WorldWideScience

Sample records for project selection system

  1. IT Project Selection

    DEFF Research Database (Denmark)

    Pedersen, Keld

    2016-01-01

    for initiation. Most of the research on project selection is normative, suggesting new methods, but available empirical studies indicate that many methods are seldom used in practice. This paper addresses the issue by providing increased understanding of IT project selection practice, thereby facilitating...... the development of methods that better fit current practice. The study is based on naturalistic decision-making theory and interviews with experienced project portfolio managers who, when selecting projects, primarily rely on political skills, experience and personal networks rather than on formal IT project......-selection methods, and these findings point to new areas for developing new methodological support for IT project selection....

  2. Hybrid Multicriteria Group Decision Making Method for Information System Project Selection Based on Intuitionistic Fuzzy Theory

    Directory of Open Access Journals (Sweden)

    Jian Guo

    2013-01-01

    Full Text Available Information system (IS project selection is of critical importance to every organization in dynamic competing environment. The aim of this paper is to develop a hybrid multicriteria group decision making approach based on intuitionistic fuzzy theory for IS project selection. The decision makers’ assessment information can be expressed in the form of real numbers, interval-valued numbers, linguistic variables, and intuitionistic fuzzy numbers (IFNs. All these evaluation pieces of information can be transformed to the form of IFNs. Intuitionistic fuzzy weighted averaging (IFWA operator is utilized to aggregate individual opinions of decision makers into a group opinion. Intuitionistic fuzzy entropy is used to obtain the entropy weights of the criteria. TOPSIS method combined with intuitionistic fuzzy set is proposed to select appropriate IS project in group decision making environment. Finally, a numerical example for information system projects selection is given to illustrate application of hybrid multi-criteria group decision making (MCGDM method based on intuitionistic fuzzy theory and TOPSIS method.

  3. PROJECT W-551 INTERIM PRETREATMENT SYSTEM TECHNOLOGY SELECTION SUMMARY DECISION REPORT AND RECOMMENDATION

    International Nuclear Information System (INIS)

    CONRAD EA

    2008-01-01

    This report provides the conclusions of the tank farm interim pretreatment technology decision process. It documents the methodology, data, and results of the selection of cross-flow filtration and ion exchange technologies for implementation in project W-551, Interim Pretreatment System. This selection resulted from the evaluation of specific scope criteria using quantitative and qualitative analyses, group workshops, and technical expert personnel

  4. Project Selection for NASA's R&D Programs

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of NASA s Research and Development (R&D) programs is to provide advanced human support technologies for the Exploration Systems Mission Directorate (ESMD). The new technologies must be sufficiently attractive and proven to be selectable for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are likely options for flight. The R&D programs must select an array of technology development projects, manage them, and either terminate or continue them, so as to maximize the delivered number of potentially usable advanced human support technologies. This paper proposes an effective project selection methodology to help manage NASA R&D project portfolios.

  5. Discriminative Projection Selection Based Face Image Hashing

    Science.gov (United States)

    Karabat, Cagatay; Erdogan, Hakan

    Face image hashing is an emerging method used in biometric verification systems. In this paper, we propose a novel face image hashing method based on a new technique called discriminative projection selection. We apply the Fisher criterion for selecting the rows of a random projection matrix in a user-dependent fashion. Moreover, another contribution of this paper is to employ a bimodal Gaussian mixture model at the quantization step. Our simulation results on three different databases demonstrate that the proposed method has superior performance in comparison to previously proposed random projection based methods.

  6. PROJECT W-551 DETERMINATION DATA FOR EARLY LAW INTERIM PRETREATMENT SYSTEM SELECTION

    Energy Technology Data Exchange (ETDEWEB)

    TEDESCHI AR

    2008-08-11

    This report provides the detailed assessment forms and data for selection of the solids separation and cesium separation technology for project W-551, Interim Pretreatment System. This project will provide early pretreated low activity waste feed to the Waste Treatment Plant to allow Waste Treatment Plan Low Activity Waste facility operation prior to construction completion of the Pretreatment and High Level Waste facilities. The candidate solids separations technologies are rotary microfiltration and crossflow filtration, and the candidate cesium separation technologies are fractional crystallization, caustic-side solvent extraction, and ion-exchange using spherical resorcinol-formaldehyde resin. This data was used to prepare a cross-cutting technology summary, reported in RPP-RPT-37740.

  7. Selecting users for participation in IT projects

    DEFF Research Database (Denmark)

    Rasmussen, Rasmus; Christensen, Anders S.; Fjeldsted, Tobias

    2011-01-01

    The selection of users for participation in IT projects involves trade-offs between multiple criteria, one of which is selecting a representative cross-section of users. This criterion is basic because trading it for other criteria means basing designs on information biased toward some user groups...... at the expense of others. Based on interviews in development and customer organizations we find that their criteria for user selection favour persons who can contribute to the progress of the IT project over persons who are representative of the full range of users. A highly valued contribution from...... participating users is the ability to advocate a vision for the system and champion its organizational implementation. A survey in one customer organization shows that respondents’ personal traits explain up to 31% of the variation in their experience of aspects of the usability of a recently introduced system...

  8. IDENTIFICATION AND SELECTION OF SIX SIGMA PROJECTS

    Directory of Open Access Journals (Sweden)

    Abdalhkeim FA. Flifel

    2017-04-01

    Full Text Available Six Sigma is a well-structured and proven methodology for improving organizational performance. It helps achieving the goals of the organization through the use of project-driven approach. The implementation of Six sigma approach depends on proper identification and selection of projects, moreover, the selection of right Six sigma projects is one of the critical success factors of six sigma efforts. The paper provides the sources for the identification of potential projects, top down and bottom up approaches, the process of selection of projects, guidelines that assist the selection of appropriate projects, selection criteria which must be precisely chosen in accordance with the objectives, needs and capabilities of the organization as well as sophisticated techniques and tools recommended in the literature for the selection of projects.

  9. PORTFOLIO SELECTION OF INFORMATION SYSTEMS PROJECTS USING PROMETHEE V WITH C-OPTIMAL CONCEPT

    Directory of Open Access Journals (Sweden)

    Jonatas A. de Almeida

    2014-05-01

    Full Text Available This paper presents a multicriteria decision model for selecting a portfolio of information system (IS projects, which integrates strategic and organizational view within a multicriteria decision structure. The PROMETHEE V method, based on outranking relations is applied, considering the c-optimal concept in order to overcome some scaling problems found in the classical PROMETHEE V approach. Then, a procedure is proposed in order to make a final analysis of the c-optimal portfolios found as a result of using PROMETHEE V. Also, the organizational view is discussed, including some factors that may influence decision making on IS projects to be included in the portfolio, such as adding the company's strategic vision and technical aspects that demonstrate how IS contributes value to a company's business.

  10. Project W-420 stack monitoring system upgrades

    International Nuclear Information System (INIS)

    CARPENTER, K.E.

    1999-01-01

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420

  11. Selecting a Sustainable Disinfection Technique for Wastewater Reuse Projects

    Directory of Open Access Journals (Sweden)

    Jorge Curiel-Esparza

    2014-09-01

    Full Text Available This paper presents an application of the Analytical Hierarchy Process (AHP by integrating a Delphi process for selecting the best sustainable disinfection technique for wastewater reuse projects. The proposed methodology provides project managers a tool to evaluate problems with multiple criteria and multiple alternatives which involve non-commeasurable decision criteria, with expert opinions playing a major role in the selection of these treatment technologies. Five disinfection techniques for wastewater reuse have been evaluated for each of the nine criteria weighted according to the opinions of consulted experts. Finally, the VIKOR method has been applied to determine a compromise solution, and to establish the stability of the results. Therefore, the expert system proposed to select the optimal disinfection alternative is a hybrid method combining the AHP with the Delphi method and the VIKOR technique, which is shown to be appropriate in realistic scenarios where multiple stakeholders are involved in the selection of a sustainable disinfection technique for wastewater reuse projects.

  12. Study on the Selection of Equipment Suppliers for Wind Power Generation EPC Project

    Science.gov (United States)

    Yang, Yuanyue; Li, Huimin

    2017-12-01

    In the EPC project, the purchase cost of equipments accounted for about 60% of the total project cost, thus, the selection of equipment suppliers has an important influence on the EPC project. This paper, took EPC project for the phase I engineering of Guizhou Huaxi Yunding wind power plant as research background, constructed the evaluation index system for the selection of equipment suppliers for wind power generation EPC project from multiple perspectives, and introduced matter-element extension evaluation model to evaluate the selection of equipment suppliers for this project from the qualitative and quantitative point of view. The result is consistent with the actual situation, which verifies the validity and operability of this method.

  13. Space Projects: Improvements Needed in Selecting Future Projects for Private Financing

    Science.gov (United States)

    1990-01-01

    The Office of Management and Budget (OMB) and NASA jointly selected seven projects for commercialization to reduce NASA's fiscal year 1990 budget request and to help achieve the goal of increasing private sector involvement in space. However, the efforts to privately finance these seven projects did not increase the commercial sector's involvement in space to the extent desired. The General Accounting Office (GAO) determined that the projects selected were not a fair test of the potential of increasing commercial investment in space at an acceptable cost to the government, primarily because the projects were not properly screened. That is, neither their suitability for commercialization nor the economic consequences of seeking private financing for them were adequately evaluated before selection. Evaluations and market tests done after selection showed that most of the projects were not viable candidates for private financing. GAO concluded that projects should not be removed from NASA's budget for commercial development until after careful screening has been done to determine whether adequate commercial demand exists, development risks are commercially acceptable and private financing is found or judged to be highly likely, and the cost effectiveness of such a decision is acceptable. Premature removal of projects from NASA's budget ultimately can cause project delays and increased costs when unsuccessful commercialization candidates must be returned to the budget. NASA also needs to ensure appropriate comparisons of government and private financing options for future commercialization projects.

  14. Procurement selection criteria for projects in the public sector: evidence from Nigeria

    Directory of Open Access Journals (Sweden)

    Richard Ajayi Jimoh

    2016-12-01

    Full Text Available The selection of suitable procurement practice for construction projects is a very complex and demanding tasks for stakeholders in the construction industry. In spite of the overabundance of techniques and tools accessible to the stakeholders in selecting an appropriate procurement method, clients are faced with the decision as to which of the selection criteria can be adopted for a given construction project to achieve project goals and objectives. This paper focused on evaluating the existing procurement methods being practised in the Nigerian construction industry with a view to identifying and establishing the parameters for selection that will improve contract delivery systems. In this research, quantitative approach was used to collect data from 420 contractors, consultants and clients based in the Federal Capital Territory, Abuja where large numbers of building projects are being procured. The findings revealed six most commonly considered criteria and deduced that, the quality, cost and duration of the project determines the type of procurement method to adopt. It is therefore stated that in selecting any particular procurement method for building construction projects, the complexity of such project should be clearly defined and the other performance indicators be given adequate consideration for a successful project delivery that will enhance the achievement of the client’s goal.

  15. 49 CFR 268.17 - Project selection criteria.

    Science.gov (United States)

    2010-10-01

    ... criteria will govern FRA's selection of projects to receive funding under the Maglev Deployment Program. (a... are to be expected in the United States. (4) The degree to which the project will augment a Maglev... development status of the Maglev technology selected by the applicant for the project. (c) Benefits for the...

  16. A fuzzy hybrid approach for project manager selection

    Directory of Open Access Journals (Sweden)

    Ahmad Jafarnejad Chaghooshi

    2016-09-01

    Full Text Available Suitable project manager has a significant impact on successful accomplishment of the project. Managers should possess such skills in order to effectively cope with the competition. In this respect, selecting managers based on their skills can lead to a competitive advantage towards the achievement of organizational goals. selection of the suitable project manager can be viewed as a multi-criteria decision making (MCDM problem and an extensive evaluation of criteria, such as Technical skills, experience skills, Personal qualities and the related criteria must be considered in the selection process of project manager. The fuzzy set theory and MCDM methods appears as an essential tools to provide a decision framework that incorporates imprecise judgments and multi criteria nature of project manager selection process inherent in this process. This paper proposes the joint use of the Fuzzy DEMATEL (FDEMATEL and Fuzzy VIKOR methods for the decision-making process of selecting the most suitable managers for projects. First, with the opinions of the senior managers based on project management competency model (ICB-IPMA, all the criteria required for the selection are gathered. Then the FDEMATEL method is used to prioritize the importance of various criteria and FVIKOR used to rank the alternatives in a preferred order to select the best project managers from a number of alternatives. Next, a real case study used to illustrate the process of the proposed method. Finally, some conclusions are discussed at the end of this study.

  17. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Down-selection of one or more Maglev projects for... Procedures For Financial Assistance § 268.21 Down-selection of one or more Maglev projects for further study... completion of Phase III of the Maglev Deployment Program, FRA will down-select one or more projects to...

  18. Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This Project Execution Plan documents the methodology for managing Project W-211. Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for the future waste treatment plant, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AN-102, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the River Protection Project (RF'P) Waste Treatment Facility and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump-based retrieval system for any DST. This Project Execution Plan (PEP), derived from the predecessor Project Management Plan, documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering

  19. The Added Value of the Project Selection Process

    Directory of Open Access Journals (Sweden)

    Adel Oueslati

    2016-06-01

    Full Text Available The project selection process comes in the first stage of the overall project management life cycle. It does have a very important impact on organization success. The present paper provides defi nitions of the basic concepts and tools related to the project selection process. It aims to stress the added value of this process for the entire organization success. The mastery of the project selection process is the right way for any organization to ensure that it will do the right project with the right resources at the right time and within the right priorities

  20. Selection of projects in the regional energy planning

    International Nuclear Information System (INIS)

    Ramirez P, R.; Navas M, F.

    1993-01-01

    The processes of regional energy planning have changed vastly in the last years and it will continue changing in the future for the new norm of the State. This work tries to show the use of systematic tools in the selection of regional energy projects. It discusses a methodology of selection of projects based on a multivariate technical. It is applied in the Southwestern region of Colombia and both selection and priority results are obtained. The designed methodology allows to make the selection of projects in an automatic way with a software designed for such an end. In the case of Southwestern it arrives to a briefcase of projects for an energy plan and made for other races

  1. Combinatorial Optimization in Project Selection Using Genetic Algorithm

    Science.gov (United States)

    Dewi, Sari; Sawaluddin

    2018-01-01

    This paper discusses the problem of project selection in the presence of two objective functions that maximize profit and minimize cost and the existence of some limitations is limited resources availability and time available so that there is need allocation of resources in each project. These resources are human resources, machine resources, raw material resources. This is treated as a consideration to not exceed the budget that has been determined. So that can be formulated mathematics for objective function (multi-objective) with boundaries that fulfilled. To assist the project selection process, a multi-objective combinatorial optimization approach is used to obtain an optimal solution for the selection of the right project. It then described a multi-objective method of genetic algorithm as one method of multi-objective combinatorial optimization approach to simplify the project selection process in a large scope.

  2. Application of Systems Engineering to U.S. Department of Energy Privatization Project Selection at the Hanford Nuclear Reservation

    International Nuclear Information System (INIS)

    Layman, John Scott

    1999-01-01

    The privatization efforts at the U.S. Department of Energy's Hanford Nuclear Reservation have been very successful primarily due to a disciplined process for project selection and execution. Early in the development of Privatization at Hanford, the Department of Energy determined that a disciplined alternatives generation and analysis (AGA) process would furnish the candidate projects with the best probability for success. Many factors had to be considered in the selection of projects. Westinghouse Hanford Company was assigned to develop this process and facilitate the selection of the first round of candidate privatization projects. Team members for the AGA process were assembled from all concerned organizations and skill groups. Among the selection criteria were legal, financial and technical considerations which had to be weighed

  3. PROJECT PORTFOLIO SELECTION COMPETENCES RESEARCH INUNIVERSITIES OF LITHUANIA

    OpenAIRE

    R #363;ta #268;iutien #279;; Evelina Meilien #279;; Bronius Neverauskas

    2011-01-01

    As a result of the theoretical findings, the paperdemonstrates that projectportfolio selection is crucial project management problem. Successful ProjectPortfolio management requires specific competences.Every project of projectportfolio must be evaluated according to the basedcriteria and parameters.Empirical study was based on framework matrix withfour parameters of projectportfolio selection and only two phases of projectportfolio formation. The r...

  4. River Protection Project information systems assessment

    International Nuclear Information System (INIS)

    JOHNSON, A.L.

    1999-01-01

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report

  5. Proposed Project Selection Method for Human Support Research and Technology Development (HSR&TD)

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of HSR&TD is to deliver human support technologies to the Exploration Systems Mission Directorate (ESMD) that will be selected for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are acceptable. HSR&TD must select an may of technology development projects, guide them, and either terminate or continue them, so as to maximize the resulting number of usable advanced human support technologies. This paper proposes an effective project scoring methodology to support managing the HSR&TD project portfolio. Researchers strongly disagree as to what are the best technology project selection methods, or even if there are any proven ones. Technology development is risky and outstanding achievements are rare and unpredictable. There is no simple formula for success. Organizations that are satisfied with their project selection approach typically use a mix of financial, strategic, and scoring methods in an open, established, explicit, formal process. This approach helps to build consensus and develop management insight. It encourages better project proposals by clarifying the desired project attributes. We propose a project scoring technique based on a method previously used in a federal laboratory and supported by recent research. Projects are ranked by their perceived relevance, risk, and return - a new 3 R's. Relevance is the degree to which the project objective supports the HSR&TD goal of developing usable advanced human support technologies. Risk is the estimated probability that the project will achieve its specific objective. Return is the reduction in mission life cycle cost obtained if the project is successful. If the project objective technology performs a new function with no current cost, its return is the estimated cash value of performing the new function. The proposed project selection scoring method includes definitions of the criteria, a project evaluation

  6. Selection of a portfolio of R & D projects

    NARCIS (Netherlands)

    Casault, Sébastien; Groen, Arend J.; Linton, J.D.; Linton, Jonathan; Link, A.N.; Vonortas, N.S.

    2013-01-01

    While portfolios of research are increasingly discussed, a portfolio perspective is infrequently taken when selecting two or more projects. Consequently, this chapter considers the current state of knowledge in project and portfolio selection, identifies why we can and cannot apply knowledge from

  7. ANP applied to electronics engineering project selection

    International Nuclear Information System (INIS)

    Habib, M.

    2010-01-01

    Project selection in Electronics engineering is a complex decision-making process. This research paper illustrates an application of ANP/AHP process. The AHP (Analytic Hierarchy Process) is employed to break down large unstructured decision problems into manageable and measureable components. The ANP, as the general form of AHP, is powerful to deal with complex decisions where interdependence exists in a decision model. The research paper discusses the use of the ANP, a general form of Saaty's analytic Network process, as a model to evaluate the value of competing Electronics projects. The research paper concludes with a case study describing the implementation of this model at an engineering college, including data based on the actual use of the decision making model. The case study helps to verify that AHP is an effective and efficient decision-making tool. A major contribution of this work is to provide a methodology for assessing the best project. Despite a number of publications applying AHP in project selection, this is probably the first time that an attempt has been made to apply AHP in an electronics project selection in an engineering university environment. (author)

  8. River Protection Project information systems assessment

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, A.L.

    1999-07-28

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report.

  9. Project Management Plan for Initial Tank Retrieval Systems, Project W-211

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    1999-01-01

    Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for future processing plants, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AP-108, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the Privatized waste processing plant and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump based retrieval system for any DST. This Project Management Plan (PMP) documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering

  10. METHOD FOR SELECTION OF PROJECT MANAGEMENT APPROACH BASED ON FUZZY CONCEPTS

    Directory of Open Access Journals (Sweden)

    Igor V. KONONENKO

    2017-03-01

    Full Text Available Literature analysis of works that devoted to research of the selection a project management approach and development of effective methods for this problem solution is given. Mathematical model and method for selection of project management approach with fuzzy concepts of applicability of existing approaches are proposed. The selection is made of such approaches as the PMBOK Guide, the ISO21500 standard, the PRINCE2 methodology, the SWEBOK Guide, agile methodologies Scrum, XP, and Kanban. The number of project parameters which have a great impact on the result of the selection and measure of their impact is determined. Project parameters relate to information about the project, team, communication, critical project risks. They include the number of people involved in the project, the customer's experience with this project team, the project team's experience in this field, the project team's understanding of requirements, adapting ability, initiative, and others. The suggested method is considered on the example of its application for selection a project management approach to software development project.

  11. Business System Planning Project, Alternatives Analysis

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    The CHG Chief Information Officer (CIO) requested a study of alternatives to the current business system computing environment. This Business Systems Planning (BSP) Project Alternatives Analysis document presents an analysis of the current Project Controls, Work Management, and Business Management systems environment and alternative solutions that support the business functions. The project team has collected requirements and priorities from stakeholders in each business area and documented them in the BSP System Requirements Specification (SRS), RPP-6297. The alternatives analysis process identifies and measures possible solutions in each of the business process areas against the requirements as documented in the SRS. The team gathered input from both internal and external sources to identify and grade the possible solutions. This document captures the results of that activity and recommends a suite of software products. This study was to select the best product based on how well the product met the requirements, not to determine the platform or hardware environment that would be used. Additional analysis documentation can be found in BSP project files

  12. Selecting Health Care Improvement Projects: A Methodology Integrating Cause-and-Effect Diagram and Analytical Hierarchy Process.

    Science.gov (United States)

    Testik, Özlem Müge; Shaygan, Amir; Dasdemir, Erdi; Soydan, Guray

    It is often vital to identify, prioritize, and select quality improvement projects in a hospital. Yet, a methodology, which utilizes experts' opinions with different points of view, is needed for better decision making. The proposed methodology utilizes the cause-and-effect diagram to identify improvement projects and construct a project hierarchy for a problem. The right improvement projects are then prioritized and selected using a weighting scheme of analytical hierarchy process by aggregating experts' opinions. An approach for collecting data from experts and a graphical display for summarizing the obtained information are also provided. The methodology is implemented for improving a hospital appointment system. The top-ranked 2 major project categories for improvements were identified to be system- and accessibility-related causes (45%) and capacity-related causes (28%), respectively. For each of the major project category, subprojects were then ranked for selecting the improvement needs. The methodology is useful in cases where an aggregate decision based on experts' opinions is expected. Some suggestions for practical implementations are provided.

  13. Combining AHP and DEA Methods for Selecting a Project Manager

    Directory of Open Access Journals (Sweden)

    Baruch Keren

    2014-07-01

    Full Text Available A project manager has a major influence on the success or failure of the project. A good project manager can match between the strategy and objectives of the organization and the goals of the project. Therefore, the selection of the appropriate project manager is a key factor for the success of the project. A potential project manager is judged by his or her proven performance and personal qualifications. This paper proposes a method to calculate the weighted scores and the full rank of candidates for managing a project, and to select the best of those candidates. The proposed method combines specific methodologies: the Data Envelopment Analysis (DEA and the Analytical Hierarchical Process (AHP and uses DEA Ranking Methods to enhance selection.

  14. Selecting downscaled climate projections for water resource impacts and adaptation

    Science.gov (United States)

    Vidal, Jean-Philippe; Hingray, Benoît

    2015-04-01

    variables - climate change signal in temporally and spatially integrated variables - has been carefully made with respect their relevance for water resource management. This work proposes a twofold assessment of this selection approach. First, a climate validation allows checking the selection response of more extreme climate variables critical for hydrological impacts as well as spatially distributed ones. Second, a hydrological validation allows checking the selection response of streamflow variables relevant for water resource management. Findings highlight that such validations may critically help preventing misinterpretations and misuses of impact model ensemble outputs for integrated adaptation purposes. This work is part of the GICC R2D2-2050 project (Risk, water Resources and sustainable Development of the Durance catchment in 2050) and the EU FP7 COMPLEX project (Knowledge Based Climate Mitigation Systems for a Low Carbon Economy). Christierson, B. v., Vidal, J.-P., & Wade, S. D. (2012) Using UKCP09 probabilistic climate information for UK water resource planning}. J. Hydrol., {424-425}, 48-67. doi: 10.1016/j.jhydrol.2011.12.020} Lafaysse, M.; Hingray, B.; Terray, L.; Mezghani, A. & Gailhard, J. (2014) Internal variability and model uncertainty components in future hydrometeorological projections: The Alpine Durance basin. Water Resour. Res., {50}, 3317-3341. doi: 10.1002/2013WR014897 Vidal, J.-P. & Hingray, B. (2014) A framework for identifying tailored subsets of climate projections for impact and adaptation studies. EGU2014-7851

  15. Generation IV and transmutation materials (GETMAT) project: First assessment of selected results

    International Nuclear Information System (INIS)

    Fazio, Concetta; Serrano, Marta; Gessi, Alessandro; Henry, Jean; Malerba, Lorenzo

    2015-01-01

    The Generation IV and Transmutation Material (GETMAT) project has been initiated within the 7. EURATOM framework programme with the objective to support the development of innovative reactor designs. Emphasis has been put on the investigation, both in the theoretical and experimental domains, of selected material properties that are cross-cutting among the various Generation IV and Transmutation systems. The selection of the properties to be investigated has been performed by identifying relevant conditions of key components as cores and primary systems. Moreover, taking into account the envisaged conditions of these components it turned out that innovative materials might be a better choice with respect to conventional nuclear grade steels. Therefore, ODS alloys and 9-12 Cr Ferritic/Martensitic (F/M) steels have been selected as reference for the GETMAT project. The R and D activities have been focused on basic characterisation of ODS alloys produced ad hoc for the project and on an extensive PIE programme of F/M steels irradiated in previous programmes. Finally, first principle modelling studies to explain irradiation hardening and embrittlement of F/M alloys were an additional important task. The objective of this manuscript is to make a first assessment of the results obtained within GETMAT. (authors)

  16. Comparison and selection of off-grid PV systems

    Science.gov (United States)

    Izmailov, Andrey Yu.; Lobachevsky, Yakov P.; Shepovalova, Olga V.

    2018-05-01

    This work deals with comparison, evaluation and selection of PV systems of the same type based on their technical parameters either indicated in their technical specifications or calculated ones. Stand-alone and grid backed up photoelectric systems have been considered. General requirements for photoelectric system selection and evaluation have been presented that ensure system operability and required efficiency in operation conditions. Generic principles and definition of photoelectric systems characteristics have been considered. The described method is mainly targeted at PV engineering personnel and private customers purchasing PV systems. It can be also applied in the course of project contests, tenders, etc.

  17. SELECTING WORKING TEAMS FOR INFORMATION TECHNOLOGY OUTSOURCING PROJECTS THROUGH A COMBINATION OF METHODOLOGIES

    Directory of Open Access Journals (Sweden)

    María Alejandra Castellini

    Full Text Available ABSTRACT This paper deals with a problem that Information Technology outsourcing suppliers generally face when selecting a working team technically capable for specific roles in software development projects. A combination of methodologies, interactively integrated, is proposed. They are Soft System Methodology to structure the problem, Repertory Grid for individual interviews and elicitation of the selection criteria, DRV Processes to assess the candidates and to generate knowledge and consensus on the selection process and Linear Programming to assign people to each position. This multimethodology allowed finding a more comprehensive solution than that initially requested by the company, since it helped to establish the necessary transformations for the selection model to operate in the right way, set the competencies to be considered as selection criteria, develop a consensus estimate of the weighted criteria, and award global values to candidates, optimizing the assignment of roles in the group for the project.

  18. Review of selected contributions of the conference 'Project control in quality management systems'

    International Nuclear Information System (INIS)

    2008-04-01

    There were 12 contributions presented of the conference focused on the project management in quality management systems. Contributions were focused both on theoretical problems from the project management area and on the applications in practice in management systems implementation in accordance with the standards: STN EN ISO 9001:2000, STN EN ISO 14 001:2005, and OHSAS 18 001:1999. One contribution was focused on the project management in the project of preparation of finishing of the building of the Nuclear Power Plant Mochovce of 3. and 4. block and one contribution was focused on the amendment of the Atomic Act or on the preparation of the new Atomic Act with regard to duty of transposition of the Directive of the Council 2006/117/Euratom on control and supervision of the overseas transportations of radioactive waste and nuclear fuel burnt-up into legislation of the Slovak Republic

  19. Selection of procurement systems in the South African construction industry: An exploratory study

    Directory of Open Access Journals (Sweden)

    W. D. Thwala

    2012-12-01

    Full Text Available Purpose of this paper: Procurement systems are vital in ensuring the successful implementation of construction projects precisely in all the phases of any particular project. Therefore, this paper aims to investigate in a systematic manner the factors that influence the selection of a procurement system in the South African construction industry. Research methodology: An extensive theory and literature review of procurement systems was conducted. The literature reviewed included a sample of case studies of procurement systems successfully implemented in completed building and civil engineering projects in South Africa. A questionnaire using a four-round Delphi survey method was used to conduct the empirical study in order to obtain participants' opinions about factors influencing the selection of procurement systems as well as the utility value of various procurement systems on each factor as identified. Finally, data analysis of both qualitative and quantitative techniques was performed using the Statistical Package for Social Sciences (SPSS. Findings: After qualitative analysis, findings of the literature reviewed suggest that factors that influence the selection of procurement systems cut across all the phases of the project as identified in this paper. Therefore, these factors are categorically classified into internal and external factors. Factors from the internal environment were further classified into client characteristics and project characteristics, with client characteristics comprising of variables such as clients' level of knowledge and control, political and social consideration, familiarity of procurement systems, competition, funding arrangement, government public/private sector projects and risk allocation whereas project characteristics comprise of factors (variables such as size and technical complexity of the project, influence of the project life cycle, expedited project delivery, time, quality and price certainty. Factors

  20. Understanding the selection processes of public research projects

    NARCIS (Netherlands)

    Materia, V.C.; Pascucci, S.; Kolympiris, C.

    2015-01-01

    This paper analyses factors that affect the funding of agricultural research projects by regional governments and other regional public authorities. We study the selection process of agricultural research projects funded by the emilia Romagna regional government in Italy, which follows funding

  1. Six Sigma Project Selection Using Fuzzy TOPSIS Decision Making Approach

    Directory of Open Access Journals (Sweden)

    Rajeev Rathi

    2015-05-01

    Full Text Available Six Sigma is considered as a logical business strategy that attempts to identify and eliminate the defects or failures for improving the quality of product and processes. A decision on project selection in Six Sigma is always very critical; it plays a key role in successful implementation of Six Sigma. Selection of a right Six Sigma project is essentially important for an automotive company because it greatly influences the manufacturing costs. This paper discusses an approach for right Six Sigma project selection at an automotive industry using fuzzy logic based TOPSIS method. The fuzzy TOPSIS is a well recognized tool to undertake the fuzziness of the data involved in choosing the right preferences. In this context, evaluation criteria have been designed for selection of best alternative. The weights of evaluation criteria are calculated by using the MDL (modified digital logic method and final ranking is calculated through priority index obtained by using fuzzy TOPSIS method. In the selected case study, this approach has rightly helped to identify the right project for implementing Six Sigma for achieving improvement in productivity.

  2. METHODS OF SELECTING THE EFFECTIVE MODELS OF BUILDINGS REPROFILING PROJECTS

    Directory of Open Access Journals (Sweden)

    Александр Иванович МЕНЕЙЛЮК

    2016-02-01

    Full Text Available The article highlights the important task of project management in reprofiling of buildings. It is expedient to pay attention to selecting effective engineering solutions to reduce the duration and cost reduction at the project management in the construction industry. This article presents a methodology for the selection of efficient organizational and technical solutions for the reconstruction of buildings reprofiling. The method is based on a compilation of project variants in the program Microsoft Project and experimental statistical analysis using the program COMPEX. The introduction of this technique in the realigning of buildings allows choosing efficient models of projects, depending on the given constraints. Also, this technique can be used for various construction projects.

  3. [A Method for Selecting Self-Adoptive Chromaticity of the Projected Markers].

    Science.gov (United States)

    Zhao, Shou-bo; Zhang, Fu-min; Qu, Xing-hua; Zheng, Shi-wei; Chen, Zhe

    2015-04-01

    The authors designed a self-adaptive projection system which is composed of color camera, projector and PC. In detail, digital micro-mirror device (DMD) as a spatial light modulator for the projector was introduced in the optical path to modulate the illuminant spectrum based on red, green and blue light emitting diodes (LED). However, the color visibility of active markers is affected by the screen which has unknown reflective spectrum as well. Here active markers are projected spot array. And chromaticity feature of markers is sometimes submerged in similar spectral screen. In order to enhance the color visibility of active markers relative to screen, a method for selecting self-adaptive chromaticity of the projected markers in 3D scanning metrology is described. Color camera with 3 channels limits the accuracy of device characterization. For achieving interconversion of device-independent color space and device-dependent color space, high-dimensional linear model of reflective spectrum was built. Prior training samples provide additional constraints to yield high-dimensional linear model with more than three degrees of freedom. Meanwhile, spectral power distribution of ambient light was estimated. Subsequently, markers' chromaticity in CIE color spaces was selected via maximization principle of Euclidean distance. The setting values of RGB were easily estimated via inverse transform. Finally, we implemented a typical experiment to show the performance of the proposed approach. An 24 Munsell Color Checker was used as projective screen. Color difference in the chromaticity coordinates between the active marker and the color patch was utilized to evaluate the color visibility of active markers relative to the screen. The result comparison between self-adaptive projection system and traditional diode-laser light projector was listed and discussed to highlight advantage of our proposed method.

  4. A Methodology for Collective Evaluation and Selection of Industrial R&D Projects

    OpenAIRE

    Muhittin Oral; Ossama Kettani; Pascal Lang

    1991-01-01

    This paper proposes a methodology for evaluating and selecting R&D projects in a collective decision setting, especially useful at sectorial and national levels. It consists of two major phases: Evaluation and Selection. The evaluation process repeatedly uses mathematical programming models to determine the "relative values" of a given R&D project from the viewpoint of the other R&D projects. The selection process of R&D projects is based on these "relative values" and is done through a model...

  5. ERP systems selection in multinational enterprises: a practical guide

    Directory of Open Access Journals (Sweden)

    Moutaz Haddara

    2018-01-01

    Full Text Available The Enterprise Resource Planning (ERP system selection is an early phase in the ERP adoption process. When organizations evaluate an ERP, they commonly develop their own selection criteria that usually involve various system and vendor related factors. While the selection process is critical, however, there is an apparent research gap in literature. The ERP selection effort also focuses on the system’s fit with the organizational requirements and needs. Thus, the selection phase is critical, because if an organization chooses an unfit ERP, the whole project could be predestined to fail. This research provides an overview of an ERP selection process at an overseas branch office of a multinational company. The process employed a simple multi-attribute rating technique (SMART for evaluation. In addition, this research presents how cross-border data protection laws between the parent company and its branch have influenced the selection process. As the ERP system has been implemented successfully, the method and the selection factors have been proven adequate for the selection process.

  6. Project governance: selected South African government experiments

    Directory of Open Access Journals (Sweden)

    G. van der Walt

    2008-07-01

    Full Text Available Some form of accountability and power structure binds all organisations. Such structures are typically referred to as the “governance” structure of the organisation. In organisations that have relatively mature project applications and methodologies in place, governance mechanisms are established on more permanent bases. With its focus on performance, results and outcomes, project governance establishes decision-making structures, as well as accountability and responsibility mechanisms in public institutions to oversee projects. As government institutions increasingly place emphasis on project applications for policy implementation and service delivery initiatives, mechanisms or structures should be established to facilitate clear interfaces between the permanent organisation and the temporary project organisation. Such mechanisms or structures should enhance the governance of projects, that is, the strategic alignment of projects, the decentralisation of decision- making powers, rapid resource allocation, and the participation of external stakeholders. The purpose of this article is to explore the concept “project governance”, and to highlight examples of project governance as applied in selected government departments in provincial and national spheres. This would enable the establishment of best practice examples and assist to develop benchmarks for effective project applications for service delivery improvement.

  7. Survey of on-road image projection with pixel light systems

    Science.gov (United States)

    Rizvi, Sadiq; Knöchelmann, Marvin; Ley, Peer-Phillip; Lachmayer, Roland

    2017-12-01

    HID, LED and laser-based high resolution automotive headlamps, as of late known as `pixel light systems', are at the forefront of the developing technologies paving the way for autonomous driving. In addition to light distribution capabilities that outperform Adaptive Front Lighting and Matrix Beam systems, pixel light systems provide the possibility of image projection directly onto the street. The underlying objective is to improve the driving experience, in any given scenario, in terms of safety, comfort and interaction for all road users. The focus of this work is to conduct a short survey on this state-of-the-art image projection functionality. A holistic research regarding the image projection functionality can be divided into three major categories: scenario selection, technological development and evaluation design. Consequently, the work presented in this paper is divided into three short studies. Section 1 provides a brief introduction to pixel light systems and a justification for the approach adopted for this study. Section 2 deals with the selection of scenarios (and driving maneuvers) where image projection can play a critical role. Section 3 discusses high power LED and LED array based prototypes that are currently under development. Section 4 demonstrates results from an experiment conducted to evaluate the illuminance of an image space projected using a pixel light system prototype developed at the Institute of Product Development (IPeG). Findings from this work can help to identify and advance future research work relating to: further development of pixel light systems, scenario planning, examination of optimal light sources, behavioral response studies etc.

  8. Project Management of a personnel radiation records computer system

    International Nuclear Information System (INIS)

    Labenski, T.

    1984-01-01

    Project Management techniques have been used to develop a data base management information system to provide storage and retrieval of personnel radiation and Health Physics records. The system is currently being developed on a Hewlett Packard 1000 Series E Computer with provisions to include plant radiation survey information, radiation work permit information, inventory management for Health Physics supplies and instrumentation, and control of personnel access to radiological controlled areas. The methodologies used to manage the overall project are presented along with selection and management of software vendors

  9. Artificial neural network decision support systems for new product development project selection

    NARCIS (Netherlands)

    Thieme, R.J.; Song, Michael; Calantone, R.J.

    2000-01-01

    The authors extend and develop an artificial neural network decision support system and demonstrate how it can guide managers when they make complex new product development decisions. The authors use data from 612 projects to compare this new method with traditional methods for predicting various

  10. A CONCEPTUAL MODEL FOR IMPROVED PROJECT SELECTION AND PRIORITISATION

    Directory of Open Access Journals (Sweden)

    P. J. Viljoen

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: Project portfolio management processes are often designed and operated as a series of stages (or project phases and gates. However, the flow of such a process is often slow, characterised by queues waiting for a gate decision and by repeated work from previous stages waiting for additional information or for re-processing. In this paper the authors propose a conceptual model that applies supply chain and constraint management principles to the project portfolio management process. An advantage of the proposed model is that it provides the ability to select and prioritise projects without undue changes to project schedules. This should result in faster flow through the system.

    AFRIKAANSE OPSOMMING: Prosesse om portefeuljes van projekte te bestuur word normaalweg ontwerp en bedryf as ’n reeks fases en hekke. Die vloei deur so ’n proses is dikwels stadig en word gekenmerk deur toue wat wag vir besluite by die hekke en ook deur herwerk van vorige fases wat wag vir verdere inligting of vir herprosessering. In hierdie artikel word ‘n konseptuele model voorgestel. Die model berus op die beginsels van voorsieningskettings sowel as van beperkingsbestuur, en bied die voordeel dat projekte geselekteer en geprioritiseer kan word sonder onnodige veranderinge aan projekskedules. Dit behoort te lei tot versnelde vloei deur die stelsel.

  11. An analysis of project selection and assignment criteria of Danish tenders in Europe

    Directory of Open Access Journals (Sweden)

    Jasper Kranker Larsen

    2013-12-01

    Full Text Available Public construction agencies are one of the largest developers within the Danish construction industry, where such agencies own and develop new public construction projects. Most of these projects are put out in European tender. This study analyses the selection and assignment criteria employed by these agencies in different types of public sector projects. Some of the objectives pursued by the study include the determination of 1/ the selection and assignment criteria mostly used in Danish public tenders 2/ how different types of projects use selection and assignment criteria in the bidding process, and 3/ any significant difference between the use of selection and assignment criteria in Danish public construction projects. The study uses a quantitative research approach where 157 Danish public tender cases were selected from the European Tenders Electronic Daily database between the period: January 2010 to March 2013. Fisher's Exact Test was conducted to determine if there was any significant use of some selection and assignment criteria. The findings of the study showed that invited tenders with pre-qualification and lowest price in 69.8% of the tenders are the most used selection and assignment criteria, with little regard to project type.

  12. Selecting personnel to work on the interactive graphics system

    International Nuclear Information System (INIS)

    Norton, F.J.

    1979-01-01

    The paper established criteria for the selection of personnel to work on the interactive graphics system and mentions some of human behavioral patterns that are created by the implementation of graphic systems. Some of the social and educational problems associated with the interactive graphics system will be discussed. The project also provided for collecting objective data which would be useful in assessing the benefits of interactive graphics systems

  13. Selecting personnel to work on the interactive graphics system

    Energy Technology Data Exchange (ETDEWEB)

    Norton, F.J.

    1979-11-30

    The paper established criteria for the selection of personnel to work on the interactive graphics system and mentions some of human behavioral patterns that are created by the implementation of graphic systems. Some of the social and educational problems associated with the interactive graphics system will be discussed. The project also provided for collecting objective data which would be useful in assessing the benefits of interactive graphics systems.

  14. Designing and conducting health system research projects, volume ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    These 'green modules'* found their way to Malaysia, where Indra ..... They determine nutritional and hygiene practices, alert children to dangers, provide care in ... money from taxes and donor agencies to finance the health care system. .... The principle of cost-effectiveness is important in the selection of research projects.

  15. Applying a Hybrid MCDM Model for Six Sigma Project Selection

    Directory of Open Access Journals (Sweden)

    Fu-Kwun Wang

    2014-01-01

    Full Text Available Six Sigma is a project-driven methodology; the projects that provide the maximum financial benefits and other impacts to the organization must be prioritized. Project selection (PS is a type of multiple criteria decision making (MCDM problem. In this study, we present a hybrid MCDM model combining the decision-making trial and evaluation laboratory (DEMATEL technique, analytic network process (ANP, and the VIKOR method to evaluate and improve Six Sigma projects for reducing performance gaps in each criterion and dimension. We consider the film printing industry of Taiwan as an empirical case. The results show that our study not only can use the best project selection, but can also be used to analyze the gaps between existing performance values and aspiration levels for improving the gaps in each dimension and criterion based on the influential network relation map.

  16. A model for strategic selection of feeder management systems: A case study

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Hsing Hung [Faculty of Management and Administration, Macau University of Science and Technology, Avenue Wei Long, Taipa, Macau (China); Lee, Amy H.I. [Department of Industrial Management, Chung Hua University, No. 707, Sec. 2, Wu Fu Rd., Hsinchu 300 (China); Kang, He-Yau [Department of Industrial Engineering and Management, National Chin-Yi University of Technology, 35, Lane 215, Sec. 1, Chung San Rd., Taiping, Taichung 411 (China)

    2010-06-15

    The move to integrating distribution management system (DMS) and feeder management system (FMS) in China is becoming the main trend in recent years, in addition to upgrading and rebuilding existing energy management system (EMS) and DMS. However, with increasing complexity in the social environments along with rapidly changing technologies, how to select a suitable contractor and a FMS project is becoming an important issue for electric power companies. This paper first briefly introduces FMS and then lists its critical success criteria. A model that applies a multi-criteria decision-making (MCDM) method, an analytic network process (ANP) associated with benefits, opportunities, costs and risks (BOCR), is constructed to help power companies to select the most suitable FMS project. (author)

  17. Project Delivery System Mode Decision Based on Uncertain AHP and Fuzzy Sets

    Science.gov (United States)

    Kaishan, Liu; Huimin, Li

    2017-12-01

    The project delivery system mode determines the contract pricing type, project management mode and the risk allocation among all participants. Different project delivery system modes have different characteristics and applicable scope. For the owners, the selection of the delivery mode is the key point to decide whether the project can achieve the expected benefits, it relates to the success or failure of project construction. Under the precondition of comprehensively considering the influence factors of the delivery mode, the model of project delivery system mode decision was set up on the basis of uncertain AHP and fuzzy sets, which can well consider the uncertainty and fuzziness when conducting the index evaluation and weight confirmation, so as to rapidly and effectively identify the most suitable delivery mode according to project characteristics. The effectiveness of the model has been verified via the actual case analysis in order to provide reference for the construction project delivery system mode.

  18. Bug tracking and project management system application in an electronic design company

    Directory of Open Access Journals (Sweden)

    Sadık ARSLAN

    2016-05-01

    Full Text Available In this study, commercially available Bug Tracking and Management Information Systems has been investigated in a comprehensive manner. The systems that commonly used described in detail. Bug Tracking and Project Management Systems requirements analysis of medium-sized companies and Kentkart Ege Electronic which is an Information Technology company has been made. Obtained by the analysis requirements, the appropriate tools are selected for system application. JIRA that a product of Atlassian company was determined as a Bug Tracking and Project Management application tool. In this study, JIRA system adapted to the requirements, Bug Tracking and Project Management systems is designed in a structure which can be easily used by R&D employees. Cost-Benefit analysis is done and using this project was determined to be quite useful.

  19. Project Specific Quality Assurance Plan Project (QAPP) W-211 Initial Tank Retrieval Systems (ITRS)

    International Nuclear Information System (INIS)

    HALL, L.R.

    2000-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Project Hanford Quality Assurance Program is implemented by CH2M HILL Hanford Group Inc (CHG) for managing the Initial Tank Retrieval Systems (ITRS), Project W-211. This QAPP is responsive to the CHG Quality Assurance Program Description (QAPD) (LMH-MP-599) which provides direction for compliance to 10 CFR 830 120, ''Nuclear Safety Management, Quality Assurance Requirements'', and DOE Order 5700 6C, ''Quality Assurance'' Project W-211 modifies existing facilities and provides systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for future processing plants, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. This project includes the design, procurement, construction, startup and turnover of these retrieval systems This QAPP identifies organizational structures and responsibilities. Implementing procedures used by CHG project management can be found in the CHG Quality Assurance Program (CHG QAP) Implementation Matrix located in HNF-IP-0842, Volume XI, Attachment Proposed verification and inspection activities for critical items within the scope of project W-211 are identified in Attachment 1 W-211. Project participants will identify the implementing procedures used by their organization within their QAF'Ps. This project specific QAPP is used to identify requirements in addition to the QAPD and provide, by reference, additional information to other project documents

  20. RISK MANAGEMENT IN A LARGE-SCALE NEW RAILWAY TRANSPORT SYSTEM PROJECT

    Directory of Open Access Journals (Sweden)

    Sunduck D. SUH, Ph.D., P.E.

    2000-01-01

    Full Text Available Risk management experiences of the Korean Seoul-Pusan high-speed railway (KTX project since the planning stage are evaluated. One can clearly see the interplay of engineering and construction risks, financial risks and political risks in the development of the KTX project, which is the peculiarity of large-scale new railway system projects. A brief description on evaluation methodology and overview of the project is followed by detailed evaluations on key differences in risks between conventional railway system and high-speed railway system, social and political risks, engineering and construction risks, and financial risks. Risks involved in system procurement process, such as proposal solicitation, evaluation, selection, and scope of solicitation are separated out and evaluated in depth. Detailed events resulting from these issues are discussed along with their possible impact on system risk. Lessons learned and further possible refinements are also discussed.

  1. Unigrace - A Project For The Unification of Gravity Systems In Central Europe

    Science.gov (United States)

    Richter, B.; Falk, R.; Erker, E.; Ruess, D.; Mäkinen, J.; Hinderer, J.; Marson, I.; Sledzinski, J.

    Because of the present trends of political and economical unification in Europe for- merly classified gravimetric data in Central Europe are becoming available. The dif- ferences, however, between gravity systems in this area are so large that they strongly affect the geoid, vertical datum definitions and height systems. It is therefore manda- tory to study system differences and to unify them. The project UNIGRACE aims at solving this problem by carrying out absolute grav- ity measurements with the most advanced technology at 17 selected sites in the coun- tries concerned. In a joint effort five European groups from Austria, Finland, France, Germany, Italy and Poland using their absolute gravimeters and partners from Bul- garia, Croatia, Czech Republic, Hungary, Romania, Slovakia and Slovenia cooperate in selecting and/or establishing the sites and performing the measurements as well as in connecting the absolute sites to the national gravimetric networks. As a result, a unique gravity system in Central Europe will be available. The project started on Jan. 1, 1998 and till the end of 2000 all selected gravity sites have been observed twice by absolute gravimeters. From these repeated measurements the final results for this project will be presented which was granted by the European Commission.

  2. Site selection for controversial projects: reflections on the MRS experience

    International Nuclear Information System (INIS)

    Sigmon, E.B.; Marland, G.

    1987-01-01

    Projects for waste management, power production, and a host of other socially useful functions frequently falter because of local opposition. Students of the siting dilemma have prescribed accommodation of local interests through negotiation and compensation, but they offer little advice on the site selection itself. The negotiated compensation approach to siting frequently fails because localities refuse to negotiate. The authors argue that methods of site selection and developers' initial stance toward local communities affect communities' propensity to negotiate. Site selection strategies and their influence on project acceptability are examined, using the Department of Energy's Monitored Retrievable Storage proposal as a point of departure. 14 refs

  3. Lab-Scale CO2 Capture Studies and Selection of most Promising Sorbent. CAPHIGAS Project Tasks Report. Years 2010-2011

    International Nuclear Information System (INIS)

    Marano, M.; Torreiro, Y.

    2012-01-01

    In this report the main activities carried out within the CAPHIGAS Project, ref. ENE2009-08002 financed by the Spanish Ministry of Science and Innovation for the first two years are reported. The aim of the project is the development of a hybrid system WGS-adsorbent-membrane for the separation of CO 2 with H 2 production and this report summarises the most relevant results obtained on tasks L-1 and L-2 which refer to the selection, characterisation and study at laboratory scale of different sorbent materials to select those more promising for the hybrid system proposed. (Author) 55 refs.

  4. Evaluation and selection of decision-making methods to assess landfill mining projects.

    Science.gov (United States)

    Hermann, Robert; Baumgartner, Rupert J; Vorbach, Stefan; Ragossnig, Arne; Pomberger, Roland

    2015-09-01

    For the first time in Austria, fundamental technological and economic studies on recovering secondary raw materials from large landfills have been carried out, based on the 'LAMIS - Landfill Mining Austria' pilot project. A main focus of the research - and the subject of this article - was to develop an assessment or decision-making procedure that allows landfill owners to thoroughly examine the feasibility of a landfill mining project in advance. Currently there are no standard procedures that would sufficiently cover all the multiple-criteria requirements. The basic structure of the multiple attribute decision making process was used to narrow down on selection, conceptual design and assessment of suitable procedures. Along with a breakdown into preliminary and main assessment, the entire foundation required was created, such as definitions of requirements to an assessment method, selection and accurate description of the various assessment criteria and classification of the target system for the present 'landfill mining' vs. 'retaining the landfill in after-care' decision-making problem. Based on these studies, cost-utility analysis and the analytical-hierarchy process were selected from the range of multiple attribute decision-making procedures and examined in detail. Overall, both methods have their pros and cons with regard to their use for assessing landfill mining projects. Merging these methods or connecting them with single-criteria decision-making methods (like the net present value method) may turn out to be reasonable and constitute an appropriate assessment method. © The Author(s) 2015.

  5. Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem Erzaij

    2016-06-01

    Full Text Available Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public and private companies in Iraqi construction sector were employed to identify main criteria and sub criteria for supplier selection and their priorities.The main criteria identified were quality of product, commercial aspect, delivery, reputation and position, and system quality . An effective technique in multiple criteria decision making (MCDM as analytical hierarchy process (AHP have been used to get importance weights of criteria based on experts judgment. Thereafter, a management software system for Evaluation and Selection of Engineering Equipment Suppliers (ESEES has been developed based on the results obtained from AHP. This model was validated in a case study at municipality of Baghdad involved actual cases of selection pumps suppliers for infrastructure projects .According to experts, this model can improve the current process followed in the supplier selection and aid decision makers to adopt better choices in the domain of selection engineering equipment suppliers.

  6. Strategic project selection based on evidential reasoning approach for high-end equipment manufacturing industry

    Directory of Open Access Journals (Sweden)

    Lu Guangyan

    2017-01-01

    Full Text Available With the rapid development of science and technology, emerging information technologies have significantly changed the daily life of people. In such context, strategic project selection for high-end equipment manufacturing industries faces more and more complexities and uncertainties with the consideration of several complex criteria. For example, a group of experts rather than a single expert should be invited to select strategic project for high-end equipment manufacturing industries and the experts may feel difficulty to express their preferences towards different strategic projects due to their limited cognitive capabilities. In order to handle these complexities and uncertainties, the criteria framework of strategic project selection is firstly constructed based on the characteristics of high-end equipment manufacturing industries and then evidential reasoning (ER approach is introduced in this paper to help experts express their uncertain preferences and aggregate these preferences to generate an appropriate strategic project. A real case of strategic project selection in a high-speed train manufacturing enterprise is investigated to demonstrate the validity of the ER approach in solving strategic project selection problem.

  7. Selection of executors for realization of individual tasks of the project

    Directory of Open Access Journals (Sweden)

    Asanov Askhat

    2017-01-01

    Full Text Available This article deals with the task of selection of executors for the realization of individual tasks of a new project. A short review of approaches to the estimation of personnel based on intellectual methods is provided. Two approaches to the task solution of executors’ selection are reviewed. The first approach allows considering estimation of competence of potential executors and data about projects that have already been realized. These data and requirements to the tasks of new projects are presented with the help of cognitive map with correspondent vertices. In the article, a methodologic example of the suggested approach use is introduced. The second approach suggests the use of Hopfield’s neural network. Neural networks allow using the already available experience of project activities during realization of new projects.

  8. Project delivery system (PDS)

    CERN Document Server

    2001-01-01

    As business environments become increasingly competitive, companies seek more comprehensive solutions to the delivery of their projects. "Project Delivery System: Fourth Edition" describes the process-driven project delivery systems which incorporates the best practices from Total Quality and is aligned with the Project Management Institute and ISO Quality Standards is the means by which projects are consistently and efficiently planned, executed and completed to the satisfaction of clients and customers.

  9. A Multiagent Evolutionary Algorithm for the Resource-Constrained Project Portfolio Selection and Scheduling Problem

    Directory of Open Access Journals (Sweden)

    Yongyi Shou

    2014-01-01

    Full Text Available A multiagent evolutionary algorithm is proposed to solve the resource-constrained project portfolio selection and scheduling problem. The proposed algorithm has a dual level structure. In the upper level a set of agents make decisions to select appropriate project portfolios. Each agent selects its project portfolio independently. The neighborhood competition operator and self-learning operator are designed to improve the agent’s energy, that is, the portfolio profit. In the lower level the selected projects are scheduled simultaneously and completion times are computed to estimate the expected portfolio profit. A priority rule-based heuristic is used by each agent to solve the multiproject scheduling problem. A set of instances were generated systematically from the widely used Patterson set. Computational experiments confirmed that the proposed evolutionary algorithm is effective for the resource-constrained project portfolio selection and scheduling problem.

  10. Exploring project selection behavior of academic scientists in India

    OpenAIRE

    Anju Chawla

    2007-01-01

    This study is based on retrospective accounts of a stratified sample of about 1,100 academic scien-tists in India on the criteria actually used by them in the choice of research projects. A basic objective is to examine the effects of contextual factors such as academic rank, institutional and disciplinary setting, and sources of research funds on the choice of research projects. A struc-tured questionnaire was used to tap the criteria for project selection. The items were factor-analyzed and...

  11. Integrating System Dynamic and Fuzzy Logic for Economic Assessment of BOT Projects

    Directory of Open Access Journals (Sweden)

    Farnad Nasirzadeh

    2016-03-01

    Full Text Available The selection of the most appropriate project for the investment is one of the most important decisions that should be made by the private investors. This problem is of vital importance in BOT projects, where the total investment as well as the investor's profit should be recovered by the project's income. There are several approaches proposed by the researchers to determine the best economical project in comparison to other projects. The previous researches, however, faced with some major defects. As an example, the effects of various factors affecting the project evaluation process as well as the existing risks and uncertainties are not taken into account. In this research, economic assessment of BOT projects is performed by integrating system dynamic simulation approach and fuzzy logic. For this purpose, first the project's NPV is modeled considering all the influencing factors qualitatively. The relationships that exist between different factors are then determined and the quantitative model is built. Using the developed model, the value of NPV is simulated considering the effects of all the influencing factors and the existing uncertainties. Finally, the value of project's NPV is determined as a triangular fuzzy number. Finally, the best alternative project is selected by comparing the simulated values of NPV. To evaluate the capabilities and performance of the proposed model, the project economical evaluation is performed for two highway projects and the best project is selected.

  12. Computational Experiment Study on Selection Mechanism of Project Delivery Method Based on Complex Factors

    Directory of Open Access Journals (Sweden)

    Xiang Ding

    2014-01-01

    Full Text Available Project delivery planning is a key stage used by the project owner (or project investor for organizing design, construction, and other operations in a construction project. The main task in this stage is to select an appropriate project delivery method. In order to analyze different factors affecting the PDM selection, this paper establishes a multiagent model mainly to show how project complexity, governance strength, and market environment affect the project owner’s decision on PDM. Experiment results show that project owner usually choose Design-Build method when the project is very complex within a certain range. Besides, this paper points out that Design-Build method will be the prior choice when the potential contractors develop quickly. This paper provides the owners with methods and suggestions in terms of showing how the factors affect PDM selection, and it may improve the project performance.

  13. ERP system implementation costs and selection factors of an implementation approach

    DEFF Research Database (Denmark)

    Johansson, Björn; Sudzina, Frantisek; Newman, Mike

    2011-01-01

    , which influence the implementation approach in an ERP project, cause also an increase of the project cost in a European context? Our survey was conducted in Denmark, Slovakia and Slovenia and focused on this issue. Our main findings are that: 1) the number of implemented modules influences selection......Different approaches on implementation of enterprise resource planning (ERPs) systems exist. In this article, we investigate relationship between factors influencing selection of implementation approach and companies' ability to stay within budget when implementing ERPs. The question is: do factors...... of an implementation approach; 2) companies with information strategies are more likely to stay within budget regarding ERP systems implementation. However, we also found that: 3) implementation approach does not significantly influence ability to stay within budget; 4) a clear relationship between factors influencing...

  14. The process of selecting technology development projects: a practical framework

    NARCIS (Netherlands)

    Herps, Joost M.J.; van Mal, Herman H.; Halman, Johannes I.M.; Martens, Jack H.M.; Borsboom, Ron H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  15. The process of selecting technology development projects : a practical framework

    NARCIS (Netherlands)

    Herps, J.M.J.; Mal, van H.H.; Halman, J.I.M.; Martens, J.H.M.; Borsboom, R.H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  16. Selection of topologies for the PHOTONERGY{sup TM} project. Optimised design and control of inverter for photovoltaic systems: the AC-module

    Energy Technology Data Exchange (ETDEWEB)

    Baekhoej Kjaer, S.

    2002-06-01

    The PHOTONERGY{sup TM} project (also known as the former 'SolcelleInverter' project) is by this report carried into its third stage; the selection of a suitable topology for the AC-Module inverter. The selection of a suitable topology is based on State-Of-The-Art analysis a specifications and a comparison of four grid-tied inverters and nine dc/dc converters. This implies 23 possible combinations, from which nine is investigated with respect to efficiency in six working points, the number of components and to some extent also the rating of the components. The conclusion is that the target of a European efficiency of 93.7% is hard to achieve. But four of the examined, and two newly discovered, inverters are recommended for a further examination by means of estimations, calculations and simulations of: cost, complexity, robustness, efficiency and mass-production. The system-layout is also examined. The first layout implies that the PV-Module and the inverter is integrated into one unit and the second layout involves that the inverter is placed indoor. The layouts are compared with respect to cable-losses, enclosure demanding and lifetime. The conclusion is somehow ambiguous and a further investigation should be initiated in order to get a clear result. (au)

  17. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  18. Project W-340 tank 241-C-106 manipulator system closeout summary

    International Nuclear Information System (INIS)

    McDaniel, L.B.

    1995-02-01

    This document summarizes the work that was ongoing when Project W-340 was put on hold. Project W-340: Tank 241-C-106 Manipulator Retrieval System, was a candidate FY98 Major System Acquisition. The project was to develop, procure and deploy a Long Reach Manipulator (LRM) waste retrieval system to provide an alternate method to completing the in-tank demonstration of Single Shell Tank waste retrieval technology. The need for enhanced capabilities derives from (1) the inability of the baseline technology to retrieve certain hard waste forms; (2) uncertainty in the quantity of leakage which will be allowed. Numerous studies over the years have identified an arm architecture as a promising retrieval technology to overcome these concerns. The W340 project was intended to further develop and demonstrate this alternative, as part of selecting the best approach for all tanks. Prior to completing the effort, it was determined that an LRM system was too architecture specific and was envisioned to be too expensive for a one time demonstration of retrieval technology. At the time the work was stopped, an effort was underway to broaden the project scope to allow alternatives to an arm-based system

  19. THE PROJECT OF THE EXPERT SYSTEM TO SUPPORTING OF SELECTION OF PARTS AND ASSEMBLIES OF MACHINES

    Directory of Open Access Journals (Sweden)

    Sebastian RZYDZIK

    2014-06-01

    Full Text Available This paper the design of the expert system that supports mechanical engineer in the process of selecting the parts and assemblies was presented. In the description of the proposed expert system, was made reference to the general form of such systems, that consist of such components as: user interface, inference engine, knowledge base and database. It also, scenario that describes the steps of the use of the proposed expert system was presented. Finally, an example of the use the expert system during the selection of the components of the drive system was shown.

  20. System design projects for undergraduate design education

    Science.gov (United States)

    Batill, S. M.; Pinkelman, J.

    1993-01-01

    Design education has received considerable in the recent past. This paper is intended to address one aspect of undergraduate design education and that is the selection and development of the design project for a capstone design course. Specific goals for a capstone design course are presented and their influence on the project selection are discussed. The evolution of a series of projects based upon the design of remotely piloted aircraft is presented along with students' perspective on the capstone experience.

  1. A proposed selection process in Over-The-Top project portfolio management

    Directory of Open Access Journals (Sweden)

    Jemy Vestius Confido

    2018-05-01

    Full Text Available Purpose: The purpose of this paper is to propose an Over-The-Top (OTT initiative selection process for communication service providers (CSPs entering an OTT business. Design/methodology/approach: To achieve this objective, a literature review was conducted to comprehend the past and current practices of the project (or initiative selection process as mainly suggested in project portfolio management (PPM. This literature was compared with specific situations and the needs of CSPs when constructing an OTT portfolio. Based on the contrast between the conventional project selection process and specific OTT characteristics, a different selection process is developed and tested using group model-building (GMB, which involved an in-depth interview, a questionnaire and a focus group discussion (FGD. Findings: The paper recommends five distinct steps for CSPs to construct an OTT initiative portfolio: candidate list of OTT initiatives, interdependency diagram, evaluation of all interdependent OTT initiatives, evaluation of all non-interdependent OTT initiatives and optimal portfolio of OTT initiatives. Research limitations/implications: The research is empirical, and various OTT services are implemented; the conclusion is derived only from one CSP, which operates as a group. Generalization of this approach will require further empirical tests on different CSPs, OTT players or any firms performing portfolio selection with a degree of interdependency among the projects. Practical implications: Having considered interdependency, the proposed OTT initiative selection steps can be further implemented by portfolio managers for more effective OTT initiative portfolio construction. Originality/value: While the previous literature and common practices suggest ensuring the benefits (mainly financial of individual projects, this research accords higher priority to the success of the overall OTT initiative portfolio and recommends that an evaluation of the overall

  2. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  3. Web Based Project Management System

    OpenAIRE

    Aadamsoo, Anne-Mai

    2010-01-01

    To increase an efficiency of a product, nowadays many web development companies are using different project management systems. A company may run a number of projects at a time, and requires input from a number of individuals, or teams for a multi level development plan, whereby a good project management system is needed. Project management systems represent a rapidly growing technology in IT industry. As the number of users, who utilize project management applications continues to grow, w...

  4. Metaphors in Managerial and Employee Sensemaking in an Information Systems Project

    DEFF Research Database (Denmark)

    Hekkala, Riitta; Stein, Mari-Klara; Rossi, Matti

    2018-01-01

    This longitudinal study looks at the metaphors used in a public sector information systems development project from the perspective of cognitive metaphor theory (Lakoff & Johnson,). We examine the use of metaphors by project team members, including representatives of the users, software developers......-intensive situations, metaphor use with unclear intentions and purpose hinders learning and creates more chaos than order. From a practical perspective, our study highlights the relevance of metaphor use for project management. We suggest that intentional selection of metaphors by management could be beneficial...

  5. EPRtm project experience: selection of partners and supply chain

    International Nuclear Information System (INIS)

    Lorenzo, D. de

    2012-01-01

    With 4 EPR T M units under construction, the new plants to be built in the following years will benefit from the return on experience of the work already performed. The knowledge about licensing processes, detail engineering, supply chain, logistics and on-site work gathered from the Olkiluoto 3 and Flamanville 3 projects has already been used in the Taishan 1 and 2 project, resulting in a project that is on schedule and on budget. This article will show how the advantage of such broad experience gained will be used to benefit future projects to ensure certainty of completion, leaving few and limited unresolved issues even before the beginning of the project. Several areas that are not usually tackled when speaking of a New Build project will be covered by this text from the point of view of a nuclear vendor: Project Partnership Selection and the Gate Review Process applied by AREVA in the supply chain of the main components. (Author)

  6. Selecting Large Portfolios of Social Projects in Public Organizations

    Directory of Open Access Journals (Sweden)

    Igor Litvinchev

    2014-01-01

    Full Text Available We address the portfolio selection of social projects in public organizations considering interdependencies (synergies affecting project funds requirements and tasks. A mixed integer linear programming model is proposed incorporating the most relevant aspects of the problem found in the literature. The model supports both complete (all or nothing and partial (a certain amount from a given interval of funding resource allocation policies. Numerical results for large-scale problem instances are presented.

  7. NPD project portfolio selection using reinvestment strategy in competitive environment

    Directory of Open Access Journals (Sweden)

    Alireza Ghassemi

    2018-01-01

    Full Text Available This study aims to design a new model for selecting most fitting new product development projects in a pool of projects. To catch the best model, we assume new products will be introduced to the competitive markets. Also, we suppose the revenue yielded by completed projects can be reinvested on implementation of other projects. Other sources of financing are borrowing loans from banks and initial capital of the firm. These limited resources determine most evaluated projects to be performed. Several types of interactions among different projects are considered to make the chosen projects more like a portfolio. In addition, some numerical examples from the real world are provided to demonstrate the applicability of the proposed model. These examples show how the particular considerations in the suggested model affect the results.

  8. HTR-E project. High-temperature components and systems

    International Nuclear Information System (INIS)

    Breuil, E.; Exner, R.

    2002-01-01

    The HTR-E European project (four years project) is proposed for the 5th Framework Programme and concerns the technical developments needed for the innovative components of a modern HTR with a direct cycle. These components have been selected with reference to the present projects (GT-MHR, PBMR): (1) the helium turbine, the recuperator heat exchanger, the electro-magnetic bearings and the helium rotating seal; (2) the tribology. Sliding innovative components in helium environment are particularly concerned. (3) the helium purification system. Recommendations on impurities contents have to be provided in accordance with the materials proposed for the innovative components. The main outcomes expected from the HTR-E project are the design recommendations and identification of further R and D needs for these components. This will be based: (1) on experience feedback from European past helium test loops and reactors; (2) on design studies, thermal-hydraulic and structural analyses; (3) and on experimental tests

  9. NASA: Assessments of Selected Large-Scale Projects

    Science.gov (United States)

    2011-03-01

    REPORT DATE MAR 2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE Assessments Of Selected Large-Scale Projects...Volatile EvolutioN MEP Mars Exploration Program MIB Mishap Investigation Board MMRTG Multi Mission Radioisotope Thermoelectric Generator MMS Magnetospheric...probes designed to explore the Martian surface, to satellites equipped with advanced sensors to study the earth , to telescopes intended to explore the

  10. COST AND TIME ESTIMATES DURING THE SUPPLIER SELECTION OF AN INFORMATION SYSTEM FOR LEGAL AREA: A CASE STUDY COMPARING TRADITIONAL AND AGILE PROJECT APPROACHES

    Directory of Open Access Journals (Sweden)

    Vieira, G. L. S.

    2017-06-01

    Full Text Available Considering a direct correlation between projects requirements details levels and their performance, this paper aims to evaluate whether the adoption of more extensive and detailed cost, time and scope estimation processes based on both practices, traditional and agile, and executed concurrently with the supplier selection stage, could guarantee greater accuracy in these estimates, thus increasing project success rates. Based on a case study for the information system project implementation into the legal area of a large Brazilian company, five suppliers had their proposals analyzed and compared in terms of the costs and deadlines involved, as well as the project management processes used in theirs estimates. From the obtained results, it was possible to observe that not all companies follow, at least during the prospecting phase, their service proposals described management processes, according to the theory. Another important finding was that the proposals involving, at least partially, agile approach concepts, were more likely to justify their estimates. These proposals still presented lower values, whenever compared to those less adherents to the theoretical concepts, as those based on traditional concepts.

  11. Performance-Based Technology Selection Filter description report. INEL Buried Waste Integrated Demonstration System Analysis project

    Energy Technology Data Exchange (ETDEWEB)

    O`Brien, M.C.; Morrison, J.L.; Morneau, R.A.; Rudin, M.J.; Richardson, J.G.

    1992-05-01

    A formal methodology has been developed for identifying technology gaps and assessing innovative or postulated technologies for inclusion in proposed Buried Waste Integrated Demonstration (BWID) remediation systems. Called the Performance-Based Technology Selection Filter, the methodology provides a formalized selection process where technologies and systems are rated and assessments made based on performance measures, and regulatory and technical requirements. The results are auditable, and can be validated with field data. This analysis methodology will be applied to the remedial action of transuranic contaminated waste pits and trenches buried at the Idaho National Engineering Laboratory (INEL).

  12. Factors Influencing the Selection of the Systems Integration Organizational Model Type for Planning and Implementing Government High-Technology Programs

    Science.gov (United States)

    Thomas, Leann; Utley, Dawn

    2006-01-01

    While there has been extensive research in defining project organizational structures for traditional projects, little research exists to support high technology government project s organizational structure definition. High-Technology Government projects differ from traditional projects in that they are non-profit, span across Government-Industry organizations, typically require significant integration effort, and are strongly susceptible to a volatile external environment. Systems Integration implementation has been identified as a major contributor to both project success and failure. The literature research bridges program management organizational planning, systems integration, organizational theory, and independent project reports, in order to assess Systems Integration (SI) organizational structure selection for improving the high-technology government project s probability of success. This paper will describe the methodology used to 1) Identify and assess SI organizational structures and their success rate, and 2) Identify key factors to be used in the selection of these SI organizational structures during the acquisition strategy process.

  13. On the use of polar coordinate system in the projective graphic drawings

    Directory of Open Access Journals (Sweden)

    Ivashchenko Andrey Viktorovich

    2016-11-01

    Full Text Available Projective graphics is a polyhedra simulation method, which is based on the use of trace diagrams of initial polyhedron. Previously developed computer software allows using Cartesian coordinates. In some cases it is advisable to use polar coordinate system for description of projective graphics drawings. Using the example of icosahedron the authors analyzed the advantages of using projective graphics drawings in the polar coordinate system. The transition to the polar coordinate system is a tool that allows using certain patterns of projective graphics drawings in the process of calculation. When using polar coordinate system the search of Polar correspondence for the directs is simplified. In order to analyze the two lines in the polar coordinate system it is enough to compare the corresponding coefficients of the equations of these lines. The authors consider a diagram of the icosahedron in polar coordinates, and a corresponding fragment of calculation program in the Mathematica system. Some examples of forming based on icosahedrons are offered. Optimization of computer programs using polar coordinate system will simplifies the calculations of projective graphics drawings, accelerates the process of constructing three-dimensional models, which expand the possibilities of selecting original solutions. Finally, the authors conclude that it is appropriate to use the polar coordinate system only in the construction of projective graphics diagrams of the planes system having rich symmetry. All Platonic and Archimedean solids, Catalan solid possess this property.

  14. Earth System Science Project

    Science.gov (United States)

    Rutherford, Sandra; Coffman, Margaret

    2004-01-01

    For several decades, science teachers have used bottles for classroom projects designed to teach students about biology. Bottle projects do not have to just focus on biology, however. These projects can also be used to engage students in Earth science topics. This article describes the Earth System Science Project, which was adapted and developed…

  15. How Do Contractors Select Suppliers for Greener Construction Projects? The Case of Three Swedish Companies

    Directory of Open Access Journals (Sweden)

    Shahin Mokhlesian

    2014-06-01

    Full Text Available There are many studies of contractor selection based on clients and the selection of suppliers by contractors. However, supplier selection specifically related to green construction projects has been much less studied. Green construction differs from conventional construction because of differences in its underlying principles and use of environmentally-friendly materials and technologies. This paper studies how procurers in contractor companies in Sweden adopt green projects and how contractor perception of supplier mastery of green knowledge affects supplier selection. The investigation is based on a set of semi-structured interviews conducted among three large contractors in Sweden. A main finding is that the perceived differences between green and conventional projects do not change supplier selection dramatically. An implication is that “greener projects” is a more appropriate denotation than “green project”. Evidence shows that suppliers’ green knowledge is an important factor in supplier selection, as respondents rated suppliers’ knowledge of green projects as very important, and to fix his, there was a consensus among respondents about the need for close collaboration between contractors and suppliers. To ensure knowledge acquisition from suppliers and to increase their competitive advantage over rivals, contractors collaborate with their suppliers in a partnering setting. It is anticipated that the results of this study will be used to fill the gap in the literature on supplier selection in green projects and can also be used for construction firms contemplating getting involved in green projects.

  16. AN EXCEL-BASED DECISION SUPPORT SYSTEM FOR SCORING AND RANKING PROPOSED R&D PROJECTS

    OpenAIRE

    ANNE DE PIANTE HENRIKSEN; SUSAN W. PALOCSAY

    2008-01-01

    One of the most challenging aspects of technology management is the selection of research and development (R&D) projects from among a group of proposals. This paper introduces an interactive, user-friendly decision support system for evaluating and ranking R&D projects and demonstrates its application on an example R&D program. It employs the scoring methodology developed by Henriksen and Traynor to provide a practical technique that considers both project merit and project cost in the evalua...

  17. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    Science.gov (United States)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of

  18. Phase selection in the mushy-zone: LODESTARS and ELFSTONE projects

    International Nuclear Information System (INIS)

    Matson, D M; Hyers, R W; Volkmann, T; Fecht, H-J

    2011-01-01

    In a collaboration sponsored by ESA and NASA, international partners have developed a work plan to successfully address key issues relating to understanding the role of convection on alloy phase selection for commercially important structural alloys using the MSL-EML facility aboard the International Space Station. The approach is two-pronged. First, ground and space-based experiments will develop a baseline database to anchor subsequent modelling predictions. Tasks include sample preparation and verification, ground-based transformation evaluation, space-based experiments, and thermophysical property evaluation to support modelling activities. Second, modelling and theoretical analysis tasks will lead to a new understanding of the role of convection in phase selection for this class of materials. These models will allow prediction and control of microstructural evolution during solidification processing. Tasks include modelling of macroconvection induced by the EM levitation field, modelling of microconvection within the dendrite array, nucleation modelling, and modelling of the transformation kinetics specific to each alloy system. This paper outlines how two NASA-sponsored projects relate to the goals of the international collaboration.

  19. Phase selection in the mushy-zone: LODESTARS and ELFSTONE projects

    Science.gov (United States)

    Matson, D. M.; Hyers, R. W.; Volkmann, T.; Fecht, H.-J.

    2011-12-01

    In a collaboration sponsored by ESA and NASA, international partners have developed a work plan to successfully address key issues relating to understanding the role of convection on alloy phase selection for commercially important structural alloys using the MSL-EML facility aboard the International Space Station. The approach is two-pronged. First, ground and space-based experiments will develop a baseline database to anchor subsequent modelling predictions. Tasks include sample preparation and verification, ground-based transformation evaluation, space-based experiments, and thermophysical property evaluation to support modelling activities. Second, modelling and theoretical analysis tasks will lead to a new understanding of the role of convection in phase selection for this class of materials. These models will allow prediction and control of microstructural evolution during solidification processing. Tasks include modelling of macroconvection induced by the EM levitation field, modelling of microconvection within the dendrite array, nucleation modelling, and modelling of the transformation kinetics specific to each alloy system. This paper outlines how two NASA-sponsored projects relate to the goals of the international collaboration.

  20. 6 Sigma project advance

    International Nuclear Information System (INIS)

    2002-12-01

    This book deals with 6 sigma project advance which introduces 6 sigma project in Changwon special steel, how is failure accepted? CTQ selection which is starting line, definition of performance standard, measurement system check on reliability of measurement data, check of process capacity for current level, establishment of target, optimal design and performance of application, practice of management system for maintain of improved result, CTQ selection, check of measurement system and practice of management system.

  1. Project Selection and Transparency Factors in Housing Public-Private Partnerships in Nigeria

    Directory of Open Access Journals (Sweden)

    Eziyi Offia Ibem

    2018-06-01

    Full Text Available The application of Public-Private Partners (PPPs in housing provisioning is on the increase across the world. However, there is a paucity of empirical studies on the specific factors considered at the initiation, and measures taken to ensure transparency at the procurement stages, of PPP housing projects. This study examined project selection factors and transparency measures in PPP housing projects using data sourced from oral interviews with 27 experts in nine PPP housing schemes in Nigeria. Results of the content analysis revealed that the top two selection factors considered by both the public and private sector operators of PPP housing projects in Nigeria are the availability of land and viability of the funding arrangements. Whereas the public-sector partners also consider the availability of competent private sector to deliver the projects, the private developers are concerned with the location of proposed projects. It was also found that the two key measures taken to ensure transparency at the procurement stage of the projects are transparent and competitive bidding and open advertisements of tender opportunities. These imply that before embarking on PPP housing projects, operators should ensure that there is available land in good locations, sound funding arrangements, and measures for achieving transparency in the schemes.

  2. Guidance, navigation, and control subsystem equipment selection algorithm using expert system methods

    Science.gov (United States)

    Allen, Cheryl L.

    1991-01-01

    Enhanced engineering tools can be obtained through the integration of expert system methodologies and existing design software. The application of these methodologies to the spacecraft design and cost model (SDCM) software provides an improved technique for the selection of hardware for unmanned spacecraft subsystem design. The knowledge engineering system (KES) expert system development tool was used to implement a smarter equipment section algorithm than that which is currently achievable through the use of a standard data base system. The guidance, navigation, and control subsystems of the SDCM software was chosen as the initial subsystem for implementation. The portions of the SDCM code which compute the selection criteria and constraints remain intact, and the expert system equipment selection algorithm is embedded within this existing code. The architecture of this new methodology is described and its implementation is reported. The project background and a brief overview of the expert system is described, and once the details of the design are characterized, an example of its implementation is demonstrated.

  3. Selective serotonergic excitation of callosal projection neurons

    Directory of Open Access Journals (Sweden)

    Daniel eAvesar

    2012-03-01

    Full Text Available Serotonin (5-HT acting as a neurotransmitter in the cerebral cortex is critical for cognitive function, yet how 5-HT regulates information processing in cortical circuits is not well understood. We tested the serotonergic responsiveness of layer 5 pyramidal neurons (L5PNs of the mouse medial prefrontal cortex (mPFC, and found 3 distinct response types: long-lasting 5-HT1A (1A receptor-dependent inhibitory responses (84% of L5PNs, 5-HT2A (2A receptor-dependent excitatory responses (9%, and biphasic responses in which 2A-dependent excitation followed brief inhibition (5%. Relative to 5-HT-inhibited neurons, those excited by 5-HT had physiological properties characteristic of callosal/commissural (COM neurons that project to the contralateral cortex. We tested whether serotonergic responses in cortical pyramidal neurons are correlated with their axonal projection pattern using retrograde fluorescent labeling of COM and corticopontine-projecting (CPn neurons. 5-HT generated excitatory or biphasic responses in all 5-HT-responsive layer 5 COM neurons. Conversely, CPn neurons were universally inhibited by 5-HT. Serotonergic excitation of COM neurons was blocked by the 2A antagonist MDL 11939, while serotonergic inhibition of CPn neurons was blocked by the 1A antagonist WAY 100635, confirming a role for these two receptor subtypes in regulating pyramidal neuron activity. Selective serotonergic excitation of COM neurons was not layer-specific, as COM neurons in layer 2/3 were also selectively excited by 5-HT relative to their non-labeled pyramidal neuron neighbors. Because neocortical 2A receptors are implicated in the etiology and pathophysiology of schizophrenia, we propose that COM neurons may represent a novel cellular target for intervention in psychiatric disease.

  4. The GEM Detector projective alignment simulation system

    International Nuclear Information System (INIS)

    Wuest, C.R.; Belser, F.C.; Holdener, F.R.; Roeben, M.D.; Paradiso, J.A.; Mitselmakher, G.; Ostapchuk, A.; Pier-Amory, J.

    1993-01-01

    Precision position knowledge (< 25 microns RMS) of the GEM Detector muon system at the Superconducting Super Collider Laboratory (SSCL) is an important physics requirement necessary to minimize sagitta error in detecting and tracking high energy muons that are deflected by the magnetic field within the GEM Detector. To validate the concept of the sagitta correction function determined by projective alignment of the muon detectors (Cathode Strip Chambers or CSCs), the basis of the proposed GEM alignment scheme, a facility, called the ''Alignment Test Stand'' (ATS), is being constructed. This system simulates the environment that the CSCs and chamber alignment systems are expected to experience in the GEM Detector, albeit without the 0.8 T magnetic field and radiation environment. The ATS experimental program will allow systematic study and characterization of the projective alignment approach, as well as general mechanical engineering of muon chamber mounting concepts, positioning systems and study of the mechanical behavior of the proposed 6 layer CSCs. The ATS will consist of a stable local coordinate system in which mock-ups of muon chambers (i.e., non-working mechanical analogs, representing the three superlayers of a selected barrel and endcap alignment tower) are implemented, together with a sufficient number of alignment monitors to overdetermine the sagitta correction function, providing a self-consistency check. This paper describes the approach to be used for the alignment of the GEM muon system, the design of the ATS, and the experiments to be conducted using the ATS

  5. A project-based geoscience curriculum: select examples

    Science.gov (United States)

    Brown, L. M.; Kelso, P. R.; White, R. J.; Rexroad, C. B.

    2007-12-01

    Principles of constructivist educational philosophy serve as a foundation for the recently completed National Science Foundation sponsored undergraduate curricular revision undertaken by the Geology Department of Lake Superior State University. We integrate lecture and laboratory sessions utilizing active learning strategies that focus on real-world geoscience experiences and problems. In this presentation, we discuss details of three research-like projects that require students to access original data, process and model the data using appropriate geological software, interpret and defend results, and disseminate results in reports, posters, and class presentations. The projects are from three upper division courses, Carbonate Systems, Sequence Stratigraphy, and Geophysical Systems, where teams of two to four students are presented with defined problems of durations ranging from a few weeks to an entire semester. Project goals and location, some background information, and specified dates and expectations for interim and final written and oral reports are provided to students. Some projects require the entire class to work on one data set, some require each team to be initially responsible for a portion of the project with teams ultimately merging data for interpretation and to arrive at final conclusions. Some projects require students to utilize data from appropriate geological web sites such as state geological surveys. Others require students to design surveys and utilize appropriate instruments of their choice for field data collection. Students learn usage and applications of appropriate geological software in compiling, processing, modeling, and interpreting data and preparing formal reports and presentations. Students uniformly report heightened interest and motivation when engaged in these projects. Our new curriculum has resulted in an increase in students" quantitative and interpretive skills along with dramatic improvement in communication and

  6. SELECTION OF EFFECTIVE MODELS OF PROJECT IMPLEMENTATION IN A CHANGING FINANCIAL SITUATION

    Directory of Open Access Journals (Sweden)

    Александр Иванович МЕНЕЙЛЮК

    2015-06-01

    Full Text Available The article describes the methods of selecting effective models of construction projects of residential buildings and recommendations for its use. The technique is based on the construction of the models in the program Microsoft Project and analysis using the program COMPEX. Methods can be used not only for building projects. It is especially effective in a variable financial situation.

  7. National inventory of selected biological monitoring programs. Summary report of current or recently completed projects, 1976

    Energy Technology Data Exchange (ETDEWEB)

    Kemp, H. T.

    1976-10-01

    The Inventory has resulted in establishment of a series of data bases containing biological monitoring information of varying types, namely, directory of investigators, record of projects received from mail questionnaire, detailed description of selected biomonitoring projects, and bibliographic citations supporting the projects received. This report contains detailed descriptions of selected biomonitoring projects organized on a state-by-state basis and with appropriate indices.

  8. Systematic approach to the application of automation, robotics, and machine intelligence systems (aramis) to future space projects

    Energy Technology Data Exchange (ETDEWEB)

    Smith, D B.S.

    1983-01-01

    The potential applications of automation, robotics and machine intelligence systems (ARAMIS) to space projects are investigated, through a systematic method. In this method selected space projects are broken down into space project tasks, and 69 of these tasks are selected for study. Candidate ARAMIS options are defined for each task. The relative merits of these options are evaluated according to seven indices of performance. Logical sequences of ARAMIS development are also defined. Based on this data, promising applications of ARAMIS are identified for space project tasks. General conclusions and recommendations for further study are also presented. 6 references.

  9. A Multidisciplinary Research Team Approach to Computer-Aided Drafting (CAD) System Selection. Final Report.

    Science.gov (United States)

    Franken, Ken; And Others

    A multidisciplinary research team was assembled to review existing computer-aided drafting (CAD) systems for the purpose of enabling staff in the Design Drafting Department at Linn Technical College (Missouri) to select the best system out of the many CAD systems in existence. During the initial stage of the evaluation project, researchers…

  10. Projected large flood event sensitivity to projection selection and temporal downscaling methodology

    Energy Technology Data Exchange (ETDEWEB)

    Raff, D. [U.S. Dept. of the Interior, Bureau of Reclamation, Denver, Colorado (United States)

    2008-07-01

    Large flood events, that influence regulatory guidelines as well as safety of dams decisions, are likely to be affected by climate change. This talk will evaluate the use of climate projections downscaled and run through a rainfall - runoff model and its influence on large flood events. The climate spatial downscaling is performed statistically and a re-sampling and scaling methodology is used to temporally downscale from monthly to daily signals. The signals are run through a National Weather Service operational rainfall-runoff model to produce 6-hour flows. The flows will be evaluated for changes in large events at look-ahead horizons from 2011 - 2040, 2041 - 2070, and 2071 - 2099. The sensitivity of results will be evaluated with respect to projection selection criteria and re-sampling and scaling criteria for the Boise River in Idaho near Lucky Peak Dam. (author)

  11. Projected large flood event sensitivity to projection selection and temporal downscaling methodology

    International Nuclear Information System (INIS)

    Raff, D.

    2008-01-01

    Large flood events, that influence regulatory guidelines as well as safety of dams decisions, are likely to be affected by climate change. This talk will evaluate the use of climate projections downscaled and run through a rainfall - runoff model and its influence on large flood events. The climate spatial downscaling is performed statistically and a re-sampling and scaling methodology is used to temporally downscale from monthly to daily signals. The signals are run through a National Weather Service operational rainfall-runoff model to produce 6-hour flows. The flows will be evaluated for changes in large events at look-ahead horizons from 2011 - 2040, 2041 - 2070, and 2071 - 2099. The sensitivity of results will be evaluated with respect to projection selection criteria and re-sampling and scaling criteria for the Boise River in Idaho near Lucky Peak Dam. (author)

  12. Activity modes selection for project crashing through deterministic simulation

    Directory of Open Access Journals (Sweden)

    Ashok Mohanty

    2011-12-01

    Full Text Available Purpose: The time-cost trade-off problem addressed by CPM-based analytical approaches, assume unlimited resources and the existence of a continuous time-cost function. However, given the discrete nature of most resources, the activities can often be crashed only stepwise. Activity crashing for discrete time-cost function is also known as the activity modes selection problem in the project management. This problem is known to be NP-hard. Sophisticated optimization techniques such as Dynamic Programming, Integer Programming, Genetic Algorithm, Ant Colony Optimization have been used for finding efficient solution to activity modes selection problem. The paper presents a simple method that can provide efficient solution to activity modes selection problem for project crashing.Design/methodology/approach: Simulation based method implemented on electronic spreadsheet to determine activity modes for project crashing. The method is illustrated with the help of an example.Findings: The paper shows that a simple approach based on simple heuristic and deterministic simulation can give good result comparable to sophisticated optimization techniques.Research limitations/implications: The simulation based crashing method presented in this paper is developed to return satisfactory solutions but not necessarily an optimal solution.Practical implications: The use of spreadsheets for solving the Management Science and Operations Research problems make the techniques more accessible to practitioners. Spreadsheets provide a natural interface for model building, are easy to use in terms of inputs, solutions and report generation, and allow users to perform what-if analysis.Originality/value: The paper presents the application of simulation implemented on a spreadsheet to determine efficient solution to discrete time cost tradeoff problem.

  13. FORMATION OF THE CONTENT OF THE PROJECT OF ORGANIZATION OF SECURITY SYSTEMS IN HOTEL BUSINESS

    Directory of Open Access Journals (Sweden)

    Антон Іванович РОГОВИЙ

    2015-05-01

    Full Text Available The article identified and analyzed features of the project management in systems of creating security systems for security systems for the enterprise of hotel business. We have identified the main technical means, which should provide maximum protection of people and infrastructure of hotels. In the article revealed the criteria that should guide the manager in the selection of one or other technical means. In summery we highlighted works, which have to be included in the content of the project of organization of complex security system of companies in the hotel business.

  14. Projecting technology change to improve space technology planning and systems management

    Science.gov (United States)

    Walk, Steven Robert

    2011-04-01

    Projecting technology performance evolution has been improving over the years. Reliable quantitative forecasting methods have been developed that project the growth, diffusion, and performance of technology in time, including projecting technology substitutions, saturation levels, and performance improvements. These forecasts can be applied at the early stages of space technology planning to better predict available future technology performance, assure the successful selection of technology, and improve technology systems management strategy. Often what is published as a technology forecast is simply scenario planning, usually made by extrapolating current trends into the future, with perhaps some subjective insight added. Typically, the accuracy of such predictions falls rapidly with distance in time. Quantitative technology forecasting (QTF), on the other hand, includes the study of historic data to identify one of or a combination of several recognized universal technology diffusion or substitution patterns. In the same manner that quantitative models of physical phenomena provide excellent predictions of system behavior, so do QTF models provide reliable technological performance trajectories. In practice, a quantitative technology forecast is completed to ascertain with confidence when the projected performance of a technology or system of technologies will occur. Such projections provide reliable time-referenced information when considering cost and performance trade-offs in maintaining, replacing, or migrating a technology, component, or system. This paper introduces various quantitative technology forecasting techniques and illustrates their practical application in space technology and technology systems management.

  15. A Study on Site Selecting for National Project including High Level Radioactive Waste Disposal

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kilyoo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    Many national projects are stopped since sites for the projects are not determined. The sites selections are hold by NIMBY for unpleasant facilities or by PYMFY for preferable facilities among local governments. The followings are the typical ones; NIMBY projects: high level radioactive waste disposal, THAAD, Nuclear power plant(NPP), etc. PIMFY projects: South-east new airport, KTX station, Research center for NPP decommission, etc. The site selection for high level radioactive waste disposal is more difficult problem, and thus government did not decide and postpone to a dead end street. Since it seems that there is no solution for site selection for high level radioactive waste disposal due to NIMBY among local governments, a solution method is proposed in this paper. To decide a high level radioactive waste disposal, the first step is to invite a bid by suggesting a package deal including PIMFY projects such as Research Center for NPP decommission. Maybe potential host local governments are asked to submit sealed bids indicating the minimum compensation sum that they would accept the high level radioactive waste disposal site. If there are more than one local government put in a bid, then decide an adequate site by considering both the accumulated PESS point and technical evaluation results. By considering how fairly preferable national projects and unpleasant national projects are distributed among local government, sites selection for NIMBY or PIMFY facilities is suggested. For NIMBY national projects, risk, cost benefit analysis is useful and required since it generates cost value to be used in the PESS. For many cases, the suggested method may be not adequate. However, similar one should be prepared, and be basis to decide sites for NIMBY or PIMFY national projects.

  16. Minimizing Project Cost by Integrating Subcontractor Selection Decisions with Scheduling

    Science.gov (United States)

    Biruk, Sławomir; Jaśkowski, Piotr; Czarnigowska, Agata

    2017-10-01

    Subcontracting has been a worldwide practice in the construction industry. It enables the construction enterprises to focus on their core competences and, at the same time, it makes complex project possible to be delivered. Since general contractors bear full responsibility for the works carried out by their subcontractors, it is their task and their risk to select a right subcontractor for a particular work. Although subcontractor management has been admitted to significantly affect the construction project’s performance, current practices and past research deal with subcontractor management and scheduling separately. The proposed model aims to support subcontracting decisions by integrating subcontractor selection with scheduling to enable the general contractor to select the optimal combination of subcontractors and own crews for all work packages of the project. The model allows for the interactions between the subcontractors and their impacts on the overall project performance in terms of cost and, indirectly, time and quality. The model is intended to be used at the general contractor’s bid preparation stage. The authors claim that the subcontracting decisions should be taken in a two-stage process. The first stage is a prequalification - provision of a short list of capable and reliable subcontractors; this stage is not the focus of the paper. The resulting pool of available resources is divided into two subsets: subcontractors, and general contractor’s in-house crews. Once it has been defined, the next stage is to assign them to the work packages that, bound by fixed precedence constraints, form the project’s network diagram. Each package is possible to be delivered by the general contractor’s crew or some of the potential subcontractors, at a specific time and cost. Particular crews and subcontractors can be contracted more than one package, but not at the same time. Other constraints include the predefined project completion date (the project is

  17. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  18. New Method of Selecting Efficient Project Portfolios in the Presence of Hybrid Uncertainty

    Directory of Open Access Journals (Sweden)

    Bogdan Rębiasz

    2016-01-01

    Full Text Available A new methods of selecting efficient project portfolios in the presence of hybrid uncertainty has been presented. Pareto optimal solutions have been defined by an algorithm for generating project portfolios. The method presented allows us to select efficient project portfolios taking into account statistical and economic dependencies between projects when some of the parameters used in the calculation of effectiveness can be expressed in the form of an interactive possibility distribution and some in the form of a probability distribution. The procedure for processing such hybrid data combines stochastic simulation with nonlinear programming. The interaction between data are modeled by correlation matrices and the interval regression. Economic dependences are taken into account by the equations balancing the production capacity of the company. The practical example presented indicates that an interaction between projects has a significant impact on the results of calculations. (original abstract

  19. A systematic approach to the application of Automation, Robotics, and Machine Intelligence Systems /ARAMIS/ to future space projects

    Science.gov (United States)

    Smith, D. B. S.

    1982-01-01

    The potential applications of Automation, Robotics, and Machine Intelligence Systems (ARAMIS) to space projects are investigated, through a systematic method. In this method selected space projects are broken down into space project tasks, and 69 of these tasks are selected for study. Candidate ARAMIS options are defined for each task. The relative merits of these options are evaluated according to seven indices of performance. Logical sequences of ARAMIS development are also defined. Based on this data, promising applications of ARAMIS are

  20. CMS Proposal for the Engineering Data Management System (EDMS) Pilot Project with Matrix & Report

    CERN Document Server

    Kuipers, Jos

    1997-01-01

    The CMS Working Group for Engineering and Integration ( WOGEI) has been involved in the Engineering Data Management System ( EDMS) Task Force. This Task Force has started in 1995 with definition and selection procedure for an EDMS. The aim is to find out whether an EDMS is useful for CERN and the LHC experiments and which product is most suited. The CMS-WOGEI has proposed and carried out a pilot project with Matrix, the EDMS selected by the EDMS task force. In this technical note the pilot project is described and the experience gained with this is summarised.

  1. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  2. Mapping and industrial IT project to a 2nd semester design-build project

    DEFF Research Database (Denmark)

    Nyborg, Mads; Høgh, Stig

    2010-01-01

    CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project in the D......CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project...... in the Diploma IT program at the Technical University of Denmark. The system in question is a weighing system operating in a LAN environment. The system is used in the medical industry for producing tablets. We present the design of a curriculum to support the development of major components of the weighing...... system. A simple teaching model for software engineering is presented which combines technical disciplines with disciplines from section 2-4 in the CDIO syllabus. The implementation of a joint project involving several courses supports the CDIO perspective. Already the traditional IT-diploma education...

  3. Where neuroscience and dynamic system theory meet autonomous robotics: a contracting basal ganglia model for action selection.

    Science.gov (United States)

    Girard, B; Tabareau, N; Pham, Q C; Berthoz, A; Slotine, J-J

    2008-05-01

    Action selection, the problem of choosing what to do next, is central to any autonomous agent architecture. We use here a multi-disciplinary approach at the convergence of neuroscience, dynamical system theory and autonomous robotics, in order to propose an efficient action selection mechanism based on a new model of the basal ganglia. We first describe new developments of contraction theory regarding locally projected dynamical systems. We exploit these results to design a stable computational model of the cortico-baso-thalamo-cortical loops. Based on recent anatomical data, we include usually neglected neural projections, which participate in performing accurate selection. Finally, the efficiency of this model as an autonomous robot action selection mechanism is assessed in a standard survival task. The model exhibits valuable dithering avoidance and energy-saving properties, when compared with a simple if-then-else decision rule.

  4. Seismic safety margins research program. Phase I final report - Plant/site selection and data collection (Project I)

    International Nuclear Information System (INIS)

    Chuang, T.Y.

    1981-07-01

    Project I of Phase I of the Seismic Safety Margins Research Program (SSMRP) comprised two parts: the selection of a representative nuclear power plant/site for study in Phase I and the collection of data needed by the other SSMRP projects. Unit 1 of the Zion Nuclear Power Plant in Zion, Illinois, was selected for the SSMRP Phase I studies. Unit 1 of the Zion plant has been validated as a good choice for the Phase I study plant. Although no single nuclear power plant can represent all such plants equally well, selection criteria were developed to maximize the generic implications of Phase I of the SSMRP. On the basis of the selection criteria, the Zion plant and its site were found to be reasonably representative of operating and future plants with regard to its nuclear steam supply system; the type of containment structure (prestressed concrete); its electrical capacity (1100 MWe); its location (the Midwest); the peak seismic acceleration used for design (0.17g); and the properties of the underlying soil (the low-strain shear-wave velocity is 1650 ft/s in a 50- to 100-ft-thick layer of soil overlying sedimentary bedrock). (author)

  5. Optimal Site Selection of Wind-Solar Complementary Power Generation Project for a Large-Scale Plug-In Charging Station

    Directory of Open Access Journals (Sweden)

    Wenjun Chen

    2017-10-01

    Full Text Available The wind-solar hybrid power generation project combined with electric vehicle charging stations can effectively reduce the impact on the power system caused by the random charging of electric cars, contribute to the in-situ wind-solar complementary system and reduce the harm arising from its output volatility. In this paper, the site selection index system of a landscape complementary power generation project is established by using the statistical methods and statistical analysis in the literature. Subsequently, using the Analytic Network Process to calculate the index weight, a cloud model was used in combination with preference ranking organization method for enrichment evaluations to transform and sort uncertain language information. Finally, using the results of the decision-making for the location of the Shanghai wind-solar complementary project and by carrying out contrast analysis and sensitivity analysis, the superiority and stability of the decision model constructed in this study was demonstrated.

  6. Project evaluation and selection using fuzzy Delphi method and zero - one goal programming

    Science.gov (United States)

    Alias, Suriana; Adna, Nofarziah; Arsad, Roslah; Soid, Siti Khuzaimah; Ali, Zaileha Md

    2014-12-01

    Project evaluation and selection is a factor affecting the impotence of board director in which is trying to maximize all the possible goals. Assessment of the problem occurred in organization plan is the first phase for decision making process. The company needs a group of expert to evaluate the problems. The Fuzzy Delphi Method (FDM) is a systematic procedure to evoke the group's opinion in order to get the best result to evaluate the project performance. This paper proposes an evaluation and selection of the best alternative project based on combination of FDM and Zero - One Goal Programming (ZOGP) formulation. ZOGP is used to solve the multi-criteria decision making for final decision part by using optimization software LINDO 6.1. An empirical example on an ongoing decision making project in Johor, Malaysia is implemented for case study.

  7. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  8. BIM-Based Decision Support System for Material Selection Based on Supplier Rating

    Directory of Open Access Journals (Sweden)

    Abiola Akanmu

    2015-12-01

    Full Text Available Material selection is a delicate process, typically hinged on a number of factors which can be either cost or environmental related. This process becomes more complicated when designers are faced with several material options of building elements and each option can be supplied by different suppliers whose selection criteria may affect the budgetary and environmental requirements of the project. This paper presents the development of a decision support system based on the integration of building information models, a modified harmony search algorithm and supplier performance rating. The system is capable of producing the cost and environmental implications of different material combinations or building designs. A case study is presented to illustrate the functionality of the developed system.

  9. Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects

    Energy Technology Data Exchange (ETDEWEB)

    Sanders, Mark D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mathew, Paul [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-05-01

    This guide presents a process for three key activities for the building owner in preparing to retrofit existing commercial buildings: selecting project teams, benchmarking the existing building, and financing the retrofit work. Although there are other essential steps in the retrofit process, the three activities presented in this guide are the critical elements where the building owner has the greatest influence on the outcome of the project.

  10. Channel Selection and Feature Projection for Cognitive Load Estimation Using Ambulatory EEG

    Directory of Open Access Journals (Sweden)

    Tian Lan

    2007-01-01

    Full Text Available We present an ambulatory cognitive state classification system to assess the subject's mental load based on EEG measurements. The ambulatory cognitive state estimator is utilized in the context of a real-time augmented cognition (AugCog system that aims to enhance the cognitive performance of a human user through computer-mediated assistance based on assessments of cognitive states using physiological signals including, but not limited to, EEG. This paper focuses particularly on the offline channel selection and feature projection phases of the design and aims to present mutual-information-based techniques that use a simple sample estimator for this quantity. Analyses conducted on data collected from 3 subjects performing 2 tasks (n-back/Larson at 2 difficulty levels (low/high demonstrate that the proposed mutual-information-based dimensionality reduction scheme can achieve up to 94% cognitive load estimation accuracy.

  11. Systems approach to project risk management

    Energy Technology Data Exchange (ETDEWEB)

    Kindinger, J. P. (John P.)

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  12. User-Oriented Project Accounting System.

    Science.gov (United States)

    Hess, Larry G.; Alcorn, Lisa S.

    1990-01-01

    The project accounting system used by the University of Illinois Urbana-Champaign School of Chemical Sciences exchanges financial data with the campus' central accounting system and allows integration of this information with user-entered data to produce an easily read, fully obligated project accounting statement for the budget and period…

  13. Hydrogen selective membrane for the natural gas system. Development of CO{sub 2}-selective biogas membrane. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Vestboe, A.P.

    2012-02-15

    The project started as a literature study and technology development project for a hydrogen selective membrane for the natural gas system. The introduction of hydrogen (for example produced from wind turbines by surplus electricity) in the gas system makes it possible to store energy which can be selectively used with high energy conversion in fuel cells directly located at the end users. In order to make this possible, it is necessary to have a separating unit that can selectively remove hydrogen from the gas mixture and deliver it as fuel to the electrical generator (a fuel cell). In the project, several existing technologies were evaluated with regard to the application in view. It was concluded that while other technologies are ripe, they are costly in energy and unsuitable for the relatively low capacity application that are in question close to the end users. Membrane technology was evaluated to be the most suitable, although the technology is still under development in many cases. In the project it was found that metallic membranes in the form of palladium coated stainless discs would answer the needs for the high purity needed. Laboratory development yielded discs that could separate hydrogen from natural gas, however, the flux was low compared to the needs of the application. It was found that at least 2 bar pressure difference of hydrogen would be needed to get a high enough flux. The way to achieve this pressure would necessitate a compressor which would consume an energy amount high enough to invalidate the concept. When concluding on the results and the study it was found that the direction of the project could be changed towards developing CO{sub 2}-selective membranes with the goal of developing membrane technology that could upgrade biogas by removing CO{sub 2}. The laboratory equipment and setup that were developed in the first part of the project could be used directly in this second part of the project. In this second part of the project it was

  14. A process for selection and training of super-users for ERP implementation projects

    DEFF Research Database (Denmark)

    Danielsen, Peter; Sandfeld Hansen, Kenneth; Helt, Mads

    2017-01-01

    The concept of super-users as a means to facilitate ERP implementation projects has recently taken a foothold in practice, but is still largely overlooked in research. In particular, little is known about the selection and training processes required to successfully develop skilled super-users in......The concept of super-users as a means to facilitate ERP implementation projects has recently taken a foothold in practice, but is still largely overlooked in research. In particular, little is known about the selection and training processes required to successfully develop skilled super...

  15. Mirror Confinement Systems: project summaries

    International Nuclear Information System (INIS)

    1980-07-01

    This report contains descriptions of the projects supported by the Mirror Confinement Systems (MCS) Division of the Office of Fusion Energy. The individual project summaries were prepared by the principal investigators, in collaboration with MCS staff office, and include objectives and milestones for each project. In addition to project summaries, statements of Division objectives and budget summaries are also provided

  16. On quantifying uncertainty for project selection: the case of renewable energy sources' investment

    International Nuclear Information System (INIS)

    Kirytopoulos, Konstantinos; Rentizelas, Athanassios; Tziralis, Georgios

    2006-01-01

    The selection of a project among different alternatives, considering the limited resources of a company (organisation), is an added value process that determines the prosperity of an undertaken project (investment). This applies also to the 'boming' Renewable Energy Sector, especially under the circumstances established by the recent activation of the Kyoto protocal and by the plethora of available choices for renewable energy sources (RES) projjects. The need for a reliable project selection method among the various alternatives is, therefore, highlighted and, in this context, the paper proposes the NPV function as one of possible criteria for the selection of a RES project. Furthermore, it differentiates from the typical NPV calculation process by adding the concept of a probabilistic NPV approach through Monte Carlo simulation. Reality is non-deterministic, so any attempt of modelling it by using a deterministic approach is by definition erroneous. The paper ultimately proposes a process of substituting the point with a range estimation, capable of quantifying the various uncertainty factors and in this way elucidate the accomplishment possibilities of eligible scenarious. The paper is enhanced by case study showing how the proposed method can be practically applied to support the investment decision, thus enabling the decision makers to judge its effectiveness and usefulness.(Author)

  17. An analysis of project selection and assignment criteria of danish tenders in europe

    DEFF Research Database (Denmark)

    Larsen, Jesper Kranker; Ussing, Lene Faber; Brunø, Thomas Ditlev

    2013-01-01

    , and 3/ any significant difference between the use of selection and assignment criteria in Danish public construction projects. The study uses a quantitative research approach where 157 Danish public tender cases were selected from the European Tenders Electronic Daily database between the period...

  18. Project Selection in the Design Studio: Absence of Learning Environments

    Science.gov (United States)

    Basa, Inci

    2010-01-01

    Project selection is an essential matter of design teaching. Based on observations of a specific curriculum, the author claims that a wide repertoire of subjects including offices, restaurants, hotels, and other public places are used to prepare design students, but that schools and other "learning environments/ schools" are similarly…

  19. The ENTRIA project. Selected disciplinary and interdisciplinary research topics

    International Nuclear Information System (INIS)

    Roehlig, Klaus-Juergen; Hocke, Peter; Walther, Clemens

    2015-01-01

    ENTRIA (''Disposal Options for Radioactive Residues: Interdisciplinary Analyses and Development of Evaluation Principles'', www.entria.de) is a joint research project carried out by twelve departments and institutes from German universities and major research institutions and one partner from Switzerland. It is financed by the German Ministry of Education and Research (BMBF). Scientists representing natural sciences, civil engineering, philosophy, law, social and political sciences, and technology assessment carry out disciplinary and interdisciplinary research addressing three options to manage especially high-level radioactive waste: - Final disposal in deep geological formations without any arrangements for retrieval, - disposal in deep geological formations with arrangements for monitoring and retrieval, and - (prolonged) surface (or near-surface) storage. In the paper, the following selected research topics - both disciplinary and interdisciplinary - are briefly introduced in order to provide an impression of the project scope: - Surface storage, - reference concepts for emplacement in deep geological formations with retrievability and monitoring, - radiation exposure and justification of measures, - interdisciplinary perspectives on dose limits, - comparative studies on nuclear waste governance, - nuclear waste governance in Switzerland, - public involvement and the German Site Selection Act, and - citizens' jury.

  20. Essentials of Project and Systems Engineering Management

    CERN Document Server

    Eisner, Howard S

    2008-01-01

    The Third Edition of Essentials of Project and Systems Engineering Management enables readers to manage the design, development, and engineering of systems effectively and efficiently. The book both defines and describes the essentials of project and systems engineering management and, moreover, shows the critical relationship and interconnection between project management and systems engineering. The author's comprehensive presentation has proven successful in enabling both engineers and project managers to understand their roles, collaborate, and quickly grasp and apply all the basic princip

  1. 324 Building liquid waste handling and removal system project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ham, J.E.

    1998-07-29

    This report evaluates the modification options for handling radiological liquid waste generated during decontamination and cleanout of the 324 Building. Recent discussions indicate that the Hanford site railroad system will be closed by the end of FY 1998 necessitating the need for an alternate transfer method. The issue of handling of Radioactive Liquid Waste (RLW) from the 324 Building (assuming the 340 Facility is not available to accept the RLW) has been examined in at least two earlier engineering studies (Parsons 1997a and Hobart 1997). Each study identified a similar preferred alternative that included modifying the 324 Building RLWS to allow load-out of wastewater to a truck tanker, while making maximum use of existing piping, tanks, instrumentation, controls and other features to minimize costs and physical changes to the building. This alternative is accepted as the basis for further discussion presented in this study. The goal of this engineering study is to verify the path forward presented in the previous studies and assure that the selected alternative satisfies the 324 Building deactivation goals and objectives as currently described in the project management plan. This study will also evaluate options available to implement the preferred alternative and select the preferred option for implementation of the entire system. Items requiring further examination will also be identified. Finally, the study will provide a conceptual design, schedule and cost estimate for the required modifications to the 324 Building to allow removal of RLW. Attachment 5 is an excerpt from the project baseline schedule found in the Project Management Plan.

  2. Health System Measurement Project

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Health System Measurement Project tracks government data on critical U.S. health system indicators. The website presents national trend data as well as detailed...

  3. Pilot Project to Optimize Superfund-financed Pump and Treat Systems: Summary Report and Lessons Learned

    Science.gov (United States)

    This report summarizes Phase II (site optimization) of the Nationwide Fund-lead Pump and Treat Optimization Project. This phase included conducting Remediation System Evaluations (RSEs) at each of the 20 sites selected in Phase I.

  4. ANG coal gasification project management control system report. [Great Plains project

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    Much time, money and effort has been spent in the forefront of this project for project controls. The work breakdown structure for the systems has been custom designed. The systems, both manual and computerized, have been well scrutinized and chosen by ANG to represent the most cost effective and efficient way of controlling a project the magnitude of $1.5 billion. These systems have been developed in a manner so that information can be gathered as detailed or as summarized as necessary, and in the most timely and expeditious ways.

  5. Machine-Vision Systems Selection for Agricultural Vehicles: A Guide

    Directory of Open Access Journals (Sweden)

    Gonzalo Pajares

    2016-11-01

    Full Text Available Machine vision systems are becoming increasingly common onboard agricultural vehicles (autonomous and non-autonomous for different tasks. This paper provides guidelines for selecting machine-vision systems for optimum performance, considering the adverse conditions on these outdoor environments with high variability on the illumination, irregular terrain conditions or different plant growth states, among others. In this regard, three main topics have been conveniently addressed for the best selection: (a spectral bands (visible and infrared; (b imaging sensors and optical systems (including intrinsic parameters and (c geometric visual system arrangement (considering extrinsic parameters and stereovision systems. A general overview, with detailed description and technical support, is provided for each topic with illustrative examples focused on specific applications in agriculture, although they could be applied in different contexts other than agricultural. A case study is provided as a result of research in the RHEA (Robot Fleets for Highly Effective Agriculture and Forestry Management project for effective weed control in maize fields (wide-rows crops, funded by the European Union, where the machine vision system onboard the autonomous vehicles was the most important part of the full perception system, where machine vision was the most relevant. Details and results about crop row detection, weed patches identification, autonomous vehicle guidance and obstacle detection are provided together with a review of methods and approaches on these topics.

  6. Web-based Project Reporting System

    Data.gov (United States)

    US Agency for International Development — Web-PRS is a web-based system that captures financial information and project status information that is sortable by geographical location, pillar, project type and...

  7. Real Property Project Tracking System (RPPTS)

    Data.gov (United States)

    Department of Veterans Affairs — The Real Property Project Tracking System (RPPTS), formerly known as the Lease/Project Tracking (LEASE) database, contains information about lease and land projects...

  8. Selection of Investment Projects by Monte Carlo Method in Risk Condition

    Directory of Open Access Journals (Sweden)

    M. E.

    2017-12-01

    Full Text Available The Monte Carlo method (also known as the Monte Carlo simulation was proposed by Nicholas Metropolis, S. Ulam and Jhon Von Neiman in 50-th years of the past century. The method can be widely applied to analysis of investment projects due to the advantages recognized both by practitioners and the academic community. The balance model of a project with discounted financial flows has been implemented for Microsoft Excel and Google Docs spread-sheet solutions. The Monte Carlo method for project with low and high correlated net present value (NPV parameters in the environment of the electronic tables of MS Excel/Google Docs. A distinct graduation of risk was identified. A necessity of account of correlation effects and the use of multivariate imitation during the project selection has been demonstrated.

  9. A Selection Method for COTS Systems

    DEFF Research Database (Denmark)

    Hedman, Jonas

    new skills and methods supporting the process of evaluating and selecting information systems. This paper presents a method for selecting COTS systems. The method includes the following phases: problem framing, requirements and appraisal, and selection of systems. The idea and distinguishing feature...... behind the method is that improved understanding of organizational' ends' or goals should govern the selection of a COTS system. This can also be expressed as a match or fit between ‘ends' (e.g. improved organizational effectiveness) and ‘means' (e.g. implementing COTS systems). This way of approaching...

  10. A Framework for Six Sigma Project Selection in Higher Educational Institutions, Using a Weighted Scorecard Approach

    Science.gov (United States)

    Holmes, Monica C.; Jenicke, Lawrence O.; Hempel, Jessica L.

    2015-01-01

    Purpose: This paper discusses the importance of the Six Sigma selection process, describes a Six Sigma project in a higher educational institution and presents a weighted scorecard approach for project selection. Design/Methodology/Approach: A case study of the Six Sigma approach being used to improve student support at a university computer help…

  11. Nuclear power project management information system

    International Nuclear Information System (INIS)

    Zou Lailong; Zhang Peng; Xiao Ziyan; Chun Zengjun; Huang Futong

    2001-01-01

    Project Management Information System is an important infrastructure facility for the construction and operation of Nuclear Power Station. Based on the practice of Lingao nuclear power project management information system (NPMIS), the author describes the NPMIS design goals, system architecture and software functionality, points out the outline issues during the development and deployment of NPMIS

  12. Data management strategies for multinational large-scale systems biology projects.

    Science.gov (United States)

    Wruck, Wasco; Peuker, Martin; Regenbrecht, Christian R A

    2014-01-01

    Good accessibility of publicly funded research data is essential to secure an open scientific system and eventually becomes mandatory [Wellcome Trust will Penalise Scientists Who Don't Embrace Open Access. The Guardian 2012]. By the use of high-throughput methods in many research areas from physics to systems biology, large data collections are increasingly important as raw material for research. Here, we present strategies worked out by international and national institutions targeting open access to publicly funded research data via incentives or obligations to share data. Funding organizations such as the British Wellcome Trust therefore have developed data sharing policies and request commitment to data management and sharing in grant applications. Increased citation rates are a profound argument for sharing publication data. Pre-publication sharing might be rewarded by a data citation credit system via digital object identifiers (DOIs) which have initially been in use for data objects. Besides policies and incentives, good practice in data management is indispensable. However, appropriate systems for data management of large-scale projects for example in systems biology are hard to find. Here, we give an overview of a selection of open-source data management systems proved to be employed successfully in large-scale projects.

  13. The APOSTLE project: Local Group kinematic mass constraints and simulation candidate selection

    Science.gov (United States)

    Fattahi, Azadeh; Navarro, Julio F.; Sawala, Till; Frenk, Carlos S.; Oman, Kyle A.; Crain, Robert A.; Furlong, Michelle; Schaller, Matthieu; Schaye, Joop; Theuns, Tom; Jenkins, Adrian

    2016-03-01

    We use a large sample of isolated dark matter halo pairs drawn from cosmological N-body simulations to identify candidate systems whose kinematics match that of the Local Group (LG) of galaxies. We find, in agreement with the `timing argument' and earlier work, that the separation and approach velocity of the Milky Way (MW) and Andromeda (M31) galaxies favour a total mass for the pair of ˜5 × 1012 M⊙. A mass this large, however, is difficult to reconcile with the small relative tangential velocity of the pair, as well as with the small deceleration from the Hubble flow observed for the most distant LG members. Halo pairs that match these three criteria have average masses a factor of ˜2 times smaller than suggested by the timing argument, but with large dispersion. Guided by these results, we have selected 12 halo pairs with total mass in the range 1.6-3.6 × 1012 M⊙ for the APOSTLE project (A Project Of Simulating The Local Environment), a suite of hydrodynamical resimulations at various numerical resolution levels (reaching up to ˜104 M⊙ per gas particle) that use the subgrid physics developed for the EAGLE project. These simulations reproduce, by construction, the main kinematics of the MW-M31 pair, and produce satellite populations whose overall number, luminosities, and kinematics are in good agreement with observations of the MW and M31 companions. The APOSTLE candidate systems thus provide an excellent testbed to confront directly many of the predictions of the Λ cold dark matter cosmology with observations of our local Universe.

  14. Project as a System and its Management

    Directory of Open Access Journals (Sweden)

    Jiří Skalický

    2017-06-01

    Full Text Available The contribution aims to describe project as a system, to define project control goal and strategy, control variables and their relationships. Three common control variables represented by the project triangle, are extended by two other important variables – project risk and quality. The control system consists of two components: social one – project manager and project team – and technical one – project dynamic simulation model as a decision making support of project manager in project milestones. In the project planning phase, the project baseline with planned controlled variables is created. In milestones after project launch, the actual values of these variables are measured. If the actual values deviate from planned ones, corrective actions are proposed and new baseline for the following control interval is created. Project plan takes into account the actual project progress and optimum corrective actions are determined by simulation, respecting control strategy and availability of resources. The contribution presents list of references to articles dealing with project as a system and its simulation. In most cases, they refer to the project control using the Earned Value Management method and its derivatives. Using of the dynamic simulation model for project monitoring and control, suggested in this contribution, presents a novel approach. The proposed model can serve as departure point to future research of authors and for development of appropriate and applicable tool.

  15. Implementing polytope projects for smart systems

    CERN Document Server

    Iordache, Octavian

    2017-01-01

    This book presents a domain of extreme industrial and scientific interest: the study of smart systems and structures. It presents polytope projects as comprehensive physical and cognitive architectures that support the investigation, fabrication and implementation of smart systems and structures. These systems feature multifunctional components that can perform sensing, control, and actuation. In light of the fact that devices, tools, methodologies and organizations based on electronics and information technology for automation, specific to the third industrial revolution, are increasingly reaching their limits, it is essential that smart systems be implemented in industry. Polytope projects facilitate the utilization of smart systems and structures as key elements of the fourth industrial revolution. The book begins by presenting polytope projects as a reference architecture for cyber-physical systems and smart systems, before addressing industrial process synthesis in Chapter 2. Flow-sheet trees, cyclic sep...

  16. Process Intensification in Fuel Cell CHP Systems, the ReforCELL Project

    Directory of Open Access Journals (Sweden)

    José Luis Viviente

    2016-10-01

    Full Text Available This paper reports the findings of a FP7/FCH JU project (ReforCELL that developed materials (catalysts and membranes and an advance autothermal membrane reformer for a micro Combined Heat and Power (CHP system of 5 kWel based on a polymer electrolyte membrane fuel cell (PEMFC. In this project, an active, stable and selective catalyst was developed for the reactions of interest and its production was scaled up to kg scale (TRL5 (TRL: Technology Readiness Level. Simultaneously, new membranes for gas separation were developed. In particular, dense supported thin palladium-based membranes were developed for hydrogen separation from reactive mixtures. These membranes were successfully scaled up to TRL4 and used in lab-scale reactors for fluidized bed steam methane reforming (SMR and autothermal reforming (ATR and in a prototype reactor for ATR. Suitable sealing techniques able to integrate the different membranes in lab-scale and prototype reactors were also developed. The project also addressed the design and optimization of the subcomponents (BoP for the integration of the membrane reformer to the fuel cell system.

  17. TidGen Power System Commercialization Project

    Energy Technology Data Exchange (ETDEWEB)

    Sauer, Christopher R. [President & CEO; McEntee, Jarlath [VP Engineering & CTO

    2013-12-30

    ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen® Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPC’s tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen® Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen® Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric

  18. Expert system application education project

    Science.gov (United States)

    Gonzelez, Avelino J.; Ragusa, James M.

    1988-01-01

    Artificial intelligence (AI) technology, and in particular expert systems, has shown potential applicability in many areas of operation at the Kennedy Space Center (KSC). In an era of limited resources, the early identification of good expert system applications, and their segregation from inappropriate ones can result in a more efficient use of available NASA resources. On the other hand, the education of students in a highly technical area such as AI requires an extensive hands-on effort. The nature of expert systems is such that proper sample applications for the educational process are difficult to find. A pilot project between NASA-KSC and the University of Central Florida which was designed to simultaneously address the needs of both institutions at a minimum cost. This project, referred to as Expert Systems Prototype Training Project (ESPTP), provided NASA with relatively inexpensive development of initial prototype versions of certain applications. University students likewise benefit by having expertise on a non-trivial problem accessible to them at no cost. Such expertise is indispensible in a hands-on training approach to developing expert systems.

  19. A secure communication system using projective-lag and/or projective-anticipating synchronizations of coupled multidelay feedback systems

    International Nuclear Information System (INIS)

    Thang Manh Hoang; Nakagawa, Masahiro

    2008-01-01

    In this paper, a chaotic secure communication system is proposed by using the schemes of projective-lag and/or projective-anticipating synchronizations of coupled multidelay feedback systems and the modulation technique of synchronization-manifold shift keying. Further, the security of the proposed system is enhanced by using non-stationary dynamics in the master and/or non-stationary synchronization manifolds. The specific examples using modified Ikeda systems demonstrate and verify the effectiveness of the proposed system

  20. R and D programmes in Germany. Selection and evaluation of projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    In Germany, budgets for research and development rest on three pillars, which are the federal government, the 16 states, and the civil sector. The total expenditure for 1997 amounted to 83.7 times 1 billion Deutsche marks, and this occupied 2.3 of Germany's GNP (gross national product). National research projects constitute the main stream even today. As for federal government-financed projects, they are managed mainly by BMBF (Federal Ministry of Education, Science, Research, and Technology). There are project carriers as the managerial organizations. Requests for proposals for research and development projects are published in official gazettes and technical journals. Such a project has to contain detailed descriptions regarding the setting of targets, levels of technology, cost accounting, development schedule, history of discovery and development involved, etc. Analyses are conducted into technology, economic risk, market, and environmental impact. Support by the German government for government-related projects is given in compliance with predetermined guidelines. The evaluation and selection of submitted proposals are performed by professionals of the project carrier level. In this paper, explanations are also given about contracts, management of progress, and evaluation. (NEDO)

  1. IT Project Management from a Systems Thinking Perspective

    NARCIS (Netherlands)

    van Eck, Pascal; Ponisio, Laura

    2008-01-01

    Purpose: We proposes a Systems Thinking approach to the study of IT project management and show how this approach helps project managers in controlling their projects. Systems Thinking is a holistic problem solving method in which system behaviour emerges from the interaction of system components.

  2. High-Lift Propeller System Configuration Selection for NASA's SCEPTOR Distributed Electric Propulsion Flight Demonstrator

    Science.gov (United States)

    Patterson, Michael D.; Derlaga, Joseph M.; Borer, Nicholas K.

    2016-01-01

    Although the primary function of propellers is typically to produce thrust, aircraft equipped with distributed electric propulsion (DEP) may utilize propellers whose main purpose is to act as a form of high-lift device. These \\high-lift propellers" can be placed upstream of wing such that, when the higher-velocity ow in the propellers' slipstreams interacts with the wing, the lift is increased. This technique is a main design feature of a new NASA advanced design project called Scalable Convergent Electric Propulsion Technology Operations Research (SCEPTOR). The goal of the SCEPTOR project is design, build, and y a DEP aircraft to demonstrate that such an aircraft can be much more ecient than conventional designs. This paper provides details into the high-lift propeller system con guration selection for the SCEPTOR ight demonstrator. The methods used in the high-lift propeller system conceptual design and the tradeo s considered in selecting the number of propellers are discussed.

  3. Selection of priority investment projects for the development of the Russian Arctic

    Science.gov (United States)

    Novoselov, A.; Potravny, I.; Novoselova, I.; Gassiy, V.

    2017-12-01

    In the Russian Arctic, there is currently an active process of preparation and implementation of investment projects aiming to extract natural resources, with the aim of sustainable socioeconomic development of the region. These projects are associated with the development of key zones in the Arctic and involve the exploration for and production of minerals (diamonds, gold, rare-earth metals, oil, and gas) and the development of energy and infrastructure (e.g., the Northern Sea Route). Such projects, which are often carried out in territories of traditional nature management belonging to the indigenous peoples of the North, must consider their environmental and social responsibility and the preservation of the ethnic identity and culture of indigenous peoples. The extraction of mineral deposits in the Arctic and the Far North places new demands on subsoil users, related to the preservation and development of the socio-cultural environment of the indigenous peoples of the North and to the ecological rehabilitation of the area. This article presents economic and mathematical models for selecting the optimal development project options based on the pairwise comparison of investment projects and the evaluation of indigenous peoples' preferences. We investigated the investment projects' impact on traditional territories in the Arctic, including the Republic of Sakha (Yakutia), in terms of socioeconomic and ethnological development, and environmental change. The suggested system of models can be used to assess the priority of projects supporting and developing the region in the mining corporation's area of responsibility. The proposed models are based on fuzzy set theory, which provides an effective assessment of the population's preferences for projects. Data are processed using the hierarchy analysis method and multivariate optimization calculations to determine the project sets at different funding levels. The creation of information-linked processing models is

  4. A model for selecting project team members using multicriteria group decision making

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-04-01

    Full Text Available Selecting a project team is a complex multi-criteria decision-making problem. For this reason, one appropriate way to tackle such problems involves the use of multi-criteria decision aid methods. However, most of the decisions taken regarding the selection of project teams are made by a group of people. It is this which changes the focus of the problem by moving from one decision-maker (DM to a group of DMs. Analysis needs to be extended in order to consider the preference structure of each individual group member. In this paper, we present a group decision model for project team selection based on a multi-criteria evaluation of the preferences of a client's representatives. It could be applied to any decision problem since it involves a group of decision makers whose preferences diverge little. An application of the model in order to select consultants for a construction project is presented.A seleção da equipe em um projeto é um problema de decisão multicritério. Uma forma apropriada de tratar tais problemas envolve o uso de métodos de apoio multicritério a decisão. Grande parte desses problemas envolve um grupo de decisores. Dessa forma, há uma mudança no foco da decisão de um decisor para um grupo de decisores. A análise deve ser ampliada no intuito de considerar a estrutura de preferência de cada membro do grupo. Nesse artigo, apresentamos um modelo aplicado à seleção de equipe de um projeto baseado na avaliação multicritério das preferências dos representantes do cliente do projeto. Pode ser aplicado a qualquer problema de decisão desde que envolva um grupo de decisores que tenham pequena divergência em relação às suas preferências. Uma aplicação para seleção de parte da equipe de um projeto de construção é apresentada.

  5. Map projections cartographic information systems

    CERN Document Server

    Grafarend, Erik W

    2006-01-01

    In the context of Geographical Information Systems (GIS) the book offers a timely review of map projections (sphere, ellipsoid, rotational surfaces) and geodetic datum transformations. For the needs of photogrammetry, computer vision, and remote sensing space projective mappings are reviewed.

  6. Project management and Enterprise systems

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2006-01-01

    Implementing and Operating integrated Enterprise Systems are a multidimensional effort. It seriously challenges the IT supplier as well as the professional service provider client. The paper discuss these issues in a project management perspective. A framework for supporting project management...

  7. UHP lamp systems for projection applications

    International Nuclear Information System (INIS)

    Derra, Guenther; Moench, Holger; Fischer, Ernst; Giese, Hermann; Hechtfischer, Ulrich; Heusler, Gero; Koerber, Achim; Niemann, Ulrich; Noertemann, Folke-Charlotte; Pekarski, Pavel; Pollmann-Retsch, Jens; Ritz, Arnd; Weichmann, Ulrich

    2005-01-01

    Projection systems have found widespread use in conference rooms and other professional applications during the last decade and are now entering the home TV market at a considerable pace. Projectors as small as about one litre are able to deliver several thousand screen lumens and are, with a system efficacy of over 10 lm W -1 , the most efficient display systems realized today. Short arc lamps are a key component for projection systems of the highest efficiency for small-size projection displays. The introduction of the ultra high performance (UHP) lamp system by Philips in 1995 can be identified as one of the key enablers of the commercial success of projection systems. The UHP lamp concept features outstanding arc luminance, a well suited spectrum, long life and excellent lumen maintenance. For the first time it combines a very high pressure mercury discharge lamp with extremely short and stable arc gap with a regenerative chemical cycle keeping the discharge walls free from blackening, leading to lifetimes of over 10 000 h. Since the introduction of the UHP lamp system, many important new technology improvements have been realized: burner designs for higher lamp power, advanced ignition systems, miniaturized electronic drivers and innovative reflector concepts. These achievements enabled the impressive increase of projector light output, a remarkable reduction in projector size and even higher optical efficiency in projection systems during the last years. In this paper the concept of the UHP lamp system is described, followed by a discussion of the technological evolution the UHP lamp has undergone so far. Last, but not least, the important improvements of the UHP lamp system including the electronic driver and the reflector are discussed. (review article)

  8. SELECTION OF PROJECT MANAGERS IN CONSTRUCTION FIRMS USING ANALYTIC HIERARCHY PROCESS (AHP AND FUZZY TOPSIS: A CASE STUDY

    Directory of Open Access Journals (Sweden)

    Fatemeh Torfi

    2011-10-01

    Full Text Available Selecting a project manager is a major decision for every construction company. Traditionally, a project manager is selected by interviewing applicants and evaluating their capabilities by considering the special requirements of the project. The interviews are usually conducted by senior managers, and the selection of the best candidate depends on their opinions. Thus, the results may not be completely reliable. Moreover, conducting interviews for a large group of candidates is time-consuming. Thus, there is a need for computational models that can be used to select the most suitable applicant, given the project specifications and the applicants’ details. In this paper, a case study is performed in which a Fuzzy Multiple Criteria Decision Making (FMCDM model is used to select the best candidate for the post of project manager in a large construction firm. First, with the opinions of the senior managers, all the criteria and sub-criteria required for the selection are gathered, and the criteria priorities are qualitatively specified. Then, the applicants are ranked using the Analytic Hierarchy Process (AHP, approximate weights of the criteria, and fuzzy technique for order performance by similarity to ideal solution (TOPSIS. The results of the case study are shown to be satisfactory.

  9. 76 FR 15961 - Funding Priorities and Selection Criterion; Disability and Rehabilitation Research Projects and...

    Science.gov (United States)

    2011-03-22

    ... priorities and a selection criterion for the Disability and Rehabilitation Research Projects and Centers... outcomes for underserved populations; (4) identify research gaps; (5) identify mechanisms of integrating research and practice; and (6) disseminate findings. This notice proposes two priorities and a selection...

  10. Network Insights for Partner Selection in Inter-Organisational New Product Development Projects

    DEFF Research Database (Denmark)

    Ruiz, Pedro Parraguez; Maier, Anja

    2016-01-01

    Selecting partners for new product development (NPD) is an important yet under-supported task. Thispaper focuses on decision-making support for the NPD collaboration stages of partner exploration andsearch. We provide a conceptual framework for a network-based platform to identify potential......: technologicalcloseness, relational closeness, geographical closeness and a set of organisational variables. In order toidentify a subset of new product development partners and aid the selection process, three characteristicsof NPD projects are considered as mediators of those success factors: the desired degree...... and illustrate with examples the networkbasedplatform to explore NPD partners. The developed framework and platform are part of Net-Sights,an ongoing research project to develop open-source decision-support tools for network insights. Thefirst version of this tool will soon be available as an online platform...

  11. Innovative Approach for IBS Vendor Selection Problem

    Directory of Open Access Journals (Sweden)

    Omar Mohd Faizal

    2016-01-01

    Full Text Available Supply chain management in Industrialised Building System (IBS construction management has significantly determined the successful of company and project performance. Due to the wide variety of criteria and vendor available, the vendor selection process for a specific project needs is becoming more difficult. The need of decision aid for vendor selection in other areas is widely discussed in previous research. However, study on vendor selection for IBS project is largely neglected. Decision Support System (DSS is proposed for this purpose. Yet, most of the DSS models are impractical since they are complicated and difficult for a layman such as project managers to use. Research indicates that the rapid development of ICT has highly potential towards simple and effective DSS. Thus, this paper highlights the importance and research approach for vendor selection in IBS project management. The study is based on Design Science Research Methodology with combination of case studies. It is anticipates that this study will yield an effective value-for-money decision making platform to manage vendor selection process.

  12. Engineered Geothermal System Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Petty, Susan

    2014-06-19

    In June 2009, AltaRock Energy began field work on a project supported by the U.S. Department of Energy entitled “Use of Multiple Stimulations to Improve Economics of Engineered Geothermal Systems in Shallow High Temperature Intrusives.” The goal of the project was to develop an Engineered Geothermal System (EGS) in the portion of The Geysers geothermal field operated by the Northern California Power Agency (NCPA). The project encountered several problems while deepening Well E-7 which culminated in the suspension of field activities in September 2009. Some of the problems encountered are particular to The Geysers area, while others might be encountered in any geothermal field, and they might be avoided in future operations.

  13. Selecting Map Projections in Minimizing Area Distortions in GIS Applications

    Directory of Open Access Journals (Sweden)

    Ahmet Kaya

    2008-12-01

    Full Text Available Varioussoftware for Geographical Information Systems (GISs have been developed and used in many different engineering projects. In GIS applications, map coverage is important in terms of performing reliable and meaningful queries. Map projections can be conformal, equal-area and equidistant. The goal of an application plays an important role in choosing one of those projections. Choosing the equal-area projection for an application in which area information is used (forestry, agriculture, ecosystem etc reduces the amount of distortion on the area, but many users using GIS ignore this fact and continue to use applications with present map sheets no matter in what map projection it is. For example, extracting area information from data whose country system’s map sheet is in conformal projection is relatively more distorted, compared to an equal-area projection one. The goal of this study is to make the best decision in choosing the most proper equal-area projection among the choices provided by ArcGIS 9.0, which is a popular GIS software package, and making a comparison on area errors when conformal projection is used. In this study, the area of parcels chosen in three different regions and geographic coordinates and whose sizes vary between 0.01 to 1,000,000 ha are calculated according to Transversal Mercator (TM, 3°, Universal Transversal Mercator (UTM, 6° and 14 different equal-area projections existing in the ArcGIS 9.0 GIS software package. The parcel areas calculated with geographical coordinates are accepted as definite. The difference between the sizes calculated according to projection coordinates and real sizes of the parcels are determined. Consequently, the appropriate projections are decided for the areas smaller and equal than 1,000 ha and greater than 1,000 ha in the GIS software package.

  14. 41 CFR 102-74.135 - Who selects construction and alteration projects that are to be performed?

    Science.gov (United States)

    2010-07-01

    ... and alteration projects that are to be performed? 102-74.135 Section 102-74.135 Public Contracts and... construction and alteration projects that are to be performed? The Administrator of General Services selects construction and alteration projects to be performed. ...

  15. Handbook of selected organ doses for projections common in pediatric radiology

    International Nuclear Information System (INIS)

    Rosenstein, M.; Beck, T.J.; Warner, G.G.

    1979-05-01

    This handbook contains data from which absorbed dose (mrad) to selected organs can be estimated for common projections in pediatric radiology. The organ doses are for three reference patients: a newborn (0 to 6 months), a 1-year old child, and a 5-year old child. One intent of the handbook is to permit the user to evaluate the effect on organ dose to these reference pediatric patients as a function of certain changes in technical parameters used in or among facilities. A second intent is to permit a comparison to be made of organ doses as a function of age. This comparison can be extended to a reference adult by referring to the previous Handbook of Selected Organ Doses fo Projections Common in Diagnostic Radiology, FDA 76-8031. Assignment of organ doses to individual pediatric patients using the Handbook data is not recommended unless the physical characteristics of the patient closely correlate with one of the three reference pediatric patients given in Appendix A

  16. Project Design Concept - Primary Ventilation System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    Tank Farm Restoration and Safe Operation (TFRSO), Project W-3 14 was established to provide upgrades that would improve the reliability and extend the system life of portions of the waste transfer, electrical, ventilation, instrumentation and control systems for the Hanford Site Tank Farms. An assessment of the tank farm system was conducted and the results are documented in system assessment reports. Based on the deficiencies identified in the tank farm system assessment reports, and additional requirements analysis performed in support of the River Protection Project (RPP), an approved scope for the TFRSO effort was developed and documented in the Upgrade Scope Summary Report (USSR), WHC-SD-W314-RPT-003, Rev. 4. The USSR establishes the need for the upgrades and identifies the specific equipment to be addressed by this project. This Project Design Concept (PDC) is in support of the Phase 2 upgrades and provides an overall description of the operations concept for the W-314 Primary Ventilation Systems. Actual specifications, test requirements, and procedures are not included in this PDC. The PDC is a ''living'' document, which will be updated throughout the design development process to provide a progressively more detailed description of the W-314 Primary Ventilation Systems design. The Phase 2 upgrades to the Primary Ventilation Systems shall ensure that the applicable current requirements are met for: Regulatory Compliance; Safety; Mission Requirements; Reliability; and Operational Requirements

  17. The utility of Geographical Information Systems (GIS) in systems-oriented obesity intervention projects: the selection of comparable study sites for a quasi-experimental intervention design--TX CORD.

    Science.gov (United States)

    Oluyomi, Abiodun O; Byars, Allison; Byrd-Williams, Courtney; Sharma, Shreela V; Durand, Casey; Hoelscher, Deanna M; Butte, Nancy F; Kelder, Steven H

    2015-02-01

    The Texas Childhood Obesity Research Demonstration project (TX CORD) uses a systems-oriented approach to address obesity that includes individual and family interventions, community-level action, as well as environmental and policy initiatives. Given that randomization is seldom possible in community-level intervention studies, TX CORD uses a quasi-experimental design. Comparable intervention and comparison study sites are needed to address internal validity bias. TX CORD was designed to be implemented in low-income, ethnically diverse communities in Austin and Houston, Texas. A three-stage Geographical Information System (GIS) methodology was used to establish and ascertain the comparability of the intervention and comparison study sites. Census tract (stage 1) and school (stage 2) data were used to identify spatially exclusive geographic areas that were comparable. In stage 3, study sites were compared on demographic characteristics, socioeconomic status (SES), food assets, and physical activity (PA) assets. Student's t-test was used to examine significant differences between the selected sites. The methodology that was used resulted in the selection of catchment areas with demographic and socioeconomic characteristics that fit the target population: ethnically diverse population; lower-median household income; and lower home ownership rates. Additionally, the intervention and comparison sites were statistically comparable on demographic and SES variables, as well as food assets and PA assets. This GIS approach can provide researchers, program evaluators, and policy makers with useful tools for both research and practice. Area-level information that allows for robust understanding of communities can enhance analytical procedures in community health research and offer significant contributions in terms of community assessment and engagement.

  18. Using automated environmental management information systems to enable compliance: Ten questions to answer before selecting a software system

    Energy Technology Data Exchange (ETDEWEB)

    Gilbert, J.B.

    1999-07-01

    As technology invades the arena of environmental information management, hundreds of software packages have become available in the marketplace. How does the already overwhelmed environmental manager or IT professional decide what's right for the organization? Is there a software package that meets the needs of the organization, and is there a successful way to implement the system? Does this require abandoning existing systems with which users are comfortable? Can the system really save time and/or money? This paper discusses three topics: What drives the need for a system; Ten questions to aid in selecting a system that is right for your organization; and enabling technology and software systems available today, and the future application of technology to environmental data management. Motivating factors for EMIS include regulatory, business and IT drivers. Because of the ever-increasing regulatory burden, the need to demonstrate compliance often is the strongest driver. But they cannot ignore business and IT drivers from the discussion, especially with issues such as Enterprise Resource Planning and The Year 2000 impacting many systems projects. Before selecting a system, the organization should address, at a minimum, the following ten issues: (1) Organization objectives; (2) Organization readiness; (3) High-level processes to be automated; (4) Integration and interfaces; (5) User community and needs; (6) Technical requirements; (7) Degree of customization; (8) Project timing; (9) Implementation resource needs; and (10) System justification. Today, there are hundreds of EH and S software packages available too help automate daily business processes. Only a few are multimedia packages, and all require significant implementation efforts. The EMIS market is still evolving, and software vendors continue to enhance product features and usability.

  19. Preliminary selection criteria for the Yucca Mountain Project waste package container material

    International Nuclear Information System (INIS)

    Halsey, W.G.

    1991-01-01

    The Department of Energy's Yucca Mountain Project (YMP) is evaluating a site at Yucca Mountain in Nevada for construction of a geologic repository for the storage of high-level nuclear waste. Lawrence Livermore National Laboratory's (LLNL) Nuclear Waste Management Project (NWMP) has the responsibility for design, testing, and performance analysis of the waste packages. The design is performed in an iterative manner in three sequential phases (conceptual design, advanced conceptual design, and license application design). An important input to the start of the advanced conceptual design is the selection of the material for the waste containers. The container material is referred to as the 'metal barrier' portion of the waste package, and is the responsibility of the Metal Barrier Selection and Testing task at LLNL. The selection will consist of several steps. First, preliminary, material-independent selection criteria will be established based on the performance goals for the container. Second, a variety of engineering materials will be evaluated against these criteria in a screening process to identify candidate materials. Third, information will be obtained on the performance of the candidate materials, and final selection criteria and quantitative weighting factors will be established based on the waste package design requirements. Finally, the candidate materials will be ranked against these criteria to determine whether they meet the mandated performance requirements, and to provide a comparative score to choose the material for advanced conceptual design activities. This document sets forth the preliminary container material selection criteria to be used in screening candidate materials. 5 refs

  20. Organ Donation European Quality System: ODEQUS project methodology.

    Science.gov (United States)

    Manyalich, M; Guasch, X; Gomez, M P; Páez, G; Teixeira, L

    2013-01-01

    Differences in the number of organ donors among hospitals cannot be explained only by the number of intensive care unit beds used or neurologic patients treated. The figures obtained are influenced by the organizational structure of the donation process and how efficient it is. The Organ Donation European Quality System (ODEQUS) is a 3-year project (from October 2010 to September 2013) co-financed by the European Agency for Health and Consumers (EAHC20091108) which aims to define a methodology to evaluate organ procurement performance at the hospital level. ODEQUS's specific objectives are to identify quality criteria and to develop quality indicators in three types of organ donation (after brain death, after cardiac death, and living donation). Those tools will be useful for hospitals' self-assessment as well as for developing an international auditing model. A consortium has been established involving 14 associated partners from Austria, Croatia, France, Germany, Italy, Poland, Portugal, Romania, Spain, Sweden, and the United Kingdom, as well as five collaborating partners from Greece, Hungary, Malta, Slovenia, and Turkey. The project has been established in three steps: 1) Design of a survey about the use of quality tools in a wide sample of European hospitals; 2) Development of quality criteria and quality indicators by the project experts. The main fields considered have been organizational structures, clinical procedures, and outcomes; and 3) Elaboration of an evaluation system to test the quality indicators in 11 European hospitals. Two types of training have been designed and performed: one concerns the development of quality criteria and quality indicators, whereas another is focused on how to use evaluation tools. Following this methodology, the project has so far identified 131 quality criteria and developed 31 quality indicators. Currently, the quality indicators are being tested in 11 selected hospitals. Copyright © 2013 Elsevier Inc. All rights

  1. Research on software systems dependability at the OECD Halden Reactor Project

    International Nuclear Information System (INIS)

    Sivertsen, Terje; Owre, Fridtjov

    2011-01-01

    Two central issues related to software systems dependability are those of safety integrity and safety demonstration. A proper understanding of these two issues are important for the selection of process, methods, techniques and tools to be used in the different life cycle phases of the software. Following a brief discussion on the concept of software safety integrity and its relationship to software systems dependability, this paper gives an introduction to research problems addressed by the OECD Halden Reactor Project within this area. The paper concludes with a discussion on the important role of safety demonstration in this context. (author)

  2. The 12-foot pressure wind tunnel restoration project model support systems

    Science.gov (United States)

    Sasaki, Glen E.

    1992-01-01

    The 12 Foot Pressure Wind Tunnel is a variable density, low turbulence wind tunnel that operates at subsonic speeds, and up to six atmospheres total pressure. The restoration of this facility is of critical importance to the future of the U.S. aerospace industry. As part of this project, several state of the art model support systems are furnished to provide an optimal balance between aerodynamic and operational efficiency parameters. Two model support systems, the Rear Strut Model Support, and the High Angle of Attack Model Support are discussed. This paper covers design parameters, constraints, development, description, and component selection.

  3. DECISION SUPPORT CONCEPT TO MANAGEMENT OF CONSTRUCTION PROJECTS - PROBLEM OF CONSTRUCTION SITE SELECTION

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2013-02-01

    Full Text Available The aim of this paper is to present Decision Support Concept (DSC for management of construction projects. Focus of our research is in application of multicritera methods (MCM to decision making in planning phase of construction projects (related to the problem of construction sites selection. The problem is identified as a significant one from many different aspects such as economic aspect, civil engineering aspect, etc. what indicates the necessity for evaluation of multiple sites by several different criteria. Therefore, DSC for construction site selection based on PROMETHEE method is designed. In order to define the appropriate criteria, their weights and preference functions for the concept, three groups of stakeholders are involved (investors, construction experts and experts for real estate market in its design. AHP method has been used for determination of criteria weights. The model has been tested on the problem of site selection for construction of residential-commercial building in four largest cities in Croatia.

  4. THE SYSTEM OF PROCESSES AND PROJECTS OF THE AIRCRAFT AIRWORTHINESS MAINTENANCE

    Directory of Open Access Journals (Sweden)

    Alexander A. Itskovich

    2018-01-01

    Full Text Available The concept of the aviation enterprise as a unified system of processes and projects of the aircraft airworthiness maintenance (AAM is presented. The relevance of project management tools usage, including the transport branch, is noted; the examples of successful implementation of the development projects at domestic enterprises manufacturing aircraft engines are given. A scheme for the classification of the AAM projects and processes, reflecting their interrelationship, is proposed. The operational activity of the enterprise is a combination of its business processes. The company selects plans and implements the relevant projects for the business processes optimization. At the same time, the projects themselves are the objects of management based on standardized processes. The processes of project management and the main processes of the enterprise are also interrelated and can be objects included in the unified regulations of its units. Increasing the efficiency of operational processes and processes of the aviation enterprise management is the goal of development projects, which are divided into investment projects and organizational changes projects.Limitation of organizational and financial resources of the company requires the identification and systematization of all projects and processes, while the application of project management standards allows to analyze the opportunities and to determine the sequence of their implementation. The importance of accumulating experience of completed projects is shown; the results can become typical methods for planning, organizing the implementation and monitoring of AAM projects. Specific forms of the project management standards implementation for AN-124-100 constructive modification project in LLC Volga-Dnepr Airlines are demonstrated: the control events plan and the project team formation.

  5. Bibliography of the SAIL Panama Canal Zone Project 2008 : a selected bibliography.

    OpenAIRE

    DeHart, Liz

    2009-01-01

    During the 18th Annual 2008 SAIL meeting at the Smithsonian Tropical Research Institute in Panama, Vielka Chang-Yau, librarian, mentioned the need to digitize and make available through the Aquatic Commons some of the early documents related to the U.S. biological survey of Panama from 1910 to 1912. With the assistance of SAIL, a regional marine librarian’s group, a digital project developed and this select bibliography represents the sources used for the project. It will assist research...

  6. Feature Subset Selection and Instance Filtering for Cross-project Defect Prediction - Classification and Ranking

    Directory of Open Access Journals (Sweden)

    Faimison Porto

    2016-12-01

    Full Text Available The defect prediction models can be a good tool on organizing the project's test resources. The models can be constructed with two main goals: 1 to classify the software parts - defective or not; or 2 to rank the most defective parts in a decreasing order. However, not all companies maintain an appropriate set of historical defect data. In this case, a company can build an appropriate dataset from known external projects - called Cross-project Defect Prediction (CPDP. The CPDP models, however, present low prediction performances due to the heterogeneity of data. Recently, Instance Filtering methods were proposed in order to reduce this heterogeneity by selecting the most similar instances from the training dataset. Originally, the similarity is calculated based on all the available dataset features (or independent variables. We propose that using only the most relevant features on the similarity calculation can result in more accurate filtered datasets and better prediction performances. In this study we extend our previous work. We analyse both prediction goals - Classification and Ranking. We present an empirical evaluation of 41 different methods by associating Instance Filtering methods with Feature Selection methods. We used 36 versions of 11 open source projects on experiments. The results show similar evidences for both prediction goals. First, the defect prediction performance of CPDP models can be improved by associating Feature Selection and Instance Filtering. Second, no evaluated method presented general better performances. Indeed, the most appropriate method can vary according to the characteristics of the project being predicted.

  7. Controlled Ecological Life Support System Breadboard Project - 1988

    Science.gov (United States)

    Knott, W. M.

    1989-01-01

    The Controlled Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989-1993 are listed. The biomass production chamber to be used by the project is described.

  8. Decision-making for the selection of sites and energy systems suited to Benin needs

    International Nuclear Information System (INIS)

    Semassou, Clarence

    2011-01-01

    The analysis of the wind sites and the solar possibilities of Benin led the works towards the energy systems, of the autonomous photovoltaic type, coupled with batteries of storage. These appropriate energy systems were analyzed, modelled and optimized. The criteria of optimization arise from a survey realized in near the persons in charge who take care of questions of electrification in rural areas, of selected professionals who play a major role in the decision-making of the projects of electrification in rural areas, local associations which benefited from these projects in Benin, from technicians and from users of these systems. These criteria are organized into a hierarchy according to the method AMDEC. A method of adapted optimization was realized; she appeals to an original vision of levelheadedness. (author) [fr

  9. Project W-049H Collection System Acceptance Test

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The Acceptance Test Procedure (ATP) Program for Project W-049H covers the following activities: Disposal system, Collection system, Instrumentation and control system. Each activity has its own ATP. The purpose of the ATPs is to verify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. This ATP has been prepared to demonstrate that the Collection System Instrumentation functions as required by project criteria

  10. An Approach for Implementation of Project Management Information Systems

    Science.gov (United States)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  11. Selecting practice management information systems.

    Science.gov (United States)

    Worley, R; Ciotti, V

    1997-01-01

    Despite enormous advances in information systems, the process by which most medical practices select them has remained virtually unchanged for decades: the request for proposal (RFP). Unfortunately, vendors have learned ways to minimize the value of RFP checklists to where purchasers now learn little about the system functionality. The authors describe a selection methodology that replaces the RFP with scored demos, reviews of vendor user manuals and mathematically structured reference checking. In a recent selection process at a major medical center, these techniques yielded greater user buy-in and favorable contract terms as well.

  12. Materials selection guidelines for geothermal energy utilization systems

    Energy Technology Data Exchange (ETDEWEB)

    Ellis, P.F. II; Conover, M.F.

    1981-01-01

    This manual includes geothermal fluid chemistry, corrosion test data, and materials operating experience. Systems using geothermal energy in El Salvador, Iceland, Italy, Japan, Mexico, New Zealand, and the United States are described. The manual provides materials selection guidelines for surface equipment of future geothermal energy systems. The key chemical species that are significant in determining corrosiveness of geothermal fluids are identified. The utilization modes of geothermal energy are defined as well as the various physical fluid parameters that affect corrosiveness. Both detailed and summarized results of materials performance tests and applicable operating experiences from forty sites throughout the world are presented. The application of various non-metal materials in geothermal environments are discussed. Included in appendices are: corrosion behavior of specific alloy classes in geothermal fluids, corrosion in seawater desalination plants, worldwide geothermal power production, DOE-sponsored utilization projects, plant availability, relative costs of alloys, and composition of alloys. (MHR)

  13. Selection of initial events of accelerator driven subcritical system

    International Nuclear Information System (INIS)

    Wang Qianglong; Hu Liqin; Wang Jiaqun; Li Yazhou; Yang Zhiyi

    2013-01-01

    The Probabilistic Safety Assessment (PSA) is an important tool in reactor safety analysis and a significant reference to the design and operation of reactor. It is the origin and foundation of the PSA for a reactor to select the initial events. Accelerator Driven Subcritical System (ADS) has advanced design characteristics, complicated subsystems and little engineering and operating experience, which makes it much more difficult to identify the initial events of ADS. Based on the current design project of ADS, the system's safety characteristics and special issues were analyzed in this article. After a series of deductions with Master Logic Diagram (MLD) and considering the relating experience of other advanced research reactors, a preliminary initial events was listed finally, which provided the foundation for the next safety assessment. (authors)

  14. Stakeholder-driven multi-attribute analysis for energy project selection under uncertainty

    International Nuclear Information System (INIS)

    Read, Laura; Madani, Kaveh; Mokhtari, Soroush; Hanks, Catherine

    2017-01-01

    In practice, selecting an energy project for development requires balancing criteria and competing stakeholder priorities to identify the best alternative. Energy source selection can be modeled as multi-criteria decision-maker problems to provide quantitative support to reconcile technical, economic, environmental, social, and political factors with respect to the stakeholders' interests. Decision making among these complex interactions should also account for the uncertainty present in the input data. In response, this work develops a stochastic decision analysis framework to evaluate alternatives by involving stakeholders to identify both quantitative and qualitative selection criteria and performance metrics which carry uncertainties. The developed framework is illustrated using a case study from Fairbanks, Alaska, where decision makers and residents must decide on a new source of energy for heating and electricity. We approach this problem in a five step methodology: (1) engaging experts (role players) to develop criteria of project performance; (2) collecting a range of quantitative and qualitative input information to determine the performance of each proposed solution according to the selected criteria; (3) performing a Monte-Carlo analysis to capture uncertainties given in the inputs; (4) applying multi-criteria decision-making, social choice (voting), and fallback bargaining methods to account for three different levels of cooperation among the stakeholders; and (5) computing an aggregate performance index (API) score for each alternative based on its performance across criteria and cooperation levels. API scores communicate relative performance between alternatives. In this way, our methodology maps uncertainty from the input data to reflect risk in the decision and incorporates varying degrees of cooperation into the analysis to identify an optimal and practical alternative. - Highlights: • We develop an applicable stakeholder-driven framework for

  15. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-420. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance. This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  16. Fringe-period selection for a multifrequency fringe-projection phase unwrapping method

    International Nuclear Information System (INIS)

    Zhang, Chunwei; Zhao, Hong; Jiang, Kejian

    2016-01-01

    The multi-frequency fringe-projection phase unwrapping method (MFPPUM) is a typical phase unwrapping algorithm for fringe projection profilometry. It has the advantage of being capable of correctly accomplishing phase unwrapping even in the presence of surface discontinuities. If the fringe frequency ratio of the MFPPUM is too large, fringe order error (FOE) may be triggered. FOE will result in phase unwrapping error. It is preferable for the phase unwrapping to be kept correct while the fewest sets of lower frequency fringe patterns are used. To achieve this goal, in this paper a parameter called fringe order inaccuracy (FOI) is defined, dominant factors which may induce FOE are theoretically analyzed, a method to optimally select the fringe periods for the MFPPUM is proposed with the aid of FOI, and experiments are conducted to research the impact of the dominant factors in phase unwrapping and demonstrate the validity of the proposed method. Some novel phenomena are revealed by these experiments. The proposed method helps to optimally select the fringe periods and detect the phase unwrapping error for the MFPPUM. (paper)

  17. An ANP-based approach for the selection of photovoltaic solar power plant investment projects

    International Nuclear Information System (INIS)

    Aragones-Beltran, P.; Pastor-Ferrando, J.P.; Rodriguez-Pozo, F.; Chaparro-Gonzalez, F.

    2010-01-01

    In this paper the Analytic Network Process (ANP) is applied to the selection of photovoltaic (PV) solar power projects. These projects follow a long management and execution process from plant site selection to plant start-up. As a consequence, there are many risks of time delays and even of project stoppage. In the case study presented in this paper a top manager of an important Spanish company that operates in the power market has to decide on the best PV project (from four alternative projects) to invest based on risk minimization. The manager identified 50 project execution delay and/or stoppage risks. The influences between the elements of the network (groups of risks and alternatives) were identified and analyzed using the ANP multicriteria decision analysis method. Two different ANP models were used: one hierarchy model (that considers AHP as a particular case of ANP) and one network-based model. The results obtained in each model were compared and analyzed. The main conclusion is that unlike the other models used in the study, the single network model can manage all the information of the real-world problem and thus it is the decision analysis model recommended by the authors. The strengths and weaknesses of ANP as a multicriteria decision analysis tool are also described in the paper. (author)

  18. Real-time operating system for selected Intel processors

    Science.gov (United States)

    Pool, W. R.

    1980-01-01

    The rationale for system development is given along with reasons for not using vendor supplied operating systems. Although many system design and performance goals were dictated by problems with vendor supplied systems, other goals surfaced as a result of a design for a custom system able to span multiple projects. System development and management problems and areas that required redesign or major code changes for system implementation are examined as well as the relative successes of the initial projects. A generic description of the actual project is provided and the ongoing support requirements and future plans are discussed.

  19. Information systems project management: methods, tools, and techniques

    OpenAIRE

    Mcmanus, John; Wood-Harper, Trevor

    2004-01-01

    Information Systems Project Management offers a clear and logical exposition of how to plan, organise and monitor projects effectively in order to deliver quality information systems within time, to budget and quality. This new book by John McManus and Trevor Wood-Harper is suitable for upper level undergraduates and postgraduates studying project management and Information Systems. Practising managers will also find it to be a valuable tool in their work. Managing information systems pro...

  20. The Utility of Geographical Information Systems (GIS) in Systems-Oriented Obesity Intervention Projects: The Selection of Comparable Study Sites for a Quasi-Experimental Intervention Design—TX CORD

    Science.gov (United States)

    Byars, Allison; Byrd-Williams, Courtney; Sharma, Shreela V.; Durand, Casey; Hoelscher, Deanna M.; Butte, Nancy F.; Kelder, Steven H.

    2015-01-01

    Abstract Background: The Texas Childhood Obesity Research Demonstration project (TX CORD) uses a systems-oriented approach to address obesity that includes individual and family interventions, community-level action, as well as environmental and policy initiatives. Given that randomization is seldom possible in community-level intervention studies, TX CORD uses a quasi-experimental design. Comparable intervention and comparison study sites are needed to address internal validity bias. Methods: TX CORD was designed to be implemented in low-income, ethnically diverse communities in Austin and Houston, Texas. A three-stage Geographical Information System (GIS) methodology was used to establish and ascertain the comparability of the intervention and comparison study sites. Census tract (stage 1) and school (stage 2) data were used to identify spatially exclusive geographic areas that were comparable. In stage 3, study sites were compared on demographic characteristics, socioeconomic status (SES), food assets, and physical activity (PA) assets. Student's t-test was used to examine significant differences between the selected sites. Results: The methodology that was used resulted in the selection of catchment areas with demographic and socioeconomic characteristics that fit the target population: ethnically diverse population; lower-median household income; and lower home ownership rates. Additionally, the intervention and comparison sites were statistically comparable on demographic and SES variables, as well as food assets and PA assets. Conclusions: This GIS approach can provide researchers, program evaluators, and policy makers with useful tools for both research and practice. Area-level information that allows for robust understanding of communities can enhance analytical procedures in community health research and offer significant contributions in terms of community assessment and engagement. PMID:25587670

  1. Competitiveness in organizational integrated computer system project management

    Directory of Open Access Journals (Sweden)

    Zenovic GHERASIM

    2010-06-01

    Full Text Available The organizational integrated computer system project management aims at achieving competitiveness by unitary, connected and personalised treatment of the requirements for this type of projects, along with the adequate application of all the basic management, administration and project planning principles, as well as of the basic concepts of the organisational information management development. The paper presents some aspects of organizational computer systems project management competitiveness with the specific reference to some Romanian companies’ projects.

  2. Project management system for the decommissioning of research reactors

    International Nuclear Information System (INIS)

    Park, J. H.

    2006-01-01

    KAERI has developed a computer information system, named DECOMMIS, for the project management with the increased effectiveness of the decommissioning projects and the record keeping for a next decommissioning project. The management system consists of three parts, code management system, data input system (DDIS) and data processing and output system (DDPS). Through the DDIS, the data can be directly inputted at sites and the system can play roles of daily work reports to minimize the time gap between the dismantling activities and the evaluation of the data for project management. The DDPS provides useful information to the staff for more effective project management and this information include several fields, such as project progress management, man power management, waste management, radiation dose of workers and so on. It is expected that the system would enable to maintain the decommissioning data, to prepare the source data for the R and D for development of planning tools and to give information to the staff for the decision on the progress of the projects. In this paper, the overall system will be briefly explained and several examples of the utilization, focused on the waste and manpower control, for the project management will be introduced

  3. A survey of the use of database management systems in accelerator projects

    CERN Document Server

    Poole, John

    1995-01-01

    The International Accelerator Database Group (IADBG) was set up in 1994 to bring together the people who are working with databases in accelerator laboratories so that they can exchange information and experience. The group now has members from more than 20 institutes from all around the world, representing nearly double this number of projects. This paper is based on the information gathered by the IADBG and describes why commercial DataBase Management Systems (DBMS) are being used in accelerator projects and what they are being used for. Initially introduced to handle equipment builders' data, commercial DBMS are now being used in almost all areas of accelerators from on-line control to personnel data. A variety of commercial systems are being used in conjunction with a diverse selection of application software for data maintenance/manipulation and controls. This paper reviews the database activities known to IADBG.

  4. Characteristics of Criteria for Selecting Investment Projects under Uncertainty

    Directory of Open Access Journals (Sweden)

    Adrian ENCIU

    2011-07-01

    Full Text Available Within financial theory and practice, there are used five main criteria for selecting investment projects: the net present value (NPV criterion, the internal rate of return (IRR criterion, the return term (RT criterion, the profitability ratio (PR criterion and the supplementary return (SR criterion. The assay will emphasize several new properties of said indexes for investment assessment, having as starting point the hypotheses of (approximately normal repartition of cash-flows generated by an investment project. The obtained results point to the fact that the NPV indexes (the analysis of this criterion was carried out in the article “The NPV Criterion for Valuing Investments under Uncertainty”, Daniel Armeanu, Leonard Lache, Economic Computation and Economic Cybernetics Studies and Research no. 4/2009, pp. 133-143, IRR, PR, RT and SR register normal repartitions, therefore simplifying the investment analysis under economic uncertainty, by the capacity of building confidence intervals and assessing probabilities for the inferior limits of said investment assessment indexes.

  5. ISSUES REGARDING THE FINANCIAL FLOW PROJECTIONS IN THE SELECTION OF INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    Mariana Rodica ŢÎRLEA

    2015-06-01

    Full Text Available For a company, through investment activities, it is followed to either create new abilities or expand the existing abilities, the partial or complete replacement of existing technical base or its modernization. In the condition that it is desired the creation of a technical base, the investment involves the purchase of fixed capital that can materialize in: buildings, special buildings, land, vehicles, facilities, equipment, etc. In terms of expansion and modernization, investment implies the existence of a material base on which should be intervened wholly or partly by its development or modernization. For the selection of investment projects in the context of investment strategy established at enterprise level through a Financial justification and prioritization of investments this should lead to the achievement of the objectives set at its level.

  6. Intelligent Materials Tracking System for Construction Projects Management

    Directory of Open Access Journals (Sweden)

    Narimah Kasim

    2015-05-01

    Full Text Available An essential factor adversely affecting the performance of construction projects is the improper handling of materials during site activities. In addition, paper-based reports are mostly used to record and exchange information related to the material components within the supply chain, which is problematic and inefficient. Generally, technologies (such as wireless systems and RFID are not being adequately used to overcome human errors and are not well integrated with project management systems to make tracking and management of materials easier and faster. Findings from a literature review and surveys showed that there is a lack of positive examples of such tools having been used effectively. Therefore, this research focused on the development of a materials tracking system that integrates RFID-based materials management with resources modelling to improve on-site materials tracking. Rapid prototyping was used to develop the system and testing of the system was carried out to examine the functionality and working appropriately. The proposed system is intended to promote the employment of RFID for automatic materials tracking with integration of resource modelling (Microsoft (R Office Project in the project management system in order to establish which of the tagged components are required resources for certain project tasks. In conclusion, the system provides an automatic and easy tracking method for managing materials during materials delivery and inventory management processes in construction projects.

  7. Decision support system to select cover systems

    International Nuclear Information System (INIS)

    Bostick, K.V.

    1995-01-01

    The objective of this technology is to provide risk managers with a defensible, objective way to select capping alternatives for remediating radioactive and mixed waste landfills. The process of selecting containment cover technologies for mixed waste landfills requires consideration of many complex and interrelated technical, regulatory, and economic issues. A Decision Support System (DSS) is needed to integrate the knowledge of experts from scientific, engineering, and management disciplines to help in selecting the best capping practice for the site

  8. An Internet-Based Accounting Information Systems Project

    Science.gov (United States)

    Miller, Louise

    2012-01-01

    This paper describes a student project assignment used in an accounting information systems course. We are now truly immersed in the internet age, and while many required accounting information systems courses and textbooks introduce database design, accounting software development, cloud computing, and internet security, projects involving the…

  9. The SIMPSONS project: An integrated Mars transportation system

    Science.gov (United States)

    Kaplan, Matthew; Carlson, Eric; Bradfute, Sherie; Allen, Kent; Duvergne, Francois; Hernandez, Bert; Le, David; Nguyen, Quan; Thornhill, Brett

    In response to the Request for Proposal (RFP) for an integrated transportation system network for an advanced Martian base, Frontier Transportation Systems (FTS) presents the results of the SIMPSONS project (Systems Integration for Mars Planetary Surface Operations Networks). The following topics are included: the project background, vehicle design, future work, conclusions, management status, and cost breakdown. The project focuses solely on the surface-to-surface transportation at an advanced Martian base.

  10. Benchmarking of nuclear reactors selected in the frame of GIF project

    International Nuclear Information System (INIS)

    Azpitarte, O; Villanueva, A; Ramos, R; Ramilo, L; Alvarez, M; Yorio, D; Herrero, V

    2012-01-01

    In this article a comparative assessment of the six reactor concepts selected in the frame of the Generation IV International Forum (GIF) project is presented. The assessment was carried out in the areas of Viability of the concept, Design and nuclear safety, Economics, Sustainability, Proliferation resistance, Nuclear fuel, Reprocessing, Materials and Balance of Plant, by means of qualification of chosen performance indicators (author)

  11. Optimized design of total energy systems: The RETE project

    Science.gov (United States)

    Alia, P.; Dallavalle, F.; Denard, C.; Sanson, F.; Veneziani, S.; Spagni, G.

    1980-05-01

    The RETE (Reggio Emilia Total Energy) project is discussed. The total energy system (TES) was developed to achieve the maximum quality matching on the thermal energy side between plant and user and perform an open scheme on the electrical energy side by connection with the Italian electrical network. The most significant qualitative considerations at the basis of the plant economic energy optimization and the selection of the operating criterion most fitting the user consumption characteristics and the external system constraints are reported. The design methodology described results in a TES that: in energy terms achieves a total efficiency evaluated on a yearly basis to be equal to about 78 percent and a fuel saving of about 28 percent and in economic terms allows a recovery of the investment required as to conventional solutions, in about seven years.

  12. A Hybrid Instance Selection Using Nearest-Neighbor for Cross-Project Defect Prediction

    Institute of Scientific and Technical Information of China (English)

    Duksan Ryu; Jong-In Jang; Jongmoon Baik; Member; ACM; IEEE

    2015-01-01

    Software defect prediction (SDP) is an active research field in software engineering to identify defect-prone modules. Thanks to SDP, limited testing resources can be effectively allocated to defect-prone modules. Although SDP requires suffcient local data within a company, there are cases where local data are not available, e.g., pilot projects. Companies without local data can employ cross-project defect prediction (CPDP) using external data to build classifiers. The major challenge of CPDP is different distributions between training and test data. To tackle this, instances of source data similar to target data are selected to build classifiers. Software datasets have a class imbalance problem meaning the ratio of defective class to clean class is far low. It usually lowers the performance of classifiers. We propose a Hybrid Instance Selection Using Nearest-Neighbor (HISNN) method that performs a hybrid classification selectively learning local knowledge (via k-nearest neighbor) and global knowledge (via na¨ıve Bayes). Instances having strong local knowledge are identified via nearest-neighbors with the same class label. Previous studies showed low PD (probability of detection) or high PF (probability of false alarm) which is impractical to use. The experimental results show that HISNN produces high overall performance as well as high PD and low PF.

  13. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  14. Orthogonality Measurement for Homogenous Projects-Bases

    Science.gov (United States)

    Ivan, Ion; Sandu, Andrei; Popa, Marius

    2009-01-01

    The homogenous projects-base concept is defined. Next, the necessary steps to create a homogenous projects-base are presented. A metric system is built, which then will be used for analyzing projects. The indicators which are meaningful for analyzing a homogenous projects-base are selected. The given hypothesis is experimentally verified. The…

  15. Identification of multi-criteria for supplier selection in IT project outsourcing

    Science.gov (United States)

    Fusiripong, Prashaya; Baharom, Fauziah; Yusof, Yuhanis

    2017-10-01

    In the increasing global business competitiveness, most organizations have attempted to determine the suitable external parties to support their core and non-core competency, particularly, in IT project outsourcing. The IT supplier selection is required to apply multi-criteria which comprised tangible criteria and intangible criteria in consider optimal IT supplier. Most researches attempted to identify optimal criteria for selecting IT supplier, however, the criteria cannot be the considered common criteria support the variety of IT outsourcing. Therefore, the study aimed to identify a common set of criteria being used in the various types of IT outsourcing. The common criteria are constructed by multi-criteria and success criteria, which were collected by literature review with comprehensive and comparative approach. Consequently, the researchers are able to identify a common set of criteria adopted in the variety of selection problem IT outsourcing supplier.

  16. Controlled ecological life support system breadboard project, 1988

    Science.gov (United States)

    Knott, W. M.

    1990-01-01

    The Closed Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989 to 1993 are listed. The Biomass Production Chamber (BPC) became operational and tests of wheat as a single crop are nearing completion.

  17. Use of a Knowledge Management System in Waste Management Projects

    International Nuclear Information System (INIS)

    Gruendler, D.; Boetsch, W.U.; Holzhauer, U.; Nies, R.A.

    2006-01-01

    In Germany the knowledge management system 'WasteInfo' about waste management and disposal issues has been developed and implemented. Beneficiaries of 'WasteInfo' are official decision makers having access to a large information pool. The information pool is fed by experts, so called authors This means compiling of information, evaluation and assigning of appropriate properties (metadata) to this information. The knowledge management system 'WasteInfo' has been introduced at the WM04, the operation of 'WasteInfo' at the WM05. The recent contribution describes the additional advantage of the KMS being used as a tool for the dealing with waste management projects. This specific aspect will be demonstrated using a project concerning a comparative analysis of the implementation of repositories in six countries using nuclear power as examples: The information of 'WasteInfo' is assigned to categories and structured according to its origin and type of publication. To use 'WasteInfo' as a tool for the processing the projects, a suitable set of categories has to be developed for each project. Apart from technical and scientific aspects, the selected project deals with repository strategies and policies in various countries, with the roles of applicants and authorities in licensing procedures, with safety philosophy and with socio-economic concerns. This new point of view has to be modelled in the categories. Similar to this, new sources of information such as local and regional dailies or particular web-sites have to be taken into consideration. In this way 'WasteInfo' represents an open document which reflects the current status of the respective repository policy in several countries. Information with particular meaning for the German repository planning is marked and by this may influence the German strategy. (authors)

  18. World Energy Projection System model documentation

    International Nuclear Information System (INIS)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA

  19. World Energy Projection System model documentation

    Energy Technology Data Exchange (ETDEWEB)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA.

  20. A New Dynamic Multicriteria Decision-Making Approach for Green Supplier Selection in Construction Projects under Time Sequence

    Directory of Open Access Journals (Sweden)

    Shi Yin

    2017-01-01

    Full Text Available Nowadays, due to the lack of natural resources and environment problems which have been appearing increasingly, green building is more and more involved in the construction industry. The evaluation and selection of green supplier are a significant part of the development of green building. In this paper, we propose a new dynamic multicriteria decision-making approach in construction projects under time sequence to deal with these problems. First, the paper establishes 4 main criteria and 17 subcriteria for green supplier selection in construction projects. Then, a method considering interaction between criteria and the influence of constructors subjective preference and objective criteria information is proposed. It uses the interval-valued intuitionistic fuzzy geometric weighted Heronian means (IVIFGWHM operator and multitarget nonlinear programming model to calculate the comprehensive evaluation results of potential green suppliers. The proposed method is much easier for constructors to select green supplier and make the localization of green supplier more practical and accurate in construction projects. Finally, a case study about a green building project is given to verify practicality and effectiveness of the proposed approach.

  1. Consonance in Information System Projects: A Relationship Marketing Perspective

    Science.gov (United States)

    Lin, Pei-Ying

    2010-01-01

    Different stakeholders in the information system project usually have different perceptions and expectations of the projects. There is seldom consistency in the stakeholders' evaluations of the project outcome. Thus the outcomes of information system projects are usually disappointing to one or more stakeholders. Consonance is a process that can…

  2. Auxiliary feedwater system risk-based inspection guide for the South Texas Project nuclear power plant

    International Nuclear Information System (INIS)

    Bumgardner, J.D.; Nickolaus, J.R.; Moffitt, N.E.; Gore, B.F.; Vo, T.V.

    1993-12-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. South Texas Project was selected as a plant for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by the NRC inspectors in preparation of inspection plans addressing AFW risk important components at the South Texas Project plant

  3. Project management in mine actions using Multi-Criteria-Analysis-based decision support system

    Directory of Open Access Journals (Sweden)

    Marko Mladineo

    2014-12-01

    Full Text Available In this paper, a Web-based Decision Support System (Web DSS, that supports humanitarian demining operations and restoration of mine-contaminated areas, is presented. The financial shortage usually triggers a need for priority setting in Project Management in Mine actions. As part of the FP7 Project TIRAMISU, a specialized Web DSS has been developed to achieve a fully transparent priority setting process. It allows stakeholders and donors to actively join the decision making process using a user-friendly and intuitive Web application. The main advantage of this Web DSS is its unique way of managing a mine action project using Multi-Criteria Analysis (MCA, namely the PROMETHEE method, in order to select priorities for demining actions. The developed Web DSS allows decision makers to use several predefined scenarios (different criteria weights or to develop their own, so it allows project managers to compare different demining possibilities with ease.

  4. Systems engineering real estate development projects

    Science.gov (United States)

    Gusakova, Elena; Titarenko, Boris; Stepanov, Vitaliy

    2017-10-01

    In recent years, real estate development has accumulated a wealth of experience in implementing major projects, which requires comprehension and systematization. The scientific instrument of system engineering is studied in the article and is substantively interpreted with reference to real estate development projects. The most perspective approaches and models are substantiated, allowing strategically to plan the life cycle of the project as a whole, and also to solve the engineering butt problems of the project. The relevance of further scientific studies of regularities and specifics of the life cycle of real estate development projects conducted at the Moscow State University of Economics and Management at the ISTA department is shown.

  5. Laser display system for multi-depth screen projection scenarios.

    Science.gov (United States)

    La Torre, J Pablo; Mayes, Nathan; Riza, Nabeel A

    2017-11-10

    Proposed is a laser projection display system that uses an electronically controlled variable focus lens (ECVFL) to achieve sharp and in-focus image projection over multi-distance three-dimensional (3D) conformal screens. The system also functions as an embedded distance sensor that enables 3D mapping of the multi-level screen platform before the desired laser scanned beam focused/defocused projected spot sizes are matched to the different localized screen distances on the 3D screen. Compared to conventional laser scanning and spatial light modulator (SLM) based projection systems, the proposed design offers in-focus non-distorted projection over a multi-distance screen zone with varying depths. An experimental projection system for a screen depth variation of 65 cm is demonstrated using a 633 nm laser beam, 3 KHz scan speed galvo-scanning mirrors, and a liquid-based ECVFL. As a basic demonstration, an in-house developed MATLAB based graphic user interface is deployed to work along with the laser projection display, enabling user inputs like text strings or predefined image projection. The user can specify projection screen distance, scanned laser linewidth, projected text font size, projected image dimensions, and laser scanning rate. Projected images are shown highlighting the 3D control capabilities of the display, including the production of a non-distorted image onto two-depths versus a distorted image via dominant prior-art projection methods.

  6. Sensor Selection and Data Validation for Reliable Integrated System Health Management

    Science.gov (United States)

    Garg, Sanjay; Melcher, Kevin J.

    2008-01-01

    For new access to space systems with challenging mission requirements, effective implementation of integrated system health management (ISHM) must be available early in the program to support the design of systems that are safe, reliable, highly autonomous. Early ISHM availability is also needed to promote design for affordable operations; increased knowledge of functional health provided by ISHM supports construction of more efficient operations infrastructure. Lack of early ISHM inclusion in the system design process could result in retrofitting health management systems to augment and expand operational and safety requirements; thereby increasing program cost and risk due to increased instrumentation and computational complexity. Having the right sensors generating the required data to perform condition assessment, such as fault detection and isolation, with a high degree of confidence is critical to reliable operation of ISHM. Also, the data being generated by the sensors needs to be qualified to ensure that the assessments made by the ISHM is not based on faulty data. NASA Glenn Research Center has been developing technologies for sensor selection and data validation as part of the FDDR (Fault Detection, Diagnosis, and Response) element of the Upper Stage project of the Ares 1 launch vehicle development. This presentation will provide an overview of the GRC approach to sensor selection and data quality validation and will present recent results from applications that are representative of the complexity of propulsion systems for access to space vehicles. A brief overview of the sensor selection and data quality validation approaches is provided below. The NASA GRC developed Systematic Sensor Selection Strategy (S4) is a model-based procedure for systematically and quantitatively selecting an optimal sensor suite to provide overall health assessment of a host system. S4 can be logically partitioned into three major subdivisions: the knowledge base, the down-select

  7. Spent Nuclear Fuel project systems engineering management plan

    International Nuclear Information System (INIS)

    Womack, J.C.

    1995-01-01

    The purpose of the WHC Systems Engineering Management Plan (SEMP) is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices to enhance the WHC engineering management of the SNF Project. The scope of the SEMP encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project. This implementation applies to, and is tailored to the needs of the SNF project and all its subprojects, including all current and future subprojects

  8. Focusing Information Systems Post-Graduate Research Projects

    Directory of Open Access Journals (Sweden)

    Gail Ridley

    1996-11-01

    Full Text Available This paper reports on an investigation of mechanisms that assist Information Systems post-graduate research students to focus their projects. An evaluation is presented of the experiences of Information Systems research students in focussing their research projects based on a survey conducted of students who participated in two of the first three Information Systems doctoral consortia to be held in Australia. The survey sought to determine whether a doctoral consortium or 'systematic expert review' is the most valuable mechanism for focussing a research proposal. Systematic expert review was considered by the students to be more effective than the doctoral consortium process for the purpose of focussing their research project proposals.

  9. Tank waste remediation system characterization project quality policies. Revision 1

    International Nuclear Information System (INIS)

    Trimble, D.J.

    1995-01-01

    These Quality Policies (QPs) describe the Quality Management System of the Tank Waste Characterization Project (hereafter referred to as the Characterization Project), Tank Waste Remediation System (TWRS), Westinghouse Hanford Company (WHC). The Quality Policies and quality requirements described herein are binding on all Characterization Project organizations. To achieve quality, the Characterization Project management team shall implement this Characterization Project Quality Management System

  10. Projective measurements in quantum and classical optical systems

    CSIR Research Space (South Africa)

    Roux, FS

    2014-09-01

    Full Text Available equally well to both classical and quantum optical systems. A projective measurement, in the context of quantum mechanics, is understood to be the process where a projection operator operates on some input state. Often this projection operator is composed...) Projective measurements in quantum and classical optical systems Filippus S. Roux* and Yingwen Zhang CSIR National Laser Centre, P.O. Box 395, Pretoria 0001, South Africa (Received 3 July 2014; published 22 September 2014) Experimental setups for the optical...

  11. Understanding the costs and schedule of hydroelectric projects

    International Nuclear Information System (INIS)

    Merrow, E.W.; Schroeder, B.R.

    1991-01-01

    This paper is based on a study conducted for the World Bank which evaluated the feasibility of developing an empirically based ex ante project analysis system for hydroelectric projects. The system would be used to assess: the reasonableness of engineering-based cost and schedule estimates used for project appraisal and preliminary estimates used to select projects for appraisal; and the potential for cost growth and schedule slip. The system would help identify projects early in the project appraisal process that harbor significantly higher than normal risks of overrunning cost and schedule estimates

  12. Identifying inaccuracy of MS Project using system analysis

    Science.gov (United States)

    Fachrurrazi; Husin, Saiful; Malahayati, Nurul; Irzaidi

    2018-05-01

    The problem encountered in project owner’s financial accounting report is the difference in total project costs of MS Project to the Indonesian Standard (Standard Indonesia Standard / Cost Estimating Standard Book of Indonesia). It is one of the MS Project problems concerning to its cost accuracy, so cost data cannot be used in an integrated way for all project components. This study focuses on finding the causes of inaccuracy of the MS Projects. The aim of this study, which is operationally, are: (i) identifying cost analysis procedures for both current methods (SNI) and MS Project; (ii) identifying cost bias in each element of the cost analysis procedure; and (iii) analysing the cost differences (cost bias) in each element to identify what the cause of inaccuracies in MS Project toward SNI is. The method in this study is comparing for both the system analysis of MS Project and SNI. The results are: (i) MS Project system in Work of Resources element has limitation for two decimal digits only, have led to its inaccuracy. Where the Work of Resources (referred to as effort) in MS Project represents multiplication between the Quantities of Activities and Requirements of resources in SNI; (ii) MS Project and SNI have differences in the costing methods (the cost estimation methods), in which the SNI uses the Quantity-Based Costing (QBC), meanwhile MS Project uses the Time-Based Costing (TBC). Based on this research, we recommend to the contractors who use SNI should make an adjustment for Work of Resources in MS Project (with correction index) so that it can be used in an integrated way to the project owner’s financial accounting system. Further research will conduct for improvement the MS Project as an integrated tool toward all part of the project participant.

  13. The HGF strategy project

    International Nuclear Information System (INIS)

    Knebel, J.U.; Fellmoser, F.; Lefhalm, C.; Mack, K.; Pettan, C.; Piecha, H.; Konys, J.; Adelhelm, C.; Glasbrenner, H.; Muscher, H.; Novotny, J.; Voss, Z.; Wedemeyer, O.; Mueller, G.; Heinzel, A.; Schumacher, G.; Huber, R.; Zimmermann, F.; Groetzbach, G.; Dorr, B.; Carteciano, L.N.

    2000-01-01

    Within the Hermann von Helmholtz-Gemeinschaft Deutscher Forschungszentren (HGF) an HGF-Strategy Fund Project entitled 'Innovative Technologies to Reduce Radiotoxicity' is funded since October 1999. The objectives of this HGF-Strategy Fund Project is the development of new methods and technologies to design and manufacture thin-walled and highly thermally-loaded surfaces which are cooled by a corrosive heavy liquid metal (lead-bismuth eutectic). The result of this project will be the basic scientific-technical tool which allows the conception and the design of a European Demonstrator of an ADS system (cf. 32.23.05). The work performed at Forschungszentrum Karlsruhe is embedded in a broad European research and development programme on ADS systems. The project is divided in three sub-projects: Sub-Project 1: Thermalhydraulic Investigations, Sub-Project 2: Material Specific Investigations, Sub-Project 3: Oxygen Control System. This progress report gives a general description of the project and its envisaged objectives. As a selection of the results achieved, first, FLUTAN calculations for the COULI beam window design and, second, the oxygen control system for the KArlsruhe Lead LAboratory KALLA are described in detail. Finally, the design and status of KALLA is given. (orig.)

  14. Integrating workflow and project management systems for PLM applications

    Directory of Open Access Journals (Sweden)

    Fabio Fonseca Pereira de Paula

    2008-07-01

    Full Text Available The adoption of Product Life-cycle Management Systems (PLMs concept is fundamental to improve the product development, mainly to small and medium enterprises (SMEs. One of the challenges is the integration between project management and product data management functions. The paper presents an analysis of the potential integration strategies for a specifics product data management system (SMARTEAM and a project management system (Microsoft Project, which are commonly used for SMEs. Finally the article presents some considerations about the study of Project Management solutions in SMB’s companies, considering the PLM approach. Key-words: integration, project management (PM, workflow, PDM, PLM.

  15. Comparative analysis of the current payment system for hospital services in Serbia and projected payments under diagnostic related groups system in urology.

    Science.gov (United States)

    Babić, Uroš; Soldatović, Ivan; Vuković, Dejana; Milićević, Milena Šantrić; Stjepanović, Mihailo; Kojić, Dejan; Argirović, Aleksandar; Vukotić, Vinka

    2015-03-01

    Global budget per calendar year is a traditional method of funding hospitals in Serbia. Diagnose related groups (DGR) is a method of hospital payment based on classification of patients into groups with clinically similar problems and similar utilization of hospital resources. The aim of this study was to compare current methods of hospital services payment with the projected costs by DRG payment method in urology. The data were obtained from the information system used in the Clinical Hospital Center "Dr. Dragiša Mišović"--Dedinje in Belgrade, Serbia. The implemented hospital information system was the main criterion for selection of healthcare institutions. The study included 994 randomly selected patients treated surgically and conservatively in 2012. Average costs under the current payment method were slightly higher than those projected by DRG, however, the variability was twice as high (54,111 ± 69,789 compared to 53,434 ± 32,509, p payment method as well as with the projected one by DRG was observed in relation to the number of days of hospitalization (ρ = 0.842, p payment system (β = 0.843, p payment system (β = 0.737, p payment method and the pro- jected DRG payment methods (β = 0.501, p Payment under the DRG system is administratively more complex because it requires detailed and standardized coding of diagnoses and procedures, as well as the information on the average consumption of resources (costs) per DRG. Given that aggregate costs of treatment under two hospital payment methods compared in the study are not significantly different, the focus on minor surgeries both under the current hospital payment method and under the introduced DRG system would be far more cost-effective for a hospital as great variations in treatment performance (reductions of days of hospitalization and complications), and consequently invoiced amounts would be reduced.

  16. Project of neural network for steel grade selection with the assumed CCT diagram

    OpenAIRE

    S. Malara; L.A. Dobrzański; J. Trzaska

    2008-01-01

    Purpose: The aim of this paper was developing a project of neural network for selection of steel grade with the specified CCT diagram – structure and of harness after heat treatment.Design/methodology/approach: The goal has been achieved in the following stages: at the first stage characteristic points of CCT diagram have been determined. At the second stage neural network has been developed and optimized.Findings: The neural network was developed in this paper, that allowed selection of stee...

  17. Cultivation of students' engineering designing ability based on optoelectronic system course project

    Science.gov (United States)

    Cao, Danhua; Wu, Yubin; Li, Jingping

    2017-08-01

    We carry out teaching based on optoelectronic related course group, aiming at junior students majored in Optoelectronic Information Science and Engineering. " Optoelectronic System Course Project " is product-designing-oriented and lasts for a whole semester. It provides a chance for students to experience the whole process of product designing, and improve their abilities to search literature, proof schemes, design and implement their schemes. In teaching process, each project topic is carefully selected and repeatedly refined to guarantee the projects with the knowledge integrity, engineering meanings and enjoyment. Moreover, we set up a top team with professional and experienced teachers, and build up learning community. Meanwhile, the communication between students and teachers as well as the interaction among students are taken seriously in order to improve their team-work ability and communicational skills. Therefore, students are not only able to have a chance to review the knowledge hierarchy of optics, electronics, and computer sciences, but also are able to improve their engineering mindset and innovation consciousness.

  18. Overview of the system alone and system/CFD coupled calculations of the PHENIX Natural Circulation Test within the THINS project

    Energy Technology Data Exchange (ETDEWEB)

    Pialla, David, E-mail: david.pialla@cea.fr [Commissariat à l’Energie Atomique et aux Energies Alternatives (CEA), DEN/DM2S/STMF, 17 rue des martyrs, 38054 Grenoble Cedex 9 (France); Tenchine, Denis [Commissariat à l’Energie Atomique et aux Energies Alternatives (CEA), DEN/DM2S/STMF, 17 rue des martyrs, 38054 Grenoble Cedex 9 (France); Li, Simon [Commissariat à l’Energie Atomique et aux Energies Alternatives (CEA), DEN/DM2S/STMF, 91191 Gif-sur-Yvette Cedex (France); Gauthe, Paul; Vasile, Alfredo [Commissariat à l’Energie Atomique et aux Energies Alternatives (CEA), DEN/DER/SESI, 13108 Saint Paul Lez Durance Cedex (France); Baviere, Roland; Tauveron, Nicolas; Perdu, Fabien [Commissariat à l’Energie Atomique et aux Energies Alternatives (CEA), DEN/DM2S/STMF, 17 rue des martyrs, 38054 Grenoble Cedex 9 (France); Maas, Ludovic; Cocheme, François [Institut de Radioprotection et de Sûreté Nucléaire (IRSN), PSN/SEMIA/BAST, B.P. 17, 92262 Fontenay-aux-Roses Cedex (France); Huber, Klaus; Cheng, Xu [Karlsruhe Institute of Technology (KIT), Institute of Fusion and Reactor Technology (IFRT), Kaiserstraße 12, Building 07.08, 76131 Karlsruhe (Germany)

    2015-08-15

    Highlights: • The PHENIX natural convection test performed during the end of life tests program. • The calculation with system codes and theirs limits. • The calculation with coupling CFD and system code, which allows better prediction. • The tasks of code validation have been done in the frame of the THINS project. - Abstract: The PHENIX sodium cooled fast reactor started operation in 1973 and was shut down in 2009. Before decommissioning, an ultimate test program was designed and performed to provide valuable data for the development of future sodium cooled fast reactors, as the so-called Astrid prototype in France. Among these ultimate tests, a thermal-hydraulic Natural Convection Test (NCT) was set-up in June 2009. Starting from a reduced power state of 120 MWt, the NCT consists of a loss of the heat sink combined with a reactor scram and a primary pumps trip leading to stabilized natural circulation in the primary sodium system. The thermal-hydraulics innovative system project (THINS project), sponsored by the European Community in the frame of the 7th FP has selected this transient for validation of both stand-alone system code simulations and coupled simulations using system and CFD codes. Participants from three organizations (CEA, IRSN and KIT) have addressed this transient using different system codes (CATHARE, DYN2B and ATHLET) and CFD codes (TRIO-U and OPEN FOAM). The present paper depicts the different modeling approaches, methodologies and compares the numerical results with the available experimental data. Finally, the main lessons learned from the work performed within the THINS project on the PHENIX NCT with respect to code development and validation are summarized.

  19. Comparative analysis of current payment system for hospital services in Serbia and projected payments under diagnostic related groups system in urology

    Directory of Open Access Journals (Sweden)

    Babić Uroš

    2015-01-01

    Full Text Available Background/Aim. Global budget per calendar year is a traditional method of funding hospitals in Serbia. Diagnose related groups (DGR is a method of hospital payment based on classification of patients into groups with clinically similar problems and similar utilization of hospital resources. The aim of this study was to compare current methods of hospital services payment with the projected costs by DRG payment method in urology. Methods. The data were obtained from the information system used in the Clinical Hospital Center “Dr. Dragiša Mišović” - Dedinje in Belgrade, Serbia. The implemented hospital information system was the main criterion for selection of healthcare institutions. The study included 994 randomly selected patients treated surgically and conservatively in 2012. Results. Average costs under the current payment method were slightly higher than those projected by DRG, however, the variability was twice as high (54,111 ± 69,789 compared to 53,434 ± 32,509, p < 0,001 respectively. The univariate analysis showed that the highest correlation with the current payment method as well as with the projected one by DRG was observed in relation to the number of days of hospitalization (ρ = 0.842, p < 0.001, and ρ = 0.637, p < 0.001, respectively. Multivariate regression models confirmed the influence of the number of hospitalization days to costs under the current payment system (β = 0.843, p < 0.001 as well as under the projected DRG payment system (β = 0.737, p < 0.001. The same predictor was crucial for the difference in the current payment method and the projected DRG payment methods (β = 0.501, p <0.001. Conclusion. Payment under the DRG system is administratively more complex because it requires detailed and standardized coding of diagnoses and procedures, as well as the information on the average consumption of resources (costs per DRG. Given that aggregate costs of treatment under two hospital payment methods compared

  20. Cornell University remote sensing program. [selected research projects in land and water resource management

    Science.gov (United States)

    Liang, T.; Belcher, D. J.; Mcnair, A. J.

    1974-01-01

    The major activities of the program staff from December 1, 1973 to May 31, 1974 are reported and include: (1) communication and instruction; (2) data and facilities; (3) research completed; (4) research in progress; (5) selected correspondence; (6) grant sponsored travel; and (7) seminars and newsletters. Detailed information and maps are given for the following selected projects: (1) ERTS mapping of waterways in the Tug Hill region of New York State; (2) photo-archeological investigation of Great Gully, New York; and (3) evaluation of selected highway impacts using aerial photography.

  1. Collaboration and Virtualization in Large Information Systems Projects

    Directory of Open Access Journals (Sweden)

    Stefan Ioan NITCHI

    2009-01-01

    Full Text Available A project is evolving through different phases from idea and conception until the experiments, implementation and maintenance. The globalization, the Internet, the Web and the mobile computing changed many human activities, and in this respect, the realization of the Information System (IS projects. The projects are growing, the teams are geographically distributed, and the users are heterogeneous. In this respect, the realization of the large Information Technology (IT projects needs to use collaborative technologies. The distribution of the team, the users' heterogeneity and the project complexity determines the virtualization. This paper is an overview of these aspects for large IT projects. It shortly present a general framework developed by the authors for collaborative systems in general and adapted to collaborative project management. The general considerations are illustrated on the case of a large IT project in which the authors were involved.

  2. GIS (Geographic Information Systems) based automatic tool for selection of gas pipeline corridors

    Energy Technology Data Exchange (ETDEWEB)

    Matos, Denise F.; Menezes, Paulo Cesar P.; Paz, Luciana R.L.; Garcia, Katia C.; Cruz, Cristiane B.; Pires, Silvia H.M.; Damazio, Jorge M.; Medeiros, Alexandre M.

    2009-07-01

    This paper describes a methodology developed to build total accumulated surfaces in order to better select gas pipelines corridor alternatives. The methodology is based on the minimization of negative impacts and the use of Geographic Information Systems (GIS), allowing an automatic method of construction, evaluation and selection of alternatives, that will contribute to the decision making process. It is important to emphasize that this paper follows the assumptions presented on the research reports of a project sponsored by the Ministry of Mines and Energy (MME) and elaborated at the Electric Power Research Center (CEPEL), called 'Development of a Geographic Information System to Oil and Gas Sectors in Brazil', and also the studies d GTW Project (Gas to Wire). Gas pipelines, as for their linear characteristic, may cross a variety of habitats and settlements, increasing the complexity of their environmental management. Considering this reality, this paper presents a methodology that takes into account different environmental criteria (layers), according to the area impacted. From the synthesis of the criteria it is presented the total accumulated surface. It is showed an example of a hypothetical gas pipeline connection between two points using the total accumulated surface. To select the 'impact scores' of the features, the gas pipeline was considered as a linear feature, but the result is a region, formed by pixels, each pixel with an accumulated impact score lower than some arbitrary measure. This region is called 'corridor', and it is the final result obtained using the proposed methodology. (author)

  3. Selected Examples of LDRD Projects Supporting Test Ban Treaty Verification and Nonproliferation

    Energy Technology Data Exchange (ETDEWEB)

    Jackson, K. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Al-Ayat, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Walter, W. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-02-23

    The Laboratory Directed Research and Development (LDRD) Program at the DOE National Laboratories was established to ensure the scientific and technical vitality of these institutions and to enhance the their ability to respond to evolving missions and anticipate national needs. LDRD allows the Laboratory directors to invest a percentage of their total annual budget in cutting-edge research and development projects within their mission areas. We highlight a selected set of LDRD-funded projects, in chronological order, that have helped provide capabilities, people and infrastructure that contributed greatly to our ability to respond to technical challenges in support of test ban treaty verification and nonproliferation.

  4. Technique Selectively Represses Immune System

    Science.gov (United States)

    ... Research Matters December 3, 2012 Technique Selectively Represses Immune System Myelin (green) encases and protects nerve fibers (brown). A new technique prevents the immune system from attacking myelin in a mouse model of ...

  5. Optimal fringe angle selection for digital fringe projection technique.

    Science.gov (United States)

    Wang, Yajun; Zhang, Song

    2013-10-10

    Existing digital fringe projection (DFP) systems mainly use either horizontal or vertical fringe patterns for three-dimensional shape measurement. This paper reveals that these two fringe directions are usually not optimal where the phase change is the largest to a given depth variation. We propose a novel and efficient method to determine the optimal fringe angle by projecting a set of horizontal and vertical fringe patterns onto a step-height object and by further analyzing two resultant phase maps. Experiments demonstrate the existence of the optimal angle and the success of the proposed optimal angle determination method.

  6. Optimized application of systems engineering to nuclear waste repository projects

    International Nuclear Information System (INIS)

    Miskimin, P.A.; Shepard, M.

    1986-01-01

    The purpose of this presentation is to describe a fully optimized application of systems engineering methods and philosophy to the management of a large nuclear waste repository project. Knowledge gained from actual experience with the use of the systems approach on two repository projects is incorporated in the material presented. The projects are currently evaluating the isolation performance of different geologic settings and are in different phases of maturity. Systems engineering methods were applied by the principal author at the Waste Isolation Pilot Plant (WIPP) in the form of a functional analysis. At the Basalt Waste Isolation Project (BWIP), the authors assisted the intergrating contractor with the development and application of systems engineering methods. Based on this experience and that acquired from other waste management projects, an optimized plan for applying systems engineering techniques was developed. The plan encompasses the following aspects: project organization, developing and defining requirements, assigning work responsibilities, evaluating system performance, quality assurance, controlling changes, enhancing licensability, optimizing project performance, and addressing regulatory issues. This information is presented in the form of a roadmap for the practical application of system engineering principles to a nuclear waste repository project

  7. World energy projection system: Model documentation

    Science.gov (United States)

    1992-06-01

    The World Energy Project System (WEPS) is an accounting framework that incorporates projects from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product) and about the rate of incremental energy requirements met by hydropower, geothermal, coal, and natural gas to produce projections of world energy consumption published annually by the Energy Information Administration (EIA) in the International Energy Outlook (IEO). Two independently documented models presented in Figure 1, the Oil Market Simulation (OMS) model and the World Integrated Nuclear Evaluation System (WINES), provide projections of oil and nuclear power consumption published in the IEO. Output from a third independently documented model, and the International Coal Trade Model (ICTM), is not published in the IEO but is used in WEPS as a supply check on projections of world coal consumption produced by WEPS and published in the IEO. A WEPS model of natural gas production documented in this report provides the same type of implicit supply check on the WEPS projections of world natural gas consumption published in the IEO. Two additional models are included in Figure 1, the OPEC Capacity model and the Non-OPEC Oil Production model. These WEPS models provide inputs to the OMS model and are documented in this report.

  8. World energy projection system: Model documentation

    International Nuclear Information System (INIS)

    1992-06-01

    The World Energy Project System (WEPS) is an accounting framework that incorporates projects from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product) and about the rate of incremental energy requirements met by hydropower, geothermal, coal, and natural gas to produce projections of world energy consumption published annually by the Energy Information Administration (EIA) in the International Energy Outlook (IEO) (Figure 1). Two independently documented models presented in Figure 1, the Oil Market Simulation (OMS) model and the World Integrated Nuclear Evaluation System (WINES) provide projections of oil and nuclear power consumption published in the IEO. Output from a third independently documented model, and the International Coal Trade Model (ICTM), is not published in the IEO but is used in WEPS as a supply check on projections of world coal consumption produced by WEPS and published in the IEO. A WEPS model of natural gas production documented in this report provides the same type of implicit supply check on the WEPS projections of world natural gas consumption published in the IEO. Two additional models are included in Figure 1, the OPEC Capacity model and the Non-OPEC Oil Production model. These WEPS models provide inputs to the OMS model and are documented in this report

  9. TA-55 facility control system upgrade project - human-system interface functional requirements

    International Nuclear Information System (INIS)

    Atkins, W.H.; Pope, N.G.; Turner, W.J.; Brown, R.E.

    1995-11-01

    The functional requirements for that part of the Technical Area (TA)-55 Operations Center Upgrade Project that involves the human-system interface (HSI) are described in this document. The upgrade project seeks to replace completely the center's existing computerized data acquisition and display system, which consists of the field multiplexer units, Data General computer systems, and associated peripherals and software. The upgrade project has two parts-the Facility Data Acquisition Interface System (FDAIS) and the HSI. The HSI comprises software and hardware to provide a high-level graphical operator interface to the data acquisition system, as well as data archiving, alarm annunciation, and logging. The new system will be built with modern, commercially available components; it will improve reliability and maintainability, and it can be expanded for future needs

  10. High Selectivity Oxygen Delignification

    Energy Technology Data Exchange (ETDEWEB)

    Lucian A. Lucia

    2005-11-15

    Project Objective: The objectives of this project are as follows: (1) Examine the physical and chemical characteristics of a partner mill pre- and post-oxygen delignified pulp and compare them to lab generated oxygen delignified pulps; (2) Apply the chemical selectivity enhancement system to the partner pre-oxygen delignified pulps under mill conditions (with and without any predetermined amounts of carryover) to determine how efficiently viscosity is preserved, how well selectivity is enhanced, if strength is improved, measure any yield differences and/or bleachability differences; and (3) Initiate a mill scale oxygen delignification run using the selectivity enhancement agent, collect the mill data, analyze it, and propose any future plans for implementation.

  11. HIFSA: Heavy-Ion Fusion Systems Assessment Project: Volume 1, Executive summary

    International Nuclear Information System (INIS)

    Dudziak, D.J.; Herrmannsfeldt, W.B.; Saylor, W.W.

    1987-12-01

    The Heavy-Ion Fusion Systems Assessment (HIFSA) was conducted with the specific objective of evaluating the prospects of using induction-linac heavy-ion accelerators to generate economical electrical power from Inertial Confinement Fusion (ICF). Cost/performance models of the major fusion power plant systems were used to identify promising areas in parameter space. Resulting cost-of-electricity projections for a plant size of 1 GWe are comparable to those from other fusion system studies, some of which were for much larger power plants. These favorable projections maintain over an unusually large domain of parameter space but depend especially on making large cost savings for the accelerator by using higher charge-to-mass ratio ions than assumed previously. The feasibility of realizing such savings has been shown by (1) experiments demonstrating transport stability better than anticipated for space-charge-dominated beams, and (2) theoretical predictions that the final transport and pulse compression in reactor-chamber environments will be sufficiently resistant to streaming instabilities to allow successful propagation of neutralized beams to the target. Results of the HIFSA study already have had a significant impact on the heavy-ion induction accelerator R and D program, especially in selection of the charge-state objectives. Also, the study should enhance the credibility of induction linacs as ICF drivers

  12. The role intuitive decision making plays in project selection in the residential property market: a case study of a medium sized

    OpenAIRE

    Ryan, Diarmuid

    2013-01-01

    non-peer-reviewed This thesis addresses the role of intuition in project selection in residential property development. The paper provides a comprehensive review of existing literature in relation to project selection and decision making. In addition, the examination of the project files of M.A. Ryan & Sons Ltd., a medium sized property development company, has enabled a case study to be carried out on three projects carried out by the organisation. Through the case study, t...

  13. PPP projects in transport

    DEFF Research Database (Denmark)

    Petersen, Ole Helby; Carpintero, Samuel

    2014-01-01

    Public–private partnerships (PPPs) have been extensively used in Spain for the procurement of light rail systems. This paper analyses five projects that have been in operation for more than five years. The authors examine the reasoning behind the selection of the PPP projects, risk......-sharing mechanisms, competition among private providers, and overall cost-effectiveness. The paper demonstrates a need for more rigorous assessments of the merits of PPP projects before they are initiated....

  14. Virtual fringe projection system with nonparallel illumination based on iteration

    International Nuclear Information System (INIS)

    Zhou, Duo; Wang, Zhangying; Gao, Nan; Zhang, Zonghua; Jiang, Xiangqian

    2017-01-01

    Fringe projection profilometry has been widely applied in many fields. To set up an ideal measuring system, a virtual fringe projection technique has been studied to assist in the design of hardware configurations. However, existing virtual fringe projection systems use parallel illumination and have a fixed optical framework. This paper presents a virtual fringe projection system with nonparallel illumination. Using an iterative method to calculate intersection points between rays and reference planes or object surfaces, the proposed system can simulate projected fringe patterns and captured images. A new explicit calibration method has been presented to validate the precision of the system. Simulated results indicate that the proposed iterative method outperforms previous systems. Our virtual system can be applied to error analysis, algorithm optimization, and help operators to find ideal system parameter settings for actual measurements. (paper)

  15. Shippingport Station Decommissioning Project (SSDP): configuration control system and project activity controls

    International Nuclear Information System (INIS)

    Mullee, G.R.

    1986-01-01

    The SSDP has been using a Configuration Control system as a significant element in the management plan for the safe and effective performance of the project. The objective of the Configuration Control system is to control the physical plant configuration, system status, work schedules, status tracking, and day-to-day problem resolution. Prior to the Decommissioning Operations Contractor (DOC) assuming operational responsibility for the Shippingport Plant, an assessment was made of the status of the configuration of the systems and related documentation. Action was taken as required to match the operating procedures and system documentation with the actual physical condition of the plant. During the first stage of the project, planning was put in place for subsequent decommissioning activities. This planning included defining organizational responsibilities, completing the necessary project instructions and procedures, and doing the planning and scheduling for the subsequent decommissioning phase activities. Detailed instructions for the performance of the various decommissioning tasks were prepared. Prior to the start of any work on a given Activity Package, a Work Authorization is required. The Work Authorization form provides a complete checklist to ensure that all necessary prerequisites are completed. A computerized Communications Configuration Control Information system monitors status including information on system status, tag-outs, radiological work permits, etc. An ongoing effort is being directed toward maintaining operating instructions and system schematics, etc. current as the Plant configuration changes. The experience with the Configuration Control System to date has been favorable

  16. Selecting a Cable System Operator.

    Science.gov (United States)

    Cable Television Information Center, Washington, DC.

    Intended to assist franchising authorities with the process of selecting a cable television system operator from franchise applicants, this document provides a framework for analysis of individual applications. Section 1 deals with various methods which can be used to select an operator. The next section covers the application form, the vehicle a…

  17. Author-based journal selection system that helps authors save time in article submission.

    Science.gov (United States)

    Ozturk, Onur; Ileri, Fatih

    2018-01-01

    Submission to journals takes a lot of time and format related submission requirements vary greatly from one journal to another. Lack of time and motivation in academia reduces scientific outputs and demotivates researchers. Author-based journal selection system (ABJSS) is a platform for pooling manuscripts conceived to minimize the time spent for manuscript submission and to increase scientific output. The system will provide two types of account: "Author" and "Journal Administrator". Each account type will have its own abilities and permissions. The ABJJS system is an ongoing project that will be designed in cooperation with IT experts and academicians and it will be presented to the scientific world as soon as it secures sufficient support.

  18. A projective surgical navigation system for cancer resection

    Science.gov (United States)

    Gan, Qi; Shao, Pengfei; Wang, Dong; Ye, Jian; Zhang, Zeshu; Wang, Xinrui; Xu, Ronald

    2016-03-01

    Near infrared (NIR) fluorescence imaging technique can provide precise and real-time information about tumor location during a cancer resection surgery. However, many intraoperative fluorescence imaging systems are based on wearable devices or stand-alone displays, leading to distraction of the surgeons and suboptimal outcome. To overcome these limitations, we design a projective fluorescence imaging system for surgical navigation. The system consists of a LED excitation light source, a monochromatic CCD camera, a host computer, a mini projector and a CMOS camera. A software program is written by C++ to call OpenCV functions for calibrating and correcting fluorescence images captured by the CCD camera upon excitation illumination of the LED source. The images are projected back to the surgical field by the mini projector. Imaging performance of this projective navigation system is characterized in a tumor simulating phantom. Image-guided surgical resection is demonstrated in an ex-vivo chicken tissue model. In all the experiments, the projected images by the projector match well with the locations of fluorescence emission. Our experimental results indicate that the proposed projective navigation system can be a powerful tool for pre-operative surgical planning, intraoperative surgical guidance, and postoperative assessment of surgical outcome. We have integrated the optoelectronic elements into a compact and miniaturized system in preparation for further clinical validation.

  19. Fiscal 1974 Sunshine Project result report. R and D on solar heat power generation system (R and D on curved reflector light collection system); 1974 nendo taiyonetsu hatsuden system no kenkyu kaihatsu seika hokokusho. kyokumen shuko hoshiki system no kenkyu kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1975-05-30

    This report composed of 6 parts summarizes the fiscal 1974 Sunshine Project research result on the solar heat power generation system with a curved reflector light collection system. Part 1 outlines the research target, research result and research system. Part 2 describes each research item in detail. This part on system and hardware researches is composed of (1) study on 1,000kW system, (2) development of plane/parabolic reflector light collection equipment, (3) development of parabolic reflector light collection equipment, (4) development of selective transparent membrane and selective absorption surface, and (5) study on heat storage equipment and heat exchange equipment. Part 3 describes the future R and D plan for every year focusing the fiscal 1975 R and D plan. Part 4 describes various cooperative activities with other research groups such as various committees related to the Sunshine Project, universities and Electrotechnical Laboratory. Part 5 describes several patents produced during this R and D. Part 6 summarizes the results on this R and D. (NEDO)

  20. A MCDM approach for project finance selection: An application in the renewable energy sector

    Directory of Open Access Journals (Sweden)

    García-Bernabeu, Ana

    2015-05-01

    Full Text Available Renewable energy (RE is emerging as a solution in order to replace fossil fuels and become the primary source of energy consumption. Investments in the RE sector involve huge amounts of capital but also many risks. Public sector plays an important role in promoting RE projects but due to the need for reducing public expenditure the private sector becomes essential in financing this type of projects. Project Finance is widely used in RE projects and is especially attractive to the private sector because it can fund major projects off balance sheet. The objective of this paper is to present a decision making tool for helping the private sector on the selection process of RE projects to be funded. The problem could be considered as a multiple criteria decision-making problem where both, financial and non-financial criteria have to be taken into account. Objective aggregation weights for those criteria are obtained using the Moderate Pessimism Decision Making approach and a final ranking of the projects is obtained.

  1. Tank Waste Remediation System Projects Document Control Plan

    International Nuclear Information System (INIS)

    Slater, G.D.; Halverson, T.G.

    1994-01-01

    The purpose of this Tank Waste Remediation System Projects Document Control Plan is to provide requirements and responsibilities for document control for the Hanford Waste Vitrification Plant (HWVP) Project and the Initial Pretreatment Module (IPM) Project

  2. APPLICATION OF AHP METHOD IN THE IDENTIFICATION AND CLASSIFICATION OF PROJECT SELECTION CRITERIA: AN ENERGY SECTOR CASE STUDY

    Directory of Open Access Journals (Sweden)

    Silvério, Adriano Augusto

    2015-07-01

    Full Text Available Choosing from several alternative investment projects in hydropower to build a portfolio of projects is a complex matter. The most commonly used selection model for building the portfolio is the financial method, however it constraints options investments to the economic and financial parameters, which are limiting in nature. Alternatively, this paper proposes the use of multicriterial method Analytic Hierarchy Process – AHP, which incorporates measures to evaluate both quantitative and qualitative data. This method is based on criteria or parameters of operational processes that hinder or facilitate the execution of projects. In order to get the definition of the set of criteria, the Delphi technique was applied to a group of seven experts in managing hydropower projects. Main results show that essential criteria for selection of project investment portfolio, are not limited to financial aspects, but it involves criteria of bureaucratic, organizational, and political environment and technological characters. The conclusion is that the financial potential of hydropower projects are not the only determinants for investments on hydropower projects and, at large, these project are conditioned to other criteria such as, those of bureaucratic and technological nature.

  3. Advanced Ground Systems Maintenance Physics Models For Diagnostics Project

    Science.gov (United States)

    Perotti, Jose M.

    2015-01-01

    The project will use high-fidelity physics models and simulations to simulate real-time operations of cryogenic and systems and calculate the status/health of the systems. The project enables the delivery of system health advisories to ground system operators. The capability will also be used to conduct planning and analysis of cryogenic system operations. This project will develop and implement high-fidelity physics-based modeling techniques tosimulate the real-time operation of cryogenics and other fluids systems and, when compared to thereal-time operation of the actual systems, provide assessment of their state. Physics-modelcalculated measurements (called “pseudo-sensors”) will be compared to the system real-timedata. Comparison results will be utilized to provide systems operators with enhanced monitoring ofsystems' health and status, identify off-nominal trends and diagnose system/component failures.This capability can also be used to conduct planning and analysis of cryogenics and other fluidsystems designs. This capability will be interfaced with the ground operations command andcontrol system as a part of the Advanced Ground Systems Maintenance (AGSM) project to helpassure system availability and mission success. The initial capability will be developed for theLiquid Oxygen (LO2) ground loading systems.

  4. Effective selection of transgenic papaya plants with the PMI/Man selection system.

    Science.gov (United States)

    Zhu, Yun J; Agbayani, Ricelle; McCafferty, Heather; Albert, Henrik H; Moore, Paul H

    2005-09-01

    The selectable marker gene phospho-mannose isomerase (pmi), which encodes the enzyme phospho-mannose isomerase (PMI) to enable selection of transformed cell lines on media containing mannose (Man), was evaluated for genetic transformation of papaya (Carica papaya L.). We found that papaya embryogenic calli have little or no PMI activity and cannot utilize Man as a carbon source; however, when calli were transformed with a pmi gene, the PMI activity was greatly increased and they could utilize Man as efficiently as sucrose. Plants regenerated from selected callus lines also exhibited PMI activity but at a lower specific activity level. Our transformation efficiency with Man selection was higher than that reported using antibiotic selection or with a visual marker. For papaya, the PMI/Man selection system for producing transgenic plants is a highly efficient addition to previously published methods for selection and may facilitate the stacking of multiple transgenes of interest. Additionally, since the PMI/Man selection system does not involve antibiotic or herbicide resistance genes, its use might reduce environmental concerns about the potential flow of those genes into related plant populations.

  5. A Consistent Fuzzy Preference Relations Based ANP Model for R&D Project Selection

    Directory of Open Access Journals (Sweden)

    Chia-Hua Cheng

    2017-08-01

    Full Text Available In today’s rapidly changing economy, technology companies have to make decisions on research and development (R&D projects investment on a routine bases with such decisions having a direct impact on that company’s profitability, sustainability and future growth. Companies seeking profitable opportunities for investment and project selection must consider many factors such as resource limitations and differences in assessment, with consideration of both qualitative and quantitative criteria. Often, differences in perception by the various stakeholders hinder the attainment of a consensus of opinion and coordination efforts. Thus, in this study, a hybrid model is developed for the consideration of the complex criteria taking into account the different opinions of the various stakeholders who often come from different departments within the company and have different opinions about which direction to take. The decision-making trial and evaluation laboratory (DEMATEL approach is used to convert the cause and effect relations representing the criteria into a visual network structure. A consistent fuzzy preference relations based analytic network process (CFPR-ANP method is developed to calculate the preference-weights of the criteria based on the derived network structure. The CFPR-ANP is an improvement over the original analytic network process (ANP method in that it reduces the problem of inconsistency as well as the number of pairwise comparisons. The combined complex proportional assessment (COPRAS-G method is applied with fuzzy grey relations to resolve conflicts arising from differences in information and opinions provided by the different stakeholders about the selection of the most suitable R&D projects. This novel combination approach is then used to assist an international brand-name company to prioritize projects and make project decisions that will maximize returns and ensure sustainability for the company.

  6. A modular projection autostereoscopic system for stereo cinema

    Science.gov (United States)

    Elkhov, Victor A.; Kondratiev, Nikolai V.; Ovechkis, Yuri N.; Pautova, Larisa V.

    2009-02-01

    The lenticular raster system for 3D movies non-glasses show designed by NIKFI demonstrated commercially in Moscow in the 40'st of the last century. Essential lack of this method was narrow individual viewing zone as only two images on the film used. To solve this problem, we propose to use digital video projective system with modular principle of its design. Increase of the general number of the pixels forming the stereo image is reached by using of more than one projector. The modular projection autostereoscopic system for demonstration of the 3D movies includes diffuser screen; lenticular plate located in front of the screen; projective system consisted from several projectors and the block of parallax panoramogram fragments creator. By means of this block the parallax panoramogram is broken into fragments which quantity corresponds to number of projectors. For the large dimension lenticular screen making rectangular fragments of inclined raster were joined in a uniform leaf. To obtain the needed focal distance of the screen lenses we used immersion - aqueous solution of glycerin. The immersion also let essentially decrease visibility of fragments joints. An experimental prototype of the modular projection autostereoscopic system was created to validate proposed system.

  7. SNF sludge treatment system preliminary project execution plan

    International Nuclear Information System (INIS)

    Flament, T.A.

    1998-01-01

    The Fluor Daniel Hanford, Inc. (FDH) Project Director for the Spent Nuclear Fuel (SNF) Project has requested Numatec Hanford Company (NHC) to define how Hanford would manage a new subproject to provide a process system to receive and chemically treat radioactive sludge currently stored in the 100 K Area fuel retention basins. The subproject, named the Sludge Treatment System (STS) Subproject, provides and operates facilities and equipment to chemically process K Basin sludge to meet Tank Waste Remediation System (TWRS) requirements. This document sets forth the NHC management approach for the STS Subproject and will comply with the requirements of the SNF Project Management Plan (HNF-SD-SNFPMP-011). This version of this document is intended to apply to the initial phase of the subproject and to evolve through subsequent revision to include all design, fabrication, and construction conducted on the project and the necessary management and engineering functions within the scope of the subproject. As Project Manager, NHC will perform those activities necessary to complete the STS Subproject within approved cost and schedule baselines and turn over to FDH facilities, systems, and documentation necessary for operation of the STS

  8. A Symbiosis between Instructional Systems Design and Project Management

    Science.gov (United States)

    Pan, Cheng-Chang

    2012-01-01

    This study is intended to explore a complementary relationship between instructional systems design (ISD) and project management in an attempt to build a plausible case for integrating project management as a distinct course in the core of the graduate instructional systems design programs. It is argued that ISD and project management should form…

  9. The method and index of sustainability assessment of infrastructure projects based on system dynamics in China

    Directory of Open Access Journals (Sweden)

    Jun Zhou

    2015-05-01

    Full Text Available Purpose: As one of the most important overhead capital of urban economics and social development, the sustainable development of urban infrastructure is becoming a key issue of prosperous society growing. The purpose of this paper is to establish a basic model to analysis certain infrastructure project’s sustainable construction and operation. Design/methodology/approach: System dynamics is an effective stimulation method and tool to deal with such complex, dynamics, nonlinear systems, which could be used in analyzing and evaluating all aspects of infrastructure sustainability internally and externally. In this paper, the system is divided into four subsystems and 12 main impact indicators. Through setting the boundary and other basic hypothesis, this paper designs the basic causal loop diagrams and stock & flow diagrams to describe the relationship between variables and establish a quantifiable structure for the system. Findings: Adopting a sewerage treatment in China as a case to test our model, we could conclude that the model of internal sustainable subsystem is reasonable. However, this model is a basic model, and it need to be specific designed for the certain project due to the diversity of infrastructure types and the unique conditions of each projects. Originality/value: System Dynamics (SD is widely used in the study of sustainable development and has plentiful research achievements from macro perspective but few studies in the microcosmic project systems. This paper focuses on the unique characteristics of urban infrastructure in China and selects infrastructure project which is based on micro-system discussion. The model we designed has certain practical significance in policy setting, operation monitoring and adjustment of the urban projects with high rationality and accuracy.

  10. The NASA Advanced Space Power Systems Project

    Science.gov (United States)

    Mercer, Carolyn R.; Hoberecht, Mark A.; Bennett, William R.; Lvovich, Vadim F.; Bugga, Ratnakumar

    2015-01-01

    The goal of the NASA Advanced Space Power Systems Project is to develop advanced, game changing technologies that will provide future NASA space exploration missions with safe, reliable, light weight and compact power generation and energy storage systems. The development effort is focused on maturing the technologies from a technology readiness level of approximately 23 to approximately 56 as defined in the NASA Procedural Requirement 7123.1B. Currently, the project is working on two critical technology areas: High specific energy batteries, and regenerative fuel cell systems with passive fluid management. Examples of target applications for these technologies are: extending the duration of extravehicular activities (EVA) with high specific energy and energy density batteries; providing reliable, long-life power for rovers with passive fuel cell and regenerative fuel cell systems that enable reduced system complexity. Recent results from the high energy battery and regenerative fuel cell technology development efforts will be presented. The technical approach, the key performance parameters and the technical results achieved to date in each of these new elements will be included. The Advanced Space Power Systems Project is part of the Game Changing Development Program under NASAs Space Technology Mission Directorate.

  11. Methodical bases of selection and evaluation of the effectiveness of the projects of the urban territory renovation

    Science.gov (United States)

    Sizova, Evgeniya; Zhutaeva, Evgeniya; Chugunov, Andrei

    2018-03-01

    The article highlights features of processes of urban territory renovation from the perspective of a commercial entity participating in the implementation of a project. The requirements of high-rise construction projects to the entities, that carry out them, are considered. The advantages of large enterprises as participants in renovation projects are systematized, contributing to their most efficient implementation. The factors, which influence the success of the renovation projects, are presented. A method for selecting projects for implementation based on criteria grouped by qualitative characteristics and contributing to the most complete and comprehensive evaluation of the project is suggested. Patterns to prioritize and harmonize renovation projects in terms of multi-project activity of the enterprise are considered.

  12. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  13. Selecting the Most Economic Project under Uncertainty Using Bootstrap Technique and Fuzzy Simulation

    Directory of Open Access Journals (Sweden)

    Kamran Shahanaghi

    2012-01-01

    Full Text Available This article, by leaving pre-determined membership function of a fuzzy set which is a basic assumption for such subject, will try to propose a hybrid technique to select the most economic project among alternative projects in fuzziness interest rates condition. In this way, net present worth (NPW would be the economic indicator. This article tries to challenge the assumption of large sample sizes availability for membership function determination and shows that some other techniques may have less accuracy. To give a robust solution, bootstrapping and fuzzy simulation is suggested and a numerical example is given and analyzed.

  14. System supplier approach to projects and operations efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Moe, P O [Siemens Offshore A/S (Norway)

    1994-12-31

    The conference paper outlines the most important elements for a new approach to project realisation that enable a cost reduction of 30-50% compared to conventional methods. The achievements are based on studies and evaluations to the Norwegian Vigdis development project. The system elements covered are the electrical and automation systems including safety and process control and all traditional phases of a project from concept design to the operational phase. The concept involves new principles for project execution where traditional borderlines and interfaces between the various participants have been redefined. Management attention has been verified as an important prerequisite for a successful implementation of this strategy. 2 figs.

  15. Analytic Hierarchy Process & Multi Attribute Utility Theory Based Approach for the Selection of Lighting Systems in Residential Buildings: A Case Study

    Directory of Open Access Journals (Sweden)

    Othman Alshamrani

    2018-05-01

    Full Text Available This paper presents an approach developed for selecting lighting systems in residential buildings using an Analytic Hierarchy Process (AHP and the Multi Criteria Decision Making Technique (MCDMT. The developed approach considers four selection criteria of lighting systems: life-cycle cost, illumination, environmental performance, and life-span. The criteria of selection, along with the most widely used lighting systems in residential buildings, were determined through questionnaire surveys with suppliers, maintenance managers, and lighting experts. The Analytic Hierarchy Process and Multi Attribute Utility Theory were utilized to assess the significant influence of the identified main and sub-criteria on the selection process, from the design point of view. The developed approach was tested on a real case project in selecting the lighting system for aresidential building in Saudi Arabia. The obtained results show that the life-cycle cost and illumination proprieties, followed by the service life were found to be the most influential measures in the selection process. The results also show that Light-Emitting Diode(LED lighting systems prove to bear the highest initial cost while sustaining the best overall performance.

  16. FY 1977 Annual report on Sunshine Project results. Research on solar energy systems for air conditioning and hot water supply; 1977 nendo taiyo netsu reidanbo kyuto system no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1978-03-31

    This project is aimed at research and development of utilization of solar energy for air conditioning and hot water supply, as part of the researches on systems under Sunshine Project for utilization of solar energy. This project is focused on the research items, selected from those pursued by the 3-year project beginning in FY1974 as the ones considered to be important for the future diffusion and promotion of the systems for utilization of solar energy. The 3-year project has produced the software and hardware results, based on development of the devices and construction of a solar house. At this stage of time, it is pointed out that studies on economic viability of the system, development of the software for diffusion of the solar systems, and development of new, more suitable systems and methods for utilization of solar energy are important. In this fiscal year, the four themes (studies on economic viability of the conceptual solar system designs, simplified methods for designing the systems, evaluation of system performance, and studies on energy-saving effects and economic viability) are taken up, viewed from development of the software for diffusion and promotion of the systems for utilizing solar energy, based on the results obtained by the previous 3-year project. (NEDO)

  17. Multi-period project portfolio selection under risk considerations and stochastic income

    Science.gov (United States)

    Tofighian, Ali Asghar; Moezzi, Hamid; Khakzar Barfuei, Morteza; Shafiee, Mahmood

    2018-02-01

    This paper deals with multi-period project portfolio selection problem. In this problem, the available budget is invested on the best portfolio of projects in each period such that the net profit is maximized. We also consider more realistic assumptions to cover wider range of applications than those reported in previous studies. A novel mathematical model is presented to solve the problem, considering risks, stochastic incomes, and possibility of investing extra budget in each time period. Due to the complexity of the problem, an effective meta-heuristic method hybridized with a local search procedure is presented to solve the problem. The algorithm is based on genetic algorithm (GA), which is a prominent method to solve this type of problems. The GA is enhanced by a new solution representation and well selected operators. It also is hybridized with a local search mechanism to gain better solution in shorter time. The performance of the proposed algorithm is then compared with well-known algorithms, like basic genetic algorithm (GA), particle swarm optimization (PSO), and electromagnetism-like algorithm (EM-like) by means of some prominent indicators. The computation results show the superiority of the proposed algorithm in terms of accuracy, robustness and computation time. At last, the proposed algorithm is wisely combined with PSO to improve the computing time considerably.

  18. A contrast between DEMATEL-ANP and ANP methods for six sigma project selection: a case study in healthcare industry.

    Science.gov (United States)

    Ortíz, Miguel A; Felizzola, Heriberto A; Nieto Isaza, Santiago

    2015-01-01

    The project selection process is a crucial step for healthcare organizations at the moment of implementing six sigma programs in both administrative and caring processes. However, six-sigma project selection is often defined as a decision making process with interaction and feedback between criteria; so that it is necessary to explore different methods to help healthcare companies to determine the Six-sigma projects that provide the maximum benefits. This paper describes the application of both ANP (Analytic Network process) and DEMATEL (Decision Making trial and evaluation laboratory)-ANP in a public medical centre to establish the most suitable six sigma project and finally, these methods were compared to evaluate their performance in the decision making process. ANP and DEMATEL-ANP were used to evaluate 6 six sigma project alternatives under an evaluation model composed by 3 strategies, 4 criteria and 15 sub-criteria. Judgement matrixes were completed by the six sigma team whose participants worked in different departments of the medical centre. The improving of care opportunity in obstetric outpatients was elected as the most suitable six sigma project with a score of 0,117 as contribution to the organization goals. DEMATEL-ANP performed better at decision making process since it reduced the error probability due to interactions and feedback. ANP and DEMATEL-ANP effectively supported six sigma project selection processes, helping to create a complete framework that guarantees the prioritization of projects that provide maximum benefits to healthcare organizations. As DEMATEL- ANP performed better, it should be used by practitioners involved in decisions related to the implementation of six sigma programs in healthcare sector accompanied by the adequate identification of the evaluation criteria that support the decision making model. Thus, this comparative study contributes to choosing more effective approaches in this field. Suggestions of further work are also

  19. Generalized projective synchronization between Lorenz system and Chen's system

    International Nuclear Information System (INIS)

    Li Guohui

    2007-01-01

    On the basis of active backstepping design, this paper presents the generalized projective synchronization between two different chaotic systems: Lorenz system and Chen's system. The proposed method combines backstepping methods and active control without having to calculate the Lyapunov exponents and the eigenvalues of the Jacobian matrix, which makes it simple and convenient. Numerical simulations show that this method works very well

  20. [Wavelength Selection in Hemolytic Evaluation Systems with Spectrophotometry Detection].

    Science.gov (United States)

    Zhang, Hong; Su, Baochang; Ye, Xunda; Luo, Man

    2016-04-01

    Spectrophotometry is a simple hemolytic evaluation method commonly used in new drugs,biomedical materials and blood products.It is for the quantitative analysis of the characteristic absorption peaks of hemoglobin.Therefore,it is essential to select the correct detection wavelength when the evaluation system has influences on the conformation of hemoglobin.Based on the study of changes in the characteristic peaks over time of the hemolysis supernatant in four systems,namely,cell culture medium,phosphate buffered saline(PBS),physiological saline and banked blood preservation solution,using continuous wavelength scanning,the selections of detection wavelength were proposed as follows.In the cell culture medium system,the wavelength of 415 nm should be selected within 4h;,near 408 nm should be selected within 4~72h.In PBS system,within 4h,541 nm,577nm or 415 nm should be selected;4~72h,541 nm,577nm or near 406 nm should be selected.In physiological saline system,within 4h,414 nm should be selected;4~72h,near 405 nm should be selected;within 12 h,541nm or 577 nm could also be selected.In banked blood preservation solution system,within 72 h,415nm,540 nm or 576 nm should be selected.

  1. Multiuser hybrid switched-selection diversity systems

    KAUST Repository

    Shaqfeh, Mohammad

    2011-09-01

    A new multiuser scheduling scheme is proposed and analyzed in this paper. The proposed system combines features of conventional full-feedback selection-based diversity systems and reduced-feedback switch-based diversity systems. The new hybrid system provides flexibility in trading-off the channel information feedback overhead with the prospected multiuser diversity gains. The users are clustered into groups, and the users\\' groups are ordered into a sequence. Per-group feedback thresholds are used and optimized to maximize the system overall achievable rate. The proposed hybrid system applies switched diversity criterion to choose one of the groups, and a selection criterion to decide the user to be scheduled from the chosen group. Numerical results demonstrate that the system capacity increases as the number of users per group increases, but at the cost of more required feedback messages. © 2011 IEEE.

  2. Evaluation of a prototype decision support system for selecting trench cap designs

    International Nuclear Information System (INIS)

    Paige, G.B.; Stone, J.J.; Lane, L.J.

    1996-01-01

    A computer-based prototype decision support system (PDSS) to assist the risk manager in selecting an appropriate trench cap design for waste disposal sites is evaluated. The selection of the open-quotes bestclose quotes design among feasible alternatives requires consideration of multiple and often conflicting objectives. The methodology used in the selection process consists of. selecting and parameterizing decision variables, using data, simulation models, or expert opinion; selecting feasible trench cap design alternatives; ordering the decision variables and ranking the design alternatives. The simulation models incorporated in the PDSS are the Hydrologic Evaluation of Landfill Performance (HELP) model which is used to simulate the trench cap water balance and the Chemicals, Runoff, and Erosion from Agricultural Management Systems (CREAMS) erosion component that is used to simulate trench cap erosion. The decision model is based on multi-objective decision theory and uses a unique approach to order the decision variables and rank the design alternatives. The PDSS is evaluated using the Hill Air Force Base landfill cover demonstration project. The water balance and surface erosion of four alternative landfill cover designs were monitored for a 4-yr period. Two of the cover designs were used to calibrate and test the simulation models. The results of the PDSS, using both data from all four designs and long-term simulations from two of the designs, illustrate the relative advantages of each of the cover designs and which cover is the open-quotes bestclose quotes alternative for a given set of criteria and a particular importance order of those decision criteria. 22 refs., 6 figs., 4 tabs

  3. I and C systems refurbishment projects for plant life extension

    International Nuclear Information System (INIS)

    Andrashov, A.A.; Sklyar, V.V.; Siora, A.A.

    2012-01-01

    This paper describes the approach to implementation of Nuclear Power Plants (NPPs) Instrumentation and Control (I and C) systems refurbishment projects using Field Programmable Gate Array (FPGA)-based platform. The analysis identifying advantages of refurbishment projects for NPPs is performed. The main goals of the utilities with respect to refurbishment of NPPs I and C systems are outlined. The advantages of FPGA technology application for NPP I and C systems are described. Regulatory framework of FPGA technology for NPPs I and C systems is presented. General principles which may be used for implementation of NPPs I and C system refurbishment projects are presented. The experience of Research and Production Corporation (RPC) Radiy in implementation of NPPs I and C system refurbishment projects is considered. (author)

  4. Extending the GANIL control system for the SPIRAL project

    International Nuclear Information System (INIS)

    Lecorche, E.

    1997-01-01

    The SPIRAL project under construction at GANIL aims to deliver radioactive ion beams to the physicists by the end of 1998. In 1996, it has been proposed to achieve most of the SPIRAL control system as an extension of the system currently in use at GANIL. Therefore the main features of the GANIL control system design are first recalled. Then the paper shows how the GANIL control system should have been upgraded and extended to integrate the SPIRAL project. This evolution had to cope with the specific needs brought by the new machine and to consider the size of the project which is around one third of the GANIL control system volume. Lastly current status of the system is given. (author)

  5. Extending the GANIL control system for the SPIRAL project

    Energy Technology Data Exchange (ETDEWEB)

    Lecorche, E

    1997-12-31

    The SPIRAL project under construction at GANIL aims to deliver radioactive ion beams to the physicists by the end of 1998. In 1996, it has been proposed to achieve most of the SPIRAL control system as an extension of the system currently in use at GANIL. Therefore the main features of the GANIL control system design are first recalled. Then the paper shows how the GANIL control system should have been upgraded and extended to integrate the SPIRAL project. This evolution had to cope with the specific needs brought by the new machine and to consider the size of the project which is around one third of the GANIL control system volume. Lastly current status of the system is given. (author) 5 refs.

  6. Project Management Consultancy (PMC) procurement approach: Supplier's evaluation and selection dilemma

    Science.gov (United States)

    Nawi, Mohd Nasrun Mohd; Azimi, Mohd Azrulfitri; Pozin, Mohd Affendi Ahmad; Osman, Wan Nadri; Anuar, Herman Shah

    2016-08-01

    Project Management Consultancy (PMC) is part of the management oriented procurement method in which a sole consultant is hired by the client to deal with the contactors in place of the client. Appointing contractors in this method or approach looks to be interesting as client could play a pivotal role in evaluating and selecting the supplier/contractor for the work package. In some cases, client gives the authority for the PMC to hire the supplier/contractor of their choice while in some cases the client is the one who made the decision. This research paper seeks to investigate the dilemma arises from this situation and for the purpose of this research, a real case study was studied to assess the impacts of such dilemma to the performance of the project. Recommendations on how to tackle the dilemma will also be addressed in the later part of this research paper.

  7. Women, Islam, and Pakistan: A Selected Annotated Bibliography. Fulbright-Hays Summer Seminar Abroad Project.

    Science.gov (United States)

    Phillips, Brenda

    This bibliography features selected books, book chapters, research projects, and journal articles, published between 1953 and 1994, about the social, legal, economic, educational political, and professional position of Muslim Pakistani women. Sixteen of the references are annotated. An additional 41 bibliographic references to other materials, not…

  8. Selection of the best consultant for SAP ERP project using combined AHP-IBA approach

    Directory of Open Access Journals (Sweden)

    Martinović Nataša

    2014-01-01

    Full Text Available In this paper we propose a combined AHP-IBA model for selecting the best SAP consultant for an SAP ERP project. The goal of the SAP Project Manager is to choose the best consultant, the one who is able to implement standard SAP functionalities with quality and on time. When making a decision on the basis of multiple criteria, the traditional Analytic Hierarchy Process (AHP method does not take into account the fact that attributes may correlate, assuming that there are no dependencies between them. However, the dependencies of the attributes can often be used to model important knowledge for multiple criteria decision analysis. We propose an extension to the traditional AHP method by applying Interpolative realization of Boolean algebra (IBA, using AHP to determine the criteria weights, and IBA to model the logical interactions among criteria. The research conducted on ERP consultant selection suggests that the decision making process is modelled more accurately if logical interactions between attributes are modelled before applying AHP.

  9. Selection Method for COTS Systems

    DEFF Research Database (Denmark)

    Hedman, Jonas; Andersson, Bo

    2014-01-01

    feature behind the method is that improved understanding of organizational ‘ends’ or goals should govern the selection of a COTS system. This can also be expressed as a match or fit between ‘ends’ (e.g. improved organizational effectiveness) and ‘means’ (e.g. implementing COTS systems). This way...

  10. SELECTING A MANAGEMENT SYSTEM HOSPITAL BY A METHOD MULTICRITERIA

    Directory of Open Access Journals (Sweden)

    Vitorino, Sidney L.

    2016-12-01

    Full Text Available The objective of this report is to assess how the multi-criteria method Analytic Hierarchy Process [HP] can help a hospital complex to choose a more suitable management system, known as Enterprise Resource Planning (ERP. The choice coated is very complex due to the novelty of the process of choosing and conflicts generated between areas that did not have a single view of organizational needs, generating a lot of pressure in the department responsible for implementing systems. To assist in this process, he was hired an expert consultant in decision-making and AHP, which in its role of facilitator, contributed to the criteria for system selection were defined, and the choice to occur within a consensual process. We used the study of a single case, based on two indepth interviews with the consultant and the project manager, and documents generated by the advisory and the tool that supported the method. The results of this analysis showed that the method could effectively collaborate in the system acquisition process, but knowledge of the problems of employees and senior management support, it was not used in new decisions of the organization. We conclude that this method contributed to the consensus in the procurement process, team commitment and engagement of those involved.

  11. Construction Tender Subcontract Selection using Case-based Reasoning

    Directory of Open Access Journals (Sweden)

    Due Luu

    2012-11-01

    Full Text Available Obtaining competitive quotations from suitably qualified subcontractors at tender tim n significantly increase the chance of w1nmng a construction project. Amidst an increasingly growing trend to subcontracting in Australia, selecting appropriate subcontractors for a construction project can be a daunting task requiring the analysis of complex and dynamic criteria such as past performance, suitable experience, track record of competitive pricing, financial stability and so on. Subcontractor selection is plagued with uncertainty and vagueness and these conditions are difficul_t o represent in generalised sets of rules. DeciSIOns pertaining to the selection of subcontr:act?s tender time are usually based on the mtu1t1onand past experience of construction estimators. Case-based reasoning (CBR may be an appropriate method of addressing the chal_lenges of selecting subcontractors because CBR 1s able to harness the experiential knowledge of practitioners. This paper reviews the practicality and suitability of a CBR approach for subcontractor tender selection through the development of a prototype CBR procurement advisory system. In this system, subcontractor selection cases are represented by a set of attributes elicited from experienced construction estimators. The results indicate that CBR can enhance the appropriateness of the selection of subcontractors for construction projects.

  12. Redefining Project Management Information Systems with New IT Services

    Directory of Open Access Journals (Sweden)

    Luminita Hurbean

    2013-04-01

    Full Text Available Achieving successful adoption of an innovative project management information system should involve influencing the project management environment by providing useful tools, training, reusable templates, techniques, and methods that improve the project manager's ability to successfully execute. This paper suggests that project management practice, enabled by emerging IT, could more explicitly recognize, represent, and manage the interdependencies that are pervasive throughout projects, thereby fully exploiting the potential of the IT to improve overall project performance. The last few years IT&C evolution led to new approaches to application and infrastructure architecture. Breaking from the traditional procedures used by organizations, they propose a cloud operating platform that reduces complexity and improves agility and scalability by altering the approach to the way data centres are built, applications are developed, infrastructure is managed, and organizations align and collaborate. Further, the paper explores the growing impact of mobile computing, cloud delivery and social business collaboration project management information systems and proposes a shift of a Five C’s for information systems in a cloud based operating platform, driven by cooperation, teamwork and continuous improvement.The proposed shift in the cloud indicates actual tools that may be adopted for better collaboration and higher business value of the project information management.

  13. Selective correlations in finite quantum systems and the Desargues property

    Science.gov (United States)

    Lei, C.; Vourdas, A.

    2018-06-01

    The Desargues property is well known in the context of projective geometry. An analogous property is presented in the context of both classical and Quantum Physics. In a classical context, the Desargues property implies that two logical circuits with the same input show in their outputs selective correlations. In general their outputs are uncorrelated, but if the output of one has a particular value, then the output of the other has another particular value. In a quantum context, the Desargues property implies that two experiments each of which involves two successive projective measurements have selective correlations. For a particular set of projectors, if in one experiment the second measurement does not change the output of the first measurement, then the same is true in the other experiment.

  14. Expert System Model for Educational Personnel Selection

    Directory of Open Access Journals (Sweden)

    Héctor A. Tabares-Ospina

    2013-06-01

    Full Text Available The staff selection is a difficult task due to the subjectivity that the evaluation means. This process can be complemented using a system to support decision. This paper presents the implementation of an expert system to systematize the selection process of professors. The management of software development is divided into 4 parts: requirements, design, implementation and commissioning. The proposed system models a specific knowledge through relationships between variables evidence and objective.

  15. Selection of nuclear power information database management system

    International Nuclear Information System (INIS)

    Zhang Shuxin; Wu Jianlei

    1996-01-01

    In the condition of the present database technology, in order to build the Chinese nuclear power information database (NPIDB) in the nuclear industry system efficiently at a high starting point, an important task is to select a proper database management system (DBMS), which is the hinge of the matter to build the database successfully. Therefore, this article explains how to build a practical information database about nuclear power, the functions of different database management systems, the reason of selecting relation database management system (RDBMS), the principles of selecting RDBMS, the recommendation of ORACLE management system as the software to build database and so on

  16. A planning and scheduling system for the LHC project

    CERN Document Server

    Bachy, Gérard; Tarrant, M

    1995-01-01

    The purpose of this paper is to present modern ways to manage time, resources and progress in a large-scale project. Over the last ten years, new project management techniques and tools have appeared such as concurrent engineering, Continuous Acquisition Lifecycle Support (CALS) and Engineering Data Management System (EDMS). The world downturn of the early 90s influenced project management: increasing constraints on time and budget and more external direction on spending that, for example, requires sophisticated sub-contracting practises. However, the evolution of the software and hardware market makes project control tools cheaper and easier to use. All project groups want to have their scope of work considered as complete projects and to control them themselves. This has several consequences on project staff behaviour concerning project control, and has to be taken into account in every planning process designed today. The system described will be at the heart of the planning and scheduling procedures issue...

  17. QFD Application to a Software - Intensive System Development Project

    Science.gov (United States)

    Tran, T. L.

    1996-01-01

    This paper describes the use of Quality Function Deployment (QFD), adapted to requirements engineering for a software-intensive system development project, and sysnthesizes the lessons learned from the application of QFD to the Network Control System (NCS) pre-project of the Deep Space Network.

  18. Selective Attention in Multi-Chip Address-Event Systems

    Directory of Open Access Journals (Sweden)

    Giacomo Indiveri

    2009-06-01

    Full Text Available Selective attention is the strategy used by biological systems to cope with the inherent limits in their available computational resources, in order to efficiently process sensory information. The same strategy can be used in artificial systems that have to process vast amounts of sensory data with limited resources. In this paper we present a neuromorphic VLSI device, the “Selective Attention Chip” (SAC, which can be used to implement these models in multi-chip address-event systems. We also describe a real-time sensory-motor system, which integrates the SAC with a dynamic vision sensor and a robotic actuator. We present experimental results from each component in the system, and demonstrate how the complete system implements a real-time stimulus-driven selective attention model.

  19. Selective attention in multi-chip address-event systems.

    Science.gov (United States)

    Bartolozzi, Chiara; Indiveri, Giacomo

    2009-01-01

    Selective attention is the strategy used by biological systems to cope with the inherent limits in their available computational resources, in order to efficiently process sensory information. The same strategy can be used in artificial systems that have to process vast amounts of sensory data with limited resources. In this paper we present a neuromorphic VLSI device, the "Selective Attention Chip" (SAC), which can be used to implement these models in multi-chip address-event systems. We also describe a real-time sensory-motor system, which integrates the SAC with a dynamic vision sensor and a robotic actuator. We present experimental results from each component in the system, and demonstrate how the complete system implements a real-time stimulus-driven selective attention model.

  20. The Analysis of Project Finance: a Case Study of Kazakhstan Caspian Transportation System Project

    OpenAIRE

    Serikbayeva, Aigul

    2011-01-01

    Although project finance is a large and fast growing field in finance, there has been very little academic research in that area. The main reason for this deficit is that it is a relatively new sphere in finance and it is difficult to access the information about the implementation of projects from the companies that implement them. This project will provide an overview of how companies finance large infrastructure projects through a case study of the Kazakhstan Caspian Transportation System ...

  1. Systems Analysis and Design for Decision Support Systems on Economic Feasibility of Projects

    Science.gov (United States)

    Balaji, S. Arun

    2010-11-01

    This paper discuss about need for development of the Decision Support System (DSS) software for economic feasibility of projects in Rwanda, Africa. The various economic theories needed and the corresponding formulae to compute payback period, internal rate of return and benefit cost ratio of projects are clearly given in this paper. This paper is also deals with the systems flow chart to fabricate the system in any higher level computing language. The various input requirements from the projects and the output needed for the decision makers are also included in this paper. The data dictionary used for input and output data structure is also explained.

  2. Fault tree analysis of Project S-4404, Upgrade Canyon Exhaust System

    International Nuclear Information System (INIS)

    Browne, E.V.; Low, J.M.; Lux, C.R.

    1992-01-01

    Project S-4404, Upgrade Canyon Exhaust Systems, is a $177 million project with the purpose of upgrading the Exhaust Systems for both F and H Canyon Facilities. This upgrade will replace major portions of the F and H-Canyon exhaust systems, downstream of their respective sand filters with higher capacity and more reliable systems. Because of the high cost, DOE requested Program Control ampersand Integration (PC ampersand I) to examine specific deletions to the project. PC ampersand I requested Nuclear Processes Safety Research (NPSR) to perform an analysis to compare failure rates for the existing F ampersand H Canyon exhaust systems with the proposed exhaust system and specific proposed exhaust system alternatives. The objective of this work was to perform an analysis and compare failure rates for the existing F ampersand H Canyon exhaust systems with the proposed project exhaust system and proposed project alternatives. Based on fault tree analysis, two conclusions are made. First, D ampersand D activities can be eliminated from the project with no significant decrease to exhaust system safety. Deletion of D ampersand D activities would result in a cost savings of $29 million. Second, deletion of DOE Order 6430.1A requirements regarding DBAs would decrease exhaust system safety by a factor of 12

  3. Methods Dealing with Complexity in Selecting Joint Venture Contractors for Large-Scale Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    Ru Liang

    2018-01-01

    Full Text Available The magnitude of business dynamics has increased rapidly due to increased complexity, uncertainty, and risk of large-scale infrastructure projects. This fact made it increasingly tough to “go alone” into a contractor. As a consequence, joint venture contractors with diverse strengths and weaknesses cooperatively bid for bidding. Understanding project complexity and making decision on the optimal joint venture contractor is challenging. This paper is to study how to select joint venture contractors for undertaking large-scale infrastructure projects based on a multiattribute mathematical model. Two different methods are developed to solve the problem. One is based on ideal points and the other one is based on balanced ideal advantages. Both of the two methods consider individual difference in expert judgment and contractor attributes. A case study of Hong Kong-Zhuhai-Macao-Bridge (HZMB project in China is used to demonstrate how to apply these two methods and their advantages.

  4. Development of Earned Value Management System in PP Construction Project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sang-Hyun; Moon, Byeong-Suk [KHNP-CRI, Daejeon (Korea, Republic of)

    2014-10-15

    The NPP construction project has been determined in the form of a rather lump-sum contract with little details in resource requirements and estimations. Therefore, Earned Value Management System (EVMS) needs to be applied to the NPP projects in order to incorporate scope, schedule and cost targeting efficient and to control effective resource. The NPP projects in Korea have not applied EVMS. EVMS has phased in NPP construction project by Korea Hydro and Nuclear Power Co., Ltd (KHNP), playing the role of project master manager in NPP construction in Korea. This study presented the EVMS unlike other system. Accordingly, EVMS is expected to reduce risks and increase efficiency in the NPP project. The NPP construction project is a technology ntensive multi-construction project that should be based on economics and stability and that takes over ten years to complete, requiring investment of billions of dollars, a great number of persons concerned, and a vast store of human and material resources. KHNP is phasing EVMS in NPP construction project for overseas contracts and the efficient management, the paper presented the pilot EVMS in KHNP. It expected to control and identify of NPP construction projects by using EVMS as a computerized management tool which is quantitative and objective management criteria. It is necessary to improve of the contract system related EVM for enterprise system, and the effort will be required, such as on-site support and training so that this can be done in collaboration with the relevant stakeholders.

  5. Survey of siting practices for selected management projects in seven countries

    International Nuclear Information System (INIS)

    Hardin, E.; Aahagen, H.

    1992-06-01

    This paper surveys siting practices for deep geologic disposal in seven countries, and attempts to formulate generalizations which could be useful for the upcoming review of the Swedish plan for siting the SFL repository (R and D 92). Comparison of projects in different countries is done with full appreciation of the technical, legal, and cultural differences. The seven countries were selected for experience with siting in crystalline rock, similarity of siting practices to Sweden, and the availability of published information. Local governments have demonstrated effective veto power in each of the seven countries surveyed, although this power is exercised in different ways. This paper shows how the siting strategy itself affects the ability and the inclination of localities to block the project. It shows by example that public involvement, parallel vs. sequential characterization, schedule for siting activities, and the existence of interim waste storage capability have an impact on the success of siting. The focus of this paper is deep geologic disposal. Shallow land disposal and non-radioactive wastes are not discussed in detail, with three exceptions: LLW disposal siting in the U.S. and Canada, and the SAKAB incinerator projects in Sweden. These provide insight into siting approaches and demonstrate that conclusions regarding deep geologic disposal are supported by other experience. (114 refs.) (au)

  6. Project Design Concept for Monitoring and Control System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations

  7. Selection Process of ERP Systems

    OpenAIRE

    Molnár, Bálint; Szabó, Gyula; Benczúr, András

    2013-01-01

    Background: The application and introduction of ERP systems have become a central issue for management and operation of enterprises. The competition on market enforces the improvement and optimization of business processes of enterprises to increase their efficiency, effectiveness, and to manage better the resources outside the company. The primary task of ERP systems is to achieve the before-mentioned objectives. Objective: The selection of a particular ERP system has a decisive effect on th...

  8. System engineering and science projects: lessons from MeerKAT

    Science.gov (United States)

    Kapp, Francois

    2016-08-01

    The Square Kilometre Array (SKA) is a large science project planning to commence construction of the world's largest Radio Telescope after 2018. MeerKAT is one of the precursor projects to the SKA, based on the same site that will host the SKA Mid array in the central Karoo area of South Africa. From the perspective of signal processing hardware development, we analyse the challenges that MeerKAT encountered and extrapolate them to SKA in order to prepare the System Engineering and Project Management methods that could contribute to a successful completion of SKA. Using the MeerKAT Digitiser, Correlator/Beamformer and Time and Frequency Reference Systems as an example, we will trace the risk profile and subtle differences in engineering approaches of these systems over time and show the effects of varying levels of System Engineering rigour on the evolution of their risk profiles. It will be shown that the most rigorous application of System Engineering discipline resulted in the most substantial reduction in risk over time. Since the challenges faced by SKA are not limited to that of MeerKAT, we also look into how that translates to a system development where there is substantial complexity in both the created system as well as the creating system. Since the SKA will be designed and constructed by consortia made up from the ten member countries, there are many additional complexities to the organisation creating the system - a challenge the MeerKAT project did not encounter. Factors outside of engineering, for instance procurement models and political interests, also play a more significant role, and add to the project risks of SKA when compared to MeerKAT.

  9. INDICATIVE MODEL OF DEVIATIONS IN PROJECT

    Directory of Open Access Journals (Sweden)

    Олена Борисівна ДАНЧЕНКО

    2016-02-01

    Full Text Available The article shows the process of constructing the project deviations indicator model. It based on a conceptual model of project deviations integrated management (PDIM. During the project different causes (such as risks, changes, problems, crises, conflicts, stress lead to deviations of integrated project indicators - time, cost, quality, and content. For a more detailed definition of where in the project deviations occur and how they are dangerous for the whole project, it needs to develop an indicative model of project deviations. It allows identifying the most dangerous deviations that require PDIM. As a basis for evaluation of project's success has been taken famous model IPMA Delta. During the evaluation, IPMA Delta estimated project management competence of organization in three modules: I-Module ("Individuals" - a self-assessment personnel, P-module ("Projects" - self-assessment of projects and/or programs, and O-module ("Organization" - used to conduct interviews with selected people during auditing company. In the process of building an indicative model of deviations in the project, the first step is the assessment of project management in the organization by IPMA Delta. In the future, built cognitive map and matrix of system interconnections of the project, which conducted simulations and built a scale of deviations for the selected project. They determined a size and place of deviations. To identify the detailed causes of deviations in the project management has been proposed to use the extended system of indicators, which is based on indicators of project management model Project Excellence. The proposed indicative model of deviations in projects allows to estimate the size of variation and more accurately identify the place of negative deviations in the project and provides the project manager information for operational decision making for the management of deviations in the implementation of the project

  10. Study of system safety evaluation on LTO of national project. NISA safety research project on system safety of nuclear power plants

    International Nuclear Information System (INIS)

    Takizawa, Masayuki; Sekimura, Naoto; Miyano, Hiroshi; Aoyama, Katsunobu

    2012-01-01

    Japanese safety regulatory body, that is, Nuclear and Industrial Safety Agency (NISA) started a 5-year national safety research project as 'the first stage' from 2006 FY to 2010 FY whose objective is 'Improve the technical information basis in order to utilize knowledge as well as information related to ageing management and maintenance of NPPs. Fukushima disaster happened in March 2011, and the priority of research needs for ageing management dramatically changed in Japan. The second-stage national project started in October 2011 with the concept of 'system safety' of NNPs where not only ageing management on degradation phenomena of important components but also safety management on total plant systems are paid attention to. The second-stage project is so called 'Japanese Ageing Management Program for System Safety (JAMPSS)'. (author)

  11. Analytical simulation platform describing projections in computed tomography systems

    International Nuclear Information System (INIS)

    Youn, Hanbean; Kim, Ho Kyung

    2013-01-01

    To reduce the patient dose, several approaches such as spectral imaging using photon counting detectors and statistical image reconstruction, are being considered. Although image-reconstruction algorithms may significantly enhance image quality in reconstructed images with low dose, true signal-to-noise properties are mainly determined by image quality in projections. We are developing an analytical simulation platform describing projections to investigate how quantum-interaction physics in each component configuring CT systems affect image quality in projections. This simulator will be very useful for an improved design or optimization of CT systems in economy as well as the development of novel image-reconstruction algorithms. In this study, we present the progress of development of the simulation platform with an emphasis on the theoretical framework describing the generation of projection data. We have prepared the analytical simulation platform describing projections in computed tomography systems. The remained further study before the meeting includes the following: Each stage in the cascaded signal-transfer model for obtaining projections will be validated by the Monte Carlo simulations. We will build up energy-dependent scatter and pixel-crosstalk kernels, and show their effects on image quality in projections and reconstructed images. We will investigate the effects of projections obtained from various imaging conditions and system (or detector) operation parameters on reconstructed images. It is challenging to include the interaction physics due to photon-counting detectors into the simulation platform. Detailed descriptions of the simulator will be presented with discussions on its performance and limitation as well as Monte Carlo validations. Computational cost will also be addressed in detail. The proposed method in this study is simple and can be used conveniently in lab environment

  12. ARTIFICIAL NEURAL NETWORKS BASED GEARS MATERIAL SELECTION HYBRID INTELLIGENT SYSTEM

    Institute of Scientific and Technical Information of China (English)

    X.C. Li; W.X. Zhu; G. Chen; D.S. Mei; J. Zhang; K.M. Chen

    2003-01-01

    An artificial neural networks(ANNs) based gear material selection hybrid intelligent system is established by analyzing the individual advantages and weakness of expert system (ES) and ANNs and the applications in material select of them. The system mainly consists of tow parts: ES and ANNs. By being trained with much data samples,the back propagation (BP) ANN gets the knowledge of gear materials selection, and is able to inference according to user input. The system realizes the complementing of ANNs and ES. Using this system, engineers without materials selection experience can conveniently deal with gear materials selection.

  13. Multi-criteria decision-making in the selection of a renewable energy project in spain: The Vikor method

    International Nuclear Information System (INIS)

    San Cristobal, J.R.

    2011-01-01

    One of the characteristics of the Spanish energy system is its high degree of dependence on imports. In 2005, the Spanish government approved the new Renewable Energy Plan in the following sectors: Windpower, Hydroelectric, Solar Thermal, Solar Thermo-electric, Photovoltaic, Biomass, Biogas and Biofuels. The aim of the Plan is to make it possible to reach the target of 12% of primary energy being met from renewable sources by 2010. When selecting one from various Renewable Energy investment projects different groups of decision-makers become involved in the process. Decision-making has to take into consideration several conflicting objectives because of the increasingly complex social, economic, technological, and environmental factors that are present. Traditional single-criterion decision-making is no longer able to handle these problems. The Compromise Ranking method, also known as the VIKOR method, introduces the Multi-criteria ranking index based on the particular measure of ''closeness'' to the ''ideal'' solution. In this paper, we apply the method in the selection of a Renewable Energy project corresponding to the Renewable Energy Plan launched by the Spanish Government. The method is combined with the Analytical Hierarchy Process method for weighting the importance of the different criteria, which allows decision-makers to assign these values based on their preferences. The results show that the Biomass plant option (Co-combustion in a conventional power plant) is the best choice, followed by the Wind power and Solar Thermo-electric alternatives. (author)

  14. Project selection problem under uncertainty: An application of utility theory and chance constrained programming to a real case

    Directory of Open Access Journals (Sweden)

    Reza Hosnavi Atashgah

    2013-06-01

    Full Text Available Selecting from a pool of interdependent projects under certainty, when faced with resource constraints, has been studied well in the literature of project selection problem. After briefly reviewing and discussing popular modeling approaches for dealing with uncertainty, this paper proposes an approach based on chance constrained programming and utility theory for a certain range of problems and under some practical assumptions. Expected Utility Programming, as the proposed modeling approach, will be compared with other well-known methods and its meaningfulness and usefulness will be illustrated via two numerical examples and one real case.

  15. Risk Management System and Project Staff Education Program for Overseas Construction Project Using the Expert System

    OpenAIRE

    Hirota, Yoichi

    2007-01-01

    The turnover of the Japanese contractors and the consulting firms has kept the same level since 1983, in spite of the fact that the size of domestic market is shrinking. This is why they do not have a proper management system, especially risk management system for the overseas construction projects. This study aims at building risk management system and developing education program that can be applied to reinforcing the ability, based on the author’s experience. Risk is defined as “uncertain ...

  16. ERP systems selection in multinational enterprises: a practical guide

    OpenAIRE

    Moutaz Haddara

    2018-01-01

    The Enterprise Resource Planning (ERP) system selection is an early phase in the ERP adoption process. When organizations evaluate an ERP, they commonly develop their own selection criteria that usually involve various system and vendor related factors. While the selection process is critical, however, there is an apparent research gap in literature. The ERP selection effort also focuses on the system’s fit with the organizational requirements and needs. Thus, the selection phase is critical,...

  17. Proposal for Land Consolidation Project Solutions for Selected Problem Areas

    Science.gov (United States)

    Wojcik-Len, Justyna; Strek, Zanna

    2017-12-01

    One of the economic tools for supporting agricultural policy are the activities implemented under the Rural Development Program (RDP). By encouraging agricultural activities and creating equal opportunities for development of farms, among others in areas with unfavourable environmental conditions characterized by low productivity of soils exposed to degradation, decision makers can contribute to improving the spatial structure of rural areas. In Poland, one of the major concerns are agricultural problem areas (regions). In view of this situation, the aim of this article was to characterize the problem areas in question and propose land consolidation project solutions for selected fragments of those areas. This paper presents the results of a review of literature and an analysis of geodetic and cartographic data regarding the problem areas. The process of land consolidation, which is one of the technical and legal instruments supporting the development of rural areas, was characterized. The study allowed the present authors to establish criteria for selecting agricultural problem areas for land consolidation. To develop a proposal for rational management of the problem areas, key general criteria (location, topography, soil quality and usefulness) and specific criteria were defined and assigned weights. A conception of alternative development of the agricultural problem areas was created as part of a land consolidation project. The results were used to create a methodology for the development of agricultural problem areas to be employed during land consolidation in rural areas. Every agricultural space includes areas with unfavourable environmental and soil conditions determined by natural or anthropogenic factors. Development of agricultural problem areas through land consolidation should take into account the specific functions assigned to these areas in land use plans, as well as to comply with legal regulations.

  18. Research on calibration algorithm in laser scanning projection system

    Science.gov (United States)

    Li, Li Juan; Qu, Song; Hou, Mao Sheng

    2017-10-01

    Laser scanning projection technology can project the image defined by the existing CAD digital model to the working surface, in the form of a laser harness profile. This projection is in accordance with the ratio of 1: 1. Through the laser harness contours with high positioning quality, the technical staff can carry out the operation with high precision. In a typical process of the projection, in order to determine the relative positional relationship between the laser projection instrument and the target, it is necessary to place several fixed reference points on the projection target and perform the calibration of projection. This position relationship is the transformation from projection coordinate system to the global coordinate system. The entire projection work is divided into two steps: the first step, the calculation of the projector six position parameters is performed, that is, the projector calibration. In the second step, the deflection angle is calculated by the known projector position parameter and the known coordinate points, and then the actual model is projected. Typically, the calibration requires the establishment of six reference points to reduce the possibility of divergence of the nonlinear equations, but the whole solution is very complex and the solution may still diverge. In this paper, the distance is detected combined with the calculation so that the position parameters of the projector can be solved by using the coordinate values of three reference points and the distance of at least one reference point to the projector. The addition of the distance measurement increases the stability of the solution of the nonlinear system and avoids the problem of divergence of the solution caused by the reference point which is directly under the projector. Through the actual analysis and calculation, the Taylor expansion method combined with the least squares method is used to obtain the solution of the system. Finally, the simulation experiment is

  19. THE EVALUATION OF THE IMPLEMENTATION OF CONTRACTOR SAFETY MANAGEMENT SYSTEM (CSMS PROGRAM ON TURNAROUND PROJECT (TA AT PT. PUPUK SRIWIDJAJA (PUSRI PALEMBANG

    Directory of Open Access Journals (Sweden)

    Muhammad Arif

    2016-03-01

    Full Text Available Background :Turnaround is one of the done by contractor in which if it is not managed well, it could cause work accident. The purpose of this study was to evaluate the implementation of contractor safety management system (CSMS program on turnaround project at PT. Pupuk Sriwidjaja Palembang. Method : This study was a qualitative study. The information was obtained from deep interview, observation and the study of document. The data was analyzed by using content analysis. The validity of the instruments was tested through triangulation of sources, method and data Result : The program implementation Contractor Safety Management System (CSMS on a turnaround project is already well underway only on projects in addition to departments turnaround K3 & LH less involved in the risk assessment stage, pre-qualification and selection of contractors. Conclusion : The implementation of the program Contractor Safety Management System (CSMS on a turnaround project at PT. Pupuk Sriwidjaja Palembang are in accordance with the Code of Labor Management Health, Safety and Environmental Protection Contractor BPMIGAS. It is advisable to PT. Pupuk Sriwidjaja Palembang in order to improve communication between departments procure goods and services with K3 and LH-related departments work tendered as the risk assessment stage, pre-qualification and selection on work tendered. Need sanctions against contractors who do not regularly report performance data K3.

  20. Survey and analysis of selected jointly owned large-scale electric utility storage projects

    Energy Technology Data Exchange (ETDEWEB)

    1982-05-01

    The objective of this study was to examine and document the issues surrounding the curtailment in commercialization of large-scale electric storage projects. It was sensed that if these issues could be uncovered, then efforts might be directed toward clearing away these barriers and allowing these technologies to penetrate the market to their maximum potential. Joint-ownership of these projects was seen as a possible solution to overcoming the major barriers, particularly economic barriers, of commercializaton. Therefore, discussions with partners involved in four pumped storage projects took place to identify the difficulties and advantages of joint-ownership agreements. The four plants surveyed included Yards Creek (Public Service Electric and Gas and Jersey Central Power and Light); Seneca (Pennsylvania Electric and Cleveland Electric Illuminating Company); Ludington (Consumers Power and Detroit Edison, and Bath County (Virginia Electric Power Company and Allegheny Power System, Inc.). Also investigated were several pumped storage projects which were never completed. These included Blue Ridge (American Electric Power); Cornwall (Consolidated Edison); Davis (Allegheny Power System, Inc.) and Kttatiny Mountain (General Public Utilities). Institutional, regulatory, technical, environmental, economic, and special issues at each project were investgated, and the conclusions relative to each issue are presented. The major barriers preventing the growth of energy storage are the high cost of these systems in times of extremely high cost of capital, diminishing load growth and regulatory influences which will not allow the building of large-scale storage systems due to environmental objections or other reasons. However, the future for energy storage looks viable despite difficult economic times for the utility industry. Joint-ownership can ease some of the economic hardships for utilites which demonstrate a need for energy storage.

  1. An Objective Approach to Select Climate Scenarios when Projecting Species Distribution under Climate Change.

    Directory of Open Access Journals (Sweden)

    Nicolas Casajus

    Full Text Available An impressive number of new climate change scenarios have recently become available to assess the ecological impacts of climate change. Among these impacts, shifts in species range analyzed with species distribution models are the most widely studied. Whereas it is widely recognized that the uncertainty in future climatic conditions must be taken into account in impact studies, many assessments of species range shifts still rely on just a few climate change scenarios, often selected arbitrarily. We describe a method to select objectively a subset of climate change scenarios among a large ensemble of available ones. Our k-means clustering approach reduces the number of climate change scenarios needed to project species distributions, while retaining the coverage of uncertainty in future climate conditions. We first show, for three biologically-relevant climatic variables, that a reduced number of six climate change scenarios generates average climatic conditions very close to those obtained from a set of 27 scenarios available before reduction. A case study on potential gains and losses of habitat by three northeastern American tree species shows that potential future species distributions projected from the selected six climate change scenarios are very similar to those obtained from the full set of 27, although with some spatial discrepancies at the edges of species distributions. In contrast, projections based on just a few climate models vary strongly according to the initial choice of climate models. We give clear guidance on how to reduce the number of climate change scenarios while retaining the central tendencies and coverage of uncertainty in future climatic conditions. This should be particularly useful during future climate change impact studies as more than twice as many climate models were reported in the fifth assessment report of IPCC compared to the previous one.

  2. An Objective Approach to Select Climate Scenarios when Projecting Species Distribution under Climate Change.

    Science.gov (United States)

    Casajus, Nicolas; Périé, Catherine; Logan, Travis; Lambert, Marie-Claude; de Blois, Sylvie; Berteaux, Dominique

    2016-01-01

    An impressive number of new climate change scenarios have recently become available to assess the ecological impacts of climate change. Among these impacts, shifts in species range analyzed with species distribution models are the most widely studied. Whereas it is widely recognized that the uncertainty in future climatic conditions must be taken into account in impact studies, many assessments of species range shifts still rely on just a few climate change scenarios, often selected arbitrarily. We describe a method to select objectively a subset of climate change scenarios among a large ensemble of available ones. Our k-means clustering approach reduces the number of climate change scenarios needed to project species distributions, while retaining the coverage of uncertainty in future climate conditions. We first show, for three biologically-relevant climatic variables, that a reduced number of six climate change scenarios generates average climatic conditions very close to those obtained from a set of 27 scenarios available before reduction. A case study on potential gains and losses of habitat by three northeastern American tree species shows that potential future species distributions projected from the selected six climate change scenarios are very similar to those obtained from the full set of 27, although with some spatial discrepancies at the edges of species distributions. In contrast, projections based on just a few climate models vary strongly according to the initial choice of climate models. We give clear guidance on how to reduce the number of climate change scenarios while retaining the central tendencies and coverage of uncertainty in future climatic conditions. This should be particularly useful during future climate change impact studies as more than twice as many climate models were reported in the fifth assessment report of IPCC compared to the previous one.

  3. Projective and hybrid projective synchronization for the Lorenz-Stenflo system with estimation of unknown parameters

    International Nuclear Information System (INIS)

    Mukherjee, Payel; Banerjee, Santo

    2010-01-01

    In this work, in the first phase, we study the phenomenon of projective synchronization in the Lorenz-Stenflo system. Synchronization is then investigated for the same system with unknown parameters. We show analytically that synchronization is possible for some proper choice of the nonlinear controller by using a suitable Lyapunov function. With the help of this result, it is also possible to estimate the values of the unknown system parameters. In the second phase as an extension of our analysis, we investigate the new hybrid projective synchronization for the same system. All our analyses are well supported with numerical evidence.

  4. System Design and Engineering, lubricating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    This text book introduces systems engineering for designing systems in multidisciplinary projects. First an overview of the systems engineering process is given. Several systems thinking tracks are presented, to think about the system in a number of ways, its context, its user, its functionality,

  5. Sensor Selection method for IoT systems – focusing on embedded system requirements

    Directory of Open Access Journals (Sweden)

    Hirayama Masayuki

    2016-01-01

    Full Text Available Recently, various types of sensors have been developed. Using these sensors, IoT systems have become hot topics in embedded system domain. However, sensor selections for embedded systems are not well discussed up to now. This paper focuses on embedded system’s features and architecture, and proposes a sensor selection method which is composed seven steps. In addition, we applied the proposed method to a simple example – a sensor selection for computer scored answer sheet reader unit. From this case study, an idea to use FTA in sensor selection is also discussed.

  6. White Pine Co. Public School System Biomass Conversion Heating Project

    Energy Technology Data Exchange (ETDEWEB)

    Paul Johnson

    2005-11-01

    The White Pine County School District and the Nevada Division of Forestry agreed to develop a pilot project for Nevada using wood chips to heat the David E. Norman Elementary School in Ely, Nevada. Consideration of the project was triggered by a ''Fuels for Schools'' grant that was brought to the attention of the School District. The biomass project that was part of a district-wide energy retrofit, called for the installation of a biomass heating system for the school, while the current fuel oil system remained as back-up. Woody biomass from forest fuel reduction programs will be the main source of fuel. The heating system as planned and completed consists of a biomass steam boiler, storage facility, and an area for unloading and handling equipment necessary to deliver and load fuel. This was the first project of it's kind in Nevada. The purpose of the DOE funded project was to accomplish the following goals: (1) Fuel Efficiency: Purchase and install a fuel efficient biomass heating system. (2) Demonstration Project: Demonstrate the project and gather data to assist with further research and development of biomass technology; and (3) Education: Educate the White Pine community and others about biomass and other non-fossil fuels.

  7. DOE Heat Pump Centered Integrated Community Energy Systems Project

    Energy Technology Data Exchange (ETDEWEB)

    Calm, J. M.

    1979-01-01

    The Heat Pump Centered Integrated Community Energy Systems (HP-ICES) Project is a multiphase undertaking seeking to demonstrate one or more operational HP-ICES by the end of 1983. The seven phases include System Development, Demonstration Design, Design Completion, HP-ICES Construction, Operation and Data Acquisition, HP-ICES Evaluation, and Upgraded Continuation. This project is sponsored by the Community Systems Branch, Office of Buildings and Community Systems, Assistant Secretary for Conservation and Solar Applicaions, U.S. Department of Energy (DOE). It is part of the Community Systems Program and is managed by the Energy and Environmental Systems Division of Argonne Natinal Laboratory.

  8. Implementation of Computer Assisted Test Selection System in Local Governments

    Directory of Open Access Journals (Sweden)

    Abdul Azis Basri

    2016-05-01

    Full Text Available As an evaluative way of selection of civil servant system in all government areas, Computer Assisted Test selection system was started to apply in 2013. In phase of implementation for first time in all areas in 2014, this system selection had trouble in several areas, such as registration procedure and passing grade. The main objective of this essay was to describe implementation of new selection system for civil servants in the local governments and to seek level of effectiveness of this selection system. This essay used combination of study literature and field survey which data collection was made by interviews, observations, and documentations from various sources, and to analyze the collected data, this essay used reduction, display data and verification for made the conclusion. The result of this essay showed, despite there a few parts that be problem of this system such as in the registration phase but almost all phases of implementation of CAT selection system in local government areas can be said was working clearly likes in preparation, implementation and result processing phase. And also this system was fulfilled two of three criterias of effectiveness for selection system, they were accuracy and trusty. Therefore, this selection system can be said as an effective way to select new civil servant. As suggestion, local governments have to make prime preparation in all phases of test and make a good feedback as evaluation mechanism and together with central government to seek, fix and improve infrastructures as supporting tool and competency of local residents.

  9. Notes on nonlocal projective measurements in relativistic systems

    International Nuclear Information System (INIS)

    Lin, Shih-Yuin

    2014-01-01

    In quantum mechanical bipartite systems, naive extensions of von Neumann’s projective measurement to nonlocal variables can produce superluminal signals and thus violate causality. We analyze the projective quantum nondemolition state-verification in a two-spin system and see how the projection introduces nonlocality without entanglement. For the ideal measurements of “R-nonlocal” variables, we argue that causality violation can be resolved by introducing further restrictions on the post-measurement states, which makes the measurement “Q-nonlocal”. After we generalize these ideas to quantum mechanical harmonic oscillators, we look into the projective measurements of the particle number of a single mode or a wave-packet of a relativistic quantum field in Minkowski space. It turns out that the causality-violating terms in the expectation values of the local operators, generated either by the ideal measurement of the “R-nonlocal” variable or the quantum nondemolition verification of a Fock state, are all suppressed by the IR and UV cutoffs of the theory. Thus relativistic quantum field theories with such projective measurements are effectively causal

  10. Projects management in organization on the selected example

    OpenAIRE

    A. Kania; M. Spilka; S. Griner

    2013-01-01

    Purpose: In this paper stages of project management taking into consideration many useful tools and methods were presented. The quality management in the project, the risk estimation, costs of the project realization and many others were discussed. The analysis of project management of an element using in an automotive industry was carried out.Design/methodology/approach: In this article classification of the projects was presented. The stages of project management and relations among them we...

  11. 46 CFR 108.404 - Selection of fire detection system.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Selection of fire detection system. 108.404 Section 108... DESIGN AND EQUIPMENT Fire Extinguishing Systems § 108.404 Selection of fire detection system. (a) If a... space. (b) The fire detection system must be designed to minimize false alarms. ...

  12. Exploration Medical System Demonstration Project

    Science.gov (United States)

    Chin, D. A.; McGrath, T. L.; Reyna, B.; Watkins, S. D.

    2011-01-01

    A near-Earth Asteroid (NEA) mission will present significant new challenges including hazards to crew health created by exploring a beyond low earth orbit destination, traversing the terrain of asteroid surfaces, and the effects of variable gravity environments. Limited communications with ground-based personnel for diagnosis and consultation of medical events require increased crew autonomy when diagnosing conditions, creating treatment plans, and executing procedures. Scope: The Exploration Medical System Demonstration (EMSD) project will be a test bed on the International Space Station (ISS) to show an end-to-end medical system assisting the Crew Medical Officers (CMO) in optimizing medical care delivery and medical data management during a mission. NEA medical care challenges include resource and resupply constraints limiting the extent to which medical conditions can be treated, inability to evacuate to Earth during many mission phases, and rendering of medical care by a non-clinician. The system demonstrates the integration of medical technologies and medical informatics tools for managing evidence and decision making. Project Objectives: The objectives of the EMSD project are to: a) Reduce and possibly eliminate the time required for a crewmember and ground personnel to manage medical data from one application to another. b) Demonstrate crewmember's ability to access medical data/information via a software solution to assist/aid in the treatment of a medical condition. c) Develop a common data management architecture that can be ubiquitously used to automate repetitive data collection, management, and communications tasks for all crew health and life sciences activities. d) Develop a common data management architecture that allows for scalability, extensibility, and interoperability of data sources and data users. e) Lower total cost of ownership for development and sustainment of peripheral hardware and software that use EMSD for data management f) Provide

  13. Optimistic Selection Rule Better Than Majority Voting System

    Science.gov (United States)

    Sugiyama, Takuya; Obata, Takuya; Hoki, Kunihito; Ito, Takeshi

    A recently proposed ensemble approach to game-tree search has attracted a great deal of attention. The ensemble system consists of M computer players, where each player uses a different series of pseudo-random numbers. A combination of multiple players under the majority voting system would improve the performance of a Shogi-playing computer. We present a new strategy of move selection based on the search values of a number of players. The move decision is made by selecting one player from all M players. Each move is selected by referring to the evaluation value of the tree search of each player. The performance and mechanism of the strategy are examined. We show that the optimistic selection rule, which selects the player that yields the highest evaluation value, outperforms the majority voting system. By grouping 16 or more computer players straightforwardly, the winning rates of the strongest Shogi programs increase from 50 to 60% or even higher.

  14. A project management quality cost information system for the construction industry

    OpenAIRE

    Love, PED; Irani, Z

    2003-01-01

    A prototype Project Management Quality Cost System (PROMQACS) was developed to determine quality costs in construction projects. The structure and information requirements that are needed to provide a classification system of quality costs were identified and discussed. The developed system was tested and implemented in two case study construction projects to determine the information and management issues needed to develop PROMQACS into a software program. In addition, the system was used to...

  15. Integrated project management information systems: the French nuclear industry experience

    International Nuclear Information System (INIS)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-01-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK)

  16. Integrated project management information systems: the French nuclear industry experience

    Energy Technology Data Exchange (ETDEWEB)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-03-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK).

  17. Selecting healthcare information systems provided by third-party vendors: a mind map beyond the manuals.

    Science.gov (United States)

    Gortzis, Lefteris G

    2010-01-01

    The selection of a new healthcare information system (HIS) has always been a daunting process for clinicians, health care providers and policy makers. The objective of this study is to present the lessons learned and the main findings from several relevant case studies to support this process. Data were collected by retrospectively reviewing the summative results of three well-established systems, acquiring feedback from two E.U. projects, and conducting semi-structured interviews with a number of collaborators involved in electronic healthcare interventions. Selection issues were identified and classified into the following five categories: (i) data creation, (ii) data management, (iii) data sharing, (iv) data presentation and (v) modules management. A mind map was also structured to provide a more manageable list of issues concerning the most common electronic clinical technologies (e-CT). The vendor manual is intended as an overview of the merchandise e-CT and therefore has limited potential in supporting effectively the selection process of a new HIS. The present classification and the mind map - based on lessons learned - provide a ready-to-use toolkit for supporting the HIS selection process when healthcare organisations are unable to employ research development groups to lay the groundwork for building a new HIS from scratch.

  18. Short communication: Genomic selection in a crossbred cattle population using data from the Dairy Genetics East Africa Project.

    Science.gov (United States)

    Brown, A; Ojango, J; Gibson, J; Coffey, M; Okeyo, M; Mrode, R

    2016-09-01

    Due to the absence of accurate pedigree information, it has not been possible to implement genetic evaluations for crossbred cattle in African small-holder systems. Genomic selection techniques that do not rely on pedigree information could, therefore, be a useful alternative. The objective of this study was to examine the feasibility of using genomic selection techniques in a crossbred cattle population using data from Kenya provided by the Dairy Genetics East Africa Project. Genomic estimated breeding values for milk yield were estimated using 2 prediction methods, GBLUP and BayesC, and accuracies were calculated as the correlation between yield deviations and genomic breeding values included in the estimation process, mimicking the situation for young bulls. The accuracy of evaluation ranged from 0.28 to 0.41, depending on the validation population and prediction method used. No significant differences were found in accuracy between the 2 prediction methods. The results suggest that there is potential for implementing genomic selection for young bulls in crossbred small-holder cattle populations, and targeted genotyping and phenotyping should be pursued to facilitate this. Copyright © 2016 American Dairy Science Association. Published by Elsevier Inc. All rights reserved.

  19. Research and Development Project Selection Methods at the Air Force Wright Aeronautical Laboratories.

    Science.gov (United States)

    1985-09-01

    personal and telephone interviews. Ten individuals from each of the four AFWAL Laboratories were interrviewed. The results illustrated that few of the...680). Aaker and Tyebee. 1978. The authors constructed a model that dealt with the selection of interdependent R&D projects. The model covers three...of this research effort. Scope * The data collection method used in this study consisted of a combination of personal and telephone interviews. The

  20. SE Capstone Project: Building Systems Engineering Education and Workforce Capacity

    Science.gov (United States)

    2012-04-01

    This project developed a system to improve fuel efficiency by means of regenerative braking . The team designed a simple system that allows "bolt-on...air traffic control, social networking, credit/debit cards, and anti-lock brakes are only a few functions enabled by complex systems of systems . We...Building Systems Engineering Education and Workforce Capacity SE Capstone Project APRIL 2012 Report Documentation Page Form ApprovedOMB No. 0704

  1. Personnel Selection Influences on Remotely Piloted Aircraft Human-System Integration.

    Science.gov (United States)

    Carretta, Thomas R; King, Raymond E

    2015-08-01

    Human-system integration (HSI) is a complex process used to design and develop systems that integrate human capabilities and limitations in an effective and affordable manner. Effective HSI incorporates several domains, including manpower, personnel and training, human factors, environment, safety, occupational health, habitability, survivability, logistics, intelligence, mobility, and command and control. To achieve effective HSI, the relationships among these domains must be considered. Although this integrated approach is well documented, there are many instances where it is not followed. Human factors engineers typically focus on system design with little attention to the skills, abilities, and other characteristics needed by human operators. When problems with fielded systems occur, additional training of personnel is developed and conducted. Personnel selection is seldom considered during the HSI process. Complex systems such as aviation require careful selection of the individuals who will interact with the system. Personnel selection is a two-stage process involving select-in and select-out procedures. Select-in procedures determine which candidates have the aptitude to profit from training and represent the best investment. Select-out procedures focus on medical qualification and determine who should not enter training for medical reasons. The current paper discusses the role of personnel selection in the HSI process in the context of remotely piloted aircraft systems.

  2. Technology Investments in the NASA Entry Systems Modeling Project

    Science.gov (United States)

    Barnhardt, Michael; Wright, Michael; Hughes, Monica

    2017-01-01

    The Entry Systems Modeling (ESM) technology development project, initiated in 2012 under NASAs Game Changing Development (GCD) Program, is engaged in maturation of fundamental research developing aerosciences, materials, and integrated systems products for entry, descent, and landing(EDL)technologies [1]. To date, the ESM project has published over 200 papers in these areas, comprising the bulk of NASAs research program for EDL modeling. This presentation will provide an overview of the projects successes and challenges, and an assessment of future investments in EDL modeling and simulation relevant to NASAs mission

  3. System Engineering Management and Implementation Plan for Project W-211, ''Initial Tank Retrieval Systems'' (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211

  4. System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    Energy Technology Data Exchange (ETDEWEB)

    VAN BEEK, J.E.

    2000-05-05

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

  5. Project for qualification of the Kozloduy confinement system

    International Nuclear Information System (INIS)

    Montes Rodriguez, J.L.

    1993-01-01

    One of the projects awarded to Empresarios Agrupados within the Six-Month WANO Programme for Kozloduy NPP, financed through the European Community's PHARE Programme, relates to the first tasks of plant confinement system qualification. Development of this project - the results of which will serve as a reference for other power plants with VVER-440/230 models - aroused considerable interest in the Bulgarian nuclear community as well as in international entities which render assistance to Eastern power plants. In fact, this is one of the few projects in the programme which takes into account hardware-oriented activities to be carried out urgently in the plant. The VVER-440/230 confinement system performs functions parallel to the containment system of Western PWR reactors. However, it differs significantly in its criteria and operation details. These important differences form the basis for a rational and prudent application of the essence of Western codes and standards relating to the qualification of these systems. The criteria which are developed to make this application viable constitute the most challenging and, at the same time, most risky part of this job. The project will be in its final stages when the 18th Annual Meeting of the Spanish Nuclear Society is held; it is therefore likely that this paper will advance the results and conclusions expected. (author)

  6. Majoring in Information Systems: Reasons Why Students Select (or Not) Information Systems as a Major

    Science.gov (United States)

    Snyder, Johnny; Slauson, Gayla Jo

    2014-01-01

    Filling the pipeline for information systems workers is critical in the information era. Projected growth rates for jobs requiring information systems expertise are significantly higher than the projected growth rates for other jobs. Why then do relatively few students choose to major in information systems? This paper reviews survey results from…

  7. The utility of Geographical Information Systems (GIS) in systems-oriented obesity intervention projects: The selection of comparable study sites for a quasi-experimental intervention design--TX CORD

    Science.gov (United States)

    The Texas Childhood Obesity Research Demonstration project (TX CORD) uses a systems-oriented approach to address obesity that includes individual and family interventions, community-level action, as well as environmental and policy initiatives. Given that randomization is seldom possible in communit...

  8. Controlled cooling of an electronic system based on projected conditions

    Science.gov (United States)

    David, Milnes P.; Iyengar, Madhusudan K.; Schmidt, Roger R.

    2015-08-18

    Energy efficient control of a cooling system cooling an electronic system is provided based, in part, on projected conditions. The control includes automatically determining an adjusted control setting(s) for an adjustable cooling component(s) of the cooling system. The automatically determining is based, at least in part, on projected power consumed by the electronic system at a future time and projected temperature at the future time of a heat sink to which heat extracted is rejected. The automatically determining operates to reduce power consumption of the cooling system and/or the electronic system while ensuring that at least one targeted temperature associated with the cooling system or the electronic system is within a desired range. The automatically determining may be based, at least in part, on an experimentally obtained model(s) relating the targeted temperature and power consumption of the adjustable cooling component(s) of the cooling system.

  9. Tank waste remediation system year 2000 dedicated file server project HNF-3418 project plan

    International Nuclear Information System (INIS)

    SPENCER, S.G.

    1999-01-01

    The Server Project is to ensure that all TWRS supporting hardware (fileservers and workstations) will not cause a system failure because of the BIOS or Operating Systems cannot process Year 2000 dates

  10. Tank waste remediation system year 2000 dedicated file server project HNF-3418 project plan

    Energy Technology Data Exchange (ETDEWEB)

    SPENCER, S.G.

    1999-04-26

    The Server Project is to ensure that all TWRS supporting hardware (fileservers and workstations) will not cause a system failure because of the BIOS or Operating Systems cannot process Year 2000 dates.

  11. Selecting a silvicultural system

    Science.gov (United States)

    Richard M. Godman

    1992-01-01

    Sometimes a name creates a problem. The name of a silvicultural system usually refers to the way a stand is cut to get regeneration-"single tree selection"-for example. Trouble is, the name suggests that the regeneration cut will be the first treatment applied to the stand. Not so. We are now mostly making "intermediate" cuts in our Lake States...

  12. Modified scaling function projective synchronization of chaotic systems

    International Nuclear Information System (INIS)

    Xu Yu-Hua; Zhou Wu-Neng; Fang Jian-An

    2011-01-01

    This paper investigates a kind of modified scaling function projective synchronization of uncertain chaotic systems using an adaptive controller. The given scaling function in the new method can be an equilibrium point, a periodic orbit, or even a chaotic attractor in the phase space. Based on LaSalle's invariance set principle, the adaptive control law is derived to make the states of two chaotic systems function projective synchronized. Some numerical examples are also given to show the effectiveness of the proposed method. (general)

  13. Adaptive Equalizer Using Selective Partial Update Algorithm and Selective Regressor Affine Projection Algorithm over Shallow Water Acoustic Channels

    Directory of Open Access Journals (Sweden)

    Masoumeh Soflaei

    2014-01-01

    Full Text Available One of the most important problems of reliable communications in shallow water channels is intersymbol interference (ISI which is due to scattering from surface and reflecting from bottom. Using adaptive equalizers in receiver is one of the best suggested ways for overcoming this problem. In this paper, we apply the family of selective regressor affine projection algorithms (SR-APA and the family of selective partial update APA (SPU-APA which have low computational complexity that is one of the important factors that influences adaptive equalizer performance. We apply experimental data from Strait of Hormuz for examining the efficiency of the proposed methods over shallow water channel. We observe that the values of the steady-state mean square error (MSE of SR-APA and SPU-APA decrease by 5.8 (dB and 5.5 (dB, respectively, in comparison with least mean square (LMS algorithm. Also the families of SPU-APA and SR-APA have better convergence speed than LMS type algorithm.

  14. Boundary Spanning in Offshored Information Systems Development Projects

    Science.gov (United States)

    Krishnan, Poornima

    2010-01-01

    Recent growth in offshore outsourcing of information systems (IS) services is accompanied by managing the offshore projects successfully. Much of the project failures can be attributed to geographic and organizational boundaries which create differences in culture, language, work patterns, and decision making processes among the offshore project…

  15. 50 CFR 86.61 - What process does the Service use to select projects for grants?

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false What process does the Service use to....61 What process does the Service use to select projects for grants? The Service's Division of Federal... SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION...

  16. Development of a database system for near-future climate change projections under the Japanese National Project SI-CAT

    Science.gov (United States)

    Nakagawa, Y.; Kawahara, S.; Araki, F.; Matsuoka, D.; Ishikawa, Y.; Fujita, M.; Sugimoto, S.; Okada, Y.; Kawazoe, S.; Watanabe, S.; Ishii, M.; Mizuta, R.; Murata, A.; Kawase, H.

    2017-12-01

    Analyses of large ensemble data are quite useful in order to produce probabilistic effect projection of climate change. Ensemble data of "+2K future climate simulations" are currently produced by Japanese national project "Social Implementation Program on Climate Change Adaptation Technology (SI-CAT)" as a part of a database for Policy Decision making for Future climate change (d4PDF; Mizuta et al. 2016) produced by Program for Risk Information on Climate Change. Those data consist of global warming simulations and regional downscaling simulations. Considering that those data volumes are too large (a few petabyte) to download to a local computer of users, a user-friendly system is required to search and download data which satisfy requests of the users. We develop "a database system for near-future climate change projections" for providing functions to find necessary data for the users under SI-CAT. The database system for near-future climate change projections mainly consists of a relational database, a data download function and user interface. The relational database using PostgreSQL is a key function among them. Temporally and spatially compressed data are registered on the relational database. As a first step, we develop the relational database for precipitation, temperature and track data of typhoon according to requests by SI-CAT members. The data download function using Open-source Project for a Network Data Access Protocol (OPeNDAP) provides a function to download temporally and spatially extracted data based on search results obtained by the relational database. We also develop the web-based user interface for using the relational database and the data download function. A prototype of the database system for near-future climate change projections are currently in operational test on our local server. The database system for near-future climate change projections will be released on Data Integration and Analysis System Program (DIAS) in fiscal year 2017

  17. Understanding large social-ecological systems: introducing the SESMAD project

    Directory of Open Access Journals (Sweden)

    Michael Cox

    2014-08-01

    Full Text Available This article introduces the Social-ecological systems meta-analysis database (SESMAD project, which is the project behind the case studies and synthetic articles contained in this special issue of the International Journal of the Commons. SESMAD is an internationally collaborative meta-analysis project that builds on previous seminally synthetic work on small-scale common-pool resource systems conducted at the Workshop in Political Theory and Policy Analysis at Indiana University. This project is guided by the following research question: can the variables found to be important in explaining outcomes on small-scale systems be scaled up to explain outcomes in large-scale environmental governance? In this special issue we report on our findings thus far through a set of case studies of large-scale environmental governance, a paper that describes our conceptual advances, and a paper that compares these five case studies to further examine our central research question.

  18. IAEA safeguards information system re-engineering project (IRP)

    International Nuclear Information System (INIS)

    Whitaker, G.; Becar, J.-M.; Ifyland, N.; Kirkgoeze, R.; Koevesd, G.; Szamosi, L.

    2007-01-01

    The Safeguards Information System Re-engineering Project (IRP) was initiated to assist the IAEA in addressing current and future verification and analysis activities through the establishment of a new information technology framework for strengthened and integrated safeguards. The Project provides a unique opportunity to enhance all of the information services for the Department of Safeguards and will require project management 'best practices' to balance limited funds, available resources and Departmental priorities. To achieve its goals, the Project will require the participation of all stakeholders to create a comprehensive and cohesive plan that provides both a flexible and stable foundation for address changing business needs. The expectation is that high quality integrated information systems will be developed that incorporate state-of-the-art technical architectural standards, improved business processes and consistent user interfaces to store various data types in an enterprise data repository which is accessible on-line in a secure environment. (author)

  19. Process for Selecting System Level Assessments for Human System Technologies

    Science.gov (United States)

    Watts, James; Park, John

    2006-01-01

    The integration of many life support systems necessary to construct a stable habitat is difficult. The correct identification of the appropriate technologies and corresponding interfaces is an exhaustive process. Once technologies are selected secondary issues such as mechanical and electrical interfaces must be addressed. The required analytical and testing work must be approached in a piecewise fashion to achieve timely results. A repeatable process has been developed to identify and prioritize system level assessments and testing needs. This Assessment Selection Process has been defined to assess cross cutting integration issues on topics at the system or component levels. Assessments are used to identify risks, encourage future actions to mitigate risks, or spur further studies.

  20. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    DEFF Research Database (Denmark)

    Hudson, Lawrence N; Newbold, Tim; Contu, Sara

    2017-01-01

    The PREDICTS project-Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)-has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity ...

  1. Estimation of volatility of selected oil production projects

    International Nuclear Information System (INIS)

    Costa Lima, Gabriel A.; Suslick, Saul B.

    2006-01-01

    In oil project valuation and investment decision-making, volatility is a key parameter, but it is difficult to estimate. From a traditional investment viewpoint, volatility reduces project value because it increases its discount rate via a higher risk premium. Contrarily, according to the real-option pricing theory, volatility may aggregate value to the project, since the downside potential is limited whereas the upside is theoretically unbounded. However, the estimation of project volatility is very complicated since there is not a historical series of project values. In such cases, many analysts assume that oil price volatility is equal to that of project. In order to overcome such problems, in this paper an alternative numerical method based on present value of future cash flows and Monte Carlo simulation is proposed to estimate the volatility of projects. This method is applied to estimate the volatility of 12 deep-water offshore oil projects considering that oil price will evolve according to one of two stochastic processes: Geometric Brownian Motion and Mean-Reverting Motion. Results indicate that the volatility of commodity usually undervalue that of project. For the set of offshore projects analyzed in this paper, project volatility is at least 79% higher than that of oil prices and increases dramatically in those cases of high capital expenditures and low price. (author)

  2. Selecting RMF Controls for National Security Systems

    Energy Technology Data Exchange (ETDEWEB)

    Witzke, Edward L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-08-01

    In 2014, the United States Department of Defense started tra nsitioning the way it performs risk management and accreditation of informatio n systems to a process entitled Risk Management Framework for DoD Information Technology or RMF for DoD IT. There are many more security and privacy contro ls (and control enhancements) from which to select in RMF, than there w ere in the previous Information Assurance process. This report is an attempt t o clarify the way security controls and enhancements are selected. After a brief overview and comparison of RMF for DoD I T with the previously used process, this report looks at the determination of systems as National Security Systems (NSS). Once deemed to be an NSS, this report addr esses the categorization of the information system with respect to impact level s of the various security objectives and the selection of an initial baseline o f controls. Next, the report describes tailoring the controls through the use of overl ays and scoping considerations. Finally, the report discusses organizatio n-defined values for tuning the security controls to the needs of the information system.

  3. Adaptive projective synchronization of different chaotic systems with nonlinearity inputs

    International Nuclear Information System (INIS)

    Niu Yu-Jun; Pei Bing-Nan; Wang Xing-Yuan

    2012-01-01

    We investigate the projective synchronization of different chaotic systems with nonlinearity inputs. Based on the adaptive technique, sliding mode control method and pole assignment technique, a novel adaptive projective synchronization scheme is proposed to ensure the drive system and the response system with nonlinearity inputs can be rapidly synchronized up to the given scaling factor. (general)

  4. Systems design and engineering : facilitating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    2016-01-01

    As its name implies, the aim of Systems Design and Engineering: Facilitating Multidisciplinary Development Projects is to help systems engineers develop the skills and thought processes needed to successfully develop and implement engineered systems. Such expertise typically does not come through

  5. The Workplace Literacy System Project (WLS). Final Performance Report.

    Science.gov (United States)

    Poulton, Bruce R.

    The Workplace Literacy System Project (WLS) prepared interactive CD-ROM discs containing about 50 hours of instruction and drill in basic skills presented within the context of the textile/apparel manufacturing industry. The project was conducted at a Sara Lee knit products plant in North Carolina. During the project, literacy task analyses were…

  6. The Waste Isolation Pilot Plant (WIPP) integrated project management system

    International Nuclear Information System (INIS)

    Olona, D.; Sala, D.

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP), located 26 miles east of Carlsbad, New Mexico, is a research and development project of the Department of Energy (DOE), tasked with the mission of demonstrating the safe disposal of transuranic (TRU) radioactive wastes. This unique project was authorized by Congress in 1979 in response to the national need for long-term, safe methods for disposing of radioactive by-products from our national defense programs. The WIPP was originally established in December of 1979, by Public Law 96-164, DOE National Security and Military Applications of Nuclear Energy Authorization Act of 1980. Since the inception of the WIPP Project, work has continued to prepare the facility to receive TRU wastes. Studies continue to be conducted to demonstrate the safety of the WIPP facility in accordance with federal and state laws, state agreements, environmental regulations, and DOE Orders. The objectives of implementing an integrated project management system are to assure compliance with all regulatory and federal regulations, identify areas of concern, provide justification for funding, provide a management tool for control of program workscope, and establish a project baseline from which accountability and performance will be assessed. Program management and project controls are essential for the success of the WIPP Project. The WIPP has developed an integrated project management system to establish the process for the control of the program which has an expected total dollar value of $2B over the ten-year period from 1990-2000. The implementation of this project management system was motivated by the regulatory requirements of the project, the highly public environment in which the project takes place, limited funding and resources, and the dynamic nature of the project. Specific areas to be addressed in this paper include strategic planning, project organization, planning and scheduling, fiscal planning, and project monitoring and reporting

  7. Optimal Sensor Selection for Health Monitoring Systems

    Science.gov (United States)

    Santi, L. Michael; Sowers, T. Shane; Aguilar, Robert B.

    2005-01-01

    Sensor data are the basis for performance and health assessment of most complex systems. Careful selection and implementation of sensors is critical to enable high fidelity system health assessment. A model-based procedure that systematically selects an optimal sensor suite for overall health assessment of a designated host system is described. This procedure, termed the Systematic Sensor Selection Strategy (S4), was developed at NASA John H. Glenn Research Center in order to enhance design phase planning and preparations for in-space propulsion health management systems (HMS). Information and capabilities required to utilize the S4 approach in support of design phase development of robust health diagnostics are outlined. A merit metric that quantifies diagnostic performance and overall risk reduction potential of individual sensor suites is introduced. The conceptual foundation for this merit metric is presented and the algorithmic organization of the S4 optimization process is described. Representative results from S4 analyses of a boost stage rocket engine previously under development as part of NASA's Next Generation Launch Technology (NGLT) program are presented.

  8. The Food Early Warning System Project in Somalia

    Directory of Open Access Journals (Sweden)

    Leblanc, M.

    1992-01-01

    Full Text Available The article describes shortly the objectives of a Food Early Warning System (FEWS project, as well as its organisation. The specifie case of Somalia, where the project had to evolve in increasingly difficult situations, and the solutions used so as to preserve the output, are described.

  9. DEVELOPMENT OF A METADATA MANAGEMENT SYSTEM FOR AN INTERDISCIPLINARY RESEARCH PROJECT

    Directory of Open Access Journals (Sweden)

    C. Curdt

    2012-07-01

    Full Text Available In every interdisciplinary, long-term research project it is essential to manage and archive all heterogeneous research data, produced by the project participants during the project funding. This has to include sustainable storage, description with metadata, easy and secure provision, back up, and visualisation of all data. To ensure the accurate description of all project data with corresponding metadata, the design and implementation of a metadata management system is a significant duty. Thus, the sustainable use and search of all research results during and after the end of the project is particularly dependent on the implementation of a metadata management system. Therefore, this paper will describe the practical experiences gained during the development of a scientific research data management system (called the TR32DB including the corresponding metadata management system for the multidisciplinary research project Transregional Collaborative Research Centre 32 (CRC/TR32 'Patterns in Soil-Vegetation-Atmosphere Systems'. The entire system was developed according to the requirements of the funding agency, the user and project requirements, as well as according to recent standards and principles. The TR32DB is basically a combination of data storage, database, and web-interface. The metadata management system was designed, realized, and implemented to describe and access all project data via accurate metadata. Since the quantity and sort of descriptive metadata depends on the kind of data, a user-friendly multi-level approach was chosen to cover these requirements. Thus, the self-developed CRC/TR32 metadata framework is designed. It is a combination of general, CRC/TR32 specific, as well as data type specific properties.

  10. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    NARCIS (Netherlands)

    Hudson, Lawrence N; Newbold, Tim; Contu, Sara; Hill, Samantha L L; Lysenko, Igor; De Palma, Adriana; Phillips, Helen R P; Alhusseini, Tamera I; Bedford, Felicity E; Bennett, Dominic J; Booth, Hollie; Burton, Victoria J; Chng, Charlotte W T; Choimes, Argyrios; Correia, David L P; Day, Julie; Echeverría-Londoño, Susy; Emerson, Susan R; Gao, Di; Garon, Morgan; Harrison, Michelle L K; Ingram, Daniel J; Jung, Martin; Kemp, Victoria; Kirkpatrick, Lucinda; Martin, Callum D; Pan, Yuan; Pask-Hale, Gwilym D; Pynegar, Edwin L; Robinson, Alexandra N; Sanchez-Ortiz, Katia; Senior, Rebecca A; Simmons, Benno I; White, Hannah J; Zhang, Hanbin; Aben, Job; Abrahamczyk, Stefan; Adum, Gilbert B; Aguilar-Barquero, Virginia; Aizen, Marcelo A; Albertos, Belén; Alcala, E L; Del Mar Alguacil, Maria; Alignier, Audrey; Ancrenaz, Marc; Andersen, Alan N; Arbeláez-Cortés, Enrique; Armbrecht, Inge; Arroyo-Rodríguez, Víctor; Aumann, Tom; Axmacher, Jan C; Azhar, Badrul; Azpiroz, Adrián B; Baeten, Lander; Bakayoko, Adama; Báldi, András; Banks, John E; Baral, Sharad K; Barlow, Jos; Barratt, Barbara I P; Barrico, Lurdes; Bartolommei, Paola; Barton, Diane M; Basset, Yves; Batáry, Péter; Bates, Adam J; Baur, Bruno; Bayne, Erin M; Beja, Pedro; Benedick, Suzan; Berg, Åke; Bernard, Henry; Berry, Nicholas J; Bhatt, Dinesh; Bicknell, Jake E; Bihn, Jochen H; Blake, Robin J; Bobo, Kadiri S; Bóçon, Roberto; Boekhout, Teun; Böhning-Gaese, Katrin; Bonham, Kevin J; Borges, Paulo A V; Borges, Sérgio H; Boutin, Céline; Bouyer, Jérémy; Bragagnolo, Cibele; Brandt, Jodi S; Brearley, Francis Q; Brito, Isabel; Bros, Vicenç; Brunet, Jörg; Buczkowski, Grzegorz; Buddle, Christopher M; Bugter, Rob; Buscardo, Erika; Buse, Jörn; Cabra-García, Jimmy; Cáceres, Nilton C; Cagle, Nicolette L; Calviño-Cancela, María; Cameron, Sydney A; Cancello, Eliana M; Caparrós, Rut; Cardoso, Pedro; Carpenter, Dan; Carrijo, Tiago F; Carvalho, Anelena L; Cassano, Camila R; Castro, Helena; Castro-Luna, Alejandro A; Rolando, Cerda B; Cerezo, Alexis; Chapman, Kim Alan; Chauvat, Matthieu; Christensen, Morten; Clarke, Francis M; Cleary, Daniel F R; Colombo, Giorgio; Connop, Stuart P; Craig, Michael D; Cruz-López, Leopoldo; Cunningham, Saul A; D'Aniello, Biagio; D'Cruze, Neil; da Silva, Pedro Giovâni; Dallimer, Martin; Danquah, Emmanuel; Darvill, Ben; Dauber, Jens; Davis, Adrian L V; Dawson, Jeff; de Sassi, Claudio; de Thoisy, Benoit; Deheuvels, Olivier; Dejean, Alain; Devineau, Jean-Louis; Diekötter, Tim; Dolia, Jignasu V; Domínguez, Erwin; Dominguez-Haydar, Yamileth; Dorn, Silvia; Draper, Isabel; Dreber, Niels; Dumont, Bertrand; Dures, Simon G; Dynesius, Mats; Edenius, Lars; Eggleton, Paul; Eigenbrod, Felix; Elek, Zoltán; Entling, Martin H; Esler, Karen J; de Lima, Ricardo F; Faruk, Aisyah; Farwig, Nina; Fayle, Tom M; Felicioli, Antonio; Felton, Annika M; Fensham, Roderick J; Fernandez, Ignacio C; Ferreira, Catarina C; Ficetola, Gentile F; Fiera, Cristina; Filgueiras, Bruno K C; Fırıncıoğlu, Hüseyin K; Flaspohler, David; Floren, Andreas; Fonte, Steven J; Fournier, Anne; Fowler, Robert E; Franzén, Markus; Fraser, Lauchlan H; Fredriksson, Gabriella M; Freire, Geraldo B; Frizzo, Tiago L M; Fukuda, Daisuke; Furlani, Dario; Gaigher, René; Ganzhorn, Jörg U; García, Karla P; Garcia-R, Juan C; Garden, Jenni G; Garilleti, Ricardo; Ge, Bao-Ming; Gendreau-Berthiaume, Benoit; Gerard, Philippa J; Gheler-Costa, Carla; Gilbert, Benjamin; Giordani, Paolo; Giordano, Simonetta; Golodets, Carly; Gomes, Laurens G L; Gould, Rachelle K; Goulson, Dave; Gove, Aaron D; Granjon, Laurent; Grass, Ingo; Gray, Claudia L; Grogan, James; Gu, Weibin; Guardiola, Moisès; Gunawardene, Nihara R; Gutierrez, Alvaro G; Gutiérrez-Lamus, Doris L; Haarmeyer, Daniela H; Hanley, Mick E; Hanson, Thor; Hashim, Nor R; Hassan, Shombe N; Hatfield, Richard G; Hawes, Joseph E; Hayward, Matt W; Hébert, Christian; Helden, Alvin J; Henden, John-André; Henschel, Philipp; Hernández, Lionel; Herrera, James P; Herrmann, Farina; Herzog, Felix; Higuera-Diaz, Diego; Hilje, Branko; Höfer, Hubert; Hoffmann, Anke; Horgan, Finbarr G; Hornung, Elisabeth; Horváth, Roland; Hylander, Kristoffer; Isaacs-Cubides, Paola; Ishida, Hiroaki; Ishitani, Masahiro; Jacobs, Carmen T; Jaramillo, Víctor J; Jauker, Birgit; Hernández, F Jiménez; Johnson, McKenzie F; Jolli, Virat; Jonsell, Mats; Juliani, S Nur; Jung, Thomas S; Kapoor, Vena; Kappes, Heike; Kati, Vassiliki; Katovai, Eric; Kellner, Klaus; Kessler, Michael; Kirby, Kathryn R; Kittle, Andrew M; Knight, Mairi E; Knop, Eva; Kohler, Florian; Koivula, Matti; Kolb, Annette; Kone, Mouhamadou; Kőrösi, Ádám; Krauss, Jochen; Kumar, Ajith; Kumar, Raman; Kurz, David J; Kutt, Alex S; Lachat, Thibault; Lantschner, Victoria; Lara, Francisco; Lasky, Jesse R; Latta, Steven C; Laurance, William F; Lavelle, Patrick; Le Féon, Violette; LeBuhn, Gretchen; Légaré, Jean-Philippe; Lehouck, Valérie; Lencinas, María V; Lentini, Pia E; Letcher, Susan G; Li, Qi; Litchwark, Simon A; Littlewood, Nick A; Liu, Yunhui; Lo-Man-Hung, Nancy; López-Quintero, Carlos A; Louhaichi, Mounir; Lövei, Gabor L; Lucas-Borja, Manuel Esteban; Luja, Victor H; Luskin, Matthew S; MacSwiney G, M Cristina; Maeto, Kaoru; Magura, Tibor; Mallari, Neil Aldrin; Malone, Louise A; Malonza, Patrick K; Malumbres-Olarte, Jagoba; Mandujano, Salvador; Måren, Inger E; Marin-Spiotta, Erika; Marsh, Charles J; Marshall, E J P; Martínez, Eliana; Martínez Pastur, Guillermo; Moreno Mateos, David; Mayfield, Margaret M; Mazimpaka, Vicente; McCarthy, Jennifer L; McCarthy, Kyle P; McFrederick, Quinn S; McNamara, Sean; Medina, Nagore G; Medina, Rafael; Mena, Jose L; Mico, Estefania; Mikusinski, Grzegorz; Milder, Jeffrey C; Miller, James R; Miranda-Esquivel, Daniel R; Moir, Melinda L; Morales, Carolina L; Muchane, Mary N; Muchane, Muchai; Mudri-Stojnic, Sonja; Munira, A Nur; Muoñz-Alonso, Antonio; Munyekenye, B F; Naidoo, Robin; Naithani, A; Nakagawa, Michiko; Nakamura, Akihiro; Nakashima, Yoshihiro; Naoe, Shoji; Nates-Parra, Guiomar; Navarrete Gutierrez, Dario A; Navarro-Iriarte, Luis; Ndang'ang'a, Paul K; Neuschulz, Eike L; Ngai, Jacqueline T; Nicolas, Violaine; Nilsson, Sven G; Noreika, Norbertas; Norfolk, Olivia; Noriega, Jorge Ari; Norton, David A; Nöske, Nicole M; Nowakowski, A Justin; Numa, Catherine; O'Dea, Niall; O'Farrell, Patrick J; Oduro, William; Oertli, Sabine; Ofori-Boateng, Caleb; Oke, Christopher Omamoke; Oostra, Vicencio; Osgathorpe, Lynne M; Otavo, Samuel Eduardo; Page, Navendu V; Paritsis, Juan; Parra-H, Alejandro; Parry, Luke; Pe'er, Guy; Pearman, Peter B; Pelegrin, Nicolás; Pélissier, Raphaël; Peres, Carlos A; Peri, Pablo L; Persson, Anna S; Petanidou, Theodora; Peters, Marcell K; Pethiyagoda, Rohan S; Phalan, Ben; Philips, T Keith; Pillsbury, Finn C; Pincheira-Ulbrich, Jimmy; Pineda, Eduardo; Pino, Joan; Pizarro-Araya, Jaime; Plumptre, A J; Poggio, Santiago L; Politi, Natalia; Pons, Pere; Poveda, Katja; Power, Eileen F; Presley, Steven J; Proença, Vânia; Quaranta, Marino; Quintero, Carolina; Rader, Romina; Ramesh, B R; Ramirez-Pinilla, Martha P; Ranganathan, Jai; Rasmussen, Claus; Redpath-Downing, Nicola A; Reid, J Leighton; Reis, Yana T; Rey Benayas, José M; Rey-Velasco, Juan Carlos; Reynolds, Chevonne; Ribeiro, Danilo Bandini; Richards, Miriam H; Richardson, Barbara A; Richardson, Michael J; Ríos, Rodrigo Macip; Robinson, Richard; Robles, Carolina A; Römbke, Jörg; Romero-Duque, Luz Piedad; Rös, Matthias; Rosselli, Loreta; Rossiter, Stephen J; Roth, Dana S; Roulston, T'ai H; Rousseau, Laurent; Rubio, André V; Ruel, Jean-Claude; Sadler, Jonathan P; Sáfián, Szabolcs; Saldaña-Vázquez, Romeo A; Sam, Katerina; Samnegård, Ulrika; Santana, Joana; Santos, Xavier; Savage, Jade; Schellhorn, Nancy A; Schilthuizen, Menno; Schmiedel, Ute; Schmitt, Christine B; Schon, Nicole L; Schüepp, Christof; Schumann, Katharina; Schweiger, Oliver; Scott, Dawn M; Scott, Kenneth A; Sedlock, Jodi L; Seefeldt, Steven S; Shahabuddin, Ghazala; Shannon, Graeme; Sheil, Douglas; Sheldon, Frederick H; Shochat, Eyal; Siebert, Stefan J; Silva, Fernando A B; Simonetti, Javier A; Slade, Eleanor M; Smith, Jo; Smith-Pardo, Allan H; Sodhi, Navjot S; Somarriba, Eduardo J; Sosa, Ramón A; Soto Quiroga, Grimaldo; St-Laurent, Martin-Hugues; Starzomski, Brian M; Stefanescu, Constanti; Steffan-Dewenter, Ingolf; Stouffer, Philip C; Stout, Jane C; Strauch, Ayron M; Struebig, Matthew J; Su, Zhimin; Suarez-Rubio, Marcela; Sugiura, Shinji; Summerville, Keith S; Sung, Yik-Hei; Sutrisno, Hari; Svenning, Jens-Christian; Teder, Tiit; Threlfall, Caragh G; Tiitsaar, Anu; Todd, Jacqui H; Tonietto, Rebecca K; Torre, Ignasi; Tóthmérész, Béla; Tscharntke, Teja; Turner, Edgar C; Tylianakis, Jason M; Uehara-Prado, Marcio; Urbina-Cardona, Nicolas; Vallan, Denis; Vanbergen, Adam J; Vasconcelos, Heraldo L; Vassilev, Kiril; Verboven, Hans A F; Verdasca, Maria João; Verdú, José R; Vergara, Carlos H; Vergara, Pablo M; Verhulst, Jort; Virgilio, Massimiliano; Vu, Lien Van; Waite, Edward M; Walker, Tony R; Wang, Hua-Feng; Wang, Yanping; Watling, James I; Weller, Britta; Wells, Konstans; Westphal, Catrin; Wiafe, Edward D; Williams, Christopher D; Willig, Michael R; Woinarski, John C Z; Wolf, Jan H D; Wolters, Volkmar; Woodcock, Ben A; Wu, Jihua; Wunderle, Joseph M; Yamaura, Yuichi; Yoshikura, Satoko; Yu, Douglas W; Zaitsev, Andrey S; Zeidler, Juliane; Zou, Fasheng; Collen, Ben; Ewers, Rob M; Mace, Georgina M; Purves, Drew W; Scharlemann, Jörn P W; Purvis, Andy

    The PREDICTS project-Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)-has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity of

  11. The Geographic Climate Information System Project (GEOCLIMA): Overview and preliminary results

    Science.gov (United States)

    Feidas, H.; Zanis, P.; Melas, D.; Vaitis, M.; Anadranistakis, E.; Symeonidis, P.; Pantelopoulos, S.

    2012-04-01

    The project GEOCLIMA aims at developing an integrated Geographic Information System (GIS) allowing the user to manage, analyze and visualize the information which is directly or indirectly related to climate and its future projections in Greece. The main components of the project are: a) collection and homogenization of climate and environmental related information, b) estimation of future climate change based on existing regional climate model (RCM) simulations as well as a supplementary high resolution (10 km x 10 km) simulation over the period 1961-2100 using RegCM3, c) compilation of an integrated uniform geographic database, and d) mapping of climate data, creation of digital thematic maps, and development of the integrated web GIS application. This paper provides an overview of the ongoing research efforts and preliminary results of the project. First, the trends in the annual and seasonal time series of precipitation and air temperature observations for all available stations in Greece are assessed. Then the set-up of the high resolution RCM simulation (10 km x 10 km) is discussed with respect to the selected convective scheme. Finally, the relationship of climatic variables with geophysical features over Greece such as altitude, location, distance from the sea, slope, aspect, distance from climatic barriers, land cover etc) is investigated, to support climate mapping. The research has been co-financed by the European Union (European Regional Development Fund) and Greek national funds through the Operational Program "Competitiveness and Entrepreneurship" of the National Strategic Reference Framework (NSRF) - Research Funding Program COOPERATION 2009.

  12. SYSTEM DYNAMICS OF MANAGEMENT OF "UNFORESEEN CIRCUMSTANCES" OF THE PROJECT

    OpenAIRE

    Богдан Владимирович ГАЙДАБРУС; Евгений Анатольевич ДРУЖИНИН

    2015-01-01

    Approaches for project contingency management through risk management and influence of stakeholders. Proposed system dynamic contingency project management model. The model describes the effects of various factors on the phase of project management through contingency.

  13. The use of intelligent systems for risk management in software projects

    Directory of Open Access Journals (Sweden)

    Oksana A. Gushchina

    2017-06-01

    Full Text Available Introduction: The article identifies the main risks of a software project, examines the use of different types of intelligent systems in the risk management process for software projects, discusses the basic methods used for process estimation and forecasting in the field of software engineering, identifies currently used empty expert systems, software systems for analysis and risk management of software projects. Materials and Methods: The author describes the peculiarities of risk management in the field of software engineering with involvement of intelligent systems. The intelligent techniques allow solving the control task with expert precision without the involvement of human experts. Results: The result of this work: – identification of the key risks of a software project (tax, legal, financial and commercial risks, IT risks, personnel risks, risks related to competitors, suppliers, marketing and demand and market; – investigation of the current, applied to risk management of software system projects, artificial intelligence, particularly expert systems and software tools for evaluation of the process results; – identification of the most popular empty expert systems (Clips, G2 and Leonardo and software products of the analysis of large databases (Orange, Weka, Rattle GUI, Apache Mahout, SCaViS, RapidMiner, Databionic ESOM Tools, ELKI, KNIME, Pandas and UIMA; – consideration of the cluster, correlation, regression, factor and dispersion analysis methods for the estimation and prediction of the processes of software engineering. Discussion and Conclusions: The results show the feasibility of the application of various intelligent systems in the risk management process. The analysis of methods of evaluating risks and the tendency of their application in the modern systems of intellectual analysis can serve as a start point for creating a unified system of risk management for software projects of medium and high complexity with a

  14. Production Systems and Supplier Selection

    DEFF Research Database (Denmark)

    Pedraza-Acosta, Isabel; Pilkington, Alan; Barnes, David

    2016-01-01

    strategic stamping suppliers. Findings: Our contribution is the multi-phased production and product innovation process. This is an advance from traditional supplier selection and also an extension of ideas of supplier-located product development as it includes production system development, and complements...

  15. Implementing Effective Mission Systems Engineering Practices During Early Project Formulation Phases

    Science.gov (United States)

    Moton, Tryshanda

    2016-01-01

    Developing and implementing a plan for a NASA space mission can be a complicated process. The needs, goals, and objectives of any proposed mission or technology must be assessed early in the Project Life Cycle. The key to successful development of a space mission or flight project is the inclusion of systems engineering in early project formulation, namely during Pre-phase A, Phase A, and Phase B of the NASA Project Life Cycle. When a space mission or new technology is in pre-development, or "pre-Formulation", feasibility must be determined based on cost, schedule, and risk. Inclusion of system engineering during project formulation is key because in addition to assessing feasibility, design concepts are developed and alternatives to design concepts are evaluated. Lack of systems engineering involvement early in the project formulation can result in increased risks later in the implementation and operations phases of the project. One proven method for effective systems engineering practice during the pre-Formulation Phase is the use of a mission conceptual design or technology development laboratory, such as the Mission Design Lab (MDL) at NASA's Goddard Space Flight Center (GSFC). This paper will review the engineering process practiced routinely in the MDL for successful mission or project development during the pre-Formulation Phase.

  16. Selective elimination of intracortically projecting neurons of the rat neocortex by prenatal x-irradiation

    International Nuclear Information System (INIS)

    Jensen, K.F.

    1981-01-01

    The development of new racing methods has suggested that there are species differences in the extent of the contribution of the different layers of the neocortex to the callosal projection. The present investigation has utilized prenatal x-irradiation to selectively eliminate the late forming neurons of the supragranular layers of the rat neocortex. The reduction in the neuronal population of the supragranular layers closely parallels the reduction in the corpus callosum. These results indicate that the primary source of neurons of the callosal projection, are the late forming neurons of the supragranular layers. Thus, the current results suggest that low dose prenatal x-irradiation may be used to evaluate important developmental events in the formation of neocortical circuitry

  17. Systems approach for design control at Monitored Retrievable Storage Project

    International Nuclear Information System (INIS)

    Kumar, P.N.; Williams, J.R.

    1994-01-01

    This paper describes the systems approach in establishing design control for the Monitored Retrievable Storage Project design development. Key elements in design control are enumerated and systems engineering aspects are detailed. Application of lessons learned from the Yucca Mountain Project experience is addressed. An integrated approach combining quality assurance and systems engineering requirements is suggested to practice effective design control

  18. Project management plan for the 105-C Reactor interim safe storage project. Revision 1

    International Nuclear Information System (INIS)

    Miller, R.L.

    1997-01-01

    In 1942, the Hanford Site was commissioned by the US Government to produce plutonium. Between 1942 and 1955, eight water-cooled, graphite-moderated reactors were constructed along the Columbia River at the Hanford Site to support the production of plutonium. The reactors were deactivated from 1964 to 1971 and declared surplus. The Surplus Production Reactor Decommissioning Project (BHI 1994b) will decommission these reactors and has selected the 105-C Reactor to be used as a demonstration project for interim safe storage at the present location and final disposition of the entire reactor core in the 200 West Area. This project will result in lower costs, accelerated schedules, reduced worker exposure, and provide direct benefit to the US Department of Energy for decommissioning projects complex wide. This project sets forth plans, organizational responsibilities, control systems, and procedures to manage the execution of the Project Management Plan for the 105-C Reactor Interim Safe Storage Project (Project Management Plan) activities to meet programmatic requirements within authorized funding and approved schedules. The Project Management Plan is organized following the guidelines provided by US Department of Energy Order 4700.1, Project Management System and the Richland Environmental Restoration Project Plan (DOE-RL 1992b)

  19. How can innovative project delivery systems improve the overall efficiency of GDOT in transportation project delivery?

    Science.gov (United States)

    2013-04-01

    The USDOT and Federal Highway Administration (FHWA) recommend the smart use of innovative project : delivery systems, such as design-build, to improve efficiency and effectiveness of developing transportation : projects. Although design-build provide...

  20. Identification and selection of cases and controls in the Pneumonia Etiology Research for Child Health project

    NARCIS (Netherlands)

    Deloria-Knoll, Maria; Feikin, Daniel R.; Scott, J. Anthony G.; O'Brien, Katherine L.; DeLuca, Andrea N.; Driscoll, Amanda J.; Levine, Orin S.; Black, Robert E.; Bhutta, Zulfiqar A.; Campbell, Harry; Cherian, Thomas; Crook, Derrick W.; de Jong, Menno D.; Dowell, Scott F.; Graham, Stephen M.; Klugman, Keith P.; Lanata, Claudio F.; Madhi, Shabir A.; Martin, Paul; Nataro, James P.; Piazza, Franco M.; Qazi, Shamim A.; Zar, Heather J.; Baggett, Henry C.; Brooks, W. Abdullah; Chipeta, James; Ebruke, Bernard; Endtz, Hubert P.; Groome, Michelle; Hammitt, Laura L.; Howie, Stephen R. C.; Kotloff, Karen; Maloney, Susan A.; Moore, David; Otieno, Juliet; Seidenberg, Phil; Tapia, Milagritos; Thamthitiwat, Somsak; Thea, Donald M.; Zaman, Khaleque

    2012-01-01

    Methods for the identification and selection of patients (cases) with severe or very severe pneumonia and controls for the Pneumonia Etiology Research for Child Health (PERCH) project were needed. Issues considered include eligibility criteria and sampling strategies, whether to enroll hospital or

  1. A Survey of Technologies Supporting Virtual Project Based Learning

    DEFF Research Database (Denmark)

    Dirckinck-Holmfeld, Lone

    2002-01-01

    This paper describes a survey of technologies and to what extent they support virtual project based learning. The paper argues that a survey of learning technologies should be related to concrete learning tasks and processes. Problem oriented project pedagogy (POPP) is discussed, and a framework...... for evaluation is proposed where negotiation of meaning, coordination and resource management are identified as the key concepts in virtual project based learning. Three e-learning systems are selected for the survey, Virtual-U, Lotus Learningspace and Lotus Quickplace, as each system offers different strategies...... for e-learning. The paper concludes that virtual project based learning may benefit from facilities of all these systems....

  2. System engineering at the MEGARA project

    Science.gov (United States)

    Pérez-Calpena, A.; García-Vargas, María. Luisa; Gil de Paz, A.; Gallego Maestro, J.; Carrasco Licea, E.; Sánchez Moreno, F.; Iglesias-Páramo, J.

    2014-08-01

    MEGARA (Multi-Espectrógrafo en GTC de Alta Resolución para Astronomía) is a facility instrument of the 10.4m GTC (La Palma, Spain) working at optical wavelengths that provides both Integral-Field Unit (IFU) and Multi- Object Spectrograph (MOS) capabilities at resolutions in the range R=6,000-20,000. The MEGARA focal plane subsystems are located at one of the GTC focal stations, while the MEGARA refractive VPH based spectrograph is located at one of the Nasmyth platforms. The fiber bundles conduct the light from the focal plane subsystems to the pseudo-slits at the entrance of the spectrograph. The project is an initiative led by Universidad Complutense de Madrid (Spain) in collaboration with INAOE (Mexico), IAA-CSIC (Spain) and Universidad Politécnica de Madrid (Spain) and is developed under contract with GRANTECAN. The project is carried out by a multidisciplinary and geographically distributed team, which includes the in-kind contributions of the project partners and personnel from several private companies. The MEGARA system-engineering plan has been tailored to the project and is being applied to ensure the technical control of the project in order to finally meet the science high-level requirements and GTC constrains.

  3. Preparation of methodology for reliability analysis of selected digital segments of the instrumentation and control systems of NPPs. Pt. 1

    International Nuclear Information System (INIS)

    Hustak, S.; Patrik, M.; Babic, P.

    2000-12-01

    The report is structured as follows: (i) Introduction; (ii) Important notions relating to the safety and dependability of software systems for nuclear power plants (selected notions from IAEA Technical Report No. 397; safety aspects of software application; reliability/dependability aspects of digital systems); (iii) Peculiarities of digital systems and ways to a dependable performance of the required function (failures in the system and principles of defence against them; ensuring resistance of digital systems against failures at various hardware and software levels); (iv) The issue of analytical procedures to assess the safety and reliability of safety-related digital systems (safety and reliability assessment at an early stage of the project; general framework of reliability analysis of complex systems; choice of an appropriate quantitative measure of software reliability); (v) Selected qualitative and quantitative information about the reliability of digital systems; the use of relations between the incidence of various types of faults); and (vi) Conclusions and recommendations. (P.A.)

  4. Multi-detector and systematic imaging system designed and developed within the New AGLAE project

    International Nuclear Information System (INIS)

    Pichon, L.; Pacheco, C.; Moignard, B.; Lemasson, Q.; Guillou, T.; Walter, Ph

    2013-01-01

    Full text: The New AGLAE project aims to establish a world-class facility for non invasive analysis of Cultural Heritage materials. One of the objectives of the New AGLAE project is to increase the x-ray measurement detection, enabling to reduce the beam intensity thus the interaction with sensitive artworks by a ten. Multidisciplinary, the New AGLAE project will provide an exceptional and multipurpose beam line with a performance in spatial resolution, beam stability and a capability of multi-particle detection much higher than for the previous facility. The New AGLAE will give fundamental elements for the understanding of the structure of materials, their composition, properties, and change over time. One of the objectives of this project is to design and set up a new data acquisition system. To reach that purpose, the surface and the number of PIXE detectors have been increased. Indeed, a 10 mm 2 and a 30 mm 3 Si(Li) detectors respectively dedicated to low and high energy measurements, were replaced by a cluster of five 50 mm 2 S.D.D. detectors. If this multi detector enables to decrease the intensity of the incident beam by one order of magnitude, involving less irradiation during the analysis, it can also provide large and/or fast maps. So as to digital the preamp pulses obtained from the detectors, a custom Digital X-ray Processor provides both digital data and control signals compatible to a multiparameter multichannel system. This multiparameter system saves each event from x-ray, gamma and particle detectors and simultaneously the X, Y positions of the beam on the sample as a list file. Furthermore, to draw several-cm-sized maps with a 20/40μm resolution, the scanning of the area originally combines a fast vertical magnetic deflection of the beam and a mechanical movement of the target. To process the data, several homemade software have been developed or updated so as to rebuild any matrix of spectra, to re-bin maps, to process a series of single spectra

  5. SYSTEM DYNAMICS OF MANAGEMENT OF "UNFORESEEN CIRCUMSTANCES" OF THE PROJECT

    Directory of Open Access Journals (Sweden)

    Богдан Владимирович ГАЙДАБРУС

    2015-05-01

    Full Text Available Approaches for project contingency management through risk management and influence of stakeholders. Proposed system dynamic contingency project management model. The model describes the effects of various factors on the phase of project management through contingency.

  6. A feeling for Systems Development Work - Design of the ROSA project

    DEFF Research Database (Denmark)

    Bødker, Susanne; Greenbaum, Joan

    1988-01-01

    This article is based on the design of a research project that will look at intuition, learning processes, language and roles in the development of computer systems. The research project, called ROSA (a Danish acronym for Roles and Cooperation in Systems Development) grew out of our interest...... in the informal working practices among systems developers, because it is these informal working relationships that are most often overlooked in research about computer science methods and tools. The project applies a gender perspective to look at the informal work relations of systems developers. The concept...

  7. Study of decision framework of wind farm project plan selection under intuitionistic fuzzy set and fuzzy measure environment

    International Nuclear Information System (INIS)

    Wu, Yunna; Geng, Shuai; Xu, Hu; Zhang, Haobo

    2014-01-01

    Highlights: • Experts’ opinions are expressed by using the intuitionistic fuzzy values. • Fuzzy measure is used to solve the dependence problem of criteria. • The compensatory problem of performance scores is reasonably processed. - Abstract: Project selection plays an important role in the entire life cycle of wind farm project and the multi-criteria decision making (MCDM) methods are very important in the whole wind farm project plan selection process. There are problems in the present MCDM methods decrease evaluation quality of the wind farm project plans: first, the information loss exists in the wind farm project plan evaluation process. Second, it is difficult to satisfy the independent assumption of the multi-criteria decision making methods used in the wind farm project plan evaluation in fact. Third, the compensatory problem of performance scores of the wind farm project plans is processed unreasonably. Hence the innovation points of this paper are as follows: first, the intuitionistic fuzzy numbers are used instead of fuzzy numbers or numerical values to reflect the experts’ intuitive preferences to decrease the probability of information loss; second, the fuzzy measure is used to rate the important degrees of criteria in order to avoid the independent assumption and to increase the reasonability; third, the partial compensatory problem of performance scores is well processed by using intuitionistic fuzzy Choquet (IFC) operator and generalized intuitionistic fuzzy ordered geometric averaging (GIFOGA) operator. These operators can deal with the compensatory performance scores and non-compensatory performance scores respectively. Finally, a case study demonstrates the effectiveness of decision framework

  8. Basic research in support of innovative fuels design for the Generation IV systems (F-BRIDGE project)

    International Nuclear Information System (INIS)

    Valot, Carole; Bertolus, Marjorie; Konings, Rudy; Somers, Joe; Groot, Sander de

    2010-01-01

    F-BRIDGE (Basic Research in support of Innovative Fuels Design for the GEN IV systems) is a 4-year project which started in 2008. It seeks to bridge the gap between basic research and technological applications for generation IV nuclear reactor systems. One of the challenges for the next generation of reactors is to significantly increase the efficiency in designing innovative fuels. The object of the F-BRIDGE project is to complement the empirical approach by a physically-based description of fuel and cladding materials to enable a rationalization of the design process and a better selection of promising fuel systems. Advanced modelling and separate effects experiments are carried out in order to obtain more exact physical descriptions of ceramic fuels and cladding, at relevant scales from the atomic to the macroscopic scale. Research is also focused on assessing and improving 'sphere-pac' fuel, a composite-ceramics concept which has shown promise. The project activities can be broken down into four main areas: (i) Basic research investigations using a multi-scale approach in both experimentation and modelling to enable the generation of missing basic data, the identification of relevant mechanisms and the development of appropriate models; (ii) Transfer between technological issues and basic research by bringing together within the same project materials scientists, engineers and end-users; (iii) Assessment of the drawbacks and benefits of the sphere-pac fuel application to various Generation IV systems; (iv) Education and training to promote research in the field of fuel materials, to ensure the exchange of results and ideas among the participants and to link the project with other related European or international initiatives. The project relies on the complementary expertise of 19 partners: nuclear and non nuclear research organisations, universities, a nuclear engineering company, as well as technology and project management consultancy small and medium

  9. Advanced Hard Real-Time Operating System, The Maruti Project. Part 1.

    Science.gov (United States)

    1997-01-01

    REAL - TIME OPERATING SYSTEM , THE MARUTI PROJECT Part 1 of 2 Ashok K. Agrawala Satish K. Tripathi Department of Computer Science University of Maryland...Hard Real - Time Operating System , The Maruti Project DASG-60-92-C-0055 5b. Program Element # 62301E 6. Author(s) 5c. Project # DRPB Ashok K. Agrawala...SdSA94), a real - time operating system developed at the I3nversity of Maryland, and conducted extensive experiments under various task

  10. Robust function projective synchronization of a class of uncertain chaotic systems

    International Nuclear Information System (INIS)

    Shen Liqun; Liu Wanyu; Ma Jianwei

    2009-01-01

    In this paper, the function projective synchronization problem of chaotic systems is investigated, where parameter mismatch exists between the drive system and the response system. Based on Lyapunov stability theory, a novel robust function projective synchronization scheme is proposed. And the parameter mismatch problem is also solved. Simulation results of Lorenz system and Chen system verify the effectiveness of the proposed control scheme.

  11. Implementing information systems with project teams using ethnographic-action research

    NARCIS (Netherlands)

    Hartmann, Timo; Fischer, Martin; Haymaker, John

    2009-01-01

    Architecture, engineering, and construction (AEC) projects are characterized by a large variation in requirements and work routines. Therefore, it is difficult to develop and implement information systems to support projects. To address these challenges, this paper presents a project-centric

  12. A program-level management system for the life cycle environmental and economic assessment of complex building projects

    International Nuclear Information System (INIS)

    Kim, Chan-Joong; Kim, Jimin; Hong, Taehoon; Koo, Choongwan; Jeong, Kwangbok; Park, Hyo Seon

    2015-01-01

    Climate change has become one of the most significant environmental issues, of which about 40% come from the building sector. In particular, complex building projects with various functions have increased, which should be managed from a program-level perspective. Therefore, this study aimed to develop a program-level management system for the life-cycle environmental and economic assessment of complex building projects. The developed system consists of three parts: (i) input part: database server and input data; (ii) analysis part: life cycle assessment and life cycle cost; and (iii) result part: microscopic analysis and macroscopic analysis. To analyze the applicability of the developed system, this study selected ‘U’ University, a complex building project consisting of research facility and residential facility. Through value engineering with experts, a total of 137 design alternatives were established. Based on these alternatives, the macroscopic analysis results were as follows: (i) at the program-level, the life-cycle environmental and economic cost in ‘U’ University were reduced by 6.22% and 2.11%, respectively; (ii) at the project-level, the life-cycle environmental and economic cost in research facility were reduced 6.01% and 1.87%, respectively; and those in residential facility, 12.01% and 3.83%, respective; and (iii) for the mechanical work at the work-type-level, the initial cost was increased 2.9%; but the operation and maintenance phase was reduced by 20.0%. As a result, the developed system can allow the facility managers to establish the operation and maintenance strategies for the environmental and economic aspects from a program-level perspective. - Highlights: • A program-level management system for complex building projects was developed. • Life-cycle environmental and economic assessment can be conducted using the system. • The design alternatives can be analyzed from the microscopic perspective. • The system can be used to

  13. A program-level management system for the life cycle environmental and economic assessment of complex building projects

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Chan-Joong [Parsons Brinckerhoff, Seoul 135-763 (Korea, Republic of); Kim, Jimin; Hong, Taehoon; Koo, Choongwan; Jeong, Kwangbok; Park, Hyo Seon [Department of Architectural Engineering, Yonsei University, Seoul 120-749 (Korea, Republic of)

    2015-09-15

    Climate change has become one of the most significant environmental issues, of which about 40% come from the building sector. In particular, complex building projects with various functions have increased, which should be managed from a program-level perspective. Therefore, this study aimed to develop a program-level management system for the life-cycle environmental and economic assessment of complex building projects. The developed system consists of three parts: (i) input part: database server and input data; (ii) analysis part: life cycle assessment and life cycle cost; and (iii) result part: microscopic analysis and macroscopic analysis. To analyze the applicability of the developed system, this study selected ‘U’ University, a complex building project consisting of research facility and residential facility. Through value engineering with experts, a total of 137 design alternatives were established. Based on these alternatives, the macroscopic analysis results were as follows: (i) at the program-level, the life-cycle environmental and economic cost in ‘U’ University were reduced by 6.22% and 2.11%, respectively; (ii) at the project-level, the life-cycle environmental and economic cost in research facility were reduced 6.01% and 1.87%, respectively; and those in residential facility, 12.01% and 3.83%, respective; and (iii) for the mechanical work at the work-type-level, the initial cost was increased 2.9%; but the operation and maintenance phase was reduced by 20.0%. As a result, the developed system can allow the facility managers to establish the operation and maintenance strategies for the environmental and economic aspects from a program-level perspective. - Highlights: • A program-level management system for complex building projects was developed. • Life-cycle environmental and economic assessment can be conducted using the system. • The design alternatives can be analyzed from the microscopic perspective. • The system can be used to

  14. Function Projective Synchronization of Two Identical New Hyperchaotic Systems

    International Nuclear Information System (INIS)

    Li Xin; Chen Yong

    2007-01-01

    A function projective synchronization of two identical hyperchaotic systems is defined and the theorem of sufficient condition is given. Based on the active control method and symbolic computation Maple, the scheme of function projective synchronization is developed to synchronize the two identical new hyperchaotic systems constructed by Yan up to a scaling function matrix with different initial values. Numerical simulations are used to verify the effectiveness of the scheme.

  15. Full state hybrid projective synchronization in hyperchaotic systems

    International Nuclear Information System (INIS)

    Chu Yandong; Chang Yingxiang; Zhang Jiangang; Li Xianfeng; An Xinlei

    2009-01-01

    In this letter, we investigate the full state hybrid projective synchronization (FSHPS) which includes complete synchronization, anti-synchronization and projective synchronization as its special items. Based on Lyapunov stability theory a controller can be designed for achieving the FSHPS of hyperchaotic systems. Numerical simulations are provided to verify the effectiveness of the proposed scheme.

  16. Selection and implementation of a laboratory computer system.

    Science.gov (United States)

    Moritz, V A; McMaster, R; Dillon, T; Mayall, B

    1995-07-01

    The process of selection of a pathology computer system has become increasingly complex as there are an increasing number of facilities that must be provided and stringent performance requirements under heavy computing loads from both human users and machine inputs. Furthermore, the continuing advances in software and hardware technology provide more options and innovative new ways of tackling problems. These factors taken together pose a difficult and complex set of decisions and choices for the system analyst and designer. The selection process followed by the Microbiology Department at Heidelberg Repatriation Hospital included examination of existing systems, development of a functional specification followed by a formal tender process. The successful tenderer was then selected using predefined evaluation criteria. The successful tenderer was a software development company that developed and supplied a system based on a distributed network using a SUN computer as the main processor. The software was written using Informix running on the UNIX operating system. This represents one of the first microbiology systems developed using a commercial relational database and fourth generation language. The advantages of this approach are discussed.

  17. Dryden Flight Research Center Critical Chain Project Management Implementation

    Science.gov (United States)

    Hines, Dennis O.

    2012-01-01

    In Fiscal Year 2011 Dryden Flight Research Center (DFRC) implemented a new project management system called Critical Chain Project Management (CCPM). Recent NASA audits have found that the Dryden workforce is strained under increasing project demand and that multi-tasking has been carried to a whole new level at Dryden. It is very common to have an individual work on 10 different projects during a single pay period. Employee surveys taken at Dryden have identified work/life balance as the number one issue concerning employees. Further feedback from the employees indicated that project planning is the area needing the most improvement. In addition, employees have been encouraged to become more innovative, improve job skills, and seek ways to improve overall job efficiency. In order to deal with these challenges, DFRC management decided to adopt the CCPM system that is specifically designed to operate in a resource constrained multi-project environment. This paper will discuss in detail the rationale behind the selection of CCPM and the goals that will be achieved through this implementation. The paper will show how DFRC is tailoring the CCPM system to the flight research environment as well as laying out the implementation strategy. Results of the ongoing implementation will be discussed as well as change management challenges and organizational cultural changes. Finally this paper will present some recommendations on how this system could be used by selected NASA projects or centers.

  18. Utilizing a scale model solar system project to visualize important planetary science concepts and develop technology and spatial reasoning skills

    Science.gov (United States)

    Kortenkamp, Stephen J.; Brock, Laci

    2016-10-01

    Scale model solar systems have been used for centuries to help educate young students and the public about the vastness of space and the relative sizes of objects. We have adapted the classic scale model solar system activity into a student-driven project for an undergraduate general education astronomy course at the University of Arizona. Students are challenged to construct and use their three dimensional models to demonstrate an understanding of numerous concepts in planetary science, including: 1) planetary obliquities, eccentricities, inclinations; 2) phases and eclipses; 3) planetary transits; 4) asteroid sizes, numbers, and distributions; 5) giant planet satellite and ring systems; 6) the Pluto system and Kuiper belt; 7) the extent of space travel by humans and robotic spacecraft; 8) the diversity of extrasolar planetary systems. Secondary objectives of the project allow students to develop better spatial reasoning skills and gain familiarity with technology such as Excel formulas, smart-phone photography, and audio/video editing.During our presentation we will distribute a formal description of the project and discuss our expectations of the students as well as present selected highlights from preliminary submissions.

  19. The Optimization of the Time-Cost Tradeoff Problem in Projects with Conditional Activities Using of the Multi-Objective Charged System Search Algorithm (SMOCSS

    Directory of Open Access Journals (Sweden)

    M. K. Sharbatdar

    2016-11-01

    Full Text Available Abstract The appropriate planning and scheduling for reaching the project goals in the most economical way is the very basic issue of the project management. As in each project, the project manager must determine the required activities for the implementation of the project and select the best option in the implementation of each of the activities, in a way that the least final cost and time of the project is achieved. Considering the number of activities and selecting options for each of the activities, usually the selection has not one unique solution, but it consists of a set of solutions that are not preferred to each other and are known as Pareto solutions. On the other hand, in some actual projects, there are activities that their implementation options depend on the implementation of the prerequisite activity and are not applicable using all the implementation options, and even in some cases the implementation or the non-implementation of some activities are also dependent on the prerequisite activity implementation. These projects can be introduced as conditional projects. Much researchs have been conducted for acquiring Pareto solution set, using different methods and algorithms, but in all the done tasks the time-cost optimization of conditional projects is not considered. Thus, in the present study the concept of conditional network is defined along with some practical examples, then an appropriate way to illustrate these networks and suitable time-cost formulation of these are presented. Finally, for some instances of conditional activity networks, conditional project time-cost optimization conducted multi-objectively using known meta-heuristic algorithms such as multi-objective genetic algorithm, multi-objective particle swarm algorithm and multi-objective charged system search algorithm.

  20. RIMAP demonstration project. Risk-based life management of piping system in power plant Heilbronn

    International Nuclear Information System (INIS)

    Bareiss, J.; Buck, P.; Matschecko, B.; Jovanovic, A.; Balos, D.; Perunicic, M.

    2004-01-01

    In the framework of EU project RIMAP [Risk Based Inspection and Maintenance Procedures for European Industry (2000)] a new European Guideline for optimized risk based maintenance and inspection planning of industrial plants (RBLM, Risk Based Life Management) is being developed. The RIMAP project consists of the three clustered projects: - development (RTD); - demonstration (DEMO): - thematic network (TN). Current work and future, planned work in RIMAP demonstration project on applications of the RIMAP methodology in power plants are presented briefly in the first part of the paper. Also presented in the paper are the results of a preliminary analysis of piping system in power plant Heilbronn using the concept of risk-based monitoring as part of overall concept of risk-based life management. Shortly the following issues are discussed in the paper: - identification of critical components; - application of a multilevel risk analysis (...from 'screening' to 'detailed analysis'); - determination of PoF (Probability of Failure); - determination of CoF (Consequence of Failure); - optimation of inspection and maintenance plan. From our experience with the application of the RIMAP methodology the following conclusions can be drawn: The use of risk-based methods in inspection and maintenance of piping systems in power plants gives transparency to the decision making process and gives an optimized maintenance policy based on current state of the components. The results of the work clearly show the power of the proposed method for concentration on critical items: out of 64 monitored components 5 were selected for intermediate analysis and only 1 for the detailed analysis (probabilistic high temperature fracture mechanics)

  1. Systems engineering management plan for the Salt Repository Project

    International Nuclear Information System (INIS)

    Neff, J.O.

    1986-08-01

    This document presents the plan for using systems engineering in conducting and managing the technical work of the Salt Repository Project (SRP) of the US Department of Energy's Civilian Radioactive Waste Management Program. The need for preparing a Systems Engineering Management Plan (SEMP) is traced back to relevant DOE directives. These directives are interpreted as SRP requirements in the context of the Mined Geologic Disposal System. The strategy for conducting systems engineering on the SRP, including the role of the systems engineering process, is then described. The SEMP also designates who in the project organization will be responsible for carrying out the activities. Finally, the management tools that are used to implement the systems engineering process, including associated documentation on the SRP, are described

  2. Privacy impact assessment in the design of transnational public health information systems: the BIRO project.

    Science.gov (United States)

    Di Iorio, C T; Carinci, F; Azzopardi, J; Baglioni, V; Beck, P; Cunningham, S; Evripidou, A; Leese, G; Loevaas, K F; Olympios, G; Federici, M Orsini; Pruna, S; Palladino, P; Skeie, S; Taverner, P; Traynor, V; Benedetti, M Massi

    2009-12-01

    To foster the development of a privacy-protective, sustainable cross-border information system in the framework of a European public health project. A targeted privacy impact assessment was implemented to identify the best architecture for a European information system for diabetes directly tapping into clinical registries. Four steps were used to provide input to software designers and developers: a structured literature search, analysis of data flow scenarios or options, creation of an ad hoc questionnaire and conduction of a Delphi procedure. The literature search identified a core set of relevant papers on privacy (n = 11). Technicians envisaged three candidate system architectures, with associated data flows, to source an information flow questionnaire that was submitted to the Delphi panel for the selection of the best architecture. A detailed scheme envisaging an "aggregation by group of patients" was finally chosen, based upon the exchange of finely tuned summary tables. Public health information systems should be carefully engineered only after a clear strategy for privacy protection has been planned, to avoid breaching current regulations and future concerns and to optimise the development of statistical routines. The BIRO (Best Information Through Regional Outcomes) project delivers a specific method of privacy impact assessment that can be conveniently used in similar situations across Europe.

  3. The UK Earth System Model project

    Science.gov (United States)

    Tang, Yongming

    2016-04-01

    In this talk we will describe the development and current status of the UK Earth System Model (UKESM). This project is a NERC/Met Office collaboration and has two objectives; to develop and apply a world-leading Earth System Model, and to grow a community of UK Earth System Model scientists. We are building numerical models that include all the key components of the global climate system, and contain the important process interactions between global biogeochemistry, atmospheric chemistry and the physical climate system. UKESM will be used to make key CMIP6 simulations as well as long-time (e.g. millennium) simulations, large ensemble experiments and investigating a range of future carbon emission scenarios.

  4. Chemically Functionalized Arrays Comprising Micro and Nano-Etro-Mechanizal Systems for Reliable and Selective Characterization of Tank Waste

    International Nuclear Information System (INIS)

    Sepaniak, Michael J.

    2008-01-01

    Innovative technology of sensory and selective chemical monitoring of hazardous wastes present in storage tanks are of continued importance to the environment. This multifaceted research program exploits the unique characteristics of micro and nano-fabricated cantilever-based, micro-electro-mechanical systems (MEMES) and nano-electro-mechanical systems (NEMS) in chemical sensing. Significant progress was made in tasks that were listed in the work plan for DOE EMSP project 'Hybrid Micro-Electro-Mechanical Systems for Highly Reliable and Selective Characterization of Tank Waste'. These tasks are listed below in modified form followed by the report on progress. (1) Deposit chemically selective phases on model MEMS devices with nanostructured surface layers to identify optimal technological approaches. (2) Monitor mechanical (deflection) and optical (SERS) responses of the created MEMS to organic and inorganic species in aqueous environments. (3) Explore and compare different approaches to immobilization of selective phases on the thermal detectors. (4) Demonstrate improvements in selectivity and sensitivity to model pollutants due to implemented technologies of nanostructuring and multi-mode read-out. (5) Demonstrate detection of different analytes on a single hybrid MEMS (6) Implement the use of differential pairs of cantilever sensors (coated and reference) with the associated detector electronics which is expected to have an enhanced sensitivity with a low-noise low-drift response. (7) Development of methods to create differential arrays and test effectiveness at creating distinctive differential responses.

  5. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  6. A Hybrid MCDM Approach for Strategic Project Portfolio Selection of Agro By-Products

    Directory of Open Access Journals (Sweden)

    Animesh Debnath

    2017-07-01

    Full Text Available Due to the increasing size of the population, society faces several challenges for sustainable and adequate agricultural production, quality, distribution, and food safety in the strategic project portfolio selection (SPPS. The initial adaptation of strategic portfolio management of genetically modified (GM Agro by-products (Ab-Ps is a huge challenge in terms of processing the agro food product supply-chain practices in an environmentally nonthreatening way. As a solution to the challenges, the socio-economic characteristics for SPPS of GM food purchasing scenarios are studied. Evaluation and selection of the GM agro portfolio management are the dynamic issues due to physical and immaterial criteria involving a hybrid multiple criteria decision making (MCDM approach, combining modified grey Decision-Making Trial and Evaluation Laboratory (DEMATEL, Multi-Attributive Border Approximation area Comparison (MABAC and sensitivity analysis. Evaluation criteria are grouped into social, differential and beneficial clusters, and the modified DEMATEL procedure is used to derive the criteria weights. The MABAC method is applied to rank the strategic project portfolios according to the aggregated preferences of decision makers (DMs. The usefulness of the proposed research framework is validated with a case study. The GM by-products are found to be the best portfolio. Moreover, this framework can unify the policies of agro technological improvement, corporate social responsibility (CSR and agro export promotion.

  7. A Fast Adaptive Receive Antenna Selection Method in MIMO System

    Directory of Open Access Journals (Sweden)

    Chaowei Wang

    2013-01-01

    Full Text Available Antenna selection has been regarded as an effective method to acquire the diversity benefits of multiple antennas while potentially reduce hardware costs. This paper focuses on receive antenna selection. According to the proportion between the numbers of total receive antennas and selected antennas and the influence of each antenna on system capacity, we propose a fast adaptive antenna selection algorithm for wireless multiple-input multiple-output (MIMO systems. Mathematical analysis and numerical results show that our algorithm significantly reduces the computational complexity and memory requirement and achieves considerable system capacity gain compared with the optimal selection technique in the same time.

  8. NASA UAS Integration into the NAS Project: Human Systems Integration

    Science.gov (United States)

    Shively, Jay

    2016-01-01

    This presentation provides an overview of the work the Human Systems Integration (HSI) sub-project has done on detect and avoid (DAA) displays while working on the UAS (Unmanned Aircraft System) Integration into the NAS project. The most recent simulation on DAA interoperability with Traffic Collision Avoidance System (TCAS) is discussed in the most detail. The relationship of the work to the larger UAS community and next steps are also detailed.

  9. Major Components of the National TRU Waste System Optimization Project

    International Nuclear Information System (INIS)

    Moody, D.C.; Bennington, B.; Sharif, F.

    2002-01-01

    The National Transuranic (TRU) Program (NTP) is being optimized to allow for disposing of the legacy TRU waste at least 10 years earlier than originally planned. This acceleration will save the nation an estimated $713. The Department of Energy's (DOE'S) Carlsbad Field Office (CBFO) has initiated the National TRU Waste System Optimization Project to propose, and upon approvaI, implement activities that produce significant cost saving by improving efficiency, thereby accelerating the rate of TRU waste disposal without compromising safety. In its role as NTP agent of change, the National TRU Waste System Optimization Project (the Project) (1) interacts closely with all NTP activities. Three of the major components of the Project are the Central Characterization Project (CCP), the Central Confirmation Facility (CCF), and the MobiIe/Modular Deployment Program.

  10. RF Phase Reference Distribution System for the TESLA Technology Based Projects

    CERN Document Server

    Czuba, K; Romaniuk, R S

    2013-01-01

    Since many decades physicists have been building particle accelerators and usually new projects became more advanced, more complicated and larger than predecessors. The importance and complexity of the phase reference distribution systems used in these accelerators have grown significantly during recent years. Amongst the most advanced of currently developed accelerators are projects based on the TESLA technology. These projects require synchronization of many RF devices with accuracy reaching femtosecond levels over kilometre distances. Design of a phase reference distribution system fulfilling such requirements is a challenging scientific task. There are many interdisciplinary problems which must be solved during the system design. Many, usually negligible issues, may became very important in such system. Furthermore, the design of a distribution system on a scale required for the TESLA technology based projects is a new challenge and there is almost no literature sufficiently covering this subject. This th...

  11. Selective evolutionary generation systems: Theory and applications

    Science.gov (United States)

    Menezes, Amor A.

    This dissertation is devoted to the problem of behavior design, which is a generalization of the standard global optimization problem: instead of generating the optimizer, the generalization produces, on the space of candidate optimizers, a probability density function referred to as the behavior. The generalization depends on a parameter, the level of selectivity, such that as this parameter tends to infinity, the behavior becomes a delta function at the location of the global optimizer. The motivation for this generalization is that traditional off-line global optimization is non-resilient and non-opportunistic. That is, traditional global optimization is unresponsive to perturbations of the objective function. On-line optimization methods that are more resilient and opportunistic than their off-line counterparts typically consist of the computationally expensive sequential repetition of off-line techniques. A novel approach to inexpensive resilience and opportunism is to utilize the theory of Selective Evolutionary Generation Systems (SECS), which sequentially and probabilistically selects a candidate optimizer based on the ratio of the fitness values of two candidates and the level of selectivity. Using time-homogeneous, irreducible, ergodic Markov chains to model a sequence of local, and hence inexpensive, dynamic transitions, this dissertation proves that such transitions result in behavior that is called rational; such behavior is desirable because it can lead to both efficient search for an optimizer as well as resilient and opportunistic behavior. The dissertation also identifies system-theoretic properties of the proposed scheme, including equilibria, their stability and their optimality. Moreover, this dissertation demonstrates that the canonical genetic algorithm with fitness proportional selection and the (1+1) evolutionary strategy are particular cases of the scheme. Applications in three areas illustrate the versatility of the SECS theory: flight

  12. OPAL: selection and acquisition of LEP data

    International Nuclear Information System (INIS)

    Le Du, P.

    1985-01-01

    The OPAL project (Omni Purpose aparatus for LEP) is presented. It will be a frame and an example to explain the main problems and limitations concerning the mode of event selection, acquisition and information transfer to the final registering system. A quick review of the different problems related to data selection and acquisition is made [fr

  13. Sources of project financing in health care systems.

    Science.gov (United States)

    Smith, D G; Wheeler, J R; Rivenson, H L; Reiter, K L

    2000-01-01

    Through discussions with chief financial officers of leading health care systems, insights are offered on preferences for project financing and development efforts. Data from these same systems provide at least anecdotal evidence in support of pecking-order theory.

  14. Evaluation and selection of CASE tool for SMART OTS development

    International Nuclear Information System (INIS)

    Park, K. O; Seo, S. M.; Seo, Y. S.; Koo, I. S.; Jang, M. H.

    1999-01-01

    CASE(Computer-Aided Software Engineering) tool is a software that aids in software engineering activities such as requirement analysis, design, testing, configuration management, and project management. The evaluation and selection of commercial CASE tools for the specific software development project is not a easy work because the technical ability of an evaluator and the maturity of a software development organization are required. In this paper, we discuss selection strategies, characteristic survey, evaluation criteria, and the result of CASE tool selection for the development of SMART(System-integrated Modular Advanced ReacTor) OTS(Operator Training Simulator)

  15. Building an internet-based workflow system - the case of Lawrence Livermore National Laboratories` Zephyr project

    Energy Technology Data Exchange (ETDEWEB)

    Jordan, C. W., LLNL

    1998-04-01

    Lawrence Livermore National Laboratories` Zephyr System provides a showcase for the ways in which emerging technologies can help streamline procurement processes and improve the coordination between participants in engineering projects by allowing collaboration in ways that have not been possible before. The project also shows the success of a highly pragmatic approach that was initiated by the end user community, and that intentionally covered standard situations, rather than aiming at also automating the exceptions. By helping push purchasing responsibilities down to the end user, thereby greatly reducing the involvement of the purchasing department in operational activities, it was possible to streamline the process significantly resulting in time savings of up to 90%, major cost reductions, and improved quality. Left with less day-to- day purchasing operations, the purchasing department has more time for strategic tasks such as selecting and pre-qualifying new suppliers, negotiating blanket orders, or implementing new procurement systems. The case shows once more that the use of information technologies can result in major benefits when aligned with organizational adjustments.

  16. A Fuzzy-MOORA approach for ERP system selection

    Directory of Open Access Journals (Sweden)

    Prasad Karande

    2012-07-01

    Full Text Available In today’s global and dynamic business environment, manufacturing organizations face the tremendous challenge of expanding markets and meeting the customer expectations. It compels them to lower total cost in the entire supply chain, shorten throughput time, reduce inventory, expand product choice, provide more reliable delivery dates and better customer service, improve quality, and efficiently coordinate demand, supply and production. In order to accomplish these objectives, the manufacturing organizations are turning to enterprise resource planning (ERP system, which is an enterprise-wide information system to interlace all the necessary business functions, such as product planning, purchasing, inventory control, sales, financial and human resources into a single system having a shared database. Thus to survive in the global competitive environment, implementation of a suitable ERP system is mandatory. However, selecting a wrong ERP system may adversely affect the manufacturing organization’s overall performance. Due to limitations in available resources, complexity of ERP systems and diversity of alternatives, it is often difficult for a manufacturing organization to select and install the most suitable ERP system. In this paper, two ERP system selection problems are solved using fuzzy multi-objective optimization on the basis of ratio analysis (MOORA method and it is observed that in both the cases, SAP is the best solution.

  17. Development of a website and an information system for an European R&D project : the example of the STRATFEED project

    Directory of Open Access Journals (Sweden)

    Baeten V.

    2003-01-01

    Full Text Available The multidisciplinary nature, the international partnership and the large amount of information to be managed in an European project such as STRATFEED, require the development of an information management system. Within the framework of this project, the development of the Internet-oriented computer system required three facets: the data and information collection, the database building and the development of different applications. A tool for the dissemination of results (STRATFEED website with both a public part and a confidential part, a tool for data management (STRATFEED manager, a tool for data queries (STRATFEED explorer and two tools for decision-making (ARIES Decision Support System –– CD-Rom release and STRATFEED Decision Support System – Internet release were developed. The modular concept, which relates to the different topics of the project, facilitates the updating and development of a system according to research progress and user needs. The concept developed for this project can be used for any other project and can easily be adapted to meet new requirements. The example of the STRATFEED project can be accessed at: http://stratfeed.cra.wallonie.be

  18. Overview of NASA Finesse (Field Investigations to Enable Solar System Science and Exploration) Science and Exploration Project

    Science.gov (United States)

    Heldmann, J. L.; Lim, D.S.S.; Hughes, S.; Nawotniak, S. Kobs; Garry, B.; Sears, D.; Neish, C.; Osinski, G. R.; Hodges, K.; Downs, M.; hide

    2016-01-01

    NASA's FINESSE (Field Investigations to Enable Solar System Science and Exploration) project was selected as a research team by NASA's Solar System Exploration Research Virtual Institute (SSERVI). SSERVI is a joint Institute supported by NASA's Science Mission Directorate (SMD) and Human Exploration and Operations Mission Directorate (HEOMD). As such, FINESSE is focused on a science and exploration field-based research program to generate strategic knowledge in preparation for human and robotic exploration of other planetary bodies including our Moon, Mars moons Phobos and Deimos, and near-Earth asteroids. FINESSE embodies the philosophy that "science enables exploration and exploration enables science".

  19. Generalized projective synchronization of a unified chaotic system

    International Nuclear Information System (INIS)

    Yan Jianping; Li Changpin

    2005-01-01

    In the present paper, a simple but efficient control technique of the generalized projective synchronization is applied to a unified chaotic system. Numerical simulations show that this method works very well, which can also be applied to other chaotic systems

  20. Selective tungsten deposition in a batch cold wall CVD system

    International Nuclear Information System (INIS)

    Chow, R.; Kang, S.; Harshbarger, W.R.; Susoeff, M.

    1987-01-01

    Selective deposition of tungsten offers many advantages for VLSI technology. The process can be used as a planarization technique for multilevel interconnect technology, it can be used to fill contacts and to provide a barrier layer between Al and Si materials, and the selective W process might be used as a self-aligned technology to provide low resistance layers on source/drain and gate conductors. Recent publications have indicate that cold wall CVD systems provide advantages for development of selective W process. Genus has investigated selective W deposition processing, and we have developed a selective W deposition process for the Genus 8402 multifilm deposition system. This paper describes the Genus 8402 system and the selective W process developed in this reactor. To further develop selective W technology, Genus has signed an agreement with General Electric establishing a joint development program. As a part of this program, the authors characterized the selective W process for encroachment, Si consumption and degrees of selectivity on various dielectrics. The status of this development activity and process characterization is reviewed in this paper

  1. Liquidus Projection and Thermodynamic Modeling of a Sn-Ag-Zn System

    Science.gov (United States)

    Chen, Sinn-wen; Chiu, Wan-ting; Gierlotka, Wojciech; Chang, Jui-shen; Wang, Chao-hong

    2017-12-01

    Sn-Ag-Zn alloys are promising Pb-free solders. In this study, the Sn-Ag-Zn liquidus projection was determined, and the Sn-Ag-Zn thermodynamic modeling was developed. Various Sn-Ag-Zn alloys were prepared. Their as-cast microstructures and primary solidification phases were examined. The invariant reaction temperatures of the ternary Sn-Ag-Zn system were determined. The liquidus projection of the Sn-Ag-Zn ternary system was constructed. It was found that the Sn-Ag-Zn ternary system has eight primary solidification phases: ɛ2-AgZn3, γ-Ag5Zn8, β-AgZn, ζ-Ag4Sn, (Ag), ɛ1-Ag3Sn, β-(Sn) and (Zn) phases. There are eight ternary invariant reactions, and the liquid + (Ag) = β-AgZn + ζ-Ag4Sn reaction is of the highest temperature at 935.5 K. Thermodynamic modeling of the ternary Sn-Ag-Zn system was also carried out in this study based on the thermodynamic models of the three constituent binary systems and the experimentally determined liquidus projection. The liquidus projection and the isothermal sections are calculated. The calculated and experimentally determined liquidus projections are in good agreement.

  2. XUV free-electron laser-based projection lithography systems

    Energy Technology Data Exchange (ETDEWEB)

    Newnam, B.E.

    1990-01-01

    Free-electron laser sources, driven by rf-linear accelerators, have the potential to operate in the extreme ultraviolet (XUV) spectral range with more than sufficient average power for high-volume projection lithography. For XUV wavelengths from 100 nm to 4 nm, such sources will enable the resolution limit of optical projection lithography to be extended from 0.25 {mu}m to 0.05{mu}m and with an adequate total depth of focus (1 to 2 {mu}m). Recent developments of a photoinjector of very bright electron beams, high-precision magnetic undulators, and ring-resonator cavities raise our confidence that FEL operation below 100 nm is ready for prototype demonstration. We address the motivation for an XUV FEL source for commercial microcircuit production and its integration into a lithographic system, include reflecting reduction masks, reflecting XUV projection optics and alignment systems, and surface-imaging photoresists. 52 refs., 7 figs.

  3. The controlled ecological life support system Antarctic analog project: Analysis of wastewater from the South Pole Station, Antarctica, volume 1

    Science.gov (United States)

    Flynn, Michael T.; Bubenheim, David L.; Straight, Christian L.; Belisle, Warren

    1994-01-01

    The Controlled Ecological Life Support system (CELSS) Antarctic Analog Project (CAAP) is a joint National Science Foundation (NSF) and NASA project for the development, deployment and operation of CELSS technologies at the Amundsen-Scott South Pole Station. NASA goals are operational testing of CELSS technologies and the conduct of scientific studies to facilitate technology selection and system design. The NSF goals are that the food production, water purification, and waste treatment capabilities which will be provided by CAAP will improve the quality of life for the South Pole inhabitants, reduce logistics dependence, and minimize environmental impacts associated with human presence on the polar plateau. This report presents an analysis of wastewater samples taken from the Amundsen-Scott South Pole Station, Antarctica. The purpose of the work is to develop a quantitative understanding of the characteristics of domestic sewage streams at the South Pole Station. This information will contribute to the design of a proposed plant growth/waste treatment system which is part of the CELSS Antarctic Analog Project (CAAP).

  4. Digital detection systems for projection radiography

    International Nuclear Information System (INIS)

    Schulz, R.F.

    2001-01-01

    This article gives a survey of digital X-ray detection systems for projection radiography. The different principles are compared and some general characteristics are derived. The basic conversion mechanisms in the absorption layers are described. The basic principles of solid state X-ray detectors and their general characteristics are elucidated as well as some similarities with detectors for computed tomography. Some important application and system aspects are considered. An outlook on further possible developments in this field is given. (orig.) [de

  5. Setup and organisation of a NDA-system procurement project

    International Nuclear Information System (INIS)

    Botte, John; Gielen, Paul

    2007-01-01

    Belgoprocess is momentarily in the process of purchasing its fifth NDA-system. Measurement systems are, although based on general designs, not from the shelf items but tailor-made sophisticated and highly automated devices. It is obvious that such a project cannot be carried out by solely a NDA team, but needs a multifunctional team. This team combines NDA expertise with experts in civil works, electrical and mechanical engineering, procurement, IT, safety and legal administration. From less positive experiences in the past, Belgoprocess learned a lot and has now a systematic in place. This systematic structures the project from definition of requirements to operation, a two to three year process. This paper defines the phases of a NDA project and gives for each phase some do's and don'ts. A second subject is the writing and handling of the vast but needed and required documentation. It gives a brief overview of the over thirty documents and files needed. The described, integrated and formal approach reduces the risk of failing projects, systems not meeting the expectations or denied qualification. It puts clear agreements in place, smoothening the relationship between company, supplier and authorities. (authors)

  6. A New 4D Hyperchaotic System and Its Generalized Function Projective Synchronization

    Directory of Open Access Journals (Sweden)

    Yuan Gao

    2013-01-01

    Full Text Available A new four-dimensional hyperchaotic system is investigated. Numerical and analytical studies are carried out on its basic dynamical properties, such as equilibrium point, Lyapunov exponents, Poincaré maps, and chaotic dynamical behaviors. We verify the realizability of the new system via an electronic circuit by using Multisim software. Furthermore, a generalized function projective synchronization scheme of two different hyperchaotic systems with uncertain parameters is proposed, which includes some existing projective synchronization schemes, such as generalized projection synchronization and function projective synchronization. Based on the Lyapunov stability theory, a controller with parameters update laws is designed to realize synchronization. Using this controller, we realize the synchronization between Chen hyperchaotic system and the new system to verify the validity and feasibility of our method.

  7. The Environmental Data Exchange Network for Inland Water (EDEN-IW) project

    DEFF Research Database (Denmark)

    Wuertz, J.; Haastrup, P.; Stjernholm, M.

    The report summarizes the outcome of the EDEN -IW project. The project demonstrates access to heterogenous databases of inland water quality data using a system of software agents. The system include use of semantic web technologies to provide the use with a rich multilingual web interface...... to select, access, aggregate and visualize inland water data....

  8. GCD TechPort Data Sheets Thermal Protection System Materials (TPSM) Project

    Science.gov (United States)

    Chinnapongse, Ronald L.

    2014-01-01

    The Thermal Protection System Materials (TPSM) Project consists of three distinct project elements: the 3-Dimensional Multifunctional Ablative Thermal Protection System (3D MAT) project element; the Conformal Ablative Thermal Protection System (CA-TPS) project element; and the Heatshield for Extreme Entry Environment Technology (HEEET) project element. 3D MAT seeks to design, develop and deliver a game changing material solution based on 3-dimensional weaving and resin infusion approach for manufacturing a material that can function as a robust structure as well as a thermal protection system. CA-TPS seeks to develop and deliver a conformal ablative material designed to be efficient and capable of withstanding peak heat flux up to 500 W/ sq cm, peak pressure up to 0.4 atm, and shear up to 500 Pa. HEEET is developing a new ablative TPS that takes advantage of state-of-the-art 3D weaving technologies and traditional manufacturing processes to infuse woven preforms with a resin, machine them to shape, and assemble them as a tiled solution on the entry vehicle substructure or heatshield.

  9. Goal Selection for Embedded Systems with Oversubscribed Resources

    Science.gov (United States)

    Rabideau, Gregg; Chien, Steve; McLaren, David

    2010-01-01

    We describe an efficient, online goal selection algorithm and its use for selecting goals at runtime. Our focus is on the re-planning that must be performed in a timely manner on the embedded system where computational resources are limited. In particular, our algorithm generates near optimal solutions to problems with fully specified goal requests that oversubscribe available resources but have no temporal flexibility. By using a fast, incremental algorithm, goal selection can be postponed in a "just-in-time" fashion allowing requests to be changed or added at the last minute. This enables shorter response cycles and greater autonomy for the system under control.

  10. A Role for Soft Systems Methodology in ELT Projects.

    Science.gov (United States)

    Holliday, Adrian

    1990-01-01

    Discusses the uses for soft systems methodology (SSM) in English language training (ELT) projects. It is suggested that ethnographic techniques may help in achieving the understanding needed to start an ELT project while SSM may provide a useful means for structuring ethnographic findings. (Author/VWL)

  11. Tank waste remediation system characterization project quality policies

    International Nuclear Information System (INIS)

    Board, D.C.

    1997-01-01

    This quality plan describes the system used by Characterization Project management to achieve quality. This plan is comprised of eleven quality policies which, when taken together, form a management system deployed to achieve quality. This quality management system is based on the customer's quality requirements known as the 'RULE', 10 CFR 830.120, Quality Assurance

  12. Development of decision support system for employee selection using Adaptive Neuro Fuzzy Inference System

    Directory of Open Access Journals (Sweden)

    ‘Azzam Abdullah

    2018-01-01

    Full Text Available The number of children day care is increasing from year to year. Children day care is categorized as service industry that help parents in caring and educate children. This type of service industry plays a substitute for the family at certain hours, usually during work hours. The common problems in this industry is related to the employee performance. Most of employees have a less understanding about the whole job. Some employees only perform a routine task, i.e. feeding, cleaning and putting the child to sleep. The role in educating children is not performed as well as possible. Therefore, the employee selection is an important process to solve a children day care problem. An effective decision support system is required to optimize the employee selection process. Adaptive neuro fuzzy inference system (ANFIS is used to develop the decision support system for employee selection process. The data used to build the system is the historical data of employee selection process in children day care. The data shows the characteristic of job applicant that qualified and not qualified. From that data, the system can perform a learning process and give the right decision. The system is able to provide the right decision with an error of 0,00016249. It means that the decision support system that developed using ANFIS can give the right recommendation for employee selection process.

  13. MSFC Propulsion Systems Department Knowledge Management Project

    Science.gov (United States)

    Caraccioli, Paul A.

    2007-01-01

    This slide presentation reviews the Knowledge Management (KM) project of the Propulsion Systems Department at Marshall Space Flight Center. KM is needed to support knowledge capture, preservation and to support an information sharing culture. The presentation includes the strategic plan for the KM initiative, the system requirements, the technology description, the User Interface and custom features, and a search demonstration.

  14. Evaluation of Embedded System Component Utilized in Delivery Integrated Design Project Course

    Science.gov (United States)

    Junid, Syed Abdul Mutalib Al; Hussaini, Yusnira; Nazmie Osman, Fairul; Razak, Abdul Hadi Abdul; Idros, Mohd Faizul Md; Karimi Halim, Abdul

    2018-03-01

    This paper reports the evaluation of the embedded system component utilized in delivering the integrated electronic engineering design project course. The evaluation is conducted based on the report project submitted as to fulfil the assessment criteria for the integrated electronic engineering design project course named; engineering system design. Six projects were assessed in this evaluation. The evaluation covers the type of controller, programming language and the number of embedded component utilization as well. From the evaluation, the C-programming based language is the best solution preferred by the students which provide them flexibility in the programming. Moreover, the Analog to Digital converter is intensively used in the projects which include sensors in their proposed design. As a conclusion, in delivering the integrated design project course, the knowledge over the embedded system solution is very important since the high density of the knowledge acquired in accomplishing the project assigned.

  15. THE MODEL OF EXPERT SYSTEM FOR SCIENTIFIC PROJECTS EVALUATION IN HIGHER EDUCATIONAL INSTITUTIONS

    Directory of Open Access Journals (Sweden)

    Олександр Михайлович ВОЗНИЙ

    2015-05-01

    Full Text Available There have been proposed the model of the expert system for the assessment of research projects in higher educational institutions, based on estimates of probability. It allows to rank alternative projects and scenarios. The model is implemented through the software "Small expert system." The principle of calculating the probability of approval of research projects, which form the basis of the expert system, is based on Bayes' theorem. Expert system calculates the probability of approval of research projects by Ministry of Science and Education on the basis of the responses to questions about the content of the request for the execution of research projects. Questions are formed on the basis of the criteria by which experts of state authorities evaluate scientific research projects.

  16. About Nano-JASMINE Satellite System and Project Status

    Science.gov (United States)

    Sako, Nobutada

    Intelligent Space Systems Laboratory, The University of Tokyo (ISSL) and National Astronomical Observatory of Japan (NAO) have been developing a small infrared astrometry satellite named “Nano-JASMINE”. The satellite size is about 50cm cubic and 20kg, which plays a pre-cursor role of JASMINE Project which is programmed by NAO and JAXA. In addition, since there has been only one astrometry satellite HIPPARCOS by ESA in the past, Nano-JASMINE is also expected to achieve certain scientific results in the field of astrometry. In this project, ISSL aims to develop new advanced small satellite bus system whose performance is comparable to that of 100-500kg sized satellites, including attitude stability of 1 arc-second and thermal stability of the mission subsystem of 1 mK. This paper overviews the Nano-JASMINE bus system with emphasis on attitude and thermal control systems.

  17. Status of Pantex Plant Waste Management Project/program control system

    International Nuclear Information System (INIS)

    Price, Wesley J.; Matthews, William L.

    1992-01-01

    During a December 1990 Waste Management Program Review held in Albuquerque, New Mexico, the Waste Management and Operational Surety Division (WMOSD) introduced the project control system to be used for the Waste Management (WM) Operations Program. The system was entitled 'TRAC-WM' (Tracking and Control for Waste Management). The stated objective for this system was to establish a frame work for planning, managing, and controlling work within the WM program. As a result Mason and Hanger (the operating contractor at the Pantex Plant) initiated the development of a computerized waste management project tracking system. (author)

  18. Generalized projective synchronization of chaotic systems via adaptive learning control

    International Nuclear Information System (INIS)

    Yun-Ping, Sun; Jun-Min, Li; Hui-Lin, Wang; Jiang-An, Wang

    2010-01-01

    In this paper, a learning control approach is applied to the generalized projective synchronisation (GPS) of different chaotic systems with unknown periodically time-varying parameters. Using the Lyapunov–Krasovskii functional stability theory, a differential-difference mixed parametric learning law and an adaptive learning control law are constructed to make the states of two different chaotic systems asymptotically synchronised. The scheme is successfully applied to the generalized projective synchronisation between the Lorenz system and Chen system. Moreover, numerical simulations results are used to verify the effectiveness of the proposed scheme. (general)

  19. IT Project Management from a Systems Thinking Perspective: A Position Paper

    NARCIS (Netherlands)

    van Eck, Pascal; Ponisio, Laura

    2008-01-01

    We proposes a Systems Thinking approach to the study of IT project management and show how this approach helps project managers in controlling their projects. To illustrate our proposal, we present an example model of the dynamics of IT out-sourcing projects. The example model explains these

  20. Homogenisation in project management for large German research projects in the Earth system sciences: overcoming the institutional coordination bias

    Science.gov (United States)

    Rauser, Florian; Vamborg, Freja

    2016-04-01

    The interdisciplinary project on High Definition Clouds and Precipitation for advancing climate prediction HD(CP)2 (hdcp2.eu) is an example for the trend in fundamental research in Europe to increasingly focus on large national and international research programs that require strong scientific coordination. The current system has traditionally been host-based: project coordination activities and funding is placed at the host institute of the central lead PI of the project. This approach is simple and has the advantage of strong collaboration between project coordinator and lead PI, while exhibiting a list of strong, inherent disadvantages that are also mentioned in this session's description: no community best practice development, lack of integration between similar projects, inefficient methodology development and usage, and finally poor career development opportunities for the coordinators. Project coordinators often leave the project before it is finalized, leaving some of the fundamentally important closing processes to the PIs. This systematically prevents the creation of professional science management expertise within academia, which leads to an automatic imbalance that hinders the outcome of large research programs to help future funding decisions. Project coordinators in academia often do not work in a professional project office environment that could distribute activities and use professional tools and methods between different projects. Instead, every new project manager has to focus on methodological work anew (communication infrastructure, meetings, reporting), even though the technological needs of large research projects are similar. This decreases the efficiency of the coordination and leads to funding that is effectively misallocated. We propose to challenge this system by creating a permanent, virtual "Centre for Earth System Science Management CESSMA" (cessma.com), and changing the approach from host- based to centre-based. This should

  1. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project KDP-C Review

    Science.gov (United States)

    Grindle, Laurie; Sakahara, Robert; Hackenberg, Davis; Johnson, William

    2017-01-01

    The topics discussed are the UAS-NAS project life-cycle and ARMD thrust flow down, as well as the UAS environments and how we operate in those environments. NASA's Armstrong Flight Research Center at Edwards, CA, is leading a project designed to help integrate unmanned air vehicles into the world around us. The Unmanned Aircraft Systems Integration in the National Airspace System project, or UAS in the NAS, will contribute capabilities designed to reduce technical barriers related to safety and operational challenges associated with enabling routine UAS access to the NAS. The project falls under the Integrated Systems Research Program office managed at NASA Headquarters by the agency's Aeronautics Research Mission Directorate. NASA's four aeronautics research centers - Armstrong, Ames Research Center, Langley Research Center, and Glenn Research Center - are part of the technology development project. With the use and diversity of unmanned aircraft growing rapidly, new uses for these vehicles are constantly being considered. Unmanned aircraft promise new ways of increasing efficiency, reducing costs, enhancing safety and saving lives 460265main_ED10-0132-16_full.jpg Unmanned aircraft systems such as NASA's Global Hawks (above) and Predator B named Ikhana (below), along with numerous other unmanned aircraft systems large and small, are the prime focus of the UAS in the NAS effort to integrate them into the national airspace. Credits: NASA Photos 710580main_ED07-0243-37_full.jpg The UAS in the NAS project envisions performance-based routine access to all segments of the national airspace for all unmanned aircraft system classes, once all safety-related and technical barriers are overcome. The project will provide critical data to such key stakeholders and customers as the Federal Aviation Administration and RTCA Special Committee 203 (formerly the Radio Technical Commission for Aeronautics) by conducting integrated, relevant system-level tests to adequately address

  2. Acousto-optic laser projection systems for displaying TV information

    International Nuclear Information System (INIS)

    Gulyaev, Yu V; Kazaryan, M A; Mokrushin, Yu M; Shakin, O V

    2015-01-01

    This review addresses various approaches to television projection imaging on large screens using lasers. Results are presented of theoretical and experimental studies of an acousto-optic projection system operating on the principle of projecting an image of an entire amplitude-modulated television line in a single laser pulse. We consider characteristic features of image formation in such a system and the requirements for its individual components. Particular attention is paid to nonlinear distortions of the image signal, which show up most severely at low modulation signal frequencies. We discuss the feasibility of improving the process efficiency and image quality using acousto-optic modulators and pulsed lasers. Real-time projectors with pulsed line imaging can be used for controlling high-intensity laser radiation. (review)

  3. Acousto-optic laser projection systems for displaying TV information

    Science.gov (United States)

    Gulyaev, Yu V.; Kazaryan, M. A.; Mokrushin, Yu M.; Shakin, O. V.

    2015-04-01

    This review addresses various approaches to television projection imaging on large screens using lasers. Results are presented of theoretical and experimental studies of an acousto-optic projection system operating on the principle of projecting an image of an entire amplitude-modulated television line in a single laser pulse. We consider characteristic features of image formation in such a system and the requirements for its individual components. Particular attention is paid to nonlinear distortions of the image signal, which show up most severely at low modulation signal frequencies. We discuss the feasibility of improving the process efficiency and image quality using acousto-optic modulators and pulsed lasers. Real-time projectors with pulsed line imaging can be used for controlling high-intensity laser radiation.

  4. Acousto-optic laser projection systems for displaying TV information

    Energy Technology Data Exchange (ETDEWEB)

    Gulyaev, Yu V [V.A.Kotel' nikov Institute of Radio Engineering and Electronics, Russian Academy of Sciences, Moscow (Russian Federation); Kazaryan, M A [P N Lebedev Physics Institute, Russian Academy of Sciences, Moscow (Russian Federation); Mokrushin, Yu M [D.V. Efremov Scientific Research Institute of Electrophysical Apparatus (Russian Federation); Shakin, O V [Ioffe Physical Technical Institute, Russian Academy of Sciences, St. Petersburg (Russian Federation)

    2015-04-30

    This review addresses various approaches to television projection imaging on large screens using lasers. Results are presented of theoretical and experimental studies of an acousto-optic projection system operating on the principle of projecting an image of an entire amplitude-modulated television line in a single laser pulse. We consider characteristic features of image formation in such a system and the requirements for its individual components. Particular attention is paid to nonlinear distortions of the image signal, which show up most severely at low modulation signal frequencies. We discuss the feasibility of improving the process efficiency and image quality using acousto-optic modulators and pulsed lasers. Real-time projectors with pulsed line imaging can be used for controlling high-intensity laser radiation. (review)

  5. Case Studies in Application of System Engineering Practices to Capstone Projects

    Science.gov (United States)

    Murphy, Gloria; vanSusante, Paul; Carmen, Christina; Morris, Tommy; Schmidt, Peter; Zalewski, Janusz

    2011-01-01

    The Exploration Systems Mission Directorate (ESMD) of the National Aeronautics and Space Administration (NASA) sponsors a faculty fellowship program that engages researchers with interests aligned with current ESMD development programs. The faculty-members are committed to run a capstone senior design project based- on the materials and experience gained during the fellowship. For the 2010 - 2011 academic year, 5 projects were approved. These projects are in the areas of mechanical and electrical hardware design and optimization, fault prediction and extra planetary civil site preparation. This work summarizes the projects, describes the student teams performing the work, and comments on the integration of Systems Engineering principles into the projects, as well as the affected course curriculums.

  6. Oilfield Flare Gas Electricity Systems (OFFGASES Project)

    Energy Technology Data Exchange (ETDEWEB)

    Rachel Henderson; Robert Fickes

    2007-12-31

    The Oilfield Flare Gas Electricity Systems (OFFGASES) project was developed in response to a cooperative agreement offering by the U.S. Department of Energy (DOE) and the National Energy Technology Laboratory (NETL) under Preferred Upstream Management Projects (PUMP III). Project partners included the Interstate Oil and Gas Compact Commission (IOGCC) as lead agency working with the California Energy Commission (CEC) and the California Oil Producers Electric Cooperative (COPE). The project was designed to demonstrate that the entire range of oilfield 'stranded gases' (gas production that can not be delivered to a commercial market because it is poor quality, or the quantity is too small to be economically sold, or there are no pipeline facilities to transport it to market) can be cost-effectively harnessed to make electricity. The utilization of existing, proven distribution generation (DG) technologies to generate electricity was field-tested successfully at four marginal well sites, selected to cover a variety of potential scenarios: high Btu, medium Btu, ultra-low Btu gas, as well as a 'harsh', or high contaminant, gas. Two of the four sites for the OFFGASES project were idle wells that were shut in because of a lack of viable solutions for the stranded noncommercial gas that they produced. Converting stranded gas to useable electrical energy eliminates a waste stream that has potential negative environmental impacts to the oil production operation. The electricity produced will offset that which normally would be purchased from an electric utility, potentially lowering operating costs and extending the economic life of the oil wells. Of the piloted sites, the most promising technologies to handle the range were microturbines that have very low emissions. One recently developed product, the Flex-Microturbine, has the potential to handle the entire range of oilfield gases. It is deployed at an oilfield near Santa Barbara to run on waste gas

  7. CooMan - a global collaborative project management system

    International Nuclear Information System (INIS)

    Souza, J.M. de; Palma, S.

    1994-01-01

    Project Coordination and Management have long been recognized as an area with growing problems and unsatisfactory solutions. Conciliating flexibility with target achievements is historically the main problem to face. The difficulties have been growing at more than linear ratio with the size and complexity of the Projects being developed in the present days. The HEP communities suffer additional challenges because of the distributed nature of the collaborations, the novelty of each project; and the less authoritarian form of leadership and management of team and individual. This prevents the adoption of more centralized focus on decision. CooMan intends to be a Global Collaborative Project Management System. This paper discusses the basic aspects of the concepts involved, outlining how task coordination, acts of speech, and World-Wide hyper media can be used to support project management activities. A distributed tool to implement such proposition is described, and a first prototype is presented

  8. Milliken Station Demonstration Project FDG retrofit update

    Energy Technology Data Exchange (ETDEWEB)

    Alder, R.C.; Jackson, C.E.; O`Dea, D.T. [and others

    1994-12-31

    The Milliken Clean Coal Demonstration Project is one of the nine Clean Coal Projects selected for funding in Round 4 of the U.S. DOE`s Clean Coal Demonstration Program. The project`s sponsor is New York State Electric and Gas Corporation (NYSEG). Project team members include CONSOL Inc., Saarberg-Holter-Umwelttechnik (SHU), NALCO/FuelTech, Stebbins Engineering and Manufacturing Co., DHR Technologies, and CE Air Preheater. Gilbert/Commonwealth is the Architect/Engineer and Construction Manager for the flue gas desulfurization (FGD) retrofit. The project will provide full-scale demonstration of a combination of innovative emission-reducing technologies and plant upgraded for the control of sulfur dioxide (SO{sub 2}) and nitrogen oxides (NO{sub x}) emissions from a coal-fired steam generator without a significant loss of station efficiency. The overall project goals are the following: 98% SO{sub 2} removal efficiency using limestone while burning high sulfur coal; up to 70% NO{sub x} reduction using the NOXOUT selective non-catalytic reduction (SNCR) technology in conjunction with combustion modifications; minimization of solid waste by producing marketable by-products including commercial grade gypsum, calcium chloride, and fly ash; zero wastewater discharge; maintenance of station efficiency by using a high efficiency heat-pipe air heater system and a low-power-consuming scrubber system. The demonstration project is being conducted at NYSEG`s Milliken Station, located in Lansing, New York. Milliken Station has two 150-MWe pulverized coal-fired units built in the 1950s by Combustion Engineering. The SHU FGD process and the combustion modifications are being installed on both units, but the NOXOUT process, Plant Economic Optimization Advisor (PEOA), and the high-efficiency air heater system will be installed on only one unit.

  9. Uninformative variable elimination assisted by Gram-Schmidt Orthogonalization/successive projection algorithm for descriptor selection in QSAR

    DEFF Research Database (Denmark)

    Omidikia, Nematollah; Kompany-Zareh, Mohsen

    2013-01-01

    Employment of Uninformative Variable Elimination (UVE) as a robust variable selection method is reported in this study. Each regression coefficient represents the contribution of the corresponding variable in the established model, but in the presence of uninformative variables as well as colline......Employment of Uninformative Variable Elimination (UVE) as a robust variable selection method is reported in this study. Each regression coefficient represents the contribution of the corresponding variable in the established model, but in the presence of uninformative variables as well...... as collinearity reliability of the regression coefficient's magnitude is suspicious. Successive Projection Algorithm (SPA) and Gram-Schmidt Orthogonalization (GSO) were implemented as pre-selection technique for removing collinearity and redundancy among variables in the model. Uninformative variable elimination...

  10. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    these objectives should be like. Requirements and effects of the application of project management The goal of the project management methodology is to assist the manager in all of these elements, but also to provide a uniform way of evaluating his performance as an objective comparison of indicators in all projects that are implemented in the system. Project management methodology Efficient business operations and fulfilling the requests of users, or buyers if business is done for the third parties, require modern planning and management of projects using computers and appropriate software. Given that the project management with the help of network models requires frequent and rapid processing of large amount of data, it is obvious that the application of computers in this area is of utmost importance. System of reporting on project implementation To achieve effective monitoring, control and implementation of control actions, it is necessary to organize an effective reporting system that will provide timely and realistic information about the real state of the project, in terms of job performing time, the resources spent and the costs of project implementation. Concept of risk management In any project there are many different risk events by type, the probability of appearance, manner and size of the impact of the project. The process of testing the nature of risk events in the project as well as their potential impact on the outcome of the project and their interdependence are realized through the risk analysis. Conclusion Methodologies of project management surged from these differences, when it became apparent that a unified approach to the problem of project managing does not meet the unique project requirements. Taking into account that in the future projects will become more complex and that the methodology of project management will be required to deal with such projects, a proper selection of methodology within the organization is extremely important.

  11. Measure Guideline: Selecting Ventilation Systems for Existing Homes

    Energy Technology Data Exchange (ETDEWEB)

    Aldrich, R. [Consortium for Advanced Residential Buildings (CARB), Norwalk, CT (United States)

    2014-02-01

    This report, developed by Building America research team CARB, addresses adding or improving mechanical ventilation systems to existing homes. The goal of this report is to assist decision makers and contractors in making informed decisions when selecting ventilation systems for homes. With more air-sealed envelopes, a mechanical means of removing contaminants is critical for indoor environmental quality and building durability. The purpose of ventilation is to remove contaminants from homes, and this report discusses where, when, and how much ventilation is appropriate in a home, including examination of relevant codes and standards. Choosing the "best" system is not always straightforward; selecting a system involves balancing performance, efficiency, cost, required maintenance, and several other factors.

  12. Selective maintenance of multi-state systems with structural dependence

    International Nuclear Information System (INIS)

    Dao, Cuong D.; Zuo, Ming J.

    2017-01-01

    This paper studies the selective maintenance problem for multi-state systems with structural dependence. Each component can be in one of multiple working levels and several maintenance actions are possible to a component in a maintenance break. The components structurally form multiple hierarchical levels and dependence groups. A directed graph is used to represent the precedence relations of components in the system. A selective maintenance optimization model is developed to maximize the system reliability in the next mission under time and cost constraints. A backward search algorithm is used to determine the assembly sequence for a selective maintenance scenario. The maintenance model helps maintenance managers in determining the best combination of maintenance activities to maximize the probability of successfully completing the next mission. Examples showing the use of the proposed method are presented. - Highlights: • A selective maintenance model for multi-state systems is proposed considering both economic and structural dependence. • Structural dependence is modeled as precedence relationship when disassembling components for maintenance. • Resources for disassembly and maintenance are evaluated using a backward search algorithm. • Maintenance strategies with and without structural dependence are analyzed. • Ignoring structural dependence may lead to over-estimation of system reliability.

  13. Multi-detector and systematic imaging system designed and developed within the New AGLAE project

    Energy Technology Data Exchange (ETDEWEB)

    Pichon, L.; Pacheco, C.; Moignard, B.; Lemasson, Q. [C2RMF - Palais du Louvre 14 quai F Mitterrand 75001, Paris (France); FR3605 - MCC/CNRS/UPMC (France); Guillou, T.; Walter, Ph [FR3605 - CC/CNRS/UPMC (France); LAMS - UMR 8220 - CNRS/UPMC - Seine, Paris (France)

    2013-07-01

    Full text: The New AGLAE project aims to establish a world-class facility for non invasive analysis of Cultural Heritage materials. One of the objectives of the New AGLAE project is to increase the x-ray measurement detection, enabling to reduce the beam intensity thus the interaction with sensitive artworks by a ten. Multidisciplinary, the New AGLAE project will provide an exceptional and multipurpose beam line with a performance in spatial resolution, beam stability and a capability of multi-particle detection much higher than for the previous facility. The New AGLAE will give fundamental elements for the understanding of the structure of materials, their composition, properties, and change over time. One of the objectives of this project is to design and set up a new data acquisition system. To reach that purpose, the surface and the number of PIXE detectors have been increased. Indeed, a 10 mm{sup 2} and a 30 mm{sup 3} Si(Li) detectors respectively dedicated to low and high energy measurements, were replaced by a cluster of five 50 mm{sup 2} S.D.D. detectors. If this multi detector enables to decrease the intensity of the incident beam by one order of magnitude, involving less irradiation during the analysis, it can also provide large and/or fast maps. So as to digital the preamp pulses obtained from the detectors, a custom Digital X-ray Processor provides both digital data and control signals compatible to a multiparameter multichannel system. This multiparameter system saves each event from x-ray, gamma and particle detectors and simultaneously the X, Y positions of the beam on the sample as a list file. Furthermore, to draw several-cm-sized maps with a 20/40μm resolution, the scanning of the area originally combines a fast vertical magnetic deflection of the beam and a mechanical movement of the target. To process the data, several homemade software have been developed or updated so as to rebuild any matrix of spectra, to re-bin maps, to process a series of

  14. Image reconstruction technique using projection data from neutron tomography system

    Directory of Open Access Journals (Sweden)

    Waleed Abd el Bar

    2015-12-01

    Full Text Available Neutron tomography is a very powerful technique for nondestructive evaluation of heavy industrial components as well as for soft hydrogenous materials enclosed in heavy metals which are usually difficult to image using X-rays. Due to the properties of the image acquisition system, the projection images are distorted by several artifacts, and these reduce the quality of the reconstruction. In order to eliminate these harmful effects the projection images should be corrected before reconstruction. This paper gives a description of a filter back projection (FBP technique, which is used for reconstruction of projected data obtained from transmission measurements by neutron tomography system We demonstrated the use of spatial Discrete Fourier Transform (DFT and the 2D Inverse DFT in the formulation of the method, and outlined the theory of reconstruction of a 2D neutron image from a sequence of 1D projections taken at different angles between 0 and π in MATLAB environment. Projections are generated by applying the Radon transform to the original image at different angles.

  15. THE zCOSMOS-SINFONI PROJECT. I. SAMPLE SELECTION AND NATURAL-SEEING OBSERVATIONS

    Energy Technology Data Exchange (ETDEWEB)

    Mancini, C.; Renzini, A. [INAF-OAPD, Osservatorio Astronomico di Padova, Vicolo Osservatorio 5, I-35122 Padova (Italy); Foerster Schreiber, N. M.; Hicks, E. K. S.; Genzel, R.; Tacconi, L.; Davies, R. [Max-Planck-Institut fuer Extraterrestrische Physik, Giessenbachstrasse, D-85748 Garching (Germany); Cresci, G. [Osservatorio Astrofisico di Arcetri (OAF), INAF-Firenze, Largo E. Fermi 5, I-50125 Firenze (Italy); Peng, Y.; Lilly, S.; Carollo, M.; Oesch, P. [Institute of Astronomy, Department of Physics, Eidgenossische Technische Hochschule, ETH Zurich CH-8093 (Switzerland); Vergani, D.; Pozzetti, L.; Zamorani, G. [INAF-Bologna, Via Ranzani, I-40127 Bologna (Italy); Daddi, E. [CEA-Saclay, DSM/DAPNIA/Service d' Astrophysique, F-91191 Gif-Sur Yvette Cedex (France); Maraston, C. [Institute of Cosmology and Gravitation, University of Portsmouth, Dennis Sciama Building, Burnaby Road, PO1 3HE Portsmouth (United Kingdom); McCracken, H. J. [IAP, 98bis bd Arago, F-75014 Paris (France); Bouche, N. [Department of Physics, University of California, Santa Barbara, CA 93106 (United States); Shapiro, K. [Aerospace Research Laboratories, Northrop Grumman Aerospace Systems, Redondo Beach, CA 90278 (United States); and others

    2011-12-10

    The zCOSMOS-SINFONI project is aimed at studying the physical and kinematical properties of a sample of massive z {approx} 1.4-2.5 star-forming galaxies, through SINFONI near-infrared integral field spectroscopy (IFS), combined with the multiwavelength information from the zCOSMOS (COSMOS) survey. The project is based on one hour of natural-seeing observations per target, and adaptive optics (AO) follow-up for a major part of the sample, which includes 30 galaxies selected from the zCOSMOS/VIMOS spectroscopic survey. This first paper presents the sample selection, and the global physical characterization of the target galaxies from multicolor photometry, i.e., star formation rate (SFR), stellar mass, age, etc. The H{alpha} integrated properties, such as, flux, velocity dispersion, and size, are derived from the natural-seeing observations, while the follow-up AO observations will be presented in the next paper of this series. Our sample appears to be well representative of star-forming galaxies at z {approx} 2, covering a wide range in mass and SFR. The H{alpha} integrated properties of the 25 H{alpha} detected galaxies are similar to those of other IFS samples at the same redshifts. Good agreement is found among the SFRs derived from H{alpha} luminosity and other diagnostic methods, provided the extinction affecting the H{alpha} luminosity is about twice that affecting the continuum. A preliminary kinematic analysis, based on the maximum observed velocity difference across the source and on the integrated velocity dispersion, indicates that the sample splits nearly 50-50 into rotation-dominated and velocity-dispersion-dominated galaxies, in good agreement with previous surveys.

  16. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    Science.gov (United States)

    Lawrence N. Hudson; Joseph Wunderle M.; And Others

    2016-01-01

    The PREDICTS project—Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)—has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity of human impacts relating to land use. We have used this evidence base to...

  17. Project Management Information System: the Role and the Issues of Implementation

    Directory of Open Access Journals (Sweden)

    Dumitru OPREA

    2006-01-01

    Full Text Available We are coping more and more with the project and project management in day by day life. Even if some activities are the similarly with common organization actions, the life cycle project activities request more information and more actions. So it is necessary to have some tools, methods and rules to manage a large amount of information which must be disseminated to numerous stakeholders. This need could be solved by project management information systems (PMIS. PMIS is a complex one, with various components which are depending on type of project, type of organization etc. The latest evolution of information and communication technology was favorable to our research field. Therefore, there are different tools to support the structure, automation and efficiency of PMIS. Moreover from several years it is spread the following notions: web-based project management, project management office, enterprise project management. So, we can see the fast evolution of this field. But, our paper will bring general ideas relating to project management information systems, like definition of PMIS, the project life cycle and the information needed of each stage, various tools to support the PMIS procedures. The characteristics, tools, trends will be our future research.

  18. The system of employees motivation in a selected company

    OpenAIRE

    BEEROVÁ, Petra

    2014-01-01

    The system of employees motivation in a selected company is the title of this thesis that closely analyzes the system of employees motivation in a selected company and outlines some suggestions that could improve the management and performance in this area. Moreover, the focus is placed towards the motivation of employees in the workplace.

  19. A project management system for the X-29A flight test program

    Science.gov (United States)

    Stewart, J. F.; Bauer, C. A.

    1983-01-01

    The project-management system developed for NASA's participation in the X-29A aircraft development program is characterized from a theoretical perspective, as an example of a system appropriate to advanced, highly integrated technology projects. System-control theory is applied to the analysis of classical project-management techniques and structures, which are found to be of closed-loop multivariable type; and the effects of increasing project complexity and integration are evaluated. The importance of information flow, sampling frequency, information holding, and delays is stressed. The X-29A system is developed in four stages: establishment of overall objectives and requirements, determination of information processes (block diagrams) definition of personnel functional roles and relationships, and development of a detailed work-breakdown structure. The resulting system is shown to require a greater information flow to management than conventional methods. Sample block diagrams are provided.

  20. Volunteered Geographic Information System Design: Project and Participation Guidelines

    Directory of Open Access Journals (Sweden)

    José-Pablo Gómez-Barrón

    2016-07-01

    Full Text Available This article sets forth the early phases of a methodological proposal for designing and developing Volunteered Geographic Information (VGI initiatives based on a system perspective analysis in which the components depend and interact dynamically among each other. First, it focuses on those characteristics of VGI projects that present different goals and modes of organization, while using a crowdsourcing strategy to manage participants and contributions. Next, a tool is developed in order to design the central crowdsourced processing unit that is best suited for a specific project definition, associating it with a trend towards crowd-based or community-driven approaches. The design is structured around the characterization of different ways of participating, and the task cognitive demand of working on geo-information management, spatial problem solving and ideation, or knowledge acquisition. Then, the crowdsourcing process design helps to identify what kind of participants are needed and outline subsequent engagement strategies. This is based on an analysis of differences among volunteers’ participatory behaviors and the associated set of factors motivating them to contribute, whether on a crowd or community-sourced basis. From a VGI system perspective, this paper presents a set of guidelines and methodological steps in order to align project goals, processes and volunteers and thus successfully attract participation. This methodology helps establish the initial requirements for a VGI system, and, in its current state, it mainly focuses on two components of the system: project and participants.

  1. Integrated monitoring and surveillance system demonstration project: Phase I accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Crawford, D.C.

    1997-01-01

    The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables

  2. NNWSI project information management system concepts evaluation report. Final report

    International Nuclear Information System (INIS)

    1986-08-01

    This report is intended as a first step in developing detailed information management system specifications for the Nevada Nuclear Waste Storage Investigations (NNWSI) Project. The current state of information management at the NNWSI Project level is investigated and an information management system (IMS) is proposed. The IMS as it relates to aspects of Project and records management is discussed. Information management concepts and prospective IMS system components are investigated. Concepts and system components include: indexing, searching, retrieval, data base management system technology, computers, storage media, computer-assisted retrieval (CAR) of microfilm, electronic imaging-based systems, optical character recognition, and communications. Performance criteria and desirable system attributes applicable to the IMS are discussed. Six conceptual system approaches capable of satisfying the performance criteria are defined. System approaches include: fully centralized microfilm system based on CAR retrieval (Approach 1), partially distributed microfilm system based on CAR retrieval (Approach 2), fully distributed microfilm system based on CAR retrieval (Approach 3), fully centralized optical disk system based on electronic image and full-text retrieval (Approach 4), partially distributed optical system based on electron image and full-text retrieval (Approach 5), and fully distributed optical disk system based on electronic image and full-text retrieval (Approach 6). Technical and cost considerations associated with the six conceptual approaches are evaluated. Technical evaluation results indicate Approach 4 is the best conceptual approach, and cost evaluation results show no significant differences among approaches. On the basis of the evaluation, Approach 4 is recommended

  3. Promoting system-level learning from project-level lessons

    Energy Technology Data Exchange (ETDEWEB)

    Jong, Amos A. de, E-mail: amosdejong@gmail.com [Innovation Management, Utrecht (Netherlands); Runhaar, Hens A.C., E-mail: h.a.c.runhaar@uu.nl [Section of Environmental Governance, Utrecht University, Utrecht (Netherlands); Runhaar, Piety R., E-mail: piety.runhaar@wur.nl [Organisational Psychology and Human Resource Development, University of Twente, Enschede (Netherlands); Kolhoff, Arend J., E-mail: Akolhoff@eia.nl [The Netherlands Commission for Environmental Assessment, Utrecht (Netherlands); Driessen, Peter P.J., E-mail: p.driessen@geo.uu.nl [Department of Innovation and Environment Sciences, Utrecht University, Utrecht (Netherlands)

    2012-02-15

    A growing number of low and middle income nations (LMCs) have adopted some sort of system for environmental impact assessment (EIA). However, generally many of these EIA systems are characterised by a low performance in terms of timely information dissemination, monitoring and enforcement after licencing. Donor actors (such as the World Bank) have attempted to contribute to a higher performance of EIA systems in LMCs by intervening at two levels: the project level (e.g. by providing scoping advice or EIS quality review) and the system level (e.g. by advising on EIA legislation or by capacity building). The aims of these interventions are environmental protection in concrete cases and enforcing the institutionalisation of environmental protection, respectively. Learning by actors involved is an important condition for realising these aims. A relatively underexplored form of learning concerns learning at EIA system-level via project level donor interventions. This 'indirect' learning potentially results in system changes that better fit the specific context(s) and hence contribute to higher performances. Our exploratory research in Ghana and the Maldives shows that thus far, 'indirect' learning only occurs incidentally and that donors play a modest role in promoting it. Barriers to indirect learning are related to the institutional context rather than to individual characteristics. Moreover, 'indirect' learning seems to flourish best in large projects where donors achieved a position of influence that they can use to evoke reflection upon system malfunctions. In order to enhance learning at all levels donors should thereby present the outcomes of the intervention elaborately (i.e. discuss the outcomes with a large audience), include practical suggestions about post-EIS activities such as monitoring procedures and enforcement options and stimulate the use of their advisory reports to generate organisational memory and ensure a better

  4. Promoting system-level learning from project-level lessons

    International Nuclear Information System (INIS)

    Jong, Amos A. de; Runhaar, Hens A.C.; Runhaar, Piety R.; Kolhoff, Arend J.; Driessen, Peter P.J.

    2012-01-01

    A growing number of low and middle income nations (LMCs) have adopted some sort of system for environmental impact assessment (EIA). However, generally many of these EIA systems are characterised by a low performance in terms of timely information dissemination, monitoring and enforcement after licencing. Donor actors (such as the World Bank) have attempted to contribute to a higher performance of EIA systems in LMCs by intervening at two levels: the project level (e.g. by providing scoping advice or EIS quality review) and the system level (e.g. by advising on EIA legislation or by capacity building). The aims of these interventions are environmental protection in concrete cases and enforcing the institutionalisation of environmental protection, respectively. Learning by actors involved is an important condition for realising these aims. A relatively underexplored form of learning concerns learning at EIA system-level via project level donor interventions. This ‘indirect’ learning potentially results in system changes that better fit the specific context(s) and hence contribute to higher performances. Our exploratory research in Ghana and the Maldives shows that thus far, ‘indirect’ learning only occurs incidentally and that donors play a modest role in promoting it. Barriers to indirect learning are related to the institutional context rather than to individual characteristics. Moreover, ‘indirect’ learning seems to flourish best in large projects where donors achieved a position of influence that they can use to evoke reflection upon system malfunctions. In order to enhance learning at all levels donors should thereby present the outcomes of the intervention elaborately (i.e. discuss the outcomes with a large audience), include practical suggestions about post-EIS activities such as monitoring procedures and enforcement options and stimulate the use of their advisory reports to generate organisational memory and ensure a better information

  5. Implementing the theories: A fully integrated project control system that's implemented and works

    International Nuclear Information System (INIS)

    Harris, R.E.

    1994-01-01

    Using the theories presented in DOE Orders 4700.1, 1332.1A, and Notice 4700.5 as the basis for system design, the Fernald Environmental Restoration Management Corporation (FERMCO) has developed and implemented a Project Control System (PCS) that complies with requirements and provides DOE and FERMCO management with timely performance measurement information. To this extent, the FERMCO PCS probably is similar to the systems of the majority of the contractors in the DOE complex. In fact. this facet of the FERMCO PCS generally mirrors those used on projects around the world by FERMCO's parent company, Fluor Daniel. Starting with this open-quotes platformclose quotes, the vision and challenge of creating a fully integrated system commenced. An open-architecture systems approach is the factor that most greatly influenced and enabled the successful development and implementation of the Project Control System for the Fernald Environmental Management Project. All aspects of a fully integrated system were considered during the design phase. The architecture of the FERMCO system enables seamless, near real-time, transfer of data both from and to the Project Control System with all other related systems. The primary systems that provide and share data with the Project Control System include those used by the Payroll, Accounting, Procurement, and Human Resources organizations. To enable data linking with these organizations, the resource codes were designed to map many-to-one from their detailed codes to the summarized codes used in the PCS

  6. Study and project of a radiation monitoring system in ships

    International Nuclear Information System (INIS)

    Morgado, Mario Monteiro

    1998-01-01

    In this work we present the project and the development of a radiation detection system for use in ships, called RADINAC. This system was developed to measure the radiation in several points of the ship and to give the dose rates and total dose. The radioactive activity of the sea water is also measured. The project was based on a system developed in the middle of the seventies which is not working due to the lack of some mechanical and electronic components. The RADINAC system was developed in order to nationalize and modernize the old project. The detectors used are plastic scintillator to measure the sea water radioactive activity and ionization chambers to measure the dose rates. The nuclear instrumentation has only three imported items: acquisition data board, picoamperimeter and photomultiplier tube. All the other items are made in Brazil. With regard to the data acquisition, we used the Labwindows software to create the 'virtual instruments' in order to display the data on the computer monitor. (author)

  7. Measure Guideline: Selecting Ventilation Systems for Existing Homes

    Energy Technology Data Exchange (ETDEWEB)

    Aldrich, Robb [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2014-02-01

    This document addresses adding -or improving - mechanical ventilation systems to existing homes. The purpose of ventilation is to remove contaminants from homes, and this report discusses where, when, and how much ventilation is appropriate in a home, including some discussion of relevant codes and standards. Advantages, disadvantages, and approximate costs of various system types are presented along with general guidelines for implementing the systems in homes. CARB intends for this document to be useful to decision makers and contractors implementing ventilation systems in homes. Choosing the "best" system is not always straightforward; selecting a system involves balancing performance, efficiency, cost, required maintenance, and several other factors. It is the intent of this document to assist contractors in making more informed decisions when selecting systems. Ventilation is an integral part of a high-performance home. With more air-sealed envelopes, a mechanical means of removing contaminants is critical for indoor environmental quality and building durability.

  8. Method for Business Process Management System Selection

    OpenAIRE

    Westelaken, van de, Thijs; Terwee, Bas; Ravesteijn, Pascal

    2013-01-01

    In recent years business process management (BPM) and specifically information systems that support the analysis, design and execution of processes (also called business process management systems (BPMS)) are getting more attention. This has lead to an increase in research on BPM and BPMS. However the research on BPMS is mostly focused on the architecture of the system and how to implement such systems. How to select a BPM system that fits the strategy and goals of a specific organization is ...

  9. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  10. System driven technology selection for future European launch systems

    Science.gov (United States)

    Baiocco, P.; Ramusat, G.; Sirbi, A.; Bouilly, Th.; Lavelle, F.; Cardone, T.; Fischer, H.; Appel, S.

    2015-02-01

    In the framework of the next generation launcher activity at ESA, a top-down approach and a bottom-up approach have been performed for the identification of promising technologies and alternative conception of future European launch vehicles. The top-down approach consists in looking for system-driven design solutions and the bottom-up approach features design solutions leading to substantial advantages for the system. The main investigations have been focused on the future launch vehicle technologies. Preliminary specifications have been used in order to permit sub-system design to find the major benefit for the overall launch system. The development cost, non-recurring and recurring cost, industrialization and operational aspects have been considered as competitiveness factors for the identification and down-selection of the most interesting technologies. The recurring cost per unit payload mass has been evaluated. The TRL/IRL has been assessed and a preliminary development plan has been traced for the most promising technologies. The potentially applicable launch systems are Ariane and VEGA evolution. The main FLPP technologies aim at reducing overall structural mass, increasing structural margins for robustness, metallic and composite containment of cryogenic hydrogen and oxygen propellants, propellant management subsystems, elements significantly reducing fabrication and operational costs, avionics, pyrotechnics, etc. to derive performing upper and booster stages. Application of the system driven approach allows creating performing technology demonstrators in terms of need, demonstration objective, size and cost. This paper outlines the process of technology down selection using a system driven approach, the accomplishments already achieved in the various technology fields up to now, as well as the potential associated benefit in terms of competitiveness factors.

  11. Design of project management system for 10 MW high temperature gas-cooled test reactor

    International Nuclear Information System (INIS)

    Zhu Yan; Xu Yuanhui

    1998-01-01

    A framework of project management information system (MIS) for 10 MW high temperature gas-cooled test reactor is introduced. Based on it, the design of nuclear project management information system and project monitoring system (PMS) are given. Additionally, a new method of developing MIS and Decision Support System (DSS) has been tried

  12. Organizational Considerations for Implementing Systems Engineering and Integration in the Ares Projects Office

    Science.gov (United States)

    Thomas, LeAnn; Doreswamy, Rajiv N.

    2008-01-01

    Systems Engineering and Integration (SE&I) is a critical discipline in developing new space systems. In 2005, NASA performed an internal study of 24 agency and Department of Defense (DoD) programs to evaluate methods of integrating SE&I practices and determine their effectiveness. The goal of the study was to determine the best SE&I implementation strategy for the Ares Projects Office. The study identified six SE&I organizational structures: 1. Lead systems integrator (LSI) with SE&I responsibility and government technical insight. 2a. Integration contractor with government SE&I responsibility (government insight). 2b. Integration contractor with government SE&I responsibility (government oversight). 3a. Prime contractor with SE&I responsibility (government insight). 3b. Prime contractor with SE&I responsibility (government oversight). 3c. Prime contractor with SE&I responsibility (government/industry partnership). 4a.Prime contractor with government SE&I responsibility (government insight). 4b. Prime contractor with government SE&I responsibility (government oversight). 4d.Prime contractors with total system performance responsibility (TSPR). 5. Prime contractor with government SE&I responsibility and integration products through a Federally Funded Research and Development Center (FFRDC). 6. Government/FFRDC in-house development with SE&I responsibility and function. The organizational structure used most often was number 4, using a prime contractor with government SE&I responsibility and government technical insight. However, data analyses did not establish a positive relationship between program development costs and specific SE&I organizational types, nor did it positively determine the relationship between successful programs or projects and their SE&I structure. The SE&I study reached the following conclusions: (1) Large, long-duration, technically complex programs or projects reach their technical goals, but rarely meet schedule or cost goals. NASA's recent

  13. Computerized adaptive testing item selection in computerized adaptive learning systems

    NARCIS (Netherlands)

    Eggen, Theodorus Johannes Hendrikus Maria; Eggen, T.J.H.M.; Veldkamp, B.P.

    2012-01-01

    Item selection methods traditionally developed for computerized adaptive testing (CAT) are explored for their usefulness in item-based computerized adaptive learning (CAL) systems. While in CAT Fisher information-based selection is optimal, for recovering learning populations in CAL systems item

  14. The PRINCE Project and its Applications (clone)

    OpenAIRE

    Bescos, Sylvie; Bisière, Christophe; Gailly, Pierre-Joseph; Krautter, Wolfgang

    1992-01-01

    The Esprit project Prince aims at development of an industrial Constraint Logic Programing environment based on the Prolog III language. In parallel, the current technology is being validated within the project on representative real-world examples. This paper describes the current status of the three application domains which were Selected to demonstrate the applicability and usefulness of CLP. These applications deal with industrial systems engineering, medium term banking planning and jobs...

  15. The global unified parallel file system (GUPFS) project: FY 2002 activities and results

    Energy Technology Data Exchange (ETDEWEB)

    Butler, Gregory F.; Lee, Rei Chi; Welcome, Michael L.

    2003-04-07

    The Global Unified Parallel File System (GUPFS) project is a multiple-phase, five-year project at the National Energy Research Scientific Computing (NERSC) Center to provide a scalable, high performance, high bandwidth, shared file system for all the NERSC production computing and support systems. The primary purpose of the GUPFS project is to make it easier to conduct advanced scientific research using the NERSC systems. This is to be accomplished through the use of a shared file system providing a unified file namespace, operating on consolidated shared storage that is directly accessed by all the NERSC production computing and support systems. During its first year, FY 2002, the GUPFS project focused on identifying, testing, and evaluating existing and emerging shared/cluster file system, SAN fabric, and storage technologies; identifying NERSC user input/output (I/O) requirements, methods, and mechanisms; and developing appropriate benchmarking methodologies and benchmark codes for a parallel environment. This report presents the activities and progress of the GUPFS project during its first year, the results of the evaluations conducted, and plans for near-term and longer-term investigations.

  16. The ARCHER Project

    International Nuclear Information System (INIS)

    Knol, S.; Roelofs, F.; Fütterer, M.A.; Kohtz, N.; Laurie, M.; Buckthorpe, D.; Scheuermann, W.

    2014-01-01

    The European HTR R&D project ARCHER (Advanced High-Temperature Reactors for Cogeneration of Heat and Electricity R&D) builds on a solid HTR technology foundation in Europe, established through former national UK and German HTR programs and in European programs. ARCHER runs from 2011 to 2015 and targets selected HTR R&D subjects that would specifically support demonstration, with a focus on experimental effort. In line with the R&D and deployment strategy of the European Sustainable Nuclear Energy Technology Platform (SNETP) ARCHER contributes to maintaining, strengthening and expanding the HTR knowledge base in Europe to lay the foundations for demonstration of nuclear cogeneration with HTR systems. The project consortium encompasses conventional and nuclear industry, utilities, Technical Support Organizations, R&D organizations and academia. ARCHER shares results with international partners in the Generation IV International Forum and collaborates directly with related projects in the US, China, Japan, the Republic of Korea and South Africa. The ARCHER project is in its final year, and the paper comprises an overview of the achievements thus far for the different Sub Projects. (author)

  17. 3D reconstruction of laser projective point with projection invariant generated from five points on 2D target.

    Science.gov (United States)

    Xu, Guan; Yuan, Jing; Li, Xiaotao; Su, Jian

    2017-08-01

    Vision measurement on the basis of structured light plays a significant role in the optical inspection research. The 2D target fixed with a line laser projector is designed to realize the transformations among the world coordinate system, the camera coordinate system and the image coordinate system. The laser projective point and five non-collinear points that are randomly selected from the target are adopted to construct a projection invariant. The closed form solutions of the 3D laser points are solved by the homogeneous linear equations generated from the projection invariants. The optimization function is created by the parameterized re-projection errors of the laser points and the target points in the image coordinate system. Furthermore, the nonlinear optimization solutions of the world coordinates of the projection points, the camera parameters and the lens distortion coefficients are contributed by minimizing the optimization function. The accuracy of the 3D reconstruction is evaluated by comparing the displacements of the reconstructed laser points with the actual displacements. The effects of the image quantity, the lens distortion and the noises are investigated in the experiments, which demonstrate that the reconstruction approach is effective to contribute the accurate test in the measurement system.

  18. Designing and Conducting Health Systems Research Projects ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Home · Resources · Publications. Designing and Conducting Health Systems Research Projects Volume 1: Proposal Development and Fieldwork ... IDRC and the United Kingdom's Global AMR Innovation Fund—managed by the ... New website will help record vital life events to improve access to services for all.

  19. 76 FR 12354 - Cumberland System of Projects

    Science.gov (United States)

    2011-03-07

    ... Third Scenario--Return to Original Marketing Policy Inside TVA Preference Customers Capacity and Base.... Discussion: The marketing policy for the Cumberland System of Projects provides peaking capacity, along with 1500 hours of energy annually with each kilowatt of capacity, to customers outside the Tennessee Valley...

  20. Project risk management in complex petrochemical system

    Directory of Open Access Journals (Sweden)

    Kirin Snežana

    2012-01-01

    Full Text Available Investigation of risk in complex industrial systems, as well as evaluation of main factors influencing decision making and implementation process using large petrochemical company as an example, has proved the importance of successful project risk management. This is even more emphasized when analyzing systems with complex structure, i.e. with several organizational units. It has been shown that successful risk management requires modern methods, based on adequate application of statistical analysis methods.

  1. Evaluating the Peruvian Rural Communication Services Project.

    Science.gov (United States)

    Mayo, John

    1988-01-01

    Reviews the Peruvian Rural Communication Services (PRCS) Project and outlines selected findings. Topics discussed include a brief description of Peru's economic and social conditions; satellite communication systems; audio teleconferencing; telephone service; planning and administration; research design features; data collection; and project…

  2. 42 CFR 403.308 - State systems under demonstration projects-mandatory approval.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false State systems under demonstration projects..., DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS SPECIAL PROGRAMS AND PROJECTS Recognition of State... approval of a State system are met under § 403.304 (b)(1)-(10) and § 403.304(c), and, if appropriate § 403...

  3. The Fox Project: Advanced Development of Systems Software

    National Research Council Canada - National Science Library

    1999-01-01

    The long-term objectives of the Carnegie Mellon Fox Project are to improve the design and construction of systems software and to further the development of advanced programming language technology...

  4. The Fox Project: Advanced Development of Systems Software

    National Research Council Canada - National Science Library

    2000-01-01

    The long-term objectives of the Carnegie Mellon Fox Project are to improve the design and construction of systems software and to further the development of advanced programming language technology...

  5. Factors of site selection for nuclear power plants in selected industrial states

    International Nuclear Information System (INIS)

    Hoffmann, L.; Obermair, G.; Ringler, W.; Romahn, B.; Sanders, H.

    1978-01-01

    The range of the tasks within the project consists of working out an optimal catalogue of criteria for the site selection for nuclear power plants; establishing a structured documentation system for the criteria and licensing procedures used by selected industrial countries when selecting sites for nuclear power plants; analyzing and evaluating the documented material with the aim of supplying the basis for decisions concerning land use. The tasks are being realized within a technological ring of data (for the period until 1990, reactor types, cooling, power-heat coupling, special sites, block sizes, local concentration) and a set politico-economical ring of data for the following countries: F.R. Germany, Belgium, Switzerland, Great Britain, Sweden, Denmark, Austria, France, Netherlands, USA, Japan, Yougoslavia. (HP) [de

  6. Sandia photovoltaic systems definition and application experiment projects

    Energy Technology Data Exchange (ETDEWEB)

    Jones, G.

    1983-04-01

    A compilation is given of the abstracts and visual material used in presentation at the Fourth Photovoltaic Systems Definition and Applications Projects Integration Meeting held at the Marriott Hotel, April 12-14, 1983, in Albuquerque, New Mexico. The meeting provided a forum for detailed analyses on recently completed and current activities. These activities include systems research, balance-of-system technology development, residential experimentation, and evaluation of intermediate-sized applications.

  7. Technical specification for the Quality Information Management System (QIMS) Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Hall, R.C.; Claussen, L.M.; Thurston, I.

    1992-01-01

    This document contains implementation details for the Quality Information Management System (QIMS) Pilot Project, which has been released for VAX/VMS systems using the INGRES RDBMS. The INGRES Applications-By-Forms (ABF) software development tool was used to define the modules and screens which comprise the QIMS Pilot application. These specifications together with the QIMS information model and corresponding database definition constitute the QIMS technical specification and implementation description presented herein. The QIMS Pilot Project represents a completed software product which has been released for production use. Further extension projects are planned which will release new versions for QIMS. These versions will offer expanded and enhanced functionality to meet further customer requirements not accommodated by the QIMS Pilot Project.

  8. Guide on Project Web Access of SFR R and D and Technology Monitoring System

    International Nuclear Information System (INIS)

    Lee, Dong Uk; Won, Byung Chool; Lee, Yong Bum; Kim, Young In; Hahn, Do Hee

    2008-09-01

    The SFR R and D and technology monitoring system based on the MS enterprise project management is developed for systematic effective management of 'Development of Basic Key Technologies for Gen IV SFR' project which was performed under the Mid- and Long-term Nuclear R and D Program sponsored by the Ministry of Education, Science and Technology. This system is a tool for project management based on web access. Therefore this manual is a detailed guide for Project Web Access(PWA). Section 1 describes the common guide for using of system functions such as project server 2007 client connection setting, additional outlook function setting etc. The section 2 describes the guide for system administrator. It is described the guide for project management in section 3, 4

  9. Guide on Project Web Access of SFR R and D and Technology Monitoring System

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dong Uk; Won, Byung Chool; Lee, Yong Bum; Kim, Young In; Hahn, Do Hee

    2008-09-15

    The SFR R and D and technology monitoring system based on the MS enterprise project management is developed for systematic effective management of 'Development of Basic Key Technologies for Gen IV SFR' project which was performed under the Mid- and Long-term Nuclear R and D Program sponsored by the Ministry of Education, Science and Technology. This system is a tool for project management based on web access. Therefore this manual is a detailed guide for Project Web Access(PWA). Section 1 describes the common guide for using of system functions such as project server 2007 client connection setting, additional outlook function setting etc. The section 2 describes the guide for system administrator. It is described the guide for project management in section 3, 4.

  10. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  11. Pingston hydroelectric project - stage 2 project report : volume 1 of 2

    International Nuclear Information System (INIS)

    1999-01-01

    The British Columbia Environmental Assessment Office has reviewed an application by Canadian Hydro Developers (B.C.) Inc., to develop the Pingston Hydroelectric Project, a run-of-river facility, located 60 km south of Revelstoke, British Columbia. The review includes an evaluation of any social and environmental impacts, including the effects on migratory birds, small mammals, amphibians, fish, wildlife, water quality, noise and visual aspects, that would be associated with the project. One consideration in selecting the project site was its ease of access along existing roadways and close proximity to power lines, another, the absence of any potential effects on fish and fish habitat. The project is also expected to have a negligible effect on water quality- related matters such as sediment transport, nutrient trapping in the headpond, and movement of large organic debris through the system. The project will not impact on archaeological resources, offers a renewable supply of energy and represents an overall positive effect on air quality for British Columbia. BC Hydro has committed to providing electrical interconnection to the main grid. 9 refs., 5 tabs., 14 figs., 9 appendices

  12. Solid waste information and tracking system server conversion project management plan

    International Nuclear Information System (INIS)

    MAY, D.L.

    1999-01-01

    The Project Management Plan governing the conversion of Solid Waste Information and Tracking System (SWITS) to a client-server architecture. The Solid Waste Information and Tracking System Project Management Plan (PMP) describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents

  13. Software qualification for digital safety system in KNICS project

    International Nuclear Information System (INIS)

    Kwon, Kee-Choon; Lee, Dong-Young; Choi, Jong-Gyun

    2012-01-01

    In order to achieve technical self-reliance in the area of nuclear instrumentation and control, the Korea Nuclear Instrumentation and Control System (KNICS) project had been running for seven years from 2001. The safety-grade Programmable Logic Controller (PLC) and the digital safety system were developed by KNICS project. All the software of the PLC and digital safety system were developed and verified following the software development life cycle Verification and Validation (V and V) procedure. The main activities of the V and V process are preparation of software planning documentations, verification of the Software Requirement Specification (SRS), Software Design Specification (SDS) and codes, and a testing of the software components, the integrated software, and the integrated system. In addition, a software safety analysis and a software configuration management are included in the activities. For the software safety analysis at the SRS and SDS phases, the software Hazard Operability (HAZOP) was performed and then the software fault tree analysis was applied. The software fault tree analysis was applied to a part of software module with some critical defects identified by the software HAZOP in SDS phase. The software configuration management was performed using the in-house tool developed in the KNICS project. (author)

  14. MITI project on advanced man-machine system for nuclear power plants

    International Nuclear Information System (INIS)

    Kato, Kanji; Watanabe, Takao; Hayakawa, Hiroyasu; Naito, Norio; Masui, Takao; Ogino, Takamichi.

    1988-01-01

    A computerized operator support system (COSS) against abnormal plant conditions was developed as a five-year project from 1980 to 1984, under the sponsorship of the Ministry of International Trade and Industry. The main purpose of the COSS development was to implement the lessons learned from the Three Mile Island accident. The main nuclear industries in Japan participated in the project. The design concept of the operator support functions and the method to implement it were established, and the prototype systems of the COSS for BWR and PWR plants were developed. After the completion of the COSS development, the above participant group once again joined for the work on an advanced man-machine system for nuclear power plants (MMS-NPP). This eight-year project aims at realizing an advanced operator support system by applying artificial intelligence, especially knowledge engineering, and sophisticated man-machine interface devices. Its main objectives are shown. This system configuration, operating method decision system, man-machine communication system, operation and maintenance support functions and so on are described. (Kako, I.)

  15. Vis-NIR spectrometric determination of Brix and sucrose in sugar production samples using kernel partial least squares with interval selection based on the successive projections algorithm.

    Science.gov (United States)

    de Almeida, Valber Elias; de Araújo Gomes, Adriano; de Sousa Fernandes, David Douglas; Goicoechea, Héctor Casimiro; Galvão, Roberto Kawakami Harrop; Araújo, Mario Cesar Ugulino

    2018-05-01

    This paper proposes a new variable selection method for nonlinear multivariate calibration, combining the Successive Projections Algorithm for interval selection (iSPA) with the Kernel Partial Least Squares (Kernel-PLS) modelling technique. The proposed iSPA-Kernel-PLS algorithm is employed in a case study involving a Vis-NIR spectrometric dataset with complex nonlinear features. The analytical problem consists of determining Brix and sucrose content in samples from a sugar production system, on the basis of transflectance spectra. As compared to full-spectrum Kernel-PLS, the iSPA-Kernel-PLS models involve a smaller number of variables and display statistically significant superiority in terms of accuracy and/or bias in the predictions. Published by Elsevier B.V.

  16. Decisive management in selecting locations for development of construction projects

    Science.gov (United States)

    Szafranko, E.; Pawłowicz, J. A.

    2017-08-01

    The location of an investment project is one of the most important decisions in the construction and land development business. The shape of a new building and aspects of its future use depend on making a good choice of a land plot where it will be constructed. There are many characteristics involved descriptions of land available for development. On the one hand, different buildings (with different envisaged use) fit differently to a given location. Residential homes, for example, require a location which will ensure a peaceful lifestyle, with places for walks and recreation, situated in a relatively quite setting. On the other hand, close proximity to schools, shops or a health clinic is another important consideration. Industrial buildings should be localized so as not to be a nuisance to others, and their location should facilitate efficient transport of raw materials and ready products. Yet other requirements are defined for public buildings. It is therefore evident that the characteristics included in an evaluation of the location of a planned building can be highly diverse and their diversity makes the evaluation difficult. Selection of a location can be supported by a variety of methods. For instance, an evaluation can rely on assigning points which indicate the fulfillment of certain criteria. This approach generates a complex evaluation in the form of tables and maps of usefulness. Another possibility is to make an assessment of the criteria that a given land parcels should satisfy in order to develop a specific type of a building. Having combined these two sets of information, we can create a system or a model for the management of land resources, which will easily help to support decision making processes pertaining to the choice of a location. This article shows a model approach for a specific building.

  17. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    OpenAIRE

    Hudson, L. N.; Newbold, T.; Contu, S.; Hill, S. L.; Lysenko, I.; De Palma, A.; Phillips, H. R.; Alhusseini, T. I.; Bedford, F. E.; Bennett, D. J.; Booth, H.; Burton, V. J.; Chng, C. W.; Choimes, A.; Correia, D. L.

    2017-01-01

    The PREDICTS project-Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)-has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity of human impacts relating to land use. We have used this evidence base to develop global and regional statistical models of how local biodiversity responds to these measures. We describe and make free...

  18. Controlling general projective synchronization of fractional order Rossler systems

    International Nuclear Information System (INIS)

    Shao Shiquan

    2009-01-01

    This paper proposed a method to achieve general projective synchronization of two fractional order Rossler systems. First, we construct the fractional order Rossler system's corresponding approximation integer order system. Then, a control method based on a partially linear decomposition and negative feedback of state errors was utilized on the integer order system. Numerical simulations show the effectiveness of the proposed method.

  19. Pilot project of atomic energy technology record

    International Nuclear Information System (INIS)

    Song, K. C.; Kim, Y. I.; Kim, Y. G.

    2011-12-01

    Project of the Atomic Energy Technology Record is the project that summarizes and records in each category as a whole summary from the background to the performance at all fields of nuclear science technology which researched and developed at KAERI. This project includes Data and Document Management System(DDMS) that will be the system to collect, organize and preserve various records occurred in each research and development process. To achieve these goals, many problems should be solved to establish technology records process, such as issues about investigation status of technology records in KAERI, understanding and collection records, set-up project system and selection target field, definition standards and range of target records. This is a research report on the arrangement of research contents and results about pilot project which records whole nuclear technology researched and developed at KAERI in each category. Section 2 summarizes the overview of this pilot project and the current status of technology records in domestic and overseas, and from Section 3 to Section 6 summarize contents and results which performed in this project. Section 3 summarizes making TOC(Table of Content) and technology records, Section 4 summarizes sectoral templates, Section 5 summarizes writing detailed plan of technology records, and Section 6 summarizes Standard Document Numbering System(SDNS). Conclusions of this report are described in Section 7

  20. The Middle Eastern Regional Irrigation Management Information Systems project-update

    Science.gov (United States)

    The Middle Eastern Regional Irrigation Management Information Systems Project (MERIMIS) was formulated at a meeting of experts from the region in Jordan in 2003. Funded by the U.S. Department of State, it is a cooperative regional project bringing together participants from Israel, Jordan, Palestini...