WorldWideScience

Sample records for project timetable work

  1. Exploring Scientists' Working Timetable: A Global Survey

    OpenAIRE

    Wang, Xianwen; Peng, Lian; Zhang, Chunbo; Xu, Shenmeng; Wang, Zhi; Wang, Chuanli; Wang, Xianbing

    2013-01-01

    In our previous study (Wang et al., 2012), we analyzed scientists' working timetable of 3 countries, using realtime downloading data of scientific literatures. In this paper, we make a through analysis about global scientists' working habits. Top 30 countries/territories from Europe, Asia, Australia, North America, Latin America and Africa are selected as representatives and analyzed in detail. Regional differences for scientists' working habits exists in different countries. Besides differen...

  2. Timetable Attractiveness Parameters

    DEFF Research Database (Denmark)

    Schittenhelm, Bernd

    2008-01-01

    Timetable attractiveness is influenced by a set of key parameters that are described in this article. Regarding the superior structure of the timetable, the trend in Europe goes towards periodic regular interval timetables. Regular departures and focus on optimal transfer possibilities make...... these timetables attractive. The travel time in the timetable depends on the characteristics of the infrastructure and rolling stock, the heterogeneity of the planned train traffic and the necessary number of transfers on the passenger’s journey. Planned interdependencies between trains, such as transfers...... and heterogeneous traffic, add complexity to the timetable. The risk of spreading initial delays to other trains and parts of the network increases with the level of timetable complexity....

  3. Creating a common Danish list of railway timetable evaluation criteria and revising the timetabling process accordingly

    DEFF Research Database (Denmark)

    Schittenhelm, Bernd; Landex, Alex

    2012-01-01

    criteria: capacity consumption on line sections and systematic timetable. Rank 2 criteria: robustness of the timetable and societal acceptance of the timetable and rank 3 criteria: travel time of trains and attractive transfer options. With this new tool a revised timetabling process at Rail Net Denmark...... is proposed. The very basic structure of the process cannot be changed due to EU legislation and Rail Net Europe guidelines. Key performance indicators derived from the identified timetabling criteria are introduced. As is a more iterative approach to the timetabling process due to the assumption of major...... improvements within timetable planning systems. This new iterative timetabling process using key performance indicators will result in improved future timetables and in lower levels of disagreement between timetable stakeholders....

  4. A GA Evolving Instructions for a Timetable Builder

    NARCIS (Netherlands)

    Blum, Christian; Correia, Sebastiao; Dorigo, Marco; Paechter, Ben; Rossi-Doria, Olivia; Snoek, M.; Burke, E.; De Causmaecker, P.

    2002-01-01

    In this work we present a Genetic Algorithm for tackling timetabling problems. Our approach uses an indirect solution representation, which denotes a number if instructions for a timetable builder on how to sequentially build a solution. These instructions are composed by a set of predefined

  5. Timetabling at High Schools

    DEFF Research Database (Denmark)

    Sørensen, Matias

    on the publicly available XHSTT format for modeling instances and solutions of the HSTP) and the Danish High School Timetabling Problem (DHSTP). For both problems a complex Mixed-Integer Programming (MIP) model is developed, and in both cases are empirical tests performed on a large number of real-life datasets......High school institutions face a number of important planning problems during each schoolyear. This Ph.D. thesis considers two of these planning problems: The High School Timetabling Problem (HSTP) and the Consultation Timetabling Problem (CTP). Furthermore a framework for handling various planning....... The second part contains the main scienti_c papers composed during the Ph.D. study. The third part of the thesis also contains scienti_c papers, but these are included as an appendix. In the HSTP, the goal is to obtain a timetable for the forthcoming school-year. A timetable consists of lectures scheduled...

  6. A Strategic View of University Timetabling

    DEFF Research Database (Denmark)

    Lindahl, Michael; Mason, Andrew; Stidsen, Thomas Jacob Riis

    2018-01-01

    University Timetabling has traditionally been studied as an operational problem where the goal is to assign lectures to rooms and timeslots and create timetables of high quality for students and teachers. Two other important decision problems arise before this can be solved: what rooms are necess......University Timetabling has traditionally been studied as an operational problem where the goal is to assign lectures to rooms and timeslots and create timetables of high quality for students and teachers. Two other important decision problems arise before this can be solved: what rooms....... The relationship and differences between operational, tactical and strategic timetabling problems are reviewed. Based on the formulation of curriculum-based course timetabling and data from the Second International Timetabling Competition (ITC 2007), three new bi-objective mixed-integer models are formulated. We...

  7. An automatically configured modular algorithm for post enrollment course timetabling

    DEFF Research Database (Denmark)

    Fawcett, Chris; Hoos, Holger; Chiarandini, Marco

    2009-01-01

    Timetabling tasks form a widely studied type of resource scheduling problem, with important real-world applications in schools, universities and other educational settings. In this work, we focus on postenrollment course timetabling, the problem that was covered by Track 2 of the recent 2nd...... International Timetabling Competition (ITC2007). Following an approach that makes strong use of automated exploration of a large design space of modular and highly parameterised stochastic local search algorithms for this problem, we have obtained a solver that achieves consistently better performance than...

  8. Phase synchronization in train connection timetables

    Energy Technology Data Exchange (ETDEWEB)

    Fretter, Christoph; Mueller-Hannemann, Matthias [Martin Luther Universitaet, Halle-Wittenberg (Germany); Krumov, Lachezar; Weihe, Karsten [TU Darmstadt (Germany); Huett, Marc-Thorsten [Jacobs University, Bremen (Germany)

    2010-07-01

    Train connection timetables are an important research topic in algorithmics. Finding optimal or near-optimal timetables under the subsidiary conditions of minimizing travel times and other criteria is an important contribution to the functioning of public transportation. In addition to efficiency (given, e.g. by minimal average travel times), the robustness of the timetable, i.e. a minimization of delay propagation, is an important criterion. Here we study the balance of efficiency and robustness in train connection timetables from the perspective of synchronization, exploiting the fact that a major part of the trains run nearly periodically. We find that synchronization is highest at intermediate-sized stations. We argue that this synchronization perspectives opens a new avenue towards an understanding of train connection timetables by representing them as spatiotemporal phase patterns. Robustness and efficiency can then be viewed as properties of this phase pattern.

  9. Integrating robust timetabling in line plan optimization for railway systems

    DEFF Research Database (Denmark)

    Burggraeve, Sofie; Bull, Simon Henry; Vansteenwegen, Pieter

    2017-01-01

    We propose a heuristic algorithm to build a railway line plan from scratch that minimizes passenger travel time and operator cost and for which a feasible and robust timetable exists. A line planning module and a timetabling module work iteratively and interactively. The line planning module......, but is constrained by limited shunt capacity. While the operator and passenger cost remain close to those of the initially and (for these costs) optimally built line plan, the timetable corresponding to the finally developed robust line plan significantly improves the minimum buffer time, and thus the robustness...... creates an initial line plan. The timetabling module evaluates the line plan and identifies a critical line based on minimum buffer times between train pairs. The line planning module proposes a new line plan in which the time length of the critical line is modified in order to provide more flexibility...

  10. Actividades comunicativas en la clase de Inglés : project work. News about your city

    OpenAIRE

    Valero Garcés, Carmen

    1991-01-01

    In the context of language learning, projects are multiskill activities focusing on topics or themes rather than on specific language targets. Students themselves playa crucial part in the initial choice of subject matter and the decisions related to appropiate working method, the project timetable and the eventual «end product». Project work provides students with opportunities to recycle know language and skills in a relatively natural context because specific language a...

  11. University Course Timetabling using Constraint Programming

    Directory of Open Access Journals (Sweden)

    Hadi Shahmoradi

    2017-03-01

    Full Text Available University course timetabling problem is a challenging and time-consuming task on the overall structure of timetable in every academic environment. The problem deals with many factors such as the number of lessons, classes, teachers, students and working time, and these are influenced by some hard and soft constraints. The aim of solving this problem is to assign courses and classes to teachers and students, so that the restrictions are held. In this paper, a constraint programming method is proposed to satisfy maximum constraints and expectation, in order to address university timetabling problem. For minimizing the penalty of soft constraints, a cost function is introduced and AHP method is used for calculating its coefficients. The proposed model is tested on department of management, University of Isfahan dataset using OPL on the IBM ILOG CPLEX Optimization Studio platform. A statistical analysis has been conducted and shows the performance of the proposed approach in satisfying all hard constraints and also the satisfying degree of the soft constraints is on maximum desirable level. The running time of the model is less than 20 minutes that is significantly better than the non-automated ones.

  12. Mathematical Programming Approaches for Optimal University Timetabling

    DEFF Research Database (Denmark)

    Bagger, Niels-Christian Fink

    Every semester universities are faced with the challenge of creating timetables for the courses. Creating these timetables is an important task to ensure that students can attend the courses they need for their education. Creating timetables that are feasible can be challenging, and when different...... are dedicated to this research field. This thesis considers a University Timetabling problem, more specifically the Curriculumbased Course Timetabling (CTT) problem. The objective of the CTT problem is to assign a set of lectures to time slots and rooms. The literature has focused mainly on heuristic...... applications which are also apparent in the different surveys. The drawback of the heuristics is that they are problem specific and do not provide any information on the quality of the solutions they generate. The objective of this thesis is to minimize the gap between the best-known upper bounds and the best...

  13. Adaptive selection of heuristics for improving exam timetables

    OpenAIRE

    Burke, Edmund; Qu, Rong; Soghier, Amr

    2014-01-01

    This paper presents a hyper-heuristic approach which hybridises low-level heuristic moves to improve timetables. Exams which cause a soft-constraint violation in the timetable are ordered and rescheduled to produce a better timetable. It is observed that both the order in which exams are rescheduled and the heuristic moves used to reschedule the exams and improve the timetable affect the quality of the solution produced. After testing different combinations in a hybrid hyper-heuristic approac...

  14. Quantitative Methods to Evaluate Timetable Attractiveness

    DEFF Research Database (Denmark)

    Schittenhelm, Bernd; Landex, Alex

    2009-01-01

    The article describes how the attractiveness of timetables can be evaluated quantitatively to ensure a consistent evaluation of timetables. Since the different key stakeholders (infrastructure manager, train operating company, customers, and society) have different opinions on what an attractive...

  15. A tutorial on fundamental model structures for railway timetable optimization

    DEFF Research Database (Denmark)

    Harrod, Steven

    2012-01-01

    This guide explains the role of railway timetables relative to all other railway scheduling activities, and then presents four fundamental timetable formulations suitable for optimization. Timetabling models may be classified according to whether they explicitly model the track structure, and whe......This guide explains the role of railway timetables relative to all other railway scheduling activities, and then presents four fundamental timetable formulations suitable for optimization. Timetabling models may be classified according to whether they explicitly model the track structure...

  16. A Comprehensive Study of Educational Timetabling - a Survey

    DEFF Research Database (Denmark)

    Kristiansen, Simon; Stidsen, Thomas Riis

    Educational timetabling is one of the most researched subjects within the range of timetabling problems. There has been a significant increase in effcient planning problems within educational timetabling the last couple of decades. In this paper we will highlight some of the main trends and resea...

  17. Railway Timetable Stability Analysis Using Stochastic Max-Plus Linear Systems

    NARCIS (Netherlands)

    Goverde, R.M.P.; Heidergott, B.; Merlet, G.

    2010-01-01

    Stability and robustness of a railway timetable are essential properties for punctual and reliable operations. Timetable performance evaluation is therefore an important aspect in the timetable design process. In particular, the stability and recoverability properties of a timetable with respect to

  18. Railway timetabling from an operations research

    NARCIS (Netherlands)

    L.G. Kroon (Leo); D. Huisman (Dennis); G. Maróti (Gábor)

    2007-01-01

    textabstractIn this paper we describe Operations Research (OR) models and techniques that can be used for determining (cyclic) railway timetables. We discuss the two aspects of railway timetabling: ($i$) the determination of arrival and departure times of the trains at the stations and other

  19. An integrated micro-macro approach to robust railway timetabling

    DEFF Research Database (Denmark)

    Bešinović, Nikola; Goverde, Rob M P; Quaglietta, Egidio

    2016-01-01

    With the increasing demand for railway transportation infrastructure managers need improved automatic timetabling tools that provide feasible timetables with enhanced performance in short computation times. This paper proposes a hierarchical framework for timetable design which combines a microsc...

  20. Strategic, Tactical and Operational University Timetabling

    DEFF Research Database (Denmark)

    Lindahl, Michael

    University education is delivered via lectures and classes that are attended by students. When and where these classes are taught is determined by the timetable. A timetable has many stakeholders, and it is the task of planners to accommodate their needs as far as possible, as it has a significan...

  1. Quantitative Methods for Assessment of Railway Timetables

    DEFF Research Database (Denmark)

    Schittenhelm, Bernd Hermann

    performance indicators (KPIs) was developed foreach criterion. A total of 13 KPIs are presented. Their practical applicability has been successfully tested onexamples of real-life Danish timetables. The thesis recommends a revised timetabling process at railwayinfrastructure manager Rail Net Denmark (in...

  2. User Requirements Model for University Timetable Management System

    OpenAIRE

    Ahmad Althunibat; Mohammad I. Muhairat

    2016-01-01

    Automated timetables are used to schedule courses, lectures and rooms in universities by considering some constraints. Inconvenient and ineffective timetables often waste time and money. Therefore, it is important to investigate the requirements and potential needs of users. Thus, eliciting user requirements of University Timetable Management System (TMS) and their implication becomes an important process for the implementation of TMS. On this note, this paper seeks to propose a m...

  3. Development and application of Danish Key Performance Indicators for Railway Timetables

    DEFF Research Database (Denmark)

    Schittenhelm, Bernd; Landex, Alex

    ) by requiring improved products with reduced costs at the same time. Introducing Key Performance Indicators (KPI) can help achieve a higher efficiency. Creation of a feasible and attractive railway timetable is the most important process for both TOC and IM. When measuring the quality of the produced timetables......, one also measures the success of the applied timetabling process. KPI for railway timetables most be based on a common accepted set of timetabling criteria. This paper begins with a brief description of the process that lead to the creation of a common Danish list of prioritized timetabling evaluation...

  4. Practices in Timetabling in Higher Education Institutions

    NARCIS (Netherlands)

    Oude Vrielink, Rudy A.; Schepers, Daniël; Jansen, Erik A.; Hans, Elias W.; van Hillegersberg, Jos; Burke, Edmund K.; Di Gaspero, Luca; Ozcan, Ender; McCollum, Barry

    2016-01-01

    The study of differences between timetabling research presented in conferences like PATAT, and the timetabling software used in Higher Education Institutions (HEIs) is essential for the discussion about innovation in HEIs. In the field of planning and scheduling, a lot of developments are made and

  5. A MILP-based heuristic for a commercial train timetabling problem

    OpenAIRE

    Gestrelius, Sara; Aronsson, Martin; Peterson, Anders

    2017-01-01

    Using mathematical methods to support the yearly timetable planning process has many advantages. Unfortunately, the train timetabling problem for large geographical areas and many trains is intractable for optimization models alone. In this paper, we therefore present a MILP-based heuristic that has been designed to generate good-enough timetables for large geographical areas and many trains. In the incremental fix and release heuristic (IFRH), trains are added to the timetable in batches. Fo...

  6. Timetabling an Academic Department with Linear Programming.

    Science.gov (United States)

    Bezeau, Lawrence M.

    This paper describes an approach to faculty timetabling and course scheduling that uses computerized linear programming. After reviewing the literature on linear programming, the paper discusses the process whereby a timetable was created for a department at the University of New Brunswick. Faculty were surveyed with respect to course offerings…

  7. Automated generation of constructive ordering heuristics for educational timetabling

    OpenAIRE

    Pillay, Nelishia; Özcan, Ender

    2017-01-01

    Construction heuristics play an important role in solving combinatorial optimization problems. These heuristics are usually used to create an initial solution to the problem which is improved using optimization techniques such as metaheuristics. For examination timetabling and university course timetabling problems essentially graph colouring heuristics have been used for this purpose. The process of deriving heuristics manually for educational timetabling is a time consuming task. Furthermor...

  8. Negotiation time table and realization timetable in the grid connection process according to KraftNAV; Verhandlungs- und Realisierungsfahrplan im Netzanschlussverfahren nach der KraftNAV

    Energy Technology Data Exchange (ETDEWEB)

    Buchmann, Felix [Sozietaet Alber Buchmann Stefan Rechtsanwaelte, Reutlingen (Germany)

    2010-04-15

    With the ordinance for the regulation of the grid connection from plants of power production (KraftNAV), the conditions of the grid connection were concretized by power station projects with a nominal output of at least 100 MW with an electrical potential of at least 110 kV. Under this aspect, the author of the contribution under consideration reports on the negotiation timetable and realization timetable in the grid connection procedure according to the KraftNAV. The following aspects are treated: Procedure for the grid connection according to KraftNAV in the overview; Promise of the connection and reservation fee; Negotiation timetable; Realization timetable; Requirement timetable; Duties to supply information.

  9. Flow Formulation-based Model for the Curriculum-based Course Timetabling Problem

    DEFF Research Database (Denmark)

    Bagger, Niels-Christian Fink; Kristiansen, Simon; Sørensen, Matias

    2015-01-01

    problem. This decreases the number of integer variables signicantly and improves the performance compared to the basic formulation. It also shows competitiveness with other approaches based on mixed integer programming from the literature and improves the currently best known lower bound on one data...... instance in the benchmark data set from the second international timetabling competition.......In this work we will present a new mixed integer programming formulation for the curriculum-based course timetabling problem. We show that the model contains an underlying network model by dividing the problem into two models and then connecting the two models back into one model using a maximum ow...

  10. A Double Evolutionary Pool Memetic Algorithm for Examination Timetabling Problems

    Directory of Open Access Journals (Sweden)

    Yu Lei

    2014-01-01

    Full Text Available A double evolutionary pool memetic algorithm is proposed to solve the examination timetabling problem. To improve the performance of the proposed algorithm, two evolutionary pools, that is, the main evolutionary pool and the secondary evolutionary pool, are employed. The genetic operators have been specially designed to fit the examination timetabling problem. A simplified version of the simulated annealing strategy is designed to speed the convergence of the algorithm. A clonal mechanism is introduced to preserve population diversity. Extensive experiments carried out on 12 benchmark examination timetabling instances show that the proposed algorithm is able to produce promising results for the uncapacitated examination timetabling problem.

  11. Optimization of timetable supplement from a passenger based socio-economic point of view

    DEFF Research Database (Denmark)

    Thorhauge, Mikkel

    amount of timetable supplement. Too little timetable supplement will result in many delays, while too high timetable supplement will result in a (too) high planned travel time which will affect every departure whether or not the train is delayed. At present timetable supplement is chosen based...

  12. A three-level framework for performance-based railway timetabling

    DEFF Research Database (Denmark)

    Goverde, Rob M P; Bešinović, Nikola; Binder, Anne

    2016-01-01

    . This paper presents a performance-based railway timetabling framework integrating timetable construction and evaluation on three levels: microscopic, macroscopic, and a corridor fine-tuning level, where each performance indicator is optimized or evaluated at the appropriate level. A modular implementation...

  13. User perspectives in public transport timetable optimisation

    DEFF Research Database (Denmark)

    Jensen, Jens Parbo; Nielsen, Otto Anker; Prato, Carlo Giacomo

    2014-01-01

    The present paper deals with timetable optimisation from the perspective of minimising the waiting time experienced by passengers when transferring either to or from a bus. Due to its inherent complexity, this bi-level minimisation problem is extremely difficult to solve mathematically, since tim...... on the large-scale public transport network in Denmark. The timetable optimisation approach yielded a yearly reduction in weighted waiting time equivalent to approximately 45 million Danish kroner (9 million USD)....

  14. A three-level framework for performance-based railway timetabling

    NARCIS (Netherlands)

    Goverde, R.M.P.; Besinovic, N.; Binder, A.; Cacchiani, V.; Quaglietta, E.; Roberti, R.; Toth, P.

    2015-01-01

    The performance of railway operations depends highly on the quality of the railway timetable. In particular for dense railway networks it can be a challenge to obtain a stable robust conflict-free and energy-efficient timetable with acceptable infrastructure occupation and short travel times. This

  15. Networked Timetable Stability Improvement Based on a Bilevel Optimization Programming Model

    Directory of Open Access Journals (Sweden)

    Xuelei Meng

    2014-01-01

    Full Text Available Train timetable stability is the possibility to recover the status of the trains to serve as arranged according to the original timetable when the trains are disturbed. To improve the train timetable stability from the network perspective, the bilevel programming model is constructed, in which the upper level programming is to optimize the timetable stability on the network level and the lower is to improve the timetable stability on the dispatching railway segments. Timetable stability on the network level is defined with the variances of the utilization coefficients of the section capacity and station capacity. Weights of stations and sections are decided by the capacity index number and the degrees. The lower level programming focuses on the buffer time distribution plan of the trains operating on the sections and stations, taking the operating rules of the trains as constraints. A novel particle swarm algorithm is proposed and designed for the bilevel programming model. The computing case proves the feasibility of the model and the efficiency of the algorithm. The method outlined in this paper can be embedded in the networked train operation dispatching system.

  16. Case-Based Reasoning as a Heuristic Selector in a Hyper-Heuristic for Course Timetabling Problems

    OpenAIRE

    Petrovic, Sanja; Qu, Rong

    2002-01-01

    This paper studies Knowledge Discovery (KD) using Tabu Search and Hill Climbing within Case-Based Reasoning (CBR) as a hyper-heuristic method for course timetabling problems. The aim of the hyper-heuristic is to choose the best heuristic(s) for given timetabling problems according to the knowledge stored in the case base. KD in CBR is a 2-stage iterative process on both case representation and the case base. Experimental results are analysed and related research issues for future work are dis...

  17. Freight railway operator timetabling and engine scheduling

    DEFF Research Database (Denmark)

    Bach, Lukas; Gendreau, M.; Wøhlk, Sanne

    2015-01-01

    In this paper we consider timetable design at a European freight railway operator. The timetable is designed by choosing the time of service for customer unit train demands among a set of discrete points. These discrete points are all found within the a time-window. The objective of the model...... is to minimize cost while adhering to constraints regarding infrastructure usage, demand coverage, and engine availability. The model is solved by a column generation scheme where feasible engine schedules are designed in a label setting algorithm with time-dependent cost and service times....

  18. An overview of curriculum-based course timetabling

    DEFF Research Database (Denmark)

    Bettinelli, Andrea; Cacchiani, Valentina; Roberti, Roberto

    2015-01-01

    In 2007, the Second International Timetabling Competition (ITC-2007) has been organized and a formal definition of the Curriculum-Based Course Timetabling (CB-CTT) problem has been given, by taking into account several real-world constraints and objectives while keeping the problem general. CB......-CTT consists of finding the best weekly assignment of university course lectures to rooms and time periods. A feasible schedule must satisfy a set of hard constraints and must also take into account a set of soft constraints, whose violation produces penalty terms to be minimized in the objective function...

  19. International Timetabling Competition 2011: An Adaptive Large Neighborhood Search algorithm

    DEFF Research Database (Denmark)

    Sørensen, Matias; Kristiansen, Simon; Stidsen, Thomas Riis

    2012-01-01

    An algorithm based on Adaptive Large Neighborhood Search (ALNS) for solving the generalized High School Timetabling problem in XHSTT-format (Post et al (2012a)) is presented. This algorithm was among the nalists of round 2 of the International Timetabling Competition 2011 (ITC2011). For problem...

  20. A NNIA Scheme for Timetabling Problems

    Directory of Open Access Journals (Sweden)

    Yu Lei

    2017-01-01

    Full Text Available This paper presents a memetic multiobjective optimization algorithm based on NNIA for examination timetabling problems. In this paper, the examination timetabling problem is considered as a two-objective optimization problem while it is modeled as a single-objective optimization problem generally. Within the NNIA framework, the special crossover operator is utilized to search in the solution space; two local search techniques are employed to optimize these two objectives and a diversity-keeping strategy which consists of an elitism group operator and an extension optimization operator to ensure a sufficient number of solutions in the pareto front. The proposed algorithm was tested on the most widely used uncapacitated Carter benchmarks. Experimental results prove that the proposed algorithm is a competitive algorithm.

  1. A matheuristic for transfer synchronization through integrated timetabling and vehicle scheduling

    NARCIS (Netherlands)

    Roberti, R.

    2018-01-01

    Long transfer times often add unnecessary inconvenience to journeys in public transport systems. Synchronizing relevant arrival and departure times through small timetable modifications could reduce excess transfer times, but may also directly affect the operational costs, as the timetable defines

  2. A Four-phase Approach to a Timetabling Problem in Secondary Schools

    NARCIS (Netherlands)

    de Haan, P.; Landman, Ronald; Post, Gerhard F.; Ruizenaar, H.W.A.; Ruizenaar, Henri; Burke, E.K.; Rudová, H.

    2006-01-01

    Timetabling problems are present in all types of schools. The research in this area is still very active; of the 19 selected contributions of PATAT 2004 ([1]), 12 are dedicated to Educational Timetabling. These problems can often be modeled by a graph coloring problem. Here the vertices represent

  3. Dynamics of subway networks based on vehicles operation timetable

    Science.gov (United States)

    Xiao, Xue-mei; Jia, Li-min; Wang, Yan-hui

    2017-05-01

    In this paper, a subway network is represented as a dynamic, directed and weighted graph, in which vertices represent subway stations and weights of edges represent the number of vehicles passing through the edges by considering vehicles operation timetable. Meanwhile the definitions of static and dynamic metrics which can represent vertices' and edges' local and global attributes are proposed. Based on the model and metrics, standard deviation is further introduced to study the dynamic properties (heterogeneity and vulnerability) of subway networks. Through a detailed analysis of the Beijing subway network, we conclude that with the existing network structure, the heterogeneity and vulnerability of the Beijing subway network varies over time when the vehicle operation timetable is taken into consideration, and the distribution of edge weights affects the performance of the network. In other words, although the vehicles operation timetable is restrained by the physical structure of the network, it determines the performances and properties of the Beijing subway network.

  4. [EU-Cosmetics: timetables for the replacement of animal experiments].

    Science.gov (United States)

    Ruhdel, Irmela Wiltrud

    2005-01-01

    According to the 7(th) Amendment of the Cosmetics Directive the European Commission had to establish timetables for the phasing out of the various animal tests for the safety evaluation of ingredients used in cosmetics. However, the published timetables do not reflect the objectives of the 7(th) Amendment but contain longer deadlines for the ban on animal experiments of several endpoints. The European Commission also had to draw up a Directive for establishing an Annex IX that should list validated alternative methods which are not already listed in Annex V of the Dangerous Substances Directive. Although various alternative methods could have been listed in this Annex IX, the Commission published an empty table. From the point of view of the German Animal Welfare Federation amendments of the timetables and the Directive establishing Annex IX are urgently required. Additionally, the Commission has to provide optimal conditions for the replacement of alternative methods.

  5. Passenger oriented railway disruption management by adapting timetables and rolling stock schedules

    NARCIS (Netherlands)

    Veelenturf, L.P.; Kroon, L.G.; Maróti, G.

    2017-01-01

    In passenger railway operations, unforeseen events require railway operators to adjust their timetable and their resource schedules. The passengers will also adapt their routes to their destinations. When determining the new timetable and rolling stock schedule, the railway operator has to take

  6. Flow Formulations for Curriculum-based Course Timetabling

    DEFF Research Database (Denmark)

    Bagger, Niels-Christian Fink; Kristiansen, Simon; Sørensen, Matias

    2017-01-01

    lower bound on one data instance in the benchmark data set from the second international timetabling competition. Regarding upper bounds, the formulation based on the minimum cost flow problem performs better on average than other mixed integer programming approaches for the CTT.......In this paper we present two mixed-integer programming formulations for the Curriculum based Course Timetabling Problem (CTT). We show that the formulations contain underlying network structures by dividing the CTT into two separate models and then connect the two models using flow formulation...... techniques. The first mixed-integer programming formulation is based on an underlying minimum cost flow problem, which decreases the number of integer variables significantly and improves the performance compared to an intuitive mixed-integer programming formulation. The second formulation is based...

  7. Role of Ti3Al/silicides on tensile properties of Timetal 834 at various ...

    Indian Academy of Sciences (India)

    WINTEC

    In order to assess the role of these precipitates, three heat treatments viz. WQ, WQ–A and. WQ–OA .... In general, while the work hardening exponent (n) in- creases with ... Tensile stress–strain curves of the alloy, Timetal. 834, in WQ–A and ...

  8. Measuring Robustness of Timetables at Stations using a Probability Distribution

    DEFF Research Database (Denmark)

    Jensen, Lars Wittrup; Landex, Alex

    Stations are often the limiting capacity factor in a railway network. This induces interdependencies, especially at at-grade junctions, causing network effects. This paper presents three traditional methods that can be used to measure the complexity of a station, indicating the robustness...... of the station’s infrastructure layout and plan of operation. However, these three methods do not take the timetable at the station into consideration. Therefore, two methods are introduced in this paper, making it possible to estimate the robustness of different timetables at a station or different...... infrastructure layouts given a timetable. These two methods provide different precision at the expense of a more complex calculation process. The advanced and more precise method is based on a probability distribution that can describe the expected delay between two trains as a function of the buffer time...

  9. A matheuristic for transfer synchronization through integrated timetabling and vehicle scheduling

    DEFF Research Database (Denmark)

    Fonseca, João Paiva; van der Hurk, Evelien; Roberti, Roberto

    2018-01-01

    Long transfer times often add unnecessary inconvenience to journeys in public transport systems. Synchronizing relevant arrival and departure times through small timetable modifications could reduce excess transfer times, but may also directly affect the operational costs, as the timetable defines...... the set of feasible vehicle schedules. Therefore better results in terms of passenger service, operational costs, or both, could be obtained by solving these problems simultaneously....

  10. New timetable for a Regular morning and evening shuttle

    CERN Multimedia

    TS Department

    2008-01-01

    Starting from 31 March 2008, for one month, a new timetable for a regular morning and evening shuttle serving LHC Points 2 and 5 will be put in place. You can find all the corresponding details on the FM group WEB page: http://ts-dep.web.cern.ch/ts-dep/groups/fm/logistique/shuttle_timetable.htm Please note that during April, all other requests for transport from Meyrin and Prévessin to the LHC Points via tel. 76969 during the day (between 8:30 and 17:30) will not be met. TS/FM group Tel. 160239

  11. New timetable for a morning and evening regular shuttle

    CERN Multimedia

    TS Department

    2008-01-01

    Starting from the 31st of March 2008 and for one month, a new timetable for a morning and evening regular shuttle serving LHC Points 2 and 5, will be put in place. You can find all the corresponding details in the FM group WEB page http://ts-dep.web.cern.ch/ts-dep/groups/fm/logistique/shuttle_timetable.htm Please note that during April, every other request of transfer from Meyrin and Prevessin towards LHC Points reaching the 76969 during the day (between 8:30 and 17:30) will not be satisfied. TS/FM group 160239

  12. High School Timetabling: Modeling and solving a large number of cases in Denmark

    DEFF Research Database (Denmark)

    Sørensen, Matias; Stidsen, Thomas Riis

    2012-01-01

    for high school administration (available only for Danish high schools), which includes an embedded application for creating a weekly timetable. Currently, 230 high schools are customers of Lectio, and 191 have bought access to the timetabling software. This constitutes the majority of high schools...

  13. University course timetabling and the requirements: Survey in several universities in the east-coast of Malaysia

    Science.gov (United States)

    Aziz, Nurul Liyana Abdul; Aizam, Nur Aidya Hanum

    2017-08-01

    Course timetabling problem receives the highlight at the beginning of every semester. The problem is mainly on assigning courses to timeslot, rooms and lecturers which involving a set of rules and policies constraints. Generally, researchers present different features to signify their own universities' timetable according to the structure and behavior of their institution. However, the gap between theory and real-world applications that can be seen in the resulted timetable is the lacking of acknowledging human preferences. As to overcome this, it is very important to consider all the demands and preferences from timetabling community. This research therefore tries to accommodate the problem by investigating through surveys to several universities in the east coast of Malaysia the demands and preferences of individuals involved directly. Results from the questionnaires will be analyzed by using SPSS and all current issues regarding the demands will be included into our existing general university course timetabling mathematical model. The new university course timetabling mathematical model could best represent universities and be useful, especially in universities in Malaysia.

  14. Solving Multiple Timetabling Problems at Danish High Schools

    DEFF Research Database (Denmark)

    Kristiansen, Simon

    name; Elective Course Student Sectioning. The problem is solved using ALNS and solutions are proven to be close to optimum. The algorithm has been implemented and made available for the majority of the high schools in Denmark. The second Student Sectioning problem presented is the sectioning of each...... high schools. Two types of consultations are presented; the Parental Consultation Timetabling Problem (PCTP) and the Supervisor Consultation Timetabling Problem (SCTP). One mathematical model containing both consultation types has been created and solved using an ALNS approach. The received solutions...... problems as mathematical models and solve them using operational research techniques. Two of the models and the suggested solution methods have resulted in implementations in an actual decision support software, and are hence available for the majority of the high schools in Denmark. These implementations...

  15. Timetable Design for Urban Rail Line with Capacity Constraints

    Directory of Open Access Journals (Sweden)

    Yu-Ting Zhu

    2015-01-01

    Full Text Available To design an efficient and economical timetable for a heavily congested urban rail corridor, a scheduling model is proposed in this paper. The objective of the proposed model is to find the departure time of trains at the start terminal to minimize the system cost, which includes passenger waiting cost and operating cost. To evaluate the performance of the timetable, a simulation model is developed to simulate the detailed movements of passengers and trains with strict constraints of station and train capacities. It assumes that passengers who arrive early will have more chances to access a station and board a train. The accessing and boarding processes of passengers are all based on a first-come-first-serve basis. When a station is full, passengers unable to access must wait outside until the number of waiting passengers at platform falls below a given value. When a train is full, passengers unable to board must wait at the platform for the next train to arrive. Then, based on the simulation results, a two-stage genetic algorithm is introduced to find the best timetable. Finally, a numerical example is given to demonstrate the effectiveness of the proposed model and solution method.

  16. Passenger Perspectives in Railway Timetabling: A Literature Review

    DEFF Research Database (Denmark)

    Jensen, Jens Parbo; Nielsen, Otto Anker; Prato, Carlo Giacomo

    2016-01-01

    When looking at railway planning, a discrepancy exists between planners who focus on the train operations and publish fixed railway schedules, and passengers who look not only at the schedules but also at the entirety of their trip, from access to waiting to on-board travel and egress. Looking...... with fluctuating passenger demand. A key aspect is the robustness of railway timetables. Empirical evidence indicates that passengers give more importance to travel time certainty than travel time reductions, as passengers associate an inherent disutility with travel time uncertainty. This disutility may...... be broadly interpreted as an anxiety cost for the need for having contingency plans in case of disruptions, and may be looked at as the motivator for the need for delay-robust railway timetables. Interestingly, passenger-oriented optimisation studies considering robustness in railway planning typically limit...

  17. Memetic Algorithm and its Application to the Arrangement of Exam Timetable

    Directory of Open Access Journals (Sweden)

    Wenhua Huang

    2016-06-01

    Full Text Available This paper looks at Memetic Algorithm for solving timetabling problems. We present a new memetic algorithm which consists of global search algorithm and local search algorithm. In the proposed method, a genetic algorithm is chosen for global search algorithm while a simulated annealing algorithm is used for local search algorithm. In particular, we could get an optimal solution through the .NET with the real data of JiangXi Normal University. Experimental results show that the proposed algorithm can solve the university exam timetabling problem efficiently.

  18. Application of the Theory of Constraints in Project Based Structures

    OpenAIRE

    Martynas Sarapinas; Vytautas Pranas Sūdžius

    2011-01-01

    The article deals with the application of the Theory of Constraints (TOC) in project management. This article involves a short introduction to TOC as a project management method and deep analysis of project management specialties using the TOC: TOC based project planning, timetable management, tasks synchronization, project control and “relay runner work ethic”. Moreover, the article describes traditional and TOC based project management theories in their comparison, and emphasize the main be...

  19. Time-dependent Networks as Models to Achieve Fast Exact Time-table Queries

    DEFF Research Database (Denmark)

    Brodal, Gerth Stølting; Jacob, Rico

    2001-01-01

    We consider efficient algorithms for exact time-table queries, i.e. algorithms that find optimal itineraries. We propose to use time-dependent networks as a model and show advantages of this approach over space-time networks as models.......We consider efficient algorithms for exact time-table queries, i.e. algorithms that find optimal itineraries. We propose to use time-dependent networks as a model and show advantages of this approach over space-time networks as models....

  20. Review of energy-efficient train control and timetabling

    NARCIS (Netherlands)

    Scheepmaker, G.M.; Goverde, R.M.P.; Kroon, LG

    2016-01-01

    The energy consumption of trains is highly efficient due to the low friction between steel wheels and rails, although the efficiency is also influenced largely by the driving strategy applied and the scheduled running times in the timetable. Optimal energy-efficient driving strategies can reduce

  1. Time-Dependent Networks as Models to Achieve Fast Exact Time-Table Queries

    DEFF Research Database (Denmark)

    Brodal, Gert Stølting; Jacob, Rico

    2003-01-01

    We consider efficient algorithms for exact time-table queries, i.e. algorithms that find optimal itineraries for travelers using a train system. We propose to use time-dependent networks as a model and show advantages of this approach over space-time networks as models.......We consider efficient algorithms for exact time-table queries, i.e. algorithms that find optimal itineraries for travelers using a train system. We propose to use time-dependent networks as a model and show advantages of this approach over space-time networks as models....

  2. Solving the Examination Timetabling Problem in GPUs

    Directory of Open Access Journals (Sweden)

    Vasileios Kolonias

    2014-07-01

    Full Text Available The examination timetabling problem belongs to the class of combinatorial optimization problems and is of great importance for every University. In this paper, a hybrid evolutionary algorithm running on a GPU is employed to solve the examination timetabling problem. The hybrid evolutionary algorithm proposed has a genetic algorithm component and a greedy steepest descent component. The GPU computational capabilities allow the use of very large population sizes, leading to a more thorough exploration of the problem solution space. The GPU implementation, depending on the size of the problem, is up to twenty six times faster than the identical single-threaded CPU implementation of the algorithm. The algorithm is evaluated with the well known Toronto datasets and compares well with the best results found in the bibliography. Moreover, the selection of the encoding of the chromosomes and the tournament selection size as the population grows are examined and optimized. The compressed sparse row format is used for the conflict matrix and was proven essential to the process, since most of the datasets have a small conflict density, which translates into an extremely sparse matrix.

  3. Application of the Theory of Constraints in Project Based Structures

    Directory of Open Access Journals (Sweden)

    Martynas Sarapinas

    2011-04-01

    Full Text Available The article deals with the application of the Theory of Constraints (TOC in project management. This article involves a short introduction to TOC as a project management method and deep analysis of project management specialties using the TOC: TOC based project planning, timetable management, tasks synchronization, project control and “relay runner work ethic”. Moreover, the article describes traditional and TOC based project management theories in their comparison, and emphasize the main benefits we received as the results of the study. Article in Lithuanian

  4. A Fuzzy Optimization Model for High-Speed Railway Timetable Rescheduling

    Directory of Open Access Journals (Sweden)

    Li Wang

    2012-01-01

    Full Text Available A fuzzy optimization model based on improved symmetric tolerance approach is introduced, which allows for rescheduling high-speed railway timetable under unexpected interferences. The model nests different parameters of the soft constraints with uncertainty margin to describe their importance to the optimization purpose and treats the objective in the same manner. Thus a new optimal instrument is expected to achieve a new timetable subject to little slack of constraints. The section between Nanjing and Shanghai, which is the busiest, of Beijing-Shanghai high-speed rail line in China is used as the simulated measurement. The fuzzy optimization model provides an accurate approximation on train running time and headway time, and hence the results suggest that the number of seriously impacted trains and total delay time can be reduced significantly subject to little cost and risk.

  5. Integration of a Course Enrolment and Class Timetable Scheduling in a Student Information System

    OpenAIRE

    Vangel V. Ajanovski

    2013-01-01

    This paper is dealing with the most important issues of two of the most significant university administrativeprocesses – the process of term enrolment with course enrolment and the process of organization of classesand scheduling a conflict-free class timetable. In the first part of the paper an introduction to the problemis set and the impact and interrelation of the two processes is explained in detail. In the second part of thepaper, the focus is on the process of class timetable schedulin...

  6. Combination of graph heuristics in producing initial solution of curriculum based course timetabling problem

    Science.gov (United States)

    Wahid, Juliana; Hussin, Naimah Mohd

    2016-08-01

    The construction of population of initial solution is a crucial task in population-based metaheuristic approach for solving curriculum-based university course timetabling problem because it can affect the convergence speed and also the quality of the final solution. This paper presents an exploration on combination of graph heuristics in construction approach in curriculum based course timetabling problem to produce a population of initial solutions. The graph heuristics were set as single and combination of two heuristics. In addition, several ways of assigning courses into room and timeslot are implemented. All settings of heuristics are then tested on the same curriculum based course timetabling problem instances and are compared with each other in terms of number of population produced. The result shows that combination of saturation degree followed by largest degree heuristic produce the highest number of population of initial solutions. The results from this study can be used in the improvement phase of algorithm that uses population of initial solutions.

  7. A direct comparison of physical block occupancy versus timed block occupancy in train timetabling formulations

    DEFF Research Database (Denmark)

    Harrod, Steven; Schlechte, Thomas

    2013-01-01

    Two fundamental mathematical formulations for railway timetabling are compared on a common set of sample problems, representing both multiple track high density services in Europe and single track bidirectional operations in North America. One formulation, ACP, enforces against conflicts by const......Two fundamental mathematical formulations for railway timetabling are compared on a common set of sample problems, representing both multiple track high density services in Europe and single track bidirectional operations in North America. One formulation, ACP, enforces against conflicts...

  8. Adding randomness controlling parameters in GRASP method applied in school timetabling problem

    Directory of Open Access Journals (Sweden)

    Renato Santos Pereira

    2017-09-01

    Full Text Available This paper studies the influence of randomness controlling parameters (RCP in first stage GRASP method applied in graph coloring problem, specifically school timetabling problems in a public high school. The algorithm (with the inclusion of RCP was based on critical variables identified through focus groups, whose weights can be adjusted by the user in order to meet the institutional needs. The results of the computational experiment, with 11-year-old data (66 observations processed at the same high school show that the inclusion of RCP leads to significantly lowering the distance between initial solutions and local minima. The acceptance and the use of the solutions found allow us to conclude that the modified GRASP, as has been constructed, can make a positive contribution to this timetabling problem of the school in question.

  9. Modeling and Solution Methods for the Energy-Efficient Train Timetables Problem

    DEFF Research Database (Denmark)

    Haahr, Jørgen Thorlund; Kidd, Martin Philip

    2015-01-01

    Timely recuperation of energy through regenerative braking is crucial in order to ensure energy ecient railway timetables. This requires a careful synchronisation of train departures such that high energy peaks, as a result of simultaneously accelerating trains, can be avoided. In this report we...

  10. Computation of a Suburban Night Train Timetable Based on Key Performance Indicators

    DEFF Research Database (Denmark)

    Schittenhelm, Bernd; Landex, Alex

    2010-01-01

    Timetable evaluation can be based on a set of key performance indicators. This article presents six essential key performance indicators: Fixed interval service frequency, direct connections, transfer waiting time, use of dedicated rolling stock, dedicated train personnel, dedicated tracks...

  11. A Two-Stage Decomposition of High School Timetabling applied to cases in Denmark

    DEFF Research Database (Denmark)

    Sørensen, Matias; Dahms, Florian H.W.

    2014-01-01

    Integer Programming (IP) has been used to model educational timetabling problems since the very early days of Operations Research. It is well recognized that these IP models in general are hard to solve, and this area of research is dominated by heuristic solution approaches. In this paper a Two-...... the database of the high school ERP system Lectio are used. Computational results show that the decomposition performs significantly better than solving the original IP, in terms of both found solutions and bounds.......Integer Programming (IP) has been used to model educational timetabling problems since the very early days of Operations Research. It is well recognized that these IP models in general are hard to solve, and this area of research is dominated by heuristic solution approaches. In this paper a Two...

  12. Realistic, achievable and effective targets and timetables

    International Nuclear Information System (INIS)

    Hambley, M.G.

    1997-01-01

    The current status of U.S. policy regarding climate change, and the U.S. perspective on targets and timetables were discussed. U.S. policy is based on four particular points: (1) legally binding, multi-year emissions budgets, (2) focus on medium, not short-term targets, (3) maximum flexibility offered to parties to reach whatever targets are agreed upon, and (4) a proposal concerning developing countries. It was strongly suggested that if the December 1997 conference in Kyoto is to succeed, developing countries would have to have a role in negotiations. Greenhouse gas emissions and climate change are global issues, and can only be solved by global action

  13. Constructing Periodic Timetables using MIP - a case study from DSB S-train

    DEFF Research Database (Denmark)

    Nielsen, Morten N.; Hove, Bjørn; Clausen, Jens

    2006-01-01

    We describe a mathematical model to create operational timetable alternatives in DSB S-tog a/s. The model is a mixed integer program implemented in GAMS and solved by CPLEX. We investigate the impact of automatic merges of lines and perform scenario analysis for a subset of the parameters...

  14. Learning Physical Examination Skills outside Timetabled Training Sessions: What Happens and Why?

    Science.gov (United States)

    Duvivier, Robbert J.; van Geel, Koos; van Dalen, Jan; Scherpbier, Albert J. J. A.; van der Vleuten, Cees P. M.

    2012-01-01

    Lack of published studies on students' practice behaviour of physical examination skills outside timetabled training sessions inspired this study into what activities medical students undertake to improve their skills and factors influencing this. Six focus groups of a total of 52 students from Years 1-3 using a pre-established interview guide.…

  15. The mathematical model of the task of compiling the time-table

    Directory of Open Access Journals (Sweden)

    О.Є. Литвиненко

    2004-01-01

    Full Text Available  The mathematical model of the task of compiling the time-table in High-school has been carried out.  It has been showed, that the task may be reduced to canonical form of extrimal combinatorial tasks with unlinear structure after identical transformations. The algorithm of the task’s decision for realizing the scheme of the directed sorting of variants is indicated.

  16. Strong Relaxations for the Train Timetabling Problem Using Connected Configurations

    OpenAIRE

    Fischer, Frank; Schlechte, Thomas

    2017-01-01

    The task of the train timetabling problem or track allocation problem is to find conflict free schedules for a set of trains with predefined routes in a railway network. Especially for non-periodic instances models based on time expanded networks are often used. Unfortunately, the linear programming relaxation of these models is often extremely weak because these models do not describe combinatorial relations like overtaking possibilities very well. In this paper we extend the model by so cal...

  17. Role of Ti 3 Al/silicides on tensile properties of Timetal 834 at ...

    Indian Academy of Sciences (India)

    Extremely fine coherent precipitates of ordered Ti3Al and relatively coarse incoherent precipitates of 2 silicide exist together in the near -titanium alloy, Timetal 834, in the dual phase matrix of primary and transformed . In order to assess the role of these precipitates, three heat treatments viz. WQ, WQ–A and WQ–OA, ...

  18. Secondary Vocational Education in Working Environment

    Directory of Open Access Journals (Sweden)

    Gvido Melink

    2001-12-01

    Full Text Available The authors present a successful project of secondary vocational education carried out by our school for the occupation of a toolmaker and a machinist for the companies Domel, Indramat and Niko in Železniki, considering the modern methods of teaching adults and having consistently adjusted timetable of the lectures in accordance with the working hours of the candidates and the production process respectively. Lectures, training and practical work in the workshop were performed in the company and school's workshops and laboratories. In the additional chapter the authors draw attention to the problems of payment for the teachers of technical s ubjects, who enter the education process with great working experience from companies but start here as beginners since the school regulations do not define such cases.

  19. Distributed Project Work

    DEFF Research Database (Denmark)

    Borch, Ole; Kirkegaard, B.; Knudsen, Morten

    1998-01-01

    Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work in a distr......Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work...... in a distributed fashion over the Internet needs more attention to the interaction protocol since the physical group room is not existing. The purpose in this paper is to develop a method for online project work by using the product: Basic Support for Cooperative Work (BSCV). An analysis of a well-proven protocol...... for information exchange in the traditional project environment is performed. A group of teachers and a student group using small project examples test the method. The first test group used a prototype for testing and found the new activity synchronization difficult to adapt, so the method was finally adjusted...

  20. Distributed Project Work

    DEFF Research Database (Denmark)

    Borch, Ole; Kirkegaard, B.; Knudsen, Morten

    1998-01-01

    for information exchange in the traditional project environment is performed. A group of teachers and a student group using small project examples test the method. The first test group used a prototype for testing and found the new activity synchronization difficult to adapt, so the method was finally adjusted...... to be very precises and with success used on the second test group. Distributed project work is coming pretty soon and with little improvement in server tools, projects in different topics with a large and inhomogeneous profile of users are realistic.......Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work...

  1. Perspectives on projects, project success and team work

    OpenAIRE

    Thompson, Karen

    2015-01-01

    This paper brings together perspectives on projects, project success and team work as a background to two graphical tools for considering project success and individual capabilities for working in a project team.

  2. Znaczenie semestralnego rozkładu zajęć w prawidłowym żywieniu studentów = The importance of semester timetable in correct student’s nutrition

    Directory of Open Access Journals (Sweden)

    Ewelina Kozłowska

    2016-08-01

        Słowa kluczowe: żywienie, studenci, rozkład zajęć. Keywords: nutrition, students, timetable.   Streszczenie Wprowadzenie i cel pracy: Grupą społeczną szczególnie narażoną na uleganie antyzdrowotnym zachowaniom żywieniowym są studenci, których dzień zdeterminowany jest narzuconym przez uczelnię semestralnym planem zajęć. Celem podjętych badań było określenie wpływu satysfakcji z semestralnego rozkładu zajęć na sposób żywienia młodzieży akademickiej. Materiał i metoda:  Badanie przeprowadzono wśród stu wybranych studentów Uniwersytetu Medycznego w Lublinie posługując się autorskim kwestionariuszem ankiety. Analizę statystyczną wykonano nieparametrycznym testem statystycznym χ2 Pearsona. Wyniki: 70% studentów  jest  niezadowolonych z obecnego planu zajęć, biorąc pod uwagę możliwość zdrowego odżywiania się. Najliczniejszą grupę studentów oceniających plan zajęć jako dostosowany do ich potrzeb żywieniowych stanowią osoby mieszkające w akademikach. Stwierdzono istotną statystycznie zależność między niezadowoleniem z planu zajęć, a brakiem czasu na samodzielne przygotowanie pełnowartościowych posiłków (p=0,000653. Plan zajęć nie wpływa istotnie na częstotliwość pojadania między posiłkami, jednakże studenci niezadowoleni z niego częściej jedzą w pośpiechu. Wnioski: Młodzież akademicka napotyka na utrudnienia w stosowaniu zaleceń zdrowego odżywiania, które wynikają bezpośrednio z nieodpowiadającego im planu zajęć. Osoby odpowiedzialne za  tworzenie rozkładów zajęć w trosce o zdrowie studentów powinni mieć na uwadze ich potrzeby żywieniowe.     Abstract Introduction and work aim: Social group particularly exposed to anti-health nutritional behaviour are students, whose day is determined by the University imposed semester timetable. An aim of the study was to define the impact of satisfaction from a semester timetable on nutrition of the university students

  3. 33 CFR Appendix G to Part 157 - Timetables for Application of Double Hull Requirements

    Science.gov (United States)

    2010-07-01

    ... Double Hull Requirements G Appendix G to Part 157 Navigation and Navigable Waters COAST GUARD, DEPARTMENT... Application of Double Hull Requirements 1. Source. These timetables conform to 46 U.S.C. 3703a(c). 2... double hull or with a double containment system determined by the Coast Guard to be as effective as a...

  4. 50 CFR 84.44 - What is the timetable for the use of grant money?

    Science.gov (United States)

    2010-10-01

    ... money? 84.44 Section 84.44 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF... WETLANDS CONSERVATION GRANT PROGRAM Conditions on Acceptance/Use of Federal Money § 84.44 What is the timetable for the use of grant money? Once money is granted to the coastal States, the money is available to...

  5. Global Optimization for Bus Line Timetable Setting Problem

    Directory of Open Access Journals (Sweden)

    Qun Chen

    2014-01-01

    Full Text Available This paper defines bus timetables setting problem during each time period divided in terms of passenger flow intensity; it is supposed that passengers evenly arrive and bus runs are set evenly; the problem is to determine bus runs assignment in each time period to minimize the total waiting time of passengers on platforms if the number of the total runs is known. For such a multistage decision problem, this paper designed a dynamic programming algorithm to solve it. Global optimization procedures using dynamic programming are developed. A numerical example about bus runs assignment optimization of a single line is given to demonstrate the efficiency of the proposed methodology, showing that optimizing buses’ departure time using dynamic programming can save computational time and find the global optimal solution.

  6. A Model for the Stop Planning and Timetables of Customized Buses.

    Directory of Open Access Journals (Sweden)

    Jihui Ma

    Full Text Available Customized buses (CBs are a new mode of public transportation and an important part of diversified public transportation, providing advanced, attractive and user-led service. The operational activity of a CB is planned by aggregating space-time demand and similar passenger travel demands. Based on an analysis of domestic and international research and the current development of CBs in China and considering passenger travel data, this paper studies the problems associated with the operation of CBs, such as stop selection, line planning and timetables, and establishes a model for the stop planning and timetables of CBs. The improved immune genetic algorithm (IIGA is used to solve the model with regard to the following: 1 multiple population design and transport operator design, 2 memory library design, 3 mutation probability design and crossover probability design, and 4 the fitness calculation of the gene segment. Finally, a real-world example in Beijing is calculated, and the model and solution results are verified and analyzed. The results illustrate that the IIGA solves the model and is superior to the basic genetic algorithm in terms of the number of passengers, travel time, average passenger travel time, average passenger arrival time ahead of schedule and total line revenue. This study covers the key issues involving operational systems of CBs, combines theoretical research and empirical analysis, and provides a theoretical foundation for the planning and operation of CBs.

  7. Knowledge discovery in hyper-heuristic using case-based reasoning on course timetabling

    OpenAIRE

    Burke, Edmund; MacCarthy, Bart L.; Petrovic, Sanja; Qu, Rong

    2002-01-01

    This paper presents a new hyper-heuristic method using Case-Based Reasoning (CBR) for solving course timetabling problems. The term Hyper-heuristics has recently been employed to refer to 'heuristics that choose heuristics' rather than heuristics that operate directly on given problems. One of the overriding motivations of hyper-heuristic methods is the attempt to develop techniques that can operate with greater generality than is currently possible. The basic idea behind this is that we main...

  8. Benders’ Decomposition for Curriculum-Based Course Timetabling

    DEFF Research Database (Denmark)

    Bagger, Niels-Christian F.; Sørensen, Matias; Stidsen, Thomas R.

    2018-01-01

    feasibility. We compared our algorithm with other approaches from the literature for a total of 32 data instances. We obtained a lower bound on 23 of the instances, which were at least as good as the lower bounds obtained by the state-of-the-art, and on eight of these, our lower bounds were higher. On two......In this paper we applied Benders’ decomposition to the Curriculum-Based Course Timetabling (CBCT) problem. The objective of the CBCT problem is to assign a set of lectures to time slots and rooms. Our approach was based on segmenting the problem into time scheduling and room allocation problems...... of the instances, our lower bound was an improvement of the currently best-known. Lastly, we compared our decomposition to the model without the decomposition on an additional six instances, which are much larger than the other 32. To our knowledge, this was the first time that lower bounds were calculated...

  9. DIPLOMA PROJECT TEAM WORK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    V. S. Kruglyk

    2014-04-01

    Full Text Available During the work performance students should get the maximal approach to the process of real project execution, so the project should include the need to use the latest technology, integration of data or services with different developments, architecture design, interaction of the team members and others. Implementation of graduation projects is the useful activity for the acquisition and consolidation of key IT competencies. Since the task of educational projects is maximal close to real one, students participate almost in all typical stages of commercial product’s development, and do so successfully. This is also confirmed practically: students, who were actively engaged in some projects at the university, have key positions in IT companies of the city and country after that. The main objective of the paper is to describe the organization of a common group students’ work on a degree project, implementation peculiarity of such projects, recommendations for improving the quality of projects. Thus, the paper is devoted to the peculiarities of the joint students’ work on a project during diploma execution in IT specialties, as the final part of the acquisition and consolidation process of key IT competencies of future programmers. The problem of choosing work topic, project concept, work organization in a group, implementation process organization has been considered. Also the specific stages of software development have been considered: development of interface, choice of technology, product quality, project disposal to the next developers, project completion.

  10. Project Work in Networked Distance Education

    DEFF Research Database (Denmark)

    Knudsen, Morten; Helbo, Jan; Jensen, Lars Peter

    2000-01-01

    -study, whereas the project study form is based on collaboration and dialogue. Consequently, successful implementation of project work in distance education requires extensive utilisation of new information and communication technology. In this paper the experiences of project work in a new Master of Industrial...... devoted to courses and the other half to project work. A computer conference system, LuvitÒ provides facilities for the courses, as well as structured synchronous and asynchronous communication. Eight times per year two-day seminars are held at the university for intensive lectures, project work......Problem oriented project work has been the foundation for the educational system at Aalborg University since its start 25 years ago. The duration of each student project is one semester, and the students spend half of their time working on the project in groups of typically 5-6 persons...

  11. Optimization of airport bus timetable in cultivation period considering passenger dynamic airport choice under conditions of uncertainty

    NARCIS (Netherlands)

    Lu, J.; Yang, Z.; Timmermans, H.J.P.; Wang, W.

    2016-01-01

    An airport bus service, which is newly introduced in a multi-airport region, commonly leads to a gradually increasing market share of airports until a new state of equilibrium is reached. With the goal of speeding up and enlarging the increase in market share, this paper proposes a timetable

  12. Esmeralda project for studying extensive sodium fire

    International Nuclear Information System (INIS)

    Sophy, Y.M.; Roy, D.; Bentz, A.; Gerosa, A.; Noel, H.

    1979-01-01

    This paper describes the Esmeralda Project for studying extensive fires involving up to 70 metric tons of sodium. The motivations which prompted the decision to create this research facility are related to construction of the Super-Phenix breeder reactor and to the scale effect problems posed by the use of very large quantities of sodium. Information is included on the dimensions of the installation, the objectives of the project, the means to be employed, the timetable to be followed, and the organization which was created for this project within the context of Franco-Italian cooperation

  13. The ESMERALDA project for studying extensive sodium fire

    International Nuclear Information System (INIS)

    Sophy, Y.M.; Roy, D.; Noel, H.; Gerosa, A.

    1979-08-01

    This paper describes the Esmeralda Project for studying extensive fires involving up to 70 metric tons of sodium. The motivations which prompted the decision to create this research facility are related to construction of the Super-Phenix breeder reactor and to the scale effect problems posed by the use of very large quantities of sodium. Information is included on the dimensions of the installation, the objectives of the project, the means to be employed, the timetable to be followed, and the organization which was created for this project within the context of Franco-Italian cooperation

  14. RadWorks Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The RadWorks project's overarching objective is the maturation and demonstration of affordable, enabling solutions to the radiation-related challenges presented to...

  15. Project Work in Networked Distance Education

    DEFF Research Database (Denmark)

    Knudsen, Morten; Helbo, Jan; Jensen, Lars Peter

    2000-01-01

    devoted to courses and the other half to project work. A computer conference system, LuvitÒ provides facilities for the courses, as well as structured synchronous and asynchronous communication. Eight times per year two-day seminars are held at the university for intensive lectures, project work......Problem oriented project work has been the foundation for the educational system at Aalborg University since its start 25 years ago. The duration of each student project is one semester, and the students spend half of their time working on the project in groups of typically 5-6 persons....... As the experience since then has proven this to be a very successful innovation in higher education [1], it seems to be an obvious idea also to base our new distance educations on the project study form. Traditionally, however, distance education has been characterized by one-way communication and self...

  16. Creatvity in Project Work

    DEFF Research Database (Denmark)

    Bjørner, Thomas; Kofoed, Lise B.; Bruun-Pedersen, Jon Ram

    2012-01-01

    that they are creative during all stages in the project work. However, it is also significant that the Medialogy students believe that they are more creative in the beginning of their projects and during the design and implementation stages, whereas the analysis is a less creative part. In general, the Medialogy...

  17. High-Speed Rail Train Timetabling Problem: A Time-Space Network Based Method with an Improved Branch-and-Price Algorithm

    Directory of Open Access Journals (Sweden)

    Bisheng He

    2014-01-01

    Full Text Available A time-space network based optimization method is designed for high-speed rail train timetabling problem to improve the service level of the high-speed rail. The general time-space path cost is presented which considers both the train travel time and the high-speed rail operation requirements: (1 service frequency requirement; (2 stopping plan adjustment; and (3 priority of train types. Train timetabling problem based on time-space path aims to minimize the total general time-space path cost of all trains. An improved branch-and-price algorithm is applied to solve the large scale integer programming problem. When dealing with the algorithm, a rapid branching and node selection for branch-and-price tree and a heuristic train time-space path generation for column generation are adopted to speed up the algorithm computation time. The computational results of a set of experiments on China’s high-speed rail system are presented with the discussions about the model validation, the effectiveness of the general time-space path cost, and the improved branch-and-price algorithm.

  18. Interdisciplinary Problem Oriented Project Work

    DEFF Research Database (Denmark)

    Blomhøj, Morten; Kjeldsen, Tinne Hoff

    2018-01-01

    In this chapter, we analyze the problem oriented project work practiced at the Bachelor Study Program in Natural Science (Nat Bach) at Roskilde University (RU) as a learning environment for developing students’ mathematical modelling competence. The projects are conducted in a rather sophisticated...... and radical learning environment grounded on the four pedagogical key principles of, problem orientation, participant directed group work, interdisciplinarity and exemplarity. We illustrate and discuss the interplay between the aim of developing the students’ modelling competence on the one hand...

  19. Restucturing the Project Work Format

    DEFF Research Database (Denmark)

    Dupont, Søren

    2015-01-01

    The chapter is based on an evaluation of a pedagogical experiment at Roskilde University, the Antology Experiment. The objective of the experiment was to develop and expand the framework for project work through the production of anthologies compiled collectively by a number of project groups....... The novel aspects of the Anthology Experiment were most notably its magnitude and complexity. In this experiment the groups were totalling some 50 students who were working together. The experiment used a well-known publishing format from research, namely the anthology form, which usually focuses...... on a specific research topic and includes contributions from various researchers. In the Anthology Experiment, the project groups could be viewed as ‘research units’ that produce the contributions to the anthology. The complexity of the experiment offered challenges, both for students and supervisors...

  20. Performance comparison of genetic algorithms and particle swarm optimization for model integer programming bus timetabling problem

    Science.gov (United States)

    Wihartiko, F. D.; Wijayanti, H.; Virgantari, F.

    2018-03-01

    Genetic Algorithm (GA) is a common algorithm used to solve optimization problems with artificial intelligence approach. Similarly, the Particle Swarm Optimization (PSO) algorithm. Both algorithms have different advantages and disadvantages when applied to the case of optimization of the Model Integer Programming for Bus Timetabling Problem (MIPBTP), where in the case of MIPBTP will be found the optimal number of trips confronted with various constraints. The comparison results show that the PSO algorithm is superior in terms of complexity, accuracy, iteration and program simplicity in finding the optimal solution.

  1. Team work on international projects

    International Nuclear Information System (INIS)

    Hayfield, F.

    1983-01-01

    A successful team will result in Project efficiency and so lead to a better achievement of the Project objectives. Such a team will be self-motivating and have a high level of morale. An effective team will also create a better context for transfer of know-how and so better prepare its members for greater roles on future Project teams. The nature of Project work forces the process of team building to recognize several facts of life. A Project team can have a life as short as one year and as long as ten years. A team usually consists of people on temporary transfer from different departments yet retaining a link of some sort to their departments of origin. It may consist of members of one company only or of several as in a joint-venture and may include Client personnel. On International Projects, the members of a team may have different nationalities and be working in a language foreign to many of them. Many of the Project people may be expatriates to the Project area on a bachelor or on a married status well away from their head or usual office. Team building is a complex organizational and human process, with no mathematical formula for the ideal solution. It starts with the selection of the right Project Manager who should be a leader, a technocrat manager and an integrator all at the same time. The Project Manager must have the authority to create the organizational and human climate that will motivate to a maximum each member of the team. Each member must understand clearly his role and realize that this contribution to the Project will influence his career development. Loyalty to the Project Manager must be possible and the Departmental Manager has to recognize this necessity. This presentation will indicate the basic steps of a team building process on a typical major international Project

  2. Problem-Oriented Project Work

    DEFF Research Database (Denmark)

    Olsen, Poul Bitsch; Pedersen, Nils Kaare

    This book is meant to support problem-oriented learning activities. Problem-orientation concerns the reasoning about lack of knowledge, while project work includes the ethnomethods that are practiced when collectives produce scientific knowledge. This book reflects particular methods related...

  3. Group Organized Project Work in Distance Education

    DEFF Research Database (Denmark)

    Helbo, Jan; Knudsen, Morten; Jensen, Lars Peter

    2001-01-01

    Project organized problem based learning is a successful concept for on-campus education at Aalborg University. Recently this "Aalborg concept" has been used in networked distance education as well. This paper describes the experiences from two years of Internet-mediated project work in a new...... Master of Information Technology education. The main conclusions are, that the project work is a strong learning motivator, enhancing peer collaboration, for off-campus students as well. However, the concept cannot be directly transferred to off-campus learning. The main reasons are that the students...... must communicate electronically, and that they are under a fierce time strain, studying part time and typically with a full time job and a family. In this paper, the main problems experienced with group organized project work in distance education are described, and some possible solutions are listed...

  4. Team- and project work in engineering practices

    DEFF Research Database (Denmark)

    Buch, Anders; Andersen, Vibeke

    2015-01-01

    in teamwork practices, and, thirdly, how team- and project work affect engineering professionalism and collaborative work practices. A practice theoretical framework informs the analysis. Teamwork is investigated as a phenomenon enacted through the sayings, doings and relatings of practitioners in landscapes......In this paper we investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals. The paper investigates how professional engineering practices are enacted in two engineering...... consultancy companies in Denmark where teamwork has been or is an ideal for organizing work. Through a practice-based lens the article sets out to investigate, firstly, how discourses about teamand project work affect engineering work practices, secondly, how technology-mediated management is reconciled...

  5. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  6. Tendances Carbone no. 73 'Reforming the EU ETS, Act I: pushing back the allowance auction timetable'

    International Nuclear Information System (INIS)

    Alberola, Emilie

    2012-01-01

    Among the publications of CDC Climat Research, 'Tendances Carbone' bulletin specifically studies the developments of the European market for CO 2 allowances. This issue addresses the following points: On July 25 2012, the European Commission presented its first reform to re-calibrate the supply of allowances in EU ETS, via two proposals aimed at amending the ETS Directive and reviewing the auction regulations, in order to alter the auctioning timetable during the period between 2013 and 2020, with no legal risk. The aim is to withdraw a certain amount of the allowances auctioned in 2013, 2014 and 2015, in order to reintroduce that amount after 2018

  7. Brokdorf nuclear power station: Construction scheduling and deadline control

    International Nuclear Information System (INIS)

    Lembcke, U.D.F.

    1986-01-01

    Scheduling, especially deadline control, for all installations of the Brokdorf nuclear power station was carried out centrally by the Project Management of Kraftwerk Union AG. 130 timetables encompassing some 13,000 activities were handled, which were interconnected and linked to 189 timetables (approx. 18,000 activities) from various specialized sections by means of data processing systems. Much space in time scheduling was taken by controls of software processing, especially of the preliminary inspection documents in the piping sector and of working documents for construction management in the control systems area. (orig.) [de

  8. Work Project Report

    CERN Document Server

    Sallinen, Roosa-Maria

    2015-01-01

    I worked in High Power Converters section (HPC). My supervisors were Karsten Kahle and Charles-Mathieu Genton. Our team consisted of us and Francisco Rafael Blanquez Delgado who also helped me if I had any problems. The team’s main assignment is to design the new Static Var Compensator (SVC) for MEQ59 in Meyrin. The idea is to standardise all the SVCs needed at CERN in order to make the design, installation and maintenance easier and more cost effective. This report describes my project at CERN.

  9. Bus Timetabling as a Fuzzy Multiobjective Optimization Problem Using Preference-based Genetic Algorithm

    Directory of Open Access Journals (Sweden)

    Surafel Luleseged Tilahun

    2012-05-01

    Full Text Available Transportation plays a vital role in the development of a country and the car is the most commonly used means. However, in third world countries long waiting time for public buses is a common problem, especially when people need to switch buses. The problem becomes critical when one considers buses joining different villages and cities. Theoretically this problem can be solved by assigning more buses on the route, which is not possible due to economical problem. Another option is to schedule the buses so that customers who want to switch buses at junction cities need not have to wait long. This paper discusses how to model single frequency routes bus timetabling as a fuzzy multiobjective optimization problem and how to solve it using preference-based genetic algorithm by assigning appropriate fuzzy preference to the need of the customers. The idea will be elaborated with an example.

  10. Mixtures of beta distributions in models of the duration of a project affected by risk

    Science.gov (United States)

    Gładysz, Barbara; Kuchta, Dorota

    2017-07-01

    This article presents a method for timetabling a project affected by risk. The times required to carry out tasks are modelled using mixtures of beta distributions. The parameters of these beta distributions are given by experts: one corresponding to the duration of a task in stable conditions, with no risks materializing, and the other corresponding to the duration of a task in the case when risks do occur. Finally, a case study will be presented and analysed: the project of constructing a shopping mall in Poland.

  11. Team and Project Work in Engineering Practices

    Directory of Open Access Journals (Sweden)

    Anders Buch

    2015-11-01

    Full Text Available In this article, we investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals. The article investigates how professional engineering practices are enacted in two engineering consultancy companies in Denmark where teamwork has been or is an ideal for organizing work. Through a practice-based lens, the article sets out to investigate, firstly, how discourses about team and project work affect engineering work practices; secondly, how technologymediated management is reconciled in teamwork practices; and thirdly, how team and project work affect engineering professionalism and collaborative work practices. A practice theoretical framework informs the analysis. Teamwork is investigated as a phenomenon enacted through the sayings, doings and relatings of practitioners in landscapes of practices and the interconnectedness of the practices is traced through the setup of specific ecologies in the sites.

  12. Supporting Project Work with Information Technology

    DEFF Research Database (Denmark)

    Heilesen, Simon

    2015-01-01

    University problem-oriented project work is based. However, in implementing and integrating the new technologies in academic practices, a number of challenges have had to be addressed. This chapter discusses four of these challenges. The first is to provide a physical and virtual framework for learning......Like so many other institutions, Roskilde University has had to adapt to the new realities brought about by the rapid developments in information and communication technology (ICT). On the whole, ICT tools have proven to be helpful in supporting and developing the work forms on which Roskilde...... activities. The second is to direct student use of ICT in terms of making systems available and teaching academic computing. The third challenge is to supervise and conduct project work online and in blended learning environments. Finally, one must find a way to exploit the potentials of ICT in problem...

  13. Supporting Project Work with Information Technology

    DEFF Research Database (Denmark)

    Heilesen, Simon

    2015-01-01

    University problem-oriented project work is based. However, in implementing and integrating the new technologies in academic practices, a number of challenges have had to be addressed. This chapter discusses four of these challenges. The first is to provide a physical and virtual framework for learning...... activities. The second is to direct student use of ICT in terms of making systems available and teaching academic computing. The third challenge is to supervise and conduct project work online and in blended learning environments. Finally, one must find a way to exploit the potentials of ICT in problem......Like so many other institutions, Roskilde University has had to adapt to the new realities brought about by the rapid developments in information and communication technology (ICT). On the whole, ICT tools have proven to be helpful in supporting and developing the work forms on which Roskilde...

  14. Timetable-based simulation method for choice set generation in large-scale public transport networks

    DEFF Research Database (Denmark)

    Rasmussen, Thomas Kjær; Anderson, Marie Karen; Nielsen, Otto Anker

    2016-01-01

    The composition and size of the choice sets are a key for the correct estimation of and prediction by route choice models. While existing literature has posed a great deal of attention towards the generation of path choice sets for private transport problems, the same does not apply to public...... transport problems. This study proposes a timetable-based simulation method for generating path choice sets in a multimodal public transport network. Moreover, this study illustrates the feasibility of its implementation by applying the method to reproduce 5131 real-life trips in the Greater Copenhagen Area...... and to assess the choice set quality in a complex multimodal transport network. Results illustrate the applicability of the algorithm and the relevance of the utility specification chosen for the reproduction of real-life path choices. Moreover, results show that the level of stochasticity used in choice set...

  15. Project development for mining-metallurgical complexes for production of uranium concentrates - an analysis and a methodology

    International Nuclear Information System (INIS)

    Ajuria G, S.; Blanco P, B.; Pena A, J.; Manzanera Q, C.

    1978-10-01

    Activities comprising the development of a project for a mining-metallurgical complex for production of uranium concentrates, from sampling and evaluation of an orebody until plant start-up, are analyzed. The analysis of the orebody, characterization of the ore, bench scale and pilot plant metallurgical studies, environmental studies and economic analyses of the project are described. The mining project and mine preparation and engineering and construction of the plant are reviewed in less detail. The estimated time lapse for the development of a typical project under ideal conditions is 66 months. A bar diagram is included showing an approximate timetable for each activity. (author)

  16. Etan hydropower project spurs industrial, agricultural growth of region

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    Located in Hongdu commune, Xincheng County, Guangxi Zhuang Autonomous Region, on the middle reaches of the Hongshui River, the Etan hydroelectric power station was begun in 1977 and began to generate power in April 1981. The Etan hydroelectric power station is a run-off type, low waterhead medium-sized power station. It has an installed capacity of 60,000 kW for an average yearly power output of 328 million kWh. The main structure of the power station includes a water diversion canal, a water intake gate, a main machinery building and a switching station. The main machinery building is located on the downstream side of the dam on an overhanging cliff. With a construction area of only 5000 m/sup 2/, work was very difficult due to the restricted work area and transportation problems. By strengthening construction management and promoting technical innovation some 670,000 yuan were saved for the state and construction time was accelerated. This assured the completion of the construction and installation of the main parts of the project according to timetables and design requirements. The successful construction of the Etan hydroelectric power station marks another step in amassing experience in the harnessing of the Hongshui River. The project will have a major impact on the growth of industry and agriculture in Guangxi and on the buildup of the minority regions.

  17. Work Breakdown Structures The Foundation for Project Management Excellence

    CERN Document Server

    Norman, Eric S; Fried, Robert T

    2011-01-01

    Understand and apply new concepts regarding Work Breakdown Structures The Work Breakdown Structure (WBS) has emerged as a foundational concept and tool in Project Management. It is an enabler that ensures clear definition and communication of project scope while performing a critical role as a monitoring and controlling tool. Created by the three experts who led the development of PMI's Practice Standard for Work Breakdown Structures, Second Edition, this much-needed text expands on what the standard covers and describes how to go about successfully implementing the WBS within the project life

  18. Constructing new working practices through project narratives

    NARCIS (Netherlands)

    Veenswijk, M.B.; Berendse, M.

    2008-01-01

    In this article we focus on the (internal and external) dynamics of New Public Management (NPM) in the daily life of project management. We concentrate on the ways NPM concepts work out in the realities of project actors. Based on recent research within the Dutch infrastructure sector, we analyse

  19. Co-ordinated research project: Ingestion and organ content of trace elements of importance in radiological protection (CRP: E4.30.08). Reference Asian man project, phase 2

    International Nuclear Information System (INIS)

    2000-01-01

    The Second Research Coordination Meeting for the Co-ordinated Research Project (CRP) on 'Ingestion and Organ Content of Trace Elements of Importance in Radiological Protection: Reference Asian Man Project, Phase 2' was held at the China Institute for Radiation Protection (CIRP) in Taiyuan, People's Republic of China. During the first technical Session, an overview of the current status of the CRP was presented by the IAEA technical officer, Dr. Parr, and the responsible officer of the Central Reference Laboratory (NIRS, Japan), Dr. Kawamura. They drew attention to the agreed programme of work, as described in the project documentation, and the timetable foreseen for the CRP as summarized in table 1. In general, they concluded that the achievements of the CRP to-date appear to be good, particularly in relation to sample collection (in most countries) and quality control (the development of appropriate reference materials). However, some aspects of the work appear to be a little behind schedule, particularly (1) the final stages of preparation of total diet samples (because of delays in providing a suitable food blender), (2) the analysis of some of the elements of first priority (because of the non-availability, until now, of suitable analytical reference materials), and (3) in some countries, the collection of autopsy specimens. One country (Malaysia) has experienced considerable difficulties in implementing the project due to the retirement of the former Chief Scientific Investigator. For this reason it was unfortunately not possible for the Malaysian representative to be present at the RCM

  20. Project Work in Social Biology at GCE Advanced Level

    Science.gov (United States)

    Gadd, P.; Smith, S. Tyrell

    1977-01-01

    The system by which projects are submitted, modified, and approved is outlined and an indication is given of the standards and quantity of work expected. Criteria on which assessment is based are explained, the range of individual studies is summarized, and cases for and against project work are given. (Author/AJ)

  1. Teaching mathematical modelling through project work

    DEFF Research Database (Denmark)

    Blomhøj, Morten; Kjeldsen, Tinne Hoff

    2006-01-01

    are reported in manners suitable for internet publication for colleagues. The reports and the related discussions reveal interesting dilemmas concerning the teaching of mathematical modelling and how to cope with these through “setting the scene” for the students modelling projects and through dialogues......The paper presents and analyses experiences from developing and running an in-service course in project work and mathematical modelling for mathematics teachers in the Danish gymnasium, e.g. upper secondary level, grade 10-12. The course objective is to support the teachers to develop, try out...... in their own classes, evaluate and report a project based problem oriented course in mathematical modelling. The in-service course runs over one semester and includes three seminars of 3, 1 and 2 days. Experiences show that the course objectives in general are fulfilled and that the course projects...

  2. Individual activities as an integrated part of project work - an innovative approach to project oriented and problem-based learning POPBL

    DEFF Research Database (Denmark)

    Moesby, Egon; Winther, Hans Henrik; Kørnøv, Lone

    2006-01-01

    in an individual activity to subsequently be separately assessed. The results of the individually oriented project work form the platform for final work with the project as a team. The students in each team are expected to evaluate the individual solutions and select the one solution to work on in the final phases......In this paper, the authors describe and, on the basis of a recently conducted survey, evaluate a way to increase student learning through the introduction of an individual project activity to the project oriented and problem-based and team-based project work - POPBL. This can be achieved not just...... by adding an individual activity outside or parallel to the project work, but by having the individual activity embedded as an integrated part of the overall team-based project work. In what the authors have deemed the extended project model, students work individually in the solution phase of the project...

  3. Newsletter: work of the Committee and projects funded

    Energy Technology Data Exchange (ETDEWEB)

    1974-12-01

    Information about the work of the Committee is summarized. It has developed a series of project priorities. These are as follows in order of priority: projects that determine current and future energy demand; projects concerned with the conservation and more efficient use of energy; projects concerned with the assessment of indigenous energy resources; projects concerned with the assessment of the human, financial, and organizational resources for increasing energy production and use; projects concerned with economic, technological, and environmental aspects of energy use and production over the next 15 years and beyond the next 15 years. In addition, environmental and sociological projects are considered to be very important. All projects are required to have included consideration of environmental and sociological issues but there may also be specific environmental projects such as the one related to cooling water pond modelling (MCW)

  4. FINANCIAL STUDY OF AN INVESTMENT PROJECT IN ALGERIA: CREATION OF A COMPANY WITHIN THE FRAMEWORK OF THE NATIONAL FUNDSUPPORT FOR YOUTH EMPLOYMENT (FNSEJ)

    OpenAIRE

    Dr Lyes OUABDESSELAM

    2017-01-01

    This article proposes a financial study of a project to create a commercial enterprise through the scheme proposed by the National Agency for Youth Employment Support (ANSEJ). The company is a testing and analysis laboratory. In this study we have prepared a complete financial package and we have budgeted this project over the entire amortization period of the investment credit in accordance with the timetable set by the support system for young entrepreneurs to set up a business in Algeria. ...

  5. A project management focused framework for assuring quality work processes

    Energy Technology Data Exchange (ETDEWEB)

    Gamsby, S.O.; Mize, J.D. [Allied Signal, Inc., Albuquerque, NM (United States). Federal Mfg. and Technologies; Reid, R.A. [New Mexico Univ., Albuquerque, NM (United States)

    1996-10-01

    Federal Manufacturing & Technologies/New Mexico (FM&T/NM) of AlliedSignal is an organization of approximately 300 associates providing operations support, engineering, and other technical services for DOE, New Mexico`s National Laboratories, etc. Work performed is primarily project-oriented and ranges from executing a major long-term contract for retrofitting and maintaining a large fleet of escort vehicles to creating a single, small, prototype electronic device for measuring radiation in a unique environment. FM&T/NM is functionally organized and operates in a classic matrix format with functional departments providing personnel with technical expertise, necessary physical resources, and administrative support to several project-based groups. Like most matrix-based organizations that provide support to diverse customers, FM&T/NM has encountered problems that occur when a group of project managers is expected to work together in using and scheduling a shared set of limited resources for the good of the organization as a whole. The framework for managing projects that we present focuses on developing, understanding, and managing the relationships between the functional organization structure, the system of work processes, and the management of projects. FM&T/NM retains its functional structure which primarily assigns personnel to work processes. The evolving role of the process leader focuses primarily on designing, managing, and improving the process, and the interactions among the subprocesses. The project manager is responsible for (1) translating customer requirements into product specifications, (2) determining the sequence of activities needed to meet project goals, (3) scheduling the required work processes, (4) monitoring project progress, (5) providing liaison between the customer and process leaders, and (6) having the desired product and/or service delivered to a satisfied customer in a timely manner.

  6. Siberian Chemical Combine laboratory project work plan, fiscal year 1999

    International Nuclear Information System (INIS)

    Morgado, R.E.; Acobyan, R.; Shropsire, R.

    1998-01-01

    The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites' input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves

  7. 49 CFR 30.13 - Restrictions on Federal public works projects: Certification.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Restrictions on Federal public works projects... WORKS CONTRACTS TO SUPPLIERS OF GOODS AND SERVICES OF COUNTRIES THAT DENY PROCUREMENT MARKET ACCESS TO U.S. CONTRACTORS § 30.13 Restrictions on Federal public works projects: Certification. As prescribed...

  8. 49 CFR 30.15 - Restrictions on Federal public works projects.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Restrictions on Federal public works projects. 30... CONTRACTS TO SUPPLIERS OF GOODS AND SERVICES OF COUNTRIES THAT DENY PROCUREMENT MARKET ACCESS TO U.S. CONTRACTORS § 30.15 Restrictions on Federal public works projects. The contracting officer shall insert the...

  9. Cesium legacy safety project management work plan

    International Nuclear Information System (INIS)

    Durham, J.S.

    1998-01-01

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell)

  10. Pilot Project Technology Business Case: Mobile Work Packages

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Ken [Idaho National Lab. (INL), Idaho Falls, ID (United States); Lawrie, Sean [ScottMadden, Inc., Raleigh, NC (United States); Niedermuller, Josef [ScottMadden, Inc., Raleigh, NC (United States)

    2015-05-01

    Performance advantages of the new pilot project technologies are widely acknowledged, but it has proven difficult for utilities to derive business cases for justifying investment in these new capabilities. Lack of a business case is often cited by utilities as a barrier to pursuing wide-scale application of digital technologies to nuclear plant work activities. The decision to move forward with funding usually hinges on demonstrating actual cost reductions that can be credited to budgets and thereby truly reduce O&M or capital costs. Technology enhancements, while enhancing work methods and making work more efficient, often fail to eliminate workload such that it changes overall staffing and material cost requirements. It is critical to demonstrate cost reductions or impacts on non-cost performance objectives in order for the business case to justify investment by nuclear operators. The Business Case Methodology (BCM) was developed in September of 2015 to frame the benefit side of II&C technologies to address the “benefit” side of the analysis—as opposed to the cost side—and how the organization evaluates discretionary projects (net present value (NPV), accounting effects of taxes, discount rates, etc.). The cost and analysis side is not particularly difficult for the organization and can usually be determined with a fair amount of precision (not withstanding implementation project cost overruns). It is in determining the “benefits” side of the analysis that utilities have more difficulty in technology projects and that is the focus of this methodology. The methodology is presented in the context of the entire process, but the tool provided is limited to determining the organizational benefits only. This report describes a the use of the BCM in building a business case for mobile work packages, which includes computer-based procedures and other automated elements of a work package. Key to those impacts will be identifying where the savings are

  11. Neural Networks Relating Alloy Composition, Microstructure, and Tensile Properties of α/ β-Processed TIMETAL 6-4

    Science.gov (United States)

    Collins, Peter C.; Koduri, Santhosh; Welk, Brian; Tiley, Jaimie; Fraser, Hamish L.

    2013-03-01

    Bayesian neural networks have been developed, which relate composition, microstructure, and tensile properties of the alloy TIMETAL 6-4 (nominal composition: Ti-6Al-4V (wt pct) after thermomechanical processing (TMP) in the two-phase ( α + β)-phase field. The developed networks are able to make interpolative predictions of properties within the ranges of composition and microstructural features that are in the population of the database used for training and testing of the networks. In addition, the neural networks have been used to conduct virtual experiments which permit the functional dependencies of properties on composition and microstructural features to be determined. In this way, it is shown that in the microstructural condition resulting from TMP in the two-phase ( α + β) phase field, the most significant contribution to strength is from solid solution strengthening, with microstructural features apparently influencing the balance of a number of properties.

  12. A feeling for Systems Development Work - Design of the ROSA project

    DEFF Research Database (Denmark)

    Bødker, Susanne; Greenbaum, Joan

    1988-01-01

    This article is based on the design of a research project that will look at intuition, learning processes, language and roles in the development of computer systems. The research project, called ROSA (a Danish acronym for Roles and Cooperation in Systems Development) grew out of our interest...... in the informal working practices among systems developers, because it is these informal working relationships that are most often overlooked in research about computer science methods and tools. The project applies a gender perspective to look at the informal work relations of systems developers. The concept...

  13. Exploring organisational competences in Human Factors and UX project work: managing careers, project tactics and organisational strategy.

    Science.gov (United States)

    Furniss, Dominic; Curzon, Paul; Blandford, Ann

    2018-06-01

    Organisational competence in Human Factors and UX (user experience) has not been looked at before despite its relevance to project success. We define organisational competence as the collective competence of the individuals, bringing together their complementary abilities to deliver an outcome that is typically more than the sum of its parts. Twenty-two UX and Human Factors practitioners were interviewed about their project work in two contrasting domains: web design and safety-critical systems to explore organisational competences. Through doing a FRAM analysis, 29 functions and 6 main areas of competences were identified: the central project process; the process of learning about the problem; maintaining and developing client relations; staff development; evolving practices; and the management of documentation for audit and quality control. These dynamic and situated competences form a web of interactions. Managing competences is essential for project success. Implications for managing careers, project tactics and organisational strategy are discussed. Practitioner Summary: Organisational competences impact how routine and non-routine project work is performed, but these have received little attention in the literature. Six key areas of competences in Human Factors and UX project work were identified from practitioner interviews. Managing combinations of adaptive competences is important for developing careers, project tactics and organisational strategies.

  14. IMPORTANCE OF EARNED VALUE METHOD (EVA IN THE PERFORMANCE ANALYSIS OF PROJECTS

    Directory of Open Access Journals (Sweden)

    MARGARITA JANESKA

    2016-04-01

    Full Text Available The economics of the projects is an important process in the project management. Effective control of projects is based on appropriate methods for monitoring, and the entire project, the timetable, cost, quality and risk. Unlike accounting aspects in project management are looking for information that allow insight into the status and trends of financial progress of the project. Such information provide a method of earned value. It is a key component for assessing the actual performance of the project. The method of earned value is a better indicator of the progress of the project in comparison to the classical method of comparing planned and actual costs. This method shows the profit in relation to actual costs at a specific time point. This method is the basis for calculating the index of the project performance. In this sense, MS Project provides many opportunities for quality control and monitoring of the realization of the projects. In this study will be described the architecture of this method, outlined the benefits of the application of this method, and the basic criteria that should satisfy project management to be able to apply it.

  15. Collaborative Projects: A Study of Paired Work in a Malaysian University.

    Science.gov (United States)

    Holmes, Richard

    2003-01-01

    Examines the project work of university students in a TESOL (Teaching of English as a Second Language) program in Malaysia. Compares phonetics and phonology projects completed by students working in pairs with those completed by students alone and reports student attitudes and strategies. (Author/LRW)

  16. 36 CFR 327.30 - Shoreline Management on Civil Works Projects.

    Science.gov (United States)

    2010-07-01

    ... ADMINISTERED BY THE CHIEF OF ENGINEERS § 327.30 Shoreline Management on Civil Works Projects. (a) Purpose. The... this regulation, shoreline management plans are not required for those projects where construction was... approval, one copy of each project Shoreline Management Plan will be forwarded to HQUSACE (CECW-ON) WASH DC...

  17. CRITICAL TEACHING WORK AS DIMENSION OF UNIVERSITY PROJECT

    Directory of Open Access Journals (Sweden)

    Roberto Leher

    2014-06-01

    Full Text Available The article analyzes the heteronomy of academic work in Brazil, particularly public higher education. It discusses the meaning of rupture of the national-developmentalist project by the irruption of the corporate-military coup and the combined process of coercion (AI-5/1968 and Decree 477/1969 and of the subordination of research and postgraduate studies to monopolistic capitalism in counterreformation of 1968, through programs to encourage science and technology geared to the concerns of bourgeois fractions that sustained the regime. Facing the processes of dispossession and alienation of academic work in the dictatorship, the study examines the organization of teaching movement, its first strikes and the centrality given to career university project of ANDES. Finally, it presents as deepening the dependent capitalism over the last three decades reoriented public university and private higher education, indicating effects on teaching work and the struggles for affirmation of the public sphere as antimercantile.

  18. Review of CHP projections tp 2010

    Energy Technology Data Exchange (ETDEWEB)

    Choudhury, W.

    2003-07-01

    This report summarises the findings of a study examining market conditions for combined heat and power since 2000 and assessing the commercial position of cogeneration (CHP) in order to provide advice on likely distributed generation in relation to technology, location and commissioning timetables. Details are given of the modelling of the development of 'good quality' CHP by Cambridge Econometrics (CE), and the work carried out by ILEX updating the CE study. Modelling assumptions, market conditions for CHP since the CE study, the effect of market conditions on CE modelling assumptions, justified changes in assumptions, and evaluation of likely CHP capacity to 2010 are discussed.

  19. Behavioural changes experienced by contract managers while working on remote project sites

    OpenAIRE

    2012-01-01

    M.B.A. This research project is concerned with the behavioural changes of contract managers while working on 'remote' project sites. While working on such a project, the researcher became aware that the behaviour of certain contract managers changed over the course of the project, and that this behaviour was not the same as they demonstrated when at home or in the office environment. In many instances these behavioural changes were of a negative nature, the consequences of which often resu...

  20. Waste management project fiscal year 1998 multi-year work plan WBS 1.2

    International Nuclear Information System (INIS)

    Slaybaugh, R.R.

    1997-08-01

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project

  1. Waste management project fiscal year 1998 multi-year work plan WBS 1.2

    Energy Technology Data Exchange (ETDEWEB)

    Slaybaugh, R.R.

    1997-08-29

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project.

  2. Mirage project. Second summary progress report (Work period January to December 1984)

    International Nuclear Information System (INIS)

    Come, B.

    1985-01-01

    This report summarizes the second year of work (1984) in the CEC project MIRAGE on migration of radionuclides in the geosphere. It complements CEC reports EUR 9304 (Description of the project) and EUR 9543 (Works carried out in 1983) on the same topic

  3.  Project Management as a Global Trend for Organization Work

    DEFF Research Database (Denmark)

    Kampf, Constance

    in multination and global companies, understanding the power of visual rhetoric, genre and writing processes in the context of project management documentation can be an advantage for technical communicators.  In addition, project management tools and online documentation spaces are objects which cross...... Project Management as a Global Trend for Organization Work: Implications for Technical Communication Project Management tools and processes offer a visual approach to producing knowledge about a project in order to complete it.  As project management practices are used with increasing frequency......-cultural teams use to function.  This presentation will explore the potential of Project Management to be tightly integrated in Technical Communication curricula through a communications approach to project management.  Questions for discussion include: How tightly is project management integrated into different...

  4. The net effects of the Project NetWork return-to-work case management experiment on participant earnings, benefit receipt, and other outcomes.

    Science.gov (United States)

    Kornfeld, R; Rupp, K

    2000-01-01

    The Social Security Administration (SSA) initiated Project NetWork in 1991 to test case management as a means of promoting employment among persons with disabilities. The demonstration, which targeted Social Security Disability Insurance (DI) beneficiaries and Supplemental Security Income (SSI) applicants and recipients, offered intensive outreach, work-incentive waivers, and case management/referral services. Participation in Project NetWork was voluntary. Volunteers were randomly assigned to the "treatment" group or the "control" group. Those assigned to the treatment group met individually with a case or referral manager who arranged for rehabilitation and employment services, helped clients develop an individual employment plan, and provided direct employment counseling services. Volunteers assigned to the control group could not receive services from Project NetWork but remained eligible for any employment assistance already available in their communities. For both treatment and control groups, the demonstration waived specific DI and SSI program rules considered to be work disincentives. The experimental impact study thus measures the incremental effects of case and referral management services. The eight demonstration sites were successful in implementing the experimental design roughly as planned. Project NetWork staff were able to recruit large numbers of participants and to provide rehabilitation and employment services on a substantial scale. Most of the sites easily reached their enrollment targets and were able to attract volunteers with demographic characteristics similar to those of the entire SSI and DI caseload and a broad range of moderate and severe disabilities. However, by many measures, volunteers were generally more "work-ready" than project eligible in the demonstration areas who did not volunteer to receive NetWork services. Project NetWork case management increased average annual earnings by $220 per year over the first 2 years following

  5. Overview of the ACEX project iodine work

    International Nuclear Information System (INIS)

    Merilo, M.

    1996-01-01

    The ACEX project is an internationally sponsored research program that focuses on several aspects of severe accidents. The areas addressed are iodine behavior in containments, pool scrubbing, molten corium concrete interactions, and ex-vessel core debris coolability. These areas all represent extensions to the previous and current ACE and MACE programs respectively. The ACE-Phase B (iodine) project, and other recent research efforts, have clarified the roles of the important phenomena that influence iodine volatility in reactor containments during severe accidents. The ACE Iodine Chemistry Subcommittee concluded that even though enough data has been generated to support reasonably good quantification of the important phenomena, a few important areas remain where quantification is still uncertain. This is due to a lack of agreement on how to utilize the existing database, as well as the possible absence of critical test and/or property data. Technical resolution of the overall iodine behavior issue is therefore not feasible until these uncertainties are fully assessed and practical solutions have been identified, implemented, and verified. The overall objectives of the ACEX iodine research program are to ensure that the iodine database can be used to predict the airborne concentration of iodine, the conditions for iodine reservoir stability, and to provide a mechanistic understanding for these phenomena. The first phase of this work involves a comprehensive review and interpretation of the existing database in order to formulate practical strategies for dealing with significant uncertainties and/or deficiencies. Several projects are underway involving the effects of organic reactions and structural surface interactions. In addition effort is being expended on standardizing the aqueous iodine kinetics database, specifying useful mass transfer models, and defining methodology for pH prediction. The results of this work are expected to identify where additional data

  6. Reconfiguring Cooperative Work by Visualizing EPR on Large Projected Screens

    DEFF Research Database (Denmark)

    Simonsen, Jesper

    Simonsen, J. (2006): Reconfiguring Cooperative Work by Visualizing EPR on Large Projected Screens, Paper presented at the PDC 2006 workshop on: Reconfiguring Healthcare: Issues in Computer Supported Cooperative Work in Healthcare Environments. Participatory Design Conference, Trento, Italy, August...

  7. Legacy material work-off project

    International Nuclear Information System (INIS)

    Sloan, T.J.; Baker, D.H. IV

    1999-01-01

    Los Alamos National Laboratory (LANL) and its subcontractors recently completed a nine-month legacy material clean-up effort. Legacy materials were defined as chemicals, hazardous, non-hazardous, and both hazardous and radioactive (mixed), that no longer served a programmatic use and had no identified individual owner within the Laboratory. Once personnel identified the legacy materials, the items were transferred to Solid Waste Operation's (EM-SWO) control. Upon completing this process, the responsible division-level manager was required to certify that all non-radioactive hazardous and non-hazardous materials and acceptable mixed legacy materials had been identified and transferred to EM-SWO for proper handling or disposal. The major expense in this project was the cost of actual chemical and radiological analysis. This expense was the result of items not having an identified individual owner. The major benefit of this project is that LANL is now in an excellent position to implement its Integrated Safety Management (ISM) Plan, which requires the implementation of safe work practices, including requirements for removing unused items when vacating workspaces. Effective implementation of ISM will go a long way toward ensuring that legacy materials are no longer an issue at the Laboratory

  8. 13 CFR 305.4 - Projects for design and engineering work.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Projects for design and engineering work. 305.4 Section 305.4 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION... construction Project in a format and in sufficient quantity to permit advertisement and award of a construction...

  9. Case study on project organization

    International Nuclear Information System (INIS)

    Bogen, J.; Schmidt, R.

    1976-01-01

    Illustrated by 3 examples, the main parameters for the planning and erection of nuclear power plants, as they develop step by step during a time-schedule, are explained. Dealt with in particular are alterations in the timetable due to delays. (UA) [de

  10. African Journal of Science and Technology (AJST) TABU SEARCH ...

    African Journals Online (AJOL)

    The timetable is essentially created manually, using a set of tools that can ... This is a long process and a semester timetable takes an average of three ... by the manual systems afterwards. ... No lecturer can teach more than one lecture at the ..... Tabu variations .... The aim of the project was to develop a heuristic algorithm.

  11. Effective utilization of maintenance staff in design and implementation of major project work

    International Nuclear Information System (INIS)

    Wyman, D.; Dingle, J.; Brown, R.

    1995-01-01

    The reorganization of Pickering Nuclear Division some 2 years ago resulted in the formation of the Projects and Modifications department. This department takes an integrated approach to manage all aspects of large projects at Pickering. The integration of Design, Drafting, Procurement, Construction and Operations functions into project teams represents a fundamental change to project management at Pickering. The development of integrated teams has great potential for reducing both the time and cost associated with project implementation, while at the same time improving the quality, and maintainability of the commissioned in service project. The Pickering Rehab organization 1989-1993, established to perform the rehab / retube of Units 3 and 4 had proven that a team environment will produce effective results. The outcome was astounding, critical categories such as Safety, Quality of Work, and Timeliness, had proven the team's effectiveness. The integration of operations maintenance staff into the project work activities is still evolving, and has probably required the most adaptation to change for both the former Construction and Operations organizations. Maximizing the utilization of the maintenance staff in the design and implementation of major project work will prove to be a key to a long term operating success of these projects. This paper will focus in on the effective usage of Maintenance staff in the design and implementation phases of major project work at Pickering, and on the benefits realized using this approach. It will be divided into 5 sections as indicated. 1. Past Project Shortfalls. 2. Benefits of the inclusion of Maintenance staff in the Calandria Vault Rehab Project. 3. Maintenance involvement in the Pickering 'A' Shutdown System Enhancement (SDSE) Project. 4. Challenges resulting from the inclusion of Maintenance staff project teams. 5. Summary. (author)

  12. WORK BREAKDOWN STRUCTURE FORMATION FOR IT-PROJECT OF INFORMATION SYSTEM DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    Виктор Макарович ЛЕВЫКИН

    2015-06-01

    Full Text Available The approach for modeling the structure of IT-works project to create an information system as a forest domain ontology. The main features of information technology to manage such IT-projects.

  13. Innovative Work Practices and Lessons Learned at the N Area Deactivation Project

    International Nuclear Information System (INIS)

    Day, R.S.

    1999-01-01

    This report identifies many of the lessons learned, innovations,and effective work practices that derived from activities supporting the N Area Deactivation Project at the U.S. Department of Energy's (DOE) Hanford Site. The work practices discussed in this report may be applicable and beneficial to similar projects throughout the DOE complex

  14. Topical and working papers on nuclear power capacity projections

    International Nuclear Information System (INIS)

    As a part of the overall work programme of WG. 1, Sub-Group 1A/2A was formed jointly with WG. 2 and given the responsibility for estimating the growth of nuclear power up to the year 2025 and the associated demands for nuclear fuels, heavy water, enrichment and other fuel cycle services. In carrying out the first part of its task, the estimation of nuclear power capacity growth, sub-Group 1A/2A prepared 6 working papers which contain the following information: A critique of recent world energy demand forecasts; world energy demand and installed capacity to the year 2025; nuclear power growth projections 1977-2000 for developing countries; long range world nuclear power growth projections; INFCE forecasts of nuclear generating capacity 1985-2025

  15. Why Phishing Works: Project for an Information Security Capstone Course

    Science.gov (United States)

    Pollacia, Lissa; Ding, Yan Zong; Yang, Seung

    2015-01-01

    This paper presents a project which was conducted in a capstone course in Information Security. The project focused on conducting research concerning the various aspects of phishing, such as why phishing works and who is more likely to be deceived by phishing. Students were guided through the process of conducting research: finding background and…

  16. 29 CFR 30.3 - Equal opportunity standards.

    Science.gov (United States)

    2010-07-01

    ..., assignment of work, job performance, rotation among all work processes of the trade, imposition of penalties... apprenticeship including goals and timetables for women and minorities which has been approved as meeting the... amendment will qualify for this exception only if the goals and timetables for minorities and women for the...

  17. Completion of Launch Director Console Project and Other Support Work

    Science.gov (United States)

    Steinrock, Joshua G.

    2018-01-01

    There were four projects that I was a part of working on during the spring semester of 2018. This included the completion of the Launch Director Console (LDC) project and the completion and submission of a Concept of Operations (ConOps) document for the Record and Playback System (RPS) at the Launch Control Center (LCC), as well as supporting the implementation of a unit in RPS known as the CDP (Communication Data Processor). Also included was my support and mentorship of a High School robotics team that is sponsored by Kennedy Space Center. The LDC project is an innovative workstation to be used by the launch director for the future Space Launch System program. I worked on the fabrication and assembly of the final console. The ConOps on RPS is a technical document for which I produced supporting information and notes. All of this was done in the support of the IT Project Management Office (IT-F). The CDP is a subsystem that will eventually be installed in and operated by RPS.

  18. Work-Family Conflict, Perceived Organizational Support and Professional Commitment: A Mediation Mechanism for Chinese Project Professionals

    OpenAIRE

    Junwei Zheng; Guangdong Wu

    2018-01-01

    Projects are characterized by long working hours, complex tasks and being a kind of temporary organization. As such, work-family conflict is particularly prominent for project employees. This research examined whether and how work-family conflict affects professional commitment among Chinese project professionals. Research hypotheses were developed to explore the relationship between work-family conflict, professional commitment to the project and the mediating effects of perceived organizati...

  19. IMPLEMENTATION OF WORK LIFE QUALITY PROGRAMS WITH THE PROJECT MANAGEMENT MODEL

    Directory of Open Access Journals (Sweden)

    Maria Lúcia Granja Coutinho

    2010-06-01

    Full Text Available The research studies the implementation of Quality of Working Life (QWL programs using project management techniques. Quality of Work Life projects have undergone a constant increase in scope to the point where they currently involve such diverse themes as change in dietary habits, exercise, stress management, socio environmental responsibility, and adult education. The major focus of this research is to analyze the processes and knowledge areas of project management being used to deal with this increased scope. The managerial processes identified were divided into categories of preparation, structuring, execution, and conclusion. The knowledge areas studied were: communication, risks, human resources, and acquisitions. The firms studied included mid to large sized firms located in the north, southeast and south of Brazil. We interviewed managers, directors, CEOs, plant managers, and line managers as part of this effort. The results suggest that the project management practices used were ad hoc and based on day to day needs. They also suggest that sound project management practices are applicable to QWL programs in the firms we studied.

  20. Introducing an Innovative Project Management Framework for First Year Students – Project Work in a PBL Environment

    DEFF Research Database (Denmark)

    Kofoed, Lise B.; Møller, Michael Labovic

    2010-01-01

    Students at Aalborg University (AAU) in Denmark are educated according to the Aalborg Problem Based Learning (PBL) approach which entails working in groups and completing a project each semester. In accordance with this approach students are offered a course – Co-operation, Learning and Project...... in general acknowledge the benefits of thorough project plans and schedules, they often experience difficulties developing them and abiding by them. These experienced difficulties are caused by lack of motivation and competence within this particular area of project management. This paper describes how a new...

  1. Oil field rejuvenation work starts at 14 project sites

    International Nuclear Information System (INIS)

    Petzet, G.A.

    1992-01-01

    This paper reports that the U.S. Department of Energy and oil and gas companies have released more information about a joint effort to rejuvenate aging U.S. oil fields in danger of abandonment. Work is starting on 14 demonstration projects that could recover 21 million bbl of oil from the fluvial dominated deltaic (FDD) reservoirs in which they are conducted. Wider application of the same techniques, if they are successful, could results in addition of 6.3 billion bbl of reserves, nearly 25% of U.S. crude oil reserves. A multidisciplinary team approach is to be used, with as many as 11 operators, service companies, universities, or state agencies participating in each project. All of the projects will culminate in extensive technology transfer activities. Here are descriptions of the projects gleaned from public abstracts provided by the DOE contractors

  2. Keynote presentation: Project Management, Technology and Evolving Work Processes

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    not be used in the workplace when students graduate, but rather on the ”engine” of problem solving and communication strategies which drives projects and affects project success from the stakeholders point of view. Once students understand the engine, they are able to not only use software tools...... management documents looked like, but also how these documents are interconnected and work together to solve a problem. In addition, as they were in communication with a real client, they needed to work iteratively, ch anging their understanding of the problem, which in turn changed their options for solving...... the problem as well as planning and communicating the solution. This dynamic participation in problem solving helped students gain experience beyond recognition and reproduction  Campus Encounters – Bridging Learners Conference “Developing Competences for Next Generation Service Sectors” April 13–14, 2011...

  3. Work-Family Conflict, Perceived Organizational Support and Professional Commitment: A Mediation Mechanism for Chinese Project Professionals.

    Science.gov (United States)

    Zheng, Junwei; Wu, Guangdong

    2018-02-15

    Projects are characterized by long working hours, complex tasks and being a kind of temporary organization. As such, work-family conflict is particularly prominent for project employees. This research examined whether and how work-family conflict affects professional commitment among Chinese project professionals. Research hypotheses were developed to explore the relationship between work-family conflict, professional commitment to the project and the mediating effects of perceived organizational support. Data were collected from 327 project managers or professionals working in construction enterprises in China; data were analyzed using structural equation modeling, applying the bootstrapping method. Results showed that there were three dimensions of work-family conflict: time-based conflict, strain-based conflict and behavior-based conflict. There were two dimensions of perceived organizational support: emotional support and instrumental support. The study also tested the negative effect of work-family conflict on professional commitment and the positive effect of perceived organizational support on professional commitment. Specifically, time-based conflict and emotional support had positive effects on professional commitment. Perceived organizational support had a total mediating effect between work-family conflict and professional commitment. The strain-based conflict dimension of work-family conflict had negative impacts on professional commitment through perceived emotional support and instrumental support. Overall, our findings extend a better understanding of work-family conflict and professional commitment in the project setting and verify the importance of social support in balancing work and family and improving employee mobility.

  4. Work-Family Conflict, Perceived Organizational Support and Professional Commitment: A Mediation Mechanism for Chinese Project Professionals

    Science.gov (United States)

    2018-01-01

    Projects are characterized by long working hours, complex tasks and being a kind of temporary organization. As such, work-family conflict is particularly prominent for project employees. This research examined whether and how work-family conflict affects professional commitment among Chinese project professionals. Research hypotheses were developed to explore the relationship between work-family conflict, professional commitment to the project and the mediating effects of perceived organizational support. Data were collected from 327 project managers or professionals working in construction enterprises in China; data were analyzed using structural equation modeling, applying the bootstrapping method. Results showed that there were three dimensions of work-family conflict: time-based conflict, strain-based conflict and behavior-based conflict. There were two dimensions of perceived organizational support: emotional support and instrumental support. The study also tested the negative effect of work-family conflict on professional commitment and the positive effect of perceived organizational support on professional commitment. Specifically, time-based conflict and emotional support had positive effects on professional commitment. Perceived organizational support had a total mediating effect between work-family conflict and professional commitment. The strain-based conflict dimension of work-family conflict had negative impacts on professional commitment through perceived emotional support and instrumental support. Overall, our findings extend a better understanding of work-family conflict and professional commitment in the project setting and verify the importance of social support in balancing work and family and improving employee mobility. PMID:29462860

  5. Work-Family Conflict, Perceived Organizational Support and Professional Commitment: A Mediation Mechanism for Chinese Project Professionals

    Directory of Open Access Journals (Sweden)

    Junwei Zheng

    2018-02-01

    Full Text Available Projects are characterized by long working hours, complex tasks and being a kind of temporary organization. As such, work-family conflict is particularly prominent for project employees. This research examined whether and how work-family conflict affects professional commitment among Chinese project professionals. Research hypotheses were developed to explore the relationship between work-family conflict, professional commitment to the project and the mediating effects of perceived organizational support. Data were collected from 327 project managers or professionals working in construction enterprises in China; data were analyzed using structural equation modeling, applying the bootstrapping method. Results showed that there were three dimensions of work-family conflict: time-based conflict, strain-based conflict and behavior-based conflict. There were two dimensions of perceived organizational support: emotional support and instrumental support. The study also tested the negative effect of work-family conflict on professional commitment and the positive effect of perceived organizational support on professional commitment. Specifically, time-based conflict and emotional support had positive effects on professional commitment. Perceived organizational support had a total mediating effect between work-family conflict and professional commitment. The strain-based conflict dimension of work-family conflict had negative impacts on professional commitment through perceived emotional support and instrumental support. Overall, our findings extend a better understanding of work-family conflict and professional commitment in the project setting and verify the importance of social support in balancing work and family and improving employee mobility.

  6. Stress analysis of HLW containers advanced test work Compas project

    International Nuclear Information System (INIS)

    Ove Arup and Partners

    1990-01-01

    The Compas project is concerned with the structural performance of metal overpacks which may be used to encapsulate vitrified high-level waste forms before disposal in deep geological repositories. This document describes the activities performed between June and August 1989 forming the advanced test work phase of this project. This is the culmination of two years' analysis and test work to demonstrate whether the analytical ability exists to model containers subjected to realistic loads. Three mild steel containers were designed and manufactured to be one-third scale models of a realistic HLW container, modified to represent the effect of anisotropic loading and to facilitate testing. The containers were tested under a uniform external pressure and all failed by buckling in the mid-body region. The outer surface of each container was comprehensively strain-gauged to provide strain history data at all positions of interest. In parallel with the test work, Compas project partners, from five different European countries, independently modelled the behaviour of each of the containers using their computer codes to predict the failure pressure and produce strain history data at a number of specified locations. The first axisymmetric container was well modelled but predictions for the remaining two non-axisymmetric containers were much more varied, with differences of up to 50% occurring between failure predictions and test data

  7. Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects

    Science.gov (United States)

    Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad

    2017-12-01

    One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.

  8. The rationale for selecting the method of calculation of project products coast (works, services

    Directory of Open Access Journals (Sweden)

    O. V. Molchanova

    2017-01-01

    Full Text Available In modern conditions of management it is necessary to develop a number of recommendations on the introduction of management accounting at state-owned enterprises that carry out revenue-generating activities or based on the right of economic management. It is necessary to apply the correct cost-accounting method for the production of products, works, services for a more rational calculation of the cost price. This will allow management personnel to receive timely objective information about their cost price, identify the feasibility of production and sales, justify the assortment, plan profits. The procedure for determining the cost price of the project products (works, services in the theory and practice of the state enterprise of the Astrakhan region “Kasprybproekt” is investigated in the work. With the existing practice of planning in design organizations, the planned cost price of design and survey works for established cost items is planned in the cost estimate for production by the design organization as a whole and by the types of work: design, survey and others, without subdividing it by orders (projects. According to this, accounting of the actual costs for work in the design organizations is based. The study showed that the state enterprise of the Astrakhan region “Kasprybproyekt” performs different projects with different execution periods; therefore, it is advisable to use one method of calculating the cost price - job (order costing method, and link it to the responsibility centers depending on the department of the performer. Based on the research of the used method to the cost price calculate of the project products (works, services in the state enterprise of the Astrakhan region “Kasprybproekt”, it was proposed to use the job (order costing method that allows to detail all the project costs without distorting the final financial result and optimize the project costs. If the calculation method is correctly determined

  9. How is the artist role affected when artists are participating in projects in work life?

    Science.gov (United States)

    Stenberg, Henrik

    2016-01-01

    In Sweden, during the last decade, the artist has come to function as a creative resource in workplaces. There are two organisations, Skiss (Contemporary Artist in the Contemporary Society) and Airis (Artist in Residence), that organise projects for artists and coworkers. These projects are intended to have a positive effect on the well-being of organisations and their employees through artistic means, and the artist often focuses on the social interaction between the employees in their work. The artists' work involves frequent interaction with coworkers. The aim of this article was to describe how visual artists' roles as artists are affected by their engagement in artistic and social projects at workplaces in Sweden. The focus in the article is on the social interaction between artists and employees. The study is a qualitative narrative interview study with fine artists participating in different projects in work life. Since the artist's intervention is usually directed towards social relations in the workplaces, a social perspective on well-being is from a micro-sociological point of view. The categories in the interviews were how the artists worked with the projects, how the social interaction between artists and coworkers worked out, and how the artists evaluated the projects in relation to their ambitions. The results show that, many times, the artistic projects promote well-being in organisations and to some extent benefit the artist, but that the ability of the artists to actually function as artists can be problematic.

  10. Developing Mathematical Literacy through project work: A teacher/teaching perspective

    Directory of Open Access Journals (Sweden)

    Renuka Vithal

    2006-10-01

    Full Text Available The implementation of the new Mathematical Literacy curriculum in South Africa is assuming several different conceptions of mathematics and therefore also being realised through a range of different pedagogies. In this paper I begin from a particular privileging of a critical perspective in mathematics education, which I argue is one (among others of the forces shaping the new South African curriculum reforms, particularly the Mathematical Literacy curriculum. If so, then the case for a specific pedagogy, that of project work, can be shown to support the development of a mathematical literacy from a critical perspective. In this paper a particular set of conceptual tools, principles and practices associated with project work, as developed in the Scandanavian context but researched in South Africa, are elaborated from the perspective of teachers/teaching of mathematical literacy.

  11. RFP to work on formation flying capabilities for spacecrafts for the GRACE project

    DEFF Research Database (Denmark)

    Riis, Troels; Thuesen, Gøsta; Kilsgaard, Søren

    1999-01-01

    The National Aeronautics and Space Agency of USA, NASA, are working on formation flying capabilities for spacecrafts, GRACE Project. IAU and JPL are developing the inter spacecraft attitude link to be used on the two spacecrafts.......The National Aeronautics and Space Agency of USA, NASA, are working on formation flying capabilities for spacecrafts, GRACE Project. IAU and JPL are developing the inter spacecraft attitude link to be used on the two spacecrafts....

  12. Factors of human capital related to project success in health care work units.

    Science.gov (United States)

    Suhonen, Marjo; Paasivaara, Leena

    2011-03-01

    To explore factors of human capital related to project success that employees expect from nurse managers. Human capital refers to those resources that managers working with projects possess, such as abilities, knowledge and qualities of character. The data were collected by open interviews (n=14) with nurses, public health nurses and nurse managers working in primary health care and a hospital. Data analysis was carried out using qualitative content analysis. The main factors of human capital related to project success proved to be as follows: (1) management of enthusiastic project culture, (2) management of regeneration and (3) management of emotional intelligence. Future research is needed on the kind of means nurse managers use in human capital management in projects and how they see their possibilities in managing human capital. Human capital management skills should be underlined as an important competence area when recruiting a nurse manager. The success of health care projects cannot be improved only through education or by training of nurse managers; in addition, projects need nurse managers who understand workplace spirituality and have high emotional intelligence. © 2011 The Authors. Journal compilation © 2011 Blackwell Publishing Ltd.

  13. Deep Help in Complex Project Work: Guiding and Path-Clearing Across Difficult Terrain

    OpenAIRE

    Fisher, Colin M.; Pillemer, Julianna; Amabile, Teresa M.

    2017-01-01

    How do teams working on complex projects get the help they need? Our qualitative investigation of the help provided to project teams at a prominent design firm revealed two distinct helping processes, both characterized by deep, sustained engagement that far exceeds the brief interactions described in the helping literature. Such deep help consisted of (1) guiding a team through a difficult juncture by working with its members in several prolonged, tightly clustered sessions, or (2) path-clea...

  14. Innovation in POPBL teaching and learning methods by embedding individual activities as an integrated part of project work

    DEFF Research Database (Denmark)

    Moesby, Egon; W., Hans Henrik; Kørnøv, Lone

    2005-01-01

    activity embedded as an integrated part of the project work. Students work in the solution phase of the project on an individual activity that is separately assessed. The results of these individual activities form the platform for students’ final work with the project as a team. They have to evaluate......In this paper, the authors describe a way to increase student learning through social constructed teamwork by adding an individual activity to the project work. This can be achieved not just by adding an individual activity outside or parallel to the project work, but by having the individual...... the individual solutions and find the one solution to work on in the final phases of the project. On top of that, it helps train students’ abilities to make evaluations among various solutions of which one is their own, thereby learning how to evaluate their personal solutions against another person’s solutions...

  15. Web Environments for Group-Based Project Work in Higher Education

    NARCIS (Netherlands)

    Andernach, J.A.; van Diepen, N.M.; Collis, Betty; Andernach, Toine

    1997-01-01

    We discuss problems confronting the use of group-based project work as an instructional strategy in higher education and describe two courses in which course-specific World Wide Web (Web) environments have evolved over a series of course sequences and are used both as tool environments for

  16. Replacement of the Project Manager Reflected Through Activity Theory and Work-System Theory

    Science.gov (United States)

    Vartiainen, Tero; Aramo-Immonen, Heli; Jussila, Jari; Pirhonen, Maritta; Liikamaa, Kirsi

    Replacement of the project manager (RPM) is a known phenomenon in information systems (IS) projects, but scant attention is given to it in the project management or IS literature. Given its critical effects on the project business, the organization, the project team, and the project manager, it should be studied in more depth. We identified factors which make RPM occurrences inherently different and we show that work-system theory and activity theory give comprehensive lenses to advance research on RPM. For the future research on RPM we identified three objectives: experiences on RPM, process model for RPM, and organizational culture's influence on RPM occurrences.

  17. Project Work Management Addressing the Needs of BVI Learners of EFL

    Directory of Open Access Journals (Sweden)

    Tatiana S. Makarova

    2017-12-01

    Full Text Available Introduction: it is known that inclusive education that opens access to education and facilitates students with special educational needs to socialize successfully is concentrated in special schools whilst mainstream teachers generally lack the methodology of teaching disabled students inclusively. The aim of the article is searching the best ways of educating students with special needs and providing specific conditions of the educational process in mainstream schools. Materials and Methods: the research is based on the results of fulfillment of a number of projects that deal with teaching and educating blind and visually impaired learners and in which all the authors of the article were involved. The problematic approach, the logical method and observation were applied to the research; analysis, comparison, generalization being the most important components of the study. The quantitative data were collected, analyzed and resumed as well. Results: the impact of project work implementation on academic and social skills development of blind and visually impaired students is shown and various types of projects that can be made by visually impaired learners are presented. The authors give their comments when analyzing different ways of adapting research activities to the needs of BVI learners. When speaking in detail on the role of web tools as maximizers of students’ potential the authors refer to their own experience in implementing web tools in project work with blind and visually impaired learners. Discussion and Conclusions: university teacher-training programs should be revised and improved by offering additional courses aimed at educating impaired students through doing research or project work. Special attention should be paid to developing the instructors’ project management skills in terms of teaching English as a foreign language to learners with special needs. It should be noted that different methods and various technological tools

  18. Distribution automation and control support; Analysis and interpretation of DAC working group results for use in project planning

    Science.gov (United States)

    Klock, P.; Evans, D.

    1979-01-01

    The Executive Summary and Proceedings of the Working Group Meeting was analyzed to identify specific projects appropriate for Distribution Automation and Control DAC RD&D. Specific projects that should be undertaken in the DAC RD&D program were recommended. The projects are presented under broad categories of work selected based on ESC's interpretation of the results of the Working Group Meeting. Some of the projects are noted as utility industry projects. The ESC recommendations regarding program management are presented. Utility versus Government management responsibilities are noted.

  19. Life project of adolescents, a product of socio-educational work of school

    Directory of Open Access Journals (Sweden)

    Maibel Rebollar-Ferrer

    2016-10-01

    Full Text Available The improvement of formative work, through a life orientation that is characterized by the correspondence of aspirations or individual goals, potentials and social demands is a challenge to Junior high school in the design and implementation of sócio–educative system of actions, that led by principals and teachers, integrates socializing agents, in order to prepare adolescents in managing a developmental life project to ensure their integration into dynamic and complex society. This research paper nowadays, from the pedagogical, psychological and sociological references, a conceptual basis for understanding adolescents’ life project as an expression of integral formation and the product of social and educational work of school.

  20. Service user integration into social work education: lessons learned from nordic participatory action projects.

    Science.gov (United States)

    Angelin, Anna

    2015-01-01

    Service users have lacked substantial influence, access, and participation in social work education in Norway and Sweden. In this article the author presents comparative analyses of two participatory projects that have developed and implemented practices that integrate service users into academic social work education and empower service users. The Norwegian HUSK project and the Social Work as Mobilization and Entrepreneurship course, also known as the "Mobilization course," at Lund University in Sweden demonstrate collaboration between research, social work education, and service users. The conclusions focus on the importance of the empowering processes by including recognition and dialogue, co-learning in practice, and the use of neutral venues to ensure effective user participation. The inclusion of service users in social work education can improve both practice and education.

  1. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S&M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of IFDP facilities was initiated in FY 1994 and will be completed in FY 1999. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $36M. The costs are summarized. Upon completion of deactivation, annual S&M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

  2. Dust as a Working Fluid for Heat Transfer Project

    Science.gov (United States)

    Mantovani, James G.

    2015-01-01

    The project known as "Dust as a Working Fluid" demonstrates the feasibility of a dust-based system for transferring heat radiatively into space for those space applications requiring higher efficiency, lower mass, and the need to operate in extreme vacuum and thermal environments - including operating in low or zero gravity conditions in which the dust can be conveyed much more easily than on Earth.

  3. Review and Update Project Design, Work Plan and Activities for 2009 and Beyond

    International Nuclear Information System (INIS)

    Edward, M.

    2009-01-01

    A multi year ongoing project, previously approved by Board of Governors (BOG) that is implemented according to the already approved objectives/outcomes and time frame. All projects have time frame in line with the stated objectives and work plans, of maximum of five years. If rephasing is necessary due to dealys in implementation, the project duration can be extended by up to one year, maintaining the original objectives/outcomes

  4. Senate works: law project on the energy policy (first reading)

    International Nuclear Information System (INIS)

    2004-01-01

    This synthesis of the Senate works on the law project on the energy policy, comments each article of the law text. It concerns: the energy demand control, the renewable energies, the equilibrium and the quality of the transport and distribution networks of electric power, taxation and financial incentives. (A.L.B.)

  5. Time, Place and Identity in Project Work on the Net

    DEFF Research Database (Denmark)

    Heilesen, Simon; Jensen, Sisse Siggaard

    2005-01-01

    This chapter identifies some of the fundamental conditions and factors that affect collaborative project work on the Net. Understanding them is fundamental to developing key qualities in Net-based collaborative learning such as confidence, reliability, and trust. We argue that: (1) Collaboration...... of Computer-Mediated Communication program at Roskilde University, Denmark....

  6. Accidents of Electrical and Mechanical Works for Public Sector Projects in Hong Kong.

    Science.gov (United States)

    Wong, Francis K W; Chan, Albert P C; Wong, Andy K D; Hon, Carol K H; Choi, Tracy N Y

    2018-03-10

    A study on electrical and mechanical (E&M) works-related accidents for public sector projects provided the opportunity to gain a better understanding of the causes of accidents by analyzing the circumstances of all E&M works accidents. The research aims to examine accidents of E&M works which happened in public sector projects. A total of 421 E&M works-related accidents in the "Public Works Programme Construction Site Safety and Environmental Statistics" (PCSES) system were extracted for analysis. Two-step cluster analysis was conducted to classify the E&M accidents into different groups. The results identified three E&M accidents groups: (1) electricians with over 15 years of experience were prone to 'fall of person from height'; (2) electricians with zero to five years of experience were prone to 'slip, trip or fall on same level'; (3) air-conditioning workers with zero to five years of experience were prone to multiple types of accidents. Practical measures were recommended for each specific cluster group to avoid recurrence of similar accidents. The accident analysis would be vital for industry practitioners to enhance the safety performance of public sector projects. This study contributes to filling the knowledge gap of how and why E&M accidents occur and promulgating preventive measures for E&M accidents which have been under researched.

  7. Accidents of Electrical and Mechanical Works for Public Sector Projects in Hong Kong

    Directory of Open Access Journals (Sweden)

    Francis K. W. Wong

    2018-03-01

    Full Text Available A study on electrical and mechanical (E&M works-related accidents for public sector projects provided the opportunity to gain a better understanding of the causes of accidents by analyzing the circumstances of all E&M works accidents. The research aims to examine accidents of E&M works which happened in public sector projects. A total of 421 E&M works-related accidents in the “Public Works Programme Construction Site Safety and Environmental Statistics” (PCSES system were extracted for analysis. Two-step cluster analysis was conducted to classify the E&M accidents into different groups. The results identified three E&M accidents groups: (1 electricians with over 15 years of experience were prone to ‘fall of person from height’; (2 electricians with zero to five years of experience were prone to ‘slip, trip or fall on same level’; (3 air-conditioning workers with zero to five years of experience were prone to multiple types of accidents. Practical measures were recommended for each specific cluster group to avoid recurrence of similar accidents. The accident analysis would be vital for industry practitioners to enhance the safety performance of public sector projects. This study contributes to filling the knowledge gap of how and why E&M accidents occur and promulgating preventive measures for E&M accidents which have been under researched.

  8. Accidents of Electrical and Mechanical Works for Public Sector Projects in Hong Kong

    Science.gov (United States)

    Wong, Francis K. W.; Chan, Albert P. C.; Wong, Andy K. D.; Choi, Tracy N. Y.

    2018-01-01

    A study on electrical and mechanical (E&M) works-related accidents for public sector projects provided the opportunity to gain a better understanding of the causes of accidents by analyzing the circumstances of all E&M works accidents. The research aims to examine accidents of E&M works which happened in public sector projects. A total of 421 E&M works-related accidents in the “Public Works Programme Construction Site Safety and Environmental Statistics” (PCSES) system were extracted for analysis. Two-step cluster analysis was conducted to classify the E&M accidents into different groups. The results identified three E&M accidents groups: (1) electricians with over 15 years of experience were prone to ‘fall of person from height’; (2) electricians with zero to five years of experience were prone to ‘slip, trip or fall on same level’; (3) air-conditioning workers with zero to five years of experience were prone to multiple types of accidents. Practical measures were recommended for each specific cluster group to avoid recurrence of similar accidents. The accident analysis would be vital for industry practitioners to enhance the safety performance of public sector projects. This study contributes to filling the knowledge gap of how and why E&M accidents occur and promulgating preventive measures for E&M accidents which have been under researched. PMID:29534429

  9. Problem based Learning versus Design Thinking in Team based Project work

    DEFF Research Database (Denmark)

    Denise J. Stokholm, Marianne

    2014-01-01

    project based learning issues, which has caused a need to describe and compare the two models; in specific the understandings, approaches and organization of learning in project work. The PBL model viewing the process as 3 separate project stages including; problem analysis, problem solving and project......All educations at Aalborg University has since 1974 been rooted in Problem Based Learning (PBL). In 1999 a new education in Industrial design was set up, introducing Design Based Learning (DBL). Even though the two approaches have a lot in common they also hold different understandings of core...... report, with focus on problem solving through analysis. Design Based Learning viewing the process as series of integrated design spaces including; alignment, research, mission, vision, concept, product and process report, with focus on innovative ideation though integration. There is a need of renewing...

  10. Waste Management Project fiscal year 1998 multi-year work plan, WBS 1.2

    International Nuclear Information System (INIS)

    Jacobsen, P.H.

    1997-01-01

    The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible

  11. Collaborative Writing to Enhance Academic Writing Development through Project Work

    Science.gov (United States)

    Robayo Lun, Alma Milena; Hernandez Ortiz, Luz Stella

    2013-01-01

    Advanced students at university level struggle with many aspects of academic writing in English as a foreign language. The purpose of this article is to report on an investigation aimed at analyzing what collaborative writing through project work tells us about students' academic writing development at the tertiary level. The compositions written…

  12. Effect of project work on secondary school students science process ...

    African Journals Online (AJOL)

    The study investigated the effect of students' project work on secondary school science process skills acquisition in Biology. The study was carried out in Owerri North Local Government Area of Imo State. Three research questions guided the study and three null hypotheses were postulated and tested at 0.05 level of ...

  13. Developing Employment Interview and Interviewing Skills in Small-group Project Work.

    Science.gov (United States)

    Hindle, Paul

    2000-01-01

    Discusses the value of communications skills in geographical education. Describes the use of realistic interviews that were a part of small-group project work. Explains that students wrote job specifications, a curriculum vitae, a cover letter, and conducted interview panels. (CMK)

  14. Learning to make technology work - a study of learning in technology demonstration projects

    DEFF Research Database (Denmark)

    Sutherland Olsen, Dorothy; Andersen, Per Dannemand

    2014-01-01

    Building working demonstrations of new technologies within sustainable energy and transport has become an important activity in the move towards a more energy efficient society. The work involved in building these demonstrations is usually organised in a project with a variety of different partic...

  15. EDITORIAL: Student undergraduate laboratory and project work

    Science.gov (United States)

    Schumacher, Dieter

    2007-05-01

    that new experiments which illustrate both fundamental physics and modern technology can be realized even with a small budget. Traditional labwork courses often provide a catalogue of well known experiments. The students must first learn the theoretical background. They then assemble the setup from specified equipment, collect the data and perform the default data processing. However, there is no way to learn to swim without water. In order to achieve a constructivist access to learning, 'project labs' are needed. In a project labwork course a small group of students works as a team on a mini research project. The students have to specify the question of research, develop a suitable experimental setup, conduct the experiment and find a suitable way to evaluate the data. Finally they must present their results e.g. in the framework of a public poster session. Three contributions refer to this approach, however they focus on different aspects: 'Project laboratory for first-year students' by Gorazd Planinšič, 'RealTime Physics: active learning laboratories' by David Sokoloff et al and 'Labs outside labs: miniprojects at a spring camp for future physics teachers' by Leos Dvorák. Is it possible to prepare the students specifically for project labwork? This question is answered by the contribution 'A new labwork course for physics students: devices, methods and research projects' by Knut Neumann and Manuela Welzel. The two main parts of the labwork course cover first experimental devices (e.g. multimeters, oscilloscopes, different sensors, operational amplifiers, step motors, AD/DA-converters). Then subjects such as data processing, consideration of measurement uncertainties, keeping records or using tools like LABVIEW etc are focused on. Another concrete proposal for a new curriculum is provided by James Sharp et al, in 'Computer based learning in an undergraduate physics laboratory: interfacing and instrument control using MATLAB'. One can well imagine that project labs

  16. Kazakhstan participation in International Experimental Reactor ITER Construction project. Work status and prospects

    International Nuclear Information System (INIS)

    Tazhibayeva, I.L.; Tukhvatullin, Sh.T.; Shestakov, V.P.; Kuznetsov, B.A.

    2002-01-01

    Kazakhstan takes part in ITER project in partnership with Russian Federation since the year of 1994. At present the technical stage of the project is completed and ITER Council should take a decision on the site for international reactor. Four countries such as Canada, Japan, Spain and France have offered their territories for being used as site for launching ITER construction. ITER partners started preparing new international agreement that will cover activities on construction, operation and decommissioning of ITER. It will also include the list of research and experimental work that is conducted in support of ITER project. Kazakhstan has already made an important contribution into technical stage realization of ITER project due to scientific and technical researches conducted by National Nuclear Center, by Institute of Experimental and Theoretical Physics and by JSC 'Ulba Metallurgical plant' ('UMP'). Research activity carried out for the support of ITER project is performed in accordance with the following main trends: Tritium safety (permeability and retentin of hydrogen isotopes during in-pile irradiation in various structural materials, co-deposed layers and protective coatings); Verification of computer codes (LOCA type) loss of coolant accidents modeling in ITER reactor; Investigation of liquid metal blanket of thermonuclear reactor (tritium production in lithium containing eutectics Li17Pb83 and ceramics Li 2 TiO 3 , study of tritium permeability). At present the working group of ITER project participants started introducing proposals for cost distribution and for placing the orders on reactor construction. Further Kazakhstan participation in ITER project may be in manufacturing high-tech parts and assemblies from commercial grades of beryllium. They will be used for armouring the reactor first wall, for its thermal protection and for protection of superconductor's components for magnetic systems that are at JSC U MP'. Scientific and technical support of

  17. A Model to Investigate the Effect of Work Ethic Culture on Dynamics of Rework in Management of Projects

    Directory of Open Access Journals (Sweden)

    Hossein Kiani

    2018-03-01

    Full Text Available The present study aims to investigate the effect of work ethic culture on rework in construction projects through a review of literature, surveys, and interviews with project managers. The main research question is what mechanisms can project manager use to balance the costs of personnel training, financial and language incentives, and implementation costs to finish the project with more profit and less rework. In this regard, modelling and data analysis is done using System Dynamics methodology. The results show that by considering work ethic, rework in the project is reduced from 46 % to 39 %. However, the project has been completed with 10 % lower cost and 26 % lower variance. Integrating the issue of rework with the culture of work ethic in the field of project management by at least one exogenous parameter has been studied, while in this study qualitative parameters have been converted to quantitative parameters using fuzzy inference system. The change in management approach to the issue of work ethics and the formulation of human resource strategies of large projects by human resource managers is one of the applications of this study.

  18. The Pedagogic Project as Provocative of the Collective Work in the School

    Directory of Open Access Journals (Sweden)

    Elaine Sampaio Araujo

    2007-06-01

    Full Text Available The objective of this article is to discuss, starting from the historical-cultural perspective, the sense of a pedagogic project considering its procedural nature, the convergence of the personal and collective dimensions and the educational purpose. The goal is to notice the project as possibility in the field pragmatic and in the theory of the sciences of human formation, linking the human development with the schools and its projects. For that, it tries to demonstrate that pedagogic projects configured as activity don't just legitimate the collective participation as it establish a new theoretical and/or methodological order in the organization of the pedagogic work, provoking a school that learns and grows in the search of forming men and women of the best human quality.

  19. A GUIDE TO RECOMMENDATIONS FOR WORKING WITH VIRTUAL TEAMS ON PROJECTS GUIDED BY PMI

    Directory of Open Access Journals (Sweden)

    Maíra Paschoalino Fernandes Bahia

    2017-12-01

    Full Text Available Due the demand of markets to be more competitive in search of immediate results, reach high quality and low cost, the companies are seeking alternatives to have more quality, minimize the cost and speed up the time in a project. One example is work with a model of teams called virtual teams. In order to identify bottlenecks and difficulties encountered in this team model to minimize the risk of failures in a project, this study applied a survey to professionals of various nationalities with experience working with virtual teams based in projects guided by PMI good practices. At the end of this study was possible to quantify and relate the main problems listed by these professionals, which prevented them from completing the projects on time, cost and quality desired. Thus for each of the points mentioned it was suggested some recommendations for the application of tools and techniques most suitable in this context.

  20. Overview of the ACEX project iodine work

    Energy Technology Data Exchange (ETDEWEB)

    Merilo, M

    1996-12-01

    The ACEX project is an internationally sponsored research program that focuses on several aspects of severe accidents. The areas addressed are iodine behavior in containments, pool scrubbing, molten corium concrete interactions, and ex-vessel core debris coolability. These areas all represent extensions to the previous and current ACE and MACE programs respectively. The ACE-Phase B (iodine) project, and other recent research efforts, have clarified the roles of the important phenomena that influence iodine volatility in reactor containments during severe accidents. The ACE Iodine Chemistry Subcommittee concluded that even though enough data has been generated to support reasonably good quantification of the important phenomena, a few important areas remain where quantification is still uncertain. This is due to a lack of agreement on how to utilize the existing database, as well as the possible absence of critical test and/or property data. Technical resolution of the overall iodine behavior issue is therefore not feasible until these uncertainties are fully assessed and practical solutions have been identified, implemented, and verified. The overall objectives of the ACEX iodine research program are to ensure that the iodine database can be used to predict the airborne concentration of iodine, the conditions for iodine reservoir stability, and to provide a mechanistic understanding for these phenomena. The first phase of this work involves a comprehensive review and interpretation of the existing database in order to formulate practical strategies for dealing with significant uncertainties and/or deficiencies. Several projects are underway involving the effects of organic reactions and structural surface interactions. In addition effort is being expended on standardizing the aqueous iodine kinetics database, specifying useful mass transfer models, and defining methodology for pH prediction. (Abstract Truncated)

  1. Ergonomics work assessment in rural industrial settings: a student occupational therapy project.

    Science.gov (United States)

    Bowman, Peter J

    2012-01-01

    This case study describes a student occupational therapy (OT) program, the creation of a worksite assessment project as a part of a Community Connections: Partners for Learning and Service grant funded by Health Resources and Services Administration. The primary goals were to design occupation-based community learning experiences in a variety of rural community settings, so that students might benefit from participating in the community based learning and: based on the results, embed occupation-based learning into existing occupational therapy curriculum. The components of the project and the ergonomics content of the OT education program are described; details of the work assessment are presented with analysis of data from the student evaluation of this project.

  2. Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach

    NARCIS (Netherlands)

    Miao, Yongwu; Sloep, Peter; Koper, Rob

    2009-01-01

    Miao, Y., Sloep, P. B., & Koper, R. (2009). Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach. Presented at the 'Open workshop of TENCompetence - Rethinking Learning and Employment at a Time of Economic Uncertainty-event'. November, 19, 2009,

  3. Spent nuclear fuel project multi-year work plan WBS number 1.4.1

    International Nuclear Information System (INIS)

    Wells, J.L.

    1997-01-01

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency

  4. Infusing and sustaining aging content in social work education: findings from GeroRich projects.

    Science.gov (United States)

    Hash, Kristina M; Gottlieb, Jody; Harper-Dorton, Karen V; Crawley-Woods, Geraldine; Shelek-Furbee, Katherine; Smith, John David; Brown, Rita

    2007-01-01

    This article presents findings from experiences of 67 projects involved in GeroRich, an initiative funded by the John A. Hartford Foundation designed to infuse, enrich and sustain aging content in BSW and MSW curricula. Thematic qualitative analysis was used to uncover themes in answers to open-ended questions contained in End-of-Year 2 project reports. Content areas addressed by open-ended answers were: (1) successes and innovations, and (2) challenges requiring responses. Primary successes and innovations identified were as follows: curriculum enrichment, faculty and student involvement, student-learning activities and community. Challenges to be responded to were identified as lack of faculty involvement, competing demands on faculty and programs, and sustainability of project efforts. Examples of strategies implemented to overcome these obstacles include providing teaching resources, instituting financial and other supports, and developing strategic plans for sustaining content infusion post-funding. Experiences of the GeroRich projects offer practical considerations for other social work programs that accept the challenge of attracting and preparing students to work with the increasing population of older adults.

  5. Underestimating Costs in Public Works Projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    2002-01-01

    This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... honest numbers should not trust the cost estimates and cost-benefit analyses produced by project promoters and their analysts. Independent estimates and analyses are needed as are institutional checks and balances to curb deception.......This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... estimates used to decide whether important infrastructure should be built are highly and systematically misleading. The result is continuous cost escalation of billions of dollars. The sample used in the study is the largest of its kind, allowing for the first time statistically valid conclusions regarding...

  6. Cost Underestimation in Public Works Projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... honest numbers should not trust the cost estimates and cost-benefit analyses produced by project promoters and their analysts. Independent estimates and analyses are needed as are institutional checks and balances to curb deception.......This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... estimates used to decide whether important infrastructure should be built are highly and systematically misleading. The result is continuous cost escalation of billions of dollars. The sample used in the study is the largest of its kind, allowing for the first time statistically valid conclusions regarding...

  7. What a Joint. Youth Training Scheme. Core Exemplar Work Based Project.

    Science.gov (United States)

    Further Education Staff Coll., Blagdon (England).

    This trainer's guide is intended to assist supervisors of work-based career training projects in helping students become familiar with meat processing--livestock at the stockyards, meat packers (wholesalers), and butcher shops--to the cooked state and to become familiar with the different joints (cuts or parts) of beef, lamb, and pork. The guide…

  8. Automated Irrigation System for Greenhouse Monitoring

    Science.gov (United States)

    Sivagami, A.; Hareeshvare, U.; Maheshwar, S.; Venkatachalapathy, V. S. K.

    2018-06-01

    The continuous requirement for the food needs the rapid improvement in food production technology. The economy of food production is mainly dependent on agriculture and the weather conditions, which are isotropic and thus we are not able to utilize the whole agricultural resources. The main reason is the deficiency of rainfall and paucity in land reservoir water. The continuous withdrawal water from the ground reduces the water level resulting in most of the land to come under the arid. In the field of cultivation, use of appropriate method of irrigation plays a vital role. Drip irrigation is a renowned methodology which is very economical and proficient. When the conventional drip irrigation system is followed, the farmer has to tag along the irrigation timetable, which is different for diverse crops. The current work makes the drip irrigation system an automated one, thereby the farmer doesn't want to follow any timetable since the sensor senses the soil moisture content and based on it supplies the water. Moreover the practice of economical sensors and the simple circuitry makes this project as an inexpensive product, which can be bought even by an underprivileged farmer. The current project is best suited for places where water is limited and has to be used in limited quantity.

  9. Automated Irrigation System for Greenhouse Monitoring

    Science.gov (United States)

    Sivagami, A.; Hareeshvare, U.; Maheshwar, S.; Venkatachalapathy, V. S. K.

    2018-03-01

    The continuous requirement for the food needs the rapid improvement in food production technology. The economy of food production is mainly dependent on agriculture and the weather conditions, which are isotropic and thus we are not able to utilize the whole agricultural resources. The main reason is the deficiency of rainfall and paucity in land reservoir water. The continuous withdrawal water from the ground reduces the water level resulting in most of the land to come under the arid. In the field of cultivation, use of appropriate method of irrigation plays a vital role. Drip irrigation is a renowned methodology which is very economical and proficient. When the conventional drip irrigation system is followed, the farmer has to tag along the irrigation timetable, which is different for diverse crops. The current work makes the drip irrigation system an automated one, thereby the farmer doesn't want to follow any timetable since the sensor senses the soil moisture content and based on it supplies the water. Moreover the practice of economical sensors and the simple circuitry makes this project as an inexpensive product, which can be bought even by an underprivileged farmer. The current project is best suited for places where water is limited and has to be used in limited quantity.

  10. Win-Win-Win: Reflections from a Work-Integrated Learning Project in a Non-Profit Organization

    Directory of Open Access Journals (Sweden)

    Dale C MacKrell

    2016-05-01

    Full Text Available This paper reports on the educational aspects of an information systems work-integrated learning (WIL capstone project for an organization which operates to alleviate homelessness in the Australian non-profit sector. The methodology adopted for the study is Action Design Research (ADR which draws on action research and design research as a means for framing a project's progress. Reflective insights by the project stakeholders, namely, students, academics, and the non-profit client, reveal a curriculum at work through internal features of the organization; personal features of the participants and features of the external environment. Preliminary findings suggest that students in a WIL project for a non-profit are highly engaged, especially when they become aware of the project’s social value. As well, the improvement of professional skills and emotional intelligence by students is more likely in real-life practice settings than in other less authentic WIL activities, equipping graduates for the workforce with both strong disciplinary and generic skills. Win-win-win synergies through project collaboration represent worthwhile outcomes to education, industry and research.

  11. Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach

    NARCIS (Netherlands)

    Miao, Yongwu; Sloep, Peter; Koper, Rob

    2009-01-01

    Miao, Y., Sloep, P. B., & Koper, R. (2010). Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach. In D. Griffiths & R. Koper (Eds.), Rethinking Learning and Employment at a Time of Economic Uncertainty. Proceedings of the 6th TENCompetence Open

  12. Chernobyl Studies Project. Working Group 7.0, environmental transport and health effects

    International Nuclear Information System (INIS)

    Hendrickson, S.M.

    1994-01-01

    The focus of the Chernobyl Studies Project has now turned to the issue of health effects from the Chernobyl accident. Currently, we are involved in and making progress on the case-control and co-hort studies of thyroid diseases among Belarussian children. Dosimetric aspects are a fundamental part of these studies. We are working to implement similar studies in Ukraine. A major part of the effort of these projects is supporting these studies, both by providing methods and applications of dose reconstruction and by providing support and equipment for the medical teams

  13. Participatory ergonomics in industrial engineering projects: The case of a new cheese packaging line work system

    DEFF Research Database (Denmark)

    Souza da Conceição, Carolina; Broberg, Ole; Aldrich, Per

    2014-01-01

    The aim of this study is to explore and conceptualize the challenges that ergonomists meet when seeking to introduce PE methods into an industrial engineering design project in order to optimize the new work system.......The aim of this study is to explore and conceptualize the challenges that ergonomists meet when seeking to introduce PE methods into an industrial engineering design project in order to optimize the new work system....

  14. Does assessing project work enhance the validity of qualifications? The case of GCSE coursework

    Directory of Open Access Journals (Sweden)

    Victoria Crisp

    2009-03-01

    Full Text Available This paper begins by describing current views on validity and how certain assessment forms, such as school-based project work, may enhance validity. It then touches on debates about the dependability of assessment by teachers. GCSEs and GCSE coursework are then described along with the reasons for the inclusion of coursework in many GCSEs. Crooks, Kane and Cohen’s (1996 chain model of eight linked stages of validity enquiry is then used as a structure within which to consider the validity of project work assessments, and specifically GCSE coursework assessment, drawing on the available literature. Strengths for validity include the ability to assess objectives that are difficult to test in written examinations, promoting additional skills such as critical thinking, creativity and independent thinking, and improving motivation. Possible threats to validity include the potential for internet and other types of plagiarism, tasks becoming overly structured and formulaic thus reducing the positive impact on learning, and the potentially heavy workload for teachers and students. The paper concludes by describing current policy changes in the UK with regard to GCSE coursework and relates this to strong and weak validity links for project work as a mode of assessment.

  15. The projects of skunk works 75 years of Lockheed Martin's advanced development programs

    CERN Document Server

    Pace, Steve

    2016-01-01

    The Projects of Skunk Works examines 75 years of Lockheed Martin's advanced development programs, from jet fighters to missiles, heavy-lift helicopters, a lighter-than-air ship, drones, and a stealth boat.

  16. Using historical crash data as part of traffic work zone safety planning and project management strategies.

    Science.gov (United States)

    2014-07-01

    This funding enabled the project entitled, USING HISTORICAL CRASH DATA AS PART OF TRAFFIC WORK ZONE SAFETY : PLANNING AND PROJECT MANAGEMENT STRATEGIES to address the following: : Evaluate current organizational strategies with respect to w...

  17. Learning network theory : its contribution to our understanding of work-based learning projects and learning climate

    OpenAIRE

    Poell, R.F.; Moorsel, M.A.A.H. van

    1996-01-01

    This paper discusses the relevance of Van der Krogt's learning network theory (1995) for our understanding of the concepts of work-related learning projects and learning climate in organisations. The main assumptions of the learning network theory are presented and transferred to the level of learning groups in organisations. Four theoretical types of learning projects are distinguished. Four different approaches to the learning climate of work groups are compared to the approach offered by t...

  18. Projects for increasing job satisfaction and creating a healthy work environment.

    Science.gov (United States)

    Brunges, Michele; Foley-Brinza, Christine

    2014-12-01

    Workplace culture is one of the biggest factors driving employee commitment and engagement. Multiple studies have shown that hospitals will perform better over time if employees are committed to their jobs and engaged in what they do. By creating and implementing multiple projects during a three-year period, a team at the University of Florida Health Shands Hospital, Gainesville, increased job satisfaction. Projects included ensuring meal breaks were offered, creating a serenity area, developing the patient ambassador role, actively addressing bullying and unprofessional behavior, assigning a student mentee to work with staff members on culture change, offering regular fun activities, redesigning the unit, reorganizing schedules to reduce stress, implementing education and training initiatives, establishing a Unit Practice Council, and implementing reward and recognition programs. Survey results and anecdotal evidence suggest that these projects combined to increase employee satisfaction and employee retention rates. Copyright © 2014 AORN, Inc. Published by Elsevier Inc. All rights reserved.

  19. Room Allocation Optimisation at the Technical University of Denmark

    DEFF Research Database (Denmark)

    Bagger, Niels-Christian Fink; Larsen, Jesper; Stidsen, Thomas Riis

    2014-01-01

    As at many other universities the Technical University of Denmark (DTU) faces the challenge of solving a case of the curriculum based university course timetabling problem (CUCTT) multiple times a year. However, there are some slight modications to the CUCTT problem usually described in the liter...... at overlapping time slots, since the students are to ensure by themselves that their courses do not overlap. The problem was rst considered in the masters' thesis [1] and the project here is an extension of the work done in that thesis....

  20. Fusion looks to the future - again

    International Nuclear Information System (INIS)

    Waldrop, M.M.

    1984-01-01

    The $46 million budget cut in the US magnetic fusion program introduced a new approach that abandons the race to build a working power reactor in favor of a long-term emphasis on science, technology, and international cooperation. Administration policies which favor private funding for demonstration projects and general concern over the deficit have changed the overall fusion policy, although there is some concern among research groups that the program will become unfocused without its detailed timetable. If this happens, they see the program becoming even more vulnerable to future budget cuts. 2 references

  1. Evaluation of the Work-Place Cooperative Project in Geography Degrees at the University of Leeds.

    Science.gov (United States)

    Hogg, James

    1998-01-01

    Describes the context and objective of a Work-Place Cooperative Project (WPCP) established in the School of Geography at the University of Leeds in 1995. The project presents students with business, commerce, industry, and environmental research issues that have geographical dimensions. Includes a number of examples from the WPCP. (MJP)

  2. Conceptual design statement of work for the immobilized low-activity waste disposal facility, project W-520

    International Nuclear Information System (INIS)

    Pickett, W.W.

    1998-01-01

    This Statement of Work outlines the deliverables and schedule for preparation of the Project W-520 Conceptual Design Report, including, work plans, site development plan, preliminary safety evaluation, and conceptual design

  3. How Undergraduate Students Use Social Media Technologies to Support Group Project Work

    Science.gov (United States)

    McAliney, Peter J.

    2013-01-01

    Technology continues to evolve and become accessible to students in higher education. Concurrently, teamwork has become an important skill in academia and the workplace and students have adopted established technologies to support their learning in both individual and team project work. Given the emergence of social media technologies, I examined…

  4. Spent nuclear fuel project multi-year work plan WBS {number_sign}1.4.1

    Energy Technology Data Exchange (ETDEWEB)

    Wells, J.L.

    1997-03-01

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency.

  5. Savannah River Plant engineering, design, and construction history of ``S`` projects and other work, January 1961--December 1964. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1970-03-01

    The work described in this volume of ``S`` Projects History is an extension of the type of work described in Volume I. E.I. du Pont de flemours & Company had entered into Contract AT (07-2)-l with the United States Atomic Energy Commission to develop, design, construct, install, and operate facilities to produce heavy water, fissionable materials, and related products. Under this contract,, Du Pont constructed and operated the Savannah River Plant. The engineering, design, and construction for most of the larger ``S`` projects was performed by the Engineering DeDartment. For some of the large and many of the smaller projects the Engineering Department was responsible only for the construction because the Atomic Energy Division (AED) of the Explosives Department handled the other phases. The Engineering Department Costruction Division also performed the physical work for many of the plant work orders. This volume includes a general description of the Du Pont Engineering Department activities pertaining to the engineering, design, and construction of the ``S`` projects at the Savannah River Plant; brief summaries of the projects and principal work requests; and supplementary informaticn on a few subjects in Volume I for which final data was not available at the closing date. Projects and other plant engineering work which were handled entirely by the Explosives Department -- AED are not included in this history.

  6. Championing mental health at work: emerging practice from innovative projects in the UK.

    Science.gov (United States)

    Robinson, Mark; Tilford, Sylvia; Branney, Peter; Kinsella, Karina

    2014-09-01

    This paper examines the value of participatory approaches within interventions aimed at promoting mental health and wellbeing in the workplace. Specifically the paper explores data from the thematic evaluation of the Mental Health and Employment project strand within the Altogether Better programme being implemented in England in the Yorkshire and Humber region, which was funded through the BIG Lottery and aimed to empower people across the region to lead better lives. The evaluation combined a systematic evidence review with semi-structured interviews across mental health and employment projects. Drawing on both evaluation elements, the paper examines the potential of workplace-based 'business champions' to facilitate organizational culture change within enterprises within a deprived regional socio-economic environment. First, the paper identifies key policy drivers for interventions around mental health and employment, summarizes evidence review findings and describes the range of activities within three projects. The role of the 'business champion' emerged as crucial to these interventions and therefore, secondly, the paper examines how champions' potential to make a difference depends on the work settings and their existing roles, skills and motivation. In particular, champions can proactively coordinate project strands, embed the project, encourage participation, raise awareness, encourage changes to work procedures and strengthen networks and partnerships. The paper explores how these processes can facilitate changes in organizational culture. Challenges of implementation are identified, including achieving leverage with senior management, handover of ownership to fellow employees, assessing impact and sustainability. Finally, implications for policy and practice are discussed, and conclusions drawn concerning the roles of champions within different workplace environments. © The Author (2013). Published by Oxford University Press. All rights reserved. For

  7. Addiction and Lifestyles in Contemporary Europe: Reframing Addictions Project (ALICE RAP). Final Evaluation Report Deliverable 21.1, Work Package 21

    OpenAIRE

    Mittelmark, Maurice B.

    2016-01-01

    At the onset of the ALICE RAP project, the following objectives, description of work, and main tasks were agreed for Work Package 21: 1. To evaluate the overall functioning of the collaborative research project, using a state-of-art systems model of partnership functioning. 2. To document the interactions and linkages between project inputs, throughputs and outputs as the project unfolds over five years. 3. To facilitate structured discussions involving all pa...

  8. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-08-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year

  9. The Educational Work and Life Project Professional college student. A necessary relationship in Higher Education

    Directory of Open Access Journals (Sweden)

    Noraida Garbizo Flores Montes de Oca

    2014-06-01

    Full Text Available The new tendencies of the superior Cuban education, require of an educational renewing practice after contributing to the integral formation of the graduate future university, by achieving it harmonize the formation of sk ills and attitudes habits knowledges and the construction of a project of professional life sustained in values. In this sense the academic year constitutes the cell of the educational work to this level. Therefore at present it works try to get evaluate the necessary question between the educational labor and the project of professional life of the university student, with emphasis in the |protagónico| role of the social actors of the educational process.

  10. Reducing Stress within the Rehabilitative Work Setting - A Report on the ROSE Project

    Science.gov (United States)

    Wells, John S. G.; Denny, Margaret

    Reducing Occupational Stress in Employment (ROSE) is an EU funded project which aims to develop a combined person and work directed stress management programme in order to improve the long-term retention of staff in the vocational rehabilitation sector for mental health and intellectual disabilities.

  11. ANDRILL educational activities in Italy: progettosmilla.it, a case-study of an interactive project

    Science.gov (United States)

    Cattadori, M.

    2008-12-01

    In January 2006, the Italian ANDRILL (Antartic Geological Drilling) team selected the project progettosmilla.it and its instructor Matteo Cattadori, a high school teacher and collaborator of Museo Tridentino di Scienze Naturali (TN - Italy) to represent Italy in the ANDRILL-ARISE team. The ARISE (Andrill Research Immersion for Science Educators) comprised a group of teachers from 4 nations (US, New Zealand, Germany and Italy) and is part of the initiative Public and Educational Outreach component of the ANDRILL project. The selected teachers are sent to Antarctica and are actively involved in all stages of the scientific investigation, with the main aim of establishing a bridge between research and the schools in the participating countries. Progettosmilla.it was selected to take part in the first edition of ANDRILL-ARISE held at the American Antarctic base of Mc Murdo during the 2006-2007 austral summer.The project makes use of different tools, techniques and forms of communication-education to stimulate the interest and motivation of students, teachers and organizers/trainers in ANDRILL research and polar sciences in general. Activities are organized and scheduled according to a fixed timetable that cover 2/3 of an academic year and are centered on the site www.progettosmilla.it. This site feature daily reports, as well as online activities and various services for users in Italian schools. Among the online materials, more conventional ones are: - summaries of the ANDRILL research and the Antarctic environment; including multimedia (1200 photos, 10 video and audio); resource folders for teachers on 10 different subjects of study; course work for the participating school students. - ITC-oriented materials such as: videoconferencing and chat sessions with Antarctica or between classes, blogs, web-quest, animations and interactive teaching. -Many services are implemented in collaboration with other teachers and allow the ARISE team to perform distant collaborative

  12. The work and recovery project: changing organizational culture and practice in New York City outpatient services.

    Science.gov (United States)

    Pascaris, Alysia; Shields, Leslie Reed; Wolf, Jessica

    2008-01-01

    Complex and multiple barriers confront out-patient programs in promoting recovery and addressing mental health recipients' work-related goals. This article describes a focused organizational change project utilizing intensive consultation and technical assistance within five New York City outpatient psychiatric services. The project aimed to increase staff exposure to, understanding and use of work-related and recovery-based concepts to promote consumers' recovery and attainment of employment goals. Tailored assessment, curriculum delivery, and identification and implementation of change objectives were useful strategies in promoting change. This change model can serve to assist programs in their efforts to integrate new approaches and to better understand changes among leadership, staff and consumers, and changes in organizational culture and practice required to support a work and recovery-oriented service paradigm. The project experience suggests that adopting and embracing new practices takes time. Varied and incremental steps toward programmatic and operational changes can be significant and can reap authentic sustainable change occurring in the process of learning, experiencing, internalizing and adjusting to new methods of practice.

  13. Interdisciplinary Action in Halls of EJA: the projects work in the light of focus-cultural history

    Directory of Open Access Journals (Sweden)

    Cyntia Graziella Guizelim Simões Girotto

    2009-11-01

    Full Text Available This article aims to discuss the organization of work teaching in classrooms of Pejão (Program of Education for Youth and Adult - Unesp - Linda through the Work Projects, which underlie actions from the perspective of interdisciplinary Theory History-Culture. Pointing to the pedagogical implications of this conception of education, considering the formation of educating young adults and forth the use of time and space for education, production of knowledge, the procedure to information given to school subjects, the development / implementation / development / evaluation of projects of interdisciplinary work in the light of the focus vygotiskiano. Therefore, our gaze is theoretical and methodological back-up for a particular context: the classes of its shares in EJA interdisciplinary. Discuss such issues as follows: the first section, we present the general theory, discussing key concepts such as mediation, activity, learning, development, and then inserted the actions of students and educators of EJA. In a second section, we draw some lessons of that theory, to (re present and (re thinking projects in the EJA, resignified and resizing them by vygotiskiano bias.

  14. Collective Efficacy and Its Relationship with Leadership in a Computer-Mediated Project-Based Group Work

    Science.gov (United States)

    Huh, Yeol; Reigeluth, Charles M.; Lee, Dabae

    2014-01-01

    Based on Bandura's work, the four sources of efficacy shaping were examined in regard to frequency and students' perception of importance in a computer-mediated, project-based high school classroom. In a context of group work where there was no designated leader, groups' collective efficacy was examined if it has any relationship with individual's…

  15. Differentiation vs. common targets and timetables

    International Nuclear Information System (INIS)

    Jefferson, M.

    1997-01-01

    The World Energy Council promotes the sustainable supply and use of energy. Fossil fuels, nuclear and renewable technologies are all represented. The World Energy Council supports the principles of the climate convention and the need for precautionary measures. However, the Council expressed criticism of the IPCC's projection of global surface temperature change to year 2100, especially in the IS92A, E and F scenarios. In a review of the current status of greenhouse gas emission reductions for Annex I countries, the speaker pointed out that of the 15 countries of the European Union (EU15), only Switzerland is doing relatively well in its emissions per capita. His prediction was that overall, success will evade us unless we are willing to settle for realistic targets, export-related emissions credits, some focused joint implementation schemes for developing countries, and generally, adopt a longer term vision to global warming

  16. Knowledge Translation of Interprofessional Collaborative Patient-Centred Practice: The Working Together Project Experience

    Science.gov (United States)

    MacDonald, Colla J.; Archibald, Douglas; Stodel, Emma; Chambers, Larry W.; Hall, Pippa

    2008-01-01

    The Working Together (WT) project involved the design and delivery of an online learning resource for healthcare teams in long-term care (LTC) so that knowledge regarding interprofessional collaborative patient-centred practice (ICPCP) could be readily accessed and then transferred to the workplace. The purpose of this paper is to better…

  17. Indico MEETING tutorial

    CERN Multimedia

    CERN. Geneva; Manzoni, Alex Marc; Dimou, Maria

    2017-01-01

    This short tutorial explains how to create a MEETING in indico, how to populate the timetable, write minutes and how to add material. If you are only interested in the timetable part, please slide to 03.39, for the minutes to 07.46 and for adding material to 08.29.   Tell us what you think via e-learning.support at cern.ch More tutorials in the e-learning collection of the CERN Document Server (CDS) http://cds.cern.ch/collection/E-learning%20modules?ln=en All info about the CERN rapid e-learning project is linked from http://twiki.cern.ch/ELearning  

  18. Site 300 hazardous-waste-assessment project. Interim report: December 1981. Preliminary site reconnaissance and project work plan

    International Nuclear Information System (INIS)

    Raber, E.; Helm, D.; Carpenter, D.; Peifer, D.; Sweeney, J.

    1982-01-01

    This document was prepared to outline the scope and objectives of the Hazardous Waste Assessment Project (HWAP) at Site 300. This project was initiated in October, 1981, to investigate the existing solid waste landfills in an effort to satisfy regulatory guidelines and assess the potential for ground-water contamination. This involves a site-specific investigation (utilizing geology, hydrology, geophysics and geochemistry) with the goal of developing an effective ground-water quality monitoring network. Initial site reconnaissance work has begun and we report the results, to date, of our geologic hydrogeologic studies. All known solid waste disposal locations are underlain by rocks of either the Late Miocene Neroly Formation or the Cierbo Formation, both of which are dominantly sandstones interbedded with shale and claystone. The existence of a regional confined (artesian) aquifer, as well as a regional water-table aquifer is postulated for Site 300. Preliminary analysis has led to an understanding of directions and depths of regional ground-water flow

  19. Project management the agile way making it work in the enterprise

    CERN Document Server

    Goodpasture, John C

    2016-01-01

    Widely acclaimed as one of the top Agile books and a recommended resource for the PMI-ACP Exam in its first edition, Project Management the Agile Way by popular demand has been updated and redesigned. This second edition is in modular format to facilitate training and advanced course instruction, and provides new coverage of Agile, such as hybrid agile methods, the latest public sector practices, and a chapter dedicated to transitioning to agile. It discusses the "grand bargain" between project management and business, the shift in dominance from plans to product, and from input to output, and introduces new concepts such as return on benefit. Experienced practitioners and students that want to learn how to make agile work effectively in the enterprise should read this book. Individuals preparing for the PMI Agile Certified Practitioner (PMI-ACP) examination, and training providers developing courses, will find this second edition quite helpful.

  20. The Impact of Project Work and the Writing Process Method on Writing Production

    Science.gov (United States)

    Díaz Ramírez, Marcela

    2014-01-01

    This article presents the outcomes of an investigation whose main goal was to implement the methodology of project work and a process approach in order to improve writing production in an English class of Colombian university students since their diagnostic tests showed that their written production had the lowest score. Based on data collected,…

  1. The Competence for Project Team Members in the Conditions of Remote Working

    Directory of Open Access Journals (Sweden)

    Zdonek Iwona

    2017-02-01

    Full Text Available The article presents results of the qualitative research on competence of project team members in the conditions of remote working. These competences were considered in relation to different roles, which the members of such a team accept. The reference point to studied roles was the concept of Hansen and Allen authorships, and with regard to competence, the author's synthesis of deliberations above their models described in the literature.

  2. Characteristics of the process of culture development project activities (culture of social engineering) at the future bachelors of social work

    OpenAIRE

    Natalya I. Nikitina; Elena Yu. Romanovaa; Tatyana V. Vasilyeva; Irina N. Nikishina; Veronica M. Grebennikova

    2017-01-01

    In modern Russia professional activity productivity of social work specialist depends largely on his abilities and skills in the field of social design. University graduate`s (social work bachelor`s) high level of professional-project activity culture can be regarded as one of the necessary conditions of successful labour market adaptation of young specialists in social sphere institutions. The article discusses various aspects of future social work bachelors` vocational project activity cult...

  3. Educational Interdisciplinarity in the High School through working with Pedagogical Projects

    Directory of Open Access Journals (Sweden)

    Irinéa de Lourdes Batista

    2008-08-01

    Full Text Available In this research, an understanding about scholar interdisciplinarity and project working is brought, aiming at showing that the last one is an alternative methodological to promote an interdisciplinary educative practice. Therefore a pedagogical proposal was built to implement interdisciplinarity in Science and Mathematics Education in High School. It is exposed the theoretical syntheses, analysis and discussions concerning the pertinence and possibility to implement the proposal studied by the teachers and pedagogical staff in a public High School in the State of Paraná, Brazil.

  4. Looking after Lawns and Bedding. Youth Training Scheme. Core Exemplar Work Based Project.

    Science.gov (United States)

    Further Education Staff Coll., Blagdon (England).

    This trainer's guide is intended to assist supervisors of work-based career training projects in teaching students about lawn care. The guide is one in a series of core curriculum modules that is intended for use in combination on- and off-the-job programs to familiarize youth with the skills, knowledge, and attitudes necessary for success in the…

  5. Fundamental Aeronautics Program: Overview of Project Work in Supersonic Cruise Efficiency

    Science.gov (United States)

    Castner, Raymond

    2011-01-01

    The Supersonics Project, part of NASA?s Fundamental Aeronautics Program, contains a number of technical challenge areas which include sonic boom community response, airport noise, high altitude emissions, cruise efficiency, light weight durable engines/airframes, and integrated multi-discipline system design. This presentation provides an overview of the current (2011) activities in the supersonic cruise efficiency technical challenge, and is focused specifically on propulsion technologies. The intent is to develop and validate high-performance supersonic inlet and nozzle technologies. Additional work is planned for design and analysis tools for highly-integrated low-noise, low-boom applications. If successful, the payoffs include improved technologies and tools for optimized propulsion systems, propulsion technologies for a minimized sonic boom signature, and a balanced approach to meeting efficiency and community noise goals. In this propulsion area, the work is divided into advanced supersonic inlet concepts, advanced supersonic nozzle concepts, low fidelity computational tool development, high fidelity computational tools, and improved sensors and measurement capability. The current work in each area is summarized.

  6. Transfer of innovation, knowledge and competencies on the care service for people with acquired disabilities: the European Project "Care for Work".

    Science.gov (United States)

    Barchitta, M; Fragapane, S; Consoli, M T; Pennisi, C; Agodi, A

    2012-01-01

    The growing needs of people with disabilities require to integrate this issue into public health in order to improve political feasibility and to ensure that disability will not be left off from any strategic table. The main aim of the "Care for Work" project was to provide training contents to help workers and unemployed people to adapt their knowledge, skills and competencies to the care services sector in order to facilitate their insertion in a new employment source. The partners participating in the project are Organizations from 5 European countries. The project has been divided into seven Work Packages (WPs): three transversal WPs and four specific WPs, each addressing specific activities necessary to achieve the final objectives of the project. The "Care for Work" learning environment contains specific information and training on the techniques for caring people with acquired physical disabilities, as text documents and short training films. The project combines e-learning (Web 2.0) and mobile learning providing a flexible training platform for workers of care services sector. The "Care for Work" project offers specific training addressed to meet the new existing needs of workers of the care services sector and/or unemployed people. All the information and results of the project are available on the web page: www.careforwork.eu, and the present article is part of the WP "Valorization".

  7. Chernobyl Studies Project: Working group 7.0, Environmental transport and health effects. Progress report, March--September 1994

    Energy Technology Data Exchange (ETDEWEB)

    Anspaugh, L.R.; Hendrickson, S.M. [eds.

    1994-12-01

    In April 1988, the US and the former-USSR signed a Memorandum of Cooperation (MOC) for Civilian Nuclear Reactor Safety; this MOC was a direct result of the accident at the Chernobyl Nuclear Power Plant Unit 4 and the following efforts by the two countries to implement a joint program to improve the safety of nuclear power plants and to understand the implications of environmental releases. A Joint Coordinating Committee for Civilian Nuclear Reactor Safety (JCCCNRS) was formed to implement the MOC. The JCCCNRS established many working groups; most of these were the responsibility of the Nuclear Regulatory Commission, as far as the US participation was concerned. The lone exception was Working Group 7 on Environmental Transport and Health Effects, for which the US participation was the responsibility of the US Department of Energy (DOE). The purpose of Working Group 7 was succintly stated to be, ``To develop jointly methods to project rapidly the health effects of any future nuclear reactor accident.`` To implement the work DOE then formed two subworking groups: 7.1 to address Environmental Transport and 7.2 to address Health Effects. Thus, the DOE-funded Chernobyl Studies Project began. The majority of the initial tasks for this project are completed or near completion. The focus is now turned to the issue of health effects from the Chernobyl accident. Currently, we are involved in and making progress on the case-control and co-hort studies of thyroid diseases among Belarussian children. Dosimetric aspects are a fundamental part of these studies. We are currently working to implement similar studies in Ukraine. A major part of the effort of these projects is supporting these studies, both by providing methods and applications of dose reconstruction and by providing support and equipment for the medical teams.

  8. The Influence of tolerance on the Learning Processes in Project Group Work

    DEFF Research Database (Denmark)

    Wiberg, Merete

    This paper presents a moral perspective on group work in higher education by addressing tolerance as a moral value of practice which is intertwined with learning of disciplinary knowledge. The relevance of tolerance among students is discussed in relation to Dewey's ideas of learning through...... participation. A link between morality and learning via knowledge production is to be found in the concept of participation due to an understanding of education as constitutive for a democratic society.The aim is to sharpen and discuss the concept of tolerance with respect to both strength and limits...... of the concept. Project group work is an example of a social setting in an educational context where collaboration between students on the one hand is seen as a way to stimulate processes of learning  and on the other hand to strengthen social and moral competences. To be discussed in the paper is how group work...

  9. Writing the Book…Literally: The Convergence of Authentic Intellectual Work (AIW) and Project-Based Learning (PBL)

    Science.gov (United States)

    Buckmiller, Tom M.; Kruse, Jerrid W.

    2015-01-01

    Using the Project-Based Learning (PBL) and Authentic Intellectual Work (AIW) models, we sought to create coursework that had value beyond the classroom. Refinements in the self-publishing book industry provide the opportunity to present student work to a larger audience and in a different, more engaging format. With the help of free software, our…

  10. [Experience of knowledge translation in the ITSAL (immigration, work and health) research project with representatives of the target population].

    Science.gov (United States)

    Ronda, Elena; López-Jacob, M José; Paredes-Carbonell, Joan J; López, Pilar; Boix, Pere; García, Ana M

    2014-01-01

    This article describes the experience of knowledge translation between researchers of the ITSAL (immigration, work and health) project and representatives of organizations working with immigrants to discuss the results obtained in the project and future research lines. A meeting was held, attended by three researchers and 18 representatives from 11 institutions. Following a presentation of the methodology and results of the project, the participants discussed the results presented and research areas of interest, thus confirming matches between the two sides and obtaining proposals of interest for the ITSAL project. We understand the process described as an approach to social validation of some of the main results of this project. This experience has allowed us to open a channel of communication with the target population of the study, in line with the necessary two-way interaction between researchers and users. Copyright © 2013 SESPAS. Published by Elsevier Espana. All rights reserved.

  11. Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach

    OpenAIRE

    Miao, Yongwu; Sloep, Peter; Koper, Rob

    2009-01-01

    Miao, Y., Sloep, P. B., & Koper, R. (2010). Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach. In D. Griffiths & R. Koper (Eds.), Rethinking Learning and Employment at a Time of Economic Uncertainty. Proceedings of the 6th TENCompetence Open workshop (pp. 22-33). November, 19-20, 2009, Manchester, UK. Bolton, UK: Institute for Educational Cybernetics, The University of Bolton. For the complete book please see http://hdl.handle.net/1820/3191

  12. Applied Railway Optimization in Production Planning at DSB-S-tog - Tasks, Tools and Challenges

    DEFF Research Database (Denmark)

    Clausen, Jens

    2007-01-01

    these conflicting goals. S-tog has therefore on the strategic level decided to use software with optimization capabilities in the planning processes. We describe the current status for each activity using optimization or simulation as a tool: Timetable evaluation, rolling stock planning, and crew scheduling...... to the customers, and has concurrently been met with demands for higher efficiency in the daily operation. The plans of timetable, rolling stock and crew must hence allow for a high level of customer service, be efficient, and be robust against disturbances of operations. It is a highly non-trivial task to meet....... In addition we describe on-going efforts in using mathematical models in activities such as timetable design and work-force planning. We also identify some organizatorial key factors, which have paved the way for extended use of optimization methods in railway production planning....

  13. Cosmic radiation and airline pilots. Exposure patterns of Norwegian pilots flying aircraft not used by SAS

    International Nuclear Information System (INIS)

    Tveten, U.

    1997-05-01

    The work which is presented in this report is part of a Norwegian epidemiological project, carried out in cooperation between Institutt for Energiteknikk (IFE), the Norwegian Cancer Registry (NCR) and the Norwegian Radiation Protection Authority (NRPA). The project has been partially financed by the Norwegian Research Council. Originating from the Norwegian project, a number of similar projects have been started or are in the planning stage in a number of European countries. The present report lays the ground for estimation of individual exposure histories to cosmic radiation of pilots flying a great diversity of different aircrafts. Aircrafts that appear in the time-tables of the Scandinavian Airline System (SAS) have been treated in an earlier report. The results presented in this report (radiation doserates for the different types of aircrafts in the different years) will, in a later stage of the project be utilized to estimate the individual radiation exposure histories. The major sources of information used as basis for the work in this report is information provided by several active pilots, members of the Pilots Associations, along with calculations performed using US Federal Aviation Administration's computer code CARI-3N. 2 refs

  14. Cosmic radiation and airline pilots. Exposure patterns of Norwegian pilots flying aircraft not used by SAS

    Energy Technology Data Exchange (ETDEWEB)

    Tveten, U.

    1997-05-01

    The work which is presented in this report is part of a Norwegian epidemiological project, carried out in cooperation between Institutt for Energiteknikk (IFE), the Norwegian Cancer Registry (NCR) and the Norwegian Radiation Protection Authority (NRPA). The project has been partially financed by the Norwegian Research Council. Originating from the Norwegian project, a number of similar projects have been started or are in the planning stage in a number of European countries. The present report lays the ground for estimation of individual exposure histories to cosmic radiation of pilots flying a great diversity of different aircrafts. Aircrafts that appear in the time-tables of the Scandinavian Airline System (SAS) have been treated in an earlier report. The results presented in this report (radiation doserates for the different types of aircrafts in the different years) will, in a later stage of the project be utilized to estimate the individual radiation exposure histories. The major sources of information used as basis for the work in this report is information provided by several active pilots, members of the Pilots Associations, along with calculations performed using US Federal Aviation Administration`s computer code CARI-3N. 2 refs.

  15. 75 FR 43919 - Energy and Infrastructure Mission to Saudi Arabia: Third City Stop Added to the Trade Mission...

    Science.gov (United States)

    2010-07-27

    ... and Dhahran; and Networking receptions in two cities of the trade mission. Proposed Mission Timetable... Saudi Arabia: Third City Stop Added to the Trade Mission Itinerary AGENCY: International Trade... expansion at Jubail Industrial City II with around 20 petrochemical and infrastructure projects worth more...

  16. Site observational work plan for the UMTRA Project site at Falls City, Texas

    International Nuclear Information System (INIS)

    1995-06-01

    Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy

  17. Earth-moving equipment as base machines in forest work. Final report of an NSR project

    Energy Technology Data Exchange (ETDEWEB)

    Johansson, Jerry [ed.

    1997-12-31

    Excavators have been used for forest draining for a long time in the Nordic countries. Only during the 1980s they were introduced as base machines for other forest operations, such as mounding, processing, harvesting, and road construction and road maintenance. Backhoe loaders were introduced in forestry at a somewhat later stage and to a smaller degree. The number of this type of base machines in forestry is so far small and is increasing very slowly. The NSR project `Earth moving equipment as base machines in forest work` started in 1993 and the project ended in 1995. The objective of the project was to obtain an overall picture of this type of machines up to a point where the logs are at landing site, ready for transportation to the industry. The project should cover as many aspects as possible. In order to obtain this picture, the main project was divided into sub projects. The sub projects separately described in this volume are (1) Excavators in ditching operations and site preparation, (2) Backhoe loaders in harvesting operations, (3) Excavators in wood cutting operations, (4) Tracked excavators in forestry operations, (5) Crawler versus wheeled base machines for single-grip harvester, and (6) Soil changes - A comparison between a wheeled and a tracked forest machine

  18. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  19. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  20. Human errors in test and maintenance of nuclear power plants. Nordic project work

    International Nuclear Information System (INIS)

    Andersson, H.; Liwaang, B.

    1985-08-01

    The present report is a summary of the NKA/LIT-1 project performed for the period 1981-1985. The report summarizes work on human error influence in test and calibration activities in nuclear power plants, reviews problems regarding optimization of the test intervals, organization of test and maintenance activities, and the analysis of human error contribution to the overall risk in test and mainenace tasks. (author)

  1. Integer programming techniques for educational timetabling

    DEFF Research Database (Denmark)

    Fonseca, George H.G.; Santos, Haroldo G.; Carrano, Eduardo G.

    2017-01-01

    in recent studies in the field. This work presents new cuts and reformulations for the existing integer programming model for XHSTT. The proposed cuts improved hugely the linear relaxation of the formulation, leading to an average gap reduction of 32%. Applied to XHSTT-2014 instance set, the alternative...... formulation provided four new best known lower bounds and, used in a matheuristic framework, improved eleven best known solutions. The computational experiments also show that the resulting integer programming models from the proposed formulation are more effectively solved for most of the instances....

  2. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  3. Fabrication and installment of hard-wired I and C works for the neutral beam injection system of the KSTAR project

    International Nuclear Information System (INIS)

    Jung, Ki Sok; Oh, Byung Hun; In, Sang Ryul; Yoon, Jae Sung

    2004-01-01

    Instrumentation and Control(I and C) of the neutral beam injection(NBI) system for the K-STAR national fusion research project has been working from the start of the project to answer diverse requests arising from various facets of the development and construction phases of the project. In a parallel effort with the software oriented I and C development, there has been existing an enormous amount of hard-wiring I and C works for the NBI facility to be developed and fabricated in schedule. Circuits and hardwired functions have been designed, tested, fabricated, and finally installed to the relevant parts of the system. Some examples of those hard-wired I and C works are related to the vacuum system, gas feeding system, arc detector circuit, ion source monitoring, bending magnet and calorimeter. They are one of those integral parts for the proper operation of the NBI system. Examples of those hard-wired I and C works are introduced in this presentation

  4. Organization of project works in Industry 4.0 digital item designing companies

    Science.gov (United States)

    Gurjanov, A. V.; Zakoldaev, D. A.; Shukalov, A. V.; Zharinov, I. O.

    2018-05-01

    The task of the project works organization in the Industry 4.0 item designing digital factories is being studied. There is a scheme of the item designing component life cycle. There is also a scheme how to develop and confirm the quality of the item designing component documentation using the mathematical modelling. There is a description of the self-organization principles for the cyber and physical technological equipment in the Industry 4.0 «smart factory» company during the manufacturing process.

  5. The GENERATE Project: Curricular and Pedagogical Inspiration from Parents and Their Children Working Together

    Science.gov (United States)

    Barnes, Jonathan

    2010-01-01

    This report summarizes GENERATE, a pilot research project conducted by 12 artists and their children 3-14. Simply put, these artist/art educator/parents allowed their own children unlimited access to their studios, materials, equipment and workspaces for two years. During that time the children were able to work alongside their parents on making…

  6. Project W-236A, work plan for preparation of a design requirements document

    International Nuclear Information System (INIS)

    Groth, B.D.

    1995-01-01

    This work plan outlines the tasks necessary, and defines the organizational responsibilities for preparing a Design Requirements Document (DRD) for project W-236A, Multi-Function Waste Tank Facility (MWTF). A DRD is a Systems Engineering document which bounds, at a high level, the requirements of a discrete system element of the Tank Waste Remediation System (TWRS) Program. This system element is usually assigned to a specific project, in this case the MWTF. The DRD is the document that connects the TWRS program requirements with the highest level projects requirements and provides the project's link to the overall TWRS mission. The MWTF DRD effort is somewhat unique in that the project is already in detailed design, whereas a DRO is normally prepared prior to preliminary design. The MWTF design effort was initiated with a Functional Design Criteria (FDC) and a Supplemental Design Requirements Document (SDRD) bounding the high level requirements. Another unique aspect of this effort is that some of the TWRS program requirements are still in development. Because of these unique aspects of the MWTF DRD development, the MWTF will be developed from existing TWRS Program requirements and project specific requirements contained in the FDC and SDRD. The following list describes the objectives of the MWTF DRD: determine the primary functions of the tanks through a functional decomposition of the TWRS Program high level functions; allocate the primary functions to a sub-system architecture for the tanks; define the fundamental design features in terms of performance requirements for the system and subsystems; identify system interfaces and design constraints; and document the results in a DRD

  7. Ergonomic project of the work and innovation in the virtual-actual dynamic: a theoretical-conceptual contribution

    Directory of Open Access Journals (Sweden)

    Gilbert Cardoso Bouyer

    2015-12-01

    Full Text Available The main purpose of this paper is to amplify the current theoretical scenario of “Ergonomics of Project” area, according to the knowledge creation/innovation theory, and his concepts of virtual and subjectivity in the Work. This theoretical-conceptual article aims to shed new light on the relations between innovation and present-day efforts toward a scientific theory of knowledge in the Work, with its complex structure of theories, hypotheses and disciplines. There is in this paper a new approach to understand  the Contemporary Ergonomic Project in a kind of Socio-Epistemological Engineering initiated by Markus F. Peschl in the University of Vienna. The methods employed were the systematic review and adaptation of Socio-Epistemological Engineering’s concepts in the actual context of epistemological and ontological principles of Ergonomics of Project.

  8. Report on the research and development work of 1984 in the project atomic fusion

    International Nuclear Information System (INIS)

    Finken, D.

    1985-02-01

    The work done by the Nuclear Research Centre in Karlsruhe on fusion under magnetic influence is compiled in the project atomic fusion and put in the programme for European Fusion Technology. The work is supported by an association contract between KfK and Euratom via the European Commission. Some of the work exceeds the volume defined in the E.E.C's technology programme. Using these papers, mostly studies, connections are established between the various fields of work and new tasks prepared. This is taking place in the light of the expected extension of the technology programme in the coming year and the plans for NET. The reports compiled here are the 1984 papers from the KfK institute. The appendix contains a compilation of the tasks undertaken by KfK from the EEC's fusion technology programme. (orig./GG) [de

  9. Identification of Design Work Patterns by Retrospective Analysis of Work Sheets

    DEFF Research Database (Denmark)

    Hansen, Claus Thorp

    1999-01-01

    project is carried out where we seek to identify design work patterns by retrospective analysis of documentation created during design projects.An elements to satisfy the wish for an efficient design process could be to identify work patterns applied by engineering designers, evaluate these patterns...... with respect to their efficiency, and reuse the most efficient in future projects. Thus, the objective of this research is to analyse design projects in order to identify the work patterns applied. Based on an evaluation of identified work patterns we expect a recommendation of work patterns supporting...... an efficient design process can be established.In this paper we describe the analysis method, and present observations from analyses of three projects....

  10. CERN Management & Communication Training programme

    CERN Multimedia

    HR Department

    2009-01-01

    Timetable of courses from September to December 2009 Please check our Web site to find out the number of places available, which may vary. Management Curriculum Project Scheduling & Costing\t3, 4 September (full) Communicating Effectively – Residential\t15, 16, 17 September (5 places available) Personal Awareness & Impact – Follow-up\t17, 18 September (2 places available) Project Management\t22, 23 September (full) Personal Awareness & Impact\t22, 23, 24 September (full) Introduction to Leadership\t7, 8, 9 October (full) Managing Teams\t10, 11, 12 November (full) Communication Curriculum Managing Time\t22 September + 27 October + 18 November (8 places available) Making presentations\t14, 15 October + 9 November (Full) Communiquer efficacement dans votre équipe\t19, 20 octobre (2 places disponibles) Communiquer efficacement\t21, 22 octobre + 9, 10 novembre (1 place disponible) Techniques d’exposé et de présentations\t10, 11 novembre + 8 décembre (1...

  11. CERN Management & Communication Training programme

    CERN Multimedia

    HR Department

    2009-01-01

    Timetable of courses from September to December 2009 Please check our Web site to find out the number of places available, which may vary. Management Curriculum Project Scheduling & Costing\t3, 4 September (2 places available) Communicating Effectively – Residential\t15, 16, 17 September (6 places available) Personal Awareness & Impact – Follow-up\t17, 18 September (full) Project Management\t22, 23 September (full) Personal Awareness & Impact\t22, 23, 24 September (full) Introduction to Leadership\t7, 8, 9 October (full) Managing Teams\t10, 11, 12 November (full) Communication Curriculum Managing Time\t22 September + 27 October + 18 November (3 places available) Making presentations\t14, 15 October + 9 November (Full) Communiquer efficacement dans votre équipe\t19, 20 octobre (complet) Communiquer efficacement\t21, 22 octobre + 9, 10 novembre (complet) Techniques d’exposé et de présentations\t10, 11 novembre + 8 décembre (1 place disponible) Serv...

  12. CERN Management & Communication Training programme

    CERN Multimedia

    HR Department

    2009-01-01

    Timetable of courses from September to December 2009 Please check our web site to find out the number of places available, which may vary. Management Curriculum Project Scheduling & Costing\t3, 4 September (2 places available) Communicating Effectively – Residential\t15, 16, 17 September (6 places available) Personal Awareness & Impact – Follow-up\t17, 18 September (full) Project Management\t22, 23 September (full) Personal Awareness & Impact\t22, 23, 24 September (full) Introduction to Leadership\t7, 8, 9 October (full) Managing Teams\t10, 11, 12 November (full) Communication Curriculum Managing Time\t22 September + 27 October + 18 November (3 places available) Making presentations\t14, 15 October + 9 November (Full) Communiquer efficacement dans votre équipe\t19, 20 octobre (complet) Communiquer efficacement\t21, 22 octobre + 9, 10 novembre (complet) Techniques d’exposé et de présentations\t10, 11 novembre + 8 décembre (1 place disponible) Service Orientation/Orienta...

  13. EASYTRACK Project: Work package 3

    DEFF Research Database (Denmark)

    Savio, Enrico; De Chiffre, Leonardo

    ). For this project, the Centre for Geometrical Metrology (CGM) at the Technical University of Denmark (DTU) has taken care of freeform measurements, in collaboration with the Dipartimento di Innovazione Meccanica e Gestionale (DIMEG) - University of Padova - Italy. The present report describes feasibility...... and experimental results of calibrations of freeform parts on CMMs as contribution to development of the ISO 15530 series of standards currently under consideration by the ISO TC 213/WG10....

  14. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  15. Site observational work plan for the UMTRA Project site at Spook, Wyoming

    International Nuclear Information System (INIS)

    1995-05-01

    The Spook, Wyoming, site observational work plan proposes site-specific activities to achieve compliance with Subpart B of 40 CFR Part 192 (1994) of the final US Environmental Protection Agency (EPA) ground water protection standards 60 FR 2854 (1995) at this Uranium Mill Tailing Remedial Action (UMTRA) Project site. This draft SOWP presents a comprehensive summary of existing site characterization data, a conceptual site model of the nature and extent of ground water contamination, exposure pathways, and potential impact to human health and the environment. Section 2.0 describes the requirements for meeting ground water standards at UMTRA Project sites. Section 3.0 defines past and current conditions, describes potential environmental and human health risks, and provides site-specific data that supports the selection of a proposed ground water compliance strategy. Section 4.0 provides the justification for selecting the proposed ground water compliance strategy based on the framework defined in the ground water programmatic environmental impact statement (PEIS)

  16. Flexible working hours, health, and well-being in Europe: some considerations from a SALTSA project

    NARCIS (Netherlands)

    Costa, Giovanni; Akerstedt, Torbjorn; Nachreiner, Friedhelm; Baltieri, Federica; Carvalhais, José; Folkard, Simon; Frings-Dresen, Monique; Gadbois, Charles; Gartner, Johannes; Sukalo, Hiltraud Grzech; Härmä, Mikko; Kandolin, Irja; Sartori, Samantha; Silvério, Jorge

    2004-01-01

    The project brought together researchers from 9 EU-Countries and resulted in a number of actions, in particular the following: (a) There is an urgent need of defining the concept of flexible working hours, since it has been used in many different and even counterintuitive ways; the most obvious

  17. Production of NDA Working Reference Materials for the Capability Evaluation Project

    International Nuclear Information System (INIS)

    Noll, P.D. Jr.; Marshall, R.S.

    1998-01-01

    The production of Non Destructive Assay (NDA) Working Reference Materials (WRMs) that are traceable to nationally recognized standards was undertaken to support implementation of the Idaho National Engineering and Environmental Laboratory (INEEL) Nondestructive Waste Assay Capability Evaluation Project (CEP). The WRMs produced for the CEP project consist of Increased Am/Pu mass ration (IAP) and depleted Uranium (DU) WRMs. The CEP IAP/DU WRM set provides radioactive material standards for use in combination with 55 gallon drum waste matrix surrogates for the assessment of waste NDA assay system performance. The Production of WRMs is a meticulous process that is not without certain trials and tribulations. Problems may arise at any of the various stages of WRM production which include, but are not limited to; material characterization (physical, chemical, and isotopic), material blend parameters, personnel radiation exposure, gas generation phenomenon, traceability to national standards, encapsulation, statistical evaluation of the data, and others. Presented here is an overall description of the process by which the CEP WRMs were produced and certified as well as discussions pertaining to some of the problems encountered and how they were solved

  18. Project Kaleidoscope: Advancing What Works in Undergraduate STEM Education

    Science.gov (United States)

    Elrod, S.

    2011-12-01

    In 1989, Project Kaleidoscope (PKAL) published its first report, What Works: Building Natural Science Communities, on reforming undergraduate STEM (science, technology, engineering and mathematics) education. Since then, PKAL has grown into a national organization comprised of a diverse group of over 6500 STEM educators who are committed to advancing "what works." The PKAL mission is to be a national leader in catalyzing the efforts of people, institutions, organizations and networks to move from analysis to action in significantly improving undergraduate student learning and achievement in STEM (science, technology, engineering and mathematics). Specifically, PKAL's strategic goals are to: 1) Promote the development and wider use of evidence-based teaching, learning and assessment approaches, 2) Build individual and organizational capacity to lead change in STEM education, and 3) Engage the broader community of external stakeholders - professional and disciplinary societies, business and industry groups, accreditation organizations, educational associations, governmental agencies, philanthropic organizations - in achieving our mission. PKAL achieves these goals by serving as the nexus of an interconnected and multidisciplinary web of people, ideas, strategies, evidence and resources focused on systemic change in undergraduate STEM education. PKAL also provides resources on critical issues, such as teaching using pedagogies of engagement, and engages interested faculty, campuses and professional societies in national projects and programs focused on cutting edge issues in STEM education. One of these projects - Mobilizing Disciplinary Societies for a Sustainable Future - is engaging eleven disciplinary societies, including the National Association of Geoscience Teachers, in defining specific resources, faculty development programs and goals focused on promoting undergraduate STEM courses that: 1) provide more knowledge about real-world issues; 2) connect these real

  19. The Web as process tool and product environment for group-based project work in higher education

    NARCIS (Netherlands)

    Collis, Betty; Andernach, Toine; van Diepen, N.M.; Maurer, Hermann

    1996-01-01

    This paper discusses problems confronting the use of group-based project work as an instructional strategy in higher education, and describes two technical courses (i.e., courses in online learning and applications of business information technology) at the University of Twente (Netherlands) in

  20. Double Girder Bridge Crane with Double Cycling: Scheduling Strategy and Performance Evaluation

    Directory of Open Access Journals (Sweden)

    Dandan Wang

    2014-01-01

    Full Text Available This paper introduces a novel quay crane design, double girder bridge crane (DGBC. DGBC is capable of handling containers of two adjacent bays simultaneously, avoiding crane collisions, saving travelling and reposition cost, and eventually improving terminal efficiency. This problem is formulated as a resource-constrained project scheduling with objective to minimize the maximum completion time. A two-stage heuristic algorithm is proposed in which an operating sequences on each bay is obtained by double cycling, and the integrated timetable for both bays is constructed by solving resource conflicts using the proposed minimum cost strategy. We examine effectiveness and performance of applying DGBC with double cycling. A case study is presented to illustrate how DGBC works with the two-stage method. Three extreme cases with respective conflict types are investigated to develop the performance bounds of DGBC with double cycling. The results show that DGBC can significantly improve terminal productivity, and outperforms single girder crane in both makespan and the lift operation percentage. The highest DGBC efficiency does not require maximum double cycles in two bay schedules; rather the integrated timetable for two bays is the main contribution to the DGBC performance as it yields better cooperation between two spreaders and the driver.

  1. Developing a viable electric bus service: the Milton Keynes demonstration project

    OpenAIRE

    Miles, John; Potter, Stephen

    2014-01-01

    Buses can be a serious source of city centre air pollution. Electric buses deliver zero emissions but, because of the time required to recharge, more buses are needed for a given timetable than diesel counterparts, so making mainstream electric bus operations prohibitively expensive.\\ud \\ud Early 2014 saw the implementation in Milton Keynes of an electric bus service designed to overcome this problem. An entire bus route has been converted to electric operation with inductive charging at bus ...

  2. DEVELOPMENT OF DIGITAL COMPETENCIES OF PRIMARY SCHOOL TEACHERS THROUGH BUILDING KNOWLEDGE AND SKILLS FOR WORKING WITH VISUAL PROGRAMMING ENVIRONMENT WITHIN MATH PROJECT WORK

    Directory of Open Access Journals (Sweden)

    Rumyana Y. Papancheva

    2017-07-01

    Full Text Available The paper presents a review of the contemporary school, the digital generation and the need of teachers equipped with new knowledge and skills, in particular – basic programming skills. The last change of educational system in Bulgaria after the adoption of the new pre-school and general school education act is analysed. New primary school curricula and new standards for teacher’s qualification were implemented. The new school subject “Computer modelling” is presented. Some experience of the authors from project-based work in mathematics with teachers and students is described. The aim is the formation of skills of programming by working within Scratch – visual environment for block-based coding. Some conclusions and ideas for future work are formulated.

  3. Proposal for the award of a contract for the wood construction work for the Globe of Innovation project

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the wood construction work for the Globe of Innovation project. A call for tenders (IT-3260/ST/GIR) was sent on 31 October 2003 to twelve firms in one Member State. By the closing date, CERN had received five tenders from four firms and one consortium. The Finance Committee is invited to agree to the negotiation of a contract with CIB (CH), the lowest bidder, for the wood construction work for the Globe of Innovation project for an estimated amount not exceeding 820 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: CH - 100%.

  4. SELECTING WORKING TEAMS FOR INFORMATION TECHNOLOGY OUTSOURCING PROJECTS THROUGH A COMBINATION OF METHODOLOGIES

    Directory of Open Access Journals (Sweden)

    María Alejandra Castellini

    Full Text Available ABSTRACT This paper deals with a problem that Information Technology outsourcing suppliers generally face when selecting a working team technically capable for specific roles in software development projects. A combination of methodologies, interactively integrated, is proposed. They are Soft System Methodology to structure the problem, Repertory Grid for individual interviews and elicitation of the selection criteria, DRV Processes to assess the candidates and to generate knowledge and consensus on the selection process and Linear Programming to assign people to each position. This multimethodology allowed finding a more comprehensive solution than that initially requested by the company, since it helped to establish the necessary transformations for the selection model to operate in the right way, set the competencies to be considered as selection criteria, develop a consensus estimate of the weighted criteria, and award global values to candidates, optimizing the assignment of roles in the group for the project.

  5. Learning network theory : its contribution to our understanding of work-based learning projects and learning climate

    NARCIS (Netherlands)

    Poell, R.F.; Moorsel, M.A.A.H. van

    1996-01-01

    This paper discusses the relevance of Van der Krogt's learning network theory (1995) for our understanding of the concepts of work-related learning projects and learning climate in organisations. The main assumptions of the learning network theory are presented and transferred to the level of

  6. Working Group 7.0 Environmental Transport and Health Effects, Chernobyl Studies Project. Progress report, October 1994 -- March 1995

    International Nuclear Information System (INIS)

    Anspaugh, L.R.; Hendrickson, S.M.

    1995-01-01

    This document presents the details from the working group 7.0 Chernobyl Studies Project. This working group looked at the environmental transport and health effects from the fallout due to the meltdown of Chernobylsk-4 reactor. Topics include: hydrological transport; chromosome painting dosimetry; EPR, TL and OSL dosimetry; stochastic effects; thyroid studies; and leukemia studies

  7. Student-Identified Strengths and Challenges of Using Blackboard for Group Projects in a Social Work Course

    Directory of Open Access Journals (Sweden)

    Melissa B. Littlefield

    2002-05-01

    Full Text Available Blackboard (TM provides social work educators integrated online communication tools that they can employ to facilitate student learning through features such as e-mail, discussion forums, file exchange, virtual classroom, and links to online resources. This study describes students’ experiences using Blackboard (TM to support a group project assignment. The majority of students found it easy to use and useful for the project, and indicated that they would like to use it in other courses. In addition, students gained technical skills as a result of the group project. Students’ group project grades and final course grades were comparable to those in other sections of the same course taught by this investigator. The findings of this study suggest that online technology can be used to facilitate group assignments for MSW students. The benefits include increased efficiency of group functioning and increased accountability of group members. The challenges include technical problems and student resistance to using the technology.

  8. New way of working: Professionals' expectations and experiences of the Culture and Health Project for clients with psychiatric disabilities: A focus group study.

    Science.gov (United States)

    Wästberg, Birgitta A; Sandström, Boel; Gunnarsson, Anna Birgitta

    2018-02-01

    There is a need for various types of interventions when meeting needs of clients with psychiatric disabilities and complementary interventions may also influence their well-being. The Culture and Health project, based on complementary interventions with 270 clients, was created in a county in Sweden for clients with psychiatric disabilities and for professionals to carry out the interventions. The aim of this study was to investigate the professionals' expectations regarding the project and their clients' possibilities for participating, and to investigate the professionals' experiences of the project after its completion. Focus group data with a total of 30 professionals participating were collected. A qualitative content analysis revealed four categories of the professionals' expectations before entering the project: "Clients' own possibilities and limitations for their development and independence", "Professionals' possibilities for supporting the clients", "Societal prerequisites", and "Expectations of a new way of working". Furthermore, the analysis regarding professionals' experiences after working with the project revealed three categories: "Adopting the challenges", "Having ways of working that function - prerequisites and possibilities", and "Meeting the future - an ambition to continue". Working in the Culture and Health project together with the clients in group-based activities was perceived as beneficial, although challenges arose. When implementing cultural activities, support from stakeholder organisations is needed. © 2017 Australian College of Mental Health Nurses Inc.

  9. Teaching and Learning English through the Project Work. Innovative Pilot Teaching Project in the Pre-school and Primary School Pompeu Fabra, Vallirana, Barcelona. Investigation in Action comprehension in Primary Education

    Directory of Open Access Journals (Sweden)

    Verónica Asensio Arjona

    2017-12-01

    Full Text Available In order to impulse a methodology focused on the student, teachers have to establish the learning conditions that allow them to develop the experimentation, creativity, challenge and individual development. Below this framework, a Project Work of Teaching-Learning English as a foreign language is designed and applied at the state school Pompeu Fabra, Vallirana, Barcelona during the scholar year 2013-2014. The methodology of project work is chosen because it is the most appropriated methodology to achieve a learning focused on the student. It is executed an Action Research of the application of this Project in order to evaluate the competential progress of students. Quantitative and qualitative tools are used to execute the research. The quantitative tools are a standardized test and a Survey. The first one is applied in two moments, in October and in June, to evaluate the progress. The results are analyzed with Excel Tools to calculate the general average and each competence average. On the other hand, the qualitative tools that are used are: The Satisfaction and Self-perception Survey, validated by the University of Barcelona; the Teacher Diary of Observation; and an Evaluation Table for the Speaking. The triangulation of all the information show the English competence of student’s increase; as well as the interest of students in the English learning and the satisfaction in doing it also increases. Moreover, the Project Work is highly qualified by students as: the best activity to learn and enjoy it. This research obtains satisfactory results. It is a sample of innovation in teaching and learning English as a foreign language. As a result, the school decides to continue using the Project Work in the next scholar year.

  10. The WorkQueue project - a task queue for the CMS workload management system

    Science.gov (United States)

    Ryu, S.; Wakefield, S.

    2012-12-01

    We present the development and first experience of a new component (termed WorkQueue) in the CMS workload management system. This component provides a link between a global request system (Request Manager) and agents (WMAgents) which process requests at compute and storage resources (known as sites). These requests typically consist of creation or processing of a data sample (possibly terabytes in size). Unlike the standard concept of a task queue, the WorkQueue does not contain fully resolved work units (known typically as jobs in HEP). This would require the WorkQueue to run computationally heavy algorithms that are better suited to run in the WMAgents. Instead the request specifies an algorithm that the WorkQueue uses to split the request into reasonable size chunks (known as elements). An advantage of performing lazy evaluation of an element is that expanding datasets can be accommodated by having job details resolved as late as possible. The WorkQueue architecture consists of a global WorkQueue which obtains requests from the request system, expands them and forms an element ordering based on the request priority. Each WMAgent contains a local WorkQueue which buffers work close to the agent, this overcomes temporary unavailability of the global WorkQueue and reduces latency for an agent to begin processing. Elements are pulled from the global WorkQueue to the local WorkQueue and into the WMAgent based on the estimate of the amount of work within the element and the resources available to the agent. WorkQueue is based on CouchDB, a document oriented NoSQL database. The WorkQueue uses the features of CouchDB (map/reduce views and bi-directional replication between distributed instances) to provide a scalable distributed system for managing large queues of work. The project described here represents an improvement over the old approach to workload management in CMS which involved individual operators feeding requests into agents. This new approach allows for a

  11. The WorkQueue project - a task queue for the CMS workload management system

    International Nuclear Information System (INIS)

    Ryu, S; Wakefield, S

    2012-01-01

    We present the development and first experience of a new component (termed WorkQueue) in the CMS workload management system. This component provides a link between a global request system (Request Manager) and agents (WMAgents) which process requests at compute and storage resources (known as sites). These requests typically consist of creation or processing of a data sample (possibly terabytes in size). Unlike the standard concept of a task queue, the WorkQueue does not contain fully resolved work units (known typically as jobs in HEP). This would require the WorkQueue to run computationally heavy algorithms that are better suited to run in the WMAgents. Instead the request specifies an algorithm that the WorkQueue uses to split the request into reasonable size chunks (known as elements). An advantage of performing lazy evaluation of an element is that expanding datasets can be accommodated by having job details resolved as late as possible. The WorkQueue architecture consists of a global WorkQueue which obtains requests from the request system, expands them and forms an element ordering based on the request priority. Each WMAgent contains a local WorkQueue which buffers work close to the agent, this overcomes temporary unavailability of the global WorkQueue and reduces latency for an agent to begin processing. Elements are pulled from the global WorkQueue to the local WorkQueue and into the WMAgent based on the estimate of the amount of work within the element and the resources available to the agent. WorkQueue is based on CouchDB, a document oriented NoSQL database. The WorkQueue uses the features of CouchDB (map/reduce views and bi-directional replication between distributed instances) to provide a scalable distributed system for managing large queues of work. The project described here represents an improvement over the old approach to workload management in CMS which involved individual operators feeding requests into agents. This new approach allows for a

  12. The WorkQueue project: A task queue for the CMS workload management system

    Energy Technology Data Exchange (ETDEWEB)

    Ryu, S. [Fermilab; Wakefield, Stuart [Imperial Coll., London

    2012-01-01

    We present the development and first experience of a new component (termed WorkQueue) in the CMS workload management system. This component provides a link between a global request system (Request Manager) and agents (WMAgents) which process requests at compute and storage resources (known as sites). These requests typically consist of creation or processing of a data sample (possibly terabytes in size). Unlike the standard concept of a task queue, the WorkQueue does not contain fully resolved work units (known typically as jobs in HEP). This would require the WorkQueue to run computationally heavy algorithms that are better suited to run in the WMAgents. Instead the request specifies an algorithm that the WorkQueue uses to split the request into reasonable size chunks (known as elements). An advantage of performing lazy evaluation of an element is that expanding datasets can be accommodated by having job details resolved as late as possible. The WorkQueue architecture consists of a global WorkQueue which obtains requests from the request system, expands them and forms an element ordering based on the request priority. Each WMAgent contains a local WorkQueue which buffers work close to the agent, this overcomes temporary unavailability of the global WorkQueue and reduces latency for an agent to begin processing. Elements are pulled from the global WorkQueue to the local WorkQueue and into the WMAgent based on the estimate of the amount of work within the element and the resources available to the agent. WorkQueue is based on CouchDB, a document oriented NoSQL database. The WorkQueue uses the features of CouchDB (map/reduce views and bi-directional replication between distributed instances) to provide a scalable distributed system for managing large queues of work. The project described here represents an improvement over the old approach to workload management in CMS which involved individual operators feeding requests into agents. This new approach allows for a

  13. Strategy For Implementing The UN "Zero-Gravity Instrument Project" To Promote Space Science Among School Children In Nigeria

    Science.gov (United States)

    Alabi, O.; Agbaje, G.; Akinyede, J.

    2015-12-01

    The United Nations "Zero Gravity Instrument Project" (ZGIP) is one of the activities coordinated under the Space Education Outreach Program (SEOP) of the African Regional Centre for Space Science and Technology Education in English (ARCSSTE-E) to popularize space science among pre-collegiate youths in Nigeria. The vision of ZGIP is to promote space education and research in microgravity. This paper will deliberate on the strategy used to implement the ZGIP to introduce school children to authentic scientific data and inquiry. The paper highlights how the students learned to collect scientific data in a laboratory environment, analyzed the data with specialized software, obtained results, interpreted and presented the results of their study in a standard format to the scientific community. About 100 school children, aged between 7 and 21 years, from ten public and private schools located in Osun State, Nigeria participated in the pilot phase of the ZGIP which commenced with a 1-day workshop in March 2014. During the inauguration workshop, the participants were introduced to the environment of outer space, with special emphasis on the concept of microgravity. They were also taught the basic principle of operation of the Clinostat, a Zero-Gravity Instrument donated to ARCSSTE-E by the United Nations Office for Outer Space Affairs (UN-OOSA), Vienna, under the Human Space Technology Initiative (UN-HSTI). At the end of the workshop, each school designed a project, and had a period of 1 week, on a planned time-table, to work in the laboratory of ARCSSTE-E where they utilized the clinostat to examine the germination of indigenous plant seeds in simulated microgravity conditions. The paper also documents the post-laboratory investigation activities, which included presentation of the results in a poster competition and an evaluation of the project. The enthusiasm displayed by the students, coupled with the favorable responses recorded during an oral interview conducted to

  14. Vague project start makes project success of outsourced software development projects uncertain

    OpenAIRE

    Savolainen, Paula

    2010-01-01

    peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...

  15. Analysis of the economic impact of environmental biosafety works projects in healthcare centres in extremadura (spain)

    OpenAIRE

    García Sanz-Calcedo, Justo; Monzón-González, Pedro

    2014-01-01

    The aim of this paper is to analyze the results obtained in the methodological application of techniques aimed at the maintenance of environmental biosafety in works of reform and expansion of healthcare centres in Extremadura, Spain during 2004-2010, assessing the costs of its implementation and contrasting if the use of a BSA project in phase of works affects the probability of nosocomial infection and the conditions of health and safety. The average investment accounted for a cost of 5.5 €...

  16. Promises, Premises and Risks: Sharing Responsibilities, Working Up Trust and Sustaining Commitment in Participatory Design Projects

    DEFF Research Database (Denmark)

    Büscher, Monika; Hartswood, Mark; Mogensen, Preben Holst

    2002-01-01

    While participatory design crosses the boundaries between technology production and use, it does not erase them. In accounts of participatory projects, the work of negotiating and changing these boundaries often recedes into the background, yet it is crucial in shaping the very nature and scope o...

  17. Working capital management in the process of financial support of investment and construction projects and of the construction material industry

    Science.gov (United States)

    Danilochkina, Nadezhda; Lukmanova, Inessa; Roshchina, Olga; Voytolovskiy, Nikolay

    2018-03-01

    The article presents the analysis of working capital in the process of financial support of high-rise construction investment projects. The factors influencing the choice of the working capital management model were analyzed, the reasons of the change in the requirement for the values of current assets in the process of construction of high-rise facilities were determined. The author has developed the scheme of interrelation between production, operational and financial activity cycles of enterprises implementing investment projects of unique buildings and structures and made a comparative description of their financing sources.

  18. Summary report of the third research co-ordination meeting on improvement of the standard cross sections

    International Nuclear Information System (INIS)

    Carlson, A.D.; Hale, G.M.; Pronyaev, V.G.

    2004-11-01

    Results were discussed that have been obtained during two and a half years of work under the Coordinated Research Project (CRP) on Improvement of the Standard Cross Sections. Major attention was focused on reducing the ambiguity between different R-matrix fits; seeking consensus between participants about what approach should be used to minimize the effect of Peelle's Pertinent Puzzle; procedures for combining the results of the R-matrix model with non-model fits; and determining the reactions and energies where smoothing should be used. The proposed timetable includes the release of the standard cross section tables by 18 November 2004 and preparing a draft report with a detailed description of the evaluation procedure by 30 April 2005. (author)

  19. The Application of Neutron and X-Ray Techniques to Analyze Works of Art: Examples from The Unvarnished Truth Project

    Science.gov (United States)

    MacDonald, Brandi Lee

    2017-01-01

    When considered as an object, a painting consists of multiple components that, when analyzed together, have a unique story to tell about the artist, their practice, and the history of the work of art. Techniques traditionally applied in physics, including neutron-, x-radiographic and near-infrared imaging, and surface elemental analysis via x-ray fluorescence, are useful for generating significant insight into works of art. By examining the supporting material, grounds, pigments, and varnishes that a painter chose to utilize, we generate new knowledge regarding the composition, context, and decision-making involved in the creation of a work. The project `The Unvarnished Truth: exploring the material history of paintings' is an interdisciplinary initiative that incorporated the expertise of forensic art historians, conservation scientists, physicists, and biomedical engineers. Through the technical analysis of nine paintings from the McMaster Museum of Art permanent collection, we explored research questions related to painting technique, attribution, authenticity, connoisseurship, and object condition and stability. The paintings span over 500 years of European art history, and include works from Vincent Van Gogh, Alexander Rodchenko, and A. van der Neer. This project highlights the multitude of ways in which micro- and non-destructive methods can be used to answer art historical questions. This project is supported by grants from Canadian Heritage and Ontario Arts Council.

  20. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  1. Organization of BSc and MSc projects in project families

    DEFF Research Database (Denmark)

    Ottosen, Lisbeth M.; Goltermann, Per; Jensen, Pernille Erland

    2014-01-01

    This work reports organization of student thesis projects in project families, with the benefit to both teaching and learning. The project organization went from student projects broadly distributed on topics related to different research issues and individual supervision to project families with...

  2. Site Observational Work Plan for the UMTRA Project Site at Shiprock, New Mexico. Revision

    International Nuclear Information System (INIS)

    1995-07-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is one of the first documents for developing an approach for achieving ground water compliance at the site. This SOWP applies Shiprock site information to a regulatory compliance framework, which identifies strategies for meeting ground water compliance at the site. The compliance framework was developed in the UMTRA ground water programmatic environmental impact statement

  3. Working by projects: A way to enrich critical thinking and the writing process in a third grade eflclassroom

    Directory of Open Access Journals (Sweden)

    Sandra Dolores Ruiz

    2014-01-01

    Full Text Available This document presents the result of a qualitative action research developed with thirty-three third grade students at a public school in Bogota. This action research aimed at describing and analyzing the role of project work in the development of critical thinking in third grade efl students and to describe and document the way in which those students developed their writing skills through this methodology. The participants developed different inquiries related to topics they were interested in exploring and related to the recycling project of the school. The data were collected during eleven sessions carried out along eight months through field notes, artifacts, and audio recordings. The results show that through project work the students enhanced their emerging critical thinking skills and their writing process; improved their interactions with their classmates, discovered that learning English was something useful for their lives, and therefore they acquired more confidence in writing and speaking in English. Additionally, they became more reflective, organized and critical about what they think, what they say, and about what happens around them.

  4. Designing Project Management

    NARCIS (Netherlands)

    Heintz, John Linke; Lousberg, L.; Wamelink, J.W.F.; Saari, A.; Huovinen, P.

    2016-01-01

    In this paper we introduce the concept of Designing Project Management. On the basis of our earlier work, we suggest that there is still a gap between what is known from recent project management literature and what project managers can structurally help in the effectiveness of their work. Assuming

  5. Work plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that populations could have received from nuclear operations at the Hanford Site since 1944, with descriptions of uncertainties inherent in such estimates. The secondary objective is to make project records--information that HEDR staff members used to estimate radiation doses--available to the public. Preliminary dose estimates for a limited geographic area and time period, certain radionuclides, and certain populations are planned to be available in 1990; complete results are planned to be reported in 1993. Project reports and references used in the reports are available to the public in the DOE Public Reading Room in Richland, Washington. Project progress is documented in monthly reports, which are also available to the public in the DOE Public Reading Room.

  6. Projection: A Bibliography.

    Science.gov (United States)

    Pedrini, D. T.; Pedrini, Bonnie C.

    Sigmund Freud and his associates did much clinical work with the dynamic of projection, especially with regard to paranoid symptoms and syndromes. Much experimental work has also been done with projection. Sears evaluated the results of some of those studies. Murstein and Pryer sub-classified projection and reviewed typical studies. The…

  7. Work-based Project Overcomes Basic Skills Stigma.

    Science.gov (United States)

    Wallis, Emma

    2002-01-01

    A project to provide steel workers in North Wales with guidance about learning opportunities and to promote lifelong learning in the workplace focused on the development of basic information technology skills. (JOW)

  8. Institutional Ethnography as Materialist Framework for Writing Program Research and the Faculty-Staff Work Standpoints Project

    Science.gov (United States)

    LaFrance, Michelle; Nicolas, Melissa

    2012-01-01

    Institutional ethnography seeks to uncover how things happen--how institutional discourse compels and shapes practice(s) and how norms of practice speak to, for, and over individuals. The Faculty and Staff Standpoints project is shaped by this methodology, as it explores writing center staff and faculty relationships to their work. (Contains 10…

  9. 'Pop-Up' Governance: developing internal governance frameworks for consortia: the example of UK10K.

    Science.gov (United States)

    Kaye, Jane; Muddyman, Dawn; Smee, Carol; Kennedy, Karen; Bell, Jessica

    2015-01-01

    Innovations in information technologies have facilitated the development of new styles of research networks and forms of governance. This is evident in genomics where increasingly, research is carried out by large, interdisciplinary consortia focussing on a specific research endeavour. The UK10K project is an example of a human genomics consortium funded to provide insights into the genomics of rare conditions, and establish a community resource from generated sequence data. To achieve its objectives according to the agreed timetable, the UK10K project established an internal governance system to expedite the research and to deal with the complex issues that arose. The project's governance structure exemplifies a new form of network governance called 'pop-up' governance. 'Pop-up' because: it was put together quickly, existed for a specific period, was designed for a specific purpose, and was dismantled easily on project completion. In this paper, we use UK10K to describe how 'pop-up' governance works on the ground and how relational, hierarchical and contractual governance mechanisms are used in this new form of network governance.

  10. Site observational work plan for the UMTRA Project Site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1996-03-01

    The U.S. Department of Energy (DOE) has prepared this initial site observational work plan (SOWP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This SOWP is one of the first UMTRA Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards (40 CFR Part 192, as amended by 60 FR 2854) for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement (PEIS). This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The DOE goal is to use the observational method to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation based on the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards

  11. Public Health Nurses in Israel: A Case Study on a Quality Improvement Project of Nurse's Work Life.

    Science.gov (United States)

    Kagan, Ilya; Shachaf, Sara; Rapaport, Zofia; Livne, Tzipi; Madjar, Batya

    2017-01-01

    Public health nurses (PHNs) working in Well Baby Clinic in Israel's Haifa district were voicing great distress to inspectors-the impossibility of meeting their workload, feeling overwhelmed, poor physical, and technological conditions. They were feeling tired and frustrated and burn-out was rising. The district's nursing management took the decision, together with Tel Aviv University's nursing research unit, to conduct a quality improvement project based on issues that arose from meetings with focus groups on the nurses' difficulties. This paper is a case study of a quality improvement project targeting nurses daily working life. One of its chief contributions is as a study of meeting PHNs' frustration by integrating focus groups and round-table brainstorming (involving nurses, clinic managers and nursing inspectors) in order to identify targets for practical intervention. This strategy has been very successful. It has provided the district's nursing management a battery of forcefully argued and realistically grounded proposals for making the work of Well Baby clinics more relevant to their communities and giving nurses (a) the conditions to meet their assignments and (b) greater professional self-respect. © 2016 Wiley Periodicals, Inc.

  12. NOAA's Coral Reef Conservation Program's 2016 Projects that Work Towards Stratefic Goals to Reduce Fishing Impacts on Coral

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — In 2016 the following projects will take place to work towards CRCP's strategic goals to reduce fishing impacts on coral reefs Building GIS Long-term Capacity:...

  13. Status of project design work for a German reprocessing plant

    International Nuclear Information System (INIS)

    Lang, K.; Zuehlke, P.

    1976-01-01

    A reprocessing plant will be built within the framework of a comprehensive waste management center planned by the Federal Government to treat the fuel elements unloaded from German nuclear power stations. On the basis of an annual throughput of 1,400 te of uranium averaged over the life of the plant, the center will be able to serve between 45,000 and 50,000 MWe of installed nuclear generating capacity. A comprehensive conceptual design study of the reprocessing plant to be built has been completed on the basis of the operating experience accumulated at the Karlsruhe reprocessing plant and the development work carried out by the Karlsruhe Nuclear Research Center and in the light also of an intensive exchange of experience with British and French reprocessing companies within the framework of United Reprocessors GmbH. This conceptual design study is the foundation for the preliminary project to be carried out on a collaborative basis by KEWA and PWK. (orig.) [de

  14. Opposition multiple objective symbiotic organisms search (OMOSOS for time, cost, quality and work continuity tradeoff in repetitive projects

    Directory of Open Access Journals (Sweden)

    Duc-Hoc Tran

    2018-04-01

    Full Text Available Construction managers often face with projects containing multiple units wherein activities repeat from unit to unit. Therefore effective resource management is crucial in terms of project duration, cost and quality. Accordingly, researchers have developed several models to aid planners in developing practical and near-optimal schedules for repetitive projects. Despite their undeniable benefits, such models lack the ability of pure simultaneous optimization because existing methodologies optimize the schedule with respect to a single factor, to achieve minimum duration, total cost, resource work breaks or various combinations, respectively. This study introduces a novel approach called “opposition multiple objective symbiotic organisms search” (OMOSOS for scheduling repetitive projects. The proposed algorithm used an opposition-based learning technique for population initialization and for generation jumping. Further, this study integrated a scheduling module (M1 to determine all project objectives including time, cost, quality and interruption. The proposed algorithm was implemented on two application examples in order to demonstrate its capabilities in optimizing the scheduling of repetitive construction projects. The results indicate that the OMOSOS approach is a powerful optimization technique and can assist project managers in selecting appropriate plan for project. Keywords: Symbiotic organisms search, Multi-objective analysis, Resource tradeoff, Schedules, Repetitive

  15. GASB proposes new standards for financial reporting of postemployment benefits by state and local governments.

    Science.gov (United States)

    Johnson, Karl D

    2003-03-01

    GASB has proposed new standards that will affect the way in which governments report postemployment health care benefits in audited external financial statements, resulting in more complete and transparent reporting by employers and plans and more relevant and useful information for the users of governmental financial reports. This article provides an overview of current financial reporting standards and practice, the financial reporting objectives of the project, the proposed measurement approach, noteworthy specific proposals, and the projected timetable for completion of the project and implementation of the new standards.

  16. Work Breakdown Structure (WBS) Handbook

    Science.gov (United States)

    2010-01-01

    The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements. The WBS and WBS dictionary are effective management processes for planning, organizing, and administering NASA programs and projects. The guidance contained in this document is applicable to both in-house, NASA-led effort and contracted effort. It assists management teams from both entities in fulfilling necessary responsibilities for successful accomplishment of project cost, schedule, and technical goals. Benefits resulting from the use of an effective WBS include, but are not limited to: providing a basis for assigned project responsibilities, providing a basis for project schedule development, simplifying a project by dividing the total work scope into manageable units, and providing a common reference for all project communication.

  17. Experience with the Distance Learning Bachelor Study in the Field of Finance, Banking and Investment

    Directory of Open Access Journals (Sweden)

    Dana Palova

    2010-03-01

    Full Text Available Three years ago Faculty of Economics started the internal faculty project named “Preparation and realization of the distance learning bachelor study in the field of Finance, Banking and Investment”. Last year we reached the most important milestone – we got the first Bachelor graduates in August 2008. Based on the students’ feedback we extended the project objectives by preparation, implementation and realization of distance learning in engineer study program. One aim of the paper is to present current state of the mentioned project, to show the improved timetable of the particular phases of the mentioned project.

  18. Modelling in Evaluating a Working Life Project in Higher Education

    Science.gov (United States)

    Sarja, Anneli; Janhonen, Sirpa; Havukainen, Pirjo; Vesterinen, Anne

    2012-01-01

    This article describes an evaluation method based on collaboration between the higher education, a care home and university, in a R&D project. The aim of the project was to elaborate modelling as a tool of developmental evaluation for innovation and competence in project cooperation. The approach was based on activity theory. Modelling enabled a…

  19. Characteristics of the Process of Culture Development Project Activities (Culture of Social Engineering) at the Future Bachelors of Social Work

    Science.gov (United States)

    Nikitina, Natalya I.; Romanova, Elena Yu.; Vasilyeva, Tatyana V.; Nikishina, Irina N.; Grebennikova, Veronica M.

    2017-01-01

    In modern Russia professional activity productivity of social work specialist depends largely on his abilities and skills in the field of social design. University graduate's (social work bachelor`s) high level of professional-project activity culture can be regarded as one of the necessary conditions of successful labour market adaptation of…

  20. An investigation of strategies for integrated learning experiences ...

    African Journals Online (AJOL)

    Pre-determined and emergent codes based on grounded theory showed that it is possible to integrate theory with practice within one art subject by teaching theoretical work in the context of practical work, thus optimizing the limited time allocated to arts and culture education in school timetables. Keywords: arts; arts and ...

  1. STYLE - A European project on structural integrity: Progress of the work after 2 Years

    International Nuclear Information System (INIS)

    Heussner, Stefan; Nicak, Tomas; Keim, Elisabeth

    2012-01-01

    The purpose of this paper is to present the progress of the work on the EURATOM project STYLE (Structural integrity for lifetime management - non-RPV components). The project focuses on the structural integrity assessment of reactor coolant pressure boundary components (RCPB) relevant to ageing and life time management. The 4-years project started in January 2010 and is now in its third year. Within STYLE realistic failure models for some of the key components will be identified. The range of assessment tools considered will include those for assessment of component failure by advanced fracture mechanics analyses validated on small and large scale experiments, quantification of weld residual stresses by numerical analysis and by measurements, stress corrosion crack initiation and growth effects and assessment of RCPB components (excluding the reactor pressure vessel) under dynamic and seismic loading. Based on theoretical and experimental results, performance assessment and further development of simplified engineering assessment methods (EAM) will be carried out considering both deterministic and probabilistic approaches. Integrity assessment case studies and large scale demonstration experiments will be performed on Mock-ups of safety relevant components. These will include a repair weld in an aged butt-welded austenitic pipe, a dissimilar narrow gap TIG weld (following the EPR design) and a cladded ferritic pipe. Moreover, experiments on specimens and feature test pieces will be carried out to support the large scale Mock-up analyses. The end product of the project ('STYLE TOOLS') will comprise best practice guidelines on the use of advanced tools, on improvement and qualification of EAM as a part of European Leak-before-break (LBB) procedures and on life time management of the integrity of RCPB components in European nuclear power plants. The project is interacting with the European Network of Excellence NUGENIA (former NULIFE). (author)

  2. Evaluation of Project Achievements in VOMARE -project

    OpenAIRE

    Kokkarinen, Eeva

    2011-01-01

    The purpose of the thesis is to study the achievements of VOMARE –project from the Finnish Lifeboat Institutions perspective. The organisation is a roof organisation for voluntary maritime rescue operation in Finland. The Finnish Lifeboat Institution is a lead partner in VOMARE –project which is EU funded project and the aim of the project is to start voluntary rescue operations in Estonia. The theoretical part of the work is divided into two main categories; project management and planni...

  3. Promoting Safe Work for Young Workers: A Community-Based Approach. A Resource Guide Documenting the Experiences of Three Young Worker Projects.

    Science.gov (United States)

    Bush, Diane; Gonzalez-Arroyo, Michele; Stock, Laura; Delp, Linda; Miara, Christine; Dewey, Robin; Sinclair, Raymond C.; Ortega, Maria J.

    This guide presents the lessons learned from three health education projects that focused on young worker issues and were funded by the National Institute for Occupational Safety and Health. In these projects, occupational health educators worked for 3 years, in three different communities, to raise the awareness of young worker issues, including…

  4. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  5. DEVELOPMENT OF AN INSPECTION PLATFORM AND A SUITE OF SENSORS FOR ASSESSING CORROSION AND MECHANICAL DAMAGE ON UNPIGGABLE TRANSMISSION MAINS

    Energy Technology Data Exchange (ETDEWEB)

    George C. Vradis

    2003-07-01

    This development program is a joint effort among the Northeast Gas Association (formerly New York Gas Group), Foster-Miller, Inc., and the US Department of Energy (DOE) through the National Energy Technology Laboratory (NETL). The DOE's contribution to this project is $572,525 out of a total of $772,525. The present report summarizes the accomplishments of the project during its third three-month period (from April 2003 through June 2003). The project was initiated with delay in February 2003 due to contractual issues that emerged between NGA and Foster-Miller, Inc. The two organizations are working diligently to maintain the program's pace and expect to complete it in time. The efforts of the project focused during this period in finalizing the assessment of the tether technology, which is intended to be used as the means of communication between robot and operator. Results indicate that the tether is a viable option under certain pipeline operating conditions, but not all. Concerns also exist regarding the abrasion resistance of the tether, this issue being the last studied. Substantial work was also conducted on the design of the robotic platform, which has progressed very well. Finally, work on the MFL sensor, able to negotiate all pipeline obstacles (including plug valves), was initiated by PII following the successful completion of the subcontract negotiations between Foster-Miller and PII. The sensor design is at this point the critical path in the project's timetable.

  6. A Framework of Combining Case-Based Reasoning with a Work Breakdown Structure for Estimating the Cost of Online Course Production Projects

    Science.gov (United States)

    He, Wu

    2014-01-01

    Currently, a work breakdown structure (WBS) approach is used as the most common cost estimation approach for online course production projects. To improve the practice of cost estimation, this paper proposes a novel framework to estimate the cost for online course production projects using a case-based reasoning (CBR) technique and a WBS. A…

  7. Tackling the work-life balance challenge in Professional Service Firms: the impact of projects, organizing and service characteristics

    NARCIS (Netherlands)

    Noury, L.C.; Gand, Sébastien; Sardas, Jean-Claude

    2017-01-01

    Professional Service Firms (PSFs) are currently under considerable pressure for economic reasons (low growth, pressure on cost), but also from the emergence of individual demands for work-life balance (WLB) from professionals, which challenge traditional ways of organizing both projects and careers.

  8. Management of Teacher Scientific-Methodical Work in Vocational Educational Institutions on the Basis of Project-Target Approach

    Science.gov (United States)

    Shakuto, Elena A.; Dorozhkin, Evgenij M.; Kozlova, Anastasia A.

    2016-01-01

    The relevance of the subject under analysis is determined by the lack of theoretical development of the problem of management of teacher scientific-methodical work in vocational educational institutions based upon innovative approaches in the framework of project paradigm. The purpose of the article is to develop and test a science-based…

  9. A Collaborative Approach to Defining the Usefulness of Impact: Lessons from a Knowledge Exchange Project Involving Academics and Social Work Practitioners

    Science.gov (United States)

    Wilkinson, Heather; Gallagher, Michael; Smith, Mark

    2012-01-01

    This paper reports on a knowledge exchange project involving academics and practitioners in six local authority social work departments. It contributes to recent debates about the coproduction of knowledge, presenting findings in three key areas: the importance of relationships for knowledge exchange; "what works" for practitioners…

  10. Identification of promising Twin Hub networks : Report of Work Package 1 of the Intermodal rail freight Twin hub Network Northwest Europe - project (final report)

    NARCIS (Netherlands)

    Kreutzberger, E.D.; Konings, J.W.; Meijer, S.; Witteveen, C.; Meijers, B.M.; Pekin, E.; Macharis, C.; Kiel, J.; Kawabata, Y.; Vos, W.

    2014-01-01

    This report is the first deliverable of the project Intermodal Rail Freight Twin Hub Network Northwest Europe. We call its subject Twin hub network and the organisational entity to carry out the actions the Twin hub project. The project is funded by INTERREG NWE (programme IVb). Its work started in

  11. [Implementing population-based integrated care for a region: a work-in-progress report on the project "Gesundes Kinzigtal"].

    Science.gov (United States)

    Hildebrandt, Helmut; Schmitt, Gwendolyn; Roth, Monika; Stunder, Brigitte

    2011-01-01

    The regional integrated care model "Gesundes Kinzigtal" pursues the idea of integrated health care with special focus on increasing the health gain of the served population. Physicians (general practitioners) and psychotherapists, physiotherapists, hospitals, nursing services, non-profit associations, fitness centers, and health insurance companies work closely together with a regional management company and its programs on prevention and care coordination and enhancement. The 10 year-project is run by a company that was founded by the physician network "MQNK" and "OptiMedis AG", a corporation with public health background specialising in integrated health care. The aim of this project is to enhance prevention and quality of health care for a whole region in a sustainable way, and to decrease costs of care. The article describes the special funding model of the project, the engagement of patients, and the different health and prevention programmes. The programmes and projects are developed, implemented, and evaluated by multidisciplinary teams. Copyright © 2011. Published by Elsevier GmbH.

  12. Analisis Kecelakaan Kerja Pada Proyek Bangunan Gedung (Analysis of Work Accident on Building Construction Projects)

    OpenAIRE

    Ferdiansyah, Deni; Winarno, Setya; M, Faisol A

    2009-01-01

    Work accidents and fatalities often happen in construction industry, thus a study on this matter to promote safety management needs a thorough analysis of their elements. The purpose of this paper is to identify various types of accidents, cost of accident and insurance premium, and also the correlation between the types of accidents and their costs. The data was collected from thirty construction projects around Daerah Istimewa Yogyakarta province and surrounding areas. These data included t...

  13. Site observational work plan for the UMTRA Project site at Riverton, Wyoming

    International Nuclear Information System (INIS)

    1994-09-01

    The site observational work plan (SOWP) for the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the first document for the UMTRA Ground Water Project to address site-specific activities to meet compliance with the U.S. Environmental Protection Agency (EPA) proposed ground water standards (52 FR 36000 (1987)). In support of the activities the regulatory framework and drivers are presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. A combination of the two compliance strategies that will be recommended for this site are no remediation with the application of alternate concentration levels (ACL) and natural flushing in conjunction with institutional controls. ACLs are to be applied to constituents that occur at concentrations above background levels but which are essential nutrients and occur within nutritional ranges and/or have very low toxicity and high dietary intake rates compared to the levels detected in the ground water. The essential premise of natural flushing is that ground water movement and natural attenuation processes will reduce the detected contamination to background levels within 1 00 years. These two recommended compliance strategies were evaluated by applying Riverton site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement. There are three aquifers beneath the site: a surficial unconfined aquifer, a middle semiconfined aquifer, and a deeper confined aquifer. The milling-related contamination at the site has affected both the surficial and semiconfined aquifers, although the leaky shale aquifers separating these units limits the downward migration of contamination into the semiconfined aquifer. A shale aquitard separates the semiconfined aquifer from the underlying confined aquifer which has not been contaminated by milling-related constituents

  14. Photovoltaic Programme, Edition 2006. Summary report. Project list. Annual project reports 2005 (abstracts)

    Energy Technology Data Exchange (ETDEWEB)

    Nowak, S.

    2006-07-01

    This comprehensive, illustrated report for the Swiss Federal Office of Energy (SFOE) presents an overview of the work done as part of the 2005 research programme, along with the abstracts of the annual reports of the project leaders on research projects. It presents the programme's main points of focus, discusses the work done and the results obtained. Areas covered include cell technology (13 reports), solar modules and building integration (3 reports) , system technology (4 reports) as well as various further projects (5) that are connected with photovoltaics. Four further reports concern international co-operation. Further, several pilot and demonstration (P+D) projects are discussed. Lists of all research and development projects and pilot and demonstration projects are supplied. Work done at several institutions in Switzerland and at leading commercial companies is described.

  15. Project SEED. What Works Clearinghouse Intervention Report

    Science.gov (United States)

    What Works Clearinghouse, 2012

    2012-01-01

    "Project SEED" is a supplemental mathematics program for low-achieving students in grades 3 through 8 and is intended to prepare students to be successful in high school and college math. Based on the Socratic method, instruction is delivered through a series of questions to the class. In addition to individual responses, the instructor…

  16. Impact of Project Leadership Facets on Project Outcome

    Directory of Open Access Journals (Sweden)

    Arslan Ayub

    2015-08-01

    Full Text Available The study analyzes the role of project leadership facets on effective project outcome. Numerous such initiatives have already been taken on project outcome/performance in the context of apposite leadership styles or project management. However, the current study is unique in the milieu of project outcome that it introduces a new leadership approach, which throws light on the significance of variant leadership facets on project outcome. The study uses explanatory approach; primary data is collected from project management professionals working in different project organizations. The study uses structural equation model (SEM technique to test the hypothesis. The study found a positive relationship between project leadership facets and project outcome.

  17. The Role of Research in School Project Work and Teacher Development: Results from Project "Schools Ethics Technology."

    Science.gov (United States)

    Wellensiek, Anneliese; Lembens, Anja; Schallies, Michael

    "Schools Ethics Technology" was a German interdisciplinary research project with the Centre of Ethics in the Sciences at the University of Tubingen. The project highlighted the new topic of biotechnology and genetic engineering, involving the formation of active project groups within schools. This study examined teaching activities…

  18. WLCG and IPv6 - the HEPiX IPv6 working group

    Science.gov (United States)

    Campana, S.; Chadwick, K.; Chen, G.; Chudoba, J.; Clarke, P.; Eliáš, M.; Elwell, A.; Fayer, S.; Finnern, T.; Goossens, L.; Grigoras, C.; Hoeft, B.; Kelsey, D. P.; Kouba, T.; López Muñoz, F.; Martelli, E.; Mitchell, M.; Nairz, A.; Ohrenberg, K.; Pfeiffer, A.; Prelz, F.; Qi, F.; Rand, D.; Reale, M.; Rozsa, S.; Sciaba, A.; Voicu, R.; Walker, C. J.; Wildish, T.

    2014-06-01

    The HEPiX (http://www.hepix.org) IPv6 Working Group has been investigating the many issues which feed into the decision on the timetable for the use of IPv6 (http://www.ietf.org/rfc/rfc2460.txt) networking protocols in High Energy Physics (HEP) Computing, in particular in the Worldwide Large Hadron Collider (LHC) Computing Grid (WLCG). RIPE NCC, the European Regional Internet Registry (RIR), ran out ofIPv4 addresses in September 2012. The North and South America RIRs are expected to run out soon. In recent months it has become more clear that some WLCG sites, including CERN, are running short of IPv4 address space, now without the possibility of applying for more. This has increased the urgency for the switch-on of dual-stack IPv4/IPv6 on all outward facing WLCG services to allow for the eventual support of IPv6-only clients. The activities of the group include the analysis and testing of the readiness for IPv6 and the performance of many required components, including the applications, middleware, management and monitoring tools essential for HEP computing. Many WLCG Tier 1/2 sites are participants in the group's distributed IPv6 testbed and the major LHC experiment collaborations are engaged in the testing. We are constructing a group web/wiki which will contain useful information on the IPv6 readiness of the various software components and a knowledge base (http://hepix-ipv6.web.cern.ch/knowledge-base). This paper describes the work done by the working group and its future plans.

  19. protection against radon at home and at work; recommendations of the Israel national advisory committee on radiation protection and their practical implementation

    International Nuclear Information System (INIS)

    Schlesinger, T.; Margaliot, M.

    1997-01-01

    Existing legislation in Israel related to protection of the worker and the public from ionizing radiation excludes certain natural radiation sources from control by national authorities. Among these sources are radon and radon daughters. Employers are not required, by law to intervene in order to reduce radon levels in the working place, even when these levels exceed the action levels recommended by the ICRP or by the International Basic Safety Standards for protection Against Ionizing radiation. The Israel National Advisory Committee for radiation protection - INACRP (appointed by the Minister of the Environment and the Minister of Health) recommended, in 1993, to rectify this lack and proposed that the above two ministers issue guidelines for protecting the public and the worker from hazards of radon and radon daughters. The proposed guidelines are based on recent 1993 recommendations of the ICRP related to Radon at Home and at Work.The guidelines establish activity concentration levels, in homes and at work premises, above which remedial actions are recommended, and specify a time-table for these actions, depending on the extent to which the activity concentrations in the building exceed the remedial action levels specified. (authors)

  20. Site observational work plan for the UMTRA project site at Shiprock, New Mexico

    International Nuclear Information System (INIS)

    1994-09-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the initial document for developing site-specific activities to achieve regulatory compliance in the UMTRA Ground Water Project. The regulatory framework used to select the proposed ground water compliance strategies is presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. The Shiprock site consists of two, interconnected hydrogeologic systems: the terrace system and the floodplain system. Separate compliance strategies are proposed for these two systems. The compliance strategy for the terrace aquifer is no remediation with the application of supplemental standards based on classification of the terrace aquifer as having Class III (limited-use) ground water. The compliance strategy for the floodplain aquifer is active remediation using a subsurface biological barrier. These strategies were selected by applying site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement (PEIS) (DOE, 1994a). The site conceptual model indicates that milling-related contamination has impacted the ground water in the terrace and floodplain aquifers. Ground water occurs in both aquifers in alluvium and in fractures in the underlying Cretaceous age Mancos Shale. A mound of ground water related to fluids from the milling operations is thought to exist in the terrace aquifer below the area where settling ponds were in use during the mill operations. Most of the water occurring in the floodplain aquifer is from recharge from the San Juan River

  1. Canons and Heroes: The Reception of the Complete Works Translation Project in Finland, 2002-13

    Directory of Open Access Journals (Sweden)

    Keinänen Nely

    2017-12-01

    Full Text Available This essay examines the reception of the ten-year Complete Works translation project undertaken by the Finnish publishing company Werner Söderström Oy (WSOY in 2004-13. Focusing on reviews published in the first and last years of the project, the essay details ongoing processes of Shakespeare (re-canonization in Finland, as each new generation explains to itself what Shakespeare means to them, and why it continues to read, translate and perform Shakespeare. These processes are visible in comments from the series editors and translators extolling the importance of Shakespeare’s work and the necessity of creating new, modern translations so Finns can read Shakespeare in their mother tongue; in discussions of the literary qualities of a good Shakespeare translation, e.g. whether it is advisable to use iambic pentameter in Finnish, a trochaic language; and in the creation of publisher and translator “heroes,” who at significant cost to themselves, whether in money in terms of the publisher, or time and effort in terms of the translators, labour to provide the public with their Shakespeare in modern Finnish. While on the whole reviewers celebrated the new translations, there was some resistance to changes in familiar lines from older translations, such as Macbeth’s “tomorrow” speech, suggesting that there are nevertheless some limits on modernizing “classic” translations.

  2. Statement of work for the immobilized high-level waste transportation system, Project W-464

    Energy Technology Data Exchange (ETDEWEB)

    Mouette, P.

    1998-06-24

    The objective of this Statement of Work (SOW) is to present the scope, the deliverables, the organization, the technical and schedule expectations for the development of a Package Design Criteria (PDC), cost and schedule estimate for the acquisition of a transportation system for the Immobilized High-Level Waste (IHLW). This transportation system which includes the truck, the trailer, and a shielded cask will be used for on-site transportation of the IHLW canisters from the private vendor vitrification facility to the Hanford Site interim storage facility, i.e., vaults 2 and 3 of the Canister Storage Building (CSB). This Statement of Work asks Waste Management Federal Services, Inc., Northwest Operations, to provide Project W-464 with a Design Criteria Document, plus a life-cycle schedule and cost estimate for the acquisition of a transportation system (shielded cask, truck, trailer) for IHLW on-site transportation.

  3. The supervisor in the project-organized group work should participate in developing the students' project competencies

    DEFF Research Database (Denmark)

    Hansen, Søren

    2004-01-01

    The article demonstrates how the supervisor can facilitate development of competencies as an implicit part of supervising study projects.......The article demonstrates how the supervisor can facilitate development of competencies as an implicit part of supervising study projects....

  4. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  5. Non-Profit/Higher Education Project Management Series: The Project Plan

    Science.gov (United States)

    Burgher, Karl E.; Snyder, Michael

    2012-01-01

    This is the second installment of the AACRAO management series focusing on project management in the academy. In this article, the authors focus on white papers (often called charters, briefs, or fact sheets) and their partner, the work plan. The work plan is a detailed document that defines each aspect of a project. It is often preceded by a…

  6. Quality of Work and Team- and Project Based Work Practices in Engineering

    DEFF Research Database (Denmark)

    Buch, Anders; Andersen, Vibeke

    2015-01-01

    It is the aim of this paper to investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals and eventually their quality of work. The paper investigates how professional engineering...... ractices are enacted in two engineering consultancy companies in Denmark where ‘teamwork’ has been or is an ideal for organizing work....

  7. Safety at Work : Research Methodology

    NARCIS (Netherlands)

    Beurden, van K. (Karin); Boer, de J. (Johannes); Brinks, G. (Ger); Goering-Zaburnenko, T. (Tatiana); Houten, van Y. (Ynze); Teeuw, W. (Wouter)

    2012-01-01

    In this document, we provide the methodological background for the Safety atWork project. This document combines several project deliverables as defined inthe overall project plan: validation techniques and methods (D5.1.1), performanceindicators for safety at work (D5.1.2), personal protection

  8. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  9. Reflexive project management in high-abition projects

    NARCIS (Netherlands)

    Loeber, Anne; Vermeulen, T.

    2016-01-01

    Purpose
    The Aristotelian notion of phronèsis inspired innovative work in the realm of project management as well as in literature on sustainability and societal transformations. We argue that both literatures may benefit from a dialogue between the two, especially in view of outlining project

  10. NASA Work Breakdown Structure (WBS) Handbook

    Science.gov (United States)

    Terrell, Stefanie M.

    2018-01-01

    The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements.

  11. Project structure plan requirements for the deconstruction projects

    International Nuclear Information System (INIS)

    Petrasch, Peter; Schmitt, Christian; Stapf, Meike

    2011-01-01

    The deconstruction of nuclear facilities requires due to the particular conditions and the size of the project a special project planning. The authors analyze the possible requirements to be fulfilled by a project structure plan for nuclear facilities, including personnel resources, organization structure, budget questions, operation and project oriented measures, possibility of modifications and supplements. Further topics include controlling and project realization procedures, documentation, third party activities (authorities, consultants, surveyors), logistics and transport, and radiation protection issues. Several questions remain for plants-specific planning, including the integration of the plant personnel, administrative work, project management, economic and financial issues, radioactive waste management issues.

  12. Nuclear safety project

    International Nuclear Information System (INIS)

    1982-06-01

    The Annual Report 1981 is a detailed description (in German language) of work within the Nuclear Safety Project performed in 1981 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on - work completed - results obtained - plans for future work. This report was compiled by the project management. (orig.) [de

  13. 75 FR 2463 - Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers...

    Science.gov (United States)

    2010-01-15

    ... be considered a breach of contract and shall not entitle the Contractor to a price adjustment under... constitute a breach of this contract and shall not entitle the Contractor to any price adjustment under the... Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers Clauses...

  14. Statements of work for FY 1996 to 2001 for the Hanford Low-Level Tank Waste Performance Assessment Project

    International Nuclear Information System (INIS)

    Mann, F.M.

    1995-01-01

    The statements of work for each activity and task of the Hanford Low-Level Tank Waste Performance Assessment project are given for the fiscal years 1996 through 2001. The end product of this program is approval of a final performance assessment by the Department of Energy in the year 2000

  15. 6 Project-Management Tips

    Science.gov (United States)

    Demski, Jennifer

    2012-01-01

    When it comes to project management, the IT department is typically its own worst enemy. When project requests are pushed through the budgeting process by different departments, it's up to IT to make them all work. The staff is required to be "heroic" to get the project load done. People get to work over weekends and postpone their vacations. The…

  16. Growth Enterprise Board on Track

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    @@ In Premier Wen Jiabao's Government Work Report to the NPC,he said,"China will establish a stock market for high growth enterprises this year,accelerate development of the bond market and steadily develop the futures market."But he didn't layout a fixed timetable.

  17. Report of investigation into allegations of retaliation for raising safety and quality of work issues regarding Argonne National Laboratory's Integral Fast Reactor project

    International Nuclear Information System (INIS)

    1991-12-01

    In August 1990 James A. Smith resigned his position as an experimenter at Argonne National Laboratory-West (ANL-W), located near Idaho Falls, Idaho. Smith who holds a Ph.D. in metallurgy, had worked at the Laboratory since 1988, primarily on its Integral Fast Reactor (IFR) project. He alleged that the quality of the Laboratory's work on that project had been undermined by fundamental errors in metallurgy and related sciences, at least some of which had nuclear safety implications; that the Laboratory had published false and misleading accounts of its work; that prevailing attitudes at the Laboratory were antithetical to quality scientific work; and that because he had expressed concerns about these matters his job was threatened by his managers. Evidence gathered during an investigation by the Department of Energy's Office of Nuclear Safety (NS) is presented and conclusions and recommendations are provided

  18. Site Observational Work Plan for the UMTRA project site at Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1995-02-01

    Ground water compliance for the Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Ambrosia Lake, New Mexico, site, is governed by the Uranium Mills Tailings Radiation Control Act (42 USC section 7901 et seq.) and the U.S. Environmental Protection Agency's Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR Part 192; 60 FR 2854). The EPA standards describe specific conditions for which the U.S. Department of Energy (DOE) may apply for supplemental standards for contaminated ground water rather than meeting background levels or numerical standards. To achieve compliance with Subpart A of the EPA standards the residual radioactive materials are currently being consolidated on the site by the DOE in a disposal cell, isolating them from direct human or ecological contact and further dispersion into the environment. Completion of the disposal cell is scheduled for early 1995. An environmental assessment and a Finding of No Significant Impact (FONSI) were completed in 1987. Concurrence with the UMTRA Surface Project Ambrosia Lake remedial action plan (RAP) was granted by the U.S. Nuclear Regulatory Commission (NRC) and state of New Mexico in 1990. The DOE deferred compliance with Subpart B of the EPA standards in the Surface Project RAP. This site observational work plan (SOWP) is the first document to address ground water compliance under Subpart B at the Ambrosia Lake site. The Ambrosia Lake UMTRA Project site is within the Grants Mineral Belt and was one of numerous uranium mills supplied by many local mines. Ground water contamination at the site occurred as a result of uranium mill operations. Contamination of ground water resulted from discharge of waste water, infiltration of water through the tailings pile, hydraulic placement of mill tailings in nearby mines, and water pumped from mine shafts

  19. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  20. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    Science.gov (United States)

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  1. Site observational work plan for the UMTRA project site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1996-01-01

    This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer

  2. WLCG and IPv6 – the HEPiX IPv6 working group

    International Nuclear Information System (INIS)

    Campana, S; Elwell, A; Goossens, L; Grigoras, C; Martelli, E; Nairz, A; Pfeiffer, A; Chadwick, K; Chen, G; Chudoba, J; Eliáš, M; Kouba, T; Clarke, P; Fayer, S; Finnern, T; Ohrenberg, K; Hoeft, B; Kelsey, D P; Muñoz, F López; Mitchell, M

    2014-01-01

    The HEPiX (http://www.hepix.org) IPv6 Working Group has been investigating the many issues which feed into the decision on the timetable for the use of IPv6 (http://www.ietf.org/rfc/rfc2460.txt) networking protocols in High Energy Physics (HEP) Computing, in particular in the Worldwide Large Hadron Collider (LHC) Computing Grid (WLCG). RIPE NCC, the European Regional Internet Registry (RIR), ran out ofIPv4 addresses in September 2012. The North and South America RIRs are expected to run out soon. In recent months it has become more clear that some WLCG sites, including CERN, are running short of IPv4 address space, now without the possibility of applying for more. This has increased the urgency for the switch-on of dual-stack IPv4/IPv6 on all outward facing WLCG services to allow for the eventual support of IPv6-only clients. The activities of the group include the analysis and testing of the readiness for IPv6 and the performance of many required components, including the applications, middleware, management and monitoring tools essential for HEP computing. Many WLCG Tier 1/2 sites are participants in the group's distributed IPv6 testbed and the major LHC experiment collaborations are engaged in the testing. We are constructing a group web/wiki which will contain useful information on the IPv6 readiness of the various software components and a knowledge base (http://hepix-ipv6.web.cern.ch/knowledge-base). This paper describes the work done by the working group and its future plans.

  3. The TRAIN-project: railway safety and the train driver information environment and work situation. A summary of the main results

    Energy Technology Data Exchange (ETDEWEB)

    Kecklund, L. [MTO Psychology and Swedish National Rail Administration (Sweden); Ingre, M.; Kecklund, G.; Soederstroem, M.; Aakerstedt, T. [National Inst. for Psychosocial Factors and Health (Sweden); Lindberg, E. [Swedish National Rail Administration (Sweden); Jansson, A.; Olsson, E.; Sandblad, B. [Uppsala Univ. (Sweden). Dept. of Human-Computer Interaction; Almqvist, P. [Swedish State Railways (Sweden)

    2001-07-01

    The TRAIN project investigates traffic safety related risks, focusing in particular on the train driver work situation, use of information but also on the supporting safety organisation. It is an on-going project funded and managed by Swedish National Rail Administration and carried out by independent researchers. The project provides a multi-disciplinary investigation by use of a man-technology-organisation (MTO) perspective. Activities performed are task analysis, evaluation of the drivers use of information and interaction with the ATP system as well as analyses of stress, mental workload and work hours. Several methods are being used such as interviews, questionnaires, diaries, activity monitoring and videotapes. This paper gives an overview of the project as well as a short summary of the main results. Detailed results are presented in separate reports as started in the reference list. Some of the main results are that the drivers report severe problems concerning sleepiness on early morning shifts, problems with maintenance on vehicles, lack of information supporting the planning task as well as problems in understanding ATP functions. Two groups of drivers having a feed-back related as opposed to a feed-forward driving style could be identified. In conclusion there is a great need to perform more scientific studies of human factors and railway safety as well as to implement safety management programs including professional human factors competence in the railway industries. (orig.)

  4. Estimating railway infrastructure project cost from transferring nominal price to real price by considering the working time possessions

    DEFF Research Database (Denmark)

    Li, Rui; Landex, Alex; Salling, Kim Bang

    are varying depending on the working time possessions presented through the closure of the railway line. The effective working hours, type of construction work and construction speed are used as constraints to ensure the track closure plan remains feasible. To demonstrate the approach a Danish railway...... and 2) railway construction work costs are not transparent in the market. This paper suggests separating the costs into 3 sub-categories: materials, labour and machinery. Evidently, the materials are further broke-down into subcomponents which then remains fixed whereas the cost of labour and machinery...... construction project, the new line to the fixed link across Fehmarn Belt, is introduced where it is shown that the non-material cost is about 19% of the total expenditure. By assuming three sets of track blocking scenarios with the same amount of construction works it is proven that given an optimal track...

  5. Early awareness of emerging risks associated with food and feed production: Synopsis of pertinent work carried out within the SAFE FOODS project

    NARCIS (Netherlands)

    Marvin, H.J.P.; Kleter, G.A.

    2009-01-01

    This introduction to the journal¿s supplement on emerging food and feed safety issues summarizes the objectives and activities of the EU-funded SAFE FOODS project in general and its work package focusing on the early identification of emerging food safety risks, in particular. Within this work

  6. Project network-oriented materials management policy for complex projects

    DEFF Research Database (Denmark)

    Dixit, Vijaya; Srivastava, Rajiv K; Chaudhuri, Atanu

    2015-01-01

    This work devises a materials management policy integrated with project network characteristics of complex projects. It proposes a relative quantitative measure, overall criticality (OC), for prioritisation of items based on penalty incurred due to their non-availability. In complex projects...... managerial tacit knowledge which provides them enough flexibility to provide information in real form. Computed OC values can be used for items prioritisation and as shortage cost coefficient in inventory models. The revised materials management policy was applied to a shipbuilding project. OC values were......, practicing managers find it difficult to measure OC of items because of the subjective factors and intractable nature of penalties involved. However, using their experience, they can linguistically identify the antecedents and relate them to consequent OC. This work adopts Fuzzy Set Theory to capture...

  7. Nuclear safety project

    International Nuclear Information System (INIS)

    1984-11-01

    The semiannual progress report 1984/1 is a description of work within the Nuclear Safety Project performed in the first six month of 1984 in the nuclear safety field by KfK institutes and departements and by external institutions on behalf of KfK. The chosen kind of this report is that of short summaries, containing the topics work performed, results obtained and plans for future work. This report was compiled by the project management. (orig./RW) [de

  8. Project Nuclear Safety

    International Nuclear Information System (INIS)

    1981-11-01

    The semiannual progress report 1981/1 is a description of work within the Nuclear Safety Project performed in the first six month of 1981 in the nuclear safety field by KfK institutes and departments and by external institutions on behalf of KfK. The chosen kind of this report is that of short summaries, containing the topics, work performed, results obtained, plans for future work. This report was compiled by the project management. (orig.) [de

  9. CEC project Mirage - second phase on migration of radionuclides in the geosphere. Third (and final) summary progress report (work period 1989)

    International Nuclear Information System (INIS)

    Come, B.

    1990-01-01

    A second phase of the Community coordinated project Mirage (migration of radionuclides in the geosphere) was launched in 1986. The present report brings together reviews of work done in the four research areas of this phase for 1989, and therefore constitutes an update of the previous reports, ref. EUR 11589 and 12229. This project is part of the CEC R and D programme on radioactive waste management (1985-89)

  10. A critical Social Work project

    Directory of Open Access Journals (Sweden)

    Carlos Montaño

    2006-04-01

    Full Text Available Contemporary social transformations, operated by the neoliberal program under the command of financial capital, bring new challenges to the group of citizens and men and women who live by the sale of their labor power. Social workers, individually and collectively, are not separate from this reality. The profession was characterized by its confrontation with these challenges and its questioning and analysis of its role in society, in its attempt to assume more critical profiles and commitments to the interests of workers and the subaltern sectors. An example of this is the “Reconceptualization Movement” and the later attempt to define na “Alternative Social Service” concerned with the meaning of its practice, with the process of critical knowledge, with a criticism of capitalism and its situations of social injustice. The current challenges include overcoming earlier weaknesses, collectively constructing an ethicalpolitical professional project that can competently and committedly confront, at the heart of progressive social forces, the conditions in which workers live (with or without employment as well as other subaltern populations.

  11. Modelo PBL en la docencia universitaria de la didáctica de la lengua inglesa / Project Based Learning applied to the teaching of didactics of English language

    Directory of Open Access Journals (Sweden)

    María Asunción Barreras

    2017-01-01

    Full Text Available Resumen Project Based Learning es una aproximación educativa en la que un problema planteado a los alumnos sirve de contexto y estímulo para el aprendizaje. Este artículo plantea su aplicación en la asignatura de didáctica de las lenguas extranjeras del grado de Educación Primaria. Se explicarán las características más importantes de este método para poder entender su aplicación en la asignatura de didáctica y se contextualizará el proyecto en la asignatura y en el grado. La propuesta de este proyecto es una situación realista y el alumno universitario debe dar una respuesta correcta a dicha situación. También se explicará la temporalización del proyecto en la asignatura, sus objetivos, desarrollo del trabajo de los alumnos universitarios por grupos y evaluación del proyecto. Finalmente, se comprobará la versatilidad que esta metodología tiene en la docencia de la didáctica de las lenguas extranjeras, su importancia en el espacio europeo de educación superior y su relación con las herramientas de la Web 2.0. Abstract Project Based Learning is a method based on problem solving as a stimulus for the student to get involved in his process of learning. This paper explains how this method is applied to the subject “didactics of foreign languages” in the Primary Education degree. The main characteristics of this method are exposed so as to understand its application, which is also contextualized both in the subject and the degree. So there is information about timetable of the project in the subject as well as objectives, development of the student groups’ work and assessment. Finally, the reader will know about the versatility of this method in the subject “didactics of foreign languages”, its importance in the European higher education area and its relationship with Web 2.0 tools.

  12. Report about drilling works made in 13 Anomaly de Taylor and in the N- NE of its, around Fraile Muerto (Cerro Largo district): Uranium project

    International Nuclear Information System (INIS)

    Massa, J; Pirelli, H.

    1983-01-01

    The perforations were carried out to investigate in depth denominated anomaly 13 detected during the Taylor Mission (1975) and extended the punch area of study during you are suitable DINAMIGE-BRGM (Project the present report details the activities realised in the environs Fraile Muerto (Cerro Largo district) by the command team of perforations of the uranium project. Previously and contemporarily to the executed works, prospection became geophysical ground geochemistry geology and, works. (Uranium)

  13. Tank waste remediation system privatization Phase 1 infrastructure, project W-519, project execution plan

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented

  14. B827 Chemical Synthhesis Project - Industrial Control System Integration - Statement of Work & Specification with Attachments 1-14

    Energy Technology Data Exchange (ETDEWEB)

    Wade, F. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-04-21

    The Chemical Synthesis Pilot Process at the Lawrence Livermore National Laboratory (LLNL) Site 300 827 Complex will be used to synthesize small quantities of material to support research and development. The project will modernize and increase current capabilities for chemical synthesis at LLNL. The primary objective of this project is the conversion of a non-automated hands-on process to a remoteoperation process, while providing enhanced batch process step control, stored recipe-specific parameter sets, process variable visibility, monitoring, alarm and warning handling, and comprehensive batch record data logging. This Statement of Work and Specification provides the industrial-grade process control requirements for the chemical synthesis batching control system, hereafter referred to as the “Control System” to be delivered by the System Integrator.

  15. The greenGain project - Biomass from landscape conservation and maintenance work for renewable energy production in the EU

    Science.gov (United States)

    Clalüna, Aline; Baumgarten, Wibke; García Galindo, Daniel; Lenz, Klaus; Doležal, Jan; De Filippi, Federico; Lorenzo, Joaquín; Montagnoli, Louis

    2017-04-01

    The project greenGain is looking for solutions to increase the energy production with regional and local biomass from landscape conservation and maintenance work, which is performed in the public interest. The relevant resources analysed in the greenGain model regions are, among others, biomass residues from clearing invasive vegetation in marginal agricultural lands in Spain, and residues from abandoned vineyards and olive groves in landscape protected areas in Italy. The main target groups are regional and local players who are responsible for maintenance and conservation work and for the biomass residue management in their regions. Moreover, the focus will be on service providers - including farmers and forest owners, their associations, NGOs, energy providers and consumers. Local companies, municipalities and public authorities are collaborating to identify the still underutilised non-food biomass resources and to discuss the way to integrate them into the local and regional biomass markets. Since the start of the three year project in January 2015, the partners from Italy, Spain, Czech Republic and Germany analysed, among other, the biomass feedstock potential coming from landscape maintenance work, and assessed various technological options to utilise this type of biomass. Further, political, legal and environmental aspects as well as awareness raising and public acceptance actions regarding the energetic use of biomass from public areas were assessed. greenGain also facilitates the exchange between model regions and other similar relevant players in the EU and shares examples of good practice. General guidelines will be prepared to guarantee a wide dissemination to other regions in the EU. Thus, the project shows how to build-up reliable knowledge on local availability of this feedstock and provides know-how concerning planning, harvesting, pre-treatment, storage and sustainable conversion pathways to a wide range of stakeholders in the EU.

  16. Nurse managers' challenges in project management.

    Science.gov (United States)

    Suhonen, Marjo; Paasivaara, Leena

    2011-11-01

    To analyse the challenges that nurse managers meet in project management. Project management done by nurse managers has a significant role in the success of projects conducted in work units. The data were collected by open interviews (n = 14). The participants were nurse managers, nurses and public health nurses. Data analysis was carried out using qualitative content analysis. The three main challenges nurse managers faced in project management in health-care work units were: (1) apathetic organization and management, (2) paralysed work community and (3) cooperation between individuals being discouraged. Nurse managers' challenges in project management can be viewed from the perspective of the following paradoxes: (1) keeping up projects-ensuring patient care, (2) enthusiastic management-effective management of daily work and (3) supporting the work of a multiprofessional team-leadership of individual employees. It is important for nurse managers to learn to relate these paradoxes to one another in a positive way. Further research is needed, focusing on nurse managers' ability to promote workplace spirituality, nurse managers' emotional intelligence and their enthusiasm in small projects. © 2011 Blackwell Publishing Ltd.

  17. Web application to access U.S. Army Corps of Engineers Civil Works and Restoration Projects information for the Rio Grande Basin, southern Colorado, New Mexico, and Texas

    Science.gov (United States)

    Archuleta, Christy-Ann M.; Eames, Deanna R.

    2009-01-01

    The Rio Grande Civil Works and Restoration Projects Web Application, developed by the U.S. Geological Survey in cooperation with the U.S. Army Corps of Engineers (USACE) Albuquerque District, is designed to provide publicly available information through the Internet about civil works and restoration projects in the Rio Grande Basin. Since 1942, USACE Albuquerque District responsibilities have included building facilities for the U.S. Army and U.S. Air Force, providing flood protection, supplying water for power and public recreation, participating in fire remediation, protecting and restoring wetlands and other natural resources, and supporting other government agencies with engineering, contracting, and project management services. In the process of conducting this vast array of engineering work, the need arose for easily tracking the locations of and providing information about projects to stakeholders and the public. This fact sheet introduces a Web application developed to enable users to visualize locations and search for information about USACE (and some other Federal, State, and local) projects in the Rio Grande Basin in southern Colorado, New Mexico, and Texas.

  18. Four Approaches to Project Evaluation

    DEFF Research Database (Denmark)

    Laursen, Markus; Svejvig, Per; Rode, Anna Le Gerstrøm

    . Each of the framework’s four approaches provides a distinct evaluation that sheds light on some issues while leaving others unattended. Following these lines, the paper calls for more multi-faceted project evaluations. Introducing a framework that can help analyze existing evaluations and structure......There are many theoretical and practical reasons for evaluating projects – including explorative arguments focusing on expanding descriptive knowledge on project work as well as normative arguments focusing on improving prescriptive models of project performance. Despite the need for project...... management methodologies that work and combat project failure, and research methods that can assess effective project management and methodologies, as well as empirical research on the actuality of projects as practice, evaluation research on projects including project management and methodologies is scarce...

  19. Causes of delays on Construction Projects in Kuwait according to opinion of engineers working in Kuwait

    OpenAIRE

    Naser S. Almutairi

    2016-01-01

    This paper presents an investigation into analysis of the causes of delays on Construction Projects in Kuwait according to opinion of engineers working in Kuwait. This is achieved through identification of the major causes of delays in the construction industry as reported in literature and using a questionnaire survey to collect the views of the various key players in the Kuwaiti construction industry. The data is analyzed and the views of the groups surveyed discussed and the relative impor...

  20. Natural Childbirth

    Science.gov (United States)

    ... through the pain is up to you. Different women find that different methods work best for them. Many can control the pain ... timetable when you're giving birth. For some women, the baby comes in a few hours; for many others it may take all day ( ...

  1. Flexible work hours, health and well-being in the European Union: preliminary data from a SALTSA project.

    Science.gov (United States)

    Costa, G; Akerstedt, T; Nachreiner, F; Baltieri, F; Folkard, S; Frings Dresen, M; Gadbois, C; Gartner, J; Grzech Sukalo, H; Harma, M; Kandolin, I; Silverio, J; Simoes, A

    2001-12-01

    Demand for flexible work hours (FWH) is increasing in Europe aimed at increasing the number of production hours on one hand, and, on the other, reducing individual working hours and/or increasing autonomy and control on them. In view of the lack of knowledge of the effects of FWH on health and safety, we started a pilot project, funded by the Joint Programme for Working Life Research in Europe (SALTSA), aimed at: a) comparing the most relevant national legislation and how the EU Directive 93/104 "concerning certain aspects of working time" has been implemented in the member States; b) reporting prevalence and trend of FWH in Europe according to the three EU Surveys on Working Conditions carried out in the last decade; c) collecting practical examples of innovative FWH; d) evaluating their impact on health and safety in relation to work sectors, job demands, social life, aging and gender. Consequent actions are going to include information and consultancy for pertinent authorities and social parties involved, as well as training programmes for Union officials and similar groups concerning the organisation of FWH according to ergonomic principles.

  2. 1986 progress report on R and D work of the Nuclear Fusion Project (PKF)

    International Nuclear Information System (INIS)

    Kast, G.

    1987-03-01

    The Kernforschungszentrum Karlsruhe (KfK) and the Max-Planck-Institute for Plasma Physics, Garching, have joined to form the Entwicklungsgemeinschaft Kernfusion, and under this roof perform research work on the physical and technical conditions and requirements of using the energy from nuclear fusion, and to plan the design and the construction of the necessary equipment for future large-scale experiments. The activities of the KfK for the development of fusion devices with magnetic confinement have been concentrated in the Nuclear Fusion Project, which cooperates in the European Fusion Technology Programme, on the basis of an association agreement between KfK and Euratom, supported by the European Commission. Supplementary KfK contributions, studies in most cases, create a connection between various fields of work, and prepare the road for new tasks, which in the years to come will be found in the extension of the Fusion Technology Programme and the planning work for NET. The reports collected in this annual survey are contributions from KfK Institutes of the year 1986. An annex presents the Easks taken over by KfK within the Fusion Technology Programme of the EC, and notes on the KfK Institutes taking part in the particular activities facilitate reference to the individual, full-text reports. (orig.) [de

  3. Business in Social Work Education: A Historically Black University's Social Work Entrepreneurship Project

    Science.gov (United States)

    Archibald, Paul; Muhammad, Omar; Estreet, Anthony

    2016-01-01

    The destabilization of the current economy has sparked increased interest in entrepreneurship, especially for underrepresented minority social work students. The entrepreneurial thinking of these social work students entering social work programs at historically Black colleges and universities needs to be fostered in a learning environment. This…

  4. Tkinter GUI application development blueprints build nine projects by working with widgets, geometry management, event handling, and more

    CERN Document Server

    Chaudhary, Bhaskar

    2018-01-01

    Tkinter is the built-in GUI package that comes with standard Python distributions. It is a cross-platform package, which means you build once and deploy everywhere. It is simple to use and intuitive in nature, making it suitable for learners. This book will enable you to use Tkinter effectively through working on nine versatile projects.

  5. The "Project": Putting Student Controlled, Small Group Work and Transferable Skills at the Core of a Geography Course.

    Science.gov (United States)

    Hindle, Brian Paul

    1993-01-01

    Describes how a cooperative group project has become a foundation of the first two years of a three-year program in college-level geography. Discusses the origin, development, and topic selection for each of the cohort groups working in the program. Asserts that the program has been favorably received by both students and faculty members. (CFR)

  6. The fifth research coordination meeting (RCM) on 'Updated codes and methods to reduce the calculational uncertainties of liquid metal fast reactors reactivity effects'. Working material

    International Nuclear Information System (INIS)

    2004-01-01

    The general objective of the CRP is to validate, verify and improve methodologies and computer codes used for the calculation of reactivity coefficients in fast reactors aiming at enhancing the utilization of plutonium and minor actinides. The objectives of the fifth RCM were: to review the progress achieved since the 4th RCM; to review and finalize the draft synthesis report on BN-600 MOX Fueled Core Benchmark Analysis (Phase 4); to compare the results of Phase 5 (BFS Benchmark Analysis); to agree on the work scope of Phase 6 (BN-Full MOX Minor Actinide Core Benchmark); to discuss the preparation of the final report. In this context, review and related discussions were made on the following items: summary review of Actions and results since the 4th RCM; finalization of the draft synthesis report on BN-600 full MOX-fueled core benchmark analysis (Phase 4); presentation of individual results for Phase 5 by Member States; preliminary inter-comparison analysis of the results for Phase 5; definition of the benchmark model and work scope to be performed for Phase 6; details of the work scope and future CRP timetable for preparing a final report

  7. Engineered barrier systems (EBS) in the context of the entire safety case

    International Nuclear Information System (INIS)

    2003-01-01

    A joint NEA-EC workshop entitled 'Engineered Barrier Systems (EBS) in the Context of the Entire Safety Case' was organised in Oxford on 25-27 September 2002 and hosted by United Kingdom Nirex Limited. The main objectives of the workshop were to provide a status report on engineered barrier systems in various national radioactive waste management programmes considering deep geological disposal; to establish the value to member countries of a project on EBS; and to define such a project's scope, timetable and modus operandi. This report presents the outcomes of this workshop. (author)

  8. Engineered Barrier Systems (EBS) in the Context of the Entire Safety Case

    International Nuclear Information System (INIS)

    2005-01-01

    A joint NEA-EC workshop entitled ''Engineered Barrier Systems (EBS) in the Context of the Entire Safety Case'' was organised in Oxford on 25-27 September 2002 and hosted by United Kingdom Nirex Limited. The main objectives of the workshop were to provide a status report on engineered barrier systems in various national radioactive waste management programmes considering deep geological disposal; to establish the value to member countries of a project on EBS; and to define such a project scope, timetable and modus operandi. This report presents the outcomes of this workshop. (author)

  9. A Balancing Act: A Quantitative Analysis of the Influence of Work/Life Balance and Work Atmosphere on Personal and Professional Success of Women Scientists

    Science.gov (United States)

    Archie, T.; Laursen, S. L.; Kogan, M.

    2012-12-01

    Despite an increase in advanced degrees awarded to women in the geosciences, scientific leaders in academia remain dominantly male. Women are underrepresented in tenure-track positions in Earth science departments at research universities and are less likely to have more senior positions within their academic institutions. Our empirical study analyzes factors that influence personal and professional success for women scientists. Prior research has shown that women are subjected to unintended and unrecognized biases that can have an ultimate impact on their productivity, advancement, and success. We used an electronic survey to collect data from 662 early-career geoscientists who are members of the Earth Science Women's Network and/or the network's Earth Science Jobs list. We asked respondents to self-report their perceptions of work/life balance, professional atmosphere and other variables indicative and/or predictive of personal and professional success. In a previous analysis (Kogan & Laursen, 2011) we found that women consistently rated the professional atmosphere in their departments and their interactions with colleagues less favorably than men. Women indicated lower rates of collaboration with colleagues in their unit compared to their male peers. We also found work/life balance is of particular concern to early-career scientists, especially since tenure clock and the biological clock function on similar timetables. Women reported more caregiving responsibilities than men, further complicating the balance between work and personal life. We hypothesize that the work life balance and professional atmosphere influences productivity, advancement, and career/job satisfaction. We now investigate how work/life balance, atmosphere within the work unit, and mentoring influence productivity, job and career satisfaction, and career advancement. We introduce a structural equation model that seeks to explain how these relationships vary dependent upon gender, career level

  10. Dependency Analysis Guidance. Nordic/German Working Group on Common cause Failure analysis. Phase 1 project report: Comparisons and application to test cases

    Energy Technology Data Exchange (ETDEWEB)

    Becker, Guenter (RISA Sicherheitsanalysen GmbH (DE)); Jaenkaelae, Kalle (Fortum Nuclear Services Oy (FI)); Johanson, Gunnar; Lindberg, Sandra (ES Konsult, Stockholm (SE)); Knochenhauer, Michael (Relcon Scandpower AB, Stockholm (SE)); Schubert, Bernd (Vattenfall Europe (DE)); Vaurio, Jussi (Prometh Solutions (FI)); Wohlstein, Ralf (E.ON Kernkraft, Maschinentechnik (DE))

    2007-10-15

    This report is part of the reporting from the European Working Group on CCF analysis (EWG), including members from Finland, Germany and Sweden. The project is planned in two phases with a reporting and progress evaluation before initiation of the second phase. Phase 1: Comparisons and application to test cases (2006). Phase 2: Development of harmonized approach and applications (2007). This report summarizes the work during the 1st phase of the project, which included the following main tasks: Task 1: Survey of databases, Task 2: Survey of methods for classification and quantification of CCF-events and description of these methods. Task 3: Classify events for application, using different approaches as recommended above. Task 4: Draw conclusions for harmonization

  11. Dependency Analysis Guidance. Nordic/German Working Group on Common cause Failure analysis. Phase 1 project report: Comparisons and application to test cases

    International Nuclear Information System (INIS)

    Becker, Guenter; Jaenkaelae, Kalle; Johanson, Gunnar; Lindberg, Sandra; Knochenhauer, Michael; Sc hubert, Bernd; Vaurio, Jussi; Wohlstei n, Ralf

    2007-10-01

    This report is part of the reporting from the European Working Group on CCF analysis (EWG), including members from Finland, Germany and Sweden. The project is planned in two phases with a reporting and progress evaluation before initiation of the second phase. Phase 1: Comparisons and application to test cases (2006). Phase 2: Development of harmonized approach and applications (2007). This report summarizes the work during the 1st phase of the project, which included the following main tasks: Task 1: Survey of databases, Task 2: Survey of methods for classification and quantification of CCF-events and description of these methods. Task 3: Classify events for application, using different approaches as recommended above. Task 4: Draw conclusions for harmonization

  12. On A Project Work for International Students Paired with Japanese Partners in a Summer Intensive Japanese Program for Science and Technology

    Science.gov (United States)

    Fudano, Hiroko

    A project work in which learners of a foreign language engage in a task with the native speakers is one of the effective ways to bring in ample real communication opportunities to a classroom. This scheme also gives both parties meaningful experiences for intercultural understanding. This paper reports a “Pythagoras” machine production project in which international students were paired up with Japanese students as a part of a Japanese for science and technology course in a summer intensive program. Based on the participants‧ course evaluation data, the paper also discusses the effectiveness of the project for Japanese language learning and for promoting intercultural understanding.

  13. UBERA-6 project: Achievements of 4 working years

    International Nuclear Information System (INIS)

    Blaumann, H; Fernandez, C; Dell Occhio, L; D Ovidio, C; Fabro, J; Miceli, M; Novara O; Perez, A; Taboada, H

    2009-01-01

    On May 2005 the President of CNEA created the UBERA-6 project, belonging to the former Technology and Environmental Management, with the aim to convert to Low Enriched Uranium (LEU) the RA-6 reactor core, to swap with the US Department of Energy (US-DoE) equivalent inventories of High Enriched Uranium (HEU) for LEU, to export to USA the spent HEU core and to recover and downblend to LEU remnant HEU inventories contained in fuel and irradiation target scraps. By means of two contracts signed by CNEA and US-DoE, acquisition of consumables and graphite reflectors, the fabrication of LEU core replacement, conditioning, transport and exportation of spent HEU core and subsequent supply of fresh LEU for fuel and irradiation targets used in our research reactors were costed. During July, 2006 468 HEU based fresh plates were exported to USA. On June 30th, 2007 the RA-6 reactor temporarily stopped working and its personnel remover the HEU core to the auxiliary pool. On November 7th the former spent HEU based core was exported to USA. During May and July, 2008 the new RA-6 reactor LEU based core and control assemblies were provided. During March, 2009 the RA-6 reactor became critical. For recovering and blending down of remnant HEU inventories, the Triple Height Laboratory (LTA) was refurbished. A Supplemental Agreement to one of the original contract between CNEA and US-DoE will financially support the refurbishment of the Radiochemical Facility Laboratory (LFR) and so reprocess irradiated HEU retained in radioisotope production filters to downblend into LEU, as well as the separation of the pair Sr90-Y90 and of Cs137 inventories for further application in Nuclear Medicine. [es

  14. The WPU Project

    DEFF Research Database (Denmark)

    Jensen, Janne Jul; Skov, Mikael B.; Stage, Jan

    2009-01-01

    The Web Portal Usability (WPU) project is working on usability engineering methods, which are important in the development of Web portals. These methods are tested with companies that design modern Web portals.......The Web Portal Usability (WPU) project is working on usability engineering methods, which are important in the development of Web portals. These methods are tested with companies that design modern Web portals....

  15. 34 CFR Appendix to Part 5 - Unknown Title

    Science.gov (United States)

    2010-07-01

    ..., proposed remedial or affirmative steps to be taken with goals and timetables, policies on recruitment... informational value of data contained therein. (3) Agency records do not include tangible, evidentiary objects... based on one or more of the following: the time and work necessary to process the FOIA request, the...

  16. Fabrication and installment of the hard-wired I and C works for the neutral beam injection test stand of the K-STAR project

    International Nuclear Information System (INIS)

    Jung, Ki Sok; Oh, Byung Hun

    2004-12-01

    Instrumentation and Control(I and C) of the neutral beam injection test stand (NBI-TS) for the K-STAR national fusion research project has been underway since the start of the project to answer the diverse requests arising from the various facets of the development and construction phases of the project. In a parallel effort with the software oriented I and C development, there has been existing an enormous amount of hard-wiring I and C works for the NBI facility to be developed and fabricated in schedule. Circuits and hardwired functions have been designed, tested, fabricated, and finally installed to the relevant parts of the system. Examples of those hard-wired I and C works are related to the vacuum system, gas feeding system, arc detector circuit, ion source monitoring, bending magnet and calorimeter. Another one to be mentioned is the interlock circuitry. One of the interlock circuits are related to the coolant flow failure. The other is the interlock circuit related to the vacuum failure. All of the above mentioned circuitry now constitutes integral parts for the proper operation of the NBI system; details of those hard-wired I and C work are described in this report

  17. Waste Contaminants at Military Bases Working Group report

    International Nuclear Information System (INIS)

    1993-01-01

    The Waste Contaminants at Military Bases Working Group has screened six prospective demonstration projects for consideration by the Federal Advisory Committee to Develop On-Site Innovative Technologies (DOIT). These projects include the Kirtland Air Force Base Demonstration Project, the March Air Force Base Demonstration Project, the McClellan Air Force Base Demonstration Project, the Williams Air Force Base Demonstration Project, and two demonstration projects under the Air Force Center for Environmental Excellence. A seventh project (Port Hueneme Naval Construction Battalion Center) was added to list of prospective demonstrations after the September 1993 Working Group Meeting. This demonstration project has not been screened by the working group. Two additional Air Force remediation programs are also under consideration and are described in Section 6 of this document. The following information on prospective demonstrations was collected by the Waste Contaminants at Military Bases Working Group to assist the DOIT Committee in making Phase 1 Demonstration Project recommendations. The remainder of this report is organized into seven sections: Work Group Charter's mission and vision; contamination problems, current technology limitations, and institutional and regulatory barriers to technology development and commercialization, and work force issues; screening process for initial Phase 1 demonstration technologies and sites; demonstration descriptions -- good matches;demonstration descriptions -- close matches; additional candidate demonstration projects; and next steps

  18. Reducing Cancer Health Disparities through Community Engagement: Working with Faith-Based Organizations (Project CHURCH) | Division of Cancer Prevention

    Science.gov (United States)

    Speaker | "Reducing Cancer Health Disparities through Community Engagement: Working with Faith-Based Organizations (Project CHURCH)" will be presented by Lorna H. McNeill, PhD, MPH, Chair of the Department of Health Disparities at the University of Texas MD Anderson Cancer Center in Houston, TX. Date: 2/20/2018; Time: 11:00am - 12:00pm; Location: NCI Shady Grove Campus,

  19. Improving quality through effective implementation of information technology in healthcare.

    Science.gov (United States)

    Øvretveit, John; Scott, Tim; Rundall, Thomas G; Shortell, Stephen M; Brommels, Mats

    2007-10-01

    To describe an implementation of one information technology system (electronic medical record, EMR) in one hospital, the perceived impact, the factors thought to help and hinder implementation and the success of the system and compare this with theories of effective IT implementation. To draw on previous research, empirical data from this study is used to develop IT implementation theory. Qualitative case study, replicating the methods and questions of a previously published USA EMR implementation study using semi-structured interviews and documentation. Large Swedish teaching hospital shortly after a merger of two hospital sites. Thirty senior clinicians, managers, project team members, doctors and nurses. The Swedish implementation was achieved within a year and for under half the budget, with a generally popular EMR which was thought to save time and improve the quality of patient care. Evidence from this study and findings from the more problematic USA implementation case suggests that key factors for cost effective implementation and operation were features of the system itself, the implementation process and the conditions under which the implementation was carried out. There is empirical support for the IT implementation theory developed in this study, which provides a sound basis for future research and successful implementation. Successful implementation of an EMR is likely with an intuitive system, requiring little training, already well developed for clinical work but allowing flexibility for development, where clinicians are involved in selection and in modification for their department needs and where a realistic timetable is made using an assessment of the change-capability of the organization. Once a system decision is made, the implementation should be driven by top and departmental leaders assisted by competent project teams involving information technology specialists and users. Corrections for unforeseen eventualities will be needed, especially

  20. Time-table of important events in connection with radioactive waste disposal

    International Nuclear Information System (INIS)

    1982-07-01

    This data compilation is a small manual in connection with the radioactive waste disposal of German nuclear power plants. The record begins December 12, 1951, when electric power from nuclear energy was first generated in the Arco Reactor in Idaho/USA, and is continued till July 20, 1982, when the government of the Land Hessen confirmed a previous decision selecting Wangershausen as the site for a projected reprocessing plant. (orig./HSCH) [de

  1. Report on research and development work 1985 on the nuclear fusion project. Annual report of the Association KfK-Euratom

    International Nuclear Information System (INIS)

    Finken, D.

    1986-05-01

    The Nuclear Research Centre Karlsruhe and the Max Planck Institute for Plasma Physics together form the Nuclear Fusion Development Association. The partners collaborate with the aim of creating the physical and technical preconditions for the use of the energy released by nuclear fusion and to plan and carry out future large-scale experiments. The work of the Nuclear Research Centre Karlsruhe on fusion with magnetic containment is included in the nuclear fusion project and is part of the European fusion technology programme. The work is supported by an association contract between KfK and Euratom by the European Commission. Connections are built up between areas of work and new projects are prepared by supplementary KfK contributions, mostly studies. This is done with regard to the expansion of the technology programme to be expected for future years and the planning activities for NET. The reports collected here are contributions of the KfK institutes in 1985. The appendix contains a list of the tasks which KfK has taken over from the fusion technology programme of the EEC. References to the institutes' contributions make the assignment of textual contributions easier. (orig.) [de

  2. Earned value project management

    CERN Document Server

    Fleming, Quentin W

    2010-01-01

    Organizations that follow the principles of good Earned Value Management (EVM) create an environment that allows teams to successfully operate and thrive ? even in the face of challenges that could negatively impact their projects. Earned Value Project Management (EVPM) is a methodology used to measure and communicate the real physical progress of a project taking into account the work completed, the time taken and the costs incurred to complete that work. As a result, EVPM allows more educated and effective management decision-making, which helps evaluate and control project risk by measuring project progress in monetary terms. In the first two editions of Earned Value Project Management, Quentin W. Fleming and Joel M. Koppelman provided guidance for project management practitioners already familiar with EVPM, was well as those who were new to the use of this technique. The third edition expanded the information available on of EVPM for medium and smaller projects while still being relevant for larger projec...

  3. Evaluation of the Self-Employment for Gecekondu Women Project, November 1995-June 1998. Working Papers in Early Childhood Development.

    Science.gov (United States)

    Aksoy, Asu; Schilen, Sandra; Ulgen, Tulu

    This paper stems from an evaluation of Turkey's first microcredit project aimed specifically at women, which was carried out with data derived through the Foundation for the Support of Women's Work (FFSW)'s Management Information System (which tracks credit users and repayment performance), application forms from women who applied for and received…

  4. Implementation of Work Package 7 (WP7) - a condition for achieving the CORONA project goals

    International Nuclear Information System (INIS)

    Tsakov, T.; Ilieva, M.; Miteva, R.

    2013-01-01

    Project CORONA 'Construction of a regional center for WWER competencies and nuclear technology' is a three year project co-funded by the European Commission coordinated by Kozloduy NPP and another 10 participants from eight countries. Work Package 7 (WP7) - 'Assessment and recommendations for sustainable development of regional Center for WWER nuclear technology and competence', aims to summarize and analyzing the results of the implementation of activities within the defined work packages: WP1 - Identification of training needs for all target groups; WP2 - Creating a scheme for training of nuclear scientists and researchers with the technology of WWER; WP3 - Create a schedule for training of non-nuclear specialists and subcontractors with the basics of technology WWER; WP4 - Establishing a scheme for specialized training of students with technology WWER; WP5 - Creation of a scheme for implementing and enhancing safety culture; WP6 - Creating a portal for knowledge management technology with WWER; Analysis of the results of the activity should provide conditions for creation of conditions for continued development of a regional center for obtaining and maintaining the knowledge of professionals applying WWER technology by integrating the experience of different organizations, research centers and the WWER units, in the process of creating frames for maintenance and development of this technology. By establishing the regional center will be unified schemes for qualification of personnel applying WWER technology in accordance with the standards of the International Atomic Energy Agency and the generally accepted criteria for education and vocational training in the European Community. Integrating the experience of different organizations NPP and research centers will enable to define schemes and programs for continuous education and training to be recognized in the EU from around the nuclear sector and the European Credit System for Vocational

  5. The Chernobyl reactor accident, ten years on. Teaching projects for mathematics instruction in interdisciplinary working groups

    International Nuclear Information System (INIS)

    Boer, H.; Delle, E.; Mies, K.; Warmeling, A.

    1996-01-01

    The booklet presents background information and addresses the following aspects: ionizing radiation and radiation effects; safety of German nuclear power plants; statistical evidence of radiation injuries; short-lived and long-lived ionizing radiation; radioactive waste; CO 2 emissions as an argument in favour of nuclear power generation. The material presented is intended for use by a school project team interested in the subjects, or as a basis for collaborative, interdisciplinary teaching in working groups, and it offers information and problems for mathematics teaching. (HP) [de

  6. Draft project management update to the Iowa DOT Project Development Manual : final report.

    Science.gov (United States)

    2016-08-01

    This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to : incorporate a greater focus on project management in their project development process. : A technical advisory committee (TAC) ...

  7. Project Soar.

    Science.gov (United States)

    Austin, Marion

    1982-01-01

    Project Soar, a Saturday enrichment program for gifted students (6-14 years old), allows students to work intensively in a single area of interest. Examples are cited of students' work in crewel embroidery, creative writing, and biochemistry. (CL)

  8. Y-STR analysis on DNA mixture samples--results of a collaborative project of the ENFSI DNA Working Group

    DEFF Research Database (Denmark)

    Parson, Walther; Niederstätter, Harald; Lindinger, Alexandra

    2008-01-01

    The ENFSI (European Network of Forensic Science Institutes) DNA Working Group undertook a collaborative project on Y-STR typing of DNA mixture samples that were centrally prepared and thoroughly tested prior to the shipment. Four commercial Y-STR typing kits (Y-Filer, Applied Biosystems, Foster C...... a laboratory-specific optimization process is indicated to reach a comparable sensitivity for the analysis of minute amounts of DNA....

  9. Investigating the experience of outdoor and adventurous project work in an educational setting using a self-determination framework

    OpenAIRE

    Sproule, J.; Martindale, R.; Wang, J.; Allison, P.; Nash, C.; Gray, S.

    2013-01-01

    The purpose of this study was to carry out a preliminary investigation to explore the use ofoutdoor and adventurous project work (PW) within an educational setting. Specifically, differencesbetween the PW and normal academic school experiences were examined using a selfdeterminationtheory framework integrated with a goal orientation and psychological skills perspective.Additionally, an exploratory investigation was carried out to examine the extent to which key motivation constructs predicted...

  10. Intended or unintended? Issues arising from the implementation of ...

    African Journals Online (AJOL)

    10% of their timetable to plan lessons, prepare resources and assess pupils' work. This raises issues of what 10% of their time, with pupils, teachers relinquish for PPA. One common solution in primary schools seems to have been to employ coaches (particularly football coaches) to teach Physical Education (PE) lessons.

  11. Plan to build lab in mine aims to strike scientific gold

    CERN Multimedia

    Mercer, B

    2004-01-01

    Article describing plans to build a neutrino research laboratory in the Homestake gold mine in South Dakota. Assuming that the funding comes through, the timetable calls for construction work inside the mine to start in 2006, with the first detector equipment for experiments installed from 2007 to 2009 (1 page).

  12. Wetlands Work

    Science.gov (United States)

    Messina, Linda; Blanchard, Pamela Borne

    2004-01-01

    This article describes how a biology teacher's search for a cross-curricular project in science, math, history, and environmental science, that would help her students connect what they were learning in the classroom to their everyday life, resulted in an ongoing stewardship project. Working together with the Louisiana Sea Grant College Program…

  13. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  14. PM of the Vuotos working group

    International Nuclear Information System (INIS)

    Ojala, J.; Oikarinen, S.

    1995-01-01

    In the program for the Finnish Government will study the premises of the Vuotos Basin Project in the light of the most recent environment studies. For this purpose the Ministry of Trade and Industry appointed a working group. The working group has studied the latest reports on the Vuotos Project which were available up to 30 9.1995. The working group also updated the projections of the energy significance of the project and how it would affect employment. The working group arrived at these conclusions: The Vuotos Project is still of energy economy significance because the need for domestic energy production capacity - and also capacity that can be regulated - is on the rise. The project will not cause any fatal diminishing of the abundance of any Finnish plant or animal species, but it will diminish the number of habitants for some threatened plants and birds. Thus it will diminish the diversity of Finnish nature and the possibilities to use the area for many purposes. The project will cause the weakening of water quality in the streams beneath the basin for the first few years. The project is important for employment reasons, because it will diminish unemployment during construction by 2-8 %-units, depending on the county, and it will make the creation of new jobs possible in the long run. The working group thinks that estimates of experts concerning the pros and cons of the project are quite different and that the final weighing of the considerable body of research and reports can best be made at the Water Court proceedings. (author)

  15. OECD: Halden reactor project

    International Nuclear Information System (INIS)

    1979-01-01

    The work at the Project has continued in the two main fields: test fuel irradiation and fuel research, and computer based process supervision and control. Organizations participating in the Project continue to have their fuel irradiated in the Halden Reactor in instrumented test assemblies designed and manufactured by the Project. The Project's fuel studies continue to focus on specific subjects such as fuel pellet/cladding interaction and heat transfer, fission product release and fuel behavior under loss of coolant conditions. The work on process control and supervision continues in the highly relevant fields of core control and operator-process communication. A system for predictive core control is being developed while special mathematical methods for core power distribution control are being studied. Operator-process communication studies comprise use of computer simulation on colour display as important ingredients, while the work on developing a system for interactive plant disturbance analysis continues

  16. Project management for profit a failsafe guide to keeping projects on track and on budget

    CERN Document Server

    Knight, Joe; Angus, Brad; Case, John

    2012-01-01

    If your work involves projects, then this book is for you. It will show every company owner and project manager—at businesses large and small—how to run projects differently. You’ll benefit if you’ve ever: • been over budget on a project • exceeded a timeline on a projectworked on a project that completely stalled as you neared the finish line • lost money on a sure-thing project and had no idea why • noticed that scope and feature creep held you back • watched a project take three times as long as planned • felt too embarrassed to perform a review of your successes and failures • wondered whether your project actually made any money By the time you finish the book, you’ll be ready to implement Project Management for Profit in your own company—and be prepared to keep your projects on track and on budget.

  17. Work-based learning experiences help students with disabilities transition to careers: a case study of University of Washington projects.

    Science.gov (United States)

    Bellman, Scott; Burgstahler, Sheryl; Ladner, Richard

    2014-01-01

    This case study describes evidence-based practices employed by a collection of University of Washington projects that engage high school and postsecondary students with disabilities in work-based learning experiences such as industry and research internships, career development activities, job shadows, field trips, and mock interviews. The purpose of the article is two-fold. First, authors share best practices with others who wish to increase the participation of students with disabilities in work-based learning and thereby contribute to their academic and career success. The article discusses methods used to recruit students, employers and mentors, match students with specific opportunities, and prepare students for success. Second, authors share outcomes from studies regarding participation in these work-based learning opportunities, which include increased employment success, motivation to work toward a career, knowledge about careers and the workplace, job-related skills, ability to work with supervisors and coworkers, skills in self-advocating for accommodations, and perceived career options.

  18. Designing Business and Technology Management Work-Packages in Cleantech Research Projects

    DEFF Research Database (Denmark)

    Tambo, Torben; Enevoldsen, Peter

    2014-01-01

    a clearer and more explicit perspective of conversion from research to business in to research project in energy storage. This paper suggests a model view on the conversion capability within cleantech research projects in order to anchor a distinctive and methodological consideration for business...

  19. Radioactivity in north European waters: report of Working Group 2 of CEC project MARINA

    International Nuclear Information System (INIS)

    Camplin, W.C.; Aarkrog, A.

    1989-01-01

    The primary objective of Working Group 2 of Project MARINA was to consider recent measurements of environmental radioactivity in north European waters and to use this, and other information, to report likely magnitude of doses to the critical group from marine pathways. The monitoring data were supplemented, where appropriate, with predictions from simple models. The major sources of radioactivity studied were as follows: (i) liquid wastes from nuclear fuel reprocessing plants, (Sellafield, Dounreay, Cap de la Hague); (ii) liquid wastes from nuclear power plants and other major nuclear industry sites, (including Belgium, Denmark, France, Finland, GDR, FDR, Netherlands, Sweden, UK, USSR); (iii) solid waste disposal in the deep north-east Atlantic; (iv) fallout from Chernobyl; and (v) naturally-occurring radionuclides. (author)

  20. Flexible working hours, health, and well-being in Europe: some considerations from a SALTSA project.

    Science.gov (United States)

    Costa, Giovanni; Akerstedt, Torbjorn; Nachreiner, Friedhelm; Baltieri, Federica; Carvalhais, José; Folkard, Simon; Dresen, Monique Frings; Gadbois, Charles; Gartner, Johannes; Sukalo, Hiltraud Grzech; Härmä, Mikko; Kandolin, Irja; Sartori, Samantha; Silvério, Jorge

    2004-01-01

    The project brought together researchers from 9 EU-Countries and resulted in a number of actions, in particular the following: (a) There is an urgent need of defining the concept of flexible working hours, since it has been used in many different and even counterintuitive ways; the most obvious distinction is where the influence over the working hours lies, that is between the "company-based flexibility" and the "individual-oriented flexibility"; (b) The review of the Legislation in force in the 15 European countries shows that the regulation of working times is quite extensive and covers (Council Directive 93/104/EC) almost all the various arrangements of working hours (i.e., part-time, overtime, shift, and night work), but fails to provide for flexibility; (c) According to the data of the Third EU Survey on Working Conditions, longer and "irregular" working hours are in general linked to lower levels of health and well-being; moreover, low (individual) flexibility and high variability of working hours (i.e., company-based flexibility) were consistently associated with poor health and well-being, while low variability combined with high autonomy showed positive effects; (d) Six substudies from different countries demonstrated that flexible working hours vary according to country, economic sector, social status, and gender; overtime is the most frequent form of company-based flexibility but has negative effects on stress, sleep, and social and mental health; individual flexibility alleviates the negative effects of the company-based flexibility on subjective health, safety, and social well-being; (e) The literature review was able to list more than 1,000 references, but it was striking that most of these documents were mainly argumentative with very little empirical data. Thus, one may conclude that there is a large-scale intervention ongoing in our society with almost completely unknown and uncontrolled effects. Consequently, there is a strong need for systematic

  1. The Canada Goose Project: A First Project with Children under 3

    Science.gov (United States)

    Brewer, Ruth A.

    2010-01-01

    This project report describes how five children (an infant, three toddlers, and a preschooler) enrolled at a private day care home engaged in their first journey into project work through a study of Canada geese living on a nearby body of water. Prior to the experience described in this paper, the author had used the Project Approach only with…

  2. Learning how scientists work: experiential research projects to promote cell biology learning and scientific process skills.

    Science.gov (United States)

    DebBurman, Shubhik K

    2002-01-01

    Facilitating not only the mastery of sophisticated subject matter, but also the development of process skills is an ongoing challenge in teaching any introductory undergraduate course. To accomplish this goal in a sophomore-level introductory cell biology course, I require students to work in groups and complete several mock experiential research projects that imitate the professional activities of the scientific community. I designed these projects as a way to promote process skill development within content-rich pedagogy and to connect text-based and laboratory-based learning with the world of contemporary research. First, students become familiar with one primary article from a leading peer-reviewed journal, which they discuss by means of PowerPoint-based journal clubs and journalism reports highlighting public relevance. Second, relying mostly on primary articles, they investigate the molecular basis of a disease, compose reviews for an in-house journal, and present seminars in a public symposium. Last, students author primary articles detailing investigative experiments conducted in the lab. This curriculum has been successful in both quarter-based and semester-based institutions. Student attitudes toward their learning were assessed quantitatively with course surveys. Students consistently reported that these projects significantly lowered barriers to primary literature, improved research-associated skills, strengthened traditional pedagogy, and helped accomplish course objectives. Such approaches are widely suited for instructors seeking to integrate process with content in their courses.

  3. Expedited technology demonstration project (Revised mixed waste management facility project) Project baseline revision 4.0 and FY98 plan

    International Nuclear Information System (INIS)

    Adamson, M. G.

    1997-01-01

    The re-baseline of the Expedited Technology Demonstration Project (Revised Mixed Waste Facility Project) is designated as Project Baseline Revision 4.0. The last approved baseline was identified as Project Baseline Revision 3.0 and was issued in October 1996. Project Baseline Revision 4.0 does not depart from the formal DOE guidance followed by, and contained in, Revision 3.0. This revised baseline document describes the MSO and Final Forms testing activities that will occur during FY98, the final year of the ETD Project. The cost estimate for work during FY98 continues to be $2.OM as published in Revision 3.0. However, the funds will be all CENRTC rather than the OPEX/CENTRC split previously anticipated. LLNL has waived overhead charges on ETD Project CENRTC funds since the beginning of project activities. By requesting the $2.OM as all CENTRC a more aggressive approach to staffing and testing can be taken. Due to a cost under- run condition during FY97 procurements were made and work was accomplished, with the knowledge of DOE, in the Feed Preparation and Final Forms areas that were not in the scope of Revision 3.0. Feed preparation activities for FY98 have been expanded to include the drum opening station/enclosure previously deleted

  4. The USE Project

    DEFF Research Database (Denmark)

    Frøkjær, E.; Hornbæk, K.; Høegh, Rune Thaarup

    2006-01-01

    This paper provides experience from activities in the USE project. The USE project is a research project that aims at bridging the gap between usability evaluation and user interface design. It is conducted from 2005 to 2008 in collaboration between researchers from Aalborg University and Copenha......This paper provides experience from activities in the USE project. The USE project is a research project that aims at bridging the gap between usability evaluation and user interface design. It is conducted from 2005 to 2008 in collaboration between researchers from Aalborg University...... and Copenhagen University, and developers and managers working in software development organizations....

  5. The Future of Global Social Work

    Directory of Open Access Journals (Sweden)

    Miriam Potocky-Tripodi

    2005-05-01

    Full Text Available This article addresses the social work within the context of internationalism and globalization. Based on an examination of published documents on international social work in the past decade, the authors make an evidence-based projection of what is likely to occur in the future of global social work. Finally, the authors make a social work values-based projection of what should occur.

  6. IFRS Knowledge, Skills, and Abilities: A Follow-up Study of Employer Expectations for Undergraduate Accounting Majors

    Science.gov (United States)

    Yoon, Sung Wook; Vedd, Rishma; Jones, Christopher Gil

    2013-01-01

    Although the most recent International Financial Reporting Standards (IFRS) work plan report from the U.S. Securities and Exchange Commission no longer includes a timetable for the U.S. adoption of global financial accounting standards, experts predict that the United States will transition to some form of convergence later this decade. In…

  7. The Sudbury Neutrino Observatory project and the Kamiokande II project

    International Nuclear Information System (INIS)

    Beier, E.W.

    1991-01-01

    This document is a technical progress report on work performed at the University of Pennsylvania during the current year on the Sudbury Neutrino Observatory project and on the Kamiokande II project. The motivation for both experiments is the measurement of neutrinos emitted by the sun. The Kamiokande II experiment was an adaptation of an existing nucleon decay detector located in Japan to search for neutrinos emitted by the sun. It has been operational since 1986. Data taking was concluded in 1990 and work will terminate at the end of this grant year. The topics discussed in this report are: the Sudbury Neutrino Observatory project; photomultiplier tube measurements; photomultiplier bases; signal processing electronics; electronics system issues; software management and development; and Kamiokande II

  8. Implementation of a Tabu Search Heuristic for the Examinations ...

    African Journals Online (AJOL)

    Log in or Register to get access to full text downloads. ... The Examinations Timetabling Problem is the problem of assigning examinations and candidates to ... Generally, timetabling problems are NP-Hard and therefore very difficult to solve.

  9. Project 2010 For Dummies

    CERN Document Server

    Muir, Nancy C

    2010-01-01

    A friendly reference guide to Microsoft Project, the leading enterprise project management software. As project management software, Microsoft Project allows you to oversee your business activities effectively. You can manage resources, share project info, perform modeling and scenario analysis, and standardize reporting processes. This easy-to-understand guide is completely updated to cover the latest changes and newest enhancements to Project 2010 and shows you how to get Project 2010 to work for you. After an introduction to basic project management concepts, you'll discover the mechanics o

  10. Organizational skills training for a student with attention deficit and hyperactivity disorder

    OpenAIRE

    Ganc, Anja

    2012-01-01

    Implementation functions are skills that include organisation, planning, maintenance of attention, working memory, metacognition and time control. These processes have a significant impact on student’s school performance, since problems in the field of metacognition disable a student to choose appropriate strategies for learning. Troubles in the field of organisation consequently lead to problems with planning of learning time, forgetting of school timetable and relevant accessories for work ...

  11. Women of the Manhattan Project

    Science.gov (United States)

    Marshall, Jill

    2009-10-01

    In the book Their Day in the Sun, Ruth Howes and Caroline Herzenberg documented more than 1000 women who worked on the Manhattan Project, preserving their legacy for generations to come. At the 2009 Chicago meeting, the AAPT Committee on Women in Physics celebrated the accomplishments of these women and the men who worked beside them. Howes presented an overview of the contributions of women to the development of the first nuclear weapon, and the session was honored with talks from two Manhattan project veterans, Ellen Cleminshaw Weaver, who worked at Oak Ridge, and Dorothy Marcus Gans, who worked as a technician in the Metallurgical Laboratory in Chicago. I will present a summary of the session, analyzing the effect of working on the project on the career trajectories of the women involved, and point listeners toward additional documentation of this history.

  12. Words for Work Evaluation Report 2011

    Science.gov (United States)

    National Literacy Trust, 2011

    2011-01-01

    This document analyses and evaluates the findings of the second pilot year of the National Literacy Trust's speaking and listening project, Words for Work. This year's project worked with 219 year 9 pupils across England, and engaged 91 volunteers from the business community to facilitate group work that encouraged pupils to investigate their own…

  13. The QUANTUM I project: Parallel processing in a local area network work dedicated to ab initio calculation of potential hypersurfaces

    International Nuclear Information System (INIS)

    Lavenir, E.; Pic, J.M.; Alibran, P.; Leclercq, J.M.

    1987-01-01

    The QUANTUM I project is a three-stage device. The stages are respectively dedicated to particular steps of the ab initio determination of a point on the hypersurface. The first stage deals with the computation of the integrals between the basis functions, the second with the S.C.F. (or M.C.S.C.F.) process and the third with the C.I treatment. Each step is developed in terms of parallel mode (M.I.M.D.), the whole device working following a pipeline mode: the three stages works simultaneously for different points

  14. Work plan for monitor well installation water and sediment sample collection aquifer testing and topographic surveying at the Riverton, Wyoming, UMTRA Project Site

    International Nuclear Information System (INIS)

    1995-06-01

    Investigations conducted during preparation of the site observational work plan (SOWP) at the Uranium Mill Tailings Remedial Action (UMTRA) Project site support a proposed natural flushing ground water compliance strategy, with institutional controls. However, additional site-specific data are needed to reduce uncertainties in order to confirm the applicability and feasibility of this proposed compliance strategy option. This proposed strategy will be analyzed in the site-specific environmental assessment. The purpose of this work plan is to summarize the data collection objectives to fill those data needs, describe the data collection activities that will be undertaken to meet those objectives, and elaborate on the data quality objectives which define the procedures that will be followed to ensure that the quality of these data meet UMTRA Project needs

  15. Reviving large-scale projects

    International Nuclear Information System (INIS)

    Desiront, A.

    2003-01-01

    For the past decade, most large-scale hydro development projects in northern Quebec have been put on hold due to land disputes with First Nations. Hydroelectric projects have recently been revived following an agreement signed with Aboriginal communities in the province who recognized the need to find new sources of revenue for future generations. Many Cree are working on the project to harness the waters of the Eastmain River located in the middle of their territory. The work involves building an 890 foot long dam, 30 dikes enclosing a 603 square-km reservoir, a spillway, and a power house with 3 generating units with a total capacity of 480 MW of power for start-up in 2007. The project will require the use of 2,400 workers in total. The Cree Construction and Development Company is working on relations between Quebec's 14,000 Crees and the James Bay Energy Corporation, the subsidiary of Hydro-Quebec which is developing the project. Approximately 10 per cent of the $735-million project has been designated for the environmental component. Inspectors ensure that the project complies fully with environmental protection guidelines. Total development costs for Eastmain-1 are in the order of $2 billion of which $735 million will cover work on site and the remainder will cover generating units, transportation and financial charges. Under the treaty known as the Peace of the Braves, signed in February 2002, the Quebec government and Hydro-Quebec will pay the Cree $70 million annually for 50 years for the right to exploit hydro, mining and forest resources within their territory. The project comes at a time when electricity export volumes to the New England states are down due to growth in Quebec's domestic demand. Hydropower is a renewable and non-polluting source of energy that is one of the most acceptable forms of energy where the Kyoto Protocol is concerned. It was emphasized that large-scale hydro-electric projects are needed to provide sufficient energy to meet both

  16. Modern projection of the old electroscope for nuclear radiation quantitative work and demonstrations

    Science.gov (United States)

    Oliveira Bastos, Rodrigo; Baltokoski Boch, Layara

    2017-11-01

    Although quantitative measurements in radioactivity teaching and research are only believed to be possible with high technology, early work in this area was fully accomplished with very simple apparatus such as zinc sulphide screens and electroscopes. This article presents an experimental practice using the electroscope, which is a very simple apparatus that has been widely used for educational purposes, although generally for qualitative work. The main objective is to show the possibility of measuring radioactivity not only in qualitative demonstrations, but also in quantitative experimental practices. The experimental set-up is a low-cost ion chamber connected to an electroscope in a configuration that is very similar to that used by Marie and Pierre Currie, Rutherford, Geiger, Pacini, Hess and other great researchers from the time of the big discoveries in nuclear and high-energy particle physics. An electroscope leaf is filmed and projected, permitting the collection of quantitative data for the measurement of the 220Rn half-life, collected from the emanation of the lantern mantles. The article presents the experimental procedures and the expected results, indicating that the experiment may provide support for nuclear physics classes. These practices could spread widely to either university or school didactic laboratories, and the apparatus has the potential to allow the development of new teaching activity for nuclear physics.

  17. Organizing design work

    DEFF Research Database (Denmark)

    Scheuer, John Damm

    2016-01-01

    The aim of this paper is to demonstrate the importance of the kind of understanding of organizing that is implied by design theories for project managers' understanding and organizing of design work. Five theories and their organizing consequences for project managers organizing of design work...... are analyzed. The paper contributes to design research and organization studies by putting the organizing of design projects on the research agenda. It also contributes by demonstrating the importance of being aware of the ontological and epistemological assumptions and organizing consequences of different...... design theories. The selected theories of design thus represent different views on what design is, address different design areas and are based on different ontological and epistemological assumptions that influence their views on how design processes should be organized....

  18. FY 1994 Annual Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This is the third Office of Inspector General (OIG)Annual Work Plan. Its purpose is to summarize work completed in Fiscal Year (FY) 1993, identify ongoing projects from previous fiscal years which the OIG intends to continue into FY 1994, and announce planned projects which the OIG intends to begin in FY 19994.

  19. Reducing Cancer Health Disparities through Community Engagement: Working with Faith-Based Organizations (Project CHURCH)

    Science.gov (United States)

    Lorna H. McNeill, PhD, MPH, is Chair and Associate Professor in the Department of Health Disparities at the University of Texas MD Anderson Cancer Center. Dr. McNeill's research is on the elimination of cancer-related health disparities in minority populations. Her research has particular emphasis on understanding the influence of social contextual determinants of cancer in minorities, with a special focus of the role of physical activity as a key preventive behavior and obesity as a major cancer determinant. Her research takes place in minority and underserved communities such as public housing developments, black churches, community-based clinics and low-income neighborhoods-communities with excess cancer death rates. She has been continuously funded, receiving grants from various funding agencies (i.e., National Institutes of Health, Robert Wood Johnson Foundation, etc.), to better understand and design innovative solutions to address obesity in racial/ethnic minority communities. Dr. McNeill is PI of several community-based studies, primarily working with African American churches. One is a called Project CHURCH, an academic-faith-based partnership established to: 1) identify underlying reasons for health disparities in cancer and cancer risk factors (e.g., screening, diet) among AAs using a cohort study (N=2400), 2) engage AAs as partners in the research process, and 3) to ultimately eliminate disparities among AAs. In 2014 Dr. McNeill furthered her partnership through the Faith, Health, and Family (FHF) Collaborative. The goals of FHF are to enhance the Project CHURCH partnership to address family obesity in African Americans, strengthen the partnership by developing a larger coalition of organizations and stakeholders to address the problem, assess church and community interest in family obesity and develop an agenda to address obesity in faith settings. To date we have 50 churches as members. Dr. McNeill is also director of the Center for Community

  20. Download this PDF file

    African Journals Online (AJOL)

    pc

    the Faculty of Computer Science and Information Technology, Bayero University, Kano-Nigeria. The ... technologies for the implementation of web applications .... View Latest Update. View General Timetable. Customize Timetable. Customize Invigilation Schedules. View Lecture Guidelines/Etiquettes. View Examination ...

  1. “Freedom from Jobs” or learning to love to labor? Diversity advocacy and working imaginaries in Open Technology Projects

    Directory of Open Access Journals (Sweden)

    Christina Dunbar-Hester

    2016-12-01

    Full Text Available This paper examines imaginaries of work and labor in “open technology” projects (especially open source software and hackerspaces, based on ethnographic research in North America. It zeroes in on “diversity initiatives” within open technology projects. These initiatives are important because they expose many of the assumptions and tensions that surround participatory cultures. On the one hand, these projects and spaces are organized around voluntarism; in theory, everyone who wishes to participate is welcome to do so. On the other hand, diversity initiatives form in order to address the “problem” of imbalance in the ranks of participants. Technology is a unique domain for the discharge of political energies. In collective imagination, it has been vested with the power to initiate change (even as this belief obscures the role of social and economic relations. Multiple ideas circulate about the relationships between diversity in open technology projects and paid labor. This paper argues that in part due to the legacy of technical hobbies as training grounds for technical employment for much of the twentieth century, as documented by historians of radio (Douglas, 1987; Haring, 2006, voluntaristic technology projects are vexed sites for imagining political emancipation. To a large degree, diversity initiatives in open technology projects are consistent with corporate values of diversity as a marketplace value.  At the same time, collectivity formations around technology that incorporate feminist, antiracist, or social justice framings may begin to generate connections between diversity advocacy in tech fields and social justice movements or policy changes in order to effect deep social change. 

  2. Optical packet networks - conclusions from the IST DAVID project

    DEFF Research Database (Denmark)

    Dittmann, Lars

    2004-01-01

    This work outlines the result from the European research project DAVID working with optical packet switch solutions for both WAN and MAN. The project started July 2000 and has been completed successfully by the end of 2003.......This work outlines the result from the European research project DAVID working with optical packet switch solutions for both WAN and MAN. The project started July 2000 and has been completed successfully by the end of 2003....

  3. Inhibition, Updating Working Memory, and Shifting Predict Reading Disability Symptoms in a Hybrid Model: Project KIDS.

    Science.gov (United States)

    Daucourt, Mia C; Schatschneider, Christopher; Connor, Carol M; Al Otaiba, Stephanie; Hart, Sara A

    2018-01-01

    Recent achievement research suggests that executive function (EF), a set of regulatory processes that control both thought and action necessary for goal-directed behavior, is related to typical and atypical reading performance. This project examines the relation of EF, as measured by its components, Inhibition, Updating Working Memory, and Shifting, with a hybrid model of reading disability (RD). Our sample included 420 children who participated in a broader intervention project when they were in KG-third grade (age M = 6.63 years, SD = 1.04 years, range = 4.79-10.40 years). At the time their EF was assessed, using a parent-report Behavior Rating Inventory of Executive Function (BRIEF), they had a mean age of 13.21 years ( SD = 1.54 years; range = 10.47-16.63 years). The hybrid model of RD was operationalized as a composite consisting of four symptoms, and set so that any child could have any one, any two, any three, any four, or none of the symptoms included in the hybrid model. The four symptoms include low word reading achievement, unexpected low word reading achievement, poorer reading comprehension compared to listening comprehension, and dual-discrepancy response-to-intervention, requiring both low achievement and low growth in word reading. The results of our multilevel ordinal logistic regression analyses showed a significant relation between all three components of EF (Inhibition, Updating Working Memory, and Shifting) and the hybrid model of RD, and that the strength of EF's predictive power for RD classification was the highest when RD was modeled as having at least one or more symptoms. Importantly, the chances of being classified as having RD increased as EF performance worsened and decreased as EF performance improved. The question of whether any one EF component would emerge as a superior predictor was also examined and results showed that Inhibition, Updating Working Memory, and Shifting were equally valuable as predictors of the hybrid model of RD

  4. The Pedagogic Project as Provocative of the Collective Work in the School

    OpenAIRE

    Elaine Sampaio Araujo

    2007-01-01

    The objective of this article is to discuss, starting from the historical-cultural perspective, the sense of a pedagogic project considering its procedural nature, the convergence of the personal and collective dimensions and the educational purpose. The goal is to notice the project as possibility in the field pragmatic and in the theory of the sciences of human formation, linking the human development with the schools and its projects. For that, it tries to demonstrate that pedagogic projec...

  5. Seismic safety margins research program. Project VIII load combination project: work plan

    International Nuclear Information System (INIS)

    Chou, C.K.; Vepa, K.; George, L.; Smith, P.D.

    1979-01-01

    The proposed load combination project has the following overall objectives: develop a methodology for appropriate combination of dynamic loads for nuclear power plants under normal plant operation, transients, accidents, and natural hazards; establish design criteria, load factors, and component service levels for appropriate combinations of dynamic loads or responses to be used in nuclear power plant design; determine the reliability of typical piping systems, both inside and outside the containment structure, and provide the NRC with a sound technical basis for defining the criteria for postulating pipe breaks; and determine the probabilities of a large LOCA induced directly and indirectly by a range of earthquakes

  6. Applying the Kanban method in problem-based project work: a case study in a manufacturing engineering bachelor's programme at Aalborg University Copenhagen

    Science.gov (United States)

    Balve, Patrick; Krüger, Volker; Tolstrup Sørensen, Lene

    2017-11-01

    Problem-based learning (PBL) has proven to be highly effective for educating students in an active and self-motivated manner in various disciplines. Student projects carried out following PBL principles are very dynamic and carry a high level of uncertainty, both conditions under which agile project management approaches are assumed to be highly supportive. The paper describes an empirical case study carried out at Aalborg University Copenhagen involving students from two different semesters of a Bachelor of Science programme. While executing the study, compelling examples of how PBL and the agile project management method Kanban blend could be identified. A final survey reveals that applying Kanban produces noticeable improvements with respect to creating, assigning and coordinating project tasks. Other improvements were found in group communication, knowledge about the work progress with regards to both the individual and the collective and the students' way of continuously improving their own teamwork.

  7. Project management in libraries, archives and museums working with government and other external partners

    CERN Document Server

    Carpenter, Julie

    2010-01-01

    Aimed at practitioners and managers, this practical handbook provides a source of guidance on project management techniques for the academic and cultural heritage sectors, focusing on managing projects involving public sector and other external partners. Issues under consideration and illustration include: different approaches to managing projects and how to select appropriate methods; using project management tools and other applications in project development and implementation; ensuring the sustainability of project outcomes and transferability into practice; realistic monitoring methodolog

  8. Learning the Work of Ambitious Mathematics Teaching

    Science.gov (United States)

    Anthony, Glenda; Hunter, Roberta

    2013-01-01

    "Learning the Work of Ambitious Mathematics" project was developed to support prospective teachers learn the work of ambitious mathematics teaching. Building on the work of U.S. researchers in the "Learning in, from, and for Teaching Practice" project, we investigate new ways to make practice studyable within the university…

  9. Scope of work-supplemental standards-related fieldwork - Salt Lake City UMTRA Project Site, Salt Lake City, Utah

    International Nuclear Information System (INIS)

    1996-01-01

    This scope of work governs the field effort to conduct transient in situ (hereafter referred to by the trademark name HydroPunch reg-sign) investigative subsurface logging and ground water sampling, and perform well point installation services at the U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Salt Lake City, Utah. The HydroPunch reg-sign and well point services subcontractor (the Subcontractor) shall provide services as stated herein to be used to investigate the subsurface, collect and analyze ground water samples, and install shallow well points

  10. Student engagement in interprofessional working in practice placement settings.

    Science.gov (United States)

    Pollard, Katherine

    2009-10-01

    . To investigate the nature of student engagement in interprofessional interaction while on placement. Due to continuing emphasis on improving interprofessional collaboration, UK educational establishments are required to offer pre-qualifying health and social care students interprofessional education in order that they acquire relevant competencies. However, few formal interprofessional education initiatives occur in practice settings and little is known about pre-qualifying students' non-formal learning about interprofessional issues while on placement. From 2003-2005 an English Faculty of Health and Social Care conducted a qualitative study to explore opportunities for interprofessional learning and working available to students in practice placement settings. Case studies were conducted in a coronary care ward, a medical ward for older patients, a maternity unit, a paediatric unit, an integrated community learning disabilities team and a residential facility for adults with challenging behaviour. Gaining access was complex, due to variable student timetables and UK research governance requirements. Sites were therefore selected according to geographical area and timing of student placements. Details of interprofessional interaction (formal and informal) were observed and recorded. Interviews were conducted with a convenience sample of 20 practitioners and 15 students. Data were analysed thematically. Student experience varied considerably. Contributing factors included the influence of doctors and differing professional cultures; mentors' support for student engagement in interprofessional working; and individual students' confidence levels. Most sites were managed by nurses and some senior nurses were proactive in involving students interprofessionally. However, many students lacked systematic support for interprofessional engagement. Students lack parity of experience concerning interprofessional activity on placement. Where they do not have systematic

  11. MANAGING LARGE INVESTMENT PROJECTS IN GORJ

    Directory of Open Access Journals (Sweden)

    CÎRNU DORU

    2016-12-01

    Full Text Available Currently, the concept of project management is considered to be the best concept for efficient management of a project, so it is used all over the world, and most recently in our country. This concept is designed with all the general characteristics of project management, but adapted to the large investment projects. This paper presents the project management concept and project management organization for capital projects. This concept is conceived with all general characteristics of project management, but adopted to the condition of large investment projects. The concept also includes the project team and the project manager, the person authorized and responsible for achieving the objectives planned in the project. For efficient managing by project, it is necessary to insure a good compozition of project team, as a team of people who, in collaboration with project manager, work directly on managing the project. To effectively manage the project, it is necessary to ensure a proper composition of the project team, a team of people who, in collaboration with the project manager to work directly for project management. It is a particularly good method of achieving the objectives planned projects, which means a project with a certain level of performance required in a planned time, with planned costs.

  12. Managemant of NASA's major projects

    Science.gov (United States)

    James, L. B.

    1973-01-01

    Approaches used to manage major projects are studied and the existing documents on NASA management are reviewed. The work consists of: (1) the project manager's role, (2) request for proposal, (3) project plan, (4) management information system, (5) project organizational thinking, (6) management disciplines, (7) important decisions, and (8) low cost approach.

  13. Equal Opportunity, Equal Work: Increasing Women's Participation in the U.S. President's Malaria Initiative Africa Indoor Residual Spraying Project

    OpenAIRE

    Donner, Abigail; Belemvire, Allison; Johns, Ben; Mangam, Keith; Fiekowsky, Elana; Gunn, Jayleen; Hayden, Mary; Ernst, Kacey

    2017-01-01

    Background: One of the primary control measures for malaria transmission is indoor residual spraying (IRS). Historically, few women have worked in IRS programs, despite the income-generating potential. Increasing women's roles in IRS requires understanding the barriers to women's participation and implementing measures to address them. The U.S. President's Malaria Initiative (PMI) Africa Indoor Residual Spraying (AIRS) Project is the largest implementer of IRS globally. To address gender ineq...

  14. Scrum Project Management

    CERN Document Server

    Pries, Kim H

    2010-01-01

    Scrum, which was originally invented solely for software development, can now be applied to all types of projects. This book shows project managers how to implement Scrum by explaining the artifacts, rituals, and roles used. The text provides Scrum planning methods to control project scope and schedule as well as Scrum tracking methods to focus teams on improving throughput and streamlining communications. The authors show how to combine traditional project methods with Scrum and how to adapt the familiar work breakdown structure to create Scrum backlogs and sprints. They also demonstrate how

  15. Policy work as a reform project

    OpenAIRE

    Hal K. Colebatch

    2008-01-01

    One aspect of the modernization of liberal government in the late 20th century was an increased attention to policy, both as a concept for interrogating government, and as the basis for organizing work within government, leading to the development of ‘policy analysis’ as a decision tool. This paper reviews the development of specialised forms of ‘policy work’ in liberal western political systems in order to establish what can be learned by other sorts of polity, and in particular, the tran...

  16. Blackboard: making an impression in a visual world

    OpenAIRE

    Tannant, Maria; Garrett, Leigh; Power, Nick

    2009-01-01

    Rebranding Blackboard by students for students. The nature of creative and visual arts is very reflective and collaborative, therefore people had difficulty in applying Blackboard to this method of learning. Traditional teaching of non-arts subject matter is predominantly text based, thus many staff at UCA found the notion of Blackboard very challenging as a learning tool. It was also seen as merely a file repository holding reading lists, lecture notes and timetables. The UCA project te...

  17. Community interviews task report: Working draft: BWIP [Basalt Waste Isolation Project] Repository Project

    International Nuclear Information System (INIS)

    Bolton, P.A.

    1987-11-01

    The socioeconomic program for the Basalt Waste Isolation Project (BWIP) requires the collection of information about economic, social and cultural conditions, demographic, housing and settlement patterns, and the provision of public services and facilities in order to monitor and assess the impacts of the project on the study area. Much of the information needed by the socioeconomic program is compiled, maintained, and used by officials or staff members of local, regional, state, or tribal agencies or organizations. Because much of this information is prepared for internal use, the documents are often not published or advertised and it can be difficult for researchers to identify many obscure, yet useful, sources of information. In order to identify and gain access to this information, it is often most efficient to talk directly with officials and staff members of pertinent agencies or organizations who may have knowledge of these documents or who may have useful information themselves. Consequently, interviews in the study communities with persons knowledgeable about the socioeconomic or sociocultural characteristics of the area constitute an important source of data for the socioeconomic program. In addition to identifying various data sources, these interviews provide a mechanism for understanding and interpreting those data. Knowledge of specific local conditions is often necessary to correctly interpret quantitative data. The purpose of this paper is to summarize the objectives of the community interviews task and the general methods that will be used in conducting the community interviews. 3 refs

  18. Work activities within sustainable development

    Directory of Open Access Journals (Sweden)

    Francisco Duarte

    2015-06-01

    Full Text Available This paper presents the main results of a Franco-Brazilian Research project entitled "Work, Innovation and Development". The aim is to conceptually consider work activity within sustainable development, and to contribute methodologically towards developing strategies for designing sustainable work systems. After a brief description of the factors and the dimensions that have contributed to the creation of ideas on sustainable development, we will put forward two main approaches for understanding work activity within the context of sustainability, these being: the durability of work activity and the development of work activities for sustainable development. Both approaches are presented and examples are given. This is followed by a discussion of the design of sustainable work systems that focuses particularly on the political and technical dimensions of project management.

  19. Study of human body: Kinematics and kinetics of a martial arts (Silat) performers using 3D-motion capture

    Science.gov (United States)

    Soh, Ahmad Afiq Sabqi Awang; Jafri, Mohd Zubir Mat; Azraai, Nur Zaidi

    2015-04-01

    The Interest in this studies of human kinematics goes back very far in human history drove by curiosity or need for the understanding the complexity of human body motion. To find new and accurate information about the human movement as the advance computing technology became available for human movement that can perform. Martial arts (silat) were chose and multiple type of movement was studied. This project has done by using cutting-edge technology which is 3D motion capture to characterize and to measure the motion done by the performers of martial arts (silat). The camera will detect the markers (infrared reflection by the marker) around the performer body (total of 24 markers) and will show as dot in the computer software. The markers detected were analyzing using kinematic kinetic approach and time as reference. A graph of velocity, acceleration and position at time,t (seconds) of each marker was plot. Then from the information obtain, more parameters were determined such as work done, momentum, center of mass of a body using mathematical approach. This data can be used for development of the effectiveness movement in martial arts which is contributed to the people in arts. More future works can be implemented from this project such as analysis of a martial arts competition.

  20. Project Read[R] Phonology. What Works Clearinghouse Intervention Report

    Science.gov (United States)

    What Works Clearinghouse, 2010

    2010-01-01

    "Project Read"[R] is a multisensory language arts curriculum designed for use in a classroom or group setting. Two main objectives of the program are to use language in all its forms, and to use responsive instruction rather than preplanned textbook lessons. The program emphasizes direct instruction, and lessons move from letter-sounds…

  1. Mapping and industrial IT project to a 2nd semester design-build project

    DEFF Research Database (Denmark)

    Nyborg, Mads; Høgh, Stig

    2010-01-01

    CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project in the D......CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project...... in the Diploma IT program at the Technical University of Denmark. The system in question is a weighing system operating in a LAN environment. The system is used in the medical industry for producing tablets. We present the design of a curriculum to support the development of major components of the weighing...... system. A simple teaching model for software engineering is presented which combines technical disciplines with disciplines from section 2-4 in the CDIO syllabus. The implementation of a joint project involving several courses supports the CDIO perspective. Already the traditional IT-diploma education...

  2. Teaching Engineering Students Team Work

    Science.gov (United States)

    Levi, Daniel

    1998-01-01

    The purpose of this manual is to provide professor's in engineering classes which the background necessary to use student team projects effectively. This manual describes some of the characteristics of student teams and how to use them in class. It provides a set of class activities and films which can be used to introduce and support student teams. Finally, a set of teaching modules used in freshmen, sophomore, and senior aeronautical engineering classes are presented. This manual was developed as part of a NASA sponsored project to improve the undergraduate education of aeronautical engineers. The project has helped to purchase a set of team work films which can be checked out from Cal Poly's Learning Resources Center in the Kennedy Library. Research for this project has included literature reviews on team work and cooperative learning; interviews, observations, and surveys of Cal Poly students from Industrial and Manufacturing Engineering, Aeronautical Engineering and Psychology; participation in the Aeronautical Engineering senior design lab; and interviews with engineering faculty. In addition to this faculty manual, there is a student team work manual which has been designed to help engineering students work better in teams.

  3. HAZWOPER work plan and site safety and health plan for the Alpha characterization project at the solid waste storage area 4 bathtubbing trench at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1994-07-01

    This work plan/site safety and health plan is for the alpha sampling project at the Solid Waste Storage Area 4 bathtubbing trench. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division and associated ORNL environmental, safety, and health support groups. This activity will fall under the scope of 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER). The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. Work will be conducted in accordance with requirements as stipulated in the ORNL HAZWOPER Program Manual and applicable ORNL; Martin Marietta Energy Systems, Inc.; and U.S. Department of Energy policies and procedures. The levels of protection and the procedures specified in this plan are based on the best information available from historical data and preliminary evaluations of the area. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project. Unforeseeable site conditions or changes in scope of work may warrant a reassessment of the stated protection levels and controls. All adjustments to the plan must have prior approval by the safety and health disciplines signing the original plan

  4. International Arctic Seas Assessment Project (IASAP)

    International Nuclear Information System (INIS)

    Sjoeblom, K.L.; Linsley, G.S.

    1995-01-01

    The purpose of this paper was to give an overall view of the International Arctic Seas Assessment Project (IASAP). The IASAP project was initiated in 1993 to address concerns about the possible health and environmental impacts of radioactive wastes dumped in the shallow waters of the Arctic seas by the former Soviet Union. The project is being executed as a part of the IAEA's responsibilities under the Convention on the Prevention of Marine Pollution by Dumping of Wastes and Other Matter (London Convention 1972). The results and conclusions of the project are expected to be reported to the London Convention in late 1996. The objectives of the project are: 1) to assess the risks to human health and to the environment associated with the radioactive waste dumped in the Kara and Barents Seas; and 2) to examine possible remedial actions related to the dumped wastes and to advise on whether they are necessary and justified. The project is organized in five working areas: source terms, existing environmental concentrations, transfer mechanisms and models, impact assessment and remedial measures. Progress made in all working areas of IASAP is reviewed each year by a group of senior scientists (IASAP Advisory Group Meeting). During the first two years of the IASAP project, a considerable amount of new information has been produced and published as IASAP working documents. Experts from 15 countries and several international organizations are involved in the different Working Groups and Advisory Group Meetings of the project. It is planned that in addition to the report to the London Convention, which will be prepared by the Advisory Group, detailed technical reports covering the work of all areas of the IASAP will be produced. 12 refs., 3 figs., 1 tab

  5. Production of Working Reference Materials for the Capability Evaluation Project

    Energy Technology Data Exchange (ETDEWEB)

    Phillip D. Noll, Jr.; Robert S. Marshall

    1999-03-01

    Nondestructive waste assay (NDA) methods are employed to determine the mass and activity of waste-entrained radionuclides as part of the National TRU (Trans-Uranic) Waste Characterization Program. In support of this program the Idaho National Engineering and Environmental Laboratory Mixed Waste Focus Area developed a plan to acquire capability/performance data on systems proposed for NDA purposes. The Capability Evaluation Project (CEP) was designed to evaluate the NDA systems of commercial contractors by subjecting all participants to identical tests involving 55 gallon drum surrogates containing known quantities and distributions of radioactive materials in the form of sealed-source standards, referred to as working reference materials (WRMs). Although numerous Pu WRMs already exist, the CEP WRM set allows for the evaluation of the capability and performance of systems with respect to waste types/configurations which contain increased amounts of {sup 241}Am relative to weapons grade Pu, waste that is dominantly {sup 241}Am, as well as wastes containing various proportions of depleted uranium. The CEP WRMs consist of a special mixture of PuO{sub 2}/AmO{sub 2} (IAP) and diatomaceous earth (DE) or depleted uranium (DU) oxide and DE and were fabricated at Los Alamos National Laboratory. The IAP WRMS are contained inside a pair of welded inner and outer stainless steel containers. The DU WRMs are singly contained within a stainless steel container equivalent to the outer container of the IAP standards. This report gives a general overview and discussion relating to the production and certification of the CEP WRMs.

  6. [Project work: formation of health-care personnel for self-care of tunnelled central venous catheters in hemodialysis patients of the territory].

    Science.gov (United States)

    Morale, Walter; Patanè, D; Incardona, C; Seminara, G; Malfa, P; L'Anfusa, G; Calcara, G; Bisceglie, P; Puliatti, D; Di Landro, D

    2013-01-01

    Scientific data from current literature demonstrate an incidence of bacteraemia due to tunnelled central venous catheter (tCVC) use accounting for 1.6 / 1000 days per tCVC, with a range of 1.5 to 1.8. In Sicily no data on the incidence of tCVC- related bacteraemia are available. In our hospital, tCVC infection occurs 2.4 times in 1000 days during CVC use. A retrospective analysis carried out from 2006 to 2012 was performed on 650 patients with tunnelled catheters. Of the subjects who received tCVC in our hospital, 90% were destined to undergo haemodialysis in a private health care environment outside our hospital. In order to improve the aforementioned infection outcome, we planned and implemented a specific work project. The work project (WP) was subdivided into two steps: 1) The first step was further subdivided into two sub-phases. The first was principally concerned with the implementation of educational courses, conducted directly on the ward and aimed at the implementation of meticulous nursing regimes for the care of tCVC by our health care nurse. The courses were entitled Management of Vascular Access: from doing - to teaching to do!. These educational courses were organized by the Nephrology Department, which takes care of the management and handling of the major complications of tCVCs for the maintenance of haemodialysis. After this first step, the nurses who had participated became the promoters of the second part of the course, which concerned the development of know-how within an outpatient clinic, which deals exclusively with the nursing management of tCVCs. 2) The title of the second phase was Therapeutic Education: self-Care and understanding and managing your venous access at home. The aim of this step was the integration of correct in-hospital care with that available in outsourced private institutions, via the involvement of the patient in the management of their own central venous access. During our training project, a more detailed analysis of

  7. Detroit Works Long-Term Planning Project: Engagement Strategies for Blending Community and Technical Expertise

    Directory of Open Access Journals (Sweden)

    Toni L. Griffin

    2014-10-01

    Full Text Available In January 2013, civic leaders, community stakeholders, and residents came together to release Detroit Future City: 2012 Detroit Strategic Framework Plan, a guiding blueprint for transforming Detroit from its current state of population loss and excessive vacancy into a model for the reinvention of post-industrial American cities. Three years prior, the U.S. Census had reported that the city had lost 24% of its population over the last decade and had experienced a 20% increase in vacant and abandoned property, bringing total vacancy to roughly the size of Manhattan. In addition to physical and economic challenges, Detroiters had also acknowledged significant barriers to effective civic engagement. Foremost among these barriers were a profound sense of immobilization, planning fatigue, and a general perception of cynicism about planning and engagement efforts. These challenges were compounded by historic racial dynamics and tension. This case study elaborates on the comprehensive and innovative civic engagement executed in a citywide planning process called the Detroit Works Project, which took place from late 2010 through late 2012. For the citywide planning process to be successful and sustainable, civic leaders and project funders committed to a planning initiative that would be different from previous efforts, in large part because the “owners” of the process would be diverse and inclusive across all community sectors. The case study, written by three of the key consultants from the project, describes four key civic engagement strategies deployed in the creation of the strategic framework: (1 addressing profound challenges of culture, race, and politics by deliberately building trust; (2 elevating community expertise by fostering a sense of ownership of the process; (3 blending technical and community expertise; and (4 viewing civic engagement as an ongoing two-way conversation rather than a series of large-scale episodic events. This

  8. Skeletal remodeling dynamics: New approaches with imaging instrumentation

    International Nuclear Information System (INIS)

    Parks, N.J.; Pinkerton, K.E.; Seibert, J.A.; Pool, R.R.

    1991-01-01

    This report of progress and future objectives timetable is based on an included schematic of goals and objectives and the project abstract which is included as Appendix 1. Five matters are summarized in the order of (1) novel methods of calcified bone confocal microscopy and reconstruction image analysis of decalcified beagle and human cortical bone serial sections, (2) macroscopic cross-correlation of beagle and human cortical and cancellous bone fractions with CT analysis, (3) guidance to the most radiobiologically important skeletal regions of interest with the just completed 90 Sr bone tumor map from life time beagle studies, (4) deposition patterns of radioactive agents that participate in apatite crystal nucleation processes in bone and leave radiation-excited electrons trapped in bone mineral, and (5) the budget period timetable. The discovery that beta particles from 166 Ho (T 1/2 =26 hr, β max = 1.8 MeV) phosphonic acid bone agents leave detectable, long-lived, electron paramagnetic resonance signals in bone is included in Appendix 2 as a joint report

  9. Computation and evaluation of scheduled waiting time for railway networks

    DEFF Research Database (Denmark)

    Landex, Alex

    2010-01-01

    Timetables are affected by scheduled waiting time (SWT) that prolongs the travel times for trains and thereby passengers. SWT occurs when a train hinders another train to run with the wanted speed. The SWT affects both the trains and the passengers in the trains. The passengers may be further...... affected due to longer transfer times to other trains. SWT can be estimated analytically for a given timetable or by simulation of timetables and/or plans of operation. The simulation of SWT has the benefit that it is possible to examine the entire network. This makes it possible to improve the future...

  10. Projects as value constellations

    DEFF Research Database (Denmark)

    Laursen, Markus

    Creating value has been outlined as very central to projects applying the organizational perspective to projects. It has been suggested that value is created in value constellations or project networks, where actors work together to create value. However, research on the value creation process...... in value constellations is scarce, and through an exploratory study of two project networks in a cultural setting we investigate how value is created in value constellations. We outline how each project may be a distinct type of value constellation, one project creates value for the partners of the network...... as a consortium, and the project creates value primarily for others as a facilitator....

  11. Guidelines for Automation Project Execution

    OpenAIRE

    Takkinen, Heidi

    2011-01-01

    The purpose of this Master’s thesis was to create instructions for executing an automation project. Sarlin Oy Ab needed directions on how to execute an automation project. Sarlin is starting up a new business area offering total project solutions for customers. Sarlin focuses on small and minor automation projects on domestic markets. The thesis represents issues related to project execution starting from the theory of the project to its kick-off and termination. Site work is one importan...

  12. Nevada Nuclear Waste Storage Investigations. FY 1979 project plan

    International Nuclear Information System (INIS)

    1979-03-01

    This document presents the management and cost for the Nevada Nuclear Waste Storage Investigations (disposal of high-level wastes at Nevada Test Site) and provides a complete description of the overall project, management structure, technical approach, and work breakdown structure. The document is organized into five major sections. Section I summarizes the history of the project and indicates a potential future course of action. FY 1979 project work is briefly described in Section II. Section III outlines the delegated responsibilities of all project management functions. A list of critical questions that guide the technical approach of the project are presented in Section IV. Section V contains subtask work plans which outline the work in detail for this fiscal year

  13. La construcción de proyectos de trabajo en jóvenes escolarizados The construction of work projects in youth students

    Directory of Open Access Journals (Sweden)

    Silvia Batlle

    2011-12-01

    Full Text Available Este trabajo analiza algunas dimensiones del proyecto de trabajo de jóvenes escolarizados: expectativas y aspiraciones, caracteristicas personales de iniciativa, estrategias de búsqueda de trabajo, valores laborales, definiciones del trabajo y percepción de recursos y obstáculos para la inserción laboral. La metodología es cuantitativa. Se tomaron 1546 cuestionarios autoadministrables a alumnos de escuelas medias públicas de la Ciudad Autónoma de Buenos Aires: 707 mujeres y 839 varones. El promedio de edad en primer año fue de 14 años; en tercer año de 16 años y en quinto año de 18 años. Se han realizado análisis descriptivos, análisis de varianzas (ANOVA y utilizado pruebas no paramétricas. En este trabajo se han delimitado importantes dimensiones que inluyen en la construcción de los proyectos laborales y se han encontrado variables potentes para explicar las diferencias al interior de la población estudiada: sexo, especialidad, experiencia laboral, año de la trayectoria escolar y repetición.This paper analyzes some dimensions of work projects of youth students: expectations and aspirations, personal characteristics of initiative, work search strategies, work values, deinitions of work and perception of resources and obstacles for labor insertion. The methodology is quantitative. 1546 self-managing questionnaires to students from public secondary schools of the C.A.B.A. were taken: 707 women and 839 men. The age's average in the irst year was of 14 years old; in the third year of 16 years old and in the ifth year of 18 years old. Descriptive analyses and analyses of variances have been made (ANOVA and non-parametric tests were applied. In this work important dimensions that inluence in the construction of work projects have been delimited and there have been found powerful variables to explain the differences within the studied population: sex, specialty, work experience, year of the scholastic trajectory and repetition.

  14. Nuclear data development work in support of the National Bureau of Standards ISNF Project. Status report, February 1976-July 1980

    International Nuclear Information System (INIS)

    LaBauve, R.J.; George, D.C.; Muir, D.W.; Soran, P.D.; Eisenhauer, C.M.

    1980-12-01

    Work in several areas was completed by the Los Alamos Scientific Laboratory for the National Bureau of Standards in connection with the Intermediate-Energy Standard Neutron Field (ISNF) project during this reporting period. These areas include supplying multigroup cross section sets from ENDF/B-IV appropriate for ISNF calculations; determining the effects of small changes in calculational parameters, including cross section changes, in LSNF results; providing additional selected multigroup cross section sets from both ENDF/B-IV and ENDF/B-V; and performing comparison ISNF calculations using discrete ordinates and Monte Carlo codes. Plans for future work are briefly mentioned. 12 figures, 5 tables

  15. Equal Opportunity, Equal Work: Increasing Women's Participation in the U.S. President's Malaria Initiative Africa Indoor Residual Spraying Project.

    Science.gov (United States)

    Donner, Abigail; Belemvire, Allison; Johns, Ben; Mangam, Keith; Fiekowsky, Elana; Gunn, Jayleen; Hayden, Mary; Ernst, Kacey

    2017-12-28

    One of the primary control measures for malaria transmission is indoor residual spraying (IRS). Historically, few women have worked in IRS programs, despite the income-generating potential. Increasing women's roles in IRS requires understanding the barriers to women's participation and implementing measures to address them. The U.S. President's Malaria Initiative (PMI) Africa Indoor Residual Spraying (AIRS) Project is the largest implementer of IRS globally. To address gender inequity in IRS operations, PMI AIRS assessed the barriers to the participation of women and developed and implemented policies to address these barriers. The PMI AIRS Project initially identified barriers through a series of informal assessments with key stakeholders. PMI AIRS then implemented a series of gender-guided policies, starting in 2015, in Benin, Ethiopia, Ghana, Mali, Madagascar, Mozambique, Rwanda, Senegal, Zambia, and Zimbabwe. The policies included adapting physical work environments to ensure privacy for women; ensuring the safety of women in the workplace; guaranteeing safety and job security of women during pregnancy; and encouraging qualified women to apply for supervisory positions. The project collected routine programmatic data on staff, spray quality, and spray efficiency; data from 2012 through the end of 2015 were analyzed (up through 1 year after implementation of the gender policies). In addition, PMI AIRS conducted surveys in 2015, 2016, and 2017 before and after the spray campaigns in 4 countries to determine changes in gender norms among spray operators through questions about decision making and agency. The PMI AIRS Project increased women's employment with the program. Specifically, women's employment increased overall from 23% in 2012 to 29% in 2015, with a 2015 range from 16% (Mali) to 40% (Madagascar). Growth among supervisor roles was even stronger, with the percentage of women in supervisory roles increasing from 17% in 2012 to 46% in 2015, with a 2015

  16. Project Identification and Formulation

    DEFF Research Database (Denmark)

    Lund, Søren; Lønholdt, Jens

    2005-01-01

    Provides the necessary conceptual framework and tools to assess all appropriate aspects of water and sanitation projects in developing countries. Appeals to graduate environmental engineering students, practitioners, economists, sociologists, and institutional planners working with water...... and sanitation projects in developing countries....

  17. Sustainable Energy (SUSEN) project

    International Nuclear Information System (INIS)

    Richter, Jiri

    2012-01-01

    Research Centre Rez and University of West Bohemia started preparatory work on the 'Sustainable Energy' project, financed from EU structural funds. The goals and expected results of the project, its organization, estimated costs, time schedule and current status are described. (orig.)

  18. Learning to work together - lessons from a reflective analysis of a research project on public involvement.

    Science.gov (United States)

    Howe, A; Mathie, E; Munday, D; Cowe, M; Goodman, C; Keenan, J; Kendall, S; Poland, F; Staniszewska, S; Wilson, P

    2017-01-01

    Patient and public involvement (PPI) in research is very important, and funders and the NHS all expect this to happen. What this means in practice, and how to make it really successful, is therefore an important research question. This article analyses the experience of a research team using PPI, and makes recommendations on strengthening PPI in research. There were different PPI roles in our study - some people were part of the research team: some were on the advisory group; and there were patient groups who gave specific feedback on how to make research work better for their needs. We used minutes, other written documents, and structured individual and group reflections to learn from our own experiences over time. The main findings were:- for researchers and those in a PPI role to work in partnership, project structures must allow flexibility and responsiveness to different people's ideas and needs; a named link person can ensure support; PPI representatives need to feel fully included in the research; make clear what is expected for all roles; and ensure enough time and funding to allow meaningful involvement. Some roles brought more demands but also more rewards than others - highlighting that it is important that people giving up their time to help with research experience gains from doing so. Those contributing to PPI on a regular basis may want to learn new skills, rather than always doing the same things. Researchers and the public need to find ways to develop roles in PPI over time. We also found that, even for a team with expertise in PPI, there was a need both for understanding of different ways to contribute, and an evolving 'normalisation' of new ways of working together over time, which both enriched the process and the outputs. Background Patient and public involvement (PPI) is now an expectation of research funders, in the UK, but there is relatively little published literature on what this means in practice - nor is there much evaluative research

  19. OECD Halden reactor project

    International Nuclear Information System (INIS)

    1979-01-01

    This is the nineteenth annual Report on the OECD Halden Reactor Project, describing activities at the Project during 1978, the last year of the 1976-1978 Halden Agreement. Work continued in two main fields: test fuel irradiation and fuel research, and computer-based process supervision and control. Project research on water reactor fuel focusses on various aspects of fuel behavior under normal, and off-normal transient conditions. In 1978, participating organisations continued to submit test fuel for irradiation in the Halden boiling heavy-water reactor, in instrumented test assemblies designed and manufactured by the Project. Work included analysis of the impact of fuel design and reactor operating conditions on fuel cladding behavior. Fuel performance modelling included characterization of thermal and mechanical behavior at high burn-up, of fuel failure modes, and improvement of data qualification procedures to reduce and quantify error bands on in-reactor measurements. Instrument development yielded new or improved designs for measuring rod temperature, internal pressure, axial neutron flux shape determination, and for detecting cladding defects. Work on computer-based methods of reactor supervision and control included continued development of a system for predictive core surveillance, and of special mathematical methods for core power distribution control

  20. Overview of work at the OECD/Nea data bank for the TDB project

    International Nuclear Information System (INIS)

    Mompean, F.

    2002-01-01

    The NEA TDB Project aims at making available a comprehensive, internally consistent and quality-assured chemical thermodynamic database of selected chemical elements in order to meet the specialized modelling requirements for safety assessments of radioactive waste disposal systems. The project was initiated by the NEA in 1984 and reorganized in 1998. During the period 1984-1998 (TDB Project Phase I, TDB-I), reviews on the chemical thermodynamics for the following elements were completed: U, Am and Tc. A further review originating from TDB-I and dealing with data for Np and Pu appeared in print in May 2001. Although not strictly a part of TDB-I, a further collective publication of OECD/NEA [5] is a much-cited reference in the field of aquatic chemistry. The second phase of the TDB Project (TDB Project Phase II, TDB-II) was started in 1998 following an agreement between the following Participating Organisations. (author)

  1. 77 FR 8002 - Unified Agenda of Federal Regulatory and Deregulatory Actions

    Science.gov (United States)

    2012-02-13

    ... include requirements for public rights-of-way. Timetable: Action Date FR Cite Notice of Intent to Form...) Accessibility Guidelines for Buildings and Facilities: Public Rights- of-Way. ARCHITECTURAL AND TRANSPORTATION... ferries, excursion boats, and other passenger vessels. Timetable: Action Date FR Cite Notice of Intent to...

  2. Inhibition, Updating Working Memory, and Shifting Predict Reading Disability Symptoms in a Hybrid Model: Project KIDS

    Directory of Open Access Journals (Sweden)

    Mia C. Daucourt

    2018-03-01

    Full Text Available Recent achievement research suggests that executive function (EF, a set of regulatory processes that control both thought and action necessary for goal-directed behavior, is related to typical and atypical reading performance. This project examines the relation of EF, as measured by its components, Inhibition, Updating Working Memory, and Shifting, with a hybrid model of reading disability (RD. Our sample included 420 children who participated in a broader intervention project when they were in KG-third grade (age M = 6.63 years, SD = 1.04 years, range = 4.79–10.40 years. At the time their EF was assessed, using a parent-report Behavior Rating Inventory of Executive Function (BRIEF, they had a mean age of 13.21 years (SD = 1.54 years; range = 10.47–16.63 years. The hybrid model of RD was operationalized as a composite consisting of four symptoms, and set so that any child could have any one, any two, any three, any four, or none of the symptoms included in the hybrid model. The four symptoms include low word reading achievement, unexpected low word reading achievement, poorer reading comprehension compared to listening comprehension, and dual-discrepancy response-to-intervention, requiring both low achievement and low growth in word reading. The results of our multilevel ordinal logistic regression analyses showed a significant relation between all three components of EF (Inhibition, Updating Working Memory, and Shifting and the hybrid model of RD, and that the strength of EF’s predictive power for RD classification was the highest when RD was modeled as having at least one or more symptoms. Importantly, the chances of being classified as having RD increased as EF performance worsened and decreased as EF performance improved. The question of whether any one EF component would emerge as a superior predictor was also examined and results showed that Inhibition, Updating Working Memory, and Shifting were equally valuable as predictors of the

  3. Performance allocation traceable to regulatory criteria as applied to site characterization work at the Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    Deju, R.A.; Babad, H.; Bensky, M.S.; Jacobs, G.K.

    1983-01-01

    The Basalt Waste Isolation Project has developed a method for defining in detail the work required to demonstrate the feasibility of emplacing and providing for the safe isolation of nuclear wastes in a repository in the deep basalts at the Hanford Site near Richland, Washington. Criteria analysis allows the identification of areas of significant technical uncertainty or controversy that can be highlighted as issues. A preliminary analysis has been conducted, which, by identifying key radionuclides and allocating performance among the multiple barriers in a repository constructed in a basalt, allows the design and development testing activities at the Basalt Waste Isolation Project to be put into perspective. Application of sophisticated uncertainty analysis techniques will allow refinements in the analysis to be made and to further guide characterization and testing activities. Preliminary results suggest that a repository constructed in basalt will provide for the safe isolation of nuclear wastes in a cost-effective and reliable manner with a high degree of confidence

  4. Project-based fieldwork: perspectives of graduate entry students and project sponsors.

    Science.gov (United States)

    Fortune, Tracy; McKinstry, Carol

    2012-08-01

    This article builds on an earlier viewpoint regarding the need for project-focussed fieldwork. It presents the findings of an evaluative study into the value of project placements undertaken by final year graduate entry master's students as part of a capstone subject. The authors argue that provision of project placements enable impending graduates to develop and implement macro level strategies to develop prevention, resource and service development skills often required of contemporary occupational therapy practitioners. A qualitative approach is adopted. Student cohorts from 2005 and 2006 completed open-ended, written questionnaires, and agency project sponsors were interviewed to obtain their perspectives of the project placement experience. Despite some concern that project placements might be undertaken at the expense of 'clinical' placements these findings reveal that projects managed by students were perceived by services to add great value enabling them to advance important priorities. Students and sponsors highlighted a range of positive learning outcomes, including the ability to work collaboratively with supervisors and develop advanced communication skills and political acumen. The success of such placements depends on supportive supervision from academic staff. CONCLUSIONS AND SIGNIFICANCE OF THE STUDY: The findings promote project placements as a highly authentic aspect of work integrated learning enabling learners to draw together a range of attributes that support the ability to manage complex issues that have occupational relevance at a macro level. In addition, such experiences help learners to develop agency and political acumen both increasingly important capabilities for the contemporary workplace. © 2012 The Authors Australian Occupational Therapy Journal © 2012 Occupational Therapy Australia.

  5. Project Management Yinyang: Coupling project success and client satisfaction

    Directory of Open Access Journals (Sweden)

    Greg Stewart Usher

    2017-06-01

    Full Text Available Our research applies paradox theory to a project management construct to help project management researchers and practitioners understand the tensions that can exist between project success and client satisfaction. Our research highlights that although project success and client satisfaction are both present within a project management construct, they also belong to different functional systems. Project success and client satisfaction have different systemic-discourses and use different language games to convey information. These distinctions can create latent and sometimes salient tensions within the project management construct that project managers must understand, embrace, and work with. We have used a Grounded Theory (GT methodology to explore the lived experience of project managers, and from this have identified a phenomenon which we have termed project management yinyang. Project management yinyang is the state that exists when both project success and Client satisfaction are tightly coupled within the project management construct. Project management yinyang highlights that these two phenomena cannot be viewed as separate elements because the ‘seed’ of each exists within the other. And to truly achieve one, you must also achieve the other. Our findings indicate that in order to create project management yinyang the project manager must embrace a paradoxical yet holistic philosophy. They must understand the complementarity, interdependency, and structural coupling that exists between the positivist and interpretivist paradigms within the project management construct. They must understand how satisfaction (Yin and success (Yang are created through focus. Furthermore, they must understand how project management yinyang is separate from, but borne from, the convergence of the other two elements.

  6. Managing complex, high risk projects a guide to basic and advanced project management

    CERN Document Server

    Marle, Franck

    2016-01-01

    Maximizing reader insights into project management and handling complexity-driven risks, this book explores propagation effects, non-linear consequences, loops, and the emergence of positive properties that may occur over the course of a project. This book presents an introduction to project management and analysis of traditional project management approaches and their limits regarding complexity. It also includes overviews of recent research works about project complexity modelling and management as well as project complexity-driven issues. Moreover, the authors propose their own new approaches, new methodologies and new tools which may be used by project managers and/or researchers and/or students in the management of their projects. These new elements include project complexity definitions and frameworks, multi-criteria approaches for project complexity measurement, advanced methodologies for project management (propagation studies to anticipate potential behaviour of the project, and clustering approaches...

  7. The Project Team: Features, Effectiveness and Leadership

    Directory of Open Access Journals (Sweden)

    Ramona-Elena GABREA

    2017-06-01

    Full Text Available The project team that is responsible for providing flexibility and innovation to this structure in order to enable organizations to remain successful (1. The very nature of the project team's work underpins a collective task much more complex than that assumed by other types of work teams. The aim of this paper is to explore the main factors that determine the project team effectiveness. The research methodology was the literature review. The main finding reveals that the organizational structure of projects and the project team should not be considered as a panacea for all problems of organizational effectiveness.

  8. Competency model for the project managers of technical projects

    Science.gov (United States)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  9. MORE: Management of requirements in NPP modernisation projects. Project report 2007

    International Nuclear Information System (INIS)

    Fredriksen, R.; Katta, V.; Raspotnig, C.; Valkonen, J.

    2008-03-01

    This report documents the work and related activities of the MORE project in the period January 1 - December 31 in 2007. The focus of this report is on improvements of the former project results, to identify and apply a couple of case studies from NPP projects, and activities in order to initiate and implement the industrial take-up and utilisation of the research results in real modernisation projects. The report also provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  10. MORE: Management of requirements in NPP modernisation projects. Project report 2007

    Energy Technology Data Exchange (ETDEWEB)

    Fredriksen, R.; Katta, V.; Raspotnig, C. [Institutt for energiteknikk (IFE) (Norway); Valkonen, J. [Technical Research Centre of Finland (VTT) (Finland)

    2008-03-15

    This report documents the work and related activities of the MORE project in the period January 1 - December 31 in 2007. The focus of this report is on improvements of the former project results, to identify and apply a couple of case studies from NPP projects, and activities in order to initiate and implement the industrial take-up and utilisation of the research results in real modernisation projects. The report also provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  11. Summary report of the second research co-ordination meeting on improvement of the standard cross sections for light elements

    International Nuclear Information System (INIS)

    Carlson, A.D.; Hale, G.M.; Pronyaev, V.G.

    2004-03-01

    Results are presented following one and a half years of work under the Coordinated Research Project (CRP) on Improvement of the Standard Cross Sections for Light Elements. They include the use of the refined resonating group model for the theoretical prediction of the R-matrix poles and preliminary R-matrix model fits of the full experimental database for the 6 Li+n system obtained with different codes. Significant attention was paid to the exclusion of the bias in the evaluated data caused by the possible presence of Peelle's Pertinent Puzzle effect in the experimental data. Updates were also presented of the experimental database for light and heavy element standards including fission cross sections up to 200 MeV. First results and observed trends for all standard reactions are given, including the preliminary results of combining the model (for light elements) and non-model fits. The timetable for further work was agreed, which should lead to new reaction cross section standards for light and heavy elements by the end 2004. (author)

  12. Downplaying model power in IT project work

    DEFF Research Database (Denmark)

    Richter, Anne; Buhl, Henrik

    2004-01-01

    in the research, presented in this article, conducted in a Danish manufacturing company, is how an IT system could be configured to support shopfloor teamwork and enhance the quality of work. The approach is based on participatory design and the concept of "model power". This concept facilitates an understanding...

  13. AVLIS Production Plant work breakdown structure and Dictionary

    International Nuclear Information System (INIS)

    1984-01-01

    The work breakdown structure has been prepared for the AVLIS Production Plant to define, organize, and identify the work efforts and is summarized in Fig. 1-1 for the top three project levels. The work breakdown structure itself is intended to be the primary organizational tool of the AVLIS Production Plant and is consistent with the overall AVLIS Program Work Breakdown Structure. It is designed to provide a framework for definition and accounting of all of the elements that are required for the eventual design, procurement, and construction of the AVLIS Production Plant. During the present phase of the AVLIS Project, the conceptual engineering phase, the work breakdown structure is intended to be the master structure and project organizer of documents, designs, and cost estimates. As the master project organizer, the key role of the work breakdown structure is to provide the mechanism for developing completeness in AVLIS cost estimates and design development of all hardware and systems. The work breakdown structure provides the framework for tracking, on a one-to-one basis, the component design criteria, systems requirements, design concepts, design drawings, performance projections, and conceptual cost estimates. It also serves as a vehicle for contract reporting. 12 figures, 2 tables

  14. Nuclear Safety Project. Annual report 1983

    International Nuclear Information System (INIS)

    1984-06-01

    The annual report 1983 is a detailed description (in German language) of work within the Nuclear Safety Project performed in 1983 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on work performed, results obtained and plans for future work. This report was compiled by the project management. (orig.) [de

  15. Nuclear safety project. Annual report 1985

    International Nuclear Information System (INIS)

    1986-07-01

    The annual report 1985 is a detailed description (in German language) of work within the nuclear safety project performed in 1985 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on work performed, results obtained and plans for future work. This report was compiled by the project management. (orig./HP) [de

  16. CTOs at work

    CERN Document Server

    Donaldson, Scott; Donaldson, Gary

    2012-01-01

    Scott Donaldson, Stanley Siegel and Gary Donaldson interview many of the world's most influential chief technology officers in CTOs at Work, offering a brand-new companion volume to the highly acclaimed elite At Work books including Coders at Work, CIOS at Work and Venture Capitalists at Work. As the words "at work" suggest, the authors focus on how their interviewees tackle the day-to-day work of the CTO while revealing much more: how they got there, how they manage and allocate projects, and how they interact with business units and ensure that their companies take advantage of technologies,

  17. Application of demography to energy facility development projects. Working Paper No. 39

    International Nuclear Information System (INIS)

    Krannich, R.S.; Stanfield, G.G.

    1977-01-01

    The emergence of concern regarding socioeconomic consequences of large-scale development projects has resulted in a growing literature directed as estimating the types and levels of various impact dimensions which can be expected to result in human communities experiencing such development. Among these dimensions, a focus on population change has been prevalent. Accurate demographic predictions may be viewed as critical for the adequate comprehension of and preparation for impacts deriving from projects such as energy facility developments. Unfortunately, the state of the art in projecting demographic consequences of energy projects has been generally inadequate. Several of the more influential prior methods for estimating local demographic effects of developing energy facilities are critiqued, although their specific prediction figures are not summarized. The studies reviewed were found to be of dubious practical utility, probably due in part to the failure of basic demography to provide a base of support for applied demographic research. This report sets forth recommendations for the development of a theoretical perspective which would more adequately serve the needs of practitioners attempting to predict local demographic effects of energy facility development

  18. Fourth natural analogue working group meeting and Pocos de Caldas project final workshop

    International Nuclear Information System (INIS)

    Come, B.; Chapman, N.A.

    1991-01-01

    The fourth meeting of the CEC-sponsored natural analogue working group (NAWG) was held in Pitlochry, Scotland, from 18 to 22 June 1990, and also included the final workshop of the Pocos de Caldas (Brazil) natural analogue project, sponsored by Nagra (CH), SKB (S) UK-DOE and US-DOE. About 80 specialists attended this meeting, originating from EC Member States and also Australia, Brazil, Canada, Finland, Japan, Sweden, Switzerland and the USA. The IAEA and OCDE-NEA were also represented. This plenary meeting was the opportunity to review and discuss five years of progress and activities of natural analogues in central areas of performance assessment: waste forms and engineered barriers, geochemistry and radionuclide speciation, radionuclide migration and the overall geological context of radwaste disposal. In addition, a feedback session provided the opportunity for regulators and those individuals who had advisory roles to give their views and impressions on the significance of natural analogue research. These proceedings, divided into two sessions, contain 32 technical papers and 14 abstracts of published papers

  19. Work Begins at School.

    Science.gov (United States)

    Casto, James E.

    2001-01-01

    Students at Clay County High School (West Virginia) get real-world work experience through the school's comprehensive School-to-Work program, now in its third year. Given the limited job availability in this poor rural area, the school supplements work-site experiences with school-based business enterprises, student construction projects, and…

  20. Bulletin timetable for 2010

    CERN Multimedia

    CERN Bulletin

    2009-01-01

    The table below lists the 2010 publication dates for the paper version of the Bulletin and the corresponding deadlines for the submission of announcements. Please note that all announcements must be submitted by 12.00 midday on Tuesdays at the latest. Bulletin No. Week number Submission of announcements (before 12.00 midday) Bulletin Web version Bulletin Paper version 2-3 Tuesday 5 January Friday 8 and 15 January Wednesday 13 January 4-5 Tuesday 19 January Friday 22 and 29 January Wednesday 27 January 6-7 Tuesday 2 February Friday 5 and 12 february Wednesday 10 February 8-9 Tuesday 16 February Friday 19 and 26 February ...