  1. Shippingport Station Decommissioning Project

    International Nuclear Information System (INIS)

    1989-01-01

    This Topical Report is a synopsis of the decontamination of plant components and structures at the Shippingport Station Decommissioning Project (SSDP). The information is provided as a part of the Technology Transfer Program to document the preparation activities in support of the shipment of radioactive wastes and the unconditional release of the site and structural materials. 1 ref., 16 figs., 4 tabs

  2. H2FIRST Reference Station Design Task: Project Deliverable 2-2

    Energy Technology Data Exchange (ETDEWEB)

    Pratt, Joseph [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Terlip, Danny [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Ainscough, Chris [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Kurtz, Jennifer [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Elgowainy, Amgad [Argonne National Lab. (ANL), Argonne, IL (United States)

    2015-04-20

    This report presents near-term station cost results and discusses cost trends of different station types. It compares various vehicle rollout scenarios and projects realistic near-term station utilization values using the station infrastructure rollout in California as an example. It describes near-term market demands and matches those to cost-effective station concepts. Finally, the report contains detailed designs for five selected stations, which include piping and instrumentation diagrams, bills of materials, and several site-specific layout studies that incorporate the setbacks required by NFPA 2, the National Fire Protection Association Hydrogen Technologies Code. This work identified those setbacks as a significant factor affecting the ability to site a hydrogen station, particularly liquid stations at existing gasoline stations. For all station types, utilization has a large influence on the financial viability of the station.

  3. Contaminated concrete scabbling at the Shippingport station decommissioning project

    International Nuclear Information System (INIS)

    Bauer, R.G.

    1989-01-01

    The Shippingport atomic power station was the first commercial nuclear power plant in the United States, joining the Duquesne Light Company (DLC) grid in December 1957. The Shippingport station was shut down in October 1982 and defueled in preparation for dismantling. On September 6, 1984, the Shippingport Station Decommissioning Project (SSDP) office of the US Department of Energy (DOE) assumed responsibility for the site. At turnover, there were several areas in the plant where radioactive contamination was entrained in concrete surfaces. The removal of contaminated concrete at SSDP was an important part of the decontamination to meet site release criteria, which is a major consideration in the decommissioning of nuclear power reactors. The highlights of this activity include: (1) development and application of remote scabbling tools, which effectively removed the contaminated concrete surfaces, and (2) use of scabblers minimized the removal of noncontaminated concrete by removing shallow layers of the surface and contributed to waste control, since the waste form enabled good packaging efficiency

  4. The local economic and social effects of power station siting: anticipated, demonstrated and perceived

    International Nuclear Information System (INIS)

    Glasson, J.

    1980-01-01

    The paper discusses the economic and social effects of power station siting at a local level using material based on the interim research findings from a project commissioned by the Central Electricity Generating Board. The cases for and against power station development are outlined and a review of the actual economic and social effects is presented, drawn from a study of a conventional power station at Drax and a nuclear power station at Sizewell. (U.K.)

  5. Shippingport Station Decommissioning Project: Contaminated concrete removal: Topical report

    International Nuclear Information System (INIS)

    1989-01-01

    This Topical Report is a synopsis of the removal of contaminated concrete from the Shippingport Station Decommissioning Project (SSDP). The information is provided as a part of the Technology Transfer Program to document the decontamination activities in support of site release in the decommissioning of a nuclear power reactor. 4 refs., 8 figs., 2 tabs

  6. Shippingport Station Decommissioning Project

    International Nuclear Information System (INIS)

    McKernan, M.L.

    1989-01-01

    The Shippingport Atomic Power Station was located on the Ohio River in Shippingport Borough (Beaver County), Pennsylvania, USA. The US Atomic Energy Commission (AEC) constructed the plant in the mid-1950s on a seven and half acre parcel of land leased from Duquesne Light Company (DLC). The purposes were to demonstrate and to develop Pressurized Water Recovery technology and to generate electricity. DLC operated the Shippingport plant under supervision of (the successor to AEC) the Department of Energy (DOE)-Naval Reactors (NR) until operations were terminated on October 1, 1982. NR concluded end-of-life testing and defueling in 1984 and transferred the Station's responsibility to DOE Richland Operations Office (RL), Surplus Facility Management Program Office (SFMPO5) on September 5, 1984. SFMPO subsequently established the Shippingport Station Decommissioning Project and selected General Electric (GE) as the Decommissioning Operations Contractor. This report is intended to provide an overview of the Shippingport Station Decommissioning Project

  7. Analysis Methodology for Optimal Selection of Ground Station Site in Space Missions

    Science.gov (United States)

    Nieves-Chinchilla, J.; Farjas, M.; Martínez, R.

    2013-12-01

    Optimization of ground station sites is especially important in complex missions that include several small satellites (clusters or constellations) such as the QB50 project, where one ground station would be able to track several spatial vehicles, even simultaneously. In this regard the design of the communication system has to carefully take into account the ground station site and relevant signal phenomena, depending on the frequency band. To propose the optimal location of the ground station, these aspects become even more relevant to establish a trusted communication link due to the ground segment site in urban areas and/or selection of low orbits for the space segment. In addition, updated cartography with high resolution data of the location and its surroundings help to develop recommendations in the design of its location for spatial vehicles tracking and hence to improve effectiveness. The objectives of this analysis methodology are: completion of cartographic information, modelling the obstacles that hinder communication between the ground and space segment and representation in the generated 3D scene of the degree of impairment in the signal/noise of the phenomena that interferes with communication. The integration of new technologies of geographic data capture, such as 3D Laser Scan, determine that increased optimization of the antenna elevation mask, in its AOS and LOS azimuths along the horizon visible, maximizes visibility time with spatial vehicles. Furthermore, from the three-dimensional cloud of points captured, specific information is selected and, using 3D modeling techniques, the 3D scene of the antenna location site and surroundings is generated. The resulting 3D model evidences nearby obstacles related to the cartographic conditions such as mountain formations and buildings, and any additional obstacles that interfere with the operational quality of the antenna (other antennas and electronic devices that emit or receive in the same bandwidth

  8. Shippingport Station Decommissioning Project: overview and justification

    International Nuclear Information System (INIS)

    Coffman, F.E.

    1984-01-01

    The purpose of this booklet is to brief the reader on the Shippingport Station Decommissioning Project and to summarize the benefits of funding the project in FY 1984. Background information on the station and the decommissioning project is provided in this section of the booklet; the need for a reactor decommissining demonstration is discussed in the next section; and a summary of how the Shippingport Station Decommissioning Project (SSDP) provides the needed demonstration is provided in the final section

  9. Optimal Site Selection of Wind-Solar Complementary Power Generation Project for a Large-Scale Plug-In Charging Station

    Directory of Open Access Journals (Sweden)

    Wenjun Chen

    2017-10-01

    Full Text Available The wind-solar hybrid power generation project combined with electric vehicle charging stations can effectively reduce the impact on the power system caused by the random charging of electric cars, contribute to the in-situ wind-solar complementary system and reduce the harm arising from its output volatility. In this paper, the site selection index system of a landscape complementary power generation project is established by using the statistical methods and statistical analysis in the literature. Subsequently, using the Analytic Network Process to calculate the index weight, a cloud model was used in combination with preference ranking organization method for enrichment evaluations to transform and sort uncertain language information. Finally, using the results of the decision-making for the location of the Shanghai wind-solar complementary project and by carrying out contrast analysis and sensitivity analysis, the superiority and stability of the decision model constructed in this study was demonstrated.

  10. 75 FR 22674 - Moynihan Station Development Project

    Science.gov (United States)

    2010-04-29

    ... DEPARTMENT OF TRANSPORTATION Federal Railroad Administration Moynihan Station Development Project... availability of and public comment period for the Moynihan Station Development Project Environmental Assessment... 22675

  11. Shippingport Station Decommissioning Project (SSDP). A progress report

    International Nuclear Information System (INIS)

    Mullee, G.R.; Usher, J.M.

    1986-01-01

    The Shippingport Atomic Power Station was shutdown in October, 1982 by the Plant Operator, Duquesne Light Company, for decommissioning by the US Department of Energy. The planning for decommissioning was completed in September, 1983. In September, 1984 operational responsibility for the station was transferred to the DOE's Decommissioning Operations Contractor - the General Electric Company (assisted by an integrated subcontractor, MK Ferguson Company). Significant accomplishments to date include the completion of all prerequisites for decommissioning, the removal of asbestos from plant systems, loading of irradiated reactor components into the reactor vessel for shipment, the commencement of electrical deactivations and the commencement of piping/component removal. Decontamination and waste processing are progressing in support of the project schedule. The reactor vessel will be shipped as one piece on a barge for burial at Hanford, Washington. The final release of the site is scheduled for April, 1990. A technology transfer program is being utilized to disseminate information about the project

  12. Shippingport station decommissioning project ALARA Program

    Energy Technology Data Exchange (ETDEWEB)

    Crimi, F.P. [Lockheed Environmental Systems and Technology Co., Houston, TX (United States)

    1995-03-01

    Properly planned and implemented ALARA programs help to maintain nuclear worker radiation exposures {open_quotes}As Low As Reasonably Achievable.{close_quotes}. This paper describes the ALARA program developed and implemented for the decontamination and decommissioning (D&D) of the Shippingport Atomic Power Station. The elements required for a successful ALARA program are discussed along with examples of good ALARA practices. The Shippingport Atomic Power Station (SAPS) was the first commercial nuclear power plant to be built in the United States. It was located 35 miles northwest of Pittsburgh, PA on the south bank of the Ohio river. The reactor plant achieved initial criticality in December 1959. During its 25-year life, it produced 7.5 billion kilowatts of electricity. The SAPS was shut down in October 1982 and was the first large-scale U.S. nuclear power plant to be totally decommissioned and the site released for unrestricted use. The Decommission Project was estimated to take 1,007 man-rem of radiation exposure and $.98.3 million to complete. Physical decommissioning commenced in September 1985 and was completed in September 1989. The actual man-rem of exposure was 155. The project was completed 6 months ahead of schedule at a cost of $91.3 million.

  13. WVU Hydrogen Fuel Dispensing Station

    Energy Technology Data Exchange (ETDEWEB)

    Davis, William [West Virginia University Research Corporation, Morgantown, WV (United States)

    2015-09-01

    The scope of this project was changed during the course of the project. Phase I of the project was to construct a site similar to the site at Central West Virginia Regional Airport in Charleston, WV to show that duplication of the site was a feasible method of conducting hydrogen stations. Phase II of the project was necessitated due to a lack of funding that was planned for the development of the station in Morgantown. The US Department of Energy determined that the station in Charleston would be dismantled and moved to Morgantown and reassembled at the Morgantown site. This necessitated storage of the components of the station for almost a year at the NAFTC Headquarters which caused a number of issues with the equipment that will be discussed in later portions of this report. This report will consist of PHASE I and PHASE II with discussions on each of the tasks scheduled for each phase of the project.

  14. Reevaluation of air surveillance station siting

    International Nuclear Information System (INIS)

    Abbott, K.; Jannik, T.

    2016-01-01

    DOE Technical Standard HDBK-1216-2015 (DOE 2015) recommends evaluating air-monitoring station placement using the analytical method developed by Waite. The technique utilizes wind rose and population distribution data in order to determine a weighting factor for each directional sector surrounding a nuclear facility. Based on the available resources (number of stations) and a scaling factor, this weighting factor is used to determine the number of stations recommended to be placed in each sector considered. An assessment utilizing this method was performed in 2003 to evaluate the effectiveness of the existing SRS air-monitoring program. The resulting recommended distribution of air-monitoring stations was then compared to that of the existing site perimeter surveillance program. The assessment demonstrated that the distribution of air-monitoring stations at the time generally agreed with the results obtained using the Waite method; however, at the time new stations were established in Barnwell and in Williston in order to meet requirements of DOE guidance document EH-0173T.

  15. Reevaluation of air surveillance station siting

    Energy Technology Data Exchange (ETDEWEB)

    Abbott, K. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Jannik, T. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2016-07-06

    DOE Technical Standard HDBK-1216-2015 (DOE 2015) recommends evaluating air-monitoring station placement using the analytical method developed by Waite. The technique utilizes wind rose and population distribution data in order to determine a weighting factor for each directional sector surrounding a nuclear facility. Based on the available resources (number of stations) and a scaling factor, this weighting factor is used to determine the number of stations recommended to be placed in each sector considered. An assessment utilizing this method was performed in 2003 to evaluate the effectiveness of the existing SRS air-monitoring program. The resulting recommended distribution of air-monitoring stations was then compared to that of the existing site perimeter surveillance program. The assessment demonstrated that the distribution of air-monitoring stations at the time generally agreed with the results obtained using the Waite method; however, at the time new stations were established in Barnwell and in Williston in order to meet requirements of DOE guidance document EH-0173T.

  16. The regional issues involved in the siting of power stations

    International Nuclear Information System (INIS)

    Livingstone, R.

    1980-01-01

    This paper deals with the regional implications of power station siting in England and Wales and refers to the procedures used by the CEGB to find and develop sites. The resources required for a power station are outlined both for conventional and nuclear stations and the possible development of uses for the rejected heat from power stations as a result of the energy crisis is discussed. (U.K.)

  17. Live from Space Station Learning Technologies Project

    Science.gov (United States)

    2001-01-01

    This is the Final Report for the Live From Space Station (LFSS) project under the Learning Technologies Project FY 2001 of the MSFC Education Programs Department. AZ Technology, Inc. (AZTek) has developed and implemented science education software tools to support tasks under the LTP program. Initial audience consisted of 26 TreK in the Classroom schools and thousands of museum visitors to the International Space Station: The Earth Tour exhibit sponsored by Discovery Place museum.

  18. Milliken Station Demonstration Project FDG retrofit update

    Energy Technology Data Exchange (ETDEWEB)

    Alder, R.C.; Jackson, C.E.; O`Dea, D.T. [and others

    1994-12-31

    The Milliken Clean Coal Demonstration Project is one of the nine Clean Coal Projects selected for funding in Round 4 of the U.S. DOE`s Clean Coal Demonstration Program. The project`s sponsor is New York State Electric and Gas Corporation (NYSEG). Project team members include CONSOL Inc., Saarberg-Holter-Umwelttechnik (SHU), NALCO/FuelTech, Stebbins Engineering and Manufacturing Co., DHR Technologies, and CE Air Preheater. Gilbert/Commonwealth is the Architect/Engineer and Construction Manager for the flue gas desulfurization (FGD) retrofit. The project will provide full-scale demonstration of a combination of innovative emission-reducing technologies and plant upgraded for the control of sulfur dioxide (SO{sub 2}) and nitrogen oxides (NO{sub x}) emissions from a coal-fired steam generator without a significant loss of station efficiency. The overall project goals are the following: 98% SO{sub 2} removal efficiency using limestone while burning high sulfur coal; up to 70% NO{sub x} reduction using the NOXOUT selective non-catalytic reduction (SNCR) technology in conjunction with combustion modifications; minimization of solid waste by producing marketable by-products including commercial grade gypsum, calcium chloride, and fly ash; zero wastewater discharge; maintenance of station efficiency by using a high efficiency heat-pipe air heater system and a low-power-consuming scrubber system. The demonstration project is being conducted at NYSEG`s Milliken Station, located in Lansing, New York. Milliken Station has two 150-MWe pulverized coal-fired units built in the 1950s by Combustion Engineering. The SHU FGD process and the combustion modifications are being installed on both units, but the NOXOUT process, Plant Economic Optimization Advisor (PEOA), and the high-efficiency air heater system will be installed on only one unit.

  19. Argentinian experience in selecting sites for nuclear power stations

    International Nuclear Information System (INIS)

    Csik, B.J.

    1975-01-01

    One nuclear power station is in operation in the Republic of Argentina, a second is under construction, and the decision to build a third has been taken. According to existing plans, about ten nuclear power stations should go into operation during the next decade. The present paper analyses the experience acquired in selecting sites for the first units, commenting on the criteria and methods applied, the studies that were carried out, the specific problems encountered and the solutions adopted, as well as on the question of acceptance of the chosen sites by the public. It goes on to describe the current programme of selection and study of sites for future nuclear power stations

  20. Site selection model for new metro stations based on land use

    Science.gov (United States)

    Zhang, Nan; Chen, Xuewu

    2015-12-01

    Since the construction of metro system generally lags behind the development of urban land use, sites of metro stations should adapt to their surrounding situations, which was rarely discussed by previous research on station layout. This paper proposes a new site selection model to find the best location for a metro station, establishing the indicator system based on land use and combining AHP with entropy weight method to obtain the schemes' ranking. The feasibility and efficiency of this model has been validated by evaluating Nanjing Shengtai Road station and other potential sites.

  1. Expansion potential for existing nuclear power station sites

    Energy Technology Data Exchange (ETDEWEB)

    Cope, D. F.; Bauman, H. F.

    1977-09-26

    This report is a preliminary analysis of the expansion potential of the existing nuclear power sites, in particular their potential for development into nuclear energy centers (NECs) of 10 (GW(e) or greater. The analysis is based primarily on matching the most important physical characteristics of a site against the dominating site criteria. Sites reviewed consist mainly of those in the 1974 through 1976 ERDA Nuclear Power Stations listings without regard to the present status of reactor construction plans. Also a small number of potential NEC sites that are not associated with existing power stations were reviewed. Each site was categorized in terms of its potential as: a dispersed site of 5 GW(e) or less; a mini-NEC of 5 to 10 GW(e); NECs of 10 to 20 GW(e); and large NECs of more than 20 GW(e). The sites were categorized on their ultimate potential without regard to political considerations that might restrain their development. The analysis indicates that nearly 40 percent of existing sites have potential for expansion to nuclear energy centers.

  2. Expansion potential for existing nuclear power station sites

    International Nuclear Information System (INIS)

    Cope, D.F.; Bauman, H.F.

    1977-01-01

    This report is a preliminary analysis of the expansion potential of the existing nuclear power sites, in particular their potential for development into nuclear energy centers (NECs) of 10 (GW(e) or greater. The analysis is based primarily on matching the most important physical characteristics of a site against the dominating site criteria. Sites reviewed consist mainly of those in the 1974 through 1976 ERDA Nuclear Power Stations listings without regard to the present status of reactor construction plans. Also a small number of potential NEC sites that are not associated with existing power stations were reviewed. Each site was categorized in terms of its potential as: a dispersed site of 5 GW(e) or less; a mini-NEC of 5 to 10 GW(e); NECs of 10 to 20 GW(e); and large NECs of more than 20 GW(e). The sites were categorized on their ultimate potential without regard to political considerations that might restrain their development. The analysis indicates that nearly 40 percent of existing sites have potential for expansion to nuclear energy centers

  3. Shippingport station decommissioning project technology transfer program

    International Nuclear Information System (INIS)

    Pasquini, L.A.

    1986-01-01

    The purpose of the Shippingport Station Decommissioning Project (SSDP) is to place the Shippingport Atomic Power Station in a long-term radiologically safe condition following defueling of the reactor, to perform decommissioning in such a manner as to demonstrate to the nuclear industry the application of decommissioning procedures to a large scale nuclear power plant, and to provide useful planning data for future decommissioning projects. This paper describes the Technology Transfer Program for collecting and archiving the decommissioning data base and its availability to the nuclear industry

  4. 76 FR 82201 - General Site Suitability Criteria for Nuclear Power Stations

    Science.gov (United States)

    2011-12-30

    ... guidelines in identifying suitable candidate sites for nuclear power stations. The decision that a station... combination and a cost-benefit analysis comparing it with alternative site-plant combinations, as discussed in...

  5. Riel Converter Station, Winnipeg: Site selection and environmental assessment status report

    International Nuclear Information System (INIS)

    1991-01-01

    As part of its expansion plans, Manitoba Hydro is planning to construct a converter station east of Winnipeg to receive power from a 850-km dc transmission line which will be constructed to bring power from a new generating station in the north of the province. Work performed to date on site selection and preliminary environmental assessment of the converter station is reviewed. The role of the converter station is described and the potential impacts are summarized in such areas as employment opportunities, pollution and noise during construction, electric and magnetic field effects, and land use impacts. Site selection criteria are outlined and potential sites are identified and evaluated. The Deacon site has been chosen as the preferred site since it has a number of inherent advantages including existing ownership by Manitoba Hydro, proximity to existing transmission rights-of-way, and low visual and land-use impact. 12 figs

  6. A report on upgraded seismic monitoring stations in Myanmar: Station performance and site response

    Science.gov (United States)

    Thiam, Hrin Nei; Min Htwe, Yin Myo; Kyaw, Tun Lin; Tun, Pa Pa; Min, Zaw; Htwe, Sun Hninn; Aung, Tin Myo; Lin, Kyaw Kyaw; Aung, Myat Min; De Cristofaro, Jason; Franke, Mathias; Radman, Stefan; Lepiten, Elouie; Wolin, Emily; Hough, Susan E.

    2017-01-01

    Myanmar is in a tectonically complex region between the eastern edge of the Himalayan collision zone and the northern end of the Sunda megathrust. Until recently, earthquake monitoring and research efforts have been hampered by a lack of modern instrumentation and communication infrastructure. In January 2016, a major upgrade of the Myanmar National Seismic Network (MNSN; network code MM) was undertaken to improve earthquake monitoring capability. We installed five permanent broadband and strong‐motion seismic stations and real‐time data telemetry using newly improved cellular networks. Data are telemetered to the MNSN hub in Nay Pyi Taw and archived at the Incorporated Research Institutions for Seismology Data Management Center. We analyzed station noise characteristics and site response using noise and events recorded over the first six months of station operation. Background noise characteristics vary across the array, but indicate that the new stations are performing well. MM stations recorded more than 20 earthquakes of M≥4.5 within Myanmar and its immediate surroundings, including an M 6.8 earthquake located northwest of Mandalay on 13 April 2016 and the Mw 6.8 Chauk event on 24 August 2016. We use this new dataset to calculate horizontal‐to‐vertical spectral ratios, which provide a preliminary characterization of site response of the upgraded MM stations.

  7. Shippingport Station Decommissioning Project Start of Physical Decommissioning

    International Nuclear Information System (INIS)

    Crimi, F. P.

    1987-01-01

    The Shippingport Atomic Power Station consists of the nuclear steam supply system and associated radioactive waste processing systems, which are owned by the United States Department of Energy, and the turbine-generator and balance of plant, which is owned by the Duquesne Light Company. The station is located at Shippingport, Pennsylvania on seven acres of land leased by DOE from Duquesne Light Company. The Shippingport Station Decommissioning Project is being performed under contract to the DOE by the General Electric Company and its integrated subcontractor, Morrison-Knudsen Company. as the Decommissioning Operations Contractor. This paper describes the current status of the physical decommissioning work, which started September 1985. The preparations required to start a major decommissioning work effort in a safe and cost effective manner are discussed including the development and implementation of a cost/schedule control system. The detailed plan required to ensure that people, property, and procedures are ready in sufficient time to support the start of physical decommissioning is also discussed. The total estimated cost of the Shippingport Station Decommissioning Project should be $98.3 M, with the Project scheduled for completion in April 1990. As the decommissioning of the first commercial-scale nuclear power plant, the Shippingport Project is expected to set the standard for safe, cost-effective demolition of nuclear plants

  8. Waste management for the Shippingport Station Decommissioning Project

    International Nuclear Information System (INIS)

    Mullee, G.R.; Schulmeister, A.R.

    1987-01-01

    The Shippingport Station Decommissioning Project (SSDP) is being performed by the US Department of Energy (DOE) with the objectives of placing the station in a radiologically safe condition, demonstrating safe and cost effective dismantlement and providing useful data for future decommissioning projects. This paper describes the development of the Waste Management Plan which is being used for the accomplishment of the SSDP. Significant aspects of the Plan are described, such as the use of a process control and inventory system. The current status of waste management activities is reported. It is concluded that SSDP has some unique aspects which will provide useful information for future decommissioning projects

  9. GULF OF MEXICO SEAFLOOR STABILITY AND GAS HYDRATE MONITORING STATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    J. Robert Woolsey; Thomas M. McGee; Robin C. Buchannon

    2004-11-01

    The gas hydrates research Consortium (HRC), established and administered at the University if Mississippi's Center for Marine Research and Environmental Technology (CMRET) has been active on many fronts in FY 03. Extension of the original contract through March 2004, has allowed completion of many projects that were incomplete at the end of the original project period due, primarily, to severe weather and difficulties in rescheduling test cruises. The primary objective of the Consortium, to design and emplace a remote sea floor station for the monitoring of gas hydrates in the Gulf of Mexico by the year 2005 remains intact. However, the possibility of levering HRC research off of the Joint Industries Program (JIP) became a possibility that has demanded reevaluation of some of the fundamental assumptions of the station format. These provisions are discussed in Appendix A. Landmark achievements of FY03 include: (1) Continuation of Consortium development with new researchers and additional areas of research contribution being incorporated into the project. During this period, NOAA's National Undersea Research Program's (NURP) National Institute for Undersea Science and Technology (NIUST) became a Consortium funding partner, joining DOE and Minerals Management Service (MMS); (2) Very successful annual and semiannual meetings in Oxford Mississippi in February and September, 2003; (3) Collection of piston cores from MC798 in support of the effort to evaluate the site for possible monitoring station installation; (4) Completion of the site evaluation effort including reports of all localities in the northern Gulf of Mexico where hydrates have been documented or are strongly suspected to exist on the sea floor or in the shallow subsurface; (5) Collection and preliminary evaluation of vent gases and core samples of hydrate from sites in Green Canyon and Mississippi Canyon, northern Gulf of Mexico; (6) Monitoring of gas activity on the sea floor, acoustically

  10. Hydrogen fueling stations in Japan hydrogen and fuel cell demonstration project

    International Nuclear Information System (INIS)

    Koseki, K.; Tomuro, J.; Sato, H.; Maruyama, S.

    2004-01-01

    A new national demonstration project of fuel cell vehicles, which is called Japan Hydrogen and Fuel Cell Demonstration Project (JHFC Project), has started in FY2002 on a four-year plan. In this new project, ten hydrogen fueling stations have been constructed in Tokyo and Kanagawa area in FY2002-2003. The ten stations adopt the following different types of fuel and fueling methods: LPG reforming, methanol reforming, naphtha reforming, desulfurized-gasoline reforming, kerosene reforming, natural gas reforming, water electrolysis, liquid hydrogen, by-product hydrogen, and commercially available cylinder hydrogen. Approximately fifty fuel cell passenger cars and a fuel cell bus are running on public roads using these stations. In addition, two hydrogen stations will be constructed in FY2004 in Aichi prefecture where The 2005 World Exposition (EXPO 2005) will be held. The stations will service eight fuel cell buses used as pick-up buses for visitors. We, Engineering Advancement Association of Japan (ENAA), are commissioned to construct and operate a total of twelve stations by Ministry of Economy Trade and Industry (METI). We are executing to demonstrate or identify the energy-saving effect, reduction of the environmental footprint, and issues for facilitating the acceptance of hydrogen stations on the basis of the data obtained from the operation of the stations. (author)

  11. Classifying urban meteorological stations sites by 'local climate zones': Preliminary results for the city of Novi Sad (Serbia

    Directory of Open Access Journals (Sweden)

    Savić Stevan

    2013-01-01

    Full Text Available Conventional approach in the investigation of urban climate of Novi Sad has been done through simple urban-rural air temperature differences. These inter-urban air temperature differences showed how much is city warmer than its surroundings, so-called urban heat island (UHI effect. Temperature differences exist inside the city as well. To get to know the intensity of these intra-urban temperature differences, installation of meteorological stations in different parts of the city or mobile measurements are needed. In 2012 started IPA HUSRB project made by Department of Climatology and Landscape Ecology (University of Szeged and Faculty of Sciences (University of Novi Sad. The main goal of this project is the development and installation of wireless urban meteorological network (temperature and relative humidity sensors in Szeged and Novi Sad. Before the deployment of sensors, necessary metadata about each potential urban meteorological station site needs to be collected. Field work, collected metadata and Stewart and Oke climate-based classification system from 2012 were used for defining the potential urban meteorological stations sites on the territory of the city of Novi Sad (Serbia and its surroundings.

  12. Shippingport Station Decommissioning Project site release protocol

    International Nuclear Information System (INIS)

    Handy, J.W.

    1988-01-01

    The Richland, Washington field office of the DOE and its Remedial Actions Contractor, GE, took possession of the SSDP site in September 1984. In February of the following year, DOE-HQ issued generic, site independent guidelines taken from existing radiation protection standards. Basic generic dose limits were English equivalents of 1 mSv (100 mrem) per year averaged over the lifetime of any individual member of the general public. Hot spot limits were given. Occupied or habitable structures were limited to 5.2 x 10 -9 C/Kg h (20mR/h). Surface contamination was limited to standards plus average and maximum contact dose rates of 2 microGy (0.2 mrad) per hour and 10 microGy (1 mrad) per hour respectively. In addition, ''all exposures ... were to be limited to levels that (were) as low as reasonably achievable (ALARA).'' Authorized limits higher than these guidelines were allowed under given exceptional circumstances. GE determined the allowable radionuclide concentrations that could remain in soil and included rubble, and not dose the resident farmer to more than 1 mSv (100 mrem) per year. Under more conservative scenarios, however, exposures were controlled for buried, potentially occupationally occupiable, concrete substructures, to souvenir items, or to buried, but potentially exposed, concrete slabs. GE incorporated the scenario's pathways into a document implementing specific site release criteria which cannot be exceeded if the site is to be released unconditionally. 3 refs., 1 fig

  13. Comparison of conventional vs. modular hydrogen refueling stations and on-site production vs. delivery.

    Energy Technology Data Exchange (ETDEWEB)

    Hecht, Ethan S. [Sandia National Lab. (SNL-CA), Livermore, CA (United States); Pratt, Joseph William [Sandia National Lab. (SNL-CA), Livermore, CA (United States)

    2017-03-01

    To meet the needs of public and private stakeholders involved in the development, construction, and operation of hydrogen fueling stations needed to support the widespread roll-out of hydrogen fuel cell electric vehicles, this work presents publicly available station templates and analyses. These ‘Reference Stations’ help reduce the cost and speed the deployment of hydrogen stations by providing a common baseline with which to start a design, enable quick assessment of potential sites for a hydrogen station, identify contributors to poor economics, and suggest areas of research. This work presents layouts, bills of materials, piping and instrumentation diagrams, and detailed analyses of five new station designs. In the near term, delivered hydrogen results in a lower cost of hydrogen compared to on-site production via steam methane reforming or electrolysis, although the on-site production methods have other advantages. Modular station concepts including on-site production can reduce lot sizes from conventional assemble-on-site stations.

  14. Siting of Carsharing Stations Based on Spatial Multi-Criteria Evaluation: A Case Study of Shanghai EVCARD

    Directory of Open Access Journals (Sweden)

    Wenxiang Li

    2017-01-01

    Full Text Available Carsharing is one of the effective ways to relieve the problems of traffic jams, parking difficulties, and air pollution. In recent years, the numbers of carsharing services and their members have remarkably increased around the world. The project of electric carsharing in Shanghai, called EVCARD, has also developed rapidly with very large demand and supply. Aiming to determine the optimal locations of future stations of the EVCARD, this research employs a novel method combining the analytic hierarchy process (AHP and geographical information system (GIS with big data. Potential users, potential travel demand, potential travel purposes, and distance from existing stations are selected as the decision criteria. A siting decision system is established, consisting of 15 evaluation indicators which are calculated from multi-source data on mobile phones, taxi trajectory, point of interests (POI, and the EVCARD operation. The method of the AHP is used to determine the indicator weights, and the “Spatial Analyst” tool of ArcGIS is adopted to generate the indicator values for every 1 km × 1 km decision unit. Finally, synthetic scores are calculated to evaluate the candidate sites of EVCARD stations. The results of the case study verify the effectiveness of the proposed method, which can provide a more scientific and feasible method for carsharing operators to site stations, avoiding aimless and random decisions.

  15. Brentwood Lessons Learned Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Rivkin, Carl H. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Caton, Melanie C. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ainscough, Christopher D. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Marcinkoski, Jason [Dept. of Energy (DOE), Washington DC (United States)

    2017-09-26

    The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modular hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a project for

  16. Shippingport station decommissioning project technology transfer program

    International Nuclear Information System (INIS)

    McKernan, M.L.

    1988-01-01

    US Department of Energy (DOE) Shippingport Station Decommissioning Project (SSDP) decommissioned, decontaminated, and dismantled the world's first, nuclear fueled, commercial size, electric power plant. SSDP programmatic goal direction for technology transfer is documentation of project management and operations experience. Objective is to provide future nuclear facility decommissioning projects with pertinent SSDP performance data for project assessment, planning, and operational implementation. This paper presents a working definition for technology transfer. Direction is provided for access and availability for SSDP technology acquisition

  17. Dungeness Power Station off-site emergency plan

    International Nuclear Information System (INIS)

    1993-01-01

    This off-site Emergency Plan in the event of an accidental release of radioactivity at the Dungeness Nuclear power station sets out the necessary management and coordination processes between Nuclear Electric, operators of the site, the emergency services and relevant local authorities. The objectives promoting the aim are identified and the activities which will be undertaken to protect the public and the environment in the event of an emergency are outlined. (UK)

  18. Shippingport Station decommissioning project overview

    International Nuclear Information System (INIS)

    Schreiber, J.J.

    1985-01-01

    The U.S. Department of Energy is in the process of decommissioning the Shippingport Atomic Power Station located on the Ohio River, 30 miles northwest of Pittsburgh, Pennsylvania. The Shippingport Station is the first commercial size nuclear power plant to undergo decommissioning in the United Staes. The plant is located on approximately 7 acres of land owned by the Duquesne Light Company (DLC) and leased to the U.S. Government. DLC operates two nuclear power plants, Beaver Valley 1 and 2, located immediately adjacent to the site and the Bruce Mansfield coal-fired power plant is also within the immediate area. The Station was shutdown in October, 1982. Defueling operations began in 1983 and were completed by September, 1984. The Shippingport Station consists of a 275' x 60' fuel handling building containing the reactor containment chamber, the service building, the turbine building, the radioactive waste processing building, the administration building and other smaller support buildings. The Station has four coolant loops and most of the containment structures are located below grade. Structures owned by the U.S. Government including the fuel handling building, service building, contaminated equipment room, the boiler chambers, the radioactive waste processing building and the decontamination and laydown buildings will be dismantled and removed to 3 feet below grade. The area will then be filled with clean soil and graded. The turbine building, testing and training building and the administration building are owned by DLC and will remain

  19. Salt Repository Project site study plan for seismographic monitoring: Revision 1

    International Nuclear Information System (INIS)

    1987-01-01

    This site study plan describes the seismographic monitoring activities to be conducted during the early stages of Site Characterization at the Deaf Smith County site, Texas. The field programs has been designed to provide data useful in addressing information/data needs resulting from Federal/State/local regulatory requirements and repository program requirements. Sixteen new and three relocated seismographic stations will be added to the now existing network of 13 stations for a total of 32 stations in the network. The areal extent is being expanded and selected regions covered more densely to provide more accurate monitoring and location of microearthquakes. More sophisticated instruments are being used at selected locations to allow for more detailed analysis. A few seismographs are being installed at depth to provide a limited 3-D monitoring network in the area of the repository. The Salt Repository Project (SRP) Networks specify the schedule under which the program will operate. The Technique Field Services Contractor (TFSC) is responsible for conducting the field program. Data will be handled and reported in accordance with established SRP procedures. A quality assurance program will be utilized to assure that activities affecting quality are performed correctly and that appropriate documentation is maintained. 32 refs., 11 figs., 4 tabs

  20. Evaluation of sub-soil geo-electric properties in a proposed power sub-station site at Ebubu, Rivers State, Nigeria

    OpenAIRE

    T.K.S. Abam; S.A. Ngah

    2014-01-01

    Electrical resistivity survey was carried out in a site proposed for the construction and installation of a Power sub-station. The project will involve subsurface installation of cables and other objects that easily conduct electricity. Extant laws including EIA also require knowledge of subsurface distribution of resistivity in construction projects that would involve burial of steel pipes and cables. The imperative of this is emphasized by the location of the project in an area of shallow g...

  1. Environmental Assessment for Lignite Fuel Enhancement Project, Coal Creek Station, Great River Energy, Underwood, North Dakota

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2004-01-16

    The US Department of Energy (DOE) has prepared this EA to assess the environmental impacts of the commercial application of lignite fuel enhancement. The proposed demonstration project would be implemented at Great River Energy's Coal Creek Station near Underwood, North Dakota. The proposed project would demonstrate a technology to increase the heating value of lignite and other high-moisture coals by reducing the moisture in the fuels. Waste heat that would normally be sent to the cooling towers would be used to drive off a percentage of the moisture contained within the lignite. Application of this technology would be expected to boost power-generating efficiencies, provide economic cost savings for lignite and sub-bituminous power plants, and reduce air emissions. The proposed project would be constructed on a previously disturbed site within the Coal Creek Station and no negative impacts would occur in any environmental resource area.

  2. Shippingport station decommissioning project technology transfer program

    International Nuclear Information System (INIS)

    McKernan, M.L.

    1989-01-01

    The US Department of Energy (DOE) Shippingport Station Decommissioning Project (SSDP) decontaminated and dismantled the world's first nuclear-fueled, commercial-size electric power plant. The SSDP programmatic goal direction for technology transfer is documentation of project management and operations experience. The objective is to provide future nuclear facility decommissioning projects with pertinent SSDP performance data for project assessment, planning, and operational implementation. This paper sets out access and availability directions for SSDP technology acquisition. Discusses are technology transfer definition; technology transfer products including topical and other project reports, professional-technical society presentations, other project liaison and media relations, visual documentation, and technology transfer data base; and retrieving SSDP information

  3. Different methods of informing the public on projected sites of nuclear generating stations. Results in France

    International Nuclear Information System (INIS)

    Taccoen, L.B.C.

    1977-01-01

    The situation in France of local public opinion concerning nuclear power stations is very different, according to the region in question. It seems that in industrialized regions, where the inhabitants are already familiar with nuclear energy, public opinion is much more open to the installation of new reactors. In regions which are only slightly industrialized, however, the prejudices of the population against nuclear energy can be very strong. This situation is quite serious because it could lead to an even greater widening of the development gap between various regions in France. Electricite de France has thus been led to develop a program of public information concerning the problems of nuclear energy. In practice, this program consists of: a policy of active presence in meeting and debates as well as at the actual site; eventual opening of information centers; and organization of visists of existing nuclear power stations [fr

  4. Evaluation of Service Station Attendant-Auto Care Project.

    Science.gov (United States)

    Cress, Ronald J.

    The project described offers an approach to providing occupational skills to socially and educationally handicapped youth, specifically the skills necessary for a service station attendant in driveway salesmanship and auto care. The 10-page evaluation report presents project goals and objectives with evaluation data (represented graphically) and…

  5. Hinkley Point 'C' power station public inquiry: proof of evidence on on-site radioactive waste management and decommissioning

    International Nuclear Information System (INIS)

    Passant, F.H.

    1988-09-01

    A public inquiry has been set up to examine the planning application made by the Central Electricity Generating Board (CEGB) for the construction of a 1200 MW Pressurized Water Reactor power station at Hinkley Point (Hinkley Point ''C'') in the United Kingdom. The CEGB evidence to the Inquiry presented here provides information on the on-site management of solid, liquid and gaseous radioactive wastes both during station operation and during decommissioning. Estimates are given of current and projected future discharges of liquid and gaseous wastes from the site and packaging and transport arrangements for solid radioactive wastes are described. The framework of waste management policy, disposal strategy and legislation in the United Kingdom which will determine procedure at Hinkley Point ''C'' is given. (UK)

  6. Hinkley Point 'C' power station public enquiry: proof of evidence on coal fired power station sites

    Energy Technology Data Exchange (ETDEWEB)

    Fothergill, S.; Witt, S.

    1988-11-01

    The Coalfield Communities Campaign (CCC) has argued that if a new base-load power station is required it should be coal-fired rather than nuclear, and that it should use UK coal. Proposals for new power stations at both Hinkley Point and at Fawley have encountered very considerable local and regional opposition, and this is increasingly likely to be the case at many other sites especially in Southern England. In contrast the CCC has sought to demonstrate that its member authorities would generally welcome the development of new coal-fired capacity on appropriate sites within their areas. In particular, this proof establishes that there is a prima facie case for considering three sites - Thorpe Marsh, Hams Hall and Uskmouth - as potential locations for a new large coal-fired power station as an alternative to Hinkley Point C. The relevant local authorities have expressed their willingness to co-operate in more detailed planning or technical investigations to secure a coal-fired power station on these sites. The CCC considers this to be a major and unprecedented offer to the CEGB and its successor bodies, which could greatly speed the development of new power staion capacity and be of considerable economic and social benefit to coalfield communities.

  7. The activities of the IAEA in nuclear power station site studies

    International Nuclear Information System (INIS)

    Farges, L.

    1980-01-01

    This short review of IAEA activities in nuclear power station site studies gives the impression of a multiform action of unequal importance according to the projects and geographically very dispersed. It should be realised that the Agency does not possess the initiative in the development of this action and is dependent upon its member states for the preparation and finalizing of programmes, and it cannot undertake studies on the spot without the formal request of the state concerned. Furthermore, it does not have limitless means and a selection is made among the requests from the various member states which sometimes takes into account criteria other than those of a scientific or technical nature [fr

  8. Some issues on radiological consequences analysis in site selection for nuclear power stations

    International Nuclear Information System (INIS)

    Chen Xiaoqiu; Yue Huiguo

    2006-01-01

    The three considerations, Site safety and environmental protection and emergency preparedness, are the focus of attention in the evaluation of the suitability of a site for nuclear power station. This paper summarized the basic regulatory requirements for the siting of nuclear power station, described the existing problems on radiological consequences analyses during the siting stage and discussed the is- sues that need to concern in the reviewing of the radiological consequences analyses in the siting appraisal stage. (authors)

  9. Siting technology of underground nuclear power station

    International Nuclear Information System (INIS)

    Motojima, M.; Hibino, S.

    1989-01-01

    For the site of a nuclear power station, it may be possible to select a seaside mountain area, if the condition is suitable to excavate large rock caverns in which a reactor and other equipments are installed. As the case study on the siting technology for an underground nuclear power station, the following example was investigated. The site is a seaside steep mountain area, and almost all the equipments are installed in plural tunnel type caverns. The depth from the ground surface to the top of the reactor cavern is about 150 m, and the thickness of the rock pillar between the reactor cavern of 33 m W x 82 mH x 79 mD and the neighboring turbine cavern is 60 m. In this paper, the stability of rock caverns in this example, evaluated by numerical analysis, is described. The numerical analysis was carried out on the central cross section of the reactor cavern, taking the turbine cavern, geostress, the mechanical properties of rock mass and the process of excavation works in consideration. By the analysis, the underground caverns in this example were evaluated as stable, if the rock quality is equivalent to C H class or better according to the CRIEPI rock classification. (K.I.)

  10. Project authorization process in the thermal power stations vs in the hydroelectric power stations: two weights, two measurements?

    International Nuclear Information System (INIS)

    Comtois, Y.

    2004-01-01

    Key topics include the long tendering process, a comparison of two projects: thermal station vs. hydroelectrical station, and the solutions towards reducing the delay in obtaining authorization. (author)

  11. The appliction of project management in operations preparation of nuclear power station

    International Nuclear Information System (INIS)

    Tang Zhengrong; Zhang Zhixiong

    2001-01-01

    Concept, history, characteristics of the project management is introduced. Analysis is performed on the suitability of application of project management approach in nuclear power station operations preparation. Then the application of project management is detailed in order to present the readers our study and practice. Theory and practice indicate that the project management is a useful management tool for operations preparation of nuclear power station to achieve a good performance

  12. Tampa Electric Company Polk Power Station IGCC project: Project status

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D. [Tampa Electric Co., FL (United States)

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  13. Site preparation and excavation works for the foundation of station main building among construction works for No. 1 unit in Kashiwazaki-Kariwa Nuclear Pwer Station

    International Nuclear Information System (INIS)

    Ueyama, Koreyasu

    1982-01-01

    Tokyo Electric Power Co., Inc., is planning the nuclear power station of final capacity 8,000 MW (7 units) in the region spread over Kashiwazaki City and Kariwa Village in Niigata Prefecture. For No. 1 unit (1100 MWe BWR), the reactor installation license was obtained in September, 1977, the site preparation and road construction started in April, 1978, and harbour construction works started in August, 1979. The construction works are now at the peak, and the overall progressing rate as of the end of June, 1982, is about 51 %. The site is a hilly region of dune along the coast of the Sea of Japan, and No. 1 unit is located in the southern part of the site. This paper reports on the outline of the project, site preparation and excavation works for the foundation of the station main building. For the site preparation and the excavation works for the foundation the main building, the shape of slope cutting, the design of landslide-preventing wall for the vertical excavation for the reactor complex building, and the construction plan and the result are reported. For underground water impermeable wall works, its outline, groundwater condition, groundwater simulation analysis, the investigation of wall installation, the wall structure and construction are described in detail. Also the outline of the control of slope face measurement, the control standards and the measured results are reported. (Wakatsuki, Y.)

  14. Site preparation and excavation works for the foundation of station main building among construction works for No. 1 unit in Kashiwazaki-Kariwa Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Ueyama, Koreyasu [Tokyo Electric Power Co., Inc. (Japan)

    1982-09-01

    Tokyo Electric Power Co., Inc., is planning the nuclear power station of final capacity 8,000 MW (7 units) in the region spread over Kashiwazaki City and Kariwa Village in Niigata Prefecture. For No. 1 unit (1100 MWe BWR), the reactor installation license was obtained in September, 1977, the site preparation and road construction started in April, 1978, and harbour construction works started in August, 1979. The construction works are now at the peak, and the overall progressing rate as of the end of June, 1982, is about 51 %. The site is a hilly region of dune along the coast of the Sea of Japan, and No. 1 unit is located in the southern part of the site. This paper reports on the outline of the project, site preparation and excavation works for the foundation of the station main building. For the site preparation and the excavation works for the foundation the main building, the shape of slope cutting, the design of landslide-preventing wall for the vertical excavation for the reactor complex building, and the construction plan and the result are reported. For underground water impermeable wall works, its outline, groundwater condition, groundwater simulation analysis, the investigation of wall installation, the wall structure and construction are described in detail. Also the outline of the control of slope face measurement, the control standards and the measured results are reported.

  15. The application of project management in operations preparation of nuclear power station

    International Nuclear Information System (INIS)

    Zhang Zhixiong; Tang Zhengrong

    2000-01-01

    The author first presents a brief introduction of the concept, history, characteristics of project management. Analysis is performed on the suitability of application of project management approach in nuclear power station operations preparation. Then the application of project management is detailed in order to present the readers authors' study and practice. Theory and practice indicate that the project management is a useful management tool for operations preparation of nuclear power station to achieve a good performance

  16. The Grossmatt hydro-power station

    International Nuclear Information System (INIS)

    Hintermann, M.

    2006-01-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the project for a small hydropower station on the Birs river in north-western Switzerland. The report reviews the history of the project, in which a new 385 kW-hydro-power station at the site of an earlier installation is foreseen. Details are presented on the investigations made and on the co-ordination with the owners of the hydro-power station situated up-river, the local power utility and the local authorities. Also, the requirements placed on the project by the fishing authorities are quoted and the solution foreseen is described. Also discussed are the requirements placed on the project by legislation on environmental impact and flood protection. Figures on electrical energy production and building costs are presented

  17. Stratigraphic Profiles for Selected Hanford Site Seismometer Stations and Other Locations

    Energy Technology Data Exchange (ETDEWEB)

    Last, George V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-02-01

    Stratigraphic profiles were constructed for eight selected Hanford Site seismometer stations, five Hanford Site facility reference locations, and seven regional three-component broadband seismometer stations. These profiles provide interpretations of the subsurface layers to support estimation of ground motions from past earthquakes, and the prediction of ground motions from future earthquakes. In most cases these profiles terminated at the top of the Wanapum Basalt, but at selected sites profiles were extended down to the top of the crystalline basement. The composite one-dimensional stratigraphic profiles were based primarily on previous interpretations from nearby boreholes, and in many cases the nearest deep borehole is located kilometers away.

  18. A Study on Site Selecting for National Project including High Level Radioactive Waste Disposal

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kilyoo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    Many national projects are stopped since sites for the projects are not determined. The sites selections are hold by NIMBY for unpleasant facilities or by PYMFY for preferable facilities among local governments. The followings are the typical ones; NIMBY projects: high level radioactive waste disposal, THAAD, Nuclear power plant(NPP), etc. PIMFY projects: South-east new airport, KTX station, Research center for NPP decommission, etc. The site selection for high level radioactive waste disposal is more difficult problem, and thus government did not decide and postpone to a dead end street. Since it seems that there is no solution for site selection for high level radioactive waste disposal due to NIMBY among local governments, a solution method is proposed in this paper. To decide a high level radioactive waste disposal, the first step is to invite a bid by suggesting a package deal including PIMFY projects such as Research Center for NPP decommission. Maybe potential host local governments are asked to submit sealed bids indicating the minimum compensation sum that they would accept the high level radioactive waste disposal site. If there are more than one local government put in a bid, then decide an adequate site by considering both the accumulated PESS point and technical evaluation results. By considering how fairly preferable national projects and unpleasant national projects are distributed among local government, sites selection for NIMBY or PIMFY facilities is suggested. For NIMBY national projects, risk, cost benefit analysis is useful and required since it generates cost value to be used in the PESS. For many cases, the suggested method may be not adequate. However, similar one should be prepared, and be basis to decide sites for NIMBY or PIMFY national projects.

  19. California Hydrogen Infrastructure Project

    Energy Technology Data Exchange (ETDEWEB)

    Heydorn, Edward C

    2013-03-12

    Air Products and Chemicals, Inc. has completed a comprehensive, multiyear project to demonstrate a hydrogen infrastructure in California. The specific primary objective of the project was to demonstrate a model of a real-world retail hydrogen infrastructure and acquire sufficient data within the project to assess the feasibility of achieving the nation's hydrogen infrastructure goals. The project helped to advance hydrogen station technology, including the vehicle-to-station fueling interface, through consumer experiences and feedback. By encompassing a variety of fuel cell vehicles, customer profiles and fueling experiences, this project was able to obtain a complete portrait of real market needs. The project also opened its stations to other qualified vehicle providers at the appropriate time to promote widespread use and gain even broader public understanding of a hydrogen infrastructure. The project engaged major energy companies to provide a fueling experience similar to traditional gasoline station sites to foster public acceptance of hydrogen. Work over the course of the project was focused in multiple areas. With respect to the equipment needed, technical design specifications (including both safety and operational considerations) were written, reviewed, and finalized. After finalizing individual equipment designs, complete station designs were started including process flow diagrams and systems safety reviews. Material quotes were obtained, and in some cases, depending on the project status and the lead time, equipment was placed on order and fabrication began. Consideration was given for expected vehicle usage and station capacity, standard features needed, and the ability to upgrade the station at a later date. In parallel with work on the equipment, discussions were started with various vehicle manufacturers to identify vehicle demand (short- and long-term needs). Discussions included identifying potential areas most suited for hydrogen fueling

  20. Recent Experience Using Active Love Wave Techniques to Characterize Seismographic Station Sites

    Science.gov (United States)

    Martin, A. J.; Yong, A.; Salomone, L.

    2014-12-01

    Active-source Love waves recorded by the multi-channel analysis of surface wave (MASLW) technique were recently analyzed in two site characterization projects. Between 2010 and 2011, the 2009 American Recovery and Reinvestment Act (ARRA) funded GEOVision to conduct geophysical investigations at 189 seismographic stations—185 in California and 4 in the Central Eastern U.S. (CEUS). The original project plan was to utilize active and passive Rayleigh wave-based techniques to obtain shear-wave velocity (VS) profiles to a minimum depth of 30 m and the time-averaged VS of the upper 30 meters (VS30). Early in the investigation it became evident that Rayleigh wave techniques, such as multi-channel analysis of surface waves (MASRW), were not effective at characterizing all sites. Shear-wave seismic refraction and MASLW techniques were therefore applied. The MASLW technique was deployed at a total of 38 sites, in addition to other methods, and used as the primary technique to characterize 22 sites, 5 of which were also characterized using Rayleigh wave techniques. In 2012, the Electric Power Research Institute funded characterization of 33 CEUS station sites. Based on experience from the ARRA investigation, both MASRW and MASLW data were acquired by GEOVision at 24 CEUS sites—the remaining 9 sites and 2 overlapping sites were characterized by University of Texas, Austin. Of the 24 sites characterized by GEOVision, 16 were characterized using MASLW data, 4 using both MASLW and MASRW data and 4 using MASRW data. Love wave techniques were often found to perform better, or at least yield phase velocity data that could be more readily modeled using the fundamental mode assumption, at shallow rock sites, sites with steep velocity gradients, and, sites with a thin, low velocity, surficial soil layer overlying stiffer sediments. These types of velocity structure often excite dominant higher modes in Rayleigh wave data, but not in Love wave data. At such sites, it may be possible

  1. The behaviour of residual contaminants at a former station site, Antarctica

    International Nuclear Information System (INIS)

    Webster, Jenny; Webster, Kerry; Nelson, Peter; Waterhouse, Emma

    2003-01-01

    Minor contamination by metals, phosphorus, and fuel products were found at a former research station site in Antarctica. - In 1994, New Zealand's only mainland Antarctic base, Vanda Station, was removed from the shores of Lake Vanda, in the McMurdo Dry Valleys region of southern Victoria Land, Antarctica. Residual chemical contamination of the station site has been identified, in the form of discrete fuel spills, locally elevated Pb, Zn, Ag and Cd concentrations in soil and elevated Cu, Ni, Co and phosphate concentrations in suprapermafrost fluids in a gully formerly used for domestic washing water disposal. Pathways for contaminant transfer to Lake Vanda, potential environmental impacts and specific remediation/monitoring options are considered. While some contaminants (particularly Zn) could be selectively leached from flooded soil, during a period of rising lake level, the small area of contaminated soils exposed and low level of contamination suggests that this would not adversely affect either shallow lake water quality or the growth of cyanobacteria. Phosphate-enhanced growth of the latter may, however, be a visible consequence of the minor contamination occurring at this site

  2. Solar-Assisted Electric Vehicle Charging Station Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Lapsa, Melissa Voss [ORNL; Durfee, Norman [ORNL; Maxey, L Curt [ORNL; Overbey, Randall M [ORNL

    2011-09-01

    Oak Ridge National Laboratory (ORNL) has been awarded $6.8 million in the Department of Energy (DOE) American Recovery and Reinvestment Act (ARRA) funds as part of an overall $114.8 million ECOtality grant with matching funds from regional partners to install 125 solar-assisted Electric Vehicle (EV) charging stations across Knoxville, Nashville, Chattanooga, and Memphis. Significant progress has been made toward completing the scope with the installation of 25 solar-assisted charging stations at ORNL; six stations at Electric Power Research Institute (EPRI); and 27 stations at Nissan's Smyrna and Franklin sites, with three more stations under construction at Nissan's new lithium-ion battery plant. Additionally, the procurement process for contracting the installation of 34 stations at Knoxville, the University of Tennessee Knoxville (UTK), and Nashville sites is underway with completion of installation scheduled for early 2012. Progress is also being made on finalizing sites and beginning installations of 30 stations in Nashville, Chattanooga, and Memphis by EPRI and Tennessee Valley Authority (TVA). The solar-assisted EV charging station project has made great strides in fiscal year 2011. A total of 58 solar-assisted EV parking spaces have been commissioned in East and Middle Tennessee, and progress on installing the remaining 67 spaces is well underway. The contract for the 34 stations planned for Knoxville, UTK, and Nashville should be underway in October with completion scheduled for the end of March 2012; the remaining three Nissan stations are under construction and scheduled to be complete in November; and the EPRI/TVA stations for Chattanooga, Vanderbilt, and Memphis are underway and should be complete by the end of March 2012. As additional Nissan LEAFs are being delivered, usage of the charging stations has increased substantially. The project is on course to complete all 125 solar-assisted EV charging stations in time to collect meaningful data

  3. A case-based reasoning approach for estimating the costs of pump station projects

    Directory of Open Access Journals (Sweden)

    Mohamed M. Marzouk

    2011-10-01

    Full Text Available The effective estimation of costs is crucial to the success of construction projects. Cost estimates are used to evaluate, approve and/or fund projects. Organizations use some form of classification system to identify the various types of estimates that may be prepared during the lifecycle of a project. This research presents a parametric-cost model for pump station projects. Fourteen factors have been identified as important to the influence of the cost of pump station projects. A data set that consists of forty-four pump station projects (fifteen water and twenty-nine waste water are collected to build a Case-Based Reasoning (CBR library and to test its performance. The results obtained from the CBR tool are processed and adopted to improve the accuracy of the results. A numerical example is presented to demonstrate the development of the effectiveness of the tool.

  4. National Ignition Facility Project Site Safety Program

    International Nuclear Information System (INIS)

    Dun, C

    2003-01-01

    This Safety Program for the National Ignition Facility (NIF) presents safety protocols and requirements that management and workers shall follow to assure a safe and healthful work environment during activities performed on the NIF Project site. The NIF Project Site Safety Program (NPSSP) requires that activities at the NIF Project site be performed in accordance with the ''LLNL ES and H Manual'' and the augmented set of controls and processes described in this NIF Project Site Safety Program. Specifically, this document: (1) Defines the fundamental NIF site safety philosophy. (2) Defines the areas covered by this safety program (see Appendix B). (3) Identifies management roles and responsibilities. (4) Defines core safety management processes. (5) Identifies NIF site-specific safety requirements. This NPSSP sets forth the responsibilities, requirements, rules, policies, and regulations for workers involved in work activities performed on the NIF Project site. Workers are required to implement measures to create a universal awareness that promotes safe practice at the work site and will achieve NIF management objectives in preventing accidents and illnesses. ES and H requirements are consistent with the ''LLNL ES and H Manual''. This NPSSP and implementing procedures (e.g., Management Walkabout, special work procedures, etc.,) are a comprehensive safety program that applies to NIF workers on the NIF Project site. The NIF Project site includes the B581/B681 site and support areas shown in Appendix B

  5. Gas expanders at M/R Stations in the natural gas distribution network. Pre-project, subreport; Gasexpandere paa distributionsnettets M/R-stationer. Forprojekt, delrapport

    Energy Technology Data Exchange (ETDEWEB)

    Rasmussen, Niels Bjarne

    2010-05-15

    Danish Gas Technology Centre has been carrying out a feasibility project to clarify the possibilities of installing gas expanders at M/R-stations (Measuring and Regulating) in the Distribution system of the natural gas grid. A large number of such expanders are installed around the world. The novelty of this project is to use a heat pump to perform the necessary heating of the gas before the expander, and to ''export'' to the electricity grid the remaining electricity from the generator connected to the expander. The present project includes the small M/R-stations at the gas Distribution grid where pressure is reduced from 40 or 20 bar to 4 bar. The preliminary project (year 1 of project) has investigated whether components for such smaller systems can be found, and it has investigated prices for different quantities. A technical feasibility study has been done. Also, preliminary calculations of payback times has been carried out. A large potential of CO{sub 2}-reduction is present with this technology based on saving of natural gas combustion and on new electricity production displacing existing production without any use of primary energy. The main results and conclusions are: 1) There are component suppliers for expander systems suitable to the size of distribution network M/R stations. 2) Pressure regulators provided at the stations are laid out with significant overcapacity, enabling a simplified installation of the expander systems. 3) If the system is being rolled out across the Danish distribution grid, the realistic saving potential is approx. 2.3 million Nm3 of gas per year and a production of almost 40 million kWh of electricity. 4) If the price is 0.60 DKK/kWh for electricity sold, the simple pay-back is 6-7 years on average, covering a variation from 3 to 16 years at the various stations. The smallest stations are omitted. The best stations covering more than half of the gas flow have a pay-back time between 3 and 6 years. 5) The

  6. Fuel Retrieval Sub-Project (FRS) Stuck Fuel Station Performance Test Data Report

    International Nuclear Information System (INIS)

    THIELGES, J.R.

    2000-01-01

    This document provides the test data report for Stuck Fuel Station Performance Testing in support of the Fuel Retrieval Sub-Project. The stuck fuel station was designed to provide a means of cutting open a canister barrel to release fuel elements, etc

  7. Guide for Identifying and Converting High-Potential Petroleum Brownfield Sites to Alternative Fuel Stations

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, C.; Hettinger, D.; Mosey, G.

    2011-05-01

    Former gasoline stations that are now classified as brownfields can be good sites to sell alternative fuels because they are in locations that are convenient to vehicles and they may be seeking a new source of income. However, their success as alternative fueling stations is highly dependent on location-specific criteria. First, this report outlines what these criteria are, how to prioritize them, and then applies that assessment framework to five of the most popular alternative fuels--electricity, natural gas, hydrogen, ethanol, and biodiesel. The second part of this report delves into the criteria and tools used to assess an alternative fuel retail site at the local level. It does this through two case studies of converting former gasoline stations in the Seattle-Eugene area into electric charge stations. The third part of this report addresses steps to be taken after the specific site has been selected. This includes choosing and installing the recharging equipment, which includes steps to take in the permitting process and key players to include.

  8. Near-Site Transportation Infrastructure Project

    International Nuclear Information System (INIS)

    Viebrock, J.M.; Mote, N.

    1992-02-01

    There are 122 commercial nuclear facilities from which spent nuclear fuel will be accepted by the Federal Waste Management System (FWMS). Since some facilities share common sites and some facilities are on adjacent sites, 76 sites were identified for the Near-Site Transportation Infrastructure (NSTI) project. The objective of the NSTI project was to identify the options available for transportation of spent-fuel casks from each of these commercial nuclear facility sites to the main transportation routes -- interstate highways, commercial rail lines and navigable waterways available for commercial use. The near-site transportation infrastructure from each site was assessed, based on observation of technical features identified during a survey of the routes and facilities plus data collected from referenced information sources. The potential for refurbishment of transportation facilities which are not currently operational was also assessed, as was the potential for establishing new transportation facilities

  9. Early Site Permit Demonstration Program: Station design alternatives report

    International Nuclear Information System (INIS)

    1993-03-01

    This report provides the results of investigating the basis for including Station Design Alternatives (SDAs) in the regulatory guidance given for nuclear plant environmental reports (ERs), explains approaches or processes for evaluating SDAs at the early site permit (ESP) stage, and applies one of the processes to each of the ten systems or subsystems considered as SDAS. The key objective o this report s to demonstrate an adequate examination of alternatives can be performed without the extensive development f design data. The report discusses the Composite Suitability Approach and the Established Cutoff Approach in evaluating station design alternatives and selects one of these approaches to evaluate alternatives for each of the plant or station that were considered. Four types of ALWRs have been considered due to the availability of extensive plant data: System 80+, AP600, Advanced Boiling Reactor (ABWR), and Simplified Boiling Water Reactor (SBWR). This report demonstrates the feasibility of evaluating station design alternatives when reactor design detail has not been determined, quantitatively compares the potential ental impacts of alternatives, and focuses the ultimate selection of a alternative on cost and applicant-specific factors. The range of alternatives system is deliberately limited to a reasonable number to demonstrate the or to the three most commonly used at operating plants

  10. Project Rio Blanco: site restoration. Final report

    International Nuclear Information System (INIS)

    1978-01-01

    Project Rio Blanco was a joint Government-industry experiment using nuclear explosives to stimulate the flow of natural gas from low permeability formations which could not be economically produced through conventional methods. The project consisted of the simultaneous detonation of three nuclear explosives on May 17, 1973, in a 7,000 foot well in northwestern Colorado. Gas production testing and project evaluation continued through June 1976. The site cleanup and restoration planning phase began in December 1975 and was concluded with the issuance of an operational plan, Project Rio Blanco Site Cleanup and Restoration Plan, NVO-173, in May 1976. Actual site restoration activities were conducted during the period from July to November 1976. The activities throughout the restoration period are summarized and the final site status, including the disposition of all project facilities and the status of all project related wells after plug and abandonment and recompletion work are described

  11. Fire hazards analysis for the replacement cross-site transfer system, project W-058

    International Nuclear Information System (INIS)

    Sepahpur, J.B.

    1996-01-01

    The fire hazards analysis assess the risk from fire and determines compliance with the applicable criteria of DOE 5480.7A, DOE 6430.1A, and RLID 5480.7. (Project W-058 will provide encased pipelines to connect the SY Tank Farms in 200 West Area with the tank farms in 200 East Area via an interface with the 244-A lift station. Function of the cross-site transfer system will be to transfer radioactive waste from the SY Tank Farm to treatment, storage, and disposal facilities in 200 East Area.)

  12. Characterizing toxic emissions from a coal-fired power plant demonstrating the AFGD ICCT Project and a plant utilizing a dry scrubber/baghouse system: Bailly Station Units 7 and 8 and AFGD ICCT Project. Final report. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Dismukes, E.B.

    1994-10-20

    This report describes results of assessment of the risk of emissions of hazardous air pollutants at one of the electric power stations, Bailly Station, which is also the site of a Clean Coal Technology project demonstrating the Pure Air Advanced Flue Gas Desulfurization process (wet limestone). This station represents the configuration of no NO{sub x} reduction, particulate control with electrostatic precipitators, and SO{sub 2} control with a wet scrubber. The test was conducted September 3--6, 1993. Sixteen trace metals were determined along with 5 major metals. Other inorganic substances and organic compounds were also determined.

  13. A Renewably Powered Hydrogen Generation and Fueling Station Community Project

    Science.gov (United States)

    Lyons, Valerie J.; Sekura, Linda S.; Prokopius, Paul; Theirl, Susan

    2009-01-01

    The proposed project goal is to encourage the use of renewable energy and clean fuel technologies for transportation and other applications while generating economic development. This can be done by creating an incubator for collaborators, and creating a manufacturing hub for the energy economy of the future by training both white- and blue-collar workers for the new energy economy. Hydrogen electrolyzer fueling stations could be mass-produced, shipped and installed in collaboration with renewable energy power stations, or installed connected to the grid with renewable power added later.

  14. Characterization of site conditions for selected seismic stations in eastern part of Romania

    Science.gov (United States)

    Grecu, B.; Zaharia, B.; Diaconescu, M.; Bala, A.; Nastase, E.; Constantinescu, E.; Tataru, D.

    2018-02-01

    Strong motion data are essential for seismic hazard assessment. To correctly understand and use this kind of data is necessary to have a good knowledge of local site conditions. Romania has one of the largest strong motion networks in Europe with 134 real-time stations. In this work, we aim to do a comprehensive site characterization for eight of these stations located in the eastern part of Romania. We make use of a various seismological dataset and we perform ambient noise and earthquake-based investigations to estimate the background noise level, the resonance frequencies and amplification of each site. We also derive the Vs30 parameter from the surface shear-wave velocity profiles obtained through the inversion of the Rayleigh waves recorded in active seismic measurements. Our analyses indicate similar results for seven stations: high noise levels for frequencies larger than 1 Hz, well defined fundamental resonance at low frequencies (0.15-0.29 Hz), moderate amplification levels (up to 4 units) for frequencies between 0.15 and 5-7 Hz and same soil class (type C) according to the estimated Vs30 and Eurocode 8. In contrast, the eighth station for which the soil class is evaluated of type B exhibits a very good noise level for a wide range of frequencies (0.01-20 Hz), a broader fundamental resonance at high frequencies ( 8 Hz) and a flat amplification curve between 0.1 and 3-4 Hz.

  15. Shippingport station decommissioning project irradiated components transfer: Topical report

    International Nuclear Information System (INIS)

    1988-01-01

    This topical report is a synopsis of the transfer of irradiated components into the Shippingport Reactor Pressure Vessel (RPV) performed at the Shippingport Station Decommissioning Project (SSDP). The information is provided as a part of the Technology Transfer Program to document the preparation activities for the decommissioning of a nuclear power reactor to be removed in one piece

  16. Guidance document for preparing water sampling and analysis plans for UMTRA Project sites. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    A water sampling and analysis plan (WSAP) is prepared for each Uranium Mill Tailings Remedial Action (UMTRA) Project site to provide the rationale for routine ground water sampling at disposal sites and former processing sites. The WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine ground water monitoring stations at each site. This guidance document has been prepared by the Technical Assistance Contractor (TAC) for the US Department of Energy (DOE). Its purpose is to provide a consistent technical approach for sampling and monitoring activities performed under the WSAP and to provide a consistent format for the WSAP documents. It is designed for use by the TAC in preparing WSAPs and by the DOE, US Nuclear Regulatory Commission, state and tribal agencies, other regulatory agencies, and the public in evaluating the content of WSAPS

  17. Umatilla Satellite and Release Sites Project : Final Siting Report.

    Energy Technology Data Exchange (ETDEWEB)

    Montgomery, James M.

    1992-04-01

    This report presents the results of site analysis for the Umatilla Satellite and Release Sites Project. The purpose of this project is to provide engineering services for the siting and conceptual design of satellite and release facilities for the Umatilla Basin hatchery program. The Umatilla Basin hatchery program consists of artificial production facilities for salmon and steelhead to enhance production in the Umatilla River as defined in the Umatilla master plan approved in 1989 by the Northwest Power Planning Council. Facilities identified in the master plan include adult salmon broodstock holding and spawning facilities, facilities for recovery, acclimation, and/or extended rearing of salmon juveniles, and development of river sites for release of hatchery salmon and steelhead. The historic and current distribution of fall chinook, summer chinook, and coho salmon and steelhead trout was summarized for the Umatilla River basin. Current and future production and release objectives were reviewed. Twenty seven sites were evaluated for the potential and development of facilities. Engineering and environmental attributes of the sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  18. TEPCO plans to construct Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Tsuruta, Atsushi

    2008-01-01

    In 2006, TEPCO submitted to the government plans for the construction of Higashidori Nuclear Power Station. The application was filed 41 years after the project approved by the Higashidori Village Assembly. This nuclear power station will be the first new nuclear power plant constructed by TEPCO since the construction of Units No.6 and 7 at the Kashiwazaki Kariwa Nuclear Power Station 18 years ago. Higashidori Nuclear Power Station is to be constructed at a completely new site, which will become the fourth TEPCO nuclear power station. Higashidori Nuclear Power Station Unit No.1 will be TEPCO's 18th nuclear reactor. Unit No.1 will be an advanced boiling water reactor (ABWR), a reactor-type with a proven track record. It will be TEPCO's third ABWR. Alongside incorporating the latest technology, in Higashidori Nuclear Power Station Unit No.1, the most important requirement is for TEPCO to reflect in the new unit information and experience acquired from the operation of other reactors (information and experience acquired through the experience of operating TEPCO's 17 units at Fukushima Daiichi Nuclear Power Station, Fukushima Daini Nuclear Power Station and Kashiwazaki Kashiwa Nuclear Power Station in addition to information on non-conformities at nuclear power stations in Japan and around the world). Higashidori Nuclear Power Station is located in Higashidori-Village (Aomori Prefecture) and the selected site includes a rich natural environment. From an environmental perspective, we will implement the construction with due consideration for the land and sea environment, aiming to ensure that the plant can co-exist with its natural surroundings. The construction plans are currently being reviewed by the Nuclear and Industrial Safety Agency. We are committed to making progress in the project for the start of construction and subsequent commercial operation. (author)

  19. Point Lepreau generating station

    International Nuclear Information System (INIS)

    Ganong, G.H.D.; Strang, A.E.; Gunter, G.E.; Thompson, T.S.

    Point Lepreau-1 reactor is a 600 MWe generating station expected to be in service by October 1979. New Brunswick is suffering a 'catch up' phenomenon in load growth and needs to decrease dependence on foreign oil. The site is on salt water and extensive study has gone into corrosion control. Project management, financing and scheduling have unique aspects. (E.C.B.)

  20. Nuclear Station Facilities Improvement Planning

    International Nuclear Information System (INIS)

    Hooks, R. W.; Lunardini, A. L.; Zaben, O.

    1991-01-01

    An effective facilities improvement program will include a plan for the temporary relocation of personnel during the construction of an adjoining service building addition. Since the smooth continuation of plant operation is of paramount importance, the phasing plan is established to minimize the disruptions in day-to-day station operation and administration. This plan should consider the final occupancy arrangements and the transition to the new structure; for example, computer hookup and phase-in should be considered. The nuclear industry is placing more emphasis on safety and reliability of nuclear power plants. In order to do this, more emphasis is placed on operations and maintenance. This results in increased size of managerial, technical and maintenance staffs. This in turn requires improved office and service facilities. The facilities that require improvement may include training areas, rad waste processing and storage facilities, and maintenance facilities. This paper discusses an approach for developing an effective program to plan and implement these projects. These improvement projects can range in magnitude from modifying a simple system to building a new structure to allocating space for a future project. This paper addresses the planning required for the new structures with emphasis on site location, space allocation, and internal layout. Since facility planning has recently been completed by Sargent and Leyden at six U. S. nuclear stations, specific examples from some of those plants are presented. Site planning and the establishment of long-range goals are of the utmost importance when undertaking a facilities improvement program for a nuclear station. A plan that considers the total site usage will enhance the value of both the new and existing facilities. Proper planning at the beginning of the program can minimize costs and maximize the benefits of the program

  1. Experimental measurement at the seismic station Ostrava-Krásné Pole (OKC): preliminary results and remarks on site effect at the studied locality

    Czech Academy of Sciences Publication Activity Database

    Lednická, Markéta; Rušajová, Jana

    2016-01-01

    Roč. 13, č. 2 (2016), s. 137-147 ISSN 1214-9705 R&D Projects: GA MŠk LM2010008; GA ČR GP13-07027P Institutional support: RVO:68145535 Keywords : seismic station OKC * spectral ratio * site effect Subject RIV: JM - Building Engineering Impact factor: 0.699, year: 2016 https://www.irsm.cas.cz/index.php?page=acta_content_doi&id_cislo=17

  2. Decontamination of the site of an army gasoline service station

    International Nuclear Information System (INIS)

    Hoffmann, J.; Katzer, W.; Scheidt, M.; Roll, S.

    1994-01-01

    This is a report on the decontamination of the site of a gasoline service station at the Fuchsberg barracks at Salzwedel. Albeit that the accident is not spectacular for its magnitude, this case is interesting and exemplary because of the combined use of the most diverse decontamination methods. Soi air removal by suction, ground water decontamination, and microbiological soil decontamination were successfully used in conjunction. (orig.) [de

  3. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    McFarlane, J.D.

    1982-11-01

    The NNC construction programme for the Sizewell B nuclear power station is outlined. The following topics are considered: constructability aspects of the Sizewell B design; overall project programme and organization; NNC target construction programme; construction planning; material quantities and installation rates; site construction manpowers; construction contracting policy; site industrial relations and productivity; site management. (U.K.)

  4. Geospatial Optimization of Siting Large-Scale Solar Projects

    Energy Technology Data Exchange (ETDEWEB)

    Macknick, Jordan [National Renewable Energy Lab. (NREL), Golden, CO (United States); Quinby, Ted [National Renewable Energy Lab. (NREL), Golden, CO (United States); Caulfield, Emmet [Stanford Univ., CA (United States); Gerritsen, Margot [Stanford Univ., CA (United States); Diffendorfer, Jay [U.S. Geological Survey, Boulder, CO (United States); Haines, Seth [U.S. Geological Survey, Boulder, CO (United States)

    2014-03-01

    Recent policy and economic conditions have encouraged a renewed interest in developing large-scale solar projects in the U.S. Southwest. However, siting large-scale solar projects is complex. In addition to the quality of the solar resource, solar developers must take into consideration many environmental, social, and economic factors when evaluating a potential site. This report describes a proof-of-concept, Web-based Geographical Information Systems (GIS) tool that evaluates multiple user-defined criteria in an optimization algorithm to inform discussions and decisions regarding the locations of utility-scale solar projects. Existing siting recommendations for large-scale solar projects from governmental and non-governmental organizations are not consistent with each other, are often not transparent in methods, and do not take into consideration the differing priorities of stakeholders. The siting assistance GIS tool we have developed improves upon the existing siting guidelines by being user-driven, transparent, interactive, capable of incorporating multiple criteria, and flexible. This work provides the foundation for a dynamic siting assistance tool that can greatly facilitate siting decisions among multiple stakeholders.

  5. Clean coal technology project to Polk Power Station, Tampa Electric Company, Florida, Volume 1: Report

    International Nuclear Information System (INIS)

    1994-06-01

    Tampa Electric Company proposes to construct and operate a 1,150-MW power station in southwestern Polk County, Florida. The proposed Polk Power Station would require an EPA NPDES permit for a new source and would include a 260-MW IGCC unit as a DOE Clean Coal Technology demonstration project. This EIS document assesses the proposed project and alternatives with respect to environmental impacts. Mitigative measures are also evaluated for the preferred alternative. Included in this Volume I are the following: alternatives including Tampa Electric Companies proposed project (preferred alternative with DOE financial assistance); affected environment; environmental consequences of the alternatives

  6. International remote monitoring project Argentina Nuclear Power Station Spent Fuel Transfer Remote Monitoring System

    International Nuclear Information System (INIS)

    Schneider, S.; Lucero, R.; Glidewell, D.

    1997-01-01

    The Autoridad Regulataria Nuclear (ARN) and the United States Department of Energy (DOE) are cooperating on the development of a Remote Monitoring System for nuclear nonproliferation efforts. A Remote Monitoring System for spent fuel transfer will be installed at the Argentina Nuclear Power Station in Embalse, Argentina. The system has been designed by Sandia National Laboratories (SNL), with Los Alamos National Laboratory (LANL) and Oak Ridge National Laboratory (ORNL) providing gamma and neutron sensors. This project will test and evaluate the fundamental design and implementation of the Remote Monitoring System in its application to regional and international safeguards efficiency. This paper provides a description of the monitoring system and its functions. The Remote Monitoring System consists of gamma and neutron radiation sensors, RF systems, and video systems integrated into a coherent functioning whole. All sensor data communicate over an Echelon LonWorks Network to a single data logger. The Neumann DCM 14 video module is integrated into the Remote Monitoring System. All sensor and image data are stored on a Data Acquisition System (DAS) and archived and reviewed on a Data and Image Review Station (DIRS). Conventional phone lines are used as the telecommunications link to transmit on-site collected data and images to remote locations. The data and images are authenticated before transmission. Data review stations will be installed at ARN in Buenos Aires, Argentina, ABACC in Rio De Janeiro, IAEA Headquarters in Vienna, and Sandia National Laboratories in Albuquerque, New Mexico. 2 refs., 2 figs

  7. Assesment of Carbon Credits for Power Generation Systems at GSM Base Station Site

    OpenAIRE

    Ani, Vincent Anayochukwu; Ani, Emmanuel Onyeka

    2016-01-01

    Electricity production is often a source of CO2 emissions, for instance when fossil fuel is combusted in power plants. Therefore the root cause of pollution coming from telecommunication industry is the source of energy (diesel genset) the network operators used in running their Base station sites. Energy consumption of using diesel to power base station by telecom networks is a contributor to global greenhouse gas (GHG) emissions. This paper presents the comparative carbon credits of hybrid ...

  8. Site characterization activities at Stripa and other Swedish projects

    International Nuclear Information System (INIS)

    Ahlstroehm, P.E.

    1991-01-01

    The Swedish research programme concerning spent nuclear fuel disposal aims for submitting a siting license application around the year 2000. An important step towards that goal will be the detailed characterization of at least two potential sites in late 1990s. In preparation for such characterization several research projects are conducted. One is the international Stripa Project that includes a site characterization and validation project for a small size granite rock body. The Stripa work also includes further development of instrumentation and measurement techniques. Another project is the Finnsjoen Fracture Zone Project, which is characterizing a subhorizontal zone at depths from 100 to 350 meters. The third project is the new Swedish Hard Rock Laboratory planned at the site of the Oskarshamn nuclear power plant. The preinvestigations and construction of this laboratory include major efforts in development, application and validation of site characterization methodology. (author) 6 figs., 9 refs

  9. A collaborative network middleware project by Lambda Station, TeraPaths, and Phoebus

    International Nuclear Information System (INIS)

    Bobyshev, A.; Bradley, S.; Crawford, M.; DeMar, P.; Katramatos, D.; Shroff, K.; Swany, M.; Yu, D.

    2010-01-01

    The TeraPaths, Lambda Station, and Phoebus projects, funded by the US Department of Energy, have successfully developed network middleware services that establish on-demand and manage true end-to-end, Quality-of-Service (QoS) aware, virtual network paths across multiple administrative network domains, select network paths and gracefully reroute traffic over these dynamic paths, and streamline traffic between packet and circuit networks using transparent gateways. These services improve network QoS and performance for applications, playing a critical role in the effective use of emerging dynamic circuit network services. They provide interfaces to applications, such as dCache SRM, translate network service requests into network device configurations, and coordinate with each other to setup up end-to-end network paths. The End Site Control Plane Subsystem (ESCPS) builds upon the success of the three projects by combining their individual capabilities into the next generation of network middleware. ESCPS addresses challenges such as cross-domain control plane signalling and interoperability, authentication and authorization in a Grid environment, topology discovery, and dynamic status tracking. The new network middleware will take full advantage of the perfSONAR monitoring infrastructure and the Inter-Domain Control plane efforts and will be deployed and fully vetted in the Large Hadron Collider data movement environment.

  10. Resource Conservation and Recovery Act Industrial Sites quality assurance project plan: Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    1994-06-01

    This quality assurance project plan (QAPjP) describes the measures that shall be taken to ensure that the environmental data collected during characterization and closure activities of Resource Conservation and Recovery Act (RCRA) Industrial Sites at the Nevada Test Site (NTS) are meaningful, valid, defensible, and can be used to achieve project objectives. These activities are conducted by the US Department of Energy Nevada Operations Office (DOE/NV) under the Nevada Environmental Restoration (ER) Project. The Nevada ER Project consists of environmental restoration activities on the NTS, Tonopah Test Range, Nellis Air Force Range, and eight sites in five other states. The RCRA Industrial Sites subproject constitutes a component of the Nevada ER Project. Currently, this QAPjP is limited to the seven RCRA Industrial Sites identified within this document that are to be closed under an interim status and pertains to all field- investigation, analytical-laboratory, and data-review activities in support of these closures. The information presented here supplements the RCRA Industrial Sites Project Management Plan and is to be used in conjunction with the site-specific subproject sampling and analysis plans

  11. Remaining Sites Verification Package for 132-DR-1, 1608-DR Effluent Pumping Station. Attachment to Waste Site Reclassification Form 2005-035

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2005-01-01

    Radiological characterization, decommissioning and demolition of the 132-DR-1 site, 1608-DR Effluent Pumping Station was performed in 1987. The current site conditions achieve the remedial action objectives and the corresponding remedial action goals established in the Remaining Sites ROD. Residual concentrations support future land uses that can be represented by a rural-residential scenario and pose no threat to groundwater or the Columbia River based on RESRAD modeling

  12. New safety standards of nuclear power station with no requirements of site evaluation. No public dose limit published with possible inappropriateness of reactor site

    International Nuclear Information System (INIS)

    Takitani, Koichi

    2013-01-01

    Nuclear Regulation Authority was preparing new safety standards in order to aim at starting safety reviews of existing nuclear power station in July 2013. This article commented on issues of major accident, which was defined as severely damaged core event. Accumulated dose at the site boundary of the Fukushima Daiichi Nuclear Power Station totaled to about 234 mSv on March just after the accident with rare gas of 500 PBq, iodine 131 of 500 PBq, cesium 134 of 10 PBq and cesium 137 of 10 PBq released to the atmosphere, which was beyond 100 mSv. As measures for preventing containment vessel failure after core severely damaged, filtered venting system was required to be installed for low radiological risk to the public. However filter was not effective to rare gas. Accumulated doses at the site boundary of several nuclear power stations after filtered venting with 100% release of rare gas could be estimated to be 2-37 Sv mostly depending on the site condition, which might be surely greater than 100 mSv. Omitting site evaluation for major accident, which was beyond design basis accident, was great concern. (T. Tanaka)

  13. Evaluating meteorological data from weather stations, and from satellites and global models for a multi-site epidemiological study.

    Science.gov (United States)

    Colston, Josh M; Ahmed, Tahmeed; Mahopo, Cloupas; Kang, Gagandeep; Kosek, Margaret; de Sousa Junior, Francisco; Shrestha, Prakash Sunder; Svensen, Erling; Turab, Ali; Zaitchik, Benjamin

    2018-04-21

    Longitudinal and time series analyses are needed to characterize the associations between hydrometeorological parameters and health outcomes. Earth Observation (EO) climate data products derived from satellites and global model-based reanalysis have the potential to be used as surrogates in situations and locations where weather-station based observations are inadequate or incomplete. However, these products often lack direct evaluation at specific sites of epidemiological interest. Standard evaluation metrics of correlation, agreement, bias and error were applied to a set of ten hydrometeorological variables extracted from two quasi-global, commonly used climate data products - the Global Land Data Assimilation System (GLDAS) and Climate Hazards Group InfraRed Precipitation with Stations (CHIRPS) - to evaluate their performance relative to weather-station derived estimates at the specific geographic locations of the eight sites in a multi-site cohort study. These metrics were calculated for both daily estimates and 7-day averages and for a rotavirus-peak-season subset. Then the variables from the two sources were each used as predictors in longitudinal regression models to test their association with rotavirus infection in the cohort after adjusting for covariates. The availability and completeness of station-based validation data varied depending on the variable and study site. The performance of the two gridded climate models varied considerably within the same location and for the same variable across locations, according to different evaluation criteria and for the peak-season compared to the full dataset in ways that showed no obvious pattern. They also differed in the statistical significance of their association with the rotavirus outcome. For some variables, the station-based records showed a strong association while the EO-derived estimates showed none, while for others, the opposite was true. Researchers wishing to utilize publicly available climate data

  14. Operational radio interferometry observation network (ORION) mobile VLBI station. [for NASA Crustal Dynamics Project

    Science.gov (United States)

    Renzetti, N. A.; Vegos, C. J.; Parks, G. S.; Sniffin, R. W.; Gannon, D. L.; Nishimura, H. G.; Clements, P. A.; Mckinney, R. P.; Menninger, F. J.; Vandenberg, N. R.

    1983-01-01

    The design and current status of the ORION mobile VLBI station is described. The station consists of a five-meter antenna, a receiving and recording system installed in a mobile antenna transporter, and an electronics transporter. The station is designed for field operation by a two-person crew at the rate of two sites per week. The various subsystems are described in detail, including the antenna, housing facilities for electronics and crew, microwave equipment, receiver, data acquisition subsystem, frequency and timing subsystem, phase calibration, monitoring and control, water vapor radiometer, and communications.

  15. Site observational work plan for the UMTRA Project site at Spook, Wyoming

    International Nuclear Information System (INIS)

    1995-05-01

    The Spook, Wyoming, site observational work plan proposes site-specific activities to achieve compliance with Subpart B of 40 CFR Part 192 (1994) of the final US Environmental Protection Agency (EPA) ground water protection standards 60 FR 2854 (1995) at this Uranium Mill Tailing Remedial Action (UMTRA) Project site. This draft SOWP presents a comprehensive summary of existing site characterization data, a conceptual site model of the nature and extent of ground water contamination, exposure pathways, and potential impact to human health and the environment. Section 2.0 describes the requirements for meeting ground water standards at UMTRA Project sites. Section 3.0 defines past and current conditions, describes potential environmental and human health risks, and provides site-specific data that supports the selection of a proposed ground water compliance strategy. Section 4.0 provides the justification for selecting the proposed ground water compliance strategy based on the framework defined in the ground water programmatic environmental impact statement (PEIS)

  16. Site observational work plan for the UMTRA Project site at Falls City, Texas

    International Nuclear Information System (INIS)

    1995-06-01

    Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy

  17. NASA space geodesy program: Catalogue of site information

    Science.gov (United States)

    Bryant, M. A.; Noll, C. E.

    1993-01-01

    This is the first edition of the NASA Space Geodesy Program: Catalogue of Site Information. This catalogue supersedes all previous versions of the Crustal Dynamics Project: Catalogue of Site Information, last published in May 1989. This document is prepared under the direction of the Space Geodesy and Altimetry Projects Office (SGAPO), Code 920.1, Goddard Space Flight Center. SGAPO has assumed the responsibilities of the Crustal Dynamics Project, which officially ended December 31, 1991. The catalog contains information on all NASA supported sites as well as sites from cooperating international partners. This catalog is designed to provde descriptions and occupation histories of high-accuracy geodetic measuring sites employing space-related techniques. The emphasis of the catalog has been in the past, and continues to be with this edition, station information for facilities and remote locations utilizing the Satellite Laser Ranging (SLR), Lunar Laser Ranging (LLR), and Very Long Baseline Interferometry (VLBI) techniques. With the proliferation of high-quality Global Positioning System (GPS) receivers and Doppler Orbitography and Radiopositioning Integrated by Satellite (DORIS) transponders, many co-located at established SLR and VLBI observatories, the requirement for accurate station and localized survey information for an ever broadening base of scientists and engineers has been recognized. It is our objective to provide accurate station information to scientific groups interested in these facilities.

  18. Site identification presentation: Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    1979-11-01

    The final step in the site identification process for the Basalt Waste Isolation Project is described. The candidate sites are identified. The site identification methodology is presented. The general objectives which must be met in selecting the final site are listed. Considerations used in the screening process are also listed. Summary tables of the guidelines used are included

  19. [Shippingport Station Decommissioning Project]: FY 1987 annual progress report, October 1, 1986-September 30, 1987

    International Nuclear Information System (INIS)

    1988-01-01

    This report presents progress on the Shippingport Station Decommissioning Project for FY 1987. There are two main topics: Project Management and Decommissioning Project Activities. Changes from technical and managerial concepts developed in the original Decommissioning Plan are presented with the related technical, economic, or schedule considerations. 3 refs., 9 figs., 4 tabs

  20. Shippingport Station Decommissioning Project: FY 1988 annual progress report, October 1, 1987--September 30, 1988

    International Nuclear Information System (INIS)

    1989-01-01

    This report presents progress on the Shippingport Station Decommissioning Project for FY 1988. There are two main topics: Project Management and Decommissioning Project Activities. Changes from technical and managerial concepts developed in the original Decommissioning Plan are presented with the related technical, economic, or schedular considerations. 4 refs., 17 figs., 2 tabs

  1. Site 300 hazardous-waste-assessment project. Interim report: December 1981. Preliminary site reconnaissance and project work plan

    International Nuclear Information System (INIS)

    Raber, E.; Helm, D.; Carpenter, D.; Peifer, D.; Sweeney, J.

    1982-01-01

    This document was prepared to outline the scope and objectives of the Hazardous Waste Assessment Project (HWAP) at Site 300. This project was initiated in October, 1981, to investigate the existing solid waste landfills in an effort to satisfy regulatory guidelines and assess the potential for ground-water contamination. This involves a site-specific investigation (utilizing geology, hydrology, geophysics and geochemistry) with the goal of developing an effective ground-water quality monitoring network. Initial site reconnaissance work has begun and we report the results, to date, of our geologic hydrogeologic studies. All known solid waste disposal locations are underlain by rocks of either the Late Miocene Neroly Formation or the Cierbo Formation, both of which are dominantly sandstones interbedded with shale and claystone. The existence of a regional confined (artesian) aquifer, as well as a regional water-table aquifer is postulated for Site 300. Preliminary analysis has led to an understanding of directions and depths of regional ground-water flow

  2. Site observational work plan for the UMTRA Project Site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1996-03-01

    The U.S. Department of Energy (DOE) has prepared this initial site observational work plan (SOWP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This SOWP is one of the first UMTRA Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards (40 CFR Part 192, as amended by 60 FR 2854) for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement (PEIS). This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The DOE goal is to use the observational method to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation based on the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards

  3. Yucca Mountain Project Site Atlas: Volume 1: Draft

    International Nuclear Information System (INIS)

    1988-10-01

    The Nevada Nuclear Waste Storage Investigations (NNWSI) Project Site Atlas is a reference document of field activities which have been, or are being, conducted by the US Department of Energy (DOE) to support investigations of Yucca Mountain as a potential site for an underground repository for high-level radioactive waste. These investigations, as well as future investigations, will yield geologic, geophysical, geochemical, geomechanical, hydrologic, volcanic, seismic, and environmental data necessary to characterize Yucca Mountain and its regional setting. This chapter summarizes the background of the NNWSI Project and the objective, scope, structure, and preparation of the Site Atlas. Chapter 2 describes in more detail the bibliography and map portfolio portions of the Atlas, which are presented in Chapter 4 and Volume 2, respectively. Chapter 3 describes how to use the Atlas. The objective of the Site Atlas is to create a management tool for the DOE Waste Management Project Office (WMPO) that will allow the WMPO to compile and disseminate information regarding the location of NNWSI Project field investigations, and document the permits acquired and the environmental, archaeological, and socioeconomic surveys conducted to support those investigations. The information contained in the Atlas will serve as a historical reference of site investigation field activities. A companion document to the Atlas is the NNWSI Project Surface Based Investigations Plan (SBIP)

  4. Nuclear power station siting experience in the United Kingdom: past and present and proposals for the future

    International Nuclear Information System (INIS)

    Haire, T.P.; Usher, E.F.F.W.

    1975-01-01

    Foremost of the many factors in site selection considerations are population distribution, cooling-water availability and amenity. Others are safety of potable water sources, geological stability and the risk of external hazards. Where cooling-water supplies are a limiting factor, the choica of reactor system is of major importance. To determine as early as possible the effect a station might have on its environment, desk studies, visual surveys and wind-tunnel tests are carried out. The Central Electricity Generating Board places great importance on obtaining the fullest degree of acceptance by the public for its nuclear stations and ensures that full consultation is provided with the relevant authorities at all stages of power-station development. It also provides public exhibitions, public meetings and liaison with the local inhabitants. Recruitment of station staff where possible from the immediate area of the station and formation of sports and social clubs are two of the practical steps which help to integrate the station into the local community. Whilst the current energy crisis has reinforced the need for a substantial nuclear programme, possible ways of further reducing the impact of nuclear stations on the environment are being considered. The paper concludes that sufficient nuclear sites can be provided for future needs but that continuing effort will be required to ensure public acceptance. (author)

  5. Site of the First Spanish Nuclear Power Stations; Los Emplazamientos de las Primeras Centrales Nucleares Espanolas

    Energy Technology Data Exchange (ETDEWEB)

    Pascual, F.; Alonso, A.; Norena, S.; Sevilla, A. [Junta de Energia Nuclear, Madrid (Spain)

    1967-09-15

    The authors analyse and describe the sites of three Spanish nuclear power stations: the Zorita station (153 M W (e )) with a pressurized water reactor and single containment; the Santa Marfa de Garofia station (380 MW (e)), with a boiling water reactor and containment by steam condensation; and the Vandellos station (480 MW(e)), with a graphite-moderated gas-cooled reactor and integrated design of the EDF-4 type. The first two are located in the interior of the country and the third on the Mediterranean coast. The paper discusses the normal criteria and the safety considerations governing the choice of site, and points out the influence of Spanish orography on the transport of heavy equipment and hence its repercussions on the selection of power station sites. Reference is made to the experience acquired in transporting equipment for the Z-orita plant, and an analysis of the practical difficulties encountered in applying particular safety standards to the sites of stations of different types and designs is included. As the type of reactor and its containment system affect the practical value of applying particular standards which, moreover, have to be adapted to the special features of each country, safety standards for assessing power station sites should be applied in an appropriate and flexible manner. The paper describes the geological and meteorological features of the three sites and summarizes the studies carried out in these fields. It refers particularly to the hydrological studies carried out at Zorita and Santa Maria de Garofia and describes the weather stations set up at both sites, the diffusion experiments with neutcal-buoyancy balloons at Santa Maria de Garofia, and the results of these investigations. (author) [Spanish] Se analizan y describen los emplazamientos de tres centrales nucleares espanolas: la central de Zorita, de 153 MW(e), con reactor de agua a presion y sistema de contencion simple; la central de Santa Maria de Garofia, de 380 MW

  6. Northeast Oregon Hatchery Project, Final Siting Report.

    Energy Technology Data Exchange (ETDEWEB)

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  7. Principal facts for about 16,000 gravity stations in the Nevada Test Site and vicinity

    International Nuclear Information System (INIS)

    Harris, R.N.; Ponce, D.A.; Oliver, H.W.; Healey, D.L.

    1989-01-01

    The Nevada Test Site (NTS) and vicinity includes portions of the Goldfield, Caliente, Death Valley, and Las Vegas. This report documents and consolidates previously published and recently compiled gravity data to establish a gravity data base of about 16,000 stations for the NTS and vicinity. While compiling data sets, redundant stations and stations having doubtful locations or gravity values were excluded. Details of compiling the gravity data sets are discussed in later sections. Where feasible, an accuracy code has been assigned to each station so that the accuracy or reliability of each station can be evaluated. This data base was used in preparing complete Bouguer and isostatic gravity maps of the NTS and vicinity. Since publication of the complete Bouguer gravity map, additional data were incorporated into the isostatic gravity map. Gravity data were compiled from five sources: 14,183 stations from the US Geological Survey (USGS), 326 stations from Exploration Data Consultants (EDCON) of Denver, Colorado, 906 stations from the Los Alamos National Laboratory (LANL), 212 stations from the University of Texas at Dallas (UTD), and 48 stations from the Defense Mapping Agency (DMA). This investigation is an effort to study several areas for potential storage of high-level radioactive waste. Gravity stations established under YMP are shown. The objective of this gravity survey was to explore for the presence of plutons. This volume contains only compiled data

  8. Principal facts for about 16,000 gravity stations in the Nevada Test Site and vicinity

    International Nuclear Information System (INIS)

    Harris, R.N.; Ponce, D.A.; Oliver, H.W.; Healey, D.L.

    1989-01-01

    The Nevada Test Site (NTS) and vicinity includes portions of the Goldfield, Caliente, Death Valley, and Las Vegas. This report documents and consolidates previously published and recently compiled gravity data to establish a gravity data base of about 16,000 stations for the NTS and vicinity. While compiling data sets, redundant stations and stations having doubtful locations or gravity values were excluded. Details of compiling the gravity data sets are discussed in later sections. Where feasible, an accuracy code has been assigned to each station so that the accuracy or reliability of each station can be evaluated. This data base was used in preparing complete Bouguer and isostatic gravity maps of the NTS and vicinity. Since publication of the complete Bouguer gravity map, additional data were incorporated into the isostatic gravity map. Gravity data were compiled from five sources: 14,183 stations from the US Geological Survey (USGS), 326 stations from Exploration Data Consultants (EDCON) of Denver, Colorado, 906 stations from the Los Alamos National Laboratory (LANL), 212 stations from the University of Texas at Dallas (UTD), and 48 stations from the Defense Mapping Agency (DMA). This investigation is an effort to study several areas for potential storage of high-level radioactive waste. Gravity stations established under YMP are shown. The objective of this gravity survey was to explore for the presence of plutons. 33 refs., 24 figs., 9 tabs

  9. Yucca Mountain Site characterization project bibliography, January--June 1991

    International Nuclear Information System (INIS)

    1992-06-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Science and Technology Database from January 1, 1990, through December 31, 1991

  10. Potential Release Site Sediment Concentrations Correlated to Storm Water Station Runoff through GIS Modeling

    International Nuclear Information System (INIS)

    McLean, C.T.

    2005-01-01

    This research examined the relationship between sediment sample data taken at Potential Release Sites (PRSs) and storm water samples taken at selected sites in and around Los Alamos National Laboratory (LANL). The PRSs had been evaluated for erosion potential and a matrix scoring system implemented. It was assumed that there would be a stronger relationship between the high erosion PRSs and the storm water samples. To establish the relationship, the research was broken into two areas. The first area was raster-based modeling, and the second area was data analysis utilizing the raster based modeling results and the sediment and storm water sample results. Two geodatabases were created utilizing raster modeling functions and the Arc Hydro program. The geodatabase created using only Arc Hydro functions contains very fine catchment drainage areas in association with the geometric network and can be used for future contaminant tracking. The second geodatabase contains sub-watersheds for all storm water stations used in the study along with a geometric network. The second area of the study focused on data analysis. The analytical sediment data table was joined to the PRSs spatial data in ArcMap. All PRSs and PRSs with high erosion potential were joined separately to create two datasets for each of 14 analytes. Only the PRSs above the background value were retained. The storm water station spatial data were joined to the table of analyte values that were either greater than the National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit (MSGP) benchmark value, or the Department of Energy (DOE) Drinking Water Defined Contribution Guideline (DWDCG). Only the storm water stations were retained that had sample values greater than the NPDES MSGP benchmark value or the DOE DWDCG. Separate maps were created for each analyte showing the sub-watersheds, the PRSs over background, and the storm water stations greater than the NPDES MSGP benchmark value or the

  11. Hydrocarbon impacts and remedial action at an active service station

    Energy Technology Data Exchange (ETDEWEB)

    Haidar, S.A. [Keystone Environmental, Burnaby, BC (Canada); Linke, J. [Chevron Canada Ltd., Vancouver, BC (Canada)

    2006-07-01

    This presentation discussed a project that examined the hydrocarbon impacts and remedial action at an active service station. The presentation identified the project partners, discussed the background on the project and project goals. Chevron Canada was the site involved in the study and Keystone Environmental was responsible for testing soil samples, developing the detailed conceptual site model, and for conducting indoor air quality monitoring. The presentation also provided illustrations of the site layout, investigated areas, and soil and groundwater plume. The evaluation and selection of remedial options were also discussed as well as other project planning activities such as assembling the project team, obtaining agreement with stakeholders, and coordinating with the municipality, utility companies, residents, and neighbours. Remediation efforts that were described and illustrated in the presentation included: underpinning and shoring; excavation; and, barrier wall installation. Last, post remediation activities were identified including the installation of post remediation confirmatory wells; reinstating structures; reinstating rear yards, fences, and garages; reconnecting utilities; performance monitoring of barrier wall; and, preparing closure reports for certificates of compliance on off-site properties. 6 figs.

  12. Mock Site Licensing Demonstration Project. Final report

    International Nuclear Information System (INIS)

    Roop, R.D.

    1986-06-01

    The Mock Site Licensing Demonstration Project developed the Low-Level Radioactive Waste Siting Simulation, a role-playing exercise designed to facilitate the process of siting and licensing disposal facilities for low-level waste (LLW). This report describes the development, contant, and usefulness of the siting simulation. The simulation was designed by Harvard University's Program on Negotiation; it can be conducted at a workshop or conference, involves 14 or more participants, and requires about eight hours to complete. The simulation consists of two sessions. In the first, participants negotiate the selection of siting criteria, and in the second, a preferred site for a facility is chosen from three candidate sites. The project sponsored two workshops (in Boston, Massachusetts and Richmond, Virginia) in which the simulation was conducted for persons involved in planning for LLW. It is concluded that the siting simulation can be useful in three ways: (1) as a tool for information dissemination, (2) as a vehicle that can foste communication among parties in conflict, and (3) as a step toward consensus building and conflict resolution. The DOE National Low-Level Waste Management Program is now making the siting simulation available for use by states, regional compacts, and other organizations involved in development of LLW disposal facilities

  13. Allowable Residual Contamination Levels in soil for decommissioning the Shippingport Atomic Power Station site

    International Nuclear Information System (INIS)

    Kennedy, W.E. Jr.; Napier, B.A.; Soldat, J.K.

    1983-09-01

    As part of decommissioning the Shippingport Atomic Power Station, a fundamental concern is the determination of Allowable Residual Contamination Levels (ARCL) for radionuclides in the soil at the site. The ARCL method described in this report is based on a scenario/exposure-pathway analysis and compliance with an annual dose limit for unrestricted use of the land after decommissioning. In addition to naturally occurring radionuclides and fallout from weapons testing, soil contamination could potentially come from five other sources. These include operation of the Shippingport Station as a pressurized water reactor, operations of the Shippingport Station as a light-water breeder, operation of the nearby Beaver Valley reactors, releases during decommissioning, and operation of other nearby industries, including the Bruce-Mansfield coal-fired power plants. ARCL values are presented for 29 individual radionculides and a worksheet is provided so that ARCL values can be determined for any mixture of the individual radionuclides for any annual dose limit selected. In addition, a worksheet is provided for calculating present time soil concentration value that will decay to the ARCL values after any selected period of time, such as would occur during a period of restricted access. The ARCL results are presented for both unconfined (surface) and confined (subsurface) soil contamination. The ARCL method and results described in this report provide a flexible means of determining unrestricted-use site release conditions after decommissioning the Shippingport Atomic Power Station

  14. Steam Pressure-Reducing Station Safety and Energy Efficiency Improvement Project

    Energy Technology Data Exchange (ETDEWEB)

    Lower, Mark D [ORNL; Christopher, Timothy W [ORNL; Oland, C Barry [ORNL

    2011-06-01

    The Facilities and Operations (F&O) Directorate is sponsoring a continuous process improvement (CPI) program. Its purpose is to stimulate, promote, and sustain a culture of improvement throughout all levels of the organization. The CPI program ensures that a scientific and repeatable process exists for improving the delivery of F&O products and services in support of Oak Ridge National Laboratory (ORNL) Management Systems. Strategic objectives of the CPI program include achieving excellence in laboratory operations in the areas of safety, health, and the environment. Identifying and promoting opportunities for achieving the following critical outcomes are important business goals of the CPI program: improved safety performance; process focused on consumer needs; modern and secure campus; flexibility to respond to changing laboratory needs; bench strength for the future; and elimination of legacy issues. The Steam Pressure-Reducing Station (SPRS) Safety and Energy Efficiency Improvement Project, which is under the CPI program, focuses on maintaining and upgrading SPRSs that are part of the ORNL steam distribution network. This steam pipe network transports steam produced at the ORNL steam plant to many buildings in the main campus site. The SPRS Safety and Energy Efficiency Improvement Project promotes excellence in laboratory operations by (1) improving personnel safety, (2) decreasing fuel consumption through improved steam system energy efficiency, and (3) achieving compliance with applicable worker health and safety requirements. The SPRS Safety and Energy Efficiency Improvement Project being performed by F&O is helping ORNL improve both energy efficiency and worker safety by modifying, maintaining, and repairing SPRSs. Since work began in 2006, numerous energy-wasting steam leaks have been eliminated, heat losses from uninsulated steam pipe surfaces have been reduced, and deficient pressure retaining components have been replaced. These improvements helped ORNL

  15. Socioeconomic impacts: nuclear power station siting

    International Nuclear Information System (INIS)

    1977-06-01

    The rural industrial development literature is used to gain insights on the socioeconomic effects of nuclear power stations. Previous studies of large industrial facilities in small towns have important implications for attempts to understand and anticipate the impacts of nuclear stations. Even a cursory review of the nuclear development literature, however, reveals that industrialization research in rural sociology, economic geography and agricultural economics has been largely ignored

  16. Area 5 Site characterization project report, FY 1994

    International Nuclear Information System (INIS)

    Albright, W.; Tyler, S.; Chapman, J.; Miller, M.; Estrella, R.

    1994-09-01

    The Area 5 Site Characterization Project is designed to determine the suitability of the Radioactive Waste Management Site (RWMS) for disposal of low-level waste (LLW), mixed waste (MW) and transuranic waste (TRU). The Desert Research institute (DRI) has conducted this study for the Area 5 Site Characterization Project for the US Department of Energy, Nevada Operations Office (DOE/NV), Waste Management Division (WMD). The purpose of DRI's Area 5 Site Characterization Project is to characterize important properties of the upper vadose zone which influence infiltration and redistribution of water and transport of solutes as well as to characterize the water quality and hydrologic conditions of the uppermost aquifer. This report describes methods and presents a summary of all data and results from laboratory physical and chemical testing from borehole samples through September 1994. DRI laboratories performed soil water content, soil water potential, soil bulk density, and soil water extract isotope analyses

  17. Shippingport Station Decommissioning Project: FY 1986 annual progress report, October 1, 1985 through September 30, 1986

    International Nuclear Information System (INIS)

    1987-01-01

    This report presents progress on the Shippingport Station Decommissioning Project for FY 1986. There are two main topics: Project Management and Decommissioning Project Activities. Changes from technical and managerial concepts developed in the original Decommissioning Plan are presented with the related technical, economic, or schedule considerations. 9 refs., 4 figs., 3 tabs

  18. Site classification for National Strong Motion Observation Network System (NSMONS) stations in China using an empirical H/V spectral ratio method

    Science.gov (United States)

    Ji, Kun; Ren, Yefei; Wen, Ruizhi

    2017-10-01

    Reliable site classification of the stations of the China National Strong Motion Observation Network System (NSMONS) has not yet been assigned because of lacking borehole data. This study used an empirical horizontal-to-vertical (H/V) spectral ratio (hereafter, HVSR) site classification method to overcome this problem. First, according to their borehole data, stations selected from KiK-net in Japan were individually assigned a site class (CL-I, CL-II, or CL-III), which is defined in the Chinese seismic code. Then, the mean HVSR curve for each site class was computed using strong motion recordings captured during the period 1996-2012. These curves were compared with those proposed by Zhao et al. (2006a) for four types of site classes (SC-I, SC-II, SC-III, and SC-IV) defined in the Japanese seismic code (JRA, 1980). It was found that an approximate range of the predominant period Tg could be identified by the predominant peak of the HVSR curve for the CL-I and SC-I sites, CL-II and SC-II sites, and CL-III and SC-III + SC-IV sites. Second, an empirical site classification method was proposed based on comprehensive consideration of peak period, amplitude, and shape of the HVSR curve. The selected stations from KiK-net were classified using the proposed method. The results showed that the success rates of the proposed method in identifying CL-I, CL-II, and CL-III sites were 63%, 64%, and 58% respectively. Finally, the HVSRs of 178 NSMONS stations were computed based on recordings from 2007 to 2015 and the sites classified using the proposed method. The mean HVSR curves were re-calculated for three site classes and compared with those from KiK-net data. It was found that both the peak period and the amplitude were similar for the mean HVSR curves derived from NSMONS classification results and KiK-net borehole data, implying the effectiveness of the proposed method in identifying different site classes. The classification results have good agreement with site classes

  19. Seismic velocity site characterization of 10 Arizona strong-motion recording stations by spectral analysis of surface wave dispersion

    Science.gov (United States)

    Kayen, Robert E.; Carkin, Brad A.; Corbett, Skye C.

    2017-10-19

    Vertical one-dimensional shear wave velocity (VS) profiles are presented for strong-motion sites in Arizona for a suite of stations surrounding the Palo Verde Nuclear Generating Station. The purpose of the study is to determine the detailed site velocity profile, the average velocity in the upper 30 meters of the profile (VS30), the average velocity for the entire profile (VSZ), and the National Earthquake Hazards Reduction Program (NEHRP) site classification. The VS profiles are estimated using a non-invasive continuous-sine-wave method for gathering the dispersion characteristics of surface waves. Shear wave velocity profiles were inverted from the averaged dispersion curves using three independent methods for comparison, and the root-mean-square combined coefficient of variation (COV) of the dispersion and inversion calculations are estimated for each site.

  20. Shippingport Station Decommissioning Project: FYs 1984-1985 annual progress report, October 1, 1983 through September 30, 1985

    International Nuclear Information System (INIS)

    1987-01-01

    This report presents progress on the Shippingport Station Decommissioning Project for FYs 1984-85. There are three main topics: project management, decommissioning project activities, and issues of concern. The project purpose is demonstration of nuclear plant decommissioning and dismantlement operations in an environment of current industry practices. 8 refs., 8 figs., 2 tabs

  1. Radiation safety assessment of mobile telephone base stations

    International Nuclear Information System (INIS)

    Mohd Yusof Mohd Ali; Mohd Anuar Majid; Mohd Amirul Nizam

    2002-01-01

    Mobile telephone is fast getting popular among users and in fact it has become one of the fastest selling electronic products in the world. More base stations are expected to be built to meet such high demands and this has caused great concerned among members of the public, especially those living close to the stations, about the potential harmful health effects of radiofrequency (RF) radiation produced by such facilities. A project was initiated by MINT in early 2000 with aims to assess the radiation levels present in the areas around the base stations and to establish baseline data on the pattern and trend of the radiation emission from each different set up of the facilities. This paper highlights some basics facts about mobile telephones and preliminary findings of the project. The assessment has been carried out at 16 base station sites and the results indicate that the radiation levels present around these sites are very low. Their broadband readings vary between below the detection limit of 0.3μWatts/cm 2 to 11 μWatts/cm 2 and they are comparable to normal background radiation present in places away from any base stations. The highest level observed was 1.5% of the exposure limit recommended for members of the public. However, locations at close distance in front of the the antenna can be very serious in term of radiation exposure since the radiation level here can easily exceed the permissible exposure limit for public. Safety precaution needs to be taken when entering these areas and they should be out of bound for members of the public. (Author)

  2. Site quality management of engineering projects

    International Nuclear Information System (INIS)

    Jiang Yiqun

    2008-01-01

    Site quality management of an engineering project of NPIC was introduced in this paper. Requirements on organization and management, interfaces, and management of interior and exterior communication were put forward, by description of quality planning, process management, process monitoring and summarizing for the engineering projects. By the management of personnel, specifications and procedures, and the control of equipment, material and work surroundings, not only the safety is ensured, but also the quality and schedule of the engineering project were guaranteed, and so the expected quality goals were achieved. (author)

  3. Determination of NEHRP Site Class of Seismic Recording Stations in the Northwest Himalayas and Its Adjoining Area Using HVSR Method

    Science.gov (United States)

    Harinarayan, N. H.; Kumar, Abhishek

    2018-01-01

    Local site characteristics play an important role in controlling the damage pattern during earthquakes (EQs). These site characteristics may vary from simple to complex and can be estimated by various field tests. In addition, extended Nakamura's method, which uses horizontal to vertical spectral ratio (HVSR) based on available EQ records also available for site class (SC) determination. In this study, SCs for 90 recording stations which are maintained by Program for Excellence in Strong Motion Studies (PESMOS), located in the northwestern Himalayas and the adjoining areas are determined using extended Nakamura's technique. Average HVSR curves obtained at majority of the recording stations are found matching with the existing literature. Predominant frequency ( f peak) from average HVSR curve at each recording station is then used for the determination of SC. Original SC given by PESMOS is purely based on geology and not based on comprehensive soil investigation exercise. In this study, the SC, which is based on the average HVSR curves is found matching with SC given by PESMOS for a majority of recording stations. However, for considerable number of recording stations, a mismatch is also found which is consistent with the existing literature. In addition, SC based on National Earthquake Hazard Reduction Program (NEHRP) scheme is proposed based on f peak for all the 90 recording stations.

  4. Site observational work plan for the UMTRA Project site at Riverton, Wyoming

    International Nuclear Information System (INIS)

    1994-09-01

    The site observational work plan (SOWP) for the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the first document for the UMTRA Ground Water Project to address site-specific activities to meet compliance with the U.S. Environmental Protection Agency (EPA) proposed ground water standards (52 FR 36000 (1987)). In support of the activities the regulatory framework and drivers are presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. A combination of the two compliance strategies that will be recommended for this site are no remediation with the application of alternate concentration levels (ACL) and natural flushing in conjunction with institutional controls. ACLs are to be applied to constituents that occur at concentrations above background levels but which are essential nutrients and occur within nutritional ranges and/or have very low toxicity and high dietary intake rates compared to the levels detected in the ground water. The essential premise of natural flushing is that ground water movement and natural attenuation processes will reduce the detected contamination to background levels within 1 00 years. These two recommended compliance strategies were evaluated by applying Riverton site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement. There are three aquifers beneath the site: a surficial unconfined aquifer, a middle semiconfined aquifer, and a deeper confined aquifer. The milling-related contamination at the site has affected both the surficial and semiconfined aquifers, although the leaky shale aquifers separating these units limits the downward migration of contamination into the semiconfined aquifer. A shale aquitard separates the semiconfined aquifer from the underlying confined aquifer which has not been contaminated by milling-related constituents

  5. Yucca Mountain Site characterization project bibliography, January--June 1991

    International Nuclear Information System (INIS)

    Lorenz, J.J.; Stephan, P.M.

    1991-09-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Energy Science and Technology Database from January 1991 through June 1991. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it

  6. Yucca Mountain Site Characterization Project bibliography, January--June 1992

    International Nuclear Information System (INIS)

    1992-01-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Energy Science and Technology Database from January 1, 1993, through June 30, 1993. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it

  7. Yucca Mountain Site Characterization Project Bibliography, July--December 1990

    International Nuclear Information System (INIS)

    1991-05-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountains Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Energy Science and Technology Database from July 1990 through December 1990. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers and articles are included in the sponsoring organizations list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it

  8. Yucca Mountain Site characterization project bibliography, January--June 1992

    International Nuclear Information System (INIS)

    1992-09-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Energy Science and Technology Database from January 1, 1992, through June 30, 1992. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor resorts, papers, and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it

  9. Wind Atlas for South Africa (WASA) Station and Site Description Report

    DEFF Research Database (Denmark)

    Mortensen, Niels Gylling; Hansen, Jens Carsten; Kelly, Mark C.

    As part of the “Wind Atlas for South Africa” project, site inspection trips were carried out by the Council for Scientific and Industrial Research (CSIR) and Risø DTU in April and June of 2011. A total of 10 sites featuring instrumented 60-m masts were visited; the present report summarises...

  10. Lambda Station: Alternate network path forwarding for production SciDAC applications

    International Nuclear Information System (INIS)

    Grigoriev, Maxim; Bobyshev, Andrey; Crawford, Matt; DeMar, Phil; Grigaliunas, Vyto; Moibenko, Alexander; Petravick, Don; Newman, Harvey; Steenberg, Conrad; Thomas, Michael

    2007-01-01

    The LHC era will start very soon, creating immense data volumes capable of demanding allocation of an entire network circuit for task-driven applications. Circuit-based alternate network paths are one solution to meeting the LHC high bandwidth network requirements. The Lambda Station project is aimed at addressing growing requirements for dynamic allocation of alternate network paths. Lambda Station facilitates the rerouting of designated traffic through site LAN infrastructure onto so-called 'high-impact' wide-area networks. The prototype Lambda Station developed with Service Oriented Architecture (SOA) approach in mind will be presented. Lambda Station has been successfully integrated into the production version of the Storage Resource Manager (SRM), and deployed at US CMS Tier1 center at Fermilab, as well as at US-CMS Tier-2 site at Caltech. This paper will discuss experiences using the prototype system with production SciDAC applications for data movement between Fermilab and Caltech. The architecture and design principles of the production version Lambda Station software, currently being implemented as Java based web services, will also be presented in this paper

  11. Site observational work plan for the UMTRA project site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1996-01-01

    This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer

  12. The SKI SITE-94 project approach to analyzing confidence in site-specific data

    International Nuclear Information System (INIS)

    Dverstorp, B.; Andersson, J.

    1995-01-01

    The ongoing SKI SITE-94 project is a fully integrated performance assessment based on a hypothetical repository at 500 m depth in crystalline rock. One main objective of the project is to develop a methodology for incorporating data from a site characterization into the performance assessment. The hypothetical repository is located at SKB's Hard Rock Laboratory at Aspo in south-eastern Sweden. The site evaluation in SITE-94 uses data from the pre-excavation phase that comprised measurements performed on the ground and in boreholes, including cross-hole hydraulic and tracer experiments. Uncertainties related to measurement technique, equipment and methods for interpretation were evaluated through a critical review of geohydraulic measurement methods and a complete re-evaluation of the hydraulic packer tests using the generalised radial flow (GRF) theory. Groundwater chemistry samples were analyzed for representativeness and sampling errors. A wide range of site models within geology, hydrogeology, geochemistry and rock mechanics has been developed and tested with the site characterization data. (authors). 10 refs., 3 figs., 2 tabs

  13. The Princess Elisabeth Station

    Science.gov (United States)

    Berte, Johan

    2012-01-01

    Aware of the increasing impact of human activities on the Earth system, Belgian Science Policy Office (Belspo) launched in 1997 a research programme in support of a sustainable development policy. This umbrella programme included the Belgian Scientific Programme on Antarctic Research. The International Polar Foundation, an organization led by the civil engineer and explorer Alain Hubert, was commissioned by the Belgian Federal government in 2004 to design, construct and operate a new Belgian Antarctic Research Station as an element under this umbrella programme. The station was to be designed as a central location for investigating the characteristic sequence of Antarctic geographical regions (polynia, coast, ice shelf, ice sheet, marginal mountain area and dry valleys, inland plateau) within a radius of 200 kilometers (approx.124 miles) of a selected site. The station was also to be designed as "state of the art" with respect to sustainable development, energy consumption, and waste disposal, with a minimum lifetime of 25 years. The goal of the project was to build a station and enable science. So first we needed some basic requirements, which I have listed here; plus we had to finance the station ourselves. Our most important requirement was that we decided to make it a zero emissions station. This was both a philosophical choice as we thought it more consistent with Antarctic Treaty obligations and it was also a logistical advantage. If you are using renewable energy sources, you do not have to bring in all the fuel.

  14. Lessons learned while implementing a safety parameter display system at the Comanche Peak steam electric station

    International Nuclear Information System (INIS)

    Hagar, B.

    1987-01-01

    With the completion of site Verification and Validation tests, the Safety Parameter Display System (SPDS) will be fully operational at the Comanche Peak Steam Electric Station. Implementation of the SPDS, which began in 1982, included: modifying generic Safety Assessment System Software; developing site-specific displays and features; installing and integrating system equipment into the plant; modifying station heating, ventilation, and air conditioning systems to provide necessary cooling; installing an additional uninterruptible power supply system to provide necessary power; and training station personnel in the operation and use of the system. Lessons learned during this project can be discussed in terms of an ideal SPDS implementation project. Such a project would design and implement an SPDS for a plant that is already under construction or operating, and would progress through a sequence of activities that includes: (1) developing and documenting the system design bases, and including all major design influences; (2) developing a database description and system functional specifications to clarify specific system requirements; (3) developing detailed system hardware and software design specifications to fully describe the system, and to enable identification of necessary site design changes early in the project; (4) implementing the system design; (5) configuring and extensively testing the system prior to routine system operation; and (6) tuning the system after the completion of system installation. The ideal project would include future system users in design development and system testing, and would use Verification and Validation techniques throughout the project to ensure that each sequential step is appropriate and correct

  15. Pn seismic wave travel time at the Semipalatinsk Test Site - Borovoe seismic station trace

    International Nuclear Information System (INIS)

    An, V.A.; Kaazik, P.B.; Ovchinnikov, V.M.

    2001-01-01

    This paper preparation involved 160 explosions at the Degelen Site conducted in 1961-1989 and 89 explosions at the Balapan Site conducted in 1968-1989. Pn wave travel time was tied to the sea level in accordance with velocity characteristics of the explosion hypocenter medium; and to average epicentral distance for every site basing on their local travel time curves of Pn wave relative to Borovoe station. Maximum amplitude of mean-year travel times variations is 0.3-0.5 s as at the Nevada Test Site - Borovoe trace and Mirniy (Antarctica). However, the linear trend in contrast to previous traces has negative sign (0.08 s for Degelen and 0.1 s for Balapan). Thus, Pn wave velocity increases with calendar time. (author)

  16. Siting and early-stage project management of nuclear power plant

    International Nuclear Information System (INIS)

    Wang Kai; Li Guojin

    2013-01-01

    In this paper, difficulties and challenges facing in siting of nuclear power plant after Fukushima nuclear accident is introduced. The key points for siting are analyzed. The site characteristics related to nuclear safety and the evaluated methods are discussed. From project management perspective, main procedures and key points for the early-stage of a nuclear power project are described. (authors)

  17. NASA Systems Autonomy Demonstration Project - Development of Space Station automation technology

    Science.gov (United States)

    Bull, John S.; Brown, Richard; Friedland, Peter; Wong, Carla M.; Bates, William

    1987-01-01

    A 1984 Congressional expansion of the 1958 National Aeronautics and Space Act mandated that NASA conduct programs, as part of the Space Station program, which will yield the U.S. material benefits, particularly in the areas of advanced automation and robotics systems. Demonstration programs are scheduled for automated systems such as the thermal control, expert system coordination of Station subsystems, and automation of multiple subsystems. The programs focus the R&D efforts and provide a gateway for transfer of technology to industry. The NASA Office of Aeronautics and Space Technology is responsible for directing, funding and evaluating the Systems Autonomy Demonstration Project, which will include simulated interactions between novice personnel and astronauts and several automated, expert subsystems to explore the effectiveness of the man-machine interface being developed. Features and progress on the TEXSYS prototype thermal control system expert system are outlined.

  18. Site Observational Work Plan for the UMTRA project site at Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1995-02-01

    Ground water compliance for the Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Ambrosia Lake, New Mexico, site, is governed by the Uranium Mills Tailings Radiation Control Act (42 USC section 7901 et seq.) and the U.S. Environmental Protection Agency's Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR Part 192; 60 FR 2854). The EPA standards describe specific conditions for which the U.S. Department of Energy (DOE) may apply for supplemental standards for contaminated ground water rather than meeting background levels or numerical standards. To achieve compliance with Subpart A of the EPA standards the residual radioactive materials are currently being consolidated on the site by the DOE in a disposal cell, isolating them from direct human or ecological contact and further dispersion into the environment. Completion of the disposal cell is scheduled for early 1995. An environmental assessment and a Finding of No Significant Impact (FONSI) were completed in 1987. Concurrence with the UMTRA Surface Project Ambrosia Lake remedial action plan (RAP) was granted by the U.S. Nuclear Regulatory Commission (NRC) and state of New Mexico in 1990. The DOE deferred compliance with Subpart B of the EPA standards in the Surface Project RAP. This site observational work plan (SOWP) is the first document to address ground water compliance under Subpart B at the Ambrosia Lake site. The Ambrosia Lake UMTRA Project site is within the Grants Mineral Belt and was one of numerous uranium mills supplied by many local mines. Ground water contamination at the site occurred as a result of uranium mill operations. Contamination of ground water resulted from discharge of waste water, infiltration of water through the tailings pile, hydraulic placement of mill tailings in nearby mines, and water pumped from mine shafts

  19. UMTRA [Uranium Mill Tailings Remedial Action] Project site management manual

    International Nuclear Information System (INIS)

    1990-10-01

    The purpose of this manual is to summarize the organizational interfaces and the technical approach used to manage the planning, design development, National Environmental Policy Act (NEPA) compliance, engineering, and remedial action required to stabilize and control the designated Uranium Mill Tailings Remedial Action (UMTRA) Project sites. This manual describes the Project's objective, participants' roles and responsibilities, technical approach for accomplishing the objective, and planning and managerial controls to be used in performing the site work. The narrative follows the flow of activities depicted in Figure 1.1, which provides the typical sequence of key Project activities. A list of acronyms used is presented at the end of the manual. The comparable manual for UMTRA Project vicinity properties is the ''Vicinity Properties Management and Implementation Manual'' (VPMIM) (UMTRA-DOE/AL-050601). Together, the two manuals cover the remedial action activities associated with UMTRA Project sites. The UMTRA Project's objective is to stabilize and control the uranium mill tailings, vicinity property materials, and other residual radioactive materials at the designated sites (Figure 1.2) in a safe and environmentally sound manner in order to minimize radiation health hazards to the public. 26 figs., 6 tabs

  20. Study of the legal problems raised by the siting of nuclear power stations in artificial islands

    International Nuclear Information System (INIS)

    Hebert, J.; Guieze, J.L.

    1975-01-01

    The creation and operation of a nuclear power station on an artificial island in French waters are governed by domestic law and are subject to two types of procedure: the first concerns erection of the artificial island and the second the control of the public authorities over creation and operation of the nuclear power station. At administrative level, the setting up of an artificial island requires that it be attached to a commune as well as permission for occupancy from the maritime authorities. Furthermore, setting up of a nuclear power station on an artificial island is subject to the licensing procedure for large nuclear installations and to delivery of the licenses required for release of gaseous and liquid radioactive effluents. Given the proximity of the high seas and eventually, the borders of other States, siting of a nuclear power station on an artificial island imposes obligations at international level. These requirements, which concern prevention of transfrontier pollution, stem from the London (1972) and Paris (1974) Conventions on marine pollution. The third party liability regime for a nuclear incident caused by an installation sited in territorial seas is that of the 1960 Paris Convention on third party liability in the nuclear field and the 1963 Brussels Supplementary Convention. Another problem likely to be raised is that of the right of innocent passage of ships near such installations [fr

  1. Site observational work plan for the UMTRA project site at Shiprock, New Mexico

    International Nuclear Information System (INIS)

    1994-09-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the initial document for developing site-specific activities to achieve regulatory compliance in the UMTRA Ground Water Project. The regulatory framework used to select the proposed ground water compliance strategies is presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. The Shiprock site consists of two, interconnected hydrogeologic systems: the terrace system and the floodplain system. Separate compliance strategies are proposed for these two systems. The compliance strategy for the terrace aquifer is no remediation with the application of supplemental standards based on classification of the terrace aquifer as having Class III (limited-use) ground water. The compliance strategy for the floodplain aquifer is active remediation using a subsurface biological barrier. These strategies were selected by applying site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement (PEIS) (DOE, 1994a). The site conceptual model indicates that milling-related contamination has impacted the ground water in the terrace and floodplain aquifers. Ground water occurs in both aquifers in alluvium and in fractures in the underlying Cretaceous age Mancos Shale. A mound of ground water related to fluids from the milling operations is thought to exist in the terrace aquifer below the area where settling ponds were in use during the mill operations. Most of the water occurring in the floodplain aquifer is from recharge from the San Juan River

  2. The Impact of Climatological Conditions on Low Enriched Uranium Loading Station Operations for the HEU Blend Down Project

    International Nuclear Information System (INIS)

    Chang, R.C.

    2002-01-01

    A computer model was developed using COREsim to perform a time motion study for the Low Enriched Uranium (LEU) Loading Station operations. The project is to blend Highly Enriched Uranium (HEU) with Natural Uranium (NU) to produce LEU to be shipped to Tennessee Valley Authority (TVA) for further processing. To cope with a project cost reduction, the LEU Loading Station concept has changed from an enclosed building with air-conditioning to a partially enclosed building without air conditioning. The LEU Loading Station is within a radiological contaminated area; two pairs of coveralls and negative pressure respirator are required. As a result, inclement weather conditions, especially heat stress, will affect and impact the LEU loading operations. The purposes of the study are to determine the climatological impacts on LEU Loading operations, resources required for committed throughputs, and to find out the optimum process pathways for multi crews working simultaneously in the space-lim ited LEU Loading Station

  3. POLLUTION PREVENTION OPPORTUNITY ASSESSMENT - UNITED STATES NAVAL BASE NORFOLK NAVAL AIR STATION

    Science.gov (United States)

    This report summarizes work conducted at the U.S. Navy's Naval Base Norfolk, Naval Air Station (NAS) located at Sewells Point in Norfolk, Virginia, under the U.S. Environmental Protection Agency's (EPA) Waste Reduction Evaluations at Federal Sites (WREAFS) Program. This project w...

  4. North Central Project: Environment act proposal

    International Nuclear Information System (INIS)

    1992-05-01

    Manitoba Hydro proposes to construct a power transmission and distribution line system to connect 12 northern Manitoba communities to the utility's central power grid. The purpose of this North Central Project (NCP) is to provide reliable and unrestricted electric service to remote communities now largely receiving limited diesel-generated power. The NCP is composed of a 138-kV transmission line running ca 350 km from the Kelsey Generating Station, ca 160 km of 25-kV distribution lines, new transformer stations at four communities, upgraded internal distribution systems within the communities, removal of existing diesel stations and restoration of the sites, modifications and additions to the Kelsey switchyard, and a communications system. The NCP is described in detail, including proposed line routes and transformer station locations, rationales for site and route selection, projected impacts on the environment and local societies, and consultations with the communities to be affected. Potential impacts are expected to be modest, with few unmitigable adverse impacts and a number of potentially significant positive benefits. Impact management measures are proposed to prevent or mitigate adverse effects and to create or enhance positive impacts such as local employment of native peoples. 49 figs., 1 tab

  5. Multi-criteria decision making on selection of solar–wind hybrid power station location: A case of China

    International Nuclear Information System (INIS)

    Yunna, Wu; Geng, Shuai

    2014-01-01

    Highlights: • We summarize the evaluation attributes from the perspective of project management. • The duties of roles are defined in the decision process. • The decision framework can provide various rankings of alternatives. • A China’s solar–wind hybrid power station location selection case is study. - Abstract: Site selection plays an important role in the entire life cycle of solar–wind hybrid power station (SWHPS) project and is worthy to further study. There are problems in the present researches: first, the SWHPS site evaluation results are difficult to be understood by the project managers due to the evaluations of SWHPS site are few from the perspective of project management. Second, the independence of experts is difficult to be protected since the undefined duties of roles in the evaluation process Third, the project managers cannot consider the alternatives thoroughly because that the evaluation result is single. Hence the innovativeness of this paper is as follows: first, the evaluation attributes of SWHPS site selection are summarized from the perspective of project management; second, the duties of roles in the decision process are defined; third, according to the principle of practicality, a decision framework of SWHPS site selection is built based on the analytic hierarchy process method, the merits of this decision framework are that it can provide various rankings of alternatives and is easy to be used. Finally, a case study of China demonstrates the effectiveness of decision framework

  6. Outdoor radon monitoring plan for the UMTRA Project sites

    International Nuclear Information System (INIS)

    1986-02-01

    This document describes the monitoring schedules and methods used to measure ambient radon concentrations around Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Radon monitoring at both processing sites and disposal sites is performed primarily for two reasons. The first, and foremost, of these is to provide a means to keep the off-site radon concentrations during the construction activities As Low As Reasonably Achievable (ALARA). The second purpose is to provide a basis for comparison with the EPA standards developed for the UMTRA Project. Radon monitoring data are also used to demonstrate compliance with ambient concentration standards and for public information due to concern about potential radiation releases during construction. 1 fig., 1 tab

  7. Site Observational Work Plan for the UMTRA Project Site at Shiprock, New Mexico. Revision

    International Nuclear Information System (INIS)

    1995-07-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is one of the first documents for developing an approach for achieving ground water compliance at the site. This SOWP applies Shiprock site information to a regulatory compliance framework, which identifies strategies for meeting ground water compliance at the site. The compliance framework was developed in the UMTRA ground water programmatic environmental impact statement

  8. Requirements and criteria for choosing sites suitable for the construction of nuclear installations and power stations

    International Nuclear Information System (INIS)

    1978-05-01

    The present document explains the selection criteria for areas in Italy suitable for the installation of nuclear power stations to be included in the 'National Site Map' provided for in Section 23 of Act No 393 of 2 August 1975. It represents the results of a thorough investigation into the various aspects of the problem of siting nuclear power stations, at the present stage of technology, taking into account the effect of the installations on the environment and the effect of the environment on the installations. The essential aim is to demonstrate that the requirements derived from these analyses, and on which there was full consultation with the other controlling bodies of European countries (in particular, France, Great Britain and West Germany) ensure the optimum choice of areas from the point of view of safety and public health. (author)

  9. Nevada Test Site Area 25. Radiological survey and cleanup project, 1974-1983. Final report

    International Nuclear Information System (INIS)

    McKnight, R.K.; Rosenberry, C.E.; Orcutt, J.A.

    1984-01-01

    This report describes radiological survey, decontamination and decommissioning of the Nevada Test Site (NTS) Area 25 facilities and land areas incorporated in the Nuclear Rocket Development Station (NRDS). Buildings, facilities and support systems used after 1959 for nuclear reactor and engine testing were surveyed for the presence of radioactive contamination. The cleanup was part of the Surplus Facilities Management Program funded by the Department of Energy's Richland Operations Office. The radiological survey portion of the project encompassed portable instrument surveys and removable contamination surveys (swipe) for alpha and beta plus gamma radiation contamination of facilities, equipment and land areas. Soil sampling was also accomplished. The majority of Area 25 facilities and land areas have been returned to unrestricted use. Remaining radiologically contaminated areas are posted with warning signs and barricades. 12 figures

  10. Site selection for controversial projects: reflections on the MRS experience

    International Nuclear Information System (INIS)

    Sigmon, E.B.; Marland, G.

    1987-01-01

    Projects for waste management, power production, and a host of other socially useful functions frequently falter because of local opposition. Students of the siting dilemma have prescribed accommodation of local interests through negotiation and compensation, but they offer little advice on the site selection itself. The negotiated compensation approach to siting frequently fails because localities refuse to negotiate. The authors argue that methods of site selection and developers' initial stance toward local communities affect communities' propensity to negotiate. Site selection strategies and their influence on project acceptability are examined, using the Department of Energy's Monitored Retrievable Storage proposal as a point of departure. 14 refs

  11. Waste management for Shippingport Station Decommissioning Project: Extended summary

    International Nuclear Information System (INIS)

    Mullee, G.R.; Schulmeister, A.R.

    1987-01-01

    The Shippingport Station (SSDP) is demonstrating that the techniques and methodologies of waste management, which are currently employed by the nuclear industry, provide adequate management and control of waste activities for the decommissioning of a large scale nuclear plant. The SSDP has some unique aspects in that as part of the objective to promote technology transfer, multiple subcontractors are being utilized in the project. The interfaces resulting from multiple subcontractors require additional controls. Effective control has been accomplished by the use of a process control and inventory system, coupled with personnel training in waste management activities. This report summarizes the waste management plan and provides a status of waste management activities for SSDP

  12. Outline of preparation construction of Shimane Nuclear Power Station No.3

    International Nuclear Information System (INIS)

    Oda, Yasuhiro; Sasaki, Yutaka; Matsukage, Shigeo; Kawahara, Kazufumi

    2004-01-01

    The preparation construction of Shimane Nuclear Power Station No.3 (No.3) started on 15th March in 2004. The main preparation construction consist of the site preparation, revetment works, breakwater works, production of blocks, flood-way and outlet works. The outline of the project is described by the time schedule of work, the cross section of site preparation, site, the revetment method used, the cross section of representative breakwater, structure style and improvement works of flood-way and outlet and content of each works. (S.Y.)

  13. Development of a site analysis tool for distributed wind projects

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, Shawn [The Cadmus Group, Inc., Waltham MA (United States)

    2012-02-28

    The Cadmus Group, Inc., in collaboration with the National Renewable Energy Laboratory (NREL) and Encraft, was awarded a grant from the Department of Energy (DOE) to develop a site analysis tool for distributed wind technologies. As the principal investigator for this project, Mr. Shawn Shaw was responsible for overall project management, direction, and technical approach. The product resulting from this project is the Distributed Wind Site Analysis Tool (DSAT), a software tool for analyzing proposed sites for distributed wind technology (DWT) systems. This user-friendly tool supports the long-term growth and stability of the DWT market by providing reliable, realistic estimates of site and system energy output and feasibility. DSAT-which is accessible online and requires no purchase or download of software-is available in two account types; Standard: This free account allows the user to analyze a limited number of sites and to produce a system performance report for each; and Professional: For a small annual fee users can analyze an unlimited number of sites, produce system performance reports, and generate other customizable reports containing key information such as visual influence and wind resources. The tool’s interactive maps allow users to create site models that incorporate the obstructions and terrain types present. Users can generate site reports immediately after entering the requisite site information. Ideally, this tool also educates users regarding good site selection and effective evaluation practices.

  14. Beaver Valley Power Station and Shippingport Atomic Power Station. 1984 Annual environmental report, radiological. Volume 2

    International Nuclear Information System (INIS)

    1985-01-01

    This report describes the Radiological Environmental Monitoring Program conducted during 1984 in the vicinity of the Beaver Valley Power Station and the Shippingport Atomic Power Station. The Radiological Environmental Program consists of on-site sampling of water and gaseous effluents and off-site monitoring of water, air, river sediments, soils, food pathway samples, and radiation levels in the vicinity of the site. This report discusses the results of this monitoring during 1984. The environmental program outlined in the Beaver Valley Power Station Technical Specifications was followed throughout 1984. The results of this environmental monitoring program show that Shippingport Atomic Power Station and Beaver Valley Power Station operations have not adversely affected the surrounding environment. 23 figs., 18 tabs

  15. Yucca Mountain site characteriztion project bibliography. Progress Report, 1994--1995

    International Nuclear Information System (INIS)

    1996-08-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project which was added to the Department of Energy's Energy Science and Technology Database from January 1, 1994, through December 31, 1995. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology database which were not sponsored by the project but have some relevance to it

  16. Yucca Mountain site characteriztion project bibliography. Progress Report, 1994--1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project which was added to the Department of Energy`s Energy Science and Technology Database from January 1, 1994, through December 31, 1995. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization`s list. Another section contains information about publications on the Energy Science and Technology database which were not sponsored by the project but have some relevance to it.

  17. Environmental Audit, Rifle, Gunnison and Grand Junction UMTRA Project Sites

    International Nuclear Information System (INIS)

    1991-08-01

    This report documents the results of the comprehensive baseline Environmental Audit completed for the Uranium Mill Tailings Remedial Action (UMTRA) sites at Grand Junction, Rifle, and Gunnison, Colorado. Included in the Audit were the actual abandoned mill sites, associated transportation and disposal cell facilities, and representative examples of the more than 4,000 known vicinity properties. Sites investigated include: Climax Mill Site, Truck/Train Haul Route, Cotter Transfer Station, Cheney Disposal Cell, Rifle Mill Sites (Old and New Rifle), Gunnison Mill Site, Vicinity Properties, and Estes Gulch and Proposed Landfill Site No. 1 Disposal Cells. The UMTRA Audit was a comprehensive baseline audit which considered all environmental programs and the activities associated with ongoing and planned remediation at the UMTRA sites listed above. Compliance with the National Environmental Policy Act (NEPA) was not considered during this investigation. The Audit Team looked at the following technical disciplines: air, surface water/drinking water, groundwater, soil/sediment/biota, waste management, toxic and chemical materials, quality assurance, radiation, inactive waste sites, and environmental management. 6 figs., 12 tabs

  18. Environmental Audit, Rifle, Gunnison and Grand Junction UMTRA Project Sites

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-08-01

    This report documents the results of the comprehensive baseline Environmental Audit completed for the Uranium Mill Tailings Remedial Action (UMTRA) sites at Grand Junction, Rifle, and Gunnison, Colorado. Included in the Audit were the actual abandoned mill sites, associated transportation and disposal cell facilities, and representative examples of the more than 4,000 known vicinity properties. Sites investigated include: Climax Mill Site, Truck/Train Haul Route, Cotter Transfer Station, Cheney Disposal Cell, Rifle Mill Sites (Old and New Rifle), Gunnison Mill Site, Vicinity Properties, and Estes Gulch and Proposed Landfill Site No. 1 Disposal Cells. The UMTRA Audit was a comprehensive baseline audit which considered all environmental programs and the activities associated with ongoing and planned remediation at the UMTRA sites listed above. Compliance with the National Environmental Policy Act (NEPA) was not considered during this investigation. The Audit Team looked at the following technical disciplines: air, surface water/drinking water, groundwater, soil/sediment/biota, waste management, toxic and chemical materials, quality assurance, radiation, inactive waste sites, and environmental management. 6 figs., 12 tabs.

  19. Prediction of Pseudo relative velocity response spectra at Yucca Mountain for underground nuclear explosions conducted in the Pahute Mesa testing area at the Nevada testing site; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Phillips, J.S.

    1991-12-01

    The Yucca Mountain Site Characterization Project (YMP), managed by the Office of Geologic Disposal of the Office of Civilian Radioactive Waste Management of the US Department of Energy, is examining the feasibility of siting a repository for commercial, high-level nuclear wastes at Yucca Mountain on and adjacent to the Nevada Test Site (NTS). This work, intended to extend our understanding of the ground motion at Yucca Mountain resulting from testing of nuclear weapons on the NTS, was funded by the Yucca Mountain project and the Military Applications Weapons Test Program. This report summarizes one aspect of the weapons test seismic investigations conducted in FY88. Pseudo relative velocity response spectra (PSRV) have been calculated for a large body of surface ground motions generated by underground nuclear explosions. These spectra have been analyzed and fit using multiple linear regression techniques to develop a credible prediction technique for surface PSRVs. In addition, a technique for estimating downhole PSRVs at specific stations is included. A data summary, data analysis, prediction development, prediction evaluation, software summary and FORTRAN listing of the prediction technique are included in this report.

  20. Site characterization quality assurance for the California LLRW Disposal Site Project

    International Nuclear Information System (INIS)

    Hanrahan, T.P.; Ench, J.E.; Serlin, C.L.; Bennett, C.B.

    1988-01-01

    In December of 1985 US Ecology was chosen as the license designee for the State of California's low-level radioactive waste disposal facility. In early 1987, three candidate sites were selected for characterization studies in preparation for identifying the preferred site. The geotechnical characterization activities along with studies of the ecological and archaeological attributes, as well as assessments of the socio-economic impacts and cultural resources all provide input towards selection of the proposed site. These technical studies in conjunction with comments from local citizen committees and other interested parties are used as a basis for determining the proposed site for which full site characterization as required by California licensing requirements are undertaken. The purpose of this paper is to present an overview of the program for Quality Assurance and Quality Control for the site characterization activities on the California LLRW Disposal Site Project. The focus is on three major perspectives: The composite QA Program and two of the primary characterization activities, the geotechnical and the meteorological investigations

  1. National Ignition Facility subsystem design requirements NIF site improvements SSDR 1.2.1

    International Nuclear Information System (INIS)

    Kempel, P.; Hands, J.

    1996-01-01

    This Subsystem Design Requirements (SSDR) document establishes the performance, design, and verification requirements associated with the NIF Project Site at Lawrence Livermore National Laboratory (LLNL) at Livermore, California. It identifies generic design conditions for all NIF Project facilities, including siting requirements associated with natural phenomena, and contains specific requirements for furnishing site-related infrastructure utilities and services to the NIF Project conventional facilities and experimental hardware systems. Three candidate sites were identified as potential locations for the NIF Project. However, LLNL has been identified by DOE as the preferred site because of closely related laser experimentation underway at LLNL, the ability to use existing interrelated infrastructure, and other reasons. Selection of a site other than LLNL will entail the acquisition of site improvements and infrastructure additional to those described in this document. This SSDR addresses only the improvements associated with the NIF Project site located at LLNL, including new work and relocation or demolition of existing facilities that interfere with the construction of new facilities. If the Record of Decision for the PEIS on Stockpile Stewardship and Management were to select another site, this SSDR would be revised to reflect the characteristics of the selected site. Other facilities and infrastructure needed to support operation of the NIF, such as those listed below, are existing and available at the LLNL site, and are not included in this SSDR. Office Building. Target Receiving and Inspection. General Assembly Building. Electro- Mechanical Shop. Warehousing and General Storage. Shipping and Receiving. General Stores. Medical Facilities. Cafeteria services. Service Station and Garage. Fire Station. Security and Badging Services

  2. Environmental Assessment for the Warren Station externally fired combined cycle demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    The proposed Penelec project is one of 5 projects for potential funding under the fifth solicitation under the Clean Coal Technology program. In Penelec, two existing boilers would be replaced at Warren Station, PA; the new unit would produce 73 MW(e) in a combined cycle mode (using both gas-fired and steam turbines). The project would fill the need for a full utility-size demonstration of externally fire combined cycle (EFCC) technology as the next step toward commercialization. This environmental assessment was prepared for compliance with NEPA; its purpose is to provide sufficient basis for determining whether to prepare an environmental impact statement or to issue a finding of no significant impact. It is divided into the sections: purpose and need for proposed action; alternatives; brief description of affected environment; environmental consequences, including discussion of commercial operation beyond the demonstration period.

  3. Northeast Oregon Hatchery Project final siting report. Final report

    International Nuclear Information System (INIS)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed

  4. Wind Atlas for South Africa (WASA) Station and Site Description Report

    DEFF Research Database (Denmark)

    Mortensen, Niels Gylling; Hansen, Jens Carsten; Kelly, Mark C.

    As part of the “Wind Atlas for South Africa” project, site inspection trips were carried out by the Council for Scientific and Industrial Research (CSIR) and Risø DTU in April and June of 2011. A total of 10 sites featuring instrumented 60-m masts were visited; the present report summarises...... the findings of the site inspection teams. The main results are descriptions and documentation of the meteorological masts, instruments and site conditions. For each site, the location and magnetic declination have been determined, as well as the sensor boom directions on the mast. Elevation maps have been...... constructed to show the surrounding terrain and photos taken to document the land cover. Finally, the observed wind roses and wind speed distribution as of 1 October 2013 are shown....

  5. The Cordoba and Wolsung projects: a progress report

    International Nuclear Information System (INIS)

    Brooks, G.L.

    1977-06-01

    The Cordoba and Wolsung projects mark the entry into the international sales arena of the standardized Canadian 600 MWe CANDU-PHW reactor design. The Cordoba station experienced a setback in the early stages when severe inflation in Argentina led to a renegotiation of the contract. However, following this, good progress has been made and the current forecast completion date in 1980 is expected to be achieved. The Wolsung project experienced difficulties early in the project due to site conditions, so that site work commenced some 9-10 months later than originally planned. These difficulties had predictable effects upon the progress of site-related engineering and it is expected that the project completion date will be somewhat delayed

  6. Single-Station Sigma for the Iranian Strong Motion Stations

    Science.gov (United States)

    Zafarani, H.; Soghrat, M. R.

    2017-11-01

    In development of ground motion prediction equations (GMPEs), the residuals are assumed to have a log-normal distribution with a zero mean and a standard deviation, designated as sigma. Sigma has significant effect on evaluation of seismic hazard for designing important infrastructures such as nuclear power plants and dams. Both aleatory and epistemic uncertainties are involved in the sigma parameter. However, ground-motion observations over long time periods are not available at specific sites and the GMPEs have been derived using observed data from multiple sites for a small number of well-recorded earthquakes. Therefore, sigma is dominantly related to the statistics of the spatial variability of ground motion instead of temporal variability at a single point (ergodic assumption). The main purpose of this study is to reduce the variability of the residuals so as to handle it as epistemic uncertainty. In this regard, it is tried to partially apply the non-ergodic assumption by removing repeatable site effects from total variability of six GMPEs driven from the local, Europe-Middle East and worldwide data. For this purpose, we used 1837 acceleration time histories from 374 shallow earthquakes with moment magnitudes ranging from M w 4.0 to 7.3 recorded at 370 stations with at least two recordings per station. According to estimated single-station sigma for the Iranian strong motion stations, the ratio of event-corrected single-station standard deviation ( Φ ss) to within-event standard deviation ( Φ) is about 0.75. In other words, removing the ergodic assumption on site response resulted in 25% reduction of the within-event standard deviation that reduced the total standard deviation by about 15%.

  7. Licensing plan for UMTRA project disposal sites

    International Nuclear Information System (INIS)

    1993-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC's acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information

  8. Global Land Survey Impervious Mapping Project Web Site

    Science.gov (United States)

    DeColstoun, Eric Brown; Phillips, Jacqueline

    2014-01-01

    The Global Land Survey Impervious Mapping Project (GLS-IMP) aims to produce the first global maps of impervious cover at the 30m spatial resolution of Landsat. The project uses Global Land Survey (GLS) Landsat data as its base but incorporates training data generated from very high resolution commercial satellite data and using a Hierarchical segmentation program called Hseg. The web site contains general project information, a high level description of the science, examples of input and output data, as well as links to other relevant projects.

  9. Final site environmental statement: Blue Hills Station, Unit Nos. 1 and 2. Related to the determination of the suitability of Site G for eventual construction. Docket Nos. 50-510 and 50-511

    International Nuclear Information System (INIS)

    1978-07-01

    The site suitability analysis is based on the assumption that the Blue Hills Station will employ two pressurized water reactors to produce outputs of approximately 2814 MWt each. Two steam turbine generators will use the heat produced to provide approximately 957 MWe (gross) each. The exhaust steam will be cooled by four low-profile round mechanical-draft cooling towers. Assuming construction of a nuclear station at site G, a summary of environmental impacts and adverse effects is presented

  10. Refurbishment of Point Lepreau Generating Station

    International Nuclear Information System (INIS)

    Thompson, P.D.; Jaitly, R.; Ichiyen, N.; Petrilli, M.A.

    2004-01-01

    achieving clarity of the regulatory position and thus to minimize the financial risk associated with regulatory uncertainty. The Refurbishment outage is preceded by a detailed Engineering Project Phase that includes: Finalizing details of the Retube process including modeling, tooling development, site facilities and training of personnel; Perform Engineering activities related to design modifications, safety analysis and level II PSA; Construction of new waste storage structures to house Retube Waste and other additional waste storage structures for the extended life of the station; Setup necessary temporary construction facilities (offices, storage areas, change rooms, decontamination and maintenance areas); Perform detailed outage planning; Initiate development of detailed layup, commissioning and return to service procedures; Procure equipment and components. Although final project approval is still pending, NB Power has been carrying on a limited scope of activities that are important in reducing overall project financial risk. A number of these up-front activities relate to safety analysis and licensing issues related to life extension. In particular, a level II PSA along with additional safety analyses are being performed to complement that which currently support the existing Operating License for the station. This paper discusses the Safety and Licensing activities that were involved in defining the project scope and outlines the safety analysis related activities that will be performed in support of the Refurbishment project and extended operation. (author)

  11. SKI SITE-94. Deep Repository Performance Assessment Project. Summary

    International Nuclear Information System (INIS)

    1997-02-01

    The function of SITE-94 is to provide the Swedish Nuclear Power Inspectorate (SKI) with the capacity and supporting knowledge needed for reviewing the Swedish nuclear industry's R and D programs and for reviewing license applications, as stipulated in Swedish legislation. The report is structured as a Performance Assessment exercise needed for input to decisions regarding repository safety, but the SITE-94 is neither a safety assessment nor a model for future assessments to be undertaken by the prospective licensee. The specific project objectives of SITE-94 comprise site evaluation, performance assessment methodology, canister integrity and radionuclide release and transport calculations. The main report (SKI-R--96-36) gives a detailed description of the many inter-related studies undertaken as part of the research project, while the present report presents a condensed summary of the main report. 46 refs

  12. UMTS Network Stations

    Science.gov (United States)

    Hernandez, C.

    2010-09-01

    The weakness of small island electrical grids implies a handicap for the electrical generation with renewable energy sources. With the intention of maximizing the installation of photovoltaic generators in the Canary Islands, arises the need to develop a solar forecasting system that allows knowing in advance the amount of PV generated electricity that will be going into the grid, from the installed PV power plants installed in the island. The forecasting tools need to get feedback from real weather data in "real time" from remote weather stations. Nevertheless, the transference of this data to the calculation computer servers is very complicated with the old point to point telecommunication systems that, neither allow the transfer of data from several remote weather stations simultaneously nor high frequency of sampling of weather parameters due to slowness of the connection. This one project has developed a telecommunications infrastructure that allows sensorizadas remote stations, to send data of its sensors, once every minute and simultaneously, to the calculation server running the solar forecasting numerical models. For it, the Canary Islands Institute of Technology has added a sophisticated communications network to its 30 weather stations measuring irradiation at strategic sites, areas with high penetration of photovoltaic generation or that have potential to host in the future photovoltaic power plants connected to the grid. In each one of the stations, irradiance and temperature measurement instruments have been installed, over inclined silicon cell, global radiation on horizontal surface and room temperature. Mobile telephone devices have been installed and programmed in each one of the weather stations, which allow the transfer of their data taking advantage of the UMTS service offered by the local telephone operator. Every minute the computer server running the numerical weather forecasting models receives data inputs from 120 instruments distributed

  13. Seismic site-response characterization of high-velocity sites using advanced geophysical techniques: application to the NAGRA-Net

    Science.gov (United States)

    Poggi, V.; Burjanek, J.; Michel, C.; Fäh, D.

    2017-08-01

    The Swiss Seismological Service (SED) has recently finalised the installation of ten new seismological broadband stations in northern Switzerland. The project was led in cooperation with the National Cooperative for the Disposal of Radioactive Waste (Nagra) and Swissnuclear to monitor micro seismicity at potential locations of nuclear-waste repositories. To further improve the quality and usability of the seismic recordings, an extensive characterization of the sites surrounding the installation area was performed following a standardised investigation protocol. State-of-the-art geophysical techniques have been used, including advanced active and passive seismic methods. The results of all analyses converged to the definition of a set of best-representative 1-D velocity profiles for each site, which are the input for the computation of engineering soil proxies (traveltime averaged velocity and quarter-wavelength parameters) and numerical amplification models. Computed site response is then validated through comparison with empirical site amplification, which is currently available for any station connected to the Swiss seismic networks. With the goal of a high-sensitivity network, most of the NAGRA stations have been installed on stiff-soil sites of rather high seismic velocity. Seismic characterization of such sites has always been considered challenging, due to lack of relevant velocity contrast and the large wavelengths required to investigate the frequency range of engineering interest. We describe how ambient vibration techniques can successfully be applied in these particular conditions, providing practical recommendations for best practice in seismic site characterization of high-velocity sites.

  14. Sociological impacts of nuclear generating stations - summary report on the NRC post-licensing studies. Final report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Chalmers, J.; Pijawka, D.; Branch, K.; Bergmann, P.; Flynn, J.

    1982-07-01

    The Post-Licensing Studies had four objectives. The first was to identify the socioeconomic effects resulting from the construction and operation of each of twelve nuclear power stations. The socioeconomic variables examined included: economic, demographic, housing, government, public response, and social organization characteristics. The second objective was to determine the way in which the identified effects were evaluated by study area groups. The third objective was to identify the determinants of the project-related effects. This task required knowledge of what combination of site, project, or other determinants was responsible for the project-related effects and for the evaluation of the effects. The fourth objective was to make recommendations with respect to assessment methodologies that could best be used to project the socioeconomic effects of the construction and operation of proposed nuclear generating stations. The objectives of the Post-Licensing Studies are met by the twelve individual case studies and by the Summary Report. The case studies identified the nuclear power stations and describe the evaluation of the effects by area residents. The Summary Report describes the collective findings of the individual case studies, compares the findings across sites to identify possible determinants of the effects, and examines the implication of the findings for future siting decisions and for the methodology most appropriate for projective assessments

  15. Multi-Site Project Management A Program for Reducing the Cost of Technology Deployment at Department of Energy Sites

    International Nuclear Information System (INIS)

    Davis, N.R.; Selden, E.R.; Little, D.B.; Coleman, M.C.; Bennett, J.T.

    2009-01-01

    Retrieval and processing of High Level Waste (HLW) stored in Department of Energy (DOE) waste tanks is performed to support closure of the tanks as required by site specific regulatory agreements. Currently, there are four sites in the DOE Complex that have HLW tanks and must process and disposition HLW. As such, there is an opportunity to achieve an economy of scale and reduce duplication of efforts. Two or more sites typically have similar technology development and deployment needs. Technology development is already executed at the national level. As the technology is matured, the next step is to commission a design/build project. Typically each site performs this separately due to differences in waste type, tank design, site specific considerations such as proximity to the water table or to the site boundary. The focus of the individual sites tends to be on the differences between sites versus on the similarities thus there is an opportunity to minimize the cost for similar deployments. A team of engineers and project management professionals from the Savannah River Site has evaluated technology needs at the four HLW sites and determined that there is an economy of scale that can be achieved by specific technology deployments in the area of waste retrieval, waste pretreatment and waste disposition. As an example, the Waste on Wheels tank retrieval system (presented in the 2006 Waste Management Symposium) was designed and fabricated in portable modules that could be installed in HLW tanks at Hanford, Savannah River or Idaho. This same concept could be used for modular in-tank cesium removal process and equipment, tank cleaning mechanical equipment, and chemical tank cleaning process and equipment. The purpose of this paper is to present a multi-site project management approach that will reduce deployment costs and be consistent with DOE Order 413.3 project management principles. The approach will describe how projects can be managed by a lead site with

  16. H2USA: Siting Refueling Stations in the Northeast

    Energy Technology Data Exchange (ETDEWEB)

    Melaina, Marc W [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Muratori, Matteo [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Zuboy, Jarett [Consultant; Ellis, Steve [Honda

    2017-11-01

    To achieve cost-effective deployment of both fuel cell electric vehicles (FCEVs) and hydrogen stations, the number of vehicles and public stations must grow together in areas of highest demand. This fact sheet introduces two advanced modeling tools and presents preliminary analysis of the hydrogen refueling station locations needed to support early consumer demand for FCEVs in the Northeast United States. United States.

  17. Idaho National Laboratory Ten-Year Site Plan Project Description Document

    Energy Technology Data Exchange (ETDEWEB)

    Not Listed

    2012-03-01

    This document describes the currently active and proposed infrastructure projects listed in Appendix B of the Idaho National Laboratory 2013-2022 Ten Year Site Plan (DOE/ID-11449). It was produced in accordance with Contract Data Requirements List I.06. The projects delineated in this document support infrastructure needs at INL's Research and Education Campus, Materials and Fuels Complex, Advanced Test Reactor Complex and the greater site-wide area. The projects provide critical infrastructure needed to meet current and future INL opereational and research needs. Execution of these projects will restore, rebuild, and revitalize INL's physical infrastructure; enhance program execution, and make a significant contribution toward reducing complex-wide deferred maintenance.

  18. Advances in power station construction

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    This book is about power stations - specifically about the construction of modern power stations by the Central Electricity Generating Board in England and Wales over the past decade. It describes the work of the CEGB's Generation Development and Construction Division, perhaps better known throughout the world as simply 'Barnwood' where it has its Headquarters in Gloucester, UK. Barnwood was formed in the early 1970s to concentrate the CEGB's then dispersed engineering construction resources to cope with the smaller number but greatly increased size and complexity of modern power station projects. Perhaps uniquely over the ten years since its formation Barnwood has managed the construction of all types of station; coal-fired, oil-fired, nuclear, pumped storage and hydro. This book tells the story of these various projects and gives detailed descriptions of the respective stations. However, it is not intended as a comprehensive description of power station technology. Rather it is intended to convey the scale of such projects and the many decisions and compromises which have to be made in the course of managing their construction

  19. Ground-based multi-station spectroscopic imaging with ALIS. - Scientific highlights, project status and future prospects

    Science.gov (United States)

    Brändström; Gustavsson, Björn; Pellinen-Wannberg, Asta; Sandahl, Ingrid; Sergienko, Tima; Steen, Ake

    2005-08-01

    The Auroral Large Imaging System (ALIS) was first proposed at the ESA-PAC meeting in Lahnstein 1989. The first spectroscopic imaging station was operational in 1994, and since then up to six stations have been in simultaneous operation. Each station has a scientific-grade CCD-detector and a filter-wheel for narrow-band interference-filters with six positions. The field-of-view is around 70°. Each imager is mounted in a positioning system, enabling imaging of a common volume from several sites. This enables triangulation and tomography. Raw data from ALIS is freely available at ("http://alis.irf.se") and ALIS is open for scientific colaboration. ALIS made the first unambiguous observations of Radio-induced optical emissions at high latitudes, and the detection of water in a Leonid meteor-trail. Both rockets and satellite coordination are considered for future observations with ALIS.

  20. Survey of siting practices for selected management projects in seven countries

    International Nuclear Information System (INIS)

    Hardin, E.; Aahagen, H.

    1992-06-01

    This paper surveys siting practices for deep geologic disposal in seven countries, and attempts to formulate generalizations which could be useful for the upcoming review of the Swedish plan for siting the SFL repository (R and D 92). Comparison of projects in different countries is done with full appreciation of the technical, legal, and cultural differences. The seven countries were selected for experience with siting in crystalline rock, similarity of siting practices to Sweden, and the availability of published information. Local governments have demonstrated effective veto power in each of the seven countries surveyed, although this power is exercised in different ways. This paper shows how the siting strategy itself affects the ability and the inclination of localities to block the project. It shows by example that public involvement, parallel vs. sequential characterization, schedule for siting activities, and the existence of interim waste storage capability have an impact on the success of siting. The focus of this paper is deep geologic disposal. Shallow land disposal and non-radioactive wastes are not discussed in detail, with three exceptions: LLW disposal siting in the U.S. and Canada, and the SAKAB incinerator projects in Sweden. These provide insight into siting approaches and demonstrate that conclusions regarding deep geologic disposal are supported by other experience. (114 refs.) (au)

  1. Optimal planning of electric vehicle charging station at the distribution system using hybrid optimization algorithm

    DEFF Research Database (Denmark)

    Awasthi, Abhishek; Venkitusamy, Karthikeyan; Padmanaban, Sanjeevikumar

    2017-01-01

    India's ever increasing population has made it necessary to develop alternative modes of transportation with electric vehicles being the most preferred option. The major obstacle is the deteriorating impact on the utility distribution system brought about by improper setup of these charging...... stations. This paper deals with the optimal planning (siting and sizing) of charging station infrastructure in the city of Allahabad, India. This city is one of the upcoming smart cities, where electric vehicle transportation pilot project is going on under Government of India initiative. In this context......, a hybrid algorithm based on genetic algorithm and improved version of conventional particle swarm optimization is utilized for finding optimal placement of charging station in the Allahabad distribution system. The particle swarm optimization algorithm re-optimizes the received sub-optimal solution (site...

  2. Valuation procedure for supra-regional siting of nuclear power plants

    International Nuclear Information System (INIS)

    Volwahsen, A.

    1977-01-01

    The entwinement of area planning and power policies is explained and conceivable effects of the selection of site for nuclear power stations on the regional economic and social structure as well as the housing development are discussed. A research project and its purposes are presented here, the project having been initiated in order to examine the siting concepts emerging from the discussion of deverging interests, and in order to elaborate a variety of concrete requirements to be made with regard to site examination and site selection. Large-scole valuation indicators and procedures are expected to lead to solutions acceptable for all parties concerned. (HP) 891 HP [de

  3. Recycling by coverting organic waste to fertilize at Ikata Nuclear Power Station

    International Nuclear Information System (INIS)

    Kubota, T.; Matsuoka, H.

    2008-01-01

    In order to cope with global- warming and Dioxin issue, we started the Project in which all kinds of organic wastes originated on site are fermented to organic fertilizer with the help of YM bacteria in 2001. And in 2006 our product was officially approved as fertilizer by regulatory body, and then we started to sell these fertilizers to farmers near-by. Among many power stations in Japan, Ikata Nuclear Power Station may be the first plant where organic wastes are totally reused as commercial-based fertilizer. (author)

  4. Yucca Mountain Site Characterization Project Bibliography, July--December 1994: An update

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Charactrization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy`s Science and Technology Database from July 1, 1994 through December 31, 1994. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization`s list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it.

  5. Yucca Mountain Site Characterization Project Bibliography, July, December 194: An update

    International Nuclear Information System (INIS)

    1995-03-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Charactrization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Science and Technology Database from July 1, 1994 through December 31, 1994. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it

  6. Field testing of behavioral barriers for cooling water intake structures -test site 1 - Pickering Nuclear Generating Station

    International Nuclear Information System (INIS)

    Patrick, P.H.; McKinley, R.S.; Micheletti, W.C.

    1988-01-01

    A multi-year research program was developed by the Electric Power Research Institute to evaluate the effectiveness of selected behavioral systems for fish exclusion at sites representative of different aquatic environments. The first test site was the Pickering Nuclear Generating Station (NGS) located on Lake Ontario which represented the Great Lakes environment. A single pneumatic popper, a low frequency, high amplitude sound deterrent, was found to effectively exclude adult alewife, the principal species impinged at Pickering NGS. An air bubble curtain, used either alone or combined with strobe lights, was not a consistent deterrent. Effectiveness of air bubbles was only enhanced when used in association with a popper. Strobe lights were the least effective of the three devices tested. Operation of all three devices together did not surpass the effectiveness of the popper when used alone. Sound deterrents show promise for fish exclusion at generating stations located on the Great Lakes

  7. Development of low head Kaplan turbine for power station rehabilitation project

    Science.gov (United States)

    Lim, S. M.; Ohtake, N.; Kurosawa, S.; Suzuki, T.; Yamasaki, T.; Nishi, H.

    2012-11-01

    This paper presents the latest Kaplan turbine rehabilitation project for Funagira Power Station in Japan completed by J-POWER Group in collaboration with Toshiba Corporation. Area of rehabilitation was restricted to guide vane and runner. The main goal of the rehabilitation project was to expand the operating range of the existing turbine in terms of discharge and power with high operational stability, low noise as well as high cavitation performance. Computational Fluids Dynamics and model test were used to optimize the shape of guide vane and runner in development stage. Finally, field tests and runner inspection were carried out to confirm the performance of the new turbine. It was found that the new turbine has excellent performance in efficiency, power output, operational stability compared with existing turbine. Moreover, no sign of cavitation on the runner blade surface was observed after 5078 hours of operation near 100% load.

  8. Development of low head Kaplan turbine for power station rehabilitation project

    International Nuclear Information System (INIS)

    Lim, S M; Ohtake, N; Kurosawa, S; Suzuki, T; Yamasaki, T; Nishi, H

    2012-01-01

    This paper presents the latest Kaplan turbine rehabilitation project for Funagira Power Station in Japan completed by J-POWER Group in collaboration with Toshiba Corporation. Area of rehabilitation was restricted to guide vane and runner. The main goal of the rehabilitation project was to expand the operating range of the existing turbine in terms of discharge and power with high operational stability, low noise as well as high cavitation performance. Computational Fluids Dynamics and model test were used to optimize the shape of guide vane and runner in development stage. Finally, field tests and runner inspection were carried out to confirm the performance of the new turbine. It was found that the new turbine has excellent performance in efficiency, power output, operational stability compared with existing turbine. Moreover, no sign of cavitation on the runner blade surface was observed after 5078 hours of operation near 100% load.

  9. Site observational work plan for the UMTRA Project Site at Riverton, Wyoming. Revision 3/95

    International Nuclear Information System (INIS)

    1995-03-01

    Ground water compliance for the Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Riverton, Wyoming, site, is governed by the Uranium Mill Tailings Radiation Control Act and the US Environmental Protection Agency's Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings. The compliance strategy proposed for this site is natural flushing in conjunction with institutional controls. The essential premise of natural flushing is that ground water movement and natural attenuation processes will reduce the detected contamination to background levels or alternate concentration limits that do not pose a risk to human health or the environment within 100 years. This document contains the following sections. Section 2.0 of this SOWP describes the requirements for meeting standards at UMTRA Project sites. Section 3.0 provides site-specific data and the related conceptual model. Section 4.0 provides the justification for the recommended ground water compliance strategy for the Riverton site. Section 5.0 provides the justification and process for collection and assessment of additional required data. Section 6.0 provides a list of the references cited. The appendixes include data on monitor wells and lithography, ground water, surface water, and sediment quality

  10. Software quality assurance on the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Matras, J.R.

    1993-01-01

    The Yucca Mountain Site Characterization Project (YMP) has been involved over the years in the continuing struggle with establishing acceptable Software Quality Assurance (SQA) requirements for the development, modification, and acquisition of computer programs used to support the Mined Geologic Disposal System. These computer programs will be used to produce or manipulate data used directly in site characterization, design, analysis, performance assessment, and operation of repository structures, systems, and components. Scientists and engineers working on the project have claimed that the SQA requirements adopted by the project are too restrictive to allow them to perform their work. This paper will identify the source of the original SQA requirements adopted by the project. It will delineate the approach used by the project to identify concerns voiced by project engineers and scientists regarding the original SQA requirements. It will conclude with a discussion of methods used to address these problems in the rewrite of the original SQA requirements

  11. A Remote Characterization System for subsurface mapping of buried waste sites

    International Nuclear Information System (INIS)

    Sandness, G.A.; Bennett, D.W.; Martinson, L.

    1992-06-01

    This paper describes a development project that will provide new technology for characterizing hazardous waste burial sites. The project is a collaborative effort by five of the national laboratories, involving the development and demonstration of a remotely controlled site characterization system. The Remote Characterization System (RCS) includes a unique low-signature survey vehicle, a base station, radio telemetry data links, satellite-based vehicle tracking, stereo vision, and sensors for non-invasive inspection of the surface and subsurface

  12. Ichthyoplankton entrainment at Wylfa power station, Anglesey and implications for a further siting proposal

    International Nuclear Information System (INIS)

    Dempsey, C.H.; Rogers, S.I.

    1989-07-01

    A 12 month survey of ichthyoplankton in the cooling water system of Wylfa Power Station and the surrounding 40 km 2 of sea, was carried out between October 1986 and September 1987. The larvae of 31 species and the eggs of 8 species were identified in the survey. Samples taken from the cooling water system and by boat from offshore were largely similar in respect of species diversity and density. Estimates of annual losses due to entrainment are given both in terms of immediate losses and consequential losses of adults to the population. Estimates of losses of six commercially exploited species are considered in terms of loss to the commercial fishery. Assuming the 'worst case' of a 100% mortality of eggs and larvae passing through the cooling system, losses of ichthyoplankton due to entrainment at the existing 'magnox' nuclear power station at Wylfa Point are small and could have no significant adverse effect on fish populations of those species entrained. The operation of the proposed 'pressurised water reactor' nuclear power station on the same site would increase losses by up to 100%. Such an increase would still not alter the existing situation. No significant adverse effect is likely. (author)

  13. Shippingport Station Decommissioning Project: Removal of piping and equipment and removal of primary system components

    International Nuclear Information System (INIS)

    1989-01-01

    This report is a technical synopsis of the removal of contaminated and non-contaminated piping and equipment from the Shippingport Station Decommissioning Project (SSDP). The information is provided as a part of the Technology Transfer Program to document dismantling activities in support of reactor decommissioning. 5 refs., 29 figs., 4 tabs

  14. A systematic analysis of directional site effects at stations of the Italian Seismic Network to test the role of local topography

    Science.gov (United States)

    Pischiutta, Marta; Cianfarra, Paola; Salvini, Francesco; Cara, Fabrizio; Vannoli, Paola

    2018-03-01

    Directional site effects observed at seismological stations on pronounced relief are analyzed. We investigate the ground motion properties calculating horizontal-to-vertical spectral ratios and horizontal polarization of both ambient vibrations and earthquake records using broadband seismograms of the Italian Seismic Network. We find that a subset of 47 stations with pronounced relief, results in a significant (>2) directional amplification of the horizontal component, with a well defined, site-specific direction of motion. However, the horizontal spectral response of sites is not uniform, varying from an isolated (resonant) frequency peak to a broadband amplification, interesting frequency bands as large as 1-10 Hz in many cases. Using the 47 selected stations, we have tried to establish a relation between directional amplification and topography geometry in a 2D-vision, when applicable, through a morphological analysis of the Digital Elevation Model using Geographic Information Systems. The procedure computes the parameters that characterize the geometry of topographic irregularities (size and slope), in combination with a principal component analysis that automatically yields the orientation of the elongated ridges. In seeking a relation between directional amplification and the surface morphology, we have found that it is impossible to fit the variety of observations with a resonant topography model as well as to identify common features in the ground motion behavior for stations with similar topography typologies. We conclude that, rather than the shape of the topography, local structural complexities and details of the near-surface structure must play a predominant role in controlling ground motion properties at sites with pronounced relief.

  15. DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION

    International Nuclear Information System (INIS)

    K. Payette; D. Tillman

    2001-01-01

    During the period October 1, 2000 - December 31, 2000, Allegheny Energy Supply Co., LLC (Allegheny) executed a Cooperative Agreement with the National Energy Technology Laboratory to implement a major cofiring demonstration at the Willow Island Generating Station Boiler No.2. Willow Island Boiler No.2 is a cyclone boiler. Allegheny also will demonstrate separate injection cofiring at the Albright Generating Station Boiler No.3, a tangentially fired boiler. The Allegheny team includes Foster Wheeler as its primary subcontractor. Additional subcontractors are Cofiring Alternatives and N.S. Harding and Associates. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. The second quarter of the project involved completing the designs for each location. Further, geotechnical investigations proceeded at each site. Preparations were made to perform demolition on two small buildings at the Willow Island site. Fuels strategies were initiated for each site. Test planning commenced for each site. A groundbreaking ceremony was held at the Willow Island site on October 18, with Governor C. Underwood being the featured speaker

  16. Hinkley Point 'C' power station public inquiry: proof of evidence on local site related issues

    International Nuclear Information System (INIS)

    Gammon, K.M.

    1988-09-01

    A public inquiry has been set up to examine the planning application made by the Central Electricity Generating Board (CEGB) for the construction of a 1200 MW Pressurized Water Reactor power station at Hinkley Point (Hinkley Point ''C'') in the United Kingdom, adjacent to an existing nuclear power station. The CEGB evidence to the Inquiry on local site related issues begins by setting the proposed development within the context of local authority planning policies for the area. The implications of the development in terms of overall land needs, construction, access, buildings and works both temporary and permanent, are described. Environmental impacts, aesthetic and socio-economic factors are considered including possible effects on agriculture, nature conservation, water supply, transport and employment. (UK)

  17. Swedish encapsulation station review

    International Nuclear Information System (INIS)

    Andersson, Sven Olof; Brunzell, P.; Heibel, R.; McCarthy, J.; Pennington, C.; Rusch, C.; Varley, G.

    1998-06-01

    In the Encapsulation Station (ES) Review performed by NAC International, a number of different areas have been studied. The main objectives with the review have been to: Perform an independent review of the cost estimates for the ES presented in SKB's document 'Plan 1996'. This has been made through comparisons between the ES and BNFL's Waste Encapsulation Plant (WEP) at Sellafield as well as with the CLAB facility. Review the location of the ES (at the CLAB site or at the final repository) and its interaction with other parts of the Swedish system for spent fuel management. Review the logistics and plant capacity of the ES. Identify important safety aspects of the ES as a basis for future licensing activities. Based on NAC International's experience of casks for transport and storage of spent fuel, review the basic design of the copper/steel canister and the transport cask. This review insides design, manufacturing, handling and licensing aspects. Perform an overall comparison between the ES project and the CLAB project with the objective to identify major project risks and discuss their mitigation

  18. How to handle station black outs

    Energy Technology Data Exchange (ETDEWEB)

    Reisch, Frigyes [Swedish Nuclear Power Inspectorate, S-10252 Stockholm (Sweden)

    1986-02-15

    Station black out is defined as the loss of ail high voltage alternating current at a nuclear power site. An international study was made to survey the practices in the different countries. The best way to handle station black out is to avoid it therefore briefly the normal off site and emergency on site power supplies are discussed. The ways in use to enhance nuclear power plants using Boiling Water Reactors or Pressurized Water Reactors to cope with a station black out are discussed in some detail. (author)

  19. How to handle station black outs

    International Nuclear Information System (INIS)

    Reisch, Frigyes

    1986-01-01

    Station black out is defined as the loss of ail high voltage alternating current at a nuclear power site. An international study was made to survey the practices in the different countries. The best way to handle station black out is to avoid it therefore briefly the normal off site and emergency on site power supplies are discussed. The ways in use to enhance nuclear power plants using Boiling Water Reactors or Pressurized Water Reactors to cope with a station black out are discussed in some detail. (author)

  20. Hydrogen Station Cost Estimates: Comparing Hydrogen Station Cost Calculator Results with other Recent Estimates

    Energy Technology Data Exchange (ETDEWEB)

    Melaina, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Penev, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-09-01

    This report compares hydrogen station cost estimates conveyed by expert stakeholders through the Hydrogen Station Cost Calculation (HSCC) to a select number of other cost estimates. These other cost estimates include projections based upon cost models and costs associated with recently funded stations.

  1. Linux toys II 9 Cool New Projects for Home, Office, and Entertainment

    CERN Document Server

    Negus, Christopher

    2006-01-01

    Builds on the success of the original Linux Toys (0-7645-2508-5) and adds projects using different Linux distributionsAll-new toys in this edition include a car computer system with built-in entertainment and navigation features, bootable movies, a home surveillance monitor, a LEGO Mindstorms robot, and a weather mapping stationIntroduces small business opportunities with an Internet radio station and Internet caf ̌projectsCompanion Web site features specialized hardware drivers, software interfaces, music and game software, project descriptions, and discussion forumsIncludes a CD-ROM with scr

  2. Nevada Test Site Area 25, Radiological Survey and Cleanup Project, 1974-1983 (a revised final report). Revision 1

    International Nuclear Information System (INIS)

    Miller, M.G.

    1984-12-01

    This report describes the radiological survey, decontamination and decommissioning (D and D) of the Nevada Test Site (NTS) Area 25 facilities and land areas incorporated in the Nuclear Rocket Development Station (NRDS). Buildings, facilities and support systems used after 1959 for nuclear reactor and engine testing were surveyed for the presence of radioactive contamination. The radiological survey portion of the project encompassed portable instrument surveys and removable contamination surveys (swipe) for beta plus gamma and alpha radioactive contamination of facilities, equipment and land areas. Soil sampling was also accomplished. The majority of Area 25 facilities and land areas have been returned to unrestricted use. Remaining radiologically contaminated areas are posted with warning signs and barricades. 9 references, 23 figures

  3. Prototype Environmental Assessment of the impacts of siting and construction of an SPS ground receiving station

    Science.gov (United States)

    Hill, J.

    1980-01-01

    A prototype assessment of the environmental impacts of siting and constructing a Satellite Power System (SPS) Ground Receiving Station (GRS) is reported. The objectives of the study were: (1) to develop an assessment of the nonmicrowave related impacts of the reference system SPS GRS on the natural environment; (2) to assess the impacts of GRS construction and operations in the context of actual baseline data for a site in the California desert; and (3) to identify critical GRS characteristics or parameters that are most significant in terms of the natural environment.

  4. International Space Station Medical Projects - Full Services to Mars

    Science.gov (United States)

    Pietrzyk, R. A.; Primeaux, L. L.; Wood, S. J.; Vessay, W. B.; Platts, S. H.

    2018-01-01

    The International Space Station Medical Projects (ISSMP) Element provides planning, integration, and implementation services for HRP research studies for both spaceflight and flight analog research. Through the implementation of these two efforts, ISSMP offers an innovative way of guiding research decisions to meet the unique challenges of understanding the human risks to space exploration. Flight services provided by ISSMP include leading informed consent briefings, developing and validating in-flight crew procedures, providing ISS crew and ground-controller training, real-time experiment monitoring, on-orbit experiment and hardware operations and facilitating data transfer to investigators. For analog studies at the NASA Human Exploration Research Analog (HERA), the ISSMP team provides subject recruitment and screening, science requirements integration, data collection schedules, data sharing agreements, mission scenarios and facilities to support investigators. The ISSMP also serves as the HRP interface to external analog providers including the :envihab bed rest facility (Cologne, Germany), NEK isolation chamber (Moscow, Russia) and the Antarctica research stations. Investigators working in either spaceflight or analog environments requires a coordinated effort between NASA and the investigators. The interdisciplinary nature of both flight and analog research requires investigators to be aware of concurrent research studies and take into account potential confounding factors that may impact their research objectives. Investigators must define clear research requirements, participate in Investigator Working Group meetings, obtain human use approvals, and provide study-specific training, sample and data collection and procedures all while adhering to schedule deadlines. These science requirements define the technical, functional and performance operations to meet the research objectives. The ISSMP maintains an expert team of professionals with the knowledge and

  5. The controlled ecological life support system Antarctic analog project: Analysis of wastewater from the South Pole Station, Antarctica, volume 1

    Science.gov (United States)

    Flynn, Michael T.; Bubenheim, David L.; Straight, Christian L.; Belisle, Warren

    1994-01-01

    The Controlled Ecological Life Support system (CELSS) Antarctic Analog Project (CAAP) is a joint National Science Foundation (NSF) and NASA project for the development, deployment and operation of CELSS technologies at the Amundsen-Scott South Pole Station. NASA goals are operational testing of CELSS technologies and the conduct of scientific studies to facilitate technology selection and system design. The NSF goals are that the food production, water purification, and waste treatment capabilities which will be provided by CAAP will improve the quality of life for the South Pole inhabitants, reduce logistics dependence, and minimize environmental impacts associated with human presence on the polar plateau. This report presents an analysis of wastewater samples taken from the Amundsen-Scott South Pole Station, Antarctica. The purpose of the work is to develop a quantitative understanding of the characteristics of domestic sewage streams at the South Pole Station. This information will contribute to the design of a proposed plant growth/waste treatment system which is part of the CELSS Antarctic Analog Project (CAAP).

  6. Fire Protection Engineering Design Brief Template. Hydrogen Refueling Station.

    Energy Technology Data Exchange (ETDEWEB)

    LaFleur, Angela Christine [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States); Muna, Alice Baca [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States); Groth, Katrina M. [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States)

    2015-08-01

    Building a hydrogen infrastructure system is critical to supporting the development of alternate- fuel vehicles. This report provides a methodology for implementing a performance-based design of an outdoor hydrogen refueling station that does not meet specific prescriptive requirements in NFPA 2, The Hydrogen Technologies Code . Performance-based designs are a code-compliant alternative to meeting prescriptive requirements. Compliance is demonstrated by comparing a prescriptive-based fueling station design with a performance-based design approach using Quantitative Risk Assessment (QRA) methods and hydrogen risk assessment tools. This template utilizes the Sandia-developed QRA tool, Hydrogen Risk Analysis Models (HyRAM), which combines reduced-order deterministic models that characterize hydrogen release and flame behavior with probabilistic risk models to quantify risk values. Each project is unique and this template is not intended to account for site-specific characteristics. Instead, example content and a methodology are provided for a representative hydrogen refueling site which can be built upon for new hydrogen applications.

  7. The Jungfraujoch high-alpine research station (3454 m) as a background clean continental site for the measurement of aerosol parameters

    Energy Technology Data Exchange (ETDEWEB)

    Nyeki, S.; Baltensperger, U.; Jost, D.T.; Weingartner, E. [Paul Scherrer Inst. (PSI), Villigen (Switzerland); Colbeck, I. [Essex Univ., Colchester (United Kingdom)

    1997-09-01

    Aerosol physical parameter measurements are reported here for the first full annual set of data from the Jungfraujoch site. Comparison to NOAA background and regional stations indicate that the site may be designated as `clean continental` during the free tropospheric influenced period 03:00 -09:00. (author) figs., tab., refs.

  8. The Jungfraujoch high-alpine research station (3454 m) as a background clean continental site for the measurement of aerosol parameters

    International Nuclear Information System (INIS)

    Nyeki, S.; Baltensperger, U.; Jost, D.T.; Weingartner, E.; Colbeck, I.

    1997-01-01

    Aerosol physical parameter measurements are reported here for the first full annual set of data from the Jungfraujoch site. Comparison to NOAA background and regional stations indicate that the site may be designated as 'clean continental' during the free tropospheric influenced period 03:00 -09:00. (author) figs., tab., refs

  9. Palo Verde Nuclear Generating Station: an example of the state role in regional nuclear projects

    International Nuclear Information System (INIS)

    Pasternak, A.

    1980-10-01

    A nuclear power plant siting policy which confines new construction to existing sites will lead to the formation of large regional power centers, each involving many utilities from several states. The Palo Verde Nuclear Project in Arizona has been examined in terms of the role state regulation plays in large regional nuclear projects. State regulatory processes do not reflect the regional nature of large power centers. Decisions and actions by individual state regulatory commissions create risk and uncertainty for all the utility participants in regional projects. A climate and mechanism to encourage and facilitate interstate cooperation are needed to enhance the viability of the confined siting policy and the regional power center concept

  10. Cordova Lake dam hydroelectric generating station case study

    International Nuclear Information System (INIS)

    Kerr, D.; Huxley, J.

    1993-01-01

    The Ontario Ministry of Natural Resources released a Crown owned site to the private water power industry as part of the small hydro site release program initiated by the Ontario Government in the mid 1980's. The Cordova Lake Dam Hydroelectric Generating Station, built on this site, has been in operation since the first week of October, 1992. Since that time, the plant has been operating with less than 1 % down time and has generated over 2,400 MWh of electricity. Algonquin Power Systems is responsible for the management and operations of the plant which includes full time monitoring from the company's Mississauga office and a part time employee at Cordova Lake. Cordova Lake Dam is located on the Crowe River at the outlet of Cordova Lake, approximately 125 kilometers east of Toronto, Ontario. The total cost of the Cordova Lake Dam project was $1.6 million. Algonquin Power contributed 20% equity to the project. Algonquin Power was also responsible for all engineering and geotechnical work and for completing the construction and equipment contracts. 1 tab., 2 figs

  11. STRUVE arc and EUPOS® stations

    Science.gov (United States)

    Lasmane, Ieva; Kaminskis, Janis; Balodis, Janis; Haritonova, Diana

    2013-04-01

    The Struve Geodetic Arc was developed in Years 1816 to 1855, 200 years ago. Historic information on the points of the Struve Geodetic Arc are included in the UNESCO World Heritage list in 2005. Nevertheless, the sites of many points are still not identified nor included in the data bases nowadays. Originally STRUVE arc consisted of 258 main triangles with 265 triangulation points. Currently 34 of the original station points are identified and included in the in the UNESCO World Heritage list. identified original measurement points of the Meridian Arc are located in Sweden (7 points), Norway (15), Finland (83), Russia (1), Estonia (22), Latvia (16), Lithuania (18), Belorussia (28), Ukraine (59) and Moldova (27). In Year 2002 was initiated another large coverage project - European Position Determination System "EUPOS®". Currently there are about 400 continuously operating GNSS (Global Navigation Satellite Systems) stations covering EU countries Estonia, Latvia, Lithuania, Poland, Czech Republic, Slovakia, Hungary, Bulgaria, Romania and East European countries Ukraine and Moldavia. EUPOS® network is a ground based GNSS augmentation system widely used for geodesy, land surveying, geophysics and navigation. It gives the opportunity for fast and accurate position determination never available before. It is an honorable task to use the EUPOS® system for research of the Struve triangulation former sites. Projects with Struve arc can popularize geodesy, geo-information and its meaning in nowadays GIS and GNSS systems. Struve Arc and its points is unique cooperation cross-border object which deserve special attention because of their natural beauty and historical value for mankind. GNSS in geodesy discovers a powerful tool for the verification and validation of the height values of geodetic leveling benchmarks established historically almost 200 years ago. The differential GNSS and RTK methods appear very useful to identify vertical displacement of landscape by means of

  12. AECB staff annual assessment of the Pickering A and B Nuclear Generating Stations for the year 1995

    International Nuclear Information System (INIS)

    1996-06-01

    This report is the Atomic Energy Control Board (AECB) staff assessment of safety at the Pickering Nuclear Generating Station (PNGS-A and PNGS-B) for 1995. Our on-site Project Officers and Ottawa-based specialists monitored the stations throughout the year. In 1995, compliance with the Transportation Packaging of Radioactive Materials Regulations and the Cost Recovery Fees Regulations was satisfactory. The performance of the special safety systems was good. Releases of radioactive materials from the station were low and well below the legal limits for public safety. 10 tabs., 7 figs

  13. Tools and Methods for Risk Management in Multi-Site Engineering Projects

    Science.gov (United States)

    Zhou, Mingwei; Nemes, Laszlo; Reidsema, Carl; Ahmed, Ammar; Kayis, Berman

    In today's highly global business environment, engineering and manufacturing projects often involve two or more geographically dispersed units or departments, research centers or companies. This paper attempts to identify the requirements for risk management in a multi-site engineering project environment, and presents a review of the state-of-the-art tools and methods that can be used to manage risks in multi-site engineering projects. This leads to the development of a risk management roadmap, which will underpin the design and implementation of an intelligent risk mapping system.

  14. Secure base stations

    NARCIS (Netherlands)

    Bosch, Peter; Brusilovsky, Alec; McLellan, Rae; Mullender, Sape J.; Polakos, Paul

    2009-01-01

    With the introduction of the third generation (3G) Universal Mobile Telecommunications System (UMTS) base station router (BSR) and fourth generation (4G) base stations, such as the 3rd Generation Partnership Project (3GPP) Long Term Evolution (LTE) Evolved Node B (eNB), it has become important to

  15. Relationship between regional planning and site finding of power stations with regard to energy supply

    International Nuclear Information System (INIS)

    Hoppe, I.

    1980-01-01

    Based on the discussion on energy policy generally brought in the fore, spatial relationships are discussed especially in the field of electricity supply. A review is given of the legal systematism in which electricity supply and regional planning are to be found. How state planners organize the provision with sites for high-capacity thermal power stations is described as the concrete development of systematic legal relationships, concepts of, and opportunities for, state and regional planning. In the main part, this paper focusses on the analysis of the course of development power station construction and the distribution system have taken with regard to the question as to whether and to what extent this technological character is also responsible for an emerging structure in which these plants are mainly centred in a special region. (orig.) [de

  16. Summary of ground motion prediction results for Nevada Test Site underground nuclear explosions related to the Yucca Mountain project

    International Nuclear Information System (INIS)

    Walck, M.C.

    1996-10-01

    This report summarizes available data on ground motions from underground nuclear explosions recorded on and near the Nevada Test Site, with emphasis on the ground motions recorded at stations on Yucca Mountain, the site of a potential high-level radioactive waste repository. Sandia National Laboratories, through the Weapons Test Seismic Investigations project, collected and analyzed ground motion data from NTS explosions over a 14-year period, from 1977 through 1990. By combining these data with available data from earlier, larger explosions, prediction equations for several ground motion parameters have been developed for the Test Site area for underground nuclear explosion sources. Also presented are available analyses of the relationship between surface and downhole motions and spectra and relevant crustal velocity structure information for Yucca Mountain derived from the explosion data. The data and associated analyses demonstrate that ground motions at Yucca Mountain from nuclear tests have been at levels lower than would be expected from moderate to large earthquakes in the region; thus nuclear explosions, while located relatively close, would not control seismic design criteria for the potential repository

  17. Summary of ground motion prediction results for Nevada Test Site underground nuclear explosions related to the Yucca Mountain project

    Energy Technology Data Exchange (ETDEWEB)

    Walck, M.C.

    1996-10-01

    This report summarizes available data on ground motions from underground nuclear explosions recorded on and near the Nevada Test Site, with emphasis on the ground motions recorded at stations on Yucca Mountain, the site of a potential high-level radioactive waste repository. Sandia National Laboratories, through the Weapons Test Seismic Investigations project, collected and analyzed ground motion data from NTS explosions over a 14-year period, from 1977 through 1990. By combining these data with available data from earlier, larger explosions, prediction equations for several ground motion parameters have been developed for the Test Site area for underground nuclear explosion sources. Also presented are available analyses of the relationship between surface and downhole motions and spectra and relevant crustal velocity structure information for Yucca Mountain derived from the explosion data. The data and associated analyses demonstrate that ground motions at Yucca Mountain from nuclear tests have been at levels lower than would be expected from moderate to large earthquakes in the region; thus nuclear explosions, while located relatively close, would not control seismic design criteria for the potential repository.

  18. Impacts and societal benefits of research activities at Summit Station, Greenland

    Science.gov (United States)

    Hawley, R. L.; Burkhart, J. F.; Courville, Z.; Dibb, J. E.; Koenig, L.; Vaughn, B. H.

    2017-12-01

    Summit Station began as the site for the Greenland Ice Sheet Project 2 ice core in 1989. Since then, it has hosted both summer campaign science, and since 1997, year-round observations of atmospheric and cryospheric processes. The station has been continuously occupied since 2003. While most of the science activities at the station are supported by the US NSF Office of Polar Programs, the station also hosts many interagency and international investigations in physical glaciology, atmospheric chemistry, satellite validation, astrophysics and other disciplines. Summit is the only high elevation observatory north of the Arctic circle that can provide clean air or snow sites. The station is part of the INTER-ACT consortium of Arctic research stations with the main objective to identify, understand, predict and respond to diverse environmental changes, and part of the International Arctic Systems for Observing the Atmosphere (IASOA) that coordinates Arctic research activities and provides a networked, observations-based view of the Arctic. The Summit Station Science Summit, sponsored by NSF, assembled a multidisciplinary group of scientists to review Summit Station science, define the leading research questions for Summit, and make community-based recommendations for future science goals and governance for Summit. The impact of several on-going observation records was summarized in the report "Sustaining the Science Impact of Summit Station, Greenland," including the use of station data in weather forecasts and climate models. Observations made at the station as part of long-term, year-round research or during shorter summer-only campaign seasons contribute to several of the identified Social Benefit Areas (SBAs) outlined in the International Arctic Observations Assessment Framework published by the IDA Science and Technology Policy Institute and Sustaining Arctic Observing Networks as an outcome of the 2016 Arctic Science Ministerial. The SBAs supported by research

  19. Air and radiation monitoring stations

    CERN Multimedia

    AUTHOR|(SzGeCERN)582709

    2015-01-01

    CERN has around 100 monitoring stations on and around its sites. New radiation measuring stations, capable of detecting even lower levels of radiation, were installed in 2014. Two members of HE-SEE group (Safety Engineering and Environment group) in front of one of the new monitoring stations.

  20. Living memorials project: year 1 social and site assessment

    Science.gov (United States)

    Erika S. Svendsen; Lindsay K. Campbell

    2005-01-01

    The Living Memorials Project (LMP) social and site assessment identified more than 200 public open spaces created, used, or enhanced in memory of the tragic events of September 11, 2001 (9-11). A national registry of these sites is available for viewing and updating online. Researchers interviewed 100 community groups using social ecology methods of observation,...

  1. Aspects of safety and of functional construction and configuration in planning and designing nuclear heating stations

    International Nuclear Information System (INIS)

    Adam, E.; Mueller, R.; Boettger, M.; Kremtz, U.

    1982-01-01

    The present studies are based on the design of a technological project of a nuclear heating station with a unit power of 250 MW. Essentially, this nuclear heating station is a three-circuit plant, the primary coolant circuit being based on natural circulation through the reactor vessel with integrated heat exchangers. Starting from the social objective and the derived development structure of the territory, the siting problems in integrating the nuclear heating stations have to be solved. On the basis of the resulting dimensions of the containment the technical and economical specifications of different versions of containment design are evaluated. (author)

  2. Improving regulatory effectiveness in Federal/State siting actions: Federal/State regulatory permitting actions in selected nuclear power station licensing cases

    International Nuclear Information System (INIS)

    Baroff, J.

    1977-06-01

    The Federal/State regulatory permitting actions in 12 case histories of nuclear power station licensing in nine different states are documented. General observations regarding Federal/State siting roles in the siting process are included. Eleven of the case histories are illustrated with a logic network that gives the actions of the utilities in addition to the Federal/State permits

  3. Facility siting as a decision process at the Savannah River Site

    International Nuclear Information System (INIS)

    Wike, L.D.

    1995-01-01

    Site selection for new facilities at Savannah River Site (SRS) historically has been a process dependent only upon specific requirements of the facility. While this approach is normally well suited to engineering and operational concerns, it can have serious deficiencies in the modern era of regulatory oversight and compliance requirements. There are many issues related to the site selection for a facility that are not directly related to engineering or operational requirements; such environmental concerns can cause large schedule delays and budget impact,s thereby slowing or stopping the progress of a project. Some of the many concerns in locating a facility include: waste site avoidance, National Environmental Policy Act requirements, Clean Water Act, Clean Air Act, wetlands conservation, US Army Corps of Engineers considerations, US Fish and Wildlife Service statutes including threatened and endangered species issues, and State of South Carolina regulations, especially those of the Department of Health and Environmental Control. In addition, there are SRS restrictions on research areas set aside for National Environmental Research Park (NERP), Savannah River Ecology Laboratory, Savannah River Forest Station, University of South Carolina Institute of Archaeology and Anthropology, Southeastern Forest Experimental Station, and Savannah River Technology Center (SRTC) programs. As with facility operational needs, all of these siting considerations do not have equal importance. The purpose of this document is to review recent site selection exercises conducted for a variety of proposed facilities, develop the logic and basis for the methods employed, and standardize the process and terminology for future site selection efforts

  4. Biological field stations: research legacies and sites for serendipity

    Science.gov (United States)

    William K. Michener; Keith L. Bildstein; Arthur McKee; Robert R. Parmenter; William W. Hargrove; Deedra McClearn; Mark Stromberg

    2009-01-01

    Biological field stations are distributed throughout North America, capturing much of the ecological variability present at the continental scale and encompassing many unique habitats. In addition to their role in supporting research and education, field stations offer legacies of data, specimens, and accumulated knowledge. Such legacies often provide the only...

  5. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2005-09-30

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004.

  6. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    International Nuclear Information System (INIS)

    2005-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004

  7. Developmental state and perspectives of USSR power stations, espec. nuclear power stations

    International Nuclear Information System (INIS)

    1983-01-01

    According to the resolutions of the 25th and 26th party congresses of the CPSU, the Soviet electric and thermal energy economy envisages as the mainstreams in development: Energy projects based on nuclear fuel, i.e. nuclear power stations (NPS), nuclear heat- and -power stations (NHPS) and nuclear heat stations (NHS); fuel-energy complexes: Ekibastuz, Kansk-Achinsk, West-Siberian complex (Tyumen); power stations utilizing non-conventional regenerative energy sources, i.e. solar, geothermal, MHD power stations. Further down, an overview is given on the developmental perspectives of nuclear-heat and nuclear-power economy and on the development of energy management based on fossil fuels. (orig./UA) [de

  8. Swedish encapsulation station review

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Sven Olof; Brunzell, P.; Heibel, R.; McCarthy, J.; Pennington, C.; Rusch, C.; Varley, G. [NAC International, Zuerich (Switzerland)

    1998-06-01

    In the Encapsulation Station (ES) Review performed by NAC International, a number of different areas have been studied. The main objectives with the review have been to: Perform an independent review of the cost estimates for the ES presented in SKB`s document `Plan 1996`. This has been made through comparisons between the ES and BNFL`s Waste Encapsulation Plant (WEP) at Sellafield as well as with the CLAB facility. Review the location of the ES (at the CLAB site or at the final repository) and its interaction with other parts of the Swedish system for spent fuel management. Review the logistics and plant capacity of the ES. Identify important safety aspects of the ES as a basis for future licensing activities. Based on NAC International`s experience of casks for transport and storage of spent fuel, review the basic design of the copper/steel canister and the transport cask. This review insides design, manufacturing, handling and licensing aspects. Perform an overall comparison between the ES project and the CLAB project with the objective to identify major project risks and discuss their mitigation 19 refs, 9 figs, 35 tabs

  9. Continuous atmospheric monitoring of the injected CO2 behavior over geological storage sites using flux stations: latest technologies and resources

    Science.gov (United States)

    Burba, George; Madsen, Rodney; Feese, Kristin

    2014-05-01

    Flux stations have been widely used to monitor emission rates of CO2 from various ecosystems for climate research for over 30 years [1]. The stations provide accurate and continuous measurements of CO2 emissions with high temporal resolution. Time scales range from 20 times per second for gas concentrations, to 15-minute, hourly, daily, and multi-year periods. The emissions are measured from the upwind area ranging from thousands of square meters to multiple square kilometers, depending on the measurement height. The stations can nearly instantaneously detect rapid changes in emissions due to weather events, as well as changes caused by variations in human-triggered events (pressure leaks, control releases, etc.). Stations can also detect any slow changes related to seasonal dynamics and human-triggered low-frequency processes (leakage diffusion, etc.). In the past, station configuration, data collection and processing were highly-customized, site-specific and greatly dependent on "school-of-thought" practiced by a particular research group. In the last 3-5 years, due to significant efforts of global and regional CO2 monitoring networks (e.g., FluxNet, Ameriflux, Carbo-Europe, ICOS, etc.) and technological developments, the flux station methodology became fairly standardized and processing protocols became quite uniform [1]. A majority of current stations compute CO2 emission rates using the eddy covariance method, one of the most direct and defensible micrometeorological techniques [1]. Presently, over 600 such flux stations are in operation in over 120 countries, using permanent and mobile towers or moving platforms (e.g., automobiles, helicopters, and airplanes). Atmospheric monitoring of emission rates using such stations is now recognized as an effective method in regulatory and industrial applications, including carbon storage [2-8]. Emerging projects utilize flux stations to continuously monitor large areas before and after the injections, to locate and

  10. Yucca Mountain Site Characterization Project bibliography, 1992--1994. Supplement 4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-06-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy`s Energy Science and Technology Database from January 1, 1992, through December 31, 1993. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization`s list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it. Earlier information on this project can be found in the first bibliography DOE/TIC-3406, which covers 1977--1985, and its three supplements DOE/OSTI-3406(Suppl.1), DOE/OSTI-3406(Suppl.2), and DOE/OSTI-3406(Suppl.3), which cover information obtained during 1986--1987, 1988--1989, and 1990--1991, respectively. All entries in the bibliographies are searchable online on the NNW database file. This file can be accessed through the Integrated Technical Information System (ITIS) of the US Department of Energy (DOE).

  11. Yucca Mountain Site Characterization Project bibliography, 1992--1993. Supplement 4

    International Nuclear Information System (INIS)

    1992-06-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Energy Science and Technology Database from January 1, 1992, through December 31, 1993. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it. Earlier information on this project can be found in the first bibliography DOE/TIC-3406, which covers 1977--1985, and its three supplements DOE/OSTI-3406(Suppl.1), DOE/OSTI-3406(Suppl.2), and DOE/OSTI-3406(Suppl.3), which cover information obtained during 1986--1987, 1988--1989, and 1990--1991, respectively. All entries in the bibliographies are searchable online on the NNW database file. This file can be accessed through the Integrated Technical Information System (ITIS) of the US Department of Energy (DOE)

  12. Project 57 Air Monitoring Report: October 1, 2013, through December 31, 2014

    Energy Technology Data Exchange (ETDEWEB)

    Mizell, Steve A. [Desert Research Inst. (DRI), Las Vegas, NV (United States); Nikolich, George [Desert Research Inst. (DRI), Las Vegas, NV (United States); McCurdy, Greg [Desert Research Inst. (DRI), Reno, NV (United States); Shadel, Craig [Desert Research Inst. (DRI), Las Vegas, NV (United States); Miller, Julianne J. [Desert Research Inst. (DRI), Las Vegas, NV (United States)

    2016-02-01

    On April 24, 1957, the Atomic Energy Commission (AEC, now the Department of Energy [DOE]) conducted the Project 57 safety experiment in western Emigrant Valley north east of the Nevada National Security Site (NNSS, formerly the Nevada Test Site) on lands withdrawn by the Department of Defense (DoD) for the Nevada Test and Training Range (NTTR). The test was undertaken to develop (1) a means of estimating plutonium distribution resulting from a nonnuclear detonation; (2) biomedical evaluation techniques for use in plutonium-laden environments; (3) methods of surface decontamination; and (4) instruments and field procedures for prompt estimation of alpha contamination (Shreve, 1958). Although the test did not result in the fission of nuclear materials, it did disseminate plutonium across the land surface. Following the experiment, the AEC fenced the contaminated area and returned control of the surrounding land to the DoD. Various radiological surveys have been performed in the area and in 2007, the DOE expanded the demarked contamination area by posting signs 200 to 400 feet (60 to 120 meters) outside of the original fence. Plutonium in soil is thought to attach preferentially to smaller particles. Therefore, redistribution of soil particulates by wind (dust) is the mechanism most likely to transport plutonium beyond the boundary of the Project 57 contamination area. In 2011, DRI installed two instrumentation towers to measure radiological, meteorological, and dust conditions. The monitoring activity was implemented to determine if radionuclide contamination was detectable in samples of airborne dust and characterize meteorological and environmental parameters that influence dust transport. Collected data also permits comparison of radiological conditions at the Project 57 monitoring stations to conditions observed at Community Environmental Monitoring Program (CEMP) stations around the NTTR. Biweekly samples of airborne particulates are submitted for laboratory

  13. Project M: Scale Model of Lunar Landing Site of Apollo 17

    Science.gov (United States)

    O'Brien, Hollie; Crain, Timothy P.

    2010-01-01

    The basis of the project was creating a scale model representation of the Apollo 17 lunar landing site. Vital components included surface slope characteristics, crater sizes and locations, prominent rocks, and lighting conditions. The model was made for Project M support when evaluating approach and terminal descent as well as when planning surface operations with respect to the terrain. The project had five main mi lestones during the length of the project. The first was examining the best method to use to re-create the Apollo 17 landing site and then reviewing research fmdings with Dr. Tim Crain and EO staff which occurred on June 25, 2010 at a meeting. The second step was formulating a construction plan, budget, and schedule and then presenting the plan for authority to proceed which occurred on July 6,2010. The third part was building a prototype to test materials and building processes which were completed by July 13, 2010. Next was assembling the landing site model and presenting a mid-term construction status report on July 29, 2010. The fifth and final milestone was demonstrating the model and presenting an exit pitch which happened on August 4, 2010. The project was very technical: it needed a lot of research about moon topography, lighting conditions and angles of the sun on the moon, Apollo 17, and Autonomous Landing and Hazard Avoidance Technology (ALHAT), before starting the actual building process. This required using Spreadsheets, searching internet sources and conducting personal meetings with project representatives. This information assisted the interns in deciding the scale of the model with respect to cracks, craters and rocks and their relative sizes as the objects mentioned could interfere with any of the Lunar Landers: Apollo, Project M and future Landers. The project concluded with the completion of a three dimensional scale model of the Apollo 17 Lunar landing site. This model assists Project M members because they can now visualize

  14. 75 FR 39926 - Deer Creek Station Energy Facility Project (DOE/EIS-0415)

    Science.gov (United States)

    2010-07-13

    ... when wind energy is not available. Water resources concerns are related to erosion and sedimentation... withdrawal at Project start-up to fill the on-site water storage tank. Monitoring will take place at least...

  15. UMTRA project water sampling and analysis plan, Tuba City, Arizona

    International Nuclear Information System (INIS)

    1996-02-01

    Planned, routine ground water sampling activities at the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Tuba City, Arizona, are described in the following sections of this water sampling and analysis plan (WSAP). This plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the stations routinely monitored at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the U.S. Environmental Protection Agency (EPA) regulations in 40 CFR Part 192 (1994) and the final EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), and the most effective technical approach for the site

  16. Project of a Near-Real-Time Sismo-acoustic Submarine Station for offshore monitoring (NRTSSS)

    Science.gov (United States)

    D'Anna, G.; Calore, D.; Mangano, G.; D'Alessandro, A.; Favali, P.

    2011-12-01

    The INGV seismic network ensures reliable and continuous monitoring of the Italian territory. However, the peculiarity of the Italian peninsula, characterised by an intense offshore geodynamic and seismic activity, requires the extension of the seismic monitoring to the sea. The aim of this project is: - to identify bottleneck is related to the construction, installation and use of underwater seismic station; - to define the most appropriate and low-cost architecture to guarantee the minimum functionality required for a seismic station. In order to obtain reliable seafloor seismic signals integrated to land-based network, the requirements to be fulfill are: - an acceptable coupling with the seabed; - the orientation of the components with respect to the magnetic North and to the verticality; - the correct time stamp of the data; - the data transfer to the land for the integration. Currently, the optimal solution for offshore seismic station is a cable connection to power and real-time data transfer, like the case of Western Ionian Sea cabled observatory, one of the operative node of the EMSO research infrastructure (European Multidisciplinary Seafloor and water column Observatory, http://emso-eu.org). But in the Mediterranean many seismic areas are located a few tens-hundreds of miles from the coast and cabled solutions are not feasible essentially for economic reasons. For this kind of installations EMSO research infrastructure foresees no-cabled solution, that requires a surface buoy deployed in the vicinity seafloor modules.This project plans to develop a surface buoy equipped with autonomous power supply system to power also the seafloor platforms and two-way communication system enabling the data transfer through latest generation of broadband radio communication or satellite link (Fig. 1). All the components of the prototype system are described.

  17. CosmoQuest Year 1.5: Citizen Scientist Behaviors and Site Usage Across Multiple Projects

    Science.gov (United States)

    Gugliucci, Nicole E.; Gay, P. L.; Bracey, G.; CosmoQuest Team

    2013-06-01

    CosmoQuest launched as a citizen science portal in January 2012 and has since expanded to include three projects in planetary surface mapping, one completed project searching for KBOs, and several more on the way with various astrophysical science goals. We take a close look at how our users move through the site, how much time they spend on various tasks, project retention rate, and how many use multiple projects on the site. We are also piloting a citizen science motivation survey given to random site users to find out why citizen scientists join new projects and continue to participate. This is part of a larger project using online and real-life interactions to study citizen scientist behaviors, motivations, and learning with a goal of building better community with researchers, volunteers, educators, and developers.

  18. Corrective action decision document, Second Gas Station, Tonopah test range, Nevada (Corrective Action Unit No. 403)

    International Nuclear Information System (INIS)

    1997-11-01

    This Corrective Action Decision Document (CADD) for Second Gas Station (Corrective Action Unit [CAU] No. 403) has been developed for the U.S. Department of Energy's (DOE) Nevada Environmental Restoration Project to meet the requirements of the Federal Facility Agreement and Consent Order (FFACO) of 1996 as stated in Appendix VI, open-quotes Corrective Action Strategyclose quotes (FFACO, 1996). The Second Gas Station Corrective Action Site (CAS) No. 03-02-004-0360 is the only CAS in CAU No. 403. The Second Gas Station CAS is located within Area 3 of the Tonopah Test Range (TTR), west of the Main Road at the location of former Underground Storage Tanks (USTs) and their associated fuel dispensary stations. The TTR is approximately 225 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada, by air and approximately 56 km (35 mi) southeast of Tonopah, Nevada, by road. The TTR is bordered on the south, east, and west by the Nellis Air Force Range and on the north by sparsely populated public land administered by the Bureau of Land Management and the U.S. Forest Service. The Second Gas Station CAS was formerly known as the Underground Diesel Tank Site, Sandia Environmental Restoration Site Number 118. The gas station was in use from approximately 1965 to 1980. The USTs were originally thought to be located 11 meters (m) (36 feet [ft]) east of the Old Light Duty Shop, Building 0360, and consisted of one gasoline UST (southern tank) and one diesel UST (northern tank) (DOE/NV, 1996a). The two associated fuel dispensary stations were located northeast (diesel) and southeast (gasoline) of Building 0360 (CAU 423). Presently the site is used as a parking lot, Building 0360 is used for mechanical repairs of vehicles

  19. Contamination awareness at the Dresden Nuclear Power Station

    International Nuclear Information System (INIS)

    Pagel, D.J.; Rath, W.C.

    1986-01-01

    Dresden Nuclear Power Station, which is located ∼ 60 miles southwest of Chicago near Morris, Illinois, has been generating electricity since 1960. Owned by Commonwealth Edison, Dresden was the nation's first privately financed nuclear station. On its site are three boiling water reactors (BWRs). Due to the contamination potential inherent with a reactor, a contamination trending program was created at the station. Studies had indicated a rise in contamination events during refueling outages. Further increases were due to specific work projects such as hydrolyzing operations. The investigations suggested that contract personnel also increased the number of events. In 1983, a contamination awareness program was created. The 1984 contamination awareness program was comprised of the following: (1) a statistical review in which trended contamination events were discussed. (2) A demonstration of protective clothing removal by an individual making various mistakes. (3) Scenarios were developed for use in mock work areas. (4) Upper management involvement. Because of the 1984 program, favorable attention has been focused on Dresden from the US Nuclear Regulatory Commission and the Institute of Nuclear Power Operations

  20. Project plans for transuranic waste at small quantity sites in the Department of Energy comples-10522

    International Nuclear Information System (INIS)

    Mctaggart, Jerri Lynne; Lott, Sheila; Gadbury, Casey

    2009-01-01

    Los Alamos National Laboratory, Carlsbad Office (LANL-CO), has been tasked to write Project Plans for all of the Small Quantity Sites (SQS) with defense related Transuranic (TRU) waste in the Department of Energy (DOE) complex. Transuranic Work-Off Plans were precursors to the Project Plans. LANL-CO prepared a Work-Off Plan for each small quantity site. The Work-Off Plan that identified issues, drivers, schedules, and inventory. Eight sites have been chosen to deinventory their legacy TRU waste; Bettis Atomic Power Laboratory, General Electric-Vallecitos Nuclear Center, Lawrence Berkeley National Laboratory, Lawrence Livermore National Laboratory-Area 300, Nevada Test Site, Nuclear Radiation Development, Sandia National Laboratory, and the Separations Process Research Unit. Each plan was written for contact and/or remote handled waste if present at the site. These project plans will assist the small quantity sites to ship legacy TRU waste offsite and de-inventory the site of legacy TRU waste. The DOE is working very diligently to reduce the nuclear foot print in the United States. Each of the eight SQSs will be de-inventoried of legacy TRU waste during a campaign that ends September 2011. The small quantity sites have a fraction of the waste that large quantity sites possess. During this campaign, the small quantity sites will package all of the legacy TRU waste and ship to Idaho or directly to the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico. The sites will then be removed from the Transuranic Waste Inventory if they are de-inventoried of all waste. Each Project Plan includes the respective site inventory report, schedules, resources, drivers and any issues. These project plans have been written by the difficult waste team and will be approved by each site. Team members have been assigned to each site to write site specific project plans. Once the project plans have been written, the difficult team members will visit the sites to ensure nothing has

  1. Hydrogen Filling Station

    Energy Technology Data Exchange (ETDEWEB)

    Boehm, Robert F; Sabacky, Bruce; Anderson II, Everett B; Haberman, David; Al-Hassin, Mowafak; He, Xiaoming; Morriseau, Brian

    2010-02-24

    Hydrogen is an environmentally attractive transportation fuel that has the potential to displace fossil fuels. The Freedom CAR and Freedom FUEL initiatives emphasize the importance of hydrogen as a future transportation fuel. Presently, Las Vegas has one hydrogen fueling station powered by natural gas. However, the use of traditional sources of energy to produce hydrogen does not maximize the benefit. The hydrogen fueling station developed under this grant used electrolysis units and solar energy to produce hydrogen fuel. Water and electricity are furnished to the unit and the output is hydrogen and oxygen. Three vehicles were converted to utilize the hydrogen produced at the station. The vehicles were all equipped with different types of technologies. The vehicles were used in the day-to-day operation of the Las Vegas Valley Water District and monitoring was performed on efficiency, reliability and maintenance requirements. The research and demonstration utilized for the reconfiguration of these vehicles could lead to new technologies in vehicle development that could make hydrogen-fueled vehicles more cost effective, economical, efficient and more widely used. In order to advance the development of a hydrogen future in Southern Nevada, project partners recognized a need to bring various entities involved in hydrogen development and deployment together as a means of sharing knowledge and eliminating duplication of efforts. A road-mapping session was held in Las Vegas in June 2006. The Nevada State Energy Office, representatives from DOE, DOE contractors and LANL, NETL, NREL were present. Leadership from the National hydrogen Association Board of Directors also attended. As a result of this session, a roadmap for hydrogen development was created. This roadmap has the ability to become a tool for use by other road-mapping efforts in the hydrogen community. It could also become a standard template for other states or even countries to approach planning for a hydrogen

  2. Installing the earth station of Ka-band satellite frequency in Malaysia: conceptual framework for site decision

    Science.gov (United States)

    Mahmud, M. R.; Reba, M. N. M.; Jaw, S. W.; Arsyad, A.; Ibrahim, M. A. M.

    2017-05-01

    This paper developed a conceptual framework in determining the suitable location in installing the earth station for Ka-band satellite communication in Malaysia. This current evolution of high throughput satellites experienced major challenge due to Malaysian climate. Because Ka-band frequency is highly attenuated by the rainfall; it is an enormous challenge to define the most appropriate site for the static communication. Site diversity, a measure to anticipate this conflict by choosing less attenuated region and geographically change the transmission strategy on season basis require accurate spatio-temporal information on the geographical, environmental and hydro-climatology at local scale. Prior to that request, this study developed a conceptual framework to cater the needs. By using the digital spatial data, acquired from site measurement and remote sensing, the proposed framework applied a multiple criteria analysis to perform the tasks of site selection. With the advancement of high resolution remotely sensed data, site determination can be conducted as in Malaysia; accommodating a new, fast, and effective satellite communication. The output of this study is one of the pioneer contributions to create a high tech-society.

  3. Environmental assessment, proposed generating station for Darlington

    International Nuclear Information System (INIS)

    1975-04-01

    This document indicates the intention of Ontario Hydro to seek approval from the Provincial Government for its plan to construct and operate a 3400 MWe nuclear generating station at the Darlington site, west of Bowmanville. This preliminary proposal also contains the environmental assessment. The environmental section of this proposal describes and assesses the existing environment and the environmental influences which would occur due to the construction and operation of a nuclear generating station, consisting of four 850 MW units, at the Darlington site. This proposed station is similar to the Bruce GS A station presently under construction. (author)

  4. Decommissioning of nuclear power stations in community countries carried out and projected

    International Nuclear Information System (INIS)

    Cregut, A.; Gregory, A.R.

    1984-01-01

    The decommissioning of large plants such as nuclear power stations merits an approach requiring the introduction of measures and procedures allowing them to be dealt with efficiently; this efficiency would imply concern for optimum economy of operations while respecting the safety and protection rules inherent in nuclear energy. Consequently, plant owners require: the tactical and policy elements to guide them in their decisions and choices; efficient tools, equipment and processes which meet their needs; information gained from experience of decommissioning already carried out which would provide them with a verified background knowledge when dealing with problems. Since decommissioning experience to date has not made it possible to draw up codes and guidelines, it is important to review the work carried out by Community countries in particular on the decommissioning of nuclear power plants. The following paper does not claim to be exhaustive or to make value judgements. Its aim is to list the nuclear power stations shut down in Community countries, to outline the decommissioning levels selected in each case and to underline some interesting aspects of the technical options. In conclusion it will review what appeared to be the difficulties common to the various projects. (author)

  5. Site observational work plan for the UMTRA Project site at Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1994-09-01

    The Ambrosia Lake Uranium Mill Tailings Remedial Action (UMTRA) Project site is within the Grants Mineral Belt and was one of numerous uranium mills supplied by many local mines. Ground water contamination at the site occurred as a result of uranium mill operations. The potential for impacts to human health and the environment from contaminated ground water currently does not exist. No domestic or livestock wells accessing ground water from the uppermost aquifer have been identified within a 5 mile radius from the site. Therefore, no current exposure pathways to humans, livestock, or wildlife exist, nor are any foreseen. The proposed ground water compliance strategy under consideration for application at the Ambrosia Lake site is to perform no remediation, based on the application of supplemental standards because the ground water has ''limited use.''

  6. Regional Consumer Hydrogen Demand and Optimal Hydrogen Refueling Station Siting

    Energy Technology Data Exchange (ETDEWEB)

    Melendez, M.; Milbrandt, A.

    2008-04-01

    Using a GIS approach to spatially analyze key attributes affecting hydrogen market transformation, this study proposes hypothetical hydrogen refueling station locations in select subregions to demonstrate a method for determining station locations based on geographic criteria.

  7. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  8. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE's goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology

  9. Draft site characterization analysis of the site characterization report for the Basalt Waste Isolation Project, Hanford, Washington Site. Main report and Appendices A through D

    International Nuclear Information System (INIS)

    1983-03-01

    On November 12, 1982, the US Department of Energy submitted to the US Nuclear Regulatory Commission the Site Characterization Report for the Basalt Waste Isolation Project (DOE/RL 82-3). The Basalt Waste Isolation Project is located on DOE's Hanford Reservation in the State of Washington. NUREG-0960 contains the detailed analysis, by the NRC staff, of the site characterization report. Supporting technical material is contained in Appendices A through W

  10. Fuel Receiving and Storage Station. Nuclear Regulatory Commission's draft environmental statement

    International Nuclear Information System (INIS)

    1975-05-01

    A draft of the environmental impact statement for the Barnwell Fuel Receiving and Storage Station is presented. This facility is being constructed on a 1700 acre site about six miles west of the city of Barnwell in Barnwell County, South Carolina. The following topics are discussed: the site, the station, environmental effects of site preparation and station construction, environmental effects of station operation, effluent and environmental monitoring programs, environmental effects of accidents , need for the station, benefit-cost analysis of alternatives, and conclusions. (U.S.)

  11. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action(UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1996). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will be evaluated in the site-specific environmental assessment to determine potential environmental impacts and provide stakeholders a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  12. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1996-03-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action(UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1996). The DOE's goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will be evaluated in the site-specific environmental assessment to determine potential environmental impacts and provide stakeholders a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology

  13. Station black out of Fukushima Daiichi Nuclear Power Station Unit 1 was not caused by tsunamis

    International Nuclear Information System (INIS)

    Ito, Yoshinori

    2013-01-01

    Station black out (SBO) of Fukushima Daiichi Nuclear Power Station Unit 1 would be concluded to be caused before 15:37 on March 11, 2011 because losses of emergency ac power A system was in 15:36 and ac losses of B system in 15:37 according to the data published by Tokyo Electric Power Co. (TEPCO) in May 10, 2013. Tsunami attacked the site of Fukushima Daiichi Nuclear Power Station passed through the position of wave amplitude meter installed at 1.5 km off the coast after 15:35 and it was also recognized tsunami arrived at the coast of Unit 4 sea side area around in 15:37 judging from a series of photographs taken from the south side of the site and general knowledge of wave propagation. From a series of photographs and witness testimony, tsunami didn't attack Fukushima Daiichi Nuclear Power Station uniformly and tsunami's arrival time at the site of Unit 1 would be far later than arrival time at the coast of Unit 4 sea side area, which suggested it would be around in 15:39. TEPCO insisted tsunami passed through 1.5 km off the coast around in 15:33 and clock of wave amplitude meter was incorrect, which might be wrong. Thus SBO of Fukushima Daiichi Nuclear Power Station Unit 1 occurred before tsunami's arrival at the site of Unit 1 and was not caused by tsunami. (T. Tanaka)

  14. Principal facts of gravity stations with gravity and magnetic profiles from the southwest Nevada Test Site, Nye County, Nevada, as of January 1982

    International Nuclear Information System (INIS)

    Jansma, P.E.; Snyder, D.B.; Ponce, D.A.

    1983-01-01

    Three gravity profiles and principal facts of 2604 gravity stations in the southwest quadrant of the Nevada Test Site are documented in this data report. The residual gravity profiles show the gravity measurements and the smoothed curves derived from these points that were used in geophysical interpretations. The principal facts include station label, latitude, longitude, elevation, observed gravity value, and terrain correction for each station as well as the derived complete Bouguer and isostatic anomalies, reduced at 2.67 g/cm 3 . Accuracy codes, where available, further document the data

  15. The Misema generating station by CREC : the journey

    International Nuclear Information System (INIS)

    2003-01-01

    The Canadian Renewable Energy Corporation (CREC) was created in 2000 in response to the government's commitment to renewable energy. This publication presents a series of photographs illustrating the development of the Misema run-of-the river hydro generating station, including its 300 m long power tunnel from the intake to the powerhouse. The Misema project was the first in Ontario to run an underground tunnel to protect the river bank and reduce visual impact. It was also the first to have an underground power house that could withstand the 1 in 1,000 year flood. Connection to the grid is via a private 44,000 volt line. The station is fully automated to meet Ontario's power demand. Engineering and environmental approval for the project began in 2001, with construction starting in May 2001. The generating facility uses natural river flow to generate electricity, and is expected to play an important role in strengthening the electricity grid at its periphery and offer reliable power to thousands of customers. Small hydro also has minimal impact on the environment. CREC intends to make the site accessible to recreational canoeists, fishermen, geologists and tourists. The generating station was nearly completely constructed by local tradesmen and contractors, creating about 30,000 man-hours for the Englehart area. The Misema facility is contributing to Ontario's deregulated power market and has provided much needed electricity while reducing Ontario's greenhouse gas emissions. The facility was built to the highest international standards. figs

  16. Remaining Sites Verification Package for 132-D-3, 1608-D Effluent Pumping Station. Attchment to Waste Site Reclassification Form 2005-033

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2006-01-01

    Decommissioning and demolition of the 132-D-3 site, 1608-D Effluent Pumping Station was performed in 1986. Decommissioning included removal of equipment, water, and sludge for disposal as radioactive waste. The at- and below-grade structure was demolished to at least 1 m below grade and the resulting rubble buried in situ. The area was backfilled to grade with at least 1 m of clean fill and contoured to the surrounding terrain. Residual concentrations support future land uses that can be represented by a rural-residential scenario and pose no threat to groundwater or the Columbia River based on RESRAD modeling

  17. Cleanup protocol for 226Ra-contaminated cobbly soil at UMTRA Project sites

    International Nuclear Information System (INIS)

    Gonzales, D.E.; Millard, J.B.; Miller, M.L.; Metzler, D.

    1994-01-01

    The nonuniform distribution of 226Ra and other radiological contamination of cobbly soil encountered on several Uranium Mill Tailings Remedial Action Project sites is presented and discussed, and the concomitant challenges to the intent and implementation of the U.S. Environmental Protection Agency's soil cleanup standards are noted. In response to technical assessments and information presented to the U.S. Nuclear Regulatory Commission by the U.S. Department of Energy, the Nuclear Regulatory Commission has recently resolved the dilemma by concluding that compliance with Environmental Protection Agency soil cleanup standards for cobby soil at Uranium Mill Tailings Remedial Action Project sites would be adequately attained using bulk radionuclide concentrations, instead of requiring that the radionuclide concentration of the finer soil fraction passing a No. 4 mesh sieve met the standards. A Nuclear Regulatory Commission-approved procedure developed for cobbly soil remediation is outlined and discussed. The site-specific implementation of this procedure at Uranium Mill Tailings Remedial Action Project sites containing cobbly soil is estimated to save millions of dollars

  18. Fuel efficiency, availability and compressor station configuration

    Energy Technology Data Exchange (ETDEWEB)

    Lubomirsky, Matt; Kurz, Rainer [Solar Turbines Inc., San Diego, CA (United States); Klimov, Pavel [Intergas Central Asia, Astana (Kazakhstan)

    2009-12-19

    Compressor stations play a very important role in the success of a gas pipeline design and a careful selection of centrifugal compressors and drivers are key aspects for the success of the project. The state of the art design available today for this equipment provides overall high thermodynamic performance and consequently minimizes installed power requirements and energy usage with significant savings on operating expenses during the economic life of the project For any application of machinery in a pipeline compression station, one of the key questions to answer is the number of units to install to meet the flow requirements of the pipeline. Depending on the load profile of the pipeline, the answers may look different. Other factors to consider include the fact that gas turbines can produce a significant amount of additional power at lower ambient temperatures. So, even for constant load of the pipeline, the relative load of the driver changes. In this paper, a typical transcontinental pipeline with multiple compressor stations is evaluated. The determination of the exact hydraulic behavior of the pipeline is part of the modeling effort. The site ambient conditions, with a significant swing in ambient temperatures are considered. The issue discussed in this paper evolves around the availability that can be achieved with various configurations, based on actually achieved reliability and availability numbers. The other large impact on operating costs, fuel consumption will be discussed. Here, the choice of the number of installed units has a distinct impact on annual fuel consumption, as well as the capacity of the pipeline during various scenarios. (author)

  19. West Valley Demonstration Project site environmental report for calendar year 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    The West Valley Demonstration Project (WVDP), the site of a US Department of Energy environmental cleanup activity operated by West Valley Nuclear Services Co., Inc., (WVNS), is in the process of solidifying liquid high-level radioactive waste remaining at the site after commercial nuclear fuel reprocessing was discontinued. The Project is located in Western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1996 by environmental monitoring personnel. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. Appendix A is a summary of the site environmental monitoring schedule. Appendix B lists the environmental permits and regulations pertaining to the WVDP. Appendices C through F contain summaries of data obtained during 1996 and are intended for those interested in more detail than is provided in the main body of the report.

  20. Yucca Mountain Site Characterization Project Technical Data Catalog

    International Nuclear Information System (INIS)

    1992-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear, Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. Each new publication of the Technical Data Catalog supersedes the previous edition

  1. Yucca Mountain Site Characterization Project technical data catalog

    International Nuclear Information System (INIS)

    1992-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. Each new publication of the Technical Data Catalog supersedes the previous edition

  2. Eco-technology service station: the future of gas station; Posto eco-tecnologico: o posto do futuro

    Energy Technology Data Exchange (ETDEWEB)

    Moura, Newton R. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Daher, Humberto Antonio S. [PETROBRAS Distribuidora, Rio de Janeiro, RJ (Brazil)

    2004-07-01

    PETROBRAS Distribuidora and CENPES have a project to build an eco-technology service station at Ilha do Fundao, to know new technologies for vehicle fuelling, test of new vehicle natural gas compression system, and start projects with new fuels that are not available at Brazilian market. This service station concept shall be aligned with sustainability premise that are being established for both companies, that means, besides a technology focus, it shall have a social focus without any environment damage. PETROBRAS 'Board of Directors approved the expansion of PETROBRAS' Research and Development Center (CENPES) installations, including this service station construction. Some activities that will be developed at the service station are pointed out here: available of new natural gas compression system; micro-generation with micro turbine, fuel cell; and photo-voltaic cell technologies; hydrogen fuelling; oil-water system treatment; biodiesel fuelling. This station will have a show room opened to the public, with panels, videos and a CNG compressor in cut. (author)

  3. Physical decommissioning of the Shippingport Atomic Power Station

    International Nuclear Information System (INIS)

    Crimi, F.P.

    1988-01-01

    The Shippingport Atomic Power Station consists of the nuclear steam supply system and associated radioactive waste processing systems, which are owned by the United States Department of Energy (USDOE), and the turbine-generator and balance of plant which is owned by the Duquesne Light Company. The station is located at Shippingport, Pennsylvania on seven acres of land leased by USDOE from the Duquesne Light Company. The Shippingport Station Decommissioning Project (SSDP) is being managed for the USDOE by the General Electric Company and its integated subcontractor, Morrison Knudsen-Ferguson (MK-F) Company. The objectives of the Shippingport Station Decommissioning Project (SSDP) are to: Demonstrate the safe and cost effective dismantlement of a large scale nuclear power plant; Provide useful data for future decommissioning projects

  4. Radioecology applied to the studies of nuclear power station sites. Radioecological study of the middle Rhone. Pt.1. Trial interpretation of 'in situ' determination of sedimentary activity

    International Nuclear Information System (INIS)

    Picat, P.; Debeuns, G.; Maubert, H.; Cartier, Y.; Lacroix, D.; Angeli, A.; Diraison, J.; Caudoux, B.; Tempier, C.

    1980-01-01

    The Rhone section investigated over a distance of around 100 km includes many nuclear facilities in operation, under construction or projected; such as gas diffusion and reprocessing plants, graphite-gas, PWR type and breeder reactors. It is worthwhile defining the radioecological situation on the basis of existing discharges and with the prospect of the complete commissioning of six nuclear power station sites. The study of the activity of sediments and fishes has been selected. The results are analyzed in terms of the future prospects of nuclear sitings. It would appear that attention should be focused on the effects of the discharge technique (duration, method of dilution) and the follow-up of quantities and activity levels of the liquid effluents in relation with the changes in the hydrological components of the river. Such an approach aims to define those areas most sensitive to the total impact of the fall-out and of the nuclear industry [fr

  5. Hungarian repeat station survey, 2010

    Directory of Open Access Journals (Sweden)

    Péter Kovács

    2013-03-01

    Full Text Available The last Hungarian repeat station survey was completed between October 2010 and February 2011. Declination, inclination and the total field were observed using one-axial DMI fluxgate magnetometer mounted on Zeiss20A theodolite and GSM 19 Overhauser magnetometer. The magnetic elements of the sites were reduced to the epoch of 2010.5 on the basis of the continuous recordings of Tihany Geophysical Observatory. In stations located far from the reference observatory, the observations were carried out in the morning and afternoon in order to decrease the effect of the distant temporal correction. To further increase the accuracy, on-site dIdD variometer has also been installed near the Aggtelek station, in the Baradla cave, during the survey of the easternmost sites. The paper presents the technical details and the results of our last campaign. The improvement of the accuracy of the temporal reduction by the use of the local variometer is also reported.

  6. Spherical Projection Based Straight Line Segment Extraction for Single Station Terrestrial Laser Point Cloud

    Directory of Open Access Journals (Sweden)

    ZHANG Fan

    2015-06-01

    Full Text Available Due to the discrete distribution computing errors and lack of adaptability are ubiquitous in the current straight line extraction for TLS data methods. A 3D straight line segment extraction method is proposed based on spherical projection for single station terrestrial laser point clouds. Firstly, horizontal and vertical angles of each laser point are calculated by means of spherical coordinates, intensity panoramic image according to the two angles is generated. Secondly, edges which include straight line features are detected from intensity panoramic image by using of edge detection algorithm. Thirdly, great circles are detected from edges of panoramic image using spherical Hough transform. According to the axiom that a straight line segment in 3D space is a spherical great circle after spherical projection, detecting great circles from spherical projected data sets is essentially detecting straight line segments from 3D data sets without spherical projection. Finally, a robust 3D straight line fitting method is employed to fitting the straight lines and calculating parameters of the straight line segments. Experiments using different data sets and comparison with other methods show the accuracy and applicability of the proposed method.

  7. Critical path analysis in early stage of nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2009-01-01

    The technical program and contract model as well as project management system and preliminary design defined in the early stage of nuclear power project are the key condition impact on the quality, schedule and cost of the nuclear power project. This paper, taking the CPR1000 coastal nuclear power station as an example, analyzes the critical path in the early stage of nuclear power project for five fields, i.e. licensing, design and procurement, site preparation, tender of construction contracts and construction preparation, and organization. (authors)

  8. [STEM on Station Education

    Science.gov (United States)

    Lundebjerg, Kristen

    2016-01-01

    The STEM on Station team is part of Education which is part of the External Relations organization (ERO). ERO has traditional goals based around BHAG (Big Hairy Audacious Goal). The BHAG model is simplified to a saying: Everything we do stimulates actions by others to advance human space exploration. The STEM on Station education initiate is a project focused on bringing off the earth research and learning into classrooms. Educational resources such as lesson plans, activities to connect with the space station and STEM related contests are available and hosted by the STEM on Station team along with their partners such as Texas Instruments. These educational activities engage teachers and students in the current happenings aboard the international space station, inspiring the next generation of space explorers.

  9. SKI SITE-94, deep repository performance assessment project, summary

    International Nuclear Information System (INIS)

    1999-01-01

    SITE-94 is a comprehensive performance assessment exercise for a hypothetical repository for spent nuclear fuel at a real site in Sweden. SITE-94 was carried out to develop the capability and tools to enable Swedish Nuclear Power Inspectorate (SKI) to review fully the proposals for a deep repository which are expected to be made by the Swedish Nuclear Fuel and Waste Management Company, SKB (the implementor). Sweden is one of the leading countries in the research and development of geological disposal of radioactive waste. The developed methodology for performance assessment has attracted interests from other countries. The Summary of the main report of the SITE-94 project is translated here into Japanese to allow to make the information on the methodology and the related issues available among Japanese concerned. (author)

  10. UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site

  11. Algological studies on the site of the Fessenheim nuclear power station

    International Nuclear Information System (INIS)

    Pierre, J.F.

    1980-01-01

    Systematic study of the algal flora at five stations situated on both sides of the nuclear power station at Fessenheim (department of Haut-Rhin, France). The analysis of the diatomaceae populations in 1977 and 1978, i.e. before and after the start of the reactors, does not indicate, in the composition and abundance of algae, any modifications susceptible to be directly connected to the implantation of the nuclear power station [fr

  12. USRCRN Station Information

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Documentation of United States Regional Climate Reference Network (USRCRN) installations in 2009. Installations documented are for USRCRN pilot project stations in...

  13. 76 FR 79228 - Combined Licenses at William States Lee III Nuclear Station Site, Units 1 and 2; Duke Energy...

    Science.gov (United States)

    2011-12-21

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 52-018 and 52-019; NRC-2008-0170] Combined Licenses at William States Lee III Nuclear Station Site, Units 1 and 2; Duke Energy Carolinas, LLC AGENCY: Nuclear.... SUMMARY: Notice is hereby given that the U.S. Nuclear Regulatory Commission (NRC) and the U.S. Army Corps...

  14. 47 CFR 73.1201 - Station identification.

    Science.gov (United States)

    2010-10-01

    ... public file. The notice must state that the station's public file is available for inspection and that consumers can view it at the station's main studio and on its Web site. At least one of the announcements...

  15. Critical management practices influencing on-site waste minimization in construction projects.

    Science.gov (United States)

    Ajayi, Saheed O; Oyedele, Lukumon O; Bilal, Muhammad; Akinade, Olugbenga O; Alaka, Hafiz A; Owolabi, Hakeem A

    2017-01-01

    As a result of increasing recognition of effective site management as the strategic approach for achieving the required performance in construction projects, this study seeks to identify the key site management practices that are requisite for construction waste minimization. A mixed methods approach, involving field study and survey research were used as means of data collection. After confirmation of construct validity and reliability of scale, data analysis was carried out through a combination of Kruskal-Wallis test, descriptive statistics and exploratory factor analysis. The study suggests that site management functions could significantly reduce waste generation through strict adherence to project drawings, and by ensuring fewer or no design changes during construction process. Provision of waste skips for specific materials and maximisation of on-site reuse of materials are also found to be among the key factors for engendering waste minimization. The result of factor analysis suggests four factors underlying on-site waste management practices with 96.093% of total variance. These measures include contractual provisions for waste minimization, waste segregation, maximisation of materials reuse and effective logistic management. Strategies through which each of the underlying measures could be achieved are further discussed in the paper. Findings of this study would assist construction site managers and other site operatives in reducing waste generated by construction activities. Copyright © 2016 Elsevier Ltd. All rights reserved.

  16. Utilities respond to nuclear station blackout rule

    International Nuclear Information System (INIS)

    Rubin, A.M.; Beasley, B.; Tenera, L.P.

    1990-01-01

    The authors discuss how nuclear plants in the United States have taken actions to respond to the NRC Station Blackout Rule, 10CFR50.63. The rule requires that each light water cooled nuclear power plant licensed to operate must be able to withstand for a specified duration and recover from a station blackout. Station blackout is defined as the complete loss of a-c power to the essential and non-essential switch-gear buses in a nuclear power plant. A station blackout results from the loss of all off-site power as well as the on-site emergency a-c power system. There are two basic approaches to meeting the station blackout rule. One is to cope with a station blackout independent of a-c power. Coping, as it is called, means the ability of a plant to achieve and maintain a safe shutdown condition. The second approach is to provide an alternate a-c power source (AAC)

  17. Establishment of Karadeniz Technical University Permanent GNSS Station as Reactivated of TRAB IGS Station

    Directory of Open Access Journals (Sweden)

    Kazancı Selma Zengin

    2017-12-01

    Full Text Available In recent years, Global Navigation Satellite Systems (GNSS have gained great importance in terms of the benefi ts it provides such as precise geodetic point positioning, determining crustal deformations, navigation, vehicle monitoring systems and meteorological applications etc. As in Turkey, for this purpose, each country has set up its own GNSS station networks like Turkish National Permanent RTK Network analyzed precise station coordinates and velocities together with the International GNSS Service, Turkish National Fundamental GPS Network and Turkish National Permanent GNSS Network (TNPGN stations not only are utilized as precise positioning but also GNSS meteorology studies so total number of stations are increased. This work is related to the reactivated of the TRAB IGS station which was established in Karadeniz Technical University, Department of Geomatics Engineering. Within the COST ES1206 Action (GNSS4SWEC KTU analysis center was established and Trop-NET system developed by Geodetic Observatory Pecny (GOP, RIGTC in order to troposphere monitoring. The project titled “Using Regional GNSS Networks to Strengthen Severe Weather Prediction” was accepted to the scientifi c and technological research council of Turkey (TUBITAK. With this project, we will design 2 new constructed GNSS reference station network. Using observation data of network, we will compare water vapor distribution derived by GNSS Meteorology and GNSS Tomography. At this time, KTU AC was accepted as E-GVAP Analysis Centre in December 2016. KTU reference station is aimed to be a member of the EUREF network with these studies.

  18. Establishment of Karadeniz Technical University Permanent GNSS Station as Reactivated of TRAB IGS Station

    Science.gov (United States)

    Kazancı, Selma Zengin; Kayıkçı, Emine Tanır

    2017-12-01

    In recent years, Global Navigation Satellite Systems (GNSS) have gained great importance in terms of the benefi ts it provides such as precise geodetic point positioning, determining crustal deformations, navigation, vehicle monitoring systems and meteorological applications etc. As in Turkey, for this purpose, each country has set up its own GNSS station networks like Turkish National Permanent RTK Network analyzed precise station coordinates and velocities together with the International GNSS Service, Turkish National Fundamental GPS Network and Turkish National Permanent GNSS Network (TNPGN) stations not only are utilized as precise positioning but also GNSS meteorology studies so total number of stations are increased. This work is related to the reactivated of the TRAB IGS station which was established in Karadeniz Technical University, Department of Geomatics Engineering. Within the COST ES1206 Action (GNSS4SWEC) KTU analysis center was established and Trop-NET system developed by Geodetic Observatory Pecny (GOP, RIGTC) in order to troposphere monitoring. The project titled "Using Regional GNSS Networks to Strengthen Severe Weather Prediction" was accepted to the scientifi c and technological research council of Turkey (TUBITAK). With this project, we will design 2 new constructed GNSS reference station network. Using observation data of network, we will compare water vapor distribution derived by GNSS Meteorology and GNSS Tomography. At this time, KTU AC was accepted as E-GVAP Analysis Centre in December 2016. KTU reference station is aimed to be a member of the EUREF network with these studies.

  19. Beaver Valley Power Station and Shippingport Atomic Power Station. 1977 annual environmental report: radiological. Volume 2

    International Nuclear Information System (INIS)

    1978-01-01

    The environmental monitoring conducted during 1977 in the vicinity of the Beaver Valley Power Station and the Shippingport Atomic Power Station is described. The environmental monitoring program consists of onsite sampling of water, gaseous, and air effluents, as well as offsite monitoring of water, air, river sediments, and radiation levels in the vicinity of the site. The report discusses releases of small quantities of radioactivity to the Ohio River from the Beaver Valley Power Station and Shippingport Atomic Power Station during 1977

  20. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    2000-01-01

    The Quality Assurance Project Plan (QAPjP) has been prepared for waste characterization activities to be conducted by the Transuranic (TRU) Project at the Hanford Site to meet requirements set forth in the Waste Isolation Pilot Plan (WIPP) Hazardous Waste Facility Permit, 4890139088-TSDF, Attachment B, including Attachments B1 through B6 (WAP) (DOE, 1999a). The QAPjP describes the waste characterization requirements and includes test methods, details of planned waste sampling and analysis, and a description of the waste characterization and verification process. In addition, the QAPjP includes a description of the quality assurance/quality control (QA/QC) requirements for the waste characterization program. Before TRU waste is shipped to the WIPP site by the TRU Project, all applicable requirements of the QAPjP shall be implemented. Additional requirements necessary for transportation to waste disposal at WIPP can be found in the ''Quality Assurance Program Document'' (DOE 1999b) and HNF-2600, ''Hanford Site Transuranic Waste Certification Plan.'' TRU mixed waste contains both TRU radioactive and hazardous components, as defined in the WLPP-WAP. The waste is designated and separately packaged as either contact-handled (CH) or remote-handled (RH), based on the radiological dose rate at the surface of the waste container. RH TRU wastes are not currently shipped to the WIPP facility

  1. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    Energy Technology Data Exchange (ETDEWEB)

    Ewy, Ann; Hays, David [U.S. Army Corps of Engineers (United States)

    2013-07-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  2. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    International Nuclear Information System (INIS)

    Ewy, Ann; Hays, David

    2013-01-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  3. Distinguishing Two Ammonium and Triazolium Sites of Interaction in a Three-Station [2]Rotaxane Molecular Shuttle.

    Science.gov (United States)

    Waelès, Philip; Fournel-Marotte, Karine; Coutrot, Frédéric

    2017-08-25

    This paper reports on the synthesis of a tri-stable [2]rotaxane molecular shuttle, in which the motion of the macrocycle is triggered by either selective protonation/deprotonation or specific carbamoylation/decarbamoylation of an alkylbenzylamine. The threaded axle is surrounded by a dibenzo[24]crown[8] (DB24C8) macrocycle and contains three sites of different binding affinities towards the macrocycle. An N-methyltriazolium moiety acts as a molecular station that has weak affinity for the DB24C8 macrocycle and is located in the centre of the molecular axle. Two other molecular stations, arylammonium and alkylbenzylammonium moieties, sit on either side of the triazolium moiety along the molecular axle and have stronger affinities for the DB24C8 macrocycle. These two ammonium moieties are covalently linked to two different stopper groups at each extremity of the thread: a tert-butylphenyl group and a substituted DB24C8 unit. Owing to steric hindrance, the former does not allow any π-π stacking interactions with the encircling DB24C8 macrocycle, whereas the latter residue does; therefore, this allows the discrimination of the two ammonium stations by the surrounding DB24C8 macrocycle in the fully protonated state. In the deprotonated state, the contrasting reactivity of the amine functional groups, as either a base or a nucleophile, allows for selective reactions that trigger the controlled shuttling of the macrocycle around the three molecular stations. © 2017 Wiley-VCH Verlag GmbH & Co. KGaA, Weinheim.

  4. Sexual health promotion on social networking sites: a process evaluation of The FaceSpace Project.

    Science.gov (United States)

    Nguyen, Phuong; Gold, Judy; Pedrana, Alisa; Chang, Shanton; Howard, Steve; Ilic, Olivia; Hellard, Margaret; Stoove, Mark

    2013-07-01

    This article reports findings from an evaluation of reach and engagement of The FaceSpace Project, a novel sexual health promotion project delivered through social networking sites that targeted young people aged 16-29 years. Multiple methods were used to evaluate project reach and engagement. The evaluation focussed on quantitative data (online usage statistics, online surveys), complemented by available qualitative data (project team meeting notes). The project reached 900 fans who were mostly between 18 and 34 years of age. The most successful ways of increasing audience reach were via Facebook advertisements and tagging photos of young people attending a music festival on the project Facebook page. Peaks in Facebook page interactions (comments and "likes") coincided with recruitment peaks and when videos were posted. However, video views varied greatly between postings. Feedback from the project team for increasing engagement in future social networking site interventions included having one centralized Facebook page and using episodic videos. This evaluation is among the first to assess the use of social networking sites for sexual health promotion and provides information to inform the implementation and evaluation of future projects using new media. Social networking sites offer great potential to reach and engage young people for sexual health promotion. However, further work is required to improve implementation and promote audience reach and engagement as well as to determine effectiveness of social networking sites in changing knowledge, attitudes, and behaviors. Copyright © 2013 Society for Adolescent Health and Medicine. Published by Elsevier Inc. All rights reserved.

  5. SKI SITE-94. Deep Repository Performance Assessment Project Volume I and II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    The function of SITE-94 is to provide the Swedish Nuclear Power Inspectorate (SKI) with the capacity and supporting knowledge needed for reviewing the Swedish nuclear industry`s R and D programs and for reviewing license applications, as stipulated in Swedish legislation. The report is structured as a Performance Assessment exercise needed for input to decisions regarding repository safety, but the SITE-94 is not a safety assessment or a model for future assessments to be undertaken by the prospective licensee. The specific project objectives of SITE-94 comprise site evaluation, performance assessment methodology, canister integrity and radionuclide release and transport calculations. The report gives a detailed description of the many inter-related studies undertaken as part of the research project. As a general conclusion it is noted that the SITE-94 project has significantly advanced SKI`s capability of reviewing performance assessments and has led to the development of a tool-kit for carrying out assessment calculations, both in terms of numerical and scoping analyses. The study has highlighted a number of key issues for safety assessment (and consequently for disposal system design): Canister performance; Derived parameters of geosphere retention properties; Spatial variability of groundwater flow and geochemistry of migration paths; Time dependency (more emphasis on transient, time-dependent processes); Buffer evolution over long time. 488 refs.

  6. SKI SITE-94. Deep Repository Performance Assessment Project Volume I and II

    International Nuclear Information System (INIS)

    1996-12-01

    The function of SITE-94 is to provide the Swedish Nuclear Power Inspectorate (SKI) with the capacity and supporting knowledge needed for reviewing the Swedish nuclear industry's R and D programs and for reviewing license applications, as stipulated in Swedish legislation. The report is structured as a Performance Assessment exercise needed for input to decisions regarding repository safety, but the SITE-94 is not a safety assessment or a model for future assessments to be undertaken by the prospective licensee. The specific project objectives of SITE-94 comprise site evaluation, performance assessment methodology, canister integrity and radionuclide release and transport calculations. The report gives a detailed description of the many inter-related studies undertaken as part of the research project. As a general conclusion it is noted that the SITE-94 project has significantly advanced SKI's capability of reviewing performance assessments and has led to the development of a tool-kit for carrying out assessment calculations, both in terms of numerical and scoping analyses. The study has highlighted a number of key issues for safety assessment (and consequently for disposal system design): Canister performance; Derived parameters of geosphere retention properties; Spatial variability of groundwater flow and geochemistry of migration paths; Time dependency (more emphasis on transient, time-dependent processes); Buffer evolution over long time. 488 refs

  7. Lessons Learned from the On-Site Disposal Facility at Fernald Closure Project

    International Nuclear Information System (INIS)

    Kumthekar, U.A.; Chiou, J.D.

    2006-01-01

    The On-Site Disposal Facility (OSDF) at the U.S. Department of Energy's (DOE) Fernald Closure Project near Cincinnati, Ohio is an engineered above-grade waste disposal facility being constructed to permanently store low level radioactive waste (LLRW) and treated mixed LLRW generated during Decommissioning and Demolition (D and D) and soil remediation performed in order to achieve the final land use goal at the site. The OSDF is engineered to store 2.93 million cubic yards of waste derived from the remediation activities. The OSDF is intended to isolate its LLRW from the environment for at least 200 years and for up to 1,000 years to the extent practicable and achievable. Construction of the OSDF started in 1997 and waste placement activities will complete by the middle of April 2006 with the final cover (cap) placement over the last open cell by the end of Spring 2006. An on-site disposal alternative is considered critical to the success of many large-scale DOE remediation projects throughout the United States. However, for various reasons this cost effective alternative is not readily available in many cases. Over the last ten years Fluor Fernald Inc. has cumulated many valuable lessons learned through the complex engineering, construction, operation, and closure processes of the OSDF. Also in the last several years representatives from other DOE sites, State agencies, as well as foreign government agencies have visited the Fernald site to look for proven experiences and practices, which may be adapted for their sites. This paper present a summary of the major issues and lessons leaned at the Fernald site related to engineering, construction, operation, and closure processes for the disposal of remediation waste. The purpose of this paper is to share lessons learned and to benefit other projects considering or operating similar on-site disposal facilities from our successful experiences. (authors)

  8. Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Irene Farnham

    2011-05-01

    This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.

  9. Shippingport station communications program

    International Nuclear Information System (INIS)

    Stote, J.J.

    1988-01-01

    At the Shippingport Station Decommissioning Project, the central idea of the communications program that was developed for use was purposely designed to be as uncomplicated as possible. The central theme, that was developed and communicated, is that all nuclear plants will someday need to be retired and also decommissioned. The Shippingport Plant, originally constructed as a demonstration nuclear power plant, was now being decommissioned as a demonstration to the world-wide nuclear industry that this evolution can be done in a safe and cost-effective manner. Furthermore, the technology currently exists to complete this process. The new phase of the communications program was initiated even before the responsibility for the plant was transferred from Duquesne Light to GE. With such a change forthcoming, it was necessary to inform local officials of these plans, and the reasons for them. Equally important was the need to inform a variety of agencies and offices in the three-state area of the changes, and the continuing need to involve them in the Site Emergency Plan. This document was also revised in recognition of changing site conditions, as well as the changes in responsibility. 1 ref

  10. The Swedish Research Infrastructure for Ecosystem Science - SITES

    Science.gov (United States)

    Lindroth, A.; Ahlström, M.; Augner, M.; Erefur, C.; Jansson, G.; Steen Jensen, E.; Klemedtsson, L.; Langenheder, S.; Rosqvist, G. N.; Viklund, J.

    2017-12-01

    The vision of SITES is to promote long-term field-based ecosystem research at a world class level by offering an infrastructure with excellent technical and scientific support and services attracting both national and international researchers. In addition, SITES will make data freely and easily available through an advanced data portal which will add value to the research. During the first funding period, three innovative joint integrating facilities were established through a researcher-driven procedure: SITES Water, SITES Spectral, and SITES AquaNet. These new facilities make it possible to study terrestrial and limnic ecosystem processes across a range of ecosystem types and climatic gradients, with common protocols and similar equipment. In addition, user-driven development at the nine individual stations has resulted in e.g. design of a long-term agricultural systems experiment, and installation of weather stations, flux systems, etc. at various stations. SITES, with its integrative approach and broad coverage of climate and ecosystem types across Sweden, constitutes an excellent platform for state-of-the-art research projects. SITES' support the development of: A better understanding of the way in which key ecosystems function and interact with each other at the landscape level and with the climate system in terms of mass and energy exchanges. A better understanding of the role of different organisms in controlling different processes and ultimately the functioning of ecosystems. New strategies for forest management to better meet the many and varied requirements from nature conservation, climate and wood, fibre, and energy supply points of view. Agricultural systems that better utilize resources and minimize adverse impacts on the environment. Collaboration with other similar infrastructures and networks is a high priority for SITES. This will enable us to make use of each others' experiences, harmonize metadata for easier exchange of data, and support each

  11. CanWEA regional issues and wind energy project siting : mountainous areas

    Energy Technology Data Exchange (ETDEWEB)

    D' Entremont, M. [Jacques Whitford Ltd., Vancouver, BC (Canada)]|[Axys Environmental Consulting Ltd., Vancouver, BC (Canada)

    2008-07-01

    Planning and permitting considerations for wind energy project siting in mountainous areas were discussed. Mountainous regions have a specific set of environmental and socio-economic concerns. Potential disruptions to wildlife, noise, and visual impacts are a primary concern in the assessment of potential wind farm projects. Alpine habitats are unique and often contain fragile and endangered species. Reclamation techniques for mountainous habitats have not been extensively tested, and the sites are not as resilient as sites located in other ecosystems. In addition, alpine habitats are often migratory corridors and breeding grounds for threatened or endangered birds. In the winter months, alpine habitats are used by caribou, grizzly bears, and wolverine dens. Bats are also present at high elevations. It is often difficult to conduct baseline and monitoring studies in mountainous areas since alpine habitat is subject to rapid weather changes, and has a very short construction period. tabs., figs.

  12. Merchant funding for power stations

    International Nuclear Information System (INIS)

    Johnston, B.; Bartlam, M.

    1997-01-01

    The next frontier for project finance is merchant generation: the financing of IPPs without long-term offtake contracts. Banks are just beginning to finance merchant generation power stations. One of the first was Destec's Indian Queens project in Cornwall, UK. Bruce Johnston and Martin Bartlam of Wilde Sapte discuss the project. (UK)

  13. The project on site - setting the scene for successful industrial relations

    International Nuclear Information System (INIS)

    Morris, D.; Kershaw, A.R.

    1989-01-01

    The site construction performance at Torness and Heysham 2 has been described in various other papers during the Conference and in common with other large projects undertaken over the last 20 years a final judgement will be made as to whether, in simple terms, they were ''good'' or ''bad'' sites. Although there are many individuals or organisations who may make this judgement, it is unlikely that the basic conclusion will differ. What may differ however is the list of reasons that will be advanced to explain the final result. Looking at the investigations made into past projects, the reasons advanced for their success or otherwise can range from the geographical location of the site to material delivery problems, design changes, safety issues, or even the state of the overall national economic climate during the period under scrutiny. Where industrial relations problems are singled out, they can usually be linked to one or more of the factors mentioned. When looking at the complexity of projects such as Torness and Heysham, it is to be expected that unlooked for difficulties and problems will always arise but it is equally true that there is sufficient experience and expertise available in the industry for many possible problem areas to be anticipated and ''designed'' out before work even commences on site. This paper will be looking at the clients' role in creating a suitable environment for contractors to fully manage all aspects of their site operation and to ensure that acute problems can receive the full attention of all parties and not have to be set against a continuing background of unnecessary irritations. (author)

  14. Implementation of advanced LCNG fueling infrastructure in Texas along the I-35/NAFTA Clean Corridor Project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, Stan; Hightower, Jared; Knight, Koby

    2001-05-01

    This report documents the process of planning, siting, and permitting recent LCNG station projects; identifying existing constraints in these processes, and recommendations for improvements; LCNG operating history.

  15. Establishing a reference rock site for the site effect study in and around the Kathmandu valley, Nepal

    Science.gov (United States)

    Bhattarai, Mukunda; Adhikari, Lok Bijaya; Gautam, Umesh Prasad; Bollinger, Laurent; Hernandez, Bruno; Yokoi, Toshiaki; Hayashida, Takumi

    2016-05-01

    We propose a reference site for the site effect study in and around the Kathmandu valley, Nepal. The used data were the accelerograms recorded at two stations, DMG and KKA, and velocity seismograms co-recorded at the PKIN station during nine shallow local and regional earthquakes of local magnitude equal to or greater than 5.0. The DMG station is located on the thick sediments of the Kathmandu valley, whereas the others are rock sites. The KKA station is located on the granite and gneisses of the Shivapuri Lekh about 10 km northwest of the capital, and the PKIN station is in the tunnel of an old iron mine on the southern slope of the Phulchauki Hill about 15 km southeast. The spectral ratios of the ground motion records of the DMG station compared to those of the PKIN station, for all considered earthquakes, confirm that the DMG station has amplification ranging from 1 to 10 in the frequency range of 0.5-10 Hz, and spectral ratios of the KKA station referenced by the PKIN station show that the KKA station has significant amplification in the frequency range of 4-10 Hz and the peak value of the spectral ratio is at most over 25. Therefore, the site amplification in and around Kathmandu valley would be significantly underestimated in the frequency range from 4 to 10 Hz if the records of the KKA station were used as a proxy for input seismic motions to the sediment. Based on the above analysis, we propose that the PKIN station should be considered as a reliable reference site for the assessment of seismic hazards in and around the Kathmandu valley.

  16. The Cigeo project: an industrial storage site for radioactive wastes in deep underground

    International Nuclear Information System (INIS)

    Krieguer, Jean-Marie

    2017-01-01

    In 2006, France has decided to store its high-level and long-lived radioactive wastes, mostly issued from the nuclear industry, in a deep geological underground disposal site. This document presents the Cigeo project, a deep underground disposal site (located in the East of France) for such radioactive wastes, which construction is to be started in 2021 (subject to authorization in 2018). After a brief historical review of the project, started 20 years ago, the document presents the radioactive waste disposal context, the ethical choice of underground storage (in France and elsewhere) for these types of radioactive wastes, the disposal site safety and financing aspects, the progressive development of the underground facilities and, of most importance, its reversibility. In a second part, the various works around the site are presented (transport, buildings, water and power supply, etc.) together with a description of the various radioactive wastes (high and intermediate level and long-lived wastes and their packaging) that will be disposed in the site. The different steps of the project are then reviewed (the initial design and initial construction phases, the pilot industrial phase (expected in 2030), the operating phase, and the ultimate phases that will consist in the definitive closure of the site and its monitoring), followed by an extensive description of the various installations of surface and underground facilities, their architecture and their equipment

  17. Latest development in project site radwaste treatment facility (SRTF) Sanmen

    International Nuclear Information System (INIS)

    Mennicken, K.; Lohmann, P.

    2015-01-01

    Westinghouse Electric Germany GmbH (WEG) was successful in being awarded a contract as to the planning, delivery, installation and commissioning of radwaste treatment systems for the AP1000 units at Sanmen site, PR China. Operational low and intermediate level radioactive waste will be processed in the Site Radwaste Treatment Facility (SRTF). This paper explains the latest developments of the project, especially the experience with customer-hired Chinese planning partners, installation companies and Customer operating personnel. (authors)

  18. UMTRA Project water sampling and analysis plan, Salt Lake City, Utah. Revision 1

    International Nuclear Information System (INIS)

    1995-06-01

    This water sampling and analysis plan describes planned, routine ground water sampling activities at the US Department of Energy Uranium Mill Tailings Remedial Action Project site in Salt Lake City, Utah. This plan identifies and justifies sampling locations, analytical parameters, detection limits, and sampling frequencies for routine monitoring of ground water, sediments, and surface waters at monitoring stations on the site

  19. Information on the technical site visit to the primary seismic station in Nairobi

    International Nuclear Information System (INIS)

    Kianji, G.; Nyali, H.

    2002-01-01

    In 1963 the World Wide Standardized Seismograph Station (WWSSN) was installed at the University of Nairobi (UoN) Department of Geology by the United States Geological Survey (USGS). Due to increased background seismic noise as a result of expanding infrastructure, the station was moved to Kilimambogo in 1994 and subsequently upgraded to IRIS digital station by the USGS. On the formation of CTBTO this tunnel type station was upgraded to the CTBTO standards. The system components and utilities are described. Comparison of data transmission through radio link at the University of Nairobi and the central station is provided. A map showing the location of the recent Tanzania earthquake incorporating CTBTO data and that of the local station is included

  20. Hydrologic site characterization - the UMTRA project approach

    International Nuclear Information System (INIS)

    Binkman, J.E.; Hoopes, J.R.

    1985-01-01

    The United States Environmental Protection Agency (EPA) Standards (40 CFR 192) require site characterization of the hydrogeologic regime at and around each Uranium Mill Tailings Remedial Action (UMTRA) Project site. Also, ''judgements on the possible need for remedial or protective actions for groundwater aquifers should be guided by relevant considerations described in EPA's hazardous waste management system (47 CFR 32274).'' To address those two sets of rules and regulations, a generic approach is being developed. Fourteen primary issues were determined. These issues can be grouped into those that can be determined by documentation of available information and present conditions, those that require extensive field investigations and those that require some form of predictive modeling. To address the various issues requires an integrated effort of hydrogeologists, environmental engineers or scientists and health physicists. In this paper, the approach to the resolution of these fourteen issues is described briefly

  1. GENISES: A GIS Database for the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Beckett, J.

    1991-01-01

    This paper provides a general description of the Geographic Nodal Information Study and Evaluation System (GENISES) database design. The GENISES database is the Geographic Information System (GIS) component of the Yucca Mountain Site Characterization Project Technical Database (TDB). The GENISES database has been developed and is maintained by EG ampersand G Energy Measurements, Inc., Las Vegas, NV (EG ampersand G/EM). As part of the Yucca Mountain Project (YMP) Site Characterization Technical Data Management System, GENISES provides a repository for geographically oriented technical data. The primary objective of the GENISES database is to support the Yucca Mountain Site Characterization Project with an effective tool for describing, analyzing, and archiving geo-referenced data. The database design provides the maximum efficiency in input/output, data analysis, data management and information display. This paper provides the systematic approach or plan for the GENISES database design and operation. The paper also discusses the techniques used for data normalization or the decomposition of complex data structures as they apply to GIS database. ARC/INFO and INGRES files are linked or joined by establishing ''relate'' fields through the common attribute names. Thus, through these keys, ARC can allow access to normalized INGRES files greatly reducing redundancy and the size of the database

  2. Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

    International Nuclear Information System (INIS)

    Grecheck, Eugene S.; Batalo, David P.

    2010-01-01

    This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

  3. The Palo Verde story: a foundation for future multi-station nuclear power plants

    International Nuclear Information System (INIS)

    Brunt, Jr.E.E.Van; Ferguson, C.

    1987-01-01

    In 1973, the design and planning for the Palo Verde Nuclear Generating Station Was started featuring three 3800 MWt Combustion Engineering Standard System 80 Nuclear Steam Supply Systems. Arizona Public Service Company (APS) was the Project Manager and Operating Agent and Bechtel Power Corporation the architect/engineer and constructor. The Palo Verde units are located in a desert environment some 50 miles west of Phoenix, Arizona. It is a 'dry site' in that there are no liquid discharges from the site. The cooling tower makeup water sewage is waste effluent from the City of Phoenix treated at an on site reclamation facility. The effluent has had primary and secondary treatment at the Phoenix plant prior to delivery to PVNGS. The units are physically separate from each other but are of identical design. There are no shared safety systems between the units. Unit 1 and Unit 2 are both in commercial operation (January, 1986 and September, 1986 respectively). Unit 3 is scheduled to load fuel late in the first quarter of 1987. This paper presents some of the engineering and management practices used during design, construction, and startup and operational experiences and other unique features of this multi-unit nuclear station. The site arrangement is shown in Figure 1

  4. Iterative performance assessments as a regulatory tool for evaluating repository safety: How experiences from SKI Project-90 were used in formulating the new performance assessment project SITE-94

    International Nuclear Information System (INIS)

    Andersson, J.

    1993-01-01

    The Swedish Nuclear Power Inspectorate, SKI, regulatory research program has to prepare for the process of licensing a repository for spent nuclear fuel, by building up the necessary knowledge and review capacity. SKIs main strategy for meeting this demand is to develop an independent performance assessment capability. SKIs first own performance assessment project, Project-90, was completed in 1991 and is now followed by a new project, SITE-94. SITE-94 is based on conclusions reached within Project-90. An independent review of Project-90, carried out by a NEA team of experts, has also contributed to the formation of the project. Another important reason for the project is that the implementing organization in Sweden, SKB, has proposed to submit an application to start detailed investigation of a repository candidate site around 1997. SITE-94 is a performance assessment of a hypothetical repository at a real site. The main objective of the project is to determine how site specific data should be assimilated into the performance assessment process, and to evaluate how uncertainties inherent in site characterization will influence performance assessment results. This will be addressed by exploring multiple interpretations, conceptual models, and parameters consistent with the site data. The site evaluation will strive for consistency between geological, hydrological, rock mechanical, and geochemical descriptions. Other important elements of SITE-94 are the development of a practical and defensible methodology for defining, constructing and analyzing scenarios, the development of approaches for treatment of uncertainties, evaluation of canister integrity, and the development and application of an appropriate quality assurance plan for performance assessments

  5. Minimization of green house gases emission by using hybrid energy system for telephony base station site application

    International Nuclear Information System (INIS)

    Nema, Pragya; Rangnekar, Saroj; Nema, R.K.

    2010-01-01

    Cellular mobile service is a rapidly expanding and a very competitive business worldwide, including developing countries. This paper proposes that the suitable alternative solution of grid power is the stand-alone PV/wind hybrid energy system with diesel generator as a backup for cellular mobile telephony base station site in isolated areas. It is expected that the newly developed and installed system would provide very good opportunities for mobile telephony base station in near future. In addition, protecting the environment and combating climate change are two of the most pressing challenges facing humankind. As energy prices soar, network operators are increasingly scrutinizing their environmental and social responsibilities. This system will be more cost effective and environmental friendly over the conventional diesel generator. Approximately 70-80% fuel cost over conventional diesel generator and the emission of CO 2 and other harmful gasses in environments were reduced. (author)

  6. Project licensing plan for UMTRA [Uranium Mill Tailings Remedial Action] sites

    International Nuclear Information System (INIS)

    1984-07-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Licensing Plan is to establish how a disposal site will be licensed, and to provide responsibilities of participatory agencies as legislated by the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (Public Law 95-604). This Plan has been developed to ensure that the objectives of licensing are met by identifying the necessary institutional controls, participatory agency responsibilities, and key milestones in the licensing process. The Plan contains the legislative basis for and a description of the licensing process (''Process'') for UMTRA sites. This is followed by a discussion of agency responsibilities, and milestones in the Process. The Plan concludes with a generic timeline of this Process. As discussed in Section 2.1, a custodial maintenance and surveillance plan will constitute the basis for a site license. The details of maintenance and surveillance are discussed in the Project Maintenance and Surveillance Plan (AL-350124.0000). 5 refs., 4 figs

  7. Policy and procedures for classification of Class III groundwater at UMTRA Project sites

    International Nuclear Information System (INIS)

    1989-03-01

    The US Environmental Protection Agency (EPA) has recently proposed groundwater regulations for the US Department of Energy's )DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. These regulations allow the application of supplemental standards at UMTRA Project sites in specific situations. The designation of groundwater as Class III permits the application of supplemental standards. This document discusses a final UMTRA Project policy and procedures for identifying Class III groundwater, including identification of a review area, definition of water quality, quantification of aquifer yield, and identification of methods reasonably employed for public water supply systems. These items, either individually or collectively, need to be investigated in order to determine if groundwaters at UMTRA Project sites are Class III. This document provides a framework for the DOE to determine Class III groundwaters

  8. Islands for nuclear power stations

    International Nuclear Information System (INIS)

    Usher, E.F.F.W.; Fraser, A.P.

    1981-01-01

    The safety principles, design criteria and types of artificial island for an offshore nuclear power station are discussed with particular reference to siting adjacent to an industrial island. The paper concludes that the engineering problems are soluble and that offshore nuclear power stations will eventually be built but that much fundamental work is still required. (author)

  9. Behavioural changes experienced by contract managers while working on remote project sites

    OpenAIRE

    2012-01-01

    M.B.A. This research project is concerned with the behavioural changes of contract managers while working on 'remote' project sites. While working on such a project, the researcher became aware that the behaviour of certain contract managers changed over the course of the project, and that this behaviour was not the same as they demonstrated when at home or in the office environment. In many instances these behavioural changes were of a negative nature, the consequences of which often resu...

  10. Monitoring of Electromagnetic Radiation from Cellular Base Stations in Kuwait

    International Nuclear Information System (INIS)

    Al-Otaibi, A.H.; Al-Ajmi, D.; Williams, T.; McGee, D.; Dennis, J.A.; Beg, M.U.

    1998-01-01

    A survey of the radio frequency electromagnetic environment in Kuwait was carried out. The primary purpose of this survey was to monitor electromagnetic radiation (EMR) field strength levels emitted by cellular base stations installed and operated by the Kuwait Mobile Telecommunications Company (MTC). Measurements were made at 26 cellular-phone base stations, chosen as a representative sample to include 14 school sites, 2 residential sites, 2 hospital sites, 3 ministerial building sites, 3 commercial sites and 1 typical stand-alone site. On all the selected sites measurements were made with a spectrum analyser to determine the emission level in the frequency bands used by the base station transmitters (917-960 MHz). The results indicated that total field strength, specifically due to the MTC base stations, found in public access areas, varied generally between 0.05 and 1.13 V.m -1 . These values are in the order of between 40 and 800 times lower than the new pan-European CENELEC pre-standard ENV 50166-2 'Human Exposure to Electromagnetic Fields'. In terms of power density the highest observed value (0.34 μW.m -2 ) was more than a thousand times below the prescribed standards. (author)

  11. Final work plan: Expedited Site Characterization of the IES Industries, Inc., Site at Marshalltown, Iowa. Ames Expedited Site Characterization Project, Version 1.0

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-04

    The overall goal of the Ames Laboratory Expedited Site Characterization (ESC) project is to evaluate and promote both innovative and state-of-the-practice site characterization and/or monitoring technologies. This will be accomplished by fielding both types of technologies together in the context of an expedited site characterization. The first site will be at a former manufactured gas plant (FMGP) in Marshalltown, Iowa. The project will field three areas of technology: geophysical, analytical, and data fusion. Geophysical technologies are designed to understand the subsurface geology to help predict fate and transport of the target contaminants. Analytical technologies/methods are designed to detect and quantify the target contaminants. Data fusion technology consists of software systems designed to rapidly integrate or fuse all site information into a conceptual site model that then becomes the decision making tool for the site team to plan subsequent sampling activity. Not all of the contaminants present can be located at the action level. Polynuclear aromatic hydrocarbons (PAHs) are the signature organics associated with the coal tar activities that took place at the site. As a result, PAHs were selected as the target compounds. Screening analytical instruments and nonintrusive geophysical techniques will be fielded to qualitatively map the spatial contaminant distribution. Soil gas surveys, immunoassay testing (IMA), innovative optical techniques, and passive organic sorbent sensors will be deployed along with the geophysical methods. Gas chromatography/mass spectrometry (GC/MS) instruments and a cone penetrometer system equipped with a laser-induced fluorescence (LIF) probe will quantitatively map the action level edges of the PAH plume(s). Samples will be taken both by the cone penetrometer test system (CPT) and the Geoprobe {reg_sign} sampler system.

  12. AECB staff annual assessment of the Point Lepreau Nuclear Generating Station for the year 1994

    International Nuclear Information System (INIS)

    1995-06-01

    This report is the Atomic Energy Control Board assessment of safety at Point Lepreau Generating Station for 1994. AECB on-site Project Officers, and Ottawa based specialists monitored the station throughout the year. The station operated safely during 1994. Performance of the special safety systems was very good, and NB Power made important progress improving the safety management of these systems. NB Power staff failed to comply with the conditions of our Operating Licence seven times during 1994. This is an improvement from last year, but the number of compliance problems is still too high. NB Power introduced safety culture training for its staff last year. AECB is optimistic that this will help to improve compliance. The station fully met the radiation safety requirements during the year. Releases of radioactive material to the environment are well below the limits set. Radiation exposure to workers are being well controlled, and AECB believe that NB Power is maintaining these exposures 'As Low As Reasonably Achievable' for this reactor type

  13. Central Station Design Options

    DEFF Research Database (Denmark)

    2011-01-01

    . The work identifies the architecture, sizing and siting of prospective Central Stations in Denmark, which can be located at shopping centers, large car parking lots or gas stations. Central Stations are planned to be integrated in the Danish distribution grid. The Danish island of Bornholm, where a high...... overloading, more reference points might be necessary to represent various transformer loading levels. The subject of safety in Central Station is also addressed. A number of safety rules based on European standards apply to AC charging equipment up to 44 kW. The connection interlock and the automatic de......-energization are identified as fundamental requirements for safety in such a charging station. The connection interlock is a solution which ensures that no power is applied to the DC cable when the EV connector is not connected. The automatic de-energization device ensures that whenever a strain on the cable is detected, e...

  14. Strong-wind events and their influence on the formation of snow dunes: observations from Kohnen station, Dronning Maud Land, Antarctica

    NARCIS (Netherlands)

    Birnbaum, G.; Freitag, J.; Brauner, R.; König-Langlo, G.; Schulz, E.; kipfstuhl, J.; Oerter, H.; Reijmer, C.H.; Schlosser, E.; Faria, S.H.; Ries, H.; Loose, B.; Herber, A.; Duda, M. G.; Powers, J. G.; Manning, K. W.; van den Broeke, M.R.

    2010-01-01

    Analyses of shallow cores obtained at the European Project for Ice Coring in Antarctica (EPICA) drilling site Kohnen station (758000 S, 008040 E; 2892ma.s.l.) on the plateau of Dronning Maud Land reveal the presence of conserved snow dunes in the firn. In situ observations during three dune

  15. ENHANCING EFFECTIVENESS OF EMSP PROJECTS THROUGH STRONG CONNECTIONS TO SITE PROBLEMS

    International Nuclear Information System (INIS)

    Josephson, Gary B.; Hale, Donna

    2003-01-01

    The Environmental Management Science Program (EMSP) funds basic science research that will lead to reduced remediation cost, schedule, technical uncertainties, and risk for DOE's environmental clean up. The Tanks Focus Area (TFA) has partnered with EMSP to accomplish those same objectives for DOE's largest and most expensive remediation effort - to retrieve and immobilize the highly radioactive wastes that are our nation's chief nuclear defense program legacy. TFA has been tasked to facilitate success of the EMSP investment. The key for EMSP projects to contribute to this remediation effort is communication. First, the scientist needs to understand much more about how his scientific results would be used than he could ever learn from the original EMSP solicitation or by reading the referenced DOE needs statements. Second, the scientist's results must be communicated to the site problem holders in a usable form and in a timely manner such that important information gaps can still be filled by the EMSP project. Research results can be used in a variety of ways besides deployment of new hardware or a new process. When results are USED the site problem holders become 'users'. The important aspect that research results are to be used is captured in the TFA lexicon for their clients, the DOE sites--'USERS'. The best method observed, so far, to accomplish the indispensable communication necessary for success is through direct contact between EMSP researchers and TFA/site problem holders, person to person. The observation that direct contact is the best medium for exchange of complex information may seem inanely obvious. However, it is not the normal procedure in the more academic world of the fundamental scientists, where publishing of results in a peer-reviewed journal completes the transmittal of scientific results. Direct communication between EMSP researchers and site users doesn't occur naturally. TFA actively bridges this gap between science and technology

  16. Proposed Construction of Boulder Seismic Station Monitoring Sites, Boulder, Wyoming. Environmental Assessment

    Science.gov (United States)

    2009-02-01

    boreholes at the Boulder Seismic Station for research, development, test, and evaluation (RDT&E) as part of the U.S. Nuclear Treaty monitoring...14 LIST OF FIGURES Figure 1. Location of the proposed Boulder Seismic Station, borehole locations and associated buffers...juncture of Spring Creek and Scab Creek Road (Figure 1). Currently, the Boulder Seismic Station has a 13-element array of seismometers on the property

  17. Field pilot testing for chemical oxidation at the former Nitchequon meteorological station : decontamination project in isolated areas

    Energy Technology Data Exchange (ETDEWEB)

    Peisajovich, A. [Transport Canada, Montreal, PQ (Canada); Bergeron, E. [Golder Associates Ltd., Montreal, PQ (Canada); Barbeau, M. [Golder Associates Innovative Applications, Montreal, PQ (Canada); Lajoie, G. [Cree Regional Authority, Montreal, PQ (Canada)

    2006-07-01

    Field pilot testing for chemical oxidation at the former Nitchequon meteorological station was discussed. This presentation described the site location and provided an aerial view and cross section of the site. The historical background and condition of the site were then identified. Photographs and illustrations of the site and the source of the problem were provided. Photographs were also provided of the logistics, temporary camp, dismantling of tanks, equipment, pipeline dismantling, residues, methodology as well as a graphical representation of how to solve the problem. Other topics included technologies tested on site, full-scale remediation plans, remediation goals, step by step process, and costs distribution. Among the steps discussed was: vegetation removal; excavation of the first two feet of soil; transfer of contaminated soil on high-density polyethylene (HDPE) lining prior to treatment; cell construction; cell lining insulation; transfer of treated soil from the mixers to the curing cells; installation of HDPE top cover lining over the treated soil; and the addition of 12 inches of clean soil over the top cover lining. tabs., figs.

  18. Application for the Tape Station

    CERN Document Server

    Solero, A

    2003-01-01

    The Tape Station is used as an Isolde facility to observe the variations of intensity and the lifespan of certain isotopes. A Siemens Simatic FM-352-5 module controls the Tape Station in a PLC system then a DSC controls the PLC, which will be controlled the Tape station program. During the Isolde consolidation project, the Tape Station has been rebuilt, and the control system has been fully integrated in the PS control. Finally, a new application has been written in JAVA Development kit 1.4 and the PS Java environment. The main purpose of this note is to explain how to use this program.

  19. Fuel Receiving and Storage Station. Nuclear Regulatory Commission's final environmental statement

    International Nuclear Information System (INIS)

    1976-01-01

    The following items are covered: the site, the station, environmental effects of site preparation and station construction, environmental effects of station operation, effluent and environmental monitoring programs, environmental effects of accidents, need for BFRSS, benefit-cost analysis of alternatives, generic environmental impact statements, and discussion of and response to comments received on the draft environmental statement

  20. Proceedings of the Flat-Plate Solar Array Project Research Forum on the Design of Flat-Plate Photovoltaic Arrays for Central Stations

    Science.gov (United States)

    1983-01-01

    The Flat Plate Solar Array Project, focuses on advancing technologies relevant to the design and construction of megawatt level central station systems. Photovoltaic modules and arrays for flat plate central station or other large scale electric power production facilities require the establishment of a technical base that resolves design issues and results in practical and cost effective configurations. Design, qualification and maintenance issues related to central station arrays derived from the engineering and operating experiences of early applications and parallel laboratory reserch activities are investigated. Technical issues are examined from the viewpoint of the utility engineer, architect/engineer and laboratory researcher. Topics on optimum source circuit designs, module insulation design for high system voltages, array safety, structural interface design, measurements, and array operation and maintenance are discussed.

  1. Technical data base quarterly report, April--June 1992; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-09-01

    The acquisition and development of technical data are activities that provide the information base from which the Yucca mountain Site will be characterized and may P-ventually be licensed as a high-level waste repository. The Project Technical Data Base (TDB) is the repository for the regional and site-specific technical data required in intermediate and license application analyses and models. The TDB Quarterly Report provides the mechanism for identifying technical data currently available from the Project TDB. Due to the variety of scientific information generated by YMP activities, the Project TDB consists of three components, each designed to store specific types of data. The Site and Engineering Properties Data Base (SEPDB) maintains technical data best stored in a tabular format. The Geographic Nodal Information Study and Evaluation System (GENISES), which is the Geographic Information System (GIS) component of the Project TDB, maintains spatial or map-like data. The Geologic and Engineering Materials Bibliography of Chemical Species (GEMBOCHS) data base maintains thermodynamic/geochemical data needed to support geochemical reaction models involving the waste package and repository geochemical environment. Each of these data bases are addressed independently within the TDB Quarterly Report.

  2. Naval Station Newport Wind Resource Assessment. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites, and The Naval Facilities Engineering Service Center

    Energy Technology Data Exchange (ETDEWEB)

    Robichaud, R.; Fields, J.; Roberts, J. O.

    2012-02-01

    The U.S. Environmental Protection Agency (EPA) launched the RE-Powering America's Land initiative to encourage development of renewable energy (RE) on potentially contaminated land and mine sites. EPA is collaborating with the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) to evaluate RE options at Naval Station (NAVSTA) Newport in Newport, Rhode Island where multiple contaminated areas pose a threat to human health and the environment. Designated a superfund site on the National Priorities List in 1989, the base is committed to working toward reducing the its dependency on fossil fuels, decreasing its carbon footprint, and implementing RE projects where feasible. The Naval Facilities Engineering Service Center (NFESC) partnered with NREL in February 2009 to investigate the potential for wind energy generation at a number of Naval and Marine bases on the East Coast. NAVSTA Newport was one of several bases chosen for a detailed, site-specific wind resource investigation. NAVSTA Newport, in conjunction with NREL and NFESC, has been actively engaged in assessing the wind resource through several ongoing efforts. This report focuses on the wind resource assessment, the estimated energy production of wind turbines, and a survey of potential wind turbine options based upon the site-specific wind resource.

  3. Ponnequin Wind Energy Project: Reference site avian study, January 1, 1998--December 31, 1998

    Energy Technology Data Exchange (ETDEWEB)

    Kerlinger, P.; Curry, R.; Ryder, R.

    2000-04-05

    This report summarizes the results of surveys completed during the period January 1, 1998, through December 31, 1998, at the Ponnequin Wind Energy Project in Weld County, Colorado. The surveys were conducted at two reference sites, and include a pre-construction avian abundance and use survey and raptor nesting, prey, and carcass surveys. The reference sites were situated immediately to the west of the project site in Weld County, Colorado, and 4.8 kilometers to the north of the site in Laramie County, Wyoming. The surveys were conducted along two 800-meter (m) main transects at each site with two 400-m (by 100-m) perpendicular transects. About 30 complete surveys were completed during the year, with a greater frequency of surveys in the late spring and early autumn. The surveys revealed mostly common species, with no endangered or threatened species on the sites. Small numbers of raptors were observed on or near the project and reference areas. During the winter, avian use and abundance was minimal. Prey species consisted primarily of thirteen-lined ground squirrels and northern pocket gophers. Two songbird carcasses were found. The results of these surveys, combined with data from several more months of surveys, will be compared to surveys conducted after construction of the wind farm.

  4. Ponnequin Wind Energy Project: Reference site avian study, January 1, 1998--December 31, 1998

    International Nuclear Information System (INIS)

    Kerlinger, P.; Curry, R.; Ryder, R.

    2000-01-01

    This report summarizes the results of surveys completed during the period January 1, 1998, through December 31, 1998, at the Ponnequin Wind Energy Project in Weld County, Colorado. The surveys were conducted at two reference sites, and include a pre-construction avian abundance and use survey and raptor nesting, prey, and carcass surveys. The reference sites were situated immediately to the west of the project site in Weld County, Colorado, and 4.8 kilometers to the north of the site in Laramie County, Wyoming. The surveys were conducted along two 800-meter (m) main transects at each site with two 400-m (by 100-m) perpendicular transects. About 30 complete surveys were completed during the year, with a greater frequency of surveys in the late spring and early autumn. The surveys revealed mostly common species, with no endangered or threatened species on the sites. Small numbers of raptors were observed on or near the project and reference areas. During the winter, avian use and abundance was minimal. Prey species consisted primarily of thirteen-lined ground squirrels and northern pocket gophers. Two songbird carcasses were found. The results of these surveys, combined with data from several more months of surveys, will be compared to surveys conducted after construction of the wind farm

  5. Yucca Mountain Site Characterization Project bibliography, July--December 1992: An update, Supplement 3, Addendum 2

    International Nuclear Information System (INIS)

    1993-04-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Energy Science and Technology Database from July 1, 1992, through December 31, 1992. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it

  6. Yucca Mountain Site Characterization Project bibliography, January--June 1995. Supplement 4, Add.3: An update

    Energy Technology Data Exchange (ETDEWEB)

    Stephan, P.M. [ed.

    1996-01-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy`s Energy Science and Technology Database from January 1, 1995, through June 30, 1995. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization`s list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it.

  7. Yucca Mountain Site Characterization Project Bibliography, January--June 1993. An update: Supplement 4, Addendum 1

    Energy Technology Data Exchange (ETDEWEB)

    Stephan, P.M. [ed.

    1995-01-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy`s Energy Science and Technology Database from January 1, 1994 through June 30, 1994. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers,and articles are included in the sponsoring organization`s list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it.

  8. Yucca Mountain Site Characterization Project Bibliography, January--June 1993. An update: Supplement 4, Addendum 1

    International Nuclear Information System (INIS)

    Stephan, P.M.

    1995-01-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Energy Science and Technology Database from January 1, 1994 through June 30, 1994. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers,and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it

  9. Yucca Mountain Site Characterization Project bibliography, January--June 1995. Supplement 4, Add.3: An update

    International Nuclear Information System (INIS)

    Stephan, P.M.

    1996-01-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Energy Science and Technology Database from January 1, 1995, through June 30, 1995. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it

  10. Research from Afar: Considerations for Conducting an Off-Site Research Project.

    Science.gov (United States)

    Williams, Reg Arthur; Hagerty, Bonnie M.; Hoyle, Kenneth; Yousha, Steven M.; Abdoo, Yvonne; Andersen, Curt; Engler, Dorothy

    1999-01-01

    Critical elements in the success of off-site research projects include the following: negotiation, attention to personnel issues, communication, participation of research subjects, data management, and concern for privacy issues. (SK)

  11. UK 2009-2010 repeat station report

    Directory of Open Access Journals (Sweden)

    Thomas J.G. Shanahan

    2013-03-01

    Full Text Available The British Geological Survey is responsible for conducting the UK geomagnetic repeat station programme. Measurements made at the UK repeat station sites are used in conjunction with the three UK magnetic observatories: Hartland, Eskdalemuir and Lerwick, to produce a regional model of the local field each year. The UK network of repeat stations comprises 41 stations which are occupied at approximately 3-4 year intervals. Practices for conducting repeat station measurements continue to evolve as advances are made in survey instrumentation and as the usage of the data continues to change. Here, a summary of the 2009 and 2010 UK repeat station surveys is presented, highlighting the measurement process and techniques, density of network, reduction process and recent results.

  12. Global positioning site environment evaluator

    International Nuclear Information System (INIS)

    Leffler, S.; Reeser, H.G.; Zaker, E.; Hansen, W.; Sikorski, R.W.

    1990-01-01

    Development of an innovative, integrated, automated system (Global Positioning Site Environment Evaluator - GPSEETM) for surveying contaminated waste sites is described. This system makes novel use of the Global Positioning System (GPS) satellite constellation for establishing specific locations and current times for surveying radioactive, hazardous, or mixed-waste sites. GPSEE may also be used for waste site contamination surveys after remediation activities to ensure environmental remediation is complete. A base station is established for collecting and recording data and directing field operations for field stations which may be located many miles from the base station. The field operators collect site surveying and contamination data utilizing a variety of chemical and radiological sensors. A major goal for the data collection process is to collect all data utilizing in situ sensors, thereby minimizing the need for collecting soil and water samples. Site contamination data is transmitted electronically to the base station for recording and processing. The GPSEE system is being developed for use at DOE/DOD and a variety of industrial facilities. 3 figs

  13. The Rocky Flats Environmental Technology Site beryllium characterization project

    International Nuclear Information System (INIS)

    Morrell, D.M.; Miller, J.R.; Allen, D.F.

    1999-01-01

    A site beryllium characterization project was completed at the Rocky Flats Environmental Technology Site (RFETS) in 1997. Information from historical reviews, previous sampling surveys, and a new sampling survey were used to establish a more comprehensive understanding of the locations and levels of beryllium contamination in 35 buildings. A feature of the sampling strategy was to test if process knowledge was a good predictor of where beryllium contamination could be found. Results revealed that this technique was effective at identifying where surface contamination levels might exceed the RFETS smear control level but that it was not effective in identifying where low concentrations of beryllium might be found

  14. Satellite power system (SPS). Rectenna siting: availability and distribution of nominally eligible sites

    Energy Technology Data Exchange (ETDEWEB)

    1980-11-01

    Siting of 60 ground receiving stations (rectennas) for the SPS may pose a problem due to the large area per rectenna (15,000 hectares, 38,000 acres) and numerous siting constraints. This study analyzes areas potentially eligible for rectenna sites by mapping, at a national scale, those conditions which would preclude rectenna construction. These exclusion variables which reflect restricted lands, topography, safety, national policy and electromagnetic (microwave) effects, have been computer encoded and tabulated. Subsequent analysis of the nine electric power planning regions that make up the contiguous states indicate an apparently adequate number of nominally eligible sites in all regions in comparison to projected electrical generation. Eligibility in this context means only that areas were not excluded in this national level analysis; more detailed investigation may reveal purely local constraints or smaller scale exclusions. A second major qualification relates to small isolated eligible areas. Eliminating individual eligible clusters with less than nine times the area of one rectenna eliminates much of the Eastern US; a four-to-one adjacent eligible area test poses no such problem. An independant study of the placement of 60 nominal sites in relation to projected load centers reveals that, even with modest transmission distances, the supply of eligible areas is not a key constraint, except perhaps in the Mid-Atlantic (Electric Reliability) Council Region. Even when several less critical (potential) exclusions are considered, more than 19% of the US is eligible; every region except Mid-Atlantic has at least 50 times an many eligible sites as are required.

  15. Successful community relations efforts at the Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    McKee, James E. Jr.; Meyer, Linda L.

    1992-01-01

    The Weldon Spring Site Remedial Action Project (WSSRAP) Community Relations Program involves many participants from the U.S. Department of Energy (DOE) and the Prime Management Contractor (PMC) composed of M.K. Ferguson and Jacobs Engineering. The proactive community relations plan exceeds the compliance requirements of NEPA and CERCLA and is coordinated by a three-person staff of professional communicators. The program permeates many of the operating decisions and the result has been public acceptance of the Project and its actions to date, which has been to conduct remedial actions that will place the site in a radiologically and chemically safe condition, eliminating potential hazards to the public and environment. (author)

  16. The Sewer Research Station in Frejlev

    DEFF Research Database (Denmark)

    Schaarup-Jensen, Kjeld; Hvitved-Jacobsen, T.

    This report for the 2000 activities at the sewer research station in Frejlev. Only few - if any - sewer monitoring stations like the one in Frejlev exist. Without no doubt the field data produced - especially the time series - in the course of time will serve as a unique basis for projects dealin...

  17. The Sewer Research Station in Frejlev

    DEFF Research Database (Denmark)

    Hvitved-Jacobsen, Thorkild; Schaarup-Jensen, Kjeld

    This report for the 1999 activities at the sewer research station in Frejlev. Only few - if any - sewer monitoring stations like the one in Frejlev exist. Without no doubt the field data produced - especially the time series - in the course of time will serve as a unigue basis for projects dealin...

  18. Site observational work plan for the UMTRA Project site at Tuba City, Arizona

    International Nuclear Information System (INIS)

    1994-09-01

    The requirements for ground water compliance for Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Tuba City, Arizona, site, are found in the Uranium Mill Tailings Radiation Control Act; Subparts B and C of the U.S. Environmental Protection Agency's Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR 192 (1994)), and the associated proposed 1987 standards (52 FR 36000). During the surface remedial action, an estimated 1,400,000 cubic yards (yd 3 ) (1,100,000 cubic meters [m 3 ]) of uranium mill tailings and other contaminated materials were consolidated and stabilized in place in an unlined disposal cell covering 50 acres (20 hectares). The surface remedial action was completed in April 1990. Ground water beneath the Tuba City site was contaminated by subsurface migration of water from uranium ore processing activities. The main source of contaminants was water from the tailings piles that began in 1956 when the mill opened and ended in 1966 when the mill closed. 800,000 tons (725,000 tonnes) of uranium ore were processed onsite over a 10-year period. The wet tailings remaining after processing were placed as a slurry in three piles at the site. Water from these tailings then seeped into the ground and migrated downward to the ground water. The Tuba City site is currently in a post-stabilization, prelicensing status. The site is expected to remain in this status until licensed by the U.S. Nuclear Regulatory Commission (NRC) for long-term surveillance and maintenance. The preliminary ground water compliance strategy at the Tuba City site is active remediation-specific technology to be evaluated is in situ bioremediation. This selection was made because of the potential ability of bioremediation to reduce concentrations to lower levels than a conventional extraction system and to minimize disturbance of the water resource

  19. New Evidence for the Expansion of an Upper Pleistocene Population out of East Africa, from the Site of Station One, Northern Sudan

    OpenAIRE

    Rose, Jeffrey I.

    2004-01-01

    Evidence for a hunter-gatherer range-expansion is indicated by the site of Station One in the northern Sudan, a surface scatter of chipped stone debris systematically collected almost 40 years ago, though not studied until present. Based on technological and typological correlates in East Africa, the predominant use of quartz pebbles for raw material, and the production of small bifacial tools, the site can be classified as Middle Stone Age. While often appearing in East African assemblages, ...

  20. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    International Nuclear Information System (INIS)

    Ferguson Jones, Andrea; Lee, Angela; Palmeter, Tim

    2013-01-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

  1. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    Energy Technology Data Exchange (ETDEWEB)

    Ferguson Jones, Andrea; Lee, Angela [MMM Group Limited, 100 Commerce Valley Drive West, Thornhill, Ontario, L3T 0A1 (Canada); Palmeter, Tim [Public Works and Government Services Canada, 4900 Yonge Street, Toronto, Ontario, M2N 6A6 (Canada)

    2013-07-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

  2. Risk impact of planned maintenance configuration at South Texas Project Electric Generating Station

    International Nuclear Information System (INIS)

    Loh, W.T.; Fleming, K.N.; Grantom, C.R.

    2004-01-01

    This paper is based on a study done for the Houston Lighting and Power Company. The purpose of this study is to estimate the risk impact of planned maintenance configurations at South Texas Project Electric Generating Station (STPEGS). To date, the focus of the STP probabilistic safety assessment (PSA) program has been to analyze risk in terms of estimates of accident frequencies that are expressed on a time-averaged basis. Thus, estimates of quantities such as severe core damage frequency have been made such that the temporal variations of this frequency with changing plant configurations are averaged out over time. The only condition that has been imposed on these estimates is that the plant is initially operating at full power when potential initiating events might occur. (author)

  3. Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Eugene S. Grecheck

    2010-11-30

    This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

  4. Preliminary site characterization radiological monitoring plan for the Nevada Nuclear Waste Storage Investigations Project, Yucca Mountain Site

    International Nuclear Information System (INIS)

    1987-03-01

    The activities described in this plan occur in the early phases of site characterization. This document presents the Preliminary Site Characterization Radiological Monitoring Plan (PSCRMP) for collecting and evaluating data in support of the NNWSI Project. The PSCRMP defines and identifies control procedures for the monitoring activities. The PSCRMP activity will utilize integrating radon monitoring devices, a continuous radon monitor, and a particulate air sampler. These instruments will be used to establish the baseline radioactivity and/or radioactivity released due to early site characterization activities. The sections that follow provide a general project description, the specifics of the monitoring program, and the practices that will be employed to ensure the validity of the collected data by integrating quality assurance into all activities. Section 2 of this document describes the regulatory base of this document. Section 3 describes the site characterization activities which may lead to release of radioactivity. Section 4 provides a description of the potential sources of radioactivity that site characterization could generate. Section 5 summarizes the sampling and monitoring methodology, which will be used to monitor the potential sources of radioactivity. The network of sampling and monitoring equipment is described in Section 6, and Section 7 summarizes the systems operation activities. The data reporting activities are described in Section 8. Finally, a description of the Quality Assurance (QA) and Quality Control (QC) activities is provided in Section 9. Appendix A contains a summary of the procedures to be used in this program, and Appendix B contains technical specification on equipment and services. 20 refs., 11 figs., 2 tabs

  5. Site environmental report for the Yucca Mountain Project. Calendar Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2006-10-01

    This site environmental report describes the environmental program conducted during 2005 by the U.S. Department of Energy, Office of Repository Development. The report describes the environmental laws and regulations that were applicable to the Yucca Mountain Project in 2005, the actions taken to comply with those laws and regulations, and the Project’s environmental program. The report also summarizes the data collected to monitor potential impacts of the Project on the environment.

  6. Site preparation works for No.3 plant in Ikata Nuclear Power Station, Shikoku Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Ishihara, Hisashi; Nakajima, Hiroshi; Oshima, Teruhiko

    1986-01-01

    Ikata Power Station is only nuclear power station in Shikoku located at the root of Sadamisaki Peninsula. No.1 plant started the operation in September, 1977, and No.2 plant started the operation in March, 1982. By constructing No.3 plant of 890 MWe output, the total power output will be 2.022 million kW. No.3 plant is installed adjacently to No.1 and No.2 plants on their east side. In this place, the existing facilities of the harbor and others can be effectively utilized, the nature of ground is solid, and the fundamental condition of location is perfect, it is easy to obtain the cooperation of local people as No.1 and No.2 plants have been in operation, and it is advantageous in view of the construction period for the power supply plan. The site preparation works have progressed smoothly since the start in June, 1985. About 100,000 m 2 of the site is created by cutting natural ground, and about 54,000 m 2 is created by sea reclamation. About 5 million m 3 of earth and stone generated by cutting and excavation are utilized for reclamation, revetment and others. The topographic and geological features, sea condition, the outline of geological survey, the layout, and the construction works of revetment, cutting, the creation of substitute seaweed farm, appurtenant works, and the measures for environment preservation are described. (Kako, I.)

  7. Modelling a reliable wind/PV/storage power system for remote radio base station sites without utility power

    Energy Technology Data Exchange (ETDEWEB)

    Bitterlin, Ian F [Emerson Network Power Ltd., Globe Park, Marlow, SL7 1YG (United Kingdom)

    2006-11-22

    The development of photovoltaic (PV) cells has made steady progress from the early days, when only the USA space program could afford to deploy them, to now, seeing them applied to roadside applications even in our Northern European climes. The manufacturing cost per watt has fallen and the daylight-to-power conversion efficiency increased. At the same time, the perception that the sun has to be directly shining on it for a PV array to work has faded. On some of those roadside applications, particularly for remote emergency telephones or for temporary roadwork signage where a utility electrical power connection is not practical, the keen observer will spot, usually in addition to a PV array, a small wind-turbine and an electrical cabinet quite obviously (by virtue of its volume) containing a storage battery. In the UK, we have the lions share (>40%) of Europe's entire wind power resource although, despite press coverage of the 'anti-wind' lobby to the contrary, we have hardly started to harvest this clean and free energy source. Taking this (established and proven) roadside solution one step further, we will consider higher power applications. A cellular phone system is one where a multitude of remote radio base stations (RBS) are required to provide geographical coverage. With networks developing into the so called '3G' technologies the need for base stations has tripled, as each 3G cell covers only 1/3 the geographical area of its '2G' counterpart. To cover >90% of the UK's topology (>97% population coverage) with 3G cellular technology will requires in excess of 12,000 radio base stations per operator network. In 2001, there were around 25,000 established sites and, with an anticipated degree of collocation by necessity, that figure is forecast to rise to >47,000. Of course, the vast majority of these sites have a convenient grid connection. However, it is easy to see that the combination of wind and PV power generation and an energy storage system may be an

  8. Risk management of the North Anna Power Station Service Water System Preservation Project using the IPE model

    International Nuclear Information System (INIS)

    Afzali, A.; Donovan, M.D.; Sartain, M.D.; Bankley, A.V.

    1993-01-01

    This paper discusses the application of the North Anna Power Station Individual Plant Examination (IPE) models in PRA study of the Service Water System Preservation Project (SWSPP). The service water project involves repair and restoration of the Service Water System (SWS) piping and will require excavation of the buried SWS lines in addition to temporarily removing one of the two redundant SWS loops from operation. The SWSPP will be carried out with one or both units in normal operation. The objective of the PRA study was to quantify the risk impact (as measured by the change in Core Damage Frequency (ΔCDF)) of the SWSPP and to identify and evaluate countermeasures to reduce the risk impact of the project activities. The study concluded that the ΔCDF would be acceptable by undertaking preventative measures and by providing additional accident mitigating measures during performance of the SWSPP activities

  9. Photochemical Assessment Monitoring Stations (PAMS)

    Data.gov (United States)

    U.S. Environmental Protection Agency — Photochemical Assessment Monitoring Stations (PAMS). This file provides information on the numbers and distribution (latitude/longitude) of air monitoring sites...

  10. Continuous, environmental radon monitoring program at the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Liu, N.; Sorensen, C.D.; Tung, C.H.; Orchard, C.R.

    1995-01-01

    A continuous, environmental radon monitoring program has been established in support of the Department of Energy's (DOE) Yucca Mountain Site Characterization Project (YMP). The monitoring program is to characterize the natural radon emissions at the YMP site, to understand the existing radon concentrations in the environmental background, and to assess and control the potential work exposure. Based upon a study of the monitoring results, this paper presents a preliminary understanding of the magnitudes, characteristics, and exposure levels of radon at the YMP site

  11. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Henderson, B.

    1982-11-01

    Architectural concepts and design proposals associated with the proposed Sizewell B power station are outlined. The figures are in a separate volume. They consist of the site layout plan, an axonometric drawing of the site, an elevations drawing and a colour perspective drawing of 'A', 'B' and 'C' stations. (U.K.)

  12. DECISION SUPPORT CONCEPT TO MANAGEMENT OF CONSTRUCTION PROJECTS - PROBLEM OF CONSTRUCTION SITE SELECTION

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2013-02-01

    Full Text Available The aim of this paper is to present Decision Support Concept (DSC for management of construction projects. Focus of our research is in application of multicritera methods (MCM to decision making in planning phase of construction projects (related to the problem of construction sites selection. The problem is identified as a significant one from many different aspects such as economic aspect, civil engineering aspect, etc. what indicates the necessity for evaluation of multiple sites by several different criteria. Therefore, DSC for construction site selection based on PROMETHEE method is designed. In order to define the appropriate criteria, their weights and preference functions for the concept, three groups of stakeholders are involved (investors, construction experts and experts for real estate market in its design. AHP method has been used for determination of criteria weights. The model has been tested on the problem of site selection for construction of residential-commercial building in four largest cities in Croatia.

  13. Missouri Department of Natural Resources Hazardous Waste Program Weldon Spring site remedial action project. Status of project to date January 1997

    International Nuclear Information System (INIS)

    1998-01-01

    This document describes the progress made by the Missouri Department of Natural Resources (MDNR) during the fourth year (1996) of the Agreement in Support (AIS) in its oversight role of the Weldon Springs Site Remedial Action Project (WSSRAP). The fourth year at the Weldon Springs Site shows sustained progress as the project moves through the final design and into the remedial action phases of the Chemical Plant Operable Unit. The remedial action phase includes the Foundations Removal work package, Chemical Solidification and Stabilization, and disposal cell

  14. Analysis of Fast Charging Station Network for Electrified Ride-Hailing Services

    Energy Technology Data Exchange (ETDEWEB)

    Wood, Eric W [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Rames, Clement L [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Kontou, Eleftheria [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Motoaki, Yutaka [Idaho National Laboratory; Smart, John [Idaho National Laboratory; Zhou, Zhi [Argonne National Laboratory

    2018-04-03

    Today's electric vehicle (EV) owners charge their vehicles mostly at home and seldom use public direct current fast charger (DCFCs), reducing the need for a large deployment of DCFCs for private EV owners. However, due to the emerging interest among transportation network companies to operate EVs in their fleet, there is great potential for DCFCs to be highly utilized and become economically feasible in the future. This paper describes a heuristic algorithm to emulate operation of EVs within a hypothetical transportation network company fleet using a large global positioning system data set from Columbus, Ohio. DCFC requirements supporting operation of EVs are estimated using the Electric Vehicle Infrastructure Projection tool. Operation and installation costs were estimated using real-world data to assess the economic feasibility of the recommended fast charging stations. Results suggest that the hypothetical transportation network company fleet increases daily vehicle miles traveled per EV with less overall down time, resulting in increased demand for DCFC. Sites with overhead service lines are recommended for hosting DCFC stations to minimize the need for trenching underground service lines. A negative relationship was found between cost per unit of energy and fast charging utilization, underscoring the importance of prioritizing utilization over installation costs when siting DCFC stations. Although this preliminary analysis of the impacts of new mobility paradigms on alternative fueling infrastructure requirements has produced several key results, the complexity of the problem warrants further investigation.

  15. WSSRAP chemical plant geotechnical investigations for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1990-12-01

    This document has been prepared for the United states Department of Energy (DOE) Weldon Spring Site Remedial Action Project (WSSRAP) by the Project Management Contractor (PMC), which consists of MK-Ferguson Company (MKF) and Morrison Knudsen Corporation Environmental Services Group (MKES) with Jacobs Engineering Group (JEG) as MKF's predesignated subcontractor. This report presents the results of site geotechnical investigations conducted by the PMC in the vicinity of the Weldon Spring chemical plant and raffinate pits (WSCP/RP) and in potential on-site and off-site clayey material borrow sources. The WSCP/RP is the proposed disposal cell (DC) site. 39 refs., 24 figs., 12 tabs

  16. DECHEM: A remedial planning tool for metallic contaminants in soil at UMTRA Project sites

    International Nuclear Information System (INIS)

    1989-03-01

    The DECHEM (DEcontamination of CHEMicals) method was developed for the Uranium Mill Tailings Remedial Action (UMTRA) Project to guide characterization and remedial planning for metals contamination in soils. This is necessary because non-radiological hazardous constituents may be more mobile than radium-226 (Ra-226), and hence may migrate more deeply into subpile soils (beneath tailings that are to be relocated) or into adjacent contaminated soils at UMTRA Project sites. The result is that remedial action to the Ra-226 excavation limit, as specified in the US Environmental Protection Agency (EPA) standards, may not adequately remove hazardous non-radiological contamination. Unmitigated, these contaminants in soil may cause health risks because of their presence in resuspended particles, their uptake by crops or fodder their seepage into aquifers used for drinking water or other possible exposure pathways. The DECHEM method was developed in response to the need for advanced planning for the remediation of chemical contaminants at UMTRA Project sites, and includes the following elements: Establishment of acceptable exposure rates for humans to chemicals, based on EPA guidelines or other toxicological literature. Modeling of chemical migration through environmental pathways from a remediated UMTRA Project site to humans. Determination of allowable residual concentrations (i.e., cleanup guidelines) for chemicals in soils that results in doses to humans that are below established acceptable exposure rates. The initial development and application of the DECHEM method has focused upon hazardous metallic contaminants such as arsenic, lead, molybdenum, and selenium, which are known to occur in elevated concentrations at some UMTRA Project sites

  17. The ANSS Station Information System: A Centralized Station Metadata Repository for Populating, Managing and Distributing Seismic Station Metadata

    Science.gov (United States)

    Thomas, V. I.; Yu, E.; Acharya, P.; Jaramillo, J.; Chowdhury, F.

    2015-12-01

    Maintaining and archiving accurate site metadata is critical for seismic network operations. The Advanced National Seismic System (ANSS) Station Information System (SIS) is a repository of seismic network field equipment, equipment response, and other site information. Currently, there are 187 different sensor models and 114 data-logger models in SIS. SIS has a web-based user interface that allows network operators to enter information about seismic equipment and assign response parameters to it. It allows users to log entries for sites, equipment, and data streams. Users can also track when equipment is installed, updated, and/or removed from sites. When seismic equipment configurations change for a site, SIS computes the overall gain of a data channel by combining the response parameters of the underlying hardware components. Users can then distribute this metadata in standardized formats such as FDSN StationXML or dataless SEED. One powerful advantage of SIS is that existing data in the repository can be leveraged: e.g., new instruments can be assigned response parameters from the Incorporated Research Institutions for Seismology (IRIS) Nominal Response Library (NRL), or from a similar instrument already in the inventory, thereby reducing the amount of time needed to determine parameters when new equipment (or models) are introduced into a network. SIS is also useful for managing field equipment that does not produce seismic data (eg power systems, telemetry devices or GPS receivers) and gives the network operator a comprehensive view of site field work. SIS allows users to generate field logs to document activities and inventory at sites. Thus, operators can also use SIS reporting capabilities to improve planning and maintenance of the network. Queries such as how many sensors of a certain model are installed or what pieces of equipment have active problem reports are just a few examples of the type of information that is available to SIS users.

  18. Controlling engineering project changes for multi-unit, multi-site standardized nuclear power plants

    International Nuclear Information System (INIS)

    Randall, E.; Boddeker, G.; McGugin, H.; Strother, E.; Waggoner, G.

    1978-01-01

    Multibillioin dollar multiple nuclear power plant projects have numerous potential sources of engineering changes. The majority of these are internally generated changes, client generated changes, and changes from construction, procurement, other engineering organizations, and regulatory organizations. For multiunit, multisite projects, the use of a standardized design is cost effective. Engineering changes can then be controlled for a single standardized design, and the unit or site unique changes can be treated as deviations. Once an effective change procedure is established for change control of the standardized design, the same procedures can be used for control of unit or site unique changes

  19. Vacuum recovery of free phased leaded gasoline plume Naval Air Station Oceana, Virginia Beach, Virginia

    International Nuclear Information System (INIS)

    Conway, J.D.; DeLattre, E.L.S.; Beatty, T.R.

    1999-01-01

    Much attention has been paid to the remediation and site restoration of contaminated sites resulting from gasoline and diesel underground storage tanks. These sites are generally associated with fuel delivery systems and are readily visible to the public. One such site is located within the Naval Air Station (NAS) Oceana, Virginia Beach, Virginia. The remediation site is located on an active gas station within NAS Oceana. The scope of the project was to construct a dual-phase remediation system for the removal of free product and the treatment of contaminated groundwater. Contaminated groundwater was to have been collected form recovery wells and conveyed via an underground conveyance system to the treatment system. The treatment system would have contained all the necessary equipment to extract groundwater from the subsurface. The estimated effluent limit for lead would necessitate removal of lead with associated modifications to the treatment system design. Such modifications were financially unfeasible; thus, an alternative remediation scheme had to be designed. LANTDIV decided on a remediation scheme that involved product-only recovery via solar-powered product skimmers and free product removal through vapor extraction. The estimated volume of product in the ground prior to starting the system was 18,000 gallons. The volume of product in the ground after one year of operation is estimated to be 11,700 gallons, reducing the total volume by one-third in the first year of operation. Project thickness that was originally measured at >1.0 foot in six monitoring wells in October 1997 is now present in only three wells at a thickness >0.5 feet. This remediation was accomplished using a treatment system that required minimal capital cost and is simple to operate, thereby keeping operation and maintenance (O and M) cost to a minimum

  20. Study of atmospheric stagnation, recirculation, and ventilation potential at Narora Atomic Power Station site

    International Nuclear Information System (INIS)

    Kumar, Deepak; Kumar, Avinash; Kumar, Vimal; Rao, K.S.; Kumar, Jaivender; Ravi, P.M.

    2011-01-01

    Atmosphere is an important pathway to be considered in assessment of the environmental impact of radioactivity releases from nuclear facilities. Estimation of concentration of released effluents in air and possible ground contamination needs an understanding of relevant atmospheric dispersion. This article describes the meteorological characteristics of Narora Atomic Power Station (NAPS) site by using the integral parameters developed by Allwine and Whiteman. Meteorological data measured during the period 2006-2010 were analyzed. The integral quantities related to the occurrence of stagnation, recirculation, and ventilation characteristics were studied for NAPS site to assess the dilution potential of the atmosphere. Wind run and recirculation factors were calculated for a 24-h transport time using 5 years of hourly surface measurements of wind speed and direction. The occurrence of stagnation, recirculation, and ventilation characteristics during 2006-2010 at NAPS site is observed to be 33.8% of the time, 19.5% of the time, and 34.7% of the time, respectively. The presence of strong winds with predominant wind direction NW and WNW during winter and summer seasons leads to higher ventilation (48.1% and 44.3%) and recirculation (32.6% of the summer season). The presence of light winds and more dispersed winds during prewinter season with predominant wind directions W and WNW results in more stagnation (59.7% of the prewinter season). Thus, this study will serve as an essential meteorological tool to understand the transport mechanism of atmospheric radioactive effluent releases from any nuclear industry. (author)

  1. Preliminary study on the reactivation of the WERAP small hydro power station in Bubikon

    International Nuclear Information System (INIS)

    Bretscher, A.; Gutzwiller, S.

    2003-01-01

    This study on the revitalisation of a small hydro power station belonging to old spinning mill in Bubikon, Switzerland, proposes ideas for the reactivation of an old hydropower installation that once helped power a spinning mill. Details are given on the history of the mill and the hydrological conditions to be expected at the site. Three variants are proposed for the refurbishment, including the revision of the power station's existing 44 kW Francis turbine dating from 1908, the addition of further, similar Francis turbine or its replacement with a new 61 kW Francis turbine. The costs and amortisation of the refurbishment variants are examined, the revenues that can be expected from its operation and other financial factors are discussed. Further, environmental and legal aspects of the project are examined and suggestions are made for the next steps to be taken towards the realisation of this small hydropower plant. An annex provides photographs of the location and the power station's equipment

  2. Inauguration of the ANDRA atmospheric station in Houdelaincourt; Inauguration de la station atmospherique de l'Andra a Houdelaincourt

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    This document briefly presents the atmospheric monitoring station inaugurated in Houdelaincourt (Meuse) and installed by the ANDRA within the frame of the ICOS (Integrated Carbon Observing System) European infrastructure project which aims at developing air and greenhouse gas monitoring over Europe. It also recalls that this station is part of a set of means of monitoring, experimentation and protection of the environment within the frame of high and medium level nuclear waste storage project in Meuse and Haute-Marne. The document also proposes brief presentations of the different actors involved in the creation of this station: the LSCE (laboratory of sciences of climate and environment), Meteo-France, Air Lorraine, the IRSN, and the LGGE (laboratory of glaciology and geophysics of the environment)

  3. Lunar base thermoelectric power station study

    Science.gov (United States)

    Determan, William; Frye, Patrick; Mondt, Jack; Fleurial, Jean-Pierre; Johnson, Ken; Stapfer, G.; Brooks, Michael D.; Heshmatpour, Ben

    2006-01-01

    Under NASA's Project Prometheus, the Nuclear Systems Program, the Jet Propulsion Laboratory, Pratt & Whitney Rocketdyne, and Teledyne Energy Systems have teamed with a number of universities, under the Segmented Thermoelectric Multicouple Converter (STMC) program, to develop the next generation of advanced thermoelectric converters for space reactor power systems. Work on the STMC converter assembly has progressed to the point where the lower temperature stage of the segmented multicouple converter assembly is ready for laboratory testing and the upper stage materials have been identified and their properties are being characterized. One aspect of the program involves mission application studies to help define the potential benefits from the use of these STMC technologies for designated NASA missions such as the lunar base power station where kilowatts of power are required to maintain a permanent manned presence on the surface of the moon. A modular 50 kWe thermoelectric power station concept was developed to address a specific set of requirements developed for this mission. Previous lunar lander concepts had proposed the use of lunar regolith as in-situ radiation shielding material for a reactor power station with a one kilometer exclusion zone radius to minimize astronaut radiation dose rate levels. In the present concept, we will examine the benefits and requirements for a hermetically-sealed reactor thermoelectric power station module suspended within a man-made lunar surface cavity. The concept appears to maximize the shielding capabilities of the lunar regolith while minimizing its handling requirements. Both thermal and nuclear radiation levels from operation of the station, at its 100-m exclusion zone radius, were evaluated and found to be acceptable. Site preparation activities are reviewed and well as transport issues for this concept. The goal of the study was to review the entire life cycle of the unit to assess its technical problems and technology

  4. West Valley Demonstration Project site environmental report calendar year 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1998 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  5. West Valley Demonstration Project site environmental report, calendar year 1999

    Energy Technology Data Exchange (ETDEWEB)

    None Available

    2000-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1999 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  6. West Valley Demonstration Project site environmental report, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1997 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  7. Final Hanford Site Transuranic (TRU) Waste Characterization Qualit Assurance Project Plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    1999-01-01

    The Transuranic Waste Characterization Quality Assurance Program Plan required each U.S. Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the quality assurance project plan (QAPP)

  8. Basalt Waste Isolation Project exploratory shaft site: Final reclamation report

    International Nuclear Information System (INIS)

    Brandt, C.A.; Rickard, W.H. Jr.

    1990-06-01

    The restoration of areas disturbed by activities of the Basalt Waste Isolation Project (BWIP) constitutes a unique operation at the US Department of Energy's (DOE) Hanford Site, both from the standpoint of restoration objectives and the time frame for accomplishing these objectives. The BWIP reclamation program comprises three separate projects: borehole reclamation, Near Surface Test Facility (NSTF) reclamation, and Exploratory Shaft Facility (ESF) reclamation. The main focus of this report is on determining the success of the revegetation effort 1 year after work was completed. This report also provides a brief overview of the ESF reclamation program. 21 refs., 7 figs., 14 tabs

  9. The Heysham 2 and Torness nuclear power station projects

    International Nuclear Information System (INIS)

    Cameron, P.J.

    1989-01-01

    At the beginning of the design of the Heysham 2 and Torness Nuclear Power Stations in the UK, it was agreed that the Hinkley Point B/Hunterston B Advanced Gas Cooled reactor design would be repeated. However, the Hinkley Point B/Hunterston B designs dated from 1964, and inevitably safety requirements had escalated in the intervening years. Furthermore, operating experience gained from Hinkley Point B/Hunterston B showed that it was desirable to make changes to particular features. Design changes were therefore included where it was considered essential to improve performance, to improve safety and to improve engineering. The resulting station designs are described. (author)

  10. Seasonal variation of atmospheric particle number concentrations, new particle formation and atmospheric oxidation capacity at the high Arctic site Villum Research Station, Station Nord

    Directory of Open Access Journals (Sweden)

    Q. T. Nguyen

    2016-09-01

    Full Text Available This work presents an analysis of the physical properties of sub-micrometer aerosol particles measured at the high Arctic site Villum Research Station, Station Nord (VRS, northeast Greenland, between July 2010 and February 2013. The study focuses on particle number concentrations, particle number size distributions and the occurrence of new particle formation (NPF events and their seasonality in the high Arctic, where observations and characterization of such aerosol particle properties and corresponding events are rare and understanding of related processes is lacking.A clear accumulation mode was observed during the darker months from October until mid-May, which became considerably more pronounced during the prominent Arctic haze months from March to mid-May. In contrast, nucleation- and Aitken-mode particles were predominantly observed during the summer months. Analysis of wind direction and wind speed indicated possible contributions of marine sources from the easterly side of the station to the observed summertime particle number concentrations, while southwesterly to westerly winds dominated during the darker months. NPF events lasting from hours to days were mostly observed from June until August, with fewer events observed during the months with less sunlight, i.e., March, April, September and October. The results tend to indicate that ozone (O3 might be weakly anti-correlated with particle number concentrations of the nucleation-mode range (10–30 nm in almost half of the NPF events, while no positive correlation was observed. Calculations of air mass back trajectories using the Hybrid Single Particle Lagrangian Integrated Trajectory (HYSPLIT model for the NPF event days suggested that the onset or interruption of events could possibly be explained by changes in air mass origin. A map of event occurrence probability was computed, indicating that southerly air masses from over the Greenland Sea were more likely linked to those

  11. Safety analysis and hazard classification for the 100-B/C Site Remediation Project, Phase 1. Revision 1

    International Nuclear Information System (INIS)

    Adam, W.J.; Lehrschall, R.R.; Oestreich, D.K.

    1996-07-01

    The purpose of this report is to document the preliminary hazard classification (PHC) for the initial group of sites to be remediated by the 100-B/C Site Remediation Project. The project is targeted at excavation of contaminated solid from seven waste sites, and the transportation and disposal of these wastes at the Environmental Restoration Disposal Facility. The PHC for these remediation activities is rated as radiological

  12. Yucca Mountain Site Characterization Project: Technical data catalog,(quarterly supplement)

    International Nuclear Information System (INIS)

    1993-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year

  13. Application of ground-penetrating radar at McMurdo Station, Antarctica

    Energy Technology Data Exchange (ETDEWEB)

    Stefano, J.E.

    1992-01-01

    Argonne National Laboratory initiated a site investigation program at McMurdo Station, Antarctica, to characterize environmental contamination. The performance and usefulness of ground-penetrating radar (GPR) was evaluated under antarctic conditions during the initial site investigation in January 1991. Preliminary surveys were successful in defining the contact between reworked pyroclastic material and in the prefill, undisturbed pyroclastics and basalts at some sites. Interference from radio traffic at McMurdo Station was not observed, but interference was a problem in work with unshielded antennas near buildings. In general, the results of this field test suggest that high-quality, high-resolution, continuous subsurface profiles can be produced with GPR over most of McMurdo Station.

  14. Application of ground-penetrating radar at McMurdo Station, Antarctica

    Energy Technology Data Exchange (ETDEWEB)

    Stefano, J.E.

    1992-05-01

    Argonne National Laboratory initiated a site investigation program at McMurdo Station, Antarctica, to characterize environmental contamination. The performance and usefulness of ground-penetrating radar (GPR) was evaluated under antarctic conditions during the initial site investigation in January 1991. Preliminary surveys were successful in defining the contact between reworked pyroclastic material and in the prefill, undisturbed pyroclastics and basalts at some sites. Interference from radio traffic at McMurdo Station was not observed, but interference was a problem in work with unshielded antennas near buildings. In general, the results of this field test suggest that high-quality, high-resolution, continuous subsurface profiles can be produced with GPR over most of McMurdo Station.

  15. Application of ground-penetrating radar at McMurdo Station, Antarctica

    International Nuclear Information System (INIS)

    Stefano, J.E.

    1992-01-01

    Argonne National Laboratory initiated a site investigation program at McMurdo Station, Antarctica, to characterize environmental contamination. The performance and usefulness of ground-penetrating radar (GPR) was evaluated under antarctic conditions during the initial site investigation in January 1991. Preliminary surveys were successful in defining the contact between reworked pyroclastic material and in the prefill, undisturbed pyroclastics and basalts at some sites. Interference from radio traffic at McMurdo Station was not observed, but interference was a problem in work with unshielded antennas near buildings. In general, the results of this field test suggest that high-quality, high-resolution, continuous subsurface profiles can be produced with GPR over most of McMurdo Station

  16. Assessment of the Nevada Test Site as a Site for Distributed Resource Testing and Project Plan: March 2002

    Energy Technology Data Exchange (ETDEWEB)

    Horgan, S.; Iannucci, J.; Whitaker, C.; Cibulka, L.; Erdman, W.

    2002-05-01

    The objective of this project was to evaluate the Nevada Test Site (NTS) as a location for performing dedicated, in-depth testing of distributed resources (DR) integrated with the electric distribution system. In this large scale testing, it is desired to operate multiple DRs and loads in an actual operating environment, in a series of controlled tests to concentrate on issues of interest to the DR community. This report includes an inventory of existing facilities at NTS, an assessment of site attributes in relation to DR testing requirements, and an evaluation of the feasibility and cost of upgrades to the site that would make it a fully qualified DR testing facility.

  17. Decommissioning project readiness reviews at the Department of Energy's Hanford, Washington, Site

    International Nuclear Information System (INIS)

    Speer, D.R.; Holmes, P.A.

    1987-01-01

    Two Hanford Site contractors independently formulated readiness review methods to prepare for decontamination and decommissioning (D and D) projects. One readiness review method provided an independent management review process. The other method provided a review by personnel directly involved in the project and concise documentation procedures. A unified system is now used at Hanford which combines the best aspects of both readiness review methods. The unified method assigns category levels based on certain job characteristics. The category assigned to the project then indicates the required level of management review prior to proceeding with the D and D project. In addition, the concise documentation procedures are now used for all category levels

  18. Switchgear project meticulously managed.

    Science.gov (United States)

    Baillie, Jonathan

    2015-04-01

    Electrical engineering and estates personnel at Sodexo--which manages a wide range of soft and hard facilities management services for five hospitals under a PFI contract at the Manchester Royal Infirmary--have successfully planned, managed, and co-ordinated, a complex electrical engineering project which saw high voltage (HV) switchgear in the site's main intake sub-station dismantled by the supplier to repair a potential earthing mechanism fault which would have prevented individual switchgear panels being shut down, to, for example, cater for renovation of electrical cabling or components cross the site's high voltage network. With detailed planning, including provision for bringing onto site temporary bulk generators, and the formulation of a 600-step switching programme, the replacement of potential faulty driver components in the disconnect mechanism for 20 HV switchgear panels was completed in just four weeks, with minimal interruption to the vast complex's power supply.

  19. Mojave Base Station Implementation

    Science.gov (United States)

    Koscielski, C. G.

    1984-01-01

    A 12.2 meter diameter X-Y mount antenna was reconditioned for use by the crustal dynamic project as a fixed base station. System capabilities and characteristics and key performance parameters for subsystems are presented. The implementation is completed.

  20. AECB staff annual assessment of the Bruce A Nuclear Generating Station for the year 1995

    International Nuclear Information System (INIS)

    1996-06-01

    The Atomic Energy Control Board conducts a staff assessment of safety at Bruce Nuclear Generating Station A for 1995. On-site Project Officers and Ottawa based specialists monitored the station throughout the year. Ontario Hydro operated Bruce A safely in 1995, maintaining the risk to workers and the public at an acceptably low level. Radiation doses to workers and releases to the environment were well below regulatory limits. However, Ontario Hydro must improve contamination control at Bruce A. Special safety system performance a Bruce A was less than adequate. The negative pressure containment system and units 4's shutdown system two exceeded unavailability targets in 1995. However, we are satisfied Ontario Hydro is taking appropriate action to correct this. 5 tabs., 5 figs

  1. Mitigation and monitoring plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado

    International Nuclear Information System (INIS)

    1992-06-01

    The U.S Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project. The UMTRA Project is the result of the Uranium Mill Tailings Radiation Control Act(UMTRA) which was passed in response to the public's concern over the potential public health hazards related to uranium mill tailings and associated contaminated material at abandoned or otherwise uncontrolled inactive processing sites throughout the United States. The Gunnison, Colorado abandoned uranium mill site is one of the sites slated for cleanup by the DOE under authority of UMTRA. The contaminated material at this site will be transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities will temporarily disturb 0.8 acre and permanently eliminate 5.1 acres of wetlands. This report describes the proposed mitigation plan for the 5.9 acres of impacted wetlands. In conjunction with the mitigation of the permanently impacted wetlands through the enhancement of wetland and adjacent riparian areas, impacts to wildlife as a result of this project will also be mitigated. However, wildlife mitigation is not the focus of this document and is covered in relevant BLM permits for this project. This plan proposes the enhancement of a 3:1 ratio of impacted wetlands in accordance with US Environmental Protection Agency guidelines, plus the enhancement of riparian areas for wildlife mitigation. Included in this mitigation plan is a monitoring plan to ensure that the proposed measures are working and being maintained

  2. The siting of nuclear power stations in Britain

    International Nuclear Information System (INIS)

    Wright, H.A.

    1975-01-01

    It is a fundamental precept that all prudent precautions should be taken. The secondary contribution to public safety derived by a proper choice of site must therefore be utilised. A siting policy should limit the choice of site but give the Utility sufficient freedom of choice to enable the more remote sites to be available for the adoption of new reactor types. For a significant release few people should be affected sufficiently to require evacuation, and account must also be taken of population centres possibly up to 20 miles from the site. (orig.) [de

  3. The DYFAMED time-series station: A reference site for environmental studies in the North Western Mediterranean Sea

    International Nuclear Information System (INIS)

    Marty, J.C.; Vescovali, I.; Oubelkheir, K.; Stock, A.; Chiaverini, J.; Pizay, M.D.

    1999-01-01

    The observation site is located in the central part of the Ligurian sea, at about 50 km off Nice, on the Nice Corsica transect. The Ligurian sea is characterised by three different areas. The coastal area is submitted to inputs from coast and from the liguro-provencal current. The frontal zone is delimited by the ligurian current and the central area. This frontal zone isolates the central part of the basin where is located the DYFAMED site. In this central area, the primary production is dependent on inputs of nutrients from deeper waters but also, for a badly evaluated part, on atmospheric inputs of nitrogen and some trace metals particularly during summer. Since 1987, data have been collected on the time series station, in the frame of the Jgofs-France program. Then, the scientific observation service has been officially created by INSU/CNRS in 1995

  4. NASA space station automation: AI-based technology review

    Science.gov (United States)

    Firschein, O.; Georgeff, M. P.; Park, W.; Neumann, P.; Kautz, W. H.; Levitt, K. N.; Rom, R. J.; Poggio, A. A.

    1985-01-01

    Research and Development projects in automation for the Space Station are discussed. Artificial Intelligence (AI) based automation technologies are planned to enhance crew safety through reduced need for EVA, increase crew productivity through the reduction of routine operations, increase space station autonomy, and augment space station capability through the use of teleoperation and robotics. AI technology will also be developed for the servicing of satellites at the Space Station, system monitoring and diagnosis, space manufacturing, and the assembly of large space structures.

  5. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1995 quality program status report

    Energy Technology Data Exchange (ETDEWEB)

    Bolivar, S.L.

    1996-07-01

    This status report summarizes the activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project`s (YMP`s) quality assurance program for January 1 to September 30, 1995. The report includes major sections on program activities and trend analysis.

  6. UMTRA project water sampling and analysis plan -- Shiprock, New Mexico

    International Nuclear Information System (INIS)

    1994-02-01

    Water sampling and analysis plan (WSAP) is required for each U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site to provide a basis for ground water and surface water sampling at disposal and former processing sites. This WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the monitoring stations at the Navaho Reservation in Shiprock, New Mexico, UMTRA Project site. The purposes of the water sampling at Shiprock for fiscal year (FY) 1994 are to (1) collect water quality data at new monitoring locations in order to build a defensible statistical data base, (2) monitor plume movement on the terrace and floodplain, and (3) monitor the impact of alluvial ground water discharge into the San Juan River. The third activity is important because the community of Shiprock withdraws water from the San Juan River directly across from the contaminated alluvial floodplain below the abandoned uranium mill tailings processing site

  7. U.S. Department of Energy Grand Junction Projects Office site environmental report for calendar year 1995

    International Nuclear Information System (INIS)

    1996-05-01

    This report presents information pertaining to environmental activities conducted during calendar year 1995 at the US Department of Energy (DOE) Grand Junction Projects Office (GJPO) facility in Grand Junction, Colorado. Environmental activities conducted at the GJPO facility during 1995 were associated with mixed-waste treatment, site remediation, off-site dose modeling, and radiological and nonradiological monitoring. As part of the GJPO Mixed-Waste Treatment Program, on-site treatability studies were conducted in 1995 that made use of pilot-scale evaporative-oxidation and thermal-desorption units and bench-scale stabilization. DOE-GJPO used some of its own mixed-waste as well as samples received from other DOE sites for these treatability studies. These studies are expected to conclude in 1996. Removal of radiologically contaminated materials from GJPO facility buildings was conducted under the provisions of the Grand Junction Projects Office Remedial Action Project. Remediation activities included the removal of 394 metric tons of contaminated material from Buildings 18 and 28 and revegetation activities on the GJPO site; remediation was conducted in compliance with applicable permits

  8. Enhancing Effectiveness of EMSP Projects Through Strong Connections to Site Problems

    International Nuclear Information System (INIS)

    Guillen, D. P.; Josephson, G. B.

    2002-01-01

    The Environmental Management Science Program (EMSP) funds basic science research that will lead to reduced remediation cost, schedule, technical uncertainties, and risk for DOE's environmental clean up. The Tanks Focus Area (TFA) has partnered with EMSP to accomplish those same objectives for DOE's largest and most expensive remediation effort--to retrieve and immobilize the highly radioactive wastes that are our nation's chief nuclear defense program legacy. TFA has been tasked to facilitate success of the EMSP investment. The key for EMSP projects to contribute to this remediation effort is communication. First, scientists need to understand much more about how their scientific results would be used than they could ever learn from the original EMSP solicitation or by reading the referenced DOE needs statements. Second, the scientists' results must be communicated to the site problem holders in a usable form and in a timely manner such that important information gaps can still be filled by the EMSP project. Research results can be used in a variety of ways besides deployment of new hardware or a new process. When results are USED the site problem holders become ''users''. The important aspect that research results are to be used is captured in the TFA lexicon for their clients, the DOE sites--''users''. This paper will show, through several examples, significant contributions EMSP scientists have made to solving DOE's high-level waste challenges through direct and enhanced communication with TFA and site users

  9. Tokai earthquakes and Hamaoka Nuclear Power Station

    International Nuclear Information System (INIS)

    Komura, Hiroo

    1981-01-01

    Kanto district and Shizuoka Prefecture are designated as ''Observation strengthening districts'', where the possibility of earthquake occurrence is high. Hamaoka Nuclear Power Station, Chubu Electric Power Co., Inc., is at the center of this district. Nuclear power stations are vulnerable to earthquakes, and if damages are caused by earthquakes in nuclear power plants, the most dreadful accidents may occur. The Chubu Electric Power Co. underestimates the possibility and scale of earthquakes and the estimate of damages, and has kept on talking that the rock bed of the power station site is strong, and there is not the fear of accidents. However the actual situation is totally different from this. The description about earthquakes and the rock bed in the application of the installation of No.3 plant was totally rewritten after two years safety examination, and the Ministry of International Trade and Industry approved the application in less than two weeks thereafter. The rock bed is geologically evaluated in this paper, and many doubtful points in the application are pointed out. In addition, there are eight active faults near the power station site. The aseismatic design of the Hamaoka Nuclear Power Station assumes the acceleration up to 400 gal, but it may not be enough. The Hamaoka Nuclear Power Station is intentionally neglected in the estimate of damages in Shizuoka Prefecture. (Kako, I.)

  10. Mitigation of Selected Hanford Site Manhattan Project and Cold War Era Artifacts

    International Nuclear Information System (INIS)

    Prendergast-Kennedy, Ellen L.; Harvey, David W.

    2006-01-01

    This document is the first time that Manhattan Project and Cold War era artifacts from the Hanford Site have been assembled within a publication. The publication presents photographic and written documentation of a number of Manhattan Project and Cold War era artifacts that were identified and tagged during assessment walk throughs of historic buildings on the Hanford Site but which could not be curated within the Hanford collection because they were too large for long-term storage and/or exhibit purposes or were radiologically contaminated. The significance of the artifacts in this publication and a proposed future appendix is based not on the individual significance of any single artifact but on their collective contribution to the science and engineering of creating plutonium and advancing nuclear technology in nuclear fuel and power.

  11. Mitigation of Selected Hanford Site Manhattan Project and Cold War Era Artifacts

    Energy Technology Data Exchange (ETDEWEB)

    Kennedy, Ellen P.; Harvey, David W.

    2006-09-08

    This document is the first time that Manhattan Project and Cold War era artifacts from the Hanford Site have been assembled within a publication. The publication presents photographic and written documentation of a number of Manhattan Project and Cold War era artifacts that were identified and tagged during assessment walk throughs of historic buildings on the Hanford Site but which could not be curated within the Hanford collection because they were too large for long-term storage and/or exhibit purposes or were radiologically contaminated. The significance of the artifacts in this publication and a proposed future appendix is based not on the individual significance of any single artifact but on their collective contribution to the science and engineering of creating plutonium and advancing nuclear technology in nuclear fuel and power.

  12. Experience from the construction and operation of Tarapur and Rajasthan Nuclear Power Stations

    International Nuclear Information System (INIS)

    Shah, J.C.; Pardiwala, T.F.; Kothare, V.V.; Rao, M.H.P.; Nanjundeswaran, K.

    1977-01-01

    India's experience in construction and operation of nuclear power stations so far covers two BWR and four PHWR Units in three power stations. Two more PHWR units are at an early stage of construction. The twin unit Tarapur Station (2x210 MWe BWR) was built as a turnkey project which restricted participation of Indian engineers in design and construction considerably. The contrasting approach adopted for Rajasthan Station (2x220 MWe PHWR) involved Indian personnel and contractors fully in construction and commissioning, with Canadians providing supervisory assistance in Rajasthan I and essentially consultative help for Rajasthan II. Subsequent stations are wholly Indian efforts. Tarapur went into commercial operation in 1969, 60 months after breaking of ground. Construction was essentially uneventful, major problems faced being stress corrosion induced cracks in the reactor lining and complete change of steam generator tubes. In its seven years of operations, Tarapur has faced several problems mainly arising from rather early designs, indifferent fuel performance, constraints of twin-unit approach and operations in an inadequately developed grid system apart from those generally stemming from assimilation of an advanced technology in a developing country. The Station has undergone six refuellings during this period. Most of the problems have been overcome by design changes, system augmentations and experience and the Station operation since mid 1974 have generally been steady at around 90% of the rated capacity. Construction of Rajasthan I at a remote and isolated site proceeded relatively slowly. Local availability of skilled and semi-skilled manpower was poor, affecting construction. Inadequate roads impeded movements of overdimensioned components. Observing strict Quality Assurance standards required several major rectifications at site. Rajasthan I went on line in 1973 after overcoming major turbine bearing problems during commissioning. Since then, while

  13. WEST VALLEY DEMONSTRATION PROJECT ANNUAL SITE ENVIRONMENTAL REPORT CALENDAR YEAR 2002

    International Nuclear Information System (INIS)

    2003-01-01

    This annual environmental monitoring report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2002 environmental monitoring data so as to describe the performance of the WVDP's environmental management system, confirm compliance with standards and regulations, and highlight important programs. In 2002, the West Valley Demonstration Project, the site of a DOE environmental cleanup activity operated by West Valley Nuclear Services Co. (WVNSCO), was in the final stages of stabilizing high-level radioactive waste (HLW) that remained at the site after commercial nuclear fuel reprocessing had been discontinued in the early 1970s. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority (NYSERDA). Ongoing work activities at the WVDP during 2002 included: (1) completing HLW solidification and melter shutdown; (2) shipping low-level radioactive waste off-site for disposal; (3) constructing a facility where large high-activity components can be safely packaged for disposal; (4) packaging and removing spent materials from the vitrification facility; (5) preparing environmental impact statements for future activities; (6) removing as much of the waste left behind in waste tanks 8D-1 and 8D-2 as was reasonably possible; (7) removing storage racks, canisters, and debris from the fuel receiving and storage pool, decontaminating pool walls, and beginning shipment of debris for disposal; (8) ongoing decontamination in the general purpose cell and the process mechanical cell (also referred to as the head end cells); (9) planning

  14. WEST VALLEY DEMONSTRATION PROJECT ANNUAL SITE ENVIRONMENTAL REPORT CALENDAR YEAR 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-09-12

    This annual environmental monitoring report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2002 environmental monitoring data so as to describe the performance of the WVDP's environmental management system, confirm compliance with standards and regulations, and highlight important programs. In 2002, the West Valley Demonstration Project, the site of a DOE environmental cleanup activity operated by West Valley Nuclear Services Co. (WVNSCO), was in the final stages of stabilizing high-level radioactive waste (HLW) that remained at the site after commercial nuclear fuel reprocessing had been discontinued in the early 1970s. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority (NYSERDA). Ongoing work activities at the WVDP during 2002 included: (1) completing HLW solidification and melter shutdown; (2) shipping low-level radioactive waste off-site for disposal; (3) constructing a facility where large high-activity components can be safely packaged for disposal; (4) packaging and removing spent materials from the vitrification facility; (5) preparing environmental impact statements for future activities; (6) removing as much of the waste left behind in waste tanks 8D-1 and 8D-2 as was reasonably possible; (7) removing storage racks, canisters, and debris from the fuel receiving and storage pool, decontaminating pool walls, and beginning shipment of debris for disposal; (8) ongoing decontamination in the general purpose cell and the process mechanical cell (also referred to as the head end cells); (9

  15. North Anna Power Station - Unit 1: Overview of steam generator replacement project activities

    International Nuclear Information System (INIS)

    Gettler, M.W.; Bayer, R.K.; Lippard, D.W.

    1993-01-01

    The original steam generators at Virginia Electric and Power Company's (Virginia Power) North Anna Power Station (NAPS) Unit 1 have experienced corrosion-related degradation that require periodic inspection and plugging of steam generator tubes to ensure their continued safe and reliable operation. Despite improvements in secondary water chemistry, continued tube degradation in the steam generators necessitated the removal from service of approximately 20.3 percent of the tubes by plugging, (18.6, 17.3, and 25.1 for steam generators A, B, and C, respectively). Additionally, the unit power was limited to 95 % during, its last cycle of operation. Projections of industry and Virginia Power experience indicated the possibility of mid-cycle inspections and reductions in unit power. Therefore, economic considerations led to the decision to repair the steam generators (i.e., replace the steam generator lower assemblies). Three new Model 51F Steam Generator lower assembly units were ordered from Westinghouse. Virginia Power contracted Bechtel Power Corporation to provide the engineering and construction support to repair the Unit 1 steam generators. On January 4, 1993, after an extended coastdown period, North Anna Unit 1 was brought off-line and the 110 day (breaker-to-breaker) Steam Generator Replacement Project (SGRP) outage began. As of this paper, the outage is still in progress

  16. The Savannah River Site Replacement High Level Radioactive Waste Evaporator Project

    International Nuclear Information System (INIS)

    Brock Presgrove, S.

    1992-01-01

    The Replacement High Level Waste Evaporator Project was conceived in 1985 to reduce the volume of the high level radioactive waste currently stored at the DOE Savannah River Site Tank Farm. Process of the high level waste has been accomplished up to this time using Bent Tube type evaporators and therefore, that type evaporator was selected for this project. The Title I Design of the project was 70% completed in late 1990. The Department of Energy at that time hired an independent consulting firm to perform a complete review of the project. The DOE placed a STOP ORDER on purchasing the evaporator in January 1991. Essentially, no construction was to be done on the project until all findings and concerns dealing with the type and design of the evaporator are resolved. This report addresses two aspects of the DOE design review: Comparing the Bent Tube Evaporator with the Forced Circulation Evaporator; The design portion of the DOE Project Review - concentrated on the mechanical design properties of the evaporator. (author)

  17. In Situ Thermal NAPL Remediation at the Northeast Site Pinellas Environmental Restoration Project

    International Nuclear Information System (INIS)

    Juhlin, R.; Butherus, M.

    2006-01-01

    The U.S. Department of Energy (DOE) is conducting thermal remediation to remove non-aqueous phase liquids (NAPLs) from the subsurface at the Northeast Site that is part of the Pinellas Environmental Restoration Project. The Northeast Site is located on the Young - Rainey Science, Technology, and Research (STAR) Center in Largo, Florida. The STAR Center was formerly a DOE facility. The NAPL remediation was performed at Area A and is currently being performed at Area B at the Northeast Site. The remediation at Area A was completed in 2003 and covered an area of 900 m 2 (10,000 ft 2 ) and a depth of remediation that extended to 10.7 m (35 ft) below ground surface. Cleanup levels achieved were at or below maximum contaminant levels in almost all locations. The remediation project at Area B is ongoing and covers an area of 3,240 m 2 (36,000 ft 2 ), a volume of 41,300 m (54,000 yd 3), and a depth of remediation to 12 m (40 ft) below ground surface. In addition, a portion of the subsurface under an occupied building in Area B is included in the remediation. The cleanup levels achieved from this remediation will be available in the Area B Final Report that will be posted on the DOE Office of Legacy Management web site (www.lm.doe.gov/land/sites/fl/ pinellas/pinellas.htm) in January 2007. Electrical resistive heating and steam were the chosen remediation methods at both areas. Lessons learned from the Area A remediation were incorporated into the Area B remediation and could benefit managers of similar remediation projects. (authors)

  18. Site observational work plan for the UMTRA project site at Falls City, Texas

    International Nuclear Information System (INIS)

    1994-09-01

    During surface remedial action, an estimated 7.0 million tons (6.4 million tonnes) of uranium mill tailings and other contaminated materials were consolidated and stabilized on the Falls City site. The ground water protection strategy at the Falls City disposal site for the UMTRA Surface Project (Subpart A of 40 CFR Part 192 (1994)) was an application for supplemental standards, based on Class III (limited use) ground water in the uppermost aquifer. This water is not a current or potential source of drinking water. Ground water from the uppermost aquifer (ground water from the Deweesville/Conquista Members and the Dilworth Member) contains widespread ambient contamination resulting from naturally occurring conditions and from the effects of human activity not related to uranium milling operations (uranium exploration and mining activities). The ground water cannot be effectively cleaned up for drinking or other beneficial purposes using treatment methods reasonably employed by public water supply systems. The U.S. Nuclear Regulatory Commission (NRC) and the state of Texas concurred with the ground water protection strategy for the disposal site in September 1992. Surface remedial action in accord with Subpart A was completed in April 1994. The proposed ground water compliance strategy (Subpart B of 40 CFR Part 192 (1994)) at the Falls City site is to perform no remedial action based on application for supplemental standards because the ground water in the uppermost aquifer is classified as Class III ground water. Class III ground water includes ground water that is not a current or potential source of drinking water because of widespread, ambient contamination that cannot be cleaned up using treatment methods reasonably employed by public water supply systems (40 CFR section 192.11 (e) (1994)). Although supplemental standards are being applied, the potential use of ground water in the site vicinity will be protected

  19. Site observational work plan for the UMTRA Project Site at Tuba City, Arizona

    International Nuclear Information System (INIS)

    1994-09-01

    The requirements for ground water compliance for Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Tuba City, Arizona, site, are found in the Uranium Mill Tailings Radiation Control Act; Subparts B and C of the U.S. Environmental Protection Agency's Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR 192 (1994)), and the associated proposed 1987 standards (52 FR 36000). During the surface remedial action, an estimated 1,400,000 cubic yards (yd 3 ) (1,100,000 cubic meters [m 3 ]) of uranium mill tailings and other contaminated materials were consolidated and stabilized in place in an unlined disposal cell covering 50 acres (20 hectares). The surface remedial action was completed in April 1990. Ground water beneath the Tuba City site was contaminated by subsurface migration of water from uranium ore processing activities. The main source of contaminants was water from the tailings piles that began in 1956 when the mill opened and ended in 1966 when the mill closed. A total of 800,000 tons (725,000 tonnes) of uranium ore were processed onsite over a 10-year period. Two processes were used to refine the ore: an acid leach process and a sodium carbonate alkaline process. Water from these tailings then seeped into the ground and migrated downward to the ground water. The Tuba City site is currently in a post-stabilization, prelicensing status. The preliminary ground water compliance strategy at the Tuba City site is active remediation. The specific technology to be evaluated is in situ bioremediation. This selection was made because of the potential ability of bioremediation to reduce concentrations to lower levels than a conventional extraction system and to minimize disturbance of the water resource

  20. Towards canine rabies elimination: Economic comparisons of three project sites.

    Science.gov (United States)

    Elser, J L; Hatch, B G; Taylor, L H; Nel, L H; Shwiff, S A

    2018-02-01

    An appreciation of the costs of implementing canine rabies control in different settings is important for those planning new or expanded interventions. Here we compare the costs of three canine rabies control projects in South Africa, the Philippines and Tanzania to identify factors that influence the overall costs of rabies control efforts. There was considerable variation in the cost of vaccinating each dog, but across the sites these were lower where population density was higher, and later in the projects when dog vaccination coverage was increased. Transportation costs comprised a much higher proportion of total costs in rural areas and where house-to-house vaccination campaigns were necessary. The association between the cost of providing PEP and human population density was less clear. The presence of a pre-existing national rabies management programme had a marked effect on keeping infrastructure and equipment costs for the project low. Finally, the proportion of the total costs of the project provided by the external donor was found to be low for the projects in the Philippines and South Africa, but likely covered close to the complete costs of the project in Tanzania. The detailed economic evaluation of three recent large-scale rabies control pilot projects provides the opportunity to examine economic costs across these different settings and to identify factors influencing rabies control costs that could be applied to future projects. Published 2017. This article is a U.S. Government work and is in the public domain in the USA.

  1. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2005

    International Nuclear Information System (INIS)

    West Valley Nuclear Services Company WVNSCO and URS Group, Inc.

    2006-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs

  2. Tenure Issues in REDD+ Pilot Project Sites in Tanzania

    Directory of Open Access Journals (Sweden)

    Therese Dokken

    2014-02-01

    Full Text Available REDD+ has been proposed as a viable option for addressing climate change in the near term, and at relatively low cost. There is a broad consensus that clearly defined tenure rights are important for the implementation and success of REDD+, both to manage forests effectively and to protect local communities’ livelihoods. We use primary data from 23 villages in six REDD+ pilot sites in Tanzania to identify causes of deforestation and forest degradation, and tenure rights issues, at the village level prior to project implementation. Further, interviews with project proponents and examination of project documents yields insights into how the proponents plan to address tenure issues. Most villages perceive their tenure as secure and have exclusion rights, while collective action challenges are prevalent in villages experiencing deforestation and forest degradation. These findings suggest that the main tenure issues are related to internal institutional arrangements. While we find that tenure is high on the agenda for all the project proponents, they are mainly focusing on formalization and securing tenure rights from state to community level. Though we do find this to be a precondition for reducing deforestation and degradation, some of their focus should be shifted to strengthening village institutions and enhancing internal compliance.

  3. Hinkley Point 'C' power station public inquiry: proof of evidence on potential off-site effects of radiation

    International Nuclear Information System (INIS)

    Western, D.J.

    1988-09-01

    A public inquiry has been set up to examine the planning application made by the Central Electricity Generating Board (CEGB) for the construction of a 1200 MW Pressurized Water Reactor power station at Hinkley Point (Hinkley Point ''C'') in the United Kingdom. This evidence to the Inquiry is concerned with the potential of the proposed Hinkely Point ''C'' PWR to increase the exposure of members of the public offsite to radiation. The policy is to replicate the design of the Sizewell ''B'' reactor. The evidence examined in great detail at the Sizewell ''B'' Public Inquiry where the Inspector concluded that the risk would be very small. The purpose of this evidence is to provide an explicit account of the potential off-site effects of radiation at the Hinkley Point site, so that it can be seen that there is nothing specific to this location that could lead to a different conclusion. (author)

  4. The network architecture and site test of DCIS in Lungmen nuclear power station

    International Nuclear Information System (INIS)

    Lee, C. K.

    2006-01-01

    The Lungmen Nuclear Power Station (LMNPS) is located in North-Eastern Seashore of Taiwan. LMNPP has two units. Each unit generates 1350 Megawatts. It is the first ABWR Plant in Taiwan and is under-construction now. Due to contractual arrangement, there are seven large I and C suppliers/designers, which are GE NUMAC, DRS, Invensys, GEIS, Hitachi, MHI, and Stone and Webster company. The Distributed Control and Information System (DCIS) in Lungmen are fully integrated with the state-of-the-art computer and network technology. General Electric is the leading designer for integration of DCIS. This paper presents Network Architecture and the Site Test of DCIS. The network architectures are follows. GE NUMAC System adopts the point to point architecture, DRS System adopts Ring type architecture with SCRAMNET protocol, Inevnsys system adopts IGiga Byte Backbone mesh network with Rapid Spanning Tree Protocol, GEIS adopts Ethernet network with EGD protocol, Hitachi adopts ring type network with proprietary protocol. MHI adopt Ethernet network with UDP. The data-links are used for connection between different suppliers. The DCIS architecture supports the plant automation, the alarm prioritization and alarm suppression, and uniform MMI screen for entire plant. The Test Program regarding the integration of different network architectures and Initial DCIS architecture Setup for 161KV Energization will be discussed. Test tool for improving site test schedule, and lessons learned from FAT will be discussed too. And conclusions are at the end of this paper. (authors)

  5. The network architecture and site test of DCIS in Lungmen nuclear power station

    Energy Technology Data Exchange (ETDEWEB)

    Lee, C. K. [Instrument and Control Section, Lungmen Nuclear Power Station, Taiwan Power Company, Taipei County Taiwan (China)

    2006-07-01

    The Lungmen Nuclear Power Station (LMNPS) is located in North-Eastern Seashore of Taiwan. LMNPP has two units. Each unit generates 1350 Megawatts. It is the first ABWR Plant in Taiwan and is under-construction now. Due to contractual arrangement, there are seven large I and C suppliers/designers, which are GE NUMAC, DRS, Invensys, GEIS, Hitachi, MHI, and Stone and Webster company. The Distributed Control and Information System (DCIS) in Lungmen are fully integrated with the state-of-the-art computer and network technology. General Electric is the leading designer for integration of DCIS. This paper presents Network Architecture and the Site Test of DCIS. The network architectures are follows. GE NUMAC System adopts the point to point architecture, DRS System adopts Ring type architecture with SCRAMNET protocol, Inevnsys system adopts IGiga Byte Backbone mesh network with Rapid Spanning Tree Protocol, GEIS adopts Ethernet network with EGD protocol, Hitachi adopts ring type network with proprietary protocol. MHI adopt Ethernet network with UDP. The data-links are used for connection between different suppliers. The DCIS architecture supports the plant automation, the alarm prioritization and alarm suppression, and uniform MMI screen for entire plant. The Test Program regarding the integration of different network architectures and Initial DCIS architecture Setup for 161KV Energization will be discussed. Test tool for improving site test schedule, and lessons learned from FAT will be discussed too. And conclusions are at the end of this paper. (authors)

  6. Ground Motion Uncertainty and Variability (single-station sigma): Insights from Euroseistest, Greece

    Science.gov (United States)

    Ktenidou, O. J.; Roumelioti, Z.; Abrahamson, N. A.; Cotton, F.; Pitilakis, K.

    2014-12-01

    Despite recent improvements in networks and data, the global aleatory uncertainty (sigma) in GMPEs is still large. One reason is the ergodic approach, where we combine data in space to make up for lack of data in time. By estimating the systematic site response, we can make site-specific GMPEs and use a lower, site-specific uncertainty: single-station sigma. In this study we use the EUROSEISTEST database (http://euroseisdb.civil.auth.gr), which has two distinct advantages: good existing knowledge of site conditions at all stations, and careful relocation of the recorded events. Constraining the site and source parameters as best we can, we minimise the within- and between-events components of the global, ergodic sigma. Following that, knowledge of the site response from empirical and theoretical approaches permits us to move on to single-station sigma. The variability per site is not clearly correlated to the site class. We show that in some cases knowledge of Vs30 is not sufficient, and that site-specific data are needed to capture the response, possibly due to 2D/3D effects from complex geometry. Our values of single-station sigma are low compared to the literature. This may be due to the good ray coverage we have in all directions for small, nearby records. Indeed, our single-station sigma values are similar to published single-path values, which means that they may correspond to a fully -rather than partially- non-ergodic approach. We find larger ground motion variability for short distances and small magnitudes. This may be related to the uncertainty in the depth affecting nearby records more, or to stress drop and causing trade-offs between the source and site terms for small magnitudes.

  7. UMTRA Project water sampling and analysis plan, Grand Junction, Colorado. Revision 1, Version 6

    International Nuclear Information System (INIS)

    1995-09-01

    This water sampling and analysis plan describes the planned, routine ground water sampling activities at the Grand Junction US DOE Uranium Mill Tailings Remedial Action (UMTRA) Project site (GRJ-01) in Grand Junction, Colorado, and at the Cheney Disposal Site (GRJ-03) near Grand Junction. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequencies for the routine monitoring stations at the sites. Regulatory basis is in the US EPA regulations in 40 CFR Part 192 (1994) and EPA ground water quality standards of 1995 (60 FR 2854). This plan summarizes results of past water sampling activities, details water sampling activities planned for the next 2 years, and projects sampling activities for the next 5 years

  8. NNC - managing major projects and the lessons learned

    International Nuclear Information System (INIS)

    Clements, J.M.

    1989-01-01

    The formation and development of NNC Ltd (formerly National Nuclear Corporation Ltd) is explained. Its role in the building of 16 nuclear power stations in the UK is outlined. For the last two of these, Heysham-B and Torness, NNC's role as station designer and manager of the nuclear island construction and at Torness as whole site overseers is described. The NNC negotiated and placed all the major contracts for the two stations and developed a budgetary control program through which the Central and South of Scotland Electricity Generating Boards were able to participate in the allotment of budget cover for each contract and for any anticipated variations and claims. Each project had a manager and about 20 responsible engineers plus contract engineers. The government decisions to change to PWR type reactors and to privatise the electricity industry have resulted in changes and structural management in NNC Ltd. (UK)

  9. Optimal Site Selection of Electric Vehicle Charging Stations Based on a Cloud Model and the PROMETHEE Method

    Directory of Open Access Journals (Sweden)

    Yunna Wu

    2016-03-01

    Full Text Available The task of site selection for electric vehicle charging stations (EVCS is hugely important from the perspective of harmonious and sustainable development. However, flaws and inadequacies in the currently used multi-criteria decision making methods could result in inaccurate and irrational decision results. First of all, the uncertainty of the information cannot be described integrally in the evaluation of the EVCS site selection. Secondly, rigorous consideration of the mutual influence between the various criteria is lacking, which is mainly evidenced in two aspects: one is ignoring the correlation, and the other is the unconscionable measurements. Last but not least, the ranking method adopted in previous studies is not very appropriate for evaluating the EVCS site selection problem. As a result of the above analysis, a Preference Ranking Organization Method for Enrichment Evaluations (PROMETHEE method-based decision system combined with the cloud model is proposed in this paper for EVCS site selection. Firstly, the use of the PROMETHEE method can bolster the confidence and visibility for decision makers. Secondly, the cloud model is recommended to describe the fuzziness and randomness of linguistic terms integrally and accurately. Finally, the Analytical Network Process (ANP method is adopted to measure the correlation of the indicators with a greatly simplified calculation of the parameters and the steps required.

  10. Industrial Sites Project Establishment of Final Action Levels

    International Nuclear Information System (INIS)

    Boehlecke, Robert F.

    2006-01-01

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) oversees numerous sites on the Nevada Test Site (NTS) and other locations in the State of Nevada that have been impacted by activities related to the development and testing of nuclear devices and by other activities. NNSA/NSO is responsible for protecting members of the public, including site workers, from harmful exposure to both chemical and radiological contaminants at these sites as they remediate these sites. The Nevada Division of Environmental Protection (NDEP) is the primary state agency responsible for protection of human health and the environment with respect to chemical and radiological wastes. In 1996 the DOE, U.S. Department of Defense, and the State of Nevada entered into an agreement known as the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Appendix VI to the FFACO describes the strategy employed to plan, implement, and complete environmental corrective action activities at NTS and other locations in the state of Nevada. One of the categories of corrective action units (CAUs) is Industrial Sites, which consists of approximately 1,150 locations that may require some level of investigation and corrective action. To evaluate the need for the extent of corrective action at a particular site, NNSA/NSO assesses the potential impacts to receptors by comparing measurements of contaminant concentrations to risk-based (chemical) and dose-based (radionuclide) standards (action levels). Preliminary action levels (PALs) are established as part of the data quality objective (DQO) process, and are presented in one or more FFACO documents generated as part of the corrective action process. This document formally defines and clarifies the NDEP-approved process NNSA/NSO Industrial Sites Project uses to fulfill the requirements of the FFACO and state regulations. This process establishes final action levels (FALs) based on the risk

  11. West Valley Demonstration Project Annual Site Environmental Report Calendard Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2006-09-21

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs.

  12. Preparation of substituting seaweed field mounds accompanying site preparation for No.3 plant in Ikata Nuclear Power Station

    International Nuclear Information System (INIS)

    Ishihara, Hisashi; Oshima, Teruhiko; Fujisaki, Yuichi; Saeki, Taketoshi

    1987-01-01

    Shikoku Electric Power Co., Inc. is constructing No.3 plant adjacently to No.1 and No.2 plants in operation in Ikata Nuclear Power Station. In the coastal area of Iyo-nada, many seaweed fields are distributed, which are important biologically and for fishery. In the works of site preparation for No.3 plant, a part of the site is created by reclamation of sea area, therefore the natural seaweed fields in the area disappear. From the viewpoint of various circumstances and environment preservation, it was decided to create about 60,000 m 2 of seaweed field mounds on the seabed around the site as the substitute for disappearing natural seaweed fields. The Seaweed Field Study Group composed of the men of learning and experience was organized to obtain the guidance on the possibility of creating artificial seaweed fields, the techniques for creation and the effect on environment accompanying the creation of mounds. The creation works were started in October, 1985, and are in progress smoothly utilizing effectively the stones and rocks cut in the site preparation works. The topographic and geological features, sea conditions, the present state of seaweed fields, the experiment on creating artificial seaweed fields, the design and construction of mounds and others are reported. (Kako, I.)

  13. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS - Washington Division

    2008-12-17

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

  14. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    International Nuclear Information System (INIS)

    2008-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment

  15. Implementation green and low cost on landscape design of Manggarai Integrated Station, Jakarta

    Science.gov (United States)

    Suryanti, T.; Meilianti, H.

    2018-01-01

    The Manggarai Integrated Station is the transit of various transportation modes. The Integrated Station located in Manggarai Jakarta and managed by PT. KAI. The Manggarai station is integrated and have terminal nature of transit areas (switching mode of transportation). There are several problems in the site, such as the problem of the site conditions in the urban area, topography, soil, vegetation, space, visual, users on the site can provide ideas for the concepts. The data was analyzed using the quantitative descriptive methode. The purpose of this research is to design the integrated station atmosphere, not only can support of the activities station users, but can also accommodate the needs of the community. It will “Green, Low cost” at the Manggarai integrated transport transit station in Jakarta. The potential that exists in this area is the lowliest integrated from various areas of the mode of transportation that make the users to facilitate transit transportation to the other. The basic concept of this design refers to the “Green, Low Cost” which unite with theme “user friendly” land use on a more efficient and effective site. The result of this research is landscape design development of Manggarai integrated station. Its consists of landscape design in west and east area, transition area, parking area, solar panel area, and social interaction area.

  16. Forsmark site investigation. A deformation analysis of the Forsmark GPS monitoring network from 2005 to 2009

    Energy Technology Data Exchange (ETDEWEB)

    Gustafson, Lars; Ljungberg, Annika (Caliterra AB (Sweden))

    2010-10-15

    The objective of the study is to identify possible movements in the bedrock within and outside the candidate area at Forsmark. Seven physically stable stations were built in the Forsmark area in the autumn of 2005. Stations were established within a ten-kilometer radius. The stations were placed in three different areas separated by regional deformation zones: NE of the Singoe zone, within the candidate area, and SW of the Forsmark zone. Data have been collected in eighteen campaigns, each with a duration of about five days, from November 2005 to December 2009. Stations consist of a stainless steel rod fixed in the bedrock on which the GPS antenna mounts. Each station has dedicated GPS equipment only used at the specific site. Sets consist of a GPS receiver collecting raw GPS data and a choke ring antenna linked to the receiver using a coaxial cable. The receivers and antennas are dual frequency high precision geodetic grade. During each campaign the GPS receiver saves a reading every second for the duration of the five days campaign. The antennas remain mounted on the stations during the entire project, whereas all other equipment is in place at the station only during the campaigns. The measurements were related to the SWEPOS network stations Lovoe, Uppsala and Maartsbo that are defined as stations with stable fundaments by the National Land Survey of Sweden (Lantmaeteriet). This report deals with altogether 18 campaigns. The first 13 campaigns were performed during the period November 2005 to August 2008. However, the number of campaigns has been extended by adding a fourth year to the project. Optimization of the data processing depends on the properties of the entire data set comprising a period of four years. We divided the data into periods of 24 hours with each period processed as a separate session in the Bernese post processing software, after which we analyzed the residuals to conclude that data are of the expected quality. The entire data set from four

  17. Application of point system in the project control of Ling'ao Nuclear Power Station

    International Nuclear Information System (INIS)

    Xie ahai

    2005-01-01

    Schedule control and cost control are very complicated issues even we set up the detail schedules and engineering measurements requirements for erection of a nuclear power project. In order to solve these problems, a Point System is used in Ling Ao (LA) Nuclear Power Project. This paper introduces the method. The Point System is a measurement system of workload. The measurement unit of any erection works is a Point only. A Point of workload is defined as the equivalent measurement quantities, which could be completed by a relevant skill worker within an hour. A set of procedure manuals for different installations has been set up. The calculation models of equipment installation, piping, cabling are addressed for example in the paper. The application of the Point System in the schedule control is shown in the paper. The following issues are highlighted: to define the duration of a piping activity in the Project Level 2 Schedule, to draught the curves of Point Schedules for different erection fields, to analyze the productive efficiency, to define erection quota of each month for different erection teams, to follow up the erection progress on site. The application of the Point System in the payment of erection contract is outlined. The calculation formula of a monthly payment is given. The advantage of the payment calculation method is discussed, for example, more accurate, very easy and clearly to check the measurement quantities completed on site, to control lump-sum cost. (authors)

  18. Performance Analyses of Renewable and Fuel Power Supply Systems for Different Base Station Sites

    Directory of Open Access Journals (Sweden)

    Josip Lorincz

    2014-11-01

    Full Text Available Base station sites (BSSs powered with renewable energy sources have gained the attention of cellular operators during the last few years. This is because such “green” BSSs impose significant reductions in the operational expenditures (OPEX of telecom operators due to the possibility of on-site renewable energy harvesting. In this paper, the green BSSs power supply system parameters detected through remote and centralized real time sensing are presented. An implemented sensing system based on a wireless sensor network enables reliable collection and post-processing analyses of many parameters, such as: total charging/discharging current of power supply system, battery voltage and temperature, wind speed, etc. As an example, yearly sensing results for three different BSS configurations powered by solar and/or wind energy are discussed in terms of renewable energy supply (RES system performance. In the case of powering those BSS with standalone systems based on a fuel generator, the fuel consumption models expressing interdependence among the generator load and fuel consumption are proposed. This has allowed energy-efficiency comparison of the fuel powered and RES systems, which is presented in terms of the OPEX and carbon dioxide (CO2 reductions. Additionally, approaches based on different BSS air-conditioning systems and the on/off regulation of a daily fuel generator activity are proposed and validated in terms of energy and capital expenditure (CAPEX savings.

  19. NASA space station automation: AI-based technology review. Executive summary

    Science.gov (United States)

    Firschein, O.; Georgeff, M. P.; Park, W.; Cheeseman, P. C.; Goldberg, J.; Neumann, P.; Kautz, W. H.; Levitt, K. N.; Rom, R. J.; Poggio, A. A.

    1985-01-01

    Research and Development projects in automation technology for the Space Station are described. Artificial Intelligence (AI) based technologies are planned to enhance crew safety through reduced need for EVA, increase crew productivity through the reduction of routine operations, increase space station autonomy, and augment space station capability through the use of teleoperation and robotics.

  20. Dealing with operational power station wastes

    Energy Technology Data Exchange (ETDEWEB)

    Pepper, R B [Central Electricity Generating Board, London (UK). Nuclear Health and Safety Dept.

    1981-08-01

    The disposal of wastes from nuclear power stations is discussed. Liquid and gaseous wastes, from magnox stations, which are of low level activity, are dispersed to the sea or estuaries on coastal sites or for the case of Trawfynyeld, to the nearby lake. Low activity solid wastes are either disposed of on local authority tips or in shallow land burial sites. Intermediate level wastes, consisting mainly of wet materials such as filter sludges and resins from cooling ponds, are at present stored in shielded storage tanks either dry or under water. Only one disposal route for intermediate waste is used by Britain, namely, sea-dumping. Materials for sea dumping have to be encapsulated in a durable material for example, concrete.

  1. Hygienic situation in the site of nuclear power stations in Fukushima Prefecture

    International Nuclear Information System (INIS)

    Sakka, Masatoshi

    1984-01-01

    In the Fukushima No. 1 Nuclear Power Station in Fukushima Prefecture, the hygienic statistics for ten years each before and after the start of the power station were compared between the surrounding radiation monitoring area and the reference area without such monitoring, both areas containing populations. There was no difference at all between the two areas. It was thus shown that the nuclear power generation had no adverse effect on the health of the people. The following statistics in both areas concerning the health of the populations are described: external exposure dose, internal exposure sources, whole-body exposure dose, the change of the hygienic state around the power station, the number of deaths and mortality in the areas, the deaths from cancer in the areas, the health of children, the causes of deaths in Fukushima Prefecture. (Mori, K.)

  2. Summary of field operations Technical Area I well PGS-1. Site-Wide Hydrogeologic Characterization Project

    International Nuclear Information System (INIS)

    Fritts, J.E.; McCord, J.P.

    1995-02-01

    The Environmental Restoration (ER) Project at Sandia National Laboratories, New Mexico is managing the project to assess and, when necessary, to remediate sites contaminated by the lab operations. Within the ER project, the site-wide hydrogeologic characterization task is responsible for the area-wide hydrogeologic investigation. The purpose of this task is to reduce the uncertainty about the rate and direction of groundwater flow beneath the area and across its boundaries. This specific report deals with the installation of PGS-1 monitoring well which provides information on the lithology and hydrology of the aquifer in the northern area of the Kirtland Air Force Base. The report provides information on the well design; surface geology; stratigraphy; structure; drilling, completion, and development techniques; and borehole geophysics information

  3. The Bonebrake Theological Seminary: Top-Secret Manhattan Project Site

    Science.gov (United States)

    Sopka, Katherine R.; Sopka, Elisabeth M.

    2010-09-01

    We discuss the top-secret Manhattan Project site established at the Bonebrake Theological Seminary in 1943 in Dayton, Ohio, where research on polonium and its production was carried out. The polonium produced there was then transported to Los Alamos to be used in a polonium-beryllium neutron source whose purpose was to ignite the plutonium implosion bomb that would be dropped on Nagasaki, Japan, on August 9, 1945. Our account is based primarily on the recollections of John J. Sopka, research physicist at the Bonebrake laboratory.

  4. Value of Information Analysis Project Gnome Site, New Mexico

    International Nuclear Information System (INIS)

    Pohll, Greg; Chapman, Jenny

    2010-01-01

    The Project Gnome site in southeastern New Mexico was the location of an underground nuclear detonation in 1961 and a hydrologic tracer test using radionuclides in 1963. The tracer test is recognized as having greater radionuclide migration potential than the nuclear test because the tracer test radionuclides (tritium, 90Sr, 131I, and 137Cs) are in direct contact with the Culebra Dolomite aquifer, whereas the nuclear test is within a bedded salt formation. The tracer test is the topic here. Recognizing previous analyses of the fate of the Gnome tracer test contaminants (Pohll and Pohlmann, 1996; Pohlmann and Andricevic, 1994), and the existence of a large body of relevant investigations and analyses associated with the nearby Waste Isolation Pilot Plant (WIPP) site (summarized in US DOE, 2009), the Gnome Site Characterization Work Plan (U.S. DOE, 2002) called for a Data Decision Analysis to determine whether or not additional characterization data are needed prior to evaluating existing subsurface intrusion restrictions and determining long-term monitoring for the tracer test. Specifically, the Work Plan called for the analysis to weigh the potential reduction in uncertainty from additional data collection against the cost of such field efforts.

  5. Progress report on decommissioning activities at the Fernald Environmental Management Project (FEMP) site

    International Nuclear Information System (INIS)

    1998-01-01

    The Fernald Environmental Management Project (FEMP), is located about 18 miles northwest of Cincinnati, Ohio. Between 1953 and 1989, the facility, then called the Feed Material Production Center or FMPC, produced uranium metal products used in the eventual production of weapons grade material for use by other US Department of Energy (DOE) sites. In 1989, FMPC's production was suspended by the federal government in order to focus resources on environmental restoration versus defense production. In 1992, Fluor Daniel Fernald assumed responsibility for managing all cleanup activities at the FEMP under contract to the DOE. In 1990, as part of the remediation effort, the site was divided into five operable units based on physical proximity of contaminated areas, similar amounts of types of contamination, or the potential for a similar technology to be used in cleanup activities. This report continues the outline of the decontamination and decommissioning (D and D) activities at the FEMP site Operable Unit 3 (OU3) and provides an update on the status of the decommissioning activities. OU3, the Facilities Closure and Demolition Project, involves the remediation of more than 200 uranium processing facilities. The mission of the project is to remove nuclear materials stored in these buildings, then perform the clean out of the buildings and equipment, and decontaminate and dismantle the facilities

  6. Development of Base Transceiver Station Selection Algorithm for ...

    African Journals Online (AJOL)

    TEMS) equipment was carried out on the existing BTSs, and a linear algorithm optimization program based on the spectral link efficiency of each BTS was developed, the output of this site optimization gives the selected number of base station sites ...

  7. Implementation of Biogas Stations into Smart Heating and Cooling Network

    Science.gov (United States)

    Milčák, P.; Konvička, J.; Jasenská, M.

    2016-10-01

    The paper is aimed at the description of implementation of a biogas station into software environment for the "Smart Heating and Cooling Networks". The aim of this project is creation of a software tool for preparation of operation and optimization of treatment of heat/cool in small regions. In this case, the biogas station represents a kind of renewable energy source, which, however, has its own operational specifics which need to be taken into account at the creation of an implementation project. For a specific biogas station, a detailed computational model was elaborated, which is parameterized in particular for an optimization of the total computational time.

  8. Review of selected 100-N waste sites related to N-Springs remediation projects

    International Nuclear Information System (INIS)

    DeFord, D.H.; Carpenter, R.W.

    1996-01-01

    This document has been prepared in support of the environmental restoration program at the US Department of Energy's Hanford Site near Richland, Washington, by the Bechtel Hanford, Inc. Facility and Waste Site Research Office. It provides historical information that documents and characterizes selected waste sites that are related to the N-Springs remediation projects. The N-Springs are a series of small, inconspicuous groundwater seepage springs located along the Columbia River shoreline near the 100-N Reactor. The spring site is hydrologically down-gradient from several 100-N Area liquid waste sites that are believed to have been the source(s) of the effluents being discharged by the springs. This report documents and characterizes these waste sites, including the 116-N-1 Crib and Trench, 116-N-3 Crib and Trench, unplanned releases, septic tariks, and a backwash pond

  9. The Miksova water power station

    International Nuclear Information System (INIS)

    2005-01-01

    This leaflet describes the Miksova water power station. The Miksova water power station is part of the second derived cascade of hydro power stations on the river Vah. It was built at the end of a huge development in Slovak hydro-energy in the late 1950's and the beginning of the 1960's. It is the second water power station on this derived cascade, which is situated downstream the Hricov reservoir and water power station. At the power station, three turbine sets with vertical Kaplan turbines are installed with a total power output of 3 x 31.2 = 93.6 MW. With this power output the Miksova water power station (Miksova I) was the biggest water power station in the Slovak Republic until the construction of Pumping water power station Liptovska Mara. And it is still the biggest channel water power station on the Vah so far. It was put into operation during the period 1963 to 1965. There are three turbine sets with Kaplan turbines from CKD Blansko, with a synchronous hydro-alternator installed in the power station. Their installed capacity is 93.6 MW in total and the projected annual production of electrical energy is 207 GWh. The turbines are fi ve-bladed (on the Hricov and Povazska Bystrica water power stations they are four-bladed) and the impeller wheel has a diameter of 4800 mm. They are designed for extension of the head from 24.1 to 22.21 m and each of them has an absorption capacity of 134 m 3 .s -1 nd a nominal operating speed of 2.08 m 3 .s -1 , runaway speed 4.9 m 3 .s -1 . Each synchronous hydro-alternator has a maximum power output of 31.2 MW, a nominal voltage of 10.5 kV and power factor cos φ of 0.8. Power from the power station is led out through 110 kV switchgear. The water power station operates under automatic turbine mode of operation with remote indication and control from the Dispatch Centre at Vodne elektrarne, in Trencin. From start of operation until the end of 2003 all three turbine sets operated for a total of 450,500 running hours and the

  10. The use of on-site Project Officers by a nuclear regulatory body

    International Nuclear Information System (INIS)

    Beare, J.W.

    1977-01-01

    In Canada consideration of applications for licensing nuclear installations is entrusted to the Reactor Safety Advisory Committee within the Atomic Energy Control Board (AECB). The licensing procedure is conducted in three stages (site approval, construction licence, operating licence). In order to control construction and operation of nuclear installations Project Officers are assigned to each particular installation. The policy of AECB is to send these officers on site several months before the reactor reaches criticality; and during reactor operation. This system clearly provides great practical advantages. (NEA) [fr

  11. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006

    International Nuclear Information System (INIS)

    2007-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment

  12. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2007-09-27

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment.

  13. UMTRA project water sampling and analysis plan, Falls City, Texas. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Falls City, Texas, are described in this water sampling and analysis plan (WSAP). The following plan identifies and justifies the sampling locations, analytical parameters, and sampling frequency for the routine monitoring stations at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US Environmental Protection Agency (EPA) regulations in 40 CFR Part 192. Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site. The Falls City site is in Karnes County, Texas, approximately 8 miles [13 kilometers southwest of the town of Falls City and 46 mi (74 km) southeast of San Antonio, Texas. Before surface remedial action, the tailings site consisted of two parcels. Parcel A consisted of the mill site, one mill building, five tailings piles, and one tailings pond south of Farm-to-Market (FM) Road 1344 and west of FM 791. A sixth tailings pile designated Parcel B was north of FM 791 and east of FM 1344

  14. Next Generation Nuclear Plant Project Evaluation of Siting a HTGR Co-generation Plant on an Operating Commercial Nuclear Power Plant Site

    International Nuclear Information System (INIS)

    Demick, L.E.

    2011-01-01

    This paper summarizes an evaluation by the Idaho National Laboratory (INL) Next Generation Nuclear Plant (NGNP) Project of siting a High Temperature Gas-cooled Reactor (HTGR) plant on an existing nuclear plant site that is located in an area of significant industrial activity. This is a co-generation application in which the HTGR Plant will be supplying steam and electricity to one or more of the nearby industrial plants.

  15. Next Generation Nuclear Plant Project Evaluation of Siting a HTGR Co-generation Plant on an Operating Commercial Nuclear Power Plant Site

    Energy Technology Data Exchange (ETDEWEB)

    L.E. Demick

    2011-10-01

    This paper summarizes an evaluation by the Idaho National Laboratory (INL) Next Generation Nuclear Plant (NGNP) Project of siting a High Temperature Gas-cooled Reactor (HTGR) plant on an existing nuclear plant site that is located in an area of significant industrial activity. This is a co-generation application in which the HTGR Plant will be supplying steam and electricity to one or more of the nearby industrial plants.

  16. Design of photovoltaic central power station concentrator array

    Energy Technology Data Exchange (ETDEWEB)

    1984-02-01

    A design for a photovoltaic central power station using tracking concentrators has been developed. The 100 MW plant is assumed to be located adjacent to the Saguaro Power Station of Arizona Public Service. The design assumes an advanced Martin Marietta two-axis tracking fresnel lens concentrator. The concentrators are arrayed in 5 MW subfields, each with its own power conditioning unit. The photovoltaic plant output is connected to the existing 115 kV switchyard. The site specific design allows detailed cost estimates for engineering, site preparation, and installation. Collector and power conditioning costs have been treated parametrically.

  17. SITEX 2.0: Projections of protein functional sites on eukaryotic genes. Extension with orthologous genes.

    Science.gov (United States)

    Medvedeva, Irina V; Demenkov, Pavel S; Ivanisenko, Vladimir A

    2017-04-01

    Functional sites define the diversity of protein functions and are the central object of research of the structural and functional organization of proteins. The mechanisms underlying protein functional sites emergence and their variability during evolution are distinguished by duplication, shuffling, insertion and deletion of the exons in genes. The study of the correlation between a site structure and exon structure serves as the basis for the in-depth understanding of sites organization. In this regard, the development of programming resources that allow the realization of the mutual projection of exon structure of genes and primary and tertiary structures of encoded proteins is still the actual problem. Previously, we developed the SitEx system that provides information about protein and gene sequences with mapped exon borders and protein functional sites amino acid positions. The database included information on proteins with known 3D structure. However, data with respect to orthologs was not available. Therefore, we added the projection of sites positions to the exon structures of orthologs in SitEx 2.0. We implemented a search through database using site conservation variability and site discontinuity through exon structure. Inclusion of the information on orthologs allowed to expand the possibilities of SitEx usage for solving problems regarding the analysis of the structural and functional organization of proteins. Database URL: http://www-bionet.sscc.ru/sitex/ .

  18. Impacts on particles and ozone by transport processes recorded at urban and high-altitude monitoring stations

    International Nuclear Information System (INIS)

    Nicolás, J.F.; Crespo, J.; Yubero, E.; Soler, R.; Carratalá, A.; Mantilla, E.

    2014-01-01

    In order to evaluate the influence of particle transport episodes on particle number concentration temporal trends at both urban and high-altitude (Aitana peak-1558 m a.s.l.) stations, a simultaneous sampling campaign from October 2011 to September 2012 was performed. The monitoring stations are located in southeastern Spain, close to the Mediterranean coast. The annual average value of particle concentration obtained in the larger accumulation mode (size range 0.25–1 μm) at the mountain site, 55.0 ± 3.0 cm − 3 , was practically half that of the value obtained at the urban station (112.0 ± 4.0 cm − 3 ). The largest difference between both stations was recorded during December 2011 and January 2012, when particles at the mountain station registered the lowest values. It was observed that during urban stagnant episodes, particle transport from urban sites to the mountain station could take place under specific atmospheric conditions. During these transports, the major particle transfer is produced in the 0.5–2 μm size range. The minimum difference between stations was recorded in summer, particularly in July 2012, which is most likely due to several particle transport events that affected only the mountain station. The particle concentration in the coarse mode was very similar at both monitoring sites, with the biggest difference being recorded during the summer months, 0.4 ± 0.1 cm − 3 at the urban site and 0.9 ± 0.1 cm − 3 at the Aitana peak in August 2012. Saharan dust outbreaks were the main factor responsible for these values during summer time. The regional station was affected more by these outbreaks, recording values of > 4.0 cm − 3 , than the urban site. This long-range particle transport from the Sahara desert also had an effect upon O 3 levels measured at the mountain station. During periods affected by Saharan dust outbreaks, ozone levels underwent a significant decrease (3–17%) with respect to its mean value. - Highlights:

  19. Solidifying power station resins and sludges

    International Nuclear Information System (INIS)

    Willis, A.S.D.; Haigh, C.P.

    1984-01-01

    Radioactive ion exchange resins and sludges arise at nuclear power stations from various operations associated with effluent treatment and liquid waste management. As the result of an intensive development programme, the Central Electricity Generating Board (CEGB) has designed a process to convert power station resins and sludges into a shielded, packaged solid monolithic form suitable for final disposal. Research and development, the generic CEGB sludge/resin conditioning plant and the CEGB Active Waste Project are described. (U.K.)

  20. International Remote Monitoring Project Embalse Nuclear Power Station, Argentina Embalse Remote Monitoring System

    International Nuclear Information System (INIS)

    Schneider, Sigfried L.; Glidewell, Donnie D.; Bonino, Anibal; Bosler, Gene; Mercer, David; Maxey, Curt; Vones, Jaromir; Martelle, Guy; Busse, James; Kadner, Steve; White, Mike; Rovere, Luis

    1999-01-01

    The Autoridad Regulatoria Nuclear of Argentina (ARN), the International Atomic Energy Agency (IAEA), ABACC, the US Department of Energy, and the US Support Program POTAS, cooperated in the development of a Remote Monitoring System for nuclear nonproliferation efforts. This system was installed at the Embalse Nuclear Power Station last year to evaluate the feasibility of using radiation sensors in monitoring the transfer of spent fuel from the spent fuel pond to dry storage. The key element in this process is to maintain continuity of knowledge throughout the entire transfer process. This project evaluated the fundamental design and implementation of the Remote Monitoring System in its application to regional and international safeguard efficiency. New technology has been developed to enhance the design of the system to include storage capability on board sensor platforms. This evaluation has led to design enhancements that will assure that no data loss will occur during loss of RF transmission of the sensors

  1. Technical Analysis of the Hydrogen Energy Station Concept, Phase I and Phase II

    Energy Technology Data Exchange (ETDEWEB)

    TIAX, LLC

    2005-05-04

    Phase I Due to the growing interest in establishing a domestic hydrogen infrastructure, several hydrogen fueling stations already have been established around the country as demonstration units. While these stations help build familiarity with hydrogen fuel in their respective communities, hydrogen vehicles are still several years from mass production. This limited number of hydrogen vehicles translates to a limited demand for hydrogen fuel, a significant hurdle for the near-term establishment of commercially viable hydrogen fueling stations. By incorporating a fuel cell and cogeneration system with a hydrogen fueling station, the resulting energy station can compensate for low hydrogen demand by providing both hydrogen dispensing and combined heat and power (CHP) generation. The electrical power generated by the energy station can be fed back into the power grid or a nearby facility, which in turn helps offset station costs. Hydrogen production capacity not used by vehicles can be used to support building heat and power loads. In this way, an energy station can experience greater station utility while more rapidly recovering capital costs, providing an increased market potential relative to a hydrogen fueling station. At an energy station, hydrogen is generated on-site. Part of the hydrogen is used for vehicle refueling and part of the hydrogen is consumed by a fuel cell. As the fuel cell generates electricity and sends it to the power grid, excess heat is reclaimed through a cogeneration system for use in a nearby facility. Both the electrical generation and heat reclamation serve to offset the cost of purchasing the equivalent amount of energy for nearby facilities and the energy station itself. This two-phase project assessed the costs and feasibility of developing a hydrogen vehicle fueling station in conjunction with electricity and cogenerative heat generation for nearby Federal buildings. In order to determine which system configurations and operational

  2. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Arnold, P.J.

    1982-11-01

    The systems benefits of the selection of the Sizewell site for a PWR power station are dealt with. The transmission modifications which would be needed to provide effective connection of this station to the system are considered. (U.K.)

  3. Siting of nuclear power stations and the scope of preoperational investigations with special considerations of demographic aspects and the economic utilization of the neighbouring areas

    International Nuclear Information System (INIS)

    Bijak, J.

    1976-01-01

    The studies are presented on the location of atomic power stations in Poland made so far. The methods used in the studies are described which were done in two stages: preliminary location studies on the macroregional scale, and location studies on one or more of the chosen locations. Part one deals with general conditions which have to be met for location of atomic power stations and with preliminary assumptions accepted by GBS i PE ''Energoprojekt'' for location studies. Regulations and recommendations for establishing sites for atomic power stations are also given. Special location conditions are dealt with more extensively, the enviromental hazards and the need for their studies being particularly emphasized. Part two describes the scope of studies made prior to and after the time location investigations. Demographic studies and the economic utilization of the neighbouring areas are presented in more detail. (author)

  4. Net community production and metabolic balance at the oligotrophic ocean site, station ALOHA

    Science.gov (United States)

    le B. Williams, Peter J.; Morris, Paul J.; Karl, David M.

    2004-11-01

    To test the hypothesis that in oligotrophic areas of the ocean respiration exceeds production, a 12-month study was undertaken of in vitro-determined net oxygen production and consumption in the top 150 m of the water column at the extreme oligotrophic site, Station ALOHA, in the North Pacific subtropical gyre. Throughout the year the water column was observed to be in metabolic deficit, the calculated cumulative shortfall being 9±1.7 mol O2 m-2 a-1 (approximately 100 g C m-2 a-1), an amount equivalent to 40% of measured production (annual estimated rates of production and consumption were, respectively, 22 and 31 mol O2 m-2 a-1). We consider three possible explanations for the observed deficit: the in vitro oxygen rate measurements, in themselves, are fundamentally flawed and should be discounted, the observations are correct and the observed deficit is a true account of the balance of oxygen (and organic carbon) at Station ALOHA, or the observations are correct as they stand, but need not be interpreted as organic carbon imbalance for that ecosystem. We find no error unique to the oxygen rate measurements themselves. We find also no evidence that the associated organic carbon deficit can be sustained over the long-term by internal organic reserves or by external subsidy. Accordingly we accept the geochemical findings that calculated in situ oxygen flux requires the euphotic zone of the water column at this site to be slightly (circa 2 mol C m-2 a-1) autotrophic, in contrast to the simple analysis of our observations which gives a net heterotrophic water column. We discuss a number of processes that may give rise to the observed discrepancy. In part it may derive from the difficulty of reproducing the variations in the light field experienced by an algal cell due to vertical advection. It may also derive from the intermittency of production. This latter effect would manifest itself in the following manner. Because of its universal distribution in the food web

  5. Managing Pre-Construction and Construction Risks on Project Sites in Abuja-Nigeria

    Directory of Open Access Journals (Sweden)

    Jimoh R.A.

    2016-03-01

    Full Text Available Managing risks in construction projects has been acknowledged as a key direction process for the purposes of attaining the project goal in terms of time, cost, quality, safety, and environmental sustainability. Hence, the paper evaluated pre-construction and construction risks on active project sites in Abuja-Nigeria. This was achieved using survey method through the self-administration of 35 questionnaires to the professionals handling the 35 identified projects being undertaking at that time. Results showed that errors and omissions in design and improperly defined project scope had mean score values of 3.03 and 2.54, respectively, were the construction risks most experienced by the professionals during pre-construction. On the other hand, fluctuation in market prices and delays with mean score values of 3.14 and 2.74, respectively, were the construction risks experienced by the professionals during the construction phase of the projects. It is recommended that procurement methods such as construction management should be adopted and stakeholders should keep to their own side of the bargain to avoid unnecessary delays.

  6. Siting Conflicts in Renewable Energy Projects in Sweden: Experiences From the Siting of a Biogas Plant

    Energy Technology Data Exchange (ETDEWEB)

    Khan, Jamil

    2001-05-01

    This paper seeks to contribute to an increased understanding of what characterises conflicts regarding the siting of renewable energy facilities. The paper starts out with a brief introduction to different types of renewable energy and the conflicts they might generate as well as a discussion about the differences and similarities in comparison with conflicts over more controversial issues, such as nuclear plants, chemical factories and the construction of roads. The main part of the paper discusses the results from a case study on a failed attempt to site a biogas plant in southern Sweden. The results show that there was a lack of public participation in the early stages of planning, and that peoples negative perceptions of the possibilities to influence the decision-making and of the attitude of the developer, contributed to the development of a public opposition and a polarisation of the conflict. There is also a discussion about the reasons for a shift in the political support for the project and about the role of the legislation in shaping planning processes that either handle conflicts or make them worse. The paper concludes with the observation that the biogas case, in many ways, resembled traditional siting conflicts and that further research is needed to explore the nature of different renewable energy siting conflicts.

  7. Reducing lighting electricity use in underground metro stations

    International Nuclear Information System (INIS)

    Casals, Miquel; Gangolells, Marta; Forcada, Núria; Macarulla, Marcel

    2016-01-01

    Highlights: • Lighting systems are big energy consumers in underground metro stations. • An adaptive lighting system strategy is developed for underground stations. • Dimming controls are based on station occupancy levels and maintenance cycles. • The k-means clustering technique is used to identify stations’ occupancy patterns. • Savings were found to amount to 255.47 MW h in 2 years for a case study metro network. - Abstract: Lighting systems are usually one of the largest electrical end-uses in underground metro stations. Taking into account that budget restrictions in publicly owned companies hinder energy efficiency retrofit projects that require high initial investments, affordable energy saving strategies are needed. This paper presents a low-cost approach for reducing lighting electricity use in underground stations, without affecting passengers’ comfort or the metro operator’s service. For this purpose, an adaptive lighting strategy of dimming the illuminance levels of artificial light sources has been developed. Dimming controls are based on the occupancy of the station, and the preventive maintenance and cleaning cycles of the luminaires. The stations’ monthly occupancy patterns are defined through the k-means clustering technique. To illustrate its effectiveness, the method was applied to 115 underground stations of the Barcelona metro network. The results revealed overall electricity savings of 255.47 MW h on a biannual basis, which represents 36.22% of the stations’ baseline lighting consumption. Individual energy savings were found to range from 25 to 87.5 MW h/year in the stations of the Barcelona metro network, depending on the number and profile of station users. The research findings will undoubtedly be useful for the future energy efficiency project plans of worldwide metro operators and managers of other underground spaces.

  8. Groundwater remediation project at Stockem railway station following a pollution with MIAK (Methyl Isoamyl Ketone)

    Energy Technology Data Exchange (ETDEWEB)

    Daelemans, A.; Boden, A.; Schuyteneer, L.W. de; Achter, L.H. van [Soil Service of Belgium, Leuven-Heverlee (Belgium)

    2003-07-01

    On the 20{sup th} of January 2000, a derailment accident happened near the railway station of Stockem in the vicinity of the city of Arlon. An estimated 20.000 litres of MIAK (methyl isoamyl ketone or 5-methyl-2-hexanone) was spilled and lost into the soil. Immediately after the accident, the Soil Service of Belgium received a request from the Belgian National Railway Company to establish an emergency plan for the remediation of the spill, including the design and the follow-up of the clean up operations. The calamity happened to the West of the railway station at a height of 360 m above sea level and in the vicinity of the Semois river (200 m to the South). From a geological point of view, the Formation of Florenville is outcropping at the site. This formation is characterized by an alternation of sandy sediments and sandstone layers. Locally the rock layer are porous allowing vertical migration of the water. The formation is an important but vulnerable aquifer. Further to the South, water is extracted from the aquifer in large quantities for both public distribution and bottling purposes. The spilled product, 5-methyl-2-hexanone (MIAK), has a typical fruity odour and its density is slightly lower than water. The product is relative mobile and fairly easy degraded biologically in low concentrations. (orig.)

  9. Projected costs of generating electricity from nuclear and coal-fired power stations for commissioning in 1995

    International Nuclear Information System (INIS)

    1986-01-01

    This report updates and extends the previous NEA study, ''The Costs of Generating Electricity in Nuclear and Coal-fired Power Stations'', published by the OECD in late 1983. Despite the changed expectations concerning coal prices and the considerable movements in exchange rates since the first study was completed, the conclusions remain essentially the same. Nuclear Power is projected to be economically superior by a significant margin to coal-fired plants for base load electricity production in Europe, Japan and some regions of North America. In areas of North America in close proximity to supplies of cheap coal, this would be the more economic fuel, unless future nuclear investment costs can be reduced to match the best US and Canadian experience. In all regions considered, the economic advantage of both coal and nuclear over oil and gas-fired plants for commissioning in the mid-1990s is expected to be substantial. These conclusions are based on an analysis of cost projections for 900 MWe to 1400 MWe Light Water Reactors to be commissioned in 1995, operating at a levelised load factor of about 72 per cent over an assumed 25 years economic life and calculated with a 5 per cent (real) discount rate. This parallels the reference reactor selected for the NEA report ''The Economics of the Nuclear Fuel Cycle'', which was published by the OECD in June 1985, though it deviates somewhat from the reference conditions of the previous generation cost study. Contemporary coal-fired stations ranging in capacity from 330 MWe to 700 MWe with the same assumed economic life and load factor provide the basis for comparison. Some data are included on CANDU Pressurised Heavy Water Reactors, and a brief comment is annexed on the relevance of the comparisons for the smaller plants that may be of interest to countries with smaller electricity networks or where special circumstances apply

  10. Operation and management of United Central Piping LPG supply stations in Shenzhen

    Energy Technology Data Exchange (ETDEWEB)

    Lai Yankai

    1997-11-01

    Shenzhen has based its city gas development project on the eventual conversion to natural gas supply by way of central piping LPG supply stations. To fully exploit the potential gas supply capability of every central piping station and cut down the total running cost, we have been connecting the existing supply stations and their piping system into a network, which not only provided a more reliable gas supply performance, but can greatly simplify the evacuation of gas stations from the ever-expanding downtown areas to suburbs. Through this way, the periodic gas stock held by individual stations can be transferred to storage terminal or stations of enough holding capability; the supplying distance has been much lengthened and the gas volume held in the piping system increased; gas supply covered by small stations has been shifted to new and large stations. By linking these stations, we are able to provide pipeline LP gas supply for a large area, and in the same time lay down the pipeline infrastructure for the upcoming LNG supply so that an easy conversion to LNG supply can be secured as soon as the projected LNG terminal is put to service. (au)

  11. Leaf Beetles (Coleoptera ; Chrysomelidae) in the Campus and Agricultural Research Stations of Chiang Mai University, Thailand

    OpenAIRE

    Umemura, S; Tayutivutukul, J; Nakamura, H

    2005-01-01

    Qualitative surveys of leaf beetles were conducted at 5 survey sites (Chiang Mai University, Mae Hia Staion, Chang Kien Station, Nong Hoi Station, Suburb of Chiang Mai City) in Chiang Mai, Thailand using sweeping and beating methods from October 19th to October 30th, 2003. A total of 24 species of 8 subfamilies was collected from five survey sites ; 11 species, 3 species, 2 species, 11 species, 4 species from Chiang Mai University, Mae Hia Station, Chang Kien Station, Nong Hoi Station, Suburb...

  12. CAREM-25. Project recovery plan of the site at Lima

    International Nuclear Information System (INIS)

    De Arenaza, Ignacio J.

    2009-01-01

    In a current global context where the pro-environmental, preservation and recycling trends are more and more strong and influential, it was decided to lay out the CAREM-25 Reactor in the Site of the ex PEAP (Heavy Water Experimental Plant) at Lima (Province of Buenos Aires). This is the reason why it was decided to recover the great part of the facilities located in that Site for the current Project; not only to be used during the construction period but also for the subsequent operation of the CAREM-25 Nuclear Power Plant. Likewise, it was proposed to project the 'Nuclear Power Plants Services Centre', which will provide services to the power plants located in the area. On the other hand, with the transference of the Site it was also 'inherited' an environmental liability, whose dangerousness or harmfulness should have been evaluated. Given that CAREM-25 prototype is presented as a non-pollutant, innovative and next generation alternative, it is the intention of the Management to remedy those potentially dangerous environmental situations. During year 2003 the ex PEAP was dismantled, and the great part of its civil works where retained (buildings, basis, pools, sheds). Most of these facilities will be recycled to satisfy the new uses. The before mentioned recovery was put forward in such a way to pursue some basic guidelines, such as: a)To maintain the historical origin of the buildings; b)To consolidate the condition of the facility as a prototype; c)To confirm the environmentally friendly condition of the CAREM-25 Project. In addition to the adaptation and renovation of the buildings persistent of the ex PEAP, it will be reused the sanitary and services infrastructure, whose adaptation should be to respond to the amount of personnel expected both for the carrying out of the construction and the future operation condition of the plant and the operation of the Services Centre. The remaining fire facilities, which are of vital importance in this kind of projects

  13. Fiscal 1996 research report on the PV power generation field test project for public facilities. Evaluation and analysis of collected data for every site (1/2); 1996 nendo kokyo shisetsu nadoyo taiyoko hatsuden field test jigyo ni okeru shushu data hyoka kaiseki. Kaku site betsu (1/2)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    As a part of the PV power generation field test project, this report summarizes the monthly collected data for every site in fiscal 1996. The test sites include various public facilities such as park, school, university, museum, Shinkansen platform, laboratory, technical center, training building, local governmental hotel, health athletic center, community center, joint purchase center, consumers' cooperative (CO-OP), school meals provision center, prefectural office building, police station garage, water purification plant, general disaster prevention center, and health center. Collected data items are as follows: total solar irradiation (kWh/m{sup 2}), average air temperature, array power, system power, load power, power system supply load, reverse power flow, self supply load (kWh for every item), system disinterconnection time (min), system operation time (min), equivalent array/system operation time, array/system performance ratio, system use factor, system generation efficiency, effective inverter efficiency, and inverter load factor. (NEDO)

  14. Lessons learned in digital upgrade projects digital control system implementation at US nuclear power stations

    International Nuclear Information System (INIS)

    Kelley, S.; Bolian, T. W.

    2006-01-01

    AREVA NP has gained significant experience during the past five years in digital upgrades at operating nuclear power stations in the US. Plants are seeking modernization with digital technology to address obsolescence, spare parts availability, vendor support, increasing age-related failures and diminished reliability. New systems offer improved reliability and functionality, and decreased maintenance requirements. Significant lessons learned have been identified relating to the areas of licensing, equipment qualification, software quality assurance and other topics specific to digital controls. Digital control systems have been installed in non safety-related control applications at many utilities within the last 15 years. There have also been a few replacements of small safety-related systems with digital technology. Digital control systems are proving to be reliable, accurate, and easy to maintain. Digital technology is gaining acceptance and momentum with both utilities and regulatory agencies based upon the successes of these installations. Also, new plants are being designed with integrated digital control systems. To support plant life extension and address obsolescence of critical components, utilities are beginning to install digital technology for primary safety-system replacement. AREVA NP analyzed operating experience and lessons learned from its own digital upgrade projects as well as industry-wide experience to identify key issues that should be considered when implementing digital controls in nuclear power stations

  15. A multidisciplinary approach to site remediation and management in a bedrock environment

    Energy Technology Data Exchange (ETDEWEB)

    Millard, G. [Shell Canada Ltd., Calgary, AB (Canada); Micklethwaite, R.; Digel, S.; Lyons, E. [O' Connor Associates Environmental Inc., Calgary, AB (Canada)

    2006-07-01

    A multidisciplinary approach to site remediation and management in a bedrock environment was presented. This presentation provided a description of the site which was a former service station from 1985 to 2003 in Calgary. Illustrations of the subject site and stratigraphic section were presented along with initial environmental conditions. The project objectives included: managing the site so that a tenant could re-develop and occupy the site; minimizing management costs until long-term, remediation could be achieved; and, developing and implementing a plan to assess, mitigate, and manage the risk in a manner accepted by Alberta Environment and the City of Calgary. The presentation also addressed issues regarding a risk-assessment, high vacuum extraction system, and refining HVE operations. The regulatory, business and ancillary outcomes of the risk assessment were also outlined. Last, the presentation identified how the results were achieved. tabs., figs.

  16. Site specific statutory compliance planning for the salt repository project at the Deaf Smith County Site, Texas: Requirements, strategy, and status: Revision 4

    International Nuclear Information System (INIS)

    1986-06-01

    This document and the requirements and actions it presents are addressed to the Deaf Smith County Site, Texas. The proposed actions upon which the plan is based are those described in Chapters 4 and 5 of the final EA for the site. Similarly, the environmental and health and safety requirements covered in the plan are those identified in the EA as being potentially applicable to the salt repository project at the Deaf Smith site. 12 figs., 8 tabs

  17. Accommodating life sciences on the Space Station

    Science.gov (United States)

    Arno, Roger D.

    1987-01-01

    The NASA Ames Research Center Biological Research Project (BRP) is responsible for identifying and accommodating high priority life science activities, utilizing nonhuman specimens, on the Space Station and is charged to bridge the gap between the science community and the Space Station Program. This paper discusses the approaches taken by the BRP in accomodating these research objectives to constraints imposed by the Space Station System, while maintaining a user-friendly environment. Consideration is given to the particular research disciplines which are given priority, the science objectives in each of these disciplines, the functions and activities required by these objectives, the research equipment, and the equipment suits. Life sciences programs planned by the Space Station participating partners (USA, Europe, Japan, and Canada) are compared.

  18. The local impacts of nuclear stations

    International Nuclear Information System (INIS)

    Gammon, K.M.

    1981-01-01

    The paper looks at the various non-radiological impacts of nuclear power stations on the environment which are grouped as ecological, amenity and socio-economic effects. The study and assessment of environment impacts are explained and comparisons made between those from nuclear and coal fired power stations. The prediction of future effects and judgement of their significance is difficult but is helped by the procedures evolved and by knowledge from the construction and operation of a large number of projects in physically different locations. Research is also needed into new issues and this must be recognised early. From experience of a number of nuclear stations it appears that the local impacts are acceptable provided care is taken. (author)

  19. From city’s station to station city. An integrative spatial approach to the (redevelopment of station areas

    Directory of Open Access Journals (Sweden)

    Ana Luísa Martins da Conceição

    2014-12-01

    Full Text Available Since its origin, the railway station has had a complicated relationship with the city, demanding periodical updates, particularly regarding spatial issues. With the aim of improving the liveability of station areas, current redevelopment projects are reconceptualising them as balanced transport ‘nodes’ and ‘places’ in the city. However, the proposed spatial solutions do not fully support the sought after economic, social and environmental performances. These intentions continue to be predominantly bounded with the (abstract planological level, not finding appropriate translation at the (concrete spatial design level. Further, the interdisciplinary nature of the highly complex planning and design processes of station areas, which should contribute to enhance the performance of their spaces, reinforces constraints and relegates architecture to a marginal role in this quest. It is thus necessary to understand how architecture can contribute to the improvement of the spatial performance of contemporary stations areas, supporting their current reconceptualization. To gain this understanding, the research explored the factors which influence the spatial definition and performance of European High Speed Train station areas, using “design research” and “research by design”. Via a theoretical integrative framework, synthesized from knowledge developed by architecture and other sciences, case studies of ‘through’ stations were analysed and compared. Six cases, encapsulating the most recurrent relative positions of the railway (infrastructure and the station building towards the(ir direct built environment, were chosen out of a large sample. For each category (cases with railway tracks at (a ground level, (b elevated level and (c underground level, two cases, featuring an adapted station building and a newly built one, were studied. Their physical and functional characteristics were mapped at several scales and moments (in history, as

  20. Yucca Mountain Site Characterization Project exploratory studies facilities construction status

    International Nuclear Information System (INIS)

    Allan, J.N.; Leonard, T.M.

    1993-01-01

    This paper discusses the progress to date on the construction planning and development of the Yucca Mountain Site Characterization Project (YMP) Exploratory Studies Facilities (ESF). The purpose of the ESF is to determine early site suitability and to characterize the subsurface of the Yucca Mountain site to assess its suitability for a potential high level nuclear waste repository. The present ESF configuration concept is for two main ramps to be excavated by tunnel boring machines (TBM) from the surface to the Topopah Spring Member of the Paintbrush Tuff Formation. From the main ramps, slightly above Topopah Spring level, supplemental ramps will be penetrated to the Calico Hills formation below the potential repository. There will be exploratory development drifts driven on both levels with the Main Test Area being located on the Topopah Spring level, which is the level of the proposed repository. The Calico Hills formation lies below the Topopah Spring member and is expected to provide the main geo-hydrologic barrier between the potential repository and the underlying saturated zones in the Crater Flat Tuff

  1. Nuclear power stations. Information paper no. 1. Controls on the building and running of nuclear power stations

    Energy Technology Data Exchange (ETDEWEB)

    1981-09-01

    Controls and constraints which govern the development and running of nuclear power stations are briefly examined. Government policy, permission to build, authority to start building, site acquisition building, running and public opinion are briefly discussed.

  2. H2moves.eu Scandinavia. ''Experience from operating a 70 MPa hydrogen refuelling station in Oslo''. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Sloth, M.

    2013-02-15

    As part of the H2MOVES Scandinavia project H2 Logic were to construct a large scale hydrogen refuelling station (HRS) in Oslo providing hydrogen for FCEV's from Daimler and Hyundai in the project. The effort has provided extensive results and lessons learned across the entire process from site selection, HRS design and manufacturing to the final installation and operation. An extensive site screening of more than 30 sites in Oslo was firstly conducted to identify the most optimal location for the HRS. A suitable site was identified at the research organisation SINTEF in Gaustad in the western part of Oslo. The location was strategically well located with regards to the other HRS's in the city ensuring good refuelling coverage in Oslo. The HRS was manufactured, installed and operated by H2 Logic based on the company's H2Station technology. The HRS provides 70MPa refuelling in accordance with the SAE J2601, and operation results have confirmed refuelling times consistently below four minutes for a full tank. The HRS includes onsite electrolysis production providing a 20kg/day base load supply, with potentially additional trucking-in of hydrogen up to a total capacity of 200kg/day. The installation of the HRS took in total 10 days, from arrival at site, until first refuelling was conducted. This included local inspection by third parties and authorities as well as several days of hydrogen production and compression to reach the necessary refuelling pressure. Before opening a refuelling recommendation process was successfully conducted by Daimler. The HRS opened on 21st November 2011 and has been operated for 13,5 months during the remainder project period (ending December 2012). The HRS is expected to continue operation beyond the project. Below are shown the major operation results from the HRS during the project: 1) 701 kg dispensed; 2) 313 refueling's conducted; 3) Average availability of 97% during first half of 2012; 4) 53% of all down

  3. Safety aspects of station blackout at nuclear power plants

    International Nuclear Information System (INIS)

    1985-03-01

    The principal focus of this report is on existing light water reactor nuclear power plants. However, many of the considerations discussed herein can be equally applied to new plants, i.e. those not yet in construction. This report is organized to provide a description of design and procedural factors which safety assessments and reviews of operating experience have shown to be important. These are divided into the off-site power system, the on-site AC power systems and alternate (or nearby) sources of power. The latter may be used in the unlikely event that both normal off-site and on-site sources fail. It must be emphasized that first priority should be placed on designing and maintaining high reliability of both the off-site and on-site AC power systems. This basic concept also applies to the capabilities for restoring power sources which failed and making use of all available alternative and nearby power sources during an emergency, to restore AC power in a prompt manner. Discussions on these aspects are provided in chapters 2 and 3 of this report. Because the expected event frequency and associated confidence in such estimations of station blackout are uncertain, preparations should be made to deal with a station blackout. The nature of those preparations, whether they be optimizing emergency procedures to use existing equipment, modifying this equipment to enhance capabilities, or adding new components or systems to cope with station blackout, must be made in light of plant-specific assessments and regulatory safety philosophies/requirements. Discussions on these matters are provided in chapter 4. General and specific conclusions and recommendations are provided in chapter 5. Appendix A provides a description of several case studies on station blackout and loss of off-site power. Abstracts of papers and presentations are provided in Appendix B with authors and affiliations identified to facilitate personal contact. The References and Bibliography contain a

  4. Streamflow characteristics at hydrologic bench-mark stations

    Science.gov (United States)

    Lawrence, C.L.

    1987-01-01

    The Hydrologic Bench-Mark Network was established in the 1960's. Its objectives were to document the hydrologic characteristics of representative undeveloped watersheds nationwide and to provide a comparative base for studying the effects of man on the hydrologic environment. The network, which consists of 57 streamflow gaging stations and one lake-stage station in 39 States, is planned for permanent operation. This interim report describes streamflow characteristics at each bench-mark site and identifies time trends in annual streamflow that have occurred during the data-collection period. The streamflow characteristics presented for each streamflow station are (1) flood and low-flow frequencies, (2) flow duration, (3) annual mean flow, and (4) the serial correlation coefficient for annual mean discharge. In addition, Kendall's tau is computed as an indicator of time trend in annual discharges. The period of record for most stations was 13 to 17 years, although several stations had longer periods of record. The longest period was 65 years for Merced River near Yosemite, Calif. Records of flow at 6 of 57 streamflow sites in the network showed a statistically significant change in annual mean discharge over the period of record, based on computations of Kendall's tau. The values of Kendall's tau ranged from -0.533 to 0.648. An examination of climatological records showed that changes in precipitation were most likely the cause for the change in annual mean discharge.

  5. Hydrate research activities that both support and derive from the monitoring station/sea-floor Observatory, Mississippi Canyon 118, northern Gulf of Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Lutken, Carol [Univ. of Mississippi, Oxford, MS (United States). Center for Marine Resources and Environmental Technology (CMRET)

    2013-07-31

    A permanent observatory has been installed on the seafloor at Federal Lease Block, Mississippi Canyon 118 (MC118), northern Gulf of Mexico. Researched and designed by the Gulf of Mexico Hydrates Research Consortium (GOM-HRC) with the geological, geophysical, geochemical and biological characterization of in situ gas hydrates systems as the research goal, the site has been designated by the Bureau of Ocean Energy Management as a permanent Research Reserve where studies of hydrates and related ocean systems may take place continuously and cooperatively into the foreseeable future. The predominant seafloor feature at MC118 is a carbonate-hydrate complex, officially named Woolsey Mound for the founder of both the GOM-HRC and the concept of the permanent seafloor hydrates research facility, the late James Robert “Bob” Woolsey. As primary investigator of the overall project until his death in mid-2008, Woolsey provided key scientific input and served as chief administrator for the Monitoring Station/ Seafloor Observatory (MS-SFO). This final technical report presents highlights of research and accomplishments to date. Although not all projects reached the status originally envisioned, they are all either complete or positioned for completion at the earliest opportunity. All Department of Energy funds have been exhausted in this effort but, in addition, leveraged to great advantage with additional federal input to the project and matched efforts and resources. This report contains final reports on all subcontracts issued by the University of Mississippi, Administrators of the project, Hydrate research activities that both support and derive from the monitoring station/sea-floor Observatory, Mississippi Canyon 118, northern Gulf of Mexico, as well as status reports on the major components of the project. All subcontractors have fulfilled their primary obligations. Without continued funds designated for further project development, the Monitoring Station

  6. Retrieving 4-dimensional atmospheric boundary layer structure from surface observations and profiles over a single station

    Energy Technology Data Exchange (ETDEWEB)

    Pu, Zhaoxia [Univ. of Utah, Salt Lake City, UT (United States)

    2015-10-06

    Most routine measurements from climate study facilities, such as the Department of Energy’s ARM SGP site, come from individual sites over a long period of time. While single-station data are very useful for many studies, it is challenging to obtain 3-dimensional spatial structures of atmospheric boundary layers that include prominent signatures of deep convection from these data. The principal objective of this project is to create realistic estimates of high-resolution (~ 1km × 1km horizontal grids) atmospheric boundary layer structure and the characteristics of precipitating convection. These characteristics include updraft and downdraft cumulus mass fluxes and cold pool properties over a region the size of a GCM grid column from analyses that assimilate surface mesonet observations of wind, temperature, and water vapor mixing ratio and available profiling data from single or multiple surface stations. The ultimate goal of the project is to enhance our understanding of the properties of mesoscale convective systems and also to improve their representation in analysis and numerical simulations. During the proposed period (09/15/2011–09/14/2014) and the no-cost extension period (09/15/2014–09/14/2015), significant accomplishments have been achieved relating to the stated goals. Efforts have been extended to various research and applications. Results have been published in professional journals and presented in related science team meetings and conferences. These are summarized in the report.

  7. Upgrade and extension of the climate station at DTU Byg

    DEFF Research Database (Denmark)

    Andersen, Elsa; Dragsted, Janne; Kristensen, Troels V.

    In the period 2013-2014 the project “Upgrade and Extension of the Climate Station at DTU Byg” is carried out at DTU Byg. The aim of the project is to renew the hardware and the software for data acquisition and monitoring, exchange cables and cable connections in order to avoid interference...... of electrical noise from the surroundings and exchange worn out equipment. Further, the aim is to make measured data from the climate station easily available for the users....

  8. Weldon Spring Site Remedial Action Project quarterly environmental data summary (QEDS) for fourth quarter 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    This report contains the Quarterly Environmental Data Summary (QEDS) for the fourth quarter of 1998 in support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement. The data, except for air monitoring data and site KPA generated data (uranium analyses) were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the fourth quarter of 1998. KPA results for on-site total uranium analyses performed during fourth quarter 1998 are included. Air monitoring data presented are the most recent complete sets of quarterly data.

  9. Impacts on particles and ozone by transport processes recorded at urban and high-altitude monitoring stations

    Energy Technology Data Exchange (ETDEWEB)

    Nicolás, J.F., E-mail: j.nicolas@umh.es [Laboratory of Atmospheric Pollution (LCA), Miguel Hernández University, Av. de la Universidad s/n, Edif. Alcudia, 03202 Elche (Spain); Crespo, J.; Yubero, E.; Soler, R. [Laboratory of Atmospheric Pollution (LCA), Miguel Hernández University, Av. de la Universidad s/n, Edif. Alcudia, 03202 Elche (Spain); Carratalá, A. [Department of Chemical Engineering, University of Alicante, P.O. Box 99, 03080 Alicante (Spain); Mantilla, E. [Instituto Universitario CEAM-UMH, Parque Tecnológico, C/Charles R. Darwin 14, E-46980 Paterna (Spain)

    2014-01-01

    In order to evaluate the influence of particle transport episodes on particle number concentration temporal trends at both urban and high-altitude (Aitana peak-1558 m a.s.l.) stations, a simultaneous sampling campaign from October 2011 to September 2012 was performed. The monitoring stations are located in southeastern Spain, close to the Mediterranean coast. The annual average value of particle concentration obtained in the larger accumulation mode (size range 0.25–1 μm) at the mountain site, 55.0 ± 3.0 cm{sup − 3}, was practically half that of the value obtained at the urban station (112.0 ± 4.0 cm{sup − 3}). The largest difference between both stations was recorded during December 2011 and January 2012, when particles at the mountain station registered the lowest values. It was observed that during urban stagnant episodes, particle transport from urban sites to the mountain station could take place under specific atmospheric conditions. During these transports, the major particle transfer is produced in the 0.5–2 μm size range. The minimum difference between stations was recorded in summer, particularly in July 2012, which is most likely due to several particle transport events that affected only the mountain station. The particle concentration in the coarse mode was very similar at both monitoring sites, with the biggest difference being recorded during the summer months, 0.4 ± 0.1 cm{sup − 3} at the urban site and 0.9 ± 0.1 cm{sup − 3} at the Aitana peak in August 2012. Saharan dust outbreaks were the main factor responsible for these values during summer time. The regional station was affected more by these outbreaks, recording values of > 4.0 cm{sup − 3}, than the urban site. This long-range particle transport from the Sahara desert also had an effect upon O{sub 3} levels measured at the mountain station. During periods affected by Saharan dust outbreaks, ozone levels underwent a significant decrease (3–17%) with respect to its mean

  10. Advantages of active love wave techniques in geophysical characterizations of seismographic station - Case studies in California and the central and eastern United States

    Science.gov (United States)

    Martin, Antony; Yong, Alan K.; Salomone, Larry A.

    2014-01-01

    Active-source Love waves, recorded by the multi-channel analysis of surface wave (MASLW) technique, were recently analyzed in two site characterization projects. Between 2010 and 2012, the 2009 American Recovery and Reinvestment Act (ARRA) funded GEOVision to conduct geophysical investigations at 191 seismographic stations in California and the Central Eastern U.S. (CEUS). The original project plan was to utilize active and passive Rayleigh wave-based techniques to obtain shear-wave velocity (VS) profiles to a minimum depth of 30 m and the time-averaged VS of the upper 30 meters (VS30). Early in this investigation it became clear that Rayleigh wave techniques, such as multi-channel analysis of surface waves (MASRW), were not suited for characterizing all sites. Shear-wave seismic refraction and MASLW techniques were therefore applied. In 2012, the Electric Power Research Institute funded characterization of 33 CEUS station sites. Based on experience from the ARRA investigation, both MASRW and MASLW data were acquired by GEOVision at 24 CEUS sites. At shallow rock sites, sites with steep velocity gradients, and, sites with a thin, low velocity, surficial soil layer overlying stiffer sediments, Love wave techniques generally were found to be easier to interpret, i.e., Love wave data typically yielded unambiguous fundamental mode dispersion curves and thus, reduce uncertainty in the resultant VS model. These types of velocity structure often excite dominant higher modes in Rayleigh wave data, but not in the Love wave data. It is possible to model Rayleigh wave data using multi- or effective-mode techniques; however, extraction of Rayleigh wave dispersion data was found to be difficult in many cases. These results imply that field procedures should include careful scrutiny of Rayleigh wave-based dispersion data in order to also collect Love wave data when warranted.

  11. A comparative study of radiofrequency emission from roof top mobile phone base station antennas and tower mobile phone base antennas located at some selected cell sites in Accra, Ghana

    International Nuclear Information System (INIS)

    Atakpa, K. G.

    2014-07-01

    RF radiation exposure from antennas mounted on rooftop mobile phone base stations have become a serious issue in recent years due to the rapidly developing technologies in wireless telecommunication. The heightening numbers of base station and their closeness to the general public has led to possible health concerns as a result of exposure to RF radiations. The primary objective of this study was to assess the level of RF radiation emitted from roof top mobile phone base station antennas and compare the measured results with the guidelines set by International Commission on Non-ionization Radiation. The maximum and minimum average power density measured from the rooftop sites inside buildings were 2.46xI0 -2 and 1.68x10 -3 W/m 2 respectively whereas that for outside buildings at the same rooftop site was also 7.44x 10 -5 and 3.35x 10 -3 W/m 2 respectively. Public exposure quotient also ranged between 3.74x10 -10 to 1.31x10 -07 inside buildings whilst that for outside varied between 7.44x 10 -10 to 1.65x 10 -06 . Occupational exposure quotient inside buildings varied between 1.66x 10 -11 to 2.11 x 10 -09 whereas that for outside ranged from 3.31x10 -09 to 3.30x10 -07 all at the rooftop site. The results obtained for a typical tower base station also indicated that the maximum and minimum average power density was 4.57x10 -1 W/m 2 and 7.13x10 -3 W/m 2 respectively. The public exposure quotient varied between 1.58x10 -09 to 1.01x10 -07 whilst that for occupational exposure quotient ranged between 3.17x10 -10 to 2.03x10 -08 . The values of power densities levels inside buildings at rooftop sites are low compared to that of tower sites. This could be due to high attenuation caused by thick concrete walls and ceilings. The results obtained were found to be in compliance with ICNIRP and FCC guidance levels of 4.5 W/m 2 and 6 W/m 2 respectively. (au)

  12. Siting of nuclear power stations and the scope of preoperational investigations with special considerations of demographic aspects and the economic utilization of the neighbouring areas. [Poland

    Energy Technology Data Exchange (ETDEWEB)

    Bijak, J [Biuro Studiow i Projektow ' Energoprojekt' , Warsaw (Poland)

    1976-01-01

    Studies are presented on the location of atomic power stations in Poland. The methods used in the studies are described which were done in two stages: preliminary location studies on the macroregional scale, and location studies on one or more of the chosen locations. Part one deals with general conditions which have to be met for location of atomic power stations and with preliminary assumptions accepted by GBS i PE ''Energoprojekt'' for location studies. Regulations and recommendations for establishing sites for atomic power stations are also given. Special location conditions are dealt with more extensively, the enviromental hazards and the need for their studies being particularly emphasized. Part two describes the scope of studies made prior to and after the time location investigations. Demographic studies and the economic utilization of the neighbouring areas are presented in more detail.

  13. Draft environmental statement related to the operation of Hope Creek Generating Station (Docket No. 50-354)

    International Nuclear Information System (INIS)

    Wagner, D.H.

    1984-06-01

    This report contains an assessment of the environmental impact associated with the operation of the Hope Creek Generating Station pursuant to the National Environment Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environmental impacts, environmental consequences and mitigating actions, and environmental and economic benefits and costs associated with station operation. Land use and terrestrial and aquatic ecological impacts will be small. No operational impacts to historic and archeological sites are anticipated. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. Socioeconomic impacts of the project are anticipated to be minimal. The action called for is the issuance of an operating license for Hope Creek Generating Station, Unit 1

  14. Hydrogeology of Melton Valley determined from hydraulic head measuring station data

    International Nuclear Information System (INIS)

    Dreier, R.B.; Toran, L.E.

    1989-06-01

    The hydraulic head measuring stations (HHMSs) are well clusters that provide data required for evaluating both the transition between shallow and deep groundwater system(s) and the nature of the deep system(s). This information can be used to aid the characterization of the local hydrologic framework as dictated by state and federal regulatory agencies. Specifically this project provides a means for defining the lower boundary of the uppermost aquifer and for identifying potential pathways for off-site contaminant migration for shallow, intermediate, and deep groundwater flow. In addition, this project provides some of the geologic and hydrologic background information required to perform a risk assessment for individual waste sites. The objectives of the HHMS general plant projects are threefold: (1) to characterize potentiometric head levels in and near waste management areas in Melton Valley, (2) to characterize the geology in Melton Valley, and (3) to determine groundwater quality at their respective locations. This report presents results of data collected from wells constructed in FY 1986 and FY 1988. To meet these objectives, each HHMS was designed to consist of three telescoping wells, approximately 25 ft apart. The deepest well was drilled to approximately 400 ft, and the intermediate and shallow wells are approximately 200 and 80 ft deep, respectively. The open interval extends at least 20 ft below the bottom of the cased section of each well. 25 refs., 25 figs., 8 tabs

  15. National Biomedical Tracer Facility: Project definition study

    International Nuclear Information System (INIS)

    Heaton, R.; Peterson, E.; Smith, P.

    1995-01-01

    The Los Alamos National Laboratory is an ideal institution and New Mexico is an ideal location for siting the National Biomedical Tracer Facility (NBTF). The essence of the Los Alamos proposal is the development of two complementary irradiation facilities that combined with our existing radiochemical processing hot cell facilities and waste handling and disposal facilities provide a low cost alternative to other proposals that seek to satisfy the objectives of the NBTF. We propose the construction of a 30 MeV cyclotron facility at the site of the radiochemical facilities, and the construction of a 100 MeV target station at LAMPF to satisfy the requirements and objectives of the NBTF. We do not require any modifications to our existing radiochemical processing hot cell facilities or our waste treatment and disposal facilities to accomplish the objectives of the NBTF. The total capital cost for the facility defined by the project definition study is $15.2 M. This cost estimate includes $9.9 M for the cyclotron and associated facility, $2.0 M for the 100 MeV target station at LAMPF, and $3.3 M for design

  16. National Biomedical Tracer Facility: Project definition study

    Energy Technology Data Exchange (ETDEWEB)

    Heaton, R.; Peterson, E. [Los Alamos National Lab., NM (United States); Smith, P. [Smith (P.A.) Concepts and Designs (United States)

    1995-05-31

    The Los Alamos National Laboratory is an ideal institution and New Mexico is an ideal location for siting the National Biomedical Tracer Facility (NBTF). The essence of the Los Alamos proposal is the development of two complementary irradiation facilities that combined with our existing radiochemical processing hot cell facilities and waste handling and disposal facilities provide a low cost alternative to other proposals that seek to satisfy the objectives of the NBTF. We propose the construction of a 30 MeV cyclotron facility at the site of the radiochemical facilities, and the construction of a 100 MeV target station at LAMPF to satisfy the requirements and objectives of the NBTF. We do not require any modifications to our existing radiochemical processing hot cell facilities or our waste treatment and disposal facilities to accomplish the objectives of the NBTF. The total capital cost for the facility defined by the project definition study is $15.2 M. This cost estimate includes $9.9 M for the cyclotron and associated facility, $2.0 M for the 100 MeV target station at LAMPF, and $3.3 M for design.

  17. NASA Space Geodesy Program: GSFC data analysis, 1992. Crustal Dynamics Project VLBI geodetic results, 1979 - 1991

    Science.gov (United States)

    Ryan, J. W.; Ma, C.; Caprette, D. S.

    1993-01-01

    The Goddard VLBI group reports the results of analyzing 1648 Mark 3 data sets acquired from fixed and mobile observing sites through the end of 1991, and available to the Crustal Dynamics Project. Two large solutions were used to obtain Earth rotation parameters, nutation offsets, radio source positions, site positions, site velocities, and baseline evolution. Site positions are tabulated on a yearly basis for 1979 to 1995, inclusive. Site velocities are presented in both geocentric Cartesian and topocentric coordinates. Baseline evolution is plotted for 200 baselines, and individual length determinations are presented for an additional 356 baselines. This report includes 155 quasar radio sources, 96 fixed stations and mobile sites, and 556 baselines.

  18. An Introduction to the Tibet cGPS pilot project: TigiCAS

    Science.gov (United States)

    Zhang, Z.; Liu, J.; Galetzka, J.; Avouac, J.; Tapponnier, P.; Zeng, L.; Gan, W.; Shen, Z.; Wang, M.

    2007-12-01

    The convergence between India and Eurasia is the¡¡prototype of continental collision in action. Compared¡¡to geological history and fault kinematics studies, the present-day, regional pattern of strain-partitioning¡¡is still inadequately known. Among limited geodetic¡¡efforts in the past decade or two, most have been focused¡¡on refining measurements of the current crustal¡¡shortening rate across the Himalaya. The vast region¡¡immediately to the north is sparsely instrumented, with only one continuous GPS station (Lhasa) within¡¡the plateau proper. Campaign stations are few and¡¡ill-positioned, mostly along major roads, providing¡¡poor constraints on present-day slip-rates on individual¡¡active faults. The extant GPS network configuration is thus still insufficient to discriminate between block vs continuum deformation. In November 2006, the¡¡Chinese Academy of Sciences led a pilot program and¡¡installed 6 continuous GPS stations in southern Tibet, crossing the NS-trending normal fault systems and¡¡complementing the Nepal cGPS profiles. We present¡¡here the new sites, preliminary data processing results, and the spatial relationship with ongoing or planned¡¡continuous GPS sites from a couple of other projects. Together with such projects, TigiCAS will provide¡¡a substantial increase in geodetic data in the¡¡Himalayan-Tibet convergent belt in the next few¡¡years, and lead to a better understanding of¡¡contemporary deformation of the region.

  19. Closure report for CAU No. 450: Historical UST release sites, Nevada Test Site. Volume 2

    International Nuclear Information System (INIS)

    1997-09-01

    This report addresses the closure of 11 historical underground storage tank release sites within various areas of the Nevada Test Site. This report contains remedial verification of the soil sample analytical results for the following: Area 11 Tweezer facility; Area 12 boiler house; Area 12 service station; Area 23 bypass yard; Area 23 service station; Area 25 power house; Area 25 tech. services building; Area 25 tech. operations building; Area 26 power house; and Area 27 boiler house

  20. A remote characterization system for subsurface mapping of buried waste sites

    International Nuclear Information System (INIS)

    Sandness, G.A.; Bennett, D.W.

    1992-10-01

    Mapping of buried objects and regions of chemical and radiological contamination is required at US Department of Energy (DOE) buried waste sites. The DOE Office of Technology Development Robotics Integrated Program has initiated a project to develop and demonstrate a remotely controlled subsurface sensing system, called the Remote Characterization System (RCS). This project, a collaborative effort by five of the National Laboratories, involves the development of a unique low-signature survey vehicle, a base station, radio telemetry data links, satellite-based vehicle tracking, stereo vision, and sensors for non-invasive inspection of the surface and subsurface. To minimize interference with on-board sensors, the survey vehicle has been constructed predominatantly of non-metallic materials. The vehicle is self-propelled and will be guided by an operator located at a remote base station. The RCS sensors will be environmentally sealed and internally cooled to preclude contamination during use. Ground-penetrating radar, magnetometers, and conductivity devices are planned for geophysical surveys. Chemical and radiological sensors will be provided to locate hot spots and to provide isotopic concentration data

  1. Environmental impact assessment for nuclear and coal-fired power stations in Czechoslovakia

    International Nuclear Information System (INIS)

    Lapcik, V.

    1994-01-01

    Czechoslovakia has had legislation requiring environmental impact assessment since 1992. A methodology for complex evaluation of areas with thermal and nuclear energy sources, as related to ecology and environment, was developed by the staff of the Department of Ecology in accordance with the environmental Protection act (No. 17/1992) for use by the Czech Energy Company (Prague). This methodology will serve as a handbook of environmental impact assessment for the energy industry. Chapter 1 of the handbook describes the project, including information on the site, design, and size of the thermal or nuclear power station. Chapter 2 includes the data necessary to identify and assess the main effects that the project is likely to have on the environment. Chapter 3 describes aspects of the environment likely to be affected significantly by a proposed project, including population, fauna, flora, soil, water, air, climatic factors, material assets (such as architectural and archeological heritage), landscape, and the interrelationship between the above factors. Chapter 4 summarizes the measures envisaged to prevent, reduce, and where possible, offer any significant adverse effects on the environment

  2. Avian radioecology on a nuclear power station site. Technical progress report, 1 July 1974--30 June 1975

    International Nuclear Information System (INIS)

    Levy, C.K.

    1975-01-01

    The continuation of a program demonstrating that free-ranging wild birds can be used to assess environmental radionuclide levels is described. Wild passerine birds are trapped at a nuclear power station site and at two control sites, uniquely marked, non-destructively counted for levels of gamma-emitting radionuclides, and released. Subsequent recapture rates are as high as 80 percent for certain species. Nuclides detected included 40 K, 95 Zr- 95 Nb, 137 Cs, and apparent 131 I, the latter at levels just above detection limits (0.07 pCi/g). Significant variations in mean 137 Cs body burdens in Blue Jays and Bobwhite have been observed between sites less than 6 km apart. A significant temporal decrease in 137 Cs body burdens has been observed in various species of birds only at the reactor site. Vegetation and meteorological studies have been initiated to help explain these body-burden differences. The effective half-life of 137 Cs in the Blue Jay is 6.7 +- 1.5 days. The highest observed level of 95 Zr- 95 Nb (1.08 +- 0.07 pCi/g) was in a Grey Catbird. The effective half-life of the 95 Zr- 95 Nb was 69.9 +- 15 days, corresponding to the physical half-life of this isotope pair (65.5d), and the activity abruptly disappeared after the twelfth day of captivity suggesting that it was present in particulate form either on the feathers or skin, or in the bird's pulmonary system. Inter-laboratory comparisons of radionuclide measurements are reported. The number of birds banded during the current reporting period is 2720, while 2047 specimens were radioassayed, an increase of 9 percent and 313 percent, respectively. An exercise to test the practicality of obtaining avian samples from remote sites (i.e., > 50 miles away) for radionuclide measurement was performed satisfactorily. (U.S.)

  3. Yucca Mountain Site Characterization Project Waste Package Plan

    International Nuclear Information System (INIS)

    Harrison-Giesler, D.J.; Jardine, L.J.

    1991-02-01

    The goal of the US Department of Energy's (DOE) Yucca Mountain Site Characterization Project (YMP) waste package program is to develop, confirm the effectiveness of, and document a design for a waste package and associated engineered barrier system (EBS) for spent nuclear fuel and solidified high-level nuclear waste (HLW) that meets the applicable regulatory requirements for a geologic repository. The Waste Package Plan describes the waste package program and establishes the technical approach against which overall progress can be measured. It provides guidance for execution and describes the essential elements of the program, including the objectives, technical plan, and management approach. The plan covers the time period up to the submission of a repository license application to the US Nuclear Regulatory Commission (NRC). 1 fig

  4. On Chinese National Continuous Operating Reference Station System of GNSS

    Directory of Open Access Journals (Sweden)

    CHEN Junyong

    2007-11-01

    Full Text Available Objective: Global navigation satellite system (GNSS Continuous Operating Reference Station (CORS System can maintain a accurate, 3D, geocentric and dynamic reference coordinate frame in the corresponding area, can provide positioning and navigation service. It can also serve for the meteorology, geodynamics, earthquake monitoring and Location Based services (LBS etc in the same area. Until now, our country can’t provide a facing National CORS System serving for every profession and trade, and the national sharing platform of CORS System resources has not been established. So this paper discusses some valuable insight how to construct the National CORS System in China. Method: Constructing goal、Service object、CORS distribution、CORS geographic、geology and communication environment and other factors, are major considerations for the Constructing the National CORS System. Moreover, constructing GNSS CORS is more specific, mainly from four aspects, namely site-selection、civil construction、security measures and equipment-selection for consideration. Outcome: The project of the Constructing Global navigation satellite system (GNSS Continuous Operating Reference Station (CORS System in china is put forward, and is discussed from goal、principle、project and other for construction. Some meaning thought how to construct the National CORS System is submitted Conclusion: The Global navigation satellite system (GNSS Continuous Operating Reference Station (CORS System in china is the lack of a unified planning and design in the national level. So far, the national CORS system serving all walks of life has not been provided, and the national sharing platform of CORS System resources has not been established The primary mission of the Global navigation satellite system (GNSS Continuous Operating Reference Station (CORS System in china is as follows: using data set of GNSS and receiving, transport, process, integration, transmit information and

  5. SUPPORT OF GULF OF MEXICO HYDRATE RESEARCH CONSORTIUM: ACTIVITIES TO SUPPORT ESTABLISHMENT OF A SEA FLOOR MONITORING STATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Paul Higley; J. Robert Woolsey; Ralph Goodman; Vernon Asper; Boris Mizaikoff; Angela Davis

    2005-08-01

    data logger, (G) Sufficient energy supply and normal functioning of the pressure compensated battery even following recharge after the first deployment, (H) Survival of the acoustic modem following both deployments though it was found to have developed a slow leak through the transducer following the second deployment due, presumably, to deployment in excess of 300m beyond its rating. (2) Progress on the Sea Floor Probe: (A) The Sea Floor Probe and its delivery system, the Multipurpose sled have been completed, (B) The probe has been modified to penetrate the <1m blanket of hemipelagic ooze at the water/sea floor interface to provide the necessary coupling of the accelerometer with the denser underlying sediments, (C) The MPS has been adapted to serve as an energy source for both p- and s-wave studies at the station as well as to deploy the horizontal line arrays and the SFP. (3) Progress on the Electromagnetic Bubble Detector and Counter: (A) Components for the prototype have been assembled, including a dedicated microcomputer to control power, readout and logging of the data, all at an acceptable speed, (B) The prototype has been constructed and preliminary data collected, (C) The construction of the field system is underway. (4) Progress on the Acoustic Systems for Monitoring Gas Hydrates: (A) Video recordings of bubbles emitted from a seep in Mississippi Canyon have been made from a submersible dive and the bubbles analyzed with respect to their size, number, and rise rate. These measurements have been used to determine the parameters to build the system capable of measuring gas escaping at the site of the monitoring station, (B) Laboratory tests performed using the project prototype have produced a conductivity data set that is being used to refine parameters of the field model. (5) Progress on the Mid-Infrared Sensor for Continuous Methane Monitoring: (A) Preliminary designs of mounting pieces for electrical components of ''sphereIR'' have

  6. Project managing your simulator DCS upgrade

    International Nuclear Information System (INIS)

    Carr, S.

    2006-01-01

    The intention of this paper is to provide helpful information and tips for the purchaser with regard to the project management of a DCS upgrade for an existing nuclear power station operator-training simulator. This paper was written shortly after STS Powergen completed two nuclear power station simulator DCS projects in the USA. Areas covered by this paper are: - Contractual documents and arrangements; - Licence and Escrow agreements; - Liquidated damages; - Project management; - Project schedules and resources; - Monitoring progress; - Defect reporting; - DCS automation code; - Access to proprietary information; - Tips for project meetings; - Testing; - Cultural issues; - Training

  7. Supplement to the site observational work plan for the UMTRA project site at Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1995-11-01

    The purpose of this document is to provide additional and more detailed information to supplement review of the site observational work plan (SOWP) (DOE, 1995) for the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site. This document includes a discussion of the average linear velocity of the ground water in the alluvium and a discussion of the ground water quality of the alluvium, weathered Mancos Shale, and the Tres Hermanos-C Member of the Mancos Shale. The data from a 1989 aquifer test were analyzed using the curve-matching software AQTESOLV and then compared with the original results. A hydrograph of the ground water elevations in monitoring wells screened in the alluvium is presented to show how the ground water elevations change with time. Stiff and Piper diagrams were created to describe the changes in ground water geochemistry in the alluvium/weathered Mancos Sahel unit, the Tres Hermanos-C Sandstone unit, the Tres Hermanos-B Sandstone unit, and the Dakota Sandstone. Background information on other related topics such as site history, cell construction, soil characteristics, and well construction are presented in the SOWP. A geologic cross section depicts the conceptual model of the hydrostratigraphy and ground water chemistry of the Ambrosia Lake site. Hydrogeologic information of each hydrostratigraphic unit is presented

  8. Adaptive downtilt for cellular base stations

    NARCIS (Netherlands)

    Mestrom, R.M.C.; Coenen, T.J.; Smolders, A.B.

    2012-01-01

    Efficiency, reconfigurability, and power consumption are paramount for future communication systems in applications such as cellular handsets, base stations and home networking systems. We present our work in the European PANAMA project which addresses the associated challenges. Our work focuses on

  9. Control of tracers, fluids, and materials for the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Kalia, H.N.

    1993-01-01

    This paper describes use and control of tracers, fluids, and materials (TFM) at the Yucca Mountain Site Characterization Project, Management of TFM is necessary to ensure that site characterization activity does not introduce TFM that may have impact on Yucca Mountain's ability to isolate high-level radioactive waste from the accessible environment. All participants must identify TFM used for testing and construction and have the TFM evaluated to ascertain any impact on waste isolation capabilities of the site or on adjacent tests. Two data bases are created to track TFM: a working data base managed by Los Alamos National Lab. and a permanent data base managed by EG ampersand G, which will contain information on actual TFM used

  10. Off-site source recovery project case study: disposal of high activity cobalt 60 sources at the Nevada test site 2008

    International Nuclear Information System (INIS)

    Cocina, Frank G.; Stewart, William C.; Wald-Hopkins, Mark; Hageman, John P.

    2009-01-01

    The Off-Site Source Recovery Project has been operating at Los Alamos National Laboratory since 1998 to address the U.S. Department of Energy responsibility for collection and management of orphaned or disused radioactive sealed sources which may represent a risk to public health and national security if not properly managed.

  11. Siting Study Framework and Survey Methodology for Marine and Hydrokinetic Energy Project in Offshore Southeast Florida

    Energy Technology Data Exchange (ETDEWEB)

    Vinick, Charles; Riccobono, Antonino, MS; Messing, Charles G., Ph.D.; Walker, Brian K., Ph.D.; Reed, John K., Ph.D.

    2012-02-28

    Dehlsen Associates, LLC was awarded a grant by the United States Department of Energy (DOE) Golden Field Office for a project titled 'Siting Study Framework and Survey Methodology for Marine and Hydrokinetic Energy Project in Offshore Southeast Florida,' corresponding to DOE Grant Award Number DE-EE0002655 resulting from DOE funding Opportunity Announcement Number DE-FOA-0000069 for Topic Area 2, and it is referred to herein as 'the project.' The purpose of the project was to enhance the certainty of the survey requirements and regulatory review processes for the purpose of reducing the time, efforts, and costs associated with initial siting efforts of marine and hydrokinetic energy conversion facilities that may be proposed in the Atlantic Ocean offshore Southeast Florida. To secure early input from agencies, protocols were developed for collecting baseline geophysical information and benthic habitat data that can be used by project developers and regulators to make decisions early in the process of determining project location (i.e., the siting process) that avoid or minimize adverse impacts to sensitive marine benthic habitat. It is presumed that such an approach will help facilitate the licensing process for hydrokinetic and other ocean renewable energy projects within the study area and will assist in clarifying the baseline environmental data requirements described in the U.S. Department of the Interior Bureau of Ocean Energy Management, Regulation and Enforcement (formerly Minerals Management Service) final regulations on offshore renewable energy (30 Code of Federal Regulations 285, published April 29, 2009). Because projects generally seek to avoid or minimize impacts to sensitive marine habitats, it was not the intent of this project to investigate areas that did not appear suitable for the siting of ocean renewable energy projects. Rather, a two-tiered approach was designed with the first step consisting of gaining overall insight

  12. Salt repository project site study plan for water resources: Revision 1

    International Nuclear Information System (INIS)

    1987-12-01

    The Site Study Plan for Water Resources describes a field program consisting of surface-water and ground-water characterization. The surface-water studies will determine the drainage basin characteristics (i.e., topography, soils, land use), hydrometeorology, runoff to streams and playas, and surface-water quality (i.e., offsite pollution sources in playa lakes and in streams). The environmental ground-water studies will focus on ground-water quality characterization. The site study plan describes for each study the need for the study, study design, data management and use, schedule of proposed activities, and quality assurance. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Projects Requirements Document. 78 refs., 8 figs., 5 tabs

  13. Gravitational biology on the space station

    Science.gov (United States)

    Keefe, J. R.; Krikorian, A. D.

    1983-01-01

    The current status of gravitational biology is summarized, future areas of required basic research in earth-based and spaceflight projects are presented, and potential applications of gravitational biology on a space station are demonstrated. Topics covered include vertebrate reproduction, prenatal/postnatal development, a review of plant space experiments, the facilities needed for growing plants, gravimorphogenesis, thigmomorphogenesis, centrifuges, maintaining a vivarium, tissue culture, and artificial human organ generation. It is proposed that space stations carrying out these types of long-term research be called the National Space Research Facility.

  14. Testing various modes of installation for permanent broadband stations in open field environment

    Science.gov (United States)

    Vergne, Jérôme; Charade, Olivier; Arnold, Benoît; Louis-Xavier, Thierry

    2014-05-01

    In the framework of the RESIF (Réseau Sismologique et géodésique Français) project, we plan to install more than one hundred new permanent broadband stations in metropolitan France within the next 6 years. Whenever possible, the sensors will be installed in natural or artificial underground cavities that provide a stable thermal environment. However such places do not exist everywhere and we expect that about half the future stations will have to be set up in open fields. For such sites, we are thus looking for a standard model of hosting infrastructure for the sensors that would be easily replicated and would provide good noise level performances at long periods. Since early 2013, we have been operating a prototype station at Clévilliers, a small location in the sedimentary Beauce plain, where we test three kinds of buried seismic vaults and a down-hole installation. The cylindrical seismic vaults are 3m deep and 1m wide and only differ by the type of coupling between the casing and the concrete slab where we installed insulated Trillium T120PA seismometers. The down-hole installation consists in a 3m deep well hosting a Trillium Posthole seismometer. For reference, another sensor has been installed in a ~50cm deep hole, similarly to the way we test every new potential site. Here we compare the noise level in each infrastructure at different frequencies. We observe quite similar performances for the vertical component recorded in the different wells. Conversely, the noise levels on the horizontal components at periods greater than 10s vary by more than 20dB depending on the installation condition. The best results are obtained in the completely decoupled vault and for the down-hole setting, both showing performances comparable to some of our permanent stations installed in tunnels. The amplitude of the horizontal noise also appears to be highly correlated to wind speed recorded on site, even at long periods. The variable response of each vault to such

  15. Technical data management at the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Statler, J.; Newbury, C.M.; Heitland, G.W.

    1992-01-01

    The Department of Energy/Office of Civilian Radioactive waste Management (DOE/OCRWM) is responsible for the characterization of Yucca Mountain, Nevada, to determine its potential as a site of a high-level radioactive waste repository. The characterization of Yucca Mountain encompasses many diverse investigations, both onsite and in laboratories across the country. Investigations are being conducted of the geology, hydrology, mineralogy, paleoclimate, geotechnical properties, and archeology of the area, to name a few. Effective program management requires that data from site investigations be processed, interpreted and disseminated in a timely manner to support model development and validation, repository design, and performance assessment. The Program must also meet regulatory requirements for making the technical data accessible to a variety of external users throughout the life of the Project. Finally, the DOE/OCRWM must make available the data or its description and access location available for use in support of the license application and supporting documentation. To accomplish these objectives, scientific and engineering data, generated by site characterization activities, and technical data, generated by environmental and socioeconomic impact assessment activities, must be systematically identified, cataloged, stored and disseminated in a controlled manner

  16. WindPACT Turbine Design Scaling Studies: Technical Area 4 - Balance-of-Station Cost; ANNUAL

    International Nuclear Information System (INIS)

    Shafer, D. A.; Strawmyer, K. R.; Conley, R. M.; Guidinger J. H.; Wilkie, D. C.; Zellman, T. F.

    2001-01-01

    DOE's Wind Partnerships for Advanced Component Technologies (WindPACT) program explores the most advanced wind-generating technologies for improving reliability and decreasing energy costs. The first step in the WindPact program is a scaling study to bound the optimum sizes for wind turbines, to define size limits for certain technologies, and to scale new technologies. The program is divided into four projects: Composite Blades for 80-120-meter Rotors; Turbine, Rotor, and Blade Logistics; Self-Erecting Tower and Nacelle Feasibility; and Balance-of-Station Cost. This report discusses balance-of-station costs, which includes the electrical power collector system, wind turbine foundations, communications and controls, meteorological equipment, access roadways, crane pads, and the maintenance building. The report is based on a conceptual 50-megawatt (MW) wind farm site near Mission, South Dakota. Cost comparisons are provided for four sizes of wind turbines: 750 kilowatt (kW), 2.5 MW, 5.0 MW, and 10.0 MW

  17. Ground-water monitoring compliance projects for Hanford Site facilities: Annual progress report for 1987

    International Nuclear Information System (INIS)

    Hall, S.H.

    1988-09-01

    This report describes progress during 1987 of five Hanford Site ground water monitoring projects. Four of these projects are being conducted according to regulations based on the federal Resource Conservation and Recovery Act of 1976 and the state Hazardous Waste Management Act. The fifth project is being conducted according to regulations based on the state Solid Waste Management Act. The five projects discussed herein are: 300 Area Process Trenches; 183-H Solar Evaporation Basins; 200 Areas Low-Level Burial Grounds; Nonradioactive Dangerous Waste Landfill; Solid Waste Landfill. For each of the projects, there are included, as applicable, discussions of monitoring well installations, water-table measurements, background and/or downgradient water quality and results of chemical analysis, and extent and rate of movement of contaminant plumes. 14 refs., 30 figs., 13 tabs

  18. Multi-site risk-based project planning, optimization, sequencing, & budgeting process and tool for the integrated facility disposition project

    International Nuclear Information System (INIS)

    Nelson, J.G.; Castillo, C.; Huntsman, J.; Killoy, S.; Lucek, H.; Marks, T.C.

    2011-01-01

    Faced with the Department of Energy (DOE) Complex Transformation, National Nuclear Security Administration (NNSA) was tasked with developing an integrated plan for the decommissioning of over 400 facilities and 300 environmental remediation units, as well as the many reconfiguration and modernization projects at the Oak Ridge National Laboratory (ORNL) and Y-12 Complex. Manual scheduling of remediation activities is time-consuming and inherently introduces bias of the scheduler or organization into the process. Clearly a well-defined process, quantitative risk-based tool was needed to develop an objective, unbiased baseline sequence and schedule with a sound technical foundation for the Integrated Facility Disposition Project (IFDP). Faced with limited available data, innovation was needed to extrapolate intelligent relative data for key risk parameters based on known data elements. The IFDP Supermodel was customized and expanded to provide this capability for conceptual planning of diverse project portfolios and multiple sites. (author)

  19. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1994 quality program status report

    International Nuclear Information System (INIS)

    Bolivar, S.L.

    1996-03-01

    This status report is for calendar year 1994. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, a baseline is established that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify adverse trends and to evaluate improvements. This is the fourth annual status report

  20. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1994 quality program status report

    Energy Technology Data Exchange (ETDEWEB)

    Bolivar, S.L.

    1996-03-01

    This status report is for calendar year 1994. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, a baseline is established that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify adverse trends and to evaluate improvements. This is the fourth annual status report.