WorldWideScience

Sample records for project success final

  1. Successful Control of Major Project Budgets

    Directory of Open Access Journals (Sweden)

    Steen Lichtenberg

    2016-07-01

    Full Text Available This paper differs from scientific papers describing current research. In line with the theme of this special issue, it challenges conventional risk management practice against the background of former research results successfully finished decades ago. It is well-known that conventional practice frequently results in budget overruns of large projects. International reviews document that. Severe delays of schedules are also well-known. This paper describes successful research results from almost three decades ago, which successfully challenges this severe problem and has led to new practices. The research involved is an unusual mix: Scandinavian researchers from psychology, statistical theory and engineering economy. The resulting procedure has been widely used since around 1990 and challenges conventional procedures. The procedure is documented to be able to yield statistically correct prognoses, when the “rules of the game” have been correctly followed. After a short summary of the basic situation, this paper summarizes the research, followed by some resulting experiences, focusing on two recent studies each of 40 infrastructures and other major projects. In both sets, the actual final cost largely equaled the expected project cost. This result is a marked change from international past and present experience. Finally, the need for further research and progress is discussed.

  2. Relationships between Leadership and Success in Different Types of Project Complexities

    OpenAIRE

    Müller, Ralf; Geraldi, Joana; Turner, Rodney J.

    2012-01-01

    This is the accepted, refereed and final manuscript to the article We investigate the moderating effect of project complexity on the relationship between leadership competences of project managers and their success in projects. Building on existing studies in leadership and project management we assess the impact of emotional (EQ), intellectual (IQ) and managerial (MQ) leadership competences on project success in different types of project complexities. A cross-sectional survey using the ...

  3. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  4. Successful project management

    CERN Document Server

    Young, Trevor L

    2016-01-01

    Successful Project Management, 5th edition, is an essential guide for anyone who wants to improve the success rate of their projects. It will help managers to maintain a balance between the demands of the customer, the project, the team and the organization. Covering the more technical aspects of a project from start to completion it contains practised and tested techniques, covering project conception and start-up, how to manage stake holders, effective risk management, project planning and launch and execution. Also including a brand new glossary of key terms, it provides help with evaluating your project as well as practical checklists and templates to ensure success for any ambitious project manager. With over one million copies sold, the hugely popular Creating Success series covers a wide variety of topic, with the latest editions including new chapters such as Tough Conversations and Treating People Right. This indispensable business skills collection is suited to a variety of roles, from someone look...

  5. Project Success in Agile Development Software Projects

    Science.gov (United States)

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  6. The Project of Success

    DEFF Research Database (Denmark)

    Kreiner, Kristian

    more complicated matter than meeting targets. While success may ultimately be justified in terms of a correspondence between aims and achievements, the understanding of both aspects is highly dependent on the project process. An example of a successful project that did not meet the original performance...... targets will serve to show that success is at matter of perspective as much as it is a matter of achievement. Other types of research, e.g. social psychology, have addressed the issue of success more explicitly. I draw on such literature to conceptualize project success anew and to reestablish...

  7. Perspectives on projects, project success and team work

    OpenAIRE

    Thompson, Karen

    2015-01-01

    This paper brings together perspectives on projects, project success and team work as a background to two graphical tools for considering project success and individual capabilities for working in a project team.

  8. Students Upgrading through Computer and Career Education System Services (Project SUCCESS). Final Evaluation Report 1992-93. OER Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn, NY. Office of Educational Research.

    Student Upgrading through Computer and Career Education System Services (Project SUCCESS) was an Elementary and Secondary Education Act Title VII-funded project in its third year of operation. Project SUCCESS served 460 students of limited English proficiency at two high schools in Brooklyn and one high school in Manhattan (New York City).…

  9. Project Management Yinyang: Coupling project success and client satisfaction

    Directory of Open Access Journals (Sweden)

    Greg Stewart Usher

    2017-06-01

    Full Text Available Our research applies paradox theory to a project management construct to help project management researchers and practitioners understand the tensions that can exist between project success and client satisfaction. Our research highlights that although project success and client satisfaction are both present within a project management construct, they also belong to different functional systems. Project success and client satisfaction have different systemic-discourses and use different language games to convey information. These distinctions can create latent and sometimes salient tensions within the project management construct that project managers must understand, embrace, and work with. We have used a Grounded Theory (GT methodology to explore the lived experience of project managers, and from this have identified a phenomenon which we have termed project management yinyang. Project management yinyang is the state that exists when both project success and Client satisfaction are tightly coupled within the project management construct. Project management yinyang highlights that these two phenomena cannot be viewed as separate elements because the ‘seed’ of each exists within the other. And to truly achieve one, you must also achieve the other. Our findings indicate that in order to create project management yinyang the project manager must embrace a paradoxical yet holistic philosophy. They must understand the complementarity, interdependency, and structural coupling that exists between the positivist and interpretivist paradigms within the project management construct. They must understand how satisfaction (Yin and success (Yang are created through focus. Furthermore, they must understand how project management yinyang is separate from, but borne from, the convergence of the other two elements.

  10. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    Science.gov (United States)

    Alagba, Tonye J.

    Oil and gas drilling projects are the primary means by which oil companies recover large volumes of commercially available hydrocarbons from deep reservoirs. These types of projects are complex in nature, involving management of multiple stakeholder interfaces, multidisciplinary personnel, complex contractor relationships, and turbulent environmental and market conditions, necessitating the application of proven project management best practices and critical success factors (CSFs) to achieve success. Although there is some practitioner oriented literature on project management CSFs for drilling projects, none of these is based on empirical evidence, from research. In addition, the literature has reported alarming rates of oil and gas drilling project failure, which is attributable not to technical factors, but to failure of project management. The aim of this quantitative correlational study therefore, was to discover an empirically verified list of project management CSFs, which consistent application leads to successful implementation of oil and gas drilling projects. The study collected survey data online, from a random sample of 127 oil and gas drilling personnel who were members of LinkedIn's online community "Drilling Supervisors, Managers, and Engineers". The results of the study indicated that 10 project management factors are individually related to project success of oil and gas drilling projects. These 10 CSFs are namely; Project mission, Top management support, Project schedule/plan, Client consultation, Personnel, Technical tasks, Client acceptance, Monitoring and feedback, Communication, and Troubleshooting. In addition, the study found that the relationships between the 10 CSFs and drilling project success is unaffected by participant and project demographics---role of project personnel, and project location. The significance of these findings are both practical, and theoretical. Practically, application of an empirically verified CSFs list to oil

  11. Critical success factors in infrastructure projects

    Science.gov (United States)

    Zakaria, Siti Fairus; Zin, Rosli Mohamad; Mohamad, Ismail; Balubaid, Saeed; Mydin, Shaik Hussein; Mohd Rahim, E. M. Roodienyanto

    2017-11-01

    Construction of infrastructure project is different from buildings. The main difference is term of project site where infrastructure project need to command a long stretch while building mostly confine to a limited area. As such factors that are critical to infrastructure project may not be that significant to building project and vice versa. Flood mitigation can be classified under infrastructure projects under which their developments are planned by the government with the specific objective to reduce or avoid the negative effects of flood to the environment and livelihood. One of the indicators in project success is delay. The impact of project delay in construction industry is significant that it decelerates the projects implementation, specifically the government projects. This study attempted to identify and compare the success factors between infrastructure and building projects, as such comparison rarely found in the current literature. A model of flood mitigation projects' success factors was developed by merging the experts' views and reports from the existing literature. The experts' views were obtained from the responses to open-ended questions on the required fundamentals to achieve successful completion of flood mitigation projects. An affinity analysis was applied to these responses to develop the model. The developed model was then compared to the established success factors found in building project, extracted from the previous studies to identify the similarities and differences between the two models. This study would assist the government and construction players to become more effective in constructing successful flood mitigation projects for the future practice in a flood-prone country like Malaysia.

  12. Determining Success Criteria and Success Factors for International Construction Projects for Malaysian Contractors

    Directory of Open Access Journals (Sweden)

    Ali Mohammed Alashwal

    2017-06-01

    Full Text Available The success of international construction projects is fraught with various challenges such as competitiveness, lack of resources, versatile global economy, and specific conditions in the host country. Malaysian contractors have been venturing into global construction market since early 1980s. However, their venturing was not successful all the time. The number of international projects awarded to Malaysian contractors has reduced drastically during the past decade. Taking advantage of this experience, this paper aims to identify the success criteria and success factors of international construction projects. The data was collected from 120 respondents using a questionnaire survey and analysed using principal component analysis and regression analysis. The results revealed three principal criteria of project success namely, Management Success, Functional Success, and Organisation Success. The main components of success factors include Team Power and Skills, Resource Availability, External Environment, Organisation Capability, Project Support, and Project Organisation. Further analysis emphasized the importance of strong financing capacity of contractors, project social environment, and competence of the project manager in achieving project success. The results of this paper can serve as a guideline for contractors and project managers to achieve success in this context. Future studies may provide in-depth analysis of success criteria and success factors specific for construction project type and host-country location.

  13. Vague project start makes project success of outsourced software development projects uncertain

    OpenAIRE

    Savolainen, Paula

    2010-01-01

    peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...

  14. Relationships and project marketing success

    DEFF Research Database (Denmark)

    Skaates, Maria Anne; Tikkanen, Henrikki; Lindblom, Jarno

    2002-01-01

    Project operations are a dominating mode of international business. Managing relationships and networks is crucial to project marketing success both at the level of the individual project and at the level of multiple projects. This article first defines key characteristics of project business, id...

  15. Critical success factors in information technology projects

    Directory of Open Access Journals (Sweden)

    Ayesha

    2017-02-01

    Full Text Available The purpose of this study is to determine the critical success factors (CSF of IT projects in Pa-kistan. The identified factors cannot only be functional to exact type IT projects but also to all types of IT projects, their success directly affects the achievement of whole organization. The proposed study of this paper has determined 15 factors influencing the most on the success of IT projects through multiple regression analysis. The survey has disclosed that many CSFs were found related to IT projects but these 15 factors are also the backbone of IT projects. The re-search results obtained clearly indicated that the Leadership Qualities played a significant role in obtaining Top Management support in order to access to resources however, the Leadership Qualities did not play any role on the trained and capable Project Team Members. Besides, it is undoubtedly defined effective communication of the project was established to be influential on the conclusion and contributing factor towards the Success of IT projects in Pakistan. Top Man-agement Support as a whole was not found to play a key role in the IT Project Success.

  16. The Impact of Project Manager on Project Success – The Case of ICT Sector

    OpenAIRE

    Blaskovics, Bálint

    2016-01-01

    The project management literature on project success is rich. Numerous papers focus on the evolution of the understanding of project success, identification of success criteria and critical success factors. Critical success factors increase the potential for achieving project success, while project success can be evaluated with the help of success criteria. Although the interrelationships between critical success factors and success criteria are rarely analyzed, yet there is a strong demand f...

  17. Students Upgrading through Computer and Career Education System Services (Project SUCCESS). Final Evaluation Report 1993-94. OER Report.

    Science.gov (United States)

    Greene, Judy

    Students Upgrading through Computer and Career Education System Services (Project SUCCESS) was an Elementary and Secondary Education Act Title VII-funded project in its fourth year of operation. The project operated at two high schools in Brooklyn and one in Manhattan (New York). In the 1993-94 school year, the project served 393 students of…

  18. The Students Upgrading through Computer and Career Education Systems Services (Project SUCCESS). 1990-91 Final Evaluation Profile. OREA Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.

    An evaluation was done of the New York City Public Schools' Student Upgrading through Computer and Career Education Systems Services Program (Project SUCCESS). Project SUCCESS operated at 3 high schools in Brooklyn and Manhattan (Murry Bergtraum High School, Edward R. Murrow High School, and John Dewey High School). It enrolled limited English…

  19. Key performance indicators for successful simulation projects

    OpenAIRE

    Jahangirian, M; Taylor, SJE; Young, T; Robinson, S

    2016-01-01

    There are many factors that may contribute to the successful delivery of a simulation project. To provide a structured approach to assessing the impact various factors have on project success, we propose a top-down framework whereby 15 Key Performance Indicators (KPI) are developed that represent the level of successfulness of simulation projects from various perspectives. They are linked to a set of Critical Success Factors (CSF) as reported in the simulation literature. A single measure cal...

  20. Final Project Report Project 10749-4.2.2.1 2007-2009

    Energy Technology Data Exchange (ETDEWEB)

    Zacher, Alan H.; Holladay, Johnathan E.; Frye, J. G.; Brown, Heather M.; Santosa, Daniel M.; Oberg, Aaron A.

    2009-05-11

    This is the final report for the DOE Project 10749-4.2.2.1 for the FY2007 - FY2009 period. This report is non-proprietary, and will be submitted to DOE as a final project report. The report covers activities under the DOE Project inside CRADA 269 (Project 53231) as well as project activites outside of that CRADA (Project 56662). This is the final report that is summarized from the non-proprietary quarterlies submitted to DOE over the past 2.5 years, which in turn are summaries from the proprietary technical reporting to UOP.

  1. Impact of Stakeholder Psychological Empowerment on Project Success

    Directory of Open Access Journals (Sweden)

    Herry Pintardi Chandra

    2011-05-01

    Full Text Available The relationship between psychological empowerment of stakeholders and project success is an important thing that must be known by project manager. This research developed and tested the model to predict how well the impact of stakeholder psychological empowerment on project success. Stakeholder psychological empowerment was defined to have five indicator variables covering intrinsic motivation, opportunity to perform, ability to perform, task behaviors, and contextual behaviors. Meanwhile, project success can be measured by cost performance, time performance, quality performance, profitability, and customer satisfaction. In this study, it was hypothesized that stakeholder psychological empowerment influenced project success. Based on the data obtained from a questionnaire survey carried out to 204 respondents, structural equation modeling (SEM was used for predicting the performance of project success. It was found that stakeholder psychological empowerment influenced project success, especially on the ability to perform of stakeholders.

  2. Project manager attributes influencing project success in the South ...

    African Journals Online (AJOL)

    success criteria for building projects in Ghana and concluded that the “current and ... qualifications, profession, leadership style and project team ... and expectations of project management competence between ... 1.d. Sense of teamwork ...

  3. Critical success factors for BOT electric power projects in China: Thermal power versus wind power

    Energy Technology Data Exchange (ETDEWEB)

    Zhao, Zhen-Yu. [School of Business Administration, North China Electric Power University, Beijing 102206 (China); Zuo, Jian; Zillante, George [School of Natural and Built Environments, University of South Australia, Adelaide 5001 (Australia); Wang, Xin-Wei [Shandong Nuclear Power Equipment Manufacturing Co. Ltd, Haiyang, Shandong 265118 (China)

    2010-06-15

    Chinese electric power industry has adopted Build-Operate-Transfer (BOT) approach in a number of projects to alleviate the pressure of sole state-owned investment. The Chinese government has taken enormous efforts to create an environment to facilitate the application of BOT approach in electric power projects. Moreover, the growing attention on the sustainability issues puts the traditional major source of electricity - thermal power project under more strict scrutiny. As a result, various renewable energy projects, particularly the wind power projects have involved private sector funds. Both thermal power and wind power projects via BOT approach have met with a varying degree of success. Therefore, it is imperative to understand the factors contributing towards the success of both types of BOT power projects. Using an extensive literature survey, this paper identifies 31 success factors under 5 categories for Chinese BOT electric power projects. This is followed by a questionnaire survey to exam relative significance of these factors. The results reveal the different levels of significance of success factors for BOT thermal power projects versus wind power projects. Finally, survey results were analyzed to explore the underlying construction and distributions among the identified success factors. This study provides a valuable reference for all involved parties that are interested in developing BOT electric power projects in China. (author)

  4. Critical Success Factors in Construction Projects (Governmental Projects as a Case Study)

    OpenAIRE

    Hatem Khaleefah Al-Ageeli; Abdul Salam J. Ali Alzobaee

    2016-01-01

    The importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A select...

  5. Leadership and Project Success in Development Sector

    Directory of Open Access Journals (Sweden)

    Saghir Ahmed

    2017-10-01

    Full Text Available Aim/purpose - The study aims to investigate the relationship among the leadership, operational efficiency and project success in general and the impact of transformational leadership and operational efficiency on project success in particular. Design/methodology/approach - Mean comparison from descriptive statistics and multiple linear regression from inferential statistics was used to determine the association between variables and further impact of the transformational leadership and operational efficiency on project success in the development sector. The paper presents the results of a survey conducted among 200 employees from the top, middle & lower management levels of various national & international development organizations working in Pakistan like Microfinance Banks and other Rural Support Programs. Statistical Package for Social Sciences (SPSS was used to process data. Findings - The result shows positive association among transformational leadership, operational efficiency and project success. In addition, it was found that transformational leadership and operational efficiency have a positive and statistically significant impact on the project success. It is concluded that both transformational leadership and operational efficiency are vital to achieving the optimum level of success in any project, especially in the development sector. Research implications/limitations - The integral limitation of the study was the respondents because most of the development organizations have their operations in rural areas where access was difficult because of limited time and resources. In addition, such organizations are always reluctant to provide survey feedback. Originality/value/contribution - The paper contribution is in the theoretical and practical knowledge of the project success factors in the development sector which is still a somehow unexplored area. Regulators of the development sector may be benefited from this study.

  6. Effects of Risk Management Practices on IT Project Success

    Directory of Open Access Journals (Sweden)

    Pimchangthong Daranee

    2017-03-01

    Full Text Available Successful management of an information technology (IT project is the most desirable for all organisations and stakeholders. Many researchers elaborated that risk management is a key part of project management for any project size. Risk management is so critical because it provides project managers with a forward-looking view of both threats and opportunities to improve the project success. The objectives of this research are to explore organisational factors affecting IT project success and risk management practices influencing IT project success. Risk management practices include risk identification, risk analysis, risk response planning, and risk monitoring and control. The IT project success is measured by process performance and product performance. Data are collected from 200 project managers, IT managers, and IT analysts in IT firms through questionnaires and analysed using Independent Sample t-test, One-way ANOVA, and Multiple Linear Regression at the statistical significance level of 0.05. The results show that the differences in organisational types affect IT project success in all aspects, while the differences on organisational sizes affect IT project success in the aspect of product performance and total aspects. Risk identification and risk response planning influence the process performance and the total aspects of IT project success. Risk identification has the highest positive influence on product performance, followed closely by risk response, while risk analysis negatively influences product performance.

  7. CRITICAL SUCCESS FACTORS FOR INFRASTRUCTURE EUROPEAN FUNDED PROJECTS

    Directory of Open Access Journals (Sweden)

    Sebastian-Ion Ceptureanu

    2016-07-01

    Full Text Available Absorption of European funds is on top of Romania’s public agenda for the last years although the first programming period has ended and the necessary lessons were learned so far. To have a high degree of absorption of funds provided by the EU must be of quality projects and their implementation to be successful. Through this work we aimed to investigate the success factors of infrastructure projects with European funding in Romania, Bulgaria, Moldova, Ukraine, Serbia and Kosovo, and identify critical success factors of these projects through a research surveying the teams of consultants and support personnel from the countries in an international consulting company. The research results are therefore constitute the empirical evidence of what constitutes critical success factors of infrastructure projects financed by the European Union and can be used as a starting point for scientific studies of the management of European projects or other actions that investigates measures that can be taken to improve the success rate of projects implemented in the area mentioned above.One of the contributions of this paper is to identify the critical success factors of success factors present in literature. With more so as they are critical success factors of infrastructure projects with European funding still required field studies and analysis performed in the present context. In addition, the critical factors were operationalized in a conceptual framework. Moreover, this framework includes leadership style of project manager as critical success factor has been identified in the research as the most important in the context in which it was conducted. As such, this paper demonstrates, with the necessary limitations, the importance of management style of project managers in the context of specific European funded infrastructure projects. And this is happening even though there are sophisticated project management tools availabe and relevant knowledge exists

  8. Critical Success Factors in Construction Projects (Governmental Projects as a Case Study

    Directory of Open Access Journals (Sweden)

    Hatem Khaleefah Al-Ageeli

    2016-03-01

    Full Text Available The importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A selected 75 engineer (department managers, project managers and engineers are asked to fill the questionnaire form, Sixty-seven valid questionnaire forms were analyzed statistically to get search results, which were as follows : Twelve critical success factors, the most important factors of it were ("contractor financial efficiency ", " security ,political , economic stability ", "the project manager competence" and " Integration and clarity of contract documents " , thirteen critical failure factors, the most important factors of it were ("corruption " , " external circumstances ", "Financial difficulties of owner", and ten success criteria , the most important criteria of it were ("within allocated budget" , " within time period" , "Quality" .

  9. Structuring lighting retrofit projects for success

    International Nuclear Information System (INIS)

    Fetters, J.L.

    1993-01-01

    Several trends are converging to create a substantial market for lighting retrofits in these uncertain economic times. Low interest rates are making investments in buildings more attractive than alternative financial investments such as CD's. With activity in the new construction market at an all time low, savvy contractors are turning to the retrofit market - restoring, renovating and upgrading existing buildings. Heightened environmental concerns are fueling lighting incentive programs from the electric utilities and the EPA. Improvements in lighting technology are arriving in the marketplace at an accelerated rate. Building occupants are demanding higher quality workplaces and managers are seeking higher levels of productivity. Replacing older lighting equipment can substantially improve lighting efficiency, decrease energy and maintenance costs and, at the same time, improve the workplace by increasing lighting quality Lighting retrofit projects have a demonstrated track record, reducing lighting costs on the order of 50%. This experience can be applied to help structure retrofit projects. But, in order to reap all the benefits available from a retrofit project, it must be structured for success. The retrofit option introduces a unique series of issues for building owners, managers and engineers. The best way to prevent these issues from undermining the success of retrofit projects is to anticipate and completely plan for them. Successful retrofit projects run smoothER and stay within budgetary constraints. Three important considerations will guide the successful project: (1) Start comprehensive planning early, (2) Investigate existing conditions, and (3) Be sensitive to owner/occupants needs keep building operational

  10. Wisdom for Building the Project Manager/Project Sponsor Relationship: Partnership for Project Success

    National Research Council Canada - National Science Library

    Patton, Nanette; Shechet, Allan

    2007-01-01

    .... This article discusses conventional roles and responsibilities of the project sponsor and then discusses strategies a project manager can employ to define boundaries to reduce role confusion and promote partnership to facilitate project success.

  11. Influence of organizational and project cultures on project success

    Directory of Open Access Journals (Sweden)

    Berdykulova G. M.

    2017-10-01

    Full Text Available the article is dedicated to studying the influence of organizational and project cultures on effective project management of the company by knowledge systematization and the comparative analysis of world companies’ practice that allowed to reveal the main factors and criteria of projects success and negative influence of organizational culture on the project; key aspects of corporate culture and cultural integration under the conditions of globalization.

  12. What drives continuous improvement project success in healthcare?

    Science.gov (United States)

    Stelson, Paul; Hille, Joshua; Eseonu, Chinweike; Doolen, Toni

    2017-02-13

    Purpose The purpose of this paper is to present findings from a study of factors that affect continuous improvement (CI) project success in hospitals. Design/methodology/approach Quantitative regression analysis was performed on Likert scale survey responses. Qualitative thematic analysis was performed on open-ended survey responses and written reports on CI projects. Findings The paper identifies managerial and employee factors that affect project success. These factors include managerial support, communication, and affective commitment. Affective commitment is the extent to which employees perceive the change as being needed or necessary. Practical implications The results highlight how managerial decisions, approaches to communication - including communication before, during and after CI projects affect project success. The results also show that success depends on the way employees perceive proposed changes. This suggests the need for a more individualized approach to CI, lean, and broader change initiatives. Originality/value This research is the first to fuse project success and sustainability theory to CI projects, beyond Kaizen events, in healthcare environments. The research is particularly important at a time when healthcare organizations are required to make rapid changes with limited resources as they work toward outcome-based assessment and reimbursement rules.

  13. The Role of the Project Management Office on Information Technology Project Success

    Science.gov (United States)

    Stewart, Jacob S.

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. Assessing critical success factors is another…

  14. Determinants of construction project success in India

    CERN Document Server

    Jha, Kumar Neeraj

    2013-01-01

    This study presents exploratory work and seeks to identify and evaluate the success and failure factors that could form a guideline for further study and to some extent help professionals to understand some critical aspects that impact project performance concerning construction in India. A total of 55 attributes affecting the performance of construction projects are analysed in terms of their level of influence on four key performance criteria – schedule, cost, quality, and no disputes – using a two-stage questionnaire survey. These attributes are then further analysed, interpreted and evaluated.   Based on the critical success factors obtained from the study, a neural network model-based predictive model for project performance has been developed. The performance prediction models have been derived for all four project performance criteria. Further, a hypothesis that ‘project success’ is influenced by ‘success traits’ has also been formulated. The hypothesized positive inter-relationships betwe...

  15. Risk managements' communicative effects influencing IT project success

    NARCIS (Netherlands)

    de Bakker, Karel; Boonstra, Albert; Wortmann, Hans

    The central question of this research is if, and how, risk management contributes to the success of IS/IT projects. Risk management is used regularly in IT projects, despite indications in literature that risk management only occasionally contributes to IT project success. Drawing on Habermas we

  16. Understanding Megaproject Success beyond the Project Close-Out Stage

    Directory of Open Access Journals (Sweden)

    Johan Fahri

    2015-08-01

    Full Text Available Project success has always been an important topic in the project management literature. One of the main discussions is concerned with how a project’s success is evaluated and what factors lead to achieving this success. Traditionally project success has been measured at the point where the project outputs are handed over, after the close out phase. Recently, questions have been raised in the literature as to whether we should be evaluating project success beyond the close out phase, to better account for organizational and societal outcomes.  However, not much has been published about how the long term impacts and outcomes are measured. This is of particular concern in megaprojects as they often attract a high level of public attention and political interest, and have both direct and indirect impacts on the community, environment, and national budgets. In this paper the authors review success factors and criteria that are applicable to projects in general and megaprojects in particular. They identify the significance of evaluating outcomes and impact and propose an ex-post project evaluation (EPPE framework for megaprojects.

  17. The IT project manager competencies that impact project success – A qualitative research

    Directory of Open Access Journals (Sweden)

    Cíntia Cristina Silva de Araújo

    2015-07-01

    Full Text Available Since there is a lack of studies about the relationship of IT project manager competencies and project success, this paper will address the following research question: Which competencies should IT project managers develop in order to achieve success in IT projects? To answer this question, we conducted a qualitative research with an exploratory approach. To collect data, twelve (12 in-depth interviews were done with Brazilian project managers from different companies from several business sectors. The analysis results pointed out that for our respondents the most needed category of competencies are team management, business domain knowledge,  communication, project management and people skills. As other authors have affirmed, technical skills were considered to be less relevant to project success than interpersonal and intrapersonal competencies.

  18. Ranking the Project Management Success Factors for Construction Project in South India

    Science.gov (United States)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  19. Project description and crowdfunding success: an exploratory study.

    Science.gov (United States)

    Zhou, Mi Jamie; Lu, Baozhou; Fan, Weiguo Patrick; Wang, G Alan

    2018-01-01

    Existing research on antecedent of funding success mainly focuses on basic project properties such as funding goal, duration, and project category. In this study, we view the process by which project owners raise funds from backers as a persuasion process through project descriptions. Guided by the unimodel theory of persuasion, this study identifies three exemplary antecedents (length, readability, and tone) from the content of project descriptions and two antecedents (past experience and past expertise) from the trustworthy cue of project descriptions. We then investigate their impacts on funding success. Using data collected from Kickstarter, a popular crowdfunding platform, we find that these antecedents are significantly associated with funding success. Empirical results show that the proposed model that incorporated these antecedents can achieve an accuracy of 73 % (70 % in F-measure). The result represents an improvement of roughly 14 percentage points over the baseline model based on informed guessing and 4 percentage points improvement over the mainstream model based on basic project properties (or 44 % improvement of mainstream's performance over informed guessing). The proposed model also has superior true positive and true negative rates. We also investigate the timeliness of project data and find that old project data is gradually becoming less relevant and losing predictive power to newly created projects. Overall, this study provides evidence that antecedents identified from project descriptions have incremental predictive power and can help project owners evaluate and improve the likelihood of funding success.

  20. Project management practice and its effects on project success in Malaysian construction industry

    Science.gov (United States)

    Haron, N. A.; Devi, P.; Hassim, S.; Alias, A. H.; Tahir, M. M.; Harun, A. N.

    2017-12-01

    The rapid economic development has increased the demand for construction of infrastructure and facilities globally. Sustainable development and globalization are the new ‘Zeitgeist’ of the 21st century. In order to implement these projects successfully and to meet the functional aim of the projects within their lifetime, an efficient project management practice is needed. The aim of this study is to identify the critical success factors (CSFs) and the extent of use of project management practice which affects project success, especially during the implementation stage. Data were obtained from self-administered questionnaires with 232 respondents. A mixed method of data collection was adopted using semi-structured interview and questionnaire approach. The result of the analysis of data obtained showed that new and emerging criteria such as customer satisfaction, competency of the project team, and performance of subcontractors/suppliers are becoming measures of success in addition to the classic iron triangle’s view of time, cost and quality. An insight on the extent of use of different project management practice in the industry was also achieved from the study.

  1. Critical success factors for renewable energy projects

    International Nuclear Information System (INIS)

    1995-01-01

    This project highlighted best practice in the planning and assessment of proposals with the aim of: encouraging more successful renewable energy projects and proposals; lowering financial and other barriers; and stimulating a climate for success. Based on the analysis of a number of case studies, data was collected through a series of extensive interviews to identify why certain schemes were considered successful, what might have been done differently and which factors were considered important when entering a market. The Critical Success Factors can be broken down into five groups: Universal CSFs; CSFs for funding bodies; CSFs for managing agencies; CSFs for niche markets; CSFs for individual technologies. (author)

  2. Pac-Rim LNG project : final project report specifications

    International Nuclear Information System (INIS)

    1996-01-01

    PAC-RIM LNG Inc. has submitted a proposal to the British Columbia Environmental Assessment Office, to develop a liquefied natural gas project which would purchase pipeline quality natural gas from sources in northeast British Columbia and Alberta and transport it via a dedicated pipeline system to a LNG processing plant on tidewater on the Pacific coast. The project would include storage and processing facilities and a marine loading terminal. This document sets out the final project report specifications prepared by the Project Committee on the basis of input received from the public, First Nations and federal, provincial and local governments

  3. Manitoba Motor Dealers Association pilot project : final report

    International Nuclear Information System (INIS)

    2006-08-01

    This report described a 3-month pilot project conducted by EnerGuide for Vehicles in collaboration with the Manitoba Motor Dealers Association (MMDA) to increase dealership and consumer awareness of vehicle impacts on climate change. The project also aimed to engage MMDA's members in helping to promote and distribute information on fuel efficient vehicles and fuel efficient driving habits. Program tools in both the dealership showroom as well as service areas were used. Objectives of the project also included gaining public opinion research (POR) information regarding the impact of program tools; gaining feedback from new car dealers regarding the success of the project; gauging customer perceptions of the importance of fuel efficiency when selecting a new vehicle; determining whether or not drivers verify tire pressure on their vehicles; determining whether or not drivers incorporate energy efficient driving habits; and gauging customer perceptions regarding the importance of incorporating behaviours to improve fuel efficiency. The study used a mixed methodology of online and telephone surveys. A total of 41 dealerships participated in the project. The final sample of surveys consisted of 1926 customer records. The total overall number of completed interviews was 463. Results indicated that most dealers believed the campaign was a success, and that staff and customers learned about energy efficiency as a result of the campaign. Seventy-five per cent of dealers agreed that they would participate in future energy efficiency programs. Campaign materials and customer incentives were widely viewed as successful in raising awareness. Seven in 10 dealership customers recalled at least 1 of the promotional endeavours, and a large majority of customers indicated the information they saw at the dealership encouraged them to consider fuel efficiency when buying or maintaining a vehicle in the future. The majority of new customers considered fuel consumption to be the second

  4. Servant leadership behaviors of aerospace and defense project managers and their relation to project success

    Science.gov (United States)

    Dominik, Michael T.

    The success of a project is dependent in part on the skills, knowledge, and behavior of its leader, the project manager. Despite advances in project manager certifications and professional development, the aerospace and defense industry has continued to see highly visible and expensive project failures partially attributable to failures in leadership. Servant leadership is an emerging leadership theory whose practitioners embrace empowerment, authenticity, humility, accountability, forgiveness, courage, standing back, and stewardship, but has not yet been fully examined in the context of the project manager as leader. The objective of this study was to examine the relationship between servant leadership behaviors demonstrated by aerospace and defense project managers and the resulting success of their projects. Study participants were drawn from aerospace and defense oriented affinity groups from the LinkedInRTM social media web system. The participants rated their project managers using a 30-item servant leadership scale, and rated the success of their project using a 12-item project success scale. One hundred and fifteen valid responses were analyzed from 231 collected samples from persons who had worked for a project manager on an aerospace and defense project within the past year. The results of the study demonstrated statistically significant levels of positive correlation to project success for all eight servant leadership factors independently evaluated. Using multiple linear regression methods, the servant leadership factors of empowerment and authenticity were determined to be substantial and statistically significant predictors of project success. The study results established the potential application of servant leadership as a valid approach for improving outcomes of projects.

  5. Final Project Report

    DEFF Research Database (Denmark)

    Workspace

    2003-01-01

    of the Disappearing Computer to be that of  “Augmenting reality”, where “Augmented reality” meant:  •  Augmented user – positioning, visualising. •  Augmented environment, Panels, tables and site-pack •  Augmented Artifacts - RFID , tagging, tracking •  Augmented communications – efficient exchange and integration......The primary focus of the WORKSPACE project was to augment the working  environment through the development of spatial computing components, initially for  members of the design professions, but with wider applicability to a range of work  domains.     The project interpreted the requirements...... of the above.    The philosophy was to make the computer disappear by both making it large and  embedding it into the environment (e.g. furniture).  The project has successfully achieved its objectives, and has developed a range of  demonstrator prototypes, some of which is in daily use by practitioners within...

  6. Construction Project Success ranking through the Data Envelopment Analysis

    Directory of Open Access Journals (Sweden)

    Mazyar Zahedi-Seresht

    2014-09-01

    Full Text Available The purpose of this paper is to rank construction projects' success in a post delivery phase. To attain this objective, a data envelopment analysis (DEA approach is used. The model's output is a project success index which is calculated based on five project success criteria. These criteria which are determined by a two-round Delphi questionnaire survey are time performance, cost performance, quality, HSE, and customer satisfaction. The input factors which have effects on the output measures are Organizational Sponsorship, Project Manager Competency, Customer Organization, Project Operational Environment and Organizational Experience. The tool adopted to determine these factors is questionnaire. This model is applied for 9 projects with different importance of output and input factors and the reasonable result is achieved for ranking these projects.

  7. Common project energy change. The schedule to the success

    International Nuclear Information System (INIS)

    Bartosch, Ulrich; Hennicke, Peter; Weiger, Hubert

    2014-01-01

    The energy change is the most important common work of the German after-war history. And it offers a unique collective field of learning, how the socio-ecological transformation can be converted in practice. If the energy change succeeds in an industrial country like Germany, many other countries can follow this example. The Bund fuer Umwelt und Naturschutz Deutschland (BUND) and the Vereinigung Deutscher Wissenschaftler (VDW) show as editors, what now must be done in order that the energy change becomes a success. Because currently threatens the energy change to be slowed down by the policy and talked to death by many stakeholders in the industry. This book demonstrates why the energy change is necessary and how it can succeed. It shows what has to be done and wants to use the existing enthusiasm in order to lead the common project energy change jointly to success. What is needed is a long-term policy that finally takes the reduction of energy consumption in attack.

  8. A Model of Successful School Leadership from the International Successful School Principalship Project

    Directory of Open Access Journals (Sweden)

    David Gurr

    2015-03-01

    Full Text Available The International Successful School Principalship Project (ISSPP has been actively conducting research about the work of successful principals since 2001. Findings from four project books and eight models derived from this project are synthesised into a model of successful school leadership. Building on Gurr, Drysdale and Mulford’s earlier model, the work of school leaders is described as engaging within the school context to influence student and school outcomes through interventions in teaching and learning, school capacity building, and the wider context. The qualities a leader brings to their role, a portfolio approach to using leadership ideas, constructing networks, collaborations and partnerships, and utilising accountability and evaluation for evidence-informed improvement, are important additional elements. The model is applicable to all in leadership roles in schools.

  9. Traditional Project Management and the Visual Workplace Environment to Improve Project Success

    Science.gov (United States)

    Fichera, Christopher E.

    2016-01-01

    A majority of large IT projects fail to meet scheduled deadlines, are over budget and do not satisfy the end user. Many projects fail in spite of utilizing traditional project management techniques. Research of project management has not identified the use of a visual workspace as a feature affecting or influencing the success of a project during…

  10. Leadership success within disaster restoration projects.

    Science.gov (United States)

    Rapp, Randy R; Baroudi, Bassam

    2014-01-01

    Successful project managers draw their performance from essential leadership traits, as guided by their core values.Within disaster recovery, contractors who mitigate, repair, and reconstruct the built environment are often faced with challenges exceeding the norm. The effective leader is commonly expected to consider stakeholder motivations within distressing situations as well as other external and environmental factors when seeking to lead the project team to successful outcomes. This research is most concerned with leadership within the context of disaster restoration of the built environment. Its stimulus comes from the Restoration Industry Association (RIA)'s efforts to highlight leadership traits and core values for its Certified Restorer Body of Knowledge but would be of value to others associated with disaster recovery operations. Among organizations whose membership includes thousands of practitioners who restore and reconstruct the built environment after disasters, the RIA is the only one yet to formally and substantially research which core values and leader traits are deemed critical for the success of efforts to manage the means and methods applied on recovery job sites. Forty-six seasoned disaster restoration industry project professionals voluntarily responded to a survey questionnaire that sought their opinions about the traits and core values that they consider most important for successful disaster restoration project leadership. The most important leader traits were effective communication, professional competence, and leadership by example. The most important restoration industry values were integrity, compassion, and trustworthiness. The recognized imperative of compassion was unexpected in light of stereotypes often associated with construction-related contractors. This and other findings permit disaster response and recovery stakeholders to better understand qualities they should wish to see in leaders of contractor organizations, which

  11. Final Project Report for Award ER65581

    Energy Technology Data Exchange (ETDEWEB)

    Stoy, Paul C. [Montana State Univ., Bozeman, MT (United States)

    2017-07-13

    The attached final project report describes contributions of Montana State University (MSU) to the project "Bridging land-surface fluxes and aerosol concentrations to triggering convective rainfall" (PI: Fuentes).

  12. Application fuzzy multi-attribute decision analysis method to prioritize project success criteria

    Science.gov (United States)

    Phong, Nguyen Thanh; Quyen, Nguyen Le Hoang Thuy To

    2017-11-01

    Project success is a foundation for project owner to manage and control not only for the current project but also for future potential projects in construction companies. However, identifying the key success criteria for evaluating a particular project in real practice is a challenging task. Normally, it depends on a lot of factors, such as the expectation of the project owner and stakeholders, triple constraints of the project (cost, time, quality), and company's mission, vision, and objectives. Traditional decision-making methods for measuring the project success are usually based on subjective opinions of panel experts, resulting in irrational and inappropriate decisions. Therefore, this paper introduces a multi-attribute decision analysis method (MADAM) for weighting project success criteria by using fuzzy Analytical Hierarchy Process approach. It is found that this method is useful when dealing with imprecise and uncertain human judgments in evaluating project success criteria. Moreover, this research also suggests that although cost, time, and quality are three project success criteria projects, the satisfaction of project owner and acceptance of project stakeholders with the completed project criteria is the most important criteria for project success evaluation in Vietnam.

  13. Characteristics of Successful Internal Medicine Resident Research Projects: Predictors of Journal Publication Versus Abstract Presentation.

    Science.gov (United States)

    Atreya, Auras R; Stefan, Mihaela; Friderici, Jennifer L; Kleppel, Reva; Fitzgerald, Janice; Rothberg, Michael B

    2018-02-06

    To identify the characteristics of successful research projects at an internal medicine residency program with an established research curriculum. The authors collected data about all research projects initiated by or involving medicine residents from 2006 to 2013 at Baystate Medical Center, using departmental files and institutional review board applications. Resident and mentor characteristics were determined using personnel files and Medline searches. Using multivariable models, the authors identified predictors of successful completion of projects using adjusted prevalence ratios (PRs). The primary outcome was manuscript publication by resident and secondary outcome was either publication or regional/national presentation. Finally, residents were surveyed to identify barriers and/or factors contributing to project completion. Ninety-four research projects were identified: 52 (55.3%) projects achieved the primary outcome and 72 (76.5%) met the secondary outcome, with overlap between categories. Most study designs were cross-sectional (41, 43.6%) or retrospective cohort (30, 31.9%). After adjustment, utilization of the epidemiology/biostatistical core (PR = 2.09; 95% CI: 1.36, 3.21), established publication record of resident (PR = 1.54, 95% CI: 1.14, 2.07), and resident with U.S. medical education (PR = 1.39, 95% CI: 1.02, 1.90) were associated with successful completion of projects. Mentor publication record (PR = 3.13) did not retain significance due to small sample size. Most respondents (65%) cited "lack of time" as a major project barrier. Programs seeking to increase resident publications should consider an institutional epidemiology/biostatistical core available to all residency research projects, and residents should choose experienced mentors with a track record of publications.

  14. Developing a Mathematical Model for Scheduling and Determining Success Probability of Research Projects Considering Complex-Fuzzy Networks

    Directory of Open Access Journals (Sweden)

    Gholamreza Norouzi

    2015-01-01

    Full Text Available In project management context, time management is one of the most important factors affecting project success. This paper proposes a new method to solve research project scheduling problems (RPSP containing Fuzzy Graphical Evaluation and Review Technique (FGERT networks. Through the deliverables of this method, a proper estimation of project completion time (PCT and success probability can be achieved. So algorithms were developed to cover all features of the problem based on three main parameters “duration, occurrence probability, and success probability.” These developed algorithms were known as PR-FGERT (Parallel and Reversible-Fuzzy GERT networks. The main provided framework includes simplifying the network of project and taking regular steps to determine PCT and success probability. Simplifications include (1 equivalent making of parallel and series branches in fuzzy network considering the concepts of probabilistic nodes, (2 equivalent making of delay or reversible-to-itself branches and impact of changing the parameters of time and probability based on removing related branches, (3 equivalent making of simple and complex loops, and (4 an algorithm that was provided to resolve no-loop fuzzy network, after equivalent making. Finally, the performance of models was compared with existing methods. The results showed proper and real performance of models in comparison with existing methods.

  15. A Synthesis and Survey of Critical Success Factors for Computer Technology Projects

    Science.gov (United States)

    Baker, Ross A.

    2012-01-01

    The author investigated the existence of critical success factors for computer technology projects. Current research literature and a survey of experienced project managers indicate that there are 23 critical success factors (CSFs) that correlate with project success. The survey gathered an assessment of project success and the degree to which…

  16. Final ITER CTA project board meeting

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2003-01-01

    The final ITER CTA Project Board Meeting (PB) took place in Barcelona, Spain on 8 December 2002. The PB took notes of the comments concerning the status of the International Team and the Participants Teams, including Dr. Aymar's report 'From ITER to a FUSION Power Reactor' and the assessment of the ITER project cost estimate

  17. European projects: a new wave of success

    CERN Document Server

    2011-01-01

    Since the beginning of this year, no fewer than six new EU projects at CERN have been launched. These are just a third of the projects selected by the European Commission for funding during the course of 2010, bringing in some 23 M€ over a period of two to five years. This makes last year our most successful yet in securing EU support, and places CERN among the top 50 out of more than 10,000 participants in the EU’s seventh Framework Programme.   The success rate of our proposals has been very good ever since the beginning of FP7 in 2007, particularly for projects coordinated by CERN. There has been a clear evolution of CERN’s involvement in EU projects over the last 10 years. In the early days, we tended to target the Marie Curie actions and the e-Infrastructures Programme. The former help us to fulfil our mission to train young people, while the latter supported the development of the European Grid, mainly through the EGEE projects. Later, the Organization became a...

  18. Reactor vessel decommissioning project. Final report

    International Nuclear Information System (INIS)

    Schoonen, D.H.

    1984-09-01

    This report describes a reactor vessel decommissioning project; it documents and explains the project objectives, scope, performance results, and sodium removal process. The project was successfully completed in FY-1983, within budget and without significant problems or adverse impact on the environment. Waste generated by the operation included the reactor vessel, drained sodium, and liquid, solid, and gaseous wastes which were significantly less than project estimates. Personnel radiation exposures were minimized, such that the project total was one-half the predicted exposure level. Except for the sodium removed, the material remaining in the reactor vessel is essentially the same as when the vessel arrived for processing

  19. Successful healthcare programs and projects: organization portfolio management essentials.

    Science.gov (United States)

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.

  20. A Correlational Study Assessing the Relationships among Information Technology Project Complexity, Project Complication, and Project Success

    Science.gov (United States)

    Williamson, David J.

    2011-01-01

    The specific problem addressed in this study was the low success rate of information technology (IT) projects in the U.S. Due to the abstract nature and inherent complexity of software development, IT projects are among the most complex projects encountered. Most existing schools of project management theory are based on the rational systems…

  1. Critical Success Factors for Malaysian Construction Projects: An Investigative Review

    Directory of Open Access Journals (Sweden)

    Yee Cheong Yong

    2017-05-01

    Full Text Available Construction projects play an important role in the advancement of a nation through infrastructure development that leads to economic growth. They are planned carefully to accomplish certain goals. However, not all the projects achieved the goals as per planned. Many factors contribute to the successes and failures, and it becomes an interesting arena for research. The primary objective of this paper is to outline the development trend of project success measurement globally and locally. The research method employed was to make selected reviews on critical success factors' (CSFs literature and to compare international standards and progress in incorporating human behavioural aspects of project management to the situation in Malaysia. A somewhat similar pattern can be observed in Malaysia where the studies have departed from the usual criteria of time, cost and quality, to define project success in a more holistic way. However, the domestic industry has failed to respond to the emerging trend globally as there has yet been any widely published research on the importance of human-related factors towards project success. A consolidated framework of CSFs has therefore, been proposed in responding to the findings. This paper fulfils an identified need as there has been a dearth of research on the subject matter locally.

  2. Automated metadata--final project report

    International Nuclear Information System (INIS)

    Schissel, David

    2016-01-01

    This report summarizes the work of the Automated Metadata, Provenance Cataloging, and Navigable Interfaces: Ensuring the Usefulness of Extreme-Scale Data Project (MPO Project) funded by the United States Department of Energy (DOE), Offices of Advanced Scientific Computing Research and Fusion Energy Sciences. Initially funded for three years starting in 2012, it was extended for 6 months with additional funding. The project was a collaboration between scientists at General Atomics, Lawrence Berkley National Laboratory (LBNL), and Massachusetts Institute of Technology (MIT). The group leveraged existing computer science technology where possible, and extended or created new capabilities where required. The MPO project was able to successfully create a suite of software tools that can be used by a scientific community to automatically document their scientific workflows. These tools were integrated into workflows for fusion energy and climate research illustrating the general applicability of the project's toolkit. Feedback was very positive on the project's toolkit and the value of such automatic workflow documentation to the scientific endeavor.

  3. CRITICAL SUCCESS FACTORS FOR BROWN-FIELD CAPITAL AND RENEWAL PROJECTS

    Directory of Open Access Journals (Sweden)

    J. Warchol

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: Manufacturing companies operate in a business environment where incremental growth may be achieved through expansion and renewal of existing plant and facilities. Effective management of the critical success factors of such capital development projects may also provide competitive advantage. These projects tend to be of a brown-field nature, characterised by a significant level of risk arising from the interaction between the project implementation and concurrent operation of the existing physical asset base. So it is vital to understand the factors that influence the success of capital expansion and renewal projects in the brown-field context. Although each project has unique features, there are critical success factors that can be customised for successful outcomes in the brown-field environment. This study identifies five critical success factors applicable to brown-field capital expansion and renewal projects. Managerial focus on the critical factors, and the prospects for successful brown-field projects, are discussed in the paper.

    AFRIKAANSE OPSOMMING: Vervaardigers funksioneer in ‘n sakeomgewing waar voortgesette groei bereik word via uitbreiding en hernuwing van bestaande fasiliteite. Die doeltreffende bestuur van kritiese suksesfaktore van sodanige kapitaalprojekte bied geleentheid vir mededingende voordeel. Projekte van hierdie aard neig om geklassifiseer te word as van herontwikkelingsaard, met betekenisvolle gepaardgaande risiko wat voortspruit uit die interaksie tussen projekimplementering en gelyktydige bedryf van bestaande fisiese bates. Derhalwe is dit belangrik om in die konteks van herontwikkeling aandag te gee aan die kritiese faktore wat ‘n rol speel in die bereiking van sukses. Die navorsing identifiseer vyf kritiese suksesfaktore van belang vir uitbreidings- en vernuwingsprojekte.

  4. FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Burger, Chris [Patrick Engineering Inc., Lisle, IL (United States); Wortman, David [Patrick Engineering Inc., Lisle, IL (United States); Brown, Chris [Battelle Memorial Inst., Richland, WA (United States); Hassan, Syed [Gulf Interstate Engineering, Houston, TX (United States); Humphreys, Ken [Futuregen Industrial Alliance, Inc., Washington, D.C. (United States); Willford, Mark [Futuregen Industrial Alliance, Inc., Washington, D.C. (United States)

    2016-03-31

    The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipeline and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration

  5. The success of international development projects, trust and communication: an African perspective

    Energy Technology Data Exchange (ETDEWEB)

    Diallo, A.; Thuillier, D. [Universite du Quebec a Montreal (Canada). Dept. Management et Technologie

    2005-04-01

    Project success is strongly linked to communication and cooperation between stakeholders. This research explores the relationship between trust and communication and tests the influence of these factors upon project success and success criteria for international development projects financed by multilateral institutions in sub-Saharan Africa. The research analyses the coordinators' perceptions of project success, communication climate and interpersonal relationship between himself and his stakeholders (task manager in the multilateral agency, national supervisor) and within the project team. Data were collected from questionnaires completed by project coordinators of development projects. The statistical analysis confirms that trust and communication between players are proxy variables. Trust between the task manager and the coordinator is the key success factor, whereas team cohesion is the second most important factor. Trust between the coordinator and his national supervisor does not play a prominent role, although the task manager considers significant local autonomy for the coordinator a prerequisite for funding a subsequent phase when the project comes to an end. (author)

  6. Impact of Leadership Styles on Project Success – The Case of a Multinational Company

    Directory of Open Access Journals (Sweden)

    Bálint Blaskovics

    2014-11-01

    Full Text Available Literature on project success mainly focused on identifying and analyzing success criteria and critical success factors. Success criteria are used for evaluating the success of a project and critical success factors are those factors which increase the potential for achieving project success. However, the interrelationships among them were rarely analyzed, although researchers highlighted the importance of these interrelationships. The aim of the paper is to identify a leadership style, of which project managers can maximize the potential for achieving project success. Project success is analyzed from the point of view of success criteria. This approach manages the shortcoming mentioned above, the lack of analyzing interrelationships among critical success factors and success criteria. This outcome is drawn from qualitative field research at a subsidiary of a Scandinavian-based multinational company.

  7. Technical approach to finalizing sensible soil cleanup levels at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Carr, D.; Hertel, B.; Jewett, M.; Janke, R.; Conner, B.

    1996-01-01

    The remedial strategy for addressing contaminated environmental media was recently finalized for the US Department of Energy's (DOE) Fernald Environmental Management Project (FEMP) following almost 10 years of detailed technical analysis. The FEMP represents one of the first major nuclear facilities to successfully complete the Remedial Investigation/Feasibility Study (RI/FS) phase of the environmental restoration process. A critical element of this success was the establishment of sensible cleanup levels for contaminated soil and groundwater both on and off the FEMP property. These cleanup levels were derived based upon a strict application of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) regulations and guidance, coupled with positive input from the regulatory agencies and the local community regarding projected future land uses for the site. The approach for establishing the cleanup levels was based upon a Feasibility Study (FS) strategy that examined a bounding range of viable future land uses for the site. Within each land use, the cost and technical implications of a range of health-protective cleanup levels for the environmental media were analyzed. Technical considerations in driving these cleanup levels included: direct exposure routes to viable human receptors; cross- media impacts to air, surface water, and groundwater; technical practicality of attaining the levels; volume of affected media; impact to sensitive environmental receptors or ecosystems; and cost. This paper will discuss the technical approach used to support the finalization of the cleanup levels for the site. The final cleanup levels provide the last remaining significant piece to the puzzle of establishing a final site-wide remedial strategy for the FEMP, and positions the facility for the expedient completion of site-wide remedial activities

  8. Sustainability: An Ethical Approach Towards Project Business Success

    OpenAIRE

    G. S. Dangayach

    2011-01-01

    For any country the project management has been a vital part for its development. The highly competitive business world has created tremendous pressure on the project managers to achieve success. The pressure is derived from survival and profit building in business organizations which compels the project managers to pursue unethical practices. As a result unethical activities in business projects can be found easily where situations or issues arise due to dubious business...

  9. Andragogical Modeling and the Success of the "EMPACTS" project-based learning model in the STEM disciplines: A decade of growth and learner success in the 2Y College Learning Environment.

    Science.gov (United States)

    Phillips, C. D.; Thomason, R.; Galloway, M.; Sorey, N.; Stidham, L.; Torgerson, M.

    2014-12-01

    EMPACTS (Educationally Managed Projects Advancing Curriculum, Technology/Teamwork and Service) is a project-based, adult learning modelthat is designed to enhance learning of course content through real-world application and problem solving self directed and collaborative learning use of technology service to the community EMPACTS students are self-directed in their learning, often working in teams to develop, implement, report and present final project results. EMPACTS faculty use community based projects to increase deeper learning of course content through "real-world" service experiences. Learners develop personal and interpersonal work and communication skills as they plan, execute and complete project goals together. Technology is used as a tool to solve problems and to publish the products of their learning experiences. Courses across a broad STEM curriculum integrate the EMPACTS project experience into the overall learning outcomes as part of the learning college mission of preparing 2Y graduates for future academic and/or workforce success. Since the program began in 2005, there have been over 200 completed projects/year. Student driven successes have led to the establishment of an EMPACTS Technology Corp, which is funded through scholarship and allows EMPACTS learners the opportunity to serve and learn from one another as "peer instructors." Engineering and 3D graphic design teams have written technology proposals and received funding for 3D printing replication projects, which have benefited the college as a whole through grant opportunities tied to these small scale successes. EMPACTS students engage in a variety of outreachprojects with area schools as they share the successes and joys of self directed, inquiry, project based learning. The EMPACTS Program has successfully trained faculty and students in the implementation of the model and conduct semester to semester and once a year workshops for college and K-12 faculty, who are interested in

  10. Automated metadata--final project report

    Energy Technology Data Exchange (ETDEWEB)

    Schissel, David [General Atomics, San Diego, CA (United States)

    2016-04-01

    This report summarizes the work of the Automated Metadata, Provenance Cataloging, and Navigable Interfaces: Ensuring the Usefulness of Extreme-Scale Data Project (MPO Project) funded by the United States Department of Energy (DOE), Offices of Advanced Scientific Computing Research and Fusion Energy Sciences. Initially funded for three years starting in 2012, it was extended for 6 months with additional funding. The project was a collaboration between scientists at General Atomics, Lawrence Berkley National Laboratory (LBNL), and Massachusetts Institute of Technology (MIT). The group leveraged existing computer science technology where possible, and extended or created new capabilities where required. The MPO project was able to successfully create a suite of software tools that can be used by a scientific community to automatically document their scientific workflows. These tools were integrated into workflows for fusion energy and climate research illustrating the general applicability of the project’s toolkit. Feedback was very positive on the project’s toolkit and the value of such automatic workflow documentation to the scientific endeavor.

  11. Avoiding failure: tools for successful and sustainable quality-improvement projects

    International Nuclear Information System (INIS)

    Donnelly, Lane F.

    2017-01-01

    Involvement in successful and sustained quality improvement can be a very rewarding experience. However, it can be very difficult work. Up to 70% of attempted organizational change is not sustained. There are many reasons why quality-improvement projects might not be successful. In this article, the author reviews items associated with an increased or decreased likelihood of success. Such items have been categorized as structural issues, human issues and environmental context. This paper is intended to serve those embarking on quality-improvement projects as a resource to help position them for success. (orig.)

  12. Avoiding failure: tools for successful and sustainable quality-improvement projects

    Energy Technology Data Exchange (ETDEWEB)

    Donnelly, Lane F. [Texas Children' s Hospital, Department of Radiology, Houston, TX (United States)

    2017-06-15

    Involvement in successful and sustained quality improvement can be a very rewarding experience. However, it can be very difficult work. Up to 70% of attempted organizational change is not sustained. There are many reasons why quality-improvement projects might not be successful. In this article, the author reviews items associated with an increased or decreased likelihood of success. Such items have been categorized as structural issues, human issues and environmental context. This paper is intended to serve those embarking on quality-improvement projects as a resource to help position them for success. (orig.)

  13. Avoiding failure: tools for successful and sustainable quality-improvement projects.

    Science.gov (United States)

    Donnelly, Lane F

    2017-06-01

    Involvement in successful and sustained quality improvement can be a very rewarding experience. However, it can be very difficult work. Up to 70% of attempted organizational change is not sustained. There are many reasons why quality-improvement projects might not be successful. In this article, the author reviews items associated with an increased or decreased likelihood of success. Such items have been categorized as structural issues, human issues and environmental context. This paper is intended to serve those embarking on quality-improvement projects as a resource to help position them for success.

  14. Conditions, factors and criteria for successful project implementation: generalization of experience of project management

    Directory of Open Access Journals (Sweden)

    Feraru Galina Sergeevna

    2014-11-01

    Full Text Available The article addresses issues characterizing features of project management contributing to their competitive advantage; shows the factors and criteria of success of projects and the main reasons for their failures, making the failed efforts of developers to create projects.

  15. A Project Manager's Personal Attributes as Predictors for Success

    National Research Council Canada - National Science Library

    Valencia, Vhance V

    2007-01-01

    ...) possess that lead them to project management success. Numerous attributes are identified in the literature through a variety of methods, but very few studies relate specific qualities to success...

  16. ROLL OUT THE TALENT : Final project report

    OpenAIRE

    Eerola, Tuomas; Tuominen, Pirjo; Hakkarainen, Riitta-Liisa; Laurikainen, Marja; Mero, Niina

    2014-01-01

    The ROLL OUT THE TALENT project was born out of the desire to recognise and support the strengths of vocational students and to develop new and innovative operating models. ROLL OUT THE TALENT promoted regional cooperation between institutes and companies. The project produced operating and study path models that take into consideration the individual strengths of vocational students and the principles of lifelong learning. This is the final report of the ROLL OUT THE TALENT project, and ...

  17. Leadership in Project Management: A Study of the Relationship between Leadership Styles and Industry Type on Project Success

    Science.gov (United States)

    Barrantes-Guevara, Rita I.

    2013-01-01

    Every year organizations invest billions of dollars in Information Technology (IT) projects; however, IT project success rates continue to be low. Several critical success factors are mentioned in the research literature, the leadership skills of the project manager being one of the most frequently cited in the recent project management…

  18. The fracture zone project - final report

    International Nuclear Information System (INIS)

    Andersson, Peter

    1993-09-01

    This report summarizes the work and the experiences gained during the fracture zone project at the Finnsjoen study site. The project is probably the biggest effort, so far, to characterize a major fracture zone in crystalline bedrock. The project was running between 1984-1990 involving a large number of geological, geohydrological, geochemical, and geomechanical investigation. The methods used for identification and characterization are reviewed and discussed in terms of applicability and possible improvements for future investigations. The discussion is exemplified with results from the investigation within the project. Flow and transport properties of the zone determined from hydraulic tests and tracer tests are discussed. A large number of numerical modelling efforts performed within the fracture zone project, the INTRAVAL project, and the SKB91-study are summarized and reviewed. Finally, occurrence of similar zones and the relevance of major low angle fracture zones in connection to the siting of an underground repository is addressed

  19. [Case control trial on putative factors antagonising the successful project course of MD thesis projects].

    Science.gov (United States)

    Scharfenberg, J; Schaper, K; Krummenauer, F

    2015-05-01

    Award of the degree MD has special relevance in Germany since the underlying research project can be started during the qualification for admission to doctoral training. This leads to a large number of thesis projects with a not always sufficiently pronounced enthusiasm and thus poor chances of success. Accordingly a case control study was undertaken in the Department of Human Medicine, Witten/Herdecke University to investigate reported drop-outs of thesis projects. In autumn 2012 all students in the clinical phases of human medicine education were surveyed using a self-conceived questionnaire on previously initiated or terminated thesis projects, "terminated" is defined as the unsuccessful ending of a project after working for at least 3 months. Individually reported thesis terminations were evaluated using defined items in a 4-stage Likert scale regarding thesis plan and project, subsequently, graduate students who successfully completed a project received the same questionnaire. The items possibly corresponding to process determinants were averaged to a total of 7 dimensions prior to the analysis; the resulting scores were normalised in value ranges 0.0 to 1.0 (1.0 = optimal project situation) whereby individual items could be included in several scores. By means of 5 items a primary endpoint from the faculty's perspective on "compliance with formal procedures" was aggregated; by means of a two-sided Wilcoxon test at the 5 % level students with unsuccessful and successful courses were compared along the corresponding scores. 181 of 276 students from 7 study semesters participated in the screening; details of 17 terminations and 23 currently successful courses could be evaluated in the case control study. For significant differences (p thesis projects to the responsible committees. A weakness is the low number of evaluable self-reported drop-outs as well as the overall moderate response rate. Georg Thieme Verlag KG Stuttgart · New York.

  20. 78 FR 26063 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Final Environmental...

    Science.gov (United States)

    2013-05-03

    ...-100-00-0-0, CUPCA00] Central Utah Project Completion Act; East Hobble Creek Restoration Project Final... Creek Restoration Project. These two agencies have determined that the proposed [[Page 26064

  1. The final disposal of radioactive wastes as social, political and scientific project - an introduction

    International Nuclear Information System (INIS)

    Brunnengraeber, Achim

    2015-01-01

    The nuclear power production that was productive for two generations produces radioactive wastes that will be a hazardous and financial burden for many future generations. Science, politics, industry and the society are responsible to find a successful solution for the project of final disposal of radioactive wastes. With the fast development of renewable energies with the perspectives of sustainability and other advantages nuclear power will not have a remarkable future. The search for a final repository site is a tremendous governmental, economic and public challenge but can also be seen as a social chance. Democracy could be enforced by this process, public commitment, transparency, co-determination, confidence in political processes are indispensible premises.

  2. How Healthy Is My Project? Open Source Project Attributes as Indicators of Success

    NARCIS (Netherlands)

    Piggot, James; Amrit, Chintan Amrit; Petrinja, Etiel; Succi, Giancarlo; El Ioini, Nabil; Sillitti, Alberto

    2013-01-01

    Determining what factors can influence the successful outcome of a software project has been labeled by many scholars and software engineers as a difficult problem. In this paper we use machine learning to create a model that can determine the stage a software project has obtained with some

  3. Advanced Air Transportation Technologies Project, Final Document Collection

    Science.gov (United States)

    Mogford, Richard H.; Wold, Sheryl (Editor)

    2008-01-01

    This CD ROM contains a compilation of the final documents of the Advanced Air Transportation Technologies (AAIT) project, which was an eight-year (1996 to 2004), $400M project managed by the Airspace Systems Program office, which was part of the Aeronautics Research Mission Directorate at NASA Headquarters. AAIT focused on developing advanced automation tools and air traffic management concepts that would help improve the efficiency of the National Airspace System, while maintaining or enhancing safety. The documents contained in the CD are final reports on AAIT tasks that serve to document the project's accomplishments over its eight-year term. Documents include information on: Advanced Air Transportation Technologies, Autonomous Operations Planner, Collaborative Arrival Planner, Distributed Air/Ground Traffic Management Concept Elements 5, 6, & 11, Direct-To, Direct-To Technology Transfer, Expedite Departure Path, En Route Data Exchange, Final Approach Spacing Tool - (Active and Passive), Multi-Center Traffic Management Advisor, Multi Center Traffic Management Advisor Technology Transfer, Surface Movement Advisor, Surface Management System, Surface Management System Technology Transfer and Traffic Flow Management Research & Development.

  4. Correlational Study of Risk Management and Information Technology Project Success

    Science.gov (United States)

    Gillespie, Seth J.

    2014-01-01

    Many IT projects fail despite the best efforts to keep these projects within budget, schedule, and scope. Few studies have looked at the effect of project risk management tools and techniques on project success. The primary focus of this study was to examine the extent to which utilization of project risk management processes influence project…

  5. The Role and the Effects of Risk Management in IT Projects Success

    Directory of Open Access Journals (Sweden)

    Otniel DIDRAGA

    2013-01-01

    Full Text Available The success of IT projects is influenced by risk and risk management according to the existing project management literature. The paper emphasizes the role of risk management and its contribution to projects success in the existing literature. The methodology applied is based on documentary study review and analysis of the concepts used by the literature. We analyzed the literature published between 1978 and 2012 from the main IT project management journals and publications. The results are that risk management is a very important component of the project management process and it is assumed implicitly to work in favour of project success. We also performed a quantitative analysis of how risk management processes affect the subjective and objective performance of IT projects in Romanian IT companies.

  6. The project on site - setting the scene for successful industrial relations

    International Nuclear Information System (INIS)

    Morris, D.; Kershaw, A.R.

    1989-01-01

    The site construction performance at Torness and Heysham 2 has been described in various other papers during the Conference and in common with other large projects undertaken over the last 20 years a final judgement will be made as to whether, in simple terms, they were ''good'' or ''bad'' sites. Although there are many individuals or organisations who may make this judgement, it is unlikely that the basic conclusion will differ. What may differ however is the list of reasons that will be advanced to explain the final result. Looking at the investigations made into past projects, the reasons advanced for their success or otherwise can range from the geographical location of the site to material delivery problems, design changes, safety issues, or even the state of the overall national economic climate during the period under scrutiny. Where industrial relations problems are singled out, they can usually be linked to one or more of the factors mentioned. When looking at the complexity of projects such as Torness and Heysham, it is to be expected that unlooked for difficulties and problems will always arise but it is equally true that there is sufficient experience and expertise available in the industry for many possible problem areas to be anticipated and ''designed'' out before work even commences on site. This paper will be looking at the clients' role in creating a suitable environment for contractors to fully manage all aspects of their site operation and to ensure that acute problems can receive the full attention of all parties and not have to be set against a continuing background of unnecessary irritations. (author)

  7. 76 FR 57729 - Boundary Hydroelectric Project; Sullivan Creek Project; Notice of Availability of the Final...

    Science.gov (United States)

    2011-09-16

    ...-015] Boundary Hydroelectric Project; Sullivan Creek Project; Notice of Availability of the Final Environmental Impact Statement for the Relicensing of the Boundary Hydroelectric Project and the Surrender of... reviewed the applications for license for the Boundary Hydroelectric Project (FERC No. 2144-38), and the...

  8. Prototypical Consolidation Demonstration Project: Final report

    International Nuclear Information System (INIS)

    Gili, J.A.; Poston, V.K.

    1993-11-01

    This is the final report of the Prototypical Consolidation Demonstration Project, which was funded by the US Department of Energy's Office of Civilian Radioactive Waste Management. The project had two objectives: (a) to develop and demonstrate a prototype of production-scale equipment for the dry, horizontal consolidation and packaging of spent nuclear fuel rods from commercial boiling water reactor and pressurized water reactor fuel assemblies, and (b) to report the development and demonstration results to the US Department of Energy, Idaho Operations Office. This report summarizes the activities and conclusions of the project management contractor, EG ampersand G Idaho, Inc., and the fabrication and testing contractor, NUS Corporation (NUS). The report also presents EG ampersand G Idaho's assessments of the equipment and procedures developed by NUS

  9. Increasing Prediction the Original Final Year Project of Student Using Genetic Algorithm

    Science.gov (United States)

    Saragih, Rijois Iboy Erwin; Turnip, Mardi; Sitanggang, Delima; Aritonang, Mendarissan; Harianja, Eva

    2018-04-01

    Final year project is very important forgraduation study of a student. Unfortunately, many students are not seriouslydidtheir final projects. Many of studentsask for someone to do it for them. In this paper, an application of genetic algorithms to predict the original final year project of a studentis proposed. In the simulation, the data of the final project for the last 5 years is collected. The genetic algorithm has several operators namely population, selection, crossover, and mutation. The result suggest that genetic algorithm can do better prediction than other comparable model. Experimental results of predicting showed that 70% was more accurate than the previous researched.

  10. Software development project success and failure from the supplier's perspective: A systematic literature review

    OpenAIRE

    Savolainen, Paula; Ahonen, Jarmo J.; Richardson, Ita

    2012-01-01

    peer-reviewed In this paper, we consider software development project success and failure from the supplier's perspective. First we clarified concepts in order to be able to exclude review articles on in-house projects, continuous services, the customer's perspective, and software product development, with the aim of providing valid results for supplier firms. We divided success criteria into project success and project management (PM) success, and, in seven articles, identified thre...

  11. A Quantitative Examination of Critical Success Factors Comparing Agile and Waterfall Project Management Methodologies

    Science.gov (United States)

    Pedersen, Mitra

    2013-01-01

    This study investigated the rate of success for IT projects using agile and standard project management methodologies. Any successful project requires use of project methodology. Specifically, large projects require formal project management methodologies or models, which establish a blueprint of processes and project planning activities. This…

  12. Final Report of the Final Meeting of Project Coordinators

    International Nuclear Information System (INIS)

    Cordero Calderon, Carlos F.

    1996-06-01

    The Costa Rican Electricity Institute has always been worried of the verification of the good state of the works and thus to guarantee their operation. For that reason, it has established different sorts of auscultation of the Arenal's Dam. Some investigations have been done to find new methods to improve and to eliminate risks in different works or projects. The Arenal's Dam is one of the greatest engineering works in Costa Rica, it has the Arenal, Corobici and Sandillal Hydroelectric Plants. Furthermore, the irrigation system in the Tempisque River Valley, in the Guanacaste province. One special characteristic of the Site of the Dam, is the near location of the Arenal Volcano, in full activity and located at 6 Km. from the dam. This report has two goals, one is the traditional permanent measurements report for the project, and the other, is to present it as a final work of the Project Arcal XVIII, to the International Atomic Energy Agency. This report analyses the geo-hydraulic, structural and topographic auscultation, as well as the activities accomplished during the ARCAL XVIII /8/018, Application of Tracer Techniques for Leakage in Dams and Damming Project, based on information gathered through the geo-chemical auscultation, until June 1996. (author).30 ills., 80 charts, 35 tabs

  13. Factors that Impact Software Project Success in Offshore Information Technology (IT) Companies

    Science.gov (United States)

    Edara, Venkatarao

    2011-01-01

    Information technology (IT) projects are unsuccessful at a rate of 65% to 75% per year, in spite of employing the latest technologies and training employees. Although many studies have been conducted on project successes in U.S. companies, there is a lack of research studying the impact of various factors on software project success in offshore IT…

  14. Project Rio Blanco: site restoration. Final report

    International Nuclear Information System (INIS)

    1978-01-01

    Project Rio Blanco was a joint Government-industry experiment using nuclear explosives to stimulate the flow of natural gas from low permeability formations which could not be economically produced through conventional methods. The project consisted of the simultaneous detonation of three nuclear explosives on May 17, 1973, in a 7,000 foot well in northwestern Colorado. Gas production testing and project evaluation continued through June 1976. The site cleanup and restoration planning phase began in December 1975 and was concluded with the issuance of an operational plan, Project Rio Blanco Site Cleanup and Restoration Plan, NVO-173, in May 1976. Actual site restoration activities were conducted during the period from July to November 1976. The activities throughout the restoration period are summarized and the final site status, including the disposition of all project facilities and the status of all project related wells after plug and abandonment and recompletion work are described

  15. LYNX community advocacy & service engagement (CASE) project final report.

    Science.gov (United States)

    2009-05-14

    This report is a final assessment of the Community Advocacy & Service Engagement (CASE) project, a LYNX-FTA research project designed : to study transit education and public engagement methods in Central Florida. In the Orlando area, as in other part...

  16. Wind energy planning in England, Wales and Denmark: Factors influencing project success

    International Nuclear Information System (INIS)

    McLaren Loring, Joyce

    2007-01-01

    Land-use planning poses a significant barrier to the further development of on-shore wind energy in many countries. There has been increasing discussion regarding the use of public participation in the planning process in order to address concerns of local residents and ease conflicts. This research explores the dynamics of the planning process for wind energy in England, Wales and Denmark in order to better understand the factors influencing project success. Through 18 in-depth case studies, it investigates the degree of local community participation in the planning process and the stability of the network of individuals and organisations involved in the project to determine their relationship to the public's acceptance of the project and the planning outcome. The study draws on the frameworks of public participation in planning and actor-network theories in order to develop indicators of the level of community involvement and network formation for each case. The analysis discusses predictions made by the theoretical approaches as to the importance of these variables to the success of new projects. The results indicate that projects with high levels of participatory planning are more likely to be publicly accepted and successful. In addition, stable supporting networks are more likely to form. The presence of a stable network of supporters is not found to be related to project acceptance and success; however, the absence of a stable network of opponents is found to be necessary for project acceptance and success in receiving planning permission

  17. Mathematical Modeling Projects: Success for All Students

    Science.gov (United States)

    Shelton, Therese

    2018-01-01

    Mathematical modeling allows flexibility for a project-based experience. We share details of our regular capstone course, successful for virtually 100% of our math majors for almost two decades. Our research-like approach in this course accommodates a variety of student backgrounds and interests, and has produced some award-winning student…

  18. SUCCESS CONCEPT ANALYSIS APPLIED TO THE INFORMATION TECHNOLOGY PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Cassio C. Montenegro Duarte

    2012-05-01

    Full Text Available This study evaluates the concept of success in project management that is applicable to the IT universe, from the classical theory associated with the techniques of project management. Therefore, it applies the theoretical analysis associated to the context of information technology in enterprises as well as the classic literature of traditional project management, focusing on its application in business information technology. From the literature developed in the first part of the study, four propositions were prepared for study which formed the basis for the development of the field research with three large companies that develop projects of Information Technology. The methodology used in the study predicted the development of the multiple case study. Empirical evidence suggests that the concept of success found in the classical literature in project management adjusts to the environment management of IT projects. Showed that it is possible to create the model of standard IT projects in order to replicate it in future derivatives projects, which depends on the learning acquired at the end of a long and continuous process and sponsorship of senior management, which ultimately results in its merger into the company culture.

  19. How is success or failure in river restoration projects evaluated? Feedback from French restoration projects.

    Science.gov (United States)

    Morandi, Bertrand; Piégay, Hervé; Lamouroux, Nicolas; Vaudor, Lise

    2014-05-01

    Since the 1990s, French operational managers and scientists have been involved in the environmental restoration of rivers. The European Water Framework Directive (2000) highlights the need for feedback from restoration projects and for evidence-based evaluation of success. Based on 44 French pilot projects that included such an evaluation, the present study includes: 1) an introduction to restoration projects based on their general characteristics 2) a description of evaluation strategies and authorities in charge of their implementation, and 3) a focus on the evaluation of results and the links between these results and evaluation strategies. The results show that: 1) the quality of an evaluation strategy often remains too poor to understand well the link between a restoration project and ecological changes; 2) in many cases, the conclusions drawn are contradictory, making it difficult to determine the success or failure of a restoration project; and 3) the projects with the poorest evaluation strategies generally have the most positive conclusions about the effects of restoration. Recommendations are that evaluation strategies should be designed early in the project planning process and be based on clearly-defined objectives. Copyright © 2014 Elsevier Ltd. All rights reserved.

  20. Admiralty Inlet Pilot Tidal Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Collar, Craig [Public Utility District No. 1 of Snohomish County, Everett, WA (United States)

    2015-09-14

    This document represents the final report for the Admiralty Inlet Pilot Tidal Project, located in Puget Sound, Washington, United States. The Project purpose was to license, permit, and install a grid-connected deep-water tidal turbine array (two turbines) to be used as a platform to gather operational and environmental data on tidal energy generation. The data could then be used to better inform the viability of commercial tidal energy generation from technical, economic, social, and environmental standpoints. This data would serve as a critical step towards the responsible advancement of commercial scale tidal energy in the United States and around the world. In late 2014, Project activities were discontinued due to escalating costs, and the DOE award was terminated in early 2015. Permitting, licensing, and engineering design activities were completed under this award. Final design, deployment, operation, and monitoring were not completed. This report discusses the results and accomplishments achieved under the subject award.

  1. The New Mexico Technology Deployment Pilot Project: A technology reinvestment project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The New Mexico Technology Deployment Project (NMTDP) has been in operation for slightly more than two years. As one of the original TRP projects, NMTDP had the charter to develop and validate a new model for technology extraction which emphasized focused technology collaboration, early industry involvement, and a strong dual use commercialization and productization emphasis. Taken in total, the first two years of the NMTDP have been exceptionally successful, surpassing the goals of the project. This report describes the accomplishments and evolution of the NMTDP to date and discusses the future potential of the project. Despite the end of federal funding, and a subsequent reduction in level of effort, the project partners are committed to continuation of the project.

  2. DETERMINANTS AFFECTING THE SUCCESS OF DISTRIBUTION GRID PROJECTS IN BINH THUAN POWER COMPANY, VIETNAM

    OpenAIRE

    Pham Van Tai* & Le Duc Thu

    2017-01-01

    The research identified the critical factors affecting the success of the distribution grid project in Binh Thuan Power Company, clarify the mutual relationship between the critical factors affecting the success of the distribution grid project in Binh Thuan Power Company and recommended and rated the solution to enhance the success of the distribution grid project in Binh Thuan Power Company. The research had found fours critical factors: External factors of project, Controlling and coordina...

  3. Risk Management Affecting IS/IT Project Success Through Communicative Action

    NARCIS (Netherlands)

    de Bakker, K.F.C.; Boonstra, A.; Wortmann, J.C.

    Project risk management is defined in the literature as being instrumental action based on rational problem solving. Research indicates limited positive effects of an exclusive focus of instrumental action on project success. This article proposes to extend this instrumental view through

  4. Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Collar, Craig W

    2012-11-16

    Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step toward potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and

  5. Increasing the Value of Research: A Comparison of the Literature on Critical Success Factors for Projects, IT Projects and Enterprise Resource Planning Projects

    Directory of Open Access Journals (Sweden)

    Annie Maddison Warren

    2016-11-01

    Full Text Available Since the beginning of modern project management in the 1960s, academic researchers have sought to identify a definitive list of Critical Success Factors (CSFs, the key things that project managers must get right in order to deliver a successful product. With the advent of Information Technology (IT projects and, more recently, projects to deliver Enterprise Resource Planning (ERP systems, attention has turned to identifying definitive lists of CSFs for these more specific project types. The purpose of this paper is to take stock of this research effort by examining how thinking about each type of project has evolved over time, before producing a consolidated list of CSFs for each as a basis for comparison. This process reveals a high degree of similarity, leading to the conclusion that the goal of identifying a generic list of CSFs for project management has been achieved. Therefore, rather than continuing to describe lists of CSFs, researchers could increase the value of their contribution by taking a step forward and focusing on why, despite this apparent knowledge of how to ensure their success, ERP projects continue to fail.

  6. MIT LMFBR blanket research project. Final summary report

    International Nuclear Information System (INIS)

    Driscoll, M.J.

    1983-08-01

    This is a final summary report on an experimental and analytical program for the investigation of LMFBR blanket characteristics carried out at MIT in the period 1969 to 1983. During this span of time, work was carried out on a wide range of subtasks, ranging from neutronic and photonic measurements in mockups of blankets using the Blanket Test Facility at the MIT Research Reactor, to analytic/numerical investigations of blanket design and economics. The main function of this report is to serve as a resource document which will permit ready reference to the more detailed topical reports and theses issued over the years on the various aspects of project activities. In addition, one aspect of work completed during the final year of the project, on doubly-heterogeneous blanket configurations, is documented for the record

  7. U.S. LCI Database Project--Final Phase I Report

    Energy Technology Data Exchange (ETDEWEB)

    2003-08-01

    This Phase I final report reviews the process and provides a plan for the execution of subsequent phases of the database project, including recommended data development priorities and a preliminary cost estimate. The ultimate goal of the project is to develop publicly available LCI Data modules for commonly used materials, products, and processes.

  8. Critical success factors influencing the performance of development projects: An empirical study of Constituency Development Fund projects in Kenya

    OpenAIRE

    Debadyuti Das; Christopher Ngacho

    2017-01-01

    The present work attempts to identify critical success factors (CSFs) influencing the performance of development projects based on their key performance indicators (KPIs). It has considered the case of Constituency Development Fund (CDF) projects constructed between 2003 and 2011 in Kenya and secured the perceptions of 175 respondents comprising clients, consultants and contractors involved in the implementation of CDF projects on 30 success variables. Findings reveal that individual items co...

  9. EuCARD final project report

    CERN Document Server

    Koutchouk, J P

    2014-01-01

    After four years of activity, EuCARD has most of its objectives fulfilled, with some new objectives added and a few others on excellent tracks while requiring additional time. The management has been active in reinforcing the collaborative links between partners and projects, contributing to the preparation of FP7-EuCARD2, initiating FP7-HiLumi-LHC Design Study, to favour sustained collaborations beyond EuCARD. An out-of-contract network has been successfully launched on laser plasma acceleration, to combine forces between accelerator, laser and plasma communities. Communication and dissemination activities have led to two highlights: Accelerating News, an accelerator R&D newsletter initiated by EuCARD and now common to all FP7 accelerator projects (over 1000 subscribers) and a series of monographs on accelerator sciences that is progressively finding its public. The scientific networks have more than fulfilled their initial objectives: roadmaps are defined for neutrino facilities, submitted to the Europe...

  10. Project evaluation: main characteristics

    OpenAIRE

    Moutinho, Nuno

    2010-01-01

    — The evaluation process of real investment projects must consider not only the traditional financial approach, but also non-financial aspects. Non financial analysis can provide additional relevant information about projects. We investigate financial and non-financial areas most relevant in project appraisal. We present main critical success factors and areas of analysis that lead to the perception of project success. Finally, companies are segmented to verify its financial and non-financial...

  11. Rural Math Excel Partnership (RMEP) Project Final Performance Report

    Science.gov (United States)

    Harmon, Hobart; Tate, Veronica; Stevens, Jennifer; Wilborn, Sandy; Adams, Sue

    2018-01-01

    The goal of the Rural Math Excel Partnership (RMEP) project, a development project funded by the U.S. Department of Education Investing in Innovation (i3) grant program, was to develop a model of shared responsibility among families, teachers, and communities in rural areas as collective support for student success in and preparation for advanced…

  12. Diversity in research projects - A key to success?

    Science.gov (United States)

    Henkel, Daniela; Eisenhauer, Anton; Taubner, Isabelle

    2017-04-01

    According to demographers, psychologists, sociologists and economists diverse groups, which are groups of different race, ethnicity, gender and sexual orientation, are more innovative than homogeneous groups. This is also true for groups working together in research collaborations and international cooperation involving a culturally and functionally diverse mix of individuals who have to be integrated into an effective unit - a project team. If the goal is scientific excellence, diversity should be an essential ingredient to conduct science on high level productivity, quality and innovation. Effective teamwork is a key to project success and prime responsibilities of the project manager. Therefore, the project manager has to take into consideration different characteristics such as cultures, languages, and different values related to individual project partners. Here we show how diversity can affect the performance of a research project. Furthermore, the presentation indicates skills and abilities which are required for the management in order to deal also with the challenges of diversity in research projects. The presentation is based on insights experienced in the context of an Innovative Training Network (ITN) project within Marie Skłodowska-Curie Actions of the European HORIZON 2020 program and TRION a Collaborative Research Project in the Framework of the Trilateral Program of the German Research Foundation.

  13. Critical success factors influencing the performance of development projects: An empirical study of Constituency Development Fund projects in Kenya

    Directory of Open Access Journals (Sweden)

    Debadyuti Das

    2017-12-01

    Full Text Available The present work attempts to identify critical success factors (CSFs influencing the performance of development projects based on their key performance indicators (KPIs. It has considered the case of Constituency Development Fund (CDF projects constructed between 2003 and 2011 in Kenya and secured the perceptions of 175 respondents comprising clients, consultants and contractors involved in the implementation of CDF projects on 30 success variables. Findings reveal that individual items constituting these six factors represent six CSFs namely project-related, client-related, consultant-related, contractor-related, supply chain-related, and external environment-related factor. The findings are also relevant to development projects undertaken in other developing countries.

  14. The impact of leadership styles on project success: Case of a telecommunications company

    Directory of Open Access Journals (Sweden)

    Tammy Lategan

    2015-06-01

    Full Text Available Challenges within the customer service industry make leadership styles a key factor in the success of customer service project delivery. This research provides an overview of information and knowledge within a corporate environment with an underlying theme of defining leadership styles within the customer service projects environment to ensure successful project delivery. This research aims to investigate the perception of leadership styles required and factors that contribute to successful project delivery effectiveness within a telecommunication customer service environment. A conceptual research model is formulated and is followed by a quantitative research process and analysis. The results of the study identified that employees had a neutral perception to leadership styles however; different leadership styles are important to themselves and the organisation

  15. Management of Interface between Main Contractor and Subcontractors for Successful Project Outcomes

    Directory of Open Access Journals (Sweden)

    Harry White

    2014-01-01

    Full Text Available There has been increased dependence on subcontracting within the construction industry, the operational relationship between the Main Contractor (MC and Subcontractor (SC plays a significant role in successful delivery of projects. Through the literature review this paper argues that despite SCs bring added value to construction projects, the increased reliance on SCs has strained relationships between the MC and SC. Also MCs are more concerned with risk and price reduction which undermine the relationship heavily. Current practices in the construction industry in managing SCs were evaluated through a case study and semi-structured interviews. A questionnaire survey was used to investigate the ways of facilitating the interface between the MC and SC in general. The study highlighted that prevailing adverse relationships and culture in the industry are influencing the success of construction projects. The lack of trust is a key factor affecting the relationships between MC and SCs. However, the proactive involvement of the MC with SCs in maintaining continuity of the team from procurement to construction stage and transparency in the processes were key success factors for successful completion of the project.

  16. Iowa Hill Pumped Storage Project Investigations - Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Hanson, David [Sacramento Municipal Unitlity District, Sacramento, CA (United States)

    2016-07-01

    This Final Technical Report is a summary of the activities and outcome of the Department of Energy (DOE) Assistance Agreement DE-EE0005414 with the Sacramento Municipal Utility District (SMUD). The Assistance Agreement was created in 2012 to support investigations into the Iowa Hill Pumped-storage Project (Project), a new development that would add an additional 400 MW of capacity to SMUD’s existing 688MW Upper American River Hydroelectric Project (UARP) in the Sierra Nevada mountains east of Sacramento, California.

  17. FINAL REPORT FOR THE DIII-D RADIATIVE DIVERTOR PROJECT

    International Nuclear Information System (INIS)

    O'NEIL, RC; STAMBAUGH, RD

    2002-01-01

    OAK A271 FINAL REPORT FOR THE DIII-D RADIATIVE DIVERTOR PROJECT. The Radiative Divertor Project originated in 1993 when the DIII-D Five Year Plan for the period 1994--1998 was prepared. The Project Information Sheet described the objective of the project as ''to demonstrate dispersal of divertor power by a factor of then with sufficient diagnostics and modeling to extend the results to ITER and TPX''. Key divertor components identified were: (1) Carbon-carbon and graphite armor tiles; (2) The divertor structure providing a gas baffle and cooling; and (3) The divertor cryopumps to pump fuel and impurities

  18. Final report for the 'Melt-Vessel Interactions' Project. European Union R and TD Program 4th Framework. MVI project final research report

    International Nuclear Information System (INIS)

    Sehgal, B.R.; Dinh, T.N.; Nourgaliev, R.R.; Bui, V.A.; Green, J.; Kolb, G.; Karbojian, A.; Theerthan, S.A.; Gubaidulline, A.; Bonnet, J.M.; Rouge, S.; Narcoux, M.; Liegeois, A.; Turland, B.D.; Dobson, G.P.; Siccama, A.; Ikonen, K.; Parozzi, F.; Kolev, N.; Caira, M.

    1999-04-01

    The Melt Vessel Interaction (MVI) project is concerned with the consequences of the interactions that a core melt, generated during a postulated severe accident in a light water reactor, may have with the pressure vessel. In particular, the issues concerned with the failure of the vessel bottom head are the focus of the research. The specific objectives of the project are to obtain data and develop validated models, which could be applied to prototypic plants, and accident conditions, for resolution of issues related to the melt vessel interactions. The project work has been performed by nine partners having varied responsibility. The work included a large number of experiments, with simulant materials, whose observations and results are employed, respectively, to understand the physical mechanisms and to develop validated models. Applications to the prototypic geometry and conditions have also been performed. This report is volume 1 of the Final Report for the Project, in which a summary of the progress achieved in the experimental program is provided. We have, however, included some aspects of the modeling activities. Volume 2 of the Final report describes the progress achieved in the modeling program. The progress achieved in the experimental and modeling parts of the Project has led to the resolution of some of the issues of melt vessel interaction. Considerable progress was also achieved towards resolution of the remaining issues

  19. Northeast Oregon Hatchery Project final siting report. Final report

    International Nuclear Information System (INIS)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed

  20. Success Factors in Wind Power Projects

    International Nuclear Information System (INIS)

    Cabal, H.; Varela, M.; Lago, C.; Saez, R. M.

    2002-01-01

    The Spanish wind energy market has experienced an average annual increase over 60% in recent years. With more than 4.1 GW of power at the end of 2002, this market has became the second in Europe and the third in the world. With the objective of obtaining the origin of this success, an analysis of technical and economic features of selected wind projects has been undertaken to draw the outstanding factors that any new independent promoter/developer should take into account within this market. (Author) 16 refs

  1. Successful Training Development and Implementation in Plant Modernization Projects

    International Nuclear Information System (INIS)

    Kuhn, A.; Schoenfelder, C.

    2012-01-01

    In plant modernization projects, for life extension or power update, the competence development (in particular, job and needs oriented training) of the plant staff plays an important role for ensuring the highest standard of nuclear safety, and for facilitating an economic operation of the plant. This paper describes challenges, methodology, activities, and results obtained so far from an on-going project in Sweden. - - As conclusion, critical factors for a successful staff training in plant modernization projects include a systematic approach to training, a dedicated training management team, and good interfaces between supplier's engineering teams, experienced training providers, and equipment suppliers.

  2. Factors determining the success of public private partnership projects in Nigeria

    Directory of Open Access Journals (Sweden)

    Afeez Olalekan Sanni

    2016-06-01

    Full Text Available The implementation of public private partnership (PPP procurement method is expected to help governments in the development of infrastructures and provides an opportunity for the reduction in the governments’ debt profiles. This method has been adopted in Nigeria for more than a decade and with these years of implementation, few infrastructural projects have been developed using this method while some have been unsuccessful. This study aims to examine the PPP projects implementation in Nigeria and identify the most critical factors that could determine the success of such projects. A total of 184 questionnaires were received from public and private sectors’ participants in the implementation of PPP projects. An exploratory factor analysis identified seven critical success factors as projects feedback, leadership focus, risk allocation and economic policy, good governance and political support, short construction period, favourable socio-economic factors, and delivering publicly needed service. This study shows that more developmental projects could be delivered through PPP if the government could focus on these main factors in the implementation process. The result will influence policy development towards PPP and guide the partners in the development of PPP projects.

  3. Tritium research laboratory cleanup and transition project final report

    International Nuclear Information System (INIS)

    Johnson, A.J.

    1997-02-01

    This Tritium Research Laboratory Cleanup and Transition Project Final Report provides a high-level summary of this project's multidimensional accomplishments. Throughout this report references are provided for in-depth information concerning the various topical areas. Project related records also offer solutions to many of the technical and or administrative challenges that such a cleanup effort requires. These documents and the experience obtained during this effort are valuable resources to the DOE, which has more than 1200 other process contaminated facilities awaiting cleanup and reapplication or demolition

  4. Spent fuel stability under repository conditions - final report of the european project

    International Nuclear Information System (INIS)

    Poinssot, Ch.; Ferry, C.; Kelm, M.; Cavedon, J.M.; Corbel, C.; Jegou, Ch.; Lovera, P.; Miserque, F.; Poulesquen, A.; Grambow, B.; Andriambololona, Z.; Martinez-Esparza, A.; Kelm, M.; Loida, A.; Rondinella, V.; Wegen, D.; Spahiu, K.; Johnson, L.; Cachoir, Ch.; Lemmens, K.; Quinones, J.; Bruno, J.; Christensen, H.; Grambow, B.; Pablo, J. de

    2005-01-01

    This report is the final report of the European Project 'Spent Fuel Stability under Repository Conditions' (FIKW-CT-2001-00192 SFS) funded by the European Commission from Nov.2000 to Oct.2004. Gathering the work performed by 13 partners from 6 countries, it aims to specifically focus on the spent nuclear fuel long term alteration in deep repository and the subsequent radionuclides release rate as a function of time. This report synthesised the wide experimental work performed within this project and enlightens the major outcomes, which can be summarised as follow: - A new model for defining the Instant Release Fraction was developed in order to consider the potential fuel evolution before the water penetrates the canister. Quantitative assessment has been produced and shows a significant contribution to the long term dose; - Based on new experimental data, kinetic radiolytic scheme have been upgraded and are used to determine the amount of oxidants produced at the fuel/water interface; - The existence of a dose threshold below which the water radiolysis does not influence the fuel alteration has been demonstrated and occurs between 3.5 and 33 MBq.g UO21. Above the threshold, the fuel alteration rates is directly related to the dose rate. - Hydrogen was experimentally demonstrated to be an efficient oxidants scavenger preventing therefore the fuel oxidation. Molecular mechanism still need to be understood. - Finally, a new Matrix Alteration Model integrating most of the SFS results (apart of the hydrogen effect) has been developed and used to assess the fuel long tern stability in representative conditions of deep repository in salt, clay-rock and granite. The breadth of the results and the significance of the conclusions testify of the success of the collaboration within the project. (authors)

  5. Factors of human capital related to project success in health care work units.

    Science.gov (United States)

    Suhonen, Marjo; Paasivaara, Leena

    2011-03-01

    To explore factors of human capital related to project success that employees expect from nurse managers. Human capital refers to those resources that managers working with projects possess, such as abilities, knowledge and qualities of character. The data were collected by open interviews (n=14) with nurses, public health nurses and nurse managers working in primary health care and a hospital. Data analysis was carried out using qualitative content analysis. The main factors of human capital related to project success proved to be as follows: (1) management of enthusiastic project culture, (2) management of regeneration and (3) management of emotional intelligence. Future research is needed on the kind of means nurse managers use in human capital management in projects and how they see their possibilities in managing human capital. Human capital management skills should be underlined as an important competence area when recruiting a nurse manager. The success of health care projects cannot be improved only through education or by training of nurse managers; in addition, projects need nurse managers who understand workplace spirituality and have high emotional intelligence. © 2011 The Authors. Journal compilation © 2011 Blackwell Publishing Ltd.

  6. The Role of Requirements in the Success or Failure of Software Projects

    OpenAIRE

    Hussain, Azham; Mkpojiogu, Emmanuel O.C.; Kamal, Fazillah Mohmad

    2016-01-01

    Requirements engineering is pivotal and central to every successful software development project. There are several reasons why software projects fail; however, poorly elicited, documented, validated and managed requirements contribute grossly to software projects failure. Software project failures are normally very costly and risky and these could even a times be life threatening also. Projects that overlook requirements engineering processes often suffer or are most likely to suffer from fa...

  7. Digital project management the complete step-by-step guide to a successful launch

    CERN Document Server

    Olson, Taylor

    2016-01-01

    The digital world is growing and changing at a rate that can seem overwhelming to those project managers who have to keep up with it to build customer-facing solutions and applications. It's rare for project managers working in this field to be provided with much direction or a process by which to carry out a project, and there has been next to nothing available specific to these types of projects in the literary marketplace. Digital Project Management: The Complete Step-by-Step Guide to a Successful Launch was developed to fill this gap by providing the knowledge, best practices and proven steps to consistently managing these types of project successfully from end-to-end now, and in the future with just minor adjustments to adapt to changes in technology.

  8. Common project energy change. The schedule to the success; Gemeinschaftsprojekt Energiewende. Der Fahrplan zum Erfolg

    Energy Technology Data Exchange (ETDEWEB)

    Bartosch, Ulrich [Katholische Univ. Eichstaett-Ingolstadt (Germany).; VDW Vereinigung Deutscher Wissenschaftler, Berlin (Germany); Hennicke, Peter [Wuppertal Institut fuer Klima, Umwelt, Energie GmbH, Wuppertal (Germany); Weiger, Hubert (ed.) [Bund fuer Umwelt und Naturschutz Deutschland e.V. (BUND), Berlin (Germany)

    2014-07-01

    The energy change is the most important common work of the German after-war history. And it offers a unique collective field of learning, how the socio-ecological transformation can be converted in practice. If the energy change succeeds in an industrial country like Germany, many other countries can follow this example. The Bund fuer Umwelt und Naturschutz Deutschland (BUND) and the Vereinigung Deutscher Wissenschaftler (VDW) show as editors, what now must be done in order that the energy change becomes a success. Because currently threatens the energy change to be slowed down by the policy and talked to death by many stakeholders in the industry. This book demonstrates why the energy change is necessary and how it can succeed. It shows what has to be done and wants to use the existing enthusiasm in order to lead the common project energy change jointly to success. What is needed is a long-term policy that finally takes the reduction of energy consumption in attack.

  9. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Appendix A: BP Exploration (Alaska) Inc. Final project description - Revision 1, March 27, 1997

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains Appendix A of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment. This document is the Northstar Development Project, Final Project Description, Revision 1 for BPXA Northstar Project

  10. MORE: Management of Requirements in NPP Modernisation Projects, final report

    International Nuclear Information System (INIS)

    Fredriksen, R.; Katta, V.; Raspotnig, C.; Valkonen, J.

    2008-09-01

    This report documents the work and related activities of the MORE (Management of Requirements in NPP Modernisation Projects) (NKS-R project number NKS-R-2005-47) project. This report also provides a summary of the project activities and deliverables, and discusses possible application areas. The project has aimed at the industrial utilisation of the results from the TACO: (Traceability and Communication of Requirements in Digital I and C Systems Development) (NKS-R project number NKS-R-2002-16, completed June, 2005) project, and practical application of improved approaches and methods for requirements engineering and change management. Finally, the report provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  11. MORE: Management of Requirements in NPP Modernisation Projects, final report

    Energy Technology Data Exchange (ETDEWEB)

    Fredriksen, R.; Katta, V.; Raspotnig, C. (Inst. for energiteknikk (IFE) (Norway)); Valkonen, J. (Technical Research Centre of Finland (VTT) (Finland))

    2008-09-15

    This report documents the work and related activities of the MORE (Management of Requirements in NPP Modernisation Projects) (NKS-R project number NKS-R-2005-47) project. This report also provides a summary of the project activities and deliverables, and discusses possible application areas. The project has aimed at the industrial utilisation of the results from the TACO: (Traceability and Communication of Requirements in Digital I and C Systems Development) (NKS-R project number NKS-R-2002-16, completed June, 2005) project, and practical application of improved approaches and methods for requirements engineering and change management. Finally, the report provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (author)

  12. Successful integration of fast track projects into turnarounds

    Energy Technology Data Exchange (ETDEWEB)

    Williams, J. Patrick; Loureiro, Ramon C. [KBC Advanced Technologies, Surrey (United Kingdom)

    2012-07-01

    Fast track projects can provide quick wins and competitive advantage. However, in most cases the implementation of these projects requires a shutdown for installing the necessary tie-ins or integration into an upcoming turnaround (TA). Depending on the nature of the project and complexity of the TA, the integration can be seamless or result in cost or duration overruns and safety incidents. The risk of such overruns and safety incidents increases with the amount of project work to be integrated into the operations, maintenance and inspection schedules to be executed during the TA. The risk further increases with TA size and other factors. If not planned and scheduled properly and in a timely fashion, capital projects, in particular fast track projects trying to take advantage of an upcoming TA, can severely impact both TA performance, and the safety and reliability of the facility until the next opportunity for eliminating the defects introduced during the TA. Successful TAs are those delivered in a safe, on time, on budget manner, and with the quality standards needed for a leak-free start-up and a safe and reliable operation over the next run cycle. This paper discusses the key elements that are required to minimize the TA risks derived from the inclusion of fast track projects and how to establish the cut off criteria to either cancel or defer the project, or delay the TA in order to balance TA scope freeze and the case for compelling economics.(author)

  13. The Qinshan phase III project-a successful model of sino-canadian cooperation

    International Nuclear Information System (INIS)

    Pang, S.H.H.; Alikhan, S.; Gu Jun

    2005-01-01

    The Qinshan Phase III (CANDU) Project, the largest-scale cooperative project between China and Canada, was completed in 2003 well in advance of the schedule and 10% under budget. The Third Qinshan (Phase III) Nuclear Power Plant (TQNPP) was built in record times: Unit 1 achieved commercial operation on December 31, 2002 and Unit 2 on July 20, 2003, 43 days and 115 days ahead of schedule respectively. Improvements in design and construction methods allowed Unit 1 to be constructed in 51.5 months from First Concrete to Criticality - a record in China for nuclear power plants. The key factors are project management and project management tools, quality assurance, construction methods, electronic documentation with configuration control that provides up-to-date on-line information, CADDS design linked with material management and control. New design and construction techniques were introduced by combining conventional AECL practices with working experiences in China. The most advanced tools and techniques for achieving optimum construction quality, schedule and cost were used. Successful application of advanced project management methods and tools has benefited TQNPC in its subsequent plant operation, and the Chinese contractors in advancing their capabilities in future nuclear projects in China as well as enhancing their opportunities internationally. Excellent co-operation and teamwork within the integrated TQNPC/AECL Commissioning Team with well documented QA program, process and procedures also contributed to the remarkable success of the Project. AECL's initial assessment, based on lessons learned, showed that the project schedule could readily be reduced to 66 months and the capital costs reduced by 25% for a replication project. AECL is building on this experience and successful results of TQNPP in its Advanced CANDU Reactor TM (ACR TM ) ** design. (authors)

  14. Managing projects for life cycle success : perfecting the process

    Energy Technology Data Exchange (ETDEWEB)

    Jenkins, A. [TransCanada PipeLines Ltd., Calgary, AB (Canada); Babuk, T. [Empress International Inc., Westwood, NJ (United States); Mohitpour, M. [Tempsys Pipeline Solutions Inc., Vancouver, BC (Canada)

    2004-07-01

    This paper presented a historical summary of traditional project management along with a discussion on the project management and development philosophy that can be used in a large infrastructure company that develops and operates its own projects and facilities. Two case studies from the experiences of TransCanada Pipelines Limited were also presented. It was suggested that companies seeking a first-rate reputation must maintain a long-term focus with emphasis on the improvement of the total process and harmony with the environment and community. This paper explained how project managers can create balance between the proponents, stakeholders, participants and the people and the environment while ensuring a cost effective quality product over time. Successful project managers were shown to understand and manage the components of scope, time, cost, quality, human resources, communication, risk, purchasing, safety and harmony with the community. Project development from the perspective of an owner-operator was presented with reference to consistency in approach and the decision making process. It was concluded that although project managers should focus on controlling and minimizing capital expenditures during project engineering and construction, the many elements that contribute to a project's value should also be recognized. 10 refs., 6 figs.

  15. Final Design Report for the RH LLW Disposal Facility (RDF) Project, Revision 3

    International Nuclear Information System (INIS)

    Austad, Stephanie Lee

    2015-01-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  16. Decontamination and dismantlement of the JANUS Reactor at Argonne National Laboratory-East. Project final report

    International Nuclear Information System (INIS)

    Fellhauer, C.R.; Clark, F.R.

    1997-10-01

    The decontamination and dismantlement of the JANUS Reactor at Argonne National Laboratory-East (ANL-E) was completed in October 1997. Descriptions and evaluations of the activities performed and analyses of the results obtained during the JANUS D and D Project are provided in this Final Report. The following information is included: objective of the JANUS D and D Project; history of the JANUS Reactor facility; description of the ANL-E site and the JANUS Reactor facility; overview of the D and D activities performed; description of the project planning and engineering; description of the D and D operations; summary of the final status of the JANUS Reactor facility based upon the final survey results; description of the health and safety aspects of the project, including personnel exposure and OSHA reporting; summary of the waste minimization techniques utilized and total waste generated by the project; and summary of the final cost and schedule for the JANUS D and D Project

  17. Final report for the 'Melt-Vessel Interactions' Project. European Union R and TD Program 4th Framework. MVI project final research report

    Energy Technology Data Exchange (ETDEWEB)

    Sehgal, B.R.; Dinh, T.N.; Nourgaliev, R.R.; Bui, V.A.; Green, J.; Kolb, G.; Karbojian, A.; Theerthan, S.A.; Gubaidulline, A. [Royal Inst. of Tech., Stockholm (Sweden). Div. of Nuclear Power Safety; Helle, M.; Kymaelaeinen, O.; Tuomisto, H. [IVO Power Engineering Ltd., Vantaa (Finland); Bonnet, J.M.; Rouge, S.; Narcoux, M.; Liegeois, A. [CEA - Grenoble (France); Turland, B.D.; Dobson, G.P. [AEA Technology plc, Dorchester (United Kingdom); Siccama, A. [ECN Nuclear Research, Petten (Netherlands); Ikonen, K. [VTT Energy, Helsinki (Finland); Parozzi, F. [ENEL - SRI/PAM/GRA, Segrate, MI (Italy); Kolev, N. [Siemens AG, Erlangen (Germany); Caira, M. [Univ. of Roma (Italy)

    1999-04-01

    The Melt Vessel Interaction (MVI) project is concerned with the consequences of the interactions that a core melt, generated during a postulated severe accident in a light water reactor, may have with the pressure vessel. In particular, the issues concerned with the failure of the vessel bottom head are the focus of the research. The specific objectives of the project are to obtain data and develop validated models, which could be applied to prototypic plants, and accident conditions, for resolution of issues related to the melt vessel interactions. The project work has been performed by nine partners having varied responsibility. The work included a large number of experiments, with simulant materials, whose observations and results are employed, respectively, to understand the physical mechanisms and to develop validated models. Applications to the prototypic geometry and conditions have also been performed. This report is volume 1 of the Final Report for the Project, in which a summary of the progress achieved in the experimental program is provided. We have, however, included some aspects of the modeling activities. Volume 2 of the Final report describes the progress achieved in the modeling program. The progress achieved in the experimental and modeling parts of the Project has led to the resolution of some of the issues of melt vessel interaction. Considerable progress was also achieved towards resolution of the remaining issues.

  18. Determining critical success factor of it project management and its ...

    African Journals Online (AJOL)

    Determining critical success factor of it project management and its influence towards the ... Journal of Fundamental and Applied Sciences ... respondents who have background in IT management in both public and private sector to gain ...

  19. Evaluating Managerial Styles for System Development Life Cycle Stages to Ensure Software Project Success

    Science.gov (United States)

    Kocherla, Showry

    2012-01-01

    Information technology (IT) projects are considered successful if they are completed on time, within budget, and within scope. Even though, the required tools and methodologies are in place, IT projects continue to fail at a higher rate. Current literature lacks explanation for success within the stages of system development life-cycle (SDLC) such…

  20. Experiences of success in industrial plants projects Experiencias exitosas en proyectos de plantas industriales

    Directory of Open Access Journals (Sweden)

    Nuria Forcada

    2008-08-01

    Full Text Available Success has always been the ultimate goal of construction projects, and different researchers have tried to evaluate it using different factors. Although specialized industrial construction usually involves very large scale projects with a high degree of technological complexity, research has mostly focused on civil and residential success factors. Experiences in Industrial Plants projects can help to improve project management and productivity in such a specialized sector. In this kind of projects, the contractual arrangement is one of the core differences on Project management and thus project success. This research seeks to develop a schema for classifying critical success factors as well as a methodology for evaluating projects. This methodology was adopted to evaluate critical success factors in Industrial Plants projects with different contractual arrangements. Findings suggest that although the construction stage has been the focus of many studies, the first stages are decisive for the success of projects; contract construction projects consider project planning to be more important; lump sum contract construction projects give greater importance to monitoring the benefits; bidding competition projects consider the available technology with greater rigor, etc. The results indicate that different Industrial Plants projects involve different success factors and management characteristics to achieve project objectives.En cualquier proyecto de construcción el principal objetivo es que sea exitoso y por lo tanto a lo largo del tiempo diferentes investigadores han tratado de evaluar los factores que influyen en el éxito de proyectos. En el ámbito de la construcción estas investigaciones se han enfocado principalmente a obras civiles y residenciales. Este artículo muestra resultados que provienen de proyectos de construcción industrial especializada que incluyen proyectos de gran escala con un alto grado de complejidad tecnol

  1. Leven estuary project. Fisheries Department final report

    OpenAIRE

    Bayliss, B.D.

    1997-01-01

    This is the report on the Leven estuary project: Fisheries Department final report produced by the Environment Agency North West in 1997. This report contains information about Leven estuary, river Leven catchment, river Crake catchment and the Ulverston Discharges. The Leven estuary is characterised by being very shallow, and shares the extremely variable tides and currents that characterize the whole of Morecambe Bay. There was little detailed knowledge of the impact on the Leven estuary, a...

  2. Student ownership of projects in an upper-division optics laboratory course: A multiple case study of successful experiences

    Science.gov (United States)

    Dounas-Frazer, Dimitri R.; Stanley, Jacob T.; Lewandowski, H. J.

    2017-12-01

    We investigate students' sense of ownership of multiweek final projects in an upper-division optics lab course. Using a multiple case study approach, we describe three student projects in detail. Within-case analyses focused on identifying key issues in each project, and constructing chronological descriptions of those events. Cross-case analysis focused on identifying emergent themes with respect to five dimensions of project ownership: student agency, instructor mentorship, peer collaboration, interest and value, and affective responses. Our within- and cross-case analyses yielded three major findings. First, coupling division of labor with collective brainstorming can help balance student agency, instructor mentorship, and peer collaboration. Second, students' interest in the project and perceptions of its value can increase over time; initial student interest in the project topic is not a necessary condition for student ownership of the project. Third, student ownership is characterized by a wide range of emotions that fluctuate as students alternate between extended periods of struggle and moments of success while working on their projects. These findings not only extend the literature on student ownership into a new educational domain—namely, upper-division physics labs—they also have concrete implications for the design of experimental physics projects in courses for which student ownership is a desired learning outcome. We describe the course and projects in sufficient detail that others can adapt our results to their particular contexts.

  3. Analysis of final year DVM research projects submitted to the Faculty ...

    African Journals Online (AJOL)

    This study analyzed the intellectual output of the undergraduate final year students. research projects submitted to the Faculty of Veterinary Medicine, Usmanu Danfodiyo University, Sokoto, from 1994 to 2004. The findings of the study show that a total of 194 research projects were produced within the period under study.

  4. What is ′Successful Development′ in Conservation and Development Projects? Insights from Two Nicaraguan Case Studies

    Directory of Open Access Journals (Sweden)

    Sandra K Znajda

    2014-01-01

    Full Text Available The lack of clear indications of success in integrated conservation and development projects has resulted in strong criticisms of these projects, and a call for the return to conservation activities that exclude local communities. Impeding this discussion is the lack of clarity around how project success is defined and measured in conservation and development projects, especially in terms of development goals. This study involved an in-depth exploration of two agroforestry-focused conservation and development projects in Nicaragua to provide insights into how success in reaching development goals is interpreted in such projects. In both projects, development was equated with increased household income, in contrast to more contemporary definitions that include aspects such as self-respect and social integration. Both projects in turn relied on income as a measure of development success, which ultimately lessened attention to impacts not easily measured quantitatively as well as participant perspectives on desired goals. The paper concludes with a discussion of implications for conservation practitioners; specifically the need for better alignment of project goals with contemporary explanations of development, and a need to move beyond primarily numerical indicators to measure change through an interdisciplinary approach in order to have a more comprehensive understanding of project impacts.

  5. Impact of Requirements Elicitation Processes on Success of Information System Development Projects

    Directory of Open Access Journals (Sweden)

    Bormane Līga

    2016-12-01

    Full Text Available Requirements articulating user needs and corresponding to enterprise business processes are a key to successful implementation of information system development projects. However, the parties involved in projects frequently are not able to agree on a common development vision and have difficulties expressing their needs. Several industry experts have acknowledged that requirements elicitation is one of the most difficult tasks in development projects. This study investigates the impact of requirements elicitation processes on project outcomes depending on the applied project development methodology.

  6. Leadership Quality for Malaysia Construction Leader to Steer a Success Construction Project

    Directory of Open Access Journals (Sweden)

    Ngah Nasaruddin Nur Ain

    2016-01-01

    Full Text Available Issues that dominate the construction industry for the long time such as time overrun, cost overrun, quality of construction and also safety during the construction process are difficult to resolve because of several factors involved which amongst them are leadership quality in the industry. Solving these issues can make the industry more sustainable in nature. This paper presents the need of leadership quality among construction parties involved to steer a construction project successfully. Literature work found that 11 leadership qualities to ensure construction project success. From the frequency analysis, five most dominant leadership qualities are team building, communication skill, visioning, planning & strategy skill, and decision making. Beside the literature, this study also seeks an opinion from a senior leader of a successful construction company regarding the need of these qualities amongst parties to resolve the construction issues. The results from an interview session indicate that he fully agreed with the need of all the qualities in the construction industry. This shows that there is a strong relationship between solving the issues with the leadership quality in ensuring construction project success. These qualities should be further investigated to acquire a better representation of leadership quality in resolving construction issues for Malaysia construction industry.

  7. Critical Success Factors of Mobile Application Development Projects: A Qualitative Study

    Directory of Open Access Journals (Sweden)

    Hamza Khastar

    2016-07-01

    Full Text Available This study seeks to identify the critical success factors of teams in the application-development project. To achieve this goal, a qualitative approach and content analysis was utilized. Semi-structured interviews with 14 developers and experts was performed for data collection. A systematic review of previous research shows that after 9 critical success factors. With the analysis interviews, the CSf's raised to 12; including user experience, strategy and project management, support and promotion, business models, planning and goal setting, financial and budgeting, marketing and customer needs, infrastructure, technical issues and design, contextual factors, teamwork and staffing. The results show that the customer experience, teamwork and contextual factors are core categories in the research paradigm model.

  8. Hospitality Occupational Skills Training Cooperative. Project HOST Final Report.

    Science.gov (United States)

    Northwest Educational Cooperative, Des Plaines, IL.

    Project HOST (Hospitality Occupational Skills Training) provided vocational training and employment opportunities in the hotel industry to disadvantaged adult minority populations in Chicago. It demonstrated a model for successful cooperation between the business sector and a public vocational education agency and developed and piloted a…

  9. 77 FR 62256 - Notice of Availability of the Final Environmental Impact Statement for the Mount Hope Project...

    Science.gov (United States)

    2012-10-12

    ... of the Final Environmental Impact Statement for the Mount Hope Project, Eureka County, NE AGENCY... prepared a Final Environmental Impact Statement (EIS) for the Mount Hope Project and by this notice is... Register. ADDRESSES: Copies of the Mount Hope Project Final EIS are available at the Battle Mountain...

  10. Final report of the inter institutional project ININ-CNSNS 'Source Terms specific for the CNLV'

    International Nuclear Information System (INIS)

    Anaya M, R.A.

    1991-02-01

    The purpose of the project inter institutional ININ-CNSNS 'Source Terms Specifies for the CNLV' it is the one of implanting in the computer CYBER (CDC 180-830) of the ININ, the 'Source Term Code Package' (STCP) and to make the operation tests and corresponding operation using the data of the sample problem, for finally to liberate the package, all time that by means of the analysis of the results it is consider appropriate. In this report the results of the are presented simulation of the sequence 'Energy Losses external' (Station blackout) and 'Lost total of CA with failure of the RCIC and success of the HPCS' both with data of the Laguna Verde Central. (Author)

  11. Investments on Pro-poor Development Projects on Goats: Ensuring Success for Improved Livelihoods.

    Science.gov (United States)

    Devendra, C

    2013-01-01

    The elements that determine the success of development projects on goats and the prerequisites for ensuring this are discussed in the context of the bewildering diversity of goat genetic resources, production systems, multifunctionality, and opportunities for responding to constraints for productivity enhancement. Key determinants for the success of pro-poor projects are the imperatives of realistic project design, resolution of priorities and positive impacts to increase investments and spur agricultural growth, and appropriate policy. Throughout the developing world, there exist 97% of the total world population of 921 million goats across all agro-ecological zones (AEZs), including 570 breeds and 64% share of the breeds. They occupy a very important biological and socio-economic niche in farming systems making significant multifunctional contributions especially to food, nutrition and financial security, stability of farm households, and survival of the poor in the rural areas. Definitions are given of successful and failed projects. The analyses highlighted in successful projects the value of strong participatory efforts with farmers and climate change. Climate change effects on goats are inevitable and are mediated through heat stress, type of AEZ, water availability, quantity and quality of the available feed resources and type of production system. Within the prevailing production systems, improved integrated tree crops - ruminant systems are underestimated and are an important pathway to enhance C sequestration. Key development strategies and opportunities for research and development (R and D) are enormous, and include inter alia defining a policy framework, resolution of priority constraints using systems perspectives and community-based participatory activities, application of yield-enhancing technologies, intensification, scaling up, and impacts. The priority for development concerns the rainfed areas with large concentrations of ruminants in which

  12. The LiveWire Project final report

    Energy Technology Data Exchange (ETDEWEB)

    Brown, C.D.; Nelson, T.T. [Enova Technology, San Diego, CA (United States); Kelly, J.C.; Dominguez, H.A. [Paragon Consulting Services, La Verne, CA (United States)

    1997-10-01

    Utilities across the US have begun pilot testing a variety of hardware and software products to develop a two-way communications system between themselves and their customers. Their purpose is to reduce utility operating costs and to provide new and improved services for customers in light of pending changes in the electric industry being brought about by deregulation. A consortium including utilities, national labs, consultants, and contractors, with the support of the Department of Energy (DOE) and the Electric Power Research Institute (EPRI), initiated a project that utilized a hybrid fiber-coax (HFC) wide-area network integrated with a CEBus based local area network within the customers home. The system combined energy consumption data taken within the home, and home automation features to provide a suite of energy management services for residential customers. The information was transferred via the Internet through the HFC network, and presented to the customer on their personal computer. This final project report discusses the design, prototype testing, and system deployment planning of the energy management system.

  13. Factors Affecting Process Innovation Teams’ Learning and Their Impact on the Success of the Process Innovation Projects

    Directory of Open Access Journals (Sweden)

    İbrahim H. Seyrek

    2007-06-01

    Full Text Available Based on 145 process innovation teams, we have studied factors supporting team learning and their impact on the success of the process innovation projects. As a result, we have found that team vision, recording and reviewing project related information, filing, following a structural development process and co-location of team members are factors supporting team learning and project success. Also, two dimensions of learning, information acquisition and information implementation, are positively related to the success of the process innovation projects

  14. Successful completion of a RCRA closure for the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Lippitt, J.M.; Kolthoff, K.

    1995-01-01

    This paper discusses the successful completion of a RCRA (Resource Conservation and Recovery Act) closure of a HF (hydrofluoric acid) tank car at FEMP, which is on the national priorities list of hazardous waste sites and is undergoing CERCLA remediation. The HF tank car closure was conducted by FERMCO. Through a combination of sound planning and team work, the HF tank car was closed safely and ahead of schedule. During > 22,000 hr field work required for construction modifications and neutralization of 9,600 gallons of HF and decontamination rinseates, there were no OSHA recordable incidents. The system design avoided additional costs by maximizing use of existing equipment and facilities. This successful closure of the HF tank car demonstrates FEMP's commitment to reducing risks and cleaning up the facility in a manner consistent with objectives of RCRA regulations and the Ohio EPA hazardous waste rules. This in turn facilitated ongoing negotiations with Ohio EPA to integrate RCRA closure and the ongoing CERCLA remediation activities. This paper addresses why the unit was clean closed under an approved RCRA Closure Plan. Integration of EPA regulations for RCRA and CERCLA programs and the DOE-Orders impacting design, construction and operation of an acid neutralization system is also reviewed. The paper concludes with a discussion of lessons learned in the process in preparing the closure plant and through final project close out

  15. Factors affecting the success of development projects : A behavioral perspective

    NARCIS (Netherlands)

    Aga, Deribe Assefa

    2016-01-01

    This dissertation sought to examine behavioral-related critical success factors in the context of Non-Governmental Organization (NGO) sector development projects in Ethiopia. The dissertation applied both a cross-sectional survey design and an experimental design in separate settings, and it is

  16. El Paso County Geothermal Project at Fort Bliss. Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Lear, Jon [Ruby Mountain Inc., Salt Lake City, UT (United State); Bennett, Carlon [Ruby Mountain Inc., Salt Lake City, UT (United State); Lear, Dan [Ruby Mountain Inc., Salt Lake City, UT (United State); Jones, Phil L. [Ruby Mountain Inc., Salt Lake City, UT (United State); Burdge, Mark [Evergreen Clean Energy Management, Provo, UT (United States); Barker, Ben [Evergreen Clean Energy Management, Provo, UT (United States); Segall, Marylin [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Moore, Joseph [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Nash, Gregory [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Jones, Clay [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Simmons, Stuart [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Taylor, Nancy [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.

    2016-02-01

    The El Paso County Geothermal Project at Fort Bliss was an effort to determine the scale and scope of geothermal resources previously identified on Fort Bliss’ McGregor Range in southern Otero County, New Mexico. The project was funded with a $5,000,000 grant to El Paso County from the U.S. Department of Energy (DOE) as part of the American Recovery and Reinvestment Act of 2009 and a $4,812,500 match provided by private sector partners. The project was administered through the DOE Golden Field Office to awardee El Paso County. The primary subcontractor to El Paso County and project Principal Investigator - Ruby Mountain Inc. (RMI) of Salt Lake City, Utah - assembled the project team consisting of Evergreen Clean Energy Management (ECEM) of Provo, Utah, and the Energy & Geoscience Institute at the University of Utah (EGI) in Salt Lake City, UT to complete the final phases of the project. The project formally began in May of 2010 and consisted of two preliminary phases of data collection and evaluation which culminated in the identification of a drilling site for a Resource Confirmation Well on McGregor Range. Well RMI 56-5 was drilled May and June 2013 to a depth of 3,030 ft. below ground level. A string of slotted 7 inch casing was set in 8.75 inch hole on bottom fill at 3,017 ft. to complete the well. The well was drilled using a technique called flooded reverse circulation, which is most common in mineral exploration. This technique produced an exceptionally large and complete cuttings record. An exciting development at the conclusion of drilling was the suspected discovery of a formation that has proven to be of exceptionally high permeability in three desalinization wells six miles to the south. Following drilling and preliminary testing and analysis, the project team has determined that the McGregor Range thermal anomaly is large and can probably support development in the tens of megawatts.

  17. Prototypical consolidation demonstration project - Final fuel recommendation report

    International Nuclear Information System (INIS)

    Piscitella, R.R.; Paskey, W.R.

    1987-01-01

    The Prototypical Consolidation Demonstration (PCD) Project will, in its final phase, conduct a demonstration of the equipment's ability to consolidate actual spent commercial fuel. Since budget and schedule limitations do not allow this demonstration to include all types of fuel assemblies, a selection process was utilized to identify the fuel types that would represent predominate fuel inventories and that would demonstrate the equipment's abilities. The Pressurized Water Reactor (PWR) fuel assemblies that were suggested for use in the PCD Project Hot Demonstration were Babcock and Wilcox (B and W) 15 x 15's, and Westinghouse (WE) 15 x 15's. The Boiling Water Reactor (BWR) fuel suggested was the General Electric (GE) 8 x 8

  18. Quantum theory of successive projective measurements

    International Nuclear Information System (INIS)

    Johansen, Lars M.

    2007-01-01

    We show that a quantum state may be represented as the sum of a joint probability and a complex quantum modification term. The joint probability and the modification term can both be observed in successive projective measurements. The complex modification term is a measure of measurement disturbance. A selective phase rotation is needed to obtain the imaginary part. This leads to a complex quasiprobability: The Kirkwood distribution. We show that the Kirkwood distribution contains full information about the state if the two observables are maximal and complementary. The Kirkwood distribution gives another picture of state reduction. In a nonselective measurement, the modification term vanishes. A selective measurement leads to a quantum state as a non-negative conditional probability. We demonstrate the special significance of the Schwinger basis

  19. Project radon final report

    International Nuclear Information System (INIS)

    Ekholm, S.; Rossby, U.

    1990-01-01

    The main radiation problem in Sweden is due to radon in dwellings. At the Swedish State Power Board, R, D and D about radon has been going on since 1980. The work has concentrated on the important questions: How to find building with enhanced radon levels?; How to accurately decide on measures that will give adequate cleaning-up results, using appropriate measurement procedures; What cleaning-up effect is possible to achieve with an electro-filter?; and What cleaning-up effects are possible to achieve with different types of ventilation systems? The R, D and D-work, has been pursued in cooperation with universities of technology in Denmark and Finland, equipment manufacturers, consultants and authorities concerned. It was decided in December 1986 to give an offer to some SSPB-employees to investigate the radon situation of their dwellings, in order to test methods of measurement and cleaning-up under realistic conditions and to develop the methods to commercial maturity. The investigation was named 'Project Radon' and was carried out in three years with costs amounting to 1 M dollars. During the project less comprehensive radon measurements, named 'trace-measurements' were undertaken in about 1300 dwellings and more elaborate measurements, leading to suggestions of actions to be taken, in about 400 dwellings. Out of the suggestions, about 50 are carried out including control measurement after actions taken. The control measurement have shown that the ability to suggest appropriate actions is very successful - in just one case was a minor additional action necessary. The high reliability is achieved by always doing elaborate measurements before suggested mitigation method is decided on. (authors)

  20. From Project Management Capabilities to ERP Implementation Success: The Mediating Effect of IT Executives' Capabilities

    Science.gov (United States)

    Touir, Maatallah

    2016-01-01

    Enterprise resource planning project implementation success is necessary for organizations to enhance productivity and achieve operational efficiency; however, the failure rates of ERP projects remain high, ranging between 10% and 90%, and costing organizations $500,000 to $300 million. The problem addressed in this study was the low success rate…

  1. Energy final consumption projection - 1985/2005 - basic scenery - Minas Gerais State

    International Nuclear Information System (INIS)

    1989-03-01

    A projection of the final energy consumption study for the Minas Gerais State until 2005 year is presented. The conclusion of this projection shows a increasing of 108,8% for the total energy. The industries will be response for 62,0% and the transport sector will use 20,7% of the total energy in 2005. (L.J.C.)

  2. 76 FR 64085 - Post-2014 Resource Pool-Loveland Area Projects, Final Power Allocation

    Science.gov (United States)

    2011-10-17

    ... Resource Pool; Loveland Area Projects, General Eligibility Criteria. The resource pool for capacity and... transmission in Kansas. Final allocation of the Post-2014 Resource Pool; Loveland Area Projects, is contingent...

  3. Key factors of project success in family small and medium-sized companies: the theoretical review

    Directory of Open Access Journals (Sweden)

    Sinisa Arsic

    2017-10-01

    Full Text Available The paper proposes a systematization of the key success factors of projects, through the theoretical review of family-owned companies operating in the EU market. It is the small and medium companies that in their own way contribute to the overall success of the national economy in terms of economic activity, increased employment, development activities and defining better business environment. The theoretical review observed numerous studies of family businesses, and the contribution of this work is in the systematization of the results of previous research – over three horizons, i.e., over the role of managers in the creation of successful projects (or owner if it is a family enterprise, institutional support for companies in Serbia and the EU, specific industries and the parent (regional markets where a family company operates. Project management, as a general representation of the concept of implementation of strategic and operational endeavors, contains many specifics in terms of critical success factors of projects depending on the environment in which they are implemented. The goal of the paper is reflected in the identification and presentation of critical success factors of projects implemented in family companies. The paper concludes with a discussion of the research results in relation to the existing, similar research studies, as well as with the announcement of future research, which will examine the conclusions drawn on a real sample.

  4. Final report on the maintenance asset management project : phase II.

    Science.gov (United States)

    2013-07-01

    Iowa Department of Transportation (IA DOT) is finalizing research to streamline field inventory/inspection of culverts by Maintenance and Construction staff while maximizing the use of tablet technologies. The project began in 2011 to develop some ne...

  5. Student ownership of projects in an upper-division optics laboratory course: A multiple case study of successful experiences

    Directory of Open Access Journals (Sweden)

    Dimitri R. Dounas-Frazer

    2017-12-01

    Full Text Available We investigate students’ sense of ownership of multiweek final projects in an upper-division optics lab course. Using a multiple case study approach, we describe three student projects in detail. Within-case analyses focused on identifying key issues in each project, and constructing chronological descriptions of those events. Cross-case analysis focused on identifying emergent themes with respect to five dimensions of project ownership: student agency, instructor mentorship, peer collaboration, interest and value, and affective responses. Our within- and cross-case analyses yielded three major findings. First, coupling division of labor with collective brainstorming can help balance student agency, instructor mentorship, and peer collaboration. Second, students’ interest in the project and perceptions of its value can increase over time; initial student interest in the project topic is not a necessary condition for student ownership of the project. Third, student ownership is characterized by a wide range of emotions that fluctuate as students alternate between extended periods of struggle and moments of success while working on their projects. These findings not only extend the literature on student ownership into a new educational domain—namely, upper-division physics labs—they also have concrete implications for the design of experimental physics projects in courses for which student ownership is a desired learning outcome. We describe the course and projects in sufficient detail that others can adapt our results to their particular contexts.

  6. Success and failure factors for e-government projects: A case from Egypt

    Directory of Open Access Journals (Sweden)

    Hatem Elkadi

    2013-07-01

    Full Text Available E-government implementations in developing countries still face difficulties, leading to a large failure ratio. This is too high a cost for developing countries. Analysis of the reasons behind success and failure of e-government projects is still an interesting domain of investigation. Several approaches were advanced and success and failure factors have been stipulated, but factors pertinent to Public Administration have yet to be investigated and analyzed. This work builds on the results of earlier research, analyzing the factors behind the change in performance of the different sites of a specific project, reasons of their original success, and the relapse of one site. It reviews in detail the factors advanced by previous works and integrates for the first time the results obtained by 3 different research methodologies. It clarifies the causality between different factors presumed to individually affect the e-government implementations, thus enabling the disambiguation between the main and secondary less effective causes of failure. The success and failure factors significance and relative importance are identified, revealing the recommended track of action for the set-back remedy.

  7. Project No. 8 - Final decommissioning plan

    International Nuclear Information System (INIS)

    2000-01-01

    Ignalina NPP should prepare the final Ignalina NPP unit 1 decommissioning plan by march 31, 2002. This plan should include the following : description of Ignalina NPP and the Ignalina NPP boundary that could be influenced by decommissioning process; decommissioning strategy selected and a logical substantiation for this selection; description of the decommissioning actions suggested and a time schedule for the actions to be performed; conceptual safety and environmental impact assessment covering ionizing radiation and other man and environment impact; description of the environmental monitoring program proposed during decommissioning process; description of the waste management proposed; assessment of decommissioning expenses including waste management, accumulated funds and other sources. Estimated project cost - 0.75 M EURO

  8. N Area Final Project Program Plan

    International Nuclear Information System (INIS)

    Day, R.S.; Duncan, G.M; Trent, S.J.

    1998-07-01

    The N Area Final Project Program Plan is issued for information and use by the U.S. Department of Energy (DOE), the Environmental Restoration Contractor (ERC) for the Hanford Site, and other parties that require workscope knowledge for the deactivation of N Reactor facilities and remediation of the 100-N Area. This revision to the program plan contains the updated critical path schedule to deactivate N Reactor and its supporting facilities, cleanout of the N Reactor Fuel Storage Basin (105-N Basin), and remediate the 100-N Area. This document reflects notable changes in the deactivation plan for N Reactor, including changes in deactivation status, the N Basin cleanout task, and 100-N Area remediation

  9. Examining the Interrelationship among Critical Success Factors of Public Private Partnership Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    Shiying Shi

    2016-12-01

    Full Text Available Examining the interrelationships among critical success factors (CSFs for public private partnership (PPP projects is of importance for improving PPP project performance and maintaining the sustainability of PPP project implementation. Previous studies mostly focused on the identification of the CSFs for PPP projects; limited studies investigated the interrelationships among CSFs. Hence, the research objectives are (a to determine the interrelationships among CSFs of PPP projects taking into account the public and (b to identify influence paths contributing to take advantage of CSFs in the process of PPP implementation. A literature review and expert interviews were adopted to construct the CSFs framework; nine hypotheses were constructed and tested by the structural equation modelling (SEM based on the data collected from a questionnaire survey. This research reveals that the relationship between public and private partners is the leader-follower relationship, not the partnership relationship, in PPP projects, indicating that the responsibilities, power or resources existing among partners are very unequal. It also highlights that public involvement has a negative effect on the process of service provisions, and costs and risks exist in the process of public involvement in PPP projects. The determined interrelationships among CSFs will contribute to the sustainability and success of a PPP project.

  10. Investments on Pro-poor Development Projects on Goats: Ensuring Success for Improved Livelihoods

    Directory of Open Access Journals (Sweden)

    C. Devendra

    2013-01-01

    Full Text Available The elements that determine the success of development projects on goats and the prerequisites for ensuring this are discussed in the context of the bewildering diversity of goat genetic resources, production systems, multifunctionality, and opportunities for responding to constraints for productivity enhancement. Key determinants for the success of pro-poor projects are the imperatives of realistic project design, resolution of priorities and positive impacts to increase investments and spur agricultural growth, and appropriate policy. Throughout the developing world, there exist 97% of the total world population of 921 million goats across all agro-ecological zones (AEZs, including 570 breeds and 64% share of the breeds. They occupy a very important biological and socio-economic niche in farming systems making significant multifunctional contributions especially to food, nutrition and financial security, stability of farm households, and survival of the poor in the rural areas. Definitions are given of successful and failed projects. The analyses highlighted in successful projects the value of strong participatory efforts with farmers and climate change. Climate change effects on goats are inevitable and are mediated through heat stress, type of AEZ, water availability, quantity and quality of the available feed resources and type of production system. Within the prevailing production systems, improved integrated tree crops - ruminant systems are underestimated and are an important pathway to enhance C sequestration. Key development strategies and opportunities for research and development (R and D are enormous, and include inter alia defining a policy framework, resolution of priority constraints using systems perspectives and community-based participatory activities, application of yield-enhancing technologies, intensification, scaling up, and impacts. The priority for development concerns the rainfed areas with large concentrations of

  11. Decontamination and decommissioning of the Experimental Boiling Water Reactor (EBWR): Project final report, Argonne National Laboratory

    International Nuclear Information System (INIS)

    Fellhauer, C.R.; Boing, L.E.; Aldana, J.

    1997-03-01

    The Final Report for the Decontamination and Decommissioning (D ampersand D) of the Argonne National Laboratory - East (ANL-E) Experimental Boiling Water Reactor (EBWR) facility contains the descriptions and evaluations of the activities and the results of the EBWR D ampersand D project. It provides the following information: (1) An overall description of the ANL-E site and EBWR facility. (2) The history of the EBWR facility. (3) A description of the D ampersand D activities conducted during the EBWR project. (4) A summary of the final status of the facility, including the final and confirmation surveys. (5) A summary of the final cost, schedule, and personnel exposure associated with the project, including a summary of the total waste generated. This project report covers the entire EBWR D ampersand D project, from the initiation of Phase I activities to final project closeout. After the confirmation survey, the EBWR facility was released as a open-quotes Radiologically Controlled Area,close quotes noting residual elevated activity remains in inaccessible areas. However, exposure levels in accessible areas are at background levels. Personnel working in accessible areas do not need Radiation Work Permits, radiation monitors, or other radiological controls. Planned use for the containment structure is as an interim transuranic waste storage facility (after conversion)

  12. Chinese villages and their sustainable future: the European Union-China-Research Project "SUCCESS".

    Science.gov (United States)

    Dumreicher, Heidi

    2008-04-01

    be implemented during the research period. This work made an important impact on community thinking within these villages. However, it can also be seen as contributing to the dramatically changing development process in China, by finding a balance between traditional and contemporary approaches. In particular, the approach demonstrated a new, inter-disciplinary and trans-disciplinary negotiation processes whereby the local knowledge and the expert knowledge find common ground and outcomes. The article follows the hypothesis that only comprehensive concepts can contribute to an upgraded living standard, where living spaces and rural life should be recognised and esteemed in the future as a complement to urban lifestyles within the Chinese society. Innovative knowledge generation-such as the "systemic structure constellation" technique or the systems model approach-helped to bring out latent needs, hopes and potential of the villagers. Besides the practical usage of these implemented projects, the process leading there showed the stakeholders their own fields of action. One major impact of these projects is the visibility of the results, which is crucial for villagers' awareness, their self-confidence and their experience with a successful participation in decision-making processes. Another impact is the potential for replicating results of sustainability-oriented patterns throughout China, especially as three of the villages have been nominated official model villages. Scenarios of a sustainable future for Chinese villages were the objective of the SUCCESS project. The first condition for this future is the question whether they can persist into the future-and to picture the importance of the rural environment and living space as a relevant element of Chinese life that needs to get a better image and more attention from the authorities and from the public opinion. Therefore, the final sentence that the whole research consortium, composed of 17 scientific institutions

  13. Bevalac injector final stage RF amplifier upgrades

    International Nuclear Information System (INIS)

    Howard, D.; Calvert, J.; Dwinell, R.; Lax, J.; Lindner, A.; Richter, R.; Ridgeway, W.

    1991-01-01

    With the assistance of the DOE In-house Energy Management Program, the Bevalac injector final stage RF amplifier systems have been successfully upgraded to reduce energy consumption and operating costs. This recently completed project removed the energy-inefficient plate voltage modulator circuits that were used in conjunction with the final stage RF amplifiers. Construction, design, and operating parameters are described in detail

  14. Modelling the critical success factors of agile software development projects in South Africa

    Directory of Open Access Journals (Sweden)

    Tawanda B. Chiyangwa

    2017-10-01

    Full Text Available Background: The continued in failure of agile and traditional software development projects have led to the consideration, attention and dispute to critical success factors that are the aspects which are most vital to make a software engineering methodology fruitful. Although there is an increasing variety of critical success factors and methodologies, the conceptual frameworks which have causal relationship are limited. Objective: The objective of this study was to identify and provide insights into the critical success factors that influence the success of software development projects using agile methodologies in South Africa. Method: Quantitative method of collecting data was used. Data were collected in South Africa through a Web-based survey using structured questionnaires. Results: These results show that organisational factors have a great influence on performance expectancy characteristics. Conclusion: The results of this study discovered a comprehensive model that could provide guidelines to the agile community and to the agile professionals.

  15. Success Rates by Software Development Methodology in Information Technology Project Management: A Quantitative Analysis

    Science.gov (United States)

    Wright, Gerald P.

    2013-01-01

    Despite over half a century of Project Management research, project success rates are still too low. Organizations spend a tremendous amount of valuable resources on Information Technology projects and seek to maximize the utility gained from their efforts. The author investigated the impact of software development methodology choice on ten…

  16. 78 FR 45268 - Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Final...

    Science.gov (United States)

    2013-07-26

    ...] Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Final Environmental...) Ocotillo Sol Solar Project in Imperial County, California, and by this notice is announcing its... Ocotillo Sol Solar Project Final EIS/Proposed CDCA Plan Amendment have been sent to affected Federal, State...

  17. The Elder Abuse Prevention Project, Phase Two, Three and Four. Final Report.

    Science.gov (United States)

    Regina Univ. (Saskatchewan). Univ. Extension. Seniors Education Centre.

    This document presents the final report from an educational and community development program designed to raise awareness about the abuse and neglect of the elderly. The Elder Abuse Prevention Project is briefly described in terms of project goals, objectives, the model used, the target groups served, and the evaluation processes employed. It is…

  18. Examining Success Factors Related to ERP Implementations in Higher Education Shared Services Projects

    Science.gov (United States)

    Stoyanoff, Dawn Galadriel Pfeiffer

    2012-01-01

    This study examined the enterprise resource planning (ERP) implementations that utilized a shared services model in higher education. The purpose of this research was to examine the critical success factors which were perceived to contribute to project success. This research employed a quantitative non-experimental correlational design and the…

  19. THz transceiver characterization : LDRD project 139363 final report.

    Energy Technology Data Exchange (ETDEWEB)

    Nordquist, Christopher Daniel; Wanke, Michael Clement; Cich, Michael Joseph; Reno, John Louis; Fuller, Charles T.; Wendt, Joel Robert; Lee, Mark; Grine, Albert D.

    2009-09-01

    LDRD Project 139363 supported experiments to quantify the performance characteristics of monolithically integrated Schottky diode + quantum cascade laser (QCL) heterodyne mixers at terahertz (THz) frequencies. These integrated mixers are the first all-semiconductor THz devices to successfully incorporate a rectifying diode directly into the optical waveguide of a QCL, obviating the conventional optical coupling between a THz local oscillator and rectifier in a heterodyne mixer system. This integrated mixer was shown to function as a true heterodyne receiver of an externally received THz signal, a breakthrough which may lead to more widespread acceptance of this new THz technology paradigm. In addition, questions about QCL mode shifting in response to temperature, bias, and external feedback, and to what extent internal frequency locking can improve stability have been answered under this project.

  20. The Dust Management Project: Final Report

    Science.gov (United States)

    Hyatt, Mark J.; Straka, Sharon

    2011-01-01

    A return to the Moon to extend human presence, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere, will require investment in developing new technologies and capabilities to achieve affordable and sustainable human exploration. From the operational experience gained and lessons learned during the Apollo missions, conducting longterm operations in the lunar environment will be a particular challenge, given the difficulties presented by the unique physical properties and other characteristics of lunar regolith, including dust. The Apollo missions and other lunar explorations have identified significant lunar dust-related problems that will challenge future mission success. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems and human explorers. The Dust Management Project (DMP) is tasked with the evaluation of lunar dust effects, assessment of the resulting risks, and development of mitigation and management strategies and technologies related to Exploration Systems architectures. To this end, the DMP supports the overall goal of the Exploration Technology Development Program (ETDP) of addressing the relevant high priority technology needs of multiple elements within the Constellation Program (CxP) and sister ETDP projects. Project scope, approach, accomplishments, summary of deliverables, and lessons learned are presented.

  1. Designing a Successful Transportation Project: Lessons Learned from the Clean Cities American Recovery and Reinvestment Act Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, K.; Singer, M.

    2017-09-01

    The largest source of funding for alternative fuel vehicle and infrastructure projects in the U.S. Department of Energy's Clean Cities program's history came from the American Recovery and Reinvestment Act (Recovery Act). In 2009, the 25 cost-share projects totaled nearly $300 million in federal government investment. This effort included the involvement of 50 Clean Cities coalitions and their nearly 700 stakeholder partners who provided an additional $500 million in matching funds to support projects in their local communities. In total, those 25 projects established 1,380 alternative fueling stations and put more than 9,000 alternative fuel and advanced technology vehicles on the road. Together, these projects displaced 154 million gasoline gallon equivalents (GGE) of petroleum and averted 254,000 tons of greenhouse gas (GHG) emissions, while supporting U.S. energy independence and contributing to regional economic development. During post-project interviews, project leaders consistently cited a number of key components - ranging from technical and logistical factors, to administrative capabilities - for accomplishing an effective and impactful project. This report summarizes the high-level project design and administrative considerations for conducting a successful transportation project.

  2. Designing a Successful Transportation Project: Lessons Learned from the Clean Cities American Recovery and Reinvestment Act Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, Kay L. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Singer, Mark R. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-09-28

    The largest source of funding for alternative fuel vehicle and infrastructure projects in the U.S. Department of Energy's Clean Cities program's history came from the American Recovery and Reinvestment Act (Recovery Act). In 2009, the 25 cost-share projects totaled nearly $300 million in federal government investment. This effort included the involvement of 50 Clean Cities coalitions and their nearly 700 stakeholder partners who provided an additional $500 million in matching funds to support projects in their local communities. In total, those 25 projects established 1,380 alternative fueling stations and put more than 9,000 alternative fuel and advanced technology vehicles on the road. Together, these projects displaced 154 million gasoline gallon equivalents (GGE) of petroleum and averted 254,000 tons of greenhouse gas (GHG) emissions, while supporting U.S. energy independence and contributing to regional economic development. During post-project interviews, project leaders consistently cited a number of key components - ranging from technical and logistical factors, to administrative capabilities - for accomplishing an effective and impactful project. This report summarizes the high-level project design and administrative considerations for conducting a successful transportation project.

  3. Transformational leadership and project success : The mediating role of team-building

    NARCIS (Netherlands)

    Aga, Deribe Assefa; Noorderhaven, Niels; Vallejo, Bertha

    2016-01-01

    Although the effect of transformational leadership on project success is empirically supported, less is known about the mechanisms that explain this effect. To address this issue, we propose the mediating role of team-building as a possible explanation of the relationship between transformational

  4. A View on a Successful International Educational Project in Software Engineering

    Directory of Open Access Journals (Sweden)

    Zoran Budimac

    2012-01-01

    Full Text Available In this paper, a successful and fruitful joint project will be presented. The project joins participants from 9 countries and from 15 universities. Since it started in 2001, this project entitled “Software Engineering: Computer Science Education and Research Cooperation” helped participants to gain excellent, up to date educational material, apply modern teaching methods, exchange experiences with other participants, and work jointly on the further development of lectures, case-studies, assignments, examination questions, and other necessary elements of a course. Project works under auspices of Stability Pact of South-Eastern Europe, and is supported by DAAD. The project started with the creation of a common beginning course in “Software Engineering”, but over time it grew and the number of other courses was developed. Finished almost completely are the courses in “Object-oriented programming”, “Software Project Management”, “Advanced Compiler Construction”, and “Data Structures and Algorithms”, and some other courses are under development. Aside from the educational collaboration, project members also developed good scientific cooperation, and published several research papers.

  5. Hellsgate Winter Range : Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  6. Hellsgate Winter Range: Wildlife mitigation project. Final environmental assessment

    International Nuclear Information System (INIS)

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs

  7. Zachary-Fort Lauderdale pipeline construction and conversion project: final supplement to final environmental impact statement. Docket No. CP74-192

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-05-01

    This Final Supplement to the Final Environmental Impact Statement (Final Supplement) evaluates the economic, engineering, and environmental aspects of newly developed alternatives to an abandonment/conversion project proposed by Florida Gas Transmission Company (Florida Gas). It also updates the staff's previous FEIS and studies revisions to the original proposal. Wherever possible, the staff has adopted portions of its previous FEIS in lieu of reprinting portions of that analysis which require no change. 60 references, 8 figures, 35 tables.

  8. Using the partial least squares (PLS) method to establish critical success factor interdependence in ERP implementation projects

    OpenAIRE

    Esteves, José; Pastor Collado, Juan Antonio; Casanovas Garcia, Josep

    2002-01-01

    This technical research report proposes the usage of a statistical approach named Partial Least squares (PLS) to define the relationships between critical success factors for ERP implementation projects. In previous research work, we developed a unified model of critical success factors for ERP implementation projects. Some researchers have evidenced the relationships between these critical success factors, however no one has defined in a form...

  9. Geothermal Direct Use Program Opportunity Notice Projects Lessons Learned Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Lunis, B.C.

    1986-01-01

    The use of geothermal energy for direct-use applications was aided through the development of a number of successful field experiment projects funded on a cost-shared basis by the US Department of Energy, Division of Geothermal Technology. This document provides a summary of the projects administered by the US Department of Energy's Idaho Operations Office and technically monitored through the Idaho National Engineering Laboratory (EG and G Idaho, Inc.). An overview of significant findings and conclusions is provided, as are project descriptions and activities, resource development, design, construction, and operational features. Legal and institutional considerations are also discussed.

  10. Investment feasibility tracking: the importance of measuring and tracking the success level of the project during commercialization phase

    Science.gov (United States)

    Saputra, Y. A.; Setyaningtyas, V. E. D.; Latiffianti, E.; Wijaya, S. H.; Ladamay, O. S. A.

    2018-04-01

    Measuring project success level is a challenging activity. This area of works has attracted many researchers to look deeper into the method of measurement, success factor identification, risk management, and many others relevant topics. However, the project management scope is limited until the project handover stage. After a project handover, the control of a project management changes from Project Management Team to the project owner/commercialization team. From an investor’s point of view, the success of a project delivery needs to be followed by the success of commercialization phase. This paper aims to present an approach on how we track and measure the progress and success level of a project investment in the commercialization phase. This is an interesting topic which probably often being forgotten in many practical case. Our proposed concept modify Freeman and Beale concept by estimating the variance between the Planned Net Present Value / Annual Worth (as it is in the Feasibility Study Document) and the Actual Net Present Value / Annual Worth (until the point time of evaluation). The gap will lead us to the next analysis and give us some important information, especially exposing whether our project investment performs better than the planning or underperformed. Some corrective actions can be suggested based on the provided information. Practical cases to exercise the concept is also provided and discussed; one case in a property sector in the middle of commercialization phase, and another case in a Power Plant investment approaching the end of commercialization phase.

  11. Northeast Oregon Hatchery Project, Final Siting Report.

    Energy Technology Data Exchange (ETDEWEB)

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  12. District heating demonstration project. Swiecie, Poland. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    In January 1997 the district heating company in Swiecie, Poland, was donated DKK 1.3 Mio. as a part of the environmental related energy sector programme by the Danish government for a demonstration project. The Danish consultancy company Carl Bro a/s was appointed to conduct the work. The project was finished in January 1999. The present final report outlines the activities of the demonstration project. The activities of the project were several. Carl Bro a/s elaborated tender documents and procured 79 heat meters for all the substrations in the city in order to prepare for the new energy law and a changed tariff system which was introduced in January 1999. Carl Bro a/s further supported ZEC Swiecie in the development of their new tariff system through information from Danish district heating companies. The demonstration project was designed in the first phase of the project. During the design period one engineer from Swiecie participated in a study tour to Denmark to learn about technical solutions to present problems in Poland. The training course focused on preparation of hot tap water. The site for the demonstation project was in the centre of Swiecie in a housing society located in Wojska Polskiego. The blocks 75 and 75A were selected for modernisation of the substations, and block no. 73 was appointed as a reference block in which only a heat meter was installed. Further, block 75A was equipped with thermostatic valves at all the radiators in the flats. The registered savings during the monitoring period were between 7% and 14%, and an increased comfort in the flats was observed. The housing society`s board of directors were so pleased with the project that by their initiative block no. 77 was refurbished in the same way as the blocks covered by the demonstration project. However, the activities were extended with individual heat meters and the introduction of a new tariff system for the block. The energy savings from this project were substantial, and today

  13. The AGP-Project conceptual design for a Spanish HLW final disposal facility

    International Nuclear Information System (INIS)

    Biurrun, E.; Engelmann, H.-J.; Huertas, F.; Ulibarri, A.

    1992-01-01

    Within the framework of the AGP Project a Conceptual Design for a HLW Final Disposal Facility to be eventually built in an underground salt formation in Spain has been developed. The AGP Project has the character of a system analysis. In the current project phase I several alternatives has been considered for different subsystems and/or components of the repository. The system variants, developed to such extent as to allow a comparison of their advantages and disadvantages, will allow the selection of a reference concept, which will be further developed to technical maturity in subsequent project phases. (author)

  14. Success probability orientated optimization model for resource allocation of the technological innovation multi-project system

    Institute of Scientific and Technical Information of China (English)

    Weixu Dai; Weiwei Wu; Bo Yu; Yunhao Zhu

    2016-01-01

    A success probability orientated optimization model for resource al ocation of the technological innovation multi-project system is studied. Based on the definition of the technological in-novation multi-project system, the leveling optimization of cost and success probability is set as the objective of resource al ocation. The cost function and the probability function of the optimization model are constructed. Then the objective function of the model is constructed and the solving process is explained. The model is applied to the resource al ocation of an enterprise’s technological innovation multi-project system. The results show that the pro-posed model is more effective in rational resource al ocation, and is more applicable in maximizing the utility of the technological innovation multi-project system.

  15. Final Report for completed IPP-0110 and 0110A Projects: 'High Energy Ion Technology of Interfacial Thin Film Coatings for Electronic, Optical and Industrial Applications'

    International Nuclear Information System (INIS)

    Brown, Ian

    2009-01-01

    The DOE-supported IPP (Initiatives for Proliferation Prevention) Project, IPP-0110, and its accompanying 'add-on project' IPP-0110A, entitled 'High Energy Ion Technology of Interfacial Thin Film Coatings for Electronic, Optical and Industrial Applications' was a collaborative project involving the Lawrence Berkeley National Laboratory (LBNL) as the U.S. DOE lab; the US surface modification company, Phygen, Inc., as the US private company involved; and the High Current Electronics Institute (HCEI) of the Russian Academy of Sciences, Tomsk, Siberia, Russia, as the NIS Institute involved. Regular scientific research progress meetings were held to which personnel came from all participating partners. The meetings were held mostly at the Phygen facilities in Minneapolis, Minnesota (with Phygen as host) with meetings also held at Tomsk, Russia (HCEI as host), and at Berkeley, California (LBNL as host) In this way, good exposure of all researchers to the various different laboratories involved was attained. This report contains the Final Reports (final deliverables) from the Russian Institute, HCEI. The first part is that for IPP-0110A (the 'main part' of the overall project) and the second part is that for the add-on project IPP-0110A. These reports are detailed, and contain all aspects of all the research carried out. The project was successful in that all deliverables as specified in the proposals were successfully developed, tested, and delivered to Phygen. All of the plasma hardware was designed, made and tested at HCEI, and the performance was excellent. Some of the machine and performance parameters were certainly of 'world class'. The goals and requirements of the IPP Project were well satisfied. I would like to express my gratitude to the DOE IPP program for support of this project throughout its entire duration, and for the unparalleled opportunity thereby provided for all of the diverse participants in the project to join in this collaborative research. The

  16. FinalReport for completed IPP-0110 and 0110A Projects:"High Energy Ion Technology of Interfacial Thin Film Coatings for Electronic, Optical and Industrial Applications"

    Energy Technology Data Exchange (ETDEWEB)

    Brown, Ian

    2009-09-01

    The DOE-supported IPP (Initiatives for Proliferation Prevention) Project, IPP-0110, and its accompanying 'add-on project' IPP-0110A, entitled 'High Energy Ion Technology of Interfacial Thin Film Coatings for Electronic, Optical and Industrial Applications' was a collaborative project involving the Lawrence Berkeley National Laboratory (LBNL) as the U.S. DOE lab; the US surface modification company, Phygen, Inc., as the US private company involved; and the High Current Electronics Institute (HCEI) of the Russian Academy of Sciences, Tomsk, Siberia, Russia, as the NIS Institute involved. Regular scientific research progress meetings were held to which personnel came from all participating partners. The meetings were held mostly at the Phygen facilities in Minneapolis, Minnesota (with Phygen as host) with meetings also held at Tomsk, Russia (HCEI as host), and at Berkeley, California (LBNL as host) In this way, good exposure of all researchers to the various different laboratories involved was attained. This report contains the Final Reports (final deliverables) from the Russian Institute, HCEI. The first part is that for IPP-0110A (the 'main part' of the overall project) and the second part is that for the add-on project IPP-0110A. These reports are detailed, and contain all aspects of all the research carried out. The project was successful in that all deliverables as specified in the proposals were successfully developed, tested, and delivered to Phygen. All of the plasma hardware was designed, made and tested at HCEI, and the performance was excellent. Some of the machine and performance parameters were certainly of 'world class'. The goals and requirements of the IPP Project were well satisfied. I would like to express my gratitude to the DOE IPP program for support of this project throughout its entire duration, and for the unparalleled opportunity thereby provided for all of the diverse participants in the project to join

  17. The Impact of Organization, Project and Governance Variables on Software Quality and Project Success

    OpenAIRE

    Abbas, Noura; Gravell, Andy; Wills, Gary

    2010-01-01

    In this paper we present a statistically tested evidence about how quality and success rate are correlated with variables reflecting the organization and aspects of its project’s governance, namely retrospectives and metrics. The results presented in this paper are based on the Agile Projects Governance Survey that collected 129 responses. This paper discuss the deep analysis of this survey, and the main findings suggest that when applying agile software development, the quality of software i...

  18. 76 FR 12096 - McCloud-Pit Project; Notice of Availability of the Final Environmental Impact Statement for the...

    Science.gov (United States)

    2011-03-04

    ... Project; Notice of Availability of the Final Environmental Impact Statement for the Mccloud-Pit... Pit Rivers in Shasta County, California and has prepared a final environmental impact statement (EIS... and the alternatives for relicensing the McCloud-Pit Project. The final EIS documents the views of...

  19. Assessing IT Projects Success with Extended Fuzzy Cognitive Maps & Neutrosophic Cognitive Maps in comparison to Fuzzy Cognitive Maps

    Directory of Open Access Journals (Sweden)

    Kanika Bhutani

    2016-08-01

    Full Text Available IT projects hold a huge importance to economic growth. Today, half of the capital investments are in IT technology. IT systems and projects are extensive and time consuming; thus implying that its failure is not affordable, so proper feasibility study of assessing project success factors is required. A current methodology like Fuzzy Cognitive Maps has been experimented for identifying and evaluating the success factors in IT projects, but this technique has certain limitations. This paper discusses two new approaches to evaluate IT project success: Extended Fuzzy Cognitive Maps (E-FCM & Neutrosophic Cognitive Maps (NCM.The limitations of FCM like non consideration for non-linear, conditional, time delay weights and indeterminate relations are targeted using E-FCM and NCM in this paper.

  20. Characterization of the radon source in North-Central Florida. Final report part 1 -- Final project report; Final report part 2 -- Technical report

    International Nuclear Information System (INIS)

    1997-01-01

    This report contains two separate parts: Characterization of the Radon Source in North-Central Florida (final report part 1 -- final project report); and Characterization of the Radon Source in North-Central Florida (technical report). The objectives were to characterize the radon 222 source in a region having a demonstrated elevated indoor radon potential and having geology, lithology, and climate that are different from those in other regions of the U.S. where radon is being studied. Radon availability and transport in this region were described. Approaches for predicting the radon potential of lands in this region were developed

  1. IUE project comes to an end after 18+ years of extremely successful orbital operations

    Science.gov (United States)

    1996-08-01

    At a meeting of the Science Programme Committee (SPC) of the European Space Agency (ESA) in February, the decision was taken to terminate the orbital operations of the International Ultraviolet Explorer (IUE) satellite on September 30. Science operations will terminate shortly before that date to allow the necessary end-of-life testing of the spacecraft. Only a year ago, when NASA - the major partner in the IUE project - decided to terminate its IUE science operations, ESA had been able to extend its support to include full responsibility for the scientific operations, under the "hybrid science operations" scheme, and thus maintain this important capability for the astrophysics community. As a consequence of the budgetary restrictions placed on ESA's Science Programme, the earlier recommendation of the Space Science Advisory Committee (SSAC), to terminate the operations of IUE in coordination with NASA in September, was accepted by the SPC. The IUE project, using a 45cm ultraviolet telescope for spectroscopic observations in the waveband 115 to 320 nm, has been carried out jointly by NASA, ESA and the British PPARC (formerly SERC). Launched in 1978, its designed lifetime was only three years. In July, the SPC agreed to complete the IUE Final Archive by the end of 1997, allowing the project to reprocess all its spectroscopic observations (numbering over 100,000) with a newly designed reduction, significantly improving on the normal direct processing done during the operational phase of the IUE project. The resulting homogeneous data archive on the ultraviolet radiation of cosmic sources, collected over the 18+ years of the operational project, will remain an important resource for astrophysical studies for many years to come. This has been one of the most successful astrophysics projects in space science, with more than 3,500 papers in refereed journals based on the observational results of the spectrographs. Over 500 doctoral dissertations have used its results

  2. Impact of Functional Characteristics on Usage of LSS Methods in IT and Perceived Project Success

    Science.gov (United States)

    Mushi, Francis Jeremiah

    2014-01-01

    High rates of Information Technology (IT) project failures continues; fail to meet established deadlines, exceeding budget, or not agreed-upon functionality. Failure often results from a fundamental confusion over what is involved in the project. Methods that have provided project success in Service and Manufacturing industries have not been…

  3. Griffith energy project final environmental impact statement

    International Nuclear Information System (INIS)

    1999-03-01

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fired, combined cycle power plant, on private lands south of Kingman, Arizona. The Project would be a merchant plant which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information

  4. Griffith Energy Project Final Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

  5. Identifying Problems in Students’ Final Projects Based on Scientific Writing Guidelines

    Directory of Open Access Journals (Sweden)

    Endang Ernawati

    2010-11-01

    Full Text Available Article analyzed student’s difficulties and abilities in writing their final projects, which were undergraduate theses and undergraduate paper conducted by some students at the English Department, Bina Nusantara University. This was a preliminary study to support an appropriate student guideline in writing their final project. The study was conducted by applying qualitative methods that was by analyzing the four theses and one paper in terms of their format: titles, introduction, theoretical background, analysis, conclusion, bibliography, and paper rubric to analyze the contents. It can be concluded that generally, students, guided by their mentor/lecturer, understand the final paper guidelines and they are able to apply it in their thesis and paper. But, there are still lack of clarity and relevancy in expressing their ideas properly, and their ability in writing in both English and Bahasa Indonesia must be improved. These problems can be overcome by socializing the writing guidelines to both students and lecturers, providing them with critical thinking skills, cooperation with library that will guide them in information literacy skills, and language center that will improve their writing skills. 

  6. An empirical study on the critical success factors of small to medium sized projects in a South African mining company

    Directory of Open Access Journals (Sweden)

    Du Randt, Francois Jean

    2014-08-01

    Full Text Available Projects that fail, for whatever reason, can impact negatively on society, organisations, and other stakeholders. A number of researchers have identified various critical success factors (CSFs that can influence the outcome and success of a project. This research therefore aims to determine the CSFs that influence various success measures of small- to medium-sized projects at a South African mining company, Exxaro Resources’ Grootegeluk Coal Mine. Other objectives of this research include determining the extent of the impacts of these CSFs on the different success measures of a project. The investigation suggests that there are correlations among CSFs, and that certain factors impact the outcome of projects far more than others. This research finds that the single most important CSF for small- to medium-sized projects is the selection of a competent project manager. The competent project manager is characterised by a group of interrelated CSF factors: good leadership, commitment, and learning from past experiences. Based on the research results, other CSFs are discussed and explored in order for recommendations to be made on how this mining company, and possibly other organisations, can achieve greater project success.

  7. Basalt Waste Isolation Project exploratory shaft site: Final reclamation report

    International Nuclear Information System (INIS)

    Brandt, C.A.; Rickard, W.H. Jr.

    1990-06-01

    The restoration of areas disturbed by activities of the Basalt Waste Isolation Project (BWIP) constitutes a unique operation at the US Department of Energy's (DOE) Hanford Site, both from the standpoint of restoration objectives and the time frame for accomplishing these objectives. The BWIP reclamation program comprises three separate projects: borehole reclamation, Near Surface Test Facility (NSTF) reclamation, and Exploratory Shaft Facility (ESF) reclamation. The main focus of this report is on determining the success of the revegetation effort 1 year after work was completed. This report also provides a brief overview of the ESF reclamation program. 21 refs., 7 figs., 14 tabs

  8. Success factors for international HTA projects: evaluating EUnetHTA Joint Action as an exemplar.

    Science.gov (United States)

    Guegan, Eleanor Woodford; Cook, Andrew

    2014-11-01

    Evaluation is essential for the management of international projects or networks in health technology assessment (HTA). It extends beyond the normal process of project management by incorporating qualitative dimensions and provides information about a project's effectiveness and achievements. This article aimed to identify the factors that are important for the success of international HTA projects. The European network for Health Technology Assessment Joint Action (EUnetHTA JA) is presented as an exemplar. METHODS for the evaluation of international HTA projects include interviews, focus groups, questionnaires, observations and documentary review, and the key points of these approaches have been summarized. The impact and effectiveness of the EUnetHTA JA was evaluated by questionnaires of project participants and external stakeholders, and by documentary review. The response rate for the three annual questionnaires sent to project participants ranged from 86 percent to 88 percent and for external stakeholders ranged from 65 percent to 88 percent. Key factors for project success included production of deliverables according to the workplan, achievement of objectives, added value generated, effective communication, involvement of external stakeholders, workstream management and progress from the preceding EUnetHTA 2006-2008 project. The experience of this project can inform the evaluation of future international HTA collaborations, such as the EUnetHTA 2nd Joint Action and HTAsiaLink. A high response rate was achieved to the self-completion questionnaires and the strategy followed is recommended for evaluation of international HTA projects. Future assessments of international HTA projects should strive to measure outcomes and impact, not just outputs and process.

  9. 76 FR 67178 - Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement...

    Science.gov (United States)

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2149-152] Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells... application for license for the Wells Hydroelectric Project (FERC No. 2149), located on the Columbia River in...

  10. Final report of the inter institutional project ININ-CNSNS 'Source Terms specific for the CNLV'; Informe final del proyecto interinstitucional ININ-CNSNS 'Termino Fuente especifico para la CNLV'

    Energy Technology Data Exchange (ETDEWEB)

    Anaya M, R A [ININ, 52045 Ocoyoacac, Estado de Mexico (Mexico)

    1991-02-15

    The purpose of the project inter institutional ININ-CNSNS 'Source Terms Specifies for the CNLV' it is the one of implanting in the computer CYBER (CDC 180-830) of the ININ, the 'Source Term Code Package' (STCP) and to make the operation tests and corresponding operation using the data of the sample problem, for finally to liberate the package, all time that by means of the analysis of the results it is consider appropriate. In this report the results of the are presented simulation of the sequence 'Energy Losses external' (Station blackout) and 'Lost total of CA with failure of the RCIC and success of the HPCS' both with data of the Laguna Verde Central. (Author)

  11. Staff Helping Attain Relevant Education (Project SHARE): Final Evaluation Report, 1992-93. OREA Report.

    Science.gov (United States)

    Ranadive, Jyoti

    Project SHARE (Staff Helping Attain Relevant Education), a project funded by Title VII of the Elementary and Secondary Education Act, was in its third and final year of operation in 1992-93, in eight primary schools in the Bronx, Brooklyn, and Manhattan (New York). The project served 141 limited English proficient students from low-income families…

  12. District Heating Demonstration project. Bydgoszcz, Poland, Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    The project was finished in January 1999. The present final report outlines the activities of the pilot project. The activities of the project were: Development of a general model or a design strategy for the modernisation of group substations; Training of selected staff in updated design and latest technologies; Comparing experiences from the reconstructed heat exchanger station with alternative solutions; Investigation of potential sources of financing for the modernisation of the district heating system based on a revised feasibility study. The development of a general model for the future design of the heat exchanger station and the substations resulted in a design guideline which was used for the design of the heat exchanger station. KPEC selected the heat exchanger station CC02, located in area B1, as the object for the heat exchanger reconstruction. The station supplies 42 substations in 20 dwelling houses with a total heat demand of 11 MW. The design of the reconstruction began in the autumn of 1996. The equipment was procured during the spring of 1997 and the bulk of the installation work was finished by October 1997. The appointed design engineer participated in two study tours to Denmark. During the implementation the project was enlarged with an addendum. The addendum consisted of a modernisation of twelve building substations. The monitoring programme was enlarged accordingly and the efficiency of the two solutions were compared and evaluated through the monitoring programme. Even though some of the data are rather limited, the monitoring programme reveals a tendency towards the substation modernisation being twice as efficient as the heat exchanger modernisation. The reconstruction of the heat exchanger station has indicated a heat saving potential of 10% whereas the substation project has indicated a heat saving potential of 20%. The project further shows a huge potential for power savings in the main pumps due to the automatic control. (EHS)

  13. The Marketplace Variables in Successful and Unsuccessful NPD Projects in Technology Intensive Companies

    OpenAIRE

    Haverila, Matti

    2010-01-01

    We present an exploratory investigation of how managers conceptualize and perceive ‘marketplace’ variables in successful and unsuccessful New Product Development (NPD) projects, and explore the role that marketplace variables play in differentiating between successful and unsuccessful NPD outcomes. Limitations and future research directions are also discussed. Our findings indicate that managers perceive the marketplace in multiple ways during the NPD process and also that differences exis...

  14. A successful waste stream analysis on a large construction project in a radiologically controlled area

    International Nuclear Information System (INIS)

    Kennicott, M.; Richardson, D.; Starke, T.P.

    1997-01-01

    The Los Alamos National Laboratory (the Laboratory) Chemistry and Metallurgy Research (CMR) Facility, constructed in 1952, is currently under going a major, multi-year demolition and construction project. Many of the operations required under this project (i.e., design, demolition, decontamination, construction, and waste management) mimic the processes required of a large scale decontamination and decommissioning (D and D) job and are identical to the requirements of any of several upgrades projects anticipated for the laboratory and other Department of Energy (DOE) sites. For these reasons the CMR upgrades Project is seen as an ideal model facility--to test the application and measure the success of waste minimization techniques which could be implemented for any similar projects. The purpose of this paper will be to discuss the successful completion of a waste stream analysis. The analyses performed was to measure the potential impact of waste generation, in terms of volume and costs, for a reconfiguration option being considered to change the approach and execution of the original project

  15. 2009 ESMD Space Grant Faculty Project Final Report

    Science.gov (United States)

    Murphy, Gloria; Ghanashyam, Joshi; Guo, Jiang; Conrad, James; Bandyopadhyay, Alak; Cross, William

    2009-01-01

    The Constellation Program is the medium by which we will maintain a presence in low Earth orbit, return to the moon for further exploration and develop procedures for Mars exploration. The foundation for its presence and success is built by the many individuals that have given of their time, talent and even lives to help propel the mission and objectives of NASA. The Exploration Systems Mission Directorate (ESMD) Faculty Fellows Program is a direct contributor to the success of directorate and Constellation Program objectives. It is through programs such as the ESMD Space Grant program that students are inspired and challenged to achieve the technological heights that will propel us to meet the goals and objectives of ESMD and the Constellation Program. It is through ESMD Space Grant programs that future NASA scientists, engineers, and mathematicians begin to dream of taking America to newer heights of space exploration. The ESMD Space Grant program is to be commended for taking the initiative to develop and implement programs that help solidify the mission of NASA. With the concerted efforts of the Kennedy Space Center educational staff, the 2009 ESMD Space Grant Summer Faculty Fellows Program allowed faculty to become more involved with NASA personnel relating to exploration topics for the senior design projects. The 2009 Project was specifically directed towards NASA's Strategic Educational Outcome 1. In-situ placement of Faculty Fellows at the NASA field Centers was essential; this allowed personal interactions with NASA scientists and engineers. In particular, this was critical to better understanding the NASA problems and begin developing a senior design effort to solve the problems. The Faculty Fellows are pleased that the ESMD Space Grant program is taking interest in developing the Senior Design courses at the university level. These courses are needed to help develop the NASA engineers and scientists of the very near future. It has been a pleasure to be

  16. Final project report: High energy rotor development, test and evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    Under the auspices of the {open_quotes}Government/Industry Wind Technology Applications Project{close_quotes} [{open_quotes}Letter of Interest{close_quotes} (LOI) Number RC-1-11101], Flo Wind Corp. has successfully developed, tested, and delivered a high-energy rotor upgrade candidate for their 19-meter Vertical Axis Wind Turbine. The project included the demonstration of the innovative extended height-to-diameter ratio concept, the development of a continuous span single-piece composite blade, the demonstration of a continuous blade manufacturing technique, the utilization of the Sandia National Laboratories developed SNLA 2150 natural laminar flow airfoil and the reuse of existing wind turbine and wind power plant infrastructure.

  17. Ferrocyanide safety project ferrocyanide aging studies. Final report

    International Nuclear Information System (INIS)

    Lilga, M.A.; Hallen, R.T.; Alderson, E.V.

    1996-06-01

    This final report gives the results of the work conducted by Pacific Northwest National Laboratory (PNNL) from FY 1992 to FY 1996 on the Ferrocyanide Aging Studies, part of the Ferrocyanide Safety Project. The Ferrocyanide Safety Project was initiated as a result of concern raised about the safe storage of ferrocyanide waste intermixed with oxidants, such as nitrate and nitrite salts, in Hanford Site single-shell tanks (SSTs). In the laboratory, such mixtures can be made to undergo uncontrolled or explosive reactions by heating dry reagents to over 200 degrees C. In 1987, an Environmental Impact Statement (EIS), published by the U.S. Department of Energy (DOE), Final Environmental Impact Statement, Disposal of Hanford Defense High-Level Transuranic and Tank Waste, Hanford Site, Richland, Washington, included an environmental impact analysis of potential explosions involving ferrocyanide-nitrate mixtures. The EIS postulated that an explosion could occur during mechanical retrieval of saltcake or sludge from a ferrocyanide waste tank, and concluded that this worst-case accident could create enough energy to release radioactive material to the atmosphere through ventilation openings, exposing persons offsite to a short-term radiation dose of approximately 200 mrem. Later, in a separate study (1990), the General Accounting Office postulated a worst-case accident of one to two orders of magnitude greater than that postulated in the DOE EIS. The uncertainties regarding the safety envelope of the Hanford Site ferrocyanide waste tanks led to the declaration of the Ferrocyanide Unreviewed Safety Question (USQ) in October 1990

  18. INVAP and its project management capabilities: a key to company success

    International Nuclear Information System (INIS)

    Salvatore, Marcelo; Delgado, Ricardo; Niklison, Carlos; Ordonez, Juan Pablo; Gerbino, Juan Jose Gil

    2002-01-01

    Over the past 26 years, several factors have contributed to INVAP's projection into domestic and overseas operations. Of these, the most recognized is of course the technological capabilities INVAP keeps developing to satisfy our customer's requirements. In a second thought, the other factor is the strategic objective of providing specific purpose customer oriented solutions. The less obvious third important factor in this trilogy is the successful application of Project Management techniques and methods. INVAP's vision on Project Management encompasses well known concepts as: Integrated Management, Proactive solutions, Cost Control and Reporting, Quality Assurance, Target Schedules, Performance Requirements, Risk Management, Configuration Management and Integrated Logistic Support. After 2 years of execution of the Replacement Research Reactor Project for the Australian Nuclear Science and Technology Organization, our Project Management methodology have allowed us to timely meet all project milestones, complete basic and detail engineering, timely deliver the preliminary safety reports, manufacture and test technological concepts in specifically built mock ups and overcome risky situations -like the economical panorama in Argentina- without jeopardizing our Contractual commitments. Present paper depicts the practical approach INVAP has for Project Management -particularly within the Nuclear Division-, and a description of the tools to such aim developed. (author)

  19. Lessons learned in demonstration projects regarding operational safety during final disposal of vitrified waste and spent fuel

    International Nuclear Information System (INIS)

    Filbert, Wolfgang; Herold, Philipp

    2015-01-01

    The paper summarizes the lessons learned in demonstration projects regarding operational safety during the final disposal of vitrified waste and spent fuel. The three demonstration projects for the direct disposal of vitrified waste and spent fuel are described. The first two demonstration projects concern the shaft transport of heavy payloads of up to 85 t and the emplacement operations in the mine. The third demonstration project concerns the borehole emplacement operation. Finally, open issues for the next steps up to licensing of the emplacement and disposal systems are summarized.

  20. Programmable SAW development :Sandia/NASA project final report.

    Energy Technology Data Exchange (ETDEWEB)

    Brocato, Robert Wesley

    2004-10-01

    This report describes a project to develop both fixed and programmable surface acoustic wave (SAW) correlators for use in a low power space communication network. This work was funded by NASA at Sandia National Laboratories for fiscal years 2004, 2003, and the final part of 2002. The role of Sandia was to develop the SAW correlator component, although additional work pertaining to use of the component in a system and system optimization was also done at Sandia. The potential of SAW correlator-based communication systems, the design and fabrication of SAW correlators, and general system utilization of those correlators are discussed here.

  1. Final Technical Report, Wind Generator Project (Ann Arbor)

    Energy Technology Data Exchange (ETDEWEB)

    Geisler, Nathan [City of Ann Arbor, MI (United States)

    2017-03-20

    A Final Technical Report (57 pages) describing educational exhibits and devices focused on wind energy, and related outreach activities and programs. Project partnership includes the City of Ann Arbor, MI and the Ann Arbor Hands-on Museum, along with additional sub-recipients, and U.S. Department of Energy/Office of Energy Efficiency and Renewable Energy (EERE). Report relays key milestones and sub-tasks as well as numerous graphics and images of five (5) transportable wind energy demonstration devices and five (5) wind energy exhibits designed and constructed between 2014 and 2016 for transport and use by the Ann Arbor Hands-on Museum.

  2. Final report: A Broad Research Project in the Sciences of Complexity; FINAL

    International Nuclear Information System (INIS)

    None

    2000-01-01

    Previous DOE support for ''A Broad Research Program in the Sciences of Complexity'' permitted the Santa Fe Institute to initiate new collaborative research within its Integrative Core activities as well as to host visitors to participate in research on specific topics that serve as motivation and testing-ground for the study of general principles of complex systems. The critical aspect of this support is its effectiveness in seeding new areas of research. Indeed, this Integrative Core has been the birthplace of dozens of projects that later became more specifically focused and then won direct grant support independent of the core grants. But at early stages most of this multidisciplinary research was unable to win grant support as individual projects-both because it did not match well with existing grant program guidelines, and because the amount of handing needed was often too modest to justify a formal proposal to an agency. In fact, one of the attributes of core support has been that it permitted SFI to encourage high-risk activities because the cost was quite low. What is significant is how many of those initial efforts have been productive in the SFI environment. Many of SFI'S current research foci began with a short visit from a researcher new to the SFI community, or as small working groups that brought together carefully selected experts from a variety of fields. As mentioned above, many of the ensuing research projects are now being supported by other funding agencies or private foundations. Some of these successes are described

  3. GENRE ANALYSIS OF THE ENGLISH FINAL PROJECT ABSTRACTS WRITTEN BY THE STUDENTS OF ENGLISH EDUCATION DEPARTMENT OF IKIP PGRI SEMARANG

    Directory of Open Access Journals (Sweden)

    Wiyaka Wiyaka

    2010-12-01

    Full Text Available This study is specifically focused on the student final project abstract based on genre analysis which covers the study of the generic structure and the linguistic features. The statements of the study are: (1. How do the students of English Education Department of IKIP PGRI Semarang realize the generic structure in their final project abstracts (2. How do they realize the linguistic features in their final project abstracts, and (3. What is the contribution of the result of the study to the English Education Program of IKIP PGRI Semarang. The main purpose of this study is to find out the generic structure and linguistic features of the final project abstracts and analyze the contribution of this study to the English Department. This study applies the descriptive qualitative method. The object of this study is the final project abstracts written by English Education Department students of ‘IKIP PGRI Semarang’. The total of 10 final projects formed the data of this study. The data of the study were analyzed using the genre analysis approach. The first step of data analysis was identifying the Moves which was done by using Linguistic evidence and understanding the texts. The finding shows that only some of the final project abstracts made by the students of IKIP PGRI applied the five Moves. It is found that two Moves are applied in all abstracts, they are Purpose and Method Moves (100%. Situating the research is used in five abstracts (50%. Meanwhile the third move that is the Result Move used in eight abstracts (80%. The Conclusion Move found in five abstracts (50%. The result of the analysis showed that two personal pronouns were found in the final project abstracts. Personal pronouns such as ‘the writer’ and ‘the researcher’ were found in all of the abstracts. Personal pronoun ‘she’ was found in one abstract. Finally, there are only five expressions of hedges that are used in the final project abstracts, they

  4. Nuclear emergency preparedness. Final report of the Nordic Nuclear Safety Research Project BOK-1

    DEFF Research Database (Denmark)

    Lauritzen, B.

    2002-01-01

    Final report of the Nordic Nuclear Safety Research project BOK-1. The BOK-1 project, “Nuclear Emergency Preparedness”, was carried out in 1998-2001 with participants from the Nordic and Baltic Sea regions. The project consists of six sub-projects:Laboratory measurements and quality assurance (BOK-1.......1); Mobile measurements and measurement strategies (BOK-1.2); Field measurements and data assimilation (BOK-1.3); Countermeasures in agriculture and forestry (BOK-1.4); Emergency monitoring in theNordic and Baltic Sea countries (BOK-1.5); and Nuclear exercises (BOK-1.6). For each sub-project, the project...

  5. Final design review report for K basin dose reduction project

    International Nuclear Information System (INIS)

    Blackburn, L.D.

    1996-01-01

    The strategy for reducing radiation dose originating from radionuclides absorbed in the K East Basin concrete is to raise the pool water level to provide additional shielding. This report documents a final design review for cleaning/coating basin walls and modifying other basin components where appropriate. The conclusion of this review was that the documents developed constitute an acceptable design for the Dose Reduction Project

  6. Project SUCCESS' Effects on Substance Use-Related Attitudes and Behaviors: A Randomized Controlled Trial in Alternative High Schools

    Science.gov (United States)

    Clark, Heddy Kovach; Ringwalt, Chris L.; Shamblen, Stephen R.; Hanley, Sean M.

    2011-01-01

    Using a randomized controlled effectiveness trial, we examined the effects of Project SUCCESS on a range of secondary outcomes, including the program's mediating variables. Project SUCCESS, which is based both on the Theory of Reasoned Action and on Cognitive Behavior Theory, is a school-based substance use prevention program that targets…

  7. The role of relationships in collaborative partnership success: Lessons from the Alaska Fourth R project.

    Science.gov (United States)

    Crooks, Claire V; Exner-Cortens, Deinera; Siebold, Wendi; Moore, Kami; Grassgreen, Lori; Owen, Patricia; Rausch, Ann; Rosier, Mollie

    2018-04-01

    Collaborative partnerships are critical to achieving health equity. As such, it is important to understand what contributes to the success of such partnerships. This paper describes the Alaska Fourth R collaborative, a multisectoral group of agencies (including education, health and human services, the violence against women sector, the governor's council on domestic violence, and an external evaluator) that successfully planned, implemented and evaluated a multi-focus health education program statewide. The purpose of this paper was to explore the ways in which seven pre-identified factors contributed to the successful achievement of the collaborative's goals. This project was grounded in community-based research principles, and collectively, the group chose to use Roussos and Fawcett's (2000) seven-factor model as the basis for the project. Using this model as a guide, semi-structured interviews were conducted with five leaders from the key organizations in the collaborative. In interviews, stakeholders described how each of the seven factors functioned in the Alaska collaborative to contribute to project success, with a particular focus on the critical role of relationships. Three specific relationship facets emerged as cross-cutting themes: flexibility, transparency, and prioritization. In sum, taking the time to build deep and authentic relationships, and then developing a shared vision and mission within the context of relationships that are flexible, transparent and prioritized, provided a strong foundation for future success in this collaborative. Copyright © 2017 Elsevier Ltd. All rights reserved.

  8. Energy Storage and Distributed Energy Generation Project, Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Schwank, Johannes; Mader, Jerry; Chen, Xiaoyin; Mi, Chris; Linic, Suljo; Sastry, Ann Marie; Stefanopoulou, Anna; Thompson, Levi; Varde, Keshav

    2008-03-31

    This report serves as a Final Report under the “Energy Storage and Distribution Energy Generation Project” carried out by the Transportation Energy Center (TEC) at the University of Michigan (UM). An interdisciplinary research team has been working on fundamental and applied research on: -distributed power generation and microgrids, -power electronics, and -advanced energy storage. The long-term objective of the project was to provide a framework for identifying fundamental research solutions to technology challenges of transmission and distribution, with special emphasis on distributed power generation, energy storage, control methodologies, and power electronics for microgrids, and to develop enabling technologies for novel energy storage and harvesting concepts that can be simulated, tested, and scaled up to provide relief for both underserved and overstressed portions of the Nation’s grid. TEC’s research is closely associated with Sections 5.0 and 6.0 of the DOE "Five-year Program Plan for FY2008 to FY2012 for Electric Transmission and Distribution Programs, August 2006.”

  9. Nuclear emergency preparedness. Final report of the Nordic nuclear safety research project BOK-1

    Energy Technology Data Exchange (ETDEWEB)

    Lauritzen, Bent [Risoe National Lab., Roskilde (Denmark)

    2002-02-01

    Final report of the Nordic Nuclear Safety Research project BOK-1. The BOK-1 project, 'Nuclear Emergency Preparedness', was carried out in 1998-2001 with participants from the Nordic and Baltic Sea regions. The project consists of six sub-projects: Laboratory measurements and quality assurance (BOK-1.1); Mobile measurements and measurement strategies (BOK-1.2); Field measurement and data assimilation (BOK-1.3); Countermeasures in agriculture and forestry (BOK-1.4); Emergency monitoring in the Nordic and Baltic Sea countries (BOK-1.5); and Nuclear exercises (BOK-1.6). For each sub-project, the project outline, objectives and organization are described and main results presented. (au)

  10. Nuclear emergency preparedness. Final report of the Nordic nuclear safety research project BOK-1

    International Nuclear Information System (INIS)

    Lauritzen, Bent

    2002-02-01

    Final report of the Nordic Nuclear Safety Research project BOK-1. The BOK-1 project, 'Nuclear Emergency Preparedness', was carried out in 1998-2001 with participants from the Nordic and Baltic Sea regions. The project consists of six sub-projects: Laboratory measurements and quality assurance (BOK-1.1); Mobile measurements and measurement strategies (BOK-1.2); Field measurement and data assimilation (BOK-1.3); Countermeasures in agriculture and forestry (BOK-1.4); Emergency monitoring in the Nordic and Baltic Sea countries (BOK-1.5); and Nuclear exercises (BOK-1.6). For each sub-project, the project outline, objectives and organization are described and main results presented. (au)

  11. SPEAR 3 Upgrade Project: The Final Year

    International Nuclear Information System (INIS)

    Hettel, R

    2004-01-01

    During April, 2003, the SPEAR 2 storage ring, which served the high energy physics community from 1972 to 1987, and the synchrotron radiation community for an additional 15 years, was removed from its shielding tunnel in order to install the new 3-GeV, 500-mA SPEAR 3 light source. From May to November, SSRL will excavate the tunnel floor and pour a new concrete floor, and then install pre-assembled girders holding magnets, copper vacuum chambers, PEP-II-style rf cavities, and beam line front end components. At the same time, power supply, instrumentation and control, and other ancillary systems will be configured, leading to a commissioning period beginning in November 2003. The progress of accelerator component implementation and installation during the final year of the project will be reviewed

  12. Information System Development: Can Traditional Project Management Tools Be Successful in Post-Industrial Organizations?

    DEFF Research Database (Denmark)

    Carugati, Andrea

    2002-01-01

    Literature on project management of information systems development suggests practices based on success stories in industrial organizations. Recent trends towards post-industrial organizational forms and loosely coupled networked organizations raise questions regarding the applicability of these ...... of information systems development projects in post-industrial organizations. The guidelines are both the result of post-rationalization of the team members and of the case analysis....

  13. Medical waste irradiation study. Final report

    International Nuclear Information System (INIS)

    Adler, R.J.; Stein, J.; Nygard, J.

    1998-01-01

    The North Star Research Corporation Medical Waste project is described in this report, with details of design, construction, operation, and results to date. The project began with preliminary design of the accelerator. The initial design was for a single accelerator chamber with a vacuum tube cavity driver built into the chamber itself, rather than using a commercial tube separate from the RF accelerator. The authors believed that this would provide more adjustability and permit better coupling to be obtained. They did not have sufficient success with that approach, and finally completed the project using a DC accelerator with a unique new scanning system to irradiate the waste

  14. Medical waste irradiation study. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Adler, R.J.; Stein, J. [North Star Research Corp., Albuquerque, NM (United States); Nygard, J. [Advance Bio-Control (United States)

    1998-07-25

    The North Star Research Corporation Medical Waste project is described in this report, with details of design, construction, operation, and results to date. The project began with preliminary design of the accelerator. The initial design was for a single accelerator chamber with a vacuum tube cavity driver built into the chamber itself, rather than using a commercial tube separate from the RF accelerator. The authors believed that this would provide more adjustability and permit better coupling to be obtained. They did not have sufficient success with that approach, and finally completed the project using a DC accelerator with a unique new scanning system to irradiate the waste.

  15. A novel approach to transformed biometrics using successive projections

    Science.gov (United States)

    Gopi, E. S.

    2010-02-01

    Unlike user created password, number of biometrics is limited for creating account in different organizations. Transformed biometrics attempts to solve the problem by transforming the biometric into another form, which is unique to the particular organization. This makes the availability of different transformed biometrics in different organizations transformed from the same biometrics and helps in foolproof transactions. In this article a novel approach to transformed biometrics using successive projection technique is suggested .In the proposed technique, the user can register up to 5*4n-1 organizations if the length of the biometric password is 'n'.

  16. Final project report: TA-35 Los Alamos Power Reactor Experiment No. II (LAPRE II) decommissioning project

    International Nuclear Information System (INIS)

    Montoya, G.M.

    1993-02-01

    This final report addresses the decommissioning of the LAPRE II Reactor, safety enclosure, fuel reservoir tanks, emergency fuel recovery system, primary pump pit, secondary loop, associated piping, and the post-remediation activities. Post-remedial action measurements are also included. The cost of the project including, Phase I assessment and Phase II remediation was approximately $496K. The decommissioning operation produced 533 M 3 of mixed waste

  17. Successful PV SHS project in developing countries? barriers and way foreword

    International Nuclear Information System (INIS)

    Villers, T. de; Watchueng, S.; Shanker, A.; Rambaud-Measson, D.

    2004-01-01

    The implementation of a solar home system (SHS) programme in developing countries is complex and its success is dependant on many factors that are usually difficult to handle. The objective of this paper is to address financial and organisational aspects barriers and measures to PV programme implementation drawn from two specific projects in West Africa. Technical aspects on quality control and monitoring are also discussed. (authors)

  18. Analysis of final year DVM research projects submitted to the Faculty ...

    African Journals Online (AJOL)

    Central Research Laboratory

    in the library. The essence of this study is to guide prospective final year students and researchers in the choice of research topics as this will help in saving their time. It will also ... and Undergraduate projects of the same department in 2002. Obajemu (1999) also .... majority of the rural people. The distribution by animal ...

  19. Final project report

    Energy Technology Data Exchange (ETDEWEB)

    Nitin S. Baliga and Leroy Hood

    2008-11-12

    The proposed overarching goal for this project was the following: Data integration, simulation and visualization will facilitate metabolic and regulatory network prediction, exploration, and formulation of hypotheses. We stated three specific aims to achieve the overarching goal of this project: (1) Integration of multiple levels of information such as mRNA and protein levels, predicted protein-protein interactions/associations and gene function will enable construction of models describing environmental response and dynamic behavior. (2) Flexible tools for network inference will accelerate our understanding of biological systems. (3) Flexible exploration and queries of model hypotheses will provide focus and reveal novel dependencies. The underlying philosophy of these proposed aims is that an iterative cycle of experiments, experimental design, and verification will lead to a comprehensive and predictive model that will shed light on systems level mechanisms involved in responses elicited by living systems upon sensing a change in their environment. In the previous years report we demonstrated considerable progress in development of data standards, regulatory network inference and data visualization and exploration. We are pleased to report that several manuscripts describing these procedures have been published in top international peer reviewed journals including Genome Biology, PNAS, and Cell. The abstracts of these manuscripts are given and they summarize our accomplishments in this project.

  20. Wabash River Coal Gasification Repowering Project: A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of$438 million. Construction for the demonstration project was started in July 1993. Pre-operational tests were initiated in August 1995, and construction was completed in November 1995. Commercial operation began in November 1995, and the demonstration period was completed in December

  1. The Danish Rejsekortet (Smart Card for Public Transportation); Project Governance for Failure or Success?

    DEFF Research Database (Denmark)

    Harboe, Peter Georg; Riis, Eva

    The authors examine a project regarded as a major failure in Danish public investments: The Smart Card for Public Transportation whose introduction was delayed for 9 years with an estimated cost overrun of 125 million EURO. After 3 years of operation, the Smart Card system only covers seven...... of the nine Danish regions and the discussion about giving up the system is continuing. The authors explore the overall conditions set up for these types of projects in the project governance - how project governance conditions a major public IT project and forms the success evaluation. The focus...... is on the whole cycle from project initiation to long-term use of the project results. Data collection is through documentation as governmental reports and evaluations, for example (Rigsrevisionen, 2011; The Comptroller and Auditor General, 2006; Transport Committee, 2011)and semi-structured interviews...

  2. MANAGEMENT OF TRANSURANIC (TRU) WASTE RETRIEVAL PROJECT RISKS SUCCESSES IN THE STARTUP OF THE HANFORD 200 AREA TRU WASTE RETRIEVAL PROJECT

    International Nuclear Information System (INIS)

    GREENWLL, R.D.

    2005-01-01

    A risk identification and mitigation method applied to the Transuranic (TRU) Waste Retrieval Project performed at the Hanford 200 Area burial grounds is described. Retrieval operations are analyzed using process flow diagramming. and the anticipated project contingencies are included in the Authorization Basis and operational plans. Examples of uncertainties assessed include degraded container integrity, bulged drums, unknown containers, and releases to the environment. Identification and mitigation of project risks contributed to the safe retrieval of over 1700 cubic meters of waste without significant work stoppage and below the targeted cost per cubic meter retrieved. This paper will be of interest to managers, project engineers, regulators, and others who are responsible for successful performance of waste retrieval and other projects with high safety and performance risks

  3. Enewetak radiological support project. Final report

    International Nuclear Information System (INIS)

    Friesen, B.

    1982-09-01

    From 1972 through 1980, the Department of Energy acted in an advisory role to the Defense Nuclear Agency during planning for and execution of the cleanup of Enewetak Atoll. The Nevada Operations Office of the Department of Energy was responsible for the radiological characterization of the atoll and for certification of radiological condition of each island upon completion of the project. In-situ measurements of gamma rays emitted by americium-241 were utilized along with wet chemistry separation of plutonium from soil samples to identify and delineate surface areas requiring removal of soil. Military forces removed over 100,000 cubic yards of soil from the surface of five islands and deposited this material in a crater remaining from the nuclear testing period. Subsurface soil was excavated and removed from several locations where measurements indicated the presence of radionuclides above predetermined criteria. The methodologies of data acquisition, analysis and interpretation are described and detailed results are provided in text, figures and microfiche. The final radiological condition of each of 43 islets is reported

  4. Final disposal of radioactive wastes in Switzerland: concept and overview of Project Guarantee 1985

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    The validity of the operational licences of the existing Swiss nuclear power plants (NPP) Beznau I and II, Muehleberg, Goesgen and Leibstadt after 31st. December 1985 is, because of official requirements, dependent on the demonstration of permanent, safe management and final disposal of radioactive waste. For this purpose, the NPP companies have to prepare a so-called guarantee project and present this to the Bundesrat for review. The appropriate investigations and research have been carried out by Nagra (National Cooperative for the Storage of Radioactive Waste). The 1985 Project Gewaehr (Guarantee) is described in an eight volume report NGB 85-01 to 85-08 and individual research projects are reported on in separate NTB-series reference reports. The present volume NGB 85-01 takes the form of a self-contained project overview in which the concepts for nuclear waste management are described, the contents of the remaining volumes NGB 85-02 to 85-08 are summarized and Project conclusions are drawn from Project Gewaehr 1985. Project Gewaehr 1985 covers two repository types: Type C repository for high-level and certain alpha-containing intermediate-level waste, and Type B repository for all remaining intermediate- and low-level waste. The Project shows in detail that technical feasibility of final disposal can be assumed given presently available methods, that the technical safety barriers show a high level of efficiency and that suitable geological options are available to ensure long-term safety in Switzerland as the concept is defined by official requirements. The Project safety analyses show that the chosen disposal concepts assure the protection of mankind and the environment under all realistically anticipated conditions

  5. Final Technical Report - Kotzebue Wind Power Project - Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker

    2007-10-31

    The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

  6. Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Small, R. Justin [Woods Hole Oceanographic Institution, MA (United States); Bryan, Frank [Woods Hole Oceanographic Institution, MA (United States); Tribbia, Joseph [Woods Hole Oceanographic Institution, MA (United States); Park, Sungsu [Woods Hole Oceanographic Institution, MA (United States); Dennis, John [Woods Hole Oceanographic Institution, MA (United States); Saravanan, R. [Woods Hole Oceanographic Institution, MA (United States); Schneider, Niklas [Woods Hole Oceanographic Institution, MA (United States); Kwon, Young-Oh [Woods Hole Oceanographic Institution, MA (United States)

    2015-06-01

    Most climate models are currently run with grid spacings of around 100km, which, with today’s computing power, allows for long (up to 1000 year) simulations, or ensembles of simulations to explore climate change and variability. However this grid spacing does not resolve important components of the weather/climate system such as atmospheric fronts and mesoscale systems, and ocean boundary currents and eddies. The overall aim of this project has been to look at the effect of these small-scale features on the weather/climate system using a suite of high and low resolution climate models, idealized models and observations. This project was only possible due to the highly scalable aspect of the CAM Spectral Element dynamical core, and the significant resources allocated at Yellowstone and NERSC for which we are grateful.

  7. Blue Creek Winter Range: Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1994-11-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Agreement pertaining to the Blue Creek Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Spokane Tribe, Upper Columbia United Tribes, and the Bureau of Indian Affairs (BIA). If fully implemented, the proposed action would allow the sponsors to protect and enhance 2,631 habitat units of big game winter range and riparian shrub habitat on 2,185 hectares (5,400 acres) of Spokane Tribal trust lands, and to conduct long term wildlife management activities within the Spokane Indian Reservation project area. This Final Environmental Assessment (EA) examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir

  8. Decision models in explorative and exploitative innovation projects: a case study

    NARCIS (Netherlands)

    Wolbers, Michiel; Hofman, Erwin; Halman, Johannes I.M.

    2013-01-01

    Innovation processes are seen as collections of decisions that are made in the context of a single innovation project. Those decisions determine the course and the final success of an innovation project. There is, however, a lack of literature on how decisions are made in innovation projects. In

  9. Theoretical Approach Regarding the Bases of Success and Reasons that May Lead to Failure in Project Management

    OpenAIRE

    Larisa Loredana Dragolea; Denisa Cotîrlea Denisa

    2012-01-01

    The present paper work deals with theoretical concepts regarding the reasons that may lead to a project’s failure or success. The primary aim of the work paper is to help readers to get a view of conceptualizations of project management and its phases, while providing an opportunity to see the interferences of factors that may determine project’s success. This work paper also contains some aspects regarding key-factors and elements that may assure a good management of projects. The present su...

  10. Public project success as seen in a broad perspective.: Lessons from a meta-evaluation of 20 infrastructure projects in Norway.

    Science.gov (United States)

    Volden, Gro Holst

    2018-08-01

    Infrastructure projects in developed countries are rarely evaluated ex-post. Despite their number and scope, our knowledge about their various impacts is surprisingly limited. The paper argues that such projects must be assessed in a broad perspective that includes both operational, tactical and strategic aspects, and unintended as well as intended effects. A generic six-criteria evaluation framework is suggested, inspired by a framework frequently used to evaluate development assistance projects. It is tested on 20 Norwegian projects from various sectors (transport, defence, ICT, buildings). The results indicate that the majority of projects were successful, especially in operational terms, possibly because they underwent external quality assurance up-front. It is argued that applying this type of standardized framework provides a good basis for comparison and learning across sectors. It is suggested that evaluations should be conducted with the aim of promoting accountability, building knowledge about infrastructure projects, and continuously improve the tools, methods and governance arrangements used in the front-end of project development. Copyright © 2018 The Author. Published by Elsevier Ltd.. All rights reserved.

  11. Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Saurwein, John

    2011-07-15

    This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

  12. Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

    International Nuclear Information System (INIS)

    Saurwein, J.

    2011-01-01

    This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

  13. Missouri Soybean Association Biodiesel Demonstration Project: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Ludwig, Dale [Missouri Soybean Association, Jefferson City, MO (United States); Hamilton, Jill [Sustainable Energy Strategies, Inc., Fairfax, VA (United States)

    2011-10-27

    The Missouri Soybean Association (MSA) and the National Biodiesel Board (NBB) partnered together to implement the MSA Biodiesel Demonstration project under a United States Department of Energy (DOE) grant. The goal of this project was to provide decision makers and fleet managers with information that could lead to the increased use of domestically produced renewable fuels and could reduce the harmful impacts of school bus diesel exhaust on children. This project was initiated in September 2004 and completed in April 2011. The project carried out a broad range of activities organized under four areas: 1. Petroleum and related industry education program for fuel suppliers; 2. Fleet evaluation program using B20 with a Missouri school district; 3. Outreach and awareness campaign for school district fleet managers; and 4. Support of ongoing B20 Fleet Evaluation Team (FET) data collection efforts with existing school districts. Technical support to the biodiesel industry was also provided through NBB’s Troubleshooting Hotline. The hotline program was established in 2008 to troubleshoot fuel quality issues and help facilitate smooth implementation of the RFS and is described in greater detail under Milestone A.1 - Promote Instruction and Guidance on Best Practices. As a result of this project’s efforts, MSA and NBB were able to successfully reach out to and support a broad spectrum of biodiesel users in Missouri and New England. The MSA Biodiesel Demonstration was funded through a FY2004 Renewable Energy Resources Congressional earmark. The initial focus of this project was to test and evaluate biodiesel blends coupled with diesel oxidation catalysts as an emissions reduction technology for school bus fleets in the United States. The project was designed to verify emissions reductions using Environmental Protection Agency (EPA) protocols, then document – with school bus fleet experience – the viability of utilizing B20 blends. The fleet experience was expected to

  14. WSF Biodiesel Demonstration Project Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Washington State University; University of Idaho; The Glosten Associates, Inc.; Imperium Renewables, Inc.

    2009-04-30

    engines. Each test vessel did experience a microbial growth bloom that produced a build up of material in the fuel purifiers similar to material witnessed in the 2004 fuel test. A biocide was added with each fuel shipment and the problem subsided. In January of 2009, the WSF successfully completed an eleven month biodiesel fuel test using approximately 1,395,000 gallons of biodiesel blended fuels. The project demonstrated that biodiesel can be used successfully in marine vessels and that current ASTM specifications are satisfactory for marine vessels. Microbial growth in biodiesel diesel interface should be monitored. An inspection of the engines showed no signs of being negatively impacted by the test.

  15. Final report on Paradox Basin/Gulf Interior: Regulatory project management

    International Nuclear Information System (INIS)

    1986-12-01

    This final report on the Regulatory Project Manager (RPM) program begins with a discussion of the key products produced during the 9-year effort and then focuses on the work performed in the major disciplines. The report then discusses the management of the work effort and the Quality Assurance (QA) program. It concludes with a brief discussion of the records turned over to the Office of Nuclear Waste Isolation (ONWI) at the conclusion of the work. 14 figs., 14 tabs

  16. The impact of project marketing on the projects finality

    Directory of Open Access Journals (Sweden)

    Oxana SAVCIUC

    2015-06-01

    Full Text Available In the last years we assist at the level of the Republic of Moldova and also at international level at a trend to offer financial support with a special focus on project-based funding. Once with the appearance and development of the project concept, other related concepts are being developed such as project management or newly, we can also speak about the projects marketing. Until recently, the product marketing was intensely discussed; concepts such as services marketing appeared afterwards, but also the specific marketing for various branches, such as agromarketing, political marketing, etc. Given that fact that the projects are a product / service itself, at the moment, more and more often projects marketing is discussed.

  17. Project management. A discipline which contributes to project success

    International Nuclear Information System (INIS)

    Hoch, G.

    2008-01-01

    The presentation covers the following topics: description of the Project - a contract was signed between KNPP and European Consortium Kozloduy (ECK) consisting of Framatome ANP GmbH as Leader (63%), Framatome ANP S.A.S. (17%), Atomenergoexport (20%) ; Project management in the modernization of NPP Kozloduy units 5 and 6; Project management process within AREVA NP GmbH; current status

  18. Key Success Factors of Renewable Energy Projects Implementation in Rural Areas of Indonesia

    Directory of Open Access Journals (Sweden)

    Wati Hermawati

    2017-12-01

    Full Text Available This paper is an exploratory study on renewable energy implementation in the rural areas of Indonesia. The study aim was to investigate the factors contributing to the sustainability of renewable energy projects in the rural areas. It mostly uses a qualitative approach. Primary data was mainly obtained from in-depth interviews conducted in site areas with the project owners, project managers, a key person in each local government, industry representatives, and the local community, including local leaders and users of renewable energy. Secondary data in the form of various official project reports was also used. The results indicated that the success of energy project implementation lay not only in good technology performance and long-term maintenance, but was also highly dependent on six key factors, namely: (1 project planning and development; (2 community participation; (3 active communication and beneficiaries; (4 availability of maintenance program, workshop and technician; (5 project management and institutionalization; (6 local government support and networks. The findings from this study provide useful insights to all stakeholders involved in the implementation of renewable energy technology for the rural areas in Indonesia.

  19. Final project report, TA-35 Los Alamos Power Reactor Experiment No. II (LAPRE II) decommissioning project

    International Nuclear Information System (INIS)

    Montoya, G.M.

    1992-01-01

    This final report addresses the decommissioning of the LAPRE II Reactor, safety enclosure, fuel reservoir tanks, emergency fuel recovery system, primary pump pit, secondary loop, associated piping, and the post-remediation activities. Post-remedial action measurements are also included. The cost of the project, including Phase I assessment and Phase II remediation was approximately $496K. The decommissioning operation produced 533 m 3 of low-level solid radioactive waste and 5 m 3 of mixed waste

  20. Description of the supporting factors of final project in Mathematics and Natural Sciences Faculty of Syiah Kuala University with multiple correspondence analysis

    Science.gov (United States)

    Rusyana, Asep; Nurhasanah; Maulizasari

    2018-05-01

    Syiah Kuala University (Unsyiah) is hoped to have graduates who are qualified for working or creating a field of work. A final project course implementation process must be effective. This research uses data from the evaluation conducted by Mathematics and Natural Sciences Faculty (FMIPA) of Unsyiah. Some of the factors that support the completion of the final project are duration, guidance, the final project seminars, facility, public impact, and quality. This research aims to know the factors that have a relationship with the completion of the final project and identify similarities among variables. The factors that support the completion of the final project at every study program in FMIPA are (1) duration, (2) guidance and (3) facilities. These factors are examined for the correlations by chi-square test. After that, the variables are analyzed with multiple correspondence analysis. Based on the plot of correspondence, the activities of the guidance and facilities in Informatics Study Program are included in the fair category, while the guidance and facilities in the Chemistry are included in the best category. Besides that, students in Physics can finish the final project with the fastest completion duration, while students in Pharmacy finish for the longest time.

  1. Project quality management critical success factors for buildings

    CERN Document Server

    Low, Sui Pheng

    2014-01-01

    The book presents the development of the Construction Quality Assessment System (CONQUAS), Singapore’s de facto quality performance measurement system, explains the application of the Quality Management System (QMS) to manage CONQUAS and identifies 33 critical success factors (CSFs) for achieving high CONQUAS scores. Through CONQUAS, the reader benefits from understanding how the Singapore government developed and implemented the first objective system for measuring what many building professionals have perceived to be elusive quality standards in the construction industry. The book presents both the theoretical concepts as well as the practical aspects to achieving strategic Project Quality Management that is anchored on the CSFs to building best practices. To realistically reflect the practical aspects and challenging issues faced by stakeholders in the construction industry, questionnaire surveys were conducted with building professionals to distinguish the importance level and extent of adoption of the ...

  2. Global Radiological Source Sorting, Tracking, and Monitoring Project: Phase I Final Report

    International Nuclear Information System (INIS)

    Walker, Randy M.; Hill, David E.; Gorman, Bryan L.

    2010-01-01

    As a proof of concept tested in an operational context, the Global Radiological Source Sorting, Tracking, and Monitoring (GRadSSTraM) Project successfully demonstrated that radio frequency identification (RFID) and Web 2.0* technologies can be deployed to track controlled shipments between the United States and the European Union. Between November 2009 and May 2010, a total of 19 shipments were successfully shipped from Oak Ridge National Laboratory (ORNL) by the U.S. Postal Service (USPS) and tracked to their delivery at England's National Physical Laboratory (NPL) by the United Kingdom Royal Mail. However, the project can only be viewed as a qualified success as notable shortcomings were observed. Although the origin and terminus of all RFID-enabled shipments were recorded and no shipments were lost, not all the waypoints between ORNL and NPL were incorporated into the pilot. Given limited resources, the project team was able to install RFID listeners/actuators at three waypoints between the two endpoints. Although it is likely that all shipments followed the same route between ORNL and NPL, it cannot be determined beyond question that all 19 shipments were routed on identical itineraries past the same three waypoints. The pilot also raises the distinct possibility that unattended RFID tracking alone, without positive confirmation that a tagged item has been properly recorded by an RFID reader, does not meet a rigorous standard for shipping controlled items. Indeed, the proof of concept test strongly suggests that a multifaceted approach to tracking may be called for, including tracking methods that are capable of reading and accepting multiple inputs for individual items (e.g., carrier-provided tracking numbers, Universal Product Codes (UPCs), and RFID tags). For controlled items, another apparent requirement is a confirmation feature, human or otherwise, which can certify that an item's RFID tag, UPC, or tracking number has been recorded.

  3. 'Advancement of KHPS to DOE TRL 7/8' Project - Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Adonizio, Mary Ann [Verdant Power Inc., New York, NY (United States); Corren, Dean [Verdant Power Inc., New York, NY (United States); Smith, Ron [Verdant Power Inc., New York, NY (United States); Colby, Jonathan [Verdant Power Inc., New York, NY (United States); Hernandez, Aaron [Verdant Power Inc., New York, NY (United States)

    2016-04-08

    Final Report describing activities performed under the 'Advancement of the KHPS to DOE TRL 7/8' project, including the development of critical component test protocols, testing and analysis of the Gen5 KHPS main shaft seal, and continuing compliance work on approved operational environmental monitoring plans in anticipation of KHPS turbine installation at Verdant Power's Roosevelt Island Tidal Energy (RITE) Project site in New York, NY.

  4. Fernald closure project - Lessons learned in the execution of this successful project, completed October 2006

    International Nuclear Information System (INIS)

    Murphy, Cornelius; Reising, Johnny

    2007-01-01

    Available in abstract form only. Full text of publication follows: This paper explores the history and lessons learned on the United States' Department of Energy's (DoE's) Fernald Closure Project - from the completion of the uranium-production mission to the implementation of the Records of Decision defining the cleanup standards and the remedies that were achieved. Cleaning up Fernald and returning it to the people of Ohio was a $4.4 billion dollar mega environmental-remediation project that was completed in October 2006. During a period of nearly 37 years, Fernald produced 250,000 tons of high-purity, low-enriched uranium for the U.S. defense program, generating more than six million tons of liquid and solid waste as it carried out its Cold War mission. The facility was shut down in 1989 and clean up began in 1992, when Fluor won the contract to clean up the site. The project comprised four phases: 1. Determining the extent of damage to the environment and groundwater at, and adjacent to, the production facilities 2. Selecting cleanup criteria - final end states that had to be met to protect human health and the environment 3. Selecting and implementing the remedial actions that would meet the cleanup goals 4. Doing the work safely, compliantly and cost-effectively. In the project's early stages, there were strained relationships and total distrust between the local community and the DOE as a result of aquifer contamination and potential health effects to the workers and local residents. (authors)

  5. Final Report for NIREC Renewable Energy Research & Development Project

    Energy Technology Data Exchange (ETDEWEB)

    Borland, Walt [Nevada Institute for Renewable Energy Commercialization (NIREC), Las Vegas, NV (United States)

    2017-05-02

    This report is a compilation of progress reports and presentations submitted by NIREC to the DOE’s Solar Energy Technologies Office for award number DE-FG36-08GO88161. This compilation has been uploaded to OSTI by DOE as a substitute for the required Final Technical Report, which was not submitted to DOE by NIREC or received by DOE. Project Objective: The primary goal of NIREC is to advance the transformation of the scientific innovation of the institutional partner’s research in renewable energy into a proof of the scientific concept eventually leading to viable businesses with cost effective solutions to accelerate the widespread adoption of renewable energy. NIREC will a) select research projects that are determined to have significant commercialization potential as a result of vetting by the Technology and commercialization Advisory Board, b) assign an experienced Entrepreneur-in-Residence (EIR) to each manage the scientific commercialization-preparedness process, and c) facilitate connectivity with venture capital and other private-sector capital sources to fund the rollout, scaling and growth of the resultant renewable energy business.

  6. Northeast Oregon Hatchery Project, Conceptual Design Report, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Watson, Montgomery (Montgomery Watson, Bellevue, WA)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  7. Northeast Oregon Hatchery Project conceptual design report. Final report

    International Nuclear Information System (INIS)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed

  8. EXTENDED CRITICAL SUCCESS FACTOR MODEL FOR MANAGEMENT OF MULTIPLE PROJECTS: AN EMPIRICAL VIEW FROM TRANSNET IN SOUTH AFRICA

    Directory of Open Access Journals (Sweden)

    J.M. Nethathe

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: Transnet Freight Rail in South Africa has faced projects delays in its multi-project environment. This study takes South Africa as representative of developing countries, and develops the Critical Success Factors (CSFs model for multiple projects success, with the goal of expanding the conventional model by adding the demographic characteristics of the business units involved in the multiple projects. The empirical results showing the greatest number of success factors are people-related, with the focus on team selection and team commitment. Two demographic characteristics are of importance when managing multiple projects: the size of the business unit, and the employees’ project experience.

    AFRIKAANSE OPSOMMING: Transnet, ‘n spoorvragentiteit in Suid-Afrika, ondervind gereeld projekvertragings in hul multi-projekomgewing. Suid-Afrika, as ‘n voorbeeld van ontwikkelende lande, word in die studie gebruik en hierdie studie ontwikkel ‘n reeks suksesfaktore vir ‘n multi-projek-omgewing deur ‘n bestaande konvensionele model aan te pas om ook die demografiese eienskappe van die verskillende besigheidseenhede betrokke in die organisasie te inkorpo-reer. Die resultaat van die studie wys dat die grootste aantal suksesfaktore mens-geörienteerd is, met die fokus op die samestelling en toewyding van die betrokke projekspanne. Twee demografiese eienskape is belangrik by die bestuur van multi-projekte, naamlik die grootte van die besigheidseenheid asook projekondervinding van die werknemers.

  9. Impact of Role Clarity and Strategic Fit on Average Project Success: Moderating Role of Market Turbulence on Telecom Companies of Pakistan

    Directory of Open Access Journals (Sweden)

    Najam UL MABOOD

    2017-06-01

    Full Text Available Advancement in technology has reshaped the businesses across the globe forcing companies to perform tasks and activities in the form of projects. Stakeholder behavior, stakeholder management, strategic fit, role and task clarity are some of the factors that redesign the project success. The current study examine the impact of strategic fit and role clarity on the Average project success and further it enlightens the moderating role of Market turbulence on the relationship between the aforementioned independent and dependent variables. The population of the study comprises of telecom sector of Pakistan. The Data was collected from 201 project team members working on diverse project in Telecom companies of Rawalpindi and Islamabad. The Data was gathered through a questionnaires measured on Likert scale adopted from the study of Beringer, Jonas & Kock (2013. Each Questionnaire comprises of 3 items to measure each variable. SPSS 20.0 Version was used to analyze the data by applying Pearson correlation and multiple regression analysis technique. Findings depicted that role clarity and strategic fit contributed significantly in enhancing success of a project. Results further evidenced that market turbulence negatively moderated the relationship of independent variables on Average project success. The study at the end highlights recommendations for the future researchers.

  10. Terahertz spectral signatures :measurement and detection LDRD project 86361 final report.

    Energy Technology Data Exchange (ETDEWEB)

    Wanke, Michael Clement; Brener, Igal; Lee, Mark

    2005-11-01

    LDRD Project 86361 provided support to upgrade the chemical and material spectral signature measurement and detection capabilities of Sandia National Laboratories using the terahertz (THz) portion of the electromagnetic spectrum, which includes frequencies between 0.1 to 10 THz. Under this project, a THz time-domain spectrometer was completed. This instrument measures sample absorption spectra coherently, obtaining both magnitude and phase of the absorption signal, and has shown an operating signal-to-noise ratio of 10{sub 4}. Additionally, various gas cells and a reflectometer were added to an existing high-resolution THz Fourier transform spectrometer, which greatly extend the functionality of this spectrometer. Finally, preliminary efforts to design an integrated THz transceiver based on a quantum cascade laser were begun.

  11. Final Project Report

    DEFF Research Database (Denmark)

    Duer, Karsten

    1997-01-01

    The report summarizes the work that has been carried out within the project "B1 AEROGELS" as a part of the IEA SH&CP Task 18 "Advanced Glazing and Associated Materials For SolarAnd Building Applications". By providing at the same time thermal insulation and transparency the silica aerogel is a very...

  12. Final environmental impact statement Kenetech/PacifiCorp Windpower Project Carbon County, Wyoming

    International Nuclear Information System (INIS)

    1995-08-01

    The Draft and Final Environmental Impact Statements (DEIS and FEIS) assess the environmental consequences of a proposed windpower energy development in Carbon County, Wyoming. This abbreviated FEIS revises and supplements the DEIS for the project and addresses comments expressed for the DEIS. The proposed project entails the erection of approximately 1,390 wind turbine generators and associated facilities (e.g., roads, substations, distribution and communications lines) by KENETECH Windpower, Inc. A 230-kV transmission line would be built by PacifiCorp, Inc. to connect a proposed substation on Foote Creek Rim near Arlington to the Miner's substation near Hanna. The proposed project would use standard procedures as currently employed by other right-of-way projects, plus additional project-specific and site-specific mitigation measures to ensure that project impacts are minimized on all important resources. Impacts to most resources would be negligible to moderate during the life-of-project. Potentially significant impacts from the project include avian mortality; declining avian populations; threatened, endangered, candidate, and/or state sensitive species mortality and/or habitat loss; disturbance to nearby residents due to noise; changes in visual resources; disturbance of important Native American traditional sites; changes in plant community species composition due to snow redistribution; displacement of big game due to windfarm operation; and loss of sage grouse nesting habitat. The proposed project could also have numerous beneficial impacts including increased revenues generated by taxes, increased employment, and benefits derived from using a nonpolluting resource for electric power generation

  13. Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Schuur, Edward [Northern Arizona Univ., Flagstaff, AZ (United States); Luo, Yiqi [Univ. of Oklahoma, Norman, OK (United States)

    2016-12-01

    This final grant report is a continuation of the final grant report submitted for DE-SC0006982 as the Principle Investigator (Schuur) relocated from the University of Florida to Northern Arizona University. This report summarizes the original project goals, as well as includes new project activities that were completed in the final period of the project.

  14. Phase II Final Project Report SBIR Project: "A High Efficiency PV to Hydrogen Energy System"

    Energy Technology Data Exchange (ETDEWEB)

    Slade, A; Turner, J; Stone, K; McConnell, R

    2008-09-02

    The innovative research conducted for this project contributed greatly to the understanding of generating low-cost hydrogen from solar energy. The project’s research identified two highly leveraging and complementary pathways. The first pathway is to dramatically increase the efficiency of converting sunlight into electricity. Improving solar electric conversion efficiency directly increases hydrogen production. This project produced a world record efficiency for silicon solar cells and contributed to another world record efficiency for a solar concentrator module using multijunction solar cells. The project’s literature review identified a second pathway in which wasted heat from the solar concentration process augments the electrolysis process generating hydrogen. One way to do this is to use a “heat mirror” that reflects the heat-producing infrared and transmits the visible spectrum to the solar cells; this also increases solar cell conversion efficiency. An economic analysis of this concept confirms that, if long-term concentrator photovoltaic (CPV) and solid-oxide electrolyzer cost goals can be achieved, hydrogen will be produced from solar energy cheaper than the cost of gasoline. The potential public benefits from this project are significant. The project has identified a potential energy source for the nation’s future electricity and transportation needs that is entirely “home grown” and carbon free. As CPV enter the nation’s utility markets, the opportunity for this approach to be successful is greatly increased. Amonix strongly recommends further exploration of this project’s findings.

  15. Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

  16. Resource contingency program - Oregon. Final environmental impact statement, Hermiston power project

    International Nuclear Information System (INIS)

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA's Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA's intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future

  17. Does risk management contribute to IT project success? A meta-analysis of empirical evidence

    NARCIS (Netherlands)

    de Bakker, K.F.C.; Boonstra, A.; Wortmann, J.C.

    The question whether risk management contributes to IT project success is considered relevant by people from both academic and practitioners' communities already for a long time. This paper presents a meta-analysis of the empirical evidence that either supports or opposes the claim that risk

  18. Final report of the inter institutional project ININ-CNSNS 'Source Terms specific for the CNLV'; Informe final del proyecto interinstitucional ININ-CNSNS 'Termino Fuente especifico para la CNLV'

    Energy Technology Data Exchange (ETDEWEB)

    Anaya M, R.A. [ININ, 52045 Ocoyoacac, Estado de Mexico (Mexico)

    1991-02-15

    The purpose of the project inter institutional ININ-CNSNS 'Source Terms Specifies for the CNLV' it is the one of implanting in the computer CYBER (CDC 180-830) of the ININ, the 'Source Term Code Package' (STCP) and to make the operation tests and corresponding operation using the data of the sample problem, for finally to liberate the package, all time that by means of the analysis of the results it is consider appropriate. In this report the results of the are presented simulation of the sequence 'Energy Losses external' (Station blackout) and 'Lost total of CA with failure of the RCIC and success of the HPCS' both with data of the Laguna Verde Central. (Author)

  19. Probability-of-success studies for geothermal projects: from subsurface data to geological risk analysis

    Science.gov (United States)

    Schumacher, Sandra; Pierau, Roberto; Wirth, Wolfgang

    2017-04-01

    In recent years, the development of geothermal plants in Germany has increased significantly due to a favorable political setting and resulting financial incentives. However, most projects are developed by local communities or private investors, which cannot afford a project to fail. To cover the risk of total loss if the geothermal well should not provide the energy output necessary for an economically viable project, investors try to procure insurances for this worst case scenario. In order to issue such insurances, the insurance companies insist on so called probability-of-success studies (POS studies), in which the geological risk for not achieving the necessary temperatures and/or flow rates for an economically successful project is quantified. Quantifying the probability of reaching a minimum temperature, which has to be defined by the project investors, is relatively straight forward as subsurface temperatures in Germany are comparatively well known due tens of thousands of hydrocarbon wells. Moreover, for the German Molasse Basin a method to characterize the hydraulic potential of a site based on pump test analysis has been developed and refined in recent years. However, to quantify the probability of reaching a given flow rate with a given drawdown is much more challenging in areas where pump test data are generally not available (e.g. the North German Basin). Therefore, a new method based on log and core derived porosity and permeability data was developed to quantify the geological risk of reaching a determined flow rate in such areas. We present both methods for POS studies and show how subsurface data such as pump tests or log and core measurements can be used to predict the chances of a potential geothermal project from a geological point of view.

  20. Distributed Project Work

    DEFF Research Database (Denmark)

    Borch, Ole; Kirkegaard, B.; Knudsen, Morten

    1998-01-01

    for information exchange in the traditional project environment is performed. A group of teachers and a student group using small project examples test the method. The first test group used a prototype for testing and found the new activity synchronization difficult to adapt, so the method was finally adjusted...... to be very precises and with success used on the second test group. Distributed project work is coming pretty soon and with little improvement in server tools, projects in different topics with a large and inhomogeneous profile of users are realistic.......Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work...

  1. Successful Rural Water Supply Projects and the Concerns of Women. Women in Development.

    Science.gov (United States)

    Roark, Paula

    As the traditional water carriers and water managers, third world women are crucial to the success of rural water supply projects whose short term goal is increased water quality and quantity and whose long term goal is improved family health. Change depends on the utilization of local learning systems of the society and women are most often the…

  2. Critical success factors influencing project success in the ...

    African Journals Online (AJOL)

    team members experience job satisfaction and are, therefore, motivated to be ... who are principal agents that were the interface between the client and the contractor. .... define roles and responsibilities of project team members. According.

  3. DE-NE0000735 - FINAL REPORT ON THORIUM FUEL CYCLE NEUP PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Krahn, Steven [Vanderbilt Univ., Nashville, TN (United States); Ault, Timothy [Vanderbilt Univ., Nashville, TN (United States); Worrall, Andrew [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-09-30

    The report is broken into six chapters, including this executive summary chapter. Following an introduction, this report discusses each of the project’s three major components (Fuel Cycle Data Package (FCDP) Development, Thorium Fuel Cycle Literature Analysis and Database Development, and the Thorium Fuel Cycle Technical Track and Proceedings). A final chapter is devoted to summarization. Various outcomes, publications, etc. originating from this project can be found in the Appendices at the end of the document.

  4. The Marketplace Variables in Successful and Unsuccessful NPD Projects in Technology Intensive Companies

    Directory of Open Access Journals (Sweden)

    Matti J. Haverila

    2010-12-01

    Our findings indicate that managers perceive the marketplace in multiple ways during the NPD process and also that differences exist in metric equivalence across successful and unsuccessful NPD projects. Also, although half of the marketplace variables are positively related to NPD success, managers in Finnish technology companies appear to attach higher relative importance to market attractiveness rather than market competitiveness variables. Marketplace variables appear to be less important than in the Korean and Chinese samples, and much more important than  in the Canadian sample in the Mishra et all study (1996, and similarly much more important than in the Cooper study (1979b.

  5. ISS-NIH Collaborative Programme: final report of the projects

    International Nuclear Information System (INIS)

    2009-01-01

    In July 2003, the National Institutes of Health (NIH) of the United States of America and the Istituto Superiore di Sanita (ISS) of Italy signed an agreement aimed at strengthening the ongoing research cooperation between USA and Italy. Over the years, the programme was able to create new partnerships and to foster the establishment of innovative synergies, the exchange of young researcher, and the merging of the best available skills, talents and know-how in different fields of biomedical sciences. This book contains the final report of the projects of the scientific cooperation between the two Countries. The report consists of two parts (in Italian and English) divided into four sections: Cancer, Neuroscience, Cardiovascular diseases, Infectious diseases [it

  6. Pilot project Uljabuouda. Final report; Pilotprojekt Uljabuouda. Slutrapport

    Energy Technology Data Exchange (ETDEWEB)

    2011-07-01

    During the period of 2007-2010 Skellefteaa Kraft AB erected a wind farm comprising 10 3 MW wind turbines on the mountain Uljabuouda in the municipality of Arjeplog. The turbines are of the type WWD-3 with a hub height of 80 meters and a rotor diameter of 90 meters. The Uljabuouda wind farm is one of the first erected above the treeline in the Swedish mountains. The wind turbines are adapted to cold climate equipped with an ice prevention system for the blades. The process of obtaining the necessary permits for the erection of the wind farm was lengthy and lasted during the period of 2000 to 2008. Also the procurement process took longer than expected. During the period of 2006-2008 when the procurement was performed it was difficult to find a supplier who could offer wind turbines equipped with a deicing system. In December 2006 the Uljabuouda project was granted a subsidy from the Swedish Energy Agency, the maximum of 35 million Swedish crowns. The final investment costs of the project will be higher than previously estimated. The main reason for this was the prevailing market conditions during the procurement period. The Uljabuouda wind farm is in full operation since the winter of 2010/2011 and so far our experiences are that the ice prevention system is working well even at harsh icing conditions

  7. The pedagogical and ethical legacy of a "successful" educational reform: The Citizen School Project

    Science.gov (United States)

    Fischman, Gustavo E.; Gandin, Luis Armando

    2016-02-01

    The Citizen School Project (Escola Cidadã) was implemented from 1993 to 2004 in Porto Alegre, capital of the Brazilian state of Rio Grande do Sul. This article presents the conception behind the Citizen School Project, the basic mechanisms created to implement and evaluate its strengths and weaknesses, and some of its contradictions. After contextualising the educational reforms in Brazil during the 1980s and 1990s, the authors demonstrate how the Citizen School Project's emphasis on participation and democratisation was a radical departure from Brazil's traditional public education system. Next, they present the three main goals and structures of the Citizen School Project - democratisation of access to schools, democratisation of schools' administration, and democratisation of access to knowledge. They conclude by discussing some pedagogic, social and political dynamics which appear to be strong legacies of this pedagogical project. The authors also argue that the Citizen School Project has both improved the quality of education in Porto Alegre and is an important contribution to our collective thinking about the politics of "successful" educational policies.

  8. Leadership Quality for Malaysia Construction Leader to Steer a Success Construction Project

    OpenAIRE

    Ngah Nasaruddin Nur Ain; Abdul Rahman Ismail

    2016-01-01

    Issues that dominate the construction industry for the long time such as time overrun, cost overrun, quality of construction and also safety during the construction process are difficult to resolve because of several factors involved which amongst them are leadership quality in the industry. Solving these issues can make the industry more sustainable in nature. This paper presents the need of leadership quality among construction parties involved to steer a construction project successfully. ...

  9. WP1 – Final project report

    NARCIS (Netherlands)

    Drachsler, Hendrik; Scheffel, Maren; Orrego, Carola; Stieger, Lina; Hartkopf, Kathleen; Henn, Patrick; Hynes, Helen; Przibilla, Monika; Geiger, Uschi; Schroeder, Hanna; Sopka, Sasa

    2015-01-01

    This report contains the complete project reporting of the PATIENT project from October 2012 until end of March 2015. It provides a summary of all project activities and achievements that are based on the previous WP deliverables such as the project progress reports from WP1 (D1.01) and the quality

  10. Computer Hardware, Advanced Mathematics and Model Physics pilot project final report

    International Nuclear Information System (INIS)

    1992-05-01

    The Computer Hardware, Advanced Mathematics and Model Physics (CHAMMP) Program was launched in January, 1990. A principal objective of the program has been to utilize the emerging capabilities of massively parallel scientific computers in the challenge of regional scale predictions of decade-to-century climate change. CHAMMP has already demonstrated the feasibility of achieving a 10,000 fold increase in computational throughput for climate modeling in this decade. What we have also recognized, however, is the need for new algorithms and computer software to capitalize on the radically new computing architectures. This report describes the pilot CHAMMP projects at the DOE National Laboratories and the National Center for Atmospheric Research (NCAR). The pilot projects were selected to identify the principal challenges to CHAMMP and to entrain new scientific computing expertise. The success of some of these projects has aided in the definition of the CHAMMP scientific plan. Many of the papers in this report have been or will be submitted for publication in the open literature. Readers are urged to consult with the authors directly for questions or comments about their papers

  11. 77 FR 5566 - Notice of Availability of the Final EIS for the HB In-Situ Solution Mine Project, Eddy County...

    Science.gov (United States)

    2012-02-03

    ...] Notice of Availability of the Final EIS for the HB In-Situ Solution Mine Project, Eddy County, New Mexico... Statement (Final EIS) for the HB In-Situ Solution Mine Project, and by this notice is announcing its... the Federal Register. ADDRESSES: Copies of the HB In-Situ Solution Mining EIS are available for public...

  12. An empirical analysis of the relationship between cost of control activities and project management success

    Directory of Open Access Journals (Sweden)

    Al-Tmeemy Samiaah

    2018-01-01

    Full Text Available To achieve the objectives of continuous improvement programs, construction managers must link the achievement of quality with cost. This paper aims to associate project management success (PMS with cost of control (COC activities in an empirical manner. Thus, the purpose is to determine the extent to which COC activities impact PMS. Quantitative method was adopted to collect data from Malaysian building companies using postal and email surveys. Hypothesis is tested using correlation and simple linear regression analysis. The findings of this study indicate that COC activities are positively associated with the PMS. The empirical evidences obtained from this research, provides financial justification for all quality improvement efforts. This can assist building contractors to enhance the success of project management by reducing the level of business failures due to poor quality, cost overruns, and delays.

  13. Phase V storage (Project W-112) Central Waste Complex operational readiness review, final report

    International Nuclear Information System (INIS)

    Wight, R.H.

    1997-01-01

    This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included

  14. Phase 5 storage (Project W-112) Central Waste Complex operational readiness review, final report

    Energy Technology Data Exchange (ETDEWEB)

    Wight, R.H.

    1997-05-30

    This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included.

  15. Final report for SNL/NM environmental drilling project

    International Nuclear Information System (INIS)

    Wemple, R.P.; Meyer, R.D.; Staller, G.E.; Layne, R.R.

    1994-11-01

    Concern for the environment and cost reduction are driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. The project has tested a variety of prototype machinery and hardware built by the industrial partner, Charles Machine Works (CMW), and SNL at several sites (Savannah River Site (SRS), Hanford, SNL, Kirtland AFB (KAFB), CMW), successfully installed usable horizontal environmental test wells at SRS and SNL/KAFB, and functioned as a clearing house for information regarding application of existing commercial machinery to a variety of governmental and commercial sites. The project has continued to test and develop machinery in FY 94. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of open-quotes cut/thrust and compact cuttings without adding large quantities of fluidclose quotes to an environmental problem site. This technology will be very cost-effective where applicable. Technology transfer and commercialization by CMW is ongoing and will continue into FY 95. Technology transfer to the private sector is ongoing and reflected in increasing machinery sales to environmental contractors. Education of regulatory agencies resulting in restructuring of appropriate regulatory standards for specification of the horizontal drilling techniques continues to be a long-range goal

  16. Final report for SNL/NM environmental drilling project

    Energy Technology Data Exchange (ETDEWEB)

    Wemple, R.P.; Meyer, R.D.; Staller, G.E. [Sandia National Labs., Albuquerque, NM (United States); Layne, R.R. [Charles Machine Works, Inc., Perry, OK (United States)

    1994-11-01

    Concern for the environment and cost reduction are driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. The project has tested a variety of prototype machinery and hardware built by the industrial partner, Charles Machine Works (CMW), and SNL at several sites (Savannah River Site (SRS), Hanford, SNL, Kirtland AFB (KAFB), CMW), successfully installed usable horizontal environmental test wells at SRS and SNL/KAFB, and functioned as a clearing house for information regarding application of existing commercial machinery to a variety of governmental and commercial sites. The project has continued to test and develop machinery in FY 94. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of {open_quotes}cut/thrust and compact cuttings without adding large quantities of fluid{close_quotes} to an environmental problem site. This technology will be very cost-effective where applicable. Technology transfer and commercialization by CMW is ongoing and will continue into FY 95. Technology transfer to the private sector is ongoing and reflected in increasing machinery sales to environmental contractors. Education of regulatory agencies resulting in restructuring of appropriate regulatory standards for specification of the horizontal drilling techniques continues to be a long-range goal.

  17. The International Successful School Principalship Project: Success Sustained?

    Science.gov (United States)

    Moos, Lejf; Johansson, Olof

    2009-01-01

    Purpose: The purpose of this paper is to synthesize the findings of the follow-up studies of successful school principals in six countries: Australia, Denmark, England, Norway, Sweden, and the USA. Design/methodology/approach: Data were categorized according to stakeholder expectations, the concept and practice of leadership, and the…

  18. Ensuring a successful family business management succession

    OpenAIRE

    Desbois, Joris

    2016-01-01

    Succession is the biggest long-term challenge that most family businesses face. Indeed, leaders ‘disposition to plan for their succession is frequently the key factor defining whether their family business subsists or stops. The research seeks to find out how to manage successfully the business management succession over main principles. This work project aims at researching the key points relevant to almost all family firms, to have a viable succession transition and positioni...

  19. Failure Forewarning in NPP Equipment NERI2000-109 Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Hively, LM

    2004-03-26

    The objective of this project is forewarning of machine failures in critical equipment at next-generation nuclear power plants (NPP). Test data were provided by two collaborating institutions: Duke Engineering and Services (first project year), and the Pennsylvania State University (Applied Research Laboratory) during the second and third project years. New nonlinear methods were developed and applied successfully to extract forewarning trends from process-indicative, time-serial data for timely, condition-based maintenance. Anticipation of failures in critical equipment at next-generation NPP will improve the scheduling of maintenance activities to minimize safety concerns, unscheduled non-productive downtime, and collateral damage due to unexpected failures. This approach provides significant economic benefit, and is expected to improve public acceptance of nuclear power. The approach is a multi-tiered, model-independent, and data-driven analysis that uses ORNL's novel nonlinear method to extract forewarning of machine failures from appropriate data. The first tier of the analysis provides a robust choice for the process-indicative data. The second tier rejects data of inadequate quality. The third tier removes signal artifacts that would otherwise confound the analysis, while retaining the relevant nonlinear dynamics. The fourth tier converts the artifact-filtered time-serial data into a geometric representation, that is then transformed to a discrete distribution function (DF). This method allows for noisy, finite-length datasets. The fifth tier obtains dissimilarity measures (DM) between the nominal-state DF and subsequent test-state DFs. Forewarning of a machine failure is indicated by several successive occurrences of the DM above a threshold, or by a statistically significant trend in the DM. This paradigm yields robust nonlinear signatures of degradation and its progression, allowing earlier and more accurate detection of the machine failure.

  20. Characterization of unpaved road condition through the use of remote sensing project - phase II, deliverable 8-D: final report.

    Science.gov (United States)

    2016-03-07

    Building on the success of developing a UAV based unpaved road assessment system in Phase I, the project team was awarded a Phase II project by the USDOT to focus on outreach and implementation. The project team added Valerie Lefler of Integrated Glo...

  1. Final Report for the ADMX Phase 2a Project at the University of Washington

    International Nuclear Information System (INIS)

    Rosenberg, Leslie J.

    2015-01-01

    This is a final report of the ADMX (Axion Dark Matter eXperiment) Phase 2a program. This program is a project allowing for a sensitive axion dark-matter search at higher axion masses. The Phase 2a program also prepares the project for lower temperature anticipated in later operations. The Phase 2a program includes sensitive data-taking operations at two cavity modes, TM010 and TM020, allowing for faster data-taking operations and extending the search to higher and plausible dark-matter axion masses.

  2. Emergency Fish Restoration Project; Final Report 2002.

    Energy Technology Data Exchange (ETDEWEB)

    LeCaire, Richard

    2003-03-01

    Lake Roosevelt is a 151-mile impoundment created by the construction of Grand Coulee Dam during the early 1940's. The construction of the dam permanently and forever blocked the once abundant anadromous fish runs to the upper Columbia Basin. Since the construction of Grand Coulee Dam in 1943 and Chief Joseph Dam in 1956 this area is known as the blocked area. The blocked area is totally dependant upon resident fish species to provide a subsistence, recreational and sport fishery. The sport fishery of lake Roosevelt is varied but consists mostly of Rainbow trout (Oncorhynchus mykiss), Kokanee salmon (Oncorhynchus nerka), Walleye (Stizostedion vitreum) Small mouth bass (Micropterus dolomieui) and white sturgeon (Acipenser transmontanus). Currently, Bonneville Power Administration funds and administers two trout/kokanee hatcheries on Lake Roosevelt. The Spokane Tribe of Indians operates one hatchery, the Washington Department of Fish and Wildlife the other. In addition to planting fish directly into Lake Roosevelt, these two hatcheries also supply fish to a net pen operation that also plants the lake. The net pen project is administered by Bonneville Power funded personnel but is dependant upon volunteer labor for daily feeding and monitoring operations. This project has demonstrated great success and is endorsed by the Colville Confederated Tribes, the Spokane Tribe of Indians, the Washington Department of Fish and Wildlife, local sportsmen associations, and the Lake Roosevelt Forum. The Lake Roosevelt/Grand Coulee Dam area is widely known and its diverse fishery is targeted by large numbers of anglers annually to catch rainbow trout, kokanee salmon, small mouth bass and walleye. These anglers contribute a great deal to the local economy by fuel, grocery, license, tackle and motel purchases. Because such a large portion of the local economy is dependant upon the Lake Roosevelt fishery and tourism, any unusual operation of the Lake Roosevelt system may have a

  3. Relacionamento entre gerenciamento de risco e sucesso de projetos Relationship between risk management and project success

    Directory of Open Access Journals (Sweden)

    Roque Rabechini Junior

    2012-01-01

    Full Text Available Este trabalho apresenta os resultados de uma pesquisa feita em quatro estados brasileiros sobre adoção de práticas de gerenciamento de riscos em projetos com diferentes tipos de complexidade. A pesquisa de campo envolveu 415 projetos de nove setores econômicos distintos. O material obtido foi coletado por meio de questionário aplicado em gerentes e membros de equipe de projetos. Os resultados mostraram que há impacto significativo e positivo da adoção de práticas de gerenciamento de riscos no sucesso dos projetos. Mostrou também que há dependência entre percepção de sucesso e presença/ausência de gerente de risco, havendo impacto positivo da presença do gerente de risco no sucesso dos projetos. As principais limitações da pesquisa concernem às escolhas metodológicas de amostra não probabilística, empregando questionário baseado na percepção dos respondentes. O trabalho originalmente integra a visão de práticas de gerenciamento de riscos com resultados em projetos, servindo de base para novos estudos em outros setores e áreas de conhecimento de projetos.This paper presents the results of an investigation in four Brazilian States on the adoption of Risk Management practices in projects with different complexity levels. The field research involved 415 projects from nine different economic sectors. Data was gathered through a questionnaire applied to managers and project team members. Results showed that there are significant and positive impacts in the adoption of Risk Management practices on project success. It also showed that there is dependence between perceived success and the presence/absence of a risk manager, i.e., the presence of a risk manager has positive impacts on project success. The major limitation of this study concerns the methodological choice: non-probability sample survey based on respondents perception. The work promotes the integration between Risk Management practices and projects performance

  4. Parent Attitudes Toward the Virginia Beach Year-Round School Pilot Project. Final Report.

    Science.gov (United States)

    Schlechty, Phillip C.

    Part of the Virginia Beach year-round school program evaluation, this final report contains a detailed analysis of parental attitudes, beliefs, and perceptions. The data leads to the following conclusions: a majority (53.3 percent) of parents are dubious or negative toward the 45-15 pilot project; a slight majority of parents in the pilot schools…

  5. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen

    2002-03-01

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

  6. Final Verification Success Story Using the Triad Approach at the Oak Ridge National Laboratory's Melton Valley Soils and Sediment Project

    International Nuclear Information System (INIS)

    King, D.A.; Haas, D.A.; Cange, J.B.

    2006-01-01

    The United States Environmental Protection Agency recently published guidance on the Triad approach, which supports the use of smarter, faster, and better technologies and work strategies during environmental site assessment, characterization, and cleanup. The Melton Valley Soils and Sediment Project (Project) at the Oak Ridge National Laboratory embraced this three-pronged approach to characterize contaminants in soil/sediment across the 1000-acre Melton Valley Watershed. Systematic Project Planning is the first of three prongs in the Triad approach. Management initiated Project activities by identifying key technical personnel, included regulators early in the planning phase, researched technologies, and identified available resources necessary to meet Project objectives. Dynamic Work Strategies is the second prong of the Triad approach. Core Team members, including State and Federal regulators, helped develop a Sampling and Analysis Plan that allowed experienced field managers to make real-time, in-the-field decisions and, thus, to adjust to conditions unanticipated during the planning phase. Real-time Measurement Technologies is the third and last prong of the Triad approach. To expedite decision-making, the Project incorporated multiple in-field technologies, including global positioning system equipment integrated with field screening instrumentation, magnetometers for utility clearance, and an on-site gamma spectrometer (spec) for rapid contaminant speciation and quantification. As a result of a relatively complex but highly efficient program, a Project field staff of eight collected approximately 1900 soil samples for on-site gamma spec analysis (twenty percent were also shipped for off-site analyses), 4.7 million gamma radiation measurements, 1000 systematic beta radiation measurements, and 3600 systematic dose rate measurements between July 1, 2004, and October 31, 2005. The site database previously contained results for less than 500 soil samples dating

  7. Resource Roads demonstration project : final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-07-15

    British Columbia's vast network of resource roads are considered to be amongst the most dangerous, high-risk workplaces in the province. Resource roads, also known as industrial roads, forest service roads, or petroleum development roads, present several unique safety challenges as workplaces. They are built for the purpose of access, egress and transport of materials, resources, equipment and people. However, the lack the same diligence of enforcement and a consistent design, construction, maintenance and standard for use as public highways or municipal roads. There are also safety challenges related to public use of resource roads. This report presented a project, called ResourceRoads by WorkSafe BC that focused on the organization and implementation of a management structure that would provide a system of coordination and a process of compliance for the users of the defined road systems. The project was based on information gathered in two forest districts of Prince George and the South Peace Forest Districts. A committee consisting of the actual owner of the road and other users was formed. The report presented a history of British Columbia's resource road system, and discussed resource roads as industrial workplaces and worksites, as well as resource road fatality statistics. The demonstration project was outlined in terms of project leadership; scope; strategic objectives; project purpose; performance objectives; project communication; demonstration areas; and project stages. Project fundamentals and project findings were also presented along with recommendations and responses to the Auditor General report and the Forest Safety Ombudsman report. It was concluded that potential uses of new technologies for resource road vehicles should be reviewed. tabs., figs.

  8. Smart Intelligent Aircraft Structures (SARISTU) : Proceedings of the Final Project Conference

    CERN Document Server

    Papadopoulos, Michael

    2016-01-01

    The book includes the research papers presented in the final conference of the EU funded SARISTU (Smart Intelligent Aircraft Structures) project, held at Moscow, Russia between 19-21 of May 2015. The SARISTU project, which was launched in September 2011, developed and tested a variety of individual applications as well as their combinations. With a strong focus on actual physical integration and subsequent material and structural testing, SARISTU has been responsible for important progress on the route to industrialization of structure integrated functionalities such as Conformal Morphing, Structural Health Monitoring and Nanocomposites. The gap- and edge-free deformation of aerodynamic surfaces known as conformal morphing has gained previously unrealized capabilities such as inherent de-icing, erosion protection and lightning strike protection, while at the same time the technological risk has been greatly reduced. Individual structural health monitoring techniques can now be applied at the part-manufacturin...

  9. Engineering schedule control of nuclear power project planning and management

    International Nuclear Information System (INIS)

    Meng Hao

    2014-01-01

    Nuclear power design is the important part of project management of nuclear power project, it is the way to control the project organization, design schedule, design progress, design quality and cost control. The good schedule system and control is the key to the success for the project. It is also analyzed the problem during the project, by using some theory and analyze the project structure, design schedule management, IED and document management and interface management propose some new idea for better improve the design management to finally better improve the management quality and efficiency. (author)

  10. Development and test of ion emitter modules for the projects ASPOC/CLUSTER (8th project year) and EQUATOR-S (4th project year). Final report

    International Nuclear Information System (INIS)

    Fehringer, H.M.; Ruedenauer, F.G.; Steiger, W.

    1997-02-01

    Not only was the failure of flight V001 of the newly developed ARIANE-V rocket a disaster for the European space industry and a drawback in the highly competitive launcher business, with the loss of its payload, ESA's 4 scientific CLUSTER satellites, also the work and expectations of hundreds of scientists and engineers were buried in the swamps of French Guyana. The Austrian experiment ASPOC, for which ion emitters have been developed under the contract reported here, was one of the 12 instruments onboard. In a meeting following the launch failure ESA's Science Policy Committee (SPC) decided to immediately rebuild one CLUSTER satellite and use the instrument spare models as the payload. This new mission was called PHOENIX. Furthermore, the SPC initiated studies to look for options of a CLUSTER reflight. The final decision about the future of the CLUSTER project is now due in February 1997. Since ASPOC has been lost, this report only very shortly deals with the work done up to the launch date. More important are two aspects: First, the ion emitters, the product which has been developed within this long term project, are of such high quality that they survived both the explosion of the rocket and the subsequent free fall from 3.6 km height. Ten ion emitters have been recovered from the debris and all of them were still working well. Second, new applications both in the scientific and in the commercial area have been found for the indium ion sources. Under an ESA contract their potential use as ion thrusters has recently successfully been studied. A further contract now has been placed for the development of a prototype ion thruster. Furthermore, the indium ion source has been selected as the primary ion emitter for the time of flight mass spectrometer COSIMA, a key instrument of the ROSETTA mission. Concerning EQUATOR-S, a new set of ion emitter modules has to be built, as those originally foreseen for EQUATOR-S are now being used for PHOENIX. The respective

  11. UCSD Performance in the Edge Plasma Simulation (EPSI) Project. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Tynan, George Robert [Univ. of California, San Diego, CA (United States). Center for Energy Research

    2017-12-12

    This report contains a final report on the activities of UC San Diego PI G.R. Tynan and his collaborators as part of the EPSI Project, that was led by Dr. C.S. Chang, from PPPL. As a part of our work, we carried out several experiments on the ALCATOR C-­MOD tokamak device, aimed at unraveling the “trigger” or cause of the spontaneous transition from low-­mode confinement (L-­mode) to high confinement (H-­mode) that is universally observed in tokamak devices, and is planned for use in ITER.

  12. How internal audit can contribute to the success of ERP implementation projects in an Irish context.

    OpenAIRE

    Bennett, John Michael Anthony

    2014-01-01

    non-peer-reviewed The aim of this study is to explore how Internal Audit can contribute towards the successful implementation of ERP (Enterprise Resource Planning) projects in an Irish context. ERP projects are well documented for high failure rates and adverse impact on receiving businesses. Although there is limited literature available concerning the role of Internal Audit within ERP implementations, there is plenty available relating to ERP implementations which document risks, problem...

  13. Criteria for Developing a Successful Privatization Project

    Science.gov (United States)

    1989-05-01

    conceptualization and planning are required when pursuing privatization projects. In fact, privatization project proponents need to know how to...selection of projects for analysis, methods of acquiring information about these projects, and the analysis framwork . Chapter IV includes the analysis. A...performed an analysis to determine cormion conceptual and creative approaches and lessons learned. This analysis was then used to develop criteria for

  14. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments

    Energy Technology Data Exchange (ETDEWEB)

    None

    1999-02-01

    This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

  15. Harmony in Career Learning and Scholastic System (Project HI-CLASS). Final Evaluation Report 1992-93. OREA Report.

    Science.gov (United States)

    Duque, Diana L.

    Harmony in Career Learning and Scholastic System (Project HI-CLASS) was a Transitional Bilingual Education Title VII-funded program in its fifth and final year in 1992-93. The project offered instructional and support services to 641 students of limited English proficiency (LEP) at three sites, all of which had many immigrant students, in…

  16. Macroencapsulation of mixed waste debris at the Hanford Nuclear Reservation -- Final project report by AST Environmental Services, LLC

    International Nuclear Information System (INIS)

    Baker, T.L.

    1998-01-01

    This report summarizes the results of a full-scale demonstration of a high density polyethylene (HDPE) package, manufactured by Arrow Construction, Inc. of Montgomery, Alabama. The HDPE package, called ARROW-PAK, was designed and patented by Arrow as both a method to macroencapsulation of radioactively contaminated lead and as an improved form of waste package for treatment and interim and final storage and/or disposal of drums of mixed waste. Mixed waste is waste that is radioactive, and meets the criteria established by the United States Environmental Protection Agency (US EPA) for a hazardous material. Results from previous testing conducted for the Department of Energy (DOE) at the Idaho National Engineering Laboratory in 1994 found that the ARROW-PAK fabrication process produces an HDPE package that passes all helium leak tests and drop tests, and is fabricated with materials impervious to the types of environmental factors encountered during the lifetime of the ARROW-PAK, estimated to be from 100 to 300 years. Arrow Construction, Inc. has successfully completed full-scale demonstration of its ARROW-PAK mixed waste macroencapsulation treatment unit at the DOE Hanford Site. This testing was conducted in accordance with Radiological Work Permit No. T-860, applicable project plans and procedures, and in close consultation with Waste Management Federal Services of Hanford, Inc.'s project management, health and safety, and quality assurance representatives. The ARROW-PAK field demonstration successfully treated 880 drums of mixed waste debris feedstock which were compacted and placed in 149 70-gallon overpack drums prior to macroencapsulation in accordance with the US EPA Alternate Debris Treatment Standards, 40 CFR 268.45. Based on all of the results, the ARROW-PAK process provides an effective treatment, storage and/or disposal option that compares favorably with current mixed waste management practices

  17. Kansas Advanced Semiconductor Project: Final Report

    International Nuclear Information System (INIS)

    Baringer, P.; Bean, A.; Bolton, T.; Horton-Smith, G.; Maravin, Y.; Ratra, B.; Stanton, N.; von Toerne, E.; Wilson, G.

    2007-01-01

    KASP (Kansas Advanced Semiconductor Project) completed the new Layer 0 upgrade for D0, assumed key electronics projects for the US CMS project, finished important new physics measurements with the D0 experiment at Fermilab, made substantial contributions to detector studies for the proposed e+e- international linear collider (ILC), and advanced key initiatives in non-accelerator-based neutrino physics.

  18. Key Success Factors in Business Intelligence

    Directory of Open Access Journals (Sweden)

    Szymon Adamala

    2011-12-01

    Full Text Available Business Intelligence can bring critical capabilities to an organization, but the implementation of such capabilities is often plagued with problems. Why is it that certain projects fail, while others succeed? The aim of this article is to identify the factors that are present in successful Business Intelligence projects and to organize them into a framework of critical success factors. A survey was conducted during the spring of 2011 to collect primary data on Business Intelligence projects. Findings confirm that Business Intelligence projects are wrestling with both technological and non-technological problems, but the non-technological problems are found to be harder to solve as well as more time consuming than their counterparts. The study also shows that critical success factors for Business Intelligence projects are different from success factors for Information Systems projects in general. Business Intelligences projects have critical success factors that are unique to the subject matter. Major differences can be found primarily among non-technological factors, such as the presence of a specific business need and a clear vision to guide the project. Success depends on types of project funding, the business value provided by each iteration in the project and the alignment of the project to a strategic vision for Business Intelligence at large. Furthermore, the study provides a framework for critical success factors that, explains sixty-one percent of variability of success for projects. Areas which should be given special attention include making sure that the Business Intelligence solution is built with the end users in mind, that the Business Intelligence solution is closely tied to the company’s strategic vision and that the project is properly scoped and prioritized to concentrate on the best opportunities first.

  19. DIMEC - Final Report

    DEFF Research Database (Denmark)

    Conrad, Finn

    1997-01-01

    Final report of the research project DIMEC - Danish InfoMechatronic Control supported by the Danish Technical Research Council, STVF.......Final report of the research project DIMEC - Danish InfoMechatronic Control supported by the Danish Technical Research Council, STVF....

  20. Leadership Development Program Final Project

    Science.gov (United States)

    Parrish, Teresa C.

    2016-01-01

    TOSC is NASA's prime contractor tasked to successfully assemble, test, and launch the EM1 spacecraft. TOSC success is highly dependent on design products from the other NASA Programs manufacturing and delivering the flight hardware; Space Launch System(SLS) and Multi-Purpose Crew Vehicle(MPCV). Design products directly feed into TOSC's: Procedures, Personnel training, Hardware assembly, Software development, Integrated vehicle test and checkout, Launch. TOSC senior management recognized a significant schedule risk as these products are still being developed by the other two (2) programs; SVE and ACE positions were created.

  1. 77 FR 23740 - Sears Point Wetland and Watershed Restoration Project, Sonoma County, CA; Final Environmental...

    Science.gov (United States)

    2012-04-20

    ...-FF08RSFC00] Sears Point Wetland and Watershed Restoration Project, Sonoma County, CA; Final Environmental... environmental impact report and environmental impact statement (EIR/EIS) for the Sears Point Wetland and..., while providing public access and recreational and educational opportunities compatible with ecological...

  2. Virginia Solar Pathways Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Bond, Katharine; Cosby, Sarah

    2018-03-28

    This Report provides a technical review of the final results of a funding award to Virginia Electric and Power Company (Dominion Energy Virginia (DEV) or the Company) for a project under the U.S. Department of Energy’s Solar Energy Technologies Office. The three-year project was formally known as the Virginia Solar Pathways Project (VSPP or the Project). The purpose of the VSPP was to develop a collaborative utility-administered solar strategy (Solar Strategy) for DEV’s service territory in the Commonwealth that could serve as a replicable model for other states with similar policy environments. The U.S. Department of Energy (DOE) funding award enabled DEV to take a focused approach to developing the Solar Strategy for its Virginia service territory. The structure and funding from the DOE award also facilitated valuable input from a formal stakeholder team convened to serve as advisors (Advisory Team) to the VSPP and contribute their perspectives and expertise to both the analysis and strategy development aspects of the Project. The development of the Solar Strategy involved three main goals: • Establish a policy and program framework that would integrate existing solar programs with new options appropriate for the Commonwealth’s policy environment and broader economic development objectives; • Promote wider deployment of solar within a low retail electric rate environment; and • Serve as a sustainable, utility-administered solar model that could be replicated in other states with similar policy environments, including, but not limited to, the entire Southeast region. In support of the VSPP goals, the Project Team commissioned four studies to support the Solar Strategy development. Two studies, completed by Navigant Consulting, focused on the integration of solar into the electric grid. The first solar integration study focused on integration of solar into the distribution grid where the utility system directly connects to and serves end-use customers

  3. Projected near-future levels of temperature and pCO2 reduce coral fertilization success.

    Directory of Open Access Journals (Sweden)

    Rebecca Albright

    Full Text Available Increases in atmospheric carbon dioxide (pCO2 are projected to contribute to a 1.1-6.4°C rise in global average surface temperatures and a 0.14-0.35 reduction in the average pH of the global surface ocean by 2100. If realized, these changes are expected to have negative consequences for reef-building corals including increased frequency and severity of coral bleaching and reduced rates of calcification and reef accretion. Much less is known regarding the independent and combined effects of temperature and pCO2 on critical early life history processes such as fertilization. Here we show that increases in temperature (+3°C and pCO2 (+400 µatm projected for this century negatively impact fertilization success of a common Indo-Pacific coral species, Acropora tenuis. While maximum fertilization did not differ among treatments, the sperm concentration required to obtain 50% of maximum fertilization increased 6- to 8- fold with the addition of a single factor (temperature or CO2 and nearly 50- fold when both factors interact. Our results indicate that near-future changes in temperature and pCO2 narrow the range of sperm concentrations that are capable of yielding high fertilization success in A. tenuis. Increased sperm limitation, in conjunction with adult population decline, may have severe consequences for coral reproductive success. Impaired sexual reproduction will further challenge corals by inhibiting population recovery and adaptation potential.

  4. Project Execution Plan,Rev. 3; FINAL

    International Nuclear Information System (INIS)

    IT Corporation, Las Vegas

    2002-01-01

    This plan addresses project activities encompassed by the U.S. Department of Energy's (DOE's), National Nuclear Security Administration Nevada Operations Office, Environmental Restoration Division and conforms to the requirements contained in the Life-Cycle Asset Management, DOE Order 430.1A; The Joint Program Office Policy on Project Management in Support of DOE Order 430.1; Program and Project Management for the Acquisition of Capital Assets, DOE Order 413.3; the Project Execution and Engineering Management Planning Guide, GPG-FM-010; and other applicable Good Practice Guides; and the FY 2001 Integrated Planning, Accountability, and Budgeting System Policy Guidance. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense; and traditional project management philosophies such as the development of life-cycle costs, schedules, and work scope; identification o f roles and responsibilities; and baseline management and controls

  5. Smart Gun Technology project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Weiss, D.R.

    1996-05-01

    The goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user form firing a law officer`s firearm by implementing user-recognizing-and-authorizing (or {open_quotes}smart{close_quotes}) surety technologies. This project was funded by the National Institute of Justice. This report lists the findings and results of the project`s three primary objectives. First, to find and document the requirements for a smart firearm technology that law enforcement officers will value. Second, to investigate, evaluate, and prioritize technologies that meet the requirements for a law enforcement officer`s smart firearm. Third, to demonstrate and document the most promising technology`s usefulness in models of a smart firearm.

  6. Writing a Successful Fulbright Group Projects Abroad Grant: Voices from a Journey to South Africa

    Science.gov (United States)

    Kruger, Darrell P.; Gandy, S. Kay; Bechard, Amber; Brown, Randy; Williams, Diane

    2009-01-01

    The authors share a successful Fulbright Group Projects Abroad grant award. The purpose of the grant was to enhance American educators' experience and knowledge of South Africa, in particular, and sub-Saharan Africa more generally. Toward that end, participants experienced a multifaceted view of South Africa's geographical diversity, both physical…

  7. Final Report Sustained Spheromak Physics Project FY 1997 - FY 1999

    International Nuclear Information System (INIS)

    Hooper, E.B.; Hill, D.N.

    2000-01-01

    This is the final report on the LDRD SI-funded Sustained Spheromak Physics Project for the years FY1997-FY1999, during which the SSPX spheromak was designed, built, and commissioned for operation at LLNL. The specific LDRD project covered in this report concerns the development, installation, and operation of specialized hardware and diagnostics for use on the SSPX facility in order to study energy confinement in a sustained spheromak plasma configuration. The USDOE Office of Fusion Energy Science funded the construction and routine operation of the SSPX facility. The main distinctive feature of the spheromak is that currents in the plasma itself produce the confining toroidal magnetic field, rather than external coils, which necessarily thread the vacuum vessel. There main objective of the Sustained Spheromak Physics Project was to test whether sufficient energy confinement could be maintained in a spheromak plasma sustained by DC helicity injection. Achieving central electron temperatures of several hundred eV would indicate this. In addition, we set out to determine how the energy confinement scales with T c and to relate the confinement time to the level of internal magnetic turbulence. Energy confinement and its scaling are the central technical issues for the spheromak as a fusion reactor concept. Pending the outcome of energy confinement studies now under way, the spheromak could be the basis for an attractive fusion reactor because of its compact size, simply-connected magnetic geometry, and potential for steady-state current drive

  8. Managing a sensitive project

    International Nuclear Information System (INIS)

    Etcheber, Pascal

    1998-01-01

    A 'sensitive' project needs to be managed differently from a 'normal' project. This statement might seem simple enough. However, it does not seem to be a simple task to prove it in twenty minutes. This paper is an attempt to share with the audience some of the experiences the company had dealing with sensitive projects. It describes what a sensitive project is, though of all people, the 'nuclear' should know. Then the common mistakes are described, that are made in the hoping that some personal experiences are recognised. Finally the company's strategy is shown, how we foster third party support and the main tools to be used. Ultimately, success is ensured by having a sufficient quantity of allies. A sensitive project does not die because it has too many opponents, but because it has too few allies. Finding and helping allies to act is the thrust of our activity. It enables sensitive projects which deserve to succeed to do so, where traditional management fails miserably

  9. Prioritising Project Scope Definition Elements in Public Building Projects

    Directory of Open Access Journals (Sweden)

    Mohammed K Fageha

    2014-09-01

    Full Text Available A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI as a basis, the study uses analytical network process (ANP technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage. Keywords: Project scope definition, pre-project planning, prioritising, public building projects, Saudi Arabia, Analytical Network Process (ANP

  10. The final disposal of radioactive wastes as social, political and scientific project - an introduction; Ewigkeitslasten. Die ''Endlagerung'' radioaktiver Abfaelle als soziales, politisches und wissenschaftliches Projekt - eine Einfuehrung

    Energy Technology Data Exchange (ETDEWEB)

    Brunnengraeber, Achim

    2015-07-01

    The nuclear power production that was productive for two generations produces radioactive wastes that will be a hazardous and financial burden for many future generations. Science, politics, industry and the society are responsible to find a successful solution for the project of final disposal of radioactive wastes. With the fast development of renewable energies with the perspectives of sustainability and other advantages nuclear power will not have a remarkable future. The search for a final repository site is a tremendous governmental, economic and public challenge but can also be seen as a social chance. Democracy could be enforced by this process, public commitment, transparency, co-determination, confidence in political processes are indispensible premises.

  11. Umatilla Satellite and Release Sites Project : Final Siting Report.

    Energy Technology Data Exchange (ETDEWEB)

    Montgomery, James M.

    1992-04-01

    This report presents the results of site analysis for the Umatilla Satellite and Release Sites Project. The purpose of this project is to provide engineering services for the siting and conceptual design of satellite and release facilities for the Umatilla Basin hatchery program. The Umatilla Basin hatchery program consists of artificial production facilities for salmon and steelhead to enhance production in the Umatilla River as defined in the Umatilla master plan approved in 1989 by the Northwest Power Planning Council. Facilities identified in the master plan include adult salmon broodstock holding and spawning facilities, facilities for recovery, acclimation, and/or extended rearing of salmon juveniles, and development of river sites for release of hatchery salmon and steelhead. The historic and current distribution of fall chinook, summer chinook, and coho salmon and steelhead trout was summarized for the Umatilla River basin. Current and future production and release objectives were reviewed. Twenty seven sites were evaluated for the potential and development of facilities. Engineering and environmental attributes of the sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  12. Mechanical Thrombectomy using a solitaire stent in acute ischemic stroke; The relationship between the visible antegrade flow on first device deployment and final success in revascularization

    International Nuclear Information System (INIS)

    Lee, Sung Ho; Lee, Byung Hon; Hwang, Yoon Joon; Kim, Su Young; Lee, Ji Young; Hong, Keun Sik; Cho, Yong Jin

    2015-01-01

    The purpose of the study was to evaluate the relationship between the successful revascularization on the first Solitaire stent deployment and the successful revascularization on the final angiography in acute ischemic stroke. From February 2012 to April 2014, 24 patients who underwent Solitaire stent thrombectomy as the first thrombectomy method for treatment of acute ischemic strokes were retrospectively reviewed. When the first Solitaire stent was deployed, 9 patients showed revascularization (Group 1) and 15 patients did not show revascularization (Group 2). Revascularization immediately after the first Solitaire stent removal and on the final angiography were comparatively assessed between the 2 groups. Statistical analysis was performed by the Fisher exact test and Student's t-test. The rates of revascularization maintenance immediately after the first Solitaire stent removal were 89% in Group 1 and 27% in Group 2, respectively (p = 0.009), and the rates of final successful revascularization were 100% in Group 1 and 47% in Group 2, respectively (p = 0.009). There was a statistically significant difference between the 2 groups. Revascularization on the first Solitaire stent deployment can be a useful predictor in evaluating the success of final revascularization in the treatment of acute ischemic stroke.

  13. [Doctoral thesis projects for medical students? Retrospective estimation of the fraction of successfully completed medical doctoral thesis projects at Witten/Herdecke University].

    Science.gov (United States)

    Scharfenberg, Janna; Schaper, Katharina; Krummenauer, Frank

    2014-01-01

    The German "Dr med" plays a specific role in doctoral thesis settings since students may start the underlying doctoral project during their studies at medical school. If a Medical Faculty principally encourages this approach, then it should support the students in performing the respective projects as efficiently as possible. Consequently, it must be ensured that students are able to implement and complete a doctoral project in parallel to their studies. As a characteristic efficiency feature of these "Dr med" initiatives, the proportion of doctoral projects successfully completed shortly after graduating from medical school is proposed and illustrated. The proposed characteristic can be estimated by the time period between the state examination (date of completion of the qualifying medical examination) and the doctoral examination. Completion of the doctoral project "during their medical studies" was then characterised by a doctoral examination no later than 12 months after the qualifying medical state examination. To illustrate the estimation and interpretation of this characteristic, it was retrospectively estimated on the basis of the full sample of all doctorates successfully completed between July 2009 and June 2012 at the Department of Human Medicine at the Faculty of Health of the University of Witten/Herdecke. During the period of investigation defined, a total number of 56 doctoral examinations were documented, 30 % of which were completed within 12 months after the qualifying medical state examination (95% confidence interval 19 to 44 %). The median duration between state and doctoral examination was 27 months. The proportion of doctoral projects completed parallel to the medical studies increased during the investigation period from 14 % in the first year (July 2009 till June 2010) to 40 % in the third year (July 2011 till June 2012). Only about a third of all "Dr med" projects at the Witten/Herdecke Faculty of Health were completed during or close to

  14. Final Year Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Hubsch, Tristan [Howard University

    2013-06-20

    In the last years of this eighteen-year grant project, the research efforts have focused mostly on the study of off-shell representations of supersymmetry, both on the worldline and on the world- sheet, i.e., both in supersymmetric quantum mechanics and in supersymmetric field theory in 1+1-dimensional spacetime.

  15. ACCESS Project: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Weller, Heiko [Robert Bosch, LLC, Farmington Hills, MI (United States)

    2015-04-01

    The ACCESS project addressed the development, testing, and demonstration of the proposed advanced technologies and the associated emission and fuel economy improvement at an engine dynamometer and on a full-scale vehicle. Improve fuel economy by 25% with minimum performance penalties Achieve SULEV level emissions with gasoline Demonstrate multi-mode combustion engine management system

  16. Final project report for NEET pulsed ion beam project

    Energy Technology Data Exchange (ETDEWEB)

    Kucheyev, S. O. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2018-01-11

    The major goal of this project was to develop and demonstrate a novel experimental approach to access the dynamic regime of radiation damage formation in nuclear materials. In particular, the project exploited a pulsed-ion-beam method in order to gain insight into defect interaction dynamics by measuring effective defect interaction time constants and defect diffusion lengths. This project had the following four major objectives: (i) the demonstration of the pulsed ion beam method for a prototypical nuclear ceramic material, SiC; (ii) the evaluation of the robustness of the pulsed beam method from studies of defect generation rate effects; (iii) the measurement of the temperature dependence of defect dynamics and thermally activated defect-interaction processes by pulsed ion beam techniques; and (iv) the demonstration of alternative characterization techniques to study defect dynamics. As we describe below, all these objectives have been met.

  17. Long term Gas Supply Security in an Enlarged Europe. Final Report ENGAGED Project

    International Nuclear Information System (INIS)

    Van Oostvoorn, F.; Likachev, V.; Morgan, T.

    2004-12-01

    The title project concerned a study on the long-term gas supply security in Europe with a focus on the developments, risks and policies in the candidate countries in Eastern Europe. For that reason the report not only includes a European and EU-30 wide scenario analysis but also chapters on specific topics. One study (a chapter in this report) concerns the gas market and regulation developments in a number of relevant candidate countries. Another chapter presents a Russian vision on gas demand, production and supplies from Russia and also includes a paragraph on the supplies from other neighbours and the transit issues in the Ukraine. Finally, the report contains a chapter discussing the required network infrastructure for bringing the gas from external gas suppliers to the EU-30 markets. Hereby it analysis and tests the network flexibility to cope with some unlikely and unexpected supply interruptions in main pipelines to EU markets. The background information of the studies underlying the chapters can be partly found in the annexes and in the individual task reports. During the project the results of the study were discussed at several seminars in candidate countries and particularly on the final seminar in Prague, in June 2003, with different and important stakeholders and market actors

  18. Independent management and financial review, Yucca Mountain Project, Nevada. Final report, Appendix

    International Nuclear Information System (INIS)

    1995-01-01

    The Nuclear Waste Policy Act of 1982 (Public Law 97-425), as amended by Public Law 100-203, December 22, 1987, established the Office of Civilian Radioactive Waste Management (OCRWM) within the Department of Energy (DOE), and directed the Office to investigate a site at Yucca Mountain, Nevada, to determine if this site is suitable for the construction of a repository for the disposal of high level nuclear waste. Work on site characterization has been under way for several years. Thus far, about $1.47 billion have been spent on Yucca Mountain programs. This work has been funded by Congressional appropriations from a Nuclear Waste Fund to which contributions have been made by electric utility ratepayers through electric utilities generating power from nuclear power stations. The Secretary of Energy and the Governor of the State of Nevada have appointed one person each to a panel to oversee an objective, independent financial and management evaluation of the Yucca Mountain Project. The Requirements for the work will include an analysis of (1) the Yucca Mountain financial and, contract management techniques and controls; (2) Project schedules and credibility of the proposed milestones; (3) Project organizational effectiveness and internal planning processes, and (4) adequacy of funding levels and funding priorities, including the cost of infrastructure and scientific studies. The recipient will provide monthly progress report and the following reports/documents will be presented as deliverables under the contract: (1) Financial and Contract Management Preliminary Report; (2) Project Scheduling Preliminary Report; (3)Project Organizational Effectiveness Preliminary Report; (4) Project Funding Levels and Funding Priorities Preliminary Report; and (5) Final Report

  19. Independent management and financial review, Yucca Mountain Project, Nevada. Final report, Appendix

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-15

    The Nuclear Waste Policy Act of 1982 (Public Law 97-425), as amended by Public Law 100-203, December 22, 1987, established the Office of Civilian Radioactive Waste Management (OCRWM) within the Department of Energy (DOE), and directed the Office to investigate a site at Yucca Mountain, Nevada, to determine if this site is suitable for the construction of a repository for the disposal of high level nuclear waste. Work on site characterization has been under way for several years. Thus far, about $1.47 billion have been spent on Yucca Mountain programs. This work has been funded by Congressional appropriations from a Nuclear Waste Fund to which contributions have been made by electric utility ratepayers through electric utilities generating power from nuclear power stations. The Secretary of Energy and the Governor of the State of Nevada have appointed one person each to a panel to oversee an objective, independent financial and management evaluation of the Yucca Mountain Project. The Requirements for the work will include an analysis of (1) the Yucca Mountain financial and, contract management techniques and controls; (2) Project schedules and credibility of the proposed milestones; (3) Project organizational effectiveness and internal planning processes, and (4) adequacy of funding levels and funding priorities, including the cost of infrastructure and scientific studies. The recipient will provide monthly progress report and the following reports/documents will be presented as deliverables under the contract: (1) Financial and Contract Management Preliminary Report; (2) Project Scheduling Preliminary Report; (3)Project Organizational Effectiveness Preliminary Report; (4) Project Funding Levels and Funding Priorities Preliminary Report; and (5) Final Report.

  20. IT project management 30 steps to success

    CERN Document Server

    Doraiswamy, Premanand

    2011-01-01

    This pocket guide is designed to help IT project managers to succeed, and is based on the author's years of experience in IT project management. The guide's step-by-step approach will enable those new to IT project management, or intending to make a career in this field, to master the essential skills. For seasoned professionals, the pocket guide offers an invaluable concise reference guide.

  1. Hanford's 100-HX Pump and Treat Project - a Successful Blend of Science, Technology, Construction, and Project Management - 12412

    Energy Technology Data Exchange (ETDEWEB)

    Albin, Kenneth A.; Bachand, Marie T.; Biebesheimer, Fred H.; Neshem, Dean O.; Smoot, John L. [CH2M HILL Plateau Remediation Company, Richland, Washington 99352 (United States)

    2012-07-01

    CH2M Hill Plateau Remediation Company (CHPRC) recently completed construction and start-up of the $25 million 100-HX Groundwater Pump and Treat Project for the Department of Energy (DOE) at its Hanford Reservation site in Washington State. From the onset, the 100-HX Project Leadership Team was able to successfully blend the science and technology of a state-of-the-art groundwater pump and treat system with the principles, tools, and techniques of traditional industrial-type construction and project management. From the 1940's through most of the 1980's, the United States used the Hanford Site to produce nuclear material for national defense at reactor sites located along the Columbia River. While the reactors were operational, large volumes of river water were treated with sodium dichromate (to inhibit corrosion of the reactor piping) and used as a coolant for the reactors. After a single pass through the reactor and before being discharged back to the river, the coolant water was sent to unlined retention basins to cool and to allow the short-lived radioactive contaminants to decay. As a result of these operations, hexavalent chromium was introduced to the vadose zone, and ultimately into the groundwater aquifer and the adjacent Columbia River. In addition, numerous leaks and spills of concentrated sodium dichromate stock solution over the lifetime of reactor operations led to higher concentrations of chromate in the vadose zone and groundwater in localized areas. As a result, the 100 Area was included in the National Priorities List sites under the Comprehensive Environmental Response Compensation and Liability Act of 1980 (CERCLA). The mission of the 100-HX Project is to significantly reduce the concentration of hexavalent chromium in the groundwater by treating up to 3.8 billion gallons (14,300 mega-liters) of contaminated water over its first nine years of operations. In order to accomplish this mission, groundwater scientists and geologists using

  2. Final Status Survey for the Largest Decommissioning Project on Earth

    International Nuclear Information System (INIS)

    Dubiel, R.W.; Miller, J.; Quayle, D.

    2006-01-01

    To assist the United States Department of Energy's (US DOE's) re-industrialization efforts at its gaseous diffusion site in Oak Ridge, Tennessee, known as the East Tennessee Technology Park (ETTP), the US DOE awarded a 6-year Decontamination and Decommissioning (D and D) contract to BNG America (formerly BNFL Inc.) in 1997. The ETTP 3-Building D and D Project included the removal and disposition of the materials and equipment from the K-33, K-31, and K-29 Gaseous Diffusion Plant buildings. The three buildings comprise more than 4.8 million square feet (446,000 square meters) of floor surface area and more than 350 million pounds (148 million kilograms) of hazardous and radioactively contaminated material, making it the largest nuclear D and D project in progress anywhere in the world. The logistical hurdles involved in a project of this scope and magnitude required an extensive amount of Engineering and Health Physics professionals. In order to accomplish the Final Status Survey (FSS) for a project of this scope, the speed and efficiency of automated survey equipment was essential. Surveys of floors, structural steel and ceilings up to 60 feet (18 meters) were required. The FSS had to be expanded to include additional remediation and surveys due to characterization surveys and assumptions regarding the nature and extent of contamination provided by the US DOE. Survey design and technical bases had to consider highly variable constituents; including uranium from depleted to low enrichment, variable levels of Technetium-99 and transuranic nuclides, which were introduced into the cascade during the 1960's when recycled uranium (RU) from Savannah River was re-enriched at the facility. The RU was transported to unexpected locations from leaks in the cascade by complex building ventilation patterns. The primary survey tool used for the post remediation and FSS was the Surface Contamination Monitor (SCM) and the associated Survey Information Management System (SIMS

  3. Case history of a successful CO{sub 2} miscible gas WAG injection project

    Energy Technology Data Exchange (ETDEWEB)

    Harpole, Ken

    1998-07-01

    A successful fieldwide CO{sub 2} miscible gas injection project has been underway at the East Vacuum Grayburg San Andres Unit (EVGSAU) in eastern New Mexico, USA since 1985. This presentation follows the evolution of CO{sub 2} miscible gas WAG injection operations at EVGSAU and discusses some of the significant changes in reservoir strategy management which have been implemented over the past 13 years. These changes parallel the evolution in the industry's understanding of and experience with CO{sub 2} miscible gs injection processes. The operating problems and reservoir management challenges encountered at East Vacuum - injection performance, sweep efficiency, effective management of WAG operations, rapidly changing requirements for handling produced gas, and maintaining efficient utilization of injected CO{sub 2} - reflect the kinds of challenges typically encountered in managing a large CO{sub 2} injection project. 1 fig., 1 tab.

  4. Synopsis of Past Stimulation Methods in Enhanced (Engineered) Geothermal Systems, Boreholes, and Existing Hydrothermal Systems with Success Analysis and Recommendations for Future Projects

    Science.gov (United States)

    Broadhurst, T.; Mattson, E.

    2017-12-01

    Enhanced geothermal systems (EGS) are gaining in popularity as a technology that can be used to increase areas for geothermal resource procurement. One of the most important factors in the success of an EGS system is the success of the subsurface reservoir that is used for fluid flow and heat mining through advection. There are numerous challenges in stimulating a successful reservoir, including maintaining flow rates, minimizing leak off, preventing short-circuiting, and reducing the risk of microseismicity associated with subsurface activity. Understanding past examples of stimulation can be invaluable in addressing these challenges. This study provides an overview of stimulation methods that have been employed in EGS systems from 1974-2017. We include all geothermal reservoirs and demonstration projects that have experienced hydrofracturing, chemical stimulation, and induced thermal stress for a comprehensive list. We also examine different metrics and measures of success in geothermal reservoir stimulation to draw conclusions and provide recommendations for future projects. Multiple project characteristics are reported including geologic setting, stress conditions, reservoir temperature, injection specifics, resulting microseismicity, and overall project goals. Insight into optimal and unproductive stimulation methods is crucial to conserving mental capital, utilizing project funding, and ensuring EGS technology advances as efficiently as possible.

  5. Memorandum of understanding for the TWRS characterization retrieval project

    International Nuclear Information System (INIS)

    JO, J.

    1999-01-01

    During fiscal year 1999, various programs and projects will require analyses from the 222-S Laboratory. In order to prioritize and successfully meet the analytical demands of all the customers, multiple organizations across the Tank Waste Remediation System (TWRS) must work together. One of the projects that will require analyses from the 222-S Laboratory is the retrieval project. Successful completion of retrieval project objectives requires cooperation among four TWRS organizations. The requirements and expectations regarding retrieval project analytical work were examined in order to define roles and responsibilities for each of these TWRS organizations. This memorandum of understanding (MOU) documents the results of this review and establishes the roles and responsibilities. This MOU is subdivided into three sections, the first of which is this introduction. Section 2 provides a summary of the overall roles and responsibilities with respect to retrieval project analytical work for the four TWRS organizations involved. The final section describes the individual interfaces involved in performing retrieval project analytical work, and discusses the roles and responsibilities with respect to each individual interface

  6. Hispanic Vocational Exploration Project. Final Report.

    Science.gov (United States)

    Centro De La Comunidad, Inc., New London, CT.

    During its second year, the Hispanic Vocational Exploration Project recruited eighth and ninth grade Hispanic youth for a four-week cycle, after-school, career exploratory program at Southeastern Regional Vocational Technical School, Groton, Connecticut. A series of career education workshops was the other major project activity. Supportive…

  7. Successes and challenges of north-south partnerships - key lessons from the African/Asian Regional Capacity Development projects.

    Science.gov (United States)

    Färnman, Rosanna; Diwan, Vishal; Zwarenstein, Merrick; Atkins, Salla

    2016-01-01

    Increasing efforts are being made globally on capacity building. North-south research partnerships have contributed significantly to enhancing the research capacity in low- and middle-income countries (LMICs) over the past few decades; however, a lack of skilled researchers to inform health policy development persists, particularly in LMICs. The EU FP7 funded African/Asian Regional Capacity Development (ARCADE) projects were multi-partner consortia aimed to develop a new generation of highly trained researchers from universities across the globe, focusing on global health-related subjects: health systems and services research and research on social determinants of health. This article aims to outline the successes, challenges and lessons learned from the life course of the projects, focusing on the key outputs and experiences of developing and implementing these two projects together with sub-Saharan African, Asian and European institution partners. Sixteen participants from 12 partner institutions were interviewed. The data were analysed using thematic content analysis, which resulted in four themes and three sub-categories. These data were complemented by a review of project reports. The results indicated that the ARCADE projects have been successful in developing and delivering courses, and have reached over 920 postgraduate students. Some partners thought the north-south and south-south partnerships that evolved during the project were the main achievement. However, others found there to be a 'north-south divide' in certain aspects. Challenges included technical constraints and quality assurance. Additionally, adapting new teaching and learning methods into current university systems was challenging, combined with not being able to award students with credits for their degrees. The ARCADE projects were introduced as an innovative and ambitious project idea, although not designed appropriately for all partner institutions. Some challenges were underestimated

  8. Chosen aspects of innovative projects management

    Directory of Open Access Journals (Sweden)

    J. Gawlik

    2010-07-01

    Full Text Available Any company willing to maintain its market position has to search and implement innovative products and services. Integrated development ofenterprise’s innovative activity requests a constant search for new technologies and new organizational forms. Ability of effectivemanagement of innovative projects becomes a crucial issue. The paper presents a characteristic of innovative projects accordingly toOECD standards. Project management concepts based on Project Management Institute (PMI and International Project ManagementAssociation (IPMA procedures have been discussed. Key success factors have been defined, i.e.: obtaining assumed project outcome (range, project implementation conform to planned schedule (deadline, maintaining project costs under a certain limit (budget, quality (are the customers satisfied?, resources (team losses and interpersonal relations. Tables comparing product innovativeness with fields of requested know – how for particular product innovativeness levels have been elaborated. Finally, SCRUM method of adaptive project management aiming at providing possibly optimal outcome has been described.

  9. Radiological and environmental consequences. Final report of the Nordic Nuclear Safety Research project BOK-2

    International Nuclear Information System (INIS)

    Palsson, S.E.

    2002-11-01

    Final report of the Nordic Nuclear Safety Research project BOK-2, Radiological and Environmental Consequences. The project was carried out 1998-2001 with participants from all the Nordic countries. Representatives from the Baltic States were also invited to some of the meetings and seminars. The project consisted of work on terrestrial and marine radioecology and had a broad scope in order to enable participation of research groups with various fields of interest. This report focuses on the project itself and gives a general summary of the studies undertaken. A separate technical report summarises the work done by each research group and gives references to papers published in scientific journals. The topics in BOK-2 included improving assessment of old and recent fallout, use of radionuclides as tracers in Nordic marine areas, improving assessment of internal doses and use of mass spectrometry in radioecology. (au)

  10. The ICE-CREAM Project : final report

    NARCIS (Netherlands)

    Janse, M.D.

    2004-01-01

    The ICE-CREAM project has been investigating how to make compelling experiences for end-users based on enabling technologies for interactive media, such as DVB-MHP, Internet and MPEG-4. The goals of the project were to extend the notion of interaction, to exploit domestic activities and familiar

  11. Project Guarantee 1985. Final repository for high-level radioactive wastes: The system of safety barriers

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    Final disposal of radioactive waste involves preventing the waste from returning from the repository location into the biosphere by means of successively arranged containment measures known as safety barriers. In the present volume NGB 85-04 of the series of reports for Project 'Guarantee' 1985, the safety barrier system for the type C repository for high-level waste is described. The barrier parameters which are relevant for safety analysis are quantified and associated error limits and data scatter are given. The aim of the report is to give a summary documentation of the safety analysis input data and their scientific background. For secure containment of radioactive waste safety barriers are used which effectively limit the release of radioactive material from the repository (release barriers) and effectively retard the entry of the original radioactive material into the biosphere (time barriers). Safety barriers take the form of both technically constructed containment measures and the siting of the repository in suitable geological formations. The technical safety barrier system in the case of high-level waste comprises: the waste solidification matrix (borosilicate glass), massive steel canisters, encasement of the waste canisters, encasement of the waste canisters in highly compacted bentonite, sealing of vacant storage space and access routes on repository closure. The natural geological safety barriers - the host rock and overlying formations provide sufficiently long deep groundwater flow times from the repository location to the earth's surface and for additional lengthening of radionuclide migration times by means of various chemical and physical retardation mechanisms. The stability of the geological formations is so great that hydrogeological system is protected for a sufficient length of time from deterioration caused, in particular, by erosion. Observations in the final section of the report indicate that input data for the type C repository safety

  12. The final focus test beam project

    International Nuclear Information System (INIS)

    Burke, D.

    1991-05-01

    An overview is given of the Final Focus Test Beam (FFTB) that is being constructed as a prototype final focus system for a future electron-positron linear collider. This beam line will use as input the 50 GeV electron beam from the SLC linac, and is designed to reduce the transverse dimensions of the beam spot at the focal point to 1 μm. 5 refs., 2 figs., 1 tab

  13. Joint-research project. The world of renewable energies: powerado. Final report. Part 2; Verbundforschungsprojekt. Erlebniswelt erneuerbare Energien: powerado. Endbericht. Bd. 2

    Energy Technology Data Exchange (ETDEWEB)

    Scharp, Michael (ed.)

    2009-02-15

    The objective of the research project 'The world of renewable energies: Powerado' was to improve communication aimed at conveying renewable energies to children. In order to achieve his aim, materials for different age groups and multipliers have been developed. These helped determining successful strategies for communicating renewable energies. There were several reasons for the need of such a project. It may be the case that renewable energies have been included into the syllabus of primary schools, but they still have no prominent role at schools. Additionally, the training of multipliers for renewable energies shows severe deficits. The project consisted of ten interconnected modules which explicitly are described. Overall, the powerado project was a huge success. 58,000 estimated multipliers, children, adolescents and persons generally being interested in renewable energies have been reached by the project and its modules. So the powerado project achieved its main objective improving communication of renewable energies.

  14. Privatization Financing Alternatives: Blending Private Capital and Public Resources for a Successful Project

    Energy Technology Data Exchange (ETDEWEB)

    BT Oakley; JH Holbrook; L Scully; MR Weimar; PK Kearns; R DiPrinzio

    1998-10-19

    The U.S. Department of Energy (DOE) launched the Contract Reform Initiative in 1994 in order to improve the effectiveness and effkiency of managing major projects and programs. The intent of this initiative is to help DOE harness both technical and market forces to reduce the overall cost of accomplishing DOE's program goals. The new approach transfers greater risk to private contractors in order to develop incentives that align contractor performance with DOE's objectives. In some cases, this goal can be achieved through public-private partnerships wherein the govermhent and the contractor share risks associated with a project in a way that optimizes its economics. Generally, this requires that project risks are allocated to the party best equipped to manage and/or underwrite them. While the merits of privatization are well documented, the question of how privatized services should be financed is often debated. Given the cost of private sector equity and debt, it is difficult to ignore the lure of the government's "risk free" cost of capital. However, the source of financing for a project is an integral part of its overall risk allocation, and therefore, participation by the government as a financing source could alter the allocation of risks in the project, diminishing the incentive structure. Since the government's participation in the project's financing often can be a requirement for financial feasibility, the dilemma of structuring a role for the government without undermining the success of the project is a common and difficult challenge faced by policymakers around the world. However, before reverting to a traditional procurement approach where the government enters into a cost-plus risk profile, the government should exhaust all options that keep the private entity at risk for important aspects of the project. Government participation in a project can include a broad range of options and can be applied with precision to bridge a

  15. Project Elderly. Interim and Final Reports.

    Science.gov (United States)

    Miami-Dade Community Coll., FL.

    This report examines Project Elderly, a project developed to provide job possibilities for the older adult in the labor market in metropolitan Miami (FL). A survey questionnaire was developed to (1) assess the opportunities of the elderly for re-entry into volunteer and paid employment positions; (2) determine the extent of the senior population…

  16. Application of Delphi expert panel in joint venture projects

    Science.gov (United States)

    Adnan, H.; Rosman, M. R.; Rashid, Z. Z. Ahmad; Mohamad Yusuwan, N.; Bakhary, N. A.

    2018-02-01

    This study was conducted with the aim to identify the application of the Delphi Technique in validating findings obtained from questionnaire surveys and interviews done in- depth on the subject of joint venture projects in Malaysia. The Delphi technique aims to achieve a consensus of opinion amongst expert panellist that were selected on the primary factors in JV projects. To achieve research objectives, a progressive series of questions was designed where a selected panel of expert to confirm and validate the final findings. The rationale, benefits, limitations and recommendations for the use of Delphi were given in this study. From the literature review done, twenty-one factors were identified as critical factors to the making any joint venture project successful. Detail information from contractors were obtained by using the questionnaire survey method and forty-three in-depth interviews were carried out. Trust between partners, mutual understanding, partner selection criteria, agreement of contract, objective compatibility, conflict, and commitment were confirmed by the Delphi panel to be the critical success factors besides another fourteen factors which were found to be the Failure Reduction Criteria. Delphi techniques has proven to successfully assist in recognising the main factors and would be beneficial in supplementing the success of joint venture arrangements application for construction projects in Malaysia.

  17. ND-REAP/DOE cooperative project: final report

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    The impacts of energy-related developments in North Dakota are having profound effects on the state. Among the most significant of these effects are those on the state's economy and its population. Knowledge of the total environmental effects of development is a necessary prerequisite for effective planning and decision making. This final report addresses the conceptual design and functional evolution of the Regional Environmental Assessment Program, the results of the REAP/DOE Cooperative Effort, as well as evolution of the REAP/DOE effort and recommendations for future directions. The Economic Demographic (E-D) Model was developed to give North Dakota decision makers a tool with which to evaluate the impacts of coal development. It projects social, economic, and characteristics of North Dakota. Refinements and expansion of the model are discussed in Section 1. Section 2 provides an evaluation of the model as applied to other states. Section 3 identifies and evaluates the use of REAP data and capabilities to date. The REAP Resources Reference System R/sup 3/S was developed to provide access to information systems and to past research and present studies about aspects of North Dakota. It is a computer-based library reference system. Its status and expansion potential is covered in Section 4. Section 5 makes recommendations for future efforts.

  18. Project Final Report: HPC-Colony II

    Energy Technology Data Exchange (ETDEWEB)

    Jones, Terry R [ORNL; Kale, Laxmikant V [University of Illinois, Urbana-Champaign; Moreira, Jose [IBM T. J. Watson Research Center

    2013-11-01

    This report recounts the HPC Colony II Project which was a computer science effort funded by DOE's Advanced Scientific Computing Research office. The project included researchers from ORNL, IBM, and the University of Illinois at Urbana-Champaign. The topic of the effort was adaptive system software for extreme scale parallel machines. A description of findings is included.

  19. Project CAREER/CAN. Final Evaluation Report.

    Science.gov (United States)

    National Educational Evaluation Services, Inc., Chestnut Hill, MA.

    A description and evaluation of (1) the development of the 4-column process which completes the behavioral objective data base, (2) the development of the computer retrieval capability, and (3) the pilot testing of the product in high school classrooms are included in this summative evaluation of Project CAREER/CAN. (Goals of Project CAREER/CAN,…

  20. Progress of JPDR decommissioning project

    International Nuclear Information System (INIS)

    Kiyota, M.; Yanagihara, S.

    1995-01-01

    The Japan Power Demonstration Reactor (JPDR) decommissioning project is progressively achieving its final goal; the project will be finished by March 1996 to release the JPDR's site into unrestricted use in a green field condition. The new techniques which developed or improved in R and D, the first phase of this program, have been successfully applied to the actual dismantling activities. Some decommissioning wastes have been managed as the first case of onsite shallow land burial based on the new regulatory frame of radioactive waste management. The experiences and the data obtained from the JPDR dismantling activities are expected to contribute to future decommissioning of commercial nuclear power plants. (author)

  1. Designing a lessons learned model to improve the success of new product development in project oriented organizations

    Directory of Open Access Journals (Sweden)

    Ahmad

    2016-12-01

    Full Text Available Nowadays, project-based organizations need to utilize intellectual capital and knowledge to become leader in their business activities. The new approach to use knowledge based skills from one side and development of the new complicated products from the other side have increased the need for designing a lessons learned model. The purpose of this paper is to design a lessons learned model to improve the success of new product development for project oriented organizations. The study designs a questionnaire in Likert scale and distributes it among 56 experts who were well informed about various techniques of new product development and lessons learned. Cronbach alphas for all components of the survey were well above the desirable level. The results of the survey have indicated that there were positive and meaningful relationships between lessons learned components and the success of the new product development.

  2. Use of the Theoretical Domains Framework to evaluate factors driving successful implementation of the Accelerated Chest pain Risk Evaluation (ACRE) project.

    Science.gov (United States)

    Skoien, Wade; Page, Katie; Parsonage, William; Ashover, Sarah; Milburn, Tanya; Cullen, Louise

    2016-10-12

    The translation of healthcare research into practice is typically challenging and limited in effectiveness. The Theoretical Domains Framework (TDF) identifies 12 domains of behaviour determinants which can be used to understand the principles of behavioural change, a key factor influencing implementation. The Accelerated Chest pain Risk Evaluation (ACRE) project has successfully translated research into practice, by implementing an intervention to improve the assessment of low to intermediate risk patients presenting to emergency departments (EDs) with chest pain. The aims of this paper are to describe use of the TDF to determine which factors successfully influenced implementation and to describe use of the TDF as a tool to evaluate implementation efforts and which domains are most relevant to successful implementation. A 30-item questionnaire targeting clinicians was developed using the TDF as a guide. Questions encompassed ten of the domains of the TDF: Knowledge; Skills; Social/professional role and identity; Beliefs about capabilities; Optimism; Beliefs about consequences; Intentions; Memory, attention and decision processes; Environmental context and resources; and Social influences. Sixty-three of 176 stakeholders (36 %) responded to the questionnaire. Responses for all scales showed that respondents were highly favourable to all aspects of the implementation. Scales with the highest mean responses were Intentions, Knowledge, and Optimism, suggesting that initial education and awareness strategies around the ACRE project were effective. Scales with the lowest mean responses were Environmental context and resources, and Social influences, perhaps highlighting that implementation planning could have benefitted from further consideration of the factors underlying these scales. The ACRE project was successful, and therefore, a perfect case study for understanding factors which drive implementation success. The overwhelmingly positive response suggests that it

  3. NASA Human Health and Performance Center: Open innovation successes and collaborative projects

    Science.gov (United States)

    Richard, Elizabeth E.; Davis, Jeffrey R.

    2014-11-01

    In May 2007, what was then the Space Life Sciences Directorate published the 2007 Space Life Sciences Strategy for Human Space Exploration, setting the course for development and implementation of new business models and significant advances in external collaboration over the next five years. The strategy was updated on the basis of these accomplishments and reissued as the NASA Human Health and Performance Strategy in 2012, and continues to drive new approaches to innovation for the directorate. This short paper describes the successful execution of the strategy, driving organizational change through open innovation efforts and collaborative projects, including efforts of the NASA Human Health and Performance Center (NHHPC).

  4. Final report of the project performance assessment and economic evaluation of nuclear waste management

    International Nuclear Information System (INIS)

    Rasilainen, K.; Anttila, M.; Hautojaervi, A.

    1993-05-01

    The publication is the final report of project Performance Assessment and Economic Evaluation of Nuclear Waste Management (TOKA) at the Nuclear Engineering Laboratory of VTT (Technical Research Centre of Finland), forming part of the Publicly Financed Nuclear Waste Management Research Programme (JYT). The project covers safety and cost aspects of all phases of nuclear waste management. The main emphasis has been on developing an integrated system of models for performance assessment of nuclear waste repositories. During the four years the project has so far been in progress, the total amount of work has been around 14 person-years. Computer codes are the main tools in the project, they are either developed by the project team or acquired from abroad. In-house model development has been especially active in groundwater flow, near-field and migration modelling. The quantitative interpretation of Finnish tracer experiments in the laboratory and natural analogue studies at Palmottu support performance assessments via increased confidence in the migration concepts used. The performance assessment philosophy adopted by the team consists of deterministic modelling and pragmatic scenario analysis. This is supported by the long-term experience in practical performance assessment of the team, and in theoretical probabilistic modelling exercises. The radiological risks of spent fuel transportation from the Loviisa nuclear power plant to Russia have been analysed using a probabilistic computer code and Finnish traffic accident statistics. The project assists the authorities in the annual assessment of utility estimates of funding needs for future nuclear waste management operations. The models and methods used within the project are tested in international verification/validation projects

  5. Empirical testing of selected critical success factors in CRM implementation projects - A study of SMEs in the B2B sector

    OpenAIRE

    Röschmann, Kathrin; Ziyadullaeva, Muhayyo

    2011-01-01

    Purpose:The purpose of this thesis is to describe and analyze critical success factors of CRM implementation projects with a special focus on SME’s in the B2B sector.  Method: This study is based on quantitative research using survey method.  Target Audience: SMEs of B2B business, which are planning to implement a CRM system Academic audience, which is interested in CRM implementation with focus on SME.  Conclusion: There are various critical success factors in CRM implementation projects and...

  6. Information Systems Success: An empirical study on the appropriate success criteria and the real value of critical success factors

    OpenAIRE

    Skovly, Jørgen

    2013-01-01

    Success is a complex concept, that people have been trying to understand for some time. Extensive research has been conducted in order to improve our understanding, and thus increase our chances for achieving success. However, as projects still continue to fail, the real value of this research seems unclear. This thesis emphasizes the distinction between variables that may cause success (success factors), and variables that are part of success (success criteria). Success is not a 'black and w...

  7. A learning-based approach to understanding success in rural electrification : insights from micro hydro projects in Bolivia

    NARCIS (Netherlands)

    Drinkwaard, ir. W.; Kirkels, A.F.; Romijn, H.A.

    2010-01-01

    The paper analyzes the performance of a set of rural Micro Hydro Power (MHP) projects and MHP-implementing organizations in Bolivia, using a learning-based analytical perspective. Rather than identifying a generic set of critical success factors such as access to finance, adequate technological

  8. Effect of bond administration on construction project delivery

    Directory of Open Access Journals (Sweden)

    Oke Ayodeji Emmanuel

    2016-12-01

    Full Text Available Construction bond administration involves management of bond issues from inception of obtaining bond from guarantor to the point of release of contractor by the client. This process has posted a lot of challenges to construction stakeholders; it is therefore, necessary to examine the relationship between bond administration and project success. Archival data of completed bonded building projects were gathered through a pro forma developed for this purpose. Using Pearson product moment of correlation, it was revealed that the cost of securing a construction bond has a positive and significant effect on the initial and final costs of the project, while the number of days needed to secure a construction bond has no significant effect on the initial and final durations of the construction project. In order to establish the relationship between project delivery indices of cost and time and the construction bond administration variables, iteration of linear regression was adopted to arrive at the best-fit equation. Factors affecting the cost of securing construction bonds from guarantors should be identified and given adequate attention by construction stakeholders in order to minimize the effect of construction bond administration on project delivery.

  9. Advanced Flue Gas Desulfurization (AFGD) Demonstration Project, A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2001-01-01

    The AFGD process as demonstrated by Pure Air at the Bailly Station offers a reliable and cost-effective means of achieving a high degree of SO(sub 2) emissions reduction when burning high-sulfur coals. Many innovative features have been successfully incorporated in this process, and it is ready for widespread commercial use. The system uses a single-loop cocurrent scrubbing process with in-situ oxidation to produce wallboard-grade gypsum instead of wet sludge. A novel wastewater evaporation system minimizes effluents. The advanced scrubbing process uses a common absorber to serve multiple boilers, thereby saving on capital through economies of scale. Major results of the project are: (1) SO(sub 2) removal of over 94 percent was achieved over the three-year demonstration period, with a system availability exceeding 99.5 percent; (2) a large, single absorber handled the combined flue gas of boilers generating 528 MWe of power, and no spares were required; (3) direct injection of pulverized limestone into the absorber was successful; (4) Wastewater evaporation eliminated the need for liquid waste disposal; and (5) the gypsum by-product was used directly for wallboard manufacture, eliminating the need to dispose of waste sludge

  10. Innovative and adaptive technologies in decommissioning of nuclear facilities. Final report of a coordinated research project 2004-2008

    International Nuclear Information System (INIS)

    2008-10-01

    There are dozens of old reactors and other nuclear facilities worldwide that are either being actively dismantled or are candidates for decommissioning in the near term. A significant proportion of these facilities are situated in Member States or institutions that do not have adequate expertise and technologies for planning and implementing state of the art decommissioning projects. The technology selection process is critical in that regard. The main objective of the IAEA technical activities on decommissioning is to promote the exchange of lessons learned in order to improve the technologies, thereby contributing to successful planning and implementation of decommissioning. This should be achieved through a better understanding of the decision making process in technology comparison and selection and relevant issues affecting the entire decommissioning process. The specific objectives of the Coordinated Research Project (CRP) on Innovative and Adaptive Technologies in Decommissioning of Nuclear Facilities include the following general aspects: (a) To establish methodologies and data needs for developing concepts and approaches relevant to technology comparison and selection in decommissioning; (b) To improve and expand the database on applications and performance of various types of decommissioning technologies; (c) To address specific issues for individual decommissioning technologies and generate data relevant to their comparison and selection. It is also expected that this project, and in particular the papers collected in this TECDOC, will draw Member States' attention to the practicality and achievability of timely planning and implementation of decommissioning, especially for many smaller projects. Concluding reports that summarized the work undertaken under the aegis of the CRP were presented at the third and final research coordination meeting held in Rez, Czech Republic, 3-7 December 2007, and collected in this technical publication. Operating

  11. The Final Year Project (FYP) in Social Sciences: Establishment of Its Associated Competences and Evaluation Standards

    Science.gov (United States)

    Mateo, Joan; Escofet, Anna; Martinez, Francesc; Ventura, Javier; Vlachopoulos, Dimitrios

    2012-01-01

    This paper presents the fundamental characteristics of the Final Year Project (FYP), its associated competences and some evaluation standards that derived from a research conducted by the regional government of Catalonia (Spain) and the Catalan University Quality Assurance Agency. More analytically, the paper begins with the definition of the…

  12. The Norwegian Plasma Fractionation Project--a 12 year clinical and economic success story.

    Science.gov (United States)

    Flesland, O; Seghatchian, J; Solheim, B G

    2003-02-01

    The establishment of the Norwegian Fractionation Project (Project) was of major importance in preserving national self-sufficiency when plasma, cryoprecipitate and small batch factor IX-concentrates were replaced by virus inactivated products in the last part of the 1980s. Fractionation was performed abroad by contract with Octapharma after tenders on the European market. All Norwegian blood banks (>50) participated in the Project. Total yearly production was 50-60 tons of mainly recovered plasma. From 1993 solvent detergent (SD) treated plasma has replaced other plasma for transfusion. The blood banks paid for the fractionation and/or viral inactivation process, while the plasma remained the property of the blood banks and the final products were returned to the blood banks. The Project sold surplus products to other Norwegian blood banks and the majority of the coagulation factor concentrates to The Institute of Haemophilia and Rikshospitalet University Hospital. Both plasma and blood bank quality was improved by the Project. Clinical experience with the products has been satisfactory and self-sufficiency has been achieved for all major plasma proteins and SD plasma, but a surplus exceeding 3 years consumption of albumin has accumulated due to decreasing clinical use.The Project has secured high yields of the fractionated products and the net income from the produced products is NOK 1115 (140 Euros or US dollars) per litre plasma. An increasing surplus of albumin and the possibility of significant sales abroad of currently not fractionated IVIgG, could lead to a reorganisation of the Project from that of a co-ordinator to a national plasma handling unit. This unit could buy the plasma from the blood banks and have the plasma fractionated by contract after tender, before selling the products back for cost recovery. The small blood banks could produce plasma for products for the Norwegian market, while surplus products from the larger blood banks which are

  13. The ENCOAL Mild Coal Gasification Project, A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    objective, the following goals were established for the ENCOAL(reg s ign) Project: Provide sufficient quantity of products for full-scale test burns; Develop data for the design of future commercial plants; Demonstrate plant and process performance; Provide capital and O and M cost data; and Support future LFC(trademark) technology licensing efforts. Each of these goals has been met and exceeded. The plant has been in operation for nearly 5 years, during which the LFC(trademark) process has been demonstrated and refined. Fuels were made, successfully burned, and a commercial-scale plant is now under contract for design and construction

  14. A successful integrated project.

    Science.gov (United States)

    Zheng, P

    1994-10-01

    The experiences of the Juxian County Family Planning Committee of Shandong Province, China, were discussed in terms of the integration of family planning with income generation activities in rural areas. The integrated program was initiated in 1988 with pilot programs established by the Qiaoshan Family Planning Association to develop marketable skills in carpet weaving and grass braiding in Xiazhuang Town and Qiaoshan Township. The program gave priority of admission to women with only children and those who practiced family planning. 1400 women were recruited in these factories. Other income generation programs were developed for silkworm breeding and silk reeling, woolen embroidery, and printing. High ranking officials of the China Family Planning Association commended the work in income generation and family planning in Juxian County. This recognition spurred the second phase of development by the county family planning association: the establishment of village operated factories and mills for native products. By the end of 1991, there were 26 such projects in the county and per capita income to women increased by RMB 678 yuan. In the third stage of 1992, the number of association enterprises increased to 196 with recruitment of over 18,000 reproductive age women. The programs were initiated with collective funds from farmers and villages. The 170 projects in 1992 were developed with an investment of 9.6 million yuan, of which 2.26 million yuan was from individuals (23.5%). Emphasis was placed on self-reliance and recruitment of women with one child, women with 2 daughters and tubal ligations, and family planning motivators. The consequences of the integrated program were weakening traditional customs of marriage and childbearing, improvement in socioeconomic status of women, and effective service delivery of family planning and maternal and child health care services.

  15. Successes and challenges of north–south partnerships – key lessons from the African/Asian Regional Capacity Development projects

    Science.gov (United States)

    Färnman, Rosanna; Diwan, Vishal; Zwarenstein, Merrick; Atkins, Salla

    2016-01-01

    Introduction Increasing efforts are being made globally on capacity building. North–south research partnerships have contributed significantly to enhancing the research capacity in low- and middle-income countries (LMICs) over the past few decades; however, a lack of skilled researchers to inform health policy development persists, particularly in LMICs. The EU FP7 funded African/Asian Regional Capacity Development (ARCADE) projects were multi-partner consortia aimed to develop a new generation of highly trained researchers from universities across the globe, focusing on global health-related subjects: health systems and services research and research on social determinants of health. This article aims to outline the successes, challenges and lessons learned from the life course of the projects, focusing on the key outputs and experiences of developing and implementing these two projects together with sub-Saharan African, Asian and European institution partners. Design Sixteen participants from 12 partner institutions were interviewed. The data were analysed using thematic content analysis, which resulted in four themes and three sub-categories. These data were complemented by a review of project reports. Results The results indicated that the ARCADE projects have been successful in developing and delivering courses, and have reached over 920 postgraduate students. Some partners thought the north–south and south–south partnerships that evolved during the project were the main achievement. However, others found there to be a ‘north–south divide’ in certain aspects. Challenges included technical constraints and quality assurance. Additionally, adapting new teaching and learning methods into current university systems was challenging, combined with not being able to award students with credits for their degrees. Conclusion The ARCADE projects were introduced as an innovative and ambitious project idea, although not designed appropriately for all partner

  16. Successes and challenges of north–south partnerships – key lessons from the African/Asian Regional Capacity Development projects

    Directory of Open Access Journals (Sweden)

    Rosanna Färnman

    2016-10-01

    Full Text Available Introduction: Increasing efforts are being made globally on capacity building. North–south research partnerships have contributed significantly to enhancing the research capacity in low- and middle-income countries (LMICs over the past few decades; however, a lack of skilled researchers to inform health policy development persists, particularly in LMICs. The EU FP7 funded African/Asian Regional Capacity Development (ARCADE projects were multi-partner consortia aimed to develop a new generation of highly trained researchers from universities across the globe, focusing on global health-related subjects: health systems and services research and research on social determinants of health. This article aims to outline the successes, challenges and lessons learned from the life course of the projects, focusing on the key outputs and experiences of developing and implementing these two projects together with sub-Saharan African, Asian and European institution partners. Design: Sixteen participants from 12 partner institutions were interviewed. The data were analysed using thematic content analysis, which resulted in four themes and three sub-categories. These data were complemented by a review of project reports. Results: The results indicated that the ARCADE projects have been successful in developing and delivering courses, and have reached over 920 postgraduate students. Some partners thought the north–south and south–south partnerships that evolved during the project were the main achievement. However, others found there to be a ‘north–south divide’ in certain aspects. Challenges included technical constraints and quality assurance. Additionally, adapting new teaching and learning methods into current university systems was challenging, combined with not being able to award students with credits for their degrees. Conclusion: The ARCADE projects were introduced as an innovative and ambitious project idea, although not designed

  17. Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems.

  18. THE PLANNING OF A CUSTOMER RELATIONSHIP MANAGEMENT PROJECT: REQUIREMENTS AND OPPORTUNITIES

    Directory of Open Access Journals (Sweden)

    Adriana OLARU

    2007-01-01

    Full Text Available After a brief presentation of the aspects regarding the planning of a customer relationship management (CRM project, we emphasize the factors that assure the success of such an approach. In order to obtain the attended results, an organization needs the best selection of the project manager and the most efficient teamwork, which implies employees from the company’s departments and also IT specialists. In the final part, we made appreciations concerning the efficiency of a CRM project and the opportunities created by its implementation.

  19. Project stakeholder management

    CERN Document Server

    Eskerod, Pernille

    2013-01-01

    Carrying out a project as planned is not a guarantee for success. Projects may fail because project management does not take the requirements, wishes and concerns of stakeholders sufficiently into account. Projects can only be successful though contributions from stakeholders. And in the end, it is the stakeholders that evaluate whether they find that the project is a success. To manage stakeholders effectively, you need to know your stakeholders, their behaviours and attitudes towards the project. In Project Stakeholder Management, the authors give guidance on how to adopt an analytical and s

  20. Novalignin project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Stigsson, Lars [KIRAM AB, Saltsjoebaden (Sweden)

    2002-02-01

    The NovaFiber process is a new and sustainable technology for manufacturing of chemical pulp incorporating an efficient route for recovery of energy and pulping chemicals. The process is substantially sulphur chemicals free and this creates a great potential for recovery of sulphur free lignin for internal use as a fuel or export from the mill. The NovaLignin project has been launched to evaluate this potential from a technical and economical perspective. The NovaLignin research and development effort has been partly financed by NUTEK, Energimyndigheten and Mistra. A major feature of the new lignin is the absence of organically bound sulphur compounds in the material increasing the scope of potential uses for the lignin as a precursor for fine chemicals preparation or as a sulphur free biomass based fuel. Two major forest industry laboratories in Scandinavia have conducted the laboratory cooking and lignin extraction work in the present project. The lignin extracted from the NovaFiber process, NovaLignin, has been characterised and evaluated for use in different applications. The consequences of lignin extraction in different mill configurations with a recovery boiler or a black liquor gasification system for chemicals recovery is outlined below. The NovaFiber pulp mill is compared to a reference mill based on conventional kraft pulping on the same wood raw material. The mill capacity is 2000 t/d bleached softwood pulp. The lime kiln is fired with bark and the remaining falling bark is sold, or if there is a deficit, more bark is purchased. Initial laboratory studies conducted at ATO-DLO, the Netherlands, clearly show a great potential for NovaLignin as a functional additive in thermoplastics. NovaFiber and Kraft lignin act as an UV stabiliser for polyethylene at a comparable level as an expensive commercial stabiliser, such as HALS. This means that NovaFiber lignin has a very good price/performance ratio. Experiments show that NovaFiber lignin has good potential

  1. Project Administration Techniques for Successful Classroom Collaborative Writing.

    Science.gov (United States)

    Kryder, LeeAnne Giannone

    1991-01-01

    Focuses on the collaborative writing done for a large report or proposal over a period of several weeks or months in a business writing course. Discusses short-term writing projects and nonwriting tasks for project administration, meeting management, student/instructor conference, project planning and time estimates, and oral presentations. (PRA)

  2. Domains associated with successful quality improvement in healthcare - a nationwide case study.

    Science.gov (United States)

    Brandrud, Aleidis Skard; Nyen, Bjørnar; Hjortdahl, Per; Sandvik, Leiv; Helljesen Haldorsen, Gro Sævil; Bergli, Maria; Nelson, Eugene C; Bretthauer, Michael

    2017-09-13

    There is a distinct difference between what we know and what we do in healthcare: a gap that is impairing the quality of the care and increasing the costs. Quality improvement efforts have been made worldwide by learning collaboratives, based on recognized continual improvement theory with limited scientific evidence. The present study of 132 quality improvement projects in Norway explores the conditions for improvement from the perspectives of the frontline healthcare professionals, and evaluates the effectiveness of the continual improvement method. An instrument with 25 questions was developed on prior focus group interviews with improvement project members who identified features that may promote or inhibit improvement. The questionnaire was sent to 189 improvement projects initiated by the Norwegian Medical Association, and responded by 70% (132) of the improvement teams. A sub study of their final reports by a validated instrument, made us able to identify the successful projects and compare their assessments with the assessments of the other projects. A factor analysis with Varimax rotation of the 25 questions identified five domains. A multivariate regression analysis was used to evaluate the association with successful quality improvements. Two of the five domains were associated with success: Measurement and Guidance (p = 0.011), and Professional environment (p = 0.015). The organizational leadership domain was not associated with successful quality improvements (p = 0.26). Our findings suggest that quality improvement projects with good guidance and focus on measurement for improvement have increased likelihood of success. The variables in these two domains are aligned with improvement theory and confirm the effectiveness of the continual improvement method provided by the learning collaborative. High performing professional environments successfully engaged in patient-centered quality improvement if they had access to: (a) knowledge of best

  3. AIMES Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Katz, Daniel S [Univ. of Illinois, Urbana-Champaign, IL (United States). National Center for Supercomputing Applications (NCSA); Jha, Shantenu [Rutgers Univ., New Brunswick, NJ (United States); Weissman, Jon [Univ. of Minnesota, Minneapolis, MN (United States); Turilli, Matteo [Rutgers Univ., New Brunswick, NJ (United States)

    2017-01-31

    This is the final technical report for the AIMES project. Many important advances in science and engineering are due to large-scale distributed computing. Notwithstanding this reliance, we are still learning how to design and deploy large-scale production Distributed Computing Infrastructures (DCI). This is evidenced by missing design principles for DCI, and an absence of generally acceptable and usable distributed computing abstractions. The AIMES project was conceived against this backdrop, following on the heels of a comprehensive survey of scientific distributed applications. AIMES laid the foundations to address the tripartite challenge of dynamic resource management, integrating information, and portable and interoperable distributed applications. Four abstractions were defined and implemented: skeleton, resource bundle, pilot, and execution strategy. The four abstractions were implemented into software modules and then aggregated into the AIMES middleware. This middleware successfully integrates information across the application layer (skeletons) and resource layer (Bundles), derives a suitable execution strategy for the given skeleton and enacts its execution by means of pilots on one or more resources, depending on the application requirements, and resource availabilities and capabilities.

  4. YALIN ALTI SİGMA PROJELERİ İÇİN KRİTİK BAŞARI FAKTÖRLERİ (SUCCESS FACTORS FOR LEAN SIX SIGMA PROJECTS

    Directory of Open Access Journals (Sweden)

    Ali Rıza FİRUZAN

    2012-10-01

    Full Text Available Nowadays many companies focus on various kinds of quality improvement techniques to carry the service quality beyond costumer expectations. The selected quality technique should be appropriate to the company's culture and should be sufficient for carry out targeted improvement; this will enhance the company’s superiority in market place.For this purpose, Lean Six Sigma methods are one of the important methods being used today as an intensive use of statistical tools and techniques. Lean Six Sigma methods can be implemented in almost all sectors and successful gains can be obtained. Lean Six Sigma has wide range application in the world. Most applications are successful, while some of them are failed. In this study, reasons for unsuccessful Lean Six Sigma projects are examined. The way to convert unsuccessful project into successful project are suggested. Some solutions are carried out for this purpose.

  5. TWTF project criticality task force final review and assessment

    International Nuclear Information System (INIS)

    McKinley, K.B.; Cannon, J.W.; Wheeler, F.J.; Worle, H.A.

    1980-11-01

    The Transuranic Waste Treatment Facility (TWTF) is being developed to process transuranic waste, stored and buried at the Idaho National Engineering Laboratory, into a chemically inert, physically stable basalt-like residue acceptable at a federal repository. A task force was assembled by the TWTF Project Division to review and assess all aspects of criticality safety for the TWTF. This document presents the final review, assessments, and recommendations of this task force. The following conclusions were made: Additional criticality studies are needed for the entire envelope of feed compositions and temperature effects. Safe operating k/sub eff/'s need to be determined for process components. Criticality analyses validation experiments may also be required. SRP neutron interrogation should be replaced by DDT neutron interrogation. Accuracy studies need to be performed for the proposed assaying techniques. Time-correlated neutron monitoring needs to be mocked up for process components to prove feasibility and determine accuracy. The criticality control techniques developed for the TWTF conceptual design are in compliance with ERDAM 0530, including the Double Contingency Rule. Detailed procedures and controls need to be developed

  6. Final report: A Broad Research Project in the Sciences of Complexity

    Energy Technology Data Exchange (ETDEWEB)

    None

    2000-02-01

    Previous DOE support for ''A Broad Research Program in the Sciences of Complexity'' permitted the Santa Fe Institute to initiate new collaborative research within its Integrative Core activities as well as to host visitors to participate in research on specific topics that serve as motivation and testing-ground for the study of general principles of complex systems. The critical aspect of this support is its effectiveness in seeding new areas of research. Indeed, this Integrative Core has been the birthplace of dozens of projects that later became more specifically focused and then won direct grant support independent of the core grants. But at early stages most of this multidisciplinary research was unable to win grant support as individual projects--both because it did not match well with existing grant program guidelines, and because the amount of handing needed was often too modest to justify a formal proposal to an agency. In fact, one of the attributes of core support has been that it permitted SFI to encourage high-risk activities because the cost was quite low. What is significant is how many of those initial efforts have been productive in the SFI environment. Many of SFI'S current research foci began with a short visit from a researcher new to the SFI community, or as small working groups that brought together carefully selected experts from a variety of fields. As mentioned above, many of the ensuing research projects are now being supported by other funding agencies or private foundations. Some of these successes are described.

  7. Citizen science participation in research in the environmental sciences: key factors related to projects' success and longevity.

    Science.gov (United States)

    Cunha, Davi G F; Marques, Jonatas F; Resende, Juliana C DE; Falco, Patrícia B DE; Souza, Chrislaine M DE; Loiselle, Steven A

    2017-01-01

    The potential impacts of citizen science initiatives are increasing across the globe, albeit in an imbalanced manner. In general, there is a strong element of trial and error in most projects, and the comparison of best practices and project structure between different initiatives remains difficult. In Brazil, the participation of volunteers in environmental research is limited. Identifying the factors related to citizen science projects' success and longevity within a global perspective can contribute for consolidating such practices in the country. In this study, we explore past and present projects, including a case study in Brazil, to identify the spatial and temporal trends of citizen science programs as well as their best practices and challenges. We performed a bibliographic search using Google Scholar and considered results from 2005-2014. Although these results are subjective due to the Google Scholar's algorithm and ranking criteria, we highlighted factors to compare projects across geographical and disciplinary areas and identified key matches between project proponents and participants, project goals and local priorities, participant profiles and engagement, scientific methods and funding. This approach is a useful starting point for future citizen science projects, allowing for a systematic analysis of potential inconsistencies and shortcomings in this emerging field.

  8. Success Factors in Wind Power Projects; Factores de Exito en Proyectos de Energia Eolica

    Energy Technology Data Exchange (ETDEWEB)

    Cabal Cuesta, H; Varela Conde, M; Lago Rodriguez, C; Saez Angulo, R M

    2002-07-01

    The Spanish wind energy market has experienced an average annual increase over 60% in recent years. With more than 4.1 GW of power at the end of 2002, this market has became the second in Europe and the third the world. With the objective of obtaining the origin of this success,an analysis of technical and economic features of selected wind projects has been undertaken to draw the outstanding factors that any new independent promoter/developer should take into account within this market. (Author) 16 refs.

  9. Final workshop proceedings of the collaborative project ''Crystalline ROCK retention processes''

    Energy Technology Data Exchange (ETDEWEB)

    Rabung, Thomas; Garcia, David; Montoya Vanessa; Molinero, Jorge (eds.)

    2014-07-01

    The present document is the proceedings of the Final Workshop of the EURATOM FP7 Collaborative Project CROCK (Crystalline Rock Retention Processes). The key driver for initiation the CP CROCK, identified by national Waste Management Organizations, is the undesired high uncertainty and the associated conservatism with respect to the radionuclide transport in the crystalline host-rock far-field around geological disposal of high-level radioactive wastes.

  10. CERTS Microgrid Laboratory Test Bed - PIER Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph H.; Eto, Joseph H.; Lasseter, Robert; Schenkman, Ben; Klapp, Dave; Linton, Ed; Hurtado, Hector; Roy, Jean; Lewis, Nancy Jo; Stevens, John; Volkommer, Harry

    2008-07-25

    The objective of the CERTS Microgrid Laboratory Test Bed project was to enhance the ease of integrating small energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of small generating sources. The techniques comprising the CERTS Microgrid concept are: 1) a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation; 2) an approach to electrical protection within the microgrid that does not depend on high fault currents; and 3) a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications. The techniques were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations, and finally through factory acceptance testing of individual microgrid components. The islanding and resychronization method met all Institute of Electrical and Electronics Engineers 1547 and power quality requirements. The electrical protections system was able to distinguish between normal and faulted operation. The controls were found to be robust and under all conditions, including difficult motor starts. The results from these test are expected to lead to additional testing of enhancements to the basic techniques at the test bed to improve the business case for microgrid technologies, as well to field demonstrations involving microgrids that involve one or mroe of the CERTS Microgrid concepts.

  11. Wyoming coal-conversion project. Final technical report, November 1980-February 1982. [Proposed WyCoalGas project, Converse County, Wyoming; contains list of appendices with title and identification

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    This final technical report describes what WyCoalGas, Inc. and its subcontractors accomplished in resolving issues related to the resource, technology, economic, environmental, socioeconomic, and governmental requirements affecting a project located near Douglas, Wyoming for producing 150 Billion Btu per day by gasifying sub-bituminous coal. The report summarizes the results of the work on each task and includes the deliverables that WyCoalGas, Inc. and the subcontractors prepared. The co-venturers withdrew from the project for two reasons: federal financial assistance to the project was seen to be highly uncertain; and funds were being expended at an unacceptably high rate.

  12. Alligator Rivers Analogue Project. Final Report - Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Duerden, P [Australian Nuclear Science and Technology Organisation (ANSTO), Lucas Heights, NSW (Australia); Lever, D A [AEA Technology, Harwell (United Kingdom); Sverjensky, D A [Johns Hopkins Univ., Baltimore, MD (United States); Townley, L R [Commonwealth Scientific and Industrial Research Organisation (CSIRO), Wembley, WA (Australia). Div. of Water Resources

    1992-07-01

    This summary report, which highlights the work and findings of the Alligator Rivers Analogue Project (ARAP) is one of a series of 16 volumes, listed below. Detailed descriptions and results are provided in Volumes 2 to 16. Full acknowledgment to individual contributions is provided in the individual reports, and in Appendix I of this report. The findings from the technical studies are discussed in the context of assessments of the long-term performance of geological repositories for radioactive wastes, which are being undertaken in many countries. They are also considered in an integrated 'Scenario Development' approach, aimed to understand the formation of the ore deposit. Despite their inherent uncertainties, the findings provide a basis for assessing the way in which radionuclides will migrate in environments with a variety of geologic settings and over a range of different geologic timescales. Thus, section 2 of this report discusses the concept of using uranium deposits as natural analogues and refers to a number of such studies, including those at the Koongarra deposit in the Alligator Rivers Region of the Northern Territory of Australia. Section 3 reviews early scientific work in the Alligator Rivers Region and summarises the results of the analogue studies undertaken between 1981 and 1987 that were funded by the US Nuclear Regulatory Commission (USNRC) and the UK Department of the Environment (UKDoE). Section 4 describes the objectives of ARAP and the manner in which the study was conducted and provides a general outline of the project and a summary of the findings. A general description of the Koongarra ore deposit, the focus of ARAP, is provided in Section 5, with Sections 6-13 providing summaries of the work carried out to characterise the site in detail and provide data for modelling. Sections 14-18 discuss how this data was used in modelling and how the results may be applied for performance assessment studies. Finally, Section 19 considers the

  13. Alligator Rivers Analogue Project. Final Report - Volume 1

    International Nuclear Information System (INIS)

    Duerden, P.; Lever, D.A.; Sverjensky, D.A.; Townley, L.R.

    1992-01-01

    This summary report, which highlights the work and findings of the Alligator Rivers Analogue Project (ARAP) is one of a series of 16 volumes, listed below. Detailed descriptions and results are provided in Volumes 2 to 16. Full acknowledgment to individual contributions is provided in the individual reports, and in Appendix I of this report. The findings from the technical studies are discussed in the context of assessments of the long-term performance of geological repositories for radioactive wastes, which are being undertaken in many countries. They are also considered in an integrated 'Scenario Development' approach, aimed to understand the formation of the ore deposit. Despite their inherent uncertainties, the findings provide a basis for assessing the way in which radionuclides will migrate in environments with a variety of geologic settings and over a range of different geologic timescales. Thus, section 2 of this report discusses the concept of using uranium deposits as natural analogues and refers to a number of such studies, including those at the Koongarra deposit in the Alligator Rivers Region of the Northern Territory of Australia. Section 3 reviews early scientific work in the Alligator Rivers Region and summarises the results of the analogue studies undertaken between 1981 and 1987 that were funded by the US Nuclear Regulatory Commission (USNRC) and the UK Department of the Environment (UKDoE). Section 4 describes the objectives of ARAP and the manner in which the study was conducted and provides a general outline of the project and a summary of the findings. A general description of the Koongarra ore deposit, the focus of ARAP, is provided in Section 5, with Sections 6-13 providing summaries of the work carried out to characterise the site in detail and provide data for modelling. Sections 14-18 discuss how this data was used in modelling and how the results may be applied for performance assessment studies. Finally, Section 19 considers the

  14. EUDP project 'Low noise airfoil' - Final report

    Energy Technology Data Exchange (ETDEWEB)

    Bertagnolio, F. (ed.)

    2012-06-15

    This document summarizes the scientific results achieved during the EUDP-funded project 'Low-Noise Airfoil'. The goals of this project are, on one side to develop a measurement technique that permits the evaluation of trailing edge noise in a classical aerodynamic wind tunnel, and on the other side to develop and implement a design procedure to manufacture airfoil profiles with low noise emission. The project involved two experimental campaigns: one in the LM Wind Power wind tunnel, a classical aerodynamic wind tunnel, in Lunderskov (Denmark), the second one in the Virginia Tech Stability Wind Tunnel at the Aerospace and Ocean Engineering Department of Virginia Tech (Blacksburg, VA, USA), also a classical aerodynamic wind tunnel but equipped with an anechoic chamber that allow to perform acoustic measurements. On the theoretical side, the above experiments yield a series of model validations and improvements. In particular, the so-called TNO trailing edge noise model could be significantly improved by introducing turbulence anisotropy in its formulation, as well as the influence of the boundary layer mean pressure gradient. This two characteristics are inherent to airfoil flows but were neglected in the original approach. In addition, the experimental results are confronted to detailed Large Eddy Simulations of the airfoil flow giving more insight into the flow turbulence characteristics. The methodology which consists in measuring surface pressure spectra directly on the airfoil surface using flush-mounted microphones in order to evaluate far-field noise emission using additional theoretical results has been validated. This technique presents the advantage that it can easily be used in a classical aerodynamic wind tunnel and does not require the use of an anechoic facility. It was developed as a substitute to the original plan that consisted in measuring acoustic waves using hot-wire velocimetry. This last technique proved ineffective in the LM Wind

  15. Healy Clean Coal Project: Healy coal firing at TRW Cleveland Test Facility. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Koyama, T.; Petrill, E.; Sheppard, D.

    1991-08-01

    A test burn of two Alaskan coals was conducted at TRW`s Cleveland test facility in support of the Healy Clean Coal Project, as part of Clean Coal Technology III Program in which a new power plant will be constructed using a TRW Coal Combustion System. This system features ash slagging technology combined with NO{sub x} and SO{sub x} control. The tests, funded by the Alaska Industrial Development and Export Authority (AIDEA) and TRW, were conducted to verify that the candidate Healy station coals could be successfully fired in the TRW coal combustor, to provide data required for scale-up to the utility project size requirements, and to produce sufficient flash-calcined material (FCM) for spray dryer tests to be conducted by Joy/NIRO. The tests demonstrated that both coals are viable candidates for the project, provided the data required for scale-up, and produced the FCM material. This report describes the modifications to the test facility which were required for the test burn, the tests run, and the results of the tests.

  16. Monitoring as component for the decision making in final repository projects; Monitoring als Baustein fuer die Entscheidungsfindung in Endlagerprojekten

    Energy Technology Data Exchange (ETDEWEB)

    Kallenbach-Herbert, Beate; Alt, Stefan [Oeko-Institut e.V., Darmstadt (Germany)

    2012-12-15

    The monitoring in final radioactive waste repositories is performed by continuous or repeated measurements of technical and geologic parameters during long time periods. The collected data serve manifold purposes. The central focus is to provide fundamental information for the decision between and within the three phases of a final repository project. This means that monitoring is not only the sum of technical surveillance measures. Monitoring is also important for several sociopolitical decisions, for instance in case of closure of the repository. The article discusses possible objectives and shows the relevant technical aspects that are used deduce the requirements for an integrated monitoring concept. It is shown that a monitoring concept should be developed early enough involving all groups that are concerned by the waste disposal project.

  17. Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Jin [University of California Santa Cruz; Zhao, Yiping [University of Georgia at Athens

    2014-12-05

    In this entire project period from 2005-2014, we have made significant progress in developing novel nanostructures of metal oxides (MOs) for solar hydrogen generation based on photoelectrochemical (PEC). Materials investigated are focused on 1D and 0D MO nanostructures of TiO2, WO3, ZnO, and Fe2O3 in conjunction with quantum dot (QD) sensitization and chemical doping (N or H) to alter their electronic band structures for both visible light absorption and for facilitating interfacial charge transport. In addition, we have used plasmonic metal nanostructures to enhance the PEC performance by improving light absorption of QDs via enhanced scattering of the plamonic metal. Most importantly, we have discovered a multipronged strategy for improving PEC performance: using plasmonic metal nanostructure to enhance light absorption, QDs to improve charge transfer, and chemical doping to increase charge transport in metal oxides for PEC. The combination is critical for overall high efficiency of PEC. This strategy is developed and demonstrated for the first time to our best knowledge.

  18. Practicum projects of value: a successful strategic partnership between nurse executives and master's level academia.

    Science.gov (United States)

    Hahn, Joyce A

    2010-01-01

    The opportunity exists for academia and the nursing executive community to collaboratively create cultures of excellence. One university formed relationships of collaborative synergy with nurse executives to provide practicum experiences of value for both the graduate nursing administration students and the health care facilities. The strategic preceptor partnerships offer graduate students the invaluable opportunity to experience the in-depth, real world perspective of nursing administration resulting in the enrichment of their academic scholarship. A final practicum work project is designed collaboratively with the preceptor and completed by the end of the second practicum semester. The resulting practicum project is an example of a mutually rewarding experience for the graduate nursing administration student and the preceptor. The collaborative synergistic model is a win-win situation for the university and the health care facility.

  19. Final report on the Project Research 'Assessment of Human Exposure to Environmental Radiation'

    International Nuclear Information System (INIS)

    1989-03-01

    This is the final report of the Project Research, 'Assessment of Human Exposure to Environmental Radiation', which has been conducted during the period 1983-1988. With the objective of assessing risk of environmental radioactivity to the population, the Project was divided into the following five research groups: (1) research for establishing calculation models and parameters in transfer of radionuclides from crop species through the human body; (2) research for analyzing transfer of radionuclides in the ocean and their contributions to exposure doses in the human body; (3) research for surveying accuracy of exposure models for the external body and respiratory organ and the influential factors; (4) research for determining uptake and biokinetics of radionuclides in the body; and (5) research for estimating and evaluating physical and physiological characteristics of reference Japanese man and the populaltion doses. Effluents from nuclear power plants and reprocessing plants were regarded as radionuclide sources in the water and atmosphere. (N.K.)

  20. Project study for the final disposal of intermediate toxicity radioactive wastes (low- and intermediate-level radioactive wastes) in geological formations

    International Nuclear Information System (INIS)

    1980-08-01

    The present report aimed to show variations in the construction- and operation-technical feasibility of a final repository for low- and intermediate-level radioactive wastes. This report represents the summary of a project study given under contract by Nagra with a view to informing a broader public of the technical conception of a final repository. Particular stress was laid on the treatment of the individual system elements of a repository concept during the construction, operation and sealing phases. The essential basis for the project study is the origin, composition and quantity of the wastes to be disposed. The final repository described in this report is foreseen for the reception of the following low- and intermediate-level solid radioactive wastes: wastes from the nuclear power plant operation; secondary wastes from the reprocessing of nuclear fuels; wastes from the decommissioning of nuclear power plants; wastes from research, medicine and industry

  1. NASA Human Health and Performance Center: Open Innovation Successes and Collaborative Projects

    Science.gov (United States)

    Davis, Jeffrey R.; Richard, Elizabeth E.

    2014-01-01

    In May 2007, what was then the Space Life Sciences Directorate published the 2007 Space Life Sciences Strategy for Human Space Exploration, which resulted in the development and implementation of new business models and significant advances in external collaboration over the next five years. The strategy was updated on the basis of these accomplishments and reissued as the NASA Human Health and Performance Strategy in 2012, and continues to drive new approaches to innovation for the directorate. This short paper describes the open innovation successes and collaborative projects developed over this timeframe, including the efforts of the NASA Human Health and Performance Center (NHHPC), which was established to advance human health and performance innovations for spaceflight and societal benefit via collaboration in new markets.

  2. Clean and efficient energy conversion processes (Cecon-project). Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-31

    The objectives of the work programme reported are the development and testing of two optimised energy conversion processes, both consisting of a radiant surface gas burner and a ceramic heat exchanger. The first sub-objective of the programme is related to industrial heating, drying and curing processes requireing low and medium heat fluxes. It is estimated that around one tenth of the total EC industrial energy use is associated with such processes. The majority of these processes currently use convection and conduction as the main heat transfer mechanisms and overall energy efficiencies are typically below 25%. For many drying and finishing processes (such as curing powder coatings and drying paints, varnishes, inks, and for the fabrication of paper and textiles), radiant heating can achieve much faster dyring rates and higher energy efficiency than convective heating. In the project new concepts of natural gas fired radiant heating have been investigated which would be much more efficient than the existing processes. One element of the programme was the evelopment of gas burners having enhanced radiant efficiencies. A second concerned the investigation of the safety of gas burners containing significant volumes of mixed gas and air. Finally the new gas burners were tested in combination with the high temperature heat exchanger to create highly efficient radiant heating systems. The second sub-objective concerned the development of a compact low cost heat exchanger capable of achieving high levels of heat recovery (up to 60%) which could be easily installed on industrial processes. This would make heat recovery a practical proposition on processes where existing heat recovery technology is currently not cost effective. The project will have an impact on industrial processes consuming around 80 MTOE of energy per year within EU countries (1 MTOE equals 41.8 PJ). The overall energy saving potential of the project is estimated to be around 22 MTOE which is around 10

  3. Project Aprendizaje. Final Evaluation Report 1992-93.

    Science.gov (United States)

    Clark, Andrew

    This report provides evaluative information regarding the effectiveness of Project Aprendizaje, a New York City program that served 269 Spanish-speaking students of limited English proficiency (LEP). The project promoted parent and community involvement by sponsoring cultural events, such as a large Latin American festival. Students developed…

  4. Locked on course: Hydro-Quebec's commitment to mega-projects

    International Nuclear Information System (INIS)

    Maxwell, J.; Briscoe, F.; Suzuki, Tatsujiro; Lee, J.; Stewart, A.

    1997-01-01

    Large organizations often escalate their commitments to mega-project development, even after evidence becomes available of adverse environmental consequences or lack of economic feasibility. This escalation of commitment transcends both sectorial and national boundaries. Preeminent examples include controversial nuclear projects in the US, hydroelectric projects like the Three Gorges Dam in China, and transport projects like the Chunnel and the Concorde. In this article, the authors examine the experience of Hydro-Quebec with the Great Whale Project. They argue that Hydro-Quebec escalated its commitment even after serious questions emerged about its environmental impacts and economic feasibility, because of (1) its earlier success with large projects, (2) its engineering culture''s norms for consistency, and (3) its role in the government''s desire for economic and cultural autonomy. Finally, they discuss the changes that are necessary to break commitments to such projects

  5. Strategies for successful software development risk management

    Directory of Open Access Journals (Sweden)

    Marija Boban

    2003-01-01

    Full Text Available Nowadays, software is becoming a major part of enterprise business. Software development is activity connected with advanced technology and high level of knowledge. Risks on software development projects must be successfully mitigated to produce successful software systems. Lack of a defined approach to risk management is one of the common causes for project failures. To improve project chances for success, this work investigates common risk impact areas to perceive a foundation that can be used to define a common approach to software risk management. Based on typical risk impact areas on software development projects, we propose three risk management strategies suitable for a broad area of enterprises and software development projects with different amounts of connected risks. Proposed strategies define activities that should be performed for successful risk management, the one that will enable software development projects to perceive risks as soon as possible and to solve problems connected with risk materialization. We also propose a risk-based approach to software development planning and risk management as attempts to address and retire the highest impact risks as early as possible in the development process. Proposed strategies should improve risk management on software development projects and help create a successful software solution.

  6. Key Success Factors and Guidance for International Collaborative Design Projects

    Directory of Open Access Journals (Sweden)

    Robby Soetanto

    2015-11-01

    Full Text Available In the built environment (BE sector, the co-creation process of design demands understanding of requirements (as viewed by parties involved, mobilisation of tacit knowledge, negotiation, and complex exchange of information. The need to collaborate over distance has further exacerbated the complexity of the process, and, in itself, represents a significant challenge for BE professionals who are increasingly expected to undertake this process within globally distributed virtual teams. The research aims to identify key success factors and develop guidance for international collaborative design projects, via the implementation of collaborative design courses in UK and Canadian universities over three academic years. Questionnaire surveys, focus groups, observation of online meetings, personal reflections provided data for the analysis. The findings reveal the significance of the perceived risk of collaboration and a difference in preferred communication mode between architects and civil/structural engineers. These findings suggest the impact of training in the subject discipline, and that the opportunity for co-located working has helped the development of trust. The guidance is aimed at BE educators who wish to implement this activity in their courses.

  7. A recent Cleanroom success story: The Redwing project

    Science.gov (United States)

    Hausler, Philip A.

    1992-12-01

    Redwing is the largest completed Cleanroom software engineering project in IBM, both in terms of lines of code and project staffing. The product provides a decision-support facility that utilizes artificial intelligence (AI) technology for predicting and preventing complex operating problems in an MVS environment. The project used the Cleanroom process for development and realized a defect rate of 2.6 errors/KLOC, measured from first execution. This represents the total amount of errors that were found in testing and installation at three field test sites. Development productivity was 486 LOC/PM, which included all development labor expended in design specification through completion of incremental testing. In short, the Redwing team produced a complex systems software product with an extraordinarily low error rate, while maintaining high productivity. All of this was accomplished by a project team using Cleanroom for the first time. An 'introductory implementation' of Cleanroom was defined and used on Redwing. This paper describes the quality and productivity results, the Redwing project, and how Cleanroom was implemented.

  8. Final audit report of remedial action construction at the UMTRA project site Rifle, Colorado. Rev. 1

    International Nuclear Information System (INIS)

    1997-01-01

    This final audit report summarizes the assessments performed by the U.S. Department of Energy (DOE) Environmental Restoration Division (ERD) and its Technical Assistance Contractor (TAC) of remedial action compliance with approved plans, specifications, standards, and 40 CFR Part 192 at the Rifle, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. Remedial action construction was directed by the Remedial Action Contractor (RAC)

  9. Challenges in the Successful Research Management of a Collaborative EU Project.

    Science.gov (United States)

    Zikos, Dimitrios; Diomidous, Marianna; Mantas, John

    2012-03-01

    Successful research management requirements include; equal teamwork and efficient coordination, in order to increase the impact of the research outcomes and provide added value knowledge. Aim of this paper is to discuss the strategies that have been followed during the RN4CAST study, the largest nursing multi-country research project ever conducted in Europe. The paper focuses on the core research strategies rather than on the administrative activities, which are inevitably also required for the success of a large scale research. This paper is an extension of a conference presentation in the International Conference of the European Federation for Medical Informatics (MIE) 2011 in Oslo, and was subsequently published in the Studies in Health Technology and Informatics book series (IOS Press) under the title "Research management: the case of RN4CAST." Management of a multicountry nursing survey requires the use of common data collection tools, applicable to every context, research protocols supporting the scope of the research, data models for multi-country analyses and global dissemination strategies. Challenges that may be faced during the implementation of the study include the individualized confrontation of obstacles during data collection, the coherence of national procedures (for example permissions for data collection) in European level, and the challenge to gain information of added value for the EU, by aggregating the national survey results through a powerful data analysis model. Communication strategies are also discussed.

  10. An Undergraduate Mechatronics Project Class at Philadelphia University, Jordan: Methodology and Experience

    Science.gov (United States)

    Tutunji, T. A.; Saleem, A.; Rabbo, S. A.

    2009-01-01

    Mechatronics is a branch of engineering whose final product should involve mechanical movements controlled by smart electronics. The design and implementation of functional prototypes are an essential learning experience for the students in this field. In this paper, the guidelines for a successful mechatronics project class are presented,…

  11. Success factors of energy performance contracting (EPC) for sustainable building energy efficiency retrofit (BEER) of hotel buildings in China

    International Nuclear Information System (INIS)

    Xu Pengpeng; Chan, Edwin Hon-Wan; Queena Kun Qian

    2011-01-01

    Hotel building is a type of high-energy-consuming building and most existing hotel buildings need energy efficiency improvement in China. Energy performance contracting (EPC) is considered a win-win mechanism to organize building energy efficiency retrofit (BEER) project. However, EPC mechanism has been introduced into China relatively recently and many EPCs have not been successful in building energy efficiency retrofit projects. This research aims to develop a set of critical success factors (CSFs) of EPC for sustainable energy efficiency retrofit (BEER) of hotel buildings in China. Semi-structured interviews and a questionnaire survey with practitioners and other professionals were conducted. The findings reveal the relative importance of the 21 number of identified success factors. In order to explore the underlying relationship among the identified critical success factors (CSFs), factor analysis method was adopted for further investigation, which leads to grouping the 21 identified CSFs into six clusters. These are (1) project organization process, (2) EPC project financing for hotel retrofit, (3) knowledge and innovation of EPC, sustainable development (SD), and M and V, (4) implementation of sustainable development strategy, (5) contractual arrangement, and (6) external economic environment. Finally, several relevant policies were proposed to implement EPC successfully in sustainable BEER in hotel buildings. - Highlights: → EPC is a win-win mechanism to organize building energy efficiency retrofit project. → CSFs of EPC mechanism for sustainable BEER of hotel building in China are examined. → Six clusters are extracted from 21 identified CSFs based on factor analysis.

  12. Final priority; National Institute on Disability and Rehabilitation Research--Disability and Rehabilitation Projects and Centers Program--Rehabilitation Engineering Research Centers. Final priority.

    Science.gov (United States)

    2013-06-19

    The Assistant Secretary for Special Education and Rehabilitative Services announces a priority for a Rehabilitation Engineering Research Center (RERC) on Technologies to Support Successful Aging with Disability under the Disability and Rehabilitation Research Projects and Centers Program administered by the National Institute on Disability and Rehabilitation Research (NIDRR). The Assistant Secretary may use this priority for a competition in fiscal year (FY) 2013 and later years. We take this action to focus research attention on areas of national need. We intend to use this priority to improve outcomes for individuals with disabilities.

  13. The Oregon Applied Academics Project: Final Report

    Science.gov (United States)

    Pearson, Donna; Richardson, George B.; Sawyer, Jennifer M.

    2013-01-01

    This report contains the findings of the Oregon Applied Academics research and development project which spanned three academic years from 2010 through 2013. The overall purpose of the project was to develop and implement a technical math course that would meet graduation requirements and improve student performance. The State of Oregon has been…

  14. 76 FR 65746 - Notice of Availability of Joint Final Environmental Impact Statement/Final Environmental Impact...

    Science.gov (United States)

    2011-10-24

    ...In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), and the Federal Land Policy and Management Act of 1976, as amended (FLPMA), the Bureau of Land Management (BLM) and the California Public Utilities Commission (CPUC) have prepared a Final Environmental Impact Statement (EIS) and Final Environmental Impact Report (EIR) as a joint environmental analysis document for Tule Wind, LLC's Tule Wind Project (Tule Project) and the San Diego Gas and Electric's (SDG&E) East County Substation Project (ECO Project) and by this notice are announcing the availability of the Final EIS/EIR. By this Notice the BLM is also segregating the public lands within the Tule Project application area from appropriation under the public land laws including the Mining Law, but not the Mineral Leasing or Material Sales Act, for a period of 2 years.

  15. Draft project management update to the Iowa DOT Project Development Manual : final report.

    Science.gov (United States)

    2016-08-01

    This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to : incorporate a greater focus on project management in their project development process. : A technical advisory committee (TAC) ...

  16. Portable linear accelerator development. Final report

    International Nuclear Information System (INIS)

    Schonberg, R.G.

    1983-01-01

    The final report on Project RP 822-6 describes the MINAC 3 development from the recognition of need for a lightweight, portable high-energy device to the successful completion and field use of the MINAC. MINAC, which represents a substantial improvement in field radiographic capability and in technology, rapidly transitioned from proof-of-principle (1978 to 1980) to field-proven product (1980 to 1981). As a result, the decision has been made to develop this report as a users guide as well as a historic record of design, development, and testing program. The first section of this report has the following principal objectives: to describe the existing MINAC equipment capabilities and achievable modifications; to provide applications information for prospective users; and to provide technical information on high-energy radiography useful for familiarization and planning. The users guide section is followed by sections which describe the design basis, development, and application history of MINAC through the course of EPRI RP822 research projects 1 to 5, inclusively

  17. 77 FR 64543 - Notice of Availability of the Final Environmental Impact Statement for the Mount Hope Project...

    Science.gov (United States)

    2012-10-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLNVB01000 L51100000.GN0000.LVEMF12CF010 241A; NVN-082096; NVN-084632; NVN-091272; 12-08807; MO 4500039779; TAS: 14X5017] Notice of Availability of the Final Environmental Impact Statement for the Mount Hope Project, Eureka County, NV Correction...

  18. Final Technical Report on STTR Project DE-FG02-06ER86282 Development and Demonstration of 6-Dimensional Muon Beam Cooling

    Energy Technology Data Exchange (ETDEWEB)

    Muons, Inc.

    2011-05-24

    The overarching purpose of this project was to prepare a proposal for an experiment to demonstrate 6-dimensional muon beam cooling. The technical objectives were all steps in preparing the proposal, which was successfully presented to the Fermilab Accelerator Advisory Committee in February 2009. All primary goals of this project have been met.

  19. Self-esteem, Motivation, and Emotional Intelligence: Three Factors that influence the Successful Design of a Life Project of Middle-school Young Students

    Directory of Open Access Journals (Sweden)

    Andrea Magdalena Lomelí-Parga

    2016-05-01

    Full Text Available The purpose of this research study is to depict the factors that allow young people to effectively carry out their life projects by planning short, mid, and long term goals. The population sample participating in this study was comprised of middle and high school students. This research was executed using mixed methods in order to identify the determining factors for young people who plan to have success in facing the daily life challenges, as well as today’s society demands, through a solid construction of their private vision of the future. The results of this project determine that the features which allow the conclusion of students’ life projects are closely related with a high self-esteem and motivation, as well as some emotional intelligence that allow students to visualize a successful personal and professional future.

  20. Bibliometric analysis of undergraduate final research projects in Nutrition courses in the state of Rio Grande do Norte, Brazil

    Directory of Open Access Journals (Sweden)

    Taiana Brito MENÊZES

    2016-02-01

    Full Text Available ABSTRACT Objective: To evaluate the profile of academic production of undergraduates in Nutrition courses in the state of Rio Grande do Norte, Brazil. Methods: The bibliometric study was conducted with undergraduate final research projects from five courses in Nutrition in the state of Rio Grande do Norte during 2013 and 2014. The following variables were collected: institution, title of project, number of authors, academic degree of the advisor, study design, area of study interest, type of study, study setting, submission to the ethics committee, and keywords. Pearson's Chi-square test was used to assess the variable area of study interest with a significance level at p≤0.05 and 95% confidence interval. Results: Of the 195 projects analyzed, 79.0% were developed at universities. We found a higher frequency of academic articles (68.2% developed by a single student (65.6%, advised by a professor with a Masters degree (57.9%, with a cross-sectional study design (48.2%, and without submission to the research ethics committee (49.2%. The mean adequacy of keywords was 50.0%. Conclusion: The quantitative approach was the most predominant characteristic of the final research projects and the most frequently researched area of knowledge was public health. The methodological approaches of the research projects were considered weak, which suggests the need to improve the quality of scientific methodology during undergraduate studies, considering the important benefits derive from researches as an active methodology.

  1. Activating the role of women in water projects

    Directory of Open Access Journals (Sweden)

    Mohammed T. Kholif

    2014-10-01

    Finally, the study ended up that women have a significant role in raising the efficiency and effectiveness of New Assiut Barrage. The findings of the study can be summarized as the success of water projects is depending partially on the women role through changing the negative social traditions achieving effective participation of individuals, raising of women community self-confidence, improve women different roles, stimulating their spirit of competition, participation and volunteering.

  2. Project management - Factors leading to success or failure

    Science.gov (United States)

    Kelley, A. J.; Murphy, D. C.

    1974-01-01

    This paper presents initial findings of a study designed to detail the relationships among situational, structural, and process variables as they relate to project effectiveness. In the paper, emphasis is placed on delineating those variables which tend to improve and those which tend to impede project effectiveness.

  3. Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Glasser, Alan H. [Fusion Theory and Computation Inc., Kingston, WA (United States)

    2018-02-02

    Final technical report on DE-SC0016106. This is the final technical report for a portion of the multi-institutional CEMM project. This report is centered around 3 publications and a seminar presentation, which have been submitted to E-Link.

  4. Final performance report for Project JEM

    Energy Technology Data Exchange (ETDEWEB)

    McKinney, M.J.; Jenkins, S.

    1997-12-31

    Project JEM (Jarvis Enhancement of Males) is a pre-college program directed toward stimulating disadvantaged, talented African American males in grades four, five, and six to attend college and major in mathematics, science, computer science, or related technical areas needed by the US Department of Energy. Twenty young African American male students were recruited from Gladewater Independent School District (ISD), Longview ISD, Hawkins ISD, Tyler ISD, Winona ISD and big Sandy ISD. Students enrolled in the program range from ages 10 to 13 and are in grades four, five and six. Student participants in the 1997 Project JEM Program attended Saturday Academy sessions and a four week intensive, summer residential program. The information here provides a synopsis of the activities which were conducted through each program component.

  5. Supercompaction/grouting demonstration project: Final report

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of this supercompaction demonstration project was to allow Martin Marietta Energy Systems, Inc. (The Company), to obtain cost analysis and performance information on volume reduction and waste encapsulation of solid, low-level contaminated waste (SLW). Ultimately, this information will be used to help define a waste disposal process for SLW that is acceptable to regulatory agencies and the US Department of Energy, Oak Ridge Operations (DOE/ORO). The technical objectives of the demonstration project were: (1) to obtain detailed performance data on each of the compacted barrels; (2) evaluate operating performance problems that may have occurred; (3) describe in detail the compaction and encapsulation process; and (4) to obtain operating cost data for the performance of this demonstration

  6. Reinventing project management the diamond approach to successful growth & innovation

    CERN Document Server

    Shenhar, Aaron J.

    2007-01-01

    Projects are the engines that drive innovation from idea to commercialization. In fact, the number of projects in most organizations today is expanding while operations is shrinking. Yet, since many companies still focus on operational excellence and efficiency, most projects fail--largely because conventional project management concepts cannot adapt to a dynamic business environment. Moreover, top managers neglect their company's project activity, and line managers treat all their projects alike--as part of operations. Based on an unprecedented study of more than 600 projects in a variety of businesses and organizations around the globe, "Reinventing Project Management" provides a new and highly adaptive model for planning and managing projects to achieve superior business results.

  7. Fuzzy logic approach for energetic and economic evaluation of hydroelectric projects

    International Nuclear Information System (INIS)

    Iliev, Atanas M.

    2003-01-01

    of the rules is proposed for obtaining the final result, which is also triangular fuzzy number. Economic parameters of the project, such as Net Present Value, Profitability Index and Internal Rate of Return are calculated as a fuzzy numbers. For this purpose the input parameters with high degree of uncertainty such as: discount rate, price of electricity, duration of the construction of the hydro power pant and economical life-time of the project are modelled with triangular fuzzy numbers. Economical evaluation of the project is performed by original fuzziffied criteria in order model the real decision making process for accepting/rejecting the project. The classical economical criteria are modified in fuzzy sense. Thus, the comparison between two fuzzy numbers: Calculated Economic Fuzzy Parameters of the project and modeled Investors View for successful project is worked out for final decision. For this purpose a satisfaction function which measure degree of plausibility that one fuzzy number is higher/lower then the other one, is applied. The developed methodology is applied on hydro power project St. Petka (in designing phase). In this case plausible yearly production and the main economical parameters are calculated. According the previously specified investor's point of view for successful investment, the evaluation of the project for final decision, is also included. Developed model is extension of the classical deterministic model and enables possibilities to perceive influence of the specific parameters and uncertainty to the rate of the project. Furthermore, since the methodology applied in this thesis provides projects evaluation in a new and natural way, closer to the human reasoning, the model could be successfully applied on a number of hydroelectric projects and to contribute in a further development of engineering economy.(Author)

  8. Reframing Success and Failure of Information Systems

    DEFF Research Database (Denmark)

    Cecez-Kecmanovic, Dubravka; Kautz, Karlheinz; Abrahall, Rebecca

    2014-01-01

    -networks of developers, managers, technologies, project documents, methodologies, and other actors. Drawing from a controversial case of a highly innovative information system in an insurance company-considered a success and failure at the same time- the paper reveals the inherent indeterminacy of IS success and failure......he paper questions common assumptions in the dominant representational framings of information systems success and failure and proposes a performative perspective that conceives IS success and failure as relational effects performed by sociomaterial practices of IS project actor...... that performed both different IS realities and competing IS assessments. The analysis shows that the IS project and the implemented system as objects of assessment are not given and fixed, but are performed by the agencies of assessment together with the assessment outcomes of success and failure. The paper...

  9. The importance of procurement negotiations for project success

    NARCIS (Netherlands)

    Hoezen, M; Volker, L.

    2015-01-01

    The allocation of a contract for public construction projects in Europe usually requires a European tender procedure. This has to do with the size, the use of public means and the complexity of this type of projects. Compared to regular partnerships, it is hard to develop trust between the buyer and

  10. Project Neil Bone: a great success!

    Science.gov (United States)

    Miles, R.

    2010-08-01

    Last October, the ARPS initiated a new observing project to make photometric observations of asteroids which reach a phase angle of 0.2° or less at opposition. The stimulus for this followed the naming last year of asteroid (7102) in honour of Neil Bone, our former Meteor Section Director, who sadly died last year. It turned out that (7102) would reach opposition on January 18 this year at an unusually low phase angle - just 0.03°. This is so small an angle that if you were standing on the asteroid on this date, you would be able to see the Earth transiting across the face of the Sun! The probability that (7102) would attain such a low phase angle is about once in several hundred years. So our project was set up with a view to observing its namesake along with a selection of thirteen other asteroids, which also happened to pass through very low phase angle at their opposition during the period 2009 October-2010 March.

  11. EUDP Project: Low Noise Airfoil - Final Report

    DEFF Research Database (Denmark)

    This document summarizes the scientific results achieved during the EUDP-funded project `Low-Noise Airfoil'. The goals of this project are, on one side to develop a measurement technique that permits the evaluation of trailing edge noise in a classical aerodynamic wind tunnel, and on the other side...... to develop and implement a design procedure to manufacture airfoil profiles with low noise emission. The project involved two experimental campaigns: one in the LM Wind Power wind tunnel, a classical aerodynamic wind tunnel, in Lunderskov (DK), the second one in the Virginia Tech Stability Wind Tunnel....... In particular, the so-called TNO trailing edge noise model could be significantly improved by introducing turbulence anisotropy in its formulation, as well as the influence of the boundary layer mean pressure gradient. This two characteristics are inherent to airfoil flows but were neglected in the original...

  12. Final report for the Department of Energy funded cooperative agreement ''Electronic Research Demonstration Project'' [University electronic research administration demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Rodman, John

    1998-07-31

    This is the final report for the Department of Energy (DOE) funded cooperative agreement ''Electronic Research Demonstration Project (DE-FC02-92ER35180)'' for the period August 1994-July 1998. The goal of the project, referred to as NewERA, was to demonstrate the use of open standards for electronic commerce to support research administration, otherwise referred to as Electronic Research Administration (ERA). The NewERA demonstration project provided a means to test interagency standards developed within the Federal Grant Electronic Commerce Committee, a group comprised of federal granting agencies. The NewERA program was initiated by DOE. NewERA was comprised of three separate, but related, ERA activities in preaward administration, postaward administration, and secure Internet commerce. The goal of New ERA was to demonstrate an open standard implementation of ERA using electronic data interchange, e-mail and Internet transaction security between grant applicants and DOE, along with t h e other participating agencies.

  13. Evaluation of the Vocational Preparation and Success of Handicapped Individuals Who Reside in Rural Areas of Florida. Florida Rural Research Project. Final Report.

    Science.gov (United States)

    Budd, Diane M.

    Phase 2 of a three-phase project examined the secondary education background and employment adjustment of handicapped youth in rural counties in Florida. (Phase 1 was a pilot study.) Subjects were former special education students in five rural project counties who had been identified as needing services in the area of educable mental retardation,…

  14. Final hazard classification and auditable safety analysis for the 105-C Reactor Interim Safe Storage Project

    International Nuclear Information System (INIS)

    Rodovsky, T.J.; Larson, A.R.; Dexheimer, D.

    1996-12-01

    This document summarizes the inventories of radioactive and hazardous materials present in the 105-C Reactor Facility and the operations associated with the Interim Safe Storage Project which includes decontamination and demolition and interim safe storage of the remaining facility. This document also establishes a final hazard classification and verifies that appropriate and adequate safety functions and controls are in place to reduce or mitigate the risk associated with those operations

  15. Understanding the Meaning of “Project Success”

    Directory of Open Access Journals (Sweden)

    Goparaju Purna Sudhakar

    2016-09-01

    Full Text Available Fortune 500 organizations are executing their tasks using projects. Project management is the area of concentration across the world. Different stakeholders have a different perspective about project success. The meaning of project success had been explained in this article. In addition, the Project Critical Success Factors (CSFs were mentioned. The research of Standish Group on project success and project success metrics was presented. Earlier research on the meaning of project success and project critical success factors was highlighted. The works of Jeffery K. Pinto and Dennis P. Slevin, David and Adam, DeLone and McLean, and The Standish Group Research were discussed in this article. The methodology included secondary research based on literature view of prominent empirical studies and the literature reviews by making note of findings and observations from those studies. The initial literature collected led to further search of articles based on their references. The research findings indicate that the top of the most success factors for many projects include project objective, top management commitment, competent project team, and user involvement.

  16. Demonstration Project 111, ITS/CVO Technology Truck, Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Gambrell, KP

    2002-01-11

    In 1995, the planning and building processes began to design and develop a mobile demonstration unit that could travel across the nation and be used as an effective outreach tool. In 1997, the unit was completed; and from June 1997 until December 2000, the Federal Highway Administration (FHWA)/Federal Motor Carrier Safety Administration (FMCSA) mobilized the Technology Truck, also known as Demonstration Project No. 111, ''Advanced Motor Carrier Operations and Safety Technologies.'' The project featured the latest available state-of-the-practice intelligent transportation systems (ITS) technologies designed to improve both the efficiency and safety of commercial vehicle operations (CVO). The Technology Truck was designed to inform and educate the motor carrier community and other stakeholders regarding ITS technologies, thus gaining support and buy-in for participation in the ITS program. The primary objective of the project was to demonstrate new and emerging ITS/CVO technologies and programs, showing their impact on motor carrier safety and productivity. In order to meet the objectives of the Technology Truck project, the FHWA/FMCSA formed public/private partnerships with industry and with Oak Ridge National Laboratory to demonstrate and display available ITS/CVO technologies in a cooperative effort. The mobile demonstration unit was showcased at national and regional conferences, symposiums, universities, truck shows and other venues, in an effort to reach as many potential users and decision makers as possible. By the end of the touring phase, the ITS/CVO Technology Truck had been demonstrated in 38 states, 4 Canadian provinces, 88 cities, and 114 events; been toured by 18,099 people; and traveled 115,233 miles. The market penetration for the Technology Truck exceeded 4,000,000, and the website received more than 25,000 hits. In addition to the Truck's visits, the portable ITS/CVO kiosk was demonstrated at 31 events in 23 cites in 15

  17. Final status of the salt repository project waste package program experimental database

    International Nuclear Information System (INIS)

    Thornton, B.M.; Reimus, P.W.

    1988-03-01

    This report describes the final status of the Salt Repository Project Waste Package Program Experimental Database. The data base serves as a clearinghouse for all data collected within the Waste Package Program (WPP) and its predecessor programs at Pacific Northwest Laboratory (PNL). The database was maintained using RS/1 database management software. Documented assurance that the entries in the database were consistent with experimental records was provided by having each experimentalist inspect the entries and signify that they were in agreement with the records. The inspection and signoff were done per PNL technical procedures. Data for which it was impossible to obtain the experimentalist's inspection and signature were segregated from the rest of the database, although they could still be accessed by WPP staff. The WPPED contains two groups of subdirectories. One group contains data taken prior to the installation of quality assurance procedures at PNL. The other group of subdirectories contains data taken under the NQA-1 procedures since their installation in April 1985. As part of closeout activities in the Salt Repository Project, the WPP database has been archived onto magnetic media. The data in the database are available by request on magnetic media or in hardcopy form. 2 refs

  18. 78 FR 11672 - Notice of Availability of the Final Environmental Impact Statement for the Alta East Wind Project...

    Science.gov (United States)

    2013-02-19

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA-052537, LLCAD05000, L51010000.LVRWB11B4520.FX0000] Notice of Availability of the Final Environmental Impact Statement for the Alta East Wind Project, Kern County, CA, and Proposed Land Use Plan Amendment AGENCY: Bureau of Land Management, Interior...

  19. Klickitat Cogeneration Project: Final environmental assessment

    International Nuclear Information System (INIS)

    1994-09-01

    To meet BPA's contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA's proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact)

  20. Klickitat Cogeneration Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  1. Cernavoda - Unit 2. A strategic project for Romania

    International Nuclear Information System (INIS)

    Saroudis, J.I.; Chirica, T.; Villabruna, G.

    1999-01-01

    The paper presents some key aspects of the Romanian nuclear program, focusing on Cernavoda NPP Unit No. 2 and the partnership with Atomic Energy of Canada Ltd. (AECL) and ANSALDO Italy for completion of this project. A brief historical presentation of the Romanian nuclear program is included. The success of Cernavoda NPP Unit 1 represents an important element in finalizing Unit 2 in an advanced state of equipment installation and more than 40 % complete. Also, the national infrastructure, including the legal framework and new Electricity Law represents a positive element for Project completion. The Romanian Nuclear Regulatory Body represents the guarantee for the safe operation of CANDU reactors in Romania.(author)

  2. Project Familia. Final Evaluation Report, 1993-94. OER Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn, NY. Office of Educational Research.

    Project Familia was an Elementary and Secondary Education Act Title VII project in its second year in 1993-94 in New York City. Project Familia served 77 children at 3 schools who were identified as limited English proficient, special education students in prekindergarten through fifth grade and their parents. The project provided after-school…

  3. Final Report for NMBSA Project, Monika Kaden, 2016

    Energy Technology Data Exchange (ETDEWEB)

    Ward, William Carl [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-12-13

    The following pages define the objectives and results for Project 022, requested by Monika Kaden, a sculptor who maintains studios in Santa Fe. This effort was first approved in February 2016, and was completed during several different time segments spread over the year, depending on Monika’s availability. The project deliverables that are of primary use to the customer are digital data files that are to be delivered electronically. This report is a summary overview of how the project was conducted.

  4. Final Technical Report. Project Boeing SGS

    Energy Technology Data Exchange (ETDEWEB)

    Bell, Thomas E. [The Boeing Company, Seattle, WA (United States)

    2014-12-31

    Boeing and its partner, PJM Interconnection, teamed to bring advanced “defense-grade” technologies for cyber security to the US regional power grid through demonstration in PJM’s energy management environment. Under this cooperative project with the Department of Energy, Boeing and PJM have developed and demonstrated a host of technologies specifically tailored to the needs of PJM and the electric sector as a whole. The team has demonstrated to the energy industry a combination of processes, techniques and technologies that have been successfully implemented in the commercial, defense, and intelligence communities to identify, mitigate and continuously monitor the cyber security of critical systems. Guided by the results of a Cyber Security Risk-Based Assessment completed in Phase I, the Boeing-PJM team has completed multiple iterations through the Phase II Development and Phase III Deployment phases. Multiple cyber security solutions have been completed across a variety of controls including: Application Security, Enhanced Malware Detection, Security Incident and Event Management (SIEM) Optimization, Continuous Vulnerability Monitoring, SCADA Monitoring/Intrusion Detection, Operational Resiliency, Cyber Range simulations and hands on cyber security personnel training. All of the developed and demonstrated solutions are suitable for replication across the electric sector and/or the energy sector as a whole. Benefits identified include; Improved malware and intrusion detection capability on critical SCADA networks including behavioral-based alerts resulting in improved zero-day threat protection; Improved Security Incident and Event Management system resulting in better threat visibility, thus increasing the likelihood of detecting a serious event; Improved malware detection and zero-day threat response capability; Improved ability to systematically evaluate and secure in house and vendor sourced software applications; Improved ability to continuously monitor

  5. Ingredients for successful partnerships

    NARCIS (Netherlands)

    S.M. Pfisterer (Stella)

    2011-01-01

    textabstractFor the development of new cross-sector partnerships it is required to know what the essence of successful partnership projects is. Which factors influence success or failure of partnerships is highly related to the specific context where partnerships operate. The literature on critical

  6. Examples of Department of Energy Successes for Remediation of Contaminated Groundwater: Permeable Reactive Barrier and Dynamic Underground Stripping ASTD Projects

    International Nuclear Information System (INIS)

    Purdy, C.; Gerdes, K.; Aljayoushi, J.; Kaback, D.; Ivory, T.

    2002-01-01

    Since 1998, the Department of Energy's (DOE) Office of Environmental Management has funded the Accelerated Site Technology Deployment (ASTD) Program to expedite deployment of alternative technologies that can save time and money for the environmental cleanup at DOE sites across the nation. The ASTD program has accelerated more than one hundred deployments of new technologies under 76 projects that focus on a broad spectrum of EM problems. More than 25 environmental restoration projects have been initiated to solve the following types of problems: characterization of the subsurface using chemical, radiological, geophysical, and statistical methods; treatment of groundwater contaminated with DNAPLs, metals, or radionuclides; and other projects such as landfill covers, purge water management systems, and treatment of explosives-contaminated soils. One of the major goals of the ASTD Program is to deploy a new technology or process at multiple DOE sites. ASTD projects are encouraged to identify subsequent deployments at other sites. Some of the projects that have successfully deployed technologies at multiple sites focusing on cleanup of contaminated groundwater include: Permeable Reactive Barriers (Monticello, Rocky Flats, and Kansas City), treating uranium and organics in groundwater; and Dynamic Underground Stripping (Portsmouth, and Savannah River), thermally treating DNAPL source zones. Each year more and more new technologies and approaches are being used at DOE sites due to the ASTD program. DOE sites are sharing their successes and communicating lessons learned so that the new technologies can replace the baseline or standard approaches at DOE sites, thus expediting cleanup and saving money

  7. Pay For Success And Population Health: Early Results From Eleven Projects Reveal Challenges And Promise.

    Science.gov (United States)

    Lantz, Paula M; Rosenbaum, Sara; Ku, Leighton; Iovan, Samantha

    2016-11-01

    Pay for success (PFS) is a type of social impact investing that uses private capital to finance proven prevention programs that help a government reduce public expenditures or achieve greater value. We conducted an analysis of the first eleven PFS projects in the United States to investigate the potential of PFS as a strategy for financing and disseminating interventions aimed at improving population health and health equity. The PFS approach has significant potential for bringing private-sector resources to interventions regarding social determinants of health. Nonetheless, a number of challenges remain, including structuring PFS initiatives so that optimal prevention benefits can be achieved and ensuring that PFS interventions and evaluation designs are based on rigorous research principles. In addition, increased policy attention regarding key PFS payout issues is needed, including the "wrong pockets" problem and legal barriers to using federal Medicaid funds as an investor payout source. Project HOPE—The People-to-People Health Foundation, Inc.

  8. Final Technical Progress Report: Development of Low-Cost Suspension Heliostat; December 7, 2011 - December 6, 2012

    Energy Technology Data Exchange (ETDEWEB)

    Bender, W.

    2013-01-01

    Final technical progress report of SunShot Incubator Solaflect Energy. The project succeeded in demonstrating that the Solaflect Suspension Heliostat design is viable for large-scale CSP installations. Canting accuracy is acceptable and is continually improving as Solaflect improves its understanding of this design. Cost reduction initiatives were successful, and there are still many opportunities for further development and further cost reduction.

  9. The Heidelberg Basin Drilling Project - Sedimentology and Stratigraphy of the Quaternary succession

    Science.gov (United States)

    Ellwanger, Dietrich; Gabriel, Gerald; Hahne, Jürgen; Hoselmann, Christian; Menzies, John; Simon, Theo; Weidenfeller, Michael; Wielandt-Schuster, Ulrike

    2010-05-01

    Within the context of the Heidelberg Basin Drilling Project (Gabriel et al. 2008), a detailed sediment succession is presented here based upon deep drillings taken at Heidelberg UniNord and Mannheim Käfertal. Sediment structures, and micromorphological and pollen analyses were conducted and used to reconsider some of the climate transitions within the lower Pleistocene. A new and novel scenario is postulated regarding the preservation of Quaternary sediment packages within the Cenozoic Graben environment of the Heidelberg basin. The palynological evidence comprises the periods of warm climate of the Holsteinian (mainly Abies (fir), some Fagus (beech), Pterocarya & Azolla); the Cromerian (Pinus-Picea-QM (pine-spruce-QM)); the Bavelian (Abies, Tsuga (hemlock fir), QM & phases of increased NAP including Pinus); the Waalian (Abies, Tsuga, QM); and the Tiglian (Fagus & early Pleistocene taxa especially Sciadopytis, downward increasing Tertiary taxa). The sediment package was studied both macroscopically and microscopically. Both techniques provide evidence of fluvial, lacustrine and mass movement sedimentary processes. Some include evidence of periglacial processes (silt droplets within fine grained sands indicative of frozen ground conditions). The periglacial structures are often, not always, accompanied by pollen spectra dominated by pine and NAP. E.g. the Tiglian part of the succession shows periglacial sediment structures at its base and top but not in its middle sections. I.e. it appears not as a series of warm and cold phases but rather as a constant warm period with warm-cold-alternations at its bottom and top. All results illustrate sediment preservation in the Heidelberg basin almost throughout the Quaternary. This may be due to tectonic subsidence, but also to compaction by sediment loading of underlying fine sediments (Oligocene to Quaternary) leading to incomplete but virtually continuous sediment preservation (Tanner et al. 2009). References Gabriel, G

  10. WindFloat Pacific Project, Final Scientific and Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Banister, Kevin [Principle Power, Inc., Emeryville, CA (United States)

    2017-01-17

    PPI’s WindFloat Pacific project (WFP) was an up to 30 MW floating offshore wind demonstration project proposed off the Coast of Oregon. The project was to be sited approximately 18 miles due west of Coos Bay, in over 1000 ft. of water, and is the first floating offshore wind array proposed in the United States, and the first offshore wind project of any kind proposed off the West Coast. PPI’s WindFloat, a semi-submersible foundation designed for high-capacity (6MW+) offshore wind turbines, is at the heart of the proposed project, and enables access to the world class wind resource at the project site and, equally, to other deep water, high wind resource areas around the country.

  11. ORCID @ CMU: Successes and Failures

    Directory of Open Access Journals (Sweden)

    Denise Troll Covey

    2016-02-01

    Full Text Available Setting and Objectives: Carnegie Mellon University (CMU recently planned and implemented a project to help CMU researchers get an Open Researcher and Contributor Identifier (ORCID and to enable administrators to integrate the ORCIDs into university systems. This article describes and assesses the planning, performance, and outcome of this initiative, branded ORCID @ CMU. Design and Methods: The article chronicles why and how ORCID was integrated at CMU, including the rationale for changes in strategic plans. It assesses researcher participation in the project using transaction log and content analyses, and the performance of the ORCID project team using recommendations in the Jisc ORCID project report, frankly reporting the team’s successes and failures. The article concludes with lessons learned that should inform ORCID integration projects and expectations at other institutions. Results: The ORCID @ CMU web application was a great success. However, the project team did not allow enough time to prepare or devote enough attention to advocacy. The marketing message was not sufficiently persuasive and the marketing channels were not particularly effective. The overall participation rate in ORCID @ CMU was far below the target of 40%, though participation in many demographics exceeded the goal. Conclusions: Strategic planning does not guarantee success. Secure more than lip service from senior administrators. Recruit champions from across the institution. Develop a message that resonates with researchers. Allow sufficient time to prepare. Empower the project manager. Start with the low hanging fruit. Develop special outreach to doctoral students and postdocs.

  12. CERN in FP7: very successful participation so far

    CERN Multimedia

    2009-01-01

    The first two years of the seventh Framework Programme were very successful for CERN – 27 EU projects were selected for funding in 2007 and 2008, with the total EC contribution exceeding 33 million euros.The seventh European Union Framework Programme for research, technological development and demonstration activities (FP7) started on 1 January 2007 and will cover the period from 2007 to 2013. With a total budget of 50.5 billion euros, FP7 is the largest Framework Programme in the history of the EU. FP7 consists of four major sub-programmes, referred to as "Specific Programmes": "Cooperation" is focused on collaborative research projects and is divided into 10 thematic areas. "Ideas" is a new EU programme for funding frontier research in all fields of science. "Capacities" aims at strengthening the research capacities in Europe, including research infrastructures and e-infrastructures. Finally, "People" succeeds the p...

  13. SUNSTORE 3. Phase 1. Project design and tender. Final report; SUNSTORE 3. Fase 1. Projektering og udbud. Slutrapport

    Energy Technology Data Exchange (ETDEWEB)

    Soerensen, P.A. (PlanEnergi, Skoerping (Denmark)); Moeller Nielsen, C. (Dronninglund Fjernvarme, Dronninglund (Denmark)); Baunwall, M. (NIRAS Aalborg (Denmark)); Munkholt, H. (GG-Construction, Aalborg (Denmark)); Paaske, B. (Teknologisk Institut, AArhus (Denmark)); Schmidt, T. (SOLITES, Stuttgart (Germany))

    2011-03-15

    The objective of the project has been to carry out detailed design and tendering for a heat production plant consisting of: - 35.000 m{sub 2} solar thermal collectors, - 60.000 m{sub 3} pit heat storage, - 3 MW{sub heat} heat pump, covering app. 50% of the heat production at Dronninglund district heating plant (Denmark). The final report for the project includes detailed design of the pit heat storage (a further development of a 10.000 m{sub 3} storage implemented in Marstal) and simulation of the total production system in the simulation software TRNSYS. (ln)

  14. Sociocultural Transformation & Development. Good Practices or Successful Actions

    Directory of Open Access Journals (Sweden)

    Oriol Ríos

    2013-10-01

    Full Text Available The most disadvantadged neighborhoods in Europe have received funds from State Administration to eradicate social exclusion and overcome processes of urban ghettoization. These processes are being implemented in several social areas such as housing, employment, and education. Actions, defined as "good practices", are usually valued by the quantity and type and not by the quality and final outcomes they achieve. For example, when they improve the living conditions of the populations in these areas. The INCLUD-ED project shows positive results by replacing these "good practices" by "successful actions". They are grounded on scientific evidence in order to respond to the aims set by the neighbours of these disadvantaged neighborhoods.

  15. District heating rehabilitation project. Viljandi - Estonia. Final report

    International Nuclear Information System (INIS)

    1998-04-01

    The main objective of the project has been to assist Viljandi Municipality with the rehabilitation of their district heating system, and thereby to support the positive development of the district heating system in Viljandi to a more energy efficient and rational system and to achieve a significantly decrease in the pollution from the production of heat energy in Viljandi. The project has also included technical assistance to Viljandi DH company, in order to make them capable of operation and maintaining of the new substations, and also training of the local operational staff for operation of the complete district heating system. Viljandi is a county and is centrally located in Estonia, which makes Viljandi very suitable as recipient for a demonstration project. One important objective was the projects significantly positive environmental impact in reduction of the generated emissions of CO 2 , NO x and SO 2 , as the project includes installation of more efficient energy systems and supply of heat from the 2 existing district heating plants (both are partly fired with wood chips) instead of heating by very old and worn-out coal fired boilers and inexpedient designed substations with the present operational conditions. (EG)

  16. District heating rehabilitation project. Viljandi - Estonia. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    The main objective of the project has been to assist Viljandi Municipality with the rehabilitation of their district heating system, and thereby to support the positive development of the district heating system in Viljandi to a more energy efficient and rational system and to achieve a significantly decrease in the pollution from the production of heat energy in Viljandi. The project has also included technical assistance to Viljandi DH company, in order to make them capable of operation and maintaining of the new substations, and also training of the local operational staff for operation of the complete district heating system. Viljandi is a county and is centrally located in Estonia, which makes Viljandi very suitable as recipient for a demonstration project. One important objective was the projects significantly positive environmental impact in reduction of the generated emissions of CO{sub 2}, NO{sub x} and SO{sub 2}, as the project includes installation of more efficient energy systems and supply of heat from the 2 existing district heating plants (both are partly fired with wood chips) instead of heating by very old and worn-out coal fired boilers and inexpedient designed substations with the present operational conditions. (EG)

  17. Final report of the decontamination and decommission of Building 31 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Krabacher, J.E.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Radiological contamination was identified in Building 31 and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This area was addressed in the summary final report of the remediation of the exterior areas of the GJPO facility. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  18. DIPLOMA PROJECT TEAM WORK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    V. S. Kruglyk

    2014-04-01

    Full Text Available During the work performance students should get the maximal approach to the process of real project execution, so the project should include the need to use the latest technology, integration of data or services with different developments, architecture design, interaction of the team members and others. Implementation of graduation projects is the useful activity for the acquisition and consolidation of key IT competencies. Since the task of educational projects is maximal close to real one, students participate almost in all typical stages of commercial product’s development, and do so successfully. This is also confirmed practically: students, who were actively engaged in some projects at the university, have key positions in IT companies of the city and country after that. The main objective of the paper is to describe the organization of a common group students’ work on a degree project, implementation peculiarity of such projects, recommendations for improving the quality of projects. Thus, the paper is devoted to the peculiarities of the joint students’ work on a project during diploma execution in IT specialties, as the final part of the acquisition and consolidation process of key IT competencies of future programmers. The problem of choosing work topic, project concept, work organization in a group, implementation process organization has been considered. Also the specific stages of software development have been considered: development of interface, choice of technology, product quality, project disposal to the next developers, project completion.

  19. Development of a criticality alarm system neutron detector: Final project report

    International Nuclear Information System (INIS)

    O'Dell, A.A.

    1989-05-01

    The primary objective of this project was to develop a prototype neutron detector for use in criticality alarm systems (CASs) at US Department of Energy (DOE) and contractor facilities wherever significant amounts of fissile material are processed or stored. Constraints placed on the design of the detector were that the overall size of the detector was to be as small as practical, the input voltage requirements were to be no more than 24 V, and that the gamma sensitivity would be as low as possible. Also, the detector should give dosimetric neutron response, and should have sufficient temporal capabilities to measure the entire range from fast (>1 ms) to slow (seconds to minutes) excursions, and sufficient dynamic range to measure from background to over 100 times background levels to insure proper activation of the Immediate Evacuation Alarm (IEA). Finally, the detector should insure rapid (<1 s) activation of the IEA in the event of a criticality excursion. 24 figs., 11 tabs

  20. Final report Hanford environmental compliance project 89-D-172

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-01-01

    The Hanford Environmental Compliance (HEC) Project is unique in that it consisted of 14 subprojects which varied in project scope and were funded from more that one program. This report describes the HEC Project from inception to completion and the scope, schedule, and cost of the individual subprojects. Also provided are the individual subproject Cost closing statements and Project completion reports accompanied by construction photographs and illustrations

  1. IPPs in Sub-Saharan Africa: Determinants of success

    International Nuclear Information System (INIS)

    Eberhard, Anton; Gratwick, Katharine Nawaal

    2011-01-01

    This study analyses the outcomes of independent power projects (IPPs) across Sub-Saharan Africa. Approximately 20 such projects have taken root to date, concentrated mainly in 8 countries. A suite of country level and project level factors play a critical role in determining project success, chief among them: the manner in which planning, procurement and contracting are coherently linked, the role of development finance institutions along with the development origins of firms and credit enhancements. - Highlights: → We analyse the outcomes of independent power projects (IPPs) across Sub-Saharan Africa. → Approximately 20 IPPs have taken root to date, concentrated mainly in 8 countries. → A suite of country level and project level factors play a critical role in determining project success. → Key success factors are the coherence of planning, procurement and contracting. → Also important is the role of DFIs, the development origins of firms, and credit enhancements.

  2. Project-based fieldwork: perspectives of graduate entry students and project sponsors.

    Science.gov (United States)

    Fortune, Tracy; McKinstry, Carol

    2012-08-01

    This article builds on an earlier viewpoint regarding the need for project-focussed fieldwork. It presents the findings of an evaluative study into the value of project placements undertaken by final year graduate entry master's students as part of a capstone subject. The authors argue that provision of project placements enable impending graduates to develop and implement macro level strategies to develop prevention, resource and service development skills often required of contemporary occupational therapy practitioners. A qualitative approach is adopted. Student cohorts from 2005 and 2006 completed open-ended, written questionnaires, and agency project sponsors were interviewed to obtain their perspectives of the project placement experience. Despite some concern that project placements might be undertaken at the expense of 'clinical' placements these findings reveal that projects managed by students were perceived by services to add great value enabling them to advance important priorities. Students and sponsors highlighted a range of positive learning outcomes, including the ability to work collaboratively with supervisors and develop advanced communication skills and political acumen. The success of such placements depends on supportive supervision from academic staff. CONCLUSIONS AND SIGNIFICANCE OF THE STUDY: The findings promote project placements as a highly authentic aspect of work integrated learning enabling learners to draw together a range of attributes that support the ability to manage complex issues that have occupational relevance at a macro level. In addition, such experiences help learners to develop agency and political acumen both increasingly important capabilities for the contemporary workplace. © 2012 The Authors Australian Occupational Therapy Journal © 2012 Occupational Therapy Australia.

  3. Successful projects subsidized by the ROB-programme; Succesvolle ROB-gesubsidieerde projecten

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-03-15

    In the past years the Dutch program Reduction Other Greenhouse Gases (ROB) focused on the enhancement, development and implementation of measures aimed at reducing emissions of non-CO2 greenhouse gases. The main focus was directed to agriculture. Cooling and landfills. SenterNovem (currently named NL Agency) offered options for subsidies, knowledge and advice to start working on the reduction of non-CO2 greenhouse gases. A few examples of successful projects financed by ROB subsidy are briefly discussed. [Dutch] Het programma Reductie Overige Broeikasgassen (ROB) richtte zich de afgelopen jaren op het bevorderen, ontwikkelen en toepassen van maatregelen ter vermindering van de uitstoot van niet-CO2 broeikasgassen. De aandacht ging hierbij vooral uit naar de emissies van overige broeikasgassen afkomstig uit de landbouw, koeling en stortplaatsen. SenterNovem (nu het Agentschap NL) bood subsidiemogelijkheden, kennis en advies om met de reductie van niet-CO2 broeikasgassen aan de slag te gaan. Een paar voorbeelden van succesvolle projecten die met ROB-subsidies zijn gefinancierd worden in dit artikel kort besproken.

  4. Final report for project "Next-Generation Semiconductors for Solar Photoelectrolysis"

    Energy Technology Data Exchange (ETDEWEB)

    Khalifah, Peter [Stony Brook Univ., NY (United States)

    2016-09-15

    In this paper, effective methods have been developed for preparing high-quality LaTiO2N films on conductive La5Ti5O17 substrates that can serve as photoanodes for photoelectrochemical water oxidation. One paper has been written by the post-doc who completed this comprehensive, interdisciplinary study, and it is presently being finalized for submission. Our approach to this system integrates expertise that we have developed in single crystal growth, thin film growth, and thin film post-processing. Through this work, LTON films have been fully optimized for light harvesting, as their band gap is optimally matched with the incident solar spectrum and the film thicknesses have been optimized based on the absolute absorption coefficients that we have measured for this system. The next step is to optimize the co-catalyst functionalization and the solution conditions to maximize the catalytic activity for water oxidation. Since the preliminary tests described here were done without a water oxidation co-catalyst, and since good water oxidation catalysts have previously been identified based on studies of powder samples, this next step is highly likely to be successful.

  5. The art of implosions has impacted the success of three decontamination and decommissioning projects at Fernald

    International Nuclear Information System (INIS)

    Borgman, T.D.

    1997-01-01

    The Department of Energy (DOE) at the Fernald Environmental Management Project (FEMP), near Cincinnati, Ohio, has successfully impacted the safety, cost and schedule goals of the Decontamination and Dismantling (D ampersand D) Program by using the art of implosions. An implosion is the act of bringing a structure down in a well planned and directed manner using explosive materials. Three major structures in three separate projects were imploded using this well known commercial technology. Safety is, and will always be, the major consideration with each of the projects. As each project succeeded another, the work process used new and improved methods to lower the risk to the environment, provide a safer workplace by reducing the exposure of high risk work and reducing the spread of lead, asbestos and radioactive materials. The time frame for dismantlement of the steel structures was greatly improved, thus reducing the total project cost. The lessons learned were incorporated from one project to another, to continually improve the work process. A number of alternatives were considered for the removal of the structures, seven, four and three stories in height. The subcontractor and its demolition sub-tier contractor worked in a fixed price lump sum contract environment. While skeptical at first, the subcontractor realized the benefits of the technology, a win-win situation for all participants. The overall planning of each of the events was tied to the needs of the client (DOE), the stakeholders and the community surrounding the site, and the continuing progress at the Fernald site. The recording and application of several key lessons learned in the sequence of implosions, will be the key issues of interest in this paper. Each project offered interesting opportunities for contingency planning, coordination, safety culture adjustments, and high regard for the protection of surrounding structures

  6. The art of implosions has impacted the success of three decontamination and decommissioning projects at Fernald

    Energy Technology Data Exchange (ETDEWEB)

    Borgman, T.D.

    1997-12-01

    The Department of Energy (DOE) at the Fernald Environmental Management Project (FEMP), near Cincinnati, Ohio, has successfully impacted the safety, cost and schedule goals of the Decontamination and Dismantling (D&D) Program by using the art of implosions. An implosion is the act of bringing a structure down in a well planned and directed manner using explosive materials. Three major structures in three separate projects were imploded using this well known commercial technology. Safety is, and will always be, the major consideration with each of the projects. As each project succeeded another, the work process used new and improved methods to lower the risk to the environment, provide a safer workplace by reducing the exposure of high risk work and reducing the spread of lead, asbestos and radioactive materials. The time frame for dismantlement of the steel structures was greatly improved, thus reducing the total project cost. The lessons learned were incorporated from one project to another, to continually improve the work process. A number of alternatives were considered for the removal of the structures, seven, four and three stories in height. The subcontractor and its demolition sub-tier contractor worked in a fixed price lump sum contract environment. While skeptical at first, the subcontractor realized the benefits of the technology, a win-win situation for all participants. The overall planning of each of the events was tied to the needs of the client (DOE), the stakeholders and the community surrounding the site, and the continuing progress at the Fernald site. The recording and application of several key lessons learned in the sequence of implosions, will be the key issues of interest in this paper. Each project offered interesting opportunities for contingency planning, coordination, safety culture adjustments, and high regard for the protection of surrounding structures.

  7. Scintilla European project, the successful research results

    Energy Technology Data Exchange (ETDEWEB)

    Sannie, G.; Kondrasov, V.; Corre, G.; Boudergui, K.; Perot, B.; Carasco, C.; Montemont, G. [Commissariat a l' energie atomique et aux energies alternatives, Saclay, Cadarache, Grenoble (France); Peerani, P.; Carrapico, C.; Tomanin, A.; Rosas, F.; Caviglia, M.; Eklund, G.; Tagziria, H. [European Commission, Joint Research Centre, ITU, Nuclear Security Unit, Ispra (Italy); Friedrich, H.; Chmel, S. [Fraunhofer-Institut fuer Naturwissenschaftlich - Technische Trendanalysen - INT, Euskirchen (Germany); De Vita, R.; Manchini, E.; Pavan, M. [Istituto Nazionale di Fisica Nucleare, Sezione di Genova, Genova (Italy); Grattarola, M.; Botta, E. [Ansaldo Nucleare S.P.A, Genova (Italy); Kovacs, A.; Lakosi, L. [Hungarian Academy of Sciences, Centre for Energy Research, Budapest (Hungary); Baumhauer, C.; Deheuninck, T.; Haddad, E. [ARTTIC, Paris (France); Petrossian, G.; Ferragut, A. [SAPHYMO, Massy (France); Dermody, G.; Crossingham, G. [Symetrica Security Ltd, Southampton (United Kingdom)

    2015-07-01

    The Scintilla FP7 project is ended in December 2014, the fruitful results of 3 years development and tests will be presented. SCINTILLA offers the capacity to finding a reliable alternative to Helium-3 based detection systems since the gas which is predominantly used in nuclear safeguards and security applications has now become very expensive, rare and nearly unavailable. SCINTILLA benchmarks results are based on international standards. Radiation Portal tests were carried out at the Joint Research Centre (JRC) in Ispra (Italy). The scintilla project addresses few mains issues. The first is to develop neutron detectors for Radiation Portal Monitor (RPM) and the second is the need of new wearable integrated solutions for Spectrometric Personal Radiation Monitor (SPRM). The partners which provide technical systems of the scintilla project are INFN-ANSALDO, CEA, SYMETRICA and SAPHYMO. For RPM, the objective is to find reliable alternatives to Helium-3 historical neutron detector and provide technical solutions which cope with tests for reliable mobile and cost effective. For Spectrometric Personal Radiation Monitor (SPRM), SCINTILLA is innovating in technology areas that offer complementary capabilities for detecting and identifying gamma, Two CZT (Cadmium Zinc Telluride) addressing contexts of used by first responder technologies, one is a wearable detector and the second is a gamma camera complemented by advanced image processing technologies. (authors)

  8. Final rapid reactivation project environmental assessment

    International Nuclear Information System (INIS)

    1999-01-01

    The US Department of Energy (DOE) has prepared an environmental assessment (EA) for the Rapid Reactivation Project at Sandia National Laboratories, New Mexico. The EA analyzes the potential effects of a proposal to increase production of neutron generators from the current capability of 600 units per year up to 2,000 units per year. The project would use existing buildings and infrastructure to the maximum extent possible to meet the additional production needs. The increased production levels would necessitate modifications and additions involving a total area of approximately 26,290 gross square feet at Sandia National Laboratories, New Mexico, Technical Area 1. Additional production equipment would be procured and installed. The no-action alternative would be to continue production activities at the current capability of 600 units per year. The EA analyzes effects on health, safety, and air quality, resulting from construction and operation and associated cumulative effects. A detailed description of the proposed action and its environmental consequences is presented in the EA

  9. Mismanagement Reasons of the Projects Execution Phase

    Directory of Open Access Journals (Sweden)

    Hatem Khaleefah Al-Agele

    2017-10-01

    Full Text Available The execution phase of the project is most dangerous and the most drain on the resources during project life cycle, therefore, its need to monitor and control by specialists to exceeded obstructions and achieve the project goals. The study aims to detect the actual reasons behind mismanagement of the execution phase. The study begins with theoretical part, where it deals with the concepts of project, project selection, project management, and project processes. Field part consists of three techniques: 1- brainstorming, 2- open interviews with experts and 3- designed questionnaire (with 49 reason. These reasons result from brainstorming and interviewing with experts., in order to find the real reasons behind mismanagement of the execution phase. The most important reasons which are negatively impact on management of the execution phase that proven by the study were (Inability of company to meet project requirements because it's specialized and / or large project, Multiple sources of decision and overlap in powers, Inadequate planning, Inaccurate estimation of cost, Delayed cash flows by owners, Poor performance of project manager, inefficient decision making process, and the Negative impact of people in the project area. Finally, submitting a set of recommendations which will contribute to overcome the obstructions of successful management of the execution phase.

  10. A comprehensive framework for successful Nuclear New Build delivery

    International Nuclear Information System (INIS)

    Jimenez, Rafael J.

    2014-01-01

    This paper first addresses the concept of success, the factors which favours it and the best way in which these critical success factors should be embedded in the whole process of developing a new nuclear power plant (NPP). Taking as basic references the accumulated experience and lessons learnt from the past, the most recent developments and the relevant life-cycle criteria to measure the success of a project, the paper pass review to the different phases and stages of the nuclear power plant, highlighting the main areas of work and issues to be addressed, from the early days of its conception to its final closing and decommissioning. The purpose is not to enter into a high-level of detail in any particular aspect of project but to offer a quick 'all-in-one-glance' look at all the essential building-blocks and key drivers in the delivery of a new nuclear project, making sure that the framework touches on all the key concepts, check-lists, areas to work on, tools and issues to be addressed and presents them together as part of a comprehensive and cohesive picture. The aim would be to offer a very practical guide that did not miss any relevant part. Once the project (or programme) team gets a good grasp of the framework, and depending of the starting point and particular challenges for each project, the model will demand more or less focus in certain topics and it will be just a question of entering into as much level of detailed and granularity as needed. Developing a nuclear new build project is always a very ambitious enterprise. It is a venture we have to be humble about, thinking, planning and acting with maximum rigour, cautiousness and professionalism, not underestimating its 'grey zones' and certainly not overestimating our capabilities. It is a long term challenging journey, not precisely exempt of risks, obstacles and uncertainties, but a very thrilling and rewarding one worth the effort. Its successful outcome translates into many and

  11. Legacy sample disposition project. Volume 2: Final report

    International Nuclear Information System (INIS)

    Gurley, R.N.; Shifty, K.L.

    1998-02-01

    This report describes the legacy sample disposition project at the Idaho Engineering and Environmental Laboratory (INEEL), which assessed Site-wide facilities/areas to locate legacy samples and owner organizations and then characterized and dispositioned these samples. This project resulted from an Idaho Department of Environmental Quality inspection of selected areas of the INEEL in January 1996, which identified some samples at the Test Reactor Area and Idaho Chemical Processing Plant that had not been characterized and dispositioned according to Resource Conservation and Recovery Act (RCRA) requirements. The objective of the project was to manage legacy samples in accordance with all applicable environmental and safety requirements. A systems engineering approach was used throughout the project, which included collecting the legacy sample information and developing a system for amending and retrieving the information. All legacy samples were dispositioned by the end of 1997. Closure of the legacy sample issue was achieved through these actions

  12. Key performance indicators for project success on innovative building technology projects

    CSIR Research Space (South Africa)

    Mphahlele, Cathy

    2015-12-01

    Full Text Available unconventional building methods can only be deemed to satisfy by way of rational design or Agrèment certification”. Delivering projects through IBTs has introduced a construction environment that has different procurement, supply chain management, building...

  13. US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36 was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  14. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52 was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  15. Solutions for Digital Video Transmission Technology Final Report CRADA No. TC02068.0

    Energy Technology Data Exchange (ETDEWEB)

    Smith, A. T. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Rivers, W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-09-07

    This Project aimed at development of software for seismic data processing based on the Geotool code developed by the American company Multimax., Inc. The Geotool code was written in early 90-es for the UNIX platform. Under Project# 2821, functions of the old Geotool code were transferred into a commercial version for the Microsoft XP and Vista platform with addition of new capabilities on visualization and data processing. The developed new version of the Geotool+ was implemented using the up-to-date tool Microsoft Visual Studio 2005 and uses capabilities of the .NET platform. C++ was selected as the main programming language for the Geotool+. The two-year Project was extended by six months and funding levels increased from 600,000 to $670,000. All tasks were successfully completed and all deliverables were met for the project even though both the industrial partner and LLNL principal investigator left the project before its final report.

  16. Maine Project against Bullying. Final Report.

    Science.gov (United States)

    Saufler, Chuck; Gagne, Cyndi

    Noting that bullying among primary school-age children has become recognized as an antecedent to more violent behavior in later grades, the 3-year Maine Project Against Bullying examined currently available research on bullying and evaluated books, curricula, media materials, and programs to identify resources and strategies which can be applied…

  17. Alpena Community College Workplace Partnership Project. Final Report.

    Science.gov (United States)

    Alpena Community Coll., MI.

    This document consists of materials produced during the Workplace Partnership Project (WPP), a National Workplace Literacy Program-funded workplace literacy partnership between Alpena Community College (ACC) in Alpena, Michigan, and area businesses. Presented first is a personal reflection in which the project director shares some of the lessons…

  18. Business Intelligence Success Factors

    DEFF Research Database (Denmark)

    Gaardboe, Rikke; Jonasen, Tanja Svarre

    2018-01-01

    Business intelligence (BI) is a strategically important practice in many organizations. Several studies have investigated the factors that contribute to BI success; however, an overview of the critical success factors (CSFs) involved is lacking in the extant literature. We have integrated...... 34 CSFs related to BI success. The distinct CSFs identified in the extant literature relate to project management skills (13 papers), management support (20 papers), and user involvement (11 papers). In the articles with operationalized BI success, we found several distinct factors: system quality...

  19. Spray casting project final report

    International Nuclear Information System (INIS)

    Churnetski, S.R.; Thompson, J.E.

    1996-08-01

    Lockheed Martin Energy Systems, Inc. (Energy Systems), along with other participating organizations, has been exploring the feasibility of spray casting depleted uranium (DU) to near-net shape as a waste minimization effort. Although this technology would be useful in a variety of applications where DU was the material of choice, this effort was aimed primarily at gamma-shielding components for use in storage and transportation canisters for high-level radioactive waste, particularly in the Multipurpose Canister (MPC) application. In addition to the waste-minimization benefits, spray casting would simplify the manufacturing process by allowing the shielding components for MPC to be produced as a single component, as opposed to multiple components with many fabrication and assembly steps. In earlier experiments, surrogate materials were used to simulate the properties (specifically reactivity and density) of DU. Based on the positive results from those studies, the project participants decided that further evaluation of the issues and concerns that would accompany spraying DU was warranted. That evaluation occupied substantially all of Fiscal Year 1995, yielding conceptual designs for both an intermediate facility and a production facility and their associated engineering estimates. An intermediate facility was included in this study to allow further technology development in spraying DU. Although spraying DU to near-net shape seems to be feasible, a number of technical, engineering, and safety issues would need to be evaluated before proceeding with a production facility. This report is intended to document the results from the spray-casting project and to provide information needed by anyone interested in proceeding to the next step

  20. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  1. Research Applications for Teaching (RAFT) Project. Final Report.

    Science.gov (United States)

    Thomson, James R., Jr.; Handley, Herbert M.

    A report is given of the development and progress of the Research Applications for Teaching (RAFT) project, developed at Mississippi State University. Based upon research findings relative to effective teaching and effective schooling, five curriculum modules were prepared and implemented in instruction. In the second year of the project the…

  2. Successes and Experiences of the WIPP Project

    International Nuclear Information System (INIS)

    Chu, Margaret S.Y.; Weart, Wendell D.

    2000-01-01

    In May 1998, the US Environmental Agency (EPA) certified the US Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) as being in compliance with all of the applicable regulations governing the permanent disposal of spent nuclear fuel, high-level waste, and transuranic radioactive waste. The WIPP, a transuranic waste repository, is the first deep geologic repository in the US to have successfully demonstrated regulatory compliance with long-term radioactive waste disposal regulations and be certified to receive wastes. Many lessons were learned throughout the 25-year history of the WIPP--from site selection to the ultimate successful certification. The experiences and lessons learned from the WIPP may be of general interest to other repository programs in the world. The lessons learned include all facets of a repository program: programmatic, managerial, regulatory, technical, and social. This paper addresses critical issues that arose during the 25 years of WIPP history and how they influenced the program

  3. Environmentally-assisted cracking in austenitic light water reactor structural materials. Final report of the KORA-I project

    Energy Technology Data Exchange (ETDEWEB)

    Seifert, H.-P.; Ritter, S

    2009-03-15

    The following document is the final report of the KORA-I project, which was performed at the Paul Scherrer Institute (PSI) between 2006 and 2008 and was funded by the Swiss Nuclear Safety Inspectorate (ENSI). The three sub-projects of KORA-I covered the experimental characterisation of the effect of the reactor coolant environment on fatigue initiation and crack growth in austenitic stainless steels under boiling and pressurised water reactor conditions, the experimental evaluation of the potential and limits of the electrochemical noise measurement technique for the early detection of stress corrosion cracking initiation in austenitic stainless steels under boiling water reactor/normal water chemistry conditions, as well as the characterisation of the stress corrosion crack growth behaviour in the fusion line region of an Alloy 182-low-alloy reactor pressure vessel steel dissimilar metal weld. The main scientific results and major conclusions of the three sub-projects are discussed in three independent parts of this report. (author)

  4. Environmentally-assisted cracking in austenitic light water reactor structural materials. Final report of the KORA-I project

    International Nuclear Information System (INIS)

    Seifert, H.-P.; Ritter, S.

    2009-03-01

    The following document is the final report of the KORA-I project, which was performed at the Paul Scherrer Institute (PSI) between 2006 and 2008 and was funded by the Swiss Nuclear Safety Inspectorate (ENSI). The three sub-projects of KORA-I covered the experimental characterisation of the effect of the reactor coolant environment on fatigue initiation and crack growth in austenitic stainless steels under boiling and pressurised water reactor conditions, the experimental evaluation of the potential and limits of the electrochemical noise measurement technique for the early detection of stress corrosion cracking initiation in austenitic stainless steels under boiling water reactor/normal water chemistry conditions, as well as the characterisation of the stress corrosion crack growth behaviour in the fusion line region of an Alloy 182-low-alloy reactor pressure vessel steel dissimilar metal weld. The main scientific results and major conclusions of the three sub-projects are discussed in three independent parts of this report. (author)

  5. Development of TRU transmuters for optimization of the global fuel cycle. Final Report for the NERI Project

    International Nuclear Information System (INIS)

    Lee, John C.

    2009-01-01

    This final report summarizes the research activities during the entire performance period of the NERI grant, including the extra 9 months granted under a no-cost time extension. Building up on the 14 quarterly reports submitted through October 2008, we present here an overview of the research accomplishments under the five tasks originally proposed in July 2004, together with citations for publications resulting from the project. The AFCI-NERI project provided excellent support for two undergraduate and 10 graduates students at the University of Michigan during a period of three years and nine months. Significant developments were achieved in three areas: (1) Efficient deterministic fuel cycle optimization algorithms both for PWR and SFR configurations, (2) Efficient search algorithm for PWR equilibrium cycles, and (3) Simplified Excel-based script for dynamic fuel cycle analysis of diverse cycles. The project resulted in a total of 8 conference papers and three journal papers, including two that will be submitted shortly. Three pending publications are attached to the report

  6. Final report of the decontamination and decommissioning of Building 44 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial action contractor. Building 44 was radiologically contaminated and the building was demolished in 1994. The soil area within the footprint of the building was not contaminated; it complies with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  7. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    International Nuclear Information System (INIS)

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites

  8. Collaborative Computational Project for Electron cryo-Microscopy

    Energy Technology Data Exchange (ETDEWEB)

    Wood, Chris; Burnley, Tom [Science and Technology Facilities Council, Research Complex at Harwell, Didcot OX11 0FA (United Kingdom); Patwardhan, Ardan [European Molecular Biology Laboratory, Wellcome Trust Genome Campus, Hinxton, Cambridge CB10 1SD (United Kingdom); Scheres, Sjors [MRC Laboratory of Molecular Biology, Francis Crick Avenue, Cambridge Biomedical Campus, Cambridge CB2 0QH (United Kingdom); Topf, Maya [University of London, Malet Street, London WC1E 7HX (United Kingdom); Roseman, Alan [University of Manchester, Oxford Road, Manchester M13 9PT (United Kingdom); Winn, Martyn, E-mail: martyn.winn@stfc.ac.uk [Science and Technology Facilities Council, Daresbury Laboratory, Warrington WA4 4AD (United Kingdom); Science and Technology Facilities Council, Research Complex at Harwell, Didcot OX11 0FA (United Kingdom)

    2015-01-01

    The Collaborative Computational Project for Electron cryo-Microscopy (CCP-EM) is a new initiative for the structural biology community, following the success of CCP4 for macromolecular crystallography. Progress in supporting the users and developers of cryoEM software is reported. The Collaborative Computational Project for Electron cryo-Microscopy (CCP-EM) has recently been established. The aims of the project are threefold: to build a coherent cryoEM community which will provide support for individual scientists and will act as a focal point for liaising with other communities, to support practising scientists in their use of cryoEM software and finally to support software developers in producing and disseminating robust and user-friendly programs. The project is closely modelled on CCP4 for macromolecular crystallography, and areas of common interest such as model fitting, underlying software libraries and tools for building program packages are being exploited. Nevertheless, cryoEM includes a number of techniques covering a large range of resolutions and a distinct project is required. In this article, progress so far is reported and future plans are discussed.

  9. Collaborative Computational Project for Electron cryo-Microscopy

    International Nuclear Information System (INIS)

    Wood, Chris; Burnley, Tom; Patwardhan, Ardan; Scheres, Sjors; Topf, Maya; Roseman, Alan; Winn, Martyn

    2015-01-01

    The Collaborative Computational Project for Electron cryo-Microscopy (CCP-EM) is a new initiative for the structural biology community, following the success of CCP4 for macromolecular crystallography. Progress in supporting the users and developers of cryoEM software is reported. The Collaborative Computational Project for Electron cryo-Microscopy (CCP-EM) has recently been established. The aims of the project are threefold: to build a coherent cryoEM community which will provide support for individual scientists and will act as a focal point for liaising with other communities, to support practising scientists in their use of cryoEM software and finally to support software developers in producing and disseminating robust and user-friendly programs. The project is closely modelled on CCP4 for macromolecular crystallography, and areas of common interest such as model fitting, underlying software libraries and tools for building program packages are being exploited. Nevertheless, cryoEM includes a number of techniques covering a large range of resolutions and a distinct project is required. In this article, progress so far is reported and future plans are discussed

  10. Biorefinery Demonstration Project Final Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Lee, David [University of Georgia Research Foundation, Inc., Athens, GA (United States)

    2015-10-20

    In this project we focused on various aspects of biorefinery technology development including algal-biorefinery technology, thermochemical conversion of biomass to bio-oils and biochar; we tested characteristics and applications of biochars and evaluated nutrient cycling with wastewater treatment by the coupling of algal culture systems and anaerobic digestion. Key results include a method for reducing water content of bio-oil through atomized alcohol addition. The effect included increasing the pH and reducing the viscosity and cloud point of the bio-oil. Low input biochar production systems were evaluated via literature reviews and direct experimental work. Additionally, emissions were evaluated and three biochar systems were compared via a life cycle analysis. Attached growth systems for both algal cultivation and algal harvesting were found to be superior to suspended growth cultures. Nutrient requirements for algal cultivation could be obtained by the recycling of anaerobic digester effluents, thus experimentally showing that these two systems could be directly coupled. Twenty-two journal articles and six intellectual property applications resulted from the cumulative work that this project contributed to programmatically.

  11. The Workplace Literacy System Project (WLS). Final Performance Report.

    Science.gov (United States)

    Poulton, Bruce R.

    The Workplace Literacy System Project (WLS) prepared interactive CD-ROM discs containing about 50 hours of instruction and drill in basic skills presented within the context of the textile/apparel manufacturing industry. The project was conducted at a Sara Lee knit products plant in North Carolina. During the project, literacy task analyses were…

  12. Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

    International Nuclear Information System (INIS)

    Grecheck, Eugene S.; Batalo, David P.

    2010-01-01

    This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

  13. Project Aprendizaje. 1990-91 Final Evaluation Profile. OREA Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.

    An evaluation was done of New York City Public Schools' Project Aprendizaje, which served disadvantaged, immigrant, Spanish-speaking high school students at Seward Park High School in Manhattan. The Project enrolled 290 students in grades 9 through 12, 93.1 percent of whom were eligible for the Free Lunch Program. The Project provided students of…

  14. Project Ta-kos Outreach. Final Report.

    Science.gov (United States)

    Askew, Linda; And Others

    The Project Ta-kos Outreach program is an inservice training model designed to increase the probability that children (ages birth to 8) at risk for or with special needs and their families can access and receive appropriate services in order to remain an integral part of the community in which they reside. The program reflects an ecological…

  15. IRRSUD Project - Final report

    CERN Document Server

    Loyer, F

    2002-01-01

    IRRSUD is an irradiation facility which makes use of the low energy (0.5 MeV/n - 1 MeV/n) beams from the GANIL IRRSUD injectors. It is financed by the group GARI (Group of Ion Research Applications) and was established as a joint-venture of GANIL and CIRIL to develop the applied physics and ion based industrial applications. Among research directions framed by IRRSUD one can mention; the nano-technologies i.e. utilisation of the modifications induced in materials exposed to ion bombardment; realization of microporous membranes and low-D materials; aging of materials by irradiation. Also, the low energy ions issued from the injector matches very well the fission fragments in reactors. In addition IRRSUD could be used as testing facility for injectors.. The report is structured as follows: 1. Outline; 1.2. Project's main features; 1.3. Ion beam characterization; 2. Technical solutions; 2.1. Denominations; 2.2. Beam optics; 2.3. Beam bending magnets; 2.4. Beam instrumentation; 2.5. Current supply; 2.6. Vacuum sy...

  16. Successful project teams (in R&D environment)

    CSIR Research Space (South Africa)

    Giesler, Achmed

    2011-09-01

    Full Text Available management tools no longer give project teams a competitive edge - additional qualitative tools are required, following a systems approach. A paradigm shift away from the traditional triangle of budget, brief and time towards a stronger focus on people issues...

  17. Final report of Phase 1 of the project: Assistance in developing the management of the petroleum sector in Timor-Leste 2002 - 2008

    Energy Technology Data Exchange (ETDEWEB)

    2009-05-15

    This is an institutional cooperation programme between the Norwegian Petroleum Directorate and The Ministry of Natural Resources, Minerals and Energy Policy in Timor-Leste, funded by the Oil for Development programme from the Norwegian Agency for Development Cooperation (NORAD). This final report is required according to the Country Agreement (Appendix 1), Article VII, Section 5: - East Timor shall submit to Norway a final report within 6 months after the completion of the Project. The report shall give a summary of outputs and activities undertaken, achievements compared to Goal and Objective and an assessment of the efficiency of the Project.- This report summarizes the planning of the Project, the activities and outputs, shows how project funds have been spent and discusses the results of the project. It is hoped that it also functions as a history book for an important factor in the early development of Timor-Leste's petroleum sector and for this long and high profiled Norwegian Development project. For the period 2003-2006, the Implementing institution in Timor-Leste was The Ministry of Natural Resources, Minerals and Energy Policy. From 2007 and for the rest of the project-period, the implementing institution was changed to the Secretariat of State for Natural Resources. The main tasks for the cooperation project were: Training on petroleum tax, accounting and basic finance topics for staff in the Petroleum Tax Division, MOPF; Analyze and give advice on possible tax effects and revenue effects regarding PSA agreements, gas pipeline and the implementation of new consolidated tax law; Help establish regular meetings with DNPG/TSDA and MOF to discuss current issues and improve flow of information between the different Timor-Leste petroleum authorities; Conduct and give advice on tax audits and desk audits Identify and give advice on current petroleum tax issues; Designed spreadsheets to facilitate overall monitoring of petroleum tax payments; New tax return

  18. Do project management and network governance contribute to inter-organisational collaboration in primary care? A mixed methods study.

    Science.gov (United States)

    Schepman, Sanneke; Valentijn, Pim; Bruijnzeels, Marc; Maaijen, Marlies; de Bakker, Dinny; Batenburg, Ronald; de Bont, Antoinette

    2018-06-07

    The need for organisational development in primary care has increased as it is accepted as a means of curbing rising costs and responding to demographic transitions. It is only within such inter-organisational networks that small-scale practices can offer treatment to complex patients and continuity of care. The aim of this paper is to explore, through the experience of professionals and patients, whether, and how, project management and network governance can improve the outcomes of projects which promote inter-organisational collaboration in primary care. This paper describes a study of projects aimed at improving inter-organisational collaboration in Dutch primary care. The projects' success in project management and network governance was monitored by interviewing project leaders and board members on the one hand, and improvement in the collaboration by surveying professionals and patients on the other. Both qualitative and quantitative methods were applied to assess the projects. These were analysed, finally, using multi-level models in order to account for the variation in the projects, professionals and patients. Successful network governance was associated positively with the professionals' satisfaction with the collaboration; but not with improvements in the quality of care as experienced by patients. Neither patients nor professionals perceived successful project management as associated with the outcomes of the collaboration projects. This study shows that network governance in particular makes a difference to the outcomes of inter-organisational collaboration in primary care. However, project management is not a predictor for successful inter-organisational collaboration in primary care.

  19. W-519 Sagebrush Mitigation Project FY-2004 Final Review and Status

    Energy Technology Data Exchange (ETDEWEB)

    Durham, Robin E.; Sackschewsky, Michael R.

    2004-09-30

    This report summarizes activities conducted as mitigation for loss of sagebrush-steppe habitats due to Project W-519, the construction of the infrastructure for the Tank Waste Remediation System Vitrification Plant. The focus of this report is to provide a review and final status of mitigation actions performed through FY2004. Data collected since FY1999 have been included where appropriate. The Mitigation Action Plan (MAP) for Project W-519 prescribed three general actions to be performed as mitigation for the disturbance of approximately 40 ha (100 acres) of mature sagebrush-steppe habitat. These actions included: (1) transplanting approximately 130,000 sagebrush seedlings on the Fitzner-Eberhardt Arid Lands Ecology Reserve (ALE); (2) rectification of the new transmission line corridor via seeding with native grasses and sagebrush; and (3) research on native plant species with a goal of increasing species diversity in future mitigation or restoration actions. Nearly 130,000 Wyoming big sagebrush seedlings where planted on ALE during FY2000 and FY2001. About 39,000 of those seedlings were burned during the 24-Command Fire of June 2000. The surviving and subsequent replanting has resulted in about 91,000 seedlings that were planted across four general areas on ALE. A 50% survival rate at any monitoring period was defined as the performance standard in the MAP for this project. Data collected in 2004 indicate that of the over 5000 monitored plants, 51.1% are still alive, and of those the majority are thriving and blooming. These results support the potential for natural recruitment and the ultimate goal of wildlife habitat replacement. Thus, the basic performance standard for sagebrush survival within the habitat compensation planting has been met. Monitoring activities conducted in 2004 indicate considerable variation in seedling survival depending on the type of plant material, site conditions, and to a lesser extent, treatments performed at the time of planting

  20. W-519 Sagebrush Mitigation Project FY-2004 Final Review and Status

    International Nuclear Information System (INIS)

    Durham, Robin E.; Sackschewsky, Michael R.

    2004-01-01

    This report/SUMmarizes activities conducted as mitigation for loss of sagebrush-steppe habitats due to Project W-519, the construction of the infrastructure for the Tank Waste Remediation System Vitrification Plant. The focus of this report is to provide a review and final status of mitigation actions performed through FY2004. Data collected since FY1999 have been included where appropriate. The Mitigation Action Plan (MAP) for Project W-519 prescribed three general actions to be performed as mitigation for the disturbance of approximately 40 ha (100 acres) of mature sagebrush-steppe habitat. These actions included: (1) transplanting approximately 130,000 sagebrush seedlings on the Fitzner-Eberhardt Arid Lands Ecology Reserve (ALE); (2) rectification of the new transmission line corridor via seeding with native grasses and sagebrush; and (3) research on native plant species with a goal of increasing species diversity in future mitigation or restoration actions. Nearly 130,000 Wyoming big sagebrush seedlings where planted on ALE during FY2000 and FY2001. About 39,000 of those seedlings were burned during the 24-Command Fire of June 2000. The surviving and subsequent replanting has resulted in about 91,000 seedlings that were planted across four general areas on ALE. A 50% survival rate at any monitoring period was defined as the performance standard in the MAP for this project. Data collected in 2004 indicate that of the over 5000 monitored plants, 51.1% are still alive, and of those the majority are thriving and blooming. These results support the potential for natural recruitment and the ultimate goal of wildlife habitat replacement. Thus, the basic performance standard for sagebrush survival within the habitat compensation planting has been met. Monitoring activities conducted in 2004 indicate considerable variation in seedling survival depending on the type of plant material, site conditions, and to a lesser extent, treatments performed at the time of planting