WorldWideScience

Sample records for project staff designed

  1. Effective utilization of maintenance staff in design and implementation of major project work

    International Nuclear Information System (INIS)

    Wyman, D.; Dingle, J.; Brown, R.

    1995-01-01

    The reorganization of Pickering Nuclear Division some 2 years ago resulted in the formation of the Projects and Modifications department. This department takes an integrated approach to manage all aspects of large projects at Pickering. The integration of Design, Drafting, Procurement, Construction and Operations functions into project teams represents a fundamental change to project management at Pickering. The development of integrated teams has great potential for reducing both the time and cost associated with project implementation, while at the same time improving the quality, and maintainability of the commissioned in service project. The Pickering Rehab organization 1989-1993, established to perform the rehab / retube of Units 3 and 4 had proven that a team environment will produce effective results. The outcome was astounding, critical categories such as Safety, Quality of Work, and Timeliness, had proven the team's effectiveness. The integration of operations maintenance staff into the project work activities is still evolving, and has probably required the most adaptation to change for both the former Construction and Operations organizations. Maximizing the utilization of the maintenance staff in the design and implementation of major project work will prove to be a key to a long term operating success of these projects. This paper will focus in on the effective usage of Maintenance staff in the design and implementation phases of major project work at Pickering, and on the benefits realized using this approach. It will be divided into 5 sections as indicated. 1. Past Project Shortfalls. 2. Benefits of the inclusion of Maintenance staff in the Calandria Vault Rehab Project. 3. Maintenance involvement in the Pickering 'A' Shutdown System Enhancement (SDSE) Project. 4. Challenges resulting from the inclusion of Maintenance staff project teams. 5. Summary. (author)

  2. Staff training program of CANDU projects in Saskatoon

    International Nuclear Information System (INIS)

    Huterer, J.

    1996-01-01

    This paper describes the training process for a nuclear project on a new site. When AECL opened a project office Saskatoon, senior management recognized the need for large scale staff training and made the necessary commitments. Two types of training programs were initiated, general and technical. The general training plan included topics related to nuclear project life cycle. Technical training was discipline and task specific. Based on the job descriptions and staff qualifications, technical training requirements were documented for the entire staff. The training strategy was developed and implemented. Detailed records were maintained to monitor the progress, draw conclusions, and plan training for future nuclear facilities. (author)

  3. Forty project management strategies for the medical practice staff.

    Science.gov (United States)

    Hills, Laura Sachs

    2010-01-01

    Most every medical practice will embark at one time or another on a large and complex new project. The practice may, for instance, undertake a project in office construction or renovation, practice expansion, new technology, or a new large-scale event. The medical practice staff may find itself creating the project plan, overseeing its execution, and working through the plan day to day until its completion. In short, the staff may find itself responsible for project management. This article contains 40 specific, easy-to-implement project management strategies medical practice employees can use to manage both the large and small projects they undertake on behalf of the practice. It suggests effective project management strategies the staff can use before the onset of a new project as well as strategies to help define the project, to deliver the project, and to close and review the project. This article also describes five reasons medical practices often fail at project management and suggests more effective approaches that will ensure that the projects the medical practice undertakes are completed well, on time, and within budget.

  4. Optimization education after project implementation: sharing "lessons learned" with staff.

    Science.gov (United States)

    Vaughn, Susan

    2011-01-01

    Implementations involving healthcare technology solutions focus on providing end-user education prior to the application going "live" in the organization. Benefits to postimplementation education for staff should be included when planning these projects. This author describes the traditional training provided during the implementation of a bar-coding medication project and then the optimization training 8 weeks later.

  5. Project on School Staff Health Promotion in Poland: The First Experiences

    Science.gov (United States)

    Woynarowska-Soldan, Magdalena

    2015-01-01

    Purpose: The purpose of this paper is to present the concept, methods of implementation, results and experiences from the first stage of the three-year project on school staff health promotion carried out within the framework of the health-promoting school (HPS) network in Poland. Design/methodology/approach: The project was implemented in 2012 in…

  6. [Outcomes evaluation of the school staff health promotion project].

    Science.gov (United States)

    Woynarowska-Sołdan, Magdalena

    This article presents selected outcomes of a 3-year project "Health promotion of school staff in health-promoting schools," as well as the achievements and difficulties in its implementation. The research was conducted on 644 teachers and 226 members of non-teaching staff in 21 schools. The method involved opinion poll and authored questionnaires. A 2-part model of outcome evaluation was developed. Most participants appreciated the changes that took place within the 3 years of the project implementation. These included the improved level of their knowledge about health, health-conducive behaviors (62-93%) and the physical and social environment of the school (50-92%). Changes were more frequently acknowledged by teachers. About 80% of the participants had a positive attitude to the project, but only 20% assessed their involvement as considerable. About 90% believed that health promotion activities should be continued. According to the project leaders, insufficient support and financial resources, and difficulties in motivating school employees, particularly the nonteaching staff, to undertake health-promotion activities were the major handicaps in the project implementation. The project outcomes can be assessed as satisfying. They revealed that it is posssible to initiate health promotion among school staff. This can be effective on condition that participants are motivated, actively engaged in the project and supported by the head teacher and the local community. Necessarily, school leaders should be prepared to promote health among adults and to gain support from school policy decision makers, school administration, trade unions and universities involved in teacher training. Med Pr 2016;67(2):187-200. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  7. Outcomes evaluation of the school staff health promotion project

    Directory of Open Access Journals (Sweden)

    Magdalena Woynarowska-Sołdan

    2016-04-01

    Full Text Available Background: This article presents selected outcomes of a 3-year project “Health promotion of school staff in health-promoting schools,” as well as the achievements and difficulties in its implementation. Material and Methods: The research was conducted on 644 teachers and 226 members of non-teaching staff in 21 schools. The method involved opinion poll and authored questionnaires. A 2-part model of outcome evaluation was developed. Results: Most participants appreciated the changes that took place within the 3 years of the project implementation. These included the improved level of their knowledge about health, health-conducive behaviors (62–93% and the physical and social environment of the school (50–92%. Changes were more frequently acknowledged by teachers. About 80% of the participants had a positive attitude to the project, but only 20% assessed their involvement as considerable. About 90% believed that health promotion activities should be continued. According to the project leaders, insufficient support and financial resources, and difficulties in motivating school employees, particularly the nonteaching staff, to undertake health-promotion activities were the major handicaps in the project implementation. Conclusions: The project outcomes can be assessed as satisfying. They revealed that it is posssible to initiate health promotion among school staff. This can be effective on condition that participants are motivated, actively engaged in the project and supported by the head teacher and the local community. Necessarily, school leaders should be prepared to promote health among adults and to gain support from school policy decision makers, school administration, trade unions and universities involved in teacher training. Med Pr 2016;67(2:187–200

  8. Designing Project Management

    NARCIS (Netherlands)

    Heintz, John Linke; Lousberg, L.; Wamelink, J.W.F.; Saari, A.; Huovinen, P.

    2016-01-01

    In this paper we introduce the concept of Designing Project Management. On the basis of our earlier work, we suggest that there is still a gap between what is known from recent project management literature and what project managers can structurally help in the effectiveness of their work. Assuming

  9. The Camp Hill Project: Objectives and Design

    Science.gov (United States)

    Mattingly, John B.

    1976-01-01

    Available from: EC 090 474. Outlined are the problems and objectives of Pennsylvania's Camp Hill Project--a program designed to complete psychological needs assessments for juveniles incarcerated at Camp Hill, to develop project policies and guidelines in preparation for meeting with juvenile court judges, and to hire staff. (SBH)

  10. The design explorer project

    DEFF Research Database (Denmark)

    Pejtersen, Annelise Mark; Sonnenwald, Diane H.; Buur, Jacob

    1997-01-01

    the 'Design Explorer' research project whose goal is to specify requirements for an information system that will effectively help design team members from different domains and organizational cultures to locate and utilize diverse information sources and interact more effectively throughout the design process....... The project introduces a new approach to support of design; instead of design guidelines, support is given by creating a transparent information environment in which designers can navigate freely according to their individual preferences. The project is based on a framework that structures the dimensions......, or categories, of domain information which need to be available for a system or product designer/design team in order to determine the characteristics of the artefact, or object of design. These dimensions include information about the different work domains in which the product plays a role during its lifetime...

  11. JS3P: junior staff programme pilot project

    International Nuclear Information System (INIS)

    Pretrel, H.; Tregoures, N.; Bessiron, V.; Dehoyos, A.; Delvallee, I.; Brisson, N.; Debayle, C.; Dubreuil, M.; Nicaise, G.; Perignon, J.P.; Richard, J.; Reinke, N.; Kaulard, J.; Burgener, M.; Keesmann, S.; Schramm, B.; Seubert, A.; Sternkopf, J.; Thuma, G.; Weber, S.; Smidts, O.; Maillet, E.; Bucalossi, A.; Van haesendonck, M.; Uyttenhove, W.; Mertens, J.

    2006-01-01

    Concept: The objective of the project is to allow junior staff members from the European Technical Safety Organisations (TSOs), IRSN, GRS and AVN, to work together with the final goal of creating a junior staff network, based on technical, cultural and personal interests. These projects are to show junior staff members at a very early stage during their career the need for European collaborations. They are also a tool to explore new subjects of co-operation. It is an initiative that should strengthen the links between the organisations and contribute to establishing the future of nuclear safety in Europe. A JS3P (Junior Staff Programme Pilot Project) is a project done jointly by 'junior' staff members from the three TSOs, where experience of 'seniors' is also integrated when needed. Compared to other collaborative activities, it has certain specific features. The JS3P favours staff exchanges, and technical meetings of several days should be planned during a project in order to encourage people to work together. Technical objectives are shared and the work is done jointly (reports, articles). The team involved in the JS3P should be as small as possible to favour its efficiency. The JS3P is short and easy to realize. Its duration is fixed to a maximum of about 12 months with the option to be prolonged. Typical topics are bibliographic work, comparison issues, scientific surveys, benchmark exercises and prospective investigations on innovative ideas. They can be linked to existing joint projects and then form a smaller module integrated into the large project. Topics may concern prospective issues, tentatively investigating new topics that can be seen as exploratory co-operation projects. Subjects may also concern research issues that are not a priority but that deserve to be investigated as new attractive topics. The JS3P is defined and managed by junior staff members. It is approved by a management board committee and supervised by a technical steering committee

  12. Operational Design for Peace Enforcement: Lessons for the Operational Staff

    National Research Council Canada - National Science Library

    Neumann, Michael

    2004-01-01

    U.S. involvement in Somalia serves as a useful case study of the unique challenges an operational staff may face when applying operational design to the planning and execution of a peace enforcement operation. U.S...

  13. Integrated project scheduling and staff assignment with controllable processing times.

    Science.gov (United States)

    Fernandez-Viagas, Victor; Framinan, Jose M

    2014-01-01

    This paper addresses a decision problem related to simultaneously scheduling the tasks in a project and assigning the staff to these tasks, taking into account that a task can be performed only by employees with certain skills, and that the length of each task depends on the number of employees assigned. This type of problems usually appears in service companies, where both tasks scheduling and staff assignment are closely related. An integer programming model for the problem is proposed, together with some extensions to cope with different situations. Additionally, the advantages of the controllable processing times approach are compared with the fixed processing times. Due to the complexity of the integrated model, a simple GRASP algorithm is implemented in order to obtain good, approximate solutions in short computation times.

  14. Integrated Project Scheduling and Staff Assignment with Controllable Processing Times

    Directory of Open Access Journals (Sweden)

    Victor Fernandez-Viagas

    2014-01-01

    Full Text Available This paper addresses a decision problem related to simultaneously scheduling the tasks in a project and assigning the staff to these tasks, taking into account that a task can be performed only by employees with certain skills, and that the length of each task depends on the number of employees assigned. This type of problems usually appears in service companies, where both tasks scheduling and staff assignment are closely related. An integer programming model for the problem is proposed, together with some extensions to cope with different situations. Additionally, the advantages of the controllable processing times approach are compared with the fixed processing times. Due to the complexity of the integrated model, a simple GRASP algorithm is implemented in order to obtain good, approximate solutions in short computation times.

  15. Design Theory Projectability

    DEFF Research Database (Denmark)

    Baskerville, Richard; Pries-Heje, Jan

    2014-01-01

    design science research is materially prescriptive, it requires a different perspective in developing the breadth of applications of design theories. In this paper we propose different concepts that embody forms of general technological knowledge The concept of projectability, developed originally......Technological knowledge has been characterized as having a scope that is specific to a particular problem. However, the information systems community is exploring forms of design science research that provide a promising avenue to technological knowledge with broader scope: design theories. Because...... as a means of distinguishing realized generalizations from unrealized generalizations, helps explain how design theories, being prescriptive, possess a different form of applicability. The concept of entrenchment describes the use of a theory in many projections. Together these concepts provide a means...

  16. The JET Project (Design proposal)

    International Nuclear Information System (INIS)

    1976-01-01

    This proposal describes a large Tokamak experiment, which aims to study plasma behavior in conditions and dimensions approaching those required in a fusion reactor. The maximum plasma minor radius (a) is 1.25 m and the major radius R 0 is 2.96 m. An important feature is the flexibility to study, for plasma currents in the 1→3 MA range, a wide range of aspect ratios R 0 /a=2.37→5), toroidal magnetic fields (up to 3.6T), minor radii (0.6→1.25 m) and elongation ratios (b/a=1→3.5). The cost of the apparatus, power supplies, plasma heating equipment and specific diagnostics is estimated as 70.1 Muc (March 1975 prices, 1 uc=50 FB). The total construction phase cost including commissioning, buildings and staff is 135 Muc. These figures include an average overall contingency of 30%. The construction time for the project is estimated at 5 years and requires 370 professional man years of effort in the construction organisation with additional effort deployed by the Associated Laboratories in such areas as diagnostics and plasma heating. This design proposal is arranged as follows: The preface gives an introduction to the field of fusion research and relates JET to the European and international programmes. Chapter I is a concise summary of the design proposal, it describes the objectives of research with JET, and gives a brief description of: the apparatus; the cost and construction schedules; the proposed experimental programme and the possible modes of operation of the device. A detailed account of the project is given in the rest of the report of which Chapters IV and VII comprise the engineering design and the staff and cost estimates respectively

  17. The JET project (design proposal)

    International Nuclear Information System (INIS)

    1976-03-01

    This proposal describes a large Tokamak experiment, which aims to study plasma behavior in conditions and dimensions approaching those required in a fusion reactor. The maximum plasma minor radius (a) is 1.25m and the major radius (R 0 ) is 2.96m. An important feature is the flexibility to study, for plasma currents in the 1→3MA range, a wide range of aspect ratios (R 0 /a=2.37→5), toroidal magnetic fields (up to 3.6T), minor radii (0.6→1.25m) and elongation ratios (b/a=1→3.5). The cost of the apparatus, power supplies, plasma heating equipment and specific diagnostics is estimated as 70.1Muc (march 1975 prices, 1uc=50FB). The total construction phase cost including commissioning, buildings and staff is 135Muc. These figures include an average overall contingency of 30%. The construction time for the project is estimated at 5 years and requires 370 professional man years of effort in the construction organisation with additional effort deployed by the Associated Laboratories in such areas as diagnostics and plasma heating. This design proposal is arranged as follows: an introduction to the field of fusion research is given and relates JET to the European and international programmes; a concise summary of the design proposal describes the objectives of research with JET, and gives a brief description of the apparatus, the cost and construction schedules, the proposed experimental programme and the possible modes of operation of the device. A detailed account of the engineering design and the staff and cost estimates is presented

  18. System design projects for undergraduate design education

    Science.gov (United States)

    Batill, S. M.; Pinkelman, J.

    1993-01-01

    Design education has received considerable in the recent past. This paper is intended to address one aspect of undergraduate design education and that is the selection and development of the design project for a capstone design course. Specific goals for a capstone design course are presented and their influence on the project selection are discussed. The evolution of a series of projects based upon the design of remotely piloted aircraft is presented along with students' perspective on the capstone experience.

  19. A crèche for CERN staff The Staff Association project

    CERN Multimedia

    Association du personnel

    2006-01-01

    For many years, the Staff Association has supported the demand for the creation of a crèche for the children of CERN staff. Several studies have been carried out without leading to a concrete plan. The fact that the CERN population is getting younger and the shortage of local facilities have led to a more urgent demand for this type of social service over the past few years. Furthermore, the Equal Opportunities Panel had already recommended that crèche places be made available.

  20. Reengineering the Project Design Process

    Science.gov (United States)

    Casani, E.; Metzger, R.

    1994-01-01

    In response to NASA's goal of working faster, better and cheaper, JPL has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center and the Flight System Testbed. Reengineering at JPL implies a cultural change whereby the character of its design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and cost estimating.

  1. Staff Helping Attain Relevant Education (Project SHARE): Final Evaluation Report, 1992-93. OREA Report.

    Science.gov (United States)

    Ranadive, Jyoti

    Project SHARE (Staff Helping Attain Relevant Education), a project funded by Title VII of the Elementary and Secondary Education Act, was in its third and final year of operation in 1992-93, in eight primary schools in the Bronx, Brooklyn, and Manhattan (New York). The project served 141 limited English proficient students from low-income families…

  2. Integration of Staff Development and Research: Description of the Staff Development Project in Progress for the School Year 1975-1976. Technical Report #62.

    Science.gov (United States)

    Speidel, Gisela E.

    This report from the Kamehameha Early Education Program (KEEP) describes the 1975-76 KEEP staff development program, which was designed to integrate staff development and research. Specific purposes of the program were: (1) to develop the abilities of the teaching staff in teaching, consultation, and research; (2) to conduct pilot research in…

  3. The Impact of an Implementation Project on Primary Care Staff Perceptions of Delivering Brief Alcohol Advice

    Directory of Open Access Journals (Sweden)

    Hanna Reinholdz

    2016-01-01

    Full Text Available Objective. To explore how the perceptions and experiences of working with risky drinkers change over time among primary health care staff during a systematic implementation project. Methods. Qualitative focus group interviews took place before and after the implementation of the project. Results. The staff displayed a positive change during the implementation period with regard to awareness, knowledge, and confidence that led to a change in routine practice. Throughout the project, staff were committed to engaging with risky drinkers and appeared to have been learning-by-doing. Conclusions. The results indicated a positive attitude to alcohol prevention work but staff lack knowledge and confidence in the area. The more practical experience during the study is, the more confidence seems to have been gained. This adds new knowledge to the science of implementation studies concerning alcohol prevention measures, which have otherwise shown disappointing results, emphasizing the importance of learning in practice.

  4. Reengineering the project design process

    Science.gov (United States)

    Kane Casani, E.; Metzger, Robert M.

    1995-01-01

    In response to the National Aeronautics and Space Administration's goal of working faster, better, and cheaper, the Jet Propulsion Laboratory (JPL) has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Development Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center (PDC) and the Flight System Testbed (FST). Reengineering at JPL implies a cultural change whereby the character of the Laboratory's design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and more accurate cost estimating. These improvements signal JPL's commitment to meeting the challenges of space exploration in the next century.

  5. Student and Staff Perceptions of Key Aspects of Computer Science Engineering Capstone Projects

    Science.gov (United States)

    Olarte, Juan José; Dominguez, César; Jaime, Arturo; Garcia-Izquierdo, Francisco José

    2016-01-01

    In carrying out their capstone projects, students use knowledge and skills acquired throughout their degree program to create a product or provide a technical service. An assigned advisor guides the students and supervises the work, and a committee assesses the projects. This study compares student and staff perceptions of key aspects of…

  6. 20% Research & Design Science Project

    Science.gov (United States)

    Spear, Beth A.

    2015-04-01

    A project allowing employees to use 15 % of their time on independent projects was established at 3M in the 1950's. The result of this project included products like post it notes and masking tape. Google allows its employees to use 20% of their time on independently pursued projects. The company values creativity and innovation. Employees are allowed to explore projects of interest to them one day out of the week, 20 % of their work week. Products like AdSense, Gmail, Google Transit, Google News, and Google Talk are the result of this 20 % program. My school is implementing the Next Generation Science Standards (NGSS) as part of our regularly scheduled curriculum review. These new standards focus on the process of learning by doing and designing. The NGSS are very hands on and active. The new standards emphasize learning how to define, understand and solve problems in science and technology. In today's society everyone needs to be familiar with science and technology. This project allows students to develop and practice skills to help them be more comfortable and confident with science and technology while exploring something of interest to them. This project includes three major parts: research, design, and presentation. Students will spend approximately 2-4 weeks defining a project proposal and educating themselves by researching a science and technology topic that is of interest to them. In the next phase, 2-4 weeks, students design a product or plan to collect data for something related to their topic. The time spent on research and design will be dependant on the topic students select. Projects should be ambitious enough to encompass about six weeks. Lastly a presentation or demonstration incorporating the research and design of the project is created, peer reviewed and presented to the class. There are some problems anticipated or already experienced with this project. It is difficult for all students to choose a unique topic when you have large class sizes

  7. Cancer Ward Staff Group: An Intervention Designed to Prevent Disaster.

    Science.gov (United States)

    Barber, William H.

    1985-01-01

    Describes a case study illustrating organizational and system contingencies for introducing and maintaining a support group for oncology nursing staff in a large general hospital culture. Criteria for long-run survivability of innovation in a work system are applied to a group structured like that described by Balint for training physicians in…

  8. Staff technical position on regulatory considerations in the design and construction of the exploratory shaft facility

    International Nuclear Information System (INIS)

    Gupta, D.; Peshel, J.; Bunting, J.

    1991-07-01

    The staff of the US Nuclear Regulatory Commission has prepared this staff technical position for the purpose of compiling and further clarifying previous staff positions on regulatory considerations in the design and construction of the exploratory shaft facility (ESF). (The US Department of Energy (DOE) now refers to the ESF as the ''exploratory studies facility.'' DOE's change in terminology does not affect the positions taken in this guidance.) This document lists the key regulations in 10 CFR Part 60 that should be considered in the design and construction of the ESF and presents the staff position statements and corresponding discussions. 13 refs., 1 fig

  9. 18 CFR 157.37 - Project design.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Project design. 157.37... Seasons for Alaska Natural Gas Transportation Projects § 157.37 Project design. In reviewing any... proposed project has been designed to accommodate the needs of shippers who have made conforming bids...

  10. Designing Assessments of Microworld Training for Combat Service Support Staff

    National Research Council Canada - National Science Library

    Straus, Susan

    2003-01-01

    ...) microworld training. RAND developed and piloted microworld training for distribution management skills as a part of a larger project that entailed making changes to the current structure, content, and methods of CSS training...

  11. Staff Technical Position on geological repository operations area underground facility design: Thermal loads

    International Nuclear Information System (INIS)

    Nataraja, M.S.

    1992-12-01

    The purpose of this Staff Technical Position (STP) is to provide the US Department of Energy (DOE) with a methodology acceptable to the Nuclear Regulatory Commission staff for demonstrating compliance with 10 CFR 60.133(i). The NRC staff's position is that DOE should develop and use a defensible methodology to demonstrate the acceptability of a geologic repository operations area (GROA) underground facility design. The staff anticipates that this methodology will include evaluation and development of appropriately coupled models, to account for the thermal, mechanical, hydrological, and chemical processes that are induced by repository-generated thermal loads. With respect to 10 CFR 60.133(i), the GROA underground facility design: (1) should satisfy design goals/criteria initially selected, by considering the performance objectives; and (2) must satisfy the performance objectives 10 CFR 60.111, 60.112, and 60.113. The methodology in this STP suggests an iterative approach suitable for the underground facility design

  12. Operational Work System Design and Staff Performance in the Nigerian Construction Industry

    Directory of Open Access Journals (Sweden)

    Emmanuel Ejikeme Isichei

    2017-03-01

    Full Text Available Objective: The study investigated the impact of operational work system design on staff performance in selected construction firms in Nigeria. Research Design & Methods: The study used primary data gathered with the use of a 5-point Likert scale questionnaire format administered to 138 respondents. A hypothesis was postulated to test the significance of the research problem. Data analysis was carried out using correlation and multiple regression analysis which proved the significance of the alternative hypothesis as a result of testing the hypothesis. Findings: The findings show that there is a significant relationship between operational work system design and staff performance. The study concludes that operational job design can be advanced as a motivation tool, which is non-monetary in nature, to improve staff performance. Implications & Recommendations: A key drive to improve performance is the satisfaction of staff coupled with an outstanding operational job design which takes into consideration the total physical and mental well-being of staff and its interaction with other organisational factors. The study recommends, among others, that there should be active participation of staff in the design of work in the organisation. Contribution & Value Added: The study provides an empirical approach to enhancing performance in the construction industry and thereby developing an indigenous firm to compete favourably on a growing market.

  13. Project X: Accelerator Reference Design

    Energy Technology Data Exchange (ETDEWEB)

    Holmes, Stephen D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)

    2013-06-20

    Project X is a high-intensity proton facility being developed to support a world-leading program of Intensity Frontier physics over the next two decades at Fermilab. Project X is an integral part of the U.S. Intensity Frontier Roadmap as described in the P5 report of May 2008 [1] and within the Fermilab Strategic Plan of November 2011 [2]. This document represents Part I of the “Project X Book” describing the Project X accelerator facility and the broad range of physics research opportunities enabled by Project X. Parts II and III provide in-depth descriptions of the physics research program, both within and beyond particle physics [3]. The primary elements of the U.S. program to be supported by Project X include: Neutrino Experiments: Experimental studies of neutrino oscillations and neutrino interaction physics with ultra-intense neutrino beams provided by a high-power proton source with energies up to 120 GeV, utilizing near detectors at the Fermilab site and massive detectors at distant underground laboratories. Goal: At least 2 MW of proton beam power at any energy between 60 to 120 GeV; several hundred kW of proton beam power on target at 8 GeV. Kaon, Muon, Nucleon, and Neutron Precision Experiments: World-leading experiments studying ultra-rare kaon decays, searching for muon-to-electron conversion and nuclear electron dipole moments (EDMs), and exploring neutron properties at very high precision. Goal: MW-class proton beams supporting multiple experiments at 1 and 3 GeV, with flexible capability for providing distinct beam formats to concurrent users while allowing simultaneous operations with the neutrino program. Material Science and Nuclear Energy Applications: High-intensity accelerator, spallation, target and transmutation technology demonstrations will provide critical input into the design of future energy systems, including next generation fission reactors, nuclear waste transmutation systems and future thorium fuel-cycle power systems. Possible

  14. Benefits of co-design in service design projects

    NARCIS (Netherlands)

    Steen, M.; Manschot, M.A.J.; De Koning, N.

    2011-01-01

    In many service design projects, co-design is seen as critical to success and a range of benefits are attributed to co-design. In this paper, we present an overview of benefits of co-design in service design projects, in order to help the people involved to articulate more precisely and

  15. Benefits of Co-design in Service Design Projects

    NARCIS (Netherlands)

    Steen, M.G.D.; Manschot, M.; Koning, N. de

    2011-01-01

    In many service design projects, co-design is seen as critical to success and a range of benefits are attributed to co-design. In this paper, we present an overview of benefits of co-design in service design projects, in order to help the people involved to articulate more precisely and

  16. Institutional Ethnography as Materialist Framework for Writing Program Research and the Faculty-Staff Work Standpoints Project

    Science.gov (United States)

    LaFrance, Michelle; Nicolas, Melissa

    2012-01-01

    Institutional ethnography seeks to uncover how things happen--how institutional discourse compels and shapes practice(s) and how norms of practice speak to, for, and over individuals. The Faculty and Staff Standpoints project is shaped by this methodology, as it explores writing center staff and faculty relationships to their work. (Contains 10…

  17. Do staff nurse perceptions of nurse leadership behaviors influence staff nurse job satisfaction? The case of a hospital applying for Magnet® designation.

    Science.gov (United States)

    Bormann, Lorraine; Abrahamson, Kathleen

    2014-04-01

    Nurse managers leadership behaviors influence the job satisfaction of staff nurses. Transformational leadership is 1 of the 5 components associated with the Magnet Recognition Program®. The aim of this study was to examine the relationship between staff nurse perception of nurse manager leadership behavior and staff nurse job satisfaction in a hospital on the Magnet® journey and the influence of nurse manager leadership style on staff nurse job satisfaction. A descriptive, correlational design using a self-report survey with convenience sampling was used for this quantitative research study. Staff nurses completed the Multifactor Leadership Questionnaire 5X Short Form, the Abridged Job Descriptive Index survey, and a demographic questionnaire. Pearson correlations and regression analyses were completed to explore the relationship and influence of nurse manager leadership style on staff nurse job satisfaction. Transformational and transactional leadership styles of nurse managers were positively related to staff nurse overall job satisfaction and satisfaction with opportunity for promotion. Passive-avoidant leadership style of nurse managers was negatively related to staff nurse satisfaction with work, promotion, supervision, and coworker. Satisfaction with nurse manager leadership was a positive influence on overall nurse job satisfaction when separately controlling for the influence of each leadership style. Transformational and transactional leadership styles should be taught and encouraged among nurse managers to positively influence the job satisfaction of staff nurses.

  18. Impact of engaging middle management in practice interventions on staff support and learning culture: a quasi-experimental design.

    Science.gov (United States)

    Henderson, Amanda; Burmeister, Liz; Schoonbeek, Sue; Ossenberg, Christine; Gneilding, Julieanne

    2014-11-01

    This study evaluated the impact of different levels of engaging middle management in ward based strategies implemented by a project educator. The challenge for learning in practice is to develop effective teams where experienced staff engage and foster learning with students and other novice staff. A quasi-experimental pre- and post- intervention four group design was conducted from November 2009 to May 2010 across four general surgical and four general medical inpatient matched units in two settings in South East Queensland, Australia. Staff survey data was used to compare control and intervention groups (one actively engaging nurse managers) before and after 'practice learning' interventions. The survey comprised demographic data and data from two validated scales (support instrument for nurses facilitating learning and clinical learning organisational culture). Number of surveys returned pre- and post-intervention was 336 from 713 (47%). There were significant differences across many subscales pertaining to staff perception of support in the intervention groups, with only one change in the control group. The number of significant different subscales in the learning culture was also greater when middle management supported the intervention. Middle management should work closely with facilitators to assist embedding practice interventions. © 2013 John Wiley & Sons Ltd.

  19. The Training Project of Star Researchers, Outstanding Teaching Staff and Leaders with Facilities Available

    Directory of Open Access Journals (Sweden)

    Ömer KARAHAN

    2015-12-01

    Full Text Available There is a general consensus on the requirement of a serious regulation at our universities. It is argued that it is necessary to change Constitution and Institution of Higher Education Law for the serious regulation. However, it is impossible to say that all the facilities of the present legislation are used. Our aim is to create a project based on benefiting from continuing education centers to meet the need of star researchers, outstanding teaching staff and leaders in Turkey via the legislation in force. In this study, accessible studies from publications related to university, higher education and continuing education centers are studied. Th e current situation and solution off ers, applications and continuing education centers'activities have been determined. In accordance with these data, solution off ers have been proposed and discussed in line with the literature. According to the data obtained, our students who come with deficiencies from high schools to universities are not given the adequate undergraduate, graduate and postgraduate education. Th ere are studies such as ‘Double Major Program', ‘Medical-Science Physicians Integrated (MD-PhD Doctorate Program which upgrade the qualities. However, these programs are not suff icient and common. Th erefore, it is imposssible to train outstanding teaching staff , star researchesr and leaders who will meet the needs of our country and contribute to the World. Our academic potential needs a quality training except for branch training. On the other hand, the contribution of the Continuing Education Centers existing in university embodiments is limited. It is possible to provide basic skills, integration and research education to the outstanding teaching staff , star researcher and leader candidates. Th ese trainings should be given in a continuous instutionalization and in the formal education system. For this purpose, an academician school can be established within the body continuing

  20. Staff Group Trainer: Development of a Computer-Driven, Structured, Staff Training Environment

    National Research Council Canada - National Science Library

    Koger, Milton

    1998-01-01

    .... The project produced two training support packages (TSP)--battalion and brigade--designed to train these staffs to more effectively and efficiently communicate within and between staff sections, command post, and the unit commander...

  1. Design methodology and projects for space engineering

    Science.gov (United States)

    Nichols, S.; Kleespies, H.; Wood, K.; Crawford, R.

    1993-01-01

    NASA/USRA is an ongoing sponsor of space design projects in the senior design course of the Mechanical Engineering Department at The University of Texas at Austin. This paper describes the UT senior design sequence, consisting of a design methodology course and a capstone design course. The philosophical basis of this sequence is briefly summarized. A history of the Department's activities in the Advanced Design Program is then presented. The paper concludes with a description of the projects completed during the 1991-92 academic year and the ongoing projects for the Fall 1992 semester.

  2. Systematic design for trait introgression projects

    OpenAIRE

    Cameron, John N.; Han, Ye; Wang, Lizhi; Beavis, William D.

    2017-01-01

    Key message Using an Operations Research approach, we demonstrate design of optimal trait introgression projects with respect to competing objectives. Abstract We demonstrate an innovative approach for designing Trait Introgression (TI) projects based on optimization principles from Operations Research. If the designs of TI projects are based on clear and measurable objectives, they can be translated into mathematical models with decision variables and constraints that can be translated into ...

  3. Risk Management System and Project Staff Education Program for Overseas Construction Project Using the Expert System

    OpenAIRE

    Hirota, Yoichi

    2007-01-01

    The turnover of the Japanese contractors and the consulting firms has kept the same level since 1983, in spite of the fact that the size of domestic market is shrinking. This is why they do not have a proper management system, especially risk management system for the overseas construction projects. This study aims at building risk management system and developing education program that can be applied to reinforcing the ability, based on the author’s experience. Risk is defined as “uncertain ...

  4. Interior design preferences of residents, families, and staff in two nursing homes.

    Science.gov (United States)

    Miller, D B; Goldman, L E; Woodman, S A

    1985-01-01

    The small number of respondents and the absence of specific demographic data concerning the three categories of respondents represented definite limitations. Further investigation in other long-term care facilities clearly is indicated. However, as a preliminary survey of preferences in nursing home interior design, several interesting findings have emerged: Patients, staff and families all emphasized patient safety and function over aesthetics. Yet, more residents than staff and families were concerned with appearance. Although experts advocate creating a home-like atmosphere in the nursing home, 50% or more of each group applied different criteria for specific design elements for private homes and for long-term care institutions. Design preferences for the three groups were similar, with an emphasis on modern furniture, painted walls, resilient tile rather than carpet, blinds, pastel and warm colors, and the use of paintings as accessories. Contrary to study assumptions, design features that promote patient individuality (e.g., patient artwork) received much greater emphasis from staff than from patients and families. Environmental change was considered an important aspect of interior design. Of the three constituencies, staff was most aware of periodic changes in decor and considered change as "very important" more often than did families or patients. As the nature of the nursing home patient population has changed--with residents presenting more disability and less rehabilitation potential and less likelihood of returning home--the ambiance of facilities has assumed even more importance. Clearly, the design preferences of residents who live in the facility are of paramount importance. However, it is also helpful to have an environment that is pleasing to family members who often experience difficulty in ongoing visitations, particularly to intellectually impaired relatives. Maintaining staff morale at a high level is a constant challenge in a long-term care

  5. Information Flows in Networked Engineering Design Projects

    DEFF Research Database (Denmark)

    Parraguez, Pedro; Maier, Anja

    Complex engineering design projects need to manage simultaneously multiple information flows across design activities associated with different areas of the design process. Previous research on this area has mostly focused on either analysing the “required information flows” through activity...... networks at the project level or in studying the social networks that deliver the “actual information flow”. In this paper we propose and empirically test a model and method that integrates both social and activity networks into one compact representation, allowing to compare actual and required...... information flows between design spaces, and to assess the influence that these misalignments could have on the performance of engineering design projects....

  6. 77 FR 74195 - Draft Guidance for Industry and Food and Drug Administration Staff; Design Considerations for...

    Science.gov (United States)

    2012-12-13

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2012-D-1161] Draft Guidance for Industry and Food and Drug Administration Staff; Design Considerations for Devices Intended for Home Use; Availability AGENCY: Food and Drug Administration, HHS. ACTION: Notice. SUMMARY: The...

  7. Research oriented projects on design themese

    DEFF Research Database (Denmark)

    Tollestrup, Christian; Eriksen, Kaare; Ovesen, Nis

    2011-01-01

    How can design students do research-oriented projects about design themes? At the 3rd semester at the Industrial Design Master Program at Aalborg University this is done by taking research oriented learning objectives on design theories and methods and combining them with experimental case studie...... and professional self-reflection amongst students are improved....

  8. Sustainable Smart Grid Project Design

    International Nuclear Information System (INIS)

    Szabo, I.

    2014-01-01

    Living together with the SG project generation issues in the last years a significant conclusion revealed from the unknown universe. Technology is not the missing condition for a real-time working country-wide SG power system realization. Technologies are developed, and 'SG-ready'. Engineering society is waiting for the signal to jump till the Moon or even farther. There are technical discussions about SG technologies. All there are marginal (ie. network safety issues, metering issues, electromobility etc.) and projects are mostly targeting the industrial players which obviously want to sell their utmost technologies taking generally not into consideration the overall social interests. The most anticipated question is: Who owns the social responsibility of the future (and as a part of it) its contemporary electric power utility system's responsibility? What should happen in order to start real development of 21st century's power system? How to open eyes of decision makers and energy institutions? Are these auxiliary SG projects natural evolution of the final solutions and systems? (author).

  9. Balancing Design Project Supervision and Learning Facilitation

    DEFF Research Database (Denmark)

    Nielsen, Louise Møller

    2012-01-01

    experiences and expertise to guide the students’ decisions in relation to the design project. This paper focuses on project supervision in the context of design education – and more specifically on how this supervision is unfolded in a Problem Based Learning culture. The paper explores the supervisor......’s balance between the roles: 1) Design Project Supervisor – and 2) Learning Facilitator – with the aim to understand when to apply the different roles, and what to be aware of when doing so. This paper represents the first pilot-study of a larger research effort. It is based on a Lego Serious Play workshop......In design there is a long tradition for apprenticeship, as well as tradition for learning through design projects. Today many design educations are positioned within the University context, and have to be aligned with the learning culture and structure, which they represent. This raises a specific...

  10. Effects of newly designed hospital buildings on staff perceptions : a pre-post study to validate design decisions

    NARCIS (Netherlands)

    Schreuder, E.J.A.; Heel, L. van; Goedhart, R.; Dusseldorp, E.; Schraagen, J.M.C.; Burdorf, A.

    2015-01-01

    Objective: This study investigates effects of the newly built nonpatient-related buildings of a large university medical center on staff perceptions and whether the design objectives were achieved. Background: The medical center is gradually renewing its hospital building area of 200,000 m.(2) This

  11. Design in mind: eliciting service user and frontline staff perspectives on psychiatric ward design through participatory methods.

    Science.gov (United States)

    Csipke, Emese; Papoulias, Constantina; Vitoratou, Silia; Williams, Paul; Rose, Diana; Wykes, Til

    2016-01-01

    Psychiatric ward design may make an important contribution to patient outcomes and well-being. However, research is hampered by an inability to assess its effects robustly. This paper reports on a study which deployed innovative methods to capture service user and staff perceptions of ward design. User generated measures of the impact of ward design were developed and tested on four acute adult wards using participatory methodology. Additionally, inpatients took photographs to illustrate their experience of the space in two wards. Data were compared across wards. Satisfactory reliability indices emerged based on both service user and staff responses. Black and minority ethnic (BME) service users and those with a psychosis spectrum diagnosis have more positive views of the ward layout and fixtures. Staff members have more positive views than service users, while priorities of staff and service users differ. Inpatient photographs prioritise hygiene, privacy and control and address symbolic aspects of the ward environment. Participatory and visual methodologies can provide robust tools for an evaluation of the impact of psychiatric ward design on users.

  12. Extending Sociotechnical Design to Project Conception

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    2011-01-01

    Project management processes offer specific sites for understanding the interplay of the social and the technical. This article focuses on the connection between knowledge and technology through knowledge communication processes, cultural & rhetorical contexts in projects, and the iterative process...... and the Aarhus School of Business, University of Aarhus, Denmark. The analysis demonstrates the potential of knowledge communication concepts for social technical design and highlights the cultural context of the designers as a key factor to consider in socio-technical design....

  13. UMTRA project: Canonsburg final design

    International Nuclear Information System (INIS)

    Thiers, G.R.; Guros, F.B.; Smith, E.S.

    1984-01-01

    Final design for on-site stabilization of over 300,000 cubic yards of abandoned mill tailings in Canonsburg, Pennsylvania, is being completed this Fall. This paper describes design criteria, design procedures, and difficulties encountered for the following required elements: 1. Encapsulation cell; 2. Durability of erosion protection material; 3. Flood control berm; 4. Sedimentation pond; 5. Wastewater treatment plant. The 70,000 cubic yards of the tailings for which radiation levels exceed 100 picocuries per gram will be placed on a 2-ft-thick compacted clay liner and encased by a 3-ft-thick compacted clay cover. The remaining tailings will be covered with at least two feet of clay to prevent radon escape and to reduce rainfall infiltration. Erosion protection will be provided for the encapsulation cell, the drainage swales, and from potential meandering of nearby Chartiers Creek

  14. Extending Sociotechnical design to project conception

    DEFF Research Database (Denmark)

    Kampf, Constance

    2009-01-01

    between knowledge and technology through knowledge communication processes, cultural and rhetorical contexts. This connection is examined from a process point of view through the development of project goals and objectives to situate technology. The data comes from a Project Management course in which...... the students were asked to design and plan projects to situate a mobile phone game in the social context around a museum in Helsinki or their online course management system.   The paper traces the evolution of students' project goals and objectives with respect to knowledge communication theory, demonstrating...... the potential of knowledge communication concepts for socio-technical design processes, as well as the implications of socio-technical design processes in extending our understanding of knowledge communication. Keywords: Knowledge Communication, Knowledge Management, Socio-Technical Design, Project Management....

  15. Front-office staff can improve clinical tobacco intervention: health coordinator pilot project.

    Science.gov (United States)

    Bass, Frederic; Naish, Brigham; Buwembo, Isaac

    2013-11-01

    To learn whether front-line personnel in primary care practices can increase delivery of clinical tobacco interventions and also help smokers address physical inactivity, at-risk alcohol use, and depression. Uncontrolled before-and-after design. Vancouver, BC, area (4 practices); northern British Columbia (2 practices). Six practices, with 1 staff person per practice serving as a "health coordinator" who tracked and, after the baseline period, delivered preventive interventions to all patients who smoked. To assess delivery of preventive interventions, each practice was to sample 300 consecutive patient records, both at baseline and at follow-up 15 months later. Front-office staff were recruited, trained, paid, and given ongoing support to provide preventive care. Clinicians supplemented this care with advice and guided the use of medication. Effectiveness of the intervention was based on comparison, at baseline and at follow-up, of the proportion of patients with any of the following 6 proven intervention components documented in their medical records: chart reminder, advice received, self-management plan, target quit date, referral, and follow-up date (as they applied to tobacco, physical inactivity, at-risk alcohol use, and depression). A Tobacco Intervention Flow Sheet cued preventive care, and its data were entered into a spreadsheet (which served as a smokers' registry). Qualitative appraisal data were noted. For tobacco, substantial increases occurred after the intervention period in the proportion of patients with each of the intervention components noted in their charts: chart reminder (20% vs 94%); provision of advice (34% vs 79%); self-management plan (14% vs 57%); target quit date (5% vs 11%); referral (6% vs 11%); and follow-up date (7% vs 42%). Interventions for physical inactivity and depression showed some gains, but there were no gains for at-risk alcohol use. Front-line staff, patients, and clinicians were enthusiastic about the services offered

  16. Visualizing Practices in Project-based Design

    DEFF Research Database (Denmark)

    Whyte, Jennifer; Tryggestad, Kjell; Comi, Alice

    2016-01-01

    Project-based design involves a variety of visual representations, which are evolved to make decisions and accomplish project objectives. Yet, such mediated and distributed ways of working are difficult to capture through ethnographies that examine situated design. A novel approach is developed t...... representations enabled participants in project-based design to develop and share understanding. The complexity of projects and their distributed and mediated nature makes this approach timely and important in addressing new research questions and practical challenges.......Project-based design involves a variety of visual representations, which are evolved to make decisions and accomplish project objectives. Yet, such mediated and distributed ways of working are difficult to capture through ethnographies that examine situated design. A novel approach is developed...... of situated design. This allows the researcher to be nimble, tracing connections across complex engineering projects; reconstructing practices through their visual representations; and observing their effects. Second, it articulates how, in these empirical cases, interaction with a cascade of visual...

  17. Using life cycle assessment in design for environment education of product development staff

    Energy Technology Data Exchange (ETDEWEB)

    Jauhiainen, H. [Vaisala Oyj, Helsinki (Finland); Kaipainen, J.; Ristolainen, E.; Valkama, J. [Tampere Univ. of Technology, Inst. of Electronics, Tampere (Finland)

    2004-07-01

    The environmental information of the whole life cycle of a product is needed in design for environment (DfE). Therefore, LCA results are possible starting points for the DfE, but the results need to be summarized for a company staff in DfE education. The reliability of results must be taken into consideration, particularly when going into the details of a product. Those issues were examined when the manufacturing phase of the product of Vaisala company was assessed using two different LCA software tools and inventory databases. Differences between the methods and data had an influence on differences of the results. Comparing of those differences helped to show the main reliability issues of LCA for the staff. It was found out that as a background the LCA results were sufficient, whereas LCA based design rules needed further simplification of the results. In that connection, reliability issues and increased subjectivity must be emphasized. (orig.)

  18. Staff Technical Position on consideration of fault displacement hazards in geologic repository design

    International Nuclear Information System (INIS)

    McConnell, K.I.; Lee, M.P.

    1994-09-01

    Nuclear Regulatory Commission regulations for the disposal of spent nuclear fuel and high-level radioactive waste in a geologic repository recognize that fault displacement is a potentially adverse condition. However, they do not prohibit designing the geologic repository against the effects of such a potentially adverse condition. This Staff Technical Position recognizes the acceptability of designing the geologic repository to take into account the attendant effects (e.g., displacement) of faults of regulatory concern and expresses the staff's views on what is needed from the US Department of Energy if it chooses to locate structures, systems, and components important to safety or important to waste isolation in areas that contain faults of regulatory concern

  19. Project Excel: A Model for an Individually Focused Staff Development Program.

    Science.gov (United States)

    Minix, Nancy A.; Pearce, Winston Thomas

    A description is given of the development and implementation of an inservice program, "Project Excel," which was designed in accordance with andragogical theory. This theory is based upon four major assumptions: (1) as people grow, they become increasingly self-directed; (2) as people grow, a reservoir of experiences which provide a…

  20. Systematic design for trait introgression projects.

    Science.gov (United States)

    Cameron, John N; Han, Ye; Wang, Lizhi; Beavis, William D

    2017-10-01

    Using an Operations Research approach, we demonstrate design of optimal trait introgression projects with respect to competing objectives. We demonstrate an innovative approach for designing Trait Introgression (TI) projects based on optimization principles from Operations Research. If the designs of TI projects are based on clear and measurable objectives, they can be translated into mathematical models with decision variables and constraints that can be translated into Pareto optimality plots associated with any arbitrary selection strategy. The Pareto plots can be used to make rational decisions concerning the trade-offs between maximizing the probability of success while minimizing costs and time. The systematic rigor associated with a cost, time and probability of success (CTP) framework is well suited to designing TI projects that require dynamic decision making. The CTP framework also revealed that previously identified 'best' strategies can be improved to be at least twice as effective without increasing time or expenses.

  1. Various advanced design projects promoting engineering education

    Science.gov (United States)

    1994-01-01

    The Universities Space Research Association (USRA) Advanced Design Program (ADP) program promotes engineering education in the field of design by presenting students with challenging design projects drawn from actual NASA interests. In doing so, the program yields two very positive results. Firstly, the students gain a valuable experience that will prepare them for design problems with which they will be faced in their professional careers. Secondly, NASA is able to use the work done by students as an additional resource in meeting its own design objectives. The 1994 projects include: Universal Test Facility; Automated Protein Crystal Growth Facility; Stiffening of the ACES Deployable Space Boom; Launch System Design for Access to Space; LH2 Fuel Tank Design for SSTO Vehicle; and Feed System Design for a Reduced Pressure Tank.

  2. Reference Design Project Book: NUSEL-Homestake

    OpenAIRE

    Haxton, W. C.

    2003-01-01

    This submission includes the overview, science timeline, reference design, WBS, and mine status sections of the Homestake collaboration's Reference Design Project Book. The Project Book describes the specific plan for converting the Homestake Gold Mine into a facility for physics, earth science, and engineering. The proposed developments on the 7400- and 4850-ft levels are presented, along with the plans for adapting Homestake's existing infrastructure for science. The plan differs substantia...

  3. Project management in interior design services

    OpenAIRE

    Şahinoglu, Alp

    1997-01-01

    Ankara : Bilkent University, Department of Interior Architecture and Environmental Design and Institute of Fine Arts, 1997. Thesis (Master's) -- Bilkent University, 1997. Includes bibliographical references. In this study, the concept of project management is analyzed within the framework of interior design services. Project management has been defined as the managing and coordination of all human and physical resources, in order to accomplish the predetermined goals (aim of the proj...

  4. Student design projects in applied acoustics.

    Science.gov (United States)

    Bös, Joachim; Moritz, Karsten; Skowronek, Adam; Thyes, Christian; Tschesche, Johannes; Hanselka, Holger

    2012-03-01

    This paper describes a series of student projects which are intended to complement theoretical education in acoustics and engineering noise control with practical experience. The projects are also intended to enhance the students' ability to work in a team, to manage a project, and to present their results. The projects are carried out in close cooperation with industrial partners so that the students can get a taste of the professional life of noise control engineers. The organization of such a project, its execution, and some of the results from the most recent student project are presented as a demonstrative example. This latest project involved the creation of noise maps of a production hall, the acoustic analysis of a packaging machine, and the acoustic analysis of a spiral vibratory conveyor. Upon completion of the analysis, students then designed, applied, and verified some simple preliminary noise reduction measures to demonstrate the potential of these techniques. © 2012 Acoustical Society of America

  5. Learning from participatory design projects across industries

    DEFF Research Database (Denmark)

    Broberg, Ole; Souza da Conceição, Carolina

    2017-01-01

    Summative Statement: A preliminary framework for participatory design projects (PDP) was developed based on a retrospective analysis of five PDPs across different industries. The framework may serve as a guidance for planning and conducting PDPs. Problem statement: A growing number of experiences...... with participatory design or participatory ergonomics projects have been gained within the field of macro-ergonomics. It is suggested that the Participatory Ergonomics Framework (PEF) validated by Haines et al. (2002) needs to be updated based on these experiences and hence more focussed on design activities....... Research Objective / Question: The objective of this study was to update and design-orient the PEF based on experiences with PDPs within the last ten years. Methodology: Five participatory design projects across different industries were systematically analyzed and compared in order to develop a framework...

  6. Design project management mode as the introduction

    International Nuclear Information System (INIS)

    Zhang Xiaoping

    2014-01-01

    This article consider nuclear power plant's current design schedule management mode as the introduction, analysis of current management in-depth, summed up the advantage and disadvantage of the existing management mode. It makes use of mature closed loop cycle project management, and submits progress tracking model assumptions. It also introduces the purpose and background of the progress automation model, the theoretical assumptions of the model, the design criteria and evaluation system of indicators of progress. Based on the achievement process model, this article mainly discusses the specific processes and key points of the project closed loop cycle, and the improvement of the process of project management. (author)

  7. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  8. Post-Occupancy Evaluation of a Mental Healthcare Facility Based on Staff Perceptions of Design Innovations.

    Science.gov (United States)

    Kalantari, Saleh; Snell, Robin

    2017-07-01

    This study was a post-occupancy evaluation (POE) to examine the effectiveness of three specific design innovations in a mental healthcare facility. In addition to collecting data about the impact of these specific designs, the study provides a model for the broader implementation of POE approaches in the mental healthcare context. POEs in general healthcare settings have been shown to lead to better work environments and better outcomes for patients. Despite growing evidence of the value provided by POE studies, the industry has been somewhat slow to adopt their regular use, in part due to unfamiliarity with the POE process. This is particularly true in mental healthcare contexts, where POE studies remain virtually nonexistent. In-depth interviews and a widely distributed, anonymous survey were used to collect hospital staff perceptions and feedback regarding the impact of specific design features. The hospital staff were quite enthusiastic about two of the design innovations studied here (a new wayfinding strategy and the use of vibrant colors in specific areas of the facility). The third innovation, open-style communication centers, elicited more mixed evaluations. The results include extensive hypothesis testing about the effects of each innovation as well as narrative discussions of their pros and cons. The study generated new knowledge about three specific mental healthcare design innovations and provides a model for the practical implementation of a POE approach in mental healthcare contexts. The results are particularly relevant for designers who are considering innovative strategies in future mental healthcare facilities.

  9. Project Management Approaches for Online Learning Design

    Science.gov (United States)

    Eby, Gulsun; Yuzer, T. Volkan

    2013-01-01

    Developments in online learning and its design are areas that continue to grow in order to enhance students' learning environments and experiences. However, in the implementation of new technologies, the importance of properly and fairly overseeing these courses is often undervalued. "Project Management Approaches for Online Learning Design"…

  10. Capstone Engineering Design Projects for Community Colleges

    Science.gov (United States)

    Walz, Kenneth A.; Christian, Jon R.

    2017-01-01

    Capstone engineering design courses have been a feature at research universities and four-year schools for many years. Although such classes are less common at two-year colleges, the experience is equally beneficial for this population of students. With this in mind, Madison College introduced a project-based Engineering Design course in 2007.…

  11. Design and validation of a questionnaire to measure the attitudes of hospital staff concerning pandemic influenza.

    Science.gov (United States)

    Naghavi, Seyed Hamid Reza; Shabestari, Omid; Roudsari, Abdul V; Harrison, John

    2012-03-01

    When pandemics lead to a higher workload in the healthcare sector, the attitude of healthcare staff and, more importantly, the ability to predict the rate of absence due to sickness are crucial factors in emergency preparedness and resource allocation. The aim of this study was to design and validate a questionnaire to measure the attitude of hospital staff toward work attendance during an influenza pandemic. An online questionnaire was designed and electronically distributed to the staff of a teaching medical institution in the United Kingdom. The questionnaire was designed de novo following discussions with colleagues at Imperial College and with reference to the literature on the severe acute respiratory syndrome (SARS) epidemic. The questionnaire included 15 independent fact variables and 33 dependent measure variables. A total of 367 responses were received in this survey. The data from the measurement variables were not normally distributed. Three different methods (standardized residuals, Mahalanobis distance and Cook's distance) were used to identify the outliers. In all, 19 respondents (5.17%) were identified as outliers and were excluded. The responses to this questionnaire had a wide range of missing data, from 1 to 74 cases in the measured variables. To improve the quality of the data, missing value analysis, using Expectation Maximization Algorithm (EMA) with a non-normal distribution model, was applied to the responses. The collected data were checked for homoscedasticity and multicollinearity of the variables. These tests suggested that some of the questions should be merged. In the last step, the reliability of the questionnaire was evaluated. This process showed that three questions reduced the reliability of the questionnaire. Removing those questions helped to achieve the desired level of reliability. With the changes proposed in this article, the questionnaire for measuring staff attitudes concerning pandemic influenza can be converted to a

  12. Instructional Design "Postpartum Fitness” for Midwife Staff of Shemiranat (Tehran, Iran Health Network

    Directory of Open Access Journals (Sweden)

    Rita Rahmati Roodsari

    2018-01-01

    Full Text Available Background: One of the postpartum cares lives is supporting and encouraging them more to exercise after delivery and monitoring them. Health care workers, particularly midwives have a great role in the promotion of sport activity. Purpose of this study is Designed training for "postpartum fitness" by Roth well approach for midwives at health network in Shemiranat.Materials and Methods: This research is kind of Instructional design. Sampling was done by using census method Data collection was done by multiple choice tests for knowledge and attitudes of questionnaire and practical assessment exercise was part. After assessment and instructional design and was done Roth well model and Ganyh strategies.Results: Average response to questions in the cognitive domain was 49%. In this study 92% of the employees have positive attitude to importance and impact of the study. The result of the data related to the workplace of participants is health centers (53.3%. Most frequency is for who has less than 5 years’ work experience (50%and most frequency is for official staff (43.3%, most educational level related to bachelors (83.3% and the highest age rate is between 30-40 years old (40%.Conclusion: Positive attitude towards this issue and earn score below %80 indicates a need for staff to learn and raise awareness about the above topic. Create knowledge, training, counseling mothers about this issue are the midwife duties. This reflects a greater emphasis on design education.

  13. Use of a dementia training designed for nurse aides to train other staff.

    Science.gov (United States)

    Irvine, A Blair; Beaty, Jeff A; Seeley, John R; Bourgeois, Michelle

    2013-12-01

    Problematic resident behaviors may escalate in long-term care facilities (LTCs). If nurse aides (NAs) are not nearby, the nearest staff to intervene may be non-direct care workers (NDCWs), who have little or no dementia training. This pilot research tested Internet dementia-training program, designed for NAs, on NDCWs in a LTC setting. Sixty-eight NDCWs participated, filling out two baseline surveys at 1-month intervals and a posttest survey after training. The surveys included video-situation testing, items addressing psychosocial constructs associated with behavior change, and measures training-acceptance. Paired t tests showed significant positive effects on measures of knowledge, attitudes, self-efficacy, and behavioral intentions, with small-moderate effect sizes. Nursing staff as well as non-health care workers showed improved scores, and the web-site training program was well received by all participants. These results suggest that Internet training may allow staff development coordinators to conserve limited resources by cross-training of different job categories with the same program.

  14. How do I manage and staff for intelligent transportation systems? : thinking outside the box : a cross-cutting study : maximizing project resources and advancing coordination

    Science.gov (United States)

    2000-08-01

    Intelligent transportation systems (ITS) projects often need staff with skills that are not resident in traditional transportation organizations. Therefore, project administrators must sometimes look beyond the usual staffing methods to fill these po...

  15. Tying the Design of Your Camp Staff Training to the Delivery of Desired Youth Outcomes

    Science.gov (United States)

    Galloway, Robin; Bourdeau, Virginia; Arnold, Mary; Nott, Brooke D.

    2013-01-01

    As experience camp directors, we've seen the challenges faced by young camp counselors and inexperienced staff. Evaluations from staff at many camps motivated us to help our people be more effective with their campers. In response we created a comprehensive camp staff training. Lessons showed staff what we wanted them to do and say as they…

  16. Core designs of modern VVER projects

    International Nuclear Information System (INIS)

    Vasilchenko, I.; Kushmanov, S.; Vjalitsyn, V.; Vasilchenko, R.

    2015-01-01

    The presented operational experience of TVS - 2M (pilot-commercial operation started in 2006 at Balakovo NPP -1) enables to use it as reference for new projects because of similarity in designs and operational conditions. In the paper main parameters of fuel cycles, stability to impact of damaging factors, pilot operation of MG, new alloys, ADF and NTMC, upgrade of FA - 2M for the further power uprating, profiling of Gd-fuel rods for 18-month Fuel Cycle (FC) and perfection of absorber element design are the discussed issues. At the end author concluded that: 1) Core designs of new projects AES-2006 and VVER-TOI are based on extensive successful operational experience of the close prototype of TVS - 2M. 2) All improvements both of technical and economic parameters of fuel are subjected to representative examination by pilot operation at the power units with VVER-1000 being close prototypes of new designs

  17. Impact of design of installations and in the personal staff formation of the hybrid equipment: PET-CT

    International Nuclear Information System (INIS)

    Hernandez, R.; Soler, K.; Alonso, I.

    2013-01-01

    In this article the general principles to be considered in the design of a Nuclear Medicine department with PET-CT, and address the existing problems regarding training needs and staff training, to take on this new technology

  18. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  19. Designing and Conducting Health Systems Research Projects ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Home · Resources · Publications. Designing and Conducting Health Systems Research Projects Volume 1: Proposal Development and Fieldwork ... IDRC and the United Kingdom's Global AMR Innovation Fund—managed by the ... New website will help record vital life events to improve access to services for all.

  20. Project Design Concept - Primary Ventilation System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    Tank Farm Restoration and Safe Operation (TFRSO), Project W-3 14 was established to provide upgrades that would improve the reliability and extend the system life of portions of the waste transfer, electrical, ventilation, instrumentation and control systems for the Hanford Site Tank Farms. An assessment of the tank farm system was conducted and the results are documented in system assessment reports. Based on the deficiencies identified in the tank farm system assessment reports, and additional requirements analysis performed in support of the River Protection Project (RPP), an approved scope for the TFRSO effort was developed and documented in the Upgrade Scope Summary Report (USSR), WHC-SD-W314-RPT-003, Rev. 4. The USSR establishes the need for the upgrades and identifies the specific equipment to be addressed by this project. This Project Design Concept (PDC) is in support of the Phase 2 upgrades and provides an overall description of the operations concept for the W-314 Primary Ventilation Systems. Actual specifications, test requirements, and procedures are not included in this PDC. The PDC is a ''living'' document, which will be updated throughout the design development process to provide a progressively more detailed description of the W-314 Primary Ventilation Systems design. The Phase 2 upgrades to the Primary Ventilation Systems shall ensure that the applicable current requirements are met for: Regulatory Compliance; Safety; Mission Requirements; Reliability; and Operational Requirements

  1. Staff Nurse Perceptions of Open-Pod and Single Family Room NICU Designs on Work Environment and Patient Care.

    Science.gov (United States)

    Winner-Stoltz, Regina; Lengerich, Alexander; Hench, Anna Jeanine; OʼMalley, Janet; Kjelland, Kimberly; Teal, Melissa

    2018-06-01

    Neonatal intensive care units have historically been constructed as open units or multiple-bed bays, but since the 1990s, the trend has been toward single family room (SFR) units. The SFR design has been found to promote family-centered care and to improve patient outcomes and safety. The impact of the SFR design NICU on staff, however, has been mixed. The purposes of this study were to compare staff nurse perceptions of their work environments in an open-pod versus an SFR NICU and to compare staff nurse perceptions of the impact of 2 NICU designs on the care they provide for patients/families. A prospective cohort study was conducted. Questionnaires were completed at 6 months premove and again at 3, 9, and 15 months postmove. A series of 1-way analyses of variance were conducted to compare each group in each of the 8 domains. Open-ended questions were evaluated using thematic analysis. The SFR design is favorable in relation to environmental quality and control of primary workspace, privacy and interruption, unit features supporting individual work, and unit features supporting teamwork; the open-pod design is preferable in relation to walking. Incorporating design features that decrease staff isolation and walking and ensuring both patient and staff safety and security are important considerations. Further study is needed on unit design at a microlevel including headwall design and human milk mixing areas, as well as on workflow processes.

  2. The SOLS TICE Project: Satellite Television and Audioconferencing in Continuing Professional Development for LIS Staff.

    Science.gov (United States)

    Hughes, Alun; Priestley, John

    1992-01-01

    Describes SOLS TICE, the Satellite On-Line Searching Interactive Conferencing Experiment, conducted at the University of Plymouth (United Kingdom) to meet the training needs of staff in the library and information science (LIS) sector. Continuing professional development is discussed, instructional effectiveness and cost effectiveness are…

  3. Project designing of Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Krychtalek, Z.; Linek, V.

    1989-01-01

    The geological and seismic parameters are listed of the Temelin nuclear power plant. The division of the site in building zones is described. The main zones consist of the power generation unit zone with the related auxiliary buildings of hot plants and of the auxiliary buildings of the nonactive part with industrial buildings. The important buildings are interconnected with communication and technology bridges. Cooling towers and spray pools and the entrance area are part of the urbanistic design. The architectonic design of the buildings uses standard building elements and materials. The design of the buildings is based on the requirements on their function and on structural load and on the demands of maximal utilization of the type of the reinforced concrete prefab structure system. The structure is made of concrete or steel cells. The project design is based on Soviet projects. The layout is shown of the main power generation units and a section is presented of a 1,000 MW unit. (J.B.). 2 figs

  4. Designing the owner's nuclear project management organization

    International Nuclear Information System (INIS)

    Cooke, T.C.; Peck, B.H.

    1976-01-01

    Few decisions are more important to an electric utility company than the one to build a nuclear generating facility. This decision will require continuous management attention to the nuclear project for periods of up to ten years on the part of the utility. Effective management of such a large, complex project requires an owner's organization skilled in such areas as engineering, heavy construction, procurement, and project control. The paper describes a method for designing the owner's nuclear organization. Factors considered include the identification of milestone events and phases of the project and identification of key organizational groups and their degree of involvement. A series of important decision milestones is also identified for structuring the organization. A step-by-step analysis involving a set of evaluation criteria results in a recommended organization that can be staffed by the owner according to the degree of involvement desired. This technique of analysis could also be performed using different evaluation criteria resulting in other options for the owner's organization

  5. 76 FR 17160 - Office of New Reactors; Final Interim Staff Guidance on the Review of Nuclear Power Plant Designs...

    Science.gov (United States)

    2011-03-28

    ... design certification (DC) application for new nuclear power reactors under Title 10 of the Code of... NUCLEAR REGULATORY COMMISSION [NRC-2010-0033; DC/COL-ISG-021] Office of New Reactors; Final Interim Staff Guidance on the Review of Nuclear Power Plant Designs Using a Gas Turbine Driven Standby...

  6. Systematic Management of Change Is the Key to Successful Staff Development. An Initial Study of the Bloomfield Public Schools Staff Development Project. Teacher Essentials, Styles & Strategies (TESS).

    Science.gov (United States)

    Celso, Nicholas; Morris, Harold

    Confronted by a maturing staff, lower teacher turnover rates, declining enrollments, and more sophisticated instructional methods, the Bloomfield (New Jersey) Public School District adopted an ambitious staff development initiative in 1983. This paper describes the planning and implementation strategies used to launch Bloomfield's Teaching…

  7. Design of inverters for the PHOTONERGY project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-08-01

    The PHOTONERGY project (the former SolcelleInverter project) was initiated on the 1st of September 2001, with a state-of-the-art analysis, which concluded into specifications. Based on this 23 topologies were analyzed in for efficiencies. The results from this analysis was five candidates which all showed a somewhat good efficiency. These five topologies were in further investigated by means of an initial design-iteration and simulations. Two different solutions were picked up in due to their high efficiency and low cost. 1. The standard full-bridge phase shifted DC/DC converter together with a standard DC/AC inverter, 2. A modified version of the novel Shimizu topology. A patent is pending on this modified version. These two inverters are in this document developed and made ready for prototyping. This includes design and selection of reactive- and switching-components, e.g. filter- and bulk-capacitors, low- and high-frequency inductors, high frequency transformers, MOSFETs and diodes. The design of auxiliary circuits is also included, e.g. gate drivers for the MOSFETs, measuring circuits for the grid-current and -voltage, PV-module-current and voltage, protection circuits, hardware near controllers and finally a switch mode power supply. However, the design of the various controllers, except the hardware near PV-current controller for the full bridge phase shifted converter, is not documented in this report but will come later on. This includes all controllers, e.g. maximum power point tracking for the PV-module, utility grid current controller, DC-link voltage controller, phase locked loops, and detection of islanding operation. All of these control loops are to be implemented in a micro-controller. (au)

  8. Project Design Concept for Monitoring and Control System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations

  9. Information Systems and Corporate Memory: design for staff turn-over

    Directory of Open Access Journals (Sweden)

    Colin Sharp

    1993-11-01

    Full Text Available The "information age" is reliant upon the information skill-base of people and the storage and access of complete data. Staff turn-over and "down-sizing" as well as the rate of organisational change places increased pressure on the designers of corporate information systems to keep up with the organizational demands. Especially relevant are the "soft" aspects of the corporate information needs of organizations. The term "corporate memory" is introduced to explain the relatively informal collective and individual knowledge of employees gained through their experience and position in the organization. This paper elaborates the issues concerned with the "corporate soft data", and makes suggestions for research, as well as for planners of corporate information systems in organizations facing major down-sizing or related changes. It is concluded that there are a number of readily obtainable sources of soft data in the organization and these data should be analysed for inclusion in system development. If organizations are to become learning systems and not just keep repeating the same mistakes, they need to review all aspects of corporate memory, especially the soft data sources and losses.

  10. 75 FR 5632 - Office of New Reactors; Interim Staff Guidance on the Review of Nuclear Power Plant Designs Using...

    Science.gov (United States)

    2010-02-03

    ... Management System (ADAMS) Accession No. ML092640035). This ISG provides new guidance information for applicants submitting a combined license (COL) or design certification (DC) for construction and operation of... (SRP), Section 8.3.1 and Sections 9.5.4 through 9.5.8. The NRC staff issues DC/COL-ISGs to facilitate...

  11. 34 CFR 637.13 - What are design projects?

    Science.gov (United States)

    2010-07-01

    ... EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of Projects Does the Secretary Assist Under This Program? § 637.13 What are design projects? (a) Design... 34 Education 3 2010-07-01 2010-07-01 false What are design projects? 637.13 Section 637.13...

  12. Impact of the design of neonatal intensive care units on neonates, staff, and families: a systematic literature review.

    Science.gov (United States)

    Shahheidari, Marzieh; Homer, Caroline

    2012-01-01

    Newborn intensive care is for critically ill newborns requiring constant and continuous care and supervision. The survival rates of critically ill infants and hospitalization in neonatal intensive care units (NICUs) have improved over the past 2 decades because of technological advances in neonatology. The design of NICUs may also have implications for the health of babies, parents, and staff. It is important therefore to articulate the design features of NICU that are associated with improved outcomes. The aim of this study was to explore the main features of the NICU design and to determine the advantages and limitations of the designs in terms of outcomes for babies, parents, and staff, predominately nurses. A systematic review of English-language, peer-reviewed articles was conducted for a period of 10 years, up to January 2011. Four online library databases and a number of relevant professional Web sites were searched using key words. There were 2 main designs of NICUs: open bay and single-family room. The open-bay environment develops communication and interaction with medical staff and nurses and has the ability to monitor multiple infants simultaneously. The single-family rooms were deemed superior for patient care and parent satisfaction. Key factors associated with improved outcomes included increased privacy, increased parental involvement in patient care, assistance with infection control, noise control, improved sleep, decreased length of hospital stay, and reduced rehospitalization. The design of NICUs has implications for babies, parents, and staff. An understanding of the positive design features needs to be considered by health service planners, managers, and those who design such specialized units.

  13. Systems approach for design control at Monitored Retrievable Storage Project

    International Nuclear Information System (INIS)

    Kumar, P.N.; Williams, J.R.

    1994-01-01

    This paper describes the systems approach in establishing design control for the Monitored Retrievable Storage Project design development. Key elements in design control are enumerated and systems engineering aspects are detailed. Application of lessons learned from the Yucca Mountain Project experience is addressed. An integrated approach combining quality assurance and systems engineering requirements is suggested to practice effective design control

  14. Public Library Staff as Community Health Partners: Training Program Design and Evaluation.

    Science.gov (United States)

    Morgan, Anna U; D'Alonzo, Bernadette A; Dupuis, Roxanne; Whiteman, Eliza D; Kallem, Stacey; McClintock, Autumn; Fein, Joel A; Klusaritz, Heather; Cannuscio, Carolyn C

    2018-05-01

    Public libraries are free and open to all-and accessed at high rates by vulnerable populations-which positions them to be key public health allies. However, library staff themselves often feel ill-equipped to address the health and social concerns of their patrons. To fill this gap, we developed a case-based training curriculum to help library staff recognize, engage, and refer vulnerable patrons to appropriate resources. Topics addressed in the training, including homelessness, mental health and substance use disorders, immigration, and trauma, were selected based on findings from a prior community needs assessment. Using a modified measure of self-efficacy, participants ( n = 33) were surveyed before and after each session. Several participants ( n = 7) were also interviewed 4 months after the training was completed. Overall, staff reported significant increases in comfort, confidence, and preparedness in assisting vulnerable patrons across all topic areas. Qualitative findings reflected positive perceived impact and value of the trainings. Staff felt training resources should be made more readily accessible. Improving library staff capacity to address the health and social needs of their patrons can further establish public libraries as partners in improving population health.

  15. Doing the Project and Learning the Content: Designing Project-Based Science Curricula for Meaningful Understanding

    Science.gov (United States)

    Kanter, David E.

    2010-01-01

    Project-based science curricula can improve students' usable or meaningful understanding of the science content underlying a project. However, such curricula designed around "performances" wherein students design or make something do not always do this. We researched ways to design performance project-based science curricula (pPBSc) to better…

  16. Southeast Region Headboat Survey-PPS Survey Design Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This dataset is a record of trips selected during pilot procedures for the PPS design project designed to track the port agents ability to follow the PPS design and...

  17. The feeling of family success and the professional burnout syndrome among penitentiary staff (a draft of a research project

    Directory of Open Access Journals (Sweden)

    Agnieszka Barczykowska

    2011-12-01

    Full Text Available Mutual relations between family and professional life have been for many years one of the most important fields of research in economics, sociology and, more and more often, pedagogy, which focuses on searching for factors protecting from the development of burnout syndrome and aims at increasing the effectiveness of pedagogic efforts. Due to the above, this article, being a draft of a research project, is dedicated to the facilitating effect of family life on professional life of the penitentiary staff. The authors take a stance that the feeling of satisfaction from family life can not only significantly neutralize the feeling of failure but, primarily, contribute to the search for more and more innovative forms of work.

  18. Knowledge management in design teams using a project website

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for

  19. Project Management in Instructional Design: ADDIE Is Not Enough

    Science.gov (United States)

    Van Rooij, Shahron Williams

    2010-01-01

    In the digital age, instructional designers must possess both a sound instructional design knowledge base and solid project management skills that will enable them to complete courseware projects on time, on budget and in conformance with client expectations. Project management skills include the ability to apply repeatable processes, along with…

  20. A Symbiosis between Instructional Systems Design and Project Management

    Science.gov (United States)

    Pan, Cheng-Chang

    2012-01-01

    This study is intended to explore a complementary relationship between instructional systems design (ISD) and project management in an attempt to build a plausible case for integrating project management as a distinct course in the core of the graduate instructional systems design programs. It is argued that ISD and project management should form…

  1. 23 CFR 710.313 - Design-build projects.

    Science.gov (United States)

    2010-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY AND ENVIRONMENT RIGHT-OF-WAY AND REAL ESTATE Project Development § 710.313 Design-build projects. (a) In the case of a design-build project, right-of-way must be acquired and cleared in accordance with the Uniform Relocation Assistance...

  2. The Design of Project Management Structural Organization

    OpenAIRE

    Dumitru Constantinescu; Cristian Etegan

    2007-01-01

    The relationships organization-suppliers-customers have recently known major changes in the structure of services and have made the organization develop its managerial and professional competencies in order to do projects. The qualified organization is the most trust-worthy in the process of doing a project. The participation of an organization in doing projects depends on a multitude of factors. Out of these factors, the structural organization comes forth, as it represents the variable with...

  3. GIS Project Design: Brainstorming & Ideation Workshop

    OpenAIRE

    Garofalo, Frank

    2015-01-01

    Who should attend: Do you have a new project or existing project, and looking to generate some new ideas? Come with a project in mind or just come to learn some new collaboration and brainstorming techniques. What participants will learn… techniques for: Working with others to create a common direction and vision, then generating alignment Evaluating current state situations, strengths, complications and implications Identifying and forming consensus on key target audiences Generating ide...

  4. The Virtual Design Team: Designing Project Organizations as Engineers Design Bridges

    Directory of Open Access Journals (Sweden)

    Raymond E. Levitt

    2012-08-01

    Full Text Available This paper reports on a 20-year program of research intended to advance the theory and practice of organization design for projects from its current status as an art practiced by a handful of consultants worldwide, based on their intuition and tacit knowledge, to: (1 an “organizational engineering” craft, practiced by a new generation of organizational designers; and (2 an attractive and complementary platform for new modes of “virtual synthetic organization theory research.” The paper begins with a real-life scenario that provided the motivation for developing the Virtual Design Team (VDT, an agent-based project organizational simulation tool to help managers design the work processes and organization of project teams engaged in large, semi-routine but complex and fast-paced projects. The paper sets out the underlying philosophy, representation, reasoning, and validation of VDT, and it concludes with suggestions for future research on computational modeling for organization design to extend the frontiers of organizational micro-contingency theory and expand the range of applicability and usefulness of design tools for project organizations and supply-chain networks based on this theory.

  5. The Design and Development of Staff Wellbeing Initiatives: Staff Stressors, Burnout and Emotional Exhaustion at Children and Young People's Mental Health in Australia.

    Science.gov (United States)

    Coates, Dominiek D; Howe, Deborah

    2015-11-01

    Mental health work presents problems for staff over and above those encountered in other organisations, including other areas of healthcare. Healthcare workers, in particular mental health workers, have poorer job satisfaction and higher job burnout and turnover compared with established norms for other occupational groups. To make sense of why healthcare workers experience high levels of burnout, a strong body of literature points to the emotionally demanding nature of people-work. The negative effects of mental health work on employee health can be mitigated by the provision of appropriate job resources and wellbeing initiatives. As to develop initiatives that appropriately target staff sources of stress and needs, it is important to engage staff in this process. As such, Children and Young People's Mental Health (CYPMH) and headspace Gosford, in Australia, New South Wales (NSW), developed a survey to identify how staff experience and manage the emotional demands of mental health work, what they identify as key stressors and which initiatives they would like to see implemented. Fifty-five staff (response rate of 73 %) completed the survey, and the results suggest that while staff find the work emotionally demanding, they do not appear to be emotionally exhausted and report administrative rather than client issues as their primary concerns. While a strong body of literature identifies the management of emotions in the workplace as a significant cause of stress, organisational stressors such as working in a bureaucratic environment are also important to understanding staff wellbeing.

  6. Estimating design costs for first-of-a-kind projects

    International Nuclear Information System (INIS)

    Banerjee, Bakul; Fermilab

    2006-01-01

    Modern scientific facilities are often outcomes of projects that are first-of-a-kind, that is, minimal historical data are available for project costs and schedules. However, at Fermilab, there was an opportunity to execute two similar projects consecutively. In this paper, a comparative study of the design costs for these two projects is presented using earned value methodology. This study provides some insights into how to estimate the cost of a replicated project

  7. Exploratory Shaft, Phase 1, Project B-314: Title 1 design report system design description

    International Nuclear Information System (INIS)

    Hanlen, D.F.

    1983-01-01

    The report describes the project and the project systems, the principal design bases, and principal hazards and project interfaces. This report also contains the Title 1 Estimate Summary. 5 figs., 8 tabs

  8. Solar hydrogen project - Thermochemical process design

    Energy Technology Data Exchange (ETDEWEB)

    Allen, D.J.; Ng, L.F.; Rao, M.S.M.; Wu, S.F.; Zoschak, R.J.

    1984-08-01

    The thermochemical decomposition of water using solar energy offers an elegant way of combining solar and chemical technologies to produce a high quality fuel. The DOE has sponsored Foster Wheeler to develop a process design for a solar water-splitting process based on the sulfuric acid/iodine cycle. The study has centered around the design of a sulfuric acid decomposition reactor and the central receiver. Materials' properties impose severe constraints upon the design of decomposition reactor. In this paper, the constraints imposed on the design are specified and a reactor and receiver design is presented together with a preliminary design of the balance of plant.

  9. Design and Co-design of Project-organized Studies

    DEFF Research Database (Denmark)

    Nielsen, Jørgen Lerche; Andreasen, Lars Birch

    2014-01-01

    The chapter contributes to discussions on design processes in relation to education, presenting different notions of design research and demonstrating how professors and students are involved together in designing innovative and constructive study processes that can help foster students' engagement...

  10. Project W-420 Stack Monitoring system upgrades conceptual design report

    International Nuclear Information System (INIS)

    TUCK, J.A.

    1998-01-01

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks

  11. Project W-420 Stack Monitoring system upgrades conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    TUCK, J.A.

    1998-11-06

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks.

  12. Case study B. Architectural design management using a project web

    NARCIS (Netherlands)

    DeClerck, F.; Pels, H.J.; Otter, den A.F.H.J.; Emmitt, S.; Prins, M.; Otter, den A.F.

    2009-01-01

    In this chapter the use and organization of use of a project website is described in the design and realization of a construction project. The case concerns a complicated project with a high number of different parties involved, managed by an architectural office and having an internationally

  13. Leadership Behaviors In Project Design Offices

    OpenAIRE

    Kasapoğlu, Esin

    2011-01-01

    Leadership may be defined as the ability to collect a group of people around definite objectives and the achievement of said objectives. An architectural design team needs a leader, and in this paper, the owner of the office is the formal leader. Leadership behaviors of employer architects are directly related to the performance of the design team; therefore, effective leadership is key to a successful design process. Data were collected through a questionnaire on leadership behaviors that wa...

  14. Supplemental design requirements document, Project W026

    International Nuclear Information System (INIS)

    Weidert, J.R.

    1993-01-01

    This document supplements and extends the Functional Design Criteria, SP-W026-FDC-001, for the Waste Receiving and Processing Facility (WRAP), Module 1. It provides additional detailed requirements, summarizes key Westinghouse Hanford Company design guidance, and establishes baseline technical agreements to be used in definitive design of the WRAP-1 facility. Revision 3 of the Supplemental Design Requirements Document has been assigned an Impact Level of 3ESQ based on the content of the entire revision. The actual changes made from Revision 2 have an Impact Level of 3S and the basis for these changes was previously reviewed and approved per WHC correspondence No. 9355770

  15. A Staff Development Program Designed To Reach the Partnership School's Goals: Cooperative Learning Strategies, Coaching Sessions and a Narrowed Academic Performance Gap among Student Populations.

    Science.gov (United States)

    Cook, Kathy; Karr-Kidwell, PJ

    This paper describes the design and implementation of a staff-development program at Vivian Field Junior High School in Carrollton, Texas. The school is a member of the Texas Partnership School Initiative, which was created to give schools latitude in raising student achievement. The goal of the staff-development program was to identify gains in…

  16. Assessing the Impact of a Program Designed to Develop Sustainability Leadership amongst Staff Members in Higher Education Institutes: A Case Study from a Community of Practice Perspective

    Science.gov (United States)

    Alkaher, Iris; Avissar, Ilana

    2018-01-01

    This study focuses on the impact of a sustainability leadership development program (SLDP) designed to develop staff members as leaders who encourage sustainability practices within institutions of higher education (IHE). Using the framework of community of practice (CoP), we explored the program's contribution by interviewing 16 staff members who…

  17. An Architecture Design Project: "Building" Understanding

    Science.gov (United States)

    Bush, Sarah B.; Albanese, Judith; Karp, Karen S.; Karp, Matthew

    2017-01-01

    Middle school students need relevant, meaningful contexts to apply emerging mathematical ideas. In this project, through the context of an architecture investigation, seventh-grade students engaged in mathematics involving area, surface area, volume, ratios and proportional thinking, number sense, and technology integration. Students, working in…

  18. Integrated project delivery : The designer as integrator

    NARCIS (Netherlands)

    Wamelink, J.W.F.; Koolwijk, J.S.J.; van Doorn, A.J.

    2012-01-01

    Process innovation related to integrated project delivery is an important topic in the building industry. Studies on process innovation through the use of integrated contracts usually focus on contractors, and particularly on the possibility of forward integration into the building process. Three

  19. Building a Creative Ecosystem: The Young Designers on Location Project

    Science.gov (United States)

    Davies, Dan; Howe, Alan; Haywood, Susan

    2004-01-01

    This article reports on findings from a research project designed to explore ways in which creativity can be fostered through interactions between selected children, particular environments, materials, techniques and key adults. The Young Designers on Location (YDoL) project was funded by the National Endowment for Science, Technology and the Arts…

  20. Group Projects in Interior Design Studio Classes: Peer Feedback Benefits

    Science.gov (United States)

    Jurado, Juan A.

    2011-01-01

    Group projects have been shown to be effective for providing peer feedback in classrooms. While students in regular enrollment classes benefit from peer feedback, low-enrollment classes face many challenges. This study compares peer feedback effectiveness between two interior design studio classes with different design projects. In one class,…

  1. Knowledge management in design teams using a project website

    OpenAIRE

    Otter, den, A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for sharing of knowledge in such teams are hard to change and better systems are difficult to implement for various reasons. Sharing of knowledge in such teams is important for collective understanding of ...

  2. Strategy-Based Development of Teacher Educators' ICT Competence through a Co-operative Staff Development Project

    Science.gov (United States)

    Lavonen, Jari; Lattu, Matti; Juuti, Kalle; Meisalo, Veijo

    2006-01-01

    An ICT strategy and an implementation plan for teacher education were created in a co-operative process. Visions and expectations of staff members and students were registered by questionnaires and by making notes during sessions in which the strategy was created. Thereafter, an implementation document, where the staff development programme and…

  3. Projecting regulatory expectations for advanced reactor designs

    International Nuclear Information System (INIS)

    Viktorov, A.

    2011-01-01

    This paper explores the overarching safety principles that will likely guide the safety design of advanced reactor technologies. As will be shown, the already established safety framework provides a solid foundation for the safety design of future nuclear power plants. As a specific example, the principle of 'proven technology' is presented in greater detail and its implications for a novel technology are discussed. Research, modeling and prototyping are shown to be components in satisfying this principle. While the fundamental safety principles are in place, their interpretation may depend both on the considered technology as well as the national context. Thus, the regulatory authority will need to be engaged, at an appropriate stage of the technology development, in specifying the regulatory requirements that will have to be met for a specific reactor design. (author)

  4. Staff Development and Instructional Improvement: Response to Robbins and Wolfe.

    Science.gov (United States)

    Anderson, Lorin W.

    1987-01-01

    Critiques the Napa/Vacaville project for being exceptionally well designed yet being ineffective. The key to effective staff development is to find ways of increasing teachers' ability to accept innovations and incorporate them into their teaching repertoires. (MD)

  5. Accumulator ring design for the NSNS project

    International Nuclear Information System (INIS)

    Weng, W.T.; Alessi, J.; Beebe-Wang, J.

    1997-01-01

    The goal of the proposed National Spallation Neutron Source (NSNS) is to provide a short pulse proton beam of about 0.5 μs with average beam power of 1 MW. To achieve such purpose, a proton storage ring operated at 60 Hz with 1 x 10 14 protons per pulse at 1 GeV is required. The Accumulator Ring (AR) receives 1 msec long H - beam bunches of 28 mA from a 1 GeV linac. Scope and design performance goals of the AR are presented, other possible technological choices and design options considered, but not adopted, are also briefly reviewed

  6. CAD Skills Increased through Multicultural Design Project

    Science.gov (United States)

    Clemons, Stephanie

    2006-01-01

    This article discusses how students in a college-entry-level CAD course researched four generations of their family histories and documented cultural and symbolic influences within their family backgrounds. AutoCAD software was then used to manipulate those cultural and symbolic images to create the design for a multicultural area rug. AutoCAD was…

  7. CEBAF design overview and project status

    International Nuclear Information System (INIS)

    Leemann, C.

    1988-01-01

    The Continuous Beam Accelerator Facility (CEBAF) will be an electron accelerator for nuclear physics research providing continuous beams with energies up to at least 4 GeV. The CEBAF is a recirculating linac. The design rationale, performance objectives, concept and fundamental choices for the CEBAF are discussed. 19 references, 10 figures, 1 table

  8. Duplex Design Project: Science Pilot Test.

    Science.gov (United States)

    Center for Research on Evaluation, Standards, and Student Testing, Los Angeles, CA.

    Work is reported towards the completion of a prototype duplex-design assessment instrument for grade-12 science. The student course-background questionnaire and the pretest section of the two-stage instrument that was developed were administered to all 134 12th-grade students at St. Clairsville High School (Ohio). Based on the information obtained…

  9. Yucca Mountain Project Subsurface Facilities Design

    International Nuclear Information System (INIS)

    Linden, A.; Saunders, R.S.; Boutin, R.J.; Harrington, P.G.; Lachman, K.D.; Trautner, L.J.

    2002-01-01

    Four units of the Topopah Springs formation (volcanic tuff) are considered for the proposed repository: the upper lithophysal, the middle non-lithophysal, the lower lithophysal, and the lower non-lithophysal. Yucca Mountain was recently designated the site for a proposed repository to dispose of spent nuclear fuel and high-level radioactive waste. Work is proceeding to advance the design of subsurface facilities to accommodate emplacing waste packages in the proposed repository. This paper summarized recent progress in the design of subsurface layout of the proposed repository. The original Site Recommendation (SR) concept for the subsurface design located the repository largely within the lower lithophysal zone (approximately 73%) of the Topopah The Site Recommendation characterized area suitable for emplacement consisted of the primary upper block, the lower block and the southern upper block extension. The primary upper block accommodated the mandated 70,000 metric tons of heavy metal (MTHM) at a 1.45 kW/m hear heat load. Based on further study of the Site Recommendation concept, the proposed repository siting area footprint was modified to make maximum use of available site characterization data, and thus, reduce uncertainties associated with performance assessment. As a result of this study, a modified repository footprint has been proposed and is presently being review for acceptance by the DOE. A panel design concept was developed to reduce overall costs and reduce the overall emplacement schedule. This concept provides flexibility to adjust the proposed repository subsurface layout with time, as it makes it unnecessary to ''commit'' to development of a large single panel at the earliest stages of construction. A description of the underground layout configuration and influencing factors that affect the layout configuration are discussed in the report

  10. Application of project design peer review to improve quality assurance

    International Nuclear Information System (INIS)

    McClure, F.E.

    1989-01-01

    DOE ORDER 5481.1B Safety Analysis and Review Systems and DOE ORDER 6430.1A General Design Criteria require that the design of facilities shall incorporate the necessary Quality Assurance review requirements to assure that the established program quality assurance objectives are met in the design criteria and the construction documents. The use of Project Design Peer Review to satisfy these requirements is presented. The University of California manages the Lawrence Berkeley Laboratory, the Lawrence Livermore National Laboratory, and the Los Alamos National Scientific Laboratory. The 1988 University Seismic Safety Policy requires the use of independent Project Design Peer Review in its capital improvement and seismic reconstruction program

  11. The Healy Clean Coal Project: Design verification tests

    International Nuclear Information System (INIS)

    Guidetti, R.H.; Sheppard, D.B.; Ubhayakar, S.K.; Weede, J.J.; McCrohan, D.V.; Rosendahl, S.M.

    1993-01-01

    As part of the Healy Clean Coal Project, TRW Inc., the supplier of the advanced slagging coal combustors, has successfully completed design verification tests on the major components of the combustion system at its Southern California test facility. These tests, which included the firing of a full-scale precombustor with a new non-storage direct coal feed system, supported the design of the Healy combustion system and its auxiliaries performed under Phase 1 of the project. Two 350 million BTU/hr combustion systems have been designed and are now ready for fabrication and erection, as part of Phase 2 of the project. These systems, along with a back-end Spray Dryer Absorber system, designed and supplied by Joy Technologies, will be integrated with a Foster Wheeler boiler for the 50 MWe power plant at Healy, Alaska. This paper describes the design verification tests and the current status of the project

  12. A process model for design team communication within fast-track building projects using project websites

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Reymen, I.M.M.J.

    2008-01-01

    The factor time within building projects is on high pressure because of the increasing need for faster delivery of buildings. Within fast track, complex building projects the design process is an important key. Through case analyses offart-hack design processes it became obvious that process and

  13. Project-Based Learning and Design-Focused Projects to Motivate Secondary Mathematics Students

    Science.gov (United States)

    Remijan, Kelly W.

    2017-01-01

    This article illustrates how mathematics teachers can develop design-focused projects, related to project-based learning, to motivate secondary mathematics students. With first-hand experience as a secondary mathematics teacher, I provide a series of steps related to the engineering design process, which are helpful to teachers in developing…

  14. Design criteria for Reedy Creek Demonstration Project

    International Nuclear Information System (INIS)

    Felicione, F.S.; Logan, J.A.

    1980-11-01

    This document defines the basic criteria for the 100-ton/day pilot plant which will use the Andco-Torrax pyrolysis process at Walt Disney World in Orlando, Florida, to produce hot water. The waste will simulate transuranic wastes which are stored at INEL. The Andco-Torrax process is designed to convert mixed municipal refuse into energy and is called slagging pyrolysis solid waste conversion

  15. Recognizing Risk-of-Failure in Communication Design Projects

    Science.gov (United States)

    Yee, Joyce; Lievesley, Matthew; Taylor, Louise

    2009-01-01

    The pace of commercial graphic design practice presents very few opportunities to conduct user research after a project's launch. This makes the design team's ability to anticipate and address risks during the design development phase even more important, recognized in the astute observation from Tim Brown, CEO of leading international design…

  16. Introducing Project-Based Learning to Design Enterprises for Creativity

    DEFF Research Database (Denmark)

    Wang, Feng; Zhou, Chunfang; Chen, Hongbing

    2013-01-01

    This paper aims to emphasize the necessity of introducing Project-Based Learning (PBL) to design enterprises in order to foster designers creativity and facilitate innovation of design enterprises. According to the literature review, creativity can be viewed as the first stage of innovation; PBL...

  17. NPP-Nuclear Island Design. From conceptual design to Project execution

    International Nuclear Information System (INIS)

    Lanchet, Dominique

    2014-01-01

    The second day opened with the lecture of Dominique Lanchet, Design Senior Vice President at AREVA Engineering and Project. Dominique Lanchet gave us an overview of the steps of a Nuclear Island Design creation from the conceptual design to the project execution, giving the examples of the EPR and ATMEA1 TM nuclear reactors

  18. Project margins of advanced reactor design WWER-500

    International Nuclear Information System (INIS)

    Rogov, M.F.; Birukov, G.I.; Ershov, V.G.; Volkov, B.E.

    1994-01-01

    Project criteria for design of advanced WWER-500 reactor within design conditions are compared to the requirements of the Russian regulatory guides. Normal operation limits, safe operation limits for main anticipated operational occurrences and design limits accepted for design basis accidents are considered as in preliminary safety report. It is shown that the basic design criteria in the design of WWER-500 for the anticipated operational occurrences and for design basis accidents are more severe than required in the following regulatory guides General Safety Regulations for Nuclear Power Plants and Nuclear Safety Rules for Reactors of Nuclear Power Plants. This provides certain margins from safety point of view

  19. The Impact of Part-Time Staff on Art & Design Students' Ratings of Their Programmes

    Science.gov (United States)

    Yorke, Mantz

    2014-01-01

    Art & Design receives ratings on a number of scales of the UK's National Student Survey (NSS) that are less strong than those for some other subject areas. Art & Design, along with performing arts, is characterised by a relatively high level of part-time (PT) staffing. PT staffing data are set against NSS ratings for post-92 universities…

  20. Integration of case study approach, project design and computer ...

    African Journals Online (AJOL)

    Integration of case study approach, project design and computer modeling in managerial accounting education ... Journal of Fundamental and Applied Sciences ... in the Laboratory of Management Accounting and Controlling Systems at the ...

  1. Instructional Design and Project Management: Complementary or Divergent?

    Science.gov (United States)

    van Rooij, Shahron Williams

    2011-01-01

    This paper reports the results of a study to identify the extent to which organizations that develop educational/training products are committed to project management, as measured by their project management implementation maturity, as a methodology that is separate and distinct from the processes of instructional design. A Web survey was…

  2. Fuel Cell Car Design Project for Freshman Engineering Courses

    Science.gov (United States)

    Duke, Steve R.; Davis, Virginia A.

    2014-01-01

    In the Samuel Ginn College of Engineering at Auburn University, we have integrated a semester long design project based on a toy fuel cell car into our freshman "Introduction to Chemical Engineering Class." The project provides the students a basic foundation in chemical reactions, energy, and dimensional analysis that facilitates…

  3. Developing Mobile Clinical Decision Support for Nursing Home Staff Assessment of Urinary Tract Infection using Goal-Directed Design.

    Science.gov (United States)

    Jones, Wallace; Drake, Cynthia; Mack, David; Reeder, Blaine; Trautner, Barbara; Wald, Heidi

    2017-06-20

    Unique characteristics of nursing homes (NHs) contribute to high rates of inappropriate antibiotic use for asymptomatic bacteriuria (ASB), a benign condition. A mobile clinical decision support system (CDSS) may support NH staff in differentiating urinary tract infections (UTI) from ASB and reducing antibiotic days. We used Goal-Directed Design to: 1) Characterize information needs for UTI identification and management in NHs; 2) Develop UTI Decide, a mobile CDSS prototype informed by personas and scenarios of use constructed from Aim 1 findings; 3) Evaluate the UTI Decide prototype with NH staff. Focus groups were conducted with providers and nurses in NHs in Denver, Colorado (n= 24). Qualitative descriptive analysis was applied to focus group transcripts to identify information needs and themes related to mobile clinical decision support for UTI identification and management. Personas representing typical end users were developed; typical clinical context scenarios were constructed using information needs as goals. Usability testing was performed using cognitive walk-throughs and a think-aloud protocol. Four information needs were identified including guidance regarding resident assessment; communication with providers; care planning; and urine culture interpretation. Design of a web-based application incorporating a published decision support algorithm for evidence-based UTI diagnoses proceeded with a focus on nursing information needs during resident assessment and communication with providers. Certified nursing assistant (CNA) and registered nurse (RN) personas were constructed in 4 context scenarios with associated key path scenarios. After field testing, a high fidelity prototype of UTI Decide was completed and evaluated by potential end users. Design recommendations and content recommendations were elicited. Goal-Directed Design informed the development of a mobile CDSS supporting participant-identified information needs for UTI assessment and communication

  4. Closed and Open Design Projects in the Education of Engineers

    DEFF Research Database (Denmark)

    Franksen, Ole Immanuel

    1965-01-01

    The two aspects of engineering education are the teaching of science and the teaching of design. By ``design'' is meant the procedure of selecting and combining distinct elements to create complete systems which will perform useful functions. In this paper, the author describes the application of...... of this concept of design teaching at The Technical University of Denmark, after a procedure which includes a sequence of closed and open design projects in both computational and experimental laboratories...

  5. Design of a projection display screen with vanishing color shift for rear-projection HDTV

    Science.gov (United States)

    Liu, Xiu; Zhu, Jin-lin

    1996-09-01

    Using bi-convex cylinder lens with matrix structure, the transmissive projection display screen with high contrast and wider viewing angle has been widely used in large rear projection TV and video projectors, it obtained a inhere color shift and puzzled the designer of display screen for RGB projection tube in-line adjustment. Based on the method of light beam racing, the general software of designing projection display screen has been developed and the computer model of vanishing color shift for rear projection HDTV has bee completed. This paper discussed the practical designing method to vanish the defect of color shift and mentioned the relations between the primary optical parameters of display screen and relative geometry sizes of lens' surface. The distributions of optical gain to viewing angle and the influences on engineering design are briefly analyzed.

  6. Adapt! – Agile Project Management Supported by Axiomatic Design

    Directory of Open Access Journals (Sweden)

    Weber Jakob

    2017-01-01

    Full Text Available This paper presents a novel approach for the use of Axiomatic Design Theory in combination with agile project management methods like Scrum for an effective, structured and combined product design and development process. Agile project management methods give a guideline how to manage a project, but there is only minor assistance regarding the actual product development process itself. Axiomatic Design can be used to support these methods in this point. In concrete terms, the results of the decomposition process of this theory can be used to formulate and structure the work packages for the agile project managing process. The Independence Axiom of Axiomatic Design Theory has a substantial contribution by ensuring the independence of the work packages which can be assigned to different project team members and can be processed independently by them. The combination of the different methods not only helps to ensure a good design solution but also helps to work more agile within a project team. The here proposed approach is one part of a holistic product design and development process for changeable production units – called Adapt! – and is described within a use case in the automotive sector.

  7. Design considerations for the Yucca Mountain project exploratory shaft facility

    International Nuclear Information System (INIS)

    Bullock, R.L. Sr.

    1990-01-01

    This paper reports on the regulatory/requirements challenges of this project which exist because this is the first facility of its kind to ever be planned, characterized, designed, and built under the purview of a U.S. Nuclear Regulatory Agency. The regulations and requirements that flow down to the Architect/Engineer (A/E) for development of the Exploratory Shaft Facility (ESF) design are voluminous and unique to this project. The subsurface design and construction of the ESF underground facility may eventually become a part of the future repository facility and, if so, will require licensing by the Nuclear Regulatory Commission (NRC). The Fenix and Scisson of Nevada-Yucca Mountain Project (FSN-YMP) group believes that all of the UMP design and construction related activities, with good design/construct control, can be performed to meet all engineering requirements, while following a strict quality assurance program that will also meet regulatory requirements

  8. Design for Sustainability and Project Management Literature – A Review

    DEFF Research Database (Denmark)

    Ali, Faheem; Boks, Casper; Bey, Niki

    2016-01-01

    management literature has hardly been considered in design for sustainability research, this article attempts to review the points of intersection between these two fields, and explores the potential that knowledge from project management literature has in improving efficiency and effectiveness...... of development and implementation of design for sustainability tools.......The growing pressure on natural resources and increasing global trade have made sustainability issues a prime area of concern for all businesses alike. The increased focus on sustainability has impacted the way projects are conceived, planned, executed and evaluated in industries. Since project...

  9. Spacecraft design project: Low Earth orbit communications satellite

    Science.gov (United States)

    Moroney, Dave; Lashbrook, Dave; Mckibben, Barry; Gardener, Nigel; Rivers, Thane; Nottingham, Greg; Golden, Bill; Barfield, Bill; Bruening, Joe; Wood, Dave

    1991-01-01

    This is the final product of the spacecraft design project completed to fulfill the academic requirements of the Spacecraft Design and Integration 2 course (AE-4871) taught at the U.S. Naval Postgraduate School. The Spacecraft Design and Integration 2 course is intended to provide students detailed design experience in selection and design of both satellite system and subsystem components, and their location and integration into a final spacecraft configuration. The design team pursued a design to support a Low Earth Orbiting (LEO) communications system (GLOBALSTAR) currently under development by the Loral Cellular Systems Corporation. Each of the 14 team members was assigned both primary and secondary duties in program management or system design. Hardware selection, spacecraft component design, analysis, and integration were accomplished within the constraints imposed by the 11 week academic schedule and the available design facilities.

  10. Project Selection in the Design Studio: Absence of Learning Environments

    Science.gov (United States)

    Basa, Inci

    2010-01-01

    Project selection is an essential matter of design teaching. Based on observations of a specific curriculum, the author claims that a wide repertoire of subjects including offices, restaurants, hotels, and other public places are used to prepare design students, but that schools and other "learning environments/ schools" are similarly…

  11. The experimental design of the Missouri Ozark Forest Ecosystem Project

    Science.gov (United States)

    Steven L. Sheriff; Shuoqiong. He

    1997-01-01

    The Missouri Ozark Forest Ecosystem Project (MOFEP) is an experiment that examines the effects of three forest management practices on the forest community. MOFEP is designed as a randomized complete block design using nine sites divided into three blocks. Treatments of uneven-aged, even-aged, and no-harvest management were randomly assigned to sites within each block...

  12. Implementing Project Based Learning Approach to Graphic Design Course

    Science.gov (United States)

    Riyanti, Menul Teguh; Erwin, Tuti Nuriah; Suriani, S. H.

    2017-01-01

    The purpose of this study was to develop a learning model based Commercial Graphic Design Drafting project-based learning approach, was chosen as a strategy in the learning product development research. University students as the target audience of this model are the students of the fifth semester Visual Communications Design Studies Program…

  13. Information management needs for Fort Calhoun's design basis reconstitution project

    International Nuclear Information System (INIS)

    Beach, D.R.; Erickson, E.A.; Gambhir, S.K.; Parsons, R.D.

    1989-01-01

    While the need for information management is not new to the nuclear industry or Omaha Public Power District (OPPD), the interrelationship among design information, multiple systems, and design basis issues has necessitated the management of this information in new ways. The project team involved in the reconstitution of the design basis for OPPD's Fort Calhoun nuclear station has experienced the need for the developed effective methods for managing the vast amount of interrelated information associated with this effort. This management of information has been necessary to ensure that design basis documents (DBDs) adequately reflect the interrelated nature of component, system, and plant design; are complete and accurate; and are produced and maintained in a cost-effective manner. Fort Calhoun's aggressive design basis reconstitution project began in early 1987. The present scope of the project includes the production of 52 system and plant level DBDs; currently the project is ∼50% complete with DBDs in various stages of completion, from pilot DBDs through DBDs with approved formats, which have been issued for use. The experience in producing these documents has lead to a growing understanding of the special need for information management in each stage of the project. The development of the information tracking and management processes for the various stages of DBD development has proven to be cost-effective and gives a level of assurance that information has been included in the DBDs consistently and accurately

  14. Project time boxing and milestones as drivers for open design projects

    DEFF Research Database (Denmark)

    Tollestrup, Christian H. T.

    2015-01-01

    is very positive and that the structure, strict enforcement and rolling project management responsibility in a group work setting really helps them drive the project forward with high motivation. The main challenge lies in the balance between loading the teams with too many challenges and just providing......The Curriculums and programs in Problem Based Learning (PBL) utilizes the project-format in a team based setting for rehearsing the competencies of applying the design-oriented skills and knowledge learned in courses and workshops. If the project period is self-organised, there is a tendency......, because of the facilitated format where ‘disturbances’ are eliminated. If successful the state of creative flow is achieved. So how can we create a sense of urgency in longer project periods, not just workshop format, that would help a team of design students to engage and drive the project from the start...

  15. Project Assessment Framework through Design (PAFTD) - A Project Assessment Framework in Support of Strategic Decision Making

    Science.gov (United States)

    Depenbrock, Brett T.; Balint, Tibor S.; Sheehy, Jeffrey A.

    2014-01-01

    Research and development organizations that push the innovation edge of technology frequently encounter challenges when attempting to identify an investment strategy and to accurately forecast the cost and schedule performance of selected projects. Fast moving and complex environments require managers to quickly analyze and diagnose the value of returns on investment versus allocated resources. Our Project Assessment Framework through Design (PAFTD) tool facilitates decision making for NASA senior leadership to enable more strategic and consistent technology development investment analysis, beginning at implementation and continuing through the project life cycle. The framework takes an integrated approach by leveraging design principles of useability, feasibility, and viability and aligns them with methods employed by NASA's Independent Program Assessment Office for project performance assessment. The need exists to periodically revisit the justification and prioritization of technology development investments as changes occur over project life cycles. The framework informs management rapidly and comprehensively about diagnosed internal and external root causes of project performance.

  16. Computer-integrated design and information management for nuclear projects

    International Nuclear Information System (INIS)

    Gonzalez, A.; Martin-Guirado, L.; Nebrera, F.

    1987-01-01

    Over the past seven years, Empresarios Agrupados has been developing a comprehensive, computer-integrated system to perform the majority of the engineering, design, procurement and construction management activities in nuclear, fossil-fired as well as hydro power plant projects. This system, which is already in a production environment, comprises a large number of computer programs and data bases designed using a modular approach. Each software module, dedicated to meeting the needs of a particular design group or project discipline, facilitates the performance of functional tasks characteristic of the power plant engineering process

  17. Vitrification process equipment design for the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Chapman, C.C.; Drosjack, W.P.

    1988-10-01

    The vitrification process and equipment design is nearing completion for the West Valley Project. This report provides the basis and current status for the design of the major vessels and equipment within the West Valley Vitrification Plant. A review of the function and key design features of the equipment is also provided. The major subsystems described include the feed preparation and delivery systems, the melter, the canister handling systems, and the process off-gas system. 11 refs., 33 figs., 4 tabs

  18. Designing and Implementing a Unique Website Design Project in an Undergraduate Course

    Science.gov (United States)

    Kontos, George

    2016-01-01

    The following paper describes a distinctive collaborative service-learning project done in an undergraduate class on web design. In this project, students in a web design class contacted local community non-profit organizations to create websites (collections of web pages) to benefit these organizations. The two phases of creating a website,…

  19. A projective approach to a language of landscape design

    Directory of Open Access Journals (Sweden)

    Catherine Ward Thompson

    1997-10-01

    Full Text Available Building on the work of Kelly (1955 in personal construct psychology, and Peled (1976, I990 in ecoanalysis, this paper develops projective techniques-which use concepts of personal and phenomenological space-as a means for articulating approaches to landscape design. The projective approach involves two stages. In stage one, projective techniques are used to elicit personal constructs (which may be held at a pre-conscious or sub-conscious level, allowing the holistic experience of landscape to be explored. In stage two, using a 'projection location task' derived from the way we experience and construe the regions of our own bodies, elements of these constructs can then be articulated so as to inform the way we interact and engage with the space around us. This gives insight into the meaning of spatial layouts, which can then be translated into a design language for the structural ordering of space. The author draws on original research conducted with children as well as adults, using projective techniques to draw out their desires and needs in relation to designing their landscape environment. The paper discusses the value of such methods for landscape designers and their clients, and outlines some ongoing research to test the validity of the projection location task.

  20. Using design science in educational technology research projects

    Directory of Open Access Journals (Sweden)

    Susan M. Chard

    2017-12-01

    Full Text Available Design science is a research paradigm where the development and evaluation of a technology artefact is a key contribution. Design science is used in many domains and this paper draws on those domains to formulate a generic structure for design science research suitable for educational technology research projects. The paper includes guidelines for writing proposals using the design science research methodology for educational technology research and presents a generic research report structure. The paper presents ethical issues to consider in design science research being conducted in educational settings and contributes guidelines for assessment when the research contribution involves the creation of a technology artefact.

  1. Project W-441 cold vacuum drying facility design requirements document

    International Nuclear Information System (INIS)

    O'Neill, C.T.

    1997-01-01

    This document has been prepared and is being released for Project W-441 to record the design basis for the design of the Cold Vacuum Drying Facility. This document sets forth the physical design criteria, Codes and Standards, and functional requirements that were used in the design of the Cold Vacuum Drying Facility. This document contains section 3, 4, 6, and 9 of the Cold Vacuum Drying Facility Design Requirements Document. The remaining sections will be issued at a later date. The purpose of the Facility is to dry, weld, and inspect the Multi-Canister Overpacks before transport to dry storage

  2. Design iteration in construction projects – Review and directions

    Directory of Open Access Journals (Sweden)

    Purva Mujumdar

    2018-03-01

    Full Text Available Design phase of any construction project involves several designers who exchange information with each other most often in an unstructured manner throughout the design phase. When these information exchanges happen to occur in cycles/loops, it is termed as design iteration. Iteration is an inherent and unavoidable aspect of any design phase which requires proper planning. Till date, very few researchers have explored the design iteration (“complexity” in construction sector. Hence, the objective of this paper was to document and review the complexities of iteration during design phase of construction projects for efficient design planning. To achieve this objective, exhaustive literature review on design iteration was done for four sectors – construction, manufacturing, aerospace, and software development. In addition, semi-structured interviews and discussions were done with a few design experts to verify the different dimensions of iteration. Finally, a design iteration framework was presented in this study that facilitates successful planning. Keywords: Design iteration, Types of iteration, Causes and impact of iteration, Models of iteration, Execution strategies of iteration

  3. Cultivating Leadership Development for Support Staff.

    Science.gov (United States)

    Russell, Sharon

    1997-01-01

    Describes an urban school district's focus on leadership development for support staff. The project identified and trained 500 front-line supervisors representing office managers, food service managers, head custodians, and district maintenance supervisors. This paper explains program design, objectives, participants, management support, content,…

  4. Exploiting the Potential of CD-ROM Databases: Staff Induction at the University of East Anglia.

    Science.gov (United States)

    Guillot, Marie-Noelle; Kenning, Marie-Madeleine

    1995-01-01

    Overviews a project exploring the possibility of using CD-ROM applications and the design of exploratory didactic materials to introduce academic staff to the field of computer-assisted instruction. The project heightened the staff's awareness of electronic resources and their potential as research, teaching, and learning aids, with particular…

  5. Interactive Room Support for Complex and Distributed Design Projects

    DEFF Research Database (Denmark)

    Grønbæk, Kaj; Gundersen, Kristian Kroyer; Mogensen, Preben Holst

    2001-01-01

    We are investigating the design of digital 3D interaction technology embedded in a physical environment. We take as point of departure cemplex, collaborative industrial design projects involving heterogeneous sets of documents, and physical as well as digital 3D models. The paper introduces our...... interaction devices being experimented with in the interactive room environment. The interactive room technologies have all been designed with the requirement that they must seamlessly integrate both into the physical and into the digital work environment while providing new affordances for industrial design...

  6. The standard system for conducting the TNA (Training Needs Analysis) of Staff (delrapport fra EU Erasmus+ project SMART

    DEFF Research Database (Denmark)

    Jensen, Ulla Højmark

    2016-01-01

    The Training Needs Analysis (TNA) has been carried out with the staff of the partner organisations. A standard system for conducting a quantitative and a qualitative training needs analysis had been developed and it has been used as a framework for the analysis from the 4 partners: Limerick...... Youthreach in Ireland, Copenhagen Youth school in Denmark, Esbjerg Youth school in Denmark and Palermo, CESIE in Italy. Due to the different experience level among staff and the different national and local regulations and the school contexts; the four partners have made their individual version...... and translation of the standardised system to suit their own individual context. Limerick and Palermo have completed both a quantitative and a qualitative training needs analyses. Copenhagen and Esbjerg have completed a qualitative training needs analysis. This report summarises the findings of the four partners...

  7. Mapping and industrial IT project to a 2nd semester design-build project

    DEFF Research Database (Denmark)

    Nyborg, Mads; Høgh, Stig

    2010-01-01

    CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project in the D......CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project...... in the Diploma IT program at the Technical University of Denmark. The system in question is a weighing system operating in a LAN environment. The system is used in the medical industry for producing tablets. We present the design of a curriculum to support the development of major components of the weighing...... system. A simple teaching model for software engineering is presented which combines technical disciplines with disciplines from section 2-4 in the CDIO syllabus. The implementation of a joint project involving several courses supports the CDIO perspective. Already the traditional IT-diploma education...

  8. Final design review report for K basin dose reduction project

    International Nuclear Information System (INIS)

    Blackburn, L.D.

    1996-01-01

    The strategy for reducing radiation dose originating from radionuclides absorbed in the K East Basin concrete is to raise the pool water level to provide additional shielding. This report documents a final design review for cleaning/coating basin walls and modifying other basin components where appropriate. The conclusion of this review was that the documents developed constitute an acceptable design for the Dose Reduction Project

  9. Design considerations for a servo optical projection system

    Science.gov (United States)

    Nadalsky, Michael; Allen, Daniel; Bien, Joseph

    1987-01-01

    The present servooptical projection system (SOPS) furnishes 'out-the-window' scenery for a pilot-training flight simulator; attention is given to the parametric tradeoffs made in the SOPS' optical design, as well as to its mechanical packaging and the servonetwork performance of the unit as integrated into a research/training helicopter flight simulator. The final SOPS configuration is a function of scan head design, assembly modularity, image deterioration method, and focal lengths and relative apertures.

  10. Project Portal User-Centered Design and Engineering Report

    Science.gov (United States)

    2016-06-01

    TECHNICAL REPORT 3013 June 2016 Project Portal User-Centered Design and Engineering Report Deborah Gill-Hesselgrave Veronica Higgins Sarah...Design and Engineering Branch Under authority of Chris Raney, Head Command and Control Technology and Experiments Division iii EXECUTIVE...navy.mil  Christian Szatkowski christian.szatkowski@navy.mil  Roni Higgins roni.higgins@navy.mil  Jake Viraldo jacob.viraldo@navy.mil B

  11. Delft Aerospace Design Projects 2016 : Inspring Designs in Aeronautics, Astronautics and Wind Energy

    NARCIS (Netherlands)

    Melkert, J.A.

    2016-01-01

    This book presents an overview of the results of the Fall Design Synthesis Exercise 2015 and the Spring Design Synthesis Exercise of 2016, based on summaries of each of the projects. The Design Synthesis Exercise Coordination Committee, responsible for the organisation and execution of the exercise,

  12. Delft Aerospace Design Projects 2015 : Challenging New Designs in Aeronautics, Astronautics and Wind Energy

    NARCIS (Netherlands)

    Melkert, J.A.

    2015-01-01

    This book presents an overview of the results of the Fall Design Synthesis Exercise 2014 and the Spring Design Synthesis Exercise of 2015, based on summaries of each of the projects. The Design Synthesis Exercise Coordination Committee, responsible for the organisation and execution of the exercise,

  13. Delft Aerospace Design Projects 2014 : New Designs in Aeronautics, Astronautics and Wind Energy

    NARCIS (Netherlands)

    Melkert, J.A.

    2014-01-01

    This book presents an overview of the results of the Fall Design Synthesis Exercise 2013 and the Spring Design Synthesis Exercise of 2014, based on summaries of each of the projects. The Design Synthesis Exercise Coordination Committee, responsible for the organisation and execution of the exercise,

  14. Spent Nuclear Fuel (SNF) Project Design Verification and Validation Process

    International Nuclear Information System (INIS)

    OLGUIN, L.J.

    2000-01-01

    This document provides a description of design verification and validation activities implemented by the Spent Nuclear Fuel (SNF) Project. During the execution of early design verification, a management assessment (Bergman, 1999) and external assessments on configuration management (Augustenburg, 1999) and testing (Loscoe, 2000) were conducted and identified potential uncertainties in the verification process. This led the SNF Chief Engineer to implement corrective actions to improve process and design products. This included Design Verification Reports (DVRs) for each subproject, validation assessments for testing, and verification of the safety function of systems and components identified in the Safety Equipment List to ensure that the design outputs were compliant with the SNF Technical Requirements. Although some activities are still in progress, the results of the DVR and associated validation assessments indicate that Project requirements for design verification are being effectively implemented. These results have been documented in subproject-specific technical documents (Table 2). Identified punch-list items are being dispositioned by the Project. As these remaining items are closed, the technical reports (Table 2) will be revised and reissued to document the results of this work

  15. Research, design and development project Myoelectric Prosthesis of Upper Limb

    Energy Technology Data Exchange (ETDEWEB)

    Galiano, L; Montaner, E; Flecha, A [Bioparx, J Hernandez 1101, Parana, ERios (Argentina)

    2007-11-15

    A Research Design and Development Project was developed of a myoelectric prosthesis for a pediatric patient presenting congenital amputation of the left forearm below the elbow. A multidisciplinary work-team was formed for this goal, in order to solve the several (/various) aspects regarding this project (mechanical, ergonomics, electronics, physical). The prosthesis as an electromechanical device was divided in several blocks, trying to achieve a focused development for each stage, acording to requisites. A mechanical prototype of the prothesis was designed and built along with the circuitry needed for EMG aquisition, control logic and drivers. Having acomplished the previuos stages, the project is now dealing with the definitions of the interface between the prosthesis and the patient, with promising perspectives.

  16. Research, design and development project Myoelectric Prosthesis of Upper Limb

    International Nuclear Information System (INIS)

    Galiano, L; Montaner, E; Flecha, A

    2007-01-01

    A Research Design and Development Project was developed of a myoelectric prosthesis for a pediatric patient presenting congenital amputation of the left forearm below the elbow. A multidisciplinary work-team was formed for this goal, in order to solve the several (/various) aspects regarding this project (mechanical, ergonomics, electronics, physical). The prosthesis as an electromechanical device was divided in several blocks, trying to achieve a focused development for each stage, acording to requisites. A mechanical prototype of the prothesis was designed and built along with the circuitry needed for EMG aquisition, control logic and drivers. Having acomplished the previuos stages, the project is now dealing with the definitions of the interface between the prosthesis and the patient, with promising perspectives

  17. Designing forestry projects for climate action plan implementation

    Energy Technology Data Exchange (ETDEWEB)

    Sampson, R.N. [American Forests, Washington, DC (United States)

    1995-11-01

    Forests play an important role in sequestering and storing carbon in terrestrial ecosystems, so countries considering ways to mitigate greenhouse gas emissions are looking at forestry projects as one option. Designing forestry projects that accomplish desired goals is no simple task however, as many past failures attest. This paper proposes that, to be successful, climate change mitigation forestry projects need to: (a) feature other socially, economically and environmentally desirable goals as primary motivators; (b) be designed in cooperation with, and in the interests of, local populations, and (c), feature cooperative efforts between government, industry, and volunteer associations. Volunteer associations can often be assisted in being a more capable partner through an organizational training and support process, and this is one of the services offered to cooperating countries through American Forests. 21 refs.

  18. National synchrotron light source basic design and project status

    International Nuclear Information System (INIS)

    van Steenbergen, A.

    1981-01-01

    A summary description and the basic design parameters of the National Synchrotron Light Source, a facility for the generation of intense synchrotron radiation in the vuv and x-ray range is presented, the parameters of the sources are given, the presently planned facility beam lines are tabulated and the status of the project is indicated

  19. The ZAP Project: Designing Interactive Computer Tools for Learning Psychology

    Science.gov (United States)

    Hulshof, Casper; Eysink, Tessa; de Jong, Ton

    2006-01-01

    In the ZAP project, a set of interactive computer programs called "ZAPs" was developed. The programs were designed in such a way that first-year students experience psychological phenomena in a vivid and self-explanatory way. Students can either take the role of participant in a psychological experiment, they can experience phenomena themselves,…

  20. Systems design and engineering : facilitating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    2016-01-01

    As its name implies, the aim of Systems Design and Engineering: Facilitating Multidisciplinary Development Projects is to help systems engineers develop the skills and thought processes needed to successfully develop and implement engineered systems. Such expertise typically does not come through

  1. System Design and Engineering, lubricating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    This text book introduces systems engineering for designing systems in multidisciplinary projects. First an overview of the systems engineering process is given. Several systems thinking tracks are presented, to think about the system in a number of ways, its context, its user, its functionality,

  2. Implementation of a Project-Based Telecommunications Engineering Design Course

    Science.gov (United States)

    Aliakbarian, Hadi; Soh, Ping Jack; Farsi, Saeed; Xu, Hantao; Van Lil, Emmanuel H. E. M. J. C.; Nauwelaers, Bart K. J. C.; Vandenbosch, Guy A. E.; Schreurs, Dominique M. M.-P.

    2014-01-01

    This paper describes and discusses the implementation of a project-based graduate design course in telecommunications engineering. This course, which requires a combination of technical and soft skills for its completion, enables guided independent learning (GIL) and application of technical knowledge acquired from classroom learning. Its main…

  3. Volunteered Geographic Information System Design: Project and Participation Guidelines

    Directory of Open Access Journals (Sweden)

    José-Pablo Gómez-Barrón

    2016-07-01

    Full Text Available This article sets forth the early phases of a methodological proposal for designing and developing Volunteered Geographic Information (VGI initiatives based on a system perspective analysis in which the components depend and interact dynamically among each other. First, it focuses on those characteristics of VGI projects that present different goals and modes of organization, while using a crowdsourcing strategy to manage participants and contributions. Next, a tool is developed in order to design the central crowdsourced processing unit that is best suited for a specific project definition, associating it with a trend towards crowd-based or community-driven approaches. The design is structured around the characterization of different ways of participating, and the task cognitive demand of working on geo-information management, spatial problem solving and ideation, or knowledge acquisition. Then, the crowdsourcing process design helps to identify what kind of participants are needed and outline subsequent engagement strategies. This is based on an analysis of differences among volunteers’ participatory behaviors and the associated set of factors motivating them to contribute, whether on a crowd or community-sourced basis. From a VGI system perspective, this paper presents a set of guidelines and methodological steps in order to align project goals, processes and volunteers and thus successfully attract participation. This methodology helps establish the initial requirements for a VGI system, and, in its current state, it mainly focuses on two components of the system: project and participants.

  4. Incorporating climate change projections into riparian restoration planning and design

    Science.gov (United States)

    Perry, Laura G.; Reynolds, Lindsay V.; Beechie, Timothy J.; Collins, Mathias J.; Shafroth, Patrick B.

    2015-01-01

    Climate change and associated changes in streamflow may alter riparian habitats substantially in coming decades. Riparian restoration provides opportunities to respond proactively to projected climate change effects, increase riparian ecosystem resilience to climate change, and simultaneously address effects of both climate change and other human disturbances. However, climate change may alter which restoration methods are most effective and which restoration goals can be achieved. Incorporating climate change into riparian restoration planning and design is critical to long-term restoration of desired community composition and ecosystem services. In this review, we discuss and provide examples of how climate change might be incorporated into restoration planning at the key stages of assessing the project context, establishing restoration goals and design criteria, evaluating design alternatives, and monitoring restoration outcomes. Restoration planners have access to numerous tools to predict future climate, streamflow, and riparian ecology at restoration sites. Planners can use those predictions to assess which species or ecosystem services will be most vulnerable under future conditions, and which sites will be most suitable for restoration. To accommodate future climate and streamflow change, planners may need to adjust methods for planting, invasive species control, channel and floodplain reconstruction, and water management. Given the considerable uncertainty in future climate and streamflow projections, riparian ecological responses, and effects on restoration outcomes, planners will need to consider multiple potential future scenarios, implement a variety of restoration methods, design projects with flexibility to adjust to future conditions, and plan to respond adaptively to unexpected change.

  5. PROJECT ENGINEERING DATA MANAGEMENT AT AUTOMATED PREPARATION OF DESIGN DOCUMENTATION

    Directory of Open Access Journals (Sweden)

    A. V. Guryanov

    2017-01-01

    Full Text Available We have developed and realized instrumental means for automated support of end-to-end design process for design documentation on a product at the programming level. The proposed decision is based on processing of the engineering project data that are contained in interdependent design documents: tactical technical characteristics of products, data on the valuable metals contained in them, the list of components applied in a product and others. Processing of engineering data is based on their conversion to the form provided by requirements of industry standards for design documentation preparation. The general graph of the design documentation developed on a product is provided. The description of the developed software product is given. Automated preparation process of interdependent design documents is shown on the example of preparation of purchased products list. Results of work can be used in case of research and development activities on creation of perspective samples of ADP equipment.

  6. Designing pilot projects as boundary objects a Brazilian case study in the promotion of sustainable design

    CERN Document Server

    Zurlo, Francesco

    2016-01-01

    This book describes a collaborative Design Pilot Project held in Brazil (called MODU.Lares) involving micro and small enterprises and other actors in the furniture sector. The experience was based on an action research method and evaluated by using a tool, in order to assess the value of pilot project as a boundary object capable of fostering innovation and sustainability. The impact of the Design Pilot Project in triggering change in a fragmented local system with a poor environmental and social record, as well as management and innovation issues, were assessed with the help of the same tool, taking into account environmental, technological, economic, sociocultural, and organizational indicators. The collaborative network established was chiefly based on four elements: prototypes, meetings, exhibitions and the Pilot Project (as an overall process). The results indeed demonstrate that a Design Pilot Project can be a valid instrument for establishing a collaborative environment that promotes sustainability an...

  7. Integrating chronic care with primary care activities: enriching healthcare staff knowledge and skills and improving glycemic control of a cohort of people with diabetes through the First Line Diabetes Care Project in the Philippines

    Directory of Open Access Journals (Sweden)

    Grace Marie V. Ku

    2014-10-01

    Full Text Available Background: This study investigated the effects of integrating primary chronic care with current healthcare activities in two local government health units (LGHU of the Philippines on knowledge and skills of the LGHU staff and clinical outcomes for people with diabetes. Design: Integration was accomplished through health service reorganization, (redistribution of chronic care tasks, and training of LGHU staff. Levels of the staff's pre- and post-training diabetes knowledge and of their self-assessment of diabetes care-related skills were measured. Primary diabetes care with emphasis on self-care development was provided to a cohort of people with diabetes. Glycosylated hemoglobin (HbA1c and obesity measures were collected prior to and one year after full project implementation. Results: The training workshop improved diabetes knowledge (p<0.001 and self-assessed skills (p<0.001 of the LGHU staff. Significant reductions in HbA1c (p<0.001, waist–hip ratio (p<0.001 and waist circumference (p=0.011 of the cohort were noted. Although the reduction in HbA1c was somewhat greater among those whose community-based care providers showed improvement in knowledge and self-assessed skills, the difference was not statistically significant. Conclusions: Primary care for chronic conditions such as diabetes may be integrated with other healthcare activities in health services of low-to-middle-income countries such as the Philippines, utilizing pre-existing human resources for health, and may improve clinical endpoints.

  8. Sampling design for use by the soil decontamination project

    International Nuclear Information System (INIS)

    Rutherford, D.W.; Stevens, J.R.

    1981-01-01

    This report proposes a general approach to the problem and discusses sampling of soil to map the contaminated area and to provide samples for characterizaton of soil components and contamination. Basic concepts in sample design are reviewed with reference to environmental transuranic studies. Common designs are reviewed and evaluated for use with specific objectives that might be required by the soil decontamination project. Examples of a hierarchial design pilot study and a combined hierarchial and grid study are proposed for the Rocky Flats 903 pad area

  9. Project HealthDesign: enhancing action through information.

    Science.gov (United States)

    Brennan, Patricia Flatley; Casper, Gail; Downs, Stephen; Aulahk, Veenu

    2009-01-01

    Project HealthDesign is a country-wide initiative in the United States designed to stimulate innovation in personal health records (PHRs). Nine grantee teams engaged in an 18-month long design and prototyping process. Two teams addressed the needs of children and adolescents; three created novel approaches to help adults prevent or manage metabolic syndrome; three groups employed interface innovations to assist patients with chronic care management and one team devised a novel calendaring system to assist patients undergoing complex medical/surgical treatments to integrate care processes into their daily lives. These projects not only included development and testing of novel personal health records applications, but also served as the starting point to specify and implement a common technical core platform. The project advanced PHR development in two key ways: intensive user-centered design and a development architecture that separates applications of PHRs from the infrastructure that supports them. The initiative also allowed systematic investigation of significant ethical, legal and social issues, including how privacy considerations are changed when information technology innovations are used in the home and the rebalancing of the authority structure of health care decision making when patient-centered approaches guide the design of PHRs.

  10. A Web-Based Monitoring System for Multidisciplinary Design Projects

    Science.gov (United States)

    Rogers, James L.; Salas, Andrea O.; Weston, Robert P.

    1998-01-01

    In today's competitive environment, both industry and government agencies are under pressure to reduce the time and cost of multidisciplinary design projects. New tools have been introduced to assist in this process by facilitating the integration of and communication among diverse disciplinary codes. One such tool, a framework for multidisciplinary computational environments, is defined as a hardware and software architecture that enables integration, execution, and communication among diverse disciplinary processes. An examination of current frameworks reveals weaknesses in various areas, such as sequencing, displaying, monitoring, and controlling the design process. The objective of this research is to explore how Web technology, integrated with an existing framework, can improve these areas of weakness. This paper describes a Web-based system that optimizes and controls the execution sequence of design processes; and monitors the project status and results. The three-stage evolution of the system with increasingly complex problems demonstrates the feasibility of this approach.

  11. SLUDGE TREATMENT PROJECT KOP CONCEPTUAL DESIGN CONTROL DECISION REPORT

    International Nuclear Information System (INIS)

    Carro, C.A.

    2010-01-01

    This control decision addresses the Knock-Out Pot (KOP) Disposition KOP Processing System (KPS) conceptual design. The KPS functions to (1) retrieve KOP material from canisters, (2) remove particles less than 600 (micro)m in size and low density materials from the KOP material, (3) load the KOP material into Multi-Canister Overpack (MCO) baskets, and (4) stage the MCO baskets for subsequent loading into MCOs. Hazard and accident analyses of the KPS conceptual design have been performed to incorporate safety into the design process. The hazard analysis is documented in PRC-STP-00098, Knock-Out Pot Disposition Project Conceptual Design Hazard Analysis. The accident analysis is documented in PRC-STP-CN-N-00167, Knock-Out Pot Disposition Sub-Project Canister Over Lift Accident Analysis. Based on the results of these analyses, and analyses performed in support of MCO transportation and MCO processing and storage activities at the Cold Vacuum Drying Facility (CVDF) and Canister Storage Building (CSB), control decision meetings were held to determine the controls required to protect onsite and offsite receptors and facility workers. At the conceptual design stage, these controls are primarily defined by their safety functions. Safety significant structures, systems, and components (SSCs) that could provide the identified safety functions have been selected for the conceptual design. It is anticipated that some safety SSCs identified herein will be reclassified based on hazard and accident analyses performed in support of preliminary and detailed design.

  12. Pedagogical design for knowledge creating inquiry in customer projects

    Directory of Open Access Journals (Sweden)

    Hanni Muukkonen

    2013-09-01

    Full Text Available Two higher education courses involving students, teachers, and customers in multifaceted experiences of knowledge creation are described. The Trialogical Learning Approach (TLA provides a theoretical framework to address learning and teaching organized around authentic problems and the development of shared knowledge objects, such as reports, products, and new practices. The approach directs attention to those aspects of social interaction and artifact-mediated activities, which focus on the development of shared objects and the pursuit of novel knowledge and understanding. The roles of technology-mediation, customer involvement, and guidance in developing effective pedagogical practices for knowledge creation were addressed. It appears necessary to design sufficient open-endedness and complexity for students’ teamwork to generate unpredictable, practical, and epistemologically challenging situations. Pedagogical design for such a process has different foci in the four central phases: planning, project initiation, project execution, and presentation and evaluation. Planning and initiation are central to establishing relevance and project awareness for the collaboration of student teams with a customer. Guidance and expert modeling during project initiation and execution is needed to overcome feelings of uncertainty during a challenging and complex assignment. Mediation provided by collaboration tools facilitates reflection on collective practices, iterative development of knowledge objects, and documentation of the learning outcomes of customer projects.

  13. Engaging pediatric intensive care unit (PICU) clinical staff to lead practice improvement: the PICU participatory action research project (PICU-PAR).

    Science.gov (United States)

    Collet, Jean-Paul; Skippen, Peter W; Mosavianpour, Mir Kaber; Pitfield, Alexander; Chakraborty, Bubli; Hunte, Garth; Lindstrom, Ronald; Kissoon, Niranjan; McKellin, William H

    2014-01-08

    Despite considerable efforts, engaging staff to lead quality improvement activities in practice settings is a persistent challenge. At British Columbia Children's Hospital (BCCH), the pediatric intensive care unit (PICU) undertook a new phase of quality improvement actions based on the Community of Practice (CoP) model with Participatory Action Research (PAR). This approach aims to mobilize the PICU 'community' as a whole with a focus on practice; namely, to create a 'community of practice' to support reflection, learning, and innovation in everyday work. An iterative two-stage PAR process using mixed methods has been developed among the PICU CoP to describe the environment (stage 1) and implement specific interventions (stage 2). Stage 1 is ethnographic description of the unit's care practice. Surveys, interviews, focus groups, and direct observations describe the clinical staff's experiences and perspectives around bedside care and quality endeavors in the PICU. Contrasts and comparisons across participants, time and activities help understanding the PICU culture and experience. Stage 2 is a succession of PAR spirals, using results from phase 1 to set up specific interventions aimed at building the staff's capability to conduct QI projects while acquiring appropriate technical skills and leadership capacity (primary outcome). Team communication, information, and interaction will be enhanced through a knowledge exchange (KE) and a wireless network of iPADs. Lack of leadership at the staff level in order to improve daily practice is a recognized challenge that faces many hospitals. We believe that the PAR approach within a highly motivated CoP is a sound method to create the social dynamic and cultural context within which clinical teams can grow, reflect, innovate and feel proud to better serve patients.

  14. The design and development of Project Warrior equipment

    International Nuclear Information System (INIS)

    Thompson, V.R.; Jerram, K.

    1987-01-01

    The project Warrior standing for welding and repair robot in Oldbury reactors is the culmination of more than 7 years of conceptual thinking, research, development design and manufacture. The tile encompasses the whole project which includes a work performing manipulator, serving manipulator, the manipulators control system and consoles, a welding head and rangefinder with its associated control system and consoles and a large amount of auxiliary equipment. The system at the forefront of today's technology has been manufactured to carry out remote welding in nuclear reactors, on plate with an oxide covering of up to 200 microns

  15. Analysis of core damage frequency from internal events: Expert judgment elicitation. Part 1: Expert panel results. Part 2: Project staff results

    Energy Technology Data Exchange (ETDEWEB)

    Wheeler, T A; Cramond, W R [Sandia National Laboratories, Albuquerque, NM (United States); Hora, S C [University of Hawii at Hilo (United States); Unwin, S D [Brookhaven National Laboratory (United States)

    1989-04-01

    Quantitative modeling techniques have limitations as to the resolution of important issues in probabilistic risk assessment (PRA). Not all issues can be resolved via the existing set of methods such as fault trees, event trees, statistical analyses, data collection, and computer simulation. Therefore, an expert judgment process was developed to address issues perceived as important to risk in the NUREG-1150 analysis but which could not be resolved with existing techniques. This process was applied to several issues that could significantly affect the internal event core damage frequencies of the PRAs performed on six light water reactors. Detailed descriptions of these issues and the results of the expert judgment elicitation are reported here, as well as an explanation of the methodology used and the procedure followed in performing the overall elicitation task. The process is time-consuming and expensive. However, the results are very useful, and represent an improvement over the draft NUREG-1150 analysis in the areas of expert selection, elicitation training, issue selection and presentation, elicitation of judgment and aggregation of results. The results are presented in two parts. Part documents the expert panel elicitations, where the most important issues were presented to a panel of experts convened from throughout the nuclear power risk assessment community. Part 2 documents the process by which the project staff performed expert judgment on other important issues, using the project staff as panel members. (author)

  16. Feasibility, Design and Construction of a Small Hydroelectric Power Generation Station as a Student Design Project.

    Science.gov (United States)

    Peterson, James N.; Hess, Herbert L.

    An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…

  17. Design Fixation and Cooperative Learning in Elementary Engineering Design Project: A Case Study

    Science.gov (United States)

    Luo, Yi

    2015-01-01

    This paper presents a case study examining 3rd, 4th and 5th graders' design fixation and cooperative learning in an engineering design project. A mixed methods instrument, the Cooperative Learning Observation Protocol (CLOP), was adapted to record frequency and class observation on cooperative learning engagement through detailed field notes.…

  18. Development of a Refined Staff Group Trainer

    National Research Council Canada - National Science Library

    Quensel, Susan

    1999-01-01

    ... individual staff sections in the brigade command post. The program was designed to deliver training to newly formed, inexperienced staffs conducting the staff functions that support the military decision-making process within the execution phase...

  19. Project design of an open pit colliery in Terkidag, Turkey

    Directory of Open Access Journals (Sweden)

    H. Kose

    2010-10-01

    Full Text Available In this manuscript, first of all, the status of Turkey in terms of energy production and consumption is given and the need to relyon domestic sources, namely lignite deposits, is emphasized rather than importing fuels from abroad. Then, a thorough literature workconcerning open pit design and production planning is explained in detail. On this basis, the project design and production planningof Tekirdag-Saray open pit colliery are conducted. According to the selected production technique, machinery-equipment that willbe utilized in the coal winning system is determined and in the final part, the investment cost and unit production cost regardingthe project are computed and the importance of constructing a power plant in the region operating with domestic fuels is expressed.

  20. Integrating chemical engineering fundamentals in the capstone process design project

    DEFF Research Database (Denmark)

    von Solms, Nicolas; Woodley, John; Johnsson, Jan Erik

    2010-01-01

    Reaction Engineering. In order to incorporate reactor design into process design in a meaningful way, the teachers of the respective courses need to collaborate (Standard 9 – Enhancement of Faculty CDIO skills). The students also see that different components of the chemical engineering curriculum relate......All B.Eng. courses offered at the Technical University of Denmark (DTU) must now follow CDIO standards. The final “capstone” course in the B.Eng. education is Process Design, which for many years has been typical of chemical engineering curricula worldwide. The course at DTU typically has about 30...... of the CDIO standards – especially standard 3 – Integrated Curriculum - means that the course projects must draw on competences provided in other subjects which the students are taking in parallel with Process Design – specifically Process Control and Reaction Engineering. In each semester of the B...

  1. Kemper County IGCC (tm) Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, Matt; Rush, Randall; Madden, Diane; Pinkston, Tim; Lunsford, Landon

    2012-07-01

    The Kemper County IGCC Project is an advanced coal technology project that is being developed by Mississippi Power Company (MPC). The project is a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility incorporating the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company; Kellogg, Brown, and Root (KBR); and the United States Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Alabama. The estimated nameplate capacity of the plant will be 830 MW with a peak net output capability of 582 MW. As a result of advanced emissions control equipment, the facility will produce marketable byproducts of ammonia, sulfuric acid, and carbon dioxide. 65 percent of the carbon dioxide (CO{sub 2}) will be captured and used for enhanced oil recovery (EOR), making the Kemper County facility’s carbon emissions comparable to those of a natural-gas-fired combined cycle power plant. The commercial operation date (COD) of the Kemper County IGCC plant will be May 2014. This report describes the basic design and function of the plant as determined at the end of the Front End Engineering Design (FEED) phase of the project.

  2. High-gain capsule design for the HIDIF project

    International Nuclear Information System (INIS)

    Honrubia, J.J.; Cerrada, J.A.; Gomez, R.

    2000-01-01

    A high-gain capsule has been designed for the HIDIF project. The goal has been to relax the accelerator requirements by using a radiation pulse with lower peak temperature (220 eV) than previous designs (260 eV). The ablator material is beryllium doped with a very low concentration (0.2 atom %) of copper. The capsule absorbs 1.3 MJ and yields, approximately, 450 MJ in I-D simulations. The effect of the opacity of the ablator on capsule performance has been studied in detail. (authors)

  3. Geomatics engineering a practical guide to project design

    CERN Document Server

    Ogaja, Clement A

    2010-01-01

    OVERVIEWProject Design ProcessUnderstanding Project RequirementsInformation GatheringDesign ApproachesScheduling and Cost EstimatingWriting ProposalsBibliographyExercises CONTEMPORARY ISSUESStandards and SpecificationsDefinitionsApplication Modes of a StandardUnits of MeasureAccuracy versus PrecisionEquipment SpecificationsLimits of ClosureLeast Squares AnalysisMapping and GIS StandardsClassical Surveying StandardsGPS Surveying StandardsOther StandardsBibliography ExercisesProfessional and Ethical ResponsibilitiesKnow What You DoEthics and Professional Conduct Individual and Team Responsibilit

  4. Design basis event consequence analyses for the Yucca Mountain project

    International Nuclear Information System (INIS)

    Orvis, D.D.; Haas, M.N.; Martin, J.H.

    1997-01-01

    Design basis event (DBE) definition and analysis is an ongoing and integrated activity among the design and analysis groups of the Yucca Mountain Project (YMP). DBE's are those that potentially lead to breach of the waste package and waste form (e.g., spent fuel rods) with consequent release of radionuclides to the environment. A Preliminary Hazards Analysis (PHA) provided a systematic screening of external and internal events that were candidate DBE's that will be subjected to analyses for radiological consequences. As preparation, pilot consequence analyses for the repository subsurface and surface facilities have been performed to define the methodology, data requirements, and applicable regulatory limits

  5. Conceptual design report: Exploratory Shaft Waterline (ESWL) Project B-415

    Energy Technology Data Exchange (ETDEWEB)

    Schroeder, B.K. (Kaiser Engineers Hanford Co., Richland, WA (USA))

    1982-03-01

    This project will consist of installing a buried sanitary water transport line from the 200 West Area to the ES site. The size and type of line is to be determined by the A-E during conceptual and Title II design. The present concept is to use an 8-in. PVC line which will meet the required capacity and reliability at minimum cost. This line is not planned for use in the nuclear waste repository in basalt due to the size and source. This will be reconsidered during Title I design of the repository.

  6. Environmental education essentials for project designers in Angola

    Directory of Open Access Journals (Sweden)

    Mbongo Mpaxi

    2015-05-01

    Full Text Available The article provides a selection of essential contents supporting environmental education of project designers in Angola. To attain such objective knowledge; abilities and values to be pursued are listed. The selection was completed by means of a thorough inquire based on the application of analysis and synthesis, historical, logical, inductive, deductive and system methods. The need of Angolan builders of knowing the environmental mpact of constructions is backed up. At the same time, the professional abilities allowing the future graduates to contribute o the preservation of environment during the stages of design, construction, exploitation and demolition of buildings is described.

  7. Conceptual design report: Exploratory Shaft Waterline (ESWL) Project B-415

    International Nuclear Information System (INIS)

    Schroeder, B.K.

    1982-03-01

    This project will consist of installing a buried sanitary water transport line from the 200 West Area to the ES site. The size and type of line is to be determined by the A-E during conceptual and Title II design. The present concept is to use an 8-in. PVC line which will meet the required capacity and reliability at minimum cost. This line is not planned for use in the nuclear waste repository in basalt due to the size and source. This will be reconsidered during Title I design of the repository

  8. Design of CR superconducting dipole magnet in German FAIR project

    International Nuclear Information System (INIS)

    Zhu Yinfeng; Wu Weiyue; Wu Songtao; Xu Houchang; Liu Changle

    2008-01-01

    The engineering design of CR (collector ring) superconducting magnet of German FAIR (facility for antiproton and ion research) project is introduced. 3-D model is formed by CATIA, and the magnetic filed of 1/4 magnet is analyzed with ANSYS. Then the displacement and stress of the coil case, liquid helium (LHe) case, especially, the maximal displacement and stress when quenching happens are calculated based on the analysis of magnetic field. These results are necessary for manufacturing the formal magnet. (authors)

  9. Salt Repository Project shaft design guide: Revision 0

    International Nuclear Information System (INIS)

    1987-12-01

    The Salt Repository Project (SRP) Shaft Design Guide (SDG) and the accompanying SRP Input to Seismic Design define the basic approach for developing appropriate shaft designs for a high-level nuclear waste repository in salt at a proposed site in Deaf Smith County, Texas. The SDG is based on current mining industry standards and practices enhanced to meet the special needs of an underground nuclear waste repository. It provides a common approach for design of both the exploratory and repository shafts. The SDG defines shaft lining and material concepts and presents methods for calculating the loads and displacements that will be imposed on lining structures. It also presents the methodology and formulae for sizing lining components. The SDG directs the shaft designer to sources of geoscience and seismic design data for the Deaf Smith County, Texas repository site. In addition, the SDG describes methods for confirming shaft lining design by means of computer analysis, and it discusses performance monitoring needs that must be considered in the design. 113 refs., 18 figs., 14 tabs

  10. Design Fixation and Cooperative Learning in Elementary Engineering Design Project: A Case Study

    Directory of Open Access Journals (Sweden)

    Yi Luo

    2015-09-01

    Full Text Available This paper presents a case study examining 3rd, 4th and 5th graders’ design fixation and cooperative learning in an engineering design project. A mixed methods instrument, the Cooperative Learning Observation Protocol (CLOP, was adapted to record frequency and class observation on cooperative learning engagement through detailed field notes. Students’ design journals and reflections were also analyzed for an inductive qualitative analysis. The findings indicate three major themes of design fixation: 1 fixation on common features of things; 2 fixation on popular teenage culture; 3 fixation on the first design idea. In the cooperative learning process of elementary engineering design project, although pupils had demonstrated some abilities to solve concrete problems in a logical fashion, the participants encountered a number of obstacles in the group. Dominance, social loafing, and other problems occurring in the group process might have offset certain benefits of cooperative learning. Implications of the findings are also discussed.

  11. Design fixation and cooperative learning in elementary engineering design project: A case study

    Directory of Open Access Journals (Sweden)

    Yi Luo

    2015-09-01

    Full Text Available This paper presents a case study examining 3rd, 4th and 5th graders’ design fixation and cooperative learning in an engineering design project. A mixed methods instrument, the Cooperative Learning Observation Protocol (CLOP, was adapted to record frequency and class observation on cooperative learning engagement through detailed field notes. Students’ design journals and reflections were also analyzed for an inductive qualitative analysis. The findings indicate three major themes of design fixation: 1 fixation on common features of things; 2 fixation on popular teenage culture; 3 fixation on the first design idea. In the cooperative learning process of elementary engineering design project, although pupils had demonstrated some abilities to solve concrete problems in a logical fashion, the participants encountered a number of obstacles in the group. Dominance, social loafing, and other problems occurring in the group process might have offset certain benefits of cooperative learning. Implications of the findings are also discussed.

  12. 340 Facility Secondary Containment and Leak Detection Project W-302 Functional Design Criteria

    Energy Technology Data Exchange (ETDEWEB)

    Stordeur, R.T.

    1995-03-01

    This functional design criteria for the upgrade to the 340 radioactive liquid waste storage facility (Project W-302) specifically addresses the secondary containment issues at the current vault facility of the 340 Complex. This vault serves as the terminus for the Radioactive Liquid Waste System (RLWS). Project W-302 is necessary in order to bring this portion of the Complex into full regulatory compliance. The project title, ``340 Facility Secondary Containment and Leak Detection``, illustrates preliminary thoughts of taking corrective action directly upon the existing vault (such as removing the tanks, lining the vault, and replacing tanks). However, based on the conclusion of the engineering study, ``Engineering Study of the 300 Area Process Wastewater Handling System``, WHC-SD-WM-ER-277 (as well as numerous follow-up meetings with cognizant staff), this FDC prescribes a complete replacement of the current tank/vault system. This offers a greater array of tanks, and provides greater operating flexibility and ease of maintenance. This approach also minimizes disruption to RLWS services during ``tie-in``, as compared to the alternative of trying to renovate the old vault. The proposed site is within the current Complex area, and maintains the receipt of RLWS solutions through gravity flow.

  13. Atmospheric River Tracking Method Intercomparison Project (ARTMIP: project goals and experimental design

    Directory of Open Access Journals (Sweden)

    C. A. Shields

    2018-06-01

    Full Text Available The Atmospheric River Tracking Method Intercomparison Project (ARTMIP is an international collaborative effort to understand and quantify the uncertainties in atmospheric river (AR science based on detection algorithm alone. Currently, there are many AR identification and tracking algorithms in the literature with a wide range of techniques and conclusions. ARTMIP strives to provide the community with information on different methodologies and provide guidance on the most appropriate algorithm for a given science question or region of interest. All ARTMIP participants will implement their detection algorithms on a specified common dataset for a defined period of time. The project is divided into two phases: Tier 1 will utilize the Modern-Era Retrospective analysis for Research and Applications, version 2 (MERRA-2 reanalysis from January 1980 to June 2017 and will be used as a baseline for all subsequent comparisons. Participation in Tier 1 is required. Tier 2 will be optional and include sensitivity studies designed around specific science questions, such as reanalysis uncertainty and climate change. High-resolution reanalysis and/or model output will be used wherever possible. Proposed metrics include AR frequency, duration, intensity, and precipitation attributable to ARs. Here, we present the ARTMIP experimental design, timeline, project requirements, and a brief description of the variety of methodologies in the current literature. We also present results from our 1-month proof-of-concept trial run designed to illustrate the utility and feasibility of the ARTMIP project.

  14. Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Connell, Daniel P

    2009-01-12

    the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.

  15. Staff Association

    CERN Multimedia

    Staff Association

    2014-01-01

    Remove of the staff association office   The Staff Association offices are going to be renovated during the coming four months, February to May 2014. The physical move from our current premises 64/R-002 to our temporary office in  510/R-010 will take place on Friday January 31st, so the Secretariat will be closed on that day. Hence, from Monday February 3rd until the end of May 2014 the Staff Association Secretariat will be located in 510/R-010 (entrance just across the CERN Printshop).    

  16. Design interface management system for nuclear power plant project

    International Nuclear Information System (INIS)

    Wang Jun

    2012-01-01

    Design interfaces exist between different participants and during the whole course of a nuclear power project, and include different disciplinary requirements. The purpose of interface management is to establish a procedure, which can be efficiently used to control the complex design interfaces and ensure its compliance with NPP design requirements. To this end, a complete work procedures and relationship will be defined and classified, so as to set up the structure of interface management system. The system consists of three levels, i.e. working procedure level, management tool level and technical document level. Two management routes, i.e. administration route and technical route, are adopted so as to conduct management efficiently. (author)

  17. Enhancing co-operation between AVN, IRSN and GRS: the junior staff pilot project on the comparative testing of IPA codes

    International Nuclear Information System (INIS)

    Hoyos, A. de; Keesmann, S.; Smidts, O.

    2006-01-01

    - Objectives: The project takes place within the framework of the Junior Staff Program of AVN, GRS and IRSN which aims at creating a junior staff network among European TSOs. The objective of this project is to apply integrated performance assessment (IPA) tools used by AVN, IRSN and GRS to two generic and simplified models (Bure site in France and Mol site in Belgium) for disposal systems in argillaceous formations. The comparison of the results from different codes applied to the disposal systems of the two mentioned sites aims at a better understanding of the confinement capabilities of the considered geological formations and of the IPA methodology in general. The incentive is a common understanding of approaches developed by each partner and the improvement of this expertise. More specifically, this pilot project aims at enhancing exchanges of views and mutual experiences in the field of understanding major safety functions. - Tools and Methods: A new code for the assessment of barrier systems in argillaceous formations has only recently been developed at GRS, as in the past such formations played a minor role as a possible hosting environment for a repository in Germany. The project also serves as a test case for this code. The considered disposal systems are defined on the basis of the concepts and data available for Mol and Bure. The program packages used for the performance assessment calculations are: HYDRUS-1D with source term module (AVN), GoldSim (IRSN) and EMOS-modules CLAYPOS and CHET (GRS). While the coupling of HYDRUS-1D with a source term module and the EMOS-modules are FORTRAN77- coded programs specifically developed for the simulation of parts of a barrier system of a final repository, GoldSim is a general purpose simulation environment with an integrated graphical user interface for modelling and data output. Models realized in GoldSim are flexible and can be easily adapted to new requirements. The software also offers an intrinsic

  18. Northeast Oregon Hatchery Project, Conceptual Design Report, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Watson, Montgomery (Montgomery Watson, Bellevue, WA)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  19. Northeast Oregon Hatchery Project conceptual design report. Final report

    International Nuclear Information System (INIS)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed

  20. IRIS project update: status of the design and licensing activities

    International Nuclear Information System (INIS)

    Petrovic, B.; Carelli, M.

    2004-01-01

    This paper presents an overview of the current status of the IRIS (International Reactor Innovative and Secure) project, focusing on the design and licensing activities. An update relative to the previous presentation at the 4th HND Conference is provided, highlighting some of the main accomplishments over the past two years. After successfully completing the conceptual design phase, IRIS is now finalizing the preliminary design as well. The pre-application licensing review with the U.S. NRC has been initiated in October of 2002. The safety-by-design approach and PRA-guided design open the possibility to aim for licensing not requiring off-site emergency response planning. Multiple single-unit and twin-unit site layouts have been developed within the ESP (Early Site Permit) program currently pursued by three U.S. power utilities. Desalination and district heating options have recently been added to the base design. Staggered construction schedules of multiple units may be applied to optimize cash-flow and minimize the required investment, making IRIS a financially attractive option, even for economies with limited investment capabilities. Because of its modularity, compatibility with smaller/medium grids, and enabling gradual build of new generating capacity matching the needs, IRIS has a large potential in the worldwide market.(author)

  1. Educational Designs Supporting Student Engagement Through Network Project Studies

    DEFF Research Database (Denmark)

    Nielsen, Jørgen Lerche

    2016-01-01

    Internationally, new pedagogical approaches emphasizing collaboration or learning in networks have been developed following the introduction of new technologies, especially the spread of social media. It is interesting to see such pedagogical developments in relation to similar approaches......, developed from the traditions of organizing university studies through student-driven project work and problem-driven learning approaches, which have been developed at the Danish universities of Roskilde and Aalborg as early as from the beginning of the 1970s. Specific educational designs integrating...... digital media are discussed, especially focusing on student engagement and the implications of organizing the pedagogical practice as networked project work. The discussions are based on the author’s experiences during 16 years of teaching and supervising at the Danish Master’s Program of ICT and Learning...

  2. Results From a Channel Restoration Project: Hydraulic Design Considerations

    Science.gov (United States)

    Karle, K.F.; Densmore, R.V.; ,

    2001-01-01

    Techniques for the hydraulic restoration of placer-mined streams and floodplains were developed in Denali National Park and Preserve, Alaska. The two-year study at Glen Creek focused on a design of stream and floodplain geometry using hydraulic capacity and shear stress equations. Slope and sinuosity values were based on regional relationships. Design requirements included a channel capacity for a bankfull discharge and a floodplain capacity for a 1.5- to 100-year discharge. Several bio-engineering techniques using alder and willow, including anchored brush bars, streambank hedge layering, seedlings, and cuttings, were tested to dissipate floodwater energy and encourage sediment deposition until natural revegetation stabilized the new floodplains. Permanently monumented cross-sections installed throughout the project site were surveyed every one to three years. Nine years after the project began, a summer flood caused substantial damage to the channel form, including a change in width/depth ratio, slope, and thalweg location. Many of the alder brush bars were heavily damaged or destroyed, resulting in significant bank erosion. This paper reviews the original hydraulic design process, and describes changes to the channel and floodplain geometry over time, based on nine years of cross-section surveys.

  3. Preliminary Design Requirements Document for Project W-314

    Energy Technology Data Exchange (ETDEWEB)

    MCGREW, D.L.

    2000-04-27

    This document sets forth functional requirements, performance requirements, and design constraints for the tank farm systems elements identified in Section 3.1 of this document. These requirements shall be used to develop the Design Requirements Baseline for those system elements. System Overview--The tank farm system at Hanford Site currently consists of 149 single shell tanks and 28 double shell tanks with associated facilities and equipment, located in 18 separate groupings. Each grouping is known as a tank farm. They are located in the areas designated as 200 West and 200 East. Table 1-1 shows the number of tanks in each farm. The farms are connected together through a transfer system consisting of piping, diversion boxes, Double Contained Receiver Tanks (DCRT) and other miscellaneous facilities and elements. The tank farm system also connects to a series of processing plants which generate radioactive and hazardous wastes. The primary functions of the tank farm system are to store, transfer, concentrate, and characterize radioactive and hazardous waste generated at Hanford, until the waste can be safely retrieved, processed and dispositioned. The systems provided by Project W-314 support the store and transfer waste functions. The system elements to be upgraded by Project W-314 are identified in Section 3.1.

  4. Preliminary Design Requirements Document for Project W-314

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This document sets forth functional requirements, performance requirements, and design constraints for the tank farm systems elements identified in Section 3.1 of this document. These requirements shall be used to develop the Design Requirements Baseline for those system elements. System Overview--The tank farm system at Hanford Site currently consists of 149 single shell tanks and 28 double shell tanks with associated facilities and equipment, located in 18 separate groupings. Each grouping is known as a tank farm. They are located in the areas designated as 200 West and 200 East. Table 1-1 shows the number of tanks in each farm. The farms are connected together through a transfer system consisting of piping, diversion boxes, Double Contained Receiver Tanks (DCRT) and other miscellaneous facilities and elements. The tank farm system also connects to a series of processing plants which generate radioactive and hazardous wastes. The primary functions of the tank farm system are to store, transfer, concentrate, and characterize radioactive and hazardous waste generated at Hanford, until the waste can be safely retrieved, processed and dispositioned. The systems provided by Project W-314 support the store and transfer waste functions. The system elements to be upgraded by Project W-314 are identified in Section 3.1

  5. Managing deliberate self-harm in young people: An evaluation of a training program developed for school welfare staff using a longitudinal research design

    Directory of Open Access Journals (Sweden)

    McGorry Patrick D

    2008-09-01

    Full Text Available Abstract Background Although deliberate self-harm is prevalent among young people, many who engage in deliberate self-harm receive sub-optimal care. Although schools are a well placed setting to support young people who engage in self-harm there are no specific training packages designed to assist school welfare staff to support these young people. The current study aimed to design, deliver and evaluate a training course specifically for school staff. Methods The study employed a longitudinal design. Two hundred and thirteen people participated in the training and evaluation. A questionnaire was administered at baseline, immediately after the training and at 6-month follow-up in order to determine if the training led to improvements in confidence when working with young people who self-harm, perceived skill, knowledge of, and attitudes towards people who self harm. Results Prior to the course, the majority of participants demonstrated relatively high levels of confidence, perceived skill and knowledge of self-harm and endorsed relatively positive attitudes towards people who engage in self-harm. Despite this, significant improvements were observed in terms of increased confidence, increased perceptions of skill along with increased knowledge of deliberate self-harm. These improvements were sustained over the follow-up period. Conclusion The results demonstrated that the provision of specifically designed training can help school welfare staff to feel better equipped to support young people who are engaging in deliberate self-harm.

  6. Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2006-03-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see

  7. A Research Design for NASA-Funded Professional Development Projects

    Science.gov (United States)

    Bleicher, R. E.; Lambert, J.; Getty, S. R.

    2011-12-01

    This proposal outlines a research plan designed to measure gains in student learning resulting from their teachers participating in professional development. Project Description Misconceptions about global climate change (GCC) are prevalent in the general public (Kellstedt, Zahran, & Vedlitz, 2008; Washington & Cook, 2011). One solution is to provide high school students with a better grounding in the basic science and data that underlie GCC. The overarching goal of a NASA-funded project, Promoting Educational Leadership in Climate Change Literacy (PEL), is to increase GCC literacy in high school students. Research Design The research design is interpretative (Erickson, 2006), framed within a multi-method design, synthesizing both quantitative and qualitative data sources (Morse, 2003). Overall, the data will provide rich information about the PEL's impact on curriculum development, teacher pedagogical knowledge, and student learning. The expectancy-value theory of achievement motivation (E-V-C) (Fan, 2011; Wigfield & Eccles, 1994) provides a theoretical foundation for the research. Expectancy is the degree to which a teacher or student has reason to expect that they will be successful in school. Value indicates whether they think that performance at school will be worthwhile to them. Cost is the perceived sacrifices that must be undertaken, or factors that can inhibit, a successful performance at school. For students, data from an embedded E-V-C investigation will help articulate how E-V-C factors relate to student interest in science, continuing to study science, or embarking on STEM related careers. For teachers, the E-V-C measures will give insight into a key mediating variable on student achievement in science. The evaluation will seek to address research questions at the student and teacher levels. Table 1 presents a sample of research questions and data sources. This is a sample of a much larger set of questions that will be addressed in the project. Data

  8. Design project of fast subcritical system 'Mala Lasta'

    International Nuclear Information System (INIS)

    Milosevic, M.; Stefanovic, D.; Popovic, D.; Pesic, M.; Zavaljevski, N.; Nikolic, D.; Arsenovic, M.

    1988-10-01

    This report contains two parts. Part one covers the objective and fundamental elements for the choice of fast subcritical system 'Mala Lasta', review of the existing fast subcritical assemblies, and a description of the available domestic computer codes applied for calculating neutron reactor parameters. Comparison of results obtained by these codes for a number of existing subcritical assemblies was used for the choice of the design project described in part two of this report. It contains detailed description of the operating parameters of the chosen subcritical system based on the obtained calculated parameters

  9. The Role of School Design in Shaping Healthy Eating-Related Attitudes, Practices, and Behaviors among School Staff

    Science.gov (United States)

    Frerichs, Leah; Brittin, Jeri; Intolubbe-Chmil, Loren; Trowbridge, Matthew; Sorensen, Dina; Huang, Terry T.-K.

    2016-01-01

    Background: Schools have increasing responsibility to address healthy eating, but physical barriers influence their ability to adopt and sustain recommended strategies. We took advantage of a natural experiment to investigate the role of the physical environment in shaping healthy eating attitudes and practices among school staff members. Methods:…

  10. Police, Design, Plan and Manage: Developing a Framework for Integrating Staff Roles and Institutional Policies into a Plagiarism Prevention Strategy

    Science.gov (United States)

    Walker, Christopher; White, Melanie

    2014-01-01

    When student plagiarism occurs, academic interest and institutional policy generally assume the fault rests with the student. This paper questions this assumption. We claim that plagiarism is a shared responsibility and a complex phenomenon that requires an ongoing calibration of the relative skills and experiences of students and staff in…

  11. 34 CFR 75.519 - Dual compensation of staff.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Dual compensation of staff. 75.519 Section 75.519... by a Grantee? Project Staff § 75.519 Dual compensation of staff. A grantee may not use its grantee to pay a project staff member for time or work for which that staff member is compensated from some other...

  12. How does sustainability certification affect the design process? Mapping final design projects at an architectural office

    DEFF Research Database (Denmark)

    Landgren, Mathilde; Jensen, Lotte Bjerregaard

    2017-01-01

    process and informing the industry of them. This has led to optimised design processes such as Integrated Energy Design, in which many decisions related to energy consumption and indoor climate are made in the early design stages. The current tendency is to use an expanded notion of sustainability......, derived from the sustainability certification system itself, and to apply it even in the early design process. This perspective emphasises all phases of the life cycle of a building. The goal of the present study was to map how a Danish architectural office approached sustainability in the projects......The context of the study is the very strict regulation of energy consumption for operating buildings in Denmark. It is difficult to meet the requirements by system optimisation in the final design phase, so recent research has focused on ways of meeting the target by adapting the whole design...

  13. Canister Cleaning System Final Design Report - Project A.2.A

    International Nuclear Information System (INIS)

    FARWICK, C.C.

    2000-01-01

    Approximately 2,300 metric tons Spent Nuclear Fuel (SNF) are currently stored within two water filled pools, the 105 K East (KE) fuel storage basin and the 105 K West (KW) fuel storage basin, at the U.S. Department of Energy, Richland Operations Office (RL). The SNF Project is responsible for operation of the K Basins and for the materials within them. A subproject to the SNF Project is the Debris Removal Subproject, which is responsible for removal of empty canisters and lids from the basins. The Canister Cleaning System (CCS) is part of the Debris Removal Project. The CCS will be installed in the KW Basin and operated during the fuel removal activity. The KW Basin has approximately 3600 canisters that require removal from the basin. The CCS is being designed to ''clean'' empty fuel canisters and lids and package them for disposal to the Environmental Restoration Disposal Facility complex. The system will interface with the KW Basin and be located in the Dummy Elevator Pit

  14. Design management of general contractor under nuclear power project EPC mode

    International Nuclear Information System (INIS)

    Su Shaojian

    2013-01-01

    Design management has not yet formed a theoretical system recognized, general contractor design managers under nuclear power project EPC Mode lack the clear theory basis. This paper aims to discuss Design management from the angle of general contractor under nuclear power project EPC mode, Gives the concept of design management Clearly, by Combining the characteristics of nuclear power project, Gives the specific content and meaning of the design management of nuclear power project. (authors)

  15. Reusing open data for learning database design through project development

    Directory of Open Access Journals (Sweden)

    Jose-Norberto MAZÓN

    2015-12-01

    Full Text Available This paper describes a novel methodology based on reusing open data for applying project-based learning in a Database Design subject of a university degree. This methodology is applied to the ARA (Alto Rendimiento Académico or High Academic Performance group taught in the degree in Computer Engineering at the University of Alicante (Spain during 2012/2013, 2013/2014, and 2014/2015. Openness philosophy implies that huge amount of data is available to students in tabular format, ready for reusing. In our teaching experience, students propose an original scenario where different open data can be reused to a specific goal. Then, it is proposed to design a database in order to manage this data in the envisioned scenario. Open data in the subject helps in instilling a creative and entrepreneur attitude in students, as well as encourages autonomous and lifelong learning. Surveys made to students at the end of each year shown that reusing open data within project-based learning methodologies makes more motivated students since they are using real data.

  16. Managing geotechnical risk on US design-build transport projects

    Directory of Open Access Journals (Sweden)

    Kevin McLain

    2014-03-01

    Full Text Available Awarding design-build (DB contracts before a complete subsurface investigation is completed, makes mitigating the risk of differing site conditions difficult, if not impossible. The purpose of the study was to identify effective practices for managing geotechnical risk in DB projects, and it reports the results of a survey that included responses from 42 of 50 US state departments of transportation and a content analysis of DB requests for proposals from 26 states to gauge the client’s perspective, as well as 11 structured interviews with DB contractors to obtain the perspective from the other side of the DB contract.  A suite of DB geotechnical risk manage tools is presented based on the results of the analysis. Effective practices were found in three areas: enhancing communications on geotechnical issues before final proposals are submitted; the use of project-specific differing site conditions clauses; and expediting geotechnical design reviews after award. The major finding is that contract verbiage alone is not sufficient to transfer the risk of changed site conditions. The agency must actively communicate all the geotechnical information on hand at the time of the DB procurement and develop a contract strategy that reduces/retires the risk of geotechnical uncertainty as expeditiously as possible after award.

  17. DOUBLE-WALL COLLIMATOR DESIGN OF THE SNS PROJECT

    International Nuclear Information System (INIS)

    SIMOS, N.; LUDEWIG, H.; CATALAN-LASHERAS, N.; CRIVELLO, S.

    2001-01-01

    The collimator absorber array of the Spallation Neutron Source (SNS) project is responsible for stopping the 1.0 GeV protons that are in the halo of the beam. It is estimated that 0.1% of the 2 MW beam will be intercepted by the adopted collimating scheme implemented at various sections of the beam transport and accumulation. This paper summarizes the conceptual design of the collimator absorber as well as the supporting detailed analysis that were performed and guided the design process. Key requirement in the design process is the need for the collimator beam tube to minimize beam impedance while closely following its beta function. Due to lack of available experimental data, the long-term behavior of irradiated materials in an environment where they interface with coolant flow becomes an issue. Uncertainties in the long-term behavior prompted a special double-wall design that will enable not only beam halo interception but also the efficient transfer of deposited energy both under normal and off-normal conditions to the coolant flow. The thermo-mechanical response of the double wall beam tube and of a particle bed surrounding it are discussed in detail in the paper

  18. The Genome of the Netherlands: design, and project goals

    Science.gov (United States)

    Boomsma, Dorret I; Wijmenga, Cisca; Slagboom, Eline P; Swertz, Morris A; Karssen, Lennart C; Abdellaoui, Abdel; Ye, Kai; Guryev, Victor; Vermaat, Martijn; van Dijk, Freerk; Francioli, Laurent C; Hottenga, Jouke Jan; Laros, Jeroen F J; Li, Qibin; Li, Yingrui; Cao, Hongzhi; Chen, Ruoyan; Du, Yuanping; Li, Ning; Cao, Sujie; van Setten, Jessica; Menelaou, Androniki; Pulit, Sara L; Hehir-Kwa, Jayne Y; Beekman, Marian; Elbers, Clara C; Byelas, Heorhiy; de Craen, Anton J M; Deelen, Patrick; Dijkstra, Martijn; den Dunnen, Johan T; de Knijff, Peter; Houwing-Duistermaat, Jeanine; Koval, Vyacheslav; Estrada, Karol; Hofman, Albert; Kanterakis, Alexandros; Enckevort, David van; Mai, Hailiang; Kattenberg, Mathijs; van Leeuwen, Elisabeth M; Neerincx, Pieter B T; Oostra, Ben; Rivadeneira, Fernanodo; Suchiman, Eka H D; Uitterlinden, Andre G; Willemsen, Gonneke; Wolffenbuttel, Bruce H; Wang, Jun; de Bakker, Paul I W; van Ommen, Gert-Jan; van Duijn, Cornelia M

    2014-01-01

    Within the Netherlands a national network of biobanks has been established (Biobanking and Biomolecular Research Infrastructure-Netherlands (BBMRI-NL)) as a national node of the European BBMRI. One of the aims of BBMRI-NL is to enrich biobanks with different types of molecular and phenotype data. Here, we describe the Genome of the Netherlands (GoNL), one of the projects within BBMRI-NL. GoNL is a whole-genome-sequencing project in a representative sample consisting of 250 trio-families from all provinces in the Netherlands, which aims to characterize DNA sequence variation in the Dutch population. The parent–offspring trios include adult individuals ranging in age from 19 to 87 years (mean=53 years; SD=16 years) from birth cohorts 1910–1994. Sequencing was done on blood-derived DNA from uncultured cells and accomplished coverage was 14–15x. The family-based design represents a unique resource to assess the frequency of regional variants, accurately reconstruct haplotypes by family-based phasing, characterize short indels and complex structural variants, and establish the rate of de novo mutational events. GoNL will also serve as a reference panel for imputation in the available genome-wide association studies in Dutch and other cohorts to refine association signals and uncover population-specific variants. GoNL will create a catalog of human genetic variation in this sample that is uniquely characterized with respect to micro-geographic location and a wide range of phenotypes. The resource will be made available to the research and medical community to guide the interpretation of sequencing projects. The present paper summarizes the global characteristics of the project. PMID:23714750

  19. Fuel transfer system ALARA design review - Project A.15

    International Nuclear Information System (INIS)

    KUEBERTH, L.R.

    2001-01-01

    One mission of the Spent Nuclear Fuel (SNF) Project is to move the SNF from the K Basins in the Hanford 100K Area to an interim dry storage at the Canister Storage Building (CSB) in the Hanford 200 East Area. The Fuel Transfer System (FTS) is a subproject that will move the SNF from the 105K East (KE) Facility to the 105K West (KW) Facility. The SNF will be treated for shipment to the Cold Vacuum Drying (CVD) facility at the KW Basin. The SNF canisters will be loaded underwater into a Shielded Transfer Cask (STC) in the KE Basin. The fully loaded STC will be brought out of the water and placed into a Cask Transfer Overpack (CTO) by the STC Straddle Carrier. As the STC is removed from the water, it will be washed down with demineralized water by an manual rinse system. The CTO with the STC inside will be placed on a transport trailer and transferred to the KW Basin as an intra-facility transfer. The CTO will be unloaded from the shipping trailer at the KW Basin and the STC will be removed from the CTO. The STC will then be lowered into the KW Basin water and the fuel will be removed. The SNF will then be processed for shipment to the CVD. As soon as all of the fuel has been removed from the STC, the cask will be removed from the KW Basin water and placed into the CTO. The CTO will again be placed on the trailer for transport back to the KE Basin where the entire cycle will be repeated approximately 400 times. This document records the As Low As Reasonably Achievable (ALARA) findings and design recommendations/requirements by the SNF Project noted during the Final Design Review of the STC, CTO, STC Transfer System, Annexes and Roadways for support of FTS. This document is structured so that all statements that include the word ''shall'' represent design features that have been or will be implemented within the project scope. Statements that include the words ''should'' or ''recommend'' represent ALARA design features to be evaluated for future implementation

  20. Spent Nuclear Fuel (SNF) Project Design Basis Capacity Study

    International Nuclear Information System (INIS)

    CLEVELAND, K.J.

    2000-01-01

    This study of the design basis capacity of process systems was prepared by Fluor Federal Services for the Spent Nuclear Fuel Project. The evaluation uses a summary level model of major process sub-systems to determine the impact of sub-system interactions on the overall time to complete fuel removal operations. The process system model configuration and time cycle estimates developed in the original version of this report have been updated as operating scenario assumptions evolve. The initial document released in Fiscal Year (FY) 1996 varied the number of parallel systems and transport systems over a wide range, estimating a conservative design basis for completing fuel processing in a two year time period. Configurations modeling planned operations were updated in FY 1998 and FY 1999. The FY 1998 Base Case continued to indicate that fuel removal activities at the basins could be completed in slightly over 2 years. Evaluations completed in FY 1999 were based on schedule modifications that delayed the start of KE Basin fuel removal, with respect to the start of KW Basin fuel removal activities, by 12 months. This delay resulted in extending the time to complete all fuel removal activities by 12 months. However, the results indicated that the number of Cold Vacuum Drying (CVD) stations could be reduced from four to three without impacting the projected time to complete fuel removal activities. This update of the design basis capacity evaluation, performed for FY 2000, evaluates a fuel removal scenario that delays the start of KE Basin activities such that staffing peaks are minimized. The number of CVD stations included in all cases for the FY 2000 evaluation is reduced from three to two, since the scenario schedule results in minimal time periods of simultaneous fuel removal from both basins. The FY 2000 evaluation also considers removal of Shippingport fuel from T Plant storage and transfer to the Canister Storage Building for storage

  1. The iSAT Project Mechanical properties and designs

    KAUST Repository

    Llewellyn, Gareth

    2011-08-08

    The whale shark Rhincodon typus is the largest fish in the world. The global population of R.typus is unknown however the International Union for Conservation of Nature (IUNC) classified it as Vulnerable in 2005. To ensure a population of R.typus is maintained protection from direct fishing, by-catch and collision damage is required. To be able to enact successful protection the habitat and range of R.typus must be known. Many authors have conducted studies of R.typus in a variety of different locations and many more have reported sightings. In many locations R.typus consistently appear annually and many authors have hypothesised reasons for their appearance. What is not known however is whether these populations are isolated or inter-linked, and where these populations go when they are not at known sites. The aim of this thesis was to design the body of a vessel that could house the electronics and components designed to track an acoustic tag, survive in open ocean, and travel fast enough to keep up with R.typus allowing a long-term and high resolution track to be compiled. In order to design such a vessel many factors needed to be known. A large part of this thesis is a review of literature to conclude the most appropriate type of vessel, the average speed of R.typus, hence the required speed of the vessel, and the sea state of the Red Sea, hence the conditions the vessel would be required to survive in. It was concluded that the average speed of R.typus is 1.2 knots; the Red Sea reaches Sea State 5-6; and the most appropriate hull type for this project was a Small Waterplane Area Twin Hull (SWATH). After following a design iteration process, a final design was completed that it is believed will achieve all the required objectives.

  2. NKA/KRU project on operator training, control room designing and human reliability. Summary report

    International Nuclear Information System (INIS)

    1981-06-01

    A Nordic integrated project on human reliability in the conditions of new advanced technology seeks to establish: - The actual repertoire of activities and tasks performed by the operating staff of a nuclear power plant and its dependence on the present and future levels of automation. - The knowledge required for these activities and appropriate means for training plant operators and for competence evaluation and retraining in coping with the rare events. - Models of human operator performance; how do operators read information and make decisions under normal and abnormal plant conditions and how does their performance depend upon control room design. - The typical limits of human capabilities and mechanisms of human errors as they are represented in existing records of incidents and accidents in industrial plants. - The use of process computers for improved design of data presentation and operator support systems, especially for disturbance analysis and diagnosis during infrequent plant disturbance. - Development of experimental techniques to validate research results and proposals for improved man/machine interfaces and other computer-based support systems. (EG)

  3. Key Success Factors and Guidance for International Collaborative Design Projects

    Directory of Open Access Journals (Sweden)

    Robby Soetanto

    2015-11-01

    Full Text Available In the built environment (BE sector, the co-creation process of design demands understanding of requirements (as viewed by parties involved, mobilisation of tacit knowledge, negotiation, and complex exchange of information. The need to collaborate over distance has further exacerbated the complexity of the process, and, in itself, represents a significant challenge for BE professionals who are increasingly expected to undertake this process within globally distributed virtual teams. The research aims to identify key success factors and develop guidance for international collaborative design projects, via the implementation of collaborative design courses in UK and Canadian universities over three academic years. Questionnaire surveys, focus groups, observation of online meetings, personal reflections provided data for the analysis. The findings reveal the significance of the perceived risk of collaboration and a difference in preferred communication mode between architects and civil/structural engineers. These findings suggest the impact of training in the subject discipline, and that the opportunity for co-located working has helped the development of trust. The guidance is aimed at BE educators who wish to implement this activity in their courses.

  4. Port Graham Community Building Biomass Heating Design Project

    Energy Technology Data Exchange (ETDEWEB)

    Norman, Patrick [Port Graham Village Corporation, Anchorage, AK (United States); Sink, Charles [Chugachmiut, Anchorage, Alaska (United States)

    2015-04-30

    Native Village of Port Graham completed preconstruction activities to prepare for construction and operations of a cord wood biomass heating system to five or more community buildings in Port Graham, Alaska. Project Description Native Village of Port Graham (NVPG) completed preconstruction activities that pave the way towards reduced local energy costs through the construction and operations of a cord wood biomass heating system. NVPG plans include installation of a GARN WHS 3200 Boiler that uses cord wood as fuel source. Implementation of the 700,000 Btu per hour output biomass community building heat utility would heat 5-community buildings in Port Graham, Alaska. Heating system is estimated to displace 85% of the heating fuel oil or 5365 gallons of fuel on an annual basis with an estimated peak output of 600,000 Btu per hour. Estimated savings is $15,112.00 per year. The construction cost estimate made to install the new biomass boiler system is estimated $251,693.47 with an additional Boiler Building expansion cost estimated at $97,828.40. Total installed cost is estimated $349,521.87. The WHS 3200 Boiler would be placed inside a new structure at the old community Water Plant Building site that is controlled by NVPG. Design of the new biomass heat plant and hot water loop system was completed by Richmond Engineering, NVPG contractor for the project. A hot water heat loop system running off the boiler is designed to be placed underground on lands controlled by NVPG and stubbed to feed hot water to existing base board heating system in the following community buildings: 1. Anesia Anahonak Moonin Health and Dental Clinic 2. Native Village of Port Graham offices 3. Port Graham Public Safety Building/Fire Department 4. Port Graham Corporation Office Building which also houses the Port Graham Museum and Head Start Center 5. North Pacific Rim Housing Authority Workshop/Old Fire Hall Existing community buildings fuel oil heating systems are to be retro-fitted to

  5. Engaging Pediatric Intensive Care Unit (PICU) clinical staff to lead practice improvement: the PICU Participatory Action Research Project (PICU-PAR)

    Science.gov (United States)

    2014-01-01

    Background Despite considerable efforts, engaging staff to lead quality improvement activities in practice settings is a persistent challenge. At British Columbia Children’s Hospital (BCCH), the pediatric intensive care unit (PICU) undertook a new phase of quality improvement actions based on the Community of Practice (CoP) model with Participatory Action Research (PAR). This approach aims to mobilize the PICU ‘community’ as a whole with a focus on practice; namely, to create a ‘community of practice’ to support reflection, learning, and innovation in everyday work. Methodology An iterative two-stage PAR process using mixed methods has been developed among the PICU CoP to describe the environment (stage 1) and implement specific interventions (stage 2). Stage 1 is ethnographic description of the unit’s care practice. Surveys, interviews, focus groups, and direct observations describe the clinical staff’s experiences and perspectives around bedside care and quality endeavors in the PICU. Contrasts and comparisons across participants, time and activities help understanding the PICU culture and experience. Stage 2 is a succession of PAR spirals, using results from phase 1 to set up specific interventions aimed at building the staff’s capability to conduct QI projects while acquiring appropriate technical skills and leadership capacity (primary outcome). Team communication, information, and interaction will be enhanced through a knowledge exchange (KE) and a wireless network of iPADs. Relevance Lack of leadership at the staff level in order to improve daily practice is a recognized challenge that faces many hospitals. We believe that the PAR approach within a highly motivated CoP is a sound method to create the social dynamic and cultural context within which clinical teams can grow, reflect, innovate and feel proud to better serve patients. PMID:24401288

  6. Inverse axial mounting stiffness design for lithographic projection lenses.

    Science.gov (United States)

    Wen-quan, Yuan; Hong-bo, Shang; Wei, Zhang

    2014-09-01

    In order to balance axial mounting stiffness of lithographic projection lenses and the image quality under dynamic working conditions, an easy inverse axial mounting stiffness design method is developed in this article. Imaging quality deterioration at the wafer under different axial vibration levels is analyzed. The desired image quality can be determined according to practical requirements, and axial vibrational tolerance of each lens is solved with the damped least-squares method. Based on adaptive interval adjustment, a binary search algorithm, and the finite element method, the axial mounting stiffness of each lens can be traveled in a large interval, and converges to a moderate numerical solution which makes the axial vibrational amplitude of the lens converge to its axial vibrational tolerance. Model simulation is carried out to validate the effectiveness of the method.

  7. Hydraulic analysis and optimization design in Guri rehabilitation project

    Science.gov (United States)

    Cheng, H.; Zhou, L. J.; Gong, L.; Wang, Z. N.; Wen, Q.; Zhao, Y. Z.; Wang, Y. L.

    2016-11-01

    Recently Dongfang was awarded the contract for rehabilitation of 6 units in Guri power plant, the biggest hydro power project in Venezuela. The rehabilitation includes, but not limited to, the extension of output capacity by about 50% and enhancement of efficiency level. To achieve the targets the runner and the guide vanes will be replaced by the newly optimized designs. In addition, the out-of-date stay vanes with straight plate shape will be modified into proper profiles after considering the application feasibility in field. The runner and vane profiles were optimized by using state-of-the-art flow simulation techniques. And the hydraulic performances were confirmed by the following model tests. This paper describes the flow analysis during the optimization procedure and the comparison between various technical concepts.

  8. Optimized design of total energy systems: The RETE project

    Science.gov (United States)

    Alia, P.; Dallavalle, F.; Denard, C.; Sanson, F.; Veneziani, S.; Spagni, G.

    1980-05-01

    The RETE (Reggio Emilia Total Energy) project is discussed. The total energy system (TES) was developed to achieve the maximum quality matching on the thermal energy side between plant and user and perform an open scheme on the electrical energy side by connection with the Italian electrical network. The most significant qualitative considerations at the basis of the plant economic energy optimization and the selection of the operating criterion most fitting the user consumption characteristics and the external system constraints are reported. The design methodology described results in a TES that: in energy terms achieves a total efficiency evaluated on a yearly basis to be equal to about 78 percent and a fuel saving of about 28 percent and in economic terms allows a recovery of the investment required as to conventional solutions, in about seven years.

  9. The ARAMIS project: a concept robot and technical design.

    Science.gov (United States)

    Colizzi, Lucio; Lidonnici, Antonio; Pignolo, Loris

    2009-11-01

    To describe the ARAMIS (Automatic Recovery Arm Motility Integrated System) project, a concept robot applicable in the neuro-rehabilitation of the paretic upper limb after stroke. Methods, results and conclusion: The rationale and engineering of a state-of-the-art, hardware/software integrated robot system, its mechanics, ergonomics, electric/electronics features providing control, safety and suitability of use are described. An ARAMIS prototype has been built and is now available for clinical tests. It allows the therapist to design neuro-rehabilitative (synchronous or asynchronous) training protocols in which sample exercises are generated by a single exoskeleton (operated by the patient's unaffected arm or by the therapist's arm) and mirrored in real-time or offline by the exoskeleton supporting the paretic arm.

  10. The ESDRED project: Engineering studies and demonstration of repository designs

    International Nuclear Information System (INIS)

    Verstricht, J.

    2009-01-01

    The construction, operation and closure of a deep geological repository for spent fuel and long-lived radioactive waste in clay involves specific technologies. The demonstration of these techniques at an industrial scale is being carried out in the frame of a technological integrated project within the sixth Framework Programme of EURATOM. The Belgian design for high level waste disposal is based on the so-called Supercontainer concept. Within this concept, the waste is encased in a carbon steel overpack, which is consequently fitted into a 70 cm thick concrete shell, in its turn enveloped by a stainless steel liner. A Supercontainer measures about 2 m in diameter. In the design of the repository, the Supercontainers will be emplaced, one after the other, in disposal galleries. The space between the Supercontainers and the gallery lining needs to be filled up with a solid material. The most essential function of this component, referred to as backfill, is to prevent a collapse of the gallery. A secondary function is to limit the presence of free oxygen, to limit corrosion. In the ESDRED project EIG EURIDICE, together with SCK-CEN and ONDRAF/NIRAS, investigates technologies to apply the backfill. After testing two techniques to apply the backfill in 2007 at limited scale (unite with granular material and grouting with backfill mortar), grouting was selected as the preferred technique. This technique then should be tested at full-scale (30 m long mock-up). First, a full-scale structure needs to built, including an extensive instrumentation programme. In addition, the logistical needs to ensure a continuous backfill operation have to be worked out. The objective is to have the almost 100 m 3 backfilled in 4 hours

  11. Conceptual design report: Nuclear materials storage facility renovation. Part 1, Design concept. Part 2, Project management

    International Nuclear Information System (INIS)

    1995-01-01

    The Nuclear Materials Storage Facility (NMSF) at the Los Alamos National Laboratory (LANL) was a Fiscal Year (FY) 1984 line-item project completed in 1987 that has never been operated because of major design and construction deficiencies. This renovation project, which will correct those deficiencies and allow operation of the facility, is proposed as an FY 97 line item. The mission of the project is to provide centralized intermediate and long-term storage of special nuclear materials (SNM) associated with defined LANL programmatic missions and to establish a centralized SNM shipping and receiving location for Technical Area (TA)-55 at LANL. Based on current projections, existing storage space for SNM at other locations at LANL will be loaded to capacity by approximately 2002. This will adversely affect LANUs ability to meet its mission requirements in the future. The affected missions include LANL's weapons research, development, and testing (WRD ampersand T) program; special materials recovery; stockpile survelliance/evaluation; advanced fuels and heat sources development and production; and safe, secure storage of existing nuclear materials inventories. The problem is further exacerbated by LANL's inability to ship any materials offsite because of the lack of receiver sites for mate rial and regulatory issues. Correction of the current deficiencies and enhancement of the facility will provide centralized storage close to a nuclear materials processing facility. The project will enable long-term, cost-effective storage in a secure environment with reduced radiation exposure to workers, and eliminate potential exposures to the public. This document provides Part I - Design Concept which describes the selected solution, and Part II - Project Management which describes the management system organization, the elements that make up the system, and the control and reporting system

  12. Conceptual design report: Nuclear materials storage facility renovation. Part 1, Design concept. Part 2, Project management

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-14

    The Nuclear Materials Storage Facility (NMSF) at the Los Alamos National Laboratory (LANL) was a Fiscal Year (FY) 1984 line-item project completed in 1987 that has never been operated because of major design and construction deficiencies. This renovation project, which will correct those deficiencies and allow operation of the facility, is proposed as an FY 97 line item. The mission of the project is to provide centralized intermediate and long-term storage of special nuclear materials (SNM) associated with defined LANL programmatic missions and to establish a centralized SNM shipping and receiving location for Technical Area (TA)-55 at LANL. Based on current projections, existing storage space for SNM at other locations at LANL will be loaded to capacity by approximately 2002. This will adversely affect LANUs ability to meet its mission requirements in the future. The affected missions include LANL`s weapons research, development, and testing (WRD&T) program; special materials recovery; stockpile survelliance/evaluation; advanced fuels and heat sources development and production; and safe, secure storage of existing nuclear materials inventories. The problem is further exacerbated by LANL`s inability to ship any materials offsite because of the lack of receiver sites for mate rial and regulatory issues. Correction of the current deficiencies and enhancement of the facility will provide centralized storage close to a nuclear materials processing facility. The project will enable long-term, cost-effective storage in a secure environment with reduced radiation exposure to workers, and eliminate potential exposures to the public. This document provides Part I - Design Concept which describes the selected solution, and Part II - Project Management which describes the management system organization, the elements that make up the system, and the control and reporting system.

  13. Design and implementation of a project-based active/cooperative engineering design course for freshmen

    Science.gov (United States)

    Abdulaal, R. M.; Al-Bahi, A. M.; Soliman, A. Y.; Iskanderani, F. I.

    2011-08-01

    A project-based active/cooperative design course is planned, implemented, assessed and evaluated to achieve several desired engineering outcomes. The course allows freshman-level students to gain professional hands-on engineering design experience through an opportunity to practise teamwork, quality principles, communication skills, life-long learning, realistic constraints and awareness of current domestic and global challenges. Throughout successive design reports and in-class assignments, the students are required by the end of the semester to communicate, clearly and concisely, the details of their design both orally and in writing through a functional artefact/prototype, a design notebook, an A0 project poster and a final oral presentation. In addition to these direct assessment tools, several indirect measures are used to ensure triangulation. Assignments are based on customer expectations using a detailed checklist. This paper shows the direct and indirect assessment tools that indicated a high level of achievement of course learning outcomes and a high level of student satisfaction.

  14. The PEP-II Project: Low-Energy Ring Design and Project Status

    International Nuclear Information System (INIS)

    Zisman, Michael S.

    2006-01-01

    We describe the present status of the PEP-II project. The project comprises four major systems: Injector, High-Energy Ring (HER), Low-Energy Ring (LER), and Interaction Region (IR). We focus in detail on the design of the LER, as its parameters and requirements are most closely related to those required for the Beijing Tau-Charm Factory rings. The PEP-II LER is a high-current, 3.1-GeV positron ring mounted above the 9-GeV HER. The LER uses a wiggler located in one of its six straight sections to provide emittance control and additional damping. We describe the rather complicated IR, which must transport the LER beam into the plane of the HER, focus it to a common beam size, and separate the beams after the head-on collisions. Both permanent magnet and conventional electromagnets are used in this area. The LER lattice has now adopted a simplified non-interleaved sextupole correction scheme that has reduced the required number of sextupoles substantially. We describe the LER vacuum system, one of the most challenging subsystems in PEP-II. It employs several technologies. In the arcs, aluminum extrusions and titanium sublimation pumps are employed; the straight sections use stainless steel chambers with lumped ion pumps. In the wiggler area, an extended copper photon dump with nonevaporable getter (NEG) pumps is employed to handle the very large synchrotron radiation power. The design of the room-temperature RF system, the bunch-by-bunch longitudinal and transverse feedback systems, and some of the special diagnostics will be described briefly. The PEP-II project remains on schedule to begin commissioning of the HER in April 1997, followed by the LER a year later

  15. Chapter 3: Design of the Saber-Tooth Project.

    Science.gov (United States)

    Ward, Phillip

    1999-01-01

    Used data from interviews, surveys, and document analysis to describe the methods and reform processes of the Saber Tooth Project, examining selection of sites; demographics (school sites, teachers, data sources, and project assumptions); and project phases (development, planning, implementation, and support). The project's method of reform was…

  16. The effects of small-scale, homelike facilities for older people with dementia on residents, family caregivers and staff: design of a longitudinal, quasi-experimental study.

    Science.gov (United States)

    Verbeek, Hilde; van Rossum, Erik; Zwakhalen, Sandra M G; Ambergen, Ton; Kempen, Gertrudis I J M; Hamers, Jan P H

    2009-01-20

    Small-scale and homelike facilities for older people with dementia are rising in current dementia care. In these facilities, a small number of residents live together and form a household with staff. Normal, daily life and social participation are emphasized. It is expected that these facilities improve residents' quality of life. Moreover, it may have a positive influence on staff's job satisfaction and families involvement and satisfaction with care. However, effects of these small-scale and homelike facilities have hardly been investigated. Since the number of people with dementia increases, and institutional long-term care is more and more organized in small-scale and homelike facilities, more research into effects is necessary. This paper presents the design of a study investigating effects of small-scale living facilities in the Netherlands on residents, family caregivers and nursing staff. A longitudinal, quasi-experimental study is carried out, in which 2 dementia care settings are compared: small-scale living facilities and regular psychogeriatric wards in traditional nursing homes. Data is collected from residents, their family caregivers and nursing staff at baseline and after 6 and 12 months of follow-up. Approximately 2 weeks prior to baseline measurement, residents are screened on cognition and activities of daily living (ADL). Based on this screening profile, residents in psychogeriatric wards are matched to residents living in small-scale living facilities. The primary outcome measure for residents is quality of life. In addition, neuropsychiatric symptoms, depressive symptoms and social engagement are assessed. Involvement with care, perceived burden and satisfaction with care provision are primary outcome variables for family caregivers. The primary outcomes for nursing staff are job satisfaction and motivation. Furthermore, job characteristics social support, autonomy and workload are measured. A process evaluation is performed to investigate to

  17. Status of project design work for a German reprocessing plant

    International Nuclear Information System (INIS)

    Lang, K.; Zuehlke, P.

    1976-01-01

    A reprocessing plant will be built within the framework of a comprehensive waste management center planned by the Federal Government to treat the fuel elements unloaded from German nuclear power stations. On the basis of an annual throughput of 1,400 te of uranium averaged over the life of the plant, the center will be able to serve between 45,000 and 50,000 MWe of installed nuclear generating capacity. A comprehensive conceptual design study of the reprocessing plant to be built has been completed on the basis of the operating experience accumulated at the Karlsruhe reprocessing plant and the development work carried out by the Karlsruhe Nuclear Research Center and in the light also of an intensive exchange of experience with British and French reprocessing companies within the framework of United Reprocessors GmbH. This conceptual design study is the foundation for the preliminary project to be carried out on a collaborative basis by KEWA and PWK. (orig.) [de

  18. Integrating Project Management, Product Design with Industry Sponsored Projects provides Stimulating Senior Capstone Experiences

    Directory of Open Access Journals (Sweden)

    Phillip A. Sanger

    2011-07-01

    Full Text Available

    Abstract ¾ Many students are uncomfortable with real world engineering problems where needs and requirements must be concretely defined and the selection of design solutions is not black and white. This paper describes a two semester, multi-disciplinary senior capstone project for students from three Engineering and Technology Department programs (electrical engineering, electrical and computer engineering technology, and engineering technology that brings together the tools of project management and the creative product development process into industry sponsored projects.  The projects are fully integrated with the Center for Rapid Product Realization with its dual goals of economic development and enhanced learning.  The stage/gate development process is used with six formal reviews covering the development of the proposal through to the fabrication and testing of the project’s output.  Over the past four years thirty five (35 projects have been undertaken with students getting an exciting

  19. Application of project management methodology in design management of nuclear safety related structure

    International Nuclear Information System (INIS)

    Chen Mao

    2004-01-01

    This paper focuses on the application of project management methodology in the design management of Nuclear Safety Related Structure (NSRS), considering the design management features of its civil construction. Based on the experiences from the management of several projects, the project management triangle is proposed to be used in the management, to well treat the position of design interface in the project management. Some other management methods are also proposed

  20. Final Design Report for the RH LLW Disposal Facility (RDF) Project, Revision 3

    International Nuclear Information System (INIS)

    Austad, Stephanie Lee

    2015-01-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  1. Sexual health of ethnic minority MSM in Britain (MESH project: design and methods

    Directory of Open Access Journals (Sweden)

    Low Nicola

    2010-07-01

    Full Text Available Abstract Background Men who have sex with men (MSM remain the group most at risk of acquiring HIV infection in Britain. HIV prevalence appears to vary widely between MSM from different ethnic minority groups in this country for reasons that are not fully understood. The aim of the MESH project was to examine in detail the sexual health of ethnic minority MSM living in Britain. Methods/Design The main objectives of the MESH project were to explore among ethnic minority MSM living in Britain: (i sexual risk behaviour and HIV prevalence; (ii their experience of stigma and discrimination; (iii disclosure of sexuality; (iv use of, and satisfaction with sexual health services; (v the extent to which sexual health services (for treatment and prevention are aware of the needs of ethnic minority MSM. The research was conducted between 2006 and 2008 in four national samples: (i ethnic minority MSM living in Britain; (ii a comparison group of white British MSM living in Britain; (iii NHS sexual health clinic staff in 15 British towns and cities with significant ethnic minority communities and; (iv sexual health promotion/HIV prevention service providers. We also recruited men from two "key migrant" groups living in Britain: MSM born in Central or Eastern Europe and MSM born in Central or South America. Internet-based quantitative and qualitative research methods were used. Ethnic minority MSM were recruited through advertisements on websites, in community venues, via informal networks and in sexual health clinics. White and "key migrant" MSM were recruited mostly through Gaydar, one of the most popular dating sites used by gay men in Britain. MSM who agreed to take part completed a questionnaire online. Ethnic minority MSM who completed the online questionnaire were asked if they would be willing to take part in an online qualitative interview using email. Service providers were identified through the British Association of Sexual Health and HIV (BASHH and

  2. Staff Development Redesigned.

    Science.gov (United States)

    Lambert, Linda

    1988-01-01

    Contends that staff development, supposedly designed to assist teachers, has instead colluded with forces to continue their colonization. Since teachers are not taking charge of their profession and participating actively in educational change, certain actions must be taken to lighten their nonprofessional workload and to build a professional…

  3. Managing public-private megaprojects: Paradoxes, complexity and project design

    NARCIS (Netherlands)

    van Marrewijk, A.H.; Clegg, S.R.; Pitsis, T.; Veenswijk, M.B.

    2008-01-01

    Recent studies show that despite their growing popularity, megaprojects - large-scale, complex projects delivered through various partnerships between public and private organisations - often fail to meet costs estimations, time schedules and project outcomes and are motivated by vested interests

  4. FACTORS AFFECTING EFFICIENT CONSTRUCTION PROJECT DESIGN DEVELOPMENT: A PERSPECTIVE FROM INDIA

    Directory of Open Access Journals (Sweden)

    Devanshu Pandit

    2015-12-01

    Full Text Available Internationally projects exhibit time and cost overrun. It is observed that problems during design development contribute significantly to delays. In India, projects undertaken by government were largely planned and designed by departmental planners and engineers. However, after globalization, projects have increased in number resulting in design outsourcing, but with attendant challenges. The paper is aimed at identifying and analysing factors in the design development phase that can have impact on project success. 30 factors related to design development were identified through two separate brainstorming sessions. A questionnaire was then administered to determine importance ranking of these factors. Relative importance index (RII was used to prioritise these factors. Top ten factors in design development identified using RII include structural design parameters, soil investigations, design quality control, topographic survey, and architectural design parameters. The results can help firms improve their design development practices by prioritising activities that could have more impact on project performance.

  5. Spent nuclear fuel project design basis capacity study

    Energy Technology Data Exchange (ETDEWEB)

    Cleveland, K.J.

    1996-09-09

    A parametric study of the Spent Nuclear Fuel Project system capacity is presented. The study was completed using a commercially available software package to develop a summary level model of the major project systems. Alternative configurations, sub-system cycle times, and operating scenarios were tested to identify their impact on total project duration and equipment requirements.

  6. Impact of design of installations and in the personal staff formation of the hybrid equipment: PET-CT; Impacto en el diseno de instalaciones y en la formacion del personal de los equipos hibridos: PET-CT

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez, R.; Soler, K.; Alonso, I., E-mail: ramon@orasen.co.cu, E-mail: karen@orasen.co.cu, E-mail: azul@orasen.con.cu [Centro Nacional de Seguridad Nuclear, La Habana (Cuba)

    2013-11-01

    In this article the general principles to be considered in the design of a Nuclear Medicine department with PET-CT, and address the existing problems regarding training needs and staff training, to take on this new technology.

  7. A series of student design projects for improving and modernizing safety helmets

    NARCIS (Netherlands)

    Beurden, van K.M.M. (Karin); Boer, de J. (Johannes); Stilma, M. (Margot); Teeuw, W.B. (Wouter)

    2014-01-01

    The Saxion Research Centre for Design and Technology employs many students during research projects. This paper discusses a series of student design projects on safety helmets in the Safety@Work project. At construction sites workers are required to wear personal protective equipment during their

  8. Studying feasibility and effects of a two-stage nursing staff training in residential geriatric care using a 30 month mixed-methods design [ISRCTN24344776

    Directory of Open Access Journals (Sweden)

    Hantikainen Virpi

    2011-05-01

    Full Text Available Abstract Background Transfer techniques and lifting weights often cause back pain and disorders for nurses in geriatric care. The Kinaesthetics care conception claims to be an alternative, yielding benefits for nurses as well as for clients. Starting a multi-step research program on the effects of Kinaesthetics, we assess the feasibility of a two-stage nursing staff training and a pre-post research design. Using quantitative and qualitative success criteria, we address mobilisation from the bed to a chair and backwards, walking with aid and positioning in bed on the staff level as well as on the resident level. In addition, effect estimates should help to decide on and to prepare a controlled trial. Methods/Design Standard basic and advanced Kinaesthetics courses (each comprising four subsequent days and an additional counselling day during the following four months are offered to n = 36 out of 60 nurses in a residential geriatric care home, who are in charge of 76 residents. N = 22 residents needing movement support are participating to this study. On the staff level, measurements include focus group discussions, questionnaires, physical strain self-assessment (Borg scale, video recordings and external observation of patient assistance skills using a specialised instrument (SOPMAS. Questionnaires used on the resident level include safety, comfort, pain, and level of own participation during mobilisation. A functional mobility profile is assessed using a specialised test procedure (MOTPA. Measurements will take place at baseline (T0, after basic training (T1, and after the advanced course (T2. Follow-up focus groups will be offered at T1 and 10 months later (T3. Discussion Ten criteria for feasibility success are established before the trial, assigned to resources (missing data, processes (drop-out of nurses and residents and science (minimum effects criteria. This will help to make rational decision on entering the next stage of the research

  9. Design review plan for Multi-Function Waste Tank Facility (Project W-236A)

    International Nuclear Information System (INIS)

    Renfro, G.G.

    1994-01-01

    This plan describes how the Multi-Function Waste Tank Facility (MWTF) Project conducts reviews of design media; describes actions required by Project participants; and provides the methodology to ensure that the design is complete, meets the technical baseline of the Project, is operable and maintainable, and is constructable. Project W-236A is an integrated project wherein the relationship between the operating contractor and architect-engineer is somewhat different than that of a conventional project. Working together, Westinghouse Hanford Company (WHC) and ICF Karser Hanford (ICF KH) have developed a relationship whereby ICF KH performs extensive design reviews and design verification. WHC actively participates in over-the-shoulder reviews during design development, performs a final review of the completed design, and conducts a formal design review of the Safety Class I, ASME boiler and Pressure Vessel Code items in accordance with WHC-CM-6-1, Standard Engineering Practices

  10. Spent nuclear fuel project design basis capacity study

    International Nuclear Information System (INIS)

    Cleveland, K.J.

    1998-01-01

    A parametric study of the Spent Nuclear Fuel Project system capacity is presented. The study was completed using a commercially available software package to develop a summary level model of the major project systems. A base case, reflecting the Fiscal Year 1998 process configuration, is evaluated. Parametric evaluations are also considered, investigating the impact of higher fuel retrieval system productivity and reduced shift operations at the canister storage building on total project duration

  11. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  12. Design of management information system for nuclear industry architectural project costs

    International Nuclear Information System (INIS)

    Zhang Xingzhi; Li Wei

    1996-01-01

    Management Information System (MIS) for nuclear industry architectural project is analysed and designed in detail base on quota management and engineering budget management of nuclear industry in respect of the practice of Qinshan Second Phase 2 x 600 MW Project

  13. Evaluation of Embedded System Component Utilized in Delivery Integrated Design Project Course

    Science.gov (United States)

    Junid, Syed Abdul Mutalib Al; Hussaini, Yusnira; Nazmie Osman, Fairul; Razak, Abdul Hadi Abdul; Idros, Mohd Faizul Md; Karimi Halim, Abdul

    2018-03-01

    This paper reports the evaluation of the embedded system component utilized in delivering the integrated electronic engineering design project course. The evaluation is conducted based on the report project submitted as to fulfil the assessment criteria for the integrated electronic engineering design project course named; engineering system design. Six projects were assessed in this evaluation. The evaluation covers the type of controller, programming language and the number of embedded component utilization as well. From the evaluation, the C-programming based language is the best solution preferred by the students which provide them flexibility in the programming. Moreover, the Analog to Digital converter is intensively used in the projects which include sensors in their proposed design. As a conclusion, in delivering the integrated design project course, the knowledge over the embedded system solution is very important since the high density of the knowledge acquired in accomplishing the project assigned.

  14. A quantitative analysis study on the implementation of partnering in the design and build construction project

    Science.gov (United States)

    Halil, F. M.; Nasir, N. M.; Shukur, A. S.; Hashim, H.

    2018-02-01

    Design and Build construction project involved the biggest scale of the cost of investment as compared to the traditional approach. In Design and Build, the client hires a design professional that will design according to the client’s need and specification. This research aim is to explore the concept of partnering implementation practiced in the design and build procurement approach. Therefore, the selection of design professionals such as Contractors and consultants in the project is crucial to ensure the successful project completion on time, cost, and quality. The methodology adopted using quantitative approach. Administration of the questionnaire was distributed to the public client by using postal survey. Outcomes of the results, the public clients agreed that project management capabilities and commitment to budget as a crucial element of partnering from the design professional in design and build construction project.

  15. Supplemental design requirements document enhanced radioactive and mixed waste storage Phase V Project W-112

    International Nuclear Information System (INIS)

    Ocampo, V.P.; Boothe, G.F.; Greager, T.M.; Johnson, K.D.; Kooiker, S.L.; Martin, J.D.

    1994-11-01

    This document provides additional and supplemental information to WHC-SD-W112-FDC-001, Project W-112 for radioactive and mixed waste storage. It provides additional requirements for the design and summarizes Westinghouse Hanford Company key design guidance and establishes the technical baseline agreements to be used for definitive design of the Project W-112 facilities

  16. Learning Design, Social Ontology and Unintended Functionalism in Education Projects

    Science.gov (United States)

    Johnson, Mark William

    2016-01-01

    For many years there have been well-funded project opportunities for developing educational innovations, both pedagogical and technological, to fulfil the educational ambitions of national governments and European agencies. Projects have been funded on the basis of competitive bidding against themes identified by funders. Calls for funding…

  17. Design and initial implementation of the WHO FP umbrella project- to strengthen contraceptive services in the sub Saharan Africa.

    Science.gov (United States)

    Kabra, Rita; Ali, Moazzam; Kiarie, James

    2017-06-15

    Strengthening contraceptive services in sub Saharan Africa is critical to achieve the FP 2020 goal of enabling 120 million more women and girls to access and use contraceptives by 2020 and the Sustainable Development Goals (SDG) targets of universal access to sexual and reproductive health (SRH) services including family planning by 2030. The World Health Organization (WHO) and partners have designed a multifaceted project to strengthen health systems to reduce the unmet need of contraceptive and family planning services in sub Saharan Africa. The plan leverages global, regional and national partnerships to facilitate and increase the use of evidence based WHO guidelines with a specific focus on postpartum family planning. The four key approaches undertaken are i) making WHO Guidelines adaptable & appropriate for country use ii) building capacity of WHO regional/country staff iii) providing technical support to countries and iv) strengthening partnerships for introduction and implementation of WHO guidelines. This paper describes the project design and elaborates the multifaceted approaches required in initial implementation to strengthen contraceptive services. The initial results from this project reflect that simultaneous application these approaches may strengthen contraceptive services in Sub Saharan Africa and ensure sustainability of the efforts. The lessons learned may be used to scale up and expand services in other countries.

  18. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab

  19. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-09

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab.

  20. Using Agile Project Management to Enhance the Performance of Instructional Design Teams

    Science.gov (United States)

    Sweeney, David S.; Cifuentes, Lauren

    2010-01-01

    Instructional design models describe in detail methodologies for designing effective instruction. Several widely adopted models include suggestions for managing instructional design projects. However, these suggestions focus on how to manage the instructional design steps rather than the instructional design and development team process. The…

  1. Blade System Design Study. Part II, final project report (GEC).

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, Dayton A. (DNV Global Energy Concepts Inc., Seattle, WA)

    2009-05-01

    As part of the U.S. Department of Energy's Low Wind Speed Turbine program, Global Energy Concepts LLC (GEC)1 has studied alternative composite materials for wind turbine blades in the multi-megawatt size range. This work in one of the Blade System Design Studies (BSDS) funded through Sandia National Laboratories. The BSDS program was conducted in two phases. In the Part I BSDS, GEC assessed candidate innovations in composite materials, manufacturing processes, and structural configurations. GEC also made recommendations for testing composite coupons, details, assemblies, and blade substructures to be carried out in the Part II study (BSDS-II). The BSDS-II contract period began in May 2003, and testing was initiated in June 2004. The current report summarizes the results from the BSDS-II test program. Composite materials evaluated include carbon fiber in both pre-impregnated and vacuum-assisted resin transfer molding (VARTM) forms. Initial thin-coupon static testing included a wide range of parameters, including variation in manufacturer, fiber tow size, fabric architecture, and resin type. A smaller set of these materials and process types was also evaluated in thin-coupon fatigue testing, and in ply-drop and ply-transition panels. The majority of materials used epoxy resin, with vinyl ester (VE) resin also used for selected cases. Late in the project, testing of unidirectional fiberglass was added to provide an updated baseline against which to evaluate the carbon material performance. Numerous unidirectional carbon fabrics were considered for evaluation with VARTM infusion. All but one fabric style considered suffered either from poor infusibility or waviness of fibers combined with poor compaction. The exception was a triaxial carbon-fiberglass fabric produced by SAERTEX. This fabric became the primary choice for infused articles throughout the test program. The generally positive results obtained in this program for the SAERTEX material have led to its

  2. Investigation of the Relationship between Green Design and Project Delivery Methods

    Energy Technology Data Exchange (ETDEWEB)

    Bilec, Melissa M.; Ries, Robert J.

    2008-04-24

    The selection of the project delivery method (PDM) for any project is critical--it establishes communication, coordination, and contractual issues between the owner, contractor, and designer. With an increase in the number of green design projects, understanding the relationship between the PDM and green design is paramount to project and contract management. It is reasonable to assume that a positive relationship between green design and design-build (DB) exists since both theoretically are intended to foster an integrated, holistic, and collaborative project. This research examines the relationship between the design-bid-build (DBB), construction management (CM), and DB PDMs and green design with the goal of establishing best practices and identifying potential synergies between them. The research collected information by conducting primarily telephone interviews with approximately twenty-five individuals, including owners, contractors, and designers involved in completed green design projects, mainly in the public sector. The interviews developed a general understanding of the current state of knowledge and experience and not a rigorous quantitative analysis. Upon completion of the interviews, the tabulated results were summarized and green project characteristics and project-PDM interactions emerged. Existing published research was evaluated to reveal aspects of PDMs independent of green design. Best practices were ascertained by combining information from the interviews and published research. Best practices are as follows: (1) Project implementation features--The decision to use DB as PDM on green design or other projects should be based on the specific project features; e.g., well-defined scope and adequate owner staffing. DB will not produce successful results on all projects. (2) Collaboration--Project team collaboration early in the design and construction process is an important aspect of green projects, and collaboration was considered somewhat more

  3. STAFF NEEDED

    CERN Multimedia

    2001-01-01

    The English National Programme, part of the Lycée International de Ferney-Voltaire (France) needs the following staff for September 2001: A part-time teacher of primary English The post involves teaching the English curriculum to pupils who are within the French educational system: Classes take place on Tuesday afternoons at the Lycée, Team spirit necessary as teachers work as a team, Induction & training are offered. A part time teacher of senior secondary history-geography in English A part time teacher of secondary mathematics in English Teachers must be mother-tongue English speakers and have a relevant degree and/or teaching qualification. For the history-geography post, either history or geography degrees are acceptable. Please send your c.v. and a letter of application to Peter Woodburn, Head, English National Programme, Lycée International, 01216 Ferney-Voltaire, France. (Email: engnat@hotmail.com) Telephone 04 50 40 82 66 for further details of posts. Ple...

  4. Design for Thinking: Engagement in an Innovation Project

    Science.gov (United States)

    Benson, Joy; Dresdow, Sally

    2015-01-01

    This article discusses the use of design thinking in an undergraduate decision-making course. The spaces of design are linked to the dimensions of liberal learning in a way that allows students to engage in the design of an organization that supports a new product created in a collaborative team. The article provides an overview of how the…

  5. Designing a Successful Transportation Project: Lessons Learned from the Clean Cities American Recovery and Reinvestment Act Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, K.; Singer, M.

    2017-09-01

    The largest source of funding for alternative fuel vehicle and infrastructure projects in the U.S. Department of Energy's Clean Cities program's history came from the American Recovery and Reinvestment Act (Recovery Act). In 2009, the 25 cost-share projects totaled nearly $300 million in federal government investment. This effort included the involvement of 50 Clean Cities coalitions and their nearly 700 stakeholder partners who provided an additional $500 million in matching funds to support projects in their local communities. In total, those 25 projects established 1,380 alternative fueling stations and put more than 9,000 alternative fuel and advanced technology vehicles on the road. Together, these projects displaced 154 million gasoline gallon equivalents (GGE) of petroleum and averted 254,000 tons of greenhouse gas (GHG) emissions, while supporting U.S. energy independence and contributing to regional economic development. During post-project interviews, project leaders consistently cited a number of key components - ranging from technical and logistical factors, to administrative capabilities - for accomplishing an effective and impactful project. This report summarizes the high-level project design and administrative considerations for conducting a successful transportation project.

  6. Designing a Successful Transportation Project: Lessons Learned from the Clean Cities American Recovery and Reinvestment Act Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, Kay L. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Singer, Mark R. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-09-28

    The largest source of funding for alternative fuel vehicle and infrastructure projects in the U.S. Department of Energy's Clean Cities program's history came from the American Recovery and Reinvestment Act (Recovery Act). In 2009, the 25 cost-share projects totaled nearly $300 million in federal government investment. This effort included the involvement of 50 Clean Cities coalitions and their nearly 700 stakeholder partners who provided an additional $500 million in matching funds to support projects in their local communities. In total, those 25 projects established 1,380 alternative fueling stations and put more than 9,000 alternative fuel and advanced technology vehicles on the road. Together, these projects displaced 154 million gasoline gallon equivalents (GGE) of petroleum and averted 254,000 tons of greenhouse gas (GHG) emissions, while supporting U.S. energy independence and contributing to regional economic development. During post-project interviews, project leaders consistently cited a number of key components - ranging from technical and logistical factors, to administrative capabilities - for accomplishing an effective and impactful project. This report summarizes the high-level project design and administrative considerations for conducting a successful transportation project.

  7. Preliminary design review report for K Basin Dose Reduction Project

    International Nuclear Information System (INIS)

    Blackburn, L.D.

    1996-01-01

    The strategy for reducing radiation dose, originating from radionuclides absorbed in the K East Basin concrete, is to raise the pool water level to provide additional shielding. This report documents a preliminary design review conducted to ensure that design approaches for cleaning/coating basin walls and modifying other basin components were appropriate. The conclusion of this review was that design documents presently conclusion of this review was that design documents presently completed or in process of modification are and acceptable basis for proceeding to complete the design

  8. A simulation-based training program improves emergency department staff communication.

    Science.gov (United States)

    Sweeney, Lynn A; Warren, Otis; Gardner, Liz; Rojek, Adam; Lindquist, David G

    2014-01-01

    The objectives of this study were to evaluate the effectiveness of Project CLEAR!, a novel simulation-based training program designed to instill Crew Resource Management (CRM) as the communication standard and to create a service-focused environment in the emergency department (ED) by standardizing the patient encounter. A survey-based study compared physicians' and nurses' perceptions of the quality of communication before and after the training program. Surveys were developed to measure ED staff perceptions of the quality of communication between staff members and with patients. Pretraining and posttraining survey results were compared. After the training program, survey scores improved significantly on questions that asked participants to rate the overall communication between staff members and between staff and patients. A simulation-based training program focusing on CRM and standardizing the patient encounter improves communication in the ED, both between staff members and between staff members and patients.

  9. MIT/Draper Technology Development Partnership Project: Systems Analysis and On-Station Propulsion Subsystem Design

    National Research Council Canada - National Science Library

    Conklin, Theodore

    1998-01-01

    The objective of this thesis is to describe the process for, and the overall design that resulted from the MIT/Draper Project from August, 1996 to May, 1997, including the specific design of the on...

  10. Identification of Tools and Techniques to Enhance Interdisciplinary Collaboration During Design and Construction Projects.

    Science.gov (United States)

    Keys, Yolanda; Silverman, Susan R; Evans, Jennie

    2017-10-01

    The purpose of this study was to collect the perceptions of design professionals and clinicians regarding design process success strategies and elements of interprofessional engagement and communication during healthcare design and construction projects. Additional objectives were to gather best practices to maximize clinician engagement and provide tools and techniques to improve interdisciplinary collaboration for future projects. Strategies are needed to enhance the design and construction process and create interactions that benefit not only the project but the individuals working to see its completion. Meaningful interprofessional collaboration is essential to any healthcare design project and making sure the various players communicate is a critical element. This was a qualitative study conducted via an online survey. Respondents included architects, construction managers, interior designers, and healthcare personnel who had recently been involved in a building renovation or new construction project for a healthcare facility. Responses to open-ended questions were analyzed for themes, and descriptive statistics were used to provide insight into participant demographics. Information on the impressions, perceptions, and opportunities related to clinician involvement in design projects was collected from nurses, architects, interior designers, and construction managers. Qualitative analysis revealed themes of clinician input, organizational dynamics, and a variety of communication strategies to be the most frequently mentioned elements of successful interprofessional collaboration. This study validates the need to include clinician input in the design process, to consider the importance of organizational dynamics on design team functioning, and to incorporate effective communication strategies during design and construction projects.

  11. Salt Repository Project input to seismic design: Revision 0

    International Nuclear Information System (INIS)

    1987-12-01

    The Salt Repository Program (SRP) Input to Seismic Design (ISD) documents the assumptions, rationale, approaches, judgments, and analyses that support the development of seismic-specific data and information to be used for shaft design in accordance with the SRP Shaft Design Guide (SDG). The contents of this document are divided into four subject areas: (1) seismic assessment, (2) stratigraphy and material properties for seismic design, (3) development of seismic design parameters, and (4) host media stability. These four subject areas have been developed considering expected conditions at a proposed site in Deaf Smith County, Texas. The ISD should be used only in conjunction with seismic design of the exploratory and repository shafts. Seismic design considerations relating to surface facilities are not addressed in this document. 54 refs., 55 figs., 18 tabs

  12. Power supply projects a collection of innovative and practical design projects

    CERN Document Server

    Maplin

    1996-01-01

    Using circuit diagrams, PCB layouts, parts lists and clear construction and installation details, this book provides everything someone with a basic knowledge of electronics needs to know in order to put that knowledge into practice.This latest collection of Maplin projects are a variety of power supply projects, the necessary components for which are readily available from the Maplin catalogue or any of their high street shops. Projects include, laboratory power supply projects for which there are a wide range of applications for the hobbyist, from servicing portable audio and video equipment

  13. A Systems View of the USMA Staff Redesign

    National Research Council Canada - National Science Library

    McGinnis, Mike L

    2004-01-01

    ...; a major hindrance to the Academy's pursuit of excellence and higher performance. This report presents a USMA staff design that will align and enhance the synergy between USMA staff elements, lower levels staffs, and the West Point Garrison Command.

  14. Computer software design description for the Treated Effluent Disposal Facility (TEDF), Project L-045H, Operator Training Station (OTS)

    International Nuclear Information System (INIS)

    Carter, R.L. Jr.

    1994-01-01

    The Treated Effluent Disposal Facility (TEDF) Operator Training Station (OTS) is a computer-based training tool designed to aid plant operations and engineering staff in familiarizing themselves with the TEDF Central Control System (CCS)

  15. Making Education: Governance by Design: Notes from a book project

    DEFF Research Database (Denmark)

    Rasmussen, Lisa Rosén

    2017-01-01

    in and through material school designs: from the material and aesthetic language of schooling to the design of the built environment, from spatial organisation to the furnishing and equipment of classrooms and from technologies of regulation to the incorporation of tools of learning. Over the last decades......, governance as a concept developed within political science has gained a growing popularity in an increased number of research fields, also within the field of educational research (Amos 2010). Recent theories on governance open up to look at governance beyond political decision-making processes and state...... in the book focus on design processes and on designers/architects and people involved in the planning of school design as well as on school leaders, teachers and pupils adopting, inhabiting and re-shaping them in everyday school life. By stressing the processual aspects of school designs, the book puts...

  16. Industrial Sponsor Perspective on Leveraging Capstone Design Projects to Enhance Their Business

    Science.gov (United States)

    Weissbach, Robert S.; Snyder, Joseph W.; Evans, Edward R., Jr.; Carucci, James R., Jr.

    2017-01-01

    Capstone design projects have become commonplace among engineering and engineering technology programs. These projects are valuable tools when assessing students, as they require students to work in teams, communicate effectively, and demonstrate technical competency. The use of industrial sponsors enhances these projects by giving these projects…

  17. Research-Informed Curriculum Design for a Master's-Level Program in Project Management

    Science.gov (United States)

    Bentley, Yongmei; Richardson, Diane; Duan, Yanqing; Philpott, Elly; Ong, Vincent; Owen, David

    2013-01-01

    This article reports on the application of Research-Informed Curriculum Design (RICD) for the development and implementation of an MSc Program in Project Management. The research focused on contemporary issues in project management and provided an analysis of project management approaches, tools, and techniques currently used in organizations.…

  18. Design and implementation of a financial planning and tracking system for the Nova Project

    International Nuclear Information System (INIS)

    Holcomb, F.

    1982-01-01

    The Nova project is a 185 million dollar DOE funded project to build an experimental facility to demonstrate the thermonuclear ignition of laser fusion targets. This paper describes the design and implementation considerations for the project's computerized performance measurement financial planning and tracking system and critiques its actual operation

  19. Design of project management system for 10 MW high temperature gas-cooled test reactor

    International Nuclear Information System (INIS)

    Zhu Yan; Xu Yuanhui

    1998-01-01

    A framework of project management information system (MIS) for 10 MW high temperature gas-cooled test reactor is introduced. Based on it, the design of nuclear project management information system and project monitoring system (PMS) are given. Additionally, a new method of developing MIS and Decision Support System (DSS) has been tried

  20. Reflexive project management in high-ambition projects : Exploring the competencies for managing innovative sustainable designs

    NARCIS (Netherlands)

    Loeber, A.; Vermeulen, T.

    2016-01-01

    Purpose The Aristotelian notion of phronèsis inspired innovative work in the realm of project management as well as in literature on sustainability and societal transformations. We argue that both literatures may benefit from a dialogue between the two, especially in view of outlining project

  1. Re-designing project management : Steps towards a project management curriculum for a sustainable built environment

    NARCIS (Netherlands)

    Heintz, J.L.; Lousberg, L.H.M.J.; Prins, M.

    2015-01-01

    Sustainability concerns add a wide range of both stakeholders and performance expectations to building projects. The transition of a circular economy will also have a significant impact on the way in which building projects are carried out. This in addition to an already established escalation of

  2. Organization Design for Dynamic Fit: A Review and Projection

    Directory of Open Access Journals (Sweden)

    Mark Nissen

    2014-08-01

    Full Text Available The concept of fit is central to organization design. In the organizational literature, fit historically has been portrayed as a static concept. Both organizations and their environments, however, are continually changing, so a valid concept of fit needs to reflect organizational dynamics. In this article, I analyze various theoretical perspectives and studies that relate to organizational fit, differentiating those that employ an equilibrating or a fluxing approach. Four substantive themes emerge from this analysis: design orientation, design tension, designer/manager roles, and measurement and validation. Implications of each of these themes for dynamic fit are derived, and promising future research directions are discussed.

  3. Low Thrust Trajectory Design for GSFC Missions Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The Evolutionary Mission Trajectory Generator (EMTG) is a global trajectory optimization tool. EMTG is intended for use in designing interplanetary missions which...

  4. Designing and conducting health system research projects, volume ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    These 'green modules'* found their way to Malaysia, where Indra ..... They determine nutritional and hygiene practices, alert children to dangers, provide care in ... money from taxes and donor agencies to finance the health care system. .... The principle of cost-effectiveness is important in the selection of research projects.

  5. Process performance indicators in project pre-design stage

    NARCIS (Netherlands)

    Haponava, T.; Al-Jibouri, Saad H.S.; Reymen, Isabelle; Scheublin, F.; Pronk, A.; Prins, M.; Emmitt, S.; den Otter, A

    2006-01-01

    Traditionally performance in construction is measured based on the "iron-triangle”- time, cost and quality. In recent years indicators have been developed to include the measurements of other aspects of project performance. The main shortcoming of these however is that most of them are lagging

  6. Floods of the Past, Design of Tomorrow - Project Introduction

    NARCIS (Netherlands)

    Cohen, K.M.; Schielen, R.; van der Meulen, B.; Bomers, A.; Hulscher, S.J.M.H.; Middelkoop, H.

    2016-01-01

    A joint research project (two PhD’s, 2016-2020) has been granted to Utrecht University and the University of Twente, on the topic of detailed hydraulic modelling of selected largest-known historic river floods affecting the Lower Rhine valley and delta (The Netherlands and adjacent Germany). Besides

  7. High-Efficiency Klystron Design for the CLIC Project

    CERN Document Server

    Mollard, Antoine; Peauger, Franck; Plouin, Juliette; Beunas, Armel; Marchesin, Rodolphe

    2017-01-01

    The CLIC project requests new type of RF sources for the high power conditioning of the accelerating cavities. We are working on the development of a new kind of high-efficiency klystron to fulfill this need. This work is performed under the EuCARD-2 European program and involves theoretical and experimental study of a brand new klystron concept.

  8. Design status of the Delfi-Next nanosatellite project

    NARCIS (Netherlands)

    Bouwmeester, J.; Brouwer, G.F.; Gill, E.K.A.; Monna, G.L.E.; Rotteveel, J.

    2010-01-01

    Delfi-Next is the second project within the Delfi nanosatellite development program of Delft University of Technology. It will provide students hands-on experience, facilitate technology demonstration for innovative miniaturized space technology from the Dutch space sector and allow advancements in

  9. Integration and the hold-up problem in the design organization for engineering projects

    NARCIS (Netherlands)

    Zerjav, Vedran; Hartmann, Timo; Javernick-Will, A.; Chinowsky, P.

    2012-01-01

    The paper presents a perspective of the design organization in engineering projects based on the economic concept of the hold-up problem. By integrating the economic theories on the boundaries of organizations into the existing knowledge on design in engineering projects, the paper hypothesizes a

  10. An intelligent and interactive carpet role of design in a textile innovation project

    NARCIS (Netherlands)

    Deckers, E.J.L.; Stouw, van der B.; Peutz, J.

    2012-01-01

    This paper presents an ongoing innovation project on the development of an intelligent and interactive carpet called PeR+, short for Perception Rug Plus. This design-research project is a collaboration between an international flooring company, DESSO, and the Department of Industrial Design at the

  11. The Impact of Group Design Projects in Engineering on Achievement Goal Orientations and Academic Outcomes

    Science.gov (United States)

    Rambo-Hernandez, Karen E.; Atadero, Rebecca A.; Balgopal, Meena

    2017-01-01

    This study examined the impact of incorporating group design projects into a second-year engineering class on achievement goal orientations and two academic outcomes: concept inventory and final exam scores. In this study, two sections were taught using lecture format, but one section also completed three group design projects as part of their…

  12. A New Project-Based Curriculum of Design Thinking with Systems Engineering Techniques

    NARCIS (Netherlands)

    Haruyama, S.; Kim, S.K.; Beiter, K.A.; Dijkema, G.P.J.; De Weck, O.L.

    2012-01-01

    We developed a new education curriculum called "ALPS" (Active Learning Project Sequence) at Keio University that emphasizes team project-based learning and design thinking with systems engineering techniques. ALPS is a 6 month course, in which students work as a team and design and propose

  13. Design Project on Controlled-Release Drug Delivery Devices: Implementation, Management, and Learning Experiences

    Science.gov (United States)

    Xu, Qingxing; Liang, Youyun; Tong, Yen Wah; Wang, Chi-Hwa

    2010-01-01

    A design project that focuses on the subject of controlled-release drug delivery devices is presented for use in an undergraduate course on mass transfer. The purpose of the project is to introduce students to the various technologies used in the fabrication of drug delivery systems and provide a practical design exercise for understanding the…

  14. Development and Evaluation of an Undergraduate Multidisciplinary Project Activity in Engineering and Design

    Science.gov (United States)

    Smith, David R.; Cole, Joanne

    2012-01-01

    The School of Engineering and Design Multidisciplinary Project (MDP) at Brunel University is a one week long project based activity involving first year undergraduate students from across the School subject areas of Electronic and Computer Engineering, Mechanical Engineering, Civil Engineering and Design. This paper describes the main aims of the…

  15. Project-Based Pedagogy for the Facilitation of Webpage Design

    Science.gov (United States)

    Jakovljevic, Maria; Ankiewicz, Piet

    2016-01-01

    Real issues of web design and development include many problem-solving tasks. There are, however, some inadequacies associated with the implementation of appropriate pedagogy for organised and structured instruction that supports the rational problem-solving paradigm. The purpose of this article is to report on a study for the design and…

  16. Hanford Waste Vitrification Plant Project advanced conceptual design summary report

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1988-11-01

    The Hanford Waste Vitrification Plant (HWVP) will immobilize Hanford defense liquid high-level waste in borosilicate glass in preparation for shipment to a geologic repository. The shipment of the waste to the repository will satisfy an objective in the President's Defense Waste Management Plan. The glass product will be cast into stainless steel canisters, which will be sealed and stored at Hanford until they are shipped. This document summarizes work performed during the Advance Conceptual Design (ACD) of the HWVP. In the Reference Conceptual Design phase, which preceded the ACD, a number of design issues were identified with the potential to improve cost effectiveness, safety, constructibility, and operability. The ACD addressed and evaluated these design issues. Implementation of recommendations derived from ACD work will occur in subsequent design phases. The next design phase is preliminary design which will be followed by detailed design and construction. Net potential cost improvements of more than $36.9M were identified along with improvements in safety, constructibility, and operability. No negative schedule impacts will result from implementation of the improvements. 11 refs., 5 figs., 3 tabs

  17. Environmental Impact Assessment (Eia) On Project Design: An ...

    African Journals Online (AJOL)

    PROF. O. E. OSUAGWU

    2013-09-01

    Sep 1, 2013 ... The research work, studied and exposed the nature, concept and ... at 0.05 level of significance; and in the presentation of the field survey ... A relationship between the cost of EIA exercise and the cost of design was .... cited by [1], EIA is an activity designed to .... researchers based on their desire to limit the.

  18. Shippingport Spent Fuel Canister (SSFC) Design Report Project W-518

    International Nuclear Information System (INIS)

    JOHNSON, D.M.

    2000-01-01

    The SSFC Design Report Describes A spent fuel canister for Shippingport Core 2 blanket fuel assemblies. The design of the SSFC is a minor modification of the MCO. The modification is limited to the Shield Plug which remains unchanged with regard to interfaces with the canister shell. The performance characteristics remain those for the MCO, which bounds the payload of the SSFC

  19. USL/DBMS NASA/PC R and D project system design standards

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Moreau, Dennis R.

    1984-01-01

    A set of system design standards intended to assure the completeness and quality of designs developed for PC research and development projects is established. The standards presented address the areas of problem definition, initial design plan, design specification, and re-evaluation.

  20. Rapid E-learning Development Strategies and a Multimedia Project Design Model

    Science.gov (United States)

    Sözcü, Ömer Faruk; Ipek, Ismail

    2014-01-01

    The purpose of the study is to discuss e-learning design strategies which can be used for multimedia projects as a design model. Recent advances in instructional technologies have been found to be very important in the design of training courses by using rapid instructional design (ID) approaches. The approaches were developed to use in training…

  1. A First Implementation of a Design Thinking Workshop During a Mobile App Development Project Course

    OpenAIRE

    Pham, Yen Dieu; Fucci, Davide; Maalej, Walid

    2018-01-01

    Due to their characteristics, millennials prefer learning-by-doing and social learning, such as project-based learning. However, software development projects require not only technical skills but also creativity; Design Thinking can serve such purpose. We conducted a workshop following the Design Thinking approach of the d.school, to help students generating ideas for a mobile app development project course. On top of the details for implementing the workshop, we report our observations, les...

  2. User-inspired design methodology using Affordance Structure Matrix (ASM) for construction projects

    OpenAIRE

    Maheswari J. Uma; Charlesraj V. Paul C.; Battacharya Soma

    2017-01-01

    Traditionally, design phase of construction projects is often performed with incomplete and inaccurate user preferences. This is due to inefficiencies in the methodologies used for capturing the user requirements that can subsequently lead to inconsistencies and result in non-optimised end-result. Iterations and subsequent reworks due to such design inefficiencies is one of the major reasons for unsuccessful project delivery as they impact project performance measures such as time and cost am...

  3. Advanced conceptual design report. Phase II. Liquid effluent treatment and disposal Project W-252

    International Nuclear Information System (INIS)

    1995-01-01

    This Advanced Conceptual Design Report (ACDR) provides a documented review and analysis of the Conceptual Design Report (CDR), WHC-SD-W252-CDR-001, June 30, 1993. The ACDR provides further design evaluation of the major design approaches and uncertainties identified in the original CDR. The ACDR will provide a firmer basis for the both the design approach and the associated planning for the performance of the Definitive Design phase of the project

  4. Solid Waste Operations Complex W-113: Project cost estimate. Preliminary design report. Volume IV

    International Nuclear Information System (INIS)

    1995-01-01

    This document contains Volume IV of the Preliminary Design Report for the Solid Waste Operations Complex W-113 which is the Project Cost Estimate and construction schedule. The estimate was developed based upon Title 1 material take-offs, budgetary equipment quotes and Raytheon historical in-house data. The W-113 project cost estimate and project construction schedule were integrated together to provide a resource loaded project network

  5. Leveraging Entrepreneurship through the design of Artificial Intelligence Projects

    OpenAIRE

    Osegi , E.N; Wokoma , B.A; Bruce-Allison , S.A

    2017-01-01

    Conference Proceeding: Port-Harcourt School of Engineering Science and Technology, Port-Harcourt, Rivers State, Nigeria, 2017; International audience; Artificial Intelligence projects (AIP), is currently attracting popular attention as a viable business area for young and mature entrepreneurs. Most industries, particularly in research and development, now use AIPs for the discovery and synthesis of countless of novel products and services of incomprehensible commercial and functional value. H...

  6. History of Road Design Standards in LADOTD : Research Project Capsule

    Science.gov (United States)

    2012-10-01

    According to the Louisiana Statewide Transportation Plan, Louisianas highway : network is comprised of over 60,000 miles, of which over 16,000 miles are : maintained by the state. The roadways were designed and constructed : according to the desig...

  7. KiloPower Project - KRUSTY Experiment Nuclear Design

    Energy Technology Data Exchange (ETDEWEB)

    Poston, David Irvin [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Godfroy, Thomas [NASA Marshall Space Flight Center (MSFC), Huntsville, AL (United States); Mcclure, Patrick Ray [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Sanchez, Rene Gerardo [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-07-20

    This PowerPoint presentation covers the following topics: Reference Kilopower configuration; Reference KRUSTY configuration; KRUSTY design sensitivities; KRUSTY reactivity coefficients; KRUSTY criticality safety and control; KRUSTY core activation/dose; and KRUSTY shielding, room activation/dose.

  8. Quality management in construction project design and management

    CSIR Research Space (South Africa)

    Conradie, Dirk CU

    2008-03-01

    Full Text Available (1991), being an artificial intelligence researcher, thought that this indicated that creative designs should be generated from experience such as the use of Case-based Reasoning (CBR) and not deductive rules. • Problems may be barely decomposable.... It is sometimes possible to break problems down into smaller sub problems. However, these sub problems tend to be highly inter- constrained. Researchers in the Artificial Intelligence field of CBR thought that this indicated that new designs should be based...

  9. Mechanical Engineering Design Project report: Enabler control systems

    Science.gov (United States)

    Cullen, Christian; Delvecchio, Dave; Scarborough, Alan; Havics, Andrew A.

    1992-01-01

    The Controls Group was assigned the responsibility for designing the Enabler's control system. The requirement for the design was that the control system must provide a simple user interface to control the boom articulation joints, chassis articulation joints, and the wheel drive. The system required controlling hydraulic motors on the Enabler by implementing 8-bit microprocessor boards. In addition, feedback to evaluate positions and velocities must be interfaced to provide the operator with confirmation as well as control.

  10. EC6 design features and pre-project licensing review

    Energy Technology Data Exchange (ETDEWEB)

    Yu, S.; Lee, A.G.; Dinh, N.B.; Soulard, M. [CANDU Energy Inc., Mississauga, Ontario, (Canada)

    2013-07-01

    The Enhanced CANDU 6 (EC6) is the new Generation III CANDU reactor design that meets the most up to date Canadian regulatory requirements and customer expectations. Candu Energy Inc. is finalizing development of the EC6 which incorporates the CANDU 6's well-proven features, and adds enhancements that strengthened reactor safety margin and improved operability. The EC6 builds on the proven high performance design and the defence-in-depth features of CANDU 6 units, and has incorporated extensive operational feedback including lessons learned from Fukushima. This paper will provide status of the engineering program including progress on the pre-licensing review of the EC6 design by the Canadian Regulator, CNSC, and will also highlight the design and safety enhancements incorporated in the EC6 product. Safety enhancements to meet safety goals and to improve robustness of systems to respond to design basis accidents and beyond design basis accidents include: new severe accident recovery and heat removal system; improved emergency heat removal system; faster shutoff rods with improved safety margins; mechanical guaranteed shutdown rods; daily load cycling capability; robust containment with containment filter venting system; and improved backed-up electrical supply and cooling services. (author)

  11. Sustainability in the Architectural Design Studio: A Case Study of Designing On-Campus Academic Staff Housing in Konya and Izmir, Turkey

    Science.gov (United States)

    Bala, Havva Alkan

    2010-01-01

    It is important to engender a "sustainable" architectural consciousness in the students who will be the next generation architects. In architectural education, design decisions taken during the early phases of the design process play an important role in ensuring concern for the sustainability issue. But, in general, all discussions…

  12. Personal Staff - Joint Staff - The National Guard

    Science.gov (United States)

    the ARNG Deputy Director of the ARNG Chief of Staff of the ARNG Command Chief Warrant Officer of the Site Maintenance Battle Focused Training Strategy Battle Staff Training Resources News Publications March Today in Guard History Leadership CNGB VCNGB SEA DANG DARNG Joint Staff J-1 J-2 J-3 J-4 J-5 J-6 J

  13. Training Sessional Academic Staff to Provide Quality Feedback on University Students' Assessment: Lessons from a Faculty of Law Learning and Teaching Project

    Science.gov (United States)

    Richards, Kelly; Bell, Tamara; Dwyer, Angela

    2017-01-01

    The quality of feedback provided to university students has long been recognised as the most important predictor of student learning and satisfaction. However, providing quality feedback to students is challenging in the current context, in which universities increasingly rely on casualised and inexperienced academic staff to assess undergraduate…

  14. Design criteria and design basis for the 100-HR-3 and 100-KR-4 pump-and-treat projects

    International Nuclear Information System (INIS)

    McKinley, W.S.; Winters, J.N.

    1996-06-01

    The 100-HR-3 and 100-KR-4 Operable Units are located in the 100 Area at the Hanford Site in Richland, Washington. The document describes the project objectives and design criteria to be used for the 100-HR-3 and 100-KR-4 groundwater pump-and-treat design activities

  15. A Typology of Engineering Designs in Problem-Based Projects

    DEFF Research Database (Denmark)

    Larsen, Samuel Brüning; Bigum, Per Valentin

    include a set of general characteristics of great engineering solutions and a typology of three solution archetypes. The study labels these archetypes as 1) the adapted solution, 2) the “either/or”-solution, and 3) the multiple-elements solution. For each archetype, the paper specifies the corresponding...... class of problems that the archetype can logically address. In addition, the paper delineates (1) how each archetype relates to a project’s analysis and (2) how each archetype is evaluated, implemented and operated. The typology aids both students and project supervisors in conducting reports...

  16. Mechanical Design Engineering Enabler Project wheel and wheel drives

    Science.gov (United States)

    Nutt, Richard E.; Couch, Britt K.; Holley, John L., Jr.; Garris, Eric S.; Staut, Paul V.

    1992-01-01

    Our group was assigned the responsibility of designing the wheel and wheel drive system for a proof-of-concept model of the lunar-based ENABLER. ENABLER is a multi-purpose, six wheeled vehicle designed to lift and transport heavy objects associated with the construction of a lunar base. The resulting design was based on the performance criteria of the ENABLER. The drive system was designed to enable the vehicle to achieve a speed of 7 mph on a level surface, climb a 30 percent grade, and surpass a one meter high object and one meter wide crevice. The wheel assemblies were designed to support the entire weight of the vehicle on two wheels. The wheels were designed to serve as the main component of the vehicle's suspension and will provide suitable traction for lunar-type surfaces. The expected performance of the drive system for the ENABLER was influenced by many mechanical factors. The expected top speed on a level sandy surface is 4 mph instead of the desired 7 mph. This is due to a lack of necessary power at the wheels. The lack of power resulted from dimension considerations that allowed only an eight horsepower engine and also from mechanical inefficiencies of the hydraulic system. However, the vehicle will be able to climb a 30 percent grade, surpass a one meter high object and one meter wide crevice. The wheel assemblies will be able to support the entire weight of the vehicle on two wheels. The wheels will also provide adequate suspension for the vehicle and sufficient traction for lunar-type surfaces.

  17. iPhone Design Award-Winning Projects

    CERN Document Server

    Dannen, Chris

    2010-01-01

    This book profiles developers who have received the prestigious Apple Design Award for iPhone app excellence. You'll learn all about what makes these apps truly standout, including explanations of great user interface design and implementation, as well as the code under the hood that makes these the most responsive, intuitive, useful, and just plain fun apps running on the iPhone. * Insightful profiles of the developers behind Tweetie, Topple 2, AccuTerra, Postage, and Wooden Labyrinth 3D* Detailed explanations of the technical wizardry that makes these apps tick* Full-color screenshots and co

  18. Formal design review report project W-151 mixer pump procurement

    Energy Technology Data Exchange (ETDEWEB)

    Crass, D.W.

    1997-01-21

    A formal design review for WHC-S-0040 was held on January 21, 1993. The review was completed January 29, 1993. No outstanding action items existed. Comments were recorded on Record Comment Record (RCR) forms and incorporated into the specification. The specification was considered acceptable, approved and issued as WHC-S-0040, Rev. 0 on March 4, 1993.

  19. Involving Assessment Buddies in the Assessment of Design Project Work

    Science.gov (United States)

    Osmond, Jane; Clough, Brian

    2012-01-01

    This paper discusses the impact of a specially developed assessment and feedback system implemented within a second year industrial design module at Coventry University, UK. The "Assessment Buddy" system was developed in response to the need for a successful assessment and feedback method that could cope with the complexities of a…

  20. Developing 21st Century Process Skills through Project Design

    Science.gov (United States)

    Yoo, Jeong-Ju; MacDonald, Nora M.

    2014-01-01

    The goal of this paper is to illustrate how the promotion of 21st Century process skills can be used to enhance student learning and workplace skill development: thinking, problem solving, collaboration, communication, leadership, and management. As an illustrative case, fashion merchandising and design students conducted research for a…

  1. Procurement strategy formation : (re-)designing rail infrastructure project alliances

    NARCIS (Netherlands)

    Plantinga, Henrico; Dorée, André

    2016-01-01

    Purpose – The purpose of this paper is to provide insights into the reasoning behind the development of new procurement approaches by public sector clients. Design/methodology/approach – A case study approach focuses on a procurement development process by a public sector client. It investigates the

  2. IT Requirements Integration in High-Rise Construction Design Projects

    Science.gov (United States)

    Levina, Anastasia; Ilin, Igor; Esedulaev, Rustam

    2018-03-01

    The paper discusses the growing role of IT support for the operation of modern high-rise buildings, due to the complexity of managing engineering systems of buildings and the requirements of consumers for the IT infrastructure. The existing regulatory framework for the development of design documentation for construction, including high-rise buildings, is analyzed, and the lack of coherence in the development of this documentation with the requirements for the creation of an automated management system and the corresponding IT infrastructure is stated. The lack of integration between these areas is the cause of delays and inefficiencies both at the design stage and at the stage of putting the building into operation. The paper proposes an approach to coordinate the requirements of the IT infrastructure of high-rise buildings and design documentation for construction. The solution to this problem is possible within the framework of the enterprise architecture concept by coordinating the requirements of the IT and technological layers at the design stage of the construction.

  3. The design explorer project: Using a cognitive framework to support knowledge exploration

    DEFF Research Database (Denmark)

    Pejtersen, A. M.; Sonnenwald, D.H.; Buur, J.

    1997-01-01

    the 'Design Explorer' research project whose goal is to specify requirements for an information system that will effectively help design team members from different domains and organizational cultures to locate and utilize diverse information sources and interact more effectively throughout the design process....... The project introduces a new approach to support of design; instead of design guidelines, support is given by creating a transparent information environment in which designers can navigate freely according to their individual preferences. The project is based on a framework that structures the dimensions......, and various related task spaces, domain activities, decisionmaking activities, division and coordination of work, and social organization. The framework is the result of a generalization of experiences from field studies in and design of support systems for a variety of modern work domains, such as process...

  4. Educational designs supporting student engagement through networked project studies

    DEFF Research Database (Denmark)

    Lerche Nielsen, Jørgen; Andreasen, Lars Birch

    2013-01-01

    within a networked learning structure are studying in groups combining on-site seminars with independent and challenging virtually organized project periods, implementing new educational technology, which require teachers who are flexible and aware of the different challenges in the networked environment...... activities that unfold. This interplay is important in order to make a difference, as the experience is that new technologies do not in themselves guarantee increasing learning quality. The chapter will discuss examples of how learners as well as teachers have developed imaginative ways of implementing new...... technological possibilities in educational settings. The examples will include how sometimes seemingly simple technologies can be used in innovative pedagogical ways to increase learners’ involvement. Another example to be discussed in the chapter derives from an online seminar on ICT and Learning...

  5. Linac design for the LCLS project at SLAC

    International Nuclear Information System (INIS)

    Bharadwaj, V.K.; Bane, K.; Clendenin, J.

    1997-05-01

    The Linac Coherent Light Source (LCLS) at SLAC is being designed to produce intense, coherent 0.15-nm x-rays. These x-rays will be produced by a single pass of a 15 GeV bunched electron beam through a long undulator. Nominally, the bunches have a charge of 1 nC, normalized transverse emittances of less than 1.5π mm-mr and an rms bunch length of 20 μm. The electron beam will be produced using the last third of the SLAC 3-km linac in a manner compatible with simultaneous operation of the remainder of the linac for PEP-II. The linac design necessary to produce an electron beam with the required brightness for LCLS is discussed, and the specific linac modifications are described

  6. A Nordic Project Project on High Speed Low Power Design in Sub-micron CMOS Technology for Mobile

    DEFF Research Database (Denmark)

    Olesen, Ole

    1997-01-01

    circuit design is based on state-of-the-art CMOS technology (0.5µm and below) including circuits operating at 2GHz. CMOS technology is chosen, since a CMOS implementation is likely to be significantly cheaper than a bipolar or a BiCMOS solution, and it offers the possibility to integrate the predominantly...... of including good off-chip components in the design by use of innovative, inexpensive package technology.To achieve a higher level of integration, the project will use a novel codesign approach to the design strategy. Rather than making specifications based on a purely architectural approach, the work uses...

  7. Nature-inspired design strategies in sustainable product development : A case study of student projects

    NARCIS (Netherlands)

    De Pauw, I.C.; Karana, E.; Kandachar, P.V.

    2012-01-01

    In design practice, Nature-Inspired Design Strategies (NIDS) can be applied when developing sustainable products. However, knowledge on how this actually helps designers is lacking. This study explores the effects of applying Cradle to Cradle and Biomimicry in student projects, as compared to using

  8. Implementation of Effective Capstone Projects in Undergraduate Manufacturing Design Engineering Program

    Science.gov (United States)

    Viswanathan, Shekar

    2017-01-01

    Final program projects (capstone course) in manufacturing design engineering technology at National University are intensive experiences in critical thinking and analysis, designed to broaden students' perspectives and provide an opportunity for integration of coursework in the area of manufacturing design engineering. This paper focuses on three…

  9. Formal and informal computer mediated communication within within design teams for complex building projects

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Gray, C.; Prins, M.

    2001-01-01

    In this paper the information environment of design teams is discussed because of the use of Internet based Project websites (PWS) to improve the information exchange within design teams. Because design teams heavenly depend on informal information exchange and PWS is a tool for formalising

  10. A Project-Based Learning Approach to Programmable Logic Design and Computer Architecture

    Science.gov (United States)

    Kellett, C. M.

    2012-01-01

    This paper describes a course in programmable logic design and computer architecture as it is taught at the University of Newcastle, Australia. The course is designed around a major design project and has two supplemental assessment tasks that are also described. The context of the Computer Engineering degree program within which the course is…

  11. Designing “Theory of Machines and Mechanisms” course on Project Based Learning approach

    DEFF Research Database (Denmark)

    Shinde, Vikas

    2013-01-01

    by the industry and the learning outcomes specified by the National Board of Accreditation (NBA), India; this course is restructured on Project Based Learning approach. A mini project is designed to suit course objectives. An objective of this paper is to discuss the rationale of this course design......Theory of Machines and Mechanisms course is one of the essential courses of Mechanical Engineering undergraduate curriculum practiced at Indian Institute. Previously, this course was taught by traditional instruction based pedagogy. In order to achieve profession specific skills demanded...... and the process followed to design a project which meets diverse objectives....

  12. Design and planning of the Henderson Mine ventilation upgrade project

    Energy Technology Data Exchange (ETDEWEB)

    Loring, D.M.; Shea, N.A. [Climax Molybdenum Co., Henderson Operations, Empire, CO (United States)

    2010-07-01

    The average molybdenum ore throughput at the Henderson Mine near Denver, Colorado increased significantly between 2003 and 2007. In response, the Climax Molybdenum Company updated the life-of-mine plan which resulted in significant changes to the ventilation requirements of the mine. This paper outlined the mine and ventilation planning efforts. The design options that were evaluated to upgrade the ventilation system were also described along with the final design that was chosen to support the updated mine plan. The mine uses an exhaust ventilation system in which ventilation is supplied through a service shaft, an intake shaft and a long ore haulage tunnel. Currently, air is exhausted through 2 exhaust shafts. The new reserve model that was completed in 2007 incorporated updated geologic information and mix/dilution models. An evaluation of the new life-of-mine plans and production sequences drove the development of a new ventilation plan that increased the airflow requirements of the mine. The primary design concerns were radon control; reduction of diesel particulate matter; silica dust; blasting and other gases; and climate control. Ventilation requirements were also updated based on the final exposure limits stipulated in the 2008 regulations of the Mine Safety and Health Administration. 4 refs., 11 tabs., 8 figs.

  13. Is the amount of exposure to aggressive challenging behaviour related to staff work-related well-being in intellectual disability services? Evidence from a clustered research design.

    Science.gov (United States)

    Flynn, Samantha; Hastings, Richard P; Gillespie, David; McNamara, Rachel; Randell, Elizabeth

    2018-04-17

    Previous research has demonstrated an association between aggressive challenging behaviour (CB) and reductions in work-related well-being for intellectual disability (ID) support staff. Much of this research has used subjective measures of CB. To examine whether exposure to aggressive CB is associated with reduced work-related well-being in staff working in ID residential settings across the UK. A cross-sectional analysis was undertaken as part of a randomised trial; 186 staff from 100 settings completed questionnaires on their CB self-efficacy, empathy, positive work motivation, and burnout. Objective measures of aggressive CB in the preceding 16 weeks were collected from each setting. There was little association between staff exposure to aggressive CB and work-related well-being. Clustering effects were found for emotional exhaustion and positive work motivation, suggesting these variables are more likely to be influenced by the environment in which staff work. The level of clustering may be key to understanding how to support staff working in ID residential settings, and should be explored further. Longitudinal data, and studies including a comparison of staff working in ID services without aggressive CB exposure are needed to fully understand any association between aggressive CB and staff well-being. Copyright © 2018 Elsevier Ltd. All rights reserved.

  14. Multimegajoule laser project: new compact multipass laser design

    International Nuclear Information System (INIS)

    Holzrichter, J.F.

    1985-01-01

    A simple laser design that has the fewest laser components of all fusion systems that the authors have studied and that packs closely, thus minimizing space requirements is shown. The Advanced Laser Program objectives are determined by the requirements of the subsystems. The requirements consists of the following elements: high damage thresholds on reflectors; AR layers and dichroic coatings; high-efficiency amplifiers; low-cost production of laser glass, pulse power, and optical elements; and special optical elements, such as an effective phase conjugator and isolator. The combination of a compact architecture and lower-cost, higher-performance components can lead to significant reduction in overall system cost

  15. Managing nuclear projects: a design agency experience in the design-build of waste management facilities in Canada

    International Nuclear Information System (INIS)

    Brewer, R.; Calzolari, L.

    2006-01-01

    Quality Assurance guarantees the quality of a product; it does not guarantee that it is a quality product. As procedures develop to satisfy QA programs and regulatory needs it is necessary to find ways to ensure that procedural management reinforces project management and does not detract from it. CANATOM NPM's experience in bidding for and executing the design or design and construction of nuclear waste management facilities demonstrates how design excellence and innovation can still be achieved while successfully managing the challenge of technical administration. The sourcing of expertise, the intricacies of design definition and the coordinating efforts required in the execution of the projects (one fully completed, the other into its engineering phase) will provide a valuable insight into the role and activities of an engineering company engaged in a 'Design Agency' (DA) role. (author)

  16. A projection method for under determined optimal experimental designs

    KAUST Repository

    Long, Quan; Scavino, Marco; Tempone, Raul; Wang, Suojin

    2014-01-01

    A new implementation, based on the Laplace approximation, was developed in (Long, Scavino, Tempone, & Wang 2013) to accelerate the estimation of the post–experimental expected information gains in the model parameters and predictive quantities of interest. A closed–form approximation of the inner integral and the order of the corresponding dominant error term were obtained in the cases where the parameters are determined by the experiment. In this work, we extend that method to the general cases where the model parameters could not be determined completely by the data from the proposed experiments. We carry out the Laplace approximations in the directions orthogonal to the null space of the corresponding Jacobian matrix, so that the information gain (Kullback–Leibler divergence) can be reduced to an integration against the marginal density of the transformed parameters which are not determined by the experiments. Furthermore, the expected information gain can be approximated by an integration over the prior, where the integrand is a function of the projected posterior covariance matrix. To deal with the issue of dimensionality in a complex problem, we use Monte Carlo sampling or sparse quadratures for the integration over the prior probability density function, depending on the regularity of the integrand function. We demonstrate the accuracy, efficiency and robustness of the proposed method via several nonlinear under determined numerical examples.

  17. A projection method for under determined optimal experimental designs

    KAUST Repository

    Long, Quan

    2014-01-09

    A new implementation, based on the Laplace approximation, was developed in (Long, Scavino, Tempone, & Wang 2013) to accelerate the estimation of the post–experimental expected information gains in the model parameters and predictive quantities of interest. A closed–form approximation of the inner integral and the order of the corresponding dominant error term were obtained in the cases where the parameters are determined by the experiment. In this work, we extend that method to the general cases where the model parameters could not be determined completely by the data from the proposed experiments. We carry out the Laplace approximations in the directions orthogonal to the null space of the corresponding Jacobian matrix, so that the information gain (Kullback–Leibler divergence) can be reduced to an integration against the marginal density of the transformed parameters which are not determined by the experiments. Furthermore, the expected information gain can be approximated by an integration over the prior, where the integrand is a function of the projected posterior covariance matrix. To deal with the issue of dimensionality in a complex problem, we use Monte Carlo sampling or sparse quadratures for the integration over the prior probability density function, depending on the regularity of the integrand function. We demonstrate the accuracy, efficiency and robustness of the proposed method via several nonlinear under determined numerical examples.

  18. Designing Knowledge Map for Knowledge Management projects Using Network Analysis

    Directory of Open Access Journals (Sweden)

    heidar najafi

    2017-09-01

    Full Text Available In this research knowledge management has been studied as an interdisciplinary area. We aim to find an answer for this question that "what are the scientific structure and knowledge map of knowledge management projects regarding these two aspect of subject areas and keywords. For this purpose, nearly 40000 scientific documents including knowledge management as one of their keywords were selected from Scopus database and were studied in various subject areas. In this research,bar charts have been drawn for each index of subject areas and keywords. Besides, using Co-occurrence matrix, adjacency graphs were drawn and then clustered using Average-Link algorithm. Bar charts and graphs were drawn using R and Excel software. The results of this research showed that among the researches on knowledge management in the world, the most relevant scientific fields to knowledge management are Computer Sciences with 32.5%, Business, Management and Accounting with 14.5%, Engineering with 13.7%, Decisive Sciences with 12.6%, Mathematics with 7.07%, and Social Sciences with 6.63%, respectively. The most keywords collocate with knowledge management in the world are Human-Computer Interaction, Information Management, Systems Management, Information Technology, Manufacturing, Acquisition of Knowledge, Semantics, Knowledge Transfer, Ontology and Information Retrieval.

  19. User-inspired design methodology using Affordance Structure Matrix (ASM for construction projects

    Directory of Open Access Journals (Sweden)

    Maheswari J. Uma

    2017-01-01

    Full Text Available Traditionally, design phase of construction projects is often performed with incomplete and inaccurate user preferences. This is due to inefficiencies in the methodologies used for capturing the user requirements that can subsequently lead to inconsistencies and result in non-optimised end-result. Iterations and subsequent reworks due to such design inefficiencies is one of the major reasons for unsuccessful project delivery as they impact project performance measures such as time and cost among others. The existing design theories and practice are primarily based on functional requirements. Function-based design deals with design of artifact alone, which may yield favourable or unfavourable consequences with the design artifact. However, incorporating other interactions such as interactions between user & designer is necessary for optimised end-result. Hence, the objective of this research work is to devise a systematic design methodology considering all the three interactions among users, designers and artefacts for improved design efficiency. In this study, it has been attempted to apply the theory of affordances in a case project that involves the design of an offshore facility. A step-by-step methodology for developing Affordance Structure Matrix (ASM, which integrates House of Quality (HOQ and Design Structure Matrix (DSM, is proposed that can effectively capture the user requirements. HOQ is a popular quality management tool for capturing client requirements and DSM is a matrix-based tool that can capture the interdependency among the design entities. The proposed methodology utilises the strengths of both the tools, as DSM compliments HOQ in the process. In this methodology, different affordances such as AUA (Artifact-User-Affordance, AAA (Artifact-Artifact-Affordance and DDA (Designer-Designer-Affordance are captured systematically. Affordance is considered to be user-driven in this context that is in contrast to prevailing design

  20. Experiences with Designing a Team Project Module for Teaching Teamwork to Students

    OpenAIRE

    Bieliková, Mária

    2005-01-01

    Team projects play an important role in the education of engineers. This paper describes a team project module (called Team project) that is part of a postgraduate course in Informatics. Its main objective is to give students a hands-on experience with different aspects of working in team on a problem. We discuss several aspects that should be considered in designing such module as a part of a curriculum: team formation, team communication, team assessment, problem statement and assignment, d...

  1. Functional design criteria for project W-252, phase II liquid effluent treatment and disposal. Revision 2

    International Nuclear Information System (INIS)

    Hatch, C.E.

    1995-05-01

    This document is the Functional Design Criteria for Project W-252. Project W-252 provides the scope to provide BAT/AKART (best available technology...) to 200 Liquid Effluent Phase II streams (B-Plant). This revision (Rev. 2) incorporates a major descoping of the project. The descoping was done to reflect a combination of budget cutting measures allowed by a less stringent regulatory posture toward the Phase II streams

  2. How design-inclusive UXR influenced the integration of project activities. Three design cases from industry

    NARCIS (Netherlands)

    van Kollenburg, J.W.M.; Bogers, S.J.A.; Deckers, E.J.L.; Frens, J.W.; Hummels, C.C.M.

    2017-01-01

    In this paper, we discuss how the implementation of design-inclusive User Experience Research (UXR) has influenced the composition of UXR and design activities in the industrial setting of Philips Design. We present three design case studies that were executed in a time span of three years: a baby

  3. A biotic game design project for integrated life science and engineering education.

    Directory of Open Access Journals (Sweden)

    Nate J Cira

    2015-03-01

    Full Text Available Engaging, hands-on design experiences are key for formal and informal Science, Technology, Engineering, and Mathematics (STEM education. Robotic and video game design challenges have been particularly effective in stimulating student interest, but equivalent experiences for the life sciences are not as developed. Here we present the concept of a "biotic game design project" to motivate student learning at the interface of life sciences and device engineering (as part of a cornerstone bioengineering devices course. We provide all course material and also present efforts in adapting the project's complexity to serve other time frames, age groups, learning focuses, and budgets. Students self-reported that they found the biotic game project fun and motivating, resulting in increased effort. Hence this type of design project could generate excitement and educational impact similar to robotics and video games.

  4. A biotic game design project for integrated life science and engineering education.

    Science.gov (United States)

    Cira, Nate J; Chung, Alice M; Denisin, Aleksandra K; Rensi, Stefano; Sanchez, Gabriel N; Quake, Stephen R; Riedel-Kruse, Ingmar H

    2015-03-01

    Engaging, hands-on design experiences are key for formal and informal Science, Technology, Engineering, and Mathematics (STEM) education. Robotic and video game design challenges have been particularly effective in stimulating student interest, but equivalent experiences for the life sciences are not as developed. Here we present the concept of a "biotic game design project" to motivate student learning at the interface of life sciences and device engineering (as part of a cornerstone bioengineering devices course). We provide all course material and also present efforts in adapting the project's complexity to serve other time frames, age groups, learning focuses, and budgets. Students self-reported that they found the biotic game project fun and motivating, resulting in increased effort. Hence this type of design project could generate excitement and educational impact similar to robotics and video games.

  5. Error begat error: design error analysis and prevention in social infrastructure projects.

    Science.gov (United States)

    Love, Peter E D; Lopez, Robert; Edwards, David J; Goh, Yang M

    2012-09-01

    Design errors contribute significantly to cost and schedule growth in social infrastructure projects and to engineering failures, which can result in accidents and loss of life. Despite considerable research that has addressed their error causation in construction projects they still remain prevalent. This paper identifies the underlying conditions that contribute to design errors in social infrastructure projects (e.g. hospitals, education, law and order type buildings). A systemic model of error causation is propagated and subsequently used to develop a learning framework for design error prevention. The research suggests that a multitude of strategies should be adopted in congruence to prevent design errors from occurring and so ensure that safety and project performance are ameliorated. Copyright © 2011. Published by Elsevier Ltd.

  6. Problem based Learning versus Design Thinking in Team based Project work

    DEFF Research Database (Denmark)

    Denise J. Stokholm, Marianne

    2014-01-01

    project based learning issues, which has caused a need to describe and compare the two models; in specific the understandings, approaches and organization of learning in project work. The PBL model viewing the process as 3 separate project stages including; problem analysis, problem solving and project......All educations at Aalborg University has since 1974 been rooted in Problem Based Learning (PBL). In 1999 a new education in Industrial design was set up, introducing Design Based Learning (DBL). Even though the two approaches have a lot in common they also hold different understandings of core...... report, with focus on problem solving through analysis. Design Based Learning viewing the process as series of integrated design spaces including; alignment, research, mission, vision, concept, product and process report, with focus on innovative ideation though integration. There is a need of renewing...

  7. Mechanistic-Empirical (M-E) Design Implementation & Monitoring for Flexible Pavements : 2018 PROJECT SUMMARY

    Science.gov (United States)

    2018-06-01

    This document is a summary of the tasks performed for Project ICT-R27-149-1. Mechanistic-empirical (M-E)based flexible pavement design concepts and procedures were previously developed in Illinois Cooperative Highway Research Program projects IHR-...

  8. Change Management for using a Project Website in Design Team Communication

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Emitt, S.; Prins, M.

    2005-01-01

    A Project Website (PWS) has been advocated as an important tool for design teams of construction projects, because the tool is supposed to greatly enhance team communication. This, finally, should result in improved team performance in terms of increase of efficiency and effectiveness. PWS vendors

  9. Learning Based on the Project Entitled "Design and Construction of a Wooden Bridge"

    Science.gov (United States)

    Barris, Cristina; Torres, Lluís; Simon, Enric

    2016-01-01

    This article presents the results of a case involving the application of project-based learning carried out with students in the Mechanical Engineering degree program at the University of Girona. The project, entitled "Design and construction of a wooden bridge", was conducted at the Polytechnic School in the third-year Structures…

  10. 13 CFR 305.4 - Projects for design and engineering work.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Projects for design and engineering work. 305.4 Section 305.4 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION... construction Project in a format and in sufficient quantity to permit advertisement and award of a construction...

  11. Implementing a Student-Designed Green Chemistry Laboratory Project in Organic Chemistry

    Science.gov (United States)

    Graham, Kate J.; Jones, T. Nicholas; Schaller, Chris P.; McIntee, Edward J.

    2014-01-01

    A multiweek organic chemistry laboratory project is described that emphasizes sustainable practices in experimental design. An emphasis on student-driven development of the project is meant to mirror the independent nature of research. Students propose environmentally friendly modifications of several reactions. With instructor feedback, students…

  12. Fort Hood Solar Total Energy Project. Volume II. Preliminary design. Part 1. System criteria and design description. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1979-01-01

    This volume documents the preliminary design developed for the Solar Total Energy System to be installed at Fort Hood, Texas. Current system, subsystem, and component designs are described and additional studies which support selection among significant design alternatives are presented. Overall system requirements which form the system design basis are presented. These include program objectives; performance and output load requirements; industrial, statutory, and regulatory standards; and site interface requirements. Material in this section will continue to be issued separately in the Systems Requirements Document and maintained current through revision throughout future phases of the project. Overall system design and detailed subsystem design descriptions are provided. Consideration of operation and maintenance is reflected in discussion of each subsystem design as well as in an integrated overall discussion. Included are the solar collector subsystem; the thermal storage subsystem, the power conversion sybsystem (including electrical generation and distribution); the heating/cooling and domestic hot water subsystems; overall instrumentation and control; and the STES building and physical plant. The design of several subsystems has progressed beyond the preliminary stage; descriptions for such subsystems are therefore provided in more detail than others to provide complete documentation of the work performed. In some cases, preliminary design parameters require specific verificaton in the definitive design phase and are identified in the text. Subsystem descriptions will continue to be issued and revised separately to maintain accuracy during future phases of the project. (WHK)

  13. Sensing and collecting radioactive materials as a project to teach engineering design

    International Nuclear Information System (INIS)

    Drake, D.; Majdi, T.; Strack, J.

    2015-01-01

    The remote detection and isolation of radioactive materials is both a challenging engineering design project and a relevant issue given modern nuclear circumstances. This project is used in the undergraduate capstone class of the Engineering Physics Department at McMaster University to teach students engineering design. This paper discusses the course outline and learning outcomes of the students who took the course over the 2014-2015 academic year. (author)

  14. Sensing and collecting radioactive materials as a project to teach engineering design

    Energy Technology Data Exchange (ETDEWEB)

    Drake, D.; Majdi, T.; Strack, J., E-mail: draked2@mcmaster.ca [McMaster University, Hamiltion, ON (Canada); and others

    2015-07-01

    The remote detection and isolation of radioactive materials is both a challenging engineering design project and a relevant issue given modern nuclear circumstances. This project is used in the undergraduate capstone class of the Engineering Physics Department at McMaster University to teach students engineering design. This paper discusses the course outline and learning outcomes of the students who took the course over the 2014-2015 academic year. (author)

  15. Computational issues in alternating projection algorithms for fixed-order control design

    DEFF Research Database (Denmark)

    Beran, Eric Bengt; Grigoriadis, K.

    1997-01-01

    Alternating projection algorithms have been introduced recently to solve fixed-order controller design problems described by linear matrix inequalities and non-convex coupling rank constraints. In this work, an extensive numerical experimentation using proposed benchmark fixed-order control design...... examples is used to indicate the computational efficiency of the method. These results indicate that the proposed alternating projections are effective in obtaining low-order controllers for small and medium order problems...

  16. Conceptual design report for tank farm restoration and safe operations, project W-314

    Energy Technology Data Exchange (ETDEWEB)

    Briggs, S.R., Westinghouse Hanford

    1996-05-02

    This Conceptual Design Report (CDR) presents the conceptual level design approach that satisfies the established technical requirements for Project W-314, `Tank Farm Restoration and Safe Operations.` The CDR also addresses the initial cost and schedule baselines for performing the proposed Tank Farm infrastructure upgrades. The scope of this project includes capital improvements to Hanford`s existing tank farm facilities(primarily focused on Double- Shell Tank Farms) in the areas of instrumentation/control, tank ventilation, waste transfer, and electrical systems.

  17. Information Flow Through Stages of Complex Engineering Design Projects: A Dynamic Network Analysis Approach

    DEFF Research Database (Denmark)

    Parraguez, Pedro; Eppinger, Steven D.; Maier, Anja

    2015-01-01

    The pattern of information flow through the network of interdependent design activities is thought to be an important determinant of engineering design process results. A previously unexplored aspect of such patterns relates to the temporal dynamics of information transfer between activities...... design process and thus support theory-building toward the evolution of information flows through systems engineering stages. Implications include guidance on how to analyze and predict information flows as well as better planning of information flows in engineering design projects according...

  18. Design of remote handled process assemblies for the process facility modifications project

    International Nuclear Information System (INIS)

    Smets, J.L.; Ajifu, D.A.

    1987-01-01

    The modular design philosophy for the process facility modification project utilizes an integrated design of components to facilitate operations and maintenance of nuclear fuel reprocessing equipment in a hot cell environment. The utilization of a matrix of remoteable base frames combines with process equipment designed as remote assemblies and sub-assemblies has simplified the overall design. Modularity will allow future flexibility while providing advantages for construction and maintenance in the initial installation

  19. Aerospace Vehicle Design, Spacecraft Section. Final Project Reports. Volume 2; Project Groups 6-8

    Science.gov (United States)

    1989-01-01

    Three groups of student engineers in an aerospace vehicle design course present their designs for a vehicle that can be used to resupply the Space Station Freedam and provide emergency crew return to earth capability. The vehicle's requirements include a lifetime that exceeds six years, low cost, the capability for withstanding pressurization, launch, orbit, and reentry hazards, and reliability. The vehicle's subsystems are structures, communication and command data systems, attitude and articulation control, life support and crew systems, power and propulsion, reentry and recovery systems, and mission management, planning, and costing. Special attention is given to spacecraft communications.

  20. Fuzzy based method for project planning of the infrastructure design for the diagnostic in ITER

    International Nuclear Information System (INIS)

    Piros, Attila; Veres, Gábor

    2013-01-01

    The long-term design projects need special preparation before the start of the execution. This preparation usually includes the drawing of the network diagram for the whole procedure. This diagram includes the time estimation of the individual subtasks and gives us information about the predicted dates of the milestones. The calculated critical path in this network characterizes a specific design project concerning to its duration very well. Several methods are available to support this step of preparation. This paper describes a new method to map the structure of the design process and clarify the milestones and predict the dates of these milestones. The method is based on the PERT (Project Evaluation and Review Technique) network but as a novelty it applies fuzzy logic to find out the concerning times in this graph. With the application of the fuzzy logic the handling of the different kinds of design uncertainties becomes feasible. Many kinds of design uncertainties exist from the possible electric blackout up to the illness of an engineer. In many cases these uncertainties are related with human errors and described with linguistic expressions. The fuzzy logic enables to transform these ambiguous expressions into numeric values for further mathematical evaluation. The method is introduced in the planning of the design project of the infrastructure for the diagnostic systems of ITER. The method not only helps the project in the planning phase, but it will be a powerful tool in mathematical modeling and monitoring of the project execution

  1. Fuzzy based method for project planning of the infrastructure design for the diagnostic in ITER

    Energy Technology Data Exchange (ETDEWEB)

    Piros, Attila, E-mail: attila.piros@gt3.bme.hu [Department of Machine and Product Design, Budapest University of Technology and Economics, Budapest (Hungary); Veres, Gábor [Department of Plasma Physics, Wigner Research Centre for Physics, Hungarian Academy of Sciences, Budapest (Hungary)

    2013-10-15

    The long-term design projects need special preparation before the start of the execution. This preparation usually includes the drawing of the network diagram for the whole procedure. This diagram includes the time estimation of the individual subtasks and gives us information about the predicted dates of the milestones. The calculated critical path in this network characterizes a specific design project concerning to its duration very well. Several methods are available to support this step of preparation. This paper describes a new method to map the structure of the design process and clarify the milestones and predict the dates of these milestones. The method is based on the PERT (Project Evaluation and Review Technique) network but as a novelty it applies fuzzy logic to find out the concerning times in this graph. With the application of the fuzzy logic the handling of the different kinds of design uncertainties becomes feasible. Many kinds of design uncertainties exist from the possible electric blackout up to the illness of an engineer. In many cases these uncertainties are related with human errors and described with linguistic expressions. The fuzzy logic enables to transform these ambiguous expressions into numeric values for further mathematical evaluation. The method is introduced in the planning of the design project of the infrastructure for the diagnostic systems of ITER. The method not only helps the project in the planning phase, but it will be a powerful tool in mathematical modeling and monitoring of the project execution.

  2. Tank SY-102 remediation project: Flowsheet and conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    Yarbro, S.L.; Punjak, W.A.; Schreiber, S.B.; Dunn, S.L.; Jarvinen, G.D.; Marsh, S.F.; Pope, N.G.; Agnew, S.; Birnbaum, E.R.; Thomas, K.W.; Ortic, E.A.

    1994-01-01

    The US Department of Energy established the Tank Waste Remediation System (TWRS) to safely manage and dispose of radioactive waste stored in underground tanks on the Hanford Site. A major program in TWRS is pretreatment which was established to process the waste prior to disposal. Pretreatment is needed to resolve tank safety issues and to separate wastes into high-level and low-level fractions for subsequent immobilization and disposal. There is a fixed inventory of actinides and fission products in the tank which must be prepared for disposal. By segregating the actinides and fission products from the bulk of the waste, the tank`s contents can be effectively managed. Due to the high public visibility and environmental sensitivity of this problem, real progress and demonstrated efforts toward addressing it must begin as soon as possible. As a part of this program, personnel at the Los Alamos National Laboratory (LANL) have developed and demonstrated a flowsheet to remediate tank SY-102 which is located in the 200 West Area and contains high-level radioactive waste. This report documents the results of the flowsheet demonstrations performed with simulated, but radioactive, wastes using an existing glovebox line at the Los Alamos Plutonium Facility. The tank waste was characterized using both a tank history approach and an exhaustive evaluation of the available core sample analyses. This report also presents a conceptual design complete with a working material flow model, a major equipment list, and cost estimates.

  3. The EMIL project at BESSY II: Beamline design and performance

    Energy Technology Data Exchange (ETDEWEB)

    Hendel, Stefan, E-mail: stefan.hendel@helmholtz-berlin.de; Schäfers, Franz; Reichardt, Gerd; Scheer, Michael; Bahrdt, Johannes; Lips, Klaus [Helmholtz-Zentrum Berlin für Materialien und Energie GmbH, Albert-Einstein-Straße 15, 12489 Berlin (Germany); Hävecker, Michael [Helmholtz-Zentrum Berlin für Materialien und Energie GmbH, Albert-Einstein-Straße 15, 12489 Berlin (Germany); MPI for Chemical Energy Conversion, Stiftstrasse 34-36, 45470 Mülheim an der Ruhr (Germany)

    2016-07-27

    The Energy Materials In-Situ Laboratory Berlin (EMIL) at BESSY-II is currently under construction. Two canted undulators for soft- and hard X-rays will be installed into the BESSY II storage ring in one straight section, complex beamlines with more than twenty optical elements will be set up and a new laboratory building attached to BESSY II will host three endstations and a large UHV-transfer system connecting various HV- and UHV-deposition systems. The undulators, UE48 and U17, provide a broad energy spectrum of 80 - 10000 eV, of which the harder radiation (>700 eV) is provided by a cryogenic in-vacuum device. Three monochromators (two plane grating monochromators (PGM) and one LN{sub 2}-cooled double crystal monochromator (DCM)) disperse the radiation into separate pathways of 65 m length, while downstream of the monochromators split-mirror chambers distribute the photon beam to one (or simultaneously to two) of five upcoming endstations. Three of these endstations are designed for the full energy range with spatial overlap of the soft and hard foci, whereas one endstation (PEEM) uses only the soft and another one (PINK) only the hard branch, respectively.

  4. Tank SY-102 remediation project: Flowsheet and conceptual design report

    International Nuclear Information System (INIS)

    Yarbro, S.L.; Punjak, W.A.; Schreiber, S.B.; Dunn, S.L.; Jarvinen, G.D.; Marsh, S.F.; Pope, N.G.; Agnew, S.; Birnbaum, E.R.; Thomas, K.W.; Ortic, E.A.

    1994-01-01

    The US Department of Energy established the Tank Waste Remediation System (TWRS) to safely manage and dispose of radioactive waste stored in underground tanks on the Hanford Site. A major program in TWRS is pretreatment which was established to process the waste prior to disposal. Pretreatment is needed to resolve tank safety issues and to separate wastes into high-level and low-level fractions for subsequent immobilization and disposal. There is a fixed inventory of actinides and fission products in the tank which must be prepared for disposal. By segregating the actinides and fission products from the bulk of the waste, the tank's contents can be effectively managed. Due to the high public visibility and environmental sensitivity of this problem, real progress and demonstrated efforts toward addressing it must begin as soon as possible. As a part of this program, personnel at the Los Alamos National Laboratory (LANL) have developed and demonstrated a flowsheet to remediate tank SY-102 which is located in the 200 West Area and contains high-level radioactive waste. This report documents the results of the flowsheet demonstrations performed with simulated, but radioactive, wastes using an existing glovebox line at the Los Alamos Plutonium Facility. The tank waste was characterized using both a tank history approach and an exhaustive evaluation of the available core sample analyses. This report also presents a conceptual design complete with a working material flow model, a major equipment list, and cost estimates

  5. Market Design Project. Demand Response Resources in Sweden - a summary

    International Nuclear Information System (INIS)

    Fritz, Peter

    2006-06-01

    An important discussion in later years has been whether the necessary reserves in the electricity market are to be generated through normal market mechanisms, i.e. with the price as the primary controlling parameter, or if it requires a collectively financed capacity reserve and how regulations in such a case should be shaped. The issue is first and foremost a matter of where the line is drawn between that which 'the market' should handle and that which can be assured through regulation. Autumn 2002 Svenska Kraftnaet (the Swedish TSO) presented an investigation to the government in which it was suggested that the capacity balance should primarily be managed through the use of normal pricing mechanisms, but that the state should strengthen responsibility for the nation's capacity balance in the period up until 2008. When approaching an effect loss situation, spot prices and balancing power prices will skyrocket. Today, most people are in agreement that a condition for maintained delivery safety is that normal pricing mechanisms are in place and that consumption actually is affected by high prices. The main reason for this conclusion is that it is very expensive to keep production facilities in reserve for situations that are expected to occur very seldom - it is cheaper to encourage large customers to reduce their consumption. The other reason is that increased price sensitivity creates conditions for a more stable and more predictable pricing development in strained situations. While being aware that a response to increased demand is needed, we see too little of that on the market today. The aim of this project is to present concrete measures that will awaken this slumbering resource. In order to judge how much demand response that can reasonably be expected and if there is any financial gain for customers, electricity suppliers and grid operators; it has been necessary to cast a few predictions about future price peaks. We estimate price peaks in the 3-10 SEK

  6. Designing the Game: How a Project-Based Media Production Program Approaches STEAM Career Readiness for Underrepresented Young Adults

    Science.gov (United States)

    Bass, Kristin M.; Hu Dahl, Ingrid; Panahandeh, Shirin

    2016-12-01

    Numerous studies have indicated a need for a diverse workforce that is more highly educated in STEM and ICT fields, and one that is capable of responding creatively to demands for continual innovation. This paper, in response, chronicles the implementation of the Digital Pathways (DP) program, a two-time ITEST recipient and an ongoing initiative of the Bay Area Video Coalition. DP has provided low-income, underrepresented minority young people with 180 contact hours of activities in digital media production to prepare them to pursue higher education and technology careers. A design-based research approach synthesizes staff interviews with student observations, interviews and artifacts to identify a set of generalizable best practices or design principles for empowering young people to move from being consumers of digital media to producers. These principles are illustrated with a case study of the 3D Animation and Gaming track from the second ITEST grant. Researchers argue for the importance of attending to the noncognitive elements of learning and illustrate ways in which instructors encouraged creative expression, personal agency, and collaboration through long-term projects. They also identify strategies for sustaining young people's participation through the establishment of a supportive community environment.

  7. Mental model differences between external designers and their clients : The influence on project exploration, project exploitation and project performance

    NARCIS (Netherlands)

    Tabeau, K.E.; Gemser, G.; Wijnberg, N.; Hultink, H.J.

    2013-01-01

    Prior research indicated that external designers are often hired by their clients to bring new knowledge into their organization. To assure that an external designer’s knowledge is implemented in the organization of the client, managing the relationship between the two is essential. Although it

  8. Design requirements document for Project W-465, immobilized low-activity waste interim storage

    International Nuclear Information System (INIS)

    Burbank, D.A.

    1998-01-01

    The scope of this Design Requirements Document (DRD) is to identify the functions and associated requirements that must be performed to accept, transport, handle, and store immobilized low-activity waste (ILAW) produced by the privatized Tank Waste Remediation System (TWRS) treatment contractors. The functional and performance requirements in this document provide the basis for the conceptual design of the TWRS ILAW Interim Storage facility project and provides traceability from the program level requirements to the project design activity. Technical and programmatic risk associated with the TWRS planning basis are discussed in the Tank Waste Remediation System Decisions and Risk Assessment (Johnson 1994). The design requirements provided in this document will be augmented by additional detailed design data documented by the project

  9. Ethanol Production from Biomass: Large Scale Facility Design Project

    Energy Technology Data Exchange (ETDEWEB)

    Berson, R. Eric [Univ. of Louisville, KY (United States)

    2009-10-29

    High solids processing of biomass slurries provides the following benefits: maximized product concentration in the fermentable sugar stream, reduced water usage, and reduced reactor size. However, high solids processing poses mixing and heat transfer problems above about 15% for pretreated corn stover solids due to their high viscosities. Also, highly viscous slurries require high power consumption in conventional stirred tanks since they must be run at high rotational speeds to maintain proper mixing. An 8 liter scraped surface bio-reactor (SSBR) is employed here that is designed to efficiently handle high solids loadings for enzymatic saccharification of pretreated corn stover (PCS) while maintaining power requirements on the order of low viscous liquids in conventional stirred tanks. Saccharification of biomass exhibit slow reaction rates and incomplete conversion, which may be attributed to enzyme deactivation and loss of activity due to a variety of mechanisms. Enzyme deactivation is classified into two categories here: one, deactivation due to enzyme-substrate interactions and two, deactivation due to all other factors that are grouped together and termed “non-specific” deactivation. A study was conducted to investigate the relative extents of “non-specific” deactivation and deactivation due to “enzyme-substrate interactions” and a model was developed that describes the kinetics of cellulose hydrolysis by considering the observed deactivation effects. Enzyme substrate interactions had a much more significant effect on overall deactivation with a deactivation rate constant about 20X higher than the non-specific deactivation rate constant (0.35 h-1 vs 0.018 h-1). The model is well validated by the experimental data and predicts complete conversion of cellulose within 30 hours in the absence of enzyme substrate interactions.

  10. Staff/bed and staff/patient ratios in South African public sector mental ...

    African Journals Online (AJOL)

    Objectives. To document staff/bed and staff/patient ratios in public. sector mental health services in South Africa. Design. Cross-sectional survey. Method. Aquestionnaire was distributed to provincial mental health co-ordinators requesting numbers of full-time equivalent (FTE) staff who provide mental health care at all ...

  11. SPECIAL REPORT - The KC EMPOWER Project: Designing More Accessible STEM Learning Activities

    Directory of Open Access Journals (Sweden)

    Bob Hirshon

    2016-01-01

    Full Text Available The overall purpose of the Kinetic City (KC Empower project was to examine how informal science activities can be made accessible for students with disabilities. The premise of this project was that all students, including those with disabilities, are interested in and capable of engaging in science learning experiences, if these experiences are accessible to them. Drawing on resources from Kinetic City, a large collection of science experiments, games, and projects developed by the American Association for the Advancement of Science (AAAS, the project researched and adapted five afterschool science activities guided by universal design for learning principles.

  12. The AGP-Project conceptual design for a Spanish HLW final disposal facility

    International Nuclear Information System (INIS)

    Biurrun, E.; Engelmann, H.-J.; Huertas, F.; Ulibarri, A.

    1992-01-01

    Within the framework of the AGP Project a Conceptual Design for a HLW Final Disposal Facility to be eventually built in an underground salt formation in Spain has been developed. The AGP Project has the character of a system analysis. In the current project phase I several alternatives has been considered for different subsystems and/or components of the repository. The system variants, developed to such extent as to allow a comparison of their advantages and disadvantages, will allow the selection of a reference concept, which will be further developed to technical maturity in subsequent project phases. (author)

  13. Design considerations of the World Bank-assisted $55 million photovoltaic market development project in India

    International Nuclear Information System (INIS)

    Cabraal, A.; Bradley, J.

    1993-01-01

    The World Bank's first loan for photovoltaic (PV) power systems was approved on December 17, 1992. The $55-million project will offer concessional financing through the Indian Renewable Energy Development Agency (IREDA) for the purchase of PV systems. The objective of the PV Market Development Project is to encourage the establishment of sustainable product supply, delivery, after-sales service, and financing mechanisms to support marketing PV products on a commercial basis. This paper outlines the issues and steps involved in the project design including: (1) technical viability, (2) financial and economic viability, (3) infrastructure issues, and (4) the economic and financial viability of the project as a whole

  14. Mountaineer Commercial Scale Carbon Capture and Storage Project Topical Report: Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Guy Cerimele

    2011-09-30

    This Preliminary Public Design Report consolidates for public use nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project. The report is based on the preliminary design information developed during the Phase I - Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: (1) DOE's Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; (2) Alstom's Chilled Ammonia Process (CAP) carbon capture retrofit technology and the carbon storage and monitoring system; (3) AEP's retrofit approach in terms of plant operational and integration philosophy; (4) The process island equipment and balance of plant systems for the CAP technology; (5) The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; (6) Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and (7) AEP's decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.

  15. Facilitating Client Value Creation in the Conceptual Design Phase of Construction Projects

    DEFF Research Database (Denmark)

    Thyssen, Mikael Hygum; Emmitt, Stephen; Bonke, Sten

    2009-01-01

    If client values are not fully understood in a construction project it is likely to result in either low fulfilment of client expectations or multiple design alterations during the project process which lead to additional costs and frustration among the project participants. However...... by the fact that the delivery team, which is responsible for understanding and delivering client value, is made up of even more different parties. The paper reports the initial outcome of a joint research project between academics and practitioners, which aims to develop a practical workshop model...... that incorporates client values into the conceptual design of construction projects. The workshop model draws on value management and lean thinking as underlying principles in an attempt to address the ambiguous concept of ‘value’....

  16. A Case Study of User-Centred Design in Four Swiss RUP Projects

    Directory of Open Access Journals (Sweden)

    Ljiljana Vukelja

    2010-01-01

    Full Text Available We analysed four Rational Unified Process (RUP projects in Switzerland that identified themselves as following a user-centred approach. Grounded theory served for analysis of 12 interviews with software developers, project managers, and UI specialists. For each professional group we analysed their work context, motivations, work practices, and strategies used to overcome the obstacles to user-centred design. Results show that end users did not participate in the projects. Instead of working directly with end users, participants used data from marketing research or consulted colleagues from other departments. Prototypes played an important role. We suggest the following remedies: (1 developing methods for easy integration of existing company knowledge about products with usability features, (2 professionalising UI design by educating project stakeholders in standard UI design, (3 creating an approved pool of company's personas for UI specialists' work, and (4 educating customers on their right to get good user interfaces.

  17. CTEPP STANDARD OPERATING PROCEDURE FOR CONDUCTING STAFF AND PARTICIPANT TRAINING (SOP-2.27)

    Science.gov (United States)

    This SOP describes the method to train project staff and participants to collect various field samples and questionnaire data for the study. The training plan consists of two separate components: project staff training and participant training. Before project activities begin,...

  18. Design review report: 200 East upgrades for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's 200 East (200E) Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314 is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farm waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first design package (AN Valve Pit Upgrades) was completed in November 1997, and the associated design verification activities are documented in HNF-1893. The second design package, 200 East (200E) Upgrades, was completed in March 1998. This design package identifies modifications to existing valve pits 241-AX-B and 241-A-B, as well as several new waste transfer pipelines to be constructed within the A Farm Complex of the 200E Area. The scope of the valve pit modifications includes new pit cover blocks, valve

  19. Cam Design Projects in an Advanced CAD Course for Mechanical Engineers

    Science.gov (United States)

    Ault, H. K.

    2009-01-01

    The objective of this paper is to present applications of solid modeling aimed at modeling of complex geometries such as splines and blended surfaces in advanced CAD courses. These projects, in CAD-based Mechanical Engineering courses, are focused on the use of the CAD system to solve design problems for applications in machine design, namely the…

  20. Exploring an innovation project as source of change in organization design

    DEFF Research Database (Denmark)

    Brix, Jacob; Peters, Lois S.

    2015-01-01

    This study builds new empirically based theory on how the processing of an innovation project with a high degree of uncertainty induces change in key components in organization design. By using an embedded case study as our research strategy and organisation design theory as our analytical lens, we...

  1. Solar Collector Design Optimization: A Hands-on Project Case Study

    Science.gov (United States)

    Birnie, Dunbar P., III; Kaz, David M.; Berman, Elena A.

    2012-01-01

    A solar power collector optimization design project has been developed for use in undergraduate classrooms and/or laboratories. The design optimization depends on understanding the current-voltage characteristics of the starting photovoltaic cells as well as how the cell's electrical response changes with increased light illumination. Students…

  2. Making Communication Matter: Integrating Instruction, Projects and Assignments to Teach Writing and Design

    Science.gov (United States)

    Riddell, William T.; Courtney, Jennifer; Constans, Eric; Dahm, Kevin; Harvey, Roberta; von Lockette, Paris

    2010-01-01

    An integrated technical writing and design course has been developed at Rowan University. This course was developed using aspects of project-based learning and recent discussions about design education, as well as pedagogical approaches from the write-to-learn and the writing in the disciplines (WID) movements. The result is a course where the…

  3. Design of the compressor/stretcher ring of the Japanese Hadron Project

    International Nuclear Information System (INIS)

    Ohmori, C.; Noda, A.; Kimiya, Y.; Kihara, M.; Yamane, I.

    1991-01-01

    A possibility of adopting a racetrack-type design for the compressor/stretcher ring of the Japanese Hadron Project is described. This design has two long straight sections to enable to inject the H - beam and to produce a high β point for the slow extraction. (author)

  4. Design of the compressor/stretcher ring of the Japanese Hadron Project

    International Nuclear Information System (INIS)

    Ohmori, C.; Noda, A.; Kamiya, Y.; Kihara, M.; Yamane, I.

    1991-02-01

    A possibility of adopting a racetrack-type design for the compressor/stretcher ring of the Japanese Hadron Project is described. This design has two long straight sections to enable to inject the H - beam and to produce a high β point for the slow extraction. (author)

  5. Smart energy households' pilot projects in the Netherlands with a design-driven approach

    NARCIS (Netherlands)

    Geelen, D.V.; Scheepens, A.; Kobus, C.; Obinna, U.; Mugge, R.; Schoormans, J.; Reinders, Angelina H.M.E.

    2013-01-01

    Residential smart grid projects can be evaluated by a design-driven approach, which focuses on gaining insights for successful product and service development by taking the end-users as a starting point. Because only little experience exists with this design-driven approach, this paper addresses how

  6. Case Study of a Project-Based Learning Course in Civil Engineering Design

    Science.gov (United States)

    Gavin, K.

    2011-01-01

    This paper describes the use of project-based learning to teach design skills to civil engineering students at University College Dublin (UCD). The paper first considers the development of problem-based leaning (PBL) as a tool in higher education. The general issues to be considered in the design of the curriculum for a PBL module are reviewed.…

  7. 34 CFR 637.41 - What are the cost restrictions on design project grants?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What are the cost restrictions on design project grants...) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Conditions Must be Met by a Grantee? § 637.41 What are the cost restrictions on design...

  8. SolarOil Project, Phase I preliminary design report. [Solar Thermal Enhanced Oil Recovery project

    Energy Technology Data Exchange (ETDEWEB)

    Baccaglini, G.; Bass, J.; Neill, J.; Nicolayeff, V.; Openshaw, F.

    1980-03-01

    The preliminary design of the Solar Thermal Enhanced Oil Recovery (SolarOil) Plant is described in this document. This plant is designed to demonstrate that using solar thermal energy is technically feasible and economically viable in enhanced oil recovery (EOR). The SolarOil Plant uses the fixed mirror solar concentrator (FMSC) to heat high thermal capacity oil (MCS-2046) to 322/sup 0/C (611/sup 0/F). The hot fluid is pumped from a hot oil storage tank (20 min capacity) through a once-through steam generator which produces 4.8 MPa (700 psi) steam at 80% quality. The plant net output, averaged over 24 hr/day for 365 days/yr, is equivalent to that of a 2.4 MW (8.33 x 10/sup 6/ Btu/hr) oil-fired steam generator having an 86% availability. The net plant efficiency is 57.3% at equinox noon, a 30%/yr average. The plant will be demonstrated at an oilfield site near Oildale, California.

  9. Supplmental design requirements document enhanced radioactive and mixed waste storage: Phase 5, Project W-113

    International Nuclear Information System (INIS)

    Ocampo, V.P.

    1994-11-01

    This Supplemental Design Requirements Document (SDRD) is used to communicate Project W-113 specific plant design information from Westinghouse Hanford Company (WHC) to the United States Department of Energy (DOE) and the cognizant Architect Engineer (A/E). The SDRD is prepared after the completion of the project Conceptual Design report (CDR) and prior to the initiation of definitive design. Information in the SDRD serves two purposes: to convey design requirements that are too detailed for inclusion in the Functional Design Criteria (FDC) report and to serve as a means of change control for design commitments in the Title I and Title II design. The Solid Waste Retrieval Project (W-113) SDRD has been restructured from the equipment based outline used in previous SDRDs to a functional systems outline. This was done to facilitate identification of deficiencies in the information provided in the initial draft SDRD and aid design confirmation. The format and content of this SDRD adhere as closely as practicable to the requirements of WHC-CM-6-1, Standard Engineering Practices for Functional Design Criteria

  10. Design requirements document for project W-520, immobilized low-activity waste disposal

    International Nuclear Information System (INIS)

    Ashworth, S.C.

    1998-01-01

    This design requirements document (DRD) identifies the functions that must be performed to accept, handle, and dispose of the immobilized low-activity waste (ILAW) produced by the Tank Waste Remediation System (TWRS) private treatment contractors and close the facility. It identifies the requirements that are associated with those functions and that must be met. The functional and performance requirements in this document provide the basis for the conceptual design of the Tank Waste Remediation System Immobilized Low-Activity Waste disposal facility project (W-520) and provides traceability from the program-level requirements to the project design activity

  11. Design requirements document for project W-520, immobilized low-activity waste disposal

    Energy Technology Data Exchange (ETDEWEB)

    Ashworth, S.C.

    1998-08-06

    This design requirements document (DRD) identifies the functions that must be performed to accept, handle, and dispose of the immobilized low-activity waste (ILAW) produced by the Tank Waste Remediation System (TWRS) private treatment contractors and close the facility. It identifies the requirements that are associated with those functions and that must be met. The functional and performance requirements in this document provide the basis for the conceptual design of the Tank Waste Remediation System Immobilized Low-Activity Waste disposal facility project (W-520) and provides traceability from the program-level requirements to the project design activity.

  12. Exploring the dynamics of ownership in community-oriented design projects

    DEFF Research Database (Denmark)

    Light, Ann; Hansen, Nicolai Brodersen; Halskov, Kim

    2013-01-01

    This paper contributes an exploration of ownership as a dynamic process in community-oriented projects. We use case study accounts of two design projects to consider participation in contexts where social structure is relevant to design outcomes. In studying these dynamics, we consider four aspec...... community groups in making internet radio podcasts to share insight. We examine the complexity of the social process involved and trace patterns of change, before concluding with pragmatic and ethical reasons for technology design to pay attention to ownership issues....

  13. Digital VLSI systems design a design manual for implementation of projects on FPGAs and ASICs using Verilog

    CERN Document Server

    Ramachandran, S

    2007-01-01

    Digital VLSI Systems Design is written for an advanced level course using Verilog and is meant for undergraduates, graduates and research scholars of Electrical, Electronics, Embedded Systems, Computer Engineering and interdisciplinary departments such as Bio Medical, Mechanical, Information Technology, Physics, etc. It serves as a reference design manual for practicing engineers and researchers as well. Diligent freelance readers and consultants may also start using this book with ease. The book presents new material and theory as well as synthesis of recent work with complete Project Designs

  14. Development of a Refined Staff Group Trainer

    National Research Council Canada - National Science Library

    Quensel, Susan

    1999-01-01

    .... As a follow-on effort to the previous SGT project, the goal was to refine a brigade-level staff training program to more effectively and efficiently coordinate the activities within and between the...

  15. 10 CFR 2.709 - Discovery against NRC staff.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Discovery against NRC staff. 2.709 Section 2.709 Energy... Rules for Formal Adjudications § 2.709 Discovery against NRC staff. (a)(1) In a proceeding in which the NRC staff is a party, the NRC staff will make available one or more witnesses, designated by the...

  16. 18 CFR 388.104 - Informal advice from Commission staff.

    Science.gov (United States)

    2010-04-01

    ... Commission staff. 388.104 Section 388.104 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... Commission staff. (a) The Commission staff provides informal advice and assistance to the general public and... expressed by the staff do not represent the official views of the Commission, but are designed to aid the...

  17. Project W-236A, work plan for preparation of a design requirements document

    International Nuclear Information System (INIS)

    Groth, B.D.

    1995-01-01

    This work plan outlines the tasks necessary, and defines the organizational responsibilities for preparing a Design Requirements Document (DRD) for project W-236A, Multi-Function Waste Tank Facility (MWTF). A DRD is a Systems Engineering document which bounds, at a high level, the requirements of a discrete system element of the Tank Waste Remediation System (TWRS) Program. This system element is usually assigned to a specific project, in this case the MWTF. The DRD is the document that connects the TWRS program requirements with the highest level projects requirements and provides the project's link to the overall TWRS mission. The MWTF DRD effort is somewhat unique in that the project is already in detailed design, whereas a DRO is normally prepared prior to preliminary design. The MWTF design effort was initiated with a Functional Design Criteria (FDC) and a Supplemental Design Requirements Document (SDRD) bounding the high level requirements. Another unique aspect of this effort is that some of the TWRS program requirements are still in development. Because of these unique aspects of the MWTF DRD development, the MWTF will be developed from existing TWRS Program requirements and project specific requirements contained in the FDC and SDRD. The following list describes the objectives of the MWTF DRD: determine the primary functions of the tanks through a functional decomposition of the TWRS Program high level functions; allocate the primary functions to a sub-system architecture for the tanks; define the fundamental design features in terms of performance requirements for the system and subsystems; identify system interfaces and design constraints; and document the results in a DRD

  18. Nuclear design aspect of the Korean high intensity proton accelerator project

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Jonghwa; Song, Tae-Yung [Korea Atomic Energy Research Inst., Yusong, Taejon (Korea, Republic of)

    1998-11-01

    A plan to construct a high current proton accelerator has been proposed by KAERI. We are presenting the required nuclear design to support the project as well as a brief overview of the proposed proton accelerator. The target and core design is highlighted to show feasibility of incineration of minor actinides from the spent fuel of light water reactors. Radiation shielding and activation analyses are also important for the design and the license of the accelerator. (author)

  19. The research and development of module 3D designing system for nuclear power project based on the PDMS

    International Nuclear Information System (INIS)

    Lu Qinwu; Li Yi; Wu Xiangyong

    2012-01-01

    In order to meet the demand of implementing Modularization design in CPR1000 nuclear power projects, this study aims to develop, relying on CPR1000 nuclear power project, the self-reliant module 3D design system based on the PDMS. so as to offer a convenient and effective module 3D design tool for the designers. Satisfactory results have been achieved through the test and application of two design projects. The research and application have entered the domestic advanced level. (authors)

  20. Design and development of an intelligent nursing bed - a pilot project of "joint assignment".

    Science.gov (United States)

    Jiehui Jiang; Tingwei Liu; Yuting Zhang; Yu Song; Mi Zhou; Xiaosong Zheng; Zhuangzhi Yan

    2017-07-01

    The "joint assignment" is a creative bachelor education project for Biomedical Engineering (BME) in Shanghai University (SHU), China. The objective of this project is to improve students' capabilities in design thinking and teamwork through practices in the process of the design and development of complex medical product. As the first step, a pilot project "design and development of intelligent nursing bed" was set up in May 2015. This paper describes details of how project organization and management, various teaching methods and scientific evaluation approaches were achieved in this pilot project. For example, a method containing one main line and four branches is taken to manage the project and "prototyping model" was used as the main research approach. As a result a multi-win situation was achieved. The results showed, firstly, 62 bachelor students including 16 BME students were well trained. They improved themselves in use of practical tools, communication skills and scientific writing; Secondly, commercial companies received a nice product design on intelligent nursing bed, and have been working on industrializing it; Thirdly, the university and associated schools obtained an excellent practical education experience to supplement traditional class education; Fourthly and most importantly, requirements from end-users will be met. The results also showed that the "joint assignment" task could become a significant component in BME bachelor education.

  1. Application of Deterministic and Probabilistic System Design Methods and Enhancements of Conceptual Design Tools for ERA Project

    Science.gov (United States)

    Mavris, Dimitri N.; Schutte, Jeff S.

    2016-01-01

    This report documents work done by the Aerospace Systems Design Lab (ASDL) at the Georgia Institute of Technology, Daniel Guggenheim School of Aerospace Engineering for the National Aeronautics and Space Administration, Aeronautics Research Mission Directorate, Integrated System Research Program, Environmentally Responsible Aviation (ERA) Project. This report was prepared under contract NNL12AA12C, "Application of Deterministic and Probabilistic System Design Methods and Enhancement of Conceptual Design Tools for ERA Project". The research within this report addressed the Environmentally Responsible Aviation (ERA) project goal stated in the NRA solicitation "to advance vehicle concepts and technologies that can simultaneously reduce fuel burn, noise, and emissions." To identify technology and vehicle solutions that simultaneously meet these three metrics requires the use of system-level analysis with the appropriate level of fidelity to quantify feasibility, benefits and degradations, and associated risk. In order to perform the system level analysis, the Environmental Design Space (EDS) [Kirby 2008, Schutte 2012a] environment developed by ASDL was used to model both conventional and unconventional configurations as well as to assess technologies from the ERA and N+2 timeframe portfolios. A well-established system design approach was used to perform aircraft conceptual design studies, including technology trade studies to identify technology portfolios capable of accomplishing the ERA project goal and to obtain accurate tradeoffs between performance, noise, and emissions. The ERA goal, shown in Figure 1, is to simultaneously achieve the N+2 benefits of a cumulative noise margin of 42 EPNdB relative to stage 4, a 75 percent reduction in LTO NOx emissions relative to CAEP 6 and a 50 percent reduction in fuel burn relative to the 2005 best in class aircraft. There were 5 research task associated with this research: 1) identify technology collectors, 2) model

  2. Human-Centred Design Workshops in Collaborative Strategic Design Projects: An Educational and Professional Comparison

    Science.gov (United States)

    Liem, Andre; Sanders, Elizabeth B.-N.

    2013-01-01

    It has been found that the implementation of Human-centred Design (HCD) methods in the Fuzzy Front-End is not likely to lead to diversification in educational product planning exercises, where time lines are short and executors lack experience. Companies, interested to collaborate with Master-level Industrial Design students on strategic design…

  3. Using Vector Projection Method to evaluate maintainability of mechanical system in design review

    International Nuclear Information System (INIS)

    Chen Lu; Cai Jianguo

    2003-01-01

    Maintainability of a mechanical system is one of the system design parameters that has a great impact in terms of ease of maintenance. In this article, based on the definition of the terms of maintenance and maintainability, an important tool of Design for Maintenance is developed as a way to improve maintainability through design. A set of standard and organized guidelines is provided and maintainability factors in terms of physical design, logistics support and ergonomics are identified. As a specific application of design review, a methodology so called Vector Projection Method is developed to evaluate the maintainability of the mechanical system. Lastly, an example is discussed

  4. Optimized design for the scattering with angular limitation in projection electron-beam lithography based electron projection system

    International Nuclear Information System (INIS)

    Xiu, K.; Gibson, J. M.

    2000-01-01

    We investigate the design for a scattering with angular limitation in projection electron-beam lithography (SCALPEL) based electron projection system with a demagnification of -4. By a ''field-flip'' process we can construct a doublet in which the magnetic field has a flat feature in most of the optic column but opposite sign at two sides connected by a sharp transition region. Such a theoretical model can give a near zero chromatic aberration of rotation and much smaller field curvature and astigmatism. Compared with the conventional doublet, the total image blur caused by aberrations at 1/√(2) mm off-axis distance and 1.5 mrad semiangle aperture at the mask side is about only 24 nm for a column length of 400 mm. A shorter column, less than the current 400 mm, is also favored for further reducing the total aberration. These guarantee that we can choose a much larger aperture angle (compared with present 0.5 mrad) and beam current density in such a SCALPEL projection system to achieve higher throughput while still maintaining current resolution. A practical issue for possible magnetic lens design is also discussed. (c) 2000 American Vacuum Society

  5. A web-based online collaboration platform for formulating engineering design projects

    Science.gov (United States)

    Varikuti, Sainath

    Effective communication and collaboration among students, faculty and industrial sponsors play a vital role while formulating and solving engineering design projects. With the advent in the web technology, online platforms and systems have been proposed to facilitate interactions and collaboration among different stakeholders in the context of senior design projects. However, there are noticeable gaps in the literature with respect to understanding the effects of online collaboration platforms for formulating engineering design projects. Most of the existing literature is focused on exploring the utility of online platforms on activities after the problem is defined and teams are formed. Also, there is a lack of mechanisms and tools to guide the project formation phase in senior design projects, which makes it challenging for students and faculty to collaboratively develop and refine project ideas and to establish appropriate teams. In this thesis a web-based online collaboration platform is designed and implemented to share, discuss and obtain feedback on project ideas and to facilitate collaboration among students and faculty prior to the start of the semester. The goal of this thesis is to understand the impact of an online collaboration platform for formulating engineering design projects, and how a web-based online collaboration platform affects the amount of interactions among stakeholders during the early phases of design process. A survey measuring the amount of interactions among students and faculty is administered. Initial findings show a marked improvement in the students' ability to share project ideas and form teams with other students and faculty. Students found the online platform simple to use. The suggestions for improving the tool generally included features that were not necessarily design specific, indicating that the underlying concept of this collaborative platform provides a strong basis and can be extended for future online platforms

  6. Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project

    International Nuclear Information System (INIS)

    Duckwitz, Noel

    2011-01-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets,' safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, 'Facility Safety,' and the expectations of DOE-STD-1189-2008, 'Integration of Safety into the Design Process,' provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  7. Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project

    International Nuclear Information System (INIS)

    Duckwitz, Noel

    2011-01-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets,' safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, 'Facility Safety,' and the expectations of DOE-STD-1189-2008, 'Integration of Safety into the Design Process,' provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  8. Waste handling building design tradeoff studies: Salt Repository Project closeout task report

    International Nuclear Information System (INIS)

    1988-01-01

    The purpose of this closeout study is to capture work done by SRPO contractors and the relevant knowledge and recommendations of Battelle staff regarding design of WHB receiving, storage, hot cell areas, and process logistics. The information and recommendations are based on the latest available studies and prior experience of Battelle personnel at WIPP, INEL, and Hanford facilities. The information is expected to be directly applicable to WHB design work that will be done at Nevada, MRS, or other repository facilities. A perspective showing the various WHB areas and general arrangement is given. This study addresses alternatives associated with the receiving area, the fuel storage areas, the cell arrangements, the failed fuel accommodations, and the process logistics. 16 refs., 2 figs., 5 tabs

  9. Research Staff | Buildings | NREL

    Science.gov (United States)

    Research Staff Research Staff Photo of Roderick Jackson Roderick Jackson Laboratory Program Manager -related research at NREL. He works closely with senior laboratory management to set the strategic agenda for NREL's buildings portfolio, including all research, development, and market implementation

  10. E3 Staff Database

    Data.gov (United States)

    US Agency for International Development — E3 Staff database is maintained by E3 PDMS (Professional Development & Management Services) office. The database is Mysql. It is manually updated by E3 staff as...

  11. Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Saurwein, John

    2011-07-15

    This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

  12. Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

    International Nuclear Information System (INIS)

    Saurwein, J.

    2011-01-01

    This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

  13. Research and Development Projects with ICT and students as learning designers in Primary Schools

    DEFF Research Database (Denmark)

    Levinsen, Karin; Sørensen, Birgitte Holm; Tosca, Susana

    2014-01-01

    In this paper we present some methodological challenges that emerged during the process of shaping the research design for the comprehensive and complex research project Children as learning designers in a digital school. The project is the realization of our proposal to a research call from...... to the need to strengthen the populations’ digital literacy and 21st century competencies. The call’s scope was research and development projects as pilot school experiments in relation to five selected areas. The selected projects should contribute with new generalizable and practice oriented knowledge...... of how: • ICT supports students learning, • ICT release time for more teaching, and • teachers digital literacy impact on the role of ICT in the educational practice. Further the call required collaboration between universities and university colleges in order to disseminate knowledge and new practices...

  14. Onondaga Lake Inner Harbor Dredging Design Project, Syracuse, New York: Final Design Memorandum

    National Research Council Canada - National Science Library

    1997-01-01

    .... The sponsor is the New York State Canal Corporation. The design includes deepening the Inner Harbor channel and a portion of the terminal slip area to a depth of 10 feet below Low Water Datum (LWD...

  15. Radiation monitoring of PET staff

    International Nuclear Information System (INIS)

    Trang, A.

    2004-01-01

    Full text: Positron emission tomography (PET) is becoming a common diagnostic tool in hospitals, often located in and employing staff from the Nuclear Medicine or Radiology departments. Although similar in some ways, staff in PET departments are commonly found to have the highest radiation doses in the hospital environment due to unique challenges which PET tracers present in administration as well as production. The establishment of a PET centre with a dedicated cyclotron has raised concerns of radiation protection to the staff at the WA PET Centre and the Radiopharmaceutical Production and Development (RAPID) team. Since every PET centre has differing designs and practices, it was considered important to closely monitor the radiation dose to our staff so that improvements to practices and design could be made to reduce radiation dose. Electronic dosimeters (MGP DMC 2000XB), which have a facility to log time and dose at 10 second intervals, were provided to three PET technologists and three PET nurses. These were worn in the top pocket of their lab coats throughout a whole day. Each staff member was then asked to note down their duties throughout the day and also note the time they performed each duty. The duties would then correlate with the dose with which the electronic monitor recorded and an estimate of radiation dose per duty could be given. Also an estimate of the dose per day to each staff member could be made. PET nurses averaged approximately 20 μ8v per day getting their largest dose from caring for occasional problematic patients. Smaller doses of a 1-2 μ8v were recorded for injections and removing cannulas. PET technologists averaged approximately 15 μ8v per day getting their largest dose of 1-5μ8v mainly from positioning of patients and sometimes larger doses due to problematic patients. Smaller doses of 1-2 μ5v were again recorded for injections and removal of cannulas. Following a presentation given to staff, all WA PET Centre and RAPID staff

  16. Biotechnology by Design: An Introductory Level, Project-Based, Synthetic Biology Laboratory Program for Undergraduate Students†

    OpenAIRE

    Beach, Dale L.; Alvarez, Consuelo J.

    2015-01-01

    Synthetic biology offers an ideal opportunity to promote undergraduate laboratory courses with research-style projects, immersing students in an inquiry-based program that enhances the experience of the scientific process. We designed a semester-long, project-based laboratory curriculum using synthetic biology principles to develop a novel sensory device. Students develop subject matter knowledge of molecular genetics and practical skills relevant to molecular biology, recombinant DNA techniq...

  17. Energy Efficiency Performance in Refurbishment Projects with Design Team Attributes As A Mediator: A Pilot Study

    Science.gov (United States)

    Sekak, Siti Nor Azniza Ahmad; Rahmat Dr, Ismail, Prof.; Yunus, Julitta; Saád, Sri Rahayu Mohd; Hanafi Azman Ong, Mohd

    2017-12-01

    The Energy Efficiency (EE) plays an important role over the building life cycle and the implementation of EE in refurbishment projects has a significant potential towards the reduction of greenhouse gas emissions. However, the involvement of the design team at the early stage of the refurbishment projects will determine the success of EE implementations. Thus, a pilot study was conducted at the initial stage of the data collection process of this research to validate and verify the questionnaires.

  18. Design and testing of a perimeter of increment threshold by projection

    OpenAIRE

    García Domene, María del Carmen; Luque Cobija, María José; Fez Saiz, Dolores de

    2017-01-01

    In the present study, we have designed and tested a perimeter for the detection of damage in the chromatic mechanisms using a video projector. To this purpose, we have characterized pixel to pixel a video projector, to account for the inhomogeneities in the projection. We have measured the tristimulus values of the projector primaries as a function of digital level, at 49 locations of the projection screen and, from them, we have arrived to a characterization model which reduces the color dif...

  19. A nationwide quality improvement project to accelerate Ghana's progress toward Millennium Development Goal Four: design and implementation progress.

    Science.gov (United States)

    Twum-Danso, Nana A Y; Akanlu, George B; Osafo, Enoch; Sodzi-Tettey, Sodzi; Boadu, Richard O; Atinbire, Solomon; Adondiwo, Ane; Amenga-Etego, Isaac; Ashagbley, Francis; Boadu, Eric A; Dasoberi, Ireneous; Kanyoke, Ernest; Yabang, Elma; Essegbey, Ivan T; Adjei, George A; Buckle, Gilbert B; Awoonor-Williams, J Koku; Nang-Beifubah, Alexis; Twumasi, Akwasi; McCannon, C Joseph; Barker, Pierre M

    2012-12-01

    The gap between evidence-based guidelines and practice of care is reflected, in low- and middle-income countries, by high rates of maternal and child mortality and limited effectiveness of large-scale programing to decrease those rates. We designed a phased, rapid, national scale-up quality improvement (QI) intervention to accelerate the achievement of Millennium Development Goal Four in Ghana. Our intervention promoted systems thinking, active participation of managers and frontline providers, generation and testing of local change ideas using iterative learning from transparent district and local data, local ownership and sustainability. After 50 months of implementation, we have completed two prototype learning phases and have begun regional spread phases to all health facilities in all 38 districts of the three northernmost regions and all 29 Catholic hospitals in the remaining regions of the country. To accelerate the spread of improvement, we developed 'change packages' of rigorously tested process changes along the continuum of care from pregnancy to age 5 in both inpatient and outpatient settings. The primary successes for the project so far include broad and deep adoption of QI by local stakeholders for improving system performance, widespread capacitation of leaders, managers and frontline providers in QI methods, incorporation of local ideas into change packages and successful scale-up to approximately 25% of the country's districts in 3 years. Implementation challenges include variable leadership uptake and commitment at the district level, delays due to recruiting and scheduling barriers, weak data systems and repeated QI training due to high staff turnover.

  20. The Iodine Satellite (iSat) Project Development Towards Critical Design Review

    Science.gov (United States)

    Dankanich, John W.; Calvert, Derek; Kamhawi, Hani; Hickman, Tyler; Szabo, James; Byrne, Lawrence

    2015-01-01

    Despite the prevalence of small satellites in recent years, the systems flown to date have very limited propulsion capability. SmallSats are typically secondary payloads and have significant constraints for volume, mass, and power in addition to limitations on the use of hazardous propellants or stored energy. These constraints limit the options for SmallSat maneuverability. NASA's Space Technology Mission Directorate approved the iodine Satellite flight project for a rapid demonstration of iodine Hall thruster technology in a 12U (cubesat units) configuration under the Small Spacecraft Technology Program. The mission is a partnership between NASA MSFC, NASA GRC, and Busek Co, Inc., with the Air Force supporting the propulsion technology maturation. The team is working towards the critical design review in the final design and fabrication phase of the project. The current design shows positive technical performance margins in all areas. The iSat project is planned for launch readiness in the spring of 2017.

  1. Research Staff | Wind | NREL

    Science.gov (United States)

    Research Staff Research Staff Learn more about the expertise and technical skills of the wind power research team and staff at NREL. Name Position Email Phone Anstedt, Sheri Professional III-Writer/Editor /Web Content Sheri.Anstedt@nrel.gov 303-275-3255 Baker, Donald Research Technician V-Electrical

  2. CBE Faculty and Staff

    Science.gov (United States)

    About Us Research Staff Edward Arens Fred Bauman Gail Brager Darryl Dickerhoff Ali Ghahramani Partners Facilities Graduate Programs Visiting Scholar Program Careers CBE Faculty and Staff CBE is an performance of buildings. The core research group for CBE includes faculty and research staff members

  3. Visuals Matter! Designing and using effective visual representations to support project and portfolio decisions

    DEFF Research Database (Denmark)

    Geraldi, Joana; Arlt, Mario

    . They can help managers to be sharper and quicker, especially if visuals are used in a mindful manner. The intent of this book is to increase the awareness of project, program and portfolio practitioners and scholars about the importance of visuals and to provide practical recommendations on how they can......This book is the result of a two-year research project, funded by Project Management Institute and University College London on data visualization in the project and portfolio management contexts. Visuals are powerful and constitute an integral part of analyzing problems and making decisions...... be used and designed mindfully. The research, which underpins this book, focuses on the impact of visuals on cognition of data in project portfolio decisions. The complexity of portfolio problems often exceed human cognitive limitations as a result of a number of factors, such as the large number...

  4. Experimental and theoretical analysis for improved microscope design of optical projection tomographic microscopy.

    Science.gov (United States)

    Coe, Ryan L; Seibel, Eric J

    2013-09-01

    We present theoretical and experimental results of axial displacement of objects relative to a fixed condenser focal plane (FP) in optical projection tomographic microscopy (OPTM). OPTM produces three-dimensional, reconstructed images of single cells from two-dimensional projections. The cell rotates in a microcapillary to acquire projections from different perspectives where the objective FP is scanned through the cell while the condenser FP remains fixed at the center of the microcapillary. This work uses a combination of experimental and theoretical methods to improve the OPTM instrument design.

  5. A feeling for Systems Development Work - Design of the ROSA project

    DEFF Research Database (Denmark)

    Bødker, Susanne; Greenbaum, Joan

    1988-01-01

    This article is based on the design of a research project that will look at intuition, learning processes, language and roles in the development of computer systems. The research project, called ROSA (a Danish acronym for Roles and Cooperation in Systems Development) grew out of our interest...... in the informal working practices among systems developers, because it is these informal working relationships that are most often overlooked in research about computer science methods and tools. The project applies a gender perspective to look at the informal work relations of systems developers. The concept...

  6. Avaliação de projeto político-pedagógico pelos funcionários: espaços e representatividade Evaluation of a political-pedagogical project by the university staff: spaces and representativeness

    Directory of Open Access Journals (Sweden)

    Jorge Luís Moreira Alberto

    2008-11-01

    Full Text Available Os estudos, de diferentes vertentes e enfoques, afirmam que o processo de educação escolarizada não se reduz à sala de aula e se viabiliza pela ação articulada entre todos os agentes educativos. Preocupando-nos com o baixo protagonismo dos funcionários (corpo técnico-administrativo na construção do projeto político-pedagógico e levando em conta o fato de que os debates não têm enfocado regiões periféricas do processo pedagógico, o presente texto é parte de uma pesquisa mais ampla, de natureza quali-quantitativa, no campo da avaliação institucional, e tem como objeto de reflexão o espaço do Projeto Político-Pedagógico de uma Universidade e suas Unidades Acadêmicas, a partir da representatividade e avaliação desse Projeto pelos funcionários.Research based on different purposes and focuses suggest that the formal education process cannot be reduced to the classroom environment and must also take place through articulated action between all educational participants. Concerned with the low level of participation of staff members in the elaboration of a political-pedagogical project and taking into account the fact that discussions have not focused on peripheral aspects of the pedagogical process, this paper was originated from a broader quali-quantitative research in the field of institutional evaluation and aims at reflecting about the space of the Political-Pedagogical Project in a University and its Academic Units, based on the representation and evaluation of this Project by the staff.

  7. Design and Flood Control Assessment of 5MWp Fishing and Photovoltaic Power Project in Xinghua City

    Science.gov (United States)

    Guo, Liuchao; Hu, Xiaodong; Su, Yuyan; Wu, Peipei; Weng, Songgan

    2017-12-01

    In order to reduce coal consumption in Jiangsu Province and develop new energy sources, considering on the distribution of geology, solar energy resources, traffic and grid connection in Xinghua City, the aim is to determine the configuration of photovoltaic modules and photovoltaic array tracking mode, design photovoltaic array and layout scheme. But the project is a wading project, it is built in Dong Tan Lake polder I115, it needs scientific and reasonable evaluation to the effect of Dong Tan Lake’s flood storage and discharge. The results can provide guidance for similar engineering’s design.

  8. Conceptual design report, plutonium stabilization and handling,project W-460

    Energy Technology Data Exchange (ETDEWEB)

    Weiss, E.V.

    1997-03-06

    Project W-460, Plutonium Stabilization and Handling, encompasses procurement and installation of a Stabilization and Packaging System (SPS) to oxidize and package for long term storage remaining plutonium-bearing special nuclear materials currently in inventory at the Plutonium Finishing Plant (PFP), and modification of vault equipment to allow storage of resulting packages of stabilized SNM for up to fifty years. This Conceptual Design Report (CDR) provides conceptual design details for the vault modification, site preparation and site interface with the purchased SPS. Two concepts are described for vault configuration; acceleration of this phase of the project did not allow completion of analysis which would clearly identify a preferred approach.

  9. Project Lifespan-based Nonstationary Hydrologic Design Methods for Changing Environment

    Science.gov (United States)

    Xiong, L.

    2017-12-01

    Under changing environment, we must associate design floods with the design life period of projects to ensure the hydrologic design is really relevant to the operation of the hydrologic projects, because the design value for a given exceedance probability over the project life period would be significantly different from that over other time periods of the same length due to the nonstationarity of probability distributions. Several hydrologic design methods that take the design life period of projects into account have been proposed in recent years, i.e. the expected number of exceedances (ENE), design life level (DLL), equivalent reliability (ER), and average design life level (ADLL). Among the four methods to be compared, both the ENE and ER methods are return period-based methods, while DLL and ADLL are risk/reliability- based methods which estimate design values for given probability values of risk or reliability. However, the four methods can be unified together under a general framework through a relationship transforming the so-called representative reliability (RRE) into the return period, i.e. m=1/1(1-RRE), in which we compute the return period m using the representative reliability RRE.The results of nonstationary design quantiles and associated confidence intervals calculated by ENE, ER and ADLL were very similar, since ENE or ER was a special case or had a similar expression form with respect to ADLL. In particular, the design quantiles calculated by ENE and ADLL were the same when return period was equal to the length of the design life. In addition, DLL can yield similar design values if the relationship between DLL and ER/ADLL return periods is considered. Furthermore, ENE, ER and ADLL had good adaptability to either an increasing or decreasing situation, yielding not too large or too small design quantiles. This is important for applications of nonstationary hydrologic design methods in actual practice because of the concern of choosing the emerging

  10. Rapid product development: project engineering joined to design engineering in a concurrent engineering context

    Science.gov (United States)

    Bernard, Alain; Ouazzani, A.; Chambolle, F.; Bocquet, Jean Claud

    1997-01-01

    Software tools for designers are mainly based on geometry. Today, many industrial modelers have been rebuilt with C++, or any other object oriented language. This paper proposes to locate the research topics, in order to develop a functional link between project management tools, technical data management and product models. The 'design process' aspect will also be justified through the need of capitalizing designer intent and design history. This is related to different research works of Mechanical Engineering and Logistics Laboratory of Ecole Centrale Paris, and especially two PhD topics.

  11. Elections to Staff Council

    CERN Multimedia

    Saff Association

    2013-01-01

    2013 Elections to Staff Council   Vote! Make your voice heard and be many to elect the new Staff Council. More details on the elections can be found on the Staff Association web site (https://ap-vote.web.cern.ch/elections-2013).   Timetable elections Monday 28 October to Monday 11 November, 12:00 am voting Monday 18 and Monday 25 November, publication of the results in Echo Tuesday 19 November, Staff Association Assizes Tuesday 3 December, first meeting of the new Staff Council and election of the new Executive Committee The voting procedure is monitored by the Election Committee.

  12. The Effect of STEM Learning through the Project of Designing Boat Model toward Student STEM Literacy

    Science.gov (United States)

    Tati, T.; Firman, H.; Riandi, R.

    2017-09-01

    STEM Learning focusses on development of STEM-literate society, the research about implementation of STEM learning to develope students’ STEM literacy is still limited. This study is aimed to examine the effect of implementation STEM learning through the project of designing boat model on students STEM literacy in energy topic. The method of this study was a quasi-experiment with non-randomized pretest-posttest control group design. There were two classes involved, the experiment class used Project Based Learning with STEM approach and control class used Project-Based Learning without STEM approach. A STEM Literacy test instrument was developed to measure students STEM literacy which consists of science literacy, mathematics literacy, and technology-engineering literacy. The analysis showed that there were significant differences on improvement science literacy, mathematics technology-engineering between experiment class and control class with effect size more than 0.8 (large effect). The difference of improvement of STEM literacy between experiment class and control class is caused by the existence of design engineering activity which required students to apply the knowledge from every field of STEM. The challenge that was faced in STEM learning through design engineering activity was how to give the students practice to integrate STEM field in solving the problems. In additional, most of the students gave positive response toward implementation of STEM learning through design boat model project.

  13. Magic-Mirror-Spiral: Looking into the role of 'design ideal' in interaction design research projects

    DEFF Research Database (Denmark)

    Bagalkot, Naveen L.; Nazzi, Elena; Sokoler, Tomas

    2011-01-01

    the dialectic during a research practice are missing. In order to embrace this dialectic, in this paper we suggest the formulation of a Design Ideal as the interface between theoretical concept and situation. We support our suggestion by a retrospection of our ongoing exploration of MagicMirrorSpiral...

  14. Towards mobile staff members management

    Science.gov (United States)

    Encheva, Sylvia

    2017-07-01

    Todays project management requires a number of abilities which involve finding quick solutions to shortage of staff members with possession of specific qualities. When persons with team responsibilities are under pressure or due to various circumstances are unable to perform exhaustive search in databases, an interactive visualization tool can come in quite handy in finding good solutions unforeseen occurrences. In particular we propose application of selected graphs for facilitating mobile human resource management.

  15. Life concerns of elderly people living at home determined as by Community General Support Center staff: implications for organizing a more effective integrated community care system. The Kurihara Project.

    Science.gov (United States)

    Takada, Junko; Meguro, Kenichi; Sato, Yuko; Chiba, Yumiko

    2014-09-01

    In Japan, the integrated community care system aims to enable people to continue to live in their homes. Based on the concept, one of the activities of a Community General Support Center (CGSC) is to provide preventive intervention based on a Community Support Program. Currently, a Basic Checklist (BC) is sent to elderly people to identify persons appropriate for a Secondary Prevention Program. To find people who had not responded to the BC, CGSC staff evaluated the files of 592 subjects who had participated in the Kurihara Project to identify activities they cannot do that they did in the past, decreased activity levels at home, loss of interaction with people other than their family, and the need for medical interventions. This information was classified, when applicable, into the following categories: (A) 'no life concerns'; (B) 'undecided'; and (C) 'life concerns'. The relationships between these classifications and clinical information, certified need for long-term care, and items on the BC were examined. The numbers of subjects in categories A, B, and C were 291, 42, and 186, respectively. Life concerns were related to scores on the Clinical Dementia Rating, global cognitive function, depressive state, and apathy. Most items on the BC were not associated with classification into category C, but ≥25% of the subjects had life concerns related to these items. Assessment of life concerns by the CGSC staff has clinical validity. The results suggest that there are people who do not respond to the checklist or apply for Long-Term Care Insurance, meaning that they 'hide' in the community, probably due to apathy or depressive state. To organize a more effective integrated community care system, the CGSC staff should focus mainly on preventive care. © 2014 The Authors. Psychogeriatrics © 2014 Japanese Psychogeriatric Society.

  16. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Science.gov (United States)

    2010-10-01

    ... designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78... Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical... acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  17. Advanced conceptual design report solid waste retrieval facility, phase I, project W-113

    International Nuclear Information System (INIS)

    Smith, K.E.

    1994-01-01

    Project W-113 will provide the equipment and facilities necessary to retrieve suspect transuranic (TRU) waste from Trench 04 of the 218W-4C burial ground. As part of the retrieval process, waste drums will be assayed, overpacked, vented, head-gas sampled, and x-rayed prior to shipment to the Phase V storage facility in preparation for receipt at the Waste Receiving and Processing Facility (WRAP). Advanced Conceptual Design (ACD) studies focused on project items warranting further definition prior to Title I design and areas where the potential for cost savings existed. This ACD Report documents the studies performed during FY93 to optimize the equipment and facilities provided in relation to other SWOC facilities and to provide additional design information for Definitive Design

  18. Training of power station staff

    International Nuclear Information System (INIS)

    Dusserre, J.

    1993-01-01

    ELECTRICITE DE FRANCE currently operates 51 generating stations with 900 and 1300 MW Pressurized Water Reactors while, only 15 years ago, France possessed only a very small number of such stations. It was therefore vital to set up a major training organization to produce staff capable of starting, controlling and maintaining these facilities with a constant eye to improving quality and safety. Operator and maintenance staff training is based on highly-structured training plans designed to match both the post to be filled and the qualifications possessed by the person who is to fill it. It was essential to set up suitable high-performance training resources to handle this fast growth in staff. These resources are constantly being developed and allow EDF to make steady progress in a large number of areas, varying from the effects of human factors to the procedures to be followed during an accident

  19. Project of computer program for designing the steel with the assumed CCT diagram

    OpenAIRE

    S. Malara; J. Trzaska; L.A. Dobrzański

    2007-01-01

    Purpose: The aim of this paper was developing a project of computer aided method for designing the chemicalcomposition of steel with the assumed CCT diagram.Design/methodology/approach: The purpose has been achieved in four stages. At the first stage characteristicpoints of CCT diagram have been determined. At the second stage neural networks have been developed, andnext CCT diagram terms of similarity have been worked out- at the third one. In the last one steel chemicalcomposition optimizat...

  20. Report of the design study on the proton linac of the Japanese Hadron Project, 2

    International Nuclear Information System (INIS)

    1990-06-01

    The design study on the proton linac of the Japanese Hadron Project began in May 1987, in the collaboration of Institute for Nuclear Study, University of Tokyo and National Laboratory for High Energy Physics. This is the second report of the design study on the 1-GeV proton linac, which includes the developments of the ion source, RFQ, DTL, CCL and RF sources. (author)

  1. Design of retinal-projection-based near-eye display with contact lens.

    Science.gov (United States)

    Wu, Yuhang; Chen, Chao Ping; Mi, Lantian; Zhang, Wenbo; Zhao, Jingxin; Lu, Yifan; Guo, Weiqian; Yu, Bing; Li, Yang; Maitlo, Nizamuddin

    2018-04-30

    We propose a design of a retinal-projection-based near-eye display for achieving ultra-large field of view, vision correction, and occlusion. Our solution is highlighted by a contact lens combo, a transparent organic light-emitting diode panel, and a twisted nematic liquid crystal panel. Its design rules are set forth in detail, followed by the results and discussion regarding the field of view, angular resolution, modulation transfer function, contrast ratio, distortion, and simulated imaging.

  2. [Principles and methodology for ecological rehabilitation and security pattern design in key project construction].

    Science.gov (United States)

    Chen, Li-Ding; Lu, Yi-He; Tian, Hui-Ying; Shi, Qian

    2007-03-01

    Global ecological security becomes increasingly important with the intensive human activities. The function of ecological security is influenced by human activities, and in return, the efficiency of human activities will also be affected by the patterns of regional ecological security. Since the 1990s, China has initiated the construction of key projects "Yangtze Three Gorges Dam", "Qinghai-Tibet Railway", "West-to-East Gas Pipeline", "West-to-East Electricity Transmission" and "South-to-North Water Transfer" , etc. The interaction between these projects and regional ecological security has particularly attracted the attention of Chinese government. It is not only important for the regional environmental protection, but also of significance for the smoothly implementation of various projects aimed to develop an ecological rehabilitation system and to design a regional ecological security pattern. This paper made a systematic analysis on the types and characteristics of key project construction and their effects on the environment, and on the basis of this, brought forward the basic principles and methodology for ecological rehabilitation and security pattern design in this construction. It was considered that the following issues should be addressed in the implementation of a key project: 1) analysis and evaluation of current regional ecological environment, 2) evaluation of anthropogenic disturbances and their ecological risk, 3) regional ecological rehabilitation and security pattern design, 4) scenario analysis of environmental benefits of regional ecological security pattern, 5) re-optimization of regional ecological system framework, and 6) establishment of regional ecosystem management plan.

  3. Student-Designed Service-Learning Projects in an Undergraduate Neurobiology Course

    Directory of Open Access Journals (Sweden)

    Katharine V. Northcutt

    2015-12-01

    Full Text Available One of the challenges in teaching a service-learning course is obtaining student buy-in from all students in the course. To circumvent this problem, I have let students in my undergraduate Neurobiology course design their own service-learning projects at the beginning of the semester. Although this can be chaotic because it requires last-minute planning, I have made it successful through facilitating student communication in the classroom, requiring thorough project proposals, meeting with students regularly, and monitoring group progress through written reflection papers. Most of my students have strong opinions about the types of projects that they want to carry out, and many students have used connections that they have already made with local organizations. Almost all projects that students have designed to this point involve teaching basic concepts of neurobiology to children of various ages while simultaneously sparking their interest in science. Through taking ownership of the project and designing it such that it works well with their strengths, interests, and weekly schedule, students have become more engaged in service learning and view it as a valuable experience. Despite some class time being shifted away from more traditional assignments, students have performed equally well in the course, and they are more eager to talk with others about course concepts. Furthermore, the feedback that I have received from community partners has been excellent, and some students have maintained their work with the organizations.

  4. Eco-design pilot project in China - Monsoon offer 2 upgrade

    Science.gov (United States)

    Thai, Roselyne; Liu, Guoguo

    2017-11-01

    During COP21, Schneider Electric has committed that 100% of our new products would be eco-designed to tackle climate change. Launched in 2015, this initiative ecoDesign WayTM was tested on some pilot projects. This project covers the first ecoDesign WayTM pilot in China on an overvoltage or under voltage protective device used in both residential and industrial sectors, called Monsoon. Under the name ecoDesign WayTM, a method and a process have been deployed. The 3 main ecoDesign WayTM phases are: phase 1 - Marketing & Technique handshake, Phase 2 - ecoDesign WayTM follow-up and Phase 3 - Marketing communication. During the project, EIME from Bureau Veritas CODDE and ecoDesign WayTM scorecard from EVEA consulting are two core tools for eco-design implementation. They are respectively used for life cycle assessment and eco-design performance comparison. Thanks to the approach, compared to previous range, pollution emissions and resource depletion along the whole life cycle of product have decreased (reduction of 55% for energy depletion and 85% for water depletion). Global warming potential has dramatically decreased by 98.4% and air pollution by 33%. Meanwhile, the recycling rate has been improved by 18%, and recycled PA is used. The ecoDesign WayTM scorecard is stored as referent document for any customer request. Moreover, customers can access RoHS certificate, REACh declaration, PEP and EoLI in Check a product, an online environmental data repository, available 24/7.

  5. Gaming: a creative strategy for staff education.

    Science.gov (United States)

    Swartzendruber, D

    1994-02-01

    Providing staff development in a stimulating, innovative manner is the challenge of all nurse educators. This article discusses gaming, a creative teaching strategy that can help meet these needs. Games designed specifically for the education of dialysis staff will be reviewed. Advantages of the various games will also be examined.

  6. Colour and inclusivity: a visual communication design project with older people.

    Science.gov (United States)

    da Silva, Fernando Moreira

    2012-01-01

    In an ideal world, inclusive products and services would be the standard and not the exception. This paper presents a systematic approach to an overlap between Visual Communication Design, Printed Colour and Inclusive Design, for older people, with the aim to develop of a set of research-based ageing and ergonomics-centred communication design guidelines and recommendations for printed material (analogical displays). The approach included an initial extensive literature review in the area of colour, older people and ergonomics issues and vision common diseases, communication design. The second phase was the implementation of an experiment to measure the different colour experiences of the participants in two sample groups (one in UK and another one in Portugal), using printed material, to find out the colours one should use in analogical communication material, being aware of the colour contrast importance (foreground versus background) and the difficulties experienced by older people to read and understand lettering, signs. As main contribution of this research project, we developed a set of guidelines and recommendations based on the reviewed literature and the sample groups' findings, trying to demonstrate the importance of these guidelines when conceiving a new communicational design project in a way this project will achieve vision comfort and understandability, especially for older people, in an inclusive design perspective.

  7. Job and task analysis for technical staff

    International Nuclear Information System (INIS)

    Toline, B.C.

    1991-01-01

    In September of 1989 Cooper Nuclear Station began a project to upgrade the Technical Staff Training Program. This project's roots began by performing job and Task Analysis for Technical Staff. While the industry has long been committed to Job and Task Analysis to target performance based instruction for single job positions, this approach was unique in that it was not originally considered appropriate for a group as diverse as Tech Staff. Much to his satisfaction the Job and Task Analysis Project was much less complicated for Technical Staff than the author had imagined. The benefits of performing the Job and Task Analysis for Technical Staff have become increasingly obvious as he pursues lesson plan development and course revisions. The outline for this presentation will be as follows: philosophy adopted; preparation of the job survey document; performing the job analysis; performing task analysis for technical staff and associated pitfalls; clustering objectives for training and comparison to existing program; benefits now and in the future; final phase (comparison to INPO guides and meeting the needs of non-degreed engineering professionals); and conclusion. By focusing on performance based needs for engineers rather than traditional academics for training the author is confident the future Technical Staff Program will meet the challenges ahead and will exceed requirements for accreditation

  8. Impediments to User Gains: Experiences from a Critical Participatory Design Project

    DEFF Research Database (Denmark)

    Bossen, Claus; Dindler, Christian; Iversen, Ole Sejer

    2012-01-01

    interviews with participants in a project aimed at developing technology that fosters engaging museum experiences, and rethinking cultural heritage communication. Despite the use of established PD techniques by experienced PD practitioners, a significant number of frustrations relating to the PD process were...... prominent in the research study. Based on these findings, we provide an analysis of impediments for users gains in PD projects: Differences between aims were unresolved, absence of a shared set-up for collaboration and different conceptions of technology.......Actual studies of user gains from involvement in design processes are few, although a concern for users’ gains is a core characteristic of participatory design (PD). We explore the question of user gains through a retrospective evaluation of a critical PD project. We conducted ten qualitative...

  9. Designing an intranet from scratch to sketch: experiences from techniques used in the IDEnet project

    DEFF Research Database (Denmark)

    Berndtsson, Johan

    1999-01-01

    The choice of techniques to support system design is important in order to achieve a satisfactory result with regard to the quality of the future system. In the IDEnet development project, we chose to work with techniques used within, or inspired by, three different research areas: sociology...

  10. Hierarchy of Study Designs for Evaluating the Effectiveness of a STEM Education Project or Practice

    Science.gov (United States)

    Coalition for Evidence-Based Policy, 2007

    2007-01-01

    This document contains a narrative overview of the hierarchy, followed by a one-page graphic summary. The purpose of the hierarchy is to help agency/program officials assess which study designs are capable of producing scientifically-valid evidence on the effectiveness of a STEM education project or practice ("intervention"). More specifically,…

  11. Empowering Persons with Deafblindness: Designing an Intelligent Assistive Wearable in the SUITCEYES Project

    NARCIS (Netherlands)

    Korn, Oliver; Holt, Raymond; Kontopoulos, Efstratios; Kappers, Astrid M.L.; Persson, Nils-Krister; Olson, Nasrine

    2018-01-01

    Deafblindness is a condition that limits communication capabilities primarily to the haptic channel. In the EU-funded project SUITCEYES we design a system which allows haptic and thermal communication via soft interfaces and textiles. Based on user needs and informed by disability studies, we

  12. Task Design for Intercultural Telecollaboration in Secondary Schools: Insights from the EU project TILA

    Science.gov (United States)

    Hoffstaedter, Petra; Kohn, Kurt

    2014-01-01

    Our contribution focuses on synchronous oral telecollaboration in secondary schools. With reference to the EU project TILA, aspects of task design and implementation are discussed against the backdrop of issues of technological quality in connection with class organisation in computer labs. Case study evidence is provided in favour of the…

  13. Functional design criteria radioactive liquid waste line replacement, Project W-087. Revision 3

    International Nuclear Information System (INIS)

    McVey, C.B.

    1994-01-01

    This document provides the functional design criteria for the 222-S Laboratory radioactive waste drain piping and transfer pipeline replacement. The project will replace the radioactive waste drain piping from the hot cells in 222-S to the 219-S Waste Handling Facility and provide a new waste transfer route from 219-S to the 244-S Catch Station in Tank Farms

  14. Collaborative Learning in Architectural Education: Benefits of Combining Conventional Studio, Virtual Design Studio and Live Projects

    Science.gov (United States)

    Rodriguez, Carolina; Hudson, Roland; Niblock, Chantelle

    2018-01-01

    Combinations of Conventional Studio and Virtual Design Studio (VDS) have created valuable learning environments that take advantage of different instruments of communication and interaction. However, past experiences have reported limitations in regards to student engagement and motivation, especially when the studio projects encourage abstraction…

  15. 4MOST: the 4-metre Multi-Object Spectroscopic Telescope project at preliminary design review

    NARCIS (Netherlands)

    de Jong, Roelof S.; Barden, Samuel C.; Bellido-Tirado, Olga; Brynnel, Joar G.; Frey, Steffen; Giannone, Domenico; Haynes, Roger; Johl, Diana; Phillips, Daniel; Schnurr, Olivier; Walcher, Jakob C.; Winkler, Roland; Ansorge, Wolfgang R.; Feltzing, Sofia; McMahon, Richard G.; Baker, Gabriella; Caillier, Patrick; Dwelly, Tom; Gaessler, Wolfgang; Iwert, Olaf; Mandel, Holger G.; Piskunov, Nikolai A.; Pragt, Johan H.; Walton, Nicholas A.; Bensby, Thomas; Bergemann, Maria; Chiappini, Cristina; Christlieb, Norbert; Cioni, Maria-Rosa L.; Driver, Simon; Finoguenov, Alexis; Helmi, Amina; Irwin, Michael J.; Kitaura, Francisco-Shu; Kneib, Jean-Paul; Liske, Jochen; Merloni, Andrea; Minchev, Ivan; Richard, Johan; Starkenburg, Else

    2016-01-01

    We present an overview of the 4MOST project at the Preliminary Design Review. 4MOST is a major new wide-field, high-multiplex spectroscopic survey facility under development for the VISTA telescope of ESO. 4MOST has a broad range of science goals ranging from Galactic Archaeology and stellar physics

  16. Assessment in the Context of Mathematics Instruction Reform: The Design of Assessment in the QUASAR Project.

    Science.gov (United States)

    Silver, Edward A.; Lane, Suzanne

    Recent reports on mathematics education reform have focused the attention of educational practitioners and policymakers on new goals for mathematics education and new descriptions of mathematical proficiency. QUASAR is a national project (Quantitative Understanding: Amplifying Student Achievement and Reasoning) designed to improve the mathematics…

  17. Undergraduate Electronics Projects Based on the Design of an Optical Wireless Audio Transmission System

    Science.gov (United States)

    Oliveira, Luis Bica; Paulino, Nuno; Oliveira, João P.; Santos-Tavares, Rui; Pereira, Nuno; Goes, João

    2017-01-01

    The two projects presented in this paper can be used either as two separate assignments in two different semesters or as a final assignment for undergraduate students of electrical engineering. They have two main objectives: first, to teach basic electronic circuit design concepts and, second, to motivate the students to learn more about analog…

  18. Design and Development of a User Interface for the Dynamic Model of Software Project Management.

    Science.gov (United States)

    1988-03-01

    rectory of the user’s choice for future...the last choice selected. Let us assume for the sake of this tour that the user has selected all eight choices . ESTIMATED ACTUAL PROJECT SIZE DEFINITION...manipulation of varaibles in the * •. TJin~ca model "h ... ser Inter ace for the Dynamica model was designed b in iterative process of prototyping

  19. Practicing Learner-Centered Teaching: Pedagogical Design and Assessment of a Second Life Project

    Science.gov (United States)

    Schiller, Shu Z.

    2009-01-01

    Guided by the principles of learner-centered teaching methodology, a Second Life project is designed to engage students in active learning of virtual commerce through hands-on experiences and teamwork in a virtual environment. More importantly, an assessment framework is proposed to evaluate the learning objectives and learning process of the…

  20. A Project-Based Laboratory for Learning Embedded System Design with Industry Support

    Science.gov (United States)

    Lee, Chyi-Shyong; Su, Juing-Huei; Lin, Kuo-En; Chang, Jia-Hao; Lin, Gu-Hong

    2010-01-01

    A project-based laboratory for learning embedded system design with support from industry is presented in this paper. The aim of this laboratory is to motivate students to learn the building blocks of embedded systems and practical control algorithms by constructing a line-following robot using the quadratic interpolation technique to predict the…

  1. Design Factors Influencing Quality of Building Projects in Nigeria: Consultants' Perception

    Directory of Open Access Journals (Sweden)

    Lukumon Oyedele

    2012-11-01

    Full Text Available Various factors identified from the literature that caninfluence quality of building projects in Nigeria have beenstudied by means of questionnaire survey sent to architects,engineers and quantity surveyors in the industry. From atotal response of 107 consultants, the importance of eachfactor was obtained via severity and frequency responsesof the factors. Data analysis includes comparisons ofranking among consultants using severity, frequency andimportance indexes, correlation analysis, and percentagerank agreement factor (PRAF to measure the agreement inthe importance ranking among the consultants.Correlation results between the professionals are architects/quantity surveyors (0.75, architects/engineers (0.21 ,and engineers/quantity surveyors (0.24. The percentagerank agreement factor (PRAF shows that the five mostimportant factors affecting quality are 'design changes'(78.9%; 'inadequate involvement of other professionalsduring the design stage' (78.9%; 'insufficient andunrealistic constraints of project cost' (71.1 %; 'poor levelof commitment to quality improvement among designprofessionals' (63.2%; and 'making design decisions oncost and not value of work' (55.3%. The results of this studywould provide feedback for the clients, project and qualitymangers and all the consultants in the industry, so thateffective management of quality can be ensured from theconceptual-design stage of the project.

  2. Promises, Premises and Risks: Sharing Responsibilities, Working Up Trust and Sustaining Commitment in Participatory Design Projects

    DEFF Research Database (Denmark)

    Büscher, Monika; Hartswood, Mark; Mogensen, Preben Holst

    2002-01-01

    While participatory design crosses the boundaries between technology production and use, it does not erase them. In accounts of participatory projects, the work of negotiating and changing these boundaries often recedes into the background, yet it is crucial in shaping the very nature and scope o...

  3. Using Wikis to Investigate Communication, Collaboration and Engagement in Capstone Engineering Design Projects

    Science.gov (United States)

    Berthoud, L.; Gliddon, J.

    2018-01-01

    In today's global Aerospace industry, virtual workspaces are commonly used for collaboration between geographically distributed multidisciplinary teams. This study investigated the use of wikis to look at communication, collaboration and engagement in 'Capstone' team design projects at the end of an engineering degree. Wikis were set up for teams…

  4. Developing Physics Concepts through Hands-On Problem Solving: A Perspective on a Technological Project Design

    Science.gov (United States)

    Hong, Jon-Chao; Chen, Mei-Yung; Wong, Ashley; Hsu, Tsui-Fang; Peng, Chih-Chi

    2012-01-01

    In a contest featuring hands-on projects, college students were required to design a simple crawling worm using planning, self-monitoring and self-evaluation processes to solve contradictive problems. To enhance the efficiency of problem solving, one needs to practice meta-cognition based on an application of related scientific concepts. The…

  5. Design of equipment used for high-level waste vitrification at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Vance, R.F.; Brill, B.A.; Carl, D.E.

    1997-06-01

    The equipment as designed, started, and operated for high-level radioactive waste vitrification at the West Valley Demonstration Project in western New York State is described. Equipment for the processes of melter feed make-up, vitrification, canister handling, and off-gas treatment are included. For each item of equipment the functional requirements, process description, and hardware descriptions are presented

  6. A Tire Gasification Senior Design Project That Integrates Laboratory Experiments and Computer Simulation

    Science.gov (United States)

    Weiss, Brian; Castaldi, Marco J.

    2006-01-01

    A reactor to convert waste rubber tires to useful products such as CO and H2, was investigated in a university undergraduate design project. The student worked individually with mentorship from a faculty professor who aided the student with professional critique. The student was able to research the background of the field and conceive of a novel…

  7. Bug tracking and project management system application in an electronic design company

    Directory of Open Access Journals (Sweden)

    Sadık ARSLAN

    2016-05-01

    Full Text Available In this study, commercially available Bug Tracking and Management Information Systems has been investigated in a comprehensive manner. The systems that commonly used described in detail. Bug Tracking and Project Management Systems requirements analysis of medium-sized companies and Kentkart Ege Electronic which is an Information Technology company has been made. Obtained by the analysis requirements, the appropriate tools are selected for system application. JIRA that a product of Atlassian company was determined as a Bug Tracking and Project Management application tool. In this study, JIRA system adapted to the requirements, Bug Tracking and Project Management systems is designed in a structure which can be easily used by R&D employees. Cost-Benefit analysis is done and using this project was determined to be quite useful.

  8. Design and delivery of the diamond double double bend achromat project

    International Nuclear Information System (INIS)

    Kay, J.; Hammond, N. P.; Thomson, A.

    2016-01-01

    A major project is underway at Diamond Light Source to remove one of the 24 Double Bend Achromat (DBA) Storage Ring cells and replace it with a Double Double Bend Achromat (DDBA). In this way a new Insertion Device (ID) straight can be created and so ID light can be produced and delivered to a beamline previously only capable of receiving Bending Magnet (BM) radiation. This project is in support of the micro-focus Protein Crystallography (MX) beamline VMX-m which is scheduled to take users towards the end of 2017. This paper describes the Engineering Design of the DDBA project in more detail and gives the current status of the project.

  9. Design and delivery of the diamond double double bend achromat project

    Energy Technology Data Exchange (ETDEWEB)

    Kay, J., E-mail: jim.kay@diamond.ac.uk; Hammond, N. P.; Thomson, A. [Diamond Light Source, Didcot, Oxfordshire, UK, OX11 0DE (United Kingdom)

    2016-07-27

    A major project is underway at Diamond Light Source to remove one of the 24 Double Bend Achromat (DBA) Storage Ring cells and replace it with a Double Double Bend Achromat (DDBA). In this way a new Insertion Device (ID) straight can be created and so ID light can be produced and delivered to a beamline previously only capable of receiving Bending Magnet (BM) radiation. This project is in support of the micro-focus Protein Crystallography (MX) beamline VMX-m which is scheduled to take users towards the end of 2017. This paper describes the Engineering Design of the DDBA project in more detail and gives the current status of the project.

  10. The Iodine Satellite (iSat) Project Development Towards Critical Design Review (CDR)

    Science.gov (United States)

    Dankanich, John W.; Selby, Michael; Polzin, Kurt A.; Kamhawi, Hani; Hickman, Tyler; Byrne, Larry

    2016-01-01

    Despite the prevalence of Small Satellites in recent years, the systems flown to date have very limited propulsion capability. SmallSats are typically secondary payloads and have significant constraints for volume, mass, and power in addition to limitations on the use of hazardous propellants or stored energy (i.e. high pressure vessels). These constraints limit the options for SmallSat maneuverability. NASA's Space Technology Mission Directorate approved the iodine Satellite flight project for a rapid demonstration of iodine Hall thruster technology in a 12U configuration under the Small Spacecraft Technology Program. The project formally began in FY15 as a partnership between NASA MSFC, NASA GRC, and Busek Co, Inc., with the Air Force supporting the propulsion technology maturation. The team is in final preparation of the Critical Design Review prior to initiating the fabrication and integration phase of the project. The iSat project is on schedule for a launch opportunity in November 2017.

  11. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    Energy Technology Data Exchange (ETDEWEB)

    PICKETT, W.W.

    2000-09-22

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. Because this sub-project is still in the construction/start-up phase, all verification activities have not yet been performed (e.g., canister cover cap and welding fixture system verification, MCO Internal Gas Sampling equipment verification, and As-built verification.). The verification activities identified in this report that still are to be performed will be added to the start-up punchlist and tracked to closure.

  12. DESIGN VERIFICATION REPORT SPENT NUCLEAR FUEL (SNF) PROJECT CANISTER STORAGE BUILDING (CSB)

    Energy Technology Data Exchange (ETDEWEB)

    BAZINET, G.D.

    2003-02-12

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Revision 3 of this document incorporates MCO Cover Cap Assembly welding verification activities. Verification activities for the installed and operational SSCs have been completed.

  13. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    International Nuclear Information System (INIS)

    PICKETT, W.W.

    2000-01-01

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. Because this sub-project is still in the construction/start-up phase, all verification activities have not yet been performed (e.g., canister cover cap and welding fixture system verification, MCO Internal Gas Sampling equipment verification, and As-built verification.). The verification activities identified in this report that still are to be performed will be added to the start-up punchlist and tracked to closure

  14. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    Energy Technology Data Exchange (ETDEWEB)

    BAZINET, G.D.

    2001-05-15

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Verification activities for the installed and operational SSCs have been completed. Verification of future additions to the CSB related to the canister cover cap and welding fixture system and MCO Internal Gas Sampling equipment will be completed as appropriate for those components. The open items related to verification of those requirements are noted in section 3

  15. DESIGN VERIFICATION REPORT SPENT NUCLEAR FUEL (SNF) PROJECT CANISTER STORAGE BUILDING (CSB)

    International Nuclear Information System (INIS)

    BAZINET, G.D.

    2003-01-01

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Revision 3 of this document incorporates MCO Cover Cap Assembly welding verification activities. Verification activities for the installed and operational SSCs have been completed

  16. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    International Nuclear Information System (INIS)

    BAZINET, G.D.

    2001-01-01

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Verification activities for the installed and operational SSCs have been completed. Verification of future additions to the CSB related to the canister cover cap and welding fixture system and MCO Internal Gas Sampling equipment will be completed as appropriate for those components. The open items related to verification of those requirements are noted in section 3.1.5 and will be

  17. 40 CFR 93.125 - Enforceability of design concept and scope and project-level mitigation and control measures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Enforceability of design concept and... Transit Laws § 93.125 Enforceability of design concept and scope and project-level mitigation and control... determinations for a transportation plan or TIP and are included in the project design concept and scope which is...

  18. Organization of project works in Industry 4.0 digital item designing companies

    Science.gov (United States)

    Gurjanov, A. V.; Zakoldaev, D. A.; Shukalov, A. V.; Zharinov, I. O.

    2018-05-01

    The task of the project works organization in the Industry 4.0 item designing digital factories is being studied. There is a scheme of the item designing component life cycle. There is also a scheme how to develop and confirm the quality of the item designing component documentation using the mathematical modelling. There is a description of the self-organization principles for the cyber and physical technological equipment in the Industry 4.0 «smart factory» company during the manufacturing process.

  19. Waste Receiving and Processing Facility, Module 1: Volume 7, Project design criteria

    International Nuclear Information System (INIS)

    1992-03-01

    This Project Design Criteria document for the WRAP facility at the Hanford Site is presented within a systems format. The WRAP Module 1 facility has been categorized into eight (8) engineering systems for design purposes. These systems include: receiving, shipping and storage, nondestructive assay/nondestructive examination (NDA/NDE), waste process, internal transportation, building, heating ventilation and air conditioning (HVAC), process control, and utilities. Within each system section of this document, the system-specific requirements are identified. The scope of the system is defined, the design goals are identified and the functional requirements are detailed

  20. Guidelines of the Design of Electropyrotechnic Firing Circuit for Unmanned Flight and Ground Test Projects

    Science.gov (United States)

    Gonzalez, Guillermo A.; Lucy, Melvin H.; Massie, Jeffrey J.

    2013-01-01

    The NASA Langley Research Center, Engineering Directorate, Electronic System Branch, is responsible for providing pyrotechnic support capabilities to Langley Research Center unmanned flight and ground test projects. These capabilities include device selection, procurement, testing, problem solving, firing system design, fabrication and testing; ground support equipment design, fabrication and testing; checkout procedures and procedure?s training to pyro technicians. This technical memorandum will serve as a guideline for the design, fabrication and testing of electropyrotechnic firing systems. The guidelines will discuss the entire process beginning with requirements definition and ending with development and execution.