WorldWideScience

Sample records for project title program

  1. Instructional Coding System for Mathematics Program of Studies. MET, A Title IV-C Project.

    Science.gov (United States)

    Fairfax County Public Schools, VA. Dept. of Instructional Services.

    This document is part of the Management for Effective Teaching (MET) support kit, a pilot project designed by the Fairfax County (Virginia) Public Schools to assist elementary school teachers in planning, managing, and implementing the county's Program of Studies (POS). This document provides an alpha-numeric coding system to be used in…

  2. 42 CFR 137.4 - May Title V be construed to limit or reduce in any way the funding for any program, project, or...

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May Title V be construed to limit or reduce in any way the funding for any program, project, or activity serving an Indian Tribe under this or other... General Provisions § 137.4 May Title V be construed to limit or reduce in any way the funding for any...

  3. Guidance for implementing the long-term surveillance program for UMTRA Project Title I Disposal Sites

    International Nuclear Information System (INIS)

    1996-02-01

    This guidance document has two purposes: it provides guidance for writing site-specific long-term surveillance plans (LTSP) and it describes site surveillance, monitoring, and long-term care techniques for Title I disposal sites of the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.). Long-term care includes monitoring, maintenance, and emergency measures needed to protect public health and safety and the environment after remedial action is completed. This document applies to the UMTRCA-designated Title I disposal sites. The requirements for long-term care of the Title I sites and the contents of the LTSPs are provided in U.S. Nuclear Regulatory Commission (NRC) regulations (10 CFR Section 40.27) provided in Attachment 1

  4. Title VII Enhancement Project for Compartiendo Culturas/Sharing Cultures 1995-96. Research Report on Educational Programs.

    Science.gov (United States)

    Houston Independent School District, TX. Dept. of Research and Evaluation.

    Compartiendo Culturas/Sharing Cultures, a Title VII Two-Way Developmental Bilingual Education Program at the Gary L. Herod Elementary School in the Houston Independent School District (Texas) was designed to end the isolation typically experienced by language minority students in traditional bilingual education and to provide language majority…

  5. Factors Influencing Title VII Bilingual Program Institutionalization.

    Science.gov (United States)

    Lewis, Gerald R.; And Others

    1985-01-01

    This study of the primary restraining and driving forces that influence Title VII bilingual education programs found the external environment, the local community, to be the main factor influencing institutionalization and self-renewal. The internal environment--the local school, and the local school's organization or central office, school board,…

  6. Roadmap Through Title XX. Financing Services for Children Through Title XX and Other Programs: Manual 5.

    Science.gov (United States)

    Copeland, William C.; Iversen, Iver A.

    This manual, part of a Hecht Institute four-manual series entitled Financing Children's Services Through Title XX and Related Programs, teaches what Title XX regulations are, what they mean, and what actions and procedures are commanded by them. The first section covers the necessity of rule systems, the characteristics of a good rule system and…

  7. Modernizing insecurity: the land titling project in Honduras.

    NARCIS (Netherlands)

    Jansen, K.; Roquas, E.

    1998-01-01

    The Honduran land titling project (the Proyecto de Titulación de Tierra para los Pequeños Productores), initiated in 1982, was intended to enhance security in land rights, to facilitate credit and to improve agricultural productivity. This study explores how the project has operated in one village,

  8. Comprehensive Social Service Programs for Handicapped Citizens through Title XX.

    Science.gov (United States)

    Roten, Shelby Jean

    Reviewed are present and potential services and social programs for handicapped children in Mississippi through purchase of service contracts under Title XX of the Social Security Act. Sections cover the following topics: background and purpose of Title XX which gives states greater control over social service programs, planning state supported…

  9. Alternative Teacher Preparation Programs. Title II News You Can Use

    Science.gov (United States)

    Office of Postsecondary Education, US Department of Education, 2015

    2015-01-01

    Title II of the "Higher Education Act of 1965" ("HEA"), as amended in 2008 by the "Higher Education Opportunity Act," requires states to report annually on key elements of their teacher preparation programs and requirements for initial teacher credentialing, kindergarten through 12th grade. "Title II News You Can…

  10. Title IV Quality Control Project, Stage II. Management Option II: Delivery System Quality Improvements.

    Science.gov (United States)

    Advanced Technology, Inc., Reston, VA.

    Stage Two of the Title IV Quality Control Project is an integrated study of quality in five related Federal financial aid programs for postsecondary students. Section 1 of the paper establishes a framework for defining quality improvements, in order to identify the types of changes that would tend to improve quality across all facets of the…

  11. A Comprehensive Child Development Program; Title XX, Final Report.

    Science.gov (United States)

    Whatley, Juanita T.

    This booklet describes the Comprehensive Child Day Care Program for the Atlanta Public School System, a Title XX Program. This program provided day care services for children of clients in various categories. The program goals for 1975-76 were geared toward providing comprehensive day care to encompass social services to the family and…

  12. Final report for the National Center for Intermodal Transportation for Economic Competitiveness : project title: student technology exchange program (STEP) for engineering/robotics in middle school students.

    Science.gov (United States)

    2015-05-05

    Key outcomes or other achievements - This project highlighted the importance of math and science concepts within three of the six STEM-related career clusters as defined by the Mississippi Department of Education: Agriculture, Food and Natural Resour...

  13. Louisiana SIP: LAC 33:III Ch. 14 Subchap B, 1431 to 1434--Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and Projects Developed, Funded, or Approved Under Title 23 U.S.C. or the Federal Transit Laws

    Science.gov (United States)

    Louisiana SIP: LAC 33:III Ch. 14 Subchap B, 1431 to 1434--Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and Projects Developed, Funded, or Approved Under Title 23 U.S.C. or the Federal Transit Laws

  14. Final Report to DOE EERE – Geothermal Technologies Program Project Title: Monitoring and modeling of fluid flow in a developing enhanced geothermal system (EGS) reservoir

    Energy Technology Data Exchange (ETDEWEB)

    Fehler, Michael [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States)

    2017-04-19

    The primary objective of this project was to improve our ability to predict performance of an Enhanced Geothermal System (EGS) reservoir over time by relating, in a quantitative manner, microseismic imaging with fluid and temperature changes within the reservoir. Historically, microseismic data have been used qualitatively to place bounds on the growth of EGS reservoirs created by large hydraulic fracturing experiments. Previous investigators used an experimentally based fracture opening relationship (fracture aperture as a function of pressure), the spatial extent of microseismic events, and some assumptions about fracture frequency to determine the size of an EGS reservoir created during large pumping tests. We addressed a number of issues (1) locating microearthquakes that occur during hydraulic fracturing, (2) obtaining more information about a reservoir than the microearthquake locations from the microearthquake data, for example, information about the seismic velocity structure of the reservoir or the scattering of seismic waves within the reservoir, (3) developing an improved methodology for estimating properties of fractures that intersect wellbores in a reservoir, and (4) developing a conceptual model for explaining the downward growth of observed seismicity that accompanies some hydraulic injections into geothermal reservoirs. We used two primary microseismic datasets for our work. The work was motivated by a dataset from the Salak Geothermal Field in Indonesia where seismicity accompanying a hydraulic injection was observed to migrate downward. We also used data from the Soultz EGS site in France. We also used Vertical Seismic Profiling data from a well in the United States. The work conducted is of benefit for characterizing reservoirs that are created by hydraulic fracturing for both EGS and for petroleum recovery.

  15. Title IV Indian Education Program Evaluation, 1985-86.

    Science.gov (United States)

    Albuquerque Public Schools, NM. Planning, Research and Accountability.

    Public schools in Albuquerque, New Mexico, used a Title IV Part A grant to assist American Indian elementary and secondary school students in receiving passing grades and improving school-related behaviors. Canoncito Navajo Reservation, the Isleta Pueblo, and urban Indian students in Albuquerque participated in the program. Personnel consisted of…

  16. Exploratory Shaft, Phase 1, Project B-314: Title 1 design report system design description

    International Nuclear Information System (INIS)

    Hanlen, D.F.

    1983-01-01

    The report describes the project and the project systems, the principal design bases, and principal hazards and project interfaces. This report also contains the Title 1 Estimate Summary. 5 figs., 8 tabs

  17. Mini Project Programming Exams

    DEFF Research Database (Denmark)

    Nørmark, Kurt; Thomsen, Lone Leth; Torp, Kristian

    2008-01-01

    A number of different types of final programming exams used or considered at the Department of Computer Science, Aalborg University, are identified and analyzed. Based on this analysis, a new type of programming exam is introduced called a Mini Project Programming (MIP) exam. MIP is a group...... years. The MIP exam is a compromise between (1) a long problem-based project exam and (2) a short oral or written programming exam. It is concluded that the strengths of MIP are the high degree of realism in the exam assignment and comprehensiveness relative to the course syllabus. The main challenge...

  18. Project Termination Report. Title IV-C Classroom Management Project. ESEA Title IV-C, August 29, 1981 - September 30, 1982.

    Science.gov (United States)

    Halasa, Ofelia; Theus, Frank

    This report provides a summary description of the Title IV-C Classroom Management Project conducted in the Cleveland (Ohio) Public Schools. The purpose of this project was to develop and pilot test a resource handbook designed to improve elementary and secondary school teachers' ability to organize and manage their classrooms. The development of…

  19. Monitoring Completed Navigation Projects Program

    National Research Council Canada - National Science Library

    Bottin, Jr., Robert R

    2001-01-01

    ... (MCNP) Program. The program was formerly known as the Monitoring Completed Coastal Projects Program, but was modified in the late 1990s to include all navigation projects, inland as well as coastal...

  20. Youth Education - Programs / Projects

    OpenAIRE

    2004-01-01

    Christine Bozak: 4-H Steers that Work. Rebecca Brooks: Relationship Skills Education. Travis Burke: Defining Competency in the 4-H Professional’s Job. Holly L. Hays Butler: 4-H at the Indiana School for the Deaf . Kevin D. Chilek: Quality Assurance Program for Youth Livestock Exhibitors. Graham Cochran: Lessons from an Innovative Urban Youth Education Center. Steve Cramer: Use Activities Fun and Humor to Teach Character Education. Annette Devitt: Life on the Farm Project. Janet Edwards: Emot...

  1. Sarah J. Hale High School Project SABER. ESEA Title VII. Final Evaluation Report, 1979-80.

    Science.gov (United States)

    New York City Board of Education, Brooklyn, NY. Office of Educational Evaluation.

    This is an evaluation of a Title VII Bilingual Program conducted at a New York City High School in 1979-80. The report contains information on the program goals and objectives, the school site, and the student characteristics. Aspects of the instructional component discussed include programming, mainstreaming, and program funding.…

  2. Yucca Mountain Project: ESF Title I design control process review report

    International Nuclear Information System (INIS)

    1989-01-01

    The Exploratory Shaft Facility (ESF) Title 1 Design Control Process Review was initiated in response to direction from the Office of Civilian Radioactive Waste Management (OCRWM) (letter: Kale to Gertz, NRC Concerns on Title 1 Design Control Process, November 17, 1988). The direction was to identify the existing documentation that described ''hor-ellipsis the design control process and the quality assurance that governed hor-ellipsis'' (a) the development of the requirements documents for the ESF design, (b) the various interfaces between activities, (c) analyses and definitions leading to additional requirements in the System Design Requirements Documents and, (d) completion of Title 1 Design. This report provides historical information for general use in determining the extent of the quality assurance program in existence during the ESF Title 1 Design

  3. 75 FR 60407 - Gulf of the Farallones National Marine Sanctuary Permit Application Project Titled: Fine Scale...

    Science.gov (United States)

    2010-09-30

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Gulf of the Farallones National Marine Sanctuary Permit Application Project Titled: Fine Scale, Long-Term Tracking of Adult White Sharks AGENCY: Office of National Marine Sanctuaries (ONMS), National Ocean Service (NOS), National...

  4. [Educational Facilities for Pregnant School-Age Girls in Districts 3, 4, 12, 13, and 18. Project No. 1369. Evaluation of ESEA Title I Projects in New York City 1968-69.

    Science.gov (United States)

    Appel, Yetta; Berken, Ruth R.

    This project for pregnant school age girls is an ESEA Title I program operating in five facilities in Manhattan, Bronx, and Brooklyn. The primary objective of the project was to assist pregnant school age girls complete their education by being able to attend school. Additional objectives included provision of information and training in personal…

  5. Dos Idiomas, Un Mundo. Dual Language Project. Title VII Biennial Evaluation Report, 1995-97.

    Science.gov (United States)

    Ernest, Harishini M.; Gonzalez, Rosa M.

    This is an evaluation of the first 2 years of a 5-year comprehensive Bilingual Education grant funded by Title VII Part A of the Improving America's Schools Act of 1994 in the Austin Independent School District (AISD) (Texas). The grant awarded to the AISD funds a program of Developmental Bilingual Education at two elementary schools where more…

  6. An Application of the PMI Model at the Project Level Evaluation of ESEA Title IV-C Projects.

    Science.gov (United States)

    McBeath, Marcia

    All of the papers presented as part of a symposium concerned the application of the Planning, Monitoring, and Implementation Model (PMI) to the evaluation of the District of Columbia Public Schools' programs supported by the Elementary Secondary Education Act (ESEA) Title IV-C. PMI was developed to provide a model for systematic evaluation of…

  7. 3rd year final contractor report for: U.S. Department of Energy Stewardship Science Academic Alliances Program Project Title: Detailed Measurements of Rayleigh-Taylor Mixing at Large and Small Atwood Numbers

    International Nuclear Information System (INIS)

    Malcolm J. Andrews

    2006-01-01

    This project had two major tasks: Task 1. The construction of a new air/helium facility to collect detailed measurements of Rayleigh-Taylor (RT) mixing at high Atwood number, and the distribution of these data to LLNL, LANL, and Alliance members for code validation and design purposes. Task 2. The collection of initial condition data from the new Air/Helium facility, for use with validation of RT simulation codes at LLNL and LANL. This report describes work done in the last twelve (12) months of the project, and also contains a summary of the complete work done over the three (3) life of the project. As of April 1, 2006, the air/helium facility (Task 1) is now complete and extensive testing and validation of diagnostics has been performed. Initial condition studies (Task 2) is also complete. Detailed experiments with air/helium with Atwood numbers up to 0.1 have been completed, and Atwood numbers of 0.25. Within the last three (3) months we have been able to successfully run the facility at Atwood numbers of 0.5. The progress matches the project plan, as does the budget. We have finished the initial condition studies using the water channel, and this work has been accepted for publication on the Journal of Fluid Mechanics (the top fluid mechanics journal). Mr. Nick Mueschke and Mr. Wayne Kraft are continuing with their studies to obtain PhDs in the same field, and will also continue their collaboration visits to LANL and LLNL. Over its three (3) year life the project has supported two(2) Ph.D.'s and three (3) MS's, and produced nine (9) international journal publications, twenty four (24) conference publications, and numerous other reports. The highlight of the project has been our close collaboration with LLNL (Dr. Oleg Schilling) and LANL (Drs. Dimonte, Ristorcelli, Gore, and Harlow)

  8. A Second Year Evaluation of the ESEA Title III Urban Leadership Program.

    Science.gov (United States)

    Frerichs, Allen H.

    The Urban Leadership Program, funded under Title III of the Elementary and Secondary Education Act, was carried out among sixth graders at the Albert Einstein School in Chicago, Illinois. The primary purpose of the program was to develop skills and competence to prepare participants for survival and success in a large urban environment. A…

  9. What’s New? Deploying a Library New Titles Page with Minimal Programming

    Directory of Open Access Journals (Sweden)

    John Meyerhofer

    2017-01-01

    Full Text Available With a new titles web page, a library has a place to show faculty, students, and staff the items they are purchasing for their community. However, many times heavy programing knowledge and/or a LAMP stack (Linux, Apache, MySQL, PHP or APIs separate a library’s data from making a new titles web page a reality. Without IT staff, a new titles page can become nearly impossible or not worth the effort. Here we will demonstrate how a small liberal arts college took its acquisition data and combined it with a Google Sheet, HTML, and a little JavaScript to create a new titles web page that was dynamic and engaging to its users.

  10. The Effectiveness of Title I Schoolwide Projects: A Synthesis of Findings from the First Years of Evaluation.

    Science.gov (United States)

    Wong, Kenneth K.; Meyer, Stephen J.

    The 1988 Hawkins-Stafford Elementary and Secondary School Improvement Amendments to Chapter 1 (now Title I) have enabled broad expansion of Title I schoolwide projects. The regulatory changes provide funding to entire schools, rather than targeting services to meet the needs of the most disadvantaged subpopulations. This paper reviews what is…

  11. 75 FR 37456 - Green Retrofit Program of Title XII of the American Recovery and Reinvestment Act of 2009

    Science.gov (United States)

    2010-06-29

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5376-N-55] Green Retrofit Program of... Affordable Housing Preservation must collect certain data to administer the Green Retrofit Program (GRP... Title of Proposal: Green Retrofit Program of Title XII of the American Recovery and Reinvestment Act of...

  12. Mathematical programming and financial objectives for scheduling projects

    CERN Document Server

    Kimms, Alf

    2001-01-01

    Mathematical Programming and Financial Objectives for Scheduling Projects focuses on decision problems where the performance is measured in terms of money. As the title suggests, special attention is paid to financial objectives and the relationship of financial objectives to project schedules and scheduling. In addition, how schedules relate to other decisions is treated in detail. The book demonstrates that scheduling must be combined with project selection and financing, and that scheduling helps to give an answer to the planning issue of the amount of resources required for a project. The author makes clear the relevance of scheduling to cutting budget costs. The book is divided into six parts. The first part gives a brief introduction to project management. Part two examines scheduling projects in order to maximize their net present value. Part three considers capital rationing. Many decisions on selecting or rejecting a project cannot be made in isolation and multiple projects must be taken fully into a...

  13. Natural Programming: Project Overview and Proposal

    National Research Council Canada - National Science Library

    Myers, Brad

    1998-01-01

    .... The Natural Programming Project is developing general principles, methods, and programming language designs that will significantly reduce the amount of learning and effort needed to write programs...

  14. A Self-Instructional Course in Student Financial Aid Administration. Module 5: Title IV Institutional and Program Eligibility. Second Edition.

    Science.gov (United States)

    Washington Consulting Group, Inc., Washington, DC.

    The fifth module in a 17-module self-instructional course on student financial aid administration teaches novice student financial aid administrators and other personnel about Title IV institutional and program eligibility. This introduction to management of federal financial aid programs authorized by the Higher Education Act Title IV, discusses…

  15. Water Resources Research Grant Program project descriptions, fiscal year 1987

    Science.gov (United States)

    ,

    1987-01-01

    This report contains information on the 34 new projects funded by the United States Geological Survey 's Water Resources Research Grant Program in fiscal year 1987 and on 3 projects completed during the year. For the new projects, the report gives the grant number, project title, performing organization, principal investigator(s), and a project description that includes: (1) identification of water related problems and problem-solution approach (2) contribution to problem solution, (3) objectives, and (4) approach. The 34 projects include 12 in the area of groundwater quality problems, 12 in the science and technology of water quality management, 1 in climate variability and the hydrologic cycle, 4 in institutional change in water resources management, and 5 in surface water management. For the three completed projects, the report furnishes the grant number; project title; performing organization; principal investor(s); starting data; data of receipt of final report; and an abstract of the final report. Each project description provides the information needed to obtain a copy of the final report. The report contains tables showing: (1) proposals received according to area of research interest, (2) grant awards and funding according to area of research interest, (3) proposals received according to type of submitting organization, and (4) awards and funding according to type of organization. (Author 's abstract)

  16. Finding Federal Money for Children's Services: Financing Services for Children through Title XX and Other Programs. Manual 1.

    Science.gov (United States)

    Copeland, William C.

    This is the first manual of a 4-part series on how to find, obtain, contract for and manage Federal money for children's services. The first manual concentrates on ways to locate funds for new and existing programs. Emphasis is on Title XX of the Social Security Act, but attention is given also to alternative sources where Title XX funds are not…

  17. Fulbright-Hays Seminars Abroad Program 1992: Morocco and Tunisia. Final Projects.

    Science.gov (United States)

    AMIDEAST, Washington, DC.

    The projects described in this document were submitted by U.S. teachers who spent time in Morocco and Tunisia as part of the 1992 Fulbright-Hays Seminars Abroad Program. The following are among the titles of the projects included: "Formal Education in Rural Morocco: Problems and Constraints" (Victoria Baker); "Continuity and Change…

  18. 20 CFR 627.220 - Coordination with programs under title IV of the Higher Education Act including the Pell grant...

    Science.gov (United States)

    2010-04-01

    ... the Higher Education Act including the Pell grant program. 627.220 Section 627.220 Employees' Benefits... of the Higher Education Act including the Pell grant program. (a) Coordination. Financial assistance programs under title IV of the Higher Education Act of 1965, as amended (HEA) (the Pell Grant program, the...

  19. Public participation in UMTRA Project program management

    International Nuclear Information System (INIS)

    Majors, M.J.; Ulland, L.M.

    1993-01-01

    Innovative techniques for overcoming barriers to public participation on the US Department of Energy's Uranium Mill Tailings Remedial Action (UMTRA) Project have led to improved communications with stakeholders at project sites and improved communications within the project. On the UMTRA Project, it's been shown that an effective public participation program is an essential element to successful project implementation

  20. Salt River Project San Tan Generating Station, Petition to Object to Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  1. 7 CFR 1210.311 - Programs and projects.

    Science.gov (United States)

    2010-01-01

    ... PROMOTION PLAN Watermelon Research and Promotion Plan Definitions § 1210.311 Programs and projects. Programs and projects mean those research, development, advertising, or promotion programs or projects...

  2. 75 FR 36426 - Legislative Changes to Nursing Student Loan Program Authorized Under Title VIII of the Public...

    Science.gov (United States)

    2010-06-25

    ... Changes to Nursing Student Loan Program Authorized Under Title VIII of the Public Health Service Act....) 111-148. Section 5202 of the ACA changes the Nursing Student Loan (NSL) program by: (1) Increasing the... degree in nursing. Below are details on how the ACA changes Sections 836(a), 836(b)(1), and 836(b)(3) of...

  3. 75 FR 36099 - Legislative Changes to Primary Care Loan Program Authorized Under Title VII of the Public Health...

    Science.gov (United States)

    2010-06-24

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Health Resources and Services Administration Legislative Changes to Primary Care Loan Program Authorized Under Title VII of the Public Health Service Act AGENCY... changes Section 723 of the Public Health Service Act (PHSA) regarding administration of the PCL program...

  4. Title I of the Higher Education Act of 1965: Evaluation of the Present Program: Recommendations for the Future.

    Science.gov (United States)

    Whipple, James B.

    In this document, which points out weaknesses in evaluation procedures and offers a new approach to the subject, it is suggested that in the area of the United States studied, the Title 1 program is drifting without direction, leadership, or system. This makes evaluation impossible. Evaluation is sometimes a description of a program and often…

  5. Technical program plan, Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    1979-12-01

    The Basalt Waste Isolation Project (BWIP) program as administered by the DOE's Richland Operations Office and Rockwell Hanford Operations is described. The objectives, scope and scientific technologies are discussed. The work breakdown structure of the project includes: project management and support, systems integration, geosciences, hydrology, engineered barriers, test facility design and construction, engineering testing, repository studies, and schedules. The budget of the program including operating and capital cost control is also included

  6. 76 FR 34953 - Funding Opportunity Title: Risk Management Education in Targeted States (Targeted States Program...

    Science.gov (United States)

    2011-06-15

    ... Availability C. Location and Target Audience D. Maximum Award E. Project Period F. Description of Agreement..., 2011. C. Location and Target Audience The RMA Regional Offices that service the Targeted States are... marketing systems to pursue new markets. D. Purpose The purpose of the Targeted States Program is to provide...

  7. 77 FR 37415 - Office of Urban Indian Health Programs; Title V HIV/AIDS Program

    Science.gov (United States)

    2012-06-21

    ... Indian health program HIV/AIDS activities is necessary to reduce the incidence of HIV/AIDS in the urban Indian communities by increasing access to HIV related services, reducing stigma, and making testing..., Substance Abuse and Mental Health Services Administration, Health Resource and Services Administration, and...

  8. Federally Funded Programs Providing Educational Experiences for Disadvantaged Children and Youth in New York State. ESEA Title I, 1973-74.

    Science.gov (United States)

    Dobris, John, Comp.; Herman, Beatrice, Comp.

    An abbreviated descriptive summary of each ESEA Title I project implemented by local education agencies in New York State using fiscal year 1974 ESEA Title I Federal funds is provided in this publication. The exceptions are in New York City, comprising the counties of Bronx, Kings, Manhattan, Queens, and Richmond. Projects for New York City are…

  9. Leadership Development Program Final Project

    Science.gov (United States)

    Parrish, Teresa C.

    2016-01-01

    TOSC is NASA's prime contractor tasked to successfully assemble, test, and launch the EM1 spacecraft. TOSC success is highly dependent on design products from the other NASA Programs manufacturing and delivering the flight hardware; Space Launch System(SLS) and Multi-Purpose Crew Vehicle(MPCV). Design products directly feed into TOSC's: Procedures, Personnel training, Hardware assembly, Software development, Integrated vehicle test and checkout, Launch. TOSC senior management recognized a significant schedule risk as these products are still being developed by the other two (2) programs; SVE and ACE positions were created.

  10. 75 FR 22400 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator...

    Science.gov (United States)

    2010-04-28

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9142-6] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator Baltimore, L.P., Baltimore City, MD AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of final action. SUMMARY: Pursuant to section 505(b)(2) of the Clean...

  11. 76 FR 53452 - Clean Air Act Operating Permit Program; Response to Petition To Reopen the 2001 Title V Permit...

    Science.gov (United States)

    2011-08-26

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9457-3 ] Clean Air Act Operating Permit Program; Response to Petition To Reopen the 2001 Title V Permit for Reliant Portland Generating Station, Upper Mount Bethel Township, Northampton County, PA AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of action...

  12. 75 FR 75463 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper...

    Science.gov (United States)

    2010-12-03

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9234-9] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper Company, Luke, MD AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of final action. SUMMARY: Pursuant to section 505(b)(2) of the Clean Air Act (CAA), the...

  13. National Ignition Facility Project Site Safety Program

    International Nuclear Information System (INIS)

    Dun, C

    2003-01-01

    This Safety Program for the National Ignition Facility (NIF) presents safety protocols and requirements that management and workers shall follow to assure a safe and healthful work environment during activities performed on the NIF Project site. The NIF Project Site Safety Program (NPSSP) requires that activities at the NIF Project site be performed in accordance with the ''LLNL ES and H Manual'' and the augmented set of controls and processes described in this NIF Project Site Safety Program. Specifically, this document: (1) Defines the fundamental NIF site safety philosophy. (2) Defines the areas covered by this safety program (see Appendix B). (3) Identifies management roles and responsibilities. (4) Defines core safety management processes. (5) Identifies NIF site-specific safety requirements. This NPSSP sets forth the responsibilities, requirements, rules, policies, and regulations for workers involved in work activities performed on the NIF Project site. Workers are required to implement measures to create a universal awareness that promotes safe practice at the work site and will achieve NIF management objectives in preventing accidents and illnesses. ES and H requirements are consistent with the ''LLNL ES and H Manual''. This NPSSP and implementing procedures (e.g., Management Walkabout, special work procedures, etc.,) are a comprehensive safety program that applies to NIF workers on the NIF Project site. The NIF Project site includes the B581/B681 site and support areas shown in Appendix B

  14. 2 CFR 376.147 - Does an exclusion from participation in Federal health care programs under Title XI of the Social...

    Science.gov (United States)

    2010-01-01

    ... Federal health care programs under Title XI of the Social Security Act affect a person's eligibility to..., Medicaid, and other Federal health care programs under Title XI of the Social Security Act, 42 U.S.C. 1320a... Federal Agency Regulations for Grants and Agreements DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  15. Corrective action program reengineering project

    International Nuclear Information System (INIS)

    Vernick, H.R.

    1996-01-01

    A series of similar refueling floor events that occurred during the early 1990s prompted Susquehanna steam electric station (SSES) management to launch a broad-based review of how the Nuclear Department conducts business. This was accomplished through the formation of several improvement initiative teams. Clearly, one of the key areas that benefited from this management initiative was the corrective action program. The corrective action improvement team was charged with taking a comprehensive look at how the Nuclear Department identified and resolved problems. The 10-member team included management and bargaining unit personnel as well as an external management consultant. This paper provides a summary of this self-assessment initiative, including a discussion of the issues identified, opportunities for improvement, and subsequent completed or planned actions

  16. Title IX Resource Guide

    Science.gov (United States)

    Office for Civil Rights, US Department of Education, 2015

    2015-01-01

    Title IX of the Education Amendments of 1972 (Title IX) prohibits discrimination based on sex in education programs and activities in federally funded schools at all levels. If any part of a school district or college receives any Federal funds for any purpose, all of the operations of the district or college are covered by Title IX. The essence…

  17. Science Scores in Title I Elementary Schools in North Georgia: A Project Study

    Science.gov (United States)

    Frias, Ramon

    The No Child Left Behind Act (NCLB)'s emphasis of reading, language arts, and mathematics (RLA&M) and its de-emphasis of science has been a source of great concern among educators. Through an objectivist and constructionist framework, this study explored the unforeseen effects of the NCLB on public science education among Title I (TI) and non-Title I (NTI) students. The research questions focused on the effects of NCLB on Criterion Referenced Competency Test (CRCT) scores in the high-stakes subjects of reading, language arts, mathematics and the low stakes subject of science among TI and NTI 3rd, 4th, and 5th grade students in a north Georgia County during the 2010/2011 school year. This study also compared instructional time TI and NTI teachers dedicated to science. A causal-comparative quantitative methodology was used to analyze Georgia's public domain CRCT scores. Three independent-samples t tests showed that TI schools exhibited significantly lower Science CRCT scores than did NTI students at all grade levels (p need students with strong science foundations. Further study is recommended to analyze the factors associated with this science gap between TI and NTI students.

  18. Collection of Baseline Studies of the Food for Peace Title II Development Food Assistance Programs

    Data.gov (United States)

    US Agency for International Development — USAID's Office of Food for Peace (FFP) awards funding to private voluntary organizations (PVOs) to design and implement multi-year Title II development food...

  19. Project SAIL: An Evaluation of a Dropout Prevention Program.

    Science.gov (United States)

    Thompson, John L.; And Others

    Project SAIL (Student Advocates Inspire Learning) is a Title IV-C Project located in Hopkins, Minnesota, designed to prevent students from dropping out of school by keeping them successfully involved in the mainstream environment. This study presents a review of other dropout prevention approaches, describes the intervention strategies involved in…

  20. The Harvard Project Physics Film Program

    Science.gov (United States)

    Bork, Alfred M.

    1970-01-01

    States the philosophy behind the Harvard Project Physics (HPP) film program. Describes the three long HPP films. Lists the 48 color film loops covering six broad topics, primarily motion and energy. The 8-mm silent loops are synchronized with the text materials. Explains some of the pedagogical possibilities of these film loops. (RR)

  1. Project Physics Programmed Instruction, Waves 2.

    Science.gov (United States)

    Harvard Univ., Cambridge, MA. Harvard Project Physics.

    This is the second of two programmed instruction booklets on the topic of waves, developed by Harvard Project Physics. It covers the relationships among the frequency, period, wavelength, and speed of a periodic wave. For the first booklet in this series, see SE 015 552. (DT)

  2. Environmental qualification program for Wolsong project

    International Nuclear Information System (INIS)

    Duggal, A.; Johal, H.; Yee, F.; Suh, S.K.

    1995-01-01

    The Wolsong EQ Program is a process that begins at the design concept stage and continues throughout the operating life of the station. As all components may not have a 30 year service life without periodic maintenance, the EQ Program becomes an important management tool for the owner of the plant. First, the environmental conditions are predicted for the postulated events. Next, suitably qualified equipment is specified and procured. Then the equipment is installed according to specific instructions. Finally, by means of ongoing maintenance and replacement of parts, the qualification of the equipment is maintained during the operating life of the plant. Proper documentation and traceability is required at all stages of the program. As defined in the Wolsong Project Environmental Qualification Design Guide a comprehensive Environmental Qualification (EQ) Program ensures that safety related equipment located in an area in which a harsh environment could occur, can function when required for the life of the station . This program was implemented at the beginning of the Wolsong project. Using this program, components/equipment are qualified prior to installation and a maintenance program is established to keep equipment 'qualified' throughout the station life

  3. Pu-238 Supply Program Project Execution Plan

    International Nuclear Information System (INIS)

    Wham, Robert M.; Martin, Sherman

    2012-01-01

    This Pu-238 Supply Program Project Execution Plan (PEP) summarizes critical information and processes necessary to manage the program. The PEP is the primary agreement regarding planning and objectives between The Department of Energy Office of Nuclear Energy (DOE NE-75), Oak Ridge National Laboratory Site Office (OSO) and the Oak Ridge National Laboratory (ORNL). The acquisition executive (AE) will approve the PEP. The PEP is a living document that will be reviewed and revised periodically until the project is complete. The purpose of the project is to reestablish the capability to produce plutonium-238 (Pu-238) domestically. This capability consists primarily of procedures, processes, and design information, not capital assets. As such, the project is not subject to the requirements of DOE O 413.3B, but it will be managed using the project management principles and best practices defined there. It is likely that some capital asset will need to be acquired to complete tasks within the project. As these are identified, project controls and related processes will be updated as necessary. Because the project at its initiation was envisioned to require significant capital assets, Critical Decision 0 (CD-0) was conducted in accordance with DOE O 413.3B, and the mission need was approved on December 9, 2003, by William Magwood IV, director of the Office of Nuclear Energy (NE), Science and Technology, DOE. No date was provided for project start-up at that time. This PEP is consistent with the strategy described in the June 2010 report to Congress, Start-up Plan for Plutonium-238 Production for Radioisotope Power Systems.

  4. Audit-Proof Contracting for Federal Money for Children's Services: Financing Services for Children through Title XX and Other Programs. Manual 3.

    Science.gov (United States)

    Copeland, William C.

    This is the third of a 3-part series on how to locate, obtain, and manage Federal money for children's services. This manual concentrates on the contracting of money for specific programs. Emphasis is on Title XX of the Social Security Act, but attention is given also to alternative sources where Title XX funds are not sufficient. Although useful…

  5. Public participation in UMTRA Project Program Management

    International Nuclear Information System (INIS)

    Majors, M.J.; Ulland, L.M.

    1993-01-01

    The U.S. Department of Energy (DOE) is cleaning up radioactive soil and ore residue from 24 inactive uranium processing sites under the Uranium Mill Tailings Remedial Action (UMTRA) Project. In early 1993, the DOE adopted new guidelines strongly encouraging public participation. This guidance commits to providing the public with opportunities to participate in the decision-making process for program planning, design, and implementation. Rooted in the conviction that an effective public participation program will enable citizens to take part in policy decisions, the full adoption of the guidance by the UMTRA project can also help DOE make better decisions, provide a means to build consensus, and assist in building credibility. This transition to open communication parallels the climate of corporate America in which increases in productivity are often the result of workers and management teaming together to solve problems. While these guidelines have been embraced by public affairs staff from headquarters to the field offices, barriers still exist that inhibit substantive public involvement. The challenge for the UMTRA project is to overcome these barriers to ensure that public participation is an integral part of the way business is conducted. This paper discusses lessons learned by the UMTRA project in its efforts to address barriers to public participation and the project's plans for full compliance with the DOE guidelines

  6. Shippingport station decommissioning project technology transfer program

    International Nuclear Information System (INIS)

    Pasquini, L.A.

    1986-01-01

    The purpose of the Shippingport Station Decommissioning Project (SSDP) is to place the Shippingport Atomic Power Station in a long-term radiologically safe condition following defueling of the reactor, to perform decommissioning in such a manner as to demonstrate to the nuclear industry the application of decommissioning procedures to a large scale nuclear power plant, and to provide useful planning data for future decommissioning projects. This paper describes the Technology Transfer Program for collecting and archiving the decommissioning data base and its availability to the nuclear industry

  7. Evaluation of Migrant Education, Numero Uno. Title 1-M Programs in the State of Oregon, September, 1971-August, 1972.

    Science.gov (United States)

    Moore, William G., Comp.

    During the fiscal year 1970-71, Oregon's Migrant Education Program coordinated the planning and administration of several district migrant programs into area projects. Objectives for these projects are to provide: (1) diagnostic and prescriptive, each-one-teach-one or tutorial educational services for all migrant students without the background…

  8. The Yucca Mountain Project Prototype Testing Program

    International Nuclear Information System (INIS)

    1989-10-01

    The Yucca Mountain Project is conducting a Prototype Testing Program to ensure that the Exploratory Shaft Facility (ESF) tests can be completed in the time available and to develop instruments, equipment, and procedures so the ESF tests can collect reliable and representative site characterization data. This report summarizes the prototype tests and their status and location and emphasizes prototype ESF and surface tests, which are required in the early stages of the ESF site characterization tests. 14 figs

  9. SALTON SEA SCIENTIFIC DRILLING PROJECT: SCIENTIFIC PROGRAM.

    Science.gov (United States)

    Sass, J.H.; Elders, W.A.

    1986-01-01

    The Salton Sea Scientific Drilling Project, was spudded on 24 October 1985, and reached a total depth of 10,564 ft. (3. 2 km) on 17 March 1986. There followed a period of logging, a flow test, and downhole scientific measurements. The scientific goals were integrated smoothly with the engineering and economic objectives of the program and the ideal of 'science driving the drill' in continental scientific drilling projects was achieved in large measure. The principal scientific goals of the project were to study the physical and chemical processes involved in an active, magmatically driven hydrothermal system. To facilitate these studies, high priority was attached to four areas of sample and data collection, namely: (1) core and cuttings, (2) formation fluids, (3) geophysical logging, and (4) downhole physical measurements, particularly temperatures and pressures.

  10. TMI-2 Vessel Investigation Project Metallurgical Program

    International Nuclear Information System (INIS)

    Diercks, D.R.; Neimark, L.A.

    1990-01-01

    The TMI-2 [Three Mile Island unit 2] Vessel Investigation Project Metallurgical Program at Argonne National Laboratory is a part of the international TMI-2 Vessel Investigation Project being conducted jointly by the U.S. Nuclear Regulatory Commission and the Organization for Economic Co-operation and Development (OECD). The overall project consists of three phases, namely (1) recovery of material samples from the lower head of the TMI-2 reactor, (2) examination and analysis of the lower head samples and the preparation and testing of archive material subjected to a similar thermal history, and (3) procurement, examination, and analysis of companion core material located adjacent to or near the lower head material. The specific objectives of the ANL Metallurgical Program, which accounts for a major portion of Phase 2, are to prepare metallographic and mechanical test specimen blanks from the TMI-2 lower head material, prepare similar test specimen blanks from suitable archive material subjected to the appropriate thermal processing, determine the mechanical properties of the lower vessel head and archive materials under the conditions of the core-melt accident, and assess the lower head integrity and margin-to-failure during the accident. The ANL work consists of three tasks: (1) archive materials program, (2) fabrication of metallurgical and mechanical test specimens from the TMI-2 pressure vessel samples, and (3) mechanical property characterization of TMI-2 lower pressure vessel head and archive material

  11. Stripa Project - Summary of defined programs

    International Nuclear Information System (INIS)

    Carlsson, L.; Olsson, T.; Pusch, R.

    1980-11-01

    An international cooperation project, the Stripa Project, in the field of nuclear waste management has been established as an autonomous OECH/NEA project. The management of the project has been entrusted to the Divsion Nuclear Fuel Safety (KBS) of the Swedish Nuclear Fuel Supply Company (SKBF). Technical input and contribution of funds are given by the following countries: Canada, Finland, Japan, Sweden, Switzerland and the United States. The report summarizes the programs for investigations funded at this stage. A number of investigations of a geophysical, geochemical and hydraulic nature will be carried out in the boreholes and the drill cores will be mapped and analysed. Another experiment is with various tracers which represent all important types of radionuclides and will be introduced in the naturally flowing water in a single fissure in granite. The experiment will show how well sorption data from the laboratory can be used to predict radionuclide migration in the field with real surfaces and waters. The third project aims at the verification of the suitability of the buffer materials at real conditions on site. Highly compacted bentonite and mixtures of bentonite and quartz sand are proposed as buffer materials in final repositories for high-level radioactive wastes. (GB)

  12. An Analysis Of The Benefits And Application Of Earned Value Management (EVM) Project Management Techniques For Dod Programs That Do Not Meet Dod Policy Thresholds

    Science.gov (United States)

    2017-12-01

    VALUE MANAGEMENT (EVM) PROJECT MANAGEMENT TECHNIQUES FOR DOD PROGRAMS THAT DO NOT MEET DOD POLICY THRESHOLDS December 2017 By: Randy Schneider...Joint applied project 4. TITLE AND SUBTITLE AN ANALYSIS OF THE BENEFITS AND APPLICATION OF EARNED VALUE MANAGEMENT (EVM) PROJECT MANAGEMENT ...performance reporting. The immediate objective of this research project was to examine the question: Can the application of EVM-Lite project management

  13. Final Report for Project titled High Thermal Conductivity Polymer Composites for Low-Cost Heat Exchangers

    Energy Technology Data Exchange (ETDEWEB)

    Thibaud-Erkey, Catherine [United Technologies reserach Center, East Hartford, CT (United States); Alahyari, Abbas [United Technologies reserach Center, East Hartford, CT (United States)

    2016-12-28

    Heat exchangers (HXs) are critical components in a wide range of heat transfer applications, from HVAC (Heating Ventilation and Cooling) to automobiles to manufacturing plants. They require materials capable of transferring heat at high rates while also minimizing thermal expansion over the usage temperature range. Conventionally, metals are used for applications where effective and efficient heat exchange is required, since many metals exhibit thermal conductivity over 100 W/m K. While metal HXs are constantly being improved, they still have some inherent drawbacks due to their metal construction, in particular corrosion. Polymeric material can offer solution to such durability issues and allow designs that cannot be afforded by metal construction either due to complexity or cost. A major drawback of polymeric material is their low thermal conductivity (0.1-0.5? W/mK) that would lead to large system size. Recent improvements in the area of filled polymers have highlighted the possibility to greatly improve the thermal conductivity of polymeric materials while retaining their inherent manufacturing advantage, and have been applied to heat sink applications. Therefore, the objective of this project was to develop a robust review of materials for the manufacturing of industrial and commercial non-metallic heat exchangers. This review consisted of material identification, literature evaluation, as well as empirical and model characterization, resulting in a database of relevant material properties and characteristics to provide guidance for future heat exchanger development.

  14. Educational Field Trips for Disadvantaged Pupils in Nonpublic Schools. Evaluation of ESEA Title I Projects in New York City, 1967-68.

    Science.gov (United States)

    Rosenthal, Harvey M.

    This Elementary and Secondary Education Act Title I project was developed in order to provide educationally enriching experiences to New York City elementary school students in disadvantaged non-public schools by means of field trips to places of civic and cultural interest. The 182 schools chosen were in designated poverty areas. Evaluation of…

  15. The Texts of the Instruments concerning the Agency's Assistance to Greece for the Continuation of a Research Reactor Project. A Second Title Transfer Agreement

    International Nuclear Information System (INIS)

    1974-01-01

    As a sequel to the assistance which the Agency has provided to the Government of Greece in connection with a research reactor project, a Second Title Transfer Agreement has been concluded between the Agency and the Governments of Greece and the United States of America

  16. Shippingport station decommissioning project ALARA Program

    Energy Technology Data Exchange (ETDEWEB)

    Crimi, F.P. [Lockheed Environmental Systems and Technology Co., Houston, TX (United States)

    1995-03-01

    Properly planned and implemented ALARA programs help to maintain nuclear worker radiation exposures {open_quotes}As Low As Reasonably Achievable.{close_quotes}. This paper describes the ALARA program developed and implemented for the decontamination and decommissioning (D&D) of the Shippingport Atomic Power Station. The elements required for a successful ALARA program are discussed along with examples of good ALARA practices. The Shippingport Atomic Power Station (SAPS) was the first commercial nuclear power plant to be built in the United States. It was located 35 miles northwest of Pittsburgh, PA on the south bank of the Ohio river. The reactor plant achieved initial criticality in December 1959. During its 25-year life, it produced 7.5 billion kilowatts of electricity. The SAPS was shut down in October 1982 and was the first large-scale U.S. nuclear power plant to be totally decommissioned and the site released for unrestricted use. The Decommission Project was estimated to take 1,007 man-rem of radiation exposure and $.98.3 million to complete. Physical decommissioning commenced in September 1985 and was completed in September 1989. The actual man-rem of exposure was 155. The project was completed 6 months ahead of schedule at a cost of $91.3 million.

  17. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Science.gov (United States)

    2010-01-01

    ... of appropriate programs, plans, or projects for advertising, sales promotion, other promotion, and... HASS AVOCADO PROMOTION, RESEARCH, AND INFORMATION Hass Avocado Promotion, Research, and Information... promotion, industry information, consumer information, and related research programs, plans, and projects...

  18. Evaluation of Nuclear Facility Decommissioning Projects program

    International Nuclear Information System (INIS)

    Baumann, B.L.

    1983-01-01

    The objective of the Evaluation of Nuclear Facility Decommissioning Projects (ENFDP) program is to provide the NRC licensing staff with data which will allow an assessment of radiation exposure during decommissioning and the implementation of ALARA techniques. The data will also provide information to determine the funding level necessary to ensure timely and safe decommissioning operations. Actual decommissioning costs, methods and radiation exposures are compared with those estimated by the Battelle-PNL and ORNL NUREGs on decommissioning. Exposure reduction techniques applied to decommissioning activities to meet ALARA objectives are described. The lessons learned concerning various decommissioning methods are evaluated

  19. N Area Final Project Program Plan

    International Nuclear Information System (INIS)

    Day, R.S.; Duncan, G.M; Trent, S.J.

    1998-07-01

    The N Area Final Project Program Plan is issued for information and use by the U.S. Department of Energy (DOE), the Environmental Restoration Contractor (ERC) for the Hanford Site, and other parties that require workscope knowledge for the deactivation of N Reactor facilities and remediation of the 100-N Area. This revision to the program plan contains the updated critical path schedule to deactivate N Reactor and its supporting facilities, cleanout of the N Reactor Fuel Storage Basin (105-N Basin), and remediate the 100-N Area. This document reflects notable changes in the deactivation plan for N Reactor, including changes in deactivation status, the N Basin cleanout task, and 100-N Area remediation

  20. Dos Idiomas, Un Mundo Dual Language Project Title VII Third-Year Evaluation Report, 1997-98. Publication Number 97.21.

    Science.gov (United States)

    Liberty, Paul; Gonzalez, Rosa Maria

    An evaluation was conducted of the third year of a 5-year comprehensive bilingual education grant funded by Title VII of the Improving America's Schools Act of 1994. The grant funds a program of developmental bilingual education at two elementary schools in the Austin Independent School District (Texas). More than 25% of the students at each…

  1. Clean Coal Technology Programs: Completed Projects (Volume 2)

    Energy Technology Data Exchange (ETDEWEB)

    Assistant Secretary for Fossil Energy

    2003-12-01

    Annual report on the Clean Coal Technology Demonstration Program (CCTDP), Power Plant Improvement Initiative (PPII), and Clean Coal Power Initiative (CCPI). The report addresses the roles of the programs, implementation, funding and costs, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results.

  2. An Application of the PMI Model at the Project Level: Evaluation of the ESEA Title IV C Fresh Start Minischool Project.

    Science.gov (United States)

    Harrison, Patricia C.

    The Planning, Monitoring, and Implementation Model (PMI) was developed to provide a model for systematic evaluation of educational programs to determine their effectiveness in achieving goals and objectives. This paper demonstrates the applicability of the PMI model at the project level. Fresh Start Minischool at Ballou High School (District of…

  3. 78 FR 34323 - Funding Opportunity Title: Risk Management Education in Targeted States (Targeted States Program)

    Science.gov (United States)

    2013-06-07

    ... electronically through rma.agrisk.umn.edu , must be received by close of business (COB) 11:59 p.m. EST. on July... strategic goals is to ensure that its customers are well-informed of risk management solutions available... Event of a Human Pandemic Outbreak (Pandemic Plan). RMA requires that project leaders submit a project...

  4. From theory to application: using performance measures for contraceptive care in the Title X family planning program.

    Science.gov (United States)

    Loyola Briceno, Ana Carolina; Kawatu, Jennifer; Saul, Katie; DeAngelis, Katie; Frederiksen, Brittni; Moskosky, Susan B; Gavin, Lorrie

    2017-09-01

    The objective was to describe a Performance Measure Learning Collaborative (PMLC) designed to help Title X family planning grantees use new clinical performance measures for contraceptive care. Twelve Title X grantee-service site teams participated in an 8-month PMLC from November 2015 to June 2016; baseline was assessed in October 2015. Each team documented their selected best practices and strategies to improve performance, and calculated the contraceptive care performance measures at baseline and for each of the subsequent 8 months. PMLC sites implemented a mix of best practices: (a) ensuring access to a broad range of methods (n=7 sites), (b) supporting women through client-centered counseling and reproductive life planning (n=8 sites), (c) developing systems for same-day provision of all methods (n=10 sites) and (d) utilizing diverse payment options to reduce cost as a barrier (n=4 sites). Ten sites (83%) observed an increase in the clinical performance measures focused on most and moderately effective methods (MME), with a median percent change of 6% for MME (from a median of 73% at baseline to 77% post-PMLC). Evidence suggests that the PMLC model is an approach that can be used to improve the quality of contraceptive care offered to clients in some settings. Further replication of the PMLC among other groups and beyond the Title X network will help strengthen the current model through lessons learned. Using the performance measures in the context of a learning collaborative may be a useful strategy for other programs (e.g., Federally Qualified Health Centers, Medicaid, private health plans) that provide contraceptive care. Expanded use of the measures may help increase access to contraceptive care to achieve national goals for family planning. Published by Elsevier Inc.

  5. Ecological projects of Semipalatinsk region rehabilitation program

    International Nuclear Information System (INIS)

    Musataev, M.Kh.

    2000-01-01

    Number of radioecological investigations of Semipalatinsk region evident, that radiatively dangerous levels of contaminations remains only on test settlements of site, on traces of explosion dose-forming clouds, and on some sections where experiments with radioactive substances were carried out. Radiological problem includes necessity of clarification of boundaries between dirty and clean lands; study of plutonium contamination hazard and radionuclides migration with underground and surface waters; conducting of monitoring of both the water quality and the agricultural foodstuff. Today in the region the problem of psychological stress of population remains. The problem is arisen because of late consequences of nuclear tests and other factors related with insufficient well-informing of population and mistrust of population to official radiation assessments in the region. To this problem is devoted six ecological projects of Semipalatinsk site rehabilitation program proposed by 53 session of United Nation Assembly for financing by international financing organizations and by countries-donors

  6. Annual Report of the Texas Child Migrant Program, ESEA Title 1, 1974-75.

    Science.gov (United States)

    Nutt, Andrew T.; And Others

    During 1974-75, 181 school districts in Texas operated programs aimed at eliminating some of the educational deprivation of 61,799 migrant children. The majority of these districts concentrated their greatest efforts in the basic subjects including reading, mathematics, and oral language. Programs were operated in grades K-12 and a special migrant…

  7. The Air Force Air Program and Information Management System (APIMS): A flexible tool for managing your Title V Operating Permits

    Energy Technology Data Exchange (ETDEWEB)

    Weston, A.A.; Gordon, S.R.

    1999-07-01

    The Air Force Command Core System (CCS) is an integrated, activity-based risk management system designed to support the information needs of Environment, Safety, and Occupational Health (ESOH) professionals. These professionals are responsible for managing a complex and often dynamic set of requirements, and therefore, have a need for an information system that can readily be customized to meet their specific needs. This dynamic environment also drives the need for flexibility in the system. The Air Program Information Management System (APIMS) is a module within CCS designed to not only manage permit compliance and emission inventories, but also support the monitoring, recordkeeping, and reporting requirements related to air quality issues. This paper will describe the underlying foundation of CCS, the information linkages within the database, and then summarize the functionality available within the APIMS module to support the Air Quality Managers' information needs, placing emphasis on the flexibility the system provides to manage Title V Operating Permits.

  8. Project SAIL: A Summer Program Brings History Alive for Students.

    Science.gov (United States)

    Hollingsworth, Patricia

    2001-01-01

    This project describes Project SAIL (Schools for Active Interdisciplinary Learning), a federally funded project providing in-depth staff development during a 3-week summer program for teachers, parents, and their gifted/talented economically disadvantaged students. The program theme, "Searching for Patterns in History," has been used with students…

  9. 75 FR 8902 - Funding Opportunity Title: Crop Insurance Education in Targeted States (Targeted States Program)

    Science.gov (United States)

    2010-02-26

    ... and Target Audience D. Maximum Award E. Project Period F. Description of Agreement Award--Awardee.... Location and Target Audience Targeted States serviced by RMA Regional Offices are listed below. Staff from... established farmers or ranchers who are converting production and marketing systems to pursue new markets. D...

  10. 77 FR 23451 - Funding Opportunity Title; Risk Management Education and Outreach Partnerships Program

    Science.gov (United States)

    2012-04-19

    ... and Form of Application Submission C. Funding Restrictions D. Limitation on Use of Project Funds for... Section VII--Agency Contact Section VIII--Additional Information A. The Restriction of the Expenditure of... Ranchers; New and Beginning Farmers; Women Producers and Ranchers; Hispanic Producers and Ranchers; African...

  11. 77 FR 21067 - Funding Opportunity Title: Risk Management Education and Outreach Partnerships Program

    Science.gov (United States)

    2012-04-09

    ..., crop insurance, marketing contracts, and other existing and emerging risk management tools.'' For the... Management or other similar topics. Legal: Legal and Succession Planning or other similar topics; Marketing... Management Education and Outreach Partnerships Program Announcement Type: Announcement of Availability of...

  12. Salt Repository Project transportation program plan

    International Nuclear Information System (INIS)

    Fisher, R.L.; Greenberg, A.H.; Anderson, T.L.; Yates, K.R.

    1987-01-01

    The Salt Repository Project (SRP) has the responsibility to develop a comprehensive transportation program plan (TrPP) that treats the transportation of workers, supplies, and high-level radioactive waste to the site and the transportation of salt, low-level, and transuranic wastes from the site. The TrPP has developed a systematic approach to transportation which is directed towards satisfying statutes, regulations, and directives and is guided by a hierarchy of specific functional requirements, strategies, plans, and reports. The TrPP identifies and develops the planning process for transportation-related studies and provides guidance to staff in performing and documenting these activities. The TrPP also includes an explanation of the responsibilities of the organizational elements involved in these transportation studies. Several of the report chapters relate to identifying routes for transporting nuclear waste to the site. These include a chapter on identifying an access corridor for a new rail route leading to the site, identifying and evaluating emergency-response preparedness capabilities along candidate routes in the state, and identifying alternative routes from the state border, ports, or in-state reactors to the site. The TrPP also includes plans for identifying salt disposal routes and a discussion of repository/transportation interface requirements. 89 refs., 6 figs

  13. Shippingport station decommissioning project technology transfer program

    International Nuclear Information System (INIS)

    McKernan, M.L.

    1989-01-01

    The US Department of Energy (DOE) Shippingport Station Decommissioning Project (SSDP) decontaminated and dismantled the world's first nuclear-fueled, commercial-size electric power plant. The SSDP programmatic goal direction for technology transfer is documentation of project management and operations experience. The objective is to provide future nuclear facility decommissioning projects with pertinent SSDP performance data for project assessment, planning, and operational implementation. This paper sets out access and availability directions for SSDP technology acquisition. Discusses are technology transfer definition; technology transfer products including topical and other project reports, professional-technical society presentations, other project liaison and media relations, visual documentation, and technology transfer data base; and retrieving SSDP information

  14. Shippingport station decommissioning project technology transfer program

    International Nuclear Information System (INIS)

    McKernan, M.L.

    1988-01-01

    US Department of Energy (DOE) Shippingport Station Decommissioning Project (SSDP) decommissioned, decontaminated, and dismantled the world's first, nuclear fueled, commercial size, electric power plant. SSDP programmatic goal direction for technology transfer is documentation of project management and operations experience. Objective is to provide future nuclear facility decommissioning projects with pertinent SSDP performance data for project assessment, planning, and operational implementation. This paper presents a working definition for technology transfer. Direction is provided for access and availability for SSDP technology acquisition

  15. Overview of Clean Air Title V Financial Management and Reporting: A Handbook for Financial Officers and Program Managers

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  16. How Title IX and Proportionality Population Concepts Have Equalized Collegiate Women's Sports Programs with Men's Sports and Allows Spillover Gains for Women in the Workplace

    Science.gov (United States)

    Compton, Nina H.; Compton, J. Douglas

    2010-01-01

    Title IX of the Education Reformation Act was passed in 1972 for the purpose of providing equality between males and females in intercollegiate sports. Since its inception the disparity between men's and women's varsity athletics programs has persisted throughout American colleges and universities. Discrimination and equal protection concerns…

  17. National Ignition Facility Title II Design Plan

    International Nuclear Information System (INIS)

    Kumpan, S

    1997-01-01

    This National Ignition Facility (NIF) Title II Design Plan defines the work to be performed by the NIF Project Team between November 1996, when the U.S. Department of Energy (DOE) reviewed Title I design and authorized the initiation of Title H design and specific long-lead procurements, and September 1998, when Title 11 design will be completed

  18. SELENIUM TREATMENT/REMOVAL ALTERNATIVES DEMONSTRATION PROJECT - MINE WASTE TECHNOLOGY PROGRAM ACTIVITY III, PROJECT 20

    Science.gov (United States)

    This document is the final report for EPA's Mine WAste Technology Program (MWTP) Activity III, Project 20--Selenium Treatment/Removal Alternatives Demonstration project. Selenium contamination originates from many sources including mining operations, mineral processing, abandoned...

  19. Academy of Program/Project & Engineering Leadership: NASA's Path to Project Management Excellence

    Data.gov (United States)

    National Aeronautics and Space Administration — NASA's Path to Project Management Excellence eBook. Leadership plays a critical role in the success of today’s programs and projects. In an increasingly global and...

  20. Natural Programming: Project Overview and Proposal

    National Research Council Canada - National Science Library

    Myers, Brad

    1998-01-01

    End-users must write programs to control many different kinds of applications. Examples include multimedia authoring, controlling robots, defining manufacturing processes, setting up simulations, programming agents, scripting, etc...

  1. 77 FR 36557 - Office of Urban Indian Health Programs Funding Opportunity: Title V HIV/AIDS Program

    Science.gov (United States)

    2012-06-19

    ... health program HIV/AIDS activities is necessary to reduce the incidence of HIV/AIDS in the urban Indian communities by increasing access to HIV related services, reducing stigma, and making testing routine. Purpose..., Substance Abuse and Mental Health Services Administration, Health Resource and Services Administration, and...

  2. Quality assurance program plan fuel supply shutdown project

    International Nuclear Information System (INIS)

    Metcalf, I.L.

    1998-01-01

    This Quality Assurance Program plan (QAPP) describes how the Fuel Supply Shutdown (FSS) project organization implements the quality assurance requirements of HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) and the B and W Hanford Company Quality Assurance Program Plan (QAPP), FSP-MP-004. The QAPP applies to facility structures, systems, and components and to activities (e.g., design, procurement, testing, operations, maintenance, etc.) that could affect structures, systems, and components. This QAPP also provides a roadmap of applicable Project Hanford Policies and Procedures (PHPP) which may be utilized by the FSS project organization to implement the requirements of this QAPP

  3. NASA Space Flight Program and Project Management Handbook

    Science.gov (United States)

    Blythe, Michael P.; Saunders, Mark P.; Pye, David B.; Voss, Linda D.; Moreland, Robert J.; Symons, Kathleen E.; Bromley, Linda K.

    2014-01-01

    This handbook is a companion to NPR 7120.5E, NASA Space Flight Program and Project Management Requirements and supports the implementation of the requirements by which NASA formulates and implements space flight programs and projects. Its focus is on what the program or project manager needs to know to accomplish the mission, but it also contains guidance that enhances the understanding of the high-level procedural requirements. (See Appendix C for NPR 7120.5E requirements with rationale.) As such, it starts with the same basic concepts but provides context, rationale, guidance, and a greater depth of detail for the fundamental principles of program and project management. This handbook also explores some of the nuances and implications of applying the procedural requirements, for example, how the Agency Baseline Commitment agreement evolves over time as a program or project moves through its life cycle.

  4. CDIO Projects in Civil Engineering Study Program at DTU

    DEFF Research Database (Denmark)

    Krogsbøll, Anette; Simonsen, Claus; Christensen, Jørgen Erik

    2011-01-01

    or a design build project on each of the first four semesters. In this paper the four projects in the civil engineering study program are described along with a brief description of the entire study program. The aim is to provide additional information and documentation to accompany an exposition where......In 2008 all Bachelor of engineering study programs at the Technical University of Denmark (DTU) have been adopted to the “Conceive – Design – Implement – Operate” approach. As part of the necessary changes it was decided that all seven study programs should have a cross disciplinary project...... students present their projects. Learning outcomes, training and assessment of personal, professional and social engineering skills are described from a project point of view. Progression of engineering skills is discussed from a study program perspective. The interrelation between the various elements...

  5. Phased project planning and development in anticipation of operational programs

    Science.gov (United States)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  6. Final Report for the project titled "Enabling Supernova Computations by Integrated Transport and Provisioning Methods Optimized for Dedicated Channels"

    Energy Technology Data Exchange (ETDEWEB)

    Malathi Veeraraghavan

    2007-10-31

    Multiplexing (WDM) networks, while examples of virtual-circuit networks are MultiProtocol Label Switched (MPLS) networks and Ethernet Virtual Local Area Network (VLAN) networks. A series of new technologies have been developed to carry Ethernet VLAN tagged frames on SONET/SDH and WDM networks, such as Generic Framing Procedure (GFP) and ITU G.709, respectively. These technologies form the basis of our solution for connection-oriented internetworking. The benefit of developing such an architecture is that it allows different providers to choose different connection-oriented networking technologies for their networks, and yet be able to allow their customers to connect to those of other providers. As Metcalfe, the inventor of Ethernet, noted, the value of a network service grows exponentially with the number of endpoints to which any single endpoint can connect. Therefore internetworking solutions are key to commercial success. The technical effectiveness of our solutions was measured with proof-of-concept prototypes and experiments. These solutions were shown to be highly effective. Economic feasibility requires business case analyses that were beyond the scope of this project. The project results are beneficial to the public as they demonstrate the viability of simultaneously supporting different types of networks and data communication services much like the variety of services available for the transportation of people and goods. For example, Fedex service offers a deadline based delivery while the USPS offers basic package delivery service. Similarly, a circuit network can offer a deadline based delivery of a data file while the IP-routed network offers only basic delivery service with no guarantees. Two project Web sites, 13 publications, 7 software programs, 21 presentations resulted from this work. This report provides the complete list of publications, software programs and presentations. As for student education and training (human resources), this DOE project, along

  7. Functional Programming in C# Classic Programming Techniques for Modern Projects

    CERN Document Server

    Sturm, Oliver

    2011-01-01

    Take advantage of the growing trend in functional programming. C# is the number-one language used by .NET developers and one of the most popular programming languages in the world. It has many built-in functional programming features, but most are complex and little understood. With the shift to functional programming increasing at a rapid pace, you need to know how to leverage your existing skills to take advantage of this trend. Functional Programming in C# leads you along a path that begins with the historic value of functional ideas. Inside, C# MVP and functional programming expert Oli

  8. Successful healthcare programs and projects: organization portfolio management essentials.

    Science.gov (United States)

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.

  9. Fisheries Restoration Grant Program Projects [ds168

    Data.gov (United States)

    California Natural Resource Agency — This shapefile (FRGP_All_020209.shp) represents the locations of all ongoing and completed salmonid restoration projects in California with existing records in the...

  10. Geothermal Reservoir Technology Research Program: Abstracts of selected research projects

    Energy Technology Data Exchange (ETDEWEB)

    Reed, M.J. (ed.)

    1993-03-01

    Research projects are described in the following areas: geothermal exploration, mapping reservoir properties and reservoir monitoring, and well testing, simulation, and predicting reservoir performance. The objectives, technical approach, and project status of each project are presented. The background, research results, and future plans for each project are discussed. The names, addresses, and telephone and telefax numbers are given for the DOE program manager and the principal investigators. (MHR)

  11. 7 CFR 1210.331 - Programs and projects.

    Science.gov (United States)

    2010-01-01

    ..., effectuation and administration of appropriate programs or projects for advertising and other sales promotion...; (d) A prohibition on advertising or other promotion programs that make any reference to private brand... PROMOTION PLAN Watermelon Research and Promotion Plan Research and Promotion § 1210.331 Programs and...

  12. 23 CFR 668.215 - Programming and project procedures.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Programming and project procedures. 668.215 Section 668.215 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS EMERGENCY RELIEF PROGRAM Procedures for Federal Agencies for Federal Roads § 668.215 Programming...

  13. Optical projects in the Clinic program at Harvey Mudd College

    Science.gov (United States)

    Yang, Q.

    2017-08-01

    Clinic program is the senior capstone program at Harvey Mudd College (HMC). Multidisciplinary and industry-sponsored projects allow a team of students to solve a real-world problem over one academic year. Over its 50 plus years, Clinic program has completed numerous optics related projects. This report gives an overview of the Clinic program, reviews recent optical projects and discusses how this program supports the learning of the HMC engineering students. A few sample optical projects with more details are presented to provide an insight of what challenges that undergraduates can overcome. Students achieve learning within the optics discipline and the related engineering disciplines. The experiences in these optical projects indicate the great potential to bringing optical hands-on projects into the undergraduate level. Because of the general engineering curriculum at HMC, these projects often work the best with a multidisciplinary nature even if the core of the project is optically focused. Students gain leadership training, oral and written communication skills and experiences in team work. Close relationship with the sponsor liaisons allows for the students to gain skills in professional conduct, management of tight schedule and a specified budget, and it well prepares the students to their engineering practice. Optical projects have their own sets of specific challenges, so it needs to be chosen properly to match the undergraduate skill sets such as those of HMC engineering students.

  14. The Caltech Concurrent Computation Program - Project description

    Science.gov (United States)

    Fox, G.; Otto, S.; Lyzenga, G.; Rogstad, D.

    1985-01-01

    The Caltech Concurrent Computation Program wwhich studies basic issues in computational science is described. The research builds on initial work where novel concurrent hardware, the necessary systems software to use it and twenty significant scientific implementations running on the initial 32, 64, and 128 node hypercube machines have been constructed. A major goal of the program will be to extend this work into new disciplines and more complex algorithms including general packages that decompose arbitrary problems in major application areas. New high-performance concurrent processors with up to 1024-nodes, over a gigabyte of memory and multigigaflop performance are being constructed. The implementations cover a wide range of problems in areas such as high energy and astrophysics, condensed matter, chemical reactions, plasma physics, applied mathematics, geophysics, simulation, CAD for VLSI, graphics and image processing. The products of the research program include the concurrent algorithms, hardware, systems software, and complete program implementations.

  15. Expansion program is a challenging project

    International Nuclear Information System (INIS)

    Walker, G.L.

    1992-01-01

    This paper reports that construction is set to begin on the $1.5 billion PGT-PG and E Pipeline Expansion Project. It will consist of 691 miles of 42-in pipeline and 110 miles of 36-in. pipeline, to be built over 2 years. The project, which will transport additional supplies of natural gas to US West Coast markets, has its US regulatory approval in hand. On Oct. 16, 1991, the Federal Energy Regulatory Commission authorized Pacific Gas Transmission Co. to construct its Pacific Northwest segment of the expansion. Pacific Gas and Electric Co. received approval to build its California segment in late 1990 from the California Public Utilities Commission

  16. Browse Title Index

    African Journals Online (AJOL)

    Items 51 - 100 of 165 ... Issue, Title. Vol 30 (2005), Digitisation projects at the University of Cape Town Libraries, Abstract. Janine Dunlop, Lesley Hart. Vol 24 (2002), DISA: an African Perspective on Digital Technology, Abstract. Michele Pickover, Dale Peters. Vol 30 (2005), Doing it right – or are we? Basic principles in the ...

  17. Measurement plan and observational construction program on drift excavation at the Horonobe Underground Research Laboratory project

    International Nuclear Information System (INIS)

    Yamasaki, Masanao; Yamaguchi, Takehiro; Funaki, Hironori; Fujikawa, Daisuke; Tsusaka, Kimikazu

    2008-09-01

    The Horonobe URL Project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formations at Horonobe, northern Hokkaido. The project consists of two major research areas, 'Geoscientific Research' and 'R and D' on Geological Disposal', and proceeds in three overlapping phases, 'Phase I: Surface-based investigation', 'Phase II: Construction' and 'Phase III: Operation', over a period of 20 years. On the Horonobe URL Project, 'Phase 1' was finished in 2005FY and construction of the underground facility was started since then. Now, 'Phase 2' (investigations during construction of the underground facilities) is on-going. On the 'Development of engineering techniques for use in the deep underground environment' in Phase 1, based on the various types of data acquired on investigations from the surface, the design of underground facility in advance was planned. At the inception of the Phase II investigations, an investigation report titled 'Measurement Plan and Observational Construction Program on Shaft Excavation at the Horonobe URL Project' (hereinafter referred to as 'Observational Construction Program') was published. The Observational Construction Program summarizes followings from the Phase I investigations: measurements for safety/reasonable construction, measurements for R and D on enhancement of shaft design/construction technology, and measurements for verification of the deep geological environment model estimated before shaft excavation, and it is on-going. This report summarizes the measurement plan during construction of drifts based on the design in advance and the observational construction program for feedback measurements data into design and construction on subsequent steps. This report also describes about design and construction management program of underground facility and R and D program on

  18. 20 CFR 404.1599 - Work incentive experiments and rehabilitation demonstration projects in the disability program.

    Science.gov (United States)

    2010-04-01

    ... the advantages and disadvantages of altering certain limitations and conditions that apply to title II... years from the start of the experiment or demonstration project). [48 FR 7575, Feb. 23, 1983, as amended...

  19. An economic analysis methodology for project evaluation and programming.

    Science.gov (United States)

    2013-08-01

    Economic analysis is a critical component of a comprehensive project or program evaluation methodology that considers all key : quantitative and qualitative impacts of highway investments. It allows highway agencies to identify, quantify, and value t...

  20. NHDOT : process for municipally managed state aid highway program projects

    Science.gov (United States)

    2006-05-23

    The design and construction of Municipally Managed State Aid Highway Program projects must comply with the requirements in this guideline in order to receive State Aid under the applicable provisions of RSA 235. Under this process, State Aid Construc...

  1. Academy of Program/Project & Engineering Leadership Annual Publications

    Data.gov (United States)

    National Aeronautics and Space Administration — Academy of Program/Project & Engineering Leadership's Annual Report highlights the Academy's efforts to serve the NASA workforce's needs in adapting to the...

  2. Geothermal Energy Research and Development Program; Project Summaries

    Energy Technology Data Exchange (ETDEWEB)

    None

    1994-03-01

    This is an internal DOE Geothermal Program document. This document contains summaries of projects related to exploration technology, reservoir technology, drilling technology, conversion technology, materials, biochemical processes, and direct heat applications. [DJE-2005

  3. Review of fusion research program: historical summary and program projections

    Energy Technology Data Exchange (ETDEWEB)

    Murphy, E.S.

    1976-09-01

    This report provides a brief review of the history and current status of fusion research in the United States. It also describes the Federally funded program aimed at the development of fusion reactors for electric power generation.

  4. The Nordic nuclear safety program 1994-1997. Project handbook

    International Nuclear Information System (INIS)

    1997-06-01

    This is a new revision of the handbook for administrators of the Nordic reactor safety program NKS. The most important administrative functions in project management are described, which should secure a uniform management approach in all the projects. The description of the organizational scheme of the NKS and distribution of responsibilities is followed by examples of various administrative routines and document forms. In the annex the names and addresses of the staff involved in administration of the NKS program are listed. (EG)

  5. 42 CFR 50.208 - Program or project requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Program or project requirements. 50.208 Section 50.208 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS POLICIES OF GENERAL APPLICABILITY Sterilization of Persons in Federally Assisted Family Planning Projects § 50.208...

  6. Railway projects prioritisation for investment : application of goal programming

    OpenAIRE

    Ahern, Aoife; Anandarajah, Gabrial

    2007-01-01

    This research develops a weighted integer goal-programming model for prioritising railway projects for investment. The goal of the model is to prioritise the identified projects for investment while maximising the objectives and meeting the budget limit for capital investment. The model minimises the goal deviations of the objectives. The objectives of the model include quantitative and qualitative attributes. The model is applied to prioritise the new railway projects, which have a total cos...

  7. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 14 of 14 ... Issue, Title. Vol 2, No 1 (2009), Auditory and Respiratory Health Disorders Among Workers in an Iron and Steel Factory, Abstract. GM Abdel – Rasoul, OAE Mahrous, ME Abou Salem, MA Al-Batanony, HK Allam. Vol 2, No 1 (2009), Effect of An Educational Program About Medical Waste Management on ...

  8. Browse Title Index

    African Journals Online (AJOL)

    Items 151 - 200 of 286 ... Issue, Title. Vol 2, No 3-4 (2008), Impact of fire wood collection on trees species diversity in Bauchi state, Nigeria, Abstract. A Nura, A Ibrahim, I Mohammed, U Haruna. Vol 5, No 3 (2011), Impact of national special program for food security in Abia State, nigeria, Abstract. CO Emerole. Vol 5, No 1 (2011) ...

  9. 1981 Magnetic-fusion theory program project summaries

    International Nuclear Information System (INIS)

    1982-02-01

    The theory program supports research projects at three different types of sites: DOE and other government laboratories, universities, and industrial contractors. This report is organized into three sections corresponding to the three types of sites and within each section is organized alphabetically by site name. Summaries of each program are given

  10. Project Selection for NASA's R&D Programs

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of NASA s Research and Development (R&D) programs is to provide advanced human support technologies for the Exploration Systems Mission Directorate (ESMD). The new technologies must be sufficiently attractive and proven to be selectable for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are likely options for flight. The R&D programs must select an array of technology development projects, manage them, and either terminate or continue them, so as to maximize the delivered number of potentially usable advanced human support technologies. This paper proposes an effective project selection methodology to help manage NASA R&D project portfolios.

  11. Compliance with the Clean Air Act Title VI Stratospheric Ozone Protection Program requirements at U.S. DOE Oak Ridge Reservation Facilities

    International Nuclear Information System (INIS)

    Humphreys, M.P.; Atkins, E.M.

    1999-01-01

    The Title VI Stratospheric Ozone Protection Program of the Clean Air Act (CAA) requires promulgation of regulations to reduce and prevent damage to the earth's protective ozone layer. Regulations pursuant to Title VI of the CAA are promulgated in the Code of Federal Regulations (CFR) at Title 40 CFR, Part 822. The regulations include ambitious production phaseout schedules for ozone depleting substances (ODS) including chlorofluorocarbons (CFCs), hydrochlorofluorocarbons (HCFCs), halons, carbon tetrachloride, and methyl chloroform under 40 CFR 82, Subpart A. The regulations also include requirements for recycling and emissions reduction during the servicing of refrigeration equipment and technician certification requirements under Subpart F; provisions for servicing of motor vehicle air conditioners under Subpart B; a ban on nonessential products containing Class 1 ODS under Subpart C; restrictions on Federal procurement of ODS under Subpart D; labeling of products using ODS under Subpart E; and the Significant New Alternatives Policy Program under Subpart G. This paper will provide details of initiatives undertaken at US Department of Energy (DOE) Oak Ridge Reservation (ORR) Facilities for implementation of requirements under the Title VI Stratospheric Ozone Protection Program. The Stratospheric Ozone Protection Plans include internal DOE requirements for: (1) maintenance of ODS inventories; (2) ODS procurement practices; (3) servicing of refrigeration and air conditioning equipment; (4) required equipment modifications or replacement; (5) technician certification training; (6) labeling of products containing ODS; (7) substitution of chlorinated solvents; and (8) replacement of halon fire protection systems. The plans also require establishment of administrative control systems which assure that compliance is achieved and maintained as the regulations continue to develop and become effective

  12. University Program Management Information System: NASA's University Program Active Projects

    Science.gov (United States)

    Gans, Gary (Technical Monitor)

    2003-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data. This report was prepared by the Office of Education/N.

  13. Assurance management program for the 30 Nova laser fusion project

    International Nuclear Information System (INIS)

    Levy, A.J.

    1983-01-01

    The Nova assurance management program was developed using the quality assurance (QA) approach first implemented at LLNL in early 1978. The LLNL QA program is described as an introduction to the Nova assurance management program. The Nova system is described pictorially through the Nova configuration, subsystems and major components, interjecting the QA techniques which are being pragmatically used to assure the successful completion of the project

  14. Project STOP (Spectral Thermal Optimization Program)

    Science.gov (United States)

    Goldhammer, L. J.; Opjorden, R. W.; Goodelle, G. S.; Powe, J. S.

    1977-01-01

    The spectral thermal optimization of solar cell configurations for various solar panel applications is considered. The method of optimization depends upon varying the solar cell configuration's optical characteristics to minimize panel temperatures, maximize power output and decrease the power delta from beginning of life to end of life. Four areas of primary investigation are: (1) testing and evaluation of ultraviolet resistant coverslide adhesives, primarily FEP as an adhesive; (2) examination of solar cell absolute spectral response and corresponding cell manufacturing processes that affect it; (3) experimental work with solar cell manufacturing processes that vary cell reflectance (solar absorptance); and (4) experimental and theoretical studies with various coverslide filter designs, mainly a red rejection filter. The Hughes' solar array prediction program has been modified to aid in evaluating the effect of each of the above four areas on the output of a solar panel in orbit.

  15. User's operating procedures. Volume 2: Scout project financial analysis program

    Science.gov (United States)

    Harris, C. G.; Haris, D. K.

    1985-01-01

    A review is presented of the user's operating procedures for the Scout Project Automatic Data system, called SPADS. SPADS is the result of the past seven years of software development on a Prime mini-computer located at the Scout Project Office, NASA Langley Research Center, Hampton, Virginia. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, two (2) of three (3), provides the instructions to operate the Scout Project Financial Analysis program in data retrieval and file maintenance via the user friendly menu drivers.

  16. User's operating procedures. Volume 1: Scout project information programs

    Science.gov (United States)

    Harris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the Scout Project Automatic Data System, called SPADS is given. SPADS is the result of the past seven years of software development on a Prime minicomputer located at the Scout Project Office. SPADS was developed as a single entry, multiple cross reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. The instructions to operate the Scout Project Information programs in data retrieval and file maintenance via the user friendly menu drivers is presented.

  17. Obtaining Federal Money for Children's Services: Financing Services for Children through Title XX and Other Programs. Manual 2.

    Science.gov (United States)

    Copeland, William C.

    This is the second manual of a 4-part series on how to find, obtain, contract for and manage Federal money for children's services. This manual discusses how to put together a services concept, how to organize to obtain federal money and how to relate to the state's or county's planning, budgeting and appropriations cycle. Emphasis is on Title XX…

  18. 77 FR 16509 - Proposed Approval of Revision of Five California Clean Air Act Title V Operating Permits Programs

    Science.gov (United States)

    2012-03-21

    ... ``greenhouse gases that are `subject to regulation' as defined in 40 CFR 70.2 in effect August 2, 2010... potential to emit (PTE)of greenhouse gas (GHG) above the thresholds in EPA's Tailoring Rule that have not... Significant Deterioration and Title V Greenhouse Gas Tailoring Rule; Final Rule,'' (the Tailoring Rule), 75 FR...

  19. National Conversion Pilot Project Waste Management Program

    International Nuclear Information System (INIS)

    Engelmann, G.G.; Simmons, M.S.

    1995-01-01

    The U.S. Department of Energy facilities are in the process of downsizing. Most plans for downsizing focus on the decontamination and decommissioning of excess production facilities. A different approach for downsizing is taken at Rocky Flats Environmental Technology Site (RFETS), which has four production buildings. These buildings were used for the production of weapons components from uranium and beryllium and contain unique and valuable equipment, such as rolling mills, furnaces, and high-capacity presses, which could be utilized for stage-III metal recycling. The mission of this National Conversion Pilot Project (NCPP) open-quotes is to explore and demonstrate, at the Rocky Flats Environmental Technology Site (RFETS), the feasibility of economic conversion at Department of Energy facilities.close quotes The NCPP has been divided into three stages: 1. Stage I-planning and feasibility determination 2. Stage II-facility cleanup for reuse and operational assessment 3. Stage III-metals recycling. The NCPP has recently been approved to begin stage II. The objective of the NCPP stage II is to prepare the four NCPP buildings for stage III, to remove unwanted equipment, and to decontaminate buildings and essential equipment to levels consistent with those that commercial industrial operations must meet pursuant to applicable Occupational Safety and Health Administration, U.S. Environmental Protection Agency, U.S. Nuclear Regulatory Commission, and state workplace regulations

  20. Project Report: Undergraduate Student Research Program (USRP)

    Science.gov (United States)

    Gavin, Patricia

    2011-01-01

    To better understand geochemical processes occurring on Europa's seafloor, we investigated the effects of varying Fe?content in the seafloor rock and varying temperature. Iron is important in such geochemical processes as the production of methane through serpentinization (e.g. Allen and Seyfried, 2003) and can be a nutrient for microbes (Russell and Hall, 2006; Park and Kim, 2001). It can also offer clues as to the state of differentiation of Europa's core/mantle. If Europa is fully differentiated and contains an iron core, we would expect there to be little iron in the mantle and ocean floor whereas a homogeneous Europa would have iron evenly dispersed throughout the ocean floor. Furthermore, the composition of the ocean is a result of water?rock interactions at the seafloor. This project investigated the effects of temperature on geochemical processes, comparing high temperature (> 250oC) hydrothermal vents (Kelley et al., 2001) to lower temperature (20oC) cold seeps (e.g. Orphan et al., 2002).

  1. 100-N pilot project: Proposed consolidated groundwater monitoring program

    International Nuclear Information System (INIS)

    Borghese, J.V.; Hartman, M.J.; Lutrell, S.P.; Perkins, C.J.; Zoric, J.P.; Tindall, S.C.

    1996-11-01

    This report presents a proposed consolidated groundwater monitoring program for the 100-N Pilot Project. This program is the result of a cooperative effort between the Hanford Site contractors who monitor the groundwater beneath the 100-N Area. The consolidation of the groundwater monitoring programs is being proposed to minimize the cost, time, and effort necessary for groundwater monitoring in the 100-N Area, and to coordinate regulatory compliance activities. The integrity of the subprograms requirements remained intact during the consolidation effort. The purpose of this report is to present the proposed consolidated groundwater monitoring program and to summarize the process by which it was determined

  2. Health physics program for the Edgemont Uranium Mill decommissioning project

    International Nuclear Information System (INIS)

    Polehn, J.L.; Wallace, R.G.; Reed, R.P.; Wilson, G.T.

    1986-01-01

    The Tennessee Valley Authority (TVA) is actively involved in decommissioning a uranium mill located near the town of Edgemont, South Dakota. The Edgemont Mill Decommissioning Project, which is unique in many respects, will involve dismantlement of the old inactive mill building and excavation and transportation of several million tons of uranium mill tailings to a permanent disposal site. To ensure that workers are adequately protected from radiation exposure during decommissioning operations, a health physics program appropriate for the decommissioning situation was developed. The Edgemont Mill Decommissioning Project Health Physics Manual (HPM) gives the programmatic requirements for worker radiation protection. The requirements of the HPM are implemented by means of detailed onsite operating procedures. The Edgemont project health physics program was developed using currently available regulations and guidance for an operating uranium mill with appropriate modifications for decommissioning. This paper discusses the development, implementation, and documentation of that program

  3. UMTRA Project Office quality assurance program plan. Revision 6

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites. The UMTRA Project's mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the UMTRA Project Office and its contractors

  4. Quality assurance program plan for cesium legacy project

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Cesium Legacy Project. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP). These activities include all aspects of cask transportation, project related operations within the 324 Building, and waste management as it relates to the specific activities of this project. General facility activities (i.e. 324 Building Operations, Central Waste Complex Operations, etc.) are covered in other appropriate QAPPs. The 324 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a B and W Hanford Company (BWHC) managed facility. During this transition process existing PNNL procedures and documents will be utilized until replaced by BWHC procedures and documents

  5. Pile Structure Program, Projected Start Date : January 1, 2010 (Implementation).

    Energy Technology Data Exchange (ETDEWEB)

    Collins, Chris; Corbett, Catherine [Lower Columbia River Estuary Partnership; Ebberts, Blaine [U.S. Army Corps of Engineers

    2009-07-27

    The 2008 Federal Columbia River Power System Biological Opinion includes Reasonable and Prudent Alternative 38-Piling and Piling Dike Removal Program. This RPA directs the Action Agencies to work with the Estuary Partnership to develop and implement a piling and pile dike removal program. The program has since evolved to include modifying pile structures to enhance their habitat value and complexity by adding large woody debris. The geographic extent of the Pile Structure Program (PSP) includes all tidally-influenced portions of the lower Columbia River below Bonneville Dam; however, it will focus on the mainstem. The overarching goal of the PSP is to enhance and restore ecosystem structure and function for the recovery of federally listed salmonids through the active management of pile structures. To attain this goal, the program team developed the following objectives: (1) Develop a plan to remove or modify pile structures that have lower value to navigation channel maintenance, and in which removal or modification will present low-risk to adjacent land use, is cost-effective, and would result in increased ecosystem function. (2) Determine program benefits for juvenile salmonids and the ecosystem through a series of intensively monitored pilot projects. (3) Incorporate best available science and pilot project results into an adaptive management framework that will guide future management by prioritizing projects with the highest benefits. The PSP's hypotheses, which form the basis of the pilot project experiments, are organized into five categories: Sediment and Habitat-forming Processes, Habitat Conditions and Food Web, Piscivorous Fish, Piscivorous Birds, and Toxic Contaminant Reduction. These hypotheses are based on the effects listed in the Estuary Module (NOAA Fisheries in press) and others that emerged during literature reviews, discussions with scientists, and field visits. Using pilot project findings, future implementation will be adaptively managed

  6. Uranium Mill Tailings Remedial Action Project Vicinity Property Program

    International Nuclear Information System (INIS)

    Little, L.E.; Potter, R.F.; Arpke, P.W.

    1988-01-01

    The Department of Energy Uranium Mill Tailings Remedial Action (UMTRA) Grand Junction Project Vicinity Property Program is a $165 million program for the removal and disposal of uranium mill tailings that were used in the construction of approximately 4,000 residences, commercial buildings, and institutional facilities in the City of Grand Junction and surrounding Mesa County, Colorado. This paper discusses the UMTRA Vicinity Property Program and the economic benefits of this program for the City of Grand Junction and Mesa County, Colorado. The Bureau of Reclamation Economic Assessment Model (BREAM) was used to estimate the increases in employment and increases in personal income in Mesa County that result from the Vicinity Property Program. The effects of program-related changes in income and taxable expenditures on local and state tax revenue are also presented

  7. ERD UMTRA Project quality assurance program plan, Revision 7

    International Nuclear Information System (INIS)

    1995-09-01

    This document is the revised Quality Assurance Program Plan (QAPP) dated September, 1995 for the Environmental Restoration Division (ERD) Uranium Mill Tailings Remedial Action Project (UMTRA). Quality Assurance requirements for the ERD UMTRA Project are based on the criteria outlined in DOE Order 5700.6C or applicable sections of 10 CFR 830.120. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the ERD UMTRA Project and its contractors

  8. User's operating procedures. Volume 3: Projects directorate information programs

    Science.gov (United States)

    Haris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the scout project automatic data system, called SPADS is presented. SPADS is the results of the past seven years of software development on a prime mini-computer. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, three of three, provides the instructions to operate the projects directorate information programs in data retrieval and file maintenance via the user friendly menu drivers.

  9. Staff training program of CANDU projects in Saskatoon

    International Nuclear Information System (INIS)

    Huterer, J.

    1996-01-01

    This paper describes the training process for a nuclear project on a new site. When AECL opened a project office Saskatoon, senior management recognized the need for large scale staff training and made the necessary commitments. Two types of training programs were initiated, general and technical. The general training plan included topics related to nuclear project life cycle. Technical training was discipline and task specific. Based on the job descriptions and staff qualifications, technical training requirements were documented for the entire staff. The training strategy was developed and implemented. Detailed records were maintained to monitor the progress, draw conclusions, and plan training for future nuclear facilities. (author)

  10. Title VI in '76: Review of Projects Funded Under P.L. 91-230 Title VI-B, Education of the Handicapped Act, as Amended by P.L. 93-380 and P.L. 94-142. Fiscal Year 1976.

    Science.gov (United States)

    Florida State Dept. of Education, Tallahassee.

    Summarized are 89 projects which served exceptional students in all 67 Florida school districts and were funded during the 1975-76 school year under P.L. 91-230 Title VI B (Education of the Handicapped Act) as ammended by P.L. 93-380 and P.L. 94-142. Projects are divided into the following major areas; Florida Learning Resources System,…

  11. Quality assurance program plan for SNF characterization support project

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Spent Nuclear Fuel Characterization Support Project. This QAPP has been developed specifically for the Spent Nuclear Fuel Characterization Support Project, per Letter of Instruction (LOI) from Duke Engineering and Services Company, letter No. DESH-9655870, dated Nov. 22, 1996. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP) and LOI. These activities include installation of sectioning equipment and furnace, surface and subsurface examinations, sectioning for metallography, and element drying and conditioning testing, as well as project related operations within the 327 facility as it relates to the specific activities of this project. General facility activities are covered in other appropriate QA-PPS. In addition, this QAPP supports the related quality assurance activities addressed in CM-2-14, Hazardous Material Packaging and Shipping,1261 and HSRCM-1, Hanford Site Radiological Control Manual. The 327 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a Babcock and Wilcox Hanford Company (BVMC) managed facility. During this transition process existing procedures and documents will be utilized until replaced by BVMC procedures and documents. These documents conform to the requirements found in PNL-MA-70, Quality Assurance Manual and PNL-MA-8 1, Hazardous Materials Shipping Manual. The Quality Assurance Program Index (QAPI) contained in Table 1 provides a matrix which shows how project activities relate to IO CFR 830.120 and 5700.6C criteria. Quality Assurance program requirements will be addressed separate from the requirements specified in this document. Other Hanford Site organizations/companies may be utilized in support of this project and the subject organizations are

  12. Integrated Risk Management Within NASA Programs/Projects

    Science.gov (United States)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  13. MEET : project action plan for AUMA energy management program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-11-22

    The Municipal Energy Efficiency Trust (MEET) action plan offers a framework to help municipalities in Alberta demonstrate leadership in reducing energy consumption. It sets out targets for energy reductions and the associated capital investment. As more information is compiled from energy audits, the targets will be refined. AUMA and Enmax Energy Corp have partnered to provide energy audits designed to allow all municipalities to undertake energy savings projects. The program is divided into 8 basic categories for energy savings projects including: water and sewage collection, treatment and distribution; recreation centres such as pools and skating rinks; streetlights; office buildings; garages, shops and parking lots; other and innovative projects; municipal audit evaluation support; and, direct grants applied to each project. The estimates for energy savings within each category are provided. The maximum allowable payback period for the project is assumed to be 15 years. Total municipal energy use in Alberta is estimated at 1,100,000 MWh per year. A province wide program will enable AUMA to provide centralized services such as project management and procurement services to address municipal resource constraints and provide some economies of scale for smaller municipalities. AUMA will act as the fund administrator and will set criteria for acceptable projects. The action plan focuses on the energy audit program, municipal facility data collection, municipal staff education, and the establishment of a funding pool. The target for 2002/2003 will be to identify projects with energy savings of at least 15,000 MWh for water treatment and distribution recreation centres for a total capital cost of $13,500,000. 1 tab., 3 figs.

  14. Multidisciplinary projects at the Eindhoven/Maastricht BME program

    NARCIS (Netherlands)

    Sauren, A.A.H.J.; Lammerts, I.M.M.; Clark, J.W.

    2002-01-01

    Integration and application of technical and (bio)medical knowledge in the complex area of biomedical engineering is a matter of teamwork. In our educational BME program special attention is focussed on this issue, by means of multidisciplinary projects (MDP's) for 3rd and 4th year students. The

  15. Project Healthy Bones: An Osteoporosis Prevention Program for Older Adults.

    Science.gov (United States)

    Klotzbach-Shimomura, Kathleen

    2001-01-01

    Project Healthy Bones is a 24-week exercise and education program for older women and men at risk for or who have osteoporosis. The exercise component is designed to improve strength, balance, and flexibility. The education curriculum stresses the importance of exercise, nutrition, safety, drug therapy, and lifestyle factors. (SK)

  16. Project Icarus: Stakeholder Scenarios for an Interstellar Exploration Program

    Science.gov (United States)

    Hein, A. M.; Tziolas, A. C.; Osborne, R.

    The Project Icarus Study Group's objective is to design a mainly fusion-propelled interstellar probe. The starting point are the results of the Daedalus study, which was conducted by the British Interplanetary Society during the 1970's. As the Daedalus study already indicated, interstellar probes will be the result of a large scale, decade-long development program. To sustain a program over such long periods, the commitment of key stakeholders is vital. Although previous publications identified political and societal preconditions to an interstellar exploration program, there is a lack of more specific scientific and political stakeholder scenarios. This paper develops stakeholder scenarios which allow for a more detailed sustainability assessment of future programs. For this purpose, key stakeholder groups and their needs are identified and scientific and political scenarios derived. Political scenarios are based on patterns of past space programs but unprecedented scenarios are considered as well. Although it is very difficult to sustain an interstellar exploration program, there are scenarios in which this seems to be possible, e.g. the discovery of life within the solar system and on an exoplanet, a global technology development program, and dual-use of technologies for defence and security purposes. This is a submission of the Project Icarus Study Group.

  17. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    International Nuclear Information System (INIS)

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level

  18. 24 CFR 200.61 - Title.

    Science.gov (United States)

    2010-04-01

    ... Commissioner. (c) Endorsement of the credit instrument for insurance shall evidence the acceptability of title... GENERAL INTRODUCTION TO FHA PROGRAMS Requirements for Application, Commitment, and Endorsement Generally...

  19. Superfund TIO videos. Set A. Regulatory overview - CERCLA's relationship to other programs: RCRA, Title III, UST, CWA, SDWA. Part 1. Audio-Visual

    International Nuclear Information System (INIS)

    1990-01-01

    The videotape is divided into five sections. Section 1 provides definitions and historical information on both the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The four types of RCRA regulatory programs - Subtitles C, D, I, and J - are described. Treatment, storage, and disposal (TSD) and recycling facilities are also discussed. Section 2 discusses the history behind the Emergency Planning and Community Right-to-Know Act (Title III). The four major provisions of Title III, which are emergency planning, emergency release notification, community right-to-know reporting, and the toxic chemical release inventory are covered. Section 3 outlines the UST program covering notification, record keeping, and the UST Trust Fund. Section 4 outlines the six major provisions of the Clean Water Act (CWA): water quality, pretreatment, prevention of oil and hazardous substance discharges, responses to oil and hazardous substance discharges, discharges of hazardous substances into the ocean, and dredge and fill. Section 5 explains the purpose, regulations, and standards of the Safe Drinking Water Act (SDWA). Specific issues such as underground injection, sole source aquifers, and lead contamination are discussed

  20. A Program on Biochemical and Biomedical Engineering.

    Science.gov (United States)

    San, Ka-Yiu; McIntire, Larry V.

    1989-01-01

    Presents an introduction to the Biochemical and Biomedical Engineering program at Rice University. Describes the development of the academic and enhancement programs, including organizational structure and research project titles. (YP)

  1. The adolescent family life program: a multisite evaluation of federally funded projects serving pregnant and parenting adolescents.

    Science.gov (United States)

    Kan, Marni L; Ashley, Olivia Silber; LeTourneau, Kathryn L; Williams, Julia Cassie; Jones, Sarah B; Hampton, Joel; Scott, Alicia Richmond

    2012-10-01

    We evaluated the effectiveness of care demonstration projects supported by the Title XX Adolescent Family Life (AFL) program, which serves pregnant and parenting adolescents in an effort to mitigate the risks associated with adolescent childbearing. This cross-site evaluation involved 12 projects and 1038 adolescents who received either enhanced services funded by the AFL program or usual care. We examined the effects of enhanced services on health, educational, and child care outcomes approximately 6 months to 2 years after intake and explored moderation of program effects by time since intake and project characteristics associated with outcomes. The odds of using long-acting reversible contraception (odds ratio [OR] = 1.58) and receiving regular child care (OR = 1.50) in the past month were higher in the intervention group than in the comparison group. Odds of a repeat pregnancy were lower (OR = 0.39) among intervention group adolescents than among comparison group adolescents within 12 months of intake. Several project characteristics were associated with adolescent health outcomes. These projects show promise in improving effective contraceptive use, increasing routine child care, and yielding short-term decreases in repeat pregnancy.

  2. --No Title--

    Science.gov (United States)

    Management. Select from the links to the left for resources available. Handbook of Hydrologic Products Daily Search Search Home SH Reference Manual E19 Documentation Program Management Training/Drills Other River and Lake Summary (RVD) SH Reference Manual, E-19 Docs, Program Management, Training/Drills, Other

  3. Materials Development Program: Ceramic Technology Project bibliography, 1984--1992

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    The Ceramic Technology [for Advanced Heat Engines] Project was begun in 1983 to meet the ceramic materials needs of the companion DOE automotive engine program, the Advanced Gas Turbine (AGT) project, and the Heavy Duty Transport (low-heat-rejection, heavy-duty diesel) project. Goal is to develop an industry technology base for reliable and cost effective ceramics for applications in advanced automotive gas turbine and diesel engines. Research areas were identified following extensive input from industry and academia. Majority of research is done by industry (60%); work is also done at colleges and universities, in-house, and at other national laboratories and government agencies. In the beginning, reliability of ceramic components was the key issue. The reliability issues have largely been met and, at the present time, cost is the driving issue, especially in light of the highly cost-sensitive automotive market. Emphasis of the program has now been shifted toward developing cost-effective ceramic components for high-performance engines in the near-term. This bibliography is a compilation of publications done in conjunction with the Ceramic Technology Project since its beginning. Citations were obtained from reports done by participants in the project. We have tried to limit citations to those published and easily located. The end date of 1992 was selected.

  4. New York State Title III NDEA Planning Guide. Revised Edition, 1967-68.

    Science.gov (United States)

    New York State Education Dept., Albany.

    This document provides guidelines for public school authorities who wish to avail themselves of the opportunities provided by the Title III NDEA programs. The document outlines participation in the program in terms of--(1) application procedures, (2) reimbursement procedures, (3) special projects, (4) priority considerations, (5) basic standards…

  5. Hanford Waste Vitrification Plant Project Waste Form Qualification Program Plan

    International Nuclear Information System (INIS)

    Randklev, E.H.

    1993-06-01

    The US Department of Energy has created a waste acceptance process to help guide the overall program for the disposal of high-level nuclear waste in a federal repository. This Waste Form Qualification Program Plan describes the hierarchy of strategies used by the Hanford Waste Vitrification Plant Project to satisfy the waste form qualification obligations of that waste acceptance process. A description of the functional relationship of the participants contributing to completing this objective is provided. The major activities, products, providers, and associated scheduling for implementing the strategies also are presented

  6. 75 FR 7610 - Office of Urban Indian Health Programs; Title V HIV/AIDS Competing Continuation Grants

    Science.gov (United States)

    2010-02-22

    ... number of American Indian/Alaska Natives (AI/AN) with awareness of his/her HIV status. This will provide... address HIV/AIDS prevention in AI/ AN populations in the United States. The nature of these projects will... project. All future awards under this announcement are subject to the availability of funds. Hence, the...

  7. Science and students: Yucca Mountain project's education outreach program

    International Nuclear Information System (INIS)

    Gil, A.V.; Larkin, E.L.; Reilly, B.; Austin, P.

    1992-01-01

    The U.S. Department of Energy (DOE) is very concerned about the lack of understanding of basic science. Increasingly, critical decisions regarding the use of energy, technology, and the environment are being made. A well-educated and science-literate public is vital to the success of these decisions. Science education and school instruction are integral parts of the DOE's public outreach program on the Yucca Mountain Site Characterization Project (YMP). Project staff and scientists speak to elementary, junior high, high school, and university students, accepting all speaking invitations. The objectives of this outreach program include the following: (1) educating Nevada students about the concept of a high-level nuclear waste repository; (2) increasing awareness of energy and environmental issues; (3) helping students understand basic concepts of earth science and geology in relation to siting a potential repository; and (4) giving students information about careers in science and engineering

  8. No title

    CERN Multimedia

    Dezsõ, Horváth

    2008-01-01

    Even if black holes are indeed produced at the world's largest particle accelerator constructed at CERN, they will not present any danger - explained Dezso Horvath, professor of physics and leader of the Hungarian contingent engaged in several CERN projects, when he was questioned in the VIP-hall about the Large Hadron Collider (LHC) soon to enter into action.

  9. Formation of the portfolio of projects for informatization programs

    Directory of Open Access Journals (Sweden)

    Ion Bolun

    2009-12-01

    Full Text Available in informatization programs are approached: criteria of efficiency, general problem, aggregate problem in continuous form, general problem in discrete form and solving of problems. As criterion of informatization projects' economic efficiency, the total profit maximization due to investments is used. In preliminary calculations, the opportunity of considering continuous dependences of profit on the volume of investments by domain activities is grounded. Eleven classes of such dependences are investigated and analytical solutions and algorithms for solving formulated problems are described.

  10. TMI-2 Vessel Investigation Project (VIP) Metallurgical Program

    International Nuclear Information System (INIS)

    Diercks, D.R.; Neimark, L.A.

    1990-06-01

    The TMI-2 Vessel Investigation Project (VIP) Metallurgical Program is a part of the international TMI-2 Vessel Investigation Project being conducting jointly by the US Nuclear Regulatory Commission and the Organization for Economic Co-operation and Development (OECD). The overall project consists of three phases, namely (1) recovery of material samples from the lower head of the TMI-2 reactor, (2) examination and analysis of the lower head samples and the preparation and testing of archive material subjected to a similar thermal history, and (3) procurement, examination, and analysis of companion core material located adjacent to or near the lower head material. The specific objectives of the ANL Metallurgical Program, which comprises a major portion of Phase 2, are to prepare metallographic and mechanical test specimen blanks from the TMI-2 lower head material, prepare similar test specimen blanks from suitable archive material subjected to the appropriate thermal processing, determine the mechanical properties of the lower vessel head and archive materials under the conditions of the core-melt accident, and assess the lower head integrity and margin-to-failure during the accident. The ANL work consists of three tasks: (1) archive materials program, (2) fabrication of metallurgical and mechanical test specimens from the TMI-2 pressure vessel samples, and (3) mechanical property characterization of TMI-2 lower pressure vessel head and archive material

  11. Hands-On Educational Programs and Projects at SICSA

    Science.gov (United States)

    Bell, L.

    2002-01-01

    The Sasakawa International Center for Space Architecture (SICSA) has a long history of projects that involve the design of space structures, including habitats for low-Earth orbit (LEO) and planetary applications. Some of these projects are supported by corporate sponsors, such as a space tourism research, planning and design study conducted for the owner of national U.S. hotel chain. Some have been undertaken in support of programs sponsored by the State Government of Texas, including current commercial spaceport development planning for the Texas Aerospace Commission and three counties that represent candidate spaceport sites. Other projects have been supported by NASA and the Texas Aerospace Consortium, including the design and development of SICSA's "Space Habitation Laboratory", a space station module sized environmental simulator facility which has been featured in the "NASA Select" television broadcast series. This presentation will highlight representative projects. SICSA is internationally recognized for its leadership in the field of space architecture. Many program graduates have embarked upon productive and rewarding careers with aerospace organizations throughout the world. NASA has awarded certificates of appreciation to SICSA for significant achievements contributing to its advanced design initiatives. SICSA and its work have been featured in numerous popular magazines, professional publications, and public media broadcasts in many countries. SICSA applies a very comprehensive scope of activities to the practice of space architecture. Important roles include mission planning conceptualization of orbital and planetary structures and assembly processes, and design of habitats to optimize human safety, adaptation and productivity. SICSA sponsors educational programs for upper division undergraduate students and graduate students with interests in space and experimental architecture. Many fourth year participants continue in the SICSA program throughout

  12. 34 CFR 377.1 - What is the Demonstration Projects to Increase Client Choice Program?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What is the Demonstration Projects to Increase Client... PROJECTS TO INCREASE CLIENT CHOICE PROGRAM General § 377.1 What is the Demonstration Projects to Increase Client Choice Program? The Demonstration Projects to Increase Client Choice Program is designed to...

  13. Plutonium immobilization project development and testing technical project office quality assurance program description

    International Nuclear Information System (INIS)

    Gould, T.H.; MacLean, L.M.; Ziemba, J.M.

    1999-01-01

    The Plutonium Immobilization Project (PIP) is one of several fissile materials disposition projects managed by the Department of Energy (DOE) Office of Fissile Materials Disposition (OFMD). The PIP is expected to evolve from the current Development and Testing (D and T) effort, to design, to construction, and finally to operations. Overall management and technical management of the D and T effort resides at the Lead Laboratory, Lawrence Livermore National Laboratory (LLNL), through the LLNL Manager, Fissile Materials Disposition Program (FMDP). Day to day project activities are managed by the D and T Technical Project Office (TPO), which reports to the LLNL Manager, FMDP. The D and T TPO consists of the Technical Manager, the TPO Quality Assurance (QA) Program Manager, and TPO Planning and Support Staff. This Quality Assurance Program Description (QAPD) defines the QA policies and controls that will be implemented by these TPO personnel in their management of D and T activities. This QAPD is consistent with and responsive to the Department of Energy Fissile Materials Disposition Program Quality Assurance Requirements Document (FMDP QARD). As the Project and upper level requirement's documents evolve, this QAPD will be updated as necessary to accurately define and describe the QA Program and Management of the PIP. The TPO has a policy that all development and testing activities be planned, performed and assessed in accordance with its customer's requirements, needs and expectations, and with a commitment to excellence and continuous improvement. The TPO QAPD describes implementation requirements which, when completed, will ensure that the project development and testing activities conform to the appropriate QA requirements. For the program to be effective, the TPO QA Program Manager will ensure that each site participating in D and T activities has developed a QAPD, which meets the customer's requirements, and has a designated quality leader in place. These customer

  14. Project control support services for the National Waste Terminal Storage Program

    International Nuclear Information System (INIS)

    1977-12-01

    The Boeing Engineering and Construction Company has the responsibility to recommend and assist in designing and implementing a project control system for the Office of Waste Isolation. BEC, after analysis of the OWI management structure and techniques utilized, has recommended the implementation of a Program Control System (PCS) for use by OWI. This system embraces the scope of management needs for visibility and control of cost and schedule performance as well as providing a framework for all the various segments of a complete program control system. Because of the schedule constraints placed on OWI by DOE it was not deemed practical to implement all segments of PCS but rather those that are basic to the concept and can return the greatest short-term benefit. The area of cost and schedule control appears to provide the greatest benefit when combined with the control room techniques for visibility and control. Technical performance is not covered in this report. The segment of PCS titled Integrated Cost/Schedule (IC/S) was used to identify those functions unique to cost and schedule control

  15. Supporting Multiple Programs and Projects at NASA's Kennedy Space Center

    Science.gov (United States)

    Stewart, Camiren L.

    2014-01-01

    With the conclusion of the shuttle program in 2011, the National Aeronautics and Space Administration (NASA) had found itself at a crossroads for finding transportation of United States astronauts and experiments to space. The agency would eventually hand off the taxiing of American astronauts to the International Space Station (ISS) that orbits in Low Earth Orbit (LEO) about 210 miles above the earth under the requirements of the Commercial Crew Program (CCP). By privatizing the round trip journey from Earth to the ISS, the space agency has been given the additional time to focus funding and resources to projects that operate beyond LEO; however, adding even more stress to the agency, the premature cancellation of the program that would succeed the Shuttle Program - The Constellation Program (CxP) -it would inevitably delay the goal to travel beyond LEO for a number of years. Enter the Space Launch System (SLS) and the Orion Multipurpose Crew Vehicle (MPCV). Currently, the SLS is under development at NASA's Marshall Spaceflight Center in Huntsville, Alabama, while the Orion Capsule, built by government contractor Lockheed Martin Corporation, has been assembled and is currently under testing at the Kennedy Space Center (KSC) in Florida. In its current vision, SLS will take Orion and its crew to an asteroid that had been captured in an earlier mission in lunar orbit. Additionally, this vehicle and its configuration is NASA's transportation to Mars. Engineers at the Kennedy Space Center are currently working to test the ground systems that will facilitate the launch of Orion and the SLS within its Ground Services Development and Operations (GSDO) Program. Firing Room 1 in the Launch Control Center (LCC) has been refurbished and outfitted to support the SLS Program. In addition, the Spaceport Command and Control System (SCCS) is the underlying control system for monitoring and launching manned launch vehicles. As NASA finds itself at a junction, so does all of its

  16. Lowell Public Library, Final Performance Report for Library Services and Construction Act (LSCA) Title VI, Library Literacy Program.

    Science.gov (United States)

    Maravilla, Virginia

    The Lowell Public Library (Indiana) Adult Literacy Program expanded literacy efforts of the library and its volunteer tutors by increasing the program enrollment numbers of the functionally illiterate English-speaking, English as a Second Language (ESL), migrant workers, and Basic Math students; assisted students in achieving their stated goals in…

  17. The assurance management program for the Nova laser fusion project

    International Nuclear Information System (INIS)

    Levy, A.J.

    1983-01-01

    In a well managed project, Quality Assurance is an integral part of the management activities performed on a daily basis. Management assures successful performance within budget and on schedule by using all the good business, scientific, engineering, quality assurance, and safety practices available. Quality assurance and safety practices employed on Nova are put in perspective by integrating them into the overall function of good project management. The Inertial Confinement Fusion (ICF) approach is explained in general terms. The laser ICF and magnetic fusion facilities are significantly different in that the laser system is used solely as a highly reliable energy source for performing plasma physics experiments related to fusion target development; by contrast, magnetic fusion facilities are themselves the experiments. The Nova project consists of a 10-beam, 74 cm aperture neodymium-glass laser experimental facility which is being constructed by the Lawrence Livermore National Laboratory (LLNL) for the U.S. Department of Energy. Nova has a total estimated cost of $176M and will become operational in the Fall of 1984. The Nova laser will be used as the high energy driver for studying the regime of ignition for ICF. The Nova assurance management program was developed using the quality assurance (QA) approach first implemented at LLNL in early 1978. The LLNL QA program is described as an introduction to the Nova assurance management program. The Nova system is described pictorially through the Nova configuration, subsystems and major components, interjecting the QA techniques which are being pragmatically used to assure the successful completion of the project

  18. NASA Game Changing Development Program Manufacturing Innovation Project

    Science.gov (United States)

    Tolbert, Carol; Vickers, John

    2011-01-01

    This presentation examines the new NASA Manufacturing Innovation Project. The project is a part of the Game Changing Development Program which is one element of the Space Technology Programs Managed by Office of the Chief Technologist. The project includes innovative technologies in model-based manufacturing, digital additive manufacturing, and other next generation manufacturing tools. The project is also coupled with the larger federal initiatives in this area including the National Digital Engineering and Manufacturing Initiative and the Advanced Manufacturing Partnership. In addition to NASA, other interagency partners include the Department of Defense, Department of Commerce, NIST, Department of Energy, and the National Science Foundation. The development of game-changing manufacturing technologies are critical for NASA s mission of exploration, strengthening America s manufacturing competitiveness, and are highly related to current challenges in defense manufacturing activities. There is strong consensus across industry, academia, and government that the future competitiveness of U.S. industry will be determined, in large part, by a technologically advanced manufacturing sector. This presentation highlights the prospectus of next generation manufacturing technologies to the challenges faced NASA and by the Department of Defense. The project focuses on maturing innovative/high payoff model-based manufacturing technologies that may lead to entirely new approaches for a broad array of future NASA missions and solutions to significant national needs. Digital manufacturing and computer-integrated manufacturing "virtually" guarantee advantages in quality, speed, and cost and offer many long-term benefits across the entire product lifecycle. This paper addresses key enablers and emerging strategies in areas such as: Current government initiatives, Model-based manufacturing, and Additive manufacturing.

  19. 45 CFR 1357.20 - Child abuse and neglect programs.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Child abuse and neglect programs. 1357.20 Section... APPLICABLE TO TITLE IV-B § 1357.20 Child abuse and neglect programs. The State agency must assure that, with regard to any child abuse and neglect programs or projects funded under title IV-B of the Act, the...

  20. Quality Assurance Program Plan (QAPP) Waste Management Project

    Energy Technology Data Exchange (ETDEWEB)

    VOLKMAN, D.D.

    1999-10-27

    This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

  1. Libraries of Middlesex, Final Performance Report for Library Services and Construction Act (LSCA) Title VI, Library Literacy Program.

    Science.gov (United States)

    Director, Elissa

    This final performance report for the Libraries of Middlesex literacy project begins with a section that compares actual accomplishments to the following objectives for 1992-93: (1) recruit and enroll at least 150 new volunteers in Basic Reading of English as a Second Language (ESL) tutor training; (2) have at least 125 volunteers successfully…

  2. English Title

    Directory of Open Access Journals (Sweden)

    José Ramón Camacho Camargo

    2015-11-01

    Full Text Available Excessive consumption of paper and poor management of documentation are weaknesses that may have a significant impact on productivity of organizations. For this reason, he began to develop the initiative to implement the concept of “paperless office” in the “Núcleo La Victoria de la Universidad Nacional Experimental Sur del Lago (UNESUR” in Venezuela, part of their academic processes, particularly in the related “Grades and Diplomas Section”. The research conducted was descriptive and feasible project. The proposal identified resource savings associated with implementing this practice. The results indicate that it is feasible to implement and which has a major impact on productivity; however, must be accompanied by measures for backup and information security, so its application in other areas of the university organization will be proposed, which can serve as an example for application in business organizations.

  3. Quality Assurance program plan - plutonium stabilization and handling project W-460

    International Nuclear Information System (INIS)

    SCHULTZ, J.W.

    1999-01-01

    This Quality Assurance Program Plan (QAPP) identifies Project Quality Assurance (QA) program requirements for all parties participating in the design, procurement, demolition, construction, installation, inspection and testing for Project W-460

  4. 75 FR 26945 - International Education Programs Service-Fulbright-Hays Group Projects Abroad Program

    Science.gov (United States)

    2010-05-13

    .... Schools and/or departments of education have a role to play in creating greater exposure since they are... DEPARTMENT OF EDUCATION International Education Programs Service--Fulbright-Hays Group Projects... Postsecondary Education, Department of Education. ACTION: Notice of proposed priorities. SUMMARY: The Assistant...

  5. Salt Repository Project Waste Package Program Plan: Draft

    International Nuclear Information System (INIS)

    Carr, J.A.; Cunnane, J.C.

    1986-01-01

    Under the direction of the Office of Civilian Radioactive Waste Management (OCRWM) created within the DOE by direction of the Nuclear Waste Policy Act of 1982 (NWPA), the mission of the Salt Repository Project (SRP) is to provide for the development of a candidate salt repository for disposal of high-level radioactive waste (HLW) and spent reactor fuel in a manner that fully protects the health and safety of the public and the quality of the environment. In consideration of the program needs and requirements discussed above, the SRP has decided to develop and issue this SRP Waste Package Program Plan. This document is intended to outline how the SRP plans to develop the waste package design and to show, with reasonable assurance, that the developed design will satisfy applicable requirements/performance objectives. 44 refs., 16 figs., 16 tabs

  6. Migrant Education Programs Under ESEA Title I Migrant Amendment. (Programas de Educacion Migrante bajo el Titulo I de ESEA.)

    Science.gov (United States)

    Minkler, Elton D.

    Migrant Education Programs are designed for those students who, because of the migratory nature of their parents' employment, are required to move from one school district to another during the school year. In many instances these students, because of sporadic attendance and discontinuity of their educational experiences, have found it difficult,…

  7. 76 FR 19757 - The Federal Student Aid Programs Under Title IV of the Higher Education Act of 1965, as Amended

    Science.gov (United States)

    2011-04-08

    ... institutional verification program, which ultimately makes the financial aid process easier for students, while... institutions to develop and implement their own comprehensive systems to verify student financial aid... institutions have addressed not only the accuracy of student aid awards and payments, but also the management...

  8. Native flora rescue program: GASENE project case study

    Energy Technology Data Exchange (ETDEWEB)

    Serricchio, Claudio; Caldas, Flaviana V [PETROBRAS, Rio de Janeiro, RJ (Brazil); Akahori, Lisa [Telsan, Rio de Janeiro, RJ (Brazil); Jacomelli, Junior, Jose Almir [AGF Engenharia, Araucaria, PR (Brazil)

    2009-07-01

    Concerning the surrounding flora, the implementation of pipelines may cause fragmentation and isolation of the remaining natural vegetation, possibly changing the forest structure; thus raising the border effect; modifying the ratio of species and life forms, decreasing the vegetal diversity and/or causing a lack of connectivity among the remaining indigenous forest resources. In the case of pipelines, the most important environmental measure intended to mitigate the damage caused to the flora is the adoption of Indigenous Flora Rescue Programs. This paper is aimed at analyzing the programs currently applied during the implementation of the GASENE project, by conducting a case study. The main targets of such program are obtaining seeds and fruits with a view to subsidize the potential production of sapling to be further employed in the recovery of areas impacted by the pipeline works; and then relocate the most significant samples of species rescued from the suppressed areas in order to comprise forest areas adjacent to the pipeline's right-of-way. The programs had little differences in their methodology while being implemented, however, we consider that up to the present moment the results obtained in the preservation of species of native flora have been satisfactory. (author)

  9. Native flora rescue program: GASENE project case study

    Energy Technology Data Exchange (ETDEWEB)

    Serricchio, Claudio; Caldas, Flaviana V. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Akahori, Lisa [Telsan, Rio de Janeiro, RJ (Brazil); Jacomelli Junior, Jose Almir [AGF Engenharia, Araucaria, PR (Brazil)

    2009-07-01

    Concerning the surrounding flora, the implementation of pipelines may cause fragmentation and isolation of the remaining natural vegetation, possibly changing the forest structure; thus raising the border effect; modifying the ratio of species and life forms, decreasing the vegetal diversity and/or causing a lack of connectivity among the remaining indigenous forest resources. In the case of pipelines, the most important environmental measure intended to mitigate the damage caused to the flora is the adoption of Indigenous Flora Rescue Programs. This paper is aimed at analyzing the programs currently applied during the implementation of the GASENE project, by conducting a case study. The main targets of such program are obtaining seeds and fruits with a view to subsidize the potential production of sapling to be further employed in the recovery of areas impacted by the pipeline works; and then relocate the most significant samples of species rescued from the suppressed areas in order to comprise forest areas adjacent to the pipeline's right-of-way. The programs had little differences in their methodology while being implemented, however, we consider that up to the present moment the results obtained in the preservation of species of native flora have been satisfactory. (author)

  10. Summaries of the Idaho National Engineering Laboratory Radioecology and Ecology Program research projects

    International Nuclear Information System (INIS)

    Markham, O.D.

    1987-06-01

    This report provides summaries of individual research projects conducted by the Idaho National Engineering Laboratory Radioecology and Ecology Program. Summaries include projects in various stages, from those that are just beginning, to projects that are in the final publication stage

  11. 20 CFR 416.250 - Experimental, pilot, and demonstration projects in the SSI program.

    Science.gov (United States)

    2010-04-01

    ... administration of the SSI program. These projects will test the advantages of altering certain requirements... demonstration project will have a termination date (up to 10 years from the start of the project). [48 FR 7576...

  12. Designing an Academic Project Management Program: A Collaboration between a University and a PMI Chapter

    Science.gov (United States)

    Poston, Robin S.; Richardson, Sandra M.

    2011-01-01

    The demand for project management skills in industry is increasing resulting in a higher demand for project management educational programs. Universities are addressing industry demand by developing project management courses, degree offerings and certificate programs that focus on both technical and general project management skills. While…

  13. TMI-2 Vessel Investigation Project (VIP) Metallurgical Program

    International Nuclear Information System (INIS)

    Diercks, D.R.; Neimark, L.A.

    1991-01-01

    The Three Mile Island Unite 2 (TMI-2) Vessel Investigation Project Metallurgical Program is a part of the international TMI-2 Vessel Investigation Project being conducted jointly by the U.S. Nuclear Regulatory Commission and the Organization for Economic Cooperation and Development. The objectives of the metallurgical program are to deduce the temperatures of, determine the mechanical properties of, and assess the integrity of the TMI-2 lower head during the loss-of-coolant accident. Fifteen samples have been removed from the lower head and are being examined. In addition, archive material from the lower head of the Midland nuclear reactor has been procured for conducting supplemental metallurgical evaluations and mechanical property determinations. Evaluations of the microstructure and mechanical properties of the as-received archive material have been completed, and a series of heat treatment experiments has been conducted to develop standard microstructures to be compared with those present in the TMI-2 samples. Results have been obtained from examinations of two of the fifteen TMI-2 lower head samples. These results indicate that one of these two samples, which contained cracks in the weld cladding extending ∼3 mm into the underlying base metal, apparently reached temperatures on the order of 1000 to 1100C during the accident. A preliminary examination of the core debris deposited on this sample has been performed. The other sample, from an area away from the region of core relocation, did not exceed 727C during the accident

  14. What is the role of a project or program manager in implementing and maintaining a quality assurance program

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    The task of managing a government-funded program has changed significantly from the days when a program manager managed the funds and depended on reports from a contractor to measure the program's progress. Today's manager of waste management program must be personally involved in every aspect of the program. The successful manager of a waste management program will lead the development of management controls to ensure successful accomplishment of project objectives. This paper describes the responsibilities of the project manager, the quality assurance staff and how they interface to develop and implement a quality assurance program for a waste management program

  15. Issues in NASA Program and Project Management. Special Report: 1997 Conference. Project Management Now and in the New Millennium

    Science.gov (United States)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics Considered Include: NASA's Shared Experiences Program; Core Issues for the Future of the Agency; National Space Policy Strategic Management; ISO 9000 and NASA; New Acquisition Initiatives; Full Cost Initiative; PM Career Development; PM Project Database; NASA Fast Track Studies; Fast Track Projects; Earned Value Concept; Value-Added Metrics; Saturn Corporation Lessons Learned; Project Manager Credibility.

  16. Evaluating the High School Lunar Research Projects Program

    Science.gov (United States)

    Shaner, A. J.; Shupla, C.; Shipp, S.; Allen, J.; Kring, D. A.

    2013-01-01

    The Center for Lunar Science and Exploration (CLSE), a collaboration between the Lunar and Planetary Institute and NASA s Johnson Space Center, is one of seven member teams of the NASA Lunar Science Institute (NLSI). In addition to research and exploration activities, the CLSE team is deeply invested in education and outreach. In support of NASA s and NLSI s objective to train the next generation of scientists, CLSE s High School Lunar Research Projects program is a conduit through which high school students can actively participate in lunar science and learn about pathways into scientific careers. The objectives of the program are to enhance 1) student views of the nature of science; 2) student attitudes toward science and science careers; and 3) student knowledge of lunar science. In its first three years, approximately 168 students and 28 teachers from across the United States have participated in the program. Before beginning their research, students undertake Moon 101, a guided-inquiry activity designed to familiarize them with lunar science and exploration. Following Moon 101, and guided by a lunar scientist mentor, teams choose a research topic, ask their own research question, and design their own research approach to direct their investigation. At the conclusion of their research, teams present their results to a panel of lunar scientists. This panel selects four posters to be presented at the annual Lunar Science Forum held at NASA Ames. The top scoring team travels to the forum to present their research in person.

  17. Project characteristics monitoring report: BWIP (Basalt Waste Isolation Program) repository project

    Energy Technology Data Exchange (ETDEWEB)

    Friedli, E.A.; Herborn, D.I.; Taylor, C.D.; Tomlinson, K.M.

    1988-03-01

    This monitoring report has been prepared to show compliance with provisions of the Nuclear Waste Policy Act of 1982 (NWPA) and to provide local and state government agencies with information concerning the Basalt Waste Isolation Program (BWIP). This report contains data for the time period May 26, 1986 to February 1988. The data include employment figures, salaries, project purchases, taxes and fees paid, worker survey results, and project closedown personal interview summaries. This information has become particularly important since the decision in December 1987 to stop all BWIP activities except those for site reclamation. The Nuclear Waste Policy Amendments Act of 1987 requires nonreclamation work at the Hanford Site to stop as of March 22, 1988. 7 refs., 6 figs., 28 tabs.

  18. Project characteristics monitoring report: BWIP [Basalt Waste Isolation Program] repository project

    International Nuclear Information System (INIS)

    Friedli, E.A.; Herborn, D.I.; Taylor, C.D.; Tomlinson, K.M.

    1988-03-01

    This monitoring report has been prepared to show compliance with provisions of the Nuclear Waste Policy Act of 1982 (NWPA) and to provide local and state government agencies with information concerning the Basalt Waste Isolation Program (BWIP). This report contains data for the time period May 26, 1986 to February 1988. The data include employment figures, salaries, project purchases, taxes and fees paid, worker survey results, and project closedown personal interview summaries. This information has become particularly important since the decision in December 1987 to stop all BWIP activities except those for site reclamation. The Nuclear Waste Policy Amendments Act of 1987 requires nonreclamation work at the Hanford Site to stop as of March 22, 1988. 7 refs., 6 figs., 28 tabs

  19. Risk Management System and Project Staff Education Program for Overseas Construction Project Using the Expert System

    OpenAIRE

    Hirota, Yoichi

    2007-01-01

    The turnover of the Japanese contractors and the consulting firms has kept the same level since 1983, in spite of the fact that the size of domestic market is shrinking. This is why they do not have a proper management system, especially risk management system for the overseas construction projects. This study aims at building risk management system and developing education program that can be applied to reinforcing the ability, based on the author’s experience. Risk is defined as “uncertain ...

  20. Seismic safety margins research program. Project I SONGS 1 AFWS Project

    International Nuclear Information System (INIS)

    Chuang, T.Y.; Smith, P.D.; Dong, R.G.; Bernreuter, D.L.; Bohn, M.P.; Cummings, G.E.; Wells, J.E.

    1981-01-01

    The seismic qualification requirements of auxiliary feedwater systems (AFWS) of Pressurized Water Reactors (PWR) were developed over a number of years. These are formalized in the publication General Design Criteria (Appendix A to 10CFR50). The full recognition of the system as an engineered safety feature did not occur until publication of the Standard Review Plan (1975). Efforts to determine how to backfit seismic requirements to earlier plants has been undertaken primarily in the Systematic Evaluation Program (SEP) for a limited number of operating reactors. Nuclear Reactor Research (RES) and NRR have requested LLNL to perform a probabilistic study on the AFWS of San Onofre Nuclear Generating Station (SONGS) Unit 1 utilizing the tools developed by the Seismic Safety Margins Research Program (SSMRP). The main objectives of this project are to: identify the weak links of AFWS; compare the failure probabilities of SONGS 1 and Zion 1 AFWS: and compare the seismic responses due to different input spectra and design values

  1. Aviation Safety Program: Weather Accident Prevention (WxAP) Project Overview and Status

    Science.gov (United States)

    Nadell, Shari-Beth

    2003-01-01

    This paper presents a project overview and status for the Weather Accident Prevention (WxAP) aviation safety program. The topics include: 1) Weather Accident Prevention Project Background/History; 2) Project Modifications; 3) Project Accomplishments; and 4) Project's Next Steps.

  2. Evaluating the High School Lunar Research Projects Program

    Science.gov (United States)

    Shaner, A. J.; Shipp, S. S.; Allen, J.; Kring, D. A.

    2012-12-01

    The Center for Lunar Science and Exploration (CLSE), a collaboration between the Lunar and Planetary Institute and NASA's Johnson Space Center, is one of seven member teams of the NASA Lunar Science Institute (NLSI). In addition to research and exploration activities, the CLSE team is deeply invested in education and outreach. In support of NASA's and NLSI's objective to train the next generation of scientists, CLSE's High School Lunar Research Projects program is a conduit through which high school students can actively participate in lunar science and learn about pathways into scientific careers. The objectives of the program are to enhance 1) student views of the nature of science; 2) student attitudes toward science and science careers; and 3) student knowledge of lunar science. In its first three years, approximately 140 students and 28 teachers from across the United States have participated in the program. Before beginning their research, students undertake Moon 101, a guided-inquiry activity designed to familiarize them with lunar science and exploration. Following Moon 101, and guided by a lunar scientist mentor, teams choose a research topic, ask their own research question, and design their own research approach to direct their investigation. At the conclusion of their research, teams present their results to a panel of lunar scientists. This panel selects four posters to be presented at the annual Lunar Science Forum held at NASA Ames. The top scoring team travels to the forum to present their research. Three instruments have been developed or modified to evaluate the extent to which the High School Lunar Research Projects meets its objectives. These three instruments measure changes in student views of the nature of science, attitudes towards science and science careers, and knowledge of lunar science. Exit surveys for teachers, students, and mentors were also developed to elicit general feedback about the program and its impact. The nature of science

  3. FAIR - Facility, Research Program and Status of the Project

    International Nuclear Information System (INIS)

    Majka, Z.

    2011-01-01

    The international Facility for Antiproton and Ion Research (FAIR) in Europe will provide a worldwide science community with a unique and technically innovative accelerator system to perform forefront research in the sciences concerned with the basic structure of matter, and in intersections with other fields. The facility will deliver an extensive range of primary and secondary particle beams from protons and their antimatter partners, antiprotons, to ion beams of all chemical elements up to the heaviest, uranium, with in many respects unique properties and intensities. The paper will include overview of the new facility design and research programs to be carried out there. The current status of the FAIR project will be also presented. (author)

  4. Brazilian Irradiation Project: CAFE-MOD1 validation experimental program

    International Nuclear Information System (INIS)

    Mattos, Joao Roberto Loureiro de; Costa, Antonio Carlos L. da; Esteves, Fernando Avelar; Dias, Marcio Soares

    1999-01-01

    The Brazilian Irradiation Project whose purpose is to provide Brazil with a minimal structure to qualify the design, fabrication and quality procedures of nuclear fuels, consists of three main facilities: IEA-R1 reactor of IPEN-CNEN/SP, CAFE-MOD1 irradiation device and a unit of hot cells. The CAFE-MOD1 is based on concepts successfully used for more than 20 years in the main nuclear institutes around the world. Despite these concepts are already proved it should be adapted to each reactor condition. For this purpose, there is an ongoing experimental program aiming at the certification of the criteria and operational limits of the CAFE-MOD1 in order to get the allowance for its installation at the IEA-R1 reactor. (author)

  5. 30 CFR 402.10 - Research-project applications.

    Science.gov (United States)

    2010-07-01

    ... project title, project objectives, background information, research tasks, methodology to conduct the... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Research-project applications. 402.10 Section... PROGRAM AND THE WATER-RESOURCES TECHNOLOGY DEVELOPMENT PROGRAM Application, Evaluation, and Management...

  6. Light Water Reactor Sustainability Program: Digital Architecture Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Ken [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    There are many technologies available to the nuclear power industry to improve efficiency in plant work activities. These range from new control room technologies to those for mobile field workers. They can make a positive impact on a wide range of performance objectives – increase in productivity, human error reduction, validation of results, accurate transfer of data, and elimination of repetitive tasks. It is expected that the industry will more and more turn to these technologies to achieve these operational efficiencies to lower costs. At the same time, this will help utilities manage a looming staffing problem as the inevitable retirement wave of the more seasoned workers affects both staffing levels and knowledge retention. A barrier to this wide-scale implementation of new technologies for operational efficiency is the lack of a comprehensive digital architecture that can support the real-time information exchanges needed to achieve the desired operational efficiencies. This project will define an advanced digital architecture that will accommodate the entire range of system, process, and plant worker activity to enable the highest degree of integration, thereby creating maximum efficiency and productivity. This pilot project will consider a range of open standards that are suitable for the various data and communication requirements of a seamless digital environment. It will map these standards into an overall architecture to support the II&C developments of this research program.

  7. Japan's Sunshine Project. Solar energy R and D program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-05-01

    This paper explains the Sunshine Project and its solar energy R and D program. The solar energy is poured into the earth at 1.04 x 10{sup 17} kcal per hour, while the energy consumption of the world in 1970 is equivalent to 30 minutes of the solar energy. It is infinite compared to fossil fuel and clean, with no extreme partiality by areas. Its problem in utilization, however, is the low energy density of 1 kw/m{sup 2} and unsteady supply caused by weather conditions, which raises difficulties in matching energy demand. These demerits and low competitiveness in cost must be overcome through R and D. Under the Sunshine Project, the solar energy utilization is in progress in the areas of thermal utilization in a building, solar thermal power generation, and photovoltaic power generation. The budget was 9.6 billion yen for fiscal 1980 and 8 billion yen for fiscal 1981. Since fiscal 1980, emphasis has been placed particularly on photovoltaic power generation. The experimental production of solar cells of 500 kW/year is scheduled as a target through fiscal 1981-82. Four demonstration plants and two central distributing substations for photovoltaic power generation are planned to be built by fiscal 1985. Also to be studied are 2 solar thermal power generation plants of 1,000 kWe each and a solar thermal system for industrial process heating. (NEDO)

  8. Environmental Field Surveys, EMF Rapid Program, Engineering Project No.3

    Energy Technology Data Exchange (ETDEWEB)

    Enertech Consultants

    1996-04-01

    The EMF Research and Public Information Dissemination Program (RAPID) includes several engineering research in the area of exposure assessment and source characterization. RAPID engineering project No. 3: ''Environmental Field Surveys'' was performed to obtain information on the levels and characteristics of different environments, for which only limited data were available, especially in comparison to magnetic field data for the residential environment and for electric utility facilities, such as power lines and substations. This project was also to provide information on the contribution of various field sources in the surveyed environments. Magnetic field surveys were performed at four sites for each of five environments: schools, hospitals, office buildings, machine shops, and grocery stores. Of the twenty sites surveyed, 11 were located in the San Francisco Bay Area and 9 in Massachusetts. The surveys used a protocol based on magnetic field measurements and observation of activity patterns, designed to provide estimates of magnetic field exposure by type of people and by type of sources. The magnetic field surveys conducted by this project produced a large amount of data which will form a part of the EMF measurement database Field and exposure data were obtained separately for ''area exposure'' and ''at exposure points''. An exposure point is a location where persons engage in fixed, site specific activities near a local source that creates a significant increase in the area field. The area field is produced by ''area sources'', whose location and field distribution is in general not related to the location of the people in the area.

  9. UMTRA Project-Level Cost Reduction/Productivity Improvement Program manual

    International Nuclear Information System (INIS)

    1995-06-01

    Mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project Cost Reduction/Productivity Improvement Program (CR/PIP) is to contribute to the UMTRA Project's environmental restoration mission by providing the means to achieve and recognize continuous improvements and cost savings. This manual includes program definition, description of UMTRA project organizational responsibilities and interfaces with existing project functions, guidance to contractors, and definition of project-level functions

  10. Browse Title Index

    African Journals Online (AJOL)

    2004): Special Issue 2004, Differential production of immune parameters by mouse strains ... agglutination and complement fixation tests in the field diagnosis ... List All Titles · Free To Read Titles This Journal is Open Access.

  11. Association between postgraduate year 2 residency program characteristics and primary project publication.

    Science.gov (United States)

    Swanson, Joseph M; Shafeeq, Hira; Hammond, Drayton A; Li, Chenghui; Devlin, John W

    2018-03-15

    The association among residency program and research mentor characteristics, program director perceptions, and the publication of the primary research project for postgraduate year 2 (PGY2) graduates was assessed. Using a validated electronic survey, residency program directors (RPDs) of critical care PGY2 graduates were asked about primary research project publication success, program and research project mentor characteristics, and RPDs' perceptions surrounding project completion. All 55 RPDs surveyed responded; 44 (79%) reported being a research project mentor. PGY2 research project publications in 2011 and 2012 totaled 26 (37%) and 27 (35%), respectively. A significant relationship existed between research project publication and the number of residents in the program ( p project publication is important to their employer ( p projects versus no publications included the number of graduates in the PGY2 program (odds ratio [OR], 5.6; p project publication (OR, 10.2; p project versus no research projects was also independently associated with the RPD's perception that the employer valued research project publication (OR, 5.1; p = 0.04). A survey of RPDs of critical care PGY2 residents found that the number of PGY2 residents, the number of publications by the least experienced research mentor, and the perception that publishing the residents' research projects is important to the employer were independently associated with publication rates of residency research projects. Copyright © 2018 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  12. Quality assurance program plan for the Radiological Survey Activities Program - Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Ramos, S.J.; Berven, B.A.; Little, C.A.

    1986-01-01

    The Radiological Survey Activities (RASA) program at Oak Ridge National Laboratory (ORNL) is responsible for surveying designated sites in the vicinity of 24 inactive mill sites involved in the Department of Energy's (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP). The purpose of these surveys is to provide a recommendation to DOE whether to include or exclude the site from UMTRAP based on whether the onsite residual radioactive material (if any) originated from the former mill sites, and radiation levels onsite are in excess of appropriate Environmental Protection Agency (EPA) criteria. This report describes the quality assurance program plan for the RASA program in conducting all activities related to the UMTRA project. All quality assurance provisions given by the DOE, DOE/UMTRA, and ORNL organizations are integrated into this plan. Specifically, this report identifies the policies and procedures followed in accomplishing the RASA/UMTRAP QA program, identifies those organizational units involved in the implementation of these procedures, and outlines the respective responsibilities of those groups

  13. Quality assurance program plan for the radiological survey activities program: Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Ramos, S.J.; Berven, B.A.; Little, C.A.

    1986-08-01

    The Radiological Survey Activities (RASA) program at Oak Ridge National Laboratory (ORNL) is responsible for surveying designated sites in the vicinity of 24 inactive mill sites involved in the Department of Energy's (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP). The purpose of these surveys is to provide a recommendation to DOE whether to include or exclude the site from UMTRAP based on whether the onsite residual radioactive material (if any) originated from the former mill sites, and radiation levels onsite are in excess of appropriate Environmental Protection Agency (EPA) criteria. This report describes the quality assurance program plan for the RASA program in conducting all activities related to the UMTRA project. All quality assurance provisions given by the DOE, DOE/UMTRA, and ORNL organizations are integrated into this plan. Specifically, this report identifies the policies and procedures followed in accomplishing the RASA/UMTRAP QA program, identifies those organizational units involved in the implementation of these procedures, and outlines the respective responsibilities of those groups

  14. Kodak Skills Enhancement Program. U.S. Department of Education National Workplace Literacy Project. Final Report.

    Science.gov (United States)

    Beaudin, Bart P.

    The Kodak Skills Enhancement program was a workplace literacy project funded through the U.S. Department of Education's National Workplace Literacy Program. The project goals were as follows: (1) establish a positive climate within the Kodak corporate environment to ensure program effectiveness by garnering support at all levels; (2) determine the…

  15. MG SPROUTS: A Project-in-a-Box Approach to Educational Programming

    Science.gov (United States)

    Dorn,Sheri; Slagle, Krissy

    2016-01-01

    MG SPROUTS was developed as a "project-in-a-box" program, a self-contained educational programming tool for Extension agents working with master gardener Extension volunteers (MGEVs). The program design incorporates programmatic materials and project management materials and follows best management practices for volunteer management. MG…

  16. 34 CFR 637.11 - What kinds of projects are supported by this program?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What kinds of projects are supported by this program...) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of Projects Does the Secretary Assist Under This Program? § 637.11 What kinds of...

  17. The seismic project of the National Tsunami Hazard Mitigation Program

    Science.gov (United States)

    Oppenheimer, D.H.; Bittenbinder, A.N.; Bogaert, B.M.; Buland, R.P.; Dietz, L.D.; Hansen, R.A.; Malone, S.D.; McCreery, C.S.; Sokolowski, T.J.; Whitmore, P.M.; Weaver, C.S.

    2005-01-01

    In 1997, the Federal Emergency Management Agency (FEMA), National Oceanic and Atmospheric Administration (NOAA), U.S. Geological Survey (USGS), and the five western States of Alaska, California, Hawaii, Oregon, and Washington joined in a partnership called the National Tsunami Hazard Mitigation Program (NTHMP) to enhance the quality and quantity of seismic data provided to the NOAA tsunami warning centers in Alaska and Hawaii. The NTHMP funded a seismic project that now provides the warning centers with real-time seismic data over dedicated communication links and the Internet from regional seismic networks monitoring earthquakes in the five western states, the U.S. National Seismic Network in Colorado, and from domestic and global seismic stations operated by other agencies. The goal of the project is to reduce the time needed to issue a tsunami warning by providing the warning centers with high-dynamic range, broadband waveforms in near real time. An additional goal is to reduce the likelihood of issuing false tsunami warnings by rapidly providing to the warning centers parametric information on earthquakes that could indicate their tsunamigenic potential, such as hypocenters, magnitudes, moment tensors, and shake distribution maps. New or upgraded field instrumentation was installed over a 5-year period at 53 seismic stations in the five western states. Data from these instruments has been integrated into the seismic network utilizing Earthworm software. This network has significantly reduced the time needed to respond to teleseismic and regional earthquakes. Notably, the West Coast/Alaska Tsunami Warning Center responded to the 28 February 2001 Mw 6.8 Nisqually earthquake beneath Olympia, Washington within 2 minutes compared to an average response time of over 10 minutes for the previous 18 years. ?? Springer 2005.

  18. Industrial Program of Waste Management - Cigeo Project - 13033

    Energy Technology Data Exchange (ETDEWEB)

    Butez, Marc [Agence nationale pour la gestion des dechets radioactifs - Andra, 1-7, rue Jean Monnet 92298 Chatenay-Malabry (France); Bartagnon, Olivier; Gagner, Laurent [AREVA NC Tour AREVA 1 place de la Coupole 92084 Paris La Defense (France); Advocat, Thierry; Sacristan, Pablo [Commissariat a l' energie atomique et aux energies alternatives - CEA, CEA-SACLAY 91191 Gif sur Yvette Cedex (France); Beguin, Stephane [Electricite de France - EDF, Division Combustible Nucleaire, 1, Place Pleyel Site Cap Ampere93282 Saint Denis (France)

    2013-07-01

    The French Planning Act of 28 June 2006 prescribed that a reversible repository in a deep geological formation be chosen as the reference solution for the long-term management of high-level and intermediate-level long-lived radioactive waste. It also entrusted the responsibility of further studies and design of the repository (named Cigeo) upon the French Radioactive Waste Management Agency (Andra), in order for the review of the creation-license application to start in 2015 and, subject to its approval, the commissioning of the repository to take place in 2025. Andra is responsible for siting, designing, implementing, operating the future geological repository, including operational and long term safety and waste acceptance. Nuclear operators (Electricite de France (EDF), AREVA NC, and the French Commission in charge of Atomic Energy and Alternative Energies (CEA) are technically and financially responsible for the waste they generate, with no limit in time. They provide Andra, on one hand, with waste packages related input data, and on the other hand with their long term industrial experiences of high and intermediate-level long-lived radwaste management and nuclear operation. Andra, EDF, AREVA and CEA established a cooperation agreement for strengthening their collaborations in these fields. Within this agreement Andra and the nuclear operators have defined an industrial program for waste management. This program includes the waste inventory to be taken into account for the design of the Cigeo project and the structural hypothesis underlying its phased development. It schedules the delivery of the different categories of waste and defines associated flows. (authors)

  19. Gas quality analysis and evaluation program for project Gasbuggy

    Energy Technology Data Exchange (ETDEWEB)

    Smith, C F [Lawrence Radiation Laboratory, University of California, Livermore, CA (United States)

    1970-05-01

    Experimental results of the gas quality analysis program for Project Gasbuggy through August 1969 are presented graphically, addressing the questions raised by the preshot program goals. The chemical composition and the concentrations of tritium, krypton-85, carbon-14 and argon-37, 39 are presented as a function of time and gas production from the nuclear chimney. Chemically, the presence of CO{sub 2}, CO and H{sub 2} served to dilute the formation gas and caused reactions which significantly altered the gas composition at early times. The radionuclide content of the chimney gas at reentry was some 800 pCi/cm{sup 3} of which about 80% was CH{sub 3}T. Lesser quantities of tritium were observed as HT, C{sub 2}H{sub 5}T and C{sub 3}H{sub 7}T. The other major contaminant was Kr{sup 85} which was present at about one-fifth the level of CH{sub 3}T. Small quantities of carbon-14 and argon-39 were also identified. The only other radionuclides identified in the gas were relatively short-lived rare gases. During the production testing, about two and one-half chimney volumes of gas at formation pressure were removed. This removal, accompanied by dilution, has reduced the radionuclide concentrations to about 7% of their levels at reentry. The production characteristics of the Gasbuggy environment prevented an adequate test of the effectiveness of chimney flushing. However, the rapid drawdown concept is supported by the available data as an effective means of reducing contaminant levels. The changes in composition during production or testing are seen to be consistent with a model involving a non-uniform gas influx rate and flow distribution over the chimney region. Mixing times are estimated to be on the order of a few days, so that increasing concentrations following a sudden gas influx can be explained. (author)

  20. Industrial Program of Waste Management - Cigeo Project - 13033

    International Nuclear Information System (INIS)

    Butez, Marc; Bartagnon, Olivier; Gagner, Laurent; Advocat, Thierry; Sacristan, Pablo; Beguin, Stephane

    2013-01-01

    The French Planning Act of 28 June 2006 prescribed that a reversible repository in a deep geological formation be chosen as the reference solution for the long-term management of high-level and intermediate-level long-lived radioactive waste. It also entrusted the responsibility of further studies and design of the repository (named Cigeo) upon the French Radioactive Waste Management Agency (Andra), in order for the review of the creation-license application to start in 2015 and, subject to its approval, the commissioning of the repository to take place in 2025. Andra is responsible for siting, designing, implementing, operating the future geological repository, including operational and long term safety and waste acceptance. Nuclear operators (Electricite de France (EDF), AREVA NC, and the French Commission in charge of Atomic Energy and Alternative Energies (CEA) are technically and financially responsible for the waste they generate, with no limit in time. They provide Andra, on one hand, with waste packages related input data, and on the other hand with their long term industrial experiences of high and intermediate-level long-lived radwaste management and nuclear operation. Andra, EDF, AREVA and CEA established a cooperation agreement for strengthening their collaborations in these fields. Within this agreement Andra and the nuclear operators have defined an industrial program for waste management. This program includes the waste inventory to be taken into account for the design of the Cigeo project and the structural hypothesis underlying its phased development. It schedules the delivery of the different categories of waste and defines associated flows. (authors)

  1. Regulatory research and support program for 1988/89 - project descriptions

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-03-15

    Information Bulletin, 1988. Project descriptions for the Regulatory Research and Support Program. This Information Bulletin contains a list of the projects with a brief description of each, and additional supporting information.

  2. Regulatory research and support program for 1988/89 - project descriptions

    International Nuclear Information System (INIS)

    1988-01-01

    Information Bulletin, 1988. Project descriptions for the Regulatory Research and Support Program. This Information Bulletin contains a list of the projects with a brief description of each, and additional supporting information

  3. Use of GIS technologies to facilitate the transportation project programming process.

    Science.gov (United States)

    2008-05-01

    Transportation project programming in a transportation agency is a process of matching : potential projects with available funds to accomplish the agencys mission and goals of a : given period of time. Result of this process is normally a transpor...

  4. Project Management Plan for the Idaho National Engineering Laboratory Waste Isolation Pilot Plant Experimental Test Program

    International Nuclear Information System (INIS)

    Connolly, M.J.; Sayer, D.L.

    1993-11-01

    EG ampersand G Idaho, Inc. and Argonne National Laboratory-West (ANL-W) are participating in the Idaho National Engineering Laboratory's (INEL's) Waste Isolation Pilot Plant (WIPP) Experimental Test Program (WETP). The purpose of the INEL WET is to provide chemical, physical, and radiochemical data on transuranic (TRU) waste to be stored at WIPP. The waste characterization data collected will be used to support the WIPP Performance Assessment (PA), development of the disposal No-Migration Variance Petition (NMVP), and to support the WIPP disposal decision. The PA is an analysis required by the Code of Federal Regulations (CFR), Title 40, Part 191 (40 CFR 191), which identifies the processes and events that may affect the disposal system (WIPP) and examines the effects of those processes and events on the performance of WIPP. A NMVP is required for the WIPP by 40 CFR 268 in order to dispose of land disposal restriction (LDR) mixed TRU waste in WIPP. It is anticipated that the detailed Resource Conservation and Recovery Act (RCRA) waste characterization data of all INEL retrievably-stored TRU waste to be stored in WIPP will be required for the NMVP. Waste characterization requirements for PA and RCRA may not necessarily be identical. Waste characterization requirements for the PA will be defined by Sandia National Laboratories. The requirements for RCRA are defined in 40 CFR 268, WIPP RCRA Part B Application Waste Analysis Plan (WAP), and WIPP Waste Characterization Program Plan (WWCP). This Project Management Plan (PMP) addresses only the characterization of the contact handled (CH) TRU waste at the INEL. This document will address all work in which EG ampersand G Idaho is responsible concerning the INEL WETP. Even though EG ampersand G Idaho has no responsibility for the work that ANL-W is performing, EG ampersand G Idaho will keep a current status and provide a project coordination effort with ANL-W to ensure that the INEL, as a whole, is effectively and

  5. Design of training programs for a positive youth development program: Project P.A.T.H.S. in Hong Kong.

    Science.gov (United States)

    Shek, Daniel T L; Chak, Yammy L Y

    2010-01-01

    To facilitate the implementation of the Secondary 1 to Secondary 3 program of the Project P.A.T.H.S. in Hong Kong, systematic training programs are designed for the potential program implementers. The rationales, objectives and design of the Secondary 1 to Secondary 3 training programs are outlined in this paper. The training programs cover theories of adolescent development, positive youth development, background and curricula of the Project P.A.T.H.S., factors affecting program implementation quality and evaluation of the project. Besides introducing the curriculum units, the training programs also focus on nature of learning and related theories (particularly experiential learning), teaching methods and instructional techniques, motivating students, and classroom management.

  6. Transportation risk management : international practices for program development and project delivery.

    Science.gov (United States)

    2012-08-01

    Managing transportation networks, including agency : management, program development, and project : delivery, is extremely complex and fraught with : uncertainty. Administrators, planners, and engineers : coordinate a multitude of organizational and ...

  7. Penerapan Program Microsoft Project 2010 untuk Perencanaan dan Pengendalian pada Pembangunan Gedung Serbaguna Fakultas Kedokteran

    OpenAIRE

    Santoso, Erick; Rafie; Wardhani, Nurul

    2014-01-01

    Banyak program komputer yang dikembangkan untuk membantu dalam bidang Teknik Sipil diantaranya Microsoft Project 2010yang dibuat oleh Microsoft. Program ini dapat membantu para manajemen proyek konstruksi dalam merencanakan suatu proyek dan mengontrol setiap pekerjaan yang dikerjakan.

  8. Evaluation of Current Automated Civil Engineer System Non-Appropriated Funds Project Programming Procedures

    National Research Council Canada - National Science Library

    Ligday, Joshua

    2004-01-01

    ...) project programming business rules within ACES. These problem areas were not addressed until recently when an integrated process team met and proposed numerous changes to how NAF programming is accomplished in ACES...

  9. Quality Managment Program (QMP) report: A review of quality management programs developed in response to Title 10, Section 35.32 of the Code of Federal Regulations

    Energy Technology Data Exchange (ETDEWEB)

    Witte, M.C.

    1994-10-01

    In July of 1991, the Nuclear Regulatory Commission published a Final Rule in the Federal Register amending regulations governing medical therapeutic administrations of byproduct material and certain uses of radioactive sodium iodide. These amendments required implementation of a Quality Management Program (QMP) to provide high confidence that the byproduct material -- or radiation from byproduct material -- will be administered as directed by an authorized user physician. Herein, this rule is referred to as the QM rule. The Final Rule was published after two proposed rules had been published in the Federal Register.

  10. Title IX: With New Opportunities, Girls' Interest Rises

    Science.gov (United States)

    Toporek, Bryan

    2012-01-01

    On June 23, 1972, President Richard M. Nixon signed into law Title IX of the Education Amendments of 1972, which prohibits gender discrimination in any federally financed education program or activity. Title IX is far-reaching, but the law is most often associated with school and college athletics. Title IX allows schools to prove their athletic…

  11. Exploring New Directions: Title I in the Year 2000.

    Science.gov (United States)

    Puma, Michael J.; Drury, Darrel W.

    This report takes stock of the present Title I program, identifies the most promising approaches to educating the nation's disadvantaged children, and offers guidance to policymakers seeking to improve Title I's effectiveness. The report draws upon hundreds of studies, evaluations, and other documents, and details the evolution of the Title I…

  12. ISTC: experimental and technology programs toward novel reactor concepts (review of the ISTC projects and programs)

    Energy Technology Data Exchange (ETDEWEB)

    Tocheny, L.V. [ISTC - International Science and Technology Center, Moscow, Russia, Moscow (Russian Federation)

    2007-07-01

    The ISTC (International Science and Technology Center) is a unique international organization created in Moscow more than twelve years ago by Russia, Usa, E.U. and Japan. Later Korea and Canada, and several CIS countries as well acceded to ISTC. The basic idea behind establishing the ISTC was to support non-proliferation of the mass destruction weapons technologies by re-directing former Soviet weapons scientists to peaceful research thus preventing the drain of dangerous knowledge and expertise from Russia and other CIS countries. Numerous science and technology projects were realized with the ISTC support in different areas, from bio-technologies and environmental problems to all aspects of nuclear studies, including those focused on the development of effective innovative concepts and technologies in the nuclear field, in general, and for improvement of nuclear safety, in particular. The presentation addresses some technical results of the ISTC projects as well as methods and approaches employed by the ISTC to foster close international collaboration and manage projects towards fruitful results. Goals of this presentation are to introduce some of the ISTC programs to international nuclear community to give examples of international cooperation, created in the frames of ISTC, to illustrate the statement of importance of international nuclear experiment as a tool for evidence of new nuclear concepts acceptance, and to make a call for further joint collaboration. (author)

  13. ISTC: experimental and technology programs toward novel reactor concepts (review of the ISTC projects and programs)

    International Nuclear Information System (INIS)

    Tocheny, L.V.

    2007-01-01

    The ISTC (International Science and Technology Center) is a unique international organization created in Moscow more than twelve years ago by Russia, Usa, E.U. and Japan. Later Korea and Canada, and several CIS countries as well acceded to ISTC. The basic idea behind establishing the ISTC was to support non-proliferation of the mass destruction weapons technologies by re-directing former Soviet weapons scientists to peaceful research thus preventing the drain of dangerous knowledge and expertise from Russia and other CIS countries. Numerous science and technology projects were realized with the ISTC support in different areas, from bio-technologies and environmental problems to all aspects of nuclear studies, including those focused on the development of effective innovative concepts and technologies in the nuclear field, in general, and for improvement of nuclear safety, in particular. The presentation addresses some technical results of the ISTC projects as well as methods and approaches employed by the ISTC to foster close international collaboration and manage projects towards fruitful results. Goals of this presentation are to introduce some of the ISTC programs to international nuclear community to give examples of international cooperation, created in the frames of ISTC, to illustrate the statement of importance of international nuclear experiment as a tool for evidence of new nuclear concepts acceptance, and to make a call for further joint collaboration. (author)

  14. Project of program law relative to the implementation of the 'Grenelle de l'environnement' program

    International Nuclear Information System (INIS)

    2008-01-01

    The 'Grenelle de l'environnement' is a sustainable development program launched by the French government and which involves together the government and representatives of the civil society in order to elaborate an action plan with concrete measures in favor of the environment. The program is based on four steps. The first step is the creation of six working groups aiming at taking up the following challenges: fighting against climate change and controlling energy demand; preserving biodiversity and natural resources; establishing a healthy environment; adopting sustainable production and consumption practices (agriculture, fishing, food industry, forestry etc); building up an ecological democracy: institutions and governance; and promoting ecological development practices favorable to competitiveness and employment. The three other steps are: the consultation of public authorities, the negotiations between the government and representatives of the local authorities, of the non-governmental organisations, of the employers and of the employees, and finally, the implementation of commitments. This project of program law faithfully summarizes the commitments of the Grenelle, and precises and completes some of the choices according to the proposals of the operational committees. (J.S.)

  15. 75 FR 6354 - NOAA Great Lakes Habitat Restoration Program Project Grants under the Great Lakes Restoration...

    Science.gov (United States)

    2010-02-09

    ...-04] RIN 0648-ZC10 NOAA Great Lakes Habitat Restoration Program Project Grants under the Great Lakes... Atmospheric Administration (NOAA), Department of Commerce. ACTION: Notice of funding availability; Date... on January 19, 2010. That notice announced the NOAA Great Lakes Habitat Restoration Program Project...

  16. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1995 quality program status report

    Energy Technology Data Exchange (ETDEWEB)

    Bolivar, S.L.

    1996-07-01

    This status report summarizes the activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project`s (YMP`s) quality assurance program for January 1 to September 30, 1995. The report includes major sections on program activities and trend analysis.

  17. Implementing a Project-Based Learning Model in a Pre-Service Leadership Program

    Science.gov (United States)

    Albritton, Shelly; Stacks, Jamie

    2016-01-01

    This paper describes two instructors' efforts to more authentically engage students in a preservice leadership program's course called Program Planning and Evaluation by using a project-based learning approach. Markham, Larmer, and Ravitz (2003) describe project-based learning (PjBL) as "a systematic teaching method that engages students in…

  18. Multi-Function Waste Tank Facility Quality Assurance Program Plan, Project W-236A. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Hall, L.R.

    1995-05-30

    This document describes the Quality Assurance (QA) program for the Multi-Function Waste Tank Facility (MWTF) Project. The purpose of this QA program is to control project activities in such a manner as to achieve the mission of the MWTF Project in a safe and reliable manner. The QA program for the MWTF Project is founded on DOE Order 5700.6C, Quality Assurance, and implemented through the use of ASME NQA-1, Quality Assurance Program Requirements for Nuclear Facilities (ASME 1989 with addenda la-1989, lb-1991 and lc-1992). This document describes the program and planned actions which the Westinghouse Hanford Company (WHC) will implement to demonstrate and ensure that the project meets the requirements of DOE Order 5700.6C through the interpretive guidance of ASME NQA-1.

  19. Multi-Function Waste Tank Facility Quality Assurance Program Plan, Project W-236A. Revision 2

    International Nuclear Information System (INIS)

    Hall, L.R.

    1995-01-01

    This document describes the Quality Assurance (QA) program for the Multi-Function Waste Tank Facility (MWTF) Project. The purpose of this QA program is to control project activities in such a manner as to achieve the mission of the MWTF Project in a safe and reliable manner. The QA program for the MWTF Project is founded on DOE Order 5700.6C, Quality Assurance, and implemented through the use of ASME NQA-1, Quality Assurance Program Requirements for Nuclear Facilities (ASME 1989 with addenda la-1989, lb-1991 and lc-1992). This document describes the program and planned actions which the Westinghouse Hanford Company (WHC) will implement to demonstrate and ensure that the project meets the requirements of DOE Order 5700.6C through the interpretive guidance of ASME NQA-1

  20. South Carolina: Charleston County Area Project Impact Environmental Education Program (A Former EPA CARE Project)

    Science.gov (United States)

    The Charleston County Area Project Impact is the recipient of a Level II CARE cooperative agreement. The project is under the direction of the Charleston County Building Services Department, in Charleston, S.C.

  1. Linear-programming-based heuristics for project capacity planning

    NARCIS (Netherlands)

    Gademann, A.J.R.M.; Schutten, J.M.J.

    2005-01-01

    Many multi-project organizations are capacity driven, which means that their operations are constrained by various scarce resources. An important planning aspect in a capacity driven multi-project organization is capacity planning. By capacity planning, we mean the problem of matching demand for

  2. Homeless Education Project 1996-97. Scope of Program.

    Science.gov (United States)

    West Contra Costa Unified School District, CA.

    The documents in this collection relate to the Homeless Education Project conducted in the elementary and secondary schools of the West Contra Costa Unified School District (California). The first document is a chart describing the project and its main goals: (1) an accelerated curriculum in reading and mathematics; (2) effective procedures for…

  3. Spent nuclear fuel project quality assurance program plan

    International Nuclear Information System (INIS)

    Lacey, R.E.

    1997-01-01

    This main body of this document describes how the requirements of 10 CFR 830.120 are met by the Spent Nuclear Fuel Project through implementation of WHC-SP-1131. Appendix A describes how the requirements of DOE/RW-0333P are met by the Spent Nuclear Fuel Project through implementation of specific policies, manuals, and procedures

  4. Browse Title Index

    African Journals Online (AJOL)

    Items 151 - 200 of 229 ... Browse Title Index ... Issue, Title. Vol 14, No 2 ... Vol 15, No 1 (2017), Qualitative and quantitative methods of suicide research in old age, Abstract PDF ... Vol 11, No 2 (2013), Simple Algorithm in the Management of Fetal ...

  5. Browse Title Index

    African Journals Online (AJOL)

    Items 201 - 250 of 488 ... African Journal of Paediatric Surgery. ... Ileocecal valve atresia: Introduction of a new surgical approach ... Vol 4, No 1 (2007), Isolated Bilateral Macrostomia: Case Series and ... Vol 9, No 2 (2012), Laparoscopic inguinal hernia repair in ... List All Titles · Free To Read Titles This Journal is Open Access.

  6. Browse Title Index

    African Journals Online (AJOL)

    Items 601 - 650 of 788 ... Browse Title Index ... Issue, Title ... Vol 14, No 1 (2006), Social science research: a critique of quantitative and qualitative methods ... Vol 18, No 1 (2010), Stress among part-time business students: a study in a Ghanaian ...

  7. Title to mining properties

    International Nuclear Information System (INIS)

    Crouch, K.M.

    1976-01-01

    The requirements of the law which must be met in order to create title to an unpatented mining claim and the procedures which should be followed when an attempt is made to determine the title to the claim is acceptable are reviewed

  8. Quality Assurance Program Plan for Project W-379: Spent Nuclear Fuels Canister Storage Building Projec

    International Nuclear Information System (INIS)

    Duncan, D.W.

    1995-01-01

    This document describes the Quality Assurance Program Plan (QAPP) for the Spent Nuclear Fuels (SNF) Canister Storage Building (CSB) Project. The purpose of this QAPP is to control project activities ensuring achievement of the project mission in a safe, consistent and reliable manner

  9. Research-Informed Curriculum Design for a Master's-Level Program in Project Management

    Science.gov (United States)

    Bentley, Yongmei; Richardson, Diane; Duan, Yanqing; Philpott, Elly; Ong, Vincent; Owen, David

    2013-01-01

    This article reports on the application of Research-Informed Curriculum Design (RICD) for the development and implementation of an MSc Program in Project Management. The research focused on contemporary issues in project management and provided an analysis of project management approaches, tools, and techniques currently used in organizations.…

  10. Federal Programs Supporting Educational Change, Vol. VII: Factors Affecting Implementation and Continuation.

    Science.gov (United States)

    Berman, Paul; And Others

    This report is one of three volumes that describe the second phase of a study that examined the implementation of four federal change agent programs related to education. Phase 2 of the study focused on what happens to local projects in the two largest change agent programs--ESEA Title III and ESEA Title VII--when federal funding stops. This…

  11. Summary results of an assessment of research projects in the Nuclear Medicine Research program

    International Nuclear Information System (INIS)

    1988-01-01

    In May 1987, OHER management requested the Office of Program Analysis (OPA) to conduct a peer review of the projects of the DOE Nuclear Medicine Research program. This was done using procedures and a quantitative methodology OPA developed for assessing DOE research programs. Sixty-three individual nuclear medicine projects were reviewed by seven panels; one panel on isotopes and radioisotopes, three on radiopharmacology, two on clinical feasibility, and one on instrumentation. Each panel consisted of five to ten knowledgeable reviewers. 5 figs

  12. Subjective Outcome Evaluation of the Project P.A.T.H.S. (Secondary 2 Program: Views of the Program Participants

    Directory of Open Access Journals (Sweden)

    Daniel T. L. Shek

    2009-01-01

    Full Text Available A total of 196 secondary schools participated in the Secondary 2 Program of the Full Implementation Phase of the Project P.A.T.H.S. (Positive Adolescent Training through Holistic Social Programmes. After completion of the Tier 1 Program, 30,731 students responded to the Subjective Outcome Evaluation Form (Form A to assess their perceptions of the program, instructors, and perceived effectiveness of the program. Based on the consolidated reports submitted by the schools to the funding body, the research team aggregated the consolidated data to form a “reconstructed” overall profile on the perceptions of the program participants. Findings demonstrated that high proportions of the respondents had positive perceptions of the program and the instructors, and roughly four-fifths of the respondents regarded the program as beneficial to them. Correlation analyses showed that perceived program and instructor characteristics were positively associated with perceived benefits of the program.

  13. Goal Attainment Scaling: A Primary Method of Treatment and Program Evaluation in Project SAIL - A Special Education Dropout Prevention Program.

    Science.gov (United States)

    Harris, Linda Hall; Thompson, John L.

    The manual discusses Project SAIL's (a special dropout prevention program) use of Goal Attainment Scaling as part of individualized education plans in the treatment of troubled adolescents and in overall program evaluation. The scaling is characterized as an explicit, respectful treatment contact through which the adolescent can learn to set…

  14. Academy of Program/Project & Engineering Leadership: APPEL Case Studies

    Data.gov (United States)

    National Aeronautics and Space Administration — Case studies illustrate the kinds of decisions and dilemmas managers face every day, and as such provide an effective learning tool for project management. Due to...

  15. Academy of Program/Project & Engineering Leadership: Interactive Case Studies

    Data.gov (United States)

    National Aeronautics and Space Administration — Case studies illustrate the kinds of decisions and dilemmas managers face every day, and as such provide an effective learning tool for project management. Due to...

  16. 7 CFR 1209.40 - Programs, plans, and projects.

    Science.gov (United States)

    2010-01-01

    ..., plan, or project, no reference to a brand name, trade name, or State or regional identification of any... SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE MUSHROOM...

  17. Sanchez and Metz Elementary Schools: Dos Idiomas, Un Mundo. Dual Language Project. Title VII First-Year Evaluation Report, 1995-96.

    Science.gov (United States)

    Ernest, Harishini M.; Gonzalez, Rosa Maria

    The first-year evaluation of a two-way Spanish/English bilingual education program at two Austin (Texas) elementary schools is presented. The developmental program has as its objectives the development of students' oral proficiency in Spanish and English, development of grade-level appropriate literacy in both languages, increase in academic…

  18. 5 CFR 470.313 - Project implementation regulations.

    Science.gov (United States)

    2010-01-01

    ... project must be approved by OPM and shall have full force and authority pursuant to Title VI of the Civil... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Project implementation regulations. 470... PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to...

  19. State Energy Program Results: More Projects That Work

    Energy Technology Data Exchange (ETDEWEB)

    1998-12-01

    A Summary of Success stories of the State Energy Programs. The goal of the State Energy Program is to strengthen the capabilities of States to promote energy efficiency and to adopt renewable energy technologies, thereby helping the nation save energy and realize a stronger economy, cleaner environment, and a more secure future.

  20. Uranium Holdup Survey Program (UHSP) Lean Improvement Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Jeff [Y-12 National Security Complex, Oak Ridge, TN (United States); Univ. of Tennessee, Knoxville, TN (United States)

    2017-10-13

    This report discusses the UHSP monitoring program, a radioactive material accounting process and its purpose. The systematic approach to implementing Lean principles, determining key requirements, root causes of variation and disruption that interfere with program efficiency and effectiveness. Preexisting issues within the UHSP are modeled to illustrate the impact that they have on the large and extensive systems.

  1. Collaboration, Pedagogy, and Media: Short-Term Summer Programs Emphasize Project Based and Social Emotional Learning

    Science.gov (United States)

    Bowden, William R.

    2015-01-01

    Summer programs that experiment with combining media literacy and social-emotional learning can potentially affect students' academic performance. Based on a six-week program, working with rising eighth grade students in a low-income school district, this program allowed students to work on media projects while trying to develop stronger…

  2. The Hemingway Project: A Collaborative School-based Program for Teacher Certification.

    Science.gov (United States)

    Butler, Shannon K.; And Others

    At Weber State University (Utah), teacher educators have collaborated with English faculty to design a pilot program (Hemingway Project) which serves as an initial effort to restructure the teacher education program. The program, funded by the Hemingway Foundation, is intended to provide greater integration of the university experience with actual…

  3. The terrestrial ecosystem program for the Yucca Mountain Project

    International Nuclear Information System (INIS)

    Ostler, W.K.; O'Farrell, T.P.

    1994-01-01

    DOE has implemented a program to monitor and mitigate impacts associated with site Characterization Activities at Yucca Mountain on the environment. This program has a sound experimental and statistical base. Monitoring data has been collected for parts of the program since 1989. There have been numerous changes in the Terrestrial Ecosystems Program since 1989 that reflect changes in the design and locations of Site Characterization Activities. There have also been changes made in the mitigation techniques implemented to protect important environmental resources based on results from the research efforts at Yucca Mountain. These changes have strengthened DOE efforts to ensure protection of the environmental during Site Characterization. DOE,has developed and implemented an integrated environmental program that protects the biotic environment and will restore environmental quality at Yucca Mountain

  4. CDIO Projects in DTU’s Chemical and Biochemical B.Eng. Study Program

    DEFF Research Database (Denmark)

    Clement, Karsten; Harris, Pernille; Agersø, Yvonne

    2011-01-01

    The aim of this paper is to describe how the CDIO standards [1] have influenced the cross-disciplinary projects that are part of the study plan for the Chemical and Biochemical B.Eng. program. Four projects are described: The 1st semester design-build project on cleaning of waste water from a power...... plant, the 2nd semester laboratory project concerning antimicrobial resistant E. coli bacteria in retail meats, the 3rd semester project on unit operations in enzyme production, the 4th semester project on the fermentation and purification part of enzyme production....

  5. The development of the Waste Isolation Pilot Plant (WIPP) project's public affairs program

    International Nuclear Information System (INIS)

    Walter, L.H.

    1988-01-01

    The Waste Isolation Pilot Plant (WIPP) offers a perspective on the value of designing flexibility into a public affairs program to enable it to grow with and complement a project's evolution from construction through to operations. This paper discusses how the WIPP public affairs program progressed through several stages to its present scope. During the WIPP construction phase, the public affairs program laid a foundation for Project acceptance in the community. A speaker's bureau, a visitors program, and various community outreach and support programs emphasized the educational and socioeconomic benefits of having this controversial project in Carlsbad. Then, in this past year as the project entered a preoperational status, the public affairs program emphasis shifted to broaden the positive image that had been created locally. In this stage, the program promoted the project's positive elements with the various state agencies, government officials, and federal organizations involved in our country's radioactive waste management and transportation program. Currently, an even broader, more aggressive public affairs program is planned. During this stage public affairs will be engaged in a comprehensive institutional and outreach program, explaining and supporting WIPP's mission in each of the communities and agencies affected by the operation of the country's first geologic repository

  6. Closeout of the award DE-FG02-05ER46223. Trustees of the University of Pennsylvania. Project title- "Modular Designed Protein Constructions for Solar Generated H2 From Water

    Energy Technology Data Exchange (ETDEWEB)

    Dutton, P. Leslie [Univ. of Pennsylvania, Philadelphia, PA (United States)

    2015-02-18

    As the title of the grant clearly states, this project has explores a unique way that makes use of manmade proteins to turn solar energy into chemical fuels. A major impetus to the work is that there is growing support for the view that two related forces will impact on future livability of Earth. The first is the finite supply of fossil fuels to power the Earth making it prudent to save this resource for the creation of useful chemicals. The second is that burning fossil fuels to generate power releases “greenhouse” gases into the atmosphere. There is mounting evidence that this is a major contribution to the warming trend in the Earth’s atmosphere and biosphere.

  7. Coastal Mapping Program Project TX1406: FREEPORT, TX.

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The objective of the Coastal Mapping Program (CMP) is to provide surveying and mapping information of our nation's coastline. This shoreline mapping effort also...

  8. Coastal Mapping Program Project OR1401; SOUTH SLOUGH NERR, OR.

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The objective of the Coastal Mapping Program (CMP) is to provide surveying and mapping information of our nation's coastline. This shoreline mapping effort also...

  9. Coastal Mapping Program Project MN1501: SILVER BAY, MN.

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The objective of the Coastal Mapping Program (CMP) is to provide surveying and mapping information of our nation's coastline. This shoreline mapping effort also...

  10. Fermilab advanced computer program multi-microprocessor project

    International Nuclear Information System (INIS)

    Nash, T.; Areti, H.; Biel, J.

    1985-06-01

    Fermilab's Advanced Computer Program is constructing a powerful 128 node multi-microprocessor system for data analysis in high-energy physics. The system will use commercial 32-bit microprocessors programmed in Fortran-77. Extensive software supports easy migration of user applications from a uniprocessor environment to the multiprocessor and provides sophisticated program development, debugging, and error handling and recovery tools. This system is designed to be readily copied, providing computing cost effectiveness of below $2200 per VAX 11/780 equivalent. The low cost, commercial availability, compatibility with off-line analysis programs, and high data bandwidths (up to 160 MByte/sec) make the system an ideal choice for applications to on-line triggers as well as an offline data processor

  11. Coastal Mapping Program Project MI1501: ST CLAIR, MI.

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The objective of the Coastal Mapping Program (CMP) is to provide surveying and mapping information of our nation's coastline. This shoreline mapping effort also...

  12. CDIO Projects in DTU’s B.Eng. in IT Study Program

    DEFF Research Database (Denmark)

    Sparsø, Jens; Bolander, Thomas; Fischer, Paul

    2011-01-01

    Since the fall 2008 all B.Eng. study programs at the Technical University of Denmark have been based on the CDIO concept. The adoption of the CDIO standards and principles resulted in new or significantly revised study programs. As part of this effort design-build projects have been introduced...... on each of the first 4 semesters, and each semester-project spans several courses. The aim of this paper is to describe the four CDIO semester projects in the B.Eng. in IT study, and – along with similar papers describing the other six B.Eng. programs – to provide documentation to accompany an exposition...

  13. Digitizing geographic data with GRIDOT; a generalized program for drawing overlay grids in various map projections

    International Nuclear Information System (INIS)

    Edwards, R.G.; Durfee, R.C.

    1976-09-01

    The GRIDOT computer program draws overlay grids on a Calcomp plotter for use in digitizing information from maps, rectified aerial photographs, and other sources of spatially distributed data related to regional environmental problems. The options of the program facilitate use of the overlays with standard maps and map projections of the continental United States. The overlay grid may be defined as a latitude-longitude grid (geodetic grid), a Universal Transverse Mercator Grid, or one of the standard state-plane coordinate system grids. The map for which the overlay is intended may be in an Albers Equal Area projection, a Lambert Conformal projection, a Polyconic projection, a Transverse Mercator projection, a Universal Transverse Mercator projection, or any of the standard state-plane projections

  14. Browse Title Index

    African Journals Online (AJOL)

    1986), University Engineering Education and Training in Nigeria: Development, ... Vol 29, No 1 (2010), Use of Energy Method to Simulate the ... of Optimal Rational Composition of Titles Producible from Nigerian Clays ...

  15. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 50 of 194 ... Journal Home > Advanced Search > Browse Title Index ... Vol 14, No 1 (2000), A functional categoriality of adjectives in ... Vol 1, No 1 (1987), Alienation and affirmation: The humanistic vision of Bessie Head, Abstract PDF.

  16. Browse Title Index

    African Journals Online (AJOL)

    Items 151 - 200 of 879 ... South African Journal of Higher Education. ... Browse Title Index ... in a USA school setting: Merging transition theory with a narrative approach, Abstract ... Citation analysis of theses and dissertations submitted at the ...

  17. Browse Title Index

    African Journals Online (AJOL)

    Items 601 - 650 of 879 ... South African Journal of Higher Education. ... Browse Title Index .... The challenge of thesis supervision in an art university, Abstract ... No 2 (2004), Robert Sternberg's mental self-government theory and its contribution to ...

  18. Browse Title Index

    African Journals Online (AJOL)

    Items 101 - 150 of 533 ... Southern African Linguistics and Applied Language Studies. ... Issue, Title ... Vol 34, No 1 (2016), Book Review: Qualitative-Quantitative Analyses of .... The complex consonants of simple CV-syllables in Zezuru, Abstract.

  19. Browse Title Index

    African Journals Online (AJOL)

    Items 51 - 100 of 346 ... Journal Home > Advanced Search > Browse Title Index ... and hygiene promotion services in Rungwe district, Tanzania, Abstract .... as seen in NIgerian teaching hospital: pattern and a simple classification, Abstract.

  20. Browse Title Index

    African Journals Online (AJOL)

    Items 151 - 200 of 437 ... Journal Home > Advanced Search > Browse Title Index ... prospects and realistic strategies to its implementation in Nigeria\\'s Institute of ... and Communication Technology (ICT) in information dissemination, Abstract.

  1. Browse Title Index

    African Journals Online (AJOL)

    Items 901 - 950 of 1355 ... Journal of Applied Sciences and Environmental Management. ... Journal Home > Advanced Search > Browse Title Index .... Vol 22, No 2 (2018), Performance evaluation of a locally fabricated sawdust fired oven for ...

  2. Browse Title Index

    African Journals Online (AJOL)

    Items 301 - 350 of 788 ... Journal Home > Advanced Search > Browse Title Index ... Vol 26, No 1 (2018), Gender differentials in the perception of .... Vol 25, No 1 (2017), Impact of total quality management on students' academic performance in ...

  3. Browse Title Index

    African Journals Online (AJOL)

    Items 101 - 150 of 465 ... Journal Home > Advanced Search > Browse Title Index ... and twinning data of an igbo kindred during the Nigerian Civil War, Abstract ... on laboratory estimations with special reference to clinical chemistry, Abstract.

  4. Browse Title Index

    African Journals Online (AJOL)

    Items 251 - 300 of 1260 ... Journal Home > Advanced Search > Browse Title Index ... Consumption of ammonia-nitrogen by aob in immobilized batch culture, Abstract PDF .... Vol 9, No 3S (2017): Special Issue, Design an automatic temperature ...

  5. Browse Title Index

    African Journals Online (AJOL)

    Items 101 - 150 of 294 ... Journal Home > Advanced Search > Browse Title Index. Log in or .... S Edwards, M Hlongwane, J Thwala, N Robinson ... Vol 16, No 1 (2017), Infancy of internet cafe: The substitute of ubuntu-padare pedagogy, Abstract.

  6. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 50 of 130 ... Journal Home > Advanced Search > Browse Title Index. Log in or ... using the technological pedagogical content knowledge(TPACK) framework, Abstract PDF ... Tamara N. Hrin, Dušica D. Milenković, Mirjana D. Segedinac.

  7. Browse Title Index

    African Journals Online (AJOL)

    Items 101 - 150 of 278 ... Journal Home > Advanced Search > Browse Title Index ... drie paradigmas beskou: 'n eenheid, of 'n veelheid van perspektiewe? ... Vol 45, No 1 (2011), Genre pedagogy in the mediation of socially-situated literacies ...

  8. Browse Title Index

    African Journals Online (AJOL)

    Items 551 - 600 of 879 ... Journal Home > Advanced Search > Browse Title Index ... A James, E Ralfe, L van Laren, N Ngcobo ... 1 (2011), Recognition of prior learning in promoting lifelong learning: A pedagogy of hope or a shattering of dreams?

  9. Browse Title Index

    African Journals Online (AJOL)

    Items 451 - 500 of 533 ... Journal Home > Advanced Search > Browse Title Index .... for past tense forms in Northern Sotho: verb stems with final 'm' and 'n', Abstract ... in an academic writing class: Implications for a dialogic pedagogy, Abstract.

  10. Browse Title Index

    African Journals Online (AJOL)

    Items 101 - 150 of 183 ... Journal Home > Advanced Search > Browse Title Index ... Vol 61 (2017), New interventions and sustainable solutions: .... Vol 35 (2011), Resurgence of tribal levies: Double taxation for the rural poor, Abstract PDF.

  11. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 50 of 736 ... Journal Home > Advanced Search > Browse Title Index ... Vol 5 (2008), A Contagious Malady: The Human Quest for Truth through Religion, Abstract ... A Study of Politeness Strategies Used by the National University of ...

  12. Browse Title Index

    African Journals Online (AJOL)

    Items 101 - 150 of 414 ... Journal Home > Advanced Search > Browse Title Index. Log in or ... of an algebraic function for the permutation of truth table columns, Abstract ... appraisal and productivity levels in selected Nigerian universities, Abstract.

  13. Browse Title Index

    African Journals Online (AJOL)

    Items 101 - 150 of 879 ... Journal Home > Advanced Search > Browse Title Index ... Vol 20, No 4 (2006), Assessing academic potential for university admission: ... Vol 16, No 2 (2002), Book Review: Rethinking truth by Higgs, P & Smith, J, Details.

  14. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 50 of 165 ... Journal Home > Advanced Search > Browse Title Index ... Vol 43 (2011), Assessment of the Learning Commons takeoff at the University of ... the archive of South Africa's Truth and Reconciliation Commission, Abstract.

  15. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 50 of 644 ... Journal Home > Advanced Search > Browse Title Index. Log in or ... Ethics review n international health research: quality assurance or bureaucratic nightmare? Details ... Audit of Management of Open Fractures, Details PDF.

  16. Browse Title Index

    African Journals Online (AJOL)

    Items 651 - 700 of 1199 ... Issue, Title ... Vol 5, No 1 (2011), Motivation, an Essential Ingredient for Optimal Performance in Emerging Markets, Abstract PDF ... Vol 3, No 5 (2009), Multinational transfer pricing and international taxation: what, why, ...

  17. Browse Title Index

    African Journals Online (AJOL)

    Items 51 - 100 of 153 ... Issue, Title. Vol 9, No 2 (2006):, Effects of efficient water utilisation on water resources development in Swaziland under climate change, Abstract .... Ethical, Indigenous and Socio-Economic Perspectives, Abstract.

  18. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 50 of 98 ... Journal Home > Advanced Search > Browse Title Index ... model for the continued professionalisation of student affairs in Africa, Abstract PDF ... Vol 2, No 2 (2014), Book Review: How College Affects Students, A Third decade ...

  19. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 50 of 76 ... Journal Home > Advanced Search > Browse Title Index ... Vol 4, No 1 (2011), Automation of AutoCAD for Detailing of Reinforced .... Vol 10, No 1 (2017), Housing data base for sustainable housing provision, Abstract PDF.

  20. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 50 of 147 ... Journal Home > Advanced Search > Browse Title Index .... Library (TEEAL) Database among faculty members in Federal University, ... Vol 5, No 2 (2014), Effects of corporate culture on the implementation of automation in ...

  1. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 41 of 41 ... Issue, Title ... Vol 1, No 3 (2004): Special Edition, Assessment of the quality and reserves of Bat ... Vol 1, No 1 (1997), Bovine dermatophilosis in Zambia: epidemiology, socio-economic impacts and future perspectives, Abstract.

  2. Browse Title Index

    African Journals Online (AJOL)

    Items 701 - 750 of 808 ... Issue, Title ... Vol 58, No 2 (2010), Short Communicaton: The socio-economic impact of helminth infections and the ... Vol 62 (2014): Special Edition, Special edition summarizing the scientific discourse which took place ...

  3. Browse Title Index

    African Journals Online (AJOL)

    Items 351 - 391 of 391 ... Issue, Title ... Vol 2, No 3 (1999): Special Edition, The efficacy of low volume application of roundup ... Vol 1, No 1 (1998), The relationships among National Socio-Economic Indicators and Child Health Statistics, Abstract.

  4. Browse Title Index

    African Journals Online (AJOL)

    Items 201 - 250 of 531 ... Journal Home > Advanced Search > Browse Title Index ... thermal conductivity and viscosity in a flat plate solar collector, Abstract PDF .... similarity method in unsteady two-dimensional MHD boundary layer on the body ...

  5. Reading in 3 Languages. La lectura en 3 idiomas. La lecture en langues. Manual Prepared for the Bilingual Demonstration Project, Title VII.

    Science.gov (United States)

    New York City Board of Education, Brooklyn, NY. Office of Bilingual Education.

    The manual contains forms, handouts, checklists, and other materials used in and developed by the Bilingual Screening and Reading Clinic Demonstration Project of New York City's Community School District 3. The materials are provided for teachers and administrators to use or modify for working with bilingual school populations in need of…

  6. The Maine Garlic Project: A Participatory Research and Education Program

    Science.gov (United States)

    Fuller, David; Johnson, Steven B.

    2013-01-01

    Participatory research is a useful technique for collecting basic data over a large geographic area. Garlic production was chosen as a participatory research study focus in Maine. Project participants (285) received bulbs to plant, monitored their crop, and reported data online. Participants received a monthly educational newsletter to improve…

  7. 78 FR 53712 - Surface Transportation Project Delivery Program Application Requirements

    Science.gov (United States)

    2013-08-30

    ... application, and discussion of classes of multimodal projects that may be best handled on a case-by-case basis... submissions; a paragraph discussing the joint application process; and a paragraph authorizing the Agencies to... early enough to allow for a joint application of the Secretary's responsibilities before the...

  8. The Eurodif program. Present status of the project

    International Nuclear Information System (INIS)

    Besse, G.

    1975-01-01

    The reasons which led Eurodif to decide for the gaseous diffusion process and the benefits which such process offers for the present time are presented. The realization of the Eurodif project (description of the plant, time schedule of the realization, electric power supply, production time-schedule) is discussed. The Eurodif marketing policy, present and future, is reported [fr

  9. ECUT (Energy Conversion and Utilization Technologies) program: Biocatalysis project

    Science.gov (United States)

    Baresi, Larry

    1989-03-01

    The Annual Report presents the fiscal year (FY) 1988 research activities and accomplishments, for the Biocatalysis Project of the U.S. Department of Energy, Energy Conversion and Utilization Technologies (ECUT) Division. The ECUT Biocatalysis Project is managed by the Jet Propulsion Laboratory, California Institute of Technology. The Biocatalysis Project is a mission-oriented, applied research and exploratory development activity directed toward resolution of the major generic technical barriers that impede the development of biologically catalyzed commercial chemical production. The approach toward achieving project objectives involves an integrated participation of universities, industrial companies and government research laboratories. The Project's technical activities were organized into three work elements: (1) The Molecular Modeling and Applied Genetics work element includes research on modeling of biological systems, developing rigorous methods for the prediction of three-dimensional (tertiary) protein structure from the amino acid sequence (primary structure) for designing new biocatalysis, defining kinetic models of biocatalyst reactivity, and developing genetically engineered solutions to the generic technical barriers that preclude widespread application of biocatalysis. (2) The Bioprocess Engineering work element supports efforts in novel bioreactor concepts that are likely to lead to substantially higher levels of reactor productivity, product yields and lower separation energetics. Results of work within this work element will be used to establish the technical feasibility of critical bioprocess monitoring and control subsystems. (3) The Bioprocess Design and Assessment work element attempts to develop procedures (via user-friendly computer software) for assessing the energy-economics of biocatalyzed chemical production processes, and initiation of technology transfer for advanced bioprocesses.

  10. Steam-Generator Integrity Program/Steam-Generator Group Project

    International Nuclear Information System (INIS)

    1982-10-01

    The Steam Generator Integrity Program (SGIP) is a comprehensive effort addressing issues of nondestructive test (NDT) reliability, inservice inspection (ISI) requirements, and tube plugging criteria for PWR steam generators. In addition, the program has interactive research tasks relating primary side decontamination, secondary side cleaning, and proposed repair techniques to nondestructive inspectability and primary system integrity. The program has acquired a service degraded PWR steam generator for research purposes. This past year a research facility, the Steam Generator Examination Facility (SGEF), specifically designed for nondestructive and destructive examination tasks of the SGIP was completed. The Surry generator previously transported to the Hanford Reservation was then inserted into the SGEF. Nondestructive characterization of the generator from both primary and secondary sides has been initiated. Decontamination of the channelhead cold leg side was conducted. Radioactive field maps were established in the steam generator, at the generator surface and in the SGEF

  11. Pollution prevention program for new projects -- Lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Lum, J. [Dept. of Energy, Washington, DC (United States)

    1993-03-01

    The purpose of this presentation is to relay the experience of the Office of New Production Reactors (NP) in developing and implementing its pollution prevention program. NP was established to plan, design, and construct a new safe and environmentally acceptable nuclear reactor capacity necessary to provide an assured supply of tritium to maintain the nation`s long-term deterrent capability. The Program offered the Department of Energy an opportunity to demonstrate its commitment to environmental protection via minimization of environmental releases; new design offers the best opportunity for pollution prevention. The NP pollution prevention program was never fully implemented because NP`s tritium production design activity was recovery terminated. The information in this paper represented lessons learned from the last three years of NP operation.

  12. Quality Assurance Program Plan for the radiological survey activities program --- Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Knott, R.R.; Little, C.A.

    1991-08-01

    The Pollutant Assessments Group (PAG) at the Grand Junction Office (GJO), Colorado, of Oak Ridge National Laboratory (ORNL) is responsible for surveying designated sites in the vicinity of 24 inactive mill sites involved in the Department of Energy's (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP). The purpose of these surveys is to provide a recommendation to DOE whether to include or exclude these sites from UMTRAP based on whether the on-site residual radioactive material (if any) originated from the former mill sites, and radiation levels on-site are in excess of appropriate Environmental Protection Agency (EPA) criteria. This report describes the Quality Assurance Plan (QAP) for the PAG in conducting all activities related to UMTRAP. All quality assurance provisions given by the DOE, DOE/UMTRA and ORNL organizations are integrated into this plan. Specifically, this report identifies the policies and procedures followed in accomplishing the PAG/UMTRA QA program, identifies those organizational units involved in the implementation of these procedures, and outlines the respective responsibilities of those groups. 11 refs., 6 figs., 3 tabs

  13. Academy of Program/Project & Engineering Leadership: Shared Voyage: Learning and Unlearning from Remarkable Projects

    Data.gov (United States)

    National Aeronautics and Space Administration — Shared Voyage is about four remarkable projects:the Advanced Composition Explorer (NASA), the Joint Air-to-Surface Standoff Missile (U.S. Air Force), the Pathfinder...

  14. Laboratory Directed Research and Development Program FY2016 Annual Summary of Completed Projects

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2017-03-30

    ORNL FY 2016 Annual Summary of Laboratory Directed Research and Development Program (LDRD) Completed Projects. The Laboratory Directed Research and Development (LDRD) program at ORNL operates under the authority of DOE Order 413.2C, “Laboratory Directed Research and Development” (October 22, 2015), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. The LDRD program funds are obtained through a charge to all Laboratory programs. ORNL reports its status to DOE in March of each year.

  15. Land Acquisition and Relocation Assistance for Airport Improvement Program (AIP) Assisted Projects

    Science.gov (United States)

    2017-07-10

    This advisory circular (AC) provides guidance to sponsors of airport projects developed under the Airport Improvement Program (AIP) to meet the requirements of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (Pl 9...

  16. West Virginia Peer Exchange : Streamlining Highway Safety Improvement Program Project Delivery - An RSPCB Peer Exchange

    Science.gov (United States)

    2014-09-01

    The West Virginia Division of Highways (WV DOH) hosted a Peer Exchange to share information and experiences for streamlining Highway Safety Improvement Program (HSIP) project delivery. The event was held September 23 to 24, 2014 in Charleston, West V...

  17. 77 FR 33729 - Disability and Rehabilitation Research Projects and Centers Program-National Data and Statistical...

    Science.gov (United States)

    2012-06-07

    ... inclusion and integration of individuals with disabilities into society, and promote the employment... DEPARTMENT OF EDUCATION Disability and Rehabilitation Research Projects and Centers Program.... Final priority; National Institute on Disability and Rehabilitation Research (NIDRR)--Disability and...

  18. The projects of skunk works 75 years of Lockheed Martin's advanced development programs

    CERN Document Server

    Pace, Steve

    2016-01-01

    The Projects of Skunk Works examines 75 years of Lockheed Martin's advanced development programs, from jet fighters to missiles, heavy-lift helicopters, a lighter-than-air ship, drones, and a stealth boat.

  19. Quality assurance program plan for FRG sealed isotopic heat sources project (C-229)

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This QAPP implements the Quality Assurance Program Plan for the FRG Sealed Isotopic Heat Sources Project (C-229). The heat source will be relocated from the 324 Building and placed in interim storage at the Central Waste Complex (CWC)

  20. Academy of Program/Project & Engineering Leadership Orbital Debris Management and Risk Mitigation

    Data.gov (United States)

    National Aeronautics and Space Administration — The NASA Academy of Program/Project & Engineering Leadership (APPEL) is excited to announce the public release of Orbital Debris Management and Risk Mitigation,...

  1. The evolution of the Waste Isolation Pilot Plant (WIPP) project's public affairs program

    International Nuclear Information System (INIS)

    Walter, L.H.

    1988-01-01

    As a first-of-a-kind facility, the Waste Isolation Pilot Plant (WIPP) presents a unique perspective on the value of designing a public affairs program that grown with and complements a project's evolution from construction to operations. Like the project itself, the public affairs programs progressed through several stages to its present scope. During the construction phase, foundations were laid in the community. Then, in this past year as the project entered a preoperational status, emphasis shifted to broaden the positive image that had been created locally. In this stage, public affairs presented the project's positive elements to the various state agencies, government officials, and federal organizations involved in our country's radioactive waste management program. Most recently, and continuing until receipt of the first shipment of waste in October 1988, an even broader, more aggressive public affairs program is planned

  2. West Virginia peer exchange : streamlining highway safety improvement program project delivery.

    Science.gov (United States)

    2015-01-01

    The West Virginia Division of Highways (WV DOH) hosted a Peer Exchange to share information and experiences : for streamlining Highway Safety Improvement Program (HSIP) project delivery. The event was held September : 22 to 23, 2014 in Charleston, We...

  3. System Safety Program Plan for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boos, K.A.

    1996-01-01

    This System Safety Program Plan (SSPP) outlines the safety analysis strategy for project W-314, ''Tank Farm Restoration and Safe Operations.'' Project W-314 will provide capital improvements to Hanford's existing Tank Farm facilities, with particular emphasis on infrastructure systems supporting safe operation of the double-shell activities related to the project's conceptual Design Phase, but is planned to be updated and maintained as a ''living document'' throughout the life of the project to reflect the current safety analysis planning for the Tank Farm Restoration and Safe Operations upgrades. This approved W-314 SSPP provides the basis for preparation/approval of all safety analysis documentation needed to support the project

  4. The reclamation program for the Yucca Mountain Project

    International Nuclear Information System (INIS)

    Ostler, W.K.; O'Farrell, T.P.; Winkel, V.K.; Schultz, B.W.

    1991-01-01

    The US Department of Energy (DOE) is required by law and other regulatory requirements to reclaim disturbances created by site characterization activities at Yucca Mountain. Because of the difficulty of reclaiming arid areas and the lack of site specific information on successful reclamation techniques and procedures, the DOE has developed a comprehensive reclamation program. The program consists of three phases: planning, operational and research. The planning phase is a continuing process that ensures that program policy, goals, tasks and responsibilities are clearly identified and linked. The operational phase uses best available knowledge to develop and implement reclamation plans that are site-specific for each disturbance. Reclamation activities start prior to any surface disturbance with a survey of each disturbance by trained scientists. The scientists survey the area for the presence of protected species or critical wildlife habitat. They also gather vegetation, landscape, soils and other environmental data that is used to assess the impact of the proposed disturbance. Recommendations can be made to either avoid areas or mitigate impacts. The operational phase includes interim reclamation to protect valuable resources and control erosion prior to final reclamation. Monitoring of reclaimed sites is conducted to correct problem areas and insure that reclamation objectives are achieved. The third phase of the reclamation program is designed to provide site-specific information on effective reclamation techniques through research and field demonstrations. 52 refs., 1 tab

  5. A Mental Health Consultation Program for Project Head Start.

    Science.gov (United States)

    Kawin, Marjorie R.

    The Psychological Center provided a family oriented mental health consultation service to 17 delegate agencies who had contracts with Head Start programs in 1966-67. This paper presents an overview of the services which an interdisciplinary staff of 52 professionals provided to 6,780 families and 1,500 agency staff members. Gerald Caplan's (1964)…

  6. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1994 quality program status report

    Energy Technology Data Exchange (ETDEWEB)

    Bolivar, S.L.

    1996-03-01

    This status report is for calendar year 1994. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, a baseline is established that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify adverse trends and to evaluate improvements. This is the fourth annual status report.

  7. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1994 quality program status report

    International Nuclear Information System (INIS)

    Bolivar, S.L.

    1996-03-01

    This status report is for calendar year 1994. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, a baseline is established that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify adverse trends and to evaluate improvements. This is the fourth annual status report

  8. Program Evaluation - Automotive Lightweighting Materials Program Research and Development Projects Assessment of Benefits - Case Studies No. 2

    Energy Technology Data Exchange (ETDEWEB)

    Das, S.

    2003-01-23

    This report is the second of a series of studies to evaluate research and development (R&D) projects funded by the Automotive Lightweighting Materials (ALM) Program of the Office of Advanced Automotive Technologies (OAAT) of the U.S. Department of Energy (DOE). The objectives of the program evaluation are to assess short-run outputs and long-run outcomes that may be attributable to the ALM R&D projects. The ALM program focuses on the development and validation of advanced technologies that significantly reduce automotive vehicle body and chassis weight without compromising other attributes such as safety, performance, recyclability, and cost. Funded projects range from fundamental materials science research to applied research in production environments. Collaborators on these projects include national laboratories, universities, and private sector firms, such as leading automobile manufacturers and their suppliers. Three ALM R&D projects were chosen for this evaluation: Design and Product Optimization for Cast Light Metals, Durability of Lightweight Composite Structures, and Rapid Tooling for Functional Prototyping of Metal Mold Processes. These projects were chosen because they have already been completed. The first project resulted in development of a comprehensive cast light metal property database, an automotive application design guide, computerized predictive models, process monitoring sensors, and quality assurance methods. The second project, the durability of lightweight composite structures, produced durability-based design criteria documents, predictive models for creep deformation, and minimum test requirements and suggested test methods for establishing durability properties and characteristics of random glass-fiber composites for automotive structural composites. The durability project supported Focal Project II, a validation activity that demonstrates ALM program goals and reduces the lead time for bringing new technology into the marketplace. Focal

  9. Summary results of an assessment of research projects in the National Photovoltaics Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The Office of Energy Research (OER) undertook an assessment of 115 research projects (listed in Appendix A) sponsored by the National Photovoltaics Program. The Program is located within the Office of Energy Efficiency and Renewable Energy (EE). This report summarizes the results of that review. The Office of Solar Energy Conversion is responsible for the management of the National Photovoltaics Program. This program focuses on assisting US industry in development of fundamental technology to bring advanced photovoltaic energy systems to commercial use. The purpose of the assessment was to determine the following: (1) the quality of research of individual projects; (2) the impact of these individual projects on the mission of the program; and (3) the priority of future research opportunities.

  10. UMTRA project office federal employee occupational safety and health program plan

    International Nuclear Information System (INIS)

    1994-06-01

    This document establishes the Federal Employee Occupational Safety and Health (FEOSH) Program for the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project Office. This program will ensure compliance with applicable requirements of DOE Order 3790.1B and DOE Albuquerque Operations Office (AL) Order 3790.lA. FEOSH Program responsibilities delegated by the DOE-AL to the UMTRA Project Office by AL Order 3790.1A also are assigned. The UMTRA Project Office has developed the UMTRA Project Environmental, Safety, and Health (ES ampersand H) Plan (DOE, 1992), which establishes the basic programmatic ES ampersand H requirements for all participants on the UMTRA Project. The ES ampersand H plan is designed primarily to cover remedial action activities at UMTRA sites and defines the ES ampersand H responsibilities of both the UMTRA Project Office and its contractors. The UMTRA FEOSH Program described herein is a subset of the overall UMTRA ES ampersand H program and covers only federal employees working on the UMTRA Project

  11. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Science.gov (United States)

    2010-10-01

    ... designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78... Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical... acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  12. 78 FR 8544 - Training Program for Regulatory Project Managers; Information Available to Industry

    Science.gov (United States)

    2013-02-06

    ...] Training Program for Regulatory Project Managers; Information Available to Industry AGENCY: Food and Drug... Brum, Center for Drug Evaluation and Research, Food and Drug Administration, 10903 New Hampshire Ave... to industry's drug development processes and (2) a venue for sharing information about project...

  13. 32 CFR 37.220 - How involved should the Government program official be in the project?

    Science.gov (United States)

    2010-07-01

    ... official be in the project? 37.220 Section 37.220 National Defense Department of Defense OFFICE OF THE... Technology Investment Agreements § 37.220 How involved should the Government program official be in the project? (a) TIAs are used to carry out cooperative relationships between the Federal Government and the...

  14. Secret Message Decryption: Group Consulting Projects Using Matrices and Linear Programming

    Science.gov (United States)

    Gurski, Katharine F.

    2009-01-01

    We describe two short group projects for finite mathematics students that incorporate matrices and linear programming into fictional consulting requests presented as a letter to the students. The students are required to use mathematics to decrypt secret messages in one project involving matrix multiplication and inversion. The second project…

  15. A Conflict’s Impact on Project Goals and Reputation Risk : Lessons from Kosovo Privatization Program

    OpenAIRE

    Bach, Karl

    2008-01-01

    When designing and implementing a project in a conflict-affected country, some of the conflict's more obvious impacts-damage to infrastructure and energy supplies, are apt to immediately come to mind. However, based on the experiences with the Kosovo privatization program, there are additional problems related to a conflict's aftermath that may be overlooked during a project's design but w...

  16. 23 CFR 661.23 - How will a bridge project be programmed for funding once eligibility has been determined?

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false How will a bridge project be programmed for funding once... bridge project be programmed for funding once eligibility has been determined? (a) All projects will be... time, the project will be acknowledged as either BIA and Tribally owned, or non-BIA owned and placed in...

  17. Law project of program relative to the management of radioactive materials and wastes

    International Nuclear Information System (INIS)

    Villepin, D. de; Breton, T.

    2006-03-01

    The law of the 30 December 1991 defined three axis of researches and fixed a the legal aspects of the researches programs management. Based on these researches results a law project has been defined. The first part of the document presents the objectives of the law project and discusses the different articles. The second part is devoted to the text of the law project. (A.L.B.)

  18. Heuristic algorithm for single resource constrained project scheduling problem based on the dynamic programming

    Directory of Open Access Journals (Sweden)

    Stanimirović Ivan

    2009-01-01

    Full Text Available We introduce a heuristic method for the single resource constrained project scheduling problem, based on the dynamic programming solution of the knapsack problem. This method schedules projects with one type of resources, in the non-preemptive case: once started an activity is not interrupted and runs to completion. We compare the implementation of this method with well-known heuristic scheduling method, called Minimum Slack First (known also as Gray-Kidd algorithm, as well as with Microsoft Project.

  19. Photovoltaic test and demonstration project. [residential energy program

    Science.gov (United States)

    Forestieri, A. F.; Brandhorst, H. W., Jr.; Deyo, J. N.

    1976-01-01

    The considered project consists of three subprojects related to applications, device performance and diagnostics, and endurance testing. The objectives of the applications subproject include the determination of the operating characteristics for a variety of photovoltaic conversion systems. A system test facility is being constructed in this connection and a prototype residence experiment is to be conducted. Market demand for solar cells is to be stimulated by demonstrating suitability of solar cells for specific near-term applications. Activities conducted in connection with device performance studies and diagnostics are also discussed along with developments in the area of endurance testing.

  20. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1995 quality program status report

    International Nuclear Information System (INIS)

    Bolivar, S.L.

    1996-07-01

    This status report summarizes the activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project's (YMP's) quality assurance program for January 1 to September 30, 1995. The report includes major sections on program activities and trend analysis

  1. Review projects for the US Fusion Program: Progress report, December 1, 1984-February 28, 1987

    International Nuclear Information System (INIS)

    Ribe, F.L.

    1988-01-01

    This paper reviews projects at the University of Washington on the following topics: Magnetic Fusion Energy Program Plan (Feb. 1985); High Density Power Systems; Fusion Systems Studies; Burning Plasmas and Compact Ignition Tokamak; US Magnetic Mirror Program; and Technical Planning Activity (Jan. 1987)

  2. River Protection Project waste feed delivery program technical performance measurement assessment plan

    International Nuclear Information System (INIS)

    O'TOOLE, S.M.

    1999-01-01

    This plan establishes a formal technical performance-monitoring program. Technical performance is assessed by establishing requirements based performance goals at the beginning of a program and routinely evaluating progress in meeting these goals at predetermined milestones throughout the project life cycle

  3. USL/DBMS NASA/PC R and D project C programming standards

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Moreau, Dennis R.

    1984-01-01

    A set of programming standards intended to promote reliability, readability, and portability of C programs written for PC research and development projects is established. These standards must be adhered to except where reasons for deviation are clearly identified and approved by the PC team. Any approved deviation from these standards must also be clearly documented in the pertinent source code.

  4. Los Alamos National Laboratory Yucca Mountain Site Characterization Project: 1991 quality program status report

    International Nuclear Information System (INIS)

    1992-07-01

    This status report summarizes the activities and accomplishments of the Los Alamos National Laboratory (Los Alamos) Yucca Mountain Site Characterization Project's (YMP) quality assurance program for calendar year 1991. The report is divided into three Sections: Program Activities, Verification Activities, and Trend Analysis

  5. 75 FR 75532 - Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report

    Science.gov (United States)

    2010-12-03

    ...] Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report AGENCY: Federal Highway... participating in the Pilot Program, 23 U.S.C. 327(g) mandates semiannual audits during each of the first 2 years of State participation. This notice announces and solicits comments on the fifth audit report for the...

  6. 76 FR 5237 - Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report

    Science.gov (United States)

    2011-01-28

    ...] Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report AGENCY: Federal Highway... participating in the Pilot Program, 23 U.S.C. 327(g) mandates semiannual audits during each of the first 2 years of State participation. This final report presents the findings from the fifth FHWA audit of the...

  7. 77 FR 26355 - Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report

    Science.gov (United States)

    2012-05-03

    ...] Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report AGENCY: Federal Highway... participating in the Pilot Program, 23 U.S.C. 327(g) mandates semiannual audits during each of the first 2 years of State participation. This final report presents the findings from the sixth FHWA audit of the...

  8. Progress of the Hanford Bulk Vitrification Project ICVTM Testing Program

    International Nuclear Information System (INIS)

    Witwer, K.S.; Woolery, D.W.; Dysland, E.J.

    2006-01-01

    In June 2004, the Bulk Vitrification Project was initiated with the intent to engineer, construct and operate a full-scale bulk vitrification pilot-plant to treat low-activity tank waste from Hanford tank 241-S-109. The project, managed by CH2M HILL Hanford Group, Inc., and performed by AMEC Earth and Environmental, Inc. (AMEC), will develop and operate a full-scale demonstration facility to exhibit the effectiveness of the bulk vitrification process under actual operating conditions. Since project initiation, testing has been undertaken using crucible-scale, 1/6 linear (engineering) scale, and full-scale vitrification equipment. Crucible-scale testing, coupled with engineering-scale testing, helps establish process limitations of selected glass formulations. Full-scale testing provides critical design verification of the In Container Vitrification (ICV) TM process both prior to and during operation of the demonstration facility. Beginning in late 2004, several full-scale tests have been performed at AMEC's test site, located adjacent to the U.S. Department of Energy's Hanford Site, in Richland, WA. Early testing involved verification of melt startup methodology, followed by subsequent full-melt testing to validate critical design parameters and demonstrate the 'Bottom-Up, Feed While Melt' process. As testing has progressed, design improvements have been identified and incorporated into each successive test. Full scale testing at AMEC's test site is currently scheduled to complete in 2006, with continued full-scale operational testing at the demonstration facility on the Hanford Site starting in 2007. Additional engineering scale testing will validate recommended glass formulations that have been provided by the Pacific Northwest National Laboratory (PNNL). This testing is expected to continue through 2006. This paper discusses the progress of the full-scale and engineering scale testing performed to date. Crucible-scale testing, a critical step in developing

  9. UMTRA Project Administrative Files Collection Records Management Program

    International Nuclear Information System (INIS)

    1994-09-01

    The UPAFC Records Management Plan is based on the life cycle of a record - the evolution of a record from creation until final disposition. There are three major phases in the life cycle of a record: (1) creation and receipt, (2) maintenance and use, and (3) disposition. Accordingly, the Records Management Plan is structured to follow each of those phases. During each of the three phases, some kind of control is mandatory. The Records Management Plan establishes appropriate standards, policies, and procedures to ensure adequate control is always maintained. It includes a plan for records management, a plan for records management training activities, and a plan for auditing and appraising the program

  10. Emergency Immigration Education Act Programs: Summer E.S.L. Welcome Plus Program for Students of Limited English Proficiency (LEP), Summer Bilingual Program, and Project Omega. OREA Report.

    Science.gov (United States)

    Duque, Diana L.

    This report presents findings of the evaluation by the New York City public school system's Office of Research, Evaluation, and Assessment of three programs (Summer E.S.L. Welcome Plus, Summer Bilingual, and Project Omega) for immigrant students. The Summer E.S.L. (English as a Second Language) Welcome Plus program operated at 19 sites in New York…

  11. The Dark Snow Project: a hybrid research communication program

    Science.gov (United States)

    Box, J. E.; Sinclair, P.

    2015-12-01

    The Dark Snow Project, to crowd fund and communicate Greenland ice-climate interactions expedition research, was a baptism by fire climate communications venture. We did it without a guide book and ran on pure inspiration. Along the way, we acquired quite some of the communication skill set: marketing; social psychology; crowd funding; conventional media; video production; social media.The aim of this presentation is to inventory lessons learned, experience, and resolve recommendations how to do it better for those adventurous enough to do a crowd funded actvity. Key themes are amplifying basic research, engagement in citizen science, outreach, communication.Quickly, one begins thinking of success tactics, like launching news on a Monday instead of a Saturday or keeping the conversation going by telling the story from different and evolving perspectives. The experience taught that unconventional funding is harder won than conventional funding. Yet, because the support came from unconventional sources, the public, we began tapping a large resource in citizen science engagement. If having a compelling call to action such a campaign can be a significant source of sustain. What had also proven difficult was doing it with a small team when each of the following skills demands a larger group; running a media campaign; logistics; video recording and editing; social media promotion; conventional media engagement. The issue and brand awareness grows in a snowball effect encouraging us to run successive annual campaigns.Now in third year, the project can be more effective if upscaling from a single to a multi-cell organization.

  12. Waste Management Project Quality Assurance Program Plan (QAPP)

    International Nuclear Information System (INIS)

    HORHOTA, M.J.

    2000-01-01

    The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence

  13. Quality Assurance Program Plan (QAPP) Waste Management Project

    Energy Technology Data Exchange (ETDEWEB)

    HORHOTA, M.J.

    2000-12-21

    The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence.

  14. Education projects: an opportunity for student fieldwork in global health academic programs.

    Science.gov (United States)

    Fyfe, Molly V

    2012-01-01

    Universities, especially in higher-income countries, increasingly offer programs in global health. These programs provide different types of fieldwork projects, at home and abroad, including: epidemiological research, community health, and clinical electives. I illustrate how and why education projects offer distinct learning opportunities for global health program fieldwork. As University of California students, we partnered in Tanzania with students from Muhimbili University of Health and Allied Science (MUHAS) to assist MUHAS faculty with a curricular project. We attended classes, clinical rounds, and community outreach sessions together, where we observed teaching, materials used, and the learning environment; and interviewed and gathered data from current students, alumni, and health professionals during a nationwide survey. We learned together about education of health professionals and health systems in our respective institutions. On the basis of this experience, I suggest some factors that contribute to the productivity of educational projects as global health fieldwork.

  15. Status of Pantex Plant Waste Management Project/program control system

    International Nuclear Information System (INIS)

    Price, Wesley J.; Matthews, William L.

    1992-01-01

    During a December 1990 Waste Management Program Review held in Albuquerque, New Mexico, the Waste Management and Operational Surety Division (WMOSD) introduced the project control system to be used for the Waste Management (WM) Operations Program. The system was entitled 'TRAC-WM' (Tracking and Control for Waste Management). The stated objective for this system was to establish a frame work for planning, managing, and controlling work within the WM program. As a result Mason and Hanger (the operating contractor at the Pantex Plant) initiated the development of a computerized waste management project tracking system. (author)

  16. Browse Title Index - African Journals Online

    African Journals Online (AJOL)

    Items 151 - 200 of 771 ... Issue, Title. Vol 33, No 4 (2013), Community-researcher liaisons: the Pathways to Resilience Project Advisory Panel, Abstract PDF. LC Theron. Vol 37, No 3 (2017), Comparing the achievement goal orientation of mathematics learners with and without attention-deficit hyperactivity disorder, Abstract ...

  17. One-year effects of Project EX: A smoking intervention pilot program with Spanish adolescents.

    Science.gov (United States)

    Espada, José P; Gonzálvez, María T; Orgilés, Mireia; Sussman, Steve

    2017-07-01

    Adolescent smoking is a major public health problem, which has led to the development of cessation programs such as Project EX. However, there is no evidence for the long-term efficacy of cessation among Spanish adolescents. This study provides a 1-year follow-up evaluation of the Project EX tobacco use cessation program among 211 smokers. The intent-to-treat 30-day smoking quit rate for the program group was 7.81 percent ( p = .04), whereas no smokers quit in the control group ( p = .02). The intervention had a significant influence on future smoking expectation, intention, motivation to quit, and overall level of 30-day smoking. Long-term outcomes of the Project EX clinic-based program are promising for adolescent smokers in Spain.

  18. Project Report ECLIPSE: European Citizenship Learning Program for Secondary Education

    Directory of Open Access Journals (Sweden)

    Olga Bombardelli

    2014-04-01

    Full Text Available This paper reports on a European project, the Comenius ECLIPSE project (European Citizenship Learning in a Programme for Secondary Education developed by six European partners coordinated by the University of Trento in the years 2011-2014. ECLIPSE (co-financed by the EACEA - Education, Audiovisual and Culture Executive Agency aims at developing, testing, and implementing a Programme of European Citizenship, in order to improve citizenship competence and responsibility and to strengthen the sense of belonging and European identity of 8th grade pupils. These goals are reachable thanks to a number of measures in formal, non-formal and informal fields. The project partners created teaching and monitoring tools for pupils: seven ECMs (European Citizenship Modules, knowledge tests, pupils’ portfolio, and suggestions for teachers, especially a portfolio for ECLIPSE educators. The ECLIPSE teaching/ testing materials were implemented in several schools of the partner’s countries in order to make sure that it is useful for European pupils of different school systems. It can be used in a flexible way keeping in mind different learning needs in each school system, with a view to improving transversal competencies like learning to learn, as well as initiative and active involvement in improving the chances for young people in citizenship and work worlds. Dieses Papier beschreibt ein europäisches Projekt: das Comenius Projekt ECLIPSE (European Citizenship Learning in einem Programm für Secondary Education, das von sechs europäischen Partnern entwickelt und von der Universität Trient in den Jahren 2011-2014 koordiniert wurde. ECLIPSE wurde von der EACEA (Education, Audiovisual and Culture Executive Agency kofinanziert; es zielt auf die Entwicklung, Überprüfung und Implementierung eines Programms zur Entwicklung eines europäischen Bürgersinns, um Kompetenzen als Staatsbürger und zugleich einer europäischen Identität und Verantwortung bei Sch

  19. Power Grid Construction Project Portfolio Optimization Based on Bi-level programming model

    Science.gov (United States)

    Zhao, Erdong; Li, Shangqi

    2017-08-01

    As the main body of power grid operation, county-level power supply enterprises undertake an important emission to guarantee the security of power grid operation and safeguard social power using order. The optimization of grid construction projects has been a key issue of power supply capacity and service level of grid enterprises. According to the actual situation of power grid construction project optimization of county-level power enterprises, on the basis of qualitative analysis of the projects, this paper builds a Bi-level programming model based on quantitative analysis. The upper layer of the model is the target restriction of the optimal portfolio; the lower layer of the model is enterprises’ financial restrictions on the size of the enterprise project portfolio. Finally, using a real example to illustrate operation proceeding and the optimization result of the model. Through qualitative analysis and quantitative analysis, the bi-level programming model improves the accuracy and normative standardization of power grid enterprises projects.

  20. Integrated Multidisciplinary Fault Observation System in the western part of the main Marmara Fault in the frame of an EU-FP7 project, titled as MARSITE

    Science.gov (United States)

    Ozel, Oguz; Guralp, Cansun; Tunc, Suleyman; Yalcinkaya, Esref; Meral Ozel, Nurcan

    2015-04-01

    The main objective of this study is to install a multi-parameter borehole system and surface array consisting of eight broadband sensors as close to the main Marmara Fault (MMF) in the western Marmara Sea as possible, and measure continuously the evolution of the state of the fault zone surrounding the MMF and to detect any anomaly or change which may occur before earthquakes by making use of the data from these arrays. The multi-parameter borehole system is composed of very wide dynamic range and stable borehole (VBB) broad band seismic sensor, and incorporate 3-D strain meter, tilt meter, and temperature and local hydrostatic pressure measuring devices. All these sensors are installed in 146m-deep borehole. All the sensor outputs are digitized; total of 11*24 bit-channels and 6*20 bit-channels. Real-time data transmission to the main server of the Marsite Project at Kandilli Observatory in Istanbul is accomplished. The multi-parameter borehole seismic station uses the latest update technologies and design ideas to record "Earth tides" signals to the smallest magnitude -3 events, as the innovative part of the Marsite Project. Bringing face to face the seismograms of microearthquakes recorded by borehole and surface instruments portrays quite different contents. The shorter recording duration and nearly flat frequency spectrum up to the Nyquist frequencies of borehole records are faced with longer recording duration and rapid decay of spectral amplitudes at higher frequencies of a surface seismogram. The main causative of the observed differences are near surface geology effects that mask most of the source related information the seismograms include, and that give rise to scattering, generating longer duration seismograms. In view of these circumstances, studies on microearthquakes employing surface seismograms may bring on misleading results. Particularly, the works on earthquake physics and nucleation process of earthquakes requires elaborate analysis of tiny

  1. Nuclear criticality safety program for environmental restoration projects

    International Nuclear Information System (INIS)

    Marble, R.C.; Brown, T.D.

    1994-05-01

    The Fernald Environmental Management Project (FEMP), formerly known as the Feed Materials Production Center (FMPC), is located on a 1050 acre site approximately twenty miles northwest of Cincinnati, Ohio. The production area of the site covers approximately 136 acres in the central portion of the site. Surrounding the core production area is a buffer consisting of leased grazing land, reforested land, and unused areas. The uranium processing facility was designed and constructed in the early 1950s. During the period from 1952 to 1989 the site produced uranium feed material and uranium products used in the United States weapons complex. Production at the site ended in 1989, when the site was shut down for what was expected to be a short period of time. However, the FUTC was permanently shut down in 1991, and the site's mission was changed from production to environmental restoration. The objective of this paper is to give an update on activities at the Fernald Site and to describe the Nuclear Criticality Safety issues that are currently being addressed

  2. Grande Ronde Model Watershed Program Administration and Habitat Projects, Annual Progress Report, Project Period: Program Administration: January 1, 1997 - December 31, 1997 Habitat Projects: January 1, 1997 - March 31, 1998.

    Energy Technology Data Exchange (ETDEWEB)

    Noyes, Cecilia; Kuchenbecker, Lyle; Perry, Patty

    1998-10-28

    This agreement provided funding for operation and administration of the Grande Ronde Model Watershed Program including staffing of an Executive Director, Program Planner, and clerical personnel. The contract covers maintaining program services, project planning, subwatershed plans (CRMP's), public involvement and education, interagency coordination/clearing house, monitoring, and technical support activities that have taken place in the Grande Ronde basin. Cost-share has been received from the Bureau of Reclamation and the Governor's Watershed Enhancement Board.

  3. 75 FR 59049 - International Education Programs Service; Fulbright-Hays Group Projects Abroad Program

    Science.gov (United States)

    2010-09-24

    ... second language and knowledge of other cultures around the world by supporting short-term projects abroad... knowledge of languages and cultures from around the world. The second priority supports projects that will... countries, cultures and languages, but from each other as well. This collaboration amongst educators at...

  4. STRATEGIC PROJECT MANAGEMENT PRINCIPLES, PROGRAMS AND PORTFOLIOS OF THE MEDICAL INSTITUTION

    Directory of Open Access Journals (Sweden)

    Елена Борисовна ДАНЧЕНКО

    2017-03-01

    Full Text Available The article gives a brief overview of the latest research in the direction of the use of the project-based approach to the management of medical institutions. It is shown that medicine today is a project-oriented area, and modern scientific studies suggest the use of not only the project management approach and portfolio management. The various scientific sources proposed the classification of projects of medical institutions, mechanisms of formation of projects portfolios of such institutions. The concept of integrated management of medical institutions, which includes strategic, project, portfolio, program management approach (S3P-concept, is offered. According to this concept, the process of S3P-management of the medical institution will include four stages, which are closely interrelated. For the first time, the pair principles of S3P-management are formulated. The proposed concept and principles of S3P-management of medical institution require further development and creating of models, methods and integrated management tools, as well as the development of a system of indicators verify compliance with the organization's strategy of its projects, projects portfolios and programs. This concept and the proposed integrated management principles are universal and can be applied to any project-oriented area.

  5. Managing the Moon Program: Lessons Learned from Project Apollo

    Science.gov (United States)

    1999-01-01

    There have been many detailed historical studies of the process of deciding on and executing the Apollo lunar landing during the 1960s and early 1970s. From the announcement of President John F Kennedy on May 25, 1961, of his decision to land an American on the Moon by the end of the decade, through the first lunar landing on July 20, 1969, on to the last of six successful Moon landings with Apollo 17 in December 1972, NASA carried out Project Apollo with enthusiasm and aplomb. While there have been many studies recounting the history of Apollo, at the time of the 30th anniversary of the first lunar landing by Apollo 11, it seems appropriate to revisit the process of large-scale technological management as it related to the lunar mission. Consequently, the NASA History Office has chosen to publish this monograph containing the recollections of key partcipants in the management process. The collective oral history presented here was recorded in 1989 at the Johnson Space Center's Gilruth Recreation Center in Houston, Texas. It includes the recollections of key participants in Apollo's administration, addressing issues such as communication between field centers, the prioritization of technological goals, and the delegation of responsibility. The following people participated: George E. Muller, Owen W. Morris, Maxime A. Faget, Robert R. Gilruth, Christopher C. Kraft, and Howard W. (Bill) Tindall. The valuable perspectives of these individuals deepen and expand our understanding of this important historical event. This is the 14th in a series of special studies prepared by the NASA History Office. The Monographs in Aerospace History series is designed to provide a wide variety of investigations relative to the history of aeronautics and space. These publications are intended to be tightly focused in terms of subject, relatively short in length, and reproduced in an inexpensive format to allow timely and broad dissemination to researchers in aerospace history.

  6. Browse Title Index

    African Journals Online (AJOL)

    Issue, Title. Vol 25, No 2 (2005), Yam-based farm practices and nematode problems in stored yams (Dioscorea spp.) in Ghana, Abstract PDF. CK Kwoseh, RA Plowright, J Bridge, R Asiedu. Vol 27, No 2 (2007), Yield, irrigation production efficiency and economic returns of broccoli under variable drip irrigation and lateral ...

  7. Browse Title Index

    African Journals Online (AJOL)

    Items 51 - 68 of 68 ... Issue, Title. Vol 12, No 1-2 (2009), Sécurité et ordre politique au Cameroun : entre dynamiques internes et connexions internationales, Abstract PDF. BEP Chantal. Vol 6, No 1-2 (2003), Self-Determination, Nationalism, Development and Pan-Africanism Stuck on the Runway: Are Intellectuals to be Blamed ...

  8. Browse Title Index

    African Journals Online (AJOL)

    Items 551 - 600 of 1463 ... Issue, Title. Vol 15, No 2 (2015), Evaluation of the diagnostic performance and operational characteristics of four rapid immunochromatographic syphilis tests in Burkina Faso, Abstract PDF. FY Bocoum, H Ouedraogo, G Tarnagda, A Kiba, S Tiendrebeogo, F Bationo, B Liestman, S Diagbouga, ...

  9. Browse Title Index

    African Journals Online (AJOL)

    Items 351 - 400 of 400 ... Issue, Title. Vol 9, No 1 (2010), Soft tissue sarcoma of the thigh: Need for angiography in the developing, Abstract PDF. IA Adigun, GA Rahman, KO Ogundipe. Vol 3, No 1 (2004), Spectrum of rheumatic heart disease in Zaria, Northern Nigeria, Abstract. SS Danbauchi, MA Alhassan, SO David, ...

  10. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 50 of 183 ... Issue, Title. Vol 62 (2017), #SchoolsOnFire: Criminal justice responses to protests that impede the right to basic education, Abstract PDF. Ann Skelton, Martin Nsibirwa. Vol 45 (2013), 'Pale Face'/'Pointy Face: SA Criminology in Denial, Abstract PDF. S Henkeman. Vol 59 (2017), Aluta continua: Police ...

  11. Browse Title Index

    African Journals Online (AJOL)

    Items 51 - 100 of 391 ... Journal Home > Advanced Search > Browse Title Index ... Efficacy of four Rodenticides on the Ghanaian Market, Abstract ... Vol 2, No 1 (2000):, Determination of some wear elements in used car engine oil and oil filter ...

  12. Browse Title Index

    African Journals Online (AJOL)

    Items 251 - 300 of 490 ... Issue, Title. Vol 6, No 2 (2010), Knowledge and patterns of use of highly active antiretroviral therapies in HIV management at Abuja, Nigeria, Abstract. Jill I Okpalugo, US Inyang, K Ibrahim, F Anita, Chinwe V Ukwe, NC Aguwa. Vol 5, No 4 (2009), Knowledge and utilization of the acts in two major ...

  13. Browse Title Index

    African Journals Online (AJOL)

    Items 9951 - 10000 of 11090 ... Issue, Title. Vol 10, No 36 (2011), Study of heavy metals bioaccumulation in the process of vermicomposting, Abstract PDF. MM Aleagha, G Ebadi. Vol 10, No 45 (2011), Study of malondialdehyde (MDA) content, superoxide dismutase (SOD) and glutathione peroxidase (GSH-Px) activities in ...

  14. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 50 of 412 ... Issue, Title. Vol 32, No 2 (2013), Seinsverständnis and meaning in Heidegger, Abstract. Rafael Winkler. Vol 21, No 3 (2002), A defense of peace as a human right, Abstract. Patrick Hayden. Vol 26, No 2 (2007), A Kantian stance on teleology in biology, Abstract. AA Cohen. Vol 30, No 1 (2011), A Likely ...

  15. Browse Title Index

    African Journals Online (AJOL)

    Items 251 - 300 of 328 ... Issue, Title. Vol 7, No 1 (2003), Sexual Harassment in Academia in Nigeria: How Real? Details PDF. Olugbenga Jelil Ladebo. Vol 8, No 2 (2004), Shaping the internet for match-making/dating: a challenge for the contemporary Nigerian family institution, Abstract PDF. Wale Adesina. Vol 6, No 1 (2002) ...

  16. Browse Title Index

    African Journals Online (AJOL)

    Items 51 - 73 of 73 ... Journal Home > Advanced Search > Browse Title Index ... Vol 13 (2006), The ageing eye” functional changes from cradle to gray: A ... Vol 12 (2005), The evaluation of vision in children using monocular vision acuity and ...

  17. Browse Title Index

    African Journals Online (AJOL)

    Issue, Title. Vol 22, No 2 (2008), Voltammetric determination of heparin based on its interaction with malachite green, Abstract PDF. Xueliang Niu, Weili Zhang, Na Zhao, Wei Sun. Vol 22, No 2 (2008), Voltammetric determination of l-cysteic acid on a 1-[4-(ferrocenyl-ethynyl)phenyl]-1-ethanone modified carbon paste ...

  18. Browse Title Index

    African Journals Online (AJOL)

    Items 201 - 250 of 577 ... Issue, Title. Vol 20, No 2 (2003), Emergency Contraception: A Global Overview of Knowledge, Attitudes and Practices Among Providers, Abstract PDF. Deborah Haggai. Vol 23 (2006):, Emergency laparotomy for peripartum haemorrhage in Bida North Central Nigeria, Abstract PDF. Sunny Abiodun O ...

  19. Browse Title Index

    African Journals Online (AJOL)

    Items 201 - 250 of 11090 ... Issue, Title. Vol 12, No 49 (2013), In vitro regeneration of selected Kenyan papaya (Carica papaya L.) lines through shoot tip culture, Abstract PDF. Naomi Nzilani Mumo, Fredah Karambu Rimberia, George Edward Mamati, Agnes Wanjiru Kihurani. Vol 7, No 12 (2008), In vitro regeneration of Turkish ...

  20. Browse Title Index

    African Journals Online (AJOL)

    Items 151 - 200 of 221 ... Issue, Title ... Vol 38 (2010), Soft drink consumption of Grade 4 and Grade 7 learners in the Wynberg area, City of Cape Town, South .... Vol 42 (2014), The meaning of food for obese men: a qualitative study, Abstract PDF.

  1. Browse Title Index

    African Journals Online (AJOL)

    Items 101 - 150 of 1215 ... Journal Home > Advanced Search > Browse Title Index. Log in or ... Vol 12, No 1 (2018), Analysis of the effects of frequent strikes on academic performance of students in universities in Nigeria: Edo State as a focal point, Abstract PDF ... Vol 6, No 1 (2012), Appraisal as a Determinant for Adequate ...

  2. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 20 of 20 ... Issue, Title. Vol 9, No 2 (2000), Age dependent changes in the hypothalamic amino acid neurotransmitters in response to nicotine, Abstract. NM Radwan, NA Ahmed, YAM Aly. Vol 9, No 2 (2000), Autoantibodies, ocular and auditory changes in patients with vitiligo, Abstract. AE Fathia, EA Nagwa, ...

  3. Browse Title Index

    African Journals Online (AJOL)

    Items 51 - 76 of 76 ... Issue, Title. Vol 6, No 1 (2013), Integrating Sustainability into the Real Estate Valuation Process: A Nigerian Perspective, Abstract PDF. G K Babawale, B A Oyalowo. Vol 5, No 1 (2012), Internalising internationa valuation standards: Relevance and applicability issues in the Nigerian context, Abstract PDF.

  4. Browse Title Index

    African Journals Online (AJOL)

    Items 51 - 100 of 201 ... Issue, Title. Vol 12, No 1 (2006), Conservative management of cervical ectopic pregnancy: case report, Abstract PDF. TD Naidoo, MR Ramogale, J Moodley. Vol 18, No 2 (2012), Contraceptive use and associated factors among South African youth (18 - 24 years): A population-based survey, Abstract ...

  5. Browse Title Index

    African Journals Online (AJOL)

    Items 151 - 183 of 183 ... Issue, Title. Vol 9, No 1 (2004), Socio-economic constraints affecting youths involvement in national economic development, Abstract. Josephine U Nwagwu. Vol 12, No 2 (2007), Stabilizing Potential Of Cement-Fly Ash Mixture On Expansive Clay Soil, Abstract. OO Amu, AB Fajobi, SO Afekhuai. Vol 11 ...

  6. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 50 of 76 ... Issue, Title. Vol 16, No 2 (2006), A profile of the theatre procedures in paediatrict ophthalmic practice, Abstract. E O Onwasigwe. Vol 15, No 2 (2005), Abdominal cocoon, Abstract. Abdulrasheed K Adesunkanmi, Tajudeen A Badmus, Olukayode Ogundoyin, Akinwumi B Ogunrombi. Vol 18, No 1 (2008) ...

  7. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 50 of 647 ... Issue, Title. Vol 13, No 2 (2010), 'N toekomstige perspektief op grondwetlike stabiliteit, Abstract PDF. F.W de Klerk. Vol 18, No 5 (2015), Cloete murray and Another v Firstrand bank ltd t/a Wesbank [2015] ZASCA 39A, Abstract PDF. M Laubscher. Vol 15, No 5 (2012), Cave Pecuniam: Lawyers as ...

  8. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 15 of 15 ... Issue, Title. Vol 1, No 1 (2008), Assessment Of Ophthalmic Patients' Satisfaction In Owo, Abstract. CO Omolase, CO Fadamiro, BO Omolase, AS Aina, EO Omolade. Vol 3, No 1 (2010), Case Report: Strongyloides stercoralis coinfection in a Nigerian with HIV. Abstract. A.A Oyekunle, R.A.A Bolarinwa, O.A ...

  9. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 15 of 15 ... Issue, Title. Vol 1, No 1 (2007), An Action Five Strategy For Bridging The Gender Gap In Academic Research Activities In African Universities. The Case of Nigeria, Abstract PDF. DN Okorie, OG Agabi, CM Uche. Vol 1, No 1 (2007), Book Review: Confronting sexual harassment in Ghanaian Universities ...

  10. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 50 of 93 ... Issue, Title. Vol 5 (2013), A cost-effective Geographic Information Systems for Transportation (GIS-T) application for traffic congestion analyses in the Developing World, Abstract PDF. E Agyemang. Vol 3 (2011), A Historical and Gendered Perspective on HIV / AIDS in Botswana, Abstract PDF. J Hesselberg ...

  11. Browse Title Index

    African Journals Online (AJOL)

    Items 201 - 250 of 327 ... Issue, Title. Vol 10, No 4 (2016), Omphalocoeles: A decade in review, Abstract PDF. S Singh, A Madaree. Vol 2, No 4 (2008), Ortner syndrome, Abstract PDF. E Meyer, NE Jones, LJ Zühlke. Vol 10, No 3 (2016), Outcome of children admitted to a general highcare unit in a regional hospital in the ...

  12. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 50 of 814 ... Issue, Title. Vol 21, No 2 (2016), A 10 years trend of peptic ulcer disease and other gastrointestinal disorders in northern Uganda, Abstract PDF. T.R. Okello, D.M. Ogwang, I Pecorella. Vol 21, No 2 (2016), A 2-years description of traumatic brain injury admissions in Tikur Anbessa Specialized Hospital ...

  13. Browse Title Index

    African Journals Online (AJOL)

    Items 301 - 350 of 577 ... Issue, Title. Vol 32, No 2 (2015), Late arrival in hospital during labour: any correlation with materno-foetal outcome? The state specialist hospital, Asubiaro, Osogbo Experience. Abstract PDF. OO Awolola. Vol 30, No 2 (2013), Late Reproductive Effects of Cancer Treatment in Young People, Abstract ...

  14. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 50 of 319 ... Issue, Title. Vol 23, No 2 (2016), Carica papaya juice enhanced in-vitro cell proliferation better than freeze-dried PBS extract using scratch assay, Abstract. A.B. Nafiu, E Abdulaziz, M.T. Rahman. Vol 23, No 2 (2016), A comparative study of the ownership and utilization of insecticide treated nets in ...

  15. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 50 of 52 ... Issue, Title. Vol 15 (2000), Ammi analysis of maize yield trials in South-Western Nigeria, Abstract. SR Ajibade, BA Ogunbodede. Vol 20 (2006), Association of yield with some agronomic characters in potatoes in a cool mid-altitude location, Abstract. CO Amadi, EE Ene Obong. Vol 20 (2006), Casein (CSN3) ...

  16. Browse Title Index

    African Journals Online (AJOL)

    Items 201 - 240 of 240 ... Issue, Title. Vol 8, No 4 (2005), Status equipment in primary health centres of Tafa Lga, North Central Nigeria, Abstract. MN Sambo, I Lewis, K Sabitu. Vol 10, No 1 (2007), Stroke at a tertiary medical institution in Northern Nigeria: Patients\\' profile and predictors of outcome, Abstract. KW Wahab, MU ...

  17. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 50 of 249 ... Issue, Title. Vol 10, No 1 (2010), Ye Shakoch Chilot (the court of the sheikhs): A traditional institution of conflict resolution in Oromiya zone of Amhara regional state, Ethiopia, Abstract PDF. M Zeleke. Vol 15, No 3 (2015), A comparative analysis of the Post- Arab Spring National Dialogues in Tunisia and ...

  18. Browse Title Index

    African Journals Online (AJOL)

    Items 101 - 150 of 670 ... Issue, Title. Vol 9, No 2 (2012), Business Planning and the Economic Growth of Small and Medium Scale Enterprises in Nigeria, Abstract. Egbe Aneozeng A, Ejoh Ndifon Ojong, Obo Ekpenyong Bassey. Vol 11, No 2 (2014), Calabar Humaphors: An Analysis of Selected Jokes in Nigerian Stand Up ...

  19. Browse Title Index

    African Journals Online (AJOL)

    Items 101 - 107 of 107 ... Issue, Title. Vol 6, No 1 (2017), The Ophthalmic status manifestations of nutritional and lifestyle disorders of men in a peri urban community in Ghana, Abstract PDF. F. Vuvor, M. Steiner-Asiedu, F.K. Saalia. Vol 2, No 1 (2013), Thyroid Disorders in Accra, Ghana: A Retrospective Histopathological Study ...

  20. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 50 of 251 ... Issue, Title. Vol 55 (2014), 20 Years of democracy: Transforming the public service, Abstract. A Ruiters. Vol 63 (2016), Zemk' iinkomo magwala ndini! Wake up! The cows are being stolen! Abstract. Sipho Pityana. Vol 56 (2014), A layperson's guide to Nene's budget statement, Abstract. B Turok.

  1. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 50 of 1007 ... Issue, Title. Vol 11, No 1 (1997), (+)-Floribundone 3 from the pods of Senna septemtrionalis, Details PDF. Gizachew Alemayehu, Bekuretsion Woldeyesus, Berhanu M Abegaz. Vol 14, No 1 (2000), 11α-Hydroxy muzigadiolide, a novel drimane sesquiterpene from the stem bark of warburgia ugandensis ...

  2. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 50 of 356 ... Issue, Title. Vol 27, No 3 (2014), A desire for weight loss in season increases disordered eating behaviour risk and energy deficiency in athletes, Abstract PDF. HH Wright, R Ford, CR Botha. Vol 29, No 3 (2016), A review of infant and young child feeding practice in hospital and the home in KwaZulu-Natal ...

  3. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 50 of 66 ... Issue, Title. Vol 48, No 1-2 (2015), A hierarchical modeling of information seeking behavior of school teachers in rural areas of Nigeria, Abstract. Manir Abdullahi Kamba. Vol 49, No 1-2 (2016), Access to electronic information resources by students of federal college of education in south east Nigeria ...

  4. Browse Title Index

    African Journals Online (AJOL)

    Items 101 - 150 of 683 ... Issue, Title. Vol 54, No 1 (2006), Bovine tuberculosis survey in urban and peri urban dairy farms in coastal humid region of Tanga, Tanzania, Abstract. ES Swai, G Shirima, S Bwanga, W Moshy. Vol 60, No 3 (2012), Browsing capacity and nutritive value of indigenous browses in a tropical Coastal ...

  5. Browse Title Index

    African Journals Online (AJOL)

    Items 151 - 200 of 387 ... Issue, Title. Vol 15, No 2 (2015), Introduction to Christian philosophy, Abstract. Charles Ogundu Nnaji. Vol 8, No 2 (2006), Is Quantum Mechanics a Complete Theory?: A Philosophical Defense of Einstein's Position, Abstract. U O Egbai. Vol 10, No 1 (2007), Jesus in Africa, Abstract. FF Edet. Vol 10, No ...

  6. Browse Title Index

    African Journals Online (AJOL)

    Items 51 - 98 of 98 ... Issue, Title. Vol 4, No 1 (2016), First-year seminar intervention: Enhancing firstyear mathematics performance at the University of Johannesburg, Abstract PDF. Melanie Jacobs, Estherna Pretorius. Vol 5, No 2 (2017), From Inky Pinky Ponky to Improving Student Understanding in Assessment: Exploring the ...

  7. Browse Title Index

    African Journals Online (AJOL)

    Items 151 - 167 of 167 ... Issue, Title ... Vol 2, No 2 (2013), Women and the Leadership Paradigm: Bridging the Workplace Gender-Gap in Nigeria, Abstract PDF ... Vol 5, No 2 (2016), Women's participation and gender issues in local governance ...

  8. Browse Title Index

    African Journals Online (AJOL)

    Items 51 - 100 of 110 ... Issue, Title. Vol 10, No 1 (2003), Incidence and Determinants of Child Labour in Nigeria: Implications for Poverty Alleviation, Abstract. Benjamin Chiedozie Okpukpara, Ngozi Odurukwu. Vol 20, No 1 (2013), Inflation and capacity utilisation in Nigeria's manufacturing sector, Abstract. OA Ishola. Vol 19, No ...

  9. Browse Title Index

    African Journals Online (AJOL)

    Items 251 - 300 of 367 ... Issue, Title. Vol 43 (2014), Some interlingual communicative challenges for foreign African interpreters in South African courtrooms, Abstract PDF. SE Usadolo, E Kotze. Vol 29 (1996), South Africa's new language policy in the context of the organisation for African unity's language plan of action for ...

  10. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 50 of 89 ... Issue, Title ... of two-phased approaches to load balancing in cloud computing, Abstract ... Vol 19, No 1 (2012), Assessing Network Services and Security in ... Vol 23, No 1 (2016), Cloud model construct for transaction-based ...

  11. Browse Title Index

    African Journals Online (AJOL)

    Items 51 - 100 of 198 ... Issue, Title ... Vol 13, No 1 (2015), Biometric Enhancement of Home and Office Security to Reduce Assassinations in Nigeria, Abstract PDF ... Vol 9, No 1 (2013), Cloud Computing: Key to IT Development in West Africa ...

  12. Browse Title Index

    African Journals Online (AJOL)

    Items 151 - 198 of 198 ... Issue, Title ... scheme for QoS and energy conservation in cloud computing, Abstract PDF ... Vol 9, No 1 (2013), Performance and Security Evaluation of ... Vol 18, No 1 (2017), Reducing capital flight through local cloud ...

  13. Browse Title Index

    African Journals Online (AJOL)

    Items 251 - 300 of 652 ... Journal Home > Advanced Search > Browse Title Index ... Vol 18, No 7 (2015), Introduction to virtual property: Lex virtualis ipsa ... Vol 17, No 1 (2014), Legal challenges relating to the commercial use of outer space, with ...

  14. Browse Title Index

    African Journals Online (AJOL)

    Items 151 - 170 of 170 ... Issue, Title. Vol 20, No 2 (2004), The Impact of Mine Closures on Rural Population Dynamics: The Case of Zhombe in Kwekwe District, Midlands Province, Zimbabwe, Abstract. Crescentia Madebwe. Vol 29, No 1 (2013), The Influence of Organisational Culture and Job Satisfaction on Intentions to ...

  15. Browse Title Index

    African Journals Online (AJOL)

    Items 101 - 150 of 263 ... Issue, Title. Vol 1, No 2 (2002), Effect of Light and Darkness on Packed Cell Volume in the Rat, Abstract. A. A. OSINUBI, F. I. DURU, C. C. NORONHA, A. O. OKANLAWON. Vol 4, No 1 (2005), Effect of Marijuana Smoking on Blood Chemistry and Serum Biogenic Amines Concentrations in Humans ...

  16. Browse Title Index

    African Journals Online (AJOL)

    Items 751 - 800 of 846 ... Journal Home > Advanced Search > Browse Title Index ... Vol 9, No 3S (2017): Special Issue, The effect of torrefaction on oil palm ... core competency skills of IRBM tax auditors towards their performance, Abstract PDF ... of exchange rates behavior in Malaysia by using NATREX model, Abstract PDF.

  17. Browse Title Index

    African Journals Online (AJOL)

    Issue, Title. Vol 38, No 1 (2004), Book Review: Unexpected Voices – Theory, Practice and Identity in the Writing Classroom. Abstract. Charly Dyers. Vol 38, No 1 (2004), Book Review: Shelley Angelil-Carter: Stolen Language? Plagiarism in Writing. Abstract. Elizabeth de Kadt. Vol 37, No 1 (2003), Book Review: The Green ...

  18. Browse Title Index - AJOL

    African Journals Online (AJOL)

    Items 501 - 508 of 508 ... Issue, Title. Vol 33, No 2 (2011), Visuele stereotipering van sportvroue in die sportmedia, Abstract. M Brandt, A Carstens. Vol 30, No 1 (2008), Volunteers\\' perceptions of benefits derived from volunteering: an empirical study, Abstract. J Surujlal, M Dhurup. Vol 33, No 1 (2011), Was the Conconi test ...

  19. Browse Title Index

    African Journals Online (AJOL)

    Items 101 - 108 of 108 ... Issue, Title. Vol 8, No 2 (2016), The status and challenges of clinical informatics development in South Africa, Abstract PDF. Abayomi Kehinde Owolabi, Thokozani Patrick Mhlongo, Neil Evans. Vol 4, No 1 (2012), The stuttering implementation of language policies in the South African education system ...

  20. Browse Title Index

    African Journals Online (AJOL)

    Items 51 - 100 of 100 ... Issue, Title. Vol 28 (2013): Special Issue, Occurrence of Cryptosporidium and Giardia in domestic animals in peri-urban communities of Kafue district, Zambia, Abstract. J Siwila, IGK Phiri, HI Enemark, M Nchito, A Olsen. Vol 26, No 1 (2009), Occurrence of foot and mouth disease serotypes in Tanzania: A ...

  1. Browse Title Index

    African Journals Online (AJOL)

    Items 801 - 850 of 11090 ... Issue, Title. Vol 10, No 61 (2011), Analysis of chemical constituents in medicinal plants of selected districts of Pakhtoonkhwa, Pakistan, Abstract PDF. I Hussain, R Ullah, J Khan, N Khan, M Zahoor, N Ullah, MuR Khattak, FA Khan, A Baseer, M Khurram. Vol 10, No 77 (2011), Analysis of chloroplast ...

  2. Browse Title Index

    African Journals Online (AJOL)

    Items 501 - 550 of 670 ... Issue, Title. Vol 11, No 4 (2014), Strategies for Fostering Creativity Among Business Education Graduates in Nigeria, Abstract. BO Nwosu, KE Ojo. Vol 13, No 1 (2015) ... Vol 10, No 1 (2013), The Challenges Facing Accounting Education: The Nigerian Experience, Abstract. OR Okolie. Vol 5 (2008), The ...

  3. Browse Title Index

    African Journals Online (AJOL)

    Items 101 - 150 of 198 ... Issue, Title ... Vol 7, No 1 (2013), Enterprise Cloud Adoption: Leveraging on the Business ... Load Balancing And Job Scheduling In Cloud Computing ... Vol 13, No 1 (2015), ICT-Based Framework for Improved Food Security in Nigeria ... Vol 5, No 1 (2012), IT-Based Solutions to the Electoral System in ...

  4. Browse Title Index

    African Journals Online (AJOL)

    Items 101 - 150 of 1117 ... Journal Home > Advanced Search > Browse Title Index ... Vol 13, No 3 (2007):, an edu-ethical perspecitve on the nature of truth: case studies in elite ... 2009: September: Supplement, An empirical study of university ...

  5. Browse Title Index

    African Journals Online (AJOL)

    Issue, Title. Vol 20, No 1 (2015), Assessment of iron status among preschool children (6 to 59 months) with and without malaria in Western Province, Kenya, Abstract. I Kisiangani, C Mbakaya, A Makokha, D Magu. Vol 20, No 1 (2015), Assessment of iron status among preschool children (6 to 59 months) with and without ...

  6. Browse Title Index

    African Journals Online (AJOL)

    Items 151 - 200 of 232 ... Issue, Title. Vol 5 (2003), Pre-School Education for a Democratic Society: Identifying Views of Stakeholders in Tanzania, Abstract. Willy LM Komba, Satoki T Mahenge, Gadi Koda. Vol 13, No 2 (2012), Process of Assuring Quality in Counselling at the National Open University of Nigeria: A Critique ...

  7. Browse Title Index

    African Journals Online (AJOL)

    Items 101 - 150 of 1732 ... Journal Home > Advanced Search > Browse Title Index ... Vol 10, No 3 (2007), An Audit Of Perioperative Cardiac Arrest At ... Vol 11, No 4 (2008), An Audit Of Rejected Repeated X-ray Films As A Quality Assurance ...

  8. Browse Title Index

    African Journals Online (AJOL)

    Items 151 - 200 of 1038 ... Issue, Title. Vol 31, No 2 (2009), Assessing the utility of a continuous, underway fish egg sampler (CUFES) for sampling zooplankton, Abstract. S Sono, CL Moloney, CD van der Lingen. Vol 38, No 4 (2016), Assessing trophic adaptability is critical for understanding the response of predatory fishes to ...

  9. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 50 of 101 ... Issue, Title. Vol 3, No 4 (2014), Chlamydia trachomatis IgG antibodies seroprevalence among students in two tertiary institutions in Anambra state, Nigeria: a comparative study, Abstract PDF. CB Duru, FE Emele, ED Adinma, CO Ifeadike, KA Uwakwe, AO Oluboyo, BO Oluboyo, C Abejegah. Vol 2, No 1 ...

  10. Browse Title Index

    African Journals Online (AJOL)

    Items 201 - 250 of 367 ... Issue, Title. Vol 42 (2013), Nursing the Cure: A Phonetic Analysis of /ʊə/ in South African English, Abstract PDF. I Bekker. Vol 1 (1980), Nuwe ontwikkelings binne chomsky se teorle van kerngrammatika, Abstract PDF. J Maartens. Vol 42 (2013), Obligatory Reflexivity in a Minimalist Grammar of ...

  11. Browse Title Index

    African Journals Online (AJOL)

    Items 651 - 700 of 1007 ... Issue, Title. Vol 4, No 1 (1990), Kinetics of oxidation of β-diimihe macrocyclic complexes and accessibility of six-coordinate copper(III) complexes generated by electrochemical oxidation of copper(II) complexes, Abstract PDF. Mohamed A. Khalifa. Vol 14, No 2 (2000), Kinetics of periodate oxidation of ...

  12. Browse Title Index

    African Journals Online (AJOL)

    Items 151 - 200 of 1020 ... Issue, Title ... Vol 48, No 2 (2006), Barriers to HIV Care and Treatment by Doctors: A review of the literature. ... Vol 48, No 5 (2006), Breast cancer – early detection and screening in South African women from the ...

  13. Browse Title Index

    African Journals Online (AJOL)

    Issue, Title. Vol 23, No 2 (2011), Dynamique foliaire et croissance du maïs: Application du modèle «STICS» en conditions tropicales en RD-Congo, Abstract PDF. MM Lufuluabo, RV Kizungu, KK Nkongolo. Vol 18, No 1 (2006), Dynamique spatio-temporelle des populations d\\'Altises Podagrica spp. (Coleoptera ...

  14. Browse Title Index

    African Journals Online (AJOL)

    Items 251 - 300 of 2005 ... Issue, Title. Vol 92, No 4 (2015), Blood Pressure and Obesity Index Assessment in a Typical Urban Slum in Enugu, Nigeria, Abstract. GI Ahaneku, CU Osuji, OC Oguejiofor, BC Anisiuba, VO Ikeh, JE Ahaneku. Vol 80, No 10 (2003):, Blood pressure control in a population where antihypertensives are ...

  15. Browse Title Index

    African Journals Online (AJOL)

    Items 201 - 250 of 661 ... Journal Home > Advanced Search > Browse Title Index. Log in or Register to get access to full text downloads. .... A El-Mahdy, B Bolduc, J Upadhyay, R Shoukr, A Khoury. Vol 19, No 1 (2013), Factors affecting lower calyceal stone clearance after Extracorporeal shock wave lithotripsy, Abstract PDF.

  16. Browse Title Index

    African Journals Online (AJOL)

    Items 101 - 150 of 985 ... Journal Home > Advanced Search > Browse Title Index ... Vol 17 (2010), Alternating Direction Implicit Finite Difference Time Domain Acoustic Wave Algorithm, Abstract. E Ikata .... Vol 17 (2010), Analytic derivation of the wave profile and phase speed of sixth order Stokes waves in deep water, Abstract.

  17. Browse Title Index

    African Journals Online (AJOL)

    Items 351 - 400 of 979 ... Issue, Title. Vol 45, No 9 (2003), Erectile dysfunction: A GP's guide to clinical assessment, Abstract PDF. PJ Harden. Vol 47, No 4 (2005), Ethical Issues in Family Practice: My Culture – Right or Wrong? Abstract PDF. GA Ogunbanjo, D Knapp van Bogaert. Vol 59, No 3 (2017), Ethical issues with ...

  18. Browse Title Index

    African Journals Online (AJOL)

    Items 301 - 350 of 745 ... Issue, Title. Vol 9, No 3 (1999), Frequency And Outcome In AIDS Patients In A University Teaching Hospital – A Five Year Review, Abstract. SA Ogun, OO Adelowo, AEA ... Vol 18, No 2 (2008), Good cllinical practice in clinical drug trials - What you need to know, Abstract. K Soyebi, Y Abosede, HAB ...

  19. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 50 of 217 ... Browse Title Index. Journal Home > Advanced ... Vol 13, No 1 (2016), Access to specialized surgical care, Abstract PDF. H Saidi ... Vol 9, No 2 (2012), Clinical Assessment of the Palmaris Longus – Accuracy of common tests, Abstract PDF ... Vol 11, No 2 (2014), Clinical trials in Surgery, Abstract PDF.

  20. Browse Title Index

    African Journals Online (AJOL)

    Items 151 - 200 of 633 ... Issue, Title. Vol 19, No 1 (2009), Delays in Tuberculosis Treatment and Associated Factors in Jimma Zone, Southwest Ethiopia, Abstract PDF. Ayalew Tegegn, Meseret Yazachew. Vol 26, No 1 (2016), Delivery Site Preferences and Associated Factors among Married Women of Child Bearing Age in ...

  1. Browse Title Index

    African Journals Online (AJOL)

    Items 151 - 200 of 4119 ... Issue, Title. Vol 86, No 2 (1996), A re-evaluation of isotope screening for skeletal metastases in nodenegative breast cancer, Abstract PDF. C.A. Gudgeon, I.D. Werner, D.M. Dent. Vol 104, No 6 (2014), A reflection on the South African Medical Association – past, present and future, Abstract PDF.

  2. Browse Title Index

    African Journals Online (AJOL)

    Items 201 - 250 of 1006 ... Issue, Title. Vol 49, No 8 (2007), Clinical approach to a patient with abnormal uterine bleeding, Abstract PDF. B G Lindeque. Vol 57, No 5 (2015), Clinical evidence in the management of swimmer's ear, Abstract PDF. Andre Marais. Vol 50, No 1 (2008), Clinical features of Systemic Lupus ...

  3. Browse Title Index

    African Journals Online (AJOL)

    Items 701 - 750 of 1010 ... Issue, Title. Vol 6, No 2 (1998), Performance et stabilité de rendement des génotypes de patate douce dans divers environnements à l'est du Congo, Abstract. P Phemba, T Mutombo, N B Lutaladio, E E Carey. Vol 22 (2014): Supplement, Performance of Artemia shell-free embryos, Moina micrura and ...

  4. Browse Title Index

    African Journals Online (AJOL)

    Issue, Title. Vol 17 (2005), A. C. conduction behaviour in amorphous WO3/CEO2 thin film, Abstract. B Yagoubi, C A Hogarth, A Boukorrt. Vol 16 (2003), A lossless image compression algorithm using variable block size segmentation, Abstract. Z Brahimi, K A Saadi, N Baraka. Vol 15 (2003), Analysis method of wavelet ...

  5. Browse Title Index

    African Journals Online (AJOL)

    Items 51 - 97 of 97 ... Journal Home > Advanced Search > Browse Title Index ... Vol 20, No 2 (2008), Research Note: Anthropometric data of the foot of ... Vol 26, No 1 (2014), Validation of the Automation Attitude Questionnaire for Airline Pilots ...

  6. Titles of Midas

    Directory of Open Access Journals (Sweden)

    G. L. Huxley

    2001-09-01

    Full Text Available The Phrygian inscription on the tomb at Yazılıkaya (8th century gives Midas the titles wanax and lawagtas, paralled in Mycenaean, and there were strong connections between his dynasty and Greek Aeolis.

  7. Browse Title Index

    African Journals Online (AJOL)

    Items 201 - 250 of 333 ... Issue, Title. Vol 15, No 1 (2016), Irrigation potential of Inuakpa in Odukpani local government of Cross river using Kostiakov model, Abstract PDF. B.O. Unuigbe, K.I. Ofem, N.R.B. Antigha. Vol 2, No 2 (2003), LABOUR USE IN SMALL-SCALE YAM PRODUCTION IN QUA'AN PAN LOCAL GOVERNMENT ...

  8. Browse Title Index

    African Journals Online (AJOL)

    Items 51 - 100 of 644 ... Issue, Title. Vol 19, No 2 (2007), A qualitative study of medical student socialization in Malawi\\'s College of Medicine: Clincal crisis and beyond, Abstract PDF. C Wendland, C Bandawe. Vol 19, No 2 (2007), A qualitative study of medical student socialization in Malawi\\'s College of Medicine: Preclinical ...

  9. Browse Title Index

    African Journals Online (AJOL)

    Issue, Title. Vol 13, No 2 (2013), Using Mindfulness as a Teaching Aid for Phenomenology, Abstract PDF. IR Owen. Vol 8, No 1 (2008), Were Nietzsche's Cardinal Ideas – Delusions? Abstract PDF. Eva M Cybulska. Vol 12, No 1 (2012), What did you learn in school today? Abstract PDF. Carina Henriksson. Vol 5, No 1 (2005) ...

  10. Browse Title Index

    African Journals Online (AJOL)

    Items 51 - 100 of 265 ... Issue, Title. Vol 35, No 2 (2008), Choice of place for childbirth: prevalence and correlates of utilization of health facilities in Chongwe district, Zambia, Abstract PDF. AN Hazemba, S Siziya. Vol 43, No 1 (2016), Clinical and Radiological Features of Multiple Myeloma Patients at the University Teaching ...

  11. Browse Title Index

    African Journals Online (AJOL)

    Issue, Title. Vol 88, No 8 (1998), New birth and death registration forms - a foundation for the future, a challenge for health workers? Abstract PDF. Debbie Bradshaw, Danuta Kielkowski, Freddy Sitas. Vol 83, No 3 (1993), New estimates of infant and child mortality for blacks in South Africa, 1968-1979, Abstract PDF.

  12. Browse Title Index

    African Journals Online (AJOL)

    Items 151 - 200 of 643 ... Issue, Title. Vol 18, No 2 (2015), Contraceptive Knowledge and Compliance with Guidelines for Providing Contraceptive Services by Patent Medicine Vendors In Ibadan North Local Government Area, Nigeria, Abstract PDF. OO Ajayi, AJ Ajuwon. Vol 16, No 2 (2013), Coping Strategy for Food Security ...

  13. Browse Title Index

    African Journals Online (AJOL)

    Items 851 - 900 of 1006 ... Issue, Title. Vol 54, No 2 (2012), The effect of the introduction of a standard monitoring protocol on the investigations performed on the metabolic control of type 2 diabetes at Addington Hospital Medical Outpatients Department, Durban, South Africa, Abstract PDF. JM Gill, A Ross, F Pirie, ...

  14. Browse Title Index

    African Journals Online (AJOL)

    Issue, Title. Vol 8, No 2 (2016): Supplement, Using operative models (ICF and CBR) within an interprofessional context to address community needs, Abstract PDF. A Rhoda, F Waggie, G.C. Filies, J.M. Frantz. Vol 2, No 1 (2010), Using portfolios to assess professional competence and development in medical laboratory ...

  15. Browse Title Index

    African Journals Online (AJOL)

    Items 51 - 100 of 412 ... Issue, Title. Vol 30, No 3 (2011) ... Transferring the principle of double effect from war to business, Abstract. G. J. Rossouw ... Vol 22, No 2 (2003), Can more business ethics teaching halt corruption in companies? Abstract.

  16. Browse Title Index

    African Journals Online (AJOL)

    Items 101 - 150 of 155 ... Issue, Title. Vol 12 (2012), Political Dissent and Autonomy in Wum Local Government, Southern (West) Cameroons, 1957 – 1968, Abstract. TP Mbeum. Vol 9 (2009), Post-Emancipation Slave Commerce: Increasing Child Slave Trafficking and Women's Agency in Late Nineteenth-century Ghana ...

  17. Browse Title Index

    African Journals Online (AJOL)

    Items 451 - 500 of 581 ... Issue, Title. Vol 30, No 1 (2016), Risky sexual behaviour and associated factors among students of Debre Tabor University, Northwest Ethiopia: a cross-sectional study, Abstract PDF. Awoke Derbie, Mekonnen Assefa, Daniel Mekonnen, Fantahun Biadglegne. Vol 28, No 1 (2014), Road traffic accident: ...

  18. Browse Title Index

    African Journals Online (AJOL)

    Items 451 - 500 of 1346 ... Issue, Title. Vol 32, No 1 (2015), Fire and the dynamics of two unpalatable grass species (Cymbopogon pospischilii and Elionurus muticus) in a semi-arid climate, Abstract. Hennie A Snyman. Vol 8, No 1 (1973), Fire as a method of controlling macchia (Fynos) vegetation on the Amathole Mountains of ...

  19. Browse Title Index

    African Journals Online (AJOL)

    Issue, Title. Vol 43, No 2 (2006), Review: "'n Wonderlike geweld. Jeugherinneringe", By Elsa Joubert (2005), Abstract PDF. Henriette Roos. Vol 53, No 1 (2016), Review: Breyten Breytenbach, A Monologue in Two Voices, Abstract PDF. Andy Carolin. Vol 53, No 1 (2016), Review: The Shadow of the Hummingbird, Abstract ...

  20. Browse Title Index

    African Journals Online (AJOL)

    Items 51 - 100 of 103 ... Issue, Title ... SE Edusah, E Osei-Tutu ... Vol 6, No 2 (2016), Interrelationships among unemployment, inflation and economic growth in Nigeria, Abstract .... Vol 4, No 3 (2014): Special Edition, Socio-cultural Issues for ...

  1. Browse Title Index

    African Journals Online (AJOL)

    Items 4351 - 4386 of 4386 ... Issue, Title. Vol 107, No 6 (2017), When students become patients: TB disease among medical undergraduates in Cape Town, South Africa, Abstract PDF. H van der Westhuizen, A Dramowski. Vol 106, No 4 (2016), Where do children die and what are the causes? Under-5 deaths in the Metro West ...

  2. Browse Title Index

    African Journals Online (AJOL)

    Issue, Title. Vol 10, No 2 (2014), Sorindeia warneckei Engl. (Anacardiaceae), une espèce multi-usagère de la dépression de la Lama au Togo, Abstract PDF. A Akodewou, S Akpavi, M Dourma, K Batawila, KB Amegnaglo, W Atakpama, K Akpagama. Vol 10, No 1 (2014), Sterculia setigera Del.: influence de quelques ...

  3. Browse Title Index

    African Journals Online (AJOL)

    Items 1 - 50 of 126 ... Issue, Title. Vol 8, No 2 (2016), 2010 FIFA World Cup stadium investment: Does the post-event usage justify the expenditure? Abstract PDF. Luke Humphrey, Gavin Fraser. Vol 6, No 1 (2014), 7Implication of mergers and acquisitions on stock returns before and during the 2007–2009 credit crunch: An ...

  4. Data Management Challenges in a National Scientific Program of 55 Diverse Research Projects

    Science.gov (United States)

    De Bruin, T.

    2016-12-01

    In 2007-2015, the Dutch funding agency NWO funded the National Ocean and Coastal Research Program (in Dutch: ZKO). This program focused on `the scientific analysis of five societal challenges related to a sustainable use of the sea and coastal zones'. These five challenges were safety, economic yield, nature, spatial planning & development and water quality. The ZKO program was `set up to strengthen the cohesion and collaboration within Dutch marine research'. From the start of the program, data management was addressed, to allow data to be shared amongst the, diverse, research projects. The ZKO program was divided in 4 different themes (or regions). The `Carrying Capacity' theme was subdivided into 3 `research lines': Carrying capacity (Wadden Sea) - Policy-relevant Research - Monitoring - Hypothesis-driven Research Oceans North Sea Transnational Wadden Sea Research 56 Projects were funded, ranging from studies on the governance of the Wadden Sea to expeditions studying trace elements in the Atlantic Ocean. One of the first projects to be funded was the data management project. Its objectives were to allow data exchange between projects, to archive all relevant data from all ZKO projects and to make the data and publications publicly available, following the ZKO Data Policy. This project was carried out by the NIOZ Data Management Group. It turned out that the research projects had hardly any interest in sharing data between projects and had good (?) arguments not to share data at all until the end of the projects. A data portal was built, to host and make available all ZKO data and publications. When it came to submitting the data to this portal, most projects obliged willingly, though found it occasionally difficult to find time to do so. However, some projects refused to submit data to an open data portal, despite the rules set up by the funding agency and agreed by all. The take-home message of this presentation is that data sharing is a cultural and

  5. Seismic safety margins research program. Project VIII load combination project: work plan

    International Nuclear Information System (INIS)

    Chou, C.K.; Vepa, K.; George, L.; Smith, P.D.

    1979-01-01

    The proposed load combination project has the following overall objectives: develop a methodology for appropriate combination of dynamic loads for nuclear power plants under normal plant operation, transients, accidents, and natural hazards; establish design criteria, load factors, and component service levels for appropriate combinations of dynamic loads or responses to be used in nuclear power plant design; determine the reliability of typical piping systems, both inside and outside the containment structure, and provide the NRC with a sound technical basis for defining the criteria for postulating pipe breaks; and determine the probabilities of a large LOCA induced directly and indirectly by a range of earthquakes

  6. Evaluation of the Benefits Attributable to Automotive Lightweight Materials Program Research and Development Projects; TOPICAL

    International Nuclear Information System (INIS)

    Das, S

    2001-01-01

    The purpose of this project is to identify and test methods appropriate for estimating the benefits attributable to research and development (R and D) projects funded by the Automotive Lightweight Materials (ALM) Program of the Office of Advanced Automotive Technologies (OAAT) of the U.S. Department of Energy (DOE). Funded projects range from basic materials science research to applied research in production environments. Collaborators on these projects include national laboratories, universities, and private sector firms, such as leading automobile manufacturers and their suppliers. Three ALM R and D projects were chosen for this pilot evaluation: Low-Cost, Continuous Cast Aluminum Sheet; Advanced Forming Technologies for Aluminum; and Manufacturing of Composite Automotive Structures. These projects were chosen because they represent a range of benefits evaluation situations. The first project resulted in an improved process that may be commercialized. The second project is on going and has two distinct components. The third project has yielded an improved technology that has been commercialized. This completed project also benefited from numerous complementary projects

  7. Regulatory research and support program for 1993/1994 - project descriptions

    International Nuclear Information System (INIS)

    1993-01-01

    The Regulatory Research and Support Program (RSP) is intended to augment and extend the Atomic Energy Control Board's regulatory program beyond the capability of in-house resources. The overall objective of the research and support program is to produce pertinent and independent information that will assist the Board and its staff in making sound, timely and credible decisions on regulating nuclear facilities and materials. The program is divided into nine main areas of research (mission objects) covering the safety of nuclear facilities, radioactive waste management, health physics, physical security, the development of regulatory processes, and special services. In addition, for the first time in this year's program, sub-programs (collections of related projects) have been organized in some areas of study; these sub-programs may cut across several mission objects. More sub-programs will be introduced in future years. A total of 96 projects are planned for 1993/94, including a number which are ongoing from the previous fiscal year. Projects that are held in reserve in case funding becomes available are also listed and provisionally ranked. The spending estimates for the RSP were calculated on the basis of an expected budget of $3.85 M

  8. Regulatory research and support program for 1993/1994 - project descriptions

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-01

    The Regulatory Research and Support Program (RSP) is intended to augment and extend the Atomic Energy Control Board`s regulatory program beyond the capability of in-house resources. The overall objective of the research and support program is to produce pertinent and independent information that will assist the Board and its staff in making sound, timely and credible decisions on regulating nuclear facilities and materials. The program is divided into nine main areas of research (mission objects) covering the safety of nuclear facilities, radioactive waste management, health physics, physical security, the development of regulatory processes, and special services. In addition, for the first time in this year`s program, sub-programs (collections of related projects) have been organized in some areas of study; these sub-programs may cut across several mission objects. More sub-programs will be introduced in future years. A total of 96 projects are planned for 1993/94, including a number which are ongoing from the previous fiscal year. Projects that are held in reserve in case funding becomes available are also listed and provisionally ranked. The spending estimates for the RSP were calculated on the basis of an expected budget of $3.85 M.

  9. Barriers to Implementing the ACGME Outcome Project: A Systematic Review of Program Director Surveys.

    Science.gov (United States)

    Malik, Mohammad U; Diaz Voss Varela, David A; Stewart, Charles M; Laeeq, Kulsoom; Yenokyan, Gayane; Francis, Howard W; Bhatti, Nasir I

    2012-12-01

    The Accreditation Council for Graduate Medical Education (ACGME) introduced the Outcome Project in July 2001 to improve the quality of resident education through competency-based learning. The purpose of this systematic review is to determine and explore the perceptions of program directors regarding challenges to implementing the ACGME Outcome Project. We used the PubMed and Web of Science databases and bibliographies for English-language articles published between January 1, 2001, and February 17, 2012. Studies were included if they described program directors' opinions on (1) barriers encountered when attempting to implement ACGME competency-based education, and (2) assessment methods that each residency program was using to implement competency-based education. Articles meeting the inclusion criteria were screened by 2 researchers. The grading criterion was created by the authors and used to assess the quality of each study. The survey-based data reported the opinions of 1076 program directors. Barriers that were encountered include: (1) lack of time; (2) lack of faculty support; (3) resistance of residents to the Outcome Project; (4) insufficient funding; (5) perceived low priority for the Outcome Project; (6) inadequate salary incentive; and (7) inadequate knowledge of the competencies. Of the 6 competencies, those pertaining to patient care and medical knowledge received the most responses from program directors and were given highest priority. The reviewed literature revealed that time and financial constraints were the most important barriers encountered when implementing the ACGME Outcome Project.

  10. A Program Applying Professional Safety Basics in Construction Projects

    Directory of Open Access Journals (Sweden)

    Entisar Kadhim Rasheed

    2016-04-01

    Full Text Available When industrial and constructional renaissance started in the world, the great interest was going on towards the equipment’s, which was the first mean for production. After industry was settled the interest was going on towards the men ship which manpower on which the production depends. It was approved that it represents the basic part in all of the processes and the protection of those individuals against dangers of these equipment’s, industry and its accidents was the basic things which was studied in many researches until it crystallized in general principles for all industries and other take care in each industry. The professional safety is concerned as restrict which aims to take care of humanitarian and material principles also to raise the production of these principles, in the aspect of safety, health and providing the suitable healthy condition to the worker so he can feel safety, confidence and sociological settle, this will increase the production. So In order to maintain the manpower of business risks and to enable them to fulfill their role better to increase production and improve the quality and maintain the machine and supporting the national economy and keep pace with industrial developments and technological came the idea of research to focus on the importance of studying the subject of occupational safety by conducting a field survey to see the reality of professional safety in the relevant departments and work sites and through a questionnaire on the subject and conduct personal interviews with those concerned in this area and to prepare a program for the application of professional safety for each resource (labor, machines, materials, money in construction sites and departments concerned.

  11. Final technical report for project titled Quantitative Characterization of Cell Aggregation/Adhesion as Predictor for Distribution and Transport of Microorganisms in Subsurface Environment

    Energy Technology Data Exchange (ETDEWEB)

    Gu, April Z. [Northeastern Univ., Boston, MA (United States); Wan, Kai-tak [Northeastern Univ., Boston, MA (United States)

    2014-09-02

    This project aims to explore and develop enabling methodology and techniques for nano-scale characterization of microbe cell surface contact mechanics, interactions and adhesion quantities that allow for identification and quantification of indicative properties related to microorganism migration and transport behavior in porous media and in subsurface environments. Microbe transport has wide impact and therefore is of great interest in various environmental applications such as in situ or enhanced subsurface bioremediation,filtration processes for water and wastewater treatments and protection of drinking water supplies. Although great progress has been made towards understanding the identities and activities of these microorganisms in the subsurface, to date, little is known of the mechanisms that govern the mobility and transport of microorganisms in DOE’s contaminated sites, making the outcomes of in situ natural attenuation or contaminant stability enhancement unpredictable. Conventionally, movement of microorganisms was believed to follows the rules governing solute (particle) transport. However, recent studies revealed that cell surface properties, especially those pertaining to cell attachment/adhesion and aggregation behavior, can cause the microbe behavior to deviate from non-viable particles and hence greatly influence the mobility and distribution of microorganisms in porous media.This complexity highlights the need to obtain detailed information of cell-cell and cell-surface interactions in order to improve and refine the conceptual and quantitative model development for fate and transport of microorganisms and contaminant in subsurface. Traditional cell surface characterization methods are not sufficient to fully predict the deposition rates and transport behaviors of microorganism observed. A breakthrough of methodology that would allow for quantitative and molecular-level description of intrinsic cell surface properties indicative for cell

  12. Regulatory research program for 1986/87 project descriptions. Information bulletin 86-1

    International Nuclear Information System (INIS)

    1986-01-01

    The regulatory research program is intended to augment and extend the Atomic Energy Control Board's regulatory program beyond the capability of in-house resources. The overall objective of the research program is to produce pertinent and independent information that will assist the Board and its staff in making correct, timely and credible decisions on regulating nuclear energy. The program is divided into ten main areas of research covering the safety of nuclear facilities, radioactive waste management, health physics, physical security and the development of regulatory processes. A total of 92 projects are planned for 1986/87, including a number which are ongoing from the previous fiscal year

  13. Regulatory research program for 1986/87 project descriptions. Information bulletin 86-1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-07-08

    The regulatory research program is intended to augment and extend the Atomic Energy Control Board`s regulatory program beyond the capability of in-house resources. The overall objective of the research program is to produce pertinent and independent information that will assist the Board and its staff in making correct, timely and credible decisions on regulating nuclear energy. The program is divided into ten main areas of research covering the safety of nuclear facilities, radioactive waste management, health physics, physical security and the development of regulatory processes. A total of 92 projects are planned for 1986/87, including a number which are ongoing from the previous fiscal year.

  14. Wyoming coal-conversion project. Final technical report, November 1980-February 1982. [Proposed WyCoalGas project, Converse County, Wyoming; contains list of appendices with title and identification

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    This final technical report describes what WyCoalGas, Inc. and its subcontractors accomplished in resolving issues related to the resource, technology, economic, environmental, socioeconomic, and governmental requirements affecting a project located near Douglas, Wyoming for producing 150 Billion Btu per day by gasifying sub-bituminous coal. The report summarizes the results of the work on each task and includes the deliverables that WyCoalGas, Inc. and the subcontractors prepared. The co-venturers withdrew from the project for two reasons: federal financial assistance to the project was seen to be highly uncertain; and funds were being expended at an unacceptably high rate.

  15. Computer programs for display. [magnetic tapes - project planning/NASA programs

    Science.gov (United States)

    1975-01-01

    The developments of an information storage and retrieval system are presented. Computer programs used in the system are described; the programs allow display messages to be placed on disks in an off-line environment permitting a more efficient use of memory. A time table that shows complete and scheduled developments of the system is given.

  16. Spent Nuclear Fuel Project document control and Records Management Program Description

    International Nuclear Information System (INIS)

    MARTIN, B.M.

    2000-01-01

    The Spent Nuclear Fuel (SNF) Project document control and records management program, as defined within this document, is based on a broad spectrum of regulatory requirements, Department of Energy (DOE) and Project Hanford and SNF Project-specific direction and guidance. The SNF Project Execution Plan, HNF-3552, requires the control of documents and management of records under the auspices of configuration control, conduct of operations, training, quality assurance, work control, records management, data management, engineering and design control, operational readiness review, and project management and turnover. Implementation of the controls, systems, and processes necessary to ensure compliance with applicable requirements is facilitated through plans, directives, and procedures within the Project Hanford Management System (PHMS) and the SNF Project internal technical and administrative procedures systems. The documents cited within this document are those which directly establish or define the SNF Project document control and records management program. There are many peripheral documents that establish requirements and provide direction pertinent to managing specific types of documents that, for the sake of brevity and clarity, are not cited within this document

  17. Project H.O.P.E.: Effective University Engagement with Community Afterschool Programs

    Directory of Open Access Journals (Sweden)

    Barbara C. Jentleson

    2009-09-01

    Full Text Available Implemented in 2002 by the Duke-Durham Neighborhood Partnership, Project H.O.P.E. has improved the quantity and quality of afterschool programs for the youth of Durham, NC. Project H.O.P.E. provides tutoring programs, enrichment resources, and evaluation support to non-profit community partner organizations located in the low income Durham neighborhoods surrounding Duke University. Duke University undergraduates who provide tutoring services to the Durham youth in the afterschool programs gain from valuable reciprocal service learning experiences. Project H.O.P.E. is an effective model of the mutual benefits that can be gained from effective university and community engagement in the service of at-risk students.

  18. PREPS2 - a PC-based computer program for performing economic analysis of capital projects

    International Nuclear Information System (INIS)

    Blake, M.W.; Brand, D.O.; Chastain, E.T.; Johnson, E.D.

    1990-01-01

    In these times of increased spending to finance new capacity and to meet clean air act legislation, many electric utilities are giving a high priority to controlling capital expenditures at existing generating facilities. Determining the level of capital expenditures which are economically justified is very difficult; units which have higher capacity factors are worth more to the utility. Therefore, the utility can more readily justify higher capital expenditures to improve or maintain reliability and heat rate than on units with lower capacity factors. This paper describes a PC-based computer program (PREPS2) which performs an economic analysis of individual capital projects. The program incorporates tables which describe the worth to the system of making improvements in each unit. This computer program is currently being used by the six Southern Company operating companies to evaluate all production capital projects over $50,000. Approximately 500 projects representing about $300 million are being analyzed each year

  19. [HIV prevention program for young people--the WYSH Project as a model of "combination prevention"].

    Science.gov (United States)

    Ono-Kihara, Masako

    2010-03-01

    In face of the HIV pandemic that still grows, unsuccessful efforts of developing biomedical control measures or the failure of cognitive-behavioral approach to show sustained social level effectiveness, behavioral strategy is now expected to evolve into a structural prevention ("combination prevention") that involves multiple behavioral goals and multilevel approaches. WYSH Project is a combination prevention project for youth developed through socio-epidemiological approach that integrates epidemiology with social science such as social marketing and mixed method. WYSH Project includes mass education programs for youth in schools and programs for out-of-school youth through cyber network and peer communication. Started in 2002, it expanded nationwide with supports from related ministries and parent-teacher associations and has grown into a single largest youth prevention project in Japan.

  20. The Feed Materials Program of the Manhattan Project: A Foundational Component of the Nuclear Weapons Complex

    Science.gov (United States)

    Reed, B. Cameron

    2014-12-01

    The feed materials program of the Manhattan Project was responsible for procuring uranium-bearing ores and materials and processing them into forms suitable for use as source materials for the Project's uranium-enrichment factories and plutonium-producing reactors. This aspect of the Manhattan Project has tended to be overlooked in comparison with the Project's more dramatic accomplishments, but was absolutely vital to the success of those endeavors: without appropriate raw materials and the means to process them, nuclear weapons and much of the subsequent cold war would never have come to pass. Drawing from information available in Manhattan Engineer District Documents, this paper examines the sources and processing of uranium-bearing materials used in making the first nuclear weapons and how the feed materials program became a central foundational component of the postwar nuclear weapons complex.

  1. 34 CFR 379.11 - What additional types of project activities may be authorized under this program?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What additional types of project activities may be... EDUCATION PROJECTS WITH INDUSTRY What Kinds of Activities Does the Department of Education Assist Under This Program? § 379.11 What additional types of project activities may be authorized under this program? The...

  2. A summary of the environmental restoration program retrieval demonstration project at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    McQuary, J.

    1991-02-01

    This report provides a summary of the Environmental Restoration Program's Retrieval Demonstration Project at the Idaho National Engineering Laboratory. This project developed concepts for demonstrating facilities and equipment for the retrieval of buried transuranic mixed waste at the INEL. Included is a brief assessment of the viability, cost effectiveness, and safety of retrieval based on the developed concept. Changes made in Revision 1 reflect editorial changes only. 31 refs., 1 fig

  3. Biotechnology by Design: An Introductory Level, Project-Based, Synthetic Biology Laboratory Program for Undergraduate Students†

    OpenAIRE

    Beach, Dale L.; Alvarez, Consuelo J.

    2015-01-01

    Synthetic biology offers an ideal opportunity to promote undergraduate laboratory courses with research-style projects, immersing students in an inquiry-based program that enhances the experience of the scientific process. We designed a semester-long, project-based laboratory curriculum using synthetic biology principles to develop a novel sensory device. Students develop subject matter knowledge of molecular genetics and practical skills relevant to molecular biology, recombinant DNA techniq...

  4. Making continental-scale environmental programs relevant locally for educators with Project BudBurst

    Science.gov (United States)

    Goehring, L.; Henderson, S.; Wasser, L.; Newman, S. J.; Ward, D.

    2012-12-01

    Project BudBurst is a national citizen science initiative designed to engage non professionals in observations of phenological (plant life cycle) events that raise awareness of climate change, and create a cadre of informed citizen scientists. Citizen science programs such as Project BudBurst provide excellent opportunities for educators and their students to actively participate in scientific research. Such programs are important not only from an educational perspective, but because they also enable scientists to broaden the geographic and temporal scale of their observations. The goals of Project BudBurst are to 1) increase awareness of phenology as an area of scientific study; 2) increase awareness of the impacts of changing climates on plants at a continental-scale; and 3) increase science literacy by engaging participants in the scientific process. From its 2008 launch, this on-line program has engaged participants of all ages and walks of life in recording the timing of the leafing and flowering of wild and cultivated species found across the continent, and in contemplating the meaning of such data in their local environments. Thus far, thousands of participants from all 50 states have submitted data. This presentation will provide an overview of Project BudBurst educational resources and share lessons learned from educators in implementing the program in formal and informal education settings. Lesson plans and tips from educators will be highlighted. Project BudBurst is co-managed by the National Ecological Observatory Network and the Chicago Botanic Garden.

  5. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  6. NASA Small Business Innovation Research Program. Composite List of Projects, 1983 to 1989

    Science.gov (United States)

    1990-01-01

    The NASA SBIR Composite List of Projects, 1983 to 1989, includes all projects that have been selected for support by the Small Business Innovation Research (SBIR) Program of NASA. The list describes 1232 Phase 1 and 510 Phase 2 contracts that had been awarded or were in negotiation for award in August 1990. The main body is organized alphabetically by name of the small businesses. Four indexes cross-reference the list. The objective of this listing is to provide information about the SBIR program to anyone concerned with NASA research and development activities.

  7. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    International Nuclear Information System (INIS)

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE's overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program

  8. 24 CFR 232.595 - Eligibility of title.

    Science.gov (United States)

    2010-04-01

    ... URBAN DEVELOPMENT MORTGAGE AND LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED... Fire Safety Equipment Title § 232.595 Eligibility of title. In order for the property which is to be...

  9. Pocketguide to Title XX: Social Services to Children & Youth.

    Science.gov (United States)

    Mueller, Candace

    This brief guide to Title XX contains the following chapter headings: (1) Historical Overview of the Social Services Program, (2) The Provisions of Title XX at a Glance, (3) Implications for Services to Children and Youth, (4) The Planning Process, (5) Publication of the Proposed Plan and the Public Comment Period, (6) After the Final Plan is…

  10. Hawaii energy strategy project 3: Renewable energy resource assessment and development program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    RLA Consulting (RLA) has been retained by the State of Hawaii Department of Business, Economic Development and Tourism (DBEDT) to conduct a Renewable Energy Resource Assessment and Development Program. This three-phase program is part of the Hawaii Energy Strategy (HES), which is a multi-faceted program intended to produce an integrated energy strategy for the State of Hawaii. The purpose of Phase 1 of the project, Development of a Renewable Energy Resource Assessment Plan, is to better define the most promising potential renewable energy projects and to establish the most suitable locations for project development in the state. In order to accomplish this goal, RLA has identified constraints and requirements for renewable energy projects from six different renewable energy resources: wind, solar, biomass, hydro, wave, and ocean thermal. These criteria were applied to areas with sufficient resource for commercial development and the results of Phase 1 are lists of projects with the most promising development potential for each of the technologies under consideration. Consideration of geothermal energy was added to this investigation under a separate contract with DBEDT. In addition to the project lists, a monitoring plan was developed with recommended locations and a data collection methodology for obtaining additional wind and solar data. This report summarizes the results of Phase 1. 11 figs., 22 tabs.

  11. Compartiendo Culturas/Sharing Cultures: A Title VII Two-Way Bilingual Program at Herod Elementary School 1995-96. Research Report on Educational Grants.

    Science.gov (United States)

    Houston Independent School District, TX. Dept. of Research and Evaluation.

    This report describes a program that was designed to end the isolation typically experienced by language minority students in traditional bilingual education and to provide language majority students the opportunity to acquire proficiency in a second Language. The program served 4 classes of approximately 22 students each (85 students) in…

  12. Programs for Children with Specific Learning Disabilities. P.L. 91-230, Title VI-G Formal Final Evaluation. (Statistical Analysis of Data).

    Science.gov (United States)

    Murphy, Philip J.

    The paper reports the final evaluation of a program for approximately 143 learning disabled (LD) students (grades 6-to-12) from six school districts. A number of test instruments were used to evaluate student progress during the program, including the Wide Range Achievement Test (WRAT), the Durrell Analysis of Reading Difficulty, and the…

  13. EMF Rapid Program Engineering Projects, Project 1, Development of Recommendations for Guidelines for Field Source Measurement

    Energy Technology Data Exchange (ETDEWEB)

    Electric Research and Management, Inc.

    1997-03-11

    The goal of this project is to develop a protocol for measuring the electric and magnetic fields around sources. Data from these measurements may help direct future biological effects research by better defining the complexity of magnetic and electric fields to which humanity is exposed, as well asprovide the basis for rigorous field exposure analysis and risk assessment once the relationship between field exposure and biological response. is better understood. The data base also should have sufficient spatial and temporal characteristics to guide electric and magnetic field management. The goal of Task A is to construct a set of characteristics that would be ideal to have for guiding and interpreting biological studies and for focusing any future effort at field management. This ideal set will then be quantified and reduced according to the availability (or possible development of) instrumentation to measure the desired characteristics. Factors that also will be used to define pragmatic data sets will be the cost of collecting the data, the cost of developing an adequate data base, and the needed precision in measuring specific characteristics. A field, electric or magnetic, will always be ,some function of time and space. The first step in this section of the protocol development will be to determine what span of time and what portion of space are required to quantify the electric and magnetic fields around sources such as appliances and electrical apparatus. Constraints on time will be set by examining measurement limitations and biological data requirements.

  14. 75 FR 1408 - Pick-Sloan Missouri Basin Program, Eastern and Western Division Proposed Project Use Power Rate

    Science.gov (United States)

    2010-01-11

    ... of Proposed Pick-Sloan Missouri Basin Program, Eastern and Western Divisions, Project Use Power Rate...) for Project Use Power for the Pick-Sloan Missouri Basin Program (P-SMBP), Eastern and Western... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Pick-Sloan Missouri Basin Program, Eastern and...

  15. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1993 Quality Program status report

    International Nuclear Information System (INIS)

    Boliver, S.L.

    1995-05-01

    This status report is for calendar year 1993. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory (Los Alamos) Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, we establish a baseline that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify long term trends and to evaluate improvements. This is the third annual status report (Bolivar, 1992; Bolivar, 1994). This report is divided into two primary sections: Program Activities and Trend Analysis. Under Program Activities, programmatic issues occurring in 1993 are discussed. The goals for 1993 are also listed, followed by a discussion of their status. Lastly, goals for 1994 are identified. The Trend Analysis section is a summary of 1993 quarterly trend reports and provides a good overview of the quality assurance issues of the Los Alamos YMP

  16. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1993 Quality Program status report

    Energy Technology Data Exchange (ETDEWEB)

    Bolivar, S.L.

    1995-05-01

    This status report is for calendar year 1993. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory (Los Alamos) Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, we establish a baseline that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify long term trends and to evaluate improvements. This is the third annual status report (Bolivar, 1992; Bolivar, 1994). This report is divided into two primary sections: Program Activities and Trend Analysis. Under Program Activities, programmatic issues occurring in 1993 are discussed. The goals for 1993 are also listed, followed by a discussion of their status. Lastly, goals for 1994 are identified. The Trend Analysis section is a summary of 1993 quarterly trend reports and provides a good overview of the quality assurance issues of the Los Alamos YMP.

  17. Core Activities Program. TMI-2 Core Receipt and Storage Project Plan

    International Nuclear Information System (INIS)

    Ayers, A.L. Jr.

    1984-12-01

    The TMI-2 Core Receipt and Storage Project is funded by the US Department of Energy and managed by the Technical Support Branch of EG and G Idaho, Inc. at the Idaho National Engineering Laboratory (INEL). As part of the Core Activities Program, this project will include: (a) preparations for receipt and storage of the Three Mile Island Unit 2 core debris at INEL; and (b) receipt and storage operations. This document outlines procedures; project management; safety, environment, and quality; safeguards and security; deliverables; and cost and schedule for the receipt and storage activities at INEL

  18. Uranium Mill Tailings remedial action project waste minimization and pollution prevention awareness program plan

    International Nuclear Information System (INIS)

    1994-07-01

    The purpose of this plan is to establish a waste minimization and pollution prevention awareness (WM/PPA) program for the U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The program satisfies DOE requirements mandated by DOE Order 5400.1. This plan establishes planning objectives and strategies for conserving resources and reducing the quantity and toxicity of wastes and other environmental releases

  19. Continuous, environmental radon monitoring program at the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Liu, N.; Sorensen, C.D.; Tung, C.H.; Orchard, C.R.

    1995-01-01

    A continuous, environmental radon monitoring program has been established in support of the Department of Energy's (DOE) Yucca Mountain Site Characterization Project (YMP). The monitoring program is to characterize the natural radon emissions at the YMP site, to understand the existing radon concentrations in the environmental background, and to assess and control the potential work exposure. Based upon a study of the monitoring results, this paper presents a preliminary understanding of the magnitudes, characteristics, and exposure levels of radon at the YMP site

  20. The Florida Ranchlands Environmental Services Project: Field Testing a Pay-for-Environmental-Services Program

    OpenAIRE

    Lynch, S.; Shabman, L.

    2007-01-01

    The Florida Ranchlands Environmental Services Project (FRESP) was recently launched, which will field test a program to complement the existing restoration programs such as the Lake Okeechobee Protection Plan (LOPP), which uses public funding to build treatment wetlands, drill aquifer storage, and capture rainwater (to delay its arrival downstream). FRESP will pay cattle ranchers to provide environmental services that will benefit the lake. PES-1 (Payments for Environmental Services Associ...