WorldWideScience

Sample records for project selection system

  1. IT Project Selection

    DEFF Research Database (Denmark)

    Pedersen, Keld

    2016-01-01

    for initiation. Most of the research on project selection is normative, suggesting new methods, but available empirical studies indicate that many methods are seldom used in practice. This paper addresses the issue by providing increased understanding of IT project selection practice, thereby facilitating...... the development of methods that better fit current practice. The study is based on naturalistic decision-making theory and interviews with experienced project portfolio managers who, when selecting projects, primarily rely on political skills, experience and personal networks rather than on formal IT project......-selection methods, and these findings point to new areas for developing new methodological support for IT project selection....

  2. PROJECT W-551 INTERIM PRETREATMENT SYSTEM TECHNOLOGY SELECTION SUMMARY DECISION REPORT AND RECOMMENDATION

    International Nuclear Information System (INIS)

    CONRAD EA

    2008-01-01

    This report provides the conclusions of the tank farm interim pretreatment technology decision process. It documents the methodology, data, and results of the selection of cross-flow filtration and ion exchange technologies for implementation in project W-551, Interim Pretreatment System. This selection resulted from the evaluation of specific scope criteria using quantitative and qualitative analyses, group workshops, and technical expert personnel

  3. Hybrid Multicriteria Group Decision Making Method for Information System Project Selection Based on Intuitionistic Fuzzy Theory

    Directory of Open Access Journals (Sweden)

    Jian Guo

    2013-01-01

    Full Text Available Information system (IS project selection is of critical importance to every organization in dynamic competing environment. The aim of this paper is to develop a hybrid multicriteria group decision making approach based on intuitionistic fuzzy theory for IS project selection. The decision makers’ assessment information can be expressed in the form of real numbers, interval-valued numbers, linguistic variables, and intuitionistic fuzzy numbers (IFNs. All these evaluation pieces of information can be transformed to the form of IFNs. Intuitionistic fuzzy weighted averaging (IFWA operator is utilized to aggregate individual opinions of decision makers into a group opinion. Intuitionistic fuzzy entropy is used to obtain the entropy weights of the criteria. TOPSIS method combined with intuitionistic fuzzy set is proposed to select appropriate IS project in group decision making environment. Finally, a numerical example for information system projects selection is given to illustrate application of hybrid multi-criteria group decision making (MCGDM method based on intuitionistic fuzzy theory and TOPSIS method.

  4. PROJECT W-551 DETERMINATION DATA FOR EARLY LAW INTERIM PRETREATMENT SYSTEM SELECTION

    Energy Technology Data Exchange (ETDEWEB)

    TEDESCHI AR

    2008-08-11

    This report provides the detailed assessment forms and data for selection of the solids separation and cesium separation technology for project W-551, Interim Pretreatment System. This project will provide early pretreated low activity waste feed to the Waste Treatment Plant to allow Waste Treatment Plan Low Activity Waste facility operation prior to construction completion of the Pretreatment and High Level Waste facilities. The candidate solids separations technologies are rotary microfiltration and crossflow filtration, and the candidate cesium separation technologies are fractional crystallization, caustic-side solvent extraction, and ion-exchange using spherical resorcinol-formaldehyde resin. This data was used to prepare a cross-cutting technology summary, reported in RPP-RPT-37740.

  5. PORTFOLIO SELECTION OF INFORMATION SYSTEMS PROJECTS USING PROMETHEE V WITH C-OPTIMAL CONCEPT

    Directory of Open Access Journals (Sweden)

    Jonatas A. de Almeida

    2014-05-01

    Full Text Available This paper presents a multicriteria decision model for selecting a portfolio of information system (IS projects, which integrates strategic and organizational view within a multicriteria decision structure. The PROMETHEE V method, based on outranking relations is applied, considering the c-optimal concept in order to overcome some scaling problems found in the classical PROMETHEE V approach. Then, a procedure is proposed in order to make a final analysis of the c-optimal portfolios found as a result of using PROMETHEE V. Also, the organizational view is discussed, including some factors that may influence decision making on IS projects to be included in the portfolio, such as adding the company's strategic vision and technical aspects that demonstrate how IS contributes value to a company's business.

  6. THE PROJECT OF THE EXPERT SYSTEM TO SUPPORTING OF SELECTION OF PARTS AND ASSEMBLIES OF MACHINES

    Directory of Open Access Journals (Sweden)

    Sebastian RZYDZIK

    2014-06-01

    Full Text Available This paper the design of the expert system that supports mechanical engineer in the process of selecting the parts and assemblies was presented. In the description of the proposed expert system, was made reference to the general form of such systems, that consist of such components as: user interface, inference engine, knowledge base and database. It also, scenario that describes the steps of the use of the proposed expert system was presented. Finally, an example of the use the expert system during the selection of the components of the drive system was shown.

  7. Review of selected contributions of the conference 'Project control in quality management systems'

    International Nuclear Information System (INIS)

    2008-04-01

    There were 12 contributions presented of the conference focused on the project management in quality management systems. Contributions were focused both on theoretical problems from the project management area and on the applications in practice in management systems implementation in accordance with the standards: STN EN ISO 9001:2000, STN EN ISO 14 001:2005, and OHSAS 18 001:1999. One contribution was focused on the project management in the project of preparation of finishing of the building of the Nuclear Power Plant Mochovce of 3. and 4. block and one contribution was focused on the amendment of the Atomic Act or on the preparation of the new Atomic Act with regard to duty of transposition of the Directive of the Council 2006/117/Euratom on control and supervision of the overseas transportations of radioactive waste and nuclear fuel burnt-up into legislation of the Slovak Republic

  8. Artificial neural network decision support systems for new product development project selection

    NARCIS (Netherlands)

    Thieme, R.J.; Song, Michael; Calantone, R.J.

    2000-01-01

    The authors extend and develop an artificial neural network decision support system and demonstrate how it can guide managers when they make complex new product development decisions. The authors use data from 612 projects to compare this new method with traditional methods for predicting various

  9. Performance-Based Technology Selection Filter description report. INEL Buried Waste Integrated Demonstration System Analysis project

    Energy Technology Data Exchange (ETDEWEB)

    O`Brien, M.C.; Morrison, J.L.; Morneau, R.A.; Rudin, M.J.; Richardson, J.G.

    1992-05-01

    A formal methodology has been developed for identifying technology gaps and assessing innovative or postulated technologies for inclusion in proposed Buried Waste Integrated Demonstration (BWID) remediation systems. Called the Performance-Based Technology Selection Filter, the methodology provides a formalized selection process where technologies and systems are rated and assessments made based on performance measures, and regulatory and technical requirements. The results are auditable, and can be validated with field data. This analysis methodology will be applied to the remedial action of transuranic contaminated waste pits and trenches buried at the Idaho National Engineering Laboratory (INEL).

  10. Discriminative Projection Selection Based Face Image Hashing

    Science.gov (United States)

    Karabat, Cagatay; Erdogan, Hakan

    Face image hashing is an emerging method used in biometric verification systems. In this paper, we propose a novel face image hashing method based on a new technique called discriminative projection selection. We apply the Fisher criterion for selecting the rows of a random projection matrix in a user-dependent fashion. Moreover, another contribution of this paper is to employ a bimodal Gaussian mixture model at the quantization step. Our simulation results on three different databases demonstrate that the proposed method has superior performance in comparison to previously proposed random projection based methods.

  11. Application of Systems Engineering to U.S. Department of Energy Privatization Project Selection at the Hanford Nuclear Reservation

    International Nuclear Information System (INIS)

    Layman, John Scott

    1999-01-01

    The privatization efforts at the U.S. Department of Energy's Hanford Nuclear Reservation have been very successful primarily due to a disciplined process for project selection and execution. Early in the development of Privatization at Hanford, the Department of Energy determined that a disciplined alternatives generation and analysis (AGA) process would furnish the candidate projects with the best probability for success. Many factors had to be considered in the selection of projects. Westinghouse Hanford Company was assigned to develop this process and facilitate the selection of the first round of candidate privatization projects. Team members for the AGA process were assembled from all concerned organizations and skill groups. Among the selection criteria were legal, financial and technical considerations which had to be weighed

  12. Selecting users for participation in IT projects

    DEFF Research Database (Denmark)

    Rasmussen, Rasmus; Christensen, Anders S.; Fjeldsted, Tobias

    2011-01-01

    The selection of users for participation in IT projects involves trade-offs between multiple criteria, one of which is selecting a representative cross-section of users. This criterion is basic because trading it for other criteria means basing designs on information biased toward some user groups...... at the expense of others. Based on interviews in development and customer organizations we find that their criteria for user selection favour persons who can contribute to the progress of the IT project over persons who are representative of the full range of users. A highly valued contribution from...... participating users is the ability to advocate a vision for the system and champion its organizational implementation. A survey in one customer organization shows that respondents’ personal traits explain up to 31% of the variation in their experience of aspects of the usability of a recently introduced system...

  13. IDENTIFICATION AND SELECTION OF SIX SIGMA PROJECTS

    Directory of Open Access Journals (Sweden)

    Abdalhkeim FA. Flifel

    2017-04-01

    Full Text Available Six Sigma is a well-structured and proven methodology for improving organizational performance. It helps achieving the goals of the organization through the use of project-driven approach. The implementation of Six sigma approach depends on proper identification and selection of projects, moreover, the selection of right Six sigma projects is one of the critical success factors of six sigma efforts. The paper provides the sources for the identification of potential projects, top down and bottom up approaches, the process of selection of projects, guidelines that assist the selection of appropriate projects, selection criteria which must be precisely chosen in accordance with the objectives, needs and capabilities of the organization as well as sophisticated techniques and tools recommended in the literature for the selection of projects.

  14. Project delivery system (PDS)

    CERN Document Server

    2001-01-01

    As business environments become increasingly competitive, companies seek more comprehensive solutions to the delivery of their projects. "Project Delivery System: Fourth Edition" describes the process-driven project delivery systems which incorporates the best practices from Total Quality and is aligned with the Project Management Institute and ISO Quality Standards is the means by which projects are consistently and efficiently planned, executed and completed to the satisfaction of clients and customers.

  15. Earth System Science Project

    Science.gov (United States)

    Rutherford, Sandra; Coffman, Margaret

    2004-01-01

    For several decades, science teachers have used bottles for classroom projects designed to teach students about biology. Bottle projects do not have to just focus on biology, however. These projects can also be used to engage students in Earth science topics. This article describes the Earth System Science Project, which was adapted and developed…

  16. Project W-420 stack monitoring system upgrades

    International Nuclear Information System (INIS)

    CARPENTER, K.E.

    1999-01-01

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420

  17. Health System Measurement Project

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Health System Measurement Project tracks government data on critical U.S. health system indicators. The website presents national trend data as well as detailed...

  18. Project Selection for NASA's R&D Programs

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of NASA s Research and Development (R&D) programs is to provide advanced human support technologies for the Exploration Systems Mission Directorate (ESMD). The new technologies must be sufficiently attractive and proven to be selectable for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are likely options for flight. The R&D programs must select an array of technology development projects, manage them, and either terminate or continue them, so as to maximize the delivered number of potentially usable advanced human support technologies. This paper proposes an effective project selection methodology to help manage NASA R&D project portfolios.

  19. Project governance: selected South African government experiments

    Directory of Open Access Journals (Sweden)

    G. van der Walt

    2008-07-01

    Full Text Available Some form of accountability and power structure binds all organisations. Such structures are typically referred to as the “governance” structure of the organisation. In organisations that have relatively mature project applications and methodologies in place, governance mechanisms are established on more permanent bases. With its focus on performance, results and outcomes, project governance establishes decision-making structures, as well as accountability and responsibility mechanisms in public institutions to oversee projects. As government institutions increasingly place emphasis on project applications for policy implementation and service delivery initiatives, mechanisms or structures should be established to facilitate clear interfaces between the permanent organisation and the temporary project organisation. Such mechanisms or structures should enhance the governance of projects, that is, the strategic alignment of projects, the decentralisation of decision- making powers, rapid resource allocation, and the participation of external stakeholders. The purpose of this article is to explore the concept “project governance”, and to highlight examples of project governance as applied in selected government departments in provincial and national spheres. This would enable the establishment of best practice examples and assist to develop benchmarks for effective project applications for service delivery improvement.

  20. COST AND TIME ESTIMATES DURING THE SUPPLIER SELECTION OF AN INFORMATION SYSTEM FOR LEGAL AREA: A CASE STUDY COMPARING TRADITIONAL AND AGILE PROJECT APPROACHES

    Directory of Open Access Journals (Sweden)

    Vieira, G. L. S.

    2017-06-01

    Full Text Available Considering a direct correlation between projects requirements details levels and their performance, this paper aims to evaluate whether the adoption of more extensive and detailed cost, time and scope estimation processes based on both practices, traditional and agile, and executed concurrently with the supplier selection stage, could guarantee greater accuracy in these estimates, thus increasing project success rates. Based on a case study for the information system project implementation into the legal area of a large Brazilian company, five suppliers had their proposals analyzed and compared in terms of the costs and deadlines involved, as well as the project management processes used in theirs estimates. From the obtained results, it was possible to observe that not all companies follow, at least during the prospecting phase, their service proposals described management processes, according to the theory. Another important finding was that the proposals involving, at least partially, agile approach concepts, were more likely to justify their estimates. These proposals still presented lower values, whenever compared to those less adherents to the theoretical concepts, as those based on traditional concepts.

  1. ANP applied to electronics engineering project selection

    International Nuclear Information System (INIS)

    Habib, M.

    2010-01-01

    Project selection in Electronics engineering is a complex decision-making process. This research paper illustrates an application of ANP/AHP process. The AHP (Analytic Hierarchy Process) is employed to break down large unstructured decision problems into manageable and measureable components. The ANP, as the general form of AHP, is powerful to deal with complex decisions where interdependence exists in a decision model. The research paper discusses the use of the ANP, a general form of Saaty's analytic Network process, as a model to evaluate the value of competing Electronics projects. The research paper concludes with a case study describing the implementation of this model at an engineering college, including data based on the actual use of the decision making model. The case study helps to verify that AHP is an effective and efficient decision-making tool. A major contribution of this work is to provide a methodology for assessing the best project. Despite a number of publications applying AHP in project selection, this is probably the first time that an attempt has been made to apply AHP in an electronics project selection in an engineering university environment. (author)

  2. Selection of topologies for the PHOTONERGY{sup TM} project. Optimised design and control of inverter for photovoltaic systems: the AC-module

    Energy Technology Data Exchange (ETDEWEB)

    Baekhoej Kjaer, S.

    2002-06-01

    The PHOTONERGY{sup TM} project (also known as the former 'SolcelleInverter' project) is by this report carried into its third stage; the selection of a suitable topology for the AC-Module inverter. The selection of a suitable topology is based on State-Of-The-Art analysis a specifications and a comparison of four grid-tied inverters and nine dc/dc converters. This implies 23 possible combinations, from which nine is investigated with respect to efficiency in six working points, the number of components and to some extent also the rating of the components. The conclusion is that the target of a European efficiency of 93.7% is hard to achieve. But four of the examined, and two newly discovered, inverters are recommended for a further examination by means of estimations, calculations and simulations of: cost, complexity, robustness, efficiency and mass-production. The system-layout is also examined. The first layout implies that the PV-Module and the inverter is integrated into one unit and the second layout involves that the inverter is placed indoor. The layouts are compared with respect to cable-losses, enclosure demanding and lifetime. The conclusion is somehow ambiguous and a further investigation should be initiated in order to get a clear result. (au)

  3. Selecting a silvicultural system

    Science.gov (United States)

    Richard M. Godman

    1992-01-01

    Sometimes a name creates a problem. The name of a silvicultural system usually refers to the way a stand is cut to get regeneration-"single tree selection"-for example. Trouble is, the name suggests that the regeneration cut will be the first treatment applied to the stand. Not so. We are now mostly making "intermediate" cuts in our Lake States...

  4. RAMI modeling of selected balance of plant systems for the proposed Accelerator Production of Tritium (APT) project

    International Nuclear Information System (INIS)

    Radder, J.A.; Cramer, D.S.

    1997-01-01

    In order to meet Department of Energy (DOE) Defense Program requirements for tritium in the 2005-2007 time frame, new production capability must be made available. The Accelerator Production of Tritium (APT) Plant is being considered as an alternative to nuclear reactor production of tritium, which has been the preferred method in the past. The proposed APT plant will use a high-power proton accelerator to generate thermal neutrons that will be captured in 3 He to produce tritium (3H). It is expected that the APT Plant will be built and operated at the DOE's Savannah River Site (SRS) in Aiken, South Carolina. Discussion is focused on Reliability, Availability, Maintainability, and Inspectability (RAMI) modeling of recent conceptual designs for balance of plant (BOP) systems in the proposed APT Plant. In the conceptual designs for balance of plant (BOP) systems in the proposed APT Plant. In the conceptual design phase, system RAMI estimates are necessary to identify the best possible system alternative and to provide a valid picture of the cost effectiveness of the proposed system for comparison with other system alternatives. RAMI estimates in the phase must necessarily be based on generic data. The objective of the RAMI analyses at the conceptual design stage is to assist the designers in achieving an optimum design which balances the reliability and maintainability requirements among the subsystems and components

  5. Evaluation tool for selection and optimisation of hydrogen demonstration projects. Application to a decentralized renewable hydrogen system

    International Nuclear Information System (INIS)

    Bracht, M.; De Groot, A.; Gregoire Padro, C.E.; Schucan, T.H.; Skolnik, E.

    1998-06-01

    As part of the International Energy Agency Hydrogen Implementing Agreement, an evaluation tool to assist in the design, operation and optimisation of hydrogen demonstration facilities is under development. Using commercially available flowsheet simulation software (ASPEN- Plus) as the integrating platform, this tool is designed to provide system developers with a comprehensive data base or library of component models and an integrating platform through which these models may be linked. By combining several energy system components a conceptual design of a integrated hydrogen energy system can be made. As a part of the tool and connected to the library are design guidelines which can help finding the optimal configuration in the design process. The component categories considered include: production, storage, transport, distribution and end use. Many component models have already been included in the initial test platform. The use of the tool will be illustrated by presenting the results of a specific sample system that has been designed and assessed with use of the tool. The system considered is a decentralized renewable hydrogen system in which the hydrogen is produced by biomass gasification or pyrolysis, the produced hydrogen is transported through a pipeline or with a tank truck. The storage options that are considered are liquid hydrogen and compressed gas. The hydrogen is dispensed through a refueling station. Several options for integration are conceivable; i.e. storage of the hydrogen can take place centrally or district heat of a gasification unit can be used to generate electricity for liquefaction, etc. With use of the tool several configurations with different components and various integration options have been examined. Both the results of the modeling effort and an assessment of the evaluation tool will be presented. 5 refs

  6. Selecting a Sustainable Disinfection Technique for Wastewater Reuse Projects

    Directory of Open Access Journals (Sweden)

    Jorge Curiel-Esparza

    2014-09-01

    Full Text Available This paper presents an application of the Analytical Hierarchy Process (AHP by integrating a Delphi process for selecting the best sustainable disinfection technique for wastewater reuse projects. The proposed methodology provides project managers a tool to evaluate problems with multiple criteria and multiple alternatives which involve non-commeasurable decision criteria, with expert opinions playing a major role in the selection of these treatment technologies. Five disinfection techniques for wastewater reuse have been evaluated for each of the nine criteria weighted according to the opinions of consulted experts. Finally, the VIKOR method has been applied to determine a compromise solution, and to establish the stability of the results. Therefore, the expert system proposed to select the optimal disinfection alternative is a hybrid method combining the AHP with the Delphi method and the VIKOR technique, which is shown to be appropriate in realistic scenarios where multiple stakeholders are involved in the selection of a sustainable disinfection technique for wastewater reuse projects.

  7. Web Based Project Management System

    OpenAIRE

    Aadamsoo, Anne-Mai

    2010-01-01

    To increase an efficiency of a product, nowadays many web development companies are using different project management systems. A company may run a number of projects at a time, and requires input from a number of individuals, or teams for a multi level development plan, whereby a good project management system is needed. Project management systems represent a rapidly growing technology in IT industry. As the number of users, who utilize project management applications continues to grow, w...

  8. Selective serotonergic excitation of callosal projection neurons

    Directory of Open Access Journals (Sweden)

    Daniel eAvesar

    2012-03-01

    Full Text Available Serotonin (5-HT acting as a neurotransmitter in the cerebral cortex is critical for cognitive function, yet how 5-HT regulates information processing in cortical circuits is not well understood. We tested the serotonergic responsiveness of layer 5 pyramidal neurons (L5PNs of the mouse medial prefrontal cortex (mPFC, and found 3 distinct response types: long-lasting 5-HT1A (1A receptor-dependent inhibitory responses (84% of L5PNs, 5-HT2A (2A receptor-dependent excitatory responses (9%, and biphasic responses in which 2A-dependent excitation followed brief inhibition (5%. Relative to 5-HT-inhibited neurons, those excited by 5-HT had physiological properties characteristic of callosal/commissural (COM neurons that project to the contralateral cortex. We tested whether serotonergic responses in cortical pyramidal neurons are correlated with their axonal projection pattern using retrograde fluorescent labeling of COM and corticopontine-projecting (CPn neurons. 5-HT generated excitatory or biphasic responses in all 5-HT-responsive layer 5 COM neurons. Conversely, CPn neurons were universally inhibited by 5-HT. Serotonergic excitation of COM neurons was blocked by the 2A antagonist MDL 11939, while serotonergic inhibition of CPn neurons was blocked by the 1A antagonist WAY 100635, confirming a role for these two receptor subtypes in regulating pyramidal neuron activity. Selective serotonergic excitation of COM neurons was not layer-specific, as COM neurons in layer 2/3 were also selectively excited by 5-HT relative to their non-labeled pyramidal neuron neighbors. Because neocortical 2A receptors are implicated in the etiology and pathophysiology of schizophrenia, we propose that COM neurons may represent a novel cellular target for intervention in psychiatric disease.

  9. Mirror Confinement Systems: project summaries

    International Nuclear Information System (INIS)

    1980-07-01

    This report contains descriptions of the projects supported by the Mirror Confinement Systems (MCS) Division of the Office of Fusion Energy. The individual project summaries were prepared by the principal investigators, in collaboration with MCS staff office, and include objectives and milestones for each project. In addition to project summaries, statements of Division objectives and budget summaries are also provided

  10. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  11. Map projections cartographic information systems

    CERN Document Server

    Grafarend, Erik W

    2006-01-01

    In the context of Geographical Information Systems (GIS) the book offers a timely review of map projections (sphere, ellipsoid, rotational surfaces) and geodetic datum transformations. For the needs of photogrammetry, computer vision, and remote sensing space projective mappings are reviewed.

  12. Project management and Enterprise systems

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2006-01-01

    Implementing and Operating integrated Enterprise Systems are a multidimensional effort. It seriously challenges the IT supplier as well as the professional service provider client. The paper discuss these issues in a project management perspective. A framework for supporting project management...

  13. The definition, selection and implementation of a new Clinical Information System to prepare the hospital for the electronic future : an example of project-based education

    NARCIS (Netherlands)

    Spil, Antonius A.M.; van de Meeberg, Henk J.; Sikkel, Nicolaas

    The software supplier of a large hospital has been taken over. The hospital gets notice that the central hospital information system (HIS) will no longer be maintained, starting next year. This problem, not uncommon in business today, is used as a real-life case in a project-based course for first

  14. 49 CFR 268.17 - Project selection criteria.

    Science.gov (United States)

    2010-10-01

    ... criteria will govern FRA's selection of projects to receive funding under the Maglev Deployment Program. (a... are to be expected in the United States. (4) The degree to which the project will augment a Maglev... development status of the Maglev technology selected by the applicant for the project. (c) Benefits for the...

  15. PROJECT PORTFOLIO SELECTION COMPETENCES RESEARCH INUNIVERSITIES OF LITHUANIA

    OpenAIRE

    R #363;ta #268;iutien #279;; Evelina Meilien #279;; Bronius Neverauskas

    2011-01-01

    As a result of the theoretical findings, the paperdemonstrates that projectportfolio selection is crucial project management problem. Successful ProjectPortfolio management requires specific competences.Every project of projectportfolio must be evaluated according to the basedcriteria and parameters.Empirical study was based on framework matrix withfour parameters of projectportfolio selection and only two phases of projectportfolio formation. The r...

  16. The Added Value of the Project Selection Process

    Directory of Open Access Journals (Sweden)

    Adel Oueslati

    2016-06-01

    Full Text Available The project selection process comes in the first stage of the overall project management life cycle. It does have a very important impact on organization success. The present paper provides defi nitions of the basic concepts and tools related to the project selection process. It aims to stress the added value of this process for the entire organization success. The mastery of the project selection process is the right way for any organization to ensure that it will do the right project with the right resources at the right time and within the right priorities

  17. Selecting downscaled climate projections for water resource impacts and adaptation

    Science.gov (United States)

    Vidal, Jean-Philippe; Hingray, Benoît

    2015-04-01

    variables - climate change signal in temporally and spatially integrated variables - has been carefully made with respect their relevance for water resource management. This work proposes a twofold assessment of this selection approach. First, a climate validation allows checking the selection response of more extreme climate variables critical for hydrological impacts as well as spatially distributed ones. Second, a hydrological validation allows checking the selection response of streamflow variables relevant for water resource management. Findings highlight that such validations may critically help preventing misinterpretations and misuses of impact model ensemble outputs for integrated adaptation purposes. This work is part of the GICC R2D2-2050 project (Risk, water Resources and sustainable Development of the Durance catchment in 2050) and the EU FP7 COMPLEX project (Knowledge Based Climate Mitigation Systems for a Low Carbon Economy). Christierson, B. v., Vidal, J.-P., & Wade, S. D. (2012) Using UKCP09 probabilistic climate information for UK water resource planning}. J. Hydrol., {424-425}, 48-67. doi: 10.1016/j.jhydrol.2011.12.020} Lafaysse, M.; Hingray, B.; Terray, L.; Mezghani, A. & Gailhard, J. (2014) Internal variability and model uncertainty components in future hydrometeorological projections: The Alpine Durance basin. Water Resour. Res., {50}, 3317-3341. doi: 10.1002/2013WR014897 Vidal, J.-P. & Hingray, B. (2014) A framework for identifying tailored subsets of climate projections for impact and adaptation studies. EGU2014-7851

  18. Technique Selectively Represses Immune System

    Science.gov (United States)

    ... Research Matters December 3, 2012 Technique Selectively Represses Immune System Myelin (green) encases and protects nerve fibers (brown). A new technique prevents the immune system from attacking myelin in a mouse model of ...

  19. Combining AHP and DEA Methods for Selecting a Project Manager

    Directory of Open Access Journals (Sweden)

    Baruch Keren

    2014-07-01

    Full Text Available A project manager has a major influence on the success or failure of the project. A good project manager can match between the strategy and objectives of the organization and the goals of the project. Therefore, the selection of the appropriate project manager is a key factor for the success of the project. A potential project manager is judged by his or her proven performance and personal qualifications. This paper proposes a method to calculate the weighted scores and the full rank of candidates for managing a project, and to select the best of those candidates. The proposed method combines specific methodologies: the Data Envelopment Analysis (DEA and the Analytical Hierarchical Process (AHP and uses DEA Ranking Methods to enhance selection.

  20. Selected System Models

    Science.gov (United States)

    Schmidt-Eisenlohr, F.; Puñal, O.; Klagges, K.; Kirsche, M.

    Apart from the general issue of modeling the channel, the PHY and the MAC of wireless networks, there are specific modeling assumptions that are considered for different systems. In this chapter we consider three specific wireless standards and highlight modeling options for them. These are IEEE 802.11 (as example for wireless local area networks), IEEE 802.16 (as example for wireless metropolitan networks) and IEEE 802.15 (as example for body area networks). Each section on these three systems discusses also at the end a set of model implementations that are available today.

  1. A CONCEPTUAL MODEL FOR IMPROVED PROJECT SELECTION AND PRIORITISATION

    Directory of Open Access Journals (Sweden)

    P. J. Viljoen

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: Project portfolio management processes are often designed and operated as a series of stages (or project phases and gates. However, the flow of such a process is often slow, characterised by queues waiting for a gate decision and by repeated work from previous stages waiting for additional information or for re-processing. In this paper the authors propose a conceptual model that applies supply chain and constraint management principles to the project portfolio management process. An advantage of the proposed model is that it provides the ability to select and prioritise projects without undue changes to project schedules. This should result in faster flow through the system.

    AFRIKAANSE OPSOMMING: Prosesse om portefeuljes van projekte te bestuur word normaalweg ontwerp en bedryf as ’n reeks fases en hekke. Die vloei deur so ’n proses is dikwels stadig en word gekenmerk deur toue wat wag vir besluite by die hekke en ook deur herwerk van vorige fases wat wag vir verdere inligting of vir herprosessering. In hierdie artikel word ‘n konseptuele model voorgestel. Die model berus op die beginsels van voorsieningskettings sowel as van beperkingsbestuur, en bied die voordeel dat projekte geselekteer en geprioritiseer kan word sonder onnodige veranderinge aan projekskedules. Dit behoort te lei tot versnelde vloei deur die stelsel.

  2. Selection of a portfolio of R & D projects

    NARCIS (Netherlands)

    Casault, Sébastien; Groen, Arend J.; Linton, J.D.; Linton, Jonathan; Link, A.N.; Vonortas, N.S.

    2013-01-01

    While portfolios of research are increasingly discussed, a portfolio perspective is infrequently taken when selecting two or more projects. Consequently, this chapter considers the current state of knowledge in project and portfolio selection, identifies why we can and cannot apply knowledge from

  3. 7 CFR 1944.529 - Project selection.

    Science.gov (United States)

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS... administering its programs. (3) The effectiveness of the current efforts by the applicant to assist low-income...-354 office. (10) The extent to which the project will be cost effective, including but not limited to...

  4. A fuzzy hybrid approach for project manager selection

    Directory of Open Access Journals (Sweden)

    Ahmad Jafarnejad Chaghooshi

    2016-09-01

    Full Text Available Suitable project manager has a significant impact on successful accomplishment of the project. Managers should possess such skills in order to effectively cope with the competition. In this respect, selecting managers based on their skills can lead to a competitive advantage towards the achievement of organizational goals. selection of the suitable project manager can be viewed as a multi-criteria decision making (MCDM problem and an extensive evaluation of criteria, such as Technical skills, experience skills, Personal qualities and the related criteria must be considered in the selection process of project manager. The fuzzy set theory and MCDM methods appears as an essential tools to provide a decision framework that incorporates imprecise judgments and multi criteria nature of project manager selection process inherent in this process. This paper proposes the joint use of the Fuzzy DEMATEL (FDEMATEL and Fuzzy VIKOR methods for the decision-making process of selecting the most suitable managers for projects. First, with the opinions of the senior managers based on project management competency model (ICB-IPMA, all the criteria required for the selection are gathered. Then the FDEMATEL method is used to prioritize the importance of various criteria and FVIKOR used to rank the alternatives in a preferred order to select the best project managers from a number of alternatives. Next, a real case study used to illustrate the process of the proposed method. Finally, some conclusions are discussed at the end of this study.

  5. River Protection Project information systems assessment

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, A.L.

    1999-07-28

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report.

  6. River Protection Project information systems assessment

    International Nuclear Information System (INIS)

    JOHNSON, A.L.

    1999-01-01

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report

  7. Selecting a Cable System Operator.

    Science.gov (United States)

    Cable Television Information Center, Washington, DC.

    Intended to assist franchising authorities with the process of selecting a cable television system operator from franchise applicants, this document provides a framework for analysis of individual applications. Section 1 deals with various methods which can be used to select an operator. The next section covers the application form, the vehicle a…

  8. Combinatorial Optimization in Project Selection Using Genetic Algorithm

    Science.gov (United States)

    Dewi, Sari; Sawaluddin

    2018-01-01

    This paper discusses the problem of project selection in the presence of two objective functions that maximize profit and minimize cost and the existence of some limitations is limited resources availability and time available so that there is need allocation of resources in each project. These resources are human resources, machine resources, raw material resources. This is treated as a consideration to not exceed the budget that has been determined. So that can be formulated mathematics for objective function (multi-objective) with boundaries that fulfilled. To assist the project selection process, a multi-objective combinatorial optimization approach is used to obtain an optimal solution for the selection of the right project. It then described a multi-objective method of genetic algorithm as one method of multi-objective combinatorial optimization approach to simplify the project selection process in a large scope.

  9. Selecting practice management information systems.

    Science.gov (United States)

    Worley, R; Ciotti, V

    1997-01-01

    Despite enormous advances in information systems, the process by which most medical practices select them has remained virtually unchanged for decades: the request for proposal (RFP). Unfortunately, vendors have learned ways to minimize the value of RFP checklists to where purchasers now learn little about the system functionality. The authors describe a selection methodology that replaces the RFP with scored demos, reviews of vendor user manuals and mathematically structured reference checking. In a recent selection process at a major medical center, these techniques yielded greater user buy-in and favorable contract terms as well.

  10. Target selection for the HRIBF Project

    International Nuclear Information System (INIS)

    Dellwo, J.; Alton, G.D.; Batchelder, J.C.

    1994-01-01

    Experiments are in progress at the Oak Ridge National Laboratory (ORNL) which are designed to select the most appropriate target materials for generating particular radioactive ion beams for the Holifield Radioactive Ion Beam Facility (HRIBF). The 25-MV tandem accelerator is used to implant stable complements of interesting radioactive elements into refractory targets mounted in a high-temperature FEBIAD ion source which is on-line at the UNISOR facility. These experiments permit selection of the target material most appropriate for the rapid release of the element of interest, as well as realistic estimates of the efficiency of the FEBIAD source. From diffusion release data information on the release times and diffusion coefficients can be derived. Diffusion coefficients for CI implanted into and diffused from CeS and Zr 5 Si 3 and As, Br, and Se implanted into and diffused from Zr 5 Ge 3 have been derived from the resulting intensity versus time profiles

  11. Selection Method for COTS Systems

    DEFF Research Database (Denmark)

    Hedman, Jonas; Andersson, Bo

    2014-01-01

    feature behind the method is that improved understanding of organizational ‘ends’ or goals should govern the selection of a COTS system. This can also be expressed as a match or fit between ‘ends’ (e.g. improved organizational effectiveness) and ‘means’ (e.g. implementing COTS systems). This way...

  12. Decision support system to select cover systems

    International Nuclear Information System (INIS)

    Bostick, K.V.

    1995-01-01

    The objective of this technology is to provide risk managers with a defensible, objective way to select capping alternatives for remediating radioactive and mixed waste landfills. The process of selecting containment cover technologies for mixed waste landfills requires consideration of many complex and interrelated technical, regulatory, and economic issues. A Decision Support System (DSS) is needed to integrate the knowledge of experts from scientific, engineering, and management disciplines to help in selecting the best capping practice for the site

  13. Selection of projects in the regional energy planning

    International Nuclear Information System (INIS)

    Ramirez P, R.; Navas M, F.

    1993-01-01

    The processes of regional energy planning have changed vastly in the last years and it will continue changing in the future for the new norm of the State. This work tries to show the use of systematic tools in the selection of regional energy projects. It discusses a methodology of selection of projects based on a multivariate technical. It is applied in the Southwestern region of Colombia and both selection and priority results are obtained. The designed methodology allows to make the selection of projects in an automatic way with a software designed for such an end. In the case of Southwestern it arrives to a briefcase of projects for an energy plan and made for other races

  14. Selection Process of ERP Systems

    OpenAIRE

    Molnár, Bálint; Szabó, Gyula; Benczúr, András

    2013-01-01

    Background: The application and introduction of ERP systems have become a central issue for management and operation of enterprises. The competition on market enforces the improvement and optimization of business processes of enterprises to increase their efficiency, effectiveness, and to manage better the resources outside the company. The primary task of ERP systems is to achieve the before-mentioned objectives. Objective: The selection of a particular ERP system has a decisive effect on th...

  15. Engineered Geothermal System Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Petty, Susan

    2014-06-19

    In June 2009, AltaRock Energy began field work on a project supported by the U.S. Department of Energy entitled “Use of Multiple Stimulations to Improve Economics of Engineered Geothermal Systems in Shallow High Temperature Intrusives.” The goal of the project was to develop an Engineered Geothermal System (EGS) in the portion of The Geysers geothermal field operated by the Northern California Power Agency (NCPA). The project encountered several problems while deepening Well E-7 which culminated in the suspension of field activities in September 2009. Some of the problems encountered are particular to The Geysers area, while others might be encountered in any geothermal field, and they might be avoided in future operations.

  16. METHODS OF SELECTING THE EFFECTIVE MODELS OF BUILDINGS REPROFILING PROJECTS

    Directory of Open Access Journals (Sweden)

    Александр Иванович МЕНЕЙЛЮК

    2016-02-01

    Full Text Available The article highlights the important task of project management in reprofiling of buildings. It is expedient to pay attention to selecting effective engineering solutions to reduce the duration and cost reduction at the project management in the construction industry. This article presents a methodology for the selection of efficient organizational and technical solutions for the reconstruction of buildings reprofiling. The method is based on a compilation of project variants in the program Microsoft Project and experimental statistical analysis using the program COMPEX. The introduction of this technique in the realigning of buildings allows choosing efficient models of projects, depending on the given constraints. Also, this technique can be used for various construction projects.

  17. The Utility of Geographical Information Systems (GIS) in Systems-Oriented Obesity Intervention Projects: The Selection of Comparable Study Sites for a Quasi-Experimental Intervention Design—TX CORD

    Science.gov (United States)

    Byars, Allison; Byrd-Williams, Courtney; Sharma, Shreela V.; Durand, Casey; Hoelscher, Deanna M.; Butte, Nancy F.; Kelder, Steven H.

    2015-01-01

    Abstract Background: The Texas Childhood Obesity Research Demonstration project (TX CORD) uses a systems-oriented approach to address obesity that includes individual and family interventions, community-level action, as well as environmental and policy initiatives. Given that randomization is seldom possible in community-level intervention studies, TX CORD uses a quasi-experimental design. Comparable intervention and comparison study sites are needed to address internal validity bias. Methods: TX CORD was designed to be implemented in low-income, ethnically diverse communities in Austin and Houston, Texas. A three-stage Geographical Information System (GIS) methodology was used to establish and ascertain the comparability of the intervention and comparison study sites. Census tract (stage 1) and school (stage 2) data were used to identify spatially exclusive geographic areas that were comparable. In stage 3, study sites were compared on demographic characteristics, socioeconomic status (SES), food assets, and physical activity (PA) assets. Student's t-test was used to examine significant differences between the selected sites. Results: The methodology that was used resulted in the selection of catchment areas with demographic and socioeconomic characteristics that fit the target population: ethnically diverse population; lower-median household income; and lower home ownership rates. Additionally, the intervention and comparison sites were statistically comparable on demographic and SES variables, as well as food assets and PA assets. Conclusions: This GIS approach can provide researchers, program evaluators, and policy makers with useful tools for both research and practice. Area-level information that allows for robust understanding of communities can enhance analytical procedures in community health research and offer significant contributions in terms of community assessment and engagement. PMID:25587670

  18. The utility of Geographical Information Systems (GIS) in systems-oriented obesity intervention projects: the selection of comparable study sites for a quasi-experimental intervention design--TX CORD.

    Science.gov (United States)

    Oluyomi, Abiodun O; Byars, Allison; Byrd-Williams, Courtney; Sharma, Shreela V; Durand, Casey; Hoelscher, Deanna M; Butte, Nancy F; Kelder, Steven H

    2015-02-01

    The Texas Childhood Obesity Research Demonstration project (TX CORD) uses a systems-oriented approach to address obesity that includes individual and family interventions, community-level action, as well as environmental and policy initiatives. Given that randomization is seldom possible in community-level intervention studies, TX CORD uses a quasi-experimental design. Comparable intervention and comparison study sites are needed to address internal validity bias. TX CORD was designed to be implemented in low-income, ethnically diverse communities in Austin and Houston, Texas. A three-stage Geographical Information System (GIS) methodology was used to establish and ascertain the comparability of the intervention and comparison study sites. Census tract (stage 1) and school (stage 2) data were used to identify spatially exclusive geographic areas that were comparable. In stage 3, study sites were compared on demographic characteristics, socioeconomic status (SES), food assets, and physical activity (PA) assets. Student's t-test was used to examine significant differences between the selected sites. The methodology that was used resulted in the selection of catchment areas with demographic and socioeconomic characteristics that fit the target population: ethnically diverse population; lower-median household income; and lower home ownership rates. Additionally, the intervention and comparison sites were statistically comparable on demographic and SES variables, as well as food assets and PA assets. This GIS approach can provide researchers, program evaluators, and policy makers with useful tools for both research and practice. Area-level information that allows for robust understanding of communities can enhance analytical procedures in community health research and offer significant contributions in terms of community assessment and engagement.

  19. The process of selecting technology development projects: a practical framework

    NARCIS (Netherlands)

    Herps, Joost M.J.; van Mal, Herman H.; Halman, Johannes I.M.; Martens, Jack H.M.; Borsboom, Ron H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  20. The process of selecting technology development projects : a practical framework

    NARCIS (Netherlands)

    Herps, J.M.J.; Mal, van H.H.; Halman, J.I.M.; Martens, J.H.M.; Borsboom, R.H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  1. Understanding the selection processes of public research projects

    NARCIS (Netherlands)

    Materia, V.C.; Pascucci, S.; Kolympiris, C.

    2015-01-01

    This paper analyses factors that affect the funding of agricultural research projects by regional governments and other regional public authorities. We study the selection process of agricultural research projects funded by the emilia Romagna regional government in Italy, which follows funding

  2. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  3. Case studies of selected Project "Flash" events

    Directory of Open Access Journals (Sweden)

    K. A. Nicolaides

    2009-03-01

    Full Text Available Flooding is a consequence of the prevailing meteorological situation, the intensity and duration of precipitation, geomorphology, human activities over a geographical region and other factors. Floods result in damage and destruction of infrastructure and private property and, in some cases, in fatalities. Flash floods are sudden and quite localized in extend, characterized by excessive amounts of rainfall within a short period of time and are distinguished from other floods by their degree of severity. The broader knowledge concerning flash floods is useful for the better understanding of the underlying thermodynamic and dynamic mechanisms, as well as the associated physical processes. The wider understanding of flashfloods can form part of an integrated system for short and very short forecasting of these events. In the present study, the synoptic, dynamic and thermodynamic conditions during the development of a baroclinic depression which affected the area of Cyprus on 6 November 2005 are studied. The depression was associated with extreme weather phenomena, such as thunderstorms, a water spout and high precipitation accumulations. The results indicate the importance of the dynamic parameters in the system's development and the thermodynamic analysis has shown the convective potential of the atmosphere.

  4. Expert system application education project

    Science.gov (United States)

    Gonzelez, Avelino J.; Ragusa, James M.

    1988-01-01

    Artificial intelligence (AI) technology, and in particular expert systems, has shown potential applicability in many areas of operation at the Kennedy Space Center (KSC). In an era of limited resources, the early identification of good expert system applications, and their segregation from inappropriate ones can result in a more efficient use of available NASA resources. On the other hand, the education of students in a highly technical area such as AI requires an extensive hands-on effort. The nature of expert systems is such that proper sample applications for the educational process are difficult to find. A pilot project between NASA-KSC and the University of Central Florida which was designed to simultaneously address the needs of both institutions at a minimum cost. This project, referred to as Expert Systems Prototype Training Project (ESPTP), provided NASA with relatively inexpensive development of initial prototype versions of certain applications. University students likewise benefit by having expertise on a non-trivial problem accessible to them at no cost. Such expertise is indispensible in a hands-on training approach to developing expert systems.

  5. EPRtm project experience: selection of partners and supply chain

    International Nuclear Information System (INIS)

    Lorenzo, D. de

    2012-01-01

    With 4 EPR T M units under construction, the new plants to be built in the following years will benefit from the return on experience of the work already performed. The knowledge about licensing processes, detail engineering, supply chain, logistics and on-site work gathered from the Olkiluoto 3 and Flamanville 3 projects has already been used in the Taishan 1 and 2 project, resulting in a project that is on schedule and on budget. This article will show how the advantage of such broad experience gained will be used to benefit future projects to ensure certainty of completion, leaving few and limited unresolved issues even before the beginning of the project. Several areas that are not usually tackled when speaking of a New Build project will be covered by this text from the point of view of a nuclear vendor: Project Partnership Selection and the Gate Review Process applied by AREVA in the supply chain of the main components. (Author)

  6. NPD project portfolio selection using reinvestment strategy in competitive environment

    Directory of Open Access Journals (Sweden)

    Alireza Ghassemi

    2018-01-01

    Full Text Available This study aims to design a new model for selecting most fitting new product development projects in a pool of projects. To catch the best model, we assume new products will be introduced to the competitive markets. Also, we suppose the revenue yielded by completed projects can be reinvested on implementation of other projects. Other sources of financing are borrowing loans from banks and initial capital of the firm. These limited resources determine most evaluated projects to be performed. Several types of interactions among different projects are considered to make the chosen projects more like a portfolio. In addition, some numerical examples from the real world are provided to demonstrate the applicability of the proposed model. These examples show how the particular considerations in the suggested model affect the results.

  7. Site selection for controversial projects: reflections on the MRS experience

    International Nuclear Information System (INIS)

    Sigmon, E.B.; Marland, G.

    1987-01-01

    Projects for waste management, power production, and a host of other socially useful functions frequently falter because of local opposition. Students of the siting dilemma have prescribed accommodation of local interests through negotiation and compensation, but they offer little advice on the site selection itself. The negotiated compensation approach to siting frequently fails because localities refuse to negotiate. The authors argue that methods of site selection and developers' initial stance toward local communities affect communities' propensity to negotiate. Site selection strategies and their influence on project acceptability are examined, using the Department of Energy's Monitored Retrievable Storage proposal as a point of departure. 14 refs

  8. Production Systems and Supplier Selection

    DEFF Research Database (Denmark)

    Pedraza-Acosta, Isabel; Pilkington, Alan; Barnes, David

    2016-01-01

    strategic stamping suppliers. Findings: Our contribution is the multi-phased production and product innovation process. This is an advance from traditional supplier selection and also an extension of ideas of supplier-located product development as it includes production system development, and complements...

  9. Applying a Hybrid MCDM Model for Six Sigma Project Selection

    Directory of Open Access Journals (Sweden)

    Fu-Kwun Wang

    2014-01-01

    Full Text Available Six Sigma is a project-driven methodology; the projects that provide the maximum financial benefits and other impacts to the organization must be prioritized. Project selection (PS is a type of multiple criteria decision making (MCDM problem. In this study, we present a hybrid MCDM model combining the decision-making trial and evaluation laboratory (DEMATEL technique, analytic network process (ANP, and the VIKOR method to evaluate and improve Six Sigma projects for reducing performance gaps in each criterion and dimension. We consider the film printing industry of Taiwan as an empirical case. The results show that our study not only can use the best project selection, but can also be used to analyze the gaps between existing performance values and aspiration levels for improving the gaps in each dimension and criterion based on the influential network relation map.

  10. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  11. Study on the Selection of Equipment Suppliers for Wind Power Generation EPC Project

    Science.gov (United States)

    Yang, Yuanyue; Li, Huimin

    2017-12-01

    In the EPC project, the purchase cost of equipments accounted for about 60% of the total project cost, thus, the selection of equipment suppliers has an important influence on the EPC project. This paper, took EPC project for the phase I engineering of Guizhou Huaxi Yunding wind power plant as research background, constructed the evaluation index system for the selection of equipment suppliers for wind power generation EPC project from multiple perspectives, and introduced matter-element extension evaluation model to evaluate the selection of equipment suppliers for this project from the qualitative and quantitative point of view. The result is consistent with the actual situation, which verifies the validity and operability of this method.

  12. Business System Planning Project, Alternatives Analysis

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    The CHG Chief Information Officer (CIO) requested a study of alternatives to the current business system computing environment. This Business Systems Planning (BSP) Project Alternatives Analysis document presents an analysis of the current Project Controls, Work Management, and Business Management systems environment and alternative solutions that support the business functions. The project team has collected requirements and priorities from stakeholders in each business area and documented them in the BSP System Requirements Specification (SRS), RPP-6297. The alternatives analysis process identifies and measures possible solutions in each of the business process areas against the requirements as documented in the SRS. The team gathered input from both internal and external sources to identify and grade the possible solutions. This document captures the results of that activity and recommends a suite of software products. This study was to select the best product based on how well the product met the requirements, not to determine the platform or hardware environment that would be used. Additional analysis documentation can be found in BSP project files

  13. Proposed Project Selection Method for Human Support Research and Technology Development (HSR&TD)

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of HSR&TD is to deliver human support technologies to the Exploration Systems Mission Directorate (ESMD) that will be selected for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are acceptable. HSR&TD must select an may of technology development projects, guide them, and either terminate or continue them, so as to maximize the resulting number of usable advanced human support technologies. This paper proposes an effective project scoring methodology to support managing the HSR&TD project portfolio. Researchers strongly disagree as to what are the best technology project selection methods, or even if there are any proven ones. Technology development is risky and outstanding achievements are rare and unpredictable. There is no simple formula for success. Organizations that are satisfied with their project selection approach typically use a mix of financial, strategic, and scoring methods in an open, established, explicit, formal process. This approach helps to build consensus and develop management insight. It encourages better project proposals by clarifying the desired project attributes. We propose a project scoring technique based on a method previously used in a federal laboratory and supported by recent research. Projects are ranked by their perceived relevance, risk, and return - a new 3 R's. Relevance is the degree to which the project objective supports the HSR&TD goal of developing usable advanced human support technologies. Risk is the estimated probability that the project will achieve its specific objective. Return is the reduction in mission life cycle cost obtained if the project is successful. If the project objective technology performs a new function with no current cost, its return is the estimated cash value of performing the new function. The proposed project selection scoring method includes definitions of the criteria, a project evaluation

  14. RIVER PROTECTION PROJECT SYSTEM PLAN

    Energy Technology Data Exchange (ETDEWEB)

    CERTA PJ

    2008-07-10

    management and treatment facilities, (8) Developing and implementing technical solutions to mitigate the impact from substantial1y increased estimates of Na added during the pretreatment of the tank waste solids, This involves a combination of: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, or (4) accepting an increase in mission duration, ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks, Key elements of the implementation of this strategy are included within the scope of the Tank Operations Contract, currently in procurement Since 2003, the ORP has conducted over 30 design oversight assessments of the Waste Treatment and Immobilization Plant (WTP). The estimated cost at completion has increased and the schedule for construction and commissioning of the WTP has extended, The DOE, Office of Environmental Management (EM), sanctioned a comprehensive review of the WTP flowsheet, focusing on throughput. In 2005, the TFC completed interim stabilization of the SSTs and as of March 2007, has completed the retrieval of seven selected SSTs. Demonstration of supplemental treatment technologies continues. The ongoing tank waste retrieval experience, progress with supplemental treatment technologies, and changes in WTP schedule led to the FY 2007 TFC baseline submittal in November 2006. The TFC baseline submittal was developed before the WTP schedule was fully understood and approved by ORP, and therefore reflects an earlier start date for the WTP facilities. This System Plan is aligned with the current WTP schedule with hot commissioning beginning in 2018 and full operations beginning in 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its

  15. RIVER PROTECTION PROJECT SYSTEM PLAN

    International Nuclear Information System (INIS)

    CERTA PJ

    2008-01-01

    management and treatment facilities, (8) Developing and implementing technical solutions to mitigate the impact from substantial1y increased estimates of Na added during the pretreatment of the tank waste solids, This involves a combination of: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, or (4) accepting an increase in mission duration, ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks, Key elements of the implementation of this strategy are included within the scope of the Tank Operations Contract, currently in procurement Since 2003, the ORP has conducted over 30 design oversight assessments of the Waste Treatment and Immobilization Plant (WTP). The estimated cost at completion has increased and the schedule for construction and commissioning of the WTP has extended, The DOE, Office of Environmental Management (EM), sanctioned a comprehensive review of the WTP flowsheet, focusing on throughput. In 2005, the TFC completed interim stabilization of the SSTs and as of March 2007, has completed the retrieval of seven selected SSTs. Demonstration of supplemental treatment technologies continues. The ongoing tank waste retrieval experience, progress with supplemental treatment technologies, and changes in WTP schedule led to the FY 2007 TFC baseline submittal in November 2006. The TFC baseline submittal was developed before the WTP schedule was fully understood and approved by ORP, and therefore reflects an earlier start date for the WTP facilities. This System Plan is aligned with the current WTP schedule with hot commissioning beginning in 2018 and full operations beginning in 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its

  16. Space Projects: Improvements Needed in Selecting Future Projects for Private Financing

    Science.gov (United States)

    1990-01-01

    The Office of Management and Budget (OMB) and NASA jointly selected seven projects for commercialization to reduce NASA's fiscal year 1990 budget request and to help achieve the goal of increasing private sector involvement in space. However, the efforts to privately finance these seven projects did not increase the commercial sector's involvement in space to the extent desired. The General Accounting Office (GAO) determined that the projects selected were not a fair test of the potential of increasing commercial investment in space at an acceptable cost to the government, primarily because the projects were not properly screened. That is, neither their suitability for commercialization nor the economic consequences of seeking private financing for them were adequately evaluated before selection. Evaluations and market tests done after selection showed that most of the projects were not viable candidates for private financing. GAO concluded that projects should not be removed from NASA's budget for commercial development until after careful screening has been done to determine whether adequate commercial demand exists, development risks are commercially acceptable and private financing is found or judged to be highly likely, and the cost effectiveness of such a decision is acceptable. Premature removal of projects from NASA's budget ultimately can cause project delays and increased costs when unsuccessful commercialization candidates must be returned to the budget. NASA also needs to ensure appropriate comparisons of government and private financing options for future commercialization projects.

  17. Selecting Large Portfolios of Social Projects in Public Organizations

    Directory of Open Access Journals (Sweden)

    Igor Litvinchev

    2014-01-01

    Full Text Available We address the portfolio selection of social projects in public organizations considering interdependencies (synergies affecting project funds requirements and tasks. A mixed integer linear programming model is proposed incorporating the most relevant aspects of the problem found in the literature. The model supports both complete (all or nothing and partial (a certain amount from a given interval of funding resource allocation policies. Numerical results for large-scale problem instances are presented.

  18. Six Sigma Project Selection Using Fuzzy TOPSIS Decision Making Approach

    Directory of Open Access Journals (Sweden)

    Rajeev Rathi

    2015-05-01

    Full Text Available Six Sigma is considered as a logical business strategy that attempts to identify and eliminate the defects or failures for improving the quality of product and processes. A decision on project selection in Six Sigma is always very critical; it plays a key role in successful implementation of Six Sigma. Selection of a right Six Sigma project is essentially important for an automotive company because it greatly influences the manufacturing costs. This paper discusses an approach for right Six Sigma project selection at an automotive industry using fuzzy logic based TOPSIS method. The fuzzy TOPSIS is a well recognized tool to undertake the fuzziness of the data involved in choosing the right preferences. In this context, evaluation criteria have been designed for selection of best alternative. The weights of evaluation criteria are calculated by using the MDL (modified digital logic method and final ranking is calculated through priority index obtained by using fuzzy TOPSIS method. In the selected case study, this approach has rightly helped to identify the right project for implementing Six Sigma for achieving improvement in productivity.

  19. Real Property Project Tracking System (RPPTS)

    Data.gov (United States)

    Department of Veterans Affairs — The Real Property Project Tracking System (RPPTS), formerly known as the Lease/Project Tracking (LEASE) database, contains information about lease and land projects...

  20. Exploring project selection behavior of academic scientists in India

    OpenAIRE

    Anju Chawla

    2007-01-01

    This study is based on retrospective accounts of a stratified sample of about 1,100 academic scien-tists in India on the criteria actually used by them in the choice of research projects. A basic objective is to examine the effects of contextual factors such as academic rank, institutional and disciplinary setting, and sources of research funds on the choice of research projects. A struc-tured questionnaire was used to tap the criteria for project selection. The items were factor-analyzed and...

  1. Exploration Medical System Demonstration Project

    Science.gov (United States)

    Chin, D. A.; McGrath, T. L.; Reyna, B.; Watkins, S. D.

    2011-01-01

    A near-Earth Asteroid (NEA) mission will present significant new challenges including hazards to crew health created by exploring a beyond low earth orbit destination, traversing the terrain of asteroid surfaces, and the effects of variable gravity environments. Limited communications with ground-based personnel for diagnosis and consultation of medical events require increased crew autonomy when diagnosing conditions, creating treatment plans, and executing procedures. Scope: The Exploration Medical System Demonstration (EMSD) project will be a test bed on the International Space Station (ISS) to show an end-to-end medical system assisting the Crew Medical Officers (CMO) in optimizing medical care delivery and medical data management during a mission. NEA medical care challenges include resource and resupply constraints limiting the extent to which medical conditions can be treated, inability to evacuate to Earth during many mission phases, and rendering of medical care by a non-clinician. The system demonstrates the integration of medical technologies and medical informatics tools for managing evidence and decision making. Project Objectives: The objectives of the EMSD project are to: a) Reduce and possibly eliminate the time required for a crewmember and ground personnel to manage medical data from one application to another. b) Demonstrate crewmember's ability to access medical data/information via a software solution to assist/aid in the treatment of a medical condition. c) Develop a common data management architecture that can be ubiquitously used to automate repetitive data collection, management, and communications tasks for all crew health and life sciences activities. d) Develop a common data management architecture that allows for scalability, extensibility, and interoperability of data sources and data users. e) Lower total cost of ownership for development and sustainment of peripheral hardware and software that use EMSD for data management f) Provide

  2. Project Selection in the Design Studio: Absence of Learning Environments

    Science.gov (United States)

    Basa, Inci

    2010-01-01

    Project selection is an essential matter of design teaching. Based on observations of a specific curriculum, the author claims that a wide repertoire of subjects including offices, restaurants, hotels, and other public places are used to prepare design students, but that schools and other "learning environments/ schools" are similarly…

  3. The utility of Geographical Information Systems (GIS) in systems-oriented obesity intervention projects: The selection of comparable study sites for a quasi-experimental intervention design--TX CORD

    Science.gov (United States)

    The Texas Childhood Obesity Research Demonstration project (TX CORD) uses a systems-oriented approach to address obesity that includes individual and family interventions, community-level action, as well as environmental and policy initiatives. Given that randomization is seldom possible in communit...

  4. Procurement selection criteria for projects in the public sector: evidence from Nigeria

    Directory of Open Access Journals (Sweden)

    Richard Ajayi Jimoh

    2016-12-01

    Full Text Available The selection of suitable procurement practice for construction projects is a very complex and demanding tasks for stakeholders in the construction industry. In spite of the overabundance of techniques and tools accessible to the stakeholders in selecting an appropriate procurement method, clients are faced with the decision as to which of the selection criteria can be adopted for a given construction project to achieve project goals and objectives. This paper focused on evaluating the existing procurement methods being practised in the Nigerian construction industry with a view to identifying and establishing the parameters for selection that will improve contract delivery systems. In this research, quantitative approach was used to collect data from 420 contractors, consultants and clients based in the Federal Capital Territory, Abuja where large numbers of building projects are being procured. The findings revealed six most commonly considered criteria and deduced that, the quality, cost and duration of the project determines the type of procurement method to adopt. It is therefore stated that in selecting any particular procurement method for building construction projects, the complexity of such project should be clearly defined and the other performance indicators be given adequate consideration for a successful project delivery that will enhance the achievement of the client’s goal.

  5. Selecting Map Projections in Minimizing Area Distortions in GIS Applications

    Directory of Open Access Journals (Sweden)

    Ahmet Kaya

    2008-12-01

    Full Text Available Varioussoftware for Geographical Information Systems (GISs have been developed and used in many different engineering projects. In GIS applications, map coverage is important in terms of performing reliable and meaningful queries. Map projections can be conformal, equal-area and equidistant. The goal of an application plays an important role in choosing one of those projections. Choosing the equal-area projection for an application in which area information is used (forestry, agriculture, ecosystem etc reduces the amount of distortion on the area, but many users using GIS ignore this fact and continue to use applications with present map sheets no matter in what map projection it is. For example, extracting area information from data whose country system’s map sheet is in conformal projection is relatively more distorted, compared to an equal-area projection one. The goal of this study is to make the best decision in choosing the most proper equal-area projection among the choices provided by ArcGIS 9.0, which is a popular GIS software package, and making a comparison on area errors when conformal projection is used. In this study, the area of parcels chosen in three different regions and geographic coordinates and whose sizes vary between 0.01 to 1,000,000 ha are calculated according to Transversal Mercator (TM, 3°, Universal Transversal Mercator (UTM, 6° and 14 different equal-area projections existing in the ArcGIS 9.0 GIS software package. The parcel areas calculated with geographical coordinates are accepted as definite. The difference between the sizes calculated according to projection coordinates and real sizes of the parcels are determined. Consequently, the appropriate projections are decided for the areas smaller and equal than 1,000 ha and greater than 1,000 ha in the GIS software package.

  6. System design projects for undergraduate design education

    Science.gov (United States)

    Batill, S. M.; Pinkelman, J.

    1993-01-01

    Design education has received considerable in the recent past. This paper is intended to address one aspect of undergraduate design education and that is the selection and development of the design project for a capstone design course. Specific goals for a capstone design course are presented and their influence on the project selection are discussed. The evolution of a series of projects based upon the design of remotely piloted aircraft is presented along with students' perspective on the capstone experience.

  7. The GEM Detector projective alignment simulation system

    International Nuclear Information System (INIS)

    Wuest, C.R.; Belser, F.C.; Holdener, F.R.; Roeben, M.D.; Paradiso, J.A.; Mitselmakher, G.; Ostapchuk, A.; Pier-Amory, J.

    1993-01-01

    Precision position knowledge (< 25 microns RMS) of the GEM Detector muon system at the Superconducting Super Collider Laboratory (SSCL) is an important physics requirement necessary to minimize sagitta error in detecting and tracking high energy muons that are deflected by the magnetic field within the GEM Detector. To validate the concept of the sagitta correction function determined by projective alignment of the muon detectors (Cathode Strip Chambers or CSCs), the basis of the proposed GEM alignment scheme, a facility, called the ''Alignment Test Stand'' (ATS), is being constructed. This system simulates the environment that the CSCs and chamber alignment systems are expected to experience in the GEM Detector, albeit without the 0.8 T magnetic field and radiation environment. The ATS experimental program will allow systematic study and characterization of the projective alignment approach, as well as general mechanical engineering of muon chamber mounting concepts, positioning systems and study of the mechanical behavior of the proposed 6 layer CSCs. The ATS will consist of a stable local coordinate system in which mock-ups of muon chambers (i.e., non-working mechanical analogs, representing the three superlayers of a selected barrel and endcap alignment tower) are implemented, together with a sufficient number of alignment monitors to overdetermine the sagitta correction function, providing a self-consistency check. This paper describes the approach to be used for the alignment of the GEM muon system, the design of the ATS, and the experiments to be conducted using the ATS

  8. Essentials of Project and Systems Engineering Management

    CERN Document Server

    Eisner, Howard S

    2008-01-01

    The Third Edition of Essentials of Project and Systems Engineering Management enables readers to manage the design, development, and engineering of systems effectively and efficiently. The book both defines and describes the essentials of project and systems engineering management and, moreover, shows the critical relationship and interconnection between project management and systems engineering. The author's comprehensive presentation has proven successful in enabling both engineers and project managers to understand their roles, collaborate, and quickly grasp and apply all the basic princip

  9. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    Science.gov (United States)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of

  10. Map projections cartographic information systems

    CERN Document Server

    Grafarend, Erik W; Syffus, Rainer

    2014-01-01

    This book offers a timely review of map projections including sphere, ellipsoid, rotational surfaces, and geodetic datum transformations. Coverage includes computer vision, and remote sensing space projective mappings in photogrammetry.

  11. Project as a System and its Management

    Directory of Open Access Journals (Sweden)

    Jiří Skalický

    2017-06-01

    Full Text Available The contribution aims to describe project as a system, to define project control goal and strategy, control variables and their relationships. Three common control variables represented by the project triangle, are extended by two other important variables – project risk and quality. The control system consists of two components: social one – project manager and project team – and technical one – project dynamic simulation model as a decision making support of project manager in project milestones. In the project planning phase, the project baseline with planned controlled variables is created. In milestones after project launch, the actual values of these variables are measured. If the actual values deviate from planned ones, corrective actions are proposed and new baseline for the following control interval is created. Project plan takes into account the actual project progress and optimum corrective actions are determined by simulation, respecting control strategy and availability of resources. The contribution presents list of references to articles dealing with project as a system and its simulation. In most cases, they refer to the project control using the Earned Value Management method and its derivatives. Using of the dynamic simulation model for project monitoring and control, suggested in this contribution, presents a novel approach. The proposed model can serve as departure point to future research of authors and for development of appropriate and applicable tool.

  12. `95 computer system operation project

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Taek; Lee, Hae Cho; Park, Soo Jin; Kim, Hee Kyung; Lee, Ho Yeun; Lee, Sung Kyu; Choi, Mi Kyung [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-12-01

    This report describes overall project works related to the operation of mainframe computers, the management of nuclear computer codes and the project of nuclear computer code conversion. The results of the project are as follows ; 1. The operation and maintenance of the three mainframe computers and other utilities. 2. The management of the nuclear computer codes. 3. The finishing of the computer codes conversion project. 26 tabs., 5 figs., 17 refs. (Author) .new.

  13. '95 computer system operation project

    International Nuclear Information System (INIS)

    Kim, Young Taek; Lee, Hae Cho; Park, Soo Jin; Kim, Hee Kyung; Lee, Ho Yeun; Lee, Sung Kyu; Choi, Mi Kyung

    1995-12-01

    This report describes overall project works related to the operation of mainframe computers, the management of nuclear computer codes and the project of nuclear computer code conversion. The results of the project are as follows ; 1. The operation and maintenance of the three mainframe computers and other utilities. 2. The management of the nuclear computer codes. 3. The finishing of the computer codes conversion project. 26 tabs., 5 figs., 17 refs. (Author) .new

  14. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Down-selection of one or more Maglev projects for... Procedures For Financial Assistance § 268.21 Down-selection of one or more Maglev projects for further study... completion of Phase III of the Maglev Deployment Program, FRA will down-select one or more projects to...

  15. NASA: Assessments of Selected Large-Scale Projects

    Science.gov (United States)

    2011-03-01

    REPORT DATE MAR 2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE Assessments Of Selected Large-Scale Projects...Volatile EvolutioN MEP Mars Exploration Program MIB Mishap Investigation Board MMRTG Multi Mission Radioisotope Thermoelectric Generator MMS Magnetospheric...probes designed to explore the Martian surface, to satellites equipped with advanced sensors to study the earth , to telescopes intended to explore the

  16. Web-based Project Reporting System

    Data.gov (United States)

    US Agency for International Development — Web-PRS is a web-based system that captures financial information and project status information that is sortable by geographical location, pillar, project type and...

  17. Minimizing Project Cost by Integrating Subcontractor Selection Decisions with Scheduling

    Science.gov (United States)

    Biruk, Sławomir; Jaśkowski, Piotr; Czarnigowska, Agata

    2017-10-01

    Subcontracting has been a worldwide practice in the construction industry. It enables the construction enterprises to focus on their core competences and, at the same time, it makes complex project possible to be delivered. Since general contractors bear full responsibility for the works carried out by their subcontractors, it is their task and their risk to select a right subcontractor for a particular work. Although subcontractor management has been admitted to significantly affect the construction project’s performance, current practices and past research deal with subcontractor management and scheduling separately. The proposed model aims to support subcontracting decisions by integrating subcontractor selection with scheduling to enable the general contractor to select the optimal combination of subcontractors and own crews for all work packages of the project. The model allows for the interactions between the subcontractors and their impacts on the overall project performance in terms of cost and, indirectly, time and quality. The model is intended to be used at the general contractor’s bid preparation stage. The authors claim that the subcontracting decisions should be taken in a two-stage process. The first stage is a prequalification - provision of a short list of capable and reliable subcontractors; this stage is not the focus of the paper. The resulting pool of available resources is divided into two subsets: subcontractors, and general contractor’s in-house crews. Once it has been defined, the next stage is to assign them to the work packages that, bound by fixed precedence constraints, form the project’s network diagram. Each package is possible to be delivered by the general contractor’s crew or some of the potential subcontractors, at a specific time and cost. Particular crews and subcontractors can be contracted more than one package, but not at the same time. Other constraints include the predefined project completion date (the project is

  18. Systems approach to project risk management

    Energy Technology Data Exchange (ETDEWEB)

    Kindinger, J. P. (John P.)

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  19. Decisive management in selecting locations for development of construction projects

    Science.gov (United States)

    Szafranko, E.; Pawłowicz, J. A.

    2017-08-01

    The location of an investment project is one of the most important decisions in the construction and land development business. The shape of a new building and aspects of its future use depend on making a good choice of a land plot where it will be constructed. There are many characteristics involved descriptions of land available for development. On the one hand, different buildings (with different envisaged use) fit differently to a given location. Residential homes, for example, require a location which will ensure a peaceful lifestyle, with places for walks and recreation, situated in a relatively quite setting. On the other hand, close proximity to schools, shops or a health clinic is another important consideration. Industrial buildings should be localized so as not to be a nuisance to others, and their location should facilitate efficient transport of raw materials and ready products. Yet other requirements are defined for public buildings. It is therefore evident that the characteristics included in an evaluation of the location of a planned building can be highly diverse and their diversity makes the evaluation difficult. Selection of a location can be supported by a variety of methods. For instance, an evaluation can rely on assigning points which indicate the fulfillment of certain criteria. This approach generates a complex evaluation in the form of tables and maps of usefulness. Another possibility is to make an assessment of the criteria that a given land parcels should satisfy in order to develop a specific type of a building. Having combined these two sets of information, we can create a system or a model for the management of land resources, which will easily help to support decision making processes pertaining to the choice of a location. This article shows a model approach for a specific building.

  20. SELECTING WORKING TEAMS FOR INFORMATION TECHNOLOGY OUTSOURCING PROJECTS THROUGH A COMBINATION OF METHODOLOGIES

    Directory of Open Access Journals (Sweden)

    María Alejandra Castellini

    Full Text Available ABSTRACT This paper deals with a problem that Information Technology outsourcing suppliers generally face when selecting a working team technically capable for specific roles in software development projects. A combination of methodologies, interactively integrated, is proposed. They are Soft System Methodology to structure the problem, Repertory Grid for individual interviews and elicitation of the selection criteria, DRV Processes to assess the candidates and to generate knowledge and consensus on the selection process and Linear Programming to assign people to each position. This multimethodology allowed finding a more comprehensive solution than that initially requested by the company, since it helped to establish the necessary transformations for the selection model to operate in the right way, set the competencies to be considered as selection criteria, develop a consensus estimate of the weighted criteria, and award global values to candidates, optimizing the assignment of roles in the group for the project.

  1. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  2. A project-based geoscience curriculum: select examples

    Science.gov (United States)

    Brown, L. M.; Kelso, P. R.; White, R. J.; Rexroad, C. B.

    2007-12-01

    Principles of constructivist educational philosophy serve as a foundation for the recently completed National Science Foundation sponsored undergraduate curricular revision undertaken by the Geology Department of Lake Superior State University. We integrate lecture and laboratory sessions utilizing active learning strategies that focus on real-world geoscience experiences and problems. In this presentation, we discuss details of three research-like projects that require students to access original data, process and model the data using appropriate geological software, interpret and defend results, and disseminate results in reports, posters, and class presentations. The projects are from three upper division courses, Carbonate Systems, Sequence Stratigraphy, and Geophysical Systems, where teams of two to four students are presented with defined problems of durations ranging from a few weeks to an entire semester. Project goals and location, some background information, and specified dates and expectations for interim and final written and oral reports are provided to students. Some projects require the entire class to work on one data set, some require each team to be initially responsible for a portion of the project with teams ultimately merging data for interpretation and to arrive at final conclusions. Some projects require students to utilize data from appropriate geological web sites such as state geological surveys. Others require students to design surveys and utilize appropriate instruments of their choice for field data collection. Students learn usage and applications of appropriate geological software in compiling, processing, modeling, and interpreting data and preparing formal reports and presentations. Students uniformly report heightened interest and motivation when engaged in these projects. Our new curriculum has resulted in an increase in students" quantitative and interpretive skills along with dramatic improvement in communication and

  3. Coordinate systems and map projections

    CERN Document Server

    Maling, DH

    1992-01-01

    A revised and expanded new edition of the definitive English work on map projections. The revisions take into account the huge advances in geometrical geodesy which have occurred since the early years of satellite geodesy. The detailed configuration of the geoid resulting from the GEOS and SEASAT altimetry measurements are now taken into consideration. Additionally, the chapter on computation of map projections is updated bearing in mind the availability of pocket calculators and microcomputers. Analytical derivation of some map projections including examples of pseudocylindrical and polyconic

  4. Comparison and selection of off-grid PV systems

    Science.gov (United States)

    Izmailov, Andrey Yu.; Lobachevsky, Yakov P.; Shepovalova, Olga V.

    2018-05-01

    This work deals with comparison, evaluation and selection of PV systems of the same type based on their technical parameters either indicated in their technical specifications or calculated ones. Stand-alone and grid backed up photoelectric systems have been considered. General requirements for photoelectric system selection and evaluation have been presented that ensure system operability and required efficiency in operation conditions. Generic principles and definition of photoelectric systems characteristics have been considered. The described method is mainly targeted at PV engineering personnel and private customers purchasing PV systems. It can be also applied in the course of project contests, tenders, etc.

  5. Nuclear power project management information system

    International Nuclear Information System (INIS)

    Zou Lailong; Zhang Peng; Xiao Ziyan; Chun Zengjun; Huang Futong

    2001-01-01

    Project Management Information System is an important infrastructure facility for the construction and operation of Nuclear Power Station. Based on the practice of Lingao nuclear power project management information system (NPMIS), the author describes the NPMIS design goals, system architecture and software functionality, points out the outline issues during the development and deployment of NPMIS

  6. Optimal fringe angle selection for digital fringe projection technique.

    Science.gov (United States)

    Wang, Yajun; Zhang, Song

    2013-10-10

    Existing digital fringe projection (DFP) systems mainly use either horizontal or vertical fringe patterns for three-dimensional shape measurement. This paper reveals that these two fringe directions are usually not optimal where the phase change is the largest to a given depth variation. We propose a novel and efficient method to determine the optimal fringe angle by projecting a set of horizontal and vertical fringe patterns onto a step-height object and by further analyzing two resultant phase maps. Experiments demonstrate the existence of the optimal angle and the success of the proposed optimal angle determination method.

  7. Activity modes selection for project crashing through deterministic simulation

    Directory of Open Access Journals (Sweden)

    Ashok Mohanty

    2011-12-01

    Full Text Available Purpose: The time-cost trade-off problem addressed by CPM-based analytical approaches, assume unlimited resources and the existence of a continuous time-cost function. However, given the discrete nature of most resources, the activities can often be crashed only stepwise. Activity crashing for discrete time-cost function is also known as the activity modes selection problem in the project management. This problem is known to be NP-hard. Sophisticated optimization techniques such as Dynamic Programming, Integer Programming, Genetic Algorithm, Ant Colony Optimization have been used for finding efficient solution to activity modes selection problem. The paper presents a simple method that can provide efficient solution to activity modes selection problem for project crashing.Design/methodology/approach: Simulation based method implemented on electronic spreadsheet to determine activity modes for project crashing. The method is illustrated with the help of an example.Findings: The paper shows that a simple approach based on simple heuristic and deterministic simulation can give good result comparable to sophisticated optimization techniques.Research limitations/implications: The simulation based crashing method presented in this paper is developed to return satisfactory solutions but not necessarily an optimal solution.Practical implications: The use of spreadsheets for solving the Management Science and Operations Research problems make the techniques more accessible to practitioners. Spreadsheets provide a natural interface for model building, are easy to use in terms of inputs, solutions and report generation, and allow users to perform what-if analysis.Originality/value: The paper presents the application of simulation implemented on a spreadsheet to determine efficient solution to discrete time cost tradeoff problem.

  8. RIVER PROTECTION PROJECT SYSTEM PLAN

    International Nuclear Information System (INIS)

    Certa, P.J.; Kirkbride, R.A.; Hohl, T.M.; Empey, P.A.; Wells, M.N.

    2009-01-01

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal

  9. RIVER PROTECTION PROJECT SYSTEM PLAN

    Energy Technology Data Exchange (ETDEWEB)

    CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

    2009-09-15

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and

  10. Selection of PDM information System

    Czech Academy of Sciences Publication Activity Database

    Maxa, J.; Neděla, Vilém

    147-149, - (2009), s. 912-917 ISSN 1012-0394 R&D Projects: GA AV ČR KJB200650602 Institutional research plan: CEZ:AV0Z20650511 Keywords : PDM * PLM * EPD * CAx Subject RIV: JA - Electronics ; Optoelectronics, Electrical Engineering

  11. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  12. A Selection Method for COTS Systems

    DEFF Research Database (Denmark)

    Hedman, Jonas

    new skills and methods supporting the process of evaluating and selecting information systems. This paper presents a method for selecting COTS systems. The method includes the following phases: problem framing, requirements and appraisal, and selection of systems. The idea and distinguishing feature...... behind the method is that improved understanding of organizational' ends' or goals should govern the selection of a COTS system. This can also be expressed as a match or fit between ‘ends' (e.g. improved organizational effectiveness) and ‘means' (e.g. implementing COTS systems). This way of approaching...

  13. Selecting personnel to work on the interactive graphics system

    International Nuclear Information System (INIS)

    Norton, F.J.

    1979-01-01

    The paper established criteria for the selection of personnel to work on the interactive graphics system and mentions some of human behavioral patterns that are created by the implementation of graphic systems. Some of the social and educational problems associated with the interactive graphics system will be discussed. The project also provided for collecting objective data which would be useful in assessing the benefits of interactive graphics systems

  14. Selecting personnel to work on the interactive graphics system

    Energy Technology Data Exchange (ETDEWEB)

    Norton, F.J.

    1979-11-30

    The paper established criteria for the selection of personnel to work on the interactive graphics system and mentions some of human behavioral patterns that are created by the implementation of graphic systems. Some of the social and educational problems associated with the interactive graphics system will be discussed. The project also provided for collecting objective data which would be useful in assessing the benefits of interactive graphics systems.

  15. The ENTRIA project. Selected disciplinary and interdisciplinary research topics

    International Nuclear Information System (INIS)

    Roehlig, Klaus-Juergen; Hocke, Peter; Walther, Clemens

    2015-01-01

    ENTRIA (''Disposal Options for Radioactive Residues: Interdisciplinary Analyses and Development of Evaluation Principles'', www.entria.de) is a joint research project carried out by twelve departments and institutes from German universities and major research institutions and one partner from Switzerland. It is financed by the German Ministry of Education and Research (BMBF). Scientists representing natural sciences, civil engineering, philosophy, law, social and political sciences, and technology assessment carry out disciplinary and interdisciplinary research addressing three options to manage especially high-level radioactive waste: - Final disposal in deep geological formations without any arrangements for retrieval, - disposal in deep geological formations with arrangements for monitoring and retrieval, and - (prolonged) surface (or near-surface) storage. In the paper, the following selected research topics - both disciplinary and interdisciplinary - are briefly introduced in order to provide an impression of the project scope: - Surface storage, - reference concepts for emplacement in deep geological formations with retrievability and monitoring, - radiation exposure and justification of measures, - interdisciplinary perspectives on dose limits, - comparative studies on nuclear waste governance, - nuclear waste governance in Switzerland, - public involvement and the German Site Selection Act, and - citizens' jury.

  16. Materials Selection for Aerospace Systems

    Science.gov (United States)

    Arnold, Steven M.; Cebon, David; Ashby, Mike

    2012-01-01

    A systematic design-oriented, five-step approach to material selection is described: 1) establishing design requirements, 2) material screening, 3) ranking, 4) researching specific candidates and 5) applying specific cultural constraints to the selection process. At the core of this approach is the definition performance indices (i.e., particular combinations of material properties that embody the performance of a given component) in conjunction with material property charts. These material selection charts, which plot one property against another, are introduced and shown to provide a powerful graphical environment wherein one can apply and analyze quantitative selection criteria, such as those captured in performance indices, and make trade-offs between conflicting objectives. Finding a material with a high value of these indices maximizes the performance of the component. Two specific examples pertaining to aerospace (engine blades and pressure vessels) are examined, both at room temperature and elevated temperature (where time-dependent effects are important) to demonstrate the methodology. The discussion then turns to engineered/hybrid materials and how these can be effectively tailored to fill in holes in the material property space, so as to enable innovation and increases in performance as compared to monolithic materials. Finally, a brief discussion is presented on managing the data needed for materials selection, including collection, analysis, deployment, and maintenance issues.

  17. User-Oriented Project Accounting System.

    Science.gov (United States)

    Hess, Larry G.; Alcorn, Lisa S.

    1990-01-01

    The project accounting system used by the University of Illinois Urbana-Champaign School of Chemical Sciences exchanges financial data with the campus' central accounting system and allows integration of this information with user-entered data to produce an easily read, fully obligated project accounting statement for the budget and period…

  18. Systems engineering real estate development projects

    Science.gov (United States)

    Gusakova, Elena; Titarenko, Boris; Stepanov, Vitaliy

    2017-10-01

    In recent years, real estate development has accumulated a wealth of experience in implementing major projects, which requires comprehension and systematization. The scientific instrument of system engineering is studied in the article and is substantively interpreted with reference to real estate development projects. The most perspective approaches and models are substantiated, allowing strategically to plan the life cycle of the project as a whole, and also to solve the engineering butt problems of the project. The relevance of further scientific studies of regularities and specifics of the life cycle of real estate development projects conducted at the Moscow State University of Economics and Management at the ISTA department is shown.

  19. Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This Project Execution Plan documents the methodology for managing Project W-211. Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for the future waste treatment plant, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AN-102, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the River Protection Project (RF'P) Waste Treatment Facility and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump-based retrieval system for any DST. This Project Execution Plan (PEP), derived from the predecessor Project Management Plan, documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering

  20. The embedded operating system project

    Science.gov (United States)

    Campbell, R. H.

    1984-01-01

    This progress report describes research towards the design and construction of embedded operating systems for real-time advanced aerospace applications. The applications concerned require reliable operating system support that must accommodate networks of computers. The report addresses the problems of constructing such operating systems, the communications media, reconfiguration, consistency and recovery in a distributed system, and the issues of realtime processing. A discussion is included on suitable theoretical foundations for the use of atomic actions to support fault tolerance and data consistency in real-time object-based systems. In particular, this report addresses: atomic actions, fault tolerance, operating system structure, program development, reliability and availability, and networking issues. This document reports the status of various experiments designed and conducted to investigate embedded operating system design issues.

  1. The embedded operating system project

    Science.gov (United States)

    Campbell, R. H.

    1985-01-01

    The design and construction of embedded operating systems for real-time advanced aerospace applications was investigated. The applications require reliable operating system support that must accommodate computer networks. Problems that arise in the construction of such operating systems, reconfiguration, consistency and recovery in a distributed system, and the issues of real-time processing are reported. A thesis that provides theoretical foundations for the use of atomic actions to support fault tolerance and data consistency in real-time object-based system is included. The following items are addressed: (1) atomic actions and fault-tolerance issues; (2) operating system structure; (3) program development; (4) a reliable compiler for path Pascal; and (5) mediators, a mechanism for scheduling distributed system processes.

  2. Proposal for Land Consolidation Project Solutions for Selected Problem Areas

    Science.gov (United States)

    Wojcik-Len, Justyna; Strek, Zanna

    2017-12-01

    One of the economic tools for supporting agricultural policy are the activities implemented under the Rural Development Program (RDP). By encouraging agricultural activities and creating equal opportunities for development of farms, among others in areas with unfavourable environmental conditions characterized by low productivity of soils exposed to degradation, decision makers can contribute to improving the spatial structure of rural areas. In Poland, one of the major concerns are agricultural problem areas (regions). In view of this situation, the aim of this article was to characterize the problem areas in question and propose land consolidation project solutions for selected fragments of those areas. This paper presents the results of a review of literature and an analysis of geodetic and cartographic data regarding the problem areas. The process of land consolidation, which is one of the technical and legal instruments supporting the development of rural areas, was characterized. The study allowed the present authors to establish criteria for selecting agricultural problem areas for land consolidation. To develop a proposal for rational management of the problem areas, key general criteria (location, topography, soil quality and usefulness) and specific criteria were defined and assigned weights. A conception of alternative development of the agricultural problem areas was created as part of a land consolidation project. The results were used to create a methodology for the development of agricultural problem areas to be employed during land consolidation in rural areas. Every agricultural space includes areas with unfavourable environmental and soil conditions determined by natural or anthropogenic factors. Development of agricultural problem areas through land consolidation should take into account the specific functions assigned to these areas in land use plans, as well as to comply with legal regulations.

  3. National inventory of selected biological monitoring programs. Summary report of current or recently completed projects, 1976

    Energy Technology Data Exchange (ETDEWEB)

    Kemp, H. T.

    1976-10-01

    The Inventory has resulted in establishment of a series of data bases containing biological monitoring information of varying types, namely, directory of investigators, record of projects received from mail questionnaire, detailed description of selected biomonitoring projects, and bibliographic citations supporting the projects received. This report contains detailed descriptions of selected biomonitoring projects organized on a state-by-state basis and with appropriate indices.

  4. Characteristics of Criteria for Selecting Investment Projects under Uncertainty

    Directory of Open Access Journals (Sweden)

    Adrian ENCIU

    2011-07-01

    Full Text Available Within financial theory and practice, there are used five main criteria for selecting investment projects: the net present value (NPV criterion, the internal rate of return (IRR criterion, the return term (RT criterion, the profitability ratio (PR criterion and the supplementary return (SR criterion. The assay will emphasize several new properties of said indexes for investment assessment, having as starting point the hypotheses of (approximately normal repartition of cash-flows generated by an investment project. The obtained results point to the fact that the NPV indexes (the analysis of this criterion was carried out in the article “The NPV Criterion for Valuing Investments under Uncertainty”, Daniel Armeanu, Leonard Lache, Economic Computation and Economic Cybernetics Studies and Research no. 4/2009, pp. 133-143, IRR, PR, RT and SR register normal repartitions, therefore simplifying the investment analysis under economic uncertainty, by the capacity of building confidence intervals and assessing probabilities for the inferior limits of said investment assessment indexes.

  5. TidGen Power System Commercialization Project

    Energy Technology Data Exchange (ETDEWEB)

    Sauer, Christopher R. [President & CEO; McEntee, Jarlath [VP Engineering & CTO

    2013-12-30

    ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen® Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPC’s tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen® Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen® Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric

  6. Designing and conducting health system research projects, volume ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    These 'green modules'* found their way to Malaysia, where Indra ..... They determine nutritional and hygiene practices, alert children to dangers, provide care in ... money from taxes and donor agencies to finance the health care system. .... The principle of cost-effectiveness is important in the selection of research projects.

  7. Portable Data Acquisition System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Armstrong researchers have developed a portable data acquisition system (PDAT) that can be easily transported and set up at remote locations to display and archive...

  8. Facilities projects performance measurement system

    International Nuclear Information System (INIS)

    Erben, J.F.

    1979-01-01

    The two DOE-owned facilities at Hanford, the Fuels and Materials Examination Facility (FMEF), and the Fusion Materials Irradiation Test Facility (FMIT), are described. The performance measurement systems used at these two facilities are next described

  9. Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem Erzaij

    2016-06-01

    Full Text Available Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public and private companies in Iraqi construction sector were employed to identify main criteria and sub criteria for supplier selection and their priorities.The main criteria identified were quality of product, commercial aspect, delivery, reputation and position, and system quality . An effective technique in multiple criteria decision making (MCDM as analytical hierarchy process (AHP have been used to get importance weights of criteria based on experts judgment. Thereafter, a management software system for Evaluation and Selection of Engineering Equipment Suppliers (ESEES has been developed based on the results obtained from AHP. This model was validated in a case study at municipality of Baghdad involved actual cases of selection pumps suppliers for infrastructure projects .According to experts, this model can improve the current process followed in the supplier selection and aid decision makers to adopt better choices in the domain of selection engineering equipment suppliers.

  10. Projects management in organization on the selected example

    OpenAIRE

    A. Kania; M. Spilka; S. Griner

    2013-01-01

    Purpose: In this paper stages of project management taking into consideration many useful tools and methods were presented. The quality management in the project, the risk estimation, costs of the project realization and many others were discussed. The analysis of project management of an element using in an automotive industry was carried out.Design/methodology/approach: In this article classification of the projects was presented. The stages of project management and relations among them we...

  11. Implementing polytope projects for smart systems

    CERN Document Server

    Iordache, Octavian

    2017-01-01

    This book presents a domain of extreme industrial and scientific interest: the study of smart systems and structures. It presents polytope projects as comprehensive physical and cognitive architectures that support the investigation, fabrication and implementation of smart systems and structures. These systems feature multifunctional components that can perform sensing, control, and actuation. In light of the fact that devices, tools, methodologies and organizations based on electronics and information technology for automation, specific to the third industrial revolution, are increasingly reaching their limits, it is essential that smart systems be implemented in industry. Polytope projects facilitate the utilization of smart systems and structures as key elements of the fourth industrial revolution. The book begins by presenting polytope projects as a reference architecture for cyber-physical systems and smart systems, before addressing industrial process synthesis in Chapter 2. Flow-sheet trees, cyclic sep...

  12. Projected large flood event sensitivity to projection selection and temporal downscaling methodology

    Energy Technology Data Exchange (ETDEWEB)

    Raff, D. [U.S. Dept. of the Interior, Bureau of Reclamation, Denver, Colorado (United States)

    2008-07-01

    Large flood events, that influence regulatory guidelines as well as safety of dams decisions, are likely to be affected by climate change. This talk will evaluate the use of climate projections downscaled and run through a rainfall - runoff model and its influence on large flood events. The climate spatial downscaling is performed statistically and a re-sampling and scaling methodology is used to temporally downscale from monthly to daily signals. The signals are run through a National Weather Service operational rainfall-runoff model to produce 6-hour flows. The flows will be evaluated for changes in large events at look-ahead horizons from 2011 - 2040, 2041 - 2070, and 2071 - 2099. The sensitivity of results will be evaluated with respect to projection selection criteria and re-sampling and scaling criteria for the Boise River in Idaho near Lucky Peak Dam. (author)

  13. Projected large flood event sensitivity to projection selection and temporal downscaling methodology

    International Nuclear Information System (INIS)

    Raff, D.

    2008-01-01

    Large flood events, that influence regulatory guidelines as well as safety of dams decisions, are likely to be affected by climate change. This talk will evaluate the use of climate projections downscaled and run through a rainfall - runoff model and its influence on large flood events. The climate spatial downscaling is performed statistically and a re-sampling and scaling methodology is used to temporally downscale from monthly to daily signals. The signals are run through a National Weather Service operational rainfall-runoff model to produce 6-hour flows. The flows will be evaluated for changes in large events at look-ahead horizons from 2011 - 2040, 2041 - 2070, and 2071 - 2099. The sensitivity of results will be evaluated with respect to projection selection criteria and re-sampling and scaling criteria for the Boise River in Idaho near Lucky Peak Dam. (author)

  14. Expert System Model for Educational Personnel Selection

    Directory of Open Access Journals (Sweden)

    Héctor A. Tabares-Ospina

    2013-06-01

    Full Text Available The staff selection is a difficult task due to the subjectivity that the evaluation means. This process can be complemented using a system to support decision. This paper presents the implementation of an expert system to systematize the selection process of professors. The management of software development is divided into 4 parts: requirements, design, implementation and commissioning. The proposed system models a specific knowledge through relationships between variables evidence and objective.

  15. Oilfield Flare Gas Electricity Systems (OFFGASES Project)

    Energy Technology Data Exchange (ETDEWEB)

    Rachel Henderson; Robert Fickes

    2007-12-31

    The Oilfield Flare Gas Electricity Systems (OFFGASES) project was developed in response to a cooperative agreement offering by the U.S. Department of Energy (DOE) and the National Energy Technology Laboratory (NETL) under Preferred Upstream Management Projects (PUMP III). Project partners included the Interstate Oil and Gas Compact Commission (IOGCC) as lead agency working with the California Energy Commission (CEC) and the California Oil Producers Electric Cooperative (COPE). The project was designed to demonstrate that the entire range of oilfield 'stranded gases' (gas production that can not be delivered to a commercial market because it is poor quality, or the quantity is too small to be economically sold, or there are no pipeline facilities to transport it to market) can be cost-effectively harnessed to make electricity. The utilization of existing, proven distribution generation (DG) technologies to generate electricity was field-tested successfully at four marginal well sites, selected to cover a variety of potential scenarios: high Btu, medium Btu, ultra-low Btu gas, as well as a 'harsh', or high contaminant, gas. Two of the four sites for the OFFGASES project were idle wells that were shut in because of a lack of viable solutions for the stranded noncommercial gas that they produced. Converting stranded gas to useable electrical energy eliminates a waste stream that has potential negative environmental impacts to the oil production operation. The electricity produced will offset that which normally would be purchased from an electric utility, potentially lowering operating costs and extending the economic life of the oil wells. Of the piloted sites, the most promising technologies to handle the range were microturbines that have very low emissions. One recently developed product, the Flex-Microturbine, has the potential to handle the entire range of oilfield gases. It is deployed at an oilfield near Santa Barbara to run on waste gas

  16. DIstributed VIRtual System (DIVIRS) Project

    Science.gov (United States)

    Schorr, Herbert; Neuman, B. Clifford; Gaines, Stockton R.; Mizell, David

    1996-01-01

    The development of Prospero moved from the University of Washington to ISI and several new versions of the software were released from ISI during the contract period. Changes in the first release from ISI included bug fixes and extensions to support the needs of specific users. Among these changes was a new option to directory queries that allows attributes to be returned for all files in a directory together with the directory listing. This change greatly improves the performance of their server and reduces the number of packets sent across their trans-pacific connection to the rest of the internet. Several new access method were added to the Prospero file method. The Prospero Data Access Protocol was designed, to support secure retrieval of data from systems running Prospero.

  17. ERP systems selection in multinational enterprises: a practical guide

    Directory of Open Access Journals (Sweden)

    Moutaz Haddara

    2018-01-01

    Full Text Available The Enterprise Resource Planning (ERP system selection is an early phase in the ERP adoption process. When organizations evaluate an ERP, they commonly develop their own selection criteria that usually involve various system and vendor related factors. While the selection process is critical, however, there is an apparent research gap in literature. The ERP selection effort also focuses on the system’s fit with the organizational requirements and needs. Thus, the selection phase is critical, because if an organization chooses an unfit ERP, the whole project could be predestined to fail. This research provides an overview of an ERP selection process at an overseas branch office of a multinational company. The process employed a simple multi-attribute rating technique (SMART for evaluation. In addition, this research presents how cross-border data protection laws between the parent company and its branch have influenced the selection process. As the ERP system has been implemented successfully, the method and the selection factors have been proven adequate for the selection process.

  18. Project Management of a personnel radiation records computer system

    International Nuclear Information System (INIS)

    Labenski, T.

    1984-01-01

    Project Management techniques have been used to develop a data base management information system to provide storage and retrieval of personnel radiation and Health Physics records. The system is currently being developed on a Hewlett Packard 1000 Series E Computer with provisions to include plant radiation survey information, radiation work permit information, inventory management for Health Physics supplies and instrumentation, and control of personnel access to radiological controlled areas. The methodologies used to manage the overall project are presented along with selection and management of software vendors

  19. Parallel Scaling Characteristics of Selected NERSC User ProjectCodes

    Energy Technology Data Exchange (ETDEWEB)

    Skinner, David; Verdier, Francesca; Anand, Harsh; Carter,Jonathan; Durst, Mark; Gerber, Richard

    2005-03-05

    This report documents parallel scaling characteristics of NERSC user project codes between Fiscal Year 2003 and the first half of Fiscal Year 2004 (Oct 2002-March 2004). The codes analyzed cover 60% of all the CPU hours delivered during that time frame on seaborg, a 6080 CPU IBM SP and the largest parallel computer at NERSC. The scale in terms of concurrency and problem size of the workload is analyzed. Drawing on batch queue logs, performance data and feedback from researchers we detail the motivations, benefits, and challenges of implementing highly parallel scientific codes on current NERSC High Performance Computing systems. An evaluation and outlook of the NERSC workload for Allocation Year 2005 is presented.

  20. Method for Business Process Management System Selection

    OpenAIRE

    Westelaken, van de, Thijs; Terwee, Bas; Ravesteijn, Pascal

    2013-01-01

    In recent years business process management (BPM) and specifically information systems that support the analysis, design and execution of processes (also called business process management systems (BPMS)) are getting more attention. This has lead to an increase in research on BPM and BPMS. However the research on BPMS is mostly focused on the architecture of the system and how to implement such systems. How to select a BPM system that fits the strategy and goals of a specific organization is ...

  1. Project Specific Quality Assurance Plan Project (QAPP) W-211 Initial Tank Retrieval Systems (ITRS)

    International Nuclear Information System (INIS)

    HALL, L.R.

    2000-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Project Hanford Quality Assurance Program is implemented by CH2M HILL Hanford Group Inc (CHG) for managing the Initial Tank Retrieval Systems (ITRS), Project W-211. This QAPP is responsive to the CHG Quality Assurance Program Description (QAPD) (LMH-MP-599) which provides direction for compliance to 10 CFR 830 120, ''Nuclear Safety Management, Quality Assurance Requirements'', and DOE Order 5700 6C, ''Quality Assurance'' Project W-211 modifies existing facilities and provides systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for future processing plants, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. This project includes the design, procurement, construction, startup and turnover of these retrieval systems This QAPP identifies organizational structures and responsibilities. Implementing procedures used by CHG project management can be found in the CHG Quality Assurance Program (CHG QAP) Implementation Matrix located in HNF-IP-0842, Volume XI, Attachment Proposed verification and inspection activities for critical items within the scope of project W-211 are identified in Attachment 1 W-211. Project participants will identify the implementing procedures used by their organization within their QAF'Ps. This project specific QAPP is used to identify requirements in addition to the QAPD and provide, by reference, additional information to other project documents

  2. Geothermal Reservoir Technology Research Program: Abstracts of selected research projects

    Energy Technology Data Exchange (ETDEWEB)

    Reed, M.J. (ed.)

    1993-03-01

    Research projects are described in the following areas: geothermal exploration, mapping reservoir properties and reservoir monitoring, and well testing, simulation, and predicting reservoir performance. The objectives, technical approach, and project status of each project are presented. The background, research results, and future plans for each project are discussed. The names, addresses, and telephone and telefax numbers are given for the DOE program manager and the principal investigators. (MHR)

  3. Project Design Concept - Primary Ventilation System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    Tank Farm Restoration and Safe Operation (TFRSO), Project W-3 14 was established to provide upgrades that would improve the reliability and extend the system life of portions of the waste transfer, electrical, ventilation, instrumentation and control systems for the Hanford Site Tank Farms. An assessment of the tank farm system was conducted and the results are documented in system assessment reports. Based on the deficiencies identified in the tank farm system assessment reports, and additional requirements analysis performed in support of the River Protection Project (RPP), an approved scope for the TFRSO effort was developed and documented in the Upgrade Scope Summary Report (USSR), WHC-SD-W314-RPT-003, Rev. 4. The USSR establishes the need for the upgrades and identifies the specific equipment to be addressed by this project. This Project Design Concept (PDC) is in support of the Phase 2 upgrades and provides an overall description of the operations concept for the W-314 Primary Ventilation Systems. Actual specifications, test requirements, and procedures are not included in this PDC. The PDC is a ''living'' document, which will be updated throughout the design development process to provide a progressively more detailed description of the W-314 Primary Ventilation Systems design. The Phase 2 upgrades to the Primary Ventilation Systems shall ensure that the applicable current requirements are met for: Regulatory Compliance; Safety; Mission Requirements; Reliability; and Operational Requirements

  4. MSFC Propulsion Systems Department Knowledge Management Project

    Science.gov (United States)

    Caraccioli, Paul A.

    2007-01-01

    This slide presentation reviews the Knowledge Management (KM) project of the Propulsion Systems Department at Marshall Space Flight Center. KM is needed to support knowledge capture, preservation and to support an information sharing culture. The presentation includes the strategic plan for the KM initiative, the system requirements, the technology description, the User Interface and custom features, and a search demonstration.

  5. UHP lamp systems for projection applications

    International Nuclear Information System (INIS)

    Derra, Guenther; Moench, Holger; Fischer, Ernst; Giese, Hermann; Hechtfischer, Ulrich; Heusler, Gero; Koerber, Achim; Niemann, Ulrich; Noertemann, Folke-Charlotte; Pekarski, Pavel; Pollmann-Retsch, Jens; Ritz, Arnd; Weichmann, Ulrich

    2005-01-01

    Projection systems have found widespread use in conference rooms and other professional applications during the last decade and are now entering the home TV market at a considerable pace. Projectors as small as about one litre are able to deliver several thousand screen lumens and are, with a system efficacy of over 10 lm W -1 , the most efficient display systems realized today. Short arc lamps are a key component for projection systems of the highest efficiency for small-size projection displays. The introduction of the ultra high performance (UHP) lamp system by Philips in 1995 can be identified as one of the key enablers of the commercial success of projection systems. The UHP lamp concept features outstanding arc luminance, a well suited spectrum, long life and excellent lumen maintenance. For the first time it combines a very high pressure mercury discharge lamp with extremely short and stable arc gap with a regenerative chemical cycle keeping the discharge walls free from blackening, leading to lifetimes of over 10 000 h. Since the introduction of the UHP lamp system, many important new technology improvements have been realized: burner designs for higher lamp power, advanced ignition systems, miniaturized electronic drivers and innovative reflector concepts. These achievements enabled the impressive increase of projector light output, a remarkable reduction in projector size and even higher optical efficiency in projection systems during the last years. In this paper the concept of the UHP lamp system is described, followed by a discussion of the technological evolution the UHP lamp has undergone so far. Last, but not least, the important improvements of the UHP lamp system including the electronic driver and the reflector are discussed. (review article)

  6. Generation IV and transmutation materials (GETMAT) project: First assessment of selected results

    International Nuclear Information System (INIS)

    Fazio, Concetta; Serrano, Marta; Gessi, Alessandro; Henry, Jean; Malerba, Lorenzo

    2015-01-01

    The Generation IV and Transmutation Material (GETMAT) project has been initiated within the 7. EURATOM framework programme with the objective to support the development of innovative reactor designs. Emphasis has been put on the investigation, both in the theoretical and experimental domains, of selected material properties that are cross-cutting among the various Generation IV and Transmutation systems. The selection of the properties to be investigated has been performed by identifying relevant conditions of key components as cores and primary systems. Moreover, taking into account the envisaged conditions of these components it turned out that innovative materials might be a better choice with respect to conventional nuclear grade steels. Therefore, ODS alloys and 9-12 Cr Ferritic/Martensitic (F/M) steels have been selected as reference for the GETMAT project. The R and D activities have been focused on basic characterisation of ODS alloys produced ad hoc for the project and on an extensive PIE programme of F/M steels irradiated in previous programmes. Finally, first principle modelling studies to explain irradiation hardening and embrittlement of F/M alloys were an additional important task. The objective of this manuscript is to make a first assessment of the results obtained within GETMAT. (authors)

  7. Computational Experiment Study on Selection Mechanism of Project Delivery Method Based on Complex Factors

    Directory of Open Access Journals (Sweden)

    Xiang Ding

    2014-01-01

    Full Text Available Project delivery planning is a key stage used by the project owner (or project investor for organizing design, construction, and other operations in a construction project. The main task in this stage is to select an appropriate project delivery method. In order to analyze different factors affecting the PDM selection, this paper establishes a multiagent model mainly to show how project complexity, governance strength, and market environment affect the project owner’s decision on PDM. Experiment results show that project owner usually choose Design-Build method when the project is very complex within a certain range. Besides, this paper points out that Design-Build method will be the prior choice when the potential contractors develop quickly. This paper provides the owners with methods and suggestions in terms of showing how the factors affect PDM selection, and it may improve the project performance.

  8. Estimation of volatility of selected oil production projects

    International Nuclear Information System (INIS)

    Costa Lima, Gabriel A.; Suslick, Saul B.

    2006-01-01

    In oil project valuation and investment decision-making, volatility is a key parameter, but it is difficult to estimate. From a traditional investment viewpoint, volatility reduces project value because it increases its discount rate via a higher risk premium. Contrarily, according to the real-option pricing theory, volatility may aggregate value to the project, since the downside potential is limited whereas the upside is theoretically unbounded. However, the estimation of project volatility is very complicated since there is not a historical series of project values. In such cases, many analysts assume that oil price volatility is equal to that of project. In order to overcome such problems, in this paper an alternative numerical method based on present value of future cash flows and Monte Carlo simulation is proposed to estimate the volatility of projects. This method is applied to estimate the volatility of 12 deep-water offshore oil projects considering that oil price will evolve according to one of two stochastic processes: Geometric Brownian Motion and Mean-Reverting Motion. Results indicate that the volatility of commodity usually undervalue that of project. For the set of offshore projects analyzed in this paper, project volatility is at least 79% higher than that of oil prices and increases dramatically in those cases of high capital expenditures and low price. (author)

  9. ISSUES REGARDING THE FINANCIAL FLOW PROJECTIONS IN THE SELECTION OF INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    Mariana Rodica ŢÎRLEA

    2015-06-01

    Full Text Available For a company, through investment activities, it is followed to either create new abilities or expand the existing abilities, the partial or complete replacement of existing technical base or its modernization. In the condition that it is desired the creation of a technical base, the investment involves the purchase of fixed capital that can materialize in: buildings, special buildings, land, vehicles, facilities, equipment, etc. In terms of expansion and modernization, investment implies the existence of a material base on which should be intervened wholly or partly by its development or modernization. For the selection of investment projects in the context of investment strategy established at enterprise level through a Financial justification and prioritization of investments this should lead to the achievement of the objectives set at its level.

  10. Multiuser hybrid switched-selection diversity systems

    KAUST Repository

    Shaqfeh, Mohammad

    2011-09-01

    A new multiuser scheduling scheme is proposed and analyzed in this paper. The proposed system combines features of conventional full-feedback selection-based diversity systems and reduced-feedback switch-based diversity systems. The new hybrid system provides flexibility in trading-off the channel information feedback overhead with the prospected multiuser diversity gains. The users are clustered into groups, and the users\\' groups are ordered into a sequence. Per-group feedback thresholds are used and optimized to maximize the system overall achievable rate. The proposed hybrid system applies switched diversity criterion to choose one of the groups, and a selection criterion to decide the user to be scheduled from the chosen group. Numerical results demonstrate that the system capacity increases as the number of users per group increases, but at the cost of more required feedback messages. © 2011 IEEE.

  11. World energy projection system: Model documentation

    Science.gov (United States)

    1992-06-01

    The World Energy Project System (WEPS) is an accounting framework that incorporates projects from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product) and about the rate of incremental energy requirements met by hydropower, geothermal, coal, and natural gas to produce projections of world energy consumption published annually by the Energy Information Administration (EIA) in the International Energy Outlook (IEO). Two independently documented models presented in Figure 1, the Oil Market Simulation (OMS) model and the World Integrated Nuclear Evaluation System (WINES), provide projections of oil and nuclear power consumption published in the IEO. Output from a third independently documented model, and the International Coal Trade Model (ICTM), is not published in the IEO but is used in WEPS as a supply check on projections of world coal consumption produced by WEPS and published in the IEO. A WEPS model of natural gas production documented in this report provides the same type of implicit supply check on the WEPS projections of world natural gas consumption published in the IEO. Two additional models are included in Figure 1, the OPEC Capacity model and the Non-OPEC Oil Production model. These WEPS models provide inputs to the OMS model and are documented in this report.

  12. World energy projection system: Model documentation

    International Nuclear Information System (INIS)

    1992-06-01

    The World Energy Project System (WEPS) is an accounting framework that incorporates projects from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product) and about the rate of incremental energy requirements met by hydropower, geothermal, coal, and natural gas to produce projections of world energy consumption published annually by the Energy Information Administration (EIA) in the International Energy Outlook (IEO) (Figure 1). Two independently documented models presented in Figure 1, the Oil Market Simulation (OMS) model and the World Integrated Nuclear Evaluation System (WINES) provide projections of oil and nuclear power consumption published in the IEO. Output from a third independently documented model, and the International Coal Trade Model (ICTM), is not published in the IEO but is used in WEPS as a supply check on projections of world coal consumption produced by WEPS and published in the IEO. A WEPS model of natural gas production documented in this report provides the same type of implicit supply check on the WEPS projections of world natural gas consumption published in the IEO. Two additional models are included in Figure 1, the OPEC Capacity model and the Non-OPEC Oil Production model. These WEPS models provide inputs to the OMS model and are documented in this report

  13. HTR-E project. High-temperature components and systems

    International Nuclear Information System (INIS)

    Breuil, E.; Exner, R.

    2002-01-01

    The HTR-E European project (four years project) is proposed for the 5th Framework Programme and concerns the technical developments needed for the innovative components of a modern HTR with a direct cycle. These components have been selected with reference to the present projects (GT-MHR, PBMR): (1) the helium turbine, the recuperator heat exchanger, the electro-magnetic bearings and the helium rotating seal; (2) the tribology. Sliding innovative components in helium environment are particularly concerned. (3) the helium purification system. Recommendations on impurities contents have to be provided in accordance with the materials proposed for the innovative components. The main outcomes expected from the HTR-E project are the design recommendations and identification of further R and D needs for these components. This will be based: (1) on experience feedback from European past helium test loops and reactors; (2) on design studies, thermal-hydraulic and structural analyses; (3) and on experimental tests

  14. Control Configuration Selection for Multivariable Descriptor Systems

    DEFF Research Database (Denmark)

    Shaker, Hamid Reza; Stoustrup, Jakob

    2012-01-01

    Control configuration selection is the procedure of choosing the appropriate input and output pairs for the design of SISO (or block) controllers. This step is an important prerequisite for a successful industrial control strategy. In industrial practices it is often the case that the system, whi...... is that it can be used to propose a richer sparse or block diagonal controller structure. The interaction measure is used for control configuration selection of the linearized CSTR model with descriptor from....

  15. Medium - Scale Projects Selection Using Multi-Objective Decision ...

    African Journals Online (AJOL)

    Sixty (60) questionnaires were administered to experienced technically oriented personnel in the study area for evaluating objective weights attached to various projects. Forty-five responded and their values of objective weights attached to project cost, environmental effects, reliability, implementability and sustainable ...

  16. Evaluation and selection of decision-making methods to assess landfill mining projects.

    Science.gov (United States)

    Hermann, Robert; Baumgartner, Rupert J; Vorbach, Stefan; Ragossnig, Arne; Pomberger, Roland

    2015-09-01

    For the first time in Austria, fundamental technological and economic studies on recovering secondary raw materials from large landfills have been carried out, based on the 'LAMIS - Landfill Mining Austria' pilot project. A main focus of the research - and the subject of this article - was to develop an assessment or decision-making procedure that allows landfill owners to thoroughly examine the feasibility of a landfill mining project in advance. Currently there are no standard procedures that would sufficiently cover all the multiple-criteria requirements. The basic structure of the multiple attribute decision making process was used to narrow down on selection, conceptual design and assessment of suitable procedures. Along with a breakdown into preliminary and main assessment, the entire foundation required was created, such as definitions of requirements to an assessment method, selection and accurate description of the various assessment criteria and classification of the target system for the present 'landfill mining' vs. 'retaining the landfill in after-care' decision-making problem. Based on these studies, cost-utility analysis and the analytical-hierarchy process were selected from the range of multiple attribute decision-making procedures and examined in detail. Overall, both methods have their pros and cons with regard to their use for assessing landfill mining projects. Merging these methods or connecting them with single-criteria decision-making methods (like the net present value method) may turn out to be reasonable and constitute an appropriate assessment method. © The Author(s) 2015.

  17. Designing and Conducting Health Systems Research Projects ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Home · Resources · Publications. Designing and Conducting Health Systems Research Projects Volume 1: Proposal Development and Fieldwork ... IDRC and the United Kingdom's Global AMR Innovation Fund—managed by the ... New website will help record vital life events to improve access to services for all.

  18. 76 FR 12354 - Cumberland System of Projects

    Science.gov (United States)

    2011-03-07

    ... Third Scenario--Return to Original Marketing Policy Inside TVA Preference Customers Capacity and Base.... Discussion: The marketing policy for the Cumberland System of Projects provides peaking capacity, along with 1500 hours of energy annually with each kilowatt of capacity, to customers outside the Tennessee Valley...

  19. Digital detection systems for projection radiography

    International Nuclear Information System (INIS)

    Schulz, R.F.

    2001-01-01

    This article gives a survey of digital X-ray detection systems for projection radiography. The different principles are compared and some general characteristics are derived. The basic conversion mechanisms in the absorption layers are described. The basic principles of solid state X-ray detectors and their general characteristics are elucidated as well as some similarities with detectors for computed tomography. Some important application and system aspects are considered. An outlook on further possible developments in this field is given. (orig.) [de

  20. Project risk management in complex petrochemical system

    Directory of Open Access Journals (Sweden)

    Kirin Snežana

    2012-01-01

    Full Text Available Investigation of risk in complex industrial systems, as well as evaluation of main factors influencing decision making and implementation process using large petrochemical company as an example, has proved the importance of successful project risk management. This is even more emphasized when analyzing systems with complex structure, i.e. with several organizational units. It has been shown that successful risk management requires modern methods, based on adequate application of statistical analysis methods.

  1. Tank waste remediation system characterization project quality policies. Revision 1

    International Nuclear Information System (INIS)

    Trimble, D.J.

    1995-01-01

    These Quality Policies (QPs) describe the Quality Management System of the Tank Waste Characterization Project (hereafter referred to as the Characterization Project), Tank Waste Remediation System (TWRS), Westinghouse Hanford Company (WHC). The Quality Policies and quality requirements described herein are binding on all Characterization Project organizations. To achieve quality, the Characterization Project management team shall implement this Characterization Project Quality Management System

  2. World Energy Projection System model documentation

    International Nuclear Information System (INIS)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA

  3. World Energy Projection System model documentation

    Energy Technology Data Exchange (ETDEWEB)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA.

  4. The NASA Advanced Space Power Systems Project

    Science.gov (United States)

    Mercer, Carolyn R.; Hoberecht, Mark A.; Bennett, William R.; Lvovich, Vadim F.; Bugga, Ratnakumar

    2015-01-01

    The goal of the NASA Advanced Space Power Systems Project is to develop advanced, game changing technologies that will provide future NASA space exploration missions with safe, reliable, light weight and compact power generation and energy storage systems. The development effort is focused on maturing the technologies from a technology readiness level of approximately 23 to approximately 56 as defined in the NASA Procedural Requirement 7123.1B. Currently, the project is working on two critical technology areas: High specific energy batteries, and regenerative fuel cell systems with passive fluid management. Examples of target applications for these technologies are: extending the duration of extravehicular activities (EVA) with high specific energy and energy density batteries; providing reliable, long-life power for rovers with passive fuel cell and regenerative fuel cell systems that enable reduced system complexity. Recent results from the high energy battery and regenerative fuel cell technology development efforts will be presented. The technical approach, the key performance parameters and the technical results achieved to date in each of these new elements will be included. The Advanced Space Power Systems Project is part of the Game Changing Development Program under NASAs Space Technology Mission Directorate.

  5. [A Method for Selecting Self-Adoptive Chromaticity of the Projected Markers].

    Science.gov (United States)

    Zhao, Shou-bo; Zhang, Fu-min; Qu, Xing-hua; Zheng, Shi-wei; Chen, Zhe

    2015-04-01

    The authors designed a self-adaptive projection system which is composed of color camera, projector and PC. In detail, digital micro-mirror device (DMD) as a spatial light modulator for the projector was introduced in the optical path to modulate the illuminant spectrum based on red, green and blue light emitting diodes (LED). However, the color visibility of active markers is affected by the screen which has unknown reflective spectrum as well. Here active markers are projected spot array. And chromaticity feature of markers is sometimes submerged in similar spectral screen. In order to enhance the color visibility of active markers relative to screen, a method for selecting self-adaptive chromaticity of the projected markers in 3D scanning metrology is described. Color camera with 3 channels limits the accuracy of device characterization. For achieving interconversion of device-independent color space and device-dependent color space, high-dimensional linear model of reflective spectrum was built. Prior training samples provide additional constraints to yield high-dimensional linear model with more than three degrees of freedom. Meanwhile, spectral power distribution of ambient light was estimated. Subsequently, markers' chromaticity in CIE color spaces was selected via maximization principle of Euclidean distance. The setting values of RGB were easily estimated via inverse transform. Finally, we implemented a typical experiment to show the performance of the proposed approach. An 24 Munsell Color Checker was used as projective screen. Color difference in the chromaticity coordinates between the active marker and the color patch was utilized to evaluate the color visibility of active markers relative to the screen. The result comparison between self-adaptive projection system and traditional diode-laser light projector was listed and discussed to highlight advantage of our proposed method.

  6. METHOD FOR SELECTION OF PROJECT MANAGEMENT APPROACH BASED ON FUZZY CONCEPTS

    Directory of Open Access Journals (Sweden)

    Igor V. KONONENKO

    2017-03-01

    Full Text Available Literature analysis of works that devoted to research of the selection a project management approach and development of effective methods for this problem solution is given. Mathematical model and method for selection of project management approach with fuzzy concepts of applicability of existing approaches are proposed. The selection is made of such approaches as the PMBOK Guide, the ISO21500 standard, the PRINCE2 methodology, the SWEBOK Guide, agile methodologies Scrum, XP, and Kanban. The number of project parameters which have a great impact on the result of the selection and measure of their impact is determined. Project parameters relate to information about the project, team, communication, critical project risks. They include the number of people involved in the project, the customer's experience with this project team, the project team's experience in this field, the project team's understanding of requirements, adapting ability, initiative, and others. The suggested method is considered on the example of its application for selection a project management approach to software development project.

  7. Project Management Plan for Initial Tank Retrieval Systems, Project W-211

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    1999-01-01

    Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for future processing plants, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AP-108, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the Privatized waste processing plant and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump based retrieval system for any DST. This Project Management Plan (PMP) documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering

  8. Generalized projective synchronization between Lorenz system and Chen's system

    International Nuclear Information System (INIS)

    Li Guohui

    2007-01-01

    On the basis of active backstepping design, this paper presents the generalized projective synchronization between two different chaotic systems: Lorenz system and Chen's system. The proposed method combines backstepping methods and active control without having to calculate the Lyapunov exponents and the eigenvalues of the Jacobian matrix, which makes it simple and convenient. Numerical simulations show that this method works very well

  9. Nuclear Power Plant project site selection geotechnical considerations

    International Nuclear Information System (INIS)

    Katti, V.J.; Banerjee, D.C.

    1997-01-01

    During the selection of a site for Nuclear Power Plant (NPP) and Radioactive Waste Plant (RWP), geotechnical investigations play a significant role in deciding merits and demerits of the sites. Any accidents in these units can play havoc on mankind and may leave bitter imprints on generations to come. Hence proper care has to be taken at the early stage for selecting the sites. Site selection procedure is a complicated one, because it involves experts from various disciplines like geology, geophysics, civil, mechanical electrical engineering, health-physics and other fields

  10. A Framework for Six Sigma Project Selection in Higher Educational Institutions, Using a Weighted Scorecard Approach

    Science.gov (United States)

    Holmes, Monica C.; Jenicke, Lawrence O.; Hempel, Jessica L.

    2015-01-01

    Purpose: This paper discusses the importance of the Six Sigma selection process, describes a Six Sigma project in a higher educational institution and presents a weighted scorecard approach for project selection. Design/Methodology/Approach: A case study of the Six Sigma approach being used to improve student support at a university computer help…

  11. System engineering at the MEGARA project

    Science.gov (United States)

    Pérez-Calpena, A.; García-Vargas, María. Luisa; Gil de Paz, A.; Gallego Maestro, J.; Carrasco Licea, E.; Sánchez Moreno, F.; Iglesias-Páramo, J.

    2014-08-01

    MEGARA (Multi-Espectrógrafo en GTC de Alta Resolución para Astronomía) is a facility instrument of the 10.4m GTC (La Palma, Spain) working at optical wavelengths that provides both Integral-Field Unit (IFU) and Multi- Object Spectrograph (MOS) capabilities at resolutions in the range R=6,000-20,000. The MEGARA focal plane subsystems are located at one of the GTC focal stations, while the MEGARA refractive VPH based spectrograph is located at one of the Nasmyth platforms. The fiber bundles conduct the light from the focal plane subsystems to the pseudo-slits at the entrance of the spectrograph. The project is an initiative led by Universidad Complutense de Madrid (Spain) in collaboration with INAOE (Mexico), IAA-CSIC (Spain) and Universidad Politécnica de Madrid (Spain) and is developed under contract with GRANTECAN. The project is carried out by a multidisciplinary and geographically distributed team, which includes the in-kind contributions of the project partners and personnel from several private companies. The MEGARA system-engineering plan has been tailored to the project and is being applied to ensure the technical control of the project in order to finally meet the science high-level requirements and GTC constrains.

  12. A Methodology for Collective Evaluation and Selection of Industrial R&D Projects

    OpenAIRE

    Muhittin Oral; Ossama Kettani; Pascal Lang

    1991-01-01

    This paper proposes a methodology for evaluating and selecting R&D projects in a collective decision setting, especially useful at sectorial and national levels. It consists of two major phases: Evaluation and Selection. The evaluation process repeatedly uses mathematical programming models to determine the "relative values" of a given R&D project from the viewpoint of the other R&D projects. The selection process of R&D projects is based on these "relative values" and is done through a model...

  13. Selection of priority investment projects for the development of the Russian Arctic

    Science.gov (United States)

    Novoselov, A.; Potravny, I.; Novoselova, I.; Gassiy, V.

    2017-12-01

    In the Russian Arctic, there is currently an active process of preparation and implementation of investment projects aiming to extract natural resources, with the aim of sustainable socioeconomic development of the region. These projects are associated with the development of key zones in the Arctic and involve the exploration for and production of minerals (diamonds, gold, rare-earth metals, oil, and gas) and the development of energy and infrastructure (e.g., the Northern Sea Route). Such projects, which are often carried out in territories of traditional nature management belonging to the indigenous peoples of the North, must consider their environmental and social responsibility and the preservation of the ethnic identity and culture of indigenous peoples. The extraction of mineral deposits in the Arctic and the Far North places new demands on subsoil users, related to the preservation and development of the socio-cultural environment of the indigenous peoples of the North and to the ecological rehabilitation of the area. This article presents economic and mathematical models for selecting the optimal development project options based on the pairwise comparison of investment projects and the evaluation of indigenous peoples' preferences. We investigated the investment projects' impact on traditional territories in the Arctic, including the Republic of Sakha (Yakutia), in terms of socioeconomic and ethnological development, and environmental change. The suggested system of models can be used to assess the priority of projects supporting and developing the region in the mining corporation's area of responsibility. The proposed models are based on fuzzy set theory, which provides an effective assessment of the population's preferences for projects. Data are processed using the hierarchy analysis method and multivariate optimization calculations to determine the project sets at different funding levels. The creation of information-linked processing models is

  14. A Multiagent Evolutionary Algorithm for the Resource-Constrained Project Portfolio Selection and Scheduling Problem

    Directory of Open Access Journals (Sweden)

    Yongyi Shou

    2014-01-01

    Full Text Available A multiagent evolutionary algorithm is proposed to solve the resource-constrained project portfolio selection and scheduling problem. The proposed algorithm has a dual level structure. In the upper level a set of agents make decisions to select appropriate project portfolios. Each agent selects its project portfolio independently. The neighborhood competition operator and self-learning operator are designed to improve the agent’s energy, that is, the portfolio profit. In the lower level the selected projects are scheduled simultaneously and completion times are computed to estimate the expected portfolio profit. A priority rule-based heuristic is used by each agent to solve the multiproject scheduling problem. A set of instances were generated systematically from the widely used Patterson set. Computational experiments confirmed that the proposed evolutionary algorithm is effective for the resource-constrained project portfolio selection and scheduling problem.

  15. SELECTION OF EFFECTIVE MODELS OF PROJECT IMPLEMENTATION IN A CHANGING FINANCIAL SITUATION

    Directory of Open Access Journals (Sweden)

    Александр Иванович МЕНЕЙЛЮК

    2015-06-01

    Full Text Available The article describes the methods of selecting effective models of construction projects of residential buildings and recommendations for its use. The technique is based on the construction of the models in the program Microsoft Project and analysis using the program COMPEX. Methods can be used not only for building projects. It is especially effective in a variable financial situation.

  16. Selecting RMF Controls for National Security Systems

    Energy Technology Data Exchange (ETDEWEB)

    Witzke, Edward L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-08-01

    In 2014, the United States Department of Defense started tra nsitioning the way it performs risk management and accreditation of informatio n systems to a process entitled Risk Management Framework for DoD Information Technology or RMF for DoD IT. There are many more security and privacy contro ls (and control enhancements) from which to select in RMF, than there w ere in the previous Information Assurance process. This report is an attempt t o clarify the way security controls and enhancements are selected. After a brief overview and comparison of RMF for DoD I T with the previously used process, this report looks at the determination of systems as National Security Systems (NSS). Once deemed to be an NSS, this report addr esses the categorization of the information system with respect to impact level s of the various security objectives and the selection of an initial baseline o f controls. Next, the report describes tailoring the controls through the use of overl ays and scoping considerations. Finally, the report discusses organizatio n-defined values for tuning the security controls to the needs of the information system.

  17. Selection and Specification of Rear-Projection Screens.

    Science.gov (United States)

    Vlahos, Petro

    1961-01-01

    The characteristics of the rear-projection screen are examined in detail. Numerical constants are provided that define these characteristics for practical screens and convert foot-candles to footlamberts. A procedure is given by which an optimum screen may be specified for a specific application. Contents include--(1) introduction, (2) projection…

  18. 7 CFR 3570.67 - Project selection priorities.

    Science.gov (United States)

    2010-01-01

    ... points; or (4) Between 20,001 and 50,000, inclusive, when applicable—5 points. (b) Income priorities. The median household income of the population to be served by the proposed project is below the higher of the poverty line or: (1) 60 percent of the State nonmetropolitan median household income—30 points; (2) 70...

  19. Selective evolutionary generation systems: Theory and applications

    Science.gov (United States)

    Menezes, Amor A.

    This dissertation is devoted to the problem of behavior design, which is a generalization of the standard global optimization problem: instead of generating the optimizer, the generalization produces, on the space of candidate optimizers, a probability density function referred to as the behavior. The generalization depends on a parameter, the level of selectivity, such that as this parameter tends to infinity, the behavior becomes a delta function at the location of the global optimizer. The motivation for this generalization is that traditional off-line global optimization is non-resilient and non-opportunistic. That is, traditional global optimization is unresponsive to perturbations of the objective function. On-line optimization methods that are more resilient and opportunistic than their off-line counterparts typically consist of the computationally expensive sequential repetition of off-line techniques. A novel approach to inexpensive resilience and opportunism is to utilize the theory of Selective Evolutionary Generation Systems (SECS), which sequentially and probabilistically selects a candidate optimizer based on the ratio of the fitness values of two candidates and the level of selectivity. Using time-homogeneous, irreducible, ergodic Markov chains to model a sequence of local, and hence inexpensive, dynamic transitions, this dissertation proves that such transitions result in behavior that is called rational; such behavior is desirable because it can lead to both efficient search for an optimizer as well as resilient and opportunistic behavior. The dissertation also identifies system-theoretic properties of the proposed scheme, including equilibria, their stability and their optimality. Moreover, this dissertation demonstrates that the canonical genetic algorithm with fitness proportional selection and the (1+1) evolutionary strategy are particular cases of the scheme. Applications in three areas illustrate the versatility of the SECS theory: flight

  20. The UK Earth System Model project

    Science.gov (United States)

    Tang, Yongming

    2016-04-01

    In this talk we will describe the development and current status of the UK Earth System Model (UKESM). This project is a NERC/Met Office collaboration and has two objectives; to develop and apply a world-leading Earth System Model, and to grow a community of UK Earth System Model scientists. We are building numerical models that include all the key components of the global climate system, and contain the important process interactions between global biogeochemistry, atmospheric chemistry and the physical climate system. UKESM will be used to make key CMIP6 simulations as well as long-time (e.g. millennium) simulations, large ensemble experiments and investigating a range of future carbon emission scenarios.

  1. An Approach for Implementation of Project Management Information Systems

    Science.gov (United States)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  2. Optimal Sensor Selection for Health Monitoring Systems

    Science.gov (United States)

    Santi, L. Michael; Sowers, T. Shane; Aguilar, Robert B.

    2005-01-01

    Sensor data are the basis for performance and health assessment of most complex systems. Careful selection and implementation of sensors is critical to enable high fidelity system health assessment. A model-based procedure that systematically selects an optimal sensor suite for overall health assessment of a designated host system is described. This procedure, termed the Systematic Sensor Selection Strategy (S4), was developed at NASA John H. Glenn Research Center in order to enhance design phase planning and preparations for in-space propulsion health management systems (HMS). Information and capabilities required to utilize the S4 approach in support of design phase development of robust health diagnostics are outlined. A merit metric that quantifies diagnostic performance and overall risk reduction potential of individual sensor suites is introduced. The conceptual foundation for this merit metric is presented and the algorithmic organization of the S4 optimization process is described. Representative results from S4 analyses of a boost stage rocket engine previously under development as part of NASA's Next Generation Launch Technology (NGLT) program are presented.

  3. A bar coding system for environmental projects

    International Nuclear Information System (INIS)

    Barber, R.B.; Hunt, B.J.; Burgess, G.M.

    1988-01-01

    This paper presents BeCode systems, a bar coding system which provides both nuclear and commercial clients with a data capture and custody management program that is accurate, timely, and beneficial to all levels of project operations. Using bar code identifiers is an essentially paperless and error-free method which provides more efficient delivery of data through its menu card-driven structure, which speeds collection of essential data for uploading to a compatible device. The effects of this sequence include real-time information for operator analysis, management review, audits, planning, scheduling, and cost control

  4. Advanced EVA Suit Camera System Development Project

    Science.gov (United States)

    Mock, Kyla

    2016-01-01

    also spent creating a case for the original interface board that is already being used. This design is being done by use of Creo 2. Due to time constraints, I may not be able to complete the 3-D printing portion of this design, but I was able to use my knowledge of the interface board and Altium Design to help in the task. As a side project, I assisted another intern in selecting and programming a microprocessor to control linear actuators. These linear actuators will be used to move various increments of polyethylene for controlled radiation testing. For this, we began the software portion of the project using the Arduino's coding environment to control an Arduino Due and H-Bridge components. Along with the obvious learning of computer programs such as Altium Design and Creo 2, I also acquired more skills with networking and collaborating with others, being able to multi-task because of responsibilities to work on various projects, and how to set realistic goals in the work place. Like many internship projects, this project will be continued and improved, so I also had the chance to improve my organization and communication skills as I documented all of my meetings and research. As a result of my internship at JSC, I desire to continue a career with NASA, whether that be through another internship or possibly a co-op. I am excited to return to my university and continue my education in electrical engineering because of all of my experiences at JSC.

  5. Pilot Project to Optimize Superfund-financed Pump and Treat Systems: Summary Report and Lessons Learned

    Science.gov (United States)

    This report summarizes Phase II (site optimization) of the Nationwide Fund-lead Pump and Treat Optimization Project. This phase included conducting Remediation System Evaluations (RSEs) at each of the 20 sites selected in Phase I.

  6. AN EXCEL-BASED DECISION SUPPORT SYSTEM FOR SCORING AND RANKING PROPOSED R&D PROJECTS

    OpenAIRE

    ANNE DE PIANTE HENRIKSEN; SUSAN W. PALOCSAY

    2008-01-01

    One of the most challenging aspects of technology management is the selection of research and development (R&D) projects from among a group of proposals. This paper introduces an interactive, user-friendly decision support system for evaluating and ranking R&D projects and demonstrates its application on an example R&D program. It employs the scoring methodology developed by Henriksen and Traynor to provide a practical technique that considers both project merit and project cost in the evalua...

  7. Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects

    Energy Technology Data Exchange (ETDEWEB)

    Sanders, Mark D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mathew, Paul [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-05-01

    This guide presents a process for three key activities for the building owner in preparing to retrofit existing commercial buildings: selecting project teams, benchmarking the existing building, and financing the retrofit work. Although there are other essential steps in the retrofit process, the three activities presented in this guide are the critical elements where the building owner has the greatest influence on the outcome of the project.

  8. Selecting the right collaborative components in a construction project

    DEFF Research Database (Denmark)

    Bohnstedt, Kristian Ditlev; Wandahl, Søren

    2018-01-01

    Regardless of context and scope, collaboration is consistently attributed to be an essential determinant of success in construction projects. Researches have long been concerned with the issue of poor collaboration, but situational determination of collaborative components has been overlooked....... The questionnaire was distributed electronically to 440 respondents; after sorting a total of 288 valid responses were obtained. The result is a set of components in a model of structures of collaboration that facilitates a more efficient and effective situational collaboration (EESC), it is denoted as target areas...... structured in type of contract, party and component....

  9. Project Management Accountability System (PMAS) - Project Information and Data

    Data.gov (United States)

    Department of Veterans Affairs — The PMAS Dashboard provides a wide range of helpful data and information to assist you in project management and assessment. The drop down menu can be used to search...

  10. Tank Waste Remediation System Projects Document Control Plan

    International Nuclear Information System (INIS)

    Slater, G.D.; Halverson, T.G.

    1994-01-01

    The purpose of this Tank Waste Remediation System Projects Document Control Plan is to provide requirements and responsibilities for document control for the Hanford Waste Vitrification Plant (HWVP) Project and the Initial Pretreatment Module (IPM) Project

  11. SYSTEM DYNAMICS OF MANAGEMENT OF "UNFORESEEN CIRCUMSTANCES" OF THE PROJECT

    Directory of Open Access Journals (Sweden)

    Богдан Владимирович ГАЙДАБРУС

    2015-05-01

    Full Text Available Approaches for project contingency management through risk management and influence of stakeholders. Proposed system dynamic contingency project management model. The model describes the effects of various factors on the phase of project management through contingency.

  12. SYSTEM DYNAMICS OF MANAGEMENT OF "UNFORESEEN CIRCUMSTANCES" OF THE PROJECT

    OpenAIRE

    Богдан Владимирович ГАЙДАБРУС; Евгений Анатольевич ДРУЖИНИН

    2015-01-01

    Approaches for project contingency management through risk management and influence of stakeholders. Proposed system dynamic contingency project management model. The model describes the effects of various factors on the phase of project management through contingency.

  13. Project Delivery System Mode Decision Based on Uncertain AHP and Fuzzy Sets

    Science.gov (United States)

    Kaishan, Liu; Huimin, Li

    2017-12-01

    The project delivery system mode determines the contract pricing type, project management mode and the risk allocation among all participants. Different project delivery system modes have different characteristics and applicable scope. For the owners, the selection of the delivery mode is the key point to decide whether the project can achieve the expected benefits, it relates to the success or failure of project construction. Under the precondition of comprehensively considering the influence factors of the delivery mode, the model of project delivery system mode decision was set up on the basis of uncertain AHP and fuzzy sets, which can well consider the uncertainty and fuzziness when conducting the index evaluation and weight confirmation, so as to rapidly and effectively identify the most suitable delivery mode according to project characteristics. The effectiveness of the model has been verified via the actual case analysis in order to provide reference for the construction project delivery system mode.

  14. Selecting Health Care Improvement Projects: A Methodology Integrating Cause-and-Effect Diagram and Analytical Hierarchy Process.

    Science.gov (United States)

    Testik, Özlem Müge; Shaygan, Amir; Dasdemir, Erdi; Soydan, Guray

    It is often vital to identify, prioritize, and select quality improvement projects in a hospital. Yet, a methodology, which utilizes experts' opinions with different points of view, is needed for better decision making. The proposed methodology utilizes the cause-and-effect diagram to identify improvement projects and construct a project hierarchy for a problem. The right improvement projects are then prioritized and selected using a weighting scheme of analytical hierarchy process by aggregating experts' opinions. An approach for collecting data from experts and a graphical display for summarizing the obtained information are also provided. The methodology is implemented for improving a hospital appointment system. The top-ranked 2 major project categories for improvements were identified to be system- and accessibility-related causes (45%) and capacity-related causes (28%), respectively. For each of the major project category, subprojects were then ranked for selecting the improvement needs. The methodology is useful in cases where an aggregate decision based on experts' opinions is expected. Some suggestions for practical implementations are provided.

  15. So many developers, so many projects: toward a motivation-based theory of project selection

    NARCIS (Netherlands)

    van Osch, W.; Adelaar, T.; Pith, M.

    2011-01-01

    Studies into open source software (OSS) development projects have hitherto focused on the question of why people aremotivated to contribute to these projects, thereby assuming that motivational factors are the same across all types of OSSprojects. In this study we challenge this assumption by

  16. Channel Selection and Feature Projection for Cognitive Load Estimation Using Ambulatory EEG

    Directory of Open Access Journals (Sweden)

    Tian Lan

    2007-01-01

    Full Text Available We present an ambulatory cognitive state classification system to assess the subject's mental load based on EEG measurements. The ambulatory cognitive state estimator is utilized in the context of a real-time augmented cognition (AugCog system that aims to enhance the cognitive performance of a human user through computer-mediated assistance based on assessments of cognitive states using physiological signals including, but not limited to, EEG. This paper focuses particularly on the offline channel selection and feature projection phases of the design and aims to present mutual-information-based techniques that use a simple sample estimator for this quantity. Analyses conducted on data collected from 3 subjects performing 2 tasks (n-back/Larson at 2 difficulty levels (low/high demonstrate that the proposed mutual-information-based dimensionality reduction scheme can achieve up to 94% cognitive load estimation accuracy.

  17. How Do Contractors Select Suppliers for Greener Construction Projects? The Case of Three Swedish Companies

    Directory of Open Access Journals (Sweden)

    Shahin Mokhlesian

    2014-06-01

    Full Text Available There are many studies of contractor selection based on clients and the selection of suppliers by contractors. However, supplier selection specifically related to green construction projects has been much less studied. Green construction differs from conventional construction because of differences in its underlying principles and use of environmentally-friendly materials and technologies. This paper studies how procurers in contractor companies in Sweden adopt green projects and how contractor perception of supplier mastery of green knowledge affects supplier selection. The investigation is based on a set of semi-structured interviews conducted among three large contractors in Sweden. A main finding is that the perceived differences between green and conventional projects do not change supplier selection dramatically. An implication is that “greener projects” is a more appropriate denotation than “green project”. Evidence shows that suppliers’ green knowledge is an important factor in supplier selection, as respondents rated suppliers’ knowledge of green projects as very important, and to fix his, there was a consensus among respondents about the need for close collaboration between contractors and suppliers. To ensure knowledge acquisition from suppliers and to increase their competitive advantage over rivals, contractors collaborate with their suppliers in a partnering setting. It is anticipated that the results of this study will be used to fill the gap in the literature on supplier selection in green projects and can also be used for construction firms contemplating getting involved in green projects.

  18. An analysis of project selection and assignment criteria of Danish tenders in Europe

    Directory of Open Access Journals (Sweden)

    Jasper Kranker Larsen

    2013-12-01

    Full Text Available Public construction agencies are one of the largest developers within the Danish construction industry, where such agencies own and develop new public construction projects. Most of these projects are put out in European tender. This study analyses the selection and assignment criteria employed by these agencies in different types of public sector projects. Some of the objectives pursued by the study include the determination of 1/ the selection and assignment criteria mostly used in Danish public tenders 2/ how different types of projects use selection and assignment criteria in the bidding process, and 3/ any significant difference between the use of selection and assignment criteria in Danish public construction projects. The study uses a quantitative research approach where 157 Danish public tender cases were selected from the European Tenders Electronic Daily database between the period: January 2010 to March 2013. Fisher's Exact Test was conducted to determine if there was any significant use of some selection and assignment criteria. The findings of the study showed that invited tenders with pre-qualification and lowest price in 69.8% of the tenders are the most used selection and assignment criteria, with little regard to project type.

  19. IT Project Management from a Systems Thinking Perspective

    NARCIS (Netherlands)

    van Eck, Pascal; Ponisio, Laura

    2008-01-01

    Purpose: We proposes a Systems Thinking approach to the study of IT project management and show how this approach helps project managers in controlling their projects. Systems Thinking is a holistic problem solving method in which system behaviour emerges from the interaction of system components.

  20. Consonance in Information System Projects: A Relationship Marketing Perspective

    Science.gov (United States)

    Lin, Pei-Ying

    2010-01-01

    Different stakeholders in the information system project usually have different perceptions and expectations of the projects. There is seldom consistency in the stakeholders' evaluations of the project outcome. Thus the outcomes of information system projects are usually disappointing to one or more stakeholders. Consonance is a process that can…

  1. Mission Need Statement: Calcine Disposition Project Major Systems Acquisition Project

    International Nuclear Information System (INIS)

    J. T. Beck

    2007-01-01

    This document identifies the need to establish the Calcine Disposition Project to determine and implement the final disposition of calcine including characterization, retrieval, treatment (if necessary), packaging, loading, onsite interim storage pending shipment to a repository or interim storage facility, and disposition of related facilities

  2. The Expert Project Management System (EPMS)

    Science.gov (United States)

    Silverman, Barry G.; Diakite, Coty

    1986-01-01

    Successful project managers (PMs) have been shown to rely on 'intuition,' experience, and analogical reasoning heuristics. For new PMs to be trained and experienced PMs to avoid repeating others' mistakes, it is necessary to make the knowledge and heuristics of successful PMs more widely available. The preparers have evolved a model of PM thought processes over the last decade that is now ready to be implemented as a generic PM aid. This aid consists of a series of 'specialist' expert systems (CRITIC, LIBRARIAN, IDEA MAN, CRAFTSMAN, and WRITER) that communicate with each other via a 'blackboard' architecture. The various specialist expert systems are driven to support PM training and problem solving since any 'answers' they pass to the blackboard are subjected to conflict identification (AGENDA FORMULATOR) and GOAL SETTER inference engines.

  3. Machine-Vision Systems Selection for Agricultural Vehicles: A Guide

    Directory of Open Access Journals (Sweden)

    Gonzalo Pajares

    2016-11-01

    Full Text Available Machine vision systems are becoming increasingly common onboard agricultural vehicles (autonomous and non-autonomous for different tasks. This paper provides guidelines for selecting machine-vision systems for optimum performance, considering the adverse conditions on these outdoor environments with high variability on the illumination, irregular terrain conditions or different plant growth states, among others. In this regard, three main topics have been conveniently addressed for the best selection: (a spectral bands (visible and infrared; (b imaging sensors and optical systems (including intrinsic parameters and (c geometric visual system arrangement (considering extrinsic parameters and stereovision systems. A general overview, with detailed description and technical support, is provided for each topic with illustrative examples focused on specific applications in agriculture, although they could be applied in different contexts other than agricultural. A case study is provided as a result of research in the RHEA (Robot Fleets for Highly Effective Agriculture and Forestry Management project for effective weed control in maize fields (wide-rows crops, funded by the European Union, where the machine vision system onboard the autonomous vehicles was the most important part of the full perception system, where machine vision was the most relevant. Details and results about crop row detection, weed patches identification, autonomous vehicle guidance and obstacle detection are provided together with a review of methods and approaches on these topics.

  4. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  5. Strategic project selection based on evidential reasoning approach for high-end equipment manufacturing industry

    Directory of Open Access Journals (Sweden)

    Lu Guangyan

    2017-01-01

    Full Text Available With the rapid development of science and technology, emerging information technologies have significantly changed the daily life of people. In such context, strategic project selection for high-end equipment manufacturing industries faces more and more complexities and uncertainties with the consideration of several complex criteria. For example, a group of experts rather than a single expert should be invited to select strategic project for high-end equipment manufacturing industries and the experts may feel difficulty to express their preferences towards different strategic projects due to their limited cognitive capabilities. In order to handle these complexities and uncertainties, the criteria framework of strategic project selection is firstly constructed based on the characteristics of high-end equipment manufacturing industries and then evidential reasoning (ER approach is introduced in this paper to help experts express their uncertain preferences and aggregate these preferences to generate an appropriate strategic project. A real case of strategic project selection in a high-speed train manufacturing enterprise is investigated to demonstrate the validity of the ER approach in solving strategic project selection problem.

  6. Supplier Selection Using Fuzzy Inference System

    Directory of Open Access Journals (Sweden)

    hamidreza kadhodazadeh

    2014-01-01

    Full Text Available Suppliers are one of the most vital parts of supply chain whose operation has significant indirect effect on customer satisfaction. Since customer's expectations from organization are different, organizations should consider different standards, respectively. There are many researches in this field using different standards and methods in recent years. The purpose of this study is to propose an approach for choosing a supplier in a food manufacturing company considering cost, quality, service, type of relationship and structure standards of the supplier organization. To evaluate supplier according to the above standards, the fuzzy inference system has been used. Input data of this system includes supplier's score in any standard that is achieved by AHP approach and the output is final score of each supplier. Finally, a supplier has been selected that although is not the best in price and quality, has achieved good score in all of the standards.

  7. Integrating System Dynamic and Fuzzy Logic for Economic Assessment of BOT Projects

    Directory of Open Access Journals (Sweden)

    Farnad Nasirzadeh

    2016-03-01

    Full Text Available The selection of the most appropriate project for the investment is one of the most important decisions that should be made by the private investors. This problem is of vital importance in BOT projects, where the total investment as well as the investor's profit should be recovered by the project's income. There are several approaches proposed by the researchers to determine the best economical project in comparison to other projects. The previous researches, however, faced with some major defects. As an example, the effects of various factors affecting the project evaluation process as well as the existing risks and uncertainties are not taken into account. In this research, economic assessment of BOT projects is performed by integrating system dynamic simulation approach and fuzzy logic. For this purpose, first the project's NPV is modeled considering all the influencing factors qualitatively. The relationships that exist between different factors are then determined and the quantitative model is built. Using the developed model, the value of NPV is simulated considering the effects of all the influencing factors and the existing uncertainties. Finally, the value of project's NPV is determined as a triangular fuzzy number. Finally, the best alternative project is selected by comparing the simulated values of NPV. To evaluate the capabilities and performance of the proposed model, the project economical evaluation is performed for two highway projects and the best project is selected.

  8. Controlled Ecological Life Support System Breadboard Project - 1988

    Science.gov (United States)

    Knott, W. M.

    1989-01-01

    The Controlled Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989-1993 are listed. The biomass production chamber to be used by the project is described.

  9. Competitiveness in organizational integrated computer system project management

    Directory of Open Access Journals (Sweden)

    Zenovic GHERASIM

    2010-06-01

    Full Text Available The organizational integrated computer system project management aims at achieving competitiveness by unitary, connected and personalised treatment of the requirements for this type of projects, along with the adequate application of all the basic management, administration and project planning principles, as well as of the basic concepts of the organisational information management development. The paper presents some aspects of organizational computer systems project management competitiveness with the specific reference to some Romanian companies’ projects.

  10. 76 FR 15961 - Funding Priorities and Selection Criterion; Disability and Rehabilitation Research Projects and...

    Science.gov (United States)

    2011-03-22

    ... priorities and a selection criterion for the Disability and Rehabilitation Research Projects and Centers... outcomes for underserved populations; (4) identify research gaps; (5) identify mechanisms of integrating research and practice; and (6) disseminate findings. This notice proposes two priorities and a selection...

  11. An analysis of project selection and assignment criteria of danish tenders in europe

    DEFF Research Database (Denmark)

    Larsen, Jesper Kranker; Ussing, Lene Faber; Brunø, Thomas Ditlev

    2013-01-01

    , and 3/ any significant difference between the use of selection and assignment criteria in Danish public construction projects. The study uses a quantitative research approach where 157 Danish public tender cases were selected from the European Tenders Electronic Daily database between the period...

  12. Business and Industry Project-Based Capstone Courses: Selecting Projects and Assessing Learning Outcomes

    Science.gov (United States)

    Maleki, Reza A.

    2009-01-01

    This is the first of two articles in which the author shares experiences gained from the development and delivery of a business/industry project-based capstone course. The course integrates research, proposal development and design experience based on knowledge and skills acquired in earlier coursework. The course also incorporates standards and…

  13. Project W-049H Collection System Acceptance Test

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The Acceptance Test Procedure (ATP) Program for Project W-049H covers the following activities: Disposal system, Collection system, Instrumentation and control system. Each activity has its own ATP. The purpose of the ATPs is to verify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. This ATP has been prepared to demonstrate that the Collection System Instrumentation functions as required by project criteria

  14. National Unmanned Aircraft Systems Project Office

    Science.gov (United States)

    Goplen, Susan E.; Sloan, Jeff L.

    2015-01-01

    The U.S. Geological Survey (USGS) National Unmanned Aircraft Systems (UAS) Project Office leads the implementation of UAS technology in the Department of the Interior (DOI). Our mission is to support the transition of UAS into DOI as a new cost-effective tool for collecting remote-sensing data to monitor environmental conditions, respond to natural hazards, recognize the consequences and benefits of land and climate change and conduct wildlife inventories. The USGS is teaming with all DOI agencies and academia as well as local, State, and Tribal governments with guidance from the Federal Aviation Administration and the DOI Office of Aviation Services (OAS) to lead the safe, efficient, costeffective and leading-edge adoption of UAS technology into the scientific research and operational activities of the DOI.

  15. The Earth System Grid Federation (ESGF) Project

    Science.gov (United States)

    Carenton-Madiec, Nicolas; Denvil, Sébastien; Greenslade, Mark

    2015-04-01

    The Earth System Grid Federation (ESGF) Peer-to-Peer (P2P) enterprise system is a collaboration that develops, deploys and maintains software infrastructure for the management, dissemination, and analysis of model output and observational data. ESGF's primary goal is to facilitate advancements in Earth System Science. It is an interagency and international effort led by the US Department of Energy (DOE), and co-funded by National Aeronautics and Space Administration (NASA), National Oceanic and Atmospheric Administration (NOAA), National Science Foundation (NSF), Infrastructure for the European Network of Earth System Modelling (IS-ENES) and international laboratories such as the Max Planck Institute for Meteorology (MPI-M) german Climate Computing Centre (DKRZ), the Australian National University (ANU) National Computational Infrastructure (NCI), Institut Pierre-Simon Laplace (IPSL), and the British Atmospheric Data Center (BADC). Its main mission is to support current CMIP5 activities and prepare for future assesments. The ESGF architecture is based on a system of autonomous and distributed nodes, which interoperate through common acceptance of federation protocols and trust agreements. Data is stored at multiple nodes around the world, and served through local data and metadata services. Nodes exchange information about their data holdings and services, trust each other for registering users and establishing access control decisions. The net result is that a user can use a web browser, connect to any node, and seamlessly find and access data throughout the federation. This type of collaborative working organization and distributed architecture context en-lighted the need of integration and testing processes definition to ensure the quality of software releases and interoperability. This presentation will introduce the ESGF project and demonstrate the range of tools and processes that have been set up to support release management activities.

  16. Selection of executors for realization of individual tasks of the project

    Directory of Open Access Journals (Sweden)

    Asanov Askhat

    2017-01-01

    Full Text Available This article deals with the task of selection of executors for the realization of individual tasks of a new project. A short review of approaches to the estimation of personnel based on intellectual methods is provided. Two approaches to the task solution of executors’ selection are reviewed. The first approach allows considering estimation of competence of potential executors and data about projects that have already been realized. These data and requirements to the tasks of new projects are presented with the help of cognitive map with correspondent vertices. In the article, a methodologic example of the suggested approach use is introduced. The second approach suggests the use of Hopfield’s neural network. Neural networks allow using the already available experience of project activities during realization of new projects.

  17. New Method of Selecting Efficient Project Portfolios in the Presence of Hybrid Uncertainty

    Directory of Open Access Journals (Sweden)

    Bogdan Rębiasz

    2016-01-01

    Full Text Available A new methods of selecting efficient project portfolios in the presence of hybrid uncertainty has been presented. Pareto optimal solutions have been defined by an algorithm for generating project portfolios. The method presented allows us to select efficient project portfolios taking into account statistical and economic dependencies between projects when some of the parameters used in the calculation of effectiveness can be expressed in the form of an interactive possibility distribution and some in the form of a probability distribution. The procedure for processing such hybrid data combines stochastic simulation with nonlinear programming. The interaction between data are modeled by correlation matrices and the interval regression. Economic dependences are taken into account by the equations balancing the production capacity of the company. The practical example presented indicates that an interaction between projects has a significant impact on the results of calculations. (original abstract

  18. How can innovative project delivery systems improve the overall efficiency of GDOT in transportation project delivery?

    Science.gov (United States)

    2013-04-01

    The USDOT and Federal Highway Administration (FHWA) recommend the smart use of innovative project : delivery systems, such as design-build, to improve efficiency and effectiveness of developing transportation : projects. Although design-build provide...

  19. Use of a Knowledge Management System in Waste Management Projects

    International Nuclear Information System (INIS)

    Gruendler, D.; Boetsch, W.U.; Holzhauer, U.; Nies, R.A.

    2006-01-01

    In Germany the knowledge management system 'WasteInfo' about waste management and disposal issues has been developed and implemented. Beneficiaries of 'WasteInfo' are official decision makers having access to a large information pool. The information pool is fed by experts, so called authors This means compiling of information, evaluation and assigning of appropriate properties (metadata) to this information. The knowledge management system 'WasteInfo' has been introduced at the WM04, the operation of 'WasteInfo' at the WM05. The recent contribution describes the additional advantage of the KMS being used as a tool for the dealing with waste management projects. This specific aspect will be demonstrated using a project concerning a comparative analysis of the implementation of repositories in six countries using nuclear power as examples: The information of 'WasteInfo' is assigned to categories and structured according to its origin and type of publication. To use 'WasteInfo' as a tool for the processing the projects, a suitable set of categories has to be developed for each project. Apart from technical and scientific aspects, the selected project deals with repository strategies and policies in various countries, with the roles of applicants and authorities in licensing procedures, with safety philosophy and with socio-economic concerns. This new point of view has to be modelled in the categories. Similar to this, new sources of information such as local and regional dailies or particular web-sites have to be taken into consideration. In this way 'WasteInfo' represents an open document which reflects the current status of the respective repository policy in several countries. Information with particular meaning for the German repository planning is marked and by this may influence the German strategy. (authors)

  20. Selection of fluids for tritium pumping systems

    International Nuclear Information System (INIS)

    Chastagner, P.

    1984-02-01

    The degradation characteristics of three types of vacuum pump fluids, polyphenyl ethers, perfluoropolyethers and hydrocarbon oils were reviewed. Fluid selection proved to be a critical factor in the long-term performance of tritium pumping systems and subsequent tritium recovery operations. Thermal degradation and tritium radiolysis of pump fluids produce contaminants which can damage equipment and interfere with tritium recovery operations. General characteristics of these fluids are as follows: polyphenyl ether has outstanding radiation resistance, is very stable under normal diffusion pump conditions, but breaks down in the presence of oxygen at anticipated operating temperatures. Perfluoropolyether fluids are very stable and do not react chemically with most gases. Thermal and mechanical degradation products are inert, but the radiolysis products are very corrosive. Most of the degradation products of hydrogen oils are volatile and the principal radiolysis product is methane. Our studies show that polyphenyl ethers and hydrocarbon oils are the preferred fluids for use in tritium pumping systems. No corrosive materials are formed and most of the degradation products can be removed with suitable filter systems

  1. Process for Selecting System Level Assessments for Human System Technologies

    Science.gov (United States)

    Watts, James; Park, John

    2006-01-01

    The integration of many life support systems necessary to construct a stable habitat is difficult. The correct identification of the appropriate technologies and corresponding interfaces is an exhaustive process. Once technologies are selected secondary issues such as mechanical and electrical interfaces must be addressed. The required analytical and testing work must be approached in a piecewise fashion to achieve timely results. A repeatable process has been developed to identify and prioritize system level assessments and testing needs. This Assessment Selection Process has been defined to assess cross cutting integration issues on topics at the system or component levels. Assessments are used to identify risks, encourage future actions to mitigate risks, or spur further studies.

  2. The APOSTLE project: Local Group kinematic mass constraints and simulation candidate selection

    Science.gov (United States)

    Fattahi, Azadeh; Navarro, Julio F.; Sawala, Till; Frenk, Carlos S.; Oman, Kyle A.; Crain, Robert A.; Furlong, Michelle; Schaller, Matthieu; Schaye, Joop; Theuns, Tom; Jenkins, Adrian

    2016-03-01

    We use a large sample of isolated dark matter halo pairs drawn from cosmological N-body simulations to identify candidate systems whose kinematics match that of the Local Group (LG) of galaxies. We find, in agreement with the `timing argument' and earlier work, that the separation and approach velocity of the Milky Way (MW) and Andromeda (M31) galaxies favour a total mass for the pair of ˜5 × 1012 M⊙. A mass this large, however, is difficult to reconcile with the small relative tangential velocity of the pair, as well as with the small deceleration from the Hubble flow observed for the most distant LG members. Halo pairs that match these three criteria have average masses a factor of ˜2 times smaller than suggested by the timing argument, but with large dispersion. Guided by these results, we have selected 12 halo pairs with total mass in the range 1.6-3.6 × 1012 M⊙ for the APOSTLE project (A Project Of Simulating The Local Environment), a suite of hydrodynamical resimulations at various numerical resolution levels (reaching up to ˜104 M⊙ per gas particle) that use the subgrid physics developed for the EAGLE project. These simulations reproduce, by construction, the main kinematics of the MW-M31 pair, and produce satellite populations whose overall number, luminosities, and kinematics are in good agreement with observations of the MW and M31 companions. The APOSTLE candidate systems thus provide an excellent testbed to confront directly many of the predictions of the Λ cold dark matter cosmology with observations of our local Universe.

  3. New Project System for Undergraduate Electronic Engineering

    Science.gov (United States)

    Chiu, Dirk M.; Chiu, Shen Y.

    2005-01-01

    A new approach to projects for undergraduate electronic engineering in an Australian university has been applied successfully for over 10 years. This approach has a number of projects running over three year period. Feedback from past graduates and their managers has confirmed that these projects train the students well, giving them the ability…

  4. A Multidisciplinary Research Team Approach to Computer-Aided Drafting (CAD) System Selection. Final Report.

    Science.gov (United States)

    Franken, Ken; And Others

    A multidisciplinary research team was assembled to review existing computer-aided drafting (CAD) systems for the purpose of enabling staff in the Design Drafting Department at Linn Technical College (Missouri) to select the best system out of the many CAD systems in existence. During the initial stage of the evaluation project, researchers…

  5. Exploration Medical System Demonstration (EMSD) Project

    Science.gov (United States)

    Chin, Duane

    2012-01-01

    The Exploration Medical System Demonstration (EMSD) is a project under the Exploration Medical Capability (ExMC) element managed by the Human Research Program (HRP). The vision for the EMSD is to utilize ISS as a test bed to show that several medical technologies needed for an exploration mission and medical informatics tools for managing evidence and decision making can be integrated into a single system and used by the on-orbit crew in an efficient and meaningful manner. Objectives: a) Reduce and even possibly eliminate the time required for on-orbit crew and ground personnel (which include Surgeon, Biomedical Engineer (BME) Flight Controller, and Medical Operations Data Specialist) to access and move medical data from one application to another. b) Demonstrate that the on-orbit crew has the ability to access medical data/information using an intuitive and crew-friendly software solution to assist/aid in the treatment of a medical condition. c) Develop a common data management framework and architecture that can be ubiquitously used to automate repetitive data collection, management, and communications tasks for all crew health and life sciences activities.

  6. Integrating configuration workflows with project management system

    International Nuclear Information System (INIS)

    Nilsen, Dimitri; Weber, Pavel

    2014-01-01

    The complexity of the heterogeneous computing resources, services and recurring infrastructure changes at the GridKa WLCG Tier-1 computing center require a structured approach to configuration management and optimization of interplay between functional components of the whole system. A set of tools deployed at GridKa, including Puppet, Redmine, Foreman, SVN and Icinga, provides the administrative environment giving the possibility to define and develop configuration workflows, reduce the administrative effort and improve sustainable operation of the whole computing center. In this presentation we discuss the developed configuration scenarios implemented at GridKa, which we use for host installation, service deployment, change management procedures, service retirement etc. The integration of Puppet with a project management tool like Redmine provides us with the opportunity to track problem issues, organize tasks and automate these workflows. The interaction between Puppet and Redmine results in automatic updates of the issues related to the executed workflow performed by different system components. The extensive configuration workflows require collaboration and interaction between different departments like network, security, production etc. at GridKa. Redmine plugins developed at GridKa and integrated in its administrative environment provide an effective way of collaboration within the GridKa team. We present the structural overview of the software components, their connections, communication protocols and show a few working examples of the workflows and their automation.

  7. Selection of procurement systems in the South African construction industry: An exploratory study

    Directory of Open Access Journals (Sweden)

    W. D. Thwala

    2012-12-01

    Full Text Available Purpose of this paper: Procurement systems are vital in ensuring the successful implementation of construction projects precisely in all the phases of any particular project. Therefore, this paper aims to investigate in a systematic manner the factors that influence the selection of a procurement system in the South African construction industry. Research methodology: An extensive theory and literature review of procurement systems was conducted. The literature reviewed included a sample of case studies of procurement systems successfully implemented in completed building and civil engineering projects in South Africa. A questionnaire using a four-round Delphi survey method was used to conduct the empirical study in order to obtain participants' opinions about factors influencing the selection of procurement systems as well as the utility value of various procurement systems on each factor as identified. Finally, data analysis of both qualitative and quantitative techniques was performed using the Statistical Package for Social Sciences (SPSS. Findings: After qualitative analysis, findings of the literature reviewed suggest that factors that influence the selection of procurement systems cut across all the phases of the project as identified in this paper. Therefore, these factors are categorically classified into internal and external factors. Factors from the internal environment were further classified into client characteristics and project characteristics, with client characteristics comprising of variables such as clients' level of knowledge and control, political and social consideration, familiarity of procurement systems, competition, funding arrangement, government public/private sector projects and risk allocation whereas project characteristics comprise of factors (variables such as size and technical complexity of the project, influence of the project life cycle, expedited project delivery, time, quality and price certainty. Factors

  8. Risk Management System and Project Staff Education Program for Overseas Construction Project Using the Expert System

    OpenAIRE

    Hirota, Yoichi

    2007-01-01

    The turnover of the Japanese contractors and the consulting firms has kept the same level since 1983, in spite of the fact that the size of domestic market is shrinking. This is why they do not have a proper management system, especially risk management system for the overseas construction projects. This study aims at building risk management system and developing education program that can be applied to reinforcing the ability, based on the author’s experience. Risk is defined as “uncertain ...

  9. A Symbiosis between Instructional Systems Design and Project Management

    Science.gov (United States)

    Pan, Cheng-Chang

    2012-01-01

    This study is intended to explore a complementary relationship between instructional systems design (ISD) and project management in an attempt to build a plausible case for integrating project management as a distinct course in the core of the graduate instructional systems design programs. It is argued that ISD and project management should form…

  10. Materials selection guidelines for geothermal energy utilization systems

    Energy Technology Data Exchange (ETDEWEB)

    Ellis, P.F. II; Conover, M.F.

    1981-01-01

    This manual includes geothermal fluid chemistry, corrosion test data, and materials operating experience. Systems using geothermal energy in El Salvador, Iceland, Italy, Japan, Mexico, New Zealand, and the United States are described. The manual provides materials selection guidelines for surface equipment of future geothermal energy systems. The key chemical species that are significant in determining corrosiveness of geothermal fluids are identified. The utilization modes of geothermal energy are defined as well as the various physical fluid parameters that affect corrosiveness. Both detailed and summarized results of materials performance tests and applicable operating experiences from forty sites throughout the world are presented. The application of various non-metal materials in geothermal environments are discussed. Included in appendices are: corrosion behavior of specific alloy classes in geothermal fluids, corrosion in seawater desalination plants, worldwide geothermal power production, DOE-sponsored utilization projects, plant availability, relative costs of alloys, and composition of alloys. (MHR)

  11. Selection of initial events of accelerator driven subcritical system

    International Nuclear Information System (INIS)

    Wang Qianglong; Hu Liqin; Wang Jiaqun; Li Yazhou; Yang Zhiyi

    2013-01-01

    The Probabilistic Safety Assessment (PSA) is an important tool in reactor safety analysis and a significant reference to the design and operation of reactor. It is the origin and foundation of the PSA for a reactor to select the initial events. Accelerator Driven Subcritical System (ADS) has advanced design characteristics, complicated subsystems and little engineering and operating experience, which makes it much more difficult to identify the initial events of ADS. Based on the current design project of ADS, the system's safety characteristics and special issues were analyzed in this article. After a series of deductions with Master Logic Diagram (MLD) and considering the relating experience of other advanced research reactors, a preliminary initial events was listed finally, which provided the foundation for the next safety assessment. (authors)

  12. A Study on Site Selecting for National Project including High Level Radioactive Waste Disposal

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kilyoo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    Many national projects are stopped since sites for the projects are not determined. The sites selections are hold by NIMBY for unpleasant facilities or by PYMFY for preferable facilities among local governments. The followings are the typical ones; NIMBY projects: high level radioactive waste disposal, THAAD, Nuclear power plant(NPP), etc. PIMFY projects: South-east new airport, KTX station, Research center for NPP decommission, etc. The site selection for high level radioactive waste disposal is more difficult problem, and thus government did not decide and postpone to a dead end street. Since it seems that there is no solution for site selection for high level radioactive waste disposal due to NIMBY among local governments, a solution method is proposed in this paper. To decide a high level radioactive waste disposal, the first step is to invite a bid by suggesting a package deal including PIMFY projects such as Research Center for NPP decommission. Maybe potential host local governments are asked to submit sealed bids indicating the minimum compensation sum that they would accept the high level radioactive waste disposal site. If there are more than one local government put in a bid, then decide an adequate site by considering both the accumulated PESS point and technical evaluation results. By considering how fairly preferable national projects and unpleasant national projects are distributed among local government, sites selection for NIMBY or PIMFY facilities is suggested. For NIMBY national projects, risk, cost benefit analysis is useful and required since it generates cost value to be used in the PESS. For many cases, the suggested method may be not adequate. However, similar one should be prepared, and be basis to decide sites for NIMBY or PIMFY national projects.

  13. 324 Building liquid waste handling and removal system project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ham, J.E.

    1998-07-29

    This report evaluates the modification options for handling radiological liquid waste generated during decontamination and cleanout of the 324 Building. Recent discussions indicate that the Hanford site railroad system will be closed by the end of FY 1998 necessitating the need for an alternate transfer method. The issue of handling of Radioactive Liquid Waste (RLW) from the 324 Building (assuming the 340 Facility is not available to accept the RLW) has been examined in at least two earlier engineering studies (Parsons 1997a and Hobart 1997). Each study identified a similar preferred alternative that included modifying the 324 Building RLWS to allow load-out of wastewater to a truck tanker, while making maximum use of existing piping, tanks, instrumentation, controls and other features to minimize costs and physical changes to the building. This alternative is accepted as the basis for further discussion presented in this study. The goal of this engineering study is to verify the path forward presented in the previous studies and assure that the selected alternative satisfies the 324 Building deactivation goals and objectives as currently described in the project management plan. This study will also evaluate options available to implement the preferred alternative and select the preferred option for implementation of the entire system. Items requiring further examination will also be identified. Finally, the study will provide a conceptual design, schedule and cost estimate for the required modifications to the 324 Building to allow removal of RLW. Attachment 5 is an excerpt from the project baseline schedule found in the Project Management Plan.

  14. Optimized design of total energy systems: The RETE project

    Science.gov (United States)

    Alia, P.; Dallavalle, F.; Denard, C.; Sanson, F.; Veneziani, S.; Spagni, G.

    1980-05-01

    The RETE (Reggio Emilia Total Energy) project is discussed. The total energy system (TES) was developed to achieve the maximum quality matching on the thermal energy side between plant and user and perform an open scheme on the electrical energy side by connection with the Italian electrical network. The most significant qualitative considerations at the basis of the plant economic energy optimization and the selection of the operating criterion most fitting the user consumption characteristics and the external system constraints are reported. The design methodology described results in a TES that: in energy terms achieves a total efficiency evaluated on a yearly basis to be equal to about 78 percent and a fuel saving of about 28 percent and in economic terms allows a recovery of the investment required as to conventional solutions, in about seven years.

  15. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  16. Project Design Concept for Monitoring and Control System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations

  17. Solving Conic Systems via Projection and Rescaling

    OpenAIRE

    Pena, Javier; Soheili, Negar

    2015-01-01

    We propose a simple projection and rescaling algorithm to solve the feasibility problem \\[ \\text{ find } x \\in L \\cap \\Omega, \\] where $L$ and $\\Omega$ are respectively a linear subspace and the interior of a symmetric cone in a finite-dimensional vector space $V$. This projection and rescaling algorithm is inspired by previous work on rescaled versions of the perceptron algorithm and by Chubanov's projection-based method for linear feasibility problems. As in these predecessors, each main it...

  18. Information systems project management: methods, tools, and techniques

    OpenAIRE

    Mcmanus, John; Wood-Harper, Trevor

    2004-01-01

    Information Systems Project Management offers a clear and logical exposition of how to plan, organise and monitor projects effectively in order to deliver quality information systems within time, to budget and quality. This new book by John McManus and Trevor Wood-Harper is suitable for upper level undergraduates and postgraduates studying project management and Information Systems. Practising managers will also find it to be a valuable tool in their work. Managing information systems pro...

  19. Project Selection and Transparency Factors in Housing Public-Private Partnerships in Nigeria

    Directory of Open Access Journals (Sweden)

    Eziyi Offia Ibem

    2018-06-01

    Full Text Available The application of Public-Private Partners (PPPs in housing provisioning is on the increase across the world. However, there is a paucity of empirical studies on the specific factors considered at the initiation, and measures taken to ensure transparency at the procurement stages, of PPP housing projects. This study examined project selection factors and transparency measures in PPP housing projects using data sourced from oral interviews with 27 experts in nine PPP housing schemes in Nigeria. Results of the content analysis revealed that the top two selection factors considered by both the public and private sector operators of PPP housing projects in Nigeria are the availability of land and viability of the funding arrangements. Whereas the public-sector partners also consider the availability of competent private sector to deliver the projects, the private developers are concerned with the location of proposed projects. It was also found that the two key measures taken to ensure transparency at the procurement stage of the projects are transparent and competitive bidding and open advertisements of tender opportunities. These imply that before embarking on PPP housing projects, operators should ensure that there is available land in good locations, sound funding arrangements, and measures for achieving transparency in the schemes.

  20. Phase selection in the mushy-zone: LODESTARS and ELFSTONE projects

    International Nuclear Information System (INIS)

    Matson, D M; Hyers, R W; Volkmann, T; Fecht, H-J

    2011-01-01

    In a collaboration sponsored by ESA and NASA, international partners have developed a work plan to successfully address key issues relating to understanding the role of convection on alloy phase selection for commercially important structural alloys using the MSL-EML facility aboard the International Space Station. The approach is two-pronged. First, ground and space-based experiments will develop a baseline database to anchor subsequent modelling predictions. Tasks include sample preparation and verification, ground-based transformation evaluation, space-based experiments, and thermophysical property evaluation to support modelling activities. Second, modelling and theoretical analysis tasks will lead to a new understanding of the role of convection in phase selection for this class of materials. These models will allow prediction and control of microstructural evolution during solidification processing. Tasks include modelling of macroconvection induced by the EM levitation field, modelling of microconvection within the dendrite array, nucleation modelling, and modelling of the transformation kinetics specific to each alloy system. This paper outlines how two NASA-sponsored projects relate to the goals of the international collaboration.

  1. Phase selection in the mushy-zone: LODESTARS and ELFSTONE projects

    Science.gov (United States)

    Matson, D. M.; Hyers, R. W.; Volkmann, T.; Fecht, H.-J.

    2011-12-01

    In a collaboration sponsored by ESA and NASA, international partners have developed a work plan to successfully address key issues relating to understanding the role of convection on alloy phase selection for commercially important structural alloys using the MSL-EML facility aboard the International Space Station. The approach is two-pronged. First, ground and space-based experiments will develop a baseline database to anchor subsequent modelling predictions. Tasks include sample preparation and verification, ground-based transformation evaluation, space-based experiments, and thermophysical property evaluation to support modelling activities. Second, modelling and theoretical analysis tasks will lead to a new understanding of the role of convection in phase selection for this class of materials. These models will allow prediction and control of microstructural evolution during solidification processing. Tasks include modelling of macroconvection induced by the EM levitation field, modelling of microconvection within the dendrite array, nucleation modelling, and modelling of the transformation kinetics specific to each alloy system. This paper outlines how two NASA-sponsored projects relate to the goals of the international collaboration.

  2. Projective measurements in quantum and classical optical systems

    CSIR Research Space (South Africa)

    Roux, FS

    2014-09-01

    Full Text Available equally well to both classical and quantum optical systems. A projective measurement, in the context of quantum mechanics, is understood to be the process where a projection operator operates on some input state. Often this projection operator is composed...) Projective measurements in quantum and classical optical systems Filippus S. Roux* and Yingwen Zhang CSIR National Laser Centre, P.O. Box 395, Pretoria 0001, South Africa (Received 3 July 2014; published 22 September 2014) Experimental setups for the optical...

  3. Controlled ecological life support system breadboard project, 1988

    Science.gov (United States)

    Knott, W. M.

    1990-01-01

    The Closed Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989 to 1993 are listed. The Biomass Production Chamber (BPC) became operational and tests of wheat as a single crop are nearing completion.

  4. Project evaluation and selection using fuzzy Delphi method and zero - one goal programming

    Science.gov (United States)

    Alias, Suriana; Adna, Nofarziah; Arsad, Roslah; Soid, Siti Khuzaimah; Ali, Zaileha Md

    2014-12-01

    Project evaluation and selection is a factor affecting the impotence of board director in which is trying to maximize all the possible goals. Assessment of the problem occurred in organization plan is the first phase for decision making process. The company needs a group of expert to evaluate the problems. The Fuzzy Delphi Method (FDM) is a systematic procedure to evoke the group's opinion in order to get the best result to evaluate the project performance. This paper proposes an evaluation and selection of the best alternative project based on combination of FDM and Zero - One Goal Programming (ZOGP) formulation. ZOGP is used to solve the multi-criteria decision making for final decision part by using optimization software LINDO 6.1. An empirical example on an ongoing decision making project in Johor, Malaysia is implemented for case study.

  5. Organ Donation European Quality System: ODEQUS project methodology.

    Science.gov (United States)

    Manyalich, M; Guasch, X; Gomez, M P; Páez, G; Teixeira, L

    2013-01-01

    Differences in the number of organ donors among hospitals cannot be explained only by the number of intensive care unit beds used or neurologic patients treated. The figures obtained are influenced by the organizational structure of the donation process and how efficient it is. The Organ Donation European Quality System (ODEQUS) is a 3-year project (from October 2010 to September 2013) co-financed by the European Agency for Health and Consumers (EAHC20091108) which aims to define a methodology to evaluate organ procurement performance at the hospital level. ODEQUS's specific objectives are to identify quality criteria and to develop quality indicators in three types of organ donation (after brain death, after cardiac death, and living donation). Those tools will be useful for hospitals' self-assessment as well as for developing an international auditing model. A consortium has been established involving 14 associated partners from Austria, Croatia, France, Germany, Italy, Poland, Portugal, Romania, Spain, Sweden, and the United Kingdom, as well as five collaborating partners from Greece, Hungary, Malta, Slovenia, and Turkey. The project has been established in three steps: 1) Design of a survey about the use of quality tools in a wide sample of European hospitals; 2) Development of quality criteria and quality indicators by the project experts. The main fields considered have been organizational structures, clinical procedures, and outcomes; and 3) Elaboration of an evaluation system to test the quality indicators in 11 European hospitals. Two types of training have been designed and performed: one concerns the development of quality criteria and quality indicators, whereas another is focused on how to use evaluation tools. Following this methodology, the project has so far identified 131 quality criteria and developed 31 quality indicators. Currently, the quality indicators are being tested in 11 selected hospitals. Copyright © 2013 Elsevier Inc. All rights

  6. Bibliography of the SAIL Panama Canal Zone Project 2008 : a selected bibliography.

    OpenAIRE

    DeHart, Liz

    2009-01-01

    During the 18th Annual 2008 SAIL meeting at the Smithsonian Tropical Research Institute in Panama, Vielka Chang-Yau, librarian, mentioned the need to digitize and make available through the Aquatic Commons some of the early documents related to the U.S. biological survey of Panama from 1910 to 1912. With the assistance of SAIL, a regional marine librarian’s group, a digital project developed and this select bibliography represents the sources used for the project. It will assist research...

  7. ERP systems selection in multinational enterprises: a practical guide

    OpenAIRE

    Moutaz Haddara

    2018-01-01

    The Enterprise Resource Planning (ERP) system selection is an early phase in the ERP adoption process. When organizations evaluate an ERP, they commonly develop their own selection criteria that usually involve various system and vendor related factors. While the selection process is critical, however, there is an apparent research gap in literature. The ERP selection effort also focuses on the system’s fit with the organizational requirements and needs. Thus, the selection phase is critical,...

  8. A process for selection and training of super-users for ERP implementation projects

    DEFF Research Database (Denmark)

    Danielsen, Peter; Sandfeld Hansen, Kenneth; Helt, Mads

    2017-01-01

    The concept of super-users as a means to facilitate ERP implementation projects has recently taken a foothold in practice, but is still largely overlooked in research. In particular, little is known about the selection and training processes required to successfully develop skilled super-users in......The concept of super-users as a means to facilitate ERP implementation projects has recently taken a foothold in practice, but is still largely overlooked in research. In particular, little is known about the selection and training processes required to successfully develop skilled super...

  9. Integrating workflow and project management systems for PLM applications

    Directory of Open Access Journals (Sweden)

    Fabio Fonseca Pereira de Paula

    2008-07-01

    Full Text Available The adoption of Product Life-cycle Management Systems (PLMs concept is fundamental to improve the product development, mainly to small and medium enterprises (SMEs. One of the challenges is the integration between project management and product data management functions. The paper presents an analysis of the potential integration strategies for a specifics product data management system (SMARTEAM and a project management system (Microsoft Project, which are commonly used for SMEs. Finally the article presents some considerations about the study of Project Management solutions in SMB’s companies, considering the PLM approach. Key-words: integration, project management (PM, workflow, PDM, PLM.

  10. The Analysis of Project Finance: a Case Study of Kazakhstan Caspian Transportation System Project

    OpenAIRE

    Serikbayeva, Aigul

    2011-01-01

    Although project finance is a large and fast growing field in finance, there has been very little academic research in that area. The main reason for this deficit is that it is a relatively new sphere in finance and it is difficult to access the information about the implementation of projects from the companies that implement them. This project will provide an overview of how companies finance large infrastructure projects through a case study of the Kazakhstan Caspian Transportation System ...

  11. Laser display system for multi-depth screen projection scenarios.

    Science.gov (United States)

    La Torre, J Pablo; Mayes, Nathan; Riza, Nabeel A

    2017-11-10

    Proposed is a laser projection display system that uses an electronically controlled variable focus lens (ECVFL) to achieve sharp and in-focus image projection over multi-distance three-dimensional (3D) conformal screens. The system also functions as an embedded distance sensor that enables 3D mapping of the multi-level screen platform before the desired laser scanned beam focused/defocused projected spot sizes are matched to the different localized screen distances on the 3D screen. Compared to conventional laser scanning and spatial light modulator (SLM) based projection systems, the proposed design offers in-focus non-distorted projection over a multi-distance screen zone with varying depths. An experimental projection system for a screen depth variation of 65 cm is demonstrated using a 633 nm laser beam, 3 KHz scan speed galvo-scanning mirrors, and a liquid-based ECVFL. As a basic demonstration, an in-house developed MATLAB based graphic user interface is deployed to work along with the laser projection display, enabling user inputs like text strings or predefined image projection. The user can specify projection screen distance, scanned laser linewidth, projected text font size, projected image dimensions, and laser scanning rate. Projected images are shown highlighting the 3D control capabilities of the display, including the production of a non-distorted image onto two-depths versus a distorted image via dominant prior-art projection methods.

  12. System driven technology selection for future European launch systems

    Science.gov (United States)

    Baiocco, P.; Ramusat, G.; Sirbi, A.; Bouilly, Th.; Lavelle, F.; Cardone, T.; Fischer, H.; Appel, S.

    2015-02-01

    In the framework of the next generation launcher activity at ESA, a top-down approach and a bottom-up approach have been performed for the identification of promising technologies and alternative conception of future European launch vehicles. The top-down approach consists in looking for system-driven design solutions and the bottom-up approach features design solutions leading to substantial advantages for the system. The main investigations have been focused on the future launch vehicle technologies. Preliminary specifications have been used in order to permit sub-system design to find the major benefit for the overall launch system. The development cost, non-recurring and recurring cost, industrialization and operational aspects have been considered as competitiveness factors for the identification and down-selection of the most interesting technologies. The recurring cost per unit payload mass has been evaluated. The TRL/IRL has been assessed and a preliminary development plan has been traced for the most promising technologies. The potentially applicable launch systems are Ariane and VEGA evolution. The main FLPP technologies aim at reducing overall structural mass, increasing structural margins for robustness, metallic and composite containment of cryogenic hydrogen and oxygen propellants, propellant management subsystems, elements significantly reducing fabrication and operational costs, avionics, pyrotechnics, etc. to derive performing upper and booster stages. Application of the system driven approach allows creating performing technology demonstrators in terms of need, demonstration objective, size and cost. This paper outlines the process of technology down selection using a system driven approach, the accomplishments already achieved in the various technology fields up to now, as well as the potential associated benefit in terms of competitiveness factors.

  13. ARTIFICIAL NEURAL NETWORKS BASED GEARS MATERIAL SELECTION HYBRID INTELLIGENT SYSTEM

    Institute of Scientific and Technical Information of China (English)

    X.C. Li; W.X. Zhu; G. Chen; D.S. Mei; J. Zhang; K.M. Chen

    2003-01-01

    An artificial neural networks(ANNs) based gear material selection hybrid intelligent system is established by analyzing the individual advantages and weakness of expert system (ES) and ANNs and the applications in material select of them. The system mainly consists of tow parts: ES and ANNs. By being trained with much data samples,the back propagation (BP) ANN gets the knowledge of gear materials selection, and is able to inference according to user input. The system realizes the complementing of ANNs and ES. Using this system, engineers without materials selection experience can conveniently deal with gear materials selection.

  14. Real-time operating system for selected Intel processors

    Science.gov (United States)

    Pool, W. R.

    1980-01-01

    The rationale for system development is given along with reasons for not using vendor supplied operating systems. Although many system design and performance goals were dictated by problems with vendor supplied systems, other goals surfaced as a result of a design for a custom system able to span multiple projects. System development and management problems and areas that required redesign or major code changes for system implementation are examined as well as the relative successes of the initial projects. A generic description of the actual project is provided and the ongoing support requirements and future plans are discussed.

  15. Project of neural network for steel grade selection with the assumed CCT diagram

    OpenAIRE

    S. Malara; L.A. Dobrzański; J. Trzaska

    2008-01-01

    Purpose: The aim of this paper was developing a project of neural network for selection of steel grade with the specified CCT diagram – structure and of harness after heat treatment.Design/methodology/approach: The goal has been achieved in the following stages: at the first stage characteristic points of CCT diagram have been determined. At the second stage neural network has been developed and optimized.Findings: The neural network was developed in this paper, that allowed selection of stee...

  16. Virtual fringe projection system with nonparallel illumination based on iteration

    International Nuclear Information System (INIS)

    Zhou, Duo; Wang, Zhangying; Gao, Nan; Zhang, Zonghua; Jiang, Xiangqian

    2017-01-01

    Fringe projection profilometry has been widely applied in many fields. To set up an ideal measuring system, a virtual fringe projection technique has been studied to assist in the design of hardware configurations. However, existing virtual fringe projection systems use parallel illumination and have a fixed optical framework. This paper presents a virtual fringe projection system with nonparallel illumination. Using an iterative method to calculate intersection points between rays and reference planes or object surfaces, the proposed system can simulate projected fringe patterns and captured images. A new explicit calibration method has been presented to validate the precision of the system. Simulated results indicate that the proposed iterative method outperforms previous systems. Our virtual system can be applied to error analysis, algorithm optimization, and help operators to find ideal system parameter settings for actual measurements. (paper)

  17. Adaptive projective synchronization of different chaotic systems with nonlinearity inputs

    International Nuclear Information System (INIS)

    Niu Yu-Jun; Pei Bing-Nan; Wang Xing-Yuan

    2012-01-01

    We investigate the projective synchronization of different chaotic systems with nonlinearity inputs. Based on the adaptive technique, sliding mode control method and pole assignment technique, a novel adaptive projective synchronization scheme is proposed to ensure the drive system and the response system with nonlinearity inputs can be rapidly synchronized up to the given scaling factor. (general)

  18. Systems approach for design control at Monitored Retrievable Storage Project

    International Nuclear Information System (INIS)

    Kumar, P.N.; Williams, J.R.

    1994-01-01

    This paper describes the systems approach in establishing design control for the Monitored Retrievable Storage Project design development. Key elements in design control are enumerated and systems engineering aspects are detailed. Application of lessons learned from the Yucca Mountain Project experience is addressed. An integrated approach combining quality assurance and systems engineering requirements is suggested to practice effective design control

  19. Spent Nuclear Fuel project systems engineering management plan

    International Nuclear Information System (INIS)

    Womack, J.C.

    1995-01-01

    The purpose of the WHC Systems Engineering Management Plan (SEMP) is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices to enhance the WHC engineering management of the SNF Project. The scope of the SEMP encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project. This implementation applies to, and is tailored to the needs of the SNF project and all its subprojects, including all current and future subprojects

  20. The SIMPSONS project: An integrated Mars transportation system

    Science.gov (United States)

    Kaplan, Matthew; Carlson, Eric; Bradfute, Sherie; Allen, Kent; Duvergne, Francois; Hernandez, Bert; Le, David; Nguyen, Quan; Thornhill, Brett

    In response to the Request for Proposal (RFP) for an integrated transportation system network for an advanced Martian base, Frontier Transportation Systems (FTS) presents the results of the SIMPSONS project (Systems Integration for Mars Planetary Surface Operations Networks). The following topics are included: the project background, vehicle design, future work, conclusions, management status, and cost breakdown. The project focuses solely on the surface-to-surface transportation at an advanced Martian base.

  1. A proposed selection process in Over-The-Top project portfolio management

    Directory of Open Access Journals (Sweden)

    Jemy Vestius Confido

    2018-05-01

    Full Text Available Purpose: The purpose of this paper is to propose an Over-The-Top (OTT initiative selection process for communication service providers (CSPs entering an OTT business. Design/methodology/approach: To achieve this objective, a literature review was conducted to comprehend the past and current practices of the project (or initiative selection process as mainly suggested in project portfolio management (PPM. This literature was compared with specific situations and the needs of CSPs when constructing an OTT portfolio. Based on the contrast between the conventional project selection process and specific OTT characteristics, a different selection process is developed and tested using group model-building (GMB, which involved an in-depth interview, a questionnaire and a focus group discussion (FGD. Findings: The paper recommends five distinct steps for CSPs to construct an OTT initiative portfolio: candidate list of OTT initiatives, interdependency diagram, evaluation of all interdependent OTT initiatives, evaluation of all non-interdependent OTT initiatives and optimal portfolio of OTT initiatives. Research limitations/implications: The research is empirical, and various OTT services are implemented; the conclusion is derived only from one CSP, which operates as a group. Generalization of this approach will require further empirical tests on different CSPs, OTT players or any firms performing portfolio selection with a degree of interdependency among the projects. Practical implications: Having considered interdependency, the proposed OTT initiative selection steps can be further implemented by portfolio managers for more effective OTT initiative portfolio construction. Originality/value: While the previous literature and common practices suggest ensuring the benefits (mainly financial of individual projects, this research accords higher priority to the success of the overall OTT initiative portfolio and recommends that an evaluation of the overall

  2. Advanced Ground Systems Maintenance Enterprise Architecture Project

    Science.gov (United States)

    Perotti, Jose M. (Compiler)

    2015-01-01

    The project implements an architecture for delivery of integrated health management capabilities for the 21st Century launch complex. The delivered capabilities include anomaly detection, fault isolation, prognostics and physics based diagnostics.

  3. Tank waste remediation system year 2000 dedicated file server project HNF-3418 project plan

    Energy Technology Data Exchange (ETDEWEB)

    SPENCER, S.G.

    1999-04-26

    The Server Project is to ensure that all TWRS supporting hardware (fileservers and workstations) will not cause a system failure because of the BIOS or Operating Systems cannot process Year 2000 dates.

  4. Tank waste remediation system year 2000 dedicated file server project HNF-3418 project plan

    International Nuclear Information System (INIS)

    SPENCER, S.G.

    1999-01-01

    The Server Project is to ensure that all TWRS supporting hardware (fileservers and workstations) will not cause a system failure because of the BIOS or Operating Systems cannot process Year 2000 dates

  5. The Workplace Literacy System Project (WLS). Final Performance Report.

    Science.gov (United States)

    Poulton, Bruce R.

    The Workplace Literacy System Project (WLS) prepared interactive CD-ROM discs containing about 50 hours of instruction and drill in basic skills presented within the context of the textile/apparel manufacturing industry. The project was conducted at a Sara Lee knit products plant in North Carolina. During the project, literacy task analyses were…

  6. 46 CFR 108.404 - Selection of fire detection system.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Selection of fire detection system. 108.404 Section 108... DESIGN AND EQUIPMENT Fire Extinguishing Systems § 108.404 Selection of fire detection system. (a) If a... space. (b) The fire detection system must be designed to minimize false alarms. ...

  7. Factors Influencing the Selection of the Systems Integration Organizational Model Type for Planning and Implementing Government High-Technology Programs

    Science.gov (United States)

    Thomas, Leann; Utley, Dawn

    2006-01-01

    While there has been extensive research in defining project organizational structures for traditional projects, little research exists to support high technology government project s organizational structure definition. High-Technology Government projects differ from traditional projects in that they are non-profit, span across Government-Industry organizations, typically require significant integration effort, and are strongly susceptible to a volatile external environment. Systems Integration implementation has been identified as a major contributor to both project success and failure. The literature research bridges program management organizational planning, systems integration, organizational theory, and independent project reports, in order to assess Systems Integration (SI) organizational structure selection for improving the high-technology government project s probability of success. This paper will describe the methodology used to 1) Identify and assess SI organizational structures and their success rate, and 2) Identify key factors to be used in the selection of these SI organizational structures during the acquisition strategy process.

  8. Cornell University remote sensing program. [selected research projects in land and water resource management

    Science.gov (United States)

    Liang, T.; Belcher, D. J.; Mcnair, A. J.

    1974-01-01

    The major activities of the program staff from December 1, 1973 to May 31, 1974 are reported and include: (1) communication and instruction; (2) data and facilities; (3) research completed; (4) research in progress; (5) selected correspondence; (6) grant sponsored travel; and (7) seminars and newsletters. Detailed information and maps are given for the following selected projects: (1) ERTS mapping of waterways in the Tug Hill region of New York State; (2) photo-archeological investigation of Great Gully, New York; and (3) evaluation of selected highway impacts using aerial photography.

  9. Collaboration and Virtualization in Large Information Systems Projects

    Directory of Open Access Journals (Sweden)

    Stefan Ioan NITCHI

    2009-01-01

    Full Text Available A project is evolving through different phases from idea and conception until the experiments, implementation and maintenance. The globalization, the Internet, the Web and the mobile computing changed many human activities, and in this respect, the realization of the Information System (IS projects. The projects are growing, the teams are geographically distributed, and the users are heterogeneous. In this respect, the realization of the large Information Technology (IT projects needs to use collaborative technologies. The distribution of the team, the users' heterogeneity and the project complexity determines the virtualization. This paper is an overview of these aspects for large IT projects. It shortly present a general framework developed by the authors for collaborative systems in general and adapted to collaborative project management. The general considerations are illustrated on the case of a large IT project in which the authors were involved.

  10. A planning and scheduling system for the LHC project

    CERN Document Server

    Bachy, Gérard; Tarrant, M

    1995-01-01

    The purpose of this paper is to present modern ways to manage time, resources and progress in a large-scale project. Over the last ten years, new project management techniques and tools have appeared such as concurrent engineering, Continuous Acquisition Lifecycle Support (CALS) and Engineering Data Management System (EDMS). The world downturn of the early 90s influenced project management: increasing constraints on time and budget and more external direction on spending that, for example, requires sophisticated sub-contracting practises. However, the evolution of the software and hardware market makes project control tools cheaper and easier to use. All project groups want to have their scope of work considered as complete projects and to control them themselves. This has several consequences on project staff behaviour concerning project control, and has to be taken into account in every planning process designed today. The system described will be at the heart of the planning and scheduling procedures issue...

  11. Feature Subset Selection and Instance Filtering for Cross-project Defect Prediction - Classification and Ranking

    Directory of Open Access Journals (Sweden)

    Faimison Porto

    2016-12-01

    Full Text Available The defect prediction models can be a good tool on organizing the project's test resources. The models can be constructed with two main goals: 1 to classify the software parts - defective or not; or 2 to rank the most defective parts in a decreasing order. However, not all companies maintain an appropriate set of historical defect data. In this case, a company can build an appropriate dataset from known external projects - called Cross-project Defect Prediction (CPDP. The CPDP models, however, present low prediction performances due to the heterogeneity of data. Recently, Instance Filtering methods were proposed in order to reduce this heterogeneity by selecting the most similar instances from the training dataset. Originally, the similarity is calculated based on all the available dataset features (or independent variables. We propose that using only the most relevant features on the similarity calculation can result in more accurate filtered datasets and better prediction performances. In this study we extend our previous work. We analyse both prediction goals - Classification and Ranking. We present an empirical evaluation of 41 different methods by associating Instance Filtering methods with Feature Selection methods. We used 36 versions of 11 open source projects on experiments. The results show similar evidences for both prediction goals. First, the defect prediction performance of CPDP models can be improved by associating Feature Selection and Instance Filtering. Second, no evaluated method presented general better performances. Indeed, the most appropriate method can vary according to the characteristics of the project being predicted.

  12. Women, Islam, and Pakistan: A Selected Annotated Bibliography. Fulbright-Hays Summer Seminar Abroad Project.

    Science.gov (United States)

    Phillips, Brenda

    This bibliography features selected books, book chapters, research projects, and journal articles, published between 1953 and 1994, about the social, legal, economic, educational political, and professional position of Muslim Pakistani women. Sixteen of the references are annotated. An additional 41 bibliographic references to other materials, not…

  13. 50 CFR 86.61 - What process does the Service use to select projects for grants?

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false What process does the Service use to....61 What process does the Service use to select projects for grants? The Service's Division of Federal... SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION...

  14. Benchmarking of nuclear reactors selected in the frame of GIF project

    International Nuclear Information System (INIS)

    Azpitarte, O; Villanueva, A; Ramos, R; Ramilo, L; Alvarez, M; Yorio, D; Herrero, V

    2012-01-01

    In this article a comparative assessment of the six reactor concepts selected in the frame of the Generation IV International Forum (GIF) project is presented. The assessment was carried out in the areas of Viability of the concept, Design and nuclear safety, Economics, Sustainability, Proliferation resistance, Nuclear fuel, Reprocessing, Materials and Balance of Plant, by means of qualification of chosen performance indicators (author)

  15. Identification and selection of cases and controls in the Pneumonia Etiology Research for Child Health project

    NARCIS (Netherlands)

    Deloria-Knoll, Maria; Feikin, Daniel R.; Scott, J. Anthony G.; O'Brien, Katherine L.; DeLuca, Andrea N.; Driscoll, Amanda J.; Levine, Orin S.; Black, Robert E.; Bhutta, Zulfiqar A.; Campbell, Harry; Cherian, Thomas; Crook, Derrick W.; de Jong, Menno D.; Dowell, Scott F.; Graham, Stephen M.; Klugman, Keith P.; Lanata, Claudio F.; Madhi, Shabir A.; Martin, Paul; Nataro, James P.; Piazza, Franco M.; Qazi, Shamim A.; Zar, Heather J.; Baggett, Henry C.; Brooks, W. Abdullah; Chipeta, James; Ebruke, Bernard; Endtz, Hubert P.; Groome, Michelle; Hammitt, Laura L.; Howie, Stephen R. C.; Kotloff, Karen; Maloney, Susan A.; Moore, David; Otieno, Juliet; Seidenberg, Phil; Tapia, Milagritos; Thamthitiwat, Somsak; Thea, Donald M.; Zaman, Khaleque

    2012-01-01

    Methods for the identification and selection of patients (cases) with severe or very severe pneumonia and controls for the Pneumonia Etiology Research for Child Health (PERCH) project were needed. Issues considered include eligibility criteria and sampling strategies, whether to enroll hospital or

  16. Bug tracking and project management system application in an electronic design company

    Directory of Open Access Journals (Sweden)

    Sadık ARSLAN

    2016-05-01

    Full Text Available In this study, commercially available Bug Tracking and Management Information Systems has been investigated in a comprehensive manner. The systems that commonly used described in detail. Bug Tracking and Project Management Systems requirements analysis of medium-sized companies and Kentkart Ege Electronic which is an Information Technology company has been made. Obtained by the analysis requirements, the appropriate tools are selected for system application. JIRA that a product of Atlassian company was determined as a Bug Tracking and Project Management application tool. In this study, JIRA system adapted to the requirements, Bug Tracking and Project Management systems is designed in a structure which can be easily used by R&D employees. Cost-Benefit analysis is done and using this project was determined to be quite useful.

  17. SE Capstone Project: Building Systems Engineering Education and Workforce Capacity

    Science.gov (United States)

    2012-04-01

    This project developed a system to improve fuel efficiency by means of regenerative braking . The team designed a simple system that allows "bolt-on...air traffic control, social networking, credit/debit cards, and anti-lock brakes are only a few functions enabled by complex systems of systems . We...Building Systems Engineering Education and Workforce Capacity SE Capstone Project APRIL 2012 Report Documentation Page Form ApprovedOMB No. 0704

  18. Identifying inaccuracy of MS Project using system analysis

    Science.gov (United States)

    Fachrurrazi; Husin, Saiful; Malahayati, Nurul; Irzaidi

    2018-05-01

    The problem encountered in project owner’s financial accounting report is the difference in total project costs of MS Project to the Indonesian Standard (Standard Indonesia Standard / Cost Estimating Standard Book of Indonesia). It is one of the MS Project problems concerning to its cost accuracy, so cost data cannot be used in an integrated way for all project components. This study focuses on finding the causes of inaccuracy of the MS Projects. The aim of this study, which is operationally, are: (i) identifying cost analysis procedures for both current methods (SNI) and MS Project; (ii) identifying cost bias in each element of the cost analysis procedure; and (iii) analysing the cost differences (cost bias) in each element to identify what the cause of inaccuracies in MS Project toward SNI is. The method in this study is comparing for both the system analysis of MS Project and SNI. The results are: (i) MS Project system in Work of Resources element has limitation for two decimal digits only, have led to its inaccuracy. Where the Work of Resources (referred to as effort) in MS Project represents multiplication between the Quantities of Activities and Requirements of resources in SNI; (ii) MS Project and SNI have differences in the costing methods (the cost estimation methods), in which the SNI uses the Quantity-Based Costing (QBC), meanwhile MS Project uses the Time-Based Costing (TBC). Based on this research, we recommend to the contractors who use SNI should make an adjustment for Work of Resources in MS Project (with correction index) so that it can be used in an integrated way to the project owner’s financial accounting system. Further research will conduct for improvement the MS Project as an integrated tool toward all part of the project participant.

  19. An ANP-based approach for the selection of photovoltaic solar power plant investment projects

    International Nuclear Information System (INIS)

    Aragones-Beltran, P.; Pastor-Ferrando, J.P.; Rodriguez-Pozo, F.; Chaparro-Gonzalez, F.

    2010-01-01

    In this paper the Analytic Network Process (ANP) is applied to the selection of photovoltaic (PV) solar power projects. These projects follow a long management and execution process from plant site selection to plant start-up. As a consequence, there are many risks of time delays and even of project stoppage. In the case study presented in this paper a top manager of an important Spanish company that operates in the power market has to decide on the best PV project (from four alternative projects) to invest based on risk minimization. The manager identified 50 project execution delay and/or stoppage risks. The influences between the elements of the network (groups of risks and alternatives) were identified and analyzed using the ANP multicriteria decision analysis method. Two different ANP models were used: one hierarchy model (that considers AHP as a particular case of ANP) and one network-based model. The results obtained in each model were compared and analyzed. The main conclusion is that unlike the other models used in the study, the single network model can manage all the information of the real-world problem and thus it is the decision analysis model recommended by the authors. The strengths and weaknesses of ANP as a multicriteria decision analysis tool are also described in the paper. (author)

  20. SADA: Ecological Risk Based Decision Support System for Selective Remediation

    Science.gov (United States)

    Spatial Analysis and Decision Assistance (SADA) is freeware that implements terrestrial ecological risk assessment and yields a selective remediation design using its integral geographical information system, based on ecological and risk assessment inputs. Selective remediation ...

  1. DECISION SUPPORT CONCEPT TO MANAGEMENT OF CONSTRUCTION PROJECTS - PROBLEM OF CONSTRUCTION SITE SELECTION

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2013-02-01

    Full Text Available The aim of this paper is to present Decision Support Concept (DSC for management of construction projects. Focus of our research is in application of multicritera methods (MCM to decision making in planning phase of construction projects (related to the problem of construction sites selection. The problem is identified as a significant one from many different aspects such as economic aspect, civil engineering aspect, etc. what indicates the necessity for evaluation of multiple sites by several different criteria. Therefore, DSC for construction site selection based on PROMETHEE method is designed. In order to define the appropriate criteria, their weights and preference functions for the concept, three groups of stakeholders are involved (investors, construction experts and experts for real estate market in its design. AHP method has been used for determination of criteria weights. The model has been tested on the problem of site selection for construction of residential-commercial building in four largest cities in Croatia.

  2. SELECTING A MANAGEMENT SYSTEM HOSPITAL BY A METHOD MULTICRITERIA

    Directory of Open Access Journals (Sweden)

    Vitorino, Sidney L.

    2016-12-01

    Full Text Available The objective of this report is to assess how the multi-criteria method Analytic Hierarchy Process [HP] can help a hospital complex to choose a more suitable management system, known as Enterprise Resource Planning (ERP. The choice coated is very complex due to the novelty of the process of choosing and conflicts generated between areas that did not have a single view of organizational needs, generating a lot of pressure in the department responsible for implementing systems. To assist in this process, he was hired an expert consultant in decision-making and AHP, which in its role of facilitator, contributed to the criteria for system selection were defined, and the choice to occur within a consensual process. We used the study of a single case, based on two indepth interviews with the consultant and the project manager, and documents generated by the advisory and the tool that supported the method. The results of this analysis showed that the method could effectively collaborate in the system acquisition process, but knowledge of the problems of employees and senior management support, it was not used in new decisions of the organization. We conclude that this method contributed to the consensus in the procurement process, team commitment and engagement of those involved.

  3. Analytical Support for Selecting the Best Investment Project in the Presence of Fuzzy Data

    Directory of Open Access Journals (Sweden)

    Kotsyuba Oleksiy S.

    2017-12-01

    Full Text Available The article is dedicated to the problem of optimal choice in the field of real investments in case of fuzzy estimates of financial and economic parameters. The general methodological basis of the research is an integrated approach to solving decision-making problems under conditions of uncertainty, conflict, and risk generated by them, based on the game theory, proposed by R. I. Trukhayev. In recent decades, it has been actively developed in papers by the followers of the scientific school of riskology under the leadership of V. V. Vitlinsky. One of the system-forming components of the above integration and game methodology is the classifier of information situations (there singled out seven of them. In this case, the description of possible states of the economic environment by a fuzzy set (a subset corresponds to the seventh information situation. An attempt was made to develop a methodical apparatus for the task of selecting the best investment project from a variety of alternative projects in the presence of fuzzy data. As a result, a model based on the use of convolutions of local criteria is formulated. In accordance with the accepted methodological guidelines, the structure of the generalized (integral indicator of the economic attractiveness (efficiency of real investment provides for three hierarchical levels: 1 the level of detailed criteria in terms of partial criteria (financial effect, profitability, payback period, 2 the level of partial criteria, 3 the level presenting the very generalized indicator. In the basic version of the proposed model, among the possible techniques (methods for aggregating indicators detailing the aspects of fuzzy estimates of partial criteria, the preference is given to the method by which they are joined by a combined, additive and multiplicative convolution.

  4. Selection of Investment Projects by Monte Carlo Method in Risk Condition

    Directory of Open Access Journals (Sweden)

    M. E.

    2017-12-01

    Full Text Available The Monte Carlo method (also known as the Monte Carlo simulation was proposed by Nicholas Metropolis, S. Ulam and Jhon Von Neiman in 50-th years of the past century. The method can be widely applied to analysis of investment projects due to the advantages recognized both by practitioners and the academic community. The balance model of a project with discounted financial flows has been implemented for Microsoft Excel and Google Docs spread-sheet solutions. The Monte Carlo method for project with low and high correlated net present value (NPV parameters in the environment of the electronic tables of MS Excel/Google Docs. A distinct graduation of risk was identified. A necessity of account of correlation effects and the use of multivariate imitation during the project selection has been demonstrated.

  5. Methods Dealing with Complexity in Selecting Joint Venture Contractors for Large-Scale Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    Ru Liang

    2018-01-01

    Full Text Available The magnitude of business dynamics has increased rapidly due to increased complexity, uncertainty, and risk of large-scale infrastructure projects. This fact made it increasingly tough to “go alone” into a contractor. As a consequence, joint venture contractors with diverse strengths and weaknesses cooperatively bid for bidding. Understanding project complexity and making decision on the optimal joint venture contractor is challenging. This paper is to study how to select joint venture contractors for undertaking large-scale infrastructure projects based on a multiattribute mathematical model. Two different methods are developed to solve the problem. One is based on ideal points and the other one is based on balanced ideal advantages. Both of the two methods consider individual difference in expert judgment and contractor attributes. A case study of Hong Kong-Zhuhai-Macao-Bridge (HZMB project in China is used to demonstrate how to apply these two methods and their advantages.

  6. A systematic approach to the application of Automation, Robotics, and Machine Intelligence Systems /ARAMIS/ to future space projects

    Science.gov (United States)

    Smith, D. B. S.

    1982-01-01

    The potential applications of Automation, Robotics, and Machine Intelligence Systems (ARAMIS) to space projects are investigated, through a systematic method. In this method selected space projects are broken down into space project tasks, and 69 of these tasks are selected for study. Candidate ARAMIS options are defined for each task. The relative merits of these options are evaluated according to seven indices of performance. Logical sequences of ARAMIS development are also defined. Based on this data, promising applications of ARAMIS are

  7. Project BASIC: Building Art Systems into Curriculum.

    Science.gov (United States)

    Benson, Cal; Doane, Mitzi

    1982-01-01

    Describes Duluth, Minnesota's interdisciplinary program, Project BASIC, which incorporates five major art forms into the elementary curriculum. Schools employ artists-in-residence and in-service training to expand teacher use of arts in the classroom. Results of a research study to measure gains in self-concept and creativity are included. (AM)

  8. Wind power project. Investigation of the habitat use of selected native small game species in the vicinity of wind power systems. Final report; Projekt Windkraftanlagen. Untersuchungen zur Raumnutzung ausgewaehlter heimischer Niederwildarten im Bereich von Windkraftanlagen. Abschlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Pohlmeyer, K.; Menzel, C.

    2001-04-01

    Acting on behalf of the State Hunting Association of Lower Saxony the Game Research Institute (IWFo) of Hannover Veterinary University carried out a three-year study from April 1998 through March 2001 on the habitat use of selected native small game species in the vicinity of aerogenerators. This final report depicts the animals' preferred places, use of agricultural land, avoidance radius, if any, their activities and exposure to predator pressure. The target species were roe deer, hare, red fox, partridge and carrion crow. The study was carried out in Lower Saxony and Bremen on a total study area of 22.3 km{sup 2}, comprising four areas with running aerogenerators and five control areas without an aerogenerator. All parameters were studied in terms of a comparison between aerogenerator and control areas. The objective was to identify differences in population, use of space and habitat and in behaviour. [German] Am Institut fuer Wildtierforschung an der Tieraerztlichen Hochschule Hannover (IWFo) wurde im Auftrag der Landesjaegerschaft Niedersachsen (LJN) in einer dreijaehrigen Studie von April 1998 bis Maerz 2001 die Raumnutzung ausgewaehlter heimischer Niederwildarten im Bereich von Windkraftanlagen (WKA) untersucht. Im Weiteren wurden Aufenthaltspraeferenzen, Nutzung der landwirtschaftlichen Flaechen, moegliche Naeherungslimits und Aktivitaeten der Wildarten sowie der Beutegreiferdruck dargestellt. Zielarten der Studie waren Rehwild, Feldhase, Rotfuchs, Rebhuhn und Rabenkraehen. Die Untersuchungen wurden in vier Gebieten mit in Betrieb befindlichen WKA sowie in fuenf Referenzgebieten ohne WKA in Niedersachsen und Bremen auf einer Flaeche von insgesamt 22,3 km{sup 2} durchgefuehrt. Alle Parameter wurden vergleichend fuer die WKA- und Referenzgebiete betrachtet. Moegliche Unterschiede im Besatz bzw. Bestand, in Raum- und Habitatnutzung sowie im Verhalten wurden herausgearbeitet. (orig.)

  9. A Fast Adaptive Receive Antenna Selection Method in MIMO System

    Directory of Open Access Journals (Sweden)

    Chaowei Wang

    2013-01-01

    Full Text Available Antenna selection has been regarded as an effective method to acquire the diversity benefits of multiple antennas while potentially reduce hardware costs. This paper focuses on receive antenna selection. According to the proportion between the numbers of total receive antennas and selected antennas and the influence of each antenna on system capacity, we propose a fast adaptive antenna selection algorithm for wireless multiple-input multiple-output (MIMO systems. Mathematical analysis and numerical results show that our algorithm significantly reduces the computational complexity and memory requirement and achieves considerable system capacity gain compared with the optimal selection technique in the same time.

  10. Generalized projective synchronization of a unified chaotic system

    International Nuclear Information System (INIS)

    Yan Jianping; Li Changpin

    2005-01-01

    In the present paper, a simple but efficient control technique of the generalized projective synchronization is applied to a unified chaotic system. Numerical simulations show that this method works very well, which can also be applied to other chaotic systems

  11. Sources of project financing in health care systems.

    Science.gov (United States)

    Smith, D G; Wheeler, J R; Rivenson, H L; Reiter, K L

    2000-01-01

    Through discussions with chief financial officers of leading health care systems, insights are offered on preferences for project financing and development efforts. Data from these same systems provide at least anecdotal evidence in support of pecking-order theory.

  12. A secure communication system using projective-lag and/or projective-anticipating synchronizations of coupled multidelay feedback systems

    International Nuclear Information System (INIS)

    Thang Manh Hoang; Nakagawa, Masahiro

    2008-01-01

    In this paper, a chaotic secure communication system is proposed by using the schemes of projective-lag and/or projective-anticipating synchronizations of coupled multidelay feedback systems and the modulation technique of synchronization-manifold shift keying. Further, the security of the proposed system is enhanced by using non-stationary dynamics in the master and/or non-stationary synchronization manifolds. The specific examples using modified Ikeda systems demonstrate and verify the effectiveness of the proposed system

  13. Project management system for the decommissioning of research reactors

    International Nuclear Information System (INIS)

    Park, J. H.

    2006-01-01

    KAERI has developed a computer information system, named DECOMMIS, for the project management with the increased effectiveness of the decommissioning projects and the record keeping for a next decommissioning project. The management system consists of three parts, code management system, data input system (DDIS) and data processing and output system (DDPS). Through the DDIS, the data can be directly inputted at sites and the system can play roles of daily work reports to minimize the time gap between the dismantling activities and the evaluation of the data for project management. The DDPS provides useful information to the staff for more effective project management and this information include several fields, such as project progress management, man power management, waste management, radiation dose of workers and so on. It is expected that the system would enable to maintain the decommissioning data, to prepare the source data for the R and D for development of planning tools and to give information to the staff for the decision on the progress of the projects. In this paper, the overall system will be briefly explained and several examples of the utilization, focused on the waste and manpower control, for the project management will be introduced

  14. An Internet-Based Accounting Information Systems Project

    Science.gov (United States)

    Miller, Louise

    2012-01-01

    This paper describes a student project assignment used in an accounting information systems course. We are now truly immersed in the internet age, and while many required accounting information systems courses and textbooks introduce database design, accounting software development, cloud computing, and internet security, projects involving the…

  15. QFD Application to a Software - Intensive System Development Project

    Science.gov (United States)

    Tran, T. L.

    1996-01-01

    This paper describes the use of Quality Function Deployment (QFD), adapted to requirements engineering for a software-intensive system development project, and sysnthesizes the lessons learned from the application of QFD to the Network Control System (NCS) pre-project of the Deep Space Network.

  16. Preliminary selection criteria for the Yucca Mountain Project waste package container material

    International Nuclear Information System (INIS)

    Halsey, W.G.

    1991-01-01

    The Department of Energy's Yucca Mountain Project (YMP) is evaluating a site at Yucca Mountain in Nevada for construction of a geologic repository for the storage of high-level nuclear waste. Lawrence Livermore National Laboratory's (LLNL) Nuclear Waste Management Project (NWMP) has the responsibility for design, testing, and performance analysis of the waste packages. The design is performed in an iterative manner in three sequential phases (conceptual design, advanced conceptual design, and license application design). An important input to the start of the advanced conceptual design is the selection of the material for the waste containers. The container material is referred to as the 'metal barrier' portion of the waste package, and is the responsibility of the Metal Barrier Selection and Testing task at LLNL. The selection will consist of several steps. First, preliminary, material-independent selection criteria will be established based on the performance goals for the container. Second, a variety of engineering materials will be evaluated against these criteria in a screening process to identify candidate materials. Third, information will be obtained on the performance of the candidate materials, and final selection criteria and quantitative weighting factors will be established based on the waste package design requirements. Finally, the candidate materials will be ranked against these criteria to determine whether they meet the mandated performance requirements, and to provide a comparative score to choose the material for advanced conceptual design activities. This document sets forth the preliminary container material selection criteria to be used in screening candidate materials. 5 refs

  17. RISK MANAGEMENT IN A LARGE-SCALE NEW RAILWAY TRANSPORT SYSTEM PROJECT

    Directory of Open Access Journals (Sweden)

    Sunduck D. SUH, Ph.D., P.E.

    2000-01-01

    Full Text Available Risk management experiences of the Korean Seoul-Pusan high-speed railway (KTX project since the planning stage are evaluated. One can clearly see the interplay of engineering and construction risks, financial risks and political risks in the development of the KTX project, which is the peculiarity of large-scale new railway system projects. A brief description on evaluation methodology and overview of the project is followed by detailed evaluations on key differences in risks between conventional railway system and high-speed railway system, social and political risks, engineering and construction risks, and financial risks. Risks involved in system procurement process, such as proposal solicitation, evaluation, selection, and scope of solicitation are separated out and evaluated in depth. Detailed events resulting from these issues are discussed along with their possible impact on system risk. Lessons learned and further possible refinements are also discussed.

  18. R and D programmes in Germany. Selection and evaluation of projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    In Germany, budgets for research and development rest on three pillars, which are the federal government, the 16 states, and the civil sector. The total expenditure for 1997 amounted to 83.7 times 1 billion Deutsche marks, and this occupied 2.3 of Germany's GNP (gross national product). National research projects constitute the main stream even today. As for federal government-financed projects, they are managed mainly by BMBF (Federal Ministry of Education, Science, Research, and Technology). There are project carriers as the managerial organizations. Requests for proposals for research and development projects are published in official gazettes and technical journals. Such a project has to contain detailed descriptions regarding the setting of targets, levels of technology, cost accounting, development schedule, history of discovery and development involved, etc. Analyses are conducted into technology, economic risk, market, and environmental impact. Support by the German government for government-related projects is given in compliance with predetermined guidelines. The evaluation and selection of submitted proposals are performed by professionals of the project carrier level. In this paper, explanations are also given about contracts, management of progress, and evaluation. (NEDO)

  19. A MCDM approach for project finance selection: An application in the renewable energy sector

    Directory of Open Access Journals (Sweden)

    García-Bernabeu, Ana

    2015-05-01

    Full Text Available Renewable energy (RE is emerging as a solution in order to replace fossil fuels and become the primary source of energy consumption. Investments in the RE sector involve huge amounts of capital but also many risks. Public sector plays an important role in promoting RE projects but due to the need for reducing public expenditure the private sector becomes essential in financing this type of projects. Project Finance is widely used in RE projects and is especially attractive to the private sector because it can fund major projects off balance sheet. The objective of this paper is to present a decision making tool for helping the private sector on the selection process of RE projects to be funded. The problem could be considered as a multiple criteria decision-making problem where both, financial and non-financial criteria have to be taken into account. Objective aggregation weights for those criteria are obtained using the Moderate Pessimism Decision Making approach and a final ranking of the projects is obtained.

  20. Implementation of Computer Assisted Test Selection System in Local Governments

    Directory of Open Access Journals (Sweden)

    Abdul Azis Basri

    2016-05-01

    Full Text Available As an evaluative way of selection of civil servant system in all government areas, Computer Assisted Test selection system was started to apply in 2013. In phase of implementation for first time in all areas in 2014, this system selection had trouble in several areas, such as registration procedure and passing grade. The main objective of this essay was to describe implementation of new selection system for civil servants in the local governments and to seek level of effectiveness of this selection system. This essay used combination of study literature and field survey which data collection was made by interviews, observations, and documentations from various sources, and to analyze the collected data, this essay used reduction, display data and verification for made the conclusion. The result of this essay showed, despite there a few parts that be problem of this system such as in the registration phase but almost all phases of implementation of CAT selection system in local government areas can be said was working clearly likes in preparation, implementation and result processing phase. And also this system was fulfilled two of three criterias of effectiveness for selection system, they were accuracy and trusty. Therefore, this selection system can be said as an effective way to select new civil servant. As suggestion, local governments have to make prime preparation in all phases of test and make a good feedback as evaluation mechanism and together with central government to seek, fix and improve infrastructures as supporting tool and competency of local residents.

  1. On quantifying uncertainty for project selection: the case of renewable energy sources' investment

    International Nuclear Information System (INIS)

    Kirytopoulos, Konstantinos; Rentizelas, Athanassios; Tziralis, Georgios

    2006-01-01

    The selection of a project among different alternatives, considering the limited resources of a company (organisation), is an added value process that determines the prosperity of an undertaken project (investment). This applies also to the 'boming' Renewable Energy Sector, especially under the circumstances established by the recent activation of the Kyoto protocal and by the plethora of available choices for renewable energy sources (RES) projjects. The need for a reliable project selection method among the various alternatives is, therefore, highlighted and, in this context, the paper proposes the NPV function as one of possible criteria for the selection of a RES project. Furthermore, it differentiates from the typical NPV calculation process by adding the concept of a probabilistic NPV approach through Monte Carlo simulation. Reality is non-deterministic, so any attempt of modelling it by using a deterministic approach is by definition erroneous. The paper ultimately proposes a process of substituting the point with a range estimation, capable of quantifying the various uncertainty factors and in this way elucidate the accomplishment possibilities of eligible scenarious. The paper is enhanced by case study showing how the proposed method can be practically applied to support the investment decision, thus enabling the decision makers to judge its effectiveness and usefulness.(Author)

  2. System Design and Engineering, lubricating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    This text book introduces systems engineering for designing systems in multidisciplinary projects. First an overview of the systems engineering process is given. Several systems thinking tracks are presented, to think about the system in a number of ways, its context, its user, its functionality,

  3. High frequency system project implementation plan

    International Nuclear Information System (INIS)

    Moon, L.L.

    1976-01-01

    The High Frequency System is a new mobile, digital diagnostic recording system for use at the Nevada Test Site. Many different kinds of event data will be digitized in real-time by this system, and these data will be recorded and stored for later read-out and transmission to NADCEN. The hardware and software requirements of the High Frequency System are examined, and the parameters of the system are proposed

  4. Development of Earned Value Management System in PP Construction Project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sang-Hyun; Moon, Byeong-Suk [KHNP-CRI, Daejeon (Korea, Republic of)

    2014-10-15

    The NPP construction project has been determined in the form of a rather lump-sum contract with little details in resource requirements and estimations. Therefore, Earned Value Management System (EVMS) needs to be applied to the NPP projects in order to incorporate scope, schedule and cost targeting efficient and to control effective resource. The NPP projects in Korea have not applied EVMS. EVMS has phased in NPP construction project by Korea Hydro and Nuclear Power Co., Ltd (KHNP), playing the role of project master manager in NPP construction in Korea. This study presented the EVMS unlike other system. Accordingly, EVMS is expected to reduce risks and increase efficiency in the NPP project. The NPP construction project is a technology ntensive multi-construction project that should be based on economics and stability and that takes over ten years to complete, requiring investment of billions of dollars, a great number of persons concerned, and a vast store of human and material resources. KHNP is phasing EVMS in NPP construction project for overseas contracts and the efficient management, the paper presented the pilot EVMS in KHNP. It expected to control and identify of NPP construction projects by using EVMS as a computerized management tool which is quantitative and objective management criteria. It is necessary to improve of the contract system related EVM for enterprise system, and the effort will be required, such as on-site support and training so that this can be done in collaboration with the relevant stakeholders.

  5. Optimized application of systems engineering to nuclear waste repository projects

    International Nuclear Information System (INIS)

    Miskimin, P.A.; Shepard, M.

    1986-01-01

    The purpose of this presentation is to describe a fully optimized application of systems engineering methods and philosophy to the management of a large nuclear waste repository project. Knowledge gained from actual experience with the use of the systems approach on two repository projects is incorporated in the material presented. The projects are currently evaluating the isolation performance of different geologic settings and are in different phases of maturity. Systems engineering methods were applied by the principal author at the Waste Isolation Pilot Plant (WIPP) in the form of a functional analysis. At the Basalt Waste Isolation Project (BWIP), the authors assisted the intergrating contractor with the development and application of systems engineering methods. Based on this experience and that acquired from other waste management projects, an optimized plan for applying systems engineering techniques was developed. The plan encompasses the following aspects: project organization, developing and defining requirements, assigning work responsibilities, evaluating system performance, quality assurance, controlling changes, enhancing licensability, optimizing project performance, and addressing regulatory issues. This information is presented in the form of a roadmap for the practical application of system engineering principles to a nuclear waste repository project

  6. FORMATION OF THE CONTENT OF THE PROJECT OF ORGANIZATION OF SECURITY SYSTEMS IN HOTEL BUSINESS

    Directory of Open Access Journals (Sweden)

    Антон Іванович РОГОВИЙ

    2015-05-01

    Full Text Available The article identified and analyzed features of the project management in systems of creating security systems for security systems for the enterprise of hotel business. We have identified the main technical means, which should provide maximum protection of people and infrastructure of hotels. In the article revealed the criteria that should guide the manager in the selection of one or other technical means. In summery we highlighted works, which have to be included in the content of the project of organization of complex security system of companies in the hotel business.

  7. ANG coal gasification project management control system report. [Great Plains project

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    Much time, money and effort has been spent in the forefront of this project for project controls. The work breakdown structure for the systems has been custom designed. The systems, both manual and computerized, have been well scrutinized and chosen by ANG to represent the most cost effective and efficient way of controlling a project the magnitude of $1.5 billion. These systems have been developed in a manner so that information can be gathered as detailed or as summarized as necessary, and in the most timely and expeditious ways.

  8. Selected Examples of LDRD Projects Supporting Test Ban Treaty Verification and Nonproliferation

    Energy Technology Data Exchange (ETDEWEB)

    Jackson, K. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Al-Ayat, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Walter, W. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-02-23

    The Laboratory Directed Research and Development (LDRD) Program at the DOE National Laboratories was established to ensure the scientific and technical vitality of these institutions and to enhance the their ability to respond to evolving missions and anticipate national needs. LDRD allows the Laboratory directors to invest a percentage of their total annual budget in cutting-edge research and development projects within their mission areas. We highlight a selected set of LDRD-funded projects, in chronological order, that have helped provide capabilities, people and infrastructure that contributed greatly to our ability to respond to technical challenges in support of test ban treaty verification and nonproliferation.

  9. Selecting the Most Economic Project under Uncertainty Using Bootstrap Technique and Fuzzy Simulation

    Directory of Open Access Journals (Sweden)

    Kamran Shahanaghi

    2012-01-01

    Full Text Available This article, by leaving pre-determined membership function of a fuzzy set which is a basic assumption for such subject, will try to propose a hybrid technique to select the most economic project among alternative projects in fuzziness interest rates condition. In this way, net present worth (NPW would be the economic indicator. This article tries to challenge the assumption of large sample sizes availability for membership function determination and shows that some other techniques may have less accuracy. To give a robust solution, bootstrapping and fuzzy simulation is suggested and a numerical example is given and analyzed.

  10. Microfluidic systems with ion-selective membranes.

    Science.gov (United States)

    Slouka, Zdenek; Senapati, Satyajyoti; Chang, Hsueh-Chia

    2014-01-01

    When integrated into microfluidic chips, ion-selective nanoporous polymer and solid-state membranes can be used for on-chip pumping, pH actuation, analyte concentration, molecular separation, reactive mixing, and molecular sensing. They offer numerous functionalities and are hence superior to paper-based devices for point-of-care biochips, with only slightly more investment in fabrication and material costs required. In this review, we first discuss the fundamentals of several nonequilibrium ion current phenomena associated with ion-selective membranes, many of them revealed by studies with fabricated single nanochannels/nanopores. We then focus on how the plethora of phenomena has been applied for transport, separation, concentration, and detection of biomolecules on biochips.

  11. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    Science.gov (United States)

    Lawrence N. Hudson; Joseph Wunderle M.; And Others

    2016-01-01

    The PREDICTS project—Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)—has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity of human impacts relating to land use. We have used this evidence base to...

  12. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    NARCIS (Netherlands)

    Hudson, Lawrence N; Newbold, Tim; Contu, Sara; Hill, Samantha L L; Lysenko, Igor; De Palma, Adriana; Phillips, Helen R P; Alhusseini, Tamera I; Bedford, Felicity E; Bennett, Dominic J; Booth, Hollie; Burton, Victoria J; Chng, Charlotte W T; Choimes, Argyrios; Correia, David L P; Day, Julie; Echeverría-Londoño, Susy; Emerson, Susan R; Gao, Di; Garon, Morgan; Harrison, Michelle L K; Ingram, Daniel J; Jung, Martin; Kemp, Victoria; Kirkpatrick, Lucinda; Martin, Callum D; Pan, Yuan; Pask-Hale, Gwilym D; Pynegar, Edwin L; Robinson, Alexandra N; Sanchez-Ortiz, Katia; Senior, Rebecca A; Simmons, Benno I; White, Hannah J; Zhang, Hanbin; Aben, Job; Abrahamczyk, Stefan; Adum, Gilbert B; Aguilar-Barquero, Virginia; Aizen, Marcelo A; Albertos, Belén; Alcala, E L; Del Mar Alguacil, Maria; Alignier, Audrey; Ancrenaz, Marc; Andersen, Alan N; Arbeláez-Cortés, Enrique; Armbrecht, Inge; Arroyo-Rodríguez, Víctor; Aumann, Tom; Axmacher, Jan C; Azhar, Badrul; Azpiroz, Adrián B; Baeten, Lander; Bakayoko, Adama; Báldi, András; Banks, John E; Baral, Sharad K; Barlow, Jos; Barratt, Barbara I P; Barrico, Lurdes; Bartolommei, Paola; Barton, Diane M; Basset, Yves; Batáry, Péter; Bates, Adam J; Baur, Bruno; Bayne, Erin M; Beja, Pedro; Benedick, Suzan; Berg, Åke; Bernard, Henry; Berry, Nicholas J; Bhatt, Dinesh; Bicknell, Jake E; Bihn, Jochen H; Blake, Robin J; Bobo, Kadiri S; Bóçon, Roberto; Boekhout, Teun; Böhning-Gaese, Katrin; Bonham, Kevin J; Borges, Paulo A V; Borges, Sérgio H; Boutin, Céline; Bouyer, Jérémy; Bragagnolo, Cibele; Brandt, Jodi S; Brearley, Francis Q; Brito, Isabel; Bros, Vicenç; Brunet, Jörg; Buczkowski, Grzegorz; Buddle, Christopher M; Bugter, Rob; Buscardo, Erika; Buse, Jörn; Cabra-García, Jimmy; Cáceres, Nilton C; Cagle, Nicolette L; Calviño-Cancela, María; Cameron, Sydney A; Cancello, Eliana M; Caparrós, Rut; Cardoso, Pedro; Carpenter, Dan; Carrijo, Tiago F; Carvalho, Anelena L; Cassano, Camila R; Castro, Helena; Castro-Luna, Alejandro A; Rolando, Cerda B; Cerezo, Alexis; Chapman, Kim Alan; Chauvat, Matthieu; Christensen, Morten; Clarke, Francis M; Cleary, Daniel F R; Colombo, Giorgio; Connop, Stuart P; Craig, Michael D; Cruz-López, Leopoldo; Cunningham, Saul A; D'Aniello, Biagio; D'Cruze, Neil; da Silva, Pedro Giovâni; Dallimer, Martin; Danquah, Emmanuel; Darvill, Ben; Dauber, Jens; Davis, Adrian L V; Dawson, Jeff; de Sassi, Claudio; de Thoisy, Benoit; Deheuvels, Olivier; Dejean, Alain; Devineau, Jean-Louis; Diekötter, Tim; Dolia, Jignasu V; Domínguez, Erwin; Dominguez-Haydar, Yamileth; Dorn, Silvia; Draper, Isabel; Dreber, Niels; Dumont, Bertrand; Dures, Simon G; Dynesius, Mats; Edenius, Lars; Eggleton, Paul; Eigenbrod, Felix; Elek, Zoltán; Entling, Martin H; Esler, Karen J; de Lima, Ricardo F; Faruk, Aisyah; Farwig, Nina; Fayle, Tom M; Felicioli, Antonio; Felton, Annika M; Fensham, Roderick J; Fernandez, Ignacio C; Ferreira, Catarina C; Ficetola, Gentile F; Fiera, Cristina; Filgueiras, Bruno K C; Fırıncıoğlu, Hüseyin K; Flaspohler, David; Floren, Andreas; Fonte, Steven J; Fournier, Anne; Fowler, Robert E; Franzén, Markus; Fraser, Lauchlan H; Fredriksson, Gabriella M; Freire, Geraldo B; Frizzo, Tiago L M; Fukuda, Daisuke; Furlani, Dario; Gaigher, René; Ganzhorn, Jörg U; García, Karla P; Garcia-R, Juan C; Garden, Jenni G; Garilleti, Ricardo; Ge, Bao-Ming; Gendreau-Berthiaume, Benoit; Gerard, Philippa J; Gheler-Costa, Carla; Gilbert, Benjamin; Giordani, Paolo; Giordano, Simonetta; Golodets, Carly; Gomes, Laurens G L; Gould, Rachelle K; Goulson, Dave; Gove, Aaron D; Granjon, Laurent; Grass, Ingo; Gray, Claudia L; Grogan, James; Gu, Weibin; Guardiola, Moisès; Gunawardene, Nihara R; Gutierrez, Alvaro G; Gutiérrez-Lamus, Doris L; Haarmeyer, Daniela H; Hanley, Mick E; Hanson, Thor; Hashim, Nor R; Hassan, Shombe N; Hatfield, Richard G; Hawes, Joseph E; Hayward, Matt W; Hébert, Christian; Helden, Alvin J; Henden, John-André; Henschel, Philipp; Hernández, Lionel; Herrera, James P; Herrmann, Farina; Herzog, Felix; Higuera-Diaz, Diego; Hilje, Branko; Höfer, Hubert; Hoffmann, Anke; Horgan, Finbarr G; Hornung, Elisabeth; Horváth, Roland; Hylander, Kristoffer; Isaacs-Cubides, Paola; Ishida, Hiroaki; Ishitani, Masahiro; Jacobs, Carmen T; Jaramillo, Víctor J; Jauker, Birgit; Hernández, F Jiménez; Johnson, McKenzie F; Jolli, Virat; Jonsell, Mats; Juliani, S Nur; Jung, Thomas S; Kapoor, Vena; Kappes, Heike; Kati, Vassiliki; Katovai, Eric; Kellner, Klaus; Kessler, Michael; Kirby, Kathryn R; Kittle, Andrew M; Knight, Mairi E; Knop, Eva; Kohler, Florian; Koivula, Matti; Kolb, Annette; Kone, Mouhamadou; Kőrösi, Ádám; Krauss, Jochen; Kumar, Ajith; Kumar, Raman; Kurz, David J; Kutt, Alex S; Lachat, Thibault; Lantschner, Victoria; Lara, Francisco; Lasky, Jesse R; Latta, Steven C; Laurance, William F; Lavelle, Patrick; Le Féon, Violette; LeBuhn, Gretchen; Légaré, Jean-Philippe; Lehouck, Valérie; Lencinas, María V; Lentini, Pia E; Letcher, Susan G; Li, Qi; Litchwark, Simon A; Littlewood, Nick A; Liu, Yunhui; Lo-Man-Hung, Nancy; López-Quintero, Carlos A; Louhaichi, Mounir; Lövei, Gabor L; Lucas-Borja, Manuel Esteban; Luja, Victor H; Luskin, Matthew S; MacSwiney G, M Cristina; Maeto, Kaoru; Magura, Tibor; Mallari, Neil Aldrin; Malone, Louise A; Malonza, Patrick K; Malumbres-Olarte, Jagoba; Mandujano, Salvador; Måren, Inger E; Marin-Spiotta, Erika; Marsh, Charles J; Marshall, E J P; Martínez, Eliana; Martínez Pastur, Guillermo; Moreno Mateos, David; Mayfield, Margaret M; Mazimpaka, Vicente; McCarthy, Jennifer L; McCarthy, Kyle P; McFrederick, Quinn S; McNamara, Sean; Medina, Nagore G; Medina, Rafael; Mena, Jose L; Mico, Estefania; Mikusinski, Grzegorz; Milder, Jeffrey C; Miller, James R; Miranda-Esquivel, Daniel R; Moir, Melinda L; Morales, Carolina L; Muchane, Mary N; Muchane, Muchai; Mudri-Stojnic, Sonja; Munira, A Nur; Muoñz-Alonso, Antonio; Munyekenye, B F; Naidoo, Robin; Naithani, A; Nakagawa, Michiko; Nakamura, Akihiro; Nakashima, Yoshihiro; Naoe, Shoji; Nates-Parra, Guiomar; Navarrete Gutierrez, Dario A; Navarro-Iriarte, Luis; Ndang'ang'a, Paul K; Neuschulz, Eike L; Ngai, Jacqueline T; Nicolas, Violaine; Nilsson, Sven G; Noreika, Norbertas; Norfolk, Olivia; Noriega, Jorge Ari; Norton, David A; Nöske, Nicole M; Nowakowski, A Justin; Numa, Catherine; O'Dea, Niall; O'Farrell, Patrick J; Oduro, William; Oertli, Sabine; Ofori-Boateng, Caleb; Oke, Christopher Omamoke; Oostra, Vicencio; Osgathorpe, Lynne M; Otavo, Samuel Eduardo; Page, Navendu V; Paritsis, Juan; Parra-H, Alejandro; Parry, Luke; Pe'er, Guy; Pearman, Peter B; Pelegrin, Nicolás; Pélissier, Raphaël; Peres, Carlos A; Peri, Pablo L; Persson, Anna S; Petanidou, Theodora; Peters, Marcell K; Pethiyagoda, Rohan S; Phalan, Ben; Philips, T Keith; Pillsbury, Finn C; Pincheira-Ulbrich, Jimmy; Pineda, Eduardo; Pino, Joan; Pizarro-Araya, Jaime; Plumptre, A J; Poggio, Santiago L; Politi, Natalia; Pons, Pere; Poveda, Katja; Power, Eileen F; Presley, Steven J; Proença, Vânia; Quaranta, Marino; Quintero, Carolina; Rader, Romina; Ramesh, B R; Ramirez-Pinilla, Martha P; Ranganathan, Jai; Rasmussen, Claus; Redpath-Downing, Nicola A; Reid, J Leighton; Reis, Yana T; Rey Benayas, José M; Rey-Velasco, Juan Carlos; Reynolds, Chevonne; Ribeiro, Danilo Bandini; Richards, Miriam H; Richardson, Barbara A; Richardson, Michael J; Ríos, Rodrigo Macip; Robinson, Richard; Robles, Carolina A; Römbke, Jörg; Romero-Duque, Luz Piedad; Rös, Matthias; Rosselli, Loreta; Rossiter, Stephen J; Roth, Dana S; Roulston, T'ai H; Rousseau, Laurent; Rubio, André V; Ruel, Jean-Claude; Sadler, Jonathan P; Sáfián, Szabolcs; Saldaña-Vázquez, Romeo A; Sam, Katerina; Samnegård, Ulrika; Santana, Joana; Santos, Xavier; Savage, Jade; Schellhorn, Nancy A; Schilthuizen, Menno; Schmiedel, Ute; Schmitt, Christine B; Schon, Nicole L; Schüepp, Christof; Schumann, Katharina; Schweiger, Oliver; Scott, Dawn M; Scott, Kenneth A; Sedlock, Jodi L; Seefeldt, Steven S; Shahabuddin, Ghazala; Shannon, Graeme; Sheil, Douglas; Sheldon, Frederick H; Shochat, Eyal; Siebert, Stefan J; Silva, Fernando A B; Simonetti, Javier A; Slade, Eleanor M; Smith, Jo; Smith-Pardo, Allan H; Sodhi, Navjot S; Somarriba, Eduardo J; Sosa, Ramón A; Soto Quiroga, Grimaldo; St-Laurent, Martin-Hugues; Starzomski, Brian M; Stefanescu, Constanti; Steffan-Dewenter, Ingolf; Stouffer, Philip C; Stout, Jane C; Strauch, Ayron M; Struebig, Matthew J; Su, Zhimin; Suarez-Rubio, Marcela; Sugiura, Shinji; Summerville, Keith S; Sung, Yik-Hei; Sutrisno, Hari; Svenning, Jens-Christian; Teder, Tiit; Threlfall, Caragh G; Tiitsaar, Anu; Todd, Jacqui H; Tonietto, Rebecca K; Torre, Ignasi; Tóthmérész, Béla; Tscharntke, Teja; Turner, Edgar C; Tylianakis, Jason M; Uehara-Prado, Marcio; Urbina-Cardona, Nicolas; Vallan, Denis; Vanbergen, Adam J; Vasconcelos, Heraldo L; Vassilev, Kiril; Verboven, Hans A F; Verdasca, Maria João; Verdú, José R; Vergara, Carlos H; Vergara, Pablo M; Verhulst, Jort; Virgilio, Massimiliano; Vu, Lien Van; Waite, Edward M; Walker, Tony R; Wang, Hua-Feng; Wang, Yanping; Watling, James I; Weller, Britta; Wells, Konstans; Westphal, Catrin; Wiafe, Edward D; Williams, Christopher D; Willig, Michael R; Woinarski, John C Z; Wolf, Jan H D; Wolters, Volkmar; Woodcock, Ben A; Wu, Jihua; Wunderle, Joseph M; Yamaura, Yuichi; Yoshikura, Satoko; Yu, Douglas W; Zaitsev, Andrey S; Zeidler, Juliane; Zou, Fasheng; Collen, Ben; Ewers, Rob M; Mace, Georgina M; Purves, Drew W; Scharlemann, Jörn P W; Purvis, Andy

    The PREDICTS project-Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)-has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity of

  13. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    DEFF Research Database (Denmark)

    Hudson, Lawrence N; Newbold, Tim; Contu, Sara

    2017-01-01

    The PREDICTS project-Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)-has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity ...

  14. Projective synchronization of chaotic systems with bidirectional ...

    Indian Academy of Sciences (India)

    2Department of Applied Mathematics, University of Calcutta, 92, A.P.C. Road,. Kolkata 700 009, India. ∗ ... versal phenomenon in a variety of natural and engineering systems [4]. Over the past two decades ..... Now, following the rule for the construction of master–slave system, we obtain the master system as. ˙x1 = x2 + ...

  15. System supplier approach to projects and operations efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Moe, P O [Siemens Offshore A/S (Norway)

    1994-12-31

    The conference paper outlines the most important elements for a new approach to project realisation that enable a cost reduction of 30-50% compared to conventional methods. The achievements are based on studies and evaluations to the Norwegian Vigdis development project. The system elements covered are the electrical and automation systems including safety and process control and all traditional phases of a project from concept design to the operational phase. The concept involves new principles for project execution where traditional borderlines and interfaces between the various participants have been redefined. Management attention has been verified as an important prerequisite for a successful implementation of this strategy. 2 figs.

  16. The Waste Isolation Pilot Plant (WIPP) integrated project management system

    International Nuclear Information System (INIS)

    Olona, D.; Sala, D.

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP), located 26 miles east of Carlsbad, New Mexico, is a research and development project of the Department of Energy (DOE), tasked with the mission of demonstrating the safe disposal of transuranic (TRU) radioactive wastes. This unique project was authorized by Congress in 1979 in response to the national need for long-term, safe methods for disposing of radioactive by-products from our national defense programs. The WIPP was originally established in December of 1979, by Public Law 96-164, DOE National Security and Military Applications of Nuclear Energy Authorization Act of 1980. Since the inception of the WIPP Project, work has continued to prepare the facility to receive TRU wastes. Studies continue to be conducted to demonstrate the safety of the WIPP facility in accordance with federal and state laws, state agreements, environmental regulations, and DOE Orders. The objectives of implementing an integrated project management system are to assure compliance with all regulatory and federal regulations, identify areas of concern, provide justification for funding, provide a management tool for control of program workscope, and establish a project baseline from which accountability and performance will be assessed. Program management and project controls are essential for the success of the WIPP Project. The WIPP has developed an integrated project management system to establish the process for the control of the program which has an expected total dollar value of $2B over the ten-year period from 1990-2000. The implementation of this project management system was motivated by the regulatory requirements of the project, the highly public environment in which the project takes place, limited funding and resources, and the dynamic nature of the project. Specific areas to be addressed in this paper include strategic planning, project organization, planning and scheduling, fiscal planning, and project monitoring and reporting

  17. Seismic safety margins research program. Phase I final report - Plant/site selection and data collection (Project I)

    International Nuclear Information System (INIS)

    Chuang, T.Y.

    1981-07-01

    Project I of Phase I of the Seismic Safety Margins Research Program (SSMRP) comprised two parts: the selection of a representative nuclear power plant/site for study in Phase I and the collection of data needed by the other SSMRP projects. Unit 1 of the Zion Nuclear Power Plant in Zion, Illinois, was selected for the SSMRP Phase I studies. Unit 1 of the Zion plant has been validated as a good choice for the Phase I study plant. Although no single nuclear power plant can represent all such plants equally well, selection criteria were developed to maximize the generic implications of Phase I of the SSMRP. On the basis of the selection criteria, the Zion plant and its site were found to be reasonably representative of operating and future plants with regard to its nuclear steam supply system; the type of containment structure (prestressed concrete); its electrical capacity (1100 MWe); its location (the Midwest); the peak seismic acceleration used for design (0.17g); and the properties of the underlying soil (the low-strain shear-wave velocity is 1650 ft/s in a 50- to 100-ft-thick layer of soil overlying sedimentary bedrock). (author)

  18. THE SYSTEM OF PROCESSES AND PROJECTS OF THE AIRCRAFT AIRWORTHINESS MAINTENANCE

    Directory of Open Access Journals (Sweden)

    Alexander A. Itskovich

    2018-01-01

    Full Text Available The concept of the aviation enterprise as a unified system of processes and projects of the aircraft airworthiness maintenance (AAM is presented. The relevance of project management tools usage, including the transport branch, is noted; the examples of successful implementation of the development projects at domestic enterprises manufacturing aircraft engines are given. A scheme for the classification of the AAM projects and processes, reflecting their interrelationship, is proposed. The operational activity of the enterprise is a combination of its business processes. The company selects plans and implements the relevant projects for the business processes optimization. At the same time, the projects themselves are the objects of management based on standardized processes. The processes of project management and the main processes of the enterprise are also interrelated and can be objects included in the unified regulations of its units. Increasing the efficiency of operational processes and processes of the aviation enterprise management is the goal of development projects, which are divided into investment projects and organizational changes projects.Limitation of organizational and financial resources of the company requires the identification and systematization of all projects and processes, while the application of project management standards allows to analyze the opportunities and to determine the sequence of their implementation. The importance of accumulating experience of completed projects is shown; the results can become typical methods for planning, organizing the implementation and monitoring of AAM projects. Specific forms of the project management standards implementation for AN-124-100 constructive modification project in LLC Volga-Dnepr Airlines are demonstrated: the control events plan and the project team formation.

  19. I and C systems refurbishment projects for plant life extension

    International Nuclear Information System (INIS)

    Andrashov, A.A.; Sklyar, V.V.; Siora, A.A.

    2012-01-01

    This paper describes the approach to implementation of Nuclear Power Plants (NPPs) Instrumentation and Control (I and C) systems refurbishment projects using Field Programmable Gate Array (FPGA)-based platform. The analysis identifying advantages of refurbishment projects for NPPs is performed. The main goals of the utilities with respect to refurbishment of NPPs I and C systems are outlined. The advantages of FPGA technology application for NPP I and C systems are described. Regulatory framework of FPGA technology for NPPs I and C systems is presented. General principles which may be used for implementation of NPPs I and C system refurbishment projects are presented. The experience of Research and Production Corporation (RPC) Radiy in implementation of NPPs I and C system refurbishment projects is considered. (author)

  20. [Wavelength Selection in Hemolytic Evaluation Systems with Spectrophotometry Detection].

    Science.gov (United States)

    Zhang, Hong; Su, Baochang; Ye, Xunda; Luo, Man

    2016-04-01

    Spectrophotometry is a simple hemolytic evaluation method commonly used in new drugs,biomedical materials and blood products.It is for the quantitative analysis of the characteristic absorption peaks of hemoglobin.Therefore,it is essential to select the correct detection wavelength when the evaluation system has influences on the conformation of hemoglobin.Based on the study of changes in the characteristic peaks over time of the hemolysis supernatant in four systems,namely,cell culture medium,phosphate buffered saline(PBS),physiological saline and banked blood preservation solution,using continuous wavelength scanning,the selections of detection wavelength were proposed as follows.In the cell culture medium system,the wavelength of 415 nm should be selected within 4h;,near 408 nm should be selected within 4~72h.In PBS system,within 4h,541 nm,577nm or 415 nm should be selected;4~72h,541 nm,577nm or near 406 nm should be selected.In physiological saline system,within 4h,414 nm should be selected;4~72h,near 405 nm should be selected;within 12 h,541nm or 577 nm could also be selected.In banked blood preservation solution system,within 72 h,415nm,540 nm or 576 nm should be selected.

  1. Controlled cooling of an electronic system based on projected conditions

    Science.gov (United States)

    David, Milnes P.; Iyengar, Madhusudan K.; Schmidt, Roger R.

    2015-08-18

    Energy efficient control of a cooling system cooling an electronic system is provided based, in part, on projected conditions. The control includes automatically determining an adjusted control setting(s) for an adjustable cooling component(s) of the cooling system. The automatically determining is based, at least in part, on projected power consumed by the electronic system at a future time and projected temperature at the future time of a heat sink to which heat extracted is rejected. The automatically determining operates to reduce power consumption of the cooling system and/or the electronic system while ensuring that at least one targeted temperature associated with the cooling system or the electronic system is within a desired range. The automatically determining may be based, at least in part, on an experimentally obtained model(s) relating the targeted temperature and power consumption of the adjustable cooling component(s) of the cooling system.

  2. Network Insights for Partner Selection in Inter-Organisational New Product Development Projects

    DEFF Research Database (Denmark)

    Ruiz, Pedro Parraguez; Maier, Anja

    2016-01-01

    Selecting partners for new product development (NPD) is an important yet under-supported task. Thispaper focuses on decision-making support for the NPD collaboration stages of partner exploration andsearch. We provide a conceptual framework for a network-based platform to identify potential......: technologicalcloseness, relational closeness, geographical closeness and a set of organisational variables. In order toidentify a subset of new product development partners and aid the selection process, three characteristicsof NPD projects are considered as mediators of those success factors: the desired degree...... and illustrate with examples the networkbasedplatform to explore NPD partners. The developed framework and platform are part of Net-Sights,an ongoing research project to develop open-source decision-support tools for network insights. Thefirst version of this tool will soon be available as an online platform...

  3. Lab-Scale CO2 Capture Studies and Selection of most Promising Sorbent. CAPHIGAS Project Tasks Report. Years 2010-2011

    International Nuclear Information System (INIS)

    Marano, M.; Torreiro, Y.

    2012-01-01

    In this report the main activities carried out within the CAPHIGAS Project, ref. ENE2009-08002 financed by the Spanish Ministry of Science and Innovation for the first two years are reported. The aim of the project is the development of a hybrid system WGS-adsorbent-membrane for the separation of CO 2 with H 2 production and this report summarises the most relevant results obtained on tasks L-1 and L-2 which refer to the selection, characterisation and study at laboratory scale of different sorbent materials to select those more promising for the hybrid system proposed. (Author) 55 refs.

  4. Method for Business Process Management System Selection

    NARCIS (Netherlands)

    Thijs van de Westelaken; Bas Terwee; Pascal Ravesteijn

    2013-01-01

    In recent years business process management (BPM) and specifically information systems that support the analysis, design and execution of processes (also called business process management systems (BPMS)) are getting more attention. This has lead to an increase in research on BPM and BPMS. However

  5. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  6. On the use of polar coordinate system in the projective graphic drawings

    Directory of Open Access Journals (Sweden)

    Ivashchenko Andrey Viktorovich

    2016-11-01

    Full Text Available Projective graphics is a polyhedra simulation method, which is based on the use of trace diagrams of initial polyhedron. Previously developed computer software allows using Cartesian coordinates. In some cases it is advisable to use polar coordinate system for description of projective graphics drawings. Using the example of icosahedron the authors analyzed the advantages of using projective graphics drawings in the polar coordinate system. The transition to the polar coordinate system is a tool that allows using certain patterns of projective graphics drawings in the process of calculation. When using polar coordinate system the search of Polar correspondence for the directs is simplified. In order to analyze the two lines in the polar coordinate system it is enough to compare the corresponding coefficients of the equations of these lines. The authors consider a diagram of the icosahedron in polar coordinates, and a corresponding fragment of calculation program in the Mathematica system. Some examples of forming based on icosahedrons are offered. Optimization of computer programs using polar coordinate system will simplifies the calculations of projective graphics drawings, accelerates the process of constructing three-dimensional models, which expand the possibilities of selecting original solutions. Finally, the authors conclude that it is appropriate to use the polar coordinate system only in the construction of projective graphics diagrams of the planes system having rich symmetry. All Platonic and Archimedean solids, Catalan solid possess this property.

  7. NASA UAS Integration into the NAS Project: Human Systems Integration

    Science.gov (United States)

    Shively, Jay

    2016-01-01

    This presentation provides an overview of the work the Human Systems Integration (HSI) sub-project has done on detect and avoid (DAA) displays while working on the UAS (Unmanned Aircraft System) Integration into the NAS project. The most recent simulation on DAA interoperability with Traffic Collision Avoidance System (TCAS) is discussed in the most detail. The relationship of the work to the larger UAS community and next steps are also detailed.

  8. Research and Development Project Selection Methods at the Air Force Wright Aeronautical Laboratories.

    Science.gov (United States)

    1985-09-01

    personal and telephone interviews. Ten individuals from each of the four AFWAL Laboratories were interrviewed. The results illustrated that few of the...680). Aaker and Tyebee. 1978. The authors constructed a model that dealt with the selection of interdependent R&D projects. The model covers three...of this research effort. Scope * The data collection method used in this study consisted of a combination of personal and telephone interviews. The

  9. Controlling general projective synchronization of fractional order Rossler systems

    International Nuclear Information System (INIS)

    Shao Shiquan

    2009-01-01

    This paper proposed a method to achieve general projective synchronization of two fractional order Rossler systems. First, we construct the fractional order Rossler system's corresponding approximation integer order system. Then, a control method based on a partially linear decomposition and negative feedback of state errors was utilized on the integer order system. Numerical simulations show the effectiveness of the proposed method.

  10. Select PC/windows flat to develop data acquisition system

    International Nuclear Information System (INIS)

    Zhang Jin

    1993-01-01

    Through needing analysis, and also, considering user's ability of payment, the characteristic of China computer market, the computer developing tending, and the system's compatibility and up grade capability, PC/Windows flat are selected to develop a data acquisition system

  11. Selection of nuclear power information database management system

    International Nuclear Information System (INIS)

    Zhang Shuxin; Wu Jianlei

    1996-01-01

    In the condition of the present database technology, in order to build the Chinese nuclear power information database (NPIDB) in the nuclear industry system efficiently at a high starting point, an important task is to select a proper database management system (DBMS), which is the hinge of the matter to build the database successfully. Therefore, this article explains how to build a practical information database about nuclear power, the functions of different database management systems, the reason of selecting relation database management system (RDBMS), the principles of selecting RDBMS, the recommendation of ORACLE management system as the software to build database and so on

  12. Planar dynamical systems selected classical problems

    CERN Document Server

    Liu, Yirong; Huang, Wentao

    2014-01-01

    This book presents in an elementary way the recent significant developments in the qualitative theory of planar dynamical systems. The subjects are covered as follows: the studies of center and isochronous center problems, multiple Hopf bifurcations and local and global bifurcations of the equivariant planar vector fields which concern with Hilbert's 16th problem. This book is intended for graduate students, post-doctors and researchers in the area of theories and applications of dynamical systems. For all engineers who are interested the theory of dynamical systems, it is also a reasona

  13. DOE Heat Pump Centered Integrated Community Energy Systems Project

    Energy Technology Data Exchange (ETDEWEB)

    Calm, J. M.

    1979-01-01

    The Heat Pump Centered Integrated Community Energy Systems (HP-ICES) Project is a multiphase undertaking seeking to demonstrate one or more operational HP-ICES by the end of 1983. The seven phases include System Development, Demonstration Design, Design Completion, HP-ICES Construction, Operation and Data Acquisition, HP-ICES Evaluation, and Upgraded Continuation. This project is sponsored by the Community Systems Branch, Office of Buildings and Community Systems, Assistant Secretary for Conservation and Solar Applicaions, U.S. Department of Energy (DOE). It is part of the Community Systems Program and is managed by the Energy and Environmental Systems Division of Argonne Natinal Laboratory.

  14. Multiuser hybrid switched-selection diversity systems

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein M.; Alouini, Mohamed-Slim

    2011-01-01

    system provides flexibility in trading-off the channel information feedback overhead with the prospected multiuser diversity gains. The users are clustered into groups, and the users' groups are ordered into a sequence. Per-group feedback thresholds

  15. ATTENTIONAL NETWORKS AND SELECTIVE VISUAL SYSTEM

    Directory of Open Access Journals (Sweden)

    ALEJANDRO CASTILLO MORENO

    2006-05-01

    Full Text Available In this paper we checked the principal researches and theories to explain the attention system functioning.We are going to start reviewing along time about the concept of attention, from filter theories andresources distributor theories, to the current theories in which attention is conceived as a control system.From this last point of view, we will emphasize on the attentional networks theory of Posner, thatproposes different systems to explain diverse aspects of attention, but they are related to each other. Atlast in this paper, we will mention experimental results that have been important to characterize theselective attentional mechanisms of the human visual system, using the attentional spotlight model forthis aim.

  16. Computerized adaptive testing item selection in computerized adaptive learning systems

    NARCIS (Netherlands)

    Eggen, Theodorus Johannes Hendrikus Maria; Eggen, T.J.H.M.; Veldkamp, B.P.

    2012-01-01

    Item selection methods traditionally developed for computerized adaptive testing (CAT) are explored for their usefulness in item-based computerized adaptive learning (CAL) systems. While in CAT Fisher information-based selection is optimal, for recovering learning populations in CAL systems item

  17. The system of employees motivation in a selected company

    OpenAIRE

    BEEROVÁ, Petra

    2014-01-01

    The system of employees motivation in a selected company is the title of this thesis that closely analyzes the system of employees motivation in a selected company and outlines some suggestions that could improve the management and performance in this area. Moreover, the focus is placed towards the motivation of employees in the workplace.

  18. Integrated project management information systems: the French nuclear industry experience

    International Nuclear Information System (INIS)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-01-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK)

  19. Integrated project management information systems: the French nuclear industry experience

    Energy Technology Data Exchange (ETDEWEB)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-03-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK).

  20. Development of a Selectable Output Ultraviolet Laser System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Laser ablation methods of chemical analysis, such as those employed by the Mars Organic Molecule Analyzer (MOMA, on the ExoMars 2018 rover) and the time-of-flight...

  1. CMS Proposal for the Engineering Data Management System (EDMS) Pilot Project with Matrix & Report

    CERN Document Server

    Kuipers, Jos

    1997-01-01

    The CMS Working Group for Engineering and Integration ( WOGEI) has been involved in the Engineering Data Management System ( EDMS) Task Force. This Task Force has started in 1995 with definition and selection procedure for an EDMS. The aim is to find out whether an EDMS is useful for CERN and the LHC experiments and which product is most suited. The CMS-WOGEI has proposed and carried out a pilot project with Matrix, the EDMS selected by the EDMS task force. In this technical note the pilot project is described and the experience gained with this is summarised.

  2. Adaptive Equalizer Using Selective Partial Update Algorithm and Selective Regressor Affine Projection Algorithm over Shallow Water Acoustic Channels

    Directory of Open Access Journals (Sweden)

    Masoumeh Soflaei

    2014-01-01

    Full Text Available One of the most important problems of reliable communications in shallow water channels is intersymbol interference (ISI which is due to scattering from surface and reflecting from bottom. Using adaptive equalizers in receiver is one of the best suggested ways for overcoming this problem. In this paper, we apply the family of selective regressor affine projection algorithms (SR-APA and the family of selective partial update APA (SPU-APA which have low computational complexity that is one of the important factors that influences adaptive equalizer performance. We apply experimental data from Strait of Hormuz for examining the efficiency of the proposed methods over shallow water channel. We observe that the values of the steady-state mean square error (MSE of SR-APA and SPU-APA decrease by 5.8 (dB and 5.5 (dB, respectively, in comparison with least mean square (LMS algorithm. Also the families of SPU-APA and SR-APA have better convergence speed than LMS type algorithm.

  3. Intelligent Materials Tracking System for Construction Projects Management

    Directory of Open Access Journals (Sweden)

    Narimah Kasim

    2015-05-01

    Full Text Available An essential factor adversely affecting the performance of construction projects is the improper handling of materials during site activities. In addition, paper-based reports are mostly used to record and exchange information related to the material components within the supply chain, which is problematic and inefficient. Generally, technologies (such as wireless systems and RFID are not being adequately used to overcome human errors and are not well integrated with project management systems to make tracking and management of materials easier and faster. Findings from a literature review and surveys showed that there is a lack of positive examples of such tools having been used effectively. Therefore, this research focused on the development of a materials tracking system that integrates RFID-based materials management with resources modelling to improve on-site materials tracking. Rapid prototyping was used to develop the system and testing of the system was carried out to examine the functionality and working appropriately. The proposed system is intended to promote the employment of RFID for automatic materials tracking with integration of resource modelling (Microsoft (R Office Project in the project management system in order to establish which of the tagged components are required resources for certain project tasks. In conclusion, the system provides an automatic and easy tracking method for managing materials during materials delivery and inventory management processes in construction projects.

  4. Data Management System of the DIRAC Project

    CERN Multimedia

    Haen, Christophe; Tsaregorodtsev, Andrei

    2015-01-01

    The DIRAC Interware provides a development framework and a complete set of components for building distributed computing systems. The DIRAC Data Management System (DMS) offers all the necessary tools to ensure data handling operations for small and large user communities. It supports transparent access to storage resources based on multiple technologies, and is easily expandable. The information on data files and replicas is kept in a File Catalog of which DIRAC offers a powerful and versatile implementation (DFC). Data movement can be performed using third party services including FTS3. Bulk data operations are resilient with respect to failures due to the use of the Request Management System (RMS) that keeps track of ongoing tasks. In this contribution we will present an overview of the DIRAC DMS capabilities and its connection with other DIRAC subsystems such as the Transformation System. The DIRAC DMS is in use by several user communities now. The contribution will present the experience of the LHCb exper...

  5. Projective and hybrid projective synchronization for the Lorenz-Stenflo system with estimation of unknown parameters

    International Nuclear Information System (INIS)

    Mukherjee, Payel; Banerjee, Santo

    2010-01-01

    In this work, in the first phase, we study the phenomenon of projective synchronization in the Lorenz-Stenflo system. Synchronization is then investigated for the same system with unknown parameters. We show analytically that synchronization is possible for some proper choice of the nonlinear controller by using a suitable Lyapunov function. With the help of this result, it is also possible to estimate the values of the unknown system parameters. In the second phase as an extension of our analysis, we investigate the new hybrid projective synchronization for the same system. All our analyses are well supported with numerical evidence.

  6. SGDes project. Decommissioning management system of Enresa

    International Nuclear Information System (INIS)

    Fernandez Lopez, M.; Julian, A. de

    2013-01-01

    ENRESA, the public company responsible for managing radioactive waste produced in spain and nuclear facilities decommissioning work, has developed a management information system (SGDes) for the decommissioning of nuclear power plants, critical for the company. SGDes system is capable of responding to operational needs for efficient, controlled and secure way. Dismantling activities require a rigorous operations control within highly specialized, process systematization and safety framework, both the human and technological point of view. (Author)

  7. Evaluating and projecting the European security system

    International Nuclear Information System (INIS)

    Dean, J.

    1991-01-01

    Components of the new European security system are described taking into account the new policy making and possibilities to resolve conflicts. Programmes for political and economic integration and co-operation managed by the European Community will provide main positive content of the new European security system. An insight of the future of nuclear armaments in Europe is included together with confidence building measure and the role of NATO

  8. Advanced Ground Systems Maintenance Physics Models For Diagnostics Project

    Science.gov (United States)

    Perotti, Jose M.

    2015-01-01

    The project will use high-fidelity physics models and simulations to simulate real-time operations of cryogenic and systems and calculate the status/health of the systems. The project enables the delivery of system health advisories to ground system operators. The capability will also be used to conduct planning and analysis of cryogenic system operations. This project will develop and implement high-fidelity physics-based modeling techniques tosimulate the real-time operation of cryogenics and other fluids systems and, when compared to thereal-time operation of the actual systems, provide assessment of their state. Physics-modelcalculated measurements (called “pseudo-sensors”) will be compared to the system real-timedata. Comparison results will be utilized to provide systems operators with enhanced monitoring ofsystems' health and status, identify off-nominal trends and diagnose system/component failures.This capability can also be used to conduct planning and analysis of cryogenics and other fluidsystems designs. This capability will be interfaced with the ground operations command andcontrol system as a part of the Advanced Ground Systems Maintenance (AGSM) project to helpassure system availability and mission success. The initial capability will be developed for theLiquid Oxygen (LO2) ground loading systems.

  9. Full state hybrid projective synchronization in hyperchaotic systems

    International Nuclear Information System (INIS)

    Chu Yandong; Chang Yingxiang; Zhang Jiangang; Li Xianfeng; An Xinlei

    2009-01-01

    In this letter, we investigate the full state hybrid projective synchronization (FSHPS) which includes complete synchronization, anti-synchronization and projective synchronization as its special items. Based on Lyapunov stability theory a controller can be designed for achieving the FSHPS of hyperchaotic systems. Numerical simulations are provided to verify the effectiveness of the proposed scheme.

  10. Boundary Spanning in Offshored Information Systems Development Projects

    Science.gov (United States)

    Krishnan, Poornima

    2010-01-01

    Recent growth in offshore outsourcing of information systems (IS) services is accompanied by managing the offshore projects successfully. Much of the project failures can be attributed to geographic and organizational boundaries which create differences in culture, language, work patterns, and decision making processes among the offshore project…

  11. The Food Early Warning System Project in Somalia

    Directory of Open Access Journals (Sweden)

    Leblanc, M.

    1992-01-01

    Full Text Available The article describes shortly the objectives of a Food Early Warning System (FEWS project, as well as its organisation. The specifie case of Somalia, where the project had to evolve in increasingly difficult situations, and the solutions used so as to preserve the output, are described.

  12. A Role for Soft Systems Methodology in ELT Projects.

    Science.gov (United States)

    Holliday, Adrian

    1990-01-01

    Discusses the uses for soft systems methodology (SSM) in English language training (ELT) projects. It is suggested that ethnographic techniques may help in achieving the understanding needed to start an ELT project while SSM may provide a useful means for structuring ethnographic findings. (Author/VWL)

  13. Automated transportation management system (ATMS) software project management plan (SPMP)

    Energy Technology Data Exchange (ETDEWEB)

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  14. Selected methods of rehabilitation in systemic sclerosis

    Directory of Open Access Journals (Sweden)

    Agnieszka Gerkowicz

    2017-09-01

    Full Text Available Systemic sclerosis is a chronic connective tissue disease characterized by microvascular abnormalities, immune disturbances and progressive fibrosis of the skin and internal organs. Skin involvement may result in contractures, leading to marked loss of hand mobility, adversely affecting the performance of daily activities and decreasing the quality of life. Face involvement not only causes functional loss, but also lowers the self-esteem of patients. Increasing attention has recently been focused on the need to rehabilitate patients with systemic sclerosis in order to prevent the development of joint contractures and loss of mobility. The study presents a review of the current literature on rehabilitation possibilities in patients with systemic sclerosis, with a special focus on physiotherapy methods.

  15. NPP site selection: A systems engineering approach

    Energy Technology Data Exchange (ETDEWEB)

    Pwani, Henry; Kamanja, Florah; Zolkaffly, Zulfakar; Jung, J. C. [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2012-10-15

    The necessity for improved decision making concerning the siting and licensing of major power facilities has been accelerated in the past decade by the increased environmental consciousness of the public and by the energy crisis. These problems are exceedingly complex due to their multiple objective nature, the many interest groups, the long range time horizons, and the inherent uncertainties of the potential impacts of any decision. Along with the relatively objective economic and engineering concerns, the more subjective factors involving safety, environmental, and social issues are crucial to the problem. The preferences of the general public, as consumers, the utility companies, as builders and operators of power plant facilities, and environmentalists and the government must be accounted for in analyzing power plant siting and licensing issues. We advocate for a systems engineering approach that articulates stake holder's requirements, expert judgements, and a systems decision making approach. The appropriateness and application of systems decision making process is illustrated in this paper.

  16. NPP site selection: A systems engineering approach

    International Nuclear Information System (INIS)

    Pwani, Henry; Kamanja, Florah; Zolkaffly, Zulfakar; Jung, J. C.

    2012-01-01

    The necessity for improved decision making concerning the siting and licensing of major power facilities has been accelerated in the past decade by the increased environmental consciousness of the public and by the energy crisis. These problems are exceedingly complex due to their multiple objective nature, the many interest groups, the long range time horizons, and the inherent uncertainties of the potential impacts of any decision. Along with the relatively objective economic and engineering concerns, the more subjective factors involving safety, environmental, and social issues are crucial to the problem. The preferences of the general public, as consumers, the utility companies, as builders and operators of power plant facilities, and environmentalists and the government must be accounted for in analyzing power plant siting and licensing issues. We advocate for a systems engineering approach that articulates stake holder's requirements, expert judgements, and a systems decision making approach. The appropriateness and application of systems decision making process is illustrated in this paper

  17. Identification of multi-criteria for supplier selection in IT project outsourcing

    Science.gov (United States)

    Fusiripong, Prashaya; Baharom, Fauziah; Yusof, Yuhanis

    2017-10-01

    In the increasing global business competitiveness, most organizations have attempted to determine the suitable external parties to support their core and non-core competency, particularly, in IT project outsourcing. The IT supplier selection is required to apply multi-criteria which comprised tangible criteria and intangible criteria in consider optimal IT supplier. Most researches attempted to identify optimal criteria for selecting IT supplier, however, the criteria cannot be the considered common criteria support the variety of IT outsourcing. Therefore, the study aimed to identify a common set of criteria being used in the various types of IT outsourcing. The common criteria are constructed by multi-criteria and success criteria, which were collected by literature review with comprehensive and comparative approach. Consequently, the researchers are able to identify a common set of criteria adopted in the variety of selection problem IT outsourcing supplier.

  18. 41 CFR 102-74.135 - Who selects construction and alteration projects that are to be performed?

    Science.gov (United States)

    2010-07-01

    ... and alteration projects that are to be performed? 102-74.135 Section 102-74.135 Public Contracts and... construction and alteration projects that are to be performed? The Administrator of General Services selects construction and alteration projects to be performed. ...

  19. Optimalization of selected RFID systems Parameters

    Directory of Open Access Journals (Sweden)

    Peter Vestenicky

    2004-01-01

    Full Text Available This paper describes procedure for maximization of RFID transponder read range. This is done by optimalization of magnetics field intensity at transponder place and by optimalization of antenna and transponder coils coupling factor. Results of this paper can be used for RFID with inductive loop, i.e. system working in near electromagnetic field.

  20. Control system of the MACSE project

    International Nuclear Information System (INIS)

    Gournay, J.F.; Gougnaud, F.; Matichard, G.; Azoulay, R.; Bouillac, A.

    1991-01-01

    With the goal of investigating all the technological aspects of superconducting RF acceleration, the so-called MACSE facility was put in operation at the end of 1990. The control system is built with several VME crates linked together with a dedicated Ethernet network. VxWorks is the real-time operating system used. A set of software services was built on top of VxWorks (high level communication tools, a data-base management system, a library of VME boards drivers and a limited man-machine interface). A complete range of application programs have been developed with these tools in order to fulfill the requirements of such a facility (settings of the parameters, surveillance, archive facility, closed loops...). The TCP-IP protocols family is extensively used for communications between the components of the system (UDP, RPC, rcmd, NFS). The development environment is based on the host-target approach through the use of a network of Sun 3/80 workstations. After 1 1/2 year of experience, this system has proven to be powerful and flexible [fr

  1. Metaphors in Managerial and Employee Sensemaking in an Information Systems Project

    DEFF Research Database (Denmark)

    Hekkala, Riitta; Stein, Mari-Klara; Rossi, Matti

    2018-01-01

    This longitudinal study looks at the metaphors used in a public sector information systems development project from the perspective of cognitive metaphor theory (Lakoff & Johnson,). We examine the use of metaphors by project team members, including representatives of the users, software developers......-intensive situations, metaphor use with unclear intentions and purpose hinders learning and creates more chaos than order. From a practical perspective, our study highlights the relevance of metaphor use for project management. We suggest that intentional selection of metaphors by management could be beneficial...

  2. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    International Nuclear Information System (INIS)

    Baide, D.G.; Webster, T.L.

    1995-12-01

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list

  3. The Fox Project: Advanced Development of Systems Software

    National Research Council Canada - National Science Library

    1999-01-01

    The long-term objectives of the Carnegie Mellon Fox Project are to improve the design and construction of systems software and to further the development of advanced programming language technology...

  4. The Fox Project: Advanced Development of Systems Software

    National Research Council Canada - National Science Library

    2000-01-01

    The long-term objectives of the Carnegie Mellon Fox Project are to improve the design and construction of systems software and to further the development of advanced programming language technology...

  5. Project W-420 Stack Monitoring system upgrades conceptual design report

    International Nuclear Information System (INIS)

    TUCK, J.A.

    1998-01-01

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks

  6. Using electronic document management systems to manage highway project files.

    Science.gov (United States)

    2011-12-12

    "WisDOTs Bureau of Technical Services is interested in learning about the practices of other state departments of : transportation in developing and implementing an electronic document management system to manage highway : project files"

  7. Project W-420 Stack Monitoring system upgrades conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    TUCK, J.A.

    1998-11-06

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks.

  8. Project W-058 monitor and control system logic

    International Nuclear Information System (INIS)

    ROBERTS, J.B.

    1999-01-01

    This supporting document contains the printout of the control logic for the Project W-058 Monitor and Control System, as developed by Programmable Control Services, Inc. The logic is arranged in five appendices, one for each programmable logic controller console

  9. Selection of Fuel System for Modern Heavy Duty Diesel Engines

    Directory of Open Access Journals (Sweden)

    G. M. Kukharonok

    2004-01-01

    Full Text Available Fuel systems of diesel engines have been analyzed. The paper shows components of the systems, peculiarities of their manufacturing process. Difference in efficiency of the systems, their application and market prospects are considered in the paper. While solving problems to design a power installation the essence of fuel system selection is given on the basis of an internal combustion engine.

  10. A Consistent Fuzzy Preference Relations Based ANP Model for R&D Project Selection

    Directory of Open Access Journals (Sweden)

    Chia-Hua Cheng

    2017-08-01

    Full Text Available In today’s rapidly changing economy, technology companies have to make decisions on research and development (R&D projects investment on a routine bases with such decisions having a direct impact on that company’s profitability, sustainability and future growth. Companies seeking profitable opportunities for investment and project selection must consider many factors such as resource limitations and differences in assessment, with consideration of both qualitative and quantitative criteria. Often, differences in perception by the various stakeholders hinder the attainment of a consensus of opinion and coordination efforts. Thus, in this study, a hybrid model is developed for the consideration of the complex criteria taking into account the different opinions of the various stakeholders who often come from different departments within the company and have different opinions about which direction to take. The decision-making trial and evaluation laboratory (DEMATEL approach is used to convert the cause and effect relations representing the criteria into a visual network structure. A consistent fuzzy preference relations based analytic network process (CFPR-ANP method is developed to calculate the preference-weights of the criteria based on the derived network structure. The CFPR-ANP is an improvement over the original analytic network process (ANP method in that it reduces the problem of inconsistency as well as the number of pairwise comparisons. The combined complex proportional assessment (COPRAS-G method is applied with fuzzy grey relations to resolve conflicts arising from differences in information and opinions provided by the different stakeholders about the selection of the most suitable R&D projects. This novel combination approach is then used to assist an international brand-name company to prioritize projects and make project decisions that will maximize returns and ensure sustainability for the company.

  11. Redefining Project Management Information Systems with New IT Services

    Directory of Open Access Journals (Sweden)

    Luminita Hurbean

    2013-04-01

    Full Text Available Achieving successful adoption of an innovative project management information system should involve influencing the project management environment by providing useful tools, training, reusable templates, techniques, and methods that improve the project manager's ability to successfully execute. This paper suggests that project management practice, enabled by emerging IT, could more explicitly recognize, represent, and manage the interdependencies that are pervasive throughout projects, thereby fully exploiting the potential of the IT to improve overall project performance. The last few years IT&C evolution led to new approaches to application and infrastructure architecture. Breaking from the traditional procedures used by organizations, they propose a cloud operating platform that reduces complexity and improves agility and scalability by altering the approach to the way data centres are built, applications are developed, infrastructure is managed, and organizations align and collaborate. Further, the paper explores the growing impact of mobile computing, cloud delivery and social business collaboration project management information systems and proposes a shift of a Five C’s for information systems in a cloud based operating platform, driven by cooperation, teamwork and continuous improvement.The proposed shift in the cloud indicates actual tools that may be adopted for better collaboration and higher business value of the project information management.

  12. Function Projective Synchronization of Two Identical New Hyperchaotic Systems

    International Nuclear Information System (INIS)

    Li Xin; Chen Yong

    2007-01-01

    A function projective synchronization of two identical hyperchaotic systems is defined and the theorem of sufficient condition is given. Based on the active control method and symbolic computation Maple, the scheme of function projective synchronization is developed to synchronize the two identical new hyperchaotic systems constructed by Yan up to a scaling function matrix with different initial values. Numerical simulations are used to verify the effectiveness of the scheme.

  13. Systems design and engineering : facilitating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    2016-01-01

    As its name implies, the aim of Systems Design and Engineering: Facilitating Multidisciplinary Development Projects is to help systems engineers develop the skills and thought processes needed to successfully develop and implement engineered systems. Such expertise typically does not come through

  14. Tank waste remediation system characterization project quality policies

    International Nuclear Information System (INIS)

    Board, D.C.

    1997-01-01

    This quality plan describes the system used by Characterization Project management to achieve quality. This plan is comprised of eleven quality policies which, when taken together, form a management system deployed to achieve quality. This quality management system is based on the customer's quality requirements known as the 'RULE', 10 CFR 830.120, Quality Assurance

  15. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-420. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance. This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  16. Major Components of the National TRU Waste System Optimization Project

    International Nuclear Information System (INIS)

    Moody, D.C.; Bennington, B.; Sharif, F.

    2002-01-01

    The National Transuranic (TRU) Program (NTP) is being optimized to allow for disposing of the legacy TRU waste at least 10 years earlier than originally planned. This acceleration will save the nation an estimated $713. The Department of Energy's (DOE'S) Carlsbad Field Office (CBFO) has initiated the National TRU Waste System Optimization Project to propose, and upon approvaI, implement activities that produce significant cost saving by improving efficiency, thereby accelerating the rate of TRU waste disposal without compromising safety. In its role as NTP agent of change, the National TRU Waste System Optimization Project (the Project) (1) interacts closely with all NTP activities. Three of the major components of the Project are the Central Characterization Project (CCP), the Central Confirmation Facility (CCF), and the MobiIe/Modular Deployment Program.

  17. Extending the GANIL control system for the SPIRAL project

    International Nuclear Information System (INIS)

    Lecorche, E.

    1997-01-01

    The SPIRAL project under construction at GANIL aims to deliver radioactive ion beams to the physicists by the end of 1998. In 1996, it has been proposed to achieve most of the SPIRAL control system as an extension of the system currently in use at GANIL. Therefore the main features of the GANIL control system design are first recalled. Then the paper shows how the GANIL control system should have been upgraded and extended to integrate the SPIRAL project. This evolution had to cope with the specific needs brought by the new machine and to consider the size of the project which is around one third of the GANIL control system volume. Lastly current status of the system is given. (author)

  18. Extending the GANIL control system for the SPIRAL project

    Energy Technology Data Exchange (ETDEWEB)

    Lecorche, E

    1997-12-31

    The SPIRAL project under construction at GANIL aims to deliver radioactive ion beams to the physicists by the end of 1998. In 1996, it has been proposed to achieve most of the SPIRAL control system as an extension of the system currently in use at GANIL. Therefore the main features of the GANIL control system design are first recalled. Then the paper shows how the GANIL control system should have been upgraded and extended to integrate the SPIRAL project. This evolution had to cope with the specific needs brought by the new machine and to consider the size of the project which is around one third of the GANIL control system volume. Lastly current status of the system is given. (author) 5 refs.

  19. Low resolution spectroscopy of selected Algol systems

    Science.gov (United States)

    Devarapalli, Shanti Priya; Jagirdar, Rukmini; Parthasarathy, M.; Sahu, D. K.; Mohan, Vijay; Bhatt, B. C.; Thomas, Vineet S.

    2018-04-01

    The analysis of spectroscopic data for 30 Algol-type binaries is presented. All these systems are short period Algols having primaries with spectral types B and A. Dominant spectral lines were identified for the spectra collected and their equivalent widths were calculated. All the spectra were examined to understand presence of mass transfer, a disk or circumstellar matter and chromospheric emission. We also present first spectroscopic and period study for few Algols and conclude that high resolution spectra within and outside the primary minimum are needed for better understanding of these Algol type close binaries.

  20. Space Object and Light Attribute Rendering (SOLAR) Projection System

    Science.gov (United States)

    2017-05-08

    depicting the proposed SOLAR projection system. The installation process is shown in Fig. 3. SOLAR system comprises of a dome that houses Digitairum’s...imaging process. A fiberglass dome system was erected to make the SOLAR system a self contained facility. Calibration process was carried out to register...Separate software solutions were implemented to model the light transport processes involved in the imaging process. A fiberglass dome system was erected to

  1. Technology Investments in the NASA Entry Systems Modeling Project

    Science.gov (United States)

    Barnhardt, Michael; Wright, Michael; Hughes, Monica

    2017-01-01

    The Entry Systems Modeling (ESM) technology development project, initiated in 2012 under NASAs Game Changing Development (GCD) Program, is engaged in maturation of fundamental research developing aerosciences, materials, and integrated systems products for entry, descent, and landing(EDL)technologies [1]. To date, the ESM project has published over 200 papers in these areas, comprising the bulk of NASAs research program for EDL modeling. This presentation will provide an overview of the projects successes and challenges, and an assessment of future investments in EDL modeling and simulation relevant to NASAs mission

  2. Research on calibration algorithm in laser scanning projection system

    Science.gov (United States)

    Li, Li Juan; Qu, Song; Hou, Mao Sheng

    2017-10-01

    Laser scanning projection technology can project the image defined by the existing CAD digital model to the working surface, in the form of a laser harness profile. This projection is in accordance with the ratio of 1: 1. Through the laser harness contours with high positioning quality, the technical staff can carry out the operation with high precision. In a typical process of the projection, in order to determine the relative positional relationship between the laser projection instrument and the target, it is necessary to place several fixed reference points on the projection target and perform the calibration of projection. This position relationship is the transformation from projection coordinate system to the global coordinate system. The entire projection work is divided into two steps: the first step, the calculation of the projector six position parameters is performed, that is, the projector calibration. In the second step, the deflection angle is calculated by the known projector position parameter and the known coordinate points, and then the actual model is projected. Typically, the calibration requires the establishment of six reference points to reduce the possibility of divergence of the nonlinear equations, but the whole solution is very complex and the solution may still diverge. In this paper, the distance is detected combined with the calculation so that the position parameters of the projector can be solved by using the coordinate values of three reference points and the distance of at least one reference point to the projector. The addition of the distance measurement increases the stability of the solution of the nonlinear system and avoids the problem of divergence of the solution caused by the reference point which is directly under the projector. Through the actual analysis and calculation, the Taylor expansion method combined with the least squares method is used to obtain the solution of the system. Finally, the simulation experiment is

  3. White Pine Co. Public School System Biomass Conversion Heating Project

    Energy Technology Data Exchange (ETDEWEB)

    Paul Johnson

    2005-11-01

    The White Pine County School District and the Nevada Division of Forestry agreed to develop a pilot project for Nevada using wood chips to heat the David E. Norman Elementary School in Ely, Nevada. Consideration of the project was triggered by a ''Fuels for Schools'' grant that was brought to the attention of the School District. The biomass project that was part of a district-wide energy retrofit, called for the installation of a biomass heating system for the school, while the current fuel oil system remained as back-up. Woody biomass from forest fuel reduction programs will be the main source of fuel. The heating system as planned and completed consists of a biomass steam boiler, storage facility, and an area for unloading and handling equipment necessary to deliver and load fuel. This was the first project of it's kind in Nevada. The purpose of the DOE funded project was to accomplish the following goals: (1) Fuel Efficiency: Purchase and install a fuel efficient biomass heating system. (2) Demonstration Project: Demonstrate the project and gather data to assist with further research and development of biomass technology; and (3) Education: Educate the White Pine community and others about biomass and other non-fossil fuels.

  4. NNWSI project information management system concepts evaluation report. Final report

    International Nuclear Information System (INIS)

    1986-08-01

    This report is intended as a first step in developing detailed information management system specifications for the Nevada Nuclear Waste Storage Investigations (NNWSI) Project. The current state of information management at the NNWSI Project level is investigated and an information management system (IMS) is proposed. The IMS as it relates to aspects of Project and records management is discussed. Information management concepts and prospective IMS system components are investigated. Concepts and system components include: indexing, searching, retrieval, data base management system technology, computers, storage media, computer-assisted retrieval (CAR) of microfilm, electronic imaging-based systems, optical character recognition, and communications. Performance criteria and desirable system attributes applicable to the IMS are discussed. Six conceptual system approaches capable of satisfying the performance criteria are defined. System approaches include: fully centralized microfilm system based on CAR retrieval (Approach 1), partially distributed microfilm system based on CAR retrieval (Approach 2), fully distributed microfilm system based on CAR retrieval (Approach 3), fully centralized optical disk system based on electronic image and full-text retrieval (Approach 4), partially distributed optical system based on electron image and full-text retrieval (Approach 5), and fully distributed optical disk system based on electronic image and full-text retrieval (Approach 6). Technical and cost considerations associated with the six conceptual approaches are evaluated. Technical evaluation results indicate Approach 4 is the best conceptual approach, and cost evaluation results show no significant differences among approaches. On the basis of the evaluation, Approach 4 is recommended

  5. Stakeholder-driven multi-attribute analysis for energy project selection under uncertainty

    International Nuclear Information System (INIS)

    Read, Laura; Madani, Kaveh; Mokhtari, Soroush; Hanks, Catherine

    2017-01-01

    In practice, selecting an energy project for development requires balancing criteria and competing stakeholder priorities to identify the best alternative. Energy source selection can be modeled as multi-criteria decision-maker problems to provide quantitative support to reconcile technical, economic, environmental, social, and political factors with respect to the stakeholders' interests. Decision making among these complex interactions should also account for the uncertainty present in the input data. In response, this work develops a stochastic decision analysis framework to evaluate alternatives by involving stakeholders to identify both quantitative and qualitative selection criteria and performance metrics which carry uncertainties. The developed framework is illustrated using a case study from Fairbanks, Alaska, where decision makers and residents must decide on a new source of energy for heating and electricity. We approach this problem in a five step methodology: (1) engaging experts (role players) to develop criteria of project performance; (2) collecting a range of quantitative and qualitative input information to determine the performance of each proposed solution according to the selected criteria; (3) performing a Monte-Carlo analysis to capture uncertainties given in the inputs; (4) applying multi-criteria decision-making, social choice (voting), and fallback bargaining methods to account for three different levels of cooperation among the stakeholders; and (5) computing an aggregate performance index (API) score for each alternative based on its performance across criteria and cooperation levels. API scores communicate relative performance between alternatives. In this way, our methodology maps uncertainty from the input data to reflect risk in the decision and incorporates varying degrees of cooperation into the analysis to identify an optimal and practical alternative. - Highlights: • We develop an applicable stakeholder-driven framework for

  6. A Hybrid Instance Selection Using Nearest-Neighbor for Cross-Project Defect Prediction

    Institute of Scientific and Technical Information of China (English)

    Duksan Ryu; Jong-In Jang; Jongmoon Baik; Member; ACM; IEEE

    2015-01-01

    Software defect prediction (SDP) is an active research field in software engineering to identify defect-prone modules. Thanks to SDP, limited testing resources can be effectively allocated to defect-prone modules. Although SDP requires suffcient local data within a company, there are cases where local data are not available, e.g., pilot projects. Companies without local data can employ cross-project defect prediction (CPDP) using external data to build classifiers. The major challenge of CPDP is different distributions between training and test data. To tackle this, instances of source data similar to target data are selected to build classifiers. Software datasets have a class imbalance problem meaning the ratio of defective class to clean class is far low. It usually lowers the performance of classifiers. We propose a Hybrid Instance Selection Using Nearest-Neighbor (HISNN) method that performs a hybrid classification selectively learning local knowledge (via k-nearest neighbor) and global knowledge (via na¨ıve Bayes). Instances having strong local knowledge are identified via nearest-neighbors with the same class label. Previous studies showed low PD (probability of detection) or high PF (probability of false alarm) which is impractical to use. The experimental results show that HISNN produces high overall performance as well as high PD and low PF.

  7. Generalized projective synchronization of chaotic systems via adaptive learning control

    International Nuclear Information System (INIS)

    Yun-Ping, Sun; Jun-Min, Li; Hui-Lin, Wang; Jiang-An, Wang

    2010-01-01

    In this paper, a learning control approach is applied to the generalized projective synchronisation (GPS) of different chaotic systems with unknown periodically time-varying parameters. Using the Lyapunov–Krasovskii functional stability theory, a differential-difference mixed parametric learning law and an adaptive learning control law are constructed to make the states of two different chaotic systems asymptotically synchronised. The scheme is successfully applied to the generalized projective synchronisation between the Lorenz system and Chen system. Moreover, numerical simulations results are used to verify the effectiveness of the proposed scheme. (general)

  8. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    OpenAIRE

    Hudson, L. N.; Newbold, T.; Contu, S.; Hill, S. L.; Lysenko, I.; De Palma, A.; Phillips, H. R.; Alhusseini, T. I.; Bedford, F. E.; Bennett, D. J.; Booth, H.; Burton, V. J.; Chng, C. W.; Choimes, A.; Correia, D. L.

    2017-01-01

    The PREDICTS project-Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)-has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity of human impacts relating to land use. We have used this evidence base to develop global and regional statistical models of how local biodiversity responds to these measures. We describe and make free...

  9. Field verification of social and environmental issues of selected water sector projects in Punjab-Pakistan

    International Nuclear Information System (INIS)

    Ayesha, A.

    2012-01-01

    Irrigation helps in increasing the agricultural yield and the irrigation projects are carried out for the welfare of people. The importance of environment for sustainable development of irrigation projects has been realized. Environmental Impact Assessment is being increasingly used as a tool for appropriate environmental planning. In Pakistan, PEP A (Pakistan Environmental Protection Act),1997 establishes the framework to carry out Environmental Assessment of development projects. Various national and international agencies have developed Environmental Assessment Guidelines and Checklists for systematic evaluation of environmental impacts and their mitigation. The Social and Environmental Management Unit of Punjab Irrigation and Drainage Authority developed checklist for assessment of irrigation projects in 2007. The present study was conducted on three water sector projects namely: Concrete Lining of Dhudi Minor, Improving Nikki Deg Drain System and Rehabilitation of Khanki Barrage. The field verification of social and environmental issues of the projects was carried out according to the checklist of Social and Environmental Management Unit. The most noticeable impacts which were identified include: extended canal closure, emissions and effluents, waste generation and disposal, effect on flora, public health and safety, land acquisition, and social issues. The mitigatory measures proposed: proper project scheduling to minimize the canal closure periods, waste disposal through proper planning, preparation of detailed resettlement action plans and compensation, location of labor camps away from the settlements, avoiding unnecessary cutting of trees, and deployed machinery should be in good working condition. The recommendations of the study are to review and improve the checklists through a gradual and phased process into a more comprehensive social and environmental assessment process; capacity building of all the stake holders; collaboration between different

  10. Systematic approach to the application of automation, robotics, and machine intelligence systems (aramis) to future space projects

    Energy Technology Data Exchange (ETDEWEB)

    Smith, D B.S.

    1983-01-01

    The potential applications of automation, robotics and machine intelligence systems (ARAMIS) to space projects are investigated, through a systematic method. In this method selected space projects are broken down into space project tasks, and 69 of these tasks are selected for study. Candidate ARAMIS options are defined for each task. The relative merits of these options are evaluated according to seven indices of performance. Logical sequences of ARAMIS development are also defined. Based on this data, promising applications of ARAMIS are identified for space project tasks. General conclusions and recommendations for further study are also presented. 6 references.

  11. Understanding large social-ecological systems: introducing the SESMAD project

    Directory of Open Access Journals (Sweden)

    Michael Cox

    2014-08-01

    Full Text Available This article introduces the Social-ecological systems meta-analysis database (SESMAD project, which is the project behind the case studies and synthetic articles contained in this special issue of the International Journal of the Commons. SESMAD is an internationally collaborative meta-analysis project that builds on previous seminally synthetic work on small-scale common-pool resource systems conducted at the Workshop in Political Theory and Policy Analysis at Indiana University. This project is guided by the following research question: can the variables found to be important in explaining outcomes on small-scale systems be scaled up to explain outcomes in large-scale environmental governance? In this special issue we report on our findings thus far through a set of case studies of large-scale environmental governance, a paper that describes our conceptual advances, and a paper that compares these five case studies to further examine our central research question.

  12. Economy system and operation of a selected retail chain

    OpenAIRE

    KALUSOVÁ, Monika

    2011-01-01

    The goal of the thesis Economy system and operation of a selected retail chain is to explore and analyze the sphere in which the retailer chain operates, and evaluate their financial situation. At the same time, the selected retail chain will compare with the selected sectoral competition. The first part of thesis covers the theoretical information about issues, in particular the definition of basic terms of trade and retail. The second part of thesis includes application theoretical knowledg...

  13. Optimistic Selection Rule Better Than Majority Voting System

    Science.gov (United States)

    Sugiyama, Takuya; Obata, Takuya; Hoki, Kunihito; Ito, Takeshi

    A recently proposed ensemble approach to game-tree search has attracted a great deal of attention. The ensemble system consists of M computer players, where each player uses a different series of pseudo-random numbers. A combination of multiple players under the majority voting system would improve the performance of a Shogi-playing computer. We present a new strategy of move selection based on the search values of a number of players. The move decision is made by selecting one player from all M players. Each move is selected by referring to the evaluation value of the tree search of each player. The performance and mechanism of the strategy are examined. We show that the optimistic selection rule, which selects the player that yields the highest evaluation value, outperforms the majority voting system. By grouping 16 or more computer players straightforwardly, the winning rates of the strongest Shogi programs increase from 50 to 60% or even higher.

  14. Waste system optimization - can diameter selection

    International Nuclear Information System (INIS)

    Ashline, R.C.

    1983-08-01

    The purpose of the waste system optimization study is to define in terms of cost incentives the preferred waste package for HLW which has been converted to glass at a commercial reprocessing plant. The Waste Management Economic Model (WMEM) was employed to analyze the effect of varying important design parameters on the overall net present cost of waste handling. The parameters found to have the greatest effect on the calculated overall net present cost were can diameter, repository type (salt, basalt/bentonite, or welded tuff), allowable areal heat loading, and the repository availability date. The overall net present of a waste handling option is calculated over a 20-year operating period. It includes the total capital and operating costs associated with high-level and intermediate-level liquid waste storage, liquid waste solidification, hulls storage and compaction, and general process trash handling. It also includes the cask leasing and transportation costs associated with each waste type and the waste repository disposal costs. The waste repository disposal costs used in WMEM for this analysis were obtained from Battelle Pacific Northwest Laboratories and thir RECON model. 2 figures, 2 tables

  15. System biology and the project Encode

    Directory of Open Access Journals (Sweden)

    M. Yu. Obolenskaya

    2014-08-01

    Full Text Available The goal of this review is to give an incipient knowledge on the background of system biology, the premises to its assignment as a new branch of biology, its principles, methodology and its great achievements in identification of functional elements of human genome and regulation of their concordant­ and differential activity. The short characteristics of functional elements including the protein-coding sequences and those coding noncoding RNAs, the DNAse 1 hypersensitivity sites and methylated CpG islets, modified histones and specific 3D structure of chromatin, are represented. The topology of transcription factors network with its main motifs, hierar­chy, combination and association of transcription factors and their allelic specificity are highlighted­.

  16. The BIRN Project: Imaging the Nervous System

    International Nuclear Information System (INIS)

    Ellisman, Mark

    2006-01-01

    The grand goal in neuroscience research is to understand how the interplay of structural, chemical and electrical signals in nervous tissue gives rise to behavior. Experimental advances of the past decades have given the individual neuroscientist an increasingly powerful arsenal for obtaining data, from the level of molecules to nervous systems. Scientists have begun the arduous and challenging process of adapting and assembling neuroscience data at all scales of resolution and across disciplines into computerized databases and other easily accessed sources. These databases will complement the vast structural and sequence databases created to catalogue, organize and analyze gene sequences and protein products. The general premise of the neuroscience goal is simple; namely that with 'complete' knowledge of the genome and protein structures accruing rapidly we next need to assemble an infrastructure that will facilitate acquisition of an understanding for how functional complexes operate in their cell and tissue contexts.

  17. TMI defueling project fuel debris removal system

    International Nuclear Information System (INIS)

    Burdge, B.

    1992-01-01

    The three mile Island Unit 2 (TMI-2) pressurized water reactor loss-of-coolant accident on March 28, 1979, presented the nuclear community with many challenging remediation problems; most importantly, the removal of the fission products within the reactor containment vessel. To meet this removal problem, an air-lift system (ALS) can be used to employ compressed air to produce the motive force for transporting debris. Debris is separated from the transport stream by gravity separation. The entire method does not rely on any moving parts. Full-scale testing of the ALS at the Idaho National Engineering Laboratory (INEL) has demonstrated the capability of transporting fuel debris from beneath the LCSA into a standard fuel debris bucket at a minimum rate of 230 kg/min

  18. Project Management Consultancy (PMC) procurement approach: Supplier's evaluation and selection dilemma

    Science.gov (United States)

    Nawi, Mohd Nasrun Mohd; Azimi, Mohd Azrulfitri; Pozin, Mohd Affendi Ahmad; Osman, Wan Nadri; Anuar, Herman Shah

    2016-08-01

    Project Management Consultancy (PMC) is part of the management oriented procurement method in which a sole consultant is hired by the client to deal with the contactors in place of the client. Appointing contractors in this method or approach looks to be interesting as client could play a pivotal role in evaluating and selecting the supplier/contractor for the work package. In some cases, client gives the authority for the PMC to hire the supplier/contractor of their choice while in some cases the client is the one who made the decision. This research paper seeks to investigate the dilemma arises from this situation and for the purpose of this research, a real case study was studied to assess the impacts of such dilemma to the performance of the project. Recommendations on how to tackle the dilemma will also be addressed in the later part of this research paper.

  19. Selective elimination of intracortically projecting neurons of the rat neocortex by prenatal x-irradiation

    International Nuclear Information System (INIS)

    Jensen, K.F.

    1981-01-01

    The development of new racing methods has suggested that there are species differences in the extent of the contribution of the different layers of the neocortex to the callosal projection. The present investigation has utilized prenatal x-irradiation to selectively eliminate the late forming neurons of the supragranular layers of the rat neocortex. The reduction in the neuronal population of the supragranular layers closely parallels the reduction in the corpus callosum. These results indicate that the primary source of neurons of the callosal projection, are the late forming neurons of the supragranular layers. Thus, the current results suggest that low dose prenatal x-irradiation may be used to evaluate important developmental events in the formation of neocortical circuitry

  20. Selective tungsten deposition in a batch cold wall CVD system

    International Nuclear Information System (INIS)

    Chow, R.; Kang, S.; Harshbarger, W.R.; Susoeff, M.

    1987-01-01

    Selective deposition of tungsten offers many advantages for VLSI technology. The process can be used as a planarization technique for multilevel interconnect technology, it can be used to fill contacts and to provide a barrier layer between Al and Si materials, and the selective W process might be used as a self-aligned technology to provide low resistance layers on source/drain and gate conductors. Recent publications have indicate that cold wall CVD systems provide advantages for development of selective W process. Genus has investigated selective W deposition processing, and we have developed a selective W deposition process for the Genus 8402 multifilm deposition system. This paper describes the Genus 8402 system and the selective W process developed in this reactor. To further develop selective W technology, Genus has signed an agreement with General Electric establishing a joint development program. As a part of this program, the authors characterized the selective W process for encroachment, Si consumption and degrees of selectivity on various dielectrics. The status of this development activity and process characterization is reviewed in this paper

  1. An Objective Approach to Select Climate Scenarios when Projecting Species Distribution under Climate Change.

    Directory of Open Access Journals (Sweden)

    Nicolas Casajus

    Full Text Available An impressive number of new climate change scenarios have recently become available to assess the ecological impacts of climate change. Among these impacts, shifts in species range analyzed with species distribution models are the most widely studied. Whereas it is widely recognized that the uncertainty in future climatic conditions must be taken into account in impact studies, many assessments of species range shifts still rely on just a few climate change scenarios, often selected arbitrarily. We describe a method to select objectively a subset of climate change scenarios among a large ensemble of available ones. Our k-means clustering approach reduces the number of climate change scenarios needed to project species distributions, while retaining the coverage of uncertainty in future climate conditions. We first show, for three biologically-relevant climatic variables, that a reduced number of six climate change scenarios generates average climatic conditions very close to those obtained from a set of 27 scenarios available before reduction. A case study on potential gains and losses of habitat by three northeastern American tree species shows that potential future species distributions projected from the selected six climate change scenarios are very similar to those obtained from the full set of 27, although with some spatial discrepancies at the edges of species distributions. In contrast, projections based on just a few climate models vary strongly according to the initial choice of climate models. We give clear guidance on how to reduce the number of climate change scenarios while retaining the central tendencies and coverage of uncertainty in future climatic conditions. This should be particularly useful during future climate change impact studies as more than twice as many climate models were reported in the fifth assessment report of IPCC compared to the previous one.

  2. An Objective Approach to Select Climate Scenarios when Projecting Species Distribution under Climate Change.

    Science.gov (United States)

    Casajus, Nicolas; Périé, Catherine; Logan, Travis; Lambert, Marie-Claude; de Blois, Sylvie; Berteaux, Dominique

    2016-01-01

    An impressive number of new climate change scenarios have recently become available to assess the ecological impacts of climate change. Among these impacts, shifts in species range analyzed with species distribution models are the most widely studied. Whereas it is widely recognized that the uncertainty in future climatic conditions must be taken into account in impact studies, many assessments of species range shifts still rely on just a few climate change scenarios, often selected arbitrarily. We describe a method to select objectively a subset of climate change scenarios among a large ensemble of available ones. Our k-means clustering approach reduces the number of climate change scenarios needed to project species distributions, while retaining the coverage of uncertainty in future climate conditions. We first show, for three biologically-relevant climatic variables, that a reduced number of six climate change scenarios generates average climatic conditions very close to those obtained from a set of 27 scenarios available before reduction. A case study on potential gains and losses of habitat by three northeastern American tree species shows that potential future species distributions projected from the selected six climate change scenarios are very similar to those obtained from the full set of 27, although with some spatial discrepancies at the edges of species distributions. In contrast, projections based on just a few climate models vary strongly according to the initial choice of climate models. We give clear guidance on how to reduce the number of climate change scenarios while retaining the central tendencies and coverage of uncertainty in future climatic conditions. This should be particularly useful during future climate change impact studies as more than twice as many climate models were reported in the fifth assessment report of IPCC compared to the previous one.

  3. ECMS--Educational Contest Management System for Selecting Elite Students

    Science.gov (United States)

    Schneider, Thorsten

    2004-01-01

    Selecting elite students out of a huge collective is a difficult task. The main problem is to provide automated processes to reduce human work. ECMS (Educational Contest Management System) is an online tool approach to help--fully or partly automated--with the task of selecting such elite students out of a mass of candidates. International tests…

  4. A model for selecting project team members using multicriteria group decision making

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-04-01

    Full Text Available Selecting a project team is a complex multi-criteria decision-making problem. For this reason, one appropriate way to tackle such problems involves the use of multi-criteria decision aid methods. However, most of the decisions taken regarding the selection of project teams are made by a group of people. It is this which changes the focus of the problem by moving from one decision-maker (DM to a group of DMs. Analysis needs to be extended in order to consider the preference structure of each individual group member. In this paper, we present a group decision model for project team selection based on a multi-criteria evaluation of the preferences of a client's representatives. It could be applied to any decision problem since it involves a group of decision makers whose preferences diverge little. An application of the model in order to select consultants for a construction project is presented.A seleção da equipe em um projeto é um problema de decisão multicritério. Uma forma apropriada de tratar tais problemas envolve o uso de métodos de apoio multicritério a decisão. Grande parte desses problemas envolve um grupo de decisores. Dessa forma, há uma mudança no foco da decisão de um decisor para um grupo de decisores. A análise deve ser ampliada no intuito de considerar a estrutura de preferência de cada membro do grupo. Nesse artigo, apresentamos um modelo aplicado à seleção de equipe de um projeto baseado na avaliação multicritério das preferências dos representantes do cliente do projeto. Pode ser aplicado a qualquer problema de decisão desde que envolva um grupo de decisores que tenham pequena divergência em relação às suas preferências. Uma aplicação para seleção de parte da equipe de um projeto de construção é apresentada.

  5. Survey and analysis of selected jointly owned large-scale electric utility storage projects

    Energy Technology Data Exchange (ETDEWEB)

    1982-05-01

    The objective of this study was to examine and document the issues surrounding the curtailment in commercialization of large-scale electric storage projects. It was sensed that if these issues could be uncovered, then efforts might be directed toward clearing away these barriers and allowing these technologies to penetrate the market to their maximum potential. Joint-ownership of these projects was seen as a possible solution to overcoming the major barriers, particularly economic barriers, of commercializaton. Therefore, discussions with partners involved in four pumped storage projects took place to identify the difficulties and advantages of joint-ownership agreements. The four plants surveyed included Yards Creek (Public Service Electric and Gas and Jersey Central Power and Light); Seneca (Pennsylvania Electric and Cleveland Electric Illuminating Company); Ludington (Consumers Power and Detroit Edison, and Bath County (Virginia Electric Power Company and Allegheny Power System, Inc.). Also investigated were several pumped storage projects which were never completed. These included Blue Ridge (American Electric Power); Cornwall (Consolidated Edison); Davis (Allegheny Power System, Inc.) and Kttatiny Mountain (General Public Utilities). Institutional, regulatory, technical, environmental, economic, and special issues at each project were investgated, and the conclusions relative to each issue are presented. The major barriers preventing the growth of energy storage are the high cost of these systems in times of extremely high cost of capital, diminishing load growth and regulatory influences which will not allow the building of large-scale storage systems due to environmental objections or other reasons. However, the future for energy storage looks viable despite difficult economic times for the utility industry. Joint-ownership can ease some of the economic hardships for utilites which demonstrate a need for energy storage.

  6. Polycyclic selection system for the tropical rainforests of northern Australia

    Science.gov (United States)

    Glen T. Dale; Grahame B. Applegate

    1992-01-01

    The polycyclic selection logging system developed and practiced for many years in the tropical rainforests of north Queensland has been successful in integrating timber production with the protection of conservation values. The system has been used by the Queensland Forest Service to manage north Queensland rainforests. The Queensland system has considerable potential...

  7. Sequence Selection and Performance in DS/CDMA Systems

    Directory of Open Access Journals (Sweden)

    Jefferson Santos Ambrosio

    2016-03-01

    Full Text Available In this work key concepts on coding division multiple access (CDMA communication systems have been discussed. The sequence selection impact on the performance and capacity of direct sequence CDMA (DS/CDMA systems under AWGN and increasing system loading, as well as under multiple antennas channels was investigated.

  8. Space Station Freedom regenerative water recovery system configuration selection

    Science.gov (United States)

    Reysa, R.; Edwards, J.

    1991-01-01

    The Space Station Freedom (SSF) must recover water from various waste water sources to reduce 90 day water resupply demands for a four/eight person crew. The water recovery system options considered are summarized together with system configuration merits and demerits, resource advantages and disadvantages, and water quality considerations used to select the SSF water recovery system.

  9. Matching People and Jobs: Value Systems and Employee Selection.

    Science.gov (United States)

    Heflich, Debra L.

    1981-01-01

    Offers strategies, based on six value systems, to reduce employee turnover. Maintains that understanding the value systems of people as they relate to jobs is the key to improving the selection process, and that employees should be chosen in accordance with how well their value systems match their work and work environments.

  10. Effective selection of transgenic papaya plants with the PMI/Man selection system.

    Science.gov (United States)

    Zhu, Yun J; Agbayani, Ricelle; McCafferty, Heather; Albert, Henrik H; Moore, Paul H

    2005-09-01

    The selectable marker gene phospho-mannose isomerase (pmi), which encodes the enzyme phospho-mannose isomerase (PMI) to enable selection of transformed cell lines on media containing mannose (Man), was evaluated for genetic transformation of papaya (Carica papaya L.). We found that papaya embryogenic calli have little or no PMI activity and cannot utilize Man as a carbon source; however, when calli were transformed with a pmi gene, the PMI activity was greatly increased and they could utilize Man as efficiently as sucrose. Plants regenerated from selected callus lines also exhibited PMI activity but at a lower specific activity level. Our transformation efficiency with Man selection was higher than that reported using antibiotic selection or with a visual marker. For papaya, the PMI/Man selection system for producing transgenic plants is a highly efficient addition to previously published methods for selection and may facilitate the stacking of multiple transgenes of interest. Additionally, since the PMI/Man selection system does not involve antibiotic or herbicide resistance genes, its use might reduce environmental concerns about the potential flow of those genes into related plant populations.

  11. Selection Methodology Approach to Preferable and Alternative Sites for the First NPP Project in Yemen

    Energy Technology Data Exchange (ETDEWEB)

    Kassim, Moath [Kyunghe Univ., Yongin (Korea, Republic of); Kessel, David S. [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2015-05-15

    The purpose of this paper is to briefly present the methodology and results of the first siting study for the first nuclear power plant (NPP) in Yemen. In this study it has been demonstrated that there are suitable sites for specific unit/units power of 1000 MWt (about 300 MWe) nuclear power plant. To perform the site selection, a systematic selection method was developed. The method uses site-specific data gathered by literature review and expert judgement to identify the most important site selection criteria. A two-step site selection process was used. Candidate sites were chosen that meet a subset of the selection criteria that form the most important system constraints. These candidate sites were then evaluated against the full set of selection criteria using the Analytical Hierarchy Process Method (AHP). Candidate sites underwent a set of more specific siting criteria weighted by expert judgment to select preferable sites and alternatives using AHP method again. Expert Judgment method was used to rank and weight the importance of each criteria, then AHP method used to evaluate and weight the relation between criterion to criterion and between all criteria against the global weight. Then logical decision software was used to rank sites upon their weighting value.

  12. Selection Methodology Approach to Preferable and Alternative Sites for the First NPP Project in Yemen

    International Nuclear Information System (INIS)

    Kassim, Moath; Kessel, David S.

    2015-01-01

    The purpose of this paper is to briefly present the methodology and results of the first siting study for the first nuclear power plant (NPP) in Yemen. In this study it has been demonstrated that there are suitable sites for specific unit/units power of 1000 MWt (about 300 MWe) nuclear power plant. To perform the site selection, a systematic selection method was developed. The method uses site-specific data gathered by literature review and expert judgement to identify the most important site selection criteria. A two-step site selection process was used. Candidate sites were chosen that meet a subset of the selection criteria that form the most important system constraints. These candidate sites were then evaluated against the full set of selection criteria using the Analytical Hierarchy Process Method (AHP). Candidate sites underwent a set of more specific siting criteria weighted by expert judgment to select preferable sites and alternatives using AHP method again. Expert Judgment method was used to rank and weight the importance of each criteria, then AHP method used to evaluate and weight the relation between criterion to criterion and between all criteria against the global weight. Then logical decision software was used to rank sites upon their weighting value

  13. A projective surgical navigation system for cancer resection

    Science.gov (United States)

    Gan, Qi; Shao, Pengfei; Wang, Dong; Ye, Jian; Zhang, Zeshu; Wang, Xinrui; Xu, Ronald

    2016-03-01

    Near infrared (NIR) fluorescence imaging technique can provide precise and real-time information about tumor location during a cancer resection surgery. However, many intraoperative fluorescence imaging systems are based on wearable devices or stand-alone displays, leading to distraction of the surgeons and suboptimal outcome. To overcome these limitations, we design a projective fluorescence imaging system for surgical navigation. The system consists of a LED excitation light source, a monochromatic CCD camera, a host computer, a mini projector and a CMOS camera. A software program is written by C++ to call OpenCV functions for calibrating and correcting fluorescence images captured by the CCD camera upon excitation illumination of the LED source. The images are projected back to the surgical field by the mini projector. Imaging performance of this projective navigation system is characterized in a tumor simulating phantom. Image-guided surgical resection is demonstrated in an ex-vivo chicken tissue model. In all the experiments, the projected images by the projector match well with the locations of fluorescence emission. Our experimental results indicate that the proposed projective navigation system can be a powerful tool for pre-operative surgical planning, intraoperative surgical guidance, and postoperative assessment of surgical outcome. We have integrated the optoelectronic elements into a compact and miniaturized system in preparation for further clinical validation.

  14. Shippingport Station Decommissioning Project (SSDP): configuration control system and project activity controls

    International Nuclear Information System (INIS)

    Mullee, G.R.

    1986-01-01

    The SSDP has been using a Configuration Control system as a significant element in the management plan for the safe and effective performance of the project. The objective of the Configuration Control system is to control the physical plant configuration, system status, work schedules, status tracking, and day-to-day problem resolution. Prior to the Decommissioning Operations Contractor (DOC) assuming operational responsibility for the Shippingport Plant, an assessment was made of the status of the configuration of the systems and related documentation. Action was taken as required to match the operating procedures and system documentation with the actual physical condition of the plant. During the first stage of the project, planning was put in place for subsequent decommissioning activities. This planning included defining organizational responsibilities, completing the necessary project instructions and procedures, and doing the planning and scheduling for the subsequent decommissioning phase activities. Detailed instructions for the performance of the various decommissioning tasks were prepared. Prior to the start of any work on a given Activity Package, a Work Authorization is required. The Work Authorization form provides a complete checklist to ensure that all necessary prerequisites are completed. A computerized Communications Configuration Control Information system monitors status including information on system status, tag-outs, radiological work permits, etc. An ongoing effort is being directed toward maintaining operating instructions and system schematics, etc. current as the Plant configuration changes. The experience with the Configuration Control System to date has been favorable

  15. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project FY17 Annual Review

    Science.gov (United States)

    Sakahara, Robert; Hackenberg, Davis; Johnson, William

    2017-01-01

    This presentation was presented to the Integrated Aviation Systems Program at the FY17 Annual Review of the UAS-NAS project. The presentation captures the overview of the work completed by the UAS-NAS project and its subprojects.

  16. CooMan - a global collaborative project management system

    International Nuclear Information System (INIS)

    Souza, J.M. de; Palma, S.

    1994-01-01

    Project Coordination and Management have long been recognized as an area with growing problems and unsatisfactory solutions. Conciliating flexibility with target achievements is historically the main problem to face. The difficulties have been growing at more than linear ratio with the size and complexity of the Projects being developed in the present days. The HEP communities suffer additional challenges because of the distributed nature of the collaborations, the novelty of each project; and the less authoritarian form of leadership and management of team and individual. This prevents the adoption of more centralized focus on decision. CooMan intends to be a Global Collaborative Project Management System. This paper discusses the basic aspects of the concepts involved, outlining how task coordination, acts of speech, and World-Wide hyper media can be used to support project management activities. A distributed tool to implement such proposition is described, and a first prototype is presented

  17. Selective Attention in Multi-Chip Address-Event Systems

    Directory of Open Access Journals (Sweden)

    Giacomo Indiveri

    2009-06-01

    Full Text Available Selective attention is the strategy used by biological systems to cope with the inherent limits in their available computational resources, in order to efficiently process sensory information. The same strategy can be used in artificial systems that have to process vast amounts of sensory data with limited resources. In this paper we present a neuromorphic VLSI device, the “Selective Attention Chip” (SAC, which can be used to implement these models in multi-chip address-event systems. We also describe a real-time sensory-motor system, which integrates the SAC with a dynamic vision sensor and a robotic actuator. We present experimental results from each component in the system, and demonstrate how the complete system implements a real-time stimulus-driven selective attention model.

  18. Selective attention in multi-chip address-event systems.

    Science.gov (United States)

    Bartolozzi, Chiara; Indiveri, Giacomo

    2009-01-01

    Selective attention is the strategy used by biological systems to cope with the inherent limits in their available computational resources, in order to efficiently process sensory information. The same strategy can be used in artificial systems that have to process vast amounts of sensory data with limited resources. In this paper we present a neuromorphic VLSI device, the "Selective Attention Chip" (SAC), which can be used to implement these models in multi-chip address-event systems. We also describe a real-time sensory-motor system, which integrates the SAC with a dynamic vision sensor and a robotic actuator. We present experimental results from each component in the system, and demonstrate how the complete system implements a real-time stimulus-driven selective attention model.

  19. Managing Selection for Electronic Resources: Kent State University Develops a New System to Automate Selection

    Science.gov (United States)

    Downey, Kay

    2012-01-01

    Kent State University has developed a centralized system that manages the communication and work related to the review and selection of commercially available electronic resources. It is an automated system that tracks the review process, provides selectors with price and trial information, and compiles reviewers' feedback about the resource. It…

  20. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  1. Selective correlations in finite quantum systems and the Desargues property

    Science.gov (United States)

    Lei, C.; Vourdas, A.

    2018-06-01

    The Desargues property is well known in the context of projective geometry. An analogous property is presented in the context of both classical and Quantum Physics. In a classical context, the Desargues property implies that two logical circuits with the same input show in their outputs selective correlations. In general their outputs are uncorrelated, but if the output of one has a particular value, then the output of the other has another particular value. In a quantum context, the Desargues property implies that two experiments each of which involves two successive projective measurements have selective correlations. For a particular set of projectors, if in one experiment the second measurement does not change the output of the first measurement, then the same is true in the other experiment.

  2. The ESPRIT project CAFE : high security digital payment systems

    NARCIS (Netherlands)

    Boly, J.P.; Bosselaers, A.; Cramer, R.; Michelsen, R.; Mjølsnes, S.F.; Muller, F.; Pedersen, T.P.; Pfitzmann, B.; Rooij, de P.; Schoenmakers, B.; Schunter, M.; Vallée, L.; Waidner, M.; Gollmann, D.

    1994-01-01

    CAFE (“Conditional Access for Europe”) is an ongoing project in the European Community's ESPRIT program. The goal of CAFE is to develop innovative systems for conditional access, and in particular, digital payment systems. An important aspect of CAFE is high security of all parties concerned, with

  3. Automated Procurement System (APS) revised project management plan (DS-03)

    Science.gov (United States)

    Murphy, Diane R.

    1995-01-01

    The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  4. Realization of economic evaluation expert system for uranium mine project

    International Nuclear Information System (INIS)

    Wang Haifeng

    1993-01-01

    By studying the EVALUATOR, economic evaluation expert system of uranium mine project, the theoretical fundamentals of expert system, principle of inference mechanism, implementation of knowledge base, realization of explanation mechanism, acquisition of domain knowledge and representation of knowledge were described, especially the subjective Bayes approach for inexact reasoning problem used in EVALUATOR was discussed in detail

  5. MULTIPLE PROJECTIONS SYSTEM (MPS) - USER'S MANUAL VERSION 1.0

    Science.gov (United States)

    The report is a user's manual for version 1.0 of the Multiple Projections Systems (MPS), a computer system that can perform "what if" scenario analysis and report the final results (i.e., Rate of Further Progress - ROP - inventories) to EPA (i.e., the Aerometric Information Retri...

  6. IAEA safeguards information system re-engineering project (IRP)

    International Nuclear Information System (INIS)

    Whitaker, G.; Becar, J.-M.; Ifyland, N.; Kirkgoeze, R.; Koevesd, G.; Szamosi, L.

    2007-01-01

    The Safeguards Information System Re-engineering Project (IRP) was initiated to assist the IAEA in addressing current and future verification and analysis activities through the establishment of a new information technology framework for strengthened and integrated safeguards. The Project provides a unique opportunity to enhance all of the information services for the Department of Safeguards and will require project management 'best practices' to balance limited funds, available resources and Departmental priorities. To achieve its goals, the Project will require the participation of all stakeholders to create a comprehensive and cohesive plan that provides both a flexible and stable foundation for address changing business needs. The expectation is that high quality integrated information systems will be developed that incorporate state-of-the-art technical architectural standards, improved business processes and consistent user interfaces to store various data types in an enterprise data repository which is accessible on-line in a secure environment. (author)

  7. A model for strategic selection of feeder management systems: A case study

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Hsing Hung [Faculty of Management and Administration, Macau University of Science and Technology, Avenue Wei Long, Taipa, Macau (China); Lee, Amy H.I. [Department of Industrial Management, Chung Hua University, No. 707, Sec. 2, Wu Fu Rd., Hsinchu 300 (China); Kang, He-Yau [Department of Industrial Engineering and Management, National Chin-Yi University of Technology, 35, Lane 215, Sec. 1, Chung San Rd., Taiping, Taichung 411 (China)

    2010-06-15

    The move to integrating distribution management system (DMS) and feeder management system (FMS) in China is becoming the main trend in recent years, in addition to upgrading and rebuilding existing energy management system (EMS) and DMS. However, with increasing complexity in the social environments along with rapidly changing technologies, how to select a suitable contractor and a FMS project is becoming an important issue for electric power companies. This paper first briefly introduces FMS and then lists its critical success criteria. A model that applies a multi-criteria decision-making (MCDM) method, an analytic network process (ANP) associated with benefits, opportunities, costs and risks (BOCR), is constructed to help power companies to select the most suitable FMS project. (author)

  8. A Cognitive Model of Document Use during a Research Project. Study I. Document Selection.

    Science.gov (United States)

    Wang, Peiling; Soergel, Dagobert

    1998-01-01

    Proposes a model of document selection by real users of a bibliographic retrieval system. Reports on Part I of a longitudinal study of decision making on document use by academics (25 faculty and graduate students in Agricultural Economics). Examines what components are relevant to the users' decisions and what cognitive process may have occurred…

  9. Optimal Parameter Selection of Power System Stabilizer using Genetic Algorithm

    Energy Technology Data Exchange (ETDEWEB)

    Chung, Hyeng Hwan; Chung, Dong Il; Chung, Mun Kyu [Dong-AUniversity (Korea); Wang, Yong Peel [Canterbury Univeristy (New Zealand)

    1999-06-01

    In this paper, it is suggested that the selection method of optimal parameter of power system stabilizer (PSS) with robustness in low frequency oscillation for power system using real variable elitism genetic algorithm (RVEGA). The optimal parameters were selected in the case of power system stabilizer with one lead compensator, and two lead compensator. Also, the frequency responses characteristics of PSS, the system eigenvalues criterion and the dynamic characteristics were considered in the normal load and the heavy load, which proved usefulness of RVEGA compare with Yu's compensator design theory. (author). 20 refs., 15 figs., 8 tabs.

  10. Analytical simulation platform describing projections in computed tomography systems

    International Nuclear Information System (INIS)

    Youn, Hanbean; Kim, Ho Kyung

    2013-01-01

    To reduce the patient dose, several approaches such as spectral imaging using photon counting detectors and statistical image reconstruction, are being considered. Although image-reconstruction algorithms may significantly enhance image quality in reconstructed images with low dose, true signal-to-noise properties are mainly determined by image quality in projections. We are developing an analytical simulation platform describing projections to investigate how quantum-interaction physics in each component configuring CT systems affect image quality in projections. This simulator will be very useful for an improved design or optimization of CT systems in economy as well as the development of novel image-reconstruction algorithms. In this study, we present the progress of development of the simulation platform with an emphasis on the theoretical framework describing the generation of projection data. We have prepared the analytical simulation platform describing projections in computed tomography systems. The remained further study before the meeting includes the following: Each stage in the cascaded signal-transfer model for obtaining projections will be validated by the Monte Carlo simulations. We will build up energy-dependent scatter and pixel-crosstalk kernels, and show their effects on image quality in projections and reconstructed images. We will investigate the effects of projections obtained from various imaging conditions and system (or detector) operation parameters on reconstructed images. It is challenging to include the interaction physics due to photon-counting detectors into the simulation platform. Detailed descriptions of the simulator will be presented with discussions on its performance and limitation as well as Monte Carlo validations. Computational cost will also be addressed in detail. The proposed method in this study is simple and can be used conveniently in lab environment

  11. Goal Selection for Embedded Systems with Oversubscribed Resources

    Science.gov (United States)

    Rabideau, Gregg; Chien, Steve; McLaren, David

    2010-01-01

    We describe an efficient, online goal selection algorithm and its use for selecting goals at runtime. Our focus is on the re-planning that must be performed in a timely manner on the embedded system where computational resources are limited. In particular, our algorithm generates near optimal solutions to problems with fully specified goal requests that oversubscribe available resources but have no temporal flexibility. By using a fast, incremental algorithm, goal selection can be postponed in a "just-in-time" fashion allowing requests to be changed or added at the last minute. This enables shorter response cycles and greater autonomy for the system under control.

  12. An accurate projection algorithm for array processor based SPECT systems

    International Nuclear Information System (INIS)

    King, M.A.; Schwinger, R.B.; Cool, S.L.

    1985-01-01

    A data re-projection algorithm has been developed for use in single photon emission computed tomography (SPECT) on an array processor based computer system. The algorithm makes use of an accurate representation of pixel activity (uniform square pixel model of intensity distribution), and is rapidly performed due to the efficient handling of an array based algorithm and the Fast Fourier Transform (FFT) on parallel processing hardware. The algorithm consists of using a pixel driven nearest neighbour projection operation to an array of subdivided projection bins. This result is then convolved with the projected uniform square pixel distribution before being compressed to original bin size. This distribution varies with projection angle and is explicitly calculated. The FFT combined with a frequency space multiplication is used instead of a spatial convolution for more rapid execution. The new algorithm was tested against other commonly used projection algorithms by comparing the accuracy of projections of a simulated transverse section of the abdomen against analytically determined projections of that transverse section. The new algorithm was found to yield comparable or better standard error and yet result in easier and more efficient implementation on parallel hardware. Applications of the algorithm include iterative reconstruction and attenuation correction schemes and evaluation of regions of interest in dynamic and gated SPECT

  13. Work flow management systems. Selection of Platforms and tools

    International Nuclear Information System (INIS)

    Munoz Garcia, M.

    1997-01-01

    This paper addresses a formal procedure for selecting the Platform and tools necessary to implement a Work Flow system in a company's organisation. The proposed method is based on a preliminary study to ascertain the company's requirements; in other words, the tool is selected on the basis of the environment in which it is to be used, thus making it essential to know the frequency of use, the types of tasks to be executed, the complexity of work flow, etc. Once the preliminary study has been performed, the formal selection method does no differ greatly from that for selecting any other tool. The objective is to establish a series of weighted parameters so that each candidate configuration can be assessed and one finally selected. Lastly, the paper discusses some practical considerations which became evident during the selection of a work flow management tool for our own company. (Author)

  14. A Hybrid MCDM Approach for Strategic Project Portfolio Selection of Agro By-Products

    Directory of Open Access Journals (Sweden)

    Animesh Debnath

    2017-07-01

    Full Text Available Due to the increasing size of the population, society faces several challenges for sustainable and adequate agricultural production, quality, distribution, and food safety in the strategic project portfolio selection (SPPS. The initial adaptation of strategic portfolio management of genetically modified (GM Agro by-products (Ab-Ps is a huge challenge in terms of processing the agro food product supply-chain practices in an environmentally nonthreatening way. As a solution to the challenges, the socio-economic characteristics for SPPS of GM food purchasing scenarios are studied. Evaluation and selection of the GM agro portfolio management are the dynamic issues due to physical and immaterial criteria involving a hybrid multiple criteria decision making (MCDM approach, combining modified grey Decision-Making Trial and Evaluation Laboratory (DEMATEL, Multi-Attributive Border Approximation area Comparison (MABAC and sensitivity analysis. Evaluation criteria are grouped into social, differential and beneficial clusters, and the modified DEMATEL procedure is used to derive the criteria weights. The MABAC method is applied to rank the strategic project portfolios according to the aggregated preferences of decision makers (DMs. The usefulness of the proposed research framework is validated with a case study. The GM by-products are found to be the best portfolio. Moreover, this framework can unify the policies of agro technological improvement, corporate social responsibility (CSR and agro export promotion.

  15. Selection of the best consultant for SAP ERP project using combined AHP-IBA approach

    Directory of Open Access Journals (Sweden)

    Martinović Nataša

    2014-01-01

    Full Text Available In this paper we propose a combined AHP-IBA model for selecting the best SAP consultant for an SAP ERP project. The goal of the SAP Project Manager is to choose the best consultant, the one who is able to implement standard SAP functionalities with quality and on time. When making a decision on the basis of multiple criteria, the traditional Analytic Hierarchy Process (AHP method does not take into account the fact that attributes may correlate, assuming that there are no dependencies between them. However, the dependencies of the attributes can often be used to model important knowledge for multiple criteria decision analysis. We propose an extension to the traditional AHP method by applying Interpolative realization of Boolean algebra (IBA, using AHP to determine the criteria weights, and IBA to model the logical interactions among criteria. The research conducted on ERP consultant selection suggests that the decision making process is modelled more accurately if logical interactions between attributes are modelled before applying AHP.

  16. Handbook of selected organ doses for projections common in pediatric radiology

    International Nuclear Information System (INIS)

    Rosenstein, M.; Beck, T.J.; Warner, G.G.

    1979-05-01

    This handbook contains data from which absorbed dose (mrad) to selected organs can be estimated for common projections in pediatric radiology. The organ doses are for three reference patients: a newborn (0 to 6 months), a 1-year old child, and a 5-year old child. One intent of the handbook is to permit the user to evaluate the effect on organ dose to these reference pediatric patients as a function of certain changes in technical parameters used in or among facilities. A second intent is to permit a comparison to be made of organ doses as a function of age. This comparison can be extended to a reference adult by referring to the previous Handbook of Selected Organ Doses fo Projections Common in Diagnostic Radiology, FDA 76-8031. Assignment of organ doses to individual pediatric patients using the Handbook data is not recommended unless the physical characteristics of the patient closely correlate with one of the three reference pediatric patients given in Appendix A

  17. Fringe-period selection for a multifrequency fringe-projection phase unwrapping method

    International Nuclear Information System (INIS)

    Zhang, Chunwei; Zhao, Hong; Jiang, Kejian

    2016-01-01

    The multi-frequency fringe-projection phase unwrapping method (MFPPUM) is a typical phase unwrapping algorithm for fringe projection profilometry. It has the advantage of being capable of correctly accomplishing phase unwrapping even in the presence of surface discontinuities. If the fringe frequency ratio of the MFPPUM is too large, fringe order error (FOE) may be triggered. FOE will result in phase unwrapping error. It is preferable for the phase unwrapping to be kept correct while the fewest sets of lower frequency fringe patterns are used. To achieve this goal, in this paper a parameter called fringe order inaccuracy (FOI) is defined, dominant factors which may induce FOE are theoretically analyzed, a method to optimally select the fringe periods for the MFPPUM is proposed with the aid of FOI, and experiments are conducted to research the impact of the dominant factors in phase unwrapping and demonstrate the validity of the proposed method. Some novel phenomena are revealed by these experiments. The proposed method helps to optimally select the fringe periods and detect the phase unwrapping error for the MFPPUM. (paper)

  18. Multi-period project portfolio selection under risk considerations and stochastic income

    Science.gov (United States)

    Tofighian, Ali Asghar; Moezzi, Hamid; Khakzar Barfuei, Morteza; Shafiee, Mahmood

    2018-02-01

    This paper deals with multi-period project portfolio selection problem. In this problem, the available budget is invested on the best portfolio of projects in each period such that the net profit is maximized. We also consider more realistic assumptions to cover wider range of applications than those reported in previous studies. A novel mathematical model is presented to solve the problem, considering risks, stochastic incomes, and possibility of investing extra budget in each time period. Due to the complexity of the problem, an effective meta-heuristic method hybridized with a local search procedure is presented to solve the problem. The algorithm is based on genetic algorithm (GA), which is a prominent method to solve this type of problems. The GA is enhanced by a new solution representation and well selected operators. It also is hybridized with a local search mechanism to gain better solution in shorter time. The performance of the proposed algorithm is then compared with well-known algorithms, like basic genetic algorithm (GA), particle swarm optimization (PSO), and electromagnetism-like algorithm (EM-like) by means of some prominent indicators. The computation results show the superiority of the proposed algorithm in terms of accuracy, robustness and computation time. At last, the proposed algorithm is wisely combined with PSO to improve the computing time considerably.

  19. Survey of siting practices for selected management projects in seven countries

    International Nuclear Information System (INIS)

    Hardin, E.; Aahagen, H.

    1992-06-01

    This paper surveys siting practices for deep geologic disposal in seven countries, and attempts to formulate generalizations which could be useful for the upcoming review of the Swedish plan for siting the SFL repository (R and D 92). Comparison of projects in different countries is done with full appreciation of the technical, legal, and cultural differences. The seven countries were selected for experience with siting in crystalline rock, similarity of siting practices to Sweden, and the availability of published information. Local governments have demonstrated effective veto power in each of the seven countries surveyed, although this power is exercised in different ways. This paper shows how the siting strategy itself affects the ability and the inclination of localities to block the project. It shows by example that public involvement, parallel vs. sequential characterization, schedule for siting activities, and the existence of interim waste storage capability have an impact on the success of siting. The focus of this paper is deep geologic disposal. Shallow land disposal and non-radioactive wastes are not discussed in detail, with three exceptions: LLW disposal siting in the U.S. and Canada, and the SAKAB incinerator projects in Sweden. These provide insight into siting approaches and demonstrate that conclusions regarding deep geologic disposal are supported by other experience. (114 refs.) (au)

  20. Multi-criteria decision-making in the selection of a renewable energy project in spain: The Vikor method

    International Nuclear Information System (INIS)

    San Cristobal, J.R.

    2011-01-01

    One of the characteristics of the Spanish energy system is its high degree of dependence on imports. In 2005, the Spanish government approved the new Renewable Energy Plan in the following sectors: Windpower, Hydroelectric, Solar Thermal, Solar Thermo-electric, Photovoltaic, Biomass, Biogas and Biofuels. The aim of the Plan is to make it possible to reach the target of 12% of primary energy being met from renewable sources by 2010. When selecting one from various Renewable Energy investment projects different groups of decision-makers become involved in the process. Decision-making has to take into consideration several conflicting objectives because of the increasingly complex social, economic, technological, and environmental factors that are present. Traditional single-criterion decision-making is no longer able to handle these problems. The Compromise Ranking method, also known as the VIKOR method, introduces the Multi-criteria ranking index based on the particular measure of ''closeness'' to the ''ideal'' solution. In this paper, we apply the method in the selection of a Renewable Energy project corresponding to the Renewable Energy Plan launched by the Spanish Government. The method is combined with the Analytical Hierarchy Process method for weighting the importance of the different criteria, which allows decision-makers to assign these values based on their preferences. The results show that the Biomass plant option (Co-combustion in a conventional power plant) is the best choice, followed by the Wind power and Solar Thermo-electric alternatives. (author)

  1. Systems engineering management plan for the Salt Repository Project

    International Nuclear Information System (INIS)

    Neff, J.O.

    1986-08-01

    This document presents the plan for using systems engineering in conducting and managing the technical work of the Salt Repository Project (SRP) of the US Department of Energy's Civilian Radioactive Waste Management Program. The need for preparing a Systems Engineering Management Plan (SEMP) is traced back to relevant DOE directives. These directives are interpreted as SRP requirements in the context of the Mined Geologic Disposal System. The strategy for conducting systems engineering on the SRP, including the role of the systems engineering process, is then described. The SEMP also designates who in the project organization will be responsible for carrying out the activities. Finally, the management tools that are used to implement the systems engineering process, including associated documentation on the SRP, are described

  2. Distributed Physical and Molecular Separations for Selective Harvest of Higher Value Wheat Straw Components Project

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2004-09-30

    Wheat straw (Triticum aestivum L.) is an abundant source of plant fiber. It is regenerated, in large quantities, every year. At present, this potentially valuable resource is greatly under-exploited. Most of the excess straw biomass (i.e., tonnage above that required for agronomic cropping system sustainability) is managed through expensive chopping/tillage operations and/or burnt in the field following harvest, resulting in air pollution and associated health problems. Potential applications for wheat straw investigated within this project include energy and composites manufacture. Other methods of straw utilization that will potentially benefit from the findings of this research project include housing and building, pulp and paper, thermal insulation, fuels, and chemicals. This project focused on components of the feedstock assembly system for supplying a higher value small grains straw residue for (1) gasification/combustion and (2) straw-thermoplastic composites. This project was an integrated effort to solve the technological, infrastructural, and economic challenges associated with using straw residue for these bioenergy and bioproducts applications. The objective of the research is to contribute to the development of a low-capital distributed harvesting and engineered storage system for upgrading wheat straw to more desirable feedstocks for combustion and for straw-plastic composites. They investigated two processes for upgrading wheat straw to a more desirable feedstock: (1) an efficient combine-based threshing system for separating the intermodal stems from the leaves, sheaths, nodes, and chaff. (2) An inexpensive biological process using white-rot fungi to improve the composition of the mechanically processed straw stems.

  3. Distributed Physical and Molecular Separations for Selective Harvest of Higher Value Wheat Straw Components Project

    Energy Technology Data Exchange (ETDEWEB)

    Hess, J.R

    2005-01-31

    Wheat straw (Triticum aestivum L.) is an abundant source of plant fiber. It is regenerated, in large quantities, every year. At present, this potentially valuable resource is greatly under-exploited. Most of the excess straw biomass (i.e., tonnage above that required for agronomic cropping system sustainability) is managed through expensive chopping/tillage operations and/or burnt in the field following harvest, resulting in air pollution and associated health problems. Potential applications for wheat straw investigated within this project include energy and composites manufacture. Other methods of straw utilization that will potentially benefit from the findings of this research project include housing and building, pulp and paper, thermal insulation, fuels, and chemicals. This project focused on components of the feedstock assembly system for supplying a higher value small grains straw residue for (1) gasification/combustion and (2) straw-thermoplastic composites. This project was an integrated effort to solve the technological, infrastructural, and economic challenges associated with using straw residue for these bioenergy and bioproducts applications. The objective of the research is to contribute to the development of a low-capital distributed harvesting and engineered storage system for upgrading wheat straw to more desirable feedstocks for combustion and for straw-plastic composites. We investigated two processes for upgrading wheat straw to a more desirable feedstock: (1) An efficient combine-based threshing system for separating the internodal stems from the leaves, sheaths, nodes, and chaff. (2) An inexpensive biological process using white-rot fungi to improve the composition of the mechanically processed straw stems.

  4. System engineering and science projects: lessons from MeerKAT

    Science.gov (United States)

    Kapp, Francois

    2016-08-01

    The Square Kilometre Array (SKA) is a large science project planning to commence construction of the world's largest Radio Telescope after 2018. MeerKAT is one of the precursor projects to the SKA, based on the same site that will host the SKA Mid array in the central Karoo area of South Africa. From the perspective of signal processing hardware development, we analyse the challenges that MeerKAT encountered and extrapolate them to SKA in order to prepare the System Engineering and Project Management methods that could contribute to a successful completion of SKA. Using the MeerKAT Digitiser, Correlator/Beamformer and Time and Frequency Reference Systems as an example, we will trace the risk profile and subtle differences in engineering approaches of these systems over time and show the effects of varying levels of System Engineering rigour on the evolution of their risk profiles. It will be shown that the most rigorous application of System Engineering discipline resulted in the most substantial reduction in risk over time. Since the challenges faced by SKA are not limited to that of MeerKAT, we also look into how that translates to a system development where there is substantial complexity in both the created system as well as the creating system. Since the SKA will be designed and constructed by consortia made up from the ten member countries, there are many additional complexities to the organisation creating the system - a challenge the MeerKAT project did not encounter. Factors outside of engineering, for instance procurement models and political interests, also play a more significant role, and add to the project risks of SKA when compared to MeerKAT.

  5. Integrated monitoring and surveillance system demonstration project: Phase I accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Crawford, D.C.

    1997-01-01

    The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables

  6. Focusing Information Systems Post-Graduate Research Projects

    Directory of Open Access Journals (Sweden)

    Gail Ridley

    1996-11-01

    Full Text Available This paper reports on an investigation of mechanisms that assist Information Systems post-graduate research students to focus their projects. An evaluation is presented of the experiences of Information Systems research students in focussing their research projects based on a survey conducted of students who participated in two of the first three Information Systems doctoral consortia to be held in Australia. The survey sought to determine whether a doctoral consortium or 'systematic expert review' is the most valuable mechanism for focussing a research proposal. Systematic expert review was considered by the students to be more effective than the doctoral consortium process for the purpose of focussing their research project proposals.

  7. Basic Research on Selecting ISDC Activity for Decommissioning Costing in KRR-2 Decommissioning Project Experience Data

    Energy Technology Data Exchange (ETDEWEB)

    Song, Chan-Ho; Park, Hee-Seong; Jin, Hyung-Gon; Park, Seung-Kook [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    KAERI is performing research for calculation of expected time of a decommissioning work and evaluation of decommissioning cost and this research calculate a decommissioning work unit productivity based on the experience data of decommissioning activity for KRR-2. The KAERI be used to calculate the decommissioning cost and manage the experience data from the decommissioning activity through the Decommissioning Information Management System (DECOMMIS), Decommissioning Facility Characterization DB System (DEFACS), and Decommissioning Work-unit Productivity Calculation System (DEWOCS). In this paper, the methodology was presented how select the ISDC activities in dismantling work procedures of a 'removal of radioactive concrete'. The reason to select the 'removal of radioactive concrete' is main key activity and generates the amount of radioactive waste. This data will take advantage of the cost estimation after the code for the selected items derived ISDC. There are various efforts for decommissioning costing in each country. In particular, OECD/NEA recommends decommissioning cost estimation using the ISDC and IAEA provides for Cost Estimation for Research Reactors in Excel (CERREX) program that anyone is easy to use the cost evaluation from a limited decommissioning experience in domestic. In the future, for the decommissioning cost evaluation, the ISDC will be used more widely in a strong position. This paper has described a method for selecting the ISDC item from the actual dismantling work procedures.

  8. Sandia photovoltaic systems definition and application experiment projects

    Energy Technology Data Exchange (ETDEWEB)

    Jones, G.

    1983-04-01

    A compilation is given of the abstracts and visual material used in presentation at the Fourth Photovoltaic Systems Definition and Applications Projects Integration Meeting held at the Marriott Hotel, April 12-14, 1983, in Albuquerque, New Mexico. The meeting provided a forum for detailed analyses on recently completed and current activities. These activities include systems research, balance-of-system technology development, residential experimentation, and evaluation of intermediate-sized applications.

  9. SNF sludge treatment system preliminary project execution plan

    International Nuclear Information System (INIS)

    Flament, T.A.

    1998-01-01

    The Fluor Daniel Hanford, Inc. (FDH) Project Director for the Spent Nuclear Fuel (SNF) Project has requested Numatec Hanford Company (NHC) to define how Hanford would manage a new subproject to provide a process system to receive and chemically treat radioactive sludge currently stored in the 100 K Area fuel retention basins. The subproject, named the Sludge Treatment System (STS) Subproject, provides and operates facilities and equipment to chemically process K Basin sludge to meet Tank Waste Remediation System (TWRS) requirements. This document sets forth the NHC management approach for the STS Subproject and will comply with the requirements of the SNF Project Management Plan (HNF-SD-SNFPMP-011). This version of this document is intended to apply to the initial phase of the subproject and to evolve through subsequent revision to include all design, fabrication, and construction conducted on the project and the necessary management and engineering functions within the scope of the subproject. As Project Manager, NHC will perform those activities necessary to complete the STS Subproject within approved cost and schedule baselines and turn over to FDH facilities, systems, and documentation necessary for operation of the STS

  10. Majoring in Information Systems: Reasons Why Students Select (or Not) Information Systems as a Major

    Science.gov (United States)

    Snyder, Johnny; Slauson, Gayla Jo

    2014-01-01

    Filling the pipeline for information systems workers is critical in the information era. Projected growth rates for jobs requiring information systems expertise are significantly higher than the projected growth rates for other jobs. Why then do relatively few students choose to major in information systems? This paper reviews survey results from…

  11. Project 11. Cowpea - Cereals Systems Improvement in the Dry Savannas

    International Nuclear Information System (INIS)

    1998-01-01

    The research agenda of the IITA is subdivided into a portfolio of 16 projects (Annex 1), around which these annual reports are prepared. These projects address different aspects of attaining sustainable increases in productivity of dominant farming systems and utilization practices in the various agroecologies of Sub-Saharan Africa (SSA). Research and training activities carried out in the 16 projects are being implemented together with national program partners in order to increase the well-being of poor people in SSA through higher levels of food production, better income and nutritional status, and reduced drudgery - particularly for women. Additionally IITA serves as the convening centre for the Ecoregional Program for the Humid and Sub Humid Tropics of Sub-Saharan Africa (EPHTA) and the Systemwide Project on Integrated Pest Management (SP-IPM). The institute-wide log frame (Annex 2) shows the expected contribution of each project to the overall institute goal, with the specific project log frame presented in Annex 3. Highlights from all these projects can be found in Annex 4, which thus provides an illustrative overview of IITA's research activities and achievements of the year. Annex 5 shows all the agroecological zones of sub-saharan Africa in which IITA conducts research. The project management arrangement for implementing IITA's research agenda is relatively new, and continues to evolve from a divisional/program structure. In earlier years, detailed research outputs and achievements were reported in divisional reports; this is the third year that implementation of IITA's research agenda is being presented in individual project reports. To satisfy the continuing needs of disciplinary groups in partner and other interested institutions, portions from the individual project reports will be collated into subject matter reports corresponding to current research divisions -Crop improvement, Plant Health Management, and Resource and Crop Management

  12. Methodical bases of selection and evaluation of the effectiveness of the projects of the urban territory renovation

    Science.gov (United States)

    Sizova, Evgeniya; Zhutaeva, Evgeniya; Chugunov, Andrei

    2018-03-01

    The article highlights features of processes of urban territory renovation from the perspective of a commercial entity participating in the implementation of a project. The requirements of high-rise construction projects to the entities, that carry out them, are considered. The advantages of large enterprises as participants in renovation projects are systematized, contributing to their most efficient implementation. The factors, which influence the success of the renovation projects, are presented. A method for selecting projects for implementation based on criteria grouped by qualitative characteristics and contributing to the most complete and comprehensive evaluation of the project is suggested. Patterns to prioritize and harmonize renovation projects in terms of multi-project activity of the enterprise are considered.

  13. Unmanned Aircraft Systems Integration in the National Airspace System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — There is an increasing need to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) to perform missions of vital importance to national security...

  14. A modular projection autostereoscopic system for stereo cinema

    Science.gov (United States)

    Elkhov, Victor A.; Kondratiev, Nikolai V.; Ovechkis, Yuri N.; Pautova, Larisa V.

    2009-02-01

    The lenticular raster system for 3D movies non-glasses show designed by NIKFI demonstrated commercially in Moscow in the 40'st of the last century. Essential lack of this method was narrow individual viewing zone as only two images on the film used. To solve this problem, we propose to use digital video projective system with modular principle of its design. Increase of the general number of the pixels forming the stereo image is reached by using of more than one projector. The modular projection autostereoscopic system for demonstration of the 3D movies includes diffuser screen; lenticular plate located in front of the screen; projective system consisted from several projectors and the block of parallax panoramogram fragments creator. By means of this block the parallax panoramogram is broken into fragments which quantity corresponds to number of projectors. For the large dimension lenticular screen making rectangular fragments of inclined raster were joined in a uniform leaf. To obtain the needed focal distance of the screen lenses we used immersion - aqueous solution of glycerin. The immersion also let essentially decrease visibility of fragments joints. An experimental prototype of the modular projection autostereoscopic system was created to validate proposed system.

  15. Measure Guideline: Selecting Ventilation Systems for Existing Homes

    Energy Technology Data Exchange (ETDEWEB)

    Aldrich, Robb [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2014-02-01

    This document addresses adding -or improving - mechanical ventilation systems to existing homes. The purpose of ventilation is to remove contaminants from homes, and this report discusses where, when, and how much ventilation is appropriate in a home, including some discussion of relevant codes and standards. Advantages, disadvantages, and approximate costs of various system types are presented along with general guidelines for implementing the systems in homes. CARB intends for this document to be useful to decision makers and contractors implementing ventilation systems in homes. Choosing the "best" system is not always straightforward; selecting a system involves balancing performance, efficiency, cost, required maintenance, and several other factors. It is the intent of this document to assist contractors in making more informed decisions when selecting systems. Ventilation is an integral part of a high-performance home. With more air-sealed envelopes, a mechanical means of removing contaminants is critical for indoor environmental quality and building durability.

  16. Scarab/Saffron Development Project Case study: Material Selection Criteria for the Monoethylene Glycol Recovery Package

    International Nuclear Information System (INIS)

    Moussa, A.M.; Habib, S.; Shinaishin, A.

    2004-01-01

    MEG Recovery Unit for Scarab/Saffron development project is the first application in gas production. The Mono Ethylene Glycol Recovery Unit (MEG) recovers MEG from Water/MEG stream and removes salts and other contaminants. MEG Recovery Unit Equipment Design Criteria were designed for two parallel trains A and B, each train is capable to treat 500 bbl MEG, 1500 bbl water and 9 ton salt. The MEG unit is a combination of two unit operations; MEG Recovery unit is normally applicable in the oil and gas industries that is applying distillation technique, while the new technology is salt treatment and handling. The MEG Unit material selection is made to be suitable for the entire design life which is 25 years, the materials for MEG Recovery Unit have been selected among the available corrosion resistance alloys, where requested by the service and ambient conditions. Therefore all. the parts of the MEG unit that are in saline service are in either (2205 duplex, AISI 316L) and in Inconel alloy 625 related to operating temperature. This case study focused at Inconel alloy 625, which is selected for salt service and their operation problem occurred during the construction and operating conditions

  17. Debris Removal Project K West Canister Cleaning System Performance Specification

    International Nuclear Information System (INIS)

    FARWICK, C.C.

    1999-01-01

    Approximately 2,300 metric tons Spent Nuclear Fuel (SNF) are currently stored within two water filled pools, the 105 K East (KE) fuel storage basin and the 105 K West (KW) fuel storage basin, at the U.S. Department of Energy, Richland Operations Office (RL). The SNF Project is responsible for operation of the K Basins and for the materials within them. A subproject to the SNF Project is the Debris Removal Subproject, which is responsible for removal of empty canisters and lids from the basins. Design criteria for a Canister Cleaning System to be installed in the KW Basin. This documents the requirements for design and installation of the system

  18. Modified scaling function projective synchronization of chaotic systems

    International Nuclear Information System (INIS)

    Xu Yu-Hua; Zhou Wu-Neng; Fang Jian-An

    2011-01-01

    This paper investigates a kind of modified scaling function projective synchronization of uncertain chaotic systems using an adaptive controller. The given scaling function in the new method can be an equilibrium point, a periodic orbit, or even a chaotic attractor in the phase space. Based on LaSalle's invariance set principle, the adaptive control law is derived to make the states of two chaotic systems function projective synchronized. Some numerical examples are also given to show the effectiveness of the proposed method. (general)

  19. Image reconstruction technique using projection data from neutron tomography system

    Directory of Open Access Journals (Sweden)

    Waleed Abd el Bar

    2015-12-01

    Full Text Available Neutron tomography is a very powerful technique for nondestructive evaluation of heavy industrial components as well as for soft hydrogenous materials enclosed in heavy metals which are usually difficult to image using X-rays. Due to the properties of the image acquisition system, the projection images are distorted by several artifacts, and these reduce the quality of the reconstruction. In order to eliminate these harmful effects the projection images should be corrected before reconstruction. This paper gives a description of a filter back projection (FBP technique, which is used for reconstruction of projected data obtained from transmission measurements by neutron tomography system We demonstrated the use of spatial Discrete Fourier Transform (DFT and the 2D Inverse DFT in the formulation of the method, and outlined the theory of reconstruction of a 2D neutron image from a sequence of 1D projections taken at different angles between 0 and π in MATLAB environment. Projections are generated by applying the Radon transform to the original image at different angles.

  20. Function projective lag synchronization of fractional-order chaotic systems

    International Nuclear Information System (INIS)

    Wang Sha; Yu Yong-Guang; Wang Hu; Rahmani Ahmed

    2014-01-01

    Function projective lag synchronization of different structural fractional-order chaotic systems is investigated. It is shown that the slave system can be synchronized with the past states of the driver up to a scaling function matrix. According to the stability theorem of linear fractional-order systems, a nonlinear fractional-order controller is designed for the synchronization of systems with the same and different dimensions. Especially, for two different dimensional systems, the synchronization is achieved in both reduced and increased dimensions. Three kinds of numerical examples are presented to illustrate the effectiveness of the scheme. (general)

  1. Photovoltaic Test and Demonstration Project. [for solar cell power systems

    Science.gov (United States)

    Forestieri, A. F.; Brandhorst, H. W., Jr.; Deyo, J. N.

    1976-01-01

    The Photovoltaic Test and Demonstration Project was initiated by NASA in June, 1975, to develop economically feasible photovoltaic power systems suitable for a variety of terrestrial applications. Objectives include the determination of operating characteristic and lifetimes of a variety of solar cell systems and components and development of methodology and techniques for accurate measurements of solar cell and array performance and diagnostic measurements for solar power systems. Initial work will be concerned with residential applications, with testing of the first prototype system scheduled for June, 1976. An outdoor 10 kW array for testing solar power systems is under construction.

  2. Unigrace - A Project For The Unification of Gravity Systems In Central Europe

    Science.gov (United States)

    Richter, B.; Falk, R.; Erker, E.; Ruess, D.; Mäkinen, J.; Hinderer, J.; Marson, I.; Sledzinski, J.

    Because of the present trends of political and economical unification in Europe for- merly classified gravimetric data in Central Europe are becoming available. The dif- ferences, however, between gravity systems in this area are so large that they strongly affect the geoid, vertical datum definitions and height systems. It is therefore manda- tory to study system differences and to unify them. The project UNIGRACE aims at solving this problem by carrying out absolute grav- ity measurements with the most advanced technology at 17 selected sites in the coun- tries concerned. In a joint effort five European groups from Austria, Finland, France, Germany, Italy and Poland using their absolute gravimeters and partners from Bul- garia, Croatia, Czech Republic, Hungary, Romania, Slovakia and Slovenia cooperate in selecting and/or establishing the sites and performing the measurements as well as in connecting the absolute sites to the national gravimetric networks. As a result, a unique gravity system in Central Europe will be available. The project started on Jan. 1, 1998 and till the end of 2000 all selected gravity sites have been observed twice by absolute gravimeters. From these repeated measurements the final results for this project will be presented which was granted by the European Commission.

  3. Project management in mine actions using Multi-Criteria-Analysis-based decision support system

    Directory of Open Access Journals (Sweden)

    Marko Mladineo

    2014-12-01

    Full Text Available In this paper, a Web-based Decision Support System (Web DSS, that supports humanitarian demining operations and restoration of mine-contaminated areas, is presented. The financial shortage usually triggers a need for priority setting in Project Management in Mine actions. As part of the FP7 Project TIRAMISU, a specialized Web DSS has been developed to achieve a fully transparent priority setting process. It allows stakeholders and donors to actively join the decision making process using a user-friendly and intuitive Web application. The main advantage of this Web DSS is its unique way of managing a mine action project using Multi-Criteria Analysis (MCA, namely the PROMETHEE method, in order to select priorities for demining actions. The developed Web DSS allows decision makers to use several predefined scenarios (different criteria weights or to develop their own, so it allows project managers to compare different demining possibilities with ease.

  4. High-Lift Propeller System Configuration Selection for NASA's SCEPTOR Distributed Electric Propulsion Flight Demonstrator

    Science.gov (United States)

    Patterson, Michael D.; Derlaga, Joseph M.; Borer, Nicholas K.

    2016-01-01

    Although the primary function of propellers is typically to produce thrust, aircraft equipped with distributed electric propulsion (DEP) may utilize propellers whose main purpose is to act as a form of high-lift device. These \\high-lift propellers" can be placed upstream of wing such that, when the higher-velocity ow in the propellers' slipstreams interacts with the wing, the lift is increased. This technique is a main design feature of a new NASA advanced design project called Scalable Convergent Electric Propulsion Technology Operations Research (SCEPTOR). The goal of the SCEPTOR project is design, build, and y a DEP aircraft to demonstrate that such an aircraft can be much more ecient than conventional designs. This paper provides details into the high-lift propeller system con guration selection for the SCEPTOR ight demonstrator. The methods used in the high-lift propeller system conceptual design and the tradeo s considered in selecting the number of propellers are discussed.

  5. ERP system implementation costs and selection factors of an implementation approach

    DEFF Research Database (Denmark)

    Johansson, Björn; Sudzina, Frantisek; Newman, Mike

    2011-01-01

    , which influence the implementation approach in an ERP project, cause also an increase of the project cost in a European context? Our survey was conducted in Denmark, Slovakia and Slovenia and focused on this issue. Our main findings are that: 1) the number of implemented modules influences selection......Different approaches on implementation of enterprise resource planning (ERPs) systems exist. In this article, we investigate relationship between factors influencing selection of implementation approach and companies' ability to stay within budget when implementing ERPs. The question is: do factors...... of an implementation approach; 2) companies with information strategies are more likely to stay within budget regarding ERP systems implementation. However, we also found that: 3) implementation approach does not significantly influence ability to stay within budget; 4) a clear relationship between factors influencing...

  6. Projecting technology change to improve space technology planning and systems management

    Science.gov (United States)

    Walk, Steven Robert

    2011-04-01

    Projecting technology performance evolution has been improving over the years. Reliable quantitative forecasting methods have been developed that project the growth, diffusion, and performance of technology in time, including projecting technology substitutions, saturation levels, and performance improvements. These forecasts can be applied at the early stages of space technology planning to better predict available future technology performance, assure the successful selection of technology, and improve technology systems management strategy. Often what is published as a technology forecast is simply scenario planning, usually made by extrapolating current trends into the future, with perhaps some subjective insight added. Typically, the accuracy of such predictions falls rapidly with distance in time. Quantitative technology forecasting (QTF), on the other hand, includes the study of historic data to identify one of or a combination of several recognized universal technology diffusion or substitution patterns. In the same manner that quantitative models of physical phenomena provide excellent predictions of system behavior, so do QTF models provide reliable technological performance trajectories. In practice, a quantitative technology forecast is completed to ascertain with confidence when the projected performance of a technology or system of technologies will occur. Such projections provide reliable time-referenced information when considering cost and performance trade-offs in maintaining, replacing, or migrating a technology, component, or system. This paper introduces various quantitative technology forecasting techniques and illustrates their practical application in space technology and technology systems management.

  7. Project W-340 tank 241-C-106 manipulator system closeout summary

    International Nuclear Information System (INIS)

    McDaniel, L.B.

    1995-02-01

    This document summarizes the work that was ongoing when Project W-340 was put on hold. Project W-340: Tank 241-C-106 Manipulator Retrieval System, was a candidate FY98 Major System Acquisition. The project was to develop, procure and deploy a Long Reach Manipulator (LRM) waste retrieval system to provide an alternate method to completing the in-tank demonstration of Single Shell Tank waste retrieval technology. The need for enhanced capabilities derives from (1) the inability of the baseline technology to retrieve certain hard waste forms; (2) uncertainty in the quantity of leakage which will be allowed. Numerous studies over the years have identified an arm architecture as a promising retrieval technology to overcome these concerns. The W340 project was intended to further develop and demonstrate this alternative, as part of selecting the best approach for all tanks. Prior to completing the effort, it was determined that an LRM system was too architecture specific and was envisioned to be too expensive for a one time demonstration of retrieval technology. At the time the work was stopped, an effort was underway to broaden the project scope to allow alternatives to an arm-based system

  8. Hydrogen selective membrane for the natural gas system. Development of CO{sub 2}-selective biogas membrane. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Vestboe, A.P.

    2012-02-15

    The project started as a literature study and technology development project for a hydrogen selective membrane for the natural gas system. The introduction of hydrogen (for example produced from wind turbines by surplus electricity) in the gas system makes it possible to store energy which can be selectively used with high energy conversion in fuel cells directly located at the end users. In order to make this possible, it is necessary to have a separating unit that can selectively remove hydrogen from the gas mixture and deliver it as fuel to the electrical generator (a fuel cell). In the project, several existing technologies were evaluated with regard to the application in view. It was concluded that while other technologies are ripe, they are costly in energy and unsuitable for the relatively low capacity application that are in question close to the end users. Membrane technology was evaluated to be the most suitable, although the technology is still under development in many cases. In the project it was found that metallic membranes in the form of palladium coated stainless discs would answer the needs for the high purity needed. Laboratory development yielded discs that could separate hydrogen from natural gas, however, the flux was low compared to the needs of the application. It was found that at least 2 bar pressure difference of hydrogen would be needed to get a high enough flux. The way to achieve this pressure would necessitate a compressor which would consume an energy amount high enough to invalidate the concept. When concluding on the results and the study it was found that the direction of the project could be changed towards developing CO{sub 2}-selective membranes with the goal of developing membrane technology that could upgrade biogas by removing CO{sub 2}. The laboratory equipment and setup that were developed in the first part of the project could be used directly in this second part of the project. In this second part of the project it was

  9. Short communication: Genomic selection in a crossbred cattle population using data from the Dairy Genetics East Africa Project.

    Science.gov (United States)

    Brown, A; Ojango, J; Gibson, J; Coffey, M; Okeyo, M; Mrode, R

    2016-09-01

    Due to the absence of accurate pedigree information, it has not been possible to implement genetic evaluations for crossbred cattle in African small-holder systems. Genomic selection techniques that do not rely on pedigree information could, therefore, be a useful alternative. The objective of this study was to examine the feasibility of using genomic selection techniques in a crossbred cattle population using data from Kenya provided by the Dairy Genetics East Africa Project. Genomic estimated breeding values for milk yield were estimated using 2 prediction methods, GBLUP and BayesC, and accuracies were calculated as the correlation between yield deviations and genomic breeding values included in the estimation process, mimicking the situation for young bulls. The accuracy of evaluation ranged from 0.28 to 0.41, depending on the validation population and prediction method used. No significant differences were found in accuracy between the 2 prediction methods. The results suggest that there is potential for implementing genomic selection for young bulls in crossbred small-holder cattle populations, and targeted genotyping and phenotyping should be pursued to facilitate this. Copyright © 2016 American Dairy Science Association. Published by Elsevier Inc. All rights reserved.

  10. Operator psychological selection system for nuclear power plant

    International Nuclear Information System (INIS)

    He Xuhong; Huang Xiangrui

    2004-01-01

    Based on a detailed job analysis of nuclear power plant operator including operation procedures analysis, interview with personnel familiar with operator job, and 9 events happened in the past in the plant involved operator error analysis, several operator work characteristics and performance influence factors are obtained. According to these specific characteristics and factors, referring to the psychological selection research results in the other related critical occupational fields, a full psychological selection system of nuclear power plant operator is forwarded in this paper, including 21 dimensions in 3 facets as general psychological ability, personality and psychological healthy. Practical measurement methods for the proposed selection dimensions are discussed in the end

  11. XUV free-electron laser-based projection lithography systems

    Energy Technology Data Exchange (ETDEWEB)

    Newnam, B.E.

    1990-01-01

    Free-electron laser sources, driven by rf-linear accelerators, have the potential to operate in the extreme ultraviolet (XUV) spectral range with more than sufficient average power for high-volume projection lithography. For XUV wavelengths from 100 nm to 4 nm, such sources will enable the resolution limit of optical projection lithography to be extended from 0.25 {mu}m to 0.05{mu}m and with an adequate total depth of focus (1 to 2 {mu}m). Recent developments of a photoinjector of very bright electron beams, high-precision magnetic undulators, and ring-resonator cavities raise our confidence that FEL operation below 100 nm is ready for prototype demonstration. We address the motivation for an XUV FEL source for commercial microcircuit production and its integration into a lithographic system, include reflecting reduction masks, reflecting XUV projection optics and alignment systems, and surface-imaging photoresists. 52 refs., 7 figs.

  12. Acousto-optic laser projection systems for displaying TV information

    Energy Technology Data Exchange (ETDEWEB)

    Gulyaev, Yu V [V.A.Kotel' nikov Institute of Radio Engineering and Electronics, Russian Academy of Sciences, Moscow (Russian Federation); Kazaryan, M A [P N Lebedev Physics Institute, Russian Academy of Sciences, Moscow (Russian Federation); Mokrushin, Yu M [D.V. Efremov Scientific Research Institute of Electrophysical Apparatus (Russian Federation); Shakin, O V [Ioffe Physical Technical Institute, Russian Academy of Sciences, St. Petersburg (Russian Federation)

    2015-04-30

    This review addresses various approaches to television projection imaging on large screens using lasers. Results are presented of theoretical and experimental studies of an acousto-optic projection system operating on the principle of projecting an image of an entire amplitude-modulated television line in a single laser pulse. We consider characteristic features of image formation in such a system and the requirements for its individual components. Particular attention is paid to nonlinear distortions of the image signal, which show up most severely at low modulation signal frequencies. We discuss the feasibility of improving the process efficiency and image quality using acousto-optic modulators and pulsed lasers. Real-time projectors with pulsed line imaging can be used for controlling high-intensity laser radiation. (review)

  13. Acousto-optic laser projection systems for displaying TV information

    International Nuclear Information System (INIS)

    Gulyaev, Yu V; Kazaryan, M A; Mokrushin, Yu M; Shakin, O V

    2015-01-01

    This review addresses various approaches to television projection imaging on large screens using lasers. Results are presented of theoretical and experimental studies of an acousto-optic projection system operating on the principle of projecting an image of an entire amplitude-modulated television line in a single laser pulse. We consider characteristic features of image formation in such a system and the requirements for its individual components. Particular attention is paid to nonlinear distortions of the image signal, which show up most severely at low modulation signal frequencies. We discuss the feasibility of improving the process efficiency and image quality using acousto-optic modulators and pulsed lasers. Real-time projectors with pulsed line imaging can be used for controlling high-intensity laser radiation. (review)

  14. Acousto-optic laser projection systems for displaying TV information

    Science.gov (United States)

    Gulyaev, Yu V.; Kazaryan, M. A.; Mokrushin, Yu M.; Shakin, O. V.

    2015-04-01

    This review addresses various approaches to television projection imaging on large screens using lasers. Results are presented of theoretical and experimental studies of an acousto-optic projection system operating on the principle of projecting an image of an entire amplitude-modulated television line in a single laser pulse. We consider characteristic features of image formation in such a system and the requirements for its individual components. Particular attention is paid to nonlinear distortions of the image signal, which show up most severely at low modulation signal frequencies. We discuss the feasibility of improving the process efficiency and image quality using acousto-optic modulators and pulsed lasers. Real-time projectors with pulsed line imaging can be used for controlling high-intensity laser radiation.

  15. Comparison of selected approaches to finance renewable energy projects in European countries

    International Nuclear Information System (INIS)

    Langniss, O.

    1999-01-01

    A large number of proven technical solutions exists for the use of renewable energies. However, their dissemination is still too slow to meet the political goal of substituting for 8-15% of the primary energy demand in the European Union by the year 2010. Even renewable energy systems (RES) with an economic potential are only partly exploited. The FIRE research project financed partly in the JOULE program analyses and compares the means of financing RES in Austria, Denmark, Germany, the Netherlands, Spain, Sweden and the United Kingdom to put forward best practice recommendations so that renewable energy depolyments will occur at a faster rate. FIRE addresses to politicians, to potential investors and to project-developers. (orig./RHM)

  16. Long-Term Evaluation of SSL Field Performance in Select Interior Projects

    Energy Technology Data Exchange (ETDEWEB)

    Perrin, Tess E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Davis, Robert G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wilkerson, Andrea M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-02-28

    This GATEWAY project evaluated four field installations to better understand the long-term performance of a number of LED products, which can hopefully stimulate improvements in designing, manufacturing, specifying, procuring, and installing LED products. Field studies provide the opportunity to discover and investigate issues that cannot be simulated or uncovered in a laboratory, but the installed performance over time of commercially available LED products has not been well documented. Improving long-term performance can provide both direct energy savings by reducing the need to over-light to account for light loss and indirect energy savings through better market penetration due to SSL’s competitive advantages over less-efficient light source technologies. The projects evaluated for this report illustrate that SSL use is often motivated by advantages other than energy savings, including maintenance savings, easier integration with control systems, and improved lighting quality.

  17. Application of system simulation to WCH boiler selection

    NARCIS (Netherlands)

    Hensen, J.L.M.; Kabele, K.

    1997-01-01

    This paper reports the first results of an ongoing project aimed at generating design information/knowledge for wet central heating (WCH) refurbishment in multi-family houses in Central Europe. In that practical context, integral modelling and simulation of a building and its heating system is

  18. System Engineering Management and Implementation Plan for Project W-211, ''Initial Tank Retrieval Systems'' (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211

  19. System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    Energy Technology Data Exchange (ETDEWEB)

    VAN BEEK, J.E.

    2000-05-05

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

  20. Review of selected 100-N waste sites related to N-Springs remediation projects

    International Nuclear Information System (INIS)

    DeFord, D.H.; Carpenter, R.W.

    1996-01-01

    This document has been prepared in support of the environmental restoration program at the US Department of Energy's Hanford Site near Richland, Washington, by the Bechtel Hanford, Inc. Facility and Waste Site Research Office. It provides historical information that documents and characterizes selected waste sites that are related to the N-Springs remediation projects. The N-Springs are a series of small, inconspicuous groundwater seepage springs located along the Columbia River shoreline near the 100-N Reactor. The spring site is hydrologically down-gradient from several 100-N Area liquid waste sites that are believed to have been the source(s) of the effluents being discharged by the springs. This report documents and characterizes these waste sites, including the 116-N-1 Crib and Trench, 116-N-3 Crib and Trench, unplanned releases, septic tariks, and a backwash pond

  1. On the relationship between perceived importance of ERP systems selection characteristics and satisfaction with selected ERP systems in these characteristics

    DEFF Research Database (Denmark)

    Sudzina, Frantisek; Pucihar, Andreja; Lenart, Gregor

    2011-01-01

    of the relationship between the two. The paper focuses on the correlation between importance of ERP system selection criteria and the level of satisfaction with the chosen ERP systems in these characteristics. The research hypothesis is that there exists a correlation between the two. The analysis presented...

  2. About Nano-JASMINE Satellite System and Project Status

    Science.gov (United States)

    Sako, Nobutada

    Intelligent Space Systems Laboratory, The University of Tokyo (ISSL) and National Astronomical Observatory of Japan (NAO) have been developing a small infrared astrometry satellite named “Nano-JASMINE”. The satellite size is about 50cm cubic and 20kg, which plays a pre-cursor role of JASMINE Project which is programmed by NAO and JAXA. In addition, since there has been only one astrometry satellite HIPPARCOS by ESA in the past, Nano-JASMINE is also expected to achieve certain scientific results in the field of astrometry. In this project, ISSL aims to develop new advanced small satellite bus system whose performance is comparable to that of 100-500kg sized satellites, including attitude stability of 1 arc-second and thermal stability of the mission subsystem of 1 mK. This paper overviews the Nano-JASMINE bus system with emphasis on attitude and thermal control systems.

  3. Integrated Monitoring and Surveillance System demonstration project. Phase 2 accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Singleterry, R.C.

    1997-01-01

    The paper presents the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase 2 efforts. the rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include further development of the data acquisition system and procurement of necessary hardware/software, options and associated costs for plutonium canning systems and gloveboxes, initiation of facility modifications, determination of possibly affected facility documentation, results from sensor system trade study, and preliminary storage configuration designs. Resources invested during Phase 1 and Phase 2 are summarized and budgetary requirements for completion of Phase 3 presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase 2 deliverables

  4. The Virtual Factory Teaching System (VFTS): Project Review and Results.

    Science.gov (United States)

    Kazlauskas, E. J.; Boyd, E. F., III; Dessouky, M. M.

    This paper presents a review of the Virtual Factory Teaching (VFTS) project, a Web-based, multimedia collaborative learning network. The system allows students, working alone or in teams, to build factories, forecast demand for products, plan production, establish release rules for new work into the factory, and set scheduling rules for…

  5. Project for qualification of the Kozloduy confinement system

    International Nuclear Information System (INIS)

    Montes Rodriguez, J.L.

    1993-01-01

    One of the projects awarded to Empresarios Agrupados within the Six-Month WANO Programme for Kozloduy NPP, financed through the European Community's PHARE Programme, relates to the first tasks of plant confinement system qualification. Development of this project - the results of which will serve as a reference for other power plants with VVER-440/230 models - aroused considerable interest in the Bulgarian nuclear community as well as in international entities which render assistance to Eastern power plants. In fact, this is one of the few projects in the programme which takes into account hardware-oriented activities to be carried out urgently in the plant. The VVER-440/230 confinement system performs functions parallel to the containment system of Western PWR reactors. However, it differs significantly in its criteria and operation details. These important differences form the basis for a rational and prudent application of the essence of Western codes and standards relating to the qualification of these systems. The criteria which are developed to make this application viable constitute the most challenging and, at the same time, most risky part of this job. The project will be in its final stages when the 18th Annual Meeting of the Spanish Nuclear Society is held; it is therefore likely that this paper will advance the results and conclusions expected. (author)

  6. Identification of linear error-models with projected dynamical systems

    Czech Academy of Sciences Publication Activity Database

    Krejčí, Pavel; Kuhnen, K.

    2004-01-01

    Roč. 10, č. 1 (2004), s. 59-91 ISSN 1387-3954 Keywords : identification * error models * projected dynamical systems Subject RIV: BA - General Mathematics Impact factor: 0.292, year: 2004 http://www.informaworld.com/smpp/content~db=all~content=a713682517

  7. Research notes : solar powered navigational lighting system demonstration project.

    Science.gov (United States)

    2011-04-01

    ODOT will be installing a solar powered navigational lighting system on the AstoriaMegler Bridge as part of a pilot project approved by the Federal Highways Administration (FHWA). The coastal bridge is the connection across the Columbia River on U.S....

  8. Volunteered Geographic Information System Design: Project and Participation Guidelines

    Directory of Open Access Journals (Sweden)

    José-Pablo Gómez-Barrón

    2016-07-01

    Full Text Available This article sets forth the early phases of a methodological proposal for designing and developing Volunteered Geographic Information (VGI initiatives based on a system perspective analysis in which the components depend and interact dynamically among each other. First, it focuses on those characteristics of VGI projects that present different goals and modes of organization, while using a crowdsourcing strategy to manage participants and contributions. Next, a tool is developed in order to design the central crowdsourced processing unit that is best suited for a specific project definition, associating it with a trend towards crowd-based or community-driven approaches. The design is structured around the characterization of different ways of participating, and the task cognitive demand of working on geo-information management, spatial problem solving and ideation, or knowledge acquisition. Then, the crowdsourcing process design helps to identify what kind of participants are needed and outline subsequent engagement strategies. This is based on an analysis of differences among volunteers’ participatory behaviors and the associated set of factors motivating them to contribute, whether on a crowd or community-sourced basis. From a VGI system perspective, this paper presents a set of guidelines and methodological steps in order to align project goals, processes and volunteers and thus successfully attract participation. This methodology helps establish the initial requirements for a VGI system, and, in its current state, it mainly focuses on two components of the system: project and participants.

  9. The Cronus Distributed DBMS (Database Management System) Project

    Science.gov (United States)

    1989-10-01

    projects, e.g., HiPAC [Dayal 88] and Postgres [Stonebraker 86]. Although we expect to use these techniques, they have been developed for centralized...Computing Systems, June 1989. (To appear). [Stonebraker 86] Stonebraker, M. and Rowe, L. A., "The Design of POSTGRES ," Proceedings ACM SIGMOD Annual

  10. Project ME: A Report on the Learning Wall System.

    Science.gov (United States)

    Heilig, Morton L.

    The learning wall system, which consists primarily of a special wall used instead of a screen for a variety of projection purposes, is described, shown diagrammatically, and pictured. Designed to provide visual perceptual motor training on a level that would fall between gross and fine motor performance for perceptually handicapped children, the…

  11. Collaborative Learning in Advanced Supply Systems: The KLASS Pilot Project.

    Science.gov (United States)

    Rhodes, Ed; Carter, Ruth

    2003-01-01

    The Knowledge and Learning in Advanced Supply Systems (KLASS) project developed collaborative learning networks of suppliers in the British automotive and aerospace industries. Methods included face-to-face and distance learning, work toward National Vocational Qualifications, and diagnostic workshops for senior managers on improving quality,…

  12. Development as an effective management system construction and investment projects

    Directory of Open Access Journals (Sweden)

    Beloborodov Roman S.

    2011-02-01

    Full Text Available The article presents the material of the application of the conception «Development» as the effective methodology of the investment-construction project management within the framework the systems approach. Theoretical principles of the application of this conception are generalized and systematized based on the example of the creation of the low habitable complex.

  13. Visualizing project management: models and frameworks for mastering complex systems

    National Research Council Canada - National Science Library

    Forsberg, Kevin; Mooz, Hal; Cotterman, Howard

    2005-01-01

    ...- and beyond that on parameters such as return on investment, market acceptance, or sustainability. Anyone who has lived with the space program, or any other hightech industrial product development, can immediately appreciate this acclaimed book. It addresses and "visualizes" the multidimensional interactions of project management and systems engineering i...

  14. THE zCOSMOS-SINFONI PROJECT. I. SAMPLE SELECTION AND NATURAL-SEEING OBSERVATIONS

    Energy Technology Data Exchange (ETDEWEB)

    Mancini, C.; Renzini, A. [INAF-OAPD, Osservatorio Astronomico di Padova, Vicolo Osservatorio 5, I-35122 Padova (Italy); Foerster Schreiber, N. M.; Hicks, E. K. S.; Genzel, R.; Tacconi, L.; Davies, R. [Max-Planck-Institut fuer Extraterrestrische Physik, Giessenbachstrasse, D-85748 Garching (Germany); Cresci, G. [Osservatorio Astrofisico di Arcetri (OAF), INAF-Firenze, Largo E. Fermi 5, I-50125 Firenze (Italy); Peng, Y.; Lilly, S.; Carollo, M.; Oesch, P. [Institute of Astronomy, Department of Physics, Eidgenossische Technische Hochschule, ETH Zurich CH-8093 (Switzerland); Vergani, D.; Pozzetti, L.; Zamorani, G. [INAF-Bologna, Via Ranzani, I-40127 Bologna (Italy); Daddi, E. [CEA-Saclay, DSM/DAPNIA/Service d' Astrophysique, F-91191 Gif-Sur Yvette Cedex (France); Maraston, C. [Institute of Cosmology and Gravitation, University of Portsmouth, Dennis Sciama Building, Burnaby Road, PO1 3HE Portsmouth (United Kingdom); McCracken, H. J. [IAP, 98bis bd Arago, F-75014 Paris (France); Bouche, N. [Department of Physics, University of California, Santa Barbara, CA 93106 (United States); Shapiro, K. [Aerospace Research Laboratories, Northrop Grumman Aerospace Systems, Redondo Beach, CA 90278 (United States); and others

    2011-12-10

    The zCOSMOS-SINFONI project is aimed at studying the physical and kinematical properties of a sample of massive z {approx} 1.4-2.5 star-forming galaxies, through SINFONI near-infrared integral field spectroscopy (IFS), combined with the multiwavelength information from the zCOSMOS (COSMOS) survey. The project is based on one hour of natural-seeing observations per target, and adaptive optics (AO) follow-up for a major part of the sample, which includes 30 galaxies selected from the zCOSMOS/VIMOS spectroscopic survey. This first paper presents the sample selection, and the global physical characterization of the target galaxies from multicolor photometry, i.e., star formation rate (SFR), stellar mass, age, etc. The H{alpha} integrated properties, such as, flux, velocity dispersion, and size, are derived from the natural-seeing observations, while the follow-up AO observations will be presented in the next paper of this series. Our sample appears to be well representative of star-forming galaxies at z {approx} 2, covering a wide range in mass and SFR. The H{alpha} integrated properties of the 25 H{alpha} detected galaxies are similar to those of other IFS samples at the same redshifts. Good agreement is found among the SFRs derived from H{alpha} luminosity and other diagnostic methods, provided the extinction affecting the H{alpha} luminosity is about twice that affecting the continuum. A preliminary kinematic analysis, based on the maximum observed velocity difference across the source and on the integrated velocity dispersion, indicates that the sample splits nearly 50-50 into rotation-dominated and velocity-dispersion-dominated galaxies, in good agreement with previous surveys.

  15. Tailoring Enterprise Systems Engineering Policy for Project Scale and Complexity

    Science.gov (United States)

    Cox, Renee I.; Thomas, L. Dale

    2014-01-01

    Space systems are characterized by varying degrees of scale and complexity. Accordingly, cost-effective implementation of systems engineering also varies depending on scale and complexity. Recognizing that systems engineering and integration happen everywhere and at all levels of a given system and that the life cycle is an integrated process necessary to mature a design, the National Aeronautic and Space Administration's (NASA's) Marshall Space Flight Center (MSFC) has developed a suite of customized implementation approaches based on project scale and complexity. While it may be argued that a top-level system engineering process is common to and indeed desirable across an enterprise for all space systems, implementation of that top-level process and the associated products developed as a result differ from system to system. The implementation approaches used for developing a scientific instrument necessarily differ from those used for a space station. .

  16. Aquaponics System - An EPS@ISEP 2014 Spring Project

    OpenAIRE

    Llauradó, Ana Mesas; Docherty, Arlene; Méry, Gwénaël; Sokolowska, Natalia; Keane, Sean; Duarte, Abel José; Malheiro, Benedita; Ribeiro, Maria Cristina; Ferreira, Fernando José; Silva, Manuel; Ferreira, Paulo; Guedes, Pedro

    2015-01-01

    The goal of this project, one of the proposals of the EPS@ISEP 2014 Spring, was to develop an Aquaponics System. Over recent years Aquaponics systems have received increased attention due to its possibilities in helping reduce strain on resources within 1st and 3rd world countries. Aquaponics is the combination of Hydroponics and Aquaculture and mimics a natural environment in order to successfully apply and enhance the understanding of natural cycles within an indoor pro...

  17. New Technologies in the Payment System Industries: The SEPA Project

    OpenAIRE

    Armando Calabrese; Massimo Gastaldi; Irene Iacovelli; Nathan L. Ghiron

    2010-01-01

    Problem statement: The Single Euro Payments Area (SEPA) project plans to establish an integrated market for extending European integration to retail payments; it aims to provide incentives for using payment systems instead of cash for all micro payments, in order to improve both efficiency and competition in the Euro area. In this study we described the SEPA and its effects on competition and innovation in the payment systems. Moreover, we will discuss the main technologic...

  18. F-15 837 IFCS Intelligent Flight Control System Project

    Science.gov (United States)

    Bosworth, John T.

    2007-01-01

    This viewgraph presentation reviews the use of Intelligent Flight Control System (IFCS) for the F-15. The goals of the project are: (1) Demonstrate Revolutionary Control Approaches that can Efficiently Optimize Aircraft Performance in both Normal and Failure Conditions (2) Advance Neural Network-Based Flight Control Technology for New Aerospace Systems Designs. The motivation for the development are to reduce the chance and skill required for survival.

  19. Energy Exascale Earth System Model (E3SM) Project Strategy

    Energy Technology Data Exchange (ETDEWEB)

    Bader, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-09-18

    The E3SM project will assert and maintain an international scientific leadership position in the development of Earth system and climate models at the leading edge of scientific knowledge and computational capabilities. With its collaborators, it will demonstrate its leadership by using these models to achieve the goal of designing, executing, and analyzing climate and Earth system simulations that address the most critical scientific questions for the nation and DOE.

  20. Selection of dominant radionuclides for Phase 1 of the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Napier, B.A.

    1991-07-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation dose that individuals could have received as a result of emissions from nuclear operations at Hanford since their inception in 1944. A vital step in the estimation of radiation doses is the determination of the source term,'' that is, the quantities of radionuclides that were released to the environment from the various Hanford operations. Hanford operations have at various times involved hundreds of different radionuclides, some in relatively large quantities. Those radionuclides present in the largest quantities, although significant from an operational handling point of view, may not necessarily have been those of greatest concern for offsite radiation dose. This report documents the selection of the dominant radionuclides (those that may have resulted in the largest portion of the received doses) in the source term for Phase 1 of the HEDR Project, that is, for atmospheric releases from 1944 through 1947 and for surface water releases from 1964 through 1966. 15 refs., 3 figs., 10 tabs.