WorldWideScience

Sample records for project site selection

  1. Site selection for controversial projects: reflections on the MRS experience

    International Nuclear Information System (INIS)

    Sigmon, E.B.; Marland, G.

    1987-01-01

    Projects for waste management, power production, and a host of other socially useful functions frequently falter because of local opposition. Students of the siting dilemma have prescribed accommodation of local interests through negotiation and compensation, but they offer little advice on the site selection itself. The negotiated compensation approach to siting frequently fails because localities refuse to negotiate. The authors argue that methods of site selection and developers' initial stance toward local communities affect communities' propensity to negotiate. Site selection strategies and their influence on project acceptability are examined, using the Department of Energy's Monitored Retrievable Storage proposal as a point of departure. 14 refs

  2. A Study on Site Selecting for National Project including High Level Radioactive Waste Disposal

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kilyoo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    Many national projects are stopped since sites for the projects are not determined. The sites selections are hold by NIMBY for unpleasant facilities or by PYMFY for preferable facilities among local governments. The followings are the typical ones; NIMBY projects: high level radioactive waste disposal, THAAD, Nuclear power plant(NPP), etc. PIMFY projects: South-east new airport, KTX station, Research center for NPP decommission, etc. The site selection for high level radioactive waste disposal is more difficult problem, and thus government did not decide and postpone to a dead end street. Since it seems that there is no solution for site selection for high level radioactive waste disposal due to NIMBY among local governments, a solution method is proposed in this paper. To decide a high level radioactive waste disposal, the first step is to invite a bid by suggesting a package deal including PIMFY projects such as Research Center for NPP decommission. Maybe potential host local governments are asked to submit sealed bids indicating the minimum compensation sum that they would accept the high level radioactive waste disposal site. If there are more than one local government put in a bid, then decide an adequate site by considering both the accumulated PESS point and technical evaluation results. By considering how fairly preferable national projects and unpleasant national projects are distributed among local government, sites selection for NIMBY or PIMFY facilities is suggested. For NIMBY national projects, risk, cost benefit analysis is useful and required since it generates cost value to be used in the PESS. For many cases, the suggested method may be not adequate. However, similar one should be prepared, and be basis to decide sites for NIMBY or PIMFY national projects.

  3. Nuclear site selection studies

    International Nuclear Information System (INIS)

    Gharib, A.; Zohoorian Izadpanah, A.A.; Iranmanesh, H.

    2000-01-01

    It is of special importance, especially from the nuclear safety viewpoint, to select suitable sites for different nuclear structures with the considered future activities. Site selection sometimes involves high costs not necessarily for merely selecting of site but for some preliminary measures to be taken so as the site may have the necessary characteristics. The more suitable the natural characteristics of the site for the considered project, the more successful and efficient the project, the lower the project costs and the longer the project operation period. If so, the project will cause the growth of public culture and sustainable socioeconomic development. This paper is the result of the conclusion of numerous massive reports of this activity in the preliminary phase based on theories, practices and the related safety principles on this ground as well as the application of data and information of the past and a glance to the future. The conception of need for a site for medium structures and nuclear research projects and how to perform this process are presented step by step here with a scientific approach to its selection during the investigations. In this study, it is practically described how the site is selected, by determining and defining the characteristics of research and nuclear projects with medium structures and also its fitting to the optimum site. The discovered sites typically involve the best advantages in technical and economic aspects and no particular contrast with the concerned structures

  4. DECISION SUPPORT CONCEPT TO MANAGEMENT OF CONSTRUCTION PROJECTS - PROBLEM OF CONSTRUCTION SITE SELECTION

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2013-02-01

    Full Text Available The aim of this paper is to present Decision Support Concept (DSC for management of construction projects. Focus of our research is in application of multicritera methods (MCM to decision making in planning phase of construction projects (related to the problem of construction sites selection. The problem is identified as a significant one from many different aspects such as economic aspect, civil engineering aspect, etc. what indicates the necessity for evaluation of multiple sites by several different criteria. Therefore, DSC for construction site selection based on PROMETHEE method is designed. In order to define the appropriate criteria, their weights and preference functions for the concept, three groups of stakeholders are involved (investors, construction experts and experts for real estate market in its design. AHP method has been used for determination of criteria weights. The model has been tested on the problem of site selection for construction of residential-commercial building in four largest cities in Croatia.

  5. Survey of siting practices for selected management projects in seven countries

    International Nuclear Information System (INIS)

    Hardin, E.; Aahagen, H.

    1992-06-01

    This paper surveys siting practices for deep geologic disposal in seven countries, and attempts to formulate generalizations which could be useful for the upcoming review of the Swedish plan for siting the SFL repository (R and D 92). Comparison of projects in different countries is done with full appreciation of the technical, legal, and cultural differences. The seven countries were selected for experience with siting in crystalline rock, similarity of siting practices to Sweden, and the availability of published information. Local governments have demonstrated effective veto power in each of the seven countries surveyed, although this power is exercised in different ways. This paper shows how the siting strategy itself affects the ability and the inclination of localities to block the project. It shows by example that public involvement, parallel vs. sequential characterization, schedule for siting activities, and the existence of interim waste storage capability have an impact on the success of siting. The focus of this paper is deep geologic disposal. Shallow land disposal and non-radioactive wastes are not discussed in detail, with three exceptions: LLW disposal siting in the U.S. and Canada, and the SAKAB incinerator projects in Sweden. These provide insight into siting approaches and demonstrate that conclusions regarding deep geologic disposal are supported by other experience. (114 refs.) (au)

  6. Nuclear Power Plant project site selection geotechnical considerations

    International Nuclear Information System (INIS)

    Katti, V.J.; Banerjee, D.C.

    1997-01-01

    During the selection of a site for Nuclear Power Plant (NPP) and Radioactive Waste Plant (RWP), geotechnical investigations play a significant role in deciding merits and demerits of the sites. Any accidents in these units can play havoc on mankind and may leave bitter imprints on generations to come. Hence proper care has to be taken at the early stage for selecting the sites. Site selection procedure is a complicated one, because it involves experts from various disciplines like geology, geophysics, civil, mechanical electrical engineering, health-physics and other fields

  7. Participation of concerned citizens in site selection decisions

    International Nuclear Information System (INIS)

    Appel, D.

    2003-01-01

    The contribution presents preliminary results of two international projects aimed at integrating the general public, or parts thereof, in the decision process of selecting ultimate storage sites. The author participated in these projects and is a former member of the task group for selection of ultimate storage sites (Arbeitskreis Auswahlverfahren Endlagerstandorte - AkEnd). The two projects are: Forum on Stakeholder Confidence (FSC) of the Nuclear Energy Agency (NEA) OECD, Project 'COWAM' (Community Waste Management) of the European Commission. The participants, goals and methods of the two projects were different, but they both presented concrete methods of selecting ultimate storage sites from the view of different actors in the form of case studies. The focus was on the participation of the public and its importance for success. Apart from meeting technical requirements the selection process should also take account of the requirements of democracy and citizens' participation in order to gain wide acceptance for its results. Deficiencies and advantages of the proposed selection processes are analyzed, and general requirements on the decision process in site selection are derived. (orig.) [de

  8. Review of selected 100-N waste sites related to N-Springs remediation projects

    International Nuclear Information System (INIS)

    DeFord, D.H.; Carpenter, R.W.

    1996-01-01

    This document has been prepared in support of the environmental restoration program at the US Department of Energy's Hanford Site near Richland, Washington, by the Bechtel Hanford, Inc. Facility and Waste Site Research Office. It provides historical information that documents and characterizes selected waste sites that are related to the N-Springs remediation projects. The N-Springs are a series of small, inconspicuous groundwater seepage springs located along the Columbia River shoreline near the 100-N Reactor. The spring site is hydrologically down-gradient from several 100-N Area liquid waste sites that are believed to have been the source(s) of the effluents being discharged by the springs. This report documents and characterizes these waste sites, including the 116-N-1 Crib and Trench, 116-N-3 Crib and Trench, unplanned releases, septic tariks, and a backwash pond

  9. Site selection

    International Nuclear Information System (INIS)

    Olsen, C.W.

    1983-07-01

    The conditions and criteria for selecting a site for a nuclear weapons test at the Nevada Test Site are summarized. Factors considered are: (1) scheduling of drill rigs, (2) scheduling of site preparation (dirt work, auger hole, surface casing, cementing), (3) schedule of event (when are drill hole data needed), (4) depth range of proposed W.P., (5) geologic structure (faults, Pz contact, etc.), (6) stratigraphy (alluvium, location of Grouse Canyon Tuff, etc.), (7) material properties (particularly montmorillonite and CO 2 content), (8) water table depth, (9) potential drilling problems (caving), (10) adjacent collapse craters and chimneys, (11) adjacent expended but uncollapsed sites, (12) adjacent post-shot or other small diameter holes, (13) adjacent stockpile emplacement holes, (14) adjacent planned events (including LANL), (15) projected needs of Test Program for various DOB's and operational separations, and (16) optimal use of NTS real estate

  10. Site specific information in site selection

    International Nuclear Information System (INIS)

    Aeikaes, T.; Hautojaervi, A.

    1998-01-01

    The programme for the siting of a deep repository for final disposal of spent nuclear fuel was started already in 1983 and is carried out today by Posiva Oy which continues the work started by Teollisuuden Voima Oy. The programme aims at site selection by the end of the year 2000. The programme has progressed in successive interim stages with defined goals. After an early phase for site identification, five sites were selected in 1987 for preliminary site characterisation. Three of these were selected and judged to be best suited for the more detailed characterisation in 1992. An additional new site was included into the programme based on a separate feasibility study in the beginning of 1997. Since the year 1983 several safety assessments together with technical plans of the facility have been completed. When approaching the site selection the needs for more detailed consideration of the site specific properties in the safety assessment have been increased. The Finnish regulator STUK has published a proposal for general safety requirements for the final disposal of spent nuclear fuel in Finland. This set of requirements has been projected to be used in conjunction of the decision making by the end 2000. Based on the site evaluation all sites can provide a stable environment and there is evidence that the requirements for the longevity of the canister can be fulfilled at each site. In this manner the four candidate sites do not differ too much from each other. The main difference between the sites is in the salinity of the deep groundwater. The significance of differences in the salinity for the long-term safety cannot be defined yet. The differences may contribute to the discussion of the longevity of the bentonite buffer and also to the modelling of the groundwater flow and transport. The use of the geosphere as a transport barrier is basically culminated on the questions about sparse but fast flow routes and 'how bad channeling can be'. To answer these questions

  11. Site observational work plan for the UMTRA Project Site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1996-03-01

    The U.S. Department of Energy (DOE) has prepared this initial site observational work plan (SOWP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This SOWP is one of the first UMTRA Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards (40 CFR Part 192, as amended by 60 FR 2854) for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement (PEIS). This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The DOE goal is to use the observational method to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation based on the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards

  12. Site observational work plan for the UMTRA Project site at Spook, Wyoming

    International Nuclear Information System (INIS)

    1995-05-01

    The Spook, Wyoming, site observational work plan proposes site-specific activities to achieve compliance with Subpart B of 40 CFR Part 192 (1994) of the final US Environmental Protection Agency (EPA) ground water protection standards 60 FR 2854 (1995) at this Uranium Mill Tailing Remedial Action (UMTRA) Project site. This draft SOWP presents a comprehensive summary of existing site characterization data, a conceptual site model of the nature and extent of ground water contamination, exposure pathways, and potential impact to human health and the environment. Section 2.0 describes the requirements for meeting ground water standards at UMTRA Project sites. Section 3.0 defines past and current conditions, describes potential environmental and human health risks, and provides site-specific data that supports the selection of a proposed ground water compliance strategy. Section 4.0 provides the justification for selecting the proposed ground water compliance strategy based on the framework defined in the ground water programmatic environmental impact statement (PEIS)

  13. Investigation of the site selection examples adopted local participation. The site selection processes in Belgium, UK and Switzerland

    International Nuclear Information System (INIS)

    Kageyama, Hitoshi; Suzuki, Shinji; Hirose, Ikuro; Yoshioka, Tatsuji

    2014-06-01

    In late years, local participation policies are being adopted in foreign countries at site selection for the disposal of the radioactive waste. We performed documents investigation about the examples of the site selection processes of Belgium, the U.K., and Switzerland to establish the site selection policy in Japan. In Belgium, after the failure of the site selection for the disposal of short-lived low and intermediate level radioactive waste (LILW) in an early stage, the idea of the local partnership (LP) was developed and three independent LPs were established between the implementing body and each municipality. About 7 years later, one site was decided as the disposal site in the cabinet meeting of the federal government. In the U.K., after the failure of the site selection for the rock characterization facility, the government policy was changed and the consultation process comprised of six phases was started. Though the process had been carried out for over 4 years since one combined partnership was established between the implementing body and the municipalities involved, they had to withdraw from the consulting process because a county council had not accepted that the process would step forward to the 4th phase. In Switzerland, the implementing body selected one site for LILW disposal at an early stage, but the project was denied by the referendum in the Canton having jurisdiction over the site area. After that the Federal Parliament established new Nuclear Energy Act and Nuclear Energy Ordinance precluding the veto of Canton. Now the site selection project is being carried out according to the process comprised of three phases with local participation policy. Reviewing the merits and demerits of each example through this investigation, we confirmed if we are to adopt local participation policy in our country in future, further prudent study would be necessary, considering current and future social conditions in Japan. (author)

  14. Seismic safety margins research program. Phase I final report - Plant/site selection and data collection (Project I)

    International Nuclear Information System (INIS)

    Chuang, T.Y.

    1981-07-01

    Project I of Phase I of the Seismic Safety Margins Research Program (SSMRP) comprised two parts: the selection of a representative nuclear power plant/site for study in Phase I and the collection of data needed by the other SSMRP projects. Unit 1 of the Zion Nuclear Power Plant in Zion, Illinois, was selected for the SSMRP Phase I studies. Unit 1 of the Zion plant has been validated as a good choice for the Phase I study plant. Although no single nuclear power plant can represent all such plants equally well, selection criteria were developed to maximize the generic implications of Phase I of the SSMRP. On the basis of the selection criteria, the Zion plant and its site were found to be reasonably representative of operating and future plants with regard to its nuclear steam supply system; the type of containment structure (prestressed concrete); its electrical capacity (1100 MWe); its location (the Midwest); the peak seismic acceleration used for design (0.17g); and the properties of the underlying soil (the low-strain shear-wave velocity is 1650 ft/s in a 50- to 100-ft-thick layer of soil overlying sedimentary bedrock). (author)

  15. Turbidity monitoring at select MDOT construction sites.

    Science.gov (United States)

    2012-06-01

    The objective of this project was to establish baseline turbidity conditions at select construction : sites by establishing a water quality monitoring program and documenting MDOT approved : BMPs on site. In 2009 the United States Environmental Prote...

  16. Site Selection for Surplus Plutonium Disposition Facilities at the Savannah River Site

    International Nuclear Information System (INIS)

    Wike, L.D.

    2000-01-01

    A site selection study was conducted to evaluate locations for the proposed Surplus Plutonium Disposition Facilities. Facilities to be located include the Mixed Oxide (MOX) Fuel Fabrication Facility, the Pit Disassembly and Conversion Facility (PDCF), and the Plutonium Immobilization Project (PIP) facility. Objectives of the study include: (1) Confirm that the Department of Energy (DOE) selected locations for the MOX and PDCF were suitable based on selected siting criteria, (2) Recommend a site in the vicinity of F Area that is suitable for the PIP, and (3) Identify alternative suitable sites for one or more of these facilities in the event that further geotechnical characterization or other considerations result in disqualification of a currently proposed site

  17. 32 CFR 644.22 - Site selection.

    Science.gov (United States)

    2010-07-01

    ... and site boards should be informed of any available lands, including marginal lands in civil works... HANDBOOK Project Planning Military (army and Air Force) and Other Federal Agencies § 644.22 Site selection... Engineer to prepare a Real Estate Planning Report or Real Estate Summary, making reference to the prior...

  18. Site identification presentation: Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    1979-11-01

    The final step in the site identification process for the Basalt Waste Isolation Project is described. The candidate sites are identified. The site identification methodology is presented. The general objectives which must be met in selecting the final site are listed. Considerations used in the screening process are also listed. Summary tables of the guidelines used are included

  19. Site selection for new nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Rizzo, Paul C.; Dubinsky, Melissa; Tastan, Erdem Onur, E-mail: paul.rizzo@rizzoassoc.com, E-mail: melissa.dubinsky@rizzoassoc.com, E-mail: onur.tastan@rizzoassoc.com [RIZZO Associates Inc., Pittsburgh, PA (United States); Miano, Sandra C., E-mail: scm27@psu.edu [Eletrobras Termonuclear S.A. (ELETRONUCLEAR), RJ (Brazil); Pennsylvania State University, Department of Mechanical and Nuclear Engineering, State College, PA (United States)

    2015-07-01

    The current methodology for selecting the most advantageous site(s) for nuclear power plant (NPP) development is based on the latest evolution of protocols originally established in the 1990's by the Electric Power Research Institute (EPRI) and others for programs in the USA, and more recently by the International Atomic Energy Agency (IAEA), among others. The methodology includes protocols that account for lessons learned from both the Gen III projects and the catastrophic event at Fukushima, Japan. In general, the approach requires consideration of Exclusionary or 'fatal flaw' Criteria first, based on safety as well as significant impact to the environment or human health. Sites must meet all of these Exclusionary Criteria to be considered for NPP development. Next, the remaining sites are evaluated for Avoidance Criteria that affect primarily ease of construction and operations, which allow a ranking of sites best suited for NPP development. Finally, Suitability Criteria are applied to the potential sites to better differentiate between closely ranked sites. Generally, final selection of a Preferred and an Alternate Site will require balancing of factors, expert judgment, and client input, as sites being compared will differ in their scores associated with different Avoidance Criteria and Suitability Criteria. RIZZO Associates (RIZZO) offers in this paper a modification to this methodology for selecting the site for NPP development, which accords to the categories of Exclusionary, Avoidance and Suitability Criteria strict definitions which can be considered as Absolute Factors, Critical Factors, and Economic Factors for a more focused approach to site selection. Absolute Factors include all of the safety-related Exclusionary Criteria. Critical Factors are those that are difficult to overcome unless extraordinary mitigation measures are implemented; they have a significant impact on the ability of the project to be successful and may cause the

  20. Site selection for new nuclear power plants

    International Nuclear Information System (INIS)

    Rizzo, Paul C.; Dubinsky, Melissa; Tastan, Erdem Onur; Miano, Sandra C.

    2015-01-01

    The current methodology for selecting the most advantageous site(s) for nuclear power plant (NPP) development is based on the latest evolution of protocols originally established in the 1990's by the Electric Power Research Institute (EPRI) and others for programs in the USA, and more recently by the International Atomic Energy Agency (IAEA), among others. The methodology includes protocols that account for lessons learned from both the Gen III projects and the catastrophic event at Fukushima, Japan. In general, the approach requires consideration of Exclusionary or 'fatal flaw' Criteria first, based on safety as well as significant impact to the environment or human health. Sites must meet all of these Exclusionary Criteria to be considered for NPP development. Next, the remaining sites are evaluated for Avoidance Criteria that affect primarily ease of construction and operations, which allow a ranking of sites best suited for NPP development. Finally, Suitability Criteria are applied to the potential sites to better differentiate between closely ranked sites. Generally, final selection of a Preferred and an Alternate Site will require balancing of factors, expert judgment, and client input, as sites being compared will differ in their scores associated with different Avoidance Criteria and Suitability Criteria. RIZZO Associates (RIZZO) offers in this paper a modification to this methodology for selecting the site for NPP development, which accords to the categories of Exclusionary, Avoidance and Suitability Criteria strict definitions which can be considered as Absolute Factors, Critical Factors, and Economic Factors for a more focused approach to site selection. Absolute Factors include all of the safety-related Exclusionary Criteria. Critical Factors are those that are difficult to overcome unless extraordinary mitigation measures are implemented; they have a significant impact on the ability of the project to be successful and may cause the

  1. Site observational work plan for the UMTRA project site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1996-01-01

    This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer

  2. A new approach to the LILW repository site selection

    International Nuclear Information System (INIS)

    Mele, I.; Zeleznik, N.

    1998-01-01

    After the failure of site selection, which was performed between 1990-1993, the Agency for Radwaste Management was urged to start a new site selection process for low and intermediate level waste (LILW). Since this is the most sensitive and delicate phase of the whole disposal project extensive analyses of foreign and domestic experiences in siting were performed. Three different models were studied and discussed at a workshop on preparation of the siting procedure for LILW repository. The participants invited to the workshop supported the combined approach, to the site selection, which is presented in this paper.(author)

  3. Site selection criteria for shallow land burial of low-level radioactive waste

    International Nuclear Information System (INIS)

    Falconer, K.L.; Hull, L.C.; Mizell, S.A.

    1982-01-01

    Twelve site selection criteria are presented. These are: (1) site shall be of sufficient area and depth to accommodate the projected volume of waste and a three dimensional buffer zone; (2) site should allow waste to be buried either completely above or below the transition zone between the unsaturated and saturated zones; (3) site should be located where flooding will not jeopardize performance; (4) site should be located where erosion will not jeopardize performance; (5) site should be located in areas where hydrogeologic conditions allow reliable performance prediction; (6) site should be located where geologic hazards will not jeopardize performance; (7) site should be selected with considerations given to those characteristics of earth materials and water chemistry that favor increased residence times and/or attenuation of radionuclide concentrations within site boundaries; (8) site should be selected with consideration given to current and projected population distributions; (9) site should be selected with consideration given to current and projected land use and resource development; (10) site should be selected with consideration given to location of waste generation, access to all-weather highway and rail routes, and access utilities; (11) site should be selected consistent with federal laws and regulations; (12) site should not be located within areas that are protected from such use by federal laws and regulations. These criteria are considered preliminary and do not necessarily represent the position of the Department of Energy's Low-Level Waste Management Program

  4. Summary of computational support and general documentation for computer code (GENTREE) used in Office of Nuclear Waste Isolation Pilot Salt Site Selection Project

    International Nuclear Information System (INIS)

    Beatty, J.A.; Younker, J.L.; Rousseau, W.F.; Elayat, H.A.

    1983-01-01

    A Decision Tree Computer Model was adapted for the purposes of a Pilot Salt Site Selection Project conducted by the Office of Nuclear Waste Isolation (ONWI). A deterministic computer model was developed to structure the site selection problem with submodels reflecting the five major outcome categories (Cost, Safety, Delay, Environment, Community Impact) to be evaluated in the decision process. Time-saving modifications were made in the tree code as part of the effort. In addition, format changes allowed retention of information items which are valuable in directing future research and in isolation of key variabilities in the Site Selection Decision Model. The deterministic code was linked to the modified tree code and the entire program was transferred to the ONWI-VAX computer for future use by the ONWI project

  5. Umatilla Satellite and Release Sites Project : Final Siting Report.

    Energy Technology Data Exchange (ETDEWEB)

    Montgomery, James M.

    1992-04-01

    This report presents the results of site analysis for the Umatilla Satellite and Release Sites Project. The purpose of this project is to provide engineering services for the siting and conceptual design of satellite and release facilities for the Umatilla Basin hatchery program. The Umatilla Basin hatchery program consists of artificial production facilities for salmon and steelhead to enhance production in the Umatilla River as defined in the Umatilla master plan approved in 1989 by the Northwest Power Planning Council. Facilities identified in the master plan include adult salmon broodstock holding and spawning facilities, facilities for recovery, acclimation, and/or extended rearing of salmon juveniles, and development of river sites for release of hatchery salmon and steelhead. The historic and current distribution of fall chinook, summer chinook, and coho salmon and steelhead trout was summarized for the Umatilla River basin. Current and future production and release objectives were reviewed. Twenty seven sites were evaluated for the potential and development of facilities. Engineering and environmental attributes of the sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  6. Factors of site selection for nuclear power plants in selected industrial states

    International Nuclear Information System (INIS)

    Hoffmann, L.; Obermair, G.; Ringler, W.; Romahn, B.; Sanders, H.

    1978-01-01

    The range of the tasks within the project consists of working out an optimal catalogue of criteria for the site selection for nuclear power plants; establishing a structured documentation system for the criteria and licensing procedures used by selected industrial countries when selecting sites for nuclear power plants; analyzing and evaluating the documented material with the aim of supplying the basis for decisions concerning land use. The tasks are being realized within a technological ring of data (for the period until 1990, reactor types, cooling, power-heat coupling, special sites, block sizes, local concentration) and a set politico-economical ring of data for the following countries: F.R. Germany, Belgium, Switzerland, Great Britain, Sweden, Denmark, Austria, France, Netherlands, USA, Japan, Yougoslavia. (HP) [de

  7. Selection Methodology Approach to Preferable and Alternative Sites for the First NPP Project in Yemen

    Energy Technology Data Exchange (ETDEWEB)

    Kassim, Moath [Kyunghe Univ., Yongin (Korea, Republic of); Kessel, David S. [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2015-05-15

    The purpose of this paper is to briefly present the methodology and results of the first siting study for the first nuclear power plant (NPP) in Yemen. In this study it has been demonstrated that there are suitable sites for specific unit/units power of 1000 MWt (about 300 MWe) nuclear power plant. To perform the site selection, a systematic selection method was developed. The method uses site-specific data gathered by literature review and expert judgement to identify the most important site selection criteria. A two-step site selection process was used. Candidate sites were chosen that meet a subset of the selection criteria that form the most important system constraints. These candidate sites were then evaluated against the full set of selection criteria using the Analytical Hierarchy Process Method (AHP). Candidate sites underwent a set of more specific siting criteria weighted by expert judgment to select preferable sites and alternatives using AHP method again. Expert Judgment method was used to rank and weight the importance of each criteria, then AHP method used to evaluate and weight the relation between criterion to criterion and between all criteria against the global weight. Then logical decision software was used to rank sites upon their weighting value.

  8. Selection Methodology Approach to Preferable and Alternative Sites for the First NPP Project in Yemen

    International Nuclear Information System (INIS)

    Kassim, Moath; Kessel, David S.

    2015-01-01

    The purpose of this paper is to briefly present the methodology and results of the first siting study for the first nuclear power plant (NPP) in Yemen. In this study it has been demonstrated that there are suitable sites for specific unit/units power of 1000 MWt (about 300 MWe) nuclear power plant. To perform the site selection, a systematic selection method was developed. The method uses site-specific data gathered by literature review and expert judgement to identify the most important site selection criteria. A two-step site selection process was used. Candidate sites were chosen that meet a subset of the selection criteria that form the most important system constraints. These candidate sites were then evaluated against the full set of selection criteria using the Analytical Hierarchy Process Method (AHP). Candidate sites underwent a set of more specific siting criteria weighted by expert judgment to select preferable sites and alternatives using AHP method again. Expert Judgment method was used to rank and weight the importance of each criteria, then AHP method used to evaluate and weight the relation between criterion to criterion and between all criteria against the global weight. Then logical decision software was used to rank sites upon their weighting value

  9. Site characterization quality assurance for the California LLRW Disposal Site Project

    International Nuclear Information System (INIS)

    Hanrahan, T.P.; Ench, J.E.; Serlin, C.L.; Bennett, C.B.

    1988-01-01

    In December of 1985 US Ecology was chosen as the license designee for the State of California's low-level radioactive waste disposal facility. In early 1987, three candidate sites were selected for characterization studies in preparation for identifying the preferred site. The geotechnical characterization activities along with studies of the ecological and archaeological attributes, as well as assessments of the socio-economic impacts and cultural resources all provide input towards selection of the proposed site. These technical studies in conjunction with comments from local citizen committees and other interested parties are used as a basis for determining the proposed site for which full site characterization as required by California licensing requirements are undertaken. The purpose of this paper is to present an overview of the program for Quality Assurance and Quality Control for the site characterization activities on the California LLRW Disposal Site Project. The focus is on three major perspectives: The composite QA Program and two of the primary characterization activities, the geotechnical and the meteorological investigations

  10. Replacement Power Facility site selection report

    Energy Technology Data Exchange (ETDEWEB)

    Wike, L.D.; Toole, G.L.; Specht, W.L.

    1992-06-01

    The Department of Energy (DOE) has proposed the construction and operation of a Replacement Power Facility (RPF) for supplementing and replacing existing sources of steam and possibly electricity at the Savannah River Site (SRS). DOE is preparing an Environmental Impact Statement (EIS) for this project As part of the impact analysis of the proposed action, the EIS will include a detailed description of the environment where the RPF will be constructed. This description must be specific to the recommended site at SRS, which contains more than 300 square miles of land including streams, lakes, impoundments, wetlands, and upland areas. A formal site-selection process was designed and implemented to identify the preferred RPF site.

  11. Site observational work plan for the UMTRA project site at Shiprock, New Mexico

    International Nuclear Information System (INIS)

    1994-09-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the initial document for developing site-specific activities to achieve regulatory compliance in the UMTRA Ground Water Project. The regulatory framework used to select the proposed ground water compliance strategies is presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. The Shiprock site consists of two, interconnected hydrogeologic systems: the terrace system and the floodplain system. Separate compliance strategies are proposed for these two systems. The compliance strategy for the terrace aquifer is no remediation with the application of supplemental standards based on classification of the terrace aquifer as having Class III (limited-use) ground water. The compliance strategy for the floodplain aquifer is active remediation using a subsurface biological barrier. These strategies were selected by applying site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement (PEIS) (DOE, 1994a). The site conceptual model indicates that milling-related contamination has impacted the ground water in the terrace and floodplain aquifers. Ground water occurs in both aquifers in alluvium and in fractures in the underlying Cretaceous age Mancos Shale. A mound of ground water related to fluids from the milling operations is thought to exist in the terrace aquifer below the area where settling ponds were in use during the mill operations. Most of the water occurring in the floodplain aquifer is from recharge from the San Juan River

  12. IT Project Selection

    DEFF Research Database (Denmark)

    Pedersen, Keld

    2016-01-01

    for initiation. Most of the research on project selection is normative, suggesting new methods, but available empirical studies indicate that many methods are seldom used in practice. This paper addresses the issue by providing increased understanding of IT project selection practice, thereby facilitating...... the development of methods that better fit current practice. The study is based on naturalistic decision-making theory and interviews with experienced project portfolio managers who, when selecting projects, primarily rely on political skills, experience and personal networks rather than on formal IT project......-selection methods, and these findings point to new areas for developing new methodological support for IT project selection....

  13. The viking landing sites: selection and certification.

    Science.gov (United States)

    Masursky, H; Crabill, N L

    1976-08-27

    During the past several years the Viking project developed plans to use Viking orbiter instruments and Earth-based radar to certify the suitability of the landing sites selected as the safest and most scientifically rewarding using Mariner 9 data. During June and July 1976, the Earth-based radar and orbital spacecraft observations of some of the prime and backup sites were completed. The results of these combined observations indicated that the Viking 1 prime landing area in the Chryse region of Mars is geologically varied and possibly more hazardous than expected, and was not certifiable as a site for the Viking 1 landing. Consequently, the site certification effort had to be drastically modified and lengthened to search for a site that might be safe enough to attempt to land. The selected site considered at 47.5 degrees W, 22.4 degrees N represented a compromise between desirable characteristics observed with visual images and those inferred from Earth-based radar. It lies in the Chryse region about 900 kilometers northwest of the original site. Viking 1 landed successfully at this site on 20 July 1976.

  14. Northeast Oregon Hatchery Project, Final Siting Report.

    Energy Technology Data Exchange (ETDEWEB)

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  15. Mock Site Licensing Demonstration Project. Final report

    International Nuclear Information System (INIS)

    Roop, R.D.

    1986-06-01

    The Mock Site Licensing Demonstration Project developed the Low-Level Radioactive Waste Siting Simulation, a role-playing exercise designed to facilitate the process of siting and licensing disposal facilities for low-level waste (LLW). This report describes the development, contant, and usefulness of the siting simulation. The simulation was designed by Harvard University's Program on Negotiation; it can be conducted at a workshop or conference, involves 14 or more participants, and requires about eight hours to complete. The simulation consists of two sessions. In the first, participants negotiate the selection of siting criteria, and in the second, a preferred site for a facility is chosen from three candidate sites. The project sponsored two workshops (in Boston, Massachusetts and Richmond, Virginia) in which the simulation was conducted for persons involved in planning for LLW. It is concluded that the siting simulation can be useful in three ways: (1) as a tool for information dissemination, (2) as a vehicle that can foste communication among parties in conflict, and (3) as a step toward consensus building and conflict resolution. The DOE National Low-Level Waste Management Program is now making the siting simulation available for use by states, regional compacts, and other organizations involved in development of LLW disposal facilities

  16. Low-level waste disposal site selection demonstration

    International Nuclear Information System (INIS)

    Rogers, V.C.

    1984-01-01

    This paper discusses the results of recent studies undertaken at EPRI related to low-level waste disposal technology. The initial work provided an overview of the state of the art including an assessment of its influence upon transportation costs and waste form requirements. The paper discusses work done on the overall system design aspects and computer modeling of disposal site performance characteristics. The results of this analysis are presented and provide a relative ranking of the importance of disposal parameters. This allows trade-off evaluations to be made of factors important in the design of a shallow land burial facility. To help minimize the impact of a shortage of low-level radioactive waste disposal sites, EPRI is closely observing the development of bellweather projects for developing new sites. The purpose of this activity is to provide information about lessons learned in those projects in order to expedite the development of additional disposal facilities. This paper describes most of the major stems in selecting a low-level radioactive waste disposal site in Texas. It shows how the Texas Low-Level Radioactive Waste Disposal Authority started with a wide range of potential siting areas in Texas and narrowed its attention down to a few preferred sites. The parameters used to discriminate between large areas of Texas and, eventually, 50 candidate disposal sites are described, along with the steps in the process. The Texas process is compared to those described in DOE and EPRI handbooks on site selection and to pertinent NRC requirements. The paper also describes how an inventory of low-level waste specific to Texas was developed and applied in preliminary performance assessments of two candidate sites. Finally, generic closure requirements and closure operations for low-level waste facilities in arid regions are given

  17. Site selection handbook: Workshop on site selection for low-level radioactive waste disposal facilities

    International Nuclear Information System (INIS)

    1987-10-01

    The Low-Level Radioactive Waste Policy Amendments Act of 1985 (LLRWPAA) requires the Department of Energy (DOE) to provide technical assistance to ''...those compact regions, host States and nonmember States determined by the Secretary to require assistance.'' Technical assistance has been defined to include, but not be limited to, ''technical guidelines for site selection.'' This site selection workshop was developed to assist States and Compacts in developing new low-level radioactive waste (LLW) disposal sites in accordance with the requirements of the LLRWPAA. The workshop comprises a series of lectures, discussion topics, and exercises, supported by this Site Selection Workshop Handbook, designed to examine various aspects of a comprehensive site selection program. It is not an exhaustive treatment of all aspects of site selection, nor is it prescriptive. The workshop focuses on the major elements of site selection and the tools that can be used to implement the site selection program

  18. Regulatory requirements for nuclear power plant site selection in Malaysia-a review.

    Science.gov (United States)

    Basri, N A; Hashim, S; Ramli, A T; Bradley, D A; Hamzah, K

    2016-12-01

    Malaysia has initiated a range of pre-project activities in preparation for its planned nuclear power programme. Clearly one of the first steps is the selection of sites that are deemed suitable for the construction and operation of a nuclear power plant. Here we outline the Malaysian regulatory requirements for nuclear power plant site selection, emphasizing details of the selection procedures and site characteristics needed, with a clear focus on radiation safety and radiation protection in respect of the site surroundings. The Malaysia Atomic Energy Licensing Board (AELB) site selection guidelines are in accord with those provided in International Atomic Energy Agency (IAEA) and United Stated Nuclear Regulatory Commission (USNRC) documents. To enhance the suitability criteria during selection, as well as to assist in the final decision making process, possible assessments using the site selection characteristics and information are proposed.

  19. The site selection process

    International Nuclear Information System (INIS)

    Kittel, J.H.

    1989-01-01

    One of the most arduous tasks associated with the management of radioactive wastes is the siting of new disposal facilities. Experience has shown that the performance of the disposal facility during and after disposal operations is critically dependent on the characteristics of the site itself. The site selection process consists of defining needs and objectives, identifying geographic regions of interest, screening and selecting candidate sites, collecting data on the candidate sites, and finally selecting the preferred site. Before the site selection procedures can be implemented, however, a formal legal system must be in place that defines broad objectives and, most importantly, clearly establishes responsibilities and accompanying authorities for the decision-making steps in the procedure. Site selection authorities should make every effort to develop trust and credibility with the public, local officials, and the news media. The responsibilities of supporting agencies must also be spelled out. Finally, a stable funding arrangement must be established so that activities such as data collection can proceed without interruption. Several examples, both international and within the US, are given

  20. Mitigation of Selected Hanford Site Manhattan Project and Cold War Era Artifacts

    International Nuclear Information System (INIS)

    Prendergast-Kennedy, Ellen L.; Harvey, David W.

    2006-01-01

    This document is the first time that Manhattan Project and Cold War era artifacts from the Hanford Site have been assembled within a publication. The publication presents photographic and written documentation of a number of Manhattan Project and Cold War era artifacts that were identified and tagged during assessment walk throughs of historic buildings on the Hanford Site but which could not be curated within the Hanford collection because they were too large for long-term storage and/or exhibit purposes or were radiologically contaminated. The significance of the artifacts in this publication and a proposed future appendix is based not on the individual significance of any single artifact but on their collective contribution to the science and engineering of creating plutonium and advancing nuclear technology in nuclear fuel and power.

  1. Mitigation of Selected Hanford Site Manhattan Project and Cold War Era Artifacts

    Energy Technology Data Exchange (ETDEWEB)

    Kennedy, Ellen P.; Harvey, David W.

    2006-09-08

    This document is the first time that Manhattan Project and Cold War era artifacts from the Hanford Site have been assembled within a publication. The publication presents photographic and written documentation of a number of Manhattan Project and Cold War era artifacts that were identified and tagged during assessment walk throughs of historic buildings on the Hanford Site but which could not be curated within the Hanford collection because they were too large for long-term storage and/or exhibit purposes or were radiologically contaminated. The significance of the artifacts in this publication and a proposed future appendix is based not on the individual significance of any single artifact but on their collective contribution to the science and engineering of creating plutonium and advancing nuclear technology in nuclear fuel and power.

  2. U.S. Department of Energy's site screening, site selection, and initial characterization for storage of CO2 in deep geological formations

    Science.gov (United States)

    Rodosta, T.D.; Litynski, J.T.; Plasynski, S.I.; Hickman, S.; Frailey, S.; Myer, L.

    2011-01-01

    The U.S. Department of Energy (DOE) is the lead Federal agency for the development and deployment of carbon sequestration technologies. As part of its mission to facilitate technology transfer and develop guidelines from lessons learned, DOE is developing a series of best practice manuals (BPMs) for carbon capture and storage (CCS). The "Site Screening, Site Selection, and Initial Characterization for Storage of CO2 in Deep Geological Formations" BPM is a compilation of best practices and includes flowchart diagrams illustrating the general decision making process for Site Screening, Site Selection, and Initial Characterization. The BPM integrates the knowledge gained from various programmatic efforts, with particular emphasis on the Characterization Phase through pilot-scale CO2 injection testing of the Validation Phase of the Regional Carbon Sequestration Partnership (RCSP) Initiative. Key geologic and surface elements that suitable candidate storage sites should possess are identified, along with example Site Screening, Site Selection, and Initial Characterization protocols for large-scale geologic storage projects located across diverse geologic and regional settings. This manual has been written as a working document, establishing a framework and methodology for proper site selection for CO2 geologic storage. This will be useful for future CO2 emitters, transporters, and storage providers. It will also be of use in informing local, regional, state, and national governmental agencies of best practices in proper sequestration site selection. Furthermore, it will educate the inquisitive general public on options and processes for geologic CO2 storage. In addition to providing best practices, the manual presents a geologic storage resource and capacity classification system. The system provides a "standard" to communicate storage and capacity estimates, uncertainty and project development risk, data guidelines and analyses for adequate site characterization, and

  3. Site selection and general layout of heap leaching uranium mill

    International Nuclear Information System (INIS)

    Zhang Chunmao; Rongfeng

    2011-01-01

    The site selection and general layout of uranium mill is an important work in the design and consultation stage of uranium mining and metallurgy's engineering construction. Based on the design practices, the principles and methods for the site selection and general layout of heap leaching uranium mill are analyzed and studied. Some problems which should be paid much attention to in the design are discussed in hopes of providing a useful reference for the design and consultation of similar projects. (authors)

  4. Site selection

    CERN Multimedia

    CERN PhotoLab

    1968-01-01

    To help resolve the problem of site selection for the proposed 300 GeV machine, the Council selected "three wise men" (left to right, J H Bannier of the Netherlands, A Chavanne of Switzerland and L K Boggild of Denmark).

  5. Finnish HLW disposal programme : site selection in 2000

    International Nuclear Information System (INIS)

    Ryhsnen, Veijo

    1997-01-01

    This paper covers the technical concepts for final disposal in the Finnish geological conditions, the approach for site selection and implementation, the safety assessments and development of criteria, the environmental impact assessment, the licensing stages and acceptance, and the financial provisions, the project organization in 1997 - 2000. 2 refs., 9 figs

  6. Finnish HLW disposal programme : site selection in 2000

    Energy Technology Data Exchange (ETDEWEB)

    Ryhsnen, Veijo [Posiva Oy, Helsinki (Finland)

    1997-12-31

    This paper covers the technical concepts for final disposal in the Finnish geological conditions, the approach for site selection and implementation, the safety assessments and development of criteria, the environmental impact assessment, the licensing stages and acceptance, and the financial provisions, the project organization in 1997 - 2000. 2 refs., 9 figs.

  7. Optimal Site Selection of Wind-Solar Complementary Power Generation Project for a Large-Scale Plug-In Charging Station

    Directory of Open Access Journals (Sweden)

    Wenjun Chen

    2017-10-01

    Full Text Available The wind-solar hybrid power generation project combined with electric vehicle charging stations can effectively reduce the impact on the power system caused by the random charging of electric cars, contribute to the in-situ wind-solar complementary system and reduce the harm arising from its output volatility. In this paper, the site selection index system of a landscape complementary power generation project is established by using the statistical methods and statistical analysis in the literature. Subsequently, using the Analytic Network Process to calculate the index weight, a cloud model was used in combination with preference ranking organization method for enrichment evaluations to transform and sort uncertain language information. Finally, using the results of the decision-making for the location of the Shanghai wind-solar complementary project and by carrying out contrast analysis and sensitivity analysis, the superiority and stability of the decision model constructed in this study was demonstrated.

  8. Development of a site analysis tool for distributed wind projects

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, Shawn [The Cadmus Group, Inc., Waltham MA (United States)

    2012-02-28

    The Cadmus Group, Inc., in collaboration with the National Renewable Energy Laboratory (NREL) and Encraft, was awarded a grant from the Department of Energy (DOE) to develop a site analysis tool for distributed wind technologies. As the principal investigator for this project, Mr. Shawn Shaw was responsible for overall project management, direction, and technical approach. The product resulting from this project is the Distributed Wind Site Analysis Tool (DSAT), a software tool for analyzing proposed sites for distributed wind technology (DWT) systems. This user-friendly tool supports the long-term growth and stability of the DWT market by providing reliable, realistic estimates of site and system energy output and feasibility. DSAT-which is accessible online and requires no purchase or download of software-is available in two account types; Standard: This free account allows the user to analyze a limited number of sites and to produce a system performance report for each; and Professional: For a small annual fee users can analyze an unlimited number of sites, produce system performance reports, and generate other customizable reports containing key information such as visual influence and wind resources. The tool’s interactive maps allow users to create site models that incorporate the obstructions and terrain types present. Users can generate site reports immediately after entering the requisite site information. Ideally, this tool also educates users regarding good site selection and effective evaluation practices.

  9. Site selection for nuclear power plants and geologic seismologia influence

    International Nuclear Information System (INIS)

    Castro Feitosa, G. de.

    1985-01-01

    The site selection for nuclear power plants is analised concerning to the process, methodology and the phases in an overall project efforts. The factors affecting are analised on a general viewpoint, showing the considerations given to every one. The geologic and seismologic factors influence on the foundation design are more detailed analised, with required investigation and procedures accordingly sub-soil conditions in the site [pt

  10. Agricultural biogas. Intermediate assessment - Biogas Mission. The Energivie Program - Projects of development of farm-based methanization. Site selection, Visits of installations, Consultation of installers

    International Nuclear Information System (INIS)

    Maurer, Michel

    2005-06-01

    A first document presents Alsace pilot projects: technical and economic recalls, site pre-selection, project leader, description of the mobilisation of lipid co-substrates (interest of fats, modalities), regulatory context (for biogas production, electric energy supply and digestate use). It also presents installer companies which have been consulted for these projects. Another document proposes technical and economical analyses of proposals made by installers, and an analysis of deadlocking points for these pilot projects. Technical, economic, and environmental elements, as well as those dealing with installation management, costs and construction delays to be provided by the consulted company are indicated and commented

  11. Northeast Oregon Hatchery Project final siting report. Final report

    International Nuclear Information System (INIS)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed

  12. National Ignition Facility Project Site Safety Program

    International Nuclear Information System (INIS)

    Dun, C

    2003-01-01

    This Safety Program for the National Ignition Facility (NIF) presents safety protocols and requirements that management and workers shall follow to assure a safe and healthful work environment during activities performed on the NIF Project site. The NIF Project Site Safety Program (NPSSP) requires that activities at the NIF Project site be performed in accordance with the ''LLNL ES and H Manual'' and the augmented set of controls and processes described in this NIF Project Site Safety Program. Specifically, this document: (1) Defines the fundamental NIF site safety philosophy. (2) Defines the areas covered by this safety program (see Appendix B). (3) Identifies management roles and responsibilities. (4) Defines core safety management processes. (5) Identifies NIF site-specific safety requirements. This NPSSP sets forth the responsibilities, requirements, rules, policies, and regulations for workers involved in work activities performed on the NIF Project site. Workers are required to implement measures to create a universal awareness that promotes safe practice at the work site and will achieve NIF management objectives in preventing accidents and illnesses. ES and H requirements are consistent with the ''LLNL ES and H Manual''. This NPSSP and implementing procedures (e.g., Management Walkabout, special work procedures, etc.,) are a comprehensive safety program that applies to NIF workers on the NIF Project site. The NIF Project site includes the B581/B681 site and support areas shown in Appendix B

  13. Near-Site Transportation Infrastructure Project

    International Nuclear Information System (INIS)

    Viebrock, J.M.; Mote, N.

    1992-02-01

    There are 122 commercial nuclear facilities from which spent nuclear fuel will be accepted by the Federal Waste Management System (FWMS). Since some facilities share common sites and some facilities are on adjacent sites, 76 sites were identified for the Near-Site Transportation Infrastructure (NSTI) project. The objective of the NSTI project was to identify the options available for transportation of spent-fuel casks from each of these commercial nuclear facility sites to the main transportation routes -- interstate highways, commercial rail lines and navigable waterways available for commercial use. The near-site transportation infrastructure from each site was assessed, based on observation of technical features identified during a survey of the routes and facilities plus data collected from referenced information sources. The potential for refurbishment of transportation facilities which are not currently operational was also assessed, as was the potential for establishing new transportation facilities

  14. A successful effort to involve stakeholders in the selection of a site for a corrective action management unit

    International Nuclear Information System (INIS)

    Conway, R.; Merkhofer, M.W.; Oms, E.

    1995-01-01

    As part of the effort to clean up hazardous waste sites, Sandia National Laboratories in New Mexico (SNL/NM) adopted a novel approach to involving stakeholders in a key decision associated with its Environmental Restoration (ER) Project. The decision was where to locate a Corrective Action Management Unit (CAMU), an area designed to consolidate, store, and treat wastes generated from cleanup activities. The decision-making approach was a variation of a technique known as multiattribute utility analysis (MUA). Although MUA has rarely been undertaken during normal Project activities, it proved to be a surprisingly effective means for involving stakeholders in the decision process, generating consensus over a selected site, and enhancing public trust and understanding of Project activities. Requirements and criteria for selecting CAMU sites are provided by the Environmental Protection Agency's (EPA's) CAMU Final Rule (EPA 1993). Recognizing the lack of experience with the Rule and the importance of community understanding and support, the ER Project sought an approach that would allow stakeholders to participate in the site-selection process

  15. Analytic hierarchy process helps select site for limestone quarry expansion in Barbados.

    Science.gov (United States)

    Dey, Prasanta Kumar; Ramcharan, Eugene K

    2008-09-01

    Site selection is a key activity for quarry expansion to support cement production, and is governed by factors such as resource availability, logistics, costs, and socio-economic-environmental factors. Adequate consideration of all the factors facilitates both industrial productivity and sustainable economic growth. This study illustrates the site selection process that was undertaken for the expansion of limestone quarry operations to support cement production in Barbados. First, alternate sites with adequate resources to support a 25-year development horizon were identified. Second, technical and socio-economic-environmental factors were then identified. Third, a database was developed for each site with respect to each factor. Fourth, a hierarchical model in analytic hierarchy process (AHP) framework was then developed. Fifth, the relative ranking of the alternate sites was then derived through pair wise comparison in all the levels and through subsequent synthesizing of the results across the hierarchy through computer software (Expert Choice). The study reveals that an integrated framework using the AHP can help select a site for the quarry expansion project in Barbados.

  16. Site selection for Canada's national repository for used nuclear fuel

    International Nuclear Information System (INIS)

    Ben Belfadhel, M.; Watts, B.; Facella, J.

    2015-01-01

    In 2007, the Government of Canada selected Adaptive Phased Management as Canada's plan for the long-term management of Canada's used nuclear fuel. The approach provides for containment and isolation of the material in a deep geological repository at a safe site with an informed and willing host. The Nuclear Waste Management Organization is tasked through federal legislation with selecting the site and developing and managing all aspects of the plan. In May 2010, the organization published and initiated the site selection process that serves as a road map for decision making on the location for the deep geological repository. It continues to lead the site selection process for the repository and an associated Centre of Expertise. The screening process is advancing and, from an initial starting point of 22 communities expressing interest in learning about the project; as of September 2015, 9 communities are the focus of more detailed technical and community well-being studies. Preliminary Assessments, the third step in the 9-step site selection process are underway in these communities. The Assessments involve preliminary technical and social desktop and field assessments, engagement activities within and beyond each interested community, and involvement of Indigenous peoples and nearby municipalities in the planning and conduct of the work. This paper provides an update on the advancement of the site selection process. It describes the nature of the technical and social studies being conducted at this phase of work, including the progressively more detailed field studies that are the focus of technical work at the current stage, the approach to engagement and collaboration with communities to direct these studies, and the work underway to ensure the framework used for this assessment and engagement includes the range of priorities and perspectives of First Nations and Metis peoples and communities in the broader area. (author)

  17. Application of QA grading to Yucca Mountain Site Characterization Project items and activities

    International Nuclear Information System (INIS)

    Murthy, R.B.; Smith, S.C.

    1991-01-01

    Grading is the act of selecting the quality assurance (QA) measures necessary to develop and maintain confidence in the quality of an item or activity. The list of QA measures from which this selection is made are the 20 criteria of the Yucca Mountain Site Characterization Project Quality Assurance Requirements Document

  18. Process for selecting a site for Canada's deep geological repository for used nuclear fuel

    International Nuclear Information System (INIS)

    Facella, J.; Belfadhel, M.B.

    2011-01-01

    The Nuclear Waste Management Organization (NWMO) is responsible for implementing Adaptive Phased Management, the approach selected by the Government of Canada for long-term management of used nuclear fuel waste generated by Canadian nuclear reactors. The ultimate objective of Adaptive Phased Management is the centralized containment and isolation of Canada's used nuclear fuel in a Deep Geological Repository in a suitable crystalline or sedimentary rock formation at a depth of about 500m. The repository will consist of a series of access and service shafts and a series of tunnels leading to placement rooms where used fuel will be placed and sealed in competent rock using a multi-barrier system which includes long lived specially designed containers, sealing materials such as bentonite and the rock itself. The used fuel will be monitored throughout all phases of implementation and will also remain retrievable for an extended period of time. In May 2010, the NWMO published the site selection process that serves as the road map to decision-making on the location for the deep geological repository. NWMO initiated the process with a first stage that invites communities to learn more about the project and the site selection process. NWMO is actively building awareness of the project and, on request of communities, is delivering briefings, supporting community capacity building and undertaking high-level screenings of site suitability. The paper provides a brief description of: Adaptive Phased Management including the deep geological repository which is its ultimate goal, and the design of the site selection process, and importantly the approach to assessing the suitability of sites from both a social and technical perspective. The paper will outline how NWMO sought to develop a socially-acceptable site selection process as a firm foundation for future decisions on siting. Through a two-year collaborative process, NWMO sought to understand the expectations of

  19. Selection of adequate site location during early stages of construction project management: A multi-criteria decision analysis approach

    Science.gov (United States)

    Marović, Ivan; Hanak, Tomaš

    2017-10-01

    In the management of construction projects special attention should be given to the planning as the most important phase of decision-making process. Quality decision-making based on adequate and comprehensive collaboration of all involved stakeholders is crucial in project’s early stages. Fundamental reasons for existence of this problem arise from: specific conditions of construction industry (final products are inseparable from the location i.e. location has a strong influence of building design and its structural characteristics as well as technology which will be used during construction), investors’ desires and attitudes, and influence of socioeconomic and environment aspects. Considering all mentioned reasons one can conclude that selection of adequate construction site location for future investment is complex, low structured and multi-criteria problem. To take into account all the dimensions, the proposed model for selection of adequate site location is devised. The model is based on AHP (for designing the decision-making hierarchy) and PROMETHEE (for pairwise comparison of investment locations) methods. As a result of mixing basis feature of both methods, operational synergies can be achieved in multi-criteria decision analysis. Such gives the decision-maker a sense of assurance, knowing that if the procedure proposed by the presented model has been followed, it will lead to a rational decision, carefully and systematically thought out.

  20. ITER site selection studies in Spain

    International Nuclear Information System (INIS)

    Medrano, M.; Alejaldre, C.; Doncel, J.; Garcia, A.; Ibarra, A.; Jimenez, J.A.; Sanchez de Mora, M.A.; Alcala, F.; Diez, J.E.; Dominguez, M.; Albisu, F.

    2003-01-01

    The studies carried out to evaluate and select a candidate site for International Thermonuclear Experimental Reactor (ITER) construction in Spain are presented in this paper. The ITER design, completed in July 2001, considered a number of technical requirements that must be fulfilled by the selected site. Several assumptions concerning the ITER site were made in order to carry on the design before final site selection. In the studies undertaken for ITER site selection in Spain, the referred technical requirements and assumptions were applied across the whole of Spain and two areas were identified as being preferential. These areas are on the Mediterranean coast and are situated in the Catalan and Valencian regions. A comparative evaluation based on technical characteristics for the concrete plots, proposed within the preferential areas, has been done. The result of these studies was the selection of a site that was deemed to be the most competitive--Vandellos (Tarragona)--and it was proposed to the European Commission for detailed studies in order to be considered as a possible European site for ITER construction. Another key factor for hosting ITER in Spain, is the licensing process. The present status is summarised in this paper

  1. Project Rio Blanco: site restoration. Final report

    International Nuclear Information System (INIS)

    1978-01-01

    Project Rio Blanco was a joint Government-industry experiment using nuclear explosives to stimulate the flow of natural gas from low permeability formations which could not be economically produced through conventional methods. The project consisted of the simultaneous detonation of three nuclear explosives on May 17, 1973, in a 7,000 foot well in northwestern Colorado. Gas production testing and project evaluation continued through June 1976. The site cleanup and restoration planning phase began in December 1975 and was concluded with the issuance of an operational plan, Project Rio Blanco Site Cleanup and Restoration Plan, NVO-173, in May 1976. Actual site restoration activities were conducted during the period from July to November 1976. The activities throughout the restoration period are summarized and the final site status, including the disposition of all project facilities and the status of all project related wells after plug and abandonment and recompletion work are described

  2. NASA Parts Selection List (NPSL) WWW Site http://nepp.nasa.gov/npsl

    Science.gov (United States)

    Brusse, Jay

    2000-01-01

    The NASA Parts Selection List (NPSL) is an on-line resource for electronic parts selection tailored for use by spaceflight projects. The NPSL provides a list of commonly used electronic parts that have a history of satisfactory use in spaceflight applications. The objective of this www site is to provide NASA projects, contractors, university experimenters, et al with an easy to use resource that provides a baseline of electronic parts from which designers are encouraged to select. The NPSL is an ongoing resource produced by Code 562 in support of the NASA HQ funded NASA Electronic Parts and Packaging (NEPP) Program. The NPSL is produced as an electronic format deliverable made available via the referenced www site administered by Code 562. The NPSL does not provide information pertaining to patented or proprietary information. All of the information contained in the NPSL is available through various other public domain resources such as US Military procurement specifications for electronic parts, NASA GSFC's Preferred Parts List (PPL-21), and NASA's Standard Parts List (MIL-STD975).

  3. EPRtm project experience: selection of partners and supply chain

    International Nuclear Information System (INIS)

    Lorenzo, D. de

    2012-01-01

    With 4 EPR T M units under construction, the new plants to be built in the following years will benefit from the return on experience of the work already performed. The knowledge about licensing processes, detail engineering, supply chain, logistics and on-site work gathered from the Olkiluoto 3 and Flamanville 3 projects has already been used in the Taishan 1 and 2 project, resulting in a project that is on schedule and on budget. This article will show how the advantage of such broad experience gained will be used to benefit future projects to ensure certainty of completion, leaving few and limited unresolved issues even before the beginning of the project. Several areas that are not usually tackled when speaking of a New Build project will be covered by this text from the point of view of a nuclear vendor: Project Partnership Selection and the Gate Review Process applied by AREVA in the supply chain of the main components. (Author)

  4. IDENTIFICATION AND SELECTION OF SIX SIGMA PROJECTS

    Directory of Open Access Journals (Sweden)

    Abdalhkeim FA. Flifel

    2017-04-01

    Full Text Available Six Sigma is a well-structured and proven methodology for improving organizational performance. It helps achieving the goals of the organization through the use of project-driven approach. The implementation of Six sigma approach depends on proper identification and selection of projects, moreover, the selection of right Six sigma projects is one of the critical success factors of six sigma efforts. The paper provides the sources for the identification of potential projects, top down and bottom up approaches, the process of selection of projects, guidelines that assist the selection of appropriate projects, selection criteria which must be precisely chosen in accordance with the objectives, needs and capabilities of the organization as well as sophisticated techniques and tools recommended in the literature for the selection of projects.

  5. Participation of concerned citizens in site selection decisions; Einbeziehung der Betroffenen in die Entscheidungen bei Standortauswahlverfahren

    Energy Technology Data Exchange (ETDEWEB)

    Appel, D. [PanGeo - Geowissenschaftliches, Buero (Germany)

    2003-07-01

    The contribution presents preliminary results of two international projects aimed at integrating the general public, or parts thereof, in the decision process of selecting ultimate storage sites. The author participated in these projects and is a former member of the task group for selection of ultimate storage sites (Arbeitskreis Auswahlverfahren Endlagerstandorte - AkEnd). The two projects are: Forum on Stakeholder Confidence (FSC) of the Nuclear Energy Agency (NEA) OECD, Project 'COWAM' (Community Waste Management) of the European Commission. The participants, goals and methods of the two projects were different, but they both presented concrete methods of selecting ultimate storage sites from the view of different actors in the form of case studies. The focus was on the participation of the public and its importance for success. Apart from meeting technical requirements the selection process should also take account of the requirements of democracy and citizens' participation in order to gain wide acceptance for its results. Deficiencies and advantages of the proposed selection processes are analyzed, and general requirements on the decision process in site selection are derived. (orig.) [German] Im folgenden wird ueber (vorlaeufige) Ergebnisse zweier internationaler Projekte zur Einbeziehung der Oeffentlichkeit bzw. von Teilen davon in den Entscheidungsprozess bei der Auswahl von Endlagerstandorten berichtet, an denen der Autor im Auftrag des Bundesumweltministers und als (ehemaliges) Mitglied des Arbeitskreises Auswahlverfahren Endlagerstandorte (AkEnd) beteiligt war bzw. ist: - Forum on Stakeholder Confidence (FSC) der Nuclear Energy Agency (NEA) OECD, - Projekt 'COWAM' (Community Waste Management) der Europaeischen Kommission (abgeschlossen, Abschlussbericht erscheint in diesem Jahr). Die Zusammensetzung der Teilnehmergruppen beider Projekte, genaue Zielsetzung der Projekte und die Arbeitsweise sind unterschiedlich. In beiden

  6. Process for selecting a site for Canada's deep geological repository for used nuclear fuel

    International Nuclear Information System (INIS)

    Facella, J.; Ben Belfadhel, M.; Patton, P.

    2012-01-01

    'Full Text:' The Nuclear Waste Management Organization (NWMO) is responsible for implementing Adaptive Phased Management, the approach selected by the Government of Canada for long-term management of used nuclear fuel waste generated by Canadian nuclear reactors. The ultimate objective of Adaptive Phased Management is the centralized containment and isolation of Canada's used nuclear fuel in a Deep Geological Repository in a suitable crystalline or sedimentary rock formation at a depth of about 500m. The repository will consist of a series of access and service shafts and a series of tunnels leading to placement rooms where used fuel will be placed and sealed in competent rock using a multi-barrier system which includes long lived specially designed containers, sealing materials such as bentonite and the rock itself. The used fuel will be monitored throughout all phases of implementation and will also remain retrievable for an extended period of time. In May 2010, the NWMO published the site selection process that serves as the road map to decision-making on the location for the deep geological repository. NWMO initiated the process with a first stage that invites communities to learn more about the project and the site selection process. NWMO is actively building awareness of the project and, on request of communities, is delivering briefings, supporting community capacity building and undertaking screenings of site suitability. This panel presentation provides a brief description of: Adaptive Phased Management including the deep geological repository which is its ultimate goal, and the design of the site selection process, and importantly the approach to assessing the suitability of sites from both a social and technical perspective. The panel presentation will be conducted in three parts: site selection process and engagement, Aboriginal engagement and Technical evaluations, followed by a discussion. The presentation will outline how NWMO sought

  7. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    Energy Technology Data Exchange (ETDEWEB)

    Ewy, Ann; Hays, David [U.S. Army Corps of Engineers (United States)

    2013-07-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  8. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    International Nuclear Information System (INIS)

    Ewy, Ann; Hays, David

    2013-01-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  9. Geospatial Optimization of Siting Large-Scale Solar Projects

    Energy Technology Data Exchange (ETDEWEB)

    Macknick, Jordan [National Renewable Energy Lab. (NREL), Golden, CO (United States); Quinby, Ted [National Renewable Energy Lab. (NREL), Golden, CO (United States); Caulfield, Emmet [Stanford Univ., CA (United States); Gerritsen, Margot [Stanford Univ., CA (United States); Diffendorfer, Jay [U.S. Geological Survey, Boulder, CO (United States); Haines, Seth [U.S. Geological Survey, Boulder, CO (United States)

    2014-03-01

    Recent policy and economic conditions have encouraged a renewed interest in developing large-scale solar projects in the U.S. Southwest. However, siting large-scale solar projects is complex. In addition to the quality of the solar resource, solar developers must take into consideration many environmental, social, and economic factors when evaluating a potential site. This report describes a proof-of-concept, Web-based Geographical Information Systems (GIS) tool that evaluates multiple user-defined criteria in an optimization algorithm to inform discussions and decisions regarding the locations of utility-scale solar projects. Existing siting recommendations for large-scale solar projects from governmental and non-governmental organizations are not consistent with each other, are often not transparent in methods, and do not take into consideration the differing priorities of stakeholders. The siting assistance GIS tool we have developed improves upon the existing siting guidelines by being user-driven, transparent, interactive, capable of incorporating multiple criteria, and flexible. This work provides the foundation for a dynamic siting assistance tool that can greatly facilitate siting decisions among multiple stakeholders.

  10. Site selection for Canada's national repository for used nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    Ben Belfadhel, M.; Watts, B.; Facella, J., E-mail: mbenbelfadhel@nwmo.ca [Nuclear Waste Management Organization (NWMO), Toronto, Ontario (Canada)

    2015-12-15

    In 2007, the Government of Canada selected Adaptive Phased Management as Canada's plan for the long-term management of Canada's used nuclear fuel. The approach provides for containment and isolation of the material in a deep geological repository at a safe site with an informed and willing host. The Nuclear Waste Management Organization is tasked through federal legislation with selecting the site and developing and managing all aspects of the plan. In May 2010, the organization published and initiated the site selection process that serves as a road map for decision making on the location for the deep geological repository. It continues to lead the site selection process for the repository and an associated Centre of Expertise. The screening process is advancing and, from an initial starting point of 22 communities expressing interest in learning about the project; as of September 2015, 9 communities are the focus of more detailed technical and community well-being studies. Preliminary Assessments, the third step in the 9-step site selection process are underway in these communities. The Assessments involve preliminary technical and social desktop and field assessments, engagement activities within and beyond each interested community, and involvement of Indigenous peoples and nearby municipalities in the planning and conduct of the work. This paper provides an update on the advancement of the site selection process. It describes the nature of the technical and social studies being conducted at this phase of work, including the progressively more detailed field studies that are the focus of technical work at the current stage, the approach to engagement and collaboration with communities to direct these studies, and the work underway to ensure the framework used for this assessment and engagement includes the range of priorities and perspectives of First Nations and Metis peoples and communities in the broader area. (author)

  11. Site characterization activities at Stripa and other Swedish projects

    International Nuclear Information System (INIS)

    Ahlstroehm, P.E.

    1991-01-01

    The Swedish research programme concerning spent nuclear fuel disposal aims for submitting a siting license application around the year 2000. An important step towards that goal will be the detailed characterization of at least two potential sites in late 1990s. In preparation for such characterization several research projects are conducted. One is the international Stripa Project that includes a site characterization and validation project for a small size granite rock body. The Stripa work also includes further development of instrumentation and measurement techniques. Another project is the Finnsjoen Fracture Zone Project, which is characterizing a subhorizontal zone at depths from 100 to 350 meters. The third project is the new Swedish Hard Rock Laboratory planned at the site of the Oskarshamn nuclear power plant. The preinvestigations and construction of this laboratory include major efforts in development, application and validation of site characterization methodology. (author) 6 figs., 9 refs

  12. Site selection: Past and present

    International Nuclear Information System (INIS)

    Tilford, N.R.

    1994-01-01

    Site selection has been going on since the earliest times. The process has evolved through the Industrial Revolution to the present period of exploding population and environmental awareness. Now the work must be done both with increasing sophistication and greater transparency. Modern techniques for site selection have been developed during the last two decades or so, utilizing a teachable body of knowledge and a growing literature. Many firms and individuals have contributed to this growing field. The driving force has been the need for such a process in siting and licensing of critical facilities such as nuclear power plants. A list of crucial, documented steps for identifying social impacts and acceptability are provided. A recent innovation is the self-selection method developed by government. The Superconducting Supercollider serves as an example of this approach. Geological or geologically dependent factors often dominate the process. The role as engineering and environmental geoscientists is to provide responsible leadership, consultation, and communication to the effort

  13. Resource Conservation and Recovery Act Industrial Sites quality assurance project plan: Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    1994-06-01

    This quality assurance project plan (QAPjP) describes the measures that shall be taken to ensure that the environmental data collected during characterization and closure activities of Resource Conservation and Recovery Act (RCRA) Industrial Sites at the Nevada Test Site (NTS) are meaningful, valid, defensible, and can be used to achieve project objectives. These activities are conducted by the US Department of Energy Nevada Operations Office (DOE/NV) under the Nevada Environmental Restoration (ER) Project. The Nevada ER Project consists of environmental restoration activities on the NTS, Tonopah Test Range, Nellis Air Force Range, and eight sites in five other states. The RCRA Industrial Sites subproject constitutes a component of the Nevada ER Project. Currently, this QAPjP is limited to the seven RCRA Industrial Sites identified within this document that are to be closed under an interim status and pertains to all field- investigation, analytical-laboratory, and data-review activities in support of these closures. The information presented here supplements the RCRA Industrial Sites Project Management Plan and is to be used in conjunction with the site-specific subproject sampling and analysis plans

  14. Early Site Permit Demonstration Program: Siting Guide, Site selection and evaluation criteria for an early site permit application

    International Nuclear Information System (INIS)

    1993-01-01

    In August 1991, the Joint Contractors came to agreement with Sandia National Laboratories (SNL) and the Department of Energy (DOE) on a workscope for the cost-shared Early Site Permit Demonstration Program. One task within the scope was the development of a guide for site selection criteria and procedures. A generic Siting Guide his been prepared that is a roadmap and tool for applicants to use developing detailed siting plans for their specific region of the country. The guide presents three fundamental principles that, if used, ensure a high degree of success for an ESP applicant. First, the site selection process should take into consideration environmentally diverse site locations within a given region of interest. Second, the process should contain appropriate opportunities for input from the public. Third, the process should be applied so that it is clearly reasonable to an impartial observer, based on appropriately selected criteria, including criteria which demonstrate that the site can host an advanced light water reactor (ALWR). The Siting Guide provides for a systematic, comprehensive site selection process in which three basic types of criteria (exclusionary, avoidance, and suitability) are presented via a four-step procedure. It provides a check list of the criteria for each one of these steps. Criteria are applied qualitatively, as well as presented numerically, within the guide. The applicant should use the generic guide as an exhaustive checklist, customizing the guide to his individual situation

  15. Site selection for nuclear power plants

    International Nuclear Information System (INIS)

    Ehjchkholz, D.

    1980-01-01

    Problem of NPP site selection in the USA including engineering factors, radiation and environmental protection factors is stated in detail. Floating and underground sites are considered especially. The attention in paid to waste storage and risk criterium in siting [ru

  16. Cornell University remote sensing program. [application to waste disposal site selection, study of drainage patterns, and water quality management.

    Science.gov (United States)

    Liang, T.; Mcnair, A. J.; Philipson, W. R.

    1977-01-01

    Aircraft and satellite remote sensing technology were applied in the following areas: (1) evaluation of proposed fly ash disposal sites; (2) development of priorities for drainage improvements; (3) state park analysis for rehabilitation and development; (4) watershed study for water quality planning; and (5) assistance project-landfill site selection. Results are briefly summarized. Other projects conducted include: (1) assessment of vineyard-related problems; (2) LANDSAT analysis for pheasant range management; (3) photo-historic evaluation of Revolutionary War sites; and (4) thermal analysis of building insulation. The objectives, expected benefits and actions, and status of these projects are described.

  17. Further development of public participation in the site-selection and approval process of a final repository in Germany

    Energy Technology Data Exchange (ETDEWEB)

    Barth, Regine; Kallenbach-Herbert, Beate [OeEo-Institute e.V., Inst. for Applied Ecology, Darmstadt (Germany); Arens, Georg [Federal Office for Radiation Protection (BfS), Salzgitter (Germany)

    2006-09-15

    This paper reflects the first findings of a current research project funded by the German Federal Office for Radiation Protection and conducted by an interdisciplinary working group of the OEko-Institute. One focus of this project is the systematic analysis of past and existing participatory processes in different nuclear and non-nuclear projects. On the basis of this analysis and a literature review a specific concept for public participation in the site-selection and approval process of a repository for high radioactive waste (HAW repository) in Germany will be derived. The concept shall foster transparency and acceptance. The working group of the OEko-Institute combines long standing research experience and an intimate knowledge of radioactive waste management including political, technical, management and social problems of final disposal on the one hand. On the other hand members play an active role in stakeholder processes of different non-nuclear projects as well as experience with a wide range of participative measures and their impact. This allows an approach which integrates the specific features of radioactive waste disposal with a wider perspective on the demands and opportunities of stakeholder processes. The procedure of site selection for a HAW repository in Germany still has to be specified. The procedure introduced by the 'Committee on a Site Selection Procedure for Repository Sites' (Arbeitskreis Auswahlverfahren Endlagerstandorte - AkEnd) has not been adopted. The Committee had suggested installing a negotiation group to discuss the AkEnd proposals in the so called 'Phase II'. This suggestion could not be followed because not all relevant stakeholders were willing to participate. An internal draft for a federal law implementing main elements of the AkEnd findings was developed by the Ministry for Environment in 2005, but has never been brought to the cabinet. Due to the change of Government in Germany, the next steps still are

  18. Further development of public participation in the site-selection and approval process of a final repository in Germany

    International Nuclear Information System (INIS)

    Barth, Regine; Kallenbach-Herbert, Beate; Arens, Georg

    2006-01-01

    This paper reflects the first findings of a current research project funded by the German Federal Office for Radiation Protection and conducted by an interdisciplinary working group of the OEko-Institute. One focus of this project is the systematic analysis of past and existing participatory processes in different nuclear and non-nuclear projects. On the basis of this analysis and a literature review a specific concept for public participation in the site-selection and approval process of a repository for high radioactive waste (HAW repository) in Germany will be derived. The concept shall foster transparency and acceptance. The working group of the OEko-Institute combines long standing research experience and an intimate knowledge of radioactive waste management including political, technical, management and social problems of final disposal on the one hand. On the other hand members play an active role in stakeholder processes of different non-nuclear projects as well as experience with a wide range of participative measures and their impact. This allows an approach which integrates the specific features of radioactive waste disposal with a wider perspective on the demands and opportunities of stakeholder processes. The procedure of site selection for a HAW repository in Germany still has to be specified. The procedure introduced by the 'Committee on a Site Selection Procedure for Repository Sites' (Arbeitskreis Auswahlverfahren Endlagerstandorte - AkEnd) has not been adopted. The Committee had suggested installing a negotiation group to discuss the AkEnd proposals in the so called 'Phase II'. This suggestion could not be followed because not all relevant stakeholders were willing to participate. An internal draft for a federal law implementing main elements of the AkEnd findings was developed by the Ministry for Environment in 2005, but has never been brought to the cabinet. Due to the change of Government in Germany, the next steps still are under consideration

  19. Canada's deep geological repository for used nuclear fuel - site selection process update

    International Nuclear Information System (INIS)

    Facella, J.

    2014-01-01

    In 2007, the Government of Canada selected Adaptive Phased Management as Canada's plan for the long-term management of Canada's used nuclear fuel in a deep geological repository, located in an informed and willing host. The process of site selection is an important milestone in this program. The NWMO describes its approach to working collaboratively with communities which expressed interest in exploring the project, as well as Aboriginal communities in the area and other surrounding communities. The project is designed to be implemented through a long-term partnership involving the interested community, Aboriginal communities and surrounding communities working with the NWMO. (author)

  20. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Vol. 18. Part 2. Indexes

    International Nuclear Information System (INIS)

    1997-09-01

    This bibliography contains 3638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D ampersand D), uranium mill tailings management, and site remedial actions. This report is the eighteenth in a series of bibliographies prepared annually for the U.S. Department of Energy (DOE) Office of Environmental Restoration. Citations to foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - have been included in Part 1 of the report. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D ampersand D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Programs; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluations; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues. Within the 16 sections, the citations are sorted by geographic location. If a geographic location is not specified, the citations are sorted according to the document title. In Part 2 of the report, indexes are provided for author, author affiliation, selected title phrase, selected title word, publication description, geographic location, and keyword

  1. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Vol. 18. Part 2. Indexes

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This bibliography contains 3638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D&D), uranium mill tailings management, and site remedial actions. This report is the eighteenth in a series of bibliographies prepared annually for the U.S. Department of Energy (DOE) Office of Environmental Restoration. Citations to foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - have been included in Part 1 of the report. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D&D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Programs; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluations; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues. Within the 16 sections, the citations are sorted by geographic location. If a geographic location is not specified, the citations are sorted according to the document title. In Part 2 of the report, indexes are provided for author, author affiliation, selected title phrase, selected title word, publication description, geographic location, and keyword.

  2. Site observational work plan for the UMTRA Project site at Falls City, Texas

    International Nuclear Information System (INIS)

    1995-06-01

    Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy

  3. Site 300 hazardous-waste-assessment project. Interim report: December 1981. Preliminary site reconnaissance and project work plan

    International Nuclear Information System (INIS)

    Raber, E.; Helm, D.; Carpenter, D.; Peifer, D.; Sweeney, J.

    1982-01-01

    This document was prepared to outline the scope and objectives of the Hazardous Waste Assessment Project (HWAP) at Site 300. This project was initiated in October, 1981, to investigate the existing solid waste landfills in an effort to satisfy regulatory guidelines and assess the potential for ground-water contamination. This involves a site-specific investigation (utilizing geology, hydrology, geophysics and geochemistry) with the goal of developing an effective ground-water quality monitoring network. Initial site reconnaissance work has begun and we report the results, to date, of our geologic hydrogeologic studies. All known solid waste disposal locations are underlain by rocks of either the Late Miocene Neroly Formation or the Cierbo Formation, both of which are dominantly sandstones interbedded with shale and claystone. The existence of a regional confined (artesian) aquifer, as well as a regional water-table aquifer is postulated for Site 300. Preliminary analysis has led to an understanding of directions and depths of regional ground-water flow

  4. Yucca Mountain Project Site Atlas: Volume 1: Draft

    International Nuclear Information System (INIS)

    1988-10-01

    The Nevada Nuclear Waste Storage Investigations (NNWSI) Project Site Atlas is a reference document of field activities which have been, or are being, conducted by the US Department of Energy (DOE) to support investigations of Yucca Mountain as a potential site for an underground repository for high-level radioactive waste. These investigations, as well as future investigations, will yield geologic, geophysical, geochemical, geomechanical, hydrologic, volcanic, seismic, and environmental data necessary to characterize Yucca Mountain and its regional setting. This chapter summarizes the background of the NNWSI Project and the objective, scope, structure, and preparation of the Site Atlas. Chapter 2 describes in more detail the bibliography and map portfolio portions of the Atlas, which are presented in Chapter 4 and Volume 2, respectively. Chapter 3 describes how to use the Atlas. The objective of the Site Atlas is to create a management tool for the DOE Waste Management Project Office (WMPO) that will allow the WMPO to compile and disseminate information regarding the location of NNWSI Project field investigations, and document the permits acquired and the environmental, archaeological, and socioeconomic surveys conducted to support those investigations. The information contained in the Atlas will serve as a historical reference of site investigation field activities. A companion document to the Atlas is the NNWSI Project Surface Based Investigations Plan (SBIP)

  5. Yucca Mountain Site characterization project bibliography, January--June 1991

    International Nuclear Information System (INIS)

    1992-06-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Science and Technology Database from January 1, 1990, through December 31, 1991

  6. Final work plan: Expedited Site Characterization of the IES Industries, Inc., Site at Marshalltown, Iowa. Ames Expedited Site Characterization Project, Version 1.0

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-04

    The overall goal of the Ames Laboratory Expedited Site Characterization (ESC) project is to evaluate and promote both innovative and state-of-the-practice site characterization and/or monitoring technologies. This will be accomplished by fielding both types of technologies together in the context of an expedited site characterization. The first site will be at a former manufactured gas plant (FMGP) in Marshalltown, Iowa. The project will field three areas of technology: geophysical, analytical, and data fusion. Geophysical technologies are designed to understand the subsurface geology to help predict fate and transport of the target contaminants. Analytical technologies/methods are designed to detect and quantify the target contaminants. Data fusion technology consists of software systems designed to rapidly integrate or fuse all site information into a conceptual site model that then becomes the decision making tool for the site team to plan subsequent sampling activity. Not all of the contaminants present can be located at the action level. Polynuclear aromatic hydrocarbons (PAHs) are the signature organics associated with the coal tar activities that took place at the site. As a result, PAHs were selected as the target compounds. Screening analytical instruments and nonintrusive geophysical techniques will be fielded to qualitatively map the spatial contaminant distribution. Soil gas surveys, immunoassay testing (IMA), innovative optical techniques, and passive organic sorbent sensors will be deployed along with the geophysical methods. Gas chromatography/mass spectrometry (GC/MS) instruments and a cone penetrometer system equipped with a laser-induced fluorescence (LIF) probe will quantitatively map the action level edges of the PAH plume(s). Samples will be taken both by the cone penetrometer test system (CPT) and the Geoprobe {reg_sign} sampler system.

  7. Space Projects: Improvements Needed in Selecting Future Projects for Private Financing

    Science.gov (United States)

    1990-01-01

    The Office of Management and Budget (OMB) and NASA jointly selected seven projects for commercialization to reduce NASA's fiscal year 1990 budget request and to help achieve the goal of increasing private sector involvement in space. However, the efforts to privately finance these seven projects did not increase the commercial sector's involvement in space to the extent desired. The General Accounting Office (GAO) determined that the projects selected were not a fair test of the potential of increasing commercial investment in space at an acceptable cost to the government, primarily because the projects were not properly screened. That is, neither their suitability for commercialization nor the economic consequences of seeking private financing for them were adequately evaluated before selection. Evaluations and market tests done after selection showed that most of the projects were not viable candidates for private financing. GAO concluded that projects should not be removed from NASA's budget for commercial development until after careful screening has been done to determine whether adequate commercial demand exists, development risks are commercially acceptable and private financing is found or judged to be highly likely, and the cost effectiveness of such a decision is acceptable. Premature removal of projects from NASA's budget ultimately can cause project delays and increased costs when unsuccessful commercialization candidates must be returned to the budget. NASA also needs to ensure appropriate comparisons of government and private financing options for future commercialization projects.

  8. The Savannah River Site Replacement High Level Radioactive Waste Evaporator Project

    International Nuclear Information System (INIS)

    Brock Presgrove, S.

    1992-01-01

    The Replacement High Level Waste Evaporator Project was conceived in 1985 to reduce the volume of the high level radioactive waste currently stored at the DOE Savannah River Site Tank Farm. Process of the high level waste has been accomplished up to this time using Bent Tube type evaporators and therefore, that type evaporator was selected for this project. The Title I Design of the project was 70% completed in late 1990. The Department of Energy at that time hired an independent consulting firm to perform a complete review of the project. The DOE placed a STOP ORDER on purchasing the evaporator in January 1991. Essentially, no construction was to be done on the project until all findings and concerns dealing with the type and design of the evaporator are resolved. This report addresses two aspects of the DOE design review: Comparing the Bent Tube Evaporator with the Forced Circulation Evaporator; The design portion of the DOE Project Review - concentrated on the mechanical design properties of the evaporator. (author)

  9. 49 CFR 268.17 - Project selection criteria.

    Science.gov (United States)

    2010-10-01

    ... criteria will govern FRA's selection of projects to receive funding under the Maglev Deployment Program. (a... are to be expected in the United States. (4) The degree to which the project will augment a Maglev... development status of the Maglev technology selected by the applicant for the project. (c) Benefits for the...

  10. Early Site Permit Demonstration Program: Siting Guide, Site selection and evaluation criteria for an early site permit application. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-24

    In August 1991, the Joint Contractors came to agreement with Sandia National Laboratories (SNL) and the Department of Energy (DOE) on a workscope for the cost-shared Early Site Permit Demonstration Program. One task within the scope was the development of a guide for site selection criteria and procedures. A generic Siting Guide his been prepared that is a roadmap and tool for applicants to use developing detailed siting plans for their specific region of the country. The guide presents three fundamental principles that, if used, ensure a high degree of success for an ESP applicant. First, the site selection process should take into consideration environmentally diverse site locations within a given region of interest. Second, the process should contain appropriate opportunities for input from the public. Third, the process should be applied so that it is clearly reasonable to an impartial observer, based on appropriately selected criteria, including criteria which demonstrate that the site can host an advanced light water reactor (ALWR). The Siting Guide provides for a systematic, comprehensive site selection process in which three basic types of criteria (exclusionary, avoidance, and suitability) are presented via a four-step procedure. It provides a check list of the criteria for each one of these steps. Criteria are applied qualitatively, as well as presented numerically, within the guide. The applicant should use the generic guide as an exhaustive checklist, customizing the guide to his individual situation.

  11. Site Selection for the Salt Disposition Facility at the Savannah River Site

    International Nuclear Information System (INIS)

    Gladden, J.B.; Rueter, K.J.; Morin, J.P.

    2000-01-01

    A site selection study was conducted to identify a suitable location for the construction and operation of a new Salt Disposition Facility (SDF) at the Savannah River Site (SRS). The facility to be sited is a single processing facility and support buildings that could house either of three technology alternatives being developed by the High Level Waste Systems Engineering Team: Small Tank Tetraphenylborate Precipitation, Crystalline Silicotitanate Non-Elutable Ion Exchange or Caustic Side Solvent Extraction. A fourth alternative, Direct Disposal in grout, is not part of the site selection study because a location has been identified that is unique to this technology (i.e., Z-Area). Facility site selection at SRS is a formal, documented process that seeks to optimize siting of new facilities with respect to facility-specific engineering requirements, sensitive environmental resources, and applicable regulatory requirements. In this manner, the prime objectives of cost minimization, environmental protection, and regulatory compliance are achieved. The results from this geotechnical characterization indicated that continued consideration be given to Site B for the proposed SDF. Suitable topography, the lack of surface hydrology and floodplain issues, no significant groundwater contamination, the presence of minor soft zones along the northeast portion of footprint, and no apparent geological structure in the Gordon Aquitard support this recommendation

  12. Siting Study Framework and Survey Methodology for Marine and Hydrokinetic Energy Project in Offshore Southeast Florida

    Energy Technology Data Exchange (ETDEWEB)

    Vinick, Charles; Riccobono, Antonino, MS; Messing, Charles G., Ph.D.; Walker, Brian K., Ph.D.; Reed, John K., Ph.D.

    2012-02-28

    Dehlsen Associates, LLC was awarded a grant by the United States Department of Energy (DOE) Golden Field Office for a project titled 'Siting Study Framework and Survey Methodology for Marine and Hydrokinetic Energy Project in Offshore Southeast Florida,' corresponding to DOE Grant Award Number DE-EE0002655 resulting from DOE funding Opportunity Announcement Number DE-FOA-0000069 for Topic Area 2, and it is referred to herein as 'the project.' The purpose of the project was to enhance the certainty of the survey requirements and regulatory review processes for the purpose of reducing the time, efforts, and costs associated with initial siting efforts of marine and hydrokinetic energy conversion facilities that may be proposed in the Atlantic Ocean offshore Southeast Florida. To secure early input from agencies, protocols were developed for collecting baseline geophysical information and benthic habitat data that can be used by project developers and regulators to make decisions early in the process of determining project location (i.e., the siting process) that avoid or minimize adverse impacts to sensitive marine benthic habitat. It is presumed that such an approach will help facilitate the licensing process for hydrokinetic and other ocean renewable energy projects within the study area and will assist in clarifying the baseline environmental data requirements described in the U.S. Department of the Interior Bureau of Ocean Energy Management, Regulation and Enforcement (formerly Minerals Management Service) final regulations on offshore renewable energy (30 Code of Federal Regulations 285, published April 29, 2009). Because projects generally seek to avoid or minimize impacts to sensitive marine habitats, it was not the intent of this project to investigate areas that did not appear suitable for the siting of ocean renewable energy projects. Rather, a two-tiered approach was designed with the first step consisting of gaining overall insight

  13. Site selection under the underground geologic store plan. Procedures of selecting underground geologic stores as disputed by society, science, and politics. Site selection rules

    International Nuclear Information System (INIS)

    Aebersold, M.

    2008-01-01

    The new Nuclear Power Act and the Nuclear Power Ordinance of 2005 are used in Switzerland to select a site of an underground geologic store for radioactive waste in a substantive planning procedure. The ''Underground Geologic Store Substantive Plan'' is to ensure the possibility to build underground geologic stores in an independent, transparent and fair procedure. The Federal Office for Energy (BFE) is the agency responsible for this procedure. The ''Underground Geologic Store'' Substantive Plan comprises these principles: - The long term protection of people and the environment enjoys priority. Aspects of regional planning, economics and society are of secondary importance. - Site selection is based on the waste volumes arising from the five nuclear power plants currently existing in Switzerland. The Substantive Plan is no precedent for or against future nuclear power plants. - A transparent and fair procedure is an indispensable prerequisite for achieving the objectives of a Substantive Plan, i.e., finding accepted sites for underground geologic stores. The Underground Geologic Stores Substantive Plan is arranged in two parts, a conceptual part defining the rules of the selection process, and an implementation part documenting the selection process step by step and, in the end, naming specific sites of underground geologic stores in Switzerland. The objective is to be able to commission underground geologic stores in 25 or 35 years' time. In principle, 2 sites are envisaged, one for low and intermediate level waste, and one for high level waste. The Swiss Federal Council approved the conceptual part on April 2, 2008. This marks the beginning of the implementation phase and the site selection process proper. (orig.)

  14. Site selection - siting of the final repository for spent nuclear fuel

    International Nuclear Information System (INIS)

    2011-03-01

    SKB has selected Forsmark as the site for the final repository for spent nuclear fuel. The site selection is the end result of an extensive siting process that began in the early 1990s. The strategy and plan for the work was based on experience from investigations and development work over a period of more than ten years prior to then. This document describes the siting work and SKB's choice of site for the final repository. It also presents the information on which the choice was based and the reasons for the decisions made along the way. The document comprises Appendix PV to applications under the Nuclear Activities Act and the Environmental Code for licences to build and operate an encapsulation plant adjacent to the central interim storage facility for spent nuclear fuel in Oskarshamn, and to build and operate a final repository for spent nuclear fuel in Forsmark in Oesthammar Municipality

  15. Site selection - siting of the final repository for spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    2011-03-15

    SKB has selected Forsmark as the site for the final repository for spent nuclear fuel. The site selection is the end result of an extensive siting process that began in the early 1990s. The strategy and plan for the work was based on experience from investigations and development work over a period of more than ten years prior to then. This document describes the siting work and SKB's choice of site for the final repository. It also presents the information on which the choice was based and the reasons for the decisions made along the way. The document comprises Appendix PV to applications under the Nuclear Activities Act and the Environmental Code for licences to build and operate an encapsulation plant adjacent to the central interim storage facility for spent nuclear fuel in Oskarshamn, and to build and operate a final repository for spent nuclear fuel in Forsmark in Oesthammar Municipality

  16. A fuzzy hybrid approach for project manager selection

    Directory of Open Access Journals (Sweden)

    Ahmad Jafarnejad Chaghooshi

    2016-09-01

    Full Text Available Suitable project manager has a significant impact on successful accomplishment of the project. Managers should possess such skills in order to effectively cope with the competition. In this respect, selecting managers based on their skills can lead to a competitive advantage towards the achievement of organizational goals. selection of the suitable project manager can be viewed as a multi-criteria decision making (MCDM problem and an extensive evaluation of criteria, such as Technical skills, experience skills, Personal qualities and the related criteria must be considered in the selection process of project manager. The fuzzy set theory and MCDM methods appears as an essential tools to provide a decision framework that incorporates imprecise judgments and multi criteria nature of project manager selection process inherent in this process. This paper proposes the joint use of the Fuzzy DEMATEL (FDEMATEL and Fuzzy VIKOR methods for the decision-making process of selecting the most suitable managers for projects. First, with the opinions of the senior managers based on project management competency model (ICB-IPMA, all the criteria required for the selection are gathered. Then the FDEMATEL method is used to prioritize the importance of various criteria and FVIKOR used to rank the alternatives in a preferred order to select the best project managers from a number of alternatives. Next, a real case study used to illustrate the process of the proposed method. Finally, some conclusions are discussed at the end of this study.

  17. Area 5 Site characterization project report, FY 1994

    International Nuclear Information System (INIS)

    Albright, W.; Tyler, S.; Chapman, J.; Miller, M.; Estrella, R.

    1994-09-01

    The Area 5 Site Characterization Project is designed to determine the suitability of the Radioactive Waste Management Site (RWMS) for disposal of low-level waste (LLW), mixed waste (MW) and transuranic waste (TRU). The Desert Research institute (DRI) has conducted this study for the Area 5 Site Characterization Project for the US Department of Energy, Nevada Operations Office (DOE/NV), Waste Management Division (WMD). The purpose of DRI's Area 5 Site Characterization Project is to characterize important properties of the upper vadose zone which influence infiltration and redistribution of water and transport of solutes as well as to characterize the water quality and hydrologic conditions of the uppermost aquifer. This report describes methods and presents a summary of all data and results from laboratory physical and chemical testing from borehole samples through September 1994. DRI laboratories performed soil water content, soil water potential, soil bulk density, and soil water extract isotope analyses

  18. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Down-selection of one or more Maglev projects for... Procedures For Financial Assistance § 268.21 Down-selection of one or more Maglev projects for further study... completion of Phase III of the Maglev Deployment Program, FRA will down-select one or more projects to...

  19. Nuclear power plant site selection: a case study

    International Nuclear Information System (INIS)

    Lugasi, Y.; Mehrez, A.; Sinuany-Stern, Z.

    1985-01-01

    Selecting the site for a nuclear power plant involves the evaluation of numerous criteria and the professional judgment of various experts. The Israel Atomic Energy Commission has been concerned with the problem of selecting a site for a nuclear power station. Previous studies have been performed by the commission to identify potential sites. There were initial screenings where potential sites were chosen according to various minimal criteria and international standards. Only sites that met all the criteria were chosen. A study was made to find the most preferred site among the potential sites that met all the criteria. Two mathematical approaches were used: Keeney's multiattribute utility function and Saaty's eigenvalue prioritization technique. Both models ranked the same site as the most desirable; however, the models differed in their ranking of the other sites

  20. Geological criteria for site selection of an LILW radioactive waste repository in the Philippines

    International Nuclear Information System (INIS)

    Aurelio, Mario; Taguibao, Kristine Joy; Vargas, Edmundo; Palattao, Maria Visitacion; Reyes, Rolando; Nohay, Carl; Singayan, Alfonso

    2013-01-01

    In the selection of sites for disposal facilities involving low- and intermediate-level radioactive waste (LILW), International Atomic Energy Agency (IAEA) recommendations require that 'the region in which the site is located shall be such that significant tectonic and surface processes are not expected to occur with an intensity that would compromise the required isolation capability of the repository'. Evaluating the appropriateness of a site therefore requires a deep understanding of the geological and tectonic setting of the area. The Philippines sits in a tectonically active region frequented by earthquakes and volcanic activity. Its highly variable morphology coupled with its location along the typhoon corridor in the west Pacific region subjects the country to surface processes often manifested in the form of landslides. The Philippine LILW near surface repository project site is located on the north eastern sector of the Island of Luzon in northern Philippines. This island is surrounded by active subduction trenches; to the east by the East Luzon Trough and to the west by the Manila Trench. The island is also traversed by several branches of the Philippine Fault System. The Philippine LILW repository project is located more than 100 km away from any of these major active fault systems. In the near field, the project site is located less than 10 km from a minor fault (Dummon River Fault) and more than 40 km away from a volcanic edifice (Mt. Caguas). This paper presents an analysis of the potential hazards that these active tectonic features may pose to the project site. The assessment of such geologic hazards is imperative in the characterization of the site and a crucial input in the design and safety assessment of the repository. (authors)

  1. Geological criteria for site selection of an LILW radioactive waste repository in the Philippines

    Energy Technology Data Exchange (ETDEWEB)

    Aurelio, Mario; Taguibao, Kristine Joy [National Institute of Geological Sciences, University of the Philippines, Quezon City (Philippines); Vargas, Edmundo; Palattao, Maria Visitacion; Reyes, Rolando; Nohay, Carl; Singayan, Alfonso [Philippine Nuclear Research Institute, Department of Science and Technology, Quezon City (Philippines)

    2013-07-01

    In the selection of sites for disposal facilities involving low- and intermediate-level radioactive waste (LILW), International Atomic Energy Agency (IAEA) recommendations require that 'the region in which the site is located shall be such that significant tectonic and surface processes are not expected to occur with an intensity that would compromise the required isolation capability of the repository'. Evaluating the appropriateness of a site therefore requires a deep understanding of the geological and tectonic setting of the area. The Philippines sits in a tectonically active region frequented by earthquakes and volcanic activity. Its highly variable morphology coupled with its location along the typhoon corridor in the west Pacific region subjects the country to surface processes often manifested in the form of landslides. The Philippine LILW near surface repository project site is located on the north eastern sector of the Island of Luzon in northern Philippines. This island is surrounded by active subduction trenches; to the east by the East Luzon Trough and to the west by the Manila Trench. The island is also traversed by several branches of the Philippine Fault System. The Philippine LILW repository project is located more than 100 km away from any of these major active fault systems. In the near field, the project site is located less than 10 km from a minor fault (Dummon River Fault) and more than 40 km away from a volcanic edifice (Mt. Caguas). This paper presents an analysis of the potential hazards that these active tectonic features may pose to the project site. The assessment of such geologic hazards is imperative in the characterization of the site and a crucial input in the design and safety assessment of the repository. (authors)

  2. Site observational work plan for the UMTRA Project site at Tuba City, Arizona

    International Nuclear Information System (INIS)

    1994-09-01

    The requirements for ground water compliance for Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Tuba City, Arizona, site, are found in the Uranium Mill Tailings Radiation Control Act; Subparts B and C of the U.S. Environmental Protection Agency's Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR 192 (1994)), and the associated proposed 1987 standards (52 FR 36000). During the surface remedial action, an estimated 1,400,000 cubic yards (yd 3 ) (1,100,000 cubic meters [m 3 ]) of uranium mill tailings and other contaminated materials were consolidated and stabilized in place in an unlined disposal cell covering 50 acres (20 hectares). The surface remedial action was completed in April 1990. Ground water beneath the Tuba City site was contaminated by subsurface migration of water from uranium ore processing activities. The main source of contaminants was water from the tailings piles that began in 1956 when the mill opened and ended in 1966 when the mill closed. 800,000 tons (725,000 tonnes) of uranium ore were processed onsite over a 10-year period. The wet tailings remaining after processing were placed as a slurry in three piles at the site. Water from these tailings then seeped into the ground and migrated downward to the ground water. The Tuba City site is currently in a post-stabilization, prelicensing status. The site is expected to remain in this status until licensed by the U.S. Nuclear Regulatory Commission (NRC) for long-term surveillance and maintenance. The preliminary ground water compliance strategy at the Tuba City site is active remediation-specific technology to be evaluated is in situ bioremediation. This selection was made because of the potential ability of bioremediation to reduce concentrations to lower levels than a conventional extraction system and to minimize disturbance of the water resource

  3. Species-specific spatial characteristics in reserve site selection

    NARCIS (Netherlands)

    Groeneveld, R.A.

    2010-01-01

    This paper addresses the problem of selecting reserve sites cost-effectively, taking into account the mobility and habitat area requirements of each species. Many reserve site selection problems are analyzed in mixed-integer linear programming (MILP) models due to the mathematical solvers available

  4. The Added Value of the Project Selection Process

    Directory of Open Access Journals (Sweden)

    Adel Oueslati

    2016-06-01

    Full Text Available The project selection process comes in the first stage of the overall project management life cycle. It does have a very important impact on organization success. The present paper provides defi nitions of the basic concepts and tools related to the project selection process. It aims to stress the added value of this process for the entire organization success. The mastery of the project selection process is the right way for any organization to ensure that it will do the right project with the right resources at the right time and within the right priorities

  5. RELIABILITY AND ACCURACY ASSESSMENT OF INVASIVE AND NON- INVASIVE SEISMIC METHODS FOR SITE CHARACTERIZATION: FEEDBACK FROM THE INTERPACIFIC PROJECT

    OpenAIRE

    Garofalo , F.; Foti , S.; Hollender , F.; Bard , P.-Y.; Cornou , C.; Cox , B.R.; Dechamp , A.; Ohrnberger , M.; Sicilia , D.; Vergniault , C.

    2017-01-01

    International audience; The InterPacific project (Intercomparison of methods for site parameter and velocity profile characterization) aims to assess the reliability of seismic site characterization methods (borehole and surface wave methods) used for estimating shear wave velocity (VS) profiles and other related parameters (e.g., VS30). Three sites, representative of different geological conditions relevant for the evaluation of seismic site response effects, have been selected: (1) a hard r...

  6. Site Selection for Hvdc Ground Electrodes

    Science.gov (United States)

    Freire, P. F.; Pereira, S. Y.

    2014-12-01

    High-Voltage Direct Current (HVDC) transmission systems are composed of a bipole transmission line with a converter substation at each end. Each substation may be equipped with a HVDC ground electrode, which is a wide area (up to 1 km Ø) and deep (from 3 to 100m) electrical grounding. When in normal operation, the ground electrode will dissipate in the soil the unbalance of the bipole (~1.5% of the rated current). When in monopolar operation with ground return, the HVDC electrode will inject in the soil the nominal pole continuous current, of about 2000 to 3000 Amperes, continuously for a period up to a few hours. HVDC ground electrodes site selection is a work based on extensive geophysical and geological surveys, in order to attend the desired design requirements established for the electrodes, considering both its operational conditions (maximum soil temperature, working life, local soil voltage gradients etc.) and the interference effects on the installations located up to 50 km away. This poster presents the geophysical investigations conducted primarily for the electrodes site selection, and subsequently for the development of the crust resistivity model, which will be used for the interference studies. A preliminary site selection is conducted, based on general geographical and geological criteria. Subsequently, the geology of each chosen area is surveyed in detail, by means of electromagnetic/electrical geophysical techniques, such as magnetotelluric (deep), TDEM (near-surface) and electroresistivity (shallow). Other complementary geologic and geotechnical surveys are conducted, such as wells drilling (for geotechnical characterization, measurement of the water table depth and water flow, and electromagnetic profiling), and soil and water sampling (for measurement of thermal parameters and evaluation of electrosmosis risk). The site evaluation is a dynamic process along the surveys, and some sites will be discarded. For the two or three final sites, the

  7. Site quality management of engineering projects

    International Nuclear Information System (INIS)

    Jiang Yiqun

    2008-01-01

    Site quality management of an engineering project of NPIC was introduced in this paper. Requirements on organization and management, interfaces, and management of interior and exterior communication were put forward, by description of quality planning, process management, process monitoring and summarizing for the engineering projects. By the management of personnel, specifications and procedures, and the control of equipment, material and work surroundings, not only the safety is ensured, but also the quality and schedule of the engineering project were guaranteed, and so the expected quality goals were achieved. (author)

  8. Analysis Methodology for Optimal Selection of Ground Station Site in Space Missions

    Science.gov (United States)

    Nieves-Chinchilla, J.; Farjas, M.; Martínez, R.

    2013-12-01

    Optimization of ground station sites is especially important in complex missions that include several small satellites (clusters or constellations) such as the QB50 project, where one ground station would be able to track several spatial vehicles, even simultaneously. In this regard the design of the communication system has to carefully take into account the ground station site and relevant signal phenomena, depending on the frequency band. To propose the optimal location of the ground station, these aspects become even more relevant to establish a trusted communication link due to the ground segment site in urban areas and/or selection of low orbits for the space segment. In addition, updated cartography with high resolution data of the location and its surroundings help to develop recommendations in the design of its location for spatial vehicles tracking and hence to improve effectiveness. The objectives of this analysis methodology are: completion of cartographic information, modelling the obstacles that hinder communication between the ground and space segment and representation in the generated 3D scene of the degree of impairment in the signal/noise of the phenomena that interferes with communication. The integration of new technologies of geographic data capture, such as 3D Laser Scan, determine that increased optimization of the antenna elevation mask, in its AOS and LOS azimuths along the horizon visible, maximizes visibility time with spatial vehicles. Furthermore, from the three-dimensional cloud of points captured, specific information is selected and, using 3D modeling techniques, the 3D scene of the antenna location site and surroundings is generated. The resulting 3D model evidences nearby obstacles related to the cartographic conditions such as mountain formations and buildings, and any additional obstacles that interfere with the operational quality of the antenna (other antennas and electronic devices that emit or receive in the same bandwidth

  9. Hanford Site Composite Analysis Technical Approach Description: Radionuclide Inventory and Waste Site Selection Process.

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, Will E.; Mehta, Sunil

    2017-09-13

    The updated Hanford Site Composite Analysis will provide an all-pathways dose projection to a hypothetical future member of the public from all planned low-level radioactive waste disposal facilities and potential contributions from all other projected end-state sources of radioactive material left at Hanford following site closure. Its primary purpose is to support the decision-making process of the U.S. Department of Energy (DOE) under DOE O 435.1-1, Radioactive Waste Management (DOE, 2001), related to managing low-level waste disposal facilities at the Hanford Site.

  10. The alternative site selection procedure as covered in the report by the Repository Site Selection Procedures Working Group

    International Nuclear Information System (INIS)

    Brenner, M.

    2005-01-01

    The 2002 Act on the Regulated Termination of the Use of Nuclear Power for Industrial Electricity Generation declared Germany's opting out of the peaceful uses of nuclear power. The problem of the permanent management of radioactive residues is becoming more and more important also in the light of that political decision. At the present time, there are no repositories offering the waste management capacities required. Such facilities need to be created. At the present stage, eligible repository sites are the Konrad mine, a former iron ore mine near Salzgitter, and the Gorleben salt dome. While the fate of the Konrad mine as a repository for waste generating negligible amounts of heat continues to be uncertain, despite a plan approval decision of June 2002, the Gorleben repository is still in the planning phase, at present in a dormant state, so to speak. The federal government expressed doubt about the suitability of the Gorleben site. Against this backdrop, the Federal Ministry for the Environment, Nature Conservation, and Nuclear Safety in February 1999 established AkEnd, the Working Group on Repository Site Selection Procedures. The Group was charged with developing, based on sound scientific criteria, a transparent site selection procedure in order to facilitate the search for repository sites. The Working Group presented its final report in December 2002 after approximately four years of work. The Group's proposals about alternative site selection procedures are explained in detail and, above all, reviewed critically. (orig.)

  11. The ENTRIA project. Selected disciplinary and interdisciplinary research topics

    International Nuclear Information System (INIS)

    Roehlig, Klaus-Juergen; Hocke, Peter; Walther, Clemens

    2015-01-01

    ENTRIA (''Disposal Options for Radioactive Residues: Interdisciplinary Analyses and Development of Evaluation Principles'', www.entria.de) is a joint research project carried out by twelve departments and institutes from German universities and major research institutions and one partner from Switzerland. It is financed by the German Ministry of Education and Research (BMBF). Scientists representing natural sciences, civil engineering, philosophy, law, social and political sciences, and technology assessment carry out disciplinary and interdisciplinary research addressing three options to manage especially high-level radioactive waste: - Final disposal in deep geological formations without any arrangements for retrieval, - disposal in deep geological formations with arrangements for monitoring and retrieval, and - (prolonged) surface (or near-surface) storage. In the paper, the following selected research topics - both disciplinary and interdisciplinary - are briefly introduced in order to provide an impression of the project scope: - Surface storage, - reference concepts for emplacement in deep geological formations with retrievability and monitoring, - radiation exposure and justification of measures, - interdisciplinary perspectives on dose limits, - comparative studies on nuclear waste governance, - nuclear waste governance in Switzerland, - public involvement and the German Site Selection Act, and - citizens' jury.

  12. Salt Repository Project site study plan for seismographic monitoring: Revision 1

    International Nuclear Information System (INIS)

    1987-01-01

    This site study plan describes the seismographic monitoring activities to be conducted during the early stages of Site Characterization at the Deaf Smith County site, Texas. The field programs has been designed to provide data useful in addressing information/data needs resulting from Federal/State/local regulatory requirements and repository program requirements. Sixteen new and three relocated seismographic stations will be added to the now existing network of 13 stations for a total of 32 stations in the network. The areal extent is being expanded and selected regions covered more densely to provide more accurate monitoring and location of microearthquakes. More sophisticated instruments are being used at selected locations to allow for more detailed analysis. A few seismographs are being installed at depth to provide a limited 3-D monitoring network in the area of the repository. The Salt Repository Project (SRP) Networks specify the schedule under which the program will operate. The Technique Field Services Contractor (TFSC) is responsible for conducting the field program. Data will be handled and reported in accordance with established SRP procedures. A quality assurance program will be utilized to assure that activities affecting quality are performed correctly and that appropriate documentation is maintained. 32 refs., 11 figs., 4 tabs

  13. Site observational work plan for the UMTRA Project site at Riverton, Wyoming

    International Nuclear Information System (INIS)

    1994-09-01

    The site observational work plan (SOWP) for the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the first document for the UMTRA Ground Water Project to address site-specific activities to meet compliance with the U.S. Environmental Protection Agency (EPA) proposed ground water standards (52 FR 36000 (1987)). In support of the activities the regulatory framework and drivers are presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. A combination of the two compliance strategies that will be recommended for this site are no remediation with the application of alternate concentration levels (ACL) and natural flushing in conjunction with institutional controls. ACLs are to be applied to constituents that occur at concentrations above background levels but which are essential nutrients and occur within nutritional ranges and/or have very low toxicity and high dietary intake rates compared to the levels detected in the ground water. The essential premise of natural flushing is that ground water movement and natural attenuation processes will reduce the detected contamination to background levels within 1 00 years. These two recommended compliance strategies were evaluated by applying Riverton site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement. There are three aquifers beneath the site: a surficial unconfined aquifer, a middle semiconfined aquifer, and a deeper confined aquifer. The milling-related contamination at the site has affected both the surficial and semiconfined aquifers, although the leaky shale aquifers separating these units limits the downward migration of contamination into the semiconfined aquifer. A shale aquitard separates the semiconfined aquifer from the underlying confined aquifer which has not been contaminated by milling-related constituents

  14. Radioactive waste repository site selection in the Republic of Slovenia

    International Nuclear Information System (INIS)

    Jeran, M.

    1992-01-01

    The report shows the procedure for the low and intermediate level radwaste (LLW and ILW) repository site selection and the work performed up to the present. The procedure for the repository site selection is divided into four steps. In the first step the unsuitable areas are excluded by taking into consideration the rough exclusion criteria. In the second step, the remaining suitable areas are screened to identify the potential sites with respect to preference criteria. In the third step three to five candidate sites will be assessed and selected among the potential sites. In the final, the fourth step, detailed site investigation and confirmation of one or two most suitable sites will follow. In Slovenia the 1st and the 2nd step of site selection have been completed, while step 3 is now in its final stage. (author) [sl

  15. Selection of projects in the regional energy planning

    International Nuclear Information System (INIS)

    Ramirez P, R.; Navas M, F.

    1993-01-01

    The processes of regional energy planning have changed vastly in the last years and it will continue changing in the future for the new norm of the State. This work tries to show the use of systematic tools in the selection of regional energy projects. It discusses a methodology of selection of projects based on a multivariate technical. It is applied in the Southwestern region of Colombia and both selection and priority results are obtained. The designed methodology allows to make the selection of projects in an automatic way with a software designed for such an end. In the case of Southwestern it arrives to a briefcase of projects for an energy plan and made for other races

  16. Use of DOE site selection criteria for screening low-level waste disposal sites on the Oak Ridge Reservation

    International Nuclear Information System (INIS)

    Lee, D.W.; Ketelle, R.H.; Stinton, L.H.

    1983-09-01

    The proposed Department of Energy (DOE) site selection criteria were applied to the Oak Ridge Reservation, and the application was evaluated to determine the criteria's usefulness in the selection of a low-level waste disposal site. The application of the criteria required the development of a methodology to provide a framework for evaluation. The methodology is composed of site screening and site characterization stages. The site screening stage relies on reconnaissance data to identify a preferred site capable of satisfying the site selection criteria. The site characterization stage relies on a detailed site investigation to determine site acceptability. The site selection criteria were applied to the DOE Oak Ridge Reservation through the site screening stage. Results of this application were similar to those of a previous siting study on the Oak Ridge Reservation. The DOE site selection criteria when coupled with the methodology that was developed were easily applied and would be adaptable to any region of interest

  17. Yucca Mountain Site characterization project bibliography, January--June 1991

    International Nuclear Information System (INIS)

    Lorenz, J.J.; Stephan, P.M.

    1991-09-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Energy Science and Technology Database from January 1991 through June 1991. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it

  18. Yucca Mountain Site Characterization Project bibliography, January--June 1992

    International Nuclear Information System (INIS)

    1992-01-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Energy Science and Technology Database from January 1, 1993, through June 30, 1993. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it

  19. Yucca Mountain Site Characterization Project Bibliography, July--December 1990

    International Nuclear Information System (INIS)

    1991-05-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountains Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Energy Science and Technology Database from July 1990 through December 1990. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers and articles are included in the sponsoring organizations list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it

  20. Yucca Mountain Site characterization project bibliography, January--June 1992

    International Nuclear Information System (INIS)

    1992-09-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Energy Science and Technology Database from January 1, 1992, through June 30, 1992. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor resorts, papers, and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it

  1. Combinatorial Optimization in Project Selection Using Genetic Algorithm

    Science.gov (United States)

    Dewi, Sari; Sawaluddin

    2018-01-01

    This paper discusses the problem of project selection in the presence of two objective functions that maximize profit and minimize cost and the existence of some limitations is limited resources availability and time available so that there is need allocation of resources in each project. These resources are human resources, machine resources, raw material resources. This is treated as a consideration to not exceed the budget that has been determined. So that can be formulated mathematics for objective function (multi-objective) with boundaries that fulfilled. To assist the project selection process, a multi-objective combinatorial optimization approach is used to obtain an optimal solution for the selection of the right project. It then described a multi-objective method of genetic algorithm as one method of multi-objective combinatorial optimization approach to simplify the project selection process in a large scope.

  2. Project Selection for NASA's R&D Programs

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of NASA s Research and Development (R&D) programs is to provide advanced human support technologies for the Exploration Systems Mission Directorate (ESMD). The new technologies must be sufficiently attractive and proven to be selectable for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are likely options for flight. The R&D programs must select an array of technology development projects, manage them, and either terminate or continue them, so as to maximize the delivered number of potentially usable advanced human support technologies. This paper proposes an effective project selection methodology to help manage NASA R&D project portfolios.

  3. The SKI SITE-94 project approach to analyzing confidence in site-specific data

    International Nuclear Information System (INIS)

    Dverstorp, B.; Andersson, J.

    1995-01-01

    The ongoing SKI SITE-94 project is a fully integrated performance assessment based on a hypothetical repository at 500 m depth in crystalline rock. One main objective of the project is to develop a methodology for incorporating data from a site characterization into the performance assessment. The hypothetical repository is located at SKB's Hard Rock Laboratory at Aspo in south-eastern Sweden. The site evaluation in SITE-94 uses data from the pre-excavation phase that comprised measurements performed on the ground and in boreholes, including cross-hole hydraulic and tracer experiments. Uncertainties related to measurement technique, equipment and methods for interpretation were evaluated through a critical review of geohydraulic measurement methods and a complete re-evaluation of the hydraulic packer tests using the generalised radial flow (GRF) theory. Groundwater chemistry samples were analyzed for representativeness and sampling errors. A wide range of site models within geology, hydrogeology, geochemistry and rock mechanics has been developed and tested with the site characterization data. (authors). 10 refs., 3 figs., 2 tabs

  4. Selection of the Mars Science Laboratory landing site

    Science.gov (United States)

    Golombek, M.; Grant, J.; Kipp, D.; Vasavada, A.; Kirk, Randolph L.; Fergason, Robin L.; Bellutta, P.; Calef, F.; Larsen, K.; Katayama, Y.; Huertas, A.; Beyer, R.; Chen, A.; Parker, T.; Pollard, B.; Lee, S.; Hoover, R.; Sladek, H.; Grotzinger, J.; Welch, R.; Dobrea, E. Noe; Michalski, J.; Watkins, M.

    2012-01-01

    The selection of Gale crater as the Mars Science Laboratory landing site took over five years, involved broad participation of the science community via five open workshops, and narrowed an initial >50 sites (25 by 20 km) to four finalists (Eberswalde, Gale, Holden and Mawrth) based on science and safety. Engineering constraints important to the selection included: (1) latitude (±30°) for thermal management of the rover and instruments, (2) elevation (surface that is safe for landing and roving and not dominated by fine-grained dust. Science criteria important for the selection include the ability to assess past habitable environments, which include diversity, context, and biosignature (including organics) preservation. Sites were evaluated in detail using targeted data from instruments on all active orbiters, and especially Mars Reconnaissance Orbiter. All of the final four sites have layered sedimentary rocks with spectral evidence for phyllosilicates that clearly address the science objectives of the mission. Sophisticated entry, descent and landing simulations that include detailed information on all of the engineering constraints indicate all of the final four sites are safe for landing. Evaluation of the traversabilty of the landing sites and target “go to” areas outside of the ellipse using slope and material properties information indicates that all are trafficable and “go to” sites can be accessed within the lifetime of the mission. In the final selection, Gale crater was favored over Eberswalde based on its greater diversity and potential habitability.

  5. Site-selective 13C labeling of proteins using erythrose

    International Nuclear Information System (INIS)

    Weininger, Ulrich

    2017-01-01

    NMR-spectroscopy enables unique experimental studies on protein dynamics at atomic resolution. In order to obtain a full atom view on protein dynamics, and to study specific local processes like ring-flips, proton-transfer, or tautomerization, one has to perform studies on amino-acid side chains. A key requirement for these studies is site-selective labeling with 13 C and/or 1 H, which is achieved in the most general way by using site-selectively 13 C-enriched glucose (1- and 2- 13 C) as the carbon source in bacterial expression systems. Using this strategy, multiple sites in side chains, including aromatics, become site-selectively labeled and suitable for relaxation studies. Here we systematically investigate the use of site-selectively 13 C-enriched erythrose (1-, 2-, 3- and 4- 13 C) as a suitable precursor for 13 C labeled aromatic side chains. We quantify 13 C incorporation in nearly all sites in all 20 amino acids and compare the results to glucose based labeling. In general the erythrose approach results in more selective labeling. While there is only a minor gain for phenylalanine and tyrosine side-chains, the 13 C incorporation level for tryptophan is at least doubled. Additionally, the Phe ζ and Trp η2 positions become labeled. In the aliphatic side chains, labeling using erythrose yields isolated 13 C labels for certain positions, like Ile β and His β, making these sites suitable for dynamics studies. Using erythrose instead of glucose as a source for site-selective 13 C labeling enables unique or superior labeling for certain positions and is thereby expanding the toolbox for customized isotope labeling of amino-acid side-chains.

  6. Siting and early-stage project management of nuclear power plant

    International Nuclear Information System (INIS)

    Wang Kai; Li Guojin

    2013-01-01

    In this paper, difficulties and challenges facing in siting of nuclear power plant after Fukushima nuclear accident is introduced. The key points for siting are analyzed. The site characteristics related to nuclear safety and the evaluated methods are discussed. From project management perspective, main procedures and key points for the early-stage of a nuclear power project are described. (authors)

  7. Site selection report basalt waste isolation program near-surface test facility

    International Nuclear Information System (INIS)

    Sharpe, S.D.

    1978-01-01

    A site selection committee was established to review the information gathered on potential sites and to select a site for the Near-Surface Test Facility Phase I. A decision was made to use a site on the north face of Gable Mountain located on the Hanford Site. This site provided convenient access to the Pomona Basalt Flow. This flow was selected for use at this site because it exhibited the characteristics established in the primary criteria. These criteria were: the flows thickness; its dryness; its nearness to the surface; and, its similarities to basalt units which are candidates for the repository. After the selection of the Near-Surface Test Facility Phase I Site, the need arose for an additional facility to demonstrate safe handling, storage techniques, and the physical effects of radioactive materials on an in situ basalt formation. The committee reviewed the sites selected for Phase I and chose the same site for locating Phase II of the Near-Surface Test Facility

  8. Quality of data used in site selection

    International Nuclear Information System (INIS)

    Delvin, W.L.

    1986-01-01

    The selection of sites for nuclear waste repositories requires an investigative effort to characterize potential sites with regard to geologic properties and environmental considerations. Such investigations generate scientific and engineering data through the experimental testing and evaluation of geologic and environmental materials and through sampling and analysis of those materials. Data generated for site selection must be correct, defendable, and suitable for their intended use; they must have quality. Five quality characteristics are defined and practices followed by scientists and engineers producing data have been grouped into seven categories called quality guides. These are presented in the paper and the relationship between the guides (practices) and the five quality characteristics is shown

  9. Site Observational Work Plan for the UMTRA project site at Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1995-02-01

    Ground water compliance for the Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Ambrosia Lake, New Mexico, site, is governed by the Uranium Mills Tailings Radiation Control Act (42 USC section 7901 et seq.) and the U.S. Environmental Protection Agency's Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR Part 192; 60 FR 2854). The EPA standards describe specific conditions for which the U.S. Department of Energy (DOE) may apply for supplemental standards for contaminated ground water rather than meeting background levels or numerical standards. To achieve compliance with Subpart A of the EPA standards the residual radioactive materials are currently being consolidated on the site by the DOE in a disposal cell, isolating them from direct human or ecological contact and further dispersion into the environment. Completion of the disposal cell is scheduled for early 1995. An environmental assessment and a Finding of No Significant Impact (FONSI) were completed in 1987. Concurrence with the UMTRA Surface Project Ambrosia Lake remedial action plan (RAP) was granted by the U.S. Nuclear Regulatory Commission (NRC) and state of New Mexico in 1990. The DOE deferred compliance with Subpart B of the EPA standards in the Surface Project RAP. This site observational work plan (SOWP) is the first document to address ground water compliance under Subpart B at the Ambrosia Lake site. The Ambrosia Lake UMTRA Project site is within the Grants Mineral Belt and was one of numerous uranium mills supplied by many local mines. Ground water contamination at the site occurred as a result of uranium mill operations. Contamination of ground water resulted from discharge of waste water, infiltration of water through the tailings pile, hydraulic placement of mill tailings in nearby mines, and water pumped from mine shafts

  10. UMTRA [Uranium Mill Tailings Remedial Action] Project site management manual

    International Nuclear Information System (INIS)

    1990-10-01

    The purpose of this manual is to summarize the organizational interfaces and the technical approach used to manage the planning, design development, National Environmental Policy Act (NEPA) compliance, engineering, and remedial action required to stabilize and control the designated Uranium Mill Tailings Remedial Action (UMTRA) Project sites. This manual describes the Project's objective, participants' roles and responsibilities, technical approach for accomplishing the objective, and planning and managerial controls to be used in performing the site work. The narrative follows the flow of activities depicted in Figure 1.1, which provides the typical sequence of key Project activities. A list of acronyms used is presented at the end of the manual. The comparable manual for UMTRA Project vicinity properties is the ''Vicinity Properties Management and Implementation Manual'' (VPMIM) (UMTRA-DOE/AL-050601). Together, the two manuals cover the remedial action activities associated with UMTRA Project sites. The UMTRA Project's objective is to stabilize and control the uranium mill tailings, vicinity property materials, and other residual radioactive materials at the designated sites (Figure 1.2) in a safe and environmentally sound manner in order to minimize radiation health hazards to the public. 26 figs., 6 tabs

  11. OSU TOMF Program Site Selection and Preliminary Concept Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Spadling, Steve [Oklahoma State Univ., Stillwater, OK (United States)

    2012-05-10

    The purpose of this report is to confirm the programmatic requirements for the new facilities, identify the most appropriate project site, and develop preliminary site and building concepts that successfully address the overall project goals and site issues. These new facilities will be designed to accommodate the staff, drivers and maintenance requirements for the future mixed fleet of passenger vehicles, Transit Style Buses and School Buses.

  12. PROJECT PORTFOLIO SELECTION COMPETENCES RESEARCH INUNIVERSITIES OF LITHUANIA

    OpenAIRE

    R #363;ta #268;iutien #279;; Evelina Meilien #279;; Bronius Neverauskas

    2011-01-01

    As a result of the theoretical findings, the paperdemonstrates that projectportfolio selection is crucial project management problem. Successful ProjectPortfolio management requires specific competences.Every project of projectportfolio must be evaluated according to the basedcriteria and parameters.Empirical study was based on framework matrix withfour parameters of projectportfolio selection and only two phases of projectportfolio formation. The r...

  13. Site-Selection in Single-Molecule Junction for Highly Reproducible Molecular Electronics.

    Science.gov (United States)

    Kaneko, Satoshi; Murai, Daigo; Marqués-González, Santiago; Nakamura, Hisao; Komoto, Yuki; Fujii, Shintaro; Nishino, Tomoaki; Ikeda, Katsuyoshi; Tsukagoshi, Kazuhito; Kiguchi, Manabu

    2016-02-03

    Adsorption sites of molecules critically determine the electric/photonic properties and the stability of heterogeneous molecule-metal interfaces. Then, selectivity of adsorption site is essential for development of the fields including organic electronics, catalysis, and biology. However, due to current technical limitations, site-selectivity, i.e., precise determination of the molecular adsorption site, remains a major challenge because of difficulty in precise selection of meaningful one among the sites. We have succeeded the single site-selection at a single-molecule junction by performing newly developed hybrid technique: simultaneous characterization of surface enhanced Raman scattering (SERS) and current-voltage (I-V) measurements. The I-V response of 1,4-benzenedithiol junctions reveals the existence of three metastable states arising from different adsorption sites. Notably, correlated SERS measurements show selectivity toward one of the adsorption sites: "bridge sites". This site-selectivity represents an essential step toward the reliable integration of individual molecules on metallic surfaces. Furthermore, the hybrid spectro-electric technique reveals the dependence of the SERS intensity on the strength of the molecule-metal interaction, showing the interdependence between the optical and electronic properties in single-molecule junctions.

  14. An ArcGIS decision support tool for artificial reefs site selection (ArcGIS ARSS)

    Science.gov (United States)

    Stylianou, Stavros; Zodiatis, George

    2017-04-01

    Although the use and benefits of artificial reefs, both socio-economic and environmental, have been recognized with research and national development programmes worldwide their development is rarely subjected to a rigorous site selection process and the majority of the projects use the traditional (non-GIS) approach, based on trial and error mode. Recent studies have shown that the use of Geographic Information Systems, unlike to traditional methods, for the identification of suitable areas for artificial reefs siting seems to offer a number of distinct advantages minimizing possible errors, time and cost. A decision support tool (DSS) has been developed based on the existing knowledge, the multi-criteria decision analysis techniques and the GIS approach used in previous studies in order to help the stakeholders to identify the optimal locations for artificial reefs deployment on the basis of the physical, biological, oceanographic and socio-economic features of the sites. The tool provides to the users the ability to produce a final report with the results and suitability maps. The ArcGIS ARSS support tool runs within the existing ArcMap 10.2.x environment and for the development the VB .NET high level programming language has been used along with ArcObjects 10.2.x. Two local-scale case studies were conducted in order to test the application of the tool focusing on artificial reef siting. The results obtained from the case studies have shown that the tool can be successfully integrated within the site selection process in order to select objectively the optimal site for artificial reefs deployment.

  15. The utility of Geographical Information Systems (GIS) in systems-oriented obesity intervention projects: the selection of comparable study sites for a quasi-experimental intervention design--TX CORD.

    Science.gov (United States)

    Oluyomi, Abiodun O; Byars, Allison; Byrd-Williams, Courtney; Sharma, Shreela V; Durand, Casey; Hoelscher, Deanna M; Butte, Nancy F; Kelder, Steven H

    2015-02-01

    The Texas Childhood Obesity Research Demonstration project (TX CORD) uses a systems-oriented approach to address obesity that includes individual and family interventions, community-level action, as well as environmental and policy initiatives. Given that randomization is seldom possible in community-level intervention studies, TX CORD uses a quasi-experimental design. Comparable intervention and comparison study sites are needed to address internal validity bias. TX CORD was designed to be implemented in low-income, ethnically diverse communities in Austin and Houston, Texas. A three-stage Geographical Information System (GIS) methodology was used to establish and ascertain the comparability of the intervention and comparison study sites. Census tract (stage 1) and school (stage 2) data were used to identify spatially exclusive geographic areas that were comparable. In stage 3, study sites were compared on demographic characteristics, socioeconomic status (SES), food assets, and physical activity (PA) assets. Student's t-test was used to examine significant differences between the selected sites. The methodology that was used resulted in the selection of catchment areas with demographic and socioeconomic characteristics that fit the target population: ethnically diverse population; lower-median household income; and lower home ownership rates. Additionally, the intervention and comparison sites were statistically comparable on demographic and SES variables, as well as food assets and PA assets. This GIS approach can provide researchers, program evaluators, and policy makers with useful tools for both research and practice. Area-level information that allows for robust understanding of communities can enhance analytical procedures in community health research and offer significant contributions in terms of community assessment and engagement.

  16. Site observational work plan for the UMTRA Project Site at Tuba City, Arizona

    International Nuclear Information System (INIS)

    1994-09-01

    The requirements for ground water compliance for Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Tuba City, Arizona, site, are found in the Uranium Mill Tailings Radiation Control Act; Subparts B and C of the U.S. Environmental Protection Agency's Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR 192 (1994)), and the associated proposed 1987 standards (52 FR 36000). During the surface remedial action, an estimated 1,400,000 cubic yards (yd 3 ) (1,100,000 cubic meters [m 3 ]) of uranium mill tailings and other contaminated materials were consolidated and stabilized in place in an unlined disposal cell covering 50 acres (20 hectares). The surface remedial action was completed in April 1990. Ground water beneath the Tuba City site was contaminated by subsurface migration of water from uranium ore processing activities. The main source of contaminants was water from the tailings piles that began in 1956 when the mill opened and ended in 1966 when the mill closed. A total of 800,000 tons (725,000 tonnes) of uranium ore were processed onsite over a 10-year period. Two processes were used to refine the ore: an acid leach process and a sodium carbonate alkaline process. Water from these tailings then seeped into the ground and migrated downward to the ground water. The Tuba City site is currently in a post-stabilization, prelicensing status. The preliminary ground water compliance strategy at the Tuba City site is active remediation. The specific technology to be evaluated is in situ bioremediation. This selection was made because of the potential ability of bioremediation to reduce concentrations to lower levels than a conventional extraction system and to minimize disturbance of the water resource

  17. URBAN RAIN GAUGE SITING SELECTION BASED ON GIS-MULTICRITERIA ANALYSIS

    Directory of Open Access Journals (Sweden)

    Y. Fu

    2016-06-01

    Full Text Available With the increasingly rapid growth of urbanization and climate change, urban rainfall monitoring as well as urban waterlogging has widely been paid attention. In the light of conventional siting selection methods do not take into consideration of geographic surroundings and spatial-temporal scale for the urban rain gauge site selection, this paper primarily aims at finding the appropriate siting selection rules and methods for rain gauge in urban area. Additionally, for optimization gauge location, a spatial decision support system (DSS aided by geographical information system (GIS has been developed. In terms of a series of criteria, the rain gauge optimal site-search problem can be addressed by a multicriteria decision analysis (MCDA. A series of spatial analytical techniques are required for MCDA to identify the prospective sites. With the platform of GIS, using spatial kernel density analysis can reflect the population density; GIS buffer analysis is used to optimize the location with the rain gauge signal transmission character. Experiment results show that the rules and the proposed method are proper for the rain gauge site selection in urban areas, which is significant for the siting selection of urban hydrological facilities and infrastructure, such as water gauge.

  18. No advantages in terms of safety. 'Energy in a Dialog' about the 'Final disposal site selection law'

    International Nuclear Information System (INIS)

    Anon.

    2013-01-01

    The current legislative process for the site selection law (StandAG) was topic of the DAtF event 'Energy in a Dialog' on 6 June 2013 in Berlin: 'Is the path the goal: purpose and results of the site selection law'. The President of the German Atomic Forum (DAtF), Dr. Ralf Gldner, moderated the discussion with Prof. Dr. Ortwin Renn of the University of Stuttgart and the CEO of the Gesellschaft fuer Nuklear-Service (GNS), Hannes Wimmer. The opportunities and risks of a new site search for high-level radioactive waste were the main topics. Professor Renn summarized some findings to conditions of acceptance perceived in connection with industrial projects. Dr. Wimmer said in his keynote that social acceptance for site selection for a repository must be maintained for a long time. During the ensuing discussion, a common understanding was evident on some aspects of the topic. This is especially true for a limitation of the new location search method in terms of its objective. As a realistic objective to determine a secure suitable site was considered instead of a 'best' location proposed by the new law. (orig.)

  19. Discriminative Projection Selection Based Face Image Hashing

    Science.gov (United States)

    Karabat, Cagatay; Erdogan, Hakan

    Face image hashing is an emerging method used in biometric verification systems. In this paper, we propose a novel face image hashing method based on a new technique called discriminative projection selection. We apply the Fisher criterion for selecting the rows of a random projection matrix in a user-dependent fashion. Moreover, another contribution of this paper is to employ a bimodal Gaussian mixture model at the quantization step. Our simulation results on three different databases demonstrate that the proposed method has superior performance in comparison to previously proposed random projection based methods.

  20. Outdoor radon monitoring plan for the UMTRA Project sites

    International Nuclear Information System (INIS)

    1986-02-01

    This document describes the monitoring schedules and methods used to measure ambient radon concentrations around Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Radon monitoring at both processing sites and disposal sites is performed primarily for two reasons. The first, and foremost, of these is to provide a means to keep the off-site radon concentrations during the construction activities As Low As Reasonably Achievable (ALARA). The second purpose is to provide a basis for comparison with the EPA standards developed for the UMTRA Project. Radon monitoring data are also used to demonstrate compliance with ambient concentration standards and for public information due to concern about potential radiation releases during construction. 1 fig., 1 tab

  1. Site Observational Work Plan for the UMTRA Project Site at Shiprock, New Mexico. Revision

    International Nuclear Information System (INIS)

    1995-07-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is one of the first documents for developing an approach for achieving ground water compliance at the site. This SOWP applies Shiprock site information to a regulatory compliance framework, which identifies strategies for meeting ground water compliance at the site. The compliance framework was developed in the UMTRA ground water programmatic environmental impact statement

  2. Thunder Bay Terminals Ltd. Site selection to operation: the management function

    Energy Technology Data Exchange (ETDEWEB)

    Cook, P.R.

    1979-08-01

    Thunder Bay Terminals Ltd. is a link in a new transportation system for Canada's natural resources stretching over 3000 miles from British Columbia's mountains to Ontario's lower Great Lakes. Thunder Bay Terminals' plant, now in operation, cost about $70 million and was completed on time and under budget. The paper is the project manager's account of this accomplishment. From site selection through feasibility, engineering and construction to realization, he emphasizes the necessary philosophies for the control of time and money. The computer as a tool is discussed, as well as techniques for procurement.

  3. The role of safety analyses in site selection. Some personal observations based on the experience from the Swiss site selection process

    Energy Technology Data Exchange (ETDEWEB)

    Zuidema, Piet [Nagra, Wettingen (Switzerland)

    2015-07-01

    In Switzerland, the site selection process according to the ''Sectoral Plan for Deep Geological Repositories'' (BFE 2008) is underway since 2008. This process takes place in three stages. In stage 1 geological siting regions (six for the L/ILW repository and three for the HLW repository) have been identified, in stage 2 sites for the surface facilities have been identified for all siting regions in close co-operation with the sting regions and a narrowing down of the number of siting regions based on geological criteria will take place. In stage 3 the sites for a general license application are selected and the general license applications will be submitted which eventually will lead to the siting decision for both repository types. In the Swiss site selection process, safety has the highest priority. Many factors affect safety and thus a whole range of safety-related issues are considered in the identification and screening of siting possibilities. Besides dose calculations a range of quantitative and qualitative issues are considered. Dose calculations are performed in all three stages of the site selection process. In stage 1 generic safety calculations were made to develop criteria to be used for the identification of potential siting regions. In stage 2, dose calculations are made for comparing the different siting regions according to a procedure prescribed in detail by the regulator. Combined with qualitative evaluations this will lead to a narrowing down of the number of siting regions to at least two siting regions for each repository type. In stage 3 full safety cases will be prepared as part of the documentation for the general license applications. Besides the dose calculations, many other issues related to safety are analyzed in a quantitative and qualitative manner. These consider the 13 criteria defined in the Sectoral Plan and the corresponding indicators. The features analyzed cover the following broad themes: efficiency of

  4. The role of safety analyses in site selection. Some personal observations based on the experience from the Swiss site selection process

    International Nuclear Information System (INIS)

    Zuidema, Piet

    2015-01-01

    In Switzerland, the site selection process according to the ''Sectoral Plan for Deep Geological Repositories'' (BFE 2008) is underway since 2008. This process takes place in three stages. In stage 1 geological siting regions (six for the L/ILW repository and three for the HLW repository) have been identified, in stage 2 sites for the surface facilities have been identified for all siting regions in close co-operation with the sting regions and a narrowing down of the number of siting regions based on geological criteria will take place. In stage 3 the sites for a general license application are selected and the general license applications will be submitted which eventually will lead to the siting decision for both repository types. In the Swiss site selection process, safety has the highest priority. Many factors affect safety and thus a whole range of safety-related issues are considered in the identification and screening of siting possibilities. Besides dose calculations a range of quantitative and qualitative issues are considered. Dose calculations are performed in all three stages of the site selection process. In stage 1 generic safety calculations were made to develop criteria to be used for the identification of potential siting regions. In stage 2, dose calculations are made for comparing the different siting regions according to a procedure prescribed in detail by the regulator. Combined with qualitative evaluations this will lead to a narrowing down of the number of siting regions to at least two siting regions for each repository type. In stage 3 full safety cases will be prepared as part of the documentation for the general license applications. Besides the dose calculations, many other issues related to safety are analyzed in a quantitative and qualitative manner. These consider the 13 criteria defined in the Sectoral Plan and the corresponding indicators. The features analyzed cover the following broad themes: efficiency of

  5. The Italian forest sites of FunDivEUROPE: a new FP7 project on the functional significance of forest biodiversity in Europe

    Directory of Open Access Journals (Sweden)

    Bussotti F

    2012-12-01

    Full Text Available The Italian forest sites of FunDivEUROPE: a new FP7 project on the functional significance of forest biodiversity in Europe. FunDivEUROPE is a new project aiming at a deeper understanding of the role of forest diversity on ecosystem functions and service provisioning for society. This project combines three scientific platforms: experimental, exploratory and inventory. The exploratory platform is based on the observation of a broad range of properties, traits and ecological processes on a network of ca. 240 natural forest sites representing a gradient of tree species diversity in six focal regions of Europe (Spain, Italy, Germany, Poland, Finland and Romania. The Italian sites are located on the hills of central and Southern Tuscany and represent the category “thermophilous deciduous forest”. Almost one year of fieldwork was needed to select and characterize 36 plots measuring 30 x 30 m. Selection was based on criteria concerning tree mixtures and richness, structural parameters and main environmental variables. The main features of these sites are synthetically presented in this paper together with a short description of the project structure and scope. The aim is also to enhance dissemination of the potential implications for a sustainable forest management in Italy.

  6. Selection of a portfolio of R & D projects

    NARCIS (Netherlands)

    Casault, Sébastien; Groen, Arend J.; Linton, J.D.; Linton, Jonathan; Link, A.N.; Vonortas, N.S.

    2013-01-01

    While portfolios of research are increasingly discussed, a portfolio perspective is infrequently taken when selecting two or more projects. Consequently, this chapter considers the current state of knowledge in project and portfolio selection, identifies why we can and cannot apply knowledge from

  7. Selection of suitable sites for NPP in Slovenia (stage 3)

    International Nuclear Information System (INIS)

    Grgic, M.; Fabjan, L.; Premru, U.

    1977-01-01

    Selection of suitable sites for nuclear power plants in Slovenia is considered. This includes the studies of available data on regional and local characteristics specified in general site suitability criteria for NPP. The most suitable selected sites will be included into land use urbanistic planning of Slovenia

  8. URBAN RAIN GAUGE SITING SELECTION BASED ON GIS-MULTICRITERIA ANALYSIS

    OpenAIRE

    Y. Fu; C. Jing; M. Du

    2016-01-01

    With the increasingly rapid growth of urbanization and climate change, urban rainfall monitoring as well as urban waterlogging has widely been paid attention. In the light of conventional siting selection methods do not take into consideration of geographic surroundings and spatial-temporal scale for the urban rain gauge site selection, this paper primarily aims at finding the appropriate siting selection rules and methods for rain gauge in urban area. Additionally, for optimization gauge loc...

  9. Selection of candidate sites for a LLRW disposal facility in Connecticut

    International Nuclear Information System (INIS)

    Gingerich, Ronald E.; Holeman, George R.; Hileman, James A.

    1992-01-01

    Connecticut, one of the two members of the Northeast Interstate Low-Level Radioactive Waste Management Compact, has been directed by the Compact Commission to site a facility to manage the low-level radioactive waste (LLRW) generated in Connecticut. The Connecticut Hazardous Waste Management Service (CHWMS) has been given the responsibility to identify a site in the state for a LLRW disposal facility. The CHWMS has decided to plan for a site with an operating life of 50 years. A site of at least 160 acres will be needed to accommodate (he expected volume of LLRW and meet state and federal site requirements. A Site Selection Plan establishing the process and criteria to be used in siting a facility was adopted by the CHWMS in November 1990. The Plan calls for a stepwise screening of the state using published data to identify three candidate sites. A preferred site will be selected from among the candidate sites using onsite testing. The site selection criteria, which closely follow state and federal statutory and regulatory requirements, are divided into three types: exclusionary, avoidance and preference. Battelle Memorial Institute was selected as the contractor to assist the CHWMS in site screening. With guidance from the CHWMS, Battelle undertook screening of the state by applying the exclusionary, avoidance and preference criteria in three steps to identify from eight to twelve potential sites. The CHWMS Board of Directors bad decided that it wanted to be closely involved in the selection of the three candidate sites and to do so in a way that precluded the political and parochial pressures that are inevitably associated with a siting process. To meet these two goals a geographically neutral approach was devised for candidate site selection. In June, 1991 the CHWMS, with assistance from Battelle, conducted a three day workshop, open to the public, in which eight sites were presented to the Board. Data on the sites were presented in a way that did not disclose

  10. ANP applied to electronics engineering project selection

    International Nuclear Information System (INIS)

    Habib, M.

    2010-01-01

    Project selection in Electronics engineering is a complex decision-making process. This research paper illustrates an application of ANP/AHP process. The AHP (Analytic Hierarchy Process) is employed to break down large unstructured decision problems into manageable and measureable components. The ANP, as the general form of AHP, is powerful to deal with complex decisions where interdependence exists in a decision model. The research paper discusses the use of the ANP, a general form of Saaty's analytic Network process, as a model to evaluate the value of competing Electronics projects. The research paper concludes with a case study describing the implementation of this model at an engineering college, including data based on the actual use of the decision making model. The case study helps to verify that AHP is an effective and efficient decision-making tool. A major contribution of this work is to provide a methodology for assessing the best project. Despite a number of publications applying AHP in project selection, this is probably the first time that an attempt has been made to apply AHP in an electronics project selection in an engineering university environment. (author)

  11. 20 CFR 638.303 - Site selection and facilities management.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Site selection and facilities management. 638... Facilities Management § 638.303 Site selection and facilities management. (a) The Job Corps Director shall... center, facilities engineering and real estate management will be conducted by the Job Corps Director or...

  12. Yucca Mountain site characteriztion project bibliography. Progress Report, 1994--1995

    International Nuclear Information System (INIS)

    1996-08-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project which was added to the Department of Energy's Energy Science and Technology Database from January 1, 1994, through December 31, 1995. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology database which were not sponsored by the project but have some relevance to it

  13. Yucca Mountain site characteriztion project bibliography. Progress Report, 1994--1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project which was added to the Department of Energy`s Energy Science and Technology Database from January 1, 1994, through December 31, 1995. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization`s list. Another section contains information about publications on the Energy Science and Technology database which were not sponsored by the project but have some relevance to it.

  14. Environmental Assessment of Ground Water Compliance at the Gunnison, Colorado, UMTRA Project Site

    International Nuclear Information System (INIS)

    2002-01-01

    The U.S. Department of Energy (DOE) is in the process of selecting a ground water compliance strategy for the Gunnison, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. This Environmental Assessment (EA) discusses two alternatives and the effects associated with each. The two alternatives are (1) natural flushing coupled with institutional controls and continued monitoring and (2) no action. The compliance strategy must meet U.S. Environmental Protection Agency (EPA) ground water standards defined in Title 40 ''Code of Federal Regulations'' Part 192, Subpart B, in areas where ground water beneath and around the site is contaminated as a result of past milling operations. It has been determined that contamination in the ground water at the Gunnison site consists of soluble residual radioactive material (RRM) as defined in the Uranium Mill Tailings Radiation Control Act (UMTRCA)

  15. Site-directed alkylation of multiple opioid receptors. I. Binding selectivity

    International Nuclear Information System (INIS)

    James, I.F.; Goldstein, A.

    1984-01-01

    A method for measuring and expressing the binding selectivity of ligands for mu, delta, and kappa opioid binding sites is reported. Radioligands are used that are partially selective for these sites in combination with membrane preparations enriched in each site. Enrichment was obtained by treatment of membranes with the alkylating agent beta-chlornaltrexamine in the presence of appropriate protecting ligands. After enrichment for mu receptors, [ 3 H] dihydromorphine bound to a single type of site as judged by the slope of competition binding curves. After enrichment for delta or kappa receptors, binding sites for [ 3 H] [D-Ala2, D-Leu5]enkephalin and [3H]ethylketocyclazocine, respectively, were still not homogeneous. There were residual mu sites in delta-enriched membranes but no evidence for residual mu or delta sites in kappa-enriched membranes were found. This method was used to identify ligands that are highly selective for each of the three types of sites

  16. The Utility of Geographical Information Systems (GIS) in Systems-Oriented Obesity Intervention Projects: The Selection of Comparable Study Sites for a Quasi-Experimental Intervention Design—TX CORD

    Science.gov (United States)

    Byars, Allison; Byrd-Williams, Courtney; Sharma, Shreela V.; Durand, Casey; Hoelscher, Deanna M.; Butte, Nancy F.; Kelder, Steven H.

    2015-01-01

    Abstract Background: The Texas Childhood Obesity Research Demonstration project (TX CORD) uses a systems-oriented approach to address obesity that includes individual and family interventions, community-level action, as well as environmental and policy initiatives. Given that randomization is seldom possible in community-level intervention studies, TX CORD uses a quasi-experimental design. Comparable intervention and comparison study sites are needed to address internal validity bias. Methods: TX CORD was designed to be implemented in low-income, ethnically diverse communities in Austin and Houston, Texas. A three-stage Geographical Information System (GIS) methodology was used to establish and ascertain the comparability of the intervention and comparison study sites. Census tract (stage 1) and school (stage 2) data were used to identify spatially exclusive geographic areas that were comparable. In stage 3, study sites were compared on demographic characteristics, socioeconomic status (SES), food assets, and physical activity (PA) assets. Student's t-test was used to examine significant differences between the selected sites. Results: The methodology that was used resulted in the selection of catchment areas with demographic and socioeconomic characteristics that fit the target population: ethnically diverse population; lower-median household income; and lower home ownership rates. Additionally, the intervention and comparison sites were statistically comparable on demographic and SES variables, as well as food assets and PA assets. Conclusions: This GIS approach can provide researchers, program evaluators, and policy makers with useful tools for both research and practice. Area-level information that allows for robust understanding of communities can enhance analytical procedures in community health research and offer significant contributions in terms of community assessment and engagement. PMID:25587670

  17. Final disposal of spent nuclear fuel - basis for site selection

    International Nuclear Information System (INIS)

    Anttila, P.

    1995-05-01

    International organizations, e.g. IAEA, have published several recommendations and guides for the safe disposal of radioactive waste. There are three major groups of issues affecting the site selection process, i.e. geological, environmental and socioeconomic. The first step of the site selection process is an inventory of potential host rock formations. After that, potential study areas are screened to identify sites for detailed investigations, prior to geological conditions and overall suitability for the safe disposal. This kind of stepwise site selection procedure has been used in Finland and in Sweden. A similar approach has been proposed in Canada, too. In accordance with the amendment to the Nuclear Energy Act, that entered into force in the beginning of 1995, Imatran Voima Oy has to make preparations for the final disposal of spent fuel in the Finnish bedrock. Relating to the possible site selection, the following geological factors, as internationally recommended and used in the Nordic countries, should be taken into account: topography, stability of bedrock, brokenness and fracturing of bedrock, size of bedrock block, rock type, predictability and natural resources. The bedrock of the Loviisa NPP site is a part of the Vyborg rapakivi massif. As a whole the rapakivi granite area forms a potential target area, although other rock types or areas cannot be excluded from possible site selection studies. (25 refs., 7 figs.)

  18. Licensing plan for UMTRA project disposal sites

    International Nuclear Information System (INIS)

    1993-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC's acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information

  19. Global Land Survey Impervious Mapping Project Web Site

    Science.gov (United States)

    DeColstoun, Eric Brown; Phillips, Jacqueline

    2014-01-01

    The Global Land Survey Impervious Mapping Project (GLS-IMP) aims to produce the first global maps of impervious cover at the 30m spatial resolution of Landsat. The project uses Global Land Survey (GLS) Landsat data as its base but incorporates training data generated from very high resolution commercial satellite data and using a Hierarchical segmentation program called Hseg. The web site contains general project information, a high level description of the science, examples of input and output data, as well as links to other relevant projects.

  20. Gorleben. Waste management site based on an appropriate selection procedure

    International Nuclear Information System (INIS)

    Tiggemann, Anselm

    2010-01-01

    On February 22, 1977, the Lower Saxony state government decided in favor of Gorleben as a ''preliminary'' site of a ''potential'' facility for managing the back end of the fuel cycle of the nuclear power plants in the Federal Republic of Germany. The Lower Saxony files, closed until recently, now allow both the factual basis and the political background to be reconstructed comprehensively. The first selection procedure, financed by the federal government, for the site of a ''nuclear waste management center,'' which had been conducted by Kernbrennstoff-Wiederaufarbeitungsgesellschaft (KEWA) in 1974, had not considered Gorleben in any detail. As early as in the winter of 1975/76, Gorleben and a number of other potential sites were indicated to KEWA by the Lower Saxony State Ministry of Economics. The new finding is KEWA's conclusion of 1976 that Gorleben surpassed all potential sites examined so far in terms of suitability. As a consequence, Gorleben was regarded as an alternative alongside the 3 sites favored before, i.e. Wahn, Lutterloh, and Lichtenhorst, when the 3 Federal Ministers, Hans Matthoefer (SPD), Werner Maihofer (F.D.P.), and Hans Friderichs (F.D.P.), discussed the nuclear waste management project with Minister President Albrecht (CDU) in November 1976. The Lower Saxony State Cabinet commissioned an interministerial working party (IMAK) to find other potential sites besides Wahn, Lutterloh, Lichtenhorst, and Gorleben. IMAK proposed Gorleben, Lichtenhorst, Mariaglueck, and Wahn for further examination. IMAK recommended to the State Cabinet in another proposal to earmark either Gorleben or Lichtenhorst. (orig.)

  1. Communication activities for NUMO's site selection process

    International Nuclear Information System (INIS)

    Takeuchi, Mitsuo; Okuyama, Shigeru; Kitayama, Kazumi; Kuba, Michiyoshi

    2004-01-01

    A siting program for geological disposal of high-level radioactive waste (HLW) in Japan has just started and is moving into a new stage of communication with the public. A final repository site will be selected via a stepwise process, as stipulated in the Specified Radioactive Waste Final Disposal Act promulgated in June 2000. Based on the Act, the site selection process of the Nuclear Waste Management Organization of Japan (NUMO, established in October 2000) will be carried out in the three steps: selection of Preliminary Investigation Areas (PIAs), selection of Detailed Investigation Areas (DIAs) and selection of the Repository Site. The Act also defines NUMO's responsibilities in terms of implementing the HLW disposal program in an open and transparent manner. NUMO fully understands the importance of public participation in its activities and is aiming to promote public involvement in the process of site selection based on a fundamental policy, which consists of 'adopting a stepwise approach', 'respecting the initiative of municipalities' and 'ensuring transparency in information disclosure'. This policy is clearly reflected in the adoption of an open solicitation approach for volunteer municipalities for Preliminary Investigation Areas (PIAs). NUMO made the official announcement of the start of its open solicitation program on 19 December 2002. This paper outlines how NUMO's activities are currently carried out with a view to encouraging municipalities to volunteer as PIAs and how public awareness of the safety of the HLW disposal is evaluated at this stage

  2. Hanford tank initiative test facility site selection study

    International Nuclear Information System (INIS)

    Staehr, T.W.

    1997-01-01

    The Hanford Tanks Initiative (HTI) project is developing equipment for the removal of hard heel waste from the Hanford Site underground single-shell waste storage tanks. The HTI equipment will initially be installed in the 241-C-106 tank where its operation will be demonstrated. This study evaluates existing Hanford Site facilities and other sites for functional testing of the HTI equipment before it is installed into the 241-C-106 tank

  3. METHOD FOR SELECTION OF PROJECT MANAGEMENT APPROACH BASED ON FUZZY CONCEPTS

    Directory of Open Access Journals (Sweden)

    Igor V. KONONENKO

    2017-03-01

    Full Text Available Literature analysis of works that devoted to research of the selection a project management approach and development of effective methods for this problem solution is given. Mathematical model and method for selection of project management approach with fuzzy concepts of applicability of existing approaches are proposed. The selection is made of such approaches as the PMBOK Guide, the ISO21500 standard, the PRINCE2 methodology, the SWEBOK Guide, agile methodologies Scrum, XP, and Kanban. The number of project parameters which have a great impact on the result of the selection and measure of their impact is determined. Project parameters relate to information about the project, team, communication, critical project risks. They include the number of people involved in the project, the customer's experience with this project team, the project team's experience in this field, the project team's understanding of requirements, adapting ability, initiative, and others. The suggested method is considered on the example of its application for selection a project management approach to software development project.

  4. Automated training site selection for large-area remote-sensing image analysis

    Science.gov (United States)

    McCaffrey, Thomas M.; Franklin, Steven E.

    1993-11-01

    A computer program is presented to select training sites automatically from remotely sensed digital imagery. The basic ideas are to guide the image analyst through the process of selecting typical and representative areas for large-area image classifications by minimizing bias, and to provide an initial list of potential classes for which training sites are required to develop a classification scheme or to verify classification accuracy. Reducing subjectivity in training site selection is achieved by using a purely statistical selection of homogeneous sites which then can be compared to field knowledge, aerial photography, or other remote-sensing imagery and ancillary data to arrive at a final selection of sites to be used to train the classification decision rules. The selection of the homogeneous sites uses simple tests based on the coefficient of variance, the F-statistic, and the Student's i-statistic. Comparisons of site means are conducted with a linear growing list of previously located homogeneous pixels. The program supports a common pixel-interleaved digital image format and has been tested on aerial and satellite optical imagery. The program is coded efficiently in the C programming language and was developed under AIX-Unix on an IBM RISC 6000 24-bit color workstation.

  5. Selection of sites for nuclear power plants in The Netherlands. Pt. A

    International Nuclear Information System (INIS)

    1985-01-01

    In this report a policy proposal is presented concerning the selection of location sites for new nuclear power plants in the Netherlands. Firstly it is investigated which of the 29 already selected location sites are not to be taken into further account because of obvious obstructions (close vicinity of a big city etc.). The remaining sites are judged on the base of local population magnitude. The sites that pass the last criteria are relatively compared from a large number of viewpoints. To round off the selection procedure the government will explain why they consider the finally selected sites to be suitable for location of new nuclear power plants. Steps are indicated to prevent the decrease of planologic suitability of the selected location sites. (Auth.)

  6. Combining AHP and DEA Methods for Selecting a Project Manager

    Directory of Open Access Journals (Sweden)

    Baruch Keren

    2014-07-01

    Full Text Available A project manager has a major influence on the success or failure of the project. A good project manager can match between the strategy and objectives of the organization and the goals of the project. Therefore, the selection of the appropriate project manager is a key factor for the success of the project. A potential project manager is judged by his or her proven performance and personal qualifications. This paper proposes a method to calculate the weighted scores and the full rank of candidates for managing a project, and to select the best of those candidates. The proposed method combines specific methodologies: the Data Envelopment Analysis (DEA and the Analytical Hierarchical Process (AHP and uses DEA Ranking Methods to enhance selection.

  7. Site-selective {sup 13}C labeling of proteins using erythrose

    Energy Technology Data Exchange (ETDEWEB)

    Weininger, Ulrich, E-mail: ulrich.weininger@physik.uni-halle.de [Lund University, Department of Biophysical Chemistry, Center for Molecular Protein Science (Sweden)

    2017-03-15

    NMR-spectroscopy enables unique experimental studies on protein dynamics at atomic resolution. In order to obtain a full atom view on protein dynamics, and to study specific local processes like ring-flips, proton-transfer, or tautomerization, one has to perform studies on amino-acid side chains. A key requirement for these studies is site-selective labeling with {sup 13}C and/or {sup 1}H, which is achieved in the most general way by using site-selectively {sup 13}C-enriched glucose (1- and 2-{sup 13}C) as the carbon source in bacterial expression systems. Using this strategy, multiple sites in side chains, including aromatics, become site-selectively labeled and suitable for relaxation studies. Here we systematically investigate the use of site-selectively {sup 13}C-enriched erythrose (1-, 2-, 3- and 4-{sup 13}C) as a suitable precursor for {sup 13}C labeled aromatic side chains. We quantify {sup 13}C incorporation in nearly all sites in all 20 amino acids and compare the results to glucose based labeling. In general the erythrose approach results in more selective labeling. While there is only a minor gain for phenylalanine and tyrosine side-chains, the {sup 13}C incorporation level for tryptophan is at least doubled. Additionally, the Phe ζ and Trp η2 positions become labeled. In the aliphatic side chains, labeling using erythrose yields isolated {sup 13}C labels for certain positions, like Ile β and His β, making these sites suitable for dynamics studies. Using erythrose instead of glucose as a source for site-selective {sup 13}C labeling enables unique or superior labeling for certain positions and is thereby expanding the toolbox for customized isotope labeling of amino-acid side-chains.

  8. AN ASSESSMENT OF FACTORS AFFECTING MATERIAL STOCK CONTROL PRACTICE ON SELECTED CONSTRUCTION SITES IN NIGERIA

    OpenAIRE

    Adafin, Johnson Kayode; Ayodele, Elijah Olusegun; Daramola, Olufemi

    2011-01-01

    This research examines the stock control methods utilized by construction firms on construction sites with a view to assessing the factors affecting material stock control practice by construction firms as well as determining the impact of factors affecting material stock control on building project performance. Data were collected with the aid of well-structured questionnaire administered on a number of construction professionals and technicians in some randomly selected building constructio...

  9. SKI SITE-94. Deep Repository Performance Assessment Project. Summary

    International Nuclear Information System (INIS)

    1997-02-01

    The function of SITE-94 is to provide the Swedish Nuclear Power Inspectorate (SKI) with the capacity and supporting knowledge needed for reviewing the Swedish nuclear industry's R and D programs and for reviewing license applications, as stipulated in Swedish legislation. The report is structured as a Performance Assessment exercise needed for input to decisions regarding repository safety, but the SITE-94 is neither a safety assessment nor a model for future assessments to be undertaken by the prospective licensee. The specific project objectives of SITE-94 comprise site evaluation, performance assessment methodology, canister integrity and radionuclide release and transport calculations. The main report (SKI-R--96-36) gives a detailed description of the many inter-related studies undertaken as part of the research project, while the present report presents a condensed summary of the main report. 46 refs

  10. Siting guidelines and their role in repository site selection

    International Nuclear Information System (INIS)

    Hanlon, C.L.

    1985-01-01

    The first requirement of the Nuclear Waste Policy Act was for the Secretary of Energy to issue general guidelines for siting repositories. The guidelines were to specify detailed geologic considerations that would be the primary criteria for the selection of sites in various host rocks, as well as factors that would qualify or disqualify any site from development as a repository. These guidelines were clearly intended to provide not only the framework for the siting program but also the stimulus for establishing effective communication and consultation among the parties involved in the program. The Act further required that the guidelines be a factor in the development of all future decision documents of the Office of Civilian Radioactive Waste Management, including the environmental assessments that would accompany the nomination of sites for characterization, the site-characterization plans that are to be prepared before the sinking of exploratory shafts at any candidate site, and the environmental impact statement that is to support the recommendation of a site for development as a repository. More than two years after its passage, the intention of the Act for the guidelines has been realized. Concurred in by the Nuclear Regulatory Commission on June 22, 1984, and issued by the Department in November 1984, the guidelines include postclosure technical guidelines that apply to conditions governing the long-term performance of the repository system; preclosure technical guidelines that apply to conditions governing the siting, construction, operation, and closure of the repository; and system guidelines whose objective is to ensure that the regulatory requirements of the Environmental Protection Agency and the Nuclear Regulatory Commission are met

  11. Development of the NUMO pre-selection, site-specific safety case

    International Nuclear Information System (INIS)

    Fujiyama, Tetsuo; Suzuki, Satoru; Deguchi, Akira; Umeki, Hiroyuki

    2016-01-01

    Key conclusions: ◆ “The NUMO pre-selection, site-specific safety case” provides the basic structure for subsequent safety cases that will be applied to any selected site, emphasising practical approaches and methodology which will be applicable for the conditions/constraints during an actual siting process. ◆ The preliminary results of the design and safety assessment would underpin the feasibility and safety of geological disposal in Japan.

  12. Multi-Site Project Management A Program for Reducing the Cost of Technology Deployment at Department of Energy Sites

    International Nuclear Information System (INIS)

    Davis, N.R.; Selden, E.R.; Little, D.B.; Coleman, M.C.; Bennett, J.T.

    2009-01-01

    Retrieval and processing of High Level Waste (HLW) stored in Department of Energy (DOE) waste tanks is performed to support closure of the tanks as required by site specific regulatory agreements. Currently, there are four sites in the DOE Complex that have HLW tanks and must process and disposition HLW. As such, there is an opportunity to achieve an economy of scale and reduce duplication of efforts. Two or more sites typically have similar technology development and deployment needs. Technology development is already executed at the national level. As the technology is matured, the next step is to commission a design/build project. Typically each site performs this separately due to differences in waste type, tank design, site specific considerations such as proximity to the water table or to the site boundary. The focus of the individual sites tends to be on the differences between sites versus on the similarities thus there is an opportunity to minimize the cost for similar deployments. A team of engineers and project management professionals from the Savannah River Site has evaluated technology needs at the four HLW sites and determined that there is an economy of scale that can be achieved by specific technology deployments in the area of waste retrieval, waste pretreatment and waste disposition. As an example, the Waste on Wheels tank retrieval system (presented in the 2006 Waste Management Symposium) was designed and fabricated in portable modules that could be installed in HLW tanks at Hanford, Savannah River or Idaho. This same concept could be used for modular in-tank cesium removal process and equipment, tank cleaning mechanical equipment, and chemical tank cleaning process and equipment. The purpose of this paper is to present a multi-site project management approach that will reduce deployment costs and be consistent with DOE Order 413.3 project management principles. The approach will describe how projects can be managed by a lead site with

  13. Idaho National Laboratory Ten-Year Site Plan Project Description Document

    Energy Technology Data Exchange (ETDEWEB)

    Not Listed

    2012-03-01

    This document describes the currently active and proposed infrastructure projects listed in Appendix B of the Idaho National Laboratory 2013-2022 Ten Year Site Plan (DOE/ID-11449). It was produced in accordance with Contract Data Requirements List I.06. The projects delineated in this document support infrastructure needs at INL's Research and Education Campus, Materials and Fuels Complex, Advanced Test Reactor Complex and the greater site-wide area. The projects provide critical infrastructure needed to meet current and future INL opereational and research needs. Execution of these projects will restore, rebuild, and revitalize INL's physical infrastructure; enhance program execution, and make a significant contribution toward reducing complex-wide deferred maintenance.

  14. An integrated approach to site selection for nuclear power plants

    International Nuclear Information System (INIS)

    Hassan, E.M.A.

    1975-01-01

    A method of analysing and evaluating the large number of factors influencing site selection is proposed, which can interrelate these factors and associated problems in an integrated way and at the same time establish a technique for site evaluation. The objective is to develop an integrated programme that illustrates the complexity and dynamic interrelationships of the various factors to develop an improved understanding of the functions and objectives of siting nuclear power plants and would aim finally at the development of an effective procedure and technique for site evaluation and/or comparative evaluation for making rational site-selection decisions. (author)

  15. Bayesian spatial prediction of the site index in the study of the Missouri Ozark Forest Ecosystem Project

    Science.gov (United States)

    Xiaoqian Sun; Zhuoqiong He; John Kabrick

    2008-01-01

    This paper presents a Bayesian spatial method for analysing the site index data from the Missouri Ozark Forest Ecosystem Project (MOFEP). Based on ecological background and availability, we select three variables, the aspect class, the soil depth and the land type association as covariates for analysis. To allow great flexibility of the smoothness of the random field,...

  16. Development and Validation of a Quantitative Framework and Management Expectation Tool for the Selection of Bioremediation Approaches at Chlorinated Ethene Sites

    Science.gov (United States)

    2015-12-01

    FINAL REPORT Development and Validation of a Quantitative Framework and Management Expectation Tool for the Selection of Bioremediation ...TITLE AND SUBTITLE Development and Validation of a Quantitative Framework and Management Expectation Tool for the Selection of Bioremediation ...project ER-201129 was to develop and validate a framework used to make bioremediation decisions based on site-specific physical and biogeochemical

  17. Large-scale control site selection for population monitoring: an example assessing Sage-grouse trends

    Science.gov (United States)

    Fedy, Bradley C.; O'Donnell, Michael; Bowen, Zachary H.

    2015-01-01

    Human impacts on wildlife populations are widespread and prolific and understanding wildlife responses to human impacts is a fundamental component of wildlife management. The first step to understanding wildlife responses is the documentation of changes in wildlife population parameters, such as population size. Meaningful assessment of population changes in potentially impacted sites requires the establishment of monitoring at similar, nonimpacted, control sites. However, it is often difficult to identify appropriate control sites in wildlife populations. We demonstrated use of Geographic Information System (GIS) data across large spatial scales to select biologically relevant control sites for population monitoring. Greater sage-grouse (Centrocercus urophasianus; hearafter, sage-grouse) are negatively affected by energy development, and monitoring of sage-grouse population within energy development areas is necessary to detect population-level responses. Weused population data (1995–2012) from an energy development area in Wyoming, USA, the Atlantic Rim Project Area (ARPA), and GIS data to identify control sites that were not impacted by energy development for population monitoring. Control sites were surrounded by similar habitat and were within similar climate areas to the ARPA. We developed nonlinear trend models for both the ARPA and control sites and compared long-term trends from the 2 areas. We found little difference between the ARPA and control sites trends over time. This research demonstrated an approach for control site selection across large landscapes and can be used as a template for similar impact-monitoring studies. It is important to note that identification of changes in population parameters between control and treatment sites is only the first step in understanding the mechanisms that underlie those changes. Published 2015. This article is a U.S. Government work and is in the public domain in the USA.

  18. Conflict between public perceptions and technical processes in site selection

    International Nuclear Information System (INIS)

    Avant, R.V. Jr.; Jacobi, L.R.

    1985-01-01

    U.S. Nuclear Regulatory Commission regulations and guidance on site selection are based on sound technical reasoning. Geology, hydrology, flora and fauna, transportation, demographics, and sociopolitical concerns, to name a few, have been factored into the process. Regardless of the technical objectivity of a site selection process, local opposition groups will challenge technical decisions using technical, nontechnical, and emotional arguments. This paper explores the many conflicts between public perceptions, technical requirements designed to protect the general public, and common arguments against site selection. Ways to deal with opposition are also discussed with emphasis placed on developing effective community relations

  19. An ANP-based approach for the selection of photovoltaic solar power plant investment projects

    International Nuclear Information System (INIS)

    Aragones-Beltran, P.; Pastor-Ferrando, J.P.; Rodriguez-Pozo, F.; Chaparro-Gonzalez, F.

    2010-01-01

    In this paper the Analytic Network Process (ANP) is applied to the selection of photovoltaic (PV) solar power projects. These projects follow a long management and execution process from plant site selection to plant start-up. As a consequence, there are many risks of time delays and even of project stoppage. In the case study presented in this paper a top manager of an important Spanish company that operates in the power market has to decide on the best PV project (from four alternative projects) to invest based on risk minimization. The manager identified 50 project execution delay and/or stoppage risks. The influences between the elements of the network (groups of risks and alternatives) were identified and analyzed using the ANP multicriteria decision analysis method. Two different ANP models were used: one hierarchy model (that considers AHP as a particular case of ANP) and one network-based model. The results obtained in each model were compared and analyzed. The main conclusion is that unlike the other models used in the study, the single network model can manage all the information of the real-world problem and thus it is the decision analysis model recommended by the authors. The strengths and weaknesses of ANP as a multicriteria decision analysis tool are also described in the paper. (author)

  20. Selection of den sites by black bears in the southern Appalachians

    Science.gov (United States)

    Reynolds-Hogland, M. J.; Mitchell, M.S.; Powell, R.A.; Brown, D.C.

    2007-01-01

    We evaluated selection of den sites by American black bears (Ursus americanus) in the Pisgah Bear Sanctuary, western North Carolina, by comparing characteristics of dens at 53 den sites with availability of habitat characteristics in annual home ranges of bears and in the study area. We also tested whether den-site selection differed by sex, age, and reproductive status of bears. In addition, we evaluated whether the den component of an existing habitat model for black bears predicted where bears would select den sites. We found bears selected den sites far from gravel roads, on steep slopes, and at high elevations relative to what was available in both annual home ranges and in the study area. Den-site selection did not differ by sex or age, but it differed by reproductive status. Adult females with cubs preferred to den in areas that were relatively far from gravel roads, but adult females without cubs did not. The habitat model overestimated the value of areas near gravel roads, underestimated the value of moderately steep areas, and did not include elevation as a predictor variable. Our results highlight the importance of evaluating den selection in terms of both use and availability of den characteristics. ?? 2007 American Society of Mammalogists.

  1. Preliminary selection criteria for the Yucca Mountain Project waste package container material

    International Nuclear Information System (INIS)

    Halsey, W.G.

    1991-01-01

    The Department of Energy's Yucca Mountain Project (YMP) is evaluating a site at Yucca Mountain in Nevada for construction of a geologic repository for the storage of high-level nuclear waste. Lawrence Livermore National Laboratory's (LLNL) Nuclear Waste Management Project (NWMP) has the responsibility for design, testing, and performance analysis of the waste packages. The design is performed in an iterative manner in three sequential phases (conceptual design, advanced conceptual design, and license application design). An important input to the start of the advanced conceptual design is the selection of the material for the waste containers. The container material is referred to as the 'metal barrier' portion of the waste package, and is the responsibility of the Metal Barrier Selection and Testing task at LLNL. The selection will consist of several steps. First, preliminary, material-independent selection criteria will be established based on the performance goals for the container. Second, a variety of engineering materials will be evaluated against these criteria in a screening process to identify candidate materials. Third, information will be obtained on the performance of the candidate materials, and final selection criteria and quantitative weighting factors will be established based on the waste package design requirements. Finally, the candidate materials will be ranked against these criteria to determine whether they meet the mandated performance requirements, and to provide a comparative score to choose the material for advanced conceptual design activities. This document sets forth the preliminary container material selection criteria to be used in screening candidate materials. 5 refs

  2. Effects of intraguild predators on nest-site selection by prey.

    Science.gov (United States)

    Huang, Wen-San; Pike, David A

    2012-01-01

    Nest-site selection involves tradeoffs between the risk of predation (on females and/or nests) and nest-site quality (microenvironment), and consequently suitable nesting sites are often in limited supply. Interactions with "classical" predators (e.g., those not competing for shared resources) can strongly influence nest-site selection, but whether intraguild predation also influences this behavior is unknown. We tested whether risk of predation from an intraguild predator [the diurnal scincid lizard Eutropis (Mabuya) longicaudata] influences nest-site selection by its prey (the nocturnal gecko Gekko hokouensis) on Orchid Island, Taiwan. These two species putatively compete for shared resources, including invertebrate prey and nesting microhabitat, but the larger E. longicaudata also predates G. hokouensis (but not its hard-shelled eggs). Both species nested within a concrete wall containing a series of drainage holes that have either one ("closed-in") or two openings ("open"). In allopatry, E. longicaudata preferred to nest within holes that were plugged by debris (thereby protecting eggs from water intrusion), whereas G. hokouensis selected holes that were open at both ends (facilitating escape from predators). When we experimentally excluded E. longicaudata from its preferred nesting area, G. hokouensis not only nested in higher abundances, but also modified its nest-site selection, such that communal nesting was more prevalent and both open and closed-in holes were used equally. Egg viability was unaffected by the choice of hole type, but was reduced slightly (by 7%) in the predator exclusion area (presumably due to higher local incubation temperatures). Our field experiment demonstrates that intraguild predators can directly influence the nest density of prey by altering maternal nest-site selection behavior, even when the predator and prey are active at different times of day and the eggs are not at risk of predation.

  3. Screening methodology for site selection of a nuclear waste repository in shale formations in Germany

    International Nuclear Information System (INIS)

    Hoth, P.; Krull, P.; Wirth, H.

    2004-01-01

    The radioactive waste disposal policy in the Federal Republic of Germany is based on the principle that all types of radioactive waste must be disposed of in deep geological formations. Because of the favourable properties of rock salt and the existence of thick rock salt formations in Germany, so far most of the research in the field of radioactive waste disposal sites was focused on the study of the use of rock salt. In addition, German research organisations have also conducted generic research and development projects in alternative geological formations (Wanner and Brauer, 2001), but a comprehensive evaluation of their utilisation has been only done for parts of the crystalline rocks in Germany. Research projects on argillaceous rocks started relatively late, so that German experience is mainly connected to German research work with the corresponding European Underground Research Laboratories and the exploration of the former Konrad iron mine as a potential repository site for radioactive waste with negligible heat generation. The German Federal Government has signed in 2001 an agreement with national utility companies to end electricity generation by nuclear power. This decision affected the entire German radioactive waste isolation strategy and especially the repository projects. The utility companies agreed upon standstill of exploration at the Gorleben site and the Federal Ministry for the Environment tries to establish a new comprehensive procedure for the selection of a repository site, built upon well-founded criteria incorporating public participation. Step 3 of the planning includes the examination of further sites in Germany and the comparison with existing sites and concepts. Under these circumstances, argillaceous rock (clay and shale) formations are now a special area of interest in Germany and the development of a screening methodology was required for the evaluation of shales as host and barrier rocks for nuclear waste repositories. (author)

  4. An integrated study of spatial multicriteria analysis and mathematical modelling for managed aquifer recharge site suitability mapping and site ranking at Northern Gaza coastal aquifer.

    Science.gov (United States)

    Rahman, Mohammad Azizur; Rusteberg, Bernd; Uddin, Mohammad Salah; Lutz, Annegret; Saada, Muath Abu; Sauter, Martin

    2013-07-30

    This paper describes an integrated approach of site suitability mapping and ranking of the most suitable sites, for the implementation of Managed Aquifer Recharge (MAR) projects, using spatial multicriteria decision analysis (SMCDA) techniques and mathematical modelling. The SMCDA procedure contains constraint mapping, site suitability analysis with criteria standardization and weighting, criteria overlay by analytical hierarchy process (AHP) combined with weighted linear combination (WLC) and ordered weighted averaging (OWA), and sensitivity analysis. The hydrogeological impacts of the selected most suitable sites were quantified by using groundwater flow and transport modelling techniques. Finally, ranking of the selected sites was done with the WLC method. The integrated approach is demonstrated by a case study in the coastal aquifer of North Gaza. Constraint mapping shows that 50% of the total study area is suitable for MAR implementation. About 25% of the total area is "very good" and 25% percent is "good" for MAR, according to the site suitability analysis. Six locations were selected and ranked against six representative decision criteria. Long term (year 2003 to year 2040) groundwater flow and transport simulations were performed to quantify the selected criteria under MAR project operation conditions at the selected sites. Finally, the suitability mapping and hydrogeological investigation recommends that the location of the existing infiltration ponds, constructed near the planned North Gaza Wastewater Treatment Plant (NGWWTP) is most suitable for MAR project implementation. This paper concludes that mathematical modelling should be combined with the SMCDA technique in order to select the best location for MAR project implementation. Besides MAR project implementation, the generalised approach can be applicable for any other water resources development project that deals with site selection and implementation. Copyright © 2013 Elsevier Ltd. All rights

  5. Yucca Mountain Site Characterization Project Bibliography, July--December 1994: An update

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Charactrization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy`s Science and Technology Database from July 1, 1994 through December 31, 1994. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization`s list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it.

  6. Yucca Mountain Site Characterization Project Bibliography, July, December 194: An update

    International Nuclear Information System (INIS)

    1995-03-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Charactrization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Science and Technology Database from July 1, 1994 through December 31, 1994. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it

  7. Site observational work plan for the UMTRA Project Site at Riverton, Wyoming. Revision 3/95

    International Nuclear Information System (INIS)

    1995-03-01

    Ground water compliance for the Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Riverton, Wyoming, site, is governed by the Uranium Mill Tailings Radiation Control Act and the US Environmental Protection Agency's Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings. The compliance strategy proposed for this site is natural flushing in conjunction with institutional controls. The essential premise of natural flushing is that ground water movement and natural attenuation processes will reduce the detected contamination to background levels or alternate concentration limits that do not pose a risk to human health or the environment within 100 years. This document contains the following sections. Section 2.0 of this SOWP describes the requirements for meeting standards at UMTRA Project sites. Section 3.0 provides site-specific data and the related conceptual model. Section 4.0 provides the justification for the recommended ground water compliance strategy for the Riverton site. Section 5.0 provides the justification and process for collection and assessment of additional required data. Section 6.0 provides a list of the references cited. The appendixes include data on monitor wells and lithography, ground water, surface water, and sediment quality

  8. Site selection of nuclear power plants

    International Nuclear Information System (INIS)

    Schnappauf, W.

    1982-01-01

    A stock report of the development of the extent as well as the fundamentals of the conflict about nuclear energy shows that the effective law is both another cause and a mirror of the discussions about it. In total the investigation shows that the planning of site selection suffers from a number of legal problems. They are mainly of structural kind and are concerned with the issues of citizens' participation and graduation of procedures which are central for the management of the conflict. Therefore the present set of instruments is hardly able to contribute to increasing the acceptancy. The kind and extent of issues on one hand as well as the dimension of the conflict on the other make clear that the executive power itself is overtaxed. In this situation the legislative authorities are called up to take responsibility upon themselves. There are no objections from the constitutional or other aspects to legal site selection. (orig./HSCH) [de

  9. Site selection criteria for the shallow land burial of low-level radioactive waste

    International Nuclear Information System (INIS)

    Falconer, K.L.; Hull, L.C.; Mizell, S.A.

    The shallow land burial of low-level waste must be accomplished in a manner that ensures the public and biosphere are protected from harmful amounts of radiation. This can be attained by selecting, designing, operating and closing sites such that contaminants never leave the site boundary in levels above regulatory limits. Site design, operation and closure are all functions of the characteristics of the site selected. As a result, the site selection process offers the most effective means for optimizing safe, efficient and economical low-level waste burial practices. The purpose of this document is to set forth criteria for the selection of shallow land burial sites. Criteria are standard rules, by which the ability of a site to meet waste management goals can be judged. They are comprehensive, universal, and qualitative and are applicable in any geologic environment. Site selection criteria provide the framework for the siting process

  10. Software quality assurance on the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Matras, J.R.

    1993-01-01

    The Yucca Mountain Site Characterization Project (YMP) has been involved over the years in the continuing struggle with establishing acceptable Software Quality Assurance (SQA) requirements for the development, modification, and acquisition of computer programs used to support the Mined Geologic Disposal System. These computer programs will be used to produce or manipulate data used directly in site characterization, design, analysis, performance assessment, and operation of repository structures, systems, and components. Scientists and engineers working on the project have claimed that the SQA requirements adopted by the project are too restrictive to allow them to perform their work. This paper will identify the source of the original SQA requirements adopted by the project. It will delineate the approach used by the project to identify concerns voiced by project engineers and scientists regarding the original SQA requirements. It will conclude with a discussion of methods used to address these problems in the rewrite of the original SQA requirements

  11. Directing reaction pathways by catalyst active-site selection using self-assembled monolayers.

    Science.gov (United States)

    Pang, Simon H; Schoenbaum, Carolyn A; Schwartz, Daniel K; Medlin, J Will

    2013-01-01

    One key route for controlling reaction selectivity in heterogeneous catalysis is to prepare catalysts that exhibit only specific types of sites required for desired product formation. Here we show that alkanethiolate self-assembled monolayers with varying surface densities can be used to tune selectivity to desired hydrogenation and hydrodeoxygenation products during the reaction of furfural on supported palladium catalysts. Vibrational spectroscopic studies demonstrate that the selectivity improvement is achieved by controlling the availability of specific sites for the hydrogenation of furfural on supported palladium catalysts through the selection of an appropriate alkanethiolate. Increasing self-assembled monolayer density by controlling the steric bulk of the organic tail ligand restricts adsorption on terrace sites and dramatically increases selectivity to desired products furfuryl alcohol and methylfuran. This technique of active-site selection simultaneously serves both to enhance selectivity and provide insight into the reaction mechanism.

  12. A Case Study in the Mars Landing Site Selection for Science Objects

    Directory of Open Access Journals (Sweden)

    Haingja Seo

    2012-12-01

    Full Text Available It is a crucial matter to select a landing site for landers or rovers in planning the Mars exploration. The landing site must have not only a scientific value as a landing site, but also geographical features to lead a safe landing for Mars probes. In this regard, this study analyzed landing site of Mars probes and rovers in previous studies and discussed the adequacy of the landing site to scientific missions. Moreover, this study also examined domestic studies on the Mars. The frameworks of these studies will guide the selection of exploration sites and a landing site when sending Mars probe to the Mars through our own efforts. Additionally, this paper will be used as the preliminary data for selection of exploration site and a landing site.

  13. Site-selective spectroscopy of Er in GaN

    International Nuclear Information System (INIS)

    Dierolf, V.; Sandmann, C.; Zavada, J.; Chow, P.; Hertog, B.

    2004-01-01

    We investigated different Er 3+ defect sites found in Er-doped GaN layers by site-selective combined excitation-emission spectroscopy and studied the role of these sites in different direct and multistep excitation schemes. The layers were grown by molecular beam epitaxy and were 200 nm thick. Two majority sites were found along with several minority sites. The sites strongly differ in excitation and energy transfer efficiencies as well as branching ratios during relaxation. For this reason, relative emission intensities from these sites depend strongly on emission and excitation. The sites were identified for several transitions and a comprehensive list of energy levels has been compiled. One of the minority sites appears strongly under ultraviolet excitation above the GaN band gap suggesting that this site is an excellent trap for excitation energy of electron-hole pairs

  14. Using maximum entropy modeling for optimal selection of sampling sites for monitoring networks

    Science.gov (United States)

    Stohlgren, Thomas J.; Kumar, Sunil; Barnett, David T.; Evangelista, Paul H.

    2011-01-01

    Environmental monitoring programs must efficiently describe state shifts. We propose using maximum entropy modeling to select dissimilar sampling sites to capture environmental variability at low cost, and demonstrate a specific application: sample site selection for the Central Plains domain (453,490 km2) of the National Ecological Observatory Network (NEON). We relied on four environmental factors: mean annual temperature and precipitation, elevation, and vegetation type. A “sample site” was defined as a 20 km × 20 km area (equal to NEON’s airborne observation platform [AOP] footprint), within which each 1 km2 cell was evaluated for each environmental factor. After each model run, the most environmentally dissimilar site was selected from all potential sample sites. The iterative selection of eight sites captured approximately 80% of the environmental envelope of the domain, an improvement over stratified random sampling and simple random designs for sample site selection. This approach can be widely used for cost-efficient selection of survey and monitoring sites.

  15. Controlling site selectivity in Pd-catalyzed oxidative cross-coupling reactions.

    Science.gov (United States)

    Lyons, Thomas W; Hull, Kami L; Sanford, Melanie S

    2011-03-30

    This paper presents a detailed investigation of the factors controlling site selectivity in the Pd-mediated oxidative coupling of 1,3-disubstituted and 1,2,3-trisubstituted arenes (aryl-H) with cyclometalating substrates (L~C-H). The influence of both the concentration and the steric/electronic properties of the quinone promoter are studied in detail. In addition, the effect of steric/electronic modulation of the carboxylate ligand is discussed. Finally, we demonstrate that substitution of the carboxylate for a carbonate X-type ligand leads to a complete reversal in site selectivity for many arene substrates. The origins of these trends in site selectivity are discussed in the context of the mechanism of Pd-catalyzed oxidative cross-coupling.

  16. Patterns of mutation and selection at synonymous sites in Drosophila

    DEFF Research Database (Denmark)

    Singh, Nadia D; Bauer DuMont, Vanessa L; Hubisz, Melissa J

    2007-01-01

    , when applied to 18 coding sequences in 3 species of Drosophila, confirmed an earlier report that the Notch gene in Drosophila melanogaster was evolving under selection in favor of those codons defined as unpreferred in this species. This finding opened the possibility that synonymous sites may...... be subject to a variety of selective pressures beyond weak selection for increased frequencies of the codons currently defined as "preferred" in D. melanogaster. To further explore patterns of synonymous site evolution in Drosophila in a lineage-specific manner, we expanded the application of the maximum...... likelihood framework to 8,452 protein coding sequences with well-defined orthology in D. melanogaster, Drosophila sechellia, and Drosophila yakuba. Our analyses reveal intragenomic and interspecific variation in mutational patterns as well as in patterns and intensity of selection on synonymous sites. In D...

  17. Comparison between dispersed nuclear power plants and a nuclear energy center at a hypothetical site on Kentucky Lake, Tennessee. Vol. IV. A site selection methodology

    International Nuclear Information System (INIS)

    Rosemarin, C.S.; Yaffee, S.L.

    1976-09-01

    A methodology has been developed for selecting suitable sites for development as nuclear energy centers. First, the forty-eight contiguous states were screened on the basis of four variables: (1) seismic stability; (2) distance from projected population centers; (3) adequate water supply; and (4) noninterference with scenic and reserved lands. After location of a surrogate area in north central Tennessee, further screening was performed using 22 variables to find a suitable 75-sq-mile surrogate site within this 1500-sq-mile area. A computer method for screening the surrogate area is presented, and the use of the data for the 22 variables is illustrated

  18. Tools and Methods for Risk Management in Multi-Site Engineering Projects

    Science.gov (United States)

    Zhou, Mingwei; Nemes, Laszlo; Reidsema, Carl; Ahmed, Ammar; Kayis, Berman

    In today's highly global business environment, engineering and manufacturing projects often involve two or more geographically dispersed units or departments, research centers or companies. This paper attempts to identify the requirements for risk management in a multi-site engineering project environment, and presents a review of the state-of-the-art tools and methods that can be used to manage risks in multi-site engineering projects. This leads to the development of a risk management roadmap, which will underpin the design and implementation of an intelligent risk mapping system.

  19. Building trust with the public in site selection of radioactive waste repository in Croatia

    International Nuclear Information System (INIS)

    Cerskov Klika, Mirjana; Schaller, Antun

    1995-01-01

    It should be emphasised that the Republic of Croatia ought to find a solution to dispose not only radioactive waste generated on its own territory, i.e. waste derived from diverse medical, industrial and scientific nuclear applications which does not exceed some 70 cubic metres: in total. It is also obliged to find acceptable solutions for disposal of a half of total radioactive waste accumulating in the Krsko NPP which is situated in Slovenia, but is a joint venture facility of both countries, Slovenia and Croatia. Therefore, one of essential duties of the APO - Hazardous Waste Management Agency is just performance of these activities in Croatia. The site selection process of low- and intermediate radioactive waste disposal in Croatia started in 1988. The site selection process itself is organized in two stages: (1) site survey stage; and 2) site evaluation stage. The first stage, being currently in progress, is related to all activities directed to inclusion of preferred sites into the Regional Plan of Croatia, whilst the second stage includes a necessary on-field investigations at few preferred sites and identification of the most suitable one, i.e. the final repository site. Eight potential areas containing even 42 potential sites have been determined so far. Promotion of several preferred sites is expected to be done until July 1995. Official announcement of preferred sites will be followed by public debate on their acceptance at a level of political-territorial organization, including local communities. The people working in APO - Hazardous Waste Management Agency have been aware of considerable public resistance to most of activities the Agency is dealing with since the very beginning of its operation. Consequently, permanent education and honest information to the public have been taken as the Agency's high priority tasks. Namely, if the public is treated as a competent participant in decision making process then it gets obvious that publicity of work is

  20. Study on site selection of cold chain logistics in northwest territories

    Science.gov (United States)

    Liu, Yubin; Ren, Zongwei

    2017-08-01

    In this research, we mainly studied the Site selection problem of cold chain logistics in northwest of China. In the first place, we counted the demands of cold chain products in northwest territories, and then classified it into the Site selection problem in five provinces in northwest territories(Xinjiang, Qinghai, Gansu, Ningxia, Shanxi); Next, we used the Center of gravity Method to select initial location; Finally, we established the location of distribution by using Analytic Hierarchy Process (AHP)and fuzzy comprehensive evaluation method. Comparing with the traditional method, this method not only considered the cost of transportation and distance, but also deliberated the physical condition, social environment and economics condition which associated with Site selection problem.

  1. Argentinian experience in selecting sites for nuclear power stations

    International Nuclear Information System (INIS)

    Csik, B.J.

    1975-01-01

    One nuclear power station is in operation in the Republic of Argentina, a second is under construction, and the decision to build a third has been taken. According to existing plans, about ten nuclear power stations should go into operation during the next decade. The present paper analyses the experience acquired in selecting sites for the first units, commenting on the criteria and methods applied, the studies that were carried out, the specific problems encountered and the solutions adopted, as well as on the question of acceptance of the chosen sites by the public. It goes on to describe the current programme of selection and study of sites for future nuclear power stations

  2. Selecting users for participation in IT projects

    DEFF Research Database (Denmark)

    Rasmussen, Rasmus; Christensen, Anders S.; Fjeldsted, Tobias

    2011-01-01

    The selection of users for participation in IT projects involves trade-offs between multiple criteria, one of which is selecting a representative cross-section of users. This criterion is basic because trading it for other criteria means basing designs on information biased toward some user groups...... at the expense of others. Based on interviews in development and customer organizations we find that their criteria for user selection favour persons who can contribute to the progress of the IT project over persons who are representative of the full range of users. A highly valued contribution from...... participating users is the ability to advocate a vision for the system and champion its organizational implementation. A survey in one customer organization shows that respondents’ personal traits explain up to 31% of the variation in their experience of aspects of the usability of a recently introduced system...

  3. Study for the selection of optimal site in northeastern, Mexico for wind power generation using genetic algorithms.

    Science.gov (United States)

    Gonzalez, T.; Ruvalcaba, A.; Oliver, L.

    2016-12-01

    The electricity generation from renewable resources has acquired a leading role. Mexico particularrly it has great interest in renewable natural resources for power generation, especially wind energy. Therefore, the country is rapidly entering in the development of wind power generators sites. The development of a wind places as an energy project, does not have a standardized methodology. Techniques vary according to the developer to select the best place to install a wind turbine system. Generally to install the system the developers consider three key factors: 1) the characteristics of the wind, 2) the potential distribution of electricity and 3) transport access to the site. This paper presents a study with a different methodology which is carried out in two stages: the first at regional scale uses "space" and "natural" criteria in order to select a region based on its cartographic features such as politics and physiographic division, location of conservation natural areas, water bodies, urban criteria; and natural criteria such as the amount and direction of the wind, the type and land use, vegetation, topography and biodiversity of the site. The result of the application of these criteria, gives a first optimal selection area. The second part of the methodology includes criteria and variables on detail scale. The analysis of all data information collected will provide new parameters (decision variables) for the site. The overall analysis of the information, based in these criteria, indicates that the best location that the best location of the field would be the southern Coahuila and the central part of Nuevo Leon. The wind power site will contribute to the economy grow of important cities including Monterrey. Finally, computational model of genetic algorithm will be used as a tool to determine the best site selection depending on the parameters considered.

  4. Living memorials project: year 1 social and site assessment

    Science.gov (United States)

    Erika S. Svendsen; Lindsay K. Campbell

    2005-01-01

    The Living Memorials Project (LMP) social and site assessment identified more than 200 public open spaces created, used, or enhanced in memory of the tragic events of September 11, 2001 (9-11). A national registry of these sites is available for viewing and updating online. Researchers interviewed 100 community groups using social ecology methods of observation,...

  5. Decision-making for the selection of sites and energy systems suited to Benin needs

    International Nuclear Information System (INIS)

    Semassou, Clarence

    2011-01-01

    The analysis of the wind sites and the solar possibilities of Benin led the works towards the energy systems, of the autonomous photovoltaic type, coupled with batteries of storage. These appropriate energy systems were analyzed, modelled and optimized. The criteria of optimization arise from a survey realized in near the persons in charge who take care of questions of electrification in rural areas, of selected professionals who play a major role in the decision-making of the projects of electrification in rural areas, local associations which benefited from these projects in Benin, from technicians and from users of these systems. These criteria are organized into a hierarchy according to the method AMDEC. A method of adapted optimization was realized; she appeals to an original vision of levelheadedness. (author) [fr

  6. Reliable Refuge: Two Sky Island Scorpion Species Select Larger, Thermally Stable Retreat Sites.

    Science.gov (United States)

    Becker, Jamie E; Brown, Christopher A

    2016-01-01

    Sky island scorpions shelter under rocks and other surface debris, but, as with other scorpions, it is unclear whether these species select retreat sites randomly. Furthermore, little is known about the thermal preferences of scorpions, and no research has been done to identify whether reproductive condition might influence retreat site selection. The objectives were to (1) identify physical or thermal characteristics for retreat sites occupied by two sky island scorpions (Vaejovis cashi Graham 2007 and V. electrum Hughes 2011) and those not occupied; (2) determine whether retreat site selection differs between the two study species; and (3) identify whether thermal selection differs between species and between gravid and non-gravid females of the same species. Within each scorpion's habitat, maximum dimensions of rocks along a transect line were measured and compared to occupied rocks to determine whether retreat site selection occurred randomly. Temperature loggers were placed under a subset of occupied and unoccupied rocks for 48 hours to compare the thermal characteristics of these rocks. Thermal gradient trials were conducted before parturition and after dispersal of young in order to identify whether gravidity influences thermal preference. Vaejovis cashi and V. electrum both selected larger retreat sites that had more stable thermal profiles. Neither species appeared to have thermal preferences influenced by reproductive condition. However, while thermal selection did not differ among non-gravid individuals, gravid V. electrum selected warmer temperatures than its gravid congener. Sky island scorpions appear to select large retreat sites to maintain thermal stability, although biotic factors (e.g., competition) could also be involved in this choice. Future studies should focus on identifying the various biotic or abiotic factors that could influence retreat site selection in scorpions, as well as determining whether reproductive condition affects thermal

  7. Understanding the selection processes of public research projects

    NARCIS (Netherlands)

    Materia, V.C.; Pascucci, S.; Kolympiris, C.

    2015-01-01

    This paper analyses factors that affect the funding of agricultural research projects by regional governments and other regional public authorities. We study the selection process of agricultural research projects funded by the emilia Romagna regional government in Italy, which follows funding

  8. Site selection procedure for high level radioactive waste disposal in Bulgaria

    International Nuclear Information System (INIS)

    Evstatiev, D.; Vachev, B.

    1993-01-01

    A combined site selection approach is implemented. Bulgaria's territory has been classified in three categories, presented on a 1:500000 scale map. The number of suitable sites has been reduced to 20 using the method of successive screening. The formulated site selection problem is a typical discrete multi-criteria decision making problem under uncertainty. A 5-level procedure using Expert Choice Rating and relative models is created. It is a part of a common procedure for evaluation and choice of variants for high level radwaste disposal construction. On this basis 7-8 more preferable sites are demonstrated. A new knowledge and information about the relative importance of the criteria and their subsets, about the level of criteria uncertainty and the reliability are gained. It is very useful for planning and managing of the next final stages of the site selection procedure. 7 figs., 8 refs., 4 suppls. (author)

  9. Artificial Cavities and Nest Site Selection by Puerto Rican Parrots: a Multiscale Assessment

    Directory of Open Access Journals (Sweden)

    Thomas H. White, Jr.

    2006-12-01

    Full Text Available We examined nest site selection by Puerto Rican Parrots, a secondary cavity nester, at several spatial scales using the nest entrance as the central focal point relative to 20 habitat and spatial variables. The Puerto Rican Parrot is unique in that, since 2001, all known nesting in the wild has occurred in artificial cavities, which also provided us with an opportunity to evaluate nest site selection without confounding effects of the actual nest cavity characteristics. Because of the data limitations imposed by the small population size of this critically endangered endemic species, we employed a distribution-free statistical simulation approach to assess site selection relative to characteristics of used and unused nesting sites. Nest sites selected by Puerto Rican Parrots were characterized by greater horizontal and vertical visibility from the nest entrance, greater density of mature sierra palms, and a more westerly and leeward orientation of nest entrances than unused sites. Our results suggest that nest site selection in this species is an adaptive response to predation pressure, to which the parrots respond by selecting nest sites offering advantages in predator detection and avoidance at all stages of the nesting cycle. We conclude that identifying and replicating the “nest gestalt” of successful nesting sites may facilitate conservation efforts for this and other endangered avian species.

  10. Six Sigma Project Selection Using Fuzzy TOPSIS Decision Making Approach

    Directory of Open Access Journals (Sweden)

    Rajeev Rathi

    2015-05-01

    Full Text Available Six Sigma is considered as a logical business strategy that attempts to identify and eliminate the defects or failures for improving the quality of product and processes. A decision on project selection in Six Sigma is always very critical; it plays a key role in successful implementation of Six Sigma. Selection of a right Six Sigma project is essentially important for an automotive company because it greatly influences the manufacturing costs. This paper discusses an approach for right Six Sigma project selection at an automotive industry using fuzzy logic based TOPSIS method. The fuzzy TOPSIS is a well recognized tool to undertake the fuzziness of the data involved in choosing the right preferences. In this context, evaluation criteria have been designed for selection of best alternative. The weights of evaluation criteria are calculated by using the MDL (modified digital logic method and final ranking is calculated through priority index obtained by using fuzzy TOPSIS method. In the selected case study, this approach has rightly helped to identify the right project for implementing Six Sigma for achieving improvement in productivity.

  11. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Lowman, Idaho: Remedial action selection report for the Lowman UMTRA project site, Idaho

    International Nuclear Information System (INIS)

    Matthews, M.L.; Nagel, J.

    1991-09-01

    The inactive uranium mill tailings site near Lowman, Idaho, was designated as one of 24 abandoned uranium tailings sites to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan and certify that the remedial action complies with the standards promulgated by the US Environmental Protection Agency (EPA). The remedial action plan (RAP), which includes this remedial action selection report (RAS), has been developed to serve a two-fold purpose. First, it describes the activities that are proposed by the DOE to accomplish long-term stabilization and control of residual radioactive materials at the inactive uranium processing site near Lowman, Idaho. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Idaho, and the NRC, becomes Appendix B of the Cooperative Agreement (No. DE-FC04-85AL20535) between the DOE and the State of Idaho

  12. Supplementary Report on the Regulation of Site Selection and Preparation

    International Nuclear Information System (INIS)

    Webster, Philip

    2014-01-01

    The Committee on Nuclear Regulatory Activities (CNRA), based on the regulatory actions underway or being considered in different members countries concerning the design and construction of advanced nuclear power plants, established a working group responsible of the regulatory issues of siting, licensing and regulatory oversight of generation III+ and generation IV nuclear reactors. The Working Group on the Regulation of New Reactors (WGRNR) main purposes are to improve regulatory reviews by comparing practices in member countries; improve the licensing process of new reactors by learning from best practices in member countries; ensure that construction inspection issues and construction experience is shared; promote cooperation among member countries to improve safety; and enhance the effectiveness and efficiency of the regulatory process. The WGRNR has established a programme of work which includes: the collection of construction experience and the assessing of the information collected in order to share lessons learned and good practices; the review of regulatory practices concerning the regulation of nuclear sites selection and preparation; and the review of recent regulatory experience concerning the licensing structure of regulatory staff and regulatory licensing process. The WGRNR began in May 2008 a task of examining and documenting the various practices used by regulatory authorities in the regulation of nuclear power plant siting. The purpose of the task was to provide the member countries with practical information that would be helpful in assessing and potentially improving their regulatory practices and requirements on the regulation of sites. The task considered also regulatory practices on sites where a mixture of activities are taking place (e.g. operating units, new construction, and decommissioning, etc.). This work led to the publication in 2010 of the Report on the Survey on Regulation of Site Selection and Preparation NEA/CNRA/R(2010)3. This

  13. Radioactive waste disposal: Recommendations for a repository site selection

    International Nuclear Information System (INIS)

    Cadelli, N.; Orlowski, S.

    1992-01-01

    This report is a guidebook on recommendations for site selection of radioactive waste repository, based on a consensus in european community. This report describes particularly selection criteria and recommendations for radioactive waste disposal in underground or ground repositories. 14 refs

  14. Supramolecular Recognition Allows Remote, Site-Selective C-H Oxidation of Methylenic Sites in Linear Amines.

    Science.gov (United States)

    Olivo, Giorgio; Farinelli, Giulio; Barbieri, Alessia; Lanzalunga, Osvaldo; Di Stefano, Stefano; Costas, Miquel

    2017-12-18

    Site-selective C-H functionalization of aliphatic alkyl chains is a longstanding challenge in oxidation catalysis, given the comparable relative reactivity of the different methylenes. A supramolecular, bioinspired approach is described to address this challenge. A Mn complex able to catalyze C(sp 3 )-H hydroxylation with H 2 O 2 is equipped with 18-benzocrown-6 ether receptors that bind ammonium substrates via hydrogen bonding. Reversible pre-association of protonated primary aliphatic amines with the crown ether selectively exposes remote positions (C8 and C9) to the oxidizing unit, resulting in a site-selective oxidation. Remarkably, such control of selectivity retains its efficiency for a whole series of linear amines, overriding the intrinsic reactivity of C-H bonds, no matter the chain length. © 2017 Wiley-VCH Verlag GmbH & Co. KGaA, Weinheim.

  15. Geochemical site-selection criteria for HLW repositories in Europe and North America

    International Nuclear Information System (INIS)

    Savage, David; Arthur, Randolph C.; Sasamoto, Hiroshi; Shibata, Masahiro; Yui, Mikazu

    2000-01-01

    Geochemical as well as socio-economic issues associated with the selection of potential sites to host a high-level nuclear waste repository have received considerable attention in repository programs in Europe (Belgium, Finland, France, Germany, Spain, Sweden, Switzerland and the U.K.) and North America (Canada and the United States). The objective of the present study is to summarize this international experience with particular emphasis on geochemical properties that factor into the adopted site-selection strategies. Results indicate that the geochemical properties of a site play a subordinate role, at best, to other geotechnical properties in the international site-selection approaches. In countries where geochemical properties are acknowledged in the site-selection approach, requirements are stated qualitatively and tend to focus on associated impacts on the stability of the engineered barrier system and on radionuclide transport. Site geochemical properties that are likely to control the long-term stability of geochemical conditions and radionuclide migration behavior are unspecified, however. This non-prescriptive approach may be reasonable for purposes of screening among potential sites, but a better understanding of site properties that are most important in controlling the long-term geochemical evolution of the site over a range of possible scenarios would enable the potential sites to be ranked in terms of their suitability to host a repository. (author)

  16. Field site selection: getting it right first time around

    NARCIS (Netherlands)

    Malcolm, Colin A.; El Sayed, Badria; Babiker, Ahmed; Girod, Romain; Fontenille, Didier; Knols, Bart G. J.; Nugud, Abdel Hameed; Benedict, Mark Q.

    2009-01-01

    The selection of suitable field sites for integrated control of Anopheles mosquitoes using the sterile insect technique (SIT) requires consideration of the full gamut of factors facing most proposed control strategies, but four criteria identify an ideal site: 1) a single malaria vector, 2) an

  17. Competing land use in the reserve site selection problem

    NARCIS (Netherlands)

    Langevelde, van F.; Schotman, A.; Claassen, G.D.H.; Sparenburg, G.A.

    2000-01-01

    The objective of this paper is to present an approach that addresses competing land uses in the reserve site selection problem. This approach is implemented in a spatial optimization model for conservation planning in human-dominated landscapes: MENTOR. This model allocates new sites as stepping

  18. Tunnel-Site Selection by Remote Sensing Techniques

    Science.gov (United States)

    A study of the role of remote sensing for geologic reconnaissance for tunnel-site selection was commenced. For this study, remote sensing was defined...conventional remote sensing . Future research directions are suggested, and the extension of remote sensing to include airborne passive microwave

  19. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2005-09-30

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004.

  20. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    International Nuclear Information System (INIS)

    2005-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004

  1. Periodical cicadas use light for oviposition site selection.

    Science.gov (United States)

    Yang, Louie H

    2006-12-07

    Organisms use incomplete information from local experience to assess the suitability of potential habitat sites over a wide range of spatial and temporal scales. Although ecologists have long recognized the importance of spatial scales in habitat selection, few studies have investigated the temporal scales of habitat selection. In particular, cues in the immediate environment may commonly provide indirect information about future habitat quality. In periodical cicadas (Magicicada spp.), oviposition site selection represents a very long-term habitat choice. Adult female cicadas insert eggs into tree branches during a few weeks in the summer of emergence, but their oviposition choices determine the underground habitats of root-feeding nymphs over the following 13 or 17 years. Here, field experiments are used to show that female cicadas use the local light environment of host trees during the summer of emergence to select long-term host trees. Light environments may also influence oviposition microsite selection within hosts, suggesting a potential behavioural mechanism for associating solar cues with host trees. In contrast, experimental nutrient enrichment of host trees did not influence cicada oviposition densities. These findings suggest that the light environments around host trees may provide a robust predictor of host tree quality in the near future. This habitat selection may influence the spatial distribution of several cicada-mediated ecological processes in eastern North American forests.

  2. Selecting a Sustainable Disinfection Technique for Wastewater Reuse Projects

    Directory of Open Access Journals (Sweden)

    Jorge Curiel-Esparza

    2014-09-01

    Full Text Available This paper presents an application of the Analytical Hierarchy Process (AHP by integrating a Delphi process for selecting the best sustainable disinfection technique for wastewater reuse projects. The proposed methodology provides project managers a tool to evaluate problems with multiple criteria and multiple alternatives which involve non-commeasurable decision criteria, with expert opinions playing a major role in the selection of these treatment technologies. Five disinfection techniques for wastewater reuse have been evaluated for each of the nine criteria weighted according to the opinions of consulted experts. Finally, the VIKOR method has been applied to determine a compromise solution, and to establish the stability of the results. Therefore, the expert system proposed to select the optimal disinfection alternative is a hybrid method combining the AHP with the Delphi method and the VIKOR technique, which is shown to be appropriate in realistic scenarios where multiple stakeholders are involved in the selection of a sustainable disinfection technique for wastewater reuse projects.

  3. METHODS OF SELECTING THE EFFECTIVE MODELS OF BUILDINGS REPROFILING PROJECTS

    Directory of Open Access Journals (Sweden)

    Александр Иванович МЕНЕЙЛЮК

    2016-02-01

    Full Text Available The article highlights the important task of project management in reprofiling of buildings. It is expedient to pay attention to selecting effective engineering solutions to reduce the duration and cost reduction at the project management in the construction industry. This article presents a methodology for the selection of efficient organizational and technical solutions for the reconstruction of buildings reprofiling. The method is based on a compilation of project variants in the program Microsoft Project and experimental statistical analysis using the program COMPEX. The introduction of this technique in the realigning of buildings allows choosing efficient models of projects, depending on the given constraints. Also, this technique can be used for various construction projects.

  4. SAR Subsets for Selected Field Sites, 2007-2010

    Data.gov (United States)

    National Aeronautics and Space Administration — ABSTRACT: This data set provides Synthetic Aperture Radar (SAR) images for 42 selected sites from various terrestrial ecology and meteorological monitoring networks...

  5. SAR Subsets for Selected Field Sites, 2007-2010

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set provides Synthetic Aperture Radar (SAR) images for 42 selected sites from various terrestrial ecology and meteorological monitoring networks including...

  6. Chapter 3: Design of the Saber-Tooth Project.

    Science.gov (United States)

    Ward, Phillip

    1999-01-01

    Used data from interviews, surveys, and document analysis to describe the methods and reform processes of the Saber Tooth Project, examining selection of sites; demographics (school sites, teachers, data sources, and project assumptions); and project phases (development, planning, implementation, and support). The project's method of reform was…

  7. Yucca Mountain Site Characterization Project bibliography, 1992--1994. Supplement 4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-06-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy`s Energy Science and Technology Database from January 1, 1992, through December 31, 1993. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization`s list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it. Earlier information on this project can be found in the first bibliography DOE/TIC-3406, which covers 1977--1985, and its three supplements DOE/OSTI-3406(Suppl.1), DOE/OSTI-3406(Suppl.2), and DOE/OSTI-3406(Suppl.3), which cover information obtained during 1986--1987, 1988--1989, and 1990--1991, respectively. All entries in the bibliographies are searchable online on the NNW database file. This file can be accessed through the Integrated Technical Information System (ITIS) of the US Department of Energy (DOE).

  8. Yucca Mountain Site Characterization Project bibliography, 1992--1993. Supplement 4

    International Nuclear Information System (INIS)

    1992-06-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Energy Science and Technology Database from January 1, 1992, through December 31, 1993. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it. Earlier information on this project can be found in the first bibliography DOE/TIC-3406, which covers 1977--1985, and its three supplements DOE/OSTI-3406(Suppl.1), DOE/OSTI-3406(Suppl.2), and DOE/OSTI-3406(Suppl.3), which cover information obtained during 1986--1987, 1988--1989, and 1990--1991, respectively. All entries in the bibliographies are searchable online on the NNW database file. This file can be accessed through the Integrated Technical Information System (ITIS) of the US Department of Energy (DOE)

  9. Project M: Scale Model of Lunar Landing Site of Apollo 17

    Science.gov (United States)

    O'Brien, Hollie; Crain, Timothy P.

    2010-01-01

    The basis of the project was creating a scale model representation of the Apollo 17 lunar landing site. Vital components included surface slope characteristics, crater sizes and locations, prominent rocks, and lighting conditions. The model was made for Project M support when evaluating approach and terminal descent as well as when planning surface operations with respect to the terrain. The project had five main mi lestones during the length of the project. The first was examining the best method to use to re-create the Apollo 17 landing site and then reviewing research fmdings with Dr. Tim Crain and EO staff which occurred on June 25, 2010 at a meeting. The second step was formulating a construction plan, budget, and schedule and then presenting the plan for authority to proceed which occurred on July 6,2010. The third part was building a prototype to test materials and building processes which were completed by July 13, 2010. Next was assembling the landing site model and presenting a mid-term construction status report on July 29, 2010. The fifth and final milestone was demonstrating the model and presenting an exit pitch which happened on August 4, 2010. The project was very technical: it needed a lot of research about moon topography, lighting conditions and angles of the sun on the moon, Apollo 17, and Autonomous Landing and Hazard Avoidance Technology (ALHAT), before starting the actual building process. This required using Spreadsheets, searching internet sources and conducting personal meetings with project representatives. This information assisted the interns in deciding the scale of the model with respect to cracks, craters and rocks and their relative sizes as the objects mentioned could interfere with any of the Lunar Landers: Apollo, Project M and future Landers. The project concluded with the completion of a three dimensional scale model of the Apollo 17 Lunar landing site. This model assists Project M members because they can now visualize

  10. The site selection process for a spent fuel repository in Finland. Summary report

    Energy Technology Data Exchange (ETDEWEB)

    McEwen, T. [EnvirosQuantiSci (United Kingdom); Aeikaes, T. [Posiva Oy, Helsinki (Finland)

    2000-12-01

    This Summary Report describes the Finnish programme for the selection and characterisation of potential sites for the deep disposal of spent nuclear fuel and explains the process by which Olkiluoto has been selected as the single site proposed for the development of a spent fuel disposal facility. Its aim is to provide an overview of this process, initiated almost twenty years ago, which has entered its final phase. It provides information in three areas: a review of the early site selection criteria, a description of the site selection process, including all the associated site characterisation work, up to the point at which a single site was selected and an outline of the proposed work, in particular that proposed underground, to characterise further the Olkiluoto site. In 1983 the Finnish Government made a policy decision on the management of nuclear waste in which the main goals and milestones for the site selection programme for the deep disposal of spent fuel were presented. According to this decision several site candidates, whose selection was to be based on careful studies of the whole country, should be characterised and the site for the repository selected by the end of the year 2000. This report describes the process by which this policy decision has been achieved. The report begins with a discussion of the definition of the geological and environmental site selection criteria and how they were applied in order to select a small number of sites, five in all, that were to be the subject of the preliminary investigations. The methods used to investigate these sites and the results of these investigations are described, as is the evaluation of the results of these investigations and the process used to discard two of the sites and continue more detailed investigations at the remaining three. The detailed site investigations that commenced in 1993 are described with respect to the overall strategy followed and the investigation techniques applied. The

  11. Enabling Interoperable and Selective Data Sharing among Social Networking Sites

    Science.gov (United States)

    Shin, Dongwan; Lopes, Rodrigo

    With the widespread use of social networking (SN) sites and even introduction of a social component in non-social oriented services, there is a growing concern over user privacy in general, how to handle and share user profiles across SN sites in particular. Although there have been several proprietary or open source-based approaches to unifying the creation of third party applications, the availability and retrieval of user profile information are still limited to the site where the third party application is run, mostly devoid of the support for data interoperability. In this paper we propose an approach to enabling interopearable and selective data sharing among SN sites. To support selective data sharing, we discuss an authenticated dictionary (ADT)-based credential which enables a user to share only a subset of her information certified by external SN sites with applications running on an SN site. For interoperable data sharing, we propose an extension to the OpenSocial API so that it can provide an open source-based framework for allowing the ADT-based credential to be used seamlessly among different SN sites.

  12. Geological and geophysical investigations in the selection and characterization of the disposal site for high-level nuclear waste in Finland

    Energy Technology Data Exchange (ETDEWEB)

    Paulamaki, S.; Paananen, M.; Kuivamaki, A. [Geological Survey of Finland, Espoo (Finland); Wikstrom, L. [Posiva Oy, Olkiluoto (Finland)], e-mail: seppo.paulamaki@gtk.fi

    2011-07-01

    Two power companies, Teollisuuden Voima Oy (TVO) and Fortum Power and Heat Oy, are preparing for the final disposal of spent nuclear fuel deep in the Finnish bedrock. In the initial phase of the site selection process in the late 1970s and early 1980s, the Geological Survey of Finland (GTK) examined the general bedrock factors that would have to be taken into account in connection with final disposal with reference to the international guidelines adapted to Finnish conditions. On the basis of extensive basic research data, it was concluded that it is possible to find a potential disposal site that fulfils the geological safety criteria. In the subsequent site selection survey covering the whole of Finland, carried out by GTK in 1983-1985, 101 potential investigation areas were discovered. Eventually, five areas were selected by TVO for preliminary site investigations: Romuvaara and Veitsivaara in the Archaean basement complex, Kivetty and Syyry in the Proterozoic granitoid area, and Olkiluoto (TVO's NPP site) in the Proterozoic migmatite area. The preliminary site investigations at the selected sites in 1987-1992 comprised deep drillings together with geological, geophysical, hydrogeological and hydrogeochemical investigations. A conceptual geological bedrock model was constructed for each site, including lithology, fracturing, fracture zones and hydrogeological conditions. On the basis of preliminary site investigations, TVO selected Romuvaara, Kivetty and Olkiluoto for detailed site investigations to be carried out during 1993-2000. After the feasibility studies, the island of Haestholmen, where Fortum's Loviisa nuclear power plant is located, was added to the list of potential disposal sites. In the detailed site investigations, additional data on bedrock were gathered, the previous conceptual geological, hydrogeological and hydrogeochemical models were complemented, the rock mechanical properties of the bedrock were examined, and the constructability

  13. Geological and geophysical investigations in the selection and characterization of the disposal site for high-level nuclear waste in Finland

    Energy Technology Data Exchange (ETDEWEB)

    Paulamaki, S; Paananen, M; Kuivamaki, A [Geological Survey of Finland, Espoo (Finland); Wikstrom, L. [Posiva Oy, Olkiluoto (Finland)], e-mail: seppo.paulamaki@gtk.fi

    2011-07-01

    Two power companies, Teollisuuden Voima Oy (TVO) and Fortum Power and Heat Oy, are preparing for the final disposal of spent nuclear fuel deep in the Finnish bedrock. In the initial phase of the site selection process in the late 1970s and early 1980s, the Geological Survey of Finland (GTK) examined the general bedrock factors that would have to be taken into account in connection with final disposal with reference to the international guidelines adapted to Finnish conditions. On the basis of extensive basic research data, it was concluded that it is possible to find a potential disposal site that fulfils the geological safety criteria. In the subsequent site selection survey covering the whole of Finland, carried out by GTK in 1983-1985, 101 potential investigation areas were discovered. Eventually, five areas were selected by TVO for preliminary site investigations: Romuvaara and Veitsivaara in the Archaean basement complex, Kivetty and Syyry in the Proterozoic granitoid area, and Olkiluoto (TVO's NPP site) in the Proterozoic migmatite area. The preliminary site investigations at the selected sites in 1987-1992 comprised deep drillings together with geological, geophysical, hydrogeological and hydrogeochemical investigations. A conceptual geological bedrock model was constructed for each site, including lithology, fracturing, fracture zones and hydrogeological conditions. On the basis of preliminary site investigations, TVO selected Romuvaara, Kivetty and Olkiluoto for detailed site investigations to be carried out during 1993-2000. After the feasibility studies, the island of Haestholmen, where Fortum's Loviisa nuclear power plant is located, was added to the list of potential disposal sites. In the detailed site investigations, additional data on bedrock were gathered, the previous conceptual geological, hydrogeological and hydrogeochemical models were complemented, the rock mechanical properties of the bedrock were examined, and the constructability and the

  14. Selection of radioactive waste disposal site considering natural processes

    International Nuclear Information System (INIS)

    Nakamura, H.

    1991-01-01

    To dispose the radioactive waste, it is necessary to consider the transfer of material in natural environment. The points of consideration are 1) Long residence time of water 2) Independence of biosphere from the compartment containing the disposal site in the natural hydrologic cycle 3) Dilution with the natural inactive isotope or the same group of elements. Isotope dilution for 129 I and 14 C can be expected by proper selection of the site. 241 Am and 239 Pu will be homogenized into soil or sediment with insoluble elements such as iron and aluminium. For 237 Np and 99 Tc anionic condition is important for the selection. From the point of view of hydrologic cycle, anoxic dead water zone avoiding beneath mountain area is preferable for the disposal site. (author)

  15. Artificial Intelligence Support for Landing Site Selection on Mars

    Science.gov (United States)

    Rongier, G.; Pankratius, V.

    2017-12-01

    Mars is a key target for planetary exploration; a better understanding of its evolution and habitability requires roving in situ. Landing site selection is becoming more challenging for scientists as new instruments generate higher data volumes. The involved engineering and scientific constraints make site selection and the anticipation of possible onsite actions into a complex optimization problem: there may be multiple acceptable solutions depending on various goals and assumptions. Solutions must also account for missing data, errors, and potential biases. To address these problems, we propose an AI-informed decision support system that allows scientists, mission designers, engineers, and committees to explore alternative site selection choices based on data. In particular, we demonstrate first results of an exploratory case study using fuzzy logic and a simulation of a rover's mobility map based on the fast marching algorithm. Our system computes favorability maps of the entire planet to facilitate landing site selection and allows a definition of different configurations for rovers, science target priorities, landing ellipses, and other constraints. For a rover similar to NASA's Mars 2020 rover, we present results in form of a site favorability map as well as four derived exploration scenarios that depend on different prioritized scientific targets, all visualizing inherent tradeoffs. Our method uses the NASA PDS Geosciences Node and the NASA/ICA Integrated Database of Planetary Features. Under common assumptions, the data products reveal Eastern Margaritifer Terra and Meridiani Planum to be the most favorable sites due to a high concentration of scientific targets and a flat, easily navigable surface. Our method also allows mission designers to investigate which constraints have the highest impact on the mission exploration potential and to change parameter ranges. Increasing the elevation limit for landing, for example, provides access to many additional

  16. Occurrence Prospect of HDR and Target Site Selection Study in Southeastern of China

    Science.gov (United States)

    Lin, W.; Gan, H.

    2017-12-01

    Hot dry rock (HDR) geothermal resource is one of the most important clean energy in future. Site selection a HDR resource is a fundamental work to explore the HDR resources. This paper compiled all the HDR development projects domestic and abroad, and summarized the location of HDR geothermal geological index. After comparing the geological background of HDR in the southeast coastal area of China, Yangjiang Xinzhou in Guangdong province, Leizhou Peninsula area, Lingshui in Hainan province and Huangshadong in Guangzhou were selected from some key potential target area along the southeast coast of China. Deep geothermal field model of the study area is established based on the comprehensive analysis of the target area of deep geothermal geological background and deep thermal anomalies. This paper also compared the hot dry rock resources target locations, and proposed suggestions for the priority exploration target area and exploration scheme.

  17. CosmoQuest Year 1.5: Citizen Scientist Behaviors and Site Usage Across Multiple Projects

    Science.gov (United States)

    Gugliucci, Nicole E.; Gay, P. L.; Bracey, G.; CosmoQuest Team

    2013-06-01

    CosmoQuest launched as a citizen science portal in January 2012 and has since expanded to include three projects in planetary surface mapping, one completed project searching for KBOs, and several more on the way with various astrophysical science goals. We take a close look at how our users move through the site, how much time they spend on various tasks, project retention rate, and how many use multiple projects on the site. We are also piloting a citizen science motivation survey given to random site users to find out why citizen scientists join new projects and continue to participate. This is part of a larger project using online and real-life interactions to study citizen scientist behaviors, motivations, and learning with a goal of building better community with researchers, volunteers, educators, and developers.

  18. Technical Assessment Of Selection Of A Waste Disposal Site

    International Nuclear Information System (INIS)

    Lee, Bong Hun

    1992-04-01

    This book gives overall descriptions of technical assessment of selection of a waste disposal site, which deals with standard of selection on incinerator of city waste, the method over assessment of selection of incinerator in city waste, prerequisite of technical assessment for selection of incinerator, waste incinerator and related equipment such as form, structure, quality of material, ventilation device, plumbing system and electrical installation, and total plan like plan of construction and a measure taken against environmental pollution.

  19. In vitro site selection of a consensus binding site for the Drosophila melanogaster Tbx20 homolog midline.

    Directory of Open Access Journals (Sweden)

    Nima Najand

    Full Text Available We employed in vitro site selection to identify a consensus binding sequence for the Drosophila melanogaster Tbx20 T-box transcription factor homolog Midline. We purified a bacterially expressed T-box DNA binding domain of Midline, and used it in four rounds of precipitation and polymerase-chain-reaction based amplification. We cloned and sequenced 54 random oligonucleotides selected by Midline. Electromobility shift-assays confirmed that 27 of these could bind the Midline T-box. Sequence alignment of these 27 clones suggests that Midline binds as a monomer to a consensus sequence that contains an AGGTGT core. Thus, the Midline consensus binding site we define in this study is similar to that defined for vertebrate Tbx20, but differs from a previously reported Midline binding sequence derived through site selection.

  20. Project plans for transuranic waste at small quantity sites in the Department of Energy comples-10522

    International Nuclear Information System (INIS)

    Mctaggart, Jerri Lynne; Lott, Sheila; Gadbury, Casey

    2009-01-01

    Los Alamos National Laboratory, Carlsbad Office (LANL-CO), has been tasked to write Project Plans for all of the Small Quantity Sites (SQS) with defense related Transuranic (TRU) waste in the Department of Energy (DOE) complex. Transuranic Work-Off Plans were precursors to the Project Plans. LANL-CO prepared a Work-Off Plan for each small quantity site. The Work-Off Plan that identified issues, drivers, schedules, and inventory. Eight sites have been chosen to deinventory their legacy TRU waste; Bettis Atomic Power Laboratory, General Electric-Vallecitos Nuclear Center, Lawrence Berkeley National Laboratory, Lawrence Livermore National Laboratory-Area 300, Nevada Test Site, Nuclear Radiation Development, Sandia National Laboratory, and the Separations Process Research Unit. Each plan was written for contact and/or remote handled waste if present at the site. These project plans will assist the small quantity sites to ship legacy TRU waste offsite and de-inventory the site of legacy TRU waste. The DOE is working very diligently to reduce the nuclear foot print in the United States. Each of the eight SQSs will be de-inventoried of legacy TRU waste during a campaign that ends September 2011. The small quantity sites have a fraction of the waste that large quantity sites possess. During this campaign, the small quantity sites will package all of the legacy TRU waste and ship to Idaho or directly to the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico. The sites will then be removed from the Transuranic Waste Inventory if they are de-inventoried of all waste. Each Project Plan includes the respective site inventory report, schedules, resources, drivers and any issues. These project plans have been written by the difficult waste team and will be approved by each site. Team members have been assigned to each site to write site specific project plans. Once the project plans have been written, the difficult team members will visit the sites to ensure nothing has

  1. A Methodology for Collective Evaluation and Selection of Industrial R&D Projects

    OpenAIRE

    Muhittin Oral; Ossama Kettani; Pascal Lang

    1991-01-01

    This paper proposes a methodology for evaluating and selecting R&D projects in a collective decision setting, especially useful at sectorial and national levels. It consists of two major phases: Evaluation and Selection. The evaluation process repeatedly uses mathematical programming models to determine the "relative values" of a given R&D project from the viewpoint of the other R&D projects. The selection process of R&D projects is based on these "relative values" and is done through a model...

  2. Territory and nest site selection patterns by Grasshopper Sparrows in southeastern Arizona

    Science.gov (United States)

    Ruth, Janet M.; Skagen, Susan K.

    2017-01-01

    Grassland bird populations are showing some of the greatest rates of decline of any North American birds, prompting measures to protect and improve important habitat. We assessed how vegetation structure and composition, habitat features often targeted for management, affected territory and nest site selection by Grasshopper Sparrows (Ammodramus savannarum ammolegus) in southeastern Arizona. To identify features important to males establishing territories, we compared vegetation characteristics of known territories and random samples on 2 sites over 5 years. We examined habitat selection patterns of females by comparing characteristics of nest sites with territories over 3 years. Males selected territories in areas of sparser vegetation structure and more tall shrubs (>2 m) than random plots on the site with low shrub densities. Males did not select territories based on the proportion of exotic grasses. Females generally located nest sites in areas with lower small shrub (1–2 m tall) densities than territories overall when possible and preferentially selected native grasses for nest construction. Whether habitat selection was apparent depended upon the range of vegetation structure that was available. We identified an upper threshold above which grass structure seemed to be too high and dense for Grasshopper Sparrows. Our results suggest that some management that reduces vegetative structure may benefit this species in desert grasslands at the nest and territory scale. However, we did not assess initial male habitat selection at a broader landscape scale where their selection patterns may be different and could be influenced by vegetation density and structure outside the range of values sampled in this study.

  3. Growing risk avoidance in Asian oncology site selection: how trends in site selection are limiting growth of the Asia cancer trial landscape

    Directory of Open Access Journals (Sweden)

    Horsburgh D

    2013-12-01

    Full Text Available David Horsburgh,1 Yi-Chen Josey Lee,2 Elvira Zenaida Lansang,1 Ken J Lee,3 Malcolm Ogg,4 Karen Wai1 1Feasibility and Site Identification Asia, Quintiles East Asia Pte Ltd, Singapore; 2Feasibility and Site Identification Asia, Quintiles East Asia Pte Ltd, Taipei, Taiwan; 3Site Services Asia, Quintiles East Asia Pte Ltd, Singapore; 4Global Integrated Site Services, Quintiles, Green Park, Reading, Berkshire, United Kingdom Background: Asia-Pacific represents the fastest-growing region for clinical trials, with growth in oncology studies being a strong contributor. Such demand has seen a rapid change in Asia's total site pool and the number of experienced and inexperienced, or naïve, sites being activated. Given the perceived risks involved with naïve sites, this study aims to investigate changes in the rate of naïve site selection and how this risk management may influence future growth within the region. Methods: Rates of total naïve and experienced sites initiated per year, per protocol, and the relative contribution of each to the yearly site total were analyzed. Data was collected from Quintiles internal metrics as well as from the publicly available ClinicalTrials.gov database and was filtered to include oncology studies involving at least one Asian country, between the years 2000 and 2012. Results and discussion: Despite a general increase in the number of sites activated overall, the contribution of naïve sites to the yearly total fell to 20% in 2012. Experienced sites were heavily favored, with reliance on the existing site network preferred to expansion through naïve sites. This is likely a result of the perceived challenges with using inexperienced sites and the industry desire to avoid this risk. However, fluctuations in naïve sites activation suggest that the limited level of growth in the site pool may not be enough to sustain demand, with sudden outreaches to naïve sites necessary as current site pool capacity is occasionally

  4. Rock mass mechanical property estimations for the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Lin, M.; Hardy, M.P.; Bauer, S.J.

    1993-06-01

    Rock mass mechanical properties are important in the design of drifts and ramps. These properties are used in evaluations of the impacts of thermomechanical loading of potential host rock within the Yucca Mountain Site Characterization Project. Representative intact rock and joint mechanical properties were selected for welded and nonwelded tuffs from the currently available data sources. Rock mass qualities were then estimated using both the Norwegian Geotechnical Institute (Q) and Geomechanics Rating (RMR) systems. Rock mass mechanical properties were developed based on estimates of rock mass quality, the current knowledge of intact properties, and fracture/joint characteristics. Empirical relationships developed to correlate the rock mass quality indices and the rock mass mechanical properties were then used to estimate the range of rock mass mechanical properties

  5. Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem Erzaij

    2016-06-01

    Full Text Available Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public and private companies in Iraqi construction sector were employed to identify main criteria and sub criteria for supplier selection and their priorities.The main criteria identified were quality of product, commercial aspect, delivery, reputation and position, and system quality . An effective technique in multiple criteria decision making (MCDM as analytical hierarchy process (AHP have been used to get importance weights of criteria based on experts judgment. Thereafter, a management software system for Evaluation and Selection of Engineering Equipment Suppliers (ESEES has been developed based on the results obtained from AHP. This model was validated in a case study at municipality of Baghdad involved actual cases of selection pumps suppliers for infrastructure projects .According to experts, this model can improve the current process followed in the supplier selection and aid decision makers to adopt better choices in the domain of selection engineering equipment suppliers.

  6. Approaches to LLW disposal site selection and current progress of host states

    International Nuclear Information System (INIS)

    Walsh, J.J.; Kerr, T.A.

    1990-11-01

    In accordance with the Low-Level Radioactive Waste Policy Amendments Act of 1985 and under the guidance of 10 CFR 61, States have begun entering into compacts to establish and operate regional disposal facilities for low-level radioactive waste. The progress a state makes in implementing a process to identify a specific location for a disposal site is one indication of the level of a state's commitment to meeting its responsibilities under Federal law and interstate compact agreements. During the past few years, several States have been engaged in site selection processes. The purpose of this report is to summarize the site selection approaches of some of the Host States (California, Michigan, Nebraska, New York, North Carolina, Texas, and Illinois), and their progress to date. An additional purpose of the report is to discern whether the Host States's site selection processes were heavily influenced by any common factors. One factor each state held in common was that political and public processes exerted a powerful influence on the site selection process at virtually every stage. 1 ref

  7. Site observational work plan for the UMTRA Project site at Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1994-09-01

    The Ambrosia Lake Uranium Mill Tailings Remedial Action (UMTRA) Project site is within the Grants Mineral Belt and was one of numerous uranium mills supplied by many local mines. Ground water contamination at the site occurred as a result of uranium mill operations. The potential for impacts to human health and the environment from contaminated ground water currently does not exist. No domestic or livestock wells accessing ground water from the uppermost aquifer have been identified within a 5 mile radius from the site. Therefore, no current exposure pathways to humans, livestock, or wildlife exist, nor are any foreseen. The proposed ground water compliance strategy under consideration for application at the Ambrosia Lake site is to perform no remediation, based on the application of supplemental standards because the ground water has ''limited use.''

  8. 24 CFR 983.57 - Site selection standards.

    Science.gov (United States)

    2010-04-01

    ...; (vi) If the poverty rate in the area where the proposed PBV development will be located is greater... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Site selection standards. 983.57 Section 983.57 Housing and Urban Development Regulations Relating to Housing and Urban Development...

  9. Procurement selection criteria for projects in the public sector: evidence from Nigeria

    Directory of Open Access Journals (Sweden)

    Richard Ajayi Jimoh

    2016-12-01

    Full Text Available The selection of suitable procurement practice for construction projects is a very complex and demanding tasks for stakeholders in the construction industry. In spite of the overabundance of techniques and tools accessible to the stakeholders in selecting an appropriate procurement method, clients are faced with the decision as to which of the selection criteria can be adopted for a given construction project to achieve project goals and objectives. This paper focused on evaluating the existing procurement methods being practised in the Nigerian construction industry with a view to identifying and establishing the parameters for selection that will improve contract delivery systems. In this research, quantitative approach was used to collect data from 420 contractors, consultants and clients based in the Federal Capital Territory, Abuja where large numbers of building projects are being procured. The findings revealed six most commonly considered criteria and deduced that, the quality, cost and duration of the project determines the type of procurement method to adopt. It is therefore stated that in selecting any particular procurement method for building construction projects, the complexity of such project should be clearly defined and the other performance indicators be given adequate consideration for a successful project delivery that will enhance the achievement of the client’s goal.

  10. Study of decision framework of offshore wind power station site selection based on ELECTRE-III under intuitionistic fuzzy environment: A case of China

    International Nuclear Information System (INIS)

    Wu, Yunna; Zhang, Jinying; Yuan, Jianping; Geng, Shuai; Zhang, Haobo

    2016-01-01

    Highlights: • A novel MCDM framework is applied to assist group decision in OWPS site selection. • The index system consisting of veto and evaluation criteria is constructed. • A case study is carried five sites in coastal areas of Shandong in East China. - Abstract: Offshore wind power projects have been rapidly proposed in China due to policy promotion. Site selection immensely decides the success of any offshore wind power development and is a complex multi-criteria decision making (MCDM) problem. However, canonical MCDM methods tend to fail the site selection process due to the following three problems. Firstly, the compensation problem exists in information processing. Secondly, there exists the problem of incomplete utilization of decision information and information loss in the decision process. Thirdly, the interaction problem in the fuzzy environment is easy to be ignored. To deal with the above problems, this study builds a framework for offshore wind farm site selection decision utilizing Elimination et Choix Traduisant la Realité-III (ELECTRE-III) in the intuitionistic fuzzy environment. First of all, the comprehensive index system of OWPS site selection consisting of veto criteria and evaluation criteria is constructed. Then, the intuitionistic fuzzy set is used in the group decision for the decision makers to express the imperfect knowledge. Moreover, the generalized intuitionistic fuzzy ordered weighted geometric interaction averaging (GIFWGIA) operator is applied to deal with the interaction problem. Together with the likelihood-based valued comparisons, imprecise decision information is reasonably used and information loss problem is rationally avoided. Then a case of China is studied based on the proposed framework, demonstrating the site selection methodology valid and practical. This study implements evaluation method for offshore wind power site selection and also provides a theoretical basis for the development of offshore wind power

  11. Project governance: selected South African government experiments

    Directory of Open Access Journals (Sweden)

    G. van der Walt

    2008-07-01

    Full Text Available Some form of accountability and power structure binds all organisations. Such structures are typically referred to as the “governance” structure of the organisation. In organisations that have relatively mature project applications and methodologies in place, governance mechanisms are established on more permanent bases. With its focus on performance, results and outcomes, project governance establishes decision-making structures, as well as accountability and responsibility mechanisms in public institutions to oversee projects. As government institutions increasingly place emphasis on project applications for policy implementation and service delivery initiatives, mechanisms or structures should be established to facilitate clear interfaces between the permanent organisation and the temporary project organisation. Such mechanisms or structures should enhance the governance of projects, that is, the strategic alignment of projects, the decentralisation of decision- making powers, rapid resource allocation, and the participation of external stakeholders. The purpose of this article is to explore the concept “project governance”, and to highlight examples of project governance as applied in selected government departments in provincial and national spheres. This would enable the establishment of best practice examples and assist to develop benchmarks for effective project applications for service delivery improvement.

  12. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  13. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE's goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology

  14. Draft site characterization analysis of the site characterization report for the Basalt Waste Isolation Project, Hanford, Washington Site. Main report and Appendices A through D

    International Nuclear Information System (INIS)

    1983-03-01

    On November 12, 1982, the US Department of Energy submitted to the US Nuclear Regulatory Commission the Site Characterization Report for the Basalt Waste Isolation Project (DOE/RL 82-3). The Basalt Waste Isolation Project is located on DOE's Hanford Reservation in the State of Washington. NUREG-0960 contains the detailed analysis, by the NRC staff, of the site characterization report. Supporting technical material is contained in Appendices A through W

  15. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action(UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1996). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will be evaluated in the site-specific environmental assessment to determine potential environmental impacts and provide stakeholders a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  16. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1996-03-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action(UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1996). The DOE's goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will be evaluated in the site-specific environmental assessment to determine potential environmental impacts and provide stakeholders a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology

  17. Bayes Empirical Bayes Inference of Amino Acid Sites Under Positive Selection

    DEFF Research Database (Denmark)

    Yang, Ziheng; Wong, Wendy Shuk Wan; Nielsen, Rasmus

    2005-01-01

    , with > 1 indicating positive selection. Statistical distributions are used to model the variation in among sites, allowing a subset of sites to have > 1 while the rest of the sequence may be under purifying selection with ... probabilities that a site comes from the site class with > 1. Current implementations, however, use the naive EB (NEB) approach and fail to account for sampling errors in maximum likelihood estimates of model parameters, such as the proportions and ratios for the site classes. In small data sets lacking...... information, this approach may lead to unreliable posterior probability calculations. In this paper, we develop a Bayes empirical Bayes (BEB) approach to the problem, which assigns a prior to the model parameters and integrates over their uncertainties. We compare the new and old methods on real and simulated...

  18. Transition from site selection to site confirmation phase: New challenge to Posiva's communication and public involvement

    International Nuclear Information System (INIS)

    Seppaelae, Timo

    2001-01-01

    In Finland, Posiva Oy is responsible for the final disposal of spent nuclear fuel. In the 1990's investigations have been carried out on four intended sites for final disposal. Posiva implemented Environmental Impact Assessment (EIA) on the investigation sites in 1997-1999. The results of the EIA procedure were published in the EIA report which was attached to the application filed to the Government in May 1999 for a policy decision on the construction of the final disposal facility in Olkiluoto in the municipality of Eurajoki. In December 2000, the Finnish Government made a favourable policy decision ( D ecision in Principle ) on the construction of final disposal facility for spent nuclear fuel in Olkiluoto. According to the decision, the facility is in line with the overall good of the society. According to the Government's decision the prerequisites of the policy decision had been met. The municipality of Eurajoki supported the construction of the facility in Olkiluoto and STUK, the Radiation and Nuclear Safety Authority, also approved of the advancement of the project. The positive policy decision of the Government will still need to be ratified by the Parliament. The parliamentary proceedings of the policy decision will probably start in February 2001. The policy decision will make it possible for Posiva to concentrate the future site confirmation studies in Olkiluoto, Eurajoki, and construct an underground research facility there. The excavation of the research facility in the bedrock is planned to start in a few years' time. The construction of the final disposal facility is scheduled to start after the year 2010. The transition from the site selection to the site confirmation phase in Eurajoki means a new challenge not only to Posiva's research work but also to Posiva's communication. In addition to meeting the safety criteria, Posiva's activities shall in the future also meet all the criteria specified by the surrounding society

  19. Cleanup protocol for 226Ra-contaminated cobbly soil at UMTRA Project sites

    International Nuclear Information System (INIS)

    Gonzales, D.E.; Millard, J.B.; Miller, M.L.; Metzler, D.

    1994-01-01

    The nonuniform distribution of 226Ra and other radiological contamination of cobbly soil encountered on several Uranium Mill Tailings Remedial Action Project sites is presented and discussed, and the concomitant challenges to the intent and implementation of the U.S. Environmental Protection Agency's soil cleanup standards are noted. In response to technical assessments and information presented to the U.S. Nuclear Regulatory Commission by the U.S. Department of Energy, the Nuclear Regulatory Commission has recently resolved the dilemma by concluding that compliance with Environmental Protection Agency soil cleanup standards for cobby soil at Uranium Mill Tailings Remedial Action Project sites would be adequately attained using bulk radionuclide concentrations, instead of requiring that the radionuclide concentration of the finer soil fraction passing a No. 4 mesh sieve met the standards. A Nuclear Regulatory Commission-approved procedure developed for cobbly soil remediation is outlined and discussed. The site-specific implementation of this procedure at Uranium Mill Tailings Remedial Action Project sites containing cobbly soil is estimated to save millions of dollars

  20. West Valley Demonstration Project site environmental report for calendar year 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    The West Valley Demonstration Project (WVDP), the site of a US Department of Energy environmental cleanup activity operated by West Valley Nuclear Services Co., Inc., (WVNS), is in the process of solidifying liquid high-level radioactive waste remaining at the site after commercial nuclear fuel reprocessing was discontinued. The Project is located in Western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1996 by environmental monitoring personnel. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. Appendix A is a summary of the site environmental monitoring schedule. Appendix B lists the environmental permits and regulations pertaining to the WVDP. Appendices C through F contain summaries of data obtained during 1996 and are intended for those interested in more detail than is provided in the main body of the report.

  1. Nucleation of recrystallization at selected sites in deformed fcc metals

    DEFF Research Database (Denmark)

    Xu, Chaoling

    The objective of this thesis is to explore nucleation of recrystallization at selected sites in selected face-centered-cubic (FCC) metals, namely cold rolled columnar-grained nickel and high purity aluminum further deformed by indenting. Various techniques, including, optical microscopy, electron...... backscattered diffraction (EBSD), electron channeling contrast (ECC) and synchrotron X-ray technique, differential-aperture X-ray microscopy (DAXM), were used to characterize the microstructures, to explore nucleation sites, orientation relationships between nuclei and deformed microstructures, and nucleation...... mechanisms. In the cold rolled nickel samples, the preference of triple junctions (TJs) and grain boundaries (GBs) as nucleation sites is observed. The majorities of the nuclei have the same orientations as the surrounding matrix or are twin-related to a surrounding deformed grain. Only a few nuclei...

  2. Yucca Mountain Site Characterization Project Technical Data Catalog

    International Nuclear Information System (INIS)

    1992-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear, Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. Each new publication of the Technical Data Catalog supersedes the previous edition

  3. Yucca Mountain Site Characterization Project technical data catalog

    International Nuclear Information System (INIS)

    1992-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. Each new publication of the Technical Data Catalog supersedes the previous edition

  4. An analysis of project selection and assignment criteria of Danish tenders in Europe

    Directory of Open Access Journals (Sweden)

    Jasper Kranker Larsen

    2013-12-01

    Full Text Available Public construction agencies are one of the largest developers within the Danish construction industry, where such agencies own and develop new public construction projects. Most of these projects are put out in European tender. This study analyses the selection and assignment criteria employed by these agencies in different types of public sector projects. Some of the objectives pursued by the study include the determination of 1/ the selection and assignment criteria mostly used in Danish public tenders 2/ how different types of projects use selection and assignment criteria in the bidding process, and 3/ any significant difference between the use of selection and assignment criteria in Danish public construction projects. The study uses a quantitative research approach where 157 Danish public tender cases were selected from the European Tenders Electronic Daily database between the period: January 2010 to March 2013. Fisher's Exact Test was conducted to determine if there was any significant use of some selection and assignment criteria. The findings of the study showed that invited tenders with pre-qualification and lowest price in 69.8% of the tenders are the most used selection and assignment criteria, with little regard to project type.

  5. Site selection process for new nuclear power plants - a method to support decision making and improving public participation

    International Nuclear Information System (INIS)

    Martins, Vivian B.; Cunha, Tatiana S. da; Simoes Filho, Francisco Fernando Lamego; Lapa, Celso Marcelo F.

    2011-01-01

    The Brazilian Energy Plan (PNE 2030) that guides the Government in formulating its strategy for expanding energy supply by 2030 highlights the need for the Brazilian electrical system have more than 4,000 MW from nuclear sources by 2025. Therefore, the Government presented a proposal to build four more nuclear power plants with capacity of 1,000 MW each, at first, two in the Northeast and two in Southeast. The selection and site assessment are key parts of the installation process of a nuclear plant and may significantly affect the cost, public acceptance and safety of the facility during its entire life cycle. The result of this initial stage, it can even seriously affect program success. Wrong decisions in the process of site selection may also require a financial commitment to higher planned in a later phase of the project, besides causing extensive and expensive downtime. Select the location where these units will be built is not a trivial process, because involves the consideration of multiple criteria and judgments in addition to obtaining, organizing and managing a diverse range of data, both qualitative and quantitative, to assist in decision making and ensure that the site selected is the most appropriate in relation to safety and technical, economic and environmental feasibility. This paper presents an overview of the site selection process and its stages, the criteria involved in each step, the tools to support decision making that can be used and the difficulties in applying a formal process of decision making. Also discussed are ways to make the process more transparent and democratic, increasing public involvement as a way to improve acceptance and reduce opposition from various sectors of society, trying to minimize the expense and time involved in the implementation of undertakings of this kind. (author)

  6. Bibliography of publications related to the Yucca Mountain Site Characterization Project prepared by U.S. Geological Survey personnel through April 1991

    International Nuclear Information System (INIS)

    Glanzman, V.M.

    1991-01-01

    Personnel of the US Geological Survey have participated in nuclear-waste management studies in the State of Nevada since the mid-1970's. A bibliography of publications prepared principally for the US Department of Energy Yucca Mountain Site Characterization Project (formerly Nevada Nuclear Waste Storage Investigations) through April 1991 contains 475 entries in alphabetical order. The listing includes publications prepared prior to the inception of the Nevada Nuclear Waste Storage Investigations Project in April 1977 and selected publications of interest to the Yucca Mountain region. 480 refs

  7. Geotechnical conditions of Bulgaria and site selection for radioactive waste repository

    International Nuclear Information System (INIS)

    Iliev, I.; Tacheva, E.

    1993-01-01

    A comparative study of the complex structure of the Bulgarian lands and the engineering geological criteria for site selection of national repositories for high level radwastes is made. A detailed description of the following geotechnical conditions of Bulgaria's territory is given: genetic, lithological and engineering-geological types of rocks; physico-mechanical parameters of the most widespread rocky and semi-rocky engineering geological types; fissuring of the rocks; rock massifs; geodynamic processes. The number of promising variants for repositories have been classified according to the structure of the rock massif and the engineering-geological properties of the layers which are promising for the purpose. The following sites are investigated: 1) sites in one-type homogeneous rock massifs of high strength and elasticity; 2) sites of various type massifs with a promising layer of rocks with medium strength and elasticity; 3) sites in various type massifs with a promising layer of plastic rocks of low strength. It is concluded that the complexity of the geotechnical and other conditions in the territory of Bulgaria would predetermine the deficiency of the list of the properties required for the selected sites. The building up of engineering defence will be needed to offset that deficiency and their problems will be resolved after the specific site have been chosen. Geotechnical elements should be likewise envisaged within the general pattern of the monitoring needed. The designing, installing and putting into operation of the monitoring systems should be accomplished as early as the stage of the detailed investigation of the site selected. 19 refs., 2 suppls. (author)

  8. Site-controlled fabrication of silicon nanotips by indentation-induced selective etching

    Science.gov (United States)

    Jin, Chenning; Yu, Bingjun; Liu, Xiaoxiao; Xiao, Chen; Wang, Hongbo; Jiang, Shulan; Wu, Jiang; Liu, Huiyun; Qian, Linmao

    2017-12-01

    In the present study, the indentation-induced selective etching approach is proposed to fabricate site-controlled pyramidal nanotips on Si(100) surface. Without any masks, the site-controlled nanofabrication can be realized by nanoindentation and post etching in potassium hydroxide (KOH) solution. The effect of indentation force and etching time on the formation of pyramidal nanotips was investigated. It is found that the height and radius of the pyramidal nanotips increase with the indentation force or etching time, while long-time etching can lead to the collapse of the tips. The formation of pyramidal tips is ascribed to the anisotropic etching of silicon and etching stop of (111) crystal planes in KOH aqueous solution. The capability of this fabrication method was further demonstrated by producing various tip arrays on silicon surface by selective etching of the site-controlled indent patterns, and the maximum height difference of these tips is less than 10 nm. The indentation-induced selective etching provides a new strategy to fabricate well site-controlled tip arrays for multi-probe SPM system, Si nanostructure-based sensors and high-quality information storage.

  9. Chemical tailoring of teicoplanin with site-selective reactions.

    Science.gov (United States)

    Pathak, Tejas P; Miller, Scott J

    2013-06-05

    Semisynthesis of natural product derivatives combines the power of fermentation with orthogonal chemical reactions. Yet, chemical modification of complex structures represents an unmet challenge, as poor selectivity often undermines efficiency. The complex antibiotic teicoplanin eradicates bacterial infections. However, as resistance emerges, the demand for improved analogues grows. We have discovered chemical reactions that achieve site-selective alteration of teicoplanin. Utilizing peptide-based additives that alter reaction selectivities, certain bromo-teicoplanins are accessible. These new compounds are also scaffolds for selective cross-coupling reactions, enabling further molecular diversification. These studies enable two-step access to glycopeptide analogues not available through either biosynthesis or rapid total chemical synthesis alone. The new compounds exhibit a spectrum of activities, revealing that selective chemical alteration of teicoplanin may lead to analogues with attenuated or enhanced antibacterial properties, in particular against vancomycin- and teicoplanin-resistant strains.

  10. SKI SITE-94, deep repository performance assessment project, summary

    International Nuclear Information System (INIS)

    1999-01-01

    SITE-94 is a comprehensive performance assessment exercise for a hypothetical repository for spent nuclear fuel at a real site in Sweden. SITE-94 was carried out to develop the capability and tools to enable Swedish Nuclear Power Inspectorate (SKI) to review fully the proposals for a deep repository which are expected to be made by the Swedish Nuclear Fuel and Waste Management Company, SKB (the implementor). Sweden is one of the leading countries in the research and development of geological disposal of radioactive waste. The developed methodology for performance assessment has attracted interests from other countries. The Summary of the main report of the SITE-94 project is translated here into Japanese to allow to make the information on the methodology and the related issues available among Japanese concerned. (author)

  11. Applying a Hybrid MCDM Model for Six Sigma Project Selection

    Directory of Open Access Journals (Sweden)

    Fu-Kwun Wang

    2014-01-01

    Full Text Available Six Sigma is a project-driven methodology; the projects that provide the maximum financial benefits and other impacts to the organization must be prioritized. Project selection (PS is a type of multiple criteria decision making (MCDM problem. In this study, we present a hybrid MCDM model combining the decision-making trial and evaluation laboratory (DEMATEL technique, analytic network process (ANP, and the VIKOR method to evaluate and improve Six Sigma projects for reducing performance gaps in each criterion and dimension. We consider the film printing industry of Taiwan as an empirical case. The results show that our study not only can use the best project selection, but can also be used to analyze the gaps between existing performance values and aspiration levels for improving the gaps in each dimension and criterion based on the influential network relation map.

  12. Riel Converter Station, Winnipeg: Site selection and environmental assessment status report

    International Nuclear Information System (INIS)

    1991-01-01

    As part of its expansion plans, Manitoba Hydro is planning to construct a converter station east of Winnipeg to receive power from a 850-km dc transmission line which will be constructed to bring power from a new generating station in the north of the province. Work performed to date on site selection and preliminary environmental assessment of the converter station is reviewed. The role of the converter station is described and the potential impacts are summarized in such areas as employment opportunities, pollution and noise during construction, electric and magnetic field effects, and land use impacts. Site selection criteria are outlined and potential sites are identified and evaluated. The Deacon site has been chosen as the preferred site since it has a number of inherent advantages including existing ownership by Manitoba Hydro, proximity to existing transmission rights-of-way, and low visual and land-use impact. 12 figs

  13. Automating an integrated spatial data-mining model for landfill site selection

    Science.gov (United States)

    Abujayyab, Sohaib K. M.; Ahamad, Mohd Sanusi S.; Yahya, Ahmad Shukri; Ahmad, Siti Zubaidah; Aziz, Hamidi Abdul

    2017-10-01

    An integrated programming environment represents a robust approach to building a valid model for landfill site selection. One of the main challenges in the integrated model is the complicated processing and modelling due to the programming stages and several limitations. An automation process helps avoid the limitations and improve the interoperability between integrated programming environments. This work targets the automation of a spatial data-mining model for landfill site selection by integrating between spatial programming environment (Python-ArcGIS) and non-spatial environment (MATLAB). The model was constructed using neural networks and is divided into nine stages distributed between Matlab and Python-ArcGIS. A case study was taken from the north part of Peninsular Malaysia. 22 criteria were selected to utilise as input data and to build the training and testing datasets. The outcomes show a high-performance accuracy percentage of 98.2% in the testing dataset using 10-fold cross validation. The automated spatial data mining model provides a solid platform for decision makers to performing landfill site selection and planning operations on a regional scale.

  14. Stratigraphic Profiles for Selected Hanford Site Seismometer Stations and Other Locations

    Energy Technology Data Exchange (ETDEWEB)

    Last, George V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-02-01

    Stratigraphic profiles were constructed for eight selected Hanford Site seismometer stations, five Hanford Site facility reference locations, and seven regional three-component broadband seismometer stations. These profiles provide interpretations of the subsurface layers to support estimation of ground motions from past earthquakes, and the prediction of ground motions from future earthquakes. In most cases these profiles terminated at the top of the Wanapum Basalt, but at selected sites profiles were extended down to the top of the crystalline basement. The composite one-dimensional stratigraphic profiles were based primarily on previous interpretations from nearby boreholes, and in many cases the nearest deep borehole is located kilometers away.

  15. Equilibrium Strategy Based Recycling Facility Site Selection towards Mitigating Coal Gangue Contamination

    Directory of Open Access Journals (Sweden)

    Jiuping Xu

    2017-02-01

    Full Text Available Environmental pollution caused by coal gangue has been a significant challenge for sustainable development; thus, many coal gangue reduction approaches have been proposed in recent years. In particular, coal gangue facility (CGF construction has been considered as an efficient method for the control and recycling of coal gangue. Meanwhile, the identification and selection of suitable CGF sites is a fundamental task for the government. Therefore, based on the equilibrium strategy, a site selection approach under a fuzzy environment is developed to mitigate coal gangue contamination, which integrates a geographical information system (GIS technique and a bi-level model to identify candidate CGF sites and to select the most suitable one. In this situation, the GIS technique used to identify potential feasible sites is able to integrate a great deal of geographical data tofitwithpracticalcircumstances;thebi-levelmodelusedtoscreentheappropriatesitecanreasonably dealwiththeconflictsbetweenthelocalauthorityandthecolliery. Moreover,aKarush–Kuhn–Tucker (KKT condition-based approach is used to find an optimal solution, and a case study is given to demonstrate the effectiveness of the proposed method. The results across different scenarios show that appropriate site selection can achieve coal gangue reduction targets and that a suitable excess stack level can realize an environmental-economic equilibrium. Finally, some propositions and management recommendations are given.

  16. HOSPITAL SITE SELECTION USING TWO-STAGE FUZZY MULTI-CRITERIA DECISION MAKING PROCESS

    Directory of Open Access Journals (Sweden)

    Ali Soltani

    2011-06-01

    Full Text Available Site selection for sitting of urban activities/facilities is one of the crucial policy-related decisions taken by urban planners and policy makers. The process of site selection is inherently complicated. A careless site imposes exorbitant costs on city budget and damages the environment inevitably. Nowadays, multi-attributes decision making approaches are suggested to use to improve precision of decision making and reduce surplus side effects. Two well-known techniques, analytical hierarchal process and analytical network process are among multi-criteria decision making systems which can easily be consistent with both quantitative and qualitative criteria. These are also developed to be fuzzy analytical hierarchal process and fuzzy analytical network process systems which are capable of accommodating inherent uncertainty and vagueness in multi-criteria decision-making. This paper reports the process and results of a hospital site selection within the Region 5 of Shiraz metropolitan area, Iran using integrated fuzzy analytical network process systems with Geographic Information System (GIS. The weights of the alternatives were calculated using fuzzy analytical network process. Then a sensitivity analysis was conducted to measure the elasticity of a decision in regards to different criteria. This study contributes to planning practice by suggesting a more comprehensive decision making tool for site selection.

  17. HOSPITAL SITE SELECTION USING TWO-STAGE FUZZY MULTI-CRITERIA DECISION MAKING PROCESS

    Directory of Open Access Journals (Sweden)

    Ali Soltani

    2011-01-01

    Full Text Available Site selection for sitting of urban activities/facilities is one of the crucial policy-related decisions taken by urban planners and policy makers. The process of site selection is inherently complicated. A careless site imposes exorbitant costs on city budget and damages the environment inevitably. Nowadays, multi-attributes decision making approaches are suggested to use to improve precision of decision making and reduce surplus side effects. Two well-known techniques, analytical hierarchal process and analytical network process are among multi-criteria decision making systems which can easily be consistent with both quantitative and qualitative criteria. These are also developed to be fuzzy analytical hierarchal process and fuzzy analytical network process systems which are capable of accommodating inherent uncertainty and vagueness in multi-criteria decision-making. This paper reports the process and results of a hospital site selection within the Region 5 of Shiraz metropolitan area, Iran using integrated fuzzy analytical network process systems with Geographic Information System (GIS. The weights of the alternatives were calculated using fuzzy analytical network process. Then a sensitivity analysis was conducted to measure the elasticity of a decision in regards to different criteria. This study contributes to planning practice by suggesting a more comprehensive decision making tool for site selection.

  18. Resource evaluation and site selection for microalgae production systems

    Energy Technology Data Exchange (ETDEWEB)

    Maxwell, E.L.; Folger, A.G.; Hogg, S.E.

    1985-05-01

    Climate, land, and water resource requirements of microalgae production systems (MPS) were examined relative to construction costs, operating costs, and biomass productivity. The objective was the stratification of the southwestern United States into zones of relative suitability for MPS. Maps of climate (insolation, freeze-free period, precipitation, evaporation, thunderstorm days), land (use/cover, ownership, slope), and water (saline groundwater) resource parameters were obtained. These maps were transformed into digital overlays permitting the cell-by-cell compositing of selected resource parameters to form maps representing relative productivity, make-up water, climate suitability, land suitability, water suitability, and overall suitability. The Southwest was selected for this study because of its high levels of insolation, saline water resources, and large areas of relatively low valued land. The stratification maps cannot be used for the selection of specific sites because of their low resolution (12,455-acre cells). They can be used to guide future resource studies and site selection efforts, however, by limiting these efforts to the most suitable regions. Future efforts should concentrate on saline water resources, for which only limited data are currently available. 13 refs., 44 figs., 5 tabs.

  19. Critical management practices influencing on-site waste minimization in construction projects.

    Science.gov (United States)

    Ajayi, Saheed O; Oyedele, Lukumon O; Bilal, Muhammad; Akinade, Olugbenga O; Alaka, Hafiz A; Owolabi, Hakeem A

    2017-01-01

    As a result of increasing recognition of effective site management as the strategic approach for achieving the required performance in construction projects, this study seeks to identify the key site management practices that are requisite for construction waste minimization. A mixed methods approach, involving field study and survey research were used as means of data collection. After confirmation of construct validity and reliability of scale, data analysis was carried out through a combination of Kruskal-Wallis test, descriptive statistics and exploratory factor analysis. The study suggests that site management functions could significantly reduce waste generation through strict adherence to project drawings, and by ensuring fewer or no design changes during construction process. Provision of waste skips for specific materials and maximisation of on-site reuse of materials are also found to be among the key factors for engendering waste minimization. The result of factor analysis suggests four factors underlying on-site waste management practices with 96.093% of total variance. These measures include contractual provisions for waste minimization, waste segregation, maximisation of materials reuse and effective logistic management. Strategies through which each of the underlying measures could be achieved are further discussed in the paper. Findings of this study would assist construction site managers and other site operatives in reducing waste generated by construction activities. Copyright © 2016 Elsevier Ltd. All rights reserved.

  20. Study on the Selection of Equipment Suppliers for Wind Power Generation EPC Project

    Science.gov (United States)

    Yang, Yuanyue; Li, Huimin

    2017-12-01

    In the EPC project, the purchase cost of equipments accounted for about 60% of the total project cost, thus, the selection of equipment suppliers has an important influence on the EPC project. This paper, took EPC project for the phase I engineering of Guizhou Huaxi Yunding wind power plant as research background, constructed the evaluation index system for the selection of equipment suppliers for wind power generation EPC project from multiple perspectives, and introduced matter-element extension evaluation model to evaluate the selection of equipment suppliers for this project from the qualitative and quantitative point of view. The result is consistent with the actual situation, which verifies the validity and operability of this method.

  1. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    2000-01-01

    The Quality Assurance Project Plan (QAPjP) has been prepared for waste characterization activities to be conducted by the Transuranic (TRU) Project at the Hanford Site to meet requirements set forth in the Waste Isolation Pilot Plan (WIPP) Hazardous Waste Facility Permit, 4890139088-TSDF, Attachment B, including Attachments B1 through B6 (WAP) (DOE, 1999a). The QAPjP describes the waste characterization requirements and includes test methods, details of planned waste sampling and analysis, and a description of the waste characterization and verification process. In addition, the QAPjP includes a description of the quality assurance/quality control (QA/QC) requirements for the waste characterization program. Before TRU waste is shipped to the WIPP site by the TRU Project, all applicable requirements of the QAPjP shall be implemented. Additional requirements necessary for transportation to waste disposal at WIPP can be found in the ''Quality Assurance Program Document'' (DOE 1999b) and HNF-2600, ''Hanford Site Transuranic Waste Certification Plan.'' TRU mixed waste contains both TRU radioactive and hazardous components, as defined in the WLPP-WAP. The waste is designated and separately packaged as either contact-handled (CH) or remote-handled (RH), based on the radiological dose rate at the surface of the waste container. RH TRU wastes are not currently shipped to the WIPP facility

  2. Selecting downscaled climate projections for water resource impacts and adaptation

    Science.gov (United States)

    Vidal, Jean-Philippe; Hingray, Benoît

    2015-04-01

    Increasingly large ensembles of global and regional climate projections are being produced and delivered to the climate impact community. However, such an enormous amount of information can hardly been dealt with by some impact models due to computational constraints. Strategies for transparently selecting climate projections are therefore urgently needed for informing small-scale impact and adaptation studies and preventing potential pitfalls in interpreting ensemble results from impact models. This work proposes results from a selection approach implemented for an integrated water resource impact and adaptation study in the Durance river basin (Southern French Alps). A large ensemble of 3000 daily transient gridded climate projections was made available for this study. It was built from different runs of 4 ENSEMBLES Stream2 GCMs, statistically downscaled by 3 probabilistic methods based on the K-nearest neighbours resampling approach (Lafaysse et al., 2014). The selection approach considered here exemplifies one of the multiple possible approaches described in a framework for identifying tailored subsets of climate projections for impact and adaptation studies proposed by Vidal & Hingray (2014). It was chosen based on the specificities of both the study objectives and the characteristics of the projection dataset. This selection approach aims at propagating as far as possible the relative contributions of the four different sources of uncertainties considered, namely GCM structure, large-scale natural variability, structure of the downscaling method, and catchment-scale natural variability. Moreover, it took the form of a hierarchical structure to deal with the specific constraints of several types of impact models (hydrological models, irrigation demand models and reservoir management models). The implemented 3-layer selection approach is therefore mainly based on conditioned Latin Hypercube sampling (Christierson et al., 2012). The choice of conditioning

  3. Microclimate and nest-site selection in Micronesian Kingfishers

    Science.gov (United States)

    Kesler, Dylan C.; Haig, Susan M.

    2005-01-01

    We studied the relationship between microclimate and nest-site selection in the Pohnpei Micronesian Kingfisher (Todiramphus cinnamominus reichenbachii) which excavates nest cavities from the mudlike nest structures of arboreal termites (Nasutitermes sp.) or termitaria. Mean daily high temperatures at termitaria were cooler and daily low temperatures were warmer than at random sites in the forest. Results also indicate that termitaria provided insulation from temperature extremes, and that temperatures inside termitaria were within the thermoneutral zone of Micronesian Kingfishers more often than those outside. No differences were identified in temperatures at sites where nest termitaria and nonnest termitaria occurred or among the insulation properties of used and unused termitaria. These results suggest that although termitaria provide insulation from thermal extremes and a metabolically less stressful microclimate, king-fishers did not select from among available termitaria based on their thermal properties. Our findings are relevant to conservation efforts for the critically endangered Guam Micronesian Kingfisher (T. c. cinnamominus) which is extinct in the wild and exists only as a captive population. Captive breeding facilities should provide aviaries with daily ambient temperatures ranging from 22.06 A?C to 28.05 A?C to reduce microclimate-associated metabolic stress and to replicate microclimates used by wild Micronesian Kingfishers.

  4. Nuclear facility decommissioning and site remedial actions: A selected bibliography, volume 9

    International Nuclear Information System (INIS)

    Owen, P.T.; Knox, N.P.; Michelson, D.C.; Turmer, G.S.

    1988-09-01

    The 604 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the ninth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's remedial action programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Subsections for sections 1, 2, 5, and 6 include: Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at (615) 576-0568 or FTS 626-0568

  5. Proposed Project Selection Method for Human Support Research and Technology Development (HSR&TD)

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of HSR&TD is to deliver human support technologies to the Exploration Systems Mission Directorate (ESMD) that will be selected for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are acceptable. HSR&TD must select an may of technology development projects, guide them, and either terminate or continue them, so as to maximize the resulting number of usable advanced human support technologies. This paper proposes an effective project scoring methodology to support managing the HSR&TD project portfolio. Researchers strongly disagree as to what are the best technology project selection methods, or even if there are any proven ones. Technology development is risky and outstanding achievements are rare and unpredictable. There is no simple formula for success. Organizations that are satisfied with their project selection approach typically use a mix of financial, strategic, and scoring methods in an open, established, explicit, formal process. This approach helps to build consensus and develop management insight. It encourages better project proposals by clarifying the desired project attributes. We propose a project scoring technique based on a method previously used in a federal laboratory and supported by recent research. Projects are ranked by their perceived relevance, risk, and return - a new 3 R's. Relevance is the degree to which the project objective supports the HSR&TD goal of developing usable advanced human support technologies. Risk is the estimated probability that the project will achieve its specific objective. Return is the reduction in mission life cycle cost obtained if the project is successful. If the project objective technology performs a new function with no current cost, its return is the estimated cash value of performing the new function. The proposed project selection scoring method includes definitions of the criteria, a project evaluation

  6. The genealogy of sequences containing multiple sites subject to strong selection in a subdivided population.

    Science.gov (United States)

    Nordborg, Magnus; Innan, Hideki

    2003-03-01

    A stochastic model for the genealogy of a sample of recombining sequences containing one or more sites subject to selection in a subdivided population is described. Selection is incorporated by dividing the population into allelic classes and then conditioning on the past sizes of these classes. The past allele frequencies at the selected sites are thus treated as parameters rather than as random variables. The purpose of the model is not to investigate the dynamics of selection, but to investigate effects of linkage to the selected sites on the genealogy of the surrounding chromosomal region. This approach is useful for modeling strong selection, when it is natural to parameterize the past allele frequencies at the selected sites. Several models of strong balancing selection are used as examples, and the effects on the pattern of neutral polymorphism in the chromosomal region are discussed. We focus in particular on the statistical power to detect balancing selection when it is present.

  7. Sexual health promotion on social networking sites: a process evaluation of The FaceSpace Project.

    Science.gov (United States)

    Nguyen, Phuong; Gold, Judy; Pedrana, Alisa; Chang, Shanton; Howard, Steve; Ilic, Olivia; Hellard, Margaret; Stoove, Mark

    2013-07-01

    This article reports findings from an evaluation of reach and engagement of The FaceSpace Project, a novel sexual health promotion project delivered through social networking sites that targeted young people aged 16-29 years. Multiple methods were used to evaluate project reach and engagement. The evaluation focussed on quantitative data (online usage statistics, online surveys), complemented by available qualitative data (project team meeting notes). The project reached 900 fans who were mostly between 18 and 34 years of age. The most successful ways of increasing audience reach were via Facebook advertisements and tagging photos of young people attending a music festival on the project Facebook page. Peaks in Facebook page interactions (comments and "likes") coincided with recruitment peaks and when videos were posted. However, video views varied greatly between postings. Feedback from the project team for increasing engagement in future social networking site interventions included having one centralized Facebook page and using episodic videos. This evaluation is among the first to assess the use of social networking sites for sexual health promotion and provides information to inform the implementation and evaluation of future projects using new media. Social networking sites offer great potential to reach and engage young people for sexual health promotion. However, further work is required to improve implementation and promote audience reach and engagement as well as to determine effectiveness of social networking sites in changing knowledge, attitudes, and behaviors. Copyright © 2013 Society for Adolescent Health and Medicine. Published by Elsevier Inc. All rights reserved.

  8. SKI SITE-94. Deep Repository Performance Assessment Project Volume I and II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    The function of SITE-94 is to provide the Swedish Nuclear Power Inspectorate (SKI) with the capacity and supporting knowledge needed for reviewing the Swedish nuclear industry`s R and D programs and for reviewing license applications, as stipulated in Swedish legislation. The report is structured as a Performance Assessment exercise needed for input to decisions regarding repository safety, but the SITE-94 is not a safety assessment or a model for future assessments to be undertaken by the prospective licensee. The specific project objectives of SITE-94 comprise site evaluation, performance assessment methodology, canister integrity and radionuclide release and transport calculations. The report gives a detailed description of the many inter-related studies undertaken as part of the research project. As a general conclusion it is noted that the SITE-94 project has significantly advanced SKI`s capability of reviewing performance assessments and has led to the development of a tool-kit for carrying out assessment calculations, both in terms of numerical and scoping analyses. The study has highlighted a number of key issues for safety assessment (and consequently for disposal system design): Canister performance; Derived parameters of geosphere retention properties; Spatial variability of groundwater flow and geochemistry of migration paths; Time dependency (more emphasis on transient, time-dependent processes); Buffer evolution over long time. 488 refs.

  9. SKI SITE-94. Deep Repository Performance Assessment Project Volume I and II

    International Nuclear Information System (INIS)

    1996-12-01

    The function of SITE-94 is to provide the Swedish Nuclear Power Inspectorate (SKI) with the capacity and supporting knowledge needed for reviewing the Swedish nuclear industry's R and D programs and for reviewing license applications, as stipulated in Swedish legislation. The report is structured as a Performance Assessment exercise needed for input to decisions regarding repository safety, but the SITE-94 is not a safety assessment or a model for future assessments to be undertaken by the prospective licensee. The specific project objectives of SITE-94 comprise site evaluation, performance assessment methodology, canister integrity and radionuclide release and transport calculations. The report gives a detailed description of the many inter-related studies undertaken as part of the research project. As a general conclusion it is noted that the SITE-94 project has significantly advanced SKI's capability of reviewing performance assessments and has led to the development of a tool-kit for carrying out assessment calculations, both in terms of numerical and scoping analyses. The study has highlighted a number of key issues for safety assessment (and consequently for disposal system design): Canister performance; Derived parameters of geosphere retention properties; Spatial variability of groundwater flow and geochemistry of migration paths; Time dependency (more emphasis on transient, time-dependent processes); Buffer evolution over long time. 488 refs

  10. Valuation procedure for supra-regional siting of nuclear power plants

    International Nuclear Information System (INIS)

    Volwahsen, A.

    1977-01-01

    The entwinement of area planning and power policies is explained and conceivable effects of the selection of site for nuclear power stations on the regional economic and social structure as well as the housing development are discussed. A research project and its purposes are presented here, the project having been initiated in order to examine the siting concepts emerging from the discussion of deverging interests, and in order to elaborate a variety of concrete requirements to be made with regard to site examination and site selection. Large-scole valuation indicators and procedures are expected to lead to solutions acceptable for all parties concerned. (HP) 891 HP [de

  11. High-level radioactive waste repositories site selection plan

    International Nuclear Information System (INIS)

    Castanon, A.; Recreo, F.

    1985-01-01

    A general vision of the high level nuclear waste (HLNW) and/or nuclear spent fuel facilities site selection processes is given, according to the main international nuclear safety regulatory organisms quidelines and the experience from those countries which have reached a larger development of their national nuclear programs. (author)

  12. The Application of Computer-Aided Discovery to Spacecraft Site Selection

    Science.gov (United States)

    Pankratius, V.; Blair, D. M.; Gowanlock, M.; Herring, T.

    2015-12-01

    The selection of landing and exploration sites for interplanetary robotic or human missions is a complex task. Historically it has been labor-intensive, with large groups of scientists manually interpreting a planetary surface across a variety of datasets to identify potential sites based on science and engineering constraints. This search process can be lengthy, and excellent sites may get overlooked when the aggregate value of site selection criteria is non-obvious or non-intuitive. As planetary data collection leads to Big Data repositories and a growing set of selection criteria, scientists will face a combinatorial search space explosion that requires scalable, automated assistance. We are currently exploring more general computer-aided discovery techniques in the context of planetary surface deformation phenomena that can lend themselves to application in the landing site search problem. In particular, we are developing a general software framework that addresses key difficulties: characterizing a given phenomenon or site based on data gathered from multiple instruments (e.g. radar interferometry, gravity, thermal maps, or GPS time series), and examining a variety of possible workflows whose individual configurations are optimized to isolate different features. The framework allows algorithmic pipelines and hypothesized models to be perturbed or permuted automatically within well-defined bounds established by the scientist. For example, even simple choices for outlier and noise handling or data interpolation can drastically affect the detectability of certain features. These techniques aim to automate repetitive tasks that scientists routinely perform in exploratory analysis, and make them more efficient and scalable by executing them in parallel in the cloud. We also explore ways in which machine learning can be combined with human feedback to prune the search space and converge to desirable results. Acknowledgements: We acknowledge support from NASA AIST

  13. Lessons Learned from the On-Site Disposal Facility at Fernald Closure Project

    International Nuclear Information System (INIS)

    Kumthekar, U.A.; Chiou, J.D.

    2006-01-01

    The On-Site Disposal Facility (OSDF) at the U.S. Department of Energy's (DOE) Fernald Closure Project near Cincinnati, Ohio is an engineered above-grade waste disposal facility being constructed to permanently store low level radioactive waste (LLRW) and treated mixed LLRW generated during Decommissioning and Demolition (D and D) and soil remediation performed in order to achieve the final land use goal at the site. The OSDF is engineered to store 2.93 million cubic yards of waste derived from the remediation activities. The OSDF is intended to isolate its LLRW from the environment for at least 200 years and for up to 1,000 years to the extent practicable and achievable. Construction of the OSDF started in 1997 and waste placement activities will complete by the middle of April 2006 with the final cover (cap) placement over the last open cell by the end of Spring 2006. An on-site disposal alternative is considered critical to the success of many large-scale DOE remediation projects throughout the United States. However, for various reasons this cost effective alternative is not readily available in many cases. Over the last ten years Fluor Fernald Inc. has cumulated many valuable lessons learned through the complex engineering, construction, operation, and closure processes of the OSDF. Also in the last several years representatives from other DOE sites, State agencies, as well as foreign government agencies have visited the Fernald site to look for proven experiences and practices, which may be adapted for their sites. This paper present a summary of the major issues and lessons leaned at the Fernald site related to engineering, construction, operation, and closure processes for the disposal of remediation waste. The purpose of this paper is to share lessons learned and to benefit other projects considering or operating similar on-site disposal facilities from our successful experiences. (authors)

  14. The Finnish final disposal programme proceeds to the site selection

    International Nuclear Information System (INIS)

    Seppaelae, T.

    1999-01-01

    Research for the selection of the final disposal site has been carried out already since the beginning of 1980's. Field studies were started in 1987: In the recent years, studied sites have included Olkiluoto in Eurajoki, Haestholmen in Loviisa, Romuvaara in Kuhmo and Kivetty in Aeaenekoski. Based on 40 years operation of four power plant units, the estimate for the accumulation of spent fuel to be disposed of in Finland is 2,600 tU. A 'Decision in Principle' is needed from the Finnish government to select the final disposal site, Posiva submitted the application for a policy decision in May 1999. The intended site of the facility is Olkiluoto which produces most of the spent fuel in Finland: A disposal would minimise the need of transports. In a poll among the inhabitants of Eurajoki, 60 per cent approved the final disposal facility. After a positive decision of the government, Posiva will construct an underground research facility in Olkiluoto. The construction of the final disposal facility will take place in the 2010's, the facility should be operational in 2020. (orig.) [de

  15. The procedure of alternative site selection within the report of the study group on the radioactive waste final repository selection process (AKEnd)

    International Nuclear Information System (INIS)

    Brenner, M.

    2005-01-01

    The paper discusses the results of the report of the study group on the radioactive waste final repository selection process with respect to the alternative site selection procedure. Key points of the report are the long-term safety, the alternativity of sites and the concept of one repository. The critique on this report is focussed on the topics site selection and licensing procedures, civil participation, the factor time and the question of cost

  16. Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Irene Farnham

    2011-05-01

    This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.

  17. CanWEA regional issues and wind energy project siting : mountainous areas

    Energy Technology Data Exchange (ETDEWEB)

    D' Entremont, M. [Jacques Whitford Ltd., Vancouver, BC (Canada)]|[Axys Environmental Consulting Ltd., Vancouver, BC (Canada)

    2008-07-01

    Planning and permitting considerations for wind energy project siting in mountainous areas were discussed. Mountainous regions have a specific set of environmental and socio-economic concerns. Potential disruptions to wildlife, noise, and visual impacts are a primary concern in the assessment of potential wind farm projects. Alpine habitats are unique and often contain fragile and endangered species. Reclamation techniques for mountainous habitats have not been extensively tested, and the sites are not as resilient as sites located in other ecosystems. In addition, alpine habitats are often migratory corridors and breeding grounds for threatened or endangered birds. In the winter months, alpine habitats are used by caribou, grizzly bears, and wolverine dens. Bats are also present at high elevations. It is often difficult to conduct baseline and monitoring studies in mountainous areas since alpine habitat is subject to rapid weather changes, and has a very short construction period. tabs., figs.

  18. Development of site selection process for an LILW repository in Slovenia

    International Nuclear Information System (INIS)

    Zeleznik, N.; Kralj, M.; Mele, I.; Veselic, M.

    2005-01-01

    The activities regarding the LILW repository site selection in Slovenia are planned to meet the requirements of the Act on Ionising Radiation Protection and Nuclear Safety, especially the requirement that the site for a repository should be selected by 2008 and the repository should be in operation by 2013. In November 2004, the official administrative procedure for the siting of the repository started with the first spatial public conference on spatial planning procedure. It was carried out by the Ministry of the Environment and Spatial Planning and ARAO. Immediately after the conference the Program for the preparation of the detailed plan of national importance for the LILW repository was accepted by the Ministry. At the beginning of December 2004, ARAO invited all Slovenian local communities to participate in the site selection process and volunteer a site or area in their local community for further investigation. At the beginning of April 2005 the first phase of the bidding process was concluded. ARAO received applications from eight local communities. A pre-feasibility study to define three of the most promising locations was conducted because only three locations are foreseen by the Program for the preparation of the detailed plan of national importance. Methodologies were prepared for assessment of different parameters of technical, financial, environmental and spatial suitability as well as public acceptability. Comparative, preferential and also exclusion criteria for the respective parameters were defined. The results of the cabinet and fieldwork research were compared and further assessed in order to obtain maximum three local communities with three potential sites in which the probability of siting the LILW repository seems to be the highest. Detailed plans of national importance will be prepared for these sites. (author)

  19. The procedure of alternative site selection within the report of the study group on the radioactive waste final repository selection process (AKEnd)

    International Nuclear Information System (INIS)

    Nies, A.

    2005-01-01

    The study group on the selection procedures of radioactive waste final repository sites has presented the report in December 2002. The author dicusses the consequences of this report with respect to the site selection focussing on two topics: the serach for the best possible site and the prevention of prejudices

  20. The project on site - setting the scene for successful industrial relations

    International Nuclear Information System (INIS)

    Morris, D.; Kershaw, A.R.

    1989-01-01

    The site construction performance at Torness and Heysham 2 has been described in various other papers during the Conference and in common with other large projects undertaken over the last 20 years a final judgement will be made as to whether, in simple terms, they were ''good'' or ''bad'' sites. Although there are many individuals or organisations who may make this judgement, it is unlikely that the basic conclusion will differ. What may differ however is the list of reasons that will be advanced to explain the final result. Looking at the investigations made into past projects, the reasons advanced for their success or otherwise can range from the geographical location of the site to material delivery problems, design changes, safety issues, or even the state of the overall national economic climate during the period under scrutiny. Where industrial relations problems are singled out, they can usually be linked to one or more of the factors mentioned. When looking at the complexity of projects such as Torness and Heysham, it is to be expected that unlooked for difficulties and problems will always arise but it is equally true that there is sufficient experience and expertise available in the industry for many possible problem areas to be anticipated and ''designed'' out before work even commences on site. This paper will be looking at the clients' role in creating a suitable environment for contractors to fully manage all aspects of their site operation and to ensure that acute problems can receive the full attention of all parties and not have to be set against a continuing background of unnecessary irritations. (author)

  1. Strategic project selection based on evidential reasoning approach for high-end equipment manufacturing industry

    Directory of Open Access Journals (Sweden)

    Lu Guangyan

    2017-01-01

    Full Text Available With the rapid development of science and technology, emerging information technologies have significantly changed the daily life of people. In such context, strategic project selection for high-end equipment manufacturing industries faces more and more complexities and uncertainties with the consideration of several complex criteria. For example, a group of experts rather than a single expert should be invited to select strategic project for high-end equipment manufacturing industries and the experts may feel difficulty to express their preferences towards different strategic projects due to their limited cognitive capabilities. In order to handle these complexities and uncertainties, the criteria framework of strategic project selection is firstly constructed based on the characteristics of high-end equipment manufacturing industries and then evidential reasoning (ER approach is introduced in this paper to help experts express their uncertain preferences and aggregate these preferences to generate an appropriate strategic project. A real case of strategic project selection in a high-speed train manufacturing enterprise is investigated to demonstrate the validity of the ER approach in solving strategic project selection problem.

  2. Assessment parameters for coal-fired generation plant site selection

    OpenAIRE

    Abbas, Ahmad Rosly; Low, K. S.; Ahmad, Ir. Mohd Noh; Chan, J. H.; Sasekumar, A.; Abdul Ghaffar, Fauza; Osman Salleh, Khairulmaini; Raj, John K.; Abdul Yamin, Saad; Wan Aida, Wan Zahari; Phua, Y. T.; Phua, Y. N.; Wong, Y. Y.; Jamaludin, Ir. Mashitah; Jaafar, Shaari

    2005-01-01

    In order to meet future demand for electricity, Tenaga Nasional Berhad (TNB) is committedto the long-term strategic planning in locating suitable sites for future development of power stations.Site selection is an important process in the early planning stage of any power plant development asit will have significant implications on the capital investment, operational as well as the environmentand socio-economic costs of the power plant.The aim of this presentation is to briefly describe the t...

  3. The Cigeo project: an industrial storage site for radioactive wastes in deep underground

    International Nuclear Information System (INIS)

    Krieguer, Jean-Marie

    2017-01-01

    In 2006, France has decided to store its high-level and long-lived radioactive wastes, mostly issued from the nuclear industry, in a deep geological underground disposal site. This document presents the Cigeo project, a deep underground disposal site (located in the East of France) for such radioactive wastes, which construction is to be started in 2021 (subject to authorization in 2018). After a brief historical review of the project, started 20 years ago, the document presents the radioactive waste disposal context, the ethical choice of underground storage (in France and elsewhere) for these types of radioactive wastes, the disposal site safety and financing aspects, the progressive development of the underground facilities and, of most importance, its reversibility. In a second part, the various works around the site are presented (transport, buildings, water and power supply, etc.) together with a description of the various radioactive wastes (high and intermediate level and long-lived wastes and their packaging) that will be disposed in the site. The different steps of the project are then reviewed (the initial design and initial construction phases, the pilot industrial phase (expected in 2030), the operating phase, and the ultimate phases that will consist in the definitive closure of the site and its monitoring), followed by an extensive description of the various installations of surface and underground facilities, their architecture and their equipment

  4. Selecting Suitable Sites for Wind Energy Development in Ghana ...

    African Journals Online (AJOL)

    Selecting Suitable Sites for Wind Energy Development in Ghana. ... In the event of shortages in petroleum products, these power plants will have ... Layers of these criteria setting were combined using the overlay function in a GIS environment.

  5. Selection of executors for realization of individual tasks of the project

    Directory of Open Access Journals (Sweden)

    Asanov Askhat

    2017-01-01

    Full Text Available This article deals with the task of selection of executors for the realization of individual tasks of a new project. A short review of approaches to the estimation of personnel based on intellectual methods is provided. Two approaches to the task solution of executors’ selection are reviewed. The first approach allows considering estimation of competence of potential executors and data about projects that have already been realized. These data and requirements to the tasks of new projects are presented with the help of cognitive map with correspondent vertices. In the article, a methodologic example of the suggested approach use is introduced. The second approach suggests the use of Hopfield’s neural network. Neural networks allow using the already available experience of project activities during realization of new projects.

  6. Stability of choice in the honey bee nest-site selection process.

    Science.gov (United States)

    Nevai, Andrew L; Passino, Kevin M; Srinivasan, Parthasarathy

    2010-03-07

    We introduce a pair of compartment models for the honey bee nest-site selection process that lend themselves to analytic methods. The first model represents a swarm of bees deciding whether a site is viable, and the second characterizes its ability to select between two viable sites. We find that the one-site assessment process has two equilibrium states: a disinterested equilibrium (DE) in which the bees show no interest in the site and an interested equilibrium (IE) in which bees show interest. In analogy with epidemic models, we define basic and absolute recruitment numbers (R(0) and B(0)) as measures of the swarm's sensitivity to dancing by a single bee. If R(0) is less than one then the DE is locally stable, and if B(0) is less than one then it is globally stable. If R(0) is greater than one then the DE is unstable and the IE is stable under realistic conditions. In addition, there exists a critical site quality threshold Q(*) above which the site can attract some interest (at equilibrium) and below which it cannot. We also find the existence of a second critical site quality threshold Q(**) above which the site can attract a quorum (at equilibrium) and below which it cannot. The two-site discrimination process, in which we examine a swarm's ability to simultaneously consider two sites differing in both site quality and discovery time, has a stable DE if and only if both sites' individual basic recruitment numbers are less than one. Numerical experiments are performed to study the influences of site quality on quorum time and the outcome of competition between a lower quality site discovered first and a higher quality site discovered second. 2009 Elsevier Ltd. All rights reserved.

  7. The importance of site selection for setting up a wind turbine

    Energy Technology Data Exchange (ETDEWEB)

    Raghunandan, A.; Gowda, G.; Pandian, A. [MS RAMAIAH Institute of Technology, Bangalore (India); Ramanan, G. [RV College of Engineering, Bangalore (India)

    2012-07-01

    A wind energy system transforms the kinetic energy of the wind into mechanical or electrical energy that can be harnessed for practical use. Building a wind turbine is far more than simply a matter of finding a field or mountaintop where the wind is blowing and plopping one down. A great deal of attention should be given to finding the proper site for a wind turbine. The main factor one should consider is the average speed of the wind over an extended time. Estimation of the wind power potential for a site is the most important requirement for selecting a site for the installation of a wind turbine. Also wind turbines should be sited well above trees, buildings, and other obstacles else, the result will be poor energy production and increased wear and tear on the turbine. One way to get rid of this is to place the wind turbine on a tall tower. When selecting a place for setting up a wind turbine, engineers consider factors such as wind hazards, characteristics of the land that affect wind speed, and the effects of one turbine on nearby turbines in wind farms. The other factors that are important for selecting a site for installation of wind turbines are Hill effect, Roughness, or the amount of friction that Earth's surface exerts on wind, Tunnel effect, Turbulence, Variations in wind speed, Wind obstacles and Wind shear. This paper will emphasis on the necessary inspections which are to be done on the site before installing a Wind Turbine. (Author)

  8. A Multiagent Evolutionary Algorithm for the Resource-Constrained Project Portfolio Selection and Scheduling Problem

    Directory of Open Access Journals (Sweden)

    Yongyi Shou

    2014-01-01

    Full Text Available A multiagent evolutionary algorithm is proposed to solve the resource-constrained project portfolio selection and scheduling problem. The proposed algorithm has a dual level structure. In the upper level a set of agents make decisions to select appropriate project portfolios. Each agent selects its project portfolio independently. The neighborhood competition operator and self-learning operator are designed to improve the agent’s energy, that is, the portfolio profit. In the lower level the selected projects are scheduled simultaneously and completion times are computed to estimate the expected portfolio profit. A priority rule-based heuristic is used by each agent to solve the multiproject scheduling problem. A set of instances were generated systematically from the widely used Patterson set. Computational experiments confirmed that the proposed evolutionary algorithm is effective for the resource-constrained project portfolio selection and scheduling problem.

  9. Latest development in project site radwaste treatment facility (SRTF) Sanmen

    International Nuclear Information System (INIS)

    Mennicken, K.; Lohmann, P.

    2015-01-01

    Westinghouse Electric Germany GmbH (WEG) was successful in being awarded a contract as to the planning, delivery, installation and commissioning of radwaste treatment systems for the AP1000 units at Sanmen site, PR China. Operational low and intermediate level radioactive waste will be processed in the Site Radwaste Treatment Facility (SRTF). This paper explains the latest developments of the project, especially the experience with customer-hired Chinese planning partners, installation companies and Customer operating personnel. (authors)

  10. National Ignition Facility subsystem design requirements NIF site improvements SSDR 1.2.1

    International Nuclear Information System (INIS)

    Kempel, P.; Hands, J.

    1996-01-01

    This Subsystem Design Requirements (SSDR) document establishes the performance, design, and verification requirements associated with the NIF Project Site at Lawrence Livermore National Laboratory (LLNL) at Livermore, California. It identifies generic design conditions for all NIF Project facilities, including siting requirements associated with natural phenomena, and contains specific requirements for furnishing site-related infrastructure utilities and services to the NIF Project conventional facilities and experimental hardware systems. Three candidate sites were identified as potential locations for the NIF Project. However, LLNL has been identified by DOE as the preferred site because of closely related laser experimentation underway at LLNL, the ability to use existing interrelated infrastructure, and other reasons. Selection of a site other than LLNL will entail the acquisition of site improvements and infrastructure additional to those described in this document. This SSDR addresses only the improvements associated with the NIF Project site located at LLNL, including new work and relocation or demolition of existing facilities that interfere with the construction of new facilities. If the Record of Decision for the PEIS on Stockpile Stewardship and Management were to select another site, this SSDR would be revised to reflect the characteristics of the selected site. Other facilities and infrastructure needed to support operation of the NIF, such as those listed below, are existing and available at the LLNL site, and are not included in this SSDR. Office Building. Target Receiving and Inspection. General Assembly Building. Electro- Mechanical Shop. Warehousing and General Storage. Shipping and Receiving. General Stores. Medical Facilities. Cafeteria services. Service Station and Garage. Fire Station. Security and Badging Services

  11. Hydrologic site characterization - the UMTRA project approach

    International Nuclear Information System (INIS)

    Binkman, J.E.; Hoopes, J.R.

    1985-01-01

    The United States Environmental Protection Agency (EPA) Standards (40 CFR 192) require site characterization of the hydrogeologic regime at and around each Uranium Mill Tailings Remedial Action (UMTRA) Project site. Also, ''judgements on the possible need for remedial or protective actions for groundwater aquifers should be guided by relevant considerations described in EPA's hazardous waste management system (47 CFR 32274).'' To address those two sets of rules and regulations, a generic approach is being developed. Fourteen primary issues were determined. These issues can be grouped into those that can be determined by documentation of available information and present conditions, those that require extensive field investigations and those that require some form of predictive modeling. To address the various issues requires an integrated effort of hydrogeologists, environmental engineers or scientists and health physicists. In this paper, the approach to the resolution of these fourteen issues is described briefly

  12. GENISES: A GIS Database for the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Beckett, J.

    1991-01-01

    This paper provides a general description of the Geographic Nodal Information Study and Evaluation System (GENISES) database design. The GENISES database is the Geographic Information System (GIS) component of the Yucca Mountain Site Characterization Project Technical Database (TDB). The GENISES database has been developed and is maintained by EG ampersand G Energy Measurements, Inc., Las Vegas, NV (EG ampersand G/EM). As part of the Yucca Mountain Project (YMP) Site Characterization Technical Data Management System, GENISES provides a repository for geographically oriented technical data. The primary objective of the GENISES database is to support the Yucca Mountain Site Characterization Project with an effective tool for describing, analyzing, and archiving geo-referenced data. The database design provides the maximum efficiency in input/output, data analysis, data management and information display. This paper provides the systematic approach or plan for the GENISES database design and operation. The paper also discusses the techniques used for data normalization or the decomposition of complex data structures as they apply to GIS database. ARC/INFO and INGRES files are linked or joined by establishing ''relate'' fields through the common attribute names. Thus, through these keys, ARC can allow access to normalized INGRES files greatly reducing redundancy and the size of the database

  13. Iterative performance assessments as a regulatory tool for evaluating repository safety: How experiences from SKI Project-90 were used in formulating the new performance assessment project SITE-94

    International Nuclear Information System (INIS)

    Andersson, J.

    1993-01-01

    The Swedish Nuclear Power Inspectorate, SKI, regulatory research program has to prepare for the process of licensing a repository for spent nuclear fuel, by building up the necessary knowledge and review capacity. SKIs main strategy for meeting this demand is to develop an independent performance assessment capability. SKIs first own performance assessment project, Project-90, was completed in 1991 and is now followed by a new project, SITE-94. SITE-94 is based on conclusions reached within Project-90. An independent review of Project-90, carried out by a NEA team of experts, has also contributed to the formation of the project. Another important reason for the project is that the implementing organization in Sweden, SKB, has proposed to submit an application to start detailed investigation of a repository candidate site around 1997. SITE-94 is a performance assessment of a hypothetical repository at a real site. The main objective of the project is to determine how site specific data should be assimilated into the performance assessment process, and to evaluate how uncertainties inherent in site characterization will influence performance assessment results. This will be addressed by exploring multiple interpretations, conceptual models, and parameters consistent with the site data. The site evaluation will strive for consistency between geological, hydrological, rock mechanical, and geochemical descriptions. Other important elements of SITE-94 are the development of a practical and defensible methodology for defining, constructing and analyzing scenarios, the development of approaches for treatment of uncertainties, evaluation of canister integrity, and the development and application of an appropriate quality assurance plan for performance assessments

  14. Project licensing plan for UMTRA [Uranium Mill Tailings Remedial Action] sites

    International Nuclear Information System (INIS)

    1984-07-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Licensing Plan is to establish how a disposal site will be licensed, and to provide responsibilities of participatory agencies as legislated by the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (Public Law 95-604). This Plan has been developed to ensure that the objectives of licensing are met by identifying the necessary institutional controls, participatory agency responsibilities, and key milestones in the licensing process. The Plan contains the legislative basis for and a description of the licensing process (''Process'') for UMTRA sites. This is followed by a discussion of agency responsibilities, and milestones in the Process. The Plan concludes with a generic timeline of this Process. As discussed in Section 2.1, a custodial maintenance and surveillance plan will constitute the basis for a site license. The details of maintenance and surveillance are discussed in the Project Maintenance and Surveillance Plan (AL-350124.0000). 5 refs., 4 figs

  15. Exploring project selection behavior of academic scientists in India

    OpenAIRE

    Anju Chawla

    2007-01-01

    This study is based on retrospective accounts of a stratified sample of about 1,100 academic scien-tists in India on the criteria actually used by them in the choice of research projects. A basic objective is to examine the effects of contextual factors such as academic rank, institutional and disciplinary setting, and sources of research funds on the choice of research projects. A struc-tured questionnaire was used to tap the criteria for project selection. The items were factor-analyzed and...

  16. Policy and procedures for classification of Class III groundwater at UMTRA Project sites

    International Nuclear Information System (INIS)

    1989-03-01

    The US Environmental Protection Agency (EPA) has recently proposed groundwater regulations for the US Department of Energy's )DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. These regulations allow the application of supplemental standards at UMTRA Project sites in specific situations. The designation of groundwater as Class III permits the application of supplemental standards. This document discusses a final UMTRA Project policy and procedures for identifying Class III groundwater, including identification of a review area, definition of water quality, quantification of aquifer yield, and identification of methods reasonably employed for public water supply systems. These items, either individually or collectively, need to be investigated in order to determine if groundwaters at UMTRA Project sites are Class III. This document provides a framework for the DOE to determine Class III groundwaters

  17. Transshipment site selection using the AHP and TOPSIS approaches under fuzzy environment

    International Nuclear Information System (INIS)

    Onuet, Semih; Soner, Selin

    2008-01-01

    Site selection is an important issue in waste management. Selection of the appropriate solid waste site requires consideration of multiple alternative solutions and evaluation criteria because of system complexity. Evaluation procedures involve several objectives, and it is often necessary to compromise among possibly conflicting tangible and intangible factors. For these reasons, multiple criteria decision-making (MCDM) has been found to be a useful approach to solve this kind of problem. Different MCDM models have been applied to solve this problem. But most of them are basically mathematical and ignore qualitative and often subjective considerations. It is easier for a decision-maker to describe a value for an alternative by using linguistic terms. In the fuzzy-based method, the rating of each alternative is described using linguistic terms, which can also be expressed as triangular fuzzy numbers. Furthermore, there have not been any studies focused on the site selection in waste management using both fuzzy TOPSIS (technique for order preference by similarity to ideal solution) and AHP (analytical hierarchy process) techniques. In this paper, a fuzzy TOPSIS based methodology is applied to solve the solid waste transshipment site selection problem in Istanbul, Turkey. The criteria weights are calculated by using the AHP

  18. Selection of Inhibitor-Resistant Viral Potassium Channels Identifies a Selectivity Filter Site that Affects Barium and Amantadine Block

    Science.gov (United States)

    Fujiwara, Yuichiro; Arrigoni, Cristina; Domigan, Courtney; Ferrara, Giuseppina; Pantoja, Carlos; Thiel, Gerhard; Moroni, Anna; Minor, Daniel L.

    2009-01-01

    Background Understanding the interactions between ion channels and blockers remains an important goal that has implications for delineating the basic mechanisms of ion channel function and for the discovery and development of ion channel directed drugs. Methodology/Principal Findings We used genetic selection methods to probe the interaction of two ion channel blockers, barium and amantadine, with the miniature viral potassium channel Kcv. Selection for Kcv mutants that were resistant to either blocker identified a mutant bearing multiple changes that was resistant to both. Implementation of a PCR shuffling and backcrossing procedure uncovered that the blocker resistance could be attributed to a single change, T63S, at a position that is likely to form the binding site for the inner ion in the selectivity filter (site 4). A combination of electrophysiological and biochemical assays revealed a distinct difference in the ability of the mutant channel to interact with the blockers. Studies of the analogous mutation in the mammalian inward rectifier Kir2.1 show that the T→S mutation affects barium block as well as the stability of the conductive state. Comparison of the effects of similar barium resistant mutations in Kcv and Kir2.1 shows that neighboring amino acids in the Kcv selectivity filter affect blocker binding. Conclusions/Significance The data support the idea that permeant ions have an integral role in stabilizing potassium channel structure, suggest that both barium and amantadine act at a similar site, and demonstrate how genetic selections can be used to map blocker binding sites and reveal mechanistic features. PMID:19834614

  19. Site selection and characterization processes for deep geologic disposal of high level nuclear waste

    International Nuclear Information System (INIS)

    Costin, L.S.

    1997-10-01

    In this paper, the major elements of the site selection and characterization processes used in the US high level waste program are discussed. While much of the evolution of the site selection and characterization processes have been driven by the unique nature of the US program, these processes, which are well defined and documented, could be used as an initial basis for developing site screening, selection, and characterization programs in other countries. Thus, this paper focuses more on the process elements than the specific details of the US program

  20. Behavioural changes experienced by contract managers while working on remote project sites

    OpenAIRE

    2012-01-01

    M.B.A. This research project is concerned with the behavioural changes of contract managers while working on 'remote' project sites. While working on such a project, the researcher became aware that the behaviour of certain contract managers changed over the course of the project, and that this behaviour was not the same as they demonstrated when at home or in the office environment. In many instances these behavioural changes were of a negative nature, the consequences of which often resu...

  1. Overview of ONWI'S Salt site selection program

    International Nuclear Information System (INIS)

    Madia, W.J.

    1983-01-01

    In the past year, activities in the salt site selection program of the Office of Nuclear Waste Isolation (ONWI) have focused on narrowing the number and size of areas under consideration as candidate repository sites. The progressive focusing is illustrated. Bedded salt, in the Permian Basin of West Texas and the Paradox Basin of Utah, and salt domes in the Gulf Coast Salt Dome Region (including parts of East Texas, Louisiana, and Mississippi) have been the subjects of geologic, environmental, and socioeconomic characterization of progressively greater detail as the screening process has proceeded. Detailed, field-oriented research and testing have superceded broad-based studies relying heavily on literature and other existing data. Coinciding with the increased field activities has been the publication of results and recommendations resulting from earlier program efforts

  2. Nuclear facility decommissioning and site remedial actions: A selected bibliography, volume 9

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Michelson, D.C.; Turmer, G.S.

    1988-09-01

    The 604 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the ninth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's remedial action programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Subsections for sections 1, 2, 5, and 6 include: Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at (615) 576-0568 or FTS 626-0568.

  3. Computational Experiment Study on Selection Mechanism of Project Delivery Method Based on Complex Factors

    Directory of Open Access Journals (Sweden)

    Xiang Ding

    2014-01-01

    Full Text Available Project delivery planning is a key stage used by the project owner (or project investor for organizing design, construction, and other operations in a construction project. The main task in this stage is to select an appropriate project delivery method. In order to analyze different factors affecting the PDM selection, this paper establishes a multiagent model mainly to show how project complexity, governance strength, and market environment affect the project owner’s decision on PDM. Experiment results show that project owner usually choose Design-Build method when the project is very complex within a certain range. Besides, this paper points out that Design-Build method will be the prior choice when the potential contractors develop quickly. This paper provides the owners with methods and suggestions in terms of showing how the factors affect PDM selection, and it may improve the project performance.

  4. Analysis of Multi-Criteria Evaluation Method of Landfill Site Selection for Municipal Solid Waste Management

    Science.gov (United States)

    Mohammed, Habiba Ibrahim; Majid, Zulkepli; Yusof, Norhakim Bin; Bello Yamusa, Yamusa

    2018-03-01

    Landfilling remains the most common systematic technique of solid waste disposal in most of the developed and developing countries. Finding a suitable site for landfill is a very challenging task. Landfill site selection process aims to provide suitable areas that will protect the environment and public health from pollution and hazards. Therefore, various factors such as environmental, physical, socio-economic, and geological criteria must be considered before siting any landfill. This makes the site selection process vigorous and tedious because it involves the processing of large amount of spatial data, rules and regulations from different agencies and also policy from decision makers. This allows the incorporation of conflicting objectives and decision maker preferences into spatial decision models. This paper particularly analyzes the multi-criteria evaluation (MCE) method of landfill site selection for solid waste management by means of literature reviews and surveys. The study will help the decision makers and waste management authorities to choose the most effective method when considering landfill site selection.

  5. Analysis of Multi-Criteria Evaluation Method of Landfill Site Selection for Municipal Solid Waste Management

    Directory of Open Access Journals (Sweden)

    Ibrahim Mohammed Habiba

    2018-01-01

    Full Text Available Landfilling remains the most common systematic technique of solid waste disposal in most of the developed and developing countries. Finding a suitable site for landfill is a very challenging task. Landfill site selection process aims to provide suitable areas that will protect the environment and public health from pollution and hazards. Therefore, various factors such as environmental, physical, socio-economic, and geological criteria must be considered before siting any landfill. This makes the site selection process vigorous and tedious because it involves the processing of large amount of spatial data, rules and regulations from different agencies and also policy from decision makers. This allows the incorporation of conflicting objectives and decision maker preferences into spatial decision models. This paper particularly analyzes the multi-criteria evaluation (MCE method of landfill site selection for solid waste management by means of literature reviews and surveys. The study will help the decision makers and waste management authorities to choose the most effective method when considering landfill site selection.

  6. Evaluation of an Improved Branch-Site Likelihood Method for Detecting Positive Selection at the Molecular Level

    DEFF Research Database (Denmark)

    Zhang, Jianzhi; Nielsen, Rasmus; Yang, Ziheng

    2005-01-01

    of interest, while test 2 had acceptable false-positive rates and appeared robust against violations of model assumptions. As test 2 is a direct test of positive selection on the lineages of interest, it is referred to as the branch-site test of positive selection and is recommended for use in real data......Detecting positive Darwinian selection at the DNA sequence level has been a subject of considerable interest. However, positive selection is difficult to detect because it often operates episodically on a few amino acid sites, and the signal may be masked by negative selection. Several methods have...... been developed to test positive selection that acts on given branches (branch methods) or on a subset of sites (site methods). Recently, Yang, Z., and R. Nielsen (2002. Codon-substitution models for detecting molecular adaptation at individual sites along specific lineages. Mol. Biol. Evol. 19...

  7. ENHANCING EFFECTIVENESS OF EMSP PROJECTS THROUGH STRONG CONNECTIONS TO SITE PROBLEMS

    International Nuclear Information System (INIS)

    Josephson, Gary B.; Hale, Donna

    2003-01-01

    The Environmental Management Science Program (EMSP) funds basic science research that will lead to reduced remediation cost, schedule, technical uncertainties, and risk for DOE's environmental clean up. The Tanks Focus Area (TFA) has partnered with EMSP to accomplish those same objectives for DOE's largest and most expensive remediation effort - to retrieve and immobilize the highly radioactive wastes that are our nation's chief nuclear defense program legacy. TFA has been tasked to facilitate success of the EMSP investment. The key for EMSP projects to contribute to this remediation effort is communication. First, the scientist needs to understand much more about how his scientific results would be used than he could ever learn from the original EMSP solicitation or by reading the referenced DOE needs statements. Second, the scientist's results must be communicated to the site problem holders in a usable form and in a timely manner such that important information gaps can still be filled by the EMSP project. Research results can be used in a variety of ways besides deployment of new hardware or a new process. When results are USED the site problem holders become 'users'. The important aspect that research results are to be used is captured in the TFA lexicon for their clients, the DOE sites--'USERS'. The best method observed, so far, to accomplish the indispensable communication necessary for success is through direct contact between EMSP researchers and TFA/site problem holders, person to person. The observation that direct contact is the best medium for exchange of complex information may seem inanely obvious. However, it is not the normal procedure in the more academic world of the fundamental scientists, where publishing of results in a peer-reviewed journal completes the transmittal of scientific results. Direct communication between EMSP researchers and site users doesn't occur naturally. TFA actively bridges this gap between science and technology

  8. Brownfields Technology Primer: Selecting and Using Phytoremediation for Site Cleanup

    Science.gov (United States)

    This primer explains the phytoremediation process, discusses the potential advantages and considerations in selecting phytoremediation to clean up brownfields sites, and provides information on additional resources about phytoremediation.

  9. Integral Public Activities as a Support to the Site Selection Process for LILW Repository

    International Nuclear Information System (INIS)

    Zeleznik, N.; Kralj, M.

    2008-01-01

    The first site selection process for low and intermediate level radioactive waste (LILW) repository took place between 1990 and 1993 in Slovenia was stopped unsuccessfully with very strong public opposition at local level, followed by political withdrawal on national level. As one of the consequences ARAO started to develop new approach to the site selection based also on the findings from sociology, psychology and other human sciences. The recommendations on public involvement and transparency were so strong that ARAO started with first limited public relation (PR) activities which later grew to the PR process which supports all technical activities in ARAO. Presently the PR process covers communication, information and research activities and assures careful planning, prompt responds and involvement of the highest responsible persons at ARAO. Integral public relation activities are divided in several parts. Majority of activities support the on-going site selection process where activities are presently focused on functioning of local partnerships developed as a basic communication tool to involve as much citizens and public as possible on local level. Presently two local partnerships are working in Krsko and Brezice community with clear role to enhance public involvement according to Aarchus convention. Each of the partnerships is organized in a specific way adjusted to the local needs. Communication activities are organized also for different other projects and are preparing the necessary basis for the work with different groups of stake holders and in different situations. As a foundation very broad information material, such as books, leaflets, reports, magazines, video cassettes, CD and DVD on the radioactive waste management is prepared and used for different purposes. We also try to be proactive with web pages and have a well organized visitors' center. Improvement of public relation process is achieved through constant survey and feed-back information

  10. Analysis of the portfolio of sites to characterize for selecting a nuclear repository

    International Nuclear Information System (INIS)

    Keeney, R.L.

    1987-01-01

    The US Department of Energy has selected three sites, from five nominated, to characterize for a nuclear repository to permanently dispose of nuclear waste. This decision was made without the benefit of an analysis of this portfolio problem. This paper analyzes different portfolios of three sites for simultaneous characterization and strategies for sequential characterization. Characterization of each site, which involves significant subsurface excavation, is now estimated to cost $1 billion. Mainly because of the high characterization costs, sequential characterization strategies are identified which are the equivalent of $1.7-2.0 billion less expensive than the selected DOE simultaneous characterization of the three sites. If three sites are simultaneously characterized, one portfolio is estimated to be the equivalent of $100-400 million better than the selected DOE portfolio. Because of these potential savings and several other complicating factors that may influence the relative desirability of characterization strategies, a thorough analysis of characterization strategies that addresses the likelihood of finding disqualifying conditions during site characterization, uncertainties, and dependencies in forecast site repository costs, preclosure and postclosure health and safety impacts, potential delays of both sequential and simultaneous characterization strategies, and the environmental, socioeconomic, and health and safety impacts of characterization activities is recommended

  11. Technical data base quarterly report, April--June 1992; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-09-01

    The acquisition and development of technical data are activities that provide the information base from which the Yucca mountain Site will be characterized and may P-ventually be licensed as a high-level waste repository. The Project Technical Data Base (TDB) is the repository for the regional and site-specific technical data required in intermediate and license application analyses and models. The TDB Quarterly Report provides the mechanism for identifying technical data currently available from the Project TDB. Due to the variety of scientific information generated by YMP activities, the Project TDB consists of three components, each designed to store specific types of data. The Site and Engineering Properties Data Base (SEPDB) maintains technical data best stored in a tabular format. The Geographic Nodal Information Study and Evaluation System (GENISES), which is the Geographic Information System (GIS) component of the Project TDB, maintains spatial or map-like data. The Geologic and Engineering Materials Bibliography of Chemical Species (GEMBOCHS) data base maintains thermodynamic/geochemical data needed to support geochemical reaction models involving the waste package and repository geochemical environment. Each of these data bases are addressed independently within the TDB Quarterly Report.

  12. Site selection of radioactive waste repository in the Republic of Croatia

    International Nuclear Information System (INIS)

    Saler, A.

    1992-01-01

    The radioactive waste repository site-selection procedure in Croatia is divided into two stages: the first, related to the exclusionary screening of the national territory and comparison of potential areas in order to identify preferred sites, acceptable for inclusion into the Regional Plan; and the second, comprising all necessary field investigations as well as additional site-characterization tasks planned to be worked out at a preferred sites. Several potential areas, representing an intermediate goal of the first stage, are defined till now. (author) [hr

  13. Experience in selection and characterization of sites for geological disposal of radioactive waste

    International Nuclear Information System (INIS)

    1997-12-01

    An important matter in the development of a geological repository for disposal radioactive waste is the selection of a site that has characteristics that are favorable for isolation. A number of Member States have had national programmes under way for several decades to investigate sites to gather the geological information needed to design and construct a safe repository. The purpose of this report is to document this experience and to summarize what has been learned about the site selection and investigation process. It is hoped it will be of interest to scientists and engineers working in national disposal programmes by providing them information and key references regarding the disposal programmes in other countries. It may also be of interest to members of the public and to decision makers wanting an overview of the worldwide status of programmes to select and characterize geological disposal sites for radioactive waste

  14. Ponnequin Wind Energy Project: Reference site avian study, January 1, 1998--December 31, 1998

    Energy Technology Data Exchange (ETDEWEB)

    Kerlinger, P.; Curry, R.; Ryder, R.

    2000-04-05

    This report summarizes the results of surveys completed during the period January 1, 1998, through December 31, 1998, at the Ponnequin Wind Energy Project in Weld County, Colorado. The surveys were conducted at two reference sites, and include a pre-construction avian abundance and use survey and raptor nesting, prey, and carcass surveys. The reference sites were situated immediately to the west of the project site in Weld County, Colorado, and 4.8 kilometers to the north of the site in Laramie County, Wyoming. The surveys were conducted along two 800-meter (m) main transects at each site with two 400-m (by 100-m) perpendicular transects. About 30 complete surveys were completed during the year, with a greater frequency of surveys in the late spring and early autumn. The surveys revealed mostly common species, with no endangered or threatened species on the sites. Small numbers of raptors were observed on or near the project and reference areas. During the winter, avian use and abundance was minimal. Prey species consisted primarily of thirteen-lined ground squirrels and northern pocket gophers. Two songbird carcasses were found. The results of these surveys, combined with data from several more months of surveys, will be compared to surveys conducted after construction of the wind farm.

  15. Ponnequin Wind Energy Project: Reference site avian study, January 1, 1998--December 31, 1998

    International Nuclear Information System (INIS)

    Kerlinger, P.; Curry, R.; Ryder, R.

    2000-01-01

    This report summarizes the results of surveys completed during the period January 1, 1998, through December 31, 1998, at the Ponnequin Wind Energy Project in Weld County, Colorado. The surveys were conducted at two reference sites, and include a pre-construction avian abundance and use survey and raptor nesting, prey, and carcass surveys. The reference sites were situated immediately to the west of the project site in Weld County, Colorado, and 4.8 kilometers to the north of the site in Laramie County, Wyoming. The surveys were conducted along two 800-meter (m) main transects at each site with two 400-m (by 100-m) perpendicular transects. About 30 complete surveys were completed during the year, with a greater frequency of surveys in the late spring and early autumn. The surveys revealed mostly common species, with no endangered or threatened species on the sites. Small numbers of raptors were observed on or near the project and reference areas. During the winter, avian use and abundance was minimal. Prey species consisted primarily of thirteen-lined ground squirrels and northern pocket gophers. Two songbird carcasses were found. The results of these surveys, combined with data from several more months of surveys, will be compared to surveys conducted after construction of the wind farm

  16. Yucca Mountain Site Characterization Project bibliography, July--December 1992: An update, Supplement 3, Addendum 2

    International Nuclear Information System (INIS)

    1993-04-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Energy Science and Technology Database from July 1, 1992, through December 31, 1992. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it

  17. Yucca Mountain Site Characterization Project bibliography, January--June 1995. Supplement 4, Add.3: An update

    Energy Technology Data Exchange (ETDEWEB)

    Stephan, P.M. [ed.

    1996-01-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy`s Energy Science and Technology Database from January 1, 1995, through June 30, 1995. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization`s list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it.

  18. Yucca Mountain Site Characterization Project Bibliography, January--June 1993. An update: Supplement 4, Addendum 1

    Energy Technology Data Exchange (ETDEWEB)

    Stephan, P.M. [ed.

    1995-01-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy`s Energy Science and Technology Database from January 1, 1994 through June 30, 1994. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers,and articles are included in the sponsoring organization`s list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it.

  19. Yucca Mountain Site Characterization Project Bibliography, January--June 1993. An update: Supplement 4, Addendum 1

    International Nuclear Information System (INIS)

    Stephan, P.M.

    1995-01-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Energy Science and Technology Database from January 1, 1994 through June 30, 1994. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers,and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it

  20. Yucca Mountain Site Characterization Project bibliography, January--June 1995. Supplement 4, Add.3: An update

    International Nuclear Information System (INIS)

    Stephan, P.M.

    1996-01-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Energy Science and Technology Database from January 1, 1995, through June 30, 1995. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it

  1. The process of selecting technology development projects: a practical framework

    NARCIS (Netherlands)

    Herps, Joost M.J.; van Mal, Herman H.; Halman, Johannes I.M.; Martens, Jack H.M.; Borsboom, Ron H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  2. The process of selecting technology development projects : a practical framework

    NARCIS (Netherlands)

    Herps, J.M.J.; Mal, van H.H.; Halman, J.I.M.; Martens, J.H.M.; Borsboom, R.H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  3. Research from Afar: Considerations for Conducting an Off-Site Research Project.

    Science.gov (United States)

    Williams, Reg Arthur; Hagerty, Bonnie M.; Hoyle, Kenneth; Yousha, Steven M.; Abdoo, Yvonne; Andersen, Curt; Engler, Dorothy

    1999-01-01

    Critical elements in the success of off-site research projects include the following: negotiation, attention to personnel issues, communication, participation of research subjects, data management, and concern for privacy issues. (SK)

  4. Site selection experience for a new low-level radioactive waste storage/disposal facility at the Savannah River Plant

    International Nuclear Information System (INIS)

    Towler, O.A.; Cook, J.R.; Helton, B.D.

    1985-10-01

    Preliminary performance criteria and site selection guides specific to the Savannah River Plant, were developed for a new low-level radioactive waste storage/disposal facility. These site selection guides were applied to seventeen potential sites identified at SRP. The potential site were ranked based on how well they met a set of characteristics considered important in site selection for a low-level radioactive waste disposal facility. The characteristics were given a weighting factor representing its relative importance in meeting site performance criteria. A candidate site was selected and will be the subject of a site characterization program

  5. Site selection for deep geologic repositories - Consequences for society, economy and environment

    International Nuclear Information System (INIS)

    2010-03-01

    In a few years, Switzerland will make the decision regarding site selection for geological underground repositories for the storage of radioactive wastes. Besides the safety issue, many citizens are interested in how such a repository will affect environment, economy and society in the selected site's region. This brochure summarizes the results of many studies on the socio-economic impacts of nuclear waste repositories. Radioactive wastes must be stored in such a way that mankind and environment are safely protected for a long period of time. How this goal may be achieved, is already known: geologic deep repositories warrant long-term safety. For the oncoming years in Switzerland the question is where the repository will be built. The search for an appropriate site for a repository in the proposed regions will launch discussions. Within the participative framework the regions may bring their requests. The demonstration of the safety of potential repository sites has the highest priority in the selection process. In the third procedural step additional rock investigations will be made. The socio-economic studies and the experience with existing plants show that radioactive waste management plants can be built and operated in good agreement with environmental requirements. The radioactive wastes in a deep underground repository are stored many hundred meters below the Earth's surface. There, they are isolated from our vital space. Technical barriers and the surrounding dense rock confinement prevent the release of radioactive materials into the environment. A deep repository has positive consequences for the regional economy. It increases trade and value creation and creates work places. The socio-economic impacts practically extend over one century, but strongly vary with time; they are the largest during the building period. High life quality and a positive population development in the selected site region are compatible with a deep repository. A fair and

  6. Soil attributes drive nest-site selection by the campo miner Geositta poeciloptera

    Science.gov (United States)

    Teixeira, João Paulo Gusmão; Solar, Ricardo; Vasconcelos, Bruno Nery F.; Fernandes, Raphael B. A.; Lopes, Leonardo Esteves

    2018-01-01

    Substrate type is a key-factor in nest-site selection and nest architecture of burrowing birds. However, little is known about which factors drive nest-site selection for these species, especially in the tropics. We studied the influence of soil attributes on nest-site selection by the campo miner Geositta poeciloptera, an open grassland bird that builds its nests within soil cavities. For all nests found, we measured the depth of the nest cavity and the resistance of the soil to penetration, and identified the soil horizon in which the nest was located. In soil banks with nests, we collected soil samples for granulometric analysis around each nest cavity, while in soil banks without nests we collected these samples at random points. From 43 nests found, 86% were located in the deeper soil horizons (C-horizon), and only 14% in the shallower horizons (B-horizon). Granulometric analysis showed that the C-horizons possessed a high similar granulometric composition, with high silt and low clay contents. These characteristics are associated with a low degree of structural development of the soil, which makes it easier to excavate. Contrarily, soil resistance to penetration does not seem to be an important criterion for nest site selection, although nests in more resistant the soils tend to have shallower nest cavities. Among the soil banks analyzed, 40% of those without cavities possessed a larger proportion of B-horizon relative to the C-horizon, and their texture was more clayey. On the other hand, almost all soil banks containing nest cavities had a larger C-horizon and a silty texture, indicating that soil attributes drive nest-site selection by G. poeciloptera. Thus, we conclude that the patchy distribution of G. poeciloptera can attributed to the infrequent natural exposure of the C-horizon in the tropical region, where well developed, deep and permeable soils are more common. PMID:29381768

  7. Soil attributes drive nest-site selection by the campo miner Geositta poeciloptera.

    Science.gov (United States)

    Meireles, Ricardo Camargos de; Teixeira, João Paulo Gusmão; Solar, Ricardo; Vasconcelos, Bruno Nery F; Fernandes, Raphael B A; Lopes, Leonardo Esteves

    2018-01-01

    Substrate type is a key-factor in nest-site selection and nest architecture of burrowing birds. However, little is known about which factors drive nest-site selection for these species, especially in the tropics. We studied the influence of soil attributes on nest-site selection by the campo miner Geositta poeciloptera, an open grassland bird that builds its nests within soil cavities. For all nests found, we measured the depth of the nest cavity and the resistance of the soil to penetration, and identified the soil horizon in which the nest was located. In soil banks with nests, we collected soil samples for granulometric analysis around each nest cavity, while in soil banks without nests we collected these samples at random points. From 43 nests found, 86% were located in the deeper soil horizons (C-horizon), and only 14% in the shallower horizons (B-horizon). Granulometric analysis showed that the C-horizons possessed a high similar granulometric composition, with high silt and low clay contents. These characteristics are associated with a low degree of structural development of the soil, which makes it easier to excavate. Contrarily, soil resistance to penetration does not seem to be an important criterion for nest site selection, although nests in more resistant the soils tend to have shallower nest cavities. Among the soil banks analyzed, 40% of those without cavities possessed a larger proportion of B-horizon relative to the C-horizon, and their texture was more clayey. On the other hand, almost all soil banks containing nest cavities had a larger C-horizon and a silty texture, indicating that soil attributes drive nest-site selection by G. poeciloptera. Thus, we conclude that the patchy distribution of G. poeciloptera can attributed to the infrequent natural exposure of the C-horizon in the tropical region, where well developed, deep and permeable soils are more common.

  8. Site selection and characterization processes for deep geologic disposal of high level nuclear waste

    International Nuclear Information System (INIS)

    Costin, L.S.

    1997-01-01

    In this paper, the major elements of the site selection and characterization processes used in the U. S. high level waste program are discussed. While much of the evolution of the site selection and characterization processes have been driven by the unique nature of the U. S. program, these processes, which are well-defined and documented, could be used as an initial basis for developing site screening, selection, and characterization programs in other countries. Thus, this paper focuses more on the process elements than the specific details of the U. S. program. (author). 3 refs., 2 tabs., 5 figs

  9. Site selection and characterization processes for deep geologic disposal of high level nuclear waste

    Energy Technology Data Exchange (ETDEWEB)

    Costin, L.S. [Sandia National Labs., Albuquerque, NM (United States)

    1997-12-31

    In this paper, the major elements of the site selection and characterization processes used in the U. S. high level waste program are discussed. While much of the evolution of the site selection and characterization processes have been driven by the unique nature of the U. S. program, these processes, which are well-defined and documented, could be used as an initial basis for developing site screening, selection, and characterization programs in other countries. Thus, this paper focuses more on the process elements than the specific details of the U. S. program. (author). 3 refs., 2 tabs., 5 figs.

  10. Identification of Site Selection Factors in the U.S. Franchise Restaurant Industry: An Exploratory Study

    OpenAIRE

    Park, Kunsoon

    2002-01-01

    The purpose of this study was to identify and rank the importance of the site selection factors that influence the U.S. franchise restaurant industry as well as rank the confidence level of the experts. To identify the site selection factors, this study sought assistance and support from restaurant professionals. The Delphi technique was used to elicit the opinions of a panel of experts regarding the site selection factors. The panel was composed of restaurant professionals of restaurant c...

  11. Review of potential EGS sites and possible EGS demonstration scenarios

    Energy Technology Data Exchange (ETDEWEB)

    None

    1999-09-01

    Review of potential sites for Enhanced Geothermal Systems (EGS) and development of reference scenarios for EGS demonstration projects are two sub-tasks included in the FY 1999 EGS Research and Development (R&D) Management Task (DOE Task Order Number DE-AT07-99ID60365, included in the Appendix of this report). These sub-tasks are consistent with the EGS Strategic Plan, which includes milestones relating to EGS site selection (Milestone 4, to be completed in 2004) and development of a cost-shared, pilot-scale demonstration project (Milestone 5, to be completed in 2008). The purpose of the present work is to provide some reference points for discussing what type of EGS projects might be undertaken, where they might be located, and what the associated benefits are likely to be. The review of potential EGS sites is presented in Chapter 2 of this report. It draws upon site-selection criteria (and potential project sites that were identified using those criteria) developed at a mini-workshop held at the April 1998 DOE Geothermal Program Review to discuss EGS R&D issues. The criteria and the sites were the focus of a paper presented at the 4th International Hot Dry Rock Forum in Strasbourg in September 1998 (Sass and Robertson-Tait, 1998). The selection criteria, project sites and possible EGS developments discussed in the workshop and paper are described in more detail herein. Input from geothermal operators is incorporated, and water availability and transmission-line access are emphasized. The reference scenarios for EGS demonstration projects are presented in Chapter 3. Three alternative scenarios are discussed: (1) a stand-alone demonstration plant in an area with no existing geothermal development; (2) a separate generating facility adjacent to an existing geothermal development; and (3) an EGS project that supplies an existing geothermal power plant with additional generating capacity. Furthermore, information potentially useful to DOE in framing solicitations and

  12. Landfill Gas Energy Project Data and Landfill Technical Data

    Science.gov (United States)

    This page provides data from the LMOP Database for U.S. landfills and LFG energy projects in Excel files, a map of project and candidate landfill counts by state, project profiles for a select group of projects, and information about Project Expo sites.

  13. Site remediation: The naked truth

    International Nuclear Information System (INIS)

    Calloway, J.M.

    1991-01-01

    The objective of any company faced with an environmental site remediation project is to perform the cleanup effectively at the lowest possible cost. Today, there are a variety of techniques being applied in the remediation of sites involving soils and sludges. The most popular include: stabilization, incineration, bioremediation and off-site treatment. Dewatering may also play an integral role in a number of these approaches. Selecting the most cost-effective technique for remediation of soils and sludges can be a formidable undertaking, namely because it is often difficult to quantify certain expenses in advance of the project. In addition to providing general cost guidelines for various aspects of soil and sludge remediation, this paper will show how some significant cost factors can be affected by conditions related to specific remediation projects and the cleanup technology being applied

  14. National radioactive waste repository site selection study. Phase 2. A report on public comment

    International Nuclear Information System (INIS)

    1995-11-01

    Agreement was reached in principle between State/Territory and the Commonwealth of Australia Governments that a suitable site for a radioactive wastes repository must be found. The discussion papers resulting from the Phase 1 and Phase 2 of the site selection study were released for public comment. The national repository will be for disposal of low level and short-lived intermediate level radioactive wastes streaming from the medical, research and industrial use of radioisotopes in Australia. The purpose of this report is to summarise and respond in general terms to comment received on the discussion paper -Phase 2 of the study. Forty five submissions were received. Of these: 18 supported the Phase 2 study approach and the concept of a national repository; 13 did not state a clear position but either requested more information or provided constructive comment on the siting process; 7 supported the site selection approach and the repository concept but suggested that the repository should not be sited in a particular area; 3 opposed the siting of the repository in their vicinity but not necessarily the repository concept and site selection approach; 4 opposed the concept of a national repository. This compares with 124 submissions on Phase 1 of the study, of which 57 opposed the national repository concept (52 of these were from letters elicited by Greenpeace) and 48 supported the establishment of a national repository and the site selection approach proposed. 3 figs

  15. The Rocky Flats Environmental Technology Site beryllium characterization project

    International Nuclear Information System (INIS)

    Morrell, D.M.; Miller, J.R.; Allen, D.F.

    1999-01-01

    A site beryllium characterization project was completed at the Rocky Flats Environmental Technology Site (RFETS) in 1997. Information from historical reviews, previous sampling surveys, and a new sampling survey were used to establish a more comprehensive understanding of the locations and levels of beryllium contamination in 35 buildings. A feature of the sampling strategy was to test if process knowledge was a good predictor of where beryllium contamination could be found. Results revealed that this technique was effective at identifying where surface contamination levels might exceed the RFETS smear control level but that it was not effective in identifying where low concentrations of beryllium might be found

  16. Successful community relations efforts at the Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    McKee, James E. Jr.; Meyer, Linda L.

    1992-01-01

    The Weldon Spring Site Remedial Action Project (WSSRAP) Community Relations Program involves many participants from the U.S. Department of Energy (DOE) and the Prime Management Contractor (PMC) composed of M.K. Ferguson and Jacobs Engineering. The proactive community relations plan exceeds the compliance requirements of NEPA and CERCLA and is coordinated by a three-person staff of professional communicators. The program permeates many of the operating decisions and the result has been public acceptance of the Project and its actions to date, which has been to conduct remedial actions that will place the site in a radiologically and chemically safe condition, eliminating potential hazards to the public and environment. (author)

  17. Natural resource risk and cost management in environmental restoration: Demonstration project at the Savannah River Site

    International Nuclear Information System (INIS)

    Bascietto, J.J.; Sharples, F.E.

    1995-01-01

    The US Department of Energy (DOE) is both a trustee for the natural resources present on its properties and the lead response agency under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As such, DOE is addressing the destruction or loss of those resources caused by releases of hazardous substances from its facilities (DOE 1991) and collecting data to be used in determining the extent of contamination at its facilities, estimating risks to human health and the environment, and selecting appropriate remedial actions. The remedial investigation/feasibility study (RI/FS) process is used to investigate sites and select remedial actions. A Natural Resource Damage Assessment (NRDA) process may be used to determine whether natural resources have also been injured by the released hazardous substances and to calculate compensatory monetary damages to be used to restore the natural resources. In FY 1994, the Savannah River Site (SRS) was chosen to serve as a demonstration site for testing the integrated NRDA framework and demonstrating how NRDA concerns might be integrated into the environmental restoration activities of an actual site that is characteristically large and complex. The demonstration project (1) provided a means to illustrate the use of complex analyses using real information on the specific natural resources of the SRS; (2) served as a vehicle for reinforcing and expanding the SRS staff's understanding of the links between the NRDA and RI/FS processes; (3) provided a forum for the discussion of strategic issues with SRS personnel; and (4) allowed the refining and elaboration of DOE guidance by benchmarking the theoretical process using real information and issues

  18. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    International Nuclear Information System (INIS)

    Ferguson Jones, Andrea; Lee, Angela; Palmeter, Tim

    2013-01-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

  19. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    Energy Technology Data Exchange (ETDEWEB)

    Ferguson Jones, Andrea; Lee, Angela [MMM Group Limited, 100 Commerce Valley Drive West, Thornhill, Ontario, L3T 0A1 (Canada); Palmeter, Tim [Public Works and Government Services Canada, 4900 Yonge Street, Toronto, Ontario, M2N 6A6 (Canada)

    2013-07-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

  20. Selection of nest-site habitat by interior least terns in relation to sandbar construction

    Science.gov (United States)

    Sherfy, Mark H.; Stucker, Jennifer H.; Buhl, Deborah A.

    2012-01-01

    Federally endangered interior least terns (Sternula antillarum) nest on bare or sparsely vegetated sandbars on midcontinent river systems. Loss of nesting habitat has been implicated as a cause of population declines, and managing these habitats is a major initiative in population recovery. One such initiative involves construction of mid-channel sandbars on the Missouri River, where natural sandbar habitat has declined in quantity and quality since the late 1990s. We evaluated nest-site habitat selection by least terns on constructed and natural sandbars by comparing vegetation, substrate, and debris variables at nest sites (n = 798) and random points (n = 1,113) in bare or sparsely vegetated habitats. Our logistic regression models revealed that a broader suite of habitat features was important in nest-site selection on constructed than on natural sandbars. Odds ratios for habitat variables indicated that avoidance of habitat features was the dominant nest-site selection process on both sandbar types, with nesting terns being attracted to nest-site habitat features (gravel and debris) and avoiding vegetation only on constructed sandbars, and avoiding silt and leaf litter on both sandbar types. Despite the seemingly uniform nature of these habitats, our results suggest that a complex suite of habitat features influences nest-site choice by least terns. However, nest-site selection in this social, colonially nesting species may be influenced by other factors, including spatial arrangement of bare sand habitat, proximity to other least terns, and prior habitat occupancy by piping plovers (Charadrius melodus). We found that nest-site selection was sensitive to subtle variation in habitat features, suggesting that rigor in maintaining habitat condition will be necessary in managing sandbars for the benefit of least terns. Further, management strategies that reduce habitat features that are avoided by least terns may be the most beneficial to nesting least terns.

  1. 40 CFR 228.6 - Specific criteria for site selection.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Specific criteria for site selection. 228.6 Section 228.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN..., nursery, feeding, or passage areas of living resources in adult or -juvenile phases; (3) Location in...

  2. Columbia River : Select Area Fishery Evaluation project : 1995-96 Annual Reports.

    Energy Technology Data Exchange (ETDEWEB)

    Hirose, Paul; Miller, Marc; Hill, Jim

    1998-06-01

    Water quality monitoring was conducted from November 1994 through October 1996 at five Oregon and three Washington select area study sites in the lower Columbia River. Physicochemical monitoring and aquatic biomonitoring programs were established to profile baseline parameters at each study site and document differences between study sites. Data collected at study sites where fish rearing operations were initiated indicate a potential negative impact on the surrounding benthic invertebrate communities.

  3. A proposed selection process in Over-The-Top project portfolio management

    Directory of Open Access Journals (Sweden)

    Jemy Vestius Confido

    2018-05-01

    Full Text Available Purpose: The purpose of this paper is to propose an Over-The-Top (OTT initiative selection process for communication service providers (CSPs entering an OTT business. Design/methodology/approach: To achieve this objective, a literature review was conducted to comprehend the past and current practices of the project (or initiative selection process as mainly suggested in project portfolio management (PPM. This literature was compared with specific situations and the needs of CSPs when constructing an OTT portfolio. Based on the contrast between the conventional project selection process and specific OTT characteristics, a different selection process is developed and tested using group model-building (GMB, which involved an in-depth interview, a questionnaire and a focus group discussion (FGD. Findings: The paper recommends five distinct steps for CSPs to construct an OTT initiative portfolio: candidate list of OTT initiatives, interdependency diagram, evaluation of all interdependent OTT initiatives, evaluation of all non-interdependent OTT initiatives and optimal portfolio of OTT initiatives. Research limitations/implications: The research is empirical, and various OTT services are implemented; the conclusion is derived only from one CSP, which operates as a group. Generalization of this approach will require further empirical tests on different CSPs, OTT players or any firms performing portfolio selection with a degree of interdependency among the projects. Practical implications: Having considered interdependency, the proposed OTT initiative selection steps can be further implemented by portfolio managers for more effective OTT initiative portfolio construction. Originality/value: While the previous literature and common practices suggest ensuring the benefits (mainly financial of individual projects, this research accords higher priority to the success of the overall OTT initiative portfolio and recommends that an evaluation of the overall

  4. The alternative site selection procedure as covered in the report by the Repository Site Selection Procedures Working Group; Das Verfahren der alternativen Standortsuche im Bericht des Arbeitskreises Auswahlverfahren Endlagerstandorte

    Energy Technology Data Exchange (ETDEWEB)

    Brenner, M. [Jena Univ. (Germany). Juristische Fakultaet

    2005-01-01

    The 2002 Act on the Regulated Termination of the Use of Nuclear Power for Industrial Electricity Generation declared Germany's opting out of the peaceful uses of nuclear power. The problem of the permanent management of radioactive residues is becoming more and more important also in the light of that political decision. At the present time, there are no repositories offering the waste management capacities required. Such facilities need to be created. At the present stage, eligible repository sites are the Konrad mine, a former iron ore mine near Salzgitter, and the Gorleben salt dome. While the fate of the Konrad mine as a repository for waste generating negligible amounts of heat continues to be uncertain, despite a plan approval decision of June 2002, the Gorleben repository is still in the planning phase, at present in a dormant state, so to speak. The federal government expressed doubt about the suitability of the Gorleben site. Against this backdrop, the Federal Ministry for the Environment, Nature Conservation, and Nuclear Safety in February 1999 established AkEnd, the Working Group on Repository Site Selection Procedures. The Group was charged with developing, based on sound scientific criteria, a transparent site selection procedure in order to facilitate the search for repository sites. The Working Group presented its final report in December 2002 after approximately four years of work. The Group's proposals about alternative site selection procedures are explained in detail and, above all, reviewed critically. (orig.)

  5. Simulation Experiment on Landing Site Selection Using a Simple Geometric Approach

    Science.gov (United States)

    Zhao, W.; Tong, X.; Xie, H.; Jin, Y.; Liu, S.; Wu, D.; Liu, X.; Guo, L.; Zhou, Q.

    2017-07-01

    Safe landing is an important part of the planetary exploration mission. Even fine scale terrain hazards (such as rocks, small craters, steep slopes, which would not be accurately detected from orbital reconnaissance) could also pose a serious risk on planetary lander or rover and scientific instruments on-board it. In this paper, a simple geometric approach on planetary landing hazard detection and safe landing site selection is proposed. In order to achieve full implementation of this algorithm, two easy-to-compute metrics are presented for extracting the terrain slope and roughness information. Unlike conventional methods which must do the robust plane fitting and elevation interpolation for DEM generation, in this work, hazards is identified through the processing directly on LiDAR point cloud. For safe landing site selection, a Generalized Voronoi Diagram is constructed. Based on the idea of maximum empty circle, the safest landing site can be determined. In this algorithm, hazards are treated as general polygons, without special simplification (e.g. regarding hazards as discrete circles or ellipses). So using the aforementioned method to process hazards is more conforming to the real planetary exploration scenario. For validating the approach mentioned above, a simulated planetary terrain model was constructed using volcanic ash with rocks in indoor environment. A commercial laser scanner mounted on a rail was used to scan the terrain surface at different hanging positions. The results demonstrate that fairly hazard detection capability and reasonable site selection was obtained compared with conventional method, yet less computational time and less memory usage was consumed. Hence, it is a feasible candidate approach for future precision landing selection on planetary surface.

  6. SIMULATION EXPERIMENT ON LANDING SITE SELECTION USING A SIMPLE GEOMETRIC APPROACH

    Directory of Open Access Journals (Sweden)

    W. Zhao

    2017-07-01

    Full Text Available Safe landing is an important part of the planetary exploration mission. Even fine scale terrain hazards (such as rocks, small craters, steep slopes, which would not be accurately detected from orbital reconnaissance could also pose a serious risk on planetary lander or rover and scientific instruments on-board it. In this paper, a simple geometric approach on planetary landing hazard detection and safe landing site selection is proposed. In order to achieve full implementation of this algorithm, two easy-to-compute metrics are presented for extracting the terrain slope and roughness information. Unlike conventional methods which must do the robust plane fitting and elevation interpolation for DEM generation, in this work, hazards is identified through the processing directly on LiDAR point cloud. For safe landing site selection, a Generalized Voronoi Diagram is constructed. Based on the idea of maximum empty circle, the safest landing site can be determined. In this algorithm, hazards are treated as general polygons, without special simplification (e.g. regarding hazards as discrete circles or ellipses. So using the aforementioned method to process hazards is more conforming to the real planetary exploration scenario. For validating the approach mentioned above, a simulated planetary terrain model was constructed using volcanic ash with rocks in indoor environment. A commercial laser scanner mounted on a rail was used to scan the terrain surface at different hanging positions. The results demonstrate that fairly hazard detection capability and reasonable site selection was obtained compared with conventional method, yet less computational time and less memory usage was consumed. Hence, it is a feasible candidate approach for future precision landing selection on planetary surface.

  7. Preliminary site characterization radiological monitoring plan for the Nevada Nuclear Waste Storage Investigations Project, Yucca Mountain Site

    International Nuclear Information System (INIS)

    1987-03-01

    The activities described in this plan occur in the early phases of site characterization. This document presents the Preliminary Site Characterization Radiological Monitoring Plan (PSCRMP) for collecting and evaluating data in support of the NNWSI Project. The PSCRMP defines and identifies control procedures for the monitoring activities. The PSCRMP activity will utilize integrating radon monitoring devices, a continuous radon monitor, and a particulate air sampler. These instruments will be used to establish the baseline radioactivity and/or radioactivity released due to early site characterization activities. The sections that follow provide a general project description, the specifics of the monitoring program, and the practices that will be employed to ensure the validity of the collected data by integrating quality assurance into all activities. Section 2 of this document describes the regulatory base of this document. Section 3 describes the site characterization activities which may lead to release of radioactivity. Section 4 provides a description of the potential sources of radioactivity that site characterization could generate. Section 5 summarizes the sampling and monitoring methodology, which will be used to monitor the potential sources of radioactivity. The network of sampling and monitoring equipment is described in Section 6, and Section 7 summarizes the systems operation activities. The data reporting activities are described in Section 8. Finally, a description of the Quality Assurance (QA) and Quality Control (QC) activities is provided in Section 9. Appendix A contains a summary of the procedures to be used in this program, and Appendix B contains technical specification on equipment and services. 20 refs., 11 figs., 2 tabs

  8. Integrated account of method, site selection and programme prior to the site investigation phase

    International Nuclear Information System (INIS)

    2000-12-01

    applications and have these applications reviewed by the appropriate authorities. An analysis of conceivable alternatives for managing and disposing of spent nuclear fuel has confirmed that deep geological disposal according to the KBS-3 method has the best prospects of meeting all requirements. The alternative of putting off a decision until some future time (the zero alternative) does not appear tenable. The assessment of long-term safety shows that the prospects of building a safe deep repository in the Swedish bedrock are good. Independent Swedish and international review of the safety assessment confirm that the body of data in this respect is adequate for the siting process to proceed to the site investigation phase. A fuller summary is given below of the account given in this report of method as well as site selection and programme for the site investigation phase. The point of departure for the account is the review comments made by the regulatory authorities and the Government's decision regarding RD and D-Programme 98. In its decision, the Government stipulated conditions for SKB's continued research and development programme. The analysis of alternative system designs was to be supplemented, mainly with regard to the zero alternative and very deep boreholes. Furthermore, the Government decided that SKB shall submit an integrated evaluation of completed feasibility studies and other background material for selection of sites for site investigations and present a clear programme for site investigations

  9. A game-theoretical model for selecting a site of non-preferred waste facilities

    International Nuclear Information System (INIS)

    Kim, Seong Ho; Kim, Tae Woon

    2006-01-01

    In the present work, a game-theoretic model (GTM) as a tool of conflict analysis is proposed for multiplayer multicriteria decision-making problems in a conflict situation. The developed GTM is used for obtaining the most possible resolutions in the conflict among multiple decision makers. The GTM is based on directed graph structure and solution concepts. To demonstrate the performance of the GTM, using a numerical example, the GTM is applied to an environmental conflict problem, especially a non-preferred waste disposal siting conflict available in the literature. It is found that with GTM the states in equilibrium can be recognized. The conflict under consideration is to select a site of non-preferred waste facilities. The government is to choose a site of installation for users of a toxic waste disposal facility. A certain time-point of interest is a period of time to select one of candidate sites that completely meet regular criteria of governmental body in charge of permitting a facility site. The facility siting conflict among multiple players (i.e., decision-makers, DMs) of concern is viewed as a multiple player-multiple criteria (MPMC) domain. For instance, three possible sites (i.e., site A, site B, and site C) to be selected by multiple players are characterized by the building cost, accessibility, and proximity to the residential area. Concerning the site A, the installation of a facility is not expensive, the accessible to a facility is easy, and the site A is located very near a residential area. Concerning site B, the facility is expensive to build, the facility is easily accessible, and the site is located near the residential area. Concerning site C, the installation cost is expensive, the accessibility is difficult, and the location of site is far from the residential area. In simple models, three main groups of players could be considered to be the government, users, and local residents. The government is to play a role as one of proponents or

  10. Facility siting as a decision process at the Savannah River Site

    International Nuclear Information System (INIS)

    Wike, L.D.

    1995-01-01

    Site selection for new facilities at Savannah River Site (SRS) historically has been a process dependent only upon specific requirements of the facility. While this approach is normally well suited to engineering and operational concerns, it can have serious deficiencies in the modern era of regulatory oversight and compliance requirements. There are many issues related to the site selection for a facility that are not directly related to engineering or operational requirements; such environmental concerns can cause large schedule delays and budget impact,s thereby slowing or stopping the progress of a project. Some of the many concerns in locating a facility include: waste site avoidance, National Environmental Policy Act requirements, Clean Water Act, Clean Air Act, wetlands conservation, US Army Corps of Engineers considerations, US Fish and Wildlife Service statutes including threatened and endangered species issues, and State of South Carolina regulations, especially those of the Department of Health and Environmental Control. In addition, there are SRS restrictions on research areas set aside for National Environmental Research Park (NERP), Savannah River Ecology Laboratory, Savannah River Forest Station, University of South Carolina Institute of Archaeology and Anthropology, Southeastern Forest Experimental Station, and Savannah River Technology Center (SRTC) programs. As with facility operational needs, all of these siting considerations do not have equal importance. The purpose of this document is to review recent site selection exercises conducted for a variety of proposed facilities, develop the logic and basis for the methods employed, and standardize the process and terminology for future site selection efforts

  11. 1995 project of the year Hanford Environmental compliance project nomination

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders` objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring.

  12. 1995 project of the year Hanford Environmental compliance project nomination

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders' objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring

  13. Site environmental report for the Yucca Mountain Project. Calendar Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2006-10-01

    This site environmental report describes the environmental program conducted during 2005 by the U.S. Department of Energy, Office of Repository Development. The report describes the environmental laws and regulations that were applicable to the Yucca Mountain Project in 2005, the actions taken to comply with those laws and regulations, and the Project’s environmental program. The report also summarizes the data collected to monitor potential impacts of the Project on the environment.

  14. EPRTM project experience: selection of partners and supply chain; Experiencia en Proyectos de EPTTM: seleccion de socios y cadena de suministros

    Energy Technology Data Exchange (ETDEWEB)

    Lorenzo, D. de

    2012-07-01

    With 4 EPRTM units under construction, the new plants to be built in the following years will benefit from the return on experience of the work already performed. The knowledge about licensing processes, detail engineering, supply chain, logistics and on-site work gathered from the Olkiluoto 3 and Flamanville 3 projects has already been used in the Taishan 1 and 2 project, resulting in a project that is on schedule and on budget. This article will show how the advantage of such broad experience gained will be used to benefit future projects to ensure certainty of completion, leaving few and limited unresolved issues even before the beginning of the project. Several areas that are not usually tackled when speaking of a New Build project will be covered by this text from the point of view of a nuclear vendor: Project Partnership Selection and the Gate Review Process applied by AREVA in the supply chain of the main components. (Author)

  15. Continuous, environmental radon monitoring program at the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Liu, N.; Sorensen, C.D.; Tung, C.H.; Orchard, C.R.

    1995-01-01

    A continuous, environmental radon monitoring program has been established in support of the Department of Energy's (DOE) Yucca Mountain Site Characterization Project (YMP). The monitoring program is to characterize the natural radon emissions at the YMP site, to understand the existing radon concentrations in the environmental background, and to assess and control the potential work exposure. Based upon a study of the monitoring results, this paper presents a preliminary understanding of the magnitudes, characteristics, and exposure levels of radon at the YMP site

  16. Project Surveillance and Maintenance Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the [guidance] to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs

  17. Report on the Survey on Regulation of Site Selection and Preparation

    International Nuclear Information System (INIS)

    Webster, Philip

    2010-01-01

    At its first meeting in May 2008, the Working Group discussed a task to 'Prepare a report reviewing the various practices used by regulators in the regulation of nuclear power plant siting. The report should consider regulator practices on sites where a mixture of activities are taking place (e.g. operating units, new construction, decommissioning, etc) including organization of the regulators organisation, methods, systems, etc.'. Following discussion, the Working Group assigned an Action 1-5 to 'develop a survey on the regulation of nuclear sites including seismicity issues, security issues, multi-units aspects and regulator practices on sites where a mixture of activities are taking place (e.g. operating units, new construction, decommissioning, etc.)'. The Survey was prepared and issued by the NEA in July 2008 with a request to the member states to provide their responses by the next meeting of the Working Group in October 2008. In addition to addressing the specific topics actioned by the Working Group, the Survey also investigated the broader context of siting, in order to address the Mandate that had been approved by the CNRA. The questions in the survey therefore covered the topics of site evaluation, site selection, regulatory approval, site preparation and regulatory oversight. A topic of particular interest was to what extent IAEA guidance on site evaluation was followed. The survey considered the possibility that a body other than the safety regulator may approve the choice of site or permit the applicant to start to prepare it. The survey also investigated the existence of formal requirements and informal expectations, recognizing that these both form part of the regulatory tool-kit. Responses were received from all twelve member states that were then members of the Working Group. The responses were reviewed at the second meeting of the Working Group in October 2008. In general, it could be stated that new reactors are licensed in

  18. A project-based geoscience curriculum: select examples

    Science.gov (United States)

    Brown, L. M.; Kelso, P. R.; White, R. J.; Rexroad, C. B.

    2007-12-01

    Principles of constructivist educational philosophy serve as a foundation for the recently completed National Science Foundation sponsored undergraduate curricular revision undertaken by the Geology Department of Lake Superior State University. We integrate lecture and laboratory sessions utilizing active learning strategies that focus on real-world geoscience experiences and problems. In this presentation, we discuss details of three research-like projects that require students to access original data, process and model the data using appropriate geological software, interpret and defend results, and disseminate results in reports, posters, and class presentations. The projects are from three upper division courses, Carbonate Systems, Sequence Stratigraphy, and Geophysical Systems, where teams of two to four students are presented with defined problems of durations ranging from a few weeks to an entire semester. Project goals and location, some background information, and specified dates and expectations for interim and final written and oral reports are provided to students. Some projects require the entire class to work on one data set, some require each team to be initially responsible for a portion of the project with teams ultimately merging data for interpretation and to arrive at final conclusions. Some projects require students to utilize data from appropriate geological web sites such as state geological surveys. Others require students to design surveys and utilize appropriate instruments of their choice for field data collection. Students learn usage and applications of appropriate geological software in compiling, processing, modeling, and interpreting data and preparing formal reports and presentations. Students uniformly report heightened interest and motivation when engaged in these projects. Our new curriculum has resulted in an increase in students" quantitative and interpretive skills along with dramatic improvement in communication and

  19. Selecting Large Portfolios of Social Projects in Public Organizations

    Directory of Open Access Journals (Sweden)

    Igor Litvinchev

    2014-01-01

    Full Text Available We address the portfolio selection of social projects in public organizations considering interdependencies (synergies affecting project funds requirements and tasks. A mixed integer linear programming model is proposed incorporating the most relevant aspects of the problem found in the literature. The model supports both complete (all or nothing and partial (a certain amount from a given interval of funding resource allocation policies. Numerical results for large-scale problem instances are presented.

  20. Missouri Department of Natural Resources Hazardous Waste Program Weldon Spring site remedial action project. Status of project to date January 1997

    International Nuclear Information System (INIS)

    1998-01-01

    This document describes the progress made by the Missouri Department of Natural Resources (MDNR) during the fourth year (1996) of the Agreement in Support (AIS) in its oversight role of the Weldon Springs Site Remedial Action Project (WSSRAP). The fourth year at the Weldon Springs Site shows sustained progress as the project moves through the final design and into the remedial action phases of the Chemical Plant Operable Unit. The remedial action phase includes the Foundations Removal work package, Chemical Solidification and Stabilization, and disposal cell

  1. High resolution x-ray fluorescence spectroscopy - a new technique for site- and spin-selectivity

    International Nuclear Information System (INIS)

    Wang, Xin

    1996-12-01

    X-ray spectroscopy has long been used to elucidate electronic and structural information of molecules. One of the weaknesses of x-ray absorption is its sensitivity to all of the atoms of a particular element in a sample. Through out this thesis, a new technique for enhancing the site- and spin-selectivity of the x-ray absorption has been developed. By high resolution fluorescence detection, the chemical sensitivity of K emission spectra can be used to identify oxidation and spin states; it can also be used to facilitate site-selective X-ray Absorption Near Edge Structure (XANES) and site-selective Extended X-ray Absorption Fine Structure (EXAFS). The spin polarization in K fluorescence could be used to generate spin selective XANES or spin-polarized EXAFS, which provides a new measure of the spin density, or the nature of magnetic neighboring atoms. Finally, dramatic line-sharpening effects by the combination of absorption and emission processes allow observation of structure that is normally unobservable. All these unique characters can enormously simplify a complex x-ray spectrum. Applications of this novel technique have generated information from various transition-metal model compounds to metalloproteins. The absorption and emission spectra by high resolution fluorescence detection are interdependent. The ligand field multiplet model has been used for the analysis of Kα and Kβ emission spectra. First demonstration on different chemical states of Fe compounds has shown the applicability of site selectivity and spin polarization. Different interatomic distances of the same element in different chemical forms have been detected using site-selective EXAFS

  2. Targeting hunter distribution based on host resource selection and kill sites to manage disease risk.

    Science.gov (United States)

    Dugal, Cherie J; van Beest, Floris M; Vander Wal, Eric; Brook, Ryan K

    2013-10-01

    Endemic and emerging diseases are rarely uniform in their spatial distribution or prevalence among cohorts of wildlife. Spatial models that quantify risk-driven differences in resource selection and hunter mortality of animals at fine spatial scales can assist disease management by identifying high-risk areas and individuals. We used resource selection functions (RSFs) and selection ratios (SRs) to quantify sex- and age-specific resource selection patterns of collared (n = 67) and hunter-killed (n = 796) nonmigratory elk (Cervus canadensis manitobensis) during the hunting season between 2002 and 2012, in southwestern Manitoba, Canada. Distance to protected area was the most important covariate influencing resource selection and hunter-kill sites of elk (AICw = 1.00). Collared adult males (which are most likely to be infected with bovine tuberculosis (Mycobacterium bovis) and chronic wasting disease) rarely selected for sites outside of parks during the hunting season in contrast to adult females and juvenile males. The RSFs showed selection by adult females and juvenile males to be negatively associated with landscape-level forest cover, high road density, and water cover, whereas hunter-kill sites of these cohorts were positively associated with landscape-level forest cover and increasing distance to streams and negatively associated with high road density. Local-level forest was positively associated with collared animal locations and hunter-kill sites; however, selection was stronger for collared juvenile males and hunter-killed adult females. In instances where disease infects a metapopulation and eradication is infeasible, a principle goal of management is to limit the spread of disease among infected animals. We map high-risk areas that are regularly used by potentially infectious hosts but currently underrepresented in the distribution of kill sites. We present a novel application of widely available data to target hunter distribution based on host resource

  3. WSSRAP chemical plant geotechnical investigations for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1990-12-01

    This document has been prepared for the United states Department of Energy (DOE) Weldon Spring Site Remedial Action Project (WSSRAP) by the Project Management Contractor (PMC), which consists of MK-Ferguson Company (MKF) and Morrison Knudsen Corporation Environmental Services Group (MKES) with Jacobs Engineering Group (JEG) as MKF's predesignated subcontractor. This report presents the results of site geotechnical investigations conducted by the PMC in the vicinity of the Weldon Spring chemical plant and raffinate pits (WSCP/RP) and in potential on-site and off-site clayey material borrow sources. The WSCP/RP is the proposed disposal cell (DC) site. 39 refs., 24 figs., 12 tabs

  4. Application of geographical information system in disposal site selection for hazardous wastes.

    Science.gov (United States)

    Rezaeimahmoudi, Mehdi; Esmaeli, Abdolreza; Gharegozlu, Alireza; Shabanian, Hassan; Rokni, Ladan

    2014-01-01

    The aim of this study was to provide a scientific method based on Geographical Information System (GIS) regarding all sustainable development measures to locate a proper landfill for disposal of hazardous wastes, especially industrial (radioactive) wastes. Seven effective factors for determining hazardous waste landfill were applied in Qom Province, central Iran. These criteria included water, slope, population centers, roads, fault, protected areas and geology. The Analysis Hierarchical Process (AHP) model based on pair comparison was used. First, the weight of each factor was determined by experts; afterwards each layer of maps entered to ARC GIS and with special weight multiplied together, finally the best suitable site was introduced. The most suitable sites for burial were in northwest and west of Qom Province and eventually five zones were introduced as the sample sites. GIs and AHP model is introduced as the technical, useful and accelerator tool for disposal site selection. Furthermore it is determined that geological factor is the most effective layer for site selection. It is suggested that geological conditions should be considered primarily then other factors are taken into consideration.

  5. DECHEM: A remedial planning tool for metallic contaminants in soil at UMTRA Project sites

    International Nuclear Information System (INIS)

    1989-03-01

    The DECHEM (DEcontamination of CHEMicals) method was developed for the Uranium Mill Tailings Remedial Action (UMTRA) Project to guide characterization and remedial planning for metals contamination in soils. This is necessary because non-radiological hazardous constituents may be more mobile than radium-226 (Ra-226), and hence may migrate more deeply into subpile soils (beneath tailings that are to be relocated) or into adjacent contaminated soils at UMTRA Project sites. The result is that remedial action to the Ra-226 excavation limit, as specified in the US Environmental Protection Agency (EPA) standards, may not adequately remove hazardous non-radiological contamination. Unmitigated, these contaminants in soil may cause health risks because of their presence in resuspended particles, their uptake by crops or fodder their seepage into aquifers used for drinking water or other possible exposure pathways. The DECHEM method was developed in response to the need for advanced planning for the remediation of chemical contaminants at UMTRA Project sites, and includes the following elements: Establishment of acceptable exposure rates for humans to chemicals, based on EPA guidelines or other toxicological literature. Modeling of chemical migration through environmental pathways from a remediated UMTRA Project site to humans. Determination of allowable residual concentrations (i.e., cleanup guidelines) for chemicals in soils that results in doses to humans that are below established acceptable exposure rates. The initial development and application of the DECHEM method has focused upon hazardous metallic contaminants such as arsenic, lead, molybdenum, and selenium, which are known to occur in elevated concentrations at some UMTRA Project sites

  6. Site quality in Appalachian hardwoods: the biological and economic response under selection silviculture

    Science.gov (United States)

    Orris D. McCauley; George R., Jr. Trimble

    1975-01-01

    The relative or percentage value response after 12 years of selective cutting practices on low- and high-quality sites in Appalachian hardwoods amounted to a 119-percent increase on the low-quality site and 145 percent on the high-quality site. The absolute value or actual dollar response, on the other hand, showed that the low-quality site increased in value only $76/...

  7. NPD project portfolio selection using reinvestment strategy in competitive environment

    Directory of Open Access Journals (Sweden)

    Alireza Ghassemi

    2018-01-01

    Full Text Available This study aims to design a new model for selecting most fitting new product development projects in a pool of projects. To catch the best model, we assume new products will be introduced to the competitive markets. Also, we suppose the revenue yielded by completed projects can be reinvested on implementation of other projects. Other sources of financing are borrowing loans from banks and initial capital of the firm. These limited resources determine most evaluated projects to be performed. Several types of interactions among different projects are considered to make the chosen projects more like a portfolio. In addition, some numerical examples from the real world are provided to demonstrate the applicability of the proposed model. These examples show how the particular considerations in the suggested model affect the results.

  8. Controlling engineering project changes for multi-unit, multi-site standardized nuclear power plants

    International Nuclear Information System (INIS)

    Randall, E.; Boddeker, G.; McGugin, H.; Strother, E.; Waggoner, G.

    1978-01-01

    Multibillioin dollar multiple nuclear power plant projects have numerous potential sources of engineering changes. The majority of these are internally generated changes, client generated changes, and changes from construction, procurement, other engineering organizations, and regulatory organizations. For multiunit, multisite projects, the use of a standardized design is cost effective. Engineering changes can then be controlled for a single standardized design, and the unit or site unique changes can be treated as deviations. Once an effective change procedure is established for change control of the standardized design, the same procedures can be used for control of unit or site unique changes

  9. Development of MCESC software for selecting the best stormwater erosion and sediment control measure in Malaysian construction sites

    Energy Technology Data Exchange (ETDEWEB)

    Al-Hadu, Ibrahiem Abdul Razak; Sidek, Lariyah Mohd [Civil Engineering Universiti Tenaga Nasional, Kajan, Selangor (Malaysia); Desa, Mohamed Nor Mohamed; Basri, Noor Ezlin Ahmad [Civil and Structural Engineering, Universiti Kebangsaan Malaysia, Bangi, Selangor (Malaysia)

    2012-07-01

    Malaysia located in a tropical region which is interested with a heavy rainfall through the whole seasons of the year. Construction stages usually associated with soil disturbing due to land clearing and grading activities, this combined with the tropical climate in Malaysia, will generate an enormous amount of soil to be eroded and then deposited into the adjacent water bodies. There are many kinds of mitigation measures used so as to reduce the impact of erosion and sedimentation that are generated due to the stormwater in construction sites. This paper aims to develop and apply Multi Criteria Analysis (MCA) software called Multi Criteria Erosion and Sediment Control (MCESC) software in which it can be applied in selecting the best stormwater control measure by depending on specified criteria and criterion weight. Visual Basic 6 was adopted as a development tool. This software can help the engineers, contractors on site and decision makers to find the best stormwater control measure in any construction site in Malaysia. Users of the MCESC software are given the opportunity to select the best stormwater control measure via expert's judgments that are built in the system or via their own expertise. MCESC software has many benefits since the experts are not always available and the consultancy is a costly issue which add further financial allocations to the project.

  10. Dynamic Disturbance Processes Create Dynamic Lek Site Selection in a Prairie Grouse.

    Directory of Open Access Journals (Sweden)

    Torre J Hovick

    Full Text Available It is well understood that landscape processes can affect habitat selection patterns, movements, and species persistence. These selection patterns may be altered or even eliminated as a result of changes in disturbance regimes and a concomitant management focus on uniform, moderate disturbance across landscapes. To assess how restored landscape heterogeneity influences habitat selection patterns, we examined 21 years (1991, 1993-2012 of Greater Prairie-Chicken (Tympanuchus cupido lek location data in tallgrass prairie with restored fire and grazing processes. Our study took place at The Nature Conservancy's Tallgrass Prairie Preserve located at the southern extent of Flint Hills in northeastern Oklahoma. We specifically addressed stability of lek locations in the context of the fire-grazing interaction, and the environmental factors influencing lek locations. We found that lek locations were dynamic in a landscape with interacting fire and grazing. While previous conservation efforts have treated leks as stable with high site fidelity in static landscapes, a majority of lek locations in our study (i.e., 65% moved by nearly one kilometer on an annual basis in this dynamic setting. Lek sites were in elevated areas with low tree cover and low road density. Additionally, lek site selection was influenced by an interaction of fire and patch edge, indicating that in recently burned patches, leks were located near patch edges. These results suggest that dynamic and interactive processes such as fire and grazing that restore heterogeneity to grasslands do influence habitat selection patterns in prairie grouse, a phenomenon that is likely to apply throughout the Greater Prairie-Chicken's distribution when dynamic processes are restored. As conservation moves toward restoring dynamic historic disturbance patterns, it will be important that siting and planning of anthropogenic structures (e.g., wind energy, oil and gas and management plans not view lek

  11. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12

    International Nuclear Information System (INIS)

    1991-09-01

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764

  12. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P. T.; Webb, J. R.; Knox, N. P.; Goins, L. F.; Harrell, R. E.; Mallory, P. K.; Cravens, C. D.

    1991-09-01

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

  13. Expert and non-expert groups perception of LILW repository site selection procedure

    International Nuclear Information System (INIS)

    Zeleznik, N.; Polic, M.

    2001-01-01

    Slovenia is now in the process of the site selection for a low and intermediate level radioactive waste (LILW) repository. Earlier searches for the LILW repository site confronted the Agency for radwaste management (ARAO) with a number of problems, mainly concerning the contacts with the local communities and their willingness to accept the repository. Therefore the Agency started with a new, so-called mixed mode approach to the site selection, where the special role of a mediator is introduced. The mediator represents the link between the investor and the local community, and facilitates the communication and negotiations between both. In this study we try to find out how people perceive the mediating process and conditions under which the LILW repository would be accepted in the local community. Therefore a special survey was conducted. The results showed some of the conditions under which participants would possibly accept the LILW repository. Differences in the perception between non-expert and expert groups were demonstrated and analysed, especially in the assessment of the consequences of LILW repository construction on the environment. Also the socio-psychological influences of the LILW repository were noted and examined. Consequences and recommendations for future work on the site selection procedure were prepared on the basis of the research results.(author)

  14. NEST-SITE SELECTION IN THE CAPE SUGARBIRD We dedicate ...

    African Journals Online (AJOL)

    These data, together with those on heat loss from an incubating bird, are ... in relation to nest-site selection as adaptive behaviour promoting breeding success through ... ability of food, in the form of nectar and nectiferous insects and arachnids .... cup of the nest, and the percentage vegetation cover was determined with the ...

  15. (-)PPAP: a new and selective ligand for sigma binding sites.

    Science.gov (United States)

    Glennon, R A; Battaglia, G; Smith, J D

    1990-11-01

    Most agents employed for the investigation of sigma (sigma) binding sites display relatively low affinity for these sites, bind both at sigma sites and at either phencyclidine (PCP) sites or dopamine receptors with similar affinity, and/or produce some dopaminergic activity in vivo. We describe a new agent, (-)PPAP or R(-)-N-(3-phenyl-n-propyl)-1-phenyl-2-aminopropane hydrochloride, that binds with high affinity and selectivity at sigma (IC50 = 24 nM) versus either PCP sites (IC50 greater than 75,000 nM) or D1 and D2 dopamine receptors (IC50 greater than 5,000 nM). The sigma affinity of this agent is comparable to that of the standard ligands (+)-3-PPP and DTG. Furthermore, although (-)PPAP is structurally related to amphetamine, it neither produces nor antagonizes amphetamine-like stimulus effect in rats trained to discriminate 1 mg/kg of S(+)amphetamine from saline.

  16. Report on ''questions of site selection''

    International Nuclear Information System (INIS)

    Alt, Stefan; Kallenbach-Herbert, Beate; Neles, Julia

    2016-01-01

    The report on radioactive waste site selection questions covers the following issues: excluded options: disposal in space, Antarctic, Greenland or oceans, surface storage without final deep geologic repository; possible alternatives: final disposal in deep boreholes, long-term interim storage, transmutation; central confinement function for radioactive wastes - geologic and/or technical barriers? Final repository monitoring: geo-scientific exclusion criteria, geo-scientific minimum requirements, geo-scientific decision criteria; geo-scientific data: information status and handling of regions with non-sufficient geo-scientific data; scientific planning criteria: basis for definitions concerning the content, procedural aspects; analysis of the socio-economic potential; requirements for the disposal of further radioactive wastes; requirements concerning the containers for final disposal.

  17. Site study plan for Playa investigations, Deaf Smith County, Texas: Salt Repository Project

    International Nuclear Information System (INIS)

    1987-01-01

    This plan defines the purpose and objectives of the Playa Investigation Study, presents a plan of work to provide the information necessary to resolve issues, and discusses the rationale for test method selection. The required information will be obtained from existing well drilling records, describing and testing of soil and rock samples recovered from project test holes, geophysical well logs, seismic surveys, and shallow test pits excavated at ground surface. There have been numerous, often conflicting, theories presented to explain the origin(s) of the playas of the Texas High Plains. The primary purpose of this study is to establish if existing playas and playa alignments are related to deeper subsurface structure, such as faulting or salt dissolution, the potential for future playa development, and the significance of existing and/or future playas on siting a repository in Deaf Smith County, Texas. 11 refs

  18. Positive selection neighboring functionally essential sites and disease-implicated regions of mammalian reproductive proteins.

    LENUS (Irish Health Repository)

    Morgan, Claire C

    2010-01-01

    ABSTRACT: BACKGROUND: Reproductive proteins are central to the continuation of all mammalian species. The evolution of these proteins has been greatly influenced by environmental pressures induced by pathogens, rival sperm, sexual selection and sexual conflict. Positive selection has been demonstrated in many of these proteins with particular focus on primate lineages. However, the mammalia are a diverse group in terms of mating habits, population sizes and germ line generation times. We have examined the selective pressures at work on a number of novel reproductive proteins across a wide variety of mammalia. RESULTS: We show that selective pressures on reproductive proteins are highly varied. Of the 10 genes analyzed in detail, all contain signatures of positive selection either across specific sites or in specific lineages or a combination of both. Our analysis of SP56 and Col1a1 are entirely novel and the results show positively selected sites present in each gene. Our findings for the Col1a1 gene are suggestive of a link between positive selection and severe disease type. We find evidence in our dataset to suggest that interacting proteins are evolving in symphony: most likely to maintain interacting functionality. CONCLUSION: Our in silico analyses show positively selected sites are occurring near catalytically important regions suggesting selective pressure to maximize efficient fertilization. In those cases where a mechanism of protein function is not fully understood, the sites presented here represent ideal candidates for mutational study. This work has highlighted the widespread rate heterogeneity in mutational rates across the mammalia and specifically has shown that the evolution of reproductive proteins is highly varied depending on the species and interacting partners. We have shown that positive selection and disease are closely linked in the Col1a1 gene.

  19. West Valley Demonstration Project site environmental report calendar year 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1998 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  20. West Valley Demonstration Project site environmental report, calendar year 1999

    Energy Technology Data Exchange (ETDEWEB)

    None Available

    2000-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1999 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  1. West Valley Demonstration Project site environmental report, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1997 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  2. Multi-Modal Active Perception for Autonomously Selecting Landing Sites on Icy Moons

    Science.gov (United States)

    Arora, A.; Furlong, P. M.; Wong, U.; Fong, T.; Sukkarieh, S.

    2017-01-01

    Selecting suitable landing sites is fundamental to achieving many mission objectives in planetary robotic lander missions. However, due to sensing limitations, landing sites which are both safe and scientifically valuable often cannot be determined reliably from orbit, particularly, in icy moon missions where orbital sensing data is noisy and incomplete. This paper presents an active perception approach to Entry Descent and Landing (EDL) which enables the lander to autonomously plan informative descent trajectories, acquire high quality sensing data during descent and exploit this additional information to select higher utility landing sites. Our approach consists of two components: probabilistic modeling of landing site features and approximate trajectory planning using a sampling based planner. The proposed framework allows the lander to plan long horizons paths and remain robust to noisy data. Results in simulated environments show large performance improvements over alternative approaches and show promise that our approach has strong potential to improve science return of not only icy moon missions but EDL systems in general.

  3. Final Hanford Site Transuranic (TRU) Waste Characterization Qualit Assurance Project Plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    1999-01-01

    The Transuranic Waste Characterization Quality Assurance Program Plan required each U.S. Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the quality assurance project plan (QAPP)

  4. Basalt Waste Isolation Project exploratory shaft site: Final reclamation report

    International Nuclear Information System (INIS)

    Brandt, C.A.; Rickard, W.H. Jr.

    1990-06-01

    The restoration of areas disturbed by activities of the Basalt Waste Isolation Project (BWIP) constitutes a unique operation at the US Department of Energy's (DOE) Hanford Site, both from the standpoint of restoration objectives and the time frame for accomplishing these objectives. The BWIP reclamation program comprises three separate projects: borehole reclamation, Near Surface Test Facility (NSTF) reclamation, and Exploratory Shaft Facility (ESF) reclamation. The main focus of this report is on determining the success of the revegetation effort 1 year after work was completed. This report also provides a brief overview of the ESF reclamation program. 21 refs., 7 figs., 14 tabs

  5. NASA: Assessments of Selected Large-Scale Projects

    Science.gov (United States)

    2011-03-01

    REPORT DATE MAR 2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE Assessments Of Selected Large-Scale Projects...Volatile EvolutioN MEP Mars Exploration Program MIB Mishap Investigation Board MMRTG Multi Mission Radioisotope Thermoelectric Generator MMS Magnetospheric...probes designed to explore the Martian surface, to satellites equipped with advanced sensors to study the earth , to telescopes intended to explore the

  6. Ground Characterization Studies in Canakkale Pilot Site of LIQUEFACT Project

    Science.gov (United States)

    Ozcep, F.; Oztoprak, S.; Aysal, N.; Bozbey, I.; Tezel, O.; Ozer, C.; Sargin, S.; Bekin, E.; Almasraf, M.; Cengiz Cinku, M.; Ozdemir, K.

    2017-12-01

    The our aim is to outline the ground characterisation studies in Canakkale test site. Study is based on the EU H2020 LIQUEFACT project entitled "Liquefact: Assessment and mitigation of liquefaction potential across Europe: a holistic approach to protect structures / infrastructures for improved resilience to earthquake-induced liquefaction disasters". Objectives and extent of ground characterization for Canakkale test site includes pre-existing soil investigation studies and complementary field studies. There were several SPT and geophysical tests carried out in the study area. Within the context of the complementary tests, six (6) study areas in the test site were chosen and complementary tests were carried out in these areas. In these areas, additional boreholes were opened and SPT tests were performed. It was decided that additional CPT (CPTU and SCPT) and Marchetti Dilatometer (DMT) tests should be carried out within the scope of the complementary testing. Seismic refraction, MASW and micro tremor measurements had been carried out in pre-existing studies. Shear wave velocities obtained from MASW measurements were evaluated to the most rigorous level. These tests were downhole seismic, PS-logging, seismic refraction, 2D-ReMi, MASW, micro tremor (H/V Nakamura method), 2D resistivity and resonance acoustic profiling (RAP). RAP is a new technique which will be explained briefly in the relevant section. Dynamic soil properties had not been measured in pre-existing studies, therefore these properties were investigated within the scope of the complementary tests. Selection of specific experimental tests of the complementary campaign was based on cost-benefit considerations Within the context of complementary field studies, dynamic soil properties were measured using resonant column and cyclic direct shear tests. Several sieve analyses and Atterberg Limits tests which were documented in the pre-existing studies were evaluated. In the complementary study carried out

  7. Enhanced Fuzzy-OWA model for municipal solid waste landfill site selection

    Science.gov (United States)

    Ahmad, Siti Zubaidah; Ahamad, Mohd Sanusi S.; Yusoff, Mohd Suffian; Abujayyab, Sohaib K. M.

    2017-10-01

    In Malaysia, the municipal solid waste landfill site is an essential facility that needs to be evaluated as its demand is infrequently getting higher. The increment of waste generation forces the government to cater the appropriate site for waste disposal. However, the selection process for new landfill sites is a difficult task with regard to land scarcity and time consumption. In addition, the complication will proliferate when there are various criteria to be considered. Therefore, this paper intends to show the significance of the fuzzy logic-ordered weighted average (Fuzzy-OWA) model for the landfill site suitability analysis. The model was developed to generalize the multi-criteria combination that was extended to the GIS applications as part of the decision support module. OWA has the capability to implement different combination operators through the selection of appropriate order weight that is possible in changing the form of aggregation such as minimum, intermediate and maximum types of combination. OWA give six forms of aggregation results that have their specific significance that indirectly evaluates the environmental, physical and socio-economic (EPSE) criteria respectively. Nevertheless, one of the aggregated results has shown similarity with the weighted linear combination (WLC) method.

  8. Safety analysis and hazard classification for the 100-B/C Site Remediation Project, Phase 1. Revision 1

    International Nuclear Information System (INIS)

    Adam, W.J.; Lehrschall, R.R.; Oestreich, D.K.

    1996-07-01

    The purpose of this report is to document the preliminary hazard classification (PHC) for the initial group of sites to be remediated by the 100-B/C Site Remediation Project. The project is targeted at excavation of contaminated solid from seven waste sites, and the transportation and disposal of these wastes at the Environmental Restoration Disposal Facility. The PHC for these remediation activities is rated as radiological

  9. A multi-site study on medical school selection, performance, motivation and engagement

    NARCIS (Netherlands)

    Wouters, A.; Croiset, G.; Schripsema, N. R.; Cohen-Schotanus, J.; Spaai, G. W. G.; Hulsman, R. L.; Kusurkar, R. A.

    Medical schools seek ways to improve their admissions strategies, since the available methods prove to be suboptimal for selecting the best and most motivated students. In this multi-site cross-sectional questionnaire study, we examined the value of (different) selection procedures compared to a

  10. Yucca Mountain Site Characterization Project: Technical data catalog,(quarterly supplement)

    International Nuclear Information System (INIS)

    1993-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year

  11. Bayesian site selection for fast Gaussian process regression

    KAUST Repository

    Pourhabib, Arash; Liang, Faming; Ding, Yu

    2014-01-01

    Gaussian Process (GP) regression is a popular method in the field of machine learning and computer experiment designs; however, its ability to handle large data sets is hindered by the computational difficulty in inverting a large covariance matrix. Likelihood approximation methods were developed as a fast GP approximation, thereby reducing the computation cost of GP regression by utilizing a much smaller set of unobserved latent variables called pseudo points. This article reports a further improvement to the likelihood approximation methods by simultaneously deciding both the number and locations of the pseudo points. The proposed approach is a Bayesian site selection method where both the number and locations of the pseudo inputs are parameters in the model, and the Bayesian model is solved using a reversible jump Markov chain Monte Carlo technique. Through a number of simulated and real data sets, it is demonstrated that with appropriate priors chosen, the Bayesian site selection method can produce a good balance between computation time and prediction accuracy: it is fast enough to handle large data sets that a full GP is unable to handle, and it improves, quite often remarkably, the prediction accuracy, compared with the existing likelihood approximations. © 2014 Taylor and Francis Group, LLC.

  12. Bayesian site selection for fast Gaussian process regression

    KAUST Repository

    Pourhabib, Arash

    2014-02-05

    Gaussian Process (GP) regression is a popular method in the field of machine learning and computer experiment designs; however, its ability to handle large data sets is hindered by the computational difficulty in inverting a large covariance matrix. Likelihood approximation methods were developed as a fast GP approximation, thereby reducing the computation cost of GP regression by utilizing a much smaller set of unobserved latent variables called pseudo points. This article reports a further improvement to the likelihood approximation methods by simultaneously deciding both the number and locations of the pseudo points. The proposed approach is a Bayesian site selection method where both the number and locations of the pseudo inputs are parameters in the model, and the Bayesian model is solved using a reversible jump Markov chain Monte Carlo technique. Through a number of simulated and real data sets, it is demonstrated that with appropriate priors chosen, the Bayesian site selection method can produce a good balance between computation time and prediction accuracy: it is fast enough to handle large data sets that a full GP is unable to handle, and it improves, quite often remarkably, the prediction accuracy, compared with the existing likelihood approximations. © 2014 Taylor and Francis Group, LLC.

  13. COPS model estimates of LLEA availability near selected reactor sites

    International Nuclear Information System (INIS)

    Berkbigler, K.P.

    1979-11-01

    The COPS computer model has been used to estimate local law enforcement agency (LLEA) officer availability in the neighborhood of selected nuclear reactor sites. The results of these analyses are presented both in graphic and tabular form in this report

  14. Assessment of the Nevada Test Site as a Site for Distributed Resource Testing and Project Plan: March 2002

    Energy Technology Data Exchange (ETDEWEB)

    Horgan, S.; Iannucci, J.; Whitaker, C.; Cibulka, L.; Erdman, W.

    2002-05-01

    The objective of this project was to evaluate the Nevada Test Site (NTS) as a location for performing dedicated, in-depth testing of distributed resources (DR) integrated with the electric distribution system. In this large scale testing, it is desired to operate multiple DRs and loads in an actual operating environment, in a series of controlled tests to concentrate on issues of interest to the DR community. This report includes an inventory of existing facilities at NTS, an assessment of site attributes in relation to DR testing requirements, and an evaluation of the feasibility and cost of upgrades to the site that would make it a fully qualified DR testing facility.

  15. Decommissioning project readiness reviews at the Department of Energy's Hanford, Washington, Site

    International Nuclear Information System (INIS)

    Speer, D.R.; Holmes, P.A.

    1987-01-01

    Two Hanford Site contractors independently formulated readiness review methods to prepare for decontamination and decommissioning (D and D) projects. One readiness review method provided an independent management review process. The other method provided a review by personnel directly involved in the project and concise documentation procedures. A unified system is now used at Hanford which combines the best aspects of both readiness review methods. The unified method assigns category levels based on certain job characteristics. The category assigned to the project then indicates the required level of management review prior to proceeding with the D and D project. In addition, the concise documentation procedures are now used for all category levels

  16. GIS and Multicriteria Decision Analysis for Landfill Site Selection in AL-HashimyahQadaa

    OpenAIRE

    Alanbari, Mohammad Ali; Al-Ansari, Nadhir; Jasim, Hadeel Kareem

    2014-01-01

    Waste management system is not well regulated in Iraq. Despite the fact that there are various techniques used for solid waste disposal, landfill is the most common mode for the disposal of solid waste in Iraq, landfill site selection criteria is quite complex process and it depends on several regulation and factors. In this study landfill site selection is performed by using Multicriteria Decision Analysis (MCDA) and Geographic Information System (GIS) for the Al-Hashimyahqadaa. Existing lan...

  17. Feeding-Danger Trade-Offs Underlie Stopover Site Selection by Migrants

    Directory of Open Access Journals (Sweden)

    Andrea C. Pomeroy

    2008-06-01

    Full Text Available To migrate successfully, birds need to store adequate fat reserves to fuel each leg of the journey. Migrants acquire their fuel reserves at stopover sites; this often entails exposure to predators. Therefore, the safety attributes of sites may be as important as the feeding opportunities. Furthermore, site choice might depend on fuel load, with lean birds more willing to accept danger to obtain good feeding. Here, we evaluate the factors underlying stopover-site usage by migrant Western Sandpipers (Calidris mauri on a landscape scale. We measured the food and danger attributes of 17 potential stopover sites in the Strait of Georgia and Puget Sound region. We used logistic regression models to test whether food, safety, or both were best able to predict usage of these sites by Western Sandpipers. Eight of the 17 sites were used by sandpipers on migration. Generally, sites that were high in food and safety were used, whereas sites that were low in food and safety were not. However, dangerous sites were used if there was ample food abundance, and sites with low food abundance were used if they were safe. The model including both food and safety best-predicted site usage by sandpipers. Furthermore, lean sandpipers used the most dangerous sites, whereas heavier birds (which do not need to risk feeding in dangerous locations used safer sites. This study demonstrates that both food and danger attributes are considered by migrant birds when selecting stopover sites, thus both these attributes should be considered to prioritize and manage stopover sites for conservation.

  18. Site selection model for new metro stations based on land use

    Science.gov (United States)

    Zhang, Nan; Chen, Xuewu

    2015-12-01

    Since the construction of metro system generally lags behind the development of urban land use, sites of metro stations should adapt to their surrounding situations, which was rarely discussed by previous research on station layout. This paper proposes a new site selection model to find the best location for a metro station, establishing the indicator system based on land use and combining AHP with entropy weight method to obtain the schemes' ranking. The feasibility and efficiency of this model has been validated by evaluating Nanjing Shengtai Road station and other potential sites.

  19. Selection of remedial alternatives for mine sites: a multicriteria decision analysis approach.

    Science.gov (United States)

    Betrie, Getnet D; Sadiq, Rehan; Morin, Kevin A; Tesfamariam, Solomon

    2013-04-15

    The selection of remedial alternatives for mine sites is a complex task because it involves multiple criteria and often with conflicting objectives. However, an existing framework used to select remedial alternatives lacks multicriteria decision analysis (MCDA) aids and does not consider uncertainty in the selection of alternatives. The objective of this paper is to improve the existing framework by introducing deterministic and probabilistic MCDA methods. The Preference Ranking Organization Method for Enrichment Evaluation (PROMETHEE) methods have been implemented in this study. The MCDA analysis involves processing inputs to the PROMETHEE methods that are identifying the alternatives, defining the criteria, defining the criteria weights using analytical hierarchical process (AHP), defining the probability distribution of criteria weights, and conducting Monte Carlo Simulation (MCS); running the PROMETHEE methods using these inputs; and conducting a sensitivity analysis. A case study was presented to demonstrate the improved framework at a mine site. The results showed that the improved framework provides a reliable way of selecting remedial alternatives as well as quantifying the impact of different criteria on selecting alternatives. Copyright © 2013 Elsevier Ltd. All rights reserved.

  20. Safety assessment input for site selection - the Swedish example - 59031

    International Nuclear Information System (INIS)

    Andersson, Johan

    2012-01-01

    Svensk Kaernbraenslehantering AB (SKB) has performed comprehensive investigations of two candidate sites for a final repository for Sweden's spent nuclear fuel. In March 2011 SKB decided to submit licence applications for a final repository at Forsmark. Before selection, SKB stated that the site that offers the best prospects for achieving long-term safety in practice would be selected. Based on experiences previous safety assessments, a number of issues related to long-term safety need to be considered in the context of site comparison. The factors include sensitivity to climate change such as periods of permafrost and glaciations, rock mechanics evolution including the potential for thermally induced spalling and sensitivity to potential future earthquakes, current and future groundwater flow, evolution of groundwater composition and proximity to mineral resources. Each of these factors related to long-term safety for the two candidate sites is assessed in a comparative analysis of site characteristics. The assessment also considers differences in biosphere conditions and in the confidence of the site descriptions. The comparison is concluded by an assessment on how the identified differences would affect the estimated radiological risk from a repository located at either of the sites. The assessment concludes that there are a number of safety related site characteristics for which the analyses do not show any decisive differences in terms of implications on safety, between the sites Forsmark and Laxemar. However, the frequency of water conducting fractures at repository depth is much smaller at Forsmark than at Laxemar. This difference, in turn, affects the future stability of the current favourable groundwater composition, which combined with the much higher flows at Laxemar would, for the current repository design, lead to a breach in the safety functions for the buffer and the canister for many more deposition positions at Laxemar than at Forsmark. Thereby

  1. The search for a storage site for low-level and long-life wastes. A national project and a development opportunity for your town. A dossier for local communities

    International Nuclear Information System (INIS)

    2008-01-01

    After a review of the program schedule, this document presents the project of a storage site for low-level and long life radioactive wastes as an opportunity for a district: it outlines the benefits of such a realisation for the dynamics of the local activity, specifies the main economical and financial characteristics associated with such a facility, and evokes the elements which are taken into account for the selection of the site. It describes the storage centre as a place of industrial activity, a monitored and controlled facility, an installation opened to the public. It describes the different stages of the life cycle of this future storage centre: pre-selection, on-site investigations, additional studies and administrative process for the selected site, building and starting, operation, shutting down, surveillance. The document indicates the legal frame related to this activity, specifies what are the different concerned wastes, and their present warehousing locations. It gives some details on the different safety principles for such a storage: environment and health protection, geological layer, public works engineering solutions, waste packages

  2. Site-Selective Conjugation of Native Proteins with DNA

    DEFF Research Database (Denmark)

    Trads, Julie Brender; Tørring, Thomas; Gothelf, Kurt Vesterager

    2017-01-01

    Conjugation of DNA to proteins is increasingly used in academia and industry to provide proteins with tags for identification or handles for hybridization to other DNA strands. Assay technologies such as immuno-PCR and proximity ligation and the imaging technology DNA-PAINT require DNA-protein....... The introduction of a bioorthogonal handle at a specific position of a protein by recombinant techniques provides an excellent approach to site-specific conjugation, but for many laboratories and for applications where several proteins are to be labeled, the expression of recombinant proteins may be cumbersome...... conjugates. In DNA nanotechnology, the DNA handle is exploited to precisely position proteins by self-assembly. For these applications, site-selective conjugation is almost always desired because fully functional proteins are required to maintain the specificity of antibodies and the activity of enzymes...

  3. Retroviral DNA integration: viral and cellular determinants of target-site selection.

    Directory of Open Access Journals (Sweden)

    Mary K Lewinski

    2006-06-01

    Full Text Available Retroviruses differ in their preferences for sites for viral DNA integration in the chromosomes of infected cells. Human immunodeficiency virus (HIV integrates preferentially within active transcription units, whereas murine leukemia virus (MLV integrates preferentially near transcription start sites and CpG islands. We investigated the viral determinants of integration-site selection using HIV chimeras with MLV genes substituted for their HIV counterparts. We found that transferring the MLV integrase (IN coding region into HIV (to make HIVmIN caused the hybrid to integrate with a specificity close to that of MLV. Addition of MLV gag (to make HIVmGagmIN further increased the similarity of target-site selection to that of MLV. A chimeric virus with MLV Gag only (HIVmGag displayed targeting preferences different from that of both HIV and MLV, further implicating Gag proteins in targeting as well as IN. We also report a genome-wide analysis indicating that MLV, but not HIV, favors integration near DNase I-hypersensitive sites (i.e., +/- 1 kb, and that HIVmIN and HIVmGagmIN also favored integration near these features. These findings reveal that IN is the principal viral determinant of integration specificity; they also reveal a new role for Gag-derived proteins, and strengthen models for integration targeting based on tethering of viral IN proteins to host proteins.

  4. Engineering study of generic site criteria for selected DOE plutonium facilities

    International Nuclear Information System (INIS)

    Kingsbury, R.J.; Greenwood, J.M.; Sandoval, M.D.

    1980-09-01

    The objectives of this study were to identify criteria that would be applied to selection of a site for plutonium facilities such as those at the Rocky Flats Plant, to establish the relative importance of these criteria, and to identify suitable areas within the United States for location of plutonium facilities with respect to these criteria. Sources of the site criteria identified include federal laws, federal agency regulations, state laws and regulations, and requirements associated with operations to be performed at the site. The criteria identified during the study were organized into 14 major categories. The relative importnace of each category and each criterion within the categories were established using group decision-making techniques. The major criteria categories, their assigned weight on a scale of 1 to 10, and their relative priority ranks are as follows: geology/seismicity; public safety; environmental impact; meteorology; hydrology; topography; transportation; utilities; personnel; safeguards/security; land area and availability; land use compatibility; and, public acceptance. A suitability analysis of the continental United States was performed using only those criteria that could be mapped at a national scale. Suitability was assessed with respect to each of these criteria, and individual suitability maps were prepared. A composite suitability map was generated using computerized overlay techniques. This map provides a starting point for identifying specific candidate sites if an actual site selection were to be conducted

  5. Maternal and individual effects in selection of bed sites and their consequences for fawn survival at different spatial scales.

    Science.gov (United States)

    Van Moorter, Bram; Gaillard, Jean-Michel; McLoughlin, Philip D; Delorme, Daniel; Klein, François; Boyce, Mark S

    2009-03-01

    We examined the relationship between survival of roe deer (Capreolus capreolus) fawns at Trois Fontaines, Champagne-Ardennes, France, and factors related to bed-site selection (predator avoidance and thermoregulation) and maternal food resources (forage availability in the maternal home range). Previous studies have demonstrated that at small scales, the young of large herbivores select bed sites independently from their mothers, although this selection takes place within the limits of their mother's home range. Fawn survival was influenced largely by the availability of good bed sites within the maternal home range, not by the fawn's selection of bed sites; however, selection for thermal cover when selecting bed sites positively influenced survival of young fawns. Typical features of a good home range included close proximity to habitat edges, which is related to forage accessibility for roe deer. The availability of bed sites changed as fawns aged, probably due to an increased mobility of the fawn or a different use of the home range by the mother; sites offering high concealment and thermal protection became less available in favor of areas with higher forage accessibility. Despite the minor influence of bed-site selection on survival, roe deer fawns strongly selected their bed sites according to several environmental factors linked to predator avoidance and thermoregulation. Fawns selected for sites providing concealment, light penetration, and avoided signs of wild boar (Sus scrofa) activity. Avoidance of sites with high light penetration by young fawns positively affected their survival, confirming a negative effect on thermoregulation due to reduced thermal cover. Selection for light penetration by older fawns was less clear. We discuss these results in the context of cross-generational effects in habitat selection across multiple scales, and the potential influence of the 'ghost of predation past'.

  6. Mitigation and monitoring plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado

    International Nuclear Information System (INIS)

    1992-06-01

    The U.S Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project. The UMTRA Project is the result of the Uranium Mill Tailings Radiation Control Act(UMTRA) which was passed in response to the public's concern over the potential public health hazards related to uranium mill tailings and associated contaminated material at abandoned or otherwise uncontrolled inactive processing sites throughout the United States. The Gunnison, Colorado abandoned uranium mill site is one of the sites slated for cleanup by the DOE under authority of UMTRA. The contaminated material at this site will be transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities will temporarily disturb 0.8 acre and permanently eliminate 5.1 acres of wetlands. This report describes the proposed mitigation plan for the 5.9 acres of impacted wetlands. In conjunction with the mitigation of the permanently impacted wetlands through the enhancement of wetland and adjacent riparian areas, impacts to wildlife as a result of this project will also be mitigated. However, wildlife mitigation is not the focus of this document and is covered in relevant BLM permits for this project. This plan proposes the enhancement of a 3:1 ratio of impacted wetlands in accordance with US Environmental Protection Agency guidelines, plus the enhancement of riparian areas for wildlife mitigation. Included in this mitigation plan is a monitoring plan to ensure that the proposed measures are working and being maintained

  7. The site selection law and the anti-atom movement

    International Nuclear Information System (INIS)

    Haefner, Daniel

    2015-01-01

    The anti atom movement has reached many of their political claims with the German nuclear power phaseout. At the same time the government has regained the interpretive dominance with the in radioactive waste management with the new search for possible final repository sites. He anti-atom movement refuses most parts of the actual law but cannot abdicate from the responsibility of the process of site selection. The contribution shows using three actual research approaches that such a convergence is probable to occur in the future. A cooperation of anti-atom movement and the government is of high probability in the long term, but is not necessarily identical to a political acceptance.

  8. Site-selective three-component reaction for dual-functionalization of peptides

    DEFF Research Database (Denmark)

    Munch, Henrik Kofoed; Rasmussen, Jakob Ewald; Popa, Gina

    2013-01-01

    A site-selective dual-functionalization of peptides is presented, involving readily available maleimides as well as N-hydroxylamines. The modification proceeds through a three component 1,3-dipolar cycloaddition, forming a stable product. This was exemplified by the one-pot attachment of two...

  9. Site selection and evaluation of nuclear power units in Egypt

    International Nuclear Information System (INIS)

    Bonnefille, R.

    1980-01-01

    The selection of sites for nuclear power units in Egypt by SOFRATOME for Nuclear Plants Authority is carried on using a method based on interaction between different criteria. The method and the main results on criterion 'radio-ecological impact' are sketched briefly [fr

  10. The ENTRIA project. Selected disciplinary and interdisciplinary research topics; Das ENTRIA-Projekt. Ausgewaehlte disziplinaere und interdisziplinaere Forschungsthemen

    Energy Technology Data Exchange (ETDEWEB)

    Roehlig, Klaus-Juergen [Technical Univ. Clausthal, Clausthal-Zellerfeld (Germany); Hocke, Peter [KIT Karlsruhe (Germany). Inst. for Technology Assessment and Systems Analysis; Smeddinck, Ulrich [Braunschweig Technical Univ. Braunschweig (Germany); Walther, Clemens [Hannover Univ. (Germany). Inst. for Radioecology and Radiation Protection

    2015-07-01

    ENTRIA (''Disposal Options for Radioactive Residues: Interdisciplinary Analyses and Development of Evaluation Principles'', www.entria.de) is a joint research project carried out by twelve departments and institutes from German universities and major research institutions and one partner from Switzerland. It is financed by the German Ministry of Education and Research (BMBF). Scientists representing natural sciences, civil engineering, philosophy, law, social and political sciences, and technology assessment carry out disciplinary and interdisciplinary research addressing three options to manage especially high-level radioactive waste: - Final disposal in deep geological formations without any arrangements for retrieval, - disposal in deep geological formations with arrangements for monitoring and retrieval, and - (prolonged) surface (or near-surface) storage. In the paper, the following selected research topics - both disciplinary and interdisciplinary - are briefly introduced in order to provide an impression of the project scope: - Surface storage, - reference concepts for emplacement in deep geological formations with retrievability and monitoring, - radiation exposure and justification of measures, - interdisciplinary perspectives on dose limits, - comparative studies on nuclear waste governance, - nuclear waste governance in Switzerland, - public involvement and the German Site Selection Act, and - citizens' jury.

  11. The importance of environmental quality and catch potential to fishing site selection by freshwater anglers in Mississippi

    Science.gov (United States)

    Schramm, H.L.; Gerard, P.D.; Gill, D.A.

    2003-01-01

    We measured the importance of 24 fishing site attributes to Mississippi freshwater anglers. Factor analysis identified four multiattribute factors as important in the selection of fishing location: CLEAN ENVIRONMENT CATCH, COST AND HARVEST and AMENITIES AND SAFETY. In general, the importance of site selection factors differed little among anglers grouped by preferred type of fish, preferred fishing location (lakes and reservoirs, rivers and streams, ponds, or reservoir tailwaters), usual manner of fishing (engine-powered boat, nonpowered boat, or shore), or change in fishing frequency. COST AND HARVEST was more important to anglers with high harvest orientations. We found low correlations between site selection factor importance scores and angler age, fishing frequency, fishing expenditures, or fishing motivation factors. We suggest that the general lack of differences in site selection factors among angler groups indicates that management strategies to improve fishing site attributes should benefit all angler groups. Clean fishing environments and awareness of the availability of desired sport fishes were "very" or "extremely" important to fishing site selection by more than 70% of Mississippi freshwater anglers and should be priority management objectives.

  12. Single site porphyrine-like structures advantages over metals for selective electrochemical CO2 reduction

    DEFF Research Database (Denmark)

    Bagger, Alexander; Ju, Wen; Varela, Ana Sofia

    2017-01-01

    Currently, no catalysts are completely selective for the electrochemical CO2 Reduction Reaction (CO2RR). Based on trends in density functional theory calculations of reaction intermediates we find that the single metal site in a porphyrine-like structure has a simple advantage of limiting...... the competing Hydrogen Evolution Reaction (HER). The single metal site in a porphyrine-like structure requires an ontop site binding of hydrogen, compared to the hollow site binding of hydrogen on a metal catalyst surface. The difference in binding site structure gives a fundamental energy-shift in the scaling...... relation of ∼0.3eV between the COOH* vs. H* intermediate (CO2RR vs. HER). As a result, porphyrine-like catalysts have the advantage over metal catalyst of suppressing HER and enhancing CO2RR selectivity....

  13. Site suitability, selection and characterization: Branch technical position--Low-Level Waste Licensing Branch

    International Nuclear Information System (INIS)

    Siefken, D.; Pangburn, G.; Pennifill, R.; Starmer, R.J.

    1982-04-01

    The staff provides an expanded interpretation of the site suitability requirements in the proposed rule 10 CFR Part 61, a description of the anticipated site selection process, and a detailed discussion of the site characterization program needed to support a license application and environmental report. The paper provides early-on guidance to prospective applicants in these three subject areas

  14. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1995 quality program status report

    Energy Technology Data Exchange (ETDEWEB)

    Bolivar, S.L.

    1996-07-01

    This status report summarizes the activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project`s (YMP`s) quality assurance program for January 1 to September 30, 1995. The report includes major sections on program activities and trend analysis.

  15. Communication: Site-selective bond excision of adenine upon electron transfer

    Science.gov (United States)

    Cunha, T.; Mendes, M.; Ferreira da Silva, F.; Eden, S.; García, G.; Limão-Vieira, P.

    2018-01-01

    This work demonstrates that selective excision of hydrogen atoms at a particular site of the DNA base adenine can be achieved in collisions with electronegative atoms by controlling the impact energy. The result is based on analysing the time-of-flight mass spectra yields of potassium collisions with a series of labeled adenine derivatives. The production of dehydrogenated parent anions is consistent with neutral H loss either from selective breaking of C-H or N-H bonds. These unprecedented results open up a new methodology in charge transfer collisions that can initiate selective reactivity as a key process in chemical reactions that are dominant in different areas of science and technology.

  16. How Do Contractors Select Suppliers for Greener Construction Projects? The Case of Three Swedish Companies

    Directory of Open Access Journals (Sweden)

    Shahin Mokhlesian

    2014-06-01

    Full Text Available There are many studies of contractor selection based on clients and the selection of suppliers by contractors. However, supplier selection specifically related to green construction projects has been much less studied. Green construction differs from conventional construction because of differences in its underlying principles and use of environmentally-friendly materials and technologies. This paper studies how procurers in contractor companies in Sweden adopt green projects and how contractor perception of supplier mastery of green knowledge affects supplier selection. The investigation is based on a set of semi-structured interviews conducted among three large contractors in Sweden. A main finding is that the perceived differences between green and conventional projects do not change supplier selection dramatically. An implication is that “greener projects” is a more appropriate denotation than “green project”. Evidence shows that suppliers’ green knowledge is an important factor in supplier selection, as respondents rated suppliers’ knowledge of green projects as very important, and to fix his, there was a consensus among respondents about the need for close collaboration between contractors and suppliers. To ensure knowledge acquisition from suppliers and to increase their competitive advantage over rivals, contractors collaborate with their suppliers in a partnering setting. It is anticipated that the results of this study will be used to fill the gap in the literature on supplier selection in green projects and can also be used for construction firms contemplating getting involved in green projects.

  17. U.S. Department of Energy Grand Junction Projects Office site environmental report for calendar year 1995

    International Nuclear Information System (INIS)

    1996-05-01

    This report presents information pertaining to environmental activities conducted during calendar year 1995 at the US Department of Energy (DOE) Grand Junction Projects Office (GJPO) facility in Grand Junction, Colorado. Environmental activities conducted at the GJPO facility during 1995 were associated with mixed-waste treatment, site remediation, off-site dose modeling, and radiological and nonradiological monitoring. As part of the GJPO Mixed-Waste Treatment Program, on-site treatability studies were conducted in 1995 that made use of pilot-scale evaporative-oxidation and thermal-desorption units and bench-scale stabilization. DOE-GJPO used some of its own mixed-waste as well as samples received from other DOE sites for these treatability studies. These studies are expected to conclude in 1996. Removal of radiologically contaminated materials from GJPO facility buildings was conducted under the provisions of the Grand Junction Projects Office Remedial Action Project. Remediation activities included the removal of 394 metric tons of contaminated material from Buildings 18 and 28 and revegetation activities on the GJPO site; remediation was conducted in compliance with applicable permits

  18. Seeing the forest through the trees: Considering roost-site selection at multiple spatial scales

    Science.gov (United States)

    Jachowski, David S.; Rota, Christopher T.; Dobony, Christopher A.; Ford, W. Mark; Edwards, John W.

    2016-01-01

    Conservation of bat species is one of the most daunting wildlife conservation challenges in North America, requiring detailed knowledge about their ecology to guide conservation efforts. Outside of the hibernating season, bats in temperate forest environments spend their diurnal time in day-roosts. In addition to simple shelter, summer roost availability is as critical as maternity sites and maintaining social group contact. To date, a major focus of bat conservation has concentrated on conserving individual roost sites, with comparatively less focus on the role that broader habitat conditions contribute towards roost-site selection. We evaluated roost-site selection by a northern population of federally-endangered Indiana bats (Myotis sodalis) at Fort Drum Military Installation in New York, USA at three different spatial scales: landscape, forest stand, and individual tree level. During 2007–2011, we radiotracked 33 Indiana bats (10 males, 23 females) and located 348 roosting events in 116 unique roost trees. At the landscape scale, bat roost-site selection was positively associated with northern mixed forest, increased slope, and greater distance from human development. At the stand scale, we observed subtle differences in roost site selection based on sex and season, but roost selection was generally positively associated with larger stands with a higher basal area, larger tree diameter, and a greater sugar maple (Acer saccharum) component. We observed no distinct trends of roosts being near high-quality foraging areas of water and forest edges. At the tree scale, roosts were typically in American elm (Ulmus americana) or sugar maple of large diameter (>30 cm) of moderate decay with loose bark. Collectively, our results highlight the importance of considering day roost needs simultaneously across multiple spatial scales. Size and decay class of individual roosts are key ecological attributes for the Indiana bat, however, larger-scale stand structural

  19. Fusion facility siting considerations

    International Nuclear Information System (INIS)

    Bussell, G.T.

    1985-01-01

    Inherent in the fusion program's transition from hydrogen devices to commercial power machines is a general increase in the size and scope of succeeding projects. This growth will lead to increased emphasis on safety, environmental impact, and the external effects of fusion in general, and of each new device in particular. A critically important consideration in this regard is site selection. The purpose of this paper is to examine major siting issues that may affect the economics, safety, and environmental impact of fusion

  20. Enhancing Effectiveness of EMSP Projects Through Strong Connections to Site Problems

    International Nuclear Information System (INIS)

    Guillen, D. P.; Josephson, G. B.

    2002-01-01

    The Environmental Management Science Program (EMSP) funds basic science research that will lead to reduced remediation cost, schedule, technical uncertainties, and risk for DOE's environmental clean up. The Tanks Focus Area (TFA) has partnered with EMSP to accomplish those same objectives for DOE's largest and most expensive remediation effort--to retrieve and immobilize the highly radioactive wastes that are our nation's chief nuclear defense program legacy. TFA has been tasked to facilitate success of the EMSP investment. The key for EMSP projects to contribute to this remediation effort is communication. First, scientists need to understand much more about how their scientific results would be used than they could ever learn from the original EMSP solicitation or by reading the referenced DOE needs statements. Second, the scientists' results must be communicated to the site problem holders in a usable form and in a timely manner such that important information gaps can still be filled by the EMSP project. Research results can be used in a variety of ways besides deployment of new hardware or a new process. When results are USED the site problem holders become ''users''. The important aspect that research results are to be used is captured in the TFA lexicon for their clients, the DOE sites--''users''. This paper will show, through several examples, significant contributions EMSP scientists have made to solving DOE's high-level waste challenges through direct and enhanced communication with TFA and site users

  1. Site selection for disposal of nuclear waste - on what grounds? A report from hearings at the Council June 4-5 2008

    International Nuclear Information System (INIS)

    2009-01-01

    As part of the Nuclear Waste Council's own knowledge-building on site selection, the Council organized a hearing on the what grounds site selection will be made. The public hearing, had several objectives: to contribute to knowledge building on site selection for Nuclear Waste Council and other actors, to contribute to an improved basis for site selection by clarifying the factors and values of importance, to clarify the different actors' expectations SKB's future accounting, to highlight how to deal with different aspects (safety, geological, environmental, infrastructural, socio-economic and democratic) instruments for site selection, and to identify operators of critical issues. The report is divided into the following sections: The Government's View on the upcoming Site Selection; the Site Selection Process, The View of the Local Communities on the Site Selection; the Current Status of the Selection Process, SKB's plans, the Site-Selection Factors; he Authorities' perspective; the Environmental Organizations perspective; Reflections of the Council on the Hearings; Discussion and Analysis of Key Issues related to Groundwater Flow, Final Discussion

  2. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    Science.gov (United States)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of

  3. WEST VALLEY DEMONSTRATION PROJECT ANNUAL SITE ENVIRONMENTAL REPORT CALENDAR YEAR 2002

    International Nuclear Information System (INIS)

    2003-01-01

    This annual environmental monitoring report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2002 environmental monitoring data so as to describe the performance of the WVDP's environmental management system, confirm compliance with standards and regulations, and highlight important programs. In 2002, the West Valley Demonstration Project, the site of a DOE environmental cleanup activity operated by West Valley Nuclear Services Co. (WVNSCO), was in the final stages of stabilizing high-level radioactive waste (HLW) that remained at the site after commercial nuclear fuel reprocessing had been discontinued in the early 1970s. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority (NYSERDA). Ongoing work activities at the WVDP during 2002 included: (1) completing HLW solidification and melter shutdown; (2) shipping low-level radioactive waste off-site for disposal; (3) constructing a facility where large high-activity components can be safely packaged for disposal; (4) packaging and removing spent materials from the vitrification facility; (5) preparing environmental impact statements for future activities; (6) removing as much of the waste left behind in waste tanks 8D-1 and 8D-2 as was reasonably possible; (7) removing storage racks, canisters, and debris from the fuel receiving and storage pool, decontaminating pool walls, and beginning shipment of debris for disposal; (8) ongoing decontamination in the general purpose cell and the process mechanical cell (also referred to as the head end cells); (9) planning

  4. WEST VALLEY DEMONSTRATION PROJECT ANNUAL SITE ENVIRONMENTAL REPORT CALENDAR YEAR 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-09-12

    This annual environmental monitoring report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2002 environmental monitoring data so as to describe the performance of the WVDP's environmental management system, confirm compliance with standards and regulations, and highlight important programs. In 2002, the West Valley Demonstration Project, the site of a DOE environmental cleanup activity operated by West Valley Nuclear Services Co. (WVNSCO), was in the final stages of stabilizing high-level radioactive waste (HLW) that remained at the site after commercial nuclear fuel reprocessing had been discontinued in the early 1970s. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority (NYSERDA). Ongoing work activities at the WVDP during 2002 included: (1) completing HLW solidification and melter shutdown; (2) shipping low-level radioactive waste off-site for disposal; (3) constructing a facility where large high-activity components can be safely packaged for disposal; (4) packaging and removing spent materials from the vitrification facility; (5) preparing environmental impact statements for future activities; (6) removing as much of the waste left behind in waste tanks 8D-1 and 8D-2 as was reasonably possible; (7) removing storage racks, canisters, and debris from the fuel receiving and storage pool, decontaminating pool walls, and beginning shipment of debris for disposal; (8) ongoing decontamination in the general purpose cell and the process mechanical cell (also referred to as the head end cells); (9

  5. Parameter selection for the SSC trade-offs and optimization

    International Nuclear Information System (INIS)

    Edwards, D.A.; Syphers, M.J.

    1991-01-01

    In November of 1988, a site was selected in the state of Texas for the SSC. In January of 1989, the SSC Laboratory was established in Texas to adapt the design of the collider to the site and to manage the construction of the project. This paper describes the evolution of the SSC design since site selection, notes the increased concentration on the injector system, and addresses the rationale for choice of parameters

  6. Role of mine ventilation in site selection for a nuclear waste repository

    International Nuclear Information System (INIS)

    McPherson, M.J.

    1984-01-01

    The application of mine ventilation practice and theory to the measurement of groundwater flow for the purpose of the selection of sites for underground storage of nuclear spent fuel is described. The discipline of mine ventilation has an important part to play not only in the design and operation of an underground nuclear waste repository but also during the early stages of potential site characterization. One of the most vital factors in the selection of a suitable site is the rate at which groundwater can flow through the native rock. The effects of repository heat on groundwater migration are highlighted and a description of a major experiment in an underground test site is included. Detailed monitoring of airflow and its psychrometric properties enabled quantification of very low rates of water seepage into an isolated heading. The results indicated the relationship between permeability of a fractured rock and temperature. The transient phenomena that govern evaporation of water from fissured rock surfaces in the test chamber are also examined. (author)

  7. In Situ Thermal NAPL Remediation at the Northeast Site Pinellas Environmental Restoration Project

    International Nuclear Information System (INIS)

    Juhlin, R.; Butherus, M.

    2006-01-01

    The U.S. Department of Energy (DOE) is conducting thermal remediation to remove non-aqueous phase liquids (NAPLs) from the subsurface at the Northeast Site that is part of the Pinellas Environmental Restoration Project. The Northeast Site is located on the Young - Rainey Science, Technology, and Research (STAR) Center in Largo, Florida. The STAR Center was formerly a DOE facility. The NAPL remediation was performed at Area A and is currently being performed at Area B at the Northeast Site. The remediation at Area A was completed in 2003 and covered an area of 900 m 2 (10,000 ft 2 ) and a depth of remediation that extended to 10.7 m (35 ft) below ground surface. Cleanup levels achieved were at or below maximum contaminant levels in almost all locations. The remediation project at Area B is ongoing and covers an area of 3,240 m 2 (36,000 ft 2 ), a volume of 41,300 m (54,000 yd 3), and a depth of remediation to 12 m (40 ft) below ground surface. In addition, a portion of the subsurface under an occupied building in Area B is included in the remediation. The cleanup levels achieved from this remediation will be available in the Area B Final Report that will be posted on the DOE Office of Legacy Management web site (www.lm.doe.gov/land/sites/fl/ pinellas/pinellas.htm) in January 2007. Electrical resistive heating and steam were the chosen remediation methods at both areas. Lessons learned from the Area A remediation were incorporated into the Area B remediation and could benefit managers of similar remediation projects. (authors)

  8. Site observational work plan for the UMTRA project site at Falls City, Texas

    International Nuclear Information System (INIS)

    1994-09-01

    During surface remedial action, an estimated 7.0 million tons (6.4 million tonnes) of uranium mill tailings and other contaminated materials were consolidated and stabilized on the Falls City site. The ground water protection strategy at the Falls City disposal site for the UMTRA Surface Project (Subpart A of 40 CFR Part 192 (1994)) was an application for supplemental standards, based on Class III (limited use) ground water in the uppermost aquifer. This water is not a current or potential source of drinking water. Ground water from the uppermost aquifer (ground water from the Deweesville/Conquista Members and the Dilworth Member) contains widespread ambient contamination resulting from naturally occurring conditions and from the effects of human activity not related to uranium milling operations (uranium exploration and mining activities). The ground water cannot be effectively cleaned up for drinking or other beneficial purposes using treatment methods reasonably employed by public water supply systems. The U.S. Nuclear Regulatory Commission (NRC) and the state of Texas concurred with the ground water protection strategy for the disposal site in September 1992. Surface remedial action in accord with Subpart A was completed in April 1994. The proposed ground water compliance strategy (Subpart B of 40 CFR Part 192 (1994)) at the Falls City site is to perform no remedial action based on application for supplemental standards because the ground water in the uppermost aquifer is classified as Class III ground water. Class III ground water includes ground water that is not a current or potential source of drinking water because of widespread, ambient contamination that cannot be cleaned up using treatment methods reasonably employed by public water supply systems (40 CFR section 192.11 (e) (1994)). Although supplemental standards are being applied, the potential use of ground water in the site vicinity will be protected

  9. Site characterization report for the basalt waste isolation project. Volume III

    International Nuclear Information System (INIS)

    1982-11-01

    The reference location for a repository in basalt for the terminal storage of nuclear wastes on the Hanford Site and the candidate horizons within this reference repository location have been identified and the preliminary characterization work in support of the site screening process has been completed. Fifteen technical questions regarding the qualification of the site were identified to be addressed during the detailed site characterization phase of the US Department of Energy-National Waste Terminal Storage Program site selection process. Resolution of these questions will be provided in the final site characterization progress report, currently planned to be issued in 1987, and in the safety analysis report to be submitted with the License Application. The additional information needed to resolve these questions and the plans for obtaining the information have been identified. This Site Characterization Report documents the results of the site screening process, the preliminary site characterization data, the technical issues that need to be addressed, and the plans for resolving these issues. Volume 3 contains chapters 13 through 19: site issues and plans; geoengineering and repository design issues and plans; waste package and site geochemistry issues and plans; performance-assessment issues and plans; site characterization program; quality assurance; and identification of alternate sites

  10. Demands and criteria for the site selection from the view of the power plant owners

    International Nuclear Information System (INIS)

    Staebler, K.; Beising, R.

    1975-01-01

    Function of electricity supply utilities from the point of view of choice of site; energy business background; references to the mode of procedure in site selection; pragmatic principle of site choice. (HP) [de

  11. Towards canine rabies elimination: Economic comparisons of three project sites.

    Science.gov (United States)

    Elser, J L; Hatch, B G; Taylor, L H; Nel, L H; Shwiff, S A

    2018-02-01

    An appreciation of the costs of implementing canine rabies control in different settings is important for those planning new or expanded interventions. Here we compare the costs of three canine rabies control projects in South Africa, the Philippines and Tanzania to identify factors that influence the overall costs of rabies control efforts. There was considerable variation in the cost of vaccinating each dog, but across the sites these were lower where population density was higher, and later in the projects when dog vaccination coverage was increased. Transportation costs comprised a much higher proportion of total costs in rural areas and where house-to-house vaccination campaigns were necessary. The association between the cost of providing PEP and human population density was less clear. The presence of a pre-existing national rabies management programme had a marked effect on keeping infrastructure and equipment costs for the project low. Finally, the proportion of the total costs of the project provided by the external donor was found to be low for the projects in the Philippines and South Africa, but likely covered close to the complete costs of the project in Tanzania. The detailed economic evaluation of three recent large-scale rabies control pilot projects provides the opportunity to examine economic costs across these different settings and to identify factors influencing rabies control costs that could be applied to future projects. Published 2017. This article is a U.S. Government work and is in the public domain in the USA.

  12. Site remediation using biological processes

    International Nuclear Information System (INIS)

    Lei, J.; Sansregret, J.L.; Cyr, B.; Pouliot, Y.

    1995-01-01

    The main process used in the bioremediation of contaminated sites is the microbial degradation and mineralization of pollutants. The bioengineering processes developed and applied by the company to optimize the microbial degradation are described and full scale case studies are reviewed. In each case, the site characteristics (type of contaminants, nature of soil, geographic location, etc.) and the results obtained are presented. The selected projects cover different bioremediation techniques (biopile, bioventing and air sparging), different contaminants (PAH, PCP, hydrocarbons) and different types of industrial sites (former gas work plant, petroleum depot, refinery, etc.)

  13. Linking Eco-Energetics and Eco-Hydrology to Select Sites for the Assisted Colonization of Australia’s Rarest Reptile

    Directory of Open Access Journals (Sweden)

    Nicola Mitchell

    2012-12-01

    Full Text Available Assisted colonization—the deliberate translocation of species from unsuitable to suitable regions—is a controversial management tool that aims to prevent the extinction of populations that are unable to migrate in response to climate change or to survive in situ. The identification of suitable translocation sites is therefore a pressing issue. Correlative species distribution models, which are based on occurrence data, are of limited use for site selection for species with historically restricted distributions. In contrast, mechanistic species distribution models hold considerable promise in selecting translocation sites. Here we integrate ecoenergetic and hydrological models to assess the longer-term suitability of the current habitat of one of the world’s rarest chelonians, the Critically Endangered Western Swamp Tortoise (Psuedemydura umbrina. Our coupled model allows us to understand the interaction between thermal and hydric constraints on the foraging window of tortoises, based on hydrological projections of its current habitat. The process can then be repeated across a range of future climates to identify regions that would fall within the tortoise’s thermodynamic niche. The predictions indicate that climate change will result in reduced hydroperiods for the tortoises. However, under some climate change scenarios, habitat suitability may remain stable or even improve due to increases in the heat budget. We discuss how our predictions can be integrated with energy budget models that can capture the consequences of these biophysical constraints on growth, reproduction and body condition.

  14. Site Response Analysis Using DeepSoil: Case Study of Bangka Site, Indonesia

    Energy Technology Data Exchange (ETDEWEB)

    Iswanto, Eko Rudi; Yee, Eric [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2015-10-15

    Indonesia government declared through Act No. 17 year 2007 on the National Long-Term Development Plant Year 2005-2025 and Presidential Decree No. 5 year 2006 on the National Energy Policy (Indonesia 2007; Indonesia 2006), that nuclear energy is stated as a part of the national energy system. In order to undertake the above national policy, National Nuclear Energy Agency of Indonesia, as the promotor for the utilization of nuclear energy will conduct site study, which is a part of infrastructure preparation for NPP construction. Thorough preparation and steps are needed to operate an NPP and it takes between 10 to 15 years from the preliminary study (site selection, financial study, etc.) up to project implementation (manufacturing, construction, commissioning). During project implementation, it is necessary to prepare various documents relevant for permit application such as Safety Evaluation Report for site permit, Preliminary Safety Analysis Report and Environment Impact Assessment Report for construction permit. Considering the continuously increasing electricity energy demand, it is necessary to prepare for alternative NPP sites. The safety requirements of NPP's are stringent; amongst the various requirements is the ability to safely shut down in the wake of a possible earthquake. Ground response analysis of a potential site therefore needs to be carried out, parameter that affect the resistance of an NPP to earthquakes such as peak strain profiles is analysed. The objective of this paper is to analyse the ground response of the selected site for a NPP, using The Mw 7.9 in Sikuai Island, West Sumatra on September 12, 2007 as present input motion. This analysis will be carried out using a ground response analysis program, DeepSoil. In addition to this, an attempt was made to define the site specific input motion characteristics of the selected site for use in DeepSoil (DeepSoil 5.0). A site investigation at the WB site was performed primarily on the PS

  15. Project Selection and Transparency Factors in Housing Public-Private Partnerships in Nigeria

    Directory of Open Access Journals (Sweden)

    Eziyi Offia Ibem

    2018-06-01

    Full Text Available The application of Public-Private Partners (PPPs in housing provisioning is on the increase across the world. However, there is a paucity of empirical studies on the specific factors considered at the initiation, and measures taken to ensure transparency at the procurement stages, of PPP housing projects. This study examined project selection factors and transparency measures in PPP housing projects using data sourced from oral interviews with 27 experts in nine PPP housing schemes in Nigeria. Results of the content analysis revealed that the top two selection factors considered by both the public and private sector operators of PPP housing projects in Nigeria are the availability of land and viability of the funding arrangements. Whereas the public-sector partners also consider the availability of competent private sector to deliver the projects, the private developers are concerned with the location of proposed projects. It was also found that the two key measures taken to ensure transparency at the procurement stage of the projects are transparent and competitive bidding and open advertisements of tender opportunities. These imply that before embarking on PPP housing projects, operators should ensure that there is available land in good locations, sound funding arrangements, and measures for achieving transparency in the schemes.

  16. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2005

    International Nuclear Information System (INIS)

    West Valley Nuclear Services Company WVNSCO and URS Group, Inc.

    2006-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs

  17. Tenure Issues in REDD+ Pilot Project Sites in Tanzania

    Directory of Open Access Journals (Sweden)

    Therese Dokken

    2014-02-01

    Full Text Available REDD+ has been proposed as a viable option for addressing climate change in the near term, and at relatively low cost. There is a broad consensus that clearly defined tenure rights are important for the implementation and success of REDD+, both to manage forests effectively and to protect local communities’ livelihoods. We use primary data from 23 villages in six REDD+ pilot sites in Tanzania to identify causes of deforestation and forest degradation, and tenure rights issues, at the village level prior to project implementation. Further, interviews with project proponents and examination of project documents yields insights into how the proponents plan to address tenure issues. Most villages perceive their tenure as secure and have exclusion rights, while collective action challenges are prevalent in villages experiencing deforestation and forest degradation. These findings suggest that the main tenure issues are related to internal institutional arrangements. While we find that tenure is high on the agenda for all the project proponents, they are mainly focusing on formalization and securing tenure rights from state to community level. Though we do find this to be a precondition for reducing deforestation and degradation, some of their focus should be shifted to strengthening village institutions and enhancing internal compliance.

  18. Nest-site selection in the acorn woodpecker

    Science.gov (United States)

    Hooge, P.N.; Stanback, M.T.; Koenig, Walter D.

    1999-01-01

    Acorn Woodpeckers (Melanerpes formicivorus) at Hastings Reservation in central California prefer to nest in dead limbs in large, dead valley oaks (Quercus lobata) and California sycamores (Platanus racemosa) that are also frequently used as acorn storage trees. Based on 232 nest cavities used over an 18-year period, we tested whether preferred or modal nest-site characters were associated with increased reproductive success (the "nest-site quality" hypothesis). We also examined whether more successful nests were likely to experience more favorable microclimatic conditions or to be less accessible to terrestrial predators. We found only equivocal support for the nest-site quality hypothesis: only 1 of 5 preferred characters and 2 of 10 characters exhibiting a clear modality were correlated with higher reproductive success. All three characteristics of nests known or likely to be associated with a more favorable microclimate, and two of five characteristics likely to render nests less accessible to predators, were correlated with higher reproductive success. These results suggest that nest cavities in this population are built in part to take advantage of favorable microclimatic conditions and, to a lesser extent, to reduce access to predators. However, despite benefits of particular nest characteristics, birds frequently nested in apparently suboptimal cavities. We also found a significant relationship between mean group size and the history of occupancy of particular territories and the probability of nest cavities being built in microclimatically favorable live limbs, suggesting that larger groups residing on more stable territories were better able to construct nests with optimal characteristics. This indicates that there may be demographic, as well as ecological, constraints on nest-site selection in this primary cavity nester.

  19. Selective serotonergic excitation of callosal projection neurons

    Directory of Open Access Journals (Sweden)

    Daniel eAvesar

    2012-03-01

    Full Text Available Serotonin (5-HT acting as a neurotransmitter in the cerebral cortex is critical for cognitive function, yet how 5-HT regulates information processing in cortical circuits is not well understood. We tested the serotonergic responsiveness of layer 5 pyramidal neurons (L5PNs of the mouse medial prefrontal cortex (mPFC, and found 3 distinct response types: long-lasting 5-HT1A (1A receptor-dependent inhibitory responses (84% of L5PNs, 5-HT2A (2A receptor-dependent excitatory responses (9%, and biphasic responses in which 2A-dependent excitation followed brief inhibition (5%. Relative to 5-HT-inhibited neurons, those excited by 5-HT had physiological properties characteristic of callosal/commissural (COM neurons that project to the contralateral cortex. We tested whether serotonergic responses in cortical pyramidal neurons are correlated with their axonal projection pattern using retrograde fluorescent labeling of COM and corticopontine-projecting (CPn neurons. 5-HT generated excitatory or biphasic responses in all 5-HT-responsive layer 5 COM neurons. Conversely, CPn neurons were universally inhibited by 5-HT. Serotonergic excitation of COM neurons was blocked by the 2A antagonist MDL 11939, while serotonergic inhibition of CPn neurons was blocked by the 1A antagonist WAY 100635, confirming a role for these two receptor subtypes in regulating pyramidal neuron activity. Selective serotonergic excitation of COM neurons was not layer-specific, as COM neurons in layer 2/3 were also selectively excited by 5-HT relative to their non-labeled pyramidal neuron neighbors. Because neocortical 2A receptors are implicated in the etiology and pathophysiology of schizophrenia, we propose that COM neurons may represent a novel cellular target for intervention in psychiatric disease.

  20. Despotism and risk of infanticide influence grizzly bear den-site selection.

    Science.gov (United States)

    Libal, Nathan S; Belant, Jerrold L; Leopold, Bruce D; Wang, Guiming; Owen, Patricia A

    2011-01-01

    Given documented social dominance and intraspecific predation in bear populations, the ideal despotic distribution model and sex hypothesis of sexual segregation predict adult female grizzly bears (Ursus arctos) will avoid areas occupied by adult males to reduce risk of infanticide. Under ideal despotic distribution, juveniles should similarly avoid adult males to reduce predation risk. Den-site selection and use is an important component of grizzly bear ecology and may be influenced by multiple factors, including risk from conspecifics. To test the role of predation risk and the sex hypothesis of sexual segregation, we compared adult female (n = 142), adult male (n = 36), and juvenile (n = 35) den locations in Denali National Park and Preserve, Alaska, USA. We measured elevation, aspect, slope, and dominant land cover for each den site, and used maximum entropy modeling to determine which variables best predicted den sites. We identified the global model as the best-fitting model for adult female (area under curve (AUC) = 0.926) and elevation as the best predictive variable for adult male (AUC = 0.880) den sites. The model containing land cover and elevation best-predicted juvenile (AUC = 0.841) den sites. Adult females spatially segregated from adult males, with dens characterized by higher elevations (mean= 1,412 m, SE = 52) and steeper slopes (mean = 21.9°, SE = 1.1) than adult male (elevation: mean = 1,209 m, SE = 76; slope: mean = 15.6°, SE = 1.9) den sites. Juveniles used a broad range of landscape attributes but did not avoid adult male denning areas. Observed spatial segregation by adult females supports the sex hypothesis of sexual segregation and we suggest is a mechanism to reduce risk of infanticide. Den site selection of adult males is likely related to distribution of food resources during spring.

  1. Guidelines for selecting codes for ground-water transport modeling of low-level waste burial sites. Executive summary

    International Nuclear Information System (INIS)

    Simmons, C.S.; Cole, C.R.

    1985-05-01

    This document was written to provide guidance to managers and site operators on how ground-water transport codes should be selected for assessing burial site performance. There is a need for a formal approach to selecting appropriate codes from the multitude of potentially useful ground-water transport codes that are currently available. Code selection is a problem that requires more than merely considering mathematical equation-solving methods. These guidelines are very general and flexible and are also meant for developing systems simulation models to be used to assess the environmental safety of low-level waste burial facilities. Code selection is only a single aspect of the overall objective of developing a systems simulation model for a burial site. The guidance given here is mainly directed toward applications-oriented users, but managers and site operators need to be familiar with this information to direct the development of scientifically credible and defensible transport assessment models. Some specific advice for managers and site operators on how to direct a modeling exercise is based on the following five steps: identify specific questions and study objectives; establish costs and schedules for achieving answers; enlist the aid of professional model applications group; decide on approach with applications group and guide code selection; and facilitate the availability of site-specific data. These five steps for managers/site operators are discussed in detail following an explanation of the nine systems model development steps, which are presented first to clarify what code selection entails

  2. Extended reviewing or the role of potential siting cantons in the ongoing Swiss site selection procedure ('Sectoral Plan')

    International Nuclear Information System (INIS)

    Flueeler, Thomas

    2014-01-01

    The disposition of nuclear waste in Switzerland has a long-standing and sinuous history reflecting its complex socio-technical nature (Flueeler, 2006). Upon the twofold failure to site a repository for low- and intermediate-level radioactive waste at Wellenberg during the 1990's and 2000's, it was recognised that the respective site selections had not been fully transparent. The Swiss government, the Federal Council, accepted the lesson and, after an extensive nationwide consultation at that, established a new site selection process 'from scratch': a systematic, stepwise, traceable, fair and binding procedure with a safety-first approach, yet extensively participatory. The so-called Sectoral Plan for Deep Geological Repositories guarantees the inclusion of the affected and concerned cantons and communities, as well as the relevant authorities in neighbouring countries from an early stage (Swiss Nuclear Energy Act, 2003; BFE, 2008). This contribution shares experience and insights in the ongoing procedure from a cantonal point of view that is an intermediate position between national needs and regional concerns, and with technical regulatory expertise between highly specialised experts and involved publics. (authors)

  3. Industrial Sites Project Establishment of Final Action Levels

    International Nuclear Information System (INIS)

    Boehlecke, Robert F.

    2006-01-01

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) oversees numerous sites on the Nevada Test Site (NTS) and other locations in the State of Nevada that have been impacted by activities related to the development and testing of nuclear devices and by other activities. NNSA/NSO is responsible for protecting members of the public, including site workers, from harmful exposure to both chemical and radiological contaminants at these sites as they remediate these sites. The Nevada Division of Environmental Protection (NDEP) is the primary state agency responsible for protection of human health and the environment with respect to chemical and radiological wastes. In 1996 the DOE, U.S. Department of Defense, and the State of Nevada entered into an agreement known as the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Appendix VI to the FFACO describes the strategy employed to plan, implement, and complete environmental corrective action activities at NTS and other locations in the state of Nevada. One of the categories of corrective action units (CAUs) is Industrial Sites, which consists of approximately 1,150 locations that may require some level of investigation and corrective action. To evaluate the need for the extent of corrective action at a particular site, NNSA/NSO assesses the potential impacts to receptors by comparing measurements of contaminant concentrations to risk-based (chemical) and dose-based (radionuclide) standards (action levels). Preliminary action levels (PALs) are established as part of the data quality objective (DQO) process, and are presented in one or more FFACO documents generated as part of the corrective action process. This document formally defines and clarifies the NDEP-approved process NNSA/NSO Industrial Sites Project uses to fulfill the requirements of the FFACO and state regulations. This process establishes final action levels (FALs) based on the risk

  4. SELECTION OF EFFECTIVE MODELS OF PROJECT IMPLEMENTATION IN A CHANGING FINANCIAL SITUATION

    Directory of Open Access Journals (Sweden)

    Александр Иванович МЕНЕЙЛЮК

    2015-06-01

    Full Text Available The article describes the methods of selecting effective models of construction projects of residential buildings and recommendations for its use. The technique is based on the construction of the models in the program Microsoft Project and analysis using the program COMPEX. Methods can be used not only for building projects. It is especially effective in a variable financial situation.

  5. West Valley Demonstration Project Annual Site Environmental Report Calendard Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2006-09-21

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs.

  6. National inventory of selected biological monitoring programs. Summary report of current or recently completed projects, 1976

    Energy Technology Data Exchange (ETDEWEB)

    Kemp, H. T.

    1976-10-01

    The Inventory has resulted in establishment of a series of data bases containing biological monitoring information of varying types, namely, directory of investigators, record of projects received from mail questionnaire, detailed description of selected biomonitoring projects, and bibliographic citations supporting the projects received. This report contains detailed descriptions of selected biomonitoring projects organized on a state-by-state basis and with appropriate indices.

  7. Site characterization report for the basalt waste isolation project. Volume II

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-11-01

    The reference location for a repository in basalt for the terminal storage of nuclear wastes on the Hanford Site and the candidate horizons within this reference repository location have been identified and the preliminary characterization work in support of the site screening process has been completed. Fifteen technical questions regarding the qualification of the site were identified to be addressed during the detailed site characterization phase of the US Department of Energy-National Waste Terminal Storage Program site selection process. Resolution of these questions will be provided in the final site characterization progress report, currently planned to be issued in 1987, and in the safety analysis report to be submitted with the License Application. The additional information needed to resolve these questions and the plans for obtaining the information have been identified. This Site Characterization Report documents the results of the site screening process, the preliminary site characterization data, the technical issues that need to be addressed, and the plans for resolving these issues. Volume 2 contains chapters 6 through 12: geochemistry; surface hydrology; climatology, meteorology, and air quality; environmental, land-use, and socioeconomic characteristics; repository design; waste package; and performance assessment.

  8. Site characterization report for the basalt waste isolation project. Volume II

    International Nuclear Information System (INIS)

    1982-11-01

    The reference location for a repository in basalt for the terminal storage of nuclear wastes on the Hanford Site and the candidate horizons within this reference repository location have been identified and the preliminary characterization work in support of the site screening process has been completed. Fifteen technical questions regarding the qualification of the site were identified to be addressed during the detailed site characterization phase of the US Department of Energy-National Waste Terminal Storage Program site selection process. Resolution of these questions will be provided in the final site characterization progress report, currently planned to be issued in 1987, and in the safety analysis report to be submitted with the License Application. The additional information needed to resolve these questions and the plans for obtaining the information have been identified. This Site Characterization Report documents the results of the site screening process, the preliminary site characterization data, the technical issues that need to be addressed, and the plans for resolving these issues. Volume 2 contains chapters 6 through 12: geochemistry; surface hydrology; climatology, meteorology, and air quality; environmental, land-use, and socioeconomic characteristics; repository design; waste package; and performance assessment

  9. Adaptive evolution of the spike gene of SARS coronavirus: changes in positively selected sites in different epidemic groups

    Directory of Open Access Journals (Sweden)

    He Shao-Heng

    2006-10-01

    Full Text Available Abstract Background It is believed that animal-to-human transmission of severe acute respiratory syndrome (SARS coronavirus (CoV is the cause of the SARS outbreak worldwide. The spike (S protein is one of the best characterized proteins of SARS-CoV, which plays a key role in SARS-CoV overcoming species barrier and accomplishing interspecies transmission from animals to humans, suggesting that it may be the major target of selective pressure. However, the process of adaptive evolution of S protein and the exact positively selected sites associated with this process remain unknown. Results By investigating the adaptive evolution of S protein, we identified twelve amino acid sites (75, 239, 244, 311, 479, 609, 613, 743, 765, 778, 1148, and 1163 in the S protein under positive selective pressure. Based on phylogenetic tree and epidemiological investigation, SARS outbreak was divided into three epidemic groups: 02–04 interspecies, 03-early-mid, and 03-late epidemic groups in the present study. Positive selection was detected in the first two groups, which represent the course of SARS-CoV interspecies transmission and of viral adaptation to human host, respectively. In contrast, purifying selection was detected in 03-late group. These indicate that S protein experiences variable positive selective pressures before reaching stabilization. A total of 25 sites in 02–04 interspecies epidemic group and 16 sites in 03-early-mid epidemic group were identified under positive selection. The identified sites were different between these two groups except for site 239, which suggests that positively selected sites are changeable between groups. Moreover, it was showed that a larger proportion (24% of positively selected sites was located in receptor-binding domain (RBD than in heptad repeat (HR1-HR2 region in 02–04 interspecies epidemic group (p = 0.0208, and a greater percentage (25% of these sites occurred in HR1–HR2 region than in RBD in 03-early

  10. Decision Making on Regional Landfill Site Selection in Hormozgan Province Using Smce

    Science.gov (United States)

    Majedi, A. S.; Kamali, B. M.; Maghsoudi, R.

    2015-12-01

    Landfill site selection and suitable conditions to bury hazardous wastes are among the most critical issues in modern societies. Taking several factors and limitations into account along with true decision making requires application of different decision techniques. To this end, current paper aims to make decisions about regional landfill site selection in Hormozgan province and utilizes SMCE technique combined with qualitative and quantitative criteria to select the final alternatives. To this respect, we first will describe the existing environmental situation in our study area and set the goals of our study in the framework of SMCE and will analyze the effective factors in regional landfill site selection. Then, methodological procedure of research was conducted using Delphi approach and questionnaires (in order to determine research validity, Chronbach Alpha (0.94) method was used). Spatial multi-criteria analysis model was designed in the form of criteria tree in SMCE using IL WIS software. Prioritization of respective spatial alternatives included: Bandar Abbas city with total 4 spatial alternatives (one zone with 1st priority, one zone with 3rd priority and two zones with 4thpriority) was considered the first priority, Bastak city with total 3 spatial alternatives (one zone with 2nd priority, one zone with 3rdpriorit and one zone with 4th priority) was the second priority and Bandar Abbas, Minab, Jask and Haji Abad cities were considered as the third priority.

  11. Wind data for wind driven plant. [site selection for optimal performance

    Science.gov (United States)

    Stodhart, A. H.

    1973-01-01

    Simple, averaged wind velocity data provide information on energy availability, facilitate generator site selection and enable appropriate operating ranges to be established for windpowered plants. They also provide a basis for the prediction of extreme wind speeds.

  12. The Savannah River Site Replacement High Level Radioactive Waste Evaporator Project

    International Nuclear Information System (INIS)

    Presgrove, S.B.

    1992-01-01

    The Replacement High Level Waste Evaporator Project was conceived in 1985 to reduce the volume of the high level radioactive waste Process of the high level waste has been accomplished up to this time using Bent Tube type evaporators and therefore, that type evaporator was selected for this project. The Title I Design of the project was 70% completed in late 1990. The Department of Energy at that time hired an independent consulting firm to perform a complete review of the project. The DOE placed a STOP ORDER on purchasing the evaporator in January 1991. Essentially, no construction was to be done on this project until all findings and concerns dealing with the type and design of the evaporator are resolved. This report addresses two aspects of the DOE design review; (1) Comparing the Bent Tube Evaporator with the Forced Circulation Evaporator, (2) The design portion of the DOE Project Review - concentrated on the mechanical design properties of the evaporator. 1 ref

  13. Projected large flood event sensitivity to projection selection and temporal downscaling methodology

    Energy Technology Data Exchange (ETDEWEB)

    Raff, D. [U.S. Dept. of the Interior, Bureau of Reclamation, Denver, Colorado (United States)

    2008-07-01

    Large flood events, that influence regulatory guidelines as well as safety of dams decisions, are likely to be affected by climate change. This talk will evaluate the use of climate projections downscaled and run through a rainfall - runoff model and its influence on large flood events. The climate spatial downscaling is performed statistically and a re-sampling and scaling methodology is used to temporally downscale from monthly to daily signals. The signals are run through a National Weather Service operational rainfall-runoff model to produce 6-hour flows. The flows will be evaluated for changes in large events at look-ahead horizons from 2011 - 2040, 2041 - 2070, and 2071 - 2099. The sensitivity of results will be evaluated with respect to projection selection criteria and re-sampling and scaling criteria for the Boise River in Idaho near Lucky Peak Dam. (author)

  14. Projected large flood event sensitivity to projection selection and temporal downscaling methodology

    International Nuclear Information System (INIS)

    Raff, D.

    2008-01-01

    Large flood events, that influence regulatory guidelines as well as safety of dams decisions, are likely to be affected by climate change. This talk will evaluate the use of climate projections downscaled and run through a rainfall - runoff model and its influence on large flood events. The climate spatial downscaling is performed statistically and a re-sampling and scaling methodology is used to temporally downscale from monthly to daily signals. The signals are run through a National Weather Service operational rainfall-runoff model to produce 6-hour flows. The flows will be evaluated for changes in large events at look-ahead horizons from 2011 - 2040, 2041 - 2070, and 2071 - 2099. The sensitivity of results will be evaluated with respect to projection selection criteria and re-sampling and scaling criteria for the Boise River in Idaho near Lucky Peak Dam. (author)

  15. Activity modes selection for project crashing through deterministic simulation

    Directory of Open Access Journals (Sweden)

    Ashok Mohanty

    2011-12-01

    Full Text Available Purpose: The time-cost trade-off problem addressed by CPM-based analytical approaches, assume unlimited resources and the existence of a continuous time-cost function. However, given the discrete nature of most resources, the activities can often be crashed only stepwise. Activity crashing for discrete time-cost function is also known as the activity modes selection problem in the project management. This problem is known to be NP-hard. Sophisticated optimization techniques such as Dynamic Programming, Integer Programming, Genetic Algorithm, Ant Colony Optimization have been used for finding efficient solution to activity modes selection problem. The paper presents a simple method that can provide efficient solution to activity modes selection problem for project crashing.Design/methodology/approach: Simulation based method implemented on electronic spreadsheet to determine activity modes for project crashing. The method is illustrated with the help of an example.Findings: The paper shows that a simple approach based on simple heuristic and deterministic simulation can give good result comparable to sophisticated optimization techniques.Research limitations/implications: The simulation based crashing method presented in this paper is developed to return satisfactory solutions but not necessarily an optimal solution.Practical implications: The use of spreadsheets for solving the Management Science and Operations Research problems make the techniques more accessible to practitioners. Spreadsheets provide a natural interface for model building, are easy to use in terms of inputs, solutions and report generation, and allow users to perform what-if analysis.Originality/value: The paper presents the application of simulation implemented on a spreadsheet to determine efficient solution to discrete time cost tradeoff problem.

  16. Tuning a Protein-Labeling Reaction to Achieve Highly Site Selective Lysine Conjugation.

    Science.gov (United States)

    Pham, Grace H; Ou, Weijia; Bursulaya, Badry; DiDonato, Michael; Herath, Ananda; Jin, Yunho; Hao, Xueshi; Loren, Jon; Spraggon, Glen; Brock, Ansgar; Uno, Tetsuo; Geierstanger, Bernhard H; Cellitti, Susan E

    2018-04-16

    Activated esters are widely used to label proteins at lysine side chains and N termini. These reagents are useful for labeling virtually any protein, but robust reactivity toward primary amines generally precludes site-selective modification. In a unique case, fluorophenyl esters are shown to preferentially label human kappa antibodies at a single lysine (Lys188) within the light-chain constant domain. Neighboring residues His189 and Asp151 contribute to the accelerated rate of labeling at Lys188 relative to the ≈40 other lysine sites. Enriched Lys188 labeling can be enhanced from 50-70 % to >95 % by any of these approaches: lowering reaction temperature, applying flow chemistry, or mutagenesis of specific residues in the surrounding protein environment. Our results demonstrated that activated esters with fluoro-substituted aromatic leaving groups, including a fluoronaphthyl ester, can be generally useful reagents for site-selective lysine labeling of antibodies and other immunoglobulin-type proteins. © 2018 Wiley-VCH Verlag GmbH & Co. KGaA, Weinheim.

  17. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS - Washington Division

    2008-12-17

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

  18. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    International Nuclear Information System (INIS)

    2008-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment

  19. Management of the Cs/Sr Capsule Project at the Hanford Site. Technology Readiness Assessment Report

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2018-01-01

    The Federal Project Director (FPD) for the U.S. Department of Energy (DOE), Richland Operations Office (RL) Waste Management and D&D Division (WMD) requested a Technology Readiness Assessment (TRA) for the Management of the Cesium/Strontium Capsule Storage Project (MCSCP) at the Waste Encapsulation and Storage Facility (WESF) on the Hanford Site in Washington State. The MCSCP CD-1 TRA was performed by a team selected in collaboration between the Office of Environmental Management (EM) Chief Engineer (EM-3.3) and RL, WMD FPD. The TRA Team included subject matter and technical experts having experience in cask storage, process engineering, and system design who were independent of the MCSCP, and the team was led by the Director of Operations and Processes from the EM Chief Engineer's Office (EM-3.32). Movement of the Cs/Sr capsules to dry storage, based on information from the conceptual design, involves (1) capsule packaging, (2) capsule transfer, and (3) capsule storage. The project has developed a conceptual process, described in 30059-R-02, "NAC Conceptual Design Report for the Management of the Cesium and Strontium Capsules Project", which identifies the five major activities in the process to complete the transfer from storage pool to pad-mounted cask storage. The process, shown schematically in Figure 1, is comprised of the following process steps: (1) loading capsules into the UCS; (2) UCS processing; (3) UCS insertion into the TSC Basket; (4) cask transport from WESF to CSA and (5) extended storage at the CSA.

  20. Influence of olfactory and visual cover on nest site selection and nest success for grassland-nesting birds.

    Science.gov (United States)

    Fogarty, Dillon T; Elmore, R Dwayne; Fuhlendorf, Samuel D; Loss, Scott R

    2017-08-01

    Habitat selection by animals is influenced by and mitigates the effects of predation and environmental extremes. For birds, nest site selection is crucial to offspring production because nests are exposed to extreme weather and predation pressure. Predators that forage using olfaction often dominate nest predator communities; therefore, factors that influence olfactory detection (e.g., airflow and weather variables, including turbulence and moisture) should influence nest site selection and survival. However, few studies have assessed the importance of olfactory cover for habitat selection and survival. We assessed whether ground-nesting birds select nest sites based on visual and/or olfactory cover. Additionally, we assessed the importance of visual cover and airflow and weather variables associated with olfactory cover in influencing nest survival. In managed grasslands in Oklahoma, USA, we monitored nests of Northern Bobwhite ( Colinus virginianus ), Eastern Meadowlark ( Sturnella magna ), and Grasshopper Sparrow ( Ammodramus savannarum ) during 2015 and 2016. To assess nest site selection, we compared cover variables between nests and random points. To assess factors influencing nest survival, we used visual cover and olfactory-related measurements (i.e., airflow and weather variables) to model daily nest survival. For nest site selection, nest sites had greater overhead visual cover than random points, but no other significant differences were found. Weather variables hypothesized to influence olfactory detection, specifically precipitation and relative humidity, were the best predictors of and were positively related to daily nest survival. Selection for overhead cover likely contributed to mitigation of thermal extremes and possibly reduced detectability of nests. For daily nest survival, we hypothesize that major nest predators focused on prey other than the monitored species' nests during high moisture conditions, thus increasing nest survival on these

  1. Model of the best-of-N nest-site selection process in honeybees

    Science.gov (United States)

    Reina, Andreagiovanni; Marshall, James A. R.; Trianni, Vito; Bose, Thomas

    2017-05-01

    The ability of a honeybee swarm to select the best nest site plays a fundamental role in determining the future colony's fitness. To date, the nest-site selection process has mostly been modeled and theoretically analyzed for the case of binary decisions. However, when the number of alternative nests is larger than two, the decision-process dynamics qualitatively change. In this work, we extend previous analyses of a value-sensitive decision-making mechanism to a decision process among N nests. First, we present the decision-making dynamics in the symmetric case of N equal-quality nests. Then, we generalize our findings to a best-of-N decision scenario with one superior nest and N -1 inferior nests, previously studied empirically in bees and ants. Whereas previous binary models highlighted the crucial role of inhibitory stop-signaling, the key parameter in our new analysis is the relative time invested by swarm members in individual discovery and in signaling behaviors. Our new analysis reveals conflicting pressures on this ratio in symmetric and best-of-N decisions, which could be solved through a time-dependent signaling strategy. Additionally, our analysis suggests how ecological factors determining the density of suitable nest sites may have led to selective pressures for an optimal stable signaling ratio.

  2. Use of strategic environmental assessment in the site selection process for a radioactive waste disposal facility in Slovenia.

    Science.gov (United States)

    Dermol, Urška; Kontić, Branko

    2011-01-01

    The benefits of strategic environmental considerations in the process of siting a repository for low- and intermediate-level radioactive waste (LILW) are presented. The benefits have been explored by analyzing differences between the two site selection processes. One is a so-called official site selection process, which is implemented by the Agency for radwaste management (ARAO); the other is an optimization process suggested by experts working in the area of environmental impact assessment (EIA) and land-use (spatial) planning. The criteria on which the comparison of the results of the two site selection processes has been based are spatial organization, environmental impact, safety in terms of potential exposure of the population to radioactivity released from the repository, and feasibility of the repository from the technical, financial/economic and social point of view (the latter relates to consent by the local community for siting the repository). The site selection processes have been compared with the support of the decision expert system named DEX. The results of the comparison indicate that the sites selected by ARAO meet fewer suitability criteria than those identified by applying strategic environmental considerations in the framework of the optimization process. This result stands when taking into account spatial, environmental, safety and technical feasibility points of view. Acceptability of a site by a local community could not have been tested, since the formal site selection process has not yet been concluded; this remains as an uncertain and open point of the comparison. Copyright © 2010 Elsevier Ltd. All rights reserved.

  3. Spotted owl roost and nest site selection in northwestern California

    Science.gov (United States)

    J.A. Blakesley; A.B. Franklin; R.J. Gutierrez

    1992-01-01

    We directly observed roost and nest site selection in a population of northern spotted owls (Strix occidentalis caurina) in northwestern California during 1985-89. Because of potential biases caused by use of radio telemetry in previous studies, we examined habitat use relative to habitat availability at a level not previously reported for spotted...

  4. Minimizing Project Cost by Integrating Subcontractor Selection Decisions with Scheduling

    Science.gov (United States)

    Biruk, Sławomir; Jaśkowski, Piotr; Czarnigowska, Agata

    2017-10-01

    Subcontracting has been a worldwide practice in the construction industry. It enables the construction enterprises to focus on their core competences and, at the same time, it makes complex project possible to be delivered. Since general contractors bear full responsibility for the works carried out by their subcontractors, it is their task and their risk to select a right subcontractor for a particular work. Although subcontractor management has been admitted to significantly affect the construction project’s performance, current practices and past research deal with subcontractor management and scheduling separately. The proposed model aims to support subcontracting decisions by integrating subcontractor selection with scheduling to enable the general contractor to select the optimal combination of subcontractors and own crews for all work packages of the project. The model allows for the interactions between the subcontractors and their impacts on the overall project performance in terms of cost and, indirectly, time and quality. The model is intended to be used at the general contractor’s bid preparation stage. The authors claim that the subcontracting decisions should be taken in a two-stage process. The first stage is a prequalification - provision of a short list of capable and reliable subcontractors; this stage is not the focus of the paper. The resulting pool of available resources is divided into two subsets: subcontractors, and general contractor’s in-house crews. Once it has been defined, the next stage is to assign them to the work packages that, bound by fixed precedence constraints, form the project’s network diagram. Each package is possible to be delivered by the general contractor’s crew or some of the potential subcontractors, at a specific time and cost. Particular crews and subcontractors can be contracted more than one package, but not at the same time. Other constraints include the predefined project completion date (the project is

  5. A future for nuclear sites beyond their service life. Nuclear site value development; Un avenir pour les sites nucleaires en fin de cycle. Valorisation des sites nucleaires

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    As the nuclear industry moves into a new development phase, many facilities built in the fifties and sixties are reaching the end of their service life. Dismantling them and rehabilitating the sites on which they stand is a major industrial challenge which will give rise to a number of new projects. AREVA has more than 20 years' experience in these highly technical fields. As more and more sites reach the end of their service life, AREVA considers nuclear site value development as a fully-fledged industrial activity. The group's competencies in this field have been grouped together to form a dedicated entity: the Nuclear Site Value Development Business Unit, created in 2008. Several billion euros are invested in site value development projects which are far-reaching and complex, and often last for several decades. Long before work actually begins, lengthy studies and preparations are required to schedule operations, select the techniques to be used and optimize costs and deadlines. The Nuclear Site Value Development BU is currently working on four major projects involving its own facilities and those of the CEA: - La Hague: dismantling of the first generation of used fuel recycling facilities. Between 1966 and 1998, almost 5,000 tons of used fuel from graphite-moderated gas-cooled reactors, 4,500 tons of light water reactor fuel, as well as fuel from fast reactors and research reactors, were treated at UP2 400, the very first industrial recycling plant on the La Hague site. - Marcoule: first-time dismantling of a recycling plant. 1,000 rooms to be cleaned up, 30,000 tons of waste to be treated, 30 years of work. - Cadarache: first-time dismantling of a Mox fuel fabrication plant. The Cadarache plant was commissioned in 1962 to fabricate fuel for fast reactors; this was followed by MOX fuel for light water reactors, an activity which continued until the plant was shut down in 2003. - Annecy and Veurey: giving a new lease of life to former industrial sites

  6. Geological factors of disposal site selection for low-and intermediate-level solid radwastes in China

    International Nuclear Information System (INIS)

    Chen Zhangru

    1993-01-01

    For disposal of low- and intermediate-level solid radioactive wastes, shallow-ground disposal can provide adequate isolation of waste from human for a fairly long period of time. The objective of disposal site selection is to ensure that the natural properties of the site together with the engineered barrier site shall provide adequate isolation of radionuclides from the human beings and environment, so the whole disposal system can keep the radiological impact within an acceptable level. Since the early 1980's, complying with the national standards and the expert's conception as well as the related IAEA Criteria, geological selection of disposal sites for low-and intermediate-level solid radwastes has been carried out in East China, South China, Northwest China and Southwest China separately. Finally, 5 candidate sites were recommended to the CNNC

  7. New Method of Selecting Efficient Project Portfolios in the Presence of Hybrid Uncertainty

    Directory of Open Access Journals (Sweden)

    Bogdan Rębiasz

    2016-01-01

    Full Text Available A new methods of selecting efficient project portfolios in the presence of hybrid uncertainty has been presented. Pareto optimal solutions have been defined by an algorithm for generating project portfolios. The method presented allows us to select efficient project portfolios taking into account statistical and economic dependencies between projects when some of the parameters used in the calculation of effectiveness can be expressed in the form of an interactive possibility distribution and some in the form of a probability distribution. The procedure for processing such hybrid data combines stochastic simulation with nonlinear programming. The interaction between data are modeled by correlation matrices and the interval regression. Economic dependences are taken into account by the equations balancing the production capacity of the company. The practical example presented indicates that an interaction between projects has a significant impact on the results of calculations. (original abstract

  8. Decarboxylative alkylation for site-selective bioconjugation of native proteins via oxidation potentials

    Science.gov (United States)

    Bloom, Steven; Liu, Chun; Kölmel, Dominik K.; Qiao, Jennifer X.; Zhang, Yong; Poss, Michael A.; Ewing, William R.; MacMillan, David W. C.

    2018-02-01

    The advent of antibody-drug conjugates as pharmaceuticals has fuelled a need for reliable methods of site-selective protein modification that furnish homogeneous adducts. Although bioorthogonal methods that use engineered amino acids often provide an elegant solution to the question of selective functionalization, achieving homogeneity using native amino acids remains a challenge. Here, we explore visible-light-mediated single-electron transfer as a mechanism towards enabling site- and chemoselective bioconjugation. Specifically, we demonstrate the use of photoredox catalysis as a platform to selectivity wherein the discrepancy in oxidation potentials between internal versus C-terminal carboxylates can be exploited towards obtaining C-terminal functionalization exclusively. This oxidation potential-gated technology is amenable to endogenous peptides and has been successfully demonstrated on the protein insulin. As a fundamentally new approach to bioconjugation this methodology provides a blueprint toward the development of photoredox catalysis as a generic platform to target other redox-active side chains for native conjugation.

  9. Decarboxylative alkylation for site-selective bioconjugation of native proteins via oxidation potentials.

    Science.gov (United States)

    Bloom, Steven; Liu, Chun; Kölmel, Dominik K; Qiao, Jennifer X; Zhang, Yong; Poss, Michael A; Ewing, William R; MacMillan, David W C

    2018-02-01

    The advent of antibody-drug conjugates as pharmaceuticals has fuelled a need for reliable methods of site-selective protein modification that furnish homogeneous adducts. Although bioorthogonal methods that use engineered amino acids often provide an elegant solution to the question of selective functionalization, achieving homogeneity using native amino acids remains a challenge. Here, we explore visible-light-mediated single-electron transfer as a mechanism towards enabling site- and chemoselective bioconjugation. Specifically, we demonstrate the use of photoredox catalysis as a platform to selectivity wherein the discrepancy in oxidation potentials between internal versus C-terminal carboxylates can be exploited towards obtaining C-terminal functionalization exclusively. This oxidation potential-gated technology is amenable to endogenous peptides and has been successfully demonstrated on the protein insulin. As a fundamentally new approach to bioconjugation this methodology provides a blueprint toward the development of photoredox catalysis as a generic platform to target other redox-active side chains for native conjugation.

  10. Summary of field operations Technical Area I well PGS-1. Site-Wide Hydrogeologic Characterization Project

    International Nuclear Information System (INIS)

    Fritts, J.E.; McCord, J.P.

    1995-02-01

    The Environmental Restoration (ER) Project at Sandia National Laboratories, New Mexico is managing the project to assess and, when necessary, to remediate sites contaminated by the lab operations. Within the ER project, the site-wide hydrogeologic characterization task is responsible for the area-wide hydrogeologic investigation. The purpose of this task is to reduce the uncertainty about the rate and direction of groundwater flow beneath the area and across its boundaries. This specific report deals with the installation of PGS-1 monitoring well which provides information on the lithology and hydrology of the aquifer in the northern area of the Kirtland Air Force Base. The report provides information on the well design; surface geology; stratigraphy; structure; drilling, completion, and development techniques; and borehole geophysics information

  11. The Bonebrake Theological Seminary: Top-Secret Manhattan Project Site

    Science.gov (United States)

    Sopka, Katherine R.; Sopka, Elisabeth M.

    2010-09-01

    We discuss the top-secret Manhattan Project site established at the Bonebrake Theological Seminary in 1943 in Dayton, Ohio, where research on polonium and its production was carried out. The polonium produced there was then transported to Los Alamos to be used in a polonium-beryllium neutron source whose purpose was to ignite the plutonium implosion bomb that would be dropped on Nagasaki, Japan, on August 9, 1945. Our account is based primarily on the recollections of John J. Sopka, research physicist at the Bonebrake laboratory.

  12. Transfer metrics analytics project

    CERN Document Server

    Matonis, Zygimantas

    2016-01-01

    This report represents work done towards predicting transfer rates/latencies on Worldwide LHC Computing Grid (WLCG) sites using Machine Learning techniques. Topic covered are technologies used for the project, data preparation for ML suitable format and attribute selection as well as a comparison of different ML algorithms.

  13. Inclusion of social indicators in decision support tools for the selection of sustainable site remediation options.

    Science.gov (United States)

    Cappuyns, Valérie

    2016-12-15

    Sustainable remediation requires a balanced decision-making process in which environmental, economic and social aspects of different remediation options are all considered together and the optimum remediation solution is selected. More attention has been paid to the evaluation of environmental and economic aspects, in particular to reduce the human and environmental risks and the remediation costs, to the exclusion of social aspects of remediation. This paper investigates how social aspects are currently considered in sustainability assessments of remediation projects. A selection of decision support tools (DSTs), used for the sustainability assessment of a remediation project, is analyzed to define how social aspects are considered in those tools. The social indicator categories of the Sustainable Remediation Forum - United Kingdom (SuRF-UK), are used as a basis for this evaluation. The consideration of social aspects in the investigated decision support tools is limited, but a clear increase is noticed in more recently developed tools. Among the five social indicator categories defined by SuRF-UK to facilitate a holistic consideration of social aspects of a remediation project only "Human health and safety" is systematically taken into account. "Neighbourhood and locality" is also often addressed, mostly emphasizing the potential disturbance caused by the remediation activities. However, the evaluation of 'Ethics and Equality', Communities and community involvement', and 'Uncertainty and evidence' is often neglected. Nevertheless, concrete examples can be found in some of the investigated tools. Specific legislation, standard procedures, and guidelines that have to be followed in a region or country are mainly been set up in the context of protecting human and ecosystem health, safety and prevention of nuisance. However, they sometimes already include some of the aspects addressed by the social indicators. In this perspective the use of DST to evaluate the

  14. Value of Information Analysis Project Gnome Site, New Mexico

    International Nuclear Information System (INIS)

    Pohll, Greg; Chapman, Jenny

    2010-01-01

    The Project Gnome site in southeastern New Mexico was the location of an underground nuclear detonation in 1961 and a hydrologic tracer test using radionuclides in 1963. The tracer test is recognized as having greater radionuclide migration potential than the nuclear test because the tracer test radionuclides (tritium, 90Sr, 131I, and 137Cs) are in direct contact with the Culebra Dolomite aquifer, whereas the nuclear test is within a bedded salt formation. The tracer test is the topic here. Recognizing previous analyses of the fate of the Gnome tracer test contaminants (Pohll and Pohlmann, 1996; Pohlmann and Andricevic, 1994), and the existence of a large body of relevant investigations and analyses associated with the nearby Waste Isolation Pilot Plant (WIPP) site (summarized in US DOE, 2009), the Gnome Site Characterization Work Plan (U.S. DOE, 2002) called for a Data Decision Analysis to determine whether or not additional characterization data are needed prior to evaluating existing subsurface intrusion restrictions and determining long-term monitoring for the tracer test. Specifically, the Work Plan called for the analysis to weigh the potential reduction in uncertainty from additional data collection against the cost of such field efforts.

  15. The evaluation of effective criteria on site selection for energy production units from cellulosic biomass in Iran

    Directory of Open Access Journals (Sweden)

    Majid Azizi

    2017-12-01

    Full Text Available Both Analytical Hierarchy Process (AHP and benefits, opportunities, costs and risks (BOCR techniques were used successfully to evaluate the effective criteria on site selection for energy production unit development from cellulosic biomass in Iran. The results showed that the benefits criteria was at the first level while the initial cellulosic raw materials and opportunities with the aim of the local economy had the second position as the most important indices on site selection. In addition, third criterion has been introduced for the costs criteria (transportation cost and social barriers by the experts. However, risks criteria which referred to instability of providing cellulosic raw materials is one of the less important effective indices on site selection to make energy production unit. The results illustrated that the economy and politics as two environmental effective factors affected on the site selection process generally.

  16. Progress report on decommissioning activities at the Fernald Environmental Management Project (FEMP) site

    International Nuclear Information System (INIS)

    1998-01-01

    The Fernald Environmental Management Project (FEMP), is located about 18 miles northwest of Cincinnati, Ohio. Between 1953 and 1989, the facility, then called the Feed Material Production Center or FMPC, produced uranium metal products used in the eventual production of weapons grade material for use by other US Department of Energy (DOE) sites. In 1989, FMPC's production was suspended by the federal government in order to focus resources on environmental restoration versus defense production. In 1992, Fluor Daniel Fernald assumed responsibility for managing all cleanup activities at the FEMP under contract to the DOE. In 1990, as part of the remediation effort, the site was divided into five operable units based on physical proximity of contaminated areas, similar amounts of types of contamination, or the potential for a similar technology to be used in cleanup activities. This report continues the outline of the decontamination and decommissioning (D and D) activities at the FEMP site Operable Unit 3 (OU3) and provides an update on the status of the decommissioning activities. OU3, the Facilities Closure and Demolition Project, involves the remediation of more than 200 uranium processing facilities. The mission of the project is to remove nuclear materials stored in these buildings, then perform the clean out of the buildings and equipment, and decontaminate and dismantle the facilities

  17. Geological Consideration for the Site Selection of Radioactive Waste at the PPTN Serpong Area

    International Nuclear Information System (INIS)

    Sucipta

    2002-01-01

    Geological consideration is a main aspect in the exploration or selection of site for radioactive waste repository, because, really that repository site must be surrounded by geological system (geosphere). The objective of the site selection is to obtain a site which geologically capable to prevent the escape of waste pollution from repository to biosphere. Beside that the site must be free from geological processes which harmfull to longterm stability of the site. Descriptive analysis method was applied in this research and combined with evaluation by scoring methods. From the analysis result could be identified that PPTN Serpong morphologically consist of undulatory plains (elevation 80-100 m above msl), the lithology are alluvial deposits. Quarternary tuffs, pumiceous tuffs, clayey tuffs. sandy tuffs and limestone. The geological structure was supposed a horst and graben which buried more than 15 m since Pleistocene. Hydrological condition are moderately run-off, and the distance to the river is about 160 m. The depth of groundwater is 8.3 m, with parallel drainage system. Geological resources found in the site are land and groundwater. The most potential of geological hazard is supposed a rock mass movement. By the land evaluation could be concluded that PPTN Serpong area have moderate suitability for NSD site. (author)

  18. Nuclear site selection and environmental protection. The decision making methods

    International Nuclear Information System (INIS)

    Bresson, G.; Lacourly, G.; Fitoussi, L.

    1975-01-01

    The selection of the site of a nuclear plant most often comes to seek out and compound between two trends: that of the operator who will try and reduce the cost price of his product to the lowest and that of the protectionist who will try and reduce to the minimum the hazards resulting from the plant operation. Such a compromise is the result of a more or less empirical choice, which enters within the frame of a cost-benefit analysis, in which theoretically, the choice between several possible solutions is made of the selection giving the higher advantage [fr

  19. Key Determinant Derivations for Information Technology Disaster Recovery Site Selection by the Multi-Criterion Decision Making Method

    Directory of Open Access Journals (Sweden)

    Chia-Lee Yang

    2015-05-01

    Full Text Available Disaster recovery sites are an important mechanism in continuous IT system operations. Such mechanisms can sustain IT availability and reduce business losses during natural or human-made disasters. Concerning the cost and risk aspects, the IT disaster-recovery site selection problems are multi-criterion decision making (MCDM problems in nature. For such problems, the decision aspects include the availability of the service, recovery time requirements, service performance, and more. The importance and complexities of IT disaster recovery sites increases with advances in IT and the categories of possible disasters. The modern IT disaster recovery site selection process requires further investigation. However, very few researchers tried to study related issues during past years based on the authors’ extremely limited knowledge. Thus, this paper aims to derive the aspects and criteria for evaluating and selecting a modern IT disaster recovery site. A hybrid MCDM framework consisting of the Decision Making Trial and Evaluation Laboratory (DEMATEL and the Analytic Network Process (ANP will be proposed to construct the complex influence relations between aspects as well as criteria and further, derive weight associated with each aspect and criteria. The criteria with higher weight can be used for evaluating and selecting the most suitable IT disaster recovery sites. In the future, the proposed analytic framework can be used for evaluating and selecting a disaster recovery site for data centers by public institutes or private firms.

  20. Improve services project -- Republic of the Marshall Islands.

    Science.gov (United States)

    Langidrik, J

    1995-01-01

    The Republic of the Marshall Islands has 60 dispensary sites, each staffed by 1 health assistant, to cover 80-800 people/site on 34 atolls. Until the spring of 1994, only curative services were available on a regular basis, and preventive services were provided by traveling health teams from the urban centers. In 1994, the health assistants in selected outer islands were trained to administer immunizations from vaccines which are sent regularly by air. Additional project sites are being selected. In 1993, 2 dispensaries initiated a project to 1) increase the number of women with access to prenatal care during the first trimester, 2) increase immunization levels, 3) improve access to preventive services, and 4) improve reporting and record-keeping systems. This project includes an important training component for the health assistant, the wife of the health assistant, the traditional birth attendant, the youth peer educator, community leaders, and a member of the local council. By 1994, this project was expanded to 13 dispensaries on 2 atolls. In 1995, 18 more dispensaries on 4 more atolls will be able to offer these additional services.