a 13-month period using the following methods: (a) baseline data collection, (b) designation of Infant Driven Feeding (IDF) Champions, (c) creation of a multidisciplinary team, (d) creation of electronic health record documentation, (e) initial staff education, (f) monthly team meetings, (g) reeducation throughout the duration of the project, and (h) patient-family education. Baseline data were collected on 20 neonates with a mean gestational age of 36 0/7(th) weeks and a mean total length of stay (LOS) of 43 days. Postimplementation data were collected on 150 neonates with a mean gestational age of 36 1/7(th) weeks and a mean total LOS of 36.4 days. A potential decrease in the mean total LOS of stay by 6.63 days was achieved during this continuous quality improvement (CQI) project. Neonates who are fed according to cues can become successful oral feeders and can be safely discharged home regardless of gestational age or diagnosis. © 2015 AWHONN, the Association of Women's Health, Obstetric and Neonatal Nurses.

  6. Watergate: A Teaching Unit. Curriculum Project Report No. 4040. Experimental Edition.

    Science.gov (United States)

    Malament, Elizabeth E.

    Because Watergate tested the strength of the U.S. constitutional system and proved that it worked, this unit could serve as a focal point for study of the U.S. Constitution. The three objectives of the document are: (1) to expand knowledge of the governance process through study of the separation of powers, the impeachment process, the right to…

  7. Seismic evaluation of buildings in the Eastern and Central United States

    International Nuclear Information System (INIS)

    Malley, J.O.; Poland, C.D.

    1991-01-01

    The vast majority of the existing buildings in the Central and Eastern United States have not been designed to resist seismic forces, even though it is becoming widely accepted that there is a potential for damaging earthquakes in these regions for the country. These buildings, therefore, may constitute a serious threat to life safety in the event of a major earthquake. The ATC-14 procedure for the seismic evaluation of existing buildings has begun to gain wide acceptance since its publication in 1987. The National Center for Earthquake Engineering Research (NCEER) funded a project to critically assess the applicability of ATC-14 to buildings in the Eastern and Central United States. This NCEER project developed a large volume of recommended modifications to ATC-14 which are intended to improve the modifications to ATC-14 procedure's recommendations for the seismic evaluation of buildings in regions of low siesmicity. NCEER is sponsoring a second project which will produce a separate document for the seismic evaluation of existing buildings which specifically focuses on structures in these areas of the country. This report, which should be completed in 1991, will provide a valuable tool for practicing engineers performing these evaluations in the Eastern and Central United States. This paper will present the results of these NCEER projects and introduce the revised ATC-14 methodology

  8. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    Energy Technology Data Exchange (ETDEWEB)

    Taddeucci, Joe [Dept. of Public Works, Boulder, CO (United States). Utilities Division

    2013-03-29

    The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a

  9. Upgrade of KNPEC no.2 Simulator for Kori Unit 3 Power Uprating

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Jin-Hyuk; Lee, Seung-Ho [KEPRI, Daejeon (Korea, Republic of)

    2007-07-01

    Kori-Unit 3 and 4 is preparing the operation of the power-uprating (2900MWt), and therefore the Korea regulatory body(KINS) requested the operator training with the simulator reflecting the power-uprating. As a result of the intensive research and expertise of KEPRI on the simulators, KEPRI accomplished the upgrade project of KNPEC no.2 simulator for Kori-Unit 3 power-uprating. This project includes various high-tech methods incorporating - realtime neutronics model based on MASTER (Multi-purpose Analyzer for Static and Transient Effects of Reactors) code, best-estimate neutronics code by the KINS, (By using the RMASTER, the precision of the simulation of the neutron behaviors in the core is highly improved.) - betterment of the reactor coolant system and the balance-of-plant system - modification of the corresponding setpoints due to the power-uprating And the acceptance test procedure (ATP) was successfully carried out through the integration of system models and its performance tests. Through the success of this project, the operator training for the power uprating of the Kori-Unit 3 will be accomplished before its power operation and, after all, this simulator will contribute to the safe operation for the power-uprating of the Kori-Unit 3 and 4.

  10. methanization of organic matters. Guide for project developers

    International Nuclear Information System (INIS)

    2015-02-01

    This document aims at informing potential project developers (farmers, local communities, industrials) all along the creation of a methanization unit. It precisely indicates administrative procedures required to complete a project. It first presents some generalities about methanization (matters and their performance, methanization cycle, biogas), describes methanization processes (dry and humid), and valorisation processes (co-generation, hot water production, gas injection into the public network), presents digestate characteristics, and discusses benefits and drawbacks of methanization. The different steps of a project management are then analysed. Additional procedures are indicated, and risks and traps of methanization projects are highlighted. The document comes along with a large number of appendices which can be documents released by professional or public bodies

  11. Unit-of-Use Versus Traditional Bulk Packaging

    Directory of Open Access Journals (Sweden)

    Tiffany So

    2012-01-01

    Full Text Available Background: The choice between unit-of-use versus traditional bulk packaging in the US has long been a continuous debate for drug manufacturers and pharmacies in order to have the most efficient and safest practices. Understanding the benefits of using unit-of-use packaging over bulk packaging by US drug manufacturers in terms of workflow efficiency, economical costs and medication safety in the pharmacy is sometimes challenging. Methods: A time-saving study comparing the time saved using unit-of-use packaging versus bulk packaging, was examined. Prices between unit-of-use versus bulk packages were compared by using the Red Book: Pharmacy's Fundamental Reference. Other articles were reviewed on the topics of counterfeiting, safe labeling, and implementation of unit-of-use packaging. Lastly, a cost-saving study was reviewed showing how medication adherence, due to improved packaging, could be cost-effective for patients. Results: When examining time, costs, medication adherence, and counterfeiting arguments, unit-of-use packaging proved to be beneficial for patients in all these terms.   Type: Student Project

  12. Pre-service proof pressure and leak rate tests for the Qinshan CANDU project reactor buildings

    International Nuclear Information System (INIS)

    Petrunik, K.J.; Khan, A.; Ricciuti, R.; Ivanov, A.; Chen, S.

    2003-01-01

    The Qinshan CANDU Project Reactor Buildings (Units 1 and 2) have been successfully tested for the Pre-Service Proof Pressure and Integrated Leak Rate Tests. The Unit 1 tests took place from May 3 to May 9, 2002 and from May 22 to May 25, 2002, and the Unit 2 tests took place from January 21 to January 27, 2003. This paper discusses the significant steps taken at minimum cost on the Qinshan CANDU Project, which has resulted in a) very good leak rate (0.21%) for Unit 1 and excellent leak rate (0.130%) for Unit 2; b) continuous monitoring of the structural behaviour during the Proof Pressure Test, thus eliminating any repeat of the structural test due to lack of data; and c) significant schedule reduction achieved for these tests in Unit 2. (author)

  13. Status and understanding of groundwater quality in the Tahoe-Martis, Central Sierra, and Southern Sierra study units, 2006-2007--California GAMA Priority Basin Project

    Science.gov (United States)

    Fram, Miranda S.; Belitz, Kenneth

    2012-01-01

    Groundwater quality in the Tahoe-Martis, Central Sierra, and Southern Sierra study units was investigated as part of the Priority Basin Project of the California Groundwater Ambient Monitoring and Assessment (GAMA) Program. The three study units are located in the Sierra Nevada region of California in parts of Nevada, Placer, El Dorado, Madera, Tulare, and Kern Counties. The GAMA Priority Basin Project is being conducted by the California State Water Resources Control Board, in collaboration with the U.S. Geological Survey (USGS) and the Lawrence Livermore National Laboratory. The project was designed to provide statistically robust assessments of untreated groundwater quality within the primary aquifer systems used for drinking water. The primary aquifer systems (hereinafter, primary aquifers) for each study unit are defined by the depth of the screened or open intervals of the wells listed in the California Department of Public Health (CDPH) database of wells used for municipal and community drinking-water supply. The quality of groundwater in shallower or deeper water-bearing zones may differ from that in the primary aquifers; shallower groundwater may be more vulnerable to contamination from the surface. The assessments for the Tahoe-Martis, Central Sierra, and Southern Sierra study units were based on water-quality and ancillary data collected by the USGS from 132 wells in the three study units during 2006 and 2007 and water-quality data reported in the CDPH database. Two types of assessments were made: (1) status, assessment of the current quality of the groundwater resource, and (2) understanding, identification of the natural and human factors affecting groundwater quality. The assessments characterize untreated groundwater quality, not the quality of treated drinking water delivered to consumers by water purveyors. Relative-concentrations (sample concentrations divided by benchmark concentrations) were used for evaluating groundwater quality for those

  14. CDIO Projects in DTU’s Chemical and Biochemical B.Eng. Study Program

    DEFF Research Database (Denmark)

    Clement, Karsten; Harris, Pernille; Agersø, Yvonne

    2011-01-01

    The aim of this paper is to describe how the CDIO standards [1] have influenced the cross-disciplinary projects that are part of the study plan for the Chemical and Biochemical B.Eng. program. Four projects are described: The 1st semester design-build project on cleaning of waste water from a power...... plant, the 2nd semester laboratory project concerning antimicrobial resistant E. coli bacteria in retail meats, the 3rd semester project on unit operations in enzyme production, the 4th semester project on the fermentation and purification part of enzyme production....

  15. Project-Based Management Development: "The Volvo Story."

    Science.gov (United States)

    Branch, John; Smith, Bryan

    1992-01-01

    A modular group project-based approach to management development was implemented by Volvo Concessionaires (United Kingdom) in partnership with training consultants. Ingredients of its success included top-level commitment, investment in diagnosis and tailoring, and use of company-specific case studies. (SK)

  16. OECD/NEA Aagesta decontamination project. Phase 1, final report

    International Nuclear Information System (INIS)

    1982-12-01

    The objective of the project is to utilize the four primary loops of the Aagesta reactor to demonstrate decontamination methods for PWR primary systems. The first phase of the project consisted of laboratory scale tests. The methods tested were developed at a) Studsvik Energiteknik AB, Sweden (a soft chemistry). b) Kraftwerk Union AG, Federal Republic of Germany, (two chemistries, one soft and one hard). c) Swiss Federal Institute of Reactor Research (two chemistries, one soft and one hard). d) Berkeley Nuclear Laboratories, United Kingdom, (a soft chemistry). The test programme consisted of decontamination tests on steam generator tubing and other active material from Aagesta and a number of operating reactors as well as material compatibility tests on standardized samples of a representative selection of modern PWR primary system materials. Six countries have participated in Phase I of the project - the four countries named above as well as the United States of America and Italy. Studsvik Energiteknik AB was appointed Project leader. The results show that all six processes in general met the acceptance criteria both regarding decontamination and corrosion. The decontamination results with the hard chemistries were rather uneven. (Author)

  17. Hydrogen Fuel Cell Performance as Telecommunications Backup Power in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, Jennifer [National Renewable Energy Lab. (NREL), Golden, CO (United States); Saur, Genevieve [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sprik, Sam [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-03-01

    Working in collaboration with the U.S. Department of Energy (DOE) and industry project partners, the National Renewable Energy Laboratory (NREL) acts as the central data repository for the data collected from real-world operation of fuel cell backup power systems. With American Recovery and Reinvestment Act of 2009 (ARRA) co-funding awarded through DOE's Fuel Cell Technologies Office, more than 1,300 fuel cell units were deployed over a three-plus-year period in stationary, material handling equipment, auxiliary power, and backup power applications. This surpassed a Fuel Cell Technologies Office ARRA objective to spur commercialization of an early market technology by installing 1,000 fuel cell units across several different applications, including backup power. By December 2013, 852 backup power units out of 1,330 fuel cell units deployed were providing backup service, mainly for telecommunications towers. For 136 of the fuel cell backup units, project participants provided detailed operational data to the National Fuel Cell Technology Evaluation Center for analysis by NREL's technology validation team. NREL analyzed operational data collected from these government co-funded demonstration projects to characterize key fuel cell backup power performance metrics, including reliability and operation trends, and to highlight the business case for using fuel cells in these early market applications. NREL's analyses include these critical metrics, along with deployment, U.S. grid outage statistics, and infrastructure operation.

  18. Summary report on the 1985 United Kingdom radioactive waste inventory

    International Nuclear Information System (INIS)

    Fletcher, A.M.; Wear, F.J.; Haselden, H.; Shepherd, J.; Tymons, B.J.

    1986-04-01

    Stocks of radioactive waste in the United Kingdom which have arisen, or are projected to arise, from commercial nuclear power reactors and fuel cycle facilities, research, medical and industrial uses of radioactive nuclides are given in the form of summary tables. Projected future arisings from operation and decommissioning of facilities and notional nuclear power generation programmes to 2030 are also given. (author)

  19. Integrating public information activities on a technical project

    International Nuclear Information System (INIS)

    Little, Sh. K.; Vecchiola, S.F.

    1984-01-01

    Through gradual evolution and successful performance, the WIPP Communications group has gained respect and recognition as a dual service organization that offers numerous benefits to a technical project. Westinghouse assembled a team that has successfully coordinated and encouraged an exchange of information not only with the public information realm but also as a project service and function. WIPP has combined educational services, external and employee communication and public information into one unit called ''Communications''

  20. Final Report - Navajo Electrification Demonstration Project - FY2004

    Energy Technology Data Exchange (ETDEWEB)

    Kenneth L. Craig, Interim General Manager

    2007-03-31

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year projects which addresses the needs of unserved Navajo Nation residents without basic electricity services. The Navajo Nation is the United States' largest tribe, in terms of population and land. An estimated 18,000 Navajo Nation homes do not have basic grid-tied electricity--and this third year of funding, known as NEDP-3, provided 351 power line extensions to Navajo families.

  1. Improving food and agricultural production. Thailand. Project findings and recommendations

    International Nuclear Information System (INIS)

    1992-01-01

    This document is the terminal report of a United Nations Development Program project to improve food and agricultural production in Thailand by means of nuclear and related technology. The project resulted in improved mutant material to be made available to plant breeders as well as in reports and recommendations on soil-water-plant management practices and livestock management. An additional benefit has been the specialized training that has been provided to many researchers in the country through the project

  2. Beowawe Bottoming Binary Unit - Final Technical Report for EE0002856

    Energy Technology Data Exchange (ETDEWEB)

    McDonald, Dale Edward

    2013-02-12

    This binary plant is the first high-output refrigeration based waste heat recovery cycle in the industry. Its working fluid is environmentally friendly and as such, the permits that would be required with a butane based cycle are not necessary. The unit is modularized, meaning that the unit’s individual skids were assembled in another location and were shipped via truck to the plant site. This project proves the technical feasibility of using low temperature brine The development of the unit led to the realization of low temperature, high output, and environmentally friendly heat recovery systems through domestic research and engineering. The project generates additional renewable energy for Nevada, resulting in cleaner air and reduced carbon dioxide emissions. Royalty and tax payments to governmental agencies will increase, resulting in reduced financial pressure on local entities. The major components of the unit were sourced from American companies, resulting in increased economic activity throughout the country.

  3. In-core monitor housing replacement at Fukushima Daiichi Unit No.4

    International Nuclear Information System (INIS)

    Arai, Tomoyuki

    1999-01-01

    The in-core monitor (ICM) housing replacement of a Boiling Water Reactor (BWR) has been completed at Fukushima-Daiichi Unit No. 4 (1F4) of the Tokyo Electric Power Company (TEPCO) in Japan. Since cracking of the inside surface of an ICM housing was found in this unit, the ICM housing was replaced with one made of low-carbon stainless steel (SS) to improve Intergranular Stress Corrosion Cracking (IGSCC) resistance. This project is the first application of the replacement procedure for the ICM housing and employs various advanced technologies. The outline of the ICM housing replacement project and applied technologies are discussed in this paper. (author)

  4. An Evaluation of Project Learning Tree in British Columbia. Appendices.

    Science.gov (United States)

    Conry, Robert F.; And Others

    The volume contains seven appendices (A-G) which accompany the first volume. Appendix A provides a list of project personnel and of teachers who participated in the unit development workshop. Appendix B, composed of six sections, includes the unit lesson plans and teachers' guides used in the field study for grades 3, 5, and 7. The grade materials…

  5. SERI Solar Radiation Resource Assessment Project: Fiscal Year 1990 Annual Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Riordan, C; Maxwell, E; Stoffel, T; Rymes, M; Wilcox, S

    1991-07-01

    The purpose of the Solar Radiation Resource Project is to help meet the needs of the public, government, industry, and utilities for solar radiation data, models, and assessments as required to develop, design, deploy, and operate solar energy conversion systems. The project scientists produce information on the spatial (geographic), temporal (hourly, daily, and seasonal), and spectral (wavelength distribution) variability of solar radiation at different locations in the United States. Resources committed to the project in FY 1990 supported about four staff members, including part-time administrative support. With these resources, the staff must concentrate on solar radiation resource assessment in the United States; funds do not allow for significant efforts to respond to a common need for improved worldwide data. 34 refs., 21 figs., 6 tabs.

  6. The United Nations University and Information Development.

    Science.gov (United States)

    Tanaskovic, Ines Wesley

    1994-01-01

    Describes the role of the United Nations University (UNU) in promoting the effective use of new information technologies in support of science and technology for development. The UNU Information and Decision Systems (INDES) project examines the constraints preventing developing nations from using advances in informatics and from integrating their…

  7. Projected freshwater withdrawals in the United States under a changing climate

    Science.gov (United States)

    Thomas C. Brown; Romano Foti; Jorge A. Ramirez

    2013-01-01

    Relying on the U.S. Geological Survey water use data for the period 1960 2005, this paper summarizes past water use and then projects future water use based on the trends in water use efficiency and major drivers of water use. Water use efficiency has improved in most sectors. Over the past 45 years, withdrawals in industry and at thermoelectric plants have steadily...

  8. Nurse Project Consultant: Critical Care Nurses Move Beyond the Bedside to Affect Quality and Safety.

    Science.gov (United States)

    Mackinson, Lynn G; Corey, Juliann; Kelly, Veronica; O'Reilly, Kristin P; Stevens, Jennifer P; Desanto-Madeya, Susan; Williams, Donna; O'Donoghue, Sharon C; Foley, Jane

    2018-06-01

    A nurse project consultant role empowered 3 critical care nurses to expand their scope of practice beyond the bedside and engage within complex health care delivery systems to reduce harms in the intensive care unit. As members of an interdisciplinary team, the nurse project consultants contributed their clinical expertise and systems knowledge to develop innovations that optimize care provided in the intensive care unit. This article discusses the formal development of and institutional support for the nurse project consultant role. The nurse project consultants' responsibilities within a group of quality improvement initiatives are described and their challenges and lessons learned discussed. The nurse project consultant role is a new model of engaging critical care nurses as leaders in health care redesign. ©2018 American Association of Critical-Care Nurses.

  9. Cernavoda NPP Unit 1 - a plant of several generations

    International Nuclear Information System (INIS)

    Rotaru, I.; Metes, M.; Anghelescu, M.S.

    2000-01-01

    Cernavoda NPP Unit 1, the first nuclear power unit in Romania, has a long and tormented history. It represents a rather unique case in Eastern Europe. The project started well before 1989 (the construction phase lasted 17 years and generations were involved in its completion), but it is effectively based on western technology (Candu). Meanwhile, the national nuclear program underwent many changes, affecting the lives and careers of Romanian nuclear professionals. Finally, on December 2 nd 1996, the unit began its c ommercial operation , being operated at its nominal power rating of 706 MW e . It now provides a reliable source of electricity for Romanian economy, supplying to the national grid about 10% of the country's average annual demand. The paper reflects some aspects related to the shift of generations during the project's development, including the present stage. The operational performances achieved 'in service' by Cernavoda NPP Unit 1 up to the end of 1999 , are also presented. Reference to the electrical energy production, performance indicators, production costs, nuclear safety, radiation protection, radioactive wastes, nuclear fuel consumption and nuclear fuel performances are included. Comparisons are performed with similar indicators reported by other worldwide nuclear power plants, in order to assess our results. (authors)

  10. Designing and Conducting Health Systems Research Projects ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Home · Resources · Publications. Designing and Conducting Health Systems Research Projects Volume 1: Proposal Development and Fieldwork ... IDRC and the United Kingdom's Global AMR Innovation Fund—managed by the ... New website will help record vital life events to improve access to services for all.

  11. Tomography system having an ultrahigh-speed processing unit

    International Nuclear Information System (INIS)

    Brunnett, C.J.; Gerth, V.W. Jr.

    1977-01-01

    A transverse section tomography system has an ultrahigh-speed data processing unit for performing back projection and updating. An x-ray scanner directs x-ray beams through a planar section of a subject from a sequence of orientations and positions. The data processing unit includes a scan storage section for retrievably storing a set of filtered scan signals in scan storage locations corresponding to predetermined beam orientations. An array storage section is provided for storing image signals as they are generated

  12. UDIN's dismantling projects

    International Nuclear Information System (INIS)

    Laffaille, C.

    1993-01-01

    The role of UDIN (Central unit for nuclear facility decommissioning) at the CEA is reviewed together with the main specific aspects of nuclear dismantling: the different options and dismantling strategies and costs. The characteristics of the main on-going projects are described: graphite-gas reactors (G2/G3), RAPSODIE (RNR), AT1 (pilot RNR fuel reprocessing plant), ELAN II B (Cesium source conditioning plant), EL4 (heavy water/CO2 reactor), RM2 (fuel control radio-metallurgical laboratory) and UB-UM (Uranium enrichment plant)

  13. Supply and Demand for Radiation Oncology in the United States: Updated Projections for 2015 to 2025

    International Nuclear Information System (INIS)

    Pan, Hubert Y.; Haffty, Bruce G.; Falit, Benjamin P.; Buchholz, Thomas A.; Wilson, Lynn D.; Hahn, Stephen M.; Smith, Benjamin D.

    2016-01-01

    Purpose: Prior studies have forecasted demand for radiation therapy to grow 10 times faster than the supply between 2010 and 2020. We updated these projections for 2015 to 2025 to determine whether this imbalance persists and to assess the accuracy of prior projections. Methods and Materials: The demand for radiation therapy between 2015 and 2025 was estimated by combining current radiation utilization rates determined by the Surveillance, Epidemiology, and End Results data with population projections provided by the US Census Bureau. The supply of radiation oncologists was forecast by using workforce demographics and full-time equivalent (FTE) status provided by the American Society for Radiation Oncology (ASTRO), current resident class sizes, and expected survival per life tables from the US Centers for Disease Control. Results: Between 2015 and 2025, the annual total number of patients receiving radiation therapy during their initial treatment course is expected to increase by 19%, from 490,000 to 580,000. Assuming a graduating resident class size of 200, the number of FTE physicians is expected to increase by 27%, from 3903 to 4965. In comparison with prior projections, the new projected demand for radiation therapy in 2020 dropped by 24,000 cases (a 4% relative decline). This decrease is attributable to an overall reduction in the use of radiation to treat cancer, from 28% of all newly diagnosed cancers in the prior projections down to 26% for the new projections. By contrast, the new projected supply of radiation oncologists in 2020 increased by 275 FTEs in comparison with the prior projection for 2020 (a 7% relative increase), attributable to rising residency class sizes. Conclusion: The supply of radiation oncologists is expected to grow more quickly than the demand for radiation therapy from 2015 to 2025. Further research is needed to determine whether this is an appropriate correction or will result in excess capacity.

  14. Supply and Demand for Radiation Oncology in the United States: Updated Projections for 2015 to 2025

    Energy Technology Data Exchange (ETDEWEB)

    Pan, Hubert Y. [Department of Radiation Oncology, The University of Texas MD Anderson Cancer Center, Houston, Texas (United States); Haffty, Bruce G. [Department of Radiation Oncology, Robert Wood Johnson Medical School – University of Medicine and Dentistry of New Jersey, New Brunswick, New Jersey (United States); Falit, Benjamin P. [Radiation Oncology Associates, Lowell, Massachusetts (United States); Buchholz, Thomas A. [Department of Radiation Oncology, The University of Texas MD Anderson Cancer Center, Houston, Texas (United States); Wilson, Lynn D. [Department of Therapeutic Radiology, Yale University School of Medicine, New Haven, Connecticut (United States); Hahn, Stephen M. [Department of Radiation Oncology, The University of Texas MD Anderson Cancer Center, Houston, Texas (United States); Smith, Benjamin D., E-mail: bsmith3@mdanderson.org [Department of Radiation Oncology, The University of Texas MD Anderson Cancer Center, Houston, Texas (United States)

    2016-11-01

    Purpose: Prior studies have forecasted demand for radiation therapy to grow 10 times faster than the supply between 2010 and 2020. We updated these projections for 2015 to 2025 to determine whether this imbalance persists and to assess the accuracy of prior projections. Methods and Materials: The demand for radiation therapy between 2015 and 2025 was estimated by combining current radiation utilization rates determined by the Surveillance, Epidemiology, and End Results data with population projections provided by the US Census Bureau. The supply of radiation oncologists was forecast by using workforce demographics and full-time equivalent (FTE) status provided by the American Society for Radiation Oncology (ASTRO), current resident class sizes, and expected survival per life tables from the US Centers for Disease Control. Results: Between 2015 and 2025, the annual total number of patients receiving radiation therapy during their initial treatment course is expected to increase by 19%, from 490,000 to 580,000. Assuming a graduating resident class size of 200, the number of FTE physicians is expected to increase by 27%, from 3903 to 4965. In comparison with prior projections, the new projected demand for radiation therapy in 2020 dropped by 24,000 cases (a 4% relative decline). This decrease is attributable to an overall reduction in the use of radiation to treat cancer, from 28% of all newly diagnosed cancers in the prior projections down to 26% for the new projections. By contrast, the new projected supply of radiation oncologists in 2020 increased by 275 FTEs in comparison with the prior projection for 2020 (a 7% relative increase), attributable to rising residency class sizes. Conclusion: The supply of radiation oncologists is expected to grow more quickly than the demand for radiation therapy from 2015 to 2025. Further research is needed to determine whether this is an appropriate correction or will result in excess capacity.

  15. Ontario: linking nursing outcomes, workload and staffing decisions in the workplace: the Dashboard Project.

    Science.gov (United States)

    Fram, Nancy; Morgan, Beverley

    2012-03-01

    Research shows that nurses want to provide more input into assessing patient acuity, changes in patient needs and staffing requirements. The Dashboard Project involved the further development and application of an electronic monitoring tool that offers a single source of nursing, patient and organizational information. It is designed to help inform nurse staffing decisions within a hospital setting. The Dashboard access link was installed in computers in eight nursing units within the Hamilton Health Sciences (HHS) network. The Dashboard indicators are populated from existing information/patient databases within the Decision Support Department at HHS. Committees composed of the unit manager, staff nurses, project coordinator, financial controller and an information controller met regularly to review the Dashboard indicators. Participants discussed the ability of the indicators to reflect their patients' needs and the feasibility of using the indicators to inform their clinical staffing plans. Project findings suggest that the Dashboard is a work in progress. Many of the indicators that had originally been incorporated were refined and will continue to be revised based on suggestions from project participants and further testing across HHS. Participants suggested the need for additional data, such as the time that nurses are off the unit (for code blue response, patient transfers and accompanying patients for tests); internal transfers/bed moves to accommodate patient-specific issues and particularly to address infection control issues; deaths and specific unit-centred data in addition to the generic indicators. The collaborative nature of the project enabled staff nurses and management to work together on a matter of high importance to both, providing valuable recommendations for shared nursing and interprofessional planning, further Dashboard development and project management.

  16. Description of Project Sapphire. Revision 1

    International Nuclear Information System (INIS)

    Taylor, R.G.

    1995-01-01

    The mission of Project Sapphire was to repackage approximately 600 kg of highly enriched uranium (HEU) in the Republic of Kazakhstan into internationally acceptable shipping packages and transport the material to a storage location in the United States. There were four material types to be repackaged: metal; oxide; uranium/beryllium (U/Be) alloy; and residues from U/Be alloy production. Seven major steps described in this report were necessary for successful execution of the project: planning and training; readiness assessment; deployment; set up; process; take down; and transport. Nuclear criticality safety especially affected several of these steps

  17. Implementation of inter-unit analysis for C and C++ languages in a source-based static code analyzer

    Directory of Open Access Journals (Sweden)

    A. V. Sidorin

    2015-01-01

    Full Text Available The proliferation of automated testing capabilities arises a need for thorough testing of large software systems, including system inter-component interfaces. The objective of this research is to build a method for inter-procedural inter-unit analysis, which allows us to analyse large and complex software systems including multi-architecture projects (like Android OS as well as to support complex assembly systems of projects. Since the selected Clang Static Analyzer uses source code directly as input data, we need to develop a special technique to enable inter-unit analysis for such analyzer. This problem is of special nature because of C and C++ language features that assume and encourage the separate compilation of project files. We describe the build and analysis system that was implemented around Clang Static Analyzer to enable inter-unit analysis and consider problems related to support of complex projects. We also consider the task of merging abstract source trees of translation units and its related problems such as handling conflicting definitions, complex build systems and complex projects support, including support for multi-architecture projects, with examples. We consider both issues related to language design and human-related mistakes (that may be intentional. We describe some heuristics that were used for this work to make the merging process faster. The developed system was tested using Android OS as the input to show it is applicable even for such complicated projects. This system does not depend on the inter-procedural analysis method and allows the arbitrary change of its algorithm.

  18. PERFORMANCE OF THE EXTENSION PROJECT “WE GO TO SUCKLE, MOTHER”, IN THE YEAR OF 2006

    Directory of Open Access Journals (Sweden)

    Fabrícia Calheira Primo Paiva

    2007-08-01

    Full Text Available The Extension Project “Let’s go to breastfeed, mother?” it comes acting since 1993 with the objective to stimulate the breastfeeding in the jequieense community and surrounding cities, aims the reduction of the infantile mortality and morbidity. In this study, we search to tell the activities that had been developed by the related project in 2006. This is a documental research of quantitative nature. It had as scene the Basic Health Care Units and the rooming-in unit of a public hospital. The sampling consisted of 500 pregnant women and 1.195 woman in postpartum registered in cadastre in these units. The results shows the accomplishment of 98 informative lectures in the Basic Health Care Units; 290 in the rooming-in unit; 124 household visits; distributed 1.195 educative folders; orientation of three scientific research approaching the thematic; participation in the Breastfeeding World-wide Week; accomplishment of 24 meeting of the group of study; cadastre of woman in postpartum in the rooming-in unit; accomplishment of 3 workshops; participation in 1 meeting of the Integrated Group of Incentive to Breastfeeding in Salvador city. We understand that the cited project comes giving your contribution to the spreading, incentive and promotion to the breastfeeding, constituting a project of social relevance because awaking in the academic community and extra-academic the necessity and the importance of the practical of the breastfeeding.

  19. Performance of the extension project “we go to suckle, mother”, in the year of 2006

    Directory of Open Access Journals (Sweden)

    Zulmerinda Meira Oliveira

    2007-01-01

    Full Text Available The Extension Project “Let’s go to breastfeed, mother?” it comes acting since 1993 with the objective to stimulate the breastfeeding in the jequieense community and surrounding cities, aims the reduction of the infantile mortality and morbidity. In this study, we search to tell the activities that had been developed by the related project in 2006. This is a documental research of quantitative nature. It had as scene the Basic Health Care Units and the rooming-in unit of a public hospital. The sampling consisted of 500 pregnant women and 1.195 woman in postpartum registered in cadastre in these units. The results shows the accomplishment of 98 informative lectures in the Basic Health Care Units; 290 in the rooming-in unit; 124 household visits; distributed 1.195 educative folders; orientation of three scientific research approaching the thematic; participation in the Breastfeeding World-wide Week; accomplishment of 24 meeting of the group of study; cadastre of woman in postpartum in the rooming-in unit; accomplishment of 3 workshops; participation in 1 meeting of the Integrated Group of Incentive to Breastfeeding in Salvador city. We understand that the cited project comes giving your contribution to the spreading, incentive and promotion to the breastfeeding, constituting a project of social relevance because awaking in the academic community and extra-academic the necessity and the importance of the practical of the breastfeeding.

  20. Energy efficiency of computer power supply units - Final report

    Energy Technology Data Exchange (ETDEWEB)

    Aebischer, B. [cepe - Centre for Energy Policy and Economics, Swiss Federal Institute of Technology Zuerich, Zuerich (Switzerland); Huser, H. [Encontrol GmbH, Niederrohrdorf (Switzerland)

    2002-11-15

    This final report for the Swiss Federal Office of Energy (SFOE) takes a look at the efficiency of computer power supply units, which decreases rapidly during average computer use. The background and the purpose of the project are examined. The power supplies for personal computers are discussed and the testing arrangement used is described. Efficiency, power-factor and operating points of the units are examined. Potentials for improvement and measures to be taken are discussed. Also, action to be taken by those involved in the design and operation of such power units is proposed. Finally, recommendations for further work are made.

  1. A change in strategy for a CERCLA Removal Action Demolition Project in progress results in overall project enhancements

    International Nuclear Information System (INIS)

    Albertin, M.; Nichols, R.M.; Edwards, D.T.

    1995-01-01

    This paper discusses changes made in a demolition project at the Fernald Environmental Management Project (FEMP), a site on the National Priorities list (NPL), owned by the Department of Energy. The project, to demolish fourteen uranium ore silos and their structure, was based on a Removal Action Work Plan, submitted and approved by the United States Environmental Protection Agency (USEPA), that integrated Comprehensive Environmental Response Compensation and Liability Act (CERCLA) requirements to remove the source of contamination and threat to public health and the environment. After the demolition contractor defaulted at 30% complete, completion of the project by the USEPA deadline was threatened. The recovery plan included re-evaluation of project documents in addition to the schedule. It was determined that re-interpretation of the removal action criteria, including design and Removal Action Work Plan, would eliminate road-blocks, and optimize resources, resulting in project completion by the original deadline even after lost-time in mobilizing another contractor. This presentation will discuss the open-quotes lessons learnedclose quotes by the project team and illustrate how simplification of construction methods resulted in enhancements to the environmental controls, improved material handing, and created a safer work environment

  2. United States cost of military force projection in the Persian Gulf, 1976-2007

    Energy Technology Data Exchange (ETDEWEB)

    Stern, Roger J. [Oil, Energy and the Middle East Program, Department of Near Eastern Studies and Princeton Environmental Institute, Guyot Hall, Princeton University, Princeton, NJ 08544 (United States)

    2010-06-15

    This paper presents the first estimate of United States military cost for Persian Gulf force (C{sub PGfp}) derived entirely by a quantitative method. An activity-based cost (ABC) model uses geographic distribution of aircraft carriers as a proxy allocator of Department of Defense (DoD) baseline cost to regional operations. Allocation follows simply from DoD data that since 1990 no less than one aircraft carrier has been continuously on-station in the Persian Gulf; that eight are required to keep one on-station there; that the Navy has had eleven-fifteen carriers since 1990; and that Army and Air Force units are virtually never deployed to combat operations without Navy units. For 1976-2007 C{sub PGfp} is estimated to be $6.8 x 10{sup 12} and for 2007 $0.5 x 10{sup 12} (2008$). This substantial military investment is not a remedy for the market failure at the heart of regional security problem, which is oil market power. When C{sub PGfp} is added to economic losses attributed to market power in another recent study, the severity of this market failure becomes more apparent. (author)

  3. United States cost of military force projection in the Persian Gulf, 1976-2007

    International Nuclear Information System (INIS)

    Stern, Roger J.

    2010-01-01

    This paper presents the first estimate of United States military cost for Persian Gulf force (C PGfp ) derived entirely by a quantitative method. An activity-based cost (ABC) model uses geographic distribution of aircraft carriers as a proxy allocator of Department of Defense (DoD) baseline cost to regional operations. Allocation follows simply from DoD data that since 1990 no less than one aircraft carrier has been continuously on-station in the Persian Gulf; that eight are required to keep one on-station there; that the Navy has had eleven-fifteen carriers since 1990; and that Army and Air Force units are virtually never deployed to combat operations without Navy units. For 1976-2007 C PGfp is estimated to be $6.8 x 10 12 and for 2007 $0.5 x 10 12 (2008$). This substantial military investment is not a remedy for the market failure at the heart of regional security problem, which is oil market power. When C PGfp is added to economic losses attributed to market power in another recent study, the severity of this market failure becomes more apparent. (author)

  4. LIFAC Demonstration at Richmond Power and Light Whitewater Valley Unit No. 2 Volume II: Project Performance and Economics

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    1998-04-01

    The C1ean Coal Technology (CCT) Program has been recognized in the National Energy Strategy as a major initiative whereby coal will be able to reach its full potential as a source of energy for the nation and the international marketplace. Attainment of this goal depends upon the development of highly efficient, environmentally sound, competitive coal utilization technologies responsive to diverse energy markets and varied consumer needs. The CCT Program is an effort jointly funded by government and industry whereby the most promising of the advanced coal-based technologies are being moved into the marketplace through demonstration. The CCT Program is being implemented through a total of five competitive solicitations. LIFAC North America, a joint venture partnership of ICF Kaiser Engineers, Inc., and Tampella Power Corporation, is currently demonstrating the LIFAC flue gas desulfurization technology developed by Tampella Power. This technology provides sulfur dioxide emission control for power plants, especially existing facilities with tight space limitations. Sulfur dioxide emissions are expected to be reduced by up to 85% by using limestone as a sorbent. The LIFAC technology is being demonstrated at Whitewater Valley Unit No. 2, a 60-MW coal-fired power plant owned and operated by Richmond Power and Light (RP&L) and located in Richmond, Indiana. The Whitewater plant consumes high-sulfur coals, with sulfur contents ranging from 2.0-2.9 $ZO. The project, co-funded by LIFAC North America and DOE, is being conducted with the participation of Richmond Power and Light, the State of Indiana, the Electric Power Research Institute (EPRI), and the Black Beauty Coal Company. The project has a total cost of $21.4 million and a duration of 48 months from the preliminary design phase through the testing program.

  5. Trojan Decommissioning Project Cost Performance

    International Nuclear Information System (INIS)

    Michael B. Lackey

    2000-01-01

    The Trojan nuclear plant (Trojan) was an 1160-MW(electric) four-loop pressurized water reactor located in Rainier, Oregon. The plant was permanently shut down in 1993 after ∼17 yr of commercial operation. The early plant closure was an economic decision. The key factors in the closure analysis were escalation of inspection and repair costs associated with steam generator tube cracking and the projected availability of inexpensive replacement power in the Pacific Northwest region of the United States. Since the plant closure, Portland General Electric (PGE) has been actively engaged in decommissioning. The Trojan Decommissioning Project currently has a forecast at completion of $429.7 million (all costs are in millions of 1997 dollars, unless otherwise noted). The cost performance of the Trojan Decommissioning Project to date is addressed, as well as the tools that are in place to provide cost control through completion of decommissioning

  6. Final supplement to the final environmental statement related to construction of Skagit Nuclear Power Project, Units 1 and 2: (Docket Nos. STN 50-522 and STN 50-523)

    International Nuclear Information System (INIS)

    1977-04-01

    The proposed action is the issuance of construction permits to the Puget Sound Power and Light Company, Pacific Power and Light Company, Washington Water Power Company and the Portland General Electric Company, for the construction of Skagit Nuclear Power Projects Units 1 and 2 in Skagit County, Washington (about 64 miles north of Seattle and 6 miles ENE of Sedro Woolley). These units are scheduled for commercial service in 1984 and 1986, respectively. The exhaust steam from the turbine-generators will be cooled in condensers which will utilize one hyperbolic-type natural-draft cooling tower per unit to dissipate heat to the atmosphere. Water (106 cfs max.) for the cooling tower makeup (82.4 cfs) and other plant uses will be withdrawn from the Skagit River through Ranney Collectors embedded in the north bank of the river and pumped to the plant through a pipeline about 35,000 ft. long. Cooling tower blowdown (7 cfs max.) from the project and dilution water (20 cfs max.) will flow through a pipeline back to the river where it will be discharged through a diffuser. Approximately 1750 acres of forested and agricultural land will be removed from harvesting for the life of the power plant; 360 acres of this land will be diverted to industrial use. This will affect less than 0.5% of standing forest in Skagit County and 16 acres in cultivated crops and pasturage. Increased siltation of onsite creeks and the Skagit River from construction work and the small amounts of heat and chemicals discharged to the river during plant operation will have insignificant impacts on water quality and aquatic biota due to erosion control efforts and dilution by the large river flow. (16,200 cfs average; 4740 cfs 7-day, 10-yr low). 18 figs

  7. Status and understanding of groundwater quality in the Madera, Chowchilla Study Unit, 2008: California GAMA Priority Basin Project

    Science.gov (United States)

    Shelton, Jennifer L.; Fram, Miranda S.; Belitz, Kenneth; Jurgens, Bryant C.

    2013-01-01

    Groundwater quality in the approximately 860-square-mile Madera and Chowchilla Subbasins (Madera-Chowchilla study unit) of the San Joaquin Valley Basin was investigated as part of the Priority Basin Project of the Groundwater Ambient Monitoring and Assessment (GAMA) Program. The study unit is located in California's Central Valley region in parts of Madera, Merced, and Fresno Counties. The GAMA Priority Basin Project is being conducted by the California State Water Resources Control Board in collaboration with the U.S. Geological Survey (USGS) and the Lawrence Livermore National Laboratory. The Project was designed to provide statistically robust assessments of untreated groundwater quality within the primary aquifer systems in California. The primary aquifer system within each study unit is defined by the depth of the perforated or open intervals of the wells listed in the California Department of Public Health (CDPH) database of wells used for municipal and community drinking-water supply. The quality of groundwater in shallower or deeper water-bearing zones may differ from that in the primary aquifer system; shallower groundwater may be more vulnerable to contamination from the surface. The assessments for the Madera-Chowchilla study unit were based on water-quality and ancillary data collected by the USGS from 35 wells during April-May 2008 and water-quality data reported in the CDPH database. Two types of assessments were made: (1) status, assessment of the current quality of the groundwater resource, and (2) understanding, identification of natural factors and human activities affecting groundwater quality. The primary aquifer system is represented by the grid wells, of which 90 percent (%) had depths that ranged from about 200 to 800 feet (ft) below land surface and had depths to the top of perforations that ranged from about 140 to 400 ft below land surface. Relative-concentrations (sample concentrations divided by benchmark concentrations) were used for

  8. Safety evaluation report related to the operation of South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499)

    International Nuclear Information System (INIS)

    1987-07-01

    In April 1986 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0781) regarding the application of Houston Lighting and Power Company (applicant and agent for the owners) for a license to operate South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499). The facility is located in Matagorda County, Texas, west of the Colorado River, 8 miles north-northwest of the town of Matagorda and about 89 miles southwest of Houston. The first supplement to NUREG-0781 was issued in September 1986, the second supplement in January 1987, and the third supplement in May 1987. This fourth supplement reports on the status of unresolved items in the Safety Evaluation Report and resolves all the issues necessary to support the issuance of a low-power license

  9. Safety Evaluation Report related to the operation of South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499)

    International Nuclear Information System (INIS)

    1986-04-01

    The Safety Evaluation Report for the application filed by Houston Lighting and Power Company, City Public Service Board of San Antonio, Central Power and Light Company, and the City of Austin, as applicants and owners, for licenses to operate the South Texas Project Units 1 and 2 (Docket Nos. 50-498 and 50-499) has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Matagorda County, Texas, west of the Colorado River, 8 miles north-northwest of the town of Matagorda and about 89 miles southwest of Houston. Subject to resolution of the items discussed in this report, the staff concludes that the applicant can operate the facility without endangering the health and safety of the public

  10. Chernobyl risk reduction via ventilation stack repair: a successful international project

    International Nuclear Information System (INIS)

    Gore, B.F.; Glukhov, A.Y.; Schmidt, J.P.; Vargo, G.I.; Osterloh, J.V.; Kupny, V.I.; Korneev, A.A.; Matvejev, Y.A.

    1999-01-01

    The recently completed project to repair the ChNPP Unit 3/4 ventilation stack is the first international project providing a direct physical improvement and safety upgrade at the Shelter (Ukrytie) facility. The 1986 explosion at Chernobyl NPP Unit 4 severely damaged the ventilation stack framework of bracing and its foundation. At one node, where six elements of the framework joined together, one element was completely missing one element was torn from the node and left hanging from its other end, and one element was badly bent and dented. Foundation supports were knocked measurably off plumb. Repair of the ChNPP ventilation stack is the first international project providing direct physical improvement and safety upgrade at the Shelter facility. The repairs have restored the stack to full design strength, from an emergency condition with a high probability of collapse

  11. Integrating Project Portfolio With Business Strategy: Imagineering

    Directory of Open Access Journals (Sweden)

    Cesar Buaes Dal Maso

    2015-12-01

    Full Text Available Aligning project management to the strategy of a big company is a difficult job. Through Imagineering (the business department and project management program, The Walt Disney Company has done this alignment in an exemplary way. Using a theoretical investigation, this study analyzed the Imagineering as a reference in strategic management of global projects through Disney´s business portfolio, a global benchmarking and with Malmberg et al. (2010 as a company guide. As the main results of the correlations carried out, it was noted that the Imagineers who work in project teams apply tools and techniques with a strategic vision focused on differentiation, generating value, and mixing imagination with technical capacity. The Blue Sky department and its integrated units make possible the creation and deployment of the attractions, the theme parks, hotels, resorts and the Disney sea cruises, demonstrating in this way, to be a highly effective project management office.

  12. The Gemini 8-Meter Telescopes Project

    Science.gov (United States)

    Boroson, Todd A.

    1995-05-01

    The Gemini 8-Meter Telescopes Project is an international partnership to build and operate two 8-meter telescopes, one on Mauna Kea, Hawaii, and one on Cerro Pachon, Chile. The telescopes will be international facilities, open to the scientific communities of the six member countries, the United States (50%), the United Kingdom (25%), Canada (15%), Chile (5%), Argentina (2.5%), and Brazil (2.5%). The telescopes are designed to exploit the best atmospheric conditions at these excellent sites. Near diffraction limited performance will be delivered at 2.2 microns and longward, with minimal degradation of the best seeing conditions at shorter wavelengths. The telescopes and facilities are designed to achieve emissivity opportunity. First light for the Mauna Kea telescope is expected in late 1998, and for the Cerro Pachon telescope in mid-2000. This talk will report on construction progress, the instrumental capabilities, and operations strategies being considered. The Gemini 8-meter Telescopes Project is managed by the Association of Universities for Research in Astronomy (AURA), Inc. under a cooperative agreement with the National Science Foundation which serves as executive agency for the Gemini partner countries. U.S. participation in the project is through the U.S. Gemini Program, a division of the National Optical Astronomy Observatories. NOAO is operated by AURA, Inc. under cooperative agreement with the National Science Foundation.

  13. Origins of the Human Genome Project

    Science.gov (United States)

    Cook-Deegan, Robert (Affiliation: Institute of Medicine, National Academy of Sciences)

    1993-07-01

    The human genome project was borne of technology, grew into a science bureaucracy in the United States and throughout the world, and is now being transformed into a hybrid academic and commercial enterprise. The next phase of the project promises to veer more sharply toward commercial application, harnessing both the technical prowess of molecular biology and the rapidly growing body of knowledge about DNA structure to the pursuit of practical benefits. Faith that the systematic analysis of DNA structure will prove to be a powerful research tool underlies the rationale behind the genome project. The notion that most genetic information is embedded in the sequence of CNA base pairs comprising chromosomes is a central tenet. A rough analogy is to liken an organism's genetic code to computer code. The coal of the genome project, in this parlance, is to identify and catalog 75,000 or more files (genes) in the software that directs construction of a self-modifying and self-replicating system -- a living organism.

  14. 24 CFR 983.54 - Prohibition of assistance for units in subsidized housing.

    Science.gov (United States)

    2010-04-01

    ..., DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT PROJECT-BASED VOUCHER (PBV) PROGRAM Selection of PBV Owner... PBV assistance to units in any of the following types of subsidized housing: (a) A public housing... operating costs of the housing; (e) A unit subsidized with Section 236 rental assistance payments (12 U.S.C...

  15. Facilitating Students' Conceptual Change and Scientific Reasoning Involving the Unit of Combustion

    Science.gov (United States)

    Lee, Chin-Quen; She, Hsiao-Ching

    2010-01-01

    This article reports research from a 3 year digital learning project to unite conceptual change and scientific reasoning in the learning unit of combustion. One group of students had completed the course combining conceptual change and scientific reasoning. The other group of students received conventional instruction. In addition to the…

  16. Newspaper Coverage of the Harvard Medicare Project: Regional Distinctions/Discreet Disregard?

    Science.gov (United States)

    Payne, J. Gregory

    A study examined American newspaper coverage of the Harvard Medicare Project proposal of 1986, a major health policy proposal calling for comprehensive reforms in the national health program. Using Burrelle's news clipping service which includes every daily newspaper (over 1500) in the United States, all 75 newspaper articles on the project from…

  17. The United States needs a WHO health in prisons project.

    Science.gov (United States)

    Weinstein, C

    2010-11-01

    Some facts about imprisonment in the USA are used to justify the comment that US is a country that loves prisons. The lack of provision of rehabilitative type services is stressed and the example of Valley Fever in one area of California demonstrates the public health disasters which can occur with the present arrangements. The organisations concerned with prisons seem to support the idea of prisons as a business. The article is a plea for a WHO health in prisons project as the way forward. Copyright © 2010 The Royal Society for Public Health. Published by Elsevier Ltd. All rights reserved.

  18. Projection display technologies for the new millennium

    Science.gov (United States)

    Kahn, Frederic J.

    2000-04-01

    Although analog CRTs continue to enable most of the world's electronic projection displays such as US consumer rear projection televisions, discrete pixel (digital) active matrix LCD and DLP reflective mirror array projectors have rapidly created large nonconsumer markets--primarily for business. Recent advances in image quality, compactness and cost effectiveness of digital projectors have the potential to revolutionize major consumer and entertainment markets as well. Digital penetration of the mainstream consumer projection TV market will begin in the hear 2000. By 2005 digital projection HDTVs could take the major share of the consumer HDTV projection market. Digital projection is expected to dominate both the consumer HDTV and the cinema market by 2010, resulting in potential shipments for all projection markets exceeding 10 M units per year. Digital projection is improving at a rate 10X faster than analog CRT projectors and 5X faster than PDP flat panels. Continued rapid improvement of digital projection is expected due to its relative immaturity and due to the wide diversity of technological improvements being pursued. Key technology enablers are the imaging panels, light sources and micro-optics. Market shares of single panel projectors, MEMs panels, LCOS panels and low T p-Si TFT LCD panel variants are expected to increase.

  19. Field Evaluation of the Performance of the RTU Challenge Unit: Daikin Rebel

    Energy Technology Data Exchange (ETDEWEB)

    Katipamula, Srinivas [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wang, W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ngo, Hung [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Underhill, Ronald M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-05-31

    Packaged rooftop air-conditioning units (RTUs) are used in 44% (2.5 million) of all commercial buildings, serving over 57% (46 billion square feet) of the commercial building floor space in the United States (EIA 2012). The primary energy consumption associated with RTUs is over 2.2 quads annually. Therefore, even a small improvement in efficiency or part-load operation of these units can lead to significant reductions in energy use and carbon emissions. Starting in 2011, the U.S. Department of Energy’s (DOE’s) Building Technologies Office funded a series of projects related to RTUs. Some projects were intended to improve the operating efficiency of the existing RTUs, while others were focused on improving the operating efficiency of new units. This report documents the field-testing and comparison of the seasonal efficiency of a state-of-art RTU Challenge unit and a standard unit. Section II provides the background for the work. Section III describes the measurement and verification plan for the field tests. Section IV describes the measurement and verification evaluation plan. The results are described in Section V. The lessons learned and recommendations for future work are presented in Section VI. A list of references is provided in Section VII.

  20. Development of a Hydronic Rooftop Unit-HyPak-MA

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Eric; Berman, Mark

    2009-11-14

    The majority of U.S. commercial floor space is cooled by rooftop HVAC units (RTUs). RTU popularity derives chiefly from their low initial cost and relative ease of service access without disturbing building occupants. Unfortunately, current RTUs are inherently inefficient due to a combination of characteristics that unnecessarily increase cooling loads and energy use. 36% percent of annual U.S. energy, and two-thirds of electricity, is consumed in and by buildings. Commercial buildings consume approximately 4.2 quads of energy each year at a cost of $230 billion per year, with HVAC equipment consuming 1.2 quads of electricity. More than half of all U.S. commercial floor space is cooled by packaged HVAC units, most of which are rooftop units (RTUs). Inefficient RTUs create an estimated 3.5% of U.S. CO{sub 2} emissions, thus contributing significantly to global warming5. Also, RTUs often fail to maintain adequate ventilation air and air filtration, reducing indoor air quality. This is the second HyPak project to be supported by DOE through NETL. The prior project, referred to as HyPak-1 in this report, had two rounds of prototype fabrication and testing as well as computer modeling and market research. The HyPak-1 prototypes demonstrated the high performance capabilities of the HyPak concept, but made it clear that further development was required to reduce heat exchanger cost and improve system reliability before HyPak commercialization can commence. The HyPak-1 prototypes were limited to about 25% ventilation air fraction, limiting performance and marketability. The current project is intended to develop a 'mixed-air' product that is capable of full 0-100% modulation in ventilation air fraction, hence it was referred to as HyPak-MA in the proposal. (For simplicity, the -MA has been dropped when referencing the current project.) The objective of the HyPak Project is to design, develop and test a hydronic RTU that provides a quantum improvement over

  1. Outcomes of care for 16,924 planned home births in the United States: the Midwives Alliance of North America Statistics Project, 2004 to 2009.

    Science.gov (United States)

    Cheyney, Melissa; Bovbjerg, Marit; Everson, Courtney; Gordon, Wendy; Hannibal, Darcy; Vedam, Saraswathi

    2014-01-01

    Between 2004 and 2010, the number of home births in the United States rose by 41%, increasing the need for accurate assessment of the safety of planned home birth. This study examines outcomes of planned home births in the United States between 2004 and 2009. We calculated descriptive statistics for maternal demographics, antenatal risk profiles, procedures, and outcomes of planned home births in the Midwives Alliance of North American Statistics Project (MANA Stats) 2.0 data registry. Data were analyzed according to intended and actual place of birth. Among 16,924 women who planned home births at the onset of labor, 89.1% gave birth at home. The majority of intrapartum transfers were for failure to progress, and only 4.5% of the total sample required oxytocin augmentation and/or epidural analgesia. The rates of spontaneous vaginal birth, assisted vaginal birth, and cesarean were 93.6%, 1.2%, and 5.2%, respectively. Of the 1054 women who attempted a vaginal birth after cesarean, 87% were successful. Low Apgar scores (home births in the United States, outcomes are congruent with the best available data from population-based, observational studies that evaluated outcomes by intended place of birth and perinatal risk factors. Low-risk women in this cohort experienced high rates of physiologic birth and low rates of intervention without an increase in adverse outcomes. © 2014 by the American College of Nurse-Midwives.

  2. Cost Indexing and Unit Price Adjustments for Construction Materials

    Science.gov (United States)

    2012-10-30

    This project was focused on the assimilation of information regarding unit price adjustment clauses, or PACs, : that are offered for construction materials at the state Departments of Transportation (DOTs). It is intended to : provide the South Carol...

  3. Obesity: A United States Strategic Imperative

    Science.gov (United States)

    2013-04-01

    States Department of Veterans Affairs 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) Dr. Thomas ...Army Ms. Karen Malebranche United States Department of Veterans Affairs Project Adviser Dr. Thomas Williams U.S. Army War...per American has increased by 57 pounds per year ( poultry representing 46 pounds).86 Surprisingly however, the percentage of calories from meat

  4. Steam generator replacement in Bruce A Unit 1 and Unit 2

    International Nuclear Information System (INIS)

    Hart, R.S.

    2006-01-01

    and Unit 2 SGR employs a Medium Lift Crane (MLC) located at ground elevation north of the powerhouse to perform all heavy lifts within the reactor buildings, including relocation of the steam drums and removal and replacement of the Steam Generators, through openings created in the reactor building roof structures. Following the removal of components and systems that interfere with SG replacement activities, the connections between the Steam Generators and the steam drums are severed, the roof of the concrete SD enclosure and the steam drum cooling system are removed, and the steam drums are lifted from the steam drum enclosures and placed on temporary supports to the reactor side of the steam drum enclosures by the MLC. The old Steam Generators are then removed and the replacement Steam Generators are installed through the reactor building roof openings by the MLC. The steam drums and all piping connections and equipment will be reinstalled following the installation of the Replacement Steam Generators to establish the 'as found' condition. The replacement of the eight Steam Generators in each unit is a major part of the Unit 1 and Unit 2 rehabilitation program. This work is currently in progress. The Unit 1 and Unit 2 Steam Generator replacement is a 'first-of-a-kind' project. These are the first CANDU Steam Generators to be replaced, and the horizontal steam drum configuration is unique to Bruce A. This paper provides an overview of the Unit 1 and Unit 2 Steam Generator replacement methodology developed and being employed by SLN. (author)

  5. The international remote monitoring project and implication

    International Nuclear Information System (INIS)

    Sonnier, C.S.; Johnson, C.S.

    1994-01-01

    The future of remote monitoring in International Safeguards system is analyzed. Problems of an update on the International Remote Monitoring Project are considered. The Project allows to remotely transmit safeguards-relevant data directly to IAEA from nuclear facilities worldwide. Description of integrated monitoring system (IMS) is given. A key element of state-of-art of IMS is modular nodal system which accepts information from sensors and provides information to both a data storage unit and a transmitter. Remote Monitoring Systems of Australia and Sweden are presented. 3 figs

  6. Hunger in Our World: A Social Studies Unit.

    Science.gov (United States)

    Totten, Sam

    1984-01-01

    Describes activities of a unit on world hunger which include presenting a lexicon, topic overview, and guest speakers; reading topically related novels; creating scrapbooks; discussing pertinent quotations; exploring government role in ameliorating hunger; and completing final papers or projects. Resource materials are listed, including pertinent…

  7. Hong Kong's health spending projections through 2033.

    Science.gov (United States)

    Leung, Gabriel M; Tin, Keith Y K; Chan, Wai-Sum

    2007-04-01

    To derive actuarial projection estimates of Hong Kong's total domestic health expenditure to the year 2033. Disaggregating health expenditure by age, sex, unit cost and utilisation level, we estimated future health spending by projecting utilisation (by public/private, inpatient/outpatient care) to reflect demographic changes and associated increase in demand (from higher expectations and greater intensity of care), and then multiplying such by the projected unit costs (incorporating the impact of key cost drivers such as public expectations, technological changes and potential productivity gains) to obtain total expenditure estimates. The model was most sensitive to the excess health care price inflation rate, i.e. the annual price/cost growth of medical goods and services over and above per capita GDP growth. Population ageing and growth per se, without taking into account related technologic innovation for chronic conditions that particularly afflict older adults, contribute relatively little to overall spending growth. Given the model assumptions, it is possible to limit total health spending to below 10% of GDP by 2033, where the public share would gradually decline from the current 57% to between 46% and 49%. Expenditure control through global budgeting, technology assessment and demand-side constraints should be considered although their effectiveness remains inconclusive.

  8. Implementing a Zero Energy Ready Home Multifamily Project

    Energy Technology Data Exchange (ETDEWEB)

    Springer, David [Alliance for Residential Building Innovation, Davis, CA (United States); German, Alea [Alliance for Residential Building Innovation, Davis, CA (United States)

    2015-08-01

    An objective of this project was to gain a highly visible foothold for residential buildings built to the U.S. Department of Energy's Zero Energy Ready Home (ZERH) specification that can be used to encourage participation by other California builders. This report briefly describes two single family homes that were ZERH-certified, and focuses on the experience of working with developer Mutual Housing on a 62 unit multi-family community at the Spring Lake subdivision in Woodland, CA. The Spring Lake project is expected to be the first ZERH certified multi-family project nationwide. This report discusses challenges encountered, lessons learned, and how obstacles were overcome.

  9. Unit: Petroleum, Inspection Pack, National Trial Print.

    Science.gov (United States)

    Australian Science Education Project, Toorak, Victoria.

    This is a National Trial Print of a unit on petroleum developed for the Australian Science Education Project. The package contains the teacher's edition of the written material and a script for a film entitled "The Extraordinary Experience of Nicholas Nodwell" emphasizing the uses of petroleum and petroleum products in daily life and…

  10. Top level risk study for units 1 to 4 at NPP Kozloduy

    International Nuclear Information System (INIS)

    Shishkova, I.

    1997-01-01

    The first Top Level Study of NPP Kozloduy Units 1/4 was started in 1991 and completed in March 1992 by BEQE. The Primary objective of the project was to provide in a short term a tool for quantified comparison of the relative risk benefits that various design or operational modifications would have if implemented on NPP Kozloduy Units 1/4. This original version of the Study was reviewed by the IAEA who agreed in general with the conclusions indicating that the report provides valuable insights which should be used in the decision making process. The IAEA made suggestion for some changes. These comments were taken into account in the subsequent version. In early 1994 the new version was issued. The objective of this second project, in addition to revising the original study to reflect the IAEA comments, was to address the potential benefits from further improvements at NPP Kozloduy. The work on the second version was going on in parallel with the activities carried out in the mainframe of several NPP Kozloduy Units 1/4 Upgrading Program (WANO Six-Month Program, Program for the NPP Kozloduy Units 1-4 Upgrading, Twinning Program, etc.). And at last, a Top-Level Probabilistic Safety Study was carried out by EQE - Bulgaria and completed early in 1995 at the request of NPP Kozloduy. The objective of the project was the contribution of the different activities performed in the mainframe of the Program for the NPP Kozloduy Units 1-4 Safety Upgrading in the overall safety improvement to be assessed. 3 figs, 1 tab

  11. Technological Innovation Projects: Proposal For an Integrative Model Between Project Management and Knowledge Management in a Customer-Supplier Perspective

    Directory of Open Access Journals (Sweden)

    Edval da Silva Tavares

    2014-10-01

    Full Text Available In face of strong competition, companies in Brazil have increased their financial investments in automation, offering new products and services and reducing operating costs. These companies are focusing their efforts on core competencies and, therefore, they often lack the internal expertise to implement new projects, especially those that bring technological innovation. For this reason, we use the processes of outsourcing or subcontracting to help implement such projects. The unit of analysis in this study is the project and the object of the study to analyze the process of knowledge transfer from a provider to a customer during the duration of the project, which involves new technologies. The main motivation of this work is to address the acquisition and retention of new knowledge related to projects designed for business customers. We have developed a study of three cases of multiple financial firms that buy new technologies and two suppliers of information technology. As a practical result, a management model of knowledge transfer and retention of knowledge in client companies is proposed and incorporated into project management.

  12. Dissemination and Exploitation: Project Goals beyond Science

    Science.gov (United States)

    Hamann, Kristin; Reitz, Anja

    2017-04-01

    Dissemination and Exploitation are essential parts of public funded projects. In Horizon 2020 a plan for the exploitation and dissemination of results (PEDR) is a requirement. The plan should contain a clear vision on the objectives of the project in relation to actions for dissemination and potential exploitation of the project results. The actions follow the basic idea to spread the knowledge and results gathered within the project and face the challenge of how to bring the results into potentially relevant policy circle and how they impact the market. The plan follows the purpose to assess the impact of the project and to address various target groups who are interested in the project results. Simply put, dissemination concentrates on the transfer of knowledge and exploitation on the commercialization of the project. Beyond the question of the measurability of project`s impact, strategies within science marketing can serve purposes beyond internal and external communication. Accordingly, project managers are facing the challenge to implement a dissemination and exploitation strategy that ideally supports the identification of all partners with the project and matches the current discourse of the project`s content within the society, politics and economy. A consolidated plan might unite all projects partners under a central idea and supports the identification with the project beyond the individual research questions. Which applications, strategies and methods can be used to bring forward a PEDR that accompanies a project successfully and allows a comprehensive assessment of the project afterwards? Which hurdles might project managers experience in the dissemination process and which tasks should be fulfilled by the project manager?

  13. Readings in Wildlife and Fish Conservation, High School Conservation Curriculum Project.

    Science.gov (United States)

    Ensminger, Jack

    This publication is a tentative edition of readings on Wildlife and Fish Conservation in Louisiana, and as such it forms part of one of the four units of study designed for an experimental high school course, the "High School Conservation Curriculum Project." The other three units are concerned with Forest Conervation, Soil and Water…

  14. A Unit-Test Framework for Database Applications

    DEFF Research Database (Denmark)

    Christensen, Claus Abildgaard; Gundersborg, Steen; de Linde, Kristian

    The outcome of a test of an application that stores data in a database naturally depends on the state of the database. It is therefore important that test developers are able to set up and tear down database states in a simple and efficient manner. In existing unit-test frameworks, setting up...... test can be minimized. In addition, the reuse between unit tests can speed up the execution of test suites. A performance test on a medium-size project shows a 40% speed up and an estimated 25% reduction in the number of lines of test code....

  15. Challenges on preparing unitization agreements in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro, Marilda Rosado de Sa [Universidade do Estado do Rio de Janeiro (UERJ), RJ (Brazil). Faculdade de Direito; Appi, Valeria Tiriba [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2004-07-01

    As a further stage of the new oil and gas industry in Brazil, various challenges are now faced as an outcome from the O and G projects progress, under the legal framework in force in Brazil. Among all are the first unitization processes, which require a set of steps to be performed in order to achieve a unitization agreement. The paper aims at analyzing the legal, technical and drafting issues to be dealt with in such agreements. After a brief introduction to the general issues at stake in the unitization agreements the study shall encompass a follow up of the sequence of events to be complied with. One could mention the settlement of the criteria onto calculations to serve as guidelines for the negotiations will be based on. That, is usually based on concepts as oil in place, possible O and G in the reservoir, or reserve, which must be agreed by all involved parties. Another possible step to be considered is the creation of a common database, in order to permit fast decisions and optimise E and P operations in the unitized area. Other concerns should be addressed, depending on the amount of O and G to be produced from the unitized area, as: the avoidance of multiple redeterminations aiming to decrease unnecessary expenditures, which could jeopardize the arising project profitability; and the recalculations of Government take, royalties and other incumbencies, to be shared by all involved parties. The paper shall also mention the experience of other countries trying to adopt, where applicable and compatible with the best practices of the oil industry, solutions adopted where tradition in oil and gas is more mature. It should be considered that, in each bidding round the Brazilian Concession Agreement has undergone changes, therefore during an unitization process with two different versions of the Concession Agreement differences between corresponding clauses will have to be faced. Comments should also be made about satellite agreements, encompassing O and G buying

  16. HDS unit revamp and operating experience

    Energy Technology Data Exchange (ETDEWEB)

    Reinhardt, J. [Veba Oel Verarbeitungs-GmbH, Gelsenkirchen (Germany); Balfanz, U. [Aral Forschung, Gelsenkirchen (Germany); Dimmig, T. [TU Bergakademie Freiberg, Freiberg (Germany)

    2002-12-01

    Ruhr Oel GmbH, a joint venture between BP and PDVSA, operates a HDS unit at its Gelsenkirchen-Scholven site. The unit produces a major blend component for diesel fuel. Driven by ambitious German environmental policy and by an agreement between the German car and oil industries on the one hand and the government on the other, more stringent low sulphur fuel specifications will be enforced in Germany much earlier than in the rest of the European Union. In view of this situation a project was developed to fulfill the new product specifications with minimum investment. In a joint effort involving the refinery, the company research facilities and the catalyst supplier (AKZO NOBEL), pilot plant tests were performed to develop the best catalyst system and the new process conditions. Based on these results, an existing HDS unit was accordingly revamped. After the revamp, the unit produced diesel fuel with 50 ppm sulphur content and furthermore test runs at 10 ppm were carried out successfully. These results are displayed in this article. (orig.)

  17. High luminance LCD projection TV, 40ZIP; Kokido ekisho projection terebi 40ZIP

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    A 40 type LCD projection TV was commercialized which utilized the characteristics of a `large screen`, `saved space` and `light weight` incident to an LCD projection system and which succeeded `a television benign to people`, the concept of a flat wide television FACE{sub TM}. The main features are as follows:(1) A bright-in-every-corner and high-definition picture realized by employing a 2.7 type low temperature polysilicon LCD panel, high performance optical unit, wide angle of visibility, and high contrast screen. (2) A slim design for a 40 type large screen (compared with conventional models at Toshiba) having a depth comparable to that of 14 type and a mass equivalent to that of 25 type.(3) A PC input terminal most suitable for presentation. (translated by NEDO)

  18. Safety Evaluation Report related to the operation of South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499). Supplement No. 1

    International Nuclear Information System (INIS)

    1986-09-01

    In April 1986 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0781) regarding the application of Houston Lighting and Power Company (applicant and agent for the owners) for a license to operate South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499). The facility is located in Matagorda County, Texas, west of the Colorado River, 8 miles north-northwest of the town of Matagorda and about 89 miles southwest of Houston. This first supplement to NUREG-0781 reports the status of certain items that remained unresolved at the time the Safety Evaluation Report was published

  19. West Foster Creek Expansion Project 2007 HEP Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul R.

    2008-02-01

    During April and May 2007, the Columbia Basin Fish and Wildlife Authority's (CBFWA) Regional HEP Team (RHT) conducted baseline Habitat Evaluation Procedures (HEP) (USFWS 1980, 1980a) analyses on five parcels collectively designated the West Foster Creek Expansion Project (3,756.48 acres). The purpose of the HEP analyses was to document extant habitat conditions and to determine how many baseline/protection habitat units (HUs) to credit Bonneville Power Administration (BPA) for funding maintenance and enhancement activities on project lands as partial mitigation for habitat losses associated with construction of Grand Coulee and Chief Joseph Dams. HEP evaluation models included mule deer (Odocoileus hemionus), western meadowlark (Sturnella neglecta), sharp-tailed grouse, (Tympanuchus phasianellus), Bobcat (Lynx rufus), mink (Neovison vison), mallard (Anas platyrhynchos), and black-capped chickadee (Parus atricapillus). Combined 2007 baseline HEP results show that 4,946.44 habitat units were generated on 3,756.48 acres (1.32 HUs per acre). HEP results/habitat conditions were generally similar for like cover types at all sites. Unlike crediting of habitat units (HUs) on other WDFW owned lands, Bonneville Power Administration received full credit for HUs generated on these sites.

  20. Yeager Airport Hydrogen Vehicle Test Project

    Energy Technology Data Exchange (ETDEWEB)

    Davis, Williams [West Virginia University Research Corporation, Morgantown, WV (United States)

    2015-10-01

    The scope of this project was changed during the course of the project. Phase I of the project was designed to have the National Alternative Fuels Training Consortium (NAFTC), together with its partners, manage the Hydrogen Vehicle Test Project at the Yeager Airport in conjunction with the Central West Virginia Regional Airport Authority (CWVRAA) in coordination with the United States Department of Energy National Energy Technology Laboratory (U.S. DOE NETL). This program would allow testing and evaluation of the use of hydrogen vehicles in the state of West Virginia utilizing the hydrogen fueling station at Yeager Airport. The NAFTC and CWVRAA to raise awareness and foster a greater understanding of hydrogen fuel and hydrogen-powered vehicles through a targeted utilization and outreach and education effort. After initial implementation of the project, the project added, determine the source(s) of supply for hydrogen powered vehicles that could be used for the testing. After completion of this, testing was begun at Yeager Airport. During the course of the project, the station at Yeager Airport was closed and moved to Morgantown and the West Virginia University Research Corporation. The vehicles were then moved to Morgantown and a vehicle owned by the CWVRAA was purchased to complete the project at the new location. Because of a number of issues detailed in the report for DE-FE0002994 and in this report, this project did not get to evaluate the effectiveness of the vehicles as planned.

  1. Integrated Co-management of Lakes through Beach Management Units

    OpenAIRE

    Goverment of Uganda; Department for International Development (DFID) of the UK Government

    2007-01-01

    Metadata only record In 1999, the Integrated Co-management of Lakes through Beach Management Units project was started in an effort to implement a new approach to the management of lake resources in Uganda. The main components of this plan involved decentralization, local community management, and improving the livelihood of the poor. In order to finance the management of these areas, the Beach Management Units (BMU's) are charging user fees to those individuals who obtain benefit from the...

  2. Opposition multiple objective symbiotic organisms search (OMOSOS for time, cost, quality and work continuity tradeoff in repetitive projects

    Directory of Open Access Journals (Sweden)

    Duc-Hoc Tran

    2018-04-01

    Full Text Available Construction managers often face with projects containing multiple units wherein activities repeat from unit to unit. Therefore effective resource management is crucial in terms of project duration, cost and quality. Accordingly, researchers have developed several models to aid planners in developing practical and near-optimal schedules for repetitive projects. Despite their undeniable benefits, such models lack the ability of pure simultaneous optimization because existing methodologies optimize the schedule with respect to a single factor, to achieve minimum duration, total cost, resource work breaks or various combinations, respectively. This study introduces a novel approach called “opposition multiple objective symbiotic organisms search” (OMOSOS for scheduling repetitive projects. The proposed algorithm used an opposition-based learning technique for population initialization and for generation jumping. Further, this study integrated a scheduling module (M1 to determine all project objectives including time, cost, quality and interruption. The proposed algorithm was implemented on two application examples in order to demonstrate its capabilities in optimizing the scheduling of repetitive construction projects. The results indicate that the OMOSOS approach is a powerful optimization technique and can assist project managers in selecting appropriate plan for project. Keywords: Symbiotic organisms search, Multi-objective analysis, Resource tradeoff, Schedules, Repetitive

  3. Energy efficiency and pollution control for thermal units in the Egyptian industry

    International Nuclear Information System (INIS)

    Said Abdel-wahab; Ismail, W.M.

    1999-01-01

    Energy conservation and environmental protection project (ECEP) is a Usaid sponsored project. Its main objective is to promote energy conservation and pollution protection in the egyptian industry through a group of demonstrated projects. One of the implemented activities is the boilers and furnaces tune-up program, which aims to increase energy efficiency and reduce pollution. To achieve this objective. (ECEP) distributed 100 electronic portable exhaust gas analyzers to cover eight industrial sectors at six different geographical locations in egypt. These analyzers were used to measure the contents of exhaust gases to help operators tune up their equipment on regular basis. The result is that the firing thermal units operate at the highest possible combustion efficiency to reduce the amount of fuel consumption as well as pollution emissions. The analyzer used measures two types of temperature, five different stack gases, draft and smoke density. moreover it computes the efficiency of combustion as well as Co2 and excess air percentage. Thermal units that rested by these analyzers were consuming a huge amount of fossil fuel from different types. The average combustion efficiency for thermal units tested was improved by 14%, 15% and 28% for boilers, furnaces and diesel respectively

  4. Vortex structure in abelian-projected lattice gauge theory

    International Nuclear Information System (INIS)

    Ambjoern, J.; Giedt, J.; Greensite, J.

    2000-01-01

    We report on a breakdown of both monopole dominance and positivity in abelian-projected lattice Yang-Mills theory. The breakdown is associated with observables involving two units of the abelian charge. We find that the projected lattice has at most a global Z 2 symmetry in the confined phase, rather than the global U(1) symmetry that might be expected in a dual superconductor or monopole Coulomb gas picture. Implications for monopole and center vortex theories of confinement are discussed

  5. Phoenix's Wet Chemistry Laboratory Units

    Science.gov (United States)

    2008-01-01

    This image shows four Wet Chemistry Laboratory units, part of the Microscopy, Electrochemistry, and Conductivity Analyzer (MECA) instrument on board NASA's Phoenix Mars Lander. This image was taken before Phoenix's launch on August 4, 2007. The Phoenix Mission is led by the University of Arizona, Tucson, on behalf of NASA. Project management of the mission is by NASA's Jet Propulsion Laboratory, Pasadena, Calif. Spacecraft development is by Lockheed Martin Space Systems, Denver.

  6. Origins of the Human Genome Project.

    Science.gov (United States)

    Watson, J D; Cook-Deegan, R M

    1991-01-01

    The Human Genome Project has become a reality. Building on a debate that dates back to 1985, several genome projects are now in full stride around the world, and more are likely to form in the next several years. Italy began its genome program in 1987, and the United Kingdom and U.S.S.R. in 1988. The European communities mounted several genome projects on yeast, bacteria, Drosophila, and Arabidospis thaliana (a rapidly growing plant with a small genome) in 1988, and in 1990 commenced a new 2-year program on the human genome. In the United States, we have completed the first year of operation of the National Center for Human Genome Research at the National Institutes of Health (NIH), now the largest single funding source for genome research in the world. There have been dedicated budgets focused on genome-scale research at NIH, the U.S. Department of Energy, and the Howard Hughes Medical Institute for several years, and results are beginning to accumulate. There were three annual meetings on genome mapping and sequencing at Cold Spring Harbor, New York, in the spring of 1988, 1989, and 1990; the talks have shifted from a discussion about how to approach problems to presenting results from experiments already performed. We have finally begun to work rather than merely talk. The purpose of genome projects is to assemble data on the structure of DNA in human chromosomes and those of other organisms. A second goal is to develop new technologies to perform mapping and sequencing. There have been impressive technical advances in the past 5 years since the debate about the human genome project began. We are on the verge of beginning pilot projects to test several approaches to sequencing long stretches of DNA, using both automation and manual methods. Ordered sets of yeast artificial chromosome and cosmid clones have been assembled to span more than 2 million base pairs of several human chromosomes, and a region of 10 million base pairs has been assembled for

  7. Advancing high-speed rail policy in the United States.

    Science.gov (United States)

    2012-06-01

    This report builds on a review of international experience with high-speed rail projects to develop recommendations for a High-speed rail policy framework for the United States. The international review looked at the experience of Korea, Taiwan, Chin...

  8. Shadow management applied in the first AP1000 project under the islands contract condition

    International Nuclear Information System (INIS)

    Liu Xiao

    2010-01-01

    As the global first AP1000 nuclear project, Sanmen phase I nuclear project itself has many challenges from design, procurement to construction managements for non practical nuclear project and experience can be referenced. Islands contract pattern was adopted by this project and this contract pattern has its own strength and weakness. Considering the negative influence result from the first unit, this project has the great postpone risk. Shadow management here tries to reduce these risks and enhance the project surveillance and control by the owner to promote the final goal of this project. (authors)

  9. Compositional variation within thick (>10 m) flow units of Mauna Kea Volcano cored by the Hawaii Scientific Drilling Project

    Science.gov (United States)

    Huang, Shichun; Vollinger, Michael J.; Frey, Frederick A.; Rhodes, J. Michael; Zhang, Qun

    2016-07-01

    Geochemical analyses of stratigraphic sequences of lava flows are necessary to understand how a volcano works. Typically one sample from each lava flow is collected and studied with the assumption that this sample is representative of the flow composition. This assumption may not be valid. The thickness of flows ranges from 100 m. Geochemical heterogeneity in thin flows may be created by interaction with the surficial environment whereas magmatic processes occurring during emplacement may create geochemical heterogeneities in thick flows. The Hawaii Scientific Drilling Project (HSDP) cored ∼3.3 km of basalt erupted at Mauna Kea Volcano. In order to determine geochemical heterogeneities in a flow, multiple samples from four thick (9.3-98.4 m) HSDP flow units were analyzed for major and trace elements. We found that major element abundances in three submarine flow units are controlled by the varying proportion of olivine, the primary phenocryst phase in these samples. Post-magmatic alteration of a subaerial flow led to loss of SiO2, CaO, Na2O, K2O and P2O5, and as a consequence, contents of immobile elements, such as Fe2O3 and Al2O3, increase. The mobility of SiO2 is important because Mauma Kea shield lavas divide into two groups that differ in SiO2 content. Post-magmatic mobility of SiO2 adds complexity to determining if these groups reflect differences in source or process. The most mobile elements during post-magmatic subaerial and submarine alteration are K and Rb, and Ba, Sr and U were also mobile, but their abundances are not highly correlated with K and Rb. The Ba/Th ratio has been used to document an important role for a plagioclase-rich source component for basalt from the Galapagos, Iceland and Hawaii. Although Ba/Th is anomalously high in Hawaiian basalt, variation in Ba abundance within a single flow shows that it is not a reliable indicator of a deep source component. In contrast, ratios involving elements that are typically immobile, such as La/Nb, La

  10. 24 CFR 983.207 - Condition of contract units.

    Science.gov (United States)

    2010-04-01

    ... URBAN DEVELOPMENT PROJECT-BASED VOUCHER (PBV) PROGRAM Housing Assistance Payments Contract § 983.207... in accordance with the HQS. The PHA may not make any HAP payment to the owner for a contract unit.... Such remedies include termination of housing assistance payments, abatement or reduction of housing...

  11. Prototype detection unit for the CHIPS experiment

    Science.gov (United States)

    Pfützner, Maciej M.

    2017-09-01

    CHIPS (CHerenkov detectors In mine PitS) is an R&D project aiming to develop novel cost-effective neutrino detectors, focused on measuring the CP-violating neutrino mixing phase (δ CP). A single detector module, containing an enclosed volume of purified water, would be submerged in an existing lake, located in a neutrino beam. A staged approach is proposed with first detectors deployed in a flooded mine pit in Northern Minnesota, 7 mrad off-axis from the existing NuMI beam. A small proof-of-principle model (CHIPS-M) has already been tested and the first stage of a fully functional 10 kt module (CHIPS-10) is planned for 2018. One of the instruments submerged on board of CHIPS-M in autumn 2015 was a prototype detection unit, constructed at Nikhef. The unit contains hardware borrowed from the KM3NeT experiment, including 16 3 inch photomultiplier tubes and readout electronics. In addition to testing the mechanical design and data acquisition, the detector was used to record a large sample of cosmic ray muon events. The collected data is valuable for characterising the cosmic muon background and validating a Monte Carlo simulation used to optimise future designs. This paper introduces the CHIPS project, describes the design of the prototype unit, and presents the results of a preliminary data analysis.

  12. 75 FR 65615 - Conditional Commitment for a Federal Loan Guarantee for Project Financing for Southwest Intertie...

    Science.gov (United States)

    2010-10-26

    ... DEPARTMENT OF ENERGY Conditional Commitment for a Federal Loan Guarantee for Project Financing for... based on the analysis in the Final Environmental Impact Statement for Project Financing for Southwest... support of debt financing for transmission infrastructure investment projects located in the United States...

  13. The 1987 United Kingdom radioactive waste inventory

    International Nuclear Information System (INIS)

    1988-10-01

    This report describes the stocks of radioactive wastes in the United Kingdom, together with projections of future arisings. Operational and decommissioning wastes are considered for both committed and prospective plant. Arisings are from power reactors, commercial reprocessing, fuel manufacture, medical and industrial sources and research and development. Data are presented for the wastes in their raw form and as conditioned for disposal. The data which refer to the situation on 1.1.87 are shown by producer and globally, in summary tables. The information presented for each producer includes a description of the activities that generate the wastes and a discussion of how stocks and arisings may have changed from earlier predictions. This is supplemented by a stream by stream tabulation showing the waste type, volume, density, conditioning factor and gross alpha and beta activity. The global projections are presented in tabular and graphical manner, and the changes from earlier projections are discussed. The scenarios which underly the projections are also presented. (author)

  14. PREPS2 - a PC-based computer program for performing economic analysis of capital projects

    International Nuclear Information System (INIS)

    Blake, M.W.; Brand, D.O.; Chastain, E.T.; Johnson, E.D.

    1990-01-01

    In these times of increased spending to finance new capacity and to meet clean air act legislation, many electric utilities are giving a high priority to controlling capital expenditures at existing generating facilities. Determining the level of capital expenditures which are economically justified is very difficult; units which have higher capacity factors are worth more to the utility. Therefore, the utility can more readily justify higher capital expenditures to improve or maintain reliability and heat rate than on units with lower capacity factors. This paper describes a PC-based computer program (PREPS2) which performs an economic analysis of individual capital projects. The program incorporates tables which describe the worth to the system of making improvements in each unit. This computer program is currently being used by the six Southern Company operating companies to evaluate all production capital projects over $50,000. Approximately 500 projects representing about $300 million are being analyzed each year

  15. Projecting Electricity Demand in 2050

    Energy Technology Data Exchange (ETDEWEB)

    Hostick, Donna J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Belzer, David B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hadley, Stanton W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Markel, Tony [National Renewable Energy Lab. (NREL), Golden, CO (United States); Marnay, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Kintner-Meyer, Michael C. W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-07-01

    This paper describes the development of end-use electricity projections and load curves that were developed for the Renewable Electricity (RE) Futures Study (hereafter RE Futures), which explored the prospect of higher percentages (30% - 90%) of total electricity generation that could be supplied by renewable sources in the United States. As input to RE Futures, two projections of electricity demand were produced representing reasonable upper and lower bounds of electricity demand out to 2050. The electric sector models used in RE Futures required underlying load profiles, so RE Futures also produced load profile data in two formats: 8760 hourly data for the year 2050 for the GridView model, and in 2-year increments for 17 time slices as input to the Regional Energy Deployment System (ReEDS) model. The process for developing demand projections and load profiles involved three steps: discussion regarding the scenario approach and general assumptions, literature reviews to determine readily available data, and development of the demand curves and load profiles.

  16. The Stripa project in a Swedish waste management perspective

    International Nuclear Information System (INIS)

    Bjurstroem, S.

    1994-01-01

    This publication deals with the Swedish nuclear waste management program till the 60s; it also consists of a presentation of the Stripa Project, that played a important role in the research development work in Sweden. This project was carried out in collaboration with the United States, and an international participation was organized. The primary goals of this project were to develop scientific techniques to characterize a granite rock. The issues of such studies were of common concern to many countries that had research and development programs on the disposal of high-level radioactive wastes. (TEC)

  17. Basic Research about Calculation of the Decommissioning Unit Cost based on The KRR-2 Decommissioning Project

    Energy Technology Data Exchange (ETDEWEB)

    Song, Chan-Ho; Park, Hee-Seong; Ha, Jea-Hyun; Jin, Hyung-Gon; Park, Seung-Kook [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-05-15

    The KAERI be used to calculate the decommissioning cost and manage the data of decommissioning activity experience through systems such as the decommissioning information management system (DECOMMIS), Decommissioning Facility Characterization DB System (DEFACS), decommissioning work-unit productivity calculation system (DEWOCS). Some country such as Japan and The United States have the information for decommissioning experience of the NPP and publish reports on decommissioning cost analysis. These reports as valuable data be used to compare with the decommissioning unit cost. In particular, need a method to estimate the decommissioning cost of the NPP because there is no decommissioning experience of NPP in case of Korea. makes possible to predict the more precise prediction about the decommissioning unit cost. But still, there are many differences on calculation for the decommissioning unit cost in domestic and foreign country. Typically, it is difficult to compare with data because published not detailed reports. Therefore, field of estimation for decommissioning cost have to use a unified framework in order to the decommissioning cost be provided to exact of the decommissioning cost.

  18. Basic Research about Calculation of the Decommissioning Unit Cost based on The KRR-2 Decommissioning Project

    International Nuclear Information System (INIS)

    Song, Chan-Ho; Park, Hee-Seong; Ha, Jea-Hyun; Jin, Hyung-Gon; Park, Seung-Kook

    2015-01-01

    The KAERI be used to calculate the decommissioning cost and manage the data of decommissioning activity experience through systems such as the decommissioning information management system (DECOMMIS), Decommissioning Facility Characterization DB System (DEFACS), decommissioning work-unit productivity calculation system (DEWOCS). Some country such as Japan and The United States have the information for decommissioning experience of the NPP and publish reports on decommissioning cost analysis. These reports as valuable data be used to compare with the decommissioning unit cost. In particular, need a method to estimate the decommissioning cost of the NPP because there is no decommissioning experience of NPP in case of Korea. makes possible to predict the more precise prediction about the decommissioning unit cost. But still, there are many differences on calculation for the decommissioning unit cost in domestic and foreign country. Typically, it is difficult to compare with data because published not detailed reports. Therefore, field of estimation for decommissioning cost have to use a unified framework in order to the decommissioning cost be provided to exact of the decommissioning cost

  19. A Behavioral Analysis of the Laboratory Learning Process: Redesigning a Teaching Unit on Recrystallization.

    Science.gov (United States)

    Mulder, T.; Verdonk, A. H.

    1984-01-01

    Reports on a project in which observations of student and teaching assistant behavior were used to redesign a teaching unit on recrystallization. Comments on the instruction manual, starting points for teaching the unit, and list of objectives with related tasks are included. (JN)

  20. Redundant filtration system of the fuel buildings,units 1 and 2 Almaraz NPP

    International Nuclear Information System (INIS)

    Lopez Tanco, J.

    2011-01-01

    The project redundant filtering fuel buildings in units 1 and 2 of Almaraz NPP, will compliance to the requirements established in the complementary technical instructions to the authorization of exploitation of Almaraz NPP, established by the CSN and will consist of the installation of a new filtration unit.