WorldWideScience

Sample records for project team focused

  1. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  2. Project-focused activity and knowledge tracker: a unified data analysis, collaboration, and workflow tool for medicinal chemistry project teams.

    Science.gov (United States)

    Brodney, Marian D; Brosius, Arthur D; Gregory, Tracy; Heck, Steven D; Klug-McLeod, Jacquelyn L; Poss, Christopher S

    2009-12-01

    Advances in the field of drug discovery have brought an explosion in the quantity of data available to medicinal chemists and other project team members. New strategies and systems are needed to help these scientists to efficiently gather, organize, analyze, annotate, and share data about potential new drug molecules of interest to their project teams. Herein we describe a suite of integrated services and end-user applications that facilitate these activities throughout the medicinal chemistry design cycle. The Automated Data Presentation (ADP) and Virtual Compound Profiler (VCP) processes automate the gathering, organization, and storage of real and virtual molecules, respectively, and associated data. The Project-Focused Activity and Knowledge Tracker (PFAKT) provides a unified data analysis and collaboration environment, enhancing decision-making, improving team communication, and increasing efficiency.

  3. Team effectiveness in Non-Governmental Organizations (NGOs) projects.

    Science.gov (United States)

    Latif, Khawaja Fawad; Williams, Nigel

    2017-10-01

    The incorporation of team context into research and practice regarding team effectiveness in NGOs projects is a constant challenge. The research seeks to address the gap and identify the critical determinants of team effectiveness in projects undertaken by non-governmental organizations. Using a systematic process, the study involved both literature and focus group discussions to generate the required items. A total of 157 respondents (Team Members and Team Leaders) were part of the study that filled the questionnaires. Using exploratory factor analysis followed by confirmatory factor analysis, both convergent and discriminant validity was established. The present study found that team effectiveness in NGO social projects has a total of seven dimensions namely: Inter team coordination, community social linkage, team performance, knowledge, skills, and attitudes, leadership communication and engagement, decision making and information sharing, and team formation. There is a significant lack of research on team effectiveness in NGO projects. Where considerably large proportion of research on team effectiveness has focused on the corporate sector, the non-governmental teams have been neglected. This study clearly highlights the determinants that make up team effectiveness in NGOs. The determinants identified will help to specifically look at the effectiveness of teams in NGO projects. The study would help NGOs identify the dimensions in which they may be performing in a weaker manner and direct their energies in improving the factors. Copyright © 2017 Elsevier Ltd. All rights reserved.

  4. Creating a Realistic Context for Team Projects in HCI

    NARCIS (Netherlands)

    Koppelman, Herman; van Dijk, Betsy

    2006-01-01

    Team projects are nowadays common practice in HCI education. This paper focuses on the role of clients and users in team projects in introductory HCI courses. In order to provide projects with a realistic context we invite people from industry to serve as clients for the student teams. Some of them

  5. Team-Based Learning for Nursing and Medical Students: Focus Group Results From an Interprofessional Education Project.

    Science.gov (United States)

    Feather, Rebecca A; Carr, Doug E; Reising, Deanna L; Garletts, Derrick M

    2016-01-01

    Past research indicates that inadequacies in health care delivery create substantial preventable quality issues that can be addressed through improving relationships among clinicians to decrease the negative effects on patient outcomes. The purpose of this article is to describe the implementation of an interprofessional education project with senior nursing and third-year medical students working in teams in a clinical setting. Results include data from focus groups conducted at the conclusion of the project.

  6. Relationships among Team Trust, Team Cohesion, Team Satisfaction and Project Team Effectiveness as Perceived by Project Managers in Malaysia

    OpenAIRE

    Han-Ping Fung

    2014-01-01

    Today, more and more project teams are formed to achieve organizational objectives as organizations generally recognized the importance and benefits of project teams. There is a compelling reason to study what are the team outcome factors that can predict project team effectiveness as it is unclear whether these team outcome factors can yield the same result in project setting whereby there is resource and time constraint compare to normal work teams which are ongoing and operational in natur...

  7. Intercultural team maturity model: Unity, diversity, capability. Achieving optimal performance when leading \\ud a multicultural project team

    OpenAIRE

    Prabhakar, G. P.; Walker, S.

    2005-01-01

    Our research helps to judge ‘maturity’ as an asset to projects and heightens awareness of situational leadership, using intercultural team maturity levels as a tool for optimal project leadership success.\\ud \\ud This study focuses on exactly how to analyse the team members’ ability to adapt to complex intercultural project environments, using an intercultural team maturity model.

  8. A Project Team: a Team or Just a Group?

    Directory of Open Access Journals (Sweden)

    Kateřina

    2014-06-01

    Full Text Available This paper deals with issues related to work in either teams or groups. The theoretical part discusses a team and a group with regards to its definition, classification and basic distinction, brings in more on the typology of team roles, personality assessment and sociometric methods. The analytical part tests the project (work team of a medical center represented in terms of personality and motivational types, team roles and interpersonal team relations concerning the willingness of cooperation and communication. The main objective of this work is to verify the validity of the assumptions that the analyzed team represents a very disparate group as for its composition from the perspective of personality types, types of motivation, team roles and interpersonal relations in terms of the willingness of cooperation and communication. A separate output shall focus on sociometric investigation of those team members where willingness to work together and communicate is based on the authors’ assumption of tight interdependence.

  9. Building Productivity in Virtual Project Teams

    Directory of Open Access Journals (Sweden)

    Bill Hamersly

    2015-04-01

    Full Text Available The steady increase in project failure rates is leaving businesses searching for better integration techniques to virtualize their project environments. Through virtualization, organizations may have positive impacts on communities across geographical boundaries and resource constraints. The focus of this phenomenological study was to explore, via the experiences of successful project management practitioners, best practice strategies for integrating virtual project teams through data analysis. The conceptual framework included von Bertalanffy’s general systems theory, decomposition model of business process and project management frameworks, and the recomposition approach. Twenty-two senior project managers with more than 5 years of experience managing virtual project environments participated in semistructured telephone interviews. The van Kaam process employing normalization and bracketing approaches in data analysis resulted in the emergence of 34 thematic categories. The 10 most common themes culminated in the identification of strategies relevant for virtual project teams. The major themes pertained to 3 broad areas: (a structure that accommodates skills and technology for virtual team success, (b governance leading to efficient virtual project team management, and (c collaboration practices across diverse environments. This study involved the exploration of the experiences of the participants. Using the van Kaam method for normalization of the data and clustering like experiences into thematic statements, the study provided a plethora of new information concentrated on 10 themes that emerged.

  10. First, build the project team

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, J.C. [Duke/Fluor Daniel, Charlotte, NC (United States)

    1997-03-01

    The EPC consortium of American, Japanese and Indonesian companies has been formed to construct the first phase of the coal-fired Paiton Power Project in Indonesia under a lump sum turnkey contract. A Consortium Agreement defines the respective roles, scope and responsibilities, as well as allocation of risks and rewards for each member. The roles of members have been assigned to match their experience and expertise and a Division of Responsibility document has been drawn up for each stage of the project. The management of the project depends on an effective team aligning the consortium members to a common set of project goals and objectives. Communication and understanding are all important. The project team have overcome some of the challenges of differences in culture, language, contractual practice and experience between the members. Some of the systems which are in place to minimise the effect of these differences and to focus on the execution of the project are outlined. (UK)

  11. Project Management with IT Security Focus

    OpenAIRE

    Felician Alecu; Paul Pocatilu; Sergiu Capisizu

    2011-01-01

    The paper focus on the main key points related to the IT security project management. The most important lifecycle stages are identified: IT security project proposal definition, project organization, project planning, quality planning, project team organization, IT security project activities management and project closing. The most important success factors for IT security projects are the support of top-management, customer satisfaction, prevention over remediation and continuous progress....

  12. Sourcing Team Behavior in Project-Based MNE's

    DEFF Research Database (Denmark)

    Hansen, Anders Peder Lysholm

    2014-01-01

    across the three cases was characterized by conflict between departments represented in the category teams. This resulted in unfortunate sourcing team behaviour and unaligned performance management, which in turn had a number of adverse effects. Further research on how to create a holistic and balanced......This paper presents and discusses a multiple case study of three cross-functional category teams responsible for sourcing critical components within multi-national, project-based enterprises. The study focused on behaviour and management of the sourcing teams and found that the sourcing process...... team perspective in the sourcing teams is suggested....

  13. Team work on international projects

    International Nuclear Information System (INIS)

    Hayfield, F.

    1983-01-01

    A successful team will result in Project efficiency and so lead to a better achievement of the Project objectives. Such a team will be self-motivating and have a high level of morale. An effective team will also create a better context for transfer of know-how and so better prepare its members for greater roles on future Project teams. The nature of Project work forces the process of team building to recognize several facts of life. A Project team can have a life as short as one year and as long as ten years. A team usually consists of people on temporary transfer from different departments yet retaining a link of some sort to their departments of origin. It may consist of members of one company only or of several as in a joint-venture and may include Client personnel. On International Projects, the members of a team may have different nationalities and be working in a language foreign to many of them. Many of the Project people may be expatriates to the Project area on a bachelor or on a married status well away from their head or usual office. Team building is a complex organizational and human process, with no mathematical formula for the ideal solution. It starts with the selection of the right Project Manager who should be a leader, a technocrat manager and an integrator all at the same time. The Project Manager must have the authority to create the organizational and human climate that will motivate to a maximum each member of the team. Each member must understand clearly his role and realize that this contribution to the Project will influence his career development. Loyalty to the Project Manager must be possible and the Departmental Manager has to recognize this necessity. This presentation will indicate the basic steps of a team building process on a typical major international Project

  14. Virtual Project Teams

    DEFF Research Database (Denmark)

    Bjørn, Pernille

    technology in six real-life virtual teams, two in industry and four in education, applying interpretative research and action research methods. Two main lines of investigation are pursued: the first involves an examination of the organisational issues related to groupware adaptation in virtual project teams......, professional disciplines, time differences and technology. This thesis comprises a general introduction, referred to as the summary report, and seven research papers, which deal in detail with the results and findings of the empirical cases. The summary report provides a general introduction to the research......, while the second looks at the social context and practices of virtual project teams. Two of the key findings are 1) that the process of groupware adaptation by virtual project teams can be viewed as a process of expanding and aligning the technological frames of the participants, which includes mutual...

  15. Perspectives on projects, project success and team work

    OpenAIRE

    Thompson, Karen

    2015-01-01

    This paper brings together perspectives on projects, project success and team work as a background to two graphical tools for considering project success and individual capabilities for working in a project team.

  16. The Use of Virtual Project Teams for Project Management in Jordanian Corporations

    Directory of Open Access Journals (Sweden)

    Belal Hashem Alnsour

    2014-09-01

    Full Text Available Jordanian companies need virtual project teams that can use advanced technology to solve problems and make specialist multi perspective decisions when working across different and distance location. The main mission of the team is to make decisions through interdependent specialists and perspectives. In terms of its use and application, the virtual project team is a difficult challenge for Jordan corporations. This study aims to explore such applications and to detect which factors face virtual project teams in the Jordanian situation. The author focused on how to explore and gain a deeper understanding from a virtual team’s perspective, and team members’ opinions of the factors in the organization that support or hinder the mission. More specifically, this research sought to discover precisely which factors in an organization support virtual project teams, and how they can develop a support system which enables their work in an Arab environment. The main objective was to identify the effects of all factors on the efficiency of virtual teams. The research used empirical case studies from three Jordanian corporations in the communication sector which operate in a high-tech environment, and used surveys to collect data. Structured interviews with both management and team members during the study discovered that the use of virtual teams within Jordanian companies is still limited, and detected that the main factors which hinder their development in many corporations is the level of trust in the ability of virtual teams, together with the high level of centralized decision making in Jordanian corporations. Additionally, communication and coordination affect the execution of work processes and methods for virtual teams, together with a general weakness which exists in terms of infrastructure, resources and technology within the corporation, which then impacts on the efficiency of virtual team work.

  17. Successful project teams (in R&D environment)

    CSIR Research Space (South Africa)

    Giesler, Achmed

    2011-09-01

    Full Text Available management tools no longer give project teams a competitive edge - additional qualitative tools are required, following a systems approach. A paradigm shift away from the traditional triangle of budget, brief and time towards a stronger focus on people issues...

  18. Managing projects a team-based approach

    CERN Document Server

    Brown, Karen A

    2010-01-01

    Students today are likely to be assigned to project teams or to be project managers almost immediately in their first job. Managing Projects: A Team-Based Approach was written for a wide range of stakeholders, including project managers, project team members, support personnel, functional mangers who provide resources for projects, project customers (and customer representatives), project sponsors, project subcontractors, and anyone who plays a role in the project delivery process. The need for project management is on the rise as product life cycles compress, demand for IT systems increases, and business takes on an increasingly global character. This book adds to the project management knowledge base in a way that fills an unmet need—it shows how teams can apply many of the standard project management tools, as well as several tools that are relatively new to the field. Managing Projects: A Team-Based Approach offers the academic rigor found in most textbooks along with the practical attributes often foun...

  19. Team structure and regulatory focus: the impact of regulatory fit on team dynamic.

    Science.gov (United States)

    Dimotakis, Nikolaos; Davison, Robert B; Hollenbeck, John R

    2012-03-01

    We report a within-teams experiment testing the effects of fit between team structure and regulatory task demands on task performance and satisfaction through average team member positive affect and helping behaviors. We used a completely crossed repeated-observations design in which 21 teams enacted 2 tasks with different regulatory focus characteristics (prevention and promotion) in 2 organizational structures (functional and divisional), resulting in 84 observations. Results suggested that salient regulatory demands inherent in the task interacted with structure to determine objective and subjective team-level outcomes, such that functional structures were best suited to (i.e., had best fit with) tasks with a prevention regulatory focus and divisional structures were best suited to tasks with a promotion regulatory focus. This contingency finding integrates regulatory focus and structural contingency theories, and extends them to the team level with implications for models of performance, satisfaction, and team dynamics.

  20. Planning for high performance project teams

    International Nuclear Information System (INIS)

    Reed, W.; Keeney, J.; Westney, R.

    1997-01-01

    Both industry-wide research and corporate benchmarking studies confirm the significant savings in cost and time that result from early planning of a project. Amoco's Team Planning Workshop combines long-term strategic project planning and short-term tactical planning with team building to provide the basis for high performing project teams, better project planning, and effective implementation of the Amoco Common Process for managing projects

  1. Defining Projects to Integrate Evolving Team Fundamentals and Project Management Skills

    Science.gov (United States)

    Smith, Harold, III; Smarkusky, Debra; Corrigall, Elizabeth

    2008-01-01

    Industry has indicated the desire for academic programs to produce graduates that are well-versed in collaborative problem solving and general project management concepts in addition to technical skills. The primary focus of a curriculum is typically centered on the technical training with minimal attention given to coalescing team and project…

  2. Cultural Issue and its Influence in the Management of Global Project Teams

    Directory of Open Access Journals (Sweden)

    Nadia Lima

    2016-04-01

    Full Text Available The interactions between the project manager and team members may be affected by several variables, such as culture, leadership style of the project manager, and the complexity of the developed tasks. Focused in this context, the objective of this paper is to investigate and describe how the culture issue can affect the anagement of global project teams. It is a qualitative, descriptive study conducted in a large multinational company in the automotive sector. The results of this research show that cultural issues can influence both positively and negatively the management of project global teams and the managers of these projects have to deal with several management challenges that require the adoption of certain ways of dealing with culture impacts in managing their teams to minimize potential problems in this context.

  3. The Project Team: Features, Effectiveness and Leadership

    Directory of Open Access Journals (Sweden)

    Ramona-Elena GABREA

    2017-06-01

    Full Text Available The project team that is responsible for providing flexibility and innovation to this structure in order to enable organizations to remain successful (1. The very nature of the project team's work underpins a collective task much more complex than that assumed by other types of work teams. The aim of this paper is to explore the main factors that determine the project team effectiveness. The research methodology was the literature review. The main finding reveals that the organizational structure of projects and the project team should not be considered as a panacea for all problems of organizational effectiveness.

  4. 33 CFR 385.17 - Project Delivery Team.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Delivery Team. 385.17... Processes § 385.17 Project Delivery Team. (a) In accordance with the procedures of the Corps of Engineers...,” the Corps of Engineers and the non-Federal sponsor shall form a Project Delivery Team to develop the...

  5. Initial evaluation of the effects of an environmental-focused problem-solving intervention for transition-age young people with developmental disabilities: Project TEAM.

    Science.gov (United States)

    Kramer, Jessica M; Helfrich, Christine; Levin, Melissa; Hwang, I-Ting; Samuel, Preethy S; Carrellas, Ann; Schwartz, Ariel E; Goeva, Aleksandrina; Kolaczyk, Eric D

    2018-03-12

    Project TEAM (Teens making Environment and Activity Modifications) teaches transition-age young people with developmental disabilities, including those with co-occurring intellectual or cognitive disabilities, to identify and resolve environmental barriers to participation. We examined its effects on young people's attainment of participation goals, knowledge, problem-solving, self-determination, and self-efficacy. We used a quasi-experimental, repeated measures design (initial, outcome, 6-week follow-up) with two groups: (1) Project TEAM (28 males, 19 females; mean age 17y 6mo); and (2) goal-setting comparison (21 males, 14 females; mean age 17y 6mo). A matched convenience sample was recruited in two US states. Attainment of participation goals and goal attainment scaling (GAS) T scores were compared at outcome. Differences between groups for all other outcomes were analyzed using linear mixed effects models. At outcome, Project TEAM participants demonstrated greater knowledge (estimated mean difference: 1.82; confidence interval [CI]: 0.90, 2.74) and ability to apply knowledge during participation (GAS: t[75]=4.21; CI: 5.21, 14.57) compared to goal-setting. While both groups achieved significant improvements in knowledge, problem-solving, and self-determination, increases in parent reported self-determination remained at 6-week follow-up only for Project TEAM (estimated mean difference: 4.65; CI: 1.32, 7.98). Significantly more Project TEAM participants attained their participation goals by follow-up (Project TEAM=97.6%, goal-setting=77.1%, p=0.009). Both approaches support attainment of participation goals. Although inconclusive, Project TEAM may uniquely support young people with developmental disabilities to act in a self-determined manner and apply an environmental problem-solving approach over time. Individualized goal-setting, alone or during Project TEAM (Teens making Environment and Activity Modifications) appears to support attainment of participation

  6. Defensive behaviours in innovation teams: how project teams discuss defensiveness and its relationship with innovation resilience behaviour and project success

    NARCIS (Netherlands)

    Oeij, P.R.A.; Dhondt, S.; Gaspersz, J.B.R.; Vuuren, T. van

    2016-01-01

    Project team members and project leaders of innovation projects were interviewed about the possible presence of defensive behaviours within the team. While investigating defensive behaviour can be done validly by observation techniques, to talk about defensiveness within a team often leads to

  7. A Project Team: A Team or Just a Group?

    Directory of Open Access Journals (Sweden)

    Katerina Hrazdilova Bockova

    2013-11-01

    Full Text Available This paper deals with issues related to work in either teams or groups. The theoretical part which discusses a team and a group with regards to its definition, classification and basic distinction brings in more on the typology of team roles, personality assessment and sociometric methods. The analytical part tests the project (work team of a medical center represented in terms of personality and motivational types, team roles and interpersonal team relations concerning the willingness of cooperation and communication. The main objective of this work was to determine whether the existing team is not by its nature rather a working group that contributes to the generally perceived stagnation of that field.

  8. Involving youth with disabilities in the development and evaluation of a new advocacy training: Project TEAM.

    Science.gov (United States)

    Kramer, Jessica; Barth, Yishai; Curtis, Katie; Livingston, Kit; O'Neil, Madeline; Smith, Zach; Vallier, Samantha; Wolfe, Ashley

    2013-04-01

    This paper describes a participatory research process in which six youth with disabilities (Youth Panel) participated in the development and evaluation of a manualized advocacy training, Project TEAM (Teens making Environment and Activity Modifications). Project TEAM teaches youth with disabilities how to identify environmental barriers, generate solutions, and request accommodations. The Youth Panel conducted their evaluation after the university researcher implemented Project TEAM with three groups of trainees. The Youth Panel designed and administered a survey and focus group to evaluate enjoyment and usefulness of Project TEAM with support from an advocate/researcher. Members of the Youth Panel analyzed survey response frequencies. The advocate/researcher conducted a content analysis of the open-ended responses. Sixteen of 21 Project TEAM trainees participated in the evaluation. The evaluation results suggest that the trainees found the interactive and individualized aspects of the Project TEAM most enjoyable and useful. Some instructional materials were difficult for trainees with cognitive disabilities to understand. The Youth Panel's involvement in the development of Project TEAM may explain the relatively positive experiences reported by trainees. Project TEAM should continue to provide trainees with the opportunity to apply concepts in real-life situations. Project TEAM requires revisions to ensure it is enjoyable and useful for youth with a variety of disabilities. • Group process strategies, picture-based data collection materials, peer teamwork, and mentorship from adults with disabilities can enable youth with disabilities to engage in research. • Collaborating with youth with disabilities in the development of new rehabilitation approaches may enhance the relevance of interventions for other youth with disabilities. • Youth with cognitive disabilities participating in advocacy and environment-focused interventions may prefer interactive and

  9. Misery loves company: team dissonance and the influence of supervisor-focused interpersonal justice climate on team cohesiveness.

    Science.gov (United States)

    Stoverink, Adam C; Umphress, Elizabeth E; Gardner, Richard G; Miner, Kathi N

    2014-11-01

    The organizational justice literature has examined the effects of supervisor-focused interpersonal justice climate, or a team's shared perception of the dignity and respect it receives from its supervisor, on a number of important outcomes directed at organizational authorities. Considerably less is known about the potential influence of these shared perceptions on coworker-directed outcomes. In 2 experiments, we predict that a low (unfair) supervisor-focused interpersonal justice climate generates greater team cohesiveness than a high (fair) supervisor-focused interpersonal justice climate. We further examine the process through which this effect occurs. Drawing from cognitive dissonance theory, we predict that low (vs. high) supervisor-focused interpersonal justice climate generates greater team dissonance, or shared psychological discomfort, for team members and that this dissonance serves as an underlying mechanism through which supervisor-focused interpersonal justice climate influences a team's cohesiveness. Our results demonstrate support for these predictions in that low supervisor-focused interpersonal justice climate led to higher levels of both team dissonance and team cohesiveness than did high supervisor-focused interpersonal justice climate, and team dissonance mediated this relationship. Implications and areas for future research are discussed. (PsycINFO Database Record (c) 2014 APA, all rights reserved).

  10. A new approach to cost effective projects: High performance project teams

    International Nuclear Information System (INIS)

    Chambers, N.C.

    1994-01-01

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  11. A new approach to cost effective projects: High performance project teams

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, N.C. [Brown and Root Energy Services (United Kingdom)

    1994-12-31

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  12. Is it already 4 a.m. in your time zone? : focus immersion and temporal dissociation in virtual teams

    NARCIS (Netherlands)

    Rutkowski, A.F.; Saunders, C.; Vogel, D.R.; Genuchten, van M.J.I.M.

    2007-01-01

    Using a sample of students (N = 118) engaged in an 8-week project to build an e-book chapter, this study finds that cognitive absorption impacts interpersonal conflict and team performance. In particular, virtual teams with aggregated higher levels of focus immersion and temporal dissociation

  13. A team leadership approach to managing the transition from construction to operations for an environmental project

    International Nuclear Information System (INIS)

    Kelly, J.W.

    1994-06-01

    This presentation describes a team approach, at the totalproject level that focused team members with common objectives, for the transition to start-up and operation of the project. The Integrated Management Team (IMT) approach has been successful for this US Department of Energy (DOE) environmental restoration project at the Hanford Site in Richland, Washington. The $53.8-million project will collect, treat, and dispose of low-level mixed waste water discharges from the Hanford Site. Construction is scheduled for completion in September 1994 and facility start-up in June 1995. The project challenge is for leadership that is committed to the transition from construction to operation of the environmental restoration project

  14. Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode

    Science.gov (United States)

    Zhang, L.; Li, Y.; Wu, Q.

    2013-05-01

    Integrated Project Delivery (IPD) is a newly-developed project delivery approach for construction projects, and the level of collaboration of project management team is crucial to the success of its implementation. Existing research has shown that collaborative satisfaction is one of the key indicators of team collaboration. By reviewing the literature on team collaborative satisfaction and taking into consideration the characteristics of IPD projects, this paper summarizes the factors that influence collaborative satisfaction of IPD project management team. Based on these factors, this research develops a fuzzy linguistic method to effectively evaluate the level of team collaborative satisfaction, in which the authors adopted the 2-tuple linguistic variables and 2-tuple linguistic hybrid average operators to enhance the objectivity and accuracy of the evaluation. The paper demonstrates the practicality and effectiveness of the method through carrying out a case study with the method.

  15. Towards Integrated Team Practice: A Case of Malaysian Industrialised Building System (IBS Construction Projects

    Directory of Open Access Journals (Sweden)

    Mohd Nawi Mohd Nasrun

    2014-01-01

    Full Text Available Problems associated with fragmentation in the traditional construction process, such as isolation of professionals, lack of co-ordination between design and construction, and the sequential manner of its processes, has impacted on construction performance leading to a lack of integration, wastage, low productivity and efficiency. Integrated team practice is perceived as paramount. Unfortunately, there has a limitation of study focus on the dimension of fully integrated team especially for Malaysian Industrialised Building System (IBS projects. Accordingly, this research paper explores and identifies the dimension of fully integrated team from the traditional approach and conduct a validation process for implementing it in Malaysian IBS projects. The research presented uses interviews case study to obtain qualitative data. It was found that the dimension of fully integrated team from the traditional construction process could apply to the Malaysian IBS projects. Suggestions on how an integrated team practice in IBS design and construction process in order to minimise the fragmentation gaps will be concluded.

  16. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  17. The international INTRAVAL project. Summary and conclusions by the TVO/VTT Team

    International Nuclear Information System (INIS)

    Hautojaervi, A.

    1994-12-01

    Teollisuuden Voima Oy (TVO) participated the international cooperation project INTRAVAL and VTT Energy acted as a project team. The Finnish participation focused on flow and transport in crystalline fractured rock and six test cases out of thirteen were tackled. The experimental results were evaluated mainly by means of analytical transport models. The report presents a short review of the experience obtained in the course of the project. It concentrates on the issues revealed in the discussions and analyses of the six test cases in which the TVO/VTT team actively participated but some of the conclusions are even more general in nature. Some suggestions are made for future experimental and theoretical work in the field of geosphere. (15 refs., 2 tabs.)

  18. LEADERSHIP AS A FACTOR FOR BUILDING A PROJECT TEAM

    Directory of Open Access Journals (Sweden)

    Marina Grynchenko

    2018-03-01

    Full Text Available The subject matter of the article is to determine the role of leadership for building a project team as the team quality and the professionalism of the team participants play a key role in ensuring the proper work performance that is specified by the tasks of the project. The goal of the article is to reveal the significance of the capability of a leader to build a project team and to develop in it a favorable psychological climate, common values and ideals and show the place of this capability in the general system of the leader’s behavioural competences, that is to justify the importance of this skill and its application to increase the effectiveness of the impact of leadership on the project team. The objectives of the study involve  - identifying a project team as a complex social organism where highly qualified people perform a specific set of functions; - emphasizing the fact that different individual features and qualities of participants greatly complicate the process of building a project team as well as  coordinating the goals, aspirations and interests of team participants. Besides, the students who study Project Management should be familiarized with the methods of acquiring the knowledge and developing skills necessary for building a team. The methods of the study involve the analysis of the role of motivation in the process of team building since while building a team the leader has to solve many problems and the issues of motivation are among them. Second, the character of relations among the participants and the rational organization of their efficient teamwork should be analyzed. Third, the analysis of the leader’s capability to foster the professional and personal development of the participants in the teamwork is of great importance. Fourth, the effective method of cultivating in leaders the skills of building a team is increasing the level of teaching behavioural competences using innovative pedagogical techniques

  19. Knowledge management in design teams using a project website

    OpenAIRE

    Otter, den, A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for sharing of knowledge in such teams are hard to change and better systems are difficult to implement for various reasons. Sharing of knowledge in such teams is important for collective understanding of ...

  20. Using Agile Project Management to Enhance the Performance of Instructional Design Teams

    Science.gov (United States)

    Sweeney, David S.; Cifuentes, Lauren

    2010-01-01

    Instructional design models describe in detail methodologies for designing effective instruction. Several widely adopted models include suggestions for managing instructional design projects. However, these suggestions focus on how to manage the instructional design steps rather than the instructional design and development team process. The…

  1. Students’ Team Project Experiences and Their Attitudes Towards Teamwork

    Directory of Open Access Journals (Sweden)

    Aleksandra Rudawska

    2017-03-01

    Full Text Available Purpose: The aim of the study is to evaluate the influence of team project experiences of students (presence and role of a leader; fairness in team projects; conditions supporting teamwork created by a university on their attitudes towards teamwork, especially the perception of teamwork effectiveness and the preference of working in teams. Methodology: In the study the quantitative research was done among master degree Polish students of Management (105 questionnaires. The measures used for the study were developed specifcally for the study referring to the previous research in the feld. Findings: Results indicate that leaders in team projects and conditions supporting teamwork are connected with the students’ perception of teamwork effectiveness, while the fairness in team projects is connected with students’ preference of working collectively. Research implications: We conclude that in order to develop a positive attitude towards teamwork, the teamwork projects should be better supported by the instructors (especially supporting the emergence of leader(s and minimising the problem of free riders and the university should create a climate that facilitates teamworking, otherwise team projects might negatively influence students’ attitude towards collective work. Value: On the labour market the teamwork skills are one of the most important skills of employees, as the team-based organizational designs are becoming the norm in work organization. The study is contributing to the understanding of the relations between student experiences and their attitudes as well as the role played by high education in the development of these attitudes. Some previous research in Anglo-Saxon culture countries indicate that team project assignments realised by students during studies might even hinder their attitudes to teamwork and their willingness to work in teams in the future.

  2. Dream Team - A pregraduate surgical talent development project

    DEFF Research Database (Denmark)

    Jensen, Rune Dall; Seyer-Hansen, Mikkel; Christensen, Mette Krogh

    Dream Team is an extracurricular pregraduate surgical talent development project founded in 2009 at Aarhus University Hospital, Denmark. It aims to identify and develop laparoscopic surgical talents during medical school. Dream Team contains two parts: 1) a weeklong boot camp where app. 10 % of 8th...... the mentorship the students will be in operation room at least once a week and participate as much as their skills allow. Dream Team differs from similar pregraduate programs as it selects the most talented students, but does the boot camp select the best and does the mentorship program provide optimal learning......? A PhD project aims to critically analyze and develop Dream Team. The PhD project is based on theories about deliberate practice[1] and social learning[2]. In addition, we compare surgical talent development[3][4] with talent development in elite sport in order to inspire, refine and develop Dream Team...

  3. Does team stability mediate the relationship between leadership and team learning? An empirical study among Dutch project teams

    NARCIS (Netherlands)

    Savelsbergh, Chantal M.J.H.; Poell, Rob F.; van der Heijden, Beatrice

    2014-01-01

    An exploratory field study was conducted among 30 project teams in the sectors of building and utilities, engineering and construction, infrastructure, and area decontamination and development in the Netherlands. It examined the influence of leadership on team learning behaviors and included team

  4. Does team stability mediate the relationship between leadership and team learning? : An empirical study among Dutch project teams

    NARCIS (Netherlands)

    Savelsbergh, C.; Poell, R.F.; van der Heijden, B.

    2015-01-01

    An exploratory field study was conducted among 30 project teams in the sectors of building and utilities, engineering and construction, infrastructure, and area decontamination and development in the Netherlands. It examined the influence of leadership on team learning behaviors and included team

  5. A multilevel study of the impact of project manager's leadership on extra-role performance of project team members

    Science.gov (United States)

    Shokory, Suzyanty Mohd; Suradi, Nur Riza Mohd

    2018-04-01

    The current study examines the impact of transformational and transactional leadership of project manager on the extra-role performance of project team members. In addition, this study also identifies factor dominant to extra-role performance of project team members when the transformational and transactional leadership of project managers are analyzed simultaneously. The study involved 175 of project team members from 35 project teams (each project team consists of different contracting companies registered in the Selangor (N = 175 from 35 contractors company). A multilevel analysis with hierarchical linear modeling (HLM) approach was used in this study. The analysis showed that transformational and transactional leadership of the project manager is a positive significant with extra-role performance project team members when analyzed separately. However when the two constructs (transformational leadership and transactional leadership of project manager) were analyzed simultaneously, transformational leadership was found to have more impact on extra-role performance project team members compared to transactional leadership. These findings explained that although transformational and transactional leadership of project managers can improve extra-role performance project team members, but this study has proved that transformational leadership of project managers affect extra-role performance project team members more as compared to transactional leadership.

  6. Knowledge management in design teams using a project website

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for

  7. Exploring leadership in self-managed project teams in Malaysia

    Directory of Open Access Journals (Sweden)

    Zaleha Yazid

    2015-01-01

    Full Text Available This paper focuses on a longitudinal approach in exploring leadership in Self-Managed Project Teams (SMPT. SMPT has been known to contribute to organizations by improving productivity and increasing organizational performance. Therefore, understanding the dynamics of leadership in this type of team can be seen as one of the important factors to ensure the success of organizations. Leading a team which manages itself is a challenge as increased autonomy and control is given to the team which eliminates the existence of a leader. It is important to understand the extent of how the external leader is involved within SMPT and whether the external leader approaches highlighted in the literature are applicable in such a situation and how these approaches change during work processes. This study comprises of evidence collected through semi-structured interviews in two small and medium sized organizations in Malaysia. Weekly telephone interviews as well as face-to-face interviews were conducted which provides contextual data for the research. In this research, the evidence suggested that SMPT transform from self-managed toward leader-managed resulting from several factors, such as conflict handling strategies. Specifically, it was found that avoiding conflicts, rather than confronting, transform the team into being leader dependent.

  8. A Team Building Model for Software Engineering Courses Term Projects

    Science.gov (United States)

    Sahin, Yasar Guneri

    2011-01-01

    This paper proposes a new model for team building, which enables teachers to build coherent teams rapidly and fairly for the term projects of software engineering courses. Moreover, the model can also be used to build teams for any type of project, if the team member candidates are students, or if they are inexperienced on a certain subject. The…

  9. Distributed team cohesion – not an oxymoron. The impact of information and communications technologies on teamness in globally distributed IT projects

    Directory of Open Access Journals (Sweden)

    Olga Stawnicza

    2015-01-01

    Full Text Available Globally distributed IT projects are common practice in today’s globalized world. Typically, project team members’ work on interdependent tasks, with a common goal to be achieved as one team. However, being split between multiple locations impedes communication among team members and hampers the development of trust. Information and communications media enable communication between geographically distributed project team members and help to create and maintain trust within project units. Communication and trust are particularly significant for fostering a feeling of oneness among project team members. Oneness, also referred to as “teamness”, is repeatedly mentioned as one of the challenges facing global project teams. However, prior literature on teamness is very scarce and its importance is underrepresented. This research contributes to the field in two ways. First, the theoretical study based on a systematic literature review examines available evidence of teamness in globally distributed projects. Secondly, an empirical study based on interviews conducted with global project managers fills the current gap in literature on the link between use of ICT and establishing a sense of team unity. This paper draws practitioners’ attention to the importance of striving for teamness in spite of the geographical distance that exists between project team members.

  10. Experiences with Designing a Team Project Module for Teaching Teamwork to Students

    OpenAIRE

    Bieliková, Mária

    2005-01-01

    Team projects play an important role in the education of engineers. This paper describes a team project module (called Team project) that is part of a postgraduate course in Informatics. Its main objective is to give students a hands-on experience with different aspects of working in team on a problem. We discuss several aspects that should be considered in designing such module as a part of a curriculum: team formation, team communication, team assessment, problem statement and assignment, d...

  11. Students’ Team Project Experiences and Their Attitudes Towards Teamwork

    OpenAIRE

    Aleksandra Rudawska

    2017-01-01

    Purpose: The aim of the study is to evaluate the influence of team project experiences of students (presence and role of a leader; fairness in team projects; conditions supporting teamwork created by a university) on their attitudes towards teamwork, especially the perception of teamwork effectiveness and the preference of working in teams. Methodology: In the study the quantitative research was done among master degree Polish students of Management (105 questionnaires). The measures used f...

  12. Occupational emerging risks affecting international virtual project Team Results

    Directory of Open Access Journals (Sweden)

    Dumitraşcu-Băldău Iulia

    2017-01-01

    Full Text Available The expansion of internet access, high-speed connection services, collaborative work platforms and tools, allowed employees to interact virtually offering companies the possibility to develop projects around the world, reducing operational costs and gain competitive advantage. Realizing the advantages and disadvantages of developing a project team in an international virtual work environment, requires adopting specific strategies to construct an effective team and ensure the project success. One of the most important disadvantages that we identified is that the new work environment brings new risks for both team members and managers. So, it becomes mandatory to identify and analyze the occupational emerging risks and their impact on the productivity of virtual team members, in order to prevent them efficiently and to ensure the safety and health of employees in a virtual working environment. This paper aims to highlight the necessity for project managers and organizations, to include in their specific project strategies, an efficient occupational risks management in the virtual workplace, to obtain a continuously improved virtual working environment, so to achieve a high performance from virtual employees.

  13. Team role stress : relationships with team learning and performance in project teams

    NARCIS (Netherlands)

    Savelsbergh, C.; Gevers, J.M.P.; Heijden, van der B.I.J.M.; Poell, R.F.

    2012-01-01

    Although role stress literature has almost exclusively focused on individual role incumbents, it is conceivable that shared conditions of ambiguity, conflict, and quantitative or qualitative overload may give rise to a collective experience of role stress in teams. Testing a multilevel mediation

  14. Team research at the biology-mathematics interface: project management perspectives.

    Science.gov (United States)

    Milton, John G; Radunskaya, Ami E; Lee, Arthur H; de Pillis, Lisette G; Bartlett, Diana F

    2010-01-01

    The success of interdisciplinary research teams depends largely upon skills related to team performance. We evaluated student and team performance for undergraduate biology and mathematics students who participated in summer research projects conducted in off-campus laboratories. The student teams were composed of a student with a mathematics background and an experimentally oriented biology student. The team mentors typically ranked the students' performance very good to excellent over a range of attributes that included creativity and ability to conduct independent research. However, the research teams experienced problems meeting prespecified deadlines due to poor time and project management skills. Because time and project management skills can be readily taught and moreover typically reflect good research practices, simple modifications should be made to undergraduate curricula so that the promise of initiatives, such as MATH-BIO 2010, can be implemented.

  15. Teaching supply chain management through global projects with global project teams

    NARCIS (Netherlands)

    Kopczak, L.R.; Fransoo, J.C.

    2000-01-01

    In this article, we describe the Global Project Coordination Course, a course in which project teams composed of three students from each of two overseas universities execute company-sponsored projects dealing with global supply chain management issues. The $75,000 to $100,00 contributed in total by

  16. Team dynamics in complex projects

    NARCIS (Netherlands)

    Oeij, P.; Vroome, E.E.M. de; Dhondt, S.; Gaspersz, J.B.R.

    2012-01-01

    Complexity of projects is hotly debated and a factor which affects innovativeness of team performance. Much attention in the past is paid to technical complexity and many issues are related to natural and physical sciences. A growing awareness of the importance of socioorganisational issues is

  17. Team self-regulation and meeting deadlines in project teams: antecedents and effects of temporal consensus

    NARCIS (Netherlands)

    Gevers, J.M.P.; van Eerde, W.; Rutte, C.G.

    2009-01-01

    In a longitudinal study among 48 project teams, we investigated how temporal consensus (i.e., the extent to which team members have a shared understanding of the temporal aspects of their collective task) affects the ability of teams to establish coordinated action and meet deadlines. In addition,

  18. The Automated Assembly Team contributions to the APRIMED Agile Manufacturing Project

    International Nuclear Information System (INIS)

    Jones, R.E.; Ames, A.L.; Calton, T.L.

    1995-06-01

    The Automated Assembly Team of the APRIMED Project (abbreviated as A') consists of two parts: the Archimedes Project, which is an ongoing project developing automated assembly technology, and the A' Robot Team. Archimedes is a second generation assembly planning system that both provides a general high-level assembly sequencing capability and, for a smaller class of products, facilitates automatic programming of a robotic workcell to assemble them. The A' robot team designed, developed, and implemented a flexible robot workcell which served as the automated factory of the A' project. In this document we briefly describe the role of automated assembly planning in agile manufacturing, and specifically describe the contributions of the Archimedes project and the A' robot team to the A' project. We introduce the concepts of the Archimedes automated assembly planning project, and discuss the enhancements to Archimedes which were developed in response to the needs of the A' project. We also present the work of the A' robot team in designing and developing the A' robot workcell, including all tooling and programming to support assembly of the A' discriminator devices. Finally, we discuss the process changes which these technologies have enabled in the A' project

  19. Conducting a team-based multi-sited focused ethnography in primary care

    Directory of Open Access Journals (Sweden)

    A.P. Bikker

    2017-09-01

    Full Text Available Abstract Focused ethnography is an applied and pragmatic form of ethnography that explores a specific social phenomenon as it occurs in everyday life. Based on the literature a problem-focused research question is formulated before the data collection. The data generation process targets key informants and situations so that relevant results on the pre-defined topic can be obtained within a relatively short time-span. As part of a theory based evaluation of alternative forms of consultation (such as video, phone and email in primary care we used the focused ethnographic method in a multisite study in general practice across the UK. To date there is a gap in the literature on using focused ethnography in healthcare research. The aim of the paper is to build on the various methodological approaches in health services research by presenting the challenges and benefits we encountered whilst conducing a focused ethnography in British primary care. Our considerations are clustered under three headings: constructing a shared understanding, dividing the tasks within the team, and the functioning of the focused ethnographers within the broader multi-disciplinary team. As a result of using this approach we experienced several advantages, like the ability to collect focused data in several settings simultaneously within in a short time-span. Also, the sharing of experiences and interpretations between the researchers contributed to a more holistic understanding of the research topic. However, mechanisms need to be in place to facilitate and synthesise the observations, guide the analysis, and to ensure that all researchers feel engaged. Reflection, trust and flexibility among the team members were crucial to successfully adopt a team focused ethnographic approach. When used for policy focussed applied healthcare research a team-based multi-sited focused ethnography can uncover practices and understandings that would not be apparent through surveys or

  20. Conducting a team-based multi-sited focused ethnography in primary care.

    Science.gov (United States)

    Bikker, A P; Atherton, H; Brant, H; Porqueddu, T; Campbell, J L; Gibson, A; McKinstry, B; Salisbury, C; Ziebland, S

    2017-09-12

    Focused ethnography is an applied and pragmatic form of ethnography that explores a specific social phenomenon as it occurs in everyday life. Based on the literature a problem-focused research question is formulated before the data collection. The data generation process targets key informants and situations so that relevant results on the pre-defined topic can be obtained within a relatively short time-span. As part of a theory based evaluation of alternative forms of consultation (such as video, phone and email) in primary care we used the focused ethnographic method in a multisite study in general practice across the UK. To date there is a gap in the literature on using focused ethnography in healthcare research.The aim of the paper is to build on the various methodological approaches in health services research by presenting the challenges and benefits we encountered whilst conducing a focused ethnography in British primary care. Our considerations are clustered under three headings: constructing a shared understanding, dividing the tasks within the team, and the functioning of the focused ethnographers within the broader multi-disciplinary team.As a result of using this approach we experienced several advantages, like the ability to collect focused data in several settings simultaneously within in a short time-span. Also, the sharing of experiences and interpretations between the researchers contributed to a more holistic understanding of the research topic. However, mechanisms need to be in place to facilitate and synthesise the observations, guide the analysis, and to ensure that all researchers feel engaged. Reflection, trust and flexibility among the team members were crucial to successfully adopt a team focused ethnographic approach. When used for policy focussed applied healthcare research a team-based multi-sited focused ethnography can uncover practices and understandings that would not be apparent through surveys or interviews alone. If conducted with

  1. Leadership and organizational tenure diversity as determinants of project team effectiveness

    NARCIS (Netherlands)

    de Poel, Frouke M.; Stoker, Janka I.; Van der Zee, Karen I.

    2014-01-01

    The present study reveals how leadership effectiveness in project teams is dependent on the level of organizational tenure diversity. Data from 34 project teams showed that transformational leadership is related to organizational commitment, creative behavior, and job satisfaction, but only in teams

  2. Leadership and Organizational Tenure Diversity as Determinants of Project Team Effectiveness

    NARCIS (Netherlands)

    de Poel, Frouke M.; Stoker, Janka I.; Van der Zee, Karen I.

    2014-01-01

    The present study reveals how leadership effectiveness in project teams is dependent on the level of organizational tenure diversity. Data from 34 project teams showed that transformational leadership is related to organizational commitment, creative behavior, and job satisfaction, but only in teams

  3. Problem-Based Service Learning: The Evolution of a Team Project

    Science.gov (United States)

    Connor-Greene, Patricia A.

    2002-01-01

    In this article, I describe the evolution of a problem-based service learning project in an undergraduate Abnormal Psychology course. Students worked in teams on a semester-long project to locate and evaluate information and treatment for specific psychiatric disorders. As part of the project, each team selected relevant bibliographic materials,…

  4. Change Management for using a Project Website in Design Team Communication

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Emitt, S.; Prins, M.

    2005-01-01

    A Project Website (PWS) has been advocated as an important tool for design teams of construction projects, because the tool is supposed to greatly enhance team communication. This, finally, should result in improved team performance in terms of increase of efficiency and effectiveness. PWS vendors

  5. Developing Your Dream Team

    Science.gov (United States)

    Gatlin, Kenda

    2005-01-01

    Almost anyone has held various roles on a team, be it a family unit, sports team, or a project-oriented team. As an educator, one must make a conscious decision to build and invest in a team. Gathering the best team possible will help one achieve one's goals. This article explores some of the key reasons why it is important to focus on the team…

  6. Complex approach in telecommunication engineering education: develop engineering skills by a team project

    Directory of Open Access Journals (Sweden)

    Scripcariu Luminița

    2017-01-01

    Full Text Available This paper provides an overview of the educational process of telecommunication engineering students by presenting the preparation of a team project focused on information security. Our educational approach combines basic knowledge such as mathematics with specialized engineering notions and various skills. The project theme is to design, implement and test an encryption algorithm. Students are provided with online courses, specific software programs and Internet access. They have to choose an encryption algorithm, to study its details and to write the script of the encryption algorithm in MATLAB program. The algorithm is implemented in C/C++ programming language and tested. Finally, a concurrent team tries to break the algorithm by finding the decryption key. It is an interactive approach which combines various education methods including gaming concepts. The covered topics provide students professional outcomes such as knowledge and use of specific mathematical tools and software environments (C/C ++ programming languages, MATLAB, abilities to design, develop, implement and test software algorithms. The project also provides transversal outcomes such as ability to team work, skills of computer use and information technology and capability to take responsibilities. Creativity is also encouraged by extending the algorithm to other encryption key lengths than the usual ones.

  7. Team Research at the Biology-Mathematics Interface: Project Management Perspectives

    Science.gov (United States)

    Milton, John G.; Radunskaya, Ami E.; Lee, Arthur H.; de Pillis, Lisette G.; Bartlett, Diana F.

    2010-01-01

    The success of interdisciplinary research teams depends largely upon skills related to team performance. We evaluated student and team performance for undergraduate biology and mathematics students who participated in summer research projects conducted in off-campus laboratories. The student teams were composed of a student with a mathematics…

  8. Consequences of team charter quality: Teamwork mental model similarity and team viability in engineering design student teams

    Science.gov (United States)

    Conway Hughston, Veronica

    Since 1996 ABET has mandated that undergraduate engineering degree granting institutions focus on learning outcomes such as professional skills (i.e. solving unstructured problems and working in teams). As a result, engineering curricula were restructured to include team based learning---including team charters. Team charters were diffused into engineering education as one of many instructional activities to meet the ABET accreditation mandates. However, the implementation and execution of team charters into engineering team based classes has been inconsistent and accepted without empirical evidence of the consequences. The purpose of the current study was to investigate team effectiveness, operationalized as team viability, as an outcome of team charter implementation in an undergraduate engineering team based design course. Two research questions were the focus of the study: a) What is the relationship between team charter quality and viability in engineering student teams, and b) What is the relationship among team charter quality, teamwork mental model similarity, and viability in engineering student teams? Thirty-eight intact teams, 23 treatment and 15 comparison, participated in the investigation. Treatment teams attended a team charter lecture, and completed a team charter homework assignment. Each team charter was assessed and assigned a quality score. Comparison teams did not join the lecture, and were not asked to create a team charter. All teams completed each data collection phase: a) similarity rating pretest; b) similarity posttest; and c) team viability survey. Findings indicate that team viability was higher in teams that attended the lecture and completed the charter assignment. Teams with higher quality team charter scores reported higher levels of team viability than teams with lower quality charter scores. Lastly, no evidence was found to support teamwork mental model similarity as a partial mediator of the team charter quality on team viability

  9. Student-Led Project Teams: Significance of Regulation Strategies in High- and Low-Performing Teams

    Science.gov (United States)

    Ainsworth, Judith

    2016-01-01

    We studied group and individual co-regulatory and self-regulatory strategies of self-managed student project teams using data from intragroup peer evaluations and a postproject survey. We found that high team performers shared their research and knowledge with others, collaborated to advise and give constructive criticism, and demonstrated moral…

  10. Cooperative Learning through Team-Based Projects in the Biotechnology Industry.

    Science.gov (United States)

    Luginbuhl, Sarah C; Hamilton, Paul T

    2013-01-01

    We have developed a cooperative-learning, case studies project model that has teams of students working with biotechnology professionals on company-specific problems. These semester-long, team-based projects can be used effectively to provide students with valuable skills in an industry environment and experience addressing real issues faced by biotechnology companies. Using peer-evaluations, we have seen improvement in students' professional skills such as time-management, quality of work, and level of contribution over multiple semesters. This model of team-based, industry-sponsored projects could be implemented in other college and university courses/programs to promote professional skills and expose students to an industry setting.

  11. Development of an Integrated Team Training Design and Assessment Architecture to Support Adaptability in Healthcare Teams

    Science.gov (United States)

    2017-10-01

    provision of training is not a major focus of this project, trainees were able to practice trauma management skills as well as leadership skills...SUBJECT TERMS Military healthcare team; Trauma teams; Team training; Teamwork; Adaptive performance; Leadership ; Simulation; Modeling; Bayesian belief...ABBREVIATIONS Healthcare team Trauma Trauma teams Team training Teamwork Adaptability Adaptive performance Leadership Simulation Modeling

  12. A Path to Successful Energy Retrofits: Early Collaboration through Integrated Project Delivery Teams

    Energy Technology Data Exchange (ETDEWEB)

    Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-10-01

    This document guides you through a process for the early design phases of retrofit projects to help you mitigate frustrations commonly experienced by building owners and designers. It outlines the value of forming an integrated project delivery team and developing a communication and information-sharing infrastructure that fosters collaboration. This guide does not present a complete process for designing an energy retrofit for a building. Instead, it focuses on the early design phase tasks related to developing and selecting energy efficiency measures (EEMs) that benefit from collaboration, and highlights the resulting advantages.

  13. Managing Geographically Dispersed Teams: From Temporary to Permanent Global Virtual Teams

    DEFF Research Database (Denmark)

    Svane Hansen, Tine; Hope, Alexander John; Moehler, Robert C.

    2012-01-01

    for organisations to move towards establishing permanent Global Virtual Teams in order to leverage knowledge sharing and cooperation across distance. To close this gap, this paper will set the scene for a research project investigating the changed preconditions for organisations. As daily face-to-face communication......The rise and spread of information communication technologies (ICT) has enabled increasing use of geographically dispersed work teams (Global Virtual Teams). Originally, Global Virtual Teams were mainly organised into temporary projects. Little research has focused on the emergent challenge...... generation of self-lead digital natives, who are already practising virtual relationships and a new approach to work, and currently joining the global workforce; and improved communication technologies. Keywords: Global Virtual teams, ICT, leadership, motivation, self-management, millenials....

  14. Management Guidelines for Database Developers' Teams in Software Development Projects

    Science.gov (United States)

    Rusu, Lazar; Lin, Yifeng; Hodosi, Georg

    Worldwide job market for database developers (DBDs) is continually increasing in last several years. In some companies, DBDs are organized as a special team (DBDs team) to support other projects and roles. As a new role, the DBDs team is facing a major problem that there are not any management guidelines for them. The team manager does not know which kinds of tasks should be assigned to this team and what practices should be used during DBDs work. Therefore in this paper we have developed a set of management guidelines, which includes 8 fundamental tasks and 17 practices from software development process, by using two methodologies Capability Maturity Model (CMM) and agile software development in particular Scrum in order to improve the DBDs team work. Moreover the management guidelines developed here has been complemented with practices from authors' experience in this area and has been evaluated in the case of a software company. The management guidelines for DBD teams presented in this paper could be very usefully for other companies too that are using a DBDs team and could contribute towards an increase of the efficiency of these teams in their work on software development projects.

  15. Progress report on recommendations of the Flaring Project Team

    International Nuclear Information System (INIS)

    Macken, C.

    1999-01-01

    Part of the mandate of the Clean Air Strategic Alliance (CASA) is to share decision-making responsibility for air quality management with the government of Alberta, through the ministries of Environmental Protection, Energy, and Health, and the Alberta Energy and Utilities Board (EUB). CASA's vision for air quality in Alberta is that 'the air will be odourless, tasteless, look clear, and have no measurable short- or long-term adverse effects on people, animals, or the environment'. In 1997, CASA approved the establishment of the Flaring Project Team in response to public concern about potential and observed impacts associated with flaring of solution gas. Members of that team established a framework for the management of solution gas flaring. Their long-term goal is to eliminate routine flaring of solution gas. The Project Team assessed existing information on solution gas flaring, including technologies, efficiencies, emissions and impacts. Alternative technologies were also reviewed along with biological and health effects of solution gas flaring. A list of data gaps and research needs was compiled in order to help with the development of the Team's recommendations. The Team's final report was delivered in June 1998. It was recommended that the following policy objective hierarchy be used to guide decisions related to routine solution gas flaring: (1) eliminate routine solution gas flaring, (2) reduce volumes of gas flared, and (3) improve the efficiency of flares. By way of progress the Project Team was able to report that in March, 1999, the EUB issued a draft interim directive to address upstream petroleum industry flaring. The draft Directive incorporates the recommendations from the CASA Flaring Project Team with respect to management of solution gas flaring. In December 1998, changes to the royalty structure to encourage the productive use of flare gas have been announced by the Alberta Department of Energy and Alberta Environmental protection, thus

  16. Analysis of Return on Investment in Different Types of Agile Software Development Project Teams

    Directory of Open Access Journals (Sweden)

    Goran MILANOV

    2012-01-01

    Full Text Available This exploratory study of IT project teams in Serbia investigates how the choice of agile methods in different development project teams affects the return-on-investment (ROI. In this paper different types of software project teams are analyzed in order to examine and identify the business-value of using agile methods. In various software development project teams, the ROI of agile methods is yet to be fully explored, while the ROI of traditional methods is well-understood. Since ROI is important indicator of the projects success, in this paper we examine the factors that influence the ROI both from software solution customer point of view, and different agile project teams.

  17. Managing teams performing complex innovation projects

    NARCIS (Netherlands)

    Oeij, P.R.A.; Vroome, E.M.M. de; Dhondt, S.; Gaspersz, J.B.R.

    2012-01-01

    Complexity of projects is hotly debated and a factor which affects innovativeness of team performance. Much attention in the past is paid to technical complexity and many issues are related to natural and physical sciences. A growing awareness of the importance of socio-organisational issues is

  18. Methodology Proposal for Increasing Swift Trust within Virtual Teams in the Inception Phase of a Project Life-Cycle: Project Manager’s Perspective

    Directory of Open Access Journals (Sweden)

    Milovanović Bojan Morić

    2015-12-01

    Full Text Available This paper proposes team building methodology for project managers in virtual teams as means to develop swift trust between new team members in the inception phase of the project life cycle. Proposed methodology encompasses activities within the first three days after the team formation and proposes the measuring tools for monitoring and managing trust development within the project team. Aim of this paper is to provide new insights to various decision makers potentially interested in increasing the performance of project teams operating in virtual environment, such as: investors, business owners and project managers working in virtual environment.

  19. Using an Undergraduate Materials Research Project to Foster Multidisciplinary Teaming Skills

    Science.gov (United States)

    Newell, James A.; Cleary, Doug D.

    2004-01-01

    This paper describes the use of undergraduate materials multidisciplinary research projects as a means of addressing the growing industrial demand for graduates experienced in working in multidisciplinary teams. It includes a detailed description of a project in which a multidisciplinary team of chemical engineering and civil engineering students…

  20. DIPLOMA PROJECT TEAM WORK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    V. S. Kruglyk

    2014-04-01

    Full Text Available During the work performance students should get the maximal approach to the process of real project execution, so the project should include the need to use the latest technology, integration of data or services with different developments, architecture design, interaction of the team members and others. Implementation of graduation projects is the useful activity for the acquisition and consolidation of key IT competencies. Since the task of educational projects is maximal close to real one, students participate almost in all typical stages of commercial product’s development, and do so successfully. This is also confirmed practically: students, who were actively engaged in some projects at the university, have key positions in IT companies of the city and country after that. The main objective of the paper is to describe the organization of a common group students’ work on a degree project, implementation peculiarity of such projects, recommendations for improving the quality of projects. Thus, the paper is devoted to the peculiarities of the joint students’ work on a project during diploma execution in IT specialties, as the final part of the acquisition and consolidation process of key IT competencies of future programmers. The problem of choosing work topic, project concept, work organization in a group, implementation process organization has been considered. Also the specific stages of software development have been considered: development of interface, choice of technology, product quality, project disposal to the next developers, project completion.

  1. Team and Project Work in Engineering Practices

    Directory of Open Access Journals (Sweden)

    Anders Buch

    2015-11-01

    Full Text Available In this article, we investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals. The article investigates how professional engineering practices are enacted in two engineering consultancy companies in Denmark where teamwork has been or is an ideal for organizing work. Through a practice-based lens, the article sets out to investigate, firstly, how discourses about team and project work affect engineering work practices; secondly, how technologymediated management is reconciled in teamwork practices; and thirdly, how team and project work affect engineering professionalism and collaborative work practices. A practice theoretical framework informs the analysis. Teamwork is investigated as a phenomenon enacted through the sayings, doings and relatings of practitioners in landscapes of practices and the interconnectedness of the practices is traced through the setup of specific ecologies in the sites.

  2. A Project Team Analysis Using Tuckman's Model of Small-Group Development.

    Science.gov (United States)

    Natvig, Deborah; Stark, Nancy L

    2016-12-01

    Concerns about equitable workloads for nursing faculty have been well documented, yet a standardized system for workload management does not exist. A project team was challenged to establish an academic workload management system when two dissimilar universities were consolidated. Tuckman's model of small-group development was used as the framework for the analysis of processes and effectiveness of a workload project team. Agendas, notes, and meeting minutes were used as the primary sources of information. Analysis revealed the challenges the team encountered. Utilization of a team charter was an effective tool in guiding the team to become a highly productive group. Lessons learned from the analysis are discussed. Guiding a diverse group into a highly productive team is complex. The use of Tuckman's model of small-group development provided a systematic mechanism to review and understand group processes and tasks. [J Nurs Educ. 2016;55(12):675-681.]. Copyright 2016, SLACK Incorporated.

  3. Can teams benefit from using a mindful infrastructure when defensive behaviour threatens complex innovation projects?

    NARCIS (Netherlands)

    Oeij, P.R.A.; Dhondt, S.; Gaspersz, J.B.R.; Vroome, E.M.M. de

    2016-01-01

    Projects are often doomed to fail. An explorative case study which carried out team-based complex innovation projects in a research and technology organisation suggests three main results. 1] Project team leaders experienced that the complexity involved in the various aspects of team functioning,

  4. The Cultural Challenges of Managing Global Project Teams: A Study of Brazilian Multinationals

    Directory of Open Access Journals (Sweden)

    Ivete Rodrigues

    2013-04-01

    Full Text Available The internationalization of Brazilian companies brings a new reality: the need for implementation of global projects that bring, in turn, the challenge of managing multicultural teams. Since this is a recent phenomenon with little theoretical development, this study sought to understand the relationships between cultural characteristics and management teams of global projects in Brazilian multinationals. To carry this discussion forward, we studied six cases of Brazilian multinational companies, with the aim of deepening the understanding of the management of global teams, involving the planning, deployment, development and management of human resources. Among the projects studied, it was found that there is very little concern with the specific issue of multiculturalism and little inter-cultural incentive to the development of team members, which ends up hindering the construction of a global mindset, important for the Brazilian multinational companies to perform successfully abroad. Faced with this situation, each of the managerial processes mentioned were presented with a number of actions to be undertaken by the project manager in three different dimensions: the project itself, the organization and the global environment. The work contributes, thus, to enable Brazilian multinational companies to manage their global teams in order to maximize the advantages of global teams, such as increased creativity and innovative capacity, but avoid the problems that multiculturalism can bring, ranging from conflicts between people to project failure.

  5. Managing Project Team in Local Government B.A. Amujiri Abstract ...

    African Journals Online (AJOL)

    Religion Dept

    government and discovered that managing project team is indispensable in local governments .... subordinate; improve employee motivation; improve communication between .... or events required in completing the project. This will help to.

  6. An Interdisciplinary Team Project: Psychology and Computer Science Students Create Online Cognitive Tasks

    Science.gov (United States)

    Flannery, Kathleen A.; Malita, Mihaela

    2014-01-01

    We present our case study of an interdisciplinary team project for students taking either a psychology or computer science (CS) course. The project required psychology and CS students to combine their knowledge and skills to create an online cognitive task. Each interdisciplinary project team included two psychology students who conducted library…

  7. NIMROD: A Customer Focused, Team Driven Approach for Fusion Code Development

    Science.gov (United States)

    Karandikar, H. M.; Schnack, D. D.

    1996-11-01

    NIMROD is a new code that will be used for the analysis of existing fusion experiments, prediction of operational limits, and design of future devices. An approach called Integrated Product Development (IPD) is being used for the development of NIMROD. It is a dramatic departure from existing practice in the fusion program. Code development is being done by a self-directed, multi-disciplinary, multi-institutional team that consists of experts in plasma theory, experiment, computational physics, and computer science. Customer representatives (ITER, US experiments) are an integral part of the team. The team is using techniques such as Quality Function Deployment (QFD), Pugh Concept Selection, Rapid Prototyping, and Risk Management, during the design phase of NIMROD. Extensive use is made of communication and internet technology to support collaborative work. Our experience with using these team techniques for such a complex software development project will be reported.

  8. Toward a model of socializing project team members : An integrative approach

    NARCIS (Netherlands)

    Batistič, S.; Kenda, R.

    2018-01-01

    Project work is becoming more and more important in everyday business, as is staffing the right newcomers for the project. Recognizing that not all new project team workers possess equally important specific knowledge, skills and abilities for the success of projects, we draw on project management,

  9. Total Quality Management: Analysis, Evaluation and Implementation Within ACRV Project Teams

    Science.gov (United States)

    Raiman, Laura B.

    1991-01-01

    Total quality management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The Assured Crew Return Vehicle (ACRV) Project Office was identified as an excellent project in which to demonstrate the applications and benefits of TQM processes. As the ACRV Program moves through its various stages of development, it is vital that effectiveness and efficiency be maintained in order to provide the Space Station Freedom (SSF) crew an affordable, on-time assured return to Earth. A critical factor for the success of the ACRV is attaining the maximum benefit from the resources applied to the program. Through a series of four tutorials on various quality improvement techniques, and numerous one-on-one sessions during the SSF's 10-week term in the project office, results were obtained which are aiding the ACRV Office in implementing a disciplined, ongoing process for generating fundamental decisions and actions that shape and guide the organization. Significant advances were made in improving the processes for two particular groups - the correspondence distribution team and the WATER Test team. Numerous people from across JSC were a part of the various team activities including engineering, man systems, and safety. The work also included significant interaction with the support contractor to the ACRV Project. The results of the improvement activities can be used as models for other organizations desiring to operate under a system of continuous improvement. In particular, they have advanced the ACRV Project Teams further down the path of continuous improvement, in support of a working philosophy of TQM.

  10. Multidisciplinary safety team (MDST) factors of success.

    Science.gov (United States)

    2014-11-01

    This project included a literature review and summary that focused on subjects related to team building, team/committee member : motivational strategies, and tools for effective and efficient committee meetings. It also completed an online survey of ...

  11. A model for selecting project team members using multicriteria group decision making

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-04-01

    Full Text Available Selecting a project team is a complex multi-criteria decision-making problem. For this reason, one appropriate way to tackle such problems involves the use of multi-criteria decision aid methods. However, most of the decisions taken regarding the selection of project teams are made by a group of people. It is this which changes the focus of the problem by moving from one decision-maker (DM to a group of DMs. Analysis needs to be extended in order to consider the preference structure of each individual group member. In this paper, we present a group decision model for project team selection based on a multi-criteria evaluation of the preferences of a client's representatives. It could be applied to any decision problem since it involves a group of decision makers whose preferences diverge little. An application of the model in order to select consultants for a construction project is presented.A seleção da equipe em um projeto é um problema de decisão multicritério. Uma forma apropriada de tratar tais problemas envolve o uso de métodos de apoio multicritério a decisão. Grande parte desses problemas envolve um grupo de decisores. Dessa forma, há uma mudança no foco da decisão de um decisor para um grupo de decisores. A análise deve ser ampliada no intuito de considerar a estrutura de preferência de cada membro do grupo. Nesse artigo, apresentamos um modelo aplicado à seleção de equipe de um projeto baseado na avaliação multicritério das preferências dos representantes do cliente do projeto. Pode ser aplicado a qualquer problema de decisão desde que envolva um grupo de decisores que tenham pequena divergência em relação às suas preferências. Uma aplicação para seleção de parte da equipe de um projeto de construção é apresentada.

  12. Virtual Team and Trust Relationship: Focus Group Interviews in Multimedia Super Corridor Status Companies

    Directory of Open Access Journals (Sweden)

    Norizah Aripin

    2011-12-01

    Full Text Available This paper aims to discuss the trust relationship in virtual teams in Multimedia Super Corridor (MSC status companies. The study used qualitative method that is phenomenology approach through focus group interviews. In-depth interview were also used with semi-structured and openended questions. The interviews involved six staffs at different position in virtual team (two team leaders, and four team members. The interviews were recorded, transcribed and analyzed according to the thematic analysis. Results showed that dimensions on virtual team trust relationship including interpersonal communication, personality, team members size, face-to-face meeting needs, safety information when discussing face-to-face in public places, and difficulty to recall interaction via video conferencing with other team members.

  13. Translational Science Project Team Managers: Qualitative Insights and Implications from Current and Previous Postdoctoral Experiences.

    Science.gov (United States)

    Wooten, Kevin C; Dann, Sara M; Finnerty, Celeste C; Kotarba, Joseph A

    2014-07-01

    The development of leadership and project management skills is increasingly important to the evolution of translational science and team-based endeavors. Team science is dependent upon individuals at various stages in their careers, inclusive of postdocs. Data from case histories, as well as from interviews with current and former postdocs, and those supervising postdocs, indicate six essential tasks required of project managers in multidisciplinary translational teams, along with eight skill-related themes critical to their success. To optimize the opportunities available and to ensure sequential development of team project management skills, a life cycle model for the development of translational team skills is proposed, ranging from graduate trainees, postdocs, assistant professors, and finally to mature scientists. Specific goals, challenges and project management roles and tasks are recommended for each stage for the life cycle.

  14. The Trust Project - Symbiotic Human Machine Teams: Social Cueing for Trust and Reliance

    Science.gov (United States)

    2016-06-30

    AFRL-RH-WP-TR-2016-0096 THE TRUST PROJECT - SYMBIOTIC HUMAN-MACHINE TEAMS: SOCIAL CUEING FOR TRUST & RELIANCE Susan Rivers, Monika Lohani, Marissa...30 JUN 2012 – 30 JUN 2016 4. TITLE AND SUBTITLE THE TRUST PROJECT - SYMBIOTIC HUMAN-MACHINE TEAMS: SOCIAL CUEING FOR TRUST & RELIANCE 5a. CONTRACT

  15. Project team motyvation

    OpenAIRE

    Jasionis, Dominykas

    2016-01-01

    The term paper is to analyze the formation of the team and its - motyvation, and interviews from four different companies and find out the leaders in terms of your team, and what principle he tries to motivate her. The Tasks of this paper is to review the organization formed by a team; investigate the promotion of employees in enterprises; The four firms interviewed; Assess how you can work in different organizations. Methods used To analyze the topic, I decided to interview four different co...

  16. Impacts of dairy diagnostic teams on herd performance.

    Science.gov (United States)

    Weinand, D; Conlin, B J

    2003-05-01

    This study evaluated impacts of educational diagnostic teams of consultants used to transfer technology to dairy farms. Herd management performance changes were measured by comparing Dairy Herd Improvement data from 38 project farms to data from herds that were geographical contemporaries. The value of focused goals for effecting change was also assessed. Interviews provided producers' perception of project outcomes and insight on organization and conduct of dairy diagnostic teams. Changes observed in project herds were small compared with controls with tendencies for increased herd size and improved milk production per cow. Focused goals had greater impacts on increasing herd size, milk per cow, first lactation peak milk, reducing age at first calving, and percentages of cows with subclinical mastitis. Time, money, facility limitations, labor, and alternative priorities were the most cited constraints to implementing changes. Satisfaction scores of producers were significantly related to the degree that team recommendations were followed. Improved attitudes, quality of life, and financial well-being were benefits listed by a majority of producers from participation in the project. If similar projects were to be offered, 83% said they would participate again, and 69% indicated they would pay at least some of the costs. Project farms served as demonstration farms for 1930 other producers in their respective locales, resulting in a multiplier effect of original advice given by consultant teams. Suggestions by farmer participants for improvements in dairy diagnostic teams included needs for at least some unbiased team members, more frequent meetings, more follow-up on recommendations, and consistency of recommendations with family goals.

  17. [Dream Team--a pre-graduate surgical talent development project].

    Science.gov (United States)

    Jensen, Rune Dall; Christensen, Mette Krogh; Seyer-Hansen, Mikkel

    2014-08-04

    In 2009 surgeons from Aarhus University Hospital founded an extracurricular talent development project based on a skill-acquisition training programme for medical students at Aarhus University. The training program, named Dream Team, provides medical students with the opportunity to pursue a career in surgery. This paper presents and discusses the organizational and pedagogical framework of the concept Dream Team, as well as the results from two inquiries: a survey and an exploratory observational study. The inquiries were conducted in summer 2013.

  18. A GUIDE TO RECOMMENDATIONS FOR WORKING WITH VIRTUAL TEAMS ON PROJECTS GUIDED BY PMI

    Directory of Open Access Journals (Sweden)

    Maíra Paschoalino Fernandes Bahia

    2017-12-01

    Full Text Available Due the demand of markets to be more competitive in search of immediate results, reach high quality and low cost, the companies are seeking alternatives to have more quality, minimize the cost and speed up the time in a project. One example is work with a model of teams called virtual teams. In order to identify bottlenecks and difficulties encountered in this team model to minimize the risk of failures in a project, this study applied a survey to professionals of various nationalities with experience working with virtual teams based in projects guided by PMI good practices. At the end of this study was possible to quantify and relate the main problems listed by these professionals, which prevented them from completing the projects on time, cost and quality desired. Thus for each of the points mentioned it was suggested some recommendations for the application of tools and techniques most suitable in this context.

  19. A Quantitative Study of Global Software Development Teams, Requirements, and Software Projects

    Science.gov (United States)

    Parker, Linda L.

    2016-01-01

    The study explored the relationship between global software development teams, effective software requirements, and stakeholders' perception of successful software development projects within the field of information technology management. It examined the critical relationship between Global Software Development (GSD) teams creating effective…

  20. Investigating the Linkage between Intrinsic Motivation and Project Team Satisfaction in Undergraduate Agricultural Leadership Students

    Science.gov (United States)

    Lamm, Kevan W.; Carter, Hannah S.; Melendez, Marcus W.

    2014-01-01

    Organizations have increased the amount of work that is completed by project teams over the past several decades. This trend is projected to continue into the foreseeable future. In response to this trend, the academic community has increased the number of project team based learning experiences for students in classes. The challenge has been that…

  1. The programme benefits of improving project team communication through a contact centre

    Directory of Open Access Journals (Sweden)

    Bond-Barnard, T. J.

    2013-08-01

    Full Text Available A South African national programme to repair government infrastructure uses a contact centre (or call centre to facilitate and manage communication. An important question is: How does the contact centre benefit the programme and its projects? This study discusses the findings of a survey that quantified the benefits of the programme when the communication between team members in the programme was improved by using a contact centre. The results show that, by using a contact centre to improve the communication between project team members, their perception of communication effectiveness, quality of project deliverables, service delivery, and customer satisfaction of the programme dramatically increases.

  2. Formal and informal computer mediated communication within within design teams for complex building projects

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Gray, C.; Prins, M.

    2001-01-01

    In this paper the information environment of design teams is discussed because of the use of Internet based Project websites (PWS) to improve the information exchange within design teams. Because design teams heavenly depend on informal information exchange and PWS is a tool for formalising

  3. One more thing: Faculty response to increased emphasis on project teams in undergraduate engineering education

    Science.gov (United States)

    Hunter, Jane

    Tenured and tenure-track faculty members at institutions of higher education, especially those at Research I institutions, are being asked to do more than ever before. With rapidly changing technology, significant decreases in public funding, the shift toward privately funded research, and the ever increasing expectations of students for an education that adequately prepares them for professional careers, engineering faculty are particularly challenged by the escalating demands on their time. In 1996, the primary accreditation organization for engineering programs (ABET) adopted new criteria that required, among other things, engineering programs to teach students to function on multidisciplinary teams and to communicate effectively. In response, most engineering programs utilize project teams as a strategy for teaching these skills. The purpose of this qualitative study of tenured and tenure track engineering faculty at a Research I institution in the southwestern United States was to explore the variety of ways in which the engineering faculty responded to the demands placed upon them as a result of the increased emphasis on project teams in undergraduate engineering education. Social role theory and organizational climate theory guided the study. Some faculty viewed project teams as an opportunity for students to learn important professional skills and to benefit from collaborative learning but many questioned the importance and feasibility of teaching teamwork skills and had concerns about taking time away from other essential fundamental material such as mathematics, basic sciences and engineering sciences. Although the administration of the College of Engineering articulated strong support for the use of project teams in undergraduate education, the prevailing climate did little to promote significant efforts related to effective utilization of project teams. Too often, faculty were unwilling to commit sufficient time or effort to make project teamwork a

  4. Team- and project work in engineering practices

    DEFF Research Database (Denmark)

    Buch, Anders; Andersen, Vibeke

    2015-01-01

    in teamwork practices, and, thirdly, how team- and project work affect engineering professionalism and collaborative work practices. A practice theoretical framework informs the analysis. Teamwork is investigated as a phenomenon enacted through the sayings, doings and relatings of practitioners in landscapes......In this paper we investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals. The paper investigates how professional engineering practices are enacted in two engineering...... consultancy companies in Denmark where teamwork has been or is an ideal for organizing work. Through a practice-based lens the article sets out to investigate, firstly, how discourses about teamand project work affect engineering work practices, secondly, how technology-mediated management is reconciled...

  5. Results Without Authority Controlling a Project When the Team Doesn't Report to You

    CERN Document Server

    KENDRICK, Tom

    2012-01-01

    It's tricky enough to spearhead a big project when you're the boss. But when you're the leader of a team of people who don't report to you, the obstacles are even greater. Results Without Authority is the definitive book for project managers looking to establish credibility and control. A groundbreaker in the field, it supplies a start-to-finish system for getting successful project results from cross-functional, outsourced, and other types of teams. The completely updated second edition includes new information on: * Agile methods and evolving project management tools * Strategies for working

  6. Power relations in the family health team: focus on nursing.

    Science.gov (United States)

    Silva, Iramildes Souza; Arantes, Cássia Irene Spinelli

    2017-01-01

    to analyze the power relations that permeate the work of the family health team, and to discuss perspectives of emancipation of these subjects, focusing on nursing and community health agents. a qualitative study with a family health team from a municipality in the countryside of the state of São Paulo. Data were collected through systematic observation and interview with workers. A thematic content analysis was performed. three categories were identified: the work of the family health team and power relations; power relations between the nurse and the healthcare team; and the relations among the nursing team and between community agents and the nurse. The team produces relations of power moved by hierarchical knowledge that move in the search for the reordering of powers. it is necessary to review the contradictions present in the performance scenario of the family health teams, with a view toward making power relations more flexible. analisar as relações de poder que permeiam o trabalho da equipe de saúde da família e discutir perspectivas de emancipação desses sujeitos, com enfoque na enfermagem e agentes comunitários de saúde. estudo qualitativo com equipe de saúde da família de município do interior paulista. Os dados foram coletados por meio de observação sistemática e entrevista com os trabalhadores. Foi realizada análise de conteúdo temática. foram identificadas três categorias: o trabalho da equipe de saúde da família e as relações de poder; a relação de poder entre enfermeira e equipe de saúde; as relações da enfermagem e agentes comunitários com a enfermeira. A equipe produz relações de poder movidas por saberes hierarquizados que se movimentam na busca pelo reordenamento dos poderes. é necessário rever as contradições presentes no cenário de atuação das equipes de saúde da família, com vistas à flexibilidade nas relações de poder.

  7. Interdisciplinary collaboration within project-level NEPA teams in the US Forest Service

    Science.gov (United States)

    James W. Freeman; Marc J. Stern; Michael Mortimer; Dale J. Blahna; Lee K. Cerveny

    2011-01-01

    Interdisciplinary teamwork has become a foundation of natural resources planning and management in the US. Yet, we know little about the degree of interdisciplinary collaboration of natural resource planning teams. We conducted 10 case studies of Forest Service NEPA (National Environmental Policy Act) teams working on projects related to the 2005 Travel Management Rule...

  8. Improving Scientific Research Methodology in Undergraduate Medical Students: a case of team based training blended in a research project

    Institute of Scientific and Technical Information of China (English)

    W.Zhang; C.Cambier; Y.Zhang; J.M.Vandeweerd; P.Gustin

    2014-01-01

    An educational intervention targeting medical students and aiming to develop skills useful to the writing of a health science research protocol over a short period of time has been developed in the Shanghai Jiao Tong University School of Medicine. The methodology blending the principles of PBL and TBL is detailed and key issues of this implementation are discussed. Twenty-one students were enrolled in a research master degree and participated to three mandatory 180-minutes sessions. Beyond classical skills useful to solve a problem, this new intervention focused on the transformation of knowledge to create an authentic content, which is a feature of the project-based learning(PBL). The training process was designed according to team-based learning(TBL) procedure except that work sharing between groups and pooling resources and outcomes of each group allowed the construction of one final class original research project in the field of respiratory pharmacology. The combination of both learning methods allowed promoting individual and group accountability necessary to improve self-learning and the quality of the final joint project. The peer reviewing was an essential factor in creating the students’ motivation and improving of team discussion. The grades individually assigned for skills and quality of the project by an external teacher suggested that key objectives of the intervention were reached. In conclusion, the educational intervention described in this paper appears as an appropriate method to develop specific skills necessary to write and discuss a research project within a research team.Further works are necessary to measure the degree of satisfaction of students and improvement of performance.

  9. Plasma focus project

    International Nuclear Information System (INIS)

    Sahlin, H.L.

    1975-12-01

    The primary objective of this project is to provide a relatively simple pulsed power source for high density pulsed fusion studies with a variety of DT and other fusion microexplosion targets. The plasma focus operated on DT at 1 MJ should produce greater than or equal to 10 15 DT neutrons per pulse corresponding to 2800 J of nuclear energy release and for low pressure operation and appropriately configured high Z anode center should yield an x-ray burst of about 1000 J with a substantial fraction of this x-ray energy concentrated in the 5-100 kV range. Because of its x-ray and neutron production potential, the operation of the focus as an x-ray source is also under study and an initial design study for a repetitively pulsed 1 MJ plasma focus as a pulsed neutron materials testing source has been completed. The plasma focus seems particularly appropriate for application as a materials testing source for pulsed fusion reactors, for example, based on laser driven fusion microexplosions. The construction status of the device is described

  10. SemanticOrganizer: A Customizable Semantic Repository for Distributed NASA Project Teams

    Science.gov (United States)

    Keller, Richard M.; Berrios, Daniel C.; Carvalho, Robert E.; Hall, David R.; Rich, Stephen J.; Sturken, Ian B.; Swanson, Keith J.; Wolfe, Shawn R.

    2004-01-01

    SemanticOrganizer is a collaborative knowledge management system designed to support distributed NASA projects, including diverse teams of scientists, engineers, and accident investigators. The system provides a customizable, semantically structured information repository that stores work products relevant to multiple projects of differing types. SemanticOrganizer is one of the earliest and largest semantic web applications deployed at NASA to date, and has been used in diverse contexts ranging from the investigation of Space Shuttle Columbia's accident to the search for life on other planets. Although the underlying repository employs a single unified ontology, access control and ontology customization mechanisms make the repository contents appear different for each project team. This paper describes SemanticOrganizer, its customization facilities, and a sampling of its applications. The paper also summarizes some key lessons learned from building and fielding a successful semantic web application across a wide-ranging set of domains with diverse users.

  11. Exploring the dynamics of formal and informal networks in complex multi-team development projects

    DEFF Research Database (Denmark)

    Kratzer, J.; Gemuenden, H. G.; Lettl, Christopher

    2007-01-01

    The increasing number of complex multi-team projects and the scarcity of knowledge about how to run them successfully, create a need for systematic empirical studies. We attempt to lessen this empirical gap by examining the overlap and structure of formally ascribed design interfaces and informal...... communication networks between participating teams in two complex multi-team projects in the space industry. We study the two projects longitudinally throughout the design and integration phases of product development. There are three major findings. First, formally ascribed design interfaces and informal...... communication networks overlap only marginally. Second, the structure of informal communication remains largely stable in the transition from the design to the integration phase. The third and most intriguing finding is that the weak overlap between formally ascribed design interfaces and the informal...

  12. The Virtual Design Team: Designing Project Organizations as Engineers Design Bridges

    Directory of Open Access Journals (Sweden)

    Raymond E. Levitt

    2012-08-01

    Full Text Available This paper reports on a 20-year program of research intended to advance the theory and practice of organization design for projects from its current status as an art practiced by a handful of consultants worldwide, based on their intuition and tacit knowledge, to: (1 an “organizational engineering” craft, practiced by a new generation of organizational designers; and (2 an attractive and complementary platform for new modes of “virtual synthetic organization theory research.” The paper begins with a real-life scenario that provided the motivation for developing the Virtual Design Team (VDT, an agent-based project organizational simulation tool to help managers design the work processes and organization of project teams engaged in large, semi-routine but complex and fast-paced projects. The paper sets out the underlying philosophy, representation, reasoning, and validation of VDT, and it concludes with suggestions for future research on computational modeling for organization design to extend the frontiers of organizational micro-contingency theory and expand the range of applicability and usefulness of design tools for project organizations and supply-chain networks based on this theory.

  13. An Empirical Study of Hospitality Management Student Attitudes toward Group Projects: Instructional Factors and Team Problems

    Science.gov (United States)

    Choi, Youngsoo; Ro, Heejung

    2012-01-01

    The development of positive attitudes in team-based work is important in management education. This study investigates hospitality students' attitudes toward group projects by examining instructional factors and team problems. Specifically, we examine how the students' perceptions of project appropriateness, instructors' support, and evaluation…

  14. Targeting relationally integrated project teams for sustainable PPPs

    OpenAIRE

    Kumaraswamy, M. M.; Ling, F. Y. Y.; Anvuur, A. M.; Rahman, M. M.

    2007-01-01

    Purpose – This paper targets the development of comprehensive approaches to prequalifying teams for Public Private Partnerships (PPPs). Design/methodology/approach – Research outcomes from a study into “relationally integrated project teams” (RIPTs) were applied to necessarily longer-term PPP scenarios. A force field model was developed to visualise the importance of stronger relational forces between the many PPP participants for “sustainable RIPTs” (SRITs). A framework was conceptualised to...

  15. Cohesion in Online Student Teams versus Traditional Teams

    Science.gov (United States)

    Hansen, David E.

    2016-01-01

    Researchers have found that the electronic methods in use for online team communication today increase communication quality in project-based work situations. Because communication quality is known to influence group cohesion, the present research examined whether online student project teams are more cohesive than traditional teams. We tested…

  16. Crew Resource Management (CRM video storytelling project: a team-based learning activity

    Directory of Open Access Journals (Sweden)

    Ma, Maggie Jiao

    2011-01-01

    Full Text Available This Crew Resource Management (CRM video storytelling project asks students to work in a team (4-5 people per team to create (write and produce a video story. The story should demonstrate lacking and ill practices of CRM knowledge and skills, or positive skills used to create a successful scenario in aviation (e. g. , flight training, commercial aviation, airport management. The activity is composed of two parts: (1 creating a video story of CRM in aviation, and (2 delivering a group presentation. Each tem creates a 5-8 minute long video clip of its story. The story must be originally created by the team to educate pilot and/or aviation management students on good practices of CRM in aviation. Accidents and incidents can be used as a reference to inspire ideas. However, this project is not to re-create any previous CRM accidents/incidents. The video story needs to be self-contained and address two or more aspects of CRM specified in the Federal Aviation Administration’s Advisory Circular 120-51. The presentation must include the use of PowerPoint or similar software and additional multimedia visual aids. The presentation itself will last no more than 17 minutes in length; including the actual video story (each group has additional 3 minutes to set up prior to the presentation. During the presentation following the video each team will discuss the CRM problems (or invite audience to identify CRM problems and explain what CRM practices were performed, and should have been performed. This presentation also should describe how each team worked together in order to complete this project (i. e. , good and bad CRM practiced

  17. uCollaborator: Framework for STEM Project Collaboration among Geographically-Dispersed Student/Faculty Teams

    Science.gov (United States)

    Fiore, Stephen M.; Rodriguez, Walter E.; Carstens, Deborah S.

    2012-01-01

    This paper presents a framework for facilitating communication among STEM project teams that are geographically dispersed in synchronous or asynchronous online courses. The framework has been developed to: (a) improve how engineering and technology students and faculty work with collocated and geographically-dispersed teams; and (b) to connect the…

  18. A Team Formation Framework for Managing Diversity in Multidisciplinary Engineering Project

    Directory of Open Access Journals (Sweden)

    Shawqi Mohammed Hossain

    2017-02-01

    Full Text Available Team formation is one of the essential elements in constructing effective teamwork of any team size that requires different skill sets. Diversity in team encourages students to challenge and compete with one another while searching for new ideas, which in turn can lead to a better team performance. In a well-functioning diverse teams, the students who performed poorly may gain benefit by observing how excellent students approach the assignments. They may also benefit by getting advice and assistance from the excellent students. Studies have shown that Malaysian university graduates lack of team skills. The purpose of this paper is to propose a framework for forming a diverse multidisciplinary team among engineering undergraduates based on selected criteria such as individual personality type, gender, and other relevant demographic information. The proposed framework can also be used to design an automated team-formation system based on the identified metrics. The purpose of the framework is to consolidate the existing team formation literature, and to develop and test interventions for maximizing individual member and team performance as a whole that makes an effective team. For this study, a multidisciplinary approach was used where first year engineering students from three different faculties, namely Faculty of Electrical Engineering (FKE, Faculty of Mechanical Engineering (FKM, and Faculty of Biosciences and Medical Engineering (FBME at Universiti Teknologi Malaysia (UTM worked on an innovation project using the Conceive, Design, Implement, and Operate (CDIO framework. Keirsey Temperament Sorter was used as an instrument to identify an individual's personality type.

  19. Team collaborative innovation management based on primary pipes automatic welding project

    International Nuclear Information System (INIS)

    Li Jing; Wang Dong; Zhang Ke

    2012-01-01

    The welding quality of primary pipe directly affects the safe operation of nuclear power plants. Primary pipe automatic welding, first of its kind in China, is a complex systematic project involving many facets, such as design, manufacturing, material, and on-site construction. A R and D team was formed by China Guangdong Nuclear Power Engineering Co., Ltd. (CNPEC) together with other domestic nuclear power design institutes, and manufacturing and construction enterprises. According to the characteristics of nuclear power plant construction, and adopting team collaborative innovation management mode, through project co-ordination, resources allocation and building production, education and research collaborative innovation platform, CNPEC successfully developed the primary pipe automatic welding technique which has been widely applied to the construction of nuclear power plant, creating considerable economic benefits. (authors)

  20. CERN's IT Consultancy Team: a new IT project support service

    CERN Multimedia

    Ignacio Reguero, IT Department

    2016-01-01

    Newly created IT Consultancy Team provides advice on IT matters to communities at CERN starting new projects or reviewing computing activities of old.   The members of CERN's IT Consultancy Team. The consultants share their knowledge and experience to improve awareness of the IT landscape at CERN and to advise on system architecture and design to ensure best usage of existing IT services and solutions that favour, and are compatible with, the infrastructure already in place. They also help to formalise requirements and assess impact on security, software licenses and cost, especially where contacts among different services are needed and questions go beyond the current computing service offerings. For instance, the IT consultants may help answering questions like the ones below: We are starting with project X – how could we make its computing aspects compatible with the CERN IT infrastructure? E.g. if you need a web content management system favour Drupal instead of Wor...

  1. Project Leader's Dual Socialization and Its Impact on Team Learning and Performance: A Diagnostic Study

    Science.gov (United States)

    Gautam, Tanvi

    2009-01-01

    One of the important challenges for leadership in project teams is the ability to manage the knowledge, communication and coordination related activities of team. In cross-team collaboration, different boundaries contribute to the situated nature of knowledge and hamper the flow of knowledge and prevent shared understanding with those on the other…

  2. Multicultural Ground Teams in Space Programs

    Science.gov (United States)

    Maier, M.

    2012-01-01

    In the early years of space flight only two countries had access to space. In the last twenty years, there have been major changes in how we conduct space business. With the fall of the iron curtain and the growing of the European Union, more and more players were able to join the space business and space science. By end of the last century, numerous countries, agencies and companies earned the right to be equal partners in space projects. This paper investigates the impact of multicultural teams in the space arena. Fortunately, in manned spaceflight, especially for long duration missions, there are several studies and simulations reporting on multicultural team impact. These data have not been as well explored on the team interactions within the ground crews. The focus of this paper are the teams working on the ISS project. Hypotheses will be drawn from the results of space crew research to determine parallels and differences for this vital segment of success in space missions. The key source of the data will be drawn from structured interviews with managers and other ground crews on the ISS project.

  3. The Competence for Project Team Members in the Conditions of Remote Working

    Directory of Open Access Journals (Sweden)

    Zdonek Iwona

    2017-02-01

    Full Text Available The article presents results of the qualitative research on competence of project team members in the conditions of remote working. These competences were considered in relation to different roles, which the members of such a team accept. The reference point to studied roles was the concept of Hansen and Allen authorships, and with regard to competence, the author's synthesis of deliberations above their models described in the literature.

  4. Exploring teams of learners becoming "WE" in the Intensive Care Unit--a focused ethnographic study.

    Science.gov (United States)

    Conte, Helen; Scheja, Max; Hjelmqvist, Hans; Jirwe, Maria

    2015-08-16

    Research about collaboration within teams of learners in intensive care is sparse, as is research on how the learners in a group develop into a team. The aim of this study was to explore the collaboration in teams of learners during a rotation in an interprofessional education unit in intensive care from a sociocultural learning perspective. Focused Ethnographic methods were used to collect data following eight teams of learners in 2009 and 2010. Each team consisted of one resident, one specialist nurse student and their supervisors (n = 28). The material consisted of 100 hours of observations, interviews, and four hours of sound recordings. A qualitative analysis explored changing patterns of interplay through a constant comparative approach. The learners' collaboration progressed along a pattern of participation common to all eight groups with a chronological starting point and an end point. The progress consisted of three main steps where the learners' groups developed into teams during a week's training. The supervisors' guided the progress by gradually stepping back to provide latitude for critical reflection and action. Our main conclusion in training teams of learners how to collaborate in the intensive care is the crucial understanding of how to guide them to act like a team, feel like a team and having the authority to act as a team.

  5. Geospace exploration project: Arase (ERG)

    Science.gov (United States)

    Miyoshi, Y.; Kasaba, Y.; Shinohara, I.; Takashima, T.; Asamura, K.; Matsumoto, H.; Higashio, N.; Mitani, T.; Kasahara, S.; Yokota, S.; Wang, S.; Kazama, Y.; Kasahara, Y.; Yagitani, S.; Matsuoka, A.; Kojima, H.; Katoh, Y.; Shiokawa, K.; Seki, K.; Fujimoto, M.; Ono, T.; ERG project Group

    2017-06-01

    The ERG (Exploration of energization and Radiation in Geospace) is Japanese geospace exploration project. The project focuses on relativistic electron acceleration mechanism of the outer belt and dynamics of space storms in the context of the cross-energy coupling via wave-particle interactions. The project consists of the satellite observation team, the ground-based network observation team, and integrated-data analysis/simulation team. The satellite was launched on December 20 2016 and has been nicknamed, “Arase”. This paper describes overview of the project and future plan for observations.

  6. Balancing creativity and time efficiency in multi-team R&D projects: The alignment of formal and informal networks

    DEFF Research Database (Denmark)

    Kratzer, Jan; Gemuenden, Hans Georg; Lettl, Christopher

    2008-01-01

    and their effect on the challenge to balance project creativity and time efficiency. In order to analyse this issue data in two multi-team R&D projects in space industry are collected. There are two intriguing findings that are partly contradicting the state-of-the art knowledge. First, formally ascribed design...... with the team's creativity, whereas it negatively impacts the team's time efficiency....

  7. Designing and Developing an Effective Safety Program for a Student Project Team

    Directory of Open Access Journals (Sweden)

    John Catton

    2018-05-01

    Full Text Available In the workplace, safety must be the first priority of all employers and employees alike. In order to maintain the safety and well-being of their employees, employers must demonstrate due diligence and provide the appropriate safety training to familiarize employees with the hazards within the workplace. Although, a student “project team” is not a business, the work done by students for their respective teams is synonymous with the work done in a place of business and thus requires that similar safety precautions and training be administered to students by their team leads and faculty advisors. They take on the role of supervisors within the team dynamic. Student teams often utilize the guidelines and policies that their universities or colleges have developed in order to build a set of standard operating procedures and safety training modules. These guidelines aid in providing a base for training for the team, however, they are no substitute for training specific to the safety risks associated with the work the team is doing. In order to comply with these requirements, a full analysis of the workplace is required to be completed. A variety of safety analysis techniques need to be applied to define the hazards within the workplace and institute appropriate measures to mitigate them. In this work, a process is developed for establishing a safety training program for a student project team, utilizing systems safety management techniques and the aspect of gamification to produce incentives for students to continue developing their skills. Although, systems safety management is typically applied to the design of active safety components or systems, the techniques for identifying and mitigating hazards can be applied in the same fashion to the workplace. They allow one to analyze their workplace and determine the hazards their employees might encounter, assign appropriate hazard ratings and segregate each respective hazard by their risks. In so

  8. Restructuring Vocational Special Needs Education through Interdisciplinary Team Effort: Local Motion in the Pacific Basin.

    Science.gov (United States)

    Smith, Garnett J.; Stodden, Robert A.

    1994-01-01

    The Restructuring through Interdisciplinary Team Effort project focuses on changing the culture and structure of vocational special needs education in the Pacific Basin. Its three dimensions are cognitive core (best practices, outcome-focused design, strategic planning); team network of stakeholders; and systemic renewal (school-to-work…

  9. Payment Mechanisms for Integrated Teams in Construction

    Directory of Open Access Journals (Sweden)

    Ibrahim Motawa

    2012-11-01

    Full Text Available The overwhelming consensus for process andteam integration has emerged as an enabler tomanage construction projects. Theperformance of integrated teams is highlyaffected by the adopted payment mechanism.However, the payment mechanisms availablefor a project may need the team tocompromise in order to agree on a fairmechanism for as many members as possible.This paper introduces a methodology tosimulate the profiles of alternative paymentmechanisms. The methodology aims to helpproject teams define the most appropriatemechanism for each member. The proposedmethodology is therefore novel and superior toexisting cash flow models where the focus hasbeen limited to main contractors only. Topromote its use as a performance enablingmechanism, the methodology utilizes “theproject process map”, “the stakeholders &supply chain”, “the pricing method” and “thepayment mechanism”. This will act as an aid todesign or “fine-tune” payment mechanisms toindividual projects characteristics consideringpayment for off-site materials andcomponents, which always concerns projectfabricators and supply chain.

  10. Structural equation modeling analysis of factors influencing architects' trust in project design teams

    Institute of Scientific and Technical Information of China (English)

    DING Zhi-kun; NG Fung-fai; WANG Jia-yuan

    2009-01-01

    This paper describes a structural equation modeling (SEM) analysis of factors influencing architects' trust in project design teams. We undertook a survey of architects, during which we distributed 193 questionnaires in 29 A-level architectural We used Amos 6.0 for SEM to identify significant personal construct based factors affecting interpersonal trust. The results show that only social interaction between architects significantly affects their interpersonal trust. The explained variance of trust is not very high in the model. Therefore, future research should add more factors into the current model. The practical implication is that team managers should promote the social interactions between team members such that the interpersonal trust level between team members can be improved.

  11. Transformational leadership and project success : The mediating role of team-building

    NARCIS (Netherlands)

    Aga, Deribe Assefa; Noorderhaven, Niels; Vallejo, Bertha

    2016-01-01

    Although the effect of transformational leadership on project success is empirically supported, less is known about the mechanisms that explain this effect. To address this issue, we propose the mediating role of team-building as a possible explanation of the relationship between transformational

  12. Groups Meet . . . Teams Improve: Building Teams That Learn

    Science.gov (United States)

    Hillier, Janet; Dunn-Jensen, Linda M.

    2013-01-01

    Although most business students participate in team-based projects during undergraduate or graduate course work, the team experience does not always teach team skills or capture the team members' potential: Students complete the task at hand but the explicit process of becoming a team is often not learned. Drawing from organizational learning…

  13. The Influence of Team Functioning and Workload on Sustainability of Trauma-Focused Evidence-Based Psychotherapies.

    Science.gov (United States)

    Mohr, David C; Rosen, Craig S; Schnurr, Paula P; Orazem, Robert J; Noorbaloochi, Siamak; Clothier, Barbara A; Eftekhari, Afsoon; Bernardy, Nancy C; Chard, Kathleen M; Crowley, Jill J; Cook, Joan M; Kehle-Forbes, Shannon M; Ruzek, Josef I; Sayer, Nina A

    2018-05-25

    It has been over a decade since the U.S. Department of Veterans Affairs (VA) began formal dissemination and implementation of two trauma-focused evidence-based psychotherapies (TF-EBPs). The objective of this study was to examine the sustainability of the TF-EBPs and determine whether team functioning and workload were associated with TF-EBP sustainability. This observational study used VA administrative data for 6,251 patients with posttraumatic stress disorder (PTSD) and surveys from 78 providers from 10 purposefully selected PTSD clinical teams located in nine VA medical centers. The outcome was sustainability of TF-EBPs, which was based on British National Health System Sustainability Index scores (possible scores range from 0 to 100.90). Primary predictors included team functioning, workload, and TB-EBP reach to patients with PTSD. Multiple linear regression models were used to examine the influence of team functioning and workload on TF-EBP sustainability after adjustment for covariates that were significantly associated with sustainability. Sustainability Index scores ranged from 53.15 to 100.90 across the 10 teams. Regression models showed that after adjustment for patient and facility characteristics, team functioning was positively associated (B=9.16, psustainability. There was considerable variation across teams in TF-EBP sustainability. The contribution of team functioning and workload to the sustainability of evidence-based mental health care warrants further study.

  14. Software Engineering Team Project - lessons learned

    Directory of Open Access Journals (Sweden)

    Bogumiła Hnatkowska

    2013-06-01

    Full Text Available In the 2010/11 academic year the Institute of Informatics at Wroclaw University of Technology issued ’Software Engineering Team Project’ as a course being a part of the final exam to earn bachelor’s degree. The main assumption about the course was that it should simulate the real environment (a virtual IT company for its participants. The course was aimed to introduce issues regarding programming in the medium scale, project planning and management. It was a real challenge as the course was offered for more than 140 students. The number of staff members involved in its preparation and performance was more than 15. The paper presents the lessons learned from the first course edition as well as more detailed qualitative and quantitative course assessment.

  15. Virtual Teaming and Collaboration Technology: A Study of Influences on Virtual Project Outcomes

    Science.gov (United States)

    Broils, Gary C.

    2014-01-01

    The purpose of this quantitative correlational study was to explore the relationships between the independent variables, contextual factors for virtual teams and collaboration technology, and the dependent variable, virtual project outcomes. The problem leading to the need for the study is a lower success rate for virtual projects compared to…

  16. Crew Resource Management (CRM) video storytelling project: a team-based learning activity

    OpenAIRE

    Ma, Maggie Jiao; Denando, John

    2011-01-01

    This Crew Resource Management (CRM) video storytelling project asks students to work in a team (4-5 people per team) to create (write and produce) a video story. The story should demonstrate lacking and ill practices of CRM knowledge and skills, or positive skills used to create a successful scenario in aviation (e. g. , flight training, commercial aviation, airport management). The activity is composed of two parts: (1) creating a video story of CRM in aviation, and (2) delivering a group pr...

  17. The Research of Self-Management Team and Superior-Direction Team in Team Learning Influential Factors

    OpenAIRE

    Zhang Wei

    2013-01-01

    Team learning is a cure for bureaucracy; it facilitates team innovation and team performance. But team learning occurs only when necessary conditions were met. This research focused on differences of team learning influential factors between self-management team and superior-direction team. Four variables were chosen as predictors of team learning though literature review and pilot interview. The 4 variables are team motivation, team trust, team conflict and team leadership. Selected 54 self ...

  18. The One Plan Project: A cooperative effort of the National Response Team and the Region 6 Regional Response Team to simplify facility emergency response planning

    International Nuclear Information System (INIS)

    Staves, J.; McCormick, K.

    1997-01-01

    The National Response Team (NRT) in coordination with the Region 6 Response Team (RRT) have developed a facility contingency plan format which would integrate all existing regulatory requirements for contingency planning. This format was developed by a multi-agency team, chaired by the USEPA Region 6, in conjunction with various industry, labor, and public interest groups. The impetus for this project came through the USEPA Office of Chemical Emergency Preparedness and Prevention (CEPPO). The current national oil and hazardous material emergency preparedness and response system is an amalgam of federal, state, local, and industrial programs which are often poorly coordinated. In a cooperative effort with the NRT, the CEPPO conducted a Presidential Review of federal agency authorities and coordination responsibilities regarding release prevention, mitigation, and response. Review recommendations led to a Pilot Project in USEPA Region 6. The Region 6 Pilot Project targeted end users in the intensely industrialized Houston Ship Channel (HSC) area, which is comprised of petroleum and petrochemical companies

  19. NORSTAR Project: Norfolk public schools student team for acoustical research

    Science.gov (United States)

    Fortunato, Ronald C.

    1987-01-01

    Development of the NORSTAR (Norfolk Public Student Team for Acoustical Research) Project includes the definition, design, fabrication, testing, analysis, and publishing the results of an acoustical experiment. The student-run program is based on a space flight organization similar to the Viking Project. The experiment will measure the scattering transfer of momentum from a sound field to spheres in a liquid medium. It is hoped that the experimental results will shed light on a difficult physics problem - the difference in scattering cross section (the overall effect of the sound wave scattering) for solid spheres and hollow spheres of differing wall thicknesses.

  20. Student Team Projects in Information Systems Development: Measuring Collective Creative Efficacy

    Science.gov (United States)

    Cheng, Hsiu-Hua; Yang, Heng-Li

    2011-01-01

    For information systems development project student teams, learning how to improve software development processes is an important training. Software process improvement is an outcome of a number of creative behaviours. Social cognitive theory states that the efficacy of judgment influences behaviours. This study explores the impact of three types…

  1. The Relationships between Work Team Strategic Intent and Work Team Performance

    National Research Council Canada - National Science Library

    Edison, Thomas R

    2007-01-01

    ...) executive level, six- week program management class in six different locations. The study not only underscores the significance of team focus on performance but also highlights how team characteristics affect team focus and performance...

  2. Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects

    Energy Technology Data Exchange (ETDEWEB)

    Sanders, Mark D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mathew, Paul [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-05-01

    This guide presents a process for three key activities for the building owner in preparing to retrofit existing commercial buildings: selecting project teams, benchmarking the existing building, and financing the retrofit work. Although there are other essential steps in the retrofit process, the three activities presented in this guide are the critical elements where the building owner has the greatest influence on the outcome of the project.

  3. Measuring Team Learning Behaviours through Observing Verbal Team Interaction

    Science.gov (United States)

    Raes, Elisabeth; Boon, Anne; Kyndt, Eva; Dochy, Filip

    2015-01-01

    Purpose: This study aims to explore, as an answer to the observed lack of knowledge about actual team learning behaviours, the characteristics of the actual observed basic team learning behaviours and facilitating team learning behaviours more in-depth of three project teams. Over time, team learning in an organisational context has been…

  4. Performance of student software development teams: the influence of personality and identifying as team members

    Science.gov (United States)

    Monaghan, Conal; Bizumic, Boris; Reynolds, Katherine; Smithson, Michael; Johns-Boast, Lynette; van Rooy, Dirk

    2015-01-01

    One prominent approach in the exploration of the variations in project team performance has been to study two components of the aggregate personalities of the team members: conscientiousness and agreeableness. A second line of research, known as self-categorisation theory, argues that identifying as team members and the team's performance norms should substantially influence the team's performance. This paper explores the influence of both these perspectives in university software engineering project teams. Eighty students worked to complete a piece of software in small project teams during 2007 or 2008. To reduce limitations in statistical analysis, Monte Carlo simulation techniques were employed to extrapolate from the results of the original sample to a larger simulated sample (2043 cases, within 319 teams). The results emphasise the importance of taking into account personality (particularly conscientiousness), and both team identification and the team's norm of performance, in order to cultivate higher levels of performance in student software engineering project teams.

  5. Effects of team emotional authenticity on virtual team performance

    Directory of Open Access Journals (Sweden)

    Catherine E Connelly

    2016-08-01

    Full Text Available Members of virtual teams lack many of the visual or auditory cues that are usually used as the basis for impressions about fellow team members. We focus on the effects of the impressions formed in this context, and use social exchange theory to understand how these impressions affect team performance. Our pilot study, using content analysis (n = 191 students, suggested that most individuals believe that they can assess others’ emotional authenticity in online settings by focusing on the content and tone of the messages. Our quantitative study examined the effects of these assessments. Structural equation modeling (SEM analysis (n = 81 student teams suggested that team-level trust and teamwork behaviors mediate the relationship between team emotional authenticity and team performance, and illuminate the importance of team emotional authenticity for team processes and outcomes.

  6. Team Foundation Server 2013 customization

    CERN Document Server

    Beeming, Gordon

    2014-01-01

    This book utilizes a tutorial based approach, focused on the practical customization of key features of the Team Foundation Server for collaborative enterprise software projects.This practical guide is intended for those who want to extend TFS. This book is for intermediate users who have an understanding of TFS, and basic coding skills will be required for the more complex customizations.

  7. Improving patient care through student leadership in team quality improvement projects.

    Science.gov (United States)

    Tschannen, Dana; Aebersold, Michelle; Kocan, Mary Jo; Lundy, Francene; Potempa, Kathleen

    2015-01-01

    In partnership with a major medical center, senior-level nursing students completed a root cause analysis and implementation plan to address a unit-specific quality issue. To evaluate the project, unit leaders were asked their perceptions of the value of the projects and impact on patient care, as well as to provide exemplars depicting how the student root cause analysis work resulted in improved patient outcome and/or unit processes. Liaisons noted benefits of having an RCA team, with positive impact on patient outcomes and care processes.

  8. Learning Cell Biology as a Team: A Project-Based Approach to Upper-Division Cell Biology

    Science.gov (United States)

    Wright, Robin; Boggs, James

    2002-01-01

    To help students develop successful strategies for learning how to learn and communicate complex information in cell biology, we developed a quarter-long cell biology class based on team projects. Each team researches a particular human disease and presents information about the cellular structure or process affected by the disease, the cellular…

  9. The link class project : Collaborative virtual teams between Peru and The Netherlands

    NARCIS (Netherlands)

    Olivos Rossini, L.M.; Rincon, Sandra; Rutkowski, Anne-Francoise

    2015-01-01

    The Link Class Project presented in this article provides an example of established collaborative group activities to negotiate and build a report together in virtual teams composed of students at Universidad ESAN, Lima (Peru) and Tilburg University, Tilburg (Netherlands). It further analyzes the

  10. Ties That Bind International Research Teams: A Network Multilevel Model of Interdisciplinary Collaboration

    Science.gov (United States)

    Kollasch, Aurelia Wiktoria

    2012-01-01

    Today large research projects require substantial involvement of researchers from different organizations, disciplines, or cultures working in groups or teams to accomplish a common goal of producing, sharing, and disseminating scientific knowledge. This study focuses on the international research team that was launched in response to pressing…

  11. Project work on wellbeing in multidisciplinary student teams : A triple testimonial on eps at artesis

    NARCIS (Netherlands)

    Rohaert, S.; Baelus, C.; Lacko, D.

    2012-01-01

    The European Project Semester (EPS) programme offers an educational framework to support students to practice problem-and project-based cross-disciplinary product innovation and research, in small multidisciplinary and international teams. To explore the potential and the restrictions of this

  12. Project team formation support for self-directed learners in social learning networks

    NARCIS (Netherlands)

    Spoelstra, Howard; Van Rosmalen, Peter; Sloep, Peter

    2012-01-01

    Spoelstra, H., Van Rosmalen, P., & Sloep, P. B. (2012). Project team formation support for self-directed learners in social learning networks. In P. Kommers, P. Isaias, & N. Bessis (Eds.), Proceedings of the IADIS International Conference on Web Based Communities and Social Media (ICWBC & SM 2012)

  13. Professional Scrum with Team Foundation Server 2010

    CERN Document Server

    Resnick, Steve; de la Maza, Michael

    2011-01-01

    Professional guidance on using Microsoft’s Visual Studio toolset for agile project management Focusing on both process and results, this professional guide offers a practical approach to running agile software projects using Visual Studio’s project management templates and tools. You’ll first get a thorough overview of the interaction between traditional, scrum-based agile development techniques and the Microsoft Soutions Framework, before drilling down into the detail. The book covers tools, best practices, key templates, key data, team and process models, necessary tracking

  14. Assessing and evaluating multidisciplinary translational teams: a mixed methods approach.

    Science.gov (United States)

    Wooten, Kevin C; Rose, Robert M; Ostir, Glenn V; Calhoun, William J; Ameredes, Bill T; Brasier, Allan R

    2014-03-01

    A case report illustrates how multidisciplinary translational teams can be assessed using outcome, process, and developmental types of evaluation using a mixed-methods approach. Types of evaluation appropriate for teams are considered in relation to relevant research questions and assessment methods. Logic models are applied to scientific projects and team development to inform choices between methods within a mixed-methods design. Use of an expert panel is reviewed, culminating in consensus ratings of 11 multidisciplinary teams and a final evaluation within a team-type taxonomy. Based on team maturation and scientific progress, teams were designated as (a) early in development, (b) traditional, (c) process focused, or (d) exemplary. Lessons learned from data reduction, use of mixed methods, and use of expert panels are explored.

  15. "Teamwork" or "Working as a Team"? The Theory and Practice of Top Team Working in UK Higher Education

    Science.gov (United States)

    Woodfield, Steve; Kennie, Tom

    2008-01-01

    This article focuses on the theory and practice of teamwork in "top management teams" in UK higher education institutions. It is informed by some of the key findings from a recent two-year research project sponsored by the Leadership Foundation for Higher Education that investigated the different ways in which UK higher education…

  16. [The mobile geriatrics team, global patient management].

    Science.gov (United States)

    Bach, Fréderiue; Bloch, Frédéric

    2013-01-01

    The mobile geriatric team of Cochin hospital in Paris is responsible for the management and orientation of fragile elderly patients over the age of 75 admitted to emergency departments. It carries out a multi-disciplinary assessment, contributes to the creation of the care project and life project of geriatric patients and is involved in organising the patient's return home. This article focuses on the role of the social assistant through two clinical cases.

  17. Librarians as Part of Cross-Disciplinary, Multi-Institutional Team Projects: Experiences from the VIVO Collaboration

    Science.gov (United States)

    Garcia-Milian, Rolando; Norton, Hannah F.; Auten, Beth; Davis, Valrie I.; Holmes, Kristi L.; Johnson, Margeaux; Tennant, Michele R.

    2013-01-01

    Cross-disciplinary, team-based collaboration is essential for addressing today’s complex research questions, and librarians are increasingly entering into such collaborations. This study identifies skills needed as librarians integrate into cross-disciplinary teams, based on the experiences of librarians involved in the development and implementation of VIVO, a research discovery and collaboration platform. Participants discussed the challenges, skills gained, and lessons learned throughout the project. Their responses were analyzed in the light of the science of team science literature, and factors affecting collaboration on the VIVO team were identified. Skills in inclusive thinking, communication, perseverance, adaptability, and leadership were found to be essential. PMID:23833333

  18. Formation of the Project Team on Introduction of Financial Controlling into Banking Activity

    Directory of Open Access Journals (Sweden)

    Chmutova Iryna M.

    2014-01-01

    Full Text Available The article identifies order and content of stages of formation of the project team of introduction of financial controlling into banking activity. It offers a procedure of identification of the qualitative team composition, which envisages selection of candidates with the use of rules of fuzzy logical conclusion for assessing three groups of competences: personal (initiative, communication ability, creative ability, purposefulness and responsibility; common managerial (ability to work in a team, ability to manage conflicts, ability to manage, strategic thinking ability, ability to plan team work and distribute rights and obligations and co-ordinate work; special managerial (ability to justify and make decisions under conditions of uncertainty and dynamism, analytical abilities, ability to master new directions and methods of work and use them, skills and ability to form justified recommendations, special knowledge – theoretical grounds and recommendations of modern science with respect to introduction of controlling.

  19. Strengths and weaknesses of working with the Global Trigger Tool method for retrospective record review: focus group interviews with team members.

    Science.gov (United States)

    Schildmeijer, Kristina; Nilsson, Lena; Perk, Joep; Arestedt, Kristofer; Nilsson, Gunilla

    2013-09-24

    The aim was to describe the strengths and weaknesses, from team member perspectives, of working with the Global Trigger Tool (GTT) method of retrospective record review to identify adverse events causing patient harm. A qualitative, descriptive approach with focus group interviews using content analysis. 5 Swedish hospitals in 2011. 5 GTT teams, with 5 physicians and 11 registered nurses. 5 focus group interviews were carried out with the five teams. Interviews were taped and transcribed verbatim. 8 categories emerged relating to the strengths and weaknesses of the GTT method. The categories found were: Usefulness of the GTT, Application of the GTT, Triggers, Preventability of harm, Team composition, Team tasks, Team members' knowledge development and Documentation. Gradually, changes in the methodology were made by the teams, for example, the teams reported how the registered nurses divided up the charts into two sets, each being read respectively. The teams described the method as important and well functioning. Not only the most important, but also the most difficult, was the task of bringing the results back to the clinic. The teams found it easier to discuss findings at their own clinics. The GTT method functions well for identifying adverse events and is strengthened by its adaptability to different specialties. However, small, gradual methodological changes together with continuingly developed expertise and adaption to looking at harm from a patient's perspective may contribute to large differences in assessment over time.

  20. Leader evaluation and team cohesiveness in the process of team development: A matter of gender?

    Directory of Open Access Journals (Sweden)

    Núria Rovira-Asenjo

    Full Text Available Leadership positions are still stereotyped as masculine, especially in male-dominated fields (e.g., engineering. So how do gender stereotypes affect the evaluation of leaders and team cohesiveness in the process of team development? In our study participants worked in 45 small teams (4-5 members. Each team was headed by either a female or male leader, so that 45 leaders (33% women supervised 258 team members (39% women. Over a period of nine months, the teams developed specific engineering projects as part of their professional undergraduate training. We examined leaders' self-evaluation, their evaluation by team members, and team cohesiveness at two points of time (month three and month nine, the final month of the collaboration. While we did not find any gender differences in leaders' self-evaluation at the beginning, female leaders evaluated themselves more favorably than men at the end of the projects. Moreover, female leaders were evaluated more favorably than male leaders at the beginning of the project, but the evaluation by team members did not differ at the end of the projects. Finally, we found a tendency for female leaders to build more cohesive teams than male leaders.

  1. Leader evaluation and team cohesiveness in the process of team development: A matter of gender?

    Science.gov (United States)

    Sczesny, Sabine; Gumí, Tània; Guimerà, Roger; Sales-Pardo, Marta

    2017-01-01

    Leadership positions are still stereotyped as masculine, especially in male-dominated fields (e.g., engineering). So how do gender stereotypes affect the evaluation of leaders and team cohesiveness in the process of team development? In our study participants worked in 45 small teams (4–5 members). Each team was headed by either a female or male leader, so that 45 leaders (33% women) supervised 258 team members (39% women). Over a period of nine months, the teams developed specific engineering projects as part of their professional undergraduate training. We examined leaders’ self-evaluation, their evaluation by team members, and team cohesiveness at two points of time (month three and month nine, the final month of the collaboration). While we did not find any gender differences in leaders’ self-evaluation at the beginning, female leaders evaluated themselves more favorably than men at the end of the projects. Moreover, female leaders were evaluated more favorably than male leaders at the beginning of the project, but the evaluation by team members did not differ at the end of the projects. Finally, we found a tendency for female leaders to build more cohesive teams than male leaders. PMID:29059231

  2. Effects of interdependencies in project teams

    NARCIS (Netherlands)

    Van der Vegt, G.S.; Emans, B.J.M.; Van de Vliert, E.

    The associations between task interdependence, outcome interdependence, and the effectiveness of team members were examined. The sample consisted of 181 employees at 10 engineering companies in The Netherlands. The participants evaluated their interdependence with 1 specific team member and rated

  3. Collective regulatory focus predicts specific aspects of team innovation

    NARCIS (Netherlands)

    Rietzschel, E.F.

    Much innovative work in organizations takes place in teams. Because organizational demands are complex and resources are limited, teams need to regulate their collective efforts to perform optimally. Based on previous research and a stage-based approach to innovation, it was hypothesized that

  4. Managing MDO Software Development Projects

    Science.gov (United States)

    Townsend, J. C.; Salas, A. O.

    2002-01-01

    Over the past decade, the NASA Langley Research Center developed a series of 'grand challenge' applications demonstrating the use of parallel and distributed computation and multidisciplinary design optimization. All but the last of these applications were focused on the high-speed civil transport vehicle; the final application focused on reusable launch vehicles. Teams of discipline experts developed these multidisciplinary applications by integrating legacy engineering analysis codes. As teams became larger and the application development became more complex with increasing levels of fidelity and numbers of disciplines, the need for applying software engineering practices became evident. This paper briefly introduces the application projects and then describes the approaches taken in project management and software engineering for each project; lessons learned are highlighted.

  5. Capstone Interdisciplinary Team Project: A Requirement for the MS in Sustainability Degree

    Science.gov (United States)

    Jiji, Latif M.; Schonfeld, Irvin Sam; Smith, George A.

    2015-01-01

    Purpose: This paper aims to describe experience gained with a required six-credit year-long course, the Capstone Interdisciplinary Team Project, a key component of the Master of Science (MS) in Sustainability degree at the City College of New York. A common feature of sustainability problems is their interdisciplinary nature. Solutions to…

  6. Can I Trust You? Profile Elements that Inform First Impressions of Trustworthiness in Virtual Project Teams

    NARCIS (Netherlands)

    Rusman, Ellen; Van Bruggen, Jan; Sloep, Peter; Valcke, Martin; Koper, Rob

    2010-01-01

    Rusman, E., Van Bruggen, J., Sloep, P. B., Valcke, M., & Koper, R. (2012). Can I Trust You? Profile Elements that Inform First Impressions of Trustworthiness in Virtual Project Teams. International Journal of Information Technology Project Management (IJITPM), 3(1), 15-35.

  7. Project-Based Learning and Design-Focused Projects to Motivate Secondary Mathematics Students

    Science.gov (United States)

    Remijan, Kelly W.

    2017-01-01

    This article illustrates how mathematics teachers can develop design-focused projects, related to project-based learning, to motivate secondary mathematics students. With first-hand experience as a secondary mathematics teacher, I provide a series of steps related to the engineering design process, which are helpful to teachers in developing…

  8. Beautiful Teams Inspiring and Cautionary Tales from Veteran Team Leaders

    CERN Document Server

    Stellman, Andrew

    2009-01-01

    What's it like to work on a great software development team facing an impossible problem? How do you build an effective team? Beautiful Teams takes you behind the scenes with some of the most interesting teams in software engineering history. You'll learn from veteran team leaders' successes and failures, told through a series of engaging personal stories -- and interviews -- by leading programmers, architects, project managers, and thought leaders.

  9. Low Emissions Alternative Power (LEAP) Project Office Business Team of the Aeropropulsion Research Program Office (ARPO) Org. 0140

    Science.gov (United States)

    Buttler, Jennifer A.

    2004-01-01

    The program for which I am working at this summer is Propulsion and Power/Low Emissions Alternative Power (P&P/LEAP). It invests in a fundamental TRL 1-6 research and technology portfolio that will enable the future of: Alternative fuels and/or alternative propulsion systems, non-combustion (electric) propulsion systems. P&P/LEAP will identify and capitalize on the highest potential concepts generated both internal and external to the Agency. During my 2004 summer at NASA Glenn Research Center, I worked with my mentor Barbara Mader, in the Project Office with the Business Team completing various tasks for the project and personnel. The LEAP project is a highly matrixed organization. The Project Office is responsible for the goals advocacy and dollar (budget) of the LEAP project. The objectives of the LEAP Project are to discover new energy sources and develop unconventional engines and power systems directed towards greatly reduced emissions, enable new vehicle concepts for public mobility, new science missions and national security. The Propulsion and PowerLow Emissions Alternative Power directly supports the environmental, mobility, national security objectives of the Vehicle Systems Program and the Aeronautics Technology Theme. Technology deliverables include the demonstration through integrated ground tests, a constant volume combustor in an engine system, and UAV/small transport aircraft all electric power system. My mentor serves as a key member of the management team for the Aeropropulsion Research Program Office (ARPO). She has represented the office on numerous occasions, and is a member of a number of center-wide panels/teams, such as the Space management Committee and is chair to the Business Process Consolidation Team. She is responsible for the overall coordination of resources for the Propulsion and Power Project - from advocacy to implementation. The goal for my summer at NASA was to document processes and archive program documents from the past

  10. One step ahead of technology Cern and HP - an ideal team project

    CERN Multimedia

    Garvey, Kelsey

    2009-01-01

    "In 2004, the It team at Cern recognized the comprehensiveness and future of the LHC Computing Grid Project and realized that the IT infrastructures were not sufficient enough to manage the data. Cern therefore partnered with HP ProCurve the following year to minimize the day-to-day workload and improve infrastructure for data output" (1 page)

  11. Study on team evaluation. Team process model for team evaluation

    International Nuclear Information System (INIS)

    Sasou Kunihide; Ebisu, Mitsuhiro; Hirose, Ayako

    2004-01-01

    Several studies have been done to evaluate or improve team performance in nuclear and aviation industries. Crew resource management is the typical example. In addition, team evaluation recently gathers interests in other teams of lawyers, medical staff, accountants, psychiatrics, executive, etc. However, the most evaluation methods focus on the results of team behavior that can be observed through training or actual business situations. What is expected team is not only resolving problems but also training younger members being destined to lead the next generation. Therefore, the authors set the final goal of this study establishing a series of methods to evaluate and improve teams inclusively such as decision making, motivation, staffing, etc. As the first step, this study develops team process model describing viewpoints for the evaluation. The team process is defined as some kinds of power that activate or inactivate competency of individuals that is the components of team's competency. To find the team process, the authors discussed the merits of team behavior with the experienced training instructors and shift supervisors of nuclear/thermal power plants. The discussion finds four team merits and many components to realize those team merits. Classifying those components into eight groups of team processes such as 'Orientation', 'Decision Making', 'Power and Responsibility', 'Workload Management', 'Professional Trust', 'Motivation', 'Training' and 'staffing', the authors propose Team Process Model with two to four sub processes in each team process. In the future, the authors will develop methods to evaluate some of the team processes for nuclear/thermal power plant operation teams. (author)

  12. Focusing innovation projects on promoting well-being: A toolkit

    NARCIS (Netherlands)

    Steen, M.G.D.; Luiten, H.

    2014-01-01

    Increasingly, private and public organizations are organizing innovation projects that aim to promote people’s wellbeing. In order to better focus such projects on this goal, we developed a (prototype) tool, based on the Capability Approach (CA). It is intended to help people in innovation projects

  13. The Challenges and Enhancing Opportunities of Global Project Management: Evidence from Chinese and Dutch Cross-Cultural Project Management

    OpenAIRE

    Zhang, Ying; Marquis, Christopher G; Filippov, Sergey; Haasnoot, Henk-Jan; van der Steen, Martijn

    2015-01-01

    This study investigates the role of national and organisational culture in day-to-day activities of multinational project teams, specifically focusing on differences between Chinese and Dutch project managers. We rely on fieldwork observation and interviews with representatives from a diverse set of organizations in China and the Netherlands. Analyses focus on the impact of cultural differences on five project management processes – (1) project planning, (2) cost and quality management, (3) r...

  14. Tinkering self-efficacy and team interaction on freshman engineering design teams

    Science.gov (United States)

    Richardson, Arlisa Labrie

    This study utilizes Bandura's theory of self-efficacy as a framework to examine the development of tinkering skills white working on a freshman engineering design team. The four sources of self-efficacy were analyzed in the context of tinkering within the design team. The research question, 'Does tinkering self-efficacy change for female students during the Freshman Engineering Design class while working on mixed sex teams?', was addressed using quantitative data collection and field observations. Approximately 41 students enrolled in a freshman engineering design class at a public university in the southwest participated by providing self-reports about their tinkering involvement during each design project. In addition, three mixed-sex student teams were observed while working to complete the course design projects. An observation protocol based on Bandura's sources of self efficacy, was used to document tinkering interactions within the three observed teams. The results revealed that Bandura's sources of self-efficacy influenced tinkering involvement. The self-efficacy source, performance accomplishment measured through prior tinkering experience, was the most influential on tinkering involvement. Unlike Bandura's ranking of influence, verbal persuasion was shown to correlate with more tinkering behaviors than the observation of others. The number of females on a team had no impact on tinkering involvement. Tinkering involvement did not change as students progressed from one project to another. However, the competitive nature of the design project appeared to have a negative impact on tinkering involvement and the division of tasks within the team. In addition, a difference was found in the female students' perception of their tinkering involvement and observation of their tinkering involvement. The findings suggest that effective implementation of teamwork including teamwork preparation, more emphasis on the design process and the elimination of competition

  15. Teaching Engineering Students Team Work

    Science.gov (United States)

    Levi, Daniel

    1998-01-01

    The purpose of this manual is to provide professor's in engineering classes which the background necessary to use student team projects effectively. This manual describes some of the characteristics of student teams and how to use them in class. It provides a set of class activities and films which can be used to introduce and support student teams. Finally, a set of teaching modules used in freshmen, sophomore, and senior aeronautical engineering classes are presented. This manual was developed as part of a NASA sponsored project to improve the undergraduate education of aeronautical engineers. The project has helped to purchase a set of team work films which can be checked out from Cal Poly's Learning Resources Center in the Kennedy Library. Research for this project has included literature reviews on team work and cooperative learning; interviews, observations, and surveys of Cal Poly students from Industrial and Manufacturing Engineering, Aeronautical Engineering and Psychology; participation in the Aeronautical Engineering senior design lab; and interviews with engineering faculty. In addition to this faculty manual, there is a student team work manual which has been designed to help engineering students work better in teams.

  16. Project T.E.A.M. (Technical Education Advancement Modules). Advanced Statistical Process Control.

    Science.gov (United States)

    Dunlap, Dale

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 20-hour advanced statistical process control (SPC) and quality improvement course designed to develop the following competencies: (1) understanding quality systems; (2) knowing the process; (3) solving quality problems; and (4)…

  17. Learning to Argue with Intermediate Macro Theory: A Semester-Long Team Writing Project

    Science.gov (United States)

    Strasser, Georg; Wolfe, Marketa Halova

    2014-01-01

    The authors describe their experience with integrating a semester-long economic analysis project into an intermediate macroeconomic theory course. Students work in teams of "economic advisors" to write a series of nested reports that analyze the current state of the economy, and propose and evaluate policies for a decision-maker. The…

  18. White Paper on the Use of Team Calendars with the JIRA Issue Tracking System and Confluence Collaboration Tools for the xLPR Project

    Energy Technology Data Exchange (ETDEWEB)

    Klasky, Hilda B. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Williams, Paul T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bass, Bennett Richard [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2012-09-01

    ORNL was tasked by xLPR project management to propose a team calendar for use within the xLPR consortium. Among various options that were considered, the approach judged by ORNL to best fit the needs of the xLPR project is presented in this document. The Atlassian Team Calendars plug-in used with the Confluence collaboration tool was recommended for several reasons, including the advantage that it provides for a tight integration between Confluence (found at https://xlpr.ornl.gov/wiki ) and xLPR s JIRA issue tracking system (found at https://xlpr.ornl.gov/jira ). This document is divided into two parts. The first part (Sections 1-6) consists of the white paper, which highlights some of the ways that Team Calendars can improve com mun ication between xLPR project managers, group leads, and team members when JIRA is applied for both issue tracking and change-management activities. Specific points emphasized herein are as follows: The Team Calendar application greatly enhances the added value that the JIRA and Confluence tools bring to the xLPR Project. The Team Calendar can improve com mun ication between xLPR project managers, group leads, and team members when JIRA is applied for both issue tracking and change-management activities. The Team Calendar works across different email tools such as Outlook 2011, Outlook 2010, Outlook 2007, Google Calendars and Mac s iCalendar to name a few. xLPR users can now access the wiki Confluence (with embedded Team Calendars) directly from JIRA without having to re-validate their login. The second part consists of an Annex (Section 7), which describes how users can subscribe to Team Calendars from different calendar applications. Specific instructions are given in the Annex that describe how to Import xLPR Team Calendar to Outlook Version Office 2010 Import xLPR Team Calendar to Outlook Version Office 2007 Subscribe to Team Calendar from Google Calendar The reader is directed to Section 4 for instructions on adding events to the

  19. Evaluation of a Pilot Project to Introduce Simulation-Based Team Training to Pediatric Surgery Trauma Room Care

    Directory of Open Access Journals (Sweden)

    Markus Lehner

    2017-01-01

    Full Text Available Introduction. Several studies in pediatric trauma care have demonstrated substantial deficits in both prehospital and emergency department management. Methods. In February 2015 the PAEDSIM collaborative conducted a one and a half day interdisciplinary, simulation based team-training course in a simulated pediatric emergency department. 14 physicians from the medical fields of pediatric surgery, pediatric intensive care and emergency medicine, and anesthesia participated, as well as four pediatric nurses. After a theoretical introduction and familiarization with the simulator, course attendees alternately participated in six simulation scenarios and debriefings. Each scenario incorporated elements of pediatric trauma management as well as Crew Resource Management (CRM educational objectives. Participants completed anonymous pre- and postcourse questionnaires and rated the course itself as well as their own medical qualification and knowledge of CRM. Results. Participants found the course very realistic and selected scenarios highly relevant to their daily work. They reported a feeling of improved medical and nontechnical skills as well as no uncomfortable feeling during scenarios or debriefings. Conclusion. To our knowledge this pilot-project represents the first successful implementation of a simulation-based team-training course focused on pediatric trauma care in German-speaking countries with good acceptance.

  20. Developing a minimum dataset for nursing team leader handover in the intensive care unit: A focus group study.

    Science.gov (United States)

    Spooner, Amy J; Aitken, Leanne M; Corley, Amanda; Chaboyer, Wendy

    2018-01-01

    Despite increasing demand for structured processes to guide clinical handover, nursing handover tools are limited in the intensive care unit. The study aim was to identify key items to include in a minimum dataset for intensive care nursing team leader shift-to-shift handover. This focus group study was conducted in a 21-bed medical/surgical intensive care unit in Australia. Senior registered nurses involved in team leader handovers were recruited. Focus groups were conducted using a nominal group technique to generate and prioritise minimum dataset items. Nurses were presented with content from previous team leader handovers and asked to select which content items to include in a minimum dataset. Participant responses were summarised as frequencies and percentages. Seventeen senior nurses participated in three focus groups. Participants agreed that ISBAR (Identify-Situation-Background-Assessment-Recommendations) was a useful tool to guide clinical handover. Items recommended to be included in the minimum dataset (≥65% agreement) included Identify (name, age, days in intensive care), Situation (diagnosis, surgical procedure), Background (significant event(s), management of significant event(s)) and Recommendations (patient plan for next shift, tasks to follow up for next shift). Overall, 30 of the 67 (45%) items in the Assessment category were considered important to include in the minimum dataset and focused on relevant observations and treatment within each body system. Other non-ISBAR items considered important to include related to the ICU (admissions to ICU, staffing/skill mix, theatre cases) and patients (infectious status, site of infection, end of life plan). Items were further categorised into those to include in all handovers and those to discuss only when relevant to the patient. The findings suggest a minimum dataset for intensive care nursing team leader shift-to-shift handover should contain items within ISBAR along with unit and patient specific

  1. Investigating Antecedents of Task Commitment and Task Attraction in Service Learning Team Projects

    Science.gov (United States)

    Schaffer, Bryan S.; Manegold, Jennifer G.

    2018-01-01

    The authors investigated the antecedents of team task cohesiveness in service learning classroom environments. Focusing on task commitment and task attraction as key dependent variables representing cohesiveness, and task interdependence as the primary independent variable, the authors position three important task action phase processes as…

  2. Quality Interaction Between Mission Assurance and Project Team Members

    Science.gov (United States)

    Kwong-Fu, Helenann H.; Wilson, Robert K.

    2006-01-01

    Mission Assurance independent assessments started during the development cycle and continued through post launch operations. In operations, Health and Safety of the Observatory is of utmost importance. Therefore, Mission Assurance must ensure requirements compliance and focus on process improvements required across the operational systems including new/modified products, tools, and procedures. The deployment of the interactive model involves three objectives: Team member Interaction, Good Root Cause Analysis Practices, and Risk Assessment to avoid reoccurrences. In applying this model, we use a metric based measurement process and was found to have the most significant effect, which points to the importance of focuses on a combination of root cause analysis and risk approaches allowing the engineers the ability to prioritize and quantify their corrective actions based on a well-defined set of root cause definitions (i.e. closure criteria for problem reports), success criteria and risk rating definitions.

  3. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al.

    Energy Technology Data Exchange (ETDEWEB)

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D. [Nuclear Regulatory Commission, Washington, DC (United States)

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation.

  4. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al

    International Nuclear Information System (INIS)

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D.

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation

  5. Contribution of Full-Scope Simulator Development Project to the Dissemination of Nuclear Knowledge within New-Build–Project Teams

    International Nuclear Information System (INIS)

    Gain, P.

    2016-01-01

    Full text: In a context where few countries recently carried out nuclear new-build projects combined with very strong need for generation renewal, there exists a major stake for the training of the hundreds of engineers who are involved in the design and commissioning teams of this highly complex industrial facility. The Simulator project, which gives the first opportunity for integration and validation of the whole of the design data, to check their coherence, the good performance with the interface and conformity with the safety and performance requirements, allows a fast and effective competence rise of all the resources involved in its development. In addition, the phased availability of the whole of data generally results in having several phased versions of the simulator. Each can then be deployed in great number for training drills which also will contribute to share in optimal way knowledge on the reference plant design. This contexts of broader use of these training modules and use of simulation in support of the engineering activities lead to their use by many teams with varied profiles; and there too, the simulation technologies are of a remarkable effectiveness to share a common and stable knowledge management. (author

  6. Supply chain partnership in construction a field study on project team level factors

    NARCIS (Netherlands)

    Koolwijk, J.S.J.; Van Oel, C.J.; Wamelink, J.W.F.

    2015-01-01

    People and their relationship are at the heart of supply chain partnerships, however there is a lack of qualitative studies focusing on how integrated relationships may be developed. Therefore, the purpose of this study was to conduct field research to deepen our understanding of team level

  7. Group, Team, or Something in Between? Conceptualising and Measuring Team Entitativity

    Science.gov (United States)

    Vangrieken, Katrien; Boon, Anne; Dochy, Filip; Kyndt, Eva

    2017-01-01

    The current gap between traditional team research and research focusing on non-strict teams or groups such as teacher teams hampers boundary-crossing investigations of and theorising on teamwork and collaboration. The main aim of this study includes bridging this gap by proposing a continuum-based team concept, describing the distinction between…

  8. Focusing Information Systems Post-Graduate Research Projects

    Directory of Open Access Journals (Sweden)

    Gail Ridley

    1996-11-01

    Full Text Available This paper reports on an investigation of mechanisms that assist Information Systems post-graduate research students to focus their projects. An evaluation is presented of the experiences of Information Systems research students in focussing their research projects based on a survey conducted of students who participated in two of the first three Information Systems doctoral consortia to be held in Australia. The survey sought to determine whether a doctoral consortium or 'systematic expert review' is the most valuable mechanism for focussing a research proposal. Systematic expert review was considered by the students to be more effective than the doctoral consortium process for the purpose of focussing their research project proposals.

  9. The Link Class Project: Collaborative virtual teams between Peru and The Netherlands

    OpenAIRE

    Mariella Olivos Rossini; Sandra Rincón; Anne-Francoise Rutkowski

    2015-01-01

    The Link Class Project presented in this article provides an example of established collaborative group activities to negotiate and build a report together in virtual teams composed of students at Universidad ESAN, Lima (Peru) and Tilburg University, Tilburg (Netherlands). It further analyzes the effects of a campus based internationalization strategy supported by the use of technology. Based on previous experiences with virtual classrooms, the authors adhere to the ancient Chinese philosophe...

  10. The Motivated Project Team

    Science.gov (United States)

    2009-12-01

    Financial incentives that match level of achievement • Regular, constructive feedback. Hierarchy of Needs ( Abraham H. Maslow ) Team members can be...Much has been written regarding motivational Defense AT&L: November-December 2009 58 theory . To further complicate mat- ters, some motivational... theories clearly contradict others, and a manager’s ability to motivate is, to no small degree, related to his or her leadership approach and inter

  11. EC FP6 Siberia-focused Enviro-RISKS Project and its Outcomes

    Science.gov (United States)

    Baklanov, A. A.; Gordov, E. P.

    2009-04-01

    The FP6 Project "Man-induced Environmental Risks: Monitoring, Management and Remediation of Man-made Changes in Siberia" (Enviro-RISKS) strategic objective is to facilitate elaboration of solid scientific background and understanding of man-made associated environmental risks, their influence on all aspects of regional environment and optimal ways for it remediation by means of coordinated initiatives of a range of relevant RTD projects as well as to achieve their improved integration thus giving the projects additional synergy in current activities and potential for practical applications. List of Partners includes 3 leading European research organizations, 6 leading Russian research organizations (5 - located in Siberia) and 1 organization from Kazakhstan. Additionally several Russian and European research organizations joined to the Project as Associated Partners. Scientific background and foundation for the project performance is formed by a number of different levels RTD projects carried out by Partners and devoted to near all aspects of the theme. The set comprise coordinated/performed by partners EC funded thematic international projects, Russian national projects and other projects performed by NIS partners. Project outcomes include, in particular, development and support of the bilingual Enviro-RISKS web portal (http://risks.scert.ru/) as the major tool for disseminations of environmental information and project results; achieved level of development of Siberia Integrated Regional Study (SIRS, http://sirs.scert.ru/), which is the Siberia-focused NEESPI Environmental Mega-Project ongoing under the auspices of the Siberian Branch of the Russian Academy of Sciences. The main Project outcome are Memorandum on the state of the art of environmental RTD activity in Siberia and Recommendations on future environmental RTD activity in Siberia elaborated by four Working Experts Groups working in most important for Siberia Thematic Focuses. Three Thematic Focuses

  12. Teaming up

    DEFF Research Database (Denmark)

    Warhuus, Jan; Günzel-Jensen, Franziska; Robinson, Sarah

    2016-01-01

    types of team formation: random teacher pre-assigned, student selection, and teacher directed diversity. In each of these modules, ethnographic methods (interviews and observations) were employed. Additionally, we had access to students learning logs, formative and summative assessments, and final exams...... functioning entrepreneurial student teams as most teams lack personal chemistry which makes them anchor their work too much in a pre-defined project. In contrast, we find that students that can form their own teams aim for less diverse teams than what is achieved by random assignment. However, the homophily......Questions we care about (Objectives): When students have to work on challenging tasks, as it is often the case in entrepreneurship classrooms that leverage experiential learning, team success becomes central to the students learning. Yet, the formation of teams is often left up to the students...

  13. Hamline/3M Corp. Project: Liason for Curricular Change*

    Science.gov (United States)

    Artz, Jerry L.

    2002-04-01

    This project was designed to catalyze curricular changes to better prepare students for the workplace. Industrial managers provided a list of 16 characteristics valued in the workplace; most were NOT related to science course content. The project formed 5 teams each including 3M professionals and students. Each team developed curricular changes in one of the 16 areas. Team goals were to improve skills in communication, data analysis, business/economics, team problem solving, and cultural competency. Curricular changes realized include communication skill activities embodied in science courses and faculty communication teaching skill seminars; self learning tools in data analysis, statistics and model building; a new course developed with assistance from 3M personnel focusing on topics directly related to technological industries; high performance team problem solving training/coaching for faculty; workshops for students and faculty relative to importance of cultural competencies in the workplace; and a new course focusing on culture, team problem solving and conflict resolution in the technical workplace. Process for developing and content of curricular changes will be reported. *Thanks to: NSF GOALI CHE-99010782

  14. Overlapping Boundaries of the Project Time Management and Project Risk Management

    Directory of Open Access Journals (Sweden)

    Marius PODEAN

    2010-01-01

    Full Text Available Based on utility function, milestones during project and/or the end of projects or programme may be categorized in what are called soft-deadline and hard-deadline. In contrast with the soft-end projects, the hard-end projects posses a decrease of utility function with a vertical asymptote character around the deadline for project completion. In extreme situations, the utility function itself may fall under zero (projects may generate losses to both constructor and customer. Existing risk analysis methodologies observe risks from monetary terms. The typical risks are correlated with an increase in final project costs. In order to estimate harddeadline milestones and/or end of projects or programme is critical to employ the time dimension rather than the typical cost-based risk analysis. Here, we comprehensively describe a structured methodology that focuses on minimizing and mitigating project specific delay risks. The method may supplement existing cost-based risk analysis in projects. We aim to elegantly combine moderation techniques to reveal the intrinsic risk of the projects. In addition to the technical risks, the moderation techniques are able to bring evidence of risks as the team efficacy, diverse un-correlations or miss-understanding about the roles of the team members in the team – most of the project soft risk. Described methodology encourages the common understanding of risks for participants, crystallizing the essence of what can go wrong in complex situations and where the opportunities can be unlocked.

  15. Problem based Learning versus Design Thinking in Team based Project work

    DEFF Research Database (Denmark)

    Denise J. Stokholm, Marianne

    2014-01-01

    project based learning issues, which has caused a need to describe and compare the two models; in specific the understandings, approaches and organization of learning in project work. The PBL model viewing the process as 3 separate project stages including; problem analysis, problem solving and project......All educations at Aalborg University has since 1974 been rooted in Problem Based Learning (PBL). In 1999 a new education in Industrial design was set up, introducing Design Based Learning (DBL). Even though the two approaches have a lot in common they also hold different understandings of core...... report, with focus on problem solving through analysis. Design Based Learning viewing the process as series of integrated design spaces including; alignment, research, mission, vision, concept, product and process report, with focus on innovative ideation though integration. There is a need of renewing...

  16. ELECTRICAL SAFETY IMPROVEMENT PROJECT A COMPLEX WIDE TEAMING INITIATIVE

    Energy Technology Data Exchange (ETDEWEB)

    GRAY BJ

    2007-11-26

    This paper describes the results of a year-long project, sponsored by the Energy Facility Contractors Group (EFCOG) and designed to improve overall electrical safety performance throughout Department of Energy (DOE)-owned sites and laboratories. As evidenced by focused metrics, the Project was successful primarily due to the joint commitment of contractor and DOE electrical safety experts, as well as significant support from DOE and contractor senior management. The effort was managed by an assigned project manager, using classical project-management principles that included execution of key deliverables and regular status reports to the Project sponsor. At the conclusion of the Project, the DOE not only realized measurable improvement in the safety of their workers, but also had access to valuable resources that will enable them to do the following: evaluate and improve electrical safety programs; analyze and trend electrical safety events; increase electrical safety awareness for both electrical and non-electrical workers; and participate in ongoing processes dedicated to continued improvement.

  17. Team-client Relationships And Extreme Programming

    Directory of Open Access Journals (Sweden)

    John Karn

    2008-01-01

    Full Text Available This paper describes a study that examined the relationship between software engineering teams who adhered to the extreme programming (XP methodology and their project clients. The study involved observing teams working on projects for clients who had commissioned a piece of software to be used in the real world. Interviews were conducted during and at the end of the project to get client opinion on how the project had progressed. Of interest to the researchers were opinions on frequency of feedback, how the team captured requirements, whether or not the iterative approach of XP proved to be helpful, and the level of contextual and software engineering knowledge the client had at the start of the project. In theory, fidelity to XP should result in enhanced communication, reduce expectation gaps, and lead to greater client satisfaction. Our results suggest that this depends heavily on the communication skills of the team and of the client, the expectations of the client, and the nature of the project.

  18. Project risk as identity threat: explaining the development and consequences of risk discourse in an infrastructure project

    NARCIS (Netherlands)

    van Os, A.; van Berkel, F.J.F.W.; de Gilder, T.C.; van Dyck, C.; Groenewegen, P.

    2015-01-01

    This paper explores the role of social identity threat in risk discourse in an infrastructure project, and the consequences risk discourse has for cooperation between stakeholders. We show that risks posed a threat to the identity of the project team, resulting in a discourse focused on attributing

  19. Structuring Effective Student Teams.

    Science.gov (United States)

    Dickson, Ellen L.

    1997-01-01

    Experience with student teams working on policy analysis projects indicates the need for faculty supervision of teams in the process of addressing complex issues. The problem-solving approach adopted in one policy analysis course is described, including assignments and tasks, issues and sponsors, team dynamics, conflict management, and the…

  20. Project T.E.A.M. (Technical Education Advancement Modules). Introduction to Statistical Process Control.

    Science.gov (United States)

    Billings, Paul H.

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 6-hour introductory module on statistical process control (SPC), designed to develop competencies in the following skill areas: (1) identification of the three classes of SPC use; (2) understanding a process and how it works; (3)…

  1. Brokerage by a Project Manager across a New Product Development Project

    DEFF Research Database (Denmark)

    Jepsen, Lisbeth Brøde; Jepsen, Anna Lund; Dietrich, Perttu

    2012-01-01

    between three subtypes of brokerage: Brokerage connecting actors from the project team with actors from the various departments within the same organization (intra-organizational brokerage), brokerage connecting employees at the NPD organization with someone working in another organization (inter...... as a hub between possible suppliers for the project. We had also expected that the PM would be more involved in coordination of, to and from the project team than what we found in this study. Based on the study, it seems that some of the connections that we, based on existing knowledge, would expect...... that the management of the project in terms of linking the stakeholders takes off in the solution development phase rather than in the concept development phase which is the phase in focus in large parts of the research that has taken place in this field. Further, contrary to expectations based on existing knowledge...

  2. Scrum Project Management

    CERN Document Server

    Pries, Kim H

    2010-01-01

    Scrum, which was originally invented solely for software development, can now be applied to all types of projects. This book shows project managers how to implement Scrum by explaining the artifacts, rituals, and roles used. The text provides Scrum planning methods to control project scope and schedule as well as Scrum tracking methods to focus teams on improving throughput and streamlining communications. The authors show how to combine traditional project methods with Scrum and how to adapt the familiar work breakdown structure to create Scrum backlogs and sprints. They also demonstrate how

  3. Characterization of unpaved road condition through the use of remote sensing project - phase II, deliverable 8-D: final report.

    Science.gov (United States)

    2016-03-07

    Building on the success of developing a UAV based unpaved road assessment system in Phase I, the project team was awarded a Phase II project by the USDOT to focus on outreach and implementation. The project team added Valerie Lefler of Integrated Glo...

  4. Balancing creativity and time efficiency in multi-team R&D projects : the alignment of formal and informal networks

    NARCIS (Netherlands)

    Kratzer, Jan; Gemuenden, Hans Georg; Lettl, Christopher

    2008-01-01

    The business world is denoted by an increasing number of multi-team research and development (R&D) projects, however, managerial knowledge about how to run them successfully is scarce. The present study attempts to shed light at this kind of projects by investigating the alignment of formal and

  5. Integrating Public Health and Health Promotion Practice in the Medical Curriculum: A Self-Directed Team-Based Project Approach

    Directory of Open Access Journals (Sweden)

    Geraldine Kershaw

    2017-08-01

    Full Text Available Preparing health professionals in health promotion (HP and disease prevention is essential for improvement of population health, community HP, and better health care for individuals. The aim of this article is to describe an HP project in the form of a major self-directed project-based learning task integrated within the curriculum in the second year of the medical degree program at United Arab Emirates University. The project introduces students to public health and HP practice and develops students’ literature searching, writing, presentation skills, and team work. Students learn the principles underlying behavioral change, and the design of HP programs and materials, through a lecture format. Small groups of students each choose a specific health topic for their project. Over 11 weeks, students obtain information about their topic from appropriate sources (library, PubMed, Google Scholar, credible health sources such as World Health Organization. Using the principles learned in the lectures, they develop appropriate materials for their target audience: for example, posters, a pamphlet, social media content, or a video or radio message. Students seek advice from specialist faculty as needed. In week 12, each team presents their project background, rationale, and materials to their colleagues in a seminar format open to all faculty. They then submit the materials they developed for assessment. Group marks are assigned for presentations and materials. Key concepts are assessed by multiple choice questions in comprehensive course examinations. By participation in the HP project, many students develop a solid background in prevention. The information retrieval, writing, and presentation skills, as well as experience of team work, are valuable both for the remaining years of their training and their future careers.

  6. Team Building: Proven Strategies for Improving Team Performance, 4th Edition”

    Directory of Open Access Journals (Sweden)

    Greg Homan

    2008-12-01

    Full Text Available Team Building is an important issue for Youth Development professionals. We utilize team-focused work to achieve our objectives in educating youth. The team building skills we integrate into programming serve to prepare youth for the dynamic, highly interpersonal work environment of today. “Team Building: Proven Strategies for Improving Team Performance, 4th Edition,” by W. Dyer, W.G. Dyer, and J. Dyer (2007, provides a practical theoretical framework for those interested in team building application, training, and practice in everyday work.

  7. When Teams Go Crazy

    DEFF Research Database (Denmark)

    Kuhrmann, Marco; Münch, Jürgen

    2016-01-01

    Software development consists to a large extend of human-based processes with continuously increasing demands regarding interdisciplinary team work. Understanding the dynamics of software teams can be seen as highly important to successful project execution. Hence, for future project managers......, knowledge about non-technical processes in teams is significant. In this paper, we present a course unit that provides an environment in which students can learn and experience the impact of group dynamics on project performance and quality. The course unit uses the Tuckman model as theoretical framework......, and borrows from controlled experiments to organize and implement its practical parts in which students then experience the effects of, e.g., time pressure, resource bottlenecks, staff turnover, loss of key personnel, and other stress factors. We provide a detailed design of the course unit to allow...

  8. Attributions by Team Members for Team Outcomes in Finnish Working Life

    OpenAIRE

    Valo, Maarit; Hurme, Pertti

    2010-01-01

    This study focuses on teamwork in Finnish working life. Through a wide cross-section of teams the study examines the causes to which team members attribute the outcomes of their teams. Qualitative data was collected from 314 respondents. They wrote 616 stories to describe memorable experiences of success and failure in teamwork. The stories revealed 1930 explanations. The findings indicate that both favorable and unfavorable team outcomes are perceived as being caused by ...

  9. Performance of Student Software Development Teams: The Influence of Personality and Identifying as Team Members

    Science.gov (United States)

    Monaghan, Conal; Bizumic, Boris; Reynolds, Katherine; Smithson, Michael; Johns-Boast, Lynette; van Rooy, Dirk

    2015-01-01

    One prominent approach in the exploration of the variations in project team performance has been to study two components of the aggregate personalities of the team members: conscientiousness and agreeableness. A second line of research, known as self-categorisation theory, argues that identifying as team members and the team's performance norms…

  10. Teaming up

    DEFF Research Database (Denmark)

    Warhuus, Jan; Günzel-Jensen, Franziska; Robinson, Sarah

    or pre-arranged at random. Therefore we investigate the importance of team formation in the entrepreneurial classroom and ask: (i) What are the underlying factors that influence outcomes of teamwork in student groups? (ii) How does team formation influence student perception of learning?, and (iii) Do...... different team formation strategies produce different teamwork and learning outcomes? Approach: We employed a multiple case study design comprising of 38 student teams to uncover potential links between team formation and student perception of learning. This research draws on data from three different....... A rigorous coding and inductive analysis process was undertaken. Pattern and relationship coding were used to reveal underlying factors, which helped to unveil important similarities and differences between student in different teams’ project progress and perception of learning. Results: When students...

  11. Toward Learning Teams

    DEFF Research Database (Denmark)

    Hoda, Rashina; Babb, Jeff; Nørbjerg, Jacob

    2013-01-01

    to sacrifice learning-focused practices. Effective learning under pressure involves conscious efforts to implement original agile practices such as retrospectives and adapted strategies such as learning spikes. Teams, their management, and customers must all recognize the importance of creating learning teams......Today's software development challenges require learning teams that can continuously apply new engineering and management practices, new and complex technical skills, cross-functional skills, and experiential lessons learned. The pressure of delivering working software often forces software teams...

  12. Implementation of a self-directed work team in a TLD Processing Center

    International Nuclear Information System (INIS)

    Arnwine, A.A.; Bogard, R.S.; Teasley, N.A.; Somers, D.E.; Souleyrette, M.L.

    1994-01-01

    In an effort to maintain productivity with a decreasing work force, the Oak Ridge Y-12 Plant has adopted the concept of Self-Directed Work Teams in various disciplines. The plant's Health Physics Department was able to eliminate a layer of front-line supervisors by establishing four self-directed work teams. Each team was able to choose their method of implementation. The TLD Processing Center Team chose to use project managment tools to ensure a smooth transition from the traditional work group to a self-directed approach. This process focused on establishing responsibilities, determining training requirements, determining a leadership style for the group, and performing a potential problem analysis for the transition. The transition also reviewed interface issues that could occur with upper management, matrix management, technical oversight, and organizational peers. The team's experience is also evaluated in comparison to other Self-Directed Work Teams

  13. Fulbright project focuses on rehabilitation technician education and ...

    African Journals Online (AJOL)

    Rehabilitation technician education and physiotherapy practice 272. Fulbright project focuses on ... particularly those qualified to mentor and teach entry-level learners, there are ... to reinforce classroom didactic knowledge as ongoing learning .... utilization of limited resources, and development of linkages with professional ...

  14. Using practice development methodology to develop children's centre teams: ideas for the future.

    Science.gov (United States)

    Hemingway, Ann; Cowdell, Fiona

    2009-09-01

    The Children's Centre Programme is a recent development in the UK and brings together multi-agency teams to work with disadvantaged families. Practice development methods enable teams to work together in new ways. Although the term practice development remains relatively poorly defined, its key properties suggest that it embraces engagement, empowerment, evaluation and evolution. This paper introduces the Children's Centre Programme and practice development methods and aims to discuss the relevance of using this method to develop teams in children's centres through considering the findings from an evaluation of a two-year project to develop inter-agency public health teams. The evaluation showed that practice development methods can enable successful team development and showed that through effective facilitation, teams can change their practice to focus on areas of local need. The team came up with their own process to develop a strategy for their locality.

  15. Virtual Team Governance: Addressing the Governance Mechanisms and Virtual Team Performance

    Science.gov (United States)

    Zhan, Yihong; Bai, Yu; Liu, Ziheng

    As technology has improved and collaborative software has been developed, virtual teams with geographically dispersed members spread across diverse physical locations have become increasingly prominent. Virtual team is supported by advancing communication technologies, which makes virtual teams able to largely transcend time and space. Virtual teams have changed the corporate landscape, which are more complex and dynamic than traditional teams since the members of virtual teams are spread on diverse geographical locations and their roles in the virtual team are different. Therefore, how to realize good governance of virtual team and arrive at good virtual team performance is becoming critical and challenging. Good virtual team governance is essential for a high-performance virtual team. This paper explores the performance and the governance mechanism of virtual team. It establishes a model to explain the relationship between the performance and the governance mechanisms in virtual teams. This paper is focusing on managing virtual teams. It aims to find the strategies to help business organizations to improve the performance of their virtual teams and arrive at the objectives of good virtual team management.

  16. Factors Contributing to Research Team Effectiveness: Testing a Model of Team Effectiveness in an Academic Setting

    Science.gov (United States)

    Omar, Zoharah; Ahmad, Aminah

    2014-01-01

    Following the classic systems model of inputs, processes, and outputs, this study examined the influence of three input factors, team climate, work overload, and team leadership, on research project team effectiveness as measured by publication productivity, team member satisfaction, and job frustration. This study also examined the mediating…

  17. Differences between early and late involvement of palliative home care in oncology care: A focus group study with palliative home care teams.

    Science.gov (United States)

    Dhollander, Naomi; Deliens, Luc; Van Belle, Simon; De Vleminck, Aline; Pardon, Koen

    2018-05-01

    To date, no randomised controlled trials on the integration of specialised palliative home care into oncology care have been identified. Information on whether existing models of integrated care are applicable to the home care system and how working procedures and skills of the palliative care teams might require adaptation is missing. To gain insight into differences between early and late involvement and the effect on existing working procedures and skills as perceived by palliative home care teams. Qualitative study - focus group interviews. Six palliative home care teams in Flanders, Belgium. Participants included physicians, nurses and psychologists. Differences were found concerning (1) reasons for initiation, (2) planning of care process, (3) focus on future goals versus problems, (4) opportunity to provide holistic care, (5) empowerment of patients and (6) empowerment of professional caregivers. A shift from a medical approach to a more holistic approach is the most noticeable. Being involved earlier also results in a more structured follow-up and in empowering the patient to be part of the decision-making process. Early involvement creates the need for transmural collaboration, which leads to the teams taking on more supporting and coordinating tasks. Being involved earlier leads to different tasks and working procedures and to the need for transmural collaboration. Future research might focus on the development of an intervention model for the early integration of palliative home care into oncology care. To develop this model, components of existing models might need to be adapted or extended.

  18. A conceptual model to improve performance in virtual teams

    Directory of Open Access Journals (Sweden)

    Shopee Dube

    2016-09-01

    Full Text Available Background: The vast improvement in communication technologies and sophisticated project management tools, methods and techniques has allowed geographically and culturally diverse groups to operate and function in a virtual environment. To succeed in this virtual environment where time and space are becoming increasingly irrelevant, organisations must define new ways of implementing initiatives. This virtual environment phenomenon has brought about the formation of virtual project teams that allow organisations to harness the skills and knowhow of the best resources, irrespective of their location. Objectives: The aim of this article was to investigate performance criteria and develop a conceptual model which can be applied to enhance the success of virtual project teams. There are no clear guidelines of the performance criteria in managing virtual project teams. Method: A qualitative research methodology was used in this article. The purpose of content analysis was to explore the literature to understand the concept of performance in virtual project teams and to summarise the findings of the literature reviewed. Results: The research identified a set of performance criteria for the virtual project teams as follows: leadership, trust, communication, team cooperation, reliability, motivation, comfort and social interaction. These were used to conceptualise the model. Conclusion: The conceptual model can be used in a holistic way to determine the overall performance of the virtual project team, but each factor can be analysed individually to determine the impact on the overall performance. The knowledge of performance criteria for virtual project teams could aid project managers in enhancing the success of these teams and taking a different approach to better manage and coordinate them.

  19. Incorporating Virtually Immersive Environments as a Collaborative Medium for Virtual Teaming

    Directory of Open Access Journals (Sweden)

    Charles J. Lesko, Jr.

    2012-08-01

    Full Text Available Virtually immersive environments incorporate the use of various computer modelling and simulation techniques enabling geographically dispersed virtual project teams to interact within an artificially projected three-dimensional space online. This study focused on adoption of virtually immersive technologies as a collaborative media to support virtual teaming of both graduate and undergraduate-level project management students. The data and information from this study has implications for educators using virtually immersive environments in the classroom. In this study, we specifically evaluated two key components in this paper: 1 students’ level of trust and; 2 students’ willingness to use the technology, along with their belief about the virtual environment’s ability to extend and improve knowledge sharing in their team work environment. We learned that while students did find the environment a positive add on for working collaboratively, there were students who were neither more nor less likely to use the technology for future collaborative ventures. Most of the students who were not very positive about the environment were “fence sitters” likely indicating needs related to additional training to improve communication skills. Finally, based on the full study results we have provided basic recommendations designed to support team trust building in the system along with interpersonal trust building to facilitate knowledge transfer and better strategic us of the technology.

  20. ´Island hopping`– doing ethnographic study following interprofessional teams of students across sectors and professions

    DEFF Research Database (Denmark)

    Nielsen, Cathrine Sand

    The ethnographic study focuses the profession-oriented learning-context, following the case InBetween. InBetween is a collaboration project aimed at strengthens patient-centred, interprofessional skills among health professional students. The ethnographic aim is to explore the project in practice...... focusing the process of individual, interprofessional and (inter)organizational learning. The framework is a mixture of ethnographic methods. In mapping out the field the challenges for the fieldwork are to follow the interprofessional teams of students in diverse settings: on hospital wards, at home...... with the patient, at the University College. Like island hopping the researcher almost jump from site to site, between islands of expertise and professions. The paper reflects the challenges following teams of students across the healthcare- and education sectors. Through examples from the ongoing fieldwork...

  1. Uncovering Transdisciplinary Team Project Outcomes through Ripple Effect Mapping

    Science.gov (United States)

    Daniels, Catherine H.; Chalker-Scott, Linda; Martini, Nicole

    2016-01-01

    The Garden Team at Washington State University is a transdisciplinary, geographically dispersed group of faculty and staff. As with many such teams, member retention requires effort, as busy individuals may not see the overall benefits of active team membership. Ripple effect mapping is a strategy that can illustrate the tangible and often…

  2. HBR guide to project management

    CERN Document Server

    Harvard Business Review

    2013-01-01

    MEET YOUR GOALS—ON TIME AND ON BUDGET. How do you rein in the scope of your project when you’ve got a group of demanding stakeholders breathing down your neck? And map out a schedule everyone can stick to? And motivate team members who have competing demands on their time and attention? Whether you’re managing your first project or just tired of improvising, this guide will give you the tools and confidence you need to define smart goals, meet them, and capture lessons learned so future projects go even more smoothly. The HBR Guide to Project Management will help you: • Build a strong, focused team • Break major objectives into manageable tasks • Create a schedule that keeps all the moving parts under control • Monitor progress toward your goals • Manage stakeholders’ expectations • Wrap up your project and gauge its success

  3. Energy Efficiency Performance in Refurbishment Projects with Design Team Attributes As A Mediator: A Pilot Study

    Science.gov (United States)

    Sekak, Siti Nor Azniza Ahmad; Rahmat Dr, Ismail, Prof.; Yunus, Julitta; Saád, Sri Rahayu Mohd; Hanafi Azman Ong, Mohd

    2017-12-01

    The Energy Efficiency (EE) plays an important role over the building life cycle and the implementation of EE in refurbishment projects has a significant potential towards the reduction of greenhouse gas emissions. However, the involvement of the design team at the early stage of the refurbishment projects will determine the success of EE implementations. Thus, a pilot study was conducted at the initial stage of the data collection process of this research to validate and verify the questionnaires.

  4. A Simplified Model of Human Alcohol Metabolism That Integrates Biotechnology and Human Health into a Mass Balance Team Project

    Science.gov (United States)

    Yang, Allen H. J.; Dimiduk, Kathryn; Daniel, Susan

    2011-01-01

    We present a simplified human alcohol metabolism model for a mass balance team project. Students explore aspects of engineering in biotechnology: designing/modeling biological systems, testing the design/model, evaluating new conditions, and exploring cutting-edge "lab-on-a-chip" research. This project highlights chemical engineering's impact on…

  5. Observing Engineering Student Teams from the Organization Behavior Perspective Using Linguistic Analysis of Student Reflections and Focus Group Interviews

    Science.gov (United States)

    Kearney, Kerri S.; Damron, Rebecca; Sohoni, Sohum

    2015-01-01

    This paper investigates group/team development in computer engineering courses at a University in the Central USA from the perspective of organization behavior theory, specifically Tuckman's model of the stages of group development. The investigation, conducted through linguistic analysis of student reflection essays, and through focus group…

  6. Leadership Team | Wind | NREL

    Science.gov (United States)

    Leadership Team Leadership Team Learn more about the expertise and technical skills of the wind Initiative and provides leadership in the focus areas of high-fidelity modeling, wind power plant controls

  7. Task versus relationship conflict, team performance, and team member satisfaction: a meta-analysis.

    Science.gov (United States)

    De Dreu, Carsten K W; Weingart, Laurie R

    2003-08-01

    This study provides a meta-analysis of research on the associations between relationship conflict, task conflict, team performance, and team member satisfaction. Consistent with past theorizing, results revealed strong and negative correlations between relationship conflict, team performance, and team member satisfaction. In contrast to what has been suggested in both academic research and introductory textbooks, however, results also revealed strong and negative (instead of the predicted positive) correlations between task conflict team performance, and team member satisfaction. As predicted, conflict had stronger negative relations with team performance in highly complex (decision making, project, mixed) than in less complex (production) tasks. Finally, task conflict was less negatively related to team performance when task conflict and relationship conflict were weakly, rather than strongly, correlated.

  8. Nuclear Nonproliferation Ontology Assessment Team Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Strasburg, Jana D.; Hohimer, Ryan E.

    2012-01-01

    Final Report for the NA22 Simulations, Algorithm and Modeling (SAM) Ontology Assessment Team's efforts from FY09-FY11. The Ontology Assessment Team began in May 2009 and concluded in September 2011. During this two-year time frame, the Ontology Assessment team had two objectives: (1) Assessing the utility of knowledge representation and semantic technologies for addressing nuclear nonproliferation challenges; and (2) Developing ontological support tools that would provide a framework for integrating across the Simulation, Algorithm and Modeling (SAM) program. The SAM Program was going through a large assessment and strategic planning effort during this time and as a result, the relative importance of these two objectives changed, altering the focus of the Ontology Assessment Team. In the end, the team conducted an assessment of the state of art, created an annotated bibliography, and developed a series of ontological support tools, demonstrations and presentations. A total of more than 35 individuals from 12 different research institutions participated in the Ontology Assessment Team. These included subject matter experts in several nuclear nonproliferation-related domains as well as experts in semantic technologies. Despite the diverse backgrounds and perspectives, the Ontology Assessment team functioned very well together and aspects could serve as a model for future inter-laboratory collaborations and working groups. While the team encountered several challenges and learned many lessons along the way, the Ontology Assessment effort was ultimately a success that led to several multi-lab research projects and opened up a new area of scientific exploration within the Office of Nuclear Nonproliferation and Verification.

  9. A review of software project testing

    Directory of Open Access Journals (Sweden)

    Jose Calvo-Manzano Villalón

    2016-03-01

    Full Text Available In this article a review of software projects based on a taxonomy project is established, allowing the development team or testing personnel to identify the tests to which the project must be subjected for validation. The taxonomy is focused on identifying software projects according to their technology. To establish the taxonomy, a development method comprised of 5 phases was applied. The developed taxonomy is comprised of 10 categories and 35 subcategories and was validated by a group of information technology (IT managers and professionals in the field of IT through the use of a survey. The results obtained from the survey are subjected to the Mann-Whitney U test, which indicates that the taxonomy is validated. The taxonomy can be implemented in development organizations with or without a testing team that provides a classification for technology projects.

  10. Agile project management managing for success

    CERN Document Server

    Crowder, James A

    2015-01-01

    Management and enables them to deal with the demands and complexities of modern, agile systems/software/hardware development teams. The book examines the project/program manager beyond the concepts of leadership and aims to connect to employees' sense of identity. The text examines human psychological concepts such as "locus of control," which will help the manager understand their team members' view and how best to manage their "world" contributions. The authors cover new management tools and philosophies for agile systems/software/hardware development teams, with a specific focus on how this

  11. Action-Centered Team Leadership Influences More than Performance

    DEFF Research Database (Denmark)

    Braun, Frank C.; Avital, Michel; Martz, Ben

    2012-01-01

    Purpose – Building on a social-technical approach to project management, the authors aim to examine the effect of action-centered leadership attributes on team member's learning, knowledge collaboration and job satisfaction during IT-related projects. Design/methodology/approach – Structural...... collaboration along with individual performance and job satisfaction, and ultimately project success. Research limitations/implications – The action-centered leadership practices construct, developed in this study, can be a good surrogate measure of what is required to be an effective leader in an IT project...... equation modeling was utilized to assess the work environment of team members as well as the leadership practices of their respective project team leaders. Data were collected with a survey questionnaire from 327 team members in a variety of organizations in 15 industry sectors including financial services...

  12. Visualizations as Projection Devices

    DEFF Research Database (Denmark)

    Harty, Chris; Holm Jacobsen, Peter; Tryggestad, Kjell

    The aim of this paper is to inquire into the role of project visualizations in shaping healthcare spaces and practices. The study draws upon an ethnographic field study from a large on-going hospital construction project in Denmark, and focuses on the early phases of on-boarding the design team...... into the project organization. During the on-boarding visualizations multiplies in form, content and purpose, ranging from paper and digitally based projections of clinical work spaces and practices for the future hospital building in use, to paper and digitally based projections of the cost budget and time...

  13. Focused and Corrective Feedback Versus Structured and Supported Debriefing in a Simulation-Based Cardiac Arrest Team Training: A Pilot Randomized Controlled Study.

    Science.gov (United States)

    Kim, Ji-Hoon; Kim, Young-Min; Park, Seong Heui; Ju, Eun A; Choi, Se Min; Hong, Tai Yong

    2017-06-01

    The aim of the study was to compare the educational impact of two postsimulation debriefing methods-focused and corrective feedback (FCF) versus Structured and Supported Debriefing (SSD)-on team dynamics in simulation-based cardiac arrest team training. This was a pilot randomized controlled study conducted at a simulation center. Fourth-year medical students were randomly assigned to the FCF or SSD group, with each team composed of six students and a confederate. Each team participated in two simulations and the assigned debriefing (FCF or SSD) sessions and then underwent a test simulation. Two trained raters blindly assessed all of the recorded simulations using checklists. The primary outcome was the improvement in team dynamics scores between baseline and test simulation. The secondary outcomes were improvements before and after training in team clinical performance scores, self-assessed comprehension of and confidence in cardiac arrest management and team dynamics, as well as evaluations of the postsimulation debriefing intervention. In total, 95 students participated [FCF (8 teams, n = 47) and SSD (8 teams, n = 48)]. The SSD team dynamics score during the test simulation was higher than at baseline [baseline: 74.5 (65.9-80.9), test: 85.0 (71.9-87.6), P = 0.035]. However, there were no differences in the improvement in the team dynamics or team clinical performance scores between the two groups (P = 0.328, respectively). There was no significant difference in improvement in team dynamics scores during the test simulation compared with baseline between the SSD and FCF groups in a simulation-based cardiac arrest team training in fourth-year Korean medical students.

  14. Formalization of Team Creation

    OpenAIRE

    Cerman, Tomáš

    2010-01-01

    This paper is divided to practical and theoretical part. Theoretical part defines essential background of personality and work psychology which are pillars for using the personality and roles typology in practical part. I also define conceptions such as group, team, procedures of making the team. Practical part is focused at making the repertoary grid which outlines proximity of team roles, anchored in the repertoary grids upon personal atributes basis and picked team positions.

  15. PROJECT MANAGER SKILLS, RISK MANAGEMENT TOOLS

    Directory of Open Access Journals (Sweden)

    Vladut Iacob

    2013-12-01

    Full Text Available Although the projects are different from each other there are many common things that contribute to their success. Looked overall, the success of a project is the result of a multitude of factors. This person is considered the "engine" of the project. The man who makes the action set for the achievement of project objectives to be brought to an end. The project manager must have the technical knowledge and economic diverse. He should be able to choose a team and lead. You must be tenacious, combative, to know how to communicate both within the team and beyond. In a word, the project manager must have an impressive stock of knowledge, skills and abilities and appreciate as Peter Drucker, to "exist for the organization. To be its servant. Any management who forget this will only cause damage to the organization. "This study will focus on highlighting the skills of the project manager and their role in managing difficult situations or risk.

  16. The human side of lean teams.

    Science.gov (United States)

    Wackerbarth, Sarah B; Strawser-Srinath, Jamie R; Conigliaro, Joseph C

    2015-05-01

    Organizations use lean principles to increase quality and decrease costs. Lean projects require an understanding of systems-wide processes and utilize interdisciplinary teams. Most lean tools are straightforward, and the biggest barrier to successful implementation is often development of the team aspect of the lean approach. The purpose of this article is to share challenges experienced by a lean team charged with improving a hospital discharge process. Reflection on the experience provides an opportunity to highlight lessons from The Team Handbook by Peter Scholtes and colleagues. To improve the likelihood that process improvement initiatives, including lean projects, will be successful, organizations should consider providing training in organizational change principles and team building. The authors' lean team learned these lessons the hard way. Despite the challenges, the team successfully implemented changes throughout the organization that have had a positive impact. Training to understand the psychology of change might have decreased the resistance faced in implementing these changes. © 2014 by the American College of Medical Quality.

  17. Staff Turnover in Assertive Community Treatment (Act) Teams: The Role of Team Climate.

    Science.gov (United States)

    Zhu, Xi; Wholey, Douglas R; Cain, Cindy; Natafgi, Nabil

    2017-03-01

    Staff turnover in Assertive Community Treatment (ACT) teams can result in interrupted services and diminished support for clients. This paper examines the effect of team climate, defined as team members' shared perceptions of their work environment, on turnover and individual outcomes that mediate the climate-turnover relationship. We focus on two climate dimensions: safety and quality climate and constructive conflict climate. Using survey data collected from 26 ACT teams, our analyses highlight the importance of safety and quality climate in reducing turnover, and job satisfaction as the main mediator linking team climate to turnover. The findings offer practical implications for team management.

  18. Improving motivation and engagement in core engineering courses with student teams

    Science.gov (United States)

    Trenshaw, Kathryn Faye

    Team-based projects are common in capstone engineering design courses and increasingly common in first-year engineering programs. Despite high enrollments and budget cutbacks affecting many programs, second- and third-year students can also benefit from team-based project experiences, which motivate them to succeed in engineering and prepare them for a globally competitive workforce. My dissertation research demonstrates that team design projects can be incorporated into the curricula of engineering departments, and these projects result in positive affective outcomes for students. Using ABET outcomes and Self Determination Theory (SDT) as the background for my studies, I investigated students' confidence, motivation, and sense of community after experiencing team design projects in two different engineering departments at a large public institution. In the first study, I used a sequential mixed methods approach with a primary quantitative phase followed by an explanatory qualitative phase to evaluate a chemical engineering program that integrated team design projects throughout the curriculum. The evaluation methods included a survey based on desired ABET outcomes for students and focus groups to expand on the quantitative results. Students reported increased confidence in their design, teamwork, and communication skills after completing the projects. In my second and third studies, I used qualitative interviews based on SDT to explore student motivation in an electrical and computer engineering course redesigned to support students' intrinsic motivation to learn. SDT states that intrinsic motivation to learn is supported by increasing students' sense of autonomy, competence, and relatedness in regard to their learning. Using both narrative inquiry and phenomenological methodologies, I analyzed data from interviews of students for mentions of autonomy, competence, and relatedness as well as course events that were critical in changing students' motivation

  19. Team Performance in Emergency Medicine (MedTeams), Draft 3, Instructor Guide

    National Research Council Canada - National Science Library

    1997-01-01

    .... Unlike traditional team development which focuses more on improving group dynamics and interpersonal relationships, this program focuses on a concrete set of understandings and behavioral skills applicable in the emergency care environment.

  20. The Advanced Interdisciplinary Research Laboratory: A Student Team Approach to the Fourth-Year Research Thesis Project Experience

    Science.gov (United States)

    Piunno, Paul A. E.; Boyd, Cleo; Barzda, Virginijus; Gradinaru, Claudiu C.; Krull, Ulrich J.; Stefanovic, Sasa; Stewart, Bryan

    2014-01-01

    The advanced interdisciplinary research laboratory (AIRLab) represents a novel, effective, and motivational course designed from the interdisciplinary research interests of chemistry, physics, biology, and education development faculty members as an alternative to the independent thesis project experience. Student teams are assembled to work…

  1. Team-Based Development of Medical Devices: An Engineering–Business Collaborative

    Science.gov (United States)

    Eberhardt, Alan W.; Johnson, Ophelia L.; Kirkland, William B.; Dobbs, Joel H.; Moradi, Lee G.

    2016-01-01

    There is a global shift in the teaching methodology of science and engineering toward multidisciplinary, team-based processes. To meet the demands of an evolving technical industry and lead the way in engineering education, innovative curricula are essential. This paper describes the development of multidisciplinary, team-based learning environments in undergraduate and graduate engineering curricula focused on medical device design. In these programs, students actively collaborate with clinicians, professional engineers, business professionals, and their peers to develop innovative solutions to real-world problems. In the undergraduate senior capstone courses, teams of biomedical engineering (BME) and business students have produced and delivered numerous functional prototypes to satisfied clients. Pursuit of commercialization of devices has led to intellectual property (IP) disclosures and patents. Assessments have indicated high levels of success in attainment of student learning outcomes and student satisfaction with their undergraduate design experience. To advance these projects toward commercialization and further promote innovative team-based learning, a Master of Engineering (MEng) in Design and Commercialization was recently launched. The MEng facilitates teams of graduate students in engineering, life sciences, and business who engage in innovation-commercialization (IC) projects and coursework that take innovative ideas through research and development (R&D) to create marketable devices. The activities are structured with students working together as a “virtual company,” with targeted outcomes of commercialization (license agreements and new start-ups), competitive job placement, and/or career advancement. PMID:26902869

  2. Team-Based Development of Medical Devices: An Engineering-Business Collaborative.

    Science.gov (United States)

    Eberhardt, Alan W; Johnson, Ophelia L; Kirkland, William B; Dobbs, Joel H; Moradi, Lee G

    2016-07-01

    There is a global shift in the teaching methodology of science and engineering toward multidisciplinary, team-based processes. To meet the demands of an evolving technical industry and lead the way in engineering education, innovative curricula are essential. This paper describes the development of multidisciplinary, team-based learning environments in undergraduate and graduate engineering curricula focused on medical device design. In these programs, students actively collaborate with clinicians, professional engineers, business professionals, and their peers to develop innovative solutions to real-world problems. In the undergraduate senior capstone courses, teams of biomedical engineering (BME) and business students have produced and delivered numerous functional prototypes to satisfied clients. Pursuit of commercialization of devices has led to intellectual property (IP) disclosures and patents. Assessments have indicated high levels of success in attainment of student learning outcomes and student satisfaction with their undergraduate design experience. To advance these projects toward commercialization and further promote innovative team-based learning, a Master of Engineering (MEng) in Design and Commercialization was recently launched. The MEng facilitates teams of graduate students in engineering, life sciences, and business who engage in innovation-commercialization (IC) projects and coursework that take innovative ideas through research and development (R&D) to create marketable devices. The activities are structured with students working together as a "virtual company," with targeted outcomes of commercialization (license agreements and new start-ups), competitive job placement, and/or career advancement.

  3. Inequity-aversion and relative kindness intention jointly determine the expenditure of effort in project teams.

    Directory of Open Access Journals (Sweden)

    Jiaojie Han

    Full Text Available The literature on team cooperation has neglected the effects of relative kindness intention on cooperation, which we measure by comparing the kindness intentions of an agent to her group members to the kindness shown by other members to this same agent. We argue that the agent's emotional reaction to material payoff inequity is not constant, but rather affected by her relative kindness intention. Then, we apply the model to team projects with multiple partners and investigate how inequity-aversion and relative kindness intention jointly influence team cooperation. We first consider the case of homogeneous agents, where their marginal productivity levels and technical capacities are the same, and then consider the case of heterogeneous agents, where their marginal productivity levels and technical capacities are not the same. Our results show that inequity-aversion has no effect on effort expenditure in the former case, but does affect it in the latter case. The consideration of relative kindness intention may impact the agents' optimal cooperative effort expenditure when their technical capacities are different. In addition, it is beneficial for team cooperation, and might not only reduce the negative impact but also enhance the positive impact of inequity-aversion on the agents' effort expenditures.

  4. Understanding the Effects of Team Cognition Associated with Complex Engineering Tasks: Dynamics of Shared Mental Models, Task-SMM, and Team-SMM

    Science.gov (United States)

    Lee, Miyoung; Johnson, Tristan E.

    2008-01-01

    This study investigates how shared mental models (SMMs) change over time in teams of students in a manufacturing engineering course. A complex ill-structured project was given to each team. The objective of the team project was to analyze, test, and propose ways to improve their given manufactured product. Shared mental models were measured in…

  5. Technology of focus detection for 193nm projection lithographic tool

    Science.gov (United States)

    Di, Chengliang; Yan, Wei; Hu, Song; Xu, Feng; Li, Jinglong

    2012-10-01

    With the shortening printing wavelength and increasing numerical aperture of lithographic tool, the depth of focus(DOF) sees a rapidly drop down trend, reach a scale of several hundred nanometers while the repeatable accuracy of focusing and leveling must be one-tenth of DOF, approximately several dozen nanometers. For this feature, this article first introduces several focusing technology, Obtained the advantages and disadvantages of various methods by comparing. Then get the accuracy of dual-grating focusing method through theoretical calculation. And the dual-grating focusing method based on photoelastic modulation is divided into coarse focusing and precise focusing method to analyze, establishing image processing model of coarse focusing and photoelastic modulation model of accurate focusing. Finally, focusing algorithm is simulated with MATLAB. In conclusion dual-grating focusing method shows high precision, high efficiency and non-contact measurement of the focal plane, meeting the demands of focusing in 193nm projection lithography.

  6. The Creation and Operation of Internal High Performance Modern Enterprises Team

    Institute of Scientific and Technical Information of China (English)

    Shengyu WANG

    2015-01-01

    The future of enterprises mainly depends on product research and development. For the modern enterprises, high performance project team is the most important means of R & D projects. According to the interviews and survey found of a plurality of enterprise project R & D team. the internal high performance team of modern business is good or bad, its key lies in whether the team managers for the team creation and management is in place, this is the most difficult place for the high performance team management system, especially the team leadership. Based on this, this paper discusses on the creation and management of high performance modern enterprise team, aiming to provide valuable reference for the enterprise team management.

  7. GASCAV: focus on performance to meet the deadline

    Energy Technology Data Exchange (ETDEWEB)

    D' Oliveira, Celso A.; Franca, Ardson Luiz de S. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-12-19

    Brazil's state-owned oil and gas giant PETROBRAS engineering team concluded the gas duct Cabiunas (RJ) - Vitoria (ES) (GASCAV), one of the Southeast - Northeast Gas Pipeline's (GASENE) lines, which will increase gas production and distribution along those regions, attending PETROBRAS' Gas Production Anticipation Plan (PLANGAS) and federal government's growth acceleration plan (PAC). GASCAV has 300 kilometers in length, measures 28-inches in diameter and the capacity for a flow of 20 million cubic meters a day with maximum pressure of 100 kgf per square centimeter, 3 (three) points of supply capacity about 500 thousand cubic meters of natural gas per day and an optic fiber-system all along its extension. In order to build GASCAV gas-duct, the engineering team faced many hard circumstances, such as flood, went through mountains and 54 streams, had to provide 563 rock blasting, passed over 14 municipalities in both states of the project and crowded areas whose support was essential for the undertaking success. Besides, the team fulfilled an EPC-contract with a state-owned Chinese company, surmounting cultural and linguistic difficulties. Despite all challenging aspects, PETROBRAS has built the pipeline in one year and seven months, focused on the working management to accomplish it as scheduled, keeping the corporative indices goals by using a tool called 'project integrated analysis', with the purpose of building GASCAV on time. Due to the project's great amount of activities, a non-scheduled-attach follow up system was created in order to focus on those critical activities that have not started yet, and also considered the interaction between both internal and external interested parts of it, which allowed to predict and check out in a better way all information and situations that could have had interfered in the project's progress. The integrated analysis allowed this kind of control by considering the following data

  8. Interactive Team Cognition

    Science.gov (United States)

    Cooke, Nancy J.; Gorman, Jamie C.; Myers, Christopher W.; Duran, Jasmine L.

    2013-01-01

    Cognition in work teams has been predominantly understood and explained in terms of shared cognition with a focus on the similarity of static knowledge structures across individual team members. Inspired by the current zeitgeist in cognitive science, as well as by empirical data and pragmatic concerns, we offer an alternative theory of team…

  9. Complex Problem Solving in Teams: The Impact of Collective Orientation on Team Process Demands.

    Science.gov (United States)

    Hagemann, Vera; Kluge, Annette

    2017-01-01

    Complex problem solving is challenging and a high-level cognitive process for individuals. When analyzing complex problem solving in teams, an additional, new dimension has to be considered, as teamwork processes increase the requirements already put on individual team members. After introducing an idealized teamwork process model, that complex problem solving teams pass through, and integrating the relevant teamwork skills for interdependently working teams into the model and combining it with the four kinds of team processes (transition, action, interpersonal, and learning processes), the paper demonstrates the importance of fulfilling team process demands for successful complex problem solving within teams. Therefore, results from a controlled team study within complex situations are presented. The study focused on factors that influence action processes, like coordination, such as emergent states like collective orientation, cohesion, and trust and that dynamically enable effective teamwork in complex situations. Before conducting the experiments, participants were divided by median split into two-person teams with either high ( n = 58) or low ( n = 58) collective orientation values. The study was conducted with the microworld C3Fire, simulating dynamic decision making, and acting in complex situations within a teamwork context. The microworld includes interdependent tasks such as extinguishing forest fires or protecting houses. Two firefighting scenarios had been developed, which takes a maximum of 15 min each. All teams worked on these two scenarios. Coordination within the team and the resulting team performance were calculated based on a log-file analysis. The results show that no relationships between trust and action processes and team performance exist. Likewise, no relationships were found for cohesion. Only collective orientation of team members positively influences team performance in complex environments mediated by action processes such as

  10. S-TEAMS: A Truly Multiprofessional Course Focusing on Nontechnical Skills to Improve Patient Safety in the Operating Theater.

    Science.gov (United States)

    Stewart-Parker, Emma; Galloway, Robert; Vig, Stella

    Possessing adequate nontechnical skills (NTS) in operating theaters is of increasing interest to health care professionals, yet these are rarely formally taught. Teams make human errors despite technical expertise and knowledge, compromising patient safety. We designed a 1-day, multiprofessional, multidisciplinary course to teach, practice, and apply these skills through simulation. The course, "S-TEAMS," comprised a morning of lectures, case studies, and interactive teamworking exercises. The afternoon divided the group into multiprofessional teams to rotate around simulated scenarios. During the scenarios, teams were encouraged to focus on NTS, including communication strategies, situational awareness, and prompts such as checklists. A thorough debrief with experienced clinician observers followed. Data was collected through self-assessments, immediate and 6-month feedback to assess whether skills continued to be used and their effect on safety. In total, 68 health care professionals have completed the course thus far. All participants felt the course had a clear structure and that learning objectives were explicit. Overall, 95% felt the scenarios had good or excellent relevance to clinical practice. Self-assessments revealed a 55% increase in confidence for "speaking up" in difficult situations. Long-term data revealed 97% of the participants continued to use the skills, with 88% feeling the course had prevented them from making errors. Moreover, 94% felt the course had directly improved patient safety. There is a real demand and enthusiasm for developing NTS within the modern theater team. The simple and easily reproducible format of S-TEAMS is sustainable and inclusive, and crucially, the skills taught continue to be used in long term to improve patient safety and teamworking. Copyright © 2016 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  11. Continuous outreach activities performed by a student project team of undergraduates and their program topics in optics and photonics

    Science.gov (United States)

    Hasegawa, Makoto; Tokumitsu, Seika

    2016-09-01

    The out-of-curriculum project team "Rika-Kobo", organized by undergraduate students, has been actively engaged in a variety of continuous outreach activities in the fields of science and technology including optics and photonics. The targets of their activities cover wide ranges of generations from kids to parents and elderly people, with aiming to promote their interests in various fields of science and technologies. This is an out-of-curriculum project team with about 30 to 40 undergraduate students in several grades and majors. The total number of their activities per year tends to reach 80 to 90 in recent years. Typical activities to be performed by the project team include science classes in elementary and/or secondary schools, science classes at other educational facilities such as science museums, and experiment demonstrations at science events. Popular topics cover wide ranges from explanations and demonstrations of nature phenomena, such as rainbow colors, blue sky, sunset color, to demonstration experiments related to engineering applications, such as polarization of light, LEDs, and optical communications. Experimental topics in optics and photonics are especially popular to the audiences. Those activities are very effective to enhance interests of the audiences in learning related knowledges, irrespective of their generations. Those activities are also helpful for the student members to achieve and/or renew scientific knowledges. In addition, each of the activities provides the student members with effective and advantageous Project-Based-Learning (PBL) style experiences including manufacturing experiences, which are advantageous to cultivate their engineering skills.

  12. Hamline/3M Project: Liaison for Curricular Change

    Science.gov (United States)

    Rundquist, Andy

    2002-03-01

    This project was designed to catalyze curricular changes to better prepare students for the workplace. Industrial managers provided a list of 16 characteristics valued in the workplace: most were NOT related to science course content. The project formed 5 teams each including 3M professionals and students. Each team developed curricular changes in one of the 16 areas. Team goals were to improve skills in communication, data analysis, business/economics, team problem solving, and culture competency. Curricular changes realized include communication skill activities embodied in science courses and faculty communication teaching skill seminars, self learning tools in data analysis, statistics and model building, a new course developed with assistance from 3M personnel focussing on topics directly related to technological industries, high performance team problem solving training/coaching for faculty and workshops for students and faculty relative to importance of cultural competencies in the workplace, and a new course focusing on culture, team problem solving and conflict resolution in the technical workplace. Process for developing and content of curricular changes will be reported.

  13. Leadership Team | Water Power | NREL

    Science.gov (United States)

    Leadership Team Leadership Team Learn more about the expertise and technical skills of the water Initiative and provides leadership in the focus areas of high-fidelity modeling, wind power plant controls

  14. A Measure of Team Resilience: Developing the Resilience at Work Team Scale.

    Science.gov (United States)

    McEwen, Kathryn; Boyd, Carolyn M

    2018-03-01

    This study develops, and initial evaluates, a new measure of team-based resilience for use in research and practice. We conducted preliminary analyses, based on a cross-sectional sample of 344 employees nested within 31 teams. Seven dimensions were identified through exploratory and confirmatory factor analyses. The measure had high reliability and significant discrimination to indicate the presence of a unique team-based aspect of resilience that contributed to higher work engagement and higher self-rated team performance, over and above the effects of individual resilience. Multilevel analyses showed that team, but not individual, resilience predicted self-rated team performance. Practice implications include a need to focus on collective as well as individual behaviors in resilience-building. The measure provides a diagnostic instrument for teams and a scale to evaluate organizational interventions and research the relationship of resilience to other constructs.

  15. Recent Experiences of the NASA Engineering and Safety Center (NESC) GN and C Technical Discipline Team (TDT)

    Science.gov (United States)

    Dennehy, Cornelius J.

    2010-01-01

    The NASA Engineering and Safety Center (NESC), initially formed in 2003, is an independently funded NASA Program whose dedicated team of technical experts provides objective engineering and safety assessments of critical, high risk projects. The GN&C Technical Discipline Team (TDT) is one of fifteen such discipline-focused teams within the NESC organization. The TDT membership is composed of GN&C specialists from across NASA and its partner organizations in other government agencies, industry, national laboratories, and universities. This paper will briefly define the vision, mission, and purpose of the NESC organization. The role of the GN&C TDT will then be described in detail along with an overview of how this team operates and engages in its objective engineering and safety assessments of critical NASA projects. This paper will then describe selected recent experiences, over the period 2007 to present, of the GN&C TDT in which they directly performed or supported a wide variety of NESC assessments and consultations.

  16. A project management focused framework for assuring quality work processes

    Energy Technology Data Exchange (ETDEWEB)

    Gamsby, S.O.; Mize, J.D. [Allied Signal, Inc., Albuquerque, NM (United States). Federal Mfg. and Technologies; Reid, R.A. [New Mexico Univ., Albuquerque, NM (United States)

    1996-10-01

    Federal Manufacturing & Technologies/New Mexico (FM&T/NM) of AlliedSignal is an organization of approximately 300 associates providing operations support, engineering, and other technical services for DOE, New Mexico`s National Laboratories, etc. Work performed is primarily project-oriented and ranges from executing a major long-term contract for retrofitting and maintaining a large fleet of escort vehicles to creating a single, small, prototype electronic device for measuring radiation in a unique environment. FM&T/NM is functionally organized and operates in a classic matrix format with functional departments providing personnel with technical expertise, necessary physical resources, and administrative support to several project-based groups. Like most matrix-based organizations that provide support to diverse customers, FM&T/NM has encountered problems that occur when a group of project managers is expected to work together in using and scheduling a shared set of limited resources for the good of the organization as a whole. The framework for managing projects that we present focuses on developing, understanding, and managing the relationships between the functional organization structure, the system of work processes, and the management of projects. FM&T/NM retains its functional structure which primarily assigns personnel to work processes. The evolving role of the process leader focuses primarily on designing, managing, and improving the process, and the interactions among the subprocesses. The project manager is responsible for (1) translating customer requirements into product specifications, (2) determining the sequence of activities needed to meet project goals, (3) scheduling the required work processes, (4) monitoring project progress, (5) providing liaison between the customer and process leaders, and (6) having the desired product and/or service delivered to a satisfied customer in a timely manner.

  17. Scientific Retreats with ‘Speed Dating’: Networking to Stimulate New Interdisciplinary Translational Research Collaborations and Team Science

    Science.gov (United States)

    Alberg, Anthony J.; Brady, Kathleen T.; Obeid, Jihad S.; Davis, Randal; Halushka, Perry V.

    2016-01-01

    To stimulate the formation of new interdisciplinary translational research teams and innovative pilot projects, the South Carolina Clinical & Translational Research (SCTR) Institute (South Carolina Clinical and Translational Science Award, CTSA) initiated biannual scientific retreats with “speed dating” networking sessions. Retreat themes were prioritized based on the following criteria; cross-cutting topic, unmet medical need, generation of novel technologies and methodologies. Each retreat commences with an external keynote speaker followed by a series of brief research presentations by local researchers focused on the retreat theme, articulating potential areas for new collaborations. After each session of presentations, there is a 30 minute scientific “speed dating” period during which the presenters meet with interested attendees to exchange ideas and discuss collaborations. Retreat attendees are eligible to compete for pilot project funds on the topic of the retreat theme. The 10 retreats held have had a total of 1004 participants, resulted in 61 pilot projects with new interdisciplinary teams, and 14 funded projects. The retreat format has been a successful mechanism to stimulate novel interdisciplinary research teams and innovative translational research projects. Future retreats will continue to target topics of cross-cutting importance to biomedical and public health research. PMID:27807146

  18. Enhanced Training for Cyber Situational Awareness in Red versus Blue Team Exercises

    Energy Technology Data Exchange (ETDEWEB)

    Carbajal, Armida J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Human Factors and Statistics; Stevens-Adams, Susan Marie [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Risk and Reliability Analysis; Silva, Austin Ray [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Cognitive Modeling; Nauer, Kevin S. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Cyber Security Technologies; Anderson, Benjamin Robert [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Assurance Technologies and Assessment; Forsythe, James Chris [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Cognitive Modeling

    2012-09-01

    This report summarizes research conducted through the Sandia National Laboratories Enhanced Training for Cyber Situational Awareness in Red Versus Blue Team Exercises Laboratory Directed Research and Development project. The objective of this project was to advance scientific understanding concerning how to best structure training for cyber defenders. Two modes of training were considered. The baseline training condition (Tool-Based training) was based on current practices where classroom instruction focuses on the functions of a software tool with various exercises in which students apply those functions. In the second training condition (Narrative-Based training), classroom instruction addressed software functions, but in the context of adversary tactics and techniques. It was hypothesized that students receiving narrative-based training would gain a deeper conceptual understanding of the software tools and this would be reflected in better performance within a red versus blue team exercise.

  19. It's what you do and the way that you do it : team task, team size and innovation-relation group processes

    NARCIS (Netherlands)

    Curral, L.A.; Forrester, R.H.; Dawson, J.F.; West, M.A.

    2001-01-01

    This article describes a study of the relationships between team inputs (task type and team size) and team processes in 87 cross industry Portuguese teams, some of which had high and some low requirements to innovate. Team processes were measured using the Team Climate Inventory (TCI), which focuses

  20. Resilient behaviour in innovation teams for better project results

    NARCIS (Netherlands)

    Oeij, P.R.A.

    2017-01-01

    Extenden abstract. Organising in a mindful way is a central aspect to making innovation teams become more resilient and enahnce their chances of innovation success. Such organising, called mindful infrastructure, implies creating the right conditions for teams to excel. Four elements are crucial to

  1. CO-OP JIGSAW TEAM PROJECTS: A COOPERATIVE TEACHING METHOD TO IMPROVE STUDENTS‘ SPEAKING SKILL (An Experimental Study in a Senior High School

    Directory of Open Access Journals (Sweden)

    Diaz Innova Citra Arum

    2017-12-01

    Full Text Available An effective speaking activity involves active students to participate and create a life communication. The ideal condition of English speaking class involves the students‘ effectiveness in participating teaching and learning process. Nevertheless, some problems are emerged and one of them is that they often get nervous to speak in front of many people when they are asked to present their work to their friends. This paper reveals an experiment study in teaching speaking in a senior high school in Lamongan, East Java. It discusses about the effectiveness of cooperative teaching method known as coop jigsaw team projects in teaching speaking. All tenth grade students were used as the population and eighty students were taken as sample being divided into experimental group taught using coop jigsaw team projects and control group taught using direct instruction. Cluster random sampling was applied as the technique to determine sample. To obtain the data of students‘ speaking score, a speaking test was conducted. The score was the average score resulted by two independent examiners. The data were analysed through descriptive and inferential analysis using two-sample t-test. The research hypothesised that coop jigsaw will result a better English speaking score rather than direct instruction method. The research finding using 95% significance level shows that coop jigsaw team projects was more effective in teaching speaking compared to direct instruction for the tenth grade students because the activities in coop jigsaw team project pushed the students to be more active and cooperative in learning speaking.

  2. Complex Problem Solving in Teams: The Impact of Collective Orientation on Team Process Demands

    Science.gov (United States)

    Hagemann, Vera; Kluge, Annette

    2017-01-01

    Complex problem solving is challenging and a high-level cognitive process for individuals. When analyzing complex problem solving in teams, an additional, new dimension has to be considered, as teamwork processes increase the requirements already put on individual team members. After introducing an idealized teamwork process model, that complex problem solving teams pass through, and integrating the relevant teamwork skills for interdependently working teams into the model and combining it with the four kinds of team processes (transition, action, interpersonal, and learning processes), the paper demonstrates the importance of fulfilling team process demands for successful complex problem solving within teams. Therefore, results from a controlled team study within complex situations are presented. The study focused on factors that influence action processes, like coordination, such as emergent states like collective orientation, cohesion, and trust and that dynamically enable effective teamwork in complex situations. Before conducting the experiments, participants were divided by median split into two-person teams with either high (n = 58) or low (n = 58) collective orientation values. The study was conducted with the microworld C3Fire, simulating dynamic decision making, and acting in complex situations within a teamwork context. The microworld includes interdependent tasks such as extinguishing forest fires or protecting houses. Two firefighting scenarios had been developed, which takes a maximum of 15 min each. All teams worked on these two scenarios. Coordination within the team and the resulting team performance were calculated based on a log-file analysis. The results show that no relationships between trust and action processes and team performance exist. Likewise, no relationships were found for cohesion. Only collective orientation of team members positively influences team performance in complex environments mediated by action processes such as

  3. Complex Problem Solving in Teams: The Impact of Collective Orientation on Team Process Demands

    Directory of Open Access Journals (Sweden)

    Vera Hagemann

    2017-09-01

    Full Text Available Complex problem solving is challenging and a high-level cognitive process for individuals. When analyzing complex problem solving in teams, an additional, new dimension has to be considered, as teamwork processes increase the requirements already put on individual team members. After introducing an idealized teamwork process model, that complex problem solving teams pass through, and integrating the relevant teamwork skills for interdependently working teams into the model and combining it with the four kinds of team processes (transition, action, interpersonal, and learning processes, the paper demonstrates the importance of fulfilling team process demands for successful complex problem solving within teams. Therefore, results from a controlled team study within complex situations are presented. The study focused on factors that influence action processes, like coordination, such as emergent states like collective orientation, cohesion, and trust and that dynamically enable effective teamwork in complex situations. Before conducting the experiments, participants were divided by median split into two-person teams with either high (n = 58 or low (n = 58 collective orientation values. The study was conducted with the microworld C3Fire, simulating dynamic decision making, and acting in complex situations within a teamwork context. The microworld includes interdependent tasks such as extinguishing forest fires or protecting houses. Two firefighting scenarios had been developed, which takes a maximum of 15 min each. All teams worked on these two scenarios. Coordination within the team and the resulting team performance were calculated based on a log-file analysis. The results show that no relationships between trust and action processes and team performance exist. Likewise, no relationships were found for cohesion. Only collective orientation of team members positively influences team performance in complex environments mediated by action processes

  4. A pleasure working together? : the effects of dissimilarity in team member conscientiousness on team temporal processes and individual satisfaction

    NARCIS (Netherlands)

    Gevers, J.M.P.; Peeters, M.A.G.

    2009-01-01

    In this study of 43 student project teams, we tested a multi-level mediation model of the relationship between dissimilarity in conscientiousness, team temporal processes, and team member satisfaction. We distinguished between individual-level dissimilarity in conscientiousness (i.e., the distance

  5. Biomedical engineering education through global engineering teams.

    Science.gov (United States)

    Scheffer, C; Blanckenberg, M; Garth-Davis, B; Eisenberg, M

    2012-01-01

    Most industrial projects require a team of engineers from a variety of disciplines. The team members are often culturally diverse and geographically dispersed. Many students do not acquire sufficient skills from typical university courses to function efficiently in such an environment. The Global Engineering Teams (GET) programme was designed to prepare students such a scenario in industry. This paper discusses five biomedical engineering themed projects completed by GET students. The benefits and success of the programme in educating students in the field of biomedical engineering are discussed.

  6. Distributed and grid computing projects with research focus in human health.

    Science.gov (United States)

    Diomidous, Marianna; Zikos, Dimitrios

    2012-01-01

    Distributed systems and grid computing systems are used to connect several computers to obtain a higher level of performance, in order to solve a problem. During the last decade, projects use the World Wide Web to aggregate individuals' CPU power for research purposes. This paper presents the existing active large scale distributed and grid computing projects with research focus in human health. There have been found and presented 11 active projects with more than 2000 Processing Units (PUs) each. The research focus for most of them is molecular biology and, specifically on understanding or predicting protein structure through simulation, comparing proteins, genomic analysis for disease provoking genes and drug design. Though not in all cases explicitly stated, common target diseases include research to find cure against HIV, dengue, Duchene dystrophy, Parkinson's disease, various types of cancer and influenza. Other diseases include malaria, anthrax, Alzheimer's disease. The need for national initiatives and European Collaboration for larger scale projects is stressed, to raise the awareness of citizens to participate in order to create a culture of internet volunteering altruism.

  7. Planning and Managing Drupal Projects

    CERN Document Server

    Nordin, Dani

    2011-01-01

    If you're a solo website designer or part of a small team itching to build interesting projects with Drupal, this concise guide will get you started. Drupal's learning curve has thrown off many experienced designers, particularly the way it handles design challenges. This book shows you the lifecycle of a typical Drupal project, with emphasis on the early stages of site planning. Learn how to efficiently estimate and set up your own project, so you can focus on ways to make your vision a reality, rather than let project management details constantly distract you. Plan and estimate your projec

  8. Explaining variation in perceived team effectiveness: results from eleven quality improvement collaboratives.

    Science.gov (United States)

    Strating, Mathilde M H; Nieboer, Anna P

    2013-06-01

    Explore effectiveness of 11 collaboratives focusing on 11 different topics, as perceived by local improvement teams and to explore associations with collaborative-, organisational- and team-level factors. Evidence underlying the effectiveness of quality improvement collaboratives is inconclusive and few studies investigated determinants of implementation success. Moreover, most evaluation studies on quality improvement collaboratives are based on one specific topic or quality problem, making it hard to compare across collaboratives addressing different topics. A multiple-case cross-sectional study. Quality improvement teams in 11 quality improvement collaboratives focusing on 11 different topics. Team members received a postal questionnaire at the end of each collaborative. Of the 283 improvement teams, 151 project leaders and 362 team members returned the questionnaire. Analysis of variance revealed that teams varied widely on perceived effectiveness. Especially, members in the Prevention of Malnutrition and Prevention of Medication Errors collaboratives perceived a higher effectiveness than other groups. Multilevel regression analyses showed that educational level of professionals, innovation attributes, organisational support, innovative culture and commitment to change were all significant predictors of perceived effectiveness. In total, 27·9% of the individual-level variance, 57·6% of the team-level variance and 80% of the collaborative-level variance could be explained. The innovation's attributes, organisational support, an innovative team culture and professionals' commitment to change are instrumental to perceived effectiveness. The results support the notion that a layered approach is necessary to achieve improvements in quality of care and provides further insight in the determinants of success of quality improvement collaboratives. Understanding which factors enhance the impact of quality improvement initiatives can help professionals to achieve

  9. NASA technology applications team: Applications of aerospace technology

    Science.gov (United States)

    1993-01-01

    This report covers the activities of the Research Triangle Institute (RTI) Technology Applications Team for the period 1 October 1992 through 30 September 1993. The work reported herein was supported by the National Aeronautics and Space Administration (NASA), Contract No. NASW-4367. Highlights of the RTI Applications Team activities over the past year are presented in Section 1.0. The Team's progress in fulfilling the requirements of the contract is summarized in Section 2.0. In addition to our market-driven approach to applications project development, RTI has placed increased effort on activities to commercialize technologies developed at NASA Centers. These Technology Commercialization efforts are summarized in Section 3.0. New problem statements prepared by the Team in the reporting period are presented in Section 4.0. The Team's transfer activities for ongoing projects with the NASA Centers are presented in Section 5.0. Section 6.0 summarizes the status of four add-on tasks. Travel for the reporting period is described in Section 7.0. The RTI Team staff and consultants and their project responsibilities are listed in Appendix A. Appendix B includes Technology Opportunity Announcements and Spinoff! Sheets prepared by the Team while Appendix C contains a series of technology transfer articles prepared by the Team.

  10. Scientific retreats with 'speed dating': networking to stimulate new interdisciplinary translational research collaborations and team science.

    Science.gov (United States)

    Ranwala, Damayanthi; Alberg, Anthony J; Brady, Kathleen T; Obeid, Jihad S; Davis, Randal; Halushka, Perry V

    2017-02-01

    To stimulate the formation of new interdisciplinary translational research teams and innovative pilot projects, the South Carolina Clinical and Translational Research (SCTR) Institute (South Carolina Clinical and Translational Science Award, CTSA) initiated biannual scientific retreats with 'speed dating' networking sessions. Retreat themes were prioritized based on the following criteria; cross-cutting topic, unmet medical need, generation of novel technologies and methodologies. Each retreat begins with an external keynote speaker followed by a series of brief research presentations by local researchers focused on the retreat theme, articulating potential areas for new collaborations. After each session of presentations, there is a 30 min scientific 'speed dating' period during which the presenters meet with interested attendees to exchange ideas and discuss collaborations. Retreat attendees are eligible to compete for pilot project funds on the topic of the retreat theme. The 10 retreats held have had a total of 1004 participants, resulted in 61 pilot projects with new interdisciplinary teams, and 14 funded projects. The retreat format has been a successful mechanism to stimulate novel interdisciplinary research teams and innovative translational research projects. Future retreats will continue to target topics of cross-cutting importance to biomedical and public health research. Copyright © 2016 American Federation for Medical Research.

  11. Focus on energy conservation: a project list

    Energy Technology Data Exchange (ETDEWEB)

    1978-04-01

    The Urban Land Institute (ULI) has prepared the following list of outstanding energy conserving projects for the US Department of Energy. As requested by the Department, the list includes descriptions of land developments and individual buildings suggested by members of ULI and by other sources. The projects have been selected to exemplify the major energy saving techniques in use today, with emphasis on those strategies most significant for people engaged in the business of land development. To make the list a useful reference for developers and public officials, ULI has attempted to cover energy conservation in the broadest sense from overall site planning to the functioning of individual building components. Focusing too closely on the myriad types of hardware available has been avoided and examples of the basic considerations important to energy-conscious planning and design are provided. Details on some heating, ventilation and air conditioning systems are provided in order to acquaint readers with major innovations in the field.

  12. Extra-team connections for knowledge transfer between staff teams

    Science.gov (United States)

    Ramanadhan, Shoba; Wiecha, Jean L.; Emmons, Karen M.; Gortmaker, Steven L.; Viswanath, Kasisomayajula

    2009-01-01

    As organizations implement novel health promotion programs across multiple sites, they face great challenges related to knowledge management. Staff social networks may be a useful medium for transferring program-related knowledge in multi-site implementation efforts. To study this potential, we focused on the role of extra-team connections (ties between staff members based in different site teams) as potential channels for knowledge sharing. Data come from a cross-sectional study of afterschool childcare staff implementing a health promotion program at 20 urban sites of the Young Men's Christian Association of Greater Boston. We conducted a sociometric social network analysis and attempted a census of 91 program staff members. We surveyed 80 individuals, and included 73 coordinators and general staff, who lead and support implementation, respectively, in this study. A multiple linear regression model demonstrated a positive relationship between extra-team connections (β = 3.41, P knowledge transfer. We also found that intra-team connections (within-team ties between staff members) were also positively related to skill receipt. Connections between teams appear to support knowledge transfer in this network, but likely require greater active facilitation, perhaps via organizational changes. Further research on extra-team connections and knowledge transfer in low-resource, high turnover environments is needed. PMID:19528313

  13. Soft Assembling Project-Based Learning and Leadership in Japan

    Science.gov (United States)

    Knight, Kevin; Murphey, Tim

    2017-01-01

    In this article, we initially focus on how the conceptualization of leadership by Knight (2013a) in his leadership seminars became the basis for choosing a project-based learning (PBL) approach. We then consider how soft assembling can enhance the leadership project activities of student teams and group-work in general classes. Soft assembling…

  14. Project-Based Laboratory Experiences in Mechanical Engineering

    Directory of Open Access Journals (Sweden)

    Narendra Sharma

    2011-12-01

    Full Text Available In this paper we describe project-based laboratories in Mechanical Engineering designed to provide semester-long team experiences which mimic the real life industrial processes of design, development, testing and optimization. The labs are focused on courses at the sophomore level and thus require special attention to constraints of student backgrounds and experience. This paper describes laboratory projects in Dynamics and Fluid Mechanics.

  15. SELECTING WORKING TEAMS FOR INFORMATION TECHNOLOGY OUTSOURCING PROJECTS THROUGH A COMBINATION OF METHODOLOGIES

    Directory of Open Access Journals (Sweden)

    María Alejandra Castellini

    Full Text Available ABSTRACT This paper deals with a problem that Information Technology outsourcing suppliers generally face when selecting a working team technically capable for specific roles in software development projects. A combination of methodologies, interactively integrated, is proposed. They are Soft System Methodology to structure the problem, Repertory Grid for individual interviews and elicitation of the selection criteria, DRV Processes to assess the candidates and to generate knowledge and consensus on the selection process and Linear Programming to assign people to each position. This multimethodology allowed finding a more comprehensive solution than that initially requested by the company, since it helped to establish the necessary transformations for the selection model to operate in the right way, set the competencies to be considered as selection criteria, develop a consensus estimate of the weighted criteria, and award global values to candidates, optimizing the assignment of roles in the group for the project.

  16. Leading team learning: what makes interprofessional teams learn to work well?

    Science.gov (United States)

    Chatalalsingh, Carole; Reeves, Scott

    2014-11-01

    This article describes an ethnographic study focused on exploring leaders of team learning in well-established nephrology teams in an academic healthcare organization in Canada. Employing situational theory of leadership, the article provides details on how well established team members advance as "learning leaders". Data were gathered by ethnographic methods over a 9-month period with the members of two nephrology teams. These learning to care for the sick teams involved over 30 regulated health professionals, such as physicians, nurses, social workers, pharmacists, dietitians and other healthcare practitioners, staff, students and trainees, all of whom were collectively managing obstacles and coordinating efforts. Analysis involved an inductive thematic analysis of observations, reflections, and interview transcripts. The study indicated how well established members progress as team-learning leaders, and how they adapt to an interprofessional culture through the activities they employ to enable day-to-day learning. The article uses situational theory of leadership to generate a detailed illumination of the nature of leaders' interactions within an interprofessional context.

  17. Developing high-performance cross-functional teams: Understanding motivations, functional loyalties, and teaming fundamentals

    Energy Technology Data Exchange (ETDEWEB)

    Miller, M.A.

    1996-08-01

    Teamwork is the key to the future of effective technology management. Today`s technologies and markets have become too complex for individuals to work alone. Global competition, limited resources, cost consciousness, and time pressures have forced organizations and project managers to encourage teamwork. Many of these teams will be cross-functional teams that can draw on a multitude of talents and knowledge. To develop high-performing cross-functional teams, managers must understand motivations, functional loyalties, and the different backgrounds of the individual team members. To develop a better understanding of these issues, managers can learn from experience and from literature on teams and teaming concepts. When studying the literature to learn about cross-functional teaming, managers will find many good theoretical concepts, but when put into practice, these concepts have varying effects. This issue of varying effectiveness is what drives the research for this paper. The teaming concepts were studied to confirm or modify current understanding. The literature was compared with a {open_quotes}ground truth{close_quotes}, a survey of the reality of teaming practices, to examine the teaming concepts that the literature finds to be critical to the success of teams. These results are compared to existing teams to determine if such techniques apply in real-world cases.

  18. Improving Engineering Student Team Collaborative Discussions by Moving Them Online: An Investigation of Synchronous Chat and Face-to-Face Team Conversations

    Science.gov (United States)

    Fowler, Robin Revette

    2014-01-01

    Collaborative learning, particularly in the context of team-based, project-based learning, is common in undergraduate engineering education and is associated with deeper learning and enhanced student motivation and retention. However, grouping students in teams for project-based learning sometimes has negative outcomes, which can include lowered…

  19. Texas Team: Academic Progression and IOM Toolkit.

    Science.gov (United States)

    Reid, Helen; Tart, Kathryn; Tietze, Mari; Joseph, Nitha Mathew; Easley, Carson

    The Institute of Medicine (IOM) Future of Nursing report, identified eight recommendations for nursing to improve health care for all Americans. The Texas Team for Advancing Health Through Nursing embraced the challenge of implementing the recommendations through two diverse projects. One group conducted a broad, online survey of leadership, practice, and academia, focusing on the IOM recommendations. The other focused specifically on academic progression through the use of CABNET (Consortium for Advancing Baccalaureate Nursing Education in Texas) articulation agreements. The survey revealed a lack of knowledge and understanding of the IOM recommendations, prompting development of an online IOM toolkit. The articulation agreements provide a clear pathway for students to the RN-to-BSN degree students. The toolkit and articulation agreements provide rich resources for implementation of the IOM recommendations.

  20. Task conflict and team creativity: a question of how much and when.

    Science.gov (United States)

    Farh, Jiing-Lih; Lee, Cynthia; Farh, Crystal I C

    2010-11-01

    Bridging the task conflict, team creativity, and project team development literatures, we present a contingency model in which the relationship between task conflict and team creativity depends on the level of conflict and when it occurs in the life cycle of a project team. In a study of 71 information technology project teams in the greater China region, we found that task conflict had a curvilinear effect on team creativity, such that creativity was highest at moderate levels of task conflict. Additionally, we found this relationship to be moderated by team phase, such that the curvilinear effect was strongest at an early phase. In contrast, at later phases of the team life cycle, task conflict was found to be unrelated to team creativity. (c) 2010 APA, all rights reserved.

  1. The relationship between servant leadership, affective team commitment and team effectiveness

    Directory of Open Access Journals (Sweden)

    Bright Mahembe

    2013-04-01

    Full Text Available Orientation: Value-based leadership practices play a critical role in teamwork in high-performance organisations.Research purpose: The aim of the study was to empirically validate a theoretical model explicating the structural relationships between servant leadership, affective team commitment and team effectiveness.Motivation for the study: The increased eliance on teams for production calls for an analysis of the role of follower-focused leadership practices in enhancing eam effectiveness.Research design, approach and method: A non-probabilityand multicultural sample consisting of 202 primary and secondary school teachers was drawn from 32 chools in the Western Cape Province of South Africa.Main findings: High levels of reliability were found and uni-dimensionality of the subscales was demonstrated through exploratory factor analyses. Good fit with the data was found for the measurement models through confirmatory factor analyses. Structural equation modelling showed a reasonable fit for the structural model. Positive relationships were found amongst servant leadership, team effectiveness and affective team commitment. Standard multiple regression analysis showed that affective team commitment moderated the relationship between servant leadership and team effectiveness.Practical/managerial implications: The findings emphasise the central role played by servant leadership and affective team commitment in team performance. Servant leadership fosters team effectiveness if employees feel committed to their work team.Contribution/value-add: The servant leadership style alone may not be a sufficient condition for team effectiveness; other variables, such as affective team commitment, also play a role. The study suggested specific variables that may also combine with leadership to positively influence team effectiveness.

  2. Pedagogical innovation in teacher teams

    DEFF Research Database (Denmark)

    Weitze, Charlotte Lærke

    2015-01-01

    This paper presents findings from a longitudinal design-based research project examining how to enable reflection and pedagogical innovation in teacher teams. The article identifies and analyses the teachers’ learning trajectories and innovative strategies when working together in the IT...... learning designs, the research aims to clarify what kind of knowledge is being developed and shared in the teacher teams, and how this contributes to the organisational learning process. The context is Global Classroom, an innovative synchronous hybrid videoconference concept, where adult students can......-pedagogical Think Tank for Teacher Teams (after this: ITP4T) (Weitze, 2014a), a competence development model, which was developed in an earlier phase of the research project. By using theoretical lenses from innovative knowledge development frameworks to examine the teachers’ utterances, interactions and new...

  3. Using and Applying Focus Groups in Climate Change Impact Assessment Projects

    Science.gov (United States)

    DeLorme, D.; Hagen, S.

    2011-12-01

    The focus group social science research method is an efficient and flexible data collection tool with broad applicability across disciplines and contexts. Through group dynamics, this interviewing approach offers strengths in gathering candid, spontaneous comments and detailed firsthand descriptions from stakeholders' perspectives. The method, which can stand alone or be integrated with other research frameworks, has much potential for helping to manage complex issues of global change. For optimal outcomes, however, careful planning and procedures are paramount. This presentation offers guidance in this regard via examples, tips, and lessons learned from a multidisciplinary NOAA-funded project: Ecological Effects of Sea Level Rise in the Northern Gulf of Mexico (EESLR-NGOM). Focus groups are a key component of the EESLR-NGOM project as they are being used to better understand coastal resource managers' operational and information behaviors and needs regarding sea level rise (SLR), erosion, and hurricane storm surge impact; to learn how to best develop and translate the project's expected scientific results into straightforward, useful, and readily-disseminated products; and to gather outreach recommendations. As part of an EESLR-NGOM project kickoff workshop, 12 coastal resource managers participated voluntarily in a focus group. A summary of findings and illustrative participant quotations will be included in the presentation. The initial focus group was productive in gaining insights into challenges and opportunities associated with a climate change project such as the EESLR-NGOM. It highlighted the importance of considering the interrelationships of natural and built environments and new avenues for resilience and sustainability. The coastal resource managers are not only end-users but also opinion leaders in their local communities who will diffuse this information widely through their networks of other potential end-users. Engaging coastal resource managers in

  4. Technology Applications Team: Applications of aerospace technology

    Science.gov (United States)

    1993-01-01

    Highlights of the Research Triangle Institute (RTI) Applications Team activities over the past quarter are presented in Section 1.0. The Team's progress in fulfilling the requirements of the contract is summarized in Section 2.0. In addition to our market-driven approach to applications project development, RTI has placed increased effort on activities to commercialize technologies developed at NASA Centers. These Technology Commercialization efforts are summarized in Section 3.0. New problem statements prepared by the Team in the reporting period are presented in Section 4.0. The Team's transfer activities for ongoing projects with the NASA Centers are presented in Section 5.0. Section 6.0 summarizes the status of four add-on tasks. Travel for the reporting period is described in Section 7.0. The RTI Team staff and consultants and their project responsibilities are listed in Appendix A. The authors gratefully acknowledge the contributions of many individuals to the RTI Technology Applications Team program. The time and effort contributed by managers, engineers, and scientists throughout NASA were essential to program success. Most important to the program has been a productive working relationship with the NASA Field Center Technology Utilization (TU) Offices. The RTI Team continues to strive for improved effectiveness as a resource to these offices. Industry managers, technical staff, medical researchers, and clinicians have been cooperative and open in their participation. The RTI Team looks forward to continuing expansion of its interaction with U.S. industry to facilitate the transfer of aerospace technology to the private sector.

  5. Exploring the concept of a team approach to wound care: Managing wounds as a team.

    Science.gov (United States)

    Moore, Zena; Butcher, Gillian; Corbett, Lisa Q; McGuiness, William; Snyder, Robert J; van Acker, Kristien

    2014-05-01

    Background - The growing prevalence and incidence of nonhealing acute and chronic wounds is a worrying concern. A major challenge is the lack of united services aimed at addressing the complex needs of individuals with wounds. However, the WHO argues that interprofessional collaboration in education and practice is key to providing the best patient care, enhancing clinical and health-related outcomes and strengthening the health system. It is based on this background that the team approach to wound care project was conceptualised. The project was jointly initiated and realised by the Association for the Advancement of Wound Care (AAWC-USA), the Australian Wound Management Association (AWMA) and the European Wound Management Association (EWMA). Aim - The aim of this project was to develop a universal model for the adoption of a team approach to wound care. Objective The overarching objective of this project was to provide recommendations for implementing a team approach to wound care within all clinical settings and through this to develop a model for advocating the team approach toward decision makers in national government levels. Method An integrative literature review was conducted. Using this knowledge, the authors arrived at a consensus on the most appropriate model to adopt and realise a team approach to wound care. Results - Eighty four articles met the inclusion criteria. Following data extraction, it was evident that none of the articles provided a definition for the terms multidisciplinary, interdisciplinary or transdisciplinary in the context of wound care. Given this lack of clarity within the wound care literature, the authors have here developed a Universal Model for the Team Approach to Wound Care to fill this gap in our current understanding. Conclusion - We advocate that the patient should be at the heart of all decision-making, as working with the Universal Model for the Team Approach to Wound Care begins with the needs of the patient. To

  6. Reaping the benefits of task conflict in teams: the critical role of team psychological safety climate.

    Science.gov (United States)

    Bradley, Bret H; Postlethwaite, Bennett E; Klotz, Anthony C; Hamdani, Maria R; Brown, Kenneth G

    2012-01-01

    Past research suggests that task conflict may improve team performance under certain conditions; however, we know little about these specific conditions. On the basis of prior theory and research on conflict in teams, we argue that a climate of psychological safety is one specific context under which task conflict will improve team performance. Using evidence from 117 project teams, the present research found that psychological safety climate moderates the relationship between task conflict and performance. Specifically, task conflict and team performance were positively associated under conditions of high psychological safety. The results support the conclusion that psychological safety facilitates the performance benefits of task conflict in teams. Theoretical implications and suggestions for future research are discussed.

  7. Forming Student Online Teams for Maximum Performance

    Science.gov (United States)

    Olson, Joel D.; Ringhand, Darlene G.; Kalinski, Ray C.; Ziegler, James G.

    2015-01-01

    What is the best way to assign graduate business students to online team-based projects? Team assignments are frequently made on the basis of alphabet, time zones or previous performance. This study reviews personality as an indicator of student online team performance. The personality assessment IDE (Insights Discovery Evaluator) was administered…

  8. SAR focusing of P-band ice sounding data using back-projection

    DEFF Research Database (Denmark)

    Kusk, Anders; Dall, Jørgen

    2010-01-01

    accommodated at the expense of computation time. The back-projection algorithm can be easily parallelized however, and can advantageously be implemented on a graphics processing unit (GPU). Results from using the back-projection algorithm on POLARIS ice sounder data from North Greenland shows that the quality...... of data is improved by the processing, and the performance of the GPU implementation allows for very fast focusing....

  9. Research 0n Incentive Mechanism of General Contractor and Subcontractors Dynamic Alliance in Construction Project Based on Team Cooperation

    Science.gov (United States)

    Yin, Honglian; Sun, Aihua; Liu, Quanru; Chen, Zhiyi

    2018-03-01

    It is the key of motivating sub-contractors working hard and mutual cooperation, ensuring implementation overall goal of the project that to design rational incentive mechanism for general contractor. Based on the principal-agency theory, the subcontractor efforts is divided into two parts, one for individual efforts, another helping other subcontractors, team Cooperation incentive models of multiple subcontractors are set up, incentive schemes and intensities are also given. The results show that the general contractor may provide individual and team motivation incentives when subcontractors working independently, not affecting each other in time and space; otherwise, the general contractor may only provide individual incentive to entice teams collaboration between subcontractors and helping each other. The conclusions can provide a reference for the subcontract design of general and sub-contractor dynamic alliances.

  10. Collocation Impact on Team Effectiveness

    Directory of Open Access Journals (Sweden)

    M Eccles

    2010-11-01

    Full Text Available The collocation of software development teams is common, specially in agile software development environments. However little is known about the impact of collocation on the team’s effectiveness. This paper explores the impact of collocating agile software development teams on a number of team effectiveness factors. The study focused on South African software development teams and gathered data through the use of questionnaires and interviews. The key finding was that collocation has a positive impact on a number of team effectiveness factors which can be categorised under team composition, team support, team management and structure and team communication. Some of the negative impact collocation had on team effectiveness relate to the fact that team members perceived that less emphasis was placed on roles, that morale of the group was influenced by individuals, and that collocation was invasive, reduced level of privacy and increased frequency of interruptions. Overall through it is proposed that companies should consider collocating their agile software development teams, as collocation might leverage overall team effectiveness.

  11. Sounds like Team Spirit

    Science.gov (United States)

    Hoffman, Edward

    2002-01-01

    I recently accompanied my son Dan to one of his guitar lessons. As I sat in a separate room, I focused on the music he was playing and the beautiful, robust sound that comes from a well-played guitar. Later that night, I woke up around 3 am. I tend to have my best thoughts at this hour. The trouble is I usually roll over and fall back asleep. This time I was still awake an hour later, so I got up and jotted some notes down in my study. I was thinking about the pure, honest sound of a well-played instrument. From there my mind wandered into the realm of high-performance teams and successful projects. (I know this sounds weird, but this is the sort of thing I think about at 3 am. Maybe you have your own weird thoughts around that time.) Consider a team in relation to music. It seems to me that a crack team can achieve a beautiful, perfect unity in the same way that a band of brilliant musicians can when they're in harmony with one another. With more than a little satisfaction I have to admit, I started to think about the great work performed for you by the Knowledge Sharing team, including this magazine you are reading. Over the past two years I personally have received some of my greatest pleasures as the APPL Director from the Knowledge Sharing activities - the Masters Forums, NASA Center visits, ASK Magazine. The Knowledge Sharing team expresses such passion for their work, just like great musicians convey their passion in the music they play. In the case of Knowledge Sharing, there are many factors that have made this so enjoyable (and hopefully worthwhile for NASA). Three ingredients come to mind -- ingredients that have produced a signature sound. First, through the crazy, passionate playing of Alex Laufer, Michelle Collins, Denise Lee, and Todd Post, I always know that something startling and original is going to come out of their activities. This team has consistently done things that are unique and innovative. For me, best of all is that they are always

  12. Teams in Education: Creating an Integrated Approach.

    Science.gov (United States)

    Arcaro, Jerome S.

    This handbook is designed to help educational professionals develop cross-functional or departmental quality teams. Nine chapters focus on: (1) the concept of Total Quality Management (TQM) and 14 points for quality in education; (2) team goals and formation; (3) stages of successful team building; (4) the development of quality task teams; (5)…

  13. Virtual Teams and Knowledge Communication

    DEFF Research Database (Denmark)

    Lehtonen, Miikka; Kampf, Constance Elizabeth

    2014-01-01

    How does culture affect virtual teams and the knowledge communication processes in which they engage? As virtual spaces are increasingly used to support teams and establish collaboration in cross-cultural projects, the notion of cross-cultural communication can be understood as shifting from...... contextual perspective to a semiotic perspective. That is to say, although the team members are using the same vocabulary they might attach different meanings to and have different knowledge about them thus highlighting the importance of approaching virtual teams and collaboration from a semiotic perspective....... To look at how knowledge about virtual work is established in a multinational context, we interviewed members of a team that connects Finland and India. Results reveal five objects shared between the team members with varying knowledge about them. By making these differences in knowledge visible through...

  14. Volunteer Team Management

    OpenAIRE

    Monych, Maria

    2015-01-01

    This thesis looked into volunteer team management in a project in AIESEC in Finland through the action research method. AIESEC in Finland is a non-profit non-government organization with a purpose of “peace and fulfilment of humankinds potential” through development of the youth’s future leadership. AIESEC was not a commissioning party; the project was the basis for the thesis without the supervision of the company. The thesis is based on a project that the author was in charge of, in ...

  15. How top management team diversity affects innovativeness and performance via the strategic choice to focus on innovation fields

    DEFF Research Database (Denmark)

    Talke, Katrin; Salomo, Søren; Rost, Katja

    2010-01-01

    Past innovation research has largely neglected potential effects of corporate governance issues on strategic choices, and thereby on innovation management outcomes. The theory of upper echelon implies that strategic choices result from idiosyncrasies of top management teams (TMT). Building...... show that TMT diversity has a strong impact on the strategic choice of firms to focus on innovation fields. Such focus then drives new product portfolio innovativeness and firm performance. As corporate governance arrangements thus seem relevant in the context of innovation management, we can derive...... on this theory, we hypothesize that TMT diversity enhances firm performance by facilitating an innovation strategy that increases the firm's new product portfolio innovativeness. Our findings support the relevance of considering a corporate governance view for explaining innovation outcomes. Empirically, we can...

  16. The relationship between servant leadership, affective team commitment and team effectiveness

    Directory of Open Access Journals (Sweden)

    Bright Mahembe

    2013-04-01

    Full Text Available Orientation: Value-based leadership practices play a critical role in teamwork in high-performance organisations. Research purpose: The aim of the study was to empirically validate a theoretical model explicating the structural relationships between servant leadership, affective team commitment and team effectiveness. Motivation for the study: The increased eliance on teams for production calls for an analysis of the role of follower-focused leadership practices in enhancing eam effectiveness. Research design, approach and method: A non-probabilityand multicultural sample consisting of 202 primary and secondary school teachers was drawn from 32 chools in the Western Cape Province of South Africa. Main findings: High levels of reliability were found and uni-dimensionality of the subscales was demonstrated through exploratory factor analyses. Good fit with the data was found for the measurement models through confirmatory factor analyses. Structural equation modelling showed a reasonable fit for the structural model. Positive relationships were found amongst servant leadership, team effectiveness and affective team commitment. Standard multiple regression analysis showed that affective team commitment moderated the relationship between servant leadership and team effectiveness. Practical/managerial implications: The findings emphasise the central role played by servant leadership and affective team commitment in team performance. Servant leadership fosters team effectiveness if employees feel committed to their work team. Contribution/value-add: The servant leadership style alone may not be a sufficient condition for team effectiveness; other variables, such as affective team commitment, also play a role. The study suggested specific variables that may also combine with leadership to positively influence team effectiveness.

  17. Submarine Medicine Team

    Data.gov (United States)

    Federal Laboratory Consortium — The Submarine Medicine Team conducts basic and applied research on biomedical aspects of submarine and diving environments. It focuses on ways to optimize the health...

  18. Assessing the impact on intercultural competencies when engineering students solve problems in multicultural teams

    DEFF Research Database (Denmark)

    Jensen, Lars Peter; Nygaard, Bjørn; Madsen, Linda

    2011-01-01

    solving problems in teams two times a year in all of their bachelor education. In at least four of the engineering education institutes in Denmark experiments on helping mixed student teams to perform better in their project work have been carried out for some years using a classic engineering trial......’ intercultural competencies. It was decided to start a formal research project to investigate some of the existing experiments helping mixed teams to cope with project work in intercultural teams. During spring 2010 the setup for the research project was developed by a group of representatives from...... as exchange students or to take a full degree. Project organized Problem based Learning is used to a high extent at most of the engineering educations in Denmark, using large scale project work (up to 15 ECTS each semester) solved in teams (3-7 students in each team). In more and more situations the teams...

  19. Developing team cognition: A role for simulation

    Science.gov (United States)

    Fernandez, Rosemarie; Shah, Sachita; Rosenman, Elizabeth D.; Kozlowski, Steve W. J.; Parker, Sarah Henrickson; Grand, James A.

    2016-01-01

    SUMMARY STATEMENT Simulation has had a major impact in the advancement of healthcare team training and assessment. To date, the majority of simulation-based training and assessment focuses on the teamwork behaviors that impact team performance, often ignoring critical cognitive, motivational, and affective team processes. Evidence from team science research demonstrates a strong relationship between team cognition and team performance and suggests a role for simulation in the development of this team-level construct. In this article we synthesize research from the broader team science literature to provide foundational knowledge regarding team cognition and highlight best practices for using simulation to target team cognition. PMID:28704287

  20. The Generational Impact in Virtual Teams

    OpenAIRE

    Ferrara, Samuel Joseph

    2016-01-01

    The world of today allows groups of people who are geographically-distributed to communicate through information and communication technologies (ICTs). In the workplace, these geographically-distributed teams are referred to as virtual teams. Quantifying and understanding issues in virtual teams has been a focus of research for the past two decades. This thesis aims to quantify generational differences between the Millennials and the Baby Boomers in the context of virtual teams in the enginee...

  1. READINGS FROM THE FORMAL DISCOURSE OF PROJECT MANAGERS REGARDING DIVERSITY IN TEAMS

    Directory of Open Access Journals (Sweden)

    Sandra Regina da Rocha-Pinto

    2012-04-01

    Full Text Available Based on the viewpoint of project managers with regards to diversity, this paper used a phenomenographic method. Fifteen project managers were interviewed. The latter focused primarily on the variety of techniques, rather than on varieties of any other kind. This view of diversity extends beyond those angles generally taken in the literature on the theme which in most instances refer to diversity as based on gender, race and disadvantaged ethnic and minority groups. Additionally, the study brings to light the fact that diversities of knowledge and behavior are as beneficial for the development of projects. Furthermore, communication and the role of the project manager were raised as mitigating factors when it came to diversity. And, lastly, the conclusion arrived at was that project managers have similar discourses which correspond to the recommendation of the main project management manuals. These discourses and forms of expression are in most cases ready-made.

  2. Construction Projects Focus on Evaluation and Its Benefits by Pre-planning

    DEFF Research Database (Denmark)

    Larsen, Jesper Kranker; Ussing, Lene Faber; Brunø, Thomas Ditlev

    2013-01-01

    are evaluations carried out? And which trade group focus most on evaluations? The study is based on a questionnaire survey for the most common trade groups in the Danish construction industry, where 167 respondents completed the survey. Findings indicate that the architect’s has most focus on evaluation in both...... internal and external project association; and evaluation has a minor focus for all the respondents where 64.5 % answer that they never, or rarely evaluate; and only a third 34.9 % of the respondents indicate that they evaluate sometimes or frequently....

  3. The Benefits of Team Teaching.

    Science.gov (United States)

    Morganti, Deena J.; Buckalew, Flora C.

    1991-01-01

    Discussion of team teaching focuses on librarians team teaching a course on information search strategy at the Pennsylvania State Berks Campus Library. Course requirements are described, planning for the course is discussed, grading practices are reviewed, and course and instructor evaluations are described. (two references) (LRW)

  4. Developing leadership in rural interprofessional palliative care teams.

    Science.gov (United States)

    Hall, Pippa; Weaver, Lynda; Handfield-Jones, Richard; Bouvette, Maryse

    2008-01-01

    This project brought together community-based practitioners and academics to develop and deliver interventions designed to enhance the leadership abilities of the designated leaders of seven rural/small town-based palliative care teams. Members of these community-based teams have already gained recognition for their teams' leadership and service delivery in their communities. All of the teams had worked closely with most members of the academic team prior to this project. The team members participated in a needs assessment exercise developed by the Sisters of Charity of Ottawa Health Service and University of Ottawa academic team. Results of the needs assessment identified leadership qualities that had contributed to their success, as well as their needs to further enhance their individual leadership qualities. The team effort, however, was the most important factor contributing to the success of their work. The interventions developed to address the identified needs had to be adapted creatively through the collaborative efforts of both the community and academic teams. The educational interventions facilitated the integration of learning at the individual and community level into the busy work schedules of primary health care providers.

  5. Improving Video Game Development: Facilitating Heterogeneous Team Collaboration through Flexible Software Processes

    Science.gov (United States)

    Musil, Juergen; Schweda, Angelika; Winkler, Dietmar; Biffl, Stefan

    Based on our observations of Austrian video game software development (VGSD) practices we identified a lack of systematic processes/method support and inefficient collaboration between various involved disciplines, i.e. engineers and artists. VGSD includes heterogeneous disciplines, e.g. creative arts, game/content design, and software. Nevertheless, improving team collaboration and process support is an ongoing challenge to enable a comprehensive view on game development projects. Lessons learned from software engineering practices can help game developers to increase game development processes within a heterogeneous environment. Based on a state of the practice survey in the Austrian games industry, this paper presents (a) first results with focus on process/method support and (b) suggests a candidate flexible process approach based on Scrum to improve VGSD and team collaboration. Results showed (a) a trend to highly flexible software processes involving various disciplines and (b) identified the suggested flexible process approach as feasible and useful for project application.

  6. Quality charters or quality members? A control theory perspective on team charters and team performance.

    Science.gov (United States)

    Courtright, Stephen H; McCormick, Brian W; Mistry, Sal; Wang, Jiexin

    2017-10-01

    Though prevalent in practice, team charters have only recently received scholarly attention. However, most of this work has been relatively devoid of theory, and consequently, key questions about why and under what conditions team charter quality affects team performance remain unanswered. To address these gaps, we draw on macro organizational control theory to propose that team charter quality serves as a team-level "behavior" control mechanism that builds task cohesion through a structured exercise. We then juxtapose team charter quality with an "input" team control mechanism that influences the emergence of task cohesion more organically: team conscientiousness. Given their redundant effects on task cohesion, we propose that the effects of team charter quality and team conscientiousness on team performance (through task cohesion) are substitutive such that team charter quality primarily impacts team performance for teams that are low (vs. high) on conscientiousness. We test and find support for our hypotheses in a sample of 239 undergraduate self-managing project teams. Our study contributes to the groups and teams literature in the following ways: first, relative to previous studies, we take a more theory-driven approach toward understanding team charters, and in doing so, uncover when and why team charter quality impacts team performance; second, we integrate two normally disparate perspectives on team effectiveness (team development and team selection) to offer a broader perspective on how teams are "built"; and third, we introduce team charter quality as a performance-enhancing mechanism for teams lower on conscientiousness. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  7. Environmental Management Integration Project/Mixed Waste Focus Area Partnership

    International Nuclear Information System (INIS)

    Gombert, D.; Kristofferson, K.; Cole, L.

    1999-01-01

    On January 16, 1998, the Assistant Secretary for the Environmental Management (EM) Program at the Department of Energy, issued DOE-Idaho the Program Integration and Systems Engineering Guidance for Fiscal Year 1998, herein called Guidance, which directed that program integration tasks be performed for all EM program areas. This guidance directed the EM Integration team, as part of the Task 1, to develop baseline waste and material disposition maps which are owned by the site Project Baseline Summary (PBS) manager. With these baselines in place Task 2 gave direction to link Science and Technology activities to the waste and material stream supported by that technology. This linkage of EM Program needs with the OST activities supports the DOE goal of maximizing cleanup at DOE sites by 2006 and provides a defensible science and technology program. Additionally, this linkage is a valuable tool in the integration of the waste and material disposition efforts for the DOE complex

  8. Gender and tenure diversity in GitHub teams

    NARCIS (Netherlands)

    Vasilescu, B.N.; Posnett, D.; Ray, B.; Brand, van den M.G.J.; Serebrenik, A.; Devanbu, P.; Filkov, V.

    2015-01-01

    Software development is usually a collaborative venture. Open Source Software (OSS) projects are no exception; indeed, by design, the OSS approach can accommodate teams that are more open, geographically distributed, and dynamic than commercial teams. This, we find, leads to OSS teams that are quite

  9. A Change in Team Culture Towards an Autonomy Supportive Working Environment - A Case Study of the Finnish Women’s National Ice Hockey Team

    OpenAIRE

    Andler, Martin

    2017-01-01

    This study presents how the change in team culture has impacted the Finnish Women’s National Ice Hockey Team. The structure of the study is based on the self-determination theory, autonomy supportive coaching and change in team culture. The sub chapters’ focus on motivation, the coaches' and athletes' role within the autonomy supportive team working environment, autonomous goal setting and transformational leadership. The subchapter for cultural change is focused on the complex on-going proce...

  10. Teaching Small Group Communication: A Do Good Project

    Directory of Open Access Journals (Sweden)

    Elizabeth M. Minei, PhD

    2016-08-01

    Full Text Available This paper focuses on the parameters of a semester-long project called the “Do Good” project, geared towards developing small group communication skills in undergraduate students. This project highlights participation in a social engagement project that allows students to bridge concepts learned in small group communication lectures (e.g., team dynamics, project management, conflict resolution, decision making, leadership with community outreach. Included are an overview of the project, and examples for how each component both challenges students’ ability to communicate in groups and provides motivation that foster students’ ability to link in-class knowledge with practical, real world application.

  11. Hearing Conservation Team

    Data.gov (United States)

    Federal Laboratory Consortium — The Hearing Conservation Team focuses on ways to identify the early stages of noise-induced damage to the human ear.Our current research involves the evaluation of...

  12. Trauma team leaders' non-verbal communication: video registration during trauma team training.

    Science.gov (United States)

    Härgestam, Maria; Hultin, Magnus; Brulin, Christine; Jacobsson, Maritha

    2016-03-25

    regularly just as technical skills need to be trained. Simulation training provides healthcare professionals the opportunity to put both verbal and non-verbal communication in focus, in order to improve patient safety. Non-verbal communication plays a decisive role in the interaction between the trauma team members, and so both verbal and non-verbal communication should be in focus in trauma team training. This is even more important for inexperienced leaders, since vague non-verbal communication reinforces ambiguity and can lead to errors.

  13. Longitudinal observations of globally distributed design teams: The impacts on Product Development

    DEFF Research Database (Denmark)

    Taylor, Thomas Paul; Ahmed-Kristensen, Saeema

    2015-01-01

    Factors impacting the success of Product Development (PD) projects are intensified when teams are distributed globally, making it a challenging task for project management to deal with effects on time, cost and quality. It is important for project management to understand when challenges......, such as communication difficulties, a lack of common vision between team members or issues related to documentation, may occur during PD projects, enabling them to take the necessary preventative action (Edmondson and Nembhard, 2009). When investigating factors impacting the success of PD, the majority of research...... studies of globally distributed design teams in PD projects. This paper aims to contribute to the further understanding of the factors impacting the success of PD projects when teams are distributed globally. With the results from a longitudinal observational study over 8 months, the factors impacting...

  14. APPLICATION OF FUZZY ANALYTIC HIERARCHY PROCESS TO BUILDING RESEARCH TEAMS

    Directory of Open Access Journals (Sweden)

    Karol DĄBROWSKI

    2016-01-01

    Full Text Available Building teams has a fundamental impact for execution of research and development projects. The teams appointed for the needs of given projects are based on individuals from both inside and outside of the organization. Knowledge is not only a product available on the market but also an intangible resource affecting their internal and external processes. Thus it is vitally important for businesses and scientific research facilities to effectively manage knowledge within project teams. The article presents a proposal to use Fuzzy AHP (Analytic Hierarchy Process and ANFIS (Adaptive Neuro Fuzzy Inference System methods in working groups building for R&D projects on the basis of employees skills.

  15. Application of Fuzzy Analytic Hierarchy Process to Building Research Teams

    Science.gov (United States)

    Dąbrowski, Karol; Skrzypek, Katarzyna

    2016-03-01

    Building teams has a fundamental impact for execution of research and development projects. The teams appointed for the needs of given projects are based on individuals from both inside and outside of the organization. Knowledge is not only a product available on the market but also an intangible resource affecting their internal and external processes. Thus it is vitally important for businesses and scientific research facilities to effectively manage knowledge within project teams. The article presents a proposal to use Fuzzy AHP (Analytic Hierarchy Process) and ANFIS (Adaptive Neuro Fuzzy Inference System) methods in working groups building for R&D projects on the basis of employees skills.

  16. Team errors: definition and taxonomy

    International Nuclear Information System (INIS)

    Sasou, Kunihide; Reason, James

    1999-01-01

    In error analysis or error management, the focus is usually upon individuals who have made errors. In large complex systems, however, most people work in teams or groups. Considering this working environment, insufficient emphasis has been given to 'team errors'. This paper discusses the definition of team errors and its taxonomy. These notions are also applied to events that have occurred in the nuclear power industry, aviation industry and shipping industry. The paper also discusses the relations between team errors and Performance Shaping Factors (PSFs). As a result, the proposed definition and taxonomy are found to be useful in categorizing team errors. The analysis also reveals that deficiencies in communication, resource/task management, excessive authority gradient, excessive professional courtesy will cause team errors. Handling human errors as team errors provides an opportunity to reduce human errors

  17. Exploring dialectical behaviour therapy clinicians' experiences of team consultation meetings.

    Science.gov (United States)

    Walsh, Cian; Ryan, Patrick; Flynn, Daniel

    2018-01-01

    This article presents a detailed idiographic analysis of Dialectical Behaviour Therapy (DBT) clinicians' experiences of team consultation meetings. DBT is an evidence-based psychological intervention with a demonstrated efficacy in the treatment of borderline personality disorder (BPD). Team consultation meetings encompass one of the primary components involved in this treatment model; where DBT clinicians regularly meet to discuss client work and enhance further learning. The present study's aim was to assess what are DBT clinicians' experiences of the consultation meeting component and whether it is useful or not. Semi-structured interviews were completed with 11 DBT clinicians (nine females, two males) from three different consultation teams. The research project utilised an interpretative phenomenological analysis (IPA) framework. Audio-recorded interview data was analysed using this framework. Four superordinate themes emerged from the interview data, which included ten subordinate themes. The superordinate themes focused on: (1) the acquisition of DBT technical knowledge and other MDT related expertise (2) participants' emotional experiences of DBT and consultation meetings, and how this can evolve over time (3) the underlying processes that occur in the consultation team including the development of a team bond and the impact of membership changes and (4) the largely consistent and reliable nature of consultation meetings and how they help maintain clinician motivation. Team consultation meetings were found to be supportive; playing an important role in maintaining clinician motivation through the availability of team support, opportunities to reflect and learn, and assistance in regulating emotions. Challenges arose in relation to team membership changes and acclimatisation to the type of feedback utilised in team consultation. The study's implications for practise are considered.

  18. Team Work and Democratic Learning in Projectmanagement Training

    DEFF Research Database (Denmark)

    Lidon, Ivan; Rebollar, Ruben; Qvist, Palle

    of Zaragoza, which makes it possible to detect problems of teamwork functioning in groups while they develop their projects, in order to prevent possible failure once projects are completed. The Democratic Learning Questionnaire developed at Aalborg University, which studies the decision-making process within...... it possible to establish a correlation between a group's decision making process and the quality of its functioning as a team.......Project Management is a discipline of a basically professional nature. Training in Project Management must provide students with a series of professional competencies, among which teamwork stands out as one of the most important, since all projects, by definition, must be carried out by teams...

  19. Rapid response teams: qualitative analysis of their effectiveness.

    Science.gov (United States)

    Leach, Linda Searle; Mayo, Ann M

    2013-05-01

    Multidisciplinary rapid response teams focus on patients' emergent needs and manage critical situations to prevent avoidable deaths. Although research has focused primarily on outcomes, studies of the actual team effectiveness within the teams from multiple perspectives have been limited. To describe effectiveness of rapid response teams in a large teaching hospital in California that had been using such teams for 5 years. The grounded-theory method was used to discover if substantive theory might emerge from interview and/or observational data. Purposeful sampling was used to conduct in-person semistructured interviews with 17 key informants. Convenience sampling was used for the 9 observed events that involved a rapid response team. Analysis involved use of a concept or indicator model to generate empirical results from the data. Data were coded, compared, and contrasted, and, when appropriate, relationships between concepts were formed. Results Dimensions of effective team performance included the concepts of organizational culture, team structure, expertise, communication, and teamwork. Professionals involved reported that rapid response teams functioned well in managing patients at risk or in crisis; however, unique challenges were identified. Teams were loosely coupled because of the inconsistency of team members from day to day. Team members had little opportunity to develop relationships or team skills. The need for team training may be greater than that among teams that work together regularly under less time pressure to perform. Communication between team members and managing a crisis were critical aspects of an effective response team.

  20. Report of Committee for JAEA Internationalization Initiative. Focusing on the activities of local teams

    International Nuclear Information System (INIS)

    2015-10-01

    The 'Committee for JAEA Internationalization Initiative' was established in 2010 with the view to discuss the policy and improvement plans for JAEA's achievement of an international center of excellence (ICOE), which include improving the environment to accept foreign researchers, etc. The existing issues to be solved in the effort for ICOE and recommendations for the solutions, which were discussed in the committee, and challenges in developing human resources with a global mindset were written in the report summarizing the activities conducted in the following two years. This report was compiled focusing on the efforts in respective sites made during a period of two years from 2013 to 2014 by the local teams that were set up in accordance with the situation of the R and D centers hosting a number of foreign researchers, etc. based on the above-mentioned recommendations. (author)

  1. Enhancing technology acceptance: The role of the subsurface contaminants focus area external integration team

    International Nuclear Information System (INIS)

    Kirwan-Taylor, H.; McCabe, G.H.; Lesperance, A.; Kauffman, J.; Serie, P.; Dressen, L.

    1996-09-01

    The US DOE is developing and deploying innovative technologies for cleaning up its contaminated facilities using a market-oriented approach. This report describes the activities of the Subsurface Contaminant Focus Area's (SCFA) External Integration Team (EIT) in supporting DOE's technology development program. The SCFA program for technology development is market-oriented, driven by the needs of end users. The purpose of EIT is to understand the technology needs of the DOE sites and identify technology acceptance criteria from users and other stakeholders to enhance deployment of innovative technologies. Stakeholders include regulators, technology users, Native Americans, and environmental and other interest groups. The success of this national program requires close coordination and communication among technology developers and stakeholders to work through all of the various phases of planning and implementation. Staff involved must be willing to commit significant amounts of time to extended discussions with the various stakeholders

  2. Enhancing technology acceptance: The role of the subsurface contaminants focus area external integration team

    Energy Technology Data Exchange (ETDEWEB)

    Kirwan-Taylor, H.; McCabe, G.H. [Battelle Seattle Research Center, WA (United States); Lesperance, A. [Pacific Northwest National Lab., Richland, WA (United States); Kauffman, J.; Serie, P.; Dressen, L. [EnvironIssues (United States)

    1996-09-01

    The US DOE is developing and deploying innovative technologies for cleaning up its contaminated facilities using a market-oriented approach. This report describes the activities of the Subsurface Contaminant Focus Area`s (SCFA) External Integration Team (EIT) in supporting DOE`s technology development program. The SCFA program for technology development is market-oriented, driven by the needs of end users. The purpose of EIT is to understand the technology needs of the DOE sites and identify technology acceptance criteria from users and other stakeholders to enhance deployment of innovative technologies. Stakeholders include regulators, technology users, Native Americans, and environmental and other interest groups. The success of this national program requires close coordination and communication among technology developers and stakeholders to work through all of the various phases of planning and implementation. Staff involved must be willing to commit significant amounts of time to extended discussions with the various stakeholders.

  3. Lights! Camera! Action Projects! Engaging Psychopharmacology Students in Service-based Action Projects Focusing on Student Alcohol Abuse.

    Science.gov (United States)

    Kennedy, Susan

    2016-01-01

    Alcohol abuse continues to be an issue of major concern for the health and well-being of college students. Estimates are that over 80% of college students are involved in the campus "alcohol culture." Annually, close to 2000 students die in the United States due to alcohol-related accidents, with another 600,000 sustaining injury due to alcohol-related incidents (NIAAA, 2013). Students enrolled in a Psychopharmacology course engaged in action projects (community outreach) focused on alcohol abuse on our campus. Research has indicated that these types of projects can increase student engagement in course material and foster important skills, including working with peers and developing involvement in one's community. This paper describes the structure and requirements of five student outreach projects and the final projects designed by the students, summarizes the grading and assessment of the projects, and discusses the rewards and challenges of incorporating such projects into a course.

  4. A circular organization chart promotes a hospital-wide focus on teams.

    Science.gov (United States)

    Fanning, M M

    1997-01-01

    Our Lady of the Way Hospital, like most hospitals in the late 1980s and early 1990s, exemplified the bureaucratic organization represented by the traditional "line and box organization chart." Additionally, as in most small hospitals, the CEO of Our Lady of the Way Hospital--a 39-bed, JCAHO accredited, general, acute care hospital in Martin, Kentucky--had direct management responsibility for several functional departments. In 1992, administration replaced the traditional, hierarchical organization chart with a circular structure that reflected its increased reliance on team processes throughout the organization. The new structure also significantly reduced the number of reporting assignments to the CEO. This article describes the hospital's transition to a team-based organization, illustrates the application of a circular organization chart, and assesses its value and limitations.

  5. Team skills training

    International Nuclear Information System (INIS)

    Coe, R.P.; Carl, D.R.

    1991-01-01

    Numerous reports and articles have been written recently on the importance of team skills training for nuclear reactor operators, but little has appeared on the practical application of this theoretical guidance. This paper describes the activities of the Training and Education Department at GPU Nuclear (GPUN). In 1987, GPUN undertook a significant initiative in its licensed operator training programs to design and develop initial and requalification team skills training. Prior to that time, human interaction skills training (communication, stress management, supervisory skills, etc.) focused more on the individual rather than a group. Today, GPU Nuclear conducts team training at both its Three Mile Island (YMI), PA and Oyster Creek (OC), NJ generating stations. Videotaped feedback is sued extensively to critique and reinforce targeted behaviors. In fact, the TMI simulator trainer has a built-in, four camera system specifically designed for team training. Evaluations conducted on this training indicated these newly acquired skills are being carried over to the work environment. Team training is now an important and on-going part of GPUN operator training

  6. Managing Communication among Geographically Distributed Teams: A Brazilian Case

    Science.gov (United States)

    Almeida, Ana Carina M.; de Farias Junior, Ivaldir H.; de S. Carneiro, Pedro Jorge

    The growing demand for qualified professionals is making software companies opt for distributed software development (DSD). At the project conception, communication and synchronization of information are critical factors for success. However problems such as time-zone difference between teams, culture, language and different development processes among sites could difficult the communication among teams. In this way, the main goal of this paper is to describe the solution adopted by a Brazilian team to improve communication in a multisite project environment. The purposed solution was based on the best practices described in the literature, and the communication plan was created based on the infrastructure needed by the project. The outcome of this work is to minimize the impact of communication issues in multisite projects, increasing productivity, good understanding and avoiding rework on code and document writing.

  7. Adaptation of Agile Project Management Methodology for Project Team

    Directory of Open Access Journals (Sweden)

    Rasnacis Arturs

    2015-12-01

    Full Text Available A project management methodology that defines basic processes, tools, techniques, methods, resources and procedures used to manage a project is necessary for effective and successful IT project management. Each company needs to define its own methodology or adapt some of the existing ones. The purpose of the research is to evaluate the possibilities of adapting IT project development methodology according to the company, company employee characteristics and their mutual relations. The adaptation process will be illustrated with a case study at an IT company in Latvia where the developed methodology is based on Agile Scrum, one of the most widespread Agile methods.

  8. Probing Aircraft Flight Test Hazard Mitigation for the Alternative Fuel Effects on Contrails & Cruise Emissions (ACCESS) Research Team

    Science.gov (United States)

    Kelly, Michael J.

    2013-01-01

    The Alternative Fuel Effects on Contrails & Cruise Emissions (ACCESS) Project Integration Manager requested in July 2012 that the NASA Engineering and Safety Center (NESC) form a team to independently assess aircraft structural failure hazards associated with the ACCESS experiment and to identify potential flight test hazard mitigations to ensure flight safety. The ACCESS Project Integration Manager subsequently requested that the assessment scope be focused predominantly on structural failure risks to the aircraft empennage raft empennage.

  9. Promoting teamwork and surgical optimization: combining TeamSTEPPS with a specialty team protocol.

    Science.gov (United States)

    Tibbs, Sheila Marie; Moss, Jacqueline

    2014-11-01

    This quality improvement project was a 300-day descriptive preintervention and postintervention comparison consisting of a convenience sample of 18 gynecology surgical team members. We administered the Team Strategies & Tools to Enhance Performance and Patient Safety (TeamSTEPPS®) Teamwork Perception Questionnaire to measure the perception of teamwork. In addition, we collected data regarding rates of compliance (ie, huddle, time out) and measurable surgical procedure times. Results showed a statistically significant increase in the number of team members present for each procedure, 2.34 μ before compared with 2.61 μ after (P = .038), and in the final time-out (FTO) compliance as a result of a clarification of the definition of FTO, 1.05 μ before compared with 1.18 μ after (P = .004). Additionally, there was improvement in staff members' perception of teamwork. The implementation of team training, protocols, and algorithms can enhance surgical optimization, communication, and work relationships. Copyright © 2014 AORN, Inc. Published by Elsevier Inc. All rights reserved.

  10. Facilitating Transition to Team Based Design Education

    DEFF Research Database (Denmark)

    Tollestrup, Christian

    2014-01-01

    profession, but at the same time it becomes very difficult to identify where and how the design is created since form-giving now becomes a group effort. So as a way to ease the transition from highly framed and facilitated high school learning context to university self-driven learning context a small...... given to two set of students; one set that received the survival kit in 2011 and 2012 and one set that did not. The questionnaire inquires the students’ attitude towards 4 aspects: 1.General level of preparedness for team and problem based project work 2.Level of information of expectations from...... supervisors and programme 3.Reflection of the role in a team, problem based project work 4.The level of information of special expectations from the Industrial Design program towards team and problem based project work. Results indicates that Class receiving the “Survival Kit” improved in the calibration...

  11. Documentation assessment, Project C-018H, 200-E area effluent treatment facility

    International Nuclear Information System (INIS)

    Peres, M.W.; Connor, M.D.; Mertelendy, J.I.

    1994-01-01

    Project C-018H is one of the fourteen subprojects to the Hanford Environmental Compliance (HEC) Project. Project C-018H provides treatment and disposal for the 242-A Evaporator and PUREX plant process condensate waste streams. This project used the Integrated Management Team (IMT) approach proposed by RL. The IMT approach included all affected organizations on the project team to coordinate and execute all required project tasks, while striving to integrate and satisfy all technical, operational, functional, and organizational objectives. The HEC Projects were initiated in 1989. Project C-018H began in early 1990, with completion of construction currently targeted for mid-1995. This assessment was performed to evaluate the effectiveness of the management control on design documents and quality assurance records developed and submitted for processing, use, and retention for the Project. The assessment focused primarily on the overall adequacy and quality of the design documentation currently being submitted to the project document control function

  12. "They Are Talking About Me, but Not with Me": A Focus Group Study to Explore the Patient Perspective on Interprofessional Team Meetings in Primary Care.

    Science.gov (United States)

    van Dongen, Jerôme Jean Jacques; de Wit, Maarten; Smeets, Hester Wilhelmina Henrica; Stoffers, Esther; van Bokhoven, Marloes Amantia; Daniëls, Ramon

    2017-08-01

    The number of people with multiple chronic conditions receiving primary care services is growing. To deal with their increasingly complex health care demands, professionals from different disciplines need to collaborate. Interprofessional team (IPT) meetings are becoming more popular. Several studies describe important factors related to conducting IPT meetings, mostly from a professional perspective. However, in the light of patient-centeredness, it is valuable to also explore the patients' perspective. The aim was to explore the patients' perspectives regarding IPT meetings in primary care. A qualitative study with a focus group design was conducted in the Netherlands. Two focus group meetings took place, for which the same patients were invited. The participants, chronically ill patients with experience on interprofessional collaboration, were recruited through the regional patient association. Participants discussed viewpoints, expectations, and concerns regarding IPT meetings in two rounds, using a focus group protocol and selected video-taped vignettes of team meetings. The first meeting focused on conceptualization and identification of themes related to IPT meetings that are important to patients. The second meeting aimed to gain more in-depth knowledge and understanding of the priorities. Discussions were audio-taped and transcribed verbatim, and analyzed by means of content analysis. The focus group meetings included seven patients. Findings were divided into six key categories, capturing the factors that patients found important regarding IPT meetings: (1) putting the patient at the center, (2) opportunities for patients to participate, (3) appropriate team composition, (4) structured approach, (5) respectful communication, and (6) informing the patient about meeting outcomes. Patients identified different elements regarding IPT meetings that are important from their perspective. They emphasized the right of patients or their representatives to take part

  13. Fuels planning: science synthesis and integration; fact sheet: The Fuels Synthesis Project overview

    Science.gov (United States)

    Rocky Mountain Research Station USDA Forest Service

    2004-01-01

    The geographic focus of the "Fuels Planning: Science Synthesis and Integration" project #known as the Fuels Synthesis Project# is on the dry forests of the Western United States. Target audiences include fuels management specialists, resource specialists, National Environmental Policy Act #NEPA# planning team leaders, line officers in the USDA Forest Service...

  14. Team Learning Ditinjau dari Team Diversity dan Team Efficacy

    OpenAIRE

    Pohan, Vivi Gusrini Rahmadani; Ancok, Djamaludin

    2010-01-01

    This research attempted to observe team learning from the level of team diversity and team efficacy of work teams. This research used an individual level of analysis rather than the group level. The team members measured the level of team diversity, team efficacy and team learning of the teams through three scales, namely team learning scale, team diversity scale, and team efficacy scale. Respondents in this research were the active team members in a company, PT. Alkindo Mitraraya. The total ...

  15. Team Learning Ditinjau dari Team Diversity dan Team Efficacy

    OpenAIRE

    Vivi Gusrini Rahmadani Pohan; Djamaludin Ancok

    2015-01-01

    This research attempted to observe team learning from the level of team diversity and team efficacy of work teams. This research used an individual level of analysis rather than the group level. The team members measured the level of team diversity, team efficacy and team learning of the teams through three scales, namely team learning scale, team diversity scale, and team efficacy scale. Respondents in this research were the active team members in a company, PT. Alkindo Mitraraya. The total ...

  16. Effective utilization of maintenance staff in design and implementation of major project work

    International Nuclear Information System (INIS)

    Wyman, D.; Dingle, J.; Brown, R.

    1995-01-01

    The reorganization of Pickering Nuclear Division some 2 years ago resulted in the formation of the Projects and Modifications department. This department takes an integrated approach to manage all aspects of large projects at Pickering. The integration of Design, Drafting, Procurement, Construction and Operations functions into project teams represents a fundamental change to project management at Pickering. The development of integrated teams has great potential for reducing both the time and cost associated with project implementation, while at the same time improving the quality, and maintainability of the commissioned in service project. The Pickering Rehab organization 1989-1993, established to perform the rehab / retube of Units 3 and 4 had proven that a team environment will produce effective results. The outcome was astounding, critical categories such as Safety, Quality of Work, and Timeliness, had proven the team's effectiveness. The integration of operations maintenance staff into the project work activities is still evolving, and has probably required the most adaptation to change for both the former Construction and Operations organizations. Maximizing the utilization of the maintenance staff in the design and implementation of major project work will prove to be a key to a long term operating success of these projects. This paper will focus in on the effective usage of Maintenance staff in the design and implementation phases of major project work at Pickering, and on the benefits realized using this approach. It will be divided into 5 sections as indicated. 1. Past Project Shortfalls. 2. Benefits of the inclusion of Maintenance staff in the Calandria Vault Rehab Project. 3. Maintenance involvement in the Pickering 'A' Shutdown System Enhancement (SDSE) Project. 4. Challenges resulting from the inclusion of Maintenance staff project teams. 5. Summary. (author)

  17. Team building: conceptual, methodological, and applied considerations.

    Science.gov (United States)

    Beauchamp, Mark R; McEwan, Desmond; Waldhauser, Katrina J

    2017-08-01

    Team building has been identified as an important method of improving the psychological climate in which teams operate, as well as overall team functioning. Within the context of sports, team building interventions have consistently been found to result in improvements in team effectiveness. In this paper we review the extant literature on team building in sport, and address a range of conceptual, methodological, and applied considerations that have the potential to advance theory, research, and applied intervention initiatives within the field. This involves expanding the scope of team building strategies that have, to date, primarily focused on developing group cohesion. Copyright © 2017 Elsevier Ltd. All rights reserved.

  18. A Measurement Framework for Team Level Assessment of Innovation Capability in Early Requirements Engineering

    Science.gov (United States)

    Regnell, Björn; Höst, Martin; Nilsson, Fredrik; Bengtsson, Henrik

    When developing software-intensive products for a market-place it is important for a development organisation to create innovative features for coming releases in order to achieve advantage over competitors. This paper focuses on assessment of innovation capability at team level in relation to the requirements engineering that is taking place before the actual product development projects are decided, when new business models, technology opportunities and intellectual property rights are created and investigated through e.g. prototyping and concept development. The result is a measurement framework focusing on four areas: innovation elicitation, selection, impact and ways-of-working. For each area, candidate measurements were derived from interviews to be used as inspiration in the development of a tailored measurement program. The framework is based on interviews with participants of a software team with specific innovation responsibilities and validated through cross-case analysis and feedback from practitioners.

  19. Networking activities in technology-based entrepreneurial teams

    DEFF Research Database (Denmark)

    Neergaard, Helle

    2005-01-01

    Based on social network theoy, this article investigates the distribution of networking roles and responsibilities in entrepreneurial founding teams. Its focus is on the team as a collection of individuals, thus allowing the research to address differences in networking patterns. It identifies six...... central networking activities and shows that not all founding team members are equally active 'networkers'. The analyses show that team members prioritize different networking activities and that one member in particular has extensive networking activities whereas other memebrs of the team are more...

  20. Intercultural Competence – Key Competence of Multicultural Teams

    Directory of Open Access Journals (Sweden)

    Diana Bebenova - Nikolova

    2014-08-01

    Full Text Available The article deals with intercultural competence of multicultural teams elaborating European projects. Firstly, it discusses basic theoretical aspects of the related concepts: culture and intercultural competence, then presents its impact on multicultural team effectiveness and models for improving it. The article finds ground on studies of intercultural competence as a set of strategic, personal, social and professional competences. The paper uses the project cycle management theory and proves that in multi-ethnic surroundings, the project membersř communication skills might not be sufficient to generate mutual understanding. Provisionally, the study performed a standardized Internet survey on self-assessment of intercultural competence among 50 experts on European projects. Another applied approach is field observation (attendance and note-taking of the 5- day training "To become diplomats between cultures", based on Bennettřs theoretical model for "Development of Intercultural Sensitivity". A training model for improving intercultural competence of multicultural team members. Possible approach for improvement of project management of crossborder or trans-border funding programs. Building intercultural competence in European project management is important, timely and necessity-driven, especially under the framework of the Danube Region Strategy.

  1. Effects of Individual Success on Globally Distributed Team Performance

    OpenAIRE

    Yılmaz, Onur

    2013-01-01

    Necessity of different competencies with high level of knowledge makes it inevitable that software development is a team work. With the today's technology, teams can communicate both synchronously and asynchronously using different online collaboration tools throughout the world. Researches indicate that there are many factors that affect the team success and in this paper, effect of individual success on globally distributed team performance will be analyzed. Student team projects undertaken...

  2. Red Teaming of Advanced Information Assurance Concepts

    International Nuclear Information System (INIS)

    DUGGAN, RUTH A.; WOOD, BRADLEY

    1999-01-01

    Red Teaming is an advanced form of assessment that can be used to identify weaknesses in a variety of cyber systems. it is especially beneficial when the target system is still in development when designers can readily affect improvements. This paper discusses the red team analysis process and the author's experiences applying this process to five selected Information Technology Office (ITO) projects. Some detail of the overall methodology, summary results from the five projects, and lessons learned are contained within this paper

  3. Team sport in organisations: the Development of a scale

    Directory of Open Access Journals (Sweden)

    YT Joubert

    2014-01-01

    Full Text Available The purpose of this study was to develop an organisational team sport scale (OTSS. A series of projects was undertaken before the development of this organisational team sport scale. The initial phase, which consisted of a qualitative study, was done to get an in-depth understanding of how employees perceive organisational team sport interventions in their organisations through focus group interviews and individual interviews (n = 72 and through the literature review. In phase 2, information obtained from phase 1 was used to develop a scale which consisted of 53 items. In phase 3, a total of 209 respondents completed the scale. The number of items was reduced to 52 through principal component analyses and a five-factor structure was suggested. The final version of the OTSS contains 52 items that assess coping skills or achieve goals, relationships among participants, physical activity and health, benefits of sport for the organisation and work/life balance. Specific issues with regard to the five-factor structure are discussed and suggestions for future research are made. The findings of this study will contribute valuable new knowledge to the literature on the development of the OTSS.

  4. Teaming. The Key to World Class Manufacturing.

    Science.gov (United States)

    Wright, John R.

    1999-01-01

    Lean manufacturing, a streamlined system of flow and job shop techniques, relies on self-directed work teams. Technology educators can prepare students for work in this environment by using problem-solving teams in the classroom to work on design briefs and other group projects. (SK)

  5. Asian Tracer Experiment and Atmospheric Modeling (TEAM) Project: Draft Field Work Plan for the Asian Long-Range Tracer Experiment

    Energy Technology Data Exchange (ETDEWEB)

    Allwine, K Jerry; Flaherty, Julia E.

    2007-08-01

    This report provides an experimental plan for a proposed Asian long-range tracer study as part of the international Tracer Experiment and Atmospheric Modeling (TEAM) Project. The TEAM partners are China, Japan, South Korea and the United States. Optimal times of year to conduct the study, meteorological measurements needed, proposed tracer release locations, proposed tracer sampling locations and the proposed durations of tracer releases and subsequent sampling are given. Also given are the activities necessary to prepare for the study and the schedule for completing the preparation activities leading to conducting the actual field operations. This report is intended to provide the TEAM members with the information necessary for planning and conducting the Asian long-range tracer study. The experimental plan is proposed, at this time, to describe the efforts necessary to conduct the Asian long-range tracer study, and the plan will undoubtedly be revised and refined as the planning goes forward over the next year.

  6. Creating Shared Understanding in Product development Teams

    DEFF Research Database (Denmark)

    Nielsen, Louise Møller; Tollestrup, Christian

    , they also have to figure out what their users and stakeholders find important. In other words, the team has to frame their project around real user needs, problems or opportunities – and figure out what people really want, and at the same time come to an agreement about this framing within the team......It is the first meeting in a new promising project. Everyone around the table is enthusiastic about the project and excited to get going. There is a good atmos¬phere and the discussion travels back and forth. Everyone tries to present their point of view, which results in a broad discussion on very...... if they have reached an agreement and everyone nods their approval. Everyone leaves the meeting, confident that they know what to do. A few weeks after, it is time for the second meeting. The team spirit is still high and there is a nice buzz in the meeting room, before the meeting starts. The introduction...

  7. Team effectiveness in academic medical libraries: a multiple case study.

    Science.gov (United States)

    Martin, Elaine Russo

    2006-07-01

    The objective of this study is to apply J. Richard Hackman's framework on team effectiveness to academic medical library settings. The study uses a qualitative, multiple case study design, employing interviews and focus groups to examine team effectiveness in three academic medical libraries. Another site was selected as a pilot to validate the research design, field procedures, and methods to be used with the cases. In all, three interviews and twelve focus groups, with approximately seventy-five participants, were conducted at the case study libraries. Hackman identified five conditions leading to team effectiveness and three outcomes dimensions that defined effectiveness. The participants in this study identified additional characteristics of effectiveness that focused on enhanced communication, leadership personality and behavior, and relationship building. The study also revealed an additional outcome dimension related to the evolution of teams. Introducing teams into an organization is not a trivial matter. Hackman's model of effectiveness has implications for designing successful library teams.

  8. Team effectiveness in academic medical libraries: a multiple case study*

    Science.gov (United States)

    Russo Martin, Elaine

    2006-01-01

    Objectives: The objective of this study is to apply J. Richard Hackman's framework on team effectiveness to academic medical library settings. Methods: The study uses a qualitative, multiple case study design, employing interviews and focus groups to examine team effectiveness in three academic medical libraries. Another site was selected as a pilot to validate the research design, field procedures, and methods to be used with the cases. In all, three interviews and twelve focus groups, with approximately seventy-five participants, were conducted at the case study libraries. Findings: Hackman identified five conditions leading to team effectiveness and three outcomes dimensions that defined effectiveness. The participants in this study identified additional characteristics of effectiveness that focused on enhanced communication, leadership personality and behavior, and relationship building. The study also revealed an additional outcome dimension related to the evolution of teams. Conclusions: Introducing teams into an organization is not a trivial matter. Hackman's model of effectiveness has implications for designing successful library teams. PMID:16888659

  9. What makes maternity teams effective and safe? Lessons from a series of research on teamwork, leadership and team training.

    Science.gov (United States)

    Siassakos, Dimitrios; Fox, Robert; Bristowe, Katherine; Angouri, Jo; Hambly, Helen; Robson, Lauren; Draycott, Timothy J

    2013-11-01

    We describe lessons for safety from a synthesis of seven studies of teamwork, leadership and team training across a healthcare region. Two studies identified successes and challenges in a unit with embedded team training: a staff survey demonstrated a positive culture but a perceived need for greater senior presence; training improved actual emergency care, but wide variation in team performance remained. Analysis of multicenter simulation records showed that variation in patient safety and team efficiency correlated with their teamwork but not individual knowledge, skills or attitudes. Safe teams tended to declare the emergency earlier, hand over in a more structured way, and use closed-loop communication. Focused and directed communication was also associated with better patient-actor perception of care. Focus groups corroborated these findings, proposed that the capability and experience of the leader is more important than seniority, and identified teamwork and leadership issues that require further research. © 2013 Nordic Federation of Societies of Obstetrics and Gynecology.

  10. The big five personality traits and individual satisfaction with the team

    NARCIS (Netherlands)

    Peeters, Miranda A.G.; Rutte, Christel G.; van Tuijl, Harrie F.J.M.; Reymen, Isabelle

    2006-01-01

    Relationships between team composition in terms of team members' Big Five personality traits and individual satisfaction with the team after project completion were researched. Questionnaires were filled out by 310 undergraduate students (N= 68 teams) working on an engineering design assignment.

  11. Implementing an interprofessional patient safety learning initiative: insights from participants, project leads and steering committee members.

    Science.gov (United States)

    Jeffs, Lianne; Abramovich, Ilona Alex; Hayes, Chris; Smith, Orla; Tregunno, Deborah; Chan, Wai-Hin; Reeves, Scott

    2013-11-01

    Effective teamwork and interprofessional collaboration are vital for healthcare quality and safety; however, challenges persist in creating interprofessional teamwork and resilient professional teams. A study was undertaken to delineate perceptions of individuals involved with the implementation of an interprofessional patient safety competency-based intervention and intervention participants. The study employed a qualitative study design that triangulated data from interviews with six steering committee members and five members of the project team who developed and monitored the intervention and six focus groups with clinical team members who participated in the intervention and implemented local patient safety projects within a large teaching hospital in Canada. Our study findings reveal that healthcare professionals and support staff acquired patient safety competencies in an interprofessional context that can result in improved patient and work flow processes. However, key challenges exist including managing projects amidst competing priorities, lacking physician engagement and sustaining projects. Our findings point to leaders to provide opportunities for healthcare teams to engage in interprofessional teamwork and patient safety projects to improve quality of patient care. Further research efforts should examine the sustainability of interprofessional safety projects and how leaders can more fully engage the participation of all professions, specifically physicians.

  12. Comparison of Two Team Learning and Team Entrepreneurship Models at a Finnish University of Applied Sciences. Setting the Scene for Future Development

    Directory of Open Access Journals (Sweden)

    Pasi Juvonen

    2017-02-01

    environment. This would foster col-laboration between different disci-plines, e.g. marketing and ICT. Fur-thermore, the emerging ideation, ser-vice design and experimentation eco-system which we are developing in ongoing RDI projects, would be strengthened by adding more students focused on ICT competencies into it. The article was later extended to include interview data from 12 theme-based specialist interviews where the thoughts of original article were tested among administration of our campus, RDI funder, experienced and former team entrepreneurs, and local entre-preneurs. The results validated the author’s previous suggestions of how future ICT education should be organized and also provided some new targets for development. The essential find-ings were: The future ICT education should be deployed in a way that it a develops students’ entrepreneurial mindset b offers versatile coopera-tion possibilities with existing market-ing team entrepreneurs and other en-terprises, and c the current ecosystem should be internationalized.

  13. MANAGING LARGE INVESTMENT PROJECTS IN GORJ

    Directory of Open Access Journals (Sweden)

    CÎRNU DORU

    2016-12-01

    Full Text Available Currently, the concept of project management is considered to be the best concept for efficient management of a project, so it is used all over the world, and most recently in our country. This concept is designed with all the general characteristics of project management, but adapted to the large investment projects. This paper presents the project management concept and project management organization for capital projects. This concept is conceived with all general characteristics of project management, but adopted to the condition of large investment projects. The concept also includes the project team and the project manager, the person authorized and responsible for achieving the objectives planned in the project. For efficient managing by project, it is necessary to insure a good compozition of project team, as a team of people who, in collaboration with project manager, work directly on managing the project. To effectively manage the project, it is necessary to ensure a proper composition of the project team, a team of people who, in collaboration with the project manager to work directly for project management. It is a particularly good method of achieving the objectives planned projects, which means a project with a certain level of performance required in a planned time, with planned costs.

  14. The potential improvement of team-working skills in Biomedical and Natural Science students using a problem-based learning approach

    Directory of Open Access Journals (Sweden)

    Forough L. Nowrouzian

    2013-08-01

    Full Text Available Teamwork has become an integral part of most organisations today, and it is clearly important in Science and other disciplines. In Science, research teams increase in size while the number of single-authored papers and patents decline. Team-work in laboratory sciences permits projects that are too big or complex for one individual to be tackled. This development requires that students gain experience of team-work before they start their professional career. Students working in teams this may increase productivity, confidence, innovative capacity and improvement of interpersonal skills. Problem-based learning (PBL is an instructional approach focusing on real analytical problems as a means of training an analytical scientist. PBL may have a positive impact on team-work skills that are important for undergraduates and postgraduates to enable effective collaborative work. This survey of the current literature explores the development of the team-work skills in Biomedical Science students using PBL.

  15. Improving collaborative work and project management in a nuclear power plant design team: A human-centered design approach

    International Nuclear Information System (INIS)

    Boy, Guy André; Jani, Gopal; Manera, Annalisa; Memmott, Matthew; Petrovic, Bojan; Rayad, Yassine; Stephane, Lucas; Suri, Neha

    2016-01-01

    This article presents a collaborative system, called SCORE, useful for a multi-disciplinary team designing a new nuclear power plant (NPP). It was developed during the first phase of the I 2 S-LWR project (Integral Inherently Safe Light Water Reactor). SCORE enables the generation of design cards (DCs). A DC includes four main spaces (Boy, 2005): (1) a rationalization space where the various components of the system being designed (SBD) are described in terms of design rationale, integration and requirements; this space includes declarative and procedural descriptions and statements; (2) an activity space where the current version of the SBD is displayed; it includes static and dynamic features; this space enables SBD manipulation; (3) a structure space where the various components and their inter-relations are formally and declaratively described as systems of systems; (4) a function space where the various functions of the SBD are described in terms of procedural knowledge and dynamic processes involved; this space includes qualitative and quantitative physical and cognitive models. The rationalization space is informed using an adapted version of the QOC method (Questions, Options, Criteria), which was tested within the I 2 S-LWR design team. The activity space contains 3D models developed using AutoDesk Inventor, and transferred into the Unity game engine web player in order to facilitate integration within the DC spaces and enable intuitive manipulation of objects in the activity space. Two additional spaces were added: an instant messaging capability that allows design team members (DTMs) to exchange with one another on a DC; and a structured evaluation space. DCs are cooperatively created and refined by DTMs, and synthesized during periodic design meetings, the frequency of which may vary. Incrementally combining abstract explanations of designed elements and integration with their explicit visual representation improves mutual understanding among DTMs, and

  16. Massachusetts State Police Special Tactical Operations Team User Focus Group Report - Law Enforcement Advanced Protection (LEAP) Duty Uniforms, Integrated Head Protection, Chemical/Biological Protection and Human Systems Integration

    National Research Council Canada - National Science Library

    Creighton, II, Thomas E; Hibbard, Bradley; Doherty, Stephen; McManus, Kelly

    2008-01-01

    ...) from representatives within the law enforcement community. This focus group consisted exclusively of personnel assigned to the Massachusetts State Police Special Tactical Operations (STOP) Team...

  17. How to Begin a Quality Improvement Project.

    Science.gov (United States)

    Silver, Samuel A; Harel, Ziv; McQuillan, Rory; Weizman, Adam V; Thomas, Alison; Chertow, Glenn M; Nesrallah, Gihad; Bell, Chaim M; Chan, Christopher T

    2016-05-06

    Quality improvement involves a combined effort among health care staff and stakeholders to diagnose and treat problems in the health care system. However, health care professionals often lack training in quality improvement methods, which makes it challenging to participate in improvement efforts. This article familiarizes health care professionals with how to begin a quality improvement project. The initial steps involve forming an improvement team that possesses expertise in the quality of care problem, leadership, and change management. Stakeholder mapping and analysis are useful tools at this stage, and these are reviewed to help identify individuals who might have a vested interest in the project. Physician engagement is a particularly important component of project success, and the knowledge that patients/caregivers can offer as members of a quality improvement team should not be overlooked. After a team is formed, an improvement framework helps to organize the scientific process of system change. Common quality improvement frameworks include Six Sigma, Lean, and the Model for Improvement. These models are contrasted, with a focus on the Model for Improvement, because it is widely used and applicable to a variety of quality of care problems without advanced training. It involves three steps: setting aims to focus improvement, choosing a balanced set of measures to determine if improvement occurs, and testing new ideas to change the current process. These new ideas are evaluated using Plan-Do-Study-Act cycles, where knowledge is gained by testing changes and reflecting on their effect. To show the real world utility of the quality improvement methods discussed, they are applied to a hypothetical quality improvement initiative that aims to promote home dialysis (home hemodialysis and peritoneal dialysis). This provides an example that kidney health care professionals can use to begin their own quality improvement projects. Copyright © 2016 by the American

  18. Scaffolding Project-Based Learning with the Project Management Body of Knowledge (PMBOK[R])

    Science.gov (United States)

    van Rooij, Shahron Williams

    2009-01-01

    This paper reports the results of a study of the extent to which processes and procedures from the discipline of project management can scaffold online project-based learning in a graduate-level instructional technology course, by facilitating intra-team interaction, enhancing project outcomes and promoting a positive project team experience. With…

  19. Sports injury and illness epidemiology: Great Britain Olympic Team (TeamGB) surveillance during the Sochi 2014 Winter Olympic Games.

    Science.gov (United States)

    Palmer-Green, Debbie; Elliott, Niall

    2015-01-01

    Sports injury and illness surveillance is the first step in injury and illness prevention, and is important for the protection of both athlete health and performance in major competitions. To identify the prevalence, severity nature and causes of athlete injuries and illnesses in the Great Britain Olympic Team (TeamGB) during the Sochi 2014 Winter Olympic Games. The observational prospective cohort study followed the Great Britain Injury/Illness Performance Project surveillance methodology and obtained information on injuries and illnesses that occurred during the Games between 30 January and 23 February 2014 in TeamGB athletes (n=56). Among the 56 TeamGB athletes, there were 27 injuries and 11 illnesses during the Olympic Games period. This equated to 39% sustaining at least one injury and 18% at least one illness, with an incidence of 48.2 injuries and 19.6 illnesses per 100 athletes, respectively. Of all injuries and illnesses, 9% and 7%, respectively, resulted in time loss. The risk of sustaining an injury was highest for freestyle skiing, skeleton and snowboarding; and lowest for curling, biathlon and Alpine skiing (with no reported injuries); with the lower limb being the most commonly injured location. Respiratory system illnesses were most frequently reported overall, and older female athletes were the ones most affected by illness. The risk of injury was double the risk of illness for TeamGB athletes. Overall, the rate of time-loss issues was low. Methodological considerations are important when interpreting data, and prevention strategies should focus on those issues causing the greatest risk, in terms of prevalence and severity, to athlete health and performance. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  20. Factors associated with continuance commitment to FAA matrix teams.

    Science.gov (United States)

    1993-11-01

    Several organizations within the FAA employ matrix teams to achieve cross-functional coordination. Matrix team members typically represent different organizational functions required for project accomplishment (e.g., research and development, enginee...

  1. One System Integrated Project Team Progress in Coordinating Hanford Tank Farms and the Waste Treatment Plant

    International Nuclear Information System (INIS)

    Skwarek, Raymond J.; Harp, Ben J.; Duncan, Garth M.

    2013-01-01

    The One System Integrated Project Team (IPT) was formed at the Hanford Site in late 2011 as a way to improve coordination and itegration between the Hanford Tank Waste Treatment and Immobilization Plant (WTP) and the Tank Operations Contractor (TOC) on interfaces between the two projects, and to eliminate duplication and exploit opportunities for synergy. The IPT is composed of jointly staffed groups that work on technical issues of mutal interest, front-end design and project definition, nuclear safety, plant engineering system integration, commissioning, planning and scheduling, and environmental, safety, health and quality (ESH&Q) areas. In the past year important progress has been made in a number of areas as the organization has matured and additional opportunities have been identified. Areas covered in this paper include: Support for development of the Office of Envirnmental Management (EM) framework document to progress the Office of River Protection's (ORP) River Protection Project (RPP) mission; Stewardship of the RPP flowsheet; Collaboration with Savannah River Site (SRS), Savannah River National Laboratory (SRNL), and Pacific Northwest National Laboratory (PNNL); Operations programs integration; and, Further development of the waste acceptance criteria

  2. Developing your Career in an Age of Team-Science

    Science.gov (United States)

    Zucker, Deborah

    2013-01-01

    Academic institutions and researchers are becoming increasingly involved in translational research to spur innovation in addressing many complex biomedical and societal problems, and in response to the focus of the NIH and other funders. One approach to translational research is to development interdisciplinary research teams. By bringing together collaborators with diverse research backgrounds and perspectives, these teams seek to blend their science and the workings of the scientists to push beyond the limits of current research. While team-science promises individual and team benefits in creating and implementing innovations, its increased complexity poses challenges. In particular, since academic career advancement commonly focuses on individual achievement, team-science might differentially impact early stage researchers. This need to be recognized for individual accomplishments in order to move forward in an academic career may give rise to research-team conflicts. Raising awareness to career-related aspects of team science will help individuals (particularly trainees and junior faculty) take steps to align their excitement and participation with the success of both the team and their personal career advancement. PMID:22525235

  3. Speeding up development activities in student projects with time boxing and scrum

    DEFF Research Database (Denmark)

    Ovesen, Nis; Eriksen, Kaare; Tollestrup, Christian

    2011-01-01

    This research project investigates how procedures from agile software development can be of benefit to development activities in projects of design engineering students. The agile methods Scrum and Time boxing are evaluated through a student workshop focusing on near-future concepts for design...... competitions. Scrum meetings within the student design teams are conducted and video documented each hour throughout the workshop activities as a structured process evaluation tool. Based on a subsequent student survey it is argued that scrum and time boxing are strengthening the focus, communication...

  4. Distinguishing between taskwork and teamwork planning in teams: relations with coordination and interpersonal processes.

    Science.gov (United States)

    Fisher, David M

    2014-05-01

    Planning in teams represents a critical process that lays the groundwork for effective team functioning. The current investigation examined whether emergent team planning can be meaningfully characterized in terms of a distinction between planning that focuses on taskwork and planning that focuses on teamwork. In Study 1, items written to reflect commonly identified indicators of team planning were subjected to an exploratory factor analysis. In Study 2, slightly modified items were provided to a separate sample, and a confirmatory factor analysis was conducted. In Study 3, the relationships between the different forms of planning and other team processes (i.e., coordination, interpersonal processes) were examined in order to determine whether there are unique relationships for task-focused and team-focused planning. Results from the first 2 studies provided support for a 2-factor structure of team planning, whereas Study 3 found independent relationships for taskwork and teamwork planning with subsequent team processes. Both forms of planning also exhibited indirect relationships with team performance via the mediating role of subsequent team processes. (c) 2014 APA, all rights reserved.

  5. Making star teams out of star players.

    Science.gov (United States)

    Mankins, Michael; Bird, Alan; Root, James

    2013-01-01

    Top talent is an invaluable asset: In highly specialized or creative work, for instance, "A" players are likely to be six times as productive as "B" players. So when your company has a crucial strategic project, why not multiply all that firepower and have a team of your best performers tackle it? Yet many companies hesitate to do this, believing that all-star teams don't work: Big egos will get in the way. The stars won't be able to work with one another. They'll drive the team Leader crazy. Mankins, Bird, and Root of Bain & Company believe it's time to set aside that thinking. They have seen all-star teams do extraordinary work. But there is a right way and a wrong way to organize them. Before you can even begin to assemble such a team, you need to have the right talent management practices, so you hire and develop the best people and know what they're capable of. You have to give the team appropriate incentives and leaders and support staffers who are stars in their own right. And projects that are ill-defined or small scale are not for all-star teams. Use them only for critical missions, and make sure their objectives are clear. Even with the right setup, things can still go wrong. The wise executive will take steps to manage egos, prune non-team-players, and prevent average coworkers from feeling completely undervalued. She will also invest a lot of time in choosing the right team Leader and will ask members for lots of feedback to monitor how that leader is doing.

  6. Managing Global Virtual Teams across Classrooms, Students and Faculty

    Science.gov (United States)

    Shea, Timothy P.; Sherer, Pamela D.; Quilling, Rosemary D.; Blewett, Craig N.

    2011-01-01

    Virtual teams are becoming commonplace in business today so our business school students should have experience in effectively working in virtual teams. Based on a month-long virtual team project conducted by the authors between classes in South Africa and the United States, this paper discusses the opportunities and challenges of using global…

  7. Sustainable Relations in International Development Cooperation Projects: The Role of Organizational Climate

    Directory of Open Access Journals (Sweden)

    Cosimo Rota

    2011-10-01

    Full Text Available  The importance of the human side of project management to assess the success of international development project has not been fully considered yet. An analysis of the literature on the project success definition, focused on the success criteria and success factors, was carried out. The organization’s effectiveness, in terms of Relations Sustainability, emerged as a criteria integrating the "time, cost, performance" approach to define a project success. Based on previous research contributions on the factors influencing the organization’s effectiveness, the paper expands the analysis of the influence of Organizational Climate on the Relation Sustainability between project manager and project team involved in international cooperation for development. The statistical methods used include confirmatory factors analysis and structural equation modeling. The results carry implications for project management identifying five dimensions of Organizational Climate (trust, innovation, social cohesion, communication and job challenge influencing Relations Sustainability. This finding suggests that Organizational Climate contributes to project success by creating trust, stimulating commitment and generating satisfaction to overcome conflicts between project manager and project team.

  8. The role of social capital on trust development and dynamics: Implications for cooperation, monitoring and team performance

    NARCIS (Netherlands)

    Costa, A.C.; Bijlsma-Frankema, K.M.; de Jong, B.A.

    2009-01-01

    This study examined the development and dynamics of trust in project teams and explored the relation with cooperation, monitoring and team performance. Two types of teams were distinguished at the start of the projects: low prior social-capital teams (teams composed of members that have no previous

  9. Patients as team members: opportunities, challenges and paradoxes of including patients in multi-professional healthcare teams.

    Science.gov (United States)

    Martin, Graham P; Finn, Rachael

    2011-11-01

    Current healthcare policy emphasises the need for more collaborative, team-based approaches to providing care, and for a greater voice for service users in the management and delivery of care. Increasingly, policy encourages 'partnerships' between users and professionals so that users, too, effectively become team members. In examining this phenomenon, this paper draws on insights from the organisational-sociological literature on team work, which highlights the challenges of bringing together diverse professional groups, but which has not, to date, been applied in contexts where users, too, are included in teams. Using data from a qualitative study of five pilot cancer-genetics projects, in which service users were included in teams responsible for managing and developing new services, it highlights the difficulties involved in making teams of such heterogeneous members-and the paradoxes that arise when this task is achieved. It reveals how the tension between integration and specialisation of team members, highlighted in the literature on teams in general, is especially acute for service users, the distinctiveness of whose contribution is more fragile, and open to blurring. © 2011 The Authors. Sociology of Health & Illness © 2011 Foundation for the Sociology of Health & Illness/Blackwell Publishing Ltd.

  10. Student Teachers' Team Teaching: How Do Learners in the Classroom Experience Team-Taught Lessons by Student Teachers?

    Science.gov (United States)

    Baeten, Marlies; Simons, Mathea

    2016-01-01

    This study focuses on student teachers' team teaching. Two team teaching models (sequential and parallel teaching) were applied by 14 student teachers in a quasi-experimental design. When implementing new teaching models, it is important to take into account the perspectives of all actors involved. Although learners are key actors in the teaching…

  11. Collective Global Leadership in Self-Managed Multicultural Teams

    DEFF Research Database (Denmark)

    Paunova, Minna; Lee, Yih-Teen

    2016-01-01

    Arguing that it is necessary to look into specific global leadership processes in specific contexts, this article focuses on collective global leadership in self-managed multicultural teams using an input-process-output model. Building on a study of nationally and culturally diverse self-managed...... teams, our work demonstrates that collective global leadership in these teams is critical for team performance (output). Our study also examines some of the affective or attitudinal antecedents of collective global leadership in self-managed multicultural teams (process) and their members’ goal...... orientations (input). Our findings suggest that a team learning orientation may greatly help multicultural teams overcome the liability of cultural diversity, create a positive intra-team environment, and enable collective global leadership. Our research also suggests that team performance orientation...

  12. Conflict Approaches of Effective Project Manager in the Upstream Sector of Indonesian Oil & Gas Industry

    OpenAIRE

    Adhi Cahyono; Yanki Hartijasti

    2012-01-01

    Conflict can be functional or dysfunctional to the organization’s performance. This study focused on the relationship between conflict approaches implemented by the project manager based on project team member’s perception on the effectiveness of the project manager in managing project’s conflict. Questionnaires were modified from Barker et al. (1988) to measure conflict management approaches and outcomes of managing project conflict. Data were gathered from 57 respondents w...

  13. Spent Nuclear Fuel (SNF) Project Safety Basis Implementation Strategy

    International Nuclear Information System (INIS)

    TRAWINSKI, B.J.

    2000-01-01

    The objective of the Safety Basis Implementation is to ensure that implementation of activities is accomplished in order to support readiness to move spent fuel from K West Basin. Activities may be performed directly by the Safety Basis Implementation Team or they may be performed by other organizations and tracked by the Team. This strategy will focus on five key elements, (1) Administration of Safety Basis Implementation (general items), (2) Implementing documents, (3) Implementing equipment (including verification of operability), (4) Training, (5) SNF Project Technical Requirements (STRS) database system

  14. The European Union's four-man team of experts attending a demonstration of the DataGrid Project at CERN in early February.

    CERN Multimedia

    2003-01-01

    The DataGrid Project is reviewed by a team of European experts on a yearly basis. At the beginning of February it passed the second of these reviews with flying colours, the four experts issuing enthusiastic statements on the latest progress made, which was quite considerable in 2002.

  15. Team Training for Dynamic Cross-Functional Teams in Aviation: Behavioral, Cognitive, and Performance Outcomes.

    Science.gov (United States)

    Littlepage, Glenn E; Hein, Michael B; Moffett, Richard G; Craig, Paul A; Georgiou, Andrea M

    2016-12-01

    This study evaluates the effectiveness of a training program designed to improve cross-functional coordination in airline operations. Teamwork across professional specializations is essential for safe and efficient airline operations, but aviation education primarily emphasizes positional knowledge and skill. Although crew resource management training is commonly used to provide some degree of teamwork training, it is generally focused on specific specializations, and little training is provided in coordination across specializations. The current study describes and evaluates a multifaceted training program designed to enhance teamwork and team performance of cross-functional teams within a simulated airline flight operations center. The training included a variety of components: orientation training, position-specific declarative knowledge training, position-specific procedural knowledge training, a series of high-fidelity team simulations, and a series of after-action reviews. Following training, participants demonstrated more effective teamwork, development of transactive memory, and more effective team performance. Multifaceted team training that incorporates positional training and team interaction in complex realistic situations and followed by after-action reviews can facilitate teamwork and team performance. Team training programs, such as the one described here, have potential to improve the training of aviation professionals. These techniques can be applied to other contexts where multidisciplinary teams and multiteam systems work to perform highly interdependent activities. © 2016, Human Factors and Ergonomics Society.

  16. Confluence and convergence: team effectiveness in complex systems.

    Science.gov (United States)

    Porter-OʼGrady, Tim

    2015-01-01

    Complex adaptive systems require nursing leadership to rethink organizational work and the viability and effectiveness of teams. Much of emergent thinking about complexity and systems and organizations alter the understanding of the nature and function of teamwork and the configuration and leadership of team effort. Reflecting on basic concepts of complexity and their application to team formation, dynamics, and outcomes lays an important foundation for effectively guiding the strategic activity of systems through the focused tactical action of teams. Basic principles of complexity, their impact on teams, and the fundamental elements of team effectiveness are explored.

  17. Characteristics of team briefings in gynecological surgery.

    Science.gov (United States)

    Forsyth, Katherine L; Hildebrand, Emily A; Hallbeck, M Susan; Branaghan, Russell J; Blocker, Renaldo C

    2018-02-24

    Preoperative briefings have been proven beneficial for improving team performance in the operating room. However, there has been minimal research regarding team briefings in specific surgical domains. As part of a larger project to develop a briefing structure for gynecological surgery, the study aimed to better understand the current state of pre-operative team briefings in one department of an academic hospital. Twenty-four team briefings were observed and video recorded. Communication was analyzed and social network metrics were created based on the team member verbal interactions. Introductions occurred in only 25% of the briefings. Network analysis revealed that average team briefings exhibited a hierarchical structure of communication, with the surgeon speaking the most frequently. The average network for resident-led briefings displayed a non-hierarchical structure with all team members communicating with the resident. Briefings conducted without a standardized protocol can produce variable communication between the role leading and the team members present. Copyright © 2018 Elsevier Ltd. All rights reserved.

  18. Intra project team disagreement, conflict communications, and team performance in cross-functional new product teams: A decision-making quality perspective

    Directory of Open Access Journals (Sweden)

    Tsun Jin Chang

    2014-02-01

    Full Text Available This paper develops and examines a model of the antecedents and consequences of decision-making comprehensiveness during the new product development process. This model firstly suggests a concave relationship between intrateam task disagreement and decision-making comprehensiveness. It also conjectures that conflict communications influence the effectiveness of decision-making comprehensiveness on new product teams’ performance. An empirical test of the proposed framework involves a survey of 220 cross-functional new product teams. The findings show that an inverse U-shaped relationship exists between intrateam task disagreement and decision-making comprehensiveness. It also indicates that collaborative communication has a negative effect on innovativeness, whereas contentious communication adversely affects constraint adherence. However, decision-making comprehensiveness partially moderates the relationships between conflict communications and team performance. Some managerial and research implications of the findings were also discussed in this study.

  19. Essence: Team-Based Software Innovation

    DEFF Research Database (Denmark)

    Aaen, Ivan

    2012-01-01

    Essence is a methodology supporting innovative software teams. It is designed with agile development in mind to allow for the problem situation to talk back to the team as they go along building solutions. Traditional software development teams – and for that matter probably also development teams...... using technologies other than software – might also enjoy adapting Essence to suit their situation. Essence is not yet another method for generating ideas. There are plenty of good methods already, and for that reason I choose to focus less on idea generation and more on the thereafter. Most teams....... Essence is based on the idea that challenges are open to interpretation and choice. We may often choose how we understand a challenge and choose among several strategies for answering it. Software development and indeed software innovation are far from linear. Essence is built on structures rather than...

  20. Three images of interdisciplinary team meetings.

    Science.gov (United States)

    Crepeau, E B

    1994-08-01

    Teams are an essential aspect of health care today, especially in rehabilitation or chronic illness where the course of care is frequently long, complex, and unpredictable. The coordinative function of teams and their interdisciplinary aspects are thought to improve patient care because team members bring their unique professional skills together to address patient problems. This coordination is enacted through the team meeting, which typically results in an integrated care plan. This professional image of team meetings is explicit and addresses the description and provision of care as objective and rational activities. In contrast, the constructed and ritualistic images of health care team meetings are implicit and concern the less objective and rational aspects of planning care. The constructed image pertains to the definitional activity of team members as they try to understand patient troubles and achieve consensus. This process involves the individual clinical reasoning of team members and the collective reasoning of the group. The ritualistic image is that aspect of team meetings in which the team affirms and reaffirms its collective identity. Drawing from field research of geropsychiatric team meetings, this article defines and explicates these images, focusing on the constructed and ritualistic aspects of team meetings and the influence of these images on group function.

  1. Enhancing Mathematical Communication for Virtual Math Teams

    Science.gov (United States)

    Stahl, Gerry; Çakir, Murat Perit; Weimar, Stephen; Weusijana, Baba Kofi; Ou, Jimmy Xiantong

    2010-01-01

    The Math Forum is an online resource center for pre-algebra, algebra, geometry and pre-calculus. Its Virtual Math Teams (VMT) service provides an integrated web-based environment for small teams of people to discuss math and to work collaboratively on math problems or explore interesting mathematical micro-worlds together. The VMT Project studies…

  2. Enhancing Mathematical Communication for Virtual Math Teams

    Directory of Open Access Journals (Sweden)

    Gerry Stahl

    2010-06-01

    Full Text Available The Math Forum is an online resource center for pre-algebra, algebra, geometry and pre-calculus. Its Virtual Math Teams (VMT service provides an integrated web-based environment for small teams of people to discuss math and to work collaboratively on math problems or explore interesting mathematical micro-worlds together. The VMT Project studies the online math discourse that takes place during sessions of virtual math teams working on open-ended problem-solving tasks. In particular, it investigates methods of group cognition that are employed by teams in this setting. The VMT environment currently integrates social networking, synchronous text chat, a shared whiteboard for drawing, web browsers and an asynchronous wiki for exchanging findings within the larger community. A simple version of MathML is supported in the whiteboard, chat and wiki for displaying mathematical expressions. The VMT Project is currently integrating the dynamic mathematics application, GeoGebra, into its collaboration environment. This will create a multi-user version of GeoGebra, which can be used in concert with the chat, web browsers, curricular topics and wiki repository.

  3. Foundations for a Team Oriented Curriculum

    Science.gov (United States)

    Neal, Brandi; Martz, Ben

    2016-01-01

    The business world today values collaboration and team work skills such as those found in the area of project management, business process reengineering, quality circles, etc. In response, the use of group projects permeates many curricula today with varying consequences and levels of success. Technology claims to enhance collaboration in…

  4. A century of work teams in the Journal of Applied Psychology.

    Science.gov (United States)

    Mathieu, John E; Hollenbeck, John R; van Knippenberg, Daan; Ilgen, Daniel R

    2017-03-01

    Work groups are a vital link between individuals and organizations. Systematic psychological research on the nature and effects of work groups dates back at least to the Hawthorne studies of the 1920s and 1930s. Yet little to none of this work appeared in the Journal of Applied Psychology until the 1950s when groups were treated primarily as foils against which to compare the performance of individuals. From the 1990s to the present, the volume of research and the nature of topics addressing work group/teams expanded significantly. The authors review the evolution of team research over the past century with a particular focus on that which has appeared in this journal. They chronicle the shift from a focus on individuals within teams, or on individual versus team comparisons, to a focus on the team itself and larger systems of teams. They describe the major outcomes studied within this literature, and how they relate to the nature of team tasks and structures. Further, the authors consider the roles of team members' characteristics and composition, and team dynamics in terms of processes and emergent states. They close with a call for future research that models dynamic team relationships in context and as they operate in complex systems. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  5. Are High Achievers Successful in Collaborative Learning? An Explorative Study of College Students' Learning Approaches in Team Project-Based Learning

    Science.gov (United States)

    Lee, Hye-Jung; Kim, Hyekyung; Byun, Hyunjung

    2017-01-01

    This study analyses how high-achieving students approach team project-based learning (TPBL) and aims to identify the implications and challenges of TPBL practice in higher education. After interviewing 32 high-achieving students and surveying 1022 additional students at a South Korean university, we found that four factors were particularly…

  6. Child welfare caseworkers as service brokers for youth in foster care: findings from project focus.

    Science.gov (United States)

    Dorsey, Shannon; Kerns, Suzanne E U; Trupin, Eric W; Conover, Kate L; Berliner, Lucy

    2012-02-01

    Youth in the foster care system have substantially higher rates of mental health needs compared to the general population, yet they rarely receive targeted, evidence-based practices (EBPs). Increasingly emerging in the literature on mental health services is the importance of "brokers" or "gateway providers" of services. For youth in foster care, child welfare caseworkers often play this role. This study examines caseworker-level outcomes of Project Focus, a caseworker training and consultation model designed to improve emotional and behavioral outcomes for youth in foster care through increased linkages with EBPs. Project Focus was tested through a small, randomized trial involving four child welfare offices. Caseworkers in the Project Focus intervention group demonstrated an increased awareness of EBPs and a trend toward increased ability to identify appropriate EBP referrals for particular mental health problems but did not have significantly different rates of actual referral to EBPs. Dose of consultation was associated with general awareness of EBPs. Implications for practice and outcomes for youth are discussed.

  7. Turbine and Structural Seals Team Facilities

    Data.gov (United States)

    Federal Laboratory Consortium — Seals Team Facilities conceive, develop, and test advanced turbine seal concepts to increase efficiency and durability of turbine engines. Current projects include...

  8. A Computer Supported Teamwork Project for People with a Visual Impairment.

    Science.gov (United States)

    Hale, Greg

    2000-01-01

    Discussion of the use of computer supported teamwork (CSTW) in team-based organizations focuses on problems that visually impaired people have reading graphical user interface software via screen reader software. Describes a project that successfully used email for CSTW, and suggests issues needing further research. (LRW)

  9. Teams and teamwork at NASA Langley Research Center

    Science.gov (United States)

    Dickinson, Terry L.

    1994-01-01

    The recent reorganization and shift to managing total quality at the NASA Langley Research Center (LaRC) has placed an increasing emphasis on teams and teamwork in accomplishing day-to-day work activities and long-term projects. The purpose of this research was to review the nature of teams and teamwork at LaRC. Models of team performance and teamwork guided the gathering of information. Current and former team members served as participants; their collective experience reflected membership in over 200 teams at LaRC. The participants responded to a survey of open-ended questions which assessed various aspects of teams and teamwork. The participants also met in a workshop to clarify and elaborate on their responses. The work accomplished by the teams ranged from high-level managerial decision making (e.g., developing plans for LaRC reorganization) to creating scientific proposals (e.g., describing spaceflight projects to be designed, sold, and built). Teams typically had nine members who remained together for six months. Member turnover was around 20 percent; this turnover was attributed to heavy loads of other work assignments and little formal recognition and reward for team membership. Team members usually shared a common and valued goal, but there was not a clear standard (except delivery of a document) for knowing when the goal was achieved. However, members viewed their teams as successful. A major factor in team success was the setting of explicit a priori rules for communication. Task interdependencies between members were not complex (e.g., sharing of meeting notes and ideas about issues), except between members of scientific teams (i.e., reliance on the expertise of others). Thus, coordination of activities usually involved scheduling and attendance of team meetings. The team leader was designated by the team's sponsor. This leader usually shared power and responsibilities with other members, such that team members established their own operating

  10. CY15 Livermore Computing Focus Areas

    Energy Technology Data Exchange (ETDEWEB)

    Connell, Tom M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Cupps, Kim C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); D' Hooge, Trent E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fahey, Tim J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fox, Dave M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Futral, Scott W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Gary, Mark R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Goldstone, Robin J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hamilton, Pam G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Heer, Todd M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Long, Jeff W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Mark, Rich J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Morrone, Chris J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Shoopman, Jerry D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Slavec, Joe A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Smith, David W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Springmeyer, Becky R [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Stearman, Marc D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Watson, Py C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-01-20

    The LC team undertook a survey of primary Center drivers for CY15. Identified key drivers included enhancing user experience and productivity, pre-exascale platform preparation, process improvement, data-centric computing paradigms and business expansion. The team organized critical supporting efforts into three cross-cutting focus areas; Improving Service Quality; Monitoring, Automation, Delegation and Center Efficiency; and Next Generation Compute and Data Environments In each area the team detailed high level challenges and identified discrete actions to address these issues during the calendar year. Identifying the Center’s primary drivers, issues, and plans is intended to serve as a lens focusing LC personnel, resources, and priorities throughout the year.

  11. Team-Based Professional Development Interventions in Higher Education: A Systematic Review.

    Science.gov (United States)

    Gast, Inken; Schildkamp, Kim; van der Veen, Jan T

    2017-08-01

    Most professional development activities focus on individual teachers, such as mentoring or the use of portfolios. However, new developments in higher education require teachers to work together in teams more often. Due to these changes, there is a growing need for professional development activities focusing on teams. Therefore, this review study was conducted to provide an overview of what is known about professional development in teams in the context of higher education. A total of 18 articles were reviewed that describe the effects of professional development in teams on teacher attitudes and teacher learning. Furthermore, several factors that can either hinder or support professional development in teams are identified at the individual teacher level, at the team level, and also at the organizational level.

  12. Solar thermal power systems point-focusing thermal and electric applications projects. Volume 1: Executive summary

    Science.gov (United States)

    Marriott, A.

    1980-01-01

    The activities of the Point-Focusing Thermal and Electric Applications (PETEA) project for the fiscal year 1979 are summarized. The main thrust of the PFTEA Project, the small community solar thermal power experiment, was completed. Concept definition studies included a small central receiver approach, a point-focusing distributed receiver system with central power generation, and a point-focusing distributed receiver concept with distributed power generation. The first experiment in the Isolated Application Series was initiated. Planning for the third engineering experiment series, which addresses the industrial market sector, was also initiated. In addition to the experiment-related activities, several contracts to industry were let and studies were conducted to explore the market potential for point-focusing distributed receiver (PFDR) systems. System analysis studies were completed that looked at PFDR technology relative to other small power system technology candidates for the utility market sector.

  13. Team Organization Method Using Salary Auction Game for Sustainable Motivation

    Directory of Open Access Journals (Sweden)

    Sangkyun Kim

    2015-10-01

    Full Text Available In performing team-based projects in engineering class, students usually face many problems, such as free-riding, lack of responsibility, boredom, and insufficient initiative. This papers proposes a new method for performing team-based projects in engineering class—specifically, a gamified method for team organization using a salary auction game. On the description of the design and use of a salary auction game in engineering class, a case study conducted using a survey method is reported to validate the practical value of the proposed auction game. The salary auction game proposed in this paper demonstrates that a gamified team organization method in engineering class could be used as an effective tool to enhance motivation and to improve learning outcomes of engineering students.

  14. Are real teams healthy teams?

    NARCIS (Netherlands)

    Buljac, M.; van Woerkom, M.; van Wijngaarden, P.

    2013-01-01

    This study examines the impact of real-team--as opposed to a team in name only--characteristics (i.e., team boundaries, stability of membership, and task interdependence) on team processes (i.e., team learning and emotional support) and team effectiveness in the long-term care sector. We employed a

  15. The return map: tracking product teams.

    Science.gov (United States)

    House, C H; Price, R L

    1991-01-01

    With a new product, time is now more valuable than money. The costs of conceiving and designing a product are less important to its ultimate success than timeliness to market. One of the most important ways to speed up product development is through interfunctional teamwork. The "Return Map," developed at Hewlett-Packard, provides a way for people from different functions to triangulate on the product development process as a whole. It graphically represents the contributions of all team members to the moment when a project breaks even. It forces the team to estimate and re-estimate the time it will take to perform critical tasks, so that products can get out fast. It subjects the team to the only discipline that works, namely, self-discipline. The map is, in effect, a graph representing time and money, where the time line is divided into three phases: investigation, development, and manufacturing and sales. Meanwhile, costs are plotted against time--as are revenues when they are realized after manufacturing release. Within these points of reference, four novel metrics emerge: Break-Even-Time, Time-to-Market, Break-Even-After-Release, and the Return Factor. All metrics are estimated at the beginning of a project to determine its feasibility, then they are tracked carefully while the project evolves to determine its success. Missed forecasts are inevitable, but managers who punish employees for missing their marks will only encourage them to estimate conservatively, thus building slack into a system meant to eliminate slack. Estimates are a team responsibility, and deviations provide valuable information that spurs continuous investigation and improvement.

  16. The Use of ICT Platforms to Promote Knowledge Exchange in Project-Based Organisations

    Directory of Open Access Journals (Sweden)

    Priyono Anjar

    2016-12-01

    Full Text Available This study aims to investigate the use of information and communication technology (ICT to support knowledge exchange in project-based organisations. The primary ICT tool investigated in this research is WhatsApp, a messaging application that has been widely used since its introduction. An ethnographic case study method was utilised to analyse qualitative data collected from interviews and focus group discussions. Three projects in an Indonesian university with a duration ranging from 8 months to 2 years were examined as object of investigations. Broadly, the findings show that ICT tools are generally useful in supporting knowledge exchange, which ultimately positively affects project performance. The project teams relied on WhatsApp for the success of the projects. Although face-to-face meetings were rare, team communication was highly intensive, supported by WhatsApp. In addition, managers are encouraged to promote knowledge exchange between team members. Through knowledge exchange, there will be knowledge development, which facilitates the invention of new techniques and methods for promoting project success. The most prominent findings are presented using direct quotations to provide first hand insight from the field. At the end of the paper, recommendations regarding what project managers should do during and after the project has been completed are presented. The recommendations are classified based on the knowledge management life cycle, representing a structured method to manage knowledge in project-based organisations.

  17. Team Learning in Teacher Teams: Team Entitativity as a Bridge between Teams-in-Theory and Teams-in-Practice

    Science.gov (United States)

    Vangrieken, Katrien; Dochy, Filip; Raes, Elisabeth

    2016-01-01

    This study aimed to investigate team learning in the context of teacher teams in higher vocational education. As teacher teams often do not meet all criteria included in theoretical team definitions, the construct "team entitativity" was introduced. Defined as the degree to which a group of individuals possesses the quality of being a…

  18. Project time boxing and milestones as drivers for open design projects

    DEFF Research Database (Denmark)

    Tollestrup, Christian H. T.

    2015-01-01

    is very positive and that the structure, strict enforcement and rolling project management responsibility in a group work setting really helps them drive the project forward with high motivation. The main challenge lies in the balance between loading the teams with too many challenges and just providing......The Curriculums and programs in Problem Based Learning (PBL) utilizes the project-format in a team based setting for rehearsing the competencies of applying the design-oriented skills and knowledge learned in courses and workshops. If the project period is self-organised, there is a tendency......, because of the facilitated format where ‘disturbances’ are eliminated. If successful the state of creative flow is achieved. So how can we create a sense of urgency in longer project periods, not just workshop format, that would help a team of design students to engage and drive the project from the start...

  19. Governing highly performing lean team behaviors : A mixed-methods longitudinal study

    NARCIS (Netherlands)

    Van Dun, Desirée H.; Wilderom, Celeste P.M.

    2015-01-01

    Work teams go through multiple performance cycles; initially highly performing teams may experience a decline in subsequent performance and vice-versa. This inductive study focuses on team-behavioral and contextual predictors of high lean team performance. Rooted in both the IMOI model and reviewing

  20. Team Leader Structuring for Team Effectiveness and Team Learning in Command-and-Control Teams.

    Science.gov (United States)

    van der Haar, Selma; Koeslag-Kreunen, Mieke; Euwe, Eline; Segers, Mien

    2017-04-01

    Due to their crucial and highly consequential task, it is of utmost importance to understand the levers leading to effectiveness of multidisciplinary emergency management command-and-control (EMCC) teams. We argue that the formal EMCC team leader needs to initiate structure in the team meetings to support organizing the work as well as facilitate team learning, especially the team learning process of constructive conflict. In a sample of 17 EMCC teams performing a realistic EMCC exercise, including one or two team meetings (28 in sum), we coded the team leader's verbal structuring behaviors (1,704 events), rated constructive conflict by external experts, and rated team effectiveness by field experts. Results show that leaders of effective teams use structuring behaviors more often (except asking procedural questions) but decreasingly over time. They support constructive conflict by clarifying and by making summaries that conclude in a command or decision in a decreasing frequency over time.

  1. Team Leader Structuring for Team Effectiveness and Team Learning in Command-and-Control Teams

    Science.gov (United States)

    van der Haar, Selma; Koeslag-Kreunen, Mieke; Euwe, Eline; Segers, Mien

    2017-01-01

    Due to their crucial and highly consequential task, it is of utmost importance to understand the levers leading to effectiveness of multidisciplinary emergency management command-and-control (EMCC) teams. We argue that the formal EMCC team leader needs to initiate structure in the team meetings to support organizing the work as well as facilitate team learning, especially the team learning process of constructive conflict. In a sample of 17 EMCC teams performing a realistic EMCC exercise, including one or two team meetings (28 in sum), we coded the team leader’s verbal structuring behaviors (1,704 events), rated constructive conflict by external experts, and rated team effectiveness by field experts. Results show that leaders of effective teams use structuring behaviors more often (except asking procedural questions) but decreasingly over time. They support constructive conflict by clarifying and by making summaries that conclude in a command or decision in a decreasing frequency over time. PMID:28490856

  2. ARPA-E Impacts: A Sampling of Project Outcomes, Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Rohlfing, Eric [Dept. of Energy (DOE), Washington DC (United States). Advanced Research Projects Agency-Energy (ARPA-E)

    2017-02-27

    The Advanced Research Projects Agency-Energy (ARPA-E) is demonstrating that a collaborative model has the power to deliver real value. The Agency’s first compilation booklet of impact sheets, published in 2016, began to tell the story of how ARPA-E has already made an impact in just seven years—funding a diverse and sophisticated research portfolio on advanced energy technologies that enable the United States to tackle our most pressing energy challenges. One year later our research investments continue to pay off, with a number of current and alumni project teams successfully commercializing their technologies and advancing the state of the art in transformative areas of energy science and engineering. There is no single measure that can fully illustrate ARPA-E’s success to date, but several statistics viewed collectively begin to reveal the Agency’s impact. Since 2009, ARPA-E has provided more than $1.5 billion in funding for 36 focused programs and three open funding solicitations, totaling over 580 projects. Of those, 263 are now alumni projects. Many teams have successfully leveraged ARPA-E’s investment: 56 have formed new companies, 68 have partnered with other government agencies to continue their technology development, and 74 teams have together raised more than $1.8 billion in reported funding from the private sector to bring their technologies to market. However, even when viewed together, those measures do not capture ARPA-E’s full impact. To best understand the Agency’s success, the specific scientific and engineering challenges that ARPA-E project teams have overcome must be understood. This booklet provides concrete examples of those successes, ranging from innovations that will bear fruit in the future to ones that are beginning to penetrate the market as products today. Importantly, half of the projects highlighted in this volume stem from OPEN solicitations, which the agency has run in 2009, 2012, and 2015. ARPA-E’s OPEN programs

  3. Leading teaming: Evidence from Jazz

    OpenAIRE

    Araújo, Francisco Maria Trigo da Roza Carvalho

    2013-01-01

    A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics In this research we conducted qualitative analysis to study the team dynamics of jazz combos in order to explore deeper the leadership behaviors in a creative environment where teaming occurs. We found evidence of a dual leader, one that shifts his/her role between ‘leader as leader’ and ‘leader as member’, embracing both leaderfulness an...

  4. Reflections on shifts in the work identity of research team members

    Directory of Open Access Journals (Sweden)

    Rina A. Smith

    2015-06-01

    Full Text Available Orientation: This study explores shifts in the work identity of individual members of a research team. Research purpose: The aim of the study is to explore shifts in work identity experienced by individual research team members during a project wherein they were studying work identity themselves. Motivation for the study: This study seized the opportunity to do research on the shifts in work identify experienced by researchers whilst they were studying work identify as part of the South African–Netherlands Project for Alternatives in Development. This allowed the researcher the rather novel opportunity of conducting research on researchers and resulted in the project as a whole occurring at a dual level of analysis. Research approach, design and method: Using thematic analysis methodology in the context of qualitative field research, 10 semi-structured interviews were conducted with five participants, all of them part of the research team who were themselves involved in conducting research on work identity. The sixth member of the research team, who is also one of the authors of this article, presented data related to shifts in her own work identity in her dissertation as an autoethnographic account. For purposes of this article, she is referred to as Participant 6. Given the multiple research team members, each one of whom constituted an individual case, the researcher made use of a multiple case study approach whilst focusing on the intrinsic case. The holistic nature of description found in the case study involved every aspect of the lives of the research team members. Analysis was done by means of content analysis. Main findings: In exploring the shifts in work identity experienced by individual research team members, it was discovered that finding meaning and purpose in the professional activities participants engaged in was of critical importance. Contextual realities and the way in which individuals approached the possibility of shifts

  5. Multidisciplinary team functioning.

    Science.gov (United States)

    Kovitz, K E; Dougan, P; Riese, R; Brummitt, J R

    1984-01-01

    This paper advocates the need to move beyond interdisciplinary team composition as a minimum criterion for multidisciplinary functioning in child abuse treatment. Recent developments within the field reflect the practice of shared professional responsibility for detection, case management and treatment. Adherence to this particular model for intervention requires cooperative service planning and implementation as task related functions. Implicitly, this model also carries the potential to incorporate the supportive functioning essential to effective group process. However, explicit attention to the dynamics and process of small groups has been neglected in prescriptive accounts of multidisciplinary child abuse team organization. The present paper therefore focuses upon the maintenance and enhancement aspects of multidisciplinary group functioning. First, the development and philosophy of service for the Alberta Children's Hospital Child Abuse Program are reviewed. Second, composition of the team, it's mandate for service, and the population it serves are briefly described. Third, the conceptual framework within which the program functions is outlined. Strategies for effective group functioning are presented and the difficulties encountered with this model are highlighted. Finally, recommendations are offered for planning and implementing a multidisciplinary child abuse team and for maintaining its effective group functioning.

  6. Diving and Environmental Simulation Team

    Data.gov (United States)

    Federal Laboratory Consortium — The Diving and Environmental Simulation Team focuses on ways to optimize the performance and safety of Navy divers. Our goal is to increase mission effectiveness by...

  7. Toward a User Driven Innovation for Distributed Software Teams

    Science.gov (United States)

    Hossain, Liaquat; Zhou, David

    The software industry has emerged to include some of the most revolutionized distributed work groups; however, not all such groups achieve their set goals and some even fail miserably. The distributed nature of open source software project teams provides an intriguing context for the study of distributed coordination. OSS team structures have traditionally been geographically dispersed and, therefore, the coordination of post-release activities such as testing are made difficult due to the fact that the only means of communication is via electronic forms, such as e-mail or message boards and forums. Nevertheless, large scale, complex, and innovative software packages have been the fruits of labor for some OSS teams set in such coordination-unfriendly environments, while others end in flames. Why are some distributed work groups more effective than others? In our current communication-enriched environment, best practices for coordination are adopted by all software projects yet some still fall by the wayside. Does the team structure have bearing on the success of the project? How does the communication between the team and external parties affect the project's ultimate success or failure? In this study, we seek to answer these questions by applying existing theories from social networks and their analytical methods in the coordination of defect management activities found in OSS projects. We propose the social network based theoretical model for exploring distributed coordination structures and apply that for the case of the OSS defect management process for exploring the structural properties, which induce the greatest coordination performance. The outcome suggests that there is correlation between certain network measures such as density, centrality, and betweenness and coordination performance measures of defect management systems such as quality and timeliness.

  8. Exploration of Team Integration in Spanish Multifamily Residential Building Construction

    OpenAIRE

    Pellicer, Eugenio; Sanz Benlloch, María Amalia; Esmaeili, B.; MOLENAAR, KEITH ROBERT

    2016-01-01

    Project delivery team integration generally involves early involvement of general contractors and key specialty contractors in the design process. Team integration has been found to improve an owner’s probability of success. However, during difficult economic times, owners can forego early team involvement and move toward low bid procurement to take advantage of competitive markets. This study explores the performance of integrated teams in the Spanish multifamily building constructi...

  9. Path to 'Stardom' in Globally Distributed Hybrid Teams

    DEFF Research Database (Denmark)

    Sarker, Suprateek; Hove-Kirkeby, Sarah; Sarker, Saonee

    2011-01-01

    recognition that specific individuals within such teams are often critical to the team's performance. Consequently, existing knowledge about such teams may be enhanced by examining the factors that affect the performance of individual team members. This study attempts to address this need by identifying...... individuals who emerge as “stars” in globally distributed teams involved in knowledge work such as information systems development (ISD). Specifically, the study takes a knowledge-centered view in explaining which factors lead to “stardom” in such teams. Further, it adopts a social network approach consistent......Although distributed teams have been researched extensively in information systems and decision science disciplines, a review of the literature suggests that the dominant focus has been on understanding the factors affecting performance at the team level. There has however been an increasing...

  10. Missouri Agricultural Energy Saving Team-A Revolutionary Opportunity (MAESTRO)

    Energy Technology Data Exchange (ETDEWEB)

    McIntosh, Jane [MDA; Schumacher, Leon [University of Missouri

    2014-10-23

    The Missouri Agricultural Energy Saving Team-A Revolutionary Opportunity (MAESTRO) program brought together a team of representatives from government, academia, and private industry to enhance the availability of energy efficiency services for small livestock producers in the State of Missouri. The Missouri Department of Agriculture (MDA) managed the project via a subcontract with the University of Missouri (MU), College of Agriculture Food and Natural Resources, MU Extension, the MU College of Human Environmental Sciences, the MU College of Engineering, and the Missouri Agricultural and Small Business Development Authority (MASBDA). MU teamed with EnSave, Inc, a nationally-recognized expert in agricultural energy efficiency to assist with marketing, outreach, provision of farm energy audits and customer service. MU also teamed with independent home contractors to facilitate energy audits of the farm buildings and homes of these livestock producers. The goals of the project were to: (1) improve the environment by reducing fossil fuel emissions and reducing the total energy used on small animal farms; (2) stimulate the economy of local and regional communities by creating or retaining jobs; and (3) improve the profitability of Missouri livestock producers by reducing their energy expenditures. Historically, Missouri scientists/engineers conducted programs on energy use in agriculture, such as in equipment, grain handling and tillage practices. The MAESTRO program was the first to focus strictly on energy efficiency associated with livestock production systems in Missouri and to investigate the applicability and potential of addressing energy efficiency in animal production from a building efficiency perspective. A. Project Objectives The goal of the MAESTRO program was to strengthen the financial viability and environmental soundness of Missouri's small animal farms by helping them implement energy efficient technologies for the production facility, farm

  11. Factors influencing mine rescue team behaviors.

    Science.gov (United States)

    Jansky, Jacqueline H; Kowalski-Trakofler, K M; Brnich, M J; Vaught, C

    2016-01-01

    A focus group study of the first moments in an underground mine emergency response was conducted by the National Institute for Occupational Safety and Health (NIOSH), Office for Mine Safety and Health Research. Participants in the study included mine rescue team members, team trainers, mine officials, state mining personnel, and individual mine managers. A subset of the data consists of responses from participants with mine rescue backgrounds. These responses were noticeably different from those given by on-site emergency personnel who were at the mine and involved with decisions made during the first moments of an event. As a result, mine rescue team behavior data were separated in the analysis and are reported in this article. By considering the responses from mine rescue team members and trainers, it was possible to sort the data and identify seven key areas of importance to them. On the basis of the responses from the focus group participants with a mine rescue background, the authors concluded that accurate and complete information and a unity of purpose among all command center personnel are two of the key conditions needed for an effective mine rescue operation.

  12. Learning Together and Working Apart: Routines for Organizational Learning in Virtual Teams

    Science.gov (United States)

    Dixon, Nancy

    2017-01-01

    Purpose: Research suggests that teaming routines facilitate learning in teams. This paper identifies and details how specific teaming routines, implemented in a virtual team, support its continual learning. The study's focus was to generate authentic and descriptive accounts of the interviewees' experiences with virtual teaming routines.…

  13. Citizen Sky, An Update on the AAVSO's New Citizen Science Project

    Science.gov (United States)

    Turner, Rebecca; Price, A.; Henden, A.; Stencel, R.; Kloppenborg, B.

    2011-01-01

    Citizen Sky is a multi-year, NSF-funded, citizen science project focusing on the bright variable star, epsilon Aurigae. Citizen Sky goes beyond simple observing to include a major data analysis component. The goal is to introduce the participant to the full scientific process from background research to paper writing for a peer-reviewed journal. The first year of the project, 2009-10, was dedicated to developing project infrastructure, educating participants about epsilon Aurigae, and training these participants to observe the star and report their data. Looking forward, years two and three of the project will focus on assembling teams of participants to work on their own analysis and research. Results will be published in a special issue of the peer-reviewed Journal of the AAVSO. This project has been made possible by the National Science Foundation.

  14. The use of a rehabilitation team for stroke patients.

    Science.gov (United States)

    Pendarvis, J F; Grinnell, R M

    1980-01-01

    A multidisciplinary team affiliated with a large urban hospital is described and evaluated with respect to its effects on stroke patients. Twenty-six patients who had been referred to the team in a 7-month period were compared with a group of 32 patients who had not been referred to the team. Patients were evaluated on the basis of their scores on a functional health scale mailed to them 3 months after their discharge from the hospital. The results of this project indicate that patients seen by the team scored higher on functional health than those not seen by the team.

  15. U.S. China Carbon Capture and Storage Development Project at West Virginia University

    Energy Technology Data Exchange (ETDEWEB)

    Fletcher, Jerald

    2013-12-31

    The original overall objective of this activity was to undertake resource evaluation and planning for CCS projects and to describe and quantify the geologic, environmental, and economic challenges to successful development of large-scale CCS in China’s coal sector. Several project execution barriers were encountered in the course of this project, most notably a project stop/delay due to funds availability/costing restrictions from the US State Department to the US Department of Energy at the end of CY2012, which halted project execution from January 2, 2013 to April 1, 2013. At the resolution of this project delay, it was communicated to the project team that the overall project period would also be reduced, from a completion date of February 28, 2014 to December 31, 2013. The net impact of all these changes was a reduction in the project period from 24 months (3/1/2012-2/28/2014) to 22 months (3/1/2012-12/31/2013), with a 3 month stop from 1/1/2013-3/31/2013. The project team endeavored to overcome these project time impacts, focusing heavily on technoeconomic modeling that would be deliverable under Task 3 (Ordos Basin Feasibility Study), and choosing to abandon the full investigation into the Demonstration Site (Task 4) due to the reduced project time. The ultimate focus of this project changed to work with the Chinese on a carbon atlas/geologic characterization, and on mechanisms for CO2 storage options from high-quality streams within China.

  16. A dynamical approach toward understanding mechanisms of team science: change, kinship, tension, and heritage in a transdisciplinary team.

    Science.gov (United States)

    Lotrecchiano, Gaetano R

    2013-08-01

    Since the concept of team science gained recognition among biomedical researchers, social scientists have been challenged with investigating evidence of team mechanisms and functional dynamics within transdisciplinary teams. Identification of these mechanisms has lacked substantial research using grounded theory models to adequately describe their dynamical qualities. Research trends continue to favor the measurement of teams by isolating occurrences of production over relational mechanistic team tendencies. This study uses a social constructionist-grounded multilevel mixed methods approach to identify social dynamics and mechanisms within a transdisciplinary team. A National Institutes of Health-funded research team served as a sample. Data from observations, interviews, and focus groups were qualitatively coded to generate micro/meso level analyses. Social mechanisms operative within this biomedical scientific team were identified. Dynamics that support such mechanisms were documented and explored. Through theoretical and emergent coding, four social mechanisms dominated in the analysis-change, kinship, tension, and heritage. Each contains relational social dynamics. This micro/meso level study suggests such mechanisms and dynamics are key features of team science and as such can inform problems of integration, praxis, and engagement in teams. © 2013 Wiley Periodicals, Inc.

  17. Building a team through a strategic planning process.

    Science.gov (United States)

    Albert, Debra; Priganc, Dave

    2014-01-01

    Strategic planning is a process often left to senior hospital leadership, with limited input from unit-level, bedside patient care providers. This frequent approach to strategic planning misses the opportunity to engage a wide range of employees, build a shared sense of commitment, produce a collaborative team environment, and to generate greater acceptance of the plan. The Patient Care Services division at the University of Chicago Medicine used a strategic planning process that incorporated 360-degree input from both within the Patient Care Services division and outside of the division. The result is a strategic vision and plan that, shaped by broad-based input from both internal and external constituencies, is strengthened by the team that emerged from the process. Through the process of identifying a common understanding of the group's future direction, a shared purpose was created that transcended traditional professional boundaries and shaped a cohesive team focused on effective and efficient patient care. Now, with a focused strategic plan and a team centered on a shared purpose, the team is beginning to effectively deliver on the plan.

  18. Do Teachers Misbehave? Aggression in School Teams

    Science.gov (United States)

    Ben Sasson, Dvora; Somech, Anit

    2015-01-01

    Purpose: Despite growing research on school aggression, significant gaps remain in the authors' knowledge of team aggression, since most studies have mainly explored aggression on the part of students. The purpose of this paper is to focus on understanding the phenomenon of workplace aggression in school teams. Specifically, the purpose of the…

  19. A project-based geoscience curriculum: select examples

    Science.gov (United States)

    Brown, L. M.; Kelso, P. R.; White, R. J.; Rexroad, C. B.

    2007-12-01

    Principles of constructivist educational philosophy serve as a foundation for the recently completed National Science Foundation sponsored undergraduate curricular revision undertaken by the Geology Department of Lake Superior State University. We integrate lecture and laboratory sessions utilizing active learning strategies that focus on real-world geoscience experiences and problems. In this presentation, we discuss details of three research-like projects that require students to access original data, process and model the data using appropriate geological software, interpret and defend results, and disseminate results in reports, posters, and class presentations. The projects are from three upper division courses, Carbonate Systems, Sequence Stratigraphy, and Geophysical Systems, where teams of two to four students are presented with defined problems of durations ranging from a few weeks to an entire semester. Project goals and location, some background information, and specified dates and expectations for interim and final written and oral reports are provided to students. Some projects require the entire class to work on one data set, some require each team to be initially responsible for a portion of the project with teams ultimately merging data for interpretation and to arrive at final conclusions. Some projects require students to utilize data from appropriate geological web sites such as state geological surveys. Others require students to design surveys and utilize appropriate instruments of their choice for field data collection. Students learn usage and applications of appropriate geological software in compiling, processing, modeling, and interpreting data and preparing formal reports and presentations. Students uniformly report heightened interest and motivation when engaged in these projects. Our new curriculum has resulted in an increase in students" quantitative and interpretive skills along with dramatic improvement in communication and

  20. Making Sense of Conflict in Distributed Teams: A Design Science Approach

    Science.gov (United States)

    Zhang, Guangxuan

    2016-01-01

    Conflict is a substantial, pervasive activity in team collaboration. It may arise because of differences in goals, differences in ways of working, or interpersonal dissonance. The specific focus for this research is the conflict in distributed teams. As opposed to traditional teams, participants of distributed teams are geographically dispersed…

  1. Investigating the effects of time pressure on new product development teams

    NARCIS (Netherlands)

    Chong, D.S.F.

    2010-01-01

    The need for innovation has led high-technology organizations to use project teams as the method of choice to bring new products to market under demanding schedules. Adopting a team approach, however, is not always fruitful and often depends on whether team members can work effectively together.

  2. Investigating the extent to which mobile phones reduce Knowledge Transfer barriers in Student Project Teams

    Directory of Open Access Journals (Sweden)

    Michael E. Kyobe

    2011-10-01

    Institutions of learning are increasingly adopting information and communication technologies (e.g. mobile technologies to provide solutions to the challenges facing them. Whilst the integration of the mobile context and technologies in learning environment has been encouraged over the years, and indeed many students today can use mobile phones, the effectiveness of these technologies in reducing impediments to knowledge transfer in group learning has not been investigated. This study investigated the extent to which mobile phones reduce the barriers to knowledge transfer in project groups. The impediments examined include the nature of knowledge, social barriers, lack of time and lack of motivation. Quantitative and qualitative approaches were used to collect and analyse the data. The sample consisted of 85 students engaged in group projects in the departments of Information Systems, Civil Engineering, Computer Science and Construction Engineering. The results show that mobile phones reduce all four knowledge transfer barriers investigated in the project groups. We found no significant difference in the nature of knowledge shared by teams with weak and strong ties. This suggests that teams with weak social ties who normally experience difficulty sharing complex (tacit knowledge can easily do so with the aid of mobile facilities. In addition, frequent users of mobile phones were motivated to share explicit knowledge with their peers whilst those who often work with tacit knowledge could convert it to explicit form and share it with others. Mobile features like short messaging service and multimedia messaging service (SMS & MMS or what some people refer to as ‘texting’, and email were mainly used to share knowledge and were perceived to reduce knowledge transfer time more than voice facilities. Our findings indicate that most students do not utilise the affordances of mobile phones for tacit knowledge transfer. Sharing of tacit knowledge needs to be encouraged

  3. Professional Team Foundation Server 2012

    CERN Document Server

    Blankenship, Ed; Holliday, Grant; Keller, Brian

    2012-01-01

    A comprehensive guide to using Microsoft Team Foundation Server 2012 Team Foundation Server has become the leading Microsoft productivity tool for software management, and this book covers what developers need to know to use it effectively. Fully revised for the new features of TFS 2012, it provides developers and software project managers with step-by-step instructions and even assists those who are studying for the TFS 2012 certification exam. You'll find a broad overview of TFS, thorough coverage of core functions, a look at extensibility options, and more, written by Microsoft ins

  4. Telecommunication Technologies for Smart Grid Projects with Focus on Smart Metering Applications

    Directory of Open Access Journals (Sweden)

    Nikoleta Andreadou

    2016-05-01

    Full Text Available This paper provides a study of the smart grid projects realised in Europe and presents their technological solutions with a focus on smart metering Low Voltage (LV applications. Special attention is given to the telecommunications technologies used. For this purpose, we present the telecommunication technologies chosen by several European utilities for the accomplishment of their smart meter national roll-outs. Further on, a study is performed based on the European Smart Grid Projects, highlighting their technological options. The range of the projects analysed covers the ones including smart metering implementation as well as those in which smart metering applications play a significant role in the overall project success. The survey reveals that various topics are directly or indirectly linked to smart metering applications, like smart home/building, energy management, grid monitoring and integration of Renewable Energy Sources (RES. Therefore, the technological options that lie behind such projects are pointed out. For reasons of completeness, we also present the main characteristics of the telecommunication technologies that are found to be used in practice for the LV grid.

  5. What constitutes meaningful engagement for patients and families as partners on research teams?

    Science.gov (United States)

    Black, Agnes; Strain, Kimberly; Wallsworth, Christine; Charlton, Sara-Grey; Chang, Wilma; McNamee, Kate; Hamilton, Clayon

    2018-01-01

    Objective There is growing emphasis on health care organizations to ensure that lay people are meaningfully engaged as partners on research teams. Our aim was to explore the perspectives of patients, family members and informal caregivers who have been involved on health care research teams in Canada and elicit their recommendations for meaningful engagement. Methods We conducted a qualitative study guided by thematic analysis of transcripts of focus groups and interviews of 19 experienced patient research partners in Canada. Results We identified four main themes: research environment, expectations, support and value, which highlight participants' combined perspectives on important factors to ensure their engagement in research is meaningful. Conclusions Our findings add to the evolving evidence base on the perspectives of lay people involved in health care research and their recommendations for research leaders on meaningful engagement. Our study suggests that research leaders should provide a welcoming research environment, outline appropriate expectations for patient research partners on research teams, support patient research partners' engagement in projects and recognize the value patient research partners bring to health research.

  6. The communication in industrialised building system (IBS) construction project: Virtual environment

    Science.gov (United States)

    Pozin, Mohd Affendi Ahmad; Nawi, Mohd Nasrun Mohd

    2017-10-01

    Large portion of numbers team organization in the IBS construction sector is known are being fragmented. That is contributed from a segregation of construction activity thus create team working in virtually. Virtual team are the nature when teams are working in distributed area, across culture and time. Therefore, teams can be respond to the task without relocating to the site project and settle down a problem through information and communication technology (ICT). The emergence of virtual team are carry out by advancements in communication technologies as a medium to improve project team communication in project delivery process on IBS construction. Based on literature review from previous study and data collected from interviewing, this paper aim to identified communication challenges among project team members according to current project development practices in IBS construction project. Hence, in attempt to develop effective communication through the advantages of virtual team approach for IBS construction project. In order to ensure the data is gathered comprehensively and accurately, the data was collected from project managers by using semi structured interview method. It was found that virtual team approach could be enable competitive challenges on complexity in the construction project management process.

  7. Strengths, weaknesses, opportunities and threats of virtual team in Nigerian construction industry

    Directory of Open Access Journals (Sweden)

    Odubiyi Tawakalitu Bisola

    2016-12-01

    Full Text Available The rationale behind any construction project varies; it might be to achieve value, time, quality, cost or just satisfaction for the client. Irrespective of any or all of these reasons, the team members involved in conception, inception, construction and delivery of a project are aware that a good teamwork is of essence. This is in the context of growing needs of client and the ever-growing improvement in methods of project delivery as influenced by technology. This article looks into the team type in the Nigerian construction industry from the angle of a virtual team (VT using the mixed-method research design. VT is simply a type of team wherein the members operate from different geographical regions and function majorly with the aid of information and communications technology media. Data for the study were collected from relevant literature, interviews were conducted with 20 selected professionals in the construction industry and, thereafter, a questionnaire was drafted from the results of the interviews and administered to selected relevant professionals. The study revealed that communication among team members, flexibility of operation and decision making are usually the most influencing strengths of the VT, while some of its weaknesses are a need for special training, conflict among team members and client’s acceptance of team type. Reduction in time-to-market, collaboration ability of team members and delivery time of project were seen as opportunities, while recognized threats were members’ performance level and complexity of technical application. The study concludes that the success of the VT depends highly on exploiting the opportunities opened to it.

  8. Space Focus Lead Report

    Energy Technology Data Exchange (ETDEWEB)

    Reeves, Geoffrey D. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-08-10

    The Space Focus team is tasked with the definition of the Space Focused Science Topics, and with the review and ranking of the CSES proposals received in all the program areas. This is achieved by dedicated meetings or a series of informal discussions and/or e-mail reviews.

  9. Intelligent Virtual Assistant's Impact on Technical Proficiency within Virtual Teams

    Science.gov (United States)

    Graham, Christian; Jones, Nory B.

    2016-01-01

    Information-systems development continues to be a difficult process, particularly for virtual teams that do not have the luxury of meeting face-to-face. The research literature on this topic reinforces this point: the greater part of database systems development projects ends in failure. The use of virtual teams to complete projects further…

  10. Program Development Plan and Team up

    Energy Technology Data Exchange (ETDEWEB)

    Solar Electric Power Association

    2001-12-01

    The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead.

  11. Task and person-focused leadership behaviors and team performance : A meta-analysis

    NARCIS (Netherlands)

    Ceri-Booms, Meltem; Curseu, P.L.; Oerlemans, L.A.G.

    2017-01-01

    This paper reports the results of a meta-analytic review of the relationship between person and task oriented leader behaviors, on the one hand, and team performance, on the other hand. The results, based on 89 independent samples, show a moderate positive (ρ=.33) association between both types of

  12. ERATOSTHENES: excellence research Centre for Earth surveillance and space-based monitoring of the environment, the EXCELSIOR Horizon 2020 teaming project

    Science.gov (United States)

    Hadjimitsis, Diofantos G.; Kontoes, Haris; Schreier, Gunter; Ansmann, Albert; Komodromos, George; Themistocleous, Kyriacos; Mamouri, Rodanthi; Michaelides, Silas; Nisantzi, Argyro; Papoutsa, Christiana; Neocleous, Kyriacos; Mettas, Christodoulos; Tzouvaras, Marios; Evagorou, Evagoras; Christofe, Andreas; Melillos, George; Papoutsis, Ioannis

    2017-10-01

    The aim of this paper is to present the strategy and vision to upgrade the existing ERATOSTHENES Research Centre (ERC) established within the Cyprus University of Technology (CUT) into a sustainable, viable and autonomous Centre of Excellence (CoE) for Earth Surveillance and Space-Based Monitoring of the Environment, which will provide the highest quality of related services on the National, European and International levels. EXCELSIOR is a Horizon 2020 Teaming project which addresses a specific challenge defined by the work program, namely, the reduction of substantial disparities in the European Union by supporting research and innovation activities and systems in low performing countries. It also aims at establishing long-term and strategic partnerships between the Teaming partners, thus reducing internal research and innovation disparities within European Research and Innovation landscape. The proposed CoE envisions the upgrading of the existing ERC into an inspiring environment for conducting basic and applied research and innovation in the areas of the integrated use of remote sensing and space-based techniques for monitoring the environment. Environment has been recognized by the Smart Specialization Strategy of Cyprus as the first horizontal priority for future growth of the island. The foreseen upgrade will regard the expansion of this vision to systematic monitoring of the environment using Earth Observation, space and ground based integrated technologies. Such an approach will lead to the systematic monitoring of all three domains of the Environment (Air, Land, Water). Five partners have united to upgrade the existing ERC into a CoE, with the common vision to become a world-class innovation, research and education centre, actively contributing to the European Research Area (ERA). More specifically, the Teaming project is a team effort between the Cyprus University of Technology (CUT, acting as the coordinator), the German Aerospace Centre (DLR), the

  13. Intellectual Data Analysis Method for Evaluation of Virtual Teams

    Directory of Open Access Journals (Sweden)

    Sandra Strigūnaitė

    2013-01-01

    Full Text Available The purpose of the article is to present a method for virtual team performance evaluation based on intelligent team member collaboration data analysis. The motivation for the research is based on the ability to create an evaluation method that is similar to ambiguous expert evaluations. The concept of the hierarchical fuzzy rule based method aims to evaluate the data from virtual team interaction instances related to implementation of project tasks. The suggested method is designed for project managers or virtual team leaders to help in virtual teamwork evaluation that is based on captured data analysis. The main point of the method is the ability to repeat human thinking and expert valuation process for data analysis by applying fuzzy logic: fuzzy sets, fuzzy signatures and fuzzy rules. The fuzzy set principle used in the method allows evaluation criteria numerical values to transform into linguistic terms and use it in constructing fuzzy rules. Using a fuzzy signature is possible in constructing a hierarchical criteria structure. This structure helps to solve the problem of exponential increase of fuzzy rules including more input variables. The suggested method is aimed to be applied in the virtual collaboration software as a real time teamwork evaluation tool. The research shows that by applying fuzzy logic for team collaboration data analysis it is possible to get evaluations equal to expert insights. The method includes virtual team, project task and team collaboration data analysis. The advantage of the suggested method is the possibility to use variables gained from virtual collaboration systems as fuzzy rules inputs. Information on fuzzy logic based virtual teamwork collaboration evaluation has evidence that can be investigated in the future. Also the method can be seen as the next virtual collaboration software development step.

  14. Red Teaming: Past and Present

    Science.gov (United States)

    2008-05-22

    cultural and ethnocentric bias, and a focus on fully exploring alternatives. The purpose of this monograph is to examine historical and...Planning and Orders Production, introduces red team principles into the army problem solving method.14 Additionally, TRADOC staffed and funded the...organization, incorporating alternative perspectives in an attempt to eliminate cultural and ethnocentric bias, and a focus on fully exploring

  15. The role of HRM practices in building intellectual capital in knowledge-based teams

    DEFF Research Database (Denmark)

    Jørgensen, Frances; Becker, Karen

    2013-01-01

    In this paper, we investigate the ways HRM systems support development of intellectual capital in teams in three case studies of knowledge-intensive firms (KIFs) in Denmark. By focusing on team composition and structure, findings build on the rapidly growing body of literature on HRM’s role....... The findings also have managerial implications regarding the need to align team composition and structure, HRM systems, and intellectual capital focus to support development of team-based intellectual capital....

  16. AA magnet measurement team

    CERN Multimedia

    CERN PhotoLab

    1978-01-01

    Quickly improvised measurement equipment for the AA (Antiproton Accumulator) was all the tight schedule permitted, but the high motivation of the team made up for the lack of convenience. From left to right: Roy Billinge (Joint AA Project Leader, the other one was Simon van der Meer); Bruno Autin, Brian Pincott, Colin Johnson.

  17. Logistics of Mathematical Modeling-Focused Projects

    Science.gov (United States)

    Harwood, R. Corban

    2018-01-01

    This article addresses the logistics of implementing projects in an undergraduate mathematics class and is intended both for new instructors and for instructors who have had negative experiences implementing projects in the past. Project implementation is given for both lower- and upper-division mathematics courses with an emphasis on mathematical…

  18. Goal Orientation in Teams: The Role of Diversity

    NARCIS (Netherlands)

    A. Nederveen Pieterse (Anne)

    2009-01-01

    textabstractOrganizations make increasingly use of teams as their basic structure, making it more and more important to determine what enables optimal team functioning. Over the past decades, the goals people focus on in achievement settings (i.e. goal orientation) is shown to be highly important

  19. Team-Based Professional Development Interventions in Higher Education: A Systematic Review

    Science.gov (United States)

    Gast, Inken; Schildkamp, Kim; van der Veen, Jan T.

    2017-01-01

    Most professional development activities focus on individual teachers, such as mentoring or the use of portfolios. However, new developments in higher education require teachers to work together in teams more often. Due to these changes, there is a growing need for professional development activities focusing on teams. Therefore, this review study…

  20. Team-Based Learning Module for Undergraduate Medical Education: a Module Focused on the Human Papilloma Virus to Increase Willingness to Vaccinate.

    Science.gov (United States)

    Wiley, Rachel; Shelal, Zeena; Bernard, Carolyn; Urbauer, Diana; Toy, Eugene; Ramondetta, Lois

    2017-12-26

    Human papilloma virus (HPV) vaccination rates lag behind other vaccines, primarily because of weak provider recommendations, and are associated with nearly 30,000 new cancer diagnoses a year. Educating medical students about HPV using active, team-centered learning may increase assimilation of information and may increase vaccination rates. A team-based learning (TBL) module focused on HPV for first-year medical students about HPV will better increase knowledge and likeliness to vaccinate than traditional education methods. Baseline HPV knowledge in medical students across Texas was assessed by surveying all 4-year undergraduate medical schools. Students at one medical school then participated in a week-long TBL focused on basic and clinical concepts relating to HPV, and then were re-surveyed upon completion of the course module. At baseline assessment, first-year student at the intervention site performed at the same level as first-year medical students across the state of Texas on knowledge and satisfaction with their HPV-related medical school education. After the TBL implementation, students performed significantly better than similar-year students and equal to graduating seniors, on knowledge of HPV- and HPV-related cancers, and report significantly higher satisfaction with education measures. Students at the intervention site were significantly more likely to recommend the HPV vaccination in future practice. Short-term knowledge and willingness to recommend vaccination are improved with a targeted HPV TBL early in medical education, which may provide a basis of knowledge that could translate into improved vaccination rates.

  1. A Method for Knowledge Management and Communication Within and Across Multidisciplinary Teams

    Directory of Open Access Journals (Sweden)

    Don Flynn

    2009-06-01

    Full Text Available The use of knowledge management (KM and communication tools in an applied scientific arena where research is performed and knowledge must be managed within and across multidisciplinary teams and organizations is a challenge. Teams of scientists and engineers from up to 17 different technical specialties required knowledge management tools for developing multiple environmental impact statements under challenging circumstances. Factors that contributed to the success of the KM tools included 1 pairing of project staff with Knowledge Systems staff to determine system requirements, 2 the use of the tools by the team as they were being developed thus allowing many opportunities for feedback and interaction, 3 developing the tools to approximate the overall project structure and work flow already in place, 4 providing immediate assistance to the project team as they learned to use the new KM tools, and 5 replacing earlier practices with the new KM approach by "burning the bridges" to past practices after the team had learned to use the new KM tools.

  2. International Thermonuclear Experimental Reactor U.S. Home Team Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Sowder, W. K.

    1998-10-01

    The International Thermonuclear Experimental Reactor (ITER) project is unique in that the work is divided among an international Joint Central Team and four Home Teams, with the overall responsibility for the quality of activities performed during the project residing with the ITER Director. The ultimate responsibility for the adequacy of work performed on tasks assigned to the U.S. Home Team resides with the U.S. Home Team Leader and the U.S. Department of Energy Office of Fusion Energy (DOE-OFE). This document constitutes the quality assurance plan for the ITER U.S. Home Team. This plan describes the controls exercised by U.S. Home Team management and the Performing Institutions to ensure the quality of tasks performed and the data developed for the Engineering Design Activities assigned to the U.S. Home Team and, in particular, the Research and Development Large Projects (7). This plan addresses the DOE quality assurance requirements of 10 CFR 830.120, "Quality Assurance." The plan also describes U.S. Home Team quality commitments to the ITER Quality Assurance Program. The ITER Quality Assurance Program is based on the principles described in the International Atomic Energy Agency Standard No. 50-C-QA, "Quality Assurance for Safety in Nuclear Power Plants and Other Nuclear Facilities." Each commitment is supported with preferred implementation methodology that will be used in evaluating the task quality plans to be submitted by the Performing Institutions. The implementing provisions of the program are based on guidance provided in American National Standards Institute/American Society of Mechanical Engineers NQA-1 1994, "Quality Assurance." The individual Performing Institutions will implement the appropriate quality program provisions through their own established quality plans that have been reviewed and found to comply with U.S. Home Team quality assurance plan commitments to the ITER Quality Assurance Program. The extent of quality program provisions

  3. A Decade of Project 2061

    Science.gov (United States)

    Lagowski, J. J.

    1996-04-01

    question was: What should all high school graduates know and be able to do in science, mathematics, and technology? Science for All Americans established the ground rules for what has become to be known as systematic reform. Thus, reform must be comprehensive in the sense that it involves all children, all grades, and all subjects; and, it must be long term. The approach to curriculum development was ambitious. Curriculum reform should be shaped by a vision of the lasting knowledge and skills students need to acquire by the time they become adults. Moreover, the common core of learning in science, mathematics, and technology should center on science literacy. A common set of learning goals did not imply a uniform curriculum, funding methods, or materials. But above all, schools should not try to teach more, but less. In other words, the new curriculum to be developed was not the accretion of additional layers of material on top of the existing structure; that's why the designers suggested it might take a quarter of a century to achieve its goals. Science for All Americans construed the notion of science literacy broadly, by focusing on interconnected understanding in the natural and social sciences, mathematics, and technology. After the publication of Science for All Americans, Project 2061 turned its attention to developing tools to help redesign curricula around the science literacy goals and to helping teachers think through the implications for other aspects of the education system. To illustrate the flexibility of this approach, Project 2061 established school district teams in six diverse geographical areas--three rural school districts in Georgia; the school districts in Philadelphia, San Antonio, San Diego, and San Francisco; and a small suburban school district near Madison, Wisconsin. Planning for 13 years of schooling in science, mathematics, and technology involved teams of teachers in each ISD. Each team included five elementary teachers, five middle school

  4. Using Focused Laboratory Management and Quality Improvement Projects to Enhance Resident Training and Foster Scholarship

    Science.gov (United States)

    Ford, Bradley A.; Klutts, J. Stacey; Jensen, Chris S.; Briggs, Angela S.; Robinson, Robert A.; Bruch, Leslie A.; Karandikar, Nitin J.

    2017-01-01

    Training in patient safety, quality, and management is widely recognized as an important element of graduate medical education. These concepts have been intertwined in pathology graduate medical education for many years, although training programs face challenges in creating explicit learning opportunities in these fields. Tangibly involving pathology residents in management and quality improvement projects has the potential to teach and reinforce key concepts and further fulfill Accreditation Council for Graduate Medical Education goals for pursuing projects related to patient safety and quality improvement. In this report, we present our experience at a pathology residency program (University of Iowa) in engaging pathology residents in projects related to practical issues of laboratory management, process improvement, and informatics. In this program, at least 1 management/quality improvement project, typically performed during a clinical chemistry/management rotation, was required and ideally resulted in a journal publication. The residency program also initiated a monthly management/informatics series for pathology externs, residents, and fellows that covers a wide range of topics. Since 2010, all pathology residents at the University of Iowa have completed at least 1 management/quality improvement project. Many of the projects involved aspects of laboratory test utilization, with some projects focused on other areas such as human resources, informatics, or process improvement. Since 2012, 31 peer-reviewed journal articles involving effort from 26 residents have been published. Multiple projects resulted in changes in ongoing practice, particularly within the hospital electronic health record. Focused management/quality improvement projects involving pathology residents can result in both meaningful quality improvement and scholarly output. PMID:28913416

  5. Using Focused Laboratory Management and Quality Improvement Projects to Enhance Resident Training and Foster Scholarship.

    Science.gov (United States)

    Krasowski, Matthew D; Ford, Bradley A; Klutts, J Stacey; Jensen, Chris S; Briggs, Angela S; Robinson, Robert A; Bruch, Leslie A; Karandikar, Nitin J

    2017-01-01

    Training in patient safety, quality, and management is widely recognized as an important element of graduate medical education. These concepts have been intertwined in pathology graduate medical education for many years, although training programs face challenges in creating explicit learning opportunities in these fields. Tangibly involving pathology residents in management and quality improvement projects has the potential to teach and reinforce key concepts and further fulfill Accreditation Council for Graduate Medical Education goals for pursuing projects related to patient safety and quality improvement. In this report, we present our experience at a pathology residency program (University of Iowa) in engaging pathology residents in projects related to practical issues of laboratory management, process improvement, and informatics. In this program, at least 1 management/quality improvement project, typically performed during a clinical chemistry/management rotation, was required and ideally resulted in a journal publication. The residency program also initiated a monthly management/informatics series for pathology externs, residents, and fellows that covers a wide range of topics. Since 2010, all pathology residents at the University of Iowa have completed at least 1 management/quality improvement project. Many of the projects involved aspects of laboratory test utilization, with some projects focused on other areas such as human resources, informatics, or process improvement. Since 2012, 31 peer-reviewed journal articles involving effort from 26 residents have been published. Multiple projects resulted in changes in ongoing practice, particularly within the hospital electronic health record. Focused management/quality improvement projects involving pathology residents can result in both meaningful quality improvement and scholarly output.

  6. Shared Leadership Improves Team Novelty: The Mechanism and Its Boundary Condition

    Science.gov (United States)

    Sun, Xiaomin; Jie, Yuan; Wang, Yilu; Xue, Gang; Liu, Yan

    2016-01-01

    Previous research has revealed the significant impact of shared leadership on team creativity, yet the mechanism underlying this relationship has rarely been investigated. The current research examined how shared leadership influenced team creativity (novelty and usefulness) across 3 studies using both long-term project teams and temporal task teams in the laboratory. The results showed that shared leadership enhanced the novelty dimension of team creativity by improving constructive controversy. Furthermore, team goal orientation moderated this effect. The indirect effect of constructive controversy holds for teams with learning goal orientation but not for those with performance goal orientation. Such patterns were not found in the usefulness dimension of team creativity. PMID:28066289

  7. Project-Based Learning: A Promising Approach to Improving Student Outcomes. Issue Focus

    Science.gov (United States)

    Quint, Janet; Condliffe, Barbara

    2018-01-01

    The concept of project-based learning (PBL) has garnered wide support among a number of K-12 education policy advocates and funders. PBL is viewed as an approach that enables students to develop the "21st century competencies"--cognitive and socioemotional skills--needed for success in college and careers. This issue focus, pulling from…

  8. Investigating the extent to which mobile phones reduce Knowledge Transfer barriers in Student Project Teams

    Directory of Open Access Journals (Sweden)

    Michael E. Kyobe

    2011-03-01

    Full Text Available Group learning plays a key role in the transfer of knowledge. In institutions of learning, it enhances students’ understanding, critical thinking, integration of knowledge and knowledge sharing. However, the transfer of knowledge in group projects is often impeded by factors such as time and budget constraints, individual and social barriers, and a lack of motivation.Institutions of learning are increasingly adopting information and communication technologies (e.g. mobile technologies to provide solutions to the challenges facing them. Whilst the integration of the mobile context and technologies in learning environment has been encouraged over the years, and indeed many students today can use mobile phones, the effectiveness of these technologies in reducing impediments to knowledge transfer in group learning has not been investigated.This study investigated the extent to which mobile phones reduce the barriers to knowledge transfer in project groups. The impediments examined include the nature of knowledge, social barriers, lack of time and lack of motivation. Quantitative and qualitative approaches were used to collect and analyse the data. The sample consisted of 85 students engaged in group projects in the departments of Information Systems, Civil Engineering, Computer Science and Construction Engineering.The results show that mobile phones reduce all four knowledge transfer barriers investigated in the project groups. We found no significant difference in the nature of knowledge shared by teams with weak and strong ties. This suggests that teams with weak social ties who normally experience difficulty sharing complex (tacit knowledge can easily do so with the aid of mobile facilities. In addition, frequent users of mobile phones were motivated to share explicit knowledge with their peers whilst those who often work with tacit knowledge could convert it to explicit form and share it with others. Mobile features like short messaging

  9. [Support Team for Investigator-Initiated Clinical Research].

    Science.gov (United States)

    Fujii, Hisako

    2017-07-01

    Investigator-initiated clinical research is that in which investigators plan and carry out their own clinical research in academia. For large-scale clinical research, a team should be organized and implemented. This team should include investigators and supporting staff, who will promote smooth research performance by fulfilling their respective roles. The supporting staff should include project managers, administrative personnel, billing personnel, data managers, and clinical research coordinators. In this article, I will present the current status of clinical research support and introduce the research organization of the Dominantly Inherited Alzheimer Network (DIAN) study, an investigator-initiated international clinical research study, with particular emphasis on the role of the project management staff and clinical research coordinators.

  10. Project manager attributes influencing project success in the South ...

    African Journals Online (AJOL)

    success criteria for building projects in Ghana and concluded that the “current and ... qualifications, profession, leadership style and project team ... and expectations of project management competence between ... 1.d. Sense of teamwork ...

  11. Occupational therapists in the interdisciplinary team setting.

    Science.gov (United States)

    Reed, S M

    1984-01-01

    The interdisciplinary team approach to patient care provides an answer to the fragmentation and confusion patients feel when dealing with our complex healthcare system. Even though the team approach has been in use for the past two decades, implementation of a successful team is very difficult and rarely sustained over a significant period of time. This is especially true in general hospitals and in physical rehabilitation programs that spring from general hospitals where the physician and the nurse are the traditional care group. Occupational therapists, as they establish roles on interdisciplinary teams as staff members and team leaders, will require a knowledge of what makes a team function effectively. They can use this knowledge to evaluate the status of their own team and contribute to changes that will insure its long-term success. Six key issues should be addressed during the planning stage of any new healthcare team to insure its continued viability. These issues are: program philosophy, client focus, role clarification, collaboration and information sharing, policies and procedures, and staff supportiveness.

  12. PERSPECTIVES ON MULTIDISCIPLINARY TEAM PROCESSES AMONG HEALTHCARE EXECUTIVES: PROCESSES THAT FACILITATE TEAM EFFECTIVENESS.

    Science.gov (United States)

    Landry, Amy; Erwin, Cathleen

    2015-01-01

    Multidisciplinary teams (MDTs) are used in healthcare organizations to address both clinical and managerial functions. Despite their prevalence, little is known about how team processes work to facilitate effectiveness among MDT leadership teams. This study explores perceptions of MDT participation experienced by organizational leaders in healthcare organizations in the United States. A survey of American College of Healthcare Executives members was conducted to assess involvement and perceptions of MDTs among health care management professionals. Descriptive statistics, independent T-Tests and Chi-square analyses were used to examine participation in MDTs, perception of MDT processes, and the association of participation and perceived processes with employee and organizational characteristics. The survey yielded a sample comprised of 492 healthcare executive or executive-track employees. An overwhelming majority indicated participation in MDTs. The study identified team processes that could use improvement including communication, cooperation, and conflict resolution. The study provides evidence that can help guide the development of training programs that focus on providing managerial leaders with strategies aimed at improving communication, coordination, and conflict resolution that will improve the effectiveness of MDT functioning in healthcare organizations.

  13. Evaluation of an Initiative for Fostering Provider-Pharmacist Team Management of Hypertension in Communities

    OpenAIRE

    William R. Doucette; Cailin Lickteig; Stevie Veach; Barry Carter; Barcey Levy

    2014-01-01

    Objectives: 1) Conduct team building activities for provider-community pharmacist teams in small communities and 2) Determine the impact of the team approach on practitioner-reported consequences and 3) Identify obstacles to the team approach and ways to overcome them. Methods: Eleven provider-pharmacist teams were recruited in rural/micropolitan communities in Iowa. The teams participated in team building sessions facilitated by the project leaders, to discuss the team approach. Decisio...

  14. The Development of Mature Capabilities for Understanding and Valuing Technology through School Project Work.

    Science.gov (United States)

    Schallies, Michael; Wellensiek, Anneliese; Lembens, Anja

    This paper describes a German project that developed students' capabilities for understanding and valuing biotechnology and genetic engineering, focusing on practical fieldwork with schools by an interdisciplinary team. The paper identifies the characteristics of individual and structural preconditions and their development during active project…

  15. Team situation awareness in nuclear power plant process control: A literature review, task analysis and future research

    International Nuclear Information System (INIS)

    Ma, R.; Kaber, D. B.; Jones, J. M.; Starkey, R. L.

    2006-01-01

    Operator achievement and maintenance of situation awareness (SA) in nuclear power plant (NPP) process control has emerged as an important concept in defining effective relationships between humans and automation in this complex system. A literature review on factors influencing SA revealed several variables to be important to team SA, including the overall task and team goals, individual tasks, team member roles, and the team members themselves. Team SA can also be adversely affected by a range of factors, including stress, mental over- or under-loading, system design (including human-machine interface design), complexity, human error in perception, and automation. Our research focused on the analysis of 'shared' SA and team SA among an assumed three-person, main-control-room team. Shared SA requirements represent the knowledge that is held in common by NPP operators, and team SA represents the collective, unique knowledge of all operators. The paper describes an approach to goal-directed task analysis (GDTA) applied to NPP main control room operations. In general, the GDTA method reveals critical operator decision and information requirements. It identifies operator SA requirements relevant to performing complex systems control. The GDTA can reveal requirements at various levels of cognitive processing, including perception, comprehension and projection, in NPP process control. Based on the literature review and GDTA approach, a number of potential research issues are proposed with an aim toward understanding and facilitating team SA in NPP process control. (authors)

  16. Fast Paced, Low Cost Projects at MSFC

    Science.gov (United States)

    Watson-Morgan, Lisa; Clinton, Raymond

    2012-01-01

    What does an orbiting microsatellite, a robotic lander and a ruggedized camera and telescope have in common? They are all fast paced, low cost projects managed by Marshall Space Flight Center (MSFC) teamed with successful industry partners. MSFC has long been synonymous with human space flight large propulsion programs, engineering acumen and risk intolerance. However, there is a growing portfolio/product line within MSFC that focuses on these smaller, fast paced projects. While launching anything into space is expensive, using a managed risk posture, holding to schedule and keeping costs low by stopping at egood enough f were key elements to their success. Risk is defined as the possibility of loss or failure per Merriam Webster. The National Aeronautics and Space Administration (NASA) defines risk using procedural requirement 8705.4 and establishes eclasses f to discern the acceptable risk per a project. It states a Class D risk has a medium to significant risk of not achieving mission success. MSFC, along with industry partners, has created a niche in Class D efforts. How did the big, cautious MSFC succeed on these projects that embodied the antithesis of its heritage in human space flight? A key factor toward these successful projects was innovative industry partners such as Dynetics Corporation, University of Alabama in Huntsville (UAHuntsville), Johns Hopkins Applied Physics Laboratory (JHU APL), Teledyne Brown Engineering (TBE), Von Braun Center for Science and Innovation (VCSI), SAIC, and Jacobs. Fast Affordable Satellite Technology (FastSat HSV01) is a low earth orbit microsatellite that houses six instruments with the primary scientific objective of earth observation and technology demonstration. The team was comprised of Dynetics, UAHuntsvile, SAIC, Goddard Space Flight Center (GSFC) and VCSI with the United States Air Force Space Test Program as the customer. The team completed design, development, manufacturing, environmental test and integration in

  17. Two staged incentive contract focused on efficiency and innovation matching in critical chain project management

    Directory of Open Access Journals (Sweden)

    Min Zhang

    2014-09-01

    Full Text Available Purpose: The purpose of this paper is to define the relative optimal incentive contract to effectively encourage employees to improve work efficiency while actively implementing innovative behavior. Design/methodology/approach: This paper analyzes a two staged incentive contract coordinated with efficiency and innovation in Critical Chain Project Management using learning real options, based on principle-agent theory. The situational experiment is used to analyze the validity of the basic model. Finding: The two staged incentive scheme is more suitable for employees to create and implement learning real options, which will throw themselves into innovation process efficiently in Critical Chain Project Management. We prove that the combination of tolerance for early failure and reward for long-term success is effective in motivating innovation. Research limitations/implications: We do not include the individual characteristics of uncertain perception, which might affect the consistency of external validity. The basic model and the experiment design need to improve. Practical Implications: The project managers should pay closer attention to early innovation behavior and monitoring feedback of competition time in the implementation of Critical Chain Project Management. Originality/value: The central contribution of this paper is the theoretical and experimental analysis of incentive schemes for innovation in Critical Chain Project Management using the principal-agent theory, to encourage the completion of CCPM methods as well as imitative free-riding on the creative ideas of other members in the team.

  18. Learning from project experiences using a legacy-based approach

    Science.gov (United States)

    Cooper, Lynne P.; Majchrzak, Ann; Faraj, Samer

    2005-01-01

    As project teams become used more widely, the question of how to capitalize on the knowledge learned in project teams remains an open issue. Using previous research on shared cognition in groups, an approach to promoting post-project learning was developed. This Legacy Review concept was tested on four in tact project teams. The results from those test sessions were used to develop a model of team learning via group cognitive processes. The model and supporting propositions are presented.

  19. A Systematic Review of Developing Team Competencies in Information Systems Education

    Science.gov (United States)

    Figl, Kathrin

    2010-01-01

    The ability to work effectively in teams has been a key competence for information systems engineers for a long time. Gradually, more attention is being paid to developing this generic competence as part of academic curricula, resulting in two questions: how to best promote team competencies and how to implement team projects successfully. These…

  20. Developing Expert Teams with a Strong Safety Culture

    Science.gov (United States)

    Rogers, David G.

    2010-01-01

    Would you like to lead a world renowned team that draws out all the talents and expertise of its members and consistently out performs all others in the industry? Ever wonder why so many organizations fail to truly learn from past mistakes only to repeat the same ones at a later date? Are you a program/project manager or team member in a high-risk organization where the decisions made often carry the highest of consequences? Leadership, communication, team building, critical decision-making and continuous team improvement skills and behaviors are mere talking points without the attitudes, commitment and strategies necessary to make them the very fabric of a team. Developing Expert Teams with a Strong Safety Culture, will provide you with proven knowledge and strategies to take your team soaring to heights you may have not thought possible. A myriad of teams have applied these strategies and techniques within their organization team environments: military and commercial aviation, astronaut flight crews, Shuttle flight controllers, members of the Space Shuttle Program Mission Management Team, air traffic controllers, nuclear power control teams, surgical teams, and the fire service report having spectacular success. Many industry leaders are beginning to realize that although the circumstances and environments of these teams may differ greatly to their own, the core elements, governing principles and dynamics involved in managing and building a stellar safety conscious team remain identical.

  1. Peer mentored teams to support undergraduate group work in higher education

    Science.gov (United States)

    Cinderey, Lynn Elizabeth

    This research starts with a set of practical research questions to investigate a problem which occurs in some computing undergraduate modules that use group work as part of the learning and assessment strategy. In this study final year students with experience in information systems project work and trained in team processes met with small groups of first year computing students with the aim of turning the first year project group into a team. This study seeks to explore the experience of the final year students as they take on the role of peer tutor looking at the problems they perceive within the first year teams and the skills and knowledge they use to help them. The study includes the recruitment and training of final year students (n=9) and allocation to first year teams. The final year students acted as co-researchers and team leaders in L4 Information Systems project work and recorded their thoughts and observations in a diary during the first semester of 2008/9 academic year. Diary data was supplemented by interview data from a sample of final year students (n=4). The sample was selected based on the richness of the data provided in the diaries and the number of meetings held with their teams. Rich data and thick descriptions were essential for a phenomenological examination of the experience of the final year students. A number of findings emerged. A critical approach to analysis revealed ongoing conflicts occurred across cultural divides within the first year teams that final year leaders did not articulate or appear fully aware of. This had important implications for individual team members. Other findings which relate to issues of changing levels of motivation in the teams over the ten weeks, roles adopted by the leaders, ability to systematize the project or team processes and the ability to reflect on unsuccessful strategies also had implications for peer mentoring training and support. The picture that emerged from the data suggested that lack of

  2. An effective board from a team perspective

    Directory of Open Access Journals (Sweden)

    Eythor Ivar Jonsson

    2006-11-01

    Full Text Available This paper looks at boards from a team perspective, where insights from research on teams are used to discuss some classical problems of corporate governance. The Enron-case is used as an underlying theme as it portrays some of the biggest challenges that boards face today. Theories developed within the team literature emphasise that for boards to become more effective they need more time and better access to information as a source of knowledge, more structure and purposeful roles for directors and for the board in general, and they need to become smaller and more focused. In effect, the culture of teams could have avoided some of the blunders of the Enron board.

  3. A Tune-Up for Stymied Teams: When a Group's Focus Falters, Take Steps to Get Back on Track

    Science.gov (United States)

    Hesson, Renee

    2013-01-01

    Even the most efficient team of teachers can become ineffective. Conversely, even the most ineffective team can be made more efficient and productive. The keys to refocusing a committed team on the instructional goals originally established by the group are through reality, relationships, and reflection. These critical components of effective…

  4. Teams and teamwork during a cancer diagnosis: interdependency within and between teams.

    Science.gov (United States)

    Taplin, Stephen H; Weaver, Sallie; Chollette, Veronica; Marks, Lawrence B; Jacobs, Andrew; Schiff, Gordon; Stricker, Carrie T; Bruinooge, Suanna S; Salas, Eduardo

    2015-05-01

    This article discusses the care process among three groups (primary care, radiology, and surgery) aiding a 57-year-old woman during her screening mammography and diagnosis of breast cancer. This is the first in a series of articles exploring principles and topics relevant to teams guiding clinicians involved in cancer care. The challenges demonstrated in this case illustrate how clinicians work within and between groups to deliver this first phase of cancer care. The case helps demonstrate the differences between groups and teams. Focusing on the patient and the overall process of care coordination can help move groups toward becoming teams who deliver better care by identifying and managing goals, roles, and interdependent care tasks. Care providers and researchers can use the case to consider their own work and essential aspects of teamwork needed to improve care, patient outcomes, and the evidence that supports each. Copyright © 2015 by American Society of Clinical Oncology.

  5. Performance Evaluation and Opportunity Assessment for St. Bernard Project

    Energy Technology Data Exchange (ETDEWEB)

    Dickson, B.

    2011-06-01

    This report describes efforts by IBACOS, a Department of Energy Building America research team, in the St. Bernard Project, a nonprofit, community-based organization whose mission is to assist Hurricane Katrina survivors return to their homes in the New Orleans area. The report focuses on energy modeling results of two plans that the St. Bernard Project put forth as 'typical' building types and on quality issues that were observed during the field walk and Best Practice recommendations that could improve the energy efficiency and durability of the renovated homes.

  6. Performance Evaluation and Opportunity Assessment for St. Bernard Project

    Energy Technology Data Exchange (ETDEWEB)

    Dickson, Bruce [IBACOS, Inc., Pittsburgh, PA (United States)

    2011-06-01

    This report describes efforts by IBACOS, a Building America research team, in the St. Bernard Project, a nonprofit, community-based organization whose mission is to assist Hurricane Katrina survivors to return to their homes in the New Orleans area. The report focuses on energy modeling results of two plans that the St. Bernard Project put forth as 'typical' building types and on quality issues that were observed during the field walk and best practice recommendations that could improve the energy efficiency and durability of the renovated homes.

  7. Swedish pediatric diabetes teams' perception of fathers' involvement: A Grounded Theory study.

    Science.gov (United States)

    Boman, Ase; Povlsen, Lene; Dahlborg-Lyckhage, Elisabeth; Borup, Ina

    2013-06-01

    The purpose of this study was to analyze how Swedish pediatric diabetes teams perceived and discussed fathers' involvement in the care of their child with type 1 diabetes. It also aimed to discuss how the teams' attitudes towards the fathers' involvement developed during the data collection process. The Constructivist Grounded Theory design was used and data were collected during three repeated focus group discussions with three Swedish pediatric diabetes teams. The core category of the teams' perception of fathers' involvement emerged as: If dad attends, we are happy - if mom doesn't, we become concerned. Initially the teams balanced their perception of fathers' involvement on the mother's role as the primary caregiver. In connection with the teams' directed attention on fathers, in the focus group discussions, the teams' awareness of the importance of fathers increased. As a consequence, the team members began to encourage fathers' engagement in their child's care. We conclude that by increasing the teams' awareness of fathers as a health resource, an active health promotion perspective could be implemented in pediatric diabetes care. © 2012 Wiley Publishing Asia Pty Ltd.

  8. Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

    Science.gov (United States)

    Kennedy, Kriss J.; Toup, Larry; Gill, Tracy; Tri, Terry; Howe, Scott; Smitherman, David

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project

  9. A Descriptive Account of an Inter-Professional Collaborative Leadership Project

    Directory of Open Access Journals (Sweden)

    Maura MacPhee

    2014-09-01

    Full Text Available A collaborative project between an academic healthcare faculty and a professional development director resulted in the design, delivery and evaluation of an inter-professional collaborative leadership workshop with ongoing leadership development activities. The workshop attendees were five inter-professional teams from one large, urban cancer care center in Taipei, Taiwan. The workshop included didactic instruction complemented with team discussions and interactive exercises. Continued practice was encouraged, such as appreciative inquiry exercises and rotated team leadership. Evaluation involved the use of a cross-culturally validated collaborative practice tool and follow-up interviews and focus groups. Although the formal workshop was a 1-day session, continued organizational support and systematic approaches to collaborative leadership practice in clinical settings were necessary components for transfer of learning from the workshop to real life. This paper will include an overview of the foundational leadership concepts covered in the workshop. The instructional strategies, evaluation methods and outcomes will be discussed. The limitations and strengths of this collaborative leadership project will be provided, as well as future plans for a collaborative leadership development program.

  10. Negative affect reduces team awareness: the effects of mood and stress on computer-mediated team communication.

    Science.gov (United States)

    Pfaff, Mark S

    2012-08-01

    This article presents research on the effects of varying mood and stress states on within-team communication in a simulated crisis management environment, with a focus on the relationship between communication behaviors and team awareness. Communication plays a critical role in team cognition along with cognitive factors such as attention, memory, and decision-making speed. Mood and stress are known to have interrelated effects on cognition at the individual level, but there is relatively little joint exploration of these factors in team communication in technologically complex environments. Dyadic communication behaviors in a distributed six-person crisis management simulation were analyzed in a factorial design for effects of two levels of mood (happy, sad) and the presence or absence of a time pressure stressor. Time pressure and mood showed several specific impacts on communication behaviors. Communication quantity and efficiency increased under time pressure, though frequent requests for information were associated with poor performance. Teams in happy moods showed enhanced team awareness, as revealed by more anticipatory communication patterns and more detailed verbal responses to teammates than those in sad moods. Results show that the attention-narrowing effects of mood and stress associated with individual cognitive functions demonstrate analogous impacts on team awareness and information-sharing behaviors and reveal a richer understanding of how team dynamics change under adverse conditions. Disentangling stress from mood affords the opportunity to target more specific interventions that better support team awareness and task performance.

  11. Crisis Team Management in a Scarce Resource Setting: Angkor Hospital for Children in Siem Reap, Cambodia

    Directory of Open Access Journals (Sweden)

    Richard Alynn Henker

    2017-07-01

    Full Text Available IntroductionA crisis team management (CTM simulation course was developed by volunteers from Health Volunteers Overseas for physicians and nurses at Angkor Hospital for Children (AHC in Siem Reap, Cambodia. The framework for the course was adapted from crisis resource management (1, 2, crisis team training (3, and TeamSTEPPs© models (4. The CTM course focused on teaching physicians and nurses on the development of team performance knowledge, skills, and attitudes. Challenges to providing this course at AHC included availability of simulation equipment, cultural differences in learning, and language barriers. The purpose of this project was to evaluate the impact of a CTM simulation course at AHC on attitudes and perceptions of participants on concepts related to team performance.MethodsEach of the CTM courses consisted of three lectures, including team performance concepts, communication, and debriefing followed by rotation through four simulation scenarios. The evaluation instrument used to evaluate the AHC CTM course was developed for Cambodian staff at AHC based on TeamSTEPPs© instruments evaluating attitude and perceptions of team performance (5. CTM team performance concepts included in lectures, debriefing sessions, and the evaluation instrument were: team structure, leadership, situation monitoring, mutual support, and communication. The Wilcoxon signed-rank test was used to analyze pre- and post-test paired data from participants in the course.ResultsOf the 54 participants completing the three CTM courses at AHC, 27 were nurses, 6 were anesthetists, and 21 were physicians. Attitude and perception scores were found to significantly improve (p < 0.05 for team structure, leadership, situation monitoring, and communication. Team performance areas that improved the most were: discussion of team performance, communication, and exchange of information.ConclusionTeaching of non-technical skills can be effective in a setting with scarce

  12. Crisis Team Management in a Scarce Resource Setting: Angkor Hospital for Children in Siem Reap, Cambodia.

    Science.gov (United States)

    Henker, Richard Alynn; Henker, Hiroko; Eng, Hor; O'Donnell, John; Jirativanont, Tachawan

    2017-01-01

    A crisis team management (CTM) simulation course was developed by volunteers from Health Volunteers Overseas for physicians and nurses at Angkor Hospital for Children (AHC) in Siem Reap, Cambodia. The framework for the course was adapted from crisis resource management (1, 2), crisis team training (3), and TeamSTEPPs© models (4). The CTM course focused on teaching physicians and nurses on the development of team performance knowledge, skills, and attitudes. Challenges to providing this course at AHC included availability of simulation equipment, cultural differences in learning, and language barriers. The purpose of this project was to evaluate the impact of a CTM simulation course at AHC on attitudes and perceptions of participants on concepts related to team performance. Each of the CTM courses consisted of three lectures, including team performance concepts, communication, and debriefing followed by rotation through four simulation scenarios. The evaluation instrument used to evaluate the AHC CTM course was developed for Cambodian staff at AHC based on TeamSTEPPs© instruments evaluating attitude and perceptions of team performance (5). CTM team performance concepts included in lectures, debriefing sessions, and the evaluation instrument were: team structure, leadership, situation monitoring, mutual support, and communication. The Wilcoxon signed-rank test was used to analyze pre- and post-test paired data from participants in the course. Of the 54 participants completing the three CTM courses at AHC, 27 were nurses, 6 were anesthetists, and 21 were physicians. Attitude and perception scores were found to significantly improve ( p  < 0.05) for team structure, leadership, situation monitoring, and communication. Team performance areas that improved the most were: discussion of team performance, communication, and exchange of information. Teaching of non-technical skills can be effective in a setting with scarce resources in a Southeastern Asian country.

  13. Perturbed Communication in a Virtual Environment to Train Medical Team Leaders

    OpenAIRE

    Huguet , Lauriane; Lourdeaux , Domitile; Sabouret , Nicolas; Ferrer , Marie-Hélène

    2016-01-01

    International audience; The VICTEAMS project aims at designing a virtual environment for training medical team leaders to non-technical skills. The virtual environment ispopulated with autonomous virtual agents who are able to make mistakes (in action or communication) in order to train rescue team leaders and to make them adaptive with all kinds of situations or teams.

  14. "The Fly on the Wall" Reflecting Team Supervision.

    Science.gov (United States)

    Prest, Layne E.; And Others

    1990-01-01

    Adapts reflecting team concept, a practical application of constructivist ideas, for use in group supervision. Evolving model includes a focus on the unique "fly on the wall" perspective of the reflecting team. Trainees are introduced to a multiverse of new ideas and perspectives in a context which integrates some of the most challenging…

  15. Proceedings of the second Atmospheric Radiation Measurement (ARM) Science Team Meeting

    International Nuclear Information System (INIS)

    1992-12-01

    The second Atmospheric Radiation Measurement (ARM) Science Team Meeting was held in Denver, Colorado, in October 1991. The five-day meeting provided a forum for a technical exchange among the members of the ARM Science Team and a discussion of the technical aspects of the project infrastructure. The meeting included several activities: Science Team presentations, discussions of the first site occupation plan, experiment design sessions, and poster sessions. This Proceedings document includes papers presented at the meeting. The papers included are those from the technical sessions, the experiment design sessions, the first site occupation, and descriptions of locales for future sites. Individual projects are processed separately for the database

  16. Making Up the Deficit: A South African Non-formal Education Project for Industrial Personnel.

    Science.gov (United States)

    Dovey, Ken

    1995-01-01

    Using guided apprenticeships in cognitive and social development and action research, a nonformal education project focused on developing strategic thinking, team values, and internal locus of control in 20 South African industrial participants. Increased self-confidence, better communication/relationship skills, and a broader knowledge base were…

  17. [The organizational projects management led by head nurses: qualitative study from an educational device.

    Science.gov (United States)

    Dujardin, Pierre-Philippe; Reverdy, Thomas; Valette, Annick; François, Patrice

    2017-09-01

    The work of operational coordination led by head nurses (HN) is more known than their abilities to change work organization, as well as, care practices. In this article, we explore organizational projects led by HN. Depending on the situations, they may concern their health care team or involve institutional hierarchy or other teams. We rely on an intervention study, which enabled us to follow 17 organizational projects led by HN for one year. The results of this study highlight as the main condition for success, the HN' efforts to enable mutual understanding with other interested actors. Managers, who engage their health care team in the development of solutions, bring sustainable results. When problems involve the hierarchy, the managers focus on the development of personal relationships. When problems involve other departments, which they depend on, then they engage themselves into integrative negotiations. These results invite to open discussion about work organization and to formalize organizational projects. This intervention study also points out that work - training at operational audit is relevant for HN. Activé par Editorial Manager® et ProduXion.

  18. Bridges and Barriers to Developing and Conducting Interdisciplinary Graduate-Student Team Research

    Directory of Open Access Journals (Sweden)

    Wayde Cameron. Morse

    2007-12-01

    Full Text Available Understanding complex socio-environmental problems requires specialists from multiple disciplines to integrate research efforts. Programs such as the National Science Foundation's Integrative Graduate Education and Research Traineeship facilitate integrated research efforts and change the way academic institutions train future leaders and scientists. The University of Idaho and the Tropical Agricultural Research and Higher Education Center in Costa Rica collaborate on a joint research program focusing on biodiversity conservation and sustainable production in fragmented landscapes. We first present a spectrum of integration ranging from disciplinary to transdisciplinary across seven aspects of the research process. We then describe our experiences and lessons learned conducting interdisciplinary graduate student team research. Using our program as a case study, we examine the individual, disciplinary, and programmatic bridges and barriers to conducting interdisciplinary research that emerged during our student team research projects. We conclude with a set of recommendations for exploiting the bridges and overcoming the barriers to conducting interdisciplinary research, especially as part of graduate education programs.

  19. Materials Technical Team Roadmap

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2013-08-01

    Roadmap identifying the efforts of the Materials Technical Team (MTT) to focus primarily on reducing the mass of structural systems such as the body and chassis in light-duty vehicles (including passenger cars and light trucks) which enables improved vehicle efficiency regardless of the vehicle size or propulsion system employed.

  20. Distributing intelligence and organizing diversity in new media projects

    Directory of Open Access Journals (Sweden)

    Monique Girard

    2002-06-01

    Full Text Available This paper examines how web design firms in the new media industry probe and experiment with possible forms and sources of value giving shape to the new economy. Focusing on the collaborative engineering of cross-disciplinary web-design project teams, we examine how websites emerge as provisional settlements among the heterogeneous disciplines as they negotiate working compromises across competing performance criteria.

  1. Individual activities as an integrated part of project work - an innovative approach to project oriented and problem-based learning POPBL

    DEFF Research Database (Denmark)

    Moesby, Egon; Winther, Hans Henrik; Kørnøv, Lone

    2006-01-01

    in an individual activity to subsequently be separately assessed. The results of the individually oriented project work form the platform for final work with the project as a team. The students in each team are expected to evaluate the individual solutions and select the one solution to work on in the final phases......In this paper, the authors describe and, on the basis of a recently conducted survey, evaluate a way to increase student learning through the introduction of an individual project activity to the project oriented and problem-based and team-based project work - POPBL. This can be achieved not just...... by adding an individual activity outside or parallel to the project work, but by having the individual activity embedded as an integrated part of the overall team-based project work. In what the authors have deemed the extended project model, students work individually in the solution phase of the project...

  2. Project management of radwaste retrofits

    International Nuclear Information System (INIS)

    Vaught, D.L.

    1988-01-01

    Many utilities are finding it necessary to provide additional radioactive waste processing facilities at operating or nearly completed nuclear stations in order to accommodate the ever-changing regulatory, political and socio-economic environment in which we operate. This paper describes the project approach taken at Duke Power Company to provide a comprehensive radioactive waste processing facility at Oconee Nuclear Station. Following a historical perspective, the philosophy and mechanics of the project team are discussed. The goal of the project team was to provide a facility which could meet the liquid and solid radioactive waste processing needs of Oconee within the restraints of a utility budget and schedule. The unique quality of the project team approach was the integral involvement of all of the necessary departments in every part of the design, construction and start-up phases. The project team thereby utilized feedback from over thirty reactor years of operational experience. The remainder of the paper provides examples of the problems encountered and their resolution (eg. equipment layout, materials handling, vendor improvements and regulatory changes all required design-in-progress changes). It has been the integration and concentration of the diverse resources of a large utility into a cross-departmental team which has allowed the timely resolution of the necessary changes. This same philosophy is being applied to the facility start-up program and to other major projects at Duke Power Company

  3. Optical projects in the Clinic program at Harvey Mudd College

    Science.gov (United States)

    Yang, Q.

    2017-08-01

    Clinic program is the senior capstone program at Harvey Mudd College (HMC). Multidisciplinary and industry-sponsored projects allow a team of students to solve a real-world problem over one academic year. Over its 50 plus years, Clinic program has completed numerous optics related projects. This report gives an overview of the Clinic program, reviews recent optical projects and discusses how this program supports the learning of the HMC engineering students. A few sample optical projects with more details are presented to provide an insight of what challenges that undergraduates can overcome. Students achieve learning within the optics discipline and the related engineering disciplines. The experiences in these optical projects indicate the great potential to bringing optical hands-on projects into the undergraduate level. Because of the general engineering curriculum at HMC, these projects often work the best with a multidisciplinary nature even if the core of the project is optically focused. Students gain leadership training, oral and written communication skills and experiences in team work. Close relationship with the sponsor liaisons allows for the students to gain skills in professional conduct, management of tight schedule and a specified budget, and it well prepares the students to their engineering practice. Optical projects have their own sets of specific challenges, so it needs to be chosen properly to match the undergraduate skill sets such as those of HMC engineering students.

  4. Back translation reliability of TEOSQ in team game, individual game ...

    African Journals Online (AJOL)

    Back translation reliability of TEOSQ in team game, individual game and gender category. ... team and individual game with a specific focus to the dispositional approach on the athlete's performance in task and ... AJOL African Journals Online.

  5. When Teams Fail to Self-Regulate: Predictors and Outcomes of Team Procrastination Among Debating Teams.

    Science.gov (United States)

    Van Hooft, Edwin A J; Van Mierlo, Heleen

    2018-01-01

    Models of team development have indicated that teams typically engage in task delay during the first stages of the team's life cycle. An important question is to what extent this equally applies to all teams, or whether there is variation across teams in the amount of task delay. The present study introduces the concept of team procrastination as a lens through which we can examine whether teams collectively engage in unplanned, voluntary, and irrational delay of team tasks. Based on theory and research on self-regulation, team processes, and team motivation we developed a conceptual multilevel model of predictors and outcomes of team procrastination. In a sample of 209 student debating teams, we investigated whether and why teams engage in collective procrastination as a team, and what consequences team procrastination has in terms of team member well-being and team performance. The results supported the existence of team procrastination as a team-level construct that has some stability over time. The teams' composition in terms of individual-level trait procrastination, as well as the teams' motivational states (i.e., team learning goal orientation, team performance-approach goal orientation in interaction with team efficacy) predicted team procrastination. Team procrastination related positively to team members' stress levels, especially for those low on trait procrastination. Furthermore, team procrastination had an indirect negative relationship with team performance, through teams' collective stress levels. These findings add to the theoretical understanding of self-regulatory processes of teams, and highlight the practical importance of paying attention to team-level states and processes such as team goal orientation and team procrastination.

  6. A Practice-Centered Approach to Professional Development: Teacher-Librarian Collaboration in Capstone Projects

    Science.gov (United States)

    Harada, Violet H.

    2016-01-01

    This paper reports on a professional development initiative that targeted teams of teachers and librarians working with high school students on strengthening an inquiry approach to capstone projects. While much has been written about student-focused models for information search and use, little has been reported on how training for the…

  7. Alliance contract for offshore EPC projects; Acordos de alianca em projetos EPC para instalacoes offshore

    Energy Technology Data Exchange (ETDEWEB)

    Barbosa, Sergio Gil Sias; Barbosa, Fernando Sampaio [Odebrecht S.A. (Brazil)

    2004-07-01

    This paper has the objective of divulgation of the Alliance Agreements concepts in Brazil and to promote its practice amongst organizations with complimentary competencies for the execution of EPC offshore projects. These alliances were first adopted in the 80's as part of the outsourcing process in the industry in general and were adapted to suit EPC offshore projects on the North Sea in the 90's, to render feasible some projects that presented high level of prices and risks. The contractual modality of Alliance Agreements is characterized by an integrated project team composed by the best professionals of the client and the contractor. This team is responsible for the engineering, planning, estimation and risk analysis, matching both client's and contractor's viewpoints and needs, focusing on constructability, suitability for the purpose and cost effectiveness, aiming at having a project realized cost closer to the feasibility studies and creating a 'Win Win' type relationship for all partners involved. (author)

  8. Alliance contract for offshore EPC projects; Acordos de alianca em projetos EPC para instalacoes offshore

    Energy Technology Data Exchange (ETDEWEB)

    Barbosa, Sergio Gil Sias; Barbosa, Fernando Sampaio [Odebrecht S.A. (Brazil)

    2004-07-01

    This paper has the objective of divulgation of the Alliance Agreements concepts in Brazil and to promote its practice amongst organizations with complimentary competencies for the execution of EPC offshore projects. These alliances were first adopted in the 80's as part of the outsourcing process in the industry in general and were adapted to suit EPC offshore projects on the North Sea in the 90's, to render feasible some projects that presented high level of prices and risks. The contractual modality of Alliance Agreements is characterized by an integrated project team composed by the best professionals of the client and the contractor. This team is responsible for the engineering, planning, estimation and risk analysis, matching both client's and contractor's viewpoints and needs, focusing on constructability, suitability for the purpose and cost effectiveness, aiming at having a project realized cost closer to the feasibility studies and creating a 'Win Win' type relationship for all partners involved. (author)

  9. The importance of trust in virtual team knowledge mediation

    DEFF Research Database (Denmark)

    Petersen, Nils Braad

    2012-01-01

    For transnational companies, virtual project teams are a means of overcoming temporal, geographical and organizational boundaries between team members. However, because the level of knowledge communication has been shown to be influenced by trust (e.g. Staples & Webster 2008; Quigley, Tesluk, Locke......, and will examine how the corporate context, consisting of embedded cultures, corporate structures and orgamizational communities of practice (CoP) support relationships, identity, trust and knowledge communication. According to the literature review on virtual teams conducted by Martins, Gilson & Maynard (2004...

  10. Gathering, strategizing, motivating and celebrating: the team huddle in a teaching general practice.

    Science.gov (United States)

    Walsh, Allyn; Moore, Ainsley; Everson, Jennifer; DeCaire, Katharine

    2018-03-01

    To understand how implementing a daily team huddle affected the function of a complex interprofessional team including learners. A qualitative descriptive study using semi-structured interviews in focus groups. An academic general practice teaching practice. All members of one interprofessional team, including nurses, general practitioners, junior doctors, and support staff. Focus group interviews using semi-structured guidance were transcribed and the results analysed using qualitative content analysis. Four interrelated themes were identified: communication and knowledge sharing; efficiency of care; relationship and team building; and shared responsibility for team function. The implementation of the daily team huddle was seen by participants to enhance the collaboration within the team and to contribute to work life enjoyment. Participants perceived that problems were anticipated and solved quickly. Clinical updates and information about patients benefited the team including learners. Junior doctors quickly understood the scope of practice of other team members, but some felt reluctant to offer clinical opinions. The implementation of a daily team huddle was viewed as worthwhile by this large interprofessional general practice team. The delivery of patient care was more efficient, knowledge was readily distributed, and problem solving was shared across the team, including junior doctors.

  11. How transformational leadership works during team interactions: A behavioral process analysis

    OpenAIRE

    Lehmann-Willenbrock, N.K.; Meinecke, A.L.; Rowold, J.; Kauffeld, S.

    2015-01-01

    Transformational leadership is generally considered helpful for team functioning. However, the social dynamics underlying the benefits of transformational leadership remain elusive to date. To understand how and why transformational leadership can foster team functioning, this study focuses on leader-follower communication dynamics during team interactions. From the perspective of leadership as social problem solving, we argue that transformational leadership is linked to functional team prob...

  12. Team CANDU : ready for the marketplace

    International Nuclear Information System (INIS)

    Howieson, J.Q.

    2007-01-01

    This paper outlines the partnership between AECL and a number of leading global nuclear suppliers to market the Candu power reactor. The mission of the CANDU team is to develop market opportunities for CANDU technology and deliver successful CANDU projects

  13. PROJECT-DRIVEN SOFTWARE BUSINESS IN TRANSILVANIA - A CASE STUDY

    Directory of Open Access Journals (Sweden)

    Radu Marius

    2015-07-01

    Full Text Available The fairly low salaries of the IT workers compared to the Western countries, the skills and the location have supported outsourcing become one of the most competitive Romanian sectors. IT sector in Romania maintains a steady growth favoured by outsourcing companies. Moreover Romania is highly competitive when you take into account the level of technical proficiency and soft skills in the country. Romanian labour force can drive relevant projects even in small teams. This case study explores the realty of Romanian IT companies profiles. It presents in comparison two companies bases on organizational and strategic dimensions: project approach orientation, leadership, project value driven, and social responsibility. The corporate goal of the first company presented in the case study - Fortech - is to achieve the best adaptive organizational structure which can sustain its competitive advantage. This advantage results from combination of three main ingredients: scaled up human resource capital, versatile knowledge management and adaptability to customer needs. Fortech manages and administrates and execute their business activities using project management methodologies and practices in order to achieve the strategic goals. On the other hand Dolphin Kiss Company is a “Python boutique agency” created around a single contract and organized on a single project. The project was contracted with a top company from telecommunication industry. The company is a small team of creative software engineers focused on developing a very innovative software business solution. This case study is an empirical qualitative research intended to depict the main differences between two relevant company profiles present in the actual economic context: small team – results oriented – highly skilled VS large structure of outsourcing teams – matrix organized – customer oriented. The case study constructs a space for debates regarding the potential evolution of the

  14. Insights of health district managers on the implementation of primary health care outreach teams in Johannesburg, South Africa: a descriptive study with focus group discussions.

    Science.gov (United States)

    Moosa, Shabir; Derese, Anselme; Peersman, Wim

    2017-01-21

    Primary health care (PHC) outreach teams are part of a policy of PHC re-engineering in South Africa. It attempts to move the deployment of community health workers (CHWs) from vertical programmes into an integrated generalised team-based approach to care for defined populations in municipal wards. There has little evaluation of PHC outreach teams. Managers' insights are anecdotal. This is descriptive qualitative study with focus group discussions with health district managers of Johannesburg, the largest city in South Africa. This was conducted in a sequence of three meetings with questions around implementation, human resources, and integrated PHC teamwork. There was a thematic content analysis of validated transcripts using the framework method. There were two major themes: leadership-management challenges and human resource challenges. Whilst there was some positive sentiment, leadership-management challenges loomed large: poor leadership and planning with an under-resourced centralised approach, poor communications both within the service and with community, concerns with its impact on current services and resistance to change, and poor integration, both with other streams of PHC re-engineering and current district programmes. Discussion by managers on human resources was mostly on the plight of CHWs and calls for formalisation of CHWs functioning and training and nurse challenges with inappropriate planning and deployment of the team structure, with brief mention of the extended team. Whilst there is positive sentiment towards intent of the PHC outreach team, programme managers in Johannesburg were critical of management of the programme in their health district. Whilst the objective of PHC reform is people-centred health care, its implementation struggles with a centralising tendency amongst managers in the health service in South Africa. Managers in Johannesburg advocated for decentralisation. The implementation of PHC outreach teams is also limited by

  15. A Systematic Review of Tools Used to Assess Team Leadership in Health Care Action Teams.

    Science.gov (United States)

    Rosenman, Elizabeth D; Ilgen, Jonathan S; Shandro, Jamie R; Harper, Amy L; Fernandez, Rosemarie

    2015-10-01

    To summarize the characteristics of tools used to assess leadership in health care action (HCA) teams. HCA teams are interdisciplinary teams performing complex, critical tasks under high-pressure conditions. The authors conducted a systematic review of the PubMed/MEDLINE, CINAHL, ERIC, EMBASE, PsycINFO, and Web of Science databases, key journals, and review articles published through March 2012 for English-language articles that applied leadership assessment tools to HCA teams in all specialties. Pairs of reviewers assessed identified articles for inclusion and exclusion criteria and abstracted data on study characteristics, tool characteristics, and validity evidence. Of the 9,913 abstracts screened, 83 studies were included. They described 61 team leadership assessment tools. Forty-nine tools (80%) provided behaviors, skills, or characteristics to define leadership. Forty-four tools (72%) assessed leadership as one component of a larger assessment, 13 tools (21%) identified leadership as the primary focus of the assessment, and 4 (7%) assessed leadership style. Fifty-three studies (64%) assessed leadership at the team level; 29 (35%) did so at the individual level. Assessments of simulated (n = 55) and live (n = 30) patient care events were performed. Validity evidence included content validity (n = 75), internal structure (n = 61), relationship to other variables (n = 44), and response process (n = 15). Leadership assessment tools applied to HCA teams are heterogeneous in content and application. Comparisons between tools are limited by study variability. A systematic approach to team leadership tool development, evaluation, and implementation will strengthen understanding of this important competency.

  16. Program Development Plan and Team up; FINAL

    International Nuclear Information System (INIS)

    Solar Electric Power Association

    2001-01-01

    The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead

  17. Probing Aircraft Flight Test Hazard Mitigation for the Alternative Fuel Effects on Contrails and Cruise Emissions (ACCESS) Research Team . Volume 2; Appendices

    Science.gov (United States)

    Kelly, Michael J.

    2013-01-01

    The Alternative Fuel Effects on Contrails and Cruise Emissions (ACCESS) Project Integration Manager requested in July 2012 that the NASA Engineering and Safety Center (NESC) form a team to independently assess aircraft structural failure hazards associated with the ACCESS experiment and to identify potential flight test hazard mitigations to ensure flight safety. The ACCESS Project Integration Manager subsequently requested that the assessment scope be focused predominantly on structural failure risks to the aircraft empennage (horizontal and vertical tail). This report contains the Appendices to Volume I.

  18. Expert Meeting Report: Key Innovations for Adding Energy Efficiency to Maintenance Projects

    Energy Technology Data Exchange (ETDEWEB)

    Wood, A.; Wiehagen, J.

    2012-09-01

    This report describes an expert meeting hosted by the Building America research team NAHB Research Center, which was held on February 8, 2012, in Orlando, Florida. The topic, Key Innovations for Adding Energy Efficiency to Maintenance Projects, was intended to provide direction to more focused efforts to increase the efficiency of existing homes; in this meeting, the focus was specifically for re-roofing and the opportunities for adding energy efficiency upgrades during this major home repair activity.

  19. Focused Campaign Increases Activity among Participants in "Nature's Notebook," a Citizen Science Project

    Science.gov (United States)

    Crimmins, Theresa M.; Weltzin, Jake F.; Rosemartin, Alyssa H.; Surina, Echo M.; Marsh, Lee; Denny, Ellen G.

    2014-01-01

    Science projects, which engage non-professional scientists in one or more stages of scientific research, have been gaining popularity; yet maintaining participants' activity level over time remains a challenge. The objective of this study was to evaluate the potential for a short-term, focused campaign to increase participant activity in a…

  20. Project management approach for the Waste Area Grouping 6 Closure/Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1992-07-01

    This document has been developed as a preliminary definition of the Waste Area Grouping (WAG) 6 Closure Project Management Approach. The purpose of this document is to identify the roles and responsibilities of the various project team members and to identify the project scope, schedule and budget. This document is intended to be a living document. As information develops, this document will be revised to create a WAG 6 Project Management Plan (PMP). The PMP will provide additional focus to the information contained in this document. The information required will be available as the selected alternative for remediation of WAG 6 is approved and Remedial Action Plans are conceptualized. This document has been reviewed against, and is intended to be consistent with, the Environmental Restoration Program Management Plan