WorldWideScience

Sample records for project team conducted

  1. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  2. Virtual Project Teams

    DEFF Research Database (Denmark)

    Bjørn, Pernille

    technology in six real-life virtual teams, two in industry and four in education, applying interpretative research and action research methods. Two main lines of investigation are pursued: the first involves an examination of the organisational issues related to groupware adaptation in virtual project teams......, professional disciplines, time differences and technology. This thesis comprises a general introduction, referred to as the summary report, and seven research papers, which deal in detail with the results and findings of the empirical cases. The summary report provides a general introduction to the research......, while the second looks at the social context and practices of virtual project teams. Two of the key findings are 1) that the process of groupware adaptation by virtual project teams can be viewed as a process of expanding and aligning the technological frames of the participants, which includes mutual...

  3. East Tennessee State University's "Make a Difference" Project: Using a Team-Based Consultative Model To Conduct Functional Behavioral Assessments.

    Science.gov (United States)

    Vaughn, Kelley; Hales, Cindy; Bush, Marta; Fox, James

    1998-01-01

    Describes implementation of functional behavioral assessment (FBA) through collaboration between a university (East Tennessee State University) and the local school system. Discusses related issues such as factors in team training, team size, FBA adaptations, and replicability of the FBA team model. (Author/DB)

  4. Team work on international projects

    International Nuclear Information System (INIS)

    Hayfield, F.

    1983-01-01

    A successful team will result in Project efficiency and so lead to a better achievement of the Project objectives. Such a team will be self-motivating and have a high level of morale. An effective team will also create a better context for transfer of know-how and so better prepare its members for greater roles on future Project teams. The nature of Project work forces the process of team building to recognize several facts of life. A Project team can have a life as short as one year and as long as ten years. A team usually consists of people on temporary transfer from different departments yet retaining a link of some sort to their departments of origin. It may consist of members of one company only or of several as in a joint-venture and may include Client personnel. On International Projects, the members of a team may have different nationalities and be working in a language foreign to many of them. Many of the Project people may be expatriates to the Project area on a bachelor or on a married status well away from their head or usual office. Team building is a complex organizational and human process, with no mathematical formula for the ideal solution. It starts with the selection of the right Project Manager who should be a leader, a technocrat manager and an integrator all at the same time. The Project Manager must have the authority to create the organizational and human climate that will motivate to a maximum each member of the team. Each member must understand clearly his role and realize that this contribution to the Project will influence his career development. Loyalty to the Project Manager must be possible and the Departmental Manager has to recognize this necessity. This presentation will indicate the basic steps of a team building process on a typical major international Project

  5. Project team motyvation

    OpenAIRE

    Jasionis, Dominykas

    2016-01-01

    The term paper is to analyze the formation of the team and its - motyvation, and interviews from four different companies and find out the leaders in terms of your team, and what principle he tries to motivate her. The Tasks of this paper is to review the organization formed by a team; investigate the promotion of employees in enterprises; The four firms interviewed; Assess how you can work in different organizations. Methods used To analyze the topic, I decided to interview four different co...

  6. The Motivated Project Team

    Science.gov (United States)

    2009-12-01

    Financial incentives that match level of achievement • Regular, constructive feedback. Hierarchy of Needs ( Abraham H. Maslow ) Team members can be...Much has been written regarding motivational Defense AT&L: November-December 2009 58 theory . To further complicate mat- ters, some motivational... theories clearly contradict others, and a manager’s ability to motivate is, to no small degree, related to his or her leadership approach and inter

  7. Relationships among Team Trust, Team Cohesion, Team Satisfaction and Project Team Effectiveness as Perceived by Project Managers in Malaysia

    OpenAIRE

    Han-Ping Fung

    2014-01-01

    Today, more and more project teams are formed to achieve organizational objectives as organizations generally recognized the importance and benefits of project teams. There is a compelling reason to study what are the team outcome factors that can predict project team effectiveness as it is unclear whether these team outcome factors can yield the same result in project setting whereby there is resource and time constraint compare to normal work teams which are ongoing and operational in natur...

  8. First, build the project team

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, J.C. [Duke/Fluor Daniel, Charlotte, NC (United States)

    1997-03-01

    The EPC consortium of American, Japanese and Indonesian companies has been formed to construct the first phase of the coal-fired Paiton Power Project in Indonesia under a lump sum turnkey contract. A Consortium Agreement defines the respective roles, scope and responsibilities, as well as allocation of risks and rewards for each member. The roles of members have been assigned to match their experience and expertise and a Division of Responsibility document has been drawn up for each stage of the project. The management of the project depends on an effective team aligning the consortium members to a common set of project goals and objectives. Communication and understanding are all important. The project team have overcome some of the challenges of differences in culture, language, contractual practice and experience between the members. Some of the systems which are in place to minimise the effect of these differences and to focus on the execution of the project are outlined. (UK)

  9. Team dynamics in complex projects

    NARCIS (Netherlands)

    Oeij, P.; Vroome, E.E.M. de; Dhondt, S.; Gaspersz, J.B.R.

    2012-01-01

    Complexity of projects is hotly debated and a factor which affects innovativeness of team performance. Much attention in the past is paid to technical complexity and many issues are related to natural and physical sciences. A growing awareness of the importance of socioorganisational issues is

  10. DIPLOMA PROJECT TEAM WORK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    V. S. Kruglyk

    2014-04-01

    Full Text Available During the work performance students should get the maximal approach to the process of real project execution, so the project should include the need to use the latest technology, integration of data or services with different developments, architecture design, interaction of the team members and others. Implementation of graduation projects is the useful activity for the acquisition and consolidation of key IT competencies. Since the task of educational projects is maximal close to real one, students participate almost in all typical stages of commercial product’s development, and do so successfully. This is also confirmed practically: students, who were actively engaged in some projects at the university, have key positions in IT companies of the city and country after that. The main objective of the paper is to describe the organization of a common group students’ work on a degree project, implementation peculiarity of such projects, recommendations for improving the quality of projects. Thus, the paper is devoted to the peculiarities of the joint students’ work on a project during diploma execution in IT specialties, as the final part of the acquisition and consolidation process of key IT competencies of future programmers. The problem of choosing work topic, project concept, work organization in a group, implementation process organization has been considered. Also the specific stages of software development have been considered: development of interface, choice of technology, product quality, project disposal to the next developers, project completion.

  11. Perspectives on projects, project success and team work

    OpenAIRE

    Thompson, Karen

    2015-01-01

    This paper brings together perspectives on projects, project success and team work as a background to two graphical tools for considering project success and individual capabilities for working in a project team.

  12. Does team stability mediate the relationship between leadership and team learning? An empirical study among Dutch project teams

    NARCIS (Netherlands)

    Savelsbergh, Chantal M.J.H.; Poell, Rob F.; van der Heijden, Beatrice

    2014-01-01

    An exploratory field study was conducted among 30 project teams in the sectors of building and utilities, engineering and construction, infrastructure, and area decontamination and development in the Netherlands. It examined the influence of leadership on team learning behaviors and included team

  13. Does team stability mediate the relationship between leadership and team learning? : An empirical study among Dutch project teams

    NARCIS (Netherlands)

    Savelsbergh, C.; Poell, R.F.; van der Heijden, B.

    2015-01-01

    An exploratory field study was conducted among 30 project teams in the sectors of building and utilities, engineering and construction, infrastructure, and area decontamination and development in the Netherlands. It examined the influence of leadership on team learning behaviors and included team

  14. A Project Team: a Team or Just a Group?

    Directory of Open Access Journals (Sweden)

    Kateřina

    2014-06-01

    Full Text Available This paper deals with issues related to work in either teams or groups. The theoretical part discusses a team and a group with regards to its definition, classification and basic distinction, brings in more on the typology of team roles, personality assessment and sociometric methods. The analytical part tests the project (work team of a medical center represented in terms of personality and motivational types, team roles and interpersonal team relations concerning the willingness of cooperation and communication. The main objective of this work is to verify the validity of the assumptions that the analyzed team represents a very disparate group as for its composition from the perspective of personality types, types of motivation, team roles and interpersonal relations in terms of the willingness of cooperation and communication. A separate output shall focus on sociometric investigation of those team members where willingness to work together and communicate is based on the authors’ assumption of tight interdependence.

  15. Managing projects a team-based approach

    CERN Document Server

    Brown, Karen A

    2010-01-01

    Students today are likely to be assigned to project teams or to be project managers almost immediately in their first job. Managing Projects: A Team-Based Approach was written for a wide range of stakeholders, including project managers, project team members, support personnel, functional mangers who provide resources for projects, project customers (and customer representatives), project sponsors, project subcontractors, and anyone who plays a role in the project delivery process. The need for project management is on the rise as product life cycles compress, demand for IT systems increases, and business takes on an increasingly global character. This book adds to the project management knowledge base in a way that fills an unmet need—it shows how teams can apply many of the standard project management tools, as well as several tools that are relatively new to the field. Managing Projects: A Team-Based Approach offers the academic rigor found in most textbooks along with the practical attributes often foun...

  16. The Project Team: Features, Effectiveness and Leadership

    Directory of Open Access Journals (Sweden)

    Ramona-Elena GABREA

    2017-06-01

    Full Text Available The project team that is responsible for providing flexibility and innovation to this structure in order to enable organizations to remain successful (1. The very nature of the project team's work underpins a collective task much more complex than that assumed by other types of work teams. The aim of this paper is to explore the main factors that determine the project team effectiveness. The research methodology was the literature review. The main finding reveals that the organizational structure of projects and the project team should not be considered as a panacea for all problems of organizational effectiveness.

  17. Planning for high performance project teams

    International Nuclear Information System (INIS)

    Reed, W.; Keeney, J.; Westney, R.

    1997-01-01

    Both industry-wide research and corporate benchmarking studies confirm the significant savings in cost and time that result from early planning of a project. Amoco's Team Planning Workshop combines long-term strategic project planning and short-term tactical planning with team building to provide the basis for high performing project teams, better project planning, and effective implementation of the Amoco Common Process for managing projects

  18. A Project Team: A Team or Just a Group?

    Directory of Open Access Journals (Sweden)

    Katerina Hrazdilova Bockova

    2013-11-01

    Full Text Available This paper deals with issues related to work in either teams or groups. The theoretical part which discusses a team and a group with regards to its definition, classification and basic distinction brings in more on the typology of team roles, personality assessment and sociometric methods. The analytical part tests the project (work team of a medical center represented in terms of personality and motivational types, team roles and interpersonal team relations concerning the willingness of cooperation and communication. The main objective of this work was to determine whether the existing team is not by its nature rather a working group that contributes to the generally perceived stagnation of that field.

  19. Building Productivity in Virtual Project Teams

    Directory of Open Access Journals (Sweden)

    Bill Hamersly

    2015-04-01

    Full Text Available The steady increase in project failure rates is leaving businesses searching for better integration techniques to virtualize their project environments. Through virtualization, organizations may have positive impacts on communities across geographical boundaries and resource constraints. The focus of this phenomenological study was to explore, via the experiences of successful project management practitioners, best practice strategies for integrating virtual project teams through data analysis. The conceptual framework included von Bertalanffy’s general systems theory, decomposition model of business process and project management frameworks, and the recomposition approach. Twenty-two senior project managers with more than 5 years of experience managing virtual project environments participated in semistructured telephone interviews. The van Kaam process employing normalization and bracketing approaches in data analysis resulted in the emergence of 34 thematic categories. The 10 most common themes culminated in the identification of strategies relevant for virtual project teams. The major themes pertained to 3 broad areas: (a structure that accommodates skills and technology for virtual team success, (b governance leading to efficient virtual project team management, and (c collaboration practices across diverse environments. This study involved the exploration of the experiences of the participants. Using the van Kaam method for normalization of the data and clustering like experiences into thematic statements, the study provided a plethora of new information concentrated on 10 themes that emerged.

  20. Managing teams performing complex innovation projects

    NARCIS (Netherlands)

    Oeij, P.R.A.; Vroome, E.M.M. de; Dhondt, S.; Gaspersz, J.B.R.

    2012-01-01

    Complexity of projects is hotly debated and a factor which affects innovativeness of team performance. Much attention in the past is paid to technical complexity and many issues are related to natural and physical sciences. A growing awareness of the importance of socio-organisational issues is

  1. LEADERSHIP AS A FACTOR FOR BUILDING A PROJECT TEAM

    Directory of Open Access Journals (Sweden)

    Marina Grynchenko

    2018-03-01

    . Results. The clear goal setting and system use of efficient methods of building a project team are critical for professional training specialists in the sphere of project management. The development of relevant skills should be combined with the intentional development of students’ leadership potential. The adequate organization of teaching behavioural competences plays a special part and the clear practical orientation of conducting lectures and seminars using active teaching methods are of primary importance. Conclusions. First, the prevalence of command methods and forms of activity in project management significantly enhances the importance of the membership of the project team and the nature of the relations among the participants. Secondly, the effective formation of the team requires that the leader have the relevant knowledge and skills, strategic thinking, psychological culture and the ability to assess the professional competence of candidates and their significant professional and social personal qualities. Third, the leader should use a clear system of motivation and incentives to build a project team and organize the teamwork.

  2. Team Research at the Biology-Mathematics Interface: Project Management Perspectives

    Science.gov (United States)

    Milton, John G.; Radunskaya, Ami E.; Lee, Arthur H.; de Pillis, Lisette G.; Bartlett, Diana F.

    2010-01-01

    The success of interdisciplinary research teams depends largely upon skills related to team performance. We evaluated student and team performance for undergraduate biology and mathematics students who participated in summer research projects conducted in off-campus laboratories. The student teams were composed of a student with a mathematics…

  3. Team and Project Work in Engineering Practices

    Directory of Open Access Journals (Sweden)

    Anders Buch

    2015-11-01

    Full Text Available In this article, we investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals. The article investigates how professional engineering practices are enacted in two engineering consultancy companies in Denmark where teamwork has been or is an ideal for organizing work. Through a practice-based lens, the article sets out to investigate, firstly, how discourses about team and project work affect engineering work practices; secondly, how technologymediated management is reconciled in teamwork practices; and thirdly, how team and project work affect engineering professionalism and collaborative work practices. A practice theoretical framework informs the analysis. Teamwork is investigated as a phenomenon enacted through the sayings, doings and relatings of practitioners in landscapes of practices and the interconnectedness of the practices is traced through the setup of specific ecologies in the sites.

  4. A Team Building Model for Software Engineering Courses Term Projects

    Science.gov (United States)

    Sahin, Yasar Guneri

    2011-01-01

    This paper proposes a new model for team building, which enables teachers to build coherent teams rapidly and fairly for the term projects of software engineering courses. Moreover, the model can also be used to build teams for any type of project, if the team member candidates are students, or if they are inexperienced on a certain subject. The…

  5. Creating a Realistic Context for Team Projects in HCI

    NARCIS (Netherlands)

    Koppelman, Herman; van Dijk, Betsy

    2006-01-01

    Team projects are nowadays common practice in HCI education. This paper focuses on the role of clients and users in team projects in introductory HCI courses. In order to provide projects with a realistic context we invite people from industry to serve as clients for the student teams. Some of them

  6. 33 CFR 385.17 - Project Delivery Team.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Delivery Team. 385.17... Processes § 385.17 Project Delivery Team. (a) In accordance with the procedures of the Corps of Engineers...,” the Corps of Engineers and the non-Federal sponsor shall form a Project Delivery Team to develop the...

  7. An Interdisciplinary Team Project: Psychology and Computer Science Students Create Online Cognitive Tasks

    Science.gov (United States)

    Flannery, Kathleen A.; Malita, Mihaela

    2014-01-01

    We present our case study of an interdisciplinary team project for students taking either a psychology or computer science (CS) course. The project required psychology and CS students to combine their knowledge and skills to create an online cognitive task. Each interdisciplinary project team included two psychology students who conducted library…

  8. Team- and project work in engineering practices

    DEFF Research Database (Denmark)

    Buch, Anders; Andersen, Vibeke

    2015-01-01

    in teamwork practices, and, thirdly, how team- and project work affect engineering professionalism and collaborative work practices. A practice theoretical framework informs the analysis. Teamwork is investigated as a phenomenon enacted through the sayings, doings and relatings of practitioners in landscapes......In this paper we investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals. The paper investigates how professional engineering practices are enacted in two engineering...... consultancy companies in Denmark where teamwork has been or is an ideal for organizing work. Through a practice-based lens the article sets out to investigate, firstly, how discourses about teamand project work affect engineering work practices, secondly, how technology-mediated management is reconciled...

  9. Defensive behaviours in innovation teams: how project teams discuss defensiveness and its relationship with innovation resilience behaviour and project success

    NARCIS (Netherlands)

    Oeij, P.R.A.; Dhondt, S.; Gaspersz, J.B.R.; Vuuren, T. van

    2016-01-01

    Project team members and project leaders of innovation projects were interviewed about the possible presence of defensive behaviours within the team. While investigating defensive behaviour can be done validly by observation techniques, to talk about defensiveness within a team often leads to

  10. Knowledge management in design teams using a project website

    OpenAIRE

    Otter, den, A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for sharing of knowledge in such teams are hard to change and better systems are difficult to implement for various reasons. Sharing of knowledge in such teams is important for collective understanding of ...

  11. Team effectiveness in Non-Governmental Organizations (NGOs) projects.

    Science.gov (United States)

    Latif, Khawaja Fawad; Williams, Nigel

    2017-10-01

    The incorporation of team context into research and practice regarding team effectiveness in NGOs projects is a constant challenge. The research seeks to address the gap and identify the critical determinants of team effectiveness in projects undertaken by non-governmental organizations. Using a systematic process, the study involved both literature and focus group discussions to generate the required items. A total of 157 respondents (Team Members and Team Leaders) were part of the study that filled the questionnaires. Using exploratory factor analysis followed by confirmatory factor analysis, both convergent and discriminant validity was established. The present study found that team effectiveness in NGO social projects has a total of seven dimensions namely: Inter team coordination, community social linkage, team performance, knowledge, skills, and attitudes, leadership communication and engagement, decision making and information sharing, and team formation. There is a significant lack of research on team effectiveness in NGO projects. Where considerably large proportion of research on team effectiveness has focused on the corporate sector, the non-governmental teams have been neglected. This study clearly highlights the determinants that make up team effectiveness in NGOs. The determinants identified will help to specifically look at the effectiveness of teams in NGO projects. The study would help NGOs identify the dimensions in which they may be performing in a weaker manner and direct their energies in improving the factors. Copyright © 2017 Elsevier Ltd. All rights reserved.

  12. Software Engineering Team Project - lessons learned

    Directory of Open Access Journals (Sweden)

    Bogumiła Hnatkowska

    2013-06-01

    Full Text Available In the 2010/11 academic year the Institute of Informatics at Wroclaw University of Technology issued ’Software Engineering Team Project’ as a course being a part of the final exam to earn bachelor’s degree. The main assumption about the course was that it should simulate the real environment (a virtual IT company for its participants. The course was aimed to introduce issues regarding programming in the medium scale, project planning and management. It was a real challenge as the course was offered for more than 140 students. The number of staff members involved in its preparation and performance was more than 15. The paper presents the lessons learned from the first course edition as well as more detailed qualitative and quantitative course assessment.

  13. Exploring leadership in self-managed project teams in Malaysia

    Directory of Open Access Journals (Sweden)

    Zaleha Yazid

    2015-01-01

    Full Text Available This paper focuses on a longitudinal approach in exploring leadership in Self-Managed Project Teams (SMPT. SMPT has been known to contribute to organizations by improving productivity and increasing organizational performance. Therefore, understanding the dynamics of leadership in this type of team can be seen as one of the important factors to ensure the success of organizations. Leading a team which manages itself is a challenge as increased autonomy and control is given to the team which eliminates the existence of a leader. It is important to understand the extent of how the external leader is involved within SMPT and whether the external leader approaches highlighted in the literature are applicable in such a situation and how these approaches change during work processes. This study comprises of evidence collected through semi-structured interviews in two small and medium sized organizations in Malaysia. Weekly telephone interviews as well as face-to-face interviews were conducted which provides contextual data for the research. In this research, the evidence suggested that SMPT transform from self-managed toward leader-managed resulting from several factors, such as conflict handling strategies. Specifically, it was found that avoiding conflicts, rather than confronting, transform the team into being leader dependent.

  14. Effects of interdependencies in project teams

    NARCIS (Netherlands)

    Van der Vegt, G.S.; Emans, B.J.M.; Van de Vliert, E.

    The associations between task interdependence, outcome interdependence, and the effectiveness of team members were examined. The sample consisted of 181 employees at 10 engineering companies in The Netherlands. The participants evaluated their interdependence with 1 specific team member and rated

  15. Knowledge management in design teams using a project website

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for

  16. Team self-regulation and meeting deadlines in project teams: antecedents and effects of temporal consensus

    NARCIS (Netherlands)

    Gevers, J.M.P.; van Eerde, W.; Rutte, C.G.

    2009-01-01

    In a longitudinal study among 48 project teams, we investigated how temporal consensus (i.e., the extent to which team members have a shared understanding of the temporal aspects of their collective task) affects the ability of teams to establish coordinated action and meet deadlines. In addition,

  17. Sourcing Team Behavior in Project-Based MNE's

    DEFF Research Database (Denmark)

    Hansen, Anders Peder Lysholm

    2014-01-01

    across the three cases was characterized by conflict between departments represented in the category teams. This resulted in unfortunate sourcing team behaviour and unaligned performance management, which in turn had a number of adverse effects. Further research on how to create a holistic and balanced......This paper presents and discusses a multiple case study of three cross-functional category teams responsible for sourcing critical components within multi-national, project-based enterprises. The study focused on behaviour and management of the sourcing teams and found that the sourcing process...... team perspective in the sourcing teams is suggested....

  18. Team research at the biology-mathematics interface: project management perspectives.

    Science.gov (United States)

    Milton, John G; Radunskaya, Ami E; Lee, Arthur H; de Pillis, Lisette G; Bartlett, Diana F

    2010-01-01

    The success of interdisciplinary research teams depends largely upon skills related to team performance. We evaluated student and team performance for undergraduate biology and mathematics students who participated in summer research projects conducted in off-campus laboratories. The student teams were composed of a student with a mathematics background and an experimentally oriented biology student. The team mentors typically ranked the students' performance very good to excellent over a range of attributes that included creativity and ability to conduct independent research. However, the research teams experienced problems meeting prespecified deadlines due to poor time and project management skills. Because time and project management skills can be readily taught and moreover typically reflect good research practices, simple modifications should be made to undergraduate curricula so that the promise of initiatives, such as MATH-BIO 2010, can be implemented.

  19. Distributed team cohesion – not an oxymoron. The impact of information and communications technologies on teamness in globally distributed IT projects

    Directory of Open Access Journals (Sweden)

    Olga Stawnicza

    2015-01-01

    Full Text Available Globally distributed IT projects are common practice in today’s globalized world. Typically, project team members’ work on interdependent tasks, with a common goal to be achieved as one team. However, being split between multiple locations impedes communication among team members and hampers the development of trust. Information and communications media enable communication between geographically distributed project team members and help to create and maintain trust within project units. Communication and trust are particularly significant for fostering a feeling of oneness among project team members. Oneness, also referred to as “teamness”, is repeatedly mentioned as one of the challenges facing global project teams. However, prior literature on teamness is very scarce and its importance is underrepresented. This research contributes to the field in two ways. First, the theoretical study based on a systematic literature review examines available evidence of teamness in globally distributed projects. Secondly, an empirical study based on interviews conducted with global project managers fills the current gap in literature on the link between use of ICT and establishing a sense of team unity. This paper draws practitioners’ attention to the importance of striving for teamness in spite of the geographical distance that exists between project team members.

  20. Students’ Team Project Experiences and Their Attitudes Towards Teamwork

    OpenAIRE

    Aleksandra Rudawska

    2017-01-01

    Purpose: The aim of the study is to evaluate the influence of team project experiences of students (presence and role of a leader; fairness in team projects; conditions supporting teamwork created by a university) on their attitudes towards teamwork, especially the perception of teamwork effectiveness and the preference of working in teams. Methodology: In the study the quantitative research was done among master degree Polish students of Management (105 questionnaires). The measures used f...

  1. Interdisciplinary collaboration within project-level NEPA teams in the US Forest Service

    Science.gov (United States)

    James W. Freeman; Marc J. Stern; Michael Mortimer; Dale J. Blahna; Lee K. Cerveny

    2011-01-01

    Interdisciplinary teamwork has become a foundation of natural resources planning and management in the US. Yet, we know little about the degree of interdisciplinary collaboration of natural resource planning teams. We conducted 10 case studies of Forest Service NEPA (National Environmental Policy Act) teams working on projects related to the 2005 Travel Management Rule...

  2. Student-Led Project Teams: Significance of Regulation Strategies in High- and Low-Performing Teams

    Science.gov (United States)

    Ainsworth, Judith

    2016-01-01

    We studied group and individual co-regulatory and self-regulatory strategies of self-managed student project teams using data from intragroup peer evaluations and a postproject survey. We found that high team performers shared their research and knowledge with others, collaborated to advise and give constructive criticism, and demonstrated moral…

  3. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  4. Dream Team - A pregraduate surgical talent development project

    DEFF Research Database (Denmark)

    Jensen, Rune Dall; Seyer-Hansen, Mikkel; Christensen, Mette Krogh

    Dream Team is an extracurricular pregraduate surgical talent development project founded in 2009 at Aarhus University Hospital, Denmark. It aims to identify and develop laparoscopic surgical talents during medical school. Dream Team contains two parts: 1) a weeklong boot camp where app. 10 % of 8th...... the mentorship the students will be in operation room at least once a week and participate as much as their skills allow. Dream Team differs from similar pregraduate programs as it selects the most talented students, but does the boot camp select the best and does the mentorship program provide optimal learning......? A PhD project aims to critically analyze and develop Dream Team. The PhD project is based on theories about deliberate practice[1] and social learning[2]. In addition, we compare surgical talent development[3][4] with talent development in elite sport in order to inspire, refine and develop Dream Team...

  5. Students’ Team Project Experiences and Their Attitudes Towards Teamwork

    Directory of Open Access Journals (Sweden)

    Aleksandra Rudawska

    2017-03-01

    Full Text Available Purpose: The aim of the study is to evaluate the influence of team project experiences of students (presence and role of a leader; fairness in team projects; conditions supporting teamwork created by a university on their attitudes towards teamwork, especially the perception of teamwork effectiveness and the preference of working in teams. Methodology: In the study the quantitative research was done among master degree Polish students of Management (105 questionnaires. The measures used for the study were developed specifcally for the study referring to the previous research in the feld. Findings: Results indicate that leaders in team projects and conditions supporting teamwork are connected with the students’ perception of teamwork effectiveness, while the fairness in team projects is connected with students’ preference of working collectively. Research implications: We conclude that in order to develop a positive attitude towards teamwork, the teamwork projects should be better supported by the instructors (especially supporting the emergence of leader(s and minimising the problem of free riders and the university should create a climate that facilitates teamworking, otherwise team projects might negatively influence students’ attitude towards collective work. Value: On the labour market the teamwork skills are one of the most important skills of employees, as the team-based organizational designs are becoming the norm in work organization. The study is contributing to the understanding of the relations between student experiences and their attitudes as well as the role played by high education in the development of these attitudes. Some previous research in Anglo-Saxon culture countries indicate that team project assignments realised by students during studies might even hinder their attitudes to teamwork and their willingness to work in teams in the future.

  6. Involving youth with disabilities in the development and evaluation of a new advocacy training: Project TEAM.

    Science.gov (United States)

    Kramer, Jessica; Barth, Yishai; Curtis, Katie; Livingston, Kit; O'Neil, Madeline; Smith, Zach; Vallier, Samantha; Wolfe, Ashley

    2013-04-01

    This paper describes a participatory research process in which six youth with disabilities (Youth Panel) participated in the development and evaluation of a manualized advocacy training, Project TEAM (Teens making Environment and Activity Modifications). Project TEAM teaches youth with disabilities how to identify environmental barriers, generate solutions, and request accommodations. The Youth Panel conducted their evaluation after the university researcher implemented Project TEAM with three groups of trainees. The Youth Panel designed and administered a survey and focus group to evaluate enjoyment and usefulness of Project TEAM with support from an advocate/researcher. Members of the Youth Panel analyzed survey response frequencies. The advocate/researcher conducted a content analysis of the open-ended responses. Sixteen of 21 Project TEAM trainees participated in the evaluation. The evaluation results suggest that the trainees found the interactive and individualized aspects of the Project TEAM most enjoyable and useful. Some instructional materials were difficult for trainees with cognitive disabilities to understand. The Youth Panel's involvement in the development of Project TEAM may explain the relatively positive experiences reported by trainees. Project TEAM should continue to provide trainees with the opportunity to apply concepts in real-life situations. Project TEAM requires revisions to ensure it is enjoyable and useful for youth with a variety of disabilities. • Group process strategies, picture-based data collection materials, peer teamwork, and mentorship from adults with disabilities can enable youth with disabilities to engage in research. • Collaborating with youth with disabilities in the development of new rehabilitation approaches may enhance the relevance of interventions for other youth with disabilities. • Youth with cognitive disabilities participating in advocacy and environment-focused interventions may prefer interactive and

  7. Cultural Issue and its Influence in the Management of Global Project Teams

    Directory of Open Access Journals (Sweden)

    Nadia Lima

    2016-04-01

    Full Text Available The interactions between the project manager and team members may be affected by several variables, such as culture, leadership style of the project manager, and the complexity of the developed tasks. Focused in this context, the objective of this paper is to investigate and describe how the culture issue can affect the anagement of global project teams. It is a qualitative, descriptive study conducted in a large multinational company in the automotive sector. The results of this research show that cultural issues can influence both positively and negatively the management of project global teams and the managers of these projects have to deal with several management challenges that require the adoption of certain ways of dealing with culture impacts in managing their teams to minimize potential problems in this context.

  8. Management Guidelines for Database Developers' Teams in Software Development Projects

    Science.gov (United States)

    Rusu, Lazar; Lin, Yifeng; Hodosi, Georg

    Worldwide job market for database developers (DBDs) is continually increasing in last several years. In some companies, DBDs are organized as a special team (DBDs team) to support other projects and roles. As a new role, the DBDs team is facing a major problem that there are not any management guidelines for them. The team manager does not know which kinds of tasks should be assigned to this team and what practices should be used during DBDs work. Therefore in this paper we have developed a set of management guidelines, which includes 8 fundamental tasks and 17 practices from software development process, by using two methodologies Capability Maturity Model (CMM) and agile software development in particular Scrum in order to improve the DBDs team work. Moreover the management guidelines developed here has been complemented with practices from authors' experience in this area and has been evaluated in the case of a software company. The management guidelines for DBD teams presented in this paper could be very usefully for other companies too that are using a DBDs team and could contribute towards an increase of the efficiency of these teams in their work on software development projects.

  9. Intercultural team maturity model: Unity, diversity, capability. Achieving optimal performance when leading \\ud a multicultural project team

    OpenAIRE

    Prabhakar, G. P.; Walker, S.

    2005-01-01

    Our research helps to judge ‘maturity’ as an asset to projects and heightens awareness of situational leadership, using intercultural team maturity levels as a tool for optimal project leadership success.\\ud \\ud This study focuses on exactly how to analyse the team members’ ability to adapt to complex intercultural project environments, using an intercultural team maturity model.

  10. Team role stress : relationships with team learning and performance in project teams

    NARCIS (Netherlands)

    Savelsbergh, C.; Gevers, J.M.P.; Heijden, van der B.I.J.M.; Poell, R.F.

    2012-01-01

    Although role stress literature has almost exclusively focused on individual role incumbents, it is conceivable that shared conditions of ambiguity, conflict, and quantitative or qualitative overload may give rise to a collective experience of role stress in teams. Testing a multilevel mediation

  11. Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode

    Science.gov (United States)

    Zhang, L.; Li, Y.; Wu, Q.

    2013-05-01

    Integrated Project Delivery (IPD) is a newly-developed project delivery approach for construction projects, and the level of collaboration of project management team is crucial to the success of its implementation. Existing research has shown that collaborative satisfaction is one of the key indicators of team collaboration. By reviewing the literature on team collaborative satisfaction and taking into consideration the characteristics of IPD projects, this paper summarizes the factors that influence collaborative satisfaction of IPD project management team. Based on these factors, this research develops a fuzzy linguistic method to effectively evaluate the level of team collaborative satisfaction, in which the authors adopted the 2-tuple linguistic variables and 2-tuple linguistic hybrid average operators to enhance the objectivity and accuracy of the evaluation. The paper demonstrates the practicality and effectiveness of the method through carrying out a case study with the method.

  12. Progress report on recommendations of the Flaring Project Team

    International Nuclear Information System (INIS)

    Macken, C.

    1999-01-01

    Part of the mandate of the Clean Air Strategic Alliance (CASA) is to share decision-making responsibility for air quality management with the government of Alberta, through the ministries of Environmental Protection, Energy, and Health, and the Alberta Energy and Utilities Board (EUB). CASA's vision for air quality in Alberta is that 'the air will be odourless, tasteless, look clear, and have no measurable short- or long-term adverse effects on people, animals, or the environment'. In 1997, CASA approved the establishment of the Flaring Project Team in response to public concern about potential and observed impacts associated with flaring of solution gas. Members of that team established a framework for the management of solution gas flaring. Their long-term goal is to eliminate routine flaring of solution gas. The Project Team assessed existing information on solution gas flaring, including technologies, efficiencies, emissions and impacts. Alternative technologies were also reviewed along with biological and health effects of solution gas flaring. A list of data gaps and research needs was compiled in order to help with the development of the Team's recommendations. The Team's final report was delivered in June 1998. It was recommended that the following policy objective hierarchy be used to guide decisions related to routine solution gas flaring: (1) eliminate routine solution gas flaring, (2) reduce volumes of gas flared, and (3) improve the efficiency of flares. By way of progress the Project Team was able to report that in March, 1999, the EUB issued a draft interim directive to address upstream petroleum industry flaring. The draft Directive incorporates the recommendations from the CASA Flaring Project Team with respect to management of solution gas flaring. In December 1998, changes to the royalty structure to encourage the productive use of flare gas have been announced by the Alberta Department of Energy and Alberta Environmental protection, thus

  13. [Dream Team--a pre-graduate surgical talent development project].

    Science.gov (United States)

    Jensen, Rune Dall; Christensen, Mette Krogh; Seyer-Hansen, Mikkel

    2014-08-04

    In 2009 surgeons from Aarhus University Hospital founded an extracurricular talent development project based on a skill-acquisition training programme for medical students at Aarhus University. The training program, named Dream Team, provides medical students with the opportunity to pursue a career in surgery. This paper presents and discusses the organizational and pedagogical framework of the concept Dream Team, as well as the results from two inquiries: a survey and an exploratory observational study. The inquiries were conducted in summer 2013.

  14. Experiences with Designing a Team Project Module for Teaching Teamwork to Students

    OpenAIRE

    Bieliková, Mária

    2005-01-01

    Team projects play an important role in the education of engineers. This paper describes a team project module (called Team project) that is part of a postgraduate course in Informatics. Its main objective is to give students a hands-on experience with different aspects of working in team on a problem. We discuss several aspects that should be considered in designing such module as a part of a curriculum: team formation, team communication, team assessment, problem statement and assignment, d...

  15. A new approach to cost effective projects: High performance project teams

    International Nuclear Information System (INIS)

    Chambers, N.C.

    1994-01-01

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  16. A new approach to cost effective projects: High performance project teams

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, N.C. [Brown and Root Energy Services (United Kingdom)

    1994-12-31

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  17. Occupational emerging risks affecting international virtual project Team Results

    Directory of Open Access Journals (Sweden)

    Dumitraşcu-Băldău Iulia

    2017-01-01

    Full Text Available The expansion of internet access, high-speed connection services, collaborative work platforms and tools, allowed employees to interact virtually offering companies the possibility to develop projects around the world, reducing operational costs and gain competitive advantage. Realizing the advantages and disadvantages of developing a project team in an international virtual work environment, requires adopting specific strategies to construct an effective team and ensure the project success. One of the most important disadvantages that we identified is that the new work environment brings new risks for both team members and managers. So, it becomes mandatory to identify and analyze the occupational emerging risks and their impact on the productivity of virtual team members, in order to prevent them efficiently and to ensure the safety and health of employees in a virtual working environment. This paper aims to highlight the necessity for project managers and organizations, to include in their specific project strategies, an efficient occupational risks management in the virtual workplace, to obtain a continuously improved virtual working environment, so to achieve a high performance from virtual employees.

  18. Adaptation of Agile Project Management Methodology for Project Team

    Directory of Open Access Journals (Sweden)

    Rasnacis Arturs

    2015-12-01

    Full Text Available A project management methodology that defines basic processes, tools, techniques, methods, resources and procedures used to manage a project is necessary for effective and successful IT project management. Each company needs to define its own methodology or adapt some of the existing ones. The purpose of the research is to evaluate the possibilities of adapting IT project development methodology according to the company, company employee characteristics and their mutual relations. The adaptation process will be illustrated with a case study at an IT company in Latvia where the developed methodology is based on Agile Scrum, one of the most widespread Agile methods.

  19. Successful project teams (in R&D environment)

    CSIR Research Space (South Africa)

    Giesler, Achmed

    2011-09-01

    Full Text Available management tools no longer give project teams a competitive edge - additional qualitative tools are required, following a systems approach. A paradigm shift away from the traditional triangle of budget, brief and time towards a stronger focus on people issues...

  20. Designing and Conducting Health Systems Research Projects ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Home · Resources · Publications. Designing and Conducting Health Systems Research Projects Volume 1: Proposal Development and Fieldwork ... IDRC and the United Kingdom's Global AMR Innovation Fund—managed by the ... New website will help record vital life events to improve access to services for all.

  1. Bridges and Barriers to Developing and Conducting Interdisciplinary Graduate-Student Team Research

    Directory of Open Access Journals (Sweden)

    Wayde Cameron. Morse

    2007-12-01

    Full Text Available Understanding complex socio-environmental problems requires specialists from multiple disciplines to integrate research efforts. Programs such as the National Science Foundation's Integrative Graduate Education and Research Traineeship facilitate integrated research efforts and change the way academic institutions train future leaders and scientists. The University of Idaho and the Tropical Agricultural Research and Higher Education Center in Costa Rica collaborate on a joint research program focusing on biodiversity conservation and sustainable production in fragmented landscapes. We first present a spectrum of integration ranging from disciplinary to transdisciplinary across seven aspects of the research process. We then describe our experiences and lessons learned conducting interdisciplinary graduate student team research. Using our program as a case study, we examine the individual, disciplinary, and programmatic bridges and barriers to conducting interdisciplinary research that emerged during our student team research projects. We conclude with a set of recommendations for exploiting the bridges and overcoming the barriers to conducting interdisciplinary research, especially as part of graduate education programs.

  2. Conduct of operations training - An innovative approach to team building

    International Nuclear Information System (INIS)

    Widen, W.C.; Kurth, W.; Broccolo, A.

    1987-01-01

    The conduct of nuclear power plant operations is a key parameter for station management and regulators alike. Indeed, the basic methods and demeanor in which operating crews approach overall plant operations is perhaps the principal factor leading to safe and efficient operations. Hence, Commonwealth Edison's Zion Station has initiated an innovative and positive training program designed to increase operator awareness of conducting station operations in an attentive, diligent, and conscientious manner. This Conduct of Operations Training Program is a collaborative joint effort between Commonwealth Edison and the Westinghouse Nuclear Training Center. In particular, the key managers of Zion's operating department brainstormed various philosophies and strategies with senior training staff members of the Westinghouse Nuclear Training Center. The outcome of these sessions has formed the skeleton of an intensified, one-day Conduct of Operations course. Several unique aspects of this innovative course are described

  3. Barriers and Solutions to Conducting Large International, Interdisciplinary Research Projects

    Science.gov (United States)

    Pischke, Erin C.; Knowlton, Jessie L.; Phifer, Colin C.; Gutierrez Lopez, Jose; Propato, Tamara S.; Eastmond, Amarella; de Souza, Tatiana Martins; Kuhlberg, Mark; Picasso Risso, Valentin; Veron, Santiago R.; Garcia, Carlos; Chiappe, Marta; Halvorsen, Kathleen E.

    2017-12-01

    Global environmental problems such as climate change are not bounded by national borders or scientific disciplines, and therefore require international, interdisciplinary teamwork to develop understandings of their causes and solutions. Interdisciplinary scientific work is difficult enough, but these challenges are often magnified when teams also work across national boundaries. The literature on the challenges of interdisciplinary research is extensive. However, research on international, interdisciplinary teams is nearly non-existent. Our objective is to fill this gap by reporting on results from a study of a large interdisciplinary, international National Science Foundation Partnerships for International Research and Education (NSF-PIRE) research project across the Americas. We administered a structured questionnaire to team members about challenges they faced while working together across disciplines and outside of their home countries in Argentina, Brazil, and Mexico. Analysis of the responses indicated five major types of barriers to conducting interdisciplinary, international research: integration, language, fieldwork logistics, personnel and relationships, and time commitment. We discuss the causes and recommended solutions to the most common barriers. Our findings can help other interdisciplinary, international research teams anticipate challenges, and develop effective solutions to minimize the negative impacts of these barriers to their research.

  4. Barriers and Solutions to Conducting Large International, Interdisciplinary Research Projects.

    Science.gov (United States)

    Pischke, Erin C; Knowlton, Jessie L; Phifer, Colin C; Gutierrez Lopez, Jose; Propato, Tamara S; Eastmond, Amarella; de Souza, Tatiana Martins; Kuhlberg, Mark; Picasso Risso, Valentin; Veron, Santiago R; Garcia, Carlos; Chiappe, Marta; Halvorsen, Kathleen E

    2017-12-01

    Global environmental problems such as climate change are not bounded by national borders or scientific disciplines, and therefore require international, interdisciplinary teamwork to develop understandings of their causes and solutions. Interdisciplinary scientific work is difficult enough, but these challenges are often magnified when teams also work across national boundaries. The literature on the challenges of interdisciplinary research is extensive. However, research on international, interdisciplinary teams is nearly non-existent. Our objective is to fill this gap by reporting on results from a study of a large interdisciplinary, international National Science Foundation Partnerships for International Research and Education (NSF-PIRE) research project across the Americas. We administered a structured questionnaire to team members about challenges they faced while working together across disciplines and outside of their home countries in Argentina, Brazil, and Mexico. Analysis of the responses indicated five major types of barriers to conducting interdisciplinary, international research: integration, language, fieldwork logistics, personnel and relationships, and time commitment. We discuss the causes and recommended solutions to the most common barriers. Our findings can help other interdisciplinary, international research teams anticipate challenges, and develop effective solutions to minimize the negative impacts of these barriers to their research.

  5. The Use of Virtual Project Teams for Project Management in Jordanian Corporations

    Directory of Open Access Journals (Sweden)

    Belal Hashem Alnsour

    2014-09-01

    Full Text Available Jordanian companies need virtual project teams that can use advanced technology to solve problems and make specialist multi perspective decisions when working across different and distance location. The main mission of the team is to make decisions through interdependent specialists and perspectives. In terms of its use and application, the virtual project team is a difficult challenge for Jordan corporations. This study aims to explore such applications and to detect which factors face virtual project teams in the Jordanian situation. The author focused on how to explore and gain a deeper understanding from a virtual team’s perspective, and team members’ opinions of the factors in the organization that support or hinder the mission. More specifically, this research sought to discover precisely which factors in an organization support virtual project teams, and how they can develop a support system which enables their work in an Arab environment. The main objective was to identify the effects of all factors on the efficiency of virtual teams. The research used empirical case studies from three Jordanian corporations in the communication sector which operate in a high-tech environment, and used surveys to collect data. Structured interviews with both management and team members during the study discovered that the use of virtual teams within Jordanian companies is still limited, and detected that the main factors which hinder their development in many corporations is the level of trust in the ability of virtual teams, together with the high level of centralized decision making in Jordanian corporations. Additionally, communication and coordination affect the execution of work processes and methods for virtual teams, together with a general weakness which exists in terms of infrastructure, resources and technology within the corporation, which then impacts on the efficiency of virtual team work.

  6. IAEA inspection team conducting investigation in South Korea

    International Nuclear Information System (INIS)

    2004-01-01

    Full text: On 23 August 2004, during discussions about the initial declarations of the Republic of Korea (ROK) under the Additional Protocol to its Safeguards Agreement, the ROK informed the IAEA that it had enriched nuclear material in the course of atomic vapour laser isotope separation (AVLIS) experiments that had not been declared to the IAEA. The ROK informed the IAEA that these experiments had been on a laboratory scale and involved the production of only milligram quantities of enriched uranium. According to the ROK, these activities were carried out without the Government's knowledge at a nuclear site in Korea in 2000, and that the activities had been terminated. Following receipt of this information, the IAEA dispatched a team of inspectors, headed by the Director of the Safeguards Operations Division responsible for the ROK, to investigate further all relevant aspects of this matter. The inspectors will report to the Director General upon their return to Vienna early next week. The Director General will be informing the Board of Governors of the IAEA's initial findings at the next meeting of the Board of Governors beginning on 13 September 2004. (IAEA)

  7. Energy Efficiency Performance in Refurbishment Projects with Design Team Attributes As A Mediator: A Pilot Study

    Science.gov (United States)

    Sekak, Siti Nor Azniza Ahmad; Rahmat Dr, Ismail, Prof.; Yunus, Julitta; Saád, Sri Rahayu Mohd; Hanafi Azman Ong, Mohd

    2017-12-01

    The Energy Efficiency (EE) plays an important role over the building life cycle and the implementation of EE in refurbishment projects has a significant potential towards the reduction of greenhouse gas emissions. However, the involvement of the design team at the early stage of the refurbishment projects will determine the success of EE implementations. Thus, a pilot study was conducted at the initial stage of the data collection process of this research to validate and verify the questionnaires.

  8. CERN's IT Consultancy Team: a new IT project support service

    CERN Multimedia

    Ignacio Reguero, IT Department

    2016-01-01

    Newly created IT Consultancy Team provides advice on IT matters to communities at CERN starting new projects or reviewing computing activities of old.   The members of CERN's IT Consultancy Team. The consultants share their knowledge and experience to improve awareness of the IT landscape at CERN and to advise on system architecture and design to ensure best usage of existing IT services and solutions that favour, and are compatible with, the infrastructure already in place. They also help to formalise requirements and assess impact on security, software licenses and cost, especially where contacts among different services are needed and questions go beyond the current computing service offerings. For instance, the IT consultants may help answering questions like the ones below: We are starting with project X – how could we make its computing aspects compatible with the CERN IT infrastructure? E.g. if you need a web content management system favour Drupal instead of Wor...

  9. Teaching supply chain management through global projects with global project teams

    NARCIS (Netherlands)

    Kopczak, L.R.; Fransoo, J.C.

    2000-01-01

    In this article, we describe the Global Project Coordination Course, a course in which project teams composed of three students from each of two overseas universities execute company-sponsored projects dealing with global supply chain management issues. The $75,000 to $100,00 contributed in total by

  10. Targeting relationally integrated project teams for sustainable PPPs

    OpenAIRE

    Kumaraswamy, M. M.; Ling, F. Y. Y.; Anvuur, A. M.; Rahman, M. M.

    2007-01-01

    Purpose – This paper targets the development of comprehensive approaches to prequalifying teams for Public Private Partnerships (PPPs). Design/methodology/approach – Research outcomes from a study into “relationally integrated project teams” (RIPTs) were applied to necessarily longer-term PPP scenarios. A force field model was developed to visualise the importance of stronger relational forces between the many PPP participants for “sustainable RIPTs” (SRITs). A framework was conceptualised to...

  11. NORSTAR Project: Norfolk public schools student team for acoustical research

    Science.gov (United States)

    Fortunato, Ronald C.

    1987-01-01

    Development of the NORSTAR (Norfolk Public Student Team for Acoustical Research) Project includes the definition, design, fabrication, testing, analysis, and publishing the results of an acoustical experiment. The student-run program is based on a space flight organization similar to the Viking Project. The experiment will measure the scattering transfer of momentum from a sound field to spheres in a liquid medium. It is hoped that the experimental results will shed light on a difficult physics problem - the difference in scattering cross section (the overall effect of the sound wave scattering) for solid spheres and hollow spheres of differing wall thicknesses.

  12. Assistant professor Andrea Wittenborn, research team conduct clinical trial to treat couples' depression, marital problems

    OpenAIRE

    Micale, Barbara L.

    2010-01-01

    Andrea Wittenborn, assistant professor, human development, is heading a research team conducting the Strengthening Bonds Couples Therapy Study to treat depression and marital problems (dyadic distress) in married/committed couple relationships.

  13. Towards Integrated Team Practice: A Case of Malaysian Industrialised Building System (IBS Construction Projects

    Directory of Open Access Journals (Sweden)

    Mohd Nawi Mohd Nasrun

    2014-01-01

    Full Text Available Problems associated with fragmentation in the traditional construction process, such as isolation of professionals, lack of co-ordination between design and construction, and the sequential manner of its processes, has impacted on construction performance leading to a lack of integration, wastage, low productivity and efficiency. Integrated team practice is perceived as paramount. Unfortunately, there has a limitation of study focus on the dimension of fully integrated team especially for Malaysian Industrialised Building System (IBS projects. Accordingly, this research paper explores and identifies the dimension of fully integrated team from the traditional approach and conduct a validation process for implementing it in Malaysian IBS projects. The research presented uses interviews case study to obtain qualitative data. It was found that the dimension of fully integrated team from the traditional construction process could apply to the Malaysian IBS projects. Suggestions on how an integrated team practice in IBS design and construction process in order to minimise the fragmentation gaps will be concluded.

  14. Can teams benefit from using a mindful infrastructure when defensive behaviour threatens complex innovation projects?

    NARCIS (Netherlands)

    Oeij, P.R.A.; Dhondt, S.; Gaspersz, J.B.R.; Vroome, E.M.M. de

    2016-01-01

    Projects are often doomed to fail. An explorative case study which carried out team-based complex innovation projects in a research and technology organisation suggests three main results. 1] Project team leaders experienced that the complexity involved in the various aspects of team functioning,

  15. A multilevel study of the impact of project manager's leadership on extra-role performance of project team members

    Science.gov (United States)

    Shokory, Suzyanty Mohd; Suradi, Nur Riza Mohd

    2018-04-01

    The current study examines the impact of transformational and transactional leadership of project manager on the extra-role performance of project team members. In addition, this study also identifies factor dominant to extra-role performance of project team members when the transformational and transactional leadership of project managers are analyzed simultaneously. The study involved 175 of project team members from 35 project teams (each project team consists of different contracting companies registered in the Selangor (N = 175 from 35 contractors company). A multilevel analysis with hierarchical linear modeling (HLM) approach was used in this study. The analysis showed that transformational and transactional leadership of the project manager is a positive significant with extra-role performance project team members when analyzed separately. However when the two constructs (transformational leadership and transactional leadership of project manager) were analyzed simultaneously, transformational leadership was found to have more impact on extra-role performance project team members compared to transactional leadership. These findings explained that although transformational and transactional leadership of project managers can improve extra-role performance project team members, but this study has proved that transformational leadership of project managers affect extra-role performance project team members more as compared to transactional leadership.

  16. Computer incident response and forensics team management conducting a successful incident response

    CERN Document Server

    Johnson, Leighton

    2013-01-01

    Computer Incident Response and Forensics Team Management provides security professionals with a complete handbook of computer incident response from the perspective of forensics team management. This unique approach teaches readers the concepts and principles they need to conduct a successful incident response investigation, ensuring that proven policies and procedures are established and followed by all team members. Leighton R. Johnson III describes the processes within an incident response event and shows the crucial importance of skillful forensics team management, including when and where the transition to forensics investigation should occur during an incident response event. The book also provides discussions of key incident response components. Provides readers with a complete handbook on computer incident response from the perspective of forensics team management Identify the key steps to completing a successful computer incident response investigation Defines the qualities necessary to become a succ...

  17. The One Plan Project: A cooperative effort of the National Response Team and the Region 6 Regional Response Team to simplify facility emergency response planning

    International Nuclear Information System (INIS)

    Staves, J.; McCormick, K.

    1997-01-01

    The National Response Team (NRT) in coordination with the Region 6 Response Team (RRT) have developed a facility contingency plan format which would integrate all existing regulatory requirements for contingency planning. This format was developed by a multi-agency team, chaired by the USEPA Region 6, in conjunction with various industry, labor, and public interest groups. The impetus for this project came through the USEPA Office of Chemical Emergency Preparedness and Prevention (CEPPO). The current national oil and hazardous material emergency preparedness and response system is an amalgam of federal, state, local, and industrial programs which are often poorly coordinated. In a cooperative effort with the NRT, the CEPPO conducted a Presidential Review of federal agency authorities and coordination responsibilities regarding release prevention, mitigation, and response. Review recommendations led to a Pilot Project in USEPA Region 6. The Region 6 Pilot Project targeted end users in the intensely industrialized Houston Ship Channel (HSC) area, which is comprised of petroleum and petrochemical companies

  18. Change Management for using a Project Website in Design Team Communication

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Emitt, S.; Prins, M.

    2005-01-01

    A Project Website (PWS) has been advocated as an important tool for design teams of construction projects, because the tool is supposed to greatly enhance team communication. This, finally, should result in improved team performance in terms of increase of efficiency and effectiveness. PWS vendors

  19. Leadership and organizational tenure diversity as determinants of project team effectiveness

    NARCIS (Netherlands)

    de Poel, Frouke M.; Stoker, Janka I.; Van der Zee, Karen I.

    2014-01-01

    The present study reveals how leadership effectiveness in project teams is dependent on the level of organizational tenure diversity. Data from 34 project teams showed that transformational leadership is related to organizational commitment, creative behavior, and job satisfaction, but only in teams

  20. Leadership and Organizational Tenure Diversity as Determinants of Project Team Effectiveness

    NARCIS (Netherlands)

    de Poel, Frouke M.; Stoker, Janka I.; Van der Zee, Karen I.

    2014-01-01

    The present study reveals how leadership effectiveness in project teams is dependent on the level of organizational tenure diversity. Data from 34 project teams showed that transformational leadership is related to organizational commitment, creative behavior, and job satisfaction, but only in teams

  1. Defining Projects to Integrate Evolving Team Fundamentals and Project Management Skills

    Science.gov (United States)

    Smith, Harold, III; Smarkusky, Debra; Corrigall, Elizabeth

    2008-01-01

    Industry has indicated the desire for academic programs to produce graduates that are well-versed in collaborative problem solving and general project management concepts in addition to technical skills. The primary focus of a curriculum is typically centered on the technical training with minimal attention given to coalescing team and project…

  2. TEAM.

    Science.gov (United States)

    National Highway Traffic Safety Administration (DOT), Washington, DC.

    This document presents materials covering the television campaign against drunk driving called "TEAM" (Techniques for Effective Alcohol Management). It is noted that TEAM's purpose is to promote effective alcohol management in public facilities and other establishments that serve alcoholic beverages. TEAM sponsors are listed, including…

  3. Uncovering Transdisciplinary Team Project Outcomes through Ripple Effect Mapping

    Science.gov (United States)

    Daniels, Catherine H.; Chalker-Scott, Linda; Martini, Nicole

    2016-01-01

    The Garden Team at Washington State University is a transdisciplinary, geographically dispersed group of faculty and staff. As with many such teams, member retention requires effort, as busy individuals may not see the overall benefits of active team membership. Ripple effect mapping is a strategy that can illustrate the tangible and often…

  4. Investigating the Linkage between Intrinsic Motivation and Project Team Satisfaction in Undergraduate Agricultural Leadership Students

    Science.gov (United States)

    Lamm, Kevan W.; Carter, Hannah S.; Melendez, Marcus W.

    2014-01-01

    Organizations have increased the amount of work that is completed by project teams over the past several decades. This trend is projected to continue into the foreseeable future. In response to this trend, the academic community has increased the number of project team based learning experiences for students in classes. The challenge has been that…

  5. Problem-Based Service Learning: The Evolution of a Team Project

    Science.gov (United States)

    Connor-Greene, Patricia A.

    2002-01-01

    In this article, I describe the evolution of a problem-based service learning project in an undergraduate Abnormal Psychology course. Students worked in teams on a semester-long project to locate and evaluate information and treatment for specific psychiatric disorders. As part of the project, each team selected relevant bibliographic materials,…

  6. Formal and informal computer mediated communication within within design teams for complex building projects

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Gray, C.; Prins, M.

    2001-01-01

    In this paper the information environment of design teams is discussed because of the use of Internet based Project websites (PWS) to improve the information exchange within design teams. Because design teams heavenly depend on informal information exchange and PWS is a tool for formalising

  7. Project Leader's Dual Socialization and Its Impact on Team Learning and Performance: A Diagnostic Study

    Science.gov (United States)

    Gautam, Tanvi

    2009-01-01

    One of the important challenges for leadership in project teams is the ability to manage the knowledge, communication and coordination related activities of team. In cross-team collaboration, different boundaries contribute to the situated nature of knowledge and hamper the flow of knowledge and prevent shared understanding with those on the other…

  8. Analysis of Return on Investment in Different Types of Agile Software Development Project Teams

    Directory of Open Access Journals (Sweden)

    Goran MILANOV

    2012-01-01

    Full Text Available This exploratory study of IT project teams in Serbia investigates how the choice of agile methods in different development project teams affects the return-on-investment (ROI. In this paper different types of software project teams are analyzed in order to examine and identify the business-value of using agile methods. In various software development project teams, the ROI of agile methods is yet to be fully explored, while the ROI of traditional methods is well-understood. Since ROI is important indicator of the projects success, in this paper we examine the factors that influence the ROI both from software solution customer point of view, and different agile project teams.

  9. Resilient behaviour in innovation teams for better project results

    NARCIS (Netherlands)

    Oeij, P.R.A.

    2017-01-01

    Extenden abstract. Organising in a mindful way is a central aspect to making innovation teams become more resilient and enahnce their chances of innovation success. Such organising, called mindful infrastructure, implies creating the right conditions for teams to excel. Four elements are crucial to

  10. Toward a model of socializing project team members : An integrative approach

    NARCIS (Netherlands)

    Batistič, S.; Kenda, R.

    2018-01-01

    Project work is becoming more and more important in everyday business, as is staffing the right newcomers for the project. Recognizing that not all new project team workers possess equally important specific knowledge, skills and abilities for the success of projects, we draw on project management,

  11. Managing Project Team in Local Government B.A. Amujiri Abstract ...

    African Journals Online (AJOL)

    Religion Dept

    government and discovered that managing project team is indispensable in local governments .... subordinate; improve employee motivation; improve communication between .... or events required in completing the project. This will help to.

  12. Asian Tracer Experiment and Atmospheric Modeling (TEAM) Project: Draft Field Work Plan for the Asian Long-Range Tracer Experiment

    Energy Technology Data Exchange (ETDEWEB)

    Allwine, K Jerry; Flaherty, Julia E.

    2007-08-01

    This report provides an experimental plan for a proposed Asian long-range tracer study as part of the international Tracer Experiment and Atmospheric Modeling (TEAM) Project. The TEAM partners are China, Japan, South Korea and the United States. Optimal times of year to conduct the study, meteorological measurements needed, proposed tracer release locations, proposed tracer sampling locations and the proposed durations of tracer releases and subsequent sampling are given. Also given are the activities necessary to prepare for the study and the schedule for completing the preparation activities leading to conducting the actual field operations. This report is intended to provide the TEAM members with the information necessary for planning and conducting the Asian long-range tracer study. The experimental plan is proposed, at this time, to describe the efforts necessary to conduct the Asian long-range tracer study, and the plan will undoubtedly be revised and refined as the planning goes forward over the next year.

  13. Using an Undergraduate Materials Research Project to Foster Multidisciplinary Teaming Skills

    Science.gov (United States)

    Newell, James A.; Cleary, Doug D.

    2004-01-01

    This paper describes the use of undergraduate materials multidisciplinary research projects as a means of addressing the growing industrial demand for graduates experienced in working in multidisciplinary teams. It includes a detailed description of a project in which a multidisciplinary team of chemical engineering and civil engineering students…

  14. An Empirical Study of Hospitality Management Student Attitudes toward Group Projects: Instructional Factors and Team Problems

    Science.gov (United States)

    Choi, Youngsoo; Ro, Heejung

    2012-01-01

    The development of positive attitudes in team-based work is important in management education. This study investigates hospitality students' attitudes toward group projects by examining instructional factors and team problems. Specifically, we examine how the students' perceptions of project appropriateness, instructors' support, and evaluation…

  15. The Trust Project - Symbiotic Human Machine Teams: Social Cueing for Trust and Reliance

    Science.gov (United States)

    2016-06-30

    AFRL-RH-WP-TR-2016-0096 THE TRUST PROJECT - SYMBIOTIC HUMAN-MACHINE TEAMS: SOCIAL CUEING FOR TRUST & RELIANCE Susan Rivers, Monika Lohani, Marissa...30 JUN 2012 – 30 JUN 2016 4. TITLE AND SUBTITLE THE TRUST PROJECT - SYMBIOTIC HUMAN-MACHINE TEAMS: SOCIAL CUEING FOR TRUST & RELIANCE 5a. CONTRACT

  16. Development of a team-based framework for conducting self-assessment of Continuous Improvement

    DEFF Research Database (Denmark)

    Jørgensen, Frances; Gertsen, Frank; Boer, Harry

    2004-01-01

    The study presented in this article is based on two basic premises. First, successful continuous improvement (CI) is dependent on shop floor level involvement and participation in improvement efforts. Second, the term "self-assessment" clearly implies that those whose performance is being measured......, and who are involved in conducting the assessment process. Excerpts from longitudinal case studies in a single Danish manufacturing organization demonstrate how teams involved in the process of conducting self-assessment of CI developed a better understanding of the basic principles of CI. Furthermore...

  17. Team-Based Learning for Nursing and Medical Students: Focus Group Results From an Interprofessional Education Project.

    Science.gov (United States)

    Feather, Rebecca A; Carr, Doug E; Reising, Deanna L; Garletts, Derrick M

    2016-01-01

    Past research indicates that inadequacies in health care delivery create substantial preventable quality issues that can be addressed through improving relationships among clinicians to decrease the negative effects on patient outcomes. The purpose of this article is to describe the implementation of an interprofessional education project with senior nursing and third-year medical students working in teams in a clinical setting. Results include data from focus groups conducted at the conclusion of the project.

  18. Conducting a team-based multi-sited focused ethnography in primary care.

    Science.gov (United States)

    Bikker, A P; Atherton, H; Brant, H; Porqueddu, T; Campbell, J L; Gibson, A; McKinstry, B; Salisbury, C; Ziebland, S

    2017-09-12

    Focused ethnography is an applied and pragmatic form of ethnography that explores a specific social phenomenon as it occurs in everyday life. Based on the literature a problem-focused research question is formulated before the data collection. The data generation process targets key informants and situations so that relevant results on the pre-defined topic can be obtained within a relatively short time-span. As part of a theory based evaluation of alternative forms of consultation (such as video, phone and email) in primary care we used the focused ethnographic method in a multisite study in general practice across the UK. To date there is a gap in the literature on using focused ethnography in healthcare research.The aim of the paper is to build on the various methodological approaches in health services research by presenting the challenges and benefits we encountered whilst conducing a focused ethnography in British primary care. Our considerations are clustered under three headings: constructing a shared understanding, dividing the tasks within the team, and the functioning of the focused ethnographers within the broader multi-disciplinary team.As a result of using this approach we experienced several advantages, like the ability to collect focused data in several settings simultaneously within in a short time-span. Also, the sharing of experiences and interpretations between the researchers contributed to a more holistic understanding of the research topic. However, mechanisms need to be in place to facilitate and synthesise the observations, guide the analysis, and to ensure that all researchers feel engaged. Reflection, trust and flexibility among the team members were crucial to successfully adopt a team focused ethnographic approach. When used for policy focussed applied healthcare research a team-based multi-sited focused ethnography can uncover practices and understandings that would not be apparent through surveys or interviews alone. If conducted with

  19. Conducting a team-based multi-sited focused ethnography in primary care

    Directory of Open Access Journals (Sweden)

    A.P. Bikker

    2017-09-01

    Full Text Available Abstract Focused ethnography is an applied and pragmatic form of ethnography that explores a specific social phenomenon as it occurs in everyday life. Based on the literature a problem-focused research question is formulated before the data collection. The data generation process targets key informants and situations so that relevant results on the pre-defined topic can be obtained within a relatively short time-span. As part of a theory based evaluation of alternative forms of consultation (such as video, phone and email in primary care we used the focused ethnographic method in a multisite study in general practice across the UK. To date there is a gap in the literature on using focused ethnography in healthcare research. The aim of the paper is to build on the various methodological approaches in health services research by presenting the challenges and benefits we encountered whilst conducing a focused ethnography in British primary care. Our considerations are clustered under three headings: constructing a shared understanding, dividing the tasks within the team, and the functioning of the focused ethnographers within the broader multi-disciplinary team. As a result of using this approach we experienced several advantages, like the ability to collect focused data in several settings simultaneously within in a short time-span. Also, the sharing of experiences and interpretations between the researchers contributed to a more holistic understanding of the research topic. However, mechanisms need to be in place to facilitate and synthesise the observations, guide the analysis, and to ensure that all researchers feel engaged. Reflection, trust and flexibility among the team members were crucial to successfully adopt a team focused ethnographic approach. When used for policy focussed applied healthcare research a team-based multi-sited focused ethnography can uncover practices and understandings that would not be apparent through surveys or

  20. Translational Science Project Team Managers: Qualitative Insights and Implications from Current and Previous Postdoctoral Experiences.

    Science.gov (United States)

    Wooten, Kevin C; Dann, Sara M; Finnerty, Celeste C; Kotarba, Joseph A

    2014-07-01

    The development of leadership and project management skills is increasingly important to the evolution of translational science and team-based endeavors. Team science is dependent upon individuals at various stages in their careers, inclusive of postdocs. Data from case histories, as well as from interviews with current and former postdocs, and those supervising postdocs, indicate six essential tasks required of project managers in multidisciplinary translational teams, along with eight skill-related themes critical to their success. To optimize the opportunities available and to ensure sequential development of team project management skills, a life cycle model for the development of translational team skills is proposed, ranging from graduate trainees, postdocs, assistant professors, and finally to mature scientists. Specific goals, challenges and project management roles and tasks are recommended for each stage for the life cycle.

  1. Are We Ready to Go Live with Our Team Projects?

    Directory of Open Access Journals (Sweden)

    Janice Whatley

    2016-05-01

    Over the three years that the Live Projects have been running, feedback indicates that the students gain employability skills from the projects, and the organisations involved develop links with the university and benefit from output from the projects. A number of suggestions for improving the administration of the Live Projects were suggested, such as providing clients with information on timescales and providing students with more guidance on managing the projects.

  2. A Project Team Analysis Using Tuckman's Model of Small-Group Development.

    Science.gov (United States)

    Natvig, Deborah; Stark, Nancy L

    2016-12-01

    Concerns about equitable workloads for nursing faculty have been well documented, yet a standardized system for workload management does not exist. A project team was challenged to establish an academic workload management system when two dissimilar universities were consolidated. Tuckman's model of small-group development was used as the framework for the analysis of processes and effectiveness of a workload project team. Agendas, notes, and meeting minutes were used as the primary sources of information. Analysis revealed the challenges the team encountered. Utilization of a team charter was an effective tool in guiding the team to become a highly productive group. Lessons learned from the analysis are discussed. Guiding a diverse group into a highly productive team is complex. The use of Tuckman's model of small-group development provided a systematic mechanism to review and understand group processes and tasks. [J Nurs Educ. 2016;55(12):675-681.]. Copyright 2016, SLACK Incorporated.

  3. A Quantitative Study of Global Software Development Teams, Requirements, and Software Projects

    Science.gov (United States)

    Parker, Linda L.

    2016-01-01

    The study explored the relationship between global software development teams, effective software requirements, and stakeholders' perception of successful software development projects within the field of information technology management. It examined the critical relationship between Global Software Development (GSD) teams creating effective…

  4. uCollaborator: Framework for STEM Project Collaboration among Geographically-Dispersed Student/Faculty Teams

    Science.gov (United States)

    Fiore, Stephen M.; Rodriguez, Walter E.; Carstens, Deborah S.

    2012-01-01

    This paper presents a framework for facilitating communication among STEM project teams that are geographically dispersed in synchronous or asynchronous online courses. The framework has been developed to: (a) improve how engineering and technology students and faculty work with collocated and geographically-dispersed teams; and (b) to connect the…

  5. How the nuclear safety team conducts emergency exercises at the IEA-R1 reactor

    International Nuclear Information System (INIS)

    Vaz, Antonio C.A.; Silva, Davilson G.; Toyoda, Eduardo Y.; Santia, Paulo S.; Conti, Thadeu N.; Semmler, Renato; Carvalho, Ricardo N.

    2015-01-01

    This work introduces the Diagram of Emergency Exercise Coordination designed by the Nuclear Safety Team for better Emergency Exercise coordination. The Nuclear Safety Team was created with the mission of avoiding, preventing and mitigating the causes and effects of accidents at the IEA-R1. The facility where we conduct our work is located in an area of a huge population, what increases the responsibility of our mission: conducting exercises and training are part of our daily activities. During the Emergency Exercise, accidents ranked 0-4 on INES (International Nuclear Events Scale) are simulated and involve: Police Department, Fire Department, workers, people from the community, and others. In the last exercise held in June 2014, the scenario contemplated a terrorist organization action that infiltrated in a group of students who were visiting the IEA-R1, tried to steal fresh fuel element to fabricate a dirty bomb. Emergency procedures and plans, timeline and metrics of the actions were applied to the Emergency Exercise evaluation. The next exercise will be held in November, with the simulation of the piping of the primary cooling circuit rupture, causing the emptying of the pool and the lack of cooling of the fuel elements in the reactor core: this will be the scenario. The skills acquired and the systems improvement have been very important tools for the reactor operation safety and the Nuclear Safety Team is making technical efforts so that these Emergency Exercises may be applied to other nuclear and radiological facilities. Equally important for the process of improving nuclear safety is the emphasis placed on implementing quality improvements to the human factor in the nuclear safety area, a crucial element that is often not considered by those outside the nuclear sector. Surely, the Diagram of Emergency Exercise Coordination application will improve and facilitate the organization, coordination and evaluation tasks. (author)

  6. How the nuclear safety team conducts emergency exercises at the IEA-R1 reactor

    Energy Technology Data Exchange (ETDEWEB)

    Vaz, Antonio C.A.; Silva, Davilson G.; Toyoda, Eduardo Y.; Santia, Paulo S.; Conti, Thadeu N.; Semmler, Renato; Carvalho, Ricardo N., E-mail: acavaz@ipen.br, E-mail: dgsilva@ipen.br, E-mail: eytoyoda@ipen.br, E-mail: psantia@ipen.br, E-mail: tnconti@ipen.br, E-mail: rsemmler@ipen.b, E-mail: rncarval@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2015-07-01

    This work introduces the Diagram of Emergency Exercise Coordination designed by the Nuclear Safety Team for better Emergency Exercise coordination. The Nuclear Safety Team was created with the mission of avoiding, preventing and mitigating the causes and effects of accidents at the IEA-R1. The facility where we conduct our work is located in an area of a huge population, what increases the responsibility of our mission: conducting exercises and training are part of our daily activities. During the Emergency Exercise, accidents ranked 0-4 on INES (International Nuclear Events Scale) are simulated and involve: Police Department, Fire Department, workers, people from the community, and others. In the last exercise held in June 2014, the scenario contemplated a terrorist organization action that infiltrated in a group of students who were visiting the IEA-R1, tried to steal fresh fuel element to fabricate a dirty bomb. Emergency procedures and plans, timeline and metrics of the actions were applied to the Emergency Exercise evaluation. The next exercise will be held in November, with the simulation of the piping of the primary cooling circuit rupture, causing the emptying of the pool and the lack of cooling of the fuel elements in the reactor core: this will be the scenario. The skills acquired and the systems improvement have been very important tools for the reactor operation safety and the Nuclear Safety Team is making technical efforts so that these Emergency Exercises may be applied to other nuclear and radiological facilities. Equally important for the process of improving nuclear safety is the emphasis placed on implementing quality improvements to the human factor in the nuclear safety area, a crucial element that is often not considered by those outside the nuclear sector. Surely, the Diagram of Emergency Exercise Coordination application will improve and facilitate the organization, coordination and evaluation tasks. (author)

  7. Code of Conduct for wind-power projects - Phase 3

    International Nuclear Information System (INIS)

    Strub, P.; Ziegler, Ch.

    2008-11-01

    This paper discusses the results of phase three of a project concerning wind-power projects. Feasibility and strategy aspects are examined and discussed. The current state of the wind power market is discussed on the basis of the results of a survey made on the subject. The social acceptance of wind power installations is discussed, whereby the rejection of particular projects is compared with a general lack of acceptance. Requirements placed on such projects and possible solutions are discussed. Finally, the feasibility of setting up a code of conduct in the area of wind-power projects is discussed and the definition of further instruments is examined

  8. A Team Formation Framework for Managing Diversity in Multidisciplinary Engineering Project

    Directory of Open Access Journals (Sweden)

    Shawqi Mohammed Hossain

    2017-02-01

    Full Text Available Team formation is one of the essential elements in constructing effective teamwork of any team size that requires different skill sets. Diversity in team encourages students to challenge and compete with one another while searching for new ideas, which in turn can lead to a better team performance. In a well-functioning diverse teams, the students who performed poorly may gain benefit by observing how excellent students approach the assignments. They may also benefit by getting advice and assistance from the excellent students. Studies have shown that Malaysian university graduates lack of team skills. The purpose of this paper is to propose a framework for forming a diverse multidisciplinary team among engineering undergraduates based on selected criteria such as individual personality type, gender, and other relevant demographic information. The proposed framework can also be used to design an automated team-formation system based on the identified metrics. The purpose of the framework is to consolidate the existing team formation literature, and to develop and test interventions for maximizing individual member and team performance as a whole that makes an effective team. For this study, a multidisciplinary approach was used where first year engineering students from three different faculties, namely Faculty of Electrical Engineering (FKE, Faculty of Mechanical Engineering (FKM, and Faculty of Biosciences and Medical Engineering (FBME at Universiti Teknologi Malaysia (UTM worked on an innovation project using the Conceive, Design, Implement, and Operate (CDIO framework. Keirsey Temperament Sorter was used as an instrument to identify an individual's personality type.

  9. The Automated Assembly Team contributions to the APRIMED Agile Manufacturing Project

    International Nuclear Information System (INIS)

    Jones, R.E.; Ames, A.L.; Calton, T.L.

    1995-06-01

    The Automated Assembly Team of the APRIMED Project (abbreviated as A') consists of two parts: the Archimedes Project, which is an ongoing project developing automated assembly technology, and the A' Robot Team. Archimedes is a second generation assembly planning system that both provides a general high-level assembly sequencing capability and, for a smaller class of products, facilitates automatic programming of a robotic workcell to assemble them. The A' robot team designed, developed, and implemented a flexible robot workcell which served as the automated factory of the A' project. In this document we briefly describe the role of automated assembly planning in agile manufacturing, and specifically describe the contributions of the Archimedes project and the A' robot team to the A' project. We introduce the concepts of the Archimedes automated assembly planning project, and discuss the enhancements to Archimedes which were developed in response to the needs of the A' project. We also present the work of the A' robot team in designing and developing the A' robot workcell, including all tooling and programming to support assembly of the A' discriminator devices. Finally, we discuss the process changes which these technologies have enabled in the A' project

  10. Methodology Proposal for Increasing Swift Trust within Virtual Teams in the Inception Phase of a Project Life-Cycle: Project Manager’s Perspective

    Directory of Open Access Journals (Sweden)

    Milovanović Bojan Morić

    2015-12-01

    Full Text Available This paper proposes team building methodology for project managers in virtual teams as means to develop swift trust between new team members in the inception phase of the project life cycle. Proposed methodology encompasses activities within the first three days after the team formation and proposes the measuring tools for monitoring and managing trust development within the project team. Aim of this paper is to provide new insights to various decision makers potentially interested in increasing the performance of project teams operating in virtual environment, such as: investors, business owners and project managers working in virtual environment.

  11. A GUIDE TO RECOMMENDATIONS FOR WORKING WITH VIRTUAL TEAMS ON PROJECTS GUIDED BY PMI

    Directory of Open Access Journals (Sweden)

    Maíra Paschoalino Fernandes Bahia

    2017-12-01

    Full Text Available Due the demand of markets to be more competitive in search of immediate results, reach high quality and low cost, the companies are seeking alternatives to have more quality, minimize the cost and speed up the time in a project. One example is work with a model of teams called virtual teams. In order to identify bottlenecks and difficulties encountered in this team model to minimize the risk of failures in a project, this study applied a survey to professionals of various nationalities with experience working with virtual teams based in projects guided by PMI good practices. At the end of this study was possible to quantify and relate the main problems listed by these professionals, which prevented them from completing the projects on time, cost and quality desired. Thus for each of the points mentioned it was suggested some recommendations for the application of tools and techniques most suitable in this context.

  12. Leadership Styles: Perceptions in Information Technology Project Teams

    Science.gov (United States)

    Fune, Roy P.

    2013-01-01

    The purpose of this study was to uncover Information Technology (IT) Project Managers' and IT Professionals' perceptions of effective leadership styles as they apply to project success. There have been prior studies dealing with the differences in perceptions between IT Functional Manager's leadership self-perception versus staff perceptions of…

  13. The Cultural Challenges of Managing Global Project Teams: A Study of Brazilian Multinationals

    Directory of Open Access Journals (Sweden)

    Ivete Rodrigues

    2013-04-01

    Full Text Available The internationalization of Brazilian companies brings a new reality: the need for implementation of global projects that bring, in turn, the challenge of managing multicultural teams. Since this is a recent phenomenon with little theoretical development, this study sought to understand the relationships between cultural characteristics and management teams of global projects in Brazilian multinationals. To carry this discussion forward, we studied six cases of Brazilian multinational companies, with the aim of deepening the understanding of the management of global teams, involving the planning, deployment, development and management of human resources. Among the projects studied, it was found that there is very little concern with the specific issue of multiculturalism and little inter-cultural incentive to the development of team members, which ends up hindering the construction of a global mindset, important for the Brazilian multinational companies to perform successfully abroad. Faced with this situation, each of the managerial processes mentioned were presented with a number of actions to be undertaken by the project manager in three different dimensions: the project itself, the organization and the global environment. The work contributes, thus, to enable Brazilian multinational companies to manage their global teams in order to maximize the advantages of global teams, such as increased creativity and innovative capacity, but avoid the problems that multiculturalism can bring, ranging from conflicts between people to project failure.

  14. Results Without Authority Controlling a Project When the Team Doesn't Report to You

    CERN Document Server

    KENDRICK, Tom

    2012-01-01

    It's tricky enough to spearhead a big project when you're the boss. But when you're the leader of a team of people who don't report to you, the obstacles are even greater. Results Without Authority is the definitive book for project managers looking to establish credibility and control. A groundbreaker in the field, it supplies a start-to-finish system for getting successful project results from cross-functional, outsourced, and other types of teams. The completely updated second edition includes new information on: * Agile methods and evolving project management tools * Strategies for working

  15. Primary teachers conducting inquiry projects : effects on attitudes towards teaching science and conducting inquiry

    NARCIS (Netherlands)

    van Aalderen-Smeets, Sandra; Walma van der Molen, Julie Henriëtte; van Hest, Erna G.W.C.M.; Poortman, Cindy Louise

    2017-01-01

    This study used an experimental, pretest-posttest control group design to investigate whether participation in a large-scale inquiry project would improve primary teachers’ attitudes towards teaching science and towards conducting inquiry. The inquiry project positively affected several elements of

  16. Primary Teachers Conducting Inquiry Projects: Effects on Attitudes towards Teaching Science and Conducting Inquiry

    Science.gov (United States)

    van Aalderen-Smeets, Sandra I.; Walma van der Molen, Juliette H.; van Hest, Erna G. W. C. M.; Poortman, Cindy

    2017-01-01

    This study used an experimental, pretest-posttest control group design to investigate whether participation in a large-scale inquiry project would improve primary teachers' attitudes towards teaching science and towards conducting inquiry. The inquiry project positively affected several elements of teachers' attitudes. Teachers felt less anxious…

  17. ELECTRICAL SAFETY IMPROVEMENT PROJECT A COMPLEX WIDE TEAMING INITIATIVE

    Energy Technology Data Exchange (ETDEWEB)

    GRAY BJ

    2007-11-26

    This paper describes the results of a year-long project, sponsored by the Energy Facility Contractors Group (EFCOG) and designed to improve overall electrical safety performance throughout Department of Energy (DOE)-owned sites and laboratories. As evidenced by focused metrics, the Project was successful primarily due to the joint commitment of contractor and DOE electrical safety experts, as well as significant support from DOE and contractor senior management. The effort was managed by an assigned project manager, using classical project-management principles that included execution of key deliverables and regular status reports to the Project sponsor. At the conclusion of the Project, the DOE not only realized measurable improvement in the safety of their workers, but also had access to valuable resources that will enable them to do the following: evaluate and improve electrical safety programs; analyze and trend electrical safety events; increase electrical safety awareness for both electrical and non-electrical workers; and participate in ongoing processes dedicated to continued improvement.

  18. A team leadership approach to managing the transition from construction to operations for an environmental project

    International Nuclear Information System (INIS)

    Kelly, J.W.

    1994-06-01

    This presentation describes a team approach, at the totalproject level that focused team members with common objectives, for the transition to start-up and operation of the project. The Integrated Management Team (IMT) approach has been successful for this US Department of Energy (DOE) environmental restoration project at the Hanford Site in Richland, Washington. The $53.8-million project will collect, treat, and dispose of low-level mixed waste water discharges from the Hanford Site. Construction is scheduled for completion in September 1994 and facility start-up in June 1995. The project challenge is for leadership that is committed to the transition from construction to operation of the environmental restoration project

  19. Quality Interaction Between Mission Assurance and Project Team Members

    Science.gov (United States)

    Kwong-Fu, Helenann H.; Wilson, Robert K.

    2006-01-01

    Mission Assurance independent assessments started during the development cycle and continued through post launch operations. In operations, Health and Safety of the Observatory is of utmost importance. Therefore, Mission Assurance must ensure requirements compliance and focus on process improvements required across the operational systems including new/modified products, tools, and procedures. The deployment of the interactive model involves three objectives: Team member Interaction, Good Root Cause Analysis Practices, and Risk Assessment to avoid reoccurrences. In applying this model, we use a metric based measurement process and was found to have the most significant effect, which points to the importance of focuses on a combination of root cause analysis and risk approaches allowing the engineers the ability to prioritize and quantify their corrective actions based on a well-defined set of root cause definitions (i.e. closure criteria for problem reports), success criteria and risk rating definitions.

  20. Updates from the AmeriFlux Management Project Tech Team

    Science.gov (United States)

    Biraud, S.; Chan, S.; Dengel, S.; Polonik, P.; Hanson, C. V.; Billesbach, D. P.; Torn, M. S.

    2017-12-01

    The goal of AmeriFlux is to develop a network of long-term flux sites for quantifying and understanding the role of the terrestrial biosphere in global climate and environmental change. The AmeriFlux Management Program (AMP) Tech Team at LBNL strengthens the AmeriFlux Network by (1) standardizing operational practices, (2) developing calibration and maintenance routines, and (3) setting clear data quality goals. In this poster we will present results and recent progress in three areas: IRGA intercomparison experiment in cooperation with UC Davis, and main manufacturers of sensors used in the AmeriFlux network (LI-COR, Picarro, and Campbell Scientific). Gill sonic anemometers characterization in collaboration with John Frank and Bill Massman (US Forest Service) following the discovery of a significant firmware problem in commonly used Gill Sonic anemometer, Unmanned aerial systems (UAS), and sensors systematically used at AmeriFlux sites to improve site characterization.

  1. Team-Teaching a Digital Senior Capstone Project in CTE

    Science.gov (United States)

    Ryan, Melanie D.; Tews, Nichole M.; Washer, Barton A.

    2012-01-01

    Secondary career and technical education (CTE) students are faced with the unique challenge of learning not only specific content-related knowledge and skills, but also postsecondary preparation, 21st century technology, employability and self-marketing skills. At Cass Career Center in Harrisonville, Missouri, a senior capstone project was…

  2. Can I Trust You? Profile Elements that Inform First Impressions of Trustworthiness in Virtual Project Teams

    NARCIS (Netherlands)

    Rusman, Ellen; Van Bruggen, Jan; Sloep, Peter; Valcke, Martin; Koper, Rob

    2010-01-01

    Rusman, E., Van Bruggen, J., Sloep, P. B., Valcke, M., & Koper, R. (2012). Can I Trust You? Profile Elements that Inform First Impressions of Trustworthiness in Virtual Project Teams. International Journal of Information Technology Project Management (IJITPM), 3(1), 15-35.

  3. Project work on wellbeing in multidisciplinary student teams : A triple testimonial on eps at artesis

    NARCIS (Netherlands)

    Rohaert, S.; Baelus, C.; Lacko, D.

    2012-01-01

    The European Project Semester (EPS) programme offers an educational framework to support students to practice problem-and project-based cross-disciplinary product innovation and research, in small multidisciplinary and international teams. To explore the potential and the restrictions of this

  4. Virtual Teaming and Collaboration Technology: A Study of Influences on Virtual Project Outcomes

    Science.gov (United States)

    Broils, Gary C.

    2014-01-01

    The purpose of this quantitative correlational study was to explore the relationships between the independent variables, contextual factors for virtual teams and collaboration technology, and the dependent variable, virtual project outcomes. The problem leading to the need for the study is a lower success rate for virtual projects compared to…

  5. The programme benefits of improving project team communication through a contact centre

    Directory of Open Access Journals (Sweden)

    Bond-Barnard, T. J.

    2013-08-01

    Full Text Available A South African national programme to repair government infrastructure uses a contact centre (or call centre to facilitate and manage communication. An important question is: How does the contact centre benefit the programme and its projects? This study discusses the findings of a survey that quantified the benefits of the programme when the communication between team members in the programme was improved by using a contact centre. The results show that, by using a contact centre to improve the communication between project team members, their perception of communication effectiveness, quality of project deliverables, service delivery, and customer satisfaction of the programme dramatically increases.

  6. Project-focused activity and knowledge tracker: a unified data analysis, collaboration, and workflow tool for medicinal chemistry project teams.

    Science.gov (United States)

    Brodney, Marian D; Brosius, Arthur D; Gregory, Tracy; Heck, Steven D; Klug-McLeod, Jacquelyn L; Poss, Christopher S

    2009-12-01

    Advances in the field of drug discovery have brought an explosion in the quantity of data available to medicinal chemists and other project team members. New strategies and systems are needed to help these scientists to efficiently gather, organize, analyze, annotate, and share data about potential new drug molecules of interest to their project teams. Herein we describe a suite of integrated services and end-user applications that facilitate these activities throughout the medicinal chemistry design cycle. The Automated Data Presentation (ADP) and Virtual Compound Profiler (VCP) processes automate the gathering, organization, and storage of real and virtual molecules, respectively, and associated data. The Project-Focused Activity and Knowledge Tracker (PFAKT) provides a unified data analysis and collaboration environment, enhancing decision-making, improving team communication, and increasing efficiency.

  7. The Competence for Project Team Members in the Conditions of Remote Working

    Directory of Open Access Journals (Sweden)

    Zdonek Iwona

    2017-02-01

    Full Text Available The article presents results of the qualitative research on competence of project team members in the conditions of remote working. These competences were considered in relation to different roles, which the members of such a team accept. The reference point to studied roles was the concept of Hansen and Allen authorships, and with regard to competence, the author's synthesis of deliberations above their models described in the literature.

  8. Crew Resource Management (CRM) video storytelling project: a team-based learning activity

    OpenAIRE

    Ma, Maggie Jiao; Denando, John

    2011-01-01

    This Crew Resource Management (CRM) video storytelling project asks students to work in a team (4-5 people per team) to create (write and produce) a video story. The story should demonstrate lacking and ill practices of CRM knowledge and skills, or positive skills used to create a successful scenario in aviation (e. g. , flight training, commercial aviation, airport management). The activity is composed of two parts: (1) creating a video story of CRM in aviation, and (2) delivering a group pr...

  9. Exploring the dynamics of formal and informal networks in complex multi-team development projects

    DEFF Research Database (Denmark)

    Kratzer, J.; Gemuenden, H. G.; Lettl, Christopher

    2007-01-01

    The increasing number of complex multi-team projects and the scarcity of knowledge about how to run them successfully, create a need for systematic empirical studies. We attempt to lessen this empirical gap by examining the overlap and structure of formally ascribed design interfaces and informal...... communication networks between participating teams in two complex multi-team projects in the space industry. We study the two projects longitudinally throughout the design and integration phases of product development. There are three major findings. First, formally ascribed design interfaces and informal...... communication networks overlap only marginally. Second, the structure of informal communication remains largely stable in the transition from the design to the integration phase. The third and most intriguing finding is that the weak overlap between formally ascribed design interfaces and the informal...

  10. Cooperative Learning through Team-Based Projects in the Biotechnology Industry.

    Science.gov (United States)

    Luginbuhl, Sarah C; Hamilton, Paul T

    2013-01-01

    We have developed a cooperative-learning, case studies project model that has teams of students working with biotechnology professionals on company-specific problems. These semester-long, team-based projects can be used effectively to provide students with valuable skills in an industry environment and experience addressing real issues faced by biotechnology companies. Using peer-evaluations, we have seen improvement in students' professional skills such as time-management, quality of work, and level of contribution over multiple semesters. This model of team-based, industry-sponsored projects could be implemented in other college and university courses/programs to promote professional skills and expose students to an industry setting.

  11. SWAT (Student Weekend Arborist Team): A Model for Land Grant Institutions and Cooperative Extension Systems to Conduct Street Tree Inventories

    Science.gov (United States)

    Cowett, F.D.; Bassuk, N.L.

    2012-01-01

    SWAT (Student Weekend Arborist Team) is a program affiliated with Cornell University and Extension founded to conduct street tree inventories in New York State communities with 10,000 residents or fewer, a group of communities underserved in community forestry planning. Between 2002 and 2010, SWAT conducted 40 inventories, and data from these…

  12. Code of Conduct for wind-power projects - Feasibility study

    International Nuclear Information System (INIS)

    Strub, P.; Ziegler, Ch.

    2009-02-01

    This final report deals with the results of a feasibility study concerning the development of a Code of Conduct for wind-power projects. The aim is to strengthen the acceptance of wind-power by the general public. The necessity of new, voluntary market instruments is discussed. The urgency of development in this area is quoted as being high, and the authors consider the feasibility of the definition of a code of conduct as being proven. The code of conduct can, according to the authors, be of use at various levels but primarily in project development. Further free-enterprise instruments are also suggested that should help support socially compatible and successful market development. It is noted that the predominant portion of those questioned are prepared to co-operate in further work on the subject

  13. Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects

    Energy Technology Data Exchange (ETDEWEB)

    Sanders, Mark D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mathew, Paul [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-05-01

    This guide presents a process for three key activities for the building owner in preparing to retrofit existing commercial buildings: selecting project teams, benchmarking the existing building, and financing the retrofit work. Although there are other essential steps in the retrofit process, the three activities presented in this guide are the critical elements where the building owner has the greatest influence on the outcome of the project.

  14. One more thing: Faculty response to increased emphasis on project teams in undergraduate engineering education

    Science.gov (United States)

    Hunter, Jane

    Tenured and tenure-track faculty members at institutions of higher education, especially those at Research I institutions, are being asked to do more than ever before. With rapidly changing technology, significant decreases in public funding, the shift toward privately funded research, and the ever increasing expectations of students for an education that adequately prepares them for professional careers, engineering faculty are particularly challenged by the escalating demands on their time. In 1996, the primary accreditation organization for engineering programs (ABET) adopted new criteria that required, among other things, engineering programs to teach students to function on multidisciplinary teams and to communicate effectively. In response, most engineering programs utilize project teams as a strategy for teaching these skills. The purpose of this qualitative study of tenured and tenure track engineering faculty at a Research I institution in the southwestern United States was to explore the variety of ways in which the engineering faculty responded to the demands placed upon them as a result of the increased emphasis on project teams in undergraduate engineering education. Social role theory and organizational climate theory guided the study. Some faculty viewed project teams as an opportunity for students to learn important professional skills and to benefit from collaborative learning but many questioned the importance and feasibility of teaching teamwork skills and had concerns about taking time away from other essential fundamental material such as mathematics, basic sciences and engineering sciences. Although the administration of the College of Engineering articulated strong support for the use of project teams in undergraduate education, the prevailing climate did little to promote significant efforts related to effective utilization of project teams. Too often, faculty were unwilling to commit sufficient time or effort to make project teamwork a

  15. Structural equation modeling analysis of factors influencing architects' trust in project design teams

    Institute of Scientific and Technical Information of China (English)

    DING Zhi-kun; NG Fung-fai; WANG Jia-yuan

    2009-01-01

    This paper describes a structural equation modeling (SEM) analysis of factors influencing architects' trust in project design teams. We undertook a survey of architects, during which we distributed 193 questionnaires in 29 A-level architectural We used Amos 6.0 for SEM to identify significant personal construct based factors affecting interpersonal trust. The results show that only social interaction between architects significantly affects their interpersonal trust. The explained variance of trust is not very high in the model. Therefore, future research should add more factors into the current model. The practical implication is that team managers should promote the social interactions between team members such that the interpersonal trust level between team members can be improved.

  16. Formation of the Project Team on Introduction of Financial Controlling into Banking Activity

    Directory of Open Access Journals (Sweden)

    Chmutova Iryna M.

    2014-01-01

    Full Text Available The article identifies order and content of stages of formation of the project team of introduction of financial controlling into banking activity. It offers a procedure of identification of the qualitative team composition, which envisages selection of candidates with the use of rules of fuzzy logical conclusion for assessing three groups of competences: personal (initiative, communication ability, creative ability, purposefulness and responsibility; common managerial (ability to work in a team, ability to manage conflicts, ability to manage, strategic thinking ability, ability to plan team work and distribute rights and obligations and co-ordinate work; special managerial (ability to justify and make decisions under conditions of uncertainty and dynamism, analytical abilities, ability to master new directions and methods of work and use them, skills and ability to form justified recommendations, special knowledge – theoretical grounds and recommendations of modern science with respect to introduction of controlling.

  17. Geomechanical/Geochemical Modeling Studies Conducted within the International DECOVALEX Project

    International Nuclear Information System (INIS)

    Birkholzer, J.T.; Rutqvist, J.; Sonnenthal, E.L.; Barr, D.; Chijimatsu, M.; Kolditz, O.; Liu, Q.; Oda, Y.; Wang, W.; Xie, M.; Zhang, C.

    2005-01-01

    The DECOVALEX project is an international cooperative project initiated by SKI, the Swedish Nuclear Power Inspectorate, with participation of about 10 international organizations. The general goal of this project is to encourage multidisciplinary interactive and cooperative research on modeling coupled thermo-hydro-mechanical-chemical (THMC) processes in geologic formations in support of the performance assessment for underground storage of radioactive waste. One of the research tasks, initiated in 2004 by the U.S. Department of Energy (DOE), addresses the long-term impact of geomechanical and geochemical processes on the flow conditions near waste emplacement tunnels. Within this task, four international research teams conduct predictive analysis of the coupled processes in two generic repositories, using multiple approaches and different computer codes. Below, we give an overview of the research task and report its current status

  18. Geomechanical/Geochemical Modeling Studies Conducted Within the International DECOVALEX Project

    International Nuclear Information System (INIS)

    J.T. Birkholzer; J. Rutqvist; E.L. Sonnenthal; D. Barr; M.Chijimatsu; O. Kolditz; Q. Liu; Y. Oda; W. Wang; M. Xie; C. Zhang

    2006-01-01

    The DECOVALEX project is an international cooperative project initiated by SKI, the Swedish Nuclear Power Inspectorate, with participation of about 10 international organizations. The general goal of this project is to encourage multidisciplinary interactive and cooperative research on modeling coupled thermo-hydro-mechanical-chemical (THMC) processes in geologic formations in support of the performance assessment for underground storage of radioactive waste. One of the research tasks, initiated in 2004 by the U.S. Department of Energy (DOE), addresses the long-term impact of geomechanical and geochemical processes on the flow conditions near waste emplacement tunnels. Within this task, four international research teams conduct predictive analysis of the coupled processes in two generic repositories, using multiple approaches and different computer codes. Below, we give an overview of the research task and report its current status

  19. Transformational leadership and project success : The mediating role of team-building

    NARCIS (Netherlands)

    Aga, Deribe Assefa; Noorderhaven, Niels; Vallejo, Bertha

    2016-01-01

    Although the effect of transformational leadership on project success is empirically supported, less is known about the mechanisms that explain this effect. To address this issue, we propose the mediating role of team-building as a possible explanation of the relationship between transformational

  20. Learning to Argue with Intermediate Macro Theory: A Semester-Long Team Writing Project

    Science.gov (United States)

    Strasser, Georg; Wolfe, Marketa Halova

    2014-01-01

    The authors describe their experience with integrating a semester-long economic analysis project into an intermediate macroeconomic theory course. Students work in teams of "economic advisors" to write a series of nested reports that analyze the current state of the economy, and propose and evaluate policies for a decision-maker. The…

  1. Capstone Interdisciplinary Team Project: A Requirement for the MS in Sustainability Degree

    Science.gov (United States)

    Jiji, Latif M.; Schonfeld, Irvin Sam; Smith, George A.

    2015-01-01

    Purpose: This paper aims to describe experience gained with a required six-credit year-long course, the Capstone Interdisciplinary Team Project, a key component of the Master of Science (MS) in Sustainability degree at the City College of New York. A common feature of sustainability problems is their interdisciplinary nature. Solutions to…

  2. Project T.E.A.M. (Technical Education Advancement Modules). Introduction to Statistical Process Control.

    Science.gov (United States)

    Billings, Paul H.

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 6-hour introductory module on statistical process control (SPC), designed to develop competencies in the following skill areas: (1) identification of the three classes of SPC use; (2) understanding a process and how it works; (3)…

  3. Project T.E.A.M. (Technical Education Advancement Modules). Advanced Statistical Process Control.

    Science.gov (United States)

    Dunlap, Dale

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 20-hour advanced statistical process control (SPC) and quality improvement course designed to develop the following competencies: (1) understanding quality systems; (2) knowing the process; (3) solving quality problems; and (4)…

  4. Student Team Projects in Information Systems Development: Measuring Collective Creative Efficacy

    Science.gov (United States)

    Cheng, Hsiu-Hua; Yang, Heng-Li

    2011-01-01

    For information systems development project student teams, learning how to improve software development processes is an important training. Software process improvement is an outcome of a number of creative behaviours. Social cognitive theory states that the efficacy of judgment influences behaviours. This study explores the impact of three types…

  5. Using Agile Project Management to Enhance the Performance of Instructional Design Teams

    Science.gov (United States)

    Sweeney, David S.; Cifuentes, Lauren

    2010-01-01

    Instructional design models describe in detail methodologies for designing effective instruction. Several widely adopted models include suggestions for managing instructional design projects. However, these suggestions focus on how to manage the instructional design steps rather than the instructional design and development team process. The…

  6. Project team formation support for self-directed learners in social learning networks

    NARCIS (Netherlands)

    Spoelstra, Howard; Van Rosmalen, Peter; Sloep, Peter

    2012-01-01

    Spoelstra, H., Van Rosmalen, P., & Sloep, P. B. (2012). Project team formation support for self-directed learners in social learning networks. In P. Kommers, P. Isaias, & N. Bessis (Eds.), Proceedings of the IADIS International Conference on Web Based Communities and Social Media (ICWBC & SM 2012)

  7. The link class project : Collaborative virtual teams between Peru and The Netherlands

    NARCIS (Netherlands)

    Olivos Rossini, L.M.; Rincon, Sandra; Rutkowski, Anne-Francoise

    2015-01-01

    The Link Class Project presented in this article provides an example of established collaborative group activities to negotiate and build a report together in virtual teams composed of students at Universidad ESAN, Lima (Peru) and Tilburg University, Tilburg (Netherlands). It further analyzes the

  8. One step ahead of technology Cern and HP - an ideal team project

    CERN Multimedia

    Garvey, Kelsey

    2009-01-01

    "In 2004, the It team at Cern recognized the comprehensiveness and future of the LHC Computing Grid Project and realized that the IT infrastructures were not sufficient enough to manage the data. Cern therefore partnered with HP ProCurve the following year to minimize the day-to-day workload and improve infrastructure for data output" (1 page)

  9. Total Quality Management: Analysis, Evaluation and Implementation Within ACRV Project Teams

    Science.gov (United States)

    Raiman, Laura B.

    1991-01-01

    Total quality management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The Assured Crew Return Vehicle (ACRV) Project Office was identified as an excellent project in which to demonstrate the applications and benefits of TQM processes. As the ACRV Program moves through its various stages of development, it is vital that effectiveness and efficiency be maintained in order to provide the Space Station Freedom (SSF) crew an affordable, on-time assured return to Earth. A critical factor for the success of the ACRV is attaining the maximum benefit from the resources applied to the program. Through a series of four tutorials on various quality improvement techniques, and numerous one-on-one sessions during the SSF's 10-week term in the project office, results were obtained which are aiding the ACRV Office in implementing a disciplined, ongoing process for generating fundamental decisions and actions that shape and guide the organization. Significant advances were made in improving the processes for two particular groups - the correspondence distribution team and the WATER Test team. Numerous people from across JSC were a part of the various team activities including engineering, man systems, and safety. The work also included significant interaction with the support contractor to the ACRV Project. The results of the improvement activities can be used as models for other organizations desiring to operate under a system of continuous improvement. In particular, they have advanced the ACRV Project Teams further down the path of continuous improvement, in support of a working philosophy of TQM.

  10. Regional absolute conductivity reconstruction using projected current density in MREIT

    International Nuclear Information System (INIS)

    Sajib, Saurav Z K; Kim, Hyung Joong; Woo, Eung Je; Kwon, Oh In

    2012-01-01

    Magnetic resonance electrical impedance tomography (MREIT) is a non-invasive technique for imaging the internal conductivity distribution in tissue within an MRI scanner, utilizing the magnetic flux density, which is introduced when a current is injected into the tissue from external electrodes. This magnetic flux alters the MRI signal, so that appropriate reconstruction can provide a map of the additional z-component of the magnetic field (B z ) as well as the internal current density distribution that created it. To extract the internal electrical properties of the subject, including the conductivity and/or the current density distribution, MREIT techniques use the relationship between the external injection current and the z-component of the magnetic flux density B = (B x , B y , B z ). The tissue studied typically contains defective regions, regions with a low MRI signal and/or low MRI signal-to-noise-ratio, due to the low density of nuclear magnetic resonance spins, short T 2 or T* 2 relaxation times, as well as regions with very low electrical conductivity, through which very little current traverses. These defective regions provide noisy B z data, which can severely degrade the overall reconstructed conductivity distribution. Injecting two independent currents through surface electrodes, this paper proposes a new direct method to reconstruct a regional absolute isotropic conductivity distribution in a region of interest (ROI) while avoiding the defective regions. First, the proposed method reconstructs the contrast of conductivity using the transversal J-substitution algorithm, which blocks the propagation of severe accumulated noise from the defective region to the ROI. Second, the proposed method reconstructs the regional projected current density using the relationships between the internal current density, which stems from a current injection on the surface, and the measured B z data. Combining the contrast conductivity distribution in the entire imaging

  11. SemanticOrganizer: A Customizable Semantic Repository for Distributed NASA Project Teams

    Science.gov (United States)

    Keller, Richard M.; Berrios, Daniel C.; Carvalho, Robert E.; Hall, David R.; Rich, Stephen J.; Sturken, Ian B.; Swanson, Keith J.; Wolfe, Shawn R.

    2004-01-01

    SemanticOrganizer is a collaborative knowledge management system designed to support distributed NASA projects, including diverse teams of scientists, engineers, and accident investigators. The system provides a customizable, semantically structured information repository that stores work products relevant to multiple projects of differing types. SemanticOrganizer is one of the earliest and largest semantic web applications deployed at NASA to date, and has been used in diverse contexts ranging from the investigation of Space Shuttle Columbia's accident to the search for life on other planets. Although the underlying repository employs a single unified ontology, access control and ontology customization mechanisms make the repository contents appear different for each project team. This paper describes SemanticOrganizer, its customization facilities, and a sampling of its applications. The paper also summarizes some key lessons learned from building and fielding a successful semantic web application across a wide-ranging set of domains with diverse users.

  12. The international INTRAVAL project. Summary and conclusions by the TVO/VTT Team

    International Nuclear Information System (INIS)

    Hautojaervi, A.

    1994-12-01

    Teollisuuden Voima Oy (TVO) participated the international cooperation project INTRAVAL and VTT Energy acted as a project team. The Finnish participation focused on flow and transport in crystalline fractured rock and six test cases out of thirteen were tackled. The experimental results were evaluated mainly by means of analytical transport models. The report presents a short review of the experience obtained in the course of the project. It concentrates on the issues revealed in the discussions and analyses of the six test cases in which the TVO/VTT team actively participated but some of the conclusions are even more general in nature. Some suggestions are made for future experimental and theoretical work in the field of geosphere. (15 refs., 2 tabs.)

  13. Supply chain partnership in construction a field study on project team level factors

    NARCIS (Netherlands)

    Koolwijk, J.S.J.; Van Oel, C.J.; Wamelink, J.W.F.

    2015-01-01

    People and their relationship are at the heart of supply chain partnerships, however there is a lack of qualitative studies focusing on how integrated relationships may be developed. Therefore, the purpose of this study was to conduct field research to deepen our understanding of team level

  14. Balancing creativity and time efficiency in multi-team R&D projects: The alignment of formal and informal networks

    DEFF Research Database (Denmark)

    Kratzer, Jan; Gemuenden, Hans Georg; Lettl, Christopher

    2008-01-01

    and their effect on the challenge to balance project creativity and time efficiency. In order to analyse this issue data in two multi-team R&D projects in space industry are collected. There are two intriguing findings that are partly contradicting the state-of-the art knowledge. First, formally ascribed design...... with the team's creativity, whereas it negatively impacts the team's time efficiency....

  15. Crew Resource Management (CRM video storytelling project: a team-based learning activity

    Directory of Open Access Journals (Sweden)

    Ma, Maggie Jiao

    2011-01-01

    Full Text Available This Crew Resource Management (CRM video storytelling project asks students to work in a team (4-5 people per team to create (write and produce a video story. The story should demonstrate lacking and ill practices of CRM knowledge and skills, or positive skills used to create a successful scenario in aviation (e. g. , flight training, commercial aviation, airport management. The activity is composed of two parts: (1 creating a video story of CRM in aviation, and (2 delivering a group presentation. Each tem creates a 5-8 minute long video clip of its story. The story must be originally created by the team to educate pilot and/or aviation management students on good practices of CRM in aviation. Accidents and incidents can be used as a reference to inspire ideas. However, this project is not to re-create any previous CRM accidents/incidents. The video story needs to be self-contained and address two or more aspects of CRM specified in the Federal Aviation Administration’s Advisory Circular 120-51. The presentation must include the use of PowerPoint or similar software and additional multimedia visual aids. The presentation itself will last no more than 17 minutes in length; including the actual video story (each group has additional 3 minutes to set up prior to the presentation. During the presentation following the video each team will discuss the CRM problems (or invite audience to identify CRM problems and explain what CRM practices were performed, and should have been performed. This presentation also should describe how each team worked together in order to complete this project (i. e. , good and bad CRM practiced

  16. CORR Guidelines. Preparing and Conducting Review Missions of Construction Project Readiness for Nuclear Power Plants

    International Nuclear Information System (INIS)

    2013-01-01

    The construction readiness review (CORR) mission for nuclear power plant projects has been established with the aim of conducting peer reviews of construction projects related to nuclear power plants. Such a mission provides a detailed assessment of readiness for construction, construction progress, readiness for turnover, as well as recommendations for improvement. Organizations in Member States, such as nuclear utilities, owners, regulators and technical support organizations, can benefit from such reviews. A team of international experts with complementing specialities will conduct the CORR mission. The review is based on appropriate IAEA publications, such as IAEA Safety Standards Series Guides and IAEA Nuclear Energy Series publications, as well as on internationally recognized project and construction management guides. Mission findings are summarized in a mission report, which includes a list of recommendations, suggestions and identified good practices. The review is not intended to be a regulatory inspection or an audit against international codes and standards. Rather, it is a peer review aimed at improving implementation processes and procedures through an exchange of technical experiences and practices at the working level. The mission is applicable at any stage of a nuclear power plant construction project, although two specific phases are targeted: (1) start of construction mission (Phase 1 mission) and (2) an in-progress mission (Phase 2 mission). Missions are initiated when official requests are submitted by Member States through the appropriate IAEA channels

  17. Using MBTI for the Success Assessment of Engineering Teams in Project-Based Learning

    Science.gov (United States)

    Rodríguez Montequín, V.; Mesa Fernández, J. M.; Balsera, J. Villanueva; García Nieto, A.

    2013-01-01

    Project-Based Learning (PBL) is a teaching and learning methodology that emphasizes student centered instruction by assigning projects. The students have to conduct significant projects and cope with realistic working conditions and scenarios. PBL is generally done by groups of students working together towards a common goal. Several factors play…

  18. Team collaborative innovation management based on primary pipes automatic welding project

    International Nuclear Information System (INIS)

    Li Jing; Wang Dong; Zhang Ke

    2012-01-01

    The welding quality of primary pipe directly affects the safe operation of nuclear power plants. Primary pipe automatic welding, first of its kind in China, is a complex systematic project involving many facets, such as design, manufacturing, material, and on-site construction. A R and D team was formed by China Guangdong Nuclear Power Engineering Co., Ltd. (CNPEC) together with other domestic nuclear power design institutes, and manufacturing and construction enterprises. According to the characteristics of nuclear power plant construction, and adopting team collaborative innovation management mode, through project co-ordination, resources allocation and building production, education and research collaborative innovation platform, CNPEC successfully developed the primary pipe automatic welding technique which has been widely applied to the construction of nuclear power plant, creating considerable economic benefits. (authors)

  19. The Link Class Project: Collaborative virtual teams between Peru and The Netherlands

    OpenAIRE

    Mariella Olivos Rossini; Sandra Rincón; Anne-Francoise Rutkowski

    2015-01-01

    The Link Class Project presented in this article provides an example of established collaborative group activities to negotiate and build a report together in virtual teams composed of students at Universidad ESAN, Lima (Peru) and Tilburg University, Tilburg (Netherlands). It further analyzes the effects of a campus based internationalization strategy supported by the use of technology. Based on previous experiences with virtual classrooms, the authors adhere to the ancient Chinese philosophe...

  20. Designing and Developing an Effective Safety Program for a Student Project Team

    Directory of Open Access Journals (Sweden)

    John Catton

    2018-05-01

    Full Text Available In the workplace, safety must be the first priority of all employers and employees alike. In order to maintain the safety and well-being of their employees, employers must demonstrate due diligence and provide the appropriate safety training to familiarize employees with the hazards within the workplace. Although, a student “project team” is not a business, the work done by students for their respective teams is synonymous with the work done in a place of business and thus requires that similar safety precautions and training be administered to students by their team leads and faculty advisors. They take on the role of supervisors within the team dynamic. Student teams often utilize the guidelines and policies that their universities or colleges have developed in order to build a set of standard operating procedures and safety training modules. These guidelines aid in providing a base for training for the team, however, they are no substitute for training specific to the safety risks associated with the work the team is doing. In order to comply with these requirements, a full analysis of the workplace is required to be completed. A variety of safety analysis techniques need to be applied to define the hazards within the workplace and institute appropriate measures to mitigate them. In this work, a process is developed for establishing a safety training program for a student project team, utilizing systems safety management techniques and the aspect of gamification to produce incentives for students to continue developing their skills. Although, systems safety management is typically applied to the design of active safety components or systems, the techniques for identifying and mitigating hazards can be applied in the same fashion to the workplace. They allow one to analyze their workplace and determine the hazards their employees might encounter, assign appropriate hazard ratings and segregate each respective hazard by their risks. In so

  1. Complex approach in telecommunication engineering education: develop engineering skills by a team project

    Directory of Open Access Journals (Sweden)

    Scripcariu Luminița

    2017-01-01

    Full Text Available This paper provides an overview of the educational process of telecommunication engineering students by presenting the preparation of a team project focused on information security. Our educational approach combines basic knowledge such as mathematics with specialized engineering notions and various skills. The project theme is to design, implement and test an encryption algorithm. Students are provided with online courses, specific software programs and Internet access. They have to choose an encryption algorithm, to study its details and to write the script of the encryption algorithm in MATLAB program. The algorithm is implemented in C/C++ programming language and tested. Finally, a concurrent team tries to break the algorithm by finding the decryption key. It is an interactive approach which combines various education methods including gaming concepts. The covered topics provide students professional outcomes such as knowledge and use of specific mathematical tools and software environments (C/C ++ programming languages, MATLAB, abilities to design, develop, implement and test software algorithms. The project also provides transversal outcomes such as ability to team work, skills of computer use and information technology and capability to take responsibilities. Creativity is also encouraged by extending the algorithm to other encryption key lengths than the usual ones.

  2. A Path to Successful Energy Retrofits: Early Collaboration through Integrated Project Delivery Teams

    Energy Technology Data Exchange (ETDEWEB)

    Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-10-01

    This document guides you through a process for the early design phases of retrofit projects to help you mitigate frustrations commonly experienced by building owners and designers. It outlines the value of forming an integrated project delivery team and developing a communication and information-sharing infrastructure that fosters collaboration. This guide does not present a complete process for designing an energy retrofit for a building. Instead, it focuses on the early design phase tasks related to developing and selecting energy efficiency measures (EEMs) that benefit from collaboration, and highlights the resulting advantages.

  3. Improving patient care through student leadership in team quality improvement projects.

    Science.gov (United States)

    Tschannen, Dana; Aebersold, Michelle; Kocan, Mary Jo; Lundy, Francene; Potempa, Kathleen

    2015-01-01

    In partnership with a major medical center, senior-level nursing students completed a root cause analysis and implementation plan to address a unit-specific quality issue. To evaluate the project, unit leaders were asked their perceptions of the value of the projects and impact on patient care, as well as to provide exemplars depicting how the student root cause analysis work resulted in improved patient outcome and/or unit processes. Liaisons noted benefits of having an RCA team, with positive impact on patient outcomes and care processes.

  4. The Virtual Design Team: Designing Project Organizations as Engineers Design Bridges

    Directory of Open Access Journals (Sweden)

    Raymond E. Levitt

    2012-08-01

    Full Text Available This paper reports on a 20-year program of research intended to advance the theory and practice of organization design for projects from its current status as an art practiced by a handful of consultants worldwide, based on their intuition and tacit knowledge, to: (1 an “organizational engineering” craft, practiced by a new generation of organizational designers; and (2 an attractive and complementary platform for new modes of “virtual synthetic organization theory research.” The paper begins with a real-life scenario that provided the motivation for developing the Virtual Design Team (VDT, an agent-based project organizational simulation tool to help managers design the work processes and organization of project teams engaged in large, semi-routine but complex and fast-paced projects. The paper sets out the underlying philosophy, representation, reasoning, and validation of VDT, and it concludes with suggestions for future research on computational modeling for organization design to extend the frontiers of organizational micro-contingency theory and expand the range of applicability and usefulness of design tools for project organizations and supply-chain networks based on this theory.

  5. A process model for design team communication within fast-track building projects using project websites

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Reymen, I.M.M.J.

    2008-01-01

    The factor time within building projects is on high pressure because of the increasing need for faster delivery of buildings. Within fast track, complex building projects the design process is an important key. Through case analyses offart-hack design processes it became obvious that process and

  6. Inequity-aversion and relative kindness intention jointly determine the expenditure of effort in project teams.

    Directory of Open Access Journals (Sweden)

    Jiaojie Han

    Full Text Available The literature on team cooperation has neglected the effects of relative kindness intention on cooperation, which we measure by comparing the kindness intentions of an agent to her group members to the kindness shown by other members to this same agent. We argue that the agent's emotional reaction to material payoff inequity is not constant, but rather affected by her relative kindness intention. Then, we apply the model to team projects with multiple partners and investigate how inequity-aversion and relative kindness intention jointly influence team cooperation. We first consider the case of homogeneous agents, where their marginal productivity levels and technical capacities are the same, and then consider the case of heterogeneous agents, where their marginal productivity levels and technical capacities are not the same. Our results show that inequity-aversion has no effect on effort expenditure in the former case, but does affect it in the latter case. The consideration of relative kindness intention may impact the agents' optimal cooperative effort expenditure when their technical capacities are different. In addition, it is beneficial for team cooperation, and might not only reduce the negative impact but also enhance the positive impact of inequity-aversion on the agents' effort expenditures.

  7. Learning Cell Biology as a Team: A Project-Based Approach to Upper-Division Cell Biology

    Science.gov (United States)

    Wright, Robin; Boggs, James

    2002-01-01

    To help students develop successful strategies for learning how to learn and communicate complex information in cell biology, we developed a quarter-long cell biology class based on team projects. Each team researches a particular human disease and presents information about the cellular structure or process affected by the disease, the cellular…

  8. Librarians as Part of Cross-Disciplinary, Multi-Institutional Team Projects: Experiences from the VIVO Collaboration

    Science.gov (United States)

    Garcia-Milian, Rolando; Norton, Hannah F.; Auten, Beth; Davis, Valrie I.; Holmes, Kristi L.; Johnson, Margeaux; Tennant, Michele R.

    2013-01-01

    Cross-disciplinary, team-based collaboration is essential for addressing today’s complex research questions, and librarians are increasingly entering into such collaborations. This study identifies skills needed as librarians integrate into cross-disciplinary teams, based on the experiences of librarians involved in the development and implementation of VIVO, a research discovery and collaboration platform. Participants discussed the challenges, skills gained, and lessons learned throughout the project. Their responses were analyzed in the light of the science of team science literature, and factors affecting collaboration on the VIVO team were identified. Skills in inclusive thinking, communication, perseverance, adaptability, and leadership were found to be essential. PMID:23833333

  9. Contribution of Full-Scope Simulator Development Project to the Dissemination of Nuclear Knowledge within New-Build–Project Teams

    International Nuclear Information System (INIS)

    Gain, P.

    2016-01-01

    Full text: In a context where few countries recently carried out nuclear new-build projects combined with very strong need for generation renewal, there exists a major stake for the training of the hundreds of engineers who are involved in the design and commissioning teams of this highly complex industrial facility. The Simulator project, which gives the first opportunity for integration and validation of the whole of the design data, to check their coherence, the good performance with the interface and conformity with the safety and performance requirements, allows a fast and effective competence rise of all the resources involved in its development. In addition, the phased availability of the whole of data generally results in having several phased versions of the simulator. Each can then be deployed in great number for training drills which also will contribute to share in optimal way knowledge on the reference plant design. This contexts of broader use of these training modules and use of simulation in support of the engineering activities lead to their use by many teams with varied profiles; and there too, the simulation technologies are of a remarkable effectiveness to share a common and stable knowledge management. (author

  10. Anisotropic conductivity imaging with MREIT using equipotential projection algorithm

    Energy Technology Data Exchange (ETDEWEB)

    Degirmenci, Evren [Department of Electrical and Electronics Engineering, Mersin University, Mersin (Turkey); Eyueboglu, B Murat [Department of Electrical and Electronics Engineering, Middle East Technical University, 06531, Ankara (Turkey)

    2007-12-21

    Magnetic resonance electrical impedance tomography (MREIT) combines magnetic flux or current density measurements obtained by magnetic resonance imaging (MRI) and surface potential measurements to reconstruct images of true conductivity with high spatial resolution. Most of the biological tissues have anisotropic conductivity; therefore, anisotropy should be taken into account in conductivity image reconstruction. Almost all of the MREIT reconstruction algorithms proposed to date assume isotropic conductivity distribution. In this study, a novel MREIT image reconstruction algorithm is proposed to image anisotropic conductivity. Relative anisotropic conductivity values are reconstructed iteratively, using only current density measurements without any potential measurement. In order to obtain true conductivity values, only either one potential or conductivity measurement is sufficient to determine a scaling factor. The proposed technique is evaluated on simulated data for isotropic and anisotropic conductivity distributions, with and without measurement noise. Simulation results show that the images of both anisotropic and isotropic conductivity distributions can be reconstructed successfully.

  11. Conducting Closed Habitation Experiments: Experience from the Lunar Mars Life Support Test Project

    Science.gov (United States)

    Barta, Daniel J.; Edeen, Marybeth A.; Henninger, Donald L.

    2006-01-01

    The Lunar-Mars Life Support Test Project (LMLSTP) was conducted from 1995 through 1997 at the National Aeronautics and Space Administration s (NASA) Johnson Space Center (JSC) to demonstrate increasingly longer duration operation of integrated, closed-loop life support systems that employed biological and physicochemical techniques for water recycling, waste processing, air revitalization, thermal control, and food production. An analog environment for long-duration human space travel, the conditions of isolation and confinement also enabled studies of human factors, medical sciences (both physiology and psychology) and crew training. Four tests were conducted, Phases I, II, IIa and III, with durations of 15, 30, 60 and 91 days, respectively. The first phase focused on biological air regeneration, using wheat to generate enough oxygen for one experimental subject. The systems demonstrated in the later phases were increasingly complex and interdependent, and provided life support for four crew members. The tests were conducted using two human-rated, atmospherically-closed test chambers, the Variable Pressure Growth Chamber (VPGC) and the Integrated Life Support Systems Test Facility (ILSSTF). Systems included test articles (the life support hardware under evaluation), human accommodations (living quarters, kitchen, exercise equipment, etc.) and facility systems (emergency matrix system, power, cooling, etc.). The test team was managed by a lead engineer and a test director, and included test article engineers responsible for specific systems, subsystems or test articles, test conductors, facility engineers, chamber operators and engineering technicians, medical and safety officers, and science experimenters. A crew selection committee, comprised of psychologists, engineers and managers involved in the test, evaluated male and female volunteers who applied to be test subjects. Selection was based on the skills mix anticipated for each particular test, and utilized

  12. CO-OP JIGSAW TEAM PROJECTS: A COOPERATIVE TEACHING METHOD TO IMPROVE STUDENTS‘ SPEAKING SKILL (An Experimental Study in a Senior High School

    Directory of Open Access Journals (Sweden)

    Diaz Innova Citra Arum

    2017-12-01

    Full Text Available An effective speaking activity involves active students to participate and create a life communication. The ideal condition of English speaking class involves the students‘ effectiveness in participating teaching and learning process. Nevertheless, some problems are emerged and one of them is that they often get nervous to speak in front of many people when they are asked to present their work to their friends. This paper reveals an experiment study in teaching speaking in a senior high school in Lamongan, East Java. It discusses about the effectiveness of cooperative teaching method known as coop jigsaw team projects in teaching speaking. All tenth grade students were used as the population and eighty students were taken as sample being divided into experimental group taught using coop jigsaw team projects and control group taught using direct instruction. Cluster random sampling was applied as the technique to determine sample. To obtain the data of students‘ speaking score, a speaking test was conducted. The score was the average score resulted by two independent examiners. The data were analysed through descriptive and inferential analysis using two-sample t-test. The research hypothesised that coop jigsaw will result a better English speaking score rather than direct instruction method. The research finding using 95% significance level shows that coop jigsaw team projects was more effective in teaching speaking compared to direct instruction for the tenth grade students because the activities in coop jigsaw team project pushed the students to be more active and cooperative in learning speaking.

  13. SELECTING WORKING TEAMS FOR INFORMATION TECHNOLOGY OUTSOURCING PROJECTS THROUGH A COMBINATION OF METHODOLOGIES

    Directory of Open Access Journals (Sweden)

    María Alejandra Castellini

    Full Text Available ABSTRACT This paper deals with a problem that Information Technology outsourcing suppliers generally face when selecting a working team technically capable for specific roles in software development projects. A combination of methodologies, interactively integrated, is proposed. They are Soft System Methodology to structure the problem, Repertory Grid for individual interviews and elicitation of the selection criteria, DRV Processes to assess the candidates and to generate knowledge and consensus on the selection process and Linear Programming to assign people to each position. This multimethodology allowed finding a more comprehensive solution than that initially requested by the company, since it helped to establish the necessary transformations for the selection model to operate in the right way, set the competencies to be considered as selection criteria, develop a consensus estimate of the weighted criteria, and award global values to candidates, optimizing the assignment of roles in the group for the project.

  14. A model for selecting project team members using multicriteria group decision making

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-04-01

    Full Text Available Selecting a project team is a complex multi-criteria decision-making problem. For this reason, one appropriate way to tackle such problems involves the use of multi-criteria decision aid methods. However, most of the decisions taken regarding the selection of project teams are made by a group of people. It is this which changes the focus of the problem by moving from one decision-maker (DM to a group of DMs. Analysis needs to be extended in order to consider the preference structure of each individual group member. In this paper, we present a group decision model for project team selection based on a multi-criteria evaluation of the preferences of a client's representatives. It could be applied to any decision problem since it involves a group of decision makers whose preferences diverge little. An application of the model in order to select consultants for a construction project is presented.A seleção da equipe em um projeto é um problema de decisão multicritério. Uma forma apropriada de tratar tais problemas envolve o uso de métodos de apoio multicritério a decisão. Grande parte desses problemas envolve um grupo de decisores. Dessa forma, há uma mudança no foco da decisão de um decisor para um grupo de decisores. A análise deve ser ampliada no intuito de considerar a estrutura de preferência de cada membro do grupo. Nesse artigo, apresentamos um modelo aplicado à seleção de equipe de um projeto baseado na avaliação multicritério das preferências dos representantes do cliente do projeto. Pode ser aplicado a qualquer problema de decisão desde que envolva um grupo de decisores que tenham pequena divergência em relação às suas preferências. Uma aplicação para seleção de parte da equipe de um projeto de construção é apresentada.

  15. Code of Conduct for wind-power projects - Phase 3; Code of Conduct fuer windkraftprojekte. Phase 3 Machbarkeit und Strategie

    Energy Technology Data Exchange (ETDEWEB)

    Strub, P. [Pierre Strub, freischaffender Berater, Binningen (Switzerland); Ziegler, Ch. [Inter Act, Basel (Switzerland)

    2008-11-15

    This paper discusses the results of phase three of a project concerning wind-power projects. Feasibility and strategy aspects are examined and discussed. The current state of the wind power market is discussed on the basis of the results of a survey made on the subject. The social acceptance of wind power installations is discussed, whereby the rejection of particular projects is compared with a general lack of acceptance. Requirements placed on such projects and possible solutions are discussed. Finally, the feasibility of setting up a code of conduct in the area of wind-power projects is discussed and the definition of further instruments is examined

  16. One System Integrated Project Team Progress in Coordinating Hanford Tank Farms and the Waste Treatment Plant

    International Nuclear Information System (INIS)

    Skwarek, Raymond J.; Harp, Ben J.; Duncan, Garth M.

    2013-01-01

    The One System Integrated Project Team (IPT) was formed at the Hanford Site in late 2011 as a way to improve coordination and itegration between the Hanford Tank Waste Treatment and Immobilization Plant (WTP) and the Tank Operations Contractor (TOC) on interfaces between the two projects, and to eliminate duplication and exploit opportunities for synergy. The IPT is composed of jointly staffed groups that work on technical issues of mutal interest, front-end design and project definition, nuclear safety, plant engineering system integration, commissioning, planning and scheduling, and environmental, safety, health and quality (ESH&Q) areas. In the past year important progress has been made in a number of areas as the organization has matured and additional opportunities have been identified. Areas covered in this paper include: Support for development of the Office of Envirnmental Management (EM) framework document to progress the Office of River Protection's (ORP) River Protection Project (RPP) mission; Stewardship of the RPP flowsheet; Collaboration with Savannah River Site (SRS), Savannah River National Laboratory (SRNL), and Pacific Northwest National Laboratory (PNNL); Operations programs integration; and, Further development of the waste acceptance criteria

  17. Evaluation of a Pilot Project to Introduce Simulation-Based Team Training to Pediatric Surgery Trauma Room Care

    Directory of Open Access Journals (Sweden)

    Markus Lehner

    2017-01-01

    Full Text Available Introduction. Several studies in pediatric trauma care have demonstrated substantial deficits in both prehospital and emergency department management. Methods. In February 2015 the PAEDSIM collaborative conducted a one and a half day interdisciplinary, simulation based team-training course in a simulated pediatric emergency department. 14 physicians from the medical fields of pediatric surgery, pediatric intensive care and emergency medicine, and anesthesia participated, as well as four pediatric nurses. After a theoretical introduction and familiarization with the simulator, course attendees alternately participated in six simulation scenarios and debriefings. Each scenario incorporated elements of pediatric trauma management as well as Crew Resource Management (CRM educational objectives. Participants completed anonymous pre- and postcourse questionnaires and rated the course itself as well as their own medical qualification and knowledge of CRM. Results. Participants found the course very realistic and selected scenarios highly relevant to their daily work. They reported a feeling of improved medical and nontechnical skills as well as no uncomfortable feeling during scenarios or debriefings. Conclusion. To our knowledge this pilot-project represents the first successful implementation of a simulation-based team-training course focused on pediatric trauma care in German-speaking countries with good acceptance.

  18. Intra project team disagreement, conflict communications, and team performance in cross-functional new product teams: A decision-making quality perspective

    Directory of Open Access Journals (Sweden)

    Tsun Jin Chang

    2014-02-01

    Full Text Available This paper develops and examines a model of the antecedents and consequences of decision-making comprehensiveness during the new product development process. This model firstly suggests a concave relationship between intrateam task disagreement and decision-making comprehensiveness. It also conjectures that conflict communications influence the effectiveness of decision-making comprehensiveness on new product teams’ performance. An empirical test of the proposed framework involves a survey of 220 cross-functional new product teams. The findings show that an inverse U-shaped relationship exists between intrateam task disagreement and decision-making comprehensiveness. It also indicates that collaborative communication has a negative effect on innovativeness, whereas contentious communication adversely affects constraint adherence. However, decision-making comprehensiveness partially moderates the relationships between conflict communications and team performance. Some managerial and research implications of the findings were also discussed in this study.

  19. Balancing creativity and time efficiency in multi-team R&D projects : the alignment of formal and informal networks

    NARCIS (Netherlands)

    Kratzer, Jan; Gemuenden, Hans Georg; Lettl, Christopher

    2008-01-01

    The business world is denoted by an increasing number of multi-team research and development (R&D) projects, however, managerial knowledge about how to run them successfully is scarce. The present study attempts to shed light at this kind of projects by investigating the alignment of formal and

  20. A Simplified Model of Human Alcohol Metabolism That Integrates Biotechnology and Human Health into a Mass Balance Team Project

    Science.gov (United States)

    Yang, Allen H. J.; Dimiduk, Kathryn; Daniel, Susan

    2011-01-01

    We present a simplified human alcohol metabolism model for a mass balance team project. Students explore aspects of engineering in biotechnology: designing/modeling biological systems, testing the design/model, evaluating new conditions, and exploring cutting-edge "lab-on-a-chip" research. This project highlights chemical engineering's impact on…

  1. Designing and conducting health system research projects, volume ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    These 'green modules'* found their way to Malaysia, where Indra ..... They determine nutritional and hygiene practices, alert children to dangers, provide care in ... money from taxes and donor agencies to finance the health care system. .... The principle of cost-effectiveness is important in the selection of research projects.

  2. Using UAVs to Conduct Student-led Research Projects

    Science.gov (United States)

    Olds, S. E.; Lewis, P. M., Jr.

    2016-12-01

    Recreational drones can inspire students to initiate research projects. These "toys" have a low cost (Arduino board, SABEL collects temperature, humidity, and GPS position. This presentation will provide examples of student-led investigations, instructions for building the SABEL sensor package, and the status of the new e-book compilation of student-focused activities using recreational drones to pursue science, math, engineering, and technology research investigations.

  3. Investigating the extent to which mobile phones reduce Knowledge Transfer barriers in Student Project Teams

    Directory of Open Access Journals (Sweden)

    Michael E. Kyobe

    2011-03-01

    Full Text Available Group learning plays a key role in the transfer of knowledge. In institutions of learning, it enhances students’ understanding, critical thinking, integration of knowledge and knowledge sharing. However, the transfer of knowledge in group projects is often impeded by factors such as time and budget constraints, individual and social barriers, and a lack of motivation.Institutions of learning are increasingly adopting information and communication technologies (e.g. mobile technologies to provide solutions to the challenges facing them. Whilst the integration of the mobile context and technologies in learning environment has been encouraged over the years, and indeed many students today can use mobile phones, the effectiveness of these technologies in reducing impediments to knowledge transfer in group learning has not been investigated.This study investigated the extent to which mobile phones reduce the barriers to knowledge transfer in project groups. The impediments examined include the nature of knowledge, social barriers, lack of time and lack of motivation. Quantitative and qualitative approaches were used to collect and analyse the data. The sample consisted of 85 students engaged in group projects in the departments of Information Systems, Civil Engineering, Computer Science and Construction Engineering.The results show that mobile phones reduce all four knowledge transfer barriers investigated in the project groups. We found no significant difference in the nature of knowledge shared by teams with weak and strong ties. This suggests that teams with weak social ties who normally experience difficulty sharing complex (tacit knowledge can easily do so with the aid of mobile facilities. In addition, frequent users of mobile phones were motivated to share explicit knowledge with their peers whilst those who often work with tacit knowledge could convert it to explicit form and share it with others. Mobile features like short messaging

  4. 34 CFR 1100.30 - Where may the fellowship project be conducted?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false Where may the fellowship project be conducted? 1100.30... Must Be Met by a Fellow? § 1100.30 Where may the fellowship project be conducted? (a) A fellow is encouraged to carry out all, or a portion of, the fellowship project at the Institute. At a minimum, a fellow...

  5. Challenges and Approaches to Make Multidisciplinary Team Meetings Interoperable - The KIMBo Project.

    Science.gov (United States)

    Krauss, Oliver; Holzer, Karl; Schuler, Andreas; Egelkraut, Reinhard; Franz, Barbara

    2017-01-01

    Multidisciplinary team meetings (MDTMs) are already in use for certain areas in healthcare (e.g. treatment of cancer). Due to the lack of common standards and accessibility for the applied IT systems, their potential is not yet completely exploited. Common requirements for MDTMs shall be identified and aggregated into a process definition to be automated by an application architecture utilizing modern standards in electronic healthcare, e.g. HL7 FHIR. To identify requirements, an extensive literature review as well as semi-structured expert interviews were conducted. Results showed, that interoperability and flexibility in terms of the process are key requirements to be addressed. An architecture blueprint as well as an aggregated process definition were derived from the insights gained. To evaluate the feasibility of identified requirements, methods of explorative prototyping in software engineering were used. MDTMs will become an important part of modern and future healthcare but the need for standardization in terms of interoperability is imminent.

  6. The impact of team cognitive styles on performance of radical and incremental NPD projects

    NARCIS (Netherlands)

    de Visser, Matthias; Faems, Dries; Visscher, Klaasjan; de Weerd-Nederhof, Petronella C.

    2014-01-01

    Although prior studies increased our understanding of the performance implications of new product development (NPD) team members’ functional backgrounds and demographic variables, they remained relatively silent on the impact of underlying psychological characteristics such as the team members’

  7. The Impact of Team Cognitive Styles on Performance of Radical and Incremental NPD Projects

    NARCIS (Netherlands)

    de Visser, Matthias; Faems, Dries; Visscher, Klaasjan; de Weerd-Nederhof, Petra

    2014-01-01

    Although prior studies increased our understanding of the performance implications of new product development (NPD) team members' functional backgrounds and demographic variables, they remained relatively silent on the impact of underlying psychological characteristics such as the team members'

  8. Investigating the extent to which mobile phones reduce Knowledge Transfer barriers in Student Project Teams

    Directory of Open Access Journals (Sweden)

    Michael E. Kyobe

    2011-10-01

    Institutions of learning are increasingly adopting information and communication technologies (e.g. mobile technologies to provide solutions to the challenges facing them. Whilst the integration of the mobile context and technologies in learning environment has been encouraged over the years, and indeed many students today can use mobile phones, the effectiveness of these technologies in reducing impediments to knowledge transfer in group learning has not been investigated. This study investigated the extent to which mobile phones reduce the barriers to knowledge transfer in project groups. The impediments examined include the nature of knowledge, social barriers, lack of time and lack of motivation. Quantitative and qualitative approaches were used to collect and analyse the data. The sample consisted of 85 students engaged in group projects in the departments of Information Systems, Civil Engineering, Computer Science and Construction Engineering. The results show that mobile phones reduce all four knowledge transfer barriers investigated in the project groups. We found no significant difference in the nature of knowledge shared by teams with weak and strong ties. This suggests that teams with weak social ties who normally experience difficulty sharing complex (tacit knowledge can easily do so with the aid of mobile facilities. In addition, frequent users of mobile phones were motivated to share explicit knowledge with their peers whilst those who often work with tacit knowledge could convert it to explicit form and share it with others. Mobile features like short messaging service and multimedia messaging service (SMS & MMS or what some people refer to as ‘texting’, and email were mainly used to share knowledge and were perceived to reduce knowledge transfer time more than voice facilities. Our findings indicate that most students do not utilise the affordances of mobile phones for tacit knowledge transfer. Sharing of tacit knowledge needs to be encouraged

  9. Evaluation of an Initiative for Fostering Provider-Pharmacist Team Management of Hypertension in Communities

    OpenAIRE

    William R. Doucette; Cailin Lickteig; Stevie Veach; Barry Carter; Barcey Levy

    2014-01-01

    Objectives: 1) Conduct team building activities for provider-community pharmacist teams in small communities and 2) Determine the impact of the team approach on practitioner-reported consequences and 3) Identify obstacles to the team approach and ways to overcome them. Methods: Eleven provider-pharmacist teams were recruited in rural/micropolitan communities in Iowa. The teams participated in team building sessions facilitated by the project leaders, to discuss the team approach. Decisio...

  10. Managing Large Scale Project Analysis Teams through a Web Accessible Database

    Science.gov (United States)

    O'Neil, Daniel A.

    2008-01-01

    Large scale space programs analyze thousands of requirements while mitigating safety, performance, schedule, and cost risks. These efforts involve a variety of roles with interdependent use cases and goals. For example, study managers and facilitators identify ground-rules and assumptions for a collection of studies required for a program or project milestone. Task leaders derive product requirements from the ground rules and assumptions and describe activities to produce needed analytical products. Disciplined specialists produce the specified products and load results into a file management system. Organizational and project managers provide the personnel and funds to conduct the tasks. Each role has responsibilities to establish information linkages and provide status reports to management. Projects conduct design and analysis cycles to refine designs to meet the requirements and implement risk mitigation plans. At the program level, integrated design and analysis cycles studies are conducted to eliminate every 'to-be-determined' and develop plans to mitigate every risk. At the agency level, strategic studies analyze different approaches to exploration architectures and campaigns. This paper describes a web-accessible database developed by NASA to coordinate and manage tasks at three organizational levels. Other topics in this paper cover integration technologies and techniques for process modeling and enterprise architectures.

  11. Playing with the team: The Development of Communities of Practice in a Digital Storytelling Project

    Directory of Open Access Journals (Sweden)

    Peter John Westman

    2012-12-01

    Full Text Available Since its emergence in the early 1990's, digital storytelling has been variouslyidentified as a new media practice, a consumer and community-led movement,and a textual system. However, given its relative nascent status, there remainsthe need for further academic research focusing on the different forms it hasassumed. During the spring/summer of 2011, I conducted an examination ofTaking the Field (TTF, a digital storytelling project that aims to celebrategrassroots cricket in the UK through the construction of stories by village andcounty-level clubs. In contrast to most previous projects that aim to have theparticipants “speak” by constructing their own stories, TTF stories are researchedand constructed by project staff with the assistance of the clubs.My research centers on the experiences of two clubs in the project, Blaina CC andSpondon CC, through interviews and elicitation techniques with club andcommunity members using the completed stories and the artifacts used in theirconstruction. Through the theoretical framework of Gell's anthropology of art, Iconsider how digital stories act as objects that mediate social agency during theircreation and how the structure of this type of project contributes to the formationof communities of practice in the 'performance' of collective identity.

  12. Are the resources adoptive for conducting team-based diabetes management clinics? An explorative study at primary health care centers in Muscat, Oman.

    Science.gov (United States)

    Al-Alawi, Kamila; Johansson, Helene; Al Mandhari, Ahmed; Norberg, Margareta

    2018-05-08

    AimThe aim of this study is to explore the perceptions among primary health center staff concerning competencies, values, skills and resources related to team-based diabetes management and to describe the availability of needed resources for team-based approaches. The diabetes epidemic challenges services available at primary health care centers in the Middle East. Therefore, there is a demand for evaluation of the available resources and team-based diabetes management in relation to the National Diabetes Management Guidelines. A cross-sectional study was conducted with 26 public primary health care centers in Muscat, the capital of Oman. Data were collected from manual and electronic resources as well as a questionnaire that was distributed to the physician-in-charge and diabetes management team members.FindingsThe study revealed significant differences between professional groups regarding how they perceived their own competencies, values and skills as well as available resources related to team-based diabetes management. The perceived competencies were high among all professions. The perceived team-related values and skills were also generally high but with overall lower recordings among the nurses. This pattern, along with the fact that very few nurses have specialized qualifications, is a barrier to providing team-based diabetes management. Participants indicated that there were sufficient laboratory resources; however, reported that pharmacological, technical and human resources were lacking. Further work should be done at public primary diabetes management clinics in order to fully implement team-based diabetes management.

  13. The Advanced Interdisciplinary Research Laboratory: A Student Team Approach to the Fourth-Year Research Thesis Project Experience

    Science.gov (United States)

    Piunno, Paul A. E.; Boyd, Cleo; Barzda, Virginijus; Gradinaru, Claudiu C.; Krull, Ulrich J.; Stefanovic, Sasa; Stewart, Bryan

    2014-01-01

    The advanced interdisciplinary research laboratory (AIRLab) represents a novel, effective, and motivational course designed from the interdisciplinary research interests of chemistry, physics, biology, and education development faculty members as an alternative to the independent thesis project experience. Student teams are assembled to work…

  14. Low Emissions Alternative Power (LEAP) Project Office Business Team of the Aeropropulsion Research Program Office (ARPO) Org. 0140

    Science.gov (United States)

    Buttler, Jennifer A.

    2004-01-01

    The program for which I am working at this summer is Propulsion and Power/Low Emissions Alternative Power (P&P/LEAP). It invests in a fundamental TRL 1-6 research and technology portfolio that will enable the future of: Alternative fuels and/or alternative propulsion systems, non-combustion (electric) propulsion systems. P&P/LEAP will identify and capitalize on the highest potential concepts generated both internal and external to the Agency. During my 2004 summer at NASA Glenn Research Center, I worked with my mentor Barbara Mader, in the Project Office with the Business Team completing various tasks for the project and personnel. The LEAP project is a highly matrixed organization. The Project Office is responsible for the goals advocacy and dollar (budget) of the LEAP project. The objectives of the LEAP Project are to discover new energy sources and develop unconventional engines and power systems directed towards greatly reduced emissions, enable new vehicle concepts for public mobility, new science missions and national security. The Propulsion and PowerLow Emissions Alternative Power directly supports the environmental, mobility, national security objectives of the Vehicle Systems Program and the Aeronautics Technology Theme. Technology deliverables include the demonstration through integrated ground tests, a constant volume combustor in an engine system, and UAV/small transport aircraft all electric power system. My mentor serves as a key member of the management team for the Aeropropulsion Research Program Office (ARPO). She has represented the office on numerous occasions, and is a member of a number of center-wide panels/teams, such as the Space management Committee and is chair to the Business Process Consolidation Team. She is responsible for the overall coordination of resources for the Propulsion and Power Project - from advocacy to implementation. The goal for my summer at NASA was to document processes and archive program documents from the past

  15. Code of Conduct for wind-power projects - Feasibility study; Code of Conduct fuer windkraftprojekte. Machbarkeitsstudie - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Strub, P. [Pierre Strub, freischaffender Berater, Binningen (Switzerland); Ziegler, Ch. [Inter Act, Basel (Switzerland)

    2009-02-15

    This final report deals with the results of a feasibility study concerning the development of a Code of Conduct for wind-power projects. The aim is to strengthen the acceptance of wind-power by the general public. The necessity of new, voluntary market instruments is discussed. The urgency of development in this area is quoted as being high, and the authors consider the feasibility of the definition of a code of conduct as being proven. The code of conduct can, according to the authors, be of use at various levels but primarily in project development. Further free-enterprise instruments are also suggested that should help support socially compatible and successful market development. It is noted that the predominant portion of those questioned are prepared to co-operate in further work on the subject

  16. Validation of Early Detection Ovarian Cancer Biomarkers (Team Project) — EDRN Public Portal

    Science.gov (United States)

    Early detection of Ovarian Cancer (OC) is one of the key clinical problems in this disease. We propose a team EDRN project to address the issue of early detection of OC by performing a validation study on candidate protein markers already identified in previous EDRN research or in the literature (e.g. protein products of TCGA identified mutations specific to ovarian cancer). (See appendix for full listing) Biospecimen sources have been identified which include samples obtained at diagnosis and matched controls (Urban, Godwin, Marks, Skates), and longitudinal samples obtained prior to diagnosis (Urban, Skates, Godwin). Bioinformatic filters will be applied to rank the candidates (Diamandis). In order of ranking, candidate proteins for which high quality antibodies are available will be measured by development of ELISAs at JHU (Chan/Zhang) or through NAPPA at DFCI (Anderson/LaBaer), while for other candidates mass spectrometry based selective reaction monitoring (SRM) assays will be developed at PNNL (Rodland). Three milestones are defined. The first two milestones are to assemble the necessary specimens and to develop the qualifying assay(s). The final milestone is to estimate the markers’ sensitivity one year prior to diagnosis at a given high specificity.

  17. Improving communication between obstetric and neonatology teams for high-risk deliveries: a quality improvement project.

    Science.gov (United States)

    Sundgren, Nathan C; Kelly, Frances C; Weber, Emily M; Moore, Merle L; Gokulakrishnan, Ganga; Hagan, Joseph L; Brand, M Colleen; Gallegos, Jennifer O; Levy, Barbara E; Fortunov, Regine M

    2017-01-01

    Summoning is a key component of communication between obstetrics and neonatal resuscitation team (NRT) in advance of deliveries. A paging system is a commonly used summoning tool. The timeliness and information contained in the page help NRT to optimally prepare for postdelivery infant care. Our aim was to increase the frequency that summoning pages contained gestational age and reason for NRT attendance to >90%. At baseline, 8% of pages contained gestational age and 33% of pages contained a reason for NRT attendance. Sequential Plan-Do-Study-Act cycles were used as our model for quality improvement. During the 8-month improvement period, the per cent of pages increased to 97% for gestational age and 97% for reason for NRT attendance. Measures of page timeliness, our balancing measure, did not change. Summoning communication between obstetric and NRT is crucial for optimal perinatal outcomes. The active involvement of all stakeholders throughout the project resulted in the development of a standardised paging tool and a more informative paging process, which is a key communication tool used in many centres.

  18. Rural interdisciplinary mental health team building via satellite: a demonstration project.

    Science.gov (United States)

    Cornish, Peter A; Church, Elizabeth; Callanan, Terrence; Bethune, Cheri; Robbins, Carl; Miller, Robert

    2003-01-01

    This paper reports on the results of a demonstration project that examined the role of telehealth/telemedicine (hereafter referred to as telehealth) in providing interdisciplinary mental health training and support to health professionals in a rural region of Atlantic Canada. Special emphasis was placed on addressing the question of how training might affect interdisciplinary collaboration among the rural health professionals. Five urban mental health professionals from three disciplines provided training and support via video-satellite and internet, print and video resources to 34 rural health and community professionals. In order to assess the rural community's needs and the impact of the interventions, questionnaires were administered and on-site interviews were conducted before and after the project. Throughout the project, field notes were recorded and satisfaction ratings were obtained. Satisfaction with the video-satellite presentations was high and stable, with the exception of one session when signal quality was very poor. Rural participants were most satisfied with opportunities for interaction and least satisfied with the variable quality of the video transmission signal. High staff turnover among rural professionals resulted in insufficient power to permit statistical analysis. Positive reports of the project impact included expanded knowledge and heightened sensitivity to mental health issues, increased cross-disciplinary connections, and greater cohesion among professionals. The results suggest that, with some refinements, telehealth technology can be used to facilitate mental health training and promote interdisciplinary collaboration among professionals in a rural setting.

  19. Using implementation tools to design and conduct quality improvement projects for faster and more effective improvement.

    Science.gov (United States)

    Ovretveit, John; Mittman, Brian; Rubenstein, Lisa; Ganz, David A

    2017-10-09

    Purpose The purpose of this paper is to enable improvers to use recent knowledge from implementation science to carry out improvement changes more effectively. It also highlights the importance of converting research findings into practical tools and guidance for improvers so as to make research easier to apply in practice. Design/methodology/approach This study provides an illustration of how a quality improvement (QI) team project can make use of recent findings from implementation research so as to make their improvement changes more effective and sustainable. The guidance is based on a review and synthesis of improvement and implementation methods. Findings The paper illustrates how research can help a quality project team in the phases of problem definition and preparation, in design and planning, in implementation, and in sustaining and spreading a QI. Examples of the use of different ideas and methods are cited where they exist. Research limitations/implications The example is illustrative and there is little limited experimental evidence of whether using all the steps and tools in the one approach proposed do enable a quality team to be more effective. Evidence supporting individual guidance proposals is cited where it exists. Practical implications If the steps proposed and illustrated in the paper were followed, it is possible that quality projects could avoid waste by ensuring the conditions they need for success are in place, and sustain and spread improvement changes more effectively. Social implications More patients could benefit more quickly from more effective implementation of proven interventions. Originality/value The paper is the first to describe how improvement and implementation science can be combined in a tangible way that practical improvers can use in their projects. It shows how QI project teams can take advantage of recent advances in improvement and implementation science to make their work more effective and sustainable.

  20. Distant yet Near: Promoting Interdisciplinary Learning in Significantly Diverse Teams through Socially Responsible Projects

    Science.gov (United States)

    Adya, Monica; Temple, Bryan K.; Hepburn, Donald M.

    2015-01-01

    With global specialization of work units within organizations, interdisciplinary work practices comprised of collaborative efforts between technical and business teams are increasingly common in today's workplace. While higher education has responded by creating opportunities for remote teams to learn from collaborative work, occasions for…

  1. Teaming up

    DEFF Research Database (Denmark)

    Warhuus, Jan; Günzel-Jensen, Franziska; Robinson, Sarah

    2016-01-01

    types of team formation: random teacher pre-assigned, student selection, and teacher directed diversity. In each of these modules, ethnographic methods (interviews and observations) were employed. Additionally, we had access to students learning logs, formative and summative assessments, and final exams...... functioning entrepreneurial student teams as most teams lack personal chemistry which makes them anchor their work too much in a pre-defined project. In contrast, we find that students that can form their own teams aim for less diverse teams than what is achieved by random assignment. However, the homophily......Questions we care about (Objectives): When students have to work on challenging tasks, as it is often the case in entrepreneurship classrooms that leverage experiential learning, team success becomes central to the students learning. Yet, the formation of teams is often left up to the students...

  2. Research 0n Incentive Mechanism of General Contractor and Subcontractors Dynamic Alliance in Construction Project Based on Team Cooperation

    Science.gov (United States)

    Yin, Honglian; Sun, Aihua; Liu, Quanru; Chen, Zhiyi

    2018-03-01

    It is the key of motivating sub-contractors working hard and mutual cooperation, ensuring implementation overall goal of the project that to design rational incentive mechanism for general contractor. Based on the principal-agency theory, the subcontractor efforts is divided into two parts, one for individual efforts, another helping other subcontractors, team Cooperation incentive models of multiple subcontractors are set up, incentive schemes and intensities are also given. The results show that the general contractor may provide individual and team motivation incentives when subcontractors working independently, not affecting each other in time and space; otherwise, the general contractor may only provide individual incentive to entice teams collaboration between subcontractors and helping each other. The conclusions can provide a reference for the subcontract design of general and sub-contractor dynamic alliances.

  3. Continuous outreach activities performed by a student project team of undergraduates and their program topics in optics and photonics

    Science.gov (United States)

    Hasegawa, Makoto; Tokumitsu, Seika

    2016-09-01

    The out-of-curriculum project team "Rika-Kobo", organized by undergraduate students, has been actively engaged in a variety of continuous outreach activities in the fields of science and technology including optics and photonics. The targets of their activities cover wide ranges of generations from kids to parents and elderly people, with aiming to promote their interests in various fields of science and technologies. This is an out-of-curriculum project team with about 30 to 40 undergraduate students in several grades and majors. The total number of their activities per year tends to reach 80 to 90 in recent years. Typical activities to be performed by the project team include science classes in elementary and/or secondary schools, science classes at other educational facilities such as science museums, and experiment demonstrations at science events. Popular topics cover wide ranges from explanations and demonstrations of nature phenomena, such as rainbow colors, blue sky, sunset color, to demonstration experiments related to engineering applications, such as polarization of light, LEDs, and optical communications. Experimental topics in optics and photonics are especially popular to the audiences. Those activities are very effective to enhance interests of the audiences in learning related knowledges, irrespective of their generations. Those activities are also helpful for the student members to achieve and/or renew scientific knowledges. In addition, each of the activities provides the student members with effective and advantageous Project-Based-Learning (PBL) style experiences including manufacturing experiences, which are advantageous to cultivate their engineering skills.

  4. Integrating Public Health and Health Promotion Practice in the Medical Curriculum: A Self-Directed Team-Based Project Approach

    Directory of Open Access Journals (Sweden)

    Geraldine Kershaw

    2017-08-01

    Full Text Available Preparing health professionals in health promotion (HP and disease prevention is essential for improvement of population health, community HP, and better health care for individuals. The aim of this article is to describe an HP project in the form of a major self-directed project-based learning task integrated within the curriculum in the second year of the medical degree program at United Arab Emirates University. The project introduces students to public health and HP practice and develops students’ literature searching, writing, presentation skills, and team work. Students learn the principles underlying behavioral change, and the design of HP programs and materials, through a lecture format. Small groups of students each choose a specific health topic for their project. Over 11 weeks, students obtain information about their topic from appropriate sources (library, PubMed, Google Scholar, credible health sources such as World Health Organization. Using the principles learned in the lectures, they develop appropriate materials for their target audience: for example, posters, a pamphlet, social media content, or a video or radio message. Students seek advice from specialist faculty as needed. In week 12, each team presents their project background, rationale, and materials to their colleagues in a seminar format open to all faculty. They then submit the materials they developed for assessment. Group marks are assigned for presentations and materials. Key concepts are assessed by multiple choice questions in comprehensive course examinations. By participation in the HP project, many students develop a solid background in prevention. The information retrieval, writing, and presentation skills, as well as experience of team work, are valuable both for the remaining years of their training and their future careers.

  5. A summary of lessons learned activities conducted at the OECD Halden Reactor Project

    International Nuclear Information System (INIS)

    Hallbert, B.P.

    1997-01-01

    A series of lessons learned studies have been conducted at the OECD Halden Reactor Project. The purpose of these lessons learned reports are to summarize knowledge and experience gained across a number of research project. This paper presents a summary of main issues addressed in four of these lessons learned projects. These are concerned with software development and quality assurance, software reliability, methods for test and evaluation of developed systems, and the evaluation of system design features

  6. "Saturday Night Live" Goes to High School: Conducting and Advising a Political Science Fair Project

    Science.gov (United States)

    Allen, Meg; Brewer, Paul R.

    2010-01-01

    This article uses a case study to illustrate how science fair projects--which traditionally focus on "hard science" topics--can contribute to political science education. One of the authors, a high school student, conducted an experimental study of politics for her science fair project. The other author, a faculty member, was asked to advise the…

  7. Identifying Coordination Problems in Software Development : Finding Mismatches between Software and Project Team Structures

    NARCIS (Netherlands)

    Amrit, Chintan Amrit; van Hillegersberg, Jos; Kumar, Kuldeep

    2012-01-01

    Today’s dynamic and iterative development environment brings significant challenges for software project management. In distributed project settings, “management by walking around” is no longer an option and project managers may miss out on key project insights. The TESNA (TEchnical Social Network

  8. Improving Scientific Research Methodology in Undergraduate Medical Students: a case of team based training blended in a research project

    Institute of Scientific and Technical Information of China (English)

    W.Zhang; C.Cambier; Y.Zhang; J.M.Vandeweerd; P.Gustin

    2014-01-01

    An educational intervention targeting medical students and aiming to develop skills useful to the writing of a health science research protocol over a short period of time has been developed in the Shanghai Jiao Tong University School of Medicine. The methodology blending the principles of PBL and TBL is detailed and key issues of this implementation are discussed. Twenty-one students were enrolled in a research master degree and participated to three mandatory 180-minutes sessions. Beyond classical skills useful to solve a problem, this new intervention focused on the transformation of knowledge to create an authentic content, which is a feature of the project-based learning(PBL). The training process was designed according to team-based learning(TBL) procedure except that work sharing between groups and pooling resources and outcomes of each group allowed the construction of one final class original research project in the field of respiratory pharmacology. The combination of both learning methods allowed promoting individual and group accountability necessary to improve self-learning and the quality of the final joint project. The peer reviewing was an essential factor in creating the students’ motivation and improving of team discussion. The grades individually assigned for skills and quality of the project by an external teacher suggested that key objectives of the intervention were reached. In conclusion, the educational intervention described in this paper appears as an appropriate method to develop specific skills necessary to write and discuss a research project within a research team.Further works are necessary to measure the degree of satisfaction of students and improvement of performance.

  9. The SOLA Team: A Star Formation Project To Study the Soul of Lupus with ALMA

    Science.gov (United States)

    De Gregorio-Monsalvo, Itziar; Saito, M.; Rodon, J.; Takahashi, S.

    2017-06-01

    The SOLA team is a multi-national and multi-wavelength collaboration composed by scientists with technical expertise in ALMA and in infrared and optical techniques. The aim of the team is to establish a low-mass star formation scenario based on the Lupus molecular clouds. In this talk I will present our unique catalog of pre-stellar and proto-stellar cores toward Lupus molecular clouds, the results on our latest studies in protoplanetary disks, as well as our ALMA Cycle 3 data aiming at testing the formation mechanism of sub-stellar objects in Lupus molecular clouds.

  10. Experiences from a pilot study on how to conduct a qualitative multi-country research project regarding use of antibiotics in Southeast Europe

    DEFF Research Database (Denmark)

    Kaae, Susanne; Sporrong, Sofia Kälvemark; Traulsen, Janine Morgall

    2016-01-01

    regarding how to conduct these types of research projects by evaluating a pilot study of the project. METHODS: Local data collectors conducted the study according to a developed protocol and evaluated the study with the responsible researcher-team from University of Copenhagen. The pilot study focused......BACKGROUND: In 2014, a qualitative multi-country research project was launched to study the reasons behind the high use of antibiotics in regions of Southeast Europe by using previously untrained national interviewers (who were engaged in other antibiotic microbial resistance-related investigations......) to conduct qualitative interviews with local patients, physicians and pharmacists. Little knowledge exists about how to implement qualitative multi-country research collaborations involving previously untrained local data collectors. The aim of this paper was therefore to contribute to the knowledge...

  11. Simulation-based multiprofessional obstetric anaesthesia training conducted in situ versus off-site leads to similar individual and team outcomes: a randomised educational trial

    Science.gov (United States)

    Sørensen, Jette Led; van der Vleuten, Cees; Rosthøj, Susanne; Østergaard, Doris; LeBlanc, Vicki; Johansen, Marianne; Ekelund, Kim; Starkopf, Liis; Lindschou, Jane; Gluud, Christian; Weikop, Pia; Ottesen, Bent

    2015-01-01

    Objective To investigate the effect of in situ simulation (ISS) versus off-site simulation (OSS) on knowledge, patient safety attitude, stress, motivation, perceptions of simulation, team performance and organisational impact. Design Investigator-initiated single-centre randomised superiority educational trial. Setting Obstetrics and anaesthesiology departments, Rigshospitalet, University of Copenhagen, Denmark. Participants 100 participants in teams of 10, comprising midwives, specialised midwives, auxiliary nurses, nurse anaesthetists, operating theatre nurses, and consultant doctors and trainees in obstetrics and anaesthesiology. Interventions Two multiprofessional simulations (clinical management of an emergency caesarean section and a postpartum haemorrhage scenario) were conducted in teams of 10 in the ISS versus the OSS setting. Primary outcome Knowledge assessed by a multiple choice question test. Exploratory outcomes Individual outcomes: scores on the Safety Attitudes Questionnaire, stress measurements (State-Trait Anxiety Inventory, cognitive appraisal and salivary cortisol), Intrinsic Motivation Inventory and perceptions of simulations. Team outcome: video assessment of team performance. Organisational impact: suggestions for organisational changes. Results The trial was conducted from April to June 2013. No differences between the two groups were found for the multiple choice question test, patient safety attitude, stress measurements, motivation or the evaluation of the simulations. The participants in the ISS group scored the authenticity of the simulation significantly higher than did the participants in the OSS group. Expert video assessment of team performance showed no differences between the ISS versus the OSS group. The ISS group provided more ideas and suggestions for changes at the organisational level. Conclusions In this randomised trial, no significant differences were found regarding knowledge, patient safety attitude, motivation or stress

  12. Public summaries of feasibility studies conducted for the trinidad LNG project. Export trade information

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    The study, conducted by The M. W. Kellog Company, was funded by the U.S. Trade and Development Agency on behalf of the National Gas Company of Trinidad and Tobago. It shows the results of Project Definition Phase which was implemented as a follow-up to two previous feasibility studies which were conducted for a LNG plant in Trinidad. The objective of this report is to develop a project design basis and implementation plan plus a cost estimate. The study is divided into the following sections: (1) Introduction; (2) Project Design Basis; (3) Seismic Hazard Assessment; (4) Geotechnical; and (5) Environmental Assessment.

  13. River Protection Project (RPP) Readiness-to-Proceed 2 Internal Independent Review Team Final Report

    International Nuclear Information System (INIS)

    SCHAUS, P.S.

    2000-01-01

    This report describes the results of an independent review team brought in to assess CH2M HILL Hanford's readiness and ability to support the RPP's move into its next major phase - retrieval and delivery of tank waste to the Privatization Contractor

  14. River Protection Project (RPP) Readiness-to-Proceed 2 Internal Independent Review Team Final Report

    International Nuclear Information System (INIS)

    SCHAUS, P.S.

    2000-01-01

    This report describes the results of an independent review team brought in to assess CH2M Hill Hanford Group's readiness and ability to support the RPP's move into its next major phase - retrieval and delivery of tank waste to the Privatization Contractor

  15. Getting More out of Team Projects: Incentivizing Leadership to Enhance Performance

    Science.gov (United States)

    Ferrante, Claudia J.; Green, Steve G.; Forster, William R.

    2006-01-01

    This study addresses changes in student perceptions when team leaders are incentivized. Although the benefits of groupwork have been thoroughly studied and documented, minimizing dysfunctional teamwork may prove difficult because of leadership incentives, social loafing, and organizational justice implications. Using an innovative pedagogical…

  16. Strategic momentum in virtual R&D project teams : a complement to management

    NARCIS (Netherlands)

    Opdenakker, R.J.G.

    2012-01-01

    In recent decades there is a growing interest in working in multidisciplinary teams. A main reason for this is that often solving problems in organisations needs the use of various different expertises. As these expertises often are not to be found concentrated in one place, this interest is

  17. Investigating Antecedents of Task Commitment and Task Attraction in Service Learning Team Projects

    Science.gov (United States)

    Schaffer, Bryan S.; Manegold, Jennifer G.

    2018-01-01

    The authors investigated the antecedents of team task cohesiveness in service learning classroom environments. Focusing on task commitment and task attraction as key dependent variables representing cohesiveness, and task interdependence as the primary independent variable, the authors position three important task action phase processes as…

  18. Incorporating Reflective Practice into Team Simulation Projects for Improved Learning Outcomes

    Science.gov (United States)

    Wills, Katherine V.; Clerkin, Thomas A.

    2009-01-01

    The use of simulation games in business courses is a popular method for providing undergraduate students with experiences similar to those they might encounter in the business world. As such, in 2003 the authors were pleased to find a classroom simulation tool that combined the decision-making and team experiences of a senior management group with…

  19. Deploying Electric Vehicles and Electric Vehicle Supply Equipment: Tiger Teams Offer Project Assistance for Federal Fleets

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-01-02

    To assist federal agencies with the transition to plug-in electric vehicles (PEVs), including battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), FEMP offers technical guidance on electric vehicle supply equipment (EVSE) installations and site-specific planning through partnerships with the National Renewable Energy Laboratory’s EVSE Tiger Teams.

  20. Dream Team--The Case of an Undergraduate Surgical Talent Development Project

    Science.gov (United States)

    Jensen, Rune Dall; Ljungmann, Ken; Christensen, Mette Krogh; Møldrup, Ulla; Grøndal, Anne Krogh; Mogensen, Mads Filtenborg; Seyer-Hansen, Mikkel

    2016-01-01

    To be successful, a surgeon must master a variety of skills. To meet the high demand for surgical expertise, an extracurricular undergraduate project was launched. The extracurricular project consists of hands-on laparoscopic training and a mentorship programme. The project aims to find the best surgical talents among fourth-year medical students.…

  1. Implementing information systems with project teams using ethnographic-action research

    NARCIS (Netherlands)

    Hartmann, Timo; Fischer, Martin; Haymaker, John

    2009-01-01

    Architecture, engineering, and construction (AEC) projects are characterized by a large variation in requirements and work routines. Therefore, it is difficult to develop and implement information systems to support projects. To address these challenges, this paper presents a project-centric

  2. Teaming up

    DEFF Research Database (Denmark)

    Warhuus, Jan; Günzel-Jensen, Franziska; Robinson, Sarah

    or pre-arranged at random. Therefore we investigate the importance of team formation in the entrepreneurial classroom and ask: (i) What are the underlying factors that influence outcomes of teamwork in student groups? (ii) How does team formation influence student perception of learning?, and (iii) Do...... different team formation strategies produce different teamwork and learning outcomes? Approach: We employed a multiple case study design comprising of 38 student teams to uncover potential links between team formation and student perception of learning. This research draws on data from three different....... A rigorous coding and inductive analysis process was undertaken. Pattern and relationship coding were used to reveal underlying factors, which helped to unveil important similarities and differences between student in different teams’ project progress and perception of learning. Results: When students...

  3. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al.

    Energy Technology Data Exchange (ETDEWEB)

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D. [Nuclear Regulatory Commission, Washington, DC (United States)

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation.

  4. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al

    International Nuclear Information System (INIS)

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D.

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation

  5. READINGS FROM THE FORMAL DISCOURSE OF PROJECT MANAGERS REGARDING DIVERSITY IN TEAMS

    Directory of Open Access Journals (Sweden)

    Sandra Regina da Rocha-Pinto

    2012-04-01

    Full Text Available Based on the viewpoint of project managers with regards to diversity, this paper used a phenomenographic method. Fifteen project managers were interviewed. The latter focused primarily on the variety of techniques, rather than on varieties of any other kind. This view of diversity extends beyond those angles generally taken in the literature on the theme which in most instances refer to diversity as based on gender, race and disadvantaged ethnic and minority groups. Additionally, the study brings to light the fact that diversities of knowledge and behavior are as beneficial for the development of projects. Furthermore, communication and the role of the project manager were raised as mitigating factors when it came to diversity. And, lastly, the conclusion arrived at was that project managers have similar discourses which correspond to the recommendation of the main project management manuals. These discourses and forms of expression are in most cases ready-made.

  6. Conducting a Multisite Education Research Project: Strategies to Overcome the Barriers to Achieve the Benefits.

    Science.gov (United States)

    Beischel, Kelly P; Hart, Julie; Turkelson, Sandra L

    2016-01-01

    Multisite education research projects have many benefits as well as perceived barriers. In this article, we share our experiences with a multisite education research project and the barriers we overcame to reap the benefits. The outcome of our research resulted in increased rigor, role-modeling professional collaboration, and promotion of future multisite education studies. The strategies presented in this article will help alleviate perceived barriers and ameliorate the process of conducting multisite education research studies.

  7. Managing Global Virtual Teams across Classrooms, Students and Faculty

    Science.gov (United States)

    Shea, Timothy P.; Sherer, Pamela D.; Quilling, Rosemary D.; Blewett, Craig N.

    2011-01-01

    Virtual teams are becoming commonplace in business today so our business school students should have experience in effectively working in virtual teams. Based on a month-long virtual team project conducted by the authors between classes in South Africa and the United States, this paper discusses the opportunities and challenges of using global…

  8. MicroBooNE project team recognized by Department of Energy | News

    Science.gov (United States)

    Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of

  9. Understanding and managing three-dimensional/four-dimensional model implementations at the project team level

    NARCIS (Netherlands)

    Hartmann, Timo; Levitt, R.

    2010-01-01

    This paper introduces an extant, theoretical, social-psychological model that explains the sense-making processes of project managers confronted with a new technology to improve our understanding of project-based innovation processes. The model represents the interlinked processes through which

  10. Experiential, Collaborative and Team Projects: Communication Audits in the MBA Communication Course

    Science.gov (United States)

    Hart, Claudia; Vroman, Margo; Stulz, Karin

    2015-01-01

    In this paper the authors discuss the challenges and rewards of building a graduate level Managerial Communication course around an experiential communication audit project. The purpose of the project was to provide MBA (Master of Business Administration) students with exposure to the real world responsibilities and demands of working in a complex…

  11. Project CHECO Southeast Asia Report. OV-1/AC-119 Hunter-Killer Team

    Science.gov (United States)

    1972-10-10

    between Phan Rang, Phu Cat , and Danang in order to provide best coverage of the Vietnamese conflict. -- On 16 February 1970, three AC -ll9Ks and 70...SOUTHEAST ASIA D D DDiv AY/XDOSQA I OV-1/ AC -119 " i IWB I HUNTER-KILLER TEAM 19’.1’ CONTINUING REPORT CLASSIFIED Ey 7AFIDOOC DOWNGRADE TjU SECRET...xamination of C urrent, 0 per’tions I~ I fF!lr T I TII TIIII I OV=1/ AC -119 HUNTER-KILLER TEAMI 1 10 OCTOBER 1972 HQ PACAF Directorate of Operations

  12. How Configuration Management (CM) Can Help Project Teams To Innovate and Communicate

    Science.gov (United States)

    Cioletti, Louis

    2009-01-01

    Traditionally, CM is relegated to a support role in project management activities. CM s traditional functions of identification, change control, status accounting, and audits/verification are still necessary and play a vital role. However, this presentation proposes CM s role in a new and innovative manner that will significantly improve communication throughout the organization and, in turn, augment the project s success. CM s new role is elevated to the project management level, above the engineering or sub-project level in the Work Breakdown Structure (WBS), where it can more effectively accommodate changes, reduce corrective actions, and ensure that requirements are clear, concise, and valid, and that results conform to the requirements. By elevating CM s role in project management and orchestrating new measures, a new communication will emerge that will improve information integrity, structured baselines, interchangeability/traceability, metrics, conformance to standards, and standardize the best practices in the organization. Overall project performance (schedule, quality, and cost) can be no better than the ability to communicate requirements which, in turn, is no better than the CM process to communicate project decisions and the correct requirements.

  13. White Paper on the Use of Team Calendars with the JIRA Issue Tracking System and Confluence Collaboration Tools for the xLPR Project

    Energy Technology Data Exchange (ETDEWEB)

    Klasky, Hilda B. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Williams, Paul T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bass, Bennett Richard [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2012-09-01

    ORNL was tasked by xLPR project management to propose a team calendar for use within the xLPR consortium. Among various options that were considered, the approach judged by ORNL to best fit the needs of the xLPR project is presented in this document. The Atlassian Team Calendars plug-in used with the Confluence collaboration tool was recommended for several reasons, including the advantage that it provides for a tight integration between Confluence (found at https://xlpr.ornl.gov/wiki ) and xLPR s JIRA issue tracking system (found at https://xlpr.ornl.gov/jira ). This document is divided into two parts. The first part (Sections 1-6) consists of the white paper, which highlights some of the ways that Team Calendars can improve com mun ication between xLPR project managers, group leads, and team members when JIRA is applied for both issue tracking and change-management activities. Specific points emphasized herein are as follows: The Team Calendar application greatly enhances the added value that the JIRA and Confluence tools bring to the xLPR Project. The Team Calendar can improve com mun ication between xLPR project managers, group leads, and team members when JIRA is applied for both issue tracking and change-management activities. The Team Calendar works across different email tools such as Outlook 2011, Outlook 2010, Outlook 2007, Google Calendars and Mac s iCalendar to name a few. xLPR users can now access the wiki Confluence (with embedded Team Calendars) directly from JIRA without having to re-validate their login. The second part consists of an Annex (Section 7), which describes how users can subscribe to Team Calendars from different calendar applications. Specific instructions are given in the Annex that describe how to Import xLPR Team Calendar to Outlook Version Office 2010 Import xLPR Team Calendar to Outlook Version Office 2007 Subscribe to Team Calendar from Google Calendar The reader is directed to Section 4 for instructions on adding events to the

  14. Problem based Learning versus Design Thinking in Team based Project work

    DEFF Research Database (Denmark)

    Denise J. Stokholm, Marianne

    2014-01-01

    project based learning issues, which has caused a need to describe and compare the two models; in specific the understandings, approaches and organization of learning in project work. The PBL model viewing the process as 3 separate project stages including; problem analysis, problem solving and project......All educations at Aalborg University has since 1974 been rooted in Problem Based Learning (PBL). In 1999 a new education in Industrial design was set up, introducing Design Based Learning (DBL). Even though the two approaches have a lot in common they also hold different understandings of core...... report, with focus on problem solving through analysis. Design Based Learning viewing the process as series of integrated design spaces including; alignment, research, mission, vision, concept, product and process report, with focus on innovative ideation though integration. There is a need of renewing...

  15. Toward Project-based Learning and Team Formation in Open Learning Environments

    NARCIS (Netherlands)

    Spoelstra, Howard; Van Rosmalen, Peter; Sloep, Peter

    2014-01-01

    Open Learning Environments, MOOCs, as well as Social Learning Networks, embody a new approach to learning. Although both emphasise interactive participation, somewhat surprisingly, they do not readily support bond creating and motivating collaborative learning opportunities. Providing project-based

  16. INVESTIGATIVE RESEARCH PROJECTS RELATED TO THE TOHOKU EARTHQUAKE (THE GREAT EAST JAPAN EARTHQUAKE) CONDUCTED IN FUKUSHIMA.

    Science.gov (United States)

    Yamamoto, Toshiyuki; Hashimoto, Yasuhiro; Yoshida, Masayuki; Ohno, Kikuo; Ohto, Hitoshi; Abe, Masafumi

    2015-01-01

    On March 11(th) 2011, the Tohoku region of Japan was struck by catastrophic disasters. Thousands of people were killed due to a magnitude 9.0 earthquake and its subsequent tsunami. Furthermore, a serious nuclear crisis occurred in Fukushima Prefecture as a result of the disasters, and an emergency evacuation was ordered to people living near the nuclear power plants. There was a lot of anxiety regarding lost families as well as the influences of radioactivity on the health of people and their children. Based on these urgent and uncertain situations, a number of research projects were developed at many institutes both inside and outside Fukushima. We herein report the investigative research projects related to the Tohoku Earthquake (The Great East Japan Earthquake) conducted after the disasters. The research projects were reviewed by the Institutional Review Board in Fukushima Medical University during the two years following the disasters. The research projects conducted in universities other than Fukushima Medical University were also examined using questionnaire analysis. Among the research projects conducted in Fukushima Medical University (n=424), 7% (n=32) were disaster-related investigative research. The mean duration planned to pursue the projects was 25.5 months. Among these projects, those focusing on the health of Fukushima citizens were most common (n=9), followed by the influence of chronic exposure of radiation on chronic inflammatory disorders (n=6), and the mental health of Fukushima citizens (n=5). They were carefully reviewed for the purpose, suitability, and necessity from ethical as well as scientific viewpoints. The majority of the research projects focused on the effects of the Tohoku Earthquake and/or chronic exposure to low-dose radioactivity on the health of children and pregnant women, as well as on various disorders, such as mental health and chronic inflammatory diseases. On the other hand, among 58 projects we collected from 22

  17. Evaluation of a Team Project Based Learning Module for Developing Employability Skills

    OpenAIRE

    Janice Whatley

    2012-01-01

    This paper presents a case study, in which a new module, aimed at enhancing students’ employ-ability skills, is evaluated. Employability skills for graduates from higher education are regarded as essential outcomes from their degree programmes, but it can be difficult to provide appropriate opportunities to develop these skills in the context of their studies. This paper describes a new module, called Live Projects, designed to provide project based learning on campus, but involv-ing local bu...

  18. 75 FR 1793 - Study Team for the Los Alamos Historical Document Retrieval and Assessment (LAHDRA) Project

    Science.gov (United States)

    2010-01-13

    ... by the space available. The meeting room accommodates approximately 200 people. Background: Under a... responsibility and resources for conducting analytic epidemiologic investigations of residents of communities in...

  19. Raising the Bar: Challenging Students in a Capstone Project Course with an Android and Mobile Web Parallel Development Team Project

    Science.gov (United States)

    Wong, Wilson; Pepe, James; Englander, Irv

    2017-01-01

    Information systems capstone projects aim to prepare students for what they will encounter in the industry after graduation. Corporate application development is often a complex endeavor that requires coordination between related products. For example, software development in the mobile application sector may require a coordinated parallel…

  20. Preparing the American Soldier in a Brigade Combat Team to Conduct Information Operations in the Contemporary Operational Environment

    National Research Council Canada - National Science Library

    Beckno, Brian T

    2006-01-01

    ...) to conduct Information Operations (IO) in the Contemporary Operational Environment (COE). First, an explanation of IO and its Army applicability is presented using current examples from military operations in Operation Iraqi Freedom (OIF...

  1. Initial evaluation of the effects of an environmental-focused problem-solving intervention for transition-age young people with developmental disabilities: Project TEAM.

    Science.gov (United States)

    Kramer, Jessica M; Helfrich, Christine; Levin, Melissa; Hwang, I-Ting; Samuel, Preethy S; Carrellas, Ann; Schwartz, Ariel E; Goeva, Aleksandrina; Kolaczyk, Eric D

    2018-03-12

    Project TEAM (Teens making Environment and Activity Modifications) teaches transition-age young people with developmental disabilities, including those with co-occurring intellectual or cognitive disabilities, to identify and resolve environmental barriers to participation. We examined its effects on young people's attainment of participation goals, knowledge, problem-solving, self-determination, and self-efficacy. We used a quasi-experimental, repeated measures design (initial, outcome, 6-week follow-up) with two groups: (1) Project TEAM (28 males, 19 females; mean age 17y 6mo); and (2) goal-setting comparison (21 males, 14 females; mean age 17y 6mo). A matched convenience sample was recruited in two US states. Attainment of participation goals and goal attainment scaling (GAS) T scores were compared at outcome. Differences between groups for all other outcomes were analyzed using linear mixed effects models. At outcome, Project TEAM participants demonstrated greater knowledge (estimated mean difference: 1.82; confidence interval [CI]: 0.90, 2.74) and ability to apply knowledge during participation (GAS: t[75]=4.21; CI: 5.21, 14.57) compared to goal-setting. While both groups achieved significant improvements in knowledge, problem-solving, and self-determination, increases in parent reported self-determination remained at 6-week follow-up only for Project TEAM (estimated mean difference: 4.65; CI: 1.32, 7.98). Significantly more Project TEAM participants attained their participation goals by follow-up (Project TEAM=97.6%, goal-setting=77.1%, p=0.009). Both approaches support attainment of participation goals. Although inconclusive, Project TEAM may uniquely support young people with developmental disabilities to act in a self-determined manner and apply an environmental problem-solving approach over time. Individualized goal-setting, alone or during Project TEAM (Teens making Environment and Activity Modifications) appears to support attainment of participation

  2. Leading multi-professional teams in the children’s workforce: an action research project

    Directory of Open Access Journals (Sweden)

    Karen Stuart

    2012-01-01

    Full Text Available Introduction: The 2004 Children Act in the UK saw the introduction of integrated working in children's services. A raft of change followed with processes designed to make joint working easier, and models and theories to support the development of integrated work. This paper explores the links between key concepts and practice. Methods: A practitioner action research approach is taken using an autoethnographic account kept over six months. The research question was, to what extent is this group collaborating? Results: When the architecture of practice was revealed, differences between espoused and real practice could be seen. Whilst understanding and displaying the outward signs of an effective multi professional group, the individuals did not trust one another. This was exhibited by covert interprofessional issues. As a result, collaborative inertia was achieved. This realisation prompted them to participate in further developmental and participative action research. Conclusion: The paper concludes that trust and relational agency are central to effective leadership of multi professional teams.

  3. Leading multi-professional teams in the children's workforce: an action research project.

    Science.gov (United States)

    Stuart, Kaz

    2012-01-01

    The 2004 Children Act in the UK saw the introduction of integrated working in children's services. A raft of change followed with processes designed to make joint working easier, and models and theories to support the development of integrated work. This paper explores the links between key concepts and practice. A practitioner action research approach is taken using an autoethnographic account kept over six months. The research question was, to what extent is this group collaborating? When the architecture of practice was revealed, differences between espoused and real practice could be seen. Whilst understanding and displaying the outward signs of an effective multi professional group, the individuals did not trust one another. This was exhibited by covert interprofessional issues. As a result, collaborative inertia was achieved. This realisation prompted them to participate in further developmental and participative action research. The paper concludes that trust and relational agency are central to effective leadership of multi professional teams.

  4. TEAM-UP PV-friendly pricing projects: Validation of market research and market development

    International Nuclear Information System (INIS)

    Bigger, J.E.; Hester, S.L.

    1997-01-01

    More than two dozen electric utilities in the US have initiated renewable energy programs funded in total or in part by customers willing to pay a premium to either have their utility develop and use renewable technologies or have part of their own electric service needs supplied by renewable energy sources. These programs are beginning to answer key questions regarding the numbers and characteristics of customers that are willing to pay these premiums for clean, nonpolluting energy. Also, economic viability, level of revenue support, and other questions are critical to successful programs. This paper provides information on a number of utility efforts now underway which use photovoltaic (PV) systems and are part of the government-utility industry TEAM-UP program; it will also provide some early findings and perspectives that are coming from these utility efforts around the US

  5. ERATOSTHENES: excellence research Centre for Earth surveillance and space-based monitoring of the environment, the EXCELSIOR Horizon 2020 teaming project

    Science.gov (United States)

    Hadjimitsis, Diofantos G.; Kontoes, Haris; Schreier, Gunter; Ansmann, Albert; Komodromos, George; Themistocleous, Kyriacos; Mamouri, Rodanthi; Michaelides, Silas; Nisantzi, Argyro; Papoutsa, Christiana; Neocleous, Kyriacos; Mettas, Christodoulos; Tzouvaras, Marios; Evagorou, Evagoras; Christofe, Andreas; Melillos, George; Papoutsis, Ioannis

    2017-10-01

    The aim of this paper is to present the strategy and vision to upgrade the existing ERATOSTHENES Research Centre (ERC) established within the Cyprus University of Technology (CUT) into a sustainable, viable and autonomous Centre of Excellence (CoE) for Earth Surveillance and Space-Based Monitoring of the Environment, which will provide the highest quality of related services on the National, European and International levels. EXCELSIOR is a Horizon 2020 Teaming project which addresses a specific challenge defined by the work program, namely, the reduction of substantial disparities in the European Union by supporting research and innovation activities and systems in low performing countries. It also aims at establishing long-term and strategic partnerships between the Teaming partners, thus reducing internal research and innovation disparities within European Research and Innovation landscape. The proposed CoE envisions the upgrading of the existing ERC into an inspiring environment for conducting basic and applied research and innovation in the areas of the integrated use of remote sensing and space-based techniques for monitoring the environment. Environment has been recognized by the Smart Specialization Strategy of Cyprus as the first horizontal priority for future growth of the island. The foreseen upgrade will regard the expansion of this vision to systematic monitoring of the environment using Earth Observation, space and ground based integrated technologies. Such an approach will lead to the systematic monitoring of all three domains of the Environment (Air, Land, Water). Five partners have united to upgrade the existing ERC into a CoE, with the common vision to become a world-class innovation, research and education centre, actively contributing to the European Research Area (ERA). More specifically, the Teaming project is a team effort between the Cyprus University of Technology (CUT, acting as the coordinator), the German Aerospace Centre (DLR), the

  6. Consumer providers' experiences of recovery and concerns as members of a psychiatric multidisciplinary outreach team: A qualitative descriptive study from the Japan Outreach Model Project 2011-2014.

    Directory of Open Access Journals (Sweden)

    Yoshifumi Kido

    Full Text Available The objective of this study was to clarify consumer providers (CPs subjective experiences as members of a psychiatric multidisciplinary outreach team that provided services to individuals with a mental illness living in the community.A qualitative descriptive study was conducted through semi-structured interviews. Participants were clients hired as CPs in the Japanese Outreach Model Project from September 2011 until March 2014. Of the seventeen CPs, nine participated in this study. We looked at the CPs' subjective experiences of fulfillment and difficulty.In the process of providing services, CPs experienced both achievements and concerns. They had a sense of achievement by caring for their clients and they experienced that they themselves were recovering. They were also concerned about having inadequate knowledge and skills to provide psychiatric services to their clients. Further, there were concerns about their dual role on the multidisciplinary team and being support staff while they were still using mental health services themselves.The results show that the activities of CPs included fulfillment, recovery, and dilemmas. Clarifications will likely contribute to an increase in understanding and cooperation between CPs and other professionals with whom they work. Further studies are needed to investigate policies related to mental health consumers who are also providers of mental health services.

  7. Conducting multinational, cross-cultural research in the functional gastrointestinal disorders: issues and recommendations. A Rome Foundation working team report.

    Science.gov (United States)

    Sperber, A D; Gwee, K A; Hungin, A P; Corazziari, E; Fukudo, S; Gerson, C; Ghoshal, U C; Kang, J-Y; Levy, R L; Schmulson, M; Dumitrascu, D; Gerson, M-J; Chen, M; Myung, S-J; Quigley, E M M; Whorwell, P J; Zarzar, K; Whitehead, W E

    2014-11-01

    Cross-cultural, multinational research can advance the field of functional gastrointestinal disorders (FGIDs). Cross-cultural comparative research can make a significant contribution in areas such as epidemiology, genetics, psychosocial modulators, symptom reporting and interpretation, extra-intestinal co-morbidity, diagnosis and treatment, determinants of disease severity, health care utilisation, and health-related quality of life, all issues that can be affected by geographical region, culture, ethnicity and race. To identify methodological challenges for cross-cultural, multinational research, and suggest possible solutions. This report, which summarises the full report of a working team established by the Rome Foundation that is available on the Internet, reflects an effort by an international committee of FGID clinicians and researchers. It is based on comprehensive literature reviews and expert opinion. Cross-cultural, multinational research is important and feasible, but has barriers to successful implementation. This report contains recommendations for future research relating to study design, subject recruitment, availability of appropriate study instruments, translation and validation of study instruments, documenting confounders, statistical analyses and reporting of results. Advances in study design and methodology, as well as cross-cultural research competence, have not matched technological advancements. The development of multinational research networks and cross-cultural research collaboration is still in its early stages. This report is intended to be aspirational rather than prescriptive, so we present recommendations, not guidelines. We aim to raise awareness of these issues and to pose higher standards, but not to discourage investigators from doing what is feasible in any particular setting. © 2014 John Wiley & Sons Ltd.

  8. Business and Industry Project-Based Capstone Courses: A Reflection on the Performance of Student Teams

    Science.gov (United States)

    Maleki, Reza A.

    2009-01-01

    This is the second of two articles in which the author shares experiences gained from the development and delivery of a business/industry project-based capstone course. The course integrates research, proposal development and design experience based on knowledge and skills acquired in earlier coursework. It also incorporates standards and…

  9. Overcoming Barriers between Volunteer Professionals Advising Project-Based Learning Teams with Regulation Tools

    Science.gov (United States)

    Rees Lewis, Daniel G.; Easterday, Matthew W.; Harburg, Emily; Gerber, Elizabeth M.; Riesbeck, Christopher K.

    2018-01-01

    To provide the substantial support required for project-based learning (PBL), educators can incorporate professional experts as "design coaches." However, previous work shows barriers incorporating design coaches who can rarely meet face-to-face: (1) communication online is time-consuming, (2) updating coaches online is not perceived as…

  10. Managing International Consulting Projects and International Business Courses Using Virtual Teams

    Science.gov (United States)

    Prachyl, Cheryl; Quintanilla, Hector; Gutiérrez, Luis Antonio

    2011-01-01

    The Instituto Tecnologico y de Estudios Superiores de Monterrey and Texas Wesleyan University used technology based courses to enhance internationalization of their curricula. These courses required students to use computer technology as the distance communication medium and to complete an applied international consulting project as part of each…

  11. The rational project manager: a thinking team's guide to getting work done

    National Research Council Canada - National Science Library

    Mullins, James; Longman, Andrew

    2005-01-01

    ... into a rational methodology. This process approach continues to be a distinction and strength today, as Jim Schlick still consults for Kepner-Tregoe as a partner and project management expert. He has served as a mentor to the authors in their professional endeavors, and his ideas form the core of the book. The book also relied on sound editing, proofing, formatt...

  12. DSM-IV Diagnosis of Conduct Disorder and Oppositional Defiant Disorder: Implications and Guidelines for School Mental Health Teams.

    Science.gov (United States)

    Atkins, Marc S.; McKay, Mary McKernan; Talbott, Elizabeth; Arvanitis, Patrice

    1996-01-01

    Reviews the DSM-IV criteria for conduct disorder (CD) and oppositional defiant disorder (ODD), comparing their counterparts in DSM-III-R. Results from DSM-IV field trials indicate interrater and test-retest reliability were only marginally improved compared to prior criteria. Although overlooked in DSM-IV, community factors, gender differences,…

  13. Multidisciplinary team approach to traumatic spinal cord injuries: a single institution's quality improvement project.

    Science.gov (United States)

    Alizo, Georgina; Sciarretta, Jason D; Gibson, Stefanie; Muertos, Keely; Holmes, Sharon; Denittis, Felicia; Cheatle, Joseph; Davis, John; Pepe, Antonio

    2018-04-01

    A stepwise multidisciplinary team (MDT) approach to the injured trauma patient has been reported to have an overall benefit, with reduction in mortality and improved morbidity. Based on clinical experience, we hypothesized that implementation of a dedicated Spinal Cord Injury Service (SCIS) would impact outcomes of a patient specific population on the trauma service. The trauma center registry was retrospectively queried, from January 2011 through December 2015, for patients presenting with a spinal cord injury. In 2013, a twice weekly rounding SCIS MDT was initiated. This new multidisciplinary service, the post-SCIS, was compared to the 2011-2012 pre-SCIS. The two groups were compared across patient demographics, mechanism of injury, surgical procedures, and disposition at discharge. The primary outcome was mortality. Secondary endpoints also included the incidence of complications, hospital length of stay (HLOS), ICU LOS, ventilator free days, and all hospital-acquired infectious complications. Logistic regression and Student's t test were used to analyze data. Ninety-five patients were identified. Of these patients, 41 (43%) pre-SCIS and 54 (57%) post-SCIS patients were compared. Mean age was 46.9 years and 79% male. Overall, adjusted mortality rate between the two groups was significant with the implementation of the post-SCIS (p = 0.033). In comparison, the post-SCIS revealed shorter HLOS (23 vs 34.8 days, p = 0.004), increased ventilator free days (20.2 vs 63.3 days, p < 0.001), and less nosocomial infections (1.8 vs 22%, p = 0.002). While the post-SCIS mean ICU LOS was shorter (12 vs 17.9 days, p = 0.089), this relationship was not significant. The application of an SCIS team in addition to the trauma service suggests that a structured coordinated approach can have an expected improvement in hospital outcomes and shorter length of stays. We believe that this clinical collaboration provides distinct specialist perspectives and, therefore

  14. Leading multi-professional teams in the children’s workforce: an action research project

    Directory of Open Access Journals (Sweden)

    Karen Stuart

    2012-01-01

    Full Text Available Introduction: The 2004 Children Act in the UK saw the introduction of integrated working in children's services. A raft of change followed with processes designed to make joint working easier, and models and theories to support the development of integrated work. This paper explores the links between key concepts and practice.Methods: A practitioner action research approach is taken using an autoethnographic account kept over six months. The research question was, to what extent is this group collaborating?Results: When the architecture of practice was revealed, differences between espoused and real practice could be seen. Whilst understanding and displaying the outward signs of an effective multi professional group, the individuals did not trust one another. This was exhibited by covert interprofessional issues. As a result, collaborative inertia was achieved. This realisation prompted them to participate in further developmental and participative action research.Conclusion: The paper concludes that trust and relational agency are central to effective leadership of multi professional teams.

  15. Stroke trends in an aging population. The Technology Assessment Methods Project Team.

    Science.gov (United States)

    Niessen, L W; Barendregt, J J; Bonneux, L; Koudstaal, P J

    1993-07-01

    Trends in stroke incidence and survival determine changes in stroke morbidity and mortality. This study examines the extent of the incidence decline and survival improvement in the Netherlands from 1979 to 1989. In addition, it projects future changes in stroke morbidity during the period 1985 to 2005, when the country's population will be aging. A state-event transition model is used, which combines Dutch population projections and existing data on stroke epidemiology. Based on the clinical course of stroke, the model describes historical national age- and sex-specific hospital admission and mortality rates for stroke. It extrapolates observed trends and projects future changes in stroke morbidity rates. There is evidence of a continuing incidence decline. The most plausible rate of change is an annual decline of -1.9% (range, -1.7% to -2.1%) for men and -2.4% (range, -2.3% to -2.8%) for women. Projecting a constant mortality decline, the model shows a 35% decrease of the stroke incidence rate for a period of 20 years. Prevalence rates for major stroke will decline among the younger age groups but increase among the oldest because of increased survival in the latter. In absolute numbers this results in an 18% decrease of acute stroke episodes and an 11% increase of major stroke cases. The increase in survival cannot fully explain the observed mortality decline and, therefore, a concomitant incidence decline has to be assumed. Aging of the population partially outweighs the effect of an incidence decline on the total burden of stroke. Increase in cardiovascular survival leads to a further increase in major stroke prevalence among the oldest age groups.

  16. Academic and Institutional Review Board Collaboration to Ensure Ethical Conduct of Doctor of Nursing Practice Projects.

    Science.gov (United States)

    Foote, Jan M; Conley, Virginia; Williams, Janet K; McCarthy, Ann Marie; Countryman, Michele

    2015-07-01

    Navigating the regulations to protect human subjects and private health information for Doctor of Nursing Practice (DNP) projects can be a formidable task for students, faculty, and the institutional review board (IRB). Key stakeholders from the University of Iowa College of Nursing and the Human Subjects Office developed a standardized process for DNP students to follow, using a decision algorithm, a student orientation to the human subjects review process conducted by faculty and IRB chairs and staff, and a brief Human Subjects Research Determination form. Over 2 years, 109 students completed the process, and 96.3% of their projects were deemed not to be human subjects research. Every student submitted documentation of adherence to the standardized process. Less time was spent by students, faculty, and the IRB in preparing and processing review requests. The interprofessional collaboration resulted in a streamlined process for the timely review of DNP projects. Copyright 2015, SLACK Incorporated.

  17. One System Integrated Project Team: Retrieval And Delivery Of The Hanford Tank Wastes For Vitrification In The Waste Treatment Plant

    International Nuclear Information System (INIS)

    Harp, Benton J.; Kacich, Richard M.; Skwarek, Raymond J.

    2012-01-01

    The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank

  18. One System Integrated Project Team: Retrieval And Delivery Of The Hanford Tank Wastes For Vitrification In The Waste Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Harp, Benton J. [Department of Energy, Office of River Protection, Richland, Washington (United States); Kacich, Richard M. [Bechtel National, Inc., Richland, WA (United States); Skwarek, Raymond J. [Washington River Protection Solutions LLC, Richland, WA (United States)

    2012-12-20

    The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank

  19. One System Integrated Project Team: Retrieval and Delivery of Hanford Tank Wastes for Vitrification in the Waste Treatment Plant - 13234

    International Nuclear Information System (INIS)

    Harp, Benton J.; Kacich, Richard M.; Skwarek, Raymond J.

    2013-01-01

    The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety-conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank

  20. One System Integrated Project Team: Retrieval and Delivery of Hanford Tank Wastes for Vitrification in the Waste Treatment Plant - 13234

    Energy Technology Data Exchange (ETDEWEB)

    Harp, Benton J. [U.S. Department of Energy, Office of River Protection, Post Office Box 550, Richland, Washington 99352 (United States); Kacich, Richard M. [Bechtel National, Inc., 2435 Stevens Center Place, Richland, Washington 99354 (United States); Skwarek, Raymond J. [Washington River Protection Solutions LLC, Post Office Box 850, Richland, Washington 99352 (United States)

    2013-07-01

    The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety-conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines

  1. The community health worker cultural mentoring project: preparing professional students for team work with health workers from urban communities.

    Science.gov (United States)

    Sherwen, Laurie N; Schwolsky-Fitch, Elena; Rodriquez, Romelia; Horta, Greg; Lopez, Ivanna

    2007-01-01

    Community Health Workers or CHWs (also known by a variety of alternative titles) are health workers drawn from communities to provide access to care for members of their communities. CHWs have been documented as effective in delivering a variety of services in a culturally-sensitive manner, and in providing a bridge between health professionals and underserved or minority communities. Yet, CHWs have not been well incorporated into interdisciplinary health care teams. The majority of health professionals are not even aware of the possible role and skills of CHWs. Believing that the best time to educate professionals about this valuable health worker and ensure that CHWs become part of interdisciplinary health care teams is during the student years, the Hunter College Schools of the Health Professions, and the Community Health Worker Network of New York City developed a pilot project, the Community Health Worker Cultural Mentoring Project. Community Health Workers, who were members of the Network, served as "community mentors" for health professions students drawn from the programs of community health education, nursing, and nutrition. CHWs worked with faculty of selected courses in each of the professional programs, and served as panelists in these courses, presenting information about health beliefs and alternative health practices of diverse cultural groups in communities of New York City. Class sessions were first held in the fall of 2004; subsequent sessions were held in following semesters. Approximately 40 students participated in 7 classes, with 6 CHWs serving as mentors - two per class. At the end of the classroom presentations, students wrote reflections relating to their understanding of the CHW role and relevance for their future interdisciplinary practice. The majority of reflections met the goal of increasing professional students' understanding of the CHW role and skills. At this point, quantitative and qualitative data will need to be collected to

  2. Developing Your Dream Team

    Science.gov (United States)

    Gatlin, Kenda

    2005-01-01

    Almost anyone has held various roles on a team, be it a family unit, sports team, or a project-oriented team. As an educator, one must make a conscious decision to build and invest in a team. Gathering the best team possible will help one achieve one's goals. This article explores some of the key reasons why it is important to focus on the team…

  3. Changing the face of Abu Ghraib through mental health intervention: U.S. Army mental health team conducts debriefing with military policemen and Iraqi detainees.

    Science.gov (United States)

    Smith, Marshall H; Brady, Patrick J

    2006-12-01

    A critical incident stress debriefing (CISD) was conducted with two U.S. Army military police officers (MPs) and 11 Iraqi detainees who experienced the untimely death of a detainee. The CISD was conducted by a psychiatrist and a psychologist, who used the seven-step debriefing model created by Jeffrey Mitchell in 1983. A primary goal of CISD is to diminish the impact of a traumatic event and ultimately to prevent the onset of post-traumatic stress disorder. An unexpected finding was that the debriefing provided an opportunity for the MPs and detainees to clear preconceived notions about each other, enhancing mutual collaboration. The purpose of this article is to describe how a mental health team used a CISD as an intervention in treating MPs and detainees who experienced a common tragic event.

  4. Patterns in professional growth of science teachers involved in a team-based PD project

    DEFF Research Database (Denmark)

    Nielsen, Birgitte Lund

    and learning and subsequent discussion of this material. Repeated interviews were analyzed using an adapted version of the interconnected model of teachers’ professional growth. The results show various ways of experimenting with new approaches to be important for three of the teachers while a novice teacher...... the participants refer to. Conclusion is that there are professional growth patterns, especially a pattern involving experimenting, which have a forward-pointing potential to be used to inform school based PD. The results implicate that the same PD project can frame experimenting into practice in various tempi...... and with differentiated facilitation aligned to the individual teacher’s current needs and that external support of science resource teachers can be an integrated part of school based PD....

  5. Multivariate Analysis of Students Perception on Teaching with Client Based and Non-Client Based Team Projects

    Directory of Open Access Journals (Sweden)

    Philip Appiah-Kubi

    2018-05-01

    Full Text Available The classroom experience has evolved from traditional lecture, PowerPoint and whiteboards to a more active environment where students and instructors work together more on hands-on activities to achieve the course objectives. Various names have been given to this pedagogy; experiential learning, project-based learning, active learning, problem-based learning are a handful of names used to describe this evolving pedagogy. The main challenge faced by educators in educating undergraduate students to be independent thinkers and problem solvers, has been the driving force fueling the shift in pedagogy. The skill sets needed to be successful in the workforce has also evolved over the years. Today’s employees are not only expected to demonstrate proficiency in green skills in their field of study, but must also possess soft skills required to be competitive in the industry. Gone are the days where engineers worked in silos applying their green skills to create for the common good. To be productive, employers expect today’s engineer to demonstrate the ability to work in teams, communicate effectively, while applying the technical and analytical know-how needed to achieve a desired goal. To ensure that undergraduate students have these desired skills, most engineering educators have shifted away from the traditional all lecture classes and are applying active learning pedagogies. This research looks into student’s perception on project-based learning with client based and non-client based projects in terms of: the project as a learning device, contribution to research knowledge, motivation to learn, contribution to skills and personal benefits, and their effects on student evaluation of teaching and motivation to learn.

  6. The SKI SITE-94 Project: An International Peer Review Carried out by an OECD/NEA Team of Experts

    International Nuclear Information System (INIS)

    Sagar, Budhi; Devillers, C.; Smith, Paul; Laliuex, P.; Pescatore, C.

    1997-10-01

    The recently completed SITE-94 project is an SKI effort directed at building competence and capacity in the assessment of safety of a spent-fuel geologic repository. Emphasis is given to the assimilation of site-specific data, with its associated uncertainties, into the performance assessment. Specific attention is also given to improving the understanding of mechanisms that might compromise canister integrity. This report represents the common views of an International Review Team (IRT) established by the NEA Secretariat, at the request of SKI, to perform a peer review of SITE-94. The basis for the report is the understanding of SITE-94 and its background obtained by IRT in the course of several months of study of SITE-94 documentation, internal discussions and a meeting with SKI in Stockholm. The report is limited to the main findings of IRT. The intended audience of the report is the staff of SKI and, accordingly, the style of the report is suited to a technical audience familiar with the contents of the SITE-94 project

  7. Measuring Team Learning Behaviours through Observing Verbal Team Interaction

    Science.gov (United States)

    Raes, Elisabeth; Boon, Anne; Kyndt, Eva; Dochy, Filip

    2015-01-01

    Purpose: This study aims to explore, as an answer to the observed lack of knowledge about actual team learning behaviours, the characteristics of the actual observed basic team learning behaviours and facilitating team learning behaviours more in-depth of three project teams. Over time, team learning in an organisational context has been…

  8. Groups Meet . . . Teams Improve: Building Teams That Learn

    Science.gov (United States)

    Hillier, Janet; Dunn-Jensen, Linda M.

    2013-01-01

    Although most business students participate in team-based projects during undergraduate or graduate course work, the team experience does not always teach team skills or capture the team members' potential: Students complete the task at hand but the explicit process of becoming a team is often not learned. Drawing from organizational learning…

  9. Improving collaborative work and project management in a nuclear power plant design team: A human-centered design approach

    International Nuclear Information System (INIS)

    Boy, Guy André; Jani, Gopal; Manera, Annalisa; Memmott, Matthew; Petrovic, Bojan; Rayad, Yassine; Stephane, Lucas; Suri, Neha

    2016-01-01

    This article presents a collaborative system, called SCORE, useful for a multi-disciplinary team designing a new nuclear power plant (NPP). It was developed during the first phase of the I 2 S-LWR project (Integral Inherently Safe Light Water Reactor). SCORE enables the generation of design cards (DCs). A DC includes four main spaces (Boy, 2005): (1) a rationalization space where the various components of the system being designed (SBD) are described in terms of design rationale, integration and requirements; this space includes declarative and procedural descriptions and statements; (2) an activity space where the current version of the SBD is displayed; it includes static and dynamic features; this space enables SBD manipulation; (3) a structure space where the various components and their inter-relations are formally and declaratively described as systems of systems; (4) a function space where the various functions of the SBD are described in terms of procedural knowledge and dynamic processes involved; this space includes qualitative and quantitative physical and cognitive models. The rationalization space is informed using an adapted version of the QOC method (Questions, Options, Criteria), which was tested within the I 2 S-LWR design team. The activity space contains 3D models developed using AutoDesk Inventor, and transferred into the Unity game engine web player in order to facilitate integration within the DC spaces and enable intuitive manipulation of objects in the activity space. Two additional spaces were added: an instant messaging capability that allows design team members (DTMs) to exchange with one another on a DC; and a structured evaluation space. DCs are cooperatively created and refined by DTMs, and synthesized during periodic design meetings, the frequency of which may vary. Incrementally combining abstract explanations of designed elements and integration with their explicit visual representation improves mutual understanding among DTMs, and

  10. Structuring Effective Student Teams.

    Science.gov (United States)

    Dickson, Ellen L.

    1997-01-01

    Experience with student teams working on policy analysis projects indicates the need for faculty supervision of teams in the process of addressing complex issues. The problem-solving approach adopted in one policy analysis course is described, including assignments and tasks, issues and sponsors, team dynamics, conflict management, and the…

  11. Are High Achievers Successful in Collaborative Learning? An Explorative Study of College Students' Learning Approaches in Team Project-Based Learning

    Science.gov (United States)

    Lee, Hye-Jung; Kim, Hyekyung; Byun, Hyunjung

    2017-01-01

    This study analyses how high-achieving students approach team project-based learning (TPBL) and aims to identify the implications and challenges of TPBL practice in higher education. After interviewing 32 high-achieving students and surveying 1022 additional students at a South Korean university, we found that four factors were particularly…

  12. The European Union's four-man team of experts attending a demonstration of the DataGrid Project at CERN in early February.

    CERN Multimedia

    2003-01-01

    The DataGrid Project is reviewed by a team of European experts on a yearly basis. At the beginning of February it passed the second of these reviews with flying colours, the four experts issuing enthusiastic statements on the latest progress made, which was quite considerable in 2002.

  13. Experiences from a pilot study on how to conduct a qualitative multi-country research project regarding use of antibiotics in Southeast Europe.

    Science.gov (United States)

    Kaae, Susanne; Sporrong, Sofia Kälvemark; Traulsen, Janine Morgall; Wallach Kildemoes, Helle; Nørgaard, Lotte Stig; Jakupi, Arianit; Raka, Denis; Gürpinar, Emre Umut; Alkan, Ali; Hoxha, Iris; Malaj, Admir; Cantarero, Lourdes Arevalo

    2016-01-01

    In 2014, a qualitative multi-country research project was launched to study the reasons behind the high use of antibiotics in regions of Southeast Europe by using previously untrained national interviewers (who were engaged in other antibiotic microbial resistance-related investigations) to conduct qualitative interviews with local patients, physicians and pharmacists. Little knowledge exists about how to implement qualitative multi-country research collaborations involving previously untrained local data collectors. The aim of this paper was therefore to contribute to the knowledge regarding how to conduct these types of research projects by evaluating a pilot study of the project. Local data collectors conducted the study according to a developed protocol and evaluated the study with the responsible researcher-team from University of Copenhagen. The pilot study focused on 'local ownership', 'research quality' and 'feasibility' with regard to successful implementation and evaluation. The evaluation was achieved by interpreting 'Skype' and 'face to face' meetings and email correspondence by applying 'critical common sense'. Local data collectors achieved a sense of joint ownership. Overall, the protocol worked well. Several minor challenges pertaining to research quality and feasibility were identified, in particular obtaining narratives when conducting interviews and recruiting patients for the study. Furthermore, local data collectors found it difficult to allocate sufficient time to the project. Solutions were discussed and added to the protocol. Despite the challenges, it was possible to achieve an acceptable scientific level of research when conducting qualitative multi-country research collaboration under the given circumstances. Specific recommendations to achieve this are provided by the authors.

  14. Final Report for Project titled High Thermal Conductivity Polymer Composites for Low-Cost Heat Exchangers

    Energy Technology Data Exchange (ETDEWEB)

    Thibaud-Erkey, Catherine [United Technologies reserach Center, East Hartford, CT (United States); Alahyari, Abbas [United Technologies reserach Center, East Hartford, CT (United States)

    2016-12-28

    Heat exchangers (HXs) are critical components in a wide range of heat transfer applications, from HVAC (Heating Ventilation and Cooling) to automobiles to manufacturing plants. They require materials capable of transferring heat at high rates while also minimizing thermal expansion over the usage temperature range. Conventionally, metals are used for applications where effective and efficient heat exchange is required, since many metals exhibit thermal conductivity over 100 W/m K. While metal HXs are constantly being improved, they still have some inherent drawbacks due to their metal construction, in particular corrosion. Polymeric material can offer solution to such durability issues and allow designs that cannot be afforded by metal construction either due to complexity or cost. A major drawback of polymeric material is their low thermal conductivity (0.1-0.5? W/mK) that would lead to large system size. Recent improvements in the area of filled polymers have highlighted the possibility to greatly improve the thermal conductivity of polymeric materials while retaining their inherent manufacturing advantage, and have been applied to heat sink applications. Therefore, the objective of this project was to develop a robust review of materials for the manufacturing of industrial and commercial non-metallic heat exchangers. This review consisted of material identification, literature evaluation, as well as empirical and model characterization, resulting in a database of relevant material properties and characteristics to provide guidance for future heat exchanger development.

  15. Supporting rural remote physicians to conduct a study and write a paper: experience of Clinical Research Support Team (CRST)-Jichi.

    Science.gov (United States)

    Matsubara, S; Ohkuchi, A; Kamesaki, T; Ishikawa, S; Nakamura, Y; Matsumoto, M

    2014-01-01

    Jichi Medical University (JMU) is the only medical school in Japan that is devoted solely to producing rural and remote doctors. To support research activities of its graduates, mainly young graduates under obligatory rural service, JMU established a voluntary team, Clinical Research Support Team (CRST)-Jichi. CRST-Jichi consists of current and past JMU faculty members; all of them are specialists of certain medical fields and many are also graduates of JMU who have completed rural service. A client who asks the CRST for advice on study design or editing a paper emails the CRST to ask for support in conducting a study. Then, core members of the CRST assign the job to a registered specialist of the corresponding topic, who becomes a 'responsible supporter' and continues to support the client until a paper has been published. During the 3 years from July 2010, 12 English papers have been published in international peer-review journals, two Japanese papers in domestic journals, and 13 studies are in progress. Ninety-one percent of clients were satisfied with the service, and eighty-two percent considered their papers would not have been published if they had not used the service. Sense of commitment, existence of JMU-graduated specialists, and quick response were reported by clients as major strengths of CRST-Jichi. The experience of CRST-Jichi can potentially be transferred to not only other Japanese medical schools with rural doctor production programs, which are now rapidly increasing as part of a national policy, but also rural medical education systems in other countries.

  16. Leading teaming: Evidence from Jazz

    OpenAIRE

    Araújo, Francisco Maria Trigo da Roza Carvalho

    2013-01-01

    A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics In this research we conducted qualitative analysis to study the team dynamics of jazz combos in order to explore deeper the leadership behaviors in a creative environment where teaming occurs. We found evidence of a dual leader, one that shifts his/her role between ‘leader as leader’ and ‘leader as member’, embracing both leaderfulness an...

  17. Self-regulated learning, team learning and project performance in entrepreneurship education: Learning in a lean startup environment

    NARCIS (Netherlands)

    Harms, Rainer

    2015-01-01

    Contemporary entrepreneurship education (EE) is often based around a team-based challenge such as creating a new venture or solving a startup problem. A creative and professional solution to such a challenge requires individual and team efforts. At the level of the individual student, self-regulated

  18. Reducing Teenage Binge Drinking and Drunk Driving on the Reservation: The Pikanii Action Team

    Science.gov (United States)

    Still Smoking, Dorothy; Bull Shoe, Debbie Whitegrass

    2012-01-01

    The Pikanii Action Team project addressed the issues of teenage drinking and drunk driving on the Blackfeet Reservation. Basing their actions on locally-generated research, the Pikanii Action Team conducted a series of activities and initiatives to promote public awareness and action related to high-risk activities related to drinking. The team's…

  19. Feedback from uncertainties propagation research projects conducted in different hydraulic fields: outcomes for engineering projects and nuclear safety assessment.

    Science.gov (United States)

    Bacchi, Vito; Duluc, Claire-Marie; Bertrand, Nathalie; Bardet, Lise

    2017-04-01

    In recent years, in the context of hydraulic risk assessment, much effort has been put into the development of sophisticated numerical model systems able reproducing surface flow field. These numerical models are based on a deterministic approach and the results are presented in terms of measurable quantities (water depths, flow velocities, etc…). However, the modelling of surface flows involves numerous uncertainties associated both to the numerical structure of the model, to the knowledge of the physical parameters which force the system and to the randomness inherent to natural phenomena. As a consequence, dealing with uncertainties can be a difficult task for both modelers and decision-makers [Ioss, 2011]. In the context of nuclear safety, IRSN assesses studies conducted by operators for different reference flood situations (local rain, small or large watershed flooding, sea levels, etc…), that are defined in the guide ASN N°13 [ASN, 2013]. The guide provides some recommendations to deal with uncertainties, by proposing a specific conservative approach to cover hydraulic modelling uncertainties. Depending of the situation, the influencing parameter might be the Strickler coefficient, levee behavior, simplified topographic assumptions, etc. Obviously, identifying the most influencing parameter and giving it a penalizing value is challenging and usually questionable. In this context, IRSN conducted cooperative (Compagnie Nationale du Rhone, I-CiTy laboratory of Polytech'Nice, Atomic Energy Commission, Bureau de Recherches Géologiques et Minières) research activities since 2011 in order to investigate feasibility and benefits of Uncertainties Analysis (UA) and Global Sensitivity Analysis (GSA) when applied to hydraulic modelling. A specific methodology was tested by using the computational environment Promethee, developed by IRSN, which allows carrying out uncertainties propagation study. This methodology was applied with various numerical models and in

  20. The comparison of Missouri mathematics project and teams games tournament viewed from emotional quotient eight grade student of junior school

    Science.gov (United States)

    Setyawan, Indra; Budiyono, Slamet, Isnandar

    2017-08-01

    This research was a quasi-experimental research with 2 × 3 factorial design. It aimed to determine the learning model between Missouri Mathematics Project (MMP) and Teams Games Tournament (TGT) that gave the best achievement on mathematics subject viewed from emotional quotient. The population of this research were all of Junior High School students at the 8th grade in Surakarta City, Central Java, Indonesia in academic year 2016/2017 which applied KTSP curriculum. The sample was taken by using stratified cluster random sampling. The data were collected by using methods of documentation, emotional quotient questionnaires, and mathematics achievement test. Data analysis technique used two ways analysis of variance (ANOVA) with unequal cell. According to the research findings, it could be concluded that: (1) students' mathematics achievement which were taught by using MMP is as good as emotional quotient achievement which were taught by using TGT in straight-line equation material, (2) mathematics achievement of students with high emotional quotient is better than students with medium and low emotional quotient, and mathematics achievement of students with medium emotional quotient is as good as students with low emotional quotient in straight-line equation material, (3) in each learning model, mathematics achievement of students with high emotional quotient is better than students with medium and low emotional quotient, and mathematics achievement of students with medium emotional quotient is as good as students with low emotional quotient in straight-line equation material (4) in each category of high and medium emotional quotient, student's mathematics achievement which were taught by using MMP is better than student's mathematics achievement which were taught by using TGT and in low emotional quotient student's mathematics achievement which were taught by using MMP is as good as student's mathematics achievement which were taught by using TGT in straight

  1. Are real teams healthy teams?

    NARCIS (Netherlands)

    Buljac, M.; van Woerkom, M.; van Wijngaarden, P.

    2013-01-01

    This study examines the impact of real-team--as opposed to a team in name only--characteristics (i.e., team boundaries, stability of membership, and task interdependence) on team processes (i.e., team learning and emotional support) and team effectiveness in the long-term care sector. We employed a

  2. Evaluation of an Initiative for Fostering Provider-Pharmacist Team Management of Hypertension in Communities

    Directory of Open Access Journals (Sweden)

    William R. Doucette

    2014-01-01

    Full Text Available Objectives: 1 Conduct team building activities for provider-community pharmacist teams in small communities and 2 Determine the impact of the team approach on practitioner-reported consequences and 3 Identify obstacles to the team approach and ways to overcome them. Methods: Eleven provider-pharmacist teams were recruited in rural/micropolitan communities in Iowa. The teams participated in team building sessions facilitated by the project leaders, to discuss the team approach. Decisions included patient identification, practitioner roles, and communications. Most pharmacists conducted blood pressure (BP checks in the pharmacy and assessed the anti-hypertensive medications. If the BP was not at goal, the pharmacist worked with the patient and provider to make improvements. Teams followed their strategies for 3-5 months. Data were collected from pharmacy logs and on-line surveys of team members before and after the team period. Results: Using a multi-case approach, 4 cases were classified as Worked-Well, 5 as Limited-Success, and 2 as No-Team-Care. The Worked-Well teams provided an average of 26.5 BP visits per team, while the Limited-Success teams averaged 6.8 BP visits. The Worked-Well teams established and used a system to support the team approach. The Limited-Success teams either didn't fully establish their team system, or used it sparingly. The No-Team-Care cases did not provide any team care. Conclusions: Factors supporting success were: positive provider-pharmacist relations, established team system, commitment to team care, and patient willingness to participate. While this program had some success, potential improvements were identified: more follow-up after the team building session, additional patient materials, and guidance for practice changes.   Type: Case Study

  3. Simulation-based multiprofessional obstetric anaesthesia training conducted in situ versus off-site leads to similar individual and team outcomes

    DEFF Research Database (Denmark)

    Sørensen, Jette Led; van der Vleuten, Cees; Rosthøj, Susanne

    2015-01-01

    choice question test. EXPLORATORY OUTCOMES: Individual outcomes: scores on the Safety Attitudes Questionnaire, stress measurements (State-Trait Anxiety Inventory, cognitive appraisal and salivary cortisol), Intrinsic Motivation Inventory and perceptions of simulations. Team outcome: video assessment......OBJECTIVE: To investigate the effect of in situ simulation (ISS) versus off-site simulation (OSS) on knowledge, patient safety attitude, stress, motivation, perceptions of simulation, team performance and organisational impact. DESIGN: Investigator-initiated single-centre randomised superiority...... educational trial. SETTING: Obstetrics and anaesthesiology departments, Rigshospitalet, University of Copenhagen, Denmark. PARTICIPANTS: 100 participants in teams of 10, comprising midwives, specialised midwives, auxiliary nurses, nurse anaesthetists, operating theatre nurses, and consultant doctors...

  4. Cohesion in Online Student Teams versus Traditional Teams

    Science.gov (United States)

    Hansen, David E.

    2016-01-01

    Researchers have found that the electronic methods in use for online team communication today increase communication quality in project-based work situations. Because communication quality is known to influence group cohesion, the present research examined whether online student project teams are more cohesive than traditional teams. We tested…

  5. Simulation-based multiprofessional obstetric anaesthesia training conducted in situ versus off-site leads to similar individual and team outcomes: a randomised educational trial

    NARCIS (Netherlands)

    Sorensen, J.L.; Vleuten, C. van der; Rosthoj, S.; Ostergaard, D.; Leblanc, V.; Johansen, M.; Ekelund, K.; Starkopf, L.; Lindschou, J.; Gluud, C.; Weikop, P.; Ottesen, B.

    2015-01-01

    OBJECTIVE: To investigate the effect of in situ simulation (ISS) versus off-site simulation (OSS) on knowledge, patient safety attitude, stress, motivation, perceptions of simulation, team performance and organisational impact. DESIGN: Investigator-initiated single-centre randomised superiority

  6. Code of Conduct for wind-power projects - Phases 1 and 2

    International Nuclear Information System (INIS)

    Strub, P.; Ziegler, Ch.

    2008-08-01

    This paper discusses the results of the first two phases of a project concerning wind-power projects. The paper deals with the results of a system analysis, takes a look at lessons learned and presents an appraisal of existing instruments. A system-analysis of wind-power projects is presented with emphasis on social factors and the role of stakeholders. The success factors concerning social acceptance of wind-power projects and their special characteristics are discussed. Lessons learned are examined. Instruments for the sustainable implementation of projects are looked at, in particular with a focus on social acceptance

  7. Transforming Virtual Teams

    DEFF Research Database (Denmark)

    Bjørn, Pernille

    2005-01-01

    Investigating virtual team collaboration in industry using grounded theory this paper presents the in-dept analysis of empirical work conducted in a global organization of 100.000 employees where a global virtual team with participants from Sweden, United Kingdom, Canada, and North America were...... studied. The research question investigated is how collaboration is negotiated within virtual teams? This paper presents findings concerning how collaboration is negotiated within a virtual team and elaborate the difficulties due to invisible articulation work and managing multiple communities...... in transforming the virtual team into a community. It is argued that translucence in communication structures within the virtual team and between team and management is essential for engaging in a positive transformation process of trustworthiness supporting the team becoming a community, managing the immanent...

  8. A proposed framework for conducting pollution prevention design assessments (P2DAs) on U.S. Department of Energy design projects

    International Nuclear Information System (INIS)

    Dorsey, J.A.

    1995-03-01

    The purpose of this manual is to provide a framework for project managers, engineers, and designers to integrate pollution prevention principles and features into DOE design projects. The framework suggested is referred to as the pollution prevention design assessment (P2DA). The P2DA is based on DOE's method for conducting pollution prevention opportunity assessments (PPOAs) on existing waste-generating operations, but the P2DA is modified because the facility or process it assesses does not physically exist during design. Before the P2DA framework is introduced in the manual, recommendations for establishing the P2DA team and budget are provided. Specific pollution prevention requirements and opportunities for each design stage as delineated in DOE Order 4700.1 Project Management System are also discussed and a sample format for drafting a P2DA report is provided in the appendix. The scope of this manual includes not only the P2DA framework, but also a background discussion of pollution prevention and related topics; the regulatory requirements mandating design for pollution prevention; the benefits and barriers of designing for pollution prevention; and the impact that pollution prevention and related environmental avoidance concepts have had on the engineering profession

  9. Making Teamwork Work: Team Knowledge for Team Effectiveness.

    Science.gov (United States)

    Guchait, Priyanko; Lei, Puiwa; Tews, Michael J

    2016-01-01

    This study examined the impact of two types of team knowledge on team effectiveness. The study assessed the impact of taskwork knowledge and teamwork knowledge on team satisfaction and performance. A longitudinal study was conducted with 27 service-management teams involving 178 students in a real-life restaurant setting. Teamwork knowledge was found to impact both team outcomes. Furthermore, team learning behavior was found to mediate the relationships between teamwork knowledge and team outcomes. Educators and managers should therefore ensure these types of knowledge are developed in teams along with learning behavior for maximum effectiveness.

  10. Beautiful Teams Inspiring and Cautionary Tales from Veteran Team Leaders

    CERN Document Server

    Stellman, Andrew

    2009-01-01

    What's it like to work on a great software development team facing an impossible problem? How do you build an effective team? Beautiful Teams takes you behind the scenes with some of the most interesting teams in software engineering history. You'll learn from veteran team leaders' successes and failures, told through a series of engaging personal stories -- and interviews -- by leading programmers, architects, project managers, and thought leaders.

  11. Research on the Earth's Interior Conducted by Russia after IGY: The Geotraverse Project and "Intermargins"

    Directory of Open Access Journals (Sweden)

    A G Rodnikov

    2009-04-01

    Full Text Available Fifty years have passed since the International Geophysical Year (IGY of 1957.58, one of the most important and noble initiatives in the history of science and in the history of humanity in general. IGY became the model for subsequent international scientific initiatives in various fields of solid Earth research, including the Upper Mantle Project (1961.71, the Geodynamic Project (1971.80, the Geotraverse Project (1987.2003, and the "InterMARGINS" Project (2003. The Russian investigations as part of the Geotraverse Project and "InterMARGINS" were aimed at research into the deep structure of the continental margins of East Eurasia, which are characterized by high seismicity, volcanism, and natural cataclysms hazardous to people living there.

  12. Overview of some biomedical research projects in tropical medicine conducted at the Instituto Venezolano de Investigaciones Cientificas

    Directory of Open Access Journals (Sweden)

    Romano Egidio

    2000-01-01

    Full Text Available The Instituto Venezolano de Investigaciones Cientificas (IVIC is a government-funded multidisciplinary academic institution dedicated to research, development and technology in many areas of knowledge. Biomedical projects and publications comprise about 40% of the total at IVIC. In this article, we present an overview of some selected research and development projects conducted at IVIC which we believe contain new and important aspects related to malaria, ancylostomiasis, dengue fever, leishmaniasis and tuberculosis. Other projects considered of interest in the general area of tropical medicine are briefly described. This article was prepared as a small contribution to honor and commemorate the centenary of the Instituto Oswaldo Cruz.

  13. Overview of some biomedical research projects in tropical medicine conducted at the Instituto Venezolano de Investigaciones Cientificas.

    Science.gov (United States)

    Romano, E; Cesari, I; Escalante, A; Liprandi, F; O'Daly, J A; Perez, H; Takiff, H

    2000-01-01

    The Instituto Venezolano de Investigaciones Cientificas (IVIC) is a government-funded multidisciplinary academic institution dedicated to research, development and technology in many areas of knowledge. Biomedical projects and publications comprise about 40% of the total at IVIC. In this article, we present an overview of some selected research and development projects conducted at IVIC which we believe contain new and important aspects related to malaria, ancylostomiasis, dengue fever, leishmaniasis and tuberculosis. Other projects considered of interest in the general area of tropical medicine are briefly described. This article was prepared as a small contribution to honor and commemorate the centenary of the Instituto Oswaldo Cruz.

  14. Wahlfach Teamarbeit: Ergebnisse eines Pilotprojektes zur interprofessionellen und interdisziplinären Ausbildung mit formativem Team-OSCE (TOSCE [Teamwork elective: Results of a German pilot project on interprofessional and interdisciplinary education with formative team OSCE

    Directory of Open Access Journals (Sweden)

    Schmidt, Anita

    2010-08-01

    Full Text Available [english] Aims: There is a growing need to implement teamworking in medical education. In reality, interdisciplinary and interprofessional education is often absent. Here we describe a pilot trial developed jointly by the nursing college and the medical faculty in Erlangen (Germany in which nursing students and undergraduate medical students formed interprofessional teams and were confronted with interprofessional cases using simulated patients (SPs and phantoms. The elective was planned using standard curriculum planning instruments and finally evaluated with a novel formative team OSCE (Objective Structured Clinical Evaluation instrument.Methods: During one year, 20 nursing students participated voluntarily in the project and 10 medical students took the course as an elective. Results: The pilot project was first performed with two tutors, one from the medical school and one from the nursing school, as well as one to two SPs. During the second course, there was only one tutor. Overall evaluation of the voluntary students was good, with some elements (acute stroke, factual knowledge, and general organizational problems that needed to be improved. Performance of a four-station team OSCE was feasible, but raters reported problems in assessing individuals and the team at the same time. Interobserver agreement was satisfactory (kappa 0.35.Conclusions: Interdisciplinary and interprofessional education between a nursing school and a medical school is feasible within an elective, but requires substantial personnel resources. Design and performance of a team OSCE is possible. The validity of the test has to be shown on follow-up.[german] Zielsetzung: Das Lernziel „Fähigkeit zur interprofessionellen und interdisziplinären Teamarbeit“ wird sowohl in der aktuellen Approbationsordnung für Ärzte als auch im Krankenpflegegesetz gefordert. In der Realität gibt es in beiden Ausbildungen kaum gemeinsame Lehreinheiten. Wir beschreiben ein Pilotprojekt

  15. Management Teams

    CERN Document Server

    Belbin, R Meredith Meredith

    2012-01-01

    Meredith Belbin's work on teams has become part of everyday language in organizations all over the world. All kinds of teams and team behaviours are covered. At the end of the book is a self-perception inventory so that readers can match their own personalities to particular team roles. Management Teams is required reading for managers concerned with achieving results by getting the best from their key personnel.

  16. Lessons learned from training peer-leaders to conduct Body Project workshops.

    Science.gov (United States)

    Vanderkruik, Rachel; Strife, Samantha; Dimidjian, Sona

    2017-01-01

    The Body Project is a cognitive-dissonance intervention that is effective in improving body satisfaction for high school and college aged women. The Body Project can be implemented by trained peers, thus increasing its potential for broad and cost-effective dissemination. Little is known, however, about peer-leaders' perceptions of their training needs and preferences to deliver prevention programs. This qualitative study explored the perceptions of training strengths and areas of improvement among 14 Body Project peer-leaders at a college campus through a series of focus groups. Recommendations are made to inform training for the Body Project as well as peer-led prevention and treatment interventions more broadly.

  17. Research from Afar: Considerations for Conducting an Off-Site Research Project.

    Science.gov (United States)

    Williams, Reg Arthur; Hagerty, Bonnie M.; Hoyle, Kenneth; Yousha, Steven M.; Abdoo, Yvonne; Andersen, Curt; Engler, Dorothy

    1999-01-01

    Critical elements in the success of off-site research projects include the following: negotiation, attention to personnel issues, communication, participation of research subjects, data management, and concern for privacy issues. (SK)

  18. Characteristics of team briefings in gynecological surgery.

    Science.gov (United States)

    Forsyth, Katherine L; Hildebrand, Emily A; Hallbeck, M Susan; Branaghan, Russell J; Blocker, Renaldo C

    2018-02-24

    Preoperative briefings have been proven beneficial for improving team performance in the operating room. However, there has been minimal research regarding team briefings in specific surgical domains. As part of a larger project to develop a briefing structure for gynecological surgery, the study aimed to better understand the current state of pre-operative team briefings in one department of an academic hospital. Twenty-four team briefings were observed and video recorded. Communication was analyzed and social network metrics were created based on the team member verbal interactions. Introductions occurred in only 25% of the briefings. Network analysis revealed that average team briefings exhibited a hierarchical structure of communication, with the surgeon speaking the most frequently. The average network for resident-led briefings displayed a non-hierarchical structure with all team members communicating with the resident. Briefings conducted without a standardized protocol can produce variable communication between the role leading and the team members present. Copyright © 2018 Elsevier Ltd. All rights reserved.

  19. Team Leadership: Leadership Role Achievement in Supervision Teams in Turkey

    OpenAIRE

    Ali Sabanci; Izzet Ozdemir

    2015-01-01

    The purpose of this paper is to explore the views of team leaders and team members of supervision teams about the extent that team leaders achieve their team leadership roles in Turkey. This research was conducted as a survey. The population of the study consisted of approximately 2650 supervisors (inspectors) working in 81 provinces distributed to seven geographical regions in Turkey. The sample consisted of 563 supervisors which were selected out by random sampling. The data were gathered b...

  20. Team Learning Ditinjau dari Team Diversity dan Team Efficacy

    OpenAIRE

    Pohan, Vivi Gusrini Rahmadani; Ancok, Djamaludin

    2010-01-01

    This research attempted to observe team learning from the level of team diversity and team efficacy of work teams. This research used an individual level of analysis rather than the group level. The team members measured the level of team diversity, team efficacy and team learning of the teams through three scales, namely team learning scale, team diversity scale, and team efficacy scale. Respondents in this research were the active team members in a company, PT. Alkindo Mitraraya. The total ...

  1. Team Learning Ditinjau dari Team Diversity dan Team Efficacy

    OpenAIRE

    Vivi Gusrini Rahmadani Pohan; Djamaludin Ancok

    2015-01-01

    This research attempted to observe team learning from the level of team diversity and team efficacy of work teams. This research used an individual level of analysis rather than the group level. The team members measured the level of team diversity, team efficacy and team learning of the teams through three scales, namely team learning scale, team diversity scale, and team efficacy scale. Respondents in this research were the active team members in a company, PT. Alkindo Mitraraya. The total ...

  2. 30 CFR 285.710 - When conducting onsite installation inspections, what must the CVA or project engineer do?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false When conducting onsite installation inspections, what must the CVA or project engineer do? 285.710 Section 285.710 Mineral Resources MINERALS MANAGEMENT...: (1) Loadout and initial flotation procedures; (2) Towing operation procedures to the specified...

  3. Microbial Murders Crime Scene Investigation: An Active Team-Based Learning Project that Enhances Student Enthusiasm and Comprehension of Clinical Microbial Pathogens.

    Science.gov (United States)

    Steel, J Jordan

    2017-01-01

    Microbial disease knowledge is a critical component of microbiology courses and is beneficial for many students' future careers. Microbiology courses traditionally cover core concepts through lectures and labs, but specific instruction on microbial diseases varies greatly depending on the instructor and course. A common project involves students researching and presenting a disease to the class. This method alone is not very effective, and course evaluations have consistently indicated that students felt they lacked adequate disease knowledge; therefore, a more hands-on and interactive disease project was developed called Microbial Murders. For this team-based project, a group of students chooses a pathogen, researches the disease, creates a "mugshot" of the pathogen, and develops a corresponding "crime scene," where a hypothetical patient has died from the microbe. Each group gives a presentation introducing the microbial pathogen, signs/symptoms, treatments, and overall characteristics. The students then visit each other's crime scenes to match the pathogen with the correct crime scene by critically thinking through the clues. This project has shown remarkable success. Surveys indicate that 73% of students thought the project helped them understand the material and 84% said it was worth their time. Student participation, excitement, understanding, and application of microbial disease knowledge have increased and are evident through an increase in course evaluations and in student assessment scores. This project is easy to implement and can be used in a wide variety of biology, microbiology, or health classes for any level (middle school through college).

  4. Development of an Integrated Team Training Design and Assessment Architecture to Support Adaptability in Healthcare Teams

    Science.gov (United States)

    2017-10-01

    provision of training is not a major focus of this project, trainees were able to practice trauma management skills as well as leadership skills...SUBJECT TERMS Military healthcare team; Trauma teams; Team training; Teamwork; Adaptive performance; Leadership ; Simulation; Modeling; Bayesian belief...ABBREVIATIONS Healthcare team Trauma Trauma teams Team training Teamwork Adaptability Adaptive performance Leadership Simulation Modeling

  5. Team-client Relationships And Extreme Programming

    Directory of Open Access Journals (Sweden)

    John Karn

    2008-01-01

    Full Text Available This paper describes a study that examined the relationship between software engineering teams who adhered to the extreme programming (XP methodology and their project clients. The study involved observing teams working on projects for clients who had commissioned a piece of software to be used in the real world. Interviews were conducted during and at the end of the project to get client opinion on how the project had progressed. Of interest to the researchers were opinions on frequency of feedback, how the team captured requirements, whether or not the iterative approach of XP proved to be helpful, and the level of contextual and software engineering knowledge the client had at the start of the project. In theory, fidelity to XP should result in enhanced communication, reduce expectation gaps, and lead to greater client satisfaction. Our results suggest that this depends heavily on the communication skills of the team and of the client, the expectations of the client, and the nature of the project.

  6. Primary teachers conducting inquiry projects : the effect on attitude towards science and inquiry

    NARCIS (Netherlands)

    van Aalderen-Smeets, Sandra; Walma van der Molen, Julie Henriëtte

    2015-01-01

    This paper presents the results of a theoretically informed professionalisation project that was set up to improve primary teachers’ attitudes towards science and attitude towards inquiry. A positive attitude towards science is of fundamental importance for teachers when stimulating interest in

  7. A Laboratory Experiment, Based on the Maillard Reaction, Conducted as a Project in Introductory Statistics

    Science.gov (United States)

    Kravchuk, Olena; Elliott, Antony; Bhandari, Bhesh

    2005-01-01

    A simple laboratory experiment, based on the Maillard reaction, served as a project in Introductory Statistics for undergraduates in Food Science and Technology. By using the principles of randomization and replication and reflecting on the sources of variation in the experimental data, students reinforced the statistical concepts and techniques…

  8. Team Sports

    Science.gov (United States)

    ... Games. USA Hockey offers additional information and resources. Softball It's not easy to field full teams of ... an annual tournament sponsored by the National Wheelchair Softball Association , where thirty or so teams show up ...

  9. The NPD team conflict

    DEFF Research Database (Denmark)

    Ma, Zheng; Lin, Chih-Cheng; Tanev, Stoyan

    2012-01-01

    elaborates on the role of culture diversity and geographical dispersion in NPD team conflict. A simulation is conducted where organizations may be regarded as complex systems to affect the team conflict with a variety of influences. The results firstly indicate that there are two dimensions of NPD team...... conflict: stable and unstable dimensions with four elements: task characteristics, group members’ relationship, cultural diversity and geographical dispersion; secondly, there are two phenomena whereby the geographical dispersion influences the NPD team interaction, and the influence between cultural...

  10. Submarine Medicine Team

    Data.gov (United States)

    Federal Laboratory Consortium — The Submarine Medicine Team conducts basic and applied research on biomedical aspects of submarine and diving environments. It focuses on ways to optimize the health...

  11. Family physician-led, team-based, lifestyle intervention in patients with metabolic syndrome: results of a multicentre feasibility project.

    Science.gov (United States)

    Jeejeebhoy, Khursheed; Dhaliwal, Rupinder; Heyland, Daren K; Leung, Roger; Day, Andrew G; Brauer, Paula; Royall, Dawna; Tremblay, Angelo; Mutch, David M; Pliamm, Lew; Rhéaume, Caroline; Klein, Doug

    2017-01-01

    Metabolic syndrome (MetS) is a medical condition with major complications and health care costs. Previous research has shown that diet and exercise can improve and reverse this condition. The goal of this study was to test the feasibility and effectiveness of implementing the Canadian Health Advanced by Nutrition and Graded Exercise (CHANGE) program into diverse family medicine practices to improve MetS. In this longitudinal before-after study, 305 adult patients with MetS were recruited from 3 diverse family medicine team-based organizations to the CHANGE personalized diet and exercise program. Participants were followed for 12 months. Primary outcomes included feasibility and reversal of MetS. Secondary outcomes included improvement in MetS components, changes in diet quality, aerobic fitness and cardiovascular risk. Participants attended 76% and 90% of the kinesiologist and dietitian visits, respectively. At 12 months, 19% of patients (95% confidence interval [CI] 14%-24%) showed reversal of MetS, VO2max increased by 16% (95% CI 13%-18%), and Healthy Eating Index and Mediterranean Diet Scores improved by 9.6% (95% CI 7.6%-11.6%) and 1.4% (1.1%-1.6%), respectively. In addition, the Prospective Cardiovascular Munster (PROCAM) 10-year risk of acute coronary event decreased by 1.4%, from a baseline of 8.6%. A team-based program led by the family physician that educates patients about the risks of MetS, and with a dietitian and kinesiologist, empowers them to undertake an individualized supervised program of diet modification and exercise, is feasible, improves aerobic capacity and diet quality, reverses MetS and improves MetS components at 12 months.

  12. Primary health care teams put to the test a cross-sectional study from Austria within the QUALICOPC project.

    Science.gov (United States)

    Hoffmann, Kathryn; George, Aaron; Dorner, Thomas E; Süß, Katharina; Schäfer, Willemijn L A; Maier, Manfred

    2015-11-16

    Multidisciplinary Primary Health Care Teams (PHCT) provide a comprehensive approach to address the social and health needs of communities. It was the aim of this analysis to assess the number of PHCT in Austria, a country with a weak PHC system, and to compare preventive activities, psychosocial care, and work satisfaction between GPs who work and those who do not work in PHCT. Within the QUALICOPC study, data collection was performed between November 2011 and May 2012, utilizing a standardized questionnaire for GPs. A stratified sample of GPs from across Austria was invited. Statistical analyses included descriptive statistics and tests. Data from 171 GPs questionnaires were used for this analysis. Of these, 61.1 % (n = 113) had a mono-disciplinary office, 26.3 % (n = 45) worked in an office consisting of GP, receptionist and one additional primary care profession, and 7.6 % (n = 13) worked in a larger PHCT. GPs that worked in larger PHCT were younger and more involved in psychosocial and preventive care. No differences were found with regard to work satisfaction or workload. This study gives insight into the structures of PHC in Austria. The results indicate a low number of PHCT; however, the overall return rate in our sample was low with more male GPs, more GPs from urban areas and more GPs working in offices together with other physicians than the national average. Younger GPs demonstrate a greater tendency to implement this primary care practice model in their practices, which seems to be associated with an emphasis in psychosocial and preventive care. If Austria is to increase the number of PHC teams, the country should embrace the work of young GPs and should offer relevant support for PHCT. Future developments could be guided by considering effective models of good practice and governmental support as in other countries.

  13. Reducing Nutrients and Nutrient Impacts Priority Issue Team - St. Louis Bay Project: Implementing Nutrients PIT Action Step 1.1

    Science.gov (United States)

    Mason, Ted

    2011-01-01

    The NASA Applied Science & Technology Project Office at Stennis Space Center(SSC) used satellites, in-situ measurements and computational modeling to study relationships between water quality in St. Louis Bay, Mississippi and the watershed characteristics of the Jourdan and Wolf rivers from 2000-2010.

  14. Handbook for Planning and Conducting Charrettes for High-Performance Projects

    Energy Technology Data Exchange (ETDEWEB)

    Lindsey, G.; Todd, J. A.; Hayter, S. J.

    2003-08-01

    The purpose of this handbook is to furnish guidance for planning and conducting a"high-performance building" charrette, sometimes called a"greening charrette." The handbook answers typical questions that will arise, such as"What is a charrette?""Why conduct a charrette?""What topics should we cover during the charrette?" and"Whom should we invite?" It also contains samples of agendas, invitation letters, and other commonly used charrette materials. This handbook also outlines the characteristics of a good charrette facilitator. It gives suggestions for the types of experts to invite to the event to motivate participants and answer their questions. The handbook includes sample presentations that can be used by these experts to ensure they address the required technical content. It suggests the types of participants, including technical, political, and community representatives, to invite to the charrette. It offers advice for forming effective breakout groups to ensure that a broad range of complementary expertise is represented in each group. We have also included guidance on how best to include key decision makers and stakeholders who are able to attend only portions of the event.

  15. Research team training: moving beyond job descriptions.

    Science.gov (United States)

    Nelson, LaRon E; Morrison-Beedy, Dianne

    2008-08-01

    Providing appropriate training to research team members is essential to the effective implementation and overall operation of a research project. It is important to identify job requirements beyond those listed in the job description in order to fully assess basic and supplementary training needs. Training needs should be identified prior to and during the conduct of the study. Methods for delivering the training must also be identified. This article describes the identification of training needs and methods in the design of a research team training program using examples from an HIV prevention intervention trial with adolescent girls.

  16. Managing multicultural teams.

    Science.gov (United States)

    Brett, Jeanne; Behfar, Kristin; Kern, Mary C

    2006-11-01

    Multicultural teams offer a number of advantages to international firms, including deep knowledge of different product markets, culturally sensitive customer service, and 24-hour work rotations. But those advantages may be outweighed by problems stemming from cultural differences, which can seriously impair the effectiveness of a team or even bring itto a stalemate. How can managers best cope with culture-based challenges? The authors conducted in-depth interviews with managers and members of multicultural teams from all over the world. Drawing on their extensive research on dispute resolution and teamwork and those interviews, they identify four problem categories that can create barriers to a team's success: direct versus indirect communication, trouble with accents and fluency, differing attitudes toward hierarchy and authority, and conflicting norms for decision making. If a manager--or a team member--can pinpoint the root cause of the problem, he or she is likelier to select an appropriate strategy for solving it. The most successful teams and managers, the authors found, dealt with multicultural challenges in one of four ways: adaptation (acknowledging cultural gaps openly and working around them), structural intervention (changing the shape or makeup of the team), managerial intervention (setting norms early or bringing in a higher-level manager), and exit (removing a team member when other options have failed). Which strategy is best depends on the particular circumstances--and each has potential complications. In general, though, managers who intervene early and set norms; teams and managers who try to engage everyone on the team; and teams that can see challenges as stemming from culture, not personality, succeed in solving culture-based problems with good humor and creativity. They are the likeliest to harvest the benefits inherent in multicultural teams.

  17. Supporting Distributed Team Working in 3D Virtual Worlds: A Case Study in Second Life

    Science.gov (United States)

    Minocha, Shailey; Morse, David R.

    2010-01-01

    Purpose: The purpose of this paper is to report on a study into how a three-dimensional (3D) virtual world (Second Life) can facilitate socialisation and team working among students working on a team project at a distance. This models the situation in many commercial sectors where work is increasingly being conducted across time zones and between…

  18. Code of Conduct for wind-power projects - Phases 1 and 2; Code of Conduct fuer windkraftprojekte. Phase 1 und 2 - Systemanalyse, Lessons Learned und Bewertung bestehender Instrumente

    Energy Technology Data Exchange (ETDEWEB)

    Strub, P. [Pierre Strub, freischaffender Berater, Binningen (Switzerland); Ziegler, Ch. [Inter Act, Basel (Switzerland)

    2008-08-15

    This paper discusses the results of the first two phases of a project concerning wind-power projects. The paper deals with the results of a system analysis, takes a look at lessons learned and presents an appraisal of existing instruments. A system-analysis of wind-power projects is presented with emphasis on social factors and the role of stakeholders. The success factors concerning social acceptance of wind-power projects and their special characteristics are discussed. Lessons learned are examined. Instruments for the sustainable implementation of projects are looked at, in particular with a focus on social acceptance

  19. Beryllium Project: developing in CDTN of uranium dioxide fuel pellets with addition of beryllium oxide to increase the thermal conductivity

    International Nuclear Information System (INIS)

    Ferreira, Ricardo Alberto Neto; Camarano, Denise das Merces; Miranda, Odair; Grossi, Pablo Andrade; Andrade, Antonio Santos; Queiroz, Carolinne Mol; Gonzaga, Mariana de Carvalho Leal

    2013-01-01

    Although the nuclear fuel currently based on pellets of uranium dioxide be very safe and stable, the biggest problem is that this material is not a good conductor of heat. This results in an elevated temperature gradient between the center and its lateral surface, which leads to a premature degradation of the fuel, which restricts the performance of the reactor, being necessary to change the fuel before its full utilization. An increase of only 5 to 10 percent in its thermal conductivity, would be a significant increase. An increase of 50 percent would be a great improvement. A project entitled 'Beryllium Project' was developed in CDTN - Centro de Desenvolvimento da Tecnologia Nuclear, which aimed to develop fuel pellets made from a mixture of uranium dioxide microspheres and beryllium oxide powder to obtain a better heat conductor phase, filling the voids between the microspheres to increase the thermal conductivity of the pellet. Increases in the thermal conductivity in the range of 8.6% to 125%, depending on the level of addition employed in the range of 1% to 14% by weight of beryllium oxide, were obtained. This type of fuel promises to be safer than current fuels, improving the performance of the reactor, in addition to last longer, resulting in great savings. (author)

  20. When Teams Go Crazy

    DEFF Research Database (Denmark)

    Kuhrmann, Marco; Münch, Jürgen

    2016-01-01

    Software development consists to a large extend of human-based processes with continuously increasing demands regarding interdisciplinary team work. Understanding the dynamics of software teams can be seen as highly important to successful project execution. Hence, for future project managers......, knowledge about non-technical processes in teams is significant. In this paper, we present a course unit that provides an environment in which students can learn and experience the impact of group dynamics on project performance and quality. The course unit uses the Tuckman model as theoretical framework......, and borrows from controlled experiments to organize and implement its practical parts in which students then experience the effects of, e.g., time pressure, resource bottlenecks, staff turnover, loss of key personnel, and other stress factors. We provide a detailed design of the course unit to allow...

  1. In situ testing to determination field-saturated hydraulic conductivity of UMTRA Project disposal cell covers, liners, and foundation areas

    International Nuclear Information System (INIS)

    1994-02-01

    This special study was conducted to prepare a guidance document for selecting in situ hydraulic conductivity (K) tests, comparing in situ testing methods, and evaluating the results of such tests. This report may be used as a practical decision-making tool by the Uranium Mill Tailings Remedial Action (UMTRA) Project staff to determine which testing method will most efficiently achieve the field-saturated K results needed for long-term planning. A detailed section on near-surface test methods discusses each method which may be applicable to characterization of UMTRA disposal cell covers, liners and foundation materials. These potentially applicable test methods include the sealed double-ring infiltrometer (SDRI), the air-entry permeameter (AEP), the guelph permeameter, the two-stage borehole technique (TSB), the pressure infiltrometer, and the disk permeameter. Analytical solutions for these methods are provided, and limitations of these solutions are discussed, and a description of testing equipment design and installation are provided

  2. Performance of student software development teams: the influence of personality and identifying as team members

    Science.gov (United States)

    Monaghan, Conal; Bizumic, Boris; Reynolds, Katherine; Smithson, Michael; Johns-Boast, Lynette; van Rooy, Dirk

    2015-01-01

    One prominent approach in the exploration of the variations in project team performance has been to study two components of the aggregate personalities of the team members: conscientiousness and agreeableness. A second line of research, known as self-categorisation theory, argues that identifying as team members and the team's performance norms should substantially influence the team's performance. This paper explores the influence of both these perspectives in university software engineering project teams. Eighty students worked to complete a piece of software in small project teams during 2007 or 2008. To reduce limitations in statistical analysis, Monte Carlo simulation techniques were employed to extrapolate from the results of the original sample to a larger simulated sample (2043 cases, within 319 teams). The results emphasise the importance of taking into account personality (particularly conscientiousness), and both team identification and the team's norm of performance, in order to cultivate higher levels of performance in student software engineering project teams.

  3. Comparison of CFD Natural Convection and Conduction-only Models for Heat Transfer in the Yucca Mountain Project Drifts

    International Nuclear Information System (INIS)

    Hadgu, T.; Webb, S.; Itamura, M.

    2004-01-01

    Yucca Mountain, Nevada has been designated as the nation's high-level radioactive waste repository and the U.S. Department of Energy has been approved to apply to the U.S. Nuclear Regulatory Commission for a license to construct a repository. Heat transfer in the Yucca Mountain Project (YMP) drift enclosures is an important aspect of repository waste emplacement. Canisters containing radioactive waste are to be emplaced in tunnels drilled 500 m below the ground surface. After repository closure, decaying heat is transferred from waste packages to the host rock by a combination of thermal radiation, natural convection and conduction heat transfer mechanism?. Current YMP mountain-scale and drift-scale numerical models often use a simplified porous medium code to model fluid and heat flow in the drift openings. To account for natural convection heat transfer, the thermal conductivity of the air was increased in the porous medium model. The equivalent thermal conductivity, defined as the ratio of total heat flow to conductive heat flow, used in the porous media models was based on horizontal concentric cylinders. Such modeling does not effectively capture turbulent natural convection in the open spaces as discussed by Webb et al. (2003) yet the approach is still widely used on the YMP project. In order to mechanistically model natural convection conditions in YMP drifts, the computational fluid dynamics (CFD) code FLUENT (Fluent, Incorporated, 2001) has been used to model natural convection heat transfer in the YMP emplacement drifts. A two-dimensional (2D) model representative of YMP geometry (e.g., includes waste package, drip shield, invert and drift wall) has been developed and numerical simulations made (Francis et al., 2003). Using CFD simulation results for both natural convection and conduction-only heat transfer in a single phase, single component fluid, equivalent thermal conductivities have been calculated for different Rayleigh numbers. Correlation

  4. The importance of trust in virtual team knowledge mediation

    DEFF Research Database (Denmark)

    Petersen, Nils Braad

    2012-01-01

    For transnational companies, virtual project teams are a means of overcoming temporal, geographical and organizational boundaries between team members. However, because the level of knowledge communication has been shown to be influenced by trust (e.g. Staples & Webster 2008; Quigley, Tesluk, Locke......, and will examine how the corporate context, consisting of embedded cultures, corporate structures and orgamizational communities of practice (CoP) support relationships, identity, trust and knowledge communication. According to the literature review on virtual teams conducted by Martins, Gilson & Maynard (2004...

  5. Multicultural Ground Teams in Space Programs

    Science.gov (United States)

    Maier, M.

    2012-01-01

    In the early years of space flight only two countries had access to space. In the last twenty years, there have been major changes in how we conduct space business. With the fall of the iron curtain and the growing of the European Union, more and more players were able to join the space business and space science. By end of the last century, numerous countries, agencies and companies earned the right to be equal partners in space projects. This paper investigates the impact of multicultural teams in the space arena. Fortunately, in manned spaceflight, especially for long duration missions, there are several studies and simulations reporting on multicultural team impact. These data have not been as well explored on the team interactions within the ground crews. The focus of this paper are the teams working on the ISS project. Hypotheses will be drawn from the results of space crew research to determine parallels and differences for this vital segment of success in space missions. The key source of the data will be drawn from structured interviews with managers and other ground crews on the ISS project.

  6. Virtual Teams.

    Science.gov (United States)

    Geber, Beverly

    1995-01-01

    Virtual work teams scattered around the globe are becoming a feature of corporate workplaces. Although most people prefer face-to-face meetings and interactions, reality often requires telecommuting. (JOW)

  7. Team Organization Method Using Salary Auction Game for Sustainable Motivation

    Directory of Open Access Journals (Sweden)

    Sangkyun Kim

    2015-10-01

    Full Text Available In performing team-based projects in engineering class, students usually face many problems, such as free-riding, lack of responsibility, boredom, and insufficient initiative. This papers proposes a new method for performing team-based projects in engineering class—specifically, a gamified method for team organization using a salary auction game. On the description of the design and use of a salary auction game in engineering class, a case study conducted using a survey method is reported to validate the practical value of the proposed auction game. The salary auction game proposed in this paper demonstrates that a gamified team organization method in engineering class could be used as an effective tool to enhance motivation and to improve learning outcomes of engineering students.

  8. Nuclear Nonproliferation Ontology Assessment Team Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Strasburg, Jana D.; Hohimer, Ryan E.

    2012-01-01

    Final Report for the NA22 Simulations, Algorithm and Modeling (SAM) Ontology Assessment Team's efforts from FY09-FY11. The Ontology Assessment Team began in May 2009 and concluded in September 2011. During this two-year time frame, the Ontology Assessment team had two objectives: (1) Assessing the utility of knowledge representation and semantic technologies for addressing nuclear nonproliferation challenges; and (2) Developing ontological support tools that would provide a framework for integrating across the Simulation, Algorithm and Modeling (SAM) program. The SAM Program was going through a large assessment and strategic planning effort during this time and as a result, the relative importance of these two objectives changed, altering the focus of the Ontology Assessment Team. In the end, the team conducted an assessment of the state of art, created an annotated bibliography, and developed a series of ontological support tools, demonstrations and presentations. A total of more than 35 individuals from 12 different research institutions participated in the Ontology Assessment Team. These included subject matter experts in several nuclear nonproliferation-related domains as well as experts in semantic technologies. Despite the diverse backgrounds and perspectives, the Ontology Assessment team functioned very well together and aspects could serve as a model for future inter-laboratory collaborations and working groups. While the team encountered several challenges and learned many lessons along the way, the Ontology Assessment effort was ultimately a success that led to several multi-lab research projects and opened up a new area of scientific exploration within the Office of Nuclear Nonproliferation and Verification.

  9. AA magnet measurement team

    CERN Multimedia

    CERN PhotoLab

    1978-01-01

    Quickly improvised measurement equipment for the AA (Antiproton Accumulator) was all the tight schedule permitted, but the high motivation of the team made up for the lack of convenience. From left to right: Roy Billinge (Joint AA Project Leader, the other one was Simon van der Meer); Bruno Autin, Brian Pincott, Colin Johnson.

  10. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  11. Evaluation of the radionuclide tracer test conducted at the project Gnome Underground Nuclear Test Site, New Mexico

    International Nuclear Information System (INIS)

    Pohll, G.; Pohlmann, K.

    1996-08-01

    A radionuclide tracer test was conducted in 1963 by the U.S. Geological Survey at the Project Gnome underground nuclear test site, approximately 40 km southeast of Carlsbad, New Mexico. The tracer study was carried out under the auspices of the U.S. Atomic Energy Commission (AEC) to study the transport behavior of radionuclides in fractured rock aquifers. The Culebra Dolomite was chosen for the test because it was considered to be a reasonable analogue of the fractured carbonate aquifer at the Nevada Test Site (NTS), the principal location of U.S. underground nuclear tests. Project Gnome was one of a small number of underground nuclear tests conducted by the AEC at sites distant from the NTS. The Gnome device was detonated on December 10, 1961 in an evaporate unit at a depth of 360 m below ground surface. Recently, the U.S. Department of Energy (DOE) implemented an environmental restoration program to characterize, remediate, and close these offsite nuclear test areas. An early step in this process is performance of a preliminary risk analysis of the hazard posed by each site. The Desert Research Institute has performed preliminary hydrologic risk evaluations for the groundwater transport pathway at Gnome. That evaluation included the radioactive tracer test as a possible source because the test introduced radionuclides directly into the Culebra Dolomite, which is the only aquifer at the site. This report presents a preliminary evaluation of the radionuclide tracer test as a source for radionuclide migration in the Culebra Dolomite. The results of this study will assist in planning site characterization activities and refining estimates of the radionuclide source for comprehensive models of groundwater transport st the Gnome site

  12. Virtual Teams and E-Collaboration Technology: A Case Study Investigating the Dynamics of Virtual Team Communication

    Science.gov (United States)

    Mattison, Theresa

    2011-01-01

    The purpose of this study was to determine to what extent the use of e-collaboration tools when used as a primary channel of communication affected virtual team members' trust and motivation, in a spatially dispersed environment. Structured interviews were conducted with 18 project managers, who were responsible for leading virtual projects…

  13. Experience as Knowledge in a New Product Development Team: Implications for Knowledge Management

    Science.gov (United States)

    Cooper, Lynne P.

    2009-01-01

    This study was conducted to better understand how New Product Development (NPD) team members apply their experiences to meet the task needs of their project. Although "experience" is highly valued in team members, little research has looked specifically at experiences as a type of knowledge, and how this knowledge is used in work settings. This research evaluated nearly 200 instances where team members referenced past experiences during team meetings. During these experience exchanges, team members structured the sharing of their experiences to include three common elements: the source of the experience, the nature of the experience, and the degree of relevance to the current work of the team. The experiences fell into four categories: people (relationships), process, product, and politics. This paper describes how team members structured, applied, and integrated their individual experiences and presents the resulting implications for knowledge management systems that wish to exploit experience knowledge.

  14. Multidisciplinary safety team (MDST) factors of success.

    Science.gov (United States)

    2014-11-01

    This project included a literature review and summary that focused on subjects related to team building, team/committee member : motivational strategies, and tools for effective and efficient committee meetings. It also completed an online survey of ...

  15. 42 CFR 456.602 - Inspection team.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Inspection team. 456.602 Section 456.602 Public... Institutions for Mental Diseases § 456.602 Inspection team. (a) A team, as described in this section and § 456... team conducting periodic inspections must have a least one member who is at physician or registered...

  16. Team Learning and Team Composition in Nursing

    Science.gov (United States)

    Timmermans, Olaf; Van Linge, Roland; Van Petegem, Peter; Elseviers, Monique; Denekens, Joke

    2011-01-01

    Purpose: This study aims to explore team learning activities in nursing teams and to test the effect of team composition on team learning to extend conceptually an initial model of team learning and to examine empirically a new model of ambidextrous team learning in nursing. Design/methodology/approach: Quantitative research utilising exploratory…

  17. Volunteer Team Management

    OpenAIRE

    Monych, Maria

    2015-01-01

    This thesis looked into volunteer team management in a project in AIESEC in Finland through the action research method. AIESEC in Finland is a non-profit non-government organization with a purpose of “peace and fulfilment of humankinds potential” through development of the youth’s future leadership. AIESEC was not a commissioning party; the project was the basis for the thesis without the supervision of the company. The thesis is based on a project that the author was in charge of, in ...

  18. DIFFERENT DIMENSIONS OF TEAMS

    OpenAIRE

    Goparaju Purna SUDHAKAR

    2013-01-01

    Popularity of teams is growing in 21st Century. Organizations are getting their work done through different types of teams. Teams have proved that the collective performance is more than the sum of the individual performances. Thus, the teams have got different dimensions such as quantitative dimensions and qualitative dimensions. The Quantitative dimensions of teams such as team performance, team productivity, team innovation, team effectiveness, team efficiency, team decision making and tea...

  19. TEAM ORGANISERING

    DEFF Research Database (Denmark)

    Levisen, Vinie; Haugaard, Lena

    2004-01-01

    organisation som denne? Når teams i samtiden anses for at være en organisationsform, der fremmer organisatorisk læring, beror det på, at teamet antages at udgøre et ikke-hierarkisk arbejdsfællesskab, hvor erfaringer udveksles og problemer løses. Teamorganisering kan imidlertid udformes på mange forskellige...

  20. Performance of Student Software Development Teams: The Influence of Personality and Identifying as Team Members

    Science.gov (United States)

    Monaghan, Conal; Bizumic, Boris; Reynolds, Katherine; Smithson, Michael; Johns-Boast, Lynette; van Rooy, Dirk

    2015-01-01

    One prominent approach in the exploration of the variations in project team performance has been to study two components of the aggregate personalities of the team members: conscientiousness and agreeableness. A second line of research, known as self-categorisation theory, argues that identifying as team members and the team's performance norms…

  1. Factors Contributing to Research Team Effectiveness: Testing a Model of Team Effectiveness in an Academic Setting

    Science.gov (United States)

    Omar, Zoharah; Ahmad, Aminah

    2014-01-01

    Following the classic systems model of inputs, processes, and outputs, this study examined the influence of three input factors, team climate, work overload, and team leadership, on research project team effectiveness as measured by publication productivity, team member satisfaction, and job frustration. This study also examined the mediating…

  2. Team skills training

    International Nuclear Information System (INIS)

    Coe, R.P.; Carl, D.R.

    1991-01-01

    Numerous reports and articles have been written recently on the importance of team skills training for nuclear reactor operators, but little has appeared on the practical application of this theoretical guidance. This paper describes the activities of the Training and Education Department at GPU Nuclear (GPUN). In 1987, GPUN undertook a significant initiative in its licensed operator training programs to design and develop initial and requalification team skills training. Prior to that time, human interaction skills training (communication, stress management, supervisory skills, etc.) focused more on the individual rather than a group. Today, GPU Nuclear conducts team training at both its Three Mile Island (YMI), PA and Oyster Creek (OC), NJ generating stations. Videotaped feedback is sued extensively to critique and reinforce targeted behaviors. In fact, the TMI simulator trainer has a built-in, four camera system specifically designed for team training. Evaluations conducted on this training indicated these newly acquired skills are being carried over to the work environment. Team training is now an important and on-going part of GPUN operator training

  3. Virtual Teams and Knowledge Communication

    DEFF Research Database (Denmark)

    Lehtonen, Miikka; Kampf, Constance Elizabeth

    2014-01-01

    How does culture affect virtual teams and the knowledge communication processes in which they engage? As virtual spaces are increasingly used to support teams and establish collaboration in cross-cultural projects, the notion of cross-cultural communication can be understood as shifting from...... contextual perspective to a semiotic perspective. That is to say, although the team members are using the same vocabulary they might attach different meanings to and have different knowledge about them thus highlighting the importance of approaching virtual teams and collaboration from a semiotic perspective....... To look at how knowledge about virtual work is established in a multinational context, we interviewed members of a team that connects Finland and India. Results reveal five objects shared between the team members with varying knowledge about them. By making these differences in knowledge visible through...

  4. Teaching Engineering Students Team Work

    Science.gov (United States)

    Levi, Daniel

    1998-01-01

    The purpose of this manual is to provide professor's in engineering classes which the background necessary to use student team projects effectively. This manual describes some of the characteristics of student teams and how to use them in class. It provides a set of class activities and films which can be used to introduce and support student teams. Finally, a set of teaching modules used in freshmen, sophomore, and senior aeronautical engineering classes are presented. This manual was developed as part of a NASA sponsored project to improve the undergraduate education of aeronautical engineers. The project has helped to purchase a set of team work films which can be checked out from Cal Poly's Learning Resources Center in the Kennedy Library. Research for this project has included literature reviews on team work and cooperative learning; interviews, observations, and surveys of Cal Poly students from Industrial and Manufacturing Engineering, Aeronautical Engineering and Psychology; participation in the Aeronautical Engineering senior design lab; and interviews with engineering faculty. In addition to this faculty manual, there is a student team work manual which has been designed to help engineering students work better in teams.

  5. The Design and Development of a Computerized Tool Support for Conducting Senior Projects in Software Engineering Education

    Science.gov (United States)

    Chen, Chung-Yang; Teng, Kao-Chiuan

    2011-01-01

    This paper presents a computerized tool support, the Meetings-Flow Project Collaboration System (MFS), for designing, directing and sustaining the collaborative teamwork required in senior projects in software engineering (SE) education. Among many schools' SE curricula, senior projects serve as a capstone course that provides comprehensive…

  6. Turbine and Structural Seals Team Facilities

    Data.gov (United States)

    Federal Laboratory Consortium — Seals Team Facilities conceive, develop, and test advanced turbine seal concepts to increase efficiency and durability of turbine engines. Current projects include...

  7. [Team training and assessment in mixed reality-based simulated operating room : Current state of research in the field of simulation in spine surgery exemplified by the ATMEOS project].

    Science.gov (United States)

    Stefan, P; Pfandler, M; Wucherer, P; Habert, S; Fürmetz, J; Weidert, S; Euler, E; Eck, U; Lazarovici, M; Weigl, M; Navab, N

    2018-04-01

    Surgical simulators are being increasingly used as an attractive alternative to clinical training in addition to conventional animal models and human specimens. Typically, surgical simulation technology is designed for the purpose of teaching technical surgical skills (so-called task trainers). Simulator training in surgery is therefore in general limited to the individual training of the surgeon and disregards the participation of the rest of the surgical team. The objective of the project Assessment and Training of Medical Experts based on Objective Standards (ATMEOS) is to develop an immersive simulated operating room environment that enables the training and assessment of multidisciplinary surgical teams under various conditions. Using a mixed reality approach, a synthetic patient model, real surgical instruments and radiation-free virtual X‑ray imaging are combined into a simulation of spinal surgery. In previous research studies, the concept was evaluated in terms of realism, plausibility and immersiveness. In the current research, assessment measurements for technical and non-technical skills are developed and evaluated. The aim is to observe multidisciplinary surgical teams in the simulated operating room during minimally invasive spinal surgery and objectively assess the performance of the individual team members and the entire team. Moreover, the effectiveness of training methods and surgical techniques or success critical factors, e. g. management of crisis situations, can be captured and objectively assessed in the controlled environment.

  8. Impacts of dairy diagnostic teams on herd performance.

    Science.gov (United States)

    Weinand, D; Conlin, B J

    2003-05-01

    This study evaluated impacts of educational diagnostic teams of consultants used to transfer technology to dairy farms. Herd management performance changes were measured by comparing Dairy Herd Improvement data from 38 project farms to data from herds that were geographical contemporaries. The value of focused goals for effecting change was also assessed. Interviews provided producers' perception of project outcomes and insight on organization and conduct of dairy diagnostic teams. Changes observed in project herds were small compared with controls with tendencies for increased herd size and improved milk production per cow. Focused goals had greater impacts on increasing herd size, milk per cow, first lactation peak milk, reducing age at first calving, and percentages of cows with subclinical mastitis. Time, money, facility limitations, labor, and alternative priorities were the most cited constraints to implementing changes. Satisfaction scores of producers were significantly related to the degree that team recommendations were followed. Improved attitudes, quality of life, and financial well-being were benefits listed by a majority of producers from participation in the project. If similar projects were to be offered, 83% said they would participate again, and 69% indicated they would pay at least some of the costs. Project farms served as demonstration farms for 1930 other producers in their respective locales, resulting in a multiplier effect of original advice given by consultant teams. Suggestions by farmer participants for improvements in dairy diagnostic teams included needs for at least some unbiased team members, more frequent meetings, more follow-up on recommendations, and consistency of recommendations with family goals.

  9. Asteroid team

    International Nuclear Information System (INIS)

    Matson, D.L.

    1988-01-01

    The purpose of this task is to support asteroid research and the operation of an Asteroid Team within the Earth and Space Sciences Division at the Jet Propulsion Laboratory (JPL). The Asteroid Team carries out original research on asteroids in order to discover, better characterize and define asteroid properties. This information is needed for the planning and design of NASA asteroid flyby and rendezvous missions. The asteroid Team also provides scientific and technical advice to NASA and JPL on asteroid related programs. Work on asteroid classification continued and the discovery of two Earth-approaching M asteroids was published. In the asteroid photometry program researchers obtained N or Q photometry for more than 50 asteroids, including the two M-earth-crossers. Compositional analysis of infrared spectra (0.8 to 2.6 micrometer) of asteroids is continuing. Over the next year the work on asteroid classification and composition will continue with the analysis of the 60 reduced infrared spectra which we now have at hand. The radiometry program will continue with the reduction of the N and Q bandpass data for the 57 asteroids in order to obtain albedos and diameters. This year the emphasis will shift to IRAS follow-up observations; which includes objects not observed by IRAS and objects with poor or peculiar IRAS data. As in previous year, we plan to give top priority to any opportunities for observing near-Earth asteroids and the support (through radiometric lightcurve observations from the IRTF) of any stellar occultations by asteroids for which occultation observation expeditions are fielded. Support of preparing of IRAS data for publication and of D. Matson for his participation in the NASA Planetary Astronomy Management and Operations Working Group will continue

  10. Asteroid team

    Science.gov (United States)

    Matson, D. L.

    1988-01-01

    The purpose of this task is to support asteroid research and the operation of an Asteroid Team within the Earth and Space Sciences Division at the Jet Propulsion Laboratory (JPL). The Asteroid Team carries out original research on asteroids in order to discover, better characterize and define asteroid properties. This information is needed for the planning and design of NASA asteroid flyby and rendezvous missions. The asteroid Team also provides scientific and technical advice to NASA and JPL on asteroid related programs. Work on asteroid classification continued and the discovery of two Earth-approaching M asteroids was published. In the asteroid photometry program researchers obtained N or Q photometry for more than 50 asteroids, including the two M-earth-crossers. Compositional analysis of infrared spectra (0.8 to 2.6 micrometer) of asteroids is continuing. Over the next year the work on asteroid classification and composition will continue with the analysis of the 60 reduced infrared spectra which we now have at hand. The radiometry program will continue with the reduction of the N and Q bandpass data for the 57 asteroids in order to obtain albedos and diameters. This year the emphasis will shift to IRAS follow-up observations; which includes objects not observed by IRAS and objects with poor or peculiar IRAS data. As in previous year, we plan to give top priority to any opportunities for observing near-Earth asteroids and the support (through radiometric lightcurve observations from the IRTF) of any stellar occultations by asteroids for which occultation observation expeditions are fielded. Support of preparing of IRAS data for publication and of D. Matson for his participation in the NASA Planetary Astronomy Management and Operations Working Group will continue.

  11. Exploring the concept of a team approach to wound care: Managing wounds as a team.

    Science.gov (United States)

    Moore, Zena; Butcher, Gillian; Corbett, Lisa Q; McGuiness, William; Snyder, Robert J; van Acker, Kristien

    2014-05-01

    Background - The growing prevalence and incidence of nonhealing acute and chronic wounds is a worrying concern. A major challenge is the lack of united services aimed at addressing the complex needs of individuals with wounds. However, the WHO argues that interprofessional collaboration in education and practice is key to providing the best patient care, enhancing clinical and health-related outcomes and strengthening the health system. It is based on this background that the team approach to wound care project was conceptualised. The project was jointly initiated and realised by the Association for the Advancement of Wound Care (AAWC-USA), the Australian Wound Management Association (AWMA) and the European Wound Management Association (EWMA). Aim - The aim of this project was to develop a universal model for the adoption of a team approach to wound care. Objective The overarching objective of this project was to provide recommendations for implementing a team approach to wound care within all clinical settings and through this to develop a model for advocating the team approach toward decision makers in national government levels. Method An integrative literature review was conducted. Using this knowledge, the authors arrived at a consensus on the most appropriate model to adopt and realise a team approach to wound care. Results - Eighty four articles met the inclusion criteria. Following data extraction, it was evident that none of the articles provided a definition for the terms multidisciplinary, interdisciplinary or transdisciplinary in the context of wound care. Given this lack of clarity within the wound care literature, the authors have here developed a Universal Model for the Team Approach to Wound Care to fill this gap in our current understanding. Conclusion - We advocate that the patient should be at the heart of all decision-making, as working with the Universal Model for the Team Approach to Wound Care begins with the needs of the patient. To

  12. Forming Student Online Teams for Maximum Performance

    Science.gov (United States)

    Olson, Joel D.; Ringhand, Darlene G.; Kalinski, Ray C.; Ziegler, James G.

    2015-01-01

    What is the best way to assign graduate business students to online team-based projects? Team assignments are frequently made on the basis of alphabet, time zones or previous performance. This study reviews personality as an indicator of student online team performance. The personality assessment IDE (Insights Discovery Evaluator) was administered…

  13. Improving supervision: a team approach.

    Science.gov (United States)

    1993-01-01

    This issue of "The Family Planning Manager" outlines an interactive team supervision strategy as a means of improving family planning service quality and enabling staff to perform to their maximum potential. Such an approach to supervision requires a shift from a monitoring to a facilitative role. Because supervisory visits to the field are infrequent, the regional supervisor, clinic manager, and staff should form a team to share ongoing supervisory responsibilities. The team approach removes individual blame and builds consensus. An effective team is characterized by shared leadership roles, concrete work problems, mutual accountability, an emphasis on achieving team objectives, and problem resolution within the group. The team supervision process includes the following steps: prepare a visit plan and schedule; meet with the clinic manager and staff to explain how the visit will be conducted; supervise key activity areas (clinical, management, and personnel); conduct a problem-solving team meeting; conduct a debriefing meeting with the clinic manager; and prepare a report on the visit, including recommendations and follow-up plans. In Guatemala's Family Planning Unit, teams identify problem areas on the basis of agreement that a problem exists, belief that the problem can be solved with available resources, and individual willingness to accept responsibility for the specific actions identified to correct the problem.

  14. Quality charters or quality members? A control theory perspective on team charters and team performance.

    Science.gov (United States)

    Courtright, Stephen H; McCormick, Brian W; Mistry, Sal; Wang, Jiexin

    2017-10-01

    Though prevalent in practice, team charters have only recently received scholarly attention. However, most of this work has been relatively devoid of theory, and consequently, key questions about why and under what conditions team charter quality affects team performance remain unanswered. To address these gaps, we draw on macro organizational control theory to propose that team charter quality serves as a team-level "behavior" control mechanism that builds task cohesion through a structured exercise. We then juxtapose team charter quality with an "input" team control mechanism that influences the emergence of task cohesion more organically: team conscientiousness. Given their redundant effects on task cohesion, we propose that the effects of team charter quality and team conscientiousness on team performance (through task cohesion) are substitutive such that team charter quality primarily impacts team performance for teams that are low (vs. high) on conscientiousness. We test and find support for our hypotheses in a sample of 239 undergraduate self-managing project teams. Our study contributes to the groups and teams literature in the following ways: first, relative to previous studies, we take a more theory-driven approach toward understanding team charters, and in doing so, uncover when and why team charter quality impacts team performance; second, we integrate two normally disparate perspectives on team effectiveness (team development and team selection) to offer a broader perspective on how teams are "built"; and third, we introduce team charter quality as a performance-enhancing mechanism for teams lower on conscientiousness. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  15. Team designing

    DEFF Research Database (Denmark)

    Denise J. Stokholm, Marianne

    2012-01-01

    Future wellbeing is depending on human competences in order to strengthen a sustainable development. This requires system thinking and ability to deal with complexity, dynamic and a vast of information. `We need to move away from present principles of breaking down problems into components and gi...... thinking and communication in design. Trying to answer the question: How can visual system models facilitate learning in design thinking and team designing?......Future wellbeing is depending on human competences in order to strengthen a sustainable development. This requires system thinking and ability to deal with complexity, dynamic and a vast of information. `We need to move away from present principles of breaking down problems into components and give...... in relation to a design-engineering education at Aalborg University. It will exemplify how the model has been used in workshops on team designing, challenged design learning and affected design competence. In specific it will investigate the influence of visual models of the perception of design, design...

  16. Project TEAMS (Talking about Eating, Activity, and Mutual Support: a randomized controlled trial of a theory-based weight loss program for couples

    Directory of Open Access Journals (Sweden)

    Amy A. Gorin

    2017-09-01

    Full Text Available Abstract Background Obesity risk is shared between spouses, yet existing weight loss programs focus on individuals and not the marital dyad. Given the interdependence of weight in couples, weight management outcomes might be improved by targeting joint weight loss and the creation of an interpersonal milieu that supports long-term behavior change. According to Self-Determination Theory (SDT, greater autonomous self-regulation of behaviors, and subsequently better treatment outcomes, are observed in needs supportive environments in which personally meaningful choice is supported and criticism and control are minimized. Correlational analyses confirm these pathways in weight management, with needs support from one’s spouse or partner emerging as a distinct predictor of weight loss success. Research is now needed to establish causal links and to develop and test weight loss interventions designed to facilitate the needs supportive behavior of spouses. Methods Project TEAMS (Talking about Eating, Activity, and Mutual Support is a randomized controlled trial testing a couples-based intervention, grounded in SDT, designed to change the social context of weight loss by training spouses to provide needs support for each other’s eating and physical activity behavior. Sixty-four couples will be randomized to either 6 months of behavioral weight loss treatment informed by SDT (SDT-WL or to 6 months of standard behavioral weight loss treatment (BWL. Couples will attend weekly sessions for 6 months and will be assessed at 0, 3, 6, and 12 months. By bolstering needs support, SDT-WL is predicted to increase autonomous self-regulation and perceived competence and produce greater weight loss and maintenance than standard behavioral treatment. Exploratory analyses will examine the SDT process model prediction that the influence of needs support on treatment outcomes will be mediated by autonomous self-regulation and perceived competence. Discussion This

  17. Project TEAMS (Talking about Eating, Activity, and Mutual Support): a randomized controlled trial of a theory-based weight loss program for couples.

    Science.gov (United States)

    Gorin, Amy A; Powers, Theodore A; Gettens, Katelyn; Cornelius, Talea; Koestner, Richard; Mobley, Amy R; Pescatello, Linda; Medina, Tania Huedo

    2017-09-29

    Obesity risk is shared between spouses, yet existing weight loss programs focus on individuals and not the marital dyad. Given the interdependence of weight in couples, weight management outcomes might be improved by targeting joint weight loss and the creation of an interpersonal milieu that supports long-term behavior change. According to Self-Determination Theory (SDT), greater autonomous self-regulation of behaviors, and subsequently better treatment outcomes, are observed in needs supportive environments in which personally meaningful choice is supported and criticism and control are minimized. Correlational analyses confirm these pathways in weight management, with needs support from one's spouse or partner emerging as a distinct predictor of weight loss success. Research is now needed to establish causal links and to develop and test weight loss interventions designed to facilitate the needs supportive behavior of spouses. Project TEAMS (Talking about Eating, Activity, and Mutual Support) is a randomized controlled trial testing a couples-based intervention, grounded in SDT, designed to change the social context of weight loss by training spouses to provide needs support for each other's eating and physical activity behavior. Sixty-four couples will be randomized to either 6 months of behavioral weight loss treatment informed by SDT (SDT-WL) or to 6 months of standard behavioral weight loss treatment (BWL). Couples will attend weekly sessions for 6 months and will be assessed at 0, 3, 6, and 12 months. By bolstering needs support, SDT-WL is predicted to increase autonomous self-regulation and perceived competence and produce greater weight loss and maintenance than standard behavioral treatment. Exploratory analyses will examine the SDT process model prediction that the influence of needs support on treatment outcomes will be mediated by autonomous self-regulation and perceived competence. This study addresses the fundamental importance of interpersonal

  18. The Team to Address Bariatric Care in Canadian Children (Team ABC3): Team Grant Research Proposal.

    Science.gov (United States)

    2017-10-05

    Severe obesity (SO) in Canadian children remains poorly understood. However, based on international data, the prevalence of SO appears to be increasing and is associated with a number of psychosocial, bio-mechanical, and cardiometabolic health risks. The purpose of our national Team to Address Bariatric Care in Canadian Children (Team ABC3) is to develop and lead a series of inter-related studies to enhance the understanding and management of SO in Canadian children and adolescents (0-18 years). From 2015 to 2019, Team ABC3 will conduct a series of projects at the regional, provincial, and national levels using multiple methods and study designs to respond to key knowledge gaps by (i) generating evidence on the prevalence of SO and its impact on health services utilization in children using existing Canadian data sources from primary care settings, (ii) exploring contemporary definitions of SO that link with health outcomes, (iii) comparing and contrasting health risks across the continuum of SO, (iv) understanding potential barriers to and facilitators of treatment success in children with SO, and (v) examining innovative lifestyle and behavioral interventions designed to successfully manage SO in children and their families. Furthermore, to examine the impact of innovative interventions on the management SO, we will (vi) evaluate whether adding a health coach, who provides support via text, email, and/or phone, improves children's ability to adhere to a web-based weight management program and (vii) test the feasibility and impact of a community-based weight management program for pre-school children with SO and their parents that combines group-based parenting sessions with in-home visits. Our research aligns with national priorities in obesity research, brings together leading scientists, clinicians, and stakeholders from across Canada, and will inform health services delivery throughout the country to provide the best care possible for children with SO and

  19. Developing Marine Science Instructional Materials Using Integrated Scientist-Educator Collaborative Design Teams: A Discussion of Challenges and Success Developing Real Time Data Projects for the COOL Classroom

    Science.gov (United States)

    McDonnell, J.; Duncan, R. G.; Glenn, S.

    2007-12-01

    Current reforms in science education place increasing demands on teachers and students to engage not only with scientific content but also to develop an understanding of the nature of scientific inquiry (AAAS, 1993; NRC, 1996). Teachers are expected to engage students with authentic scientific practices including posing questions, conducting observations, analyzing data, developing explanations and arguing about them using evidence. This charge is challenging for many reasons most notably the difficulty in obtaining meaningful data about complex scientific phenomena that can be used to address relevant scientific questions that are interesting and understandable to K-12 students. We believe that ocean sciences provide an excellent context for fostering scientific inquiry in the classroom. Of particular interest are the technological and scientific advances of Ocean Observing Systems, which allow scientists to continuously interact with instruments, facilities, and other scientists to explore the earth-ocean- atmosphere system remotely. Oceanographers are making long-term measurements that can also resolve episodic oceanic processes on a wide range of spatial and temporal scales crucial to resolving scientific questions related to Earth's climate, geodynamics, and marine ecosystems. The availability of a diverse array of large data sets that are easily accessible provides a unique opportunity to develop inquiry-based learning environments in which students can explore many important questions that reflect current research trends in ocean sciences. In addition, due to the interdisciplinary nature of the ocean sciences these data sets can be used to examine ocean phenomena from a chemical, physical, or biological perspective; making them particularly useful for science teaching across the disciplines. In this session we will describe some of the efforts of the Centers for Ocean Sciences Education Excellence- Mid Atlantic (COSEE MA) to develop instructional materials

  20. Hospital-based child protection teams that care for parents who abuse or neglect their children recognize the need for multidisciplinary collaborative practice involving perinatal care and mental health professionals: a questionnaire survey conducted in Japan.

    Science.gov (United States)

    Okato, Ayumi; Hashimoto, Tasuku; Tanaka, Mami; Tachibana, Masumi; Machizawa, Akira; Okayama, Jun; Endo, Mamiko; Senda, Masayoshi; Saito, Naoki; Iyo, Masaomi

    2018-01-01

    Child abuse and/or neglect is a serious issue, and in many cases, parents are the perpetrators. Hospital-based child protection teams (CPTs) play pivotal roles in the management of not only abused and/or neglected children but also of their parents; this is generally conducted through multidisciplinary practice. The aim of this study is to survey hospital-based CPT members to determine the professions they perceive to be most applicable to participation in CPTs. The participants were members of CPTs affiliated with hospitals that had pediatric emergency departments and which were located in Chiba Prefecture; specifically, 114 CPT members from 23 hospitals responded to this survey. The two main questionnaire items concerned are as follows: 1) each respondent's evaluation of conducting assessments, providing support, and implementing multidisciplinary collaborative practice in the treatment of abusive and negligent parents, and 2) each CPT member's opinion on the professions that are most important for CPT activities. An exploratory factor analysis (EFA) was performed to explore the factor structure of the data, and a correlation analysis was performed using the result obtained. The EFA returned two factors: multidisciplinary collaborative practice (α = 0.84) and assessment and support (α = 0.89). A correlational analysis showed that multidisciplinary collaborative practice had a positive correlation for obstetricians ( r = 0.315, p = 0.001), neonatologists ( r = 0.261, p = 0.007), midwives ( r = 0.248, p = 0.011), and psychiatrists ( r = 0.194, p = 0.048); however, assessment and support was only significantly correlated with midwives ( r = 0.208, p = 0.039). This study showed that hospital-based CPT members highly evaluate multidisciplinary collaborative practice for the management of abusive and/or negligent parents, and they believe that, in addition to pediatric physicians and nurses, perinatal care and mental health professionals are the most important

  1. Travelling with football teams

    African Journals Online (AJOL)

    ultimately on the performance of the teams on the playing field and not so much ... However, travelling with a football team presents the team physician .... physician to determine the nutritional ..... diarrhoea in elite athletes: an audit of one team.

  2. Study on team evaluation. Team process model for team evaluation

    International Nuclear Information System (INIS)

    Sasou Kunihide; Ebisu, Mitsuhiro; Hirose, Ayako

    2004-01-01

    Several studies have been done to evaluate or improve team performance in nuclear and aviation industries. Crew resource management is the typical example. In addition, team evaluation recently gathers interests in other teams of lawyers, medical staff, accountants, psychiatrics, executive, etc. However, the most evaluation methods focus on the results of team behavior that can be observed through training or actual business situations. What is expected team is not only resolving problems but also training younger members being destined to lead the next generation. Therefore, the authors set the final goal of this study establishing a series of methods to evaluate and improve teams inclusively such as decision making, motivation, staffing, etc. As the first step, this study develops team process model describing viewpoints for the evaluation. The team process is defined as some kinds of power that activate or inactivate competency of individuals that is the components of team's competency. To find the team process, the authors discussed the merits of team behavior with the experienced training instructors and shift supervisors of nuclear/thermal power plants. The discussion finds four team merits and many components to realize those team merits. Classifying those components into eight groups of team processes such as 'Orientation', 'Decision Making', 'Power and Responsibility', 'Workload Management', 'Professional Trust', 'Motivation', 'Training' and 'staffing', the authors propose Team Process Model with two to four sub processes in each team process. In the future, the authors will develop methods to evaluate some of the team processes for nuclear/thermal power plant operation teams. (author)

  3. Consequences of team charter quality: Teamwork mental model similarity and team viability in engineering design student teams

    Science.gov (United States)

    Conway Hughston, Veronica

    relationship. Foci for future research opportunities include using: a) online data collection methods to improve participant adherence to similarity rating instructions; b) story or narratives during pre- and posttest similarity rating data collection to create common levels of contextual perception; and c) support to ensure charters are integrated into the full project life cycle, not just a pre-project one time isolated activity. Twenty five sections, on average, of EDSGN 100 are taught each spring and fall semester. Consistent instructor expectations are set for the technical aspects of the course. However, ideas to foster team effectiveness are often left to the discretion of the individual instructor. Implementing empirically tested team effectiveness instructional activities would bring consistency to EDGSN 100 curriculum. Other instructional activities that would be of benefit to engineering educators include qualitative inquiry---asking intrateam process questions (at the mid-point of the project) and in-class reflection---dedicated time, post project, to discuss what went well/not well within the team.

  4. Toward a Theory of Information System Development Success: Perceptions of Software Development Team Members

    OpenAIRE

    Zelazny, Lucian M.

    2011-01-01

    This dissertation increases our understanding of information system project success by investigating how software development team members define the success of an information system development effort. The theoretical model of ISD success is developed and tested. ISD success is measured through the eyes of the software development team membersâ since they are the most influential stakeholders during the development of the system. This dissertation was conducted in two phases: 1) theo...

  5. Team responsibility structure and team performance

    NARCIS (Netherlands)

    Doorewaard, J.A.C.M.; Hootegem, G. van; Huys, R.

    2002-01-01

    The purpose is to analyse the impact of team responsibility (the division of job regulation tasks between team leader and team members) on team performance. It bases an analysis on 36 case studies in The Netherlands which are known to have implemented team‐based work. The case studies were executed

  6. 7 CFR 1484.34 - Must Cooperators adhere to specific standards of ethical conduct?

    Science.gov (United States)

    2010-01-01

    ... Cooperators adhere to specific standards of ethical conduct? (a) A Cooperator shall conduct its business in... funds to promote private self interests or conduct private business, except as members of sales teams... advertising. Deceptive or misleading promotions may result in cancellation or termination of a project...

  7. The Workings of a Multicultural Research Team

    Science.gov (United States)

    Friedemann, Marie-Luise; Pagan-Coss, Harald; Mayorga, Carlos

    2013-01-01

    Purpose Transcultural nurse researchers are exposed to the challenges of developing and maintaining a multiethnic team. With the example of a multicultural research study of family caregivers conducted in the Miami-Dade area, the authors guide the readers through steps of developing a culturally competent and effective team. Design Pointing out challenges and successes, the authors illustrate team processes and successful strategies relative to recruitment of qualified members, training and team maintenance, and evaluation of team effectiveness. Method With relevant concepts from the literature applied to practical examples, the authors demonstrate how cultural team competence grows in a supportive work environment. PMID:18390824

  8. What are the communication challenges for politicians, experts and stakeholders in order to enhance transparency in nuclear waste management decisions? Report from a Team Syntegrity Meeting. The European Project RISCOM-II. Work Package 3

    International Nuclear Information System (INIS)

    Andersson, Kjell; Espejo, Raul; Wene, Clas-Otto

    2003-09-01

    The Team Syntegrity Meeting is a special part of the project. It aims for increased awareness among key stakeholder groups in Europe about how nuclear waste decision processes should be developed in order to increase transparency and trust. Team Syntegrity is conducted with a special meeting format. The self-organisation of the meeting is a strong positive feature of the format. Instead of having a project leader setting the agenda, the participants formulate their own topics of relevance starting from an opening question. This report documents the meeting that was held in Lanaken, Belgium on 14-17 May 2002. The opening question for the meeting was: What are communication challenges for politicians, experts and stakeholders in order to enhance transparency in nuclear waste management decisions? There are different opinions about how communication on nuclear waste issues should be done. There are differences between stakeholder groups, and there are different approaches taken in various countries. Still it should be possible to reach a deeper understanding of social communications, that is, understanding the requirements to have effective communications between policy makers, experts and stakeholders. The aim was thus not to develop common views on the nuclear waste problem as such, but rather common grounds for developing procedures for effective communication. Hopefully, this meeting made some progress in this direction. The call for the Team Syntegrity (TS) Meeting resulted in 105 Statements of Importance given in Appendix 2. Following the TS format the meeting then formed its own agenda by first producing 30 Aggregated Statements of Importance (Appendix 3), which were grouped into 12 Consolidated Statements of Importance or topics. The group discussions were thus held under the twelve topics of: Consultation, communication and participation; Mutual learning; Roles and arenas; Heritage; Transparency; Wider context; Process; Risk; Institutional cultures

  9. What are the communication challenges for politicians, experts and stakeholders in order to enhance transparency in nuclear waste management decisions? Report from a Team Syntegrity Meeting. The European Project RISCOM-II. Work Package 3

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Kjell [Karinta-Konsult, Taeby (Sweden); Espejo, Raul [Syncho Ltd., Birmingham (United Kingdom); Wene, Clas-Otto [Wenergy, Lund (Sweden)

    2003-09-01

    The Team Syntegrity Meeting is a special part of the project. It aims for increased awareness among key stakeholder groups in Europe about how nuclear waste decision processes should be developed in order to increase transparency and trust. Team Syntegrity is conducted with a special meeting format. The self-organisation of the meeting is a strong positive feature of the format. Instead of having a project leader setting the agenda, the participants formulate their own topics of relevance starting from an opening question. This report documents the meeting that was held in Lanaken, Belgium on 14-17 May 2002. The opening question for the meeting was: What are communication challenges for politicians, experts and stakeholders in order to enhance transparency in nuclear waste management decisions? There are different opinions about how communication on nuclear waste issues should be done. There are differences between stakeholder groups, and there are different approaches taken in various countries. Still it should be possible to reach a deeper understanding of social communications, that is, understanding the requirements to have effective communications between policy makers, experts and stakeholders. The aim was thus not to develop common views on the nuclear waste problem as such, but rather common grounds for developing procedures for effective communication. Hopefully, this meeting made some progress in this direction. The call for the Team Syntegrity (TS) Meeting resulted in 105 Statements of Importance given in Appendix 2. Following the TS format the meeting then formed its own agenda by first producing 30 Aggregated Statements of Importance (Appendix 3), which were grouped into 12 Consolidated Statements of Importance or topics. The group discussions were thus held under the twelve topics of: Consultation, communication and participation; Mutual learning; Roles and arenas; Heritage; Transparency; Wider context; Process; Risk; Institutional cultures

  10. SOAP in practice: learning outcomes of a cross-institutional innovation project conducted by teachers, student teachers, and teacher educators

    NARCIS (Netherlands)

    Prof. Dr. Rob F. Poell; Dr. Audrey Seezink; Prof. Dr. Paul A. Kirschner

    2010-01-01

    This paper reports on a case study investigating learning outcomes at the individual and organisational level of a cross-institutional innovation project based on the SOAP approach. SOAP integrates Schooling of teachers, Organisational development of schools, Action- and development-oriented

  11. SOAP in Practice: Learning Outcomes of a Cross-Institutional Innovation Project Conducted by Teachers, Student Teachers, and Teacher Educators

    Science.gov (United States)

    Seezink, Audrey; Poell, Rob; Kirschner, Paul

    2010-01-01

    This paper reports on a case study investigating learning outcomes at the individual and organisational level of a cross-institutional innovation project based on the SOAP approach. SOAP integrates "S"chooling of teachers, "O"rganisational development of schools, "A"ction- and development-oriented research, and…

  12. Learning to learn with farmers : a case study of an adult learning extension project conducted in Queensland, Australia 1990 - 1995

    NARCIS (Netherlands)

    Hamilton, N.A.

    1995-01-01

    In this thesis, the relationship between the use of participatory processes in the development and use of information and knowledge and their impact on change is described and explored. This research utilises a major extension project carried out with respect to fallow management in

  13. Individual activities as an integrated part of project work - an innovative approach to project oriented and problem-based learning POPBL

    DEFF Research Database (Denmark)

    Moesby, Egon; Winther, Hans Henrik; Kørnøv, Lone

    2006-01-01

    in an individual activity to subsequently be separately assessed. The results of the individually oriented project work form the platform for final work with the project as a team. The students in each team are expected to evaluate the individual solutions and select the one solution to work on in the final phases......In this paper, the authors describe and, on the basis of a recently conducted survey, evaluate a way to increase student learning through the introduction of an individual project activity to the project oriented and problem-based and team-based project work - POPBL. This can be achieved not just...... by adding an individual activity outside or parallel to the project work, but by having the individual activity embedded as an integrated part of the overall team-based project work. In what the authors have deemed the extended project model, students work individually in the solution phase of the project...

  14. Team training process for nuclear plant technicians

    International Nuclear Information System (INIS)

    Macris, A.C.

    1987-01-01

    The purpose of team training is the cooperative and coordinated actions of individual to attain a common goal. Such training requires the development of more sophisticated educational techniques than those previously established for training individuals alone. Extensive research has been conducted to devise methods and techniques to bring about effective team training. This paper discusses current team training methods and present an instructional strategy for the application of effective team training techniques

  15. Sounds like Team Spirit

    Science.gov (United States)

    Hoffman, Edward

    2002-01-01

    I recently accompanied my son Dan to one of his guitar lessons. As I sat in a separate room, I focused on the music he was playing and the beautiful, robust sound that comes from a well-played guitar. Later that night, I woke up around 3 am. I tend to have my best thoughts at this hour. The trouble is I usually roll over and fall back asleep. This time I was still awake an hour later, so I got up and jotted some notes down in my study. I was thinking about the pure, honest sound of a well-played instrument. From there my mind wandered into the realm of high-performance teams and successful projects. (I know this sounds weird, but this is the sort of thing I think about at 3 am. Maybe you have your own weird thoughts around that time.) Consider a team in relation to music. It seems to me that a crack team can achieve a beautiful, perfect unity in the same way that a band of brilliant musicians can when they're in harmony with one another. With more than a little satisfaction I have to admit, I started to think about the great work performed for you by the Knowledge Sharing team, including this magazine you are reading. Over the past two years I personally have received some of my greatest pleasures as the APPL Director from the Knowledge Sharing activities - the Masters Forums, NASA Center visits, ASK Magazine. The Knowledge Sharing team expresses such passion for their work, just like great musicians convey their passion in the music they play. In the case of Knowledge Sharing, there are many factors that have made this so enjoyable (and hopefully worthwhile for NASA). Three ingredients come to mind -- ingredients that have produced a signature sound. First, through the crazy, passionate playing of Alex Laufer, Michelle Collins, Denise Lee, and Todd Post, I always know that something startling and original is going to come out of their activities. This team has consistently done things that are unique and innovative. For me, best of all is that they are always

  16. Better team management--better team care?

    Science.gov (United States)

    Shelley, P; Powney, B

    1994-01-01

    Team building should not be a 'bolt-on' extra, it should be a well planned, integrated part of developing teams and assisting their leaders. When asked to facilitate team building by a group of NHS managers we developed a framework which enabled individual members of staff to become more effective in the way they communicated with each other, their teams and in turn within the organization. Facing the challenge posed by complex organizational changes, staff were able to use 3 training days to increase and develop their awareness of the principles of teamwork, better team management, and how a process of leadership and team building could help yield better patient care.

  17. Multidisciplinary team care in rehabilitation

    DEFF Research Database (Denmark)

    Momsen, A.-M.; Nielsen, C.V.; Rasmussen, J.O.

    2012-01-01

    Objectives: To systematically investigate current scientific evidence about the effectiveness of multidisciplinary team rehabilitation for different health problems. Data sources: A comprehensive literature search was conducted in Cochrane, Medline, DARE, Embase, and Cinahl databases, and research...... for adults, without restrictions in terms of study population or outcomes. The most recent reviews examining a study population were selected. Data extraction: Two reviewers independently extracted information about study populations, sample sizes, study designs, rehabilitation settings, the team...

  18. Seismic calibration shots conducted in 2009 in the Imperial Valley, southern California, for the Salton Seismic Imaging Project (SSIP)

    Science.gov (United States)

    Murphy, Janice; Goldman, Mark; Fuis, Gary; Rymer, Michael; Sickler, Robert; Miller, Summer; Butcher, Lesley; Ricketts, Jason; Criley, Coyn; Stock, Joann; Hole, John; Chavez, Greg

    2011-01-01

    Rupture of the southern section of the San Andreas Fault, from the Coachella Valley to the Mojave Desert, is believed to be the greatest natural hazard facing California in the near future. With an estimated magnitude between 7.2 and 8.1, such an event would result in violent shaking, loss of life, and disruption of lifelines (freeways, aqueducts, power, petroleum, and communication lines) that would bring much of southern California to a standstill. As part of the Nation's efforts to prevent a catastrophe of this magnitude, a number of projects are underway to increase our knowledge of Earth processes in the area and to mitigate the effects of such an event. One such project is the Salton Seismic Imaging Project (SSIP), which is a collaborative venture between the United States Geological Survey (USGS), California Institute of Technology (Caltech), and Virginia Polytechnic Institute and State University (Virginia Tech). This project will generate and record seismic waves that travel through the crust and upper mantle of the Salton Trough. With these data, we will construct seismic images of the subsurface, both reflection and tomographic images. These images will contribute to the earthquake-hazard assessment in southern California by helping to constrain fault locations, sedimentary basin thickness and geometry, and sedimentary seismic velocity distributions. Data acquisition is currently scheduled for winter and spring of 2011. The design and goals of SSIP resemble those of the Los Angeles Region Seismic Experiment (LARSE) of the 1990's. LARSE focused on examining the San Andreas Fault system and associated thrust-fault systems of the Transverse Ranges. LARSE was successful in constraining the geometry of the San Andreas Fault at depth and in relating this geometry to mid-crustal, flower-structure-like decollements in the Transverse Ranges that splay upward into the network of hazardous thrust faults that caused the 1971 M 6.7 San Fernando and 1987 M 5

  19. Breaking the Myth of Flexible Work: Contingent Work in Toronto. A Study Conducted by the Contingent Workers Project.

    Science.gov (United States)

    de Wolff, Alice

    A survey of 205 people, 4 group interviews with approximately 30 people, and 6 design and analysis meetings involving approximately 40 people were conducted in a 1999 participatory study of contingent workers in Toronto. (Contingent work was defined to be lower-waged forms of non-permanent work arrangements that include contracting, employment…

  20. Work team

    Directory of Open Access Journals (Sweden)

    RBE Editorial

    2016-06-01

    Full Text Available Work Team 2016 (Jan-Jul1. Editorial TeamChief-editorsBayardo Bapstista Torres, Instituto de Química (USP, BrasilEduardo Galembeck, Depto. Bioquímica, Instituto de Biologia, Universidade de Campinas (Unicamp, Brasil Co-editorsGabriel Gerber Hornink, Depto. Bioquímica, Instituto de Ciências Biomédicas, Universidade - Federal de Alfenas (Unifal-MG, BrasilVera Maria Treis Trindade, Departamento de Bioquímica, Instituto de Ciências Básicas da Saúde, Universidade Federal do Rio Grande do Sul (UFRGS, Brasil Editorial BoardAdriana Cassina, Department of Biochemistry, Facultad de Medicina, Universidad de la República, UruguayAngel Herráez, Departamento de Bioquímica y Biología molecular, Universidad de Alcalá de Henares, Madrid, SpainAndré Amaral Gonçalves Bianco, Universidade Federal de São Paulo (Unifesp, BrasilDenise Vaz de Macedo, Depto. Bioquímica, Instituto de Biologia, Universidade Estadual de Campinas (Unicamp, BrasilEneida de Paula, Depto. Bioquímica, Instituto de Biologia, Universidade Estadual de Campinas (Unicamp, BrasilJose Antonio Martinez Oyanedel, Universidad de Concepción, ChileJosep Maria Fernández Novell, Department of Molecular Biology & Biochemistry, Universitat de Barcelona, SpainLeila Maria Beltramini, Instituto de Física de São Carlos, Universidade Estadual de São Paulo (USP, BrasilManuel João da Costa, Escola de Ciências da Saúde, Universidade do Minho, PortugalMaria Lucia Bianconi, Instituto de Bioquímica Médica, Universidade Federal do Rio de Janeiro (UFRJ, BrasilMaría Noel Alvarez, Department of Biochemistry, Facultad de Medicina, Universidad de la República, UruguayMiguel Ángel Medina Torres, Department of Molecular Biology & Biochemistry Faculty of Sciences University of Málaga, SpainNelma Regina Segnini Bossolan, Instituto de Física de São Carlos, Universidade de São Paulo (USP, BrasilPaulo De Avila Junior, Centro de Ciências Naturais e Humanas (CCNH Universidade Federal do ABC (UFABC

  1. Team Orientations, Interpersonal Relations, and Team Success

    Science.gov (United States)

    Nixon, Howard L.

    1976-01-01

    Contradictions in post research on the concepts of "cohesiveness" and team success seem to arise from the ways in which cohesiveness is measured and the nature of the teams investigated in each study. (MB)

  2. Team cohesion and team success in sport.

    Science.gov (United States)

    Carron, Albert V; Bray, Steven R; Eys, Mark A

    2002-02-01

    The main aim of this study was to examine the relationship between task cohesiveness and team success in elite teams using composite team estimates of cohesion. A secondary aim was to determine statistically the consistency (i.e. 'groupness') present in team members' perceptions of cohesion. Elite university basketball teams (n = 18) and club soccer teams (n = 9) were assessed for cohesiveness and winning percentages. Measures were recorded towards the end of each team's competitive season. Our results indicate that cohesiveness is a shared perception, thereby providing statistical support for the use of composite team scores. Further analyses indicated a strong relationship between cohesion and success (r = 0.55-0.67). Further research using multi-level statistical techniques is recommended.

  3. Numerical simulations of MHD flow transition in ducts with conducting Hartmann walls. Limtech project A3 D4 (TUI)

    Energy Technology Data Exchange (ETDEWEB)

    Krasnov, D.; Boeck, T. [Technische Univ. Ilmenau (Germany). Inst. of Thermodynamics and Fluid Mechanics; Braiden, L.; Molokov, S. [Conventry Univ. (United Kingdom). Dept. of Mathematics and Physics; Buehler, L. [Karlsruher Institut fuer Technologie (Germany). Inst. fuer Kern- und Energietechnik, Programm Kernfusion

    2016-07-01

    Pressure-driven magnetohydrodynamic duct flows in a transverse, wall-parallel and uniform field have been studied by direct numerical. The conducting Hartmann walls give rise to a laminar velocity distribution with strong jets at the side walls, which are susceptible to flow instability. The onset of time-dependent flow as well as fully developed turbulent flow have been explored in a wide range of parameters.

  4. The Importance of Team Sex Composition in Team-Training Research Employing Complex Psychomotor Tasks.

    Science.gov (United States)

    Jarrett, Steven M; Glaze, Ryan M; Schurig, Ira; Arthur, Winfred

    2017-08-01

    The relationship between team sex composition and team performance on a complex psychomotor task was examined because these types of tasks are commonly used in the lab-based teams literature. Despite well-documented sex-based differences on complex psychomotor tasks, the preponderance of studies-mainly lab based-that use these tasks makes no mention of the sex composition of teams across or within experimental conditions. A sample of 123 four-person teams with varying team sex composition learned and performed a complex psychomotor task, Steal Beasts Pro PE. Each team completed a 5-hr protocol whereby they conducted several performance missions. The results indicated significant large mean differences such that teams with larger proportions of males had higher performance scores. These findings demonstrate the potential effect of team sex composition on the validity of studies that use complex psychomotor tasks to explore and investigate team performance-related phenomena when (a) team sex composition is not a focal variable of interest and (b) it is not accounted for or controlled. Given the proclivity of complex psychomotor action-based tasks used in lab-based team studies, it is important to understand and control for the impact of team sex composition on team performance. When team sex composition is not controlled for, either methodologically or statistically, it may affect the validity of the results in teams studies using these types of tasks.

  5. Extra-team connections for knowledge transfer between staff teams

    Science.gov (United States)

    Ramanadhan, Shoba; Wiecha, Jean L.; Emmons, Karen M.; Gortmaker, Steven L.; Viswanath, Kasisomayajula

    2009-01-01

    As organizations implement novel health promotion programs across multiple sites, they face great challenges related to knowledge management. Staff social networks may be a useful medium for transferring program-related knowledge in multi-site implementation efforts. To study this potential, we focused on the role of extra-team connections (ties between staff members based in different site teams) as potential channels for knowledge sharing. Data come from a cross-sectional study of afterschool childcare staff implementing a health promotion program at 20 urban sites of the Young Men's Christian Association of Greater Boston. We conducted a sociometric social network analysis and attempted a census of 91 program staff members. We surveyed 80 individuals, and included 73 coordinators and general staff, who lead and support implementation, respectively, in this study. A multiple linear regression model demonstrated a positive relationship between extra-team connections (β = 3.41, P knowledge transfer. We also found that intra-team connections (within-team ties between staff members) were also positively related to skill receipt. Connections between teams appear to support knowledge transfer in this network, but likely require greater active facilitation, perhaps via organizational changes. Further research on extra-team connections and knowledge transfer in low-resource, high turnover environments is needed. PMID:19528313

  6. Pedagogical innovation in teacher teams

    DEFF Research Database (Denmark)

    Weitze, Charlotte Lærke

    2015-01-01

    This paper presents findings from a longitudinal design-based research project examining how to enable reflection and pedagogical innovation in teacher teams. The article identifies and analyses the teachers’ learning trajectories and innovative strategies when working together in the IT...... learning designs, the research aims to clarify what kind of knowledge is being developed and shared in the teacher teams, and how this contributes to the organisational learning process. The context is Global Classroom, an innovative synchronous hybrid videoconference concept, where adult students can......-pedagogical Think Tank for Teacher Teams (after this: ITP4T) (Weitze, 2014a), a competence development model, which was developed in an earlier phase of the research project. By using theoretical lenses from innovative knowledge development frameworks to examine the teachers’ utterances, interactions and new...

  7. Projection-reduction method applied to deriving non-linear optical conductivity for an electron-impurity system

    Directory of Open Access Journals (Sweden)

    Nam Lyong Kang

    2013-07-01

    Full Text Available The projection-reduction method introduced by the present authors is known to give a validated theory for optical transitions in the systems of electrons interacting with phonons. In this work, using this method, we derive the linear and first order nonlinear optical conductivites for an electron-impurity system and examine whether the expressions faithfully satisfy the quantum mechanical philosophy, in the same way as for the electron-phonon systems. The result shows that the Fermi distribution function for electrons, energy denominators, and electron-impurity coupling factors are contained properly in organized manners along with absorption of photons for each electron transition process in the final expressions. Furthermore, the result is shown to be represented properly by schematic diagrams, as in the formulation of electron-phonon interaction. Therefore, in conclusion, we claim that this method can be applied in modeling optical transitions of electrons interacting with both impurities and phonons.

  8. Your cancer care team

    Science.gov (United States)

    ... gov/ency/patientinstructions/000929.htm Your cancer care team To use the sharing features on this page, ... help your body heal. Working with Your Care Team Each member of your care team plays an ...

  9. Large scale permeability test of the granite in the stipa mine and thermal conductivity test. Technical project report No. 2

    International Nuclear Information System (INIS)

    Lundstroem, L.; Stills, H.

    1978-03-01

    The investigated properties of the granite bedrock at Stripa may be summarized as follows: The permeability is very low, 0.4 x 10 -10 m/s, and independent of the pressure gradient. The permeability is reduced by 50 percent at a temperature increase from +10 0 C to +35 0 C. The thermal conductivity was determined in situ to be about 4 W/m 0 C which largely agrees with laboratory determinations. The effective porosity was determined to be 0.012 percent. 12 figs

  10. Thermal Conductivity of Metallic Uranium

    Energy Technology Data Exchange (ETDEWEB)

    Hin, Celine

    2018-03-10

    This project has developed a modeling and simulation approaches to predict the thermal conductivity of metallic fuels and their alloys. We focus on two methods. The first method has been developed by the team at the University of Wisconsin Madison. They developed a practical and general modeling approach for thermal conductivity of metals and metal alloys that integrates ab-initio and semi-empirical physics-based models to maximize the strengths of both techniques. The second method has been developed by the team at Virginia Tech. This approach consists of a determining the thermal conductivity using only ab-initio methods without any fitting parameters. Both methods were complementary. The models incorporated both phonon and electron contributions. Good agreement with experimental data over a wide temperature range were found. The models also provided insight into the different physical factors that govern the thermal conductivity under different temperatures. The models were general enough to incorporate more complex effects like additional alloying species, defects, transmutation products and noble gas bubbles to predict the behavior of complex metallic alloys like U-alloy fuel systems under burnup. 3 Introduction Thermal conductivity is an important thermal physical property affecting the performance and efficiency of metallic fuels [1]. Some experimental measurement of thermal conductivity and its correlation with composition and temperature from empirical fitting are available for U, Zr and their alloys with Pu and other minor actinides. However, as reviewed in by Kim, Cho and Sohn [2], due to the difficulty in doing experiments on actinide materials, thermal conductivities of metallic fuels have only been measured at limited alloy compositions and temperatures, some of them even being negative and unphysical. Furthermore, the correlations developed so far are empirical in nature and may not be accurate when used for prediction at conditions far from those

  11. Team Foundation Server 2013 customization

    CERN Document Server

    Beeming, Gordon

    2014-01-01

    This book utilizes a tutorial based approach, focused on the practical customization of key features of the Team Foundation Server for collaborative enterprise software projects.This practical guide is intended for those who want to extend TFS. This book is for intermediate users who have an understanding of TFS, and basic coding skills will be required for the more complex customizations.

  12. A Phenomenological Study of Teamwork in Online and Face-to-Face Student Teams

    Science.gov (United States)

    Saghafian, Marzieh; O'Neill, D. Kevin

    2018-01-01

    Team-based projects are widely used in both traditional face-to-face and online programs in higher education. To date, the teamwork experiences of students in each modality have been documented primarily through evaluative research conducted over short spans of time and limited by a priori frameworks. The literature also reflects a lack of…

  13. Characteristics of the safety climate in teams with world-class safety ...

    African Journals Online (AJOL)

    Accidents and incidents in the construction environment are not reduced or eliminated effectively, despite numerous efforts made to improve health and safety in the industry. An extensive field of research has been conducted on how teams in the construction environment interact to deliver a project successfully in terms of ...

  14. Hospital-based child protection teams that care for parents who abuse or neglect their children recognize the need for multidisciplinary collaborative practice involving perinatal care and mental health professionals: a questionnaire survey conducted in Japan

    Directory of Open Access Journals (Sweden)

    Okato A

    2018-02-01

    Full Text Available Ayumi Okato,1 Tasuku Hashimoto,1 Mami Tanaka,2 Masumi Tachibana,1 Akira Machizawa,3 Jun Okayama,4 Mamiko Endo,5 Masayoshi Senda,6,7 Naoki Saito,5,7 Masaomi Iyo1 1Department of Psychiatry, Graduate School of Medicine, Chiba University, 2Division of Clinical Study on Juvenile Delinquency, Center for Forensic Mental Health, Chiba University, 3Department of Psychiatry, Chiba University Hospital, 4Department of Reproductive Medicine, Graduate School of Medicine, Chiba University, 5Department of Pediatrics, Graduate School of Medicine, Chiba University, 6Department of Pediatrics, Asahi General Hospital, 7Division of Clinical Forensic Medicine, Education and Research Center of Legal Medicine, Chiba University, Chiba, Japan Background: Child abuse and/or neglect is a serious issue, and in many cases, parents are the perpetrators. Hospital-based child protection teams (CPTs play pivotal roles in the management of not only abused and/or neglected children but also of their parents; this is generally conducted through multidisciplinary practice. The aim of this study is to survey hospital-based CPT members to determine the professions they perceive to be most applicable to participation in CPTs. Participants and methods: The participants were members of CPTs affiliated with hospitals that had pediatric emergency departments and which were located in Chiba Prefecture; specifically, 114 CPT members from 23 hospitals responded to this survey. The two main questionnaire items concerned are as follows: 1 each respondent’s evaluation of conducting assessments, providing support, and implementing multidisciplinary collaborative practice in the treatment of abusive and negligent parents, and 2 each CPT member’s opinion on the professions that are most important for CPT activities. An exploratory factor analysis (EFA was performed to explore the factor structure of the data, and a correlation analysis was performed using the result obtained. Results: The EFA

  15. The standard system for conducting the TNA (Training Needs Analysis) of Staff (delrapport fra EU Erasmus+ project SMART

    DEFF Research Database (Denmark)

    Jensen, Ulla Højmark

    2016-01-01

    The Training Needs Analysis (TNA) has been carried out with the staff of the partner organisations. A standard system for conducting a quantitative and a qualitative training needs analysis had been developed and it has been used as a framework for the analysis from the 4 partners: Limerick...... Youthreach in Ireland, Copenhagen Youth school in Denmark, Esbjerg Youth school in Denmark and Palermo, CESIE in Italy. Due to the different experience level among staff and the different national and local regulations and the school contexts; the four partners have made their individual version...... and translation of the standardised system to suit their own individual context. Limerick and Palermo have completed both a quantitative and a qualitative training needs analyses. Copenhagen and Esbjerg have completed a qualitative training needs analysis. This report summarises the findings of the four partners...

  16. Horizontal coring using air as the circulating fluid: Some prototype studies conducted in G Tunnel at the Nevada Test Site for the Yucca Mountain Project

    International Nuclear Information System (INIS)

    Chornack, M.P.; French, C.A.

    1989-01-01

    Horizontal coring using air as the circulating fluid has been conducted in the G Tunnel Underground Facility (GTUF) at the Nevada Test Site. This work is part of the prototype investigations of hydrogeology for the Yucca Mountain Project. The work is being conducted to develop methods and procedures that will be used at the Department of Energy's Yucca Mountain Site, a candidate site for the nation's first high-level nuclear waste repository, during the site characterization phase of the investigations. The United States Geological Survey (USGS) is conducting this prototype testing under the guidance of the Los Alamos National Laboratory (LANL) and in conjunction with Reynolds Electrical ampersand Engineering Company (REECo), the drilling contractor. 7 refs., 8 figs., 5 tabs

  17. Bringing Students out of the Classroom and into Research Projects: An Undergraduate Team Research (UTR) Program at the University of Southern California

    Science.gov (United States)

    Cox, I. V.; Quirk, M.; Culbert, K. N.; Whitesides, A. S.; Sun, H.; Black, C. J.; Cao, W.; Zhang, T.; Paterson, S. R.; Memeti, V.; Anderson, J. L.

    2010-12-01

    In 2006, USC Earth Sciences professors Paterson and Anderson created the Undergraduate Team Research (UTR) program, a year-long, multidisciplinary, learner-centered, student research experience. This program is open to all USC undergraduate students, but has also involved a few outstanding undergraduate students from other universities. Since its inception the 47 participants have been a diverse group: 53% women, ~17% minorities, and 43% non-Earth Science majors. To date, 15 abstracts written by UTR participants have been presented at national GSA and AGU meetings and several research papers for publication are in preparation. 12 presentations have been produced at University-sponsored research symposia and culminated in a number of senior theses. The central component of this program is a field-based research experience which involves several weeks of geologic mapping in various locations around the world. During the summer expedition, participants organize themselves into 3-4 person mapping teams consisting of a mix of undergraduate geology majors, non-majors, and mentors (professors and graduate students). At the end of each day, student researchers (with limited mentoring) work together to draft a geologic map while discussing their findings, formulating hypotheses about possible geologic histories, and planning research goals and organizing mapping teams for the next day. Throughout the following academic year, the student researchers continue to work in teams to digitize their geologic map, decide which analyses need to be done, and prepare collected rock samples for various structural, geochemical, and geochronologic studies. Most student researchers agree that they learned more in a few weeks than they often did in an entire semester course. What aspects of the UTR program elicit these high-yield results, even for non-majors that can be applied to other learning environments? We speculate that three critical elements are important: (1) The most notable is

  18. Operational challenges in conducting a community-based technology-enabled mental health services delivery model for rural India: Experiences from the SMART Mental Health Project.

    Science.gov (United States)

    Maulik, Pallab K; Kallakuri, Sudha; Devarapalli, Siddhardha

    2018-01-01

    Background: There are large gaps in the delivery of mental health care in low- and middle-income countries such as India, and the problems are even more acute in rural settings due to lack of resources, remoteness, and lack of infrastructure, amongst other factors. The Systematic Medical Appraisal Referral and Treatment (SMART) Mental Health Project was conceived as a mental health services delivery model using technology-based solutions for rural India. This paper reports on the operational strategies used to facilitate the implementation of the intervention. Method: Key components of the SMART Mental Health Project included delivering an anti-stigma campaign, training of primary health workers in screening, diagnosing and managing stress, depression and increased suicide risk and task sharing of responsibilities in delivering care; and using mobile technology based electronic decision support systems to support delivery of algorithm based care for such disorders. The intervention was conducted in 42 villages across two sites in the state of Andhra Pradesh in south India. A pre-post mixed methods evaluation was done, and in this paper operational challenges are reported. Results: Both quantitative and qualitative results from the evaluation from one site covering about 5000 adults showed that the intervention was feasible and acceptable, and initial results indicated that it was beneficial in increasing access to mental health care and reducing depression and anxiety symptoms. A number of strategies were initiated in response to operational challenges to ensure smoother conduct of the project and facilitated the project to be delivered as envisaged. Conclusions: The operational strategies initiated for this project were successful in ensuring the delivery of the intervention. Those, coupled with other more systematic processes have informed the researchers to understand key processes that need to be in place to develop a more robust study, that could eventually be

  19. Team Learning in Teacher Teams: Team Entitativity as a Bridge between Teams-in-Theory and Teams-in-Practice

    Science.gov (United States)

    Vangrieken, Katrien; Dochy, Filip; Raes, Elisabeth

    2016-01-01

    This study aimed to investigate team learning in the context of teacher teams in higher vocational education. As teacher teams often do not meet all criteria included in theoretical team definitions, the construct "team entitativity" was introduced. Defined as the degree to which a group of individuals possesses the quality of being a…

  20. Conducting rigorous research with subgroups of at-risk youth: lessons learned from a teen pregnancy prevention project in Alaska

    Directory of Open Access Journals (Sweden)

    Kathryn Hohman-Billmeier

    2016-12-01

    Full Text Available In 2010, Alaska Department of Health and Social Services (DHSS received federal funding to test an evidence-based teen pregnancy prevention program. The grant required a major modification to an existing program and a randomized control trial (RCT to test its effectiveness. As the major modifications, Alaska used peer educators instead of adults to deliver the program to youth aged 14–19 instead of the original curriculum intended age range of 12–14. Cultural and approach adaptations were included as well. After 4 years of implementation and data collection, the sample was too small to provide statistically significant results. The lack of findings gave no information about the modification, nor any explanation of how the curriculum was received, or reasons for the small sample. This paper reports on a case study follow-up to the RCT to better understand outcome and implementation results. For this study, researchers reviewed project documents and interviewed peer educators, state and local staff, and evaluators. Three themes emerged from the data: (a the professional growth of peer educators and development of peer education, (b difficulties resulting from curriculum content, especially for subpopulations of sexually active youth, youth identified as lesbian, gay, bisexual, transgender, queer, intersex and/or asexual, pregnant, and parenting youth and (c the appropriateness of an RCT with subpopulations of at-risk youth. Three recommendations emerged from the case study. First, including as many stakeholders as possible in the program and evaluation design phases is essential, and must be supported by appropriate funding streams and training. Second, there must be recognition of the multiple small subpopulations found in Alaska when adapting programs designed for a larger and more homogeneous population. Third, RCTs may not be appropriate for all population subgroups.

  1. Conducting rigorous research with subgroups of at-risk youth: lessons learned from a teen pregnancy prevention project in Alaska.

    Science.gov (United States)

    Hohman-Billmeier, Kathryn; Nye, Margaret; Martin, Stephanie

    2016-01-01

    In 2010, Alaska Department of Health and Social Services (DHSS) received federal funding to test an evidence-based teen pregnancy prevention program. The grant required a major modification to an existing program and a randomized control trial (RCT) to test its effectiveness. As the major modifications, Alaska used peer educators instead of adults to deliver the program to youth aged 14-19 instead of the original curriculum intended age range of 12-14. Cultural and approach adaptations were included as well. After 4 years of implementation and data collection, the sample was too small to provide statistically significant results. The lack of findings gave no information about the modification, nor any explanation of how the curriculum was received, or reasons for the small sample. This paper reports on a case study follow-up to the RCT to better understand outcome and implementation results. For this study, researchers reviewed project documents and interviewed peer educators, state and local staff, and evaluators. Three themes emerged from the data: (a) the professional growth of peer educators and development of peer education, (b) difficulties resulting from curriculum content, especially for subpopulations of sexually active youth, youth identified as lesbian, gay, bisexual, transgender, queer, intersex and/or asexual, pregnant, and parenting youth and (c) the appropriateness of an RCT with subpopulations of at-risk youth. Three recommendations emerged from the case study. First, including as many stakeholders as possible in the program and evaluation design phases is essential, and must be supported by appropriate funding streams and training. Second, there must be recognition of the multiple small subpopulations found in Alaska when adapting programs designed for a larger and more homogeneous population. Third, RCTs may not be appropriate for all population subgroups.

  2. Factors associated with continuance commitment to FAA matrix teams.

    Science.gov (United States)

    1993-11-01

    Several organizations within the FAA employ matrix teams to achieve cross-functional coordination. Matrix team members typically represent different organizational functions required for project accomplishment (e.g., research and development, enginee...

  3. Pioneering the Transdisciplinary Team Science Approach: Lessons Learned from National Cancer Institute Grantees.

    Science.gov (United States)

    Vogel, Amanda L; Stipelman, Brooke A; Hall, Kara L; Nebeling, Linda; Stokols, Daniel; Spruijt-Metz, Donna

    2014-01-01

    The National Cancer Institute has been a leader in supporting transdisciplinary (TD) team science. From 2005-2010, the NCI supported Transdisciplinary Research on Energetic and Cancer I (TREC I), a center initiative fostering the TD integration of social, behavioral, and biological sciences to examine the relationships among obesity, nutrition, physical activity and cancer. In the final year of TREC I, we conducted qualitative in-depth-interviews with 31 participating investigators and trainees to learn more about their experiences with TD team science, including challenges, facilitating factors, strategies for success, and impacts. Five main challenges emerged: (1) limited published guidance for how to engage in TD team science, when TREC I was implemented; (2) conceptual and scientific challenges inherent to efforts to achieve TD integration; (3) discipline-based differences in values, terminology, methods, and work styles; (4) project management challenges involved in TD team science; and (5) traditional incentive and reward systems that do not recognize or reward TD team science. Four main facilitating factors and strategies for success emerged: (1) beneficial attitudes and beliefs about TD research and team science; (2) effective team processes; (3) brokering and bridge-building activities by individuals holding particular roles in a research center; and (4) funding initiative characteristics that support TD team science. Broad impacts of participating in TD team science in the context of TREC I included: (1) new positive attitudes about TD research and team science; (2) new boundary-crossing collaborations; (3) scientific advances related to research approaches, findings, and dissemination; (4) institutional culture change and resource creation in support of TD team science; and (5) career advancement. Funding agencies, academic institutions, and scholarly journals can help to foster TD team science through funding opportunities, institutional policies on

  4. Leader evaluation and team cohesiveness in the process of team development: A matter of gender?

    Directory of Open Access Journals (Sweden)

    Núria Rovira-Asenjo

    Full Text Available Leadership positions are still stereotyped as masculine, especially in male-dominated fields (e.g., engineering. So how do gender stereotypes affect the evaluation of leaders and team cohesiveness in the process of team development? In our study participants worked in 45 small teams (4-5 members. Each team was headed by either a female or male leader, so that 45 leaders (33% women supervised 258 team members (39% women. Over a period of nine months, the teams developed specific engineering projects as part of their professional undergraduate training. We examined leaders' self-evaluation, their evaluation by team members, and team cohesiveness at two points of time (month three and month nine, the final month of the collaboration. While we did not find any gender differences in leaders' self-evaluation at the beginning, female leaders evaluated themselves more favorably than men at the end of the projects. Moreover, female leaders were evaluated more favorably than male leaders at the beginning of the project, but the evaluation by team members did not differ at the end of the projects. Finally, we found a tendency for female leaders to build more cohesive teams than male leaders.

  5. Leader evaluation and team cohesiveness in the process of team development: A matter of gender?

    Science.gov (United States)

    Sczesny, Sabine; Gumí, Tània; Guimerà, Roger; Sales-Pardo, Marta

    2017-01-01

    Leadership positions are still stereotyped as masculine, especially in male-dominated fields (e.g., engineering). So how do gender stereotypes affect the evaluation of leaders and team cohesiveness in the process of team development? In our study participants worked in 45 small teams (4–5 members). Each team was headed by either a female or male leader, so that 45 leaders (33% women) supervised 258 team members (39% women). Over a period of nine months, the teams developed specific engineering projects as part of their professional undergraduate training. We examined leaders’ self-evaluation, their evaluation by team members, and team cohesiveness at two points of time (month three and month nine, the final month of the collaboration). While we did not find any gender differences in leaders’ self-evaluation at the beginning, female leaders evaluated themselves more favorably than men at the end of the projects. Moreover, female leaders were evaluated more favorably than male leaders at the beginning of the project, but the evaluation by team members did not differ at the end of the projects. Finally, we found a tendency for female leaders to build more cohesive teams than male leaders. PMID:29059231

  6. Teaming. The Key to World Class Manufacturing.

    Science.gov (United States)

    Wright, John R.

    1999-01-01

    Lean manufacturing, a streamlined system of flow and job shop techniques, relies on self-directed work teams. Technology educators can prepare students for work in this environment by using problem-solving teams in the classroom to work on design briefs and other group projects. (SK)

  7. Enhancing Mathematical Communication for Virtual Math Teams

    Science.gov (United States)

    Stahl, Gerry; Çakir, Murat Perit; Weimar, Stephen; Weusijana, Baba Kofi; Ou, Jimmy Xiantong

    2010-01-01

    The Math Forum is an online resource center for pre-algebra, algebra, geometry and pre-calculus. Its Virtual Math Teams (VMT) service provides an integrated web-based environment for small teams of people to discuss math and to work collaboratively on math problems or explore interesting mathematical micro-worlds together. The VMT Project studies…

  8. Effects of Individual Success on Globally Distributed Team Performance

    OpenAIRE

    Yılmaz, Onur

    2013-01-01

    Necessity of different competencies with high level of knowledge makes it inevitable that software development is a team work. With the today's technology, teams can communicate both synchronously and asynchronously using different online collaboration tools throughout the world. Researches indicate that there are many factors that affect the team success and in this paper, effect of individual success on globally distributed team performance will be analyzed. Student team projects undertaken...

  9. Speeding Up Team Learning.

    Science.gov (United States)

    Edmondson, Amy; Bohmer, Richard; Pisano, Gary

    2001-01-01

    A study of 16 cardiac surgery teams looked at how the teams adapted to new ways of working. The challenge of team management is to implement new processes as quickly as possible. Steps for creating a learning team include selecting a mix of skills and expertise, framing the challenge, and creating an environment of psychological safety. (JOW)

  10. NASA's Rodent Research Project: Validation of Flight Hardware, Operations and Science Capabilities for Conducting Long Duration Experiments in Space

    Science.gov (United States)

    Choi, S. Y.; Beegle, J. E.; Wigley, C. L.; Pletcher, D.; Globus, R. K.

    2015-01-01

    Research using rodents is an essential tool for advancing biomedical research on Earth and in space. Rodent Research (RR)-1 was conducted to validate flight hardware, operations, and science capabilities that were developed at the NASA Ames Research Center. Twenty C57BL/6J adult female mice were launched on Sept 21, 2014 in a Dragon Capsule (SpaceX-4), then transferred to the ISS for a total time of 21-22 days (10 commercial mice) or 37 (10 validation mice). Tissues collected on-orbit were either rapidly frozen or preserved in RNA later at less than or equal to -80 C (n=2/group) until their return to Earth. Remaining carcasses were rapidly frozen for dissection post-flight. The three controls groups at Kennedy Space Center consisted of: Basal mice euthanized at the time of launch, Vivarium controls, housed in standard cages, and Ground Controls (GC), housed in flight hardware within an environmental chamber. FLT mice appeared more physically active on-orbit than GC, and behavior analysis are in progress. Upon return to Earth, there were no differences in body weights between FLT and GC at the end of the 37 days in space. RNA was of high quality (RIN greater than 8.5). Liver enzyme activity levels of FLT mice and all control mice were similar in magnitude to those of the samples that were optimally processed in the laboratory. Liver samples collected from the intact frozen FLT carcasses had RNA RIN of 7.27 +/- 0.52, which was lower than that of the samples processed on-orbit, but similar to those obtained from the control group intact carcasses. Nonetheless, the RNA samples from the intact carcasses were acceptable for the most demanding transcriptomic analyses. Adrenal glands, thymus and spleen (organs associated with stress response) showed no significant difference in weights between FLT and GC. Enzymatic activity was also not significantly different. Over 3,000 tissues collected from the four groups of mice have become available for the Biospecimen Sharing

  11. The Effect of an Interdisciplinary Community Health Project on Student Attitudes toward Community Health, People Who Are Indigent and Homeless, and Team Leadership Skill Development.

    Science.gov (United States)

    Rose, Molly A.; Lyons, Kevin J.; Miller, Kathleen Swenson; Cornman-Levy, Diane

    2003-01-01

    A study of 22 health occupations students examined whether participation in an interdisciplinary community health empowerment project with urban homeless and formerly homeless people changed their attitudes about community health practice, attitudes toward people who are indigent and homeless, and perceived leadership skills. Posttests revealed a…

  12. ANL CP-5 decontamination and decommissioning project necessary and sufficient pilot. Report of the standards identification team on the selection of the necessary and sufficient standards set

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    The CP-5 reactor was a heavy-water moderated and cooled, highly-enriched uranium-fueled thermal reactor designed for supplying neutrons for research. The reactor was operated almost continuously for 25 years until its final shutdown in 1979. It is situated on approximately three acres in the southwestern section of Argonne National Laboratory. In 1980, all nuclear fuel and the heavy water that could be drained from the process systems were shipped off-site, and the CP-5 facility was placed into lay-up pending funding for decommissioning. It was maintained in the lay-up condition with a minimum of maintenance until 1990, when the decontamination and decommissioning (D and D) project began. This D and D project provides for the disassembly and removal of all radioactive components, equipment, and structures that are associated with the CP-5 facility. The experimental area around the CP-5 reactor has been prepared for D and D, and the area outside the facility has been remediated. The reactor primary coolant and support systems have been removed and packaged as waste. The significant remaining tasks are (1) removal of the reactor internals and the biological shield structure; (2) decontamination of the rod storage area; (3) decontamination of the various radioactive material storage and handling facilities, including the fuel pool; and (4) decontamination and dismantlement of the building. This report describes the scope of the project, identification of standards for various aspects of the project, the lessons learned, and consideration for implementation.

  13. An international peer review of the biosphere modelling programme of the US Department of Energy's Yucca mountain site characterization project. Report of the IAEA International Review Team

    International Nuclear Information System (INIS)

    2001-04-01

    The United States Department of Energy (DOE) has a project for characterizing the site of a facility for disposing of radioactive waste located at Yucca Mountain Nevada, USA (the Yucca Mountain Site Characterization Project). This Project has developed an approach for assessing the future potential impact of any releases of radionuclides to the biosphere from a potential disposal facility sited at Yucca Mountain The DOE requested the International Atomic Energy Agency (IAEA) to organize an independent international expert review of the assessment methodology being used in its biosphere modelling programme. The IAEA accepted the request in the context of its statutory obligation to provide for the application of its established international standards of safety for the protection of health, at the request of a State, to any of that State's activities in the field of atomic energy. The terms of reference of the peer review were to review the biosphere assessment methodology being used for the total system performance assessment of the potential disposal facility. The main purpose was to analyze critically the proposed rationale and methodology and to identify consistencies and inconsistencies between methods being used in the frame of the Project and those established in international standards or in international programmes such as the IAEA's Biosphere Modelling and Assessment Programme (BIOMASS). This report presents the consensus view of the international experts convened by the IAEA for carrying out the review

  14. ANL CP-5 decontamination and decommissioning project necessary and sufficient pilot. Report of the standards identification team on the selection of the necessary and sufficient standards set

    International Nuclear Information System (INIS)

    1996-05-01

    The CP-5 reactor was a heavy-water moderated and cooled, highly-enriched uranium-fueled thermal reactor designed for supplying neutrons for research. The reactor was operated almost continuously for 25 years until its final shutdown in 1979. It is situated on approximately three acres in the southwestern section of Argonne National Laboratory. In 1980, all nuclear fuel and the heavy water that could be drained from the process systems were shipped off-site, and the CP-5 facility was placed into lay-up pending funding for decommissioning. It was maintained in the lay-up condition with a minimum of maintenance until 1990, when the decontamination and decommissioning (D and D) project began. This D and D project provides for the disassembly and removal of all radioactive components, equipment, and structures that are associated with the CP-5 facility. The experimental area around the CP-5 reactor has been prepared for D and D, and the area outside the facility has been remediated. The reactor primary coolant and support systems have been removed and packaged as waste. The significant remaining tasks are (1) removal of the reactor internals and the biological shield structure; (2) decontamination of the rod storage area; (3) decontamination of the various radioactive material storage and handling facilities, including the fuel pool; and (4) decontamination and dismantlement of the building. This report describes the scope of the project, identification of standards for various aspects of the project, the lessons learned, and consideration for implementation

  15. Task versus relationship conflict, team performance, and team member satisfaction: a meta-analysis.

    Science.gov (United States)

    De Dreu, Carsten K W; Weingart, Laurie R

    2003-08-01

    This study provides a meta-analysis of research on the associations between relationship conflict, task conflict, team performance, and team member satisfaction. Consistent with past theorizing, results revealed strong and negative correlations between relationship conflict, team performance, and team member satisfaction. In contrast to what has been suggested in both academic research and introductory textbooks, however, results also revealed strong and negative (instead of the predicted positive) correlations between task conflict team performance, and team member satisfaction. As predicted, conflict had stronger negative relations with team performance in highly complex (decision making, project, mixed) than in less complex (production) tasks. Finally, task conflict was less negatively related to team performance when task conflict and relationship conflict were weakly, rather than strongly, correlated.

  16. Professional Team Foundation Server 2012

    CERN Document Server

    Blankenship, Ed; Holliday, Grant; Keller, Brian

    2012-01-01

    A comprehensive guide to using Microsoft Team Foundation Server 2012 Team Foundation Server has become the leading Microsoft productivity tool for software management, and this book covers what developers need to know to use it effectively. Fully revised for the new features of TFS 2012, it provides developers and software project managers with step-by-step instructions and even assists those who are studying for the TFS 2012 certification exam. You'll find a broad overview of TFS, thorough coverage of core functions, a look at extensibility options, and more, written by Microsoft ins

  17. Team Leader Structuring for Team Effectiveness and Team Learning in Command-and-Control Teams

    Science.gov (United States)

    van der Haar, Selma; Koeslag-Kreunen, Mieke; Euwe, Eline; Segers, Mien

    2017-01-01

    Due to their crucial and highly consequential task, it is of utmost importance to understand the levers leading to effectiveness of multidisciplinary emergency management command-and-control (EMCC) teams. We argue that the formal EMCC team leader needs to initiate structure in the team meetings to support organizing the work as well as facilitate team learning, especially the team learning process of constructive conflict. In a sample of 17 EMCC teams performing a realistic EMCC exercise, including one or two team meetings (28 in sum), we coded the team leader’s verbal structuring behaviors (1,704 events), rated constructive conflict by external experts, and rated team effectiveness by field experts. Results show that leaders of effective teams use structuring behaviors more often (except asking procedural questions) but decreasingly over time. They support constructive conflict by clarifying and by making summaries that conclude in a command or decision in a decreasing frequency over time. PMID:28490856

  18. Team Leader Structuring for Team Effectiveness and Team Learning in Command-and-Control Teams.

    Science.gov (United States)

    van der Haar, Selma; Koeslag-Kreunen, Mieke; Euwe, Eline; Segers, Mien

    2017-04-01

    Due to their crucial and highly consequential task, it is of utmost importance to understand the levers leading to effectiveness of multidisciplinary emergency management command-and-control (EMCC) teams. We argue that the formal EMCC team leader needs to initiate structure in the team meetings to support organizing the work as well as facilitate team learning, especially the team learning process of constructive conflict. In a sample of 17 EMCC teams performing a realistic EMCC exercise, including one or two team meetings (28 in sum), we coded the team leader's verbal structuring behaviors (1,704 events), rated constructive conflict by external experts, and rated team effectiveness by field experts. Results show that leaders of effective teams use structuring behaviors more often (except asking procedural questions) but decreasingly over time. They support constructive conflict by clarifying and by making summaries that conclude in a command or decision in a decreasing frequency over time.

  19. Trust in Diverse Teams

    DEFF Research Database (Denmark)

    Clausen, Lisbeth

    , maintaining team cohesiveness in multicultural teams to collaborate effectively presents a number of challenges. The present study employs the concept of trust to explore influences on team collaboration in high performing teams. The study is based on observation of teams in seven multinational corporations...... and interviews with managers from the US, Europe, China and Japan. The study presents a conceptual framework - a ‘trust buffer’ – which enables analysis and exemplification of the dynamics and challenges of teams as drivers of change. Each team has strategically important tasks, unique capacities and deal...... with change in particular ways: Each team is analyzed in relation to its global (HQ) mandate, local (national) stakeholders and organizational context. It is found that communication energy, resources and team mandate underscore the sense of trust in high performing teams. Diversity is understood...

  20. Tiger Team Assessment of the Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    1991-11-01

    This report documents the Tiger Team Assessment of the Los Alamos National Laboratory (LANL) located in Los Alamos, New Mexico. LANL is operated for the US Department of Energy (DOE) by the University of California. The Tiger Team Assessment was conducted from September 23 to November 8, 1991, under the auspices of the DOE Office of Special Projects, Office of Assistant Secretary for Environment, Safety and Health. The assessment was comprehensive, encompassing environmental, safety, and health (ES ampersand H) disciplines; management; and contractor and DOE self-assessments. Compliance with applicable Federal, state, and local regulations; applicable DOE Orders; best management practices; and internal LANL site requirements was assessed. In addition, an evaluation of the adequacy and effectiveness of the DOE and the site contractors' management of ES ampersand H/quality assurance programs was conducted. This volume discusses findings concerning the environmental assessment

  1. Tiger Team Assessment of the Naval Petroleum Reserves in California

    International Nuclear Information System (INIS)

    1991-12-01

    This report documents the Tiger Team Assessment of the Naval Petroleum Reserves in California (NPRC) which consists of Naval Petroleum Reserve Number 1 (NPR-1), referred to as the Elk Hills oil field and Naval Petroleum Reserve Number 2 (NPR-2), referred to as the Buena Vista oil field, each located near Bakersfield, California. The Tiger Team Assessment was conducted from November 12 to December 13, 1991, under the auspices of DOE's Office of Special Projects (OSP) under the Assistant Secretary for Environment, Safety and Health (EH). The assessment was comprehensive, encompassing environmental, safety, and health (ES ampersand H), and quality assurance (OA) disciplines; site remediation; facilities management; and waste management operations. Compliance with applicable Federal, State of California, and local regulations; applicable DOE Orders; best management practices; and internal NPRC requirements was assessed. In addition, an evaluation of the adequacy and effectiveness of DOE/NPRC, CUSA, and BPOI management of the ES ampersand H/QA programs was conducted

  2. The impact of team characteristics and context on team communication: An integrative literature review.

    Science.gov (United States)

    Tiferes, Judith; Bisantz, Ann M

    2018-04-01

    Many studies on teams report measures of team communication; however, these studies vary widely in terms of the team characteristics, situations, and tasks studied making it difficult to understand impacts on team communication more generally. The objective of this review is systematically summarize relationships between measures of team communication and team characteristics and situational contexts. A literature review was conducted searching in four electronic databases (PsycINFO, MEDLINE, Ergonomics Abstracts, and SocINDEX). Additional studies were identified by cross-referencing. Articles included for final review had reported at least one team communication measure associated with some team and/or context dimension. Ninety-nine of 727 articles met the inclusion criteria. Data extracted from articles included characteristics of the studies and teams and the nature of each of the reported team and/or context dimensions-team communication properties relationships. Some dimensions (job role, situational stressors, training strategies, cognitive artifacts, and communication media) were found to be consistently linked to changes in team communication. A synthesized diagram that describes the possible associations between eleven team and context dimensions and nine team communication measures is provided along with research needs. Copyright © 2017 Elsevier Ltd. All rights reserved.

  3. Team CANDU : ready for the marketplace

    International Nuclear Information System (INIS)

    Howieson, J.Q.

    2007-01-01

    This paper outlines the partnership between AECL and a number of leading global nuclear suppliers to market the Candu power reactor. The mission of the CANDU team is to develop market opportunities for CANDU technology and deliver successful CANDU projects

  4. Prioritising Project Scope Definition Elements in Public Building Projects

    Directory of Open Access Journals (Sweden)

    Mohammed K Fageha

    2014-09-01

    Full Text Available A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI as a basis, the study uses analytical network process (ANP technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage. Keywords: Project scope definition, pre-project planning, prioritising, public building projects, Saudi Arabia, Analytical Network Process (ANP

  5. Using teaching resources to help students develop team and project skills pays off, both in terms of employability and shorter study time

    DEFF Research Database (Denmark)

    Jensen, Lars Peter

    Since Aalborg University in Denmark was started in 1974 it has been using a special educational model, where Problem Based Learning is the turning point. Each semester the students on the Engineering Educations form groups of approximately 6 persons, which uses half of the study time within...... of the university many students had difficulties with practical issues such as collaboration, communication, and project management. An important aspect of the basic part of the education (first year), has therefore been the development of a course where the students gets tools and tricks for good communication...... report documenting the results of their project, but also an analysis of the working process getting there. Since year 1998 the teachers giving the CLP course have focused very much on these process analyses and as they are a part of the examination the students also have focused more on how they work...

  6. Using teaching resources to help students develop team and project skills pays off, both in terms of employability and shorter study time

    DEFF Research Database (Denmark)

    Jensen, Lars Peter

    2005-01-01

    Since Aalborg University in Denmark was started in 1974 it has been using a special educational model, where Problem Based Learning is the turning point. Each semester the students on the Engineering Educations form groups of approximately 6 persons, which uses half of the study time within...... of the university many students had difficulties with practical issues such as collaboration, communication, and project management. An important aspect of the basic part of the education (first year), has therefore been the development of a course where the students gets tools and tricks for good communication...... report documenting the results of their project, but also an analysis of the working process getting there. Since year 1998 the teachers giving the CLP course have focused very much on these process analyses and as they are a part of the examination the students also have focused more on how they work...

  7. Complex Problem Solving in Teams: The Impact of Collective Orientation on Team Process Demands

    Science.gov (United States)

    Hagemann, Vera; Kluge, Annette

    2017-01-01

    Complex problem solving is challenging and a high-level cognitive process for individuals. When analyzing complex problem solving in teams, an additional, new dimension has to be considered, as teamwork processes increase the requirements already put on individual team members. After introducing an idealized teamwork process model, that complex problem solving teams pass through, and integrating the relevant teamwork skills for interdependently working teams into the model and combining it with the four kinds of team processes (transition, action, interpersonal, and learning processes), the paper demonstrates the importance of fulfilling team process demands for successful complex problem solving within teams. Therefore, results from a controlled team study within complex situations are presented. The study focused on factors that influence action processes, like coordination, such as emergent states like collective orientation, cohesion, and trust and that dynamically enable effective teamwork in complex situations. Before conducting the experiments, participants were divided by median split into two-person teams with either high (n = 58) or low (n = 58) collective orientation values. The study was conducted with the microworld C3Fire, simulating dynamic decision making, and acting in complex situations within a teamwork context. The microworld includes interdependent tasks such as extinguishing forest fires or protecting houses. Two firefighting scenarios had been developed, which takes a maximum of 15 min each. All teams worked on these two scenarios. Coordination within the team and the resulting team performance were calculated based on a log-file analysis. The results show that no relationships between trust and action processes and team performance exist. Likewise, no relationships were found for cohesion. Only collective orientation of team members positively influences team performance in complex environments mediated by action processes such as

  8. Complex Problem Solving in Teams: The Impact of Collective Orientation on Team Process Demands.

    Science.gov (United States)

    Hagemann, Vera; Kluge, Annette

    2017-01-01

    Complex problem solving is challenging and a high-level cognitive process for individuals. When analyzing complex problem solving in teams, an additional, new dimension has to be considered, as teamwork processes increase the requirements already put on individual team members. After introducing an idealized teamwork process model, that complex problem solving teams pass through, and integrating the relevant teamwork skills for interdependently working teams into the model and combining it with the four kinds of team processes (transition, action, interpersonal, and learning processes), the paper demonstrates the importance of fulfilling team process demands for successful complex problem solving within teams. Therefore, results from a controlled team study within complex situations are presented. The study focused on factors that influence action processes, like coordination, such as emergent states like collective orientation, cohesion, and trust and that dynamically enable effective teamwork in complex situations. Before conducting the experiments, participants were divided by median split into two-person teams with either high ( n = 58) or low ( n = 58) collective orientation values. The study was conducted with the microworld C3Fire, simulating dynamic decision making, and acting in complex situations within a teamwork context. The microworld includes interdependent tasks such as extinguishing forest fires or protecting houses. Two firefighting scenarios had been developed, which takes a maximum of 15 min each. All teams worked on these two scenarios. Coordination within the team and the resulting team performance were calculated based on a log-file analysis. The results show that no relationships between trust and action processes and team performance exist. Likewise, no relationships were found for cohesion. Only collective orientation of team members positively influences team performance in complex environments mediated by action processes such as

  9. Complex Problem Solving in Teams: The Impact of Collective Orientation on Team Process Demands

    Directory of Open Access Journals (Sweden)

    Vera Hagemann

    2017-09-01

    Full Text Available Complex problem solving is challenging and a high-level cognitive process for individuals. When analyzing complex problem solving in teams, an additional, new dimension has to be considered, as teamwork processes increase the requirements already put on individual team members. After introducing an idealized teamwork process model, that complex problem solving teams pass through, and integrating the relevant teamwork skills for interdependently working teams into the model and combining it with the four kinds of team processes (transition, action, interpersonal, and learning processes, the paper demonstrates the importance of fulfilling team process demands for successful complex problem solving within teams. Therefore, results from a controlled team study within complex situations are presented. The study focused on factors that influence action processes, like coordination, such as emergent states like collective orientation, cohesion, and trust and that dynamically enable effective teamwork in complex situations. Before conducting the experiments, participants were divided by median split into two-person teams with either high (n = 58 or low (n = 58 collective orientation values. The study was conducted with the microworld C3Fire, simulating dynamic decision making, and acting in complex situations within a teamwork context. The microworld includes interdependent tasks such as extinguishing forest fires or protecting houses. Two firefighting scenarios had been developed, which takes a maximum of 15 min each. All teams worked on these two scenarios. Coordination within the team and the resulting team performance were calculated based on a log-file analysis. The results show that no relationships between trust and action processes and team performance exist. Likewise, no relationships were found for cohesion. Only collective orientation of team members positively influences team performance in complex environments mediated by action processes

  10. Red Teaming of Advanced Information Assurance Concepts

    International Nuclear Information System (INIS)

    DUGGAN, RUTH A.; WOOD, BRADLEY

    1999-01-01

    Red Teaming is an advanced form of assessment that can be used to identify weaknesses in a variety of cyber systems. it is especially beneficial when the target system is still in development when designers can readily affect improvements. This paper discusses the red team analysis process and the author's experiences applying this process to five selected Information Technology Office (ITO) projects. Some detail of the overall methodology, summary results from the five projects, and lessons learned are contained within this paper

  11. Strengths, weaknesses, opportunities and threats of virtual team in Nigerian construction industry

    Directory of Open Access Journals (Sweden)

    Odubiyi Tawakalitu Bisola

    2016-12-01

    Full Text Available The rationale behind any construction project varies; it might be to achieve value, time, quality, cost or just satisfaction for the client. Irrespective of any or all of these reasons, the team members involved in conception, inception, construction and delivery of a project are aware that a good teamwork is of essence. This is in the context of growing needs of client and the ever-growing improvement in methods of project delivery as influenced by technology. This article looks into the team type in the Nigerian construction industry from the angle of a virtual team (VT using the mixed-method research design. VT is simply a type of team wherein the members operate from different geographical regions and function majorly with the aid of information and communications technology media. Data for the study were collected from relevant literature, interviews were conducted with 20 selected professionals in the construction industry and, thereafter, a questionnaire was drafted from the results of the interviews and administered to selected relevant professionals. The study revealed that communication among team members, flexibility of operation and decision making are usually the most influencing strengths of the VT, while some of its weaknesses are a need for special training, conflict among team members and client’s acceptance of team type. Reduction in time-to-market, collaboration ability of team members and delivery time of project were seen as opportunities, while recognized threats were members’ performance level and complexity of technical application. The study concludes that the success of the VT depends highly on exploiting the opportunities opened to it.

  12. Tiger Team Assessment of the Fermi National Accelerator Laboratory

    International Nuclear Information System (INIS)

    1992-06-01

    This draft report documents the Tiger Team Assessment of the Fermi National Accelerator Laboratory (Fermilab) located in Batavia, Illinois. Fermilab is a program-dedicated national laboratory managed by the Universities Research Association, Inc. (URA) for the US Department of Energy (DOE). The Tiger Team Assessment was conducted from May 11 to June 8, 1992, under the auspices of DOE's Office of Special Projects (OSP) under the Office of the Assistant Secretary for Environment, Safety and Health (EH). The assessment was comprehensive, encompassing environmental, safety and health (ES ampersand H), and quality assurance (QA) disciplines; site remediation; facilities management; and waste management operations. Compliance with applicable Federal , State of Illinois, and local regulations; applicable DOE Orders; best management practices; and internal Fermilab requirements was addressed. In addition, an evaluation of the effectiveness of DOE and Fermilab management of the ES ampersand H/QA and self-assessment programs was conducted. The Fermilab Tiger Team Assessment is part a larger, comprehensive DOE Tiger Team Independent Assessment Program planned for DOE facilities. The objective of the initiative is to provide the Secretary of Energy with information on the compliance status of DOE facilities with regard to ES ampersand H requirements, root causes for noncompliance, adequacy of DOE and contractor ES ampersand H management programs, response actions to address the identified problem areas, and DOE-wide ES ampersand H compliance trends and root causes

  13. Team Effectiveness and Team Development in CSCL

    Science.gov (United States)

    Fransen, Jos; Weinberger, Armin; Kirschner, Paul A.

    2013-01-01

    There is a wealth of research on computer-supported cooperative work (CSCW) that is neglected in computer-supported collaborative learning (CSCL) research. CSCW research is concerned with contextual factors, however, that may strongly influence collaborative learning processes as well, such as task characteristics, team formation, team members'…

  14. Biomedical engineering education through global engineering teams.

    Science.gov (United States)

    Scheffer, C; Blanckenberg, M; Garth-Davis, B; Eisenberg, M

    2012-01-01

    Most industrial projects require a team of engineers from a variety of disciplines. The team members are often culturally diverse and geographically dispersed. Many students do not acquire sufficient skills from typical university courses to function efficiently in such an environment. The Global Engineering Teams (GET) programme was designed to prepare students such a scenario in industry. This paper discusses five biomedical engineering themed projects completed by GET students. The benefits and success of the programme in educating students in the field of biomedical engineering are discussed.

  15. Sourcing teams and interdepartmental integration

    DEFF Research Database (Denmark)

    Lidegaard, Nina; Ellegaard, Chris; Møller, Morten Munkgaard

    2015-01-01

    Internal integration is often mentioned as a prerequisite for conducting strategic sourcing, as multiple functional departments must collaborate on creating value-creating activities amongst them. Though it is one of many possibilities, the use of cross-functional teams is often the most commonly...... proposed solution to ensure internal integration. This paper presents an exploratory case study evaluating the use of internal integration mechanisms in a cross-functional sourcing process. Two commodity categories are examined. One is organised in a cross-functional team, while the other is not. Findings...... indicate that informal integration mechanisms not promoted by management or the organizational structure may contribute to the overall level of integration....

  16. Texas Team: Academic Progression and IOM Toolkit.

    Science.gov (United States)

    Reid, Helen; Tart, Kathryn; Tietze, Mari; Joseph, Nitha Mathew; Easley, Carson

    The Institute of Medicine (IOM) Future of Nursing report, identified eight recommendations for nursing to improve health care for all Americans. The Texas Team for Advancing Health Through Nursing embraced the challenge of implementing the recommendations through two diverse projects. One group conducted a broad, online survey of leadership, practice, and academia, focusing on the IOM recommendations. The other focused specifically on academic progression through the use of CABNET (Consortium for Advancing Baccalaureate Nursing Education in Texas) articulation agreements. The survey revealed a lack of knowledge and understanding of the IOM recommendations, prompting development of an online IOM toolkit. The articulation agreements provide a clear pathway for students to the RN-to-BSN degree students. The toolkit and articulation agreements provide rich resources for implementation of the IOM recommendations.

  17. Exploring Academics' Approaches to Managing Team Assessment

    Science.gov (United States)

    Augar, Naomi; Woodley, Carolyn J.; Whitefield, Despina; Winchester, Maxwell

    2016-01-01

    Purpose: The purpose of this paper is to develop an understanding of academics' approaches to managing team assessment at an Australian University with a view to informing policy development and assessment design. Design/methodology/approach: The research was conducted using a single exploratory case study approach focussing on the team assessment…

  18. Developing high-performance cross-functional teams: Understanding motivations, functional loyalties, and teaming fundamentals

    Energy Technology Data Exchange (ETDEWEB)

    Miller, M.A.

    1996-08-01

    Teamwork is the key to the future of effective technology management. Today`s technologies and markets have become too complex for individuals to work alone. Global competition, limited resources, cost consciousness, and time pressures have forced organizations and project managers to encourage teamwork. Many of these teams will be cross-functional teams that can draw on a multitude of talents and knowledge. To develop high-performing cross-functional teams, managers must understand motivations, functional loyalties, and the different backgrounds of the individual team members. To develop a better understanding of these issues, managers can learn from experience and from literature on teams and teaming concepts. When studying the literature to learn about cross-functional teaming, managers will find many good theoretical concepts, but when put into practice, these concepts have varying effects. This issue of varying effectiveness is what drives the research for this paper. The teaming concepts were studied to confirm or modify current understanding. The literature was compared with a {open_quotes}ground truth{close_quotes}, a survey of the reality of teaming practices, to examine the teaming concepts that the literature finds to be critical to the success of teams. These results are compared to existing teams to determine if such techniques apply in real-world cases.

  19. Global engineering teams - a programme promoting teamwork in engineering design and manufacturing

    Science.gov (United States)

    Oladiran, M. T.; Uziak, J.; Eisenberg, M.; Scheffer, C.

    2011-05-01

    Engineering graduates are expected to possess various competencies categorised into hard and soft skills. The hard skills are acquired through specific coursework, but the soft skills are often treated perfunctorily. Global Engineering Teams (GET) is a programme that promotes project-oriented tasks in virtual student teams working in collaboration with industry partners. Teamwork is a major success factor for GET as students always work in groups of varying sizes. A questionnaire-based survey of the 2008 cohort of GET students was conducted to assess teamwork, communication and conflict resolution among group members. The results confirmed that deliverables are readily achieved in teams and communication was open. A challenge of using virtual teams is the availability of high-speed Internet access. The GET programme shows that it is possible to deliver engineering design and manufacturing via industry/university collaboration. The programme also facilitates multidisciplinary teamwork at an international level.

  20. Tiger Team audits

    International Nuclear Information System (INIS)

    Cheney, G.T.

    1992-01-01

    This paper will address the purpose, scope, and approach of the Department of Energy Tiger Team Assessments. It will use the Tiger Team Assessment experience of Sandia National Laboratories at Albuquerque, New Mexico, as illustration

  1. Leadership Team | Wind | NREL

    Science.gov (United States)

    Leadership Team Leadership Team Learn more about the expertise and technical skills of the wind Initiative and provides leadership in the focus areas of high-fidelity modeling, wind power plant controls

  2. Teaming up for learning

    NARCIS (Netherlands)

    Fransen, Jos

    2012-01-01

    Fransen, J. (2012). Teaming up for learning: Team effectiveness in collaborative learning in higher education (Doctoral dissertation). November, 16, 2012, Open University in the Netherlands (CELSTEC), Heerlen, The Netherlands.

  3. Culture and teams.

    Science.gov (United States)

    Kirkman, Bradley L; Shapiro, Debra L; Lu, Shuye; McGurrin, Daniel P

    2016-04-01

    We first review research on culture effects in teams, illustrating that mean levels of team cultural values have main (i.e. direct) effects, indirect effects (i.e. mediated by intervening variables), and moderating influences on team processes and outcomes. Variance in team cultural values or on country of origin (i.e. nationality diversity) also has main effects on team functioning, and we highlight contextual variables that strengthen or weaken these main effects. We next review research examining the effect of variance in team cultural values on global virtual teams, specifically. Finally, we review research on how cultural values shape employees' receptivity to empowering leadership behavior in teams. We conclude by discussing critical areas for future research. Published by Elsevier Ltd.

  4. Your Dialysis Care Team

    Science.gov (United States)

    ... A to Z Health Guide Your Dialysis Care Team Tweet Share Print Email Good health care is ... dialyzers (artificial kidneys) for reuse. Vascular Access Care Team If you are a hemodialysis patient, another group ...

  5. Building multidisciplinary business teams

    International Nuclear Information System (INIS)

    Dyson, C.J.; Winte, N.C.

    1991-01-01

    This paper is a description of an approach to managing Exploration and Production assets through the operation of multidisciplinary business teams. The business team approach can assist in improved asset performance in terms of efficiency, motivation and business results, compared with more traditional matrix style hierarchies. Within this paper certain critical success factors for the long term success of multidiscipline teams are outlined, together with some of the risk of business team operation

  6. Toward Learning Teams

    DEFF Research Database (Denmark)

    Hoda, Rashina; Babb, Jeff; Nørbjerg, Jacob

    2013-01-01

    to sacrifice learning-focused practices. Effective learning under pressure involves conscious efforts to implement original agile practices such as retrospectives and adapted strategies such as learning spikes. Teams, their management, and customers must all recognize the importance of creating learning teams......Today's software development challenges require learning teams that can continuously apply new engineering and management practices, new and complex technical skills, cross-functional skills, and experiential lessons learned. The pressure of delivering working software often forces software teams...

  7. Formalization of Team Creation

    OpenAIRE

    Cerman, Tomáš

    2010-01-01

    This paper is divided to practical and theoretical part. Theoretical part defines essential background of personality and work psychology which are pillars for using the personality and roles typology in practical part. I also define conceptions such as group, team, procedures of making the team. Practical part is focused at making the repertoary grid which outlines proximity of team roles, anchored in the repertoary grids upon personal atributes basis and picked team positions.

  8. Conductivity Probe

    Science.gov (United States)

    2008-01-01

    The Thermal and Electrical Conductivity Probe (TECP) for NASA's Phoenix Mars Lander took measurements in Martian soil and in the air. The needles on the end of the instrument were inserted into the Martian soil, allowing TECP to measure the propagation of both thermal and electrical energy. TECP also measured the humidity in the surrounding air. The needles on the probe are 15 millimeters (0.6 inch) long. The Phoenix Mission is led by the University of Arizona, Tucson, on behalf of NASA. Project management of the mission is by NASA's Jet Propulsion Laboratory, Pasadena, Calif. Spacecraft development is by Lockheed Martin Space Systems, Denver.

  9. Fostering teachers' team learning

    NARCIS (Netherlands)

    Bouwmans, Machiel; Runhaar, Piety; Wesselink, Renate; Mulder, Martin

    2017-01-01

    The implementation of educational innovations by teachers seems to benefit from a team approach and team learning. The study's goal is to examine to what extent transformational leadership is associated with team learning, and to investigate the mediating roles of participative decision-making,

  10. Leadership for Distributed Teams

    NARCIS (Netherlands)

    De Rooij, J.P.G.

    2009-01-01

    The aim of this dissertation was to study the little examined, yet important issue of leadership for distributed teams. Distributed teams are defined as: “teams of which members are geographically distributed and are therefore working predominantly via mediated communication means on an

  11. The role of social capital on trust development and dynamics: Implications for cooperation, monitoring and team performance

    NARCIS (Netherlands)

    Costa, A.C.; Bijlsma-Frankema, K.M.; de Jong, B.A.

    2009-01-01

    This study examined the development and dynamics of trust in project teams and explored the relation with cooperation, monitoring and team performance. Two types of teams were distinguished at the start of the projects: low prior social-capital teams (teams composed of members that have no previous

  12. Team-Based Care: A Concept Analysis.

    Science.gov (United States)

    Baik, Dawon

    2017-10-01

    The purpose of this concept analysis is to clarify and analyze the concept of team-based care in clinical practice. Team-based care has garnered attention as a way to enhance healthcare delivery and patient care related to quality and safety. However, there is no consensus on the concept of team-based care; as a result, the lack of common definition impedes further studies on team-based care. This analysis was conducted using Walker and Avant's strategy. Literature searches were conducted using PubMed, Cumulative Index to Nursing and Allied Health Literature (CINAHL), and PsycINFO, with a timeline from January 1985 to December 2015. The analysis demonstrates that the concept of team-based care has three core attributes: (a) interprofessional collaboration, (b) patient-centered approach, and (c) integrated care process. This is accomplished through understanding other team members' roles and responsibilities, a climate of mutual respect, and organizational support. Consequences of team-based care are identified with three aspects: (a) patient, (b) healthcare professional, and (c) healthcare organization. This concept analysis helps better understand the characteristics of team-based care in the clinical practice as well as promote the development of a theoretical definition of team-based care. © 2016 Wiley Periodicals, Inc.

  13. Rapid response teams: qualitative analysis of their effectiveness.

    Science.gov (United States)

    Leach, Linda Searle; Mayo, Ann M

    2013-05-01

    Multidisciplinary rapid response teams focus on patients' emergent needs and manage critical situations to prevent avoidable deaths. Although research has focused primarily on outcomes, studies of the actual team effectiveness within the teams from multiple perspectives have been limited. To describe effectiveness of rapid response teams in a large teaching hospital in California that had been using such teams for 5 years. The grounded-theory method was used to discover if substantive theory might emerge from interview and/or observational data. Purposeful sampling was used to conduct in-person semistructured interviews with 17 key informants. Convenience sampling was used for the 9 observed events that involved a rapid response team. Analysis involved use of a concept or indicator model to generate empirical results from the data. Data were coded, compared, and contrasted, and, when appropriate, relationships between concepts were formed. Results Dimensions of effective team performance included the concepts of organizational culture, team structure, expertise, communication, and teamwork. Professionals involved reported that rapid response teams functioned well in managing patients at risk or in crisis; however, unique challenges were identified. Teams were loosely coupled because of the inconsistency of team members from day to day. Team members had little opportunity to develop relationships or team skills. The need for team training may be greater than that among teams that work together regularly under less time pressure to perform. Communication between team members and managing a crisis were critical aspects of an effective response team.

  14. The impact of team familiarity and team leader experience on team coordination errors: A panel analysis of professional basketball teams

    NARCIS (Netherlands)

    Sieweke, Jost; Zhao, B.

    2015-01-01

    To explore the dynamics involved in team coordination, we examine the impact of team familiarity and team leader experience on team coordination errors (TCEs). We argue that team familiarity has a U-shaped effect on TCEs. We study the moderating effects of team leader prior experience and team

  15. Gender and tenure diversity in GitHub teams

    NARCIS (Netherlands)

    Vasilescu, B.N.; Posnett, D.; Ray, B.; Brand, van den M.G.J.; Serebrenik, A.; Devanbu, P.; Filkov, V.

    2015-01-01

    Software development is usually a collaborative venture. Open Source Software (OSS) projects are no exception; indeed, by design, the OSS approach can accommodate teams that are more open, geographically distributed, and dynamic than commercial teams. This, we find, leads to OSS teams that are quite

  16. PENGARUH EMOTIONAL INTELLEGENCE, KNOWLEDGE SHARING DAN TEAM CONFLICT TERHADAP TEAM PERFORMANCE DI RUMAH SAKIT UNDATA PALU

    Directory of Open Access Journals (Sweden)

    Lukman Setiawan

    2017-08-01

    Full Text Available This research aimed to: (1 analyze the influence of emotional intellegence to performance team at Undata Hospital, (2 to analyze the influence of Knowledge Sharing to the performance team at Undata Hospital, (3 to analyze the influence of  team conflict to the team Performance at Undata Hospital, (4 to analyze the influence of emotional intellegence, Knowledge Sharing and team Conflict to the team Performance at Undata Hospital, (5 to know the dominant variable affecting the performance team at Undata Hospital. This study uses primary data through survey as many as 31 employees of the leadership element as a sample, the survey conducted for 2 (two months of May s.d July 2017. Data were analyzed using the program SPSS.22 The results showed that: (1 Emotional Intelligence and knowledge sharing have positive and significant influence on performance team at Undata Hospital, (2 Emotional Intellegence dominant influence to performance team at Undata Hospital. This means that emotional intellegence, knowledge sharing and team conflict can improve team performance at Undata Hospital with scientific facts found in this study indicate that emotional intellegence is the dominant variable of influence on team performance at Undata Hospital

  17. Implicit Coordination Strategies for Effective Team Communication.

    Science.gov (United States)

    Butchibabu, Abhizna; Sparano-Huiban, Christopher; Sonenberg, Liz; Shah, Julie

    2016-06-01

    We investigated implicit communication strategies for anticipatory information sharing during team performance of tasks with varying degrees of complexity. We compared the strategies used by teams with the highest level of performance to those used by the lowest-performing teams to evaluate the frequency and methods of communications used as a function of task structure. High-performing teams share information by anticipating the needs of their teammates rather than explicitly requesting the exchange of information. As the complexity of a task increases to involve more interdependence among teammates, the impact of coordination on team performance also increases. This observation motivated us to conduct a study of anticipatory information sharing as a function of task complexity. We conducted an experiment in which 13 teams of four people performed collaborative search-and-deliver tasks with varying degrees of complexity in a simulation environment. We elaborated upon prior characterizations of communication as implicit versus explicit by dividing implicit communication into two subtypes: (a) deliberative/goal information and (b) reactive status updates. We then characterized relationships between task structure, implicit communication, and team performance. We found that the five teams with the fastest task completion times and lowest idle times exhibited higher rates of deliberative communication versus reactive communication during high-complexity tasks compared with the five teams with the slowest completion times and longest idle times (p = .039). Teams in which members proactively communicated information about their next goal to teammates exhibited improved team performance. The findings from our work can inform the design of communication strategies for team training to improve performance of complex tasks. © 2016, Human Factors and Ergonomics Society.

  18. Youth, Team sports and Citizenship

    DEFF Research Database (Denmark)

    Ryom, Knud; Stelter, Reinhard

    of a team sports project as well as coaching and mentoring, the project goal was to challenge the boys to be part of a new shared and empowering community, so that they actively experienced the ability to take responsibility for themselves and others in the arenas where they lived. In close co......-operation with the local sports club ’Nørrebro United’, 26 volunteer coaches (coaching the boys in school), school staff, the local community and not least the young people themselves, the intervention gradually took it’s own form. The intention of this strong local co-operation, was to clarify the young participants...... bullet points. We will use voices from the project, like volunteer coaches and the local sports club Nørrebro United. This final discussion will broaden the local agenda of this research project towards a more general discussion with the participants....

  19. Conductive concrete wins Popular Science prize

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1997-06-01

    A conductive concrete developed by a research team at IRC (Institute for Research in Construction, National Research Council of Canada) has won a prize in the home technology category because of its possible use in heating homes. Following the award, there have been a number of inquiries regarding possible applications for the concrete. Greatest interests in the concrete have been in its potential to heat buildings by using it as flooring. Other possible applications included de-icing pavements to building warming pads for parking aircraft. Essentially, carbon fibres and conductive particles are added to a concrete mix in such a quantity that they form a network within the mix, ensuring high electrical conductivity. A demonstration project is underway to build a 20 by 80 foot conductive concrete pad to test the material`s capability as a snow removal and de-icing tool.

  20. A pleasure working together? : the effects of dissimilarity in team member conscientiousness on team temporal processes and individual satisfaction

    NARCIS (Netherlands)

    Gevers, J.M.P.; Peeters, M.A.G.

    2009-01-01

    In this study of 43 student project teams, we tested a multi-level mediation model of the relationship between dissimilarity in conscientiousness, team temporal processes, and team member satisfaction. We distinguished between individual-level dissimilarity in conscientiousness (i.e., the distance

  1. NASA Microgravity Science Competition for High-school-aged Student Teams

    Science.gov (United States)

    DeLombard, Richard; Stocker, Dennis; Hodanbosi, Carol; Baumann, Eric

    2002-01-01

    NASA participates in a wide variety of educational activities including competitive events. There are competitive events sponsored by NASA and student teams which are mentored by NASA centers. This participation by NASA in public forums serves to bring the excitement of aerospace science to students and educators. A new competition for highschool-aged student teams involving projects in microgravity has completed two pilot years and will have national eligibility for teams during the 2002-2003 school year. A team participating in the Dropping In a Microgravity Environment will research the field of microgravity, develop a hypothesis, and prepare a proposal for an experiment to be conducted in a microgravity drop tower facility. A team of NASA scientists and engineers will select the top proposals and those teams will then design and build their experiment apparatus. When the experiment apparatus are completed, team representatives will visit NASA Glenn in Cleveland, Ohio for operation of their facility and participate in workshops and center tours. Presented in this paper will be a description of DIME, an overview of the planning and execution of such a program, results from the first two pilot years, and a status of the first national competition.

  2. Tiger Team Assessment of the Oak Ridge K-25 Site

    International Nuclear Information System (INIS)

    1991-12-01

    The Office of Special Projects in the Office of the Assistant Secretary for Environment, Safety, and Health (EH) has the responsibility to conduct Tiger Team Assessments for the Secretary of Energy. This report documents the Tiger Team Assessment of the Oak Ridge K-25 Site (K-25 Site), Oak Ridge, Tennessee. The purpose of the Assessment is to provide the Secretary of Energy with concise information on the: current ES ampersand H compliance status of the Site and the vulnerabilities associated with that compliance status; root causes for noncompliance; adequacy of DOE and site contractor ES ampersand H management programs; adequacy of response actions developed to address identified problem areas; and adequacy of ES ampersand H self-assessments and the institutionalization of the self-assessment process at the K-25 Site

  3. Foundations for a Team Oriented Curriculum

    Science.gov (United States)

    Neal, Brandi; Martz, Ben

    2016-01-01

    The business world today values collaboration and team work skills such as those found in the area of project management, business process reengineering, quality circles, etc. In response, the use of group projects permeates many curricula today with varying consequences and levels of success. Technology claims to enhance collaboration in…

  4. A Measure of Team Resilience: Developing the Resilience at Work Team Scale.

    Science.gov (United States)

    McEwen, Kathryn; Boyd, Carolyn M

    2018-03-01

    This study develops, and initial evaluates, a new measure of team-based resilience for use in research and practice. We conducted preliminary analyses, based on a cross-sectional sample of 344 employees nested within 31 teams. Seven dimensions were identified through exploratory and confirmatory factor analyses. The measure had high reliability and significant discrimination to indicate the presence of a unique team-based aspect of resilience that contributed to higher work engagement and higher self-rated team performance, over and above the effects of individual resilience. Multilevel analyses showed that team, but not individual, resilience predicted self-rated team performance. Practice implications include a need to focus on collective as well as individual behaviors in resilience-building. The measure provides a diagnostic instrument for teams and a scale to evaluate organizational interventions and research the relationship of resilience to other constructs.

  5. How Team-Level and Individual-Level Conflict Influences Team Commitment: A Multilevel Investigation

    Science.gov (United States)

    Lee, Sanghyun; Kwon, Seungwoo; Shin, Shung J.; Kim, MinSoo; Park, In-Jo

    2018-01-01

    We investigate how two different types of conflict (task conflict and relationship conflict) at two different levels (individual-level and team-level) influence individual team commitment. The analysis was conducted using data we collected from 193 employees in 31 branch offices of a Korean commercial bank. The relationships at multiple levels were tested using hierarchical linear modeling (HLM). The results showed that individual-level relationship conflict was negatively related to team commitment while individual-level task conflict was not. In addition, both team-level task and relationship conflict were negatively associated with team commitment. Finally, only team-level relationship conflict significantly moderated the relationship between individual-level relationship conflict and team commitment. We further derive theoretical implications of these findings. PMID:29387033

  6. How Team-Level and Individual-Level Conflict Influences Team Commitment: A Multilevel Investigation

    Directory of Open Access Journals (Sweden)

    Sanghyun Lee

    2018-01-01

    Full Text Available We investigate how two different types of conflict (task conflict and relationship conflict at two different levels (individual-level and team-level influence individual team commitment. The analysis was conducted using data we collected from 193 employees in 31 branch offices of a Korean commercial bank. The relationships at multiple levels were tested using hierarchical linear modeling (HLM. The results showed that individual-level relationship conflict was negatively related to team commitment while individual-level task conflict was not. In addition, both team-level task and relationship conflict were negatively associated with team commitment. Finally, only team-level relationship conflict significantly moderated the relationship between individual-level relationship conflict and team commitment. We further derive theoretical implications of these findings.

  7. The Development, Content, Design, and Conduct of the 2011 Piloted US DOE Nuclear Criticality Safety Program Criticality Safety Engineering Training and Education Project

    International Nuclear Information System (INIS)

    Hopper, Calvin Mitchell

    2011-01-01

    In May 1973 the University of New Mexico conducted the first nationwide criticality safety training and education week-long short course for nuclear criticality safety engineers. Subsequent to that course, the Los Alamos Critical Experiments Facility (LACEF) developed very successful 'hands-on' subcritical and critical training programs for operators, supervisors, and engineering staff. Since the inception of the US Department of Energy (DOE) Nuclear Criticality Technology and Safety Project (NCT and SP) in 1983, the DOE has stimulated contractor facilities and laboratories to collaborate in the furthering of nuclear criticality as a discipline. That effort included the education and training of nuclear criticality safety engineers (NCSEs). In 1985 a textbook was written that established a path toward formalizing education and training for NCSEs. Though the NCT and SP went through a brief hiatus from 1990 to 1992, other DOE-supported programs were evolving to the benefit of NCSE training and education. In 1993 the DOE established a Nuclear Criticality Safety Program (NCSP) and undertook a comprehensive development effort to expand the extant LACEF 'hands-on' course specifically for the education and training of NCSEs. That successful education and training was interrupted in 2006 for the closing of the LACEF and the accompanying movement of materials and critical experiment machines to the Nevada Test Site. Prior to that closing, the Lawrence Livermore National Laboratory (LLNL) was commissioned by the US DOE NCSP to establish an independent hands-on NCSE subcritical education and training course. The course provided an interim transition for the establishment of a reinvigorated and expanded two-week NCSE education and training program in 2011. The 2011 piloted two-week course was coordinated by the Oak Ridge National Laboratory (ORNL) and jointly conducted by the Los Alamos National Laboratory (LANL) classroom education and facility training, the Sandia National

  8. Tiger Team Assessment of the Strategic Petroleum Reserve

    International Nuclear Information System (INIS)

    1992-04-01

    This report documents the Tiger Team Assessment of the Strategic Petroleum Reserves (SPR) located in Louisiana and Texas, which consists of a project management office in New Orleans, a marine terminal located on the Mississippi River in Louisiana, and five crude oil storage sites in Louisiana and Texas. SPR is operated by Boeing Petroleum Services, Inc. for the US Department of Energy (DOE). DOE's Office of Fossil Energy (FE) is the responsible program organization and the Department of Energy Strategic Petroleum Reserve Project Management Office (SPRPMO) in Louisiana provides local oversight. The Tiger Team Assessment was conducted from March 9 to April 10, 1992, under the auspices of DOE's Office of Special Projects (OSP) under the Office of Environment, Safety and Health (EH). The assessment was comprehensive, encompassing environmental, safety, and health (ES ampersand H), and quality assurance (QA) disciplines; site remediation; facilities management; and waste management operations. Compliance with applicable Federal, States of Louisiana and Texas, and local regulations; applicable DOE Orders; best management practices; and internal SPR requirements was assessed. In addition, an evaluation of the adequacy and effectiveness of SPRPMO and BPS management of the ES ampersand H/QA and self-assessment programs was conducted. 6 fig., 22 tab

  9. Exploration of Team Integration in Spanish Multifamily Residential Building Construction

    OpenAIRE

    Pellicer, Eugenio; Sanz Benlloch, María Amalia; Esmaeili, B.; MOLENAAR, KEITH ROBERT

    2016-01-01

    Project delivery team integration generally involves early involvement of general contractors and key specialty contractors in the design process. Team integration has been found to improve an owner’s probability of success. However, during difficult economic times, owners can forego early team involvement and move toward low bid procurement to take advantage of competitive markets. This study explores the performance of integrated teams in the Spanish multifamily building constructi...

  10. Diagnosing and improving functioning in interdisciplinary health care teams.

    Science.gov (United States)

    Blackmore, Gail; Persaud, D David

    2012-01-01

    Interdisciplinary teams play a key role in the delivery of health care. Team functioning can positively or negatively impact the effective and efficient delivery of health care services as well as the personal well-being of group members. Additionally, teams must be able and willing to work together to achieve team goals within a climate that reflects commitment to team goals, accountability, respect, and trust. Not surprisingly, dysfunctional team functioning can limit the success of interdisciplinary health care teams. The first step in improving dysfunctional team function is to conduct an analysis based on criteria necessary for team success, and this article provides meaningful criteria for doing such an analysis. These are the following: a common team goal, the ability and willingness to work together to achieve team goals, decision making, communication, and team member relationships. High-functioning interdisciplinary teams must exhibit features of good team function in all key domains. If a team functions well in some domains and needs to improve in others, targeted strategies are described that can be used to improve team functioning.

  11. When Teams Fail to Self-Regulate: Predictors and Outcomes of Team Procrastination Among Debating Teams.

    Science.gov (United States)

    Van Hooft, Edwin A J; Van Mierlo, Heleen

    2018-01-01

    Models of team development have indicated that teams typically engage in task delay during the first stages of the team's life cycle. An important question is to what extent this equally applies to all teams, or whether there is variation across teams in the amount of task delay. The present study introduces the concept of team procrastination as a lens through which we can examine whether teams collectively engage in unplanned, voluntary, and irrational delay of team tasks. Based on theory and research on self-regulation, team processes, and team motivation we developed a conceptual multilevel model of predictors and outcomes of team procrastination. In a sample of 209 student debating teams, we investigated whether and why teams engage in collective procrastination as a team, and what consequences team procrastination has in terms of team member well-being and team performance. The results supported the existence of team procrastination as a team-level construct that has some stability over time. The teams' composition in terms of individual-level trait procrastination, as well as the teams' motivational states (i.e., team learning goal orientation, team performance-approach goal orientation in interaction with team efficacy) predicted team procrastination. Team procrastination related positively to team members' stress levels, especially for those low on trait procrastination. Furthermore, team procrastination had an indirect negative relationship with team performance, through teams' collective stress levels. These findings add to the theoretical understanding of self-regulatory processes of teams, and highlight the practical importance of paying attention to team-level states and processes such as team goal orientation and team procrastination.

  12. Interpersonal team leadership skills.

    Science.gov (United States)

    Nelson, M

    1995-05-01

    To say that a team leader's job is a tough one is certainly not saying enough. It is up to the team leader to manage a group of people to be individuals but yet work as a team. The team leader must keep the peace and yet create a revolution with this group all at the same time. The good leader will require a lot of education, training, and tons of practical application to be a success. The good news, however, is that the team leader's job is a rewarding one, one that they'll always feel good about if they do it right. How many of us get the opportunity to take a group of wonderful, thinking individual minds and pull from them ideas that a whole team can take to success? Yes, the job is indeed tough, but the paybacks are many.

  13. Leader emotional intelligence, transformational leadership, trust and team commitment: Testing a model within a team context

    Directory of Open Access Journals (Sweden)

    Anton F. Schlechter

    2008-06-01

    Full Text Available This exploratory study tested a model within a team context consisting of transformational-leadership behaviour, team-leader emotional intelligence, trust (both in the team leader and in the team members and team commitment. It was conducted within six manufacturing plants, with 25 teams participating. Of the 320 surveys distributed to these teams, 178 were received (which equals a 56% response rate. The surveys consisted of the multi-factor leadership questionnaire (MLQ, the Swinburne University emotional intelligence test (SUEIT, the organisational-commitment scale (OCS (adapted for team commitment and the workplace trust survey (WTS. The validity of these scales was established using exploratory factor analysis (EFA and confrmatory factor analysis (CFA. The Cronbach alpha was used to assess the reliability of the scales. The model was tested using structural equation modelling (SEM; an acceptable level of model ft was found. Signifcant positive relationships were further found among all the constructs. Such an integrated model has not been tested in a team context before and the positive fndings therefore add to existing teamwork literature. The fnding that transformational leadership and leader emotional intelligence are positively related to team commitment and trust further emphasises the importance of effective leadership behaviour in team dynamics and performance.

  14. Managing Geographically Dispersed Teams: From Temporary to Permanent Global Virtual Teams

    DEFF Research Database (Denmark)

    Svane Hansen, Tine; Hope, Alexander John; Moehler, Robert C.

    2012-01-01

    for organisations to move towards establishing permanent Global Virtual Teams in order to leverage knowledge sharing and cooperation across distance. To close this gap, this paper will set the scene for a research project investigating the changed preconditions for organisations. As daily face-to-face communication......The rise and spread of information communication technologies (ICT) has enabled increasing use of geographically dispersed work teams (Global Virtual Teams). Originally, Global Virtual Teams were mainly organised into temporary projects. Little research has focused on the emergent challenge...... generation of self-lead digital natives, who are already practising virtual relationships and a new approach to work, and currently joining the global workforce; and improved communication technologies. Keywords: Global Virtual teams, ICT, leadership, motivation, self-management, millenials....

  15. Program Development Plan and Team up; FINAL

    International Nuclear Information System (INIS)

    Solar Electric Power Association

    2001-01-01

    The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead

  16. Program Development Plan and Team up

    Energy Technology Data Exchange (ETDEWEB)

    Solar Electric Power Association

    2001-12-01

    The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead.

  17. Leadership: Enhancing Team Adaptability in Dynamic Settings

    National Research Council Canada - National Science Library

    Klein, Katherine J; Kozlowski, Steve W

    2008-01-01

    .... The authors conducted five interrelated research projects, combining research methods and approaches -- including comprehensive foundational literature reviews, theory development, experimental...

  18. Reaping the benefits of task conflict in teams: the critical role of team psychological safety climate.

    Science.gov (United States)

    Bradley, Bret H; Postlethwaite, Bennett E; Klotz, Anthony C; Hamdani, Maria R; Brown, Kenneth G

    2012-01-01

    Past research suggests that task conflict may improve team performance under certain conditions; however, we know little about these specific conditions. On the basis of prior theory and research on conflict in teams, we argue that a climate of psychological safety is one specific context under which task conflict will improve team performance. Using evidence from 117 project teams, the present research found that psychological safety climate moderates the relationship between task conflict and performance. Specifically, task conflict and team performance were positively associated under conditions of high psychological safety. The results support the conclusion that psychological safety facilitates the performance benefits of task conflict in teams. Theoretical implications and suggestions for future research are discussed.

  19. The human side of lean teams.

    Science.gov (United States)

    Wackerbarth, Sarah B; Strawser-Srinath, Jamie R; Conigliaro, Joseph C

    2015-05-01

    Organizations use lean principles to increase quality and decrease costs. Lean projects require an understanding of systems-wide processes and utilize interdisciplinary teams. Most lean tools are straightforward, and the biggest barrier to successful implementation is often development of the team aspect of the lean approach. The purpose of this article is to share challenges experienced by a lean team charged with improving a hospital discharge process. Reflection on the experience provides an opportunity to highlight lessons from The Team Handbook by Peter Scholtes and colleagues. To improve the likelihood that process improvement initiatives, including lean projects, will be successful, organizations should consider providing training in organizational change principles and team building. The authors' lean team learned these lessons the hard way. Despite the challenges, the team successfully implemented changes throughout the organization that have had a positive impact. Training to understand the psychology of change might have decreased the resistance faced in implementing these changes. © 2014 by the American College of Medical Quality.

  20. Collaboration and Team Science Field Guide - Center for Research Strategy

    Science.gov (United States)

    Collaboration and Team Science: A Field Guide provides insight into the practices of conducting collaborative work. Since its 2010 publication, the authors have worked and learned from teams and organizations all over the world. Learn from these experiences in the second edition of the Team Science Field Guide.

  1. Team Learning: Through the Relational Dynamics of Co-operation and Rivalry in Team Communities

    Science.gov (United States)

    Lotz, Maja

    2010-01-01

    This paper explores the constructive links between cooperation, rivalry, and learning within the structure of team communities. Drawing upon social learning theory and qualitative data from case studies conducted in Danish team-based firms, the main purpose is to argue that both cooperation and rivalry are important triggers for mobilizing…

  2. Team knowledge research: emerging trends and critical needs.

    Science.gov (United States)

    Wildman, Jessica L; Thayer, Amanda L; Pavlas, Davin; Salas, Eduardo; Stewart, John E; Howse, William R

    2012-02-01

    This article provides a systematic review of the team knowledge literature and guidance for further research. Recent research has called attention to the need for the improved study and understanding of team knowledge. Team knowledge refers to the higher level knowledge structures that emerge from the interactions of individual team members. We conducted a systematic review of the team knowledge literature, focusing on empirical work that involves the measurement of team knowledge constructs. For each study, we extracted author degree area, study design type, study setting, participant type, task type, construct type, elicitation method, aggregation method, measurement timeline, and criterion domain. Our analyses demonstrate that many of the methodological characteristics of team knowledge research can be linked back to the academic training of the primary author and that there are considerable gaps in our knowledge with regard to the relationships between team knowledge constructs, the mediating mechanisms between team knowledge and performance, and relationships with criteria outside of team performance, among others. We also identify categories of team knowledge not yet examined based on an organizing framework derived from a synthesis of the literature. There are clear opportunities for expansion in the study of team knowledge; the science of team knowledge would benefit from a more holistic theoretical approach. Human factors researchers are increasingly involved in the study of teams. This review and the resulting organizing framework provide researchers with a summary of team knowledge research over the past 10 years and directions for improving further research.

  3. Facilitating Transition to Team Based Design Education

    DEFF Research Database (Denmark)

    Tollestrup, Christian

    2014-01-01

    profession, but at the same time it becomes very difficult to identify where and how the design is created since form-giving now becomes a group effort. So as a way to ease the transition from highly framed and facilitated high school learning context to university self-driven learning context a small...... given to two set of students; one set that received the survival kit in 2011 and 2012 and one set that did not. The questionnaire inquires the students’ attitude towards 4 aspects: 1.General level of preparedness for team and problem based project work 2.Level of information of expectations from...... supervisors and programme 3.Reflection of the role in a team, problem based project work 4.The level of information of special expectations from the Industrial Design program towards team and problem based project work. Results indicates that Class receiving the “Survival Kit” improved in the calibration...

  4. Payment Mechanisms for Integrated Teams in Construction

    Directory of Open Access Journals (Sweden)

    Ibrahim Motawa

    2012-11-01

    Full Text Available The overwhelming consensus for process andteam integration has emerged as an enabler tomanage construction projects. Theperformance of integrated teams is highlyaffected by the adopted payment mechanism.However, the payment mechanisms availablefor a project may need the team tocompromise in order to agree on a fairmechanism for as many members as possible.This paper introduces a methodology tosimulate the profiles of alternative paymentmechanisms. The methodology aims to helpproject teams define the most appropriatemechanism for each member. The proposedmethodology is therefore novel and superior toexisting cash flow models where the focus hasbeen limited to main contractors only. Topromote its use as a performance enablingmechanism, the methodology utilizes “theproject process map”, “the stakeholders &supply chain”, “the pricing method” and “thepayment mechanism”. This will act as an aid todesign or “fine-tune” payment mechanisms toindividual projects characteristics consideringpayment for off-site materials andcomponents, which always concerns projectfabricators and supply chain.

  5. Developing Expert Teams with a Strong Safety Culture

    Science.gov (United States)

    Rogers, David G.

    2010-01-01

    Would you like to lead a world renowned team that draws out all the talents and expertise of its members and consistently out performs all others in the industry? Ever wonder why so many organizations fail to truly learn from past mistakes only to repeat the same ones at a later date? Are you a program/project manager or team member in a high-risk organization where the decisions made often carry the highest of consequences? Leadership, communication, team building, critical decision-making and continuous team improvement skills and behaviors are mere talking points without the attitudes, commitment and strategies necessary to make them the very fabric of a team. Developing Expert Teams with a Strong Safety Culture, will provide you with proven knowledge and strategies to take your team soaring to heights you may have not thought possible. A myriad of teams have applied these strategies and techniques within their organization team environments: military and commercial aviation, astronaut flight crews, Shuttle flight controllers, members of the Space Shuttle Program Mission Management Team, air traffic controllers, nuclear power control teams, surgical teams, and the fire service report having spectacular success. Many industry leaders are beginning to realize that although the circumstances and environments of these teams may differ greatly to their own, the core elements, governing principles and dynamics involved in managing and building a stellar safety conscious team remain identical.

  6. Understanding the Effects of Team Cognition Associated with Complex Engineering Tasks: Dynamics of Shared Mental Models, Task-SMM, and Team-SMM

    Science.gov (United States)

    Lee, Miyoung; Johnson, Tristan E.

    2008-01-01

    This study investigates how shared mental models (SMMs) change over time in teams of students in a manufacturing engineering course. A complex ill-structured project was given to each team. The objective of the team project was to analyze, test, and propose ways to improve their given manufactured product. Shared mental models were measured in…

  7. Expanding the Advising Team.

    Science.gov (United States)

    Glennen, Robert E.; And Others

    1989-01-01

    The process and results of team building by Emporia State University's centralized advising center are examined from the perspectives of president, enrollment management, centralized advising, and faculty. The effort demonstrates that administrative, state, and team commitment can produce positive results in freshman retention, higher graduation…

  8. Cooperative Team Networks

    Science.gov (United States)

    2016-06-01

    team processes, such as identifying motifs of dynamic communication exchanges which goes well beyond simple dyadic and triadic configurations; as well...new metrics and ways to formulate team processes, such as identifying motifs of dynamic communication exchanges which goes well beyond simple dyadic ...sensing, communication , information, and decision networks - Darryl Ahner (AFIT: Air Force Inst Tech) Panel Session: Mathematical Models of

  9. Interactive Team Cognition

    Science.gov (United States)

    Cooke, Nancy J.; Gorman, Jamie C.; Myers, Christopher W.; Duran, Jasmine L.

    2013-01-01

    Cognition in work teams has been predominantly understood and explained in terms of shared cognition with a focus on the similarity of static knowledge structures across individual team members. Inspired by the current zeitgeist in cognitive science, as well as by empirical data and pragmatic concerns, we offer an alternative theory of team…

  10. Climate Action Team

    Science.gov (United States)

    Science Partnerships Contact Us Climate Action Team & Climate Action Initiative The Climate Action programs and the state's Climate Adaptation Strategy. The CAT members are state agency secretaries and the . See CAT reports Climate Action Team Pages CAT Home Members Working Groups Reports Back to Top

  11. Team Leadership in Practice.

    Science.gov (United States)

    Neck, Christopher; Manz, Charles C.; Manz, Karen P.

    1998-01-01

    Although educational teams can help reduce teachers' feelings of isolation and enhance instruction, ineffective leadership often dooms their efforts. This article describes four team leadership approaches: "strong-man,""transactor,""visionary hero," and "SuperLeadership." The last is superior, since it…

  12. Gender diversity in teams

    OpenAIRE

    Ghazala Azmat

    2014-01-01

    Women’s representation on corporate boards, political committees, and other teams is increasing, in part because of legal mandates. Data on team dynamics and gender differences in preferences (risk-taking behavior, taste for competition, prosocial behavior) show how gender composition influences group decision-making and subsequent performance through channels such as investment decisions, internal management, corporate governance, and social responsibility.

  13. Trust in agile teams

    DEFF Research Database (Denmark)

    Tjørnehøj, Gitte; Fransgård, Mette; Skalkam, Signe

    2012-01-01

    actions influenced this. We see two important lessons from the analysis. First the agile practices of daily Scrum and self organizing team can empower DSD teams to manage their own development of trust and thereby alleviate the obstacles of DSD. Second if management fails to support the development...

  14. Psychological Safety and Norm Clarity in Software Engineering Teams

    OpenAIRE

    Lenberg, Per; Feldt, Robert

    2018-01-01

    In the software engineering industry today, companies primarily conduct their work in teams. To increase organizational productivity, it is thus crucial to know the factors that affect team effectiveness. Two team-related concepts that have gained prominence lately are psychological safety and team norms. Still, few studies exist that explore these in a software engineering context. Therefore, with the aim of extending the knowledge of these concepts, we examined if psychological safety and t...

  15. Making star teams out of star players.

    Science.gov (United States)

    Mankins, Michael; Bird, Alan; Root, James

    2013-01-01

    Top talent is an invaluable asset: In highly specialized or creative work, for instance, "A" players are likely to be six times as productive as "B" players. So when your company has a crucial strategic project, why not multiply all that firepower and have a team of your best performers tackle it? Yet many companies hesitate to do this, believing that all-star teams don't work: Big egos will get in the way. The stars won't be able to work with one another. They'll drive the team Leader crazy. Mankins, Bird, and Root of Bain & Company believe it's time to set aside that thinking. They have seen all-star teams do extraordinary work. But there is a right way and a wrong way to organize them. Before you can even begin to assemble such a team, you need to have the right talent management practices, so you hire and develop the best people and know what they're capable of. You have to give the team appropriate incentives and leaders and support staffers who are stars in their own right. And projects that are ill-defined or small scale are not for all-star teams. Use them only for critical missions, and make sure their objectives are clear. Even with the right setup, things can still go wrong. The wise executive will take steps to manage egos, prune non-team-players, and prevent average coworkers from feeling completely undervalued. She will also invest a lot of time in choosing the right team Leader and will ask members for lots of feedback to monitor how that leader is doing.

  16. Technology Applications Team: Applications of aerospace technology

    Science.gov (United States)

    1993-01-01

    Highlights of the Research Triangle Institute (RTI) Applications Team activities over the past quarter are presented in Section 1.0. The Team's progress in fulfilling the requirements of the contract is summarized in Section 2.0. In addition to our market-driven approach to applications project development, RTI has placed increased effort on activities to commercialize technologies developed at NASA Centers. These Technology Commercialization efforts are summarized in Section 3.0. New problem statements prepared by the Team in the reporting period are presented in Section 4.0. The Team's transfer activities for ongoing projects with the NASA Centers are presented in Section 5.0. Section 6.0 summarizes the status of four add-on tasks. Travel for the reporting period is described in Section 7.0. The RTI Team staff and consultants and their project responsibilities are listed in Appendix A. The authors gratefully acknowledge the contributions of many individuals to the RTI Technology Applications Team program. The time and effort contributed by managers, engineers, and scientists throughout NASA were essential to program success. Most important to the program has been a productive working relationship with the NASA Field Center Technology Utilization (TU) Offices. The RTI Team continues to strive for improved effectiveness as a resource to these offices. Industry managers, technical staff, medical researchers, and clinicians have been cooperative and open in their participation. The RTI Team looks forward to continuing expansion of its interaction with U.S. industry to facilitate the transfer of aerospace technology to the private sector.

  17. When Teams Fail to Self-Regulate: Predictors and Outcomes of Team Procrastination Among Debating Teams

    Science.gov (United States)

    Van Hooft, Edwin A. J.; Van Mierlo, Heleen

    2018-01-01

    Models of team development have indicated that teams typically engage in task delay during the first stages of the team’s life cycle. An important question is to what extent this equally applies to all teams, or whether there is variation across teams in the amount of task delay. The present study introduces the concept of team procrastination as a lens through which we can examine whether teams collectively engage in unplanned, voluntary, and irrational delay of team tasks. Based on theory and research on self-regulation, team processes, and team motivation we developed a conceptual multilevel model of predictors and outcomes of team procrastination. In a sample of 209 student debating teams, we investigated whether and why teams engage in collective procrastination as a team, and what consequences team procrastination has in terms of team member well-being and team performance. The results supported the existence of team procrastination as a team-level construct that has some stability over time. The teams’ composition in terms of individual-level trait procrastination, as well as the teams’ motivational states (i.e., team learning goal orientation, team performance-approach goal orientation in interaction with team efficacy) predicted team procrastination. Team procrastination related positively to team members’ stress levels, especially for those low on trait procrastination. Furthermore, team procrastination had an indirect negative relationship with team performance, through teams’ collective stress levels. These findings add to the theoretical understanding of self-regulatory processes of teams, and highlight the practical importance of paying attention to team-level states and processes such as team goal orientation and team procrastination. PMID:29674991

  18. When Teams Fail to Self-Regulate: Predictors and Outcomes of Team Procrastination Among Debating Teams

    Directory of Open Access Journals (Sweden)

    Edwin A. J. Van Hooft

    2018-04-01

    Full Text Available Models of team development have indicated that teams typically engage in task delay during the first stages of the team’s life cycle. An important question is to what extent this equally applies to all teams, or whether there is variation across teams in the amount of task delay. The present study introduces the concept of team procrastination as a lens through which we can examine whether teams collectively engage in unplanned, voluntary, and irrational delay of team tasks. Based on theory and research on self-regulation, team processes, and team motivation we developed a conceptual multilevel model of predictors and outcomes of team procrastination. In a sample of 209 student debating teams, we investigated whether and why teams engage in collective procrastination as a team, and what consequences team procrastination has in terms of team member well-being and team performance. The results supported the existence of team procrastination as a team-level construct that has some stability over time. The teams’ composition in terms of individual-level trait procrastination, as well as the teams’ motivational states (i.e., team learning goal orientation, team performance-approach goal orientation in interaction with team efficacy predicted team procrastination. Team procrastination related positively to team members’ stress levels, especially for those low on trait procrastination. Furthermore, team procrastination had an indirect negative relationship with team performance, through teams’ collective stress levels. These findings add to the theoretical understanding of self-regulatory processes of teams, and highlight the practical importance of paying attention to team-level states and processes such as team goal orientation and team procrastination.

  19. APPLICATION OF FUZZY ANALYTIC HIERARCHY PROCESS TO BUILDING RESEARCH TEAMS

    Directory of Open Access Journals (Sweden)

    Karol DĄBROWSKI

    2016-01-01

    Full Text Available Building teams has a fundamental impact for execution of research and development projects. The teams appointed for the needs of given projects are based on individuals from both inside and outside of the organization. Knowledge is not only a product available on the market but also an intangible resource affecting their internal and external processes. Thus it is vitally important for businesses and scientific research facilities to effectively manage knowledge within project teams. The article presents a proposal to use Fuzzy AHP (Analytic Hierarchy Process and ANFIS (Adaptive Neuro Fuzzy Inference System methods in working groups building for R&D projects on the basis of employees skills.

  20. Application of Fuzzy Analytic Hierarchy Process to Building Research Teams

    Science.gov (United States)

    Dąbrowski, Karol; Skrzypek, Katarzyna

    2016-03-01

    Building teams has a fundamental impact for execution of research and development projects. The teams appointed for the needs of given projects are based on individuals from both inside and outside of the organization. Knowledge is not only a product available on the market but also an intangible resource affecting their internal and external processes. Thus it is vitally important for businesses and scientific research facilities to effectively manage knowledge within project teams. The article presents a proposal to use Fuzzy AHP (Analytic Hierarchy Process) and ANFIS (Adaptive Neuro Fuzzy Inference System) methods in working groups building for R&D projects on the basis of employees skills.