WorldWideScience

Sample records for project status volume

  1. Network, system, and status software enhancements for the autonomously managed electrical power system breadboard. Volume 1: Project summary

    Science.gov (United States)

    Mckee, James W.

    1990-01-01

    This volume (1 of 4) gives a summary of the original AMPS software system configuration, points out some of the problem areas in the original software design that this project is to address, and in the appendix collects all the bimonthly status reports. The purpose of AMPS is to provide a self reliant system to control the generation and distribution of power in the space station. The software in the AMPS breadboard can be divided into three levels: the operating environment software, the protocol software, and the station specific software. This project deals only with the operating environment software and the protocol software. The present station specific software will not change except as necessary to conform to new data formats.

  2. Nuclear power. Volume 2. Nuclear power project management

    International Nuclear Information System (INIS)

    Pedersen, E.S.

    1978-01-01

    NUCLEAR POWER PLANT DESIGN is intended to be used as a working reference book for management, engineers and designers, and as a graduate-level text for engineering students. The book is designed to combine theory with practical nuclear power engineering and design experience, and to give the reader an up-to-date view of the status of nuclear power and a basic understanding of how nuclear power plants function. Volume 2 contains the following chapters: (1) review of nuclear power plants; (2) licensing procedures; (3) safety analysis; (4) project professional services; (5) quality assurance and project organization; (6) construction, scheduling, and operation; (7) nuclear fuel handling and fuel management; (8) plant cost management; and (9) conclusion

  3. Tri-State Synfuels Project Review: Volume 12. Fluor project status. [Proposed Henderson, Kentucky coal to gasoline plant; engineering

    Energy Technology Data Exchange (ETDEWEB)

    1982-06-01

    The purpose of this report is to document and summarize activities associated with Fluor's efforts on the Tri-State Synfuels Project. The proposed facility was to be coal-to-transport fuels facility located in Henderson, Kentucky. Tri-State Synfuels Company was participating in the project as a partner of the US Department of Energy per terms of a Cooperative Agreement resulting from DOE's synfuel's program solicitation. Fluor's initial work plan called for preliminary engineering and procurement services to the point of commitment for construction for a Sasol Fischer-Tropsch plant. Work proceeded as planned until October 1981 when results of alternative coal-to-methanol studies revealed the economic disadvantage of the Synthol design for US markets. A number of alternative process studies followed to determine the best process configuration. In January 1982 Tri-State officially announced a change from Synthol to a Methanol to Gasoline (MTG) design basis. Further evaluation and cost estimates for the MTG facility eventually led to the conclusion that, given the depressed economic outlook for alternative fuels development, the project should be terminated. Official announcement of cancellation was made on April 13, 1982. At the time of project cancellation, Fluor had completed significant portions of the preliminary engineering effort. Included in this report are descriptions and summaries of Fluor's work during this project. In addition location of key project data and materials is identified and status reports for each operation are presented.

  4. Status of APE projects

    CERN Document Server

    Alfieri, R; Onofri, E; Bartoloni, A; Battista, C; Cabibbo, Nicola; Cosimi, M; Lonardo, A; Michelotti, A; Proietti, B; Rapuano, F; Rossetti, D; Sacco, G; Tassa, S; Torelli, M; Vicini, P; Pène, O; Errico, W; Magazzù, G; Sartori, L; Schiiano, F; Tripiccione, R; De Riso, P; Petronzio, Roberto; Destri, C; Frezzotti, R; Marchesini, G; Gensch, Ulrich; Jansen, K; Kretzschmann, A; Leich, H; Paschedag, N; Pleiter, D; Schwendicke, U; Simma, H; Sommer, Rainer; Sulanke, K; Wegner, P; Fucci, A; Martin, B; Pech, J; Panizzi, E; Petricola, A

    2001-01-01

    This talk is divided in two parts. In the first part, we will summarize the status of the APEmille project that will be completed by the end of the year. We will then devote the rest of the talk to the description of a new project for a multi-TeraFlop machine, ape NEXT. The interested reader will find a much more detailed discussion of all the items touched upon here in the full proposal of the project that will shortly appear on hep-lat. (9 refs).

  5. Status of the apeNEXT project

    CERN Document Server

    Ammendola, R.; Boucaud, Philippe; Cabibbo, N.; Di Carlo, F.; De Pietri, R.; Di Renzo, F.; Errico, W.; Fucci, A.; Guagnelli, M.; Kaldass, H.; Lonardo, A.; de Luca, S.; Micheli, J.; Morenas, V.; Pene, O.; Petronzio, R.; Palombi, F.; Pleiter, D.; Paschedag, N.; Rapuano, F.; De Riso, P.; Rossetti, D.; Salamon, A.; Salina, G.; Sartori, L.; Schifano, F.; Simma, H.; Tripiccione, R.; Vicini, P.; Boucaud, Ph.; 10.1016/S0920-5632(03)01755-9

    2003-01-01

    We present the current status of the apeNEXT project. Aim of this project is the development of the next generation of APE machines which will provide multi-teraflop computing power. Like previous machines, apeNEXT is based on a custom designed processor, which is specifically optimized for simulating QCD. We discuss the machine design, report on benchmarks, and give an overview on the status of the software development.

  6. EBT-P project status report

    International Nuclear Information System (INIS)

    1983-11-01

    This Elmo Bumpy Torus Report describes the status of the EBT-P Project in September 1983 after phasedown of the Title II design effort. The report is intended to be a principle source of guidance in the event of a decision to resume work on the project

  7. Nuclear carrier business volume projections, 1980-2000

    International Nuclear Information System (INIS)

    Lebo, R.G.; McKeown, M.S.; Rhyne, W.R.

    1980-05-01

    The expected number of shipments of commodities in the nuclear fuel cycle are projected for the years 1980 thru 2000. Projections are made for: yellowcake (U 3 O 8 ); natural, enriched and reprocessed uranium hexafluoride (UF 6 ); uranium dioxide powder (UO 2 ); plutonium dioxide powder (PuO 2 ); fresh UO 2 and mixed oxide (MOX) fuel; spent UO 2 fuel; low-level waste (LLW); transuranic (TRU) waste; high-activity TRU waste; high-level waste (HLW), and cladding hulls. Projections are also made for non-fuel cycle commodities such as defense TRU wastes and institutional wastes, since they also are shipped by the commercial transportation industry. Projections of waste shipments from LWRs are based on the continuation of current volume reduction and solidification techniques now used by the utility industry. Projections are also made based on a 5% per year reduction in LWR waste volume shipped which is assumed to occur as a result of increased implementation of currently available volume reduction systems. This assumption results in a net 64% decrease in the total waste shipped by the year 2000. LWR waste shipment projections, and essentially all other projections for fuel cycle commodities covered in this report, are normalized to BWR and PWR generating capacity projections set forth by the Department of Energy (DOE) in their low-growth projection of April, 1979. Therefore these commodity shipment projections may be altered to comply with future changes in generating capacity projections. Projected shipments of waste from the reprocessing of spent UO 2 fuel are based on waste generation rates proposed by Nuclear Fuels Services, Allied-General Nuclear Services, Exxon Nuclear, and the DOE. Reprocessing is assumed to begin again in 1990, with mixed oxide fresh fuel available for shipment by 1991

  8. Real options and volume uncertainty by field development projects

    International Nuclear Information System (INIS)

    Ekern, S.; Stensland, G.

    1993-12-01

    The report concerns a study on the use of option methodology in field development projects. The report shows how the value of flexibility in the different decision processes is to be found by means of real option methodology. Particular attention is laid on the uncertainty concerning the volume of reserves and production capacity. The results from the study were based on the research project dubbed ''Use of real options in field development projects''. The project is partially connected to another project dubbed ''Decisive behaviour and alternative action under uncertainty in the petroleum sector''. Main topics cover as follow: Example with volume uncertainty; real options and volume uncertainty; gradual disclosure of uncertainty in the production; value of flexible production equipment. 33 refs., 19 figs., 17 tabs

  9. Status of CSNS project

    International Nuclear Information System (INIS)

    Zhang, J.; Fu, S.N.; Chen, H.S.

    2015-01-01

    The China Spallation Neutron Source (CSNS) accelerator is designed to accelerate proton beam pulses to 1.6 GeV at 25 Hz repetition rate, striking a solid metal target to produce spallation neutrons. The accelerator provides a beam power of 100 kW on the target in the first phase and then 500 kW in the second phase by increasing the average beam intensity 5 times while raising the linac output energy. The project construction has been formally launched in 2011 and it is planned to complete the project in March 2018. It is one of the high intensity proton accelerator projects in the world and it imposes a great challenge to Chinese accelerator community. This presentation will cover the status and challenges of the CSNS project. (author)

  10. 2. status colloquium of the project 'Applied ecology' (PAOe). Proceedings

    International Nuclear Information System (INIS)

    Breitenstein, A.; Scholz, W.; Waitzmann, M.; Zelesny, H.

    1994-01-01

    The 'Applied ecology' programme sponsors research on major subjects concerning application-oriented bases of nature conservation and environmental protection in the following sectors: 1. nature and landscape (succession research, scientific accompanying of measures restoring the natural condition of a landscape, nature conservation concepts and development of ecological paradigms); 2. ecotoxicology (further development and standardization of biological indication methods within the framework of the ecotoxicological register of effects of Baden-Wuertemberg, design of exposure models for forcasting long-term changes in Baden-Wuertemberg); 3. risk assessments and risk evaluations in environmental protection (selected ecological balances and development of ecological evaluation criteria).- On March 22nd and 23rd, 1994, the second status colloquium of the project ''Applied Ecology (PAOe)'' was held at Ettlingen. During this annual event, the results of 39 research projects in the above-mentioned major subject areas were presented and debated by 600 experts from science, administration and economy. This volume sums up the results of the research and demonstrates, at the same time, the range of the research projects sponsored under this scheme. (orig./VHE) [de

  11. The status of US Teraflops-scale projects

    International Nuclear Information System (INIS)

    Mawhinney, R.D.

    1995-01-01

    The current status of United States projects pursuing Teraflops-scale computing resources for lattice field theory is discussed. Two projects are in existence at this time: the Multidisciplinary Teraflops Project, incorporating the physicists of the QCD Teraflops Collaboration, and a smaller project, centered at Columbia, involving the design and construction of a 0.8Teraflops computer primarily for QCD. ((orig.))

  12. Quarterly status of Department of Energy projects

    International Nuclear Information System (INIS)

    1982-01-01

    This Quarterly Status of Department of Energy Projects is prepared by the Office of project and Facilities Management, MA-30. The report is designed to provide Department of Energy (DOE) management officials with a summary of the important baseline data that exists in the DOE project data base. This data base is maintained chiefly from periodic field management reports required by DOE Order 5700.4. Since most of the current estimates in this report are from field project managers, they do not necessarily have full Headquarters approval. The current budget data sheet estimates that appear in the report are considered appropriate for reporting external to the Department and reflect the President's FY 1983 Budget to Congress. Moneys allocated and estimated costs, and the construction status are tabulated for projects under the subject categories of: conservation and renewable energy; defense programs; environmental protection, safety and emergency preparedness; energy research; defense programs; nuclear energy; and management and administration

  13. Low-level radioactive waste in the northeast: revised waste volume projections

    International Nuclear Information System (INIS)

    1984-06-01

    The volume of low-level radioactive waste generated in the eleven Northeast states has undergone significant change since the inital 1982 analysis and projection. These revised projections incorporate improved data reporting and evidence of sharp declines in certain categories of waste. Volumes in the 1982-1983 period reflect waste shipped for disposal as reported by disposal site operators. Projected waste volumes represent waste intended for disposal. The recent dramatic changes in source reduction and waste management practices underscore the need for annual review of waste volume projections. The volume of waste shipped for off-site disposal has declined approximately 12% in two years, from an average 1,092,500 ft 3 annually in 1979 to 1981 to an average annual 956,500 ft 3 in 1982 to 1983; reactor waste disposal volumes declined by about 39,000 ft 3 or 7% during this period. Non-reactor waste volumes shipped for disposal declined by over 70,000 ft 3 or 15% during this period. The data suggest that generators increased their use of such management practices as source reduction, compaction, or, for carbon-14 and tritium, temporary storage followed by disposal as non-radioactive waste under the NRC de minimus standard effective March 1981. Using the Technical Subcommittee projection methodology, the volume of low-level waste produced annually in the eleven states, individually and collectively, is expected to increase through the year 2000, but at a significantly lower rate of increase than initially projected. By the year 2000, the Northeast is projected to generate 1,137,600 ft 3 of waste annually, an increase of about 20% over 1982 to 1983 average volume

  14. Multivariate volume visualization through dynamic projections

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Shusen [Univ. of Utah, Salt Lake City, UT (United States); Wang, Bei [Univ. of Utah, Salt Lake City, UT (United States); Thiagarajan, Jayaraman J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bremer, Peer -Timo [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pascucci, Valerio [Univ. of Utah, Salt Lake City, UT (United States)

    2014-11-01

    We propose a multivariate volume visualization framework that tightly couples dynamic projections with a high-dimensional transfer function design for interactive volume visualization. We assume that the complex, high-dimensional data in the attribute space can be well-represented through a collection of low-dimensional linear subspaces, and embed the data points in a variety of 2D views created as projections onto these subspaces. Through dynamic projections, we present animated transitions between different views to help the user navigate and explore the attribute space for effective transfer function design. Our framework not only provides a more intuitive understanding of the attribute space but also allows the design of the transfer function under multiple dynamic views, which is more flexible than being restricted to a single static view of the data. For large volumetric datasets, we maintain interactivity during the transfer function design via intelligent sampling and scalable clustering. As a result, using examples in combustion and climate simulations, we demonstrate how our framework can be used to visualize interesting structures in the volumetric space.

  15. Developing a stochastic traffic volume prediction model for public-private partnership projects

    Science.gov (United States)

    Phong, Nguyen Thanh; Likhitruangsilp, Veerasak; Onishi, Masamitsu

    2017-11-01

    Transportation projects require an enormous amount of capital investment resulting from their tremendous size, complexity, and risk. Due to the limitation of public finances, the private sector is invited to participate in transportation project development. The private sector can entirely or partially invest in transportation projects in the form of Public-Private Partnership (PPP) scheme, which has been an attractive option for several developing countries, including Vietnam. There are many factors affecting the success of PPP projects. The accurate prediction of traffic volume is considered one of the key success factors of PPP transportation projects. However, only few research works investigated how to predict traffic volume over a long period of time. Moreover, conventional traffic volume forecasting methods are usually based on deterministic models which predict a single value of traffic volume but do not consider risk and uncertainty. This knowledge gap makes it difficult for concessionaires to estimate PPP transportation project revenues accurately. The objective of this paper is to develop a probabilistic traffic volume prediction model. First, traffic volumes were estimated following the Geometric Brownian Motion (GBM) process. Monte Carlo technique is then applied to simulate different scenarios. The results show that this stochastic approach can systematically analyze variations in the traffic volume and yield more reliable estimates for PPP projects.

  16. HTGR accident initiation and progression analysis status report. Volume VIII. Responses to comments on AIPA status report

    Energy Technology Data Exchange (ETDEWEB)

    Raabe, P.H.

    1977-01-01

    The first seven volumes of the report series provide formal documentation of the status of the ERDA-sponsored Accident Initiation and Progression Analysis (AIPA) study as of the end of FY75. That portion of the report was given broad distribution to government agencies, industrial organizations, and academic institutions. Comments on the Status Report have been actively solicited from these and other organizations. The volume presented (the eighth in the AIPA Status Report) documents all of the formal written comments that have been received as of September 30, 1976, together with the responses to those comments. The comments as presented are direct quotations from the manuscripts as submitted by the reviewers; none have been paraphrased. The comments are presented in the same order as submitted by the reviewers and are generally addressed individually.

  17. HTGR accident initiation and progression analysis status report. Volume VIII. Responses to comments on AIPA status report

    International Nuclear Information System (INIS)

    Raabe, P.H.

    1977-01-01

    The first seven volumes of the report series provide formal documentation of the status of the ERDA-sponsored Accident Initiation and Progression Analysis (AIPA) study as of the end of FY75. That portion of the report was given broad distribution to government agencies, industrial organizations, and academic institutions. Comments on the Status Report have been actively solicited from these and other organizations. The volume presented (the eighth in the AIPA Status Report) documents all of the formal written comments that have been received as of September 30, 1976, together with the responses to those comments. The comments as presented are direct quotations from the manuscripts as submitted by the reviewers; none have been paraphrased. The comments are presented in the same order as submitted by the reviewers and are generally addressed individually

  18. Which echocardiographic parameter is a better marker of volume status in hemodialysis patients?

    Science.gov (United States)

    Sabaghian, Tahereh; Hajibaratali, Bahareh; Samavat, Shiva

    2016-11-01

    Bio-impedance analysis (BIA) is a preferred method for estimating the volume status. However, it cannot be utilized in daily practice. Since the assessment of the volume status is important and challenging for hemodialysis (HD) patients, the aim of study was to determine the volume status in chronic HD patients using echocardiographic parameters and assess its correlation with BIA. In this cross-sectional analysis, echocardiography and BIA were performed on 30 chronic HD patients 30 min before and 30 min after dialysis. All the cases of dialysis were performed in the middle of the week. This study also assessed the correlation between echocardiographic parameters and BIA parameters. There were significant differences between ECW, TBW, and TBW% (TBW/W) before and after HD. Significant differences were observed between echocardiographic parameters of IVCD, IVCDi min , IVCDi max before and after the HD. LVEDD, LVESD, LA area, mitral valve inflow, E/E', and IVRT, were improved after dialysis, too. There was a significant correlation between IVCDi min as an index of volume status, ECW% and TBW% before HD and IVCDi min change after dialysis had a significant correlation with %ECW change after dialysis. Comparison between hypertensive and non-hypertensive groups indicated IVCDi min was significantly lower in non-hypertensive group after dialysis. Our results showed a correlation between IVCDi min and BIA parameters before HD. So, it seems that IVCDi min can be a good parameter for determining the volume status of HD patients. However, further studies, with larger sample size and with a prospective study design, are required to confirm these results.

  19. The EEE Project status and perspectives

    CERN Document Server

    Antolini, R; Baldini Ferroli, R; Bencivenni, G; Blanco, F; Bressan, E; Chiavassa, A; Cifarelli, L; Cindolo, F; Coccia, E; De Pasquale, S; Di Giovanni, A; D'Incecco, M; Fabbri, F L; Garbini, M; Gustavino, C; Hatzifotiadou, D; Imponente, G; La Rocca, P; Librizzi, F; Menghetti, H; Miozzi, S; Pappalardo,G S; Piragino, G; Riggi, F; Sartorelli, G; Sbarra, C; Selvi, M; Williams, C; Zichichi, A

    2007-01-01

    The Extreme Energy Events (EEE) project plans to build and use an array of cosmic ray telescopes for muon detection, distributed over the italian territory. The use of such telescopes, based on Multigap Resistive Plate Chambers (MRPC) will allow the study of cosmic ray showers and the correlation between multiple primaries producing distant showers. The project is also intended to involve high school teams in an advanced research work. The physics items which can be addressed by such array, and the present status and perspectives of the project are here discussed.

  20. Low-level radioactive waste in the northeast: disposal volume projections

    International Nuclear Information System (INIS)

    1982-10-01

    The northeastern states, with support of the Coalition of Northeastern Governors (CONEG), are developing compact(s) for the disposal and management of low-level radioactive waste (LLRW) generated in the eleven northeastern states (Connecticut, Delaware, Maine, Maryland, Massachusetts, New Hampshire, New Jersey, New York, Pennsylvania, Rhode Island, and Vermont). The Technical Subcommittee has made a projection of future low-level radioactive waste to the year 2000 based on existing waste volume data and anticipated growth in the Northeast states. Aware of the difficulties involved with any long range projection - unforeseen events can drastically change projections based on current assumptions - the Technical Subcommittee believes that waste volume projections should be reviewed annually as updated information becomes available. The Technical Subcommittee made the following findings based upon a conservative projection methodology: volumes of low-level waste produced annually in the eleven states individually and collectively are expected to grow continually through the year 2000 with the rate of increase varying by state; by the year 2000, the Northeast is projected to generate 58,000 m 3 of low-level waste annually, about 1.9 times the current average; and based on current estimates, 47% of the total projected waste volume in the year 2000 will be produced by nuclear power plants, compared to the current average of 54%. Non-reactor wastes will equal 53% of the total in the year 2000 compared to the current 46%

  1. Technical Assistance in Evaluating Career Education Projects. Final Report. Volume I: Summary Volume.

    Science.gov (United States)

    Stenner, A. Jackson; And Others

    This document contains the first of five volumes reporting the activities and results of a career education evaluation project conducted to accomplish the following two objectives: (1) to improve the quality of evaluations by career education projects funded by the United States Office of Career Education (OCE) through the provision of technical…

  2. Project Radiation protection East. Status Report, July 1997

    Energy Technology Data Exchange (ETDEWEB)

    Snihs, J.O.; Sundewall, H.; Grapengiesser, S. [STEGRA Consultants (Sweden); Bennerstedt, T. [TeknoTelje (Sweden)

    1997-12-01

    Project Radiation Protection East is a Swedish program for radiation protection work in Central and Eastern Europe. The projects are assessed, planned and performed in close cooperation with partner organizations in the East. Since 1994 radiation protection cooperation concerning the former Soviet Navy training reactors in Paldiski, Estonia, is included in the project. This report presents a summary over some 140 projects, their status, allocated funds and their distribution over countries and project areas. 12 tabs.

  3. Pinon Pine IGCC project status

    International Nuclear Information System (INIS)

    Higginbotham, E.B.; Lamarre, L.J.; Glazer, M.

    1993-01-01

    Sierra Pacific Power Company (SPPCo) intends to build the Pinon Pine Power Project, an integrated coal gasification combined cycle (IGCC) plant at its Tracy Power Station near Reno, Nevada. The plant will burn approximately 800 tons of coal per day to generate electricity in a base load application. The Pinon Project was selected by the U.S. Department of Energy (DOE) for funding under Round IV of the Clean Coal Technology Program. The project will demonstrate the use of the KRW agglomerating fluidized bed gasifer operating in the air blown mode. Hot gas cleanup consisting of particulate and sulfur removal will also be demonstrated. The Cooperative Agreement between SPPCo and the DOE was executed in August 1992. Foster Wheeler USA Corporation (FWUSA) will provide engineering and construction management services. The M.W. Kellogg Company (MWK) will provide engineering of the gasifer and hot gas cleanup systems. A discussion of project progress since the 1992 Clean Coal Technology Conference, design and economic considerations, and current project status is presented

  4. Status of LMFBR development project in Japan

    International Nuclear Information System (INIS)

    Nagane, G.; Akebi, M.; Matsuno, Y.

    1987-01-01

    Initiation of the LMFBR development project in Japan was decided by the Atomic Energy Commission of Japan in 1966. In 1967, the Power Reactor and Nuclear Fuel Development Corporation (PNC) was established to realize the project as a part of its tasks of a wide scope covering all the reseatch and development activities concerning fuel cycle. In the present paper the status of experimental fast reactor (Joyo), which is the first milestone of the LMFBR project, prototype fast reactor (Monju) and R and D activities supporting the project including that for larger LMFBRs in the future is described. (author)

  5. Belene Nuclear Power Plant project status

    International Nuclear Information System (INIS)

    Nikolov

    2008-01-01

    The status of the Belene project with the following main features is described: Reactor type - PWR, Russian Design Plant supplier - ASE, AREVA NP/Siemens Reactor thermal power - 2 x 3012 MW Electric output -2 x 1060 MW Net efficiency - 35 % Capacity factor - 90 % Design Life Time - 60 years

  6. Status of the DIRAC Project

    International Nuclear Information System (INIS)

    Casajus, A; Ciba, K; Fernandez, V; Graciani, R; Hamar, V; Mendez, V; Poss, S; Sapunov, M; Stagni, F; Tsaregorodtsev, A; Ubeda, M

    2012-01-01

    The DIRAC Project was initiated to provide a data processing system for the LHCb Experiment at CERN. It provides all the necessary functionality and performance to satisfy the current and projected future requirements of the LHCb Computing Model. A considerable restructuring of the DIRAC software was undertaken in order to turn it into a general purpose framework for building distributed computing systems that can be used by various user communities in High Energy Physics and other scientific application domains. The CLIC and ILC-SID detector projects started to use DIRAC for their data production system. The Belle Collaboration at KEK, Japan, has adopted the Computing Model based on the DIRAC system for its second phase starting in 2015. The CTA Collaboration uses DIRAC for the data analysis tasks. A large number of other experiments are starting to use DIRAC or are evaluating this solution for their data processing tasks. DIRAC services are included as part of the production infrastructure of the GISELA Latin America grid. Similar services are provided for the users of the France-Grilles and IBERGrid National Grid Initiatives in France and Spain respectively. The new communities using DIRAC started to provide important contributions to its functionality. Among recent additions can be mentioned the support of the Amazon EC2 computing resources as well as other Cloud management systems; a versatile File Replica Catalog with File Metadata capabilities; support for running MPI jobs in the pilot based Workload Management System. Integration with existing application Web Portals, like WS-PGRADE, is demonstrated. In this paper we will describe the current status of the DIRAC Project, recent developments of its framework and functionality as well as the status of the rapidly evolving community of the DIRAC users.

  7. Status Report of Projects Activities at CERN

    CERN Document Server

    Missiaen, Dominique; Dobers, Tobias; Fuchs, Jean-Frederic; Gayde, Jean-Christophe; Jones, Mark; Mainaud Durand, Helene

    2014-01-01

    Besides the Long Shut-Down 1 (LS1), some projects are still progressing at CERN. Among them, it has to be mentioned LINAC4, a future essential part of the LHC injector chain, AWAKE, a project to verify the approach of using protons to drive a strong wakefield in a plasma, ELENA, a small compact ring for cooling and decelerating antiproton and HIE-Isolde, not to forget the long term studies for CLIC and FCC. This paper describes the status of these projects from the survey and alignment point of view.

  8. Fast Breeder Project status report, 1974

    International Nuclear Information System (INIS)

    Hueper, R.

    A compilation of the papers read at the Status Report of the Fast Breeder Project at the Karlsruhe Nuclear Research Center on March 26, 1974 is presented. The first papers present a general survey of the present state of research and development work performed by the German, Belgian, and Netherlands research centers on the SNR 300 Prototype Fast Breeder Reactor (Kalkar Nuclear Power Station), on the SNR follow-on program, alternative fuels and coolants and basic problems, on work performed by industry with respect to the licensing procedure and construction of the SNR 300, and on commissioning and the planned conversion of KNK, the Compact Sodium Cooled Nuclear Reactor. The detailed papers deal with results elaborated at the institutes of GfK Karlsruhe, SCK/CEN Mol, RCN Petten, and TNO Apeldoorn. Most of these efforts have been concentrated upon fuel pin and materials development and on the physics and safety of fast reactors. The status report concludes with a reference to the future program under the Project. (U.S.)

  9. Current status of the AUSTRON project

    International Nuclear Information System (INIS)

    Rauch, H.; Regler, M.; Lechner, R.E.; Weber, H.

    2001-01-01

    The current status of the AUSTRON spallation source project is described with reference to the need for neutrons in Europe and - due to a certain West-East imbalance of large research facilities - especially in Central Europe. A short overview about technical aspects of proton accelerator, rapid cycling synchrotron, storage ring, target and instrumentation is presented. (author)

  10. Baseline Projection Data Book: GRI baseline projection of U.S. Energy Supply and Demand to 2010. 1992 Edition. Volume 1 and Volume 2

    International Nuclear Information System (INIS)

    Holtberg, P.D.; Woods, T.J.; Lihn, M.L.; Koklauner, A.K.

    1992-01-01

    The 1992 Baseline Projection Data Book provides backup data in tabular form for the 1992 GRI Baseline Projection of U.S. Energy Supply and Demand to 2010. Summary tables and data for the residential, commercial, industrial, electric utility, and transportation sectors are presented in the volume

  11. Croatian repository construction project - present status and main obstacles

    International Nuclear Information System (INIS)

    Kucar Dragicevic, S.; Subasic, D.; Schaller, A.; Lokner, V.; Cerskov Klika, M.

    1999-01-01

    Croatia has been preparing backgrounds for the construction of the repository for low and intermediate radioactive waste on its territory, almost for a decade, now. In the name of Hrvtaska elektroprivreda, the co-owner of the NE Krsko, APO has been co-ordinating and organising numerous activities and projects during that time period. Siting process, safety assessment, disposal technology and repository design and public acceptance issues are the main fields of activities. The overall status of the project at the moment, including the overview of the present status of the main four aspects of activities, will be presented. Relatively, big and important progress made on the project work out during the last two years, as well as the main obstacles we were faced with during that time period, will be discussed.(author)

  12. Network, system, and status software enhancements for the autonomously managed electrical power system breadboard. Volume 4: Graphical status display

    Science.gov (United States)

    Mckee, James W.

    1990-01-01

    This volume (4 of 4) contains the description, structured flow charts, prints of the graphical displays, and source code to generate the displays for the AMPS graphical status system. The function of these displays is to present to the manager of the AMPS system a graphical status display with the hot boxes that allow the manager to get more detailed status on selected portions of the AMPS system. The development of the graphical displays is divided into two processes; the creation of the screen images and storage of them in files on the computer, and the running of the status program which uses the screen images.

  13. Effect of hydration status on atrial and ventricular volumes and function in healthy adult volunteers.

    Science.gov (United States)

    Schantz, Daryl I; Dragulescu, Andreea; Memauri, Brett; Grotenhuis, Heynric B; Seed, Mike; Grosse-Wortmann, Lars

    2016-10-01

    Assessment of cardiac chamber volumes is a fundamental part of cardiac magnetic resonance (CMR) imaging. While the effects of inter- and intraobserver variability have been studied and have a recognized effect on the comparability of serial cardiac MR imaging studies, the effect of differences in hydration status has not been evaluated. To evaluate the effects of volume administration on cardiac chamber volumes. Thirteen healthy adults underwent a baseline cardiac MR to evaluate cardiac chamber volumes after an overnight fast. They were then given two saline boluses of 10 ml/kg of body weight and the cardiac MR was repeated immediately after each bolus. From the baseline scan to the final scan there was a significant increase in all four cardiac chamber end-diastolic volumes. Right atrial volumes increased 8.0%, from 61.1 to 66.0 ml/m2 (PHydration status has a significant effect on the end-diastolic volumes of all cardiac chambers assessed by cardiac MR. Thus, hydration represents a "variable" that should be taken into account when assessing cardiac chamber volumes, especially when performing serial imaging studies in a patient.

  14. Status of LLNL granite projects

    International Nuclear Information System (INIS)

    Ramspott, L.D.

    1980-01-01

    The status of LLNL Projects dealing with nuclear waste disposal in granitic rocks is reviewed. This review covers work done subsequent to the June 1979 Workshop on Thermomechanical Modeling for a Hardrock Waste Repository and is prepared for the July 1980 Workshop on Thermomechanical-Hydrochemical Modeling for a Hardrock Waste Repository. Topics reviewed include laboratory determination of thermal, mechanical, and transport properties of rocks at conditions simulating a deep geologic repository, and field testing at the Climax granitic stock at the USDOE Nevada Test Site

  15. Integrated Data Base: Status and waste projections

    International Nuclear Information System (INIS)

    Klein, J.A.

    1990-01-01

    The Integrated Data Base (IDB) is the official US Department of Energy (DOE) data base for spent fuel and radioactive waste inventories and projections. DOE low-level waste (LLW) is just one of the many waste types that are documented with the IDB. Summary-level tables and figures are presented illustrating historical and projected volume changes of DOE LLW. This information is readily available through the annual IDB publication. Other presentation formats are also available to the DOE community through a request to the IDB Program. 4 refs., 6 figs., 5 tabs

  16. Aviation Safety Program: Weather Accident Prevention (WxAP) Project Overview and Status

    Science.gov (United States)

    Nadell, Shari-Beth

    2003-01-01

    This paper presents a project overview and status for the Weather Accident Prevention (WxAP) aviation safety program. The topics include: 1) Weather Accident Prevention Project Background/History; 2) Project Modifications; 3) Project Accomplishments; and 4) Project's Next Steps.

  17. Fuel Rod Consolidation Project: Phase 2, Final report: Volume 2, Appendices

    International Nuclear Information System (INIS)

    1987-01-01

    This document, Volume 2, provides the appendices to Volume 1 of the Fuel Rod Consolidation Project. It provides information on the following: References; Trade-off Studies; Instrument List; RAM Data; Fabrication Specifications; Software Specifications; and Design Requirements

  18. Computing the maximum volume inscribed ellipsoid of a polytopic projection

    NARCIS (Netherlands)

    Zhen, Jianzhe; den Hertog, Dick

    We introduce a novel scheme based on a blending of Fourier-Motzkin elimination (FME) and adjustable robust optimization techniques to compute the maximum volume inscribed ellipsoid (MVE) in a polytopic projection. It is well-known that deriving an explicit description of a projected polytope is

  19. Computing the Maximum Volume Inscribed Ellipsoid of a Polytopic Projection

    NARCIS (Netherlands)

    Zhen, J.; den Hertog, D.

    2015-01-01

    We introduce a novel scheme based on a blending of Fourier-Motzkin elimination (FME) and adjustable robust optimization techniques to compute the maximum volume inscribed ellipsoid (MVE) in a polytopic projection. It is well-known that deriving an explicit description of a projected polytope is

  20. European DataGrid project Status and plans

    CERN Document Server

    Kunszt, Peter Z

    2003-01-01

    The European DataGrid (EDG) project has reached, after 1.5 years, the middle of its lifetime. In this article we give an overview of the status, components, procedures and plans of the EDG project as of June 2002. The objective of the EDG project is to assist the next generation of scientific exploration, computation and analysis of large-scale data sets - from hundreds of terabytes to petabytes, across widely distributed scientific communities. The primary goal of the first phase of the EDG project was to assemble a distributed testbed to demonstrate that the EDG middleware components could be integrated into a production-quality computational Grid, as well as to gain experience with such a system. The very first version of the EDG testbed was deployed toward the end of 2001. At the first official European Union review of the project on March 1, 2002, it has been found that the project is on the right track to achieve its goals. Since then the EDG middleware, testbed components and procedures have been conti...

  1. Status of the AFP Project in ATLAS

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00224260; The ATLAS collaboration

    2017-01-01

    Status of the AFP project in the ATLAS experiment is given. In 2016 one arm of the AFP detector was installed and first data have been taken. In parallel with integration of the AFP subdetector into the ATLAS TDAQ nad DCS, beam tests and preparations for the installation of the 2nd arm are performed.

  2. Status Report Kuwait Nuclear Data Project

    Energy Technology Data Exchange (ETDEWEB)

    Farhan, A. [Kuwait Nuclear Data Center, Kuwait University, Kuwait (Kuwait)

    2013-08-15

    This report covers the Kuwaiti group's activities for the period April 2011 - January 2013. The Kuwait Group will continue its collaboration in order to fulfill its commitments. The Kuwait Nuclear Data Project has permanent responsibility for evaluating and updating ENSDF for A = 74 -80. The status of the mass chains is: - A = 74 (2006), - A = 75 (1999) {radical}, - A = 76 (1995) {radical}, - A = 77 (2012), - A = 78 (2009), - A = 79 (2002), - A = 80 (2005)

  3. Effect of hydration status on atrial and ventricular volumes and function in healthy adult volunteers

    Energy Technology Data Exchange (ETDEWEB)

    Schantz, Daryl I. [The Hospital for Sick Children, The Labatt Family Heart Centre in the Department of Paediatrics, Toronto, ON (Canada); University of Manitoba, Variety Children' s Heart Centre, Winnipeg, MB (Canada); Dragulescu, Andreea [The Hospital for Sick Children, The Labatt Family Heart Centre in the Department of Paediatrics, Toronto, ON (Canada); Memauri, Brett [University of Manitoba, Department of Radiology, St. Boniface General Hospital, Winnipeg, MB (Canada); Grotenhuis, Heynric B. [The Hospital for Sick Children, The Labatt Family Heart Centre in the Department of Paediatrics, Toronto, ON (Canada); Wilhelmina Children' s Hospital, Utrecht (Netherlands); Seed, Mike; Grosse-Wortmann, Lars [The Hospital for Sick Children, The Labatt Family Heart Centre in the Department of Paediatrics, Toronto, ON (Canada); The Hospital for Sick Children, Department of Diagnostic Imaging, Toronto, ON (Canada)

    2016-10-15

    Assessment of cardiac chamber volumes is a fundamental part of cardiac magnetic resonance (CMR) imaging. While the effects of inter- and intraobserver variability have been studied and have a recognized effect on the comparability of serial cardiac MR imaging studies, the effect of differences in hydration status has not been evaluated. To evaluate the effects of volume administration on cardiac chamber volumes. Thirteen healthy adults underwent a baseline cardiac MR to evaluate cardiac chamber volumes after an overnight fast. They were then given two saline boluses of 10 ml/kg of body weight and the cardiac MR was repeated immediately after each bolus. From the baseline scan to the final scan there was a significant increase in all four cardiac chamber end-diastolic volumes. Right atrial volumes increased 8.0%, from 61.1 to 66.0 ml/m2 (P<0.001), and left atrial volumes increased 10.0%, from 50.0 to 55.0 ml/m2 (P<0.001). Right ventricular volumes increased 6.0%, from 91.1 to 96.5 ml/m2 (P<0.001), and left ventricular volumes increased 3.2%, from 87.0 to 89.8 ml/m2 (P<0.001). Hydration status has a significant effect on the end-diastolic volumes of all cardiac chambers assessed by cardiac MR. Thus, hydration represents a ''variable'' that should be taken into account when assessing cardiac chamber volumes, especially when performing serial imaging studies in a patient. (orig.)

  4. Effect of hydration status on atrial and ventricular volumes and function in healthy adult volunteers

    International Nuclear Information System (INIS)

    Schantz, Daryl I.; Dragulescu, Andreea; Memauri, Brett; Grotenhuis, Heynric B.; Seed, Mike; Grosse-Wortmann, Lars

    2016-01-01

    Assessment of cardiac chamber volumes is a fundamental part of cardiac magnetic resonance (CMR) imaging. While the effects of inter- and intraobserver variability have been studied and have a recognized effect on the comparability of serial cardiac MR imaging studies, the effect of differences in hydration status has not been evaluated. To evaluate the effects of volume administration on cardiac chamber volumes. Thirteen healthy adults underwent a baseline cardiac MR to evaluate cardiac chamber volumes after an overnight fast. They were then given two saline boluses of 10 ml/kg of body weight and the cardiac MR was repeated immediately after each bolus. From the baseline scan to the final scan there was a significant increase in all four cardiac chamber end-diastolic volumes. Right atrial volumes increased 8.0%, from 61.1 to 66.0 ml/m2 (P<0.001), and left atrial volumes increased 10.0%, from 50.0 to 55.0 ml/m2 (P<0.001). Right ventricular volumes increased 6.0%, from 91.1 to 96.5 ml/m2 (P<0.001), and left ventricular volumes increased 3.2%, from 87.0 to 89.8 ml/m2 (P<0.001). Hydration status has a significant effect on the end-diastolic volumes of all cardiac chambers assessed by cardiac MR. Thus, hydration represents a ''variable'' that should be taken into account when assessing cardiac chamber volumes, especially when performing serial imaging studies in a patient. (orig.)

  5. The LHC Project Status and Prospects

    CERN Document Server

    Faugeras, Paul E

    2001-01-01

    The Large Hadron Collider (LHC), CERN's future major facility for high-energy physics, has entered into the construction and preparation for installation phases. After recalling briefly the main machine design choices and challenges, one will review the progress of civil works for the machine and experimental areas and the status of the main LHC components, which are presently series-built and for some of them procured in kind through world-wide collaborations. Report will also be given on the full-scale prototype of an elementary LHC lattice cell, called String 2, which is being commissioned and used for optimising the installation and testing procedures of the LHC. The size and duration of the LHC Project, its intrinsic complexity and the large number of world-wide collaborations involved require rather elaborate project management tools, which will be shortly described. Finally, following the extended running of the LEP and the delay for emptying of the machine tunnel, a new planning for project completion...

  6. Present status of the SRRC Project

    International Nuclear Information System (INIS)

    Chang, C.; Cheng, K.C.; Liu, Y.C.; Tseng, P.K.

    1985-01-01

    Upon the recommendation of the overseas Chinese scholars and the feasibility study group organized by the National Science Council, the government approved the establishment of the Synchrotron Radiation Research Center (SRRC) on July 9, 1983. The main goal of the SRRC project is to construct and operate an up-to-date 1 GeV synchrotron radiation source, with three beam lines for general experiments, in five to six years; to provide local scientists and returned scientists from abroad a facility to carry out frontier researches in both basic and applied science; and to elevate the technological capabilities of the related industries, universities, and research institutes through the construction of the machine. The background and present status of the project are discussed

  7. Development of organic sector. Status quo report Finland CoreOrganic Project HealthyGrowth: From niche to volume with integrity and trust. WP 2

    OpenAIRE

    Risku-Norja, Helmi

    2013-01-01

    Abstract. The present review on the development of the organic sector and on the status of the organic research in Finland has been compiled within the frame of the HealthyGrowth project. The numeric data are based on official statistics. The role of the government and the national goals and strategies were captured by analyzing about 20 relevant national policy documents. Regarding research, the focus was on the completed and on-going projects that deal with either policy, markets and consu...

  8. User's operating procedures. Volume 3: Projects directorate information programs

    Science.gov (United States)

    Haris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the scout project automatic data system, called SPADS is presented. SPADS is the results of the past seven years of software development on a prime mini-computer. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, three of three, provides the instructions to operate the projects directorate information programs in data retrieval and file maintenance via the user friendly menu drivers.

  9. Instantaneous Project Controls: Current Status, State of the Art, Benefits, and Strategies

    Science.gov (United States)

    Abbaszadegan, Amin

    2016-01-01

    Despite advancements in construction and construction-related technology, capital project performance deviations, typically overruns, remain endemic within the capital projects industry. Currently, management is generally unaware of the current status of their projects, and thus monitoring and control of projects are not achieved effectively. In…

  10. FY-1981 project status for the Transuranic Waste Treatment Facility

    International Nuclear Information System (INIS)

    Benedetti, R.L.; Tait, T.D.

    1981-11-01

    The primary objective of the Transuranic Waste Treatment Facility (TWTF) Project is to provide a facility to process low-level transuranic waste stored at the Idaho National Engineering Laboratory (INEL) into a form acceptable for disposal at the Waste Isolation Pilot Plant. This report provides brief summary descriptions of the project objectives and background, project status through FY-1981, planned activities for FY-1982, and the EG and G TWTF Project office position on processing INEL transuranic waste

  11. Guidance and Control Software Project Data - Volume 1: Planning Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the planning documents from the GCS project. Volume 1 contains five appendices: A. Plan for Software Aspects of Certification for the Guidance and Control Software Project; B. Software Development Standards for the Guidance and Control Software Project; C. Software Verification Plan for the Guidance and Control Software Project; D. Software Configuration Management Plan for the Guidance and Control Software Project; and E. Software Quality Assurance Activities.

  12. Comparison of Volume Status in Asymptomatic Haemodialysis and Peritoneal Dialysis Outpatients

    Directory of Open Access Journals (Sweden)

    Eugenia Papakrivopoulou

    2012-03-01

    Full Text Available Background: The majority of haemodialysis (HD patients gain weight between dialysis sessions and thereby become volume overloaded, whereas peritoneal dialysis (PD is a more continuous technique. Cardiovascular mortality and hypertension is increased with both treatment modalities. We therefore wished to compare volume status in PD and HD to determine whether PD patients are chronically volume overloaded, as a risk factor for cardiovascular mortality. Study Design, Setting and Participants:We retrospectively audited 72 healthy HD patients and 115 healthy PD patients attending a university hospital dialysis centre for routine outpatient treatment, who had multi-frequency bioimpedance measurements of extracellular water to total body water (ECW/TBW. Results: The groups were well matched for age, sex, weight and ethnicity, PD patients had greater urine output [1,075 (485–1,613 vs. 42.5 (0–1,020 ml/day, p Conclusions: Overhydration is common in healthy stable PD outpatients, and ECW volumes in PD patients are not dissimilar to those of pre-dialysis HD patients. The role of chronic volume overload as a risk factor for cardiovascular disease needs further investigation.

  13. Guidance and Control Software Project Data - Volume 2: Development Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the development documents from the GCS project. Volume 2 contains three appendices: A. Guidance and Control Software Development Specification; B. Design Description for the Pluto Implementation of the Guidance and Control Software; and C. Source Code for the Pluto Implementation of the Guidance and Control Software

  14. European DataGrid project: status and plans

    International Nuclear Information System (INIS)

    Kunszt, P.

    2003-01-01

    The European DataGrid (EDG) project has reached, after 1.5 years, the middle of its lifetime. In this article we give an overview of the status, components, procedures and plans of the EDG project as of June 2002. The objective of the EDG project is to assist the next generation of scientific exploration, computation and analysis of large-scale data sets--from hundreds of terabytes to petabytes, across widely distributed scientific communities. The primary goal of the first phase of the EDG project was to assemble a distributed testbed to demonstrate that the EDG middleware components could be integrated into a production-quality computational Grid, as well as to gain experience with such a system. The very first version of the EDG testbed was deployed toward the end of 2001. At the first official European Union review of the project on March 1, 2002, it has been found that the project is on the right track to achieve its goals. Since then the EDG middleware, testbed components and procedures have been continuously refined according to the requirements of our user communities and our experience

  15. Status of the FRM-II project

    International Nuclear Information System (INIS)

    Boening, K.

    1994-01-01

    The new research reactor FRM-II at Garching near Munich is planned to become a high performance source of slow neutrons in Germany. Its design concept provides for a very compact reactor core cooled by light water and placed within a heavy water moderator tank, where a high thermal neutron flux will be obtained at only 20 MW power. - This paper begins with an overview over some of the essential design features and some more recent design modifications. It then reports on the status of the project, the most important event being a positive decision which the Bavarian State Government has made in January 1993 and which represented a green light for the project to enter the next project phase. Consequently, two official requests have been made by the Technical University of Munich, one for the nuclear licensing of the facility and the other for the so called 'Raumordnungsverfahren'. In this context the final version of the FRM-II safety report has been submitted to the nuclear licensing authority. (author)

  16. Current status of the IREN project

    International Nuclear Information System (INIS)

    Furman, W.I.

    1997-01-01

    A current status and a corrected time-schedule of the project of the new Intense Resonance Neutron pulsed source (IREN) realized in JINR (Dubna) for experiments dealing with fundamental and applied nuclear physics studies are discussed. This source is the upgraded variant of the existing IBR-30 pulsed booster. It consists of the 200 MeV electron linac and supplying by an electron beam the photo-neutron converter placed in the center of the very fast multiplying subcritical core. The existing buildings and beam infrastructure are planned to adopt for the new IREN source. The aim of the project is to improve essentially an energy resolution of the time-of-flight spectrometer and to increase twice (up to 10 15 n/sec) an integral neutron yield. An implementation of the IREN project has started in June 1994 with the planned end in December 1997. But due to mainly insufficient financing the approved time-schedule is shifted. Now most optimistic time of start-up of the neutron source is the end of 1999

  17. Ice volume distribution and implications on runoff projections in a glacierized catchment

    Directory of Open Access Journals (Sweden)

    J. Gabbi

    2012-12-01

    Full Text Available A dense network of helicopter-based ground-penetrating radar (GPR measurements was used to determine the ice-thickness distribution in the Mauvoisin region. The comprehensive set of ice-thickness measurements was combined with an ice-thickness estimation approach for an accurate determination of the bedrock. A total ice volume of 3.69 ± 0.31 km3 and a maximum ice thickness of 290 m were found. The ice-thickness values were then employed as input for a combined glacio-hydrological model forced by most recent regional climate scenarios. This model provided glacier evolution and runoff projections for the period 2010–2100. Runoff projections of the measured initial ice volume distribution show an increase in annual runoff of 4% in the next two decades, followed by a persistent runoff decrease until 2100. Finally, we checked the influence of the ice-thickness distribution on runoff projections. Our analyses revealed that reliable estimates of the ice volume are essential for modelling future glacier and runoff evolution. Wrong estimations of the total ice volume might even lead to deviations of the predicted general runoff trend.

  18. Status of the National Synchrotron Light Source project

    International Nuclear Information System (INIS)

    Heese, R.N.

    1981-01-01

    The National Synchrotron Light Source is in its final stages of construction, and as the turn-on time for the 700 MeV vuv storage ring draws near, an overview of the project is presented. Emphasis is placed on the linac and booster synchrotron performance and the status of major subsystems

  19. Yucca Mountain Project technical status report (TSR), October 1989--March 1990

    International Nuclear Information System (INIS)

    1990-01-01

    This Yucca Mountain Project Technical Status Report (TSR) on site characterization is the second in a series of reports that will be issued at approximately six-month intervals during site characterization. In addition, progress made toward the initiation and conduct of new site characterization activities is included. For this report, information on the technical progress made by Yucca Mountain Project participating organizations has been compiled covering the period from October 1989, through March 31, 1990. The status report consists of three sections: an introductory section; a section on the status of site characterization, which includes preparatory activities, sites programs, repository design, seals system design, waste package design, and performance assessment; and a reference section, which provides a complete listing of all published documents cited in the text. 59 refs

  20. WFIRST: Project Overview and Status

    Science.gov (United States)

    Kruk, Jeffrey; WFIRST Formulation Science Working Group, WFIRST Project Team

    2018-01-01

    The Wide-Field InfraRed Survey Telescope (WFIRST) will be the next Astrophysics flagship mission to follow JWST. The observatory payload consists of a Hubble-size telescope aperture with a wide-field NIR instrument and a coronagraph operating at visible wavelengths and employing state-of-the-art wavefront sensing and control. The Wide-field instrument is optimized for large area NIR imaging and spectroscopic surveys, with performance requirements driven by programs to study cosmology and exoplanet detection via gravitational microlensing. All data will be public immediately, and a substantial guest observer program will be supported.The WFIRST Project is presently in Phase A, with a transition to Phase B expected in early to mid 2018. Candidate observing programs are under detailed study in order to inform the mission design, but the actual science investigations will not be selected until much closer to launch. We will present an overview of the present mission design and expected performance, a summary of Project status, and plans for selecting the observing programs.

  1. Guidance and Control Software Project Data - Volume 3: Verification Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the verification documents from the GCS project. Volume 3 contains four appendices: A. Software Verification Cases and Procedures for the Guidance and Control Software Project; B. Software Verification Results for the Pluto Implementation of the Guidance and Control Software; C. Review Records for the Pluto Implementation of the Guidance and Control Software; and D. Test Results Logs for the Pluto Implementation of the Guidance and Control Software.

  2. Status report : Terra Nova project environmental assessment panel : recommendations

    International Nuclear Information System (INIS)

    2002-01-01

    An application to the Canada-Newfoundland Offshore Petroleum Board (CNOPB) was submitted by Petro-Canada on August 5, 1996, notifying of its intent to develop the petroleum resources located at the Terra Nova field. The provincial and federal governments jointly appointed the Terra Nova Project Environmental Panel, and the board of the CNOPB referred to it the application documents for review. The environmental effects, considerations of human safety incorporated into the design and operation of the Project, the general approach to the development and exploitation of the petroleum resources, and the employment and industrial benefits expected to be derived from the Project were the issues under review by the Panel. On April 22, 1997, public hearings into the review began, and the final report was submitted to governments and the Board in August 1997. The report included 75 recommendations. The Project was approved in Decision 97.02 in December 1997, and the Board dealt with each of the recommendations. The respective positions of the Governments of Canada and Newfoundland and Labrador with regard to the recommendations that fell outside the jurisdiction of the Board were made public. A status report on every one of the 75 recommendations is provided in the present report. The recommendation is repeated, the verbatim response taken from Decision 97.02 included, followed by the status of the response. The production operations phase of the Project accounts for approximately 65 per cent of the recommendations. January 20, 2002 was the date the Project was begun

  3. Comprehensive assessment of the status scientific and technical projects using Technology Project Readiness Level

    Directory of Open Access Journals (Sweden)

    A. N. Petrov

    2016-01-01

    Full Text Available The balanced methodology for assessing the Technology Project Readiness Level for commercialization (TPRL is proposed. TPRL allows to determine the dynamics and balance of development projects that use the standardized approaches used in assessing the readiness of the technology. Validation of the methodology undertaken for the projects of Federal target programs “Research and development on priority directions of development of scientific-technological complex of Russia for 2007–2013” and “Research and development on priority directions of development of scientific-technological complex of Russia for 2014–2020”. The obtained results showed the possibility of application of the methodology for the evaluation of projects, improving efficiency of expert activity in the evaluation of projects, monitoring the status of individual project and group of projects (portfolio. The application of the methodology allowed us to improve the management of individual project and portfolio of projects.Methodology TPRL will allow the implementers, industry partners, investors, and innovative industrial companies to improve the efficiency of its activities.

  4. Management control and status reports documentation standard and Data Item Descriptions (DID). Volume of the information system life-cycle and documentation standards, volume 5

    Science.gov (United States)

    Callender, E. David; Steinbacher, Jody

    1989-01-01

    This is the fifth of five volumes on Information System Life-Cycle and Documentation Standards. This volume provides a well organized, easily used standard for management control and status reports used in monitoring and controlling the management, development, and assurance of informations systems and software, hardware, and operational procedures components, and related processes.

  5. The Super-B project accelerator status

    CERN Document Server

    Biagini, M.E.; Boni, R; Boscolo, M; Demma, T; Drago, A; Esposito, M; Guiducci, S; Marcellini, F; Mazzitelli, G; Preger, M; Raimondi, P; Sanelli, C; Serio, M; Stecchi, A; Stella, A; Tomassini, S; Zobov, M; Bertsche, K; Brachmann, A; Cai, Y; Chao, A; DeLira, A; Donald, M; Fisher, A; Kharakh, D; Krasnykh, A; Li, N; MacFarlane, D; Nosochkov, Y; Novokhatski, A; Pivi, M.; Seeman, J; Sullivan, M; Wienands, U; Weisend, J; Wittmer, W; Koop, I; Levichev, E; Nikitin, S; Piminov, P; Sinyatkin, S; Shatilov, D; Bolzon, B; Brunetti, L; Jeremie, A; Baylac, M; DeConto, J M; Gomez, Y; Meot, F; Monseu, N; Tourres, D; Bonis, J.; Chehab, R; Le Meur, G; Mercier, B; Poirier, F; Prevost, C; Rimbault, C; Touze, F; Variola, A; Chance, A; Napoly, O; Bosi, F; Liuzzo, S; Paoloni, E; Bettoni, S

    2010-01-01

    The SuperB project is an international effort aiming at building in Italy a very high luminosity e+e- (1036 cm-2 sec-1) asymmetric collider at the Y(4S) energy in the cm. The accelerator design has been extensively studied and changed during the past year. The present design, based on the new collision scheme, with large Piwinski angle and the use of “crab waist” sextupoles already successfully tested at the DANE -Factory at LNF Frascati, provides larger flexibility, better dynamic aperture and spin manipulation sections in the Low Energy Ring (LER) for longitudinal polarization of the electron beam at the Interaction Point (IP). The Interaction Region (IR) has been further optimized in terms of apertures and reduced backgrounds in the detector. The injector complex design has been also updated. A summary of the project status will be presented in this paper

  6. User's operating procedures. Volume 2: Scout project financial analysis program

    Science.gov (United States)

    Harris, C. G.; Haris, D. K.

    1985-01-01

    A review is presented of the user's operating procedures for the Scout Project Automatic Data system, called SPADS. SPADS is the result of the past seven years of software development on a Prime mini-computer located at the Scout Project Office, NASA Langley Research Center, Hampton, Virginia. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, two (2) of three (3), provides the instructions to operate the Scout Project Financial Analysis program in data retrieval and file maintenance via the user friendly menu drivers.

  7. Status of ITER Cryodistribution and Cryoline project

    Science.gov (United States)

    Sarkar, B.; Vaghela, H.; Shah, N.; Bhattacharya, R.; Choukekar, K.; Patel, P.; Kapoor, H.; Srinivasa, M.; Chang, H. S.; Badgujar, S.; Monneret, E.

    2017-02-01

    The system of ITER Cryodistribution (CD) and Cryolines (CLs) is an integral interface between the Cryoplant systems and the superconducting (SC) magnets as well as Cryopumps (CPs). The project has progressed from the conceptual stage to the industrial stage. The subsystems are at various stages of design as defined by the project, namely, preliminary design, final design and formal reviews. Significant progresses have been made in the prototypes studies and design validations, such as the CL and cold circulators. While one of the prototype CL is already tested, the other one is in manufacturing phase. Performance test of two cold circulators have been completed. Design requirements are unique due the complexity arising from load specifications, layout constraints, regulatory compliance, operating conditions as well as several hundred interfaces. The present status of the project in terms of technical achievements, implications of the changes and the technical management as well as the risk assessment and its mitigation including path forward towards realization is described.

  8. Next Generation Life Support Project Status

    Science.gov (United States)

    Barta, Daniel J.; Chullen, Cinda; Pickering, Karen D.; Cox, Marlon; Towsend, Neil; Campbell, Colin; Flynn, Michael; Wheeler, Raymond

    2012-01-01

    Next Generation Life Support (NGLS) is one of several technology development projects sponsored by NASA s Game Changing Development Program. The NGLS Project is developing life support technologies (including water recovery and space suit life support technologies) needed for humans to live and work productively in space. NGLS has three project tasks: Variable Oxygen Regulator (VOR), Rapid Cycle Amine (RCA) swing bed, and Alternative Water Processor (AWP). The RCA swing bed and VOR tasks are directed at key technology needs for the Portable Life Support System (PLSS) for an Advanced Extravehicular Mobility Unit, with focus on test article development and integrated testing in an Advanced PLSS in cooperation with the Advanced Extra Vehicular Activity (EVA) Project. An RCA swing-bed provides integrated carbon dioxide removal and humidity control that can be regenerated in real time during an EVA. The VOR technology will significantly increase the number of pressure settings available to the space suit. Current space suit pressure regulators are limited to only two settings whereas the adjustability of the advanced regulator will be nearly continuous. The AWP effort, based on natural biological processes and membrane-based secondary treatment, will result in the development of a system capable of recycling wastewater from sources expected in future exploration missions, including hygiene and laundry water. This paper will provide a status of technology development activities and future plans.

  9. Volume dependence of light hadron masses in full lattice QCD

    Energy Technology Data Exchange (ETDEWEB)

    Orth, B.; Lippert, T.; Schilling, K

    2004-03-01

    The aim of the GRAL project is to simulate full QCD with standard Wilson fermions at light quark masses on small to medium-sized lattices and to obtain infinite-volume results by extrapolation. In order to establish the functional form of the volume dependence we study systematically the finite-size effects in the light hadron spectrum. We give an update on the status of the GRAL project and show that our simulation data for the light hadron masses depend exponentially on the lattice size.

  10. Volume dependence of light hadron masses in full lattice QCD

    International Nuclear Information System (INIS)

    Orth, B.; Lippert, T.; Schilling, K.

    2004-01-01

    The aim of the GRAL project is to simulate full QCD with standard Wilson fermions at light quark masses on small to medium-sized lattices and to obtain infinite-volume results by extrapolation. In order to establish the functional form of the volume dependence we study systematically the finite-size effects in the light hadron spectrum. We give an update on the status of the GRAL project and show that our simulation data for the light hadron masses depend exponentially on the lattice size

  11. Status of safety issues at licensed power plants

    International Nuclear Information System (INIS)

    1991-06-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, a program has been established whereby an annual NUREG report will be published on the status of licensee implementation and NRC verification of safety issues in major NRC requirement areas. This report, the third volume of a three-volume series, addresses the status of generic safety issues (GSIs) at licensed plants. Volume 1 addressed the status of Three Mile Island Action Plan requirements and was published in March 1991. Volume 2 addressed the status of implementation and verification of unresolved safety issues and was published in May 1991. The annual NUREG report will combine these three areas in a single volume to be published in late 1991. The data contained in these NUREG reports are a product of the NRC's Safety Issues Management System (SIMS) database, which is maintained by the Project Management Staff in the Office of Nuclear Reactor Regulation and by NRC regional personnel. The purpose of this report is to provide a comprehensive description of the status of implementation and verification of the 34 GSIs and sub-issues that have been resolved by the NRC and involve implementation of an action or actions by licensees. This NUREG report also serves as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues up until a request for action by licensees is issued by NRC. 3 figs., 6 tabs

  12. Hanford spent nuclear fuel project recommended path forward, volume III: Alternatives and path forward evaluation supporting documentation

    International Nuclear Information System (INIS)

    Fulton, J.C.

    1994-10-01

    Volume I of the Hanford Spent Nuclear Fuel Project - Recommended Path Forward constitutes an aggressive series of projects to construct and operate systems and facilities to safely retrieve, package, transport, process, and store K Basins fuel and sludge. Volume II provided a comparative evaluation of four Alternatives for the Path Forward and an evaluation for the Recommended Path Forward. Although Volume II contained extensive appendices, six supporting documents have been compiled in Volume III to provide additional background for Volume II

  13. Status of the RA research reactor decommissioning project

    International Nuclear Information System (INIS)

    Ljubenov, V.; Nikolic, D.; Pesic, M.; Milosevic, M.; Kostic, Lj.; Steljic, M.; Sotic, O.; Antic, D. . E-mail address of corresponding author: vladan@vin.bg.ac.yu; Ljubenov, V.)

    2005-01-01

    The 6.5 MW heavy water RA research reactor at the VINCA Institute of Nuclear Sciences operated from 1959 to 1984. After 18 years of extended shutdown in 2002 it was decided that the reactor shutdown should be final. Preliminary decommissioning activities have been initiated by the end of 2002 under the Technical Co-operation Programme of the International Atomic Energy Agency. The objective of the project is to implement safe, timely and cost-effective decommissioning of the RA reactor up to unrestricted use of the site. Decommissioning project is closely related to two other projects: Safe Removal of the RA Reactor Spent Nuclear Fuel and Radioactive Waste Management in VINCA Institute. The main phases of the project include preparation of the detailed decommissioning plan, radiological characterization of the reactor site, dismantling and removal of the reactor components and structures, decontamination, final radiological site survey and the documentation of all the activities in order to obtain the approval for unrestricted use of the facility site. In this paper a review of the activities related to the preparation and realization of the RA reactor decommissioning project is given. Status of the project's organizational and technical aspects as for July 2004 are presented and plans for the forthcoming phases of the project realization are outlined. (author)

  14. Selected topics in particle accelerators: Proceedings of the CAP meetings. Volume 3

    International Nuclear Information System (INIS)

    Parsa, Z.

    1995-01-01

    This Report includes copies of transparencies and notes from the presentations made at the Center for Accelerator Physics at Brookhaven National Laboratory. Editing and changes to authors' contributions in this Report were made only to fulfill the publication requirements. This volume includes notes and transparencies on eight presentations: ''Inverse Cherenkov Laser Acceleration of Electron Beams'', ''High Brightness Field Emission Cathodes'', ''QCD/Teraflop Collaboration: The Future of Supercomputing'', ''Report on Dipole R ampersand D'', ''Reaching Maximum Luminosity in Hadron Colliders at 10-100 TeV'', ''STAR Collaboration Project Status Report: Quarks and Gluons'', ''PHENIX Collaboration Project Status Report'', and ''Update on Status of BNL Relativistic Heavy Ion Collider (RHIC) Project: RHIC Design Issues.''

  15. Current status of RCA projects and strategies for future implementation

    International Nuclear Information System (INIS)

    Kim, Kyoung Pyo; Lee, Jeong Kong

    1998-12-01

    This report is intended to provide basic overall information about ways to promote technical cooperation within the framework of RCA to accelerate and coordinate cooperative activities in nuclear science and technology in Asia and the Pacific region through a thorough review on the current status and through suggesting future implementation strategies. The contents of this report include an overall introduction of RCA, guidelines and operating rules for RCA programmes, current status and future plans for RCA projects as well as the RCA vision for the next 25 years. By reviewing the current status and future implementation strategies for RCA projects, it will help to set up a national nuclear policy aimed at seeking maximum benefits from participation in RCA projects and to implement programmes for nuclear cooperation with Asian-Pacific countries. It is expected that as a lead country for the energy sector, which is one of five thematic areas for the year 1999 - 2000 cycle programmes, Korea will continue to make significant contributions towards the implementation of RCA programmes in the future. With this report, we plan to keep up with future developments as well as implement an effective cooperation with the countries in the region so that the opinion of Korea, one of the nuclear advanced countries in the region, can be fully reflected in the establishment of future plans for RCA programmes. (author). 3 refs., 5 tabs., 1 fig

  16. Status of the KM3NeT project

    International Nuclear Information System (INIS)

    Katz, U.F.

    2009-01-01

    KM3NeT is a future research infrastructure in the Mediterranean Sea, hosting a cubic-kilometre scale neutrino telescope and nodes for associated sciences such as marine biology, oceanology and geophysics. The status of the KM3NeT project and the progress made in the EU-funded Design Study is reviewed. Some physics studies indicating the sensitivity of the KM3NeT neutrino telescope are highlighted and selected major technical design options to be further pursued are described. Finally, the remaining steps towards construction of KM3NeT will be discussed. This document reflects the status of the KM3NeT Conceptual Design Report (CDR), which has been presented to the public for the first time at the VLVnT08 Workshop.

  17. Status of the JET project and its supporting technological programme

    International Nuclear Information System (INIS)

    Bertolini, E.

    1976-01-01

    A brief review of the overall design of the JET facility is given. Particular JET components described include the vacuum system, toroidal field coils, poloidal system, power supplies, control and data acquisition, and status of the project towards the construction phase

  18. 1980 survey and evaluation of utility conservation, load management, and solar end-use projects. Volume 3: utility load management projects. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    The results of the 1980 survey of electric utility-sponsored energy conservation, load management, and end-use solar energy conversion projects are described. The work is an expansion of a previous survey and evaluation and has been jointly sponsored by EPRI and DOE through the Oak Ridge National Laboratory. There are three volumes and a summary document. Each volume presents the results of an extensive survey to determine electric utility involvement in customer-side projects related to the particular technology (i.e., conservation, solar, or load management), selected descriptions of utility projects and results, and first-level technical and economic evaluations.

  19. National synchrotron light source basic design and project status

    International Nuclear Information System (INIS)

    van Steenbergen, A.

    1981-01-01

    A summary description and the basic design parameters of the National Synchrotron Light Source, a facility for the generation of intense synchrotron radiation in the vuv and x-ray range is presented, the parameters of the sources are given, the presently planned facility beam lines are tabulated and the status of the project is indicated

  20. Assessment of the Status of African-Americans. Volume III: The Education of African-Americans.

    Science.gov (United States)

    Willie, Charles V., Ed.; Garibaldi, Antoine M., Ed.; Reed, Wornie L., Ed.

    In 1987 a project was undertaken to assess the status of African Americans in the United States in the topical areas to be addressed by the National Research Council's Study Committee on the Status of Black Americans: education, employment, income and occupations, political participation and the administration of justice, social and cultural…

  1. Next Generation Life Support Project Status

    Science.gov (United States)

    Barta, Daniel J.; Chullen, Cinda; Vega, Leticia; Cox, Marlon R.; Aitchison, Lindsay T.; Lange, Kevin E.; Pensinger, Stuart J.; Meyer, Caitlin E.; Flynn, Michael; Jackson, W. Andrew; hide

    2014-01-01

    Next Generation Life Support (NGLS) is one of over twenty technology development projects sponsored by NASA's Game Changing Development Program. The NGLS Project develops selected life support technologies needed for humans to live and work productively in space, with focus on technologies for future use in spacecraft cabin and space suit applications. Over the last three years, NGLS had five main project elements: Variable Oxygen Regulator (VOR), Rapid Cycle Amine (RCA) swing bed, High Performance (HP) Extravehicular Activity (EVA) Glove, Alternative Water Processor (AWP) and Series-Bosch Carbon Dioxide Reduction. The RCA swing bed, VOR and HP EVA Glove tasks are directed at key technology needs for the Portable Life Support System (PLSS) and pressure garment for an Advanced Extravehicular Mobility Unit (EMU). Focus is on prototyping and integrated testing in cooperation with the Advanced Exploration Systems (AES) Advanced EVA Project. The HP EVA Glove Element, new this fiscal year, includes the generation of requirements and standards to guide development and evaluation of new glove designs. The AWP and Bosch efforts focus on regenerative technologies to further close spacecraft cabin atmosphere revitalization and water recovery loops and to meet technology maturation milestones defined in NASA's Space Technology Roadmaps. These activities are aimed at increasing affordability, reliability, and vehicle self-sufficiency while decreasing mass and mission cost, supporting a capability-driven architecture for extending human presence beyond low-Earth orbit, along a human path toward Mars. This paper provides a status of current technology development activities with a brief overview of future plans.

  2. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1994 quality program status report

    International Nuclear Information System (INIS)

    Bolivar, S.L.

    1996-03-01

    This status report is for calendar year 1994. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, a baseline is established that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify adverse trends and to evaluate improvements. This is the fourth annual status report

  3. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1994 quality program status report

    Energy Technology Data Exchange (ETDEWEB)

    Bolivar, S.L.

    1996-03-01

    This status report is for calendar year 1994. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, a baseline is established that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify adverse trends and to evaluate improvements. This is the fourth annual status report.

  4. Topical report review status. Volume 7, No. 2

    International Nuclear Information System (INIS)

    1984-11-01

    Purpose of this document is to provide periodic progress reports of on-going topical report reviews, to identify those topical reports for which the NRC staff review has been completed and those which are under review and to provide NRC management with sufficient information regarding the conduct of the topical report program to permit taking whatever actions are deemed necessary or appropriate. This document is also intended to be a source of information to NRC Licensing Project Managers and other NRC personnel regarding the status of topical reports which may be referenced in applications for which they have responsibility

  5. Weight Care Project: Health professionals' attitudes and ability to assess body weight status - Study protocol

    LENUS (Irish Health Repository)

    Moorhead, Anne

    2011-03-31

    Abstract Background Health professionals working in primary care and public health have opportunities to address body weight status issues with their patients through face-to-face contact. The objectives of this all-Ireland project are: 1. to assess the attitudes, current practices\\/behaviours and knowledge of key health professional groups on body weight status; 2. to assess the health professional groups\\' ability to identify body weight status in both adults and children. The health professional groups are: (a) community related public health nurses; (b) school public health nurses; (c) GPs and practice nurses (primary care); and (d) occupational health nurses (workplace) from both Northern Ireland and the Republic of Ireland. Methods\\/Design This all-Ireland multi-disciplinary project follows a mixed methods approach using both quantitative and qualitative methodologies, and consists of four components: 1. Literature review - to explore the role of health professionals in managing obesity through spontaneous intervention in a variety of health promotion settings. 2. Telephone interviews and focus groups - to gain an in-depth insight into the views of health professionals in assessing body weight status. 3. Survey (primarily online but also paper-based) - to determine the attitudes, current practices\\/behaviours and knowledge of health professionals in assessing body weight status. 4. Online evaluation study - an online interactive programme will be developed to assess health professionals\\' ability to identify the body weight status of adults and children. Discussion This project will assess and report the attitudes, current practices\\/behaviours and knowledge of key health professional groups within Northern Ireland and the Republic of Ireland on body weight status, and their ability to identify body weight status in both adults and children. The results of this project will generate recommendations for clinical practice in managing obesity, which may

  6. Weight Care Project: Health professionals' attitudes and ability to assess body weight status - Study protocol

    Directory of Open Access Journals (Sweden)

    Murphy Kathy

    2011-03-01

    Full Text Available Abstract Background Health professionals working in primary care and public health have opportunities to address body weight status issues with their patients through face-to-face contact. The objectives of this all-Ireland project are: 1. to assess the attitudes, current practices/behaviours and knowledge of key health professional groups on body weight status; 2. to assess the health professional groups' ability to identify body weight status in both adults and children. The health professional groups are: (a community related public health nurses; (b school public health nurses; (c GPs and practice nurses (primary care; and (d occupational health nurses (workplace from both Northern Ireland and the Republic of Ireland. Methods/Design This all-Ireland multi-disciplinary project follows a mixed methods approach using both quantitative and qualitative methodologies, and consists of four components: 1. Literature review - to explore the role of health professionals in managing obesity through spontaneous intervention in a variety of health promotion settings. 2. Telephone interviews and focus groups - to gain an in-depth insight into the views of health professionals in assessing body weight status. 3. Survey (primarily online but also paper-based - to determine the attitudes, current practices/behaviours and knowledge of health professionals in assessing body weight status. 4. Online evaluation study - an online interactive programme will be developed to assess health professionals' ability to identify the body weight status of adults and children. Discussion This project will assess and report the attitudes, current practices/behaviours and knowledge of key health professional groups within Northern Ireland and the Republic of Ireland on body weight status, and their ability to identify body weight status in both adults and children. The results of this project will generate recommendations for clinical practice in managing obesity, which may

  7. User's guide for PRISM (Plant Risk Status Information Management System) Arkansas Nuclear One-Unit 1: Volume 1, Program for inspectors

    International Nuclear Information System (INIS)

    Campbell, D.J.; Guthrie, V.H.; Kirchner, J.R.; Kirkman, J.Q.; Paula, H.M.; Ellison, B.C.; Dycus, F.M.; Farquharson, J.A.; Flanagan, G.F.

    1988-03-01

    This user's guide is a two-volume document designed to teach NRC inspectors and NRC regulators how to access probabilistic risk assessment information from the two Plant Risk Status Information Management System (PRISIM) programs developed for Arkansas Nuclear One -- Unit One (ANO-1). This document, Volume 1, describes how the PRA information available in Version 1.0 of PRISIM is useful for planning inspections. Using PRISIM, inspectors can quickly access PRA information and use that information to update risk analysis results, reflecting a plant's status at any particular time. Both volumes are stand-alone documents, and each volume presents several sample computer sessions designed to lead the user through a variety of PRISIM applications used to obtain PRA-related information for monitoring and controlling plant risk

  8. 94-1 Research and development project lead laboratory support. Status report, January 1--March 31, 1997

    Energy Technology Data Exchange (ETDEWEB)

    Rink, N.A. [comp.

    1997-08-01

    This status report is published for Los Alamos National Laboratory 94-1 Research and Development Project Support. The Department of Energy Office of Environmental Management funds these projects in order to support the storage or disposal of legacy plutonium and plutonium-bearing materials that resulted from weapons production throughout the DOE complex. This report summarizes status and technical progress for Los Alamos 94-1 projects during the second quarter of fiscal year 1997.

  9. 94-1 Research and development project lead laboratory support. Status report, January 1--March 31, 1997

    International Nuclear Information System (INIS)

    Rink, N.A.

    1997-08-01

    This status report is published for Los Alamos National Laboratory 94-1 Research and Development Project Support. The Department of Energy Office of Environmental Management funds these projects in order to support the storage or disposal of legacy plutonium and plutonium-bearing materials that resulted from weapons production throughout the DOE complex. This report summarizes status and technical progress for Los Alamos 94-1 projects during the second quarter of fiscal year 1997

  10. The CAREM project: Present status and development activities

    International Nuclear Information System (INIS)

    Boado Magan, H.J.; Ordonez, J.P.; Hey, A.

    1997-01-01

    The CAREM Project is a low power NPP of 25 Mwe, with an integrated self pressurized primary system. The cooling of the primary system is of the natural circulation type and several passive safety systems are included. The owner of the Project is Argentina's CNEA (Comision Nacional de Energia Atomica) and its associated company, INVAP, is the main contractor. The present status of the CAREM Project is presented. The possible evolution of the CAREM project is mentioned in relation with a new containment design. A short description of the Experimental Facilities, listed below, already in operation and under construction are also included: CAPCN High Pressure Loop. Natural convection loop to verify dynamic response and critical heat flux; RA-8. Critical Facility, designed and constructed for the CAREM Project (that may be used as a general uses facility); RPV lnternals. The whole assembly of absorbent rods, connecting rods and the rode guides are being constructed in a 1:1 scale. The aims of this experimental facility are vibration analysis and manufacturing parameters definitions. Control Drive Mechanisms. A series of verification and tests are being carried out on these within RPV Hydraulically driven mechanisms. Other development activities are mentioned in relation with the thermalhydraulics, Steam Generators and Control. (author)

  11. Status of high temperature superconductor cable and fault current limiter projects at American Superconductor

    International Nuclear Information System (INIS)

    Maguire, J.F.; Yuan, J.

    2009-01-01

    This paper will describe the status of three key programs currently underway at American Superconductor Corp. The first program is the LIPA project which is a transmission voltage high temperature superconducting cable program, with funding support from the US Department of Energy. The 600 m cable, capable of carrying 574 MVA, was successfully installed and commissioned in LIPA grid on April 22, 2008. An overview of the project, system level design details and operational data will be provided. In addition, the status of the newly awarded LIPA II project will be described. The second program is Project Hydra, with funding support from the US Department of Homeland Security, to design, develop and demonstrate an HTS cable with fault current limiting functionality. The cable is 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The cable will be permanently installed and energized in Manhattan, New York in 2010. The initial status of Project Hydra will be presented. The final program to be discussed is a transmission voltage, high temperature superconducting fault current limiter funded by the US DOE. The project encompasses the design, construction and test of a 115 kV FCL for power transmission within a time frame of 4-5 years. Installation and testing are planned for a Southern California Edison substation. A project overview and progress under the first phase will be reported.

  12. Status of high temperature superconductor cable and fault current limiter projects at American Superconductor

    Energy Technology Data Exchange (ETDEWEB)

    Maguire, J.F., E-mail: jmaguire@amsc.co [American Superconductor Co., 64 Jackson Road, Devens, MA 01434 (United States); Yuan, J. [American Superconductor Co., 64 Jackson Road, Devens, MA 01434 (United States)

    2009-10-15

    This paper will describe the status of three key programs currently underway at American Superconductor Corp. The first program is the LIPA project which is a transmission voltage high temperature superconducting cable program, with funding support from the US Department of Energy. The 600 m cable, capable of carrying 574 MVA, was successfully installed and commissioned in LIPA grid on April 22, 2008. An overview of the project, system level design details and operational data will be provided. In addition, the status of the newly awarded LIPA II project will be described. The second program is Project Hydra, with funding support from the US Department of Homeland Security, to design, develop and demonstrate an HTS cable with fault current limiting functionality. The cable is 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The cable will be permanently installed and energized in Manhattan, New York in 2010. The initial status of Project Hydra will be presented. The final program to be discussed is a transmission voltage, high temperature superconducting fault current limiter funded by the US DOE. The project encompasses the design, construction and test of a 115 kV FCL for power transmission within a time frame of 4-5 years. Installation and testing are planned for a Southern California Edison substation. A project overview and progress under the first phase will be reported.

  13. Status of high temperature superconductor cable and fault current limiter projects at American Superconductor

    Science.gov (United States)

    Maguire, J. F.; Yuan, J.

    2009-10-01

    This paper will describe the status of three key programs currently underway at American Superconductor Corp. The first program is the LIPA project which is a transmission voltage high temperature superconducting cable program, with funding support from the US Department of Energy. The 600 m cable, capable of carrying 574 MVA, was successfully installed and commissioned in LIPA grid on April 22, 2008. An overview of the project, system level design details and operational data will be provided. In addition, the status of the newly awarded LIPA II project will be described. The second program is Project Hydra, with funding support from the US Department of Homeland Security, to design, develop and demonstrate an HTS cable with fault current limiting functionality. The cable is 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The cable will be permanently installed and energized in Manhattan, New York in 2010. The initial status of Project Hydra will be presented. The final program to be discussed is a transmission voltage, high temperature superconducting fault current limiter funded by the US DOE. The project encompasses the design, construction and test of a 115 kV FCL for power transmission within a time frame of 4-5 years. Installation and testing are planned for a Southern California Edison substation. A project overview and progress under the first phase will be reported.

  14. Yucca Mountain Project Site Atlas: Volume 1: Draft

    International Nuclear Information System (INIS)

    1988-10-01

    The Nevada Nuclear Waste Storage Investigations (NNWSI) Project Site Atlas is a reference document of field activities which have been, or are being, conducted by the US Department of Energy (DOE) to support investigations of Yucca Mountain as a potential site for an underground repository for high-level radioactive waste. These investigations, as well as future investigations, will yield geologic, geophysical, geochemical, geomechanical, hydrologic, volcanic, seismic, and environmental data necessary to characterize Yucca Mountain and its regional setting. This chapter summarizes the background of the NNWSI Project and the objective, scope, structure, and preparation of the Site Atlas. Chapter 2 describes in more detail the bibliography and map portfolio portions of the Atlas, which are presented in Chapter 4 and Volume 2, respectively. Chapter 3 describes how to use the Atlas. The objective of the Site Atlas is to create a management tool for the DOE Waste Management Project Office (WMPO) that will allow the WMPO to compile and disseminate information regarding the location of NNWSI Project field investigations, and document the permits acquired and the environmental, archaeological, and socioeconomic surveys conducted to support those investigations. The information contained in the Atlas will serve as a historical reference of site investigation field activities. A companion document to the Atlas is the NNWSI Project Surface Based Investigations Plan (SBIP)

  15. Solid Waste Operations Complex W-113: Project cost estimate. Preliminary design report. Volume IV

    International Nuclear Information System (INIS)

    1995-01-01

    This document contains Volume IV of the Preliminary Design Report for the Solid Waste Operations Complex W-113 which is the Project Cost Estimate and construction schedule. The estimate was developed based upon Title 1 material take-offs, budgetary equipment quotes and Raytheon historical in-house data. The W-113 project cost estimate and project construction schedule were integrated together to provide a resource loaded project network

  16. Status of the McClean project, Saskatchewan, Canada

    International Nuclear Information System (INIS)

    Giroux, M.

    1997-01-01

    The paper describes the status of development of the McClean Lake uranium production project. The project includes development of a new mine/mill complex located 10 kilometres west of the Rabbit Lake mine site, in the Athabaska region of northern Saskatchewan, Canada. This first Canadian uranium project since Key Lake was developed in the late 1970s, is planned to help provide the increasing need for uranium production during the rest of the 1990s and beyond. The report describes the geological model for the 6 unconformity-type uranium orebodies named: JEB; Sue A, B and C; and McClean Lake A and B. These deposits will be extracted using both open pit and underground mines. The report describes the history of exploration and development, as well as the progression of the environmental clearance process under the joint review panel of the Canadian and Saskatchewan governments. The Canadian $250 million project, operated by Cogema Resources, is jointly owned by Denison Mines Limited, Minatco Limited and OURD (Canada) Company Limited. It is scheduled to start producing uranium concentrate in 1997. (author). 1 ref., 10 figs

  17. Selenium status, thyroid volume, and multiple nodule formation in an area with mild iodine deficiency

    DEFF Research Database (Denmark)

    Rasmussen, Lone Banke; Schomburg, Lutz; Kohrle, Josef

    2011-01-01

    ) introduction of iodine fortification. Serum selenium concentration and urinary iodine were measured, and the thyroid gland was examined by ultrasonography in the same subjects. Associations between serum selenium concentration and thyroid parameters were examined in multiple linear regression models...... or logistic regression models.Results: Serum selenium concentration was found to be significantly, negatively associated with thyroid volume (P=0.006), and a low selenium status significantly increased the risk for thyroid enlargement (P=0.007). Furthermore, low serum selenium status had a tendency...

  18. The INCA project: present status and outlook

    International Nuclear Information System (INIS)

    Aleksandrov, K.V.; Ammosov, V.V.; Chechin, V.A.; Chubenko, A.P.; Erlykin, A.D.; Ladygin, E.A.; Merzon, G.I.; Mukhamedshin, R.A.; Murashov, V.N.; Pavlyuchenko, V.P.; Ryabov, V.A.; Ryazhskaya, O.G.; Saito, T.; Sobolevskii, N.M.; Shchepetov, A.L.; Starkov, N.I.; Trostin, I.S.; Tsarev, V.A.; Wolfendale, A.; Zatsepin, G.T.; Zhdanov, G.B.; Zhukov, A.P.

    2002-01-01

    Scientific objectives, foundations, status, and outlook of the INCA Project are presented. Fundamentally new technique based on the ionization-neutron calorimeter (INCA) and designed to study local nearby sources of high-energy cosmic rays by direct measuring the spectrum and composition of the nuclear component in the 'knee' region and the spectrum of primary electrons in the energy range 0.1-10 TeV with the proton-background suppression factor up to 10 7 is discussed. Experimental data on exposition of the INCA prototypes to electron, pion, and proton beams at various energies and corresponding simulation results are presented. Prospects are considered

  19. Data base on dose reduction research projects for nuclear power plants. Volume 4

    Energy Technology Data Exchange (ETDEWEB)

    Khan, T.A.; Vulin, D.S.; Liang, H.; Baum, J.W. [Brookhaven National Lab., Upton, NY (United States)

    1992-08-01

    This is the fourth volume in a series of reports that provide information on dose reduction research and health physics technology for nuclear power plants. The information is taken from a data base maintained by Brookhaven National Laboratory`s ALARA Center for the Nuclear Regulatory Commission. This report presents information on 118 new or updated projects, covering a wide range of activities. Projects including steam generator degradation, decontamination, robotics, improvement in reactor materials, and inspection techniques, among others, are described in the research section of the report. The section on health physics technology includes some simple and very cost-effective projects to reduce radiation exposures. Included in this volume is a detailed description of how to access the BNL data bases which store this information. All project abstracts from this report, as well as many other useful documents, can be accessed, with permission, through our on-line system, ACE. A computer equipped with a modem, or a fax machine is all that is required to connect to ACE. Many features of ACE, including software, hardware, and communications specifics, are explained in this report.

  20. Status of the HIE-ISOLDE Project at CERN

    CERN Document Server

    Kadi, Y; Blumenfeld, Y; Bravin, E; Calatroni, S; Catherall, R; Fraser, M A; Goddard, B; Parchet, D; Siesling, E; Vandoni, G; Venturini Delsolaro, W; Voulot, D; Williams, L R

    2012-01-01

    The HIE-ISOLDE project represents a major upgrade of the ISOLDE facility with a mandate to significantly improve the quality and increase the intensity and energy of radioactive nuclear beams produced at CERN. The project will expand the experimental nuclear physics programme at ISOLDE by focusing on an upgrade of the existing REX linac with a 40 MV superconducting linac comprising thirty-two niobium-on-copper sputter-coated quarter-wave resonators housed in six cryomodules. The new linac will raise the energy of post-accelerated beams from 3 MeV/u to over 10 MeV/u. The upgrade will be staged to first deliver beam energies of 5.5 MeV/u using two high-β cryomodules placed downstream of REX, before the energy variable section of the existing linac is replaced with two low-β cryomodules and two additional high-β cryomodules are installed to attain over 10 MeV/u with full energy variability from as low as 0.45 MeV/u. An overview of the project including a status summary of the different R&D activities and ...

  1. Demons Registration of CT Volume and CBCT Projections for Adaptive Radiotherapy: Avoiding CBCT Reconstruction

    DEFF Research Database (Denmark)

    Bjerre, Troels; Aznar, M.; Munck af Rosenschöld, P.

    2012-01-01

    with adaptive fluidity (smoothing kernel width). For forward/back-projection, the separable footprints algorithm with trapezoid functions was applied. The similarity between the simulated and measured projections was measured as the SSD. Results: The figure shows a slice of; the CT volume (reference), the CT...

  2. Renewable Resources: a national catalog of model projects. Volume 3. Southern Solar Energy Center Region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-07-01

    This compilation of diverse conservation and renewable energy projects across the United States was prepared through the enthusiastic participation of solar and alternate energy groups from every state and region. Compiled and edited by the Center for Renewable Resources, these projects reflect many levels of innovation and technical expertise. In many cases, a critique analysis is presented of how projects performed and of the institutional conditions associated with their success or failure. Some 2000 projects are included in this compilation; most have worked, some have not. Information about all is presented to aid learning from these experiences. The four volumes in this set are arranged in state sections by geographic region, coinciding with the four Regional Solar Energy Centers. The table of contents is organized by project category so that maximum cross-referencing may be obtained. This volume includes information on the Southern Solar Energy Center Region. (WHK)

  3. Renewable Resources: a national catalog of model projects. Volume 1. Northeast Solar Energy Center Region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-07-01

    This compilation of diverse conservation and renewable energy projects across the United States was prepared through the enthusiastic participation of solar and alternate energy groups from every state and region. Compiled and edited by the Center for Renewable Resources, these projects reflect many levels of innovation and technical expertise. In many cases, a critique analysis is presented of how projects performed and of the institutional conditions associated with their success or failure. Some 2000 projects are included in this compilation; most have worked, some have not. Information about all is presented to aid learning from these experiences. The four volumes in this set are arranged in state sections by geographic region, coinciding with the four Regional Solar Energy Centers. The table of contents is organized by project category so that maximum cross-referencing may be obtained. This volume includes information on the Northeast Solar Energy Center Region. (WHK).

  4. Renewable Resources: a national catalog of model projects. Volume 4. Western Solar Utilization Network Region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-07-01

    This compilation of diverse conservation and renewable energy projects across the United States was prepared through the enthusiastic participation of solar and alternate energy groups from every state and region. Compiled and edited by the Center for Renewable Resources, these projects reflect many levels of innovation and technical expertise. In many cases, a critique analysis is presented of how projects performed and of the institutional conditions associated with their success or failure. Some 2000 projects are included in this compilation; most have worked, some have not. Information about all is presented to aid learning from these experiences. The four volumes in this set are arranged in state sections by geographic region, coinciding with the four Regional Solar Energy Centers. The table of contents is organized by project category so that maximum cross-referencing may be obtained. This volume includes information on the Western Solar Utilization Network Region. (WHK)

  5. Hanford tank waste operation simulator operational waste volume projection verification and validation procedure

    International Nuclear Information System (INIS)

    HARMSEN, R.W.

    1999-01-01

    The Hanford Tank Waste Operation Simulator is tested to determine if it can replace the FORTRAN-based Operational Waste Volume Projection computer simulation that has traditionally served to project double-shell tank utilization. Three Test Cases are used to compare the results of the two simulators; one incorporates the cleanup schedule of the Tri Party Agreement

  6. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack

    1984-11-01

    This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

  7. Inventory of Federal energy-related environment and safety research for FY 1977. Volume II. Project listings

    Energy Technology Data Exchange (ETDEWEB)

    1978-07-01

    This volume contains Biomedical and Environmental Research, Environmental Control Technology Research, and Operational and Environmental Safety Research project listings. The projects are ordered numerically by log number.

  8. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1995 quality program status report

    Energy Technology Data Exchange (ETDEWEB)

    Bolivar, S.L.

    1996-07-01

    This status report summarizes the activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project`s (YMP`s) quality assurance program for January 1 to September 30, 1995. The report includes major sections on program activities and trend analysis.

  9. Salt repository project closeout status report

    International Nuclear Information System (INIS)

    1988-06-01

    This report provides an overview of the scope and status of the US Department of Energy (DOE's) Salt Repository Project (SRP) at the time when the project was terminated by the Nuclear Waste Policy Amendments Act of 1987. The report reviews the 10-year program of siting a geologic repository for high-level nuclear waste in rock salt formations. Its purpose is to aid persons interested in the information developed during the course of this effort. Each area is briefly described and the major items of information are noted. This report, the three salt Environmental Assessments, and the Site Characterization Plan are the suggested starting points for any search of the literature and information developed by the program participants. Prior to termination, DOE was preparing to characterize three candidate sites for the first mined geologic repository for the permanent disposal of high-level nuclear waste. The sites were in Nevada, a site in volcanic tuff; Texas, a site in bedded salt (halite); and Washington, a site in basalt. These sites, identified by the screening process described in Chapter 3, were selected from the nine potentially acceptable sites shown on Figure I-1. These sites were identified in accordance with provisions of the Nuclear Waste Policy Act of 1982. 196 refs., 21 figs., 11 tabs

  10. Compilation of reports of the Advisory Committee on Reactor Safeguards, 1957-1984. Volume 1. Project Reviews A-F

    International Nuclear Information System (INIS)

    1985-04-01

    This six-volume compilation contains over 1000 reports prepared by the Advisory Committee on Reactor Safeguards from September 1957 through December 1984. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and within project name by chronological order. Part 2 categorizes the reports by the most appropriate generic subject area and within subject area by chronological order. This volume contains project reviews arranged alphabetically from A to F

  11. 94-1 Research and development project lead laboratory support. Status report, July 1, 1996--September 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Rink, N. [comp.

    1997-03-01

    This document reports status and technical progress for Los Alamos 94-1 Research and Development projects. Updated schedule charts are shown in the appendix. This is the fourth status report published for Los Alamos National Laboratory 94-1 Research and Development Project Support. The Department of Energy Office of Environmental Management (DOE/EM) funds these projects in order to support the storage or disposal of legacy plutonium and plutonium-bearing materials resulting from weapons production throughout the DOE complex. This document also serves as an end-for-year review of projects and positions the program for FY97.

  12. The technical status of the supersara project at its termination

    International Nuclear Information System (INIS)

    Markovina, A.; Randles, J.

    1987-01-01

    On March 10th 1983 the Council of Ministers of the European Community adopted the decision to abandon the SuperSARA project. In the frame of this decision, the Management of the SuperSARA project formulated the guidelines to close the project, which included the preparation of the present final report. This report presents the final status of the project, which means that it reflects the situation in March 1983, with a few updates introduced shortly afterwards in conformity with the safety requirements which were being revised at that time. The aim of this report is to give a general description of activities which were carried on to implement the experimental programme and to illustrate some important achievements reached in specific areas. In addition, it is also intended to provide the access key to the documentation which was produced in the past years, so as to make the most significant technical material easily available for any possible future use

  13. Bioimpedance Spectroscopy for Assessment of Volume Status in Patients before and after General Anaesthesia

    Science.gov (United States)

    Ernstbrunner, Matthäus; Kostner, Lisa; Kimberger, Oliver; Wabel, Peter; Säemann, Marcus; Markstaller, Klaus; Fleischmann, Edith; Kabon, Barbara; Hecking, Manfred

    2014-01-01

    Background Technically assisted assessment of volume status before surgery may be useful to direct intraoperative fluid administration. We therefore tested a recently developed whole-body bioimpedance spectroscopy device to determine pre- to postoperative fluid distribution. Methods Using a three-compartment physiologic tissue model, the body composition monitor (BCM, Fresenius Medical Care, Germany) measures total body fluid volume, extracellular volume, intracellular volume and fluid overload as surplus or deficit of ‘normal’ extracellular volume. BCM-measurements were performed before and after standardized general anaesthesia for gynaecological procedures (laparotomies, laparoscopies and vaginal surgeries). BCM results were blinded to the attending anaesthesiologist and data analysed using the 2-sided, paired Student’s t-test and multiple linear regression. Results In 71 females aged 45±15 years with body weight 67±13 kg and duration of anaesthesia 154±68 min, pre- to postoperative fluid overload increased from −0.7±1.1 L to 0.1±1.0 L, corresponding to −5.1±7.5% and 0.8±6.7% of normal extracellular volume, respectively (both p<0.001), after patients had received 1.9±0.9 L intravenous crystalloid fluid. Perioperative urinary excretion was 0.4±0.3 L. The increase in extracellular volume was paralleled by an increase in total body fluid volume, while intracellular volume increased only slightly and without reaching statistical significance (p = 0.15). Net perioperative fluid balance (administered fluid volume minus urinary excretion) was significantly associated with change in extracellular volume (r2 = 0.65), but was not associated with change in intracellular volume (r2 = 0.01). Conclusions Routine intraoperative fluid administration results in a significant, and clinically meaningful increase in the extracellular compartment. BCM-measurements yielded plausible results and may become useful to guide intraoperative fluid therapy in

  14. Status of parasitism in donkeys of project and control areas in ...

    African Journals Online (AJOL)

    The study was undertaken with the aim of comparing the status of parasitism in donkeys in the Donkey Health and welfare Project intervention (Bereh, Ada and Boset) and Control (Yekaduda, Gerado and Meki) areas of, Central Ethiopia, in 2005. Parasites are prime problem of donkeys among other problems including ...

  15. Renewable Resources: a national catalog of model projects. Volume 2. Mid-American Solar Energy Complex Region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-07-01

    This compilation of diverse conservation and renewable energy projects across the United States was prepared through the enthusiastic participation of solar and alternate energy groups from every state and region. Compiled and edited by the Center for Renewable Resources, these projects reflect many levels of innovation and technical expertise. In many cases, a critique analysis is presented of how projects performed and of the institutional conditions associated with their success or failure. Some 2000 projects are included in this compilation; most have worked, some have not. Information about all is presented to aid learning from these experiences. The four volumes in this set are arranged in state sections by geographic region, coinciding with the four Regional Solar Energy Centers. The table of contents is organized by project category so that maximum cross-referencing may be obtained. This volume includes information on the Mid-American Solar Energy Complex Region. (WHK)

  16. Solid low-level radioactive waste volume projections at Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Art, K.; Minton-Hughes, J.; Peper, C.

    1995-01-01

    In response to regulatory requirements, the current economic environment, and diminishing on-site low-level radioactive waste (LLW) disposal capacity, LANL needed to develop a system to collect data on future LLW generation that would comply with DOE Order 5820. 2A and be an effective facility planning tool. The LANL Volume Projections Project (VPP) was created to meet these needs. This paper describes objectives, scope, and components of the VPP that will provide information essential to future facility planning and development

  17. Guidance and Control Software Project Data - Volume 4: Configuration Management and Quality Assurance Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes configuration management and quality assurance documents from the GCS project. Volume 4 contains six appendices: A. Software Accomplishment Summary for the Guidance and Control Software Project; B. Software Configuration Index for the Guidance and Control Software Project; C. Configuration Management Records for the Guidance and Control Software Project; D. Software Quality Assurance Records for the Guidance and Control Software Project; E. Problem Report for the Pluto Implementation of the Guidance and Control Software Project; and F. Support Documentation Change Reports for the Guidance and Control Software Project.

  18. 94-1 Research and development project lead laboratory support. Status report, January 1--March 31, 1996

    International Nuclear Information System (INIS)

    Dinehart, M.

    1996-09-01

    This document reports status and technical progress for Los Alamos National Laboratories 94-1 Research and Development projects. An introduction to the project structure and an executive summary are included. Projects described include Electrolytic Decontamination, Combustibles, Detox, Sand, Slag, and Crucible, Surveillance, and Core Technology

  19. User's guide for PRISM (Plant Risk Status Information Management System) Arkansas Nuclear One-Unit 1: Volume 1, Program for inspectors

    Energy Technology Data Exchange (ETDEWEB)

    Campbell, D.J.; Guthrie, V.H.; Kirchner, J.R.; Kirkman, J.Q.; Paula, H.M.; Ellison, B.C.; Dycus, F.M.; Farquharson, J.A.; Flanagan, G.F.

    1988-03-01

    This user's guide is a two-volume document designed to teach NRC inspectors and NRC regulators how to access probabilistic risk assessment information from the two Plant Risk Status Information Management System (PRISIM) programs developed for Arkansas Nuclear One -- Unit One (ANO-1). This document, Volume 1, describes how the PRA information available in Version 1.0 of PRISIM is useful for planning inspections. Using PRISIM, inspectors can quickly access PRA information and use that information to update risk analysis results, reflecting a plant's status at any particular time. Both volumes are stand-alone documents, and each volume presents several sample computer sessions designed to lead the user through a variety of PRISIM applications used to obtain PRA-related information for monitoring and controlling plant risk.

  20. Estimation of the 3D positioning of anatomic structures from radiographic projection and volume knowledge

    Energy Technology Data Exchange (ETDEWEB)

    Bifulco, P; Cesarelli, M; Roccasalva Firenze, M; Verso, E; Sansone, M; Bracale, M [University of Naples, Federico II, Electronic Engineering Department, Bioengineering Unit, Via Claudio, 21 - 80125 Naples (Italy)

    1999-12-31

    The aim of this study is to develop a method to estimate the 3D positioning of an anatomic structure using the knowledge of its volume (provided by CT or MRI) combined with a single radiographic projection. This method could be applied in stereotactic surgery or in the study of 3D body joints kinematics. The knowledge of the 3D anatomical structure, available from CT (or in future MRI) is used to estimate the orientation of the projection that better match the actual 2D available projection. For this purpose it was necessary to develop an algorithm to simulate the radiographic projections. The radiographic image formation process has been simulated utilizing the geometrical characteristics of a real radiographic device and the volumetric anatomical data of the patient, obtained by 3D diagnostic CT images. The position of the patient volume respect to the radiological device is estimated comparing the actual radiographic projection with those simulated, maximising a similarity index. To assess the estimation, the 3D positioning of a segmented vertebra has been used as a test volume. The assessment has been carried out only by means of simulation. Estimation errors have been statistically evaluated. Conditions of mispositioning and noise have been also considered. The results relative to the simulation show the feasibility of the method. From the analysis of the errors emerges that the searching procedure results robust respect to the addition of white Gaussian noise. (authors) 13 fers., 4 figs., 1 tabs.

  1. Estimation of the 3D positioning of anatomic structures from radiographic projection and volume knowledge

    International Nuclear Information System (INIS)

    Bifulco, P.; Cesarelli, M.; Roccasalva Firenze, M.; Verso, E.; Sansone, M.; Bracale, M.

    1998-01-01

    The aim of this study is to develop a method to estimate the 3D positioning of an anatomic structure using the knowledge of its volume (provided by CT or MRI) combined with a single radiographic projection. This method could be applied in stereotactic surgery or in the study of 3D body joints kinematics. The knowledge of the 3D anatomical structure, available from CT (or in future MRI) is used to estimate the orientation of the projection that better match the actual 2D available projection. For this purpose it was necessary to develop an algorithm to simulate the radiographic projections. The radiographic image formation process has been simulated utilizing the geometrical characteristics of a real radiographic device and the volumetric anatomical data of the patient, obtained by 3D diagnostic CT images. The position of the patient volume respect to the radiological device is estimated comparing the actual radiographic projection with those simulated, maximising a similarity index. To assess the estimation, the 3D positioning of a segmented vertebra has been used as a test volume. The assessment has been carried out only by means of simulation. Estimation errors have been statistically evaluated. Conditions of mispositioning and noise have been also considered. The results relative to the simulation show the feasibility of the method. From the analysis of the errors emerges that the searching procedure results robust respect to the addition of white Gaussian noise. (authors)

  2. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1993 Quality Program status report

    International Nuclear Information System (INIS)

    Boliver, S.L.

    1995-05-01

    This status report is for calendar year 1993. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory (Los Alamos) Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, we establish a baseline that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify long term trends and to evaluate improvements. This is the third annual status report (Bolivar, 1992; Bolivar, 1994). This report is divided into two primary sections: Program Activities and Trend Analysis. Under Program Activities, programmatic issues occurring in 1993 are discussed. The goals for 1993 are also listed, followed by a discussion of their status. Lastly, goals for 1994 are identified. The Trend Analysis section is a summary of 1993 quarterly trend reports and provides a good overview of the quality assurance issues of the Los Alamos YMP

  3. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1993 Quality Program status report

    Energy Technology Data Exchange (ETDEWEB)

    Bolivar, S.L.

    1995-05-01

    This status report is for calendar year 1993. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory (Los Alamos) Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, we establish a baseline that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify long term trends and to evaluate improvements. This is the third annual status report (Bolivar, 1992; Bolivar, 1994). This report is divided into two primary sections: Program Activities and Trend Analysis. Under Program Activities, programmatic issues occurring in 1993 are discussed. The goals for 1993 are also listed, followed by a discussion of their status. Lastly, goals for 1994 are identified. The Trend Analysis section is a summary of 1993 quarterly trend reports and provides a good overview of the quality assurance issues of the Los Alamos YMP.

  4. Short status report on EFF and EAF projects

    International Nuclear Information System (INIS)

    Gruppelaar, H.

    1991-10-01

    A short status report is given on the European Fusion File (EFF) and European Activation File (EAF) projects. The EFF-2 data file is nearly finished and processing and benchmarking is underway. There is also a second version (EAF-2) of the activation file which is a very extensive and complete data base. Recently follow-up programmes have been defined for the introduction of EFF-2 to the user community after benchmarking and for further improvement of the quality of the two data files. There is extensive international cooperation, which is becoming increasingly important to solve remaining difficult problems. (author). 17 refs

  5. Projections for the Production of Bulk Volume Bio-Based Polymers in Europe and Environmental Implications

    NARCIS (Netherlands)

    Patel, M.K.; Crank, M.

    2007-01-01

    In this paper we provide an overview of the most important emerging groups of bio-based polymers for bulk volume applications and we discuss market projections for these types of bio-based polymers in the EU, thereby distinguishing between three scenarios. Bio-based polymers are projected to reach a

  6. Compilation of reports of the Advisory Committee on Reactor Safeguards, 1957-1984. Volume 3. Project Reviews Q-Z

    International Nuclear Information System (INIS)

    1985-04-01

    This six-volume compilation contains over 1000 reports prepared by the Advisory Committee on Reactor Safeguards from September 1957 through December 1984. The reports are divided into two groups: Part 1: ACRS Resports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and within project name by chronological order. Part 2 categorizes the reports by the most appropriate generic subject area and within subject area by chronological order. This volume includes reports arranged alpbabetically from Q to Z

  7. Inventory of Federal energy-related environment and safety research for FY 1979. Volume II. Project listings and indexes

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-01

    This volume contains summaries of FY 1979 government-sponsored environment and safety research related to energy arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each contributing agency. Information elements included in the summary listings are project title, principal investigators, research organization, project number, contract number, supporting organization, funding level, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in the back of this volume.

  8. Inventory of Federal energy-related environment and safety research for FY 1979. Volume II. Project listings and indexes

    International Nuclear Information System (INIS)

    1980-12-01

    This volume contains summaries of FY 1979 government-sponsored environment and safety research related to energy arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each contributing agency. Information elements included in the summary listings are project title, principal investigators, research organization, project number, contract number, supporting organization, funding level, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in the back of this volume

  9. Ground-water monitoring compliance projects for Hanford Site Facilities: Progress report for the period April 1--June 30, 1988: Volume 1, Text

    International Nuclear Information System (INIS)

    1988-09-01

    This is Volume 1 of a two-volume set of documents that describes the progress of 10 Hanford Site ground-water monitoring projects for the period April 1 to June 30, 1988. This volume discusses the projects; Volume 2 provides as-built diagrams, drilling logs, and geophysical logs for wells drilled during this period in the 100-N Area and near the 216-A-36B Crib

  10. Bioimpedance spectroscopy for assessment of volume status in patients before and after general anaesthesia.

    Directory of Open Access Journals (Sweden)

    Matthäus Ernstbrunner

    Full Text Available BACKGROUND: Technically assisted assessment of volume status before surgery may be useful to direct intraoperative fluid administration. We therefore tested a recently developed whole-body bioimpedance spectroscopy device to determine pre- to postoperative fluid distribution. METHODS: Using a three-compartment physiologic tissue model, the body composition monitor (BCM, Fresenius Medical Care, Germany measures total body fluid volume, extracellular volume, intracellular volume and fluid overload as surplus or deficit of 'normal' extracellular volume. BCM-measurements were performed before and after standardized general anaesthesia for gynaecological procedures (laparotomies, laparoscopies and vaginal surgeries. BCM results were blinded to the attending anaesthesiologist and data analysed using the 2-sided, paired Student's t-test and multiple linear regression. RESULTS: In 71 females aged 45 ± 15 years with body weight 67 ± 13 kg and Duration of anesthesia 154 ± 69 minutes [corrected] duration of anaesthesia 154 ± 68 min, pre- to postoperative fluid overload increased from -0.7 ± 1.1 L to 0.1 ± 1.0 L, corresponding to -5.1 ± 7.5% and 0.8 ± 6.7% of normal extracellular volume, respectively (both p<0.001, after patients had received 1.9 ± 0.9 L intravenous crystalloid fluid. Perioperative urinary excretion was 0.3 ± 0.2 L [corrected]. The increase in extracellular volume was paralleled by an increase in total body fluid volume, while intracellular volume increased only slightly and without reaching statistical significance (p = 0.15. Net perioperative fluid balance (administered fluid volume minus urinary excretion was significantly associated with change in extracellular volume (r(2 = 0.65, but was not associated with change in intracellular volume (r(2 = 0.01. CONCLUSIONS: Routine intraoperative fluid administration results in a significant, and clinically meaningful increase in the extracellular compartment. BCM-measurements yielded

  11. The current status of emergency operations at a high-volume cancer center.

    Science.gov (United States)

    Komori, Koji; Kimura, Kenya; Kinoshita, Takashi; Ito, Seiji; Abe, Tetsuya; Senda, Yoshiki; Misawa, Kazunari; Ito, Yuichi; Uemura, Norihisa; Natsume, Seiji; Kawai, Ryosuke; Kawakami, Jiro; Asano, Tomonari; Iwata, Yoshinori; Kurahashi, Shintaro; Tsutsuyama, Masayuki; Shigeyoshi, Itaru; Shimizu, Yasuhiro

    2014-01-01

    This study aimed to assess the pathogenic causes, clinical conditions, surgical procedures, in-hospital mortality, and operative death associated with emergency operations at a high-volume cancer center. Although many reports have described the contents, operative procedures, and prognosis of elective surgeries in high-volume cancer centers, emergency operations have not been studied in sufficient detail. We retrospectively enrolled 28 consecutive patients who underwent emergency surgery. Cases involving operative complications were excluded. The following surgical procedures were performed during emergency operations: closure in 3 cases (10.7%), diversion in 22 cases (78.6%), ileus treatment in 2 cases (7.1%), and hemostasis in 1 case (3.6%). Closure alone was performed only once for peritonitis. Diversion was performed in 17 cases (77.3%) of peritonitis, 4 cases (18.2%) of stenosis of the gastrointestinal tract, and 1 case (4.5%) of bleeding. There was a significant overall difference (P = 0.001). The frequency of emergency operations was very low at a high-volume cancer center. However, the recent shift in treatment approaches toward nonoperative techniques may enhance the status of emergency surgical procedures. The results presented in this study will help prepare for emergency situations and resolve them as quickly and efficiently as possible.

  12. From demonstration projects to volume market : Market development for advanced housing renovation

    NARCIS (Netherlands)

    Mlecnik, E.; Prendergast, E.; Rodsjo, A.; Haavik, T.; Parker, P.

    2010-01-01

    How do we get from demonstration projects to a volume market for very low energy demand in advanced housing renovation? The contributors to this report have been working with this issue for many years. Some worked in both IEA SHC Task 28 Sustainable Housing (2000-2005) and in SHC Task 37 Advanced

  13. ASEAN--USAID Buildings Energy Conservation Project final report. Volume 2, Technology

    Energy Technology Data Exchange (ETDEWEB)

    Levine, M.D.; Busch, J.F. [eds.

    1992-06-01

    This volume reports on research in the area of energy conservation technology applied to commercial buildings in the Association of Southeast Asian Nations (ASEAN) region. Unlike Volume I of this series, this volume is a compilation of original technical papers prepared by different authors in the project. In this regard, this volume is much like a technical journal. The papers that follow report on research conducted by both US and ASEAN researchers. The authors representing Indonesia, Malaysia, Philippines, and Thailand, come from a range of positions in the energy arena, including government energy agencies, electric utilities, and universities. As such, they account for a wide range of perspectives on energy problems and the role that technology can play in solving them. This volume is about using energy more intelligently. In some cases, the effort is towards the use of more advanced technologies, such as low-emittance coatings on window glass, thermal energy storage, or cogeneration. In others, the emphasis is towards reclaiming traditional techniques for rendering energy services, but in new contexts such as lighting office buildings with natural light, or cooling buildings of all types with natural ventilation. Used in its broadest sense, the term ``technology`` encompasses all of the topics addressed in this volume. Along with the more customary associations of technology, such as advanced materials and equipment and the analysis of their performance, this volume treats design concepts and techniques, analysis of ``secondary`` impacts from applying technologies (i.e., unintended impacts, or impacts on parties not directly involved in the purchase and use of the technology), and the collection of primary data used for conducting technical analyses.

  14. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  15. Breckinridge Project, initial effort. Report III, Volume 2. Specifications

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    Report III, Volume 2 contains those specifications numbered K through Y, as follows: Specifications for Compressors (K); Specifications for Piping (L); Specifications for Structures (M); Specifications for Insulation (N); Specifications for Electrical (P); Specifications for Concrete (Q); Specifications for Civil (S); Specifications for Welding (W); Specifications for Painting (X); and Specifications for Special (Y). The standard specifications of Bechtel Petroleum Incorporated have been amended as necessary to reflect the specific requirements of the Breckinridge Project and the more stringent specifications of Ashland Synthetic Fuels, Inc. These standard specifications are available for the Initial Effort (Phase Zero) work performed by all contractors and subcontractors.

  16. Inventory of Federal energy-related environment and safety research for FY 1978. Volume II. Project listings and indexes

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-12-01

    This volume contains summaries of FY-1978 government-sponsored environment and safety research related to energy. Project summaries were collected by Aerospace Corporation under contract with the Department of Energy, Office of Program Coordination, under the Assistant Secretary for Environment. Summaries are arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each agency. Information about the projects is included in the summary listings. This includes the project title, principal investigators, research organization, project number, contract number, supporting organization, funding level if known, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in Volume IV.

  17. Inventory of Federal energy-related environment and safety research for FY 1978. Volume II. Project listings and indexes

    International Nuclear Information System (INIS)

    1979-12-01

    This volume contains summaries of FY-1978 government-sponsored environment and safety research related to energy. Project summaries were collected by Aerospace Corporation under contract with the Department of Energy, Office of Program Coordination, under the Assistant Secretary for Environment. Summaries are arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each agency. Information about the projects is included in the summary listings. This includes the project title, principal investigators, research organization, project number, contract number, supporting organization, funding level if known, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in Volume IV

  18. Slope excavation quality assessment and excavated volume calculation in hydraulic projects based on laser scanning technology

    Directory of Open Access Journals (Sweden)

    Chao Hu

    2015-04-01

    Full Text Available Slope excavation is one of the most crucial steps in the construction of a hydraulic project. Excavation project quality assessment and excavated volume calculation are critical in construction management. The positioning of excavation projects using traditional instruments is inefficient and may cause error. To improve the efficiency and precision of calculation and assessment, three-dimensional laser scanning technology was used for slope excavation quality assessment. An efficient data acquisition, processing, and management workflow was presented in this study. Based on the quality control indices, including the average gradient, slope toe elevation, and overbreak and underbreak, cross-sectional quality assessment and holistic quality assessment methods were proposed to assess the slope excavation quality with laser-scanned data. An algorithm was also presented to calculate the excavated volume with laser-scanned data. A field application and a laboratory experiment were carried out to verify the feasibility of these methods for excavation quality assessment and excavated volume calculation. The results show that the quality assessment indices can be obtained rapidly and accurately with design parameters and scanned data, and the results of holistic quality assessment are consistent with those of cross-sectional quality assessment. In addition, the time consumption in excavation quality assessment with the laser scanning technology can be reduced by 70%–90%, as compared with the traditional method. The excavated volume calculated with the scanned data only slightly differs from measured data, demonstrating the applicability of the excavated volume calculation method presented in this study.

  19. Actual status of project Mochovce NPP units 3 and 4 completion

    International Nuclear Information System (INIS)

    Niznan, S.

    2005-01-01

    In this presentation author deals with actual status of project Mochovce NPP units 3 and 4 completion. Present state of Mochovce NPP, Units 3 and 4 enables real assumption to completion. It is expected that such supplier companies can be used which are experienced in field of nuclear projects. Based on budget of 2002, it seems that completion costs of 45 billions SKK are real. These figures were confirmed by study performed by TRACTEBEL in 2004. Based on experience from Bohunice NPP completion as well as from Mochovce NPP, Units 1 and 2 completion and if decision milestone and project start up deadlines will be observed according to modified preliminary schedule of Mochovce NPP Units 3 and 4 completion, it seems as real that Unit 3 will be completed till 06/2011 and Unit 4 - till 12/2011.

  20. Savannah River Plant engineering, design, and construction history of ``S`` projects and other work, January 1961--December 1964. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1970-03-01

    The work described in this volume of ``S`` Projects History is an extension of the type of work described in Volume I. E.I. du Pont de flemours & Company had entered into Contract AT (07-2)-l with the United States Atomic Energy Commission to develop, design, construct, install, and operate facilities to produce heavy water, fissionable materials, and related products. Under this contract,, Du Pont constructed and operated the Savannah River Plant. The engineering, design, and construction for most of the larger ``S`` projects was performed by the Engineering DeDartment. For some of the large and many of the smaller projects the Engineering Department was responsible only for the construction because the Atomic Energy Division (AED) of the Explosives Department handled the other phases. The Engineering Department Costruction Division also performed the physical work for many of the plant work orders. This volume includes a general description of the Du Pont Engineering Department activities pertaining to the engineering, design, and construction of the ``S`` projects at the Savannah River Plant; brief summaries of the projects and principal work requests; and supplementary informaticn on a few subjects in Volume I for which final data was not available at the closing date. Projects and other plant engineering work which were handled entirely by the Explosives Department -- AED are not included in this history.

  1. The PEP-II Project: Low-Energy Ring Design and Project Status

    International Nuclear Information System (INIS)

    Zisman, Michael S.

    2006-01-01

    We describe the present status of the PEP-II project. The project comprises four major systems: Injector, High-Energy Ring (HER), Low-Energy Ring (LER), and Interaction Region (IR). We focus in detail on the design of the LER, as its parameters and requirements are most closely related to those required for the Beijing Tau-Charm Factory rings. The PEP-II LER is a high-current, 3.1-GeV positron ring mounted above the 9-GeV HER. The LER uses a wiggler located in one of its six straight sections to provide emittance control and additional damping. We describe the rather complicated IR, which must transport the LER beam into the plane of the HER, focus it to a common beam size, and separate the beams after the head-on collisions. Both permanent magnet and conventional electromagnets are used in this area. The LER lattice has now adopted a simplified non-interleaved sextupole correction scheme that has reduced the required number of sextupoles substantially. We describe the LER vacuum system, one of the most challenging subsystems in PEP-II. It employs several technologies. In the arcs, aluminum extrusions and titanium sublimation pumps are employed; the straight sections use stainless steel chambers with lumped ion pumps. In the wiggler area, an extended copper photon dump with nonevaporable getter (NEG) pumps is employed to handle the very large synchrotron radiation power. The design of the room-temperature RF system, the bunch-by-bunch longitudinal and transverse feedback systems, and some of the special diagnostics will be described briefly. The PEP-II project remains on schedule to begin commissioning of the HER in April 1997, followed by the LER a year later

  2. Status of SPIRAL. The radioactive beam project at GANIL

    International Nuclear Information System (INIS)

    Lieuvin, M.

    1995-01-01

    SPIRAL, a radioactive ion beam facility (RIB) is under construction at GANIL (Caen, France). The heavy ion beams of GANIL will be used to produce radioactive atoms by the ISOL method. After ionisation by an ECR ion source (ECRIS), the low energy radioactive beam is axially injected on the first orbit of a k=265 compact cyclotron. The final energy will range between 1.7 and 25 MeV/u (harmonics 5 to 2) and the accelerated ions will be sent to the existing GANIL experimental areas. The present status of the project is described. (author)

  3. Technical Assistance in Evaluating Career Education Projects. Final Report. Volume II: Final Career Education Evaluation Report.

    Science.gov (United States)

    Stenner, A. Jackson; And Others

    This document contains the second of five volumes reporting the activities and results of a career education evaluation project conducted to accomplish the following two objectives: (1) to improve the quality of evaluations by career education projects funded by the United States Office of Career Education (OCE) through the provision of technical…

  4. CURRENT STATUS OF RESEARCH PROJECT ACTIVITIES IN MEDICAL UNIVERSITIES IN BULGARIA.

    Directory of Open Access Journals (Sweden)

    Svetoslav Garov

    2013-07-01

    Full Text Available Introduction: In Bulgaria there are five medical universities: in the cities of Sofia, Plovdiv, Varna, Pleven and Stara Zagora. Their main mission is training specialists in the fields of medicine and health care, increasing their qualification by means of postgraduate education and performing research activities. One of medical universities’ top priorities is encouraging research activities mainly aimed at preparation and implementation of research projects. Aim: The purpose of our study is to examine the current status of research project activities in Bulgarian medical universities.Material and methods: In order to define the science competitions related to Bulgarian medical universities we have applied a documentary and sociological approach. Results: Research projects that Bulgarian medical universities can apply for are divided into two groups – national and international. The most significant international projects are European ones since Bulgaria is an EU member state and this allows us to participate in such projects. Conclusion: Universities should strive for establishing even better conditions for encouraging application for research projects aimed at developing competent and experienced staff, even though the majority of them may not obtain approval for financing.The changes in the situation regarding Bulgarian science require the implementation and development of more research staff motivated to improve their knowledge and skills in the relevant dynamically changing competition and project field.

  5. New capacity and the status of major projects

    International Nuclear Information System (INIS)

    Osborne, R.; Eastman, P.; Bajc, F.; Hawthorne, D.

    2003-01-01

    This session included highlights from from four guest speakers who were asked to comment on new electricity capacity in Ontario and the status of major projects. The summer of 2002 was one of the hottest on record in Ontario and presented a challenge for suppliers of electricity to meet demand. Some of the extra demand was met by interties. Imports provided 5 per cent of consumption in July and 8 per cent in August. TransAlta and ATCO are currently involved in 2 major projects to add generation capacity. In addition, Ontario Power Generation is getting more production from its existing nuclear plants and has made significant investment to get greater efficiency and increase safety margins at the plants. One panelist suggested that nuclear power is a key part of meeting Canada's Kyoto greenhouse reduction obligations. It was emphasized that market participants should allow time to let the market work and let a free market respond to price signals. It was argued that consumers expect and rely too much on low-cost electricity and are therefore not encouraged to conserve energy or look into new generation requirements. figs

  6. Alligator Rivers Analogue Project. Final Report - Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Duerden, P [Australian Nuclear Science and Technology Organisation (ANSTO), Lucas Heights, NSW (Australia); Lever, D A [AEA Technology, Harwell (United Kingdom); Sverjensky, D A [Johns Hopkins Univ., Baltimore, MD (United States); Townley, L R [Commonwealth Scientific and Industrial Research Organisation (CSIRO), Wembley, WA (Australia). Div. of Water Resources

    1992-07-01

    This summary report, which highlights the work and findings of the Alligator Rivers Analogue Project (ARAP) is one of a series of 16 volumes, listed below. Detailed descriptions and results are provided in Volumes 2 to 16. Full acknowledgment to individual contributions is provided in the individual reports, and in Appendix I of this report. The findings from the technical studies are discussed in the context of assessments of the long-term performance of geological repositories for radioactive wastes, which are being undertaken in many countries. They are also considered in an integrated 'Scenario Development' approach, aimed to understand the formation of the ore deposit. Despite their inherent uncertainties, the findings provide a basis for assessing the way in which radionuclides will migrate in environments with a variety of geologic settings and over a range of different geologic timescales. Thus, section 2 of this report discusses the concept of using uranium deposits as natural analogues and refers to a number of such studies, including those at the Koongarra deposit in the Alligator Rivers Region of the Northern Territory of Australia. Section 3 reviews early scientific work in the Alligator Rivers Region and summarises the results of the analogue studies undertaken between 1981 and 1987 that were funded by the US Nuclear Regulatory Commission (USNRC) and the UK Department of the Environment (UKDoE). Section 4 describes the objectives of ARAP and the manner in which the study was conducted and provides a general outline of the project and a summary of the findings. A general description of the Koongarra ore deposit, the focus of ARAP, is provided in Section 5, with Sections 6-13 providing summaries of the work carried out to characterise the site in detail and provide data for modelling. Sections 14-18 discuss how this data was used in modelling and how the results may be applied for performance assessment studies. Finally, Section 19 considers the

  7. Alligator Rivers Analogue Project. Final Report - Volume 1

    International Nuclear Information System (INIS)

    Duerden, P.; Lever, D.A.; Sverjensky, D.A.; Townley, L.R.

    1992-01-01

    This summary report, which highlights the work and findings of the Alligator Rivers Analogue Project (ARAP) is one of a series of 16 volumes, listed below. Detailed descriptions and results are provided in Volumes 2 to 16. Full acknowledgment to individual contributions is provided in the individual reports, and in Appendix I of this report. The findings from the technical studies are discussed in the context of assessments of the long-term performance of geological repositories for radioactive wastes, which are being undertaken in many countries. They are also considered in an integrated 'Scenario Development' approach, aimed to understand the formation of the ore deposit. Despite their inherent uncertainties, the findings provide a basis for assessing the way in which radionuclides will migrate in environments with a variety of geologic settings and over a range of different geologic timescales. Thus, section 2 of this report discusses the concept of using uranium deposits as natural analogues and refers to a number of such studies, including those at the Koongarra deposit in the Alligator Rivers Region of the Northern Territory of Australia. Section 3 reviews early scientific work in the Alligator Rivers Region and summarises the results of the analogue studies undertaken between 1981 and 1987 that were funded by the US Nuclear Regulatory Commission (USNRC) and the UK Department of the Environment (UKDoE). Section 4 describes the objectives of ARAP and the manner in which the study was conducted and provides a general outline of the project and a summary of the findings. A general description of the Koongarra ore deposit, the focus of ARAP, is provided in Section 5, with Sections 6-13 providing summaries of the work carried out to characterise the site in detail and provide data for modelling. Sections 14-18 discuss how this data was used in modelling and how the results may be applied for performance assessment studies. Finally, Section 19 considers the

  8. Status of safety issues at licensed power plants

    International Nuclear Information System (INIS)

    1991-05-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, a program has been established whereby an annual NUREG report will be published on the status of licensee implementation and NRC verification of safety issues in major NRC requirement areas. This report, the second volume of a three-volume series, addresses the status of unresolved safety issues (USIs) at licensed plants. The data contained in these NUREG reports are a product of the NRC's Safety Issues Management System (SIMS) database, which is maintained by the Project Management Staff in the Office of Nuclear Reactor Regulation and by NRC regional personnel. The purpose of this report is to provide a comprehensive description of the status of implementation and verification of the 27 safety issues designated as USIs and to make this information available to other interested parties, including the public. A corollary purpose of this NUREG report is to serve as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues up until requirements are approved for imposition at licensed plants. 3 figs., 4 tabs

  9. Western Gas Sands Project. Status report, 1 June--30 June 1979

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    This edition of the WGSP status report summarizes June 1979 progress of government-sponsored projects directed toward increasing gas production from the low-permeability gas sands of the western United States. Background information is provided in the September 1977, status report, NVO/0655-100. Work by the USGS toward resource assessment in the four primary study areas continued. CK GeoEnergy started a core hole in Grand County, Utah. During June, projects of the National Laboratories and Energy Technology Centers continued. Bartlesville Energy Technology Center continued work on fracture conductivity, rock-fluid interaction, and log evaluation and interpretation techniques. Experimental and theoretical work on hydraulic fracturing mechanics and analysis of well test data continued at Lawrence Livermore Laboratory. The CER Corporation RB-MHF 3 final report has been distributed. Cyclic gas injection began again on CIG's Sprague No. 1 well. The DOE well test facility was transported to Vernal, Utah for minor repairs and storage. The GPE wells, Natural Buttes Units 9, 14 and 18 flowed to sales. The Mitchell Energy Muse-Duke No. 1 well flowed 3,000 MCFD in June. Attempts to kill the Mobil PCU F31-13G well failed. Exploratory coring of the Sandia Hole No. 6 Formation Interface Fracture Experiment resumed in June.

  10. Tampa Electric Company Polk Power Station IGCC project: Project status

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D. [Tampa Electric Co., FL (United States)

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  11. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1995 quality program status report

    International Nuclear Information System (INIS)

    Bolivar, S.L.

    1996-07-01

    This status report summarizes the activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project's (YMP's) quality assurance program for January 1 to September 30, 1995. The report includes major sections on program activities and trend analysis

  12. Operational waste volume projection

    International Nuclear Information System (INIS)

    Koreski, G.M.; Strode, J.N.

    1995-06-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the tri-party agreement. Assumptions are current as of June 1995

  13. Operational Waste Volume Projection

    Energy Technology Data Exchange (ETDEWEB)

    STRODE, J.N.

    2000-08-28

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

  14. Operational Waste Volume Projection

    International Nuclear Information System (INIS)

    STRODE, J.N.

    2000-01-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000

  15. Implementation status of the extreme light infrastructure - nuclear physics (ELI-NP) project

    Energy Technology Data Exchange (ETDEWEB)

    Gales, S., E-mail: sydney.gales@eli-np.ro; Zamfir, N. V., E-mail: sydney.gales@eli-np.ro [ELI-NP, Horia Hulubei National Institute for Physics and Nuclear Engineering, 30 Reactorului Street, RO-077125 Bucharest-Magurele (Romania)

    2015-02-24

    The Project Extreme Light Infrastructure (ELI) is part of the European Strategic Forum for Research Infrastructures (ESFRI) Roadmap. ELI will be built as a network of three complementary pillars at the frontier of laser technologies. The ELI-NP pillar (NP for Nuclear Physics) is under construction near Bucharest (Romania) and will develop a scientific program using two 10 PW lasers and a Compton back-scattering high-brilliance and intense gamma beam, a marriage of laser and accelerator technology at the frontier of knowledge. In the present paper, the technical description of the facility, the present status of the project as well as the science, applications and future perspectives will be discussed.

  16. Direct and Indirect Effects of Brain Volume, Socioeconomic Status and Family Stress on Child IQ

    Science.gov (United States)

    Marcus Jenkins, Jade V; Woolley, Donald P; Hooper, Stephen R; De Bellis, Michael D

    2013-01-01

    1.1. Background A large literature documents the detrimental effects of socioeconomic disparities on intelligence and neuropsychological development. Researchers typically measure environmental factors such as socioeconomic status (SES), using income, parent's occupation and education. However, SES is more complex, and this complexity may influence neuropsychological outcomes. 1.2. Methods This studyused principal components analysis to reduce 14 SES and 28 family stress indicators into their core dimensions (e.g. community and educational capital, financial resources, marital conflict). Core dimensions were used in path analyses to examine their relationships with parent IQ and cerebral volume (white matter, grey matter and total brain volume), to predict child IQ in a sample of typically developing children. 1.3. Results Parent IQ affected child IQ directly and indirectly through community and educational capital, demonstrating how environmental factors interact with familial factors in neuro-development. There were no intervening effects of cerebral white matter, grey matter, or total brain volume. 1.4. Conclusions Findings may suggest that improving community resources can foster the intellectual development of children. PMID:24533427

  17. Los Alamos National Laboratory Yucca Mountain Site Characterization Project: 1991 quality program status report

    International Nuclear Information System (INIS)

    1992-07-01

    This status report summarizes the activities and accomplishments of the Los Alamos National Laboratory (Los Alamos) Yucca Mountain Site Characterization Project's (YMP) quality assurance program for calendar year 1991. The report is divided into three Sections: Program Activities, Verification Activities, and Trend Analysis

  18. Engineered materials characterization report for the Yucca Mountain Site Characterization Project. Volume 3: Corrosion and data modeling

    International Nuclear Information System (INIS)

    Van Konynenburg, R.A.; McCright, R.D.; Roy, A.K.; Jones, D.A.

    1995-08-01

    This three-volume report serves several purposes. The first volume provides an introduction to the engineered materials effort for the Yucca Mountain Site Characterization Project. It defines terms and outlines the history of selection and characterization of these materials. A summary of the recent engineered barrier materials characterization workshop is presented, and the current candidate materials are listed. The second volume tabulates design data for engineered materials, and the third volume is devoted to corrosion data, radiation effects on corrosion, and corrosion modeling. The second and third volumes are intended to be evolving documents, to which new data will be added as they become available from additional studies. The initial version of Volume 3 is devoted to information currently available for environments most similar to those expected in the potential Yucca Mountain repository. This is volume three

  19. LIFAC sorbent injection desulfurization demonstration project. Final report, volume II: Project performance and economics

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This publication discusses the demonstration of the LIFAC sorbent injection technology at Richmond Power and Light`s Whitewater Valley Unit No. 2, performed under the auspices of the U.S. Department of Energy`s (DOE) Clean Coal Technology Program. LIFAC is a sorbent injection technology capable of removing 75 to 85 percent of a power plant`s SO{sub 2} emissions using limestone at calcium to sulfur molar ratios of between 2 and 2.5 to 1. The site of the demonstration is a coal-fired electric utility power plant located in Richmond, Indiana. The project is being conducted by LIFAC North America (LIFAC NA), a joint venture partnership of Tampella Power Corporation and ICF Kaiser Engineers, in cooperation with DOE, RP&L, and Research Institute (EPRI), the State of Indiana, and Black Beauty Coal Company. The purpose of Public Design Report Volume 2: Project Performance and Economics is to consolidate, for public use, the technical efficiency and economy of the LIFAC Process. The report has been prepared pursuant to the Cooperative Agreement No. DE-FC22-90PC90548 between LIFAC NA and the U.S. Department of Energy.

  20. Clean coal technology project to Polk Power Station, Tampa Electric Company, Florida, Volume 1: Report

    International Nuclear Information System (INIS)

    1994-06-01

    Tampa Electric Company proposes to construct and operate a 1,150-MW power station in southwestern Polk County, Florida. The proposed Polk Power Station would require an EPA NPDES permit for a new source and would include a 260-MW IGCC unit as a DOE Clean Coal Technology demonstration project. This EIS document assesses the proposed project and alternatives with respect to environmental impacts. Mitigative measures are also evaluated for the preferred alternative. Included in this Volume I are the following: alternatives including Tampa Electric Companies proposed project (preferred alternative with DOE financial assistance); affected environment; environmental consequences of the alternatives

  1. Rapid jetting status inspection and accurate droplet volume measurement for a piezo drop-on-demand inkjet print head using a scanning mirror for display applications

    Science.gov (United States)

    Shin, Dong-Youn; Kim, Minsung

    2017-02-01

    Despite the inherent fabrication simplicity of piezo drop-on-demand inkjet printing, the non-uniform deposition of colourants or electroluminescent organic materials leads to faulty display products, and hence, the importance of rapid jetting status inspection and accurate droplet volume measurement increases from a process perspective. In this work, various jetting status inspections and droplet volume measurement methods are reviewed by discussing their advantages and disadvantages, and then, the opportunities for the developed prototype with a scanning mirror are explored. This work demonstrates that jetting status inspection of 384 fictitious droplets can be performed within 17 s with maximum and minimum measurement accuracies of 0.2 ± 0.5 μ m for the fictitious droplets of 50 μ m in diameter and -1.2 ± 0.3 μ m for the fictitious droplets of 30 μ m in diameter, respectively. In addition to the new design of an inkjet monitoring instrument with a scanning mirror, two novel methods to accurately measure the droplet volume by amplifying a minute droplet volume difference and then converting to other physical properties are suggested and the droplet volume difference of ±0.3% is demonstrated to be discernible using numerical simulations, even with the low measurement accuracy of 1 μ m . When the fact is considered that the conventional vision-based method with a CCD camera requires the optical measurement accuracy less than 25 nm to measure the volume of an in-flight droplet in the nominal diameter of 50 μ m at the same volume measurement accuracy, the suggested method with the developed prototype offers a whole new opportunity to inkjet printing for display applications.

  2. FAIR - Facility, Research Program and Status of the Project

    International Nuclear Information System (INIS)

    Majka, Z.

    2011-01-01

    The international Facility for Antiproton and Ion Research (FAIR) in Europe will provide a worldwide science community with a unique and technically innovative accelerator system to perform forefront research in the sciences concerned with the basic structure of matter, and in intersections with other fields. The facility will deliver an extensive range of primary and secondary particle beams from protons and their antimatter partners, antiprotons, to ion beams of all chemical elements up to the heaviest, uranium, with in many respects unique properties and intensities. The paper will include overview of the new facility design and research programs to be carried out there. The current status of the FAIR project will be also presented. (author)

  3. Fluorescence Exclusion: A Simple Method to Assess Projected Surface, Volume and Morphology of Red Blood Cells Stored in Blood Bank

    Directory of Open Access Journals (Sweden)

    Camille Roussel

    2018-05-01

    Full Text Available Red blood cells (RBC ability to circulate is closely related to their surface area-to-volume ratio. A decrease in this ratio induces a decrease in RBC deformability that can lead to their retention and elimination in the spleen. We recently showed that a subpopulation of “small RBC” with reduced projected surface area accumulated upon storage in blood bank concentrates, but data on the volume of these altered RBC are lacking. So far, single cell measurement of RBC volume has remained a challenging task achieved by a few sophisticated methods some being subject to potential artifacts. We aimed to develop a reproducible and ergonomic method to assess simultaneously RBC volume and morphology at the single cell level. We adapted the fluorescence exclusion measurement of volume in nucleated cells to the measurement of RBC volume. This method requires no pre-treatment of the cell and can be performed in physiological or experimental buffer. In addition to RBC volume assessment, brightfield images enabling a precise definition of the morphology and the measurement of projected surface area can be generated simultaneously. We first verified that fluorescence exclusion is precise, reproducible and can quantify volume modifications following morphological changes induced by heating or incubation in non-physiological medium. We then used the method to characterize RBC stored for 42 days in SAG-M in blood bank conditions. Simultaneous determination of the volume, projected surface area and morphology allowed to evaluate the surface area-to-volume ratio of individual RBC upon storage. We observed a similar surface area-to-volume ratio in discocytes (D and echinocytes I (EI, which decreased in EII (7% and EIII (24%, sphero-echinocytes (SE; 41% and spherocytes (S; 47%. If RBC dimensions determine indeed the ability of RBC to cross the spleen, these modifications are expected to induce the rapid splenic entrapment of the most morphologically altered RBC

  4. Status of spallation neutron source program in High Intensity Proton Accelerator Project

    International Nuclear Information System (INIS)

    Oyama, Yukio

    2001-01-01

    Japan Atomic Energy Research Institute and High Energy Accelerator Organization are jointly designing a 1 MW spallation neutron source as one of the research facilities planned in the High Intensity Proton Accelerator Project. The spallation neutron source is driven by 3 GeV proton beam with a mercury target and liquid hydrogen moderators. The present status of design for these spallation source and relevant facility is overviewed. (author)

  5. Present status of spallation target development. JAERI/KEK Joint Project

    International Nuclear Information System (INIS)

    Hino, R.; Kaminaga, M.; Haga, K.

    2001-01-01

    The Japan Atomic Energy Research Institute (JAERI) and the High Energy Accelerator Research Organization (KEK) are promoting a plan to construct a neutron scattering facility under the JAERI/KEK Joint Project. Design and R and D works are being carried out vigorously for realizing the mercury target system consisting of the mercury target, moderators and reflectors working as a spallation neutron source, as well as a remote handling system for exchanging such components which will be highly irradiated. This report introduces an outline of the present status of design and development activities on the spallation target system. (author)

  6. National Status and Trends, Benthic Surveillance Project Sites, 1984-1992, National Centers for Coastal Ocean Science

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set reports information regarding the nominal sampling locations for the National Status and Trends Benthic Surveillance Project sites. One record is...

  7. Status of Radon Related Activities in Member States Participating in Technical Cooperation Projects in Europe

    International Nuclear Information System (INIS)

    2017-03-01

    This publication summarizes the status of radon programmes at the start of 2014 in the Member States in Europe participating in the IAEA technical cooperation project on establishing enhanced approaches to the control of public exposure to radon. The current status was determined from responses to a questionnaire covering the following elements of a national radon action plan: policies and strategies; radon measurement surveys; establishment of reference levels; managing radon in existing buildings and in future buildings; education and training of professionals; and public awareness initiatives.

  8. SiC/SiC fuel cladding R and D Project 'SCARLET': Status and future plan

    International Nuclear Information System (INIS)

    Kishimoto, Hirotatsu; Kohyama, Akira

    2015-01-01

    This paper provides the recent progress in SiC/SiC development towards early utilisation for LWRs based on NITE method. After the March 11 Disaster in East-Japan, ensuring safe technology for LWR became a top priority R and D in nuclear energy policy of Japan. Along this line, replacement of Zircaloy claddings with SiC/SiC based fuel cladding is becoming one of the most attractive options and a MEXT fund based project, SCARLET, and a METI fund based project have been launched as 5-year termed projects at Muroran Institute of Technology. These projects care for NITE process for making long SiC/SiC fuel pins and connecting technology integration. The SCARLET project also includes coolant compatibility and irradiation effect evaluations as LWR and LMFBR materials. The outline and the present status of the SCARLET project will be briefly introduced in the present paper. (authors)

  9. Status of the Fermilab Energy Doubler/Saver project

    Energy Technology Data Exchange (ETDEWEB)

    1977-01-01

    The possibility of building a ring of superconducting magnets was considered very early in the design of the Fermilab main accelerator. It was concluded that the technology of superconducting magnets was not at that time, sufficiently advanced. Therefore, the main ring was designed and built with conventional magnets. However, space was left in the main-ring tunnel for a future ring of superconducting magnets. The Energy Doubler/Saver (ED/S) was initiated in 1972 as a project to build a ring of superconducting magnets with the objective of dramatically increasing the research potential of the Fermilab accelerators. This was to be accomplished at a moderate cost and in such a manner as to make possible a significant saving of electrical energy. A description is given of the evolution of this program as well as give a status report of the Ed/S research and development program.

  10. Status of the Fermilab Energy Doubler/Saver project

    International Nuclear Information System (INIS)

    1977-01-01

    The possibility of building a ring of superconducting magnets was considered very early in the design of the Fermilab main accelerator. It was concluded that the technology of superconducting magnets was not at that time, sufficiently advanced. Therefore, the main ring was designed and built with conventional magnets. However, space was left in the main-ring tunnel for a future ring of superconducting magnets. The Energy Doubler/Saver (ED/S) was initiated in 1972 as a project to build a ring of superconducting magnets with the objective of dramatically increasing the research potential of the Fermilab accelerators. This was to be accomplished at a moderate cost and in such a manner as to make possible a significant saving of electrical energy. A description is given of the evolution of this program as well as give a status report of the Ed/S research and development program

  11. Mining exploitation of Imouraren.Complementary studies.Report of synthesis - volume I. and J. Project realization Economics variants and studies

    International Nuclear Information System (INIS)

    1980-07-01

    The object of volume I is to propose a plan for the Imouraren project realization. The study consists essentially of studies realization, supplies and construction and operator particular activities during investment period.This study : technical activities level to be attained and recommended method for their execution, project realization planning and overall complex investment costs mine, processing plant, utilities and general services, town and infrastructures. The aim of the volume J is to present studies result that have been carried out within three main directions : an essay of several procedure variants for the plant ; a modification of mining exploitation planning to minimize the overburden and obtain an average grade of maximum ore during first years functionment and economical studies in order to economically evaluate the project in many cases by calculating the internal rate of profit for many uranium sell prices and by utilizing as base investment costs and functioning project reference [fr

  12. Status of volcanism studies for the Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Crowe, B.; Perry, F.; Murrell, M.; Poths, J.; Valentine, G.A. [Los Alamos National Lab., NM (United States); Wells, S. [Univ. of California, Riverside, CA (United States); Bowker, L.; Finnegan, K. [Univ. of Nevada, Las Vegas, NV (United States); Geissman, J.; McFadden, L.

    1995-02-01

    Chapter 1 introduces the volcanism issue for the Yucca Mountain site and provides the reader with an overview of the organization, content, and significant conclusions of this report. The risk of future basaltic volcanism is the primary topic of concern including both events that intersect a potential repository and events that occur near or within the waste isolation system of a repository. Chapter 2 describes the volcanic history of the Yucca Mountain region (YMR) and emphasizes the Pliocene and Quaternary volcanic record, the interval of primary concern for volcanic risk assessment. The Lathrop Wells volcanic center is described in detail because it is the youngest basalt center in the YMR. Chapter 3 describes the tectonic setting of the YMR and presents and assesses the significance of multiple alternative tectonic models. Geophysical data are described for the YMR and are used as an aid to understand the distribution of basaltic volcanic centers. Chapter 4 discusses the petrologic and geochemical features of basaltic volcanism in the YMR, the southern Great Basin and the Basin and Range province. The long time of activity and characteristic small volume of the Postcaldera basalt of the YMR result in one of the lowest eruptive rates in a volcanic field in the southwest United States. Chapter 5 summarizes current concepts of the segregation, ascent, and eruption of basalt magma. Chapter 6 summarizes the history of volcanism studies (1979 through early 1994), including work for the Yucca Mountain Site Characterization Project and overview studies by the state of Nevada and the Nuclear Regulatory Commission. Chapter 7 summarizes probabilistic volcanic hazard assessment using a three-part conditional probability model. Chapter 8 describes remaining volcanism work judged to be needed to complete characterization studies for the YMR. Chapter 9 summarizes the conclusions of this volcanism status report.

  13. Status of volcanism studies for the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Crowe, B.; Perry, F.; Murrell, M.; Poths, J.; Valentine, G.A.; Wells, S.; Bowker, L.; Finnegan, K.; Geissman, J.; McFadden, L.

    1995-02-01

    Chapter 1 introduces the volcanism issue for the Yucca Mountain site and provides the reader with an overview of the organization, content, and significant conclusions of this report. The risk of future basaltic volcanism is the primary topic of concern including both events that intersect a potential repository and events that occur near or within the waste isolation system of a repository. Chapter 2 describes the volcanic history of the Yucca Mountain region (YMR) and emphasizes the Pliocene and Quaternary volcanic record, the interval of primary concern for volcanic risk assessment. The Lathrop Wells volcanic center is described in detail because it is the youngest basalt center in the YMR. Chapter 3 describes the tectonic setting of the YMR and presents and assesses the significance of multiple alternative tectonic models. Geophysical data are described for the YMR and are used as an aid to understand the distribution of basaltic volcanic centers. Chapter 4 discusses the petrologic and geochemical features of basaltic volcanism in the YMR, the southern Great Basin and the Basin and Range province. The long time of activity and characteristic small volume of the Postcaldera basalt of the YMR result in one of the lowest eruptive rates in a volcanic field in the southwest United States. Chapter 5 summarizes current concepts of the segregation, ascent, and eruption of basalt magma. Chapter 6 summarizes the history of volcanism studies (1979 through early 1994), including work for the Yucca Mountain Site Characterization Project and overview studies by the state of Nevada and the Nuclear Regulatory Commission. Chapter 7 summarizes probabilistic volcanic hazard assessment using a three-part conditional probability model. Chapter 8 describes remaining volcanism work judged to be needed to complete characterization studies for the YMR. Chapter 9 summarizes the conclusions of this volcanism status report

  14. Socioeconomic Status As a Risk Factor for Unintended Pregnancy in the Contraceptive CHOICE Project.

    Science.gov (United States)

    Iseyemi, Abigail; Zhao, Qiuhong; McNicholas, Colleen; Peipert, Jeffrey F

    2017-09-01

    To evaluate the association of low socioeconomic status as an independent risk factor for unintended pregnancy. We performed a secondary analysis of data from the Contraceptive CHOICE project. Between 2007 and 2011, 9,256 participants were recruited and followed for up to 3 years. The primary outcome of interest was unintended pregnancy; the primary exposure variable was low socioeconomic status, defined as self-report of either receiving public assistance or having difficulty paying for basic necessities. Four contraceptive groups were evaluated: 1) long-acting reversible contraceptive method (hormonal or copper intrauterine device or subdermal implant); 2) depot medroxyprogesterone acetate injection; 3) oral contraceptive pills, a transdermal patch, or a vaginal ring; or 4) other or no method. Confounders were adjusted for in the multivariable Cox proportional hazard model to estimate the effect of socioeconomic status on risk of unintended pregnancy. Participants with low socioeconomic status experienced 515 unintended pregnancies during 14,001 women-years of follow-up (3.68/100 women-years; 95% CI 3.37-4.01) compared with 200 unintended pregnancies during 10,296 women-years (1.94/100 women-years; 95% CI 1.68-2.23) among participants without low socioeconomic status. Women with low socioeconomic status were more likely to have an unintended pregnancy (unadjusted hazard ratio [HR] 1.8, 95% CI 1.5-2.2). After adjusting for age, education level, insurance status, and history of unintended pregnancy, low socioeconomic status was associated with an increased risk of unintended pregnancy (adjusted HR 1.4, 95% CI 1.1-1.7). Despite the removal of cost barriers, low socioeconomic status is associated with a higher incidence of unintended pregnancy.

  15. Compilation of reports of the Advisory Committee on Reactor Safeguards, 1957-1984. Volume 2. Project Reviews G-P

    International Nuclear Information System (INIS)

    1985-04-01

    This six-volume compilation contains over 1000 reports prepared by the Advisory Committee on Reactor Safeguards from September 1957 through December 1984. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and within project name by chronological order. Part 2 categorizes the reports by the most appropriate generic subject area and within subject area by chronological order

  16. CONTAMINATED SOIL VOLUME ESTIMATE TRACKING METHODOLOGY

    International Nuclear Information System (INIS)

    Durham, L.A.; Johnson, R.L.; Rieman, C.; Kenna, T.; Pilon, R.

    2003-01-01

    The U.S. Army Corps of Engineers (USACE) is conducting a cleanup of radiologically contaminated properties under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The largest cost element for most of the FUSRAP sites is the transportation and disposal of contaminated soil. Project managers and engineers need an estimate of the volume of contaminated soil to determine project costs and schedule. Once excavation activities begin and additional remedial action data are collected, the actual quantity of contaminated soil often deviates from the original estimate, resulting in cost and schedule impacts to the project. The project costs and schedule need to be frequently updated by tracking the actual quantities of excavated soil and contaminated soil remaining during the life of a remedial action project. A soil volume estimate tracking methodology was developed to provide a mechanism for project managers and engineers to create better project controls of costs and schedule. For the FUSRAP Linde site, an estimate of the initial volume of in situ soil above the specified cleanup guidelines was calculated on the basis of discrete soil sample data and other relevant data using indicator geostatistical techniques combined with Bayesian analysis. During the remedial action, updated volume estimates of remaining in situ soils requiring excavation were calculated on a periodic basis. In addition to taking into account the volume of soil that had been excavated, the updated volume estimates incorporated both new gamma walkover surveys and discrete sample data collected as part of the remedial action. A civil survey company provided periodic estimates of actual in situ excavated soil volumes. By using the results from the civil survey of actual in situ volumes excavated and the updated estimate of the remaining volume of contaminated soil requiring excavation, the USACE Buffalo District was able to forecast and update project costs and schedule. The soil volume

  17. Data base on dose reduction research projects for nuclear power plants: Volume 3

    Energy Technology Data Exchange (ETDEWEB)

    Khan, T.A.; Baum, J.W.

    1989-05-01

    This is the third volume in a series of reports that provide information on dose-reduction research and health physics technology for nuclear power plants. The information is taken from data base maintained by Brookhaven National Laboratory's ALARA Center for the Nuclear Regulatory Commission. This report presents information on 80 new projects, covering a wide area of activities. Projects on steam generator degradation, decontamination, robotics, improvement in reactor materials, and inspection techniques, among others, are described in the research section. The section on health physics technology includes some simple and very cost-effective projects to reduce radiation exposures. Collective dose data from the United States and other countries are also presented. In the conclusion, we suggest that although new advanced reactor design technology will eventually reduce radiation exposures at nuclear power plants to levels below serious concern, in the interim an aggressive approach to dose reduction remains necessary. 20 refs.

  18. ISTIMES project: status and outcomes

    Science.gov (United States)

    Cuomo, V.; Proto, M.; Soldovieri, F.

    2012-04-01

    ISTIMES is a project approved in the Seventh Framework Programme of the European Union under the Joint Call FP7-ICT-SEC-2007-1. It has a three years duration and will be completed within June 2012. According to the aims of the proposal, ISTIMES project has designed, assessed and developed a prototypical modular and scalable ICT-based system, exploiting distributed and local sensors, for non-destructive electromagnetic monitoring; the specific application field was the reliability and safety of critical transport infrastructures, even if the modularity of the ISTIMES approach has permitted to extend it successfully to other critical infrastructures as dams. The continuous and fruitful involvement of end users (as Italian Civil Protection) allowed to develop applications focused on users needs. ISTIMES couples current monitoring of infrastructures with a high situational awareness during crises management, providing updated and detailed real and near real time information about the infrastructure status to improve decision support for emergency and disasters stakeholders. The system exploits an open network architecture that can accommodate a wide range of heterogeneous sensors, static and mobile, and can be easily scaled up to allow the integration of additional sensors and interfaces with other networks. It relies on state-of-the-art electromagnetic sensors, enabling a networking of terrestrial sensors, supported by specific satellite and airborne measurements. The integration of electromagnetic technologies with new ICT information and telecommunications systems enables remotely controlled monitoring and surveillance at different temporal and spatial scales, providing indexes and images of the critical transport infrastructures. The project has exploited, assessed and improved many different non-invasive technologies based on electromagnetic sensing as: Optic Fiber Sensors, Synthetic Aperture; Radar (SAR) satellite platform; Hyperspectral Spectroscopy; Infrared

  19. Status Review of Wildlife Mitigation at 14 of 27 Major Hydroelectric Projects in Idaho, 1983-1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Robert C.; Mehrhoff, L.A.

    1985-01-01

    The Pacific Northwest Electric Power Planning and Conservation Act and wildlife and their habitats in the Columbia River Basin and to compliance with the Program, the wildlife mitigation status reports coordination with resource agencies and Indian Tribes. developed the Columbia River Basin Fish and Wildlife Program development, operation, and maintenance of hydroelectric projects on existing agreements; and past, current, and proposed wildlife factual review and documentation of existing information on wildlife meet the requirements of Measure 1004(b)(l) of the Program. The mitigation, enhancement, and protection activities were considered. In mitigate for the losses to those resources resulting from the purpose of these wildlife mitigation status reports is to provide a resources at some of the Columbia River Basin hydroelectric projects the river and its tributaries. To accomplish this goal, the Council were written with the cooperation of project operators, and in within Idaho.

  20. Current Status of the LOFAR EoR Key Science Project

    Science.gov (United States)

    Koopmans, L. V. E.; LOFAR EoR KSP Team

    2018-05-01

    A short status update on the LOFAR Epoch of Reionization (EoR) Key Science Project (KSP) is given, regarding data acquisition, data processing and analysis, and current power-spectrum limits on the redshifted 21-cm signal of neutral hydrogen at redshifts z = 8 - 10. With caution, we present a preliminary astrophysical analysis of ~60 hr of processed LOFAR data and their resulting power spectrum, showing that potentially already interesting limits on X-ray heating during the Cosmic Dawn can already be gained. This is by no means the final analysis of this sub-set of data, but illustrates the future potential when all nearly 3000 hr of data in hand on two EoR windows will have been processed.

  1. 94-1 Research and Development Project Lead Laboratory Support. Status report, April 1, 1996--June 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Dinehart, M. [comp.

    1996-10-01

    This document reports status and technical progress for Los Alamos 94-1 Research and Development projects concerned with the management of plutonium and plutonium contaminated materials during the third quarter of FY96.

  2. National Status and Trends, Benthic Surveillance Project Chemistry Data, 1984-1992, National Centers for Coastal Ocean Science

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The National Status and Trends (NS&T) Benthic Surveillance Project Chemistry data file reports the trace concentrations of a suite of chemical contaminants in...

  3. National Status and Trends, Benthic Surveillance Project Chemistry Data, 1984-1992, National Centers for Coastal Ocean Science

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The National Status and Trends (NSandT) Benthic Surveillance Project Chemistry data file reports the trace concentrations of a suite of chemical contaminants in...

  4. Compliance status summaries for federal and state statutory directives that apply to the Salt Repository Project at the Deaf Smith County Site, Texas

    International Nuclear Information System (INIS)

    1986-07-01

    This document contains statutory summaries, checklists of compliance requirements, status summaries, and lists of information needs for the environmental and health and safety statutory directives at Federal and State levels that apply to the Salt Repository Project at the Deaf Smith County Site, Texas. Statutes that apply in general to any repository project but not specifically to the Deaf Smith are not included. The information herein supplements the Salt Repository Project Statutory Compliance Plan and the Salt Repository Project Permitting Management Plan by providing lengthy details on statutory directives, compliance requirements, information needs, and the overall status of the environmental and health and safety compliance program for the Salt Repository Project at the Deaf Smith County Site, Texas

  5. Status of safety issues at licensed power plants: TMI action plan requirements, unresolved safety issues, generic safety issues

    International Nuclear Information System (INIS)

    1991-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, a program was established whereby an annual NUREG report would be published on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was compiled and reported in three NUREG volumes. Volume 1, published in March 1991, addressed the status of of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). This annual NUREG report combines these volumes into a single report and provides updated information as of September 30, 1991. The data contained in these NUREG reports are a product of the NRC's Safety Issues Management System (SIMS) database, which is maintained by the Project Management Staff in the Office of Nuclear Reactor Regulation and by NRC regional personnel. This report is to provide a comprehensive description of the implementation and verification status of TMI Action Plan Requirements, safety issues designated as USIs, and GSIs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. An additional purpose of this NUREG report is to serve as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues up until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  6. User's guide for PRISIM (Plant Risk Status Information Management System) Arkansas Nuclear One--Unit 1: Volume 2, Program for regulators

    Energy Technology Data Exchange (ETDEWEB)

    Campbell, D.J.; Guthrie, V.H.; Kirchner, J.R.; Kirkman, J.Q.; Paula, H.M.; Ellison, B.C.; Dycus, F.M.; Farquharson, J.A.; Flanagan, G.F.

    1988-03-01

    This user's guide is a two-volume document designed to teach NRC inspectors and NRC regulators how to access probabilistic risk assessment information from the two Plant Risk Status Information Management System (PRISIM) programs developed for Arkansas Nuclear One--Unit One (ANA-1). This document, Volume 2, describes how the PRA information available in Version 2.0 of PRISIM is useful as an evaluation tool for regulatory activities. Using PRISIM is useful as an evaluation tool for regulatory activities. Using PRISIM, regulators can both access PRA information and modify the information to assess the impact these changes may have on plant safety. Each volume is a stand-alone document.

  7. The SuperB Project: Status and the Physics Reach

    International Nuclear Information System (INIS)

    Neri, Nicola

    2012-01-01

    The SuperB experiment is a next generation Super Flavour Factory expected to accumulate 75 ab −1 of data at the Υ(4S) in five years of nominal running, and will be built at the recently established Cabibbo Laboratory on the outskirts of Rome. In addition to running data at the Υ(4S), SuperB will be able to accumulate data from the ψ(3770) up to the Υ(6S). A polarized electron beam enables unique physics opportunities at SuperB. The large samples of B, D and τ decays that will be recorded at SuperB can be used to provide both stringent constraints on new physics scenarios, and over-constraints on the Standard Model. We present the status of the project as well as the physics potential of SuperB.

  8. ARPA-E Impacts: A Sampling of Project Outcomes, Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Rohlfing, Eric [Dept. of Energy (DOE), Washington DC (United States). Advanced Research Projects Agency-Energy (ARPA-E)

    2017-02-27

    The Advanced Research Projects Agency-Energy (ARPA-E) is demonstrating that a collaborative model has the power to deliver real value. The Agency’s first compilation booklet of impact sheets, published in 2016, began to tell the story of how ARPA-E has already made an impact in just seven years—funding a diverse and sophisticated research portfolio on advanced energy technologies that enable the United States to tackle our most pressing energy challenges. One year later our research investments continue to pay off, with a number of current and alumni project teams successfully commercializing their technologies and advancing the state of the art in transformative areas of energy science and engineering. There is no single measure that can fully illustrate ARPA-E’s success to date, but several statistics viewed collectively begin to reveal the Agency’s impact. Since 2009, ARPA-E has provided more than $1.5 billion in funding for 36 focused programs and three open funding solicitations, totaling over 580 projects. Of those, 263 are now alumni projects. Many teams have successfully leveraged ARPA-E’s investment: 56 have formed new companies, 68 have partnered with other government agencies to continue their technology development, and 74 teams have together raised more than $1.8 billion in reported funding from the private sector to bring their technologies to market. However, even when viewed together, those measures do not capture ARPA-E’s full impact. To best understand the Agency’s success, the specific scientific and engineering challenges that ARPA-E project teams have overcome must be understood. This booklet provides concrete examples of those successes, ranging from innovations that will bear fruit in the future to ones that are beginning to penetrate the market as products today. Importantly, half of the projects highlighted in this volume stem from OPEN solicitations, which the agency has run in 2009, 2012, and 2015. ARPA-E’s OPEN programs

  9. Status of the R+D programme in the field of the heat carrying and heat transfer components of the PNP project

    International Nuclear Information System (INIS)

    Mausbeck, H.; Jansing, W.

    1984-01-01

    The PNP Project (Project Nuclear Process Heat) is described. It covers the status of research and development in the field of heat exchange and heat exchanger components; concept of plant for coal gasification; description of large scale test facilities and its components; and the time schedule for the project development

  10. Proceedings of the symposium on the joint research project between JAERI and Universities. Status and perspective of the advanced radiation technology project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-06-01

    This report describes the Proceedings of the Symposium on the Joint Research Project between JAERI and Universities -Status and Perspective of the Advanced Radiation Technology Project-, held at Tokyo on January 27, 1999. After a series of conferences which had been held at the second or third year to present the main activities of this unique collaborative project system, the symposium was particularly focused on critical reviewing of the project and on its future. The scientific papers presented were the recent achievements in the themes: 1) nuclear spectroscopy and nuclear materials science with an isotope separator on-line; 2) radiation shielding and nuclear data for use of accelerators; 3) materials analysis methods using ion beams; 4) microstructure in polymer materials irradiated with ions; 5) effects of transmutation products in fusion-reactor materials; 6) physiological study of plants using positron-emitting isotopes. The new theme titled 'Development and application of micro PIXE analysis in the atmospheric pressure' was proposed. Eight panelists discussed the future of the project. The 17 papers are indexed individually. (J.P.N.)

  11. Extending the GANIL control system for the SPIRAL project

    International Nuclear Information System (INIS)

    Lecorche, E.

    1997-01-01

    The SPIRAL project under construction at GANIL aims to deliver radioactive ion beams to the physicists by the end of 1998. In 1996, it has been proposed to achieve most of the SPIRAL control system as an extension of the system currently in use at GANIL. Therefore the main features of the GANIL control system design are first recalled. Then the paper shows how the GANIL control system should have been upgraded and extended to integrate the SPIRAL project. This evolution had to cope with the specific needs brought by the new machine and to consider the size of the project which is around one third of the GANIL control system volume. Lastly current status of the system is given. (author)

  12. Extending the GANIL control system for the SPIRAL project

    Energy Technology Data Exchange (ETDEWEB)

    Lecorche, E

    1997-12-31

    The SPIRAL project under construction at GANIL aims to deliver radioactive ion beams to the physicists by the end of 1998. In 1996, it has been proposed to achieve most of the SPIRAL control system as an extension of the system currently in use at GANIL. Therefore the main features of the GANIL control system design are first recalled. Then the paper shows how the GANIL control system should have been upgraded and extended to integrate the SPIRAL project. This evolution had to cope with the specific needs brought by the new machine and to consider the size of the project which is around one third of the GANIL control system volume. Lastly current status of the system is given. (author) 5 refs.

  13. 76 FR 76153 - Notice of Effectiveness of Exempt Wholesale Generator Status; Caney River Wind Project, LLC...

    Science.gov (United States)

    2011-12-06

    ...] Notice of Effectiveness of Exempt Wholesale Generator Status; Caney River Wind Project, LLC, Mesquite Solar 1, LLC, Copper Crossing Solar LLC, Copper Mountain Solar 1, LLC, Pinnacle Wind, LLC, Bellevue... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EG11-115-000, EG11-116-000...

  14. Data base on dose reduction research projects for nuclear power plants. Volume 5

    Energy Technology Data Exchange (ETDEWEB)

    Khan, T.A.; Yu, C.K.; Roecklein, A.K. [Brookhaven National Lab., Upton, NY (United States)

    1994-05-01

    This is the fifth volume in a series of reports that provide information on dose reduction research and health physics technology or nuclear power plants. The information is taken from two of several databases maintained by Brookhaven National Laboratory`s ALARA Center for the Nuclear Regulatory Commission. The research section of the report covers dose reduction projects that are in the experimental or developmental phase. It includes topics such as steam generator degradation, decontamination, robotics, improvements in reactor materials, and inspection techniques. The section on health physics technology discusses dose reduction efforts that are in place or in the process of being implemented at nuclear power plants. A total of 105 new or updated projects are described. All project abstracts from this report are available to nuclear industry professionals with access to a fax machine through the ACEFAX system or a computer with a modem and the proper communications software through the ACE system. Detailed descriptions of how to access all the databases electronically are in the appendices of the report.

  15. Numerical expression of volume status using the bioimpedance ratio in continuous ambulatory peritoneal dialysis patients: A pilot study

    Directory of Open Access Journals (Sweden)

    Mun Jang

    2017-09-01

    Full Text Available Background: Volume overload results in higher mortality rates in patients on continuous ambulatory peritoneal dialysis (CAPD. The ratio of bioimpedance (RBI might be a helpful parameter in adjusting dry body weight in CAPD patients. This study examined whether it is possible to distinguish between non-hypervolemic status and hypervolemic status in CAPD patients by using only RBI. Methods: RBI was calculated as follows: RBI = impedance at 50 kHz/impedance at 500 kHz. Based on the experts’ judgements, a total of 64 CAPD patients were divided into two groups, a non-hypervolemic group and a hypervolemic group. The RBI was measured from right wrist to right ankle (rw-raRBI by bioimpedance spectroscopy (BCM®, Fresenius Medical Care before and after the peritosol was emptied. Other RBIs were measured from the right side of the anterior superior iliac spine to the ipsilateral ankle (rasis-raRBI to control for the electro-physiological effects of peritoneal dialysate. Results: The mean rw-raRBI of non-hypervolemic patients was higher than that of hypervolemic patients in the presence (1.141 ± 0.022 vs. 1.121 ± 0.021, P < 0.001 of a peritosol. Likewise, the mean rasis-raRBI of non-hypervolemic patients was higher than that of hypervolemic patients (presence of peritosol: 1.136 ± 0.026 vs. 1.109 ± 0.022, P < 0.001; absence of peritosol: 1.131 ± 0.022 vs. 1.107 ± 0.022, P < 0.001. Conclusion: The volume status of CAPD patients was able to be simply expressed by RBI. Therefore, this study suggests that when patients cannot be analyzed using BCM, RBI could be an alternative.

  16. Effect of high and low ultrafiltration volume during hemodialysis on relative blood volume

    NARCIS (Netherlands)

    Dasselaar, JJ; de Jong, PE; Huisman, RM; Franssen, CFM

    2006-01-01

    Achieving an optimal posthemodialysis hydration status may be difficult because objective criteria for dry weight are lacking. Both relative blood volume changes (Delta RBV) at the end of hemodialysis and Delta RBV normalized for ultrafiltration volume (Delta RBV/UF ratio) have been reported to

  17. Resource Conservation and Recovery Act ground-water monitoring projects for Hanford Facilities: Progress report for the period July 1 to September 30, 1989 - Volume 1 - Text

    Energy Technology Data Exchange (ETDEWEB)

    Smith, R.M.; Bates, D.J.; Lundgren, R.E.

    1989-12-01

    This is Volume 1 of a two-volume document that describes the progress of 14 Hanford Site ground-water monitoring projects for the period July 1 to September 30, 1989. This volume discusses the projects; Volume 2 provides as-built diagrams, completion/inspection reports, drilling logs, and geophysical logs for wells drilled, completed, or logged during this period. Volume 2 can be found on microfiche in the back pocket of Volume 1. The work described in this document is conducted by the Pacific Northwest Laboratory under the management of Westinghouse Hanford Company for the US Department of Energy. Concentrations of ground-water constituents are compared to federal drinking water standards throughout this document for reference purposes. All drinking water supplied from the sampled aquifer meets regulatory standards for drinking water quality.

  18. Life sciences payload definition and integration study. Volume 3: Preliminary equipment item specification catalog for the carry-on laboratories. [for Spacelab

    Science.gov (United States)

    1974-01-01

    All general purpose equipment items contained in the final carry-on laboratory (COL) design concepts are described in terms of specific requirements identified for COL use, hardware status, and technical parameters such as weight, volume, power, range, and precision. Estimated costs for each item are given, along with projected development times.

  19. Final report on Phase II remedial action at the former Middlesex Sampling Plant and associated properties. Volume 2

    International Nuclear Information System (INIS)

    1985-04-01

    Volume 2 presents the radiological measurement data taken after remedial action on properties surrounding the former Middlesex Sampling Plant during Phase II of the DOE Middlesex Remedial Action Program. Also included are analyses of the confirmatory radiological survey data for each parcel with respect to the remedial action criteria established by DOE for the Phase II cleanup and a discussion of the final status of each property. Engineering details of this project and a description of the associated health physics and environmental monitoring activities are presented in Volume 1

  20. Pulmonary nodules: sensitivity of maximum intensity projection versus that of volume rendering of 3D multidetector CT data

    NARCIS (Netherlands)

    Peloschek, Philipp; Sailer, Johannes; Weber, Michael; Herold, Christian J.; Prokop, Mathias; Schaefer-Prokop, Cornelia

    2007-01-01

    PURPOSE: To prospectively compare maximum intensity projection (MIP) and volume rendering (VR) of multidetector computed tomographic (CT) data for the detection of small intrapulmonary nodules. MATERIALS AND METHODS: This institutional review board-approved prospective study included 20 oncology

  1. Present status and future directions of the Mayo/IBM PACS project

    Science.gov (United States)

    Morin, Richard L.; Forbes, Glenn S.; Gehring, Dale G.; Salutz, James R.; Pavlicek, William

    1991-07-01

    This joint project began in 1988 and was motivated by the need to develop an alternative to the archival process in place at that time (magnetic tape) for magnetic resonance imaging and neurological computed tomography. In addition, this project was felt to be an important step in gaining the necessary clinical experience for the future implementation of various aspects of electronic imaging. The initial phase of the project was conceived and developed to prove the concept, test the fundamental components, and produce performance measurements for future work. The key functions of this phase centered on attachment of imaging equipment (GE Signa) and archival processes using a non-dedicated (institutionally supplied) local area network (LAN). Attachment of imaging equipment to the LAN was performed using commercially available devices (Ethernet, PS/2, Token Ring). Image data were converted to ACR/NEMA format with retention of the vendor specific header information. Performance measurements were encouraging and led to the design of following projects. The second phase has recently been concluded. The major features of this phase have been to greatly expand the network, put the network into clinical use, establish an efficient and useful viewing station, include diagnostic reports in the archive data, provide wide area network (WAN) capability via ISDN, and establish two-way real-time video between remote sites. This phase has heightened both departmental and institutional thought regarding various issues raised by electronic imaging. Much discussion regarding both present as well as future archival processes has occurred. The use of institutional LAN resources has proven to be adequate for the archival function examined thus far. Experiments to date have shown that use of dedicated resources will be necessary for retrieval activities at even a basic level. This report presents an overview of the background present status and future directions of the project.

  2. Issues related to uncertainty in projections of hazardous and mixed waste volumes in the U.S. Department of Energy's environmental restoration program

    International Nuclear Information System (INIS)

    Picel, K.C.

    1995-01-01

    Projected volumes of contaminated media and debris at US Department of Energy (DOE) environmental restoration sites that are potentially subject to the hazardous waste provisions of the Resource Conservation and Recovery Act are needed to support programmatic planning. Such projections have been gathered in various surveys conducted under DOE's environmental restoration and waste management programs. It is expected that reducing uncertainty in the projections through review of existing site data and process knowledge and through further site characterization will result in substantially lowered projections. If promulgated, the US Environmental Protection Agency's Hazardous Waste Identification Rule would result in potentially even greater reductions in the projections when site conditions are reviewed under the provisions of the new rule. Reducing uncertainty in projections under current and future waste identification rules may be necessary to support effective remediation planning. Further characterization efforts that may be conducted should be designed to limit uncertainty in identifying volumes of wastes to the extent needed to support alternative selection and to minimize costs of remediation

  3. Final Status Survey for the Largest Decommissioning Project on Earth

    International Nuclear Information System (INIS)

    Dubiel, R.W.; Miller, J.; Quayle, D.

    2006-01-01

    To assist the United States Department of Energy's (US DOE's) re-industrialization efforts at its gaseous diffusion site in Oak Ridge, Tennessee, known as the East Tennessee Technology Park (ETTP), the US DOE awarded a 6-year Decontamination and Decommissioning (D and D) contract to BNG America (formerly BNFL Inc.) in 1997. The ETTP 3-Building D and D Project included the removal and disposition of the materials and equipment from the K-33, K-31, and K-29 Gaseous Diffusion Plant buildings. The three buildings comprise more than 4.8 million square feet (446,000 square meters) of floor surface area and more than 350 million pounds (148 million kilograms) of hazardous and radioactively contaminated material, making it the largest nuclear D and D project in progress anywhere in the world. The logistical hurdles involved in a project of this scope and magnitude required an extensive amount of Engineering and Health Physics professionals. In order to accomplish the Final Status Survey (FSS) for a project of this scope, the speed and efficiency of automated survey equipment was essential. Surveys of floors, structural steel and ceilings up to 60 feet (18 meters) were required. The FSS had to be expanded to include additional remediation and surveys due to characterization surveys and assumptions regarding the nature and extent of contamination provided by the US DOE. Survey design and technical bases had to consider highly variable constituents; including uranium from depleted to low enrichment, variable levels of Technetium-99 and transuranic nuclides, which were introduced into the cascade during the 1960's when recycled uranium (RU) from Savannah River was re-enriched at the facility. The RU was transported to unexpected locations from leaks in the cascade by complex building ventilation patterns. The primary survey tool used for the post remediation and FSS was the Surface Contamination Monitor (SCM) and the associated Survey Information Management System (SIMS

  4. 2D-3D Registration of CT Vertebra Volume to Fluoroscopy Projection: A Calibration Model Assessment

    Directory of Open Access Journals (Sweden)

    P. Bifulco

    2010-01-01

    Full Text Available This study extends a previous research concerning intervertebral motion registration by means of 2D dynamic fluoroscopy to obtain a more comprehensive 3D description of vertebral kinematics. The problem of estimating the 3D rigid pose of a CT volume of a vertebra from its 2D X-ray fluoroscopy projection is addressed. 2D-3D registration is obtained maximising a measure of similarity between Digitally Reconstructed Radiographs (obtained from the CT volume and real fluoroscopic projection. X-ray energy correction was performed. To assess the method a calibration model was realised a sheep dry vertebra was rigidly fixed to a frame of reference including metallic markers. Accurate measurement of 3D orientation was obtained via single-camera calibration of the markers and held as true 3D vertebra position; then, vertebra 3D pose was estimated and results compared. Error analysis revealed accuracy of the order of 0.1 degree for the rotation angles of about 1 mm for displacements parallel to the fluoroscopic plane, and of order of 10 mm for the orthogonal displacement.

  5. STATUS OF MECHANICAL SLUDGE REMOVAL AND COOLING COILS CLOSURE AT THE SAVANNAH RIVER SITE - F TANK FARM CLOSURE PROJECT - 9225

    Energy Technology Data Exchange (ETDEWEB)

    Jolly, R

    2009-01-06

    The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal using the Waste on Wheels (WOW) system within two of its storage tanks. The Waste on Wheels (WOW) system is designed to be relatively mobile with the ability for many components to be redeployed to multiple tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2839 cubic meters (750,000 gallons) each. In addition, Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. DOE intends to remove from service and operationally close Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. After obtaining regulatory approval, the tanks and cooling coils will be isolated and filled with grout for long term stabilization. Mechanical Sludge Removal of the remaining sludge waste within Tank 6 removed {approx} 75% of the original 25,000 gallons in August 2007. Utilizing lessons learned from Tank 6, Tank 5 Mechanical Sludge Removal completed removal of {approx} 90% of the original 125 cubic meters (33,000 gallons) of sludge material in May 2008. The successful removal of sludge material meets the requirement of approximately 19 to 28 cubic meters (5,000 to 7,500 gallons) remaining prior to the Chemical Cleaning process. The Chemical Cleaning Process will utilize 8 wt% oxalic acid to dissolve the remaining sludge heel. The flow sheet for Chemical Cleaning planned a 20:1 volume ratio of acid to sludge for the first strike with mixing provided by the submersible mixer pumps. The subsequent strikes will utilize a 13:1 volume ratio of acid to sludge with no mixing. The results of the Chemical Cleaning Process are detailed in the 'Status

  6. Acid Pit Stabilization Project (Volume 1 - Cold Testing) and (Volume 2 - Hot Testing)

    International Nuclear Information System (INIS)

    Loomis, G. G.; Zdinak, A. P.; Ewanic, M. A.; Jessmore, J. J.

    1998-01-01

    During the summer and fall of Fiscal Year 1997, a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Treatability Study was performed at the Idaho National Engineering and Environmental Laboratory. The study involved subsurface stabilization of a mixed waste contaminated soil site called the Acid Pit. This study represents the culmination of a successful technology development effort that spanned Fiscal Years 1994-1996. Research and development of the in situ grout stabilization technique was conducted. Hardware and implementation techniques are currently documented in a patent pending with the United States Patent and Trademark Office. The stabilization technique involved using jet grouting of an innovative grouting material to form a monolith out of the contamination zone. The monolith simultaneously provides a barrier to further contaminant migration and closes voids in the soil structure against further subsidence. This is accomplished by chemical incorporation of contaminants into less soluble species and achieving a general reduction in hydraulic conductivity within the monolith. The grout used for this study was TECT-HG, a relatively dense iron oxide-based cementitious grout. The treatability study involved cold testing followed by in situ stabilization of the Acid Pit. Volume 1 of this report discusses cold testing, performed as part of a ''Management Readiness Assessment'' in preparation for going hot. Volume 2 discusses the results of the hot Acid Pit Stabilization phase of this project. Drilling equipment was specifically rigged to reduce the spread of contamination, and all grouting was performed under a concrete block containing void space to absorb any grout returns. Data evaluation included examination of implementability of the grouting process and an evaluation of the contaminant spread during grouting. Following curing of the stabilized pit, cores were obtained and evaluated for toxicity characteristic leach ing

  7. GENII: The Hanford Environmental Radiation Dosimetry Software System: Volume 2, Users' manual: Hanford Environmental Dosimetry Upgrade Project

    International Nuclear Information System (INIS)

    Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

    1988-11-01

    The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). The purpose of this coupled system of computer codes is to analyze environmental contamination of, air, water, or soil. This is accomplished by calculating radiation doses to individuals or populations. GENII is described in three volumes of documentation. This second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. The first volume describes the theoretical considerations of the system. The third volume is a Code Maintenance Manual for the user who requires knowledge of code detail. It includes logic diagrams, global dictionary, worksheets, example hand calculations, and listings of the code and its associated data libraries. 27 refs., 17 figs., 23 tabs

  8. Characterization of low-level waste from the industrial sector, and near-term projection of waste volumes and types

    International Nuclear Information System (INIS)

    MacKenzie, D.R.

    1988-01-01

    A telephone survey of low-level waste generators has been carried out in order to make useful estimates of the volume and nature of the waste which the generators will be shipping for disposal when the compacts and states begin operating new disposal facilities. Emphasis of the survey was on the industrial sector, since there has been little information available on characteristics of industrial LLW. Ten large industrial generators shipping to Richland, ten shipping to Barnwell, and two whose wastes had previously been characterized by BNL were contacted. The waste volume shipped by these generators accounted for about two-thirds to three-quarters of the total industrial volume. Results are given in terms of the categories of LLW represented and of the chemical characteristics of the different wastes. Estimates by the respondents of their near-term waste volume projections are presented

  9. Characterization of low-level waste from the industrial sector, and near-term projection of waste volumes and types

    International Nuclear Information System (INIS)

    MacKenzie, D.R.

    1988-01-01

    A telephone survey of low-level waste generators has been carried out in order to make useful estimates of the volume and nature of the waste which the generators are shipping for disposal when the compacts and states begin operating new disposal facilities. Emphasis of the survey was on the industrial sector, since there has been little information available on characteristics of industrial LLW. Ten large industrial generators shipping to Richland, ten shipping to Barnwell, and two whose wastes had previously been characterized by BNL were contacted. The waste volume shipped by these generators accounted for about two-thirds to three-quarters of the total industrial volume. Results are given in terms of the categories of LLW represented and of the chemical characteristics of the different wastes. Estimates by the respondents of their near-term waste volume projections are presented

  10. Current status and perspective of advanced loop type fast reactor in fast reactor cycle technology development project

    International Nuclear Information System (INIS)

    Niwa, Hajime; Aoto, Kazumi; Morishita, Masaki

    2007-01-01

    After selecting the combination of the sodium-cooled fast reactor (SFR) with oxide fuel, the advanced aqueous reprocessing and the simplified pelletizing fuel fabrication as the most promising concept of FR cycle system, 'Feasibility Study on Commercialized Fast Reactor Cycle Systems' was finalized in 2006. Instead, a new project, Fast Reactor Cycle Technology Development Project (FaCT Project) was launched in Japan focusing on development of the selected concepts. This paper describes the current status and perspective of the advanced loop type SFR system in the FaCT Project, especially on the design requirements, current design as well as the related innovative technologies together with the development road-map. Some considerations on advantages of the advanced loop type design are also described. (authors)

  11. Status of initial phase of site-specific seismic monitoring: Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    Rohay, A.C.

    1981-01-01

    This report presents the status of the initial phase of site-specific seismic monitoring work conducted under the Basalt Waste Isolation Project. This work is currently organized under two main elements: (1) a portable array; and (2) a baseline data collection array. Progress toward the development of each array is discussed along with an interpretation of preliminary data obtained from the test of a borehole seismometer at potential repository depths. The text is supplemented by nine figures and one table. 9 figs., 1 tab

  12. Data management for the Clinch River Breeder Reactor Plant Project by use of document status and hold systems

    International Nuclear Information System (INIS)

    Hunt, C.S.; Beck, A.E.; Akhtar, M.S.

    1982-01-01

    This paper describes the development, framework, and scope of the Document Status System and the Document Hold System for the Clinch River Breeder Reactor Plant Project. It shows how data are generated at five locations and transmitted to a central computer for processing and storage. The resulting computerized data bank provides reports needed to perform day-to-day management and engineering planning. Those reports also partially satisfy the requirements of the Project's Quality Assurance Program

  13. Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly project status report, October 1, 1993--December 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    This quarterly project status report discusses research projects being conducted on hazardous materials in aquatic environments of the Mississippi River basin. We continued to seek improvement in our methods of communication and interactions to support the inter-disciplinary, inter-university collaborators within this program. In addition to the defined collaborative research teams, there is increasing interaction among investigators across projects. Planning for the second year of the project has included the development of our internal request for proposals, and refining the review process for selection of proposals for funding.

  14. Surfaced-based investigations plan, Volume 4: Yucca Mountain Project

    International Nuclear Information System (INIS)

    1988-12-01

    This document represents a detailed summary of design plans for surface-based investigations to be conducted for site characterization of the Yucca Mountain site. These plans are current as of December 1988. The description of surface-based site characterization activities contained in this document is intended to give all interested parties an understanding of the current plans for site characterization of Yucca Mountain. The maps presented in Volume 4 are products of the Geographic Information System (GIS) being used by the Yucca Mountain Project. The ARC/INFO GIS software, developed by Environmental Systems Research Institute, was used to digitize and process these SBIP maps. The maps were prepared using existing US Geological Survey (USGS) maps as a planimetric base. Roads and other surface features were interpreted from a variety of sources and entered into the GIS. Sources include the USGS maps, 1976 USGS orthophotoquads and aerial photography, 1986 and 1987 aerial photography, surveyed coordinates of field sites, and a combination of various maps, figures, descriptions and approximate coordinates of proposed locations for future activities

  15. Operational waste volume projection. Revision 20

    International Nuclear Information System (INIS)

    Koreski, G.M.; Strode, J.N.

    1994-01-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of July 1994

  16. Technology status in support of refined technical baseline for the Spent Nuclear Fuel project. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Puigh, R.J.; Toffer, H.; Heard, F.J.; Irvin, J.J.; Cooper, T.D.

    1995-10-20

    The Spent Nuclear Fuel Project (SNFP) has undertaken technology acquisition activities focused on supporting the technical basis for the removal of the N Reactor fuel from the K Basins to an interim storage facility. The purpose of these technology acquisition activities has been to identify technology issues impacting design or safety approval, to establish the strategy for obtaining the necessary information through either existing project activities, or the assignment of new work. A set of specific path options has been identified for each major action proposed for placing the N Reactor fuel into a ``stabilized`` form for interim storage as part of this refined technical basis. This report summarizes the status of technology information acquisition as it relates to key decisions impacting the selection of specific path options. The following specific categories were chosen to characterize and partition the technology information status: hydride issues and ignition, corrosion, hydrogen generation, drying and conditioning, thermal performance, criticality and materials accountability, canister/fuel particulate behavior, and MCO integrity. This report represents a preliminary assessment of the technology information supporting the SNFP. As our understanding of the N Reactor fuel performance develops the technology information supporting the SNFP will be updated and documented in later revisions to this report. Revision 1 represents the incorporation of peer review comments into the original document. The substantive evolution in our understanding of the technical status for the SNFP (except section 3) since July 1995 have not been incorporated into this revision.

  17. Technology status in support of refined technical baseline for the Spent Nuclear Fuel project. Revision 1

    International Nuclear Information System (INIS)

    Puigh, R.J.; Toffer, H.; Heard, F.J.; Irvin, J.J.; Cooper, T.D.

    1995-01-01

    The Spent Nuclear Fuel Project (SNFP) has undertaken technology acquisition activities focused on supporting the technical basis for the removal of the N Reactor fuel from the K Basins to an interim storage facility. The purpose of these technology acquisition activities has been to identify technology issues impacting design or safety approval, to establish the strategy for obtaining the necessary information through either existing project activities, or the assignment of new work. A set of specific path options has been identified for each major action proposed for placing the N Reactor fuel into a ''stabilized'' form for interim storage as part of this refined technical basis. This report summarizes the status of technology information acquisition as it relates to key decisions impacting the selection of specific path options. The following specific categories were chosen to characterize and partition the technology information status: hydride issues and ignition, corrosion, hydrogen generation, drying and conditioning, thermal performance, criticality and materials accountability, canister/fuel particulate behavior, and MCO integrity. This report represents a preliminary assessment of the technology information supporting the SNFP. As our understanding of the N Reactor fuel performance develops the technology information supporting the SNFP will be updated and documented in later revisions to this report. Revision 1 represents the incorporation of peer review comments into the original document. The substantive evolution in our understanding of the technical status for the SNFP (except section 3) since July 1995 have not been incorporated into this revision

  18. ASEAN-USAID buildings energy conservation project. Volume 1, Energy standards: Final report

    Energy Technology Data Exchange (ETDEWEB)

    Levine, M.D.; Busch, J.F. [eds.][Lawrence Berkeley Lab., CA (United States); Deringer, J.J. [Deringer Group, Riva, MD (United States)

    1992-06-01

    Mandatory or voluntary energy-efficiency standards for new or existing buildings can play an important role in a national program aimed at promoting energy conservation. Building codes and standards can provide a degree of control over design and building practices throughout the construction process, and encourage awareness of energy-conscious design. Studies in developed countries indicate that efficiency standards can produce energy reductions on the order of 20 to 40% or more. Within ASEAN, analyses of the savings potential from the proposed standards suggest that if implemented, these standards would produce savings over current new design practice of 19% to 24%. In this volume we provide an overview of the ASEAN-USAID project aimed at promulgating standards for energy efficiency in commercial buildings. The process of developing and implementing energy-efficiency standards for buildings can be subdivided into two key components: policy development; and technical and economic analysis. Each of these involves a number of steps and processes, as outlined in Figure 1-1. This volume describes the technical and economic analyses used to develop the proposed energy efficiency standards for four countries (Malaysia, Thailand, the Philippines, and Indonesia), and to refine an energy standard existing in Singapore since 1979. Though oriented toward the ASEAN region, the analysis methods described here are applicable in a range of settings, provided appropriate modifications are made for local building construction, climatic, economic, and political conditions. Implementation issues are not specifically addressed here; rather this volume is oriented towards the analytical work needed to establish or revise an energy standard for buildings.

  19. Status of the tandem FEL project development in Israel

    International Nuclear Information System (INIS)

    Benzvi, I.; Sokolowski, J.; Jerby, E.; Chomski, D.; Ruschin, S.

    1989-01-01

    The authors report the status of a collaborative research project development aimed toward construction of an IR FEL based on the EN tandem electrostatic accelerator of the Weizmann Institute of Science. A preliminary feasibility demonstration project yielded encouraging progress in three aspects: (1) Electron gun and accelerator conversion: A 50-kV 1-A electron gun injector was designed, built, tested, and assembled on the 6-MeV tandem accelerator which was previously converted and conditioned to operate as an electron accelerator in a positively charged HV terminal configuration. Contrary to the configuration of the only electrostatic accelerator FEL demonstrated so far, the electron gun and multistage depressed collector are connected to the ground, and the wiggler is placed in the HV terminal of the straight geometry tandem accelerator. This configuration promises to provide a high current high quality e-beam. (2) Electron-beam transport: The first installation of the electron optical beam recovery system yielded transport efficiency of 80%. Substantial improvement is expected with planned electron optics modifications. An effect, highly significant for realizing long pulse (quasi-cw) FEL operation, was observed experimentally. Due to the damping effect of the accelerator column capacitance network, the voltage terminal stayed constant for milliseconds even with poor beam transport efficiency. This points to the possibility of developing a long pulse FEL which may operate at a single longitudinal mode. (3) Wiggler development: A conventional 4.4-cm period SmCo planar wiggler was acquired and evaluated using a recently constructed floating wire magnetic field measurement setup

  20. Technical support for GEIS: radioactive waste isolation in geologic formations. Volume 2. Commercial waste forms, packaging and projections for preconceptual repository design studies

    International Nuclear Information System (INIS)

    1978-04-01

    This volume, Y/OWI/TM-36/2, ''Commercial Waste Forms, Packaging and Projections for Preconceptual Repository Design Studies,'' is one of a 23-volume series, ''Technical Support for GEIS: Radioactive Waste Isolation in Geologic Formations,'' Y/OWI/TM-36, which supplements the ''Contribution to Draft Generic Environmental Impact Statement on Commercial Waste Management: Radioactive Waste Isolation in Geologic Formations,'' Y/OWI/TM-44. The series provides a more complete technical basis for the preconceptual designs, resource requirements, and environmental source terms associated with isolating commercial LWR wastes in underground repositories in salt, granite, shale and basalt. Wastes are considered from three fuel cycles: uranium and plutonium recycling, no recycling of spent fuel and uranium-only recycling. This volume contains the data base for waste forms, packages, and projections from the commercial waste defined by the Office of Waste Isolation in ''Nuclear Waste Projections and Source Term Data for FY 1977,'' Y/OWI/TM-34. Also, as an alternative data base for repository design and analysis, waste forms, packages, and projections for commercial waste defined by Battelle Pacific Northwest Laboratory (BPNL) have been included. This data base consists of a reference case for use in the alternative design study and a definition of combustible wastes for use in mine fire and hydrogen generation analyses

  1. Capital Improvement Program (CIP) Project Status

    Data.gov (United States)

    Montgomery County of Maryland — This dataset includes pertinent information relating to a capital project’s status administered by the Department of Transportation and the Department of General...

  2. Decontamination and decommissioning project status of the TRIGA mark-2±3 research reactors

    International Nuclear Information System (INIS)

    Jung, K. J.; Baek, S. T.; Jung, W. S.; Park, S. K.; Jung, K. H.

    1999-01-01

    TRIGA Mark-II, the first research reactor in Korea, has operated since 1962, and the second one, TRIGA Mark-III since 1972. Both of them had their operation phased out in 1995 due to their lives and operation of the new research reactor, HANARO at the Korea Atomic Energy Research Institute (KAERI) in Taejeon. Decontamination and decommissioning (D and D) project of the TRIGA Mark-II and Mark-III was started in January 1997 and will be completed in December 2002. In the first year of the project, work was performed in preparation of the decommissioning plan, start of the environmental impact assessment and setup licensing procedure and documentation for the project with cooperation of Korea Institute of Nuclear Safety (KINS). In 1998, Hyundai Engineering Company (HEC) is the main contractor to do design and licensing documentation for the D and D of both reactors. British Nuclear Fuels plc (BNFL) is technical assisting partner of HEC. The decommissioning plan document was submitted to the Ministry of Science and Technology (MOST) for the decommissioning license in December 1998, and it expecting to be issued a license at the end of September 1999. The goal of this project is to release the reactor site and buildings as an unrestricted area. This paper summarizes current status and future plan for the D and D project

  3. Decontamination and decommissioning project status of the TRIGA Mark II and III in Korea

    International Nuclear Information System (INIS)

    Paik, S.T.; Park, S.K.; Chung, K.W.; Chung, U.S.; Jung, K.J.

    1999-01-01

    TRIGA Mark-II, the first research reactor in Korea, has operated since 1962, and the second one, TRIGA Mark-III since 1972. Both of them had their operation phased out in 1995 due to their lives and operation of the new research reactor, HANARO (High-flux Advanced Neutron Application Reactor) at the Korea Atomic Energy Institute (KAERI) in Taejon. Decontamination and decommissioning (D and D) project of TRIGA Mark-II and Mark-III was started in January 1997 and will be completed in December 2002. The first year of the project, work was performed in preparation of the decommissioning plan, start of the environmental impact assessment and setup licensing procedure and documentation for the project with cooperation of Korea Institute of Nuclear Safety (KINS). Hyundai Engineering Company (HEC) is the main contractor to do design and licensing documentation for the D and D of both reactors. British Nuclear Fuels plc (BNFL) is the technical assisting partner of HEC. The decommissioning plan document was submitted to the Ministry of Since and Technology (MOST) for the decommissioning license in December 1998, and it expecting to be issued a license in mid 1999. The goal of this project is to release the reactor site and buildings as an unrestricted area. This paper summarizes current status and future plan for the D and D project. (author)

  4. Project studies

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2018-01-01

    Project organising is a growing field of scholarly inquiry and management practice. In recent years, two important developments have influenced this field: (1) the study and practice of projects have extended their level of analysis from mainly focussing on individual projects to focussing on micro......, and of the explanations of project practices they could offer. To discuss avenues for future research on projects and project practice, this paper suggests the notion of project studies to better grasp the status of our field. We combine these two sets of ideas to analyse the status and future options for advancing...... project research: (1) levels of analysis; and (2) type of research. Analysing recent developments within project studies, we observe the emergence of what we refer to as type 3 research, which reconciles the need for theoretical development and engagement with practice. Type 3 research suggests pragmatic...

  5. The ICARUS project. An underground observatory for astro-particle physics

    International Nuclear Information System (INIS)

    Ereditato, A.

    2004-01-01

    The ICARUS project aims at the realization of a large-mass, high-sensitivity observatory at the Gran Sasso underground Laboratory for the observation of rare astro-particle reactions, such as the interaction of astrophysical and accelerator neutrinos, and the nucleon decay. The detection technique exploits large-volume Time Projection Chambers filled with liquid Argon (LAr TPC). The general principles of this technique are briefly recalled, together with the milestones in the establishment of the present status. The main focus is given to the realization and tests of the first large-mass (600 ton) detector module, built with fully industrial methods, suitable to be cloned in order to reach the final detector mass of about 3000 ton by 2006. (author)

  6. The Ongkharak Nuclear Research Center (ONRC) research reactor project: a status review

    International Nuclear Information System (INIS)

    Rusch, R.; Jacobi, A. Jr.; Yamkate, P.

    2001-01-01

    The new Ongkharak Nuclear Research Center in the vicinity of Bangkok, Thailand is planned to replace the more than 30 years old facilities located in the Chatuchak district, Bangkok. An international team led by general atomics (GA) is designing and constructing the new research complex. It comprises a 10 MW TRIGA type reactor, an isotope production and a centralized waste processing and storage facility. Electrowatt-Ekono Ltd. was hired by the Thai Government Agency, the Office of Atomic Energy for Peace (OAEP), as a consultant to the project. As the project is now approaching the end of its 4 th year, it now stands at a decisive turning point. Basic design is nearly completed and detailed design is well advanced. The turnkey part of the contract including the reactor island, the isotope and waste facilities are still awaiting the issuance of the Construction Permit. Significant progress has been made on the other part of the project, which includes all the supporting infrastructure facilities. The Preliminary Safety Analysis Report (PSAR), prepared by GA, has been reviewed by various parties, including by nuclear safety experts from the IAEA, which has provided continuous support to the OAEP. Experts from the Argonne National Laboratory have been involved in the reviews as well. The PSAR is now under consideration at the Nuclear Facility Safety Sub-Committee (NFSS) of the Thai Atomic Energy for Peace Commission for issuing the Construction Permit of the ONRC Research Reactor. The following paper gives an overview of the project and its present status, outlining the features of the planned facilities and the issues the project is presently struggling with. Major lessons of the past 4 years are highlighted and an outlook into the future is attempted. (orig.)

  7. When treating prostate cancer with three-dimensional conformal radiation therapy the impact of bladder filling status on the volume and integral dose distribution of the target and critical organs should be kept in mind

    International Nuclear Information System (INIS)

    Liu Yueping; Liu Xinfan; Li Yexiong; Guang Ying

    2007-01-01

    Objective: In prostate cancer treated with three-dimensional conformal radiation therapy (3DCRT), we tried to prospectively assess the impact of the filling status of bladder on the volume and the integral dose distribution to the target and surrounding critical organs. Methods: Ten patients with stage T1-T2N0M0 prostate cancer were studied. All patients received 3DCRT to the prostate and inferior seminal vesicle. One hour before CT simulation, the bladder was first voided, and then 400 ml of oral contrast solution was given at every half hour before the CT scan. Urethral catheterization was used for voiding or distending the bladder. When distending the bladder, 250-300 ml of contrast was injected into the bladder with the patient fixed at the supine position. Two sets of transverse images were taken for the whole pelvis in empty and full bladder. After the target and critical organs (bladder, rectum, pelvic small bowel, and femoral heads) were contoured, a treatment plan of three-dimensional conformal radiotherapy was made using the CMS Focus-Xio treatment planning system. The volume and mean doses of CTV, PTV, rectum, bladder, femoral heads, and small bowel with the bladder empty and full were evaluated. The percentage of volume which received 50 Gy in the rectum and bladder, 30 Gy in the femoral heads, and the maximal dose to the pelvic small bowel were also assessed . The variability of volume and dose distribution in these targets or organs was compared between the empty and full bladder status. Results: Comparing to the bladder empty status, full bladder led to a mean increase of 499% in the bladder volume, (67±9) ml and (336±48) ml (P=0.000), respectively. No volume change was found in the CTV, PTV, rectum, femoral heads and pel- vic small bowel(P=0.153,0.501,0.929,0.771,0.081). The mean dose to the bladder in full status was only 35% of that in empty status, (1501±201 ) cGy and (4267±216) cGy(P =0.000), respectively. The mean dose to the pelvic small

  8. Soil-plant water status and wine quality: the case study of Aglianico wine (the ZOViSA project)

    Science.gov (United States)

    Bonfante, Antonello; Manna, Piero; Albrizio, Rossella; Basile, Angelo; Agrillo, Antonietta; De Mascellis, Roberto; Caputo, Pellegrina; Delle Cave, Aniello; Gambuti, Angelita; Giorio, Pasquale; Guida, Gianpiero; Minieri, Luciana; Moio, Luigi; Orefice, Nadia; Terribile, Fabio

    2014-05-01

    The terroir analysis, aiming to achieve a better use of environmental features with respect to plant requirement and wine production, needs to be strongly rooted on hydropedology. In fact, the relations between wine quality and soil moisture regime during the cropping season is well established. The ZOViSA Project (Viticultural zoning at farm scale) tests a new physically oriented approach to terroir analysis based on the relations between the soil-plant water status and wine quality. The project is conducted in southern Italy in the farm Quintodecimo of Mirabella Eclano (AV) located in the Campania region, devoted to quality Aglianico red wine production (DOC). The soil spatial distribution of study area (about 3 ha) was recognized by classical soil survey and geophysics scan by EM38DD; then the soil-plant water status was monitored for three years in two experimental plots from two different soils (Cambisol and Calcisol). Daily climate variables (temperature, solar radiation, rainfall, wind), daily soil water variables (through TDR probes and tensiometers), crop development (biometric and physiological parameters), and grape must and wine quality were monitored. The agro-hydrological model SWAP was calibrated and applied in the two experimental plots to estimate soil-plant water status in different crop phenological stages. The effects of crop water status on crop response and wine quality was evaluated in two different pedo-systems, comparing the crop water stress index with both: crop physiological measurements (leaf gas exchange, leaf water potential, chlorophyll content, LAI measurement), grape bunches measurements (berry weight, sugar content, titratable acidity, etc.) and wine quality (aromatic response). Finally a "spatial application" of the model was carried out and different terroirs defined.

  9. Report on the behalf of the special commission for the examination of the bill project, after activation of the accelerated procedure, related to energy transition for a green growth (nr 2188) - Nr 2230. Volume I, Volume II - comparative table, Volume III - hearings, impact study

    International Nuclear Information System (INIS)

    Bareigts, Ericka; Battistel, Marie-Noelle; Buis, Sabine; Baupin, Denis; Plisson, Philippe

    2014-01-01

    The first volume of this huge report reports the general discussion and the detailed examination, discussion and modifications of the French bill project on energy transition. The addressed topics are: the definition of common objectives for a successful energy transition, for a strengthening of France energy independence and for the struggle against global warming; a better renovation of buildings to save energy, to reduce prices and to create jobs; the development of clean transports to improve air quality and to protect health; the struggle against wastage and the promotion of circular economy from product design to product recycling; the promotion of renewable energies to diversify our energies and valorise territorial resources; the strengthening of nuclear safety and citizen information; the simplification and clarification of procedures for efficiency and competitiveness gains; the empowerment of citizen, enterprises, territories and State to act together. The second volume proposes a table which gives a comparative overview between the bill project text and the text modified and adopted by the commission. The third volume reports hearings of the minister and of several representatives of professional, public, and consumer organisations and bodies. It also contains the report of an impact study performed on all the different arrangements and measures contained by the bill project

  10. Fluid Volume Expansion and Depletion in Hemodialysis Patients Lack Association with Clinical Parameters

    Directory of Open Access Journals (Sweden)

    Sylvia Kalainy

    2015-12-01

    Full Text Available Background: Achievement of normal volume status is crucial in hemodialysis (HD, since both volume expansion and volume contraction have been associated with adverse outcome and events. Objectives: The objectives of this study are to assess the prevalence of fluid volume expansion and depletion and to identify the best clinical parameter or set of parameters that can predict fluid volume expansion in HD patients. Design: This study is cross-sectional. Setting: This study was conducted in three hemodialysis units. Patients: In this study, there are 194 HD patients. Methods: Volume status was assessed by multifrequency bio-impedance spectroscopy (The Body Composition Monitor, Fresenius prior to the mid-week HD session. Results: Of all patients, 48 % ( n = 94 were volume-expanded and 9 % of patients were volume-depleted ( n = 17. Interdialytic weight gain was not different between hypovolemic, normovolemic, and hypervolemic patients. Fifty percent of the volume-expanded patients were hypertensive. Paradoxical hypertension was very common (31 % of all patients; its incidence was not different between patient groups. Intradialytic hypotension was relatively common and was more frequent among hypovolemic patients. Multivariate regression analysis identified only four predictors for volume expansion (edema, lower BMI, higher SBP, and smoking. None of these parameters displayed both a good sensitivity and specificity. Limitations: The volume assessment was performed once. Conclusions: The study indicates that volume expansion is highly prevalent in HD population and could not be identified using clinical parameters alone. No clinical parameters were identified that could reliably predict volume status. This study shows that bio-impedance can assist to determine volume status. Volume status, in turn, is not related to intradialytic weight gain and is unable to explain the high incidence of paradoxical hypertension.

  11. Project Radiation Protection East. Swedish cooperation program for radiation protection in Eastern and Central Europe. Status Report, March 1996

    International Nuclear Information System (INIS)

    Snihs, J.O.; Johansson, Mai; Grapengiesser, S.; Bennerstedt, T.

    1996-04-01

    Until now the Swedish program for radiation protection work in central and Eastern europe has been granted 55 MSEK by the Swedish government. The projects are assessed, planned and performed in close cooperation with partner organizations in the East. Since 1994, radiation protection cooperation concerning the former Soviet Navy training reactors in Paldiski, Estonia, is included in Radiation Protection East. The government has granted 8 MSEK for this purpose. This report presents a summary over some 150 projects, their status, allocated funds and their distribution over countries and project areas. The presentation is updated up to March 1996. 7 figs

  12. Flat-plate solar array project. Volume 8: Project analysis and integration

    Science.gov (United States)

    Mcguire, P.; Henry, P.

    1986-01-01

    Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.

  13. Cancer Incidence in Five Continents: Inclusion criteria, highlights from Volume X and the global status of cancer registration.

    Science.gov (United States)

    Bray, F; Ferlay, J; Laversanne, M; Brewster, D H; Gombe Mbalawa, C; Kohler, B; Piñeros, M; Steliarova-Foucher, E; Swaminathan, R; Antoni, S; Soerjomataram, I; Forman, D

    2015-11-01

    Cancer Incidence in Five Continents (CI5), a longstanding collaboration between the International Agency for Research on Cancer and the International Association of Cancer Registries, serves as a unique source of cancer incidence data from high-quality population-based cancer registries around the world. The recent publication of Volume X comprises cancer incidence data from 290 registries covering 424 populations in 68 countries for the registration period 2003-2007. In this article, we assess the status of population-based cancer registries worldwide, describe the techniques used in CI5 to evaluate their quality and highlight the notable variation in the incidence rates of selected cancers contained within Volume X of CI5. We also discuss the Global Initiative for Cancer Registry Development as an international partnership that aims to reduce the disparities in availability of cancer incidence data for cancer control action, particularly in economically transitioning countries, already experiencing a rapid rise in the number of cancer patients annually. © 2015 UICC.

  14. Breathing circuit compliance and accuracy of displayed tidal volume during pressure-controlled ventilation of infants: A quality improvement project.

    Science.gov (United States)

    Glenski, Todd A; Diehl, Carrie; Clopton, Rachel G; Friesen, Robert H

    2017-09-01

    Anesthesia machines have evolved to deliver desired tidal volumes more accurately by measuring breathing circuit compliance during a preuse self-test and then incorporating the compliance value when calculating expired tidal volume. The initial compliance value is utilized in tidal volume calculation regardless of whether the actual compliance of the breathing circuit changes during a case, as happens when corrugated circuit tubing is manually expanded after the preuse self-test but before patient use. We noticed that the anesthesia machine preuse self-test was usually performed on nonexpanded pediatric circuit tubing, and then the breathing circuit was subsequently expanded for clinical use. We aimed to demonstrate that performing the preuse self-test in that manner could lead to incorrectly displayed tidal volume on the anesthesia machine monitor. The goal of this quality improvement project was to change the usual practice and improve the accuracy of displayed tidal volume in infants undergoing general anesthesia. There were four stages of the project: (i) gathering baseline data about the performance of the preuse self-test and using infant and adult test lungs to measure discrepancies of displayed tidal volumes when breathing circuit compliance was changed after the initial preuse self-test; (ii) gathering clinical data during pressure-controlled ventilation comparing anesthesia machine displayed tidal volume with actual spirometry tidal volume in patients less than 10 kg before (machine preuse self-test performed while the breathing circuit was nonexpanded) and after an intervention (machine preuse self-test performed after the breathing circuit was fully expanded); (iii) performing department-wide education to help implement practice change; (iv) gathering postintervention data to determine the prevalence of proper machine preuse self-test. At constant pressure-controlled ventilation through fully expanded circuit tubing, displayed tidal volume was 83

  15. Current status of JMTR refurbishment project

    International Nuclear Information System (INIS)

    Kaminaga, Masanori; Niimi, Motoji; Hori, Naohiko; Takahashi, Kunihiro; Kanno, Masaru; Nakagawa, Tetsuya; Nagao, Yoshiharu; Ishihara, Masahiro; Kawamura, Hiroshi

    2010-02-01

    The JMTR is a light water moderated and cooled, beryllium reflected tank- type reactor using LUE silicide plate-type fuels. Its thermal power is 50 MW, maximum thermal and fast neutron flux is 4x10 18 m -2 s -1 . First criticality was achieved in March 1968, and its operation was stopped from August, 2006 for the refurbishment. The refurbishment is scheduled from the beginning of FY2007 to the end of FY2010. The renewed and upgraded JMTR will be re-started from FY2011. An investigation on aged components (aged-investigation) was carried out for concrete structures of the JMTR reactor building, exhaust stack, etc., and for tanks in the primary cooling system, heat exchangers, pipes in the secondary cooling system, cooling tower, emergency generators and so on, in order to identify their integrity. The aged-investigation was carried out at the beginning of FY2007. As a result, some components were decided to replace from viewpoints of future maintenance and improvement of reliability, and some components or structures were decided to repair. A visual inspection of inner side of the pressure vessel was carried out using an underwater camera in FY2008, and no serious damage was observed. Up to now, refurbishment works are in progress according to the planned schedule. In FY2009, motors of primary cooling pumps, secondary cooling pumps, motors of drain pumps, pump in the primary water transfer line to the water purification system, beryllium reflector frame, low-voltage motor control centers are to be replaced. A nuclear instrumentation system, process control system, safety protection system and so on are to be replaced in FY2010. In this paper, current status of JMTR refurbishment project is presented. (author)

  16. Current status of decommissioning projects and their strategies in advanced countries

    Energy Technology Data Exchange (ETDEWEB)

    Chung, U. S.; Lee, K. W.; Hwang, D. S.; Park, S. K.; Hwang, S. T.; Paik, S. T.; Park, J. H.; Choi, Y. D.; Chung, K. H.; Lee, K. I.; Hong, S. B

    2007-06-15

    At the Korea Atomic Energy Research Institute(KAERI), two projects for decommissioning of the research reactors and uranium conversion plant are carried out. The number of nuclear facilities to be dismantled will be much increased in future and the decommissioning industries will be enlarged. Keeping pace with this increasing tendency, each country formulated their own strategies and regulation systems, and applied their own technologies. The international organizations such as the IAEA and the OECD/NEA also prepared standards in technologies and regulation upon decommissioning and recommended to adopt them to the decommissioning projects. These strategies and technologies are very different country by country due to the different site dependent conditions and it will not be reasonable to evaluate their merits and weakness. The world wide status of the decommissioning, highlighted on that of 5 countries of USA, UK, France, Germany and Japan because they are advanced counties in nuclear industries, are summarized and their site specific conditions are evaluated. The scopes of the evaluation are decommissioning strategies, licensing procedures and requirements focused on decommissioning plan, waste management, technology development and so on. The detailed decommissioning progresses of several typical example sites were introduced. The activities on decommissioning field of the international organization, increased according to the enlarged decommissioning industries, are also summarized.

  17. Current status of decommissioning projects and their strategies in advanced countries

    International Nuclear Information System (INIS)

    Chung, U. S.; Lee, K. W.; Hwang, D. S.; Park, S. K.; Hwang, S. T.; Paik, S. T.; Park, J. H.; Choi, Y. D.; Chung, K. H.; Lee, K. I.; Hong, S. B.

    2007-06-01

    At the Korea Atomic Energy Research Institute(KAERI), two projects for decommissioning of the research reactors and uranium conversion plant are carried out. The number of nuclear facilities to be dismantled will be much increased in future and the decommissioning industries will be enlarged. Keeping pace with this increasing tendency, each country formulated their own strategies and regulation systems, and applied their own technologies. The international organizations such as the IAEA and the OECD/NEA also prepared standards in technologies and regulation upon decommissioning and recommended to adopt them to the decommissioning projects. These strategies and technologies are very different country by country due to the different site dependent conditions and it will not be reasonable to evaluate their merits and weakness. The world wide status of the decommissioning, highlighted on that of 5 countries of USA, UK, France, Germany and Japan because they are advanced counties in nuclear industries, are summarized and their site specific conditions are evaluated. The scopes of the evaluation are decommissioning strategies, licensing procedures and requirements focused on decommissioning plan, waste management, technology development and so on. The detailed decommissioning progresses of several typical example sites were introduced. The activities on decommissioning field of the international organization, increased according to the enlarged decommissioning industries, are also summarized

  18. Projection models for health effects assessment in populations exposed to radioactive and nonradioactive pollutants. Volume IV. SPAHR user's guide

    International Nuclear Information System (INIS)

    Collins, J.J.; Lundy, R.T.

    1982-09-01

    The Simulation Package for the Analysis of Health Risk (SPAHR) is a computer software package based upon a demographic model for health risk projections. The model extends several health risk projection models by making realistic assumptions about the population at risk, and thus represents a distinct improvement over previous models. Complete documentation for use of SPAHR is contained in this five-volume publication. The demographic model in SPAHR estimates population response to environmental toxic exposures. Latency of response, changing dose level over time, competing risks from other causes of death, and population structure can be incorporated into SPAHR to project health risks. Risks are measured by morbid years, number of deaths, and loss of life expectancy. Comparisons of estimates of excess deaths demonstrate that previous health risk projection models may have underestimated excess deaths by a factor of from 2 to 10, depending on the pollutant and the exposure scenario. The software supporting the use of the demographic model is designed to be user oriented. Complex risk projections are made by responding to a series of prompts generated by the package. The flexibility and ease of use of SPAHR make it an important contribution to existing models and software packages. This volume gives the more advanced user of the SPAHR computer package the information required to create tailor-made programs for addressing specific issues not covered by the three interactive packages. It assumes that the user is familiar with the concepts and terms relating to demography and health risk assessment

  19. Technical support for GEIS: radioactive waste isolation in geologic formations. Volume 2. Commercial waste forms, packaging and projections for preconceptual repository design studies

    Energy Technology Data Exchange (ETDEWEB)

    1978-04-01

    This volume, Y/OWI/TM-36/2, ''Commercial Waste Forms, Packaging and Projections for Preconceptual Repository Design Studies,'' is one of a 23-volume series, ''Technical Support for GEIS: Radioactive Waste Isolation in Geologic Formations,'' Y/OWI/TM-36, which supplements the ''Contribution to Draft Generic Environmental Impact Statement on Commercial Waste Management: Radioactive Waste Isolation in Geologic Formations,'' Y/OWI/TM-44. The series provides a more complete technical basis for the preconceptual designs, resource requirements, and environmental source terms associated with isolating commercial LWR wastes in underground repositories in salt, granite, shale and basalt. Wastes are considered from three fuel cycles: uranium and plutonium recycling, no recycling of spent fuel and uranium-only recycling. This volume contains the data base for waste forms, packages, and projections from the commercial waste defined by the Office of Waste Isolation in ''Nuclear Waste Projections and Source Term Data for FY 1977,'' Y/OWI/TM-34. Also, as an alternative data base for repository design and analysis, waste forms, packages, and projections for commercial waste defined by Battelle Pacific Northwest Laboratory (BPNL) have been included. This data base consists of a reference case for use in the alternative design study and a definition of combustible wastes for use in mine fire and hydrogen generation analyses.

  20. The status report on the nuclear data project in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Kim, G.N.; Baek, W.Y.; Kang, H.S.; Choi, J.Y.; Cho, M.H.; Ko, I.S.; Namkung, W. [Pohang Accelerator Laboratory, POSTECH, Pohang (Korea, Republic of); Chang, J.H.

    1999-03-01

    The nuclear data project as one of the nation-wide nuclear R and D programs was launched by the Korea Atomic Energy Research Institute (KAERI) in 1996. Its main goals are to establish a nuclear data system, to construct the infrastructure for the nuclear data productions and evaluations, and to develop a highly reliable nuclear data system. In order to build the infrastructure for the nuclear data production, KAERI wants to build an intense pulsed neutron source by utilizing accelerator facilities, technologies, and manpower at the Pohang Accelerator Laboratory (PAL). The PAL proposed the Pohang Neutron Facility (PNF), which consists of a 100-MeV electron linac, a water-cooled Ta target, and at least three different time-of-flight (TOF) paths. The 100-MeV electron linac was designed and constructed based on experiences obtained from construction and operation of the 2-GeV linac at PAL. We report a status report on the nuclear data production and evaluation in Korea. (author)

  1. Status report EFF and EAF projects

    International Nuclear Information System (INIS)

    Gruppelaar, H.; Kopecky, J.

    1990-08-01

    The European Fusion File (EFF) project and the associated European Activation File Project (EAF) are sponsored by the European Community's Fusion Technology Programme. The 1st programme is directed to the short-term needs of the NET team, which designs the Next European Torus, while the 2nd program is directed to long-term needs in the development of a Fusion Demonstration Reactor, in particular in connection with the study of low-activation materials. Various European laboratories participate in this project. The programme of the EFF-project is in its 2nd phase, after the successful completion of the EFF-1 data file. The emphasis on the 1st phase was on the improvement of the tritium breeding and neutron multiplication cross sections, while the 2nd phase emphasizes the improvement of a shielding data base. The progress of this 2nd phase is described. (author). 1 tab

  2. A Study of Job Demands and Curriculum Development in Agricultural Training Related to the Muskegon County Wastewater Management System. Final Report. Volume I. An Overview of the Research Project.

    Science.gov (United States)

    Fisher, Harold S.; And Others

    This volume is one of a four-volume final report of a research project developed to identify the jobs and training needs for the area of wastewater land treatment systems and related agricultural occupations. The overall purpose of the project is presented in terms of its six subobjectives: (1) To identify the agricultural occupations related to…

  3. The ADVANCE project: Formal evaluation of the targeted deployment. Volume 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    ADVANCE [Advanced Driver and Vehicle Advisory Navigation ConcEpt] was a public/private partnership conceived and developed by four founding parties. The founding parties include the Federal Highway Administration (FHWA), the Illinois Department of Transportation (IDOT), the University of Illinois at Chicago and Northwestern University operating together under the auspices of the Illinois Universities Transportation Research Consortium (IUTRC), and Motorola, Inc. The major responsibilities of each party are fully described in the Project agreement. Subsequently, these four were joined on the Steering Committee by the American Automobile Association (AAA). This unique blending of public sector, private sector and university interests, augmented by more than two dozen other private sector participants, provided a strong set of resources for ADVANCE. The ADVANCE test area covered over 300 square miles including portions of the City of Chicago and 40 northwest suburban communities. The Project encompasses the high growth areas adjacent to O`Hare International Airport, the Schaumbura/Hoffman Estates office and retail complexes, and the Lake-Cook Road development corridor. It also includes major sports and entertainment complexes such as the Arlington International Racecourse and the Rosemont Horizon. The population in the area is more than 750,000. This volume provides a summary of the insights and achievements made as a result of this field test, and selected appendices containing more detailed information.

  4. Status Report: Mathematics Curriculum-Development Projects Today

    Science.gov (United States)

    Arithmetic Teacher, 1972

    1972-01-01

    Brief reports on the Cambridge Conference on School Mathematics, Comprehensive School Mathematics Program, Computer-Assisted Instruction Projects at Stanford, Individually Prescribed Instruction Project, The Madison Project, Mathematics/Science Learning System, MINNEMAST, and School Mathematics Study Group. (MM)

  5. Development of energy-efficient comfortable ventilation systems with air quality guided volume flow control and continuous monitoring of the window opening status. Part 1. Use of the LuQaS triple sensor for air quality guided volume flow control of mechanical ventilation systems in domestic buildings. Research project; Entwicklung energieeffizienter Komfortlueftungsanlagen mit luftqualitaetsgefuehrter Volumenstromregelung und kontinuierlicher Erfassung des Fensteroeffnungszustandes. Teilbericht 1. Einsatz des LuQaS-Triple-Sensors zur luftqualitaetsgefuehrten Volumenstromregelung von mechanischen Lueftungsanlagen in Wohngebaeuden. Forschungsprojekt

    Energy Technology Data Exchange (ETDEWEB)

    Grossklos, Marc; Ebel, Witta; Knissel, Jens

    2011-05-15

    The report presents the preparatory work on the research project of the above title. The first chapter presents a status report on air quality monitoring inside rooms and evaluates the projects so far in which the LuQaS air quality sensor was used. The second chapter is a documentation of preliminary measurements using the LuQaS sensor in two passive residential buildings and several individual measurements for sensor calibration. It was found that in apartments with mechanical ventilation, the sensor reflects the user activities; further, the measured values indicate signal changes also in the off-air of the building, so that control via central sensors in the ventilation and off-air systems appears feasible. The third chapter discusses control strategies for air quality control. Apart from a discussion of control unit types, operating regimes, methods to determine rated values, and additional control functions, the effects of threshold value control with different threshold limit values and volume flow changes on the air quality of a model building was simulated. The results prove the expectation that the air quality inside a building will be influenced positively by air quality control. Theoretical investigations of the DrD method will be presented in another part-report of the project.

  6. Current status of food irradiation in overseas (2013). From the meeting report of RCA food irradiation project

    International Nuclear Information System (INIS)

    Todoriki, Setsuko

    2013-01-01

    The report introduces the activity of RCA (Regional Cooperative Agreement for Research Development and Training Related to Nuclear Science and Technology for Asia and Pacific) food irradiation project (RAS/5/057) and information obtained at the two workshops on current status of Asia and Pacific areas together with EU, USA and Japan. Also current trends of RAS/5/057 Implementing Best Practices for food irradiation for plant sanitary and phytosanitary purposes are described. Amount of food irradiation products of RCA member countries, minimum adopted doses for quarantine harmful insects (70 to 232 Gy) and import amount of fruits of USA (79 to 5500 tons) are tabulated. Finally current status of Japan is explained. (S. Ohno)

  7. Pingston hydroelectric project - stage 2 project report : volume 1 of 2

    International Nuclear Information System (INIS)

    1999-01-01

    The British Columbia Environmental Assessment Office has reviewed an application by Canadian Hydro Developers (B.C.) Inc., to develop the Pingston Hydroelectric Project, a run-of-river facility, located 60 km south of Revelstoke, British Columbia. The review includes an evaluation of any social and environmental impacts, including the effects on migratory birds, small mammals, amphibians, fish, wildlife, water quality, noise and visual aspects, that would be associated with the project. One consideration in selecting the project site was its ease of access along existing roadways and close proximity to power lines, another, the absence of any potential effects on fish and fish habitat. The project is also expected to have a negligible effect on water quality- related matters such as sediment transport, nutrient trapping in the headpond, and movement of large organic debris through the system. The project will not impact on archaeological resources, offers a renewable supply of energy and represents an overall positive effect on air quality for British Columbia. BC Hydro has committed to providing electrical interconnection to the main grid. 9 refs., 5 tabs., 14 figs., 9 appendices

  8. Status of Standardization Projects

    Science.gov (United States)

    1991-06-30

    MCA GL G4 913 914 914 A GL SA 50 SS N D 8915 TOTAL- 6. DELINQUENT- 0. STATUS CODES: A- 5, G- 1. Y- 0, Z- 0 8920 0539 MIL R 35084A RICE INSTANT ENRICHED...44171GL CARROTS GLA POW GL H5 904 914 914 A N D 8940 A693 MIL N 44178GL NOODLES PARMESAN AND ROMA GL H5 904 914 914 A N D 8940 A694 MIL P 44181GL PIE...20184 COFFEE INSTANT GL B4 A 893 903 913 A GL SA 50 SS U B 8955 0062 MIL T 3527D I NOT 1 TEA INSTANT GL H5 912 921 921 A GL SA 50 SS N 8955 TOTAL- 2

  9. Status and Mission Applicability of NASA's In-Space Propulsion Technology Project

    Science.gov (United States)

    Anderson, David J.; Munk, Michelle M.; Dankanich, John; Pencil, Eric; Liou, Larry

    2009-01-01

    The In-Space Propulsion Technology (ISPT) project develops propulsion technologies that will enable or enhance NASA robotic science missions. Since 2001, the ISPT project developed and delivered products to assist technology infusion and quantify mission applicability and benefits through mission analysis and tools. These in-space propulsion technologies are applicable, and potentially enabling for flagship destinations currently under evaluation, as well as having broad applicability to future Discovery and New Frontiers mission solicitations. This paper provides status of the technology development, near-term mission benefits, applicability, and availability of in-space propulsion technologies in the areas of advanced chemical thrusters, electric propulsion, aerocapture, and systems analysis tools. The current chemical propulsion investment is on the high-temperature Advanced Material Bipropellant Rocket (AMBR) engine providing higher performance for lower cost. Investments in electric propulsion technologies focused on completing NASA's Evolutionary Xenon Thruster (NEXT) ion propulsion system, a 0.6-7 kW throttle-able gridded ion system, and the High Voltage Hall Accelerator (HiVHAC) thruster, which is a mid-term product specifically designed for a low-cost electric propulsion option. Aerocapture investments developed a family of thermal protections system materials and structures; guidance, navigation, and control models of blunt-body rigid aeroshells; atmospheric models for Earth, Titan, Mars and Venus; and models for aerothermal effects. In 2009 ISPT started the development of propulsion technologies that would enable future sample return missions. The paper describes the ISPT project's future focus on propulsion for sample return missions. The future technology development areas for ISPT is: Planetary Ascent Vehicles (PAV), with a Mars Ascent Vehicle (MAV) being the initial development focus; multi-mission technologies for Earth Entry Vehicles (MMEEV) needed

  10. Alligator rivers analogue project. Final report; volume 1; summary of findings

    International Nuclear Information System (INIS)

    Duerden, P.; Lever, D.A.; Sverjensky, D.A.; Townley, L.R.

    1992-01-01

    The Koongarra uranium ore deposit is located in the Alligator Rivers Region of the Northern Territory of Australia. Many of the processes that have controlled the development of this natural system are relevant to the performance assessment of radioactive waste repositories. An agreement was reached in 1987 by a number of agencies concerned with radioactive waste disposal to set up the International Alligator Rivers Analogue Project (ARAP) to study relevant aspects of the hydrological and geochemical evolution of the site. The Project ran for five years. The aims of the study were: to contribute to the production of reliable and realistic models for radionuclide migration within geological environments relevant to the assessment of the safety of radioactive waste repositories; to develop methods of validation of models using a combination of laboratory and field data associated with the Koongarra uranium deposit; and to encourage maximum interaction between modellers and experimentalists in achieving these objectives. It was anticipated that the substantial databases generated in the field and laboratory studies would then be used to develop and test geochemical and radionuclide transport models. The findings from the technical studies are discussed in the context of assessments of the long-term performance of geological repositories for radioactive wastes, which are being undertaken in many countries. They are also considered in an integrated 'Scenario Development' approach, aimed to understand the formation of the ore deposit. Despite their inherent uncertainties, the findings provide a basis for assessing the way in which radionuclides will migrate in environments with a variety of geologic settings and over a range of different geologic timescales. This summary report, which highlights the work and findings of the Alligator Rivers Analogue Project is one of a series of 16 volumes

  11. Medical Data Architecture Project Status

    Science.gov (United States)

    Krihak, M.; Middour, C.; Lindsey, A.; Marker, N.; Wolfe, S.; Winther, S.; Ronzano, K.; Bolles, D.; Toscano, W.; Shaw, T.

    2017-01-01

    The Medical Data Architecture (MDA) project supports the Exploration Medical Capability (ExMC) risk to minimize or reduce the risk of adverse health outcomes and decrements in performance due to in-flight medical capabilities on human exploration missions. To mitigate this risk, the ExMC MDA project addresses the technical limitations identified in ExMC Gap Med 07: We do not have the capability to comprehensively process medically-relevant information to support medical operations during exploration missions. This gap identifies that the current International Space Station (ISS) medical data management includes a combination of data collection and distribution methods that are minimally integrated with on-board medical devices and systems. Furthermore, there are variety of data sources and methods of data collection. For an exploration mission, the seamless management of such data will enable an increasingly autonomous crew than the current ISS paradigm. The MDA will develop capabilities that support automated data collection, and the necessary functionality and challenges in executing a self-contained medical system that approaches crew health care delivery without assistance from ground support. To attain this goal, the first year of the MDA project focused on reducing technical risk, developing documentation and instituting iterative development processes that established the basis for the first version of MDA software (or Test Bed 1). Test Bed 1 is based on a nominal operations scenario authored by the ExMC Element Scientist. This narrative was decomposed into a Concept of Operations that formed the basis for Test Bed 1 requirements. These requirements were successfully vetted through the MDA Test Bed 1 System Requirements Review, which permitted the MDA project to begin software code development and component integration. This paper highlights the MDA objectives, development processes, and accomplishments, and identifies the fiscal year 2017 milestones and

  12. The modulation of the phosphorylation status of NKCC1 in organ cultured bovine lenses: Implications for the regulation of fiber cell and overall lens volume.

    Science.gov (United States)

    Vorontsova, Irene; Donaldson, Paul J; Kong, Zhiying; Wickremesinghe, Chiharu; Lam, Leo; Lim, Julie C

    2017-12-01

    In previous work, we have shown the Sodium/Potassium/2 Chloride Cotransporter (NKCC1) to be a key effector of lens fiber cell volume regulation. Since others have shown that the activity of NKCC1 is regulated via its phosphorylation status, the purpose of this study was to investigate whether NKCC1 phosphorylation can be modulated in organ cultured bovine lenses, and to see how this relates to changes in lens wet weight. Western blotting was first used to confirm the expression of NKCC1, phosphorylated NKCC1 (NKCC1-P) and the regulatory kinases WNK/SPAK and phosphatases PP1/PP2A in bovine lenses at the protein level. Changes to NKCC1-P status were then assessed by organ culturing bovine lenses in either isotonic, hypertonic or hypotonic solutions in the presence or absence of the NKCC inhibitor, bumetanide, or phosphatase inhibitors okadaic acid and calyculin A. After 1-22 h of culturing, lenses were weighed, assessed for transparency and the cortical protein fractions analyzed by western blot using antibodies to detect total NKCC1 and NKCC1-P. NKCC1, NKCC1-P, SPAK, PP1 and PP2A were all detected in the membrane fraction of bovine lenses. Under hypertonic conditions, NKCC1 is phosphorylated and activated to mediate a regulatory volume increase. Finally, NKCC1-P signal increased in the presence of phosphatase inhibitors indicating that PP1/PP2A can dephosphorylate NKCC1. These results show that the phosphorylation status and hence activity of NKCC1 is dynamically regulated and that in response to hypertonic stress, NKCC1 activity is increased to effect a regulatory volume increase that limits cell shrinkage. These findings support the view that the lens dynamically regulates ion fluxes to maintain steady state lens volume, and suggest that dysfunction of this regulation maybe an initiating factor in the localized fiber cell swelling that is a characteristic of diabetic lens cataract. Copyright © 2017 Elsevier Ltd. All rights reserved.

  13. Baltic NPP Project specifics and current status

    International Nuclear Information System (INIS)

    2011-01-01

    Project overview: 2 x 1194 MW Units (AES-2006 series); Location in Kaliningrad region of the; Russian Federation; Operation dates: Unit 1 – Oct 2016; Unit 2 – Apr 2018; Site preparatory works ongoing. This is first NPP project in the Russian Federation providing opportunity for participation of foreign investors. Foreign investors may acquire up to 49% share. Cross-border transmission lines developed under separate project with participation of foreign investors. Conclusion: At the selected set of assumptions, the project is financially feasible in all scenarios

  14. Status report on the Experimental Boiling Water Reactor (EBWR) Decontamination and Decommissioning (D ampersand D) Project

    International Nuclear Information System (INIS)

    Sears, L.; Garlock, G.; Mencarelli, R.; Fellhauer, C.

    1994-01-01

    ALARON Corporation is under contract, to Argonne National Laboratory - East (ANL-E), to complete the decontamination and decommissioning of the Experimental Boiling Water Reactor (EBWR). The project, begun, in 1986 by ANL-E personnel, is projected to be completed by the end of 1994. The final phase of work was awarded to ALARON in December 1993 with the scope of work including the disassembly and removal of all remaining reactor internals, the reactor vessel, the lead bio-shield, the core liner, and the activated portion of the concrete bio-shield. This paper discusses the work undertaken beginning in January 1994 and continuing through July 1994. During this period the required pre-mobilization documentation was prepared and approved, mobilization was completed, and the reactor internals, reactor vessel, lead bio-shield and core liner were removed. The paper will compare the planned schedule to the actual schedule, discuss problems encountered, review volume reduction techniques and health and safety issues including radiological aspects of the project

  15. [Hospital variation in anastomotic leakage after rectal cancer surgery in the Spanish Association of Surgeons project: The contribution of hospital volume].

    Science.gov (United States)

    Ortiz, Héctor; Biondo, Sebastiano; Codina, Antonio; Ciga, Miguel Á; Enríquez-Navascués, José; Espín, Eloy; García-Granero, Eduardo; Roig, José Vicente

    2016-04-01

    This multicentre observational study aimed to determine the anastomotic leak rate in the hospitals included in the Rectal Cancer Project of the Spanish Society of Surgeons and examine whether hospital volume may contribute to any variation between hospitals. Hospital variation was quantified using a multilevel approach on prospective data derived from the multicentre database of all adenocarcinomas of the rectum operated by an anterior resection at 84 surgical departments from 2006 to 2013. The following variables were included in the analysis; demographics, American Society of Anaesthesiologists classification, use of defunctioning stoma, tumour location and stage, administration of neoadjuvant treatment, and annual volume of elective surgical procedures. A total of 7231 consecutive patients were included. The rate of anastomotic leak was 10.0%. Stratified by annual surgical volume hospitals varied from 9.9 to 11.3%. In multilevel regression analysis, the risk of anastomotic leak increased in male patients, in patients with tumours located below 12 cm from the anal verge, and advanced tumour stages. However, a defunctioning stoma seemed to prevent this complication. Hospital surgical volume was not associated with anastomotic leak (OR: 0.852, [0.487-1.518]; P=.577). Furthermore, there was a statistically significant variation in anastomotic leak between all departments (MOR: 1.475; [1.321-1.681]; P<0.001). Anastomotic leak varies significantly among hospitals included in the project and this difference cannot be attributed to the annual surgical volume. Copyright © 2015 AEC. Publicado por Elsevier España, S.L.U. All rights reserved.

  16. Hospital variability in postoperative mortality after rectal cancer surgery in the Spanish Association of Surgeons project: The impact of hospital volume.

    Science.gov (United States)

    Ortiz, Héctor; Biondo, Sebastiano; Codina, Antonio; Ciga, Miguel Á; Enríquez-Navascués, José M; Espín, Eloy; García-Granero, Eduardo; Roig, José Vicente

    2016-01-01

    This multicentre observational study examines variation between hospitals in postoperative mortality after elective surgery in the Rectal Cancer Project of the Spanish Society of Surgeons and explores whether hospital volume and patient characteristics contribute to any variation between hospitals. Hospital variation was quantified using a multilevel approach on prospective data derived from the multicentre database of all rectal adenocarcinomas operated by an anterior resection or an abdominoperineal excision at 84 surgical departments from 2006 to 2013. The following variables were included in the analysis; demographics, American Society of Anaesthesiologists classification, tumour location and stage, administration of neoadjuvant treatment, and annual volume of surgical procedures. A total of 9809 consecutive patients were included. The rate of 30-day postoperative mortality was 1.8% Stratified by annual surgical volume hospitals varied from 1.4 to 2.0 in 30-day mortality. In the multilevel regression analysis, male gender (OR 1.623 [1.143; 2.348]; P<.008), increased age (OR: 5.811 [3.479; 10.087]; P<.001), and ASA score (OR 10.046 [3.390; 43.185]; P<.001) were associated with 30-day mortality. However, annual surgical volume was not associated with mortality (OR 1.309 [0.483; 4.238]; P=.619). Besides, there was a statistically significant variation in mortality between all departments (MOR 1.588 [1.293; 2.015]; P<.001). Postoperative mortality varies significantly among hospitals included in the project and this difference cannot be attributed to the annual surgical volume. Copyright © 2015 AEC. Publicado por Elsevier España, S.L.U. All rights reserved.

  17. Photovoltaic concentrator technology development project. Sixth project integration meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-01

    Thirty-three abstracts and short papers are presented which describe the current status of research, development, and demonstration of concentrator solar cell technology. Solar concentrators discussed include the parabolic trough, linear focus Fresnel lens, point focus Fresnel lens, and the parabolic dish. Solar cells studied include silicon, GaAs, and AlGaAs. Research on multiple junction cells, combined photovoltaic/thermal collectors, back contact solar cells, and beam splitter modules is described. Concentrator solar cell demonstration programs are reported. Contractor status summaries are given for 33 US DOE concentrator solar cell contracts; a description of the project, project status, and key results to date is included. (WHK)

  18. Social status of rural women in the focus of a developmental project

    Directory of Open Access Journals (Sweden)

    Stjepanović-Zaharijevski Dragana

    2006-01-01

    Full Text Available One of the goals of the project called "The milky river", which deals with the integral development of the dairy production, is to initiate the development of the sustainable and profitable production of milk and dairy products through grouping producers and supporting their position in the society they live in. Women are more than men engaged in the dairy production chain and they have a direct view of the whole dairy production process. So it was necessary to adapt the grouping to their needs, as well as to make some practical mechanisms of their involvement in the project activities. In this way, the strategy of the project helped with offering equal chances to women and men, and by reducing the gender inequality, it also helped with making a chance for a new life perspective for women. Through interviews and by focus-grouping the data were collected which represented the first picture of the dairy production in the region of Niš, including its gender characteristics, among other things. Two years later, the qualitative analysis of the indicators of the rural women’s social status in this region in the context of the realization of the project activities, has shown that there has been an important movement forward towards the gender equality which can be attributed to the successful project implementation. Women, as an important factor in the dairy production chain, seem to be joined and encouraged. They seem to be empowered at the level of their knowledge decision making and autonomous activity taking through various forms of education, joint farmer group work, as well as through various forms of cooperation with supporting institutions and other partners within the project activity framework. The overwhelming impression seems to be that joint work and cooperation are necessary conditions for the development of any individual farmers’ production, as well as for the referent rural development which requires the support of all the

  19. Defense Standardization Program Status of Standardization Projects

    Science.gov (United States)

    1993-09-30

    11352 AT Fl 902 903 903 A AT N C 25GP TOTAL - I , DELINQUENT - 1 , STATUS CODES: A - 1 , G - 0 , Y - 0 , Z - 0 2610 F158 TRA-YB TIRE & RIM ASSOCIATION...MECHANICAL SH H5 923 924 924 A SH N C3950 N047 MIL-L-29250B LOADING JACK SYSTEM ISO CON YDV 02 932 943 943 A N 3950 TOTAL - 9 ,DELINQUENT - 5 ,STATUS CODES...SECURITY LABEL DC B4 BP 931 951 951 A SC OM 90 NS N DCPS 0012 INCORPORATE SONS PROTOCOLS INTO OSI ol B4 BP 932 954 954 A SC OM 90 NS N DCPS 0012 02 ISO

  20. The status of DESY H- - sources

    International Nuclear Information System (INIS)

    Peters, J.

    1996-01-01

    Two different types of H - sources are operated at DESY, a magnetron source and an rf- driven volume source. H - sources for HERA have to run for long uninterrupted periods with a low duty factor and a high reliability. Several necessary improvements are under construction for our rf - driven volume source. The status of both our magnetron and our volume source will be discussed and the first LINAC III experiment with the rf-driven volume source will be presented. (author)

  1. Development of energy-efficient comfort ventilation plants with air quality controlled volume flow rate and continuous detection of the status of the windows aperture. Part 3. Final report with documentation of the field test; Entwicklung energieeffizienter Komfortlueftungsanlagen mit luftqualitaetsgefuehrter Volumenstromregelung und kontinuierlicher Erfassung des Fensteroeffnungszustandes. Teilbericht 3. Endbericht mit Dokumentation des Feldtests

    Energy Technology Data Exchange (ETDEWEB)

    Grossklos, Marc; Hacke, Ulrike [Institut Wohnen und Umwelt GmbH, Darmstadt (Germany)

    2012-10-25

    Residential ventilation systems with a heat recovery contribute to the improvement of the air quality and to the reduction of heat losses caused by ventilation. An additional opening of the windows in residential buildings results in a clearly increasing consumption of thermal heat because the thermal heat of the out coming air cannot be utilized furthermore. Continuous information on the energetic effects of the opening of windows is helpful. Under this aspect, the authors of the contribution under consideration report on the development of energy efficient comfort ventilation systems with an air quality controlled volume flow rate and continuous detection of the status of the windows aperture. The contribution under consideration is the third part of a project concerning to this theme. This part encompasses a field test with four single-family houses in which the air quality control as well as the detection of the status of the windows aperture is tested and optimized for a long period. This contribution also contains the results of the second part of the project. The second project investigate the technical implementation of a air quality regulation at prototypes and test facilities.

  2. Evaluation of conducting a screening assessment of nutritional status of hospitalized patients. Presentation of main goals and objectives of the global health project "NutritionDay".

    Science.gov (United States)

    Jeznach-Steinhagen, Anna; Ostrowska, Joanna; Czerwonogrodzka-Senczyna, Aneta

    2016-01-01

    European Society for Clinical Nutrition and Metabolism (ESPEN) commenced in 2004 a global health project named "NutritionDay" aiming to promote awareness of proper nutritional status of hospitalized patients and to draw attention to the need for early detection of malnutrition among patients. Under the Polish law--pursunat to the regulation of the Minister of Health dated September 15, 2011 (amendment as of 27.12.2013)--a nutritional status of each patient should be assessed at the time of a hospital admission. of this study was to analyze the fulfilment of the mandatory questionnaire assessment of nutritional status at selected wards of one of Warsaw's clinical hospitals. The study included an analysis of medical records of patients hospitalized within 6 months (n = 26375). The correct fulfilment of screening questionnaire assessing nutritional status (NRS 2002 survey) and the information about patients' body weight as well as the results assessment of nutritional status were subject to the analysis. NRS 2002 questionnaire was present in only 67,14% medical records of patients, however 49.24% of them were unfilled. The obtained results confirming low degree of NRS 2002 questionnaires' fulfilment in one of the Warsaw clinical hospitals draws attention to the need for education of hospital personnel in the field of significance of screening of nutritional assessment and its regulations. The "NutritionDay" project is an interesting form to attract attention of the aforementioned problem and its global extent additionally encourage medical units to participate in the project.

  3. Integrating model of the Project Independence Evaluation System. Volume VI. Data documentation. Part I

    Energy Technology Data Exchange (ETDEWEB)

    Allen, B J

    1979-02-01

    This documentation describes the PIES Integrating Model as it existed on January 1, 1978. This volume contains two chapters. In Chapter I, Overview, the following subjects are briefly described: supply data, EIA projection series and scenarios, demand data and assumptions, and supply assumptions - oil and gas availabilities. Chapter II contains supply and demand data tables and sources used by the PIES Integrating Model for the mid-range scenario target years 1985 and 1990. Tabulated information is presented for demand, price, and elasticity data; coal data; imports data; oil and gas data; refineries data; synthetics, shale, and solar/geothermal data; transportation data; and utilities data.

  4. Licensing Status of New and Expanding In-Situ Recovery Uranium Projects in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Catchpole, G.; Thomas, M., E-mail: gccatchpole@uranerz.com [Uranerz Energy Corporation (URZ), Casper, WY (United States)

    2014-05-15

    The authors investigated the licensing status of new in-situ recovery (“ISR”) uranium projects, as well as the expansion of existing projects, within the United States (“US”). Specific emphasis and analysis is placed on those projects within the states of Texas and Wyoming. Of note, information used to prepare this paper was obtained from public sources that included company web sites, the US Securities and Exchange Commission, the US Nuclear Regulatory Commission (“NRC”), the US Energy Information Agency (“EIA”), and the relevant state regulatory agencies. The renewed interest in the production of natural uranium has been motivated, in part, by the increased sale price of yellowcake beginning around 2003 resulting in numerous new and existing natural resources companies acquiring mineral rights in the United States. Because of the economic favorability in terms of both operating and capital costs of ISR mines versus conventional mines in the US (with its relatively low grade of uranium ore), the model for most companies was to acquire mineral properties that had the potential for being mined using the ISR method. There were, however, exceptions to this model. The Uravan mineral district in southwest Colorado and southeast Utah, where relatively high-grade, shallow uranium deposits have the potential to be mined using underground methods, is one such exception. However, the focus of this paper will be on ISR projects. In Wyoming, which has been the top producer of natural uranium among the 50 states for the past seven years, there is one producing ISR mine (Bill Smith — Highland), one ISR mine on standby (Christensen Ranch), and two ISR uranium projects licensed but not yet built (Gas Hills and North Butte). Cameco Resources is planning to develop two ISR projects in Wyoming that have been licensed but not yet constructed. Additionally, three new uranium companies (Ur-Energy, Uranerz and Uranium One) have filed applications with the federal and

  5. Greater-than-Class C low-level waste characterization. Appendix I: Impact of concentration averaging low-level radioactive waste volume projections

    International Nuclear Information System (INIS)

    Tuite, P.; Tuite, K.; O'Kelley, M.; Ely, P.

    1991-08-01

    This study provides a quantitative framework for bounding unpackaged greater-than-Class C low-level radioactive waste types as a function of concentration averaging. The study defines the three concentration averaging scenarios that lead to base, high, and low volumetric projections; identifies those waste types that could be greater-than-Class C under the high volume, or worst case, concentration averaging scenario; and quantifies the impact of these scenarios on identified waste types relative to the base case scenario. The base volume scenario was assumed to reflect current requirements at the disposal sites as well as the regulatory views. The high volume scenario was assumed to reflect the most conservative criteria as incorporated in some compact host state requirements. The low volume scenario was assumed to reflect the 10 CFR Part 61 criteria as applicable to both shallow land burial facilities and to practices that could be employed to reduce the generation of Class C waste types

  6. Competency model for the project managers of technical projects

    Science.gov (United States)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  7. Final status of the salt repository project waste package program experimental database

    International Nuclear Information System (INIS)

    Thornton, B.M.; Reimus, P.W.

    1988-03-01

    This report describes the final status of the Salt Repository Project Waste Package Program Experimental Database. The data base serves as a clearinghouse for all data collected within the Waste Package Program (WPP) and its predecessor programs at Pacific Northwest Laboratory (PNL). The database was maintained using RS/1 database management software. Documented assurance that the entries in the database were consistent with experimental records was provided by having each experimentalist inspect the entries and signify that they were in agreement with the records. The inspection and signoff were done per PNL technical procedures. Data for which it was impossible to obtain the experimentalist's inspection and signature were segregated from the rest of the database, although they could still be accessed by WPP staff. The WPPED contains two groups of subdirectories. One group contains data taken prior to the installation of quality assurance procedures at PNL. The other group of subdirectories contains data taken under the NQA-1 procedures since their installation in April 1985. As part of closeout activities in the Salt Repository Project, the WPP database has been archived onto magnetic media. The data in the database are available by request on magnetic media or in hardcopy form. 2 refs

  8. Coordinators' experience-self evaluation of project development status

    International Nuclear Information System (INIS)

    Sijali, I.V

    2009-01-01

    Outlines the progress of the project as follows, design cleared ny NLO, PMO and team refined the submitted project design to improve it's quality. Comments and any questions invited deadline 23 may 2008, endorsement of the project by Tuesday 24 June 2008 and project completed

  9. Relative blood volume monitoring during hemodialysis in end stage renal disease patients.

    Science.gov (United States)

    Ion Titapiccolo, Jasmine; Ferrario, Manuela; Garzotto, Francesco; Cruz, Dinna; Moissl, Ulrich; Tetta, Ciro; Ronco, Claudio; Signorini, Maria G; Cerutti, Sergio

    2010-01-01

    A crucial point in the haemodialysis (HD) treatment is the reliable assessment of hydration status. An inadequate removed volume may lead to chronic fluid overload which can lead to hypertension, left ventricular hypertrophy and heart failure. Therefore, the estimation of the hydration state and the management of a well-tolerated water removal is an important challenge. This exploratory study aims at identifying new parameters obtained from continuous Blood Volume Monitoring (BVM) allowing a qualitative evaluation of hydration status for verifying the adequacy of HD setting parameters (e.g UFR, target dry weight). The percentage of blood volume reduction (BVR%) during HD was compared against a gold standard method for hydration status assessment. The slope of the first 30 minute of blood volume reduction (BVR) was proposed as a useful parameter to identify overhydrated patients.

  10. Developing European conservation and mitigation tools for pollination services: approaches of the STEP (Status and Trends of European Pollinators) project

    NARCIS (Netherlands)

    Potts, S.G.; Biesmeijer, J.C.; Bommarco, R.; Felicioli, A.; Fischer, M.; Jokinen, P.; Kleijn, D.; Klein, A.M.; Kunin, W.E.; Neumann, P.; Penev, L.D.; Petanidou, T.; Rasmont, P.; Roberts, S.P.M.; Smith, H.G.; Sorensen, P.B.; Steffan-Dewenter, I.; Vaissiere, B.E.; Vila, M.; Vujic, A.; Woyciechowski, M.; Zobel, M.; Settele, J.; Schweiger, O.

    2011-01-01

    Pollinating insects form a key component of European biodiversity, and provide a vital ecosystem service to crops and wild plants. There is growing evidence of declines in both wild and domesticated pollinators, and parallel declines in plants relying upon them. The STEP project (Status and Trends

  11. Ion projection lithography: November 2000 status and sub-70-nm prospects

    Science.gov (United States)

    Kaesmaier, Rainer; Wolter, Andreas; Loeschner, Hans; Schunck, Stefan

    2000-10-01

    Among all next generation lithography (NGL) options Ion Projection Lithography (IPL) offers the smallest (particle) wavelength of 5x10- 5nm (l00keV Helium ions). Thus, 4x reduction ion-optics has diffraction limits IOS) has been realized and assembled. In parallel to the PDT-IOS effort, at Leica Jena a test bench for a vertical vacuum 300mm-wafer stage has been realized. Operation of magnetic bearing supported stage movement has already been demonstrated. As ASML vacuum compatible optical wafer alignment system, with 3nm(3(sigma) ) precision demonstrated in air, has been integrated to this wafer test bench system recently. Parallel to the IPL tool development, Infineon Technologies Mask House and the Institute for Microelectronics Stuttgart are intensively working on the development of IPL stencil masks with success in producing 150mm and 200mm stencil masks as reported elsewhere. This paper is focused on information about the status of the PDT-IOS tool.

  12. Maternal nutritional status in early pregnancy is associated with body water and plasma volume changes in a pregnancy cohort in rural Bangladesh.

    Science.gov (United States)

    Gernand, Alison D; Christian, Parul; Schulze, Kerry J; Shaikh, Saijuddin; Labrique, Alain B; Shamim, Abu Ahmed; West, Keith P

    2012-06-01

    Plasma volume expansion has been associated with fetal growth. Our objective was to examine the associations between maternal nutritional status in early pregnancy and extracellular water (ECW), total body water (TBW), and percentage plasma volume change across pregnancy. In a subsample of 377 pregnant women participating in a cluster-randomized trial of micronutrient supplementation, hemoglobin, hematocrit, and multi-frequency bioelectrical impedance were measured at ~10, 20, and 32 wk of gestation. In early pregnancy, women were short (mean ± SD, 148.9 ± 5.3 cm) and thin (19.5 ± 2.5 kg/m(2)). In mixed-effects multiple regression models, a 1-unit higher BMI at ~10 wk was associated with higher ECW and TBW (0.27 and 0.66 kg per kg/m(2), respectively; P pregnancy BMI was negatively associated with gains in ECW and TBW (-0.06 and -0.14 kg per kg/m(2), respectively; P pregnancy have lower ECW and TBW in early, mid, and late pregnancy and lower late pregnancy plasma volume expansion, potentially increasing risk of fetal growth restriction.

  13. Current status on advanced aqueous reprocessing process (next) in FaCT project

    International Nuclear Information System (INIS)

    Washiya, Tadahiro; Myochin, Munetaka; Koyama, Tomozo

    2009-01-01

    Japan Atomic Energy Agency (JAEA) launched the Fast Reactor Cycle Technology Development (FaCT) project in cooperation with the Japanese electric utilities in 2006. An integration of the advanced aqueous reprocessing concept and the simplified pelletizing fuel fabrication was selected as the most promising fuel cycle system. In order to accomplish the integration, R and D tasks were launched as FaCT Project in 2006 by Japanese joint team. The New Extraction System for TRU Recovery (NEXT) system is an advanced aqueous reprocessing concept which was based on the well established aqueous reprocessing for LWR spent fuel and newly applied processes such as uranium crystallization and extraction chromatography for MAs recovery. Main task of the NEXT process is to develop the TRU recovery process and equipments with high reliability, criticality safety, high durability and remote maintainability. In the FaCT project, all innovative technologies are planned to be developed within the next decade focusing on the future commercialization of FBR cycle systems. The judgment of the adoption of each innovative technology will be made by 2010 based on the results of R and Ds. The development of each technology is to be completed by around 2015. By the same time, it is scheduled to present the conceptual design of commercial and demonstrative fast reactor cycle facilities. The six items (Disassembling and shearing, Fuel dissolution, Uranium Crystallization, Single cycle co-extraction of U, Pu and Np, MA recovery by extraction chromatography and Waste treatment) have been identified as the issues to be developed corresponding to each process step. Current R and D status and prospects of this system until around 2015 is reported. (author)

  14. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 2: Public Involvement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the public involvement process is the Comment Report which follows in part of this volume on Public Involvement.

  15. Reduced striatal volumes in Parkinson’s disease: a magnetic resonance imaging study

    Directory of Open Access Journals (Sweden)

    Pitcher Toni L

    2012-08-01

    Full Text Available Abstract Background The presence and extent of structural changes in the brain as a consequence of Parkinson’s disease (PD is still poorly understood. Methods High-resolution 3-tesla T1-weighted structural magnetic resonance images in sixty-five PD and 27 age-matched healthy control participants were examined. Putamen, caudate, and intracranial volumes were manually traced in the axial plane of 3D reconstructed images. Striatal nuclei volumes were normalized to intracranial volume for statistical comparison. Disease status was assessed using the Unified Parkinson’s Disease Rating Scale and Hoehn and Yahr scale. Cognitive status was assessed using global status tests and detailed neuropsychological testing. Results Both caudate and putamen volumes were smaller in PD brains compared to controls after adjusting for age and gender. Caudate volumes were reduced by 11% (p = 0.001 and putamen volumes by 8.1% (p = 0.025. PD striatal volumes were not found to be significantly correlated with cognitive or motor decline. Conclusion Small, but significant reductions in the volume of both the caudate and putamen occur in PD brains. These reductions are independent of the effects of age and gender, however the relation of these reductions to the functional loss of dopamine, which is characteristic of PD, remains unclear.

  16. Status of Groundwater Levels and Storage Volume in the Equus Beds Aquifer Near Wichita, Kansas, January 2009

    Science.gov (United States)

    Hansen, Cristi V.

    2009-01-01

    Beginning in the 1940s, the Wichita well field was developed in the Equus Beds aquifer in southwestern Harvey County and northwestern Sedgwick County to supply water to the city of Wichita (Williams and Lohman, 1949). In addition to supplying drinking water to the largest city in Kansas, the other primary use of water from the Equus Beds aquifer is to irrigate crops in this agriculture-dominated part of south-central Kansas (Rich Eubank, Kansas Department of Agriculture, Division of Water Resources, oral commun., 2008). The decline of water levels in the aquifer were noted soon after the development of the Wichita well field began (Williams and Lohman, 1949). As water levels in the aquifer decline, the volume of water stored in the aquifer decreases and less water is available to supply future needs. For many years the U.S. Geological Survey (USGS), in cooperation with the city of Wichita, has monitored these changes in water levels and the resulting changes in storage volume in the Equus Beds aquifer as part of Wichita's effort to effectively manage this resource. In 2007, the city of Wichita began using Phase I of the Equus Beds Aquifer Storage and Recovery (ASR) project for large-scale artificial recharge of the Equus Beds aquifer. The ASR project uses water from the Little Arkansas River - either pumped from the river directly or from wells in the riverbank that obtain their water from the river by induced infiltration - as the source of artificial recharge to the Equus Beds aquifer (City of Wichita, 2009).

  17. Status of the mechanical design of the 650 MHz cavities for Project X

    Energy Technology Data Exchange (ETDEWEB)

    Barbanotti, S.; Grimm, C.; Champion, M.; Foley, M.; Ginsburg, C.M.; Gonin, I.; Peterson, T.; Ristori, L.; Yakovlev, V.; /Fermilab

    2011-03-01

    In the high-energy section of the Project X Linac, acceleration of H{sup -} ions takes place in superconducting cavities operating at 650 MHz. Two families of five-cell elliptical cavities are planned: beta = 0.61 and beta = 0.9. A specific feature of the Project X Linac is low beam loading, and thus, low bandwidth and higher sensitivity to microphonics. Efforts to optimize the mechanical design of the cavities to improve their mechanical stability in response to the helium bath pressure fluctuations will be presented. These efforts take into account constraints such as cost and ease of fabrication. Also discussed will be the overall design status of the cavities and their helium jackets. The proposed design of the 3 GeV Project X superconducting (SC) Linac employs 650 MHz five-cell elliptical cavities to accelerate 1.0 mA of average H-beam current in the 160-3000 MeV energy range. The 650 MHz region of the Linac is divided into two sections with two different geometric phase velocity factors: beta = 0.61 to cover the 160-520 MeV range and beta = 0.9 to cover the 520-3000 MeV range. Approximately 40 beta = 0.61 and 150 beta = 0.9 cavities are currently planned for the project. An R&D program is in progress at FNAL, in collaboration with TJNAF and India, to develop the 650 MHz cavities for the proposed Linac design. This R&D program includes the design and fabrication of several beta = 0.61 and beta = 0.9 single-cell prototypes for evaluation prior to production of the five-cell cavities. FNAL has contracted AES to fabricate the beta = 0.9 prototypes, while TJNAF is building beta = 0.61 prototypes of their own design. In the remainder of this paper we will restrict our discussion to the five-cell beta = 0.9 cavities.

  18. GENII [Generation II]: The Hanford Environmental Radiation Dosimetry Software System: Volume 3, Code maintenance manual: Hanford Environmental Dosimetry Upgrade Project

    International Nuclear Information System (INIS)

    Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

    1988-09-01

    The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). This coupled system of computer codes is intended for analysis of environmental contamination resulting from acute or chronic releases to, or initial contamination of, air, water, or soil, on through the calculation of radiation doses to individuals or populations. GENII is described in three volumes of documentation. This volume is a Code Maintenance Manual for the serious user, including code logic diagrams, global dictionary, worksheets to assist with hand calculations, and listings of the code and its associated data libraries. The first volume describes the theoretical considerations of the system. The second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. 7 figs., 5 tabs

  19. GENII (Generation II): The Hanford Environmental Radiation Dosimetry Software System: Volume 3, Code maintenance manual: Hanford Environmental Dosimetry Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

    1988-09-01

    The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). This coupled system of computer codes is intended for analysis of environmental contamination resulting from acute or chronic releases to, or initial contamination of, air, water, or soil, on through the calculation of radiation doses to individuals or populations. GENII is described in three volumes of documentation. This volume is a Code Maintenance Manual for the serious user, including code logic diagrams, global dictionary, worksheets to assist with hand calculations, and listings of the code and its associated data libraries. The first volume describes the theoretical considerations of the system. The second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. 7 figs., 5 tabs.

  20. The ADVANCE project: Formal evaluation of the targeted deployment. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    The Advanced Driver and Vehicle Advisory Navigation ConcEpt (ADVANCE) was an invehicle advanced traveler information system (ATIS) that operated in the northwest suburbs of Chicago, Illinois. It was designed to provide origin-destination shortest-time route guidance to a vehicle based on (a) an on-board static (fixed) data base of average network link travel times by time of day, combined as available and appropriate with (b) dynamic (real-time) information on traffic conditions provided by radio frequency (RF) communications to and from a traffic information center (TIC). Originally conceived in 1990 as a major project that would have installed 3,000 to 5,000 route guidance units in privately owned vehicles throughout the test area, ADVANCE was restructured in 1995 as a {open_quotes}targeted deployment,{close_quotes} in which approximately 80 vehicles were to be equipped with the guidance units - Mobile Navigation Assistants (MNAs) - to be in full communication with the TIC while driving the ADVANCE test area road system. Volume one consists of the evaluation managers overview report, and several appendices containing test results.

  1. Sandia software guidelines, Volume 4: Configuration management

    Energy Technology Data Exchange (ETDEWEB)

    1992-06-01

    This volume is one in a series of Sandia Software Guidelines for use in producing quality software within Sandia National Laboratories. This volume is based on the IEEE standard and guide for software configuration management. The basic concepts and detailed guidance on implementation of these concepts are discussed for several software project types. Example planning documents for both projects and organizations are included.

  2. Status of Project Management Education in Pakistan

    Science.gov (United States)

    Arain, Faisal Manzoor; Tipu, Syed Awais Ahmad

    2009-01-01

    Emerging contractual delivery systems, collaborative partnerships, new management initiatives, and global product markets require professionals and students to have a broader awareness of construction methods and project management issues. This paper presents the state of the project management education in Pakistan. The analysis is based on…

  3. Clean Coal Technology Programs: Completed Projects (Volume 2)

    Energy Technology Data Exchange (ETDEWEB)

    Assistant Secretary for Fossil Energy

    2003-12-01

    Annual report on the Clean Coal Technology Demonstration Program (CCTDP), Power Plant Improvement Initiative (PPII), and Clean Coal Power Initiative (CCPI). The report addresses the roles of the programs, implementation, funding and costs, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results.

  4. Volume sums of polar Blaschke–Minkowski homomorphisms

    Indian Academy of Sciences (India)

    In this article, we establish Minkowski and Aleksandrov–Fenchel type inequalities for the volume sum of polars of Blaschke–Minkowski homomorphisms. Keywords. Blaschke–Minkowski homomorphism; volume differences; volume sum; projection body operator. 2010 Mathematics Subject Classification. 52A40, 52A30. 1.

  5. Evaluation of nuclear facility decommissioning projects. Status report. Humboldt Bay Power Plant Unit 3, SAFSTOR decommissioning

    International Nuclear Information System (INIS)

    Baumann, B.L.; Haffner, D.R.; Miller, R.L.; Scotti, K.S.

    1986-06-01

    This document explains the purpose of the US Nuclear Regulatory Commission's (NRC) Evaluation of Nuclear Facility Decommissioning Projects (ENFDP) program and summarizes information concerning the decommissioning of the Humboldt Bay Power Plant (HBPP) Unit 3 facility. Preparations to put this facility into a custodial safe storage (SAFSTOR) mode are currently scheduled for completion by June 30, 1986. This report gives the status of activities as of June 1985. A final summary report will be issued after completion of this SAFSTOR decommissioning activity. Information included in this status report has been collected from the facility decommissioning plan, environmental report, and other sources made available by the licensee. This data has been placed in a computerized data base system which permits data manipulation and summarization. A description of the computer reports that can be generated by the decommissioning data system (DDS) for Humboldt Bay and samples of those reports are included in this document

  6. WBP/SIGAME the Brazilian BIG-GT demonstration project actual status and perspectives

    International Nuclear Information System (INIS)

    Carpentier, E.; Silva, A.

    1998-01-01

    Located in the tropics, with the sun shining all year round, and with its vast territory, Brazil may be regarded as having all the basic conditions to develop a modern Biomass for Electricity industry. Those characteristics together with: (a) the necessity of developing new energy resources for electricity production, in the northeast of the country; (b) the results of studies made by various entities, including CHESF; (c) the progress achieved by the BIG-GT technology; (d) the organisation of the Global Environment Facility (GEF); (e) and the support of the Brazilian government, through the Ministry of Science and Technology (MCT), provided the unique opportunity for the implementation of a commercial demonstration of that technology in Brazil. This paper describes the idea, scope, challenges, lessons, and actual status of development of the WBP/SIGAME project. It also highlights some institutional issues, budget figures, and energy prices. (author)

  7. Educational Project Management Instructional System. Module Two. Project Management Basic Principles. Volume I--Lessons 1 to 6. Volume II--Lessons 7 to 12. Volume III--Case Simulation.

    Science.gov (United States)

    Cummings, C. Peter; Cook, Desmond L.

    This module is the second in a self-instructional program designed to train public school personnel in how to manage educational projects. The purpose of this module is to provide current or potential project directors with the basic knowledge, skills, abilities, and sensitivities needed to manage a local educational project. In the areas of…

  8. Current status and future potential for advanced volume reduction technologies

    International Nuclear Information System (INIS)

    Rutland, L.; Naughton, M.D.; Papaiya, N.C.

    1984-01-01

    With escalating costs for disposal of low-level radioactive waste (LLW) from nuclear power plants, and the possibility of unavailability of disposal space, some nuclear power utilities responded by commiting to implementing advanced volume reduction (VR) systems. This paper presents recent experience to implement advanced volume reduction technologies; their performance and typical operating and capital costs. This experience in the light of current economic conditions may enable us to predict the direction that future advanced VR technology commitments is taking

  9. Safety assessment methodologies for near surface disposal facilities. Results of a co-ordinated research project (ISAM). Volume 1: Review and enhancement of safety assessment approaches and tools. Volume 2: Test cases

    International Nuclear Information System (INIS)

    2004-07-01

    the Safety Guide on 'Safety Assessment for Near Surface Disposal of Radioactive Waste' (Safety Standards Series No. WS-G- 1.1). The report of this CRP is presented in two volumes; Volume 1 contains a summary and a complete description of the ISAM project methodology and Volume 2 presents the application of the methodology to three hypothetical test cases

  10. Total volume versus bouts

    DEFF Research Database (Denmark)

    Chinapaw, Mai; Klakk, Heidi; Møller, Niels Christian

    2018-01-01

    BACKGROUND/OBJECTIVES: Examine the prospective relationship of total volume versus bouts of sedentary behaviour (SB) and moderate-to-vigorous physical activity (MVPA) with cardiometabolic risk in children. In addition, the moderating effects of weight status and MVPA were explored. SUBJECTS....../METHODS: Longitudinal study including 454 primary school children (mean age 10.3 years). Total volume and bouts (i.e. ≥10 min consecutive minutes) of MVPA and SB were assessed by accelerometry in Nov 2009/Jan 2010 (T1) and Aug/Oct 2010 (T2). Triglycerides, total cholesterol/HDL cholesterol ratio (TC:HDLC ratio......, with or without mutual adjustments between MVPA and SB. The moderating effects of weight status and MVPA (for SB only) were examined by adding interaction terms. RESULTS: Children engaged daily in about 60 min of total MVPA and 0-15 min/week in MVPA bouts. Mean total sedentary time was around 7 h/day with over 3...

  11. The effects of intracranial volume adjustment approaches on multiple regional MRI volumes in healthy aging and Alzheimer’s disease

    Directory of Open Access Journals (Sweden)

    Olga eVoevodskaya

    2014-10-01

    Full Text Available In neurodegeneration research, normalization of regional volumes by intracranial volume (ICV is important to estimate the extent of disease-driven atrophy. There is little agreement as to whether raw volumes, volume-to-ICV fractions or regional volumes from which the ICV factor has been regressed out should be used for volumetric brain imaging studies. Using multiple regional cortical and subcortical volumetric measures generated by Freesurfer (51 in total, the main aim of this study was to elucidate the implications of these adjustment approaches. Magnetic resonance imaging (MRI data were analyzed from two large cohorts, the population-based PIVUS cohort (N=406, all subjects age 75 and the Alzheimer disease Neuroimaging Initiative (ADNI cohort (N=724. Further, we studied whether the chosen ICV normalization approach influenced the relationship between hippocampus and cognition in the three diagnostic groups of the ADNI cohort (Alzheimer’s disease, mild cognitive impairment and healthy individuals. The ability of raw vs adjusted hippocampal volumes to predict diagnostic status was also assessed. In both cohorts raw volumes correlate positively with ICV, but do not scale directly proportionally with it. The correlation direction is reversed for all volume-to-ICV fractions, except the lateral and third ventricles. Most grey matter fractions are larger in females, while lateral ventricle fractions are greater in males. Residual correction effectively eliminated the correlation between the regional volumes and ICV and removed gender differences. The association between hippocampal volumes and cognition was not altered by ICV normalization. Comparing prediction of diagnostic status using the different approaches, small but significant differences were found. The choice of normalization approach should be carefully considered when designing a volumetric brain imaging study.

  12. Project management. A discipline which contributes to project success

    International Nuclear Information System (INIS)

    Hoch, G.

    2008-01-01

    The presentation covers the following topics: description of the Project - a contract was signed between KNPP and European Consortium Kozloduy (ECK) consisting of Framatome ANP GmbH as Leader (63%), Framatome ANP S.A.S. (17%), Atomenergoexport (20%) ; Project management in the modernization of NPP Kozloduy units 5 and 6; Project management process within AREVA NP GmbH; current status

  13. Overview of ITER project. Objective, history, status of development, structure and its future

    International Nuclear Information System (INIS)

    Matsuda, S.

    2003-01-01

    The objective of ITER Project is to demonstrate the scientific and technological feasibility of fusion energy for peaceful use. To achieve this goal, the Conceptual Design Activities (CDA 1988-1990) and the Engineering Design Activities (EDA 1992-2001) were conducted by the joint effort of EU, Japan, RF and US under the auspices of IAEA. Engineering design has been developed consistently with plasma physics databases obtained by the world-wide magnetic fusion devices up to and during the EDA. Technology R and D including development, manufacturing and testing of scalable models of major components have been also conducted and ensured manufacturing and technical feasibility of ITER. Such technical readiness to start ITER construction urged formal government negotiation initially by Canada, EU, Japan and RF, and intense meetings have been held since November 2001. The US and China have joined since Feb. 2003. Four candidate sites have been proposed by Canada, EU and Japan for construction and have been evaluated. Once the agreement will be made, the construction takes about 10 years to complete, followed by the operation and exploitation phase lasting about 20 years. This paper gives an overview of ITER Project including its role in the long range fusion program, history, status of development, collaboration structure and its future program. (author)

  14. Fluid Status in Peritoneal Dialysis Patients: The European Body Composition Monitoring (EuroBCM) Study Cohort

    Science.gov (United States)

    Van Biesen, Wim; Williams, John D.; Covic, Adrian C.; Fan, Stanley; Claes, Kathleen; Lichodziejewska-Niemierko, Monika; Verger, Christian; Steiger, Jurg; Schoder, Volker; Wabel, Peter; Gauly, Adelheid; Himmele, Rainer

    2011-01-01

    Background Euvolemia is an important adequacy parameter in peritoneal dialysis (PD) patients. However, accurate tools to evaluate volume status in clinical practice and data on volume status in PD patients as compared to healthy population, and the associated factors, have not been available so far. Methods We used a bio-impedance spectroscopy device, the Body Composition Monitor (BCM) to assess volume status in a cross-sectional cohort of prevalent PD patients in different European countries. The results were compared to an age and gender matched healthy population. Results Only 40% out of 639 patients from 28 centres in 6 countries were normovolemic. Severe fluid overload was present in 25.2%. There was a wide scatter in the relation between blood pressure and volume status. In a multivariate analysis in the subgroup of patients from countries with unrestricted availability of all PD modalities and fluid types, older age, male gender, lower serum albumin, lower BMI, diabetes, higher systolic blood pressure, and use of at least one exchange per day with the highest hypertonic glucose were associated with higher relative tissue hydration. Neither urinary output nor ultrafiltration, PD fluid type or PD modality were retained in the model (total R2 of the model = 0.57). Conclusions The EuroBCM study demonstrates some interesting issues regarding volume status in PD. As in HD patients, hypervolemia is a frequent condition in PD patients and blood pressure can be a misleading clinical tool to evaluate volume status. To monitor fluid balance, not only fluid output but also dietary input should be considered. Close monitoring of volume status, a correct dialysis prescription adapted to the needs of the patient and dietary measures seem to be warranted to avoid hypervolemia. PMID:21390320

  15. TA 55 Reinvestment Project II Phase C Update Project Status May 23, 2017

    Energy Technology Data Exchange (ETDEWEB)

    Giordano, Anthony P. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-05-25

    The TA-55 Reinvestment Project (TRP) II Phase C is a critical infrastructure project focused on improving safety and reliability of the Los Alamos National Laboratory (LANL) TA-55 Complex. The Project recapitalizes and revitalizes aging and obsolete facility and safety systems providing a sustainable nuclear facility for National Security Missions.

  16. Acid-base and electrolyte status during normovolemic hemodilution with succinylated gelatin or HES-containing volume replacement solutions in rats.

    Directory of Open Access Journals (Sweden)

    Johanna K Teloh

    Full Text Available BACKGROUND: In the past, several studies have compared different colloidal replacement solutions, whereby the focus was usually on the respective colloid. We therefore systematically studied the influence of the carrier solution's composition of five approved colloidal volume replacement solutions (Gelafundin, Gelafusal, Geloplasma, Voluven and Volulyte on acid-base as well as electrolyte status during and following acute severe normovolemic hemodilution. The solutions differed in the colloid used (succinylated gelatin vs. HES and in the presence and concentration of metabolizable anions as well as in their electrolyte composition. METHODS: Anesthetized Wistar rats were subjected to a stepwise normovolemic hemodilution with one of the solutions until a final hematocrit of 10%. Subsequent to dilution (162 min, animals were observed for an additional period (150 min. During dilution and observation time blood gas analyses were performed eight times in total. Additionally, in the Voluven and Volulyte groups as well as in 6 Gelafundin animals, electrolyte concentrations, glucose, pH and succinylated gelatin were measured in urine and histopathological evaluation of the kidney was performed. RESULTS: All animals survived without any indications of injury. Although the employed solutions differed in their respective composition, comparable results in all plasma acid-base and electrolyte parameters studied were obtained. Plasma pH increased from approximately 7.28 to 7.39, the plasma K(+ concentration decreased from circa 5.20 mM to 4.80-3.90 mM and the plasma Cl(- concentration rose from approximately 105 mM to 111-120 mM. Urinary analysis revealed increased excretion of K(+, H(+ and Cl(-. CONCLUSIONS: The present data suggest that the carrier solution's composition with regard to metabolizable anions as well as K(+, Ca(2+ only has a minor impact on acid-base and electrolyte status after application of succinylated gelatin or HES-containing colloidal

  17. Status of Standardization Projects

    Science.gov (United States)

    1993-12-31

    A5 B 942 943 943 ASM SA 69 D, 8115 056; ASTM D 5118 FABRICATION OF FIBERBOARD SM AS B 941 943 943 A SM SA 69 Di- N 8115 0562 ASTM D 5168 FAB AND...DR&E(AR)759 STANDARDIZATION PROJECTS REPORT - 1ST QTR FY 1994 PREPARING ACTIVITY LISTING PA AAPAA p BPP .A- G/ASA NC AC 21 RC G CSOL- Qý yqFyýFT7RL AL...941 943 943 A SM SA 69 DH N 8115 0562 ASTM D 5168 FAB AND CLOSURE TRIPLE WALL SM AS B 941 943 943 A SM SA 69 DH N 8125 0379 V’L-B-61000 BOTTLES

  18. Status of the CLIO project

    International Nuclear Information System (INIS)

    Miyoki, S; Uchiyama, T; Yamamoto, K

    2004-01-01

    The CLIO project involves the Cryogenic Laser Interferometer Observatory (CLIO) detector complex for gravitational wave detection and the Kamioka Laser Interferometric Strainmeter for the acquisition of geophysical data. CLIO has been constructed to demonstrate the feasibility of a future project, the Large-scale Cryogenic Gravitational wave Telescope (LCGT). It will utilize the low seismic and stable environment of the Kamioka mine as well as sapphire mirrors and suspension fibres at low temperature to reduce thermal noise. We designed CLIO to have a noise level limited by the thermal noise of sapphire mirrors and sapphire suspension fibres, which vary from 3 x 10 -19 m Hz -1/2 at 300 K to 2 x 10 -20 m Hz -1/2 at 20 K around 100 Hz. The strainmeter has already succeeded in monitoring the Earth's tidal motion with a strain sensitivity of 2 x 10 -12 . The seismic noise veto between these same-scale interferometers is expected to provide an effective means of data selection for the gravitational wave signal analysis, and the ground motion data obtained by the strainmeter will help to maintain the stable operation of CLIO

  19. Technical realization of the VISA-2 Project, contract: 2.01/ I phase, Volume No. I

    International Nuclear Information System (INIS)

    1963-12-01

    Cooperation between the Institutes in Vinca and Saclay has started by carrying out the task 'Technical realization of the VISA-2 project' which should enable: obtaining new experimental spaces in the RA reactor with high fast neutron flux for sample irradiation; obtaining experience in reactor continual operation for few months at nominal power of 6.5 MW and increase of RA reactor utilization; solving the problem of activated channels and samples transport, problems of working in hot cells; obtaining irradiated samples for examining radiation effects first in Saclay and later in Vinca. The project is divided in three phases. Phase one covers the reconstruction of the RA reactor fuel channels according to the VISA-2 project demands. The second phase includes the activities related to measuring devices for measuring the temperatures at the incoming and outgoing heavy water in 5 VISA-2 channels, as well as temperature of the samples (55 thermocouples) and testing the channels and capsules after their insertion in the reactor. The third phase includes activities are related to problems of transport of radioactive channels and VISA-2 capsules, problems of cutting as well as packing and transporting of irradiated samples from Vinca to Saclay. This volume includes all the relevant documents for completing the task including contracts, needed preliminary calculations as well as safety analysis [sr

  20. Prototypical Rod Construction Demonstration Project. Phase 3, Final report: Volume 1, Cold checkout test report, Book 3

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 3 discusses the following topics: Downender Test Results and Analysis Report; NFBC Canister Upender Test Results and Analysis Report; Fuel Assembly Handling Fixture Test Results and Analysis Report; and Fuel Canister Upender Test Results and Analysis Report.

  1. The MEarth Project: Status Update and the Commissioning of a Brand New Telescope Array in the Southern Hemisphere

    Science.gov (United States)

    Berta-Thompson, Zachory K.; Irwin, Jonathan; Charbonneau, David; Newton, Elisabeth R.; Dittmann, Jason

    2014-06-01

    The MEarth Project is an ongoing all-sky survey for Earth-like planets transiting the closest, smallest M dwarfs. MEarth aims to find good targets for atmospheric characterization with JWST and the next generation of enormous ground-based telescopes. MEarth's yearly data releases, containing precise light curves of nearby mid-to-late M dwarfs, provide a unique window into the photometric variability of the stars that will forever be among the most interesting targets in the search for potentially habitable exoplanets. We present a status update on the MEarth Project, including a detailed map of the progress we’ve made so far with 8 telescopes in the Northern hemisphere and promising early results from our new installation of 8 more telescopes in the Southern hemisphere.

  2. Validation of a 4D-PET Maximum Intensity Projection for Delineation of an Internal Target Volume

    International Nuclear Information System (INIS)

    Callahan, Jason; Kron, Tomas; Schneider-Kolsky, Michal; Dunn, Leon; Thompson, Mick; Siva, Shankar; Aarons, Yolanda; Binns, David; Hicks, Rodney J.

    2013-01-01

    Purpose: The delineation of internal target volumes (ITVs) in radiation therapy of lung tumors is currently performed by use of either free-breathing (FB) 18 F-fluorodeoxyglucose-positron emission tomography-computed tomography (FDG-PET/CT) or 4-dimensional (4D)-CT maximum intensity projection (MIP). In this report we validate the use of 4D-PET-MIP for the delineation of target volumes in both a phantom and in patients. Methods and Materials: A phantom with 3 hollow spheres was prepared surrounded by air then water. The spheres and water background were filled with a mixture of 18 F and radiographic contrast medium. A 4D-PET/CT scan was performed of the phantom while moving in 4 different breathing patterns using a programmable motion device. Nine patients with an FDG-avid lung tumor who underwent FB and 4D-PET/CT and >5 mm of tumor motion were included for analysis. The 3 spheres and patient lesions were contoured by 2 contouring methods (40% of maximum and PET edge) on the FB-PET, FB-CT, 4D-PET, 4D-PET-MIP, and 4D-CT-MIP. The concordance between the different contoured volumes was calculated using a Dice coefficient (DC). The difference in lung tumor volumes between FB-PET and 4D-PET volumes was also measured. Results: The average DC in the phantom using 40% and PET edge, respectively, was lowest for FB-PET/CT (DCAir = 0.72/0.67, DCBackground 0.63/0.62) and highest for 4D-PET/CT-MIP (DCAir = 0.84/0.83, DCBackground = 0.78/0.73). The average DC in the 9 patients using 40% and PET edge, respectively, was also lowest for FB-PET/CT (DC = 0.45/0.44) and highest for 4D-PET/CT-MIP (DC = 0.72/0.73). In the 9 lesions, the target volumes of the FB-PET using 40% and PET edge, respectively, were on average 40% and 45% smaller than the 4D-PET-MIP. Conclusion: A 4D-PET-MIP produces volumes with the highest concordance with 4D-CT-MIP across multiple breathing patterns and lesion sizes in both a phantom and among patients. Freebreathing PET/CT consistently underestimates ITV

  3. Validation of a 4D-PET Maximum Intensity Projection for Delineation of an Internal Target Volume

    Energy Technology Data Exchange (ETDEWEB)

    Callahan, Jason, E-mail: jason.callahan@petermac.org [Centre for Molecular Imaging, Peter MacCallum Cancer Centre, East Melbourne, Victoria (Australia); Kron, Tomas [Department of Physical Sciences, Peter MacCallum Cancer Centre, East Melbourne, Victoria (Australia); Peter MacCallum Department of Oncology, The University of Melbourne, Melbourne (Australia); Schneider-Kolsky, Michal [Department of Medical Imaging and Radiation Science, Monash University, Clayton, Victoria (Australia); Dunn, Leon [Department of Applied Physics, RMIT University, Melbourne (Australia); Thompson, Mick [Centre for Molecular Imaging, Peter MacCallum Cancer Centre, East Melbourne, Victoria (Australia); Siva, Shankar [Department of Radiation Oncology, Peter MacCallum Cancer Centre, East Melbourne, Victoria (Australia); Aarons, Yolanda [Department of Radiation Oncology, Peter MacCallum Cancer Centre, East Melbourne, Victoria (Australia); Peter MacCallum Department of Oncology, The University of Melbourne, Melbourne (Australia); Binns, David [Centre for Molecular Imaging, Peter MacCallum Cancer Centre, East Melbourne, Victoria (Australia); Hicks, Rodney J. [Centre for Molecular Imaging, Peter MacCallum Cancer Centre, East Melbourne, Victoria (Australia); Peter MacCallum Department of Oncology, The University of Melbourne, Melbourne (Australia)

    2013-07-15

    Purpose: The delineation of internal target volumes (ITVs) in radiation therapy of lung tumors is currently performed by use of either free-breathing (FB) {sup 18}F-fluorodeoxyglucose-positron emission tomography-computed tomography (FDG-PET/CT) or 4-dimensional (4D)-CT maximum intensity projection (MIP). In this report we validate the use of 4D-PET-MIP for the delineation of target volumes in both a phantom and in patients. Methods and Materials: A phantom with 3 hollow spheres was prepared surrounded by air then water. The spheres and water background were filled with a mixture of {sup 18}F and radiographic contrast medium. A 4D-PET/CT scan was performed of the phantom while moving in 4 different breathing patterns using a programmable motion device. Nine patients with an FDG-avid lung tumor who underwent FB and 4D-PET/CT and >5 mm of tumor motion were included for analysis. The 3 spheres and patient lesions were contoured by 2 contouring methods (40% of maximum and PET edge) on the FB-PET, FB-CT, 4D-PET, 4D-PET-MIP, and 4D-CT-MIP. The concordance between the different contoured volumes was calculated using a Dice coefficient (DC). The difference in lung tumor volumes between FB-PET and 4D-PET volumes was also measured. Results: The average DC in the phantom using 40% and PET edge, respectively, was lowest for FB-PET/CT (DCAir = 0.72/0.67, DCBackground 0.63/0.62) and highest for 4D-PET/CT-MIP (DCAir = 0.84/0.83, DCBackground = 0.78/0.73). The average DC in the 9 patients using 40% and PET edge, respectively, was also lowest for FB-PET/CT (DC = 0.45/0.44) and highest for 4D-PET/CT-MIP (DC = 0.72/0.73). In the 9 lesions, the target volumes of the FB-PET using 40% and PET edge, respectively, were on average 40% and 45% smaller than the 4D-PET-MIP. Conclusion: A 4D-PET-MIP produces volumes with the highest concordance with 4D-CT-MIP across multiple breathing patterns and lesion sizes in both a phantom and among patients. Freebreathing PET/CT consistently

  4. Present status of the EPFL (Swiss) fusion-fission experiment 'LOTUS'

    International Nuclear Information System (INIS)

    Haldy, P.A.; Frueh, R.; Ligou, J.; Schneeberger, J.P.; Kumar, A.

    1984-01-01

    The present status of the LOTUS project - a fusion-fission hybrid research facility under construction at the Ecole Polytechnique Federale de Lausanne (EPFL) Switzerland - is presented. Emphasis is places on the description of the facility and on the design studies of an initial blanket of the ''fission-suppressed'' type. The LOTUS facility consists of a parallelepiped-shaped blanket, occupying roughly a volume of 1 m 3 , driven by a sealed 14 MeV (D,T) neutron generator with a rated source strength of 5x10 12 n/s. The experiment is housed in a massive concrete shielding of 220 cm thick walls, which leaves an experimental test chamber of 360 cm by 240 cm lateral dimensions and a height of 300 cm. (orig.) [de

  5. General concept and present status of the AMS - project

    International Nuclear Information System (INIS)

    Stan-Sion, C.; Plostinaru, D.; Catana, L.; Radulescu, M.; Marinescu, L.; Dima, R.

    1998-01-01

    The Institute of Nuclear Physics and Engineering, IFIN-HH, Bucharest started in 1996 the Construction Project for an AMS facility in Bucharest. The Project is supported by the German-Romanian scientific cooperation project RUM-013-97. In the frame of this project, scientific research, construction activities of electronic and mechanical devices and activities for calibration and optimization were performed. The activities in this year are concentrated on experimental tests and optimization of the AMS analysis procedure and on improving the tandem acceleration and transmission capability. These are as follows: - construction and tests of a high current sputter source, with spherical ionizer and automatic many-sample changer. Experimental tests and measurements of emittance and beam profile; - construction of the Injector Platform; - construction and tests of a Bragg - charged particle detector; - calibration and optimization experiments of the AMS ensemble. The AMS facility is based on the 8 MV - FN tandem accelerator and has the following main components: the AMS ion injector, a Wien - velocity filter, a 60 angle bending magnet and the particle detection system. For heavy particle detection we constructed a Bragg ionization chamber. This should be used for standard AMS measurements. A specific part of the AMS facility represents the AMS injector deck. The main components are: the high current sputter source, the analyzing double focusing magnet, two optical systems, a four-slit beam defining system in front of the analyzing magnet and a four-slit aperture with remote controlled Faraday cup (for beam current integration of stable isotopes) after the magnet. Finally, the pre-acceleration tube (40 kV) connects the ensemble to the ground potential of the accelerator beam line. For AMS measurements, the sputter ion source is able to provide both high beam current and small beam emittance. These characteristics are necessary in order to achieve high analyzing

  6. Selected topics in particle accelerators: Proceedings of the CAP meetings. Volume 5

    International Nuclear Information System (INIS)

    Parsa, Z.

    1995-01-01

    This Report includes copies of transparencies and notes from the presentations made at the Center for Accelerator Physics at Brookhaven National Laboratory Editing and changes to the authors' contributions in this Report were made only to fulfill the publication requirements. This volume includes notes and transparencies on nine presentations: ''The Energy Exchange and Efficiency Consideration in Klystrons'', ''Some Properties of Microwave RF Sources for Future Colliders + Overview of Microwave Generation Activity at the University of Maryland'', ''Field Quality Improvements in Superconducting Magnets for RHIC'', ''Hadronic B-Physics'', ''Spiking Pulses from Free Electron Lasers: Observations and Computational Models'', ''Crystalline Beams in Circular Accelerators'', ''Accumulator Ring for AGS ampersand Recent AGS Performance'', ''RHIC Project Machine Status'', and ''Gamma-Gamma Colliders.''

  7. Alligator Rivers Analogue project. Hydrogeological modelling. Final Report - Volume 6

    International Nuclear Information System (INIS)

    Townley, L.R.; Trefry, M.G.; Barr, A.D.; Braumiller, S.

    1992-01-01

    This volume describes hydrogeological modelling carried out as part of the Alligator Rivers Analogue Project. Hydrogeology has played a key integrating role in the Project, largely because water movement is believed to have controlled the evolution of the Koongarra uranium Orebody and therefore affects field observations of all types at all scales. Aquifer testing described uses the concept of transmissivity in its interpretation of aquifer response to pumping. The concept of an aquifer, a layer transmitting significant quantities of water in a mainly horizontal direction, seems hard to accept in an environment as heterogeneous as that at Koongarra. But modelling of aquifers both in one dimension and two dimensionally in plan has contributed significantly to our understanding of the site. A one-dimensional model with three layers (often described as a quasi two dimensional model) was applied to flow between the Fault and Koongarra Creek. Being a transient model, this model was able to show that reverse flows can indeed occur back towards the Fault, but only if there is distributed recharge over the orebody as well as a mechanism for the Fault, or a region near the Fault, to remove water from the simulated cross-section. The model also showed clearly that the response of the three-layered system, consisting of a highly weathered zone, a fractured transmissive zone and a less conductive lower schist zone, is governed mainly by the transmissivity and storage coefficient of the middle layer. The storage coefficient of the higher layer has little effect. A two-dimensional model in plan used a description of anisotropy to show that reverse flows can also occur even without a conducting Fault. Modelling of a three-dimensional region using discrete fractures showed that it is certainly possible to simulate systems like that observed at Koongarra, but that large amounts of data are probably needed to obtain realistic descriptions of the fracture networks. Inverse modelling

  8. Alligator Rivers Analogue project. Hydrogeological modelling. Final Report - Volume 6

    Energy Technology Data Exchange (ETDEWEB)

    Townley, L R; Trefry, M G; Barr, A D [CSIRO Div of Water Resources, PO Wembley, WA (Australia); Braumiller, S [Univ of Arizona, Tucson, AZ (United States). Dept of Hydrology and Water Resources; Kawanishi, M [Central Research Institute of Electric Power Industry, Abiko-Shi, Chiba-Ken (Japan); and others

    1993-12-31

    This volume describes hydrogeological modelling carried out as part of the Alligator Rivers Analogue Project. Hydrogeology has played a key integrating role in the Project, largely because water movement is believed to have controlled the evolution of the Koongarra uranium Orebody and therefore affects field observations of all types at all scales. Aquifer testing described uses the concept of transmissivity in its interpretation of aquifer response to pumping. The concept of an aquifer, a layer transmitting significant quantities of water in a mainly horizontal direction, seems hard to accept in an environment as heterogeneous as that at Koongarra. But modelling of aquifers both in one dimension and two dimensionally in plan has contributed significantly to our understanding of the site. A one-dimensional model with three layers (often described as a quasi two dimensional model) was applied to flow between the Fault and Koongarra Creek. Being a transient model, this model was able to show that reverse flows can indeed occur back towards the Fault, but only if there is distributed recharge over the orebody as well as a mechanism for the Fault, or a region near the Fault, to remove water from the simulated cross-section. The model also showed clearly that the response of the three-layered system, consisting of a highly weathered zone, a fractured transmissive zone and a less conductive lower schist zone, is governed mainly by the transmissivity and storage coefficient of the middle layer. The storage coefficient of the higher layer has little effect. A two-dimensional model in plan used a description of anisotropy to show that reverse flows can also occur even without a conducting Fault. Modelling of a three-dimensional region using discrete fractures showed that it is certainly possible to simulate systems like that observed at Koongarra, but that large amounts of data are probably needed to obtain realistic descriptions of the fracture networks. Inverse modelling

  9. Motivation, description, and summary status of geomechanical and geochemical modeling studies in Task D of the International DECOVALEX-THMC Project

    International Nuclear Information System (INIS)

    Birkholzer, J.T.; Barr, D.; Rutqvist, J.; Sonnenthal, E.

    2005-01-01

    The DECOVALEX project is an international cooperative project initiated by SKI, the Swedish Nuclear Power Inspectorate, with participation of about 10 international organizations. The general goal of this project is to encourage multidisciplinary interactive and cooperative research on modeling coupled thermo-hydro-mechanical-chemical (THMC) processes in geologic formations in support of the performance assessment for underground storage of radioactive waste. One of the research tasks, initiated in 2004 by the U.S. Department of Energy (DOE), addresses the long-term impact of geomechanical and geochemical processes on the flow conditions near waste emplacement tunnels. Within this task, four international research teams conduct predictive analysis of the coupled processes in two generic repositories, using multiple approaches and different computer codes. Below, we give an overview of the research task and report its current status

  10. IRIS project update: status of the design and licensing activities

    International Nuclear Information System (INIS)

    Petrovic, B.; Carelli, M.

    2004-01-01

    This paper presents an overview of the current status of the IRIS (International Reactor Innovative and Secure) project, focusing on the design and licensing activities. An update relative to the previous presentation at the 4th HND Conference is provided, highlighting some of the main accomplishments over the past two years. After successfully completing the conceptual design phase, IRIS is now finalizing the preliminary design as well. The pre-application licensing review with the U.S. NRC has been initiated in October of 2002. The safety-by-design approach and PRA-guided design open the possibility to aim for licensing not requiring off-site emergency response planning. Multiple single-unit and twin-unit site layouts have been developed within the ESP (Early Site Permit) program currently pursued by three U.S. power utilities. Desalination and district heating options have recently been added to the base design. Staggered construction schedules of multiple units may be applied to optimize cash-flow and minimize the required investment, making IRIS a financially attractive option, even for economies with limited investment capabilities. Because of its modularity, compatibility with smaller/medium grids, and enabling gradual build of new generating capacity matching the needs, IRIS has a large potential in the worldwide market.(author)

  11. Project 'European Research Center for Air Pollution Abatement Measures'

    International Nuclear Information System (INIS)

    1985-04-01

    During the 5-7th of March 1985 the first status report of the project 'European Research Center for Air Pollution Control Measures' took place in the Nuclear Research Center, Karlsruhe. Progress reports on the following topics assessment and analysis of the impacts of airborne pollutants on forest trees; distinction from other potential causes of recent forest dieback, research into atmospheric dispersion, conversion and deposition of airborne pollutants, development and optimization of industrial-technical processes to reduce or avoid emissions and providing instruments and making recommendations to the industrial and political sectors were presented. This volume is a collection of the work reported there. 42 papers were entered separately. (orig./MG) [de

  12. Present Status of the JENDL Project (May, 2013). WPEC Meeting, Paris, France, 23-24 May, 2013

    International Nuclear Information System (INIS)

    Fukahori, Tokio; Iwamoto, Osamu; Ishikawa, Makoto

    2013-01-01

    This paper briefly presents the present status of the Japanese JENDL Project: organization of Japanese Nuclear Data Committee (JNDC), a research committee for JAEA research activities; Nuclear Data Evaluation (JENDL-4.0 Updated Files and JENDL-4.0 Plus, benchmarking for fission reactor applications (criticality for thermal systems, adjusted library for fast systems), new evaluations, covariances, evaluation tools, fission products decay data file); other activities such as the 2012 Symposium on Nuclear Data at Kyoto University Research Reactor Institute, the initiation of conversation on Covariance Data with users, the celebration of the Golden Jubilee (since 1963) of JNDC

  13. Investment alternative: the status quo or PACS?

    Science.gov (United States)

    Vanden Brink, John A.; Cywinski, Jozef K.

    1990-08-01

    While the cost of Picture Archiving and Communication Systems (PACS) can be substantial, the cost of continuing with present manual methods may become prohibitive in growing departments as the need for additional space and personnel (both technical and professional) to meet the increasing requirements for all image management activities continues to grow. This will occur simultaneously with increasing pressures on problems of the present system, i.e., lost films, lost revenues, delayed reporting and longer diagnostic cycle times. Present methods of image archiving communication and management i.e. the relationship of procedure volume to VFE requirements for professional and technical personnel, costs of film, film storage space, and other performance factors are analyzed based on the database created by the Technology Marketing Group (TMG) computerized cost analysis model applied to over 50 US hospitals. Also, the model is used to provide the projected cost of present methods of film management for an average US 400 +bed hospital based on ten year growth rate assumptions. TMG PACS Tracking data provides confirmation of staffmg pattern correlation to procedure volume. The data presented in the paper provides a basis for comparing the investment in maintaining the status quo to an investment in PACS.

  14. ASEAN-USAID Buildings Energy Conservation Project. Final report, Volume 3: Audits

    Energy Technology Data Exchange (ETDEWEB)

    Loewen, J.M.; Levine, M.D.; Busch, J.F. [eds.

    1992-06-01

    The auditing subproject of the ASEAN-USAID Buildings Energy Conservation Project has generated a great deal of auditing activity throughout the ASEAN region. Basic building characterisfic and energy consumption data were gathered for over 200 buildings and are presented in this volume. A large number of buildings were given more detailed audits and were modeled with either the ASEAM-2 computer program or the more complex DOE-2 program. These models were used to calculate the savings to be generated by conservabon measures. Specially audits were also conducted, including lighting and thermal comfort surveys. Many researchers in the ASEAN region were trained to perform energy audits in a series of training courses and seminars. The electricity intensifies of various types of ASEAN buildings have been calculated. A comparison to the electricity intensity of the US building stock tentatively concludes that ASEAN office buildings are comparable, first class hotels and retail stores are more ewctricity intensive than their US counterparts, and hospitals are less intensive. Philippine and Singapore lighting surveys indicate that illuminance levels in offices tend to be below the minimum accepted standard. Computer simulations of the energy use in various building types generally agree that for most ASEAN buildings, electricity consumption for air-conditioning (including fan power) consumes approximately 60% of total building electricity. A review of the many studies made during the Project to calculate the savings from energy conservation opportunities (ECOS) shows a median potential savings of approximately 10%, with some buildings saving as much as 50%. Singapore buildings, apparently as a result of previously implemented efficient energy-use practices, shows a lower potential for savings than the other ASEAN nations. Air-conditioning ECOs hold the greatest potential for savings.

  15. [Evaluation of the socioeconomic status in epidemiological surveys: hypotheses of research in the Brianza area MONICA project].

    Science.gov (United States)

    Cesana, G C; Ferrario, M; De Vito, G; Sega, R; Grieco, A

    1995-01-01

    Socio-economic status (SES) has been reported as a causative factor of increasing health inequalities in industrialized countries. The phenomenon has been particularly investigated for job related diseases, including cardiovascular disease and risk. The group of occupational medicine specialists in the world wide MONItoring program of CARdiovascular disease (WHO-MONICA Project) is now producing a number of hypotheses about the application of internationally defined criteria and tools for SES evaluation in the Italian area of the Project, Area Brianza. After a short review of some main conceptual and methodological problems, a proposal is presented of an SES index, derived from the pooled data of two population surveys carried out in this area. From a randomized sample of 3200 residents, 25-64 years old, stratified by sex and age decade, 1731 subjects, 594 females and 1137 males, employed at the time of the screening were extracted. Four variables were considered: age, education, occupational level and job-strain (according to the Karasek-Theorell model) by which each subject was classified in three levels--high, medium, low--of education and occupation, whose combination was used to obtain as many levels of socio-economic status. This a method of building an SES index is based on a sequence of approximations following two essential criteria: limitation of the variables to be surveyed, through standardized procedures; ability to identify the "low" SES category, presumably more at risk for disease.

  16. Is Socio-Economic Status a Determinant of HIV-Related Stigma Attitudes in Zimbabwe? Findings from Project Accept.

    Science.gov (United States)

    Mateveke, Kudzanai; Singh, Basant; Chingono, Alfred; Sibanda, E; Machingura, Ian

    2016-08-17

    HIV related stigma and discrimination is a known barrier for HIV prevention and care. We aimed to assess the relationship between socio-economic status (SES) and HIV related stigma in Zimbabwe. This paper uses data from Project Accept , which examined the impact of community-based voluntary counseling and testing intervention on HIV incidence and stigma. Total of 2522 eligible participants responded to a psychometric assessment tool, which assessed HIV related stigma and discrimination attitudes on 4 point Likert scale. The tool measured three components of HIV-related stigma: shame, blame and social isolation, perceived discrimination, and equity. Participants' ownership of basic assets was used to assess the socio-economic status. Shame, blame and social isolation component of HIV related stigma was found to be significantly associated with medium [odds ratio (OR)=1.73, Pstigma and discrimination programs to be effective, they should take into account the socio-economic context of target population.

  17. Spent nuclear fuel project technical databook

    Energy Technology Data Exchange (ETDEWEB)

    Reilly, M.A.

    1998-07-22

    The Spent Nuclear Fuel (SNF) project technical databook provides project-approved summary tables of selected parameters and derived physical quantities, with nominal design and safety basis values. It contains the parameters necessary for a complete documentation basis of the SNF Project technical and safety baseline. The databook is presented in two volumes. Volume 1 presents K Basins SNF related information. Volume 2 (not yet available) will present selected sludge and water information, as it relates to the sludge and water removal projects. The values, within this databook, shall be used as the foundation for analyses, modeling, assumptions, or other input to SNF project safety analyses or design. All analysis and modeling using a parameter available in this databook are required to use and cite the appropriate associated value, and document any changes to those values (i.e., analysis assumptions, equipment conditions, etc). Characterization and analysis efforts are ongoing to validate, or update these values.

  18. Spent nuclear fuel project technical databook

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1998-01-01

    The Spent Nuclear Fuel (SNF) project technical databook provides project-approved summary tables of selected parameters and derived physical quantities, with nominal design and safety basis values. It contains the parameters necessary for a complete documentation basis of the SNF Project technical and safety baseline. The databook is presented in two volumes. Volume 1 presents K Basins SNF related information. Volume 2 (not yet available) will present selected sludge and water information, as it relates to the sludge and water removal projects. The values, within this databook, shall be used as the foundation for analyses, modeling, assumptions, or other input to SNF project safety analyses or design. All analysis and modeling using a parameter available in this databook are required to use and cite the appropriate associated value, and document any changes to those values (i.e., analysis assumptions, equipment conditions, etc). Characterization and analysis efforts are ongoing to validate, or update these values

  19. We are (all) the champions: The effect of status in the implementation of innovations

    NARCIS (Netherlands)

    B. Szatmari (Balazs)

    2016-01-01

    markdownabstractThis thesis explores the effects of status in the implementation of innovations in three empirical papers which investigate both the positive and negative impact of statusstatus of either the project leader, the project group, or the organization. We argue that every project member

  20. Recovery efficiency test project, Phase 2 activity report. Volume 2, Final report

    Energy Technology Data Exchange (ETDEWEB)

    Overbey, W.K. Jr.; Salamy, S.P.; Locke, C.D.

    1989-02-01

    The Recovery Efficiency Test well project addressed a number of technical issues. The primary objective was to determine the increased efficiency of gas recovery of a long horizontal wellbore over that of a vertical wellbore and, more specifically, what improvements can be expected from inducing multiple hydraulic fractures from such a wellbore. This volume contains appendices for: (1) supporting material and procedures for ``data frac`` stimulation of zone 6 using nitrogen and nitrogen foam; (2) supporting material and procedures for stimulation no. 1 nitrogen gas frac on zone no. 1; (3) supporting material and procedures for stimulation no. 2 in zone no. 1 using liquid CO{sub 2}; (4) supporting material and procedures for frac no. 3 on zone no.1 using nitrogen foam and proppant; (5) supporting material and procedures for stimulation no. 4 in zones 2--3 and 4 using nitrogen foam and proppant; (6) supporting materials and procedures for stimulation no. 5 in zones 5 and 8; and (7) fracture diagnostics reports and supporting materials.

  1. Nuclear power. Volume 2: nuclear power project management

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    The following topics are discussed: review of nuclear power plants; licensing procedures; safety analysis; project professional services; quality assurance and project organization; construction, scheduling and operation; construction, scheduling and operation; nuclear fuel handling and fuel management; and plant cost management. 116 references, 115 figures, 33 tables

  2. Legacy sample disposition project. Volume 2: Final report

    International Nuclear Information System (INIS)

    Gurley, R.N.; Shifty, K.L.

    1998-02-01

    This report describes the legacy sample disposition project at the Idaho Engineering and Environmental Laboratory (INEEL), which assessed Site-wide facilities/areas to locate legacy samples and owner organizations and then characterized and dispositioned these samples. This project resulted from an Idaho Department of Environmental Quality inspection of selected areas of the INEEL in January 1996, which identified some samples at the Test Reactor Area and Idaho Chemical Processing Plant that had not been characterized and dispositioned according to Resource Conservation and Recovery Act (RCRA) requirements. The objective of the project was to manage legacy samples in accordance with all applicable environmental and safety requirements. A systems engineering approach was used throughout the project, which included collecting the legacy sample information and developing a system for amending and retrieving the information. All legacy samples were dispositioned by the end of 1997. Closure of the legacy sample issue was achieved through these actions

  3. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  4. Status of the MCNPtrademark/LCStrademark merger project

    International Nuclear Information System (INIS)

    Hughes, H.G.; Adams, K.J.; Chadwick, M.B.; Comly, J.C.; Frankle, S.C.; Hendricks, J.S.; Little, R.C.; Prael, R.E.; Waters, L.S.; Young, P.G.

    1998-01-01

    The MCNPX code is now in limited release in a beta-test version. We provide a brief status report on the physics modules now in the code and of the enhanced capabilities to use new evaluated neutron data. We also present new benchmark calculations in which LAHET and MCNPX are compared with experimental results from the Japan Atomic Energy Research Institute

  5. User's operating procedures. Volume 1: Scout project information programs

    Science.gov (United States)

    Harris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the Scout Project Automatic Data System, called SPADS is given. SPADS is the result of the past seven years of software development on a Prime minicomputer located at the Scout Project Office. SPADS was developed as a single entry, multiple cross reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. The instructions to operate the Scout Project Information programs in data retrieval and file maintenance via the user friendly menu drivers is presented.

  6. Wind River Watershed Project; 1998 Annual Report; Volume II

    International Nuclear Information System (INIS)

    Connolly, Patrick J.

    1999-01-01

    The authors report here their on-ground restoration actions. Part 1 describes work conducted by the Underwood Conservation District (UCD) on private lands. This work involves the Stabler Cut-Bank project. Part 2 describes work conducted by the U.S. Forest Service. The Stabler Cut-Bank Project is a cooperative stream restoration effort between Bonneville Power Administration (BPA), the UCD, private landowners, the U.S. Forest Service (USFS), and the U.S. Fish and Wildlife Service (USFWS). The Stabler site was identified by UCD during stream surveys conducted in 1996 as part of a USFWS funded project aimed at initiating water quality and habitat restoration efforts on private lands in the basin. In 1997 the Wind River Watershed Council selected the project as a top priority demonstration project. The landowners were approached by the UCD and a partnership developed. Due to their expertise in channel rehabilitation, the Forest Service was consulted for the design and assisted with the implementation of the project. A portion of the initial phase of the project was funded by USFWS. However, the majority of funding (approximately 80%) has been provided by BPA and it is anticipated that additional work that is planned for the site will be conducted with BPA funds

  7. Estimation of error in maximal intensity projection-based internal target volume of lung tumors: a simulation and comparison study using dynamic magnetic resonance imaging.

    Science.gov (United States)

    Cai, Jing; Read, Paul W; Baisden, Joseph M; Larner, James M; Benedict, Stanley H; Sheng, Ke

    2007-11-01

    To evaluate the error in four-dimensional computed tomography (4D-CT) maximal intensity projection (MIP)-based lung tumor internal target volume determination using a simulation method based on dynamic magnetic resonance imaging (dMRI). Eight healthy volunteers and six lung tumor patients underwent a 5-min MRI scan in the sagittal plane to acquire dynamic images of lung motion. A MATLAB program was written to generate re-sorted dMRI using 4D-CT acquisition methods (RedCAM) by segmenting and rebinning the MRI scans. The maximal intensity projection images were generated from RedCAM and dMRI, and the errors in the MIP-based internal target area (ITA) from RedCAM (epsilon), compared with those from dMRI, were determined and correlated with the subjects' respiratory variability (nu). Maximal intensity projection-based ITAs from RedCAM were comparatively smaller than those from dMRI in both phantom studies (epsilon = -21.64% +/- 8.23%) and lung tumor patient studies (epsilon = -20.31% +/- 11.36%). The errors in MIP-based ITA from RedCAM correlated linearly (epsilon = -5.13nu - 6.71, r(2) = 0.76) with the subjects' respiratory variability. Because of the low temporal resolution and retrospective re-sorting, 4D-CT might not accurately depict the excursion of a moving tumor. Using a 4D-CT MIP image to define the internal target volume might therefore cause underdosing and an increased risk of subsequent treatment failure. Patient-specific respiratory variability might also be a useful predictor of the 4D-CT-induced error in MIP-based internal target volume determination.

  8. Evaluation of the health status of six volunteers from the Mars 500 project using pulse analysis.

    Science.gov (United States)

    Shi, Hong-Zhi; Fan, Quan-Chun; Gao, Jian-Yi; Liu, Jun-Lian; Bai, Gui-E; Mi, Tao; Zhao, Shuang; Liu, Yu; Xu, Dong; Guo, Zhi-Feng; Li, Yong-Zhi

    2017-08-01

    To comprehensively evaluate the health status of 6 volunteers from the Mars 500 Project through analyzing their pulse graphs and determining the changes in cardiovascular function, degree of fatigue and autonomic nervous function. Six volunteers were recruited; all were male aged 26-38 years (average 31.83±4.96 years). Characteristic parameters reflflecting the status of cardiovascular functions were extracted, which included left ventricular contraction, vascular elasticity and peripheral resistance. The degree of fatigue was determined depending on the difference between the calendar age and biological age, which was calculated through the analysis of blood pressure value and characteristic parameters. Based on the values of pulse height variation and pulse time variation on a 30-s pulse graph, autonomic nervous function was evaluated. All parameters examined were marked on an equilateral polygon to form an irregular polygon of the actual fifigure, then health status was evaluated based on the coverage area of the actual fifigure. The results demonstrated: (1) volunteers developed weakened pulse power, increased vascular tension and peripheral resistance, and slight decreased ventricular systolic function; (2) the degree of fatigue was basically mild or moderate; and (3) autonomic nervous function was excited but generally balanced. These volunteers were in the state of sub-health. According to Chinese medicine theories, such symptoms are mainly caused by the weakening of healthy qi, Gan (Liver) failing in free coursing, and disharmony between Gan and Wei (Stomach), which manifests as a weak and string-like pulse.

  9. Projection models for health-effects assessment in populations exposed to radioactive and nonradioactive pollutants. Volume I. Introduction to the SPAHR demographic model for health risk

    Energy Technology Data Exchange (ETDEWEB)

    Collins, J.J.; Lundy, R.T.; Grahn, D.; Ginevan, M.E.

    1982-09-01

    The Simulation Package for the Analysis of Health Risk (SPAHR) is a computer software package based upon a demographic model for health risk projections. The model extends several health risk projection models by making realistic assumptions about the population at risk, and thus represents a distinct improvement over previous models. Complete documentation for use of SPAHR is contained in this five-volume publication. The demographic model in SPAHR estimates population response to environmental toxic exposures. Latency of response, changing dose level over time, competing risks from other causes of death, and population structure can be incorporated into SPAHR to project health risks. Risks are measured by morbid years, number of deaths, and loss of life expectancy. Comparisons of estimates of excess deaths demonstrate that previous health risk projection models may have underestimated excess deaths by a factor of from 2 to 10, depending on the pollutant and the exposure scenario. The software supporting the use of the demographic model is designed to be user oriented. Complex risk projections are made by responding to a series of prompts generated by the package. The flexibility and ease of use of SPAHR make it an important contribution to existing models and software packages. The first volume presents the theory behind the SPAHR health risk projection model and several applications of the model to actual pollution episodes. The elements required for an effective health risk projection model are specified, and the models that have been used to date in health risk projections are outlined. These are compared with the demographic model, whose formulation is described in detail. Examples of the application of air pollution and radiation dose-response functions are included in order to demonstrate the estimation of future mortality and morbidity levels and the range of variation in excess deaths that occurs when populations structure is changed.

  10. Projection models for health-effects assessment in populations exposed to radioactive and nonradioactive pollutants. Volume I. Introduction to the SPAHR demographic model for health risk

    International Nuclear Information System (INIS)

    Collins, J.J.; Lundy, R.T.; Grahn, D.; Ginevan, M.E.

    1982-09-01

    The Simulation Package for the Analysis of Health Risk (SPAHR) is a computer software package based upon a demographic model for health risk projections. The model extends several health risk projection models by making realistic assumptions about the population at risk, and thus represents a distinct improvement over previous models. Complete documentation for use of SPAHR is contained in this five-volume publication. The demographic model in SPAHR estimates population response to environmental toxic exposures. Latency of response, changing dose level over time, competing risks from other causes of death, and population structure can be incorporated into SPAHR to project health risks. Risks are measured by morbid years, number of deaths, and loss of life expectancy. Comparisons of estimates of excess deaths demonstrate that previous health risk projection models may have underestimated excess deaths by a factor of from 2 to 10, depending on the pollutant and the exposure scenario. The software supporting the use of the demographic model is designed to be user oriented. Complex risk projections are made by responding to a series of prompts generated by the package. The flexibility and ease of use of SPAHR make it an important contribution to existing models and software packages. The first volume presents the theory behind the SPAHR health risk projection model and several applications of the model to actual pollution episodes. The elements required for an effective health risk projection model are specified, and the models that have been used to date in health risk projections are outlined. These are compared with the demographic model, whose formulation is described in detail. Examples of the application of air pollution and radiation dose-response functions are included in order to demonstrate the estimation of future mortality and morbidity levels and the range of variation in excess deaths that occurs when populations structure is changed

  11. Relative cerebral blood volume is associated with collateral status and infarct growth in stroke patients in SWIFT PRIME.

    Science.gov (United States)

    Arenillas, Juan F; Cortijo, Elisa; García-Bermejo, Pablo; Levy, Elad I; Jahan, Reza; Goyal, Mayank; Saver, Jeffrey L; Albers, Gregory W

    2017-01-01

    We aimed to evaluate how predefined candidate cerebral perfusion parameters correlate with collateral circulation status and to assess their capacity to predict infarct growth in patients with acute ischemic stroke (AIS) eligible for endovascular therapy. Patients enrolled in the SWIFT PRIME trial with baseline computed tomography perfusion (CTP) scans were included. RAPID software was used to calculate mean relative cerebral blood volume (rCBV) in hypoperfused regions, and hypoperfusion index ratio (HIR). Blind assessments of collaterals were performed using CT angiography in the whole sample and cerebral angiogram in the endovascular group. Reperfusion was assessed on 27-h CTP; infarct volume was assessed on 27-h magnetic resonance imaging/CT scans. Logistic and rank linear regression models were conducted. We included 158 patients. High rCBV ( p = 0.03) and low HIR ( p = 0.03) were associated with good collaterals. A positive association was found between rCBV and better collateral grades on cerebral angiography ( p = 0.01). Baseline and 27-h follow-up CTP were available for 115 patients, of whom 74 (64%) achieved successful reperfusion. Lower rCBV predicted a higher infarct growth in successfully reperfused patients ( p = 0.038) and in the endovascular treatment group ( p = 0.049). Finally, rCBV and HIR may serve as markers of collateral circulation in AIS patients prior to endovascular therapy. Unique identifier: NCT0165746.

  12. SOLERAS - Solar Controlled Environment Agriculture Project. Final report, Volume 1. Project summary

    Energy Technology Data Exchange (ETDEWEB)

    1985-12-30

    A summary of the Solar Controlled Environment Agriculture Project is presented. The design of the greenhouses include transparent double pane glass roof with channels for fluid between the panes, inner pane tinted and double pane extruded acrylic aluminized mylar shade and diffuser. Solar energy technologies provide power for water desalination, for pumping irrigation water, and for cooling and heating the controlled environment space so that crops can grow in arid lands. The project is a joint effort between the United States and Saudi Arabia. (BCS)

  13. NGNP Project 2011 Status and Path Forward

    Energy Technology Data Exchange (ETDEWEB)

    L.E. Demick

    2011-12-01

    High Temperature Gas Reactor (HTGR) technology can play an important role in the United States’ energy future by extending the use of nuclear energy for non-electricity energy production missions as well as continuing to provide a considerable base load electric power generation capability. Extending nuclear energy into the industrial and transportation sectors through the co-production of process heat and electricity provides safe and reliable energy for these sectors in an environmentally responsible manner. The safety case for the modular HTGR provides a substantial improvement in nuclear plant safety for the protection of the public and the environment, and supports collocation of the HTGR with major industrial facilities. The NGNP Project at the Idaho National Laboratory has been working toward an objective of commercializing the HTGR technology under DOE direction since 2006. The Project is undergoing a quantum shift in direction and scope as a result of recent DOE decisions. This paper summarizes where the Project has been, where it is at the time of this writing and what is needed in future activities to commercialize HTGR technology.

  14. Status and prospects of the FaCT project

    International Nuclear Information System (INIS)

    Nagaoki, Yoshihiro; Kikuchi, Shin; Ichimiya, Masakazu

    2008-01-01

    'Fast Reactor Cycle Technology Development (FaCT)' project has been conducted since 2006. In this project, design study and research and development (R and D) on innovative technologies for fast reactor (FR) cycle system are implemented in order to present the conceptual designs of commercial and demonstration facilities by 2015 and start operating demonstration fast reactor in 2025. The R and Ds has been stepped forward into the development stage to establish the realization of innovative technologies which bring excellent performance to fast reactor cycle system. The purpose of R and D by 2010 is to decide whether innovative technologies shall be adopted. So promoting R and D of FR, the project governance was organized. Furthermore, several possible R and D have been effectively carried out within the frameworks of international cooperation, such as Global Nuclear Energy Partnership (GNEP), Generation IV International Forum (GIF), and International Project on Innovative Nuclear Reactors and Fuel Cycles (INPRO). (author)

  15. Long-term archives of land surface albedo products through the EUMETSAT/LSA-SAF and ECMWF/C3S projects: status and project development plan

    Science.gov (United States)

    Carrer, D.; Pinault, F.; Ceamanos, X.; Meurey, C.; Moparthy, S.; Swinnen, E.; Trigo, I.

    2017-12-01

    The two space programs of EUMETSAT (project CDOP3, LSA-SAF) and ECMWF (the Copernicus Climate Change Service; C3S_312a Lot9) provide (or will provide) added-value satellite products for the meteorological and environmental science communities, especially in the fields of climate modeling, environmental management, natural hazards management, and climate change detection. The EUMETSAT/LSA-SAF project started in 1999 with research and development activities. The Third Continuous Development and Operations Phase (CDOP-3) starts in March 2017 and will end in 2022. This project uses instruments on board European satellites that were, or will be, launched between 2004 and 2022. Unlike the LSA-SAF, the COPERNICUS/C3S_312a project has no NRT constraint. Its first phase started in november 2016. One of the major objective of the COPERNICUS/C3S_312a project is to harmonize datasets from various sensors in order to provide consistent and continuous ECV products from the 80's until now.Presently, the delivered operational products comprise several surface albedo products using data from various space missions (METEOSAT, NOAA, METOP, …). We present here the portfolio of the surface albedo products that are disseminated with an operational status. Their characteristics and accuracy are detailed here after. Also we will present the development plan to produce long-term re-analysis and to prepare the arrival of the next generation of satellite (MTG, EPS-SG, ...). This work will lead in 2018 to 40 years of products characterizing the albedo properties of the surface. These programs provide a great opportunity to monitor and identify human-induced climate change since consistent production of data sets is guaranteed until at least 2022.

  16. Shippingport Station Decommissioning Project (SSDP): configuration control system and project activity controls

    International Nuclear Information System (INIS)

    Mullee, G.R.

    1986-01-01

    The SSDP has been using a Configuration Control system as a significant element in the management plan for the safe and effective performance of the project. The objective of the Configuration Control system is to control the physical plant configuration, system status, work schedules, status tracking, and day-to-day problem resolution. Prior to the Decommissioning Operations Contractor (DOC) assuming operational responsibility for the Shippingport Plant, an assessment was made of the status of the configuration of the systems and related documentation. Action was taken as required to match the operating procedures and system documentation with the actual physical condition of the plant. During the first stage of the project, planning was put in place for subsequent decommissioning activities. This planning included defining organizational responsibilities, completing the necessary project instructions and procedures, and doing the planning and scheduling for the subsequent decommissioning phase activities. Detailed instructions for the performance of the various decommissioning tasks were prepared. Prior to the start of any work on a given Activity Package, a Work Authorization is required. The Work Authorization form provides a complete checklist to ensure that all necessary prerequisites are completed. A computerized Communications Configuration Control Information system monitors status including information on system status, tag-outs, radiological work permits, etc. An ongoing effort is being directed toward maintaining operating instructions and system schematics, etc. current as the Plant configuration changes. The experience with the Configuration Control System to date has been favorable

  17. Relationship Between Collateral Status, Contrast Transit, and Contrast Density in Acute Ischemic Stroke.

    Science.gov (United States)

    Kawano, Hiroyuki; Bivard, Andrew; Lin, Longting; Spratt, Neil J; Miteff, Ferdinand; Parsons, Mark W; Levi, Christopher R

    2016-03-01

    Collateral circulation is recognized to influence the life expectancy of the ischemic penumbra in acute ischemic stroke. The best method to quantify collateral status on acute imaging is uncertain. We aimed to determine the relationship between visual collateral status, quantitative collateral assessments, baseline computed tomographic perfusion measures, and tissue outcomes on follow-up imaging. Sixty-six consecutive patients with acute ischemic stroke clinically eligible for recanalization therapy and with M1 or M2 middle cerebral artery occlusion were evaluated. We compared the visual collateral scoring with measures of contrast peak time delay and contrast peak density. We also compared these measures for their ability to predict perfusion lesion and infarct core volumes, final infarct, and infarct growth. Shorter contrast peak time delay (P=0.041) and higher contrast peak density (P=0.002) were associated with good collateral status. Shorter contrast peak time delay correlated with higher contrast peak density (β=-4.413; P=0.037). In logistic regression analysis after adjustment for age, sex, onset-computed tomographic time, and occlusion site, higher contrast peak density was independently associated with good collateral status (P=0.009). Multiple regression analysis showed that higher contrast peak density was an independent predictor of smaller perfusion lesion volume (P=0.029), smaller ischemic core volume (P=0.044), smaller follow-up infarct volume (P=0.005), and smaller infarct growth volume (P=0.010). Visual collateral status, contrast peak density, and contrast peak time delay were inter-related, and good collateral status was strongly associated with contrast peak density. Contrast peak density in collateral vessel may be an important factor in tissue fate in acute ischemic stroke. © 2016 American Heart Association, Inc.

  18. Physics of laser fusion. Volume II. Diagnostics of experiments on laser fusion targets at LLNL

    Energy Technology Data Exchange (ETDEWEB)

    Ahlstrom, H.G.

    1982-01-01

    These notes present the experimental basis and status for laser fusion as developed at LLNL. There are two other volumes in this series: Vol. I, by C.E. Max, presents the theoretical laser-plasma interaction physics; Vol. III, by J.F. Holzrichter et al., presents the theory and design of high-power pulsed lasers. A fourth volume will present the theoretical implosion physics. The notes consist of six sections. The first, an introductory section, provides some of the history of inertial fusion and a simple explanation of the concepts involved. The second section presents an extensive discussion of diagnostic instrumentation used in the LLNL Laser Fusion Program. The third section is a presentation of laser facilities and capabilities at LLNL. The purpose here is to define capability, not to derive how it was obtained. The fourth and fifth sections present the experimental data on laser-plasma interaction and implosion physics. The last chapter is a short projection of the future.

  19. Physics of laser fusion. Volume II. Diagnostics of experiments on laser fusion targets at LLNL

    International Nuclear Information System (INIS)

    Ahlstrom, H.G.

    1982-01-01

    These notes present the experimental basis and status for laser fusion as developed at LLNL. There are two other volumes in this series: Vol. I, by C.E. Max, presents the theoretical laser-plasma interaction physics; Vol. III, by J.F. Holzrichter et al., presents the theory and design of high-power pulsed lasers. A fourth volume will present the theoretical implosion physics. The notes consist of six sections. The first, an introductory section, provides some of the history of inertial fusion and a simple explanation of the concepts involved. The second section presents an extensive discussion of diagnostic instrumentation used in the LLNL Laser Fusion Program. The third section is a presentation of laser facilities and capabilities at LLNL. The purpose here is to define capability, not to derive how it was obtained. The fourth and fifth sections present the experimental data on laser-plasma interaction and implosion physics. The last chapter is a short projection of the future

  20. Medical Data Architecture Project Status

    Science.gov (United States)

    Krihak, M.; Middour, C.; Gurram, M.; Wolfe, S.; Marker, N.; Winther, S.; Ronzano, K.; Bolles, D.; Toscano, W.; Shaw, T.

    2018-01-01

    The Medical Data Architecture (MDA) project supports the Exploration Medical Capability (ExMC) risk to minimize or reduce the risk of adverse health outcomes and decrements in performance due to in-flight medical capabilities on human exploration missions. To mitigate this risk, the ExMC MDA project addresses the technical limitations identified in ExMC Gap Med 07: We do not have the capability to comprehensively process medically-relevant information to support medical operations during exploration missions. This gap identifies that the current in-flight medical data management includes a combination of data collection and distribution methods that are minimally integrated with on-board medical devices and systems. Furthermore, there are a variety of data sources and methods of data collection. For an exploration mission, the seamless management of such data will enable a more medically autonomous crew than the current paradigm. The medical system requirements are being developed in parallel with the exploration mission architecture and vehicle design. ExMC has recognized that in order to make informed decisions about a medical data architecture framework, current methods for medical data management must not only be understood, but an architecture must also be identified that provides the crew with actionable insight to medical conditions. This medical data architecture will provide the necessary functionality to address the challenges of executing a self-contained medical system that approaches crew health care delivery without assistance from ground support. Hence, the products supported by current prototype development will directly inform exploration medical system requirements.

  1. The ANGSTREM project: present status and development activities

    International Nuclear Information System (INIS)

    Stepanov, V.S.; Legyuenko, S.K.; Grigoriev, O.G.; Gromov, B.F.; Dedul, A.V.; Leonchyk, M.P.; Pashkin, Yu.G.; Pankratov, D.V.; Chekunov, V.V.; Skorikov, D.E.

    1998-01-01

    The project ANGSTREM of a modular-transportable nuclear power-and-heating station with assured safety for remote areas is described. The station is based on fast nuclear reactor cooling by a lead-bismuth eutectic. The possible evolution of the project is mentioned in relation to possible new application - sea water desalination or refrigeration plants. (author)

  2. The status of the LANSCE refurbishment project (LANSCE-R)

    International Nuclear Information System (INIS)

    Erickson, John Leonard; Jones, Kevin; Streve, Michael

    2008-01-01

    The Los Alamos Neutron Science Center (LANSCE) accelerator is an 800-MeV proton linac that drives user facilities for isotope production, proton radiography, ultra-cold neutrons, weapons neutron research and various sciences using neutron scattering. The LANSCE Refurbishment Project (LANSCE-R) is an ambitious project to refurbish key elements of the LANSCE accelerator that are becoming obsolete or nearing end-of-life. The conceptual design phase for the project is funded and underway. The 5 year, $170M (US) project will enable future decades of reliable, high-performance operation. It will replace a substantial fraction of the radio-frequency power systems (gridded tubes and klystrons) with modern systems, completely refurbish the original accelerator control and timing systems, replace obsolete diagnostic devices, and modernize other ancillary systems. An overview of the LANSCE-R project will be presented. The functional and operating requirements will be discussed, the proposed technical solutions presented, and the plan for successful project execution while meeting annual customer expectations for beam delivery will be reviewed.

  3. Sustainable Energy (SUSEN) project

    International Nuclear Information System (INIS)

    Richter, Jiri

    2012-01-01

    Research Centre Rez and University of West Bohemia started preparatory work on the 'Sustainable Energy' project, financed from EU structural funds. The goals and expected results of the project, its organization, estimated costs, time schedule and current status are described. (orig.)

  4. Web-based Project Reporting System

    Data.gov (United States)

    US Agency for International Development — Web-PRS is a web-based system that captures financial information and project status information that is sortable by geographical location, pillar, project type and...

  5. Western Gas Sands Project status report

    Energy Technology Data Exchange (ETDEWEB)

    Atkinson, C.H.

    1978-11-30

    Progress of government-sponsored projects directed toward increasing gas production from the low-permeability gas sands of the western United States is summarized. A Technology Implementation Plan (TIP) meeting was held at the CER office in Las Vegas, Nevada, October 16--19 to initiate the implementation phase of the Enhanced Gas Recovery (EGR) working group activities. A WGSP Logging Program meeting was conducted on October 24, 1978, at CER offices to define the problems associated with logs in tight gas sands. CER personnel and the project manager attended a two-day course on the fundamentals of core and reservoir analysis in Denver, Colorado, and met with USGS personnel to discuss USGS work on the WGSP. A meeting was held to discuss a contract for coring a Twin Arrow well on the Douglas Creek Arch, Colorado. CER Corporation personnel attended the Geological Society of America Annual Meeting held in Toronto, Canada, October 23--27 and a Gas Stimulation Workshop at Sandia Laboratories in Albuquerque, New Mexico, October 11 and 12 to discuss recent mineback experiments conducted at the Nevada Test Site. Fiscal year 1979 projects initiated by USGS and the Energy Technology Centers and National Laboratories are progressing as scheduled. Mobil Research and Development Corporation fractured zone 8 of the F-31-13G well in Rio Blanco County, Colorado. Colorado Interstate Gas Company poured the concrete pad for the compresser expected to be delivered in December and were laying pipeline between the wells at month end. The Mitchell Energy well, Muse Duke No. 1 was flowing on test at a rate of 2,100 Mcfd and preparations proceeded to fracture the well on November 15 with approximately 1,000,000 gal of fluid and 3,000,000 lb of sand. Terra Tek completed laboratory analyses of cores taken from the Mitchell Energy well.

  6. Status of PACMAN Project at CERN

    CERN Document Server

    Catalan-Lasheras, Nuria; Modena , Michele

    2015-01-01

    Though the Large Hadron Collider (LHC) at CERN is just at the start of a program expected to run for 20 additional years, CERN is studying the next generation of colliders, like the Compact Linear Collider (CLIC). This project proposes an electron-positron collider with a length close to 50 km and with a centre of mass energy of 3 TeV at the collision point. One of the main challenges is the sub-micrometric size of the beams, down to a few nanometres at the interaction point. As a consequence, the accelerator will require unprecedented nanometric tolerances of beam alignment. A series of several thousands components will have to be assembled, aligned at the micrometre level and most critically, stabilized actively at the nanometre level. PACMAN, a study on Particle Accelerator Components Metrology and Alignment to the Nanometre scale, is a Marie Curie Program supported by the European Commission (FP7 Program), creating a network of 16 Academic and Industrial Partners. The project is hosted at CERN and it offe...

  7. Market projections of cellulose nanomaterial-enabled products-- Part 2: Volume estimates

    Science.gov (United States)

    John Cowie; E.M. (Ted) Bilek; Theodore H. Wegner; Jo Anne Shatkin

    2014-01-01

    Nanocellulose has enormous potential to provide an important materials platform in numerous product sectors. This study builds on previous work by the same authors in which likely high-volume, low-volume, and novel applications for cellulosic nanomaterials were identified. In particular, this study creates a transparent methodology and estimates the potential annual...

  8. Subseabed disposal program annual report, January-December 1980. Volume II. Appendices (principal investigator progress reports). Part 1

    International Nuclear Information System (INIS)

    Hinga, K.R.

    1981-07-01

    Volume II of the sixth annual report describing the progress and evaluating the status of the Subseabed Disposal Program contains the appendices referred to in Volume I, Summary and Status. Because of the length of Volume II, it has been split into two parts for publication purposes. Part 1 contains Appendices A-Q; Part 2 contains Appendices R-MM. Separate abstracts have been prepared for each appendix for inclusion in the Energy Data Base

  9. Subseabed disposal program annual report, January-December 1980. Volume II. Appendices (principal investigator progress reports). Part 1

    Energy Technology Data Exchange (ETDEWEB)

    Hinga, K.R. (ed.)

    1981-07-01

    Volume II of the sixth annual report describing the progress and evaluating the status of the Subseabed Disposal Program contains the appendices referred to in Volume I, Summary and Status. Because of the length of Volume II, it has been split into two parts for publication purposes. Part 1 contains Appendices A-Q; Part 2 contains Appendices R-MM. Separate abstracts have been prepared for each appendix for inclusion in the Energy Data Base.

  10. The ANTARES project

    International Nuclear Information System (INIS)

    Amram, Ph.; Anvar, S.; Aslanides, E.; Aubert, J.J.; Azoulay, R.; Basa, S.; Benhammou, Y.; Bernard, F.; Berthier, R.; Bertin, V.; Billault, M.; Biller, S.; Blanc, F.; Blanc, P.E.; Bland, R.W.; Blondeau, F.; Botton, N. de; Bottu, N.; Boulesteix, J.; Brooks, B.; Brunner, J.; Calzas, A.; Carloganu, C.; Carr, J.; Carton, P.H.; Cartwright, S.; Cases, R.; Cassol, F.; Charles, F.; Charles, J.; Desages, F.; Destelle, J.J.; Dispau, G.; Duval, P.Y.; Engelen, J.; Feinstein, F.; Flores, E.C.; Fopma, J.; Fuda, J.L.; Goret, P.; Gosset, L.; Gournay, J.F.; Hernandez, J.J.; Hubaut, F.; Hubbard, R.; Huss, D.; Jaquet, M.; Jelley, N.; Kajfasz, E.; Kouchner, A.; Kudryavtsev, V.; Lachartre, D.; Lafoux, H.; Lamare, P.; Languillat, J.C.; Laugier, J.P.; Le Provost, H.; Loiseau, D.; Loucatos, S.; Magnier, P.; Marc, K.; Marcelin, M.; Martin, L.; Mazeau, B.; Mazure, A.; McMillan, J.; Meessen, C.; Millot, C.; Mols, P.; Montanet, F.; Moorhead, M.; Moscoso, L.; Navas, S.; Nooren, Van; Olivetto, C.; Palanque-Delabrouille, N.; Pallares, A.; Payre, P.; Perrin, P.; Poinsignon, J.; Potheau, R.; Qian, Z.; Raymond, M.; Roberts, J.; Sacquin, Y.; Schuller, J.P; Schuster, W.; Spooner, N.; Stolarczyk, T.; Tabary, A.; Talby, M; Tao, C.; Thompson, L.; Triay, R.; Valdy, M.; Velasco, J.; Vigeolas, E.; Vignaud, D.; Vilanova, D.; Wark, D.; Zuniga, J.

    1999-01-01

    The ANTARES project is an international collaboration with the aim of building a deep-sea large area neutrino telescope within the next decade. The achievements and status of the project as at the time of the conference are briefly discussed, and short term steps as well as longer term plans are described

  11. A cientificidade das técnicas projetivas em debate The scientific status of projective techniques in discussion

    Directory of Open Access Journals (Sweden)

    Anna Elisa de Villemor-Amaral

    2006-12-01

    Full Text Available O objetivo deste trabalho é rever uma série especial de artigos antagônicos sobre a validade e o status científico dos métodos projetivos, uma vez que o foco dos debates atuais recai novamente sobre o mérito das técnicas projetivas em contraposição às objetivas, principalmente no que diz respeito ao pouco rigor metodológico nos estudos de validação e ausência de validade incremental, o que, conseqüentemente, repercute na credibilidade dos profissionais e pesquisadores que as utilizam. Neste artigo, dá-se destaque ao que há de procedente em tais discussões, bem como nas distorções ou falácias geradas nesta última década sobre os três procedimentos mais utilizados para avaliação da personalidade, no Brasil e exterior: o Método de Rorschach no Sistema Compreensivo, RCS; o Teste de Apercepção Temática, TAT e o Desenho da Figura Humana, DFH. Os referenciais apresentados sobre a utilidade clínica e diagnóstica desses instrumentos mostram-se igualmente úteis na ponderação de estudos e na discussão de questões relativas às técnicas projetivas de modo geral.The aim of this paper is to review and discuss a special series of antagonistic articles about the scientific status of the projective methods for personality assessment since the focus of the current debates has fallen again into the merit of the projectives in contraposition to the objective techniques. The critics are mainly in respect to the little methodologic procedures in the validation studies as well the absence of incremental validity for the projective methods, what consequently reverberates in the credibility of the professionals and researchers who use them. In this circumstances, this work emphasizes the positive aspects on the controversial as well the distortions or fallacies generated in this last decade about the three used procedures for personality assessment, in Brazil and exterior: the Method of Rorschach in the Comprehensive System, RCS

  12. Achievement report in fiscal 1999 on commissioned research project. 'Model project for facilities to effectively utilize wastes from industrial complexes in Thailand' Project for 1999 Volume 3; 1999 nendo seika hokokusho. Tai ni okeru kogyo danchi sangyo haikibutsu yuko riyo setsubi moderu jigyo - 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With an objective to reuse industrial wastes and effectively utilize them as a petroleum replacing energy resource, and attempt to reduce consumption of fossil fuel in Thailand where increase in discharge of industrial wastes is estimated, a model project for facilities to effectively utilize wastes from industrial complexes has been carried out. This paper reports the achievements in fiscal 1999. Specifically, the project calls for incineration in fluidized bed incinerators of industrial wastes discharged from factories in industrial complexes possessed by the Industrial Estate Authority of Thailand (IEAT), recovery of waste heat from waste heat recovering boilers to generate process steam, which is supplied to the factories in the complexes. The current fiscal year, which is the first current year of the project, has put into order the operations shared by Japan and Thailand, compiled the various procedures and schedules into the form of appendices to the agreement, and executed signing of the agreement. Thereafter, the Japanese side has carried out decision on the specifications of the facilities, the basic designs, the detailed designs of facilities to be arranged by Japan, and the fabrication of some of the devices according to the descriptions of the agreement appendices. The volume 3 summarizes the inspection reports other than those included in the Volume 2. (NEDO)

  13. Hazardous materials in aquatic environments of the Mississippi River basin. Quarterly project status report, April 1, 1993--June 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    During this quarter, the Review Panel made its final recommendations regarding which of the proposals should be funded. Included in this report is a brief status report of each of the research and education projects that are currently funded in this project. The Coordinated Instrumentation Facility (CIF) sponsored 3 seminars on Environmental Sample Preparation Techniques. These seminars were designed to educate the investigators on the use of microwave digestion systems for sample preparation and the use of Inductively Coupled Plasma and Atomic Absorption Specrtroscopy for analyses. During this period, Tulane and Xavier Universities have worked closely with Oak Ridge National Laboratories (ORNL) to develop a long term relationship that will encourage interaction and collaborations among the investigators at all of the institutions.

  14. Using Mobile Device Samples to Estimate Traffic Volumes

    Science.gov (United States)

    2017-12-01

    In this project, TTI worked with StreetLight Data to evaluate a beta version of its traffic volume estimates derived from global positioning system (GPS)-based mobile devices. TTI evaluated the accuracy of average annual daily traffic (AADT) volume :...

  15. The Imo State (Nigeria) Drinking Water Supply and Sanitation Project, 2. Impact on dracunculiasis, diarrhoea and nutritional status.

    Science.gov (United States)

    Huttly, S R; Blum, D; Kirkwood, B R; Emeh, R N; Okeke, N; Ajala, M; Smith, G S; Carson, D C; Dosunmu-Ogunbi, O; Feachem, R G

    1990-01-01

    Morbidity due to dracunculiasis (guinea worm disease) and diarrhoea in persons of all ages, and nutritional status of young children, were used as health impact indicators in the evaluation of the Imo State Drinking Water Supply and Sanitation Project in south-eastern Nigeria. Data were collected using repeated cross-sectional surveys and longitudinal follow-up. The study area was found to have a low level of endemicity of dracunculiasis. While no impact could be demonstrated on overall period or point prevalence rates in the cross-sectional surveys, a prospective longitudinal survey showed a significant reduction in the percentage of person-fortnights positive for dracunculiasis in areas served by the project, while the control areas showed no such change. In the cross-sectional surveys it was found that, in the project villages, those persons drinking only borehole water had significantly lower period prevalence rates one year later than others. Moreover, those living further from the nearest borehole had higher rates of dracunculiasis. An impact of the project on diarrhoea morbidity was found only in limited sub-groups of the population. A greater association with water availability rather than quality was suggested for rates in young children. The prevalence of wasting (less than 80% weight-for-height) among children aged less than 3 years decreased significantly over time in all 3 intervention villages; there was no such decline in the control villages.

  16. The U.S. National Hydrogen Storage Project

    International Nuclear Information System (INIS)

    Sunita Satyapal; Carole Read; Grace Ordaz; John Petrovic; George Thomas

    2006-01-01

    Hydrogen is being considered by many countries as a potential energy carrier for vehicular applications. In the United States, hydrogen-powered vehicles must possess a driving range of greater than 300 miles in order to meet customer requirements and compete effectively with other technologies. For the overall vehicular fleet, this requires that a range of 5-13 kg of hydrogen be stored on-board. The storage of such quantities of hydrogen within vehicular weight, volume, and system cost constraints is a major scientific and technological challenge. The targets for on-board hydrogen storage were established in the U.S. through the FreedomCAR and Fuel partnership, a partnership among the U.S. Department of Energy, the U.S. Council for Automotive Research (USCAR) and major energy companies. In order to achieve these long-term targets, the Department of Energy established a National Hydrogen Storage Project to develop the areas of metal hydrides, chemical hydrogen storage, carbon-based and high-surface-area sorbent materials, and new hydrogen storage materials and concepts. The current status of vehicular hydrogen storage is reviewed and hydrogen storage research associated with the National Hydrogen Storage Project is discussed. (authors)

  17. Impact of low mini-mental status on health outcome up to 5 years after stroke: the Erlangen Stroke Project.

    Science.gov (United States)

    Liman, T G; Heuschmann, P U; Endres, M; Flöel, A; Schwab, S; Kolominsky-Rabas, P L

    2012-06-01

    Cognitive deficits are frequent stroke sequelae. Data from population-based stroke cohorts on the impact of cognitive deficits on long-term outcome are scarce. The purpose of this study was to investigate the impact of low mini-mental status on health outcome up to 5 years after first-ever stroke. Data were collected from the Erlangen Stroke Project, a population-based stroke registry covering a source population of 103,000 inhabitants. The Mini-Mental State Examination (MMSE) was used to assess global cognitive function. Health outcome included limitations in instrumental activities of daily living (IADL, Frenchay Activities Index), low independence in activities of daily living (ADL, Barthel Index), depressive symptoms (Zung Self Rating Depression Scale), and institutionalization. Using multivariate logistic regression analysis, association of an education-adjusted MMSE score ≤ 24 with these health outcomes was investigated within distinct models at 12, 36, and 60 months after stroke as well as predictors at 3 months for low IADL. A total of 705 patients with first-ever stroke were included. Institutionalization, low levels of ADL and IADL (p mini-mental status up to 3 years after stroke (OR 2.69, 95% CI 1.2-5.8) as well as older age (p mini-mental status has an independent impact on long-term health outcome after stroke. Our results emphasize the importance of cognitive status screening to identify stroke survivors at risk and manage and treat these patients more efficiently.

  18. Haematological status in elite long-distance runners

    DEFF Research Database (Denmark)

    Suetta, C; Kanstrup, I L; Fogh-Andersen, N

    1996-01-01

    In 10 female and eight male Danish elite middle- and long-distance runners, haematological status, including blood volume, was examined. Haemoglobin, haematocrit and serum (s)-ferritin concentrations were all within the normal range. In both men and women, blood volume, plasma volume...... and erythrocyte volume were increased in relation to various reference values. However, the runners had a low body weight due to a reduced fat level, 9.5% (7.3-15.1%) fat for the women, 5.9% (5.0-8.8%) fat (median and ranges) for the men, measured by dual-energy X-ray absorptiometry (DEXA) scanning. When...... the runners' body weights were 'normalized' to a reference population (25% fat for women, 15% fat for men), only plasma volume remained increased in relation to body weight for the women, whereas all the volumes remained increased for the men. This confirms that endurance training induces a true increased...

  19. Status of readout integrated circuits for radiation detector

    International Nuclear Information System (INIS)

    Moon, B. S.; Hong, S. B.; Cheng, J. E. and others

    2001-09-01

    In this report, we describe the current status of readout integrated circuits developed for radiation detectors, along with new technologies being applied to this field. The current status of ASCIC chip development related to the readout electronics is also included in this report. Major sources of this report are from product catalogs and web sites of the related industries. In the field of semiconductor process technology in Korea, the current status of the multi-project wafer(MPW) of IDEC, the multi-project chip(MPC) of ISRC and other domestic semiconductor process industries is described. In the case of other countries, the status of the MPW of MOSIS in USA and the MPW of EUROPRACTICE in Europe is studied. This report also describes the technologies and products of readout integrated circuits of industries worldwide

  20. Sandia Software Guidelines, Volume 2. Documentation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This volume is one in a series of Sandia Software Guidelines intended for use in producing quality software within Sandia National Laboratories. In consonance with the IEEE Standards for software documentation, this volume provides guidance in the selection of an adequate document set for a software project and example formats for many types of software documentation. A tutorial on life cycle documentation is also provided. Extended document thematic outlines and working examples of software documents are available on electronic media as an extension of this volume.

  1. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1992 quality program status report

    International Nuclear Information System (INIS)

    Bolivar, S.L.; Burningham, A.; Chavez, P.

    1994-03-01

    This status report summarizes the activities and accomplishments of the Los Alamos Yucca Mountain Site Characterization Project's quality assurance program for calendar year 1992. The report includes major sections on Program Activities and Trend Analysis. Program Activities are discussed periodically at quality meetings. The most significant issue addressed in 1992 has been the timely revision of quality administrative procedures. The procedure revision process was streamlined from 55 steps to 7. The number of forms in procedures was reduced by 38%, and the text reduced by 29%. This allowed revision in 1992 of almost half of all implementing procedures. The time necessary to complete the revision process (for a procedure) was reduced from 11 months to 3 months. Other accomplishments include the relaxation of unnecessarily strict training requirements, requiring quality assurance reviews only from affected organizations, and in general simplifying work processes. All members of the YMP received training to the new Orientation class Eleven other training classed were held. Investigators submitted 971 records to the Project and only 37 were rejected. The software program has 115 programs approved for quality-affecting work. The Project Office conducted 3 audits and 1 survey of Los Alamos activities. We conducted 14 audits and 4 surveys. Eight corrective action reports were closed, leaving only one open. Internally, 22 deficiencies were recognized. This is a decrease from 65 in 1991. Since each deficiency requires about 2 man weeks to resolve, the savings are significant. Problems with writing acceptable deficiency reports have essentially disappeared. Trend reports for 1992 were examined and are summarized herein. Three adverse trends have been closed; one remaining adverse trend will be closed when the affected procedures are revised. The number of deficiencies issued to Los Alamos compared to other participants is minimal

  2. Richland Environmental Restoration Project management action process document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  3. Richland Environmental Restoration Project management action process document

    International Nuclear Information System (INIS)

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines

  4. Benefits Analysis of Past Projects. Volume 2. Individual Project Assessments.

    Science.gov (United States)

    1984-11-01

    010 inch. Chemical milling was found to be an effective method for removing the surface enrichment. Also 4140 and H13 steel dies were found to result... tooling surface due to the reaction r,* it;nium and t . 22-4-9 steel toolin,. Oxidation and leveling .I ,.. Jevelope in this project yielded tool life...dimensions without expensive tool rework. The process has a potential for reducing mold inclusions since the mold surfaces in contact with the metal can

  5. Waste Isolation Pilot Plant: Geotechnical field data and analysis report, July 1986-June 1987: Volume 2

    International Nuclear Information System (INIS)

    1988-03-01

    The Geotechnical Field Data and Analysis Report (GFDAR) is prepared to provide a timely assessment of the geotechnical status of the Waste Isolation Pilot Plant (WIPP). During the period of shaft sinking and construction of the principal underground access and experimental areas, reporting was on a quarterly basis. Because geotechnical responses of existing underground facilities have slowed to nearly steady-state and excavation of the waste storage panels will take place more slowly and over an extended period, reporting in the coming years will be on an annual cycle. Volume 2 constitutes the principal documentation and presentation of data and techniques used to acquire the data, the performance history of the instrumentation, and the complete set of data from each of the underground facilities. In addition, it presents the results of geologic logging, stratigraphic mapping, and mapping and evaluation of excavation-induced fractures. This volume has as its anticipated audience those Project personnel who need to perform data analyses beyond those provided in Volume 1, and external personnel who may choose to perform other analyses and evaluations for their own purposes. 2 refs., 368 figs., 27 tabs

  6. Environment and safety research status report: 1993

    International Nuclear Information System (INIS)

    1993-03-01

    The 1993 status report discusses ongoing and planned research activities in the GRI Environment and Safety Program. The objectives and goals, accomplishments, and strategy along with the basis for each project area are presented for the supply, end use, and gas operations subprograms. Within the context of these subprograms, contract status summaries under their conceptual titles are given for the following project areas: Gas Supply Environmental and Safety Research, Air Quality Research, End Use Equipment Safety Research, Gas Operations Safety Research, Liquefied Natural Gas, Safety Research, and Gas Operations Environmental Research

  7. Status of the CP-PACS Project

    International Nuclear Information System (INIS)

    Ukawa, A.

    1995-01-01

    The CP-PACS Project, which started in April 1992, is a five-year plan to develop a massively parallel computer for carrying out research in computational physics with primary emphasis on lattice QCD. This article describes the architectural design of the CP-PACS computer, the entire computing system including the front end and mass storage, and results of benchmarks for the expected performance for lattice QCD applications. ((orig.))

  8. The CHEMVAL 2 project - status report

    International Nuclear Information System (INIS)

    Read, D.

    1993-01-01

    This paper summarizes the progress made during the first year of CHEMVAL 2, a coordinated four year research programme for evaluating and enhancing chemical models used in radiological risk assessment. Eighteen organisations from nine countries are currently participating, several of whom are also undertaking related experimental studies within the Commission of European Communities (CEC) MIRAGE Project (Migration of Radionuclides in the geosphere) - Third Phase. 16 refs., 3 figs

  9. Site Environmental Report for 2012, Volumes 1& 2

    Energy Technology Data Exchange (ETDEWEB)

    Pauer, Ron; Baskin, David; Bauters, Tim; Borglin, Ned; Fox, Robert; Horst, Blair; Jelinski, John; Lackner, Ginny; Philliber, Jeff; Thorson, Patrick; Wahl, Linnea; Wehle, Petra; Xu, Suying; None

    2013-09-30

    This report provides a comprehensive summary of the environmental program activities at LBNL for the calendar year 2012. Volume I is organized into an executive summary followed by six chapters that include an overview of LBNL, a discussion of its Environmental Management System (EMS), the status of environmental programs, summarized results from surveillance and monitoring activities, and quality assurance (QA) measures. Volume II contains individual data results from surveillance and monitoring activities.

  10. Tuberculosis Relief Belt Supporting Project (Tuberculosis Patient Management Project for Poverty Group).

    Science.gov (United States)

    Kim, Jae Kyoung; Jeong, Ina; Lee, Ji Yeon; Kim, Jung Hyun; Han, Ah Yeon; Kim, So Yeon; Joh, Joon Sung

    2018-03-07

    The "Tuberculosis Relief Belt Supporting Project (Tuberculosis Patient Management Project for Poverty Groups)" is a national program for socioeconomically vulnerable tuberculosis (TB) patients. We sought to evaluate the clinical and socioeconomic characteristics of poverty-stricken TB patients, and determined the need for relief. We examined in-patients with TB, who were supported by this project at the National Medical Center from 2014 to 2015. We retrospectively investigated the patients' socioeconomic status, clinical characteristics, and project expenditures. Fifty-eight patients were enrolled. Among 55 patients with known income status, 24 (43.6%) had no income. Most patients (80%) lived alone. A total of 48 patients (82.8%) had more than one underlying disease. More than half of the enrolled patients (30 patients, 51.7%) had smear-positive TB. Cavitary disease was found in 38 patients (65.5%). Among the 38 patients with known resistance status, 19 (50%) had drug-resistant TB. In terms of disease severity, 96.6% of the cases had moderate-to-severe disease. A total of 14 patients (26.4%) died during treatment. Nursing expenses were supported for 12 patients (20.7%), with patient transportation costs reimbursed for 35 patients (60%). In terms of treatment expenses for 31 people (53.4%), 93.5% of them were supported by uninsured benefits. Underlying disease, infectivity, drug resistance, severity, and death occurred frequently in socioeconomically vulnerable patients with TB. Many uninsured treatment costs were not supported by the current government TB programs, and the "Tuberculosis Relief Belt Supporting Project" compensated for these limitations. Copyright©2018. The Korean Academy of Tuberculosis and Respiratory Diseases.

  11. Ghrelin and its Association with Nutritional and Inflammatory Status ...

    African Journals Online (AJOL)

    ... 4Department of Pharmacy Practice, Saastra College of Pharmaceutical Education and Research, ... Keywords: Appetite, Ghrelin, Hemodialysis, Inflammation, Nutritional status .... the control groups included hemoglobin, packed cell volume,.

  12. Is socio-economic status a determinant of HIV-related stigma attitudes in Zimbabwe? Findings from Project Accept

    Directory of Open Access Journals (Sweden)

    Kudzanai Mateveke

    2016-08-01

    Full Text Available HIV related stigma and discrimination is a known barrier for HIV prevention and care. We aimed to assess the relationship between socio-economic status (SES and HIV related stigma in Zimbabwe. This paper uses data from Project Accept, which examined the impact of community-based voluntary counseling and testing intervention on HIV incidence and stigma. Total of 2522 eligible participants responded to a psychometric assessment tool, which assessed HIV related stigma and discrimination attitudes on 4 point Likert scale. The tool measured three components of HIVrelated stigma: shame, blame and social isolation, perceived discrimination, and equity. Participants’ ownership of basic assets was used to assess the socio-economic status. Shame, blame and social isolation component of HIV related stigma was found to be significantly associated with medium [odds ratio (OR=1.73, P<0.01] and low SES (OR=1.97, P<0.01, indicating more stigmatizing attitudes by participants belonging to medium and low SES in comparison to high SES. For HIV related stigma and discrimination programs to be effective, they should take into account the socio-economic context of target population.

  13. MANHATTAN DISTRICT HISTORY PROJECT Y THE LOS ALAMOS PROJECT VOL. I INCEPTION UNTIL AUGUST 1945

    Energy Technology Data Exchange (ETDEWEB)

    Hawkins, D.

    1961-12-01

    THESE TWO VOLUMES CONSTITUTE A RECORD OF THE TECHNICAL, ADMINISTRATIVE , AND POLICY-MAKING ACTIVITIES OF THE LOS ALAMOS PROJECT (PROJECT Y) FROM ITS INCEPTION UNDER THE MANHATTAN DISTRICT THROUGH THE DEVELOPMENT OF THE ATOMIC BOMB (VOL. I), AND DURING THE PERIOD FOLLOWING THE END OF WORLD WAR II UNTIL THE MANHATTAN DISTRICT RELINQUISHED CONTROL TO THE ATOMIC ENERGY COMMISSION AS OF JANUARY 1947 (VOL. II). ALTHOUGH SECURITY REGULATIONS HAVE REQUIRED SOME DELETIONS IN THE ORIGINAL TEXT OF THE TWO VOLUMES, EVERY EFFORT HAS BEEN MADE TO RETAIN THE ORIGINAL LANGUAGE AND EXPRESSIONS OF THE AUTHORS.

  14. Projected entangled pair states: status and prospects

    Energy Technology Data Exchange (ETDEWEB)

    Verstraete, Frank [Universitaet Wien (Austria)

    2008-07-01

    We report on the progress made to extend the density matrix renormalization group to higher dimensions, discuss the underlying theory of projected entangled pair states (PEPS) and illustrate its potential on the hand of a few examples.

  15. Breckinridge Project, initial effort

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    1982-09-01

    Report III, Volume 1 contains those specifications numbered A through J, as follows: General Specifications (A); Specifications for Pressure Vessels (C); Specifications for Tanks (D); Specifications for Exchangers (E); Specifications for Fired Heaters (F); Specifications for Pumps and Drivers (G); and Specifications for Instrumentation (J). The standard specifications of Bechtel Petroleum Incorporated have been amended as necessary to reflect the specific requirements of the Breckinridge Project, and the more stringent specifications of Ashland Synthetic Fuels, Inc. These standard specifications are available to the Initial Effort (Phase Zero) work performed by all contractors and subcontractors. Report III, Volume 1 also contains the unique specifications prepared for Plants 8, 15, and 27. These specifications will be substantially reviewed during Phase I of the project, and modified as necessary for use during the engineering, procurement, and construction of this project.

  16. Major risk from rapid, large-volume landslides in Europe (EU Project RUNOUT)

    Science.gov (United States)

    Kilburn, Christopher R. J.; Pasuto, Alessandro

    2003-08-01

    Project RUNOUT has investigated methods for reducing the risk from large-volume landslides in Europe, especially those involving rapid rates of emplacement. Using field data from five test sites (Bad Goisern and Köfels in Austria, Tessina and Vajont in Italy, and the Barranco de Tirajana in Gran Canaria, Spain), the studies have developed (1) techniques for applying geomorphological investigations and optical remote sensing to map landslides and their evolution; (2) analytical, numerical, and cellular automata models for the emplacement of sturzstroms and debris flows; (3) a brittle-failure model for forecasting catastrophic slope failure; (4) new strategies for integrating large-area Global Positioning System (GPS) arrays with local geodetic monitoring networks; (5) methods for raising public awareness of landslide hazards; and (6) Geographic Information System (GIS)-based databases for the test areas. The results highlight the importance of multidisciplinary studies of landslide hazards, combining subjects as diverse as geology and geomorphology, remote sensing, geodesy, fluid dynamics, and social profiling. They have also identified key goals for an improved understanding of the physical processes that govern landslide collapse and runout, as well as for designing strategies for raising public awareness of landslide hazards and for implementing appropriate land management policies for reducing landslide risk.

  17. Survey of Biomass Gasification, Volume II: Principles of Gasification

    Energy Technology Data Exchange (ETDEWEB)

    Reed, T.B. (comp.)

    1979-07-01

    Biomass can be converted by gasification into a clean-burning gaseous fuel that can be used to retrofit existing gas/oil boilers, to power engines, to generate electricity, and as a base for synthesis of methanol, gasoline, ammonia, or methane. This survey describes biomass gasification, associated technologies, and issues in three volumes. Volume I contains the synopsis and executive summary, giving highlights of the findings of the other volumes. In Volume II the technical background necessary for understanding the science, engineering, and commercialization of biomass is presented. In Volume III the present status of gasification processes is described in detail, followed by chapters on economics, gas conditioning, fuel synthesis, the institutional role to be played by the federal government, and recommendations for future research and development.

  18. Taipower - latest projects to boost coal import levels

    Energy Technology Data Exchange (ETDEWEB)

    Hargreaves, D

    1985-05-01

    The activities are reviewd for Taipower, the state enterprise electrical power utility for Taiwan RC: its generating facilities and comparability; the status of major projects, especially the Taichung thermal project; the status of coal; coal burn performance; air pollution controls; coal ash performance; coal imports; transport logistics; including terminal facilities at the Taichung thermal power plant.

  19. Subseabed disposal program annual report, January-December 1979. Volume II. Appendices (principal investigator progress reports). Part 1 of 2

    International Nuclear Information System (INIS)

    Talbert, D.M.

    1981-04-01

    Volume II of the sixth annual report describing the progress and evaluating the status of the Subseabed Disposal Program contains the appendices referred to in Volume I, Summary and Status. Because of the length of Volume II, it has been split into two parts for publication purposes. Part 1 contains Appendices A-O; Part 2 contains Appendices P-FF. Separate abstracts have been prepared of each Appendix for inclusion in the Energy Data Base

  20. Subseabed disposal program annual report, January-December 1979. Volume II. Appendices (principal investigator progress reports). Part 2 of 2

    International Nuclear Information System (INIS)

    Talbert, D.M.

    1981-04-01

    Volume II of the sixth annual report describing the progress and evaluating the status of the Subseabed Disposal Program contains the appendices referred to in Volume II, Summary and Status. Because of the length of Volume II, it has been split into two parts for publication purposes. Part 1 contains Appendices A-O; Part 2 contains Appendices P-FF. Separate abstracts have been prepared for each appendix for inclusion in the Energy Data Base

  1. Analysis of the Status and Impacts of NCTR Projects

    Science.gov (United States)

    2012-08-01

    The National Center for Transit Research (NCTR) at the University of South Florida (USF) assessed the implementation status and identified the outcomes and impacts of the results of 30 Florida Department of Transportation -sponsored NCTR research pro...

  2. Status of voluntary restraint

    Energy Technology Data Exchange (ETDEWEB)

    Aarts, W. [SWOKA Institute for Strategic Consumer Behaviour, Leiden (Netherlands)

    2000-05-01

    Do people enjoying a higher status, especially those with a higher education, constrain their consumption more than others? In general, higher status and high levels of consumption go hand in hand. But the greater availability of luxury goods has led to a decline in their exclusivity. Since environmental awareness has increased, a countercurrent may be possible. It is possible that certain high status groups, the environmentally aware trendsetters, can now be distinguished by their voluntary restraint rather than by their conspicuous consumption. This hypothesis formed the basis for a sociological doctoral project at the University of Amsterdam. The research was conducted under the umbrella of the National Research Programme on Global Air Pollution and Climate Change.

  3. The Energy Information Administration`s assessment of reformulated gasoline. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-28

    This report is divided into two volumes. The first volume contains EIA`s findings and analyses on reformulated gasoline as it affects the petroleum industry. The data contained herein should assist members of the Congress, Federal, State and local governments, analysts, researchers, the media and academia to understand the RFG program and the current status of implementation. This second volume contains 10 appendices that include letter from Congressman Dingell, survey results, survey forms, and historical summary data. A glossary and a list of acronyms and abbreviations are printed in Volumes 1 and 2.

  4. Topical report review status

    International Nuclear Information System (INIS)

    1982-08-01

    A Topical Report Review Status is scheduled to be published semi-annually. The primary purpose of this document is to provide periodic progress reports of on-going topical report reviews, to identify those topical reports for which the Nuclear Regulatory Commission (NRC) staff review has been completed and, to the extent practicable, to provide NRC management with sufficient information regarding the conduct of the topical report program to permit taking whatever actions deemed necessary or appropriate. This document is also intended to be a source of information to NRC Licensing Project Managers and other NRC personnel regarding the status of topical reports which may be referenced in applications for which they have responsibility. This status report is published primarily for internal NRC use in managing the topical report program, but is also used by NRC to advise the industry of report review status

  5. Topical report review status

    International Nuclear Information System (INIS)

    1983-01-01

    A Topical Report Review Status is scheduled to be published semi-annually. The primary purpose of this document is to provide periodic progress reports of on-going topical report reviews, to identify those topical reports for which the Nuclear Regulatory Commission (NRC) staff review has been completed and, to the extent practicable, to provide NRC management with sufficient information regarding the conduct of the topical report program to permit taking whatever actions deemed necessary or appropriate. This document is also intended to be a source of information to NRC Licensing Project Managers and other NRC personnel regarding the status of topical reports which may be referenced in applications for which they have responsibility. This status report is published primarily for internal NRC use in managing the topical report program, but is also used by NRC to advise the industry of report review status

  6. Project Lifescape 5. Butterfly Accounts

    Indian Academy of Sciences (India)

    Home; Journals; Resonance – Journal of Science Education; Volume 5; Issue 3. Project Lifescape: Butterfly Accounts. Krushnamegh J Kunte. Classroom Volume 5 Issue 3 March 2000 pp 86-97. Fulltext. Click here to view fulltext PDF. Permanent link: https://www.ias.ac.in/article/fulltext/reso/005/03/0086-0097 ...

  7. Peripheral i.v. analysis (PIVA) of venous waveforms for volume assessment in patients undergoing haemodialysis.

    Science.gov (United States)

    Hocking, K M; Alvis, B D; Baudenbacher, F; Boyer, R; Brophy, C M; Beer, I; Eagle, S

    2017-12-01

    The assessment of intravascular volume status remains a challenge for clinicians. Peripheral i.v. analysis (PIVA) is a method for analysing the peripheral venous waveform that has been used to monitor volume status. We present a proof-of-concept study for evaluating the efficacy of PIVA in detecting changes in fluid volume. We enrolled 37 hospitalized patients undergoing haemodialysis (HD) as a controlled model for intravascular volume loss. Respiratory rate (F0) and pulse rate (F1) frequencies were measured. PIVA signal was obtained by fast Fourier analysis of the venous waveform followed by weighing the magnitude of the amplitude of the pulse rate frequency. PIVA was compared with peripheral venous pressure and standard monitoring of vital signs. Regression analysis showed a linear correlation between volume loss and change in the PIVA signal (R2=0.77). Receiver operator curves demonstrated that the PIVA signal showed an area under the curve of 0.89 for detection of 20 ml kg-1 change in volume. There was no correlation between volume loss and peripheral venous pressure, blood pressure or pulse rate. PIVA-derived pulse rate and respiratory rate were consistent with similar numbers derived from the bio-impedance and electrical signals from the electrocardiogram. PIVA is a minimally invasive, novel modality for detecting changes in fluid volume status, respiratory rate and pulse rate in spontaneously breathing patients with peripheral i.v. cannulas. © The Author 2017. Published by Oxford University Press on behalf of the British Journal of Anaesthesia. All rights reserved. For Permissions, please email: journals.permissions@oup.com

  8. Iodine status and its correlations with age, blood pressure, and thyroid volume in South Indian women above 35 years of age (Amrita Thyroid Survey

    Directory of Open Access Journals (Sweden)

    Vadayath Usha Menon

    2011-01-01

    Full Text Available Background: Thyroid disorders are more commonly seen among females and the prevalence increases with age. There is no population data from India focusing on iodine levels and their correlations with thyroid volume and other factors in adult women. Aim: This study was designed to establish the iodine status and its relation with various factors including thyroid volume measured by ultrasound among the females of Kerala. Materials and Methods: This was a cross sectional house to house survey among the females above 35 years of age in a randomly selected urban area in Cochin Corporation, Kerala State, India. Selected subjects were interviewed, examined and blood and urine tests were done. Thyroid volume was calculated using ultrasound. Results: Among the 508 subjects who participated in the checkup, 471 subjects were included for analysis. Mean age was 50.3 + 10.7 years and 53.2% were postmenopausal. A total of 98% of the subjects were using iodized salt and median urinary iodine excretion (UIE was 162.6 mcg/l. UIE had negative correlation with age and systolic blood pressure (BP, but had no correlation with thyroid volume (TV, thyroid nodularity, free thyroxine 4 (FT4, thyroid stimulating hormone (TSH or anti thyroid peroxidase (TPO levels. Iodine deficiency was more commonly seen in subjects with hypertension and also among postmenopausal females. Conclusions: This study showed that females > 35 years were iodine sufficient, though one third of the subjects had UIE levels less than the recommended level. Iodine levels had significant negative correlation with age and systolic BP and no correlation with thyroid volume or biochemical parameters. Iodine deficiency was significantly higher in subjects with new and known hypertension and this relation merits further evaluation.

  9. [Birth weight and later nutritional status, cognitive development and job status: a critical revision].

    Science.gov (United States)

    Villegas, S; Ivanovic, R; Pérez, H; Almagià, A; Urrutia, M S; Rodríguez, M del P; Larrain, C; Ivanovic, D

    2009-12-01

    The impact of prenatal nutritional status, assessed through birth weight (BW) and their effects in the short, medium and long-term on nutritional status, cognitive development and job status in the adult life, has been a problem of interest for several researchers; as regards, some of these report a positive and significant association between these variables and others do not find any relation. Children with insufficient, low or very low BW despite the early more deteriorate nutritional status should present higher risk for brain maturation, failure cognitive development and lowered head circumference which implies both lowered brain volume and intellectual development. In the short and medium-term, this situation damages the learning process at school-age, while in the long-term this might condition the quality of jobs. At present, the body of knowledge pinpoints that findings related to these associations is not conclusive verifying a great controversy in these matters. This review article has the purpose of analyzing the current evidence, in order to stimulate research about to these aspects which are relevant for child development and their future life.

  10. Waste minimization handbook, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Boing, L.E.; Coffey, M.J.

    1995-12-01

    This technical guide presents various methods used by industry to minimize low-level radioactive waste (LLW) generated during decommissioning and decontamination (D and D) activities. Such activities generate significant amounts of LLW during their operations. Waste minimization refers to any measure, procedure, or technique that reduces the amount of waste generated during a specific operation or project. Preventive waste minimization techniques implemented when a project is initiated can significantly reduce waste. Techniques implemented during decontamination activities reduce the cost of decommissioning. The application of waste minimization techniques is not limited to D and D activities; it is also useful during any phase of a facility`s life cycle. This compendium will be supplemented with a second volume of abstracts of hundreds of papers related to minimizing low-level nuclear waste. This second volume is expected to be released in late 1996.

  11. Waste minimization handbook, Volume 1

    International Nuclear Information System (INIS)

    Boing, L.E.; Coffey, M.J.

    1995-12-01

    This technical guide presents various methods used by industry to minimize low-level radioactive waste (LLW) generated during decommissioning and decontamination (D and D) activities. Such activities generate significant amounts of LLW during their operations. Waste minimization refers to any measure, procedure, or technique that reduces the amount of waste generated during a specific operation or project. Preventive waste minimization techniques implemented when a project is initiated can significantly reduce waste. Techniques implemented during decontamination activities reduce the cost of decommissioning. The application of waste minimization techniques is not limited to D and D activities; it is also useful during any phase of a facility's life cycle. This compendium will be supplemented with a second volume of abstracts of hundreds of papers related to minimizing low-level nuclear waste. This second volume is expected to be released in late 1996

  12. Evaluation of nuclear facility decommissioning projects. Three Mile Island Unit 2. Radioactive waste and laundry shipments. Volume 9. Summary status report

    International Nuclear Information System (INIS)

    Doerge, D.H.; Miller, R.L.; Scotti, K.S.

    1986-05-01

    This document summarizes information concerning radioactive waste and laundry shipments from the Three Mile Island Nuclear Station Unit 2 to radioactive waste disposal sites and to protective clothing decontamination facilities (laundries) since the loss of coolant accident experienced on March 28, 1979. Data were collected from radioactive shipment records, summarized, and placed in a computerized data information retrieval/manipulation system which permits extraction of specific information. This report covers the period of April 9, 1979 to May 5, 1985. Included in this report are: waste disposal site locations, dose rates, curie content, waste description, container type and number, volumes and weights. This information is presented in two major categories: protective clothing (laundry) and radioactive waste. Each of the waste shipment reports is in chronological order

  13. Brookhaven National Laboratory 2008 Site Environment Report Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Brookhaven National Laboratory

    2009-10-01

    Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy. The report is written to inform the public, regulators, employees, and other stakeholders of the Laboratory's environmental performance during the calendar year in review. Volume I of the SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and performance in restoration and surveillance monitoring programs. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. Volume II of the SER, the Groundwater Status Report, also is prepared annually to report on the status of and evaluate the performance of groundwater treatment systems at the Laboratory. Volume II includes detailed technical summaries of groundwater data and its interpretation, and is intended for internal BNL users, regulators, and other technically oriented stakeholders. A brief summary of the information contained in Volume II is included in this volume in Chapter 7, Groundwater Protection. Both reports are available in print and as downloadable files on the BNL web page at http://www.bnl.gov/ewms/ser/. An electronic version on compact disc is distributed with each printed report. In addition, a summary of Volume I is prepared each year to provide a general overview of the report, and is distributed with a compact disc containing the full report.

  14. Fermilab ACP multi-microprocessor project

    International Nuclear Information System (INIS)

    Gaines, I.; Areti, H.; Biel, J.; Bracker, S.; Case, G.; Fischler, M.; Husby, D.; Nash, T.

    1984-08-01

    We report on the status of the Fermilab Advanced Computer Program's project to provide more cost-effective computing engines for the high energy physics community. The project will exploit the cheap, but powerful, commercial microprocessors now available by constructing modular multi-microprocessor systems. A working test bed system as well as plans for the next stages of the project are described

  15. Volume and mass measurements of liquids

    International Nuclear Information System (INIS)

    Zander, M.

    1987-12-01

    The report comprises the 10 lectures given at the 74th PTB seminar, which represent the state of the art in the field of liquid flow measurement. The lectures deal with the overflow-pipette as the primary volume standard of PTB, gas elimination devices (compulsory in measuring assemblies with volume meters), measuring assemblies for the reception of milk, electromagnetic flowmeters, vortex-shedding meters, indirect mass measurement from volume and density, direct mass measurement (coriolis flowmeters), pipeline-measurements, level measurement at storage tanks with conventional and optical methods and a development aid project for the set up of test rigs in India. (orig.) [de

  16. An innovative method of planning and displaying flap volume in DIEP flap breast reconstructions.

    Science.gov (United States)

    Hummelink, S; Verhulst, Arico C; Maal, Thomas J J; Hoogeveen, Yvonne L; Schultze Kool, Leo J; Ulrich, Dietmar J O

    2017-07-01

    Determining the ideal volume of the harvested flap to achieve symmetry in deep inferior epigastric artery perforator (DIEP) flap breast reconstructions is complex. With preoperative imaging techniques such as 3D stereophotogrammetry and computed tomography angiography (CTA) available nowadays, we can combine information to preoperatively plan the optimal flap volume to be harvested. In this proof-of-concept, we investigated whether projection of a virtual flap planning onto the patient's abdomen using a projection method could result in harvesting the correct flap volume. In six patients (n = 9 breasts), 3D stereophotogrammetry and CTA data were combined from which a virtual flap planning was created comprising perforator locations, blood vessel trajectory and flap size. All projected perforators were verified with Doppler ultrasound. Intraoperative flap measurements were collected to validate the determined flap delineation volume. The measured breast volume using 3D stereophotogrammetry was 578 ± 127 cc; on CTA images, 527 ± 106 cc flap volumes were planned. The nine harvested flaps weighed 533 ± 109 g resulting in a planned versus harvested flap mean difference of 5 ± 27 g (flap density 1.0 g/ml). In 41 out of 42 projected perforator locations, a Doppler signal was audible. This proof-of-concept shows in small numbers that flap volumes can be included into a virtual DIEP flap planning, and transferring the virtual planning to the patient through a projection method results in harvesting approximately the same volume during surgery. In our opinion, this innovative approach is the first step in consequently achieving symmetric breast volumes in DIEP flap breast reconstructions. Copyright © 2017 British Association of Plastic, Reconstructive and Aesthetic Surgeons. Published by Elsevier Ltd. All rights reserved.

  17. Extended Excluded Volume: Its Origin and Consequences

    Czech Academy of Sciences Publication Activity Database

    Nezbeda, Ivo; Rouha, M.

    2013-01-01

    Roč. 85, č. 1 (2013), s. 201-210 ISSN 0033-4545. [International Conference on Solution Chemistry (ICSC-32) /32./. La Grande Motte, 28.08.2011-02.09.2011] R&D Projects: GA AV ČR IAA400720802 Institutional support: RVO:67985858 Keywords : excluded volume * partial molar volume * primitive models Subject RIV: CF - Physical ; Theoretical Chemistry Impact factor: 3.112, year: 2013

  18. Project management in the library workplace

    CERN Document Server

    Daugherty, Alice

    2018-01-01

    This volume of Advances in Library Administration and Organization attempts to put project management into the toolboxes of library administrators through overviews of concepts, analyses of experiences, and forecasts for the use of project management within the profession.

  19. A comprehensive inventory of radiological and nonradiological contaminants in waste buried or projected to be buried in the subsurface disposal area of the INEL RWMC during the years 1984-2003, Volume 2

    International Nuclear Information System (INIS)

    1995-05-01

    This is the second volume of this comprehensive report of the inventory of radiological and nonradiological contaminants in waste buried or projected to be buried in the subsurface disposal area of the Idaho National Engineering Laboratory. Appendix B contains a complete printout of contaminant inventory and other information from the CIDRA Database and is presented in volumes 2 and 3 of the report

  20. Project Rio Blanco: site restoration. Final report

    International Nuclear Information System (INIS)

    1978-01-01

    Project Rio Blanco was a joint Government-industry experiment using nuclear explosives to stimulate the flow of natural gas from low permeability formations which could not be economically produced through conventional methods. The project consisted of the simultaneous detonation of three nuclear explosives on May 17, 1973, in a 7,000 foot well in northwestern Colorado. Gas production testing and project evaluation continued through June 1976. The site cleanup and restoration planning phase began in December 1975 and was concluded with the issuance of an operational plan, Project Rio Blanco Site Cleanup and Restoration Plan, NVO-173, in May 1976. Actual site restoration activities were conducted during the period from July to November 1976. The activities throughout the restoration period are summarized and the final site status, including the disposition of all project facilities and the status of all project related wells after plug and abandonment and recompletion work are described

  1. The low energy booster project status

    International Nuclear Information System (INIS)

    Tuttle, G.W.

    1993-05-01

    In order to achieve the required injection momentum, the Superconducting Super Collider (SSC) has an accelerator chain comprised of a Linear Accelerator and three synchrotrons. The Low Energy Booster (LEB) is the first synchrotron in this chain. The LEB project has made significant progress in the development of major subsystems and conventional construction. This paper briefly reviews the performance requirements of the LEB and describes significant achievements in each of the major subsystem areas. Highlighted among these achievements are the LEB foreign collaborations with the Budker Institute of Nuclear Physics (BINP) located in Novosibirsk, Russia

  2. Progress, status, and plans for the HRIBF project

    International Nuclear Information System (INIS)

    Auble, R.L.; Alton, G.D.; Bailey, J.D.

    1995-01-01

    Over the last three years, the Holifield accelerator system has been reconfigured into a first-generation radioactive ion beam facility, the HRIBF, a national user facility for RIB research. The construction and reconfiguration have been completed and the equipment commissioning and beam development phases have started. The progress to date, the present status, and future plans will be given. The special problems connected with the production and acceleration of RIBs will be discussed

  3. Status of the Forward Physics Projects in ATLAS

    OpenAIRE

    Ask, Stefan

    2007-01-01

    The ATLAS experiment at the LHC is building several detector systems for forward physics studies and to determine the luminosity. The main forward systems consist of a Cerenkov detector called LUCID, a Zero Degree Calorimeter (ZDC) and Roman Pots which will house a scintillating fiber tracker system called ALFA. Here we report some of the forward physics activities that are foreseen in ATLAS together with the status of the related detector systems.

  4. Radiological status of the Saint-Pierre (Cantal) uranium mine and of its environment. Volume 1 + volume 2 + volume 3

    International Nuclear Information System (INIS)

    2006-01-01

    The first volume reports detailed investigations performed by the CRIIRAD (sampling and radiological controls of sediments, and more particularly of waters and aquatic plants) in different areas about the Saint-Pierre uranium mine in France (Cantal department). Measurements were performed by gamma spectrometry. The second part concerns external exposure and the radiological characterization of soils. The third part reports the study of the presence of radon in outdoor and indoor air. For each of these aspects, methodological information is given as well as a great quantity of measurement results

  5. Western Gas Sands Project. Status report, 1 August-31 August, 1979

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    This status report summarizes progress of government-sponsored projects directed toward increasing gas production from the low-permeability gas sands of the western United States. Work on fracture conductivity, rock-fluid interaction, and log evaluation and interpretation techniques continued at Bartlesville. Work commenced on completing, testing and possible hydraulic fracturing of the Rio Blanco Natural Gas Company well No. 397-19-1 and on the evaluation of seismic data for stratigraphic studies of lenticular sands. LLL continued experimental and theoretical work on hydraulic fracturing mechanics and analysis of well test data. LASL worked on developing NMR methods to define fluid saturation, porosity, and permeability of western gas sands at in situ conditions. M.D. Wood, Inc. was involved in design and site preparation for two hydraulic fracture mapping jobs in the Cotton Valley Trend in Texas. Testing and analyses of the borehole seismic system and borehole hydrophone system continued at Sandia. Field tests and related activities for the WGSP progressed as scheduled in August. Cyclic injection of dehydrated natural gas and production in Colorado Interstate Gas Company's Miller No. 1 and Sprague No. 1 wells continued. The Gas Producing Enterprises, Inc. wells, Natural Buttes Units 9, 14, 18 and 20 flowed to sales. The Mitchell Energy Corporation Muse-Duke No. 1 was shut-in for a 15-day pressure buildup test. Hydraulic fracture containment experiments and activities in the multi-frac test series continued at the Nevada Test Site for Sandia Laboratories' mineback program.

  6. Status of the project of Novosibirsk high power FEL

    Energy Technology Data Exchange (ETDEWEB)

    Pinayev, I.V.; Erg, G.I.; Gavrilov, N.G. [Budker Institute of Nuclear Physics, Novosibirsk (Russian Federation)] [and others

    1995-12-31

    The project of IR FEL for the Siberian Center of photochemical researches is described. The distinguished features of this project are the use of the race-track microtron-recuperator and the {open_quotes}electron output of radiation{close_quotes}. The building for the machine is under reconstruction now. About half of hardware has been manufactured. The assembly of installation began.

  7. The EFF Project Status and the NEA Nuclear Data Services

    International Nuclear Information System (INIS)

    Henriksson, H.; Kodeli, I.; Nordborg, C.; Forrest, R.; Batistoni, P.; Fischer, U.

    2006-01-01

    The OECD Nuclear Energy Agency (NEA) Data Bank is part of an international network of data centres in charge of the compilation and dissemination of basic nuclear data. Through its activities in the reaction data field, the NEA participates in the production of data and their distribution to its users. The NEA Data Bank administrates the collection and validation as well as the distribution of the Joint Evaluated Fusion and Fission (JEFF) library. The JEFF project has evolved from two separate projects, namely the European Fusion File (EFF) and the Joint Evaluated File (JEF), to JEFF with the latest release of the library, JEFF-3.1, in May 2005. The EFF Project is a collaborative project with work funded by the European Fusion Development Agreement (EFDA). The tasks within the project comprise new data evaluation and verification of activation and transport data, calculation methods and validation via integral experiments. The EFF project brings together all available expertise in Europe, relating to the nuclear data requirements of existing and future fusion devices. EFF contributed greatly to the successful release of the internationally recognised nuclear data library JEFF-3.1. The NEA Working Party on International Nuclear Data Evaluation Co-operation (WPEC) is established to promote the exchange of information on nuclear data evaluations, measurements, nuclear model calculations and validation. WPEC provides a framework for co-operative activities between the participating projects, such as the high priority request list that is a collection of experimental data requests of special interest in a certain project, such as JEFF or ITER. The NEA provides also computer program services for nuclear energy and radiation physics applications. Of special interest for fusion applications are the integral experiments, such as SINBAD, with radiation shielding and dosimetry experiments including many fusion neutronics shielding experiments. (author)

  8. Benefits of fish passage and protection measures at hydroelectric projects

    International Nuclear Information System (INIS)

    Cada, G.F.; Jones, D.W.

    1993-01-01

    The US Department of Energy's Hydropower Program is engaged in a multi-year study of the costs and benefits of environmental mitigation measures at nonfederal hydroelectric power plants. An initial report (Volume 1) reviewed and surveyed the status of mitigation methods for fish passage, instream flows, and water quality; this paper focuses on the fish passage/protection aspects of the study. Fish ladders were found to be the most common means of passing fish upstream; elevators/lifts were less common, but their use appears to be increasing. A variety of mitigative measures is employed to prevent fish from being drawn into turbine intakes, including spill flows, narrow-mesh intake screens, angled bar racks, and lightor sound-based guidance measures. Performance monitoring and detailed, quantifiable performance criteria were frequently lacking at non-federal hydroelectric projects. Volume 2 considers the benefits and costs of fish passage and protection measures, as illustrated by case studies for which performance monitoring has been conducted. The report estimates the effectiveness of particular measures, the consequent impacts on the fish populations that are being maintained or restored, and the resulting use and non-use values of the maintained or restored fish populations

  9. J-PARC project

    International Nuclear Information System (INIS)

    Nagamiya, Shoji

    2004-01-01

    From Japanese fiscal year JFY01, which started on April 1, 2001, a new accelerator project to provide high-intensity proton beams proceeded into its construction phase. This project, which is now called the Japan Proton Accelerator Research Complex (J-PARC) project, is conducted under a cooperation of two institutions, KEK and Japan Atomic Energy Research Institution. We set a goal to achieve 1 MW proton beams at 3 GeV and 0.75 MW beams at 50 GeV. The project will be completed within six years, with the anticipated first beams in the spring of 2007. In this article I will describe (a) the project itself, (b) sciences to be pursued at this new accelerator complex and (c) the present status and future plans of the project

  10. Medical Data Architecture (MDA) Project Status

    Science.gov (United States)

    Krihak, M.; Middour, C.; Gurram, M.; Wolfe, S.; Marker, N.; Winther, S.; Ronzano, K.; Bolles, D.; Toscano, W.; Shaw, T.

    2018-01-01

    The Medical Data Architecture (MDA) project supports the Exploration Medical Capability (ExMC) risk to minimize or reduce the risk of adverse health outcomes and decrements in performance due to in-flight medical capabilities on human exploration missions. To mitigate this risk, the ExMC MDA project addresses the technical limitations identified in ExMC Gap Med 07: We do not have the capability to comprehensively process medically-relevant information to support medical operations during exploration missions. This gap identifies that the current in-flight medical data management includes a combination of data collection and distribution methods that are minimally integrated with on-board medical devices and systems. Furthermore, there are a variety of data sources and methods of data collection. For an exploration mission, the seamless management of such data will enable a more medically autonomous crew than the current paradigm. The medical system requirements are being developed in parallel with the exploration mission architecture and vehicle design. ExMC has recognized that in order to make informed decisions about a medical data architecture framework, current methods for medical data management must not only be understood, but an architecture must also be identified that provides the crew with actionable insight to medical conditions. This medical data architecture will provide the necessary functionality to address the challenges of executing a self-contained medical system that approaches crew health care delivery without assistance from ground support. Hence, the products supported by current prototype development will directly inform exploration medical system requirements.

  11. Krsko 2 Project Preparation and Status

    International Nuclear Information System (INIS)

    Novsak, M.; Spiler, J.; Bergant, R.; Zagar, T.

    2008-01-01

    The Government of the Republic of Slovenia has adopted a document 'Resolution on National Development Projects for the period 2007 - 2023' in October 2006. Among several projects which all support sustainable development of Slovenia, an option of a new nuclear power plant was proposed. Thus, the Slovenian Government showed obvious intention and direction of Slovenian future energetic situation. The supply of electricity has been sharpening in Slovenia in the last few years. Growing of gross domestic product (GDP) and approaching to the life standard of developed EU countries has caused increased consumption of electricity. Since domestic electricity production does not follow the increased consumption, Slovenia already imports nearly a quarter of its needed electricity. Slovenia would need 400 MW of installed electrical power now for covering of its base load needs only. Based on recent electricity consumption forecasts, Slovenia will need 800 MW of new electricity generation capacities by 2015 and 1500 MW by 2025 respectively. Besides high annual growth rate and high dependence on electricity import, a problem of relatively old power generation objects and realization of new energy and climate package for Europe exists. All together dictates our options for expansion of capacity production of the proposed Nuclear power plant Krsko 2. Experience and knowledge of light water pressurized reactor can be effectively used at NPP Krsko 2. Planned NPP Krsko 2 would have between 1100 and 1600 MW of installed electrical power. If the decision is taken in 2009, construction could start in 2013 and finish in 2017. (author)

  12. ACARP Project C10059. ACARP manual of modern coal testing methods. Volume 2: Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Sakurovs, R.; Creelman, R.; Pohl, J.; Juniper, L. [CSIRO Energy Technology, Sydney, NSW (Australia)

    2002-07-01

    The Manual summarises the purpose, applicability, and limitations of a range of standard and modern coal testing methods that have potential to assist the coal company technologist to better evaluate coal performance. It is presented in two volumes. This second volume provides more detailed information regarding the methods discussed in Volume 1.

  13. Flat-plate solar array project. Volume 1: Executive summary

    Science.gov (United States)

    Callaghan, W.; Mcdonald, R.

    1986-01-01

    In 1975, the U.S. Government contracted the Jet Propulsion Lab. to develop, by 1985, in conjunction with industry, the photovoltaics (PV) module and array technology required for widespread use of photovoltaics as a significant terrestrial energy source. As a result, a project that eventually became known as the Flat Plate Solar Array (FSA) Project was formed to manage an industry, university, and Government team to perform the necessary research and development. The original goals were to achieve widespread commercial use of PV modules and arrays through the development of technology that would allow them to be profitably sold for $1.07/peak watts (1985 dollars). A 10% module conversion efficiency and a 20 year lifetime were also goals. It is intended that the executive summary provide the means by which one can gain a perspective on 11 years of terrestrial photovoltaic research and development conducted by the FSA Project.

  14. Greater-than-Class C low-level radioactive waste characterization: Estimated volumes, radionuclide activities, and other characteristics

    International Nuclear Information System (INIS)

    Hulse, R.A.

    1991-08-01

    Planning for storage or disposal of greater-than-Class C low-level radioactive waste (GTCC LLW) requires characterization of that waste to estimate volumes, radionuclide activities, and waste forms. Data from existing literature, disposal records, and original research were used to estimate the characteristics and project volumes and radionuclide activities to the year 2035. GTCC LLW is categorized as: nuclear utilities waste, sealed sources waste, DOE-held potential GTCC LLW; and, other generator waste. It has been determined that the largest volume of those wastes, approximately 57%, is generated by nuclear power plants. The Other Generator waste category contributes approximately 10% of the total GTCC LLW volume projected to the year 2035. Waste held by the Department of Energy, which is potential GTCC LLW, accounts for nearly 33% of all waste projected to the year 2035; however, no disposal determination has been made for that waste. Sealed sources are less than 0.2% of the total projected volume of GTCC LLW

  15. MANHATTAN DISTRICT HISTORY PROJECT Y THE LOS ALAMOS PROJECT VOL. II AUGUST 1945 THROUGH DECEMBER 1946

    Energy Technology Data Exchange (ETDEWEB)

    Truslow, E. C.; Smith, R. C.

    1961-12-01

    THESE TWO VOLUMES CONSTITUTE A RECORD OF THE TECHNICAL, ADMINISTRATIVE , AND POLICY-MAKING ACTIVITIES OF THE LOS ALAMOS PROJECT (PROJECT Y) FROM ITS INCEPTION UNDER THE MANHATTAN DISTRICT THROUGH THE DEVELOPMENT OF THE ATOMIC BOMB (VOL. I), AND DURING THE PERIOD FOLLOWING THE END OF WORLD WAR II UNTIL THE MANHATTAN DISTRICT RELINQUISHED CONTROL TO THE ATOMIC ENERGY COMMISSION AS OF JANUARY 1947 (VOL. II). ALTHOUGH SEC URITY REGULATIONS HAVE REQUIRED SOME DELETIONS IN THE ORIGINAL TEXT OF THE TWO VOLUMES, EVERY EFFORT HAS BEEN MADE TO RETAIN THE ORIGINAL LANGUGAGE AND EXPERSSIONS OF THE AUTHORS.

  16. LLCEDATA and LLCECALC for Windows version 1.0, Volume 1: User's manual

    International Nuclear Information System (INIS)

    McFadden, J.G.

    1998-01-01

    LLCEDATA and LLCECALC for Windows are user-friendly computer software programs that work together to determine the proper waste designation, handling, and disposition requirements for Long Length Contaminated Equipment (LLCE). LLCEDATA reads from a variety of data bases to produce an equipment data file (EDF) that represents a snapshot of both the LLCE and the tank it originates from. LLCECALC reads the EDF and a gamma assay (AV2) file that is produced by the Flexible Receiver Gamma Energy Analysis System. LLCECALC performs corrections to the AV2 file as it is being read and characterizes the LLCE. Both programs produce a variety of reports, including a characterization report and a status report. The status report documents each action taken by the user, LLCEDATA, and LLCECALC. Documentation for LLCEDATA and LLCECALC for Windows is available in three volumes. Volume 1 is a user's manual, which is intended as a quick reference for both LLCEDATA and LLCECALC. Volume 2 is a technical manual, and Volume 3 is a software verification and validation document

  17. Status of glueball mass calculations in lattice gauge theory

    International Nuclear Information System (INIS)

    Kronfeld, A.S.

    1989-11-01

    The status of glueball spectrum calculations in lattice gauge theory is briefly reviewed, with focus on the comparison between Monte Carlo simulations and small-volume analytical calculations in SU(3). The agreement gives confidence that the large-volume Monte Carlo results are accurate, at least in the context of the pure gauge theory. An overview of some of the technical questions, which is aimed at non-experts, serves as an introduction. 19 refs., 1 fig

  18. The SMILING project

    DEFF Research Database (Denmark)

    Berger, Jacques; Blanchard, Gentiane; Ponce, Maiza Campos

    2013-01-01

    The "Sustainable Micronutrient Interventions to Control Deficiencies and Improve Nutritional Status and General Health in Asia" project (SMILING), funded by the European Commission, is a transnational collaboration of research institutions and implementation agencies in five Southeast Asian count...

  19. Inventory of Federal energy-related environment and safety research for FY 1978. Volume 1. Executive summary

    International Nuclear Information System (INIS)

    1979-12-01

    The FY 1978 Federal Inventory is a compilation of 3225 federally funded energy-related environmental and safety reserch projects. It consists of three volumes: an executive summary providing an overview of the data (Volume I), a catalog listing each Inventory project followed by series of indexes (Volume II), and an interactive terminal guide giving instructions for on-line data retrieval (Volume III). Volume I reviews the inventory data as a whole and also within each of three major categories: biomedical and environmental research, environmental control technology research, and operational safety research

  20. 40 CFR 197.31 - What is a representative volume?

    Science.gov (United States)

    2010-07-01

    ... supply a given water demand. The DOE must project the concentration of radionuclides released from the... Public Health and Environmental Standards for Disposal Ground Water Protection Standards § 197.31 What is a representative volume? (a) It is the volume of ground water that would be withdrawn annually from...

  1. Current Status and Prediction on Development of PE Market

    Institute of Scientific and Technical Information of China (English)

    Yu Jiao

    2003-01-01

    This article comprehensively analyzes the status of market demand/supply and import/export volumes of PE in the world and in China, and predicts the future development trends in the fields of PE production and consumption.

  2. Business Intelligence Support For Project Management

    OpenAIRE

    Muntean, Mihaela; Cabau, Liviu Gabiel

    2013-01-01

    With respect to the project management framework, a project live cycle consists of phases like: initiation, planning, execution, monitoring & control and closing. Monitoring implies measuring the progress and performance of the project during its execution and communicating the status. Actual performance is compared with the planned one. Therefore, a minimal set of key performance indicators will be proposed. Monitoring the schedule progress, the project budget and the scope will be possible....

  3. Pediatric blood volumes: a one-page reference guide.

    Science.gov (United States)

    Smiley, J; Reitan, J

    1998-10-01

    At our institution, a multidisciplinary team met to work out a blood volume policy for our pediatric patients' laboratory testing. Because we are a cancer center, many of our patients are on protocols and/or are in the hospital for an extended period of time. These factors result in multiple blood draws. It is important to manage the volumes used so that we do not compromise the hematological status of our pediatric patients. The concerns of nurses and laboratory technologists were discussed and a three-tiered system was designed consisting of adult volumes, volumes for inflexibility to verify or add to the original order without resticking the patient increase at each tier. It is imperative to the overall quality of care for all patients that discretion is used when following these guidelines. When it is medically prudent to restrict the blood volumes taken from any patient, it should be done. However, when it is not medically necessary, the increased costs and potential decrease in the quality of laboratory service outweighs the desire to use smaller blood volumes.

  4. Photoacoustic projection imaging using an all-optical detector array

    Science.gov (United States)

    Bauer-Marschallinger, J.; Felbermayer, K.; Berer, T.

    2018-02-01

    We present a prototype for all-optical photoacoustic projection imaging. By generating projection images, photoacoustic information of large volumes can be retrieved with less effort compared to common photoacoustic computed tomography where many detectors and/or multiple measurements are required. In our approach, an array of 60 integrating line detectors is used to acquire photoacoustic waves. The line detector array consists of fiber-optic MachZehnder interferometers, distributed on a cylindrical surface. From the measured variation of the optical path lengths of the interferometers, induced by photoacoustic waves, a photoacoustic projection image can be reconstructed. The resulting images represent the projection of the three-dimensional spatial light absorbance within the imaged object onto a two-dimensional plane, perpendicular to the line detector array. The fiber-optic detectors achieve a noise-equivalent pressure of 24 Pascal at a 10 MHz bandwidth. We present the operational principle, the structure of the array, and resulting images. The system can acquire high-resolution projection images of large volumes within a short period of time. Imaging large volumes at high frame rates facilitates monitoring of dynamic processes.

  5. Savannah River Site Approved Site Treatment Plan, 2001 Annual Update (Volumes I and II)

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence, B.

    2001-04-30

    The Compliance Plan Volume (Volume I) identifies project activity scheduled milestones for achieving compliance with Land Disposal Restrictions. Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information.

  6. Projecting Timber Inventory at the Product Level

    Science.gov (United States)

    Lawrence Teeter; Xiaoping Zhou

    1999-01-01

    Current timber inventory projections generally lack information on inventory by product classes. Most models available for inventory projection and linked to supply analyses are limited to projecting aggregate softwood and hardwood. The research presented describes a methodology for distributing the volume on each FIA (USDA Forest Service Forest Inventory and Analysis...

  7. Status seminar `98: Solar-supported district heating with seasonal heat storage. Status report `98; Status-Seminar `98: Solarunterstuetzte Nahwaermeversorgung - Saisonale Waermespeicherung. Statusbericht `98

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-31

    This status report refers to the BMBF (Federal Ministry for Education, Science, Research and Technology) status seminar: Solar-assisted district heat supply - seasonal heat storage that took place in Neckarsulm on 19th and 20th May. 1998. The report contains the reference papers and the status reports of all projects supported under the Ministry`s SOLARTHERMIE programme that have already been finished or are still running. (orig.) [Deutsch] Der vorliegende Statusbericht wird anlaesslich des BMBF-Statusseminars: Solarunterstuetzte Nahwaermeversorgung - Saisonale Waermespeicherung am 19. und 20. Mai 1998 in Neckarsulm herausgegeben. Der Bericht enthaelt neben den Tagungsbeitraegen auch die Sachstandsberichte aller Projekte, die zu diesem Thema in den letzten Jahren von BMBF in dem Programm SOLARTHERMIE-2000 bereits abgeschlossen wurden oder z.Zt. gefoerdert werden. (orig.)

  8. Status of the ATLAS Positive-Ion Injector Project

    International Nuclear Information System (INIS)

    Pardo, R.C.; Benaroya, R.; Billquist, P.J.

    1987-01-01

    The goal of the Argonne Positive Ion Injector project is to replace the ATLAS tandem injector with a facility which will increase the beam currents presently available by a factor of 100 and to make available at ATLAS essentially all beams including uranium. The beam quality expected from the facility will be at least as good as that of the tandem based ATLAS. The project combines two relatively new technologies - the electron cyclotron resonance ion source, which provides high charge state ions at microampere currents, and RF superconductivity which has been shown to be capable of generating accelerating fields as high as 10 MV/m, resulting in an essentially new method of acceleration for low-energy heavy ions. 5 refs., 7 figs., 1 tabs

  9. Working conditions of female part-time and full-time teachers in relation to health status.

    Science.gov (United States)

    Seibt, Reingard; Matz, Annerose; Hegewald, Janice; Spitzer, Silvia

    2012-08-01

    Teacher's volume of employment and health status are controversially discussed in the current literature. This study focused on female teachers with part-time versus full-time jobs in association with working conditions and health status depending on age. A sample of 263 part-time and 367 full-time female teachers (average age 46.7 ± 7.8 vs. 46.0 ± 6.3) participated in an occupational health screening. Specific work conditions, stressors (job history-questionnaire) and effort-reward-imbalance ratio (ERI-Q) were measured and their relationships to mental and physical health were analysed. Health status was quantified by complaints (BFB questionnaire), general mental health status (GHQ-12) and cardiovascular risk factors. On average, teachers in part-time positions reported 36 and in full-time positions 42 h per week. The effort-reward ratios were significantly associated with the volume of employment. Teachers in part-time jobs had only a slightly lower ERI-ratio. There were no differences between full-time and part-time teachers regarding health status. Eighteen percentage of both groups reported impaired mental health (GHQ ≥ 5), 48% of part-time teachers and 53% of full-time teachers suffered from high blood pressure. Low physical fitness was observed in 12% of part-time and 6% of full-time teachers. In this study, neither the volume of employment nor working conditions were found to be significantly correlated with health status. Part-time and full-time employment status did not appear to influence health in the teaching profession. Although there are differences in quantitative working demands, while the health status does not differ between both teacher groups.

  10. Idaho National Engineering Laboratory Waste Area Groups 1-7 and 10 Technology Logic Diagram. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    O`Brien, M.C.; Meservey, R.H.; Little, M.; Ferguson, J.S.; Gilmore, M.C.

    1993-09-01

    The Idaho National Engineering Laboratory (INEL) Technology Logic Diagram (TLD) was developed to provide a decision support tool that relates Environmental Restoration (ER) and Waste Management (WM) problems at the INEL to potential technologies that can remediate these problems. The TLD identifies the research, development, demonstration, testing, and evaluation needed to develop these technologies to a state that allows technology transfer and application to an environmental restoration need. It is essential that follow-on engineering and system studies be conducted to build on the output of this project. These studies will begin by selecting the most promising technologies identified in this TLD and finding an optimum mix of technologies that will provide a socially acceptable balance between cost and risk to meet the site windows of opportunity. The TLD consists of three separate volumes: Volume I includes the purpose and scope of the TLD, a brief history of the INEL Waste Area Groups, and environmental problems they represent. A description of the TLD, definitions of terms, a description of the technology evaluation process, and a summary of each subelement, is presented. Volume II (this volume) describes the overall layout and development of the TLD in logic diagram format. This section addresses the environmental restoration of contaminated INEL sites. Specific INEL problem areas/contaminants are identified along with technology solutions, the status of the technologies, precise science and technology needs, and implementation requirements. Volume III provides the Technology Evaluation Data Sheets (TEDS) for Environmental Restoration and Waste Management (EM) activities that are referenced by a TEDS codenumber in Volume II. Each of these sheets represents a single logic trace across the TLD. These sheets contain more detail than provided for technologies in Volume II.

  11. Site Environmental Report for 1999 - Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Ruggieri, M

    2000-08-12

    Each year, Ernest Orlando Lawrence Berkeley National Laboratory prepares an integrated report on its environmental programs to satisfy the requirements of United States Department of Energy Order 231.1. The Site Environmental Report for 1999 is intended to summarize Berkeley Lab's compliance with environmental standards and requirements, characterize environmental management efforts through surveillance and monitoring activities, and highlight significant programs and efforts for calendar year 1999. The report is separated into two volumes. Volume I contains a general overview of the Laboratory, the status of environmental programs, and summary results from surveillance and monitoring activities. Each chapter in Volume I begins with an outline of the sections that follow, including any tables or figures found in the chapter. Readers should use section numbers (e.g., {section}1.5) as navigational tools to find topics of interest in either the printed or the electronic version of the report. Volume II contains the individual data results from monitoring programs.

  12. FRIB Cryogenic Plant Status

    Energy Technology Data Exchange (ETDEWEB)

    Dixon, Kelly D. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Ganni, Venkatarao [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Knudsen, Peter N. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Casagranda, Fabio [Michigan State Univ., East Lansing, MI (United States)

    2015-12-01

    After practical changes were approved to the initial conceptual design of the cryogenic system for MSU FRIB and an agreement was made with JLab in 2012 to lead the design effort of the cryogenic plant, many activities are in place leading toward a cool-down of the linacs prior to 2018. This is mostly due to using similar equipment used at CHLII for the 12 GeV upgrade at JLab and an aggressive schedule maintained by the MSU Conventional Facilities department. Reported here is an updated status of the cryogenic plant, including the equipment procurement status, plant layout, facility equipment and project schedule.

  13. Final Technical Report - Kotzebue Wind Power Project - Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker

    2007-10-31

    The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

  14. Regular Topologies for Gigabit Wide-Area Networks. Volume 1

    Science.gov (United States)

    Shacham, Nachum; Denny, Barbara A.; Lee, Diane S.; Khan, Irfan H.; Lee, Danny Y. C.; McKenney, Paul

    1994-01-01

    In general terms, this project aimed at the analysis and design of techniques for very high-speed networking. The formal objectives of the project were to: (1) Identify switch and network technologies for wide-area networks that interconnect a large number of users and can provide individual data paths at gigabit/s rates; (2) Quantitatively evaluate and compare existing and proposed architectures and protocols, identify their strength and growth potentials, and ascertain the compatibility of competing technologies; and (3) Propose new approaches to existing architectures and protocols, and identify opportunities for research to overcome deficiencies and enhance performance. The project was organized into two parts: 1. The design, analysis, and specification of techniques and protocols for very-high-speed network environments. In this part, SRI has focused on several key high-speed networking areas, including Forward Error Control (FEC) for high-speed networks in which data distortion is the result of packet loss, and the distribution of broadband, real-time traffic in multiple user sessions. 2. Congestion Avoidance Testbed Experiment (CATE). This part of the project was done within the framework of the DARTnet experimental T1 national network. The aim of the work was to advance the state of the art in benchmarking DARTnet's performance and traffic control by developing support tools for network experimentation, by designing benchmarks that allow various algorithms to be meaningfully compared, and by investigating new queueing techniques that better satisfy the needs of best-effort and reserved-resource traffic. This document is the final technical report describing the results obtained by SRI under this project. The report consists of three volumes: Volume 1 contains a technical description of the network techniques developed by SRI in the areas of FEC and multicast of real-time traffic. Volume 2 describes the work performed under CATE. Volume 3 contains the source

  15. The MAJORANA Project: a status report

    Energy Technology Data Exchange (ETDEWEB)

    Elliott, Steven Ray [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-06-09

    This series of slides presents the topic under the following aspects: ββ sensitivity, underground laboratory, shield, monoliths, strings, detectors, electroformed small parts, and background. Assembly and construction are proceeding at Sanford Davis Campus laboratory. Based on assays, material backgrounds are projected to meet cleanliness goals. Module 1 is complete. Electroformed copper has just been completed at SURF and PNNL. The shield is nearly complete. Successful reduction and refinement of enrGe has taken place with 98% yield. AMTEK (ORTEC) has produced 27 kg within 32 detectors from the reduced/refined enrGe; 30 of these are underground at SURF being assembled into strings.

  16. Status of the NICA project at JINR

    Directory of Open Access Journals (Sweden)

    Kekelidze Vladimir

    2017-01-01

    Full Text Available The NICA (Nuclotron-based Ion Collider fAcility project is now under active realization at the Joint Institute for Nuclear Research (JINR, Dubna. The main goal of the project is a study of hot and dense strongly interacting matter in heavy-ion (up to Au collisions at the center-of-mass energies up to 11 GeV per nucleon. Two modes of operation are foreseen, collider mode and extracted beams, with two detectors: MPD and BM@N. The both experiments are in preparation stage. An average luminosity in the collider mode is expected to be 1027 cm−2 s−1 for Au (79+. Extracted beams of various nuclei with maximum momenta of 13 GeV/c (for protons will be available. A study of spin physics with extracted and colliding beams of polarized deuterons and protons at energies up to 27 GeV (for protons is foreseen with the NICA facility. The proposed program allows one to search for possible signs of phase transitions and critical phenomena as well as to shed light on the problem of the nucleon spin structure.

  17. Development of a database system for near-future climate change projections under the Japanese National Project SI-CAT

    Science.gov (United States)

    Nakagawa, Y.; Kawahara, S.; Araki, F.; Matsuoka, D.; Ishikawa, Y.; Fujita, M.; Sugimoto, S.; Okada, Y.; Kawazoe, S.; Watanabe, S.; Ishii, M.; Mizuta, R.; Murata, A.; Kawase, H.

    2017-12-01

    Analyses of large ensemble data are quite useful in order to produce probabilistic effect projection of climate change. Ensemble data of "+2K future climate simulations" are currently produced by Japanese national project "Social Implementation Program on Climate Change Adaptation Technology (SI-CAT)" as a part of a database for Policy Decision making for Future climate change (d4PDF; Mizuta et al. 2016) produced by Program for Risk Information on Climate Change. Those data consist of global warming simulations and regional downscaling simulations. Considering that those data volumes are too large (a few petabyte) to download to a local computer of users, a user-friendly system is required to search and download data which satisfy requests of the users. We develop "a database system for near-future climate change projections" for providing functions to find necessary data for the users under SI-CAT. The database system for near-future climate change projections mainly consists of a relational database, a data download function and user interface. The relational database using PostgreSQL is a key function among them. Temporally and spatially compressed data are registered on the relational database. As a first step, we develop the relational database for precipitation, temperature and track data of typhoon according to requests by SI-CAT members. The data download function using Open-source Project for a Network Data Access Protocol (OPeNDAP) provides a function to download temporally and spatially extracted data based on search results obtained by the relational database. We also develop the web-based user interface for using the relational database and the data download function. A prototype of the database system for near-future climate change projections are currently in operational test on our local server. The database system for near-future climate change projections will be released on Data Integration and Analysis System Program (DIAS) in fiscal year 2017

  18. Salt Repository Project: FY 85 technical project plan

    International Nuclear Information System (INIS)

    1985-07-01

    The FY 85 technical plan for the Salt Repository Project is briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management Program are discussed, and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 work breakdown structure tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Exploratory Shaft, Test Facilities, Land Acquisition, and Project Management) in the various sections. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. A strategy diagram and a master schedule are included and each of the milestones is also listed chronologically in the sections

  19. 2013 BNL Site Environmental Report. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Ratel, K.; Remien, J.; Pohlot, P.; Williams, J.; Green, T.; Paquette, P.; Dorsch, W.; Welty, T.; Burke, J.

    2014-10-01

    A summary of Brookhaven National Laboratory’s (BNL) Site Environmental Report, meant to inform the public, regulators, employees, and other stakeholders of the Laboratory’s environmental performance in the lab’s surrounding area during the calendar year. The review is comprised of multiple volumes relevant to environmental data/environmental management performance and groundwater status report.

  20. Tailoring Small IT Projects in the Project Planning Phase

    Science.gov (United States)

    Mulhearn, Michael F.

    2011-01-01

    Project management (PM) and systems engineering (SE) are essential skills in information technology (IT). There is an abundance of information available detailing the comprehensive bodies of knowledge, standards, and best practices. Despite the volume of information, there is surprisingly little information about how to tailor PM and SE tasks for…

  1. The Carolina Bay Restoration Project - Status Report II 2000-2004.

    Energy Technology Data Exchange (ETDEWEB)

    Barton, Christopher

    2006-07-13

    A Wetlands Mitigation Bank was established at SRS in 1997 as a compensatory alternative for unavoidable wetland losses. Prior to restoration activities, 16 sites included in the project were surveyed for the SRS Site Use system to serve as a protective covenant. Pre-restoration monitoring ended in Fall 2000, and post restoration monitoring began in the Winter/Spring of 2001. The total interior harvest in the 16 bays after harvesting the trees was 19.6 ha. The margins in the opencanopy, pine savanna margin treatments were thinned. Margins containing areas with immature forested stands (bay 5184 and portions of bay 5011) were thinned using a mechanical shredder in November 2001. Over 126 hectares were included in the study areas (interior + margin). Planting of two tree species and the transplanting of wetland grass species was successful. From field surveys, it was estimated that approximately 2700 Nyssa sylvatica and 1900 Taxodium distichum seedlings were planted in the eight forested bays resulting in an average planting density of ≈ 490 stems ha-1. One hundred seedlings of each species per bay (where available) were marked to evaluate survivability and growth. Wetland grass species were transplanted from donor sites on SRS to plots that ranged in size from 100 – 300 m2, depending on wetland size. On 0.75 and 0.6 meter centers, respectively, 2198 plugs of Panicum hemitomon and 3021 plugs Leersia hexandra were transplanted. New shoots originating from the stumps were treated with a foliar herbicide (Garlon® 4) during the summer of 2001 using backpack sprayers. Preliminary information from 2000-2004 regarding the hydrologic, vegetation and faunal response to restoration is presented in this status report. Post restoration monitoring will continue through 2005. A final report to the Mitigation Bank Review Team will be submitted in mid-2006.

  2. Update on the status of the West Valley demonstration project

    International Nuclear Information System (INIS)

    Greeves, J.T.; Camper, L.W.; Orlando, D.A.; Glenn, C.J.; Buckley, J.T.; Giardina, P.A.

    2002-01-01

    From 1966 to 1972, under an Atomic Energy Commission (AEC) license, Nuclear Fuel Services (NFS) reprocessed 640 metric tons of spent fuel at its West Valley, New York, facility-, the only commercial spent fuel reprocessing plant in the U.S. The facility shut down in 1972, for modifications to increase its seismic stability and to expand its capacity. In 1976, without restarting the operation, NFS withdrew from the reprocessing business and returned control of the facilities to the site owner, the New York State Energy Research and Development Authority (NYSERDA). The reprocessing activities resulted in about 2.3 million liters (600,000 gallons) of liquid high-level waste (HLW) stored below ground in tanks, other radioactive wastes, and residual radioactive contamination. The West Valley site was licensed by AEC, and then the U.S. Nuclear Regulatory Commission (NRC), until 1981, when the license was suspended to execute the 1980 West Valley Demonstration Project (WVDP) Act. The WVDP Act outlines the responsibilities of the U.S. Department of Energy (DOE), NRC, and NYSERDA at the site, including the NRC's responsibility to develop decommissioning criteria for the site. The Commission published the final policy statement on decommissioning criteria for the WVDP at the West Valley site after considering comments from interested stakeholders. In that regard, the Commission prescribed the License Termination Rule (LTR) criteria for the WVDP at the West Valley site, reflecting the fact that the applicable decommissioning goal for the entire NRC-licensed site is compliance with the requirements of the LTR. This paper will describe the history of the site, provide an update of the status of the decommissioning of the site and an overview of the technical and policy issues facing Federal and State regulators and other stakeholders as they strive to complete the remediation of the site. (author)

  3. Vitamin D Pooling Project

    Science.gov (United States)

    The Vitamin D Pooling Project of Rarer Cancers brought together investigators from 10 cohorts to conduct a large prospective epidemiologic study of the association between vitamin D status and seven rarer cancers.

  4. Project Lifescape - The Macaques of India

    Indian Academy of Sciences (India)

    Home; Journals; Resonance – Journal of Science Education; Volume 6; Issue 9. Project Lifescape - The Macaques of India. Anindya Sinha. Classroom Volume 6 Issue 9 September 2001 pp 94-105. Fulltext. Click here to view fulltext PDF. Permanent link: https://www.ias.ac.in/article/fulltext/reso/006/09/0094-0105 ...

  5. Application of MARSSIM for Final Status Survey of the Decommissioning Project

    International Nuclear Information System (INIS)

    Hong, Sang Bum; Lee, Ki Won; Park, Jin Ho; Chung, Un Soo

    2011-01-01

    The release of a site and building from regulatory control is the final stage of the decommissioning process. The MARSSIM (Multi-Agency Radiation Survey and Site Investigation Manual) provides overall framework for conducting data collection for a final status survey to demonstrate compliance with site closure requirements. The KAERI carried out establishing a final status survey by using the guidance provided in the MARSSIM for of a site and building of the Korea Research Reactor. The release criteria for a site and building were set up based on these results of the site specific release levels which were calculated by using RESRAD and RESRAD-Build codes. The survey design for a site and building was classified by using the survey dataset and potential contamination. The number of samples in each survey unit was calculated by through a statistical test using the collected data from a scoping and characterization survey. The results of the final status survey were satisfied the release criteria based on an evaluation of the measured data.

  6. Status of the SPARC Project

    CERN Document Server

    Serafini, Luca; Alessandria, Franco; Bacci, Alberto; Bellaveglia, Marco; Bertolucci, Sergio; Biagini, Maria; Boni, Roberto; Boscolo, Ilario; Boscolo, Manuela; Broggi, Francesco; Castellano, Michele; Catani, Luciano; Chiadroni, Enrica; Cialdi, Simone; Cianchi, Alessandro; Ciocci, Franco; Clozza, Alberto; Dattoli, Giuseppe; De Martinis, Carlo; Di Pirro, Giampiero; Dipace, Antonio; Doria, Andrea; Dowell, David; Drago, Alessandro; Emma, Paul; Esposito, Adolfo; Ferrario, Massimo; Ficcadenti, L; Filippetto, Daniele; Flora, F; Fusco, Valeria; Gabrielli, E; Gallerano, Gian P; Gallo, Alessandro; Gatti, Giancarlo; Ghigo, Andrea; Giannessi, Luca; Giove, Dario; Giovenale, Emilio; Guiducci, Susanna; Incurvati, Maurizio; Levi, Decio; Ligi, Carlo; Limborg-Deprey, Cecile; Marcellini, Fabio; Maroli, Cesare; Mattioli, Mario; Mauri, Marco; Medici, G; Messina, Giovanni; Migliorati, Mauro; Mostacci, Andrea; Musumeci, Pietro; Nisoli, Mauro; Ottaviani, P L; Pagnutti, Simonetta; Palumbo, Luigi; Parisi, Giovanni; Pellegrino, Luigi; Pelliccia, Daniele; Petrarca, Massimo; Petrillo, Vittoria; Picardi, Luigi; Preger, Miro; Quattromini, Marcello; Renieri, Alberto; Ricci, Ruggero; Rome, Massimiliano; Ronci, G; Ronsivalle, Concetta; Rosenzweig, James E; Rosetti, Maurizio; Sabia, Elio; Sanelli, Claudio; Sassi, Mauro; Serio, Mario; Sgamma, Francesco; Spataro, Bruno; Stagira, Salvatore; Stecchi, Alessandro; Stella, Angelo; Tazzari, Sergio; Tazzioli, Franco; Thomas Palmer, Dennis; Torre, A; Vaccarezza, Cristina; Vescovi, Mario; Vicario, Carlo; Zucchini, Alberto; de Silvestri, Sandro

    2005-01-01

    The SPARC project has entered its installation phase at INFN-LNF: its main goal is the promotion of an R&D activity oriented to the development of a high brightness photoinjector to drive SASE-FEL experiments. The design of the 150 MeV photoinjector has been completed and the construction of its main components is in progress, as well as the design of the 12 m undulator. In this paper we will report on the installation and test of some major components, like the Ti:Sa laser system to drive the photo-cathode, the RF gun, the RF power system, as well as some test results on the RF deflector and 4th harmonic X-band cavity prototypes. Advancements in the control and beam diagnostics systems will also be reported, in particular on the emittance-meter device for beam emittance measurements in the drift space downstream the RF gun. Recent results on laser pulse shaping, obtained with two alternative techniques (DAZZLER and Liquid Crystal Mask), show the feasibility of producing 10 ps flat-top laser pulses in the...

  7. S-1 project. Volume II. Hardware. 1979 annual report

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    This volume includes highlights of the design of the Mark IIA uniprocessor (SMI-2), and the SCALD II user's manual. SCALD (structured computer-aided logic design system) cuts the cost and time required to design logic by letting the logic designer express ideas as naturally as possible, and by eliminating as many errors as possible - through consistency checking, simulation, and timing verification - before the hardware is built. (GHT)

  8. Accelerator Technology Program: Status report, October 1985--March 1986: Volume 1

    International Nuclear Information System (INIS)

    Jameson, R.A.; Schriber, S.O.

    1988-07-01

    This report presents highlights of the major projects in the Accelerator Technology (AT) Division of the Los Alamos National Laboratory. The first section details progress associated with the accelerator test stand. Following sections cover achievements in accelerator theory and simulation, LAMPF II accomplishments, and updates on BEAR, beam dynamics, the rf laboratory, p-bar gravity experiment, University of Illinois racetrack microtron, and NBS microtron. Also included are results from the Proton Storage Ring commissioning, developments in very high microwave systems, and advances in the Fusion Materials Irradiation Test rf technology. In addition, the Phoenix Project and the Krypton Fluoride Project are discussed. The report concludes with a listing of papers published by AT-Division personnel during this reporting period. 42 figs., 5 tabs

  9. HPV status, cancer stem cell marker expression, hypoxia gene signatures and tumour volume identify good prognosis subgroups in patients with HNSCC after primary radiochemotherapy: A multicentre retrospective study of the German Cancer Consortium Radiation Oncology Group (DKTK-ROG)

    DEFF Research Database (Denmark)

    Linge, Annett; Lohaus, Fabian; Löck, Steffen

    2016-01-01

    OBJECTIVE: To investigate the impact of the tumour volume, HPV status, cancer stem cell (CSC) marker expression and hypoxia gene signatures, as potential markers of radiobiological mechanisms of radioresistance, in a contemporary cohort of patients with locally advanced head and neck squamous cell...

  10. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  11. 49 CFR 268.17 - Project selection criteria.

    Science.gov (United States)

    2010-10-01

    ... criteria will govern FRA's selection of projects to receive funding under the Maglev Deployment Program. (a... are to be expected in the United States. (4) The degree to which the project will augment a Maglev... development status of the Maglev technology selected by the applicant for the project. (c) Benefits for the...

  12. How Is the Practice of Yoga Related to Weight Status? Population-Based Findings From Project EAT-IV.

    Science.gov (United States)

    Neumark-Sztainer, Dianne; MacLehose, Richard F; Watts, Allison W; Eisenberg, Marla E; Laska, Melissa N; Larson, Nicole

    2017-12-01

    Yoga may provide a strategy for healthy weight management in young adults. This study examined prevalence and characteristics of young adults' yoga practice and associations with changes in body mass index. Surveys were completed by 1830 young adults (31.1 ± 1.6 y) participating in Project EAT-IV. Cross-sectional and 5-year longitudinal analyses were conducted stratified by initial weight status. Two-thirds (66.5%) of nonoverweight women and 48.9% of overweight women reported ever doing yoga, while 27.2% of nonoverweight women and 16.4% of overweight women practiced regularly (≥30 min/wk). Fewer men practiced yoga. Among young adults practicing regularly (n = 294), differences were identified in intensity, type, and location of yoga practice across weight status. Young adults who were overweight and practiced yoga regularly showed a nonsignificant 5-year decrease in their body mass index (-0.60 kg/m 2 ; P = .49), whereas those not practicing regularly had significant increases in their body mass index (+1.37 kg/m 2 ; P yoga was inversely associated with weight gain among both overweight and nonoverweight young adults practicing yoga regularly. Young adults of different body sizes practice yoga. Yoga was associated with less weight gain over time, particularly in overweight young adults. Practicing yoga on a regular basis may help with weight gain prevention.

  13. Design concepts and status of the Korean next generation reactor (KNGR)

    International Nuclear Information System (INIS)

    Cho, Sung Jae; Kim, Han Gon

    1999-01-01

    The national project to develop KNGR, a 4000 MWth evolutionary advanced light water reactor (ALWR), has been organized in three phases according to the development status in 1992. During the first phase, the top-tier design requirements and the design concepts to meet the requirements had been established. The project is currently in the second phase of which the major objective is to complete the basic design sufficient to confirm the plant safety. This paper describes the overall design concepts and status of the KNGR briefly which developed and/or being developed through the project. (author)

  14. Improving the Status of Human and Material Resources in Public ...

    African Journals Online (AJOL)

    Improving the Status of Human and Material Resources in Public Primary School in Oyo States ... the Millennium Development Goals project in the State. ... libraries, well-equipped first aid centres, adequate electronically projected instructional ...

  15. Method and apparatus for imaging volume data

    International Nuclear Information System (INIS)

    Drebin, R.; Carpenter, L.C.

    1987-01-01

    An imaging system projects a two dimensional representation of three dimensional volumes where surface boundaries and objects internal to the volumes are readily shown, and hidden surfaces and the surface boundaries themselves are accurately rendered by determining volume elements or voxels. An image volume representing a volume object or data structure is written into memory. A color and opacity is assigned to each voxel within the volume and stored as a red (R), green (G), blue (B), and opacity (A) component, three dimensional data volume. The RGBA assignment for each voxel is determined based on the percentage component composition of the materials represented in the volume, and thus, the percentage of color and transparency associated with those materials. The voxels in the RGBA volume are used as mathematical filters such that each successive voxel filter is overlayed over a prior background voxel filter. Through a linear interpolation, a new background filter is determined and generated. The interpolation is successively performed for all voxels up to the front most voxel for the plane of view. The method is repeated until all display voxels are determined for the plane of view. (author)

  16. LLCEDATA and LLCECALC for Windows version 1.0, Volume 1: User`s manual

    Energy Technology Data Exchange (ETDEWEB)

    McFadden, J.G.

    1998-09-04

    LLCEDATA and LLCECALC for Windows are user-friendly computer software programs that work together to determine the proper waste designation, handling, and disposition requirements for Long Length Contaminated Equipment (LLCE). LLCEDATA reads from a variety of data bases to produce an equipment data file (EDF) that represents a snapshot of both the LLCE and the tank it originates from. LLCECALC reads the EDF and a gamma assay (AV2) file that is produced by the Flexible Receiver Gamma Energy Analysis System. LLCECALC performs corrections to the AV2 file as it is being read and characterizes the LLCE. Both programs produce a variety of reports, including a characterization report and a status report. The status report documents each action taken by the user, LLCEDATA, and LLCECALC. Documentation for LLCEDATA and LLCECALC for Windows is available in three volumes. Volume 1 is a user`s manual, which is intended as a quick reference for both LLCEDATA and LLCECALC. Volume 2 is a technical manual, and Volume 3 is a software verification and validation document.

  17. Genetic analyses for deciphering the status and role of ...

    Indian Academy of Sciences (India)

    Home; Journals; Journal of Genetics; Volume 96; Issue 1. Genetic analyses for deciphering the status and role of photoperiodic and maturity genes in major Indian soybean cultivars. SANJAY GUPTA VIRENDER SINGH BHATIA GIRIRAJ KUMAWAT DEVSHREE THAKUR GOURAV SINGH RACHANA TRIPATHI GYANESH ...

  18. Inventory of Federal energy-related environment and safety research for FY 1977. Volume IV. Indices

    Energy Technology Data Exchange (ETDEWEB)

    1978-07-01

    This volume contains indexes useful for accessing projects contained in the FY 1977 Federal Inventory. The indexing has been greatly broadened this year to provide hard copy users with greater flexibility in locating projects. The Inventory projects are printed sequentially by log number. An inventory log number is a unique number assigned to each project from a block of numbers set aside for each agency. The association of agencies with blocks of log numbers is found in the table of contents of the Index (Volume III).

  19. 14 CFR 152.325 - Financial status report: Airport planning.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Financial status report: Airport planning... agency conducting a project for airport system planning shall submit a financial status report on a form... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Accounting and Reporting Requirements § 152.325 Financial...

  20. Yucca Mountain transportation routes: Preliminary characterization and risk analysis; Volume 2, Figures [and] Volume 3, Technical Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Souleyrette, R.R. II; Sathisan, S.K.; di Bartolo, R. [Nevada Univ., Las Vegas, NV (United States). Transportation Research Center

    1991-05-31

    This report presents appendices related to the preliminary assessment and risk analysis for high-level radioactive waste transportation routes to the proposed Yucca Mountain Project repository. Information includes data on population density, traffic volume, ecologically sensitive areas, and accident history.

  1. Military Family Coping Project - Phase II

    Science.gov (United States)

    2015-05-01

    Anxiety, Life Satisfaction , Addiction, Trauma 4 The Military Family Coping Project reflects two phases. The first consisted of a series of focus...need for and guided the work of the Military Family Coping Project Phase II funded by TATRC. The Military Family Coping Project Phase II was...solidarity. For the purposes of family functioning analyses, married and unmarried soldiers were analyzed separately because marital status affects

  2. Zooplankton biomass (displacement volume, dry mass, ash-free dry mass) data collected in Eastern Central Atlantic during CIPREA project from 1978-07-25 to 1978-09-12 by France (NODC Accession 0070783)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Zooplankton biomass (displacement volume, dry mass, and ashfree dry mass) data collected in Eastern Central Atlantic during CIPREA project in Jul - Sep 1978 by...

  3. Proceedings of the seventh annual gasification and gas stream cleanup systems contractors review meeting: Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Ghate, M.R.; Markel, K.E. Jr.; Jarr, L.A.; Bossart, S.J. (eds.)

    1987-08-01

    On June 16 through 19, 1987, METC sponsored the Seventh Annual Gasification and Gas Stream Cleanup Systems Contractors Review Meeting which was held at the Sheraton Lakeview Conference Center in Morgantown, West Virginia. The primary purpose of the meeting was threefold: to review the technical progress and current status of the gasification and gas stream cleanup projects sponsored by the Department of Energy; to foster technology exchange among participating researchers and other technical communities; to facilitate interactive dialogues which would identify research needs that would make coal-based gasification systems more attractive economically and environmentally. More than 310 representatives of Government, academia, industry, and foreign energy research organizations attended the 4-day meeting. Fifty-three papers and thirty poster displays were presented summarizing recent developments in the gasification and gas stream cleanup programs. Volume I covers information presented at sessions 1 through 4 on systems for the production of Co-products and industrial fuel gas, environmental projects, and components and materials. Individual papers have been processed for the Energy Data Base.

  4. Designing and conducting health system research projects, volume ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    These 'green modules'* found their way to Malaysia, where Indra ..... They determine nutritional and hygiene practices, alert children to dangers, provide care in ... money from taxes and donor agencies to finance the health care system. .... The principle of cost-effectiveness is important in the selection of research projects.

  5. Present status of research within the International Project

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    The short report enumerates the studies which are now completed by the International Project in the Field of Food Irradiation and the studies to be continued. New feeding studies with irradiated fish, rice, spices and mangoes are performed. (MG) [de

  6. Design status of the Delfi-Next nanosatellite project

    NARCIS (Netherlands)

    Bouwmeester, J.; Brouwer, G.F.; Gill, E.K.A.; Monna, G.L.E.; Rotteveel, J.

    2010-01-01

    Delfi-Next is the second project within the Delfi nanosatellite development program of Delft University of Technology. It will provide students hands-on experience, facilitate technology demonstration for innovative miniaturized space technology from the Dutch space sector and allow advancements in

  7. ANDRA - Referential Materials. Volume 1: Context and scope; Volume 2: Argillaceous materials; Volume 3: Cementitious materials; Volume 4: The corrosion of metallic materials

    International Nuclear Information System (INIS)

    2001-01-01

    This huge document gathers four volumes. The first volume presents some generalities about materials used in the storage of radioactive materials (definition, design principle, current choices and corresponding storage components, general properties of materials and functions of the corresponding storage components, physical and chemical solicitations experienced by materials in a storage), and the structure and content of the other documents. The second volume addresses argillaceous materials. It presents some generalities about these materials in the context of a deep geological storage, and about their design. It presents and comments the crystalline and chemical, and physical and chemical characteristics of swelling argillaceous materials and minerals, describes how these swelling argillaceous materials are shaped and set up, presents and comments physical properties (hydraulic, mechanical and thermal properties) of these materials, comments and discusses the modelling of the geo-chemical behaviour, and their behaviour in terms of containment and transport of radionuclides. The third volume addresses cementitious materials. It presents some generalities about these materials in the context of a deep geological storage, and about their definition and specifications. It presents some more detailed generalities (cement definition and composition, hydration, microstructure of hydrated cements, adjuvants), presents and comments their physical properties (fresh concrete structure and influence of composition, main aimed properties in the hardened status, transfer, mechanical, and thermal properties, shaping and setting up of these materials, technical solutions for hydraulic works). The fourth volume addresses the corrosion of metallic materials. It presents some generalities about these materials in the context of a deep geological storage of radioactive materials. It presents metallic materials and discusses their corrosion behaviour. It describes the peculiarities

  8. Fossil energy waste management. Technology status report

    Energy Technology Data Exchange (ETDEWEB)

    Bossart, S.J.; Newman, D.A.

    1995-02-01

    This report describes the current status and recent accomplishments of the Fossil Energy Waste Management (FE WM) projects sponsored by the Morgantown Energy Technology Center (METC) of the US Department of Energy (DOE). The primary goal of the Waste Management Program is to identify and develop optimal strategies to manage solid by-products from advanced coal technologies for the purpose of ensuring the competitiveness of advanced coal technologies as a future energy source. The projects in the Fossil Energy Waste Management Program are divided into three types of activities: Waste Characterization, Disposal Technologies, and Utilization Technologies. This technology status report includes a discussion on barriers to increased use of coal by-products. Also, the major technical and nontechnical challenges currently being addressed by the FE WM program are discussed. A bibliography of 96 citations and a list of project contacts is included if the reader is interested in obtaining additional information about the FE WM program.

  9. Controlled Ecological Life Support System Breadboard Project - 1988

    Science.gov (United States)

    Knott, W. M.

    1989-01-01

    The Controlled Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989-1993 are listed. The biomass production chamber to be used by the project is described.

  10. Buff book 1: status summary report, water reactor safety research

    International Nuclear Information System (INIS)

    1980-01-01

    This Management Report, to provide information for monitoring and controlling the progress of LWR Safety Research Projects Associated with the Office of Nuclear Regulatory Research and other agencies and organizations engaged in nuclear safety research. It utilizes data pertaining to project schedules, cost, and status which have been integrated into a network-based management information system, The purpose of this publication is to provide a vehicle for review of the current status and overall progress of the safety Research Program from a managerial point of view

  11. Anaemia, Nutritional Status and Parasitic Infection among Preschool ...

    African Journals Online (AJOL)

    Objective: This study was carried out to determine the packed cell volume nutritional status and parasitic infection among preschool children living in rural villages. Subjects and Methods: A total of 116 preschool children in nine villages formed the population for this study. The preschool children were studied using ...

  12. GPU-Based 3D Cone-Beam CT Image Reconstruction for Large Data Volume

    Directory of Open Access Journals (Sweden)

    Xing Zhao

    2009-01-01

    Full Text Available Currently, 3D cone-beam CT image reconstruction speed is still a severe limitation for clinical application. The computational power of modern graphics processing units (GPUs has been harnessed to provide impressive acceleration of 3D volume image reconstruction. For extra large data volume exceeding the physical graphic memory of GPU, a straightforward compromise is to divide data volume into blocks. Different from the conventional Octree partition method, a new partition scheme is proposed in this paper. This method divides both projection data and reconstructed image volume into subsets according to geometric symmetries in circular cone-beam projection layout, and a fast reconstruction for large data volume can be implemented by packing the subsets of projection data into the RGBA channels of GPU, performing the reconstruction chunk by chunk and combining the individual results in the end. The method is evaluated by reconstructing 3D images from computer-simulation data and real micro-CT data. Our results indicate that the GPU implementation can maintain original precision and speed up the reconstruction process by 110–120 times for circular cone-beam scan, as compared to traditional CPU implementation.

  13. About Nano-JASMINE Satellite System and Project Status

    Science.gov (United States)

    Sako, Nobutada

    Intelligent Space Systems Laboratory, The University of Tokyo (ISSL) and National Astronomical Observatory of Japan (NAO) have been developing a small infrared astrometry satellite named “Nano-JASMINE”. The satellite size is about 50cm cubic and 20kg, which plays a pre-cursor role of JASMINE Project which is programmed by NAO and JAXA. In addition, since there has been only one astrometry satellite HIPPARCOS by ESA in the past, Nano-JASMINE is also expected to achieve certain scientific results in the field of astrometry. In this project, ISSL aims to develop new advanced small satellite bus system whose performance is comparable to that of 100-500kg sized satellites, including attitude stability of 1 arc-second and thermal stability of the mission subsystem of 1 mK. This paper overviews the Nano-JASMINE bus system with emphasis on attitude and thermal control systems.

  14. IGCC demonstration project status combustion engineering IGCC repowering project

    International Nuclear Information System (INIS)

    Glamuzina, R.W.; Allen, R.J.; Peletz, L.J.

    1993-01-01

    This demonstration project was originally conceived as the repowering of an existing plant facility, the Lakeside Station in Springfield, Illinois. The Owner, City Water, Light and Power (CWL ampersand P), has removed five of the original boilers and three of the original turbines. The buildings have had asbestos insulation removed and the interiors have been prepared for the construction of a single Integrated Gasification Combined Cycle (IGCC) process train that will generate a net output of 60 megawatts. The plant consists of a combined cycle (gas turbine, heat recovery steam generator, steam turbine) power train located in the existing buildings and a coal gasification system in a new building. The gasification system contains ABB CE's air-blown, entrained flow, two stage gasifier, an advanced hot gas desulfurization system by General Electric Environmental Services, Inc. and the necessary auxiliary systems. The plant is designed to produce a nominal 60 MW net output with an ambient air temperature of 95 degrees F and a cooling water temperature of 89 degrees F on either Natural Gas or Illinois No. 5 coal

  15. Catalog of Investment Projects in Bulgaria

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-10-15

    This catalog includes information about 129 potential investment projects in Bulgaria and was developed by a team of experts from InvestBulgaria Agency in cooperation with municipalities and private companies. The document presents in brief general facts about the regions in Bulgaria. Projects are divided into the following categories: Tourism, Manufacturing, Urban Planning, Real Estate, Environment and renewable energy sources, Commerce, and Innovative and creative projects. The catalog provides detailed information about each project such as: status of the project, location, ownership, infrastructure, estimated value, contact information, etc.

  16. Addressing the technical capacity constraints on community-based labour intensive road projects - a case study of the Amadiba road project

    CSIR Research Space (South Africa)

    Lachman, A

    2006-09-01

    Full Text Available effect. 3. AIMS AND OBJECTIVE OF THE PAPER The main aim of this paper is to discuss the technical capacity constraints experienced on the Amadiba Road Project and to outline the measures taken to address them. Some of the objectives of this paper... are to: � Highlight the socioeconomic status of the community � Highlight the capacity needed on the project � Discuss some of the capacity building issues � Highlight the current state of the community 4. SOCIOECONOMIC STATUS OF THE AMADIBA...

  17. Integrated process status overview

    International Nuclear Information System (INIS)

    Gertman, D.I.; Gaudio, P. Jr.

    1986-01-01

    This report summarizes findings to date with the IPSO, a large plant status overview currently under development at the OECD Halden Reactor Project. As part of a joint Halden and Combustion Engineering project, the overview is being tested in part to determine whether the large screen overview concept being entertained for use in the nuclear power plant (NPP) industry will facilitate operator performance. To this end an interactive simulation technique was used to establish a proof-of-principle test for the IPSO. Process control, operations, and human factors experts at Halden participated in the test and evaluation

  18. Prognostic Factors for Hormone Sensitive Metastatic Prostate Cancer: Impact of Disease Volume

    Science.gov (United States)

    Alhanafy, Alshimaa Mahmoud; Zanaty, Fouad; Ibrahem, Reda; Omar, Suzan

    2018-04-27

    Background and Aim: The optimal management of metastatic hormone-sensitive prostate cancer has been controversial in recent years with introduction of upfront chemohormonal treatment based on results of several Western studies. This changing landscape has renewed interest in the concept “disease volume”, the focus of the present study is the Egyptian patients. Methods: Patients with hormone sensitive metastatic prostate cancer presenting at Menoufia University Hospital, Egypt, during the period from June 2013 to May 2016, were enrolled. All received hormonal treatment. Radiologic images were evaluated and patients were stratified according to their disease volume into high or low, other clinical and pathological data that could affect survival also being collected and analyzed. Results: A total of 128 patients were included, with a median age of 70 years (53.9% ≥70). About 46% had co-morbidities, 62% having high volume disease. During the median follow up period of 28 months about half of the patients progressed and one third received chemotherapy. On univariate analysis, disease volume, performance status (PS), prostate specific antigen level (PSA) and presence of pain at presentation were identified as factors influencing overall survival. Multivariate analysis revealed the independent predictor factors for survival to be PS, PSA and disease volume. The median overall survival with 27 months was high volume versus 49 with low volume disease (hazard ratio 2.1; 95% CI 1.2 - 4.4; P=0.02). Median progression free survival was 19 months in the high volume, as compared with 48 months in the low volume disease patients (hazard ratio, 2.44; 95% CI, 1.42 – 7.4; P=0.009). Conclusions: Disease volume is a reliable predictor of survival which should be incorporated with other important factors as; patient performance status and comorbidities in treatment decision-making. Creative Commons Attribution License

  19. Status of the IEEE P896 Future Backplane Bus

    International Nuclear Information System (INIS)

    Gustavson, D.B.

    1983-10-01

    The IEEE P896 Future Backplane Bus project has been influenced by and has influenced FASTBUS and several other contemporary bus designs. This paper summarizes the current status of that project, which is directed toward the needs of modern 32-bit microprocessor systems with multiple processors. Some of the technology developed for P896 will be important for future non-ECL implementations of FASTBUS and other buses. In particular, new bus drivers and receivers should greatly improve the performance and reliability of backplane buses and cable buses. The current status of the P896 serial bus is also summarized

  20. HESYRL control system status

    International Nuclear Information System (INIS)

    Yao Chihyuan

    1992-01-01

    HESYRL synchrotron radiation storage ring was completed in 1989 and has been in commissioning since then. Now it has met its design specification and is ready for synchrotron light experiments. Control system of the project was completed in 1989 and some modifications were made during commissioning. This paper describes its present configuration, status and upgrading plan. (author)

  1. ICPP calcined solids storage facility closure study. Volume III: Engineering design files

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    The following information was calculated to support cost estimates and radiation exposure calculations for closure activities at the Calcined Solids Storage Facility (CSSF). Within the estimate, volumes were calculated to determine the required amount of grout to be used during closure activities. The remaining calcine on the bin walls, supports, piping, and floor was also calculated to approximate the remaining residual calcine volumes at different stages of the removal process. The estimates for remaining calcine and vault void volume are higher than what would actually be experienced in the field, but are necessary for bounding purposes. The residual calcine in the bins may be higher than was is experienced in the field as it was assumed that the entire bin volume is full of calcine before removal activities commence. The vault void volumes are higher as the vault roof beam volumes were neglected. The estimations that follow should be considered rough order of magnitude, due to the time constraints as dictated by the project`s scope of work. Should more accurate numbers be required, a new analysis would be necessary.

  2. The VIRGO project

    International Nuclear Information System (INIS)

    Mours, B.

    1993-11-01

    The VIRGO detector is a 3 km length interferometer antenna with a design sensitivity aiming at the direct observation of gravitational waves. The expected gravitational wave sources are discussed, then the French-Italian experiment and the status of the project are described. (author) 4 refs., 4 figs

  3. Darmstadt Linear Accelerator (DALINAC) Research Laboratory. Status report - July 1988

    International Nuclear Information System (INIS)

    Anon.

    1988-07-01

    The status of the DALINAC project is reviewed. The accelerator and the experimental facilities are described, and a free-electron laser project is considered. Furthermore, experiments on inelastic electron scattering on nuclei and atomic systems are listed. (HSI)

  4. Solar technology assessment project. Volume 6: Photovoltaic technology assessment

    Science.gov (United States)

    Backus, C. E.

    1981-04-01

    Industrial production of photovoltaic systems and volume of sales are reviewed. Low cost silicon production techniques are reviewed, including the Czochralski process, heat exchange method, edge defined film fed growth, dentritic web growth, and silicon on ceramic process. Semicrystalline silicon, amorphous silicon, and low cost poly-silicon are discussed as well as advanced materials and concentrator systems. Balance of system components beyond those needed to manufacture the solar panels are included. Nontechnical factors are assessed. The 1986 system cost goals are briefly reviewed.

  5. Postmenopausal hormone therapy, type 2 diabetes mellitus, and brain volumes.

    Science.gov (United States)

    Espeland, Mark A; Brinton, Roberta Diaz; Manson, JoAnn E; Yaffe, Kristine; Hugenschmidt, Christina; Vaughan, Leslie; Craft, Suzanne; Edwards, Beatrice J; Casanova, Ramon; Masaki, Kamal; Resnick, Susan M

    2015-09-29

    To examine whether the effect of postmenopausal hormone therapy (HT) on brain volumes in women aged 65-79 years differs depending on type 2 diabetes status during postintervention follow-up of a randomized controlled clinical trial. The Women's Health Initiative randomized clinical trials assigned women to HT (0.625 mg/day conjugated equine estrogens with or without 2.5 mg/day medroxyprogesterone acetate) or placebo for an average of 5.6 years. A total of 1,402 trial participants underwent brain MRI 2.4 years after the trials; these were repeated in 699 women 4.7 years later. General linear models were used to assess the interaction between diabetes status and HT assignment on brain volumes. Women with diabetes at baseline or during follow-up who had been assigned to HT compared to placebo had mean decrement in total brain volume of -18.6 mL (95% confidence interval [CI] -29.6, -7.6). For women without diabetes, this mean decrement was -0.4 (95% CI -3.8, 3.0) (interaction p=0.002). This interaction was evident for total gray matter (pNeurology.

  6. ATLAS construction status

    International Nuclear Information System (INIS)

    Jenni, P.

    2006-01-01

    The ATLAS detector is being constructed at the LHC, in view of a data-taking startup in 2007. This report concentrates on the progress and the technical challenges of the detector construction, and summarizes the status of the work as of August 2004. The project is on track to allow the highly motivated ATLAS Collaboration to enter into a new exploratory domain of high-energy physics in 2007. (author)

  7. FASTBUS software status

    International Nuclear Information System (INIS)

    Gustavson, D.B.

    1980-10-01

    Computer software will be needed in addition to the mechanical, electrical, protocol and timing specifications of the FASTBUS, in order to facilitate the use of this flexible new multiprocessor and multisegment data acquisition and processing system. Software considerations have been important in the FASTBUS design, but standard subroutines and recommended algorithms will be needed as the FASTBUS comes into use. This paper summarizes current FASTBUS software projects, goals and status

  8. Projection models for health-effects assessment in populations exposed to radioactive and nonradioactive pollutants. Volume III. SPAHR interactive package guide

    International Nuclear Information System (INIS)

    Collins, J.J.

    1982-09-01

    The Simulation Package for the Analysis of Health Risk (SPAHR) is a computer software package based upon a demographic model for health risk projectons. The model extends several health risk projection models by making realistic assumptions about the population at risk, adn thus represents a distinct improvement over previous models. Complete documentation for use of SPAHR is contained in this five-volume publication. The demographic model in SPAHR estimates population response to environmental toxic exposures. Latency of response, changing dose level over time, competing risks from other causes of death, and population structure can be incorporated into SPAHR to project health risks. Risks are measured by morbid years, number of deaths, and loss of life expectancy. Comparisons of estimates of excess deaths demonstrate that previous health risk projection models may have underestimated excess deaths by a factor of from 2 to 10, depending on the pollutant and the exposure scenario. The software supporting the use of the demographic model is designed to be user oriented. Complex risk projections are made by responding to a series of prompts generated by the package. The flexibility and ease of use of SPAHR make it an important contribution to existing models and software packages. This manual outlines the use of the interactive capabilities of SPAHR. SPAHR is an integrated system of computer programs designed for simulating numerous health risk scenarios using the techniques of demographic modeling. This system of computer programs has been designed to be very flexible so as to allow the user to simulate a large variety of scenarios. It provides the user with an integrated package for projecting the impacts on human health of exposure to various hazards, particularly those resulting from the effluents related to energy production

  9. Present status of the KISS project

    Science.gov (United States)

    Miyatake, H.; Wada, M.; Watanabe, X. Y.; Hirayama, Y.; Schury, P.; Ahmed, M.; Ishiyama, H.; Jeong, S. C.; Kakiguchi, Y.; Kimura, S.; Moon, J. Y.; Mukai, M.; Oyaizu, M.; Park, J. H.

    2018-04-01

    KISS project aims at finding an astrophysical condition for synthesizing r-process heavy element isotopes, which are characterized as the third peak in the solar abundance pattern. This is an experimental challenge in nuclear physics to measure ground and isomeric state properties of unknown nuclei around the region of N=126 isotones. So far we have constructed and developed new type of mass separation system, KISS (KEK Isotope Separation System) and performed measurements of lifetimes and hyperfine structures of some platinum and iridium neutron-rich radioactive isotopes by applying multi-nucleon transfer reactions and in-gas laser ionization and spectroscopy (IGLIS) methods. In this report, recent physics results, updated KISS performance, and future's research plan including a challenge of a systematic mass measurement with MRTOF (Multi-Reflection Time-Of-Flight mass spectrograph) are presented.

  10. Second annual clean coal technology conference: Proceedings. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-09

    The Second Annual Clean Coal Technology Conference was held at Atlanta, Georgia, September 7--9, 1993. The Conference, cosponsored by the US Department of Energy (USDOE) and the Southern States Energy Board (SSEB), seeks to examine the status and role of the Clean Coal Technology Demonstration Program (CCTDP) and its projects. The Program is reviewed within the larger context of environmental needs, sustained economic growth, world markets, user performance requirements and supplier commercialization activities. This will be accomplished through in-depth review and discussion of factors affecting domestic and international markets for clean coal technology, the environmental considerations in commercial deployment, the current status of projects, and the timing and effectiveness of transfer of data from these projects to potential users, suppliers, financing entities, regulators, the interested environmental community and the public. Individual papers have been entered separately.

  11. Severn Barrage project. Detailed report - V. 5

    Energy Technology Data Exchange (ETDEWEB)

    1989-01-01

    Prior to the present programme of work, the effects which a tidal power barrage would have on the region, during both construction and operation, had not been studied in detail. This volume of the Detailed Report therefore represents a significant extension of work into these aspects of the Severn Barrage Project. In the Regional Study, a number of benefits have been identified, some of which may represent net benefits nationally. The economic assessment of both regional and national benefits and costs is presented. The second part of this volume reports on the work done on the Legal Background for the Project. (author).

  12. Present status and physics prospects of SSC

    International Nuclear Information System (INIS)

    Sugimoto, Shojiro

    1990-01-01

    Physics prospects of Superconducting Super Collider (SSC) are discussed, referring to other coming colliders. In addition, the present status of the SSC project and detector proposals for the experiments are described. (author)

  13. Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transport project: Current and advanced act control system definition study. Volume 2: Appendices

    Science.gov (United States)

    Hanks, G. W.; Shomber, H. A.; Dethman, H. A.; Gratzer, L. B.; Maeshiro, A.; Gangsaas, D.; Blight, J. D.; Buchan, S. M.; Crumb, C. B.; Dorwart, R. J.

    1981-01-01

    The current status of the Active Controls Technology (ACT) for the advanced subsonic transport project is investigated through analysis of the systems technical data. Control systems technologies under examination include computerized reliability analysis, pitch axis fly by wire actuator, flaperon actuation system design trade study, control law synthesis and analysis, flutter mode control and gust load alleviation analysis, and implementation of alternative ACT systems. Extensive analysis of the computer techniques involved in each system is included.

  14. Federated product data management in multi company projects

    NARCIS (Netherlands)

    Pels, H.J.; Elmaraghy, H.A.; Elmaraghy, W.H.

    2005-01-01

    An approach for enabling concurrent engineering between companies by providing a proper collaboration platform, as developed in the VIDOP project is proposed. Apart from security, information status is an important element of trust. However, status-coding schemes differ much between companies and

  15. Zagreb Conference on English Contrastive Projects, 7-9 December 1970. Papers and Discussion. Studies 4. The Yugoslav Serbo-Croatian-English Contrastive Project.

    Science.gov (United States)

    Filipovic, Rudolf, Ed.

    The fourth volume in this series contains the papers presented at the Zagreb Conference on English Contrastive Projects. They are: "Recent Center Activities in Contrastive Linguistics," by William Nemser; "The Yugoslav Serbo-Croatian-English Contrastive Project So Far," by Rudolf Filipovic; "The Poznan Polish-English Contrastive Project," by Jacek…

  16. Hydration Status Is Associated with Aortic Stiffness, but Not with Peripheral Arterial Stiffness, in Chronically Hemodialysed Patients

    Directory of Open Access Journals (Sweden)

    Daniel Bia

    2015-01-01

    Full Text Available Background. Adequate fluid management could be essential to minimize high arterial stiffness observed in chronically hemodialyzed patients (CHP. Aim. To determine the association between body fluid status and central and peripheral arterial stiffness levels. Methods. Arterial stiffness was assessed in 65 CHP by measuring the pulse wave velocity (PWV in a central arterial pathway (carotid-femoral and in a peripheral pathway (carotid-brachial. A blood pressure-independent regional arterial stiffness index was calculated using PWV. Volume status was assessed by whole-body multiple-frequency bioimpedance. Patients were first observed as an entire group and then divided into three different fluid status-related groups: normal, overhydration, and dehydration groups. Results. Only carotid-femoral stiffness was positively associated (P<0.05 with the hydration status evaluated through extracellular/intracellular fluid, extracellular/Total Body Fluid, and absolute and relative overhydration. Conclusion. Volume status and overload are associated with central, but not peripheral, arterial stiffness levels with independence of the blood pressure level, in CHP.

  17. Concentrating Solar Power Projects - Khi Solar One | Concentrating Solar

    Science.gov (United States)

    Power | NREL Khi Solar One This page provides information on Khi Solar One, a concentrating solar power (CSP) project, with data organized by background, parcipants and power plant configuration . Status Date: February 8, 2016 Project Overview Project Name: Khi Solar One Country: South Africa Location

  18. Alternatives for managing wastes from reactors and post-fission operations in the LWR fuel cycle. Volume 1. Summary: alternatives for the back of the LWR fuel cycle types and properties of LWR fuel cycle wastes projections of waste quantities; selected glossary

    International Nuclear Information System (INIS)

    1976-05-01

    Volume I of the five-volume report contains executive and technical summaries of the entire report, background information of the LWR fuel cycle alternatives, descriptions of waste types, and projections of waste quantities. Overview characterizations of alternative LWR fuel cycle modes are also included

  19. Advanced Mirror Technology Development (AMTD) Project: 3.0 Year Status

    Science.gov (United States)

    Stahl, H. Philip

    2015-01-01

    Advanced Mirror Technology Development (AMTD) is a funded NASA Strategic Astrophysics Technology project. Begun in 2011, we are in Phase 2 of a multi-year effort. Our objective is to mature towards TRL6 critical technologies needed to produce 4-m or larger flight-qualified UVOIR mirrors by 2018 so that a viable astronomy mission can be considered by the 2020 Decadal Review. The developed technology must enable missions capable of both general astrophysics and ultra-high contrast observations of exoplanets. Just as JWST's architecture was driven by launch vehicle, a future UVOIR mission's architecture (monolithic, segmented or interferometric) will depend on capacities of future launch vehicles (and budget). Since we cannot predict the future, we must prepare for all potential futures. Therefore, we are pursuing multiple technology paths. AMTD uses a science-driven systems engineering approach. We mature technologies required to enable the highest priority science AND result in a high-performance low-cost low-risk system. One of our key accomplishments is that we have derived engineering specifications for advanced normal-incidence monolithic and segmented mirror systems needed to enable both general astrophysics and ultra-high contrast observations of exoplanets missions as a function of potential launch vehicle and its inherent mass and volume constraints. Another key accomplishment is that we have matured our technology by building and testing hardware. To demonstrate stacked core technology, we built a 400 mm thick mirror. Currently, to demonstrate lateral scalability, we are manufacturing a 1.5 meter mirror. To assist in architecture trade studies, the Engineering team develops Structural, Thermal and Optical Performance (STOP) models of candidate mirror assembly systems including substrates, structures, and mechanisms. These models are validated by test of full- and subscale components in relevant thermo-vacuum environments. Specific analyses include: maximum

  20. Final ITER CTA project board meeting

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2003-01-01

    The final ITER CTA Project Board Meeting (PB) took place in Barcelona, Spain on 8 December 2002. The PB took notes of the comments concerning the status of the International Team and the Participants Teams, including Dr. Aymar's report 'From ITER to a FUSION Power Reactor' and the assessment of the ITER project cost estimate