WorldWideScience

Sample records for project staff designed

  1. Effective utilization of maintenance staff in design and implementation of major project work

    International Nuclear Information System (INIS)

    Wyman, D.; Dingle, J.; Brown, R.

    1995-01-01

    The reorganization of Pickering Nuclear Division some 2 years ago resulted in the formation of the Projects and Modifications department. This department takes an integrated approach to manage all aspects of large projects at Pickering. The integration of Design, Drafting, Procurement, Construction and Operations functions into project teams represents a fundamental change to project management at Pickering. The development of integrated teams has great potential for reducing both the time and cost associated with project implementation, while at the same time improving the quality, and maintainability of the commissioned in service project. The Pickering Rehab organization 1989-1993, established to perform the rehab / retube of Units 3 and 4 had proven that a team environment will produce effective results. The outcome was astounding, critical categories such as Safety, Quality of Work, and Timeliness, had proven the team's effectiveness. The integration of operations maintenance staff into the project work activities is still evolving, and has probably required the most adaptation to change for both the former Construction and Operations organizations. Maximizing the utilization of the maintenance staff in the design and implementation of major project work will prove to be a key to a long term operating success of these projects. This paper will focus in on the effective usage of Maintenance staff in the design and implementation phases of major project work at Pickering, and on the benefits realized using this approach. It will be divided into 5 sections as indicated. 1. Past Project Shortfalls. 2. Benefits of the inclusion of Maintenance staff in the Calandria Vault Rehab Project. 3. Maintenance involvement in the Pickering 'A' Shutdown System Enhancement (SDSE) Project. 4. Challenges resulting from the inclusion of Maintenance staff project teams. 5. Summary. (author)

  2. Project on School Staff Health Promotion in Poland: The First Experiences

    Science.gov (United States)

    Woynarowska-Soldan, Magdalena

    2015-01-01

    Purpose: The purpose of this paper is to present the concept, methods of implementation, results and experiences from the first stage of the three-year project on school staff health promotion carried out within the framework of the health-promoting school (HPS) network in Poland. Design/methodology/approach: The project was implemented in 2012 in…

  3. Staff training program of CANDU projects in Saskatoon

    International Nuclear Information System (INIS)

    Huterer, J.

    1996-01-01

    This paper describes the training process for a nuclear project on a new site. When AECL opened a project office Saskatoon, senior management recognized the need for large scale staff training and made the necessary commitments. Two types of training programs were initiated, general and technical. The general training plan included topics related to nuclear project life cycle. Technical training was discipline and task specific. Based on the job descriptions and staff qualifications, technical training requirements were documented for the entire staff. The training strategy was developed and implemented. Detailed records were maintained to monitor the progress, draw conclusions, and plan training for future nuclear facilities. (author)

  4. Forty project management strategies for the medical practice staff.

    Science.gov (United States)

    Hills, Laura Sachs

    2010-01-01

    Most every medical practice will embark at one time or another on a large and complex new project. The practice may, for instance, undertake a project in office construction or renovation, practice expansion, new technology, or a new large-scale event. The medical practice staff may find itself creating the project plan, overseeing its execution, and working through the plan day to day until its completion. In short, the staff may find itself responsible for project management. This article contains 40 specific, easy-to-implement project management strategies medical practice employees can use to manage both the large and small projects they undertake on behalf of the practice. It suggests effective project management strategies the staff can use before the onset of a new project as well as strategies to help define the project, to deliver the project, and to close and review the project. This article also describes five reasons medical practices often fail at project management and suggests more effective approaches that will ensure that the projects the medical practice undertakes are completed well, on time, and within budget.

  5. The Camp Hill Project: Objectives and Design

    Science.gov (United States)

    Mattingly, John B.

    1976-01-01

    Available from: EC 090 474. Outlined are the problems and objectives of Pennsylvania's Camp Hill Project--a program designed to complete psychological needs assessments for juveniles incarcerated at Camp Hill, to develop project policies and guidelines in preparation for meeting with juvenile court judges, and to hire staff. (SBH)

  6. [Outcomes evaluation of the school staff health promotion project].

    Science.gov (United States)

    Woynarowska-Sołdan, Magdalena

    This article presents selected outcomes of a 3-year project "Health promotion of school staff in health-promoting schools," as well as the achievements and difficulties in its implementation. The research was conducted on 644 teachers and 226 members of non-teaching staff in 21 schools. The method involved opinion poll and authored questionnaires. A 2-part model of outcome evaluation was developed. Most participants appreciated the changes that took place within the 3 years of the project implementation. These included the improved level of their knowledge about health, health-conducive behaviors (62-93%) and the physical and social environment of the school (50-92%). Changes were more frequently acknowledged by teachers. About 80% of the participants had a positive attitude to the project, but only 20% assessed their involvement as considerable. About 90% believed that health promotion activities should be continued. According to the project leaders, insufficient support and financial resources, and difficulties in motivating school employees, particularly the nonteaching staff, to undertake health-promotion activities were the major handicaps in the project implementation. The project outcomes can be assessed as satisfying. They revealed that it is posssible to initiate health promotion among school staff. This can be effective on condition that participants are motivated, actively engaged in the project and supported by the head teacher and the local community. Necessarily, school leaders should be prepared to promote health among adults and to gain support from school policy decision makers, school administration, trade unions and universities involved in teacher training. Med Pr 2016;67(2):187-200. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  7. Outcomes evaluation of the school staff health promotion project

    Directory of Open Access Journals (Sweden)

    Magdalena Woynarowska-Sołdan

    2016-04-01

    Full Text Available Background: This article presents selected outcomes of a 3-year project “Health promotion of school staff in health-promoting schools,” as well as the achievements and difficulties in its implementation. Material and Methods: The research was conducted on 644 teachers and 226 members of non-teaching staff in 21 schools. The method involved opinion poll and authored questionnaires. A 2-part model of outcome evaluation was developed. Results: Most participants appreciated the changes that took place within the 3 years of the project implementation. These included the improved level of their knowledge about health, health-conducive behaviors (62–93% and the physical and social environment of the school (50–92%. Changes were more frequently acknowledged by teachers. About 80% of the participants had a positive attitude to the project, but only 20% assessed their involvement as considerable. About 90% believed that health promotion activities should be continued. According to the project leaders, insufficient support and financial resources, and difficulties in motivating school employees, particularly the nonteaching staff, to undertake health-promotion activities were the major handicaps in the project implementation. Conclusions: The project outcomes can be assessed as satisfying. They revealed that it is posssible to initiate health promotion among school staff. This can be effective on condition that participants are motivated, actively engaged in the project and supported by the head teacher and the local community. Necessarily, school leaders should be prepared to promote health among adults and to gain support from school policy decision makers, school administration, trade unions and universities involved in teacher training. Med Pr 2016;67(2:187–200

  8. JS3P: junior staff programme pilot project

    International Nuclear Information System (INIS)

    Pretrel, H.; Tregoures, N.; Bessiron, V.; Dehoyos, A.; Delvallee, I.; Brisson, N.; Debayle, C.; Dubreuil, M.; Nicaise, G.; Perignon, J.P.; Richard, J.; Reinke, N.; Kaulard, J.; Burgener, M.; Keesmann, S.; Schramm, B.; Seubert, A.; Sternkopf, J.; Thuma, G.; Weber, S.; Smidts, O.; Maillet, E.; Bucalossi, A.; Van haesendonck, M.; Uyttenhove, W.; Mertens, J.

    2006-01-01

    Concept: The objective of the project is to allow junior staff members from the European Technical Safety Organisations (TSOs), IRSN, GRS and AVN, to work together with the final goal of creating a junior staff network, based on technical, cultural and personal interests. These projects are to show junior staff members at a very early stage during their career the need for European collaborations. They are also a tool to explore new subjects of co-operation. It is an initiative that should strengthen the links between the organisations and contribute to establishing the future of nuclear safety in Europe. A JS3P (Junior Staff Programme Pilot Project) is a project done jointly by 'junior' staff members from the three TSOs, where experience of 'seniors' is also integrated when needed. Compared to other collaborative activities, it has certain specific features. The JS3P favours staff exchanges, and technical meetings of several days should be planned during a project in order to encourage people to work together. Technical objectives are shared and the work is done jointly (reports, articles). The team involved in the JS3P should be as small as possible to favour its efficiency. The JS3P is short and easy to realize. Its duration is fixed to a maximum of about 12 months with the option to be prolonged. Typical topics are bibliographic work, comparison issues, scientific surveys, benchmark exercises and prospective investigations on innovative ideas. They can be linked to existing joint projects and then form a smaller module integrated into the large project. Topics may concern prospective issues, tentatively investigating new topics that can be seen as exploratory co-operation projects. Subjects may also concern research issues that are not a priority but that deserve to be investigated as new attractive topics. The JS3P is defined and managed by junior staff members. It is approved by a management board committee and supervised by a technical steering committee

  9. Staff Group Trainer: Development of a Computer-Driven, Structured, Staff Training Environment

    National Research Council Canada - National Science Library

    Koger, Milton

    1998-01-01

    .... The project produced two training support packages (TSP)--battalion and brigade--designed to train these staffs to more effectively and efficiently communicate within and between staff sections, command post, and the unit commander...

  10. Optimization education after project implementation: sharing "lessons learned" with staff.

    Science.gov (United States)

    Vaughn, Susan

    2011-01-01

    Implementations involving healthcare technology solutions focus on providing end-user education prior to the application going "live" in the organization. Benefits to postimplementation education for staff should be included when planning these projects. This author describes the traditional training provided during the implementation of a bar-coding medication project and then the optimization training 8 weeks later.

  11. The JET Project (Design proposal)

    International Nuclear Information System (INIS)

    1976-01-01

    This proposal describes a large Tokamak experiment, which aims to study plasma behavior in conditions and dimensions approaching those required in a fusion reactor. The maximum plasma minor radius (a) is 1.25 m and the major radius R 0 is 2.96 m. An important feature is the flexibility to study, for plasma currents in the 1→3 MA range, a wide range of aspect ratios R 0 /a=2.37→5), toroidal magnetic fields (up to 3.6T), minor radii (0.6→1.25 m) and elongation ratios (b/a=1→3.5). The cost of the apparatus, power supplies, plasma heating equipment and specific diagnostics is estimated as 70.1 Muc (March 1975 prices, 1 uc=50 FB). The total construction phase cost including commissioning, buildings and staff is 135 Muc. These figures include an average overall contingency of 30%. The construction time for the project is estimated at 5 years and requires 370 professional man years of effort in the construction organisation with additional effort deployed by the Associated Laboratories in such areas as diagnostics and plasma heating. This design proposal is arranged as follows: The preface gives an introduction to the field of fusion research and relates JET to the European and international programmes. Chapter I is a concise summary of the design proposal, it describes the objectives of research with JET, and gives a brief description of: the apparatus; the cost and construction schedules; the proposed experimental programme and the possible modes of operation of the device. A detailed account of the project is given in the rest of the report of which Chapters IV and VII comprise the engineering design and the staff and cost estimates respectively

  12. Operational Work System Design and Staff Performance in the Nigerian Construction Industry

    Directory of Open Access Journals (Sweden)

    Emmanuel Ejikeme Isichei

    2017-03-01

    Full Text Available Objective: The study investigated the impact of operational work system design on staff performance in selected construction firms in Nigeria. Research Design & Methods: The study used primary data gathered with the use of a 5-point Likert scale questionnaire format administered to 138 respondents. A hypothesis was postulated to test the significance of the research problem. Data analysis was carried out using correlation and multiple regression analysis which proved the significance of the alternative hypothesis as a result of testing the hypothesis. Findings: The findings show that there is a significant relationship between operational work system design and staff performance. The study concludes that operational job design can be advanced as a motivation tool, which is non-monetary in nature, to improve staff performance. Implications & Recommendations: A key drive to improve performance is the satisfaction of staff coupled with an outstanding operational job design which takes into consideration the total physical and mental well-being of staff and its interaction with other organisational factors. The study recommends, among others, that there should be active participation of staff in the design of work in the organisation. Contribution & Value Added: The study provides an empirical approach to enhancing performance in the construction industry and thereby developing an indigenous firm to compete favourably on a growing market.

  13. The Impact of an Implementation Project on Primary Care Staff Perceptions of Delivering Brief Alcohol Advice

    Directory of Open Access Journals (Sweden)

    Hanna Reinholdz

    2016-01-01

    Full Text Available Objective. To explore how the perceptions and experiences of working with risky drinkers change over time among primary health care staff during a systematic implementation project. Methods. Qualitative focus group interviews took place before and after the implementation of the project. Results. The staff displayed a positive change during the implementation period with regard to awareness, knowledge, and confidence that led to a change in routine practice. Throughout the project, staff were committed to engaging with risky drinkers and appeared to have been learning-by-doing. Conclusions. The results indicated a positive attitude to alcohol prevention work but staff lack knowledge and confidence in the area. The more practical experience during the study is, the more confidence seems to have been gained. This adds new knowledge to the science of implementation studies concerning alcohol prevention measures, which have otherwise shown disappointing results, emphasizing the importance of learning in practice.

  14. Design in mind: eliciting service user and frontline staff perspectives on psychiatric ward design through participatory methods.

    Science.gov (United States)

    Csipke, Emese; Papoulias, Constantina; Vitoratou, Silia; Williams, Paul; Rose, Diana; Wykes, Til

    2016-01-01

    Psychiatric ward design may make an important contribution to patient outcomes and well-being. However, research is hampered by an inability to assess its effects robustly. This paper reports on a study which deployed innovative methods to capture service user and staff perceptions of ward design. User generated measures of the impact of ward design were developed and tested on four acute adult wards using participatory methodology. Additionally, inpatients took photographs to illustrate their experience of the space in two wards. Data were compared across wards. Satisfactory reliability indices emerged based on both service user and staff responses. Black and minority ethnic (BME) service users and those with a psychosis spectrum diagnosis have more positive views of the ward layout and fixtures. Staff members have more positive views than service users, while priorities of staff and service users differ. Inpatient photographs prioritise hygiene, privacy and control and address symbolic aspects of the ward environment. Participatory and visual methodologies can provide robust tools for an evaluation of the impact of psychiatric ward design on users.

  15. Student and Staff Perceptions of Key Aspects of Computer Science Engineering Capstone Projects

    Science.gov (United States)

    Olarte, Juan José; Dominguez, César; Jaime, Arturo; Garcia-Izquierdo, Francisco José

    2016-01-01

    In carrying out their capstone projects, students use knowledge and skills acquired throughout their degree program to create a product or provide a technical service. An assigned advisor guides the students and supervises the work, and a committee assesses the projects. This study compares student and staff perceptions of key aspects of…

  16. Integration of Staff Development and Research: Description of the Staff Development Project in Progress for the School Year 1975-1976. Technical Report #62.

    Science.gov (United States)

    Speidel, Gisela E.

    This report from the Kamehameha Early Education Program (KEEP) describes the 1975-76 KEEP staff development program, which was designed to integrate staff development and research. Specific purposes of the program were: (1) to develop the abilities of the teaching staff in teaching, consultation, and research; (2) to conduct pilot research in…

  17. The JET project (design proposal)

    International Nuclear Information System (INIS)

    1976-03-01

    This proposal describes a large Tokamak experiment, which aims to study plasma behavior in conditions and dimensions approaching those required in a fusion reactor. The maximum plasma minor radius (a) is 1.25m and the major radius (R 0 ) is 2.96m. An important feature is the flexibility to study, for plasma currents in the 1→3MA range, a wide range of aspect ratios (R 0 /a=2.37→5), toroidal magnetic fields (up to 3.6T), minor radii (0.6→1.25m) and elongation ratios (b/a=1→3.5). The cost of the apparatus, power supplies, plasma heating equipment and specific diagnostics is estimated as 70.1Muc (march 1975 prices, 1uc=50FB). The total construction phase cost including commissioning, buildings and staff is 135Muc. These figures include an average overall contingency of 30%. The construction time for the project is estimated at 5 years and requires 370 professional man years of effort in the construction organisation with additional effort deployed by the Associated Laboratories in such areas as diagnostics and plasma heating. This design proposal is arranged as follows: an introduction to the field of fusion research is given and relates JET to the European and international programmes; a concise summary of the design proposal describes the objectives of research with JET, and gives a brief description of the apparatus, the cost and construction schedules, the proposed experimental programme and the possible modes of operation of the device. A detailed account of the engineering design and the staff and cost estimates is presented

  18. Staff Helping Attain Relevant Education (Project SHARE): Final Evaluation Report, 1992-93. OREA Report.

    Science.gov (United States)

    Ranadive, Jyoti

    Project SHARE (Staff Helping Attain Relevant Education), a project funded by Title VII of the Elementary and Secondary Education Act, was in its third and final year of operation in 1992-93, in eight primary schools in the Bronx, Brooklyn, and Manhattan (New York). The project served 141 limited English proficient students from low-income families…

  19. Interior design preferences of residents, families, and staff in two nursing homes.

    Science.gov (United States)

    Miller, D B; Goldman, L E; Woodman, S A

    1985-01-01

    The small number of respondents and the absence of specific demographic data concerning the three categories of respondents represented definite limitations. Further investigation in other long-term care facilities clearly is indicated. However, as a preliminary survey of preferences in nursing home interior design, several interesting findings have emerged: Patients, staff and families all emphasized patient safety and function over aesthetics. Yet, more residents than staff and families were concerned with appearance. Although experts advocate creating a home-like atmosphere in the nursing home, 50% or more of each group applied different criteria for specific design elements for private homes and for long-term care institutions. Design preferences for the three groups were similar, with an emphasis on modern furniture, painted walls, resilient tile rather than carpet, blinds, pastel and warm colors, and the use of paintings as accessories. Contrary to study assumptions, design features that promote patient individuality (e.g., patient artwork) received much greater emphasis from staff than from patients and families. Environmental change was considered an important aspect of interior design. Of the three constituencies, staff was most aware of periodic changes in decor and considered change as "very important" more often than did families or patients. As the nature of the nursing home patient population has changed--with residents presenting more disability and less rehabilitation potential and less likelihood of returning home--the ambiance of facilities has assumed even more importance. Clearly, the design preferences of residents who live in the facility are of paramount importance. However, it is also helpful to have an environment that is pleasing to family members who often experience difficulty in ongoing visitations, particularly to intellectually impaired relatives. Maintaining staff morale at a high level is a constant challenge in a long-term care

  20. Staff Technical Position on geological repository operations area underground facility design: Thermal loads

    International Nuclear Information System (INIS)

    Nataraja, M.S.

    1992-12-01

    The purpose of this Staff Technical Position (STP) is to provide the US Department of Energy (DOE) with a methodology acceptable to the Nuclear Regulatory Commission staff for demonstrating compliance with 10 CFR 60.133(i). The NRC staff's position is that DOE should develop and use a defensible methodology to demonstrate the acceptability of a geologic repository operations area (GROA) underground facility design. The staff anticipates that this methodology will include evaluation and development of appropriately coupled models, to account for the thermal, mechanical, hydrological, and chemical processes that are induced by repository-generated thermal loads. With respect to 10 CFR 60.133(i), the GROA underground facility design: (1) should satisfy design goals/criteria initially selected, by considering the performance objectives; and (2) must satisfy the performance objectives 10 CFR 60.111, 60.112, and 60.113. The methodology in this STP suggests an iterative approach suitable for the underground facility design

  1. Integrated project scheduling and staff assignment with controllable processing times.

    Science.gov (United States)

    Fernandez-Viagas, Victor; Framinan, Jose M

    2014-01-01

    This paper addresses a decision problem related to simultaneously scheduling the tasks in a project and assigning the staff to these tasks, taking into account that a task can be performed only by employees with certain skills, and that the length of each task depends on the number of employees assigned. This type of problems usually appears in service companies, where both tasks scheduling and staff assignment are closely related. An integer programming model for the problem is proposed, together with some extensions to cope with different situations. Additionally, the advantages of the controllable processing times approach are compared with the fixed processing times. Due to the complexity of the integrated model, a simple GRASP algorithm is implemented in order to obtain good, approximate solutions in short computation times.

  2. Integrated Project Scheduling and Staff Assignment with Controllable Processing Times

    Directory of Open Access Journals (Sweden)

    Victor Fernandez-Viagas

    2014-01-01

    Full Text Available This paper addresses a decision problem related to simultaneously scheduling the tasks in a project and assigning the staff to these tasks, taking into account that a task can be performed only by employees with certain skills, and that the length of each task depends on the number of employees assigned. This type of problems usually appears in service companies, where both tasks scheduling and staff assignment are closely related. An integer programming model for the problem is proposed, together with some extensions to cope with different situations. Additionally, the advantages of the controllable processing times approach are compared with the fixed processing times. Due to the complexity of the integrated model, a simple GRASP algorithm is implemented in order to obtain good, approximate solutions in short computation times.

  3. Cultivating Leadership Development for Support Staff.

    Science.gov (United States)

    Russell, Sharon

    1997-01-01

    Describes an urban school district's focus on leadership development for support staff. The project identified and trained 500 front-line supervisors representing office managers, food service managers, head custodians, and district maintenance supervisors. This paper explains program design, objectives, participants, management support, content,…

  4. Exploiting the Potential of CD-ROM Databases: Staff Induction at the University of East Anglia.

    Science.gov (United States)

    Guillot, Marie-Noelle; Kenning, Marie-Madeleine

    1995-01-01

    Overviews a project exploring the possibility of using CD-ROM applications and the design of exploratory didactic materials to introduce academic staff to the field of computer-assisted instruction. The project heightened the staff's awareness of electronic resources and their potential as research, teaching, and learning aids, with particular…

  5. Institutional Ethnography as Materialist Framework for Writing Program Research and the Faculty-Staff Work Standpoints Project

    Science.gov (United States)

    LaFrance, Michelle; Nicolas, Melissa

    2012-01-01

    Institutional ethnography seeks to uncover how things happen--how institutional discourse compels and shapes practice(s) and how norms of practice speak to, for, and over individuals. The Faculty and Staff Standpoints project is shaped by this methodology, as it explores writing center staff and faculty relationships to their work. (Contains 10…

  6. Operational Design for Peace Enforcement: Lessons for the Operational Staff

    National Research Council Canada - National Science Library

    Neumann, Michael

    2004-01-01

    U.S. involvement in Somalia serves as a useful case study of the unique challenges an operational staff may face when applying operational design to the planning and execution of a peace enforcement operation. U.S...

  7. A crèche for CERN staff The Staff Association project

    CERN Multimedia

    Association du personnel

    2006-01-01

    For many years, the Staff Association has supported the demand for the creation of a crèche for the children of CERN staff. Several studies have been carried out without leading to a concrete plan. The fact that the CERN population is getting younger and the shortage of local facilities have led to a more urgent demand for this type of social service over the past few years. Furthermore, the Equal Opportunities Panel had already recommended that crèche places be made available.

  8. Impact of engaging middle management in practice interventions on staff support and learning culture: a quasi-experimental design.

    Science.gov (United States)

    Henderson, Amanda; Burmeister, Liz; Schoonbeek, Sue; Ossenberg, Christine; Gneilding, Julieanne

    2014-11-01

    This study evaluated the impact of different levels of engaging middle management in ward based strategies implemented by a project educator. The challenge for learning in practice is to develop effective teams where experienced staff engage and foster learning with students and other novice staff. A quasi-experimental pre- and post- intervention four group design was conducted from November 2009 to May 2010 across four general surgical and four general medical inpatient matched units in two settings in South East Queensland, Australia. Staff survey data was used to compare control and intervention groups (one actively engaging nurse managers) before and after 'practice learning' interventions. The survey comprised demographic data and data from two validated scales (support instrument for nurses facilitating learning and clinical learning organisational culture). Number of surveys returned pre- and post-intervention was 336 from 713 (47%). There were significant differences across many subscales pertaining to staff perception of support in the intervention groups, with only one change in the control group. The number of significant different subscales in the learning culture was also greater when middle management supported the intervention. Middle management should work closely with facilitators to assist embedding practice interventions. © 2013 John Wiley & Sons Ltd.

  9. System design projects for undergraduate design education

    Science.gov (United States)

    Batill, S. M.; Pinkelman, J.

    1993-01-01

    Design education has received considerable in the recent past. This paper is intended to address one aspect of undergraduate design education and that is the selection and development of the design project for a capstone design course. Specific goals for a capstone design course are presented and their influence on the project selection are discussed. The evolution of a series of projects based upon the design of remotely piloted aircraft is presented along with students' perspective on the capstone experience.

  10. Staff technical position on regulatory considerations in the design and construction of the exploratory shaft facility

    International Nuclear Information System (INIS)

    Gupta, D.; Peshel, J.; Bunting, J.

    1991-07-01

    The staff of the US Nuclear Regulatory Commission has prepared this staff technical position for the purpose of compiling and further clarifying previous staff positions on regulatory considerations in the design and construction of the exploratory shaft facility (ESF). (The US Department of Energy (DOE) now refers to the ESF as the ''exploratory studies facility.'' DOE's change in terminology does not affect the positions taken in this guidance.) This document lists the key regulations in 10 CFR Part 60 that should be considered in the design and construction of the ESF and presents the staff position statements and corresponding discussions. 13 refs., 1 fig

  11. 34 CFR 75.519 - Dual compensation of staff.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Dual compensation of staff. 75.519 Section 75.519... by a Grantee? Project Staff § 75.519 Dual compensation of staff. A grantee may not use its grantee to pay a project staff member for time or work for which that staff member is compensated from some other...

  12. Staff Development and Instructional Improvement: Response to Robbins and Wolfe.

    Science.gov (United States)

    Anderson, Lorin W.

    1987-01-01

    Critiques the Napa/Vacaville project for being exceptionally well designed yet being ineffective. The key to effective staff development is to find ways of increasing teachers' ability to accept innovations and incorporate them into their teaching repertoires. (MD)

  13. Do staff nurse perceptions of nurse leadership behaviors influence staff nurse job satisfaction? The case of a hospital applying for Magnet® designation.

    Science.gov (United States)

    Bormann, Lorraine; Abrahamson, Kathleen

    2014-04-01

    Nurse managers leadership behaviors influence the job satisfaction of staff nurses. Transformational leadership is 1 of the 5 components associated with the Magnet Recognition Program®. The aim of this study was to examine the relationship between staff nurse perception of nurse manager leadership behavior and staff nurse job satisfaction in a hospital on the Magnet® journey and the influence of nurse manager leadership style on staff nurse job satisfaction. A descriptive, correlational design using a self-report survey with convenience sampling was used for this quantitative research study. Staff nurses completed the Multifactor Leadership Questionnaire 5X Short Form, the Abridged Job Descriptive Index survey, and a demographic questionnaire. Pearson correlations and regression analyses were completed to explore the relationship and influence of nurse manager leadership style on staff nurse job satisfaction. Transformational and transactional leadership styles of nurse managers were positively related to staff nurse overall job satisfaction and satisfaction with opportunity for promotion. Passive-avoidant leadership style of nurse managers was negatively related to staff nurse satisfaction with work, promotion, supervision, and coworker. Satisfaction with nurse manager leadership was a positive influence on overall nurse job satisfaction when separately controlling for the influence of each leadership style. Transformational and transactional leadership styles should be taught and encouraged among nurse managers to positively influence the job satisfaction of staff nurses.

  14. A simulation-based training program improves emergency department staff communication.

    Science.gov (United States)

    Sweeney, Lynn A; Warren, Otis; Gardner, Liz; Rojek, Adam; Lindquist, David G

    2014-01-01

    The objectives of this study were to evaluate the effectiveness of Project CLEAR!, a novel simulation-based training program designed to instill Crew Resource Management (CRM) as the communication standard and to create a service-focused environment in the emergency department (ED) by standardizing the patient encounter. A survey-based study compared physicians' and nurses' perceptions of the quality of communication before and after the training program. Surveys were developed to measure ED staff perceptions of the quality of communication between staff members and with patients. Pretraining and posttraining survey results were compared. After the training program, survey scores improved significantly on questions that asked participants to rate the overall communication between staff members and between staff and patients. A simulation-based training program focusing on CRM and standardizing the patient encounter improves communication in the ED, both between staff members and between staff members and patients.

  15. The design explorer project

    DEFF Research Database (Denmark)

    Pejtersen, Annelise Mark; Sonnenwald, Diane H.; Buur, Jacob

    1997-01-01

    the 'Design Explorer' research project whose goal is to specify requirements for an information system that will effectively help design team members from different domains and organizational cultures to locate and utilize diverse information sources and interact more effectively throughout the design process....... The project introduces a new approach to support of design; instead of design guidelines, support is given by creating a transparent information environment in which designers can navigate freely according to their individual preferences. The project is based on a framework that structures the dimensions......, or categories, of domain information which need to be available for a system or product designer/design team in order to determine the characteristics of the artefact, or object of design. These dimensions include information about the different work domains in which the product plays a role during its lifetime...

  16. Staff Nurse Perceptions of Open-Pod and Single Family Room NICU Designs on Work Environment and Patient Care.

    Science.gov (United States)

    Winner-Stoltz, Regina; Lengerich, Alexander; Hench, Anna Jeanine; OʼMalley, Janet; Kjelland, Kimberly; Teal, Melissa

    2018-06-01

    Neonatal intensive care units have historically been constructed as open units or multiple-bed bays, but since the 1990s, the trend has been toward single family room (SFR) units. The SFR design has been found to promote family-centered care and to improve patient outcomes and safety. The impact of the SFR design NICU on staff, however, has been mixed. The purposes of this study were to compare staff nurse perceptions of their work environments in an open-pod versus an SFR NICU and to compare staff nurse perceptions of the impact of 2 NICU designs on the care they provide for patients/families. A prospective cohort study was conducted. Questionnaires were completed at 6 months premove and again at 3, 9, and 15 months postmove. A series of 1-way analyses of variance were conducted to compare each group in each of the 8 domains. Open-ended questions were evaluated using thematic analysis. The SFR design is favorable in relation to environmental quality and control of primary workspace, privacy and interruption, unit features supporting individual work, and unit features supporting teamwork; the open-pod design is preferable in relation to walking. Incorporating design features that decrease staff isolation and walking and ensuring both patient and staff safety and security are important considerations. Further study is needed on unit design at a microlevel including headwall design and human milk mixing areas, as well as on workflow processes.

  17. Staff Technical Position on consideration of fault displacement hazards in geologic repository design

    International Nuclear Information System (INIS)

    McConnell, K.I.; Lee, M.P.

    1994-09-01

    Nuclear Regulatory Commission regulations for the disposal of spent nuclear fuel and high-level radioactive waste in a geologic repository recognize that fault displacement is a potentially adverse condition. However, they do not prohibit designing the geologic repository against the effects of such a potentially adverse condition. This Staff Technical Position recognizes the acceptability of designing the geologic repository to take into account the attendant effects (e.g., displacement) of faults of regulatory concern and expresses the staff's views on what is needed from the US Department of Energy if it chooses to locate structures, systems, and components important to safety or important to waste isolation in areas that contain faults of regulatory concern

  18. Benefits of co-design in service design projects

    NARCIS (Netherlands)

    Steen, M.; Manschot, M.A.J.; De Koning, N.

    2011-01-01

    In many service design projects, co-design is seen as critical to success and a range of benefits are attributed to co-design. In this paper, we present an overview of benefits of co-design in service design projects, in order to help the people involved to articulate more precisely and

  19. Benefits of Co-design in Service Design Projects

    NARCIS (Netherlands)

    Steen, M.G.D.; Manschot, M.; Koning, N. de

    2011-01-01

    In many service design projects, co-design is seen as critical to success and a range of benefits are attributed to co-design. In this paper, we present an overview of benefits of co-design in service design projects, in order to help the people involved to articulate more precisely and

  20. Designing Project Management

    NARCIS (Netherlands)

    Heintz, John Linke; Lousberg, L.; Wamelink, J.W.F.; Saari, A.; Huovinen, P.

    2016-01-01

    In this paper we introduce the concept of Designing Project Management. On the basis of our earlier work, we suggest that there is still a gap between what is known from recent project management literature and what project managers can structurally help in the effectiveness of their work. Assuming

  1. Design Theory Projectability

    DEFF Research Database (Denmark)

    Baskerville, Richard; Pries-Heje, Jan

    2014-01-01

    design science research is materially prescriptive, it requires a different perspective in developing the breadth of applications of design theories. In this paper we propose different concepts that embody forms of general technological knowledge The concept of projectability, developed originally......Technological knowledge has been characterized as having a scope that is specific to a particular problem. However, the information systems community is exploring forms of design science research that provide a promising avenue to technological knowledge with broader scope: design theories. Because...... as a means of distinguishing realized generalizations from unrealized generalizations, helps explain how design theories, being prescriptive, possess a different form of applicability. The concept of entrenchment describes the use of a theory in many projections. Together these concepts provide a means...

  2. Reengineering the Project Design Process

    Science.gov (United States)

    Casani, E.; Metzger, R.

    1994-01-01

    In response to NASA's goal of working faster, better and cheaper, JPL has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center and the Flight System Testbed. Reengineering at JPL implies a cultural change whereby the character of its design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and cost estimating.

  3. Effects of newly designed hospital buildings on staff perceptions : a pre-post study to validate design decisions

    NARCIS (Netherlands)

    Schreuder, E.J.A.; Heel, L. van; Goedhart, R.; Dusseldorp, E.; Schraagen, J.M.C.; Burdorf, A.

    2015-01-01

    Objective: This study investigates effects of the newly built nonpatient-related buildings of a large university medical center on staff perceptions and whether the design objectives were achieved. Background: The medical center is gradually renewing its hospital building area of 200,000 m.(2) This

  4. 18 CFR 157.37 - Project design.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Project design. 157.37... Seasons for Alaska Natural Gas Transportation Projects § 157.37 Project design. In reviewing any... proposed project has been designed to accommodate the needs of shippers who have made conforming bids...

  5. Reengineering the project design process

    Science.gov (United States)

    Kane Casani, E.; Metzger, Robert M.

    1995-01-01

    In response to the National Aeronautics and Space Administration's goal of working faster, better, and cheaper, the Jet Propulsion Laboratory (JPL) has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Development Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center (PDC) and the Flight System Testbed (FST). Reengineering at JPL implies a cultural change whereby the character of the Laboratory's design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and more accurate cost estimating. These improvements signal JPL's commitment to meeting the challenges of space exploration in the next century.

  6. Job and task analysis for technical staff

    International Nuclear Information System (INIS)

    Toline, B.C.

    1991-01-01

    In September of 1989 Cooper Nuclear Station began a project to upgrade the Technical Staff Training Program. This project's roots began by performing job and Task Analysis for Technical Staff. While the industry has long been committed to Job and Task Analysis to target performance based instruction for single job positions, this approach was unique in that it was not originally considered appropriate for a group as diverse as Tech Staff. Much to his satisfaction the Job and Task Analysis Project was much less complicated for Technical Staff than the author had imagined. The benefits of performing the Job and Task Analysis for Technical Staff have become increasingly obvious as he pursues lesson plan development and course revisions. The outline for this presentation will be as follows: philosophy adopted; preparation of the job survey document; performing the job analysis; performing task analysis for technical staff and associated pitfalls; clustering objectives for training and comparison to existing program; benefits now and in the future; final phase (comparison to INPO guides and meeting the needs of non-degreed engineering professionals); and conclusion. By focusing on performance based needs for engineers rather than traditional academics for training the author is confident the future Technical Staff Program will meet the challenges ahead and will exceed requirements for accreditation

  7. Staff/bed and staff/patient ratios in South African public sector mental ...

    African Journals Online (AJOL)

    Objectives. To document staff/bed and staff/patient ratios in public. sector mental health services in South Africa. Design. Cross-sectional survey. Method. Aquestionnaire was distributed to provincial mental health co-ordinators requesting numbers of full-time equivalent (FTE) staff who provide mental health care at all ...

  8. Visualizing Practices in Project-based Design

    DEFF Research Database (Denmark)

    Whyte, Jennifer; Tryggestad, Kjell; Comi, Alice

    2016-01-01

    Project-based design involves a variety of visual representations, which are evolved to make decisions and accomplish project objectives. Yet, such mediated and distributed ways of working are difficult to capture through ethnographies that examine situated design. A novel approach is developed t...... representations enabled participants in project-based design to develop and share understanding. The complexity of projects and their distributed and mediated nature makes this approach timely and important in addressing new research questions and practical challenges.......Project-based design involves a variety of visual representations, which are evolved to make decisions and accomplish project objectives. Yet, such mediated and distributed ways of working are difficult to capture through ethnographies that examine situated design. A novel approach is developed...... of situated design. This allows the researcher to be nimble, tracing connections across complex engineering projects; reconstructing practices through their visual representations; and observing their effects. Second, it articulates how, in these empirical cases, interaction with a cascade of visual...

  9. The Virtual Design Team: Designing Project Organizations as Engineers Design Bridges

    Directory of Open Access Journals (Sweden)

    Raymond E. Levitt

    2012-08-01

    Full Text Available This paper reports on a 20-year program of research intended to advance the theory and practice of organization design for projects from its current status as an art practiced by a handful of consultants worldwide, based on their intuition and tacit knowledge, to: (1 an “organizational engineering” craft, practiced by a new generation of organizational designers; and (2 an attractive and complementary platform for new modes of “virtual synthetic organization theory research.” The paper begins with a real-life scenario that provided the motivation for developing the Virtual Design Team (VDT, an agent-based project organizational simulation tool to help managers design the work processes and organization of project teams engaged in large, semi-routine but complex and fast-paced projects. The paper sets out the underlying philosophy, representation, reasoning, and validation of VDT, and it concludes with suggestions for future research on computational modeling for organization design to extend the frontiers of organizational micro-contingency theory and expand the range of applicability and usefulness of design tools for project organizations and supply-chain networks based on this theory.

  10. 20% Research & Design Science Project

    Science.gov (United States)

    Spear, Beth A.

    2015-04-01

    A project allowing employees to use 15 % of their time on independent projects was established at 3M in the 1950's. The result of this project included products like post it notes and masking tape. Google allows its employees to use 20% of their time on independently pursued projects. The company values creativity and innovation. Employees are allowed to explore projects of interest to them one day out of the week, 20 % of their work week. Products like AdSense, Gmail, Google Transit, Google News, and Google Talk are the result of this 20 % program. My school is implementing the Next Generation Science Standards (NGSS) as part of our regularly scheduled curriculum review. These new standards focus on the process of learning by doing and designing. The NGSS are very hands on and active. The new standards emphasize learning how to define, understand and solve problems in science and technology. In today's society everyone needs to be familiar with science and technology. This project allows students to develop and practice skills to help them be more comfortable and confident with science and technology while exploring something of interest to them. This project includes three major parts: research, design, and presentation. Students will spend approximately 2-4 weeks defining a project proposal and educating themselves by researching a science and technology topic that is of interest to them. In the next phase, 2-4 weeks, students design a product or plan to collect data for something related to their topic. The time spent on research and design will be dependant on the topic students select. Projects should be ambitious enough to encompass about six weeks. Lastly a presentation or demonstration incorporating the research and design of the project is created, peer reviewed and presented to the class. There are some problems anticipated or already experienced with this project. It is difficult for all students to choose a unique topic when you have large class sizes

  11. Impact of the design of neonatal intensive care units on neonates, staff, and families: a systematic literature review.

    Science.gov (United States)

    Shahheidari, Marzieh; Homer, Caroline

    2012-01-01

    Newborn intensive care is for critically ill newborns requiring constant and continuous care and supervision. The survival rates of critically ill infants and hospitalization in neonatal intensive care units (NICUs) have improved over the past 2 decades because of technological advances in neonatology. The design of NICUs may also have implications for the health of babies, parents, and staff. It is important therefore to articulate the design features of NICU that are associated with improved outcomes. The aim of this study was to explore the main features of the NICU design and to determine the advantages and limitations of the designs in terms of outcomes for babies, parents, and staff, predominately nurses. A systematic review of English-language, peer-reviewed articles was conducted for a period of 10 years, up to January 2011. Four online library databases and a number of relevant professional Web sites were searched using key words. There were 2 main designs of NICUs: open bay and single-family room. The open-bay environment develops communication and interaction with medical staff and nurses and has the ability to monitor multiple infants simultaneously. The single-family rooms were deemed superior for patient care and parent satisfaction. Key factors associated with improved outcomes included increased privacy, increased parental involvement in patient care, assistance with infection control, noise control, improved sleep, decreased length of hospital stay, and reduced rehospitalization. The design of NICUs has implications for babies, parents, and staff. An understanding of the positive design features needs to be considered by health service planners, managers, and those who design such specialized units.

  12. Ombuds’ corner: Let's not confuse students and fellows with missing staff

    CERN Multimedia

    Vincent Vuillemin

    2013-01-01

    One of the main missions of CERN is education. Several programmes are dedicated to training students. Others, like the Fellowship programme, offer graduates to start a career and become professionals in their fields. All these young and fresh people provide very valuable contributions to our Organization.   At the same time, it is important to remember that they (especially the students) are here to learn from our professional staff for their future career. This is the correct exchange: they bring their dedicated work to our projects and they gain experience by working with our staff. There’s no better way to learn than on-the-job. However they should not be considered as missing staff, with the exact same requirements expected from the CERN staff. Potential missing staff in some areas is a separate issue, and educational programmes are not designed to make up for it. On-the-job learning and training are not separated but dynamically linked together, benefiting to both par...

  13. Use of a dementia training designed for nurse aides to train other staff.

    Science.gov (United States)

    Irvine, A Blair; Beaty, Jeff A; Seeley, John R; Bourgeois, Michelle

    2013-12-01

    Problematic resident behaviors may escalate in long-term care facilities (LTCs). If nurse aides (NAs) are not nearby, the nearest staff to intervene may be non-direct care workers (NDCWs), who have little or no dementia training. This pilot research tested Internet dementia-training program, designed for NAs, on NDCWs in a LTC setting. Sixty-eight NDCWs participated, filling out two baseline surveys at 1-month intervals and a posttest survey after training. The surveys included video-situation testing, items addressing psychosocial constructs associated with behavior change, and measures training-acceptance. Paired t tests showed significant positive effects on measures of knowledge, attitudes, self-efficacy, and behavioral intentions, with small-moderate effect sizes. Nursing staff as well as non-health care workers showed improved scores, and the web-site training program was well received by all participants. These results suggest that Internet training may allow staff development coordinators to conserve limited resources by cross-training of different job categories with the same program.

  14. Using life cycle assessment in design for environment education of product development staff

    Energy Technology Data Exchange (ETDEWEB)

    Jauhiainen, H. [Vaisala Oyj, Helsinki (Finland); Kaipainen, J.; Ristolainen, E.; Valkama, J. [Tampere Univ. of Technology, Inst. of Electronics, Tampere (Finland)

    2004-07-01

    The environmental information of the whole life cycle of a product is needed in design for environment (DfE). Therefore, LCA results are possible starting points for the DfE, but the results need to be summarized for a company staff in DfE education. The reliability of results must be taken into consideration, particularly when going into the details of a product. Those issues were examined when the manufacturing phase of the product of Vaisala company was assessed using two different LCA software tools and inventory databases. Differences between the methods and data had an influence on differences of the results. Comparing of those differences helped to show the main reliability issues of LCA for the staff. It was found out that as a background the LCA results were sufficient, whereas LCA based design rules needed further simplification of the results. In that connection, reliability issues and increased subjectivity must be emphasized. (orig.)

  15. Extending Sociotechnical design to project conception

    DEFF Research Database (Denmark)

    Kampf, Constance

    2009-01-01

    between knowledge and technology through knowledge communication processes, cultural and rhetorical contexts. This connection is examined from a process point of view through the development of project goals and objectives to situate technology. The data comes from a Project Management course in which...... the students were asked to design and plan projects to situate a mobile phone game in the social context around a museum in Helsinki or their online course management system.   The paper traces the evolution of students' project goals and objectives with respect to knowledge communication theory, demonstrating...... the potential of knowledge communication concepts for socio-technical design processes, as well as the implications of socio-technical design processes in extending our understanding of knowledge communication. Keywords: Knowledge Communication, Knowledge Management, Socio-Technical Design, Project Management....

  16. Systematic design for trait introgression projects

    OpenAIRE

    Cameron, John N.; Han, Ye; Wang, Lizhi; Beavis, William D.

    2017-01-01

    Key message Using an Operations Research approach, we demonstrate design of optimal trait introgression projects with respect to competing objectives. Abstract We demonstrate an innovative approach for designing Trait Introgression (TI) projects based on optimization principles from Operations Research. If the designs of TI projects are based on clear and measurable objectives, they can be translated into mathematical models with decision variables and constraints that can be translated into ...

  17. Development of Brigade Staff Tasks for the COBRAS II Brigade Staff Exercise

    National Research Council Canada - National Science Library

    Deter, Daniel

    1998-01-01

    ... and development of simulation-based training for the conventional mounted brigade staff. The work was performed under a project called Combined Arms Operations at Brigade Level, Realistically Achieved Through Simulation (COBRAS).

  18. How do I manage and staff for intelligent transportation systems? : thinking outside the box : a cross-cutting study : maximizing project resources and advancing coordination

    Science.gov (United States)

    2000-08-01

    Intelligent transportation systems (ITS) projects often need staff with skills that are not resident in traditional transportation organizations. Therefore, project administrators must sometimes look beyond the usual staffing methods to fill these po...

  19. Behavioral Emergency Response Team: Implementation Improves Patient Safety, Staff Safety, and Staff Collaboration.

    Science.gov (United States)

    Zicko, Cdr Jennifer M; Schroeder, Lcdr Rebecca A; Byers, Cdr William S; Taylor, Lt Adam M; Spence, Cdr Dennis L

    2017-10-01

    Staff members working on our nonmental health (non-MH) units (i.e., medical-surgical [MS] units) were not educated in recognizing or deescalating behavioral emergencies. Published evidence suggests a behavioral emergency response team (BERT) composed of MH experts who assist with deescalating behavioral emergencies may be beneficial in these situations. Therefore, we sought to implement a BERT on the inpatient non-MH units at our military treatment facility. The objectives of this evidence-based practice process improvement project were to determine how implementation of a BERT affects staff and patient safety and to examine nursing staffs' level of knowledge, confidence, and support in caring for psychiatric patients and patients exhibiting behavioral emergencies. A BERT was piloted on one MS unit for 5 months and expanded to two additional units for 3 months. Pre- and postimplementation staff surveys were conducted, and the number of staff assaults and injuries, restraint usage, and security intervention were compared. The BERT responded to 17 behavioral emergencies. The number of assaults decreased from 10 (pre) to 1 (post); security intervention decreased from 14 to 1; and restraint use decreased from 8 to 1. MS staffs' level of BERT knowledge and rating of support between MH staff and their staff significantly increased. Both MS and MH nurses rated the BERT as supportive and effective. A BERT can assist with deescalating behavioral emergencies, and improve staff collaboration and patient and staff safety. © 2017 Sigma Theta Tau International.

  20. NPP-Nuclear Island Design. From conceptual design to Project execution

    International Nuclear Information System (INIS)

    Lanchet, Dominique

    2014-01-01

    The second day opened with the lecture of Dominique Lanchet, Design Senior Vice President at AREVA Engineering and Project. Dominique Lanchet gave us an overview of the steps of a Nuclear Island Design creation from the conceptual design to the project execution, giving the examples of the EPR and ATMEA1 TM nuclear reactors

  1. Design methodology and projects for space engineering

    Science.gov (United States)

    Nichols, S.; Kleespies, H.; Wood, K.; Crawford, R.

    1993-01-01

    NASA/USRA is an ongoing sponsor of space design projects in the senior design course of the Mechanical Engineering Department at The University of Texas at Austin. This paper describes the UT senior design sequence, consisting of a design methodology course and a capstone design course. The philosophical basis of this sequence is briefly summarized. A history of the Department's activities in the Advanced Design Program is then presented. The paper concludes with a description of the projects completed during the 1991-92 academic year and the ongoing projects for the Fall 1992 semester.

  2. Design and validation of a questionnaire to measure the attitudes of hospital staff concerning pandemic influenza.

    Science.gov (United States)

    Naghavi, Seyed Hamid Reza; Shabestari, Omid; Roudsari, Abdul V; Harrison, John

    2012-03-01

    When pandemics lead to a higher workload in the healthcare sector, the attitude of healthcare staff and, more importantly, the ability to predict the rate of absence due to sickness are crucial factors in emergency preparedness and resource allocation. The aim of this study was to design and validate a questionnaire to measure the attitude of hospital staff toward work attendance during an influenza pandemic. An online questionnaire was designed and electronically distributed to the staff of a teaching medical institution in the United Kingdom. The questionnaire was designed de novo following discussions with colleagues at Imperial College and with reference to the literature on the severe acute respiratory syndrome (SARS) epidemic. The questionnaire included 15 independent fact variables and 33 dependent measure variables. A total of 367 responses were received in this survey. The data from the measurement variables were not normally distributed. Three different methods (standardized residuals, Mahalanobis distance and Cook's distance) were used to identify the outliers. In all, 19 respondents (5.17%) were identified as outliers and were excluded. The responses to this questionnaire had a wide range of missing data, from 1 to 74 cases in the measured variables. To improve the quality of the data, missing value analysis, using Expectation Maximization Algorithm (EMA) with a non-normal distribution model, was applied to the responses. The collected data were checked for homoscedasticity and multicollinearity of the variables. These tests suggested that some of the questions should be merged. In the last step, the reliability of the questionnaire was evaluated. This process showed that three questions reduced the reliability of the questionnaire. Removing those questions helped to achieve the desired level of reliability. With the changes proposed in this article, the questionnaire for measuring staff attitudes concerning pandemic influenza can be converted to a

  3. Front-office staff can improve clinical tobacco intervention: health coordinator pilot project.

    Science.gov (United States)

    Bass, Frederic; Naish, Brigham; Buwembo, Isaac

    2013-11-01

    To learn whether front-line personnel in primary care practices can increase delivery of clinical tobacco interventions and also help smokers address physical inactivity, at-risk alcohol use, and depression. Uncontrolled before-and-after design. Vancouver, BC, area (4 practices); northern British Columbia (2 practices). Six practices, with 1 staff person per practice serving as a "health coordinator" who tracked and, after the baseline period, delivered preventive interventions to all patients who smoked. To assess delivery of preventive interventions, each practice was to sample 300 consecutive patient records, both at baseline and at follow-up 15 months later. Front-office staff were recruited, trained, paid, and given ongoing support to provide preventive care. Clinicians supplemented this care with advice and guided the use of medication. Effectiveness of the intervention was based on comparison, at baseline and at follow-up, of the proportion of patients with any of the following 6 proven intervention components documented in their medical records: chart reminder, advice received, self-management plan, target quit date, referral, and follow-up date (as they applied to tobacco, physical inactivity, at-risk alcohol use, and depression). A Tobacco Intervention Flow Sheet cued preventive care, and its data were entered into a spreadsheet (which served as a smokers' registry). Qualitative appraisal data were noted. For tobacco, substantial increases occurred after the intervention period in the proportion of patients with each of the intervention components noted in their charts: chart reminder (20% vs 94%); provision of advice (34% vs 79%); self-management plan (14% vs 57%); target quit date (5% vs 11%); referral (6% vs 11%); and follow-up date (7% vs 42%). Interventions for physical inactivity and depression showed some gains, but there were no gains for at-risk alcohol use. Front-line staff, patients, and clinicians were enthusiastic about the services offered

  4. Instructional Design "Postpartum Fitness” for Midwife Staff of Shemiranat (Tehran, Iran Health Network

    Directory of Open Access Journals (Sweden)

    Rita Rahmati Roodsari

    2018-01-01

    Full Text Available Background: One of the postpartum cares lives is supporting and encouraging them more to exercise after delivery and monitoring them. Health care workers, particularly midwives have a great role in the promotion of sport activity. Purpose of this study is Designed training for "postpartum fitness" by Roth well approach for midwives at health network in Shemiranat.Materials and Methods: This research is kind of Instructional design. Sampling was done by using census method Data collection was done by multiple choice tests for knowledge and attitudes of questionnaire and practical assessment exercise was part. After assessment and instructional design and was done Roth well model and Ganyh strategies.Results: Average response to questions in the cognitive domain was 49%. In this study 92% of the employees have positive attitude to importance and impact of the study. The result of the data related to the workplace of participants is health centers (53.3%. Most frequency is for who has less than 5 years’ work experience (50%and most frequency is for official staff (43.3%, most educational level related to bachelors (83.3% and the highest age rate is between 30-40 years old (40%.Conclusion: Positive attitude towards this issue and earn score below %80 indicates a need for staff to learn and raise awareness about the above topic. Create knowledge, training, counseling mothers about this issue are the midwife duties. This reflects a greater emphasis on design education.

  5. Systematic design for trait introgression projects.

    Science.gov (United States)

    Cameron, John N; Han, Ye; Wang, Lizhi; Beavis, William D

    2017-10-01

    Using an Operations Research approach, we demonstrate design of optimal trait introgression projects with respect to competing objectives. We demonstrate an innovative approach for designing Trait Introgression (TI) projects based on optimization principles from Operations Research. If the designs of TI projects are based on clear and measurable objectives, they can be translated into mathematical models with decision variables and constraints that can be translated into Pareto optimality plots associated with any arbitrary selection strategy. The Pareto plots can be used to make rational decisions concerning the trade-offs between maximizing the probability of success while minimizing costs and time. The systematic rigor associated with a cost, time and probability of success (CTP) framework is well suited to designing TI projects that require dynamic decision making. The CTP framework also revealed that previously identified 'best' strategies can be improved to be at least twice as effective without increasing time or expenses.

  6. Applying Bureaucratic Caring Theory and the Chronic Care Model to Improve Staff and Patient Self-Efficacy.

    Science.gov (United States)

    Potter, Marcia A; Wilson, Candy

    Patient activation and engagement can be powerful enablers for health outcomes that are just as important as staff engagement and satisfaction. The authors applied the Bureaucratic Caring Theory and the Chronic Care Model to a process improvement project designed to link activation, engagement, satisfaction, and health outcomes. Twenty-two adults with diabetes and 7 staff members caring for them participated in a 12-week process improvement project that incorporated a time-based element of longitudinal care with skill-based competencies to provide collaborative, team-based care to patients with type 2 diabetes. Patients completed satisfaction surveys at the end of their clinical encounters. Staff members completed satisfaction surveys pre- and postimplementation. The authors analyzed hemoglobin A1C levels pre- and postimplementation. As engagement and activation increased for both staff and patients, hemoglobin A1C levels decreased. The clinical implication is that the use of Bureaucratic Caring Theory may foster caring while broad application of the Chronic Care Model may improve self-efficacy, create healthier populations, and reduce health care costs.

  7. FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2

    International Nuclear Information System (INIS)

    1991-02-01

    Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes ''end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made

  8. Balancing Design Project Supervision and Learning Facilitation

    DEFF Research Database (Denmark)

    Nielsen, Louise Møller

    2012-01-01

    experiences and expertise to guide the students’ decisions in relation to the design project. This paper focuses on project supervision in the context of design education – and more specifically on how this supervision is unfolded in a Problem Based Learning culture. The paper explores the supervisor......’s balance between the roles: 1) Design Project Supervisor – and 2) Learning Facilitator – with the aim to understand when to apply the different roles, and what to be aware of when doing so. This paper represents the first pilot-study of a larger research effort. It is based on a Lego Serious Play workshop......In design there is a long tradition for apprenticeship, as well as tradition for learning through design projects. Today many design educations are positioned within the University context, and have to be aligned with the learning culture and structure, which they represent. This raises a specific...

  9. Development of a Refined Staff Group Trainer

    National Research Council Canada - National Science Library

    Quensel, Susan

    1999-01-01

    ... individual staff sections in the brigade command post. The program was designed to deliver training to newly formed, inexperienced staffs conducting the staff functions that support the military decision-making process within the execution phase...

  10. 23 CFR 710.313 - Design-build projects.

    Science.gov (United States)

    2010-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY AND ENVIRONMENT RIGHT-OF-WAY AND REAL ESTATE Project Development § 710.313 Design-build projects. (a) In the case of a design-build project, right-of-way must be acquired and cleared in accordance with the Uniform Relocation Assistance...

  11. CTEPP STANDARD OPERATING PROCEDURE FOR CONDUCTING STAFF AND PARTICIPANT TRAINING (SOP-2.27)

    Science.gov (United States)

    This SOP describes the method to train project staff and participants to collect various field samples and questionnaire data for the study. The training plan consists of two separate components: project staff training and participant training. Before project activities begin,...

  12. Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2006-03-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see

  13. The Training Project of Star Researchers, Outstanding Teaching Staff and Leaders with Facilities Available

    Directory of Open Access Journals (Sweden)

    Ömer KARAHAN

    2015-12-01

    Full Text Available There is a general consensus on the requirement of a serious regulation at our universities. It is argued that it is necessary to change Constitution and Institution of Higher Education Law for the serious regulation. However, it is impossible to say that all the facilities of the present legislation are used. Our aim is to create a project based on benefiting from continuing education centers to meet the need of star researchers, outstanding teaching staff and leaders in Turkey via the legislation in force. In this study, accessible studies from publications related to university, higher education and continuing education centers are studied. Th e current situation and solution off ers, applications and continuing education centers'activities have been determined. In accordance with these data, solution off ers have been proposed and discussed in line with the literature. According to the data obtained, our students who come with deficiencies from high schools to universities are not given the adequate undergraduate, graduate and postgraduate education. Th ere are studies such as ‘Double Major Program', ‘Medical-Science Physicians Integrated (MD-PhD Doctorate Program which upgrade the qualities. However, these programs are not suff icient and common. Th erefore, it is imposssible to train outstanding teaching staff , star researchesr and leaders who will meet the needs of our country and contribute to the World. Our academic potential needs a quality training except for branch training. On the other hand, the contribution of the Continuing Education Centers existing in university embodiments is limited. It is possible to provide basic skills, integration and research education to the outstanding teaching staff , star researcher and leader candidates. Th ese trainings should be given in a continuous instutionalization and in the formal education system. For this purpose, an academician school can be established within the body continuing

  14. Information Flows in Networked Engineering Design Projects

    DEFF Research Database (Denmark)

    Parraguez, Pedro; Maier, Anja

    Complex engineering design projects need to manage simultaneously multiple information flows across design activities associated with different areas of the design process. Previous research on this area has mostly focused on either analysing the “required information flows” through activity...... networks at the project level or in studying the social networks that deliver the “actual information flow”. In this paper we propose and empirically test a model and method that integrates both social and activity networks into one compact representation, allowing to compare actual and required...... information flows between design spaces, and to assess the influence that these misalignments could have on the performance of engineering design projects....

  15. 34 CFR 637.13 - What are design projects?

    Science.gov (United States)

    2010-07-01

    ... EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of Projects Does the Secretary Assist Under This Program? § 637.13 What are design projects? (a) Design... 34 Education 3 2010-07-01 2010-07-01 false What are design projects? 637.13 Section 637.13...

  16. Post-Occupancy Evaluation of a Mental Healthcare Facility Based on Staff Perceptions of Design Innovations.

    Science.gov (United States)

    Kalantari, Saleh; Snell, Robin

    2017-07-01

    This study was a post-occupancy evaluation (POE) to examine the effectiveness of three specific design innovations in a mental healthcare facility. In addition to collecting data about the impact of these specific designs, the study provides a model for the broader implementation of POE approaches in the mental healthcare context. POEs in general healthcare settings have been shown to lead to better work environments and better outcomes for patients. Despite growing evidence of the value provided by POE studies, the industry has been somewhat slow to adopt their regular use, in part due to unfamiliarity with the POE process. This is particularly true in mental healthcare contexts, where POE studies remain virtually nonexistent. In-depth interviews and a widely distributed, anonymous survey were used to collect hospital staff perceptions and feedback regarding the impact of specific design features. The hospital staff were quite enthusiastic about two of the design innovations studied here (a new wayfinding strategy and the use of vibrant colors in specific areas of the facility). The third innovation, open-style communication centers, elicited more mixed evaluations. The results include extensive hypothesis testing about the effects of each innovation as well as narrative discussions of their pros and cons. The study generated new knowledge about three specific mental healthcare design innovations and provides a model for the practical implementation of a POE approach in mental healthcare contexts. The results are particularly relevant for designers who are considering innovative strategies in future mental healthcare facilities.

  17. Extending Sociotechnical Design to Project Conception

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    2011-01-01

    Project management processes offer specific sites for understanding the interplay of the social and the technical. This article focuses on the connection between knowledge and technology through knowledge communication processes, cultural & rhetorical contexts in projects, and the iterative process...... and the Aarhus School of Business, University of Aarhus, Denmark. The analysis demonstrates the potential of knowledge communication concepts for social technical design and highlights the cultural context of the designers as a key factor to consider in socio-technical design....

  18. The IICC Project: Integration–Insight–Creativity–Character

    Directory of Open Access Journals (Sweden)

    Gordon Rowland

    2011-01-01

    Full Text Available In March 2009, the president of Ithaca College issued a challenge to faculty and staff to step outside of their disciplinary expertise to create means for students to make connections across academic fields. The design team directly addressed this challenge by proposing four one-credit mini-courses, based on a series of learning activities that revolved around systems thinking and design. Our project was accepted and serves as an example of a formal design inquiry with a systems approach at multiple levels. In this design case, we describe the project history, the course designs, the many issues we have faced, and how we have made design decisions.

  19. Learning from participatory design projects across industries

    DEFF Research Database (Denmark)

    Broberg, Ole; Souza da Conceição, Carolina

    2017-01-01

    Summative Statement: A preliminary framework for participatory design projects (PDP) was developed based on a retrospective analysis of five PDPs across different industries. The framework may serve as a guidance for planning and conducting PDPs. Problem statement: A growing number of experiences...... with participatory design or participatory ergonomics projects have been gained within the field of macro-ergonomics. It is suggested that the Participatory Ergonomics Framework (PEF) validated by Haines et al. (2002) needs to be updated based on these experiences and hence more focussed on design activities....... Research Objective / Question: The objective of this study was to update and design-orient the PEF based on experiences with PDPs within the last ten years. Methodology: Five participatory design projects across different industries were systematically analyzed and compared in order to develop a framework...

  20. Project time boxing and milestones as drivers for open design projects

    DEFF Research Database (Denmark)

    Tollestrup, Christian H. T.

    2015-01-01

    is very positive and that the structure, strict enforcement and rolling project management responsibility in a group work setting really helps them drive the project forward with high motivation. The main challenge lies in the balance between loading the teams with too many challenges and just providing......The Curriculums and programs in Problem Based Learning (PBL) utilizes the project-format in a team based setting for rehearsing the competencies of applying the design-oriented skills and knowledge learned in courses and workshops. If the project period is self-organised, there is a tendency......, because of the facilitated format where ‘disturbances’ are eliminated. If successful the state of creative flow is achieved. So how can we create a sense of urgency in longer project periods, not just workshop format, that would help a team of design students to engage and drive the project from the start...

  1. 77 FR 74195 - Draft Guidance for Industry and Food and Drug Administration Staff; Design Considerations for...

    Science.gov (United States)

    2012-12-13

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2012-D-1161] Draft Guidance for Industry and Food and Drug Administration Staff; Design Considerations for Devices Intended for Home Use; Availability AGENCY: Food and Drug Administration, HHS. ACTION: Notice. SUMMARY: The...

  2. Project management in interior design services

    OpenAIRE

    Şahinoglu, Alp

    1997-01-01

    Ankara : Bilkent University, Department of Interior Architecture and Environmental Design and Institute of Fine Arts, 1997. Thesis (Master's) -- Bilkent University, 1997. Includes bibliographical references. In this study, the concept of project management is analyzed within the framework of interior design services. Project management has been defined as the managing and coordination of all human and physical resources, in order to accomplish the predetermined goals (aim of the proj...

  3. Reference Design Project Book: NUSEL-Homestake

    OpenAIRE

    Haxton, W. C.

    2003-01-01

    This submission includes the overview, science timeline, reference design, WBS, and mine status sections of the Homestake collaboration's Reference Design Project Book. The Project Book describes the specific plan for converting the Homestake Gold Mine into a facility for physics, earth science, and engineering. The proposed developments on the 7400- and 4850-ft levels are presented, along with the plans for adapting Homestake's existing infrastructure for science. The plan differs substantia...

  4. Impact of design of installations and in the personal staff formation of the hybrid equipment: PET-CT

    International Nuclear Information System (INIS)

    Hernandez, R.; Soler, K.; Alonso, I.

    2013-01-01

    In this article the general principles to be considered in the design of a Nuclear Medicine department with PET-CT, and address the existing problems regarding training needs and staff training, to take on this new technology

  5. On-line professional staff development: An evaluation study

    NARCIS (Netherlands)

    de Vries, Linda; Naidu, Som; Jegede, Olugbemiro; Collis, Betty

    1995-01-01

    This paper reports the design, implementation, and evaluation of a teleseminar on instructional design (ID) and computer-mediated communication (CMC) for the purposes of staff development at The University of Southern Queensland, Toowoomba, Australia. Participation was open to any staff with an

  6. The perceived stress and turnover intention of direct-care staff of community residential facilities

    OpenAIRE

    Lightle, Kevin Eugene

    1990-01-01

    This study examines turnover among direct-care staff of community residential facilities. Turnover is of concern as the projected rate indicated by direct-care staff is 34%. A review of personnel records project an annual turnover rate of 40%. Stress is examined for its relationship to turnover. The Maslach Burnout Inventory is used to measure the perceived stress level of staff. Results indicate direct-care staff are not stressed to the point of burnout in two of ...

  7. Project-Based Learning and Design-Focused Projects to Motivate Secondary Mathematics Students

    Science.gov (United States)

    Remijan, Kelly W.

    2017-01-01

    This article illustrates how mathematics teachers can develop design-focused projects, related to project-based learning, to motivate secondary mathematics students. With first-hand experience as a secondary mathematics teacher, I provide a series of steps related to the engineering design process, which are helpful to teachers in developing…

  8. 340 Facility Secondary Containment and Leak Detection Project W-302 Functional Design Criteria

    Energy Technology Data Exchange (ETDEWEB)

    Stordeur, R.T.

    1995-03-01

    This functional design criteria for the upgrade to the 340 radioactive liquid waste storage facility (Project W-302) specifically addresses the secondary containment issues at the current vault facility of the 340 Complex. This vault serves as the terminus for the Radioactive Liquid Waste System (RLWS). Project W-302 is necessary in order to bring this portion of the Complex into full regulatory compliance. The project title, ``340 Facility Secondary Containment and Leak Detection``, illustrates preliminary thoughts of taking corrective action directly upon the existing vault (such as removing the tanks, lining the vault, and replacing tanks). However, based on the conclusion of the engineering study, ``Engineering Study of the 300 Area Process Wastewater Handling System``, WHC-SD-WM-ER-277 (as well as numerous follow-up meetings with cognizant staff), this FDC prescribes a complete replacement of the current tank/vault system. This offers a greater array of tanks, and provides greater operating flexibility and ease of maintenance. This approach also minimizes disruption to RLWS services during ``tie-in``, as compared to the alternative of trying to renovate the old vault. The proposed site is within the current Complex area, and maintains the receipt of RLWS solutions through gravity flow.

  9. A Systems View of the USMA Staff Redesign

    National Research Council Canada - National Science Library

    McGinnis, Mike L

    2004-01-01

    ...; a major hindrance to the Academy's pursuit of excellence and higher performance. This report presents a USMA staff design that will align and enhance the synergy between USMA staff elements, lower levels staffs, and the West Point Garrison Command.

  10. What do surgical oncology staff nurses know about colorectal cancer ostomy care?

    Science.gov (United States)

    Gemmill, Robin; Kravits, Kathy; Ortiz, Mildred; Anderson, Casandra; Lai, Lily; Grant, Marcia

    2011-02-01

    For most patients diagnosed with colorectal cancer, dealing with the adjustment and rehabilitation after treatment can be overwhelming. There is a significant need for expert educational and counseling support, especially for the patient with a new ostomy. This pilot study describes acute care oncology staff nurses' knowledge about and attitudes toward providing direct ostomy care support and education. This study is part of a larger project assessing gaps in education and services in support of patients with colorectal cancer. The Survey on Ostomy Care questionnaire designed to assess nurses' knowledge about and attitudes toward ostomy care was administered to oncology staff nurses at a comprehensive cancer center. Only 30% of staff nurses surveyed strongly agreed or agreed with the statement, "I care for ostomy patients often enough to keep up my skills in ostomy care." Maintaining staff nurses' ability to teach and demonstrate to patients complex care such as ostomy care depends on the ability to practice both education and hands-on skills. Staff nurses identify that lack of opportunity to care for the new ostomy patient influences their ability to maintain skill expertise. The results show the need to explore the provision of ongoing staff education for low-volume patient populations using creative teaching strategies, such as clinical simulation and short videos. Copyright 2011, SLACK Incorporated.

  11. 10 CFR 2.709 - Discovery against NRC staff.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Discovery against NRC staff. 2.709 Section 2.709 Energy... Rules for Formal Adjudications § 2.709 Discovery against NRC staff. (a)(1) In a proceeding in which the NRC staff is a party, the NRC staff will make available one or more witnesses, designated by the...

  12. Radiation monitoring of PET staff

    International Nuclear Information System (INIS)

    Trang, A.

    2004-01-01

    Full text: Positron emission tomography (PET) is becoming a common diagnostic tool in hospitals, often located in and employing staff from the Nuclear Medicine or Radiology departments. Although similar in some ways, staff in PET departments are commonly found to have the highest radiation doses in the hospital environment due to unique challenges which PET tracers present in administration as well as production. The establishment of a PET centre with a dedicated cyclotron has raised concerns of radiation protection to the staff at the WA PET Centre and the Radiopharmaceutical Production and Development (RAPID) team. Since every PET centre has differing designs and practices, it was considered important to closely monitor the radiation dose to our staff so that improvements to practices and design could be made to reduce radiation dose. Electronic dosimeters (MGP DMC 2000XB), which have a facility to log time and dose at 10 second intervals, were provided to three PET technologists and three PET nurses. These were worn in the top pocket of their lab coats throughout a whole day. Each staff member was then asked to note down their duties throughout the day and also note the time they performed each duty. The duties would then correlate with the dose with which the electronic monitor recorded and an estimate of radiation dose per duty could be given. Also an estimate of the dose per day to each staff member could be made. PET nurses averaged approximately 20 μ8v per day getting their largest dose from caring for occasional problematic patients. Smaller doses of a 1-2 μ8v were recorded for injections and removing cannulas. PET technologists averaged approximately 15 μ8v per day getting their largest dose of 1-5μ8v mainly from positioning of patients and sometimes larger doses due to problematic patients. Smaller doses of 1-2 μ5v were again recorded for injections and removal of cannulas. Following a presentation given to staff, all WA PET Centre and RAPID staff

  13. Doing the Project and Learning the Content: Designing Project-Based Science Curricula for Meaningful Understanding

    Science.gov (United States)

    Kanter, David E.

    2010-01-01

    Project-based science curricula can improve students' usable or meaningful understanding of the science content underlying a project. However, such curricula designed around "performances" wherein students design or make something do not always do this. We researched ways to design performance project-based science curricula (pPBSc) to better…

  14. Research oriented projects on design themese

    DEFF Research Database (Denmark)

    Tollestrup, Christian; Eriksen, Kaare; Ovesen, Nis

    2011-01-01

    How can design students do research-oriented projects about design themes? At the 3rd semester at the Industrial Design Master Program at Aalborg University this is done by taking research oriented learning objectives on design theories and methods and combining them with experimental case studie...... and professional self-reflection amongst students are improved....

  15. The Healy Clean Coal Project: Design verification tests

    International Nuclear Information System (INIS)

    Guidetti, R.H.; Sheppard, D.B.; Ubhayakar, S.K.; Weede, J.J.; McCrohan, D.V.; Rosendahl, S.M.

    1993-01-01

    As part of the Healy Clean Coal Project, TRW Inc., the supplier of the advanced slagging coal combustors, has successfully completed design verification tests on the major components of the combustion system at its Southern California test facility. These tests, which included the firing of a full-scale precombustor with a new non-storage direct coal feed system, supported the design of the Healy combustion system and its auxiliaries performed under Phase 1 of the project. Two 350 million BTU/hr combustion systems have been designed and are now ready for fabrication and erection, as part of Phase 2 of the project. These systems, along with a back-end Spray Dryer Absorber system, designed and supplied by Joy Technologies, will be integrated with a Foster Wheeler boiler for the 50 MWe power plant at Healy, Alaska. This paper describes the design verification tests and the current status of the project

  16. Managing the human factor in information security how to win over staff and influence business managers

    CERN Document Server

    Lacey, David

    2009-01-01

    With the growth in social networking and the potential for larger and larger breaches of sensitive data,it is vital for all enterprises to ensure that computer users adhere to corporate policy and project staff design secure systems. Written by a security expert with more than 25 years'' experience, this book examines how fundamental staff awareness is to establishing security and addresses such challenges as containing threats, managing politics, developing programs, and getting a business to buy into a security plan. Illustrated with real-world examples throughout, this is a must-have guide for security and IT professionals.

  17. Design of a projection display screen with vanishing color shift for rear-projection HDTV

    Science.gov (United States)

    Liu, Xiu; Zhu, Jin-lin

    1996-09-01

    Using bi-convex cylinder lens with matrix structure, the transmissive projection display screen with high contrast and wider viewing angle has been widely used in large rear projection TV and video projectors, it obtained a inhere color shift and puzzled the designer of display screen for RGB projection tube in-line adjustment. Based on the method of light beam racing, the general software of designing projection display screen has been developed and the computer model of vanishing color shift for rear projection HDTV has bee completed. This paper discussed the practical designing method to vanish the defect of color shift and mentioned the relations between the primary optical parameters of display screen and relative geometry sizes of lens' surface. The distributions of optical gain to viewing angle and the influences on engineering design are briefly analyzed.

  18. 76 FR 17160 - Office of New Reactors; Final Interim Staff Guidance on the Review of Nuclear Power Plant Designs...

    Science.gov (United States)

    2011-03-28

    ... design certification (DC) application for new nuclear power reactors under Title 10 of the Code of... NUCLEAR REGULATORY COMMISSION [NRC-2010-0033; DC/COL-ISG-021] Office of New Reactors; Final Interim Staff Guidance on the Review of Nuclear Power Plant Designs Using a Gas Turbine Driven Standby...

  19. Various advanced design projects promoting engineering education

    Science.gov (United States)

    1994-01-01

    The Universities Space Research Association (USRA) Advanced Design Program (ADP) program promotes engineering education in the field of design by presenting students with challenging design projects drawn from actual NASA interests. In doing so, the program yields two very positive results. Firstly, the students gain a valuable experience that will prepare them for design problems with which they will be faced in their professional careers. Secondly, NASA is able to use the work done by students as an additional resource in meeting its own design objectives. The 1994 projects include: Universal Test Facility; Automated Protein Crystal Growth Facility; Stiffening of the ACES Deployable Space Boom; Launch System Design for Access to Space; LH2 Fuel Tank Design for SSTO Vehicle; and Feed System Design for a Reduced Pressure Tank.

  20. Project Design Concept for Monitoring and Control System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations

  1. 18 CFR 388.104 - Informal advice from Commission staff.

    Science.gov (United States)

    2010-04-01

    ... Commission staff. 388.104 Section 388.104 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... Commission staff. (a) The Commission staff provides informal advice and assistance to the general public and... expressed by the staff do not represent the official views of the Commission, but are designed to aid the...

  2. Mapping and industrial IT project to a 2nd semester design-build project

    DEFF Research Database (Denmark)

    Nyborg, Mads; Høgh, Stig

    2010-01-01

    CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project in the D......CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project...... in the Diploma IT program at the Technical University of Denmark. The system in question is a weighing system operating in a LAN environment. The system is used in the medical industry for producing tablets. We present the design of a curriculum to support the development of major components of the weighing...... system. A simple teaching model for software engineering is presented which combines technical disciplines with disciplines from section 2-4 in the CDIO syllabus. The implementation of a joint project involving several courses supports the CDIO perspective. Already the traditional IT-diploma education...

  3. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-03-12

    Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.

  4. Designing and Implementing a Unique Website Design Project in an Undergraduate Course

    Science.gov (United States)

    Kontos, George

    2016-01-01

    The following paper describes a distinctive collaborative service-learning project done in an undergraduate class on web design. In this project, students in a web design class contacted local community non-profit organizations to create websites (collections of web pages) to benefit these organizations. The two phases of creating a website,…

  5. Adapt! – Agile Project Management Supported by Axiomatic Design

    Directory of Open Access Journals (Sweden)

    Weber Jakob

    2017-01-01

    Full Text Available This paper presents a novel approach for the use of Axiomatic Design Theory in combination with agile project management methods like Scrum for an effective, structured and combined product design and development process. Agile project management methods give a guideline how to manage a project, but there is only minor assistance regarding the actual product development process itself. Axiomatic Design can be used to support these methods in this point. In concrete terms, the results of the decomposition process of this theory can be used to formulate and structure the work packages for the agile project managing process. The Independence Axiom of Axiomatic Design Theory has a substantial contribution by ensuring the independence of the work packages which can be assigned to different project team members and can be processed independently by them. The combination of the different methods not only helps to ensure a good design solution but also helps to work more agile within a project team. The here proposed approach is one part of a holistic product design and development process for changeable production units – called Adapt! – and is described within a use case in the automotive sector.

  6. Project Excel: A Model for an Individually Focused Staff Development Program.

    Science.gov (United States)

    Minix, Nancy A.; Pearce, Winston Thomas

    A description is given of the development and implementation of an inservice program, "Project Excel," which was designed in accordance with andragogical theory. This theory is based upon four major assumptions: (1) as people grow, they become increasingly self-directed; (2) as people grow, a reservoir of experiences which provide a…

  7. PNNL Apatite Investigation at 100-NR-2 Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2009-04-02

    In 2004, the U.S. Department of Energy, Fluor Hanford, Inc., Pacific Northwest National Laboratory (PNNL), and the Washington Department of Ecology agreed that the long-term strategy for groundwater remediation at the 100-N Area would include apatite sequestration as the primary treatment, followed by a secondary treatment if necessary. Since then, the agencies have worked together to agree on which apatite sequestration technology has the greatest chance of reducing strontium-90 flux to the Columbia River. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by staff working on the PNNL Apatite Investigation at 100-NR-2 Project. The plan is designed to be used exclusively by project staff.

  8. Educating Academic Staff to Reorient Curricula in ESD

    Science.gov (United States)

    Biasutti, Michele; Makrakis, Vassilios; Concina, Eleonora; Frate, Sara

    2018-01-01

    Purpose: The purpose of this paper is to present a professional development experience for higher education academic staff within the framework of an international Tempus project focused on reorienting university curricula to address sustainability. The project included revising curricula to phase sustainable development principles into university…

  9. Personal Sustainability: Listening to Extension Staff and Observing Organizational Culture

    Science.gov (United States)

    Forstadt, Leslie; Fortune, Aileen

    2016-01-01

    Extension staff are increasingly challenged to do excellent work and balance their lives. University of Maine Cooperative Extension committed to a 2-year participatory action research project to support staff and to an organizational climate that encourages personal sustainability. With tools from ethnography and appreciative inquiry, staff…

  10. Knowledge management in design teams using a project website

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for

  11. Project Design Concept - Primary Ventilation System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    Tank Farm Restoration and Safe Operation (TFRSO), Project W-3 14 was established to provide upgrades that would improve the reliability and extend the system life of portions of the waste transfer, electrical, ventilation, instrumentation and control systems for the Hanford Site Tank Farms. An assessment of the tank farm system was conducted and the results are documented in system assessment reports. Based on the deficiencies identified in the tank farm system assessment reports, and additional requirements analysis performed in support of the River Protection Project (RPP), an approved scope for the TFRSO effort was developed and documented in the Upgrade Scope Summary Report (USSR), WHC-SD-W314-RPT-003, Rev. 4. The USSR establishes the need for the upgrades and identifies the specific equipment to be addressed by this project. This Project Design Concept (PDC) is in support of the Phase 2 upgrades and provides an overall description of the operations concept for the W-314 Primary Ventilation Systems. Actual specifications, test requirements, and procedures are not included in this PDC. The PDC is a ''living'' document, which will be updated throughout the design development process to provide a progressively more detailed description of the W-314 Primary Ventilation Systems design. The Phase 2 upgrades to the Primary Ventilation Systems shall ensure that the applicable current requirements are met for: Regulatory Compliance; Safety; Mission Requirements; Reliability; and Operational Requirements

  12. Project Management in Instructional Design: ADDIE Is Not Enough

    Science.gov (United States)

    Van Rooij, Shahron Williams

    2010-01-01

    In the digital age, instructional designers must possess both a sound instructional design knowledge base and solid project management skills that will enable them to complete courseware projects on time, on budget and in conformance with client expectations. Project management skills include the ability to apply repeatable processes, along with…

  13. The Use of Volunteers in Local Study Library Projects: A Case Study of the Walter Gardiner Photography Project

    Directory of Open Access Journals (Sweden)

    Beth Hewitt

    2012-03-01

    Full Text Available Objectives – Interviews with library staff and volunteers were conducted to evaluate the use of volunteers in UK public libraries via a case study of the Walter Gardiner Photographic Project, a digitisation project based in Worthing Library, to inform future guidelines on volunteer usage and to make recommendations to existing practice.Methods – Fourteen semi-structured interviews were carried out to explore the perceptions and experiences of both staff and volunteers of the project. All interviews were fully transcribed and then coded to identify emergent themes.Results – Key positives for volunteers were professional training, good time management and organization by staff, the friendliness and approachability of staff, and the informal nature of the volunteering. Enjoyment of the work and forming close relationships with others were key motivating factors. For staff, the completion of work which would have otherwise been impossible was the most positive outcome. Problem areas identified by volunteers were lack of contact time with project staff and feeling isolated from other library staff. For project staff, a lack of professionalism on behalf of some volunteers was the primary negative. Key issues to emerge were the need to strike a balance between formal and informal management, the need for good integration between the volunteers and host organization, and the importance of acknowledging the nature of the voluntary commitment.Conclusions – The project proved overall to be a successful example of using volunteers in public library projects with good examples of volunteer recruitment, training, and management being demonstrated. Areas of conflict that did arise stemmed from differing expectations of levels of service between staff and volunteers. Clarification on these expectations through a written volunteer agreement is advocated for further projects.

  14. Asian-American Communications: In-School Staff Workshops, 1991-92. Final Evaluation Report. OREA Report.

    Science.gov (United States)

    Zhang, Zenin

    The In-School Staff Workshops project run by Asian-American Communications was evaluated in its fourth year. The project provided various workshops for staff on Asian American and Asian cultures, intercultural communications, and strategies for helping Asian American students adjust to their new social and educational environments. The project…

  15. NKA/KRU project on operator training, control room designing and human reliability. Summary report

    International Nuclear Information System (INIS)

    1981-06-01

    A Nordic integrated project on human reliability in the conditions of new advanced technology seeks to establish: - The actual repertoire of activities and tasks performed by the operating staff of a nuclear power plant and its dependence on the present and future levels of automation. - The knowledge required for these activities and appropriate means for training plant operators and for competence evaluation and retraining in coping with the rare events. - Models of human operator performance; how do operators read information and make decisions under normal and abnormal plant conditions and how does their performance depend upon control room design. - The typical limits of human capabilities and mechanisms of human errors as they are represented in existing records of incidents and accidents in industrial plants. - The use of process computers for improved design of data presentation and operator support systems, especially for disturbance analysis and diagnosis during infrequent plant disturbance. - Development of experimental techniques to validate research results and proposals for improved man/machine interfaces and other computer-based support systems. (EG)

  16. Design project management mode as the introduction

    International Nuclear Information System (INIS)

    Zhang Xiaoping

    2014-01-01

    This article consider nuclear power plant's current design schedule management mode as the introduction, analysis of current management in-depth, summed up the advantage and disadvantage of the existing management mode. It makes use of mature closed loop cycle project management, and submits progress tracking model assumptions. It also introduces the purpose and background of the progress automation model, the theoretical assumptions of the model, the design criteria and evaluation system of indicators of progress. Based on the achievement process model, this article mainly discusses the specific processes and key points of the project closed loop cycle, and the improvement of the process of project management. (author)

  17. Study protocol for the translating research in elder care (TREC: building context – an organizational monitoring program in long-term care project (project one

    Directory of Open Access Journals (Sweden)

    Cummings Greta G

    2009-08-01

    Full Text Available Abstract Background While there is a growing awareness of the importance of organizational context (or the work environment/setting to successful knowledge translation, and successful knowledge translation to better patient, provider (staff, and system outcomes, little empirical evidence supports these assumptions. Further, little is known about the factors that enhance knowledge translation and better outcomes in residential long-term care facilities, where care has been shown to be suboptimal. The project described in this protocol is one of the two main projects of the larger five-year Translating Research in Elder Care (TREC program. Aims The purpose of this project is to establish the magnitude of the effect of organizational context on knowledge translation, and subsequently on resident, staff (unregulated, regulated, and managerial and system outcomes in long-term care facilities in the three Canadian Prairie Provinces (Alberta, Saskatchewan, Manitoba. Methods/Design This study protocol describes the details of a multi-level – including provinces, regions, facilities, units within facilities, and individuals who receive care (residents or work (staff in facilities – and longitudinal (five-year research project. A stratified random sample of 36 residential long-term care facilities (30 urban and 6 rural from the Canadian Prairie Provinces will comprise the sample. Caregivers and care managers within these facilities will be asked to complete the TREC survey – a suite of survey instruments designed to assess organizational context and related factors hypothesized to be important to successful knowledge translation and to achieving better resident, staff, and system outcomes. Facility and unit level data will be collected using standardized data collection forms, and resident outcomes using the Resident Assessment Instrument-Minimum Data Set version 2.0 instrument. A variety of analytic techniques will be employed including descriptive

  18. Project HealthDesign: enhancing action through information.

    Science.gov (United States)

    Brennan, Patricia Flatley; Casper, Gail; Downs, Stephen; Aulahk, Veenu

    2009-01-01

    Project HealthDesign is a country-wide initiative in the United States designed to stimulate innovation in personal health records (PHRs). Nine grantee teams engaged in an 18-month long design and prototyping process. Two teams addressed the needs of children and adolescents; three created novel approaches to help adults prevent or manage metabolic syndrome; three groups employed interface innovations to assist patients with chronic care management and one team devised a novel calendaring system to assist patients undergoing complex medical/surgical treatments to integrate care processes into their daily lives. These projects not only included development and testing of novel personal health records applications, but also served as the starting point to specify and implement a common technical core platform. The project advanced PHR development in two key ways: intensive user-centered design and a development architecture that separates applications of PHRs from the infrastructure that supports them. The initiative also allowed systematic investigation of significant ethical, legal and social issues, including how privacy considerations are changed when information technology innovations are used in the home and the rebalancing of the authority structure of health care decision making when patient-centered approaches guide the design of PHRs.

  19. Development of a Refined Staff Group Trainer

    National Research Council Canada - National Science Library

    Quensel, Susan

    1999-01-01

    .... As a follow-on effort to the previous SGT project, the goal was to refine a brigade-level staff training program to more effectively and efficiently coordinate the activities within and between the...

  20. A Symbiosis between Instructional Systems Design and Project Management

    Science.gov (United States)

    Pan, Cheng-Chang

    2012-01-01

    This study is intended to explore a complementary relationship between instructional systems design (ISD) and project management in an attempt to build a plausible case for integrating project management as a distinct course in the core of the graduate instructional systems design programs. It is argued that ISD and project management should form…

  1. Project X: Accelerator Reference Design

    Energy Technology Data Exchange (ETDEWEB)

    Holmes, Stephen D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)

    2013-06-20

    Project X is a high-intensity proton facility being developed to support a world-leading program of Intensity Frontier physics over the next two decades at Fermilab. Project X is an integral part of the U.S. Intensity Frontier Roadmap as described in the P5 report of May 2008 [1] and within the Fermilab Strategic Plan of November 2011 [2]. This document represents Part I of the “Project X Book” describing the Project X accelerator facility and the broad range of physics research opportunities enabled by Project X. Parts II and III provide in-depth descriptions of the physics research program, both within and beyond particle physics [3]. The primary elements of the U.S. program to be supported by Project X include: Neutrino Experiments: Experimental studies of neutrino oscillations and neutrino interaction physics with ultra-intense neutrino beams provided by a high-power proton source with energies up to 120 GeV, utilizing near detectors at the Fermilab site and massive detectors at distant underground laboratories. Goal: At least 2 MW of proton beam power at any energy between 60 to 120 GeV; several hundred kW of proton beam power on target at 8 GeV. Kaon, Muon, Nucleon, and Neutron Precision Experiments: World-leading experiments studying ultra-rare kaon decays, searching for muon-to-electron conversion and nuclear electron dipole moments (EDMs), and exploring neutron properties at very high precision. Goal: MW-class proton beams supporting multiple experiments at 1 and 3 GeV, with flexible capability for providing distinct beam formats to concurrent users while allowing simultaneous operations with the neutrino program. Material Science and Nuclear Energy Applications: High-intensity accelerator, spallation, target and transmutation technology demonstrations will provide critical input into the design of future energy systems, including next generation fission reactors, nuclear waste transmutation systems and future thorium fuel-cycle power systems. Possible

  2. Investigation of the Relationship between Green Design and Project Delivery Methods

    Energy Technology Data Exchange (ETDEWEB)

    Bilec, Melissa M.; Ries, Robert J.

    2008-04-24

    The selection of the project delivery method (PDM) for any project is critical--it establishes communication, coordination, and contractual issues between the owner, contractor, and designer. With an increase in the number of green design projects, understanding the relationship between the PDM and green design is paramount to project and contract management. It is reasonable to assume that a positive relationship between green design and design-build (DB) exists since both theoretically are intended to foster an integrated, holistic, and collaborative project. This research examines the relationship between the design-bid-build (DBB), construction management (CM), and DB PDMs and green design with the goal of establishing best practices and identifying potential synergies between them. The research collected information by conducting primarily telephone interviews with approximately twenty-five individuals, including owners, contractors, and designers involved in completed green design projects, mainly in the public sector. The interviews developed a general understanding of the current state of knowledge and experience and not a rigorous quantitative analysis. Upon completion of the interviews, the tabulated results were summarized and green project characteristics and project-PDM interactions emerged. Existing published research was evaluated to reveal aspects of PDMs independent of green design. Best practices were ascertained by combining information from the interviews and published research. Best practices are as follows: (1) Project implementation features--The decision to use DB as PDM on green design or other projects should be based on the specific project features; e.g., well-defined scope and adequate owner staffing. DB will not produce successful results on all projects. (2) Collaboration--Project team collaboration early in the design and construction process is an important aspect of green projects, and collaboration was considered somewhat more

  3. Core designs of modern VVER projects

    International Nuclear Information System (INIS)

    Vasilchenko, I.; Kushmanov, S.; Vjalitsyn, V.; Vasilchenko, R.

    2015-01-01

    The presented operational experience of TVS - 2M (pilot-commercial operation started in 2006 at Balakovo NPP -1) enables to use it as reference for new projects because of similarity in designs and operational conditions. In the paper main parameters of fuel cycles, stability to impact of damaging factors, pilot operation of MG, new alloys, ADF and NTMC, upgrade of FA - 2M for the further power uprating, profiling of Gd-fuel rods for 18-month Fuel Cycle (FC) and perfection of absorber element design are the discussed issues. At the end author concluded that: 1) Core designs of new projects AES-2006 and VVER-TOI are based on extensive successful operational experience of the close prototype of TVS - 2M. 2) All improvements both of technical and economic parameters of fuel are subjected to representative examination by pilot operation at the power units with VVER-1000 being close prototypes of new designs

  4. Danish investors' demands on skills and attributes of local accounting staff, are they met? - the case of Estonia

    DEFF Research Database (Denmark)

    Sundgaard, Elin; Thomsen, Jeanette; Alver, Lehte

    2008-01-01

    gaps by examining in depth a specific practice, i.e. the accounting staff of the Danish affiliations in Estonia.  Research on accounting staff is almost non-existing. This paper gives the project description and the research design as well as the results of a pilot interview in a big Danish...... and surprising aspects, e.g. the different roles and skills expectations to accountants and controllers.  These aspects will be considered when interviewing the bulk of Danish-owned Estonian companies to have their answers to the problems. The interviews will be conducted during spring 2009....

  5. Public Library Staff as Community Health Partners: Training Program Design and Evaluation.

    Science.gov (United States)

    Morgan, Anna U; D'Alonzo, Bernadette A; Dupuis, Roxanne; Whiteman, Eliza D; Kallem, Stacey; McClintock, Autumn; Fein, Joel A; Klusaritz, Heather; Cannuscio, Carolyn C

    2018-05-01

    Public libraries are free and open to all-and accessed at high rates by vulnerable populations-which positions them to be key public health allies. However, library staff themselves often feel ill-equipped to address the health and social concerns of their patrons. To fill this gap, we developed a case-based training curriculum to help library staff recognize, engage, and refer vulnerable patrons to appropriate resources. Topics addressed in the training, including homelessness, mental health and substance use disorders, immigration, and trauma, were selected based on findings from a prior community needs assessment. Using a modified measure of self-efficacy, participants ( n = 33) were surveyed before and after each session. Several participants ( n = 7) were also interviewed 4 months after the training was completed. Overall, staff reported significant increases in comfort, confidence, and preparedness in assisting vulnerable patrons across all topic areas. Qualitative findings reflected positive perceived impact and value of the trainings. Staff felt training resources should be made more readily accessible. Improving library staff capacity to address the health and social needs of their patrons can further establish public libraries as partners in improving population health.

  6. Design management of general contractor under nuclear power project EPC mode

    International Nuclear Information System (INIS)

    Su Shaojian

    2013-01-01

    Design management has not yet formed a theoretical system recognized, general contractor design managers under nuclear power project EPC Mode lack the clear theory basis. This paper aims to discuss Design management from the angle of general contractor under nuclear power project EPC mode, Gives the concept of design management Clearly, by Combining the characteristics of nuclear power project, Gives the specific content and meaning of the design management of nuclear power project. (authors)

  7. An evaluation of staff engagement programmes in four National Health Service Acute Trusts.

    Science.gov (United States)

    Hewison, Alistair; Gale, Nicola; Yeats, Rowena; Shapiro, Jonathan

    2013-01-01

    The purpose of this paper is to report the findings from an evaluation project conducted to investigate the impact of two staff engagement programmes introduced to four National Health Service (NHS) hospital Trusts in England. It seeks to examine this development in the context of current policy initiatives aimed at increasing the level of staff involvement in decision-making, and the related literature. A mixed-methods approach incorporating document analysis, interviews, a survey and appreciative inquiry, informed by the principles of impact evaluation design, was used. The main finding to emerge was that leadership was crucial if widespread staff engagement was to be achieved. Indeed, in some of the trusts the staff engagement programmes were seen as mechanisms for developing leadership capability. The programmes had greater impact when they were "championed" by the Chief Executive. Effective communication throughout the organisations was reported to be a prerequisite for staff engagement. Problems were identified at the level of middle management where the lack of confidence in engaging with staff was a barrier to implementation. The nature of the particular organisational context is crucial to the success of efforts to increase levels of staff engagement. The measures that were found to work in the trusts would need to be adapted and applied to best meet the needs of other organisations. Many health care organisations in England will need to harness the efforts of their workforce if they are to meet the significant challenges of dealing with financial restraint and increasing patient demand. This paper provides some insights on how this can be done.

  8. Staff Development Redesigned.

    Science.gov (United States)

    Lambert, Linda

    1988-01-01

    Contends that staff development, supposedly designed to assist teachers, has instead colluded with forces to continue their colonization. Since teachers are not taking charge of their profession and participating actively in educational change, certain actions must be taken to lighten their nonprofessional workload and to build a professional…

  9. Piecing the Puzzle: A Framework for Developing Intercultural Online Communication Projects in Business Education

    Science.gov (United States)

    Crossman, Joanna; Bordia, Sarbari

    2012-01-01

    Purpose: The purpose of this paper is to present a framework based on lessons learnt from a recently completed project aimed at developing intercultural online communication competencies in business students. Design/methodology/approach: The project entailed collaboration between students and staff in business communication courses from an…

  10. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  11. Design and initial implementation of the WHO FP umbrella project- to strengthen contraceptive services in the sub Saharan Africa.

    Science.gov (United States)

    Kabra, Rita; Ali, Moazzam; Kiarie, James

    2017-06-15

    Strengthening contraceptive services in sub Saharan Africa is critical to achieve the FP 2020 goal of enabling 120 million more women and girls to access and use contraceptives by 2020 and the Sustainable Development Goals (SDG) targets of universal access to sexual and reproductive health (SRH) services including family planning by 2030. The World Health Organization (WHO) and partners have designed a multifaceted project to strengthen health systems to reduce the unmet need of contraceptive and family planning services in sub Saharan Africa. The plan leverages global, regional and national partnerships to facilitate and increase the use of evidence based WHO guidelines with a specific focus on postpartum family planning. The four key approaches undertaken are i) making WHO Guidelines adaptable & appropriate for country use ii) building capacity of WHO regional/country staff iii) providing technical support to countries and iv) strengthening partnerships for introduction and implementation of WHO guidelines. This paper describes the project design and elaborates the multifaceted approaches required in initial implementation to strengthen contraceptive services. The initial results from this project reflect that simultaneous application these approaches may strengthen contraceptive services in Sub Saharan Africa and ensure sustainability of the efforts. The lessons learned may be used to scale up and expand services in other countries.

  12. The contribution of nuclear training staff to human factors work in the CEGB and Nuclear Electric PLC

    International Nuclear Information System (INIS)

    Madden, V.J.

    1990-01-01

    The staff and simulators of utility's nuclear training function are being utilized in support of a wide range of human factor related activities. In addition to work on man machines interface review, operating procedures, operator support system and VDU format design and validation for the Magnox and AGR series of nuclear power plants, support is also being provided to the PWR Project Team through staff who have undergone extensive and comprehensive overseas PWR training programs. This paper discusses how recent initiatives in connection with a survey on operator stress and the possible use of psychometric testing in support of the selection of reactor desk engineers are also being supported

  13. Academic Staff's Views About International Scholarships and Support Programs

    Directory of Open Access Journals (Sweden)

    M. Ertaç ATİLA

    2015-04-01

    Full Text Available The aim of this study is to determine views of academic staff who have been to the United States in order to do a research study by means of scholarships and support programs provided by the Higher Education Council or Scientific or Technological Research Council of Turkey about the scholarship programs. The qualitative study is carried out as a holistic multiple case study research design. The data were gathered through semi-structured interviews from 10 academic staff who participated the scholarship program. Data were analyzed with content analysis technique. The results indicated that application process, time and financial resources were important for the preferences of academic staff in scholarship and support programs. The main reasons for applying the scholar program to undertake an international research study are grouped under three headings as academic, socio-cultural and foreign language improvements. The main influencing factors behind the researchers' preferences to go the United States are its' level of advancements in scientific research and peer influence. Concerning the duration of a research study in abroad the participants thought that 6 months to one year is adequate time and this time depends on the foreign language skills of the researchers, the field of study, subject and project. The main drawbacks of an international research study visit are the long waiting times for having the United States visa with no adequate support, the cost of health insurance and visa, lack of speaking foreign language skills, and adaptation time in the first arrival. As a result, the experienced participants suggested that the future scholarships have to cover health insurance; the researchers have to be supported for developing their foreign language skills and develop a clear research agenda and project prior to going abroad.

  14. JOB CENTRE FOR DOMESTIC STAFF IN SWITZERLAND

    CERN Multimedia

    Relations with the Host States Service; http://www.cern.ch/relations/

    2001-01-01

    The Permanent mission of Switzerland to the International Organisations in Geneva has informed CERN that the Geneva Welcome Centre has set up an employment registration desk for the domestic staff of international civil servants. The aim of this pilot project is, on the one hand, to help international civil servants find domestic staff and, on the other hand, to help domestic staff holding an 'F'-type carte de légitimation find employment within 30 days after the expiry of a contract. For more information, please contact the Geneva Welcome Centre, La Pastorale, 106, route de Ferney, Case postale 103, 1211 Genève 20, tel. (+41.22) 918 02 70, fax (+41.22) 918 02 79), http://geneva-international.org/Welcome.E.html.

  15. Student design projects in applied acoustics.

    Science.gov (United States)

    Bös, Joachim; Moritz, Karsten; Skowronek, Adam; Thyes, Christian; Tschesche, Johannes; Hanselka, Holger

    2012-03-01

    This paper describes a series of student projects which are intended to complement theoretical education in acoustics and engineering noise control with practical experience. The projects are also intended to enhance the students' ability to work in a team, to manage a project, and to present their results. The projects are carried out in close cooperation with industrial partners so that the students can get a taste of the professional life of noise control engineers. The organization of such a project, its execution, and some of the results from the most recent student project are presented as a demonstrative example. This latest project involved the creation of noise maps of a production hall, the acoustic analysis of a packaging machine, and the acoustic analysis of a spiral vibratory conveyor. Upon completion of the analysis, students then designed, applied, and verified some simple preliminary noise reduction measures to demonstrate the potential of these techniques. © 2012 Acoustical Society of America

  16. Gaming: a creative strategy for staff education.

    Science.gov (United States)

    Swartzendruber, D

    1994-02-01

    Providing staff development in a stimulating, innovative manner is the challenge of all nurse educators. This article discusses gaming, a creative teaching strategy that can help meet these needs. Games designed specifically for the education of dialysis staff will be reviewed. Advantages of the various games will also be examined.

  17. Factors associated with staff development processes and the creation of innovative science courses in higher education

    Science.gov (United States)

    Hodges, Jeanelle Bland

    1999-11-01

    The purpose of the study was to determine factors associated with staff development processes and the creation of innovative science courses by higher education faculty who have participated in a model staff development project. The staff development program was designed for college faculty interested in creating interdisciplinary, constructivist-based science, mathematics, or engineering courses designed for non-majors. The program includes workshops on incorporating constructivist pedagogy, alternative assessment, and technology into interdisciplinary courses. Staff development interventions used in the program include grant opportunities, distribution of resource materials, and peer mentoring. University teams attending the workshops are comprised of faculty from the sciences, mathematics, or engineering, as well as education, and administration. A purposeful and convenient sample of three university teams were subjects for this qualitative study. Each team had attended a NASA Opportunities for Visionary Academics (NOVA) workshop, received funding for course development, and offered innovative courses. Five questions were addressed in this study: (a) What methods were used by faculty teams in planning the courses? (b) What changes occurred in existing science courses? (c) What factors affected the team collaboration process? (d) What personal characteristics of faculty members were important in successful course development? and (e) What barriers existed for faculty in the course development process? Data was collected at each site through individual faculty interviews (N = 11), student focus group interviews (N = 15), and classroom observations. Secondary data included original funding proposals. The NOVA staff development model incorporated effective K--12 interventions with higher education interventions. Analysis of data revealed that there were four factors of staff development processes that were most beneficial. First, the team collaborative processes

  18. FACTORS AFFECTING EFFICIENT CONSTRUCTION PROJECT DESIGN DEVELOPMENT: A PERSPECTIVE FROM INDIA

    Directory of Open Access Journals (Sweden)

    Devanshu Pandit

    2015-12-01

    Full Text Available Internationally projects exhibit time and cost overrun. It is observed that problems during design development contribute significantly to delays. In India, projects undertaken by government were largely planned and designed by departmental planners and engineers. However, after globalization, projects have increased in number resulting in design outsourcing, but with attendant challenges. The paper is aimed at identifying and analysing factors in the design development phase that can have impact on project success. 30 factors related to design development were identified through two separate brainstorming sessions. A questionnaire was then administered to determine importance ranking of these factors. Relative importance index (RII was used to prioritise these factors. Top ten factors in design development identified using RII include structural design parameters, soil investigations, design quality control, topographic survey, and architectural design parameters. The results can help firms improve their design development practices by prioritising activities that could have more impact on project performance.

  19. Staff size evolution at the Spanish nuclear power plants

    International Nuclear Information System (INIS)

    Ibanez, M.

    2001-01-01

    This paper describes the main characteristics on the Spanish nuclear electricity sector with an installed capacity of 7580 MW from three different generations, commissioned between 1968 and 1988 and with good plant performance. The analysis of the operation and maintenance cost contributors, made in this paper, shows that the cost of the personnel (own staff plus permanent contractors) amount to around the 80% of the total O and M cost. The paper will describe the evolution of the staff size for all the Spanish NPPs during the last years. In more detail the experience of Garona NPP, a single unit BWR 460 MW(e) commissioned in 1971, and Trillo NPP, a single unit PWR 1066 MW(e) commissioned in 1988, will be presented with the evolution of the following parameters: number of utility employees, number of permanent contractors, O and M costs versus kWh produced. The evolution of the staffing size is correlated with internal organization improvements, managerial policies, regulatory requirements, emergent activities, future projects, etc. The paper will include future reactors considerations that will operate in a competitive environment with other sources of energy and with a high level of safety standards. The strong influence of the personnel in the O and M cost will mean that actions related to reduce or optimize the plant staff will be based on design, organizational and regulatory considerations. (author)

  20. The effectiveness of staff training focused on increasing emotional intelligence and improving interaction between support staff and clients.

    Science.gov (United States)

    Zijlmans, L J M; Embregts, P J C M; Gerits, L; Bosman, A M T; Derksen, J J L

    2015-07-01

    Recent research addressed the relationship between staff behaviour and challenging behaviour of individuals with an intellectual disability (ID). Consequently, research on interventions aimed at staff is warranted. The present study focused on the effectiveness of a staff training aimed at emotional intelligence and interactions between staff and clients. The effects of the training on emotional intelligence, coping style and emotions of support staff were investigated. Participants were 214 support staff working within residential settings for individuals with ID and challenging behaviour. The experimental group consisted of 76 staff members, 138 staff members participated in two different control groups. A pre-test, post-test, follow-up control group design was used. Effectiveness was assessed using questionnaires addressing emotional intelligence, coping and emotions. Emotional intelligence of the experimental group changed significantly more than that of the two control groups. The experimental group showed an increase in task-oriented coping, whereas one control group did not. The results with regard to emotions were mixed. Follow-up data revealed that effects within the experimental group were still present four months after the training ended. A staff training aimed at emotional intelligence and staff-client interactions is effective in improving emotional intelligence and coping styles of support staff. However, the need for more research aiming at the relationship between staff characteristics, organisational factors and their mediating role in the effectiveness of staff training is emphasised. © 2014 MENCAP and International Association of the Scientific Study of Intellectual and Developmental Disabilities and John Wiley & Sons Ltd.

  1. SERI Solar Radiation Resource Assessment Project: Fiscal Year 1990 Annual Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Riordan, C; Maxwell, E; Stoffel, T; Rymes, M; Wilcox, S

    1991-07-01

    The purpose of the Solar Radiation Resource Project is to help meet the needs of the public, government, industry, and utilities for solar radiation data, models, and assessments as required to develop, design, deploy, and operate solar energy conversion systems. The project scientists produce information on the spatial (geographic), temporal (hourly, daily, and seasonal), and spectral (wavelength distribution) variability of solar radiation at different locations in the United States. Resources committed to the project in FY 1990 supported about four staff members, including part-time administrative support. With these resources, the staff must concentrate on solar radiation resource assessment in the United States; funds do not allow for significant efforts to respond to a common need for improved worldwide data. 34 refs., 21 figs., 6 tabs.

  2. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  3. The Design and Development of Staff Wellbeing Initiatives: Staff Stressors, Burnout and Emotional Exhaustion at Children and Young People's Mental Health in Australia.

    Science.gov (United States)

    Coates, Dominiek D; Howe, Deborah

    2015-11-01

    Mental health work presents problems for staff over and above those encountered in other organisations, including other areas of healthcare. Healthcare workers, in particular mental health workers, have poorer job satisfaction and higher job burnout and turnover compared with established norms for other occupational groups. To make sense of why healthcare workers experience high levels of burnout, a strong body of literature points to the emotionally demanding nature of people-work. The negative effects of mental health work on employee health can be mitigated by the provision of appropriate job resources and wellbeing initiatives. As to develop initiatives that appropriately target staff sources of stress and needs, it is important to engage staff in this process. As such, Children and Young People's Mental Health (CYPMH) and headspace Gosford, in Australia, New South Wales (NSW), developed a survey to identify how staff experience and manage the emotional demands of mental health work, what they identify as key stressors and which initiatives they would like to see implemented. Fifty-five staff (response rate of 73 %) completed the survey, and the results suggest that while staff find the work emotionally demanding, they do not appear to be emotionally exhausted and report administrative rather than client issues as their primary concerns. While a strong body of literature identifies the management of emotions in the workplace as a significant cause of stress, organisational stressors such as working in a bureaucratic environment are also important to understanding staff wellbeing.

  4. Exploratory Shaft, Phase 1, Project B-314: Title 1 design report system design description

    International Nuclear Information System (INIS)

    Hanlen, D.F.

    1983-01-01

    The report describes the project and the project systems, the principal design bases, and principal hazards and project interfaces. This report also contains the Title 1 Estimate Summary. 5 figs., 8 tabs

  5. A projective approach to a language of landscape design

    Directory of Open Access Journals (Sweden)

    Catherine Ward Thompson

    1997-10-01

    Full Text Available Building on the work of Kelly (1955 in personal construct psychology, and Peled (1976, I990 in ecoanalysis, this paper develops projective techniques-which use concepts of personal and phenomenological space-as a means for articulating approaches to landscape design. The projective approach involves two stages. In stage one, projective techniques are used to elicit personal constructs (which may be held at a pre-conscious or sub-conscious level, allowing the holistic experience of landscape to be explored. In stage two, using a 'projection location task' derived from the way we experience and construe the regions of our own bodies, elements of these constructs can then be articulated so as to inform the way we interact and engage with the space around us. This gives insight into the meaning of spatial layouts, which can then be translated into a design language for the structural ordering of space. The author draws on original research conducted with children as well as adults, using projective techniques to draw out their desires and needs in relation to designing their landscape environment. The paper discusses the value of such methods for landscape designers and their clients, and outlines some ongoing research to test the validity of the projection location task.

  6. Perceptions of staff at Eastern Cape Technikon on the value and ...

    African Journals Online (AJOL)

    This study was performed to determine the perceptions of staff at Eastern Cape Technikon on the value and effectiveness of linkage partnerships. Academic staff indicated that the main reason for their involvement in these projects is capacity building. Apart from the development of skills and competencies they also rate ...

  7. A process model for design team communication within fast-track building projects using project websites

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Reymen, I.M.M.J.

    2008-01-01

    The factor time within building projects is on high pressure because of the increasing need for faster delivery of buildings. Within fast track, complex building projects the design process is an important key. Through case analyses offart-hack design processes it became obvious that process and

  8. Tying the Design of Your Camp Staff Training to the Delivery of Desired Youth Outcomes

    Science.gov (United States)

    Galloway, Robin; Bourdeau, Virginia; Arnold, Mary; Nott, Brooke D.

    2013-01-01

    As experience camp directors, we've seen the challenges faced by young camp counselors and inexperienced staff. Evaluations from staff at many camps motivated us to help our people be more effective with their campers. In response we created a comprehensive camp staff training. Lessons showed staff what we wanted them to do and say as they…

  9. Elections for staff representatives – Join, commit and vote!

    CERN Multimedia

    Staff Association

    2015-01-01

    The Staff Council is a statutory body representing collectively in the area of employment conditions all CERN staff members (MPE and MPA), as well as the pensioners, former Cernois. The Staff Council is the supreme representative body of the CERN staff and pensioners, which defines the main lines of the policy of the Staff Association. The Staff Council is composed of staff representatives (45 seats to represent staff members, and 5 for representing fellows and associate members), as well as delegates for pensioners (seven positions), designated by GAC-EPA. Every two years, the Council is renewed through elections. Concerning the 45 delegates representing staff members, all departments have a least two seats allocated, one in career paths AA to D and one in career paths E to H. This guarantees a fair distribution of seats among the various organizational units and career paths. The table below, shows the exact number of delegates per department and career paths. Staff members or fellows who want to participa...

  10. Staff/population ratios in South African public sector mental health ...

    African Journals Online (AJOL)

    To document existing staff/population ratios per 100 000 population in South African public sector mental health services. Design. Cross-sectional survey. ... The staff/population ratios per 100 000 population for selected personnel categories (with the interprovincial ranges in brackets) were as follows: total nursing staff 15.6 ...

  11. Southeast Region Headboat Survey-PPS Survey Design Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This dataset is a record of trips selected during pilot procedures for the PPS design project designed to track the port agents ability to follow the PPS design and...

  12. Implementing differentiated practice: personal values and work satisfaction among hospital staff nurses.

    Science.gov (United States)

    Prothero, M M; Marshall, E S; Fosbinder, D M

    1999-01-01

    This project was part of a collaborative model for nursing staff development and student education. Personal values and work satisfaction of 49 staff nurses working on three hospital units were compared. One of the units employed differentiated practice. Results revealed high similarity in personal values among all nurses. Work satisfaction was significantly higher among nurses working on the unit employing differentiated practice. The importance of assessing personal values of nurses emerged as an important aspect of staff development, and differentiated practice appeared to be related to staff nurse satisfaction.

  13. Systems approach for design control at Monitored Retrievable Storage Project

    International Nuclear Information System (INIS)

    Kumar, P.N.; Williams, J.R.

    1994-01-01

    This paper describes the systems approach in establishing design control for the Monitored Retrievable Storage Project design development. Key elements in design control are enumerated and systems engineering aspects are detailed. Application of lessons learned from the Yucca Mountain Project experience is addressed. An integrated approach combining quality assurance and systems engineering requirements is suggested to practice effective design control

  14. Engaging pediatric intensive care unit (PICU) clinical staff to lead practice improvement: the PICU participatory action research project (PICU-PAR).

    Science.gov (United States)

    Collet, Jean-Paul; Skippen, Peter W; Mosavianpour, Mir Kaber; Pitfield, Alexander; Chakraborty, Bubli; Hunte, Garth; Lindstrom, Ronald; Kissoon, Niranjan; McKellin, William H

    2014-01-08

    Despite considerable efforts, engaging staff to lead quality improvement activities in practice settings is a persistent challenge. At British Columbia Children's Hospital (BCCH), the pediatric intensive care unit (PICU) undertook a new phase of quality improvement actions based on the Community of Practice (CoP) model with Participatory Action Research (PAR). This approach aims to mobilize the PICU 'community' as a whole with a focus on practice; namely, to create a 'community of practice' to support reflection, learning, and innovation in everyday work. An iterative two-stage PAR process using mixed methods has been developed among the PICU CoP to describe the environment (stage 1) and implement specific interventions (stage 2). Stage 1 is ethnographic description of the unit's care practice. Surveys, interviews, focus groups, and direct observations describe the clinical staff's experiences and perspectives around bedside care and quality endeavors in the PICU. Contrasts and comparisons across participants, time and activities help understanding the PICU culture and experience. Stage 2 is a succession of PAR spirals, using results from phase 1 to set up specific interventions aimed at building the staff's capability to conduct QI projects while acquiring appropriate technical skills and leadership capacity (primary outcome). Team communication, information, and interaction will be enhanced through a knowledge exchange (KE) and a wireless network of iPADs. Lack of leadership at the staff level in order to improve daily practice is a recognized challenge that faces many hospitals. We believe that the PAR approach within a highly motivated CoP is a sound method to create the social dynamic and cultural context within which clinical teams can grow, reflect, innovate and feel proud to better serve patients.

  15. Hygiene Knowledge of Food Staff in Catering Industry

    OpenAIRE

    Hülya Yardımcı; Gülperi Hakli; Funda Pinar Çakiroğlu; Ayşe Özfer Özçelik

    2015-01-01

    This study, designed as a cross-sectional study, was carried out to determine the hygiene knowledge of the staff (N = 317) employed in kitchen and service departments of catering firms in Ankara. It was found that the mean scores of the staff with regard to personal hygiene, food hygiene, and kitchen and equipment hygiene were 10.7 ± 1.6, 19.8 ± 4.0, and 13.6 ± 2.0, respectively. Male staff achieved higher mean scores ...

  16. Knowledge Creation Through Development Projects

    DEFF Research Database (Denmark)

    Laursen, Erik

    2010-01-01

    The focus of the paper is set on efforts to produce and manage organizational learning and development through engagement in organizational development projects, involving the implementation of new methods, new technologies and new ways of organizing the work processes. The issues discussed...... study of four organizational development projects (covering the organizations as a whole) held by four Danish High Schools (“gymnasium”). The study included questionnaires as well as interviews with the management and staff, plus a survey of selected written materials and documents. The purpose...... of the paper is to describe the activities, actually organized by the projects., as well as the various ways in which different groupings among the staff and the management are relating to the project. A special focus is set on the different perspectives on the projects established by the staff...

  17. Knowledge management in design teams using a project website

    OpenAIRE

    Otter, den, A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for sharing of knowledge in such teams are hard to change and better systems are difficult to implement for various reasons. Sharing of knowledge in such teams is important for collective understanding of ...

  18. A Staff Development Program Designed To Reach the Partnership School's Goals: Cooperative Learning Strategies, Coaching Sessions and a Narrowed Academic Performance Gap among Student Populations.

    Science.gov (United States)

    Cook, Kathy; Karr-Kidwell, PJ

    This paper describes the design and implementation of a staff-development program at Vivian Field Junior High School in Carrollton, Texas. The school is a member of the Texas Partnership School Initiative, which was created to give schools latitude in raising student achievement. The goal of the staff-development program was to identify gains in…

  19. Hygiene Knowledge of Food Staff in Catering Industry

    Directory of Open Access Journals (Sweden)

    Hülya Yardımcı

    2015-04-01

    Full Text Available This study, designed as a cross-sectional study, was carried out to determine the hygiene knowledge of the staff (N = 317 employed in kitchen and service departments of catering firms in Ankara. It was found that the mean scores of the staff with regard to personal hygiene, food hygiene, and kitchen and equipment hygiene were 10.7 ± 1.6, 19.8 ± 4.0, and 13.6 ± 2.0, respectively. Male staff achieved higher mean scores in personal hygiene knowledge test compared with female staff (p < .01. The staff receiving a hygiene training were determined to have higher mean scores in terms of hygiene knowledge tests compared with those who have not received, and the production staff had higher knowledge as to hygiene than the other groups (p < .01. The mean scores for hygiene knowledge tests were found to be increasing with age. Hygiene knowledge scores of the staff were quite lower than what must be taken. For that reason, periodical training programs should be organized to increase the awareness of the staff about hygiene.

  20. Project designing of Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Krychtalek, Z.; Linek, V.

    1989-01-01

    The geological and seismic parameters are listed of the Temelin nuclear power plant. The division of the site in building zones is described. The main zones consist of the power generation unit zone with the related auxiliary buildings of hot plants and of the auxiliary buildings of the nonactive part with industrial buildings. The important buildings are interconnected with communication and technology bridges. Cooling towers and spray pools and the entrance area are part of the urbanistic design. The architectonic design of the buildings uses standard building elements and materials. The design of the buildings is based on the requirements on their function and on structural load and on the demands of maximal utilization of the type of the reinforced concrete prefab structure system. The structure is made of concrete or steel cells. The project design is based on Soviet projects. The layout is shown of the main power generation units and a section is presented of a 1,000 MW unit. (J.B.). 2 figs

  1. Participatory Design Methods for Collaboration and Communication

    Directory of Open Access Journals (Sweden)

    Tara Wood

    2017-01-01

    Full Text Available Website redesigns can be contentious and fraught in any type of organization, and libraries are no exception. Coming to consensus on priorities and design decisions is nearly impossible, as different groups compete to ensure their subject or specialty area is represented. To keep projects on track and on time, libraries may give a few staff members the authority to make all of the decisions, while keeping user research limited to a small number of usability tests. While these tactics are sometimes necessary, at best they can leave many feeling left out of the process, and at worst, can result in major oversights in the final design. Participatory design methods can bring users and stakeholders into the design process and ultimately lead to a better design and less friction in the project. The authors share their experience and lessons learned using participatory design techniques in a website redesign project at a large, multi-location academic library, and how these techniques facilitated communication, shaped design decisions, and kept a complex, difficult project on track.

  2. Project Management Approaches for Online Learning Design

    Science.gov (United States)

    Eby, Gulsun; Yuzer, T. Volkan

    2013-01-01

    Developments in online learning and its design are areas that continue to grow in order to enhance students' learning environments and experiences. However, in the implementation of new technologies, the importance of properly and fairly overseeing these courses is often undervalued. "Project Management Approaches for Online Learning Design"…

  3. Integrated evaluation framework. Based on the logical framework approach for project cycle management

    International Nuclear Information System (INIS)

    1996-11-01

    This Integrated Evaluation Framework (IEF) was developed by TC Evaluation with the aim of presenting in a comprehensive manner the logic of thinking used when evaluating projects and programmes. Thus, in the first place, the intended audience for this report are evaluation officers, so that when applying the evaluation procedures and check lists, data can be organized following a systematic and logical scheme and conclusions can be derived ''objectively''. The value of such a framework for reporting on performance and in providing a quality reference for disbursements represents one of its major advantages. However, when developing and applying the IEF, it was realized that a Logical Framework Approach (LFA), like the one upon which the IEF is based, needs to be followed throughout the project life cycle, from the Country Programme Framework planning stage, through project design and implementation. Then, the helpful consequences flow into project design quality and smooth implementation. It is only in such an environment that meaningful and consistent evaluation can take place. Therefore the main audience for this report are Agency staff involved in planning, designing and implementing TC projects as well as their counterparts in Member States. In this understanding, the IEF was subjected to review by a consultants meeting, which included both external consultants and Agency staff. This Consultants Review Meeting encouraged the Secretariat to further adopt the LFA into the TC management process

  4. Integrating chronic care with primary care activities: enriching healthcare staff knowledge and skills and improving glycemic control of a cohort of people with diabetes through the First Line Diabetes Care Project in the Philippines

    Directory of Open Access Journals (Sweden)

    Grace Marie V. Ku

    2014-10-01

    Full Text Available Background: This study investigated the effects of integrating primary chronic care with current healthcare activities in two local government health units (LGHU of the Philippines on knowledge and skills of the LGHU staff and clinical outcomes for people with diabetes. Design: Integration was accomplished through health service reorganization, (redistribution of chronic care tasks, and training of LGHU staff. Levels of the staff's pre- and post-training diabetes knowledge and of their self-assessment of diabetes care-related skills were measured. Primary diabetes care with emphasis on self-care development was provided to a cohort of people with diabetes. Glycosylated hemoglobin (HbA1c and obesity measures were collected prior to and one year after full project implementation. Results: The training workshop improved diabetes knowledge (p<0.001 and self-assessed skills (p<0.001 of the LGHU staff. Significant reductions in HbA1c (p<0.001, waist–hip ratio (p<0.001 and waist circumference (p=0.011 of the cohort were noted. Although the reduction in HbA1c was somewhat greater among those whose community-based care providers showed improvement in knowledge and self-assessed skills, the difference was not statistically significant. Conclusions: Primary care for chronic conditions such as diabetes may be integrated with other healthcare activities in health services of low-to-middle-income countries such as the Philippines, utilizing pre-existing human resources for health, and may improve clinical endpoints.

  5. AVLIS Production Plant Project Management Plan

    International Nuclear Information System (INIS)

    1984-01-01

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables

  6. Atmospheric River Tracking Method Intercomparison Project (ARTMIP: project goals and experimental design

    Directory of Open Access Journals (Sweden)

    C. A. Shields

    2018-06-01

    Full Text Available The Atmospheric River Tracking Method Intercomparison Project (ARTMIP is an international collaborative effort to understand and quantify the uncertainties in atmospheric river (AR science based on detection algorithm alone. Currently, there are many AR identification and tracking algorithms in the literature with a wide range of techniques and conclusions. ARTMIP strives to provide the community with information on different methodologies and provide guidance on the most appropriate algorithm for a given science question or region of interest. All ARTMIP participants will implement their detection algorithms on a specified common dataset for a defined period of time. The project is divided into two phases: Tier 1 will utilize the Modern-Era Retrospective analysis for Research and Applications, version 2 (MERRA-2 reanalysis from January 1980 to June 2017 and will be used as a baseline for all subsequent comparisons. Participation in Tier 1 is required. Tier 2 will be optional and include sensitivity studies designed around specific science questions, such as reanalysis uncertainty and climate change. High-resolution reanalysis and/or model output will be used wherever possible. Proposed metrics include AR frequency, duration, intensity, and precipitation attributable to ARs. Here, we present the ARTMIP experimental design, timeline, project requirements, and a brief description of the variety of methodologies in the current literature. We also present results from our 1-month proof-of-concept trial run designed to illustrate the utility and feasibility of the ARTMIP project.

  7. Advancing the IS Curricula: The Identification of Important Communication Skills Needed by IS Staff during Systems Development

    Science.gov (United States)

    Miller, Ruth A.; Luse, Donna W.

    2004-01-01

    Although research indicates communication is important among information systems (IS) staff, users, and managers to ensure successful development projects, the ineffective communication skills of IS staff are often cited as a possible cause of failed IS projects. To develop effective systems, communication between IS users and systems developers…

  8. Evaluation of Embedded System Component Utilized in Delivery Integrated Design Project Course

    Science.gov (United States)

    Junid, Syed Abdul Mutalib Al; Hussaini, Yusnira; Nazmie Osman, Fairul; Razak, Abdul Hadi Abdul; Idros, Mohd Faizul Md; Karimi Halim, Abdul

    2018-03-01

    This paper reports the evaluation of the embedded system component utilized in delivering the integrated electronic engineering design project course. The evaluation is conducted based on the report project submitted as to fulfil the assessment criteria for the integrated electronic engineering design project course named; engineering system design. Six projects were assessed in this evaluation. The evaluation covers the type of controller, programming language and the number of embedded component utilization as well. From the evaluation, the C-programming based language is the best solution preferred by the students which provide them flexibility in the programming. Moreover, the Analog to Digital converter is intensively used in the projects which include sensors in their proposed design. As a conclusion, in delivering the integrated design project course, the knowledge over the embedded system solution is very important since the high density of the knowledge acquired in accomplishing the project assigned.

  9. 75 FR 5632 - Office of New Reactors; Interim Staff Guidance on the Review of Nuclear Power Plant Designs Using...

    Science.gov (United States)

    2010-02-03

    ... Management System (ADAMS) Accession No. ML092640035). This ISG provides new guidance information for applicants submitting a combined license (COL) or design certification (DC) for construction and operation of... (SRP), Section 8.3.1 and Sections 9.5.4 through 9.5.8. The NRC staff issues DC/COL-ISGs to facilitate...

  10. The Soils and Groundwater – EM-20 S&T Roadmap Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-02-11

    The Soils and Groundwater – EM-20 Science and Technology Roadmap Project is a U.S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies and technology for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by EM-20 Roadmap Project staff.

  11. Project organization for automating an industrial power plant

    International Nuclear Information System (INIS)

    Williams, D.R.; McCowen, R.R.

    1988-01-01

    This paper reports on the controls for three boilers and three turbine generators at the power plant at the John Deere Waterloo Works that have been retrofit with a microprocessor based monitoring, control, and optimization system. The factors driving the project in the 15 mW, 500,000 lb/hr, 35 year old plant were reduced electricity costs due to peak shaving, energy conservation, labor savings, reduced maintenance costs and improved reliability. A turnkey design/build arrangement was sought after a preliminary study indicated an attractive return on investment Control system vendors and design/build contractors were evaluated using a group decision making method. A design/build contractor was chosen to do an in-depth study and write specifications for the control system were negotiated with the contractor The project was managed by the Power Plant and Energy Management Department, rather than by the staff department normally responsible for capital projects

  12. Personal Staff - Joint Staff - The National Guard

    Science.gov (United States)

    the ARNG Deputy Director of the ARNG Chief of Staff of the ARNG Command Chief Warrant Officer of the Site Maintenance Battle Focused Training Strategy Battle Staff Training Resources News Publications March Today in Guard History Leadership CNGB VCNGB SEA DANG DARNG Joint Staff J-1 J-2 J-3 J-4 J-5 J-6 J

  13. Does staff diversity imply openness to diversity?

    DEFF Research Database (Denmark)

    Lauring, Jakob; Selmer, Jan

    2013-01-01

    Purpose – Post-secondary educational organizations are currently some of the most diverse settings to be found. However, few educational studies have dealt with staff diversity and hardly any has looked outside the USA. The purpose of this paper is to present a study of members of international...... university departments in Denmark. The authors set out to investigate the relationship between different types of staff diversity and openness to diversity in terms of linguistic, visible, value, and informational heterogeneity. Design/methodology/approach – This study uses responses from 489 staff members......, was unrelated or negatively associated with positive diversity attitudes. Originality/value – Few studies deal with the role of staff diversity and no prior studies the authors know of have examined the link between diversity types and openness to diversity....

  14. 'I believe that the staff have reduced their closeness to patients' : an exploratory study on the impact of HIV/AIDS on staff in four rural hospitals in Uganda

    NARCIS (Netherlands)

    Dieleman, Marjolein; Bwete, Vincent; Maniple, Everd; Bakker, Mirjam; Namaganda, Grace; Odaga, John; van der Wilt, Gert Jan

    2007-01-01

    BACKGROUND: Staff shortages could harm the provision and quality of health care in Uganda, so staff retention and motivation are crucial. Understanding the impact of HIV/AIDS on staff contributes to designing appropriate retention and motivation strategies. This research aimed 'to identify the

  15. AECB staff review of Pickering NGS operations for the year 1988

    International Nuclear Information System (INIS)

    1989-05-01

    The operation of Pickering NGS-A Units 1-4 and Pickering NGS-B Units 5-8 are monitored to ensure compliance with licensing requirements by the AECB Pickering project office staff. This report presents AECB staff's review of major licensing issues and of the operational performance of Pickering NGS during 1988. The report is limited to those aspects that AECB staff considers to have particular safety significance. More detailed information on routine performance is contained in Ontario Hydro's 1988 Quarterly Technical Reports for Pickering NGS-A and Pickering NGS-B

  16. Delft Aerospace Design Projects 2016 : Inspring Designs in Aeronautics, Astronautics and Wind Energy

    NARCIS (Netherlands)

    Melkert, J.A.

    2016-01-01

    This book presents an overview of the results of the Fall Design Synthesis Exercise 2015 and the Spring Design Synthesis Exercise of 2016, based on summaries of each of the projects. The Design Synthesis Exercise Coordination Committee, responsible for the organisation and execution of the exercise,

  17. Delft Aerospace Design Projects 2014 : New Designs in Aeronautics, Astronautics and Wind Energy

    NARCIS (Netherlands)

    Melkert, J.A.

    2014-01-01

    This book presents an overview of the results of the Fall Design Synthesis Exercise 2013 and the Spring Design Synthesis Exercise of 2014, based on summaries of each of the projects. The Design Synthesis Exercise Coordination Committee, responsible for the organisation and execution of the exercise,

  18. Design Fixation and Cooperative Learning in Elementary Engineering Design Project: A Case Study

    Directory of Open Access Journals (Sweden)

    Yi Luo

    2015-09-01

    Full Text Available This paper presents a case study examining 3rd, 4th and 5th graders’ design fixation and cooperative learning in an engineering design project. A mixed methods instrument, the Cooperative Learning Observation Protocol (CLOP, was adapted to record frequency and class observation on cooperative learning engagement through detailed field notes. Students’ design journals and reflections were also analyzed for an inductive qualitative analysis. The findings indicate three major themes of design fixation: 1 fixation on common features of things; 2 fixation on popular teenage culture; 3 fixation on the first design idea. In the cooperative learning process of elementary engineering design project, although pupils had demonstrated some abilities to solve concrete problems in a logical fashion, the participants encountered a number of obstacles in the group. Dominance, social loafing, and other problems occurring in the group process might have offset certain benefits of cooperative learning. Implications of the findings are also discussed.

  19. Design fixation and cooperative learning in elementary engineering design project: A case study

    Directory of Open Access Journals (Sweden)

    Yi Luo

    2015-09-01

    Full Text Available This paper presents a case study examining 3rd, 4th and 5th graders’ design fixation and cooperative learning in an engineering design project. A mixed methods instrument, the Cooperative Learning Observation Protocol (CLOP, was adapted to record frequency and class observation on cooperative learning engagement through detailed field notes. Students’ design journals and reflections were also analyzed for an inductive qualitative analysis. The findings indicate three major themes of design fixation: 1 fixation on common features of things; 2 fixation on popular teenage culture; 3 fixation on the first design idea. In the cooperative learning process of elementary engineering design project, although pupils had demonstrated some abilities to solve concrete problems in a logical fashion, the participants encountered a number of obstacles in the group. Dominance, social loafing, and other problems occurring in the group process might have offset certain benefits of cooperative learning. Implications of the findings are also discussed.

  20. Recognizing Risk-of-Failure in Communication Design Projects

    Science.gov (United States)

    Yee, Joyce; Lievesley, Matthew; Taylor, Louise

    2009-01-01

    The pace of commercial graphic design practice presents very few opportunities to conduct user research after a project's launch. This makes the design team's ability to anticipate and address risks during the design development phase even more important, recognized in the astute observation from Tim Brown, CEO of leading international design…

  1. Capstone Engineering Design Projects for Community Colleges

    Science.gov (United States)

    Walz, Kenneth A.; Christian, Jon R.

    2017-01-01

    Capstone engineering design courses have been a feature at research universities and four-year schools for many years. Although such classes are less common at two-year colleges, the experience is equally beneficial for this population of students. With this in mind, Madison College introduced a project-based Engineering Design course in 2007.…

  2. 'I believe that the staff have reduced their closeness to patients': an exploratory study on the impact of HIV/AIDS on staff in four rural hospitals in Uganda

    NARCIS (Netherlands)

    Dieleman, Marjolein; Bwete, Vincent; Maniple, Everd; Bakker, Mirjam; Namaganda, Grace; Odaga, John; van der Wilt, Gert Jan

    2007-01-01

    Staff shortages could harm the provision and quality of health care in Uganda, so staff retention and motivation are crucial. Understanding the impact of HIV/AIDS on staff contributes to designing appropriate retention and motivation strategies. This research aimed 'to identify the influence of

  3. Information Systems and Corporate Memory: design for staff turn-over

    Directory of Open Access Journals (Sweden)

    Colin Sharp

    1993-11-01

    Full Text Available The "information age" is reliant upon the information skill-base of people and the storage and access of complete data. Staff turn-over and "down-sizing" as well as the rate of organisational change places increased pressure on the designers of corporate information systems to keep up with the organizational demands. Especially relevant are the "soft" aspects of the corporate information needs of organizations. The term "corporate memory" is introduced to explain the relatively informal collective and individual knowledge of employees gained through their experience and position in the organization. This paper elaborates the issues concerned with the "corporate soft data", and makes suggestions for research, as well as for planners of corporate information systems in organizations facing major down-sizing or related changes. It is concluded that there are a number of readily obtainable sources of soft data in the organization and these data should be analysed for inclusion in system development. If organizations are to become learning systems and not just keep repeating the same mistakes, they need to review all aspects of corporate memory, especially the soft data sources and losses.

  4. Computer-integrated design and information management for nuclear projects

    International Nuclear Information System (INIS)

    Gonzalez, A.; Martin-Guirado, L.; Nebrera, F.

    1987-01-01

    Over the past seven years, Empresarios Agrupados has been developing a comprehensive, computer-integrated system to perform the majority of the engineering, design, procurement and construction management activities in nuclear, fossil-fired as well as hydro power plant projects. This system, which is already in a production environment, comprises a large number of computer programs and data bases designed using a modular approach. Each software module, dedicated to meeting the needs of a particular design group or project discipline, facilitates the performance of functional tasks characteristic of the power plant engineering process

  5. Estimating design costs for first-of-a-kind projects

    International Nuclear Information System (INIS)

    Banerjee, Bakul; Fermilab

    2006-01-01

    Modern scientific facilities are often outcomes of projects that are first-of-a-kind, that is, minimal historical data are available for project costs and schedules. However, at Fermilab, there was an opportunity to execute two similar projects consecutively. In this paper, a comparative study of the design costs for these two projects is presented using earned value methodology. This study provides some insights into how to estimate the cost of a replicated project

  6. Managing deliberate self-harm in young people: An evaluation of a training program developed for school welfare staff using a longitudinal research design

    Directory of Open Access Journals (Sweden)

    McGorry Patrick D

    2008-09-01

    Full Text Available Abstract Background Although deliberate self-harm is prevalent among young people, many who engage in deliberate self-harm receive sub-optimal care. Although schools are a well placed setting to support young people who engage in self-harm there are no specific training packages designed to assist school welfare staff to support these young people. The current study aimed to design, deliver and evaluate a training course specifically for school staff. Methods The study employed a longitudinal design. Two hundred and thirteen people participated in the training and evaluation. A questionnaire was administered at baseline, immediately after the training and at 6-month follow-up in order to determine if the training led to improvements in confidence when working with young people who self-harm, perceived skill, knowledge of, and attitudes towards people who self harm. Results Prior to the course, the majority of participants demonstrated relatively high levels of confidence, perceived skill and knowledge of self-harm and endorsed relatively positive attitudes towards people who engage in self-harm. Despite this, significant improvements were observed in terms of increased confidence, increased perceptions of skill along with increased knowledge of deliberate self-harm. These improvements were sustained over the follow-up period. Conclusion The results demonstrated that the provision of specifically designed training can help school welfare staff to feel better equipped to support young people who are engaging in deliberate self-harm.

  7. Training of power station staff

    International Nuclear Information System (INIS)

    Dusserre, J.

    1993-01-01

    ELECTRICITE DE FRANCE currently operates 51 generating stations with 900 and 1300 MW Pressurized Water Reactors while, only 15 years ago, France possessed only a very small number of such stations. It was therefore vital to set up a major training organization to produce staff capable of starting, controlling and maintaining these facilities with a constant eye to improving quality and safety. Operator and maintenance staff training is based on highly-structured training plans designed to match both the post to be filled and the qualifications possessed by the person who is to fill it. It was essential to set up suitable high-performance training resources to handle this fast growth in staff. These resources are constantly being developed and allow EDF to make steady progress in a large number of areas, varying from the effects of human factors to the procedures to be followed during an accident

  8. Navigating Evidence-Based Practice Projects: The Faculty Role.

    Science.gov (United States)

    Moch, Susan D; Quinn-Lee, Lisa; Gallegos, Cara; Sortedahl, Charlotte K

    : An innovative way to facilitate evidence-based practice (EBP) learning and to get evidence into practice is through academic-clinical agency projects involving faculty, undergraduate students, and agency staff. The central role of the faculty is key to successful academic-clinical agency partnerships. Faculty navigate the often difficult process of focusing students and engaging busy staff through initiating, maintaining, and evaluating projects. Students learn valuable EBP skills, staff become engaged in EBP, and the projects are rated highly by agency administrators.

  9. A web-based online collaboration platform for formulating engineering design projects

    Science.gov (United States)

    Varikuti, Sainath

    Effective communication and collaboration among students, faculty and industrial sponsors play a vital role while formulating and solving engineering design projects. With the advent in the web technology, online platforms and systems have been proposed to facilitate interactions and collaboration among different stakeholders in the context of senior design projects. However, there are noticeable gaps in the literature with respect to understanding the effects of online collaboration platforms for formulating engineering design projects. Most of the existing literature is focused on exploring the utility of online platforms on activities after the problem is defined and teams are formed. Also, there is a lack of mechanisms and tools to guide the project formation phase in senior design projects, which makes it challenging for students and faculty to collaboratively develop and refine project ideas and to establish appropriate teams. In this thesis a web-based online collaboration platform is designed and implemented to share, discuss and obtain feedback on project ideas and to facilitate collaboration among students and faculty prior to the start of the semester. The goal of this thesis is to understand the impact of an online collaboration platform for formulating engineering design projects, and how a web-based online collaboration platform affects the amount of interactions among stakeholders during the early phases of design process. A survey measuring the amount of interactions among students and faculty is administered. Initial findings show a marked improvement in the students' ability to share project ideas and form teams with other students and faculty. Students found the online platform simple to use. The suggestions for improving the tool generally included features that were not necessarily design specific, indicating that the underlying concept of this collaborative platform provides a strong basis and can be extended for future online platforms

  10. Assessing the Impact of a Program Designed to Develop Sustainability Leadership amongst Staff Members in Higher Education Institutes: A Case Study from a Community of Practice Perspective

    Science.gov (United States)

    Alkaher, Iris; Avissar, Ilana

    2018-01-01

    This study focuses on the impact of a sustainability leadership development program (SLDP) designed to develop staff members as leaders who encourage sustainability practices within institutions of higher education (IHE). Using the framework of community of practice (CoP), we explored the program's contribution by interviewing 16 staff members who…

  11. Staff development and secondary science teachers: Factors that affect voluntary participation

    Science.gov (United States)

    Corley, Theresa Roebuck

    2000-10-01

    A researcher-designed survey assessed the perceptions of Alabama secondary science public school teachers toward the need for staff development and toward certain staff development strategies and programs. Factors that encouraged or discouraged attendance at voluntary staff development programs and opinions regarding effective and ineffective features of programs were identified. Data were analyzed using descriptive techniques. Percentages and frequencies were noted. Average rankings were computed for the staff development techniques considered most and least effective and for the preferred designs of future staff development offerings. Chi squares were computed to respond to each of the 4 research hypotheses. Narrative discussions and tables were utilized to report the data and provide clarification. This study related demographic information to the research hypotheses. Analysis of the research hypotheses revealed that experienced teachers agree more strongly about the features of staff development programs that they consider effective and about the factors that may affect participation in staff development programs. Analysis of the research questions revealed that secondary science teachers in Alabama agree that staff development is a personal responsibility but that the school systems are responsible for providing staff development opportunities. Teachers believe that staff development is needed annually in both science content and teaching strategies and favor lengthening the school year for staff development. Teachers identified interest level, graduate credit, ability to implement material, scheduling factors, and the reputation of the organizer as the most important factors in determining participation in voluntary staff development programs. Hands-on workshops were identified as the most effective type of voluntary staff development and teachers requested that future staff development experiences include hands-on workshops, networking, curriculum

  12. Design iteration in construction projects – Review and directions

    Directory of Open Access Journals (Sweden)

    Purva Mujumdar

    2018-03-01

    Full Text Available Design phase of any construction project involves several designers who exchange information with each other most often in an unstructured manner throughout the design phase. When these information exchanges happen to occur in cycles/loops, it is termed as design iteration. Iteration is an inherent and unavoidable aspect of any design phase which requires proper planning. Till date, very few researchers have explored the design iteration (“complexity” in construction sector. Hence, the objective of this paper was to document and review the complexities of iteration during design phase of construction projects for efficient design planning. To achieve this objective, exhaustive literature review on design iteration was done for four sectors – construction, manufacturing, aerospace, and software development. In addition, semi-structured interviews and discussions were done with a few design experts to verify the different dimensions of iteration. Finally, a design iteration framework was presented in this study that facilitates successful planning. Keywords: Design iteration, Types of iteration, Causes and impact of iteration, Models of iteration, Execution strategies of iteration

  13. Towards mobile staff members management

    Science.gov (United States)

    Encheva, Sylvia

    2017-07-01

    Todays project management requires a number of abilities which involve finding quick solutions to shortage of staff members with possession of specific qualities. When persons with team responsibilities are under pressure or due to various circumstances are unable to perform exhaustive search in databases, an interactive visualization tool can come in quite handy in finding good solutions unforeseen occurrences. In particular we propose application of selected graphs for facilitating mobile human resource management.

  14. Information management needs for Fort Calhoun's design basis reconstitution project

    International Nuclear Information System (INIS)

    Beach, D.R.; Erickson, E.A.; Gambhir, S.K.; Parsons, R.D.

    1989-01-01

    While the need for information management is not new to the nuclear industry or Omaha Public Power District (OPPD), the interrelationship among design information, multiple systems, and design basis issues has necessitated the management of this information in new ways. The project team involved in the reconstitution of the design basis for OPPD's Fort Calhoun nuclear station has experienced the need for the developed effective methods for managing the vast amount of interrelated information associated with this effort. This management of information has been necessary to ensure that design basis documents (DBDs) adequately reflect the interrelated nature of component, system, and plant design; are complete and accurate; and are produced and maintained in a cost-effective manner. Fort Calhoun's aggressive design basis reconstitution project began in early 1987. The present scope of the project includes the production of 52 system and plant level DBDs; currently the project is ∼50% complete with DBDs in various stages of completion, from pilot DBDs through DBDs with approved formats, which have been issued for use. The experience in producing these documents has lead to a growing understanding of the special need for information management in each stage of the project. The development of the information tracking and management processes for the various stages of DBD development has proven to be cost-effective and gives a level of assurance that information has been included in the DBDs consistently and accurately

  15. Designing forestry projects for climate action plan implementation

    Energy Technology Data Exchange (ETDEWEB)

    Sampson, R.N. [American Forests, Washington, DC (United States)

    1995-11-01

    Forests play an important role in sequestering and storing carbon in terrestrial ecosystems, so countries considering ways to mitigate greenhouse gas emissions are looking at forestry projects as one option. Designing forestry projects that accomplish desired goals is no simple task however, as many past failures attest. This paper proposes that, to be successful, climate change mitigation forestry projects need to: (a) feature other socially, economically and environmentally desirable goals as primary motivators; (b) be designed in cooperation with, and in the interests of, local populations, and (c), feature cooperative efforts between government, industry, and volunteer associations. Volunteer associations can often be assisted in being a more capable partner through an organizational training and support process, and this is one of the services offered to cooperating countries through American Forests. 21 refs.

  16. Staff accuse bosses of secrecy over British synchrotron plans

    CERN Multimedia

    Loder, N

    1999-01-01

    Scientific staff at Daresbury who have worked on the Diamond project for many years, believe senior management has kept them in the dark over discussions about the possible siting of the synchrotron at RAL (1 page).

  17. Training for staff who support students.

    Science.gov (United States)

    Flynn, Eleanor; Woodward-Kron, Robyn; Hu, Wendy

    2016-02-01

    Front-line administrative, academic and clinical teaching staff often find themselves providing pastoral and learning support to students, but they are often not trained for this role, and this aspect of their work is under-acknowledged. Staff participating in an action research study at two medical schools identified common concerns about the personal impact of providing student support, and of the need for professional development to carry out this responsibility. This need is magnified in clinical placement settings that are remote from on-campus services. Informed by participatory action research, brief interactive workshops with multimedia training resources were developed, conducted and evaluated at eight health professional student training sites. These workshops were designed to: (1) be delivered in busy clinical placement and university settings; (2) provide a safe and inclusive environment for administrative, academic and clinical teaching staff to share experiences and learn from each other; (3) be publicly accessible; and (4) promote continued development and roll-out of staff training, adapted to each workplace (see http://www.uws.edu.au/meusupport). The workshops were positively evaluated by 97 participants, with both teaching and administrative staff welcoming the opportunity to discuss and share experiences. Staff supporting health professional students have shared, often unmet, needs for support themselves Staff supporting health professional students have shared, often unmet, needs for support themselves. Participatory action research can be a means for producing and maintaining effective training resources as well as the conditions for change in practice. In our workshops, staff particularly valued opportunities for guided discussion using videos of authentic cases to trigger reflection, and to collaboratively formulate student support guidelines, customised to each site. © 2015 John Wiley & Sons Ltd.

  18. Project management process.

    Science.gov (United States)

    2007-03-01

    This course provides INDOT staff with foundational knowledge and skills in project management principles and methodologies. INDOTs project management processes provide the tools for interdisciplinary teams to efficiently and effectively deliver pr...

  19. Impact of nutritional interventions on food consumption pattern changes of workers and staff

    Directory of Open Access Journals (Sweden)

    Maryam Boshtam

    2011-10-01

    Full Text Available Background: Worksite Intervention Project from Isfahan Healthy Heart Program aiming at modifying life style of workers and staff in Isfahan and Najafabad (intervention areas, and Arak (reference area carried out for 5 years. Nutritional interventions are one of the interventions of this project. This research aiming at studying the effect of these interventions on food consumption pattern changes carried out in workers and staff of Isfahan and Najafabad. Materials and Method: Food consumption pattern by food frequency questionnaire and demographic information of this group were collected before, after and annually during the intervention. Data were analyzed by Genera Linear Models (GLM, descriptive and trend analysis. Results: Beverage and hydrogenated oil consumption decreased and fruits and vegetables increased in workers and staff of intervention area more than reference area (p0.27. Compare to reference society fast food consumption in office staff of intervention society was increased (p<0.001.Conclusion: We conclude that nutritional interventions have favorite effects on practice of workers and staff of this Iranian population and interventions used in this study can use as applicable interventions for similar societies

  20. Antiradiation pharmacological protection of the 'Shelter' staff

    International Nuclear Information System (INIS)

    Gorovoj, L.F.; Danilov, V.M.; Senyuk, O.F.

    2002-01-01

    The stressful effects and discomfortable working conditions of the 'Shelter' staff demand strengthening of protective systems ensuring acclimatization of an organism to penetration irradiation and other harmful factors. Thus, the drugs for antiactinic protection of staff OY should have properties adaptive drugs. Complex biological preparation Mycoton has this broad spectrum of antiradiation properties. This drug is designed in Ukraine on the basis of biopolmers of a cell-like wall of funguses: chitin, glucan and melanins

  1. Instructional Design and Project Management: Complementary or Divergent?

    Science.gov (United States)

    van Rooij, Shahron Williams

    2011-01-01

    This paper reports the results of a study to identify the extent to which organizations that develop educational/training products are committed to project management, as measured by their project management implementation maturity, as a methodology that is separate and distinct from the processes of instructional design. A Web survey was…

  2. Design review plan for Multi-Function Waste Tank Facility (Project W-236A)

    International Nuclear Information System (INIS)

    Renfro, G.G.

    1994-01-01

    This plan describes how the Multi-Function Waste Tank Facility (MWTF) Project conducts reviews of design media; describes actions required by Project participants; and provides the methodology to ensure that the design is complete, meets the technical baseline of the Project, is operable and maintainable, and is constructable. Project W-236A is an integrated project wherein the relationship between the operating contractor and architect-engineer is somewhat different than that of a conventional project. Working together, Westinghouse Hanford Company (WHC) and ICF Karser Hanford (ICF KH) have developed a relationship whereby ICF KH performs extensive design reviews and design verification. WHC actively participates in over-the-shoulder reviews during design development, performs a final review of the completed design, and conducts a formal design review of the Safety Class I, ASME boiler and Pressure Vessel Code items in accordance with WHC-CM-6-1, Standard Engineering Practices

  3. Group Projects in Interior Design Studio Classes: Peer Feedback Benefits

    Science.gov (United States)

    Jurado, Juan A.

    2011-01-01

    Group projects have been shown to be effective for providing peer feedback in classrooms. While students in regular enrollment classes benefit from peer feedback, low-enrollment classes face many challenges. This study compares peer feedback effectiveness between two interior design studio classes with different design projects. In one class,…

  4. Building a Creative Ecosystem: The Young Designers on Location Project

    Science.gov (United States)

    Davies, Dan; Howe, Alan; Haywood, Susan

    2004-01-01

    This article reports on findings from a research project designed to explore ways in which creativity can be fostered through interactions between selected children, particular environments, materials, techniques and key adults. The Young Designers on Location (YDoL) project was funded by the National Endowment for Science, Technology and the Arts…

  5. Analysis of core damage frequency from internal events: Expert judgment elicitation. Part 1: Expert panel results. Part 2: Project staff results

    Energy Technology Data Exchange (ETDEWEB)

    Wheeler, T A; Cramond, W R [Sandia National Laboratories, Albuquerque, NM (United States); Hora, S C [University of Hawii at Hilo (United States); Unwin, S D [Brookhaven National Laboratory (United States)

    1989-04-01

    Quantitative modeling techniques have limitations as to the resolution of important issues in probabilistic risk assessment (PRA). Not all issues can be resolved via the existing set of methods such as fault trees, event trees, statistical analyses, data collection, and computer simulation. Therefore, an expert judgment process was developed to address issues perceived as important to risk in the NUREG-1150 analysis but which could not be resolved with existing techniques. This process was applied to several issues that could significantly affect the internal event core damage frequencies of the PRAs performed on six light water reactors. Detailed descriptions of these issues and the results of the expert judgment elicitation are reported here, as well as an explanation of the methodology used and the procedure followed in performing the overall elicitation task. The process is time-consuming and expensive. However, the results are very useful, and represent an improvement over the draft NUREG-1150 analysis in the areas of expert selection, elicitation training, issue selection and presentation, elicitation of judgment and aggregation of results. The results are presented in two parts. Part documents the expert panel elicitations, where the most important issues were presented to a panel of experts convened from throughout the nuclear power risk assessment community. Part 2 documents the process by which the project staff performed expert judgment on other important issues, using the project staff as panel members. (author)

  6. Design considerations for the Yucca Mountain project exploratory shaft facility

    International Nuclear Information System (INIS)

    Bullock, R.L. Sr.

    1990-01-01

    This paper reports on the regulatory/requirements challenges of this project which exist because this is the first facility of its kind to ever be planned, characterized, designed, and built under the purview of a U.S. Nuclear Regulatory Agency. The regulations and requirements that flow down to the Architect/Engineer (A/E) for development of the Exploratory Shaft Facility (ESF) design are voluminous and unique to this project. The subsurface design and construction of the ESF underground facility may eventually become a part of the future repository facility and, if so, will require licensing by the Nuclear Regulatory Commission (NRC). The Fenix and Scisson of Nevada-Yucca Mountain Project (FSN-YMP) group believes that all of the UMP design and construction related activities, with good design/construct control, can be performed to meet all engineering requirements, while following a strict quality assurance program that will also meet regulatory requirements

  7. Strategy-Based Development of Teacher Educators' ICT Competence through a Co-operative Staff Development Project

    Science.gov (United States)

    Lavonen, Jari; Lattu, Matti; Juuti, Kalle; Meisalo, Veijo

    2006-01-01

    An ICT strategy and an implementation plan for teacher education were created in a co-operative process. Visions and expectations of staff members and students were registered by questionnaires and by making notes during sessions in which the strategy was created. Thereafter, an implementation document, where the staff development programme and…

  8. Enhancing co-operation between AVN, IRSN and GRS: the junior staff pilot project on the comparative testing of IPA codes

    International Nuclear Information System (INIS)

    Hoyos, A. de; Keesmann, S.; Smidts, O.

    2006-01-01

    - Objectives: The project takes place within the framework of the Junior Staff Program of AVN, GRS and IRSN which aims at creating a junior staff network among European TSOs. The objective of this project is to apply integrated performance assessment (IPA) tools used by AVN, IRSN and GRS to two generic and simplified models (Bure site in France and Mol site in Belgium) for disposal systems in argillaceous formations. The comparison of the results from different codes applied to the disposal systems of the two mentioned sites aims at a better understanding of the confinement capabilities of the considered geological formations and of the IPA methodology in general. The incentive is a common understanding of approaches developed by each partner and the improvement of this expertise. More specifically, this pilot project aims at enhancing exchanges of views and mutual experiences in the field of understanding major safety functions. - Tools and Methods: A new code for the assessment of barrier systems in argillaceous formations has only recently been developed at GRS, as in the past such formations played a minor role as a possible hosting environment for a repository in Germany. The project also serves as a test case for this code. The considered disposal systems are defined on the basis of the concepts and data available for Mol and Bure. The program packages used for the performance assessment calculations are: HYDRUS-1D with source term module (AVN), GoldSim (IRSN) and EMOS-modules CLAYPOS and CHET (GRS). While the coupling of HYDRUS-1D with a source term module and the EMOS-modules are FORTRAN77- coded programs specifically developed for the simulation of parts of a barrier system of a final repository, GoldSim is a general purpose simulation environment with an integrated graphical user interface for modelling and data output. Models realized in GoldSim are flexible and can be easily adapted to new requirements. The software also offers an intrinsic

  9. Designing pilot projects as boundary objects a Brazilian case study in the promotion of sustainable design

    CERN Document Server

    Zurlo, Francesco

    2016-01-01

    This book describes a collaborative Design Pilot Project held in Brazil (called MODU.Lares) involving micro and small enterprises and other actors in the furniture sector. The experience was based on an action research method and evaluated by using a tool, in order to assess the value of pilot project as a boundary object capable of fostering innovation and sustainability. The impact of the Design Pilot Project in triggering change in a fragmented local system with a poor environmental and social record, as well as management and innovation issues, were assessed with the help of the same tool, taking into account environmental, technological, economic, sociocultural, and organizational indicators. The collaborative network established was chiefly based on four elements: prototypes, meetings, exhibitions and the Pilot Project (as an overall process). The results indeed demonstrate that a Design Pilot Project can be a valid instrument for establishing a collaborative environment that promotes sustainability an...

  10. Engaging Frontline Leaders and Staff in Real-Time Improvement.

    Science.gov (United States)

    Phillips, Jennifer; Hebish, Linda J; Mann, Sharon; Ching, Joan M; Blackmore, C Craig

    2016-04-01

    The relationship of staff satisfaction and engagement to organizational success, along with the integral influence of frontline managers on this dimension, is well established in health care and other industries. To specifically address staff engagement, Virginia Mason Medical Center, an integrated, single-hospital health system, developed an approach that involved leaders, through the daily use of standard work for leaders, as well as staff, through a Lean-inspired staff idea system. Kaizen Promotion Office (KPO) staff members established three guiding principles: (1) Staff engagement begins with leader engagement; (2) Integrate daily improve- ment (kaizen) as a habitual way of life not as an add-on; and (3) Create an environment in which staff feel psycho- logically safe and valued. Two design elements--Standard Work for Leaders (SWL) and Everyday Lean Ideas (ELIs) were implemented. For the emergency department (ED), an early adopter of the staff engagement work, the challenge was to apply the guiding principles to improve staff engagement while improving quality and patient and staff satisfaction, even as patient volumes were increasing. Daily huddles for the KPO staff members and weekly leader rounds are used to elicit staff ideas and foster ELIs in real time. Overall progress to date has been tracked in terms of staff satisfaction surveys, voluntary staff turnover, adoption of SWL, and testing and implementation of staff ideas. For example, voluntary turnover of ED staff decreased from 14.6% in 2011 to 7.5% in 2012, and 2.0% in 2013. Organizationwide, at least 800 staff ideas are in motion at any given time, with finished ones posted in an idea supermarket website. A leadership and staff engagement approach that focuses on SWL and on capturing staff ideas for daily problem solving and improvement can contribute to organization success and improve the quality of health care delivery.

  11. OSU TOMF Program Site Selection and Preliminary Concept Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Spadling, Steve [Oklahoma State Univ., Stillwater, OK (United States)

    2012-05-10

    The purpose of this report is to confirm the programmatic requirements for the new facilities, identify the most appropriate project site, and develop preliminary site and building concepts that successfully address the overall project goals and site issues. These new facilities will be designed to accommodate the staff, drivers and maintenance requirements for the future mixed fleet of passenger vehicles, Transit Style Buses and School Buses.

  12. Special Staff - Joint Staff - Leadership - The National Guard

    Science.gov (United States)

    the ARNG Deputy Director of the ARNG Chief of Staff of the ARNG Command Chief Warrant Officer of the Site Maintenance Battle Focused Training Strategy Battle Staff Training Resources News Publications March Today in Guard History Leadership CNGB VCNGB SEA DANG DARNG Joint Staff J-1 J-2 J-3 J-4 J-5 J-6 J

  13. Problem based Learning versus Design Thinking in Team based Project work

    DEFF Research Database (Denmark)

    Denise J. Stokholm, Marianne

    2014-01-01

    project based learning issues, which has caused a need to describe and compare the two models; in specific the understandings, approaches and organization of learning in project work. The PBL model viewing the process as 3 separate project stages including; problem analysis, problem solving and project......All educations at Aalborg University has since 1974 been rooted in Problem Based Learning (PBL). In 1999 a new education in Industrial design was set up, introducing Design Based Learning (DBL). Even though the two approaches have a lot in common they also hold different understandings of core...... report, with focus on problem solving through analysis. Design Based Learning viewing the process as series of integrated design spaces including; alignment, research, mission, vision, concept, product and process report, with focus on innovative ideation though integration. There is a need of renewing...

  14. Spent Nuclear Fuel (SNF) Project Design Verification and Validation Process

    International Nuclear Information System (INIS)

    OLGUIN, L.J.

    2000-01-01

    This document provides a description of design verification and validation activities implemented by the Spent Nuclear Fuel (SNF) Project. During the execution of early design verification, a management assessment (Bergman, 1999) and external assessments on configuration management (Augustenburg, 1999) and testing (Loscoe, 2000) were conducted and identified potential uncertainties in the verification process. This led the SNF Chief Engineer to implement corrective actions to improve process and design products. This included Design Verification Reports (DVRs) for each subproject, validation assessments for testing, and verification of the safety function of systems and components identified in the Safety Equipment List to ensure that the design outputs were compliant with the SNF Technical Requirements. Although some activities are still in progress, the results of the DVR and associated validation assessments indicate that Project requirements for design verification are being effectively implemented. These results have been documented in subproject-specific technical documents (Table 2). Identified punch-list items are being dispositioned by the Project. As these remaining items are closed, the technical reports (Table 2) will be revised and reissued to document the results of this work

  15. Application of project design peer review to improve quality assurance

    International Nuclear Information System (INIS)

    McClure, F.E.

    1989-01-01

    DOE ORDER 5481.1B Safety Analysis and Review Systems and DOE ORDER 6430.1A General Design Criteria require that the design of facilities shall incorporate the necessary Quality Assurance review requirements to assure that the established program quality assurance objectives are met in the design criteria and the construction documents. The use of Project Design Peer Review to satisfy these requirements is presented. The University of California manages the Lawrence Berkeley Laboratory, the Lawrence Livermore National Laboratory, and the Los Alamos National Scientific Laboratory. The 1988 University Seismic Safety Policy requires the use of independent Project Design Peer Review in its capital improvement and seismic reconstruction program

  16. Delft Aerospace Design Projects 2015 : Challenging New Designs in Aeronautics, Astronautics and Wind Energy

    NARCIS (Netherlands)

    Melkert, J.A.

    2015-01-01

    This book presents an overview of the results of the Fall Design Synthesis Exercise 2014 and the Spring Design Synthesis Exercise of 2015, based on summaries of each of the projects. The Design Synthesis Exercise Coordination Committee, responsible for the organisation and execution of the exercise,

  17. What Happens When the Musicians Leave? Case Study of a Jessie’s Fund Project to Develop Teachers’ Skills and Confidence

    Directory of Open Access Journals (Sweden)

    Tom Northey

    2013-07-01

    Full Text Available This article describes a project delivered by Jessie’s Fund, a UK charity which supports children through music therapy and creative music work. The project took place between January and July 2012 and involved staff and pupils from a special school in the north of England. The article describes briefly how music is delivered in special schools across the UK and explains some of the challenges Jessie’s Fund has faced in having a lasting impact on how schools cover the music curriculum for children with complex needs. In 2012 Jessie’s Fund partnered with a special school in the north of England to design a new approach which focused intensively on the development needs of staff. Jessie’s Fund musicians visited pairs of staff over a period of six months to build their skills and confidence in leading music sessions with their pupils. The project was considerably more effective than some previous ‘musician-led’ activities and had a significant, whole-school impact. This article describes the work that took place, the responses from the staff involved and how Jessie’s Fund intends to use this learning for future projects.

  18. A series of student design projects for improving and modernizing safety helmets

    NARCIS (Netherlands)

    Beurden, van K.M.M. (Karin); Boer, de J. (Johannes); Stilma, M. (Margot); Teeuw, W.B. (Wouter)

    2014-01-01

    The Saxion Research Centre for Design and Technology employs many students during research projects. This paper discusses a series of student design projects on safety helmets in the Safety@Work project. At construction sites workers are required to wear personal protective equipment during their

  19. Project Assessment Framework through Design (PAFTD) - A Project Assessment Framework in Support of Strategic Decision Making

    Science.gov (United States)

    Depenbrock, Brett T.; Balint, Tibor S.; Sheehy, Jeffrey A.

    2014-01-01

    Research and development organizations that push the innovation edge of technology frequently encounter challenges when attempting to identify an investment strategy and to accurately forecast the cost and schedule performance of selected projects. Fast moving and complex environments require managers to quickly analyze and diagnose the value of returns on investment versus allocated resources. Our Project Assessment Framework through Design (PAFTD) tool facilitates decision making for NASA senior leadership to enable more strategic and consistent technology development investment analysis, beginning at implementation and continuing through the project life cycle. The framework takes an integrated approach by leveraging design principles of useability, feasibility, and viability and aligns them with methods employed by NASA's Independent Program Assessment Office for project performance assessment. The need exists to periodically revisit the justification and prioritization of technology development investments as changes occur over project life cycles. The framework informs management rapidly and comprehensively about diagnosed internal and external root causes of project performance.

  20. "The Whole Is Greater Than the Sum of the Parts": Prison Staff Perceptions of Domestic Violence Rehabilitation Programs.

    Science.gov (United States)

    Shoham, Efrat; Zelig, Anat; Hasisi, Badi; Weisburd, David; Haviv, Noam

    2017-11-01

    This qualitative study is part of a mixed methods research project that examined the effectiveness of the primary rehabilitation program for domestic violence offenders in the Israeli Prison Services-the "House of Hope." The quantitative part of the study showed that the "House of Hope" program was effective in reducing recidivism among participating inmates. The purpose of this qualitative study was to describe the rehabilitation program according to the perspectives of the program staff. For this purpose, semistructured interviews were conducted with the department staff during the study as well as with past directors. The qualitative findings suggested that the success of the program probably stemmed from a synergistic combination of several components, for example, identifying the characteristics of domestic violence offenders and adjusting treatment programs to their needs, along with exposure to psychological treatment in varied therapies (cognitive behavioral therapy, psychoeducational, and psychodynamic) and formats (group therapy and individual therapy) during a 1-year stay in a hierarchical therapeutic community. Other components mentioned are staff professionalism, stability, and the program's location in a therapeutic-oriented prison that is architecturally designed and built to create a less stressful environment for the inmates and the staff.

  1. Introducing Project-Based Learning to Design Enterprises for Creativity

    DEFF Research Database (Denmark)

    Wang, Feng; Zhou, Chunfang; Chen, Hongbing

    2013-01-01

    This paper aims to emphasize the necessity of introducing Project-Based Learning (PBL) to design enterprises in order to foster designers creativity and facilitate innovation of design enterprises. According to the literature review, creativity can be viewed as the first stage of innovation; PBL...

  2. Nurse Managers’ Perceptions and Experiences Regarding Staff Nurse Empowerment: A Qualitative Study

    Directory of Open Access Journals (Sweden)

    Peter eVan Bogaert

    2015-10-01

    Full Text Available AimTo study nurse managers’ perceptions and experiences with staff nurse structural empowerment and the impact on the nurse manager leadership role and style.BackgroundNurse managers’ leadership roles may be viewed as challenging given the complex needs of patients in the context of staff nurses’ involvement in clinical as well organizational decision-making processes, in interdisciplinary care settings.DesignQualitative phenomenological study MethodsIndividual semi-structured interviews of 8 medical or surgical nurse managers were conducted in a 600-bed Belgian university hospital between December 2013 and June 2014. This organization was undergoing a transformational process to convert from a classic hierarchical and departmental structure to one that was flat and interdisciplinary.ResultsNurse managers were familiar with and held positive attitudes about nurse structural empowerment in the hospital. They conveyed the positive impact of empowerment on their staff nurses that in turn improved the quality of care and patient safety. Structural empowerment was supported by several change initiatives at the unit and hospital levels and nurse managers’ experiences with these initiatives was reported as mixed because of the changing demands on their manager role and leadership style. In addition, pressure was experienced both by staff nurses and nurse managers through direct patient care priorities, tightly scheduled projects and miscommunication.ConclusionNurse managers reported a favourable impact of structural empowerment on staff nurses’ professional attitudes and the safety and quality of care on their units. However, they also reported that the empowerment process, created changing demands in the manager role as well as daily practice dilemmas with regard to needed leadership styles. Clear organisational goals and dedicated support for nurses as well as nursing unit managers will be imperative to sustain an empowered practice

  3. Promoting oral health care among people living in residential aged care facilities: Perceptions of care staff.

    Science.gov (United States)

    Villarosa, Amy R; Clark, Sally; Villarosa, Ariana C; Patterson Norrie, Tiffany; Macdonald, Susan; Anlezark, Jennifer; Srinivas, Ravi; George, Ajesh

    2018-04-23

    This study aimed to look at the practices and perspectives of residential aged care facility (RACF) care staff regarding the provision of oral health care in RACFs. Emphasis has been placed on the provision of adequate oral health care in RACFs through the Better Oral Health in Residential Aged Care programme. Endorsed by the Australian government, this programme provided oral health education and training for aged care staff. However, recent evidence suggests that nearly five years after the implementation of this programme, the provision of oral care in RACFs in NSW remains inadequate. This project utilised an exploratory qualitative design which involved a focus group with 12 RACF care staff. Participants were asked to discuss the current oral health practices in their facility, and their perceived barriers to providing oral health care. The key findings demonstrated current oral health practices and challenges among care staff. Most care staff had received oral health training and demonstrated positive attitudes towards providing dental care. However, some participants identified that ongoing and regular training was necessary to inform practice and raise awareness among residents. Organisational constraints and access to dental services also limited provision of dental care while a lack of standardised guidelines created confusion in defining their role as oral healthcare providers in the RACF. This study highlighted the need for research and strategies that focus on capacity building care staff in oral health care and improving access of aged care residents to dental services. © 2018 John Wiley & Sons A/S and The Gerodontology Association. Published by John Wiley & Sons Ltd.

  4. Design for Sustainability and Project Management Literature – A Review

    DEFF Research Database (Denmark)

    Ali, Faheem; Boks, Casper; Bey, Niki

    2016-01-01

    management literature has hardly been considered in design for sustainability research, this article attempts to review the points of intersection between these two fields, and explores the potential that knowledge from project management literature has in improving efficiency and effectiveness...... of development and implementation of design for sustainability tools.......The growing pressure on natural resources and increasing global trade have made sustainability issues a prime area of concern for all businesses alike. The increased focus on sustainability has impacted the way projects are conceived, planned, executed and evaluated in industries. Since project...

  5. Staff members' perceptions of an animal-assisted activity.

    Science.gov (United States)

    Bibbo, Jessica

    2013-07-01

    To examine the perceptions of staff members toward the implementation of an animal-assisted activity (AAA) in an outpatient regional cancer center. Quasi-experimental, post-test design. An adult outpatient regional cancer center in northern California. 34 facility staff members. Self-report questionnaire following four weeks of AAA visitation. Visits took place three times a week for a total of 12 visits. Perceptions of the AAA. Previous perceptions toward AAA influenced the perceptions of the visitation's efficacy. Direct and indirect interaction with the visiting AAA teams was positively associated with perceptions of the AAA. A disagreement occurred that the AAA had caused extra stress or work for staff. Enjoyment of interacting with the dog handler was not significantly different from interacting with the dog; however, it was more positively correlated to acceptance of the AAA. The study provided evidence that the AAA was generally accepted by staff members. Individual staff members' perceptions of dogs and AAAs can influence their receptivity to AAA interventions. Interaction with AAA teams should be voluntary and available for patients and staff members. AAA may be introduced into facilities without creating the perception of extra stress or work for staff members. Providing staff the opportunity to interact with visiting AAA teams may be beneficial for the success of such programs. The human handler in AAA teams may play a vital role in the staff acceptance of such programs.

  6. The feeling of family success and the professional burnout syndrome among penitentiary staff (a draft of a research project

    Directory of Open Access Journals (Sweden)

    Agnieszka Barczykowska

    2011-12-01

    Full Text Available Mutual relations between family and professional life have been for many years one of the most important fields of research in economics, sociology and, more and more often, pedagogy, which focuses on searching for factors protecting from the development of burnout syndrome and aims at increasing the effectiveness of pedagogic efforts. Due to the above, this article, being a draft of a research project, is dedicated to the facilitating effect of family life on professional life of the penitentiary staff. The authors take a stance that the feeling of satisfaction from family life can not only significantly neutralize the feeling of failure but, primarily, contribute to the search for more and more innovative forms of work.

  7. Application of project management methodology in design management of nuclear safety related structure

    International Nuclear Information System (INIS)

    Chen Mao

    2004-01-01

    This paper focuses on the application of project management methodology in the design management of Nuclear Safety Related Structure (NSRS), considering the design management features of its civil construction. Based on the experiences from the management of several projects, the project management triangle is proposed to be used in the management, to well treat the position of design interface in the project management. Some other management methods are also proposed

  8. Midwestern High-Level Radioactive Waste Transportation Project

    International Nuclear Information System (INIS)

    1993-01-01

    On February 17,1989, the Midwestern Office of The Council of State Governments and the US Department of Energy entered into a cooperative agreement authorizing the initiation of the Midwestern High-Level Radioactive Waste Transportation Project. The transportation project continued to receive funding from DOE through amendments to the original cooperative agreement, with December 31, 1993, marking the end of the initial 5-year period. This progress report reflects the work completed by the Midwestern Office from February 17,1989, through December 31,1993. In accordance with the scopes of work governing the period covered by this report, the Midwestern Office of The Council of State Governments has worked closely with the Midwestern High-Level Radioactive Waste Committee. Project staff have facilitated all eight of the committee's meetings and have represented the committee at meetings of DOE's Transportation Coordination Group (TCG) and Transportation External Coordination Working Group (TEC/WG). Staff have also prepared and submitted comments on DOE activities on behalf of the committee. In addition to working with the committee, project staff have prepared and distributed 20 reports, including some revised reports (see Attachment 1). Staff have also developed a library of reference materials for the benefit of committee members, state officials, and other interested parties. To publicize the library, and to make it more accessible to potential users, project staff have prepared and distributed regular notices of resource availability

  9. Share and share alike: encouraging the reuse of academic resources through the Scottish electronic Staff Development Library

    Directory of Open Access Journals (Sweden)

    Lorna M. Campbell

    2001-12-01

    Full Text Available The Scottish electronic Staff Development Library (http://www.sesdl.scotcit.acuk is an ongoing collaborative project involving the Universities of Edinburgh, Paisley and Strathclyde which has been funded by SHEFC as part of their current ScotCIT Programme (http:llwww.scotcit.ac.uk. This project is being developed in response to the increasing demand for flexible, high-quality staff development materials.

  10. Exploring the dynamics of ownership in community-oriented design projects

    DEFF Research Database (Denmark)

    Light, Ann; Hansen, Nicolai Brodersen; Halskov, Kim

    2013-01-01

    This paper contributes an exploration of ownership as a dynamic process in community-oriented projects. We use case study accounts of two design projects to consider participation in contexts where social structure is relevant to design outcomes. In studying these dynamics, we consider four aspec...... community groups in making internet radio podcasts to share insight. We examine the complexity of the social process involved and trace patterns of change, before concluding with pragmatic and ethical reasons for technology design to pay attention to ownership issues....

  11. Cancer Ward Staff Group: An Intervention Designed to Prevent Disaster.

    Science.gov (United States)

    Barber, William H.

    1985-01-01

    Describes a case study illustrating organizational and system contingencies for introducing and maintaining a support group for oncology nursing staff in a large general hospital culture. Criteria for long-run survivability of innovation in a work system are applied to a group structured like that described by Balint for training physicians in…

  12. Case study B. Architectural design management using a project web

    NARCIS (Netherlands)

    DeClerck, F.; Pels, H.J.; Otter, den A.F.H.J.; Emmitt, S.; Prins, M.; Otter, den A.F.

    2009-01-01

    In this chapter the use and organization of use of a project website is described in the design and realization of a construction project. The case concerns a complicated project with a high number of different parties involved, managed by an architectural office and having an internationally

  13. Error begat error: design error analysis and prevention in social infrastructure projects.

    Science.gov (United States)

    Love, Peter E D; Lopez, Robert; Edwards, David J; Goh, Yang M

    2012-09-01

    Design errors contribute significantly to cost and schedule growth in social infrastructure projects and to engineering failures, which can result in accidents and loss of life. Despite considerable research that has addressed their error causation in construction projects they still remain prevalent. This paper identifies the underlying conditions that contribute to design errors in social infrastructure projects (e.g. hospitals, education, law and order type buildings). A systemic model of error causation is propagated and subsequently used to develop a learning framework for design error prevention. The research suggests that a multitude of strategies should be adopted in congruence to prevent design errors from occurring and so ensure that safety and project performance are ameliorated. Copyright © 2011. Published by Elsevier Ltd.

  14. Design and implementation of a project-based active/cooperative engineering design course for freshmen

    Science.gov (United States)

    Abdulaal, R. M.; Al-Bahi, A. M.; Soliman, A. Y.; Iskanderani, F. I.

    2011-08-01

    A project-based active/cooperative design course is planned, implemented, assessed and evaluated to achieve several desired engineering outcomes. The course allows freshman-level students to gain professional hands-on engineering design experience through an opportunity to practise teamwork, quality principles, communication skills, life-long learning, realistic constraints and awareness of current domestic and global challenges. Throughout successive design reports and in-class assignments, the students are required by the end of the semester to communicate, clearly and concisely, the details of their design both orally and in writing through a functional artefact/prototype, a design notebook, an A0 project poster and a final oral presentation. In addition to these direct assessment tools, several indirect measures are used to ensure triangulation. Assignments are based on customer expectations using a detailed checklist. This paper shows the direct and indirect assessment tools that indicated a high level of achievement of course learning outcomes and a high level of student satisfaction.

  15. Implications of research staff demographics for psychological science.

    Science.gov (United States)

    Does, Serena; Ellemers, Naomi; Dovidio, John F; Norman, Jasmine B; Mentovich, Avital; van der Lee, Romy; Goff, Phillip Atiba

    2018-03-01

    Long-standing research traditions in psychology have established the fundamental impact of social categories, such as race and gender, on people's perceptions of themselves and others, as well as on the general human cognition and behavior. However, there is a general tendency to ignore research staff demographics (e.g., researchers' race and gender) in research development and research reports. Variation in research staff demographics can exert systematic and scientifically informative influences on results from psychological research. Consequently, research staff demographics need to be considered, studied, and/or reported, along with how these demographics were allowed to vary across participants or conditions (e.g., random assignment, matched with participant demographics, or included as a factor in the experimental design). In addition to providing an overview of multidisciplinary evidence of research staff demographics effects, we discuss how research staff demographics might influence research findings through (a) ingroup versus outgroup effects, (b) stereotype and (implicit) bias effects, and (c) priming and social tuning effects. Finally, an overview of recommended considerations is included (see the Appendix) to help illustrate how to systematically incorporate relevant research staff demographics in psychological science. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  16. Developing the mental health awareness of prison staff in England and Wales.

    Science.gov (United States)

    Walsh, Elizabeth; Freshwater, Dawn

    2009-10-01

    In 2010, the prison population in England and Wales could reach a high of 91,500, according to a recent population projection. HM Prison Service (U.K.) reports that in 2004 to 2005, there were 33,144 prison officers employed to care for the prisoners in the prison system. This article focuses on the mental health of this prisoner population and the training needs of staff caring for them. It reports the experience of a national project, funded by the Department of Health, in which the project team developed and piloted mental health awareness training for prison officers on the residential units and for staff who work with prisoners and lack a mental health background. Key findings from the posttraining evaluation are highlighted. Participant feedback demonstrates the value placed on this type of training by those working in the prison setting.

  17. Academic integrity and plagiarism: perceptions and experience of staff and students in a school of dentistry: a situational analysis of staff and student perspectives.

    Science.gov (United States)

    Ford, P J; Hughes, C

    2012-02-01

    This project has investigated student and staff perceptions and experience of plagiarism in a large Australian dental school to develop a response to an external audit report. Workshops designed to enhance participants' understanding of plagiarism and to assist with practical ways to promote academic integrity within the school were provided to all students and staff. Anonymous surveys were used to investigate perceptions and experience of plagiarism and to assess the usefulness of the workshops. Most participants felt that plagiarism was not a problem in the school, but a significant number were undecided. The majority of participants reported that the guidelines for dealing with plagiarism were inadequate and most supported the mandatory use of text-matching software in all courses. High proportions of participants indicated that the workshops were useful and that they would consider improving their practice as a result. The study provided data that enhanced understanding of aspects of plagiarism highlighted in the report at the school level and identified areas in need of attention, such as refining and raising awareness of the guidelines and incorporation of text-matching software into courses, as well as cautions to be considered (how text-matching software is used) in planning responsive action. © 2011 John Wiley & Sons A/S.

  18. Project margins of advanced reactor design WWER-500

    International Nuclear Information System (INIS)

    Rogov, M.F.; Birukov, G.I.; Ershov, V.G.; Volkov, B.E.

    1994-01-01

    Project criteria for design of advanced WWER-500 reactor within design conditions are compared to the requirements of the Russian regulatory guides. Normal operation limits, safe operation limits for main anticipated operational occurrences and design limits accepted for design basis accidents are considered as in preliminary safety report. It is shown that the basic design criteria in the design of WWER-500 for the anticipated operational occurrences and for design basis accidents are more severe than required in the following regulatory guides General Safety Regulations for Nuclear Power Plants and Nuclear Safety Rules for Reactors of Nuclear Power Plants. This provides certain margins from safety point of view

  19. Volunteered Geographic Information System Design: Project and Participation Guidelines

    Directory of Open Access Journals (Sweden)

    José-Pablo Gómez-Barrón

    2016-07-01

    Full Text Available This article sets forth the early phases of a methodological proposal for designing and developing Volunteered Geographic Information (VGI initiatives based on a system perspective analysis in which the components depend and interact dynamically among each other. First, it focuses on those characteristics of VGI projects that present different goals and modes of organization, while using a crowdsourcing strategy to manage participants and contributions. Next, a tool is developed in order to design the central crowdsourced processing unit that is best suited for a specific project definition, associating it with a trend towards crowd-based or community-driven approaches. The design is structured around the characterization of different ways of participating, and the task cognitive demand of working on geo-information management, spatial problem solving and ideation, or knowledge acquisition. Then, the crowdsourcing process design helps to identify what kind of participants are needed and outline subsequent engagement strategies. This is based on an analysis of differences among volunteers’ participatory behaviors and the associated set of factors motivating them to contribute, whether on a crowd or community-sourced basis. From a VGI system perspective, this paper presents a set of guidelines and methodological steps in order to align project goals, processes and volunteers and thus successfully attract participation. This methodology helps establish the initial requirements for a VGI system, and, in its current state, it mainly focuses on two components of the system: project and participants.

  20. Project Lifespan-based Nonstationary Hydrologic Design Methods for Changing Environment

    Science.gov (United States)

    Xiong, L.

    2017-12-01

    Under changing environment, we must associate design floods with the design life period of projects to ensure the hydrologic design is really relevant to the operation of the hydrologic projects, because the design value for a given exceedance probability over the project life period would be significantly different from that over other time periods of the same length due to the nonstationarity of probability distributions. Several hydrologic design methods that take the design life period of projects into account have been proposed in recent years, i.e. the expected number of exceedances (ENE), design life level (DLL), equivalent reliability (ER), and average design life level (ADLL). Among the four methods to be compared, both the ENE and ER methods are return period-based methods, while DLL and ADLL are risk/reliability- based methods which estimate design values for given probability values of risk or reliability. However, the four methods can be unified together under a general framework through a relationship transforming the so-called representative reliability (RRE) into the return period, i.e. m=1/1(1-RRE), in which we compute the return period m using the representative reliability RRE.The results of nonstationary design quantiles and associated confidence intervals calculated by ENE, ER and ADLL were very similar, since ENE or ER was a special case or had a similar expression form with respect to ADLL. In particular, the design quantiles calculated by ENE and ADLL were the same when return period was equal to the length of the design life. In addition, DLL can yield similar design values if the relationship between DLL and ER/ADLL return periods is considered. Furthermore, ENE, ER and ADLL had good adaptability to either an increasing or decreasing situation, yielding not too large or too small design quantiles. This is important for applications of nonstationary hydrologic design methods in actual practice because of the concern of choosing the emerging

  1. Directorate of Management - Special Staff - Joint Staff - Leadership - The

    Science.gov (United States)

    NGB Official March Today in Guard History Leadership CNGB VCNGB SEA DANG DARNG Joint Staff J-1 J-2 J-3 J-4 J-5 J-6 J-7 J-8 Personal Staff Inspector General Judge Advocate General Officer Management Public Affairs Executive Support Services Legislative Liaison Special Staff Directorate of Management

  2. Systematic Management of Change Is the Key to Successful Staff Development. An Initial Study of the Bloomfield Public Schools Staff Development Project. Teacher Essentials, Styles & Strategies (TESS).

    Science.gov (United States)

    Celso, Nicholas; Morris, Harold

    Confronted by a maturing staff, lower teacher turnover rates, declining enrollments, and more sophisticated instructional methods, the Bloomfield (New Jersey) Public School District adopted an ambitious staff development initiative in 1983. This paper describes the planning and implementation strategies used to launch Bloomfield's Teaching…

  3. Hospital accreditation: staff experiences and perceptions.

    Science.gov (United States)

    Bogh, Søren Bie; Blom, Ane; Raben, Ditte Caroline; Braithwaite, Jeffrey; Thude, Bettina; Hollnagel, Erik; Plessen, Christian von

    2018-06-11

    Purpose The purpose of this paper is to understand how staff at various levels perceive and understand hospital accreditation generally and in relation to quality improvement (QI) specifically. Design/methodology/approach In a newly accredited Danish hospital, the authors conducted semi-structured interviews to capture broad ranging experiences. Medical doctors, nurses, a quality coordinator and a quality department employee participated. Interviews were audio recorded and subjected to framework analysis. Findings Staff reported that The Danish Healthcare Quality Programme affected management priorities: office time and working on documentation, which reduced time with patients and on improvement activities. Organisational structures were improved during preparation for accreditation. Staff perceived that the hospital was better prepared for new QI initiatives after accreditation; staff found disease specific requirements unnecessary. Other areas benefited from accreditation. Interviewees expected that organisational changes, owing to accreditation, would be sustained and that the QI focus would continue. Practical implications Accreditation is a critical and complete hospital review, including areas that often are neglected. Accreditation dominates hospital agendas during preparation and surveyor visits, potentially reducing patient care and other QI initiatives. Improvements are less likely to occur in areas that other QI initiatives addressed. Yet, accreditation creates organisational foundations for future QI initiatives. Originality/value The authors study contributes new insights into how hospital staff at different organisational levels perceive and understand accreditation.

  4. The design explorer project: Using a cognitive framework to support knowledge exploration

    DEFF Research Database (Denmark)

    Pejtersen, A. M.; Sonnenwald, D.H.; Buur, J.

    1997-01-01

    the 'Design Explorer' research project whose goal is to specify requirements for an information system that will effectively help design team members from different domains and organizational cultures to locate and utilize diverse information sources and interact more effectively throughout the design process....... The project introduces a new approach to support of design; instead of design guidelines, support is given by creating a transparent information environment in which designers can navigate freely according to their individual preferences. The project is based on a framework that structures the dimensions......, and various related task spaces, domain activities, decisionmaking activities, division and coordination of work, and social organization. The framework is the result of a generalization of experiences from field studies in and design of support systems for a variety of modern work domains, such as process...

  5. Eco-design pilot project in China - Monsoon offer 2 upgrade

    Science.gov (United States)

    Thai, Roselyne; Liu, Guoguo

    2017-11-01

    During COP21, Schneider Electric has committed that 100% of our new products would be eco-designed to tackle climate change. Launched in 2015, this initiative ecoDesign WayTM was tested on some pilot projects. This project covers the first ecoDesign WayTM pilot in China on an overvoltage or under voltage protective device used in both residential and industrial sectors, called Monsoon. Under the name ecoDesign WayTM, a method and a process have been deployed. The 3 main ecoDesign WayTM phases are: phase 1 - Marketing & Technique handshake, Phase 2 - ecoDesign WayTM follow-up and Phase 3 - Marketing communication. During the project, EIME from Bureau Veritas CODDE and ecoDesign WayTM scorecard from EVEA consulting are two core tools for eco-design implementation. They are respectively used for life cycle assessment and eco-design performance comparison. Thanks to the approach, compared to previous range, pollution emissions and resource depletion along the whole life cycle of product have decreased (reduction of 55% for energy depletion and 85% for water depletion). Global warming potential has dramatically decreased by 98.4% and air pollution by 33%. Meanwhile, the recycling rate has been improved by 18%, and recycled PA is used. The ecoDesign WayTM scorecard is stored as referent document for any customer request. Moreover, customers can access RoHS certificate, REACh declaration, PEP and EoLI in Check a product, an online environmental data repository, available 24/7.

  6. Design Fixation and Cooperative Learning in Elementary Engineering Design Project: A Case Study

    Science.gov (United States)

    Luo, Yi

    2015-01-01

    This paper presents a case study examining 3rd, 4th and 5th graders' design fixation and cooperative learning in an engineering design project. A mixed methods instrument, the Cooperative Learning Observation Protocol (CLOP), was adapted to record frequency and class observation on cooperative learning engagement through detailed field notes.…

  7. Joint Chiefs of Staff > About > The Joint Staff > Senior Enlisted Advisor

    Science.gov (United States)

    Skip to main content (Press Enter). Toggle navigation Joint Chiefs of Staff Joint Chiefs of Staff Joint Chiefs of Staff Facebook Twitter YouTube Flickr Blog Instagram Search JCS: Search Search Search JCS: Search Home Media News Photos Videos Publications About The Joint Staff Chairman Vice Chairman

  8. Mental Health staff views on improving burnout and mental toughness

    OpenAIRE

    Posner, Zoe; Janssen, Jessica; Roddam, Hazel

    2017-01-01

    Purpose- Burnout in mental health staff is acknowledged as a major problem. The purpose of this paper is to gain an understanding of mental health staff views on improving burnout and mental toughness in mental health staff.\\ud Design/methodology/approach-Ten participants from two mental health rehabilitation units across the North West of England took part in a Nominal Group Technique (NGT). Participants consisted of mental health workers from varied roles in order to\\ud capture views from a...

  9. The impact of staff and service user gender on staff responses towards adults with intellectual disabilities who display aggressive behaviour.

    Science.gov (United States)

    Kleinberg, I; Scior, K

    2014-02-01

    The impact of staff and service user gender on responses of staff in intellectual disability (ID) services is poorly understood. The present study set out to assess the role of gender in influencing staff emotions, attributions and behavioural intentions in response to aggression displayed by adults with ID. A new scale measuring staff behavioural intentions was developed. A two × two (staff gender × service user gender) between subjects design was used to compare the responses of day and residential support staff to physical aggression by a hypothetical service user. In response to a vignette depicting a service user with ID assaulting a member of staff, 160 respondents completed measures of affective responses, causal attributions and behavioural intentions while imagining themselves as the target of the service user's assault. Female participants reported feeling more fear/anxiety, more depression/anger and less confident/relaxed than male participants. The longer staff had worked with people with ID, the more likely they were to favour safety-focused behaviours. More confident female participants were less likely to favour safety-focused behaviours, but confidence had no effect on male participants' endorsement of these behaviours. Increased confidence in both was associated with lower agreement of safety-focused behaviours in relation to the female vignette, regardless of participant gender. The more control women believed the service user had over their behaviour, the more likely they were to choose safety-focused behaviours. Punitive behaviours were favoured more in response to the male rather than the female service user. Punitive behaviours were also favoured more by more junior staff and by participants who expected feeling more depressed/angry in response to the vignettes. Both staff and service user gender influenced staff responses to aggression, yet the latter played a smaller role than expected. The role of gender in staff-service user

  10. Developing Mobile Clinical Decision Support for Nursing Home Staff Assessment of Urinary Tract Infection using Goal-Directed Design.

    Science.gov (United States)

    Jones, Wallace; Drake, Cynthia; Mack, David; Reeder, Blaine; Trautner, Barbara; Wald, Heidi

    2017-06-20

    Unique characteristics of nursing homes (NHs) contribute to high rates of inappropriate antibiotic use for asymptomatic bacteriuria (ASB), a benign condition. A mobile clinical decision support system (CDSS) may support NH staff in differentiating urinary tract infections (UTI) from ASB and reducing antibiotic days. We used Goal-Directed Design to: 1) Characterize information needs for UTI identification and management in NHs; 2) Develop UTI Decide, a mobile CDSS prototype informed by personas and scenarios of use constructed from Aim 1 findings; 3) Evaluate the UTI Decide prototype with NH staff. Focus groups were conducted with providers and nurses in NHs in Denver, Colorado (n= 24). Qualitative descriptive analysis was applied to focus group transcripts to identify information needs and themes related to mobile clinical decision support for UTI identification and management. Personas representing typical end users were developed; typical clinical context scenarios were constructed using information needs as goals. Usability testing was performed using cognitive walk-throughs and a think-aloud protocol. Four information needs were identified including guidance regarding resident assessment; communication with providers; care planning; and urine culture interpretation. Design of a web-based application incorporating a published decision support algorithm for evidence-based UTI diagnoses proceeded with a focus on nursing information needs during resident assessment and communication with providers. Certified nursing assistant (CNA) and registered nurse (RN) personas were constructed in 4 context scenarios with associated key path scenarios. After field testing, a high fidelity prototype of UTI Decide was completed and evaluated by potential end users. Design recommendations and content recommendations were elicited. Goal-Directed Design informed the development of a mobile CDSS supporting participant-identified information needs for UTI assessment and communication

  11. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-09

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab.

  12. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab

  13. The latest on the recent HR staff survey

    CERN Multimedia

    2009-01-01

    The data collected in the framework of the staff survey sent out by the Human Resources (HR) Department in March this year are currently being analysed. The first results concern the response rate and the breakdown of participants. 1328 staff members replied to the questionnaire, representing a response rate of close to 60%. Marie-Luce Falipou, who is in charge of the project within the HR Department, is evidently satisfied with the result: "The high response rate shows that the staff appreciated HR’s efforts to sound out their opinions and felt concerned by the subjects covered in the questionnaire". All the data are now being processed by the team led by Philippe Sarnin, Director of the Social Psychology Department at the University of Lyon2. "The number of responses submitted during the 15 days the form was available on line was very satisfactory. This is a vital factor in ensuring that we are able to build up an accurate pictu...

  14. A biotic game design project for integrated life science and engineering education.

    Science.gov (United States)

    Cira, Nate J; Chung, Alice M; Denisin, Aleksandra K; Rensi, Stefano; Sanchez, Gabriel N; Quake, Stephen R; Riedel-Kruse, Ingmar H

    2015-03-01

    Engaging, hands-on design experiences are key for formal and informal Science, Technology, Engineering, and Mathematics (STEM) education. Robotic and video game design challenges have been particularly effective in stimulating student interest, but equivalent experiences for the life sciences are not as developed. Here we present the concept of a "biotic game design project" to motivate student learning at the interface of life sciences and device engineering (as part of a cornerstone bioengineering devices course). We provide all course material and also present efforts in adapting the project's complexity to serve other time frames, age groups, learning focuses, and budgets. Students self-reported that they found the biotic game project fun and motivating, resulting in increased effort. Hence this type of design project could generate excitement and educational impact similar to robotics and video games.

  15. Conflict between nursing home staff and residents' families: does it increase burnout?

    Science.gov (United States)

    Abrahamson, Kathleen; Jill Suitor, J; Pillemer, Karl

    2009-09-01

    In this study, the authors examine the influence of conflict between nursing home staff and family members of residents on staff burnout. Data were collected from interviews with a representative sample of 655 nursing home nurses and nursing assistants. Hypotheses were tested using structural equation modeling. Results indicate that conflict with family members increases staff burnout and decreases staff satisfaction. Staff and family conflict increases when staff members feel they do not have enough time to complete required tasks. Level of conflict decreases when staff perceive that family members have care expectations that are similar to their own. Interestingly, staff who have personal experience as family caregivers are more likely to report conflict with family members of residents, a result that necessitates further study. Staff burnout and dissatisfaction affects both individuals and organizations. Policy that addresses staff and family interaction can have an important place in the design and delivery of long-term care.

  16. CLIC project R&D studies: the magnet system for the 3 TEV

    CERN Document Server

    Modena, Michele

    2017-01-01

    This Note presents the R&D activities done and coordinated by TE-MSC Group on the magnetic system for the CLIC (Compact Linear Collider) project. The main aspects investigated are: the magnetic system definition, basic design for all magnets (i.e. a CLIC Magnet Catalogue), powering and cost evaluation, advanced design and prototyping for the most critical magnet variants. The CLIC layout here considered is the one for the highest collision energy of 3 TeV. This layout was the one studied in detail as baseline for the CLIC Conceptual Design Report that was released in 2012. This Note summarize the activities of about 6 years (2010-2016) done with the contribution of CERN staff (part-time), the contribution of some CERN Project Associates sponsored by the CLIC Project and in collaboration with STCF Daresbury Laboratory (UK).

  17. Innovative public library services - staff-less or staff-intensive?

    DEFF Research Database (Denmark)

    Johannsen, Carl Gustav Viggo

    2014-01-01

    Purpose – Several recent library innovations seem to make professional and clerical staff superfluous such as automated loan and delivery equipment, staff-less libraries open in 80 hours a week, and virtual services, enabling users to search the library catalogue and make reservations of library...... materials from their home address. The purpose of this paper is to examine whether such developments will necessarily lead to a situation where public libraries become self-service institutions or to what extent self-service and innovative staff-intensive library services can develop and co......-exist. Furthermore, the paper will examine what challenges library leaders face and what they can do, and actually have done, to handle staff resistance and other related problems to the benefit of both the users, the local communities, and also, the staff, in particular, when introducing new and innovative services...

  18. Fuel Cell Car Design Project for Freshman Engineering Courses

    Science.gov (United States)

    Duke, Steve R.; Davis, Virginia A.

    2014-01-01

    In the Samuel Ginn College of Engineering at Auburn University, we have integrated a semester long design project based on a toy fuel cell car into our freshman "Introduction to Chemical Engineering Class." The project provides the students a basic foundation in chemical reactions, energy, and dimensional analysis that facilitates…

  19. Designing and Conducting Health Systems Research Projects ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Home · Resources · Publications. Designing and Conducting Health Systems Research Projects Volume 1: Proposal Development and Fieldwork ... IDRC and the United Kingdom's Global AMR Innovation Fund—managed by the ... New website will help record vital life events to improve access to services for all.

  20. AECB staff review of Bruce NGS'A' operation for the year 1987

    International Nuclear Information System (INIS)

    1988-06-01

    This report presents AECB project staff's review of major licensing issues and of the operational performance of the station during 1987. Ontario Hydro reports and official correspondence and observations on AECB staff at site have been taken into consideration. The report is limited to aspects of the station performance that AECB staff considers to have a safety significance. Where significant developments associated with issues addressed in the report occurred in the early part of 1988 (up to the time of writing), these are mentioned where appropriate. Ontario Hydro's Quarterly Reports for 1987 contain detailed technical information on the performance of the station, individual units and unit systems. It is the opinion of AECB project staff that despite a number of commendable actions and achievements which are identified in this report, the performance of the station in 1987 was only marginally satisfactory and less satisfactory than in 1986. This assessment is supported by key performance indicators such as the number of reportable significant events, the number of events caused by or influenced by human error and the reactor trip frequency, all of which exceeded 1986 levels, and also by the lack of satisfactory progress made during the year on actions to address the findings of the Fall '86 AECB Assessment of Operating Practices. AECB staff considers that the outstanding operations and maintenance problems that were identified in the 1986 Assessment are due, in part, to an ineffective quality assurance program, and in part to a shortage of resources

  1. Designing the owner's nuclear project management organization

    International Nuclear Information System (INIS)

    Cooke, T.C.; Peck, B.H.

    1976-01-01

    Few decisions are more important to an electric utility company than the one to build a nuclear generating facility. This decision will require continuous management attention to the nuclear project for periods of up to ten years on the part of the utility. Effective management of such a large, complex project requires an owner's organization skilled in such areas as engineering, heavy construction, procurement, and project control. The paper describes a method for designing the owner's nuclear organization. Factors considered include the identification of milestone events and phases of the project and identification of key organizational groups and their degree of involvement. A series of important decision milestones is also identified for structuring the organization. A step-by-step analysis involving a set of evaluation criteria results in a recommended organization that can be staffed by the owner according to the degree of involvement desired. This technique of analysis could also be performed using different evaluation criteria resulting in other options for the owner's organization

  2. Staff development strategies for school library media centres: a case ...

    African Journals Online (AJOL)

    Staff development is a sine-qua non to the provision of efficient library services at any level. The study sets to investigate staff development strategies in school libraries and Information centres in Owerri, Imo State Nigeria. Self-designed questionnaires were used in eliciting data for the study. Ten schools were used with 10 ...

  3. Identification of Tools and Techniques to Enhance Interdisciplinary Collaboration During Design and Construction Projects.

    Science.gov (United States)

    Keys, Yolanda; Silverman, Susan R; Evans, Jennie

    2017-10-01

    The purpose of this study was to collect the perceptions of design professionals and clinicians regarding design process success strategies and elements of interprofessional engagement and communication during healthcare design and construction projects. Additional objectives were to gather best practices to maximize clinician engagement and provide tools and techniques to improve interdisciplinary collaboration for future projects. Strategies are needed to enhance the design and construction process and create interactions that benefit not only the project but the individuals working to see its completion. Meaningful interprofessional collaboration is essential to any healthcare design project and making sure the various players communicate is a critical element. This was a qualitative study conducted via an online survey. Respondents included architects, construction managers, interior designers, and healthcare personnel who had recently been involved in a building renovation or new construction project for a healthcare facility. Responses to open-ended questions were analyzed for themes, and descriptive statistics were used to provide insight into participant demographics. Information on the impressions, perceptions, and opportunities related to clinician involvement in design projects was collected from nurses, architects, interior designers, and construction managers. Qualitative analysis revealed themes of clinician input, organizational dynamics, and a variety of communication strategies to be the most frequently mentioned elements of successful interprofessional collaboration. This study validates the need to include clinician input in the design process, to consider the importance of organizational dynamics on design team functioning, and to incorporate effective communication strategies during design and construction projects.

  4. Competencies for Teachers of Learners Who Are Deafblind: Perkins National Deafblind Training Project.

    Science.gov (United States)

    McLetchie, Barbara A. B.; Riggio, Marianne

    The statements of knowledge and skills contained in this manual are the outcome of a collaborative process involving a committee that included the project staff, university level faculty, and a state coordinator of deaf-blind services. The competencies are designed for use as a blueprint for course development and field experiences by university…

  5. Project W-420 Stack Monitoring system upgrades conceptual design report

    International Nuclear Information System (INIS)

    TUCK, J.A.

    1998-01-01

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks

  6. Project W-420 Stack Monitoring system upgrades conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    TUCK, J.A.

    1998-11-06

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks.

  7. A biotic game design project for integrated life science and engineering education.

    Directory of Open Access Journals (Sweden)

    Nate J Cira

    2015-03-01

    Full Text Available Engaging, hands-on design experiences are key for formal and informal Science, Technology, Engineering, and Mathematics (STEM education. Robotic and video game design challenges have been particularly effective in stimulating student interest, but equivalent experiences for the life sciences are not as developed. Here we present the concept of a "biotic game design project" to motivate student learning at the interface of life sciences and device engineering (as part of a cornerstone bioengineering devices course. We provide all course material and also present efforts in adapting the project's complexity to serve other time frames, age groups, learning focuses, and budgets. Students self-reported that they found the biotic game project fun and motivating, resulting in increased effort. Hence this type of design project could generate excitement and educational impact similar to robotics and video games.

  8. Project Portal User-Centered Design and Engineering Report

    Science.gov (United States)

    2016-06-01

    TECHNICAL REPORT 3013 June 2016 Project Portal User-Centered Design and Engineering Report Deborah Gill-Hesselgrave Veronica Higgins Sarah...Design and Engineering Branch Under authority of Chris Raney, Head Command and Control Technology and Experiments Division iii EXECUTIVE...navy.mil  Christian Szatkowski christian.szatkowski@navy.mil  Roni Higgins roni.higgins@navy.mil  Jake Viraldo jacob.viraldo@navy.mil B

  9. SYSTEM OF COMPLEX EVALUATION OF ADMINISTRATIVE STAFF IN THE UNIVERSITY: PRACTICE AND FEATURES

    Directory of Open Access Journals (Sweden)

    E. V. Myalkina

    2018-01-01

    Full Text Available Introduction: the problem of assessing the administrative staff of an educational organization of higher education is becoming increasingly important, as the competence, effectiveness and loyalty of staff is becoming an increasingly important factor and competitive advantage in the face of financial and resource constraints in the activities of universities. Traditional approaches to assessing the performance of employees give way to individual accounting of achievements and flexible regulation of material incentives for each employee.Materials and Methods: the article summarizes the experience and methods of personnel assessment as a key factor in the implementation of personnel policy and optimization of the personnel management system; the review of already applied methods of an estimation of scientific and pedagogical workers of high school is presented; a description of the methodology for a comprehensive assessment of the effectiveness of the administrative and management staff of the university, based on performance indicators and job descriptions, as well as performance and effectiveness indicators (KPI.Results:  the article presents the results obtained in the implementation of the pilot project for the comprehensive assessment of the administrative staff of the Minin University, a system for assessing administrative personnel is described, taking into account the quality of the execution of job descriptions and the performance indicators of each employee. Based on the evaluations of employees, an assessment of the structural units was carried out.Discussion and Conclusions: based on the results of the pilot project, a set of methods for assessing personnel in the personnel work system of the university is proposed, which ensures the quality, efficiency, loyalty and systematic individual development of the university staff. The assessment of the administrative and managerial staff allows us to conclude that this methodology can be used

  10. Project FIT: Rationale, design and baseline characteristics of a school- and community-based intervention to address physical activity and healthy eating among low-income elementary school children

    Directory of Open Access Journals (Sweden)

    Oh Hyun J

    2011-07-01

    Full Text Available Abstract Background This paper describes Project FIT, a collaboration between the public school system, local health systems, physicians, neighborhood associations, businesses, faith-based leaders, community agencies and university researchers to develop a multi-faceted approach to promote physical activity and healthy eating toward the general goal of preventing and reducing childhood obesity among children in Grand Rapids, MI, USA. Methods/design There are four overall components to Project FIT: school, community, social marketing, and school staff wellness - all that focus on: 1 increasing access to safe and affordable physical activity and nutrition education opportunities in the schools and surrounding neighborhoods; 2 improving the affordability and availability of nutritious food in the neighborhoods surrounding the schools; 3 improving the knowledge, self-efficacy, attitudes and behaviors regarding nutrition and physical activity among school staff, parents and students; 4 impacting the 'culture' of the schools and neighborhoods to incorporate healthful values; and 5 encouraging dialogue among all community partners to leverage existing programs and introduce new ones. Discussion At baseline, there was generally low physical activity (70% do not meet recommendation of 60 minutes per day, excessive screen time (75% do not meet recommendation of rd-5th grade children (n = 403. Trial registration ClinicalTrials.gov NCT01385046

  11. Using design science in educational technology research projects

    Directory of Open Access Journals (Sweden)

    Susan M. Chard

    2017-12-01

    Full Text Available Design science is a research paradigm where the development and evaluation of a technology artefact is a key contribution. Design science is used in many domains and this paper draws on those domains to formulate a generic structure for design science research suitable for educational technology research projects. The paper includes guidelines for writing proposals using the design science research methodology for educational technology research and presents a generic research report structure. The paper presents ethical issues to consider in design science research being conducted in educational settings and contributes guidelines for assessment when the research contribution involves the creation of a technology artefact.

  12. Validation of a patient-centered culturally sensitive health care office staff inventory.

    Science.gov (United States)

    Tucker, Carolyn M; Wall, Whitney; Marsiske, Michael; Nghiem, Khanh; Roncoroni, Julia

    2015-09-01

    Research suggests that patient-perceived culturally sensitive health care encompasses multiple components of the health care delivery system including the cultural sensitivity of front desk office staff. Despite this, research on culturally sensitive health care focuses almost exclusively on provider behaviors, attitudes, and knowledge. This is due in part to the paucity of instruments available to assess the cultural sensitivity of front desk office staff. Thus, the objective of the present study is to determine the psychometric properties of the pilot Tucker-Culturally Sensitive Health Care Office Staff Inventory-Patient Form (T-CSHCOSI-PF), which is an instrument designed to enable patients to evaluate the patient-defined cultural sensitivity of their front desk office staff. A sample of 1648 adult patients was recruited by staff at 67 health care sites across the United States. These patients anonymously completed the T-CSHCOSI-PF, a demographic data questionnaire, and a patient satisfaction questionnaire. Findings Confirmatory factor analyses of the TCSHCOSI-PF revealed that this inventory has two factors with high internal consistency reliability and validity (Cronbach's αs=0.97 and 0.95). It is concluded that the T-CSHCOSI-PF is a psychometrically strong and useful inventory for assessing the cultural sensitivity of front desk office staff. This inventory can be used to support culturally sensitive health care research, evaluate the job performance of front desk office staff, and aid in the development of trainings designed to improve the cultural sensitivity of these office staff.

  13. Spacecraft design project: Low Earth orbit communications satellite

    Science.gov (United States)

    Moroney, Dave; Lashbrook, Dave; Mckibben, Barry; Gardener, Nigel; Rivers, Thane; Nottingham, Greg; Golden, Bill; Barfield, Bill; Bruening, Joe; Wood, Dave

    1991-01-01

    This is the final product of the spacecraft design project completed to fulfill the academic requirements of the Spacecraft Design and Integration 2 course (AE-4871) taught at the U.S. Naval Postgraduate School. The Spacecraft Design and Integration 2 course is intended to provide students detailed design experience in selection and design of both satellite system and subsystem components, and their location and integration into a final spacecraft configuration. The design team pursued a design to support a Low Earth Orbiting (LEO) communications system (GLOBALSTAR) currently under development by the Loral Cellular Systems Corporation. Each of the 14 team members was assigned both primary and secondary duties in program management or system design. Hardware selection, spacecraft component design, analysis, and integration were accomplished within the constraints imposed by the 11 week academic schedule and the available design facilities.

  14. Environmental Performance Information Use by Conservation Agency Staff

    Science.gov (United States)

    Wardropper, Chloe Bradley

    2018-04-01

    Performance-based conservation has long been recognized as crucial to improving program effectiveness, particularly when environmental conditions are dynamic. Yet few studies have investigated the use of environmental performance information by staff of conservation organizations. This article identifies attitudinal, policy and organizational factors influencing the use of a type of performance information—water quality information—by Soil and Water Conservation District staff in the Upper Mississippi River Basin region. An online survey ( n = 277) revealed a number of important variables associated with greater information use. Variables included employees' prosocial motivation, or the belief that they helped people and natural resources through their job, the perceived trustworthiness of data, the presence of a U.S. Clean Water Act Total Maximum Daily Load standard designation, and staff discretion to prioritize programs locally. Conservation programs that retain motivated staff and provide them the resources and flexibility to plan and evaluate their work with environmental data may increase conservation effectiveness under changing conditions.

  15. Pedagogical design for knowledge creating inquiry in customer projects

    Directory of Open Access Journals (Sweden)

    Hanni Muukkonen

    2013-09-01

    Full Text Available Two higher education courses involving students, teachers, and customers in multifaceted experiences of knowledge creation are described. The Trialogical Learning Approach (TLA provides a theoretical framework to address learning and teaching organized around authentic problems and the development of shared knowledge objects, such as reports, products, and new practices. The approach directs attention to those aspects of social interaction and artifact-mediated activities, which focus on the development of shared objects and the pursuit of novel knowledge and understanding. The roles of technology-mediation, customer involvement, and guidance in developing effective pedagogical practices for knowledge creation were addressed. It appears necessary to design sufficient open-endedness and complexity for students’ teamwork to generate unpredictable, practical, and epistemologically challenging situations. Pedagogical design for such a process has different foci in the four central phases: planning, project initiation, project execution, and presentation and evaluation. Planning and initiation are central to establishing relevance and project awareness for the collaboration of student teams with a customer. Guidance and expert modeling during project initiation and execution is needed to overcome feelings of uncertainty during a challenging and complex assignment. Mediation provided by collaboration tools facilitates reflection on collective practices, iterative development of knowledge objects, and documentation of the learning outcomes of customer projects.

  16. Role of participants in nuclear power projects

    International Nuclear Information System (INIS)

    Polliart, A.J.

    1977-01-01

    In this article staffing requirements for nuclear projects (Turnkey Contract) and the owner's staff requirements, project planning, project implementation, and plant construction and commissioning are treated. (HK) [de

  17. Manufacturing and Design Engineering Students St. Mary's Hospital, Phoenix Park.

    OpenAIRE

    Mitchell, Leah

    2012-01-01

    Poster with details of project to improve ease of movement for Kirton Stirling chairs in St. Mary's Hospital, Phoenix Park, Dublin. Third year students in the B Eng (Honours) Manufacturing and Design Engineering course at Bolton St. completed a project in conjunction with St. Mary‟s Hospital, Phoenix Park. The staff in St Mary‟s were experiencing difficulty in moving the Kirton Stirling chairs (pictured above). These chairs are used to transport elderly patients from one location to another. ...

  18. A New Project-Based Curriculum of Design Thinking with Systems Engineering Techniques

    NARCIS (Netherlands)

    Haruyama, S.; Kim, S.K.; Beiter, K.A.; Dijkema, G.P.J.; De Weck, O.L.

    2012-01-01

    We developed a new education curriculum called "ALPS" (Active Learning Project Sequence) at Keio University that emphasizes team project-based learning and design thinking with systems engineering techniques. ALPS is a 6 month course, in which students work as a team and design and propose

  19. Final Design Report for the RH LLW Disposal Facility (RDF) Project, Revision 3

    International Nuclear Information System (INIS)

    Austad, Stephanie Lee

    2015-01-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  20. Optical design of ultrashort throw liquid crystal on silicon projection system

    Science.gov (United States)

    Huang, Jiun-Woei

    2017-05-01

    An ultrashort throw liquid crystal on silicon (LCoS) projector for home cinema, virtual reality, and automobile heads-up display has been designed and fabricated. To achieve the best performance and highest-quality image, this study aimed to design wide-angle projection optics and optimize the illumination for LCoS. Based on the telecentric lens projection system and optimized Koehler illumination, the optical parameters were calculated. The projector's optical system consisted of a conic aspheric mirror and image optics using either symmetric double Gauss or a large-angle eyepiece to achieve a full projection angle larger than 155 deg. By applying Koehler illumination, image resolution was enhanced and the modulation transfer function of the image in high spatial frequency was increased to form a high-quality illuminated image. The partial coherence analysis verified that the design was capable of 2.5 lps/mm within a 2 m×1.5 m projected image. The throw ratio was less than 0.25 in HD format.

  1. User-inspired design methodology using Affordance Structure Matrix (ASM for construction projects

    Directory of Open Access Journals (Sweden)

    Maheswari J. Uma

    2017-01-01

    Full Text Available Traditionally, design phase of construction projects is often performed with incomplete and inaccurate user preferences. This is due to inefficiencies in the methodologies used for capturing the user requirements that can subsequently lead to inconsistencies and result in non-optimised end-result. Iterations and subsequent reworks due to such design inefficiencies is one of the major reasons for unsuccessful project delivery as they impact project performance measures such as time and cost among others. The existing design theories and practice are primarily based on functional requirements. Function-based design deals with design of artifact alone, which may yield favourable or unfavourable consequences with the design artifact. However, incorporating other interactions such as interactions between user & designer is necessary for optimised end-result. Hence, the objective of this research work is to devise a systematic design methodology considering all the three interactions among users, designers and artefacts for improved design efficiency. In this study, it has been attempted to apply the theory of affordances in a case project that involves the design of an offshore facility. A step-by-step methodology for developing Affordance Structure Matrix (ASM, which integrates House of Quality (HOQ and Design Structure Matrix (DSM, is proposed that can effectively capture the user requirements. HOQ is a popular quality management tool for capturing client requirements and DSM is a matrix-based tool that can capture the interdependency among the design entities. The proposed methodology utilises the strengths of both the tools, as DSM compliments HOQ in the process. In this methodology, different affordances such as AUA (Artifact-User-Affordance, AAA (Artifact-Artifact-Affordance and DDA (Designer-Designer-Affordance are captured systematically. Affordance is considered to be user-driven in this context that is in contrast to prevailing design

  2. Designing a mobile augmented reality tool for the locative visualisation of biomedical knowledge.

    Science.gov (United States)

    Kilby, Jess; Gray, Kathleen; Elliott, Kristine; Waycott, Jenny; Sanchez, Fernando Martin; Dave, Bharat

    2013-01-01

    Mobile augmented reality (MAR) may offer new and engaging ways to support consumer participation in health. We report on design-based research into a MAR application for smartphones and tablets, intended to improve public engagement with biomedical research in a specific urban precinct. Following a review of technical capabilities and organizational and locative design considerations, we worked with staff of four research institutes to elicit their ideas about information and interaction functionalities of a shared MAR app. The results were promising, supporting the development of a prototype and initial field testing with these staff. Evidence from this project may point the way toward user-centred design of MAR services that will enable more widespread adoption of the technology in other healthcare and biomedical research contexts.

  3. Design Factors Influencing Quality of Building Projects in Nigeria: Consultants' Perception

    Directory of Open Access Journals (Sweden)

    Lukumon Oyedele

    2012-11-01

    Full Text Available Various factors identified from the literature that caninfluence quality of building projects in Nigeria have beenstudied by means of questionnaire survey sent to architects,engineers and quantity surveyors in the industry. From atotal response of 107 consultants, the importance of eachfactor was obtained via severity and frequency responsesof the factors. Data analysis includes comparisons ofranking among consultants using severity, frequency andimportance indexes, correlation analysis, and percentagerank agreement factor (PRAF to measure the agreement inthe importance ranking among the consultants.Correlation results between the professionals are architects/quantity surveyors (0.75, architects/engineers (0.21 ,and engineers/quantity surveyors (0.24. The percentagerank agreement factor (PRAF shows that the five mostimportant factors affecting quality are 'design changes'(78.9%; 'inadequate involvement of other professionalsduring the design stage' (78.9%; 'insufficient andunrealistic constraints of project cost' (71.1 %; 'poor levelof commitment to quality improvement among designprofessionals' (63.2%; and 'making design decisions oncost and not value of work' (55.3%. The results of this studywould provide feedback for the clients, project and qualitymangers and all the consultants in the industry, so thateffective management of quality can be ensured from theconceptual-design stage of the project.

  4. AECB staff annual report of Bruce NGS 'B' for the year 1988

    International Nuclear Information System (INIS)

    1989-05-01

    The operation of the Bruce 'B' Nuclear Generating Station is monitored and licensing requirements are enforced by the Atomic Energy Control Board (AECB) Bruce project staff, with appropriate support from other AECB personnel. The staff observes operation of the reactors, conducts audits, witnesses important activities, reviews station documentation and reports, and issues approvals where appropriate in accordance with license conditions. As required by a condition of its Operating Licence, Ontario Hydro each year submits Technical Reports which summarize various aspects of the operation of Bruce NGS 'B' during the year. When these reports have been reviewed by AECB staff, a formal Annual Review Meeting is held with the station management to discuss safety-related aspects of the station operation, and to inform Ontario Hydro of AECB staff conclusions with respect to the performance of Ontario Hydro in operating the station during the year

  5. A planning and scheduling system for the LHC project

    CERN Document Server

    Bachy, Gérard; Tarrant, M

    1995-01-01

    The purpose of this paper is to present modern ways to manage time, resources and progress in a large-scale project. Over the last ten years, new project management techniques and tools have appeared such as concurrent engineering, Continuous Acquisition Lifecycle Support (CALS) and Engineering Data Management System (EDMS). The world downturn of the early 90s influenced project management: increasing constraints on time and budget and more external direction on spending that, for example, requires sophisticated sub-contracting practises. However, the evolution of the software and hardware market makes project control tools cheaper and easier to use. All project groups want to have their scope of work considered as complete projects and to control them themselves. This has several consequences on project staff behaviour concerning project control, and has to be taken into account in every planning process designed today. The system described will be at the heart of the planning and scheduling procedures issue...

  6. Design of the DIRECT-project: interventions to increase job resources and recovery opportunities to improve job-related health, well-being, and performance outcomes in nursing homes

    Directory of Open Access Journals (Sweden)

    Hamers Jan PH

    2010-05-01

    Full Text Available Abstract Background Because of high demands at work, nurses are at high risk for occupational burnout and physical complaints. The presence of job resources (such as job autonomy or social support and recovery opportunities could counteract the adverse effect of high job demands. However, it is still unclear how job resources and recovery opportunities can be translated into effective workplace interventions aiming to improve employee health, well-being, and performance-related outcomes. The aim of the current research project is developing and implementing interventions to optimize job resources and recovery opportunities, which may lead to improved health, well-being and performance of nurses. Methods/design The DIRECT-project (DIsc Risk Evaluating Controlled Trial is a longitudinal, quasi-experimental field study. Nursing home staff of 4 intervention wards and 4 comparison wards will be involved. Based on the results of a base-line survey, interventions will be implemented to optimize job resources and recovery opportunities. After 12 and 24 month the effect of the interventions will be investigated with follow-up surveys. Additionally, a process evaluation will be conducted to map factors that either stimulated or hindered successful implementation as well as the effectiveness of the interventions. Discussion The DIRECT-project fulfils a strong need for intervention research in the field of work, stress, performance, and health. The results could reveal (1 how interventions can be tailored to optimize job resources and recovery opportunities, in order to counteract job demands, and (2 what the effects of these interventions will be on health, well-being, and performance of nursing staff.

  7. Development and Evaluation of a Train-the-Trainer Workshop for Hong Kong Community Social Service Agency Staff.

    Science.gov (United States)

    Zhou, Qianling; Stewart, Sunita M; Wan, Alice; Leung, Charles Sai-Cheong; Lai, Agnes Y; Lam, Tai Hing; Chan, Sophia Siu-Chee

    2017-01-01

    Capacity building approaches are useful in large-scale community-based health promotion interventions. However, models to guide and evaluate capacity building among social service agency staff in community settings are rare in the literature. This paper describes the development and evaluation of a 1-day (7 h) train-the-trainer (TTT) workshop for the "Enhancing Family Well-Being Project". The workshop aimed at equipping staff from different community agencies with the knowledge and skills to design, implement, and evaluate positive psychology-based interventions for their clients in Sham Shui Po, an over-crowded and low-income district in Hong Kong. The current TTT extended and improved on our previous successful model by adding research and evaluation methods (including the Logic Model, process evaluation, and randomized controlled trial), which are important to plan and evaluate the community interventions. Evaluation of the TTT was guided by the Integrated Model of Training Evaluation and Effectiveness (IMTEE), with quantitative and qualitative methods. Quantitative data were collected from pretraining (T1), post-training (T2), and 6-month (T3) and 12-month (T4) follow-up surveys. Qualitative data were collected from four focus groups of agency staff after the intervention. Ninety-three staff from 30 community agencies attended the training, and 90 completed the baseline survey. Eighty-eight, 63, and 57 staff performed the evaluations at T2, T3, and T4, respectively. Agency staff were satisfied with the TTT. Immediate enhancement of knowledge, self-efficacy, and positive attitudes toward the training content was found at T2 (Cohen's d ranged from 0.24 to 1.22, all p  agency staff, and delivered to 1,586 participants. The agency staff indicated their intention to utilize the skills they had learned for other interventions (score ≥4 out of 6) and to share these skills with their colleagues. Qualitative feedbacks from 23 agency staff supported the

  8. NRC review of Electric Power Research Institute's advanced light water reactor utility requirements document. Passive plant designs, chapter 1, project number 669

    International Nuclear Information System (INIS)

    1994-08-01

    The Electric Power Research Institute (EPRI) is preparing a compendium of technical requirements, referred to as the open-quotes Advanced Light Water Reactor [ALWR] Utility Requirements Documentclose quotes, that is acceptable to the design of an ALWR power plant. When completed, this document is intended to be a comprehensive statement of utility requirements for the design, construction, and performance of an ALWR power plant for the 1990s and beyond. The Requirements Document consists of three volumes. Volume 1, open-quotes ALWR Policy and Summary of Top-Tier Requirementsclose quotes, is a management-level synopsis of the Requirements Document, including the design objectives and philosophy, the overall physical configuration and features of a future nuclear plant design, and the steps necessary to take the proposed ALWR design criteria beyond the conceptual design state to a completed, functioning power plant. Volume II consists of 13 chapters and contains utility design requirements for an evolutionary nuclear power plant [approximately 1350 megawatts-electric (MWe)]. Volume III contains utility design requirements for nuclear plants for which passive features will be used in their designs (approximately 600 MWe). In April 1992, the staff of the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, issued Volume 1 and Volume 2 (Parts 1 and 2) of its safety evaluation report (SER) to document the results of its review of Volumes 1 and 2 of the Requirements Document. Volume 1, open-quotes NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document - Program Summaryclose quotes, provided a discussion of the overall purpose and scope of the Requirements Document, the background of the staff's review, the review approach used by the staff, and a summary of the policy and technical issues raised by the staff during its review

  9. User-inspired design methodology using Affordance Structure Matrix (ASM) for construction projects

    OpenAIRE

    Maheswari J. Uma; Charlesraj V. Paul C.; Battacharya Soma

    2017-01-01

    Traditionally, design phase of construction projects is often performed with incomplete and inaccurate user preferences. This is due to inefficiencies in the methodologies used for capturing the user requirements that can subsequently lead to inconsistencies and result in non-optimised end-result. Iterations and subsequent reworks due to such design inefficiencies is one of the major reasons for unsuccessful project delivery as they impact project performance measures such as time and cost am...

  10. Designing the Game: How a Project-Based Media Production Program Approaches STEAM Career Readiness for Underrepresented Young Adults

    Science.gov (United States)

    Bass, Kristin M.; Hu Dahl, Ingrid; Panahandeh, Shirin

    2016-12-01

    Numerous studies have indicated a need for a diverse workforce that is more highly educated in STEM and ICT fields, and one that is capable of responding creatively to demands for continual innovation. This paper, in response, chronicles the implementation of the Digital Pathways (DP) program, a two-time ITEST recipient and an ongoing initiative of the Bay Area Video Coalition. DP has provided low-income, underrepresented minority young people with 180 contact hours of activities in digital media production to prepare them to pursue higher education and technology careers. A design-based research approach synthesizes staff interviews with student observations, interviews and artifacts to identify a set of generalizable best practices or design principles for empowering young people to move from being consumers of digital media to producers. These principles are illustrated with a case study of the 3D Animation and Gaming track from the second ITEST grant. Researchers argue for the importance of attending to the noncognitive elements of learning and illustrate ways in which instructors encouraged creative expression, personal agency, and collaboration through long-term projects. They also identify strategies for sustaining young people's participation through the establishment of a supportive community environment.

  11. USL/DBMS NASA/PC R and D project system design standards

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Moreau, Dennis R.

    1984-01-01

    A set of system design standards intended to assure the completeness and quality of designs developed for PC research and development projects is established. The standards presented address the areas of problem definition, initial design plan, design specification, and re-evaluation.

  12. Staff numbers: from words to action!

    CERN Multimedia

    Association du personnel

    2006-01-01

    2006 is a decisive year for the definition of needs for human resources and long-term budget for the Organization. The LHC is officially programmed for 31 August 2007; the Director-General has to draw up a â€ワLong-term Plan” (LTP) by the end of the year. This projected programme will specify the needs for staff fron now until 2010 and beyond, in particular in the framework of the completion and running of this unique machine.

  13. Contract policy for CERN staff members

    CERN Multimedia

    HR Department

    2009-01-01

    Public information meeting on Monday 28 September 2009 at 10.00 a.m. With effect from 1 August 2009, new provisions regarding staff employment contract policy have entered into force. These provisions are set out in: The Staff Rules and Regulations and Administrative Circular No. 2 (Rev. 4). Further details are available in: Frequently Asked Questions. The new provisions are outlined below: Limited-duration contracts From 1 August 2009, limited-duration contracts will be awarded for a maximum period of five years (instead of four years previously) and no extensions beyond five years will be granted. Contracts for periods shorter than five years can be exceptionally awarded, e.g. for a project whose mission or financial resources are time-limited. Indefinite contracts : award procedure A number of changes have been introduced regarding the procedure for the award of indefinite contracts. From now on, posts leading to the award of an indefinite contract will be opened at le...

  14. Research, design and development project Myoelectric Prosthesis of Upper Limb

    International Nuclear Information System (INIS)

    Galiano, L; Montaner, E; Flecha, A

    2007-01-01

    A Research Design and Development Project was developed of a myoelectric prosthesis for a pediatric patient presenting congenital amputation of the left forearm below the elbow. A multidisciplinary work-team was formed for this goal, in order to solve the several (/various) aspects regarding this project (mechanical, ergonomics, electronics, physical). The prosthesis as an electromechanical device was divided in several blocks, trying to achieve a focused development for each stage, acording to requisites. A mechanical prototype of the prothesis was designed and built along with the circuitry needed for EMG aquisition, control logic and drivers. Having acomplished the previuos stages, the project is now dealing with the definitions of the interface between the prosthesis and the patient, with promising perspectives

  15. Research, design and development project Myoelectric Prosthesis of Upper Limb

    Energy Technology Data Exchange (ETDEWEB)

    Galiano, L; Montaner, E; Flecha, A [Bioparx, J Hernandez 1101, Parana, ERios (Argentina)

    2007-11-15

    A Research Design and Development Project was developed of a myoelectric prosthesis for a pediatric patient presenting congenital amputation of the left forearm below the elbow. A multidisciplinary work-team was formed for this goal, in order to solve the several (/various) aspects regarding this project (mechanical, ergonomics, electronics, physical). The prosthesis as an electromechanical device was divided in several blocks, trying to achieve a focused development for each stage, acording to requisites. A mechanical prototype of the prothesis was designed and built along with the circuitry needed for EMG aquisition, control logic and drivers. Having acomplished the previuos stages, the project is now dealing with the definitions of the interface between the prosthesis and the patient, with promising perspectives.

  16. Caring for inpatient boarders in the emergency department: improving safety and patient and staff satisfaction.

    Science.gov (United States)

    Bornemann-Shepherd, Melanie; Le-Lazar, Jamie; Makic, Mary Beth Flynn; DeVine, Deborah; McDevitt, Kelly; Paul, Marcee

    2015-01-01

    Hospital capacity constraints lead to large numbers of inpatients being held for extended periods in the emergency department. This creates concerns with safety, quality of care, and dissatisfaction of patients and staff. The aim of this quality-improvement project was to improve satisfaction and processes in which nurses provided care to inpatient boarders held in the emergency department. A quality-improvement project framework that included the use of a questionnaire was used to ascertain employee and patient dissatisfaction and identify opportunities for improvement. A task force was created to develop action plans related to holding and caring for inpatients in the emergency department. A questionnaire was sent to nursing staff in spring 2012, and responses from the questionnaire identified improvements that could be implemented to improve care for inpatient boarders. Situation-background-assessment-recommendation (SBAR) communications and direct observations were also used to identify specific improvements. Post-questionnaire results indicated improved satisfaction for both staff and patients. It was recognized early that the ED inpatient area would benefit from the supervision of an inpatient director, managers, and staff. Outcomes showed that creating an inpatient unit within the emergency department had a positive effect on staff and patient satisfaction. Copyright © 2015 Emergency Nurses Association. Published by Elsevier Inc. All rights reserved.

  17. District Heating Demonstration project. Bydgoszcz, Poland, Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    The project was finished in January 1999. The present final report outlines the activities of the pilot project. The activities of the project were: Development of a general model or a design strategy for the modernisation of group substations; Training of selected staff in updated design and latest technologies; Comparing experiences from the reconstructed heat exchanger station with alternative solutions; Investigation of potential sources of financing for the modernisation of the district heating system based on a revised feasibility study. The development of a general model for the future design of the heat exchanger station and the substations resulted in a design guideline which was used for the design of the heat exchanger station. KPEC selected the heat exchanger station CC02, located in area B1, as the object for the heat exchanger reconstruction. The station supplies 42 substations in 20 dwelling houses with a total heat demand of 11 MW. The design of the reconstruction began in the autumn of 1996. The equipment was procured during the spring of 1997 and the bulk of the installation work was finished by October 1997. The appointed design engineer participated in two study tours to Denmark. During the implementation the project was enlarged with an addendum. The addendum consisted of a modernisation of twelve building substations. The monitoring programme was enlarged accordingly and the efficiency of the two solutions were compared and evaluated through the monitoring programme. Even though some of the data are rather limited, the monitoring programme reveals a tendency towards the substation modernisation being twice as efficient as the heat exchanger modernisation. The reconstruction of the heat exchanger station has indicated a heat saving potential of 10% whereas the substation project has indicated a heat saving potential of 20%. The project further shows a huge potential for power savings in the main pumps due to the automatic control. (EHS)

  18. The effects of small-scale, homelike facilities for older people with dementia on residents, family caregivers and staff: design of a longitudinal, quasi-experimental study.

    Science.gov (United States)

    Verbeek, Hilde; van Rossum, Erik; Zwakhalen, Sandra M G; Ambergen, Ton; Kempen, Gertrudis I J M; Hamers, Jan P H

    2009-01-20

    Small-scale and homelike facilities for older people with dementia are rising in current dementia care. In these facilities, a small number of residents live together and form a household with staff. Normal, daily life and social participation are emphasized. It is expected that these facilities improve residents' quality of life. Moreover, it may have a positive influence on staff's job satisfaction and families involvement and satisfaction with care. However, effects of these small-scale and homelike facilities have hardly been investigated. Since the number of people with dementia increases, and institutional long-term care is more and more organized in small-scale and homelike facilities, more research into effects is necessary. This paper presents the design of a study investigating effects of small-scale living facilities in the Netherlands on residents, family caregivers and nursing staff. A longitudinal, quasi-experimental study is carried out, in which 2 dementia care settings are compared: small-scale living facilities and regular psychogeriatric wards in traditional nursing homes. Data is collected from residents, their family caregivers and nursing staff at baseline and after 6 and 12 months of follow-up. Approximately 2 weeks prior to baseline measurement, residents are screened on cognition and activities of daily living (ADL). Based on this screening profile, residents in psychogeriatric wards are matched to residents living in small-scale living facilities. The primary outcome measure for residents is quality of life. In addition, neuropsychiatric symptoms, depressive symptoms and social engagement are assessed. Involvement with care, perceived burden and satisfaction with care provision are primary outcome variables for family caregivers. The primary outcomes for nursing staff are job satisfaction and motivation. Furthermore, job characteristics social support, autonomy and workload are measured. A process evaluation is performed to investigate to

  19. NRC review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document - Evolutionary plant designs, Chapter 1, Project No. 669

    International Nuclear Information System (INIS)

    1992-08-01

    The staff of the US Nuclear Regulatory Commission has prepared Volume 2 (Parts 1 and 2) of a safety evaluation report (SER), ''NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document -- Evolutionary Plant Designs,'' to document the results of its review of the Electric Power Research Institute's ''Advanced Light Water Reactor Utility Requirements Document.'' This SER gives the results of the staff's review of Volume II of the Requirements Document for evolutionary plant designs, which consists of 13 chapters and contains utility design requirements for an evolutionary nuclear power plant (approximately 1300 megawatts-electric)

  20. Implementing Project Based Learning Approach to Graphic Design Course

    Science.gov (United States)

    Riyanti, Menul Teguh; Erwin, Tuti Nuriah; Suriani, S. H.

    2017-01-01

    The purpose of this study was to develop a learning model based Commercial Graphic Design Drafting project-based learning approach, was chosen as a strategy in the learning product development research. University students as the target audience of this model are the students of the fifth semester Visual Communications Design Studies Program…

  1. Incorporating climate change projections into riparian restoration planning and design

    Science.gov (United States)

    Perry, Laura G.; Reynolds, Lindsay V.; Beechie, Timothy J.; Collins, Mathias J.; Shafroth, Patrick B.

    2015-01-01

    Climate change and associated changes in streamflow may alter riparian habitats substantially in coming decades. Riparian restoration provides opportunities to respond proactively to projected climate change effects, increase riparian ecosystem resilience to climate change, and simultaneously address effects of both climate change and other human disturbances. However, climate change may alter which restoration methods are most effective and which restoration goals can be achieved. Incorporating climate change into riparian restoration planning and design is critical to long-term restoration of desired community composition and ecosystem services. In this review, we discuss and provide examples of how climate change might be incorporated into restoration planning at the key stages of assessing the project context, establishing restoration goals and design criteria, evaluating design alternatives, and monitoring restoration outcomes. Restoration planners have access to numerous tools to predict future climate, streamflow, and riparian ecology at restoration sites. Planners can use those predictions to assess which species or ecosystem services will be most vulnerable under future conditions, and which sites will be most suitable for restoration. To accommodate future climate and streamflow change, planners may need to adjust methods for planting, invasive species control, channel and floodplain reconstruction, and water management. Given the considerable uncertainty in future climate and streamflow projections, riparian ecological responses, and effects on restoration outcomes, planners will need to consider multiple potential future scenarios, implement a variety of restoration methods, design projects with flexibility to adjust to future conditions, and plan to respond adaptively to unexpected change.

  2. Kemper County IGCC (tm) Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, Matt; Rush, Randall; Madden, Diane; Pinkston, Tim; Lunsford, Landon

    2012-07-01

    The Kemper County IGCC Project is an advanced coal technology project that is being developed by Mississippi Power Company (MPC). The project is a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility incorporating the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company; Kellogg, Brown, and Root (KBR); and the United States Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Alabama. The estimated nameplate capacity of the plant will be 830 MW with a peak net output capability of 582 MW. As a result of advanced emissions control equipment, the facility will produce marketable byproducts of ammonia, sulfuric acid, and carbon dioxide. 65 percent of the carbon dioxide (CO{sub 2}) will be captured and used for enhanced oil recovery (EOR), making the Kemper County facility’s carbon emissions comparable to those of a natural-gas-fired combined cycle power plant. The commercial operation date (COD) of the Kemper County IGCC plant will be May 2014. This report describes the basic design and function of the plant as determined at the end of the Front End Engineering Design (FEED) phase of the project.

  3. The Influence of Nurse Manager Leadership Style on Staff Nurse Work Engagement.

    Science.gov (United States)

    Manning, Jennifer

    2016-09-01

    Nursing literature supports the importance of an engaged nursing workforce as a means to positively influence performance. Nurse manager leadership style plays a critical role in engaging staff nurses. These relationships have been minimally studied in nurse managers and staff nurses. The aim of this study is to evaluate the influence of nurse manager leadership style factors on staff nurse work engagement. Using a descriptive correlational research design, 441 staff nurses working in 3 acute care hospitals were surveyed. Survey instruments included the Utrecht Work Engagement Scale and the Multifactorial Leadership Questionnaire 5X short form. Transactional and transformational leadership styles in nurse managers positively influenced staff nurse work engagement. Passive-avoidant leadership style in nurse managers negatively influenced staff nurse work engagement. Nurse managers who provide support and communication through transformational and transactional leadership styles can have a positive impact on staff nurse work engagement and ultimately improve organizational outcomes.

  4. Evaluating the Staff at Enterprise: Several Theoretical and Methodological Aspects

    Directory of Open Access Journals (Sweden)

    Girman Alla P.

    2017-03-01

    Full Text Available The article is aimed at generalizing and systematizing various knowledge, related to evaluation of staff, on a common theoretical-methodological basis. Concept, objectives, directions, methods, and indicators for evaluating staff in the contemporary economy were analyzed. The topicality of using the theoretical developments on staff evaluation in actual practice of functioning of enterprises has been substantiated. A new approach to the procedure of evaluation of the total human resource of enterprise, based on the life cycle of organization, has been proposed. On the basis of the proposed scientific algorithmic step-by-step approach to the evaluation of staff, managers of companies can design their own models for staff evaluation, develop its separate elements. Prospects for further researches in this direction involve relation of staff evaluation to the life cycle of employee no less than the life cycle of enterprise. Management of the life cycle of employee represents methods for management of his development that would change the level of the employee’s professional maturity as result of a system impact.

  5. PBL as a Tool for Staff Development in the Educational Transformation towards PBL

    DEFF Research Database (Denmark)

    Du, Xiangyun; Kolmos, Anette; Qvist, Palle

    2007-01-01

    Abstract Worldwide, the philosophy of problem based and project based learning (PBL) has been implemented as educational models in diverse practice of teaching and learning. Recent years have witnessed more and more educational transformations towards PBL. Despite the diversity of approaches...... and practices in the process of organizational transformation, staff development remains one of key elements in the transformation process in order to teach staff new PBL practice.. A growing body of literature discussing the role of facilitation in PBL, implementation of PBL at different levels in educational...... practice, PBL online; however, little has been documented on the practice of staff development in PBL, especially through online education in the form of PBL. This paper presents the experiences and reflections of using PBL online as a strategy for staff development based on the practice...

  6. Staff Association

    CERN Multimedia

    Staff Association

    2014-01-01

    Remove of the staff association office   The Staff Association offices are going to be renovated during the coming four months, February to May 2014. The physical move from our current premises 64/R-002 to our temporary office in  510/R-010 will take place on Friday January 31st, so the Secretariat will be closed on that day. Hence, from Monday February 3rd until the end of May 2014 the Staff Association Secretariat will be located in 510/R-010 (entrance just across the CERN Printshop).    

  7. Computational issues in alternating projection algorithms for fixed-order control design

    DEFF Research Database (Denmark)

    Beran, Eric Bengt; Grigoriadis, K.

    1997-01-01

    Alternating projection algorithms have been introduced recently to solve fixed-order controller design problems described by linear matrix inequalities and non-convex coupling rank constraints. In this work, an extensive numerical experimentation using proposed benchmark fixed-order control design...... examples is used to indicate the computational efficiency of the method. These results indicate that the proposed alternating projections are effective in obtaining low-order controllers for small and medium order problems...

  8. Competencies Setup for Nuclear Regulatory Staff in Thailand

    International Nuclear Information System (INIS)

    Pingish, Panupong; Siripirom, Lopchai; Nakkaew, Pongpan; Manuwong, Theerapatt; Wongsamarn, Vichian

    2010-01-01

    Competencies setup for regulatory bodies oversee a research reactor and nuclear power reactors in Thailand, concentrating on staff development in areas of review and assessment, inspection and enforcement, authorization, and development of regulations and guides. The regulatory body in Thailand is the Bureau of Nuclear Safety Regulation (BNSR) which belongs to the Office of Atoms for Peace (OAP). The BNSR is divided into 4 groups according to the International Atomic Energy Agency (IAEA). These groups are the nuclear safety administration group, nuclear safety technical support group, nuclear safety assessment and licensing group, and the nuclear installations inspection group. Each group is divided into senior and junior positions. The competencies model was used for implementation of staff qualification, career planning and professional progression by BNSR. Competencies are related to knowledge, skills and attitudes (KSAs) needed to perform their job. A key issue is obtaining competencies for the regulatory bodies. The systematic approach to training (SAT) has been used in several countries for improvement regulator performance. The SAT contains 5 steps, including analysis, design, development, implementation and evaluation, to achieve competencies. The SAT provides a logical progression from the identification of competencies required to perform a job to the design, development and implementation of training using the competencies model. In the first step, BNSR performs an operating analysis of training needs assessment (TNA) by using gap analysis technique, as suggested by IAEA. Individual regulatory bodies address the gap using appropriate training program, after comparing the actual and desired competency profiles to determine the gap. This paper examines competencies setup for regulatory staff of BNSR as a result of gaps analysis to establish a scheme for design characteristics of regulatory staff and training courses, thereby enhancing the regulatory

  9. Measures for Assessing the Readiness of Back-office Staff

    Directory of Open Access Journals (Sweden)

    Devender Maheshwari

    2013-02-01

    Full Text Available Purpose—Public organizations deploy state-of-the-art technological advancements to facilitate sophisticated services to the citizens, businesses, and employees. The maturity of backoffice staff to adapt, use, and utilize these technological changes at the organizational level is a prerequisite to introduce cutting-edge services. This paper investigates the maturity of backoffice staff and proposes a conceptual framework, measurement constructs, and subsequent measures for the assessment. Methodology/Design/Research—Design methodology focuses on combining research with practice. An initial framework and measurement constructs are developed based on the literature review, which are further investigated by conducting a case study at Inland Revenue, Karachi to test the usability in practice using the directive content analysis qualitative method. Findings—the outcome of measurement reveals that though the proposed framework and measurement constructs i.e. roles; responsibilities; trainings; capacity building; capabilities; and attitude are relevant and useful to assess the back-office staff readiness, the measures to assess the constructs may vary in practice depending on the size, scope, and type of the public organizations. Research limitations/implications—although the proposed measurement constructs and measures proved to be useful for assessing the back-office staff maturity, the relationships among different measures and constructs affecting the staff readiness require further research. Practical implications—the case study was conducted at single public organization, which will be extended to multiple public organizations in practice. The extension will not to allow effective testing of the usability of the proposed conceptual framework and constructs, but will also broaden the benchmarking scope. Originality/Value—back-office staff education is discussed and described in the literature as well practice, but there is hardly any

  10. Measures for Assessing the Readiness of Back-office Staff

    Directory of Open Access Journals (Sweden)

    Devender Maheshwari

    2012-12-01

    Full Text Available Purpose—Public organizations deploy state-of-the-art technological advancements to facilitate sophisticated services to the citizens, businesses, and employees. The maturity of backoffice staff to adapt, use, and utilize these technological changes at the organizational level is a prerequisite to introduce cutting-edge services. This paper investigates the maturity of backoffice staff and proposes a conceptual framework, measurement constructs, and subsequent measures for the assessment.Methodology/Design/Research—Design methodology focuses on combining research with practice. An initial framework and measurement constructs are developed based on the literature review, which are further investigated by conducting a case study at Inland Revenue, Karachi to test the usability in practice using the directive content analysis qualitative method.Findings—the outcome of measurement reveals that though the proposed framework and measurement constructs i.e. roles; responsibilities; trainings; capacity building; capabilities; and attitude are relevant and useful to assess the back-office staff readiness, the measures to assess the constructs may vary in practice depending on the size, scope, and type of the public organizations.Research limitations/implications—although the proposed measurement constructs and measures proved to be useful for assessing the back-office staff maturity, the relationships among different measures and constructs affecting the staff readiness require further research.Practical implications—the case study was conducted at single public organization, which will be extended to multiple public organizations in practice. The extension will not to allow effective testing of the usability of the proposed conceptual framework and constructs, but will also broaden the benchmarking scope.Originality/Value—back-office staff education is discussed and described in the literature as well practice, but there is hardly any

  11. Student-Designed Service-Learning Projects in an Undergraduate Neurobiology Course

    Directory of Open Access Journals (Sweden)

    Katharine V. Northcutt

    2015-12-01

    Full Text Available One of the challenges in teaching a service-learning course is obtaining student buy-in from all students in the course. To circumvent this problem, I have let students in my undergraduate Neurobiology course design their own service-learning projects at the beginning of the semester. Although this can be chaotic because it requires last-minute planning, I have made it successful through facilitating student communication in the classroom, requiring thorough project proposals, meeting with students regularly, and monitoring group progress through written reflection papers. Most of my students have strong opinions about the types of projects that they want to carry out, and many students have used connections that they have already made with local organizations. Almost all projects that students have designed to this point involve teaching basic concepts of neurobiology to children of various ages while simultaneously sparking their interest in science. Through taking ownership of the project and designing it such that it works well with their strengths, interests, and weekly schedule, students have become more engaged in service learning and view it as a valuable experience. Despite some class time being shifted away from more traditional assignments, students have performed equally well in the course, and they are more eager to talk with others about course concepts. Furthermore, the feedback that I have received from community partners has been excellent, and some students have maintained their work with the organizations.

  12. Job Satisfaction of Catholic Primary School Staff: A Study of Biographical Differences

    Science.gov (United States)

    De Nobile, John J.; McCormick, John

    2008-01-01

    Purpose: This study's purpose is to examine the relationships between the biographical characteristics gender, age, years of experience and employment position, and job satisfaction of staff members in Catholic primary schools. Design/methodology/approach: Survey data were collected from 356 staff members from Catholic primary schools. Research…

  13. Design considerations for a servo optical projection system

    Science.gov (United States)

    Nadalsky, Michael; Allen, Daniel; Bien, Joseph

    1987-01-01

    The present servooptical projection system (SOPS) furnishes 'out-the-window' scenery for a pilot-training flight simulator; attention is given to the parametric tradeoffs made in the SOPS' optical design, as well as to its mechanical packaging and the servonetwork performance of the unit as integrated into a research/training helicopter flight simulator. The final SOPS configuration is a function of scan head design, assembly modularity, image deterioration method, and focal lengths and relative apertures.

  14. Geomatics engineering a practical guide to project design

    CERN Document Server

    Ogaja, Clement A

    2010-01-01

    OVERVIEWProject Design ProcessUnderstanding Project RequirementsInformation GatheringDesign ApproachesScheduling and Cost EstimatingWriting ProposalsBibliographyExercises CONTEMPORARY ISSUESStandards and SpecificationsDefinitionsApplication Modes of a StandardUnits of MeasureAccuracy versus PrecisionEquipment SpecificationsLimits of ClosureLeast Squares AnalysisMapping and GIS StandardsClassical Surveying StandardsGPS Surveying StandardsOther StandardsBibliography ExercisesProfessional and Ethical ResponsibilitiesKnow What You DoEthics and Professional Conduct Individual and Team Responsibilit

  15. Project W-236A, work plan for preparation of a design requirements document

    International Nuclear Information System (INIS)

    Groth, B.D.

    1995-01-01

    This work plan outlines the tasks necessary, and defines the organizational responsibilities for preparing a Design Requirements Document (DRD) for project W-236A, Multi-Function Waste Tank Facility (MWTF). A DRD is a Systems Engineering document which bounds, at a high level, the requirements of a discrete system element of the Tank Waste Remediation System (TWRS) Program. This system element is usually assigned to a specific project, in this case the MWTF. The DRD is the document that connects the TWRS program requirements with the highest level projects requirements and provides the project's link to the overall TWRS mission. The MWTF DRD effort is somewhat unique in that the project is already in detailed design, whereas a DRO is normally prepared prior to preliminary design. The MWTF design effort was initiated with a Functional Design Criteria (FDC) and a Supplemental Design Requirements Document (SDRD) bounding the high level requirements. Another unique aspect of this effort is that some of the TWRS program requirements are still in development. Because of these unique aspects of the MWTF DRD development, the MWTF will be developed from existing TWRS Program requirements and project specific requirements contained in the FDC and SDRD. The following list describes the objectives of the MWTF DRD: determine the primary functions of the tanks through a functional decomposition of the TWRS Program high level functions; allocate the primary functions to a sub-system architecture for the tanks; define the fundamental design features in terms of performance requirements for the system and subsystems; identify system interfaces and design constraints; and document the results in a DRD

  16. Systems design and engineering : facilitating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    2016-01-01

    As its name implies, the aim of Systems Design and Engineering: Facilitating Multidisciplinary Development Projects is to help systems engineers develop the skills and thought processes needed to successfully develop and implement engineered systems. Such expertise typically does not come through

  17. 13 CFR 305.4 - Projects for design and engineering work.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Projects for design and engineering work. 305.4 Section 305.4 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION... construction Project in a format and in sufficient quantity to permit advertisement and award of a construction...

  18. Staff-family relationships in nursing home care: a typology of challenging behaviours.

    Science.gov (United States)

    Bauer, Michael

    2007-09-01

    Aim.  This paper draws on data from a study which investigated how Australian nursing home staff constructed staff-family relationships. Background.  Working with the family in aged care to provide the best care possible is consistent with modern nursing philosophy which espouses holistic care. The quality and enjoyment of the experience however, is frequently fraught with problems and challenges for both the staff and the family involved. Design.  A qualitative constructivist design as described by Guba and Lincoln [Fourth Generation Evaluation. Sage Publications, London.] was used. Method.  Thirty paid caregivers drawn from eight nursing homes were interviewed about their experiences of working with residents' families. A constant comparative method of data analysis was used to arrive at the findings. Results.  This paper reports on seven themes under the category of 'unacceptable behaviours'. These themes describe a range of attitudes and behaviours exhibited by families which staff members found undesirable. Conclusions.  Staff members found a number of family behaviours challenging. Nursing home staff perceives the family as subordinate to their needs and want to retain control of the work environment. Relevance to clinical practice.  Nursing home staff need to move away from custodial models of care focused on 'getting the work done' and develop more family friendly work practices that are inclusive of the needs of the family and view them as equal partners in care.

  19. The Impact of Staff Training on the Knowledge of Support Staff in Relation to Bereavement and People with an Intellectual Disability

    Science.gov (United States)

    Watters, Laura; McKenzie, Karen; Wright, Rachel

    2012-01-01

    This study aimed to investigate whether a 1-day training course improved support staff knowledge about bereavement and grief in people with a learning disability. A questionnaire based, mixed design was used. Forty-eight participants were randomly assigned to one of two equal groups. A staggered design allowed for group 2 to act both as a control…

  20. Design requirements document for Project W-465, immobilized low-activity waste interim storage

    International Nuclear Information System (INIS)

    Burbank, D.A.

    1998-01-01

    The scope of this Design Requirements Document (DRD) is to identify the functions and associated requirements that must be performed to accept, transport, handle, and store immobilized low-activity waste (ILAW) produced by the privatized Tank Waste Remediation System (TWRS) treatment contractors. The functional and performance requirements in this document provide the basis for the conceptual design of the TWRS ILAW Interim Storage facility project and provides traceability from the program level requirements to the project design activity. Technical and programmatic risk associated with the TWRS planning basis are discussed in the Tank Waste Remediation System Decisions and Risk Assessment (Johnson 1994). The design requirements provided in this document will be augmented by additional detailed design data documented by the project

  1. Staff management, training and knowledge management

    International Nuclear Information System (INIS)

    Makino, Hitoshi; Umeki, Hiroyuki; Capouet, M.; Depaus, C.; Berckmans, A.

    2014-01-01

    Staff management/training and knowledge management are organisational issues that are particularly sensitive in long-term projects stretching over decades like the development and operation of a geological repository. The IAEA has already issued several publications that deal with this issue (IAEA, 2006, 2008). Organisational aspects were also discussed in the framework of a topical session organised by the Integration Group for the Safety Case (IGSC) at its annual meeting in 2009 and were regarded as a topic deserving future attention (NEA, 2009a). More recently, the Forum on Stakeholder Confidence (FSC) identified organisational, mission and behavioural features as attributes of confidence and trust (NEA, 2013). They also identified that aspects such as structural learning capacity, high levels of skill and competence in relevant areas, specific management plan, good operating records, transparency and consistency are associated with confidence building in a safety case. These aspects are considerably related to staff training/management and knowledge management. The IGSC has initiated a proposal of study dedicated to staff training/management and knowledge management with the objective to highlight how these recent concerns and the requirements issued by the IAEA are concretely implemented in the national programmes. The goal of this study is to acknowledge the differences of views and needs for staff management and knowledge management at different stages of individual programmes and between implementer and regulator. As a starting point to this study, the JAEA and ONDRAF/NIRAS prepared a draft questionnaire in order to succinctly capture processes and tools that the national organisations have implemented to meet the requirements and address the issues set out in the field of staff and knowledge management. For the purpose of this study, a questionnaire is now under development, which will be presented on the occasion of this symposium with guidance based on a

  2. Facilitating Client Value Creation in the Conceptual Design Phase of Construction Projects

    DEFF Research Database (Denmark)

    Thyssen, Mikael Hygum; Emmitt, Stephen; Bonke, Sten

    2009-01-01

    If client values are not fully understood in a construction project it is likely to result in either low fulfilment of client expectations or multiple design alterations during the project process which lead to additional costs and frustration among the project participants. However...... by the fact that the delivery team, which is responsible for understanding and delivering client value, is made up of even more different parties. The paper reports the initial outcome of a joint research project between academics and practitioners, which aims to develop a practical workshop model...... that incorporates client values into the conceptual design of construction projects. The workshop model draws on value management and lean thinking as underlying principles in an attempt to address the ambiguous concept of ‘value’....

  3. Validation of the STAFF-5 computer model

    International Nuclear Information System (INIS)

    Fletcher, J.F.; Fields, S.R.

    1981-04-01

    STAFF-5 is a dynamic heat-transfer-fluid-flow stress model designed for computerized prediction of the temperature-stress performance of spent LWR fuel assemblies under storage/disposal conditions. Validation of the temperature calculating abilities of this model was performed by comparing temperature calculations under specified conditions to experimental data from the Engine Maintenance and Dissassembly (EMAD) Fuel Temperature Test Facility and to calculations performed by Battelle Pacific Northwest Laboratory (PNL) using the HYDRA-1 model. The comparisons confirmed the ability of STAFF-5 to calculate representative fuel temperatures over a considerable range of conditions, as a first step in the evaluation and prediction of fuel temperature-stress performance

  4. Colour and inclusivity: a visual communication design project with older people.

    Science.gov (United States)

    da Silva, Fernando Moreira

    2012-01-01

    In an ideal world, inclusive products and services would be the standard and not the exception. This paper presents a systematic approach to an overlap between Visual Communication Design, Printed Colour and Inclusive Design, for older people, with the aim to develop of a set of research-based ageing and ergonomics-centred communication design guidelines and recommendations for printed material (analogical displays). The approach included an initial extensive literature review in the area of colour, older people and ergonomics issues and vision common diseases, communication design. The second phase was the implementation of an experiment to measure the different colour experiences of the participants in two sample groups (one in UK and another one in Portugal), using printed material, to find out the colours one should use in analogical communication material, being aware of the colour contrast importance (foreground versus background) and the difficulties experienced by older people to read and understand lettering, signs. As main contribution of this research project, we developed a set of guidelines and recommendations based on the reviewed literature and the sample groups' findings, trying to demonstrate the importance of these guidelines when conceiving a new communicational design project in a way this project will achieve vision comfort and understandability, especially for older people, in an inclusive design perspective.

  5. Investigating the Importance of Sports Facilities & Staff for Football Fans

    Directory of Open Access Journals (Sweden)

    Pinelopi Athanasopoulou

    2012-01-01

    Full Text Available (a Purpose: This study seeks to investigate the importance of facilities and staff for football fans in Greece. (b Design/methodology/approach: A survey was carried out during two matches of Superleague games with a convenience sample of 312 spectators. A structured questionnaire was used with scales based on previous research. (c Findings: Factor analysis revealed four reliable factor dimensions: facilities design; staff; facilities maintenance, and quick & easy access. Staff and quick & easy access are shown to be the most important dimensions for respondents followed by the other two. Results also indicated that there are significant differences in the importance assigned to these 4 factor dimensions among different levels of age; education; income, and marital status. (d Research limitations/implications: This study is limited to one sport and on a convenience sample of football fans. Future research can validate further these findings and increase their generalisability. (e Practical implications: The results of this study challenge sport managers to manage effectively the design of the stadium; the processes of entry and exit of fans; the environment of the game; and the quality of stadium facilities.

  6. Staff Performance Analysis: A Method for Identifying Brigade Staff Tasks

    National Research Council Canada - National Science Library

    Ford, Laura

    1997-01-01

    ... members of conventional mounted brigade staff. Initial analysis of performance requirements in existing documentation revealed that the performance specifications were not sufficiently detailed for brigade battle staffs...

  7. Effects of a Staff Training Intervention on Seclusion Rates on an Adult Inpatient Psychiatric Unit.

    Science.gov (United States)

    Newman, Julie; Paun, Olimpia; Fogg, Louis

    2018-06-01

    The current article presents the effects of a 90-minute staff training intervention aimed at reducing inpatient psychiatric seclusion rates through strengthened staff commitment to seclusion alternatives and improved de-escalation skills. The intervention occurred at an 18-bed adult inpatient psychiatric unit whose seclusion rates in 2015 were seven times the national average. Although the project's primary outcome compared patient seclusion rates before and after the intervention, anonymous staff surveys measured several secondary outcomes. Seclusion rates were reduced from a 6-month pre-intervention average of 2.95 seclusion hours per 1,000 patient hours to a 6-month post-intervention average of 0.29 seclusion hours per 1,000 patient hours, a 90.2% reduction. Completed staff surveys showed significant staff knowledge gains, non-significant changes in staff attitudes about seclusion, non-significant changes in staff de-escalation skill confidence, and use of the new resource sheet by only 17% of staff. The key study implication is that time-limited, focused staff training interventions can have a measurable impact on reducing inpatient seclusion rates. [Journal of Psychosocial Nursing and Mental Health Services, 56(6), 23-30.]. Copyright 2018, SLACK Incorporated.

  8. Factors that enable and hinder the implementation of projects in the alcohol and other drug field.

    Science.gov (United States)

    MacLean, Sarah; Berends, Lynda; Hunter, Barbara; Roberts, Bridget; Mugavin, Janette

    2012-02-01

    Few studies systematically explore elements of successful project implementation across a range of alcohol and other drug (AOD) activities. This paper provides an evidence base to inform project implementation in the AOD field. We accessed records for 127 completed projects funded by the Alcohol, Education and Rehabilitation Foundation from 2002 to 2008. An adapted realist synthesis methodology enabled us to develop categories of enablers and barriers to successful project implementation, and to identify factors statistically associated with successful project implementation, defined as meeting all funding objectives. Thematic analysis of eight case study projects allowed detailed exploration of findings. Nine enabler and 10 barrier categories were identified. Those most frequently reported as both barriers and enablers concerned partnerships with external agencies and communities, staffing and project design. Achieving supportive relationships with partner agencies and communities, employing skilled staff and implementing consumer or participant input mechanisms were statistically associated with successful project implementation. The framework described here will support development of evidence-based project funding guidelines and project performance indicators. The study provides evidence that investing project hours and resources to develop robust relationships with project partners and communities, implementing mechanisms for consumer or participant input and attracting skilled staff are legitimate and important activities, not just in themselves but because they potentially influence achievement of project funding objectives. © 2012 The Authors. ANZJPH © 2012 Public Health Association of Australia.

  9. NRC review of Electric Power Research Institute's advanced light water reactor utility requirements document. Passive plant designs, chapters 2-13, project number 669

    International Nuclear Information System (INIS)

    1994-08-01

    The Electric Power Research Institute (EPRI) is preparing a compendium of technical requirements, referred to as the open-quotes Advanced Light Water Reactor [ALWR] Utility Requirements Documentclose quotes, that is acceptable to the design of an ALWR power plant. When completed, this document is intended to be a comprehensive statement of utility requirements for the design, construction, and performance of an ALWR power plant for the 1990s and beyond. The Requirements Document consists of three volumes. Volume I, open-quotes ALWR Policy and Summary of Top-Tier Requirementsclose quotes, is a management-level synopsis of the Requirements Document, including the design objectives and philosophy, the overall physical configuration and features of a future nuclear plant design, and the steps necessary to take the proposed ALWR design criteria beyond the conceptual design state to a completed, functioning power plant. Volume II consists of 13 chapters and contains utility design requirements for an evolutionary nuclear power plant [approximately 1350 megawatts-electric (MWe)]. Volume III contains utility design requirements for nuclear plants for which passive features will be used in their designs (approximately 600 MWe). In April 1992, the staff of the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, issued Volume 1 and Volume 2 (Parts 1 and 2) of its safety evaluation report (SER) to document the results of its review of Volumes 1 and 2 of the Requirements Document. Volume 1, open-quotes NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document - Program Summaryclose quotes, provided a discussion of the overall purpose and scope of the Requirements Document, the background of the staff's review, the review approach used by the staff, and a summary of the policy and technical issues raised by the staff during its review

  10. Interactive Room Support for Complex and Distributed Design Projects

    DEFF Research Database (Denmark)

    Grønbæk, Kaj; Gundersen, Kristian Kroyer; Mogensen, Preben Holst

    2001-01-01

    We are investigating the design of digital 3D interaction technology embedded in a physical environment. We take as point of departure cemplex, collaborative industrial design projects involving heterogeneous sets of documents, and physical as well as digital 3D models. The paper introduces our...... interaction devices being experimented with in the interactive room environment. The interactive room technologies have all been designed with the requirement that they must seamlessly integrate both into the physical and into the digital work environment while providing new affordances for industrial design...

  11. Elections to Staff Council

    CERN Multimedia

    Staff Association

    2011-01-01

    Elections to fill all seats in the Staff Council are being organized this month. The voting takes place from the 31st of October to the 14th of November, at noon. As you may have noted when reading Echo, many issues concerning our employment conditions are on the agenda of the coming months and will keep the next Staff Council very busy. So, make your voice heard and take part in the elections for a new Staff Council. By doing so, you will be encouraging the men and women who will be representing you over the next two years and they will doubtless appreciate your gratitude. Every member of the Staff Association will have received an email containing a link to the webpage which will allow voting. If you are a member of the Staff Association and you did not receive such an email, please contact the Staff Association secretariat (staff.association@cern.ch). Do not forget to vote * * * * * * * Vote Make your voice heard and be many to elect the new Staff Council. More details on the election...

  12. Planning a change project in mental health nursing.

    Science.gov (United States)

    Thorpe, Rebecca

    2015-09-02

    This article outlines a plan for a change project to improve the quality of physical health care on mental health wards. The plan was designed to improve the monitoring and recording of respiratory rates on mental health wards, through the implementation of a training programme for staff. A root cause analysis was used to explore the reasons for the low incidence of respiratory rate measurement on mental health wards, and the results of this establish the basis of the proposed change project and its aims and objectives. The article describes how the project could be implemented using a change management model, as well as how its effects could be measured and evaluated. Potential barriers to the planned change project are discussed, including the human dimensions of change. The article suggests methods to overcome such barriers, discusses the value of leadership as an important factor, and examines the principles of clinical governance in the context of the planned change project.

  13. Radiation exposure to staff involved in diagnostic and therapeutic nuclear medicine procedures in some hospitals in Sudan

    International Nuclear Information System (INIS)

    Salih, Lamia Hamza Bashir

    2015-05-01

    Study was performed to evaluate radiation dose to staff involved in nuclear medicine procedures in some hospitals in Sudan. 15 radiation workers were studied in three hospitals. Radiation dose was measured using personal dose equivalent Hp (10), using calibrated electronic personal dosimeters (EPDs) worn on the chest and read at the end of the day. Staff doses were monitored in each hospital for a period of four weeks, The measured monthly Hp(10) values to staff ranged between 82.96-83.94μSv (to nurses), 38.81-53.97 μSv (to pharmacists), 16.87-70.21μSv (to technologists), 40.22-76.56μSv (to medical physicists). These mean monthly radiation doses were projected to the annual radiation doses received by the staff. The mean monthly radiation doses were projected to the annual radiation doses were found to be between ranges (185.57-923.34μSv/y). Results found showed that there was no dose that exceeded the limits of annual dose recommended for workers by International Commission on Radiology Protection (ICRP) (20 mSv/year). This study is expected to increase the awareness of staff about the radiation hazards and protection.(Author)

  14. Patient and staff doses and relationships between them in fluoroscopically guided procedures

    International Nuclear Information System (INIS)

    Avramova-Cholakova, S.; Christova-Popova, Y.; Sagorska, A.

    2015-01-01

    Full text: Medical exposure has the main contribution to man-made sources of exposures to the population in developed countries. Fluoroscopically guided procedures in interventional cardiology, gastroenterology, urology, orthopaedics and others may be related to high doses to both patients and staff. The main risk for both groups is the radiation carcinogenesis and it is increasing with dose. However deterministic effects are also possible: severe patient skin injuries occur sometimes. There are such cases in Bulgarian radiological practice. For the medical staff, involved in the procedures, radiation induced cataract is observed occasionally. Learning objective: In many cases there is direct correlation between patient and staff doses. Several simple rules must be observed in order to decrease exposure. Rules related to patient: Patient dose (dose-area product (DAP), fluoroscopy time, number of series,number of images) should be recorded for every patient; The patient should be positioned as far away as possible from the x-ray tube and as closer as possible to the image intensifier/digital image receptor; Fluoroscopy time should be minimized; Pulsed fluoroscopy with the lowest dose rate and the lowest frame rate providing acceptable image quality should be used; Different skin areas should be exposed in different projections; Oblique projections increase the dose - they should be avoided; Magnification also increases the dose several times and should be avoided; The acquisition mode should be avoided; it delivers dozens of times higher doses. Minimal number of frames and cine runs should be used. Use of “last image hold” is encouraged; The x-ray beam should be collimated to the area of interest. Rules related to staff: The staff receives scattered radiation from patient’s body. Every measure to decrease patient’s dose decreases staff dose as well; Every available protective device should be used (lead apron, thyroid collar, lead glasses, screens). They

  15. A Web-Based Monitoring System for Multidisciplinary Design Projects

    Science.gov (United States)

    Rogers, James L.; Salas, Andrea O.; Weston, Robert P.

    1998-01-01

    In today's competitive environment, both industry and government agencies are under pressure to reduce the time and cost of multidisciplinary design projects. New tools have been introduced to assist in this process by facilitating the integration of and communication among diverse disciplinary codes. One such tool, a framework for multidisciplinary computational environments, is defined as a hardware and software architecture that enables integration, execution, and communication among diverse disciplinary processes. An examination of current frameworks reveals weaknesses in various areas, such as sequencing, displaying, monitoring, and controlling the design process. The objective of this research is to explore how Web technology, integrated with an existing framework, can improve these areas of weakness. This paper describes a Web-based system that optimizes and controls the execution sequence of design processes; and monitors the project status and results. The three-stage evolution of the system with increasingly complex problems demonstrates the feasibility of this approach.

  16. System Design and Engineering, lubricating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    This text book introduces systems engineering for designing systems in multidisciplinary projects. First an overview of the systems engineering process is given. Several systems thinking tracks are presented, to think about the system in a number of ways, its context, its user, its functionality,

  17. 6 Project-Management Tips

    Science.gov (United States)

    Demski, Jennifer

    2012-01-01

    When it comes to project management, the IT department is typically its own worst enemy. When project requests are pushed through the budgeting process by different departments, it's up to IT to make them all work. The staff is required to be "heroic" to get the project load done. People get to work over weekends and postpone their vacations. The…

  18. Training of technical staff for nuclear power station operation

    International Nuclear Information System (INIS)

    Haire, T.P.; Myerscough, P.B.

    1981-01-01

    The statutory training requirements covering the technical staff in the CEGB (Central Electricity Generating Board) are discussed. Details of the training programmes emphasize the importance of the staff having a thorough understanding of the nuclear processes involved in the station operation and not relying solely upon a mechanistic approach to operating procedures. The impact of this philosophy on the design of training simulators is examined and a brief comparison is made with the training philosophies in other countries. (U.K.)

  19. NRC review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document - Evolutionary plant designs, Chapters 2--13, Project No. 669

    International Nuclear Information System (INIS)

    1992-08-01

    The staff of the US Nuclear Regulatory Commission has prepared Volume 2 (Parts 1 and 2) of a safety evaluation report (SER), ''NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document -- Evolutionary Plant Designs,'' to document the results of its review of the Electric Power Research Institute's ''Advanced Light Water Reactor Utility Requirements Document.'' This SER gives the results of the staff's review of Volume II of the Requirements Document for evolutionary plant designs, which consists of 13 chapters and contains utility design requirements for an evolutionary nuclear power plant (approximately 1300 megawatts-electric)

  20. Mirror Confinement Systems: project summaries

    International Nuclear Information System (INIS)

    1980-07-01

    This report contains descriptions of the projects supported by the Mirror Confinement Systems (MCS) Division of the Office of Fusion Energy. The individual project summaries were prepared by the principal investigators, in collaboration with MCS staff office, and include objectives and milestones for each project. In addition to project summaries, statements of Division objectives and budget summaries are also provided

  1. A quantitative analysis study on the implementation of partnering in the design and build construction project

    Science.gov (United States)

    Halil, F. M.; Nasir, N. M.; Shukur, A. S.; Hashim, H.

    2018-02-01

    Design and Build construction project involved the biggest scale of the cost of investment as compared to the traditional approach. In Design and Build, the client hires a design professional that will design according to the client’s need and specification. This research aim is to explore the concept of partnering implementation practiced in the design and build procurement approach. Therefore, the selection of design professionals such as Contractors and consultants in the project is crucial to ensure the successful project completion on time, cost, and quality. The methodology adopted using quantitative approach. Administration of the questionnaire was distributed to the public client by using postal survey. Outcomes of the results, the public clients agreed that project management capabilities and commitment to budget as a crucial element of partnering from the design professional in design and build construction project.

  2. Managing nuclear projects: a design agency experience in the design-build of waste management facilities in Canada

    International Nuclear Information System (INIS)

    Brewer, R.; Calzolari, L.

    2006-01-01

    Quality Assurance guarantees the quality of a product; it does not guarantee that it is a quality product. As procedures develop to satisfy QA programs and regulatory needs it is necessary to find ways to ensure that procedural management reinforces project management and does not detract from it. CANATOM NPM's experience in bidding for and executing the design or design and construction of nuclear waste management facilities demonstrates how design excellence and innovation can still be achieved while successfully managing the challenge of technical administration. The sourcing of expertise, the intricacies of design definition and the coordinating efforts required in the execution of the projects (one fully completed, the other into its engineering phase) will provide a valuable insight into the role and activities of an engineering company engaged in a 'Design Agency' (DA) role. (author)

  3. Design of inverters for the PHOTONERGY project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-08-01

    The PHOTONERGY project (the former SolcelleInverter project) was initiated on the 1st of September 2001, with a state-of-the-art analysis, which concluded into specifications. Based on this 23 topologies were analyzed in for efficiencies. The results from this analysis was five candidates which all showed a somewhat good efficiency. These five topologies were in further investigated by means of an initial design-iteration and simulations. Two different solutions were picked up in due to their high efficiency and low cost. 1. The standard full-bridge phase shifted DC/DC converter together with a standard DC/AC inverter, 2. A modified version of the novel Shimizu topology. A patent is pending on this modified version. These two inverters are in this document developed and made ready for prototyping. This includes design and selection of reactive- and switching-components, e.g. filter- and bulk-capacitors, low- and high-frequency inductors, high frequency transformers, MOSFETs and diodes. The design of auxiliary circuits is also included, e.g. gate drivers for the MOSFETs, measuring circuits for the grid-current and -voltage, PV-module-current and voltage, protection circuits, hardware near controllers and finally a switch mode power supply. However, the design of the various controllers, except the hardware near PV-current controller for the full bridge phase shifted converter, is not documented in this report but will come later on. This includes all controllers, e.g. maximum power point tracking for the PV-module, utility grid current controller, DC-link voltage controller, phase locked loops, and detection of islanding operation. All of these control loops are to be implemented in a micro-controller. (au)

  4. An intelligent and interactive carpet role of design in a textile innovation project

    NARCIS (Netherlands)

    Deckers, E.J.L.; Stouw, van der B.; Peutz, J.

    2012-01-01

    This paper presents an ongoing innovation project on the development of an intelligent and interactive carpet called PeR+, short for Perception Rug Plus. This design-research project is a collaboration between an international flooring company, DESSO, and the Department of Industrial Design at the

  5. Integration and the hold-up problem in the design organization for engineering projects

    NARCIS (Netherlands)

    Zerjav, Vedran; Hartmann, Timo; Javernick-Will, A.; Chinowsky, P.

    2012-01-01

    The paper presents a perspective of the design organization in engineering projects based on the economic concept of the hold-up problem. By integrating the economic theories on the boundaries of organizations into the existing knowledge on design in engineering projects, the paper hypothesizes a

  6. SLUDGE TREATMENT PROJECT KOP CONCEPTUAL DESIGN CONTROL DECISION REPORT

    International Nuclear Information System (INIS)

    Carro, C.A.

    2010-01-01

    This control decision addresses the Knock-Out Pot (KOP) Disposition KOP Processing System (KPS) conceptual design. The KPS functions to (1) retrieve KOP material from canisters, (2) remove particles less than 600 (micro)m in size and low density materials from the KOP material, (3) load the KOP material into Multi-Canister Overpack (MCO) baskets, and (4) stage the MCO baskets for subsequent loading into MCOs. Hazard and accident analyses of the KPS conceptual design have been performed to incorporate safety into the design process. The hazard analysis is documented in PRC-STP-00098, Knock-Out Pot Disposition Project Conceptual Design Hazard Analysis. The accident analysis is documented in PRC-STP-CN-N-00167, Knock-Out Pot Disposition Sub-Project Canister Over Lift Accident Analysis. Based on the results of these analyses, and analyses performed in support of MCO transportation and MCO processing and storage activities at the Cold Vacuum Drying Facility (CVDF) and Canister Storage Building (CSB), control decision meetings were held to determine the controls required to protect onsite and offsite receptors and facility workers. At the conceptual design stage, these controls are primarily defined by their safety functions. Safety significant structures, systems, and components (SSCs) that could provide the identified safety functions have been selected for the conceptual design. It is anticipated that some safety SSCs identified herein will be reclassified based on hazard and accident analyses performed in support of preliminary and detailed design.

  7. Designing “Theory of Machines and Mechanisms” course on Project Based Learning approach

    DEFF Research Database (Denmark)

    Shinde, Vikas

    2013-01-01

    by the industry and the learning outcomes specified by the National Board of Accreditation (NBA), India; this course is restructured on Project Based Learning approach. A mini project is designed to suit course objectives. An objective of this paper is to discuss the rationale of this course design......Theory of Machines and Mechanisms course is one of the essential courses of Mechanical Engineering undergraduate curriculum practiced at Indian Institute. Previously, this course was taught by traditional instruction based pedagogy. In order to achieve profession specific skills demanded...... and the process followed to design a project which meets diverse objectives....

  8. The PEP-II Project: Low-Energy Ring Design and Project Status

    International Nuclear Information System (INIS)

    Zisman, Michael S.

    2006-01-01

    We describe the present status of the PEP-II project. The project comprises four major systems: Injector, High-Energy Ring (HER), Low-Energy Ring (LER), and Interaction Region (IR). We focus in detail on the design of the LER, as its parameters and requirements are most closely related to those required for the Beijing Tau-Charm Factory rings. The PEP-II LER is a high-current, 3.1-GeV positron ring mounted above the 9-GeV HER. The LER uses a wiggler located in one of its six straight sections to provide emittance control and additional damping. We describe the rather complicated IR, which must transport the LER beam into the plane of the HER, focus it to a common beam size, and separate the beams after the head-on collisions. Both permanent magnet and conventional electromagnets are used in this area. The LER lattice has now adopted a simplified non-interleaved sextupole correction scheme that has reduced the required number of sextupoles substantially. We describe the LER vacuum system, one of the most challenging subsystems in PEP-II. It employs several technologies. In the arcs, aluminum extrusions and titanium sublimation pumps are employed; the straight sections use stainless steel chambers with lumped ion pumps. In the wiggler area, an extended copper photon dump with nonevaporable getter (NEG) pumps is employed to handle the very large synchrotron radiation power. The design of the room-temperature RF system, the bunch-by-bunch longitudinal and transverse feedback systems, and some of the special diagnostics will be described briefly. The PEP-II project remains on schedule to begin commissioning of the HER in April 1997, followed by the LER a year later

  9. Integration of case study approach, project design and computer ...

    African Journals Online (AJOL)

    Integration of case study approach, project design and computer modeling in managerial accounting education ... Journal of Fundamental and Applied Sciences ... in the Laboratory of Management Accounting and Controlling Systems at the ...

  10. Design of management information system for nuclear industry architectural project costs

    International Nuclear Information System (INIS)

    Zhang Xingzhi; Li Wei

    1996-01-01

    Management Information System (MIS) for nuclear industry architectural project is analysed and designed in detail base on quota management and engineering budget management of nuclear industry in respect of the practice of Qinshan Second Phase 2 x 600 MW Project

  11. A Case Study of User-Centred Design in Four Swiss RUP Projects

    Directory of Open Access Journals (Sweden)

    Ljiljana Vukelja

    2010-01-01

    Full Text Available We analysed four Rational Unified Process (RUP projects in Switzerland that identified themselves as following a user-centred approach. Grounded theory served for analysis of 12 interviews with software developers, project managers, and UI specialists. For each professional group we analysed their work context, motivations, work practices, and strategies used to overcome the obstacles to user-centred design. Results show that end users did not participate in the projects. Instead of working directly with end users, participants used data from marketing research or consulted colleagues from other departments. Prototypes played an important role. We suggest the following remedies: (1 developing methods for easy integration of existing company knowledge about products with usability features, (2 professionalising UI design by educating project stakeholders in standard UI design, (3 creating an approved pool of company's personas for UI specialists' work, and (4 educating customers on their right to get good user interfaces.

  12. Sexual health of ethnic minority MSM in Britain (MESH project: design and methods

    Directory of Open Access Journals (Sweden)

    Low Nicola

    2010-07-01

    Full Text Available Abstract Background Men who have sex with men (MSM remain the group most at risk of acquiring HIV infection in Britain. HIV prevalence appears to vary widely between MSM from different ethnic minority groups in this country for reasons that are not fully understood. The aim of the MESH project was to examine in detail the sexual health of ethnic minority MSM living in Britain. Methods/Design The main objectives of the MESH project were to explore among ethnic minority MSM living in Britain: (i sexual risk behaviour and HIV prevalence; (ii their experience of stigma and discrimination; (iii disclosure of sexuality; (iv use of, and satisfaction with sexual health services; (v the extent to which sexual health services (for treatment and prevention are aware of the needs of ethnic minority MSM. The research was conducted between 2006 and 2008 in four national samples: (i ethnic minority MSM living in Britain; (ii a comparison group of white British MSM living in Britain; (iii NHS sexual health clinic staff in 15 British towns and cities with significant ethnic minority communities and; (iv sexual health promotion/HIV prevention service providers. We also recruited men from two "key migrant" groups living in Britain: MSM born in Central or Eastern Europe and MSM born in Central or South America. Internet-based quantitative and qualitative research methods were used. Ethnic minority MSM were recruited through advertisements on websites, in community venues, via informal networks and in sexual health clinics. White and "key migrant" MSM were recruited mostly through Gaydar, one of the most popular dating sites used by gay men in Britain. MSM who agreed to take part completed a questionnaire online. Ethnic minority MSM who completed the online questionnaire were asked if they would be willing to take part in an online qualitative interview using email. Service providers were identified through the British Association of Sexual Health and HIV (BASHH and

  13. Solar Collector Design Optimization: A Hands-on Project Case Study

    Science.gov (United States)

    Birnie, Dunbar P., III; Kaz, David M.; Berman, Elena A.

    2012-01-01

    A solar power collector optimization design project has been developed for use in undergraduate classrooms and/or laboratories. The design optimization depends on understanding the current-voltage characteristics of the starting photovoltaic cells as well as how the cell's electrical response changes with increased light illumination. Students…

  14. Factors affecting staff morale on inpatient mental health wards in England: a qualitative investigation

    Directory of Open Access Journals (Sweden)

    Paul Moli

    2011-04-01

    Full Text Available Abstract Background Good morale among staff on inpatient psychiatric wards is an important requirement for the maintenance of strong therapeutic alliances and positive patient experiences, and for the successful implementation of initiatives to improve care. More understanding is needed of mechanisms underlying good and poor morale. Method We conducted individual and group interviews with staff of a full range of disciplines and levels of seniority on seven NHS in-patient wards of varying types in England. Results Inpatient staff feel sustained in their potentially stressful roles by mutual loyalty and trust within cohesive ward teams. Clear roles, supportive ward managers and well designed organisational procedures and structures maintain good morale. Perceived threats to good morale include staffing levels that are insufficient for staff to feel safe and able to spend time with patients, the high risk of violence, and lack of voice in the wider organisation. Conclusions Increasing employee voice, designing jobs so as to maximise autonomy within clear and well-structured operational protocols, promoting greater staff-patient contact and improving responses to violence may contribute more to inpatient staff morale than formal support mechanisms.

  15. Using Agile Project Management to Enhance the Performance of Instructional Design Teams

    Science.gov (United States)

    Sweeney, David S.; Cifuentes, Lauren

    2010-01-01

    Instructional design models describe in detail methodologies for designing effective instruction. Several widely adopted models include suggestions for managing instructional design projects. However, these suggestions focus on how to manage the instructional design steps rather than the instructional design and development team process. The…

  16. Elections to Staff Council

    CERN Multimedia

    Saff Association

    2013-01-01

    2013 Elections to Staff Council   Vote! Make your voice heard and be many to elect the new Staff Council. More details on the elections can be found on the Staff Association web site (https://ap-vote.web.cern.ch/elections-2013).   Timetable elections Monday 28 October to Monday 11 November, 12:00 am voting Monday 18 and Monday 25 November, publication of the results in Echo Tuesday 19 November, Staff Association Assizes Tuesday 3 December, first meeting of the new Staff Council and election of the new Executive Committee The voting procedure is monitored by the Election Committee.

  17. 32 CFR 270.5 - Staff.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Staff. 270.5 Section 270.5 National Defense... Staff. (a) The Commission will have a support staff, which will include staff members sufficient to expeditiously and efficiently process the applications for payments under this part. All members of the staff...

  18. Leadership styles in nursing management: implications for staff outcomes

    Directory of Open Access Journals (Sweden)

    James Avoka Asamani

    2016-03-01

    Full Text Available Introduction: Nursing is a people-centred profession and therefore the issue of leadership is crucial for success. Nurse managers’ leadership styles are believed to be important determinant of nurses’ job satisfaction and retention. In the wake of a global nursing shortage, maldistribution of health workforce, increasing healthcare costs and expanding workload, it has become imperative to examine the role of nurse managers’ leadership styles on their staff outcomes. Using the Path-Goal Leadership theory as an organised framework, this study investigated the leadership styles of nurse managers and how they influence the nursing staff job satisfaction and intentions to stay at their current workplaces.Methods: The study employed a cross-sectional survey design to collect data from a sample of 273 nursing staff in five hospitals in the Eastern Region of Ghana. Descriptive and regression analyses were performed using SPSS version 18.0Results: Nurse managers used different leadership styles depending on the situation, but were more inclined to the supportive leadership style, followed by the achievement-oriented leadership style and participative leadership style. The nursing staff exhibited moderate levels of job satisfaction. The nurse managers’ leadership styles together explained 29% of the variance in the staff job satisfaction. The intention to stay at the current workplace was low (2.64 out of 5 among the nursing staff. More than half (51.7% of the nursing staff intended to leave their current workplaces, and 20% of them were actively seeking the opportunities to leave. The nurse managers’ leadership styles statistically explained 13.3% of the staff intention to stay at their current job position.Conclusions: These findings have enormous implications for nursing practice, management, education, and human resource for health policy that could lead to better staff retention and job satisfaction, and ultimately improve patient care.  

  19. Implementation of Effective Capstone Projects in Undergraduate Manufacturing Design Engineering Program

    Science.gov (United States)

    Viswanathan, Shekar

    2017-01-01

    Final program projects (capstone course) in manufacturing design engineering technology at National University are intensive experiences in critical thinking and analysis, designed to broaden students' perspectives and provide an opportunity for integration of coursework in the area of manufacturing design engineering. This paper focuses on three…

  20. Crossing the threshold: students' experiences of the transition from student to staff nurse

    OpenAIRE

    Draper, Janet; Sparrow, Shelagh; Gallagher, Donna

    2009-01-01

    This paper presents the findings of a Centre for Excellence in Teaching and Learning-funded project exploring the experience of student nurses making the transition from student to qualified nurse. \\ud \\ud The transition from student to staff nurse ‘is a common rite of passage that marks the end of initial educational preparation in the discipline and the beginning of the professional journey as a nurse’ (Nash et al, 2009: 49). However, the extent to which newly qualified staff nurses are abl...

  1. Management evolution in the LSST project

    Science.gov (United States)

    Sweeney, Donald; Claver, Charles; Jacoby, Suzanne; Kantor, Jeffrey; Krabbendam, Victor; Kurita, Nadine

    2010-07-01

    The Large Synoptic Survey Telescope (LSST) project has evolved from just a few staff members in 2003 to about 100 in 2010; the affiliation of four founding institutions has grown to 32 universities, government laboratories, and industry. The public private collaboration aims to complete the estimated $450 M observatory in the 2017 timeframe. During the design phase of the project from 2003 to the present the management structure has been remarkably stable. At the same time, the funding levels, staffing levels and scientific community participation have grown dramatically. The LSSTC has introduced project controls and tools required to manage the LSST's complex funding model, technical structure and distributed work force. Project controls have been configured to comply with the requirements of federal funding agencies. Some of these tools for risk management, configuration control and resource-loaded schedule have been effective and others have not. Technical tasks associated with building the LSST are distributed into three subsystems: Telescope & Site, Camera, and Data Management. Each sub-system has its own experienced Project Manager and System Scientist. Delegation of authority is enabling and effective; it encourages a strong sense of ownership within the project. At the project level, subsystem management follows the principle that there is one Board of Directors, Director, and Project Manager who have overall authority.

  2. The design and development of Project Warrior equipment

    International Nuclear Information System (INIS)

    Thompson, V.R.; Jerram, K.

    1987-01-01

    The project Warrior standing for welding and repair robot in Oldbury reactors is the culmination of more than 7 years of conceptual thinking, research, development design and manufacture. The tile encompasses the whole project which includes a work performing manipulator, serving manipulator, the manipulators control system and consoles, a welding head and rangefinder with its associated control system and consoles and a large amount of auxiliary equipment. The system at the forefront of today's technology has been manufactured to carry out remote welding in nuclear reactors, on plate with an oxide covering of up to 200 microns

  3. Industrial Sponsor Perspective on Leveraging Capstone Design Projects to Enhance Their Business

    Science.gov (United States)

    Weissbach, Robert S.; Snyder, Joseph W.; Evans, Edward R., Jr.; Carucci, James R., Jr.

    2017-01-01

    Capstone design projects have become commonplace among engineering and engineering technology programs. These projects are valuable tools when assessing students, as they require students to work in teams, communicate effectively, and demonstrate technical competency. The use of industrial sponsors enhances these projects by giving these projects…

  4. The Iodine Satellite (iSat) Project Development Towards Critical Design Review

    Science.gov (United States)

    Dankanich, John W.; Calvert, Derek; Kamhawi, Hani; Hickman, Tyler; Szabo, James; Byrne, Lawrence

    2015-01-01

    Despite the prevalence of small satellites in recent years, the systems flown to date have very limited propulsion capability. SmallSats are typically secondary payloads and have significant constraints for volume, mass, and power in addition to limitations on the use of hazardous propellants or stored energy. These constraints limit the options for SmallSat maneuverability. NASA's Space Technology Mission Directorate approved the iodine Satellite flight project for a rapid demonstration of iodine Hall thruster technology in a 12U (cubesat units) configuration under the Small Spacecraft Technology Program. The mission is a partnership between NASA MSFC, NASA GRC, and Busek Co, Inc., with the Air Force supporting the propulsion technology maturation. The team is working towards the critical design review in the final design and fabrication phase of the project. The current design shows positive technical performance margins in all areas. The iSat project is planned for launch readiness in the spring of 2017.

  5. A facility specialist model for improving retention of nursing home staff: results from a randomized, controlled study.

    Science.gov (United States)

    Pillemer, Karl; Meador, Rhoda; Henderson, Charles; Robison, Julie; Hegeman, Carol; Graham, Edwin; Schultz, Leslie

    2008-07-01

    This article reports on a randomized, controlled intervention study designed to reduce employee turnover by creating a retention specialist position in nursing homes. We collected data three times over a 1-year period in 30 nursing homes, sampled in stratified random manner from facilities in New York State and Connecticut and randomly assigned to treatment and control conditions. Staff outcomes were measured through certified nursing assistant interviews, and turnover rates were measured over the course of the year. In the intervention condition, a staff member was selected to be the facility retention specialist, who would advocate for and implement programs to improve staff retention and commitment throughout the facility. Retention specialists received an intensive 3-day training in retention leadership and in a number of evidence-based retention programs. Ongoing support was provided throughout the project. Treatment facilities experienced significant declines in turnover rates compared to control facilities. As predicted, we found positive effects on certified nursing assistant assessments of the quality of retention efforts and of care provided in the facility; we did not find effects for job satisfaction or stress. The study provides evidence for the effectiveness of the retention specialist model. Findings from a detailed process evaluation suggest modifications of the program that may increase program effects.

  6. Using simulation to educate hospital staff about casemix.

    Science.gov (United States)

    Cromwell, D A; Priddis, D; Hindle, D

    1998-10-01

    When the Australian government funded a casemix development program, few hospital clinicians or staff knew much about casemix classifications like Diagnosis Related Groups (DRGs). Although the concepts behind casemix are essentially simple, it is not a trivial task to explain the logic used to assign patients to classes, or the use of casemix data for management or funding. Therefore, as part of a project to create educational material, a computer-based management game, built around a simulation model of a hospital, was developed. The game was designed for use in a workshop setting, to allow participants to test their understanding of the casemix information presented to them. The simulation mimicked the operation of a hospital, with a player taking the role of a hospital manager. It aimed to demonstrate how AN-DRGs might be used for funding; how patient costs are influenced by hospital activity; and how casemix data can assist in monitoring the use of resources. The game, called Dragon, proved to be very successful, and is now distributed as part of the National Casemix Education series.

  7. Rapid E-learning Development Strategies and a Multimedia Project Design Model

    Science.gov (United States)

    Sözcü, Ömer Faruk; Ipek, Ismail

    2014-01-01

    The purpose of the study is to discuss e-learning design strategies which can be used for multimedia projects as a design model. Recent advances in instructional technologies have been found to be very important in the design of training courses by using rapid instructional design (ID) approaches. The approaches were developed to use in training…

  8. Staff development and library services in academic libraries in ...

    African Journals Online (AJOL)

    Staff development and library services in academic libraries in Bayelsa and Delta States. ... Information Impact: Journal of Information and Knowledge Management ... Descriptive survey research design was used for this study, data was ...

  9. Project Selection in the Design Studio: Absence of Learning Environments

    Science.gov (United States)

    Basa, Inci

    2010-01-01

    Project selection is an essential matter of design teaching. Based on observations of a specific curriculum, the author claims that a wide repertoire of subjects including offices, restaurants, hotels, and other public places are used to prepare design students, but that schools and other "learning environments/ schools" are similarly…

  10. High-gain capsule design for the HIDIF project

    International Nuclear Information System (INIS)

    Honrubia, J.J.; Cerrada, J.A.; Gomez, R.

    2000-01-01

    A high-gain capsule has been designed for the HIDIF project. The goal has been to relax the accelerator requirements by using a radiation pulse with lower peak temperature (220 eV) than previous designs (260 eV). The ablator material is beryllium doped with a very low concentration (0.2 atom %) of copper. The capsule absorbs 1.3 MJ and yields, approximately, 450 MJ in I-D simulations. The effect of the opacity of the ablator on capsule performance has been studied in detail. (authors)

  11. MEDICAL STAFF SCHEDULING USING SIMULATED ANNEALING

    Directory of Open Access Journals (Sweden)

    Ladislav Rosocha

    2015-07-01

    Full Text Available Purpose: The efficiency of medical staff is a fundamental feature of healthcare facilities quality. Therefore the better implementation of their preferences into the scheduling problem might not only rise the work-life balance of doctors and nurses, but also may result into better patient care. This paper focuses on optimization of medical staff preferences considering the scheduling problem.Methodology/Approach: We propose a medical staff scheduling algorithm based on simulated annealing, a well-known method from statistical thermodynamics. We define hard constraints, which are linked to legal and working regulations, and minimize the violations of soft constraints, which are related to the quality of work, psychic, and work-life balance of staff.Findings: On a sample of 60 physicians and nurses from gynecology department we generated monthly schedules and optimized their preferences in terms of soft constraints. Our results indicate that the final value of objective function optimized by proposed algorithm is more than 18-times better in violations of soft constraints than initially generated random schedule that satisfied hard constraints.Research Limitation/implication: Even though the global optimality of final outcome is not guaranteed, desirable solutionwas obtained in reasonable time. Originality/Value of paper: We show that designed algorithm is able to successfully generate schedules regarding hard and soft constraints. Moreover, presented method is significantly faster than standard schedule generation and is able to effectively reschedule due to the local neighborhood search characteristics of simulated annealing.

  12. Sampling design for use by the soil decontamination project

    International Nuclear Information System (INIS)

    Rutherford, D.W.; Stevens, J.R.

    1981-01-01

    This report proposes a general approach to the problem and discusses sampling of soil to map the contaminated area and to provide samples for characterizaton of soil components and contamination. Basic concepts in sample design are reviewed with reference to environmental transuranic studies. Common designs are reviewed and evaluated for use with specific objectives that might be required by the soil decontamination project. Examples of a hierarchial design pilot study and a combined hierarchial and grid study are proposed for the Rocky Flats 903 pad area

  13. Waste handling building design tradeoff studies: Salt Repository Project closeout task report

    International Nuclear Information System (INIS)

    1988-01-01

    The purpose of this closeout study is to capture work done by SRPO contractors and the relevant knowledge and recommendations of Battelle staff regarding design of WHB receiving, storage, hot cell areas, and process logistics. The information and recommendations are based on the latest available studies and prior experience of Battelle personnel at WIPP, INEL, and Hanford facilities. The information is expected to be directly applicable to WHB design work that will be done at Nevada, MRS, or other repository facilities. A perspective showing the various WHB areas and general arrangement is given. This study addresses alternatives associated with the receiving area, the fuel storage areas, the cell arrangements, the failed fuel accommodations, and the process logistics. 16 refs., 2 figs., 5 tabs

  14. Exploring organisational competences in Human Factors and UX project work: managing careers, project tactics and organisational strategy.

    Science.gov (United States)

    Furniss, Dominic; Curzon, Paul; Blandford, Ann

    2018-06-01

    Organisational competence in Human Factors and UX (user experience) has not been looked at before despite its relevance to project success. We define organisational competence as the collective competence of the individuals, bringing together their complementary abilities to deliver an outcome that is typically more than the sum of its parts. Twenty-two UX and Human Factors practitioners were interviewed about their project work in two contrasting domains: web design and safety-critical systems to explore organisational competences. Through doing a FRAM analysis, 29 functions and 6 main areas of competences were identified: the central project process; the process of learning about the problem; maintaining and developing client relations; staff development; evolving practices; and the management of documentation for audit and quality control. These dynamic and situated competences form a web of interactions. Managing competences is essential for project success. Implications for managing careers, project tactics and organisational strategy are discussed. Practitioner Summary: Organisational competences impact how routine and non-routine project work is performed, but these have received little attention in the literature. Six key areas of competences in Human Factors and UX project work were identified from practitioner interviews. Managing combinations of adaptive competences is important for developing careers, project tactics and organisational strategies.

  15. Conceptual design report, plutonium stabilization and handling,project W-460

    Energy Technology Data Exchange (ETDEWEB)

    Weiss, E.V.

    1997-03-06

    Project W-460, Plutonium Stabilization and Handling, encompasses procurement and installation of a Stabilization and Packaging System (SPS) to oxidize and package for long term storage remaining plutonium-bearing special nuclear materials currently in inventory at the Plutonium Finishing Plant (PFP), and modification of vault equipment to allow storage of resulting packages of stabilized SNM for up to fifty years. This Conceptual Design Report (CDR) provides conceptual design details for the vault modification, site preparation and site interface with the purchased SPS. Two concepts are described for vault configuration; acceleration of this phase of the project did not allow completion of analysis which would clearly identify a preferred approach.

  16. Closed and Open Design Projects in the Education of Engineers

    DEFF Research Database (Denmark)

    Franksen, Ole Immanuel

    1965-01-01

    The two aspects of engineering education are the teaching of science and the teaching of design. By ``design'' is meant the procedure of selecting and combining distinct elements to create complete systems which will perform useful functions. In this paper, the author describes the application of...... of this concept of design teaching at The Technical University of Denmark, after a procedure which includes a sequence of closed and open design projects in both computational and experimental laboratories...

  17. The Native Comic Book Project: native youth making comics and healthy decisions.

    Science.gov (United States)

    Montgomery, Michelle; Manuelito, Brenda; Nass, Carrie; Chock, Tami; Buchwald, Dedra

    2012-04-01

    American Indians and Alaska Natives have traditionally used stories and drawings to positively influence the well-being of their communities. The objective of this study was to describe the development of a curriculum that trains Native youth leaders to plan, write, and design original comic books to enhance healthy decision making. Project staff developed the Native Comic Book Project by adapting Dr. Michael Bitz's Comic Book Project to incorporate Native comic book art, Native storytelling, and decision-making skills. After conducting five train-the-trainer sessions for Native youth, staff were invited by youth participants to implement the full curriculum as a pilot test at one tribal community site in the Pacific Northwest. Implementation was accompanied by surveys and weekly participant observations and was followed by an interactive meeting to assess youth engagement, determine project acceptability, and solicit suggestions for curriculum changes. Six youths aged 12 to 15 (average age = 14) participated in the Native Comic Book Project. Youth participants stated that they liked the project and gained knowledge of the harmful effects of commercial tobacco use but wanted better integration of comic book creation, decision making, and Native storytelling themes. Previous health-related comic book projects did not recruit youth as active producers of content. This curriculum shows promise as a culturally appropriate intervention to help Native youth adopt healthy decision-making skills and healthy behaviors by creating their own comic books.

  18. Elections to Staff Council

    CERN Multimedia

    Staff Association

    2013-01-01

    Elections to fill all seats in the Staff Council are being organized this month. The voting takes place from the 28 of October to the 11th of November, at noon. As you may have noted when reading Echo, many issues concerning our employment conditions are on the agenda of the coming months, and in particular the Five-yearly-Review 2015, subject of the questionnaire that you probably recently filled out. All this will keep the next Staff Council very busy indeed. So, make your voice heard and take part in the elections for a new Staff Council. By doing so, you will be encouraging the men and women who will be representing you over the next two years and they will doubtless appreciate your gratitude. Every member of the Staff Association will have received an email containing a link to the webpage which will allow voting. If you are a member of the Staff Association and you did not receive such an email, please contact the Staff Association secretariat (staff.association@cern.ch). Do not forget to v...

  19. Research-Informed Curriculum Design for a Master's-Level Program in Project Management

    Science.gov (United States)

    Bentley, Yongmei; Richardson, Diane; Duan, Yanqing; Philpott, Elly; Ong, Vincent; Owen, David

    2013-01-01

    This article reports on the application of Research-Informed Curriculum Design (RICD) for the development and implementation of an MSc Program in Project Management. The research focused on contemporary issues in project management and provided an analysis of project management approaches, tools, and techniques currently used in organizations.…

  20. The SOLEIL project

    International Nuclear Information System (INIS)

    2001-01-01

    The SOLEIL project is built around an optimized 2,5 GeV positron storage ring with its own injector, i-e, a linear accelerator and a booster. This paper gathers information on the main characteristics of the project and more specially on the budget, the staff, the overall time table and a presentation of the Synchrotron Soleil Society. (A.L.B.)

  1. Sustainability and evidence-based design in the healthcare estate

    CERN Document Server

    Phiri, Michael

    2014-01-01

    This work aims to deepen our understanding of the role played by technical guidelines and tools for the design, construction and operation of healthcare facilities, ultimately establishing the impact of the physical environment on staff and patient outcomes. Using case studies largely drawn from the UK, Europe, China and Australasia, design approaches such as sustainability (e.g. targets for energy efficiency, carbon neutrality, reduction of waste), evidence-based design (EBD), and Post-Project Evaluation (PPE) are examined in order to identify policies, mechanisms and strategies that can promote an integrated learning environment that in turn supports innovation in healthcare.

  2. Improving Elderly's Dental Hygiene Through Nursing Home Staff's Dental Health Education at the Nursing Home

    OpenAIRE

    Santoso, Bedjo; Eko Ningtyas, Endah Aryati; Fatmasari, Diyah

    2017-01-01

    Stomatitis often occurs in elderly at nursing home. They need nursing home staff assistance to maintain their dental and oral health. Therefore, nursing home staff need dental health education. Lecture or discussion methods, which are more effective to improve knowledge, attitude and skill of nursing home staff was the purpose of this research. The research design was quasi-experiment research and pretest-posttest with control group. The sample was 42 nursing home staffs and 74 elderlies, div...

  3. Change Management for using a Project Website in Design Team Communication

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Emitt, S.; Prins, M.

    2005-01-01

    A Project Website (PWS) has been advocated as an important tool for design teams of construction projects, because the tool is supposed to greatly enhance team communication. This, finally, should result in improved team performance in terms of increase of efficiency and effectiveness. PWS vendors

  4. Implementing a Student-Designed Green Chemistry Laboratory Project in Organic Chemistry

    Science.gov (United States)

    Graham, Kate J.; Jones, T. Nicholas; Schaller, Chris P.; McIntee, Edward J.

    2014-01-01

    A multiweek organic chemistry laboratory project is described that emphasizes sustainable practices in experimental design. An emphasis on student-driven development of the project is meant to mirror the independent nature of research. Students propose environmentally friendly modifications of several reactions. With instructor feedback, students…

  5. Development of a medical staff recruitment system for teaching ...

    African Journals Online (AJOL)

    Development of a medical staff recruitment system for teaching hospitals in Nigeria. ... Nigeria, were visited and relevant information was collated through personal ... The design and development of the system employs 3-tier web architecture.

  6. Development and Evaluation of an Undergraduate Multidisciplinary Project Activity in Engineering and Design

    Science.gov (United States)

    Smith, David R.; Cole, Joanne

    2012-01-01

    The School of Engineering and Design Multidisciplinary Project (MDP) at Brunel University is a one week long project based activity involving first year undergraduate students from across the School subject areas of Electronic and Computer Engineering, Mechanical Engineering, Civil Engineering and Design. This paper describes the main aims of the…

  7. Impediments to User Gains: Experiences from a Critical Participatory Design Project

    DEFF Research Database (Denmark)

    Bossen, Claus; Dindler, Christian; Iversen, Ole Sejer

    2012-01-01

    interviews with participants in a project aimed at developing technology that fosters engaging museum experiences, and rethinking cultural heritage communication. Despite the use of established PD techniques by experienced PD practitioners, a significant number of frustrations relating to the PD process were...... prominent in the research study. Based on these findings, we provide an analysis of impediments for users gains in PD projects: Differences between aims were unresolved, absence of a shared set-up for collaboration and different conceptions of technology.......Actual studies of user gains from involvement in design processes are few, although a concern for users’ gains is a core characteristic of participatory design (PD). We explore the question of user gains through a retrospective evaluation of a critical PD project. We conducted ten qualitative...

  8. Preliminary Design Requirements Document for Project W-314

    Energy Technology Data Exchange (ETDEWEB)

    MCGREW, D.L.

    2000-04-27

    This document sets forth functional requirements, performance requirements, and design constraints for the tank farm systems elements identified in Section 3.1 of this document. These requirements shall be used to develop the Design Requirements Baseline for those system elements. System Overview--The tank farm system at Hanford Site currently consists of 149 single shell tanks and 28 double shell tanks with associated facilities and equipment, located in 18 separate groupings. Each grouping is known as a tank farm. They are located in the areas designated as 200 West and 200 East. Table 1-1 shows the number of tanks in each farm. The farms are connected together through a transfer system consisting of piping, diversion boxes, Double Contained Receiver Tanks (DCRT) and other miscellaneous facilities and elements. The tank farm system also connects to a series of processing plants which generate radioactive and hazardous wastes. The primary functions of the tank farm system are to store, transfer, concentrate, and characterize radioactive and hazardous waste generated at Hanford, until the waste can be safely retrieved, processed and dispositioned. The systems provided by Project W-314 support the store and transfer waste functions. The system elements to be upgraded by Project W-314 are identified in Section 3.1.

  9. Preliminary Design Requirements Document for Project W-314

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This document sets forth functional requirements, performance requirements, and design constraints for the tank farm systems elements identified in Section 3.1 of this document. These requirements shall be used to develop the Design Requirements Baseline for those system elements. System Overview--The tank farm system at Hanford Site currently consists of 149 single shell tanks and 28 double shell tanks with associated facilities and equipment, located in 18 separate groupings. Each grouping is known as a tank farm. They are located in the areas designated as 200 West and 200 East. Table 1-1 shows the number of tanks in each farm. The farms are connected together through a transfer system consisting of piping, diversion boxes, Double Contained Receiver Tanks (DCRT) and other miscellaneous facilities and elements. The tank farm system also connects to a series of processing plants which generate radioactive and hazardous wastes. The primary functions of the tank farm system are to store, transfer, concentrate, and characterize radioactive and hazardous waste generated at Hanford, until the waste can be safely retrieved, processed and dispositioned. The systems provided by Project W-314 support the store and transfer waste functions. The system elements to be upgraded by Project W-314 are identified in Section 3.1

  10. Salt Repository Project shaft design guide: Revision 0

    International Nuclear Information System (INIS)

    1987-12-01

    The Salt Repository Project (SRP) Shaft Design Guide (SDG) and the accompanying SRP Input to Seismic Design define the basic approach for developing appropriate shaft designs for a high-level nuclear waste repository in salt at a proposed site in Deaf Smith County, Texas. The SDG is based on current mining industry standards and practices enhanced to meet the special needs of an underground nuclear waste repository. It provides a common approach for design of both the exploratory and repository shafts. The SDG defines shaft lining and material concepts and presents methods for calculating the loads and displacements that will be imposed on lining structures. It also presents the methodology and formulae for sizing lining components. The SDG directs the shaft designer to sources of geoscience and seismic design data for the Deaf Smith County, Texas repository site. In addition, the SDG describes methods for confirming shaft lining design by means of computer analysis, and it discusses performance monitoring needs that must be considered in the design. 113 refs., 18 figs., 14 tabs

  11. Design thinking.

    Science.gov (United States)

    Brown, Tim

    2008-06-01

    In the past, design has most often occurred fairly far downstream in the development process and has focused on making new products aesthetically attractive or enhancing brand perception through smart, evocative advertising. Today, as innovation's terrain expands to encompass human-centered processes and services as well as products, companies are asking designers to create ideas rather than to simply dress them up. Brown, the CEO and president of the innovation and design firm IDEO, is a leading proponent of design thinking--a method of meeting people's needs and desires in a technologically feasible and strategically viable way. In this article he offers several intriguing examples of the discipline at work. One involves a collaboration between frontline employees from health care provider Kaiser Permanente and Brown's firm to reengineer nursing-staff shift changes at four Kaiser hospitals. Close observation of actual shift changes, combined with brainstorming and rapid prototyping, produced new procedures and software that radically streamlined information exchange between shifts. The result was more time for nursing, better-informed patient care, and a happier nursing staff. Another involves the Japanese bicycle components manufacturer Shimano, which worked with IDEO to learn why 90% of American adults don't ride bikes. The interdisciplinary project team discovered that intimidating retail experiences, the complexity and cost of sophisticated bikes, and the danger of cycling on heavily trafficked roads had overshadowed people's happy memories of childhood biking. So the team created a brand concept--"Coasting"--to describe a whole new category of biking and developed new in-store retailing strategies, a public relations campaign to identify safe places to cycle, and a reference design to inspire designers at the companies that went on to manufacture Coasting bikes.

  12. Radiation Exposure Reduction to Brachytherapy Staff By Using Remote Afterloading

    International Nuclear Information System (INIS)

    Attalla, E.M.

    2005-01-01

    The radiation exposures to the personnel staff from patients with brachytherapy implants in a brachytherapy service were reviewed. Exposures to the brachytherapy personnel, as determined by Thermoluminescence Dosimeter (TLD) monitors, indicates a four-fold reduction in exposures after the implantation of the use of remote afterloading devices. Quarterly TLD monitor data for seven quarters prior to the use of remote afterloading devices demonstrate an average projected annual dose equivalent to the brachytherapy staff of 2543 Μ Sv. After the implantation of the remote afterloading devices, the quarterly TLD monitor data indicate an average dose equivalent per person of 153 Μ Sv. This is 76% reduction in exposure to brachytherapy personnel with the use of these devices

  13. The Impact of the Bologna Process on Academic Staff in Ukraine

    Science.gov (United States)

    Shaw, Marta A.; Chapman, David W.; Rumyantseva, Nataliya L.

    2012-01-01

    Academic staff in Ukraine face a convergence of institutional and professional pressures precipitated by a national economic crisis, projected declines in enrolment and dramatic changes to institutional procedures as institutions implement the Bologna Process. This article examines the extent to which these pressures are reshaping the way academic…

  14. Sensing and collecting radioactive materials as a project to teach engineering design

    International Nuclear Information System (INIS)

    Drake, D.; Majdi, T.; Strack, J.

    2015-01-01

    The remote detection and isolation of radioactive materials is both a challenging engineering design project and a relevant issue given modern nuclear circumstances. This project is used in the undergraduate capstone class of the Engineering Physics Department at McMaster University to teach students engineering design. This paper discusses the course outline and learning outcomes of the students who took the course over the 2014-2015 academic year. (author)

  15. Sensing and collecting radioactive materials as a project to teach engineering design

    Energy Technology Data Exchange (ETDEWEB)

    Drake, D.; Majdi, T.; Strack, J., E-mail: draked2@mcmaster.ca [McMaster University, Hamiltion, ON (Canada); and others

    2015-07-01

    The remote detection and isolation of radioactive materials is both a challenging engineering design project and a relevant issue given modern nuclear circumstances. This project is used in the undergraduate capstone class of the Engineering Physics Department at McMaster University to teach students engineering design. This paper discusses the course outline and learning outcomes of the students who took the course over the 2014-2015 academic year. (author)

  16. Teaching Decision Making to Incarcerated Adults Using the Army's Staff Study as a Model.

    Science.gov (United States)

    Geraci-Johnson, Pauline M.

    1998-01-01

    The model of critical thinking in the Army Staff Study guide involves the following processes: schema, focus, pattern, extension, projection, and metacognition. It is adaptable to teaching in correctional settings. (SK)

  17. Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Connell, Daniel P

    2009-01-12

    the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.

  18. Participatory design facilitates Person Centred Nursing in service improvement with older people: a secondary directed content analysis.

    Science.gov (United States)

    Wolstenholme, Daniel; Ross, Helen; Cobb, Mark; Bowen, Simon

    2017-05-01

    To explore, using the example of a project working with older people in an outpatient setting in a large UK NHS Teaching hospital, how the constructs of Person Centred Nursing are reflected in interviews from participants in a Co-design led service improvement project. Person Centred Care and Person Centred Nursing are recognised terms in healthcare. Co-design (sometimes called participatory design) is an approach that seeks to involve all stakeholders in a creative process to deliver the best result, be this a product, technology or in this case a service. Co-design practice shares some of the underpinning philosophy of Person Centred Nursing and potentially has methods to aid in Person Centred Nursing implementation. The research design was a qualitative secondary Directed analysis. Seven interview transcripts from nurses and older people who had participated in a Co-design led improvement project in a large teaching hospital were transcribed and analysed. Two researchers analysed the transcripts for codes derived from McCormack & McCance's Person Centred Nursing Framework. The four most expressed codes were as follows: from the pre-requisites: knowing self; from care processes, engagement, working with patient's beliefs and values and shared Decision-making; and from Expected outcomes, involvement in care. This study describes the Co-design theory and practice that the participants responded to in the interviews and look at how the co-design activity facilitated elements of the Person Centred Nursing framework. This study adds to the rich literature about using emancipatory and transformational approaches to Person Centred Nursing development, and is the first study exploring explicitly the potential contribution of Co-design to this area. Methods from Co-design allow older people to contribute as equals in a practice development project, co-design methods can facilitate nursing staff to engage meaningfully with older participants and develop a shared

  19. CBE Faculty and Staff

    Science.gov (United States)

    About Us Research Staff Edward Arens Fred Bauman Gail Brager Darryl Dickerhoff Ali Ghahramani Partners Facilities Graduate Programs Visiting Scholar Program Careers CBE Faculty and Staff CBE is an performance of buildings. The core research group for CBE includes faculty and research staff members

  20. A new logo for the Staff Association

    CERN Multimedia

    Staff Association

    2013-01-01

    On 3rd December 2012 the Staff Association launched a competition open to all to design a new logo, which should not contain the official CERN logo, reserved by CERN’s new graphic charter to the official use by the Organization. We are pleased that this competition sparked a strong interest. A total of 57 proposals were received within the time limits, some submitted from far away: Poland, Czech Republic, Turkey and even Cameroon! The selection of the winning logo was made in two steps: first the pre-selection of six finalists, followed by the final choice of the winning logo by members of the Staff Association.  Winning logo The pre-selection was made in two stages. Three of the six finalists were nominated by a jury consisting of seven members of the Staff Association, including communication professionals. In parallel, from 4 to 15 February CERN employed members of the personnel were able to visit the exhibition of all the logo proposals on the 1st floor of the Main Building and ...

  1. Outsourced design services lessons learned from LHC civil engineering

    CERN Document Server

    Watson, T

    2003-01-01

    In April 1996 CERN awarded three contracts for the provision of civil engineering design and site supervision services associated with the LHC Project. These three contracts with an average value at signature of 12MCHF were placed using the “two envelope” award system. Eight firms from six member states were integrated into three Joint Ventures. For Projects prior to the LHC, CERN would have carried out the design and supervision using in-house staff. The change to out-sourced services represented a major step for CERN. After seven years, the contracts are now coming to their conclusion. This paper aims to discuss the reasons why these contracts were originally implemented, the lessons than have been learnt over the last seven years and conclusions on how CERN could approach the need for civil engineering design services in the future.

  2. A research project to encourage system-compatible design of end-use appliances

    International Nuclear Information System (INIS)

    Dorr, D.; Key, T.; Sitzlar, G.

    1995-01-01

    Cooperative system compatibility research sponsored by the Canadian Electrical Association (CEA) and the Electric Power Research Institute (EPRI) for improving appliance performance deficiencies was described. Power producer and end-user compatibility concerns was addressed through the development of a System Compatibility Research Project. A list of project tasks was provided. The CEA and EPRI initiated a project to establish flicker response of various lighting systems, which included physical tests. Results of this project were presented and discussed. The incentives for developing switch mode power supplies with enhanced immunity to voltage fluctuations and short interruptions was discussed. It was concluded that power quality studies currently underway will provide designers with a profile of the expected utility environment for their products. System compatibility research will identify areas that should be addressed by standards bodies so that designers can apply applicable criteria objectives early in the appliance design process. These efforts were expected to encourage appropriate manufacturer criteria for compatibility by convincing buyers and sellers that there is a real pay back for this investment. 13 refs., 6 figs., 4 tabs

  3. Design Project on Controlled-Release Drug Delivery Devices: Implementation, Management, and Learning Experiences

    Science.gov (United States)

    Xu, Qingxing; Liang, Youyun; Tong, Yen Wah; Wang, Chi-Hwa

    2010-01-01

    A design project that focuses on the subject of controlled-release drug delivery devices is presented for use in an undergraduate course on mass transfer. The purpose of the project is to introduce students to the various technologies used in the fabrication of drug delivery systems and provide a practical design exercise for understanding the…

  4. Research Staff | Wind | NREL

    Science.gov (United States)

    Research Staff Research Staff Learn more about the expertise and technical skills of the wind power research team and staff at NREL. Name Position Email Phone Anstedt, Sheri Professional III-Writer/Editor /Web Content Sheri.Anstedt@nrel.gov 303-275-3255 Baker, Donald Research Technician V-Electrical

  5. Feasibility, Design and Construction of a Small Hydroelectric Power Generation Station as a Student Design Project.

    Science.gov (United States)

    Peterson, James N.; Hess, Herbert L.

    An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…

  6. Staff Association Cocktail

    CERN Multimedia

    Staff Association

    2017-01-01

    The Staff Association has been organising for many years a cocktail with delegates of the Member States participating in Finance Committees of March and September. This cocktail is held at the end of the day, after the Finance Committee meeting. This direct and regular communication helps establish an ongoing contact between the Staff Association and CERN Member States and, more recently, the Associate Member States. Ambassadors of the CERN Staff Association, who are Members of the Personnel, have the opportunity to meet their national delegation in an informal and friendly atmosphere. These exchanges, facilitated by the use of the national language, allow the personnel via the Staff Association to express its ideas and positions on current affairs and fundamental issues, and also to hear about those of the delegations in return.

  7. Staff satisfaction and its components in residential aged care.

    Science.gov (United States)

    Chou, Shu-Chiung; Boldy, Duncan P; Lee, Andy H

    2002-06-01

    The purpose of this study was to assess the direction and magnitude of the effects among the components of staff satisfaction in residential aged care and to examine whether the relationships among satisfaction components vary according to facility type (i.e. nursing homes and hostels). A hostel is a low care facility in which residents are more independent, have a lower level of care needs, and receive personal but not nursing care. A cross-sectional survey design was adopted to collect the required information, and a stratified random sampling approach was utilized to select facilities. Structural equation modeling was used to examine relationships among satisfaction components. Seventy residential aged care facilities in Western Australia. The sample includes 610 nursing home and 373 hostel care staff. The relationships among satisfaction components are different for nursing home and hostel staff. Professional support is found to have a strong and positive effect on all other aspects of staff satisfaction. The findings lead to an improved understanding of the interrelationship among staff satisfaction components, which has important implications through enhancing professional support. This needs to be recognized and emphasized by managers, care providers, and policy makers so as to maintain stable personnel and continuity of care.

  8. Design requirements document for project W-520, immobilized low-activity waste disposal

    International Nuclear Information System (INIS)

    Ashworth, S.C.

    1998-01-01

    This design requirements document (DRD) identifies the functions that must be performed to accept, handle, and dispose of the immobilized low-activity waste (ILAW) produced by the Tank Waste Remediation System (TWRS) private treatment contractors and close the facility. It identifies the requirements that are associated with those functions and that must be met. The functional and performance requirements in this document provide the basis for the conceptual design of the Tank Waste Remediation System Immobilized Low-Activity Waste disposal facility project (W-520) and provides traceability from the program-level requirements to the project design activity

  9. Design requirements document for project W-520, immobilized low-activity waste disposal

    Energy Technology Data Exchange (ETDEWEB)

    Ashworth, S.C.

    1998-08-06

    This design requirements document (DRD) identifies the functions that must be performed to accept, handle, and dispose of the immobilized low-activity waste (ILAW) produced by the Tank Waste Remediation System (TWRS) private treatment contractors and close the facility. It identifies the requirements that are associated with those functions and that must be met. The functional and performance requirements in this document provide the basis for the conceptual design of the Tank Waste Remediation System Immobilized Low-Activity Waste disposal facility project (W-520) and provides traceability from the program-level requirements to the project design activity.

  10. Nursing staffs' emotional well-being and caring behaviours.

    Science.gov (United States)

    Chana, Navtej; Kennedy, Paul; Chessell, Zoë J

    2015-10-01

    To examine the relationships between structural factors (work stressors), individual factors (demographics and the personal resources of resilience and social support) and transactional factors (appraisals and coping), and nursing staffs' levels of burnout, psychological distress and caring behaviours. A further aim was to examine the relationships between nursing staffs' levels of burnout and psychological distress and their caring behaviours. Burnout and psychological distress levels have been found to be high in National Health Service nursing staff and furthermore this emotional distress has been found to affect patient care. In a National Health Service striving to provide high-quality patient-centred care, it is essential that factors affecting nursing staffs' well-being and their caring behaviours are examined. A cross-sectional correlation-based survey design. A sample of 102 nursing staff from an Acute National Health Service Trust were recruited in 2010. Participants completed the questionnaires: Nursing Stress Scale, Social Support Questionnaire-Short Form, Connor and Davidson Resilience Scale-2, Occupational Coping Self-Efficacy Scale for Nurses, PsychNurse Scale, Maslach Burnout Inventory, The Hospital Anxiety and Depression Scale and Caring Behaviours Inventory-revised. Due to the nonparametric nature of part of the data, Spearman's Rho correlations were used for analysis. Demographics were not found to be regularly correlated with nursing staffs' burnout, psychological distress or caring behaviours. Work stressors, coping strategies and self-efficacy were found to be significantly correlated with nursing staffs' burnout and psychological distress. Caring behaviours were also correlated with coping strategies and self-efficacy. Importantly, correlations were found between caring behaviours and nursing staffs' burnout and psychological distress. It is extremely important that the emotional well-being of nursing staff is supported, both for them, and

  11. Roles of Medical Record and Statistic Staff on Research at the Tawanchai Center.

    Science.gov (United States)

    Pattaranit, Rumpan; Chantachum, Vasana; Lekboonyasin, Orathai; Pradubwong, Suteera

    2015-08-01

    The medical record and statistic staffs play a crucial role behind the achievements of treatment and research of physicians, nurses and other health care professionals. The medical record and statistic staff are in charge of keeping patient medical records; creating databases; presenting information; sorting patient's information; providing patient medical records and related information for various medical teams and researchers; Besides, the medical record and statistic staff have collaboration with the Center of Cleft Lip-Palate, Khon Kaen University in association with the Tawanchai Project. The Tawanchai Center is an organization, involving multidisciplinary team which aims to continuing provide care for patients with cleft lip and palate and craniofacial deformities who need a long term of treatment since newborns until the age of 19 years. With support and encouragement from the Tawanchai team, the medical record and statistic staff have involved in research under the Tawanchai Centre since then and produced a number of publications locally and internationally.

  12. *Engr (Dr.) Egbuniwe is on the staff of Civil Engineering of the ...

    African Journals Online (AJOL)

    Dr Obe

    *Engr (Dr.) Egbuniwe is on the staff of Civil Engineering of the University of Nigeria, Nsukka. VARIATIONS IN THE STATISTICAL MEASURES OF MEAN RAINFALL. By. NNAMDI EGBUNIWE*. ABSTRACT. Rainfall records are required for planning and development of water resources projects. Long term averages of rainfall.

  13. Design review report: 200 East upgrades for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's 200 East (200E) Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314 is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farm waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first design package (AN Valve Pit Upgrades) was completed in November 1997, and the associated design verification activities are documented in HNF-1893. The second design package, 200 East (200E) Upgrades, was completed in March 1998. This design package identifies modifications to existing valve pits 241-AX-B and 241-A-B, as well as several new waste transfer pipelines to be constructed within the A Farm Complex of the 200E Area. The scope of the valve pit modifications includes new pit cover blocks, valve

  14. Canada: Darlington NPP. Project Control. Annex 4

    International Nuclear Information System (INIS)

    Wieckowski, G.

    1999-01-01

    This annex deals with project control. The just slowed down and delayed. Senior engineering, construction and procurement staff stayed with the project. Documentation was preserved though normal functioning of the records department project was completed and put into service with a few years' delay. (author)

  15. Computer software design description for the Treated Effluent Disposal Facility (TEDF), Project L-045H, Operator Training Station (OTS)

    International Nuclear Information System (INIS)

    Carter, R.L. Jr.

    1994-01-01

    The Treated Effluent Disposal Facility (TEDF) Operator Training Station (OTS) is a computer-based training tool designed to aid plant operations and engineering staff in familiarizing themselves with the TEDF Central Control System (CCS)

  16. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  17. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  18. Understanding the interface between clinical and laboratory staff

    Directory of Open Access Journals (Sweden)

    Ankie van den Broek

    2014-07-01

    Objectives: To propose a new conceptual model to gain insight and analyse factors that influence the laboratory–clinical staff interface. Methods: To develop the conceptual model, a literature study was performed, regulatory guidelines and standards for laboratories were analysed and discussions were held with experts on the topic. Result: A conceptual model and analytical framework provided good guidance in understanding and assessing the organisational and personal factors shaping the interface. The model was based on three elements: (1 the three phases of communication (pre-analytical, analytical and post-analytical; (2 the organisational and personal factors of interaction; and (3 the socio-political, economic and cultural context in which clinicians and laboratory staff operate. Conclusion: Assessment of the interface between clinicians and laboratory workers can be performed in a systematic way. Applying this model will provide information to managers of health institutions and heads of laboratories and clinical departments about what happens when clinicians and laboratory staff interact, thus aiding them in designing strategies to improve this interface.

  19. The Effects of Staff Training on Staff Confidence and Challenging Behavior in Services for People with Autism Spectrum Disorders

    Science.gov (United States)

    McDonnell, Andrew; Sturmey, Peter; Oliver, Chris; Cunningham, Joanna; Hayes, Samira; Galvin, Martin; Walshe, Caroline; Cunningham, Cathy

    2008-01-01

    The effects of a 3-day training course in the management of aggressive behavior in services for people with autism spectrum disorders were investigated using a quasi-experimental design. An experimental group received training over a 10-month period and a contrast group, which had received training before this study, did not. Staff training…

  20. Implementation of a campus-wide Irish hospital smoking ban in 2009: prevalence and attitudinal trends among staff and patients in lead up.

    LENUS (Irish Health Repository)

    Fitzpatrick, Patricia

    2012-02-01

    We report the evidence base that supported the decision to implement the first campus-wide hospital smoking ban in the Republic of Ireland with effect from 1 January 2009. Three separate data sources are utilized; surveillance data collected from patients and staff in 8 surveys between 1997 and 2006, a 1-week observational study to assess smoker behaviour in designated smoking shelters and an attitudinal interview with 28 smoker patients and 30 staff on the implications of the 2004 indoors workplace smoking ban, conducted in 2005. The main outcome measures were trends in prevalence of smoking over time according to age, sex and occupational groups and attitudes to the 2004 ban and a projected outright campus ban. Smoking rates among patients remained steady, 24.2% in 1997\\/98 and 22.7% in 2006. Staff smoking rates declined from 27.4% to 17.8%, with a strong occupational gradient. Observational evidence suggested a majority of those using smoking shelters in 2005 were women and health-care workers rather than patients. Attitudes of patients and staff were positive towards the 2004 ban, but with some ambivalence on the effectiveness of current arrangements. Staff particularly were concerned with patient safety issues associated with smoking outdoors. The 2004 ban was supported by 87.6% of patients and 81.3% of staff in 2006 and a majority of 58.6% of patients and 52.4% of staff agreed with an outright campus ban being implemented. These findings were persuasive in instigating a process in 2007\\/08 to go totally smoke-free by 2009, the stages for which are discussed.

  1. The experimental design of the Missouri Ozark Forest Ecosystem Project

    Science.gov (United States)

    Steven L. Sheriff; Shuoqiong. He

    1997-01-01

    The Missouri Ozark Forest Ecosystem Project (MOFEP) is an experiment that examines the effects of three forest management practices on the forest community. MOFEP is designed as a randomized complete block design using nine sites divided into three blocks. Treatments of uneven-aged, even-aged, and no-harvest management were randomly assigned to sites within each block...

  2. Factors impacting perceived safety among staff working on mental health wards.

    Science.gov (United States)

    Haines, Alina; Brown, Andrew; McCabe, Rhiannah; Rogerson, Michelle; Whittington, Richard

    2017-09-01

    Safety at work is a core issue for mental health staff working on in-patient units. At present, there is a limited theoretical base regarding which factors may affect staff perceptions of safety. This study attempted to identify which factors affect perceived staff safety working on in-patient mental health wards. A cross-sectional design was employed across 101 forensic and non-forensic mental health wards, over seven National Health Service trusts nationally. Measures included an online staff survey, Ward Features Checklist and recorded incident data. Data were analysed using categorical principal components analysis and ordinal regression. Perceptions of staff safety were increased by ward brightness, higher number of patient beds, lower staff to patient ratios, less dayroom space and more urban views. The findings from this study do not represent common-sense assumptions. Results are discussed in the context of the literature and may have implications for current initiatives aimed at managing in-patient violence and aggression. None. © The Royal College of Psychiatrists 2017. This is an open access article distributed under the terms of the Creative Commons Attribution (CC BY) license.

  3. AECB staff review of Bruce NGS 'A' operation for the year 1988

    International Nuclear Information System (INIS)

    1989-05-01

    AECB project staff believes that overall performance of the station in 1988 was generally satisfactory and better than in 1987. However, this assessment is not supported by some of the key performance indicators, although the indicators in areas where AECB staff had specific concerns do support it. For example, the percentage of reported significant events attributable to human error, the number of operating memos beyond the review date, scheduled emergency drills completed, the number of completed reactor trips all show a significant improvement over the 1987 value. In addition, AECB staff has been encouraged by the licensee's implementation of effective review processes for operator and maintenance call-ups, routines and deficiencies, and the establishment of supervisor inspection tours and operator rounds programs. Nevertheless, it is the opinion of AECB staff that to achieve standards of operation which would be considered fully satisfactory, the backlog of maintenance work must be reduced, the quality of work performed in the plant improved, and assurance provided that the required quality standards are being consistently achieved and maintained

  4. Project W-441 cold vacuum drying facility design requirements document

    International Nuclear Information System (INIS)

    O'Neill, C.T.

    1997-01-01

    This document has been prepared and is being released for Project W-441 to record the design basis for the design of the Cold Vacuum Drying Facility. This document sets forth the physical design criteria, Codes and Standards, and functional requirements that were used in the design of the Cold Vacuum Drying Facility. This document contains section 3, 4, 6, and 9 of the Cold Vacuum Drying Facility Design Requirements Document. The remaining sections will be issued at a later date. The purpose of the Facility is to dry, weld, and inspect the Multi-Canister Overpacks before transport to dry storage

  5. School Staff Perceptions of Well-Being and Experience of an Intervention to Promote Well-Being

    Science.gov (United States)

    Sharrocks, Louise

    2014-01-01

    An intervention was carried out with primary school staff to promote well-being with weekly sessions of a project which became known as Chill and Chat. Data were gathered via questionnaires completed before and after the project and from three focus groups (before, during and after the intervention), and were analysed using thematic analysis.…

  6. Research Staff | Photovoltaic Research | NREL

    Science.gov (United States)

    Research Staff Research Staff desc Greg Wilson Center Director Dr. Greg Wilson is the Director of @nrel.gov 303-384-6649 Bosco, Nicholas Staff Scientist Nick.Bosco@nrel.gov 303-384-6337 Braunecker, Wade IV-Physics Michael.Deceglie@nrel.gov 303-384-6104 Deline, Chris Staff Engineer Chris.Deline@nrel.gov

  7. VTAE Equity Staff Development Workshops and Services--Phase II. Final Report.

    Science.gov (United States)

    Baldus, Lorayne; Nelson, Orville

    The Phase II Equity Staff Development project was revised in response to a need to develop an equity strategic planning model with a vision statement, goals, and objectives. The Equity Strategic Planning Model was presented to administrators of Wisconsin Vocational, Technical, and Adult Education (VTAE) colleges for their use in district strategic…

  8. Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project

    International Nuclear Information System (INIS)

    Duckwitz, Noel

    2011-01-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets,' safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, 'Facility Safety,' and the expectations of DOE-STD-1189-2008, 'Integration of Safety into the Design Process,' provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  9. Environmental education essentials for project designers in Angola

    Directory of Open Access Journals (Sweden)

    Mbongo Mpaxi

    2015-05-01

    Full Text Available The article provides a selection of essential contents supporting environmental education of project designers in Angola. To attain such objective knowledge; abilities and values to be pursued are listed. The selection was completed by means of a thorough inquire based on the application of analysis and synthesis, historical, logical, inductive, deductive and system methods. The need of Angolan builders of knowing the environmental mpact of constructions is backed up. At the same time, the professional abilities allowing the future graduates to contribute o the preservation of environment during the stages of design, construction, exploitation and demolition of buildings is described.

  10. Application of Deterministic and Probabilistic System Design Methods and Enhancements of Conceptual Design Tools for ERA Project

    Science.gov (United States)

    Mavris, Dimitri N.; Schutte, Jeff S.

    2016-01-01

    This report documents work done by the Aerospace Systems Design Lab (ASDL) at the Georgia Institute of Technology, Daniel Guggenheim School of Aerospace Engineering for the National Aeronautics and Space Administration, Aeronautics Research Mission Directorate, Integrated System Research Program, Environmentally Responsible Aviation (ERA) Project. This report was prepared under contract NNL12AA12C, "Application of Deterministic and Probabilistic System Design Methods and Enhancement of Conceptual Design Tools for ERA Project". The research within this report addressed the Environmentally Responsible Aviation (ERA) project goal stated in the NRA solicitation "to advance vehicle concepts and technologies that can simultaneously reduce fuel burn, noise, and emissions." To identify technology and vehicle solutions that simultaneously meet these three metrics requires the use of system-level analysis with the appropriate level of fidelity to quantify feasibility, benefits and degradations, and associated risk. In order to perform the system level analysis, the Environmental Design Space (EDS) [Kirby 2008, Schutte 2012a] environment developed by ASDL was used to model both conventional and unconventional configurations as well as to assess technologies from the ERA and N+2 timeframe portfolios. A well-established system design approach was used to perform aircraft conceptual design studies, including technology trade studies to identify technology portfolios capable of accomplishing the ERA project goal and to obtain accurate tradeoffs between performance, noise, and emissions. The ERA goal, shown in Figure 1, is to simultaneously achieve the N+2 benefits of a cumulative noise margin of 42 EPNdB relative to stage 4, a 75 percent reduction in LTO NOx emissions relative to CAEP 6 and a 50 percent reduction in fuel burn relative to the 2005 best in class aircraft. There were 5 research task associated with this research: 1) identify technology collectors, 2) model

  11. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  12. Designing Facilities for Collaborative Operations

    Science.gov (United States)

    Norris, Jeffrey; Powell, Mark; Backes, Paul; Steinke, Robert; Tso, Kam; Wales, Roxana

    2003-01-01

    A methodology for designing operational facilities for collaboration by multiple experts has begun to take shape as an outgrowth of a project to design such facilities for scientific operations of the planned 2003 Mars Exploration Rover (MER) mission. The methodology could also be applicable to the design of military "situation rooms" and other facilities for terrestrial missions. It was recognized in this project that modern mission operations depend heavily upon the collaborative use of computers. It was further recognized that tests have shown that layout of a facility exerts a dramatic effect on the efficiency and endurance of the operations staff. The facility designs (for example, see figure) and the methodology developed during the project reflect this recognition. One element of the methodology is a metric, called effective capacity, that was created for use in evaluating proposed MER operational facilities and may also be useful for evaluating other collaboration spaces, including meeting rooms and military situation rooms. The effective capacity of a facility is defined as the number of people in the facility who can be meaningfully engaged in its operations. A person is considered to be meaningfully engaged if the person can (1) see, hear, and communicate with everyone else present; (2) see the material under discussion (typically data on a piece of paper, computer monitor, or projection screen); and (3) provide input to the product under development by the group. The effective capacity of a facility is less than the number of people that can physically fit in the facility. For example, a typical office that contains a desktop computer has an effective capacity of .4, while a small conference room that contains a projection screen has an effective capacity of around 10. Little or no benefit would be derived from allowing the number of persons in an operational facility to exceed its effective capacity: At best, the operations staff would be underutilized

  13. AECB staff annual report of Pickering NGS for the year 1991

    International Nuclear Information System (INIS)

    1992-11-01

    The AECB Pickering project staff, in cooperation with AECB staff in Ottawa, monitor the operation of Pickering NGS-A units 1-4 and Pickering NGS-B units 5-8 to ensure that Ontario Hydro operates the station in compliance with the licensing and safety requirements of the Atomic Energy Control Board. This report presents the review of licensing issues and station performance during 1991. Improvement over 1990 station operation occurred in the following areas: availability of special safety systems; reduction of the station external dose; reorganization of station management to improve focus; station chemistry; housekeeping and material condition; fuel handling capability; training of operators and maintenance staff. However, little change occurred and improvement is still needed in the following: compliance with operating licence; system surveillance program; station maintenance; environmental qualification; radiation emergency response; fire and rescue emergency response; limited capability to predict and prevent equipment failures such as the boiler tube failure on unit 5. (L.L.)

  14. Project design of an open pit colliery in Terkidag, Turkey

    Directory of Open Access Journals (Sweden)

    H. Kose

    2010-10-01

    Full Text Available In this manuscript, first of all, the status of Turkey in terms of energy production and consumption is given and the need to relyon domestic sources, namely lignite deposits, is emphasized rather than importing fuels from abroad. Then, a thorough literature workconcerning open pit design and production planning is explained in detail. On this basis, the project design and production planningof Tekirdag-Saray open pit colliery are conducted. According to the selected production technique, machinery-equipment that willbe utilized in the coal winning system is determined and in the final part, the investment cost and unit production cost regardingthe project are computed and the importance of constructing a power plant in the region operating with domestic fuels is expressed.

  15. Results From a Channel Restoration Project: Hydraulic Design Considerations

    Science.gov (United States)

    Karle, K.F.; Densmore, R.V.; ,

    2001-01-01

    Techniques for the hydraulic restoration of placer-mined streams and floodplains were developed in Denali National Park and Preserve, Alaska. The two-year study at Glen Creek focused on a design of stream and floodplain geometry using hydraulic capacity and shear stress equations. Slope and sinuosity values were based on regional relationships. Design requirements included a channel capacity for a bankfull discharge and a floodplain capacity for a 1.5- to 100-year discharge. Several bio-engineering techniques using alder and willow, including anchored brush bars, streambank hedge layering, seedlings, and cuttings, were tested to dissipate floodwater energy and encourage sediment deposition until natural revegetation stabilized the new floodplains. Permanently monumented cross-sections installed throughout the project site were surveyed every one to three years. Nine years after the project began, a summer flood caused substantial damage to the channel form, including a change in width/depth ratio, slope, and thalweg location. Many of the alder brush bars were heavily damaged or destroyed, resulting in significant bank erosion. This paper reviews the original hydraulic design process, and describes changes to the channel and floodplain geometry over time, based on nine years of cross-section surveys.

  16. Librarians as Interior Designers: The Icing on the Cake (Profile of a Community College LRC: Palomar College).

    Science.gov (United States)

    Arnsan, Dan

    1985-01-01

    Describes how staff at Palomar College Library participated in planning the interior of the library building in areas such as designing the floor plans, writing furniture specifications, choosing colors, and making structural changes in the facility. Offers advice for other librarians participating in building projects. (DMM)

  17. Designing a Successful Transportation Project: Lessons Learned from the Clean Cities American Recovery and Reinvestment Act Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, K.; Singer, M.

    2017-09-01

    The largest source of funding for alternative fuel vehicle and infrastructure projects in the U.S. Department of Energy's Clean Cities program's history came from the American Recovery and Reinvestment Act (Recovery Act). In 2009, the 25 cost-share projects totaled nearly $300 million in federal government investment. This effort included the involvement of 50 Clean Cities coalitions and their nearly 700 stakeholder partners who provided an additional $500 million in matching funds to support projects in their local communities. In total, those 25 projects established 1,380 alternative fueling stations and put more than 9,000 alternative fuel and advanced technology vehicles on the road. Together, these projects displaced 154 million gasoline gallon equivalents (GGE) of petroleum and averted 254,000 tons of greenhouse gas (GHG) emissions, while supporting U.S. energy independence and contributing to regional economic development. During post-project interviews, project leaders consistently cited a number of key components - ranging from technical and logistical factors, to administrative capabilities - for accomplishing an effective and impactful project. This report summarizes the high-level project design and administrative considerations for conducting a successful transportation project.

  18. Designing a Successful Transportation Project: Lessons Learned from the Clean Cities American Recovery and Reinvestment Act Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, Kay L. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Singer, Mark R. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-09-28

    The largest source of funding for alternative fuel vehicle and infrastructure projects in the U.S. Department of Energy's Clean Cities program's history came from the American Recovery and Reinvestment Act (Recovery Act). In 2009, the 25 cost-share projects totaled nearly $300 million in federal government investment. This effort included the involvement of 50 Clean Cities coalitions and their nearly 700 stakeholder partners who provided an additional $500 million in matching funds to support projects in their local communities. In total, those 25 projects established 1,380 alternative fueling stations and put more than 9,000 alternative fuel and advanced technology vehicles on the road. Together, these projects displaced 154 million gasoline gallon equivalents (GGE) of petroleum and averted 254,000 tons of greenhouse gas (GHG) emissions, while supporting U.S. energy independence and contributing to regional economic development. During post-project interviews, project leaders consistently cited a number of key components - ranging from technical and logistical factors, to administrative capabilities - for accomplishing an effective and impactful project. This report summarizes the high-level project design and administrative considerations for conducting a successful transportation project.

  19. DESIGN VERIFICATION REPORT SPENT NUCLEAR FUEL (SNF) PROJECT CANISTER STORAGE BUILDING (CSB)

    International Nuclear Information System (INIS)

    BAZINET, G.D.

    2003-01-01

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Revision 3 of this document incorporates MCO Cover Cap Assembly welding verification activities. Verification activities for the installed and operational SSCs have been completed

  20. Design of the compressor/stretcher ring of the Japanese Hadron Project

    International Nuclear Information System (INIS)

    Ohmori, C.; Noda, A.; Kimiya, Y.; Kihara, M.; Yamane, I.

    1991-01-01

    A possibility of adopting a racetrack-type design for the compressor/stretcher ring of the Japanese Hadron Project is described. This design has two long straight sections to enable to inject the H - beam and to produce a high β point for the slow extraction. (author)

  1. Design of the compressor/stretcher ring of the Japanese Hadron Project

    International Nuclear Information System (INIS)

    Ohmori, C.; Noda, A.; Kamiya, Y.; Kihara, M.; Yamane, I.

    1991-02-01

    A possibility of adopting a racetrack-type design for the compressor/stretcher ring of the Japanese Hadron Project is described. This design has two long straight sections to enable to inject the H - beam and to produce a high β point for the slow extraction. (author)

  2. Vitrification process equipment design for the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Chapman, C.C.; Drosjack, W.P.

    1988-10-01

    The vitrification process and equipment design is nearing completion for the West Valley Project. This report provides the basis and current status for the design of the major vessels and equipment within the West Valley Vitrification Plant. A review of the function and key design features of the equipment is also provided. The major subsystems described include the feed preparation and delivery systems, the melter, the canister handling systems, and the process off-gas system. 11 refs., 33 figs., 4 tabs

  3. Cultivation of students' engineering designing ability based on optoelectronic system course project

    Science.gov (United States)

    Cao, Danhua; Wu, Yubin; Li, Jingping

    2017-08-01

    We carry out teaching based on optoelectronic related course group, aiming at junior students majored in Optoelectronic Information Science and Engineering. " Optoelectronic System Course Project " is product-designing-oriented and lasts for a whole semester. It provides a chance for students to experience the whole process of product designing, and improve their abilities to search literature, proof schemes, design and implement their schemes. In teaching process, each project topic is carefully selected and repeatedly refined to guarantee the projects with the knowledge integrity, engineering meanings and enjoyment. Moreover, we set up a top team with professional and experienced teachers, and build up learning community. Meanwhile, the communication between students and teachers as well as the interaction among students are taken seriously in order to improve their team-work ability and communicational skills. Therefore, students are not only able to have a chance to review the knowledge hierarchy of optics, electronics, and computer sciences, but also are able to improve their engineering mindset and innovation consciousness.

  4. Protection of staff in interventional radiology

    International Nuclear Information System (INIS)

    Melkamu, M. A.

    2013-04-01

    This project focuses on the interventional radiology. The main objective of this project work was to provide a guidance and advice for occupational exposure and hospital management to optimize radiation protection safety and endorse safety culture. It provides practical information on how to minimize occupational exposure in interventional radiology. In the literature review all considerable parameters to reduce dose to the occupationally exposed are well discussed. These parameters include dose limit, risk estimation, use of dosimeter, personal dose record keeping, analysis of surveillance of occupational dose, investigation levels, and proper use of radiation protection tools and finally about scatter radiation dose rate. In addition the project discusses the ways to reduce occupational exposure in interventional radiology. The methods for dose reduction are minimizing fluoroscopic time, minimizing the number of fluoroscopic image, use of patient dose reduction technologies, use of collimation, planning interventional procedures, positioning in low scattered areas, use of protective shielding, use of appropriate fluoroscopic imaging equipment, giving training for the staff, wearing the dosimeters and know their own dose regularly, and management commitment to quality assurance and quality control system and optimization of radiation protection of safety. (author)

  5. Implementation of a Project-Based Telecommunications Engineering Design Course

    Science.gov (United States)

    Aliakbarian, Hadi; Soh, Ping Jack; Farsi, Saeed; Xu, Hantao; Van Lil, Emmanuel H. E. M. J. C.; Nauwelaers, Bart K. J. C.; Vandenbosch, Guy A. E.; Schreurs, Dominique M. M.-P.

    2014-01-01

    This paper describes and discusses the implementation of a project-based graduate design course in telecommunications engineering. This course, which requires a combination of technical and soft skills for its completion, enables guided independent learning (GIL) and application of technical knowledge acquired from classroom learning. Its main…

  6. The Staff Association and you

    CERN Multimedia

    Association du personnel

    2013-01-01

    The Staff Association, your representative with the Management and the Member States The article VII 1.01 of the Staff Rules and Regulations (SR&R) provides that “the relations between the Director-General and the personnel shall be established either on an individual basis or on a collective basis with the Staff Association as intermediary”. This essential role of the Staff representatives, of being the spokesperson of the entire staff of the Organization vis-à-vis the Director-General and the Members States, is achieved through regular participation in the various joint advisory committees defined in the SR&R. The most important are the Standing Concertation Committee and the TREF, tripartite forum where your representatives meet with the Member States delegates, in the presence of the Management, to explain the position of the staff on the various issues concerning employment conditions. The Finance Committee also gives the opportunity to the Staff Association to ...

  7. Overview of implementing a project control system in the nuclear utility industry

    International Nuclear Information System (INIS)

    Cooprider, D.H.

    1994-01-01

    During the late 1980s, a metamorphosis began at Florida Power and Light Company (FPL). A strategic step in nuclear engineering's efforts to become more cost effective began in January 1990. A project control department was formed. The initial mission was to provide support for nuclear engineering design activities associated with FPL's two twin-unit nuclear power generation facilities - Turkey Point and St. Lucie. Later, the goal expanded to include the division's materials management, nuclear licensing, and information management departments. The project control group was organized along the lines of the organizations served. Separate dedicated groups were established for each plant. Since most engineering activity was based at the Juno Beach headquarters, the project control staff also was based there

  8. A social building? Prison architecture and staff-prisoner relationships

    NARCIS (Netherlands)

    Beijersbergen, K. A.; Dirkzwager, A. J. E.; van der Laan, P. H.; Nieuwbeerta, P.

    2016-01-01

    Relationships between correctional officers and prisoners are crucial to life in prison, and affect prison order and prisoners' well-being. Research on factors influencing staff-prisoner relationships is scarce and has not included the design of prison buildings. This study examined the association

  9. Staff Assist: A Resource to Improve Nursing Home Quality and Staffing

    Science.gov (United States)

    Castle, Nicholas G.

    2011-01-01

    Purpose: This study describes the creation and use of a web-based resource, designed to help nursing homes implement quality improvements through changes in staffing characteristics. Design and Methods: Information on staffing characteristics (i.e., staffing levels, turnover, stability, and use of agency staff), facility characteristics (e.g.,…

  10. Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Saurwein, John

    2011-07-15

    This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

  11. Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

    International Nuclear Information System (INIS)

    Saurwein, J.

    2011-01-01

    This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

  12. Successful Training Development and Implementation in Plant Modernization Projects

    International Nuclear Information System (INIS)

    Kuhn, A.; Schoenfelder, C.

    2012-01-01

    In plant modernization projects, for life extension or power update, the competence development (in particular, job and needs oriented training) of the plant staff plays an important role for ensuring the highest standard of nuclear safety, and for facilitating an economic operation of the plant. This paper describes challenges, methodology, activities, and results obtained so far from an on-going project in Sweden. - - As conclusion, critical factors for a successful staff training in plant modernization projects include a systematic approach to training, a dedicated training management team, and good interfaces between supplier's engineering teams, experienced training providers, and equipment suppliers.

  13. Exploring an innovation project as source of change in organization design

    DEFF Research Database (Denmark)

    Brix, Jacob; Peters, Lois S.

    2015-01-01

    This study builds new empirically based theory on how the processing of an innovation project with a high degree of uncertainty induces change in key components in organization design. By using an embedded case study as our research strategy and organisation design theory as our analytical lens, we...

  14. Using Contact Theory to Assess Staff Perspectives on Training Initiatives of an Intergenerational Programming Intervention.

    Science.gov (United States)

    Weaver, Raven H; Naar, Jill J; Jarrott, Shannon E

    2017-12-25

    Project TRIP (Transforming Relationships through Intergenerational Programs) was developed as a sustainable intergenerational community project involving child care participants and elders attending an elder care program or volunteering at the children's program. The project focused on staff development of evidence-based intergenerational practices. To enhance available intervention research, contact theory provided a theoretical framework to explore how staff members' and administrators' perceptions of the intervention influenced their ability to implement programming in social care settings. We used a directed content analysis approach to analyze small group and individual interviews with 32 participants from 6 program sites over 5 years. Participants highlighted inherent challenges and subsequent benefits of academic-community partnerships. Greater on-site presence, open communication, and relationship-building proved critical to improve community partnerships, project fidelity, and program sustainability. When interactions reflected contact theory tenets, collaborators reported positive attitudes toward and interactions with research partners. Contact theory provided a useful framework to understand the researcher-practitioner partnership. Researchers should plan for partnerships that: (a) are supported by authority figures, including staff and participants, (b) utilize a shared expertise approach where partners have equal group status, (c) involve close cooperation; (d) align research and program goals, and (e) foster positive communication through frequent contact using practitioners' preferred methods and including in-person contact. We recommend future intergenerational programming interventions build on a foundation of both theory and practice. © The Author(s) 2017. Published by Oxford University Press on behalf of The Gerontological Society of America. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  15. A proposed framework for conducting pollution prevention design assessments (P2DAs) on U.S. Department of Energy design projects

    International Nuclear Information System (INIS)

    Dorsey, J.A.

    1995-03-01

    The purpose of this manual is to provide a framework for project managers, engineers, and designers to integrate pollution prevention principles and features into DOE design projects. The framework suggested is referred to as the pollution prevention design assessment (P2DA). The P2DA is based on DOE's method for conducting pollution prevention opportunity assessments (PPOAs) on existing waste-generating operations, but the P2DA is modified because the facility or process it assesses does not physically exist during design. Before the P2DA framework is introduced in the manual, recommendations for establishing the P2DA team and budget are provided. Specific pollution prevention requirements and opportunities for each design stage as delineated in DOE Order 4700.1 Project Management System are also discussed and a sample format for drafting a P2DA report is provided in the appendix. The scope of this manual includes not only the P2DA framework, but also a background discussion of pollution prevention and related topics; the regulatory requirements mandating design for pollution prevention; the benefits and barriers of designing for pollution prevention; and the impact that pollution prevention and related environmental avoidance concepts have had on the engineering profession

  16. Opinion and knowledge among hospital medical staff regarding diagnosis of diabetes and proper usage of a specific test tube for glucose analysis.

    Science.gov (United States)

    Bar-Dayan, Y; Bogaiov, A; Boaz, M; Landau, Z; Wainstein, J

    2014-02-01

    Accuracy of blood sugar values, as examined by glucose analysis, has significant importance on the diagnosis of diabetes and follow up of diabetes treatment. Usage of a designated test tube significantly improves the accuracy of measurement. Knowledge of the medical staff is a major determinant in the current usage of such a technology. The aim of the study was to assess the level of knowledge exhibited by medical staff in the diabetes field and specifically for the usage of a designated tube to test blood glucose level. A prospective study. The staff of the internal and surgical departments and outpatient clinics at the Wolfson Medical Center completed a questionnaire that assessed the level of knowledge about the designated glucose test tube, other randomly used test tubes, the parameters that influence the blood glucose values in a non-designated tube and the diagnosis of diabetes. A number of 160 questionnaires (50% from internal departments, 36% from surgical departments and 14% from outpatient clinics) were analysed. The majority of the staff members (65%) knew that diabetes is diagnosed by glucose levels in blood. Of the 35% that did not know, 91% were nurses. The majority (75%) knew that diabetes is diagnosed during fasting conditions; however, most of the staff indicated that 12 h is needed. Only 25% knew of the designated test tube, and most of the staff indicated that a regular chemistry tube was the tube of choice for them. The staff exhibited poor level of knowledge regarding the parameters that influence the quality of the test. Staff members are not aware of the various aspects of diabetes diagnosis and the designated test tube for glucose measurements, and most of them use a tube that gives inaccurate measurements, therefore there is an urgent need to improve diabetes knowledge among staff members. © 2013 John Wiley & Sons Ltd.

  17. Design and development of an intelligent nursing bed - a pilot project of "joint assignment".

    Science.gov (United States)

    Jiehui Jiang; Tingwei Liu; Yuting Zhang; Yu Song; Mi Zhou; Xiaosong Zheng; Zhuangzhi Yan

    2017-07-01

    The "joint assignment" is a creative bachelor education project for Biomedical Engineering (BME) in Shanghai University (SHU), China. The objective of this project is to improve students' capabilities in design thinking and teamwork through practices in the process of the design and development of complex medical product. As the first step, a pilot project "design and development of intelligent nursing bed" was set up in May 2015. This paper describes details of how project organization and management, various teaching methods and scientific evaluation approaches were achieved in this pilot project. For example, a method containing one main line and four branches is taken to manage the project and "prototyping model" was used as the main research approach. As a result a multi-win situation was achieved. The results showed, firstly, 62 bachelor students including 16 BME students were well trained. They improved themselves in use of practical tools, communication skills and scientific writing; Secondly, commercial companies received a nice product design on intelligent nursing bed, and have been working on industrializing it; Thirdly, the university and associated schools obtained an excellent practical education experience to supplement traditional class education; Fourthly and most importantly, requirements from end-users will be met. The results also showed that the "joint assignment" task could become a significant component in BME bachelor education.

  18. Fuzzy based method for project planning of the infrastructure design for the diagnostic in ITER

    International Nuclear Information System (INIS)

    Piros, Attila; Veres, Gábor

    2013-01-01

    The long-term design projects need special preparation before the start of the execution. This preparation usually includes the drawing of the network diagram for the whole procedure. This diagram includes the time estimation of the individual subtasks and gives us information about the predicted dates of the milestones. The calculated critical path in this network characterizes a specific design project concerning to its duration very well. Several methods are available to support this step of preparation. This paper describes a new method to map the structure of the design process and clarify the milestones and predict the dates of these milestones. The method is based on the PERT (Project Evaluation and Review Technique) network but as a novelty it applies fuzzy logic to find out the concerning times in this graph. With the application of the fuzzy logic the handling of the different kinds of design uncertainties becomes feasible. Many kinds of design uncertainties exist from the possible electric blackout up to the illness of an engineer. In many cases these uncertainties are related with human errors and described with linguistic expressions. The fuzzy logic enables to transform these ambiguous expressions into numeric values for further mathematical evaluation. The method is introduced in the planning of the design project of the infrastructure for the diagnostic systems of ITER. The method not only helps the project in the planning phase, but it will be a powerful tool in mathematical modeling and monitoring of the project execution

  19. Fuzzy based method for project planning of the infrastructure design for the diagnostic in ITER

    Energy Technology Data Exchange (ETDEWEB)

    Piros, Attila, E-mail: attila.piros@gt3.bme.hu [Department of Machine and Product Design, Budapest University of Technology and Economics, Budapest (Hungary); Veres, Gábor [Department of Plasma Physics, Wigner Research Centre for Physics, Hungarian Academy of Sciences, Budapest (Hungary)

    2013-10-15

    The long-term design projects need special preparation before the start of the execution. This preparation usually includes the drawing of the network diagram for the whole procedure. This diagram includes the time estimation of the individual subtasks and gives us information about the predicted dates of the milestones. The calculated critical path in this network characterizes a specific design project concerning to its duration very well. Several methods are available to support this step of preparation. This paper describes a new method to map the structure of the design process and clarify the milestones and predict the dates of these milestones. The method is based on the PERT (Project Evaluation and Review Technique) network but as a novelty it applies fuzzy logic to find out the concerning times in this graph. With the application of the fuzzy logic the handling of the different kinds of design uncertainties becomes feasible. Many kinds of design uncertainties exist from the possible electric blackout up to the illness of an engineer. In many cases these uncertainties are related with human errors and described with linguistic expressions. The fuzzy logic enables to transform these ambiguous expressions into numeric values for further mathematical evaluation. The method is introduced in the planning of the design project of the infrastructure for the diagnostic systems of ITER. The method not only helps the project in the planning phase, but it will be a powerful tool in mathematical modeling and monitoring of the project execution.

  20. Final design review report for K basin dose reduction project

    International Nuclear Information System (INIS)

    Blackburn, L.D.

    1996-01-01

    The strategy for reducing radiation dose originating from radionuclides absorbed in the K East Basin concrete is to raise the pool water level to provide additional shielding. This report documents a final design review for cleaning/coating basin walls and modifying other basin components where appropriate. The conclusion of this review was that the documents developed constitute an acceptable design for the Dose Reduction Project

  1. Implementation of an Industrial-Based Case Study as the Basis for a Design Project in an Introduction to Mechanical Design Course

    Science.gov (United States)

    Lackey, Ellen

    2011-01-01

    The purpose of this paper is to discuss the implementation of an industrial-based case study as the basis for a design project for the Spring 2009 Introduction to Mechanical Design Course at the University of Mississippi. Course surveys documented the lack of student exposure in classes to the types of projects typically experienced by engineers…

  2. Supplemental design requirements document enhanced radioactive and mixed waste storage Phase V Project W-112

    International Nuclear Information System (INIS)

    Ocampo, V.P.; Boothe, G.F.; Greager, T.M.; Johnson, K.D.; Kooiker, S.L.; Martin, J.D.

    1994-11-01

    This document provides additional and supplemental information to WHC-SD-W112-FDC-001, Project W-112 for radioactive and mixed waste storage. It provides additional requirements for the design and summarizes Westinghouse Hanford Company key design guidance and establishes the technical baseline agreements to be used for definitive design of the Project W-112 facilities

  3. SEISMIC DESIGN REQUIREMENTS SELECTION METHODOLOGY FOR THE SLUDGE TREATMENT and M-91 SOLID WASTE PROCESSING FACILITIES PROJECTS

    International Nuclear Information System (INIS)

    RYAN GW

    2008-01-01

    In complying with direction from the U.S. Department of Energy (DOE), Richland Operations Office (RL) (07-KBC-0055, 'Direction Associated with Implementation of DOE-STD-1189 for the Sludge Treatment Project,' and 08-SED-0063, 'RL Action on the Safety Design Strategy (SDS) for Obtaining Additional Solid Waste Processing Capabilities (M-91 Project) and Use of Draft DOE-STD-I 189-YR'), it has been determined that the seismic design requirements currently in the Project Hanford Management Contract (PHMC) will be modified by DOE-STD-1189, Integration of Safety into the Design Process (March 2007 draft), for these two key PHMC projects. Seismic design requirements for other PHMC facilities and projects will remain unchanged. Considering the current early Critical Decision (CD) phases of both the Sludge Treatment Project (STP) and the Solid Waste Processing Facilities (M-91) Project and a strong intent to avoid potentially costly re-work of both engineering and nuclear safety analyses, this document describes how Fluor Hanford, Inc. (FH) will maintain compliance with the PHMC by considering both the current seismic standards referenced by DOE 0 420.1 B, Facility Safety, and draft DOE-STD-1189 (i.e., ASCE/SEI 43-05, Seismic Design Criteria for Structures, Systems, and Components in Nuclear Facilities, and ANSI ANS 2.26-2004, Categorization of Nuclear Facility Structures, Systems and Components for Seismic Design, as modified by draft DOE-STD-1189) to choose the criteria that will result in the most conservative seismic design categorization and engineering design. Following the process described in this document will result in a conservative seismic design categorization and design products. This approach is expected to resolve discrepancies between the existing and new requirements and reduce the risk that project designs and analyses will require revision when the draft DOE-STD-1189 is finalized

  4. Analysis of French (Paluel) pressurized water reactor design differences compared to current US PWR designs

    International Nuclear Information System (INIS)

    1986-05-01

    To understand better the regulatory approaches to reactor safety in foreign countries, the staff of the Nuclear Regulatory Commisssion has reviewed design information on the Paluel nuclear power plant, one of the current standard 1300-MWe plant operating in France. This report provides the staff's evaluation of major design differences between this standardized French plant and current US pressurized water reactor plants, as well as insights concerning French regulatory practices. The staff identified approximately 25 design differences, and an analysis of the safety significance of each of these design features is presented, along with an assessment comparing the relative safety benefit of each

  5. Different regulatory strategies in regulation of nuclear power projects: An Indian experience

    International Nuclear Information System (INIS)

    Khan, Sohail Ahmad

    2002-01-01

    Regulatory strategy needed for management of safety and safety culture involves careful planning and use of engineering concepts keeping in mind feasibility to implement certain safety requirements. It also requires adequate attention on working environment and mental conditions of designers, operating and maintenance staff and regulators. Different strategies followed during safety review and regulatory inspection of nuclear power projects for improving status of safety management and safety cultures have given certain results. The present paper brings out certain experience gained during regulation of Indian Nuclear Power Projects by Atomic Energy Regulatory Board of India in the area of management of safety and safety culture. (author)

  6. Belgium; Staff Report for the 2001 Article IV Consultation

    OpenAIRE

    International Monetary Fund

    2002-01-01

    This 2001 Article IV Consultation highlights that following four years of robust expansion, real GDP growth in Belgium slowed markedly in 2001, as higher oil prices, declining equity values, and the deteriorating external environment adversely affected business investment, household consumption, and exports. The outlook for 2002 depends critically on a recovery in the world economy and, especially, in Belgium’s key European trading partners. Growth for the year is projected by the IMF staff a...

  7. Optimisation of staff protection

    International Nuclear Information System (INIS)

    Faulkner, K.; Marshall, N.W.; Rawlings, D.J.

    1997-01-01

    It is important to minimize the radiation dose received by staff, but it is particularly important in interventional radiology. Staff doses may be reduced by minimizing the fluoroscopic screening time and number of images, compatible with the clinical objective of the procedure. Staff may also move to different positions in the room in an attempt to reduce doses. Finally, staff should wear appropriate protective clothing to reduce their occupational doses. This paper will concentrate on the optimization of personal shielding in interventional radiology. The effect of changing the lead equivalence of various protective devices on effective dose to staff has been studied by modeling the exposure of staff to realistic scattered radiation. Both overcouch x-ray tube/undercouch image intensified and overcouch image intensifier/undercouch x-ray tube geometries were simulated. It was deduced from this simulation that increasing the lead apron thickness from 0.35 mm lead to 0.5 mm lead had only a small reducing effect. By contrast, wearing a lead rubber thyroid shield or face mask is a superior means of reducing the effective dose to staff. Standing back from the couch when the x-ray tube is emitting radiation is another good method of reducing doses, being better than exchanging a 0.35 mm lead apron for a 0.5 mm apron. In summary, it is always preferable to shield more organs than to increase the thickness of the lead apron. (author)

  8. An A BWR demonstration simulator for training and developing technical staff

    International Nuclear Information System (INIS)

    Powers, J.; Yonezawa, H.; Aoyagi, Y.; Kataoka, K.

    2015-09-01

    The US-Advanced Boiling Water Reactor (A BWR), certified by the US NRC, is a third generation, evolutionary boiling water reactor design which is the reference for the South Texas Project Units 3 and 4 (STP3-4) Combined License Application (Cola). Nuclear Innovation North America (Nina) is the License Applicant for this new build project, and Toshiba is the selected primary technology contractor. Toshiba has developed a Demonstration Simulator of the A BWR control room that provides a realistic experience for training and education on BWR principles and operations fundamentals. The Demonstration Simulator is located in the Toshiba America Nuclear Energy (Tane) office in Charlotte, North Carolina and is composed of standard office computer equipment set up in a specific arrangement that is representative of the layout of an A BWR control room. The Demonstration Simulator is not intended for licensed operator training, but can provide a framework for encouraging entry level technically oriented nuclear workers to enter the operations field; strengthening the linkage between university energy field curricula and real-life application of theory; and, improving understanding of integrated plant operations for developing station technical staff. This paper describes the A BWR Demonstration Simulator and its applications for training and educating future nuclear workers. (Author)

  9. An A BWR demonstration simulator for training and developing technical staff

    Energy Technology Data Exchange (ETDEWEB)

    Powers, J. [Toshiba America Nuclear Energy, Charlotte, North Carolina (United States); Yonezawa, H.; Aoyagi, Y.; Kataoka, K., E-mail: jim.powers@toshiba.com [Toshiba Corporation, Kawasaki, Kanagawa (Japan)

    2015-09-15

    The US-Advanced Boiling Water Reactor (A BWR), certified by the US NRC, is a third generation, evolutionary boiling water reactor design which is the reference for the South Texas Project Units 3 and 4 (STP3-4) Combined License Application (Cola). Nuclear Innovation North America (Nina) is the License Applicant for this new build project, and Toshiba is the selected primary technology contractor. Toshiba has developed a Demonstration Simulator of the A BWR control room that provides a realistic experience for training and education on BWR principles and operations fundamentals. The Demonstration Simulator is located in the Toshiba America Nuclear Energy (Tane) office in Charlotte, North Carolina and is composed of standard office computer equipment set up in a specific arrangement that is representative of the layout of an A BWR control room. The Demonstration Simulator is not intended for licensed operator training, but can provide a framework for encouraging entry level technically oriented nuclear workers to enter the operations field; strengthening the linkage between university energy field curricula and real-life application of theory; and, improving understanding of integrated plant operations for developing station technical staff. This paper describes the A BWR Demonstration Simulator and its applications for training and educating future nuclear workers. (Author)

  10. Mountaineer Commercial Scale Carbon Capture and Storage Project Topical Report: Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Guy Cerimele

    2011-09-30

    This Preliminary Public Design Report consolidates for public use nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project. The report is based on the preliminary design information developed during the Phase I - Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: (1) DOE's Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; (2) Alstom's Chilled Ammonia Process (CAP) carbon capture retrofit technology and the carbon storage and monitoring system; (3) AEP's retrofit approach in terms of plant operational and integration philosophy; (4) The process island equipment and balance of plant systems for the CAP technology; (5) The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; (6) Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and (7) AEP's decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.

  11. Mapping Staff Competencies for Information Literacy Interventions

    Directory of Open Access Journals (Sweden)

    Sheila Corrall

    2010-09-01

    Full Text Available Information literacy (IL is a key strategic objective for academic libraries. Many academic librarians are involved in designing, developing and delivering IL programmes, using both classroom teaching and e-learning methods. IL has also become a priority at institutional level and some universities and colleges have formal policies and strategies to integrate and embed IL in the curriculum. IL interventions also happen informally at enquiry points and reference desks, when queries offer ‘teachable moments’ for library staff to help students develop information skills and understanding while solving their information problems. Research shows that such instruction features strongly in both face-to-face and virtual reference transactions, but few IL policies and strategies cover this frontline personalised IL support. Similarly, most discussion of staff training and development for IL education has centred on the teaching roles and pedagogical knowledge of professional librarians, with limited discussion of the competencies needed for frontline interventions by paraprofessionals or assistants. This workshop promotes an inclusive holistic model of IL education and library workforce development. It will investigate the skills and knowledge needed by frontline staff to contribute effectively to the IL mission of academic libraries. It will focus on the learning support needed by students from different educational, social, ethnic and cultural backgrounds, with particular reference to postgraduate students, as a group typifying this diversity. The facilitator will review IL interventions and library staff competencies discussed in the literature. Participants will discuss typical queries or problems presented by different categories of postgraduate students and then identify the skills, knowledge and understanding required by frontline staff to provide an appropriate service response. The skillsets identified will be compared with those of teaching

  12. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    International Nuclear Information System (INIS)

    PICKETT, W.W.

    2000-01-01

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. Because this sub-project is still in the construction/start-up phase, all verification activities have not yet been performed (e.g., canister cover cap and welding fixture system verification, MCO Internal Gas Sampling equipment verification, and As-built verification.). The verification activities identified in this report that still are to be performed will be added to the start-up punchlist and tracked to closure

  13. DESIGN VERIFICATION REPORT SPENT NUCLEAR FUEL (SNF) PROJECT CANISTER STORAGE BUILDING (CSB)

    Energy Technology Data Exchange (ETDEWEB)

    BAZINET, G.D.

    2003-02-12

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Revision 3 of this document incorporates MCO Cover Cap Assembly welding verification activities. Verification activities for the installed and operational SSCs have been completed.

  14. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    Energy Technology Data Exchange (ETDEWEB)

    PICKETT, W.W.

    2000-09-22

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. Because this sub-project is still in the construction/start-up phase, all verification activities have not yet been performed (e.g., canister cover cap and welding fixture system verification, MCO Internal Gas Sampling equipment verification, and As-built verification.). The verification activities identified in this report that still are to be performed will be added to the start-up punchlist and tracked to closure.

  15. Supplmental design requirements document enhanced radioactive and mixed waste storage: Phase 5, Project W-113

    International Nuclear Information System (INIS)

    Ocampo, V.P.

    1994-11-01

    This Supplemental Design Requirements Document (SDRD) is used to communicate Project W-113 specific plant design information from Westinghouse Hanford Company (WHC) to the United States Department of Energy (DOE) and the cognizant Architect Engineer (A/E). The SDRD is prepared after the completion of the project Conceptual Design report (CDR) and prior to the initiation of definitive design. Information in the SDRD serves two purposes: to convey design requirements that are too detailed for inclusion in the Functional Design Criteria (FDC) report and to serve as a means of change control for design commitments in the Title I and Title II design. The Solid Waste Retrieval Project (W-113) SDRD has been restructured from the equipment based outline used in previous SDRDs to a functional systems outline. This was done to facilitate identification of deficiencies in the information provided in the initial draft SDRD and aid design confirmation. The format and content of this SDRD adhere as closely as practicable to the requirements of WHC-CM-6-1, Standard Engineering Practices for Functional Design Criteria

  16. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    scheduling is investigated. The airport terminal is divided into zones, where each zone consists of a set of stands geographically next to each other. Staff is assigned to work in only one zone and the staff scheduling is planned decentralized for each zone. The advantage of this approach is that the staff...... work in a smaller area of the terminal and thus spends less time walking between stands. When planning decentralized the allocation of stands to flights influences the staff scheduling since the workload in a zone depends on which flights are allocated to stands in the zone. Hence solving the problem...... depends on the actual stand allocation but also on the number of zones and the layout of these. A mathematical model of the problem is proposed, which integrates the stand allocation and the staff scheduling. A heuristic solution method is developed and applied on a real case from British Airways, London...

  17. New staff contract policy

    CERN Document Server

    HR Department

    2006-01-01

    Following discussion at TREF and on the recommendation of the Finance Committee, Council approved a new staff contract policy, which became effective on 1 January 2006. Its application is covered by a new Administrative Circular No. 2 (Rev. 3) 'Recruitment, appointment and possible developments regarding the contractual position of staff members'. The revised circular replaces the previous Circulars No. 9 (Rev. 3) 'Staff contracts' and No. 2 (Rev. 2) 'Guidelines and procedures concerning recruitment and probation period for staff members'. The main features of the new contract policy are as follows: The new policy provides chances for long-term employment for all staff recruits staying for four years without distinguishing between those assigned to long-term or short-term activities when joining CERN. In addition, it presents a number of simplifications for the award of ICs. There are henceforth only 2 types of contract: Limited Duration (LD) contracts for all recruitment and Indefinite Contracts (IC) for...

  18. Mixed methods for implementation research: application to evidence-based practice implementation and staff turnover in community-based organizations providing child welfare services.

    Science.gov (United States)

    Aarons, Gregory A; Fettes, Danielle L; Sommerfeld, David H; Palinkas, Lawrence A

    2012-02-01

    Many public sector service systems and provider organizations are in some phase of learning about or implementing evidence-based interventions. Child welfare service systems represent a context where implementation spans system, management, and organizational concerns. Research utilizing mixed methods that combine qualitative and quantitative design, data collection, and analytic approaches are particularly well suited to understanding both the process and outcomes of dissemination and implementation efforts in child welfare systems. This article describes the process of using mixed methods in implementation research and provides an applied example of an examination of factors impacting staff retention during an evidence-based intervention implementation in a statewide child welfare system. The authors integrate qualitative data with previously published quantitative analyses of job autonomy and staff turnover during this statewide implementation project in order to illustrate the utility of mixed method approaches in providing a more comprehensive understanding of opportunities and challenges in implementation research.

  19. Nurses and nurse assistants' experiences with using a design thinking approach to innovation in a nursing home.

    Science.gov (United States)

    Eines, Trude Fløystad; Vatne, Solfrid

    2018-05-01

    The aim of this study was to evaluate nurses' and nurse assistants' experiences with a design thinking approach to innovation used in a nursing home in Norway. A design thinking approach to innovation that focuses on users' needs can be employed to address many of the challenges facing health care providers in a field facing a growing ageing population, complex diseases and financial shortfalls. This study is based on a thematic analysis of four focus group interviews with nurses and nurse assistants (n = 23). In the initial phase of developing the new service model, which included defining staff roles and responsibilities, participating nurses and nurse assistants felt engaged and motivated by the designers' inclusive and creative methods. However, during the new model's testing phase, they were critical of management's lack of involvement in the model`s implementation and therefore became less motivated about the project. The findings of the study highlight the importance of the designers cooperating with management and staff for the duration of the innovation process. Challenging innovation processes require strong managers who engage with designers, patients, staff and volunteers throughout all phases of an innovation process using a design thinking approach. © 2017 John Wiley & Sons Ltd.

  20. Advanced fusion concepts project summaries: 1981

    International Nuclear Information System (INIS)

    1982-03-01

    This report contains descriptions of the activities of all the projects supported by the Advanced Fusion Concepts Branch of the Office of Fusion Energy, US Department of Energy. These descriptions are project summaries of each of the individual projects, and contain the following: title, principle investigators, funding levels, purpose, approach, progress, plans, milestones, graduate students, graduates, other professional staff, and recent publications

  1. Developing a structured education reminiscence-based programme for staff in long-stay care facilities in Ireland.

    Science.gov (United States)

    Cooney, Adeline; O'Shea, Eamon; Casey, Dympna; Murphy, Kathy; Dempsey, Laura; Smyth, Siobhan; Hunter, Andrew; Murphy, Edel; Devane, Declan; Jordan, Fionnuala

    2013-07-01

    This paper describes the steps used in developing and piloting a structured education programme - the Structured Education Reminiscence-based Programme for Staff (SERPS). The programme aimed to prepare nurses and care assistants to use reminiscence when caring for people with dementia living in long-term care. Reminiscence involves facilitating people to talk or think about their past. Structured education programmes are used widely as interventions in randomised controlled trials. However, the process of developing a structured education programme has received little attention relative to that given to evaluating the effectiveness of such programmes. This paper makes explicit the steps followed to develop the SERPS, thereby making a contribution to the methodology of designing and implementing effective structured education programmes. The approach to designing the SERPS was informed by the Van Meijel et al. (2004) model (Journal of Advanced Nursing 48, 84): (1) problem definition, (2) accumulation of building blocks for intervention design, (3) intervention design and (4) intervention validation. Grounded theory was used (1) to generate data to shape the 'building blocks' for the SERPS and (2) to explore residents, family and staff's experience of using/receiving reminiscence. Analysis of the pilot data indicated that the programme met its objective of preparing staff to use reminiscence with residents with dementia. Staff were positive both about the SERPS and the use of reminiscence with residents with dementia. This paper outlines a systematic approach to developing and validating a structured education programme. Participation in a structured education programme is more positive for staff if they are expected to actively implement what they have learnt. Ongoing support during the delivery of the programme is important for successful implementation. The incorporation of client and professional experience in the design phase is a key strength of this approach

  2. A feeling for Systems Development Work - Design of the ROSA project

    DEFF Research Database (Denmark)

    Bødker, Susanne; Greenbaum, Joan

    1988-01-01

    This article is based on the design of a research project that will look at intuition, learning processes, language and roles in the development of computer systems. The research project, called ROSA (a Danish acronym for Roles and Cooperation in Systems Development) grew out of our interest...... in the informal working practices among systems developers, because it is these informal working relationships that are most often overlooked in research about computer science methods and tools. The project applies a gender perspective to look at the informal work relations of systems developers. The concept...

  3. An Integrated Model of Patient and Staff Satisfaction Using Queuing Theory.

    Science.gov (United States)

    Komashie, Alexander; Mousavi, Ali; Clarkson, P John; Young, Terry

    2015-01-01

    This paper investigates the connection between patient satisfaction, waiting time, staff satisfaction, and service time. It uses a variety of models to enable improvement against experiential and operational health service goals. Patient satisfaction levels are estimated using a model based on waiting (waiting times). Staff satisfaction levels are estimated using a model based on the time spent with patients (service time). An integrated model of patient and staff satisfaction, the effective satisfaction level model, is then proposed (using queuing theory). This links patient satisfaction, waiting time, staff satisfaction, and service time, connecting two important concepts, namely, experience and efficiency in care delivery and leading to a more holistic approach in designing and managing health services. The proposed model will enable healthcare systems analysts to objectively and directly relate elements of service quality to capacity planning. Moreover, as an instrument used jointly by healthcare commissioners and providers, it affords the prospect of better resource allocation.

  4. Enhancing the well-being of support services staff in higher education: The power of appreciation

    Directory of Open Access Journals (Sweden)

    Laurika van Straaten

    2016-07-01

    Full Text Available Orientation: A literature search for studies on the well-being of support staff of higher education institutions (HEIs produced very little results. Appreciation was then used to identify elements that might enhance the well-being of a selected HEI’s support staff. Research purpose: The aim was to explore the strengths of a selected HEI that might serve as driving forces for enhancing its support staff’s well-being. Motivation for the study: The lack of research on the well-being of support staff motivated the study. A need was identified to explore driving forces that might enhance their well-being. Research design, approach and method: A literature review guided by theoretical perspectives and theories on staff well-being was conducted. Subsequently, a qualitative action research design involving an Appreciative Inquiry (AI workshop with support staff of an institution was followed. Main findings: The following strengths that might serve as driving forces for enhancing the well-being of the institution’s support services staff were identified: hard-working and dedicated support staff, positive relations among colleagues, a willingness to adapt to change,good remuneration and benefits, job security and a supportive work environment. Appreciative Inquiry was found to be well suited for identifying such strengths, as opposed to methods that focus on identifying problems or weaknesses of an organisation. As a result of this study, the relevant institution might react and build on these identified strengths towards promoting the well-being of its support staff. Practical/managerial implications: Institutions should make an effort to enhance staff well being. The results of the study could also be used to encourage HEIs to use AI to establish optimal staff well-being. Contribution/value add: The study confirmed the power of appreciation to identify the strengths that might serve as driving forces for enhancing the well-being of support staff

  5. Northeast Oregon Hatchery Project, Conceptual Design Report, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Watson, Montgomery (Montgomery Watson, Bellevue, WA)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  6. Northeast Oregon Hatchery Project conceptual design report. Final report

    International Nuclear Information System (INIS)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed

  7. The impact of staff training on staff outcomes in dementia care: a systematic review.

    Science.gov (United States)

    Spector, Aimee; Revolta, Catherine; Orrell, Martin

    2016-11-01

    Caring for people with dementia can be emotionally challenging and is often linked to low job satisfaction and burnout in care staff. Staff training within care settings is potentially valuable in improving well-being and quality of care. This review aimed to (i) establish the impact of training on staff outcomes; (ii) compare the impact of different training approaches; (iii) explore the influence of training intensity; and (iv) explore potential barriers to success. A database search of staff training interventions revealed 207 papers, 188 of which were excluded based on prespecified criteria. Nineteen studies were included and appraised using a quality rating tool. Overall, the studies were found to be of variable quality; however, 16 studies found a significant change following training in at least one staff domain, with knowledge improving most frequently. Approaches focusing on managing challenging behaviours appeared to be the most effective. Training staff can be an effective method of improving well-being, and programmes helping staff to manage challenging behaviour appear to be the most beneficial. There is no clear relationship between training intensity and outcome. Most studies point to the importance of addressing organisational factors as a barrier to change. Copyright © 2016 John Wiley & Sons, Ltd. Copyright © 2016 John Wiley & Sons, Ltd.

  8. Large hadron collider (LHC) project quality assurance plan

    Energy Technology Data Exchange (ETDEWEB)

    Gullo, Lisa; Karpenko, Victor; Robinson, Kem; Turner, William; Wong, Otis

    2002-09-30

    The LHC Quality Assurance Plan is a set of operating principles, requirements, and practices used to support Berkeley Lab's participation in the Large Hadron Collider Project. The LHC/QAP is intended to achieve reliable, safe, and quality performance in the LHC project activities. The LHC/QAP is also designed to fulfill the following objectives: (1) The LHC/QAP is Berkeley Lab's QA program document that describes the elements necessary to integrate quality assurance, safety management, and conduct of operations into the Berkeley Lab's portion of the LHC operations. (2) The LHC/QAP provides the framework for Berkeley Lab LHC Project administrators, managers, supervisors, and staff to plan, manage, perform, and assess their Laboratory work. (3) The LHC/QAP is the compliance document that conforms to the requirements of the Laboratory's Work Smart Standards for quality assurance (DOE O 414.1, 10 CFR 830.120), facility operations (DOE O 5480.19), and safety management (DOE P 450.4).

  9. Large hadron collider (LHC) project quality assurance plan

    International Nuclear Information System (INIS)

    Gullo, Lisa; Karpenko, Victor; Robinson, Kem; Turner, William; Wong, Otis

    2002-01-01

    The LHC Quality Assurance Plan is a set of operating principles, requirements, and practices used to support Berkeley Lab's participation in the Large Hadron Collider Project. The LHC/QAP is intended to achieve reliable, safe, and quality performance in the LHC project activities. The LHC/QAP is also designed to fulfill the following objectives: (1) The LHC/QAP is Berkeley Lab's QA program document that describes the elements necessary to integrate quality assurance, safety management, and conduct of operations into the Berkeley Lab's portion of the LHC operations. (2) The LHC/QAP provides the framework for Berkeley Lab LHC Project administrators, managers, supervisors, and staff to plan, manage, perform, and assess their Laboratory work. (3) The LHC/QAP is the compliance document that conforms to the requirements of the Laboratory's Work Smart Standards for quality assurance (DOE O 414.1, 10 CFR 830.120), facility operations (DOE O 5480.19), and safety management (DOE P 450.4)

  10. A Project-Based Learning Approach to Programmable Logic Design and Computer Architecture

    Science.gov (United States)

    Kellett, C. M.

    2012-01-01

    This paper describes a course in programmable logic design and computer architecture as it is taught at the University of Newcastle, Australia. The course is designed around a major design project and has two supplemental assessment tasks that are also described. The context of the Computer Engineering degree program within which the course is…

  11. The SOLS TICE Project: Satellite Television and Audioconferencing in Continuing Professional Development for LIS Staff.

    Science.gov (United States)

    Hughes, Alun; Priestley, John

    1992-01-01

    Describes SOLS TICE, the Satellite On-Line Searching Interactive Conferencing Experiment, conducted at the University of Plymouth (United Kingdom) to meet the training needs of staff in the library and information science (LIS) sector. Continuing professional development is discussed, instructional effectiveness and cost effectiveness are…

  12. Improving Nursing Home Staff Knowledge and Attitudes about Pain

    Science.gov (United States)

    Jones, Katherine R.; Fink, Regina; Pepper, Ginny; Hutt, Eveyln; Vojir, Carol P.; Scott, Jill; Clark, Lauren; Mellis, Karen

    2004-01-01

    Purpose: Effective pain management remains a serious problem in the nursing home setting. Barriers to achieving optimal pain practices include staff knowledge deficits, biases, and attitudes that influence assessment and management of the residents' pain. Design and Methods: Twelve nursing homes participated in this intervention study: six…

  13. Design interface management system for nuclear power plant project

    International Nuclear Information System (INIS)

    Wang Jun

    2012-01-01

    Design interfaces exist between different participants and during the whole course of a nuclear power project, and include different disciplinary requirements. The purpose of interface management is to establish a procedure, which can be efficiently used to control the complex design interfaces and ensure its compliance with NPP design requirements. To this end, a complete work procedures and relationship will be defined and classified, so as to set up the structure of interface management system. The system consists of three levels, i.e. working procedure level, management tool level and technical document level. Two management routes, i.e. administration route and technical route, are adopted so as to conduct management efficiently. (author)

  14. Clinical aspects of the Mayo/IBM PACS project

    Science.gov (United States)

    Forbes, Glenn S.; Morin, Richard L.; Pavlicek, William

    1991-07-01

    A joint project between Mayo Clinic and IBM to develop a picture archival and communications system has been under development for three years. This project began as a potential solution to a pressing archival problem in magnetic resonance imaging. The project has grown to encompass a much larger sphere of activity including workstations, image retrieval, and report archival. This report focuses on the clinical aspects involved in the design, development, and implementation of such a system. In particular, emphasis is placed on the clinical impact of the system both inside and outside of the radiology department. The primary concerns have centered on fidelity of archival data, ease of use, and diagnostic efficacy. The project to date has been limited to neuroradiology practice. This group consists of nine staff radiologists and fellows. Administrative policy decisions regarding the accessibility and available of digital data in the clinical environment have been much more difficult and complex than originally conceived. Based on the observations thus far, the authors believe the system will become a useful and valuable adjunct to clinical practice of radiology.

  15. Design and delivery of the diamond double double bend achromat project

    International Nuclear Information System (INIS)

    Kay, J.; Hammond, N. P.; Thomson, A.

    2016-01-01

    A major project is underway at Diamond Light Source to remove one of the 24 Double Bend Achromat (DBA) Storage Ring cells and replace it with a Double Double Bend Achromat (DDBA). In this way a new Insertion Device (ID) straight can be created and so ID light can be produced and delivered to a beamline previously only capable of receiving Bending Magnet (BM) radiation. This project is in support of the micro-focus Protein Crystallography (MX) beamline VMX-m which is scheduled to take users towards the end of 2017. This paper describes the Engineering Design of the DDBA project in more detail and gives the current status of the project.

  16. Design and delivery of the diamond double double bend achromat project

    Energy Technology Data Exchange (ETDEWEB)

    Kay, J., E-mail: jim.kay@diamond.ac.uk; Hammond, N. P.; Thomson, A. [Diamond Light Source, Didcot, Oxfordshire, UK, OX11 0DE (United Kingdom)

    2016-07-27

    A major project is underway at Diamond Light Source to remove one of the 24 Double Bend Achromat (DBA) Storage Ring cells and replace it with a Double Double Bend Achromat (DDBA). In this way a new Insertion Device (ID) straight can be created and so ID light can be produced and delivered to a beamline previously only capable of receiving Bending Magnet (BM) radiation. This project is in support of the micro-focus Protein Crystallography (MX) beamline VMX-m which is scheduled to take users towards the end of 2017. This paper describes the Engineering Design of the DDBA project in more detail and gives the current status of the project.

  17. Implications of staff 'churn' for nurse managers, staff, and patients.

    Science.gov (United States)

    Duffield, Christine; Roche, Michael; O'Brien-Pallas, Linda; Catling-Paull, Christine

    2009-01-01

    In this article, the term "churn" is used not only because of the degree of change to staffing, but also because some of the reasons for staff movement are not classified as voluntary turnover. The difficulties for the nurse managing a unit with the degree of "churn" should not be under-estimated. Changes to skill mix and the proportions of full-time, agency, and temporary staff present challenges in providing clinical leadership, scheduling staff, performance management, and supervision. Perhaps more importantly, it is likely that there is an impact on the continuity of care provided in the absence of continuity of staffing. A greater understanding of the human and financial costs and consequences, and a willingness to change established practices at the institutional and ward level, are needed.

  18. Mechanistic-Empirical (M-E) Design Implementation & Monitoring for Flexible Pavements : 2018 PROJECT SUMMARY

    Science.gov (United States)

    2018-06-01

    This document is a summary of the tasks performed for Project ICT-R27-149-1. Mechanistic-empirical (M-E)based flexible pavement design concepts and procedures were previously developed in Illinois Cooperative Highway Research Program projects IHR-...

  19. Cam Design Projects in an Advanced CAD Course for Mechanical Engineers

    Science.gov (United States)

    Ault, H. K.

    2009-01-01

    The objective of this paper is to present applications of solid modeling aimed at modeling of complex geometries such as splines and blended surfaces in advanced CAD courses. These projects, in CAD-based Mechanical Engineering courses, are focused on the use of the CAD system to solve design problems for applications in machine design, namely the…

  20. A First Implementation of a Design Thinking Workshop During a Mobile App Development Project Course

    OpenAIRE

    Pham, Yen Dieu; Fucci, Davide; Maalej, Walid

    2018-01-01

    Due to their characteristics, millennials prefer learning-by-doing and social learning, such as project-based learning. However, software development projects require not only technical skills but also creativity; Design Thinking can serve such purpose. We conducted a workshop following the Design Thinking approach of the d.school, to help students generating ideas for a mobile app development project course. On top of the details for implementing the workshop, we report our observations, les...