WorldWideScience

Sample records for project scope involves

  1. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  2. Prioritising Project Scope Definition Elements in Public Building Projects

    Directory of Open Access Journals (Sweden)

    Mohammed K Fageha

    2014-09-01

    Full Text Available A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI as a basis, the study uses analytical network process (ANP technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage. Keywords: Project scope definition, pre-project planning, prioritising, public building projects, Saudi Arabia, Analytical Network Process (ANP

  3. IDC Reengineering Phase 2 Project Scope.

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-02-01

    This report provides a brief description of the scope of the IDC Reengineering Phase 2 project. It describes the goals and objectives of reengineering, the system definition, and the technical scope of the system. REVISIONS Version Date Author/Team Revision Description Authorized by 1.0 9/25/2014 SNL IDC Reengineering Team Unlimited Release for I2 M. Harris 1.1 28/01/2015 IDC Reengineering Team Align with previous IDC scope document E. Tomuta.

  4. 40 CFR 35.930-4 - Project scope.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Project scope. 35.930-4 Section 35.930... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.930-4 Project scope. The grant agreement must define the scope of the project for which Federal assistance is awarded...

  5. Fuzzy decision analysis for project scope change management

    OpenAIRE

    Farshad Shirazi; Hamed Kazemipoor; Reza Tavakkoli-Moghaddam

    2017-01-01

    It is very important to manage and control projects with the consideration of the triple constraints; namely time, cost and scope. It is also extremely important to manage the scope and all the procurements needed to complete any project. During the project’s lifecycle many changes take place, either positively or negatively, which should be controlled. If the changes are not controlled we may have scope creep that has negative effect on the project. It is commonly considered a negative incid...

  6. Fuzzy decision analysis for project scope change management

    Directory of Open Access Journals (Sweden)

    Farshad Shirazi

    2017-09-01

    Full Text Available It is very important to manage and control projects with the consideration of the triple constraints; namely time, cost and scope. It is also extremely important to manage the scope and all the procurements needed to complete any project. During the project’s lifecycle many changes take place, either positively or negatively, which should be controlled. If the changes are not controlled we may have scope creep that has negative effect on the project. It is commonly considered a negative incident, and thus, should be kept away from the project. By considering this concept, in this paper, we discuss scope change and managing scope and fuzzy analytical hierarchy process is used in selecting the best strategy to manage scope change in projects.

  7. Pre-contract project scoping processes : synthesis of practices.

    Science.gov (United States)

    2016-02-01

    Scoping is the process of developing a projects objectives, need, preliminary cost estimate, and preliminary schedule based on a : recognized need that the project is intended to address. This study (INDOT/JTRP SPR-3944) was launched by the Indian...

  8. Scoping study into community-based renewable energy projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    This scoping study has been carried out by the Centre for Sustainable Energy (CSE), a charity which promotes energy efficiency and renewable energy. CSE have used their involvement in the development of the Energy Club (the first energy service company for householders in the UK) and the Bristol Environment and Energy Trust (a cross-sector organisation initiating environmental projects) as the basis of the study. This study is the first phase of a long term project to set up two small-scale renewable energy schemes to demonstrate the benefits of a community based approach. Specific objectives of the study were: to identify, quantify and cost, renewable energy resources for interested community organisations; to evaluate two routes for developing community based projects - Environment Trusts and Energy Clubs'; to organise a seminar with the objective of bringing together community interest groups with experts in renewable energy; to identify two communities with viable renewable projects for the next phase - full feasibility studies/pilot projects. (author)

  9. Project scoping for lessons learnt to apply to the Celtic Seas marine sub-region

    OpenAIRE

    Twomey, Sarah; O'Mahony, Cathal

    2013-01-01

    This report involves a formal scoping exercise to identify lessons from a wide range of previous and current project and initiative experiences at the national, regional seas, European and global levels. An inventory of 77 projects and initiatives that are relevant with regard to the key activities proposed by the Celtic Seas Partnership has been compiled, as well as a short-list of 23 of the most pertinent projects, lessons learnt and contact names. This report has identified a number of syn...

  10. Tank farm restoration and safe operation, Project W-314, upgrade scope summary report (USSR)

    International Nuclear Information System (INIS)

    Gilbert, J.L.

    1998-01-01

    The revision to the Project W-314 Upgrade Scope Summary Report (USSR), incorporates changes to the project scope from customer guidance. Included are incorporation of the recommendations from HNF-2500, agreements regarding interfaces with Project W-211, and assumption of scope previously assigned to Project W-454

  11. Full scope upgrade project for the Fermi 2 simulator

    International Nuclear Information System (INIS)

    Bollacasa, D.; Gonsalves, J.B.; Newcomb, P.C.

    1994-01-01

    The Detroit Edison company (DECO) concentrated the Simulation Division of Asea Brown Boveri (ABB) to perform a full scope upgrade of the Fermi 2 simulator. The Fermi 2 plant is a BWR 6 generation Nuclear Steam Supply System (NSSS). The project included the complete replacement of the existing simulation model sofware with ABB's high fidelity BWR models, addition of an advanced instructor station facility and new simulation computers. Also provided on the project were ABB's advanced simulation environment (CETRAN), a comprehensive configuration management system based on a modern relational database system and a new computer interface to the input/output system. (8 refs., 2 figs.)

  12. Angra 1 nuclear power plant full scope simulator development project

    Energy Technology Data Exchange (ETDEWEB)

    Selvatici, Edmundo; Castanheira, Luiz Carlos C.; Silva Junior, Nilo Garcia da, E-mail: edsel@eletronuclear.gov.br, E-mail: lccast@eletronuclear.gov.br, E-mail: nilogar@eletronuclear.gov.br [Eletrobras Termonuclear S.A. (SCO/ELETRONUCLEAR), Angra dos Reis, RJ (Brazil). Superintendencia de Coordenacao da Operacao; Zazo, Francisco Javier Lopez; Ruiz, Jose Antonio, E-mail: jlopez@tecnatom.es, E-mail: jaruiz@tecnatom.es [Tecnatom S.A., San Sebastian de los Reyes, Madrid (Spain)

    2015-07-01

    Specific Full Scope Simulators are an essential tool for training NPP control room operators, in the formation phase as well as for maintaining their qualifications. In the last years availability of a Plant specific simulator has also become a Regulator requirement for Nuclear Power Plant operation. By providing real-time practical training for the operators, the use of a simulator allows improving the operator's performance, reducing the number of unplanned shutdowns and more effective response to abnormal and emergency operating conditions. It can also be used, among other uses, to validate procedures, test proposed plant modifications, perform engineering studies and to provide operation training for the technical support staff of the plant. The NPP site, in Angra dos Reis-RJ, Brazil, comprises the two units in operation, Unit 1, 640 MWe, Westinghouse PWR and Unit 2, 1350 MWe, KWU/Areva PWR and one unit in construction, Unit 3, 1405 MWe, KWU/Areva PWR, of the same design of Angra 2. Angra 2 has had its full scope simulator from the beginning, however this was not the case of Angra 1, that had to train its operators abroad, due to lack of a specific simulator. Eletronuclear participated in all the phases of the project, from data supply to commissioning and validation. The Angra 1 full scope simulator encompasses more than 80 systems of the plant including the Primary system, reactor core and associated auxiliary systems, the secondary system and turbo generator as well as all the Plant operational and safety I and C. The Angra 1 Main Control Room panels were reproduced in the simulator control room as well as the remote shutdown panels that are outside the control room. This paper describes the project for development of the Angra 1 NPP Full Scope Simulator, supplied by Tecnatom S.A., in the period of Feb.2012 to Feb.2015. (author)

  13. Angra 1 nuclear power plant full scope simulator development project

    International Nuclear Information System (INIS)

    Selvatici, Edmundo; Castanheira, Luiz Carlos C.; Silva Junior, Nilo Garcia da

    2015-01-01

    Specific Full Scope Simulators are an essential tool for training NPP control room operators, in the formation phase as well as for maintaining their qualifications. In the last years availability of a Plant specific simulator has also become a Regulator requirement for Nuclear Power Plant operation. By providing real-time practical training for the operators, the use of a simulator allows improving the operator's performance, reducing the number of unplanned shutdowns and more effective response to abnormal and emergency operating conditions. It can also be used, among other uses, to validate procedures, test proposed plant modifications, perform engineering studies and to provide operation training for the technical support staff of the plant. The NPP site, in Angra dos Reis-RJ, Brazil, comprises the two units in operation, Unit 1, 640 MWe, Westinghouse PWR and Unit 2, 1350 MWe, KWU/Areva PWR and one unit in construction, Unit 3, 1405 MWe, KWU/Areva PWR, of the same design of Angra 2. Angra 2 has had its full scope simulator from the beginning, however this was not the case of Angra 1, that had to train its operators abroad, due to lack of a specific simulator. Eletronuclear participated in all the phases of the project, from data supply to commissioning and validation. The Angra 1 full scope simulator encompasses more than 80 systems of the plant including the Primary system, reactor core and associated auxiliary systems, the secondary system and turbo generator as well as all the Plant operational and safety I and C. The Angra 1 Main Control Room panels were reproduced in the simulator control room as well as the remote shutdown panels that are outside the control room. This paper describes the project for development of the Angra 1 NPP Full Scope Simulator, supplied by Tecnatom S.A., in the period of Feb.2012 to Feb.2015. (author)

  14. Tank farm restoration and safe operation, project W-314, upgrade scope summary report (USSR)

    International Nuclear Information System (INIS)

    Jacobson, R.W.

    1997-01-01

    This revision to the Project W-314 Upgrade Scope Summary Report (USSR), incorporates changes to the project scope from Alternative Generation Analysis (AGA), customer guidance, and changing requirements. It defines the actual upgrades currently in scope, and provides traceability to the requirements and/or drivers

  15. Great auricular nerve involvement in leprosy: Scope for misdiagnosis

    Directory of Open Access Journals (Sweden)

    Ramesh V

    2007-01-01

    Full Text Available Three patients with neuritis of the great auricular nerve (GAN have been reported. Two patients seen by physicians and an otolaryngologist had prominent and tender cord along the neck with facial edema and history of fainting attack in one, and erythema and hyperaesthesia of the ear in the other simulating vascular occlusion, which were confirmed to be leprosy in Type 1 reaction by the dermatologist. In the third, cold abscess in the nerve that had persisted after anti-leprosy treatment was mistaken as tuberculous cervical lymphadenitis by a surgeon since aspiration had revealed acid-fast bacilli. The probable reasons for misdiagnosis include rarity of involvement of the GAN and its proximity to main blood vessels, and the need for careful interpretation of laboratory results.

  16. Brief introduction to project management of full scope simulator for Qinshan 300 MW Nuclear Power Unit

    International Nuclear Information System (INIS)

    Chen Jie

    1996-01-01

    The key points in development and engineering project management of full scope simulator for Qinshan 300 MW Nuclear Power Unit are briefly introduced. The Gantt chart, some project management methods and experience are presented. The key points analysis along with the project procedure will be useful to the similar project

  17. Draft Executive Summary Hawaii Geothermal Project - EIS Scoping Meetings

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-03-01

    After introductions by the facilitator and the program director from DOE, process questions were entertained. It was also sometimes necessary to make clarifications as to process throughout the meetings. Topics covered federal involvement in the HGP-EIS; NEPA compliance; public awareness, review, and access to information; Native Hawaiian concerns; the record of decision, responsibility with respect to international issues; the impacts of prior and on-going geothermal development activities; project definition; alternatives to the proposed action; necessary studies; Section 7 consultations; socioeconomic impacts; and risk analysis. Presentations followed, in ten meetings, 163 people presented issues and concerns, 1 additional person raised process questions only.

  18. Hanford Waste Vitrification Project Building limited scope risk assessment

    International Nuclear Information System (INIS)

    Braun, D.J.; Lindberg, S.E.; Reardon, M.F.; Wilson, G.P.

    1992-10-01

    A limited scope risk assessment was performed on the preliminary design of a high-level waste interim storage facility. The Canister Storage Building (CSB) facility will be built to support remediation at the US Department of Energy Hanford Site in Washington State. The CSB will be part of the support facilities for a high level Hanford Waste Vitrification Plant (HWVP). The limited scope risk assessment is based on a preliminary design which uses forced air circulation systems to move air through the building vault. The current building design calls for natural circulation to move air through the building vault

  19. Puget Sound Reinforcement Project : Planning for Peak Power Needs : Scoping Report, Part A, Summary of Public Comments.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1990-07-01

    This report summarizes public participation in the environmental scoping process for the Puget Sound Reinforcement Project, a Bonneville Power Administration (BPA) and Puget Sound area utilities study of voltage stability in northwestern Washington state. The environmental scoping phase of the Puget Sound project consisted of a series of public meetings and a public comment period. The content of these meetings is summarized in 2.0, Public Involvement. In 3.0, Comment Summary, the report summarizes comments received via meetings, mail and phone. The report ends with a description of the next steps in the project. Chapter 4.0, describes the decision process to be used by BPA and area utilities. Chapter 5.0 describes opportunities for public participation in decisions to be made about the future reliability of Puget Sound's electricity supply.

  20. Interdisciplinary Collaboration: Librarian Involvement in Grant Projects

    Science.gov (United States)

    Brandenburg, Marci D.; Cordell, Sigrid Anderson; Joque, Justin; MacEachern, Mark P.; Song, Jean

    2017-01-01

    Librarians are excellent research collaborators, although librarian participation is not usually considered, thereby making access to research funds difficult. The University of Michigan Library became involved in the university's novel funding program, MCubed, which supported innovative interdisciplinary research on campus, primarily by funding…

  1. What do we know about Canadian involvement in medical tourism?: a scoping review.

    Science.gov (United States)

    Snyder, Jeremy; Crooks, Valorie A; Johnston, Rory; Kingsbury, Paul

    2011-01-01

    Medical tourism, the intentional pursuit of elective medical treatments in foreign countries, is a rapidly growing global industry. Canadians are among those crossing international borders to seek out privately purchased medical care. Given Canada's universally accessible, single-payer domestic health care system, important implications emerge from Canadians' private engagement in medical tourism. A scoping review was conducted of the popular, academic, and business literature to synthesize what is currently known about Canadian involvement in medical tourism. Of the 348 sources that were reviewed either partly or in full, 113 were ultimately included in the review. The review demonstrates that there is an extreme paucity of academic, empirical literature examining medical tourism in general or the Canadian context more specifically. Canadians are engaged with the medical tourism industry not just as patients but also as investors and business people. There have been a limited number of instances of Canadians having their medical tourism expenses reimbursed by the public medicare system. Wait times are by far the most heavily cited driver of Canadians' involvement in medical tourism. However, despite its treatment as fact, there is no empirical research to support or contradict this point. Although medical tourism is often discussed in the Canadian context, a paucity of data on this practice complicates our understanding of its scope and impact.

  2. What do we know about Canadian involvement in medical tourism? A scoping review

    Science.gov (United States)

    Snyder, Jeremy; Crooks, Valorie A; Johnston, Rory; Kingsbury, Paul

    2011-01-01

    Background Medical tourism, the intentional pursuit of elective medical treatments in foreign countries, is a rapidly growing global industry. Canadians are among those crossing international borders to seek out privately purchased medical care. Given Canada’s universally accessible, single-payer domestic health care system, important implications emerge from Canadians’ private engagement in medical tourism. Methods A scoping review was conducted of the popular, academic, and business literature to synthesize what is currently known about Canadian involvement in medical tourism. Of the 348 sources that were reviewed either partly or in full, 113 were ultimately included in the review. Results The review demonstrates that there is an extreme paucity of academic, empirical literature examining medical tourism in general or the Canadian context more specifically. Canadians are engaged with the medical tourism industry not just as patients but also as investors and business people. There have been a limited number of instances of Canadians having their medical tourism expenses reimbursed by the public medicare system. Wait times are by far the most heavily cited driver of Canadians’ involvement in medical tourism. However, despite its treatment as fact, there is no empirical research to support or contradict this point. Discussion Although medical tourism is often discussed in the Canadian context, a paucity of data on this practice complicates our understanding of its scope and impact. PMID:22046228

  3. Involvement of older people in the development of fall detection systems: a scoping review.

    Science.gov (United States)

    Thilo, Friederike J S; Hürlimann, Barbara; Hahn, Sabine; Bilger, Selina; Schols, Jos M G A; Halfens, Ruud J G

    2016-02-11

    The involvement of users is recommended in the development of health related technologies, in order to address their needs and preferences and to improve the daily usage of these technologies. The objective of this literature review was to identify the nature and extent of research involving older people in the development of fall detection systems. A scoping review according to the framework of Arksey and O'Malley was carried out. A key term search was employed in eight relevant databases. Included articles were summarized using a predetermined charting form and subsequently thematically analysed. A total of 53 articles was included. In 49 of the 53 articles, older people were involved in the design and/or testing stages, and in 4 of 53 articles, they were involved in the conceptual or market deployment stages. In 38 of the 53 articles, the main focus of the involvement of older people was technical aspects. In 15 of the 53 articles, the perspectives of the elderly related to the fall detection system under development were determined using focus groups, single interviews or questionnaires. Until presently, involvement of older people in the development of fall detection systems has focused mainly on technical aspects. Little attention has been given to the specific needs and views of older people in the context of fall detection system development and usage.

  4. IPMA Standard Competence Scope in Project Management Education

    Science.gov (United States)

    Bartoška, Jan; Flégl, Martin; Jarkovská, Martina

    2012-01-01

    The authors of the paper endeavoured to find out key competences in IPMA standard for educational approaches in project management. These key competences may be used as a basis for project management university courses. An incidence matrix was set up, containing relations between IPMA competences described in IPMA competence baseline. Further,…

  5. Homeless Education Project 1996-97. Scope of Program.

    Science.gov (United States)

    West Contra Costa Unified School District, CA.

    The documents in this collection relate to the Homeless Education Project conducted in the elementary and secondary schools of the West Contra Costa Unified School District (California). The first document is a chart describing the project and its main goals: (1) an accelerated curriculum in reading and mathematics; (2) effective procedures for…

  6. Lay and professional stakeholder involvement in scoping palliative care issues: Methods used in seven European countries.

    Science.gov (United States)

    Brereton, Louise; Ingleton, Christine; Gardiner, Clare; Goyder, Elizabeth; Mozygemba, Kati; Lysdahl, Kristin Bakke; Tummers, Marcia; Sacchini, Dario; Leppert, Wojciech; Blaževičienė, Aurelija; van der Wilt, Gert Jan; Refolo, Pietro; De Nicola, Martina; Chilcott, James; Oortwijn, Wija

    2017-02-01

    Stakeholders are people with an interest in a topic. Internationally, stakeholder involvement in palliative care research and health technology assessment requires development. Stakeholder involvement adds value throughout research (from prioritising topics to disseminating findings). Philosophies and understandings about the best ways to involve stakeholders in research differ internationally. Stakeholder involvement took place in seven countries (England, Germany, Italy, Lithuania, the Netherlands, Norway and Poland). Findings informed a project that developed concepts and methods for health technology assessment and applied these to evaluate models of palliative care service delivery. To report on stakeholder involvement in the INTEGRATE-HTA project and how issues identified informed project development. Using stakeholder consultation or a qualitative research design, as appropriate locally, stakeholders in seven countries acted as 'advisors' to aid researchers' decision making. Thematic analysis was used to identify key issues across countries. A total of 132 stakeholders (82 professionals and 50 'lay' people) aged ⩾18 participated in individual face-to-face or telephone interviews, consultation meetings or focus groups. Different stakeholder involvement methods were used successfully to identify key issues in palliative care. A total of 23 issues common to three or more countries informed decisions about the intervention and comparator of interest, sub questions and specific assessments within the health technology assessment. Stakeholders, including patients and families undergoing palliative care, can inform project decision making using various involvement methods according to the local context. Researchers should consider local understandings about stakeholder involvement as views of appropriate and feasible methods vary. Methods for stakeholder involvement, especially consultation, need further development.

  7. Patient and public involvement in scope development for a palliative care health technology assessment in europe

    NARCIS (Netherlands)

    Brereton, L.; Goyder, E.; Ingleton, C.; Gardiner, C.; Chilcott, J.; Wilt, G.J. van der; Oortwijn, W.; Mozygemba, K.; Lysdahl, K.B.; Sacchini, D.; Lepper, W.

    2014-01-01

    BACKGROUND: Patient and Public Involvement (PPI) helps to ensure that study findings are useful to end users but is under-developed in Health Technology Assessment (HTA). "INTEGRATE-HTA, (a co-funded European Union project -grant agreement 30614) is developing new methods to assess complex health

  8. Scoping a Product Configuration Project for Engineer-to-Order Companies

    DEFF Research Database (Denmark)

    Shafiee, Sara; Hvam, Lars; Bonev, Martin

    2014-01-01

    When implementing a product configuration system in a company making complex and highly engineered products, many decisions need to be made in the early phases of the project. This article presents a framework for supporting the initial scoping process and discusses experiences from applying...

  9. Determining Teachers' Educational Needs Regarding School Education Projects within the Scope of Erasmus+ Programme

    Science.gov (United States)

    Karakus, Fatma; Uyar, Melis Yesilpinar; Balbag, Nur Leman

    2017-01-01

    The purpose of this study was to determine teachers' educational needs regarding school education projects within the scope of Erasmus+ programme. In the study, the case study method, one of qualitative research designs, was used. The participants were determined using the snowball sampling method, and eight secondary school teachers took part in…

  10. Scoping session of the programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    1992-01-01

    This document is about the scoping session which was held at the Community Center in Falls City, Texas. The purpose was to obtain public comment on the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Project (UMTRA), specifically on the ground water project. Presentations made by the manager for the entire UMTRA program, manager of the site and ground water program, comments made by two residents of Fall City are included in this document

  11. Scoping session of the programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Project

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-12-31

    This document is about the scoping session which was held at the Community Center in Falls City, Texas. The purpose was to obtain public comment on the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Project (UMTRA), specifically on the ground water project. Presentations made by the manager for the entire UMTRA program, manager of the site and ground water program, comments made by two residents of Fall City are included in this document.

  12. 40 CFR 93.125 - Enforceability of design concept and scope and project-level mitigation and control measures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Enforceability of design concept and... Transit Laws § 93.125 Enforceability of design concept and scope and project-level mitigation and control... determinations for a transportation plan or TIP and are included in the project design concept and scope which is...

  13. The HCV Synthesis Project: Scope, methodology, and preliminary results

    Directory of Open Access Journals (Sweden)

    Scheinmann Roberta

    2008-09-01

    Full Text Available Abstract Background The hepatitis C virus (HCV is hyper-endemic in injecting drug users. There is also excess HCV among non-injection drug users who smoke, snort, or sniff heroin, cocaine, crack, or methamphetamine. Methods To summarize the research literature on HCV in drug users and identify gaps in knowledge, we conducted a synthesis of the relevant research carried out between 1989 and 2006. Using rigorous search methods, we identified and extracted data from published and unpublished reports of HCV among drug users. We designed a quality assurance system to ensure accuracy and consistency in all phases of the project. We also created a set of items to assess study design quality in each of the reports we included. Results We identified 629 reports containing HCV prevalence rates, incidence rates and/or genotype distribution among injecting or non-injecting drug user populations published between January 1989 and December 2006. The majority of reports were from Western Europe (41%, North America (26%, Asia (11% and Australia/New Zealand (10%. We also identified reports from Eastern Europe, South America, the Middle East, and the Caribbean. The number of publications reporting HCV rates in drug users increased dramatically between 1989 and 2006 to 27–52 reports per year after 1998. Conclusion The data collection and quality assurance phases of the HCV Synthesis Project have been completed. Recommendations for future research on HCV in drug users have come out of our data collection phase. Future research reports can enhance their contributions to our understanding of HCV etiology by clearly defining their drug user participants with respect to type of drug and route of administration. Further, the use of standard reporting methods for risk factors would enable data to be combined across a larger set of studies; this is especially important for HCV seroconversion studies which suffer from small sample sizes and low power to examine risk

  14. How to Scope a Product Configuration Project in an Engineering Company

    DEFF Research Database (Denmark)

    Shafiee, Sara; Hvam, Lars; Bonev, Martin

    2014-01-01

    When implementing a product configuration system in a company making complex and highly engineered products, many decisions need to be made in the early phases of the project. This article presents a framework for supporting the initial scoping process and discusses experiences from applying...... the framework in an engineering company. The framework covers a number of topics, such as identifying the users of the configuration system, prioritizing the user requirements, defining the input and output, and the overall functionality of the configuration system. Furthermore, the scoping process considers...

  15. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  16. 75 FR 11169 - Reedsport OPT Wave Park Project; Reedsport OPT Wave Park; LLC Notice of Scoping Meetings and...

    Science.gov (United States)

    2010-03-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12713-002] Reedsport OPT Wave Park Project; Reedsport OPT Wave Park; LLC Notice of Scoping Meetings and Environmental Site...: Reedsport OPT Wave Park, LLC. e. Name of Project: Reedsport OPT Wave Park Project. [[Page 11170

  17. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 2: Public Involvement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the public involvement process is the Comment Report which follows in part of this volume on Public Involvement.

  18. Comprehensive Summary and Analysis of Oral and Written Scoping Comments on the Hawaii Geothermal Project EIS (DOE Review Draft)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-09-18

    This report contains summaries of the oral and written comments received during the scoping process for the Hawaii Geothermal Project (HGP) Environmental Impact Statement (EIS). Oral comments were presented during public scoping meetings; written comments were solicited at the public scoping meetings and in the ''Advance Notice of Intent'' and ''Notice of Intent'' (published in the ''Federal Register'') to prepare the HGP EIS. This comprehensive summary of scoping inputs provides an overview of the issues that have been suggested for inclusion in the HGP EIS.

  19. Ten Projects to Involve Your Students Directly in French.

    Science.gov (United States)

    van Lent, Peter C.

    1981-01-01

    Proposes 10 activities to provide French classes of all levels with a broad spectrum of language projects involving direct and active use of French including students polling each other, skits based on television commercials, geographical "show and tell," cooking French dishes, writing a monthly newspaper, and field trips. (BK)

  20. What do we know about Canadian involvement in medical tourism? A scoping review

    OpenAIRE

    Snyder, Jeremy; Crooks, Valorie A; Johnston, Rory; Kingsbury, Paul

    2011-01-01

    Background: Medical tourism, the intentional pursuit of elective medical treatments in foreign countries, is a rapidly growing global industry. Canadians are among those crossing international borders to seek out privately purchased medical care. Given Canada’s universally accessible, single-payer domestic health care system, important implications emerge from Canadians’ private engagement in medical tourism. Methods: A scoping review was conducted of the popular, academic, and business li...

  1. Lay and professional stakeholder involvement in scoping palliative care issues: Methods used in seven European countries

    NARCIS (Netherlands)

    Brereton, L.; Ingleton, C.; Gardiner, C.; Goyder, E.; Mozygemba, K.; Lysdahl, K.B.; Tummers, M.J.; Sacchini, D.; Leppert, W.; Blazeviciene, A.; Wilt, G.J. van der; Refolo, P.; Nicola, M. De; Chilcott, J.; Oortwijn, W.

    2017-01-01

    BACKGROUND: Stakeholders are people with an interest in a topic. Internationally, stakeholder involvement in palliative care research and health technology assessment requires development. Stakeholder involvement adds value throughout research (from prioritising topics to disseminating findings).

  2. Communication and Stakeholder Involvement in Environmental Remediation Projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-05-15

    The way in which members of the public perceive a contamination situation and an approach to the remediation of contaminated land will influence the decision making process in a variety of ways. Through communication between experts, decision makers and members of stakeholder communities, participatory processes and negotiation between different interest groups can sometimes be used effectively as mechanisms for improving the overall decision making process. The intention is to ensure a technically sound and socially acceptable decision that meets norms of adequacy or satisfactory performance in relation to a whole range of different concerns. Good communication strategies will encourage cooperation and understanding between different interested parties in remediation projects. Involvement of affected or interested persons can prevent fear driven reactions, which potentially damage public response and create undue expectations or unnecessary anxiety. For all environmental remediation (ER) cases, there is a risk that the process will fail if it does not respect social, environmental, political and economic dimensions. This requires open, clear and mutually agreed lines of communication among stakeholders within a well defined legal framework. A general recommendation is to involve them from a very early point in the process. This publication presents ER in plain language in such a way that implementers and regulators can communicate the motives and objectives of remediation projects to a variety of stakeholder communities in order to improve mutual understanding and facilitate dialogue between interested parties. ER is considered from two perspectives: technical and non-technical. A section that gives general ideas on the strategies to deal with stakeholder involvement and which discusses different aspects of the communication approaches in ER is then included. It is recognized that social, cultural and political situations are very diverse in different countries in

  3. Communication and Stakeholder Involvement in Environmental Remediation Projects

    International Nuclear Information System (INIS)

    2014-01-01

    The way in which members of the public perceive a contamination situation and an approach to the remediation of contaminated land will influence the decision making process in a variety of ways. Through communication between experts, decision makers and members of stakeholder communities, participatory processes and negotiation between different interest groups can sometimes be used effectively as mechanisms for improving the overall decision making process. The intention is to ensure a technically sound and socially acceptable decision that meets norms of adequacy or satisfactory performance in relation to a whole range of different concerns. Good communication strategies will encourage cooperation and understanding between different interested parties in remediation projects. Involvement of affected or interested persons can prevent fear driven reactions, which potentially damage public response and create undue expectations or unnecessary anxiety. For all environmental remediation (ER) cases, there is a risk that the process will fail if it does not respect social, environmental, political and economic dimensions. This requires open, clear and mutually agreed lines of communication among stakeholders within a well defined legal framework. A general recommendation is to involve them from a very early point in the process. This publication presents ER in plain language in such a way that implementers and regulators can communicate the motives and objectives of remediation projects to a variety of stakeholder communities in order to improve mutual understanding and facilitate dialogue between interested parties. ER is considered from two perspectives: technical and non-technical. A section that gives general ideas on the strategies to deal with stakeholder involvement and which discusses different aspects of the communication approaches in ER is then included. It is recognized that social, cultural and political situations are very diverse in different countries in

  4. Scoping key soil issues for the Suncor Voyageur Oil Sands Project EIA

    Energy Technology Data Exchange (ETDEWEB)

    Doram, D.; Gulley, J. [Golder Associates, Calgary, AB (Canada); Fordham, C. [Suncor Energy, Calgary, AB (Canada)

    2002-07-01

    An issue scoping process to focus the soil impact assessment undertaken in conjunction with Suncor Energy's Voyageur Project near Fort McMurray, Alberta, is described. Potential impacts to soils considered include disturbances from mining and in-situ developments, re-constructing soils to meet equivalent capability and predicting how soils will respond to acid deposition. The assessment also provides an opportunity to evaluate unique soil mitigation strategies at both the local and regional levels. New regulatory and soil reclamation challenges include developing soil salvage criteria for restoring the biodiversity which existed prior to the disturbance necessitated by the mining and in-situ operations and creating a suitable habitat for the caribou in the Firebag lease.

  5. Developing Federated Services within Seismology: IRIS' involvement in the CoopEUS Project

    Science.gov (United States)

    Ahern, T. K.; Trabant, C. M.; Stults, M.

    2014-12-01

    As a founding member of the CoopEUS initiative, IRIS Data Services has partnered with five data centers in Europe and the UC Berkeley (NCEDC) in the US to implement internationally standardized web services to access seismological data using identical methodologies. The International Federation of Digital Seismograph Networks (FDSN) holds commission status within IASPEI/IUGG and as such is the international body that governs data exchange formats and access protocols within seismology. The CoopEUS project involves IRIS and UNAVCO as part of the EarthScope project and the European collaborators are all members of the European Plate Observing System (EPOS). CoopEUS includes one work package that attempts to coordinate data access between EarthScope and EPOS facilities. IRIS has worked with its partners in the FDSN to develop and adopt three key international service standards within seismology. These include 1) fdsn-dataselect, a service that returns time series data in a variety of standard formats, 2) fdsn-station, a service that returns related metadata about a seismic station in stationXML format, and 3) fdsn-event, a service that returns information about earthquakes and other seismic events in QuakeML format. Currently the 5 European data centers supporting these services include the ORFEUS Data Centre in the Netherlands, the GFZ German Research Centre for Geosciences in Potsdam, Germany, ETH Zurich in Switzerland, INGV in Rome, Italy, and the RESIF Data Centre in Grenoble France. Presently these seven centres can all be accessed using standardized web services with identical service calls and returns results in standardized ways. IRIS is developing an IRIS federator that will allow a client to seamlessly access information across the federated centers. Details and current status of the IRIS Federator will be presented.

  6. Ethics challenges and guidance related to research involving adolescent post-abortion care: a scoping review.

    Science.gov (United States)

    Zulu, Joseph M; Ali, Joseph; Hallez, Kristina; Kass, Nancy; Michelo, Charles; Hyder, Adnan A

    2018-05-02

    An increase in post abortion care (PAC) research with adolescents, particularly in low- and middle-income countries, has brought to attention several associated research ethics challenges. In order to better understand the ethics context of PAC research with adolescents, we conducted a scoping review of published literature. Following a systematic search of PubMed, HINARI, and Google Scholar, we analysed articles meeting inclusion criteria to determine common themes across both the ethical challenges related to PAC research with adolescents and any available guidance on the identified challenges. The literature search identified an initial 3321 records of which 14 were included in analysis following screening. Several ethical challenges stem from abortion being a controversial, sensitive, and stigmatized topic in many settings. Ethical dilemmas experienced by researchers conducting adolescent PAC research included: difficulties in convincing local health providers to permit PAC research; challenges in recruiting and seeking consent due to sensitivity of the subject; effectively protecting confidentiality; managing negative effects of interventions; creating a non-prejudicial atmosphere for research; managing emotional issues among adolescents; and dealing with uncertainty regarding the role of researchers when observing unethical health care practices. Suggested strategies for addressing some of these challenges include: using several sources to recruit study participants, using research to facilitate dialogue on abortion, briefing health workers on any observed unethical practices after data collection, fostering a comprehensive understanding of contextual norms and values, selecting staff with experience working with study populations, and avoiding collection of personal identifiers. Addressing ethical challenges that researchers face when conducting PAC research with adolescents requires guidance at the individual, institutional, community, and international

  7. Trillo NPP full scope replica simulator project: The last great NPP simulation challenge in Spain

    International Nuclear Information System (INIS)

    Rivero, N.; Abascal, A.

    2006-01-01

    In the year 2000, Trillo NPP (Spanish PWR-KWU design nuclear power plant) and Tecnatom came to the agreement of developing a Trillo plant specific simulator, having as scope all the plant systems operated either from the main control room or from the emergency panels. The simulator operation should be carried out both through a control room replica and graphical user interface, this latter based on plant schematics and softpanels concept. Trillo simulator is to be primarily utilized as a pedagogical tool for the Trillo operational staff training. Because the engineering grade of the mathematical models, it will also have additional uses, such as: - Operation engineering (POE's validation, New Computerized Operator Support Systems Validation, etc).; - Emergency drills; -Plant design modifications assessment. This project has become the largest simulation task Tecnatom has ever undertaken, being structured in three different subprojects, namely: - Simulator manufacture, Simulator acceptance and Training material production. Most relevant technological innovations the project brings are: Highest accuracy in the Nuclear Island models, Advanced Configuration Management System, Open Software architecture, Human machine interface new design, Latest design I/O system and an Instructor Station with extended functionality. The Trillo simulator 'Ready for Training' event is due on September 2003, having started the Factory Acceptance Tests in Autumn 2002. (author)

  8. Involving patients in patient safety programmes: A scoping review and consensus procedure by the LINNEAUS collaboration on patient safety in primary care

    NARCIS (Netherlands)

    Trier, H.; Valderas, J.M.; Wensing, M.; Martin, H.M.; Egebart, J.

    2015-01-01

    BACKGROUND: Patient involvement has only recently received attention as a potentially useful approach to patient safety in primary care. OBJECTIVE: To summarize work conducted on a scoping review of interventions focussing on patient involvement for patient safety; to develop consensus-based

  9. The Use of Tablets Distributed within the Scope of FATIH Project for Education in Turkey (Is FATIH Project a Fiasco or a Technological Revolution?)

    Science.gov (United States)

    Isci, Tugce Gamze; Demir, Selcuk Besir

    2015-01-01

    This study aims to profoundly investigate the usage of tablets distributed within the scope of FATIH Project in Turkey in terms of teacher views. The study was conducted with case study design, which is one of the qualitative study methods. The participants in the study were determined using critical case sampling. Data was collected using…

  10. Projecting Fatalities in Crashes Involving Older Drivers, 2000-2025

    Energy Technology Data Exchange (ETDEWEB)

    Hu, P.S.

    2001-03-23

    As part of this research effort, we developed a new methodology for projecting elderly traffic crash fatalities. This methodology separates exposure to crashes from crash risk per se, and further divides exposure into two components, the number of miles driven and the likelihood of being a driver. This component structure permits conceptually different determinants of traffic fatalities to be projected separately and has thorough motivation in behavioral theory. It also permits finer targeting of particular aspects of projections that need improvement and closer linking of projections to possible policy instruments for influencing them.

  11. Hydrological and geological preliminary studies in the scope of the RMB project

    International Nuclear Information System (INIS)

    Ferreira, Vinicius V.M.; Barreto, Alberto A.; Aleixo, Bruna L.

    2011-01-01

    The RMB - Brazilian Multipurpose Reactor is a project that will contribute decisively in order to develop the science and the technology of the country. However, the licensing process of this facility is not a simple task, since it involves nuclear and environmental questions. The utilization of geoprocessing tools became in the last years an important technique to aid the development of several studies, and will be necessary also in this project. The objective of this work is to present the first hydrological and geological geoprocessing studies done in order to support the future environmental licensing process of the facility. The results show that further efforts should be done since there is a lack of many data needed for the next steps. (author)

  12. Particulate Air Contamination in Puerto Rico: A Student Involvement Project.

    Science.gov (United States)

    Eckert, Richard R.

    1979-01-01

    Describes a research project undertaken by physics undergraduate students to monitor particulate air contamination in Ponce, Puerto Rico, and to determine the meteorological factors which contribute to it. (GA)

  13. Contribution of Full-Scope Simulator Development Project to the Dissemination of Nuclear Knowledge within New-Build–Project Teams

    International Nuclear Information System (INIS)

    Gain, P.

    2016-01-01

    Full text: In a context where few countries recently carried out nuclear new-build projects combined with very strong need for generation renewal, there exists a major stake for the training of the hundreds of engineers who are involved in the design and commissioning teams of this highly complex industrial facility. The Simulator project, which gives the first opportunity for integration and validation of the whole of the design data, to check their coherence, the good performance with the interface and conformity with the safety and performance requirements, allows a fast and effective competence rise of all the resources involved in its development. In addition, the phased availability of the whole of data generally results in having several phased versions of the simulator. Each can then be deployed in great number for training drills which also will contribute to share in optimal way knowledge on the reference plant design. This contexts of broader use of these training modules and use of simulation in support of the engineering activities lead to their use by many teams with varied profiles; and there too, the simulation technologies are of a remarkable effectiveness to share a common and stable knowledge management. (author

  14. South African programme for the SCOPE project on the ecology of biological invasions

    CSIR Research Space (South Africa)

    Ferrar, AA

    1983-07-01

    Full Text Available A description of the aims of the international SCOPE programme on biological invasions is provided, together with a proposed four year time table of international activities. This is followed by a brief account of the history, organization...

  15. Involving patients in patient safety programmes: A scoping review and consensus procedure by the LINNEAUS collaboration on patient safety in primary care.

    Science.gov (United States)

    Trier, Hans; Valderas, Jose M; Wensing, Michel; Martin, Helle Max; Egebart, Jonas

    2015-09-01

    Patient involvement has only recently received attention as a potentially useful approach to patient safety in primary care. To summarize work conducted on a scoping review of interventions focussing on patient involvement for patient safety; to develop consensus-based recommendations in this area. Scoping review of the literature 2006-2011 about methods and effects of involving patients in patient safety in primary care identified evidence for previous experiences of patient involvement in patient safety. This information was fed back to an expert panel for the development of recommendations for healthcare professionals and policy makers. The scoping review identified only weak evidence in support of the effectiveness of patient involvement. Identified barriers included a number of patient factors but also the healthcare workers' attitudes, abilities and lack of training. The expert panel recommended the integration of patient safety in the educational curricula for healthcare professionals, and expected a commitment from professionals to act as first movers by inviting and encouraging the patients to take an active role. The panel proposed a checklist to be used by primary care clinicians at the point of care for promoting patient involvement. There is only weak evidence on the effectiveness of patient involvement in patient safety. The recommendations of the panel can inform future policy and practice on patient involvement in safety in primary care.

  16. Public involvement in multi-objective water level regulation development projects-evaluating the applicability of public involvement methods

    International Nuclear Information System (INIS)

    Vaentaenen, Ari; Marttunen, Mika

    2005-01-01

    Public involvement is a process that involves the public in the decision making of an organization, for example a municipality or a corporation. It has developed into a widely accepted and recommended policy in environment altering projects. The EU Water Framework Directive (WFD) took force in 2000 and stresses the importance of public involvement in composing river basin management plans. Therefore, the need to develop public involvement methods for different situations and circumstances is evident. This paper describes how various public involvement methods have been applied in a development project involving the most heavily regulated lake in Finland. The objective of the project was to assess the positive and negative impacts of regulation and to find possibilities for alleviating the adverse impacts on recreational use and the aquatic ecosystem. An exceptional effort was made towards public involvement, which was closely connected to planning and decision making. The applied methods were (1) steering group work, (2) survey, (3) dialogue, (4) theme interviews, (5) public meeting and (6) workshops. The information gathered using these methods was utilized in different stages of the project, e.g., in identifying the regulation impacts, comparing alternatives and compiling the recommendations for regulation development. After describing our case and the results from the applied public involvement methods, we will discuss our experiences and the feedback from the public. We will also critically evaluate our own success in coping with public involvement challenges. In addition to that, we present general recommendations for dealing with these problematic issues based on our experiences, which provide new insights for applying various public involvement methods in multi-objective decision making projects

  17. Local involvement in CDM biogas projects: Argentine experiences

    NARCIS (Netherlands)

    Serna Martín, A.; Dietz, T.

    2008-01-01

    Mitigating climate change and contributing to the sustainable development of host countries are the goals of the CDM. In order to achieve these goals, projects follow an implementation chain, which starts with the design and ends with the issuance of Certified Emission Reductions (CERs). During the

  18. Involving the public into HEP through IT challenges and projects

    CERN Document Server

    Adam Bourdarios, Claire; The ATLAS collaboration

    2016-01-01

    The ATLAS collaboration has recently setup three outreach projects and global challenges which have a strong IT component and could not have been envisaged without the growth of general public computing resources and network connectivity. HEP has exciting and difficult problems like the extraction of the Higgs boson signal, and at the same time data scientists have advanced algorithms. The goal of the Higgs Machine Learning (HiggsML) project was to bring the two together by a “challenge”: machine learning experts could compete online to obtain the best Higgs→ττ signal significance on a set of ATLAS fully simulated Monte Carlo signal and background events. The first challenge of this kind ran from May to September 2014, drawing considerable attention, and new projects followed in the context of the CERN open data initiative. Higgs Hunters is the only physics-related project hosted on a web-based citizen science platform called Zooniverse. Volunteers usually contributing to space, natural world and huma...

  19. Integrating Community into the Classroom: Community Gardening, Community Involvement, and Project-Based Learning.

    Science.gov (United States)

    Langhout, Regina Day; Rappaport, Julian; Simmons, Doretha

    2002-01-01

    Culturally relevant, ongoing project-based learning was facilitated in a predominantly African American urban elementary school via a community garden project. The project involved teachers, students, university members, and community members. This article evaluates the project through two classroom-community collaboration models, noting common…

  20. SPIRE Project: Parental Involvement in Young Children's ESL Reading Development

    Science.gov (United States)

    Harji, Madhubala Bava; Balakrishnan, Kavitha; Letchumanan, Krishnanveni

    2016-01-01

    Realising the clear dichotomy between schools and homes, the Malaysia government has now turned its attention to stakeholders and called for an increase involvement of parents, who are critical in transforming the education system. However, a clear line of demarcation continues to exist between the two prime educators of young children. Schools…

  1. Parent Involvement in Education Project (PIEP): Annual Report.

    Science.gov (United States)

    Southwest Educational Development Lab., Austin, TX.

    This survey is the fifth in a series conducted to gather information about attitudinal barriers to parent involvement and to examine their implications for teacher training. In six states (Arkansas, Louisiana, Mississippi, New Mexico, Oklahoma, and Texas), school superintendents, school board presidents, and state agency officials were asked about…

  2. Health information technology to facilitate communication involving health care providers, caregivers, and pediatric patients: a scoping review.

    Science.gov (United States)

    Gentles, Stephen James; Lokker, Cynthia; McKibbon, K Ann

    2010-06-18

    Pediatric patients with health conditions requiring follow-up typically depend on a caregiver to mediate at least part of the necessary two-way communication with health care providers on their behalf. Health information technology (HIT) and its subset, information communication technology (ICT), are increasingly being applied to facilitate communication between health care provider and caregiver in these situations. Awareness of the extent and nature of published research involving HIT interventions used in this way is currently lacking. This scoping review was designed to map the health literature about HIT used to facilitate communication involving health care providers and caregivers (who are usually family members) of pediatric patients with health conditions requiring follow-up. Terms relating to care delivery, information technology, and pediatrics were combined to search MEDLINE, EMBASE, and CINAHL for the years 1996 to 2008. Eligible studies were selected after three rounds of duplicate screening in which all authors participated. Data regarding patient, caregiver, health care provider, HIT intervention, outcomes studied, and study design were extracted and maintained in a Microsoft Access database. Stage of research was categorized using the UK's Medical Research Council (MRC) framework for developing and evaluating complex interventions. Quantitative and qualitative descriptive summaries are presented. We included 104 eligible studies (112 articles) conducted in 17 different countries and representing 30 different health conditions. The most common conditions were asthma, type 1 diabetes, special needs, and psychiatric disorder. Most studies (88, 85%) included children 2 to 12 years of age, and 73 (71%) involved home care settings. Health care providers operated in hospital settings in 96 (92%) of the studies. Interventions featured 12 modes of communication (eg, Internet, intranets, telephone, video conferencing, email, short message service [SMS], and

  3. Managing delayed projects. Cernavoda NPP - Romania. Importance of NGO involvement

    International Nuclear Information System (INIS)

    Rotaru, I.

    2003-01-01

    In Romania there is a diversity of civil societies with respect to the attitude towards nuclear power. Among the dedicated societies supporting nuclear power development there are: the Romanian Atomic Forum (Ratomet), affiliated to the European Atomic Forum; the Romanian Nuclear Power Association (Arden), affiliated to the European Nuclear Society; the Romanian Radioprotection Society (SR Rp), affiliated to the Radiation Protection Association. The main dedicated activities of above mentioned Non-governmental Organizations (Ng) are: establishing contacts and organizing meeting with Romanian political decision making factors, mass media representatives, institutional entities, civil society ect.; orienting and co-coordinating activities of Romanian companies involved in production and services for nuclear energy; serving as contact point for relevant international communication and business relation; creating internal working groups for certain theme or sub-domain and suggested solution for a particular issue, including experts even from outside of the association; performing lobby activities ect

  4. Regulatory and Stakeholder Involvement is Key to Successful Project Completion

    International Nuclear Information System (INIS)

    Ballinger, K. S.; Coleman, S. J.; Shoemake, J. M.; Olds, T. E.

    2006-01-01

    Public involvement participation is an integral and effective component of the U.S. Department of Energy's (DOE) activities that ensures crucial decisions are made with the benefit and consideration of public perspectives. This component brings a broad range of diverse viewpoints and values into DOE's decision-making processes before end decision points are reached. Early involvement enables DOE to make more informed decisions, improve quality through collaborative efforts, and helps to build mutual understanding and trust between DOE and the public it serves. During the cold war, the production of thousands of nuclear warheads was an outstanding engineering achievement that created materials and technologies that were vital to national interest and security; however, it also created a legacy of perplexing toxic nuclear waste. The significant challenges presented by the liquid and solid nuclear wastes stored at the Hanford Site, were formally acknowledged by the U.S. Congress when it directed DOE to establish the Office of River Protection (ORP). The office was assigned the single, dedicated mission of retrieving, treating, and disposing of all waste contained in 177 huge underground storage tanks at the Hanford Site in Southeastern Washington State. As part of this on-going mission of cleanup, the Office of River Protection must make sound decisions that uphold not only the Department of Energy's interests, but more importantly, the interests of the state of Washington. Public participation is an open, ongoing, two-way communication, both formal and informal, between DOE and its stakeholders, regulatory agencies and Tribal governments. Similarly, public information is a means to keep the public informed of progress or to status ongoing activities and/or issues. Another facet of this process is that various laws and regulations govern public participation and information when it comes to Hanford cleanup, including the Hanford Federal Facility Agreement and Consent

  5. Scope of work-supplemental standards-related fieldwork - Salt Lake City UMTRA Project Site, Salt Lake City, Utah

    International Nuclear Information System (INIS)

    1996-01-01

    This scope of work governs the field effort to conduct transient in situ (hereafter referred to by the trademark name HydroPunch reg-sign) investigative subsurface logging and ground water sampling, and perform well point installation services at the U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Salt Lake City, Utah. The HydroPunch reg-sign and well point services subcontractor (the Subcontractor) shall provide services as stated herein to be used to investigate the subsurface, collect and analyze ground water samples, and install shallow well points

  6. Students in a School Environment: A Project Focused on Family Involvement of At-Risk

    Science.gov (United States)

    Denney, Pat

    2011-01-01

    This project examined family involvement of at risk students in mid-west communities. The purpose of this project was to study the affect of family involvement on at-risk student achievement. The redefining of the perception of America has resulted in a crisis of academic performance in the traditionally slow-changing education systems. This topic…

  7. California Energy Commission Public Interest EnergyResearch/Energy System Integration -- Transmission-Planning Research&Development Scoping Project

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

    2004-07-01

    The objective of this Public Interest Energy Research (PIER)scoping project is to identify options for public-interest research and development (R&D) to improve transmission-planning tools, techniques, and methods. The information presented was gathered through a review of current California utility, California Independent System Operator (ISO), and related western states electricity transmission-planning activities and emerging needs. This report presents the project teams findings organized under six topic areas and identifies 17 distinct R&D activities to improve transmission-planning in California and the West. The findings in this report are intended for use, along with other materials, by PIER staff, to facilitate discussions with stakeholders that will ultimately lead to development of a portfolio of transmission-planning R&D activities for the PIER program.

  8. The Asian Development Bank's past and future involvement in financing gas projects in developing member countries of the Bank

    International Nuclear Information System (INIS)

    Chua, S.B.

    1991-01-01

    This paper presents a review of the Bank's involvement in financing gas projects in its developing member countries (DMC's). The paper highlights the scope of the Bank's past activities in the sector, the DMC's which had received assistance from the Bank, the types of projects financed by the Bank, the benefits expected to be derived from the projects, and the past problems encountered by the Bank. The operational framework under which past Bank lending to the gas sector was conducted is also described. The prospects of natural gas playing a prominent role as an environmentally preferred energy source to oil and coal are outlined. Indications of the direction of the Bank's future efforts to help its gas-resource-rich as well as its gas-resource-poor DMC's to quicken the use of natural gas are given. While emphasizing the Bank's contributions in helping its DMC's to increase gas supply to alleviate energy shortages, the paper stresses the important role the Bank has played and will play in institution-building and sector-development work. The paper explores the possibility for the Bank to expand its operations in the gas sector which will lead to the efficient and accelerated development of a clean energy source that will help its DMC's avoid a third oil crisis and reduce the damaging build-up of a greenhouse gas which now threatens to harm the global environment

  9. Stakeholders' Opinions on "Let the Schools Become Life" Project in Scope of Lifelong Learning Activities

    Science.gov (United States)

    Karatas, Süleyman

    2015-01-01

    The objective of this study is to find out the opinions of school administrators, teachers, staff, benefiting students and parents and other stakeholders of "Let the Schools Become Life" project being carried out in order to reveal the effectiveness and efficiency of the project. Data in this qualitative research was gathered by…

  10. How to scope configuration projects and manage the knowledge they require

    DEFF Research Database (Denmark)

    Shafiee, Sara; Kristjansdottir, Katrin; Hvam, Lars

    2018-01-01

    Purpose This paper aims to explore the use of the knowledge management (KM) perspective for configuration projects. Configuration projects implement configurators as information technology systems that help companies manage the specification process of customised products. An effective method...... of retrieving and formalising knowledge for configurators is essential, because it can reduce the risk of unsuccessful implementation and the time and effort required for development. Unfortunately, no standard KM frameworks are available specifically for configuration projects. This study identifies...... the knowledge necessary for different phases of a configuration project (which knowledge, for what purpose and from what sources), examines how it is transformed during a configuration project (what KM activities and tools are used) and establishes how the knowledge can be documented for future maintenance...

  11. A scoping review of online repositories of quality improvement projects, interventions and initiatives in healthcare.

    Science.gov (United States)

    Bytautas, Jessica P; Gheihman, Galina; Dobrow, Mark J

    2017-04-01

    Quality improvement (QI) is becoming an important focal point for health systems. There is increasing interest among health system stakeholders to learn from and share experiences on the use of QI methods and approaches in their work. Yet there are few easily accessible, online repositories dedicated to documenting QI activity. We conducted a scoping review of publicly available, web-based QI repositories to (i) identify current approaches to sharing information on QI practices; (ii) categorise these approaches based on hosting, scope and size, content acquisition and eligibility, content format and search, and evaluation and engagement characteristics; and (iii) review evaluations of the design, usefulness and impact of their online QI practice repositories. The search strategy consisted of traditional database and grey literature searches, as well as expert consultation, with the ultimate aim of identifying and describing QI repositories of practices undertaken in a healthcare context. We identified 13 QI repositories and found substantial variation across the five categories. The QI repositories used different terminology (eg, practices vs case studies) and approaches to content acquisition, and varied in terms of primary areas of focus. All provided some means for organising content according to categories or themes and most provided at least rudimentary keyword search functionality. Notably, none of the QI repositories included evaluations of their impact. With growing interest in sharing and spreading best practices and increasing reliance on QI as a key contributor to health system performance, the role of QI repositories is likely to expand. Designing future QI repositories based on knowledge of the range and type of features available is an important starting point for improving their usefulness and impact. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  12. 32 CFR 37.220 - How involved should the Government program official be in the project?

    Science.gov (United States)

    2010-07-01

    ... official be in the project? 37.220 Section 37.220 National Defense Department of Defense OFFICE OF THE... Technology Investment Agreements § 37.220 How involved should the Government program official be in the project? (a) TIAs are used to carry out cooperative relationships between the Federal Government and the...

  13. A MILP for multi-machine injection moulding sequencing in the scope of C2NET Project

    Directory of Open Access Journals (Sweden)

    Beatriz Andrés

    2018-01-01

    Full Text Available The goal of C2NET European H2020 Funded Project is the creation of cloud-enabled tools for supporting the SMEs supply network optimization of manufacturing and logistic assets based on collaborative demand, production and delivery plans. In the scope of C2NET Project, and particularly in the Optimisation module (C2NET OPT, this paper proposes a novel holistic mixed integer linear programing (MILP model to optimise the injection sequencing in a multi-machine case. The results of the MILP will support the production planner decision-making process in the calculation of (i moulds setup in certain machines, and (ii the amount of products to produce in order to minimise the setup, inventory, and backorders costs. The designed MILP takes part of the algorithms repository created in C2NET European Funded Project to solve realistic industry planning problems. The MILP is verified in realistic data considering three data sets with different sizes, in order to test it’s the computation efficiency.

  14. Scoping corrosion tests on candidate waste package basket materials for the Yucca Mountain project

    International Nuclear Information System (INIS)

    Konynenburg, R.A. van; Curtis, P.G.; Summers, T.S.E.

    1998-03-01

    A scoping corrosion test was performed on candidate waste package basket materials. The corrosion medium was a pH-buffered solution of chemical species expected to be produced by radiolysis. The test was conducted at 90 C for 96 hours. Samples included aluminum-, copper-, stainless steel- and zirconium-based metallic materials and several ceramics, incorporating neutron-absorbing elements. Sample weight losses and solution chemical changes were measured. Both corrosion of the host materials and dissolution of the neutron-absorbing elements were studied. The ceramics and the zirconium-based materials underwent only minor corrosion. The stainless steel-based materials performed well except for a welded sample. The aluminum- and copper-based materials exhibited the highest corrosion rates. Boron dissolution depends on its chemical form. Boron oxide and many metal borides dissolve readily in acidic solutions while high-chromium borides and boron carbide, though thermodynamically unstable, exhibit little dissolution in short times. The results of solution chemical analyses were consistent with this. Gadolinium did not dissolve significantly from monazite, and hafnium showed little dissolution from a variety of host materials, in keeping with its low solubility

  15. High Temperature Gas-cooled Reactor Projected Markets and Scoping Economics

    Energy Technology Data Exchange (ETDEWEB)

    Larry Demick

    2010-08-01

    The NGNP Project has the objective of developing the high temperature gas-cooled reactor (HTGR) technology to supply high temperature process heat to industrial processes as a substitute for burning of fossil fuels, such as natural gas. Applications of the HTGR technology that have been evaluated by the NGNP Project for supply of process heat include supply of electricity, steam and high-temperature gas to a wide range of industrial processes, and production of hydrogen and oxygen for use in petrochemical, refining, coal to liquid fuels, chemical, and fertilizer plants.

  16. Partners in projects: preparing for public involvement in health and social care research.

    Science.gov (United States)

    Parkes, Jacqueline H; Pyer, Michelle; Wray, Paula; Taylor, Jane

    2014-09-01

    In recent years, several UK and, international funders of health and social care related research have adopted the policy of requiring explicit evidence of the 'public' voice in all aspects of project design. For many academic researchers engaged within research, evaluations or audit projects, this formal requirement to actively engage members of the public will present them with both benefits and challenges to securing knowledgeable, skilled, and confident lay representation onto project teams. This could potentially lead to the exploitation of those individuals who are available, appropriately informed, and adequately prepared for such activities. Currently, much of the preparation of patients or members of the public for research involvement tends to be aligned to specific projects; however, with the call for greater active and meaningful involvement of lay representatives in future national and international funding applications, there is clearly a growing need to 'train' sufficient numbers of confident and competent representatives to meet this growing demand. This paper describes the development of a specifically designed research awareness training programme and underpinning theoretical model, which has been specifically designed to support active and meaningful lay involvement in research, evaluations and audit projects. Developed over a four year period, the course is a culmination of learning extracted from a series of four completed research projects, which have incorporated an element of public and patient involvement (PPI) training in their overall design. Crown Copyright © 2014. Published by Elsevier Ireland Ltd. All rights reserved.

  17. South African programme for the SCOPE mid-term project on the ecological effects of fire.

    CSIR Research Space (South Africa)

    Huntley, BJ

    1978-09-01

    Full Text Available involve limited research activities on selected topics within eight main review themes. The emphasis will fall on the analysis and interpretation of the results of existing long-term burning trials in savanna, grassland and fynbos biomes. The programme...

  18. UP2 400 High Activity Oxide Legacy Waste Retrieval Project Scope and Progress-13048

    Energy Technology Data Exchange (ETDEWEB)

    Chabeuf, Jean-Michel; Varet, Thierry [AREVA Site Value Development Business Unit, La Hague Site (France)

    2013-07-01

    The High Activity Oxide facility (HAO) reprocessed sheared and dissolved 4500 metric tons of light water reactor fuel the fuel of the emerging light water reactor spent fuel between 1976 and 1998. Over the period, approximately 2200 tons of process waste, composed primarily of sheared hulls, was produced and stored in a vast silo in the first place, and in canisters stored in pools in subsequent years. Upon shutdown of the facility, AREVA D and D Division in La Hague launched a thorough investigation and characterization of the silos and pools content, which then served as input data for the definition of a legacy waste retrieval and reconditioning program. Basic design was conducted between 2005 and 2007, and was followed by an optimization phase which lead to the definition of a final scenario and budget, 12% under the initial estimates. The scenario planned for the construction of a retrieval and reconditioning cell to be built on top of the storage silo. The retrieved waste would then be rinsed and sorted, so that hulls could subsequently be sent to La Hague high activity compacting facility, while resins and sludge would be cemented within the retrieval cell. Detailed design was conducted successfully from 2008 until 2011, while a thorough research and development program was conducted in order to qualify each stage of the retrieval and reconditioning process, and assist in the elaboration of the final waste package specification. This R and D program was defined and conducted as a response and mitigation of the major project risks identified during the basic design process. Procurement and site preparatory works were then launched in 2011. By the end of 2012, R and D is nearly completed, the retrieval and reconditioning process have been secured, the final waste package specification is being completed, the first equipment for the retrieval cell is being delivered on site, while preparation works are allowing to free up space above and around the silo, to

  19. A Project in Thermal Physics Involving a Car Parked in Direct Sunlight

    Science.gov (United States)

    Lee, Wei; Gilley, Heidi L.; Caris, Joshua B.

    1997-05-01

    A research project for introductory physics students, involving an estimate of the surface temperature of the Sun using a parked car, was carried out in the Summer 1995 Research Apprenticeships in Science Program, sponsored by Edison Industrial Systems Center, for local-area high school students. This activity entails both outdoor quantitative observations and theoretical analysis, and yields a result within 12 percent of the accepted value. It was demonstrated that the use of everyday materials and outdoor observations, such as those in this project, is not only educational but also intriguing. The success of this experiment as a summer research project will be discussed.

  20. The tail wags the dog: managing large telescope construction projects with lagging requirements and creeping scope

    Science.gov (United States)

    Warner, Mark

    2014-08-01

    In a perfect world, large telescopes would be developed and built in logical, sequential order. First, scientific requirements would be agreed upon, vetted, and fully developed. From these, instrument designers would define their own subsystem requirements and specifications, and then flesh out preliminary designs. This in turn would then allow optic designers to specify lens and mirror requirements, which would permit telescope mounts and drives to be designed. Finally, software and safety systems, enclosures and domes, buildings, foundations, and infrastructures would be specified and developed. Unfortunately, the order of most large telescope projects is the opposite of this sequence. We don't live in a perfect world. Scientists usually don't want to commit to operational requirements until late in the design process, instrument designers frequently change and update their designs due to improving filter and camera technologies, and mount and optics engineers seem to live by the words "more" and "better" throughout their own design processes. Amplifying this is the fact that site construction of buildings and domes are usually the earliest critical path items on the schedule, and are often subject to lengthy permitting and environmental processes. These facility and support items therefore must quickly get underway, often before operational requirements are fully considered. Mirrors and mounts also have very long lead times for fabrication, which in turn necessitates that they are specified and purchased early. All of these factors can result in expensive and time-consuming change orders when requirements are finalized and/or shift late in the process. This paper discusses some of these issues encountered on large, multi-year construction projects. It also presents some techniques and ideas to minimize these effects on schedule and cost. Included is a discussion on the role of Interface Control Documents (ICDs), the importance (and danger) of making big

  1. Factors Influencing the Private Involvement in Urban Rail Public-Private Partnership Projects in China

    Directory of Open Access Journals (Sweden)

    Yongjian Ke

    2017-03-01

    Full Text Available Private investors have been encouraged to participate in the development and operation of urban rail projects in China through Public-Private Partnerships (PPPs, given the fact that subnational governments are suffering from urgent development demands and severe fiscal pressure. However, there is no formal assessment to determine the private involvement in a PPP project. This problem is particularly critical in the sector of urban rail, in which the huge investment cannot rely on the private sector alone. This study hence aimed to uncover and identify the influencing factors. Multiple research methods, including content analysis, case study and focus group discussion were adopted to achieve the research purpose. Seven types of influencing factors were identified, including project financial model, government fiscal commitment, risk allocation, public accountability, efficiency considerations, policy and regulations, and organisational marketing strategies. The findings add to the current knowledge base by uncovering the drivers behind private involvement in a PPP project. They are also beneficial for industry practitioners as a basis/checklist to determine the private involvement.

  2. Undergraduate Research Involving Deaf and Hard-of-Hearing Students in Interdisciplinary Science Projects

    Directory of Open Access Journals (Sweden)

    Todd Pagano

    2015-05-01

    Full Text Available Scientific undergraduate research in higher education often yields positive outcomes for student and faculty member participants alike, with underrepresented students often showing even more substantial gains (academic, professional, and personal as a result of the experience. Significant success can be realized when involving deaf and hard-of-hearing (d/hh undergraduate students, who are also vastly underrepresented in the sciences, in interdisciplinary research projects. Even d/hh Associate degree level students and those in the first two years of their postsecondary careers can contribute to, and benefit from, the research process when faculty mentors properly plan/design projects. We discuss strategies, including the dissemination/communication of research results, for involving these students in research groups with different communication dynamics and share both findings of our research program and examples of successful chemical and biological research projects that have involved d/hh undergraduate students. We hope to stimulate a renewed interest in encouraging diversity and involving students with disabilities into higher education research experiences globally and across multiple scientific disciplines, thus strengthening the education and career pipeline of these students.

  3. Involving youth with disabilities in the development and evaluation of a new advocacy training: Project TEAM.

    Science.gov (United States)

    Kramer, Jessica; Barth, Yishai; Curtis, Katie; Livingston, Kit; O'Neil, Madeline; Smith, Zach; Vallier, Samantha; Wolfe, Ashley

    2013-04-01

    This paper describes a participatory research process in which six youth with disabilities (Youth Panel) participated in the development and evaluation of a manualized advocacy training, Project TEAM (Teens making Environment and Activity Modifications). Project TEAM teaches youth with disabilities how to identify environmental barriers, generate solutions, and request accommodations. The Youth Panel conducted their evaluation after the university researcher implemented Project TEAM with three groups of trainees. The Youth Panel designed and administered a survey and focus group to evaluate enjoyment and usefulness of Project TEAM with support from an advocate/researcher. Members of the Youth Panel analyzed survey response frequencies. The advocate/researcher conducted a content analysis of the open-ended responses. Sixteen of 21 Project TEAM trainees participated in the evaluation. The evaluation results suggest that the trainees found the interactive and individualized aspects of the Project TEAM most enjoyable and useful. Some instructional materials were difficult for trainees with cognitive disabilities to understand. The Youth Panel's involvement in the development of Project TEAM may explain the relatively positive experiences reported by trainees. Project TEAM should continue to provide trainees with the opportunity to apply concepts in real-life situations. Project TEAM requires revisions to ensure it is enjoyable and useful for youth with a variety of disabilities. • Group process strategies, picture-based data collection materials, peer teamwork, and mentorship from adults with disabilities can enable youth with disabilities to engage in research. • Collaborating with youth with disabilities in the development of new rehabilitation approaches may enhance the relevance of interventions for other youth with disabilities. • Youth with cognitive disabilities participating in advocacy and environment-focused interventions may prefer interactive and

  4. Web-based Data Mining to Systematically Determine Data Quality From the EarthScope USArray Seismic Observatory Project

    Science.gov (United States)

    Newman, R. L.; Lindquist, K. G.; Hansen, T. S.; Vernon, F. L.; Eakins, J.; Foley, S.

    2004-12-01

    When fully operational, the Transportable Array (TA) and Flexible Array (FA) components of the continent-scale EarthScope USArray seismic observatory project will provide telemetered real-time data from up to 600 stations. By the fifth year of the deployment the predicted total amount of data production for the TA and FA will be approximately 1500 Gb/yr and approximately 1000 Gb/yr respectively. In addition to delivering the data to the IRIS Data Management Center (DMC) for permanent archiving, the Array Network Facility (ANF) is charged with real-time data quality control, calibration, metadata storage and retrieval, network monitoring and local archiving. The Antelope real-time processing software provides the back-bone to this effort, supported by the Storage Resource Broker data replication/archiving system and the Nagios network monitoring tool. Real-time, web-based data mining, with support for multiple database schemas, is provided by an Antelope interface to both Perl and PHP scripting languages. This allows embedding of database functions in HTML. A suite of online tools allows query and graphical display of dynamic real-time sensor network parameters such as data latency, network topologies, and data return rates. Data and metadata are also web-accessible, for example XML trees of seismic data and graphical display of instrument response functions. The purpose of these tools is to provide the ANF, IRIS and end-users of USArray data with a real-time systematic method of determining data quality for the spatio-temporal area of interest. The tools are accessible at http://anf.ucsd.edu

  5. Global Dynamical Systems Involving Generalized -Projection Operators and Set-Valued Perturbation in Banach Spaces

    Directory of Open Access Journals (Sweden)

    Yun-zhi Zou

    2012-01-01

    Full Text Available A new class of generalized dynamical systems involving generalized f-projection operators is introduced and studied in Banach spaces. By using the fixed-point theorem due to Nadler, the equilibrium points set of this class of generalized global dynamical systems is proved to be nonempty and closed under some suitable conditions. Moreover, the solutions set of the systems with set-valued perturbation is showed to be continuous with respect to the initial value.

  6. The involvement of young people in school- and community-based noncommunicable disease prevention interventions: a scoping review of designs and outcomes

    Directory of Open Access Journals (Sweden)

    Didier Jourdan

    2016-10-01

    Full Text Available Abstract Background Since stakeholders’ active engagement is essential for public health strategies to be effective, this review is focused on intervention designs and outcomes of school- and community-based noncommunicable disease (NCD prevention interventions involving children and young people. Methods The review process was based on the principles of scoping reviews. A systematic search was conducted in eight major databases in October 2015. Empirical studies published in English, French, Portuguese, and Spanish were considered. Five selection criteria were applied. Included in the review were (1 empirical studies describing (2 a health intervention focused on diet and/or physical activity, (3 based on children’s and young people’s involvement that included (4 a relationship between school and local community while (5 providing explicit information about the outcomes of the intervention. The search provided 3995 hits, of which 3253 were screened by title and abstract, leading to the full-text screening of 24 papers. Ultimately, 12 papers were included in the review. The included papers were analysed independently by at least two reviewers. Results Few relevant papers were identified because interventions are often either based on children’s involvement or are multi-setting, but rarely both. Children were involved through participation in needs assessments, health committees and advocacy. School-community collaboration ranged from shared activities, to joint interventions with common goals and activities. Most often, collaboration was school-initiated. Most papers provided a limited description of the outcomes. Positive effects were identified at the organisational level (policy, action plans, and healthy environments, in adult stakeholders (empowerment, healthy eating and in children (knowledge, social norms, critical thinking, and health behaviour. Limitations related to the search and analytical methods are discussed. Conclusion

  7. User and stakeholder involvement for relevant, reliable and robust local-scale climate projections in Norway

    Science.gov (United States)

    Neby, Simon; Sobolowski, Stefan

    2017-04-01

    How can users and stakeholders be actively involved with providing input to and using output from local-scale climate projections? How can the scientific community better understand the needs of local actors? And how should communication and cooperation efforts be organized? These are critical questions we aim to answer in a climate services project funded by the Norwegian Research Council (R3: Relevant, Reliable and Robust local-scale climate projections for Norway). The project takes into consideration not only the scientific issues in establishing useful local-scale climate projections, but also addresses the "usability gap" between climate information and decision-making. The lack of effective communication between scientists and user communities often result in outputs and products that are not matched with decision-relevant climate information. In the R3 project, the scientific participants actively engage with a range of users that have quite different information needs: municipalities, infrastructure developers, agriculture, energy producers, insurance companies, and more. In this particular presentation, we present our experiences concerning three specific issues that relate to the stakeholder-science interface: 1) Preferences are not clear-cut and pre-defined. In practice, this means that stakeholders often do not have precise information about their needs, nor precise information about how, where and whether their needs can be voiced. Similarly, science communities tend to presuppose that stakeholders are interested and have well-articulated needs, which is hardly the case. Collectively, that means that there is a need for an approach that guides the articulation and prioritization of preferences in a manner that integrates both scientific and stakeholder perspectives and takes the integrity of both perspectives seriously. 2) Technologies are unclear. Although information may be produced and used, past experiences, trial and error processes and pragmatic

  8. Being useful: achieving indigenous youth involvement in a community-based participatory research project in Alaska

    Directory of Open Access Journals (Sweden)

    Tara Ford

    2012-05-01

    Full Text Available Objectives. To report on a participatory research process in southwest Alaska focusing on youth involvement as a means to facilitate health promotion. We propose youth-guided community-based participatory research (CBPR as way to involve young people in health promotion and prevention strategizing as part of translational science practice at the community-level. Study design. We utilized a CBPR approach that allowed youth to contribute at all stages. Methods. Implementation of the CBPR approach involved the advancement of three key strategies including: (a the local steering committee made up of youth, tribal leaders, and elders, (b youth-researcher partnerships, and (c youth action-groups to translate findings. Results. The addition of a local youth-action and translation group to the CBPR process in the southwest Alaska site represents an innovative strategy for disseminating findings to youth from a research project that focuses on youth resilience and wellbeing. This strategy drew from two community-based action activities: (a being useful by helping elders and (b being proud of our village. Conclusions. In our study, youth informed the research process at every stage, but most significantly youth guided the translation and application of the research findings at the community level. Findings from the research project were translated by youth into serviceable action in the community where they live. The research created an experience for youth to spend time engaged in activities that, from their perspectives, are important and contribute to their wellbeing and healthy living. Youth-guided CBPR meant involving youth in the process of not only understanding the research process but living through it as well.

  9. Stake holder involvement in the Canadian review process for uranium production projects in Northern Saskatchewan

    International Nuclear Information System (INIS)

    Underhill, D.

    2004-01-01

    This report describes the Canadian environmental review process for uranium production projects as a case study for the purpose of understanding the nature and value of stakeholder involvement in the management of radiological hazards. While the Canadian review process potentially applies to any development, this case study focuses on the assessment of the uranium projects of northern Saskatchewan conducted during the 1990's. It describes the environmental assessment (EA) conducted in the 1990's for six new uranium facilities (including mines and mills and related tailings disposal sites) planned in northern Saskatchewan. Both the Canadian federal and the Saskatchewan provincial government have extensive environmental review processes that must under law be complete before any major industrial development judged to have potential environmental impacts is undertaken within their respective territories. However, even in those instances where no clear potential environmental impacts are evident, Canadian law mandates 'if public concern about the proposal is such that a public review is desirable, the initiating department shall refer the proposal to the Minister for review by a Panel'. (Wh95) As a stakeholder under law, in both Canada and Saskatchewan, the public plays an important role in the environmental review process. To encourage participation and assist the public in its review the two governments may provide funding (as done in this review) to assist qualified individuals or groups to participant in the review process. The first section of this case study sets the scene. It describes the Saskatchewan uranium mining story, focusing on how the importance of the public stakeholder evolved to become a major component, under law, in the EA process for new uranium mines. This increase in stakeholder involvement opportunities coincided with heightened public concern for the socio-economic impacts of the projects. In the late 1980's both governments were advised by

  10. Proceedings of the topical session on stakeholder involvement in decommissioning projects

    International Nuclear Information System (INIS)

    Santiago, Juan Luis; Chandler, Steve; Metcalfe, Doug; Le Bars, Yves

    2006-01-01

    Set up by the Radioactive Waste Management Committee (RWMC), the WPDD brings together senior representatives of national organisations who have a broad overview of Decommissioning and Dismantling (D and D) issues through their work as regulators, implementers, R and D experts or policy makers. These include representatives from regulatory authorities, industrial decommissioners from the NEA Co-operative Programme on Exchange of Scientific and Technical Information on Nuclear Installation Decommissioning Projects (CPD), and cross-representation from the other NEA Committees. The EC is a member of the WPDD and the IAEA is participating as an observer. This broad participation provides good possibilities for the co-ordination efforts amongst activities in the international programmes. At its sixth meeting, in Paris, 14-16 November 2005, the WPDD held a topical session on the 'Stakeholder Involvement in Decommissioning Projects'. The topical session was jointly planned and run with members of the NEA Forum on Stakeholder Confidence (FSC). This report documents the topical session. The main text summarises the lessons learnt and includes the rapporteurs reports. Appendix 1 and 2 provide the agenda of the topical session and all contributed papers respectively. The Topical session also provided a stimuli to review all the contributions in the area of stakeholder involvement that the WPDD has received since its inception. A list of references is provided in Appendix 3. The topical session was meant to provide an exchange of information and experience on the following issues: - Views from Stakeholders Regarding Stakeholder Involvement and Their Own Role. - Case Studies on Stakeholders Confidence. At the end of each session time was allotted for a plenary discussion. The Rapporteur reviewed the main points and the lessons learnt at the end of the whole Topical Session. (authors)

  11. Public Values and Stakeholder Involvement - A new framework for Performance Assessment? The European Project RISCOM-II. Work Package 1

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Kjell [Karinta-Konsult, Taeby (Sweden); Chataignier, Stephane [Electricite de France (France); Drottz-Sjoeberg, Britt-Marie [BMD Research (Sweden)] [and others

    2002-11-01

    RISCOM-II is a project within the fifth framework programme of the European Commission. It is based on a widely recognised need for more transparent decision processes in nuclear waste management. The objective of the RISCOM-II project is to share the knowledge of the context of radioactive waste management in various European countries and to see to what extent it is possible to apply more widely the RISCOM Model in order to improve the acceptability of radioactive waste management. Thus, the project aims to promote the development of processes involving transparency, as well as means involving greater participation of the public. Key topics studied in the RISCOM-II Project are issues in risk assessment to better understand how factual elements relate to value-laden issues and how stakeholder concerns can be addressed, as well as organizational issues affecting transparency in Europe. A range of public participation processes are analysed, some will be selected for testing and hearings are evaluated with respect to transparency. There are five participating countries: Sweden, the United Kingdom, Finland, the Czech Republic, and France, which are represented by various organizations: safety or radiation protection authorities, operators involved in nuclear wastes and the production of nuclear power, research institutes or organizations, and consultants. Work Package No 1(WP-1), Public values and performance assessment, emphasises the importance of value-laden issues involved in nuclear waste management. The expert dominance in the field has so far tended to avoid values or deal with them in seemingly factual frameworks. The objectives of (WP-1) are thus: 1. to identify value-laden issues raised by performance assessment, trying to understand how factual and technical elements relate to value-laden issues 2. to find value judgements of stakeholders, and explore if and how they could be addressed in performance assessment 3. to initiate open debate about risk and

  12. Public Values and Stakeholder Involvement - A new framework for Performance Assessment? The European Project RISCOM-II. Work Package 1

    International Nuclear Information System (INIS)

    Andersson, Kjell; Chataignier, Stephane; Drottz-Sjoeberg, Britt-Marie

    2002-11-01

    RISCOM-II is a project within the fifth framework programme of the European Commission. It is based on a widely recognised need for more transparent decision processes in nuclear waste management. The objective of the RISCOM-II project is to share the knowledge of the context of radioactive waste management in various European countries and to see to what extent it is possible to apply more widely the RISCOM Model in order to improve the acceptability of radioactive waste management. Thus, the project aims to promote the development of processes involving transparency, as well as means involving greater participation of the public. Key topics studied in the RISCOM-II Project are issues in risk assessment to better understand how factual elements relate to value-laden issues and how stakeholder concerns can be addressed, as well as organizational issues affecting transparency in Europe. A range of public participation processes are analysed, some will be selected for testing and hearings are evaluated with respect to transparency. There are five participating countries: Sweden, the United Kingdom, Finland, the Czech Republic, and France, which are represented by various organizations: safety or radiation protection authorities, operators involved in nuclear wastes and the production of nuclear power, research institutes or organizations, and consultants. Work Package No 1(WP-1), Public values and performance assessment, emphasises the importance of value-laden issues involved in nuclear waste management. The expert dominance in the field has so far tended to avoid values or deal with them in seemingly factual frameworks. The objectives of (WP-1) are thus: 1. to identify value-laden issues raised by performance assessment, trying to understand how factual and technical elements relate to value-laden issues 2. to find value judgements of stakeholders, and explore if and how they could be addressed in performance assessment 3. to initiate open debate about risk and

  13. The use of public participation and economic appraisal for public involvement in large-scale hydropower projects: Case study of the Nam Theun 2 Hydropower Project

    International Nuclear Information System (INIS)

    Mirumachi, Naho; Torriti, Jacopo

    2012-01-01

    Gaining public acceptance is one of the main issues with large-scale low-carbon projects such as hydropower development. It has been recommended by the World Commission on Dams that to gain public acceptance, public involvement is necessary in the decision-making process (). As financially-significant actors in the planning and implementation of large-scale hydropower projects in developing country contexts, the paper examines the ways in which public involvement may be influenced by international financial institutions. Using the case study of the Nam Theun 2 Hydropower Project in Laos, the paper analyses how public involvement facilitated by the Asian Development Bank had a bearing on procedural and distributional justice. The paper analyses the extent of public participation and the assessment of full social and environmental costs of the project in the Cost-Benefit Analysis conducted during the project appraisal stage. It is argued that while efforts were made to involve the public, there were several factors that influenced procedural and distributional justice: the late contribution of the Asian Development Bank in the project appraisal stage; and the issue of non-market values and discount rate to calculate the full social and environmental costs. - Highlights: ► Public acceptance in large-scale hydropower projects is examined. ► Both procedural and distributional justice are important for public acceptance. ► International Financial Institutions can influence the level of public involvement. ► Public involvement benefits consideration of non-market values and discount rates.

  14. A scoping review of the experiences, benefits, and challenges involved in volunteer work among youth and young adults with a disability.

    Science.gov (United States)

    Lindsay, Sally

    2016-08-01

    To develop a better understanding of the experiences of volunteer work among youth with disabilities. A scoping review was undertaken to assess the benefits and challenges of volunteering among youth with disabilities. Comprehensive searches using six international databases were conducted. Eligible articles included: (a) youth aged 30 or younger, with a disability; (b) empirical research on the benefits or challenges of volunteering; (c) published in a peer-reviewed journal between 1980 and 2014. Of the 1558 articles identified, 20 articles - involving 1409 participants, aged 12-30, across five countries - met the inclusion criteria. Studies linked volunteering to the development of human capital (i.e. practical experience, improved self-determination, self-confidence, coping), enhanced social capital (i.e. social and communication skills, social inclusion) and improved cultural capital (i.e. helping others, contributing to community). Many youth with disabilities also encountered challenges - including lack of accessible volunteer opportunities, difficulties arranging transportation, and negative attitudes from potential supervisors. Young people with disabilities are willing and able to volunteer, and they report benefits of volunteering; however, they face many challenges in finding suitable volunteer positions. More rigorous research is needed to understand the health and social benefits of volunteering and how it can help youth develop career pathways. Implications for Rehabilitation Clinicians, educators and parents should discuss the benefits of volunteering with youth with disabilities and assist them in finding placements that match their interests and abilities. Managers and clinicians should consider incorporating volunteering into vocational rehabilitation programming (i.e. addressing how to find placements and connecting youth to organisations). Clinicians should encourage youth to take part in social and extracurricular activities to help build their

  15. Patterns in professional growth of science teachers involved in a team-based PD project

    DEFF Research Database (Denmark)

    Nielsen, Birgitte Lund

    and learning and subsequent discussion of this material. Repeated interviews were analyzed using an adapted version of the interconnected model of teachers’ professional growth. The results show various ways of experimenting with new approaches to be important for three of the teachers while a novice teacher...... the participants refer to. Conclusion is that there are professional growth patterns, especially a pattern involving experimenting, which have a forward-pointing potential to be used to inform school based PD. The results implicate that the same PD project can frame experimenting into practice in various tempi...... and with differentiated facilitation aligned to the individual teacher’s current needs and that external support of science resource teachers can be an integrated part of school based PD....

  16. The Memory-Impairing Effects of Septal GABA Receptor Activation Involve GABAergic Septo-Hippocampal Projection Neurons

    Science.gov (United States)

    Krebs-Kraft, Desiree L.; Wheeler, Marina G.; Parent, Marise B.

    2007-01-01

    Septal infusions of the [gamma]-aminobutyric acid (GABA)[subscript A] agonist muscimol impair memory, and the effect likely involves the hippocampus. GABA[subscript A] receptors are present on the perikarya of cholinergic and GABAergic septo-hippocampal (SH) projections. The current experiments determined whether GABAergic SH projections are…

  17. The International Science and Technology Center: Scope of activities and scientific projects in the field of nuclear data

    International Nuclear Information System (INIS)

    Klepatsky, Alexander B.

    2002-01-01

    The review of the ISTC (The International Science and Technology Center) Programs and activities including Science Project Program, Partner Program, Seminar Program and others is presented. Project funding by technology area, by funding Parties, by CIS (Commonwealth of Independent States) States etc. is demonstrated with emphasis on projects in the field of nuclear data. The ISTC opportunities for international cooperation in the fields of nuclear data measurements, calculation, evaluation and dissemination are discussed. (author)

  18. Maturity of project scope management in MTN South Africa: a gap analysis leading to a roadmap for excellence

    OpenAIRE

    2011-01-01

    M.Tech. In the volatile telecommunication industry, innovation is the key to success. Mobile Telephone Network South Africa (MTN SA) needs to launch new products and services consistently to stay on the competitive edge. Consequently, effective project management becomes the key to gaining the competitive advantage by turning new product or service concepts into reality. According to Nokes and Kelly (2007:153–156), there is a high correlation between project success and effective project s...

  19. CITON involvement in CETRAD project on 'Education and training in radiation protection and radioactive waste'

    International Nuclear Information System (INIS)

    Comsa, Olivia; Meglea, Claudia; Banutoiu, Marina; Paraschiva, M. V.; Meglea, S.

    2003-01-01

    Within the European Community and world-wide there is extensive experience in the principles and practice of radiation protection and radioactive waste management. Nuclear skills and capabilities have grown and evolved since the inception of nuclear technology in the 1940s. However, with the current stagnation of the nuclear industry it is increasingly acknowledged that the skills and expertise held by the generation who grew up with nuclear technology are being passed on to new generations of experts. This poses a significant risk to the community who will need to manage nuclear liabilities for long times into the future in order to protect future society from radiological hazards. Notwithstanding that the state of the art in nuclear waste management is undoubtedly high in many organizations, it is very clear that there is continuous need for the provision of education and training in this area. The various training and education programmes throughout Europe are at different stages of development. There is undoubtedly a need for harmonization of the numerous programmes and there would be great benefit to countries at early stages of development due to the learning experiences from the more developed organizations. The objective of CETRAD is to develop proposals for structuring and delivering both education and training in the management of the geological disposal of long-lived radioactive waste and radiation protection across Europe. This proposal is seen as a forerunner of a more comprehensive pan-European Network in this area, which it is planned, will emerge from this work. The project activities will be carried out in two phases. Phase 1 will involve national evaluations of both the needs for education and training and the existing infrastructure and resources in the field of radiation protection and radioactive waste management. Phase 2 will involve development of specific proposals for education and training based on the needs identified in Phase 1. (authors)

  20. Religious factors associated with alcohol involvement: results from the Mauritian Joint Child Health Project.

    Science.gov (United States)

    Luczak, Susan E; Prescott, Carol A; Dalais, Cyril; Raine, Adrian; Venables, Peter H; Mednick, Sarnoff A

    2014-02-01

    The purpose of this study was to examine religious factors associated with alcohol involvement in Mauritius. The three main religions on the island, Hinduism, Catholicism, and Islam, promote different views of the appropriate use of alcohol. Based on reference group theory, we hypothesized that both the content of a religion's alcohol norms and an individual's religious commitment would relate to alcohol use behavior. Participants were from the Joint Child Health Project, a longitudinal study that has followed a birth cohort of 1.795 individuals since 1972 when they were 3 years old. All available participants (67%; 55% male) were assessed in mid-adulthood on religious variables, lifetime drinking, and lifetime alcohol use disorders. Across religions, individuals who viewed their religion as promoting abstinence were less likely to be drinkers. Religious commitment was associated with reduced probability of drinking only in those who viewed their religion as promoting abstinence. Among drinkers, abstention norms and religious commitment were not associated with lower likelihood of alcohol use disorders. In Catholics who viewed their religion as promoting abstinence and still were drinkers, high religious commitment was associated with increased risk for alcohol use disorders. Predictions based on reference group theory were largely supported, with religious norms and commitment differentially related to alcohol use and problems both across religions and among individuals within religions. Findings highlight the importance of examining multiple aspects of religion to better understand the relationship of religion with alcohol behaviors. Copyright © 2013 Elsevier Ireland Ltd. All rights reserved.

  1. EarthScope Education and Outreach: Accomplishments and Emerging Opportunities

    Science.gov (United States)

    Robinson, S.; Ellins, K. K.; Semken, S. C.; Arrowsmith, R.

    2014-12-01

    EarthScope's Education and Outreach (E&O) program aims to increase public awareness of Earth science and enhance geoscience education at the K-12 and college level. The program is distinctive among major geoscience programs in two ways. First, planning for education and public engagement occurred in tandem with planning for the science mission. Second, the NSF EarthScope program includes funding support for education and outreach. In this presentation, we highlight key examples of the program's accomplishments and identify emerging E&O opportunities. E&O efforts have been collaboratively led by the EarthScope National Office (ESNO), IRIS, UNAVCO, the EarthScope Education and Outreach Subcommittee (EEOSC) and PI-driven EarthScope projects. Efforts by the EEOSC, guided by an EarthScope Education and Outreach Implementation Plan that is periodically updated, focus EarthScope E&O. EarthScope demonstrated early success in engaging undergraduate students (and teachers) in its mission through their involvement in siting USArray across the contiguous U.S. Funded E&O programs such as TOTLE, Illinois EarthScope, CEETEP (for K-12), InTeGrate and GETSI (for undergraduates) foster use of freely available EarthScope data and research findings. The Next Generation Science Standards, which stress science and engineering practices, offer an opportunity for alignment with existing EarthScope K-12 educational resources, and the EEOSC recommends focusing efforts on this task. The EEOSC recognizes the rapidly growing use of mobile smart devices by the public and in formal classrooms, which bring new opportunities to connect with the public and students. This will capitalize on EarthScope's already prominent social media presence, an effort that developed to accomplish one of the primary goals of the EarthScope E&O Implementation Plan to "Create a high-profile public identity for EarthScope" and to "Promote science literacy and understanding of EarthScope among all audiences through

  2. Early Involvement and Integration in Construction Projects: The Benefits of DfX in Elimination of Wastes

    Directory of Open Access Journals (Sweden)

    Heikki Halttula

    2017-12-01

    Full Text Available Typical construction processes provide waste: material waste but especially process-related waste. The majority of this waste can be avoided with efficient planning in the front end of projects. The main aim is to describe how the concept of Design for Excellence (DfX can reduce the most severe waste in construction projects. Based on a literature review of waste and requirements that aid early involvement and integration, we created a survey for analyzing and prioritizing types of waste in the construction industry. We describe how DFX reduces this waste, especially through the use of early involvement and integration. When applied, DfX creates incentives for project stakeholders to eliminate waste automatically through early involvement and integration.

  3. Learning to work together - lessons from a reflective analysis of a research project on public involvement.

    Science.gov (United States)

    Howe, A; Mathie, E; Munday, D; Cowe, M; Goodman, C; Keenan, J; Kendall, S; Poland, F; Staniszewska, S; Wilson, P

    2017-01-01

    Patient and public involvement (PPI) in research is very important, and funders and the NHS all expect this to happen. What this means in practice, and how to make it really successful, is therefore an important research question. This article analyses the experience of a research team using PPI, and makes recommendations on strengthening PPI in research. There were different PPI roles in our study - some people were part of the research team: some were on the advisory group; and there were patient groups who gave specific feedback on how to make research work better for their needs. We used minutes, other written documents, and structured individual and group reflections to learn from our own experiences over time. The main findings were:- for researchers and those in a PPI role to work in partnership, project structures must allow flexibility and responsiveness to different people's ideas and needs; a named link person can ensure support; PPI representatives need to feel fully included in the research; make clear what is expected for all roles; and ensure enough time and funding to allow meaningful involvement. Some roles brought more demands but also more rewards than others - highlighting that it is important that people giving up their time to help with research experience gains from doing so. Those contributing to PPI on a regular basis may want to learn new skills, rather than always doing the same things. Researchers and the public need to find ways to develop roles in PPI over time. We also found that, even for a team with expertise in PPI, there was a need both for understanding of different ways to contribute, and an evolving 'normalisation' of new ways of working together over time, which both enriched the process and the outputs. Background Patient and public involvement (PPI) is now an expectation of research funders, in the UK, but there is relatively little published literature on what this means in practice - nor is there much evaluative research

  4. Conceptual Evolution and Importance of Andragogy towards the Scope Optimization of University Academic Rural Development Programs and Projects

    Directory of Open Access Journals (Sweden)

    José Bernal Azofeifa-Bolaños

    2016-12-01

    Full Text Available This study was carried out with the objective of describing the evolution and importance of andragogical processes in the search of rural profiles committed to the university work in the development and implementation of programs and projects. Among its main contributions, the importance of knowing and teaching processes applied strictly for adults by university coordinators of programs and projects stands out. The relevance of applying this kind of knowledge will allow efficient use of institutional financial resources, particularly for the real commitment of the rural adult community towards the implementation of field activities and accomplishing, in a shorter term, the expected academic achievement. A successful project experience is described in which some andragogical strategies were applied through extension, and which produced a better participation and engagement from rural people with the projects developed by the University. Consequently, applicability of these concepts in the programs and projects of rural development promoted through universities must lay the foundation for regional rural development strategies with the ultimate goal of finding ways to improve the quality of life of people in particular scenarios.

  5. Influence of 4-H Horse Project Involvement on Development of Life Skills

    Science.gov (United States)

    Anderson, K. P.; Karr-Lilienthal, L.

    2011-01-01

    Four-H horse project members who competed in non-riding horse contests were surveyed to evaluate the influence of their horse project participation on life-skill development. Contests in which youth competed included Horse Bowl, Demonstrations, Public Speaking, and Art. Youth indicated a positive influence on both life-skill development and horse…

  6. Reaping the harvest: nursing student service involvement with a campus gardening project.

    Science.gov (United States)

    Ahonen, Kathleen; Lee, Carolyn; Daker, Emily

    2012-01-01

    The authors describe the development and incorporation of a multidisciplinary community garden as a service project in a baccalaureate nursing cohort in an urban university. The concepts of professional ethics and service, application of nutritional theory to a community cohort, and competencies in community health nursing are briefly discussed and applied to this service project.

  7. A Scoping Analysis Of The Impact Of SiC Cladding On Late-Phase Accident Progression Involving Core–Concrete Interaction

    Energy Technology Data Exchange (ETDEWEB)

    Farmer, M. T. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2015-11-01

    The overall objective of the current work is to carry out a scoping analysis to determine the impact of ATF on late phase accident progression; in particular, the molten core-concrete interaction portion of the sequence that occurs after the core debris fails the reactor vessel and relocates into containment. This additional study augments previous work by including kinetic effects that govern chemical reaction rates during core-concrete interaction. The specific ATF considered as part of this study is SiC-clad UO2.

  8. Scope Definition

    DEFF Research Database (Denmark)

    Bjørn, Anders; Owsianiak, Mikołaj; Laurent, Alexis

    2018-01-01

    The scope definition is the second phase of an LCA. It determines what product systems are to be assessed and how this assessment should take place. This chapter teaches how to perform a scope definition. First, important terminology and key concepts of LCA are introduced. Then, the nine items...... making up a scope definition are elaborately explained: (1) Deliverables. (2) Object of assessment, (3) LCI modelling framework and handling of multifunctional processes, (4) System boundaries and completeness requirements, (5) Representativeness of LCI data, (6) Preparing the basis for the impact...... assessment, (7) Special requirements for system comparisons, (8) Critical review needs and (9) Planning reporting of results. The instructions relate both to the performance and reporting of a scope definition and are largely based on ILCD....

  9. Advanced system demonstration for utilization of biomass as an energy source. Volume I. Scope and design criteria and project summary

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-01

    The information in this document is the result of an intensive engineering effort to demonstrate the feasibility of biomass-fueled boilers in cogeneration applications. This design package is based upon a specific site in the State of Maine. However, the design is generic in nature and could serve as a model for other biomass conversion facilities located anywhere biomass is abundant. The project's purpose and summary information are presented: the plant, its concept of operation; and other overall information are described. The capital cost estimate for the plant, and the basis upon which it was obtained are given; a schedule of key milestones and activities required to construct the plant and put it into operation is presented; and the general findings in areas that affect the viability of the project are discussed. The technical design, biomass study, environmental impact, commercialization, and economic factors are addressed. Each major plant area and the equipment and facilities that each includes are discussed in depth. Some overall plant requirements, including noise control, reliability, maintainability, and safety, are detailed. The results of each study relating to alternatives considered for optimizing plant operation parameters and specific system process schemes are briefly presented. All economic factors that affect the feasibility and viability of the biomass project are defined and evaluated.

  10. Experience and meaning of user involvement: some explorations from a community mental health project.

    Science.gov (United States)

    Truman, Carole; Raine, Pamela

    2002-05-01

    With an increased interest in and policy commitment to involving service users in the planning and delivery of health service provision, there is a clear need to explore both the rhetoric and realities of what user involvement entails. In the present paper, by drawing upon an evaluation of a community-based exercise facility for people with mental health problems, the authors explore ways in which the reality of user involvement is subject to a range of configurations within health services. The paper describes a piece of qualitative research that was undertaken within a participatory framework to explore the nature of user involvement within the facility. The data have been analysed using a grounded theory approach to provide insights into: the organisational context in which user involvement takes place; factors which encourage meaningful participation on the part of service users; perceived barriers to user involvement; and issues of sustainability and continuity. This research approach has enabled the authors to explore the views and experiences of users, service providers and referral agencies in relation to the nature and potential for user involvement. The findings illustrate ways in which user involvement may take place under both flexible and formal arrangements across a variety of activities. The present paper provides an account of some of the meanings and experiences of what 'successful' user participation may involve and the conditions which underpin 'success'. The authors conclude that successful and meaningful user involvement should enable and support users to recognise their existing skills, and to develop new ones, at a pace that suits their particular circumstances and personal resources. This process may require adaptation not only by organisations, but also by service providers and non-involved users.

  11. Developments of STR project in the scope of teleoperation handling robotic for the operation in Spanish nuclear facilities

    International Nuclear Information System (INIS)

    Bielza, M.; Gomez Santamaria, J.; Izquierdo, J.A.; Martinez, S.; Linares, F.; Avello, A.; Gago, M.J.

    1998-01-01

    The main objective of the Teleoperated Robotic Systems project (SRT) is the development of teleoperated robotic systems for use in the inspection, surveillance and maintenance operations in nuclear and radioactive installations. These systems make possible the reduction of the individual and collective doses of the workers that undertake these operations, as well as an increase of plant availability as it is possible to carry out specific tasks of inspection and surveillance in high radiation dose areas without having to reduce the power of the installation. This project started in 1995, deciding to priorize the inspection equipment in a first phase. When this work were advanced, the development of the manipulation activities was carried out to being consider the nuclear installations needs. As a result of this work, the manipulation requirements were elaborated in order to prepare the beginning technical specifications to design the equipment s. These developments are based on a fixed manipulator which is located closed to the equipment that we want to repair, and an arm manipulator which moves by caterpillars, it is easier to control than others; and the navigation system which allows the robot self-locating in the complex area. In this paper the conclusions about the manipulation requirements are described, as well as the state of the manipulation prototype. (Author)

  12. Scoping review and evaluation of SMS/text messaging platforms for mHealth projects or clinical interventions.

    Science.gov (United States)

    Iribarren, Sarah J; Brown, William; Giguere, Rebecca; Stone, Patricia; Schnall, Rebecca; Staggers, Nancy; Carballo-Diéguez, Alex

    2017-05-01

    Mobile technology supporting text messaging interventions (TMIs) continues to evolve, presenting challenges for researchers and healthcare professionals who need to choose software solutions to best meet their program needs. The objective of this review was to systematically identify and compare text messaging platforms and to summarize their advantages and disadvantages as described in peer-reviewed literature. A scoping review was conducted using four steps: 1) identify currently available platforms through online searches and in mHealth repositories; 2) expand evaluation criteria of an mHealth mobile messaging toolkit and integrate prior user experiences as researchers; 3) evaluate each platform's functions and features based on the expanded criteria and a vendor survey; and 4) assess the documentation of platform use in the peer-review literature. Platforms meeting inclusion criteria were assessed independently by three reviewers and discussed until consensus was reached. The PRISMA guidelines were followed to report findings. Of the 1041 potentially relevant search results, 27 platforms met inclusion criteria. Most were excluded because they were not platforms (e.g., guides, toolkits, reports, or SMS gateways). Of the 27 platforms, only 12 were identified in existing mHealth repositories, 10 from Google searches, while five were found in both. The expanded evaluation criteria included 22 items. Results indicate no uniform presentation of platform features and functions, often making these difficult to discern. Fourteen of the platforms were reported as open source, 10 focused on health care and 16 were tailored to meet needs of low resource settings (not mutually exclusive). Fifteen platforms had do-it-yourself setup (programming not required) while the remainder required coding/programming skills or setups could be built to specification by the vendor. Frequently described features included data security and access to the platform via cloud-based systems. Pay

  13. Contracting communities: Conceptualizing Community Benefits Agreements to improve citizen involvement in urban development projects

    NARCIS (Netherlands)

    Janssen-Jansen, Leonie; Veen, van der Menno

    2017-01-01

    Contractual agreements are becoming increasingly important for city governments seeking to manage urban development. Contractual governance involves direct relations between the local state and different public and private actors and citizens. Although abundant literature exists on public–private

  14. Los Alamos National Laboratory Site Integrated Management plan, uranium 233 storage and disposition. Volume 1: Project scope and description

    International Nuclear Information System (INIS)

    Nielsen, J.B.; Erickson, R.

    1997-01-01

    This Site Integration Management plan provides the Los Alamos Response to the Defense Nuclear Facility Safety Board (DNFSB) Recommendation 97-1. This recommendation addresses the safe storage and management of the Departments uranium 233 ( 233 U) inventory. In the past, Los Alamos has used 233 U for a variety of different weapons related projects. The material was used at a variety of sites in varying quantities. Now, there is a limited need for this material and the emphasis has shifted from use to storage and disposition of the material. The Los Alamos program to address the DNFSB Recommendation 97-1 has two emphases. First, take corrective action to address near term deficiencies required to provide safe interim storage of 233 U. Second, provide a plan to address long term storage and disposition of excess inventory at Los Alamos

  15. 31 CFR 537.412 - Investments in entities involved in economic development projects in Burma.

    Science.gov (United States)

    2010-07-01

    ... economic development projects in Burma. 537.412 Section 537.412 Money and Finance: Treasury Regulations... economic development of resources located in Burma is prohibited by § 537.204 where the company's profits are predominantly derived from the company's economic development of resources located in Burma. (b...

  16. Assessing the Influence of Researcher-Partner Involvement on the Process and Outcomes of Participatory Research in Autism Spectrum Disorder and Neurodevelopmental Disorders: A Scoping Review

    Science.gov (United States)

    Jivraj, Jamil; Sacrey, Lori-Ann; Newton, Amanda; Nicholas, David; Zwaigenbaum, Lonnie

    2014-01-01

    Participatory research aims to increase the relevance and broaden the implementation of health research by involving those affected by the outcomes of health studies. Few studies within the field of neurodevelopmental disorders, particularly autism spectrum disorders, have involved autistic individuals as partners. This study sought to identify…

  17. Science teachers' meaning-making when involved in a school-based professional development project

    DEFF Research Database (Denmark)

    Nielsen, Birgitte Lund

    2012-01-01

    A group of teachers’ meaning-making when they are collaboratively analyzing artifacts from practice in local science classrooms in a school-based professional development (PD) project is examined through repeated interviews and represented as meaning-making maps. The interpretation of the teachers......’ meaningmaking includes both their reference to outcomes from the project and their expressed ideas about teaching and learning of science. All four teachers refer to experiences from experimenting in their classrooms and interpret the collected artifacts in relation to students’ learning. Furthermore, they all...... felt encouraged to continue collaboration around science. During the interviews, the teachers emphasize various elements apparently connected to concrete challenges they each experience in their professional work. Implications in relation to the design of PD are discussed....

  18. Science teachers' meaning-making when involved in a school-based professional development project

    DEFF Research Database (Denmark)

    Nielsen, Birgitte Lund

    2012-01-01

    A group of teachers' meaning-making when they are collaboratively analyzing artifacts from practice in local science classrooms in a school-based professional development (PD) project is examined through repeated interviews and represented as meaning-makig maps. The interpretation of the teachers......' meaning-making includes both their reference to outcomes from the project and their expressed ideas about teaching and learning of science. All four teachers refer to experiences from experimenting in their classrooms and interpret the collected artifacts in relation to students' learning. Furthermore......, they all felt encouraged to continue collaboration around science. During the interviews, the teachers emphasize various elements apparently connected to concrete challenges they each experience in their professional work. Implications in relation to the design of PD are discussed....

  19. Design, Utility, and History of the Colorado Adoption Project: Examples Involving Adjustment Interactions1

    OpenAIRE

    Rhea, Sally Ann; Bricker, Josh B.; Corley, Robin P.; DeFries, John C.; Wadsworth, Sally J.

    2013-01-01

    This paper describes the Colorado Adoption Project (CAP), a longitudinal study in behavioral development, and discusses how adoption studies may be used to assess genetic and environmental etiologies of individual differences for important developmental outcomes. Previous CAP research on adjustment outcomes in childhood and adolescence which found significant interactions, including gene-environment interactions, is reviewed. New research suggests mediating effects of menarche and religiosity...

  20. Involving patients in care decisions improves satisfaction: an outcomes-based quality improvement project.

    Science.gov (United States)

    Leff, Ellen W

    2004-05-01

    A home care agency used quality improvement processes to improve patient satisfaction survey ratings. The focus was on involving patients in decisions about their care. A multidisciplinary team developed creative strategies to increase staff awareness and enhance customer service skills, which had dramatic results.

  1. Balancing Autonomy Rights and Protection: Children's Involvement in a Child Safety Online Project

    Science.gov (United States)

    Ost, Suzanne

    2013-01-01

    Researchers who involve children in their research are faced with the challenge of choosing between differing theoretical approaches which can prioritise children's autonomy rights or their "vulnerability" and their need to be protected. Somewhat confusingly, ethical guidelines seem to reflect a combination of these approaches. Even when…

  2. Summary of case studies presented at the WPDD topical session on stakeholder involvement in decommissioning projects - november 14, 2005

    International Nuclear Information System (INIS)

    Metcalfe, Doug

    2006-01-01

    Full text of publication follows: Two case studies were presented on experiences with stakeholder involvement in decommissioning projects. The first paper described the development of the United Kingdom Atomic Energy Authority's (UKAEA) stakeholder involvement activities for the Dounreay Nuclear Reactor Test Establishment. The second paper presented the US Nuclear Regulatory Commission regulatory process for decommissioning that includes opportunities for public involvement. The presentation contrasted the stakeholder involvement for two commercial US nuclear power plants (NPPs) that completed decommissioning in 2005, the Trojan NPP and the Maine Yankee NPP. The two case studies highlighted the importance of involving stakeholders in decommissioning projects, and provide important lessons learned. The Dounreay case study demonstrated the UKAEA's determination and commitment to continuously improve its stakeholder engagement program. In 2002, the UKAEA set out to broaden its stakeholder program by improving both public understanding and participation. With regard to public understanding, the UKAEA committed to keep the public informed on decommissioning developments, and ensure that communication was in an understandable form. To improve participation, the UKAEA actively worked to identify and engage stakeholders. The UKAEA then made efforts to involve stakeholders in decision-making activities, including the use of stakeholder panels to discuss and consider options for specific aspects of the Dounreay decommissioning and site restoration plan. In 2004, the UKAEA commissioned an independent review of its stakeholder involvement program to assess the program's effectiveness and benchmark it against best practices. The program was found to be useful, and positive feedback was provided on the use of stakeholder panels and the UKAEA's determination to deliver a broad based and effective stakeholder strategy. Recommendations to UKAEA included involving stakeholders

  3. Summary report of the University of Manchester involvement in the Chemval project

    International Nuclear Information System (INIS)

    Chandratillake, M.R.; Newton, G.W.A.; Robinson, V.J.

    1991-01-01

    Chemval is an international geochemical exercise, which aims at applying and validating predictive computer programmes describing the chemistry of radionuclides in the geosphere. As a component of the CEC Mirage project - second phase (on migration of radionuclides in the geosphere), Chemval is carried out in the framework of the third Community R and D programme on radioactive waste management and storage (1985-89). It is jointly funded by the Commission of the European Communities and Her Majesty's Inspectorate of Pollution (UK Department of the Environment)

  4. Important considerations for feasibility studies in physical activity research involving persons with multiple sclerosis: a scoping systematic review and case study.

    Science.gov (United States)

    Learmonth, Yvonne C; Motl, Robert W

    2018-01-01

    Much research has been undertaken to establish the important benefits of physical activity in persons with multiple sclerosis (MS). There is disagreement regarding the strength of this research, perhaps because the majority of studies on physical activity and its benefits have not undergone initial and systematic feasibility testing. We aim to address the feasibility processes that have been examined within the context of physical activity interventions in MS. A systematic scoping review was conducted based on a literature search of five databases to identify feasibility processes described in preliminary studies of physical activity in MS. We read and extracted methodology from each study based on the following feasibility metrics: process (e.g. recruitment), resource (e.g. monetary costs), management (e.g. personnel time requirements) and scientific outcomes (e.g. clinical/participant reported outcome measures). We illustrate the use of the four feasibility metrics within a randomised controlled trial of a home-based exercise intervention in persons with MS. Twenty-five studies were identified. Resource feasibility (e.g. time and resources) and scientific outcomes feasibility (e.g. clinical outcomes) methodologies were applied and described in many studies; however, these metrics have not been systematically addressed. Metrics related to process feasibility (e.g. recruitment) and management feasibility (e.g. human and data management) are not well described within the literature. Our case study successfully enabled us to address the four feasibility metrics, and we provide new information on management feasibility (i.e. estimate data completeness and estimate data entry) and scientific outcomes feasibility (i.e. determining data collection materials appropriateness). Our review highlights the existing research and provides a case study which assesses important metrics of study feasibility. This review serves as a clarion call for feasibility trials that will

  5. Can the BestGrid Process Improve Stakeholder Involvement in Electricity Transmission Projects?

    Directory of Open Access Journals (Sweden)

    Nadejda Komendantova

    2015-08-01

    Full Text Available The European Union has set ambitious targets for deployment of renewable energy sources to reach goals of climate change mitigation and energy security policies. However, the current state of electricity transmission infrastructure is a major bottleneck for further scaling up of renewable energy in the EU. Several thousands of kilometers of new lines have to be constructed and upgraded to accommodate growing volumes of intermittent renewable electricity. In many countries, construction of electricity transmission projects has been delayed for several years due to concerns of local stakeholders. The innovative BESTGRID approach, reported here, brings together transmission system operators (TSOs and non-governmental organizations (NGOs to discuss and understand the nature of stakeholder concerns. This paper has three objectives: (1 to understand stakeholder concerns about the deployment of electricity transmission grids in four pilot projects according to five guiding principles: need, transparency, engagement, environment, and impacts on human health as well as benefits; (2 to understand how these principles can be addressed to provide a basis for better decision-making outcomes; and (3 to evaluate the BESTGRID process based on feedback received from stakeholders and the level of participation achieved according to the ladder of Arnstein. This paper goes beyond a discussion of “measures to mitigate opposition” to understand how dialogue between TSOs and the public—represented mainly by NGOs and policy-makers—might lead to a better decision-making process and more sustainable electricity transmission infrastructure deployment.

  6. Parent-adolescent joint projects involving leisure time and activities during the transition to high school.

    Science.gov (United States)

    Marshall, Sheila K; Young, Richard A; Wozniak, Agnieszka; Lollis, Susan; Tilton-Weaver, Lauree; Nelson, Margo; Goessling, Kristen

    2014-10-01

    Leisure research to date has generally overlooked planning and organizing of leisure time and activities between parents and adolescents. This investigation examined how a sample of Canadian adolescents and their parents jointly constructed and acted on goals related to adolescents' leisure time during the move from elementary to high school. Using the Qualitative Action-Project Method, data were collected over an 8-10 month period from 26 parent-adolescent dyads located in two urban sites, through video-taped conversations about leisure time, video recall interviews, and telephone monitoring interviews. Analysis of the data revealed that the joint projects of the 26 dyads could be grouped into three clusters: a) governance transfer or attempts to shift, from parent to adolescent, responsibility over academic demands, organizing leisure time, and safety with peers, b) balancing extra-curricular activities with family life, academics, and social activities, and c) relationship adjustment or maintenance. Crown Copyright © 2014. Published by Elsevier Ltd. All rights reserved.

  7. Ethics Review for a Multi-Site Project Involving Tribal Nations in the Northern Plains.

    Science.gov (United States)

    Angal, Jyoti; Petersen, Julie M; Tobacco, Deborah; Elliott, Amy J

    2016-04-01

    Increasingly, Tribal Nations are forming ethics review panels, which function separately from institutional review boards (IRBs). The emergence of strong community representation coincides with a widespread effort supported by the U.S. Department of Health & Human Services and other federal agencies to establish a single IRB for all multi-site research. This article underscores the value of a tribal ethics review board and describes the tribal oversight for the Safe Passage Study-a multi-site, community-based project in the Northern Plains. Our experience demonstrates the benefits of tribal ethics review and makes a strong argument for including tribal oversight in future regulatory guidance for multi-site, community-based research. © The Author(s) 2016.

  8. Medical Oversight, Educational Core Content, and Proposed Scopes of Practice of Wilderness EMS Providers: A Joint Project Developed by Wilderness EMS Educators, Medical Directors, and Regulators Using a Delphi Approach.

    Science.gov (United States)

    Millin, Michael G; Johnson, David E; Schimelpfenig, Tod; Conover, Keith; Sholl, Matthew; Busko, Jonnathan; Alter, Rachael; Smith, Will; Symonds, Jennifer; Taillac, Peter; Hawkins, Seth C

    2017-01-01

    A disparity exists between the skills needed to manage patients in wilderness EMS environments and the scopes of practice that are traditionally approved by state EMS regulators. In response, the National Association of EMS Physicians Wilderness EMS Committee led a project to define the educational core content supporting scopes of practice of wilderness EMS providers and the conditions when wilderness EMS providers should be required to have medical oversight. Using a Delphi process, a group of experts in wilderness EMS, representing educators, medical directors, and regulators, developed model educational core content. This core content is a foundation for wilderness EMS provider scopes of practice and builds on both the National EMS Education Standards and the National EMS Scope of Practice Model. These experts also identified the conditions when oversight is needed for wilderness EMS providers. By consensus, this group of experts identified the educational core content for four unique levels of wilderness EMS providers: Wilderness Emergency Medical Responder (WEMR), Wilderness Emergency Medical Technician (WEMT), Wilderness Advanced Emergency Medical Technician (WAEMT), and Wilderness Paramedic (WParamedic). These levels include specialized skills and techniques pertinent to the operational environment. The skills and techniques increase in complexity with more advanced certification levels, and address the unique circumstances of providing care to patients in the wilderness environment. Furthermore, this group identified that providers having a defined duty to act should be functioning with medical oversight. This group of experts defined the educational core content supporting the specific scopes of practice that each certification level of wilderness EMS provider should have when providing patient care in the wilderness setting. Wilderness EMS providers are, indeed, providing health care and should thus function within defined scopes of practice and with

  9. Involving stakeholders in the commissioning and implementation of fishery science projects: experiences from the U.K. Fisheries Science Partnership.

    Science.gov (United States)

    Armstrong, M J; Payne, A I L; Deas, B; Catchpole, T L

    2013-10-01

    Following from similar initiatives worldwide, the U.K.'s Fisheries Science Partnership (FSP) was established in 2003 to provide the fishing industry with opportunities to propose and participate in scientific studies in collaboration with fishery scientists. Key concepts were that most of the available funding would support industry participation, that industry, not scientists, would come up with the ideas for projects, and that commercial fishing vessels and fishing methods would be used to address specific concerns of the fishing industry in a scientifically controlled manner. Nearly 100 projects had been commissioned by March 2012, covering annual time-series surveys of stocks subject to traditional assessment, and ad hoc projects on, e.g. gear selectivity, discard survival, tagging and migration and fishery development. The extent to which the results of the projects have been used by stakeholders, fishery scientists and fishery managers at a national and E.U. level is evaluated, along with the degree of industry interest and involvement, and reasons are identified for successes or failures in the uptake of the results into management and policy. Finally, the question is posed whether the programme has been successful in improving the engagement of the fishing community in the science-management process and in fostering communication and greater trust between fishers, scientists and managers. © 2013 Crown Copyright. © 2013 The Fisheries Society of the British Isles.

  10. Midwifery students experience of teamwork projects involving mark-related peer feedback.

    Science.gov (United States)

    Hastie, Carolyn R; Fahy, Kathleen M; Parratt, Jenny A; Grace, Sandra

    2016-06-01

    Lack of teamwork skills among health care professionals endangers patients and enables workplace bullying. Individual teamwork skills are increasingly being assessed in the undergraduate health courses but rarely defined, made explicit or taught. To remedy these deficiencies we introduced a longitudinal educational strategy across all three years of the Bachelor of Midwifery program. To report on students' experiences of engaging in team based assignments which involved mark-related peer feedback. Stories of midwifery students' experiences were collected from 17 participants across the three years of the degree. These were transcribed and analysed thematically and interpreted using feminist collaborative conversations. Most participants reported being in well-functioning teams and enjoyed the experience; they spoke of 'we' and said 'Everyone was on Board'. Students in poorly functioning teams spoke of 'I' and 'they'. These students complained about the poor performance of others but they didn't speak up because they 'didn't want to make waves' and they didn't have the skills to be able to confidently manage conflict. All participants agreed 'Peer-related marks cause mayhem'. Teamwork skills should be specifically taught and assessed. These skills take time to develop. Students, therefore, should be engaged in a teamwork assignment in each semester of the entire program. Peer feedback should be moderated by the teacher and not directly related to marks. Crown Copyright © 2015. Published by Elsevier Ltd. All rights reserved.

  11. Sum rules and other properties involving resonance projection operators. [for optical potential description of electron scattering from atoms and ions

    Science.gov (United States)

    Berk, A.; Temkin, A.

    1985-01-01

    A sum rule is derived for the auxiliary eigenvalues of an equation whose eigenspectrum pertains to projection operators which describe electron scattering from multielectron atoms and ions. The sum rule's right-hand side depends on an integral involving the target system eigenfunctions. The sum rule is checked for several approximations of the two-electron target. It is shown that target functions which have a unit eigenvalue in their auxiliary eigenspectrum do not give rise to well-defined projection operators except through a limiting process. For Hylleraas target approximations, the auxiliary equations are shown to contain an infinite spectrum. However, using a Rayleigh-Ritz variational principle, it is shown that a comparatively simple aproximation can exhaust the sum rule to better than five significant figures. The auxiliary Hylleraas equation is greatly simplified by conversion to a square root equation containing the same eigenfunction spectrum and from which the required eigenvalues are trivially recovered by squaring.

  12. Department of Energy Programmatic Environmental Impact Statement (PEIS) scoping session

    International Nuclear Information System (INIS)

    1992-01-01

    The purpose of this programmatic environmental impact statement (PEIS) scoping meeting was: to present the ground water program so as to build some familiarity and understanding about the issue involved; and to get the Durango community's input. This report contains the presentations made by the project manager for the uranium mill tailings program, site manager for the Durango UMTRA site, manager of ground water hydrology, and includes comments made by local residents

  13. Scope and assignments of a consultant in the selection and construction of a nuclear power plant. Application to a project in Turkey

    International Nuclear Information System (INIS)

    Naigeon, J.; Menez, A.; Milliot, B.; Valentin, A.; Kutukcuoglu, A.; Sahin, S.

    1977-01-01

    The decision to be build the first nuclear power plant raises serious problems for certain countries, generally through lack of a sufficient number of specialists and of adequate experience to overcome the difficulties involved. The role of a consultant consists in making his knowledge and experience available to the future power plant operator, thus enabling him to make adequate and timely decisions and to build and operate the facility under optimum conditions. The consultant's assignments are determined case by case. Generally speaking, they concern the following aspects: assistance in making the fundamental choice; specific site investigations; preparation of the invitations to bid and bid evaluation; preparation of the final project; technical assistance throughout the manufacture of the equipment, the construction and the erection stages and also during the plant acceptance and start-up tests; safety analysis and participation in the preparation of the corresponding reports. To these assignments are added, where necessary, complementary studies such as: investigation of the problems involved in fuel procurement, management, storage and (or) reprocessing; cost estimation and financial planning; definition of operating staff training requirements. In addition, the consultant-operator relationship is of benefit to the latter through the transfer of technology which he can use in future projects. The paper analyses all these aspects in the light of the experience acquired during the performance of a contract, currently underway for the preparation of an invitation to bid for the construction of the first nuclear power plant (600MW(e)) to be ordered by the Turkish national electricity utility. (author)

  14. A Blended Learning Approach to Teaching Project Management: A Model for Active Participation and Involvement: Insights from Norway

    Directory of Open Access Journals (Sweden)

    Bassam A. Hussein

    2015-04-01

    Full Text Available The paper demonstrates and evaluates the effectiveness of a blended learning approach to create a meaningful learning environment. We use the term blended learning approach in this paper to refer to the use of multiple or hybrid instructional methods that emphasize the role of learners as contributors to the learning process rather than recipients of learning. Contribution to learning is attained by using in class gaming as pathways that ensure active involvement of learners. Using a blended learning approach is important in order to be able to address different learning styles of the target group. The approach was also important in order to be able to demonstrate different types of challenges, issues and competences needed in project management. Student evaluations of the course confirmed that the use of multiple learning methods and, in particular, in class gaming was beneficial and contributed to a meaningful learning experience.

  15. Department of Physics' Involvement of the Impact Testing Project of the High Speed Civil Transport Program (HSCT)

    Science.gov (United States)

    VonMeerwall, Ernst D.

    1994-01-01

    The project involved the impact testing of a kevlar-like woven polymer material, PBO. The purpose was to determine whether this material showed any promise as a lightweight replacement material for jet engine fan containment. The currently used metal fan containment designs carry a high drag penalty due to their weight. Projectiles were fired at samples of PBO by means of a 0.5 inch diameter Helium powered gun. The Initial plan was to encase the samples inside a purpose-built steel "hot box" for heating and ricochet containment. The research associate's responsibility was to develop the data acquisition programs and techniques necessary to determine accurately the impacting projectile's velocity. Beyond this, the Research Associate's duties include any physical computations, experimental design, and data analysis necessary.

  16. Scope selection and control

    International Nuclear Information System (INIS)

    Guglielmi, F.

    2011-01-01

    OPG is preparing for a 4-unit refurbishment program at Darlington later in this decade. Key efforts underway include the selection of the right refurbishment scope that will allow Darlington to achieve top-decile performance post-refurbishment. For this to be possible, it is imperative that (1) plant/equipment condition be well understood, (2) post-refurbishment performance objectives be clearly defined, and (3) regulatory and other risks be carefully assessed and mitigated. Significant engineering, operations and maintenance support is required to complete this phase of the project cycle.

  17. Potential Involvement of Draxin in the Axonal Projection of Cranial Nerves, Especially Cranial Nerve X, in the Chick Hindbrain.

    Science.gov (United States)

    Zhang, Sanbing; Cui, Huixian; Wang, Lei; Kang, Lin; Huang, Guannan; Du, Juan; Li, Sha; Tanaka, Hideaki; Su, Yuhong

    2016-07-01

    The appropriate projection of axons within the nervous system is a crucial component of the establishment of neural circuitry. Draxin is a repulsive axon guidance protein. Draxin has important functions in the guidance of three commissures in the central nervous system and in the migration of neural crest cells and dI3 interneurons in the chick spinal cord. Here, we report that the distribution of the draxin protein and the location of 23C10-positive areas have a strong temporal and spatial correlation. The overexpression of draxin, especially transmembrane draxin, caused 23C10-positive axon bundles to misproject in the dorsal hindbrain. In addition, the overexpression of transmembrane draxin caused abnormal formation of the ganglion crest of the IX and X cranial nerves, misprojection of some anti-human natural killer-1 (HNK-1)-stained structures in the dorsal roof of the hindbrain, and a simultaneous reduction in the efferent nerves of some motoneuron axons inside the hindbrain. Our data reveal that draxin might be involved in the fascicular projection of cranial nerves in the hindbrain. © 2016 The Histochemical Society.

  18. Market scope

    International Nuclear Information System (INIS)

    2002-01-01

    Nova Scotia's Energy Strategy is aimed at opening the electricity market to wholesale competition, allowing eligible wholesale customers (such as municipal distribution utilities) to buy their electricity from competitive sources. The Nova Scotia Electricity Marketplace Governance Committee (EMGC) is concerned that this will not promote long-term competition because these eligible customers form only a very small fraction (1.6 per cent) of the total electricity demand in the province. This report examines the possible extensions of competition beyond the minimum specified in the Energy Strategy. It also identifies approaches that the EMGC may consider, including other potential levels of competition and their associated issues. The report discussed the issue of implementing wholesale competition as it relates to unbundling of the transmission tariff from the cost of energy supply and from the cost of distribution in retail marketing. The stages of expanding the market scope were also described with reference to large industrial customers, medium industrial and large commercial customers, and small commercial and residential customers. The report states that it is unlikely that the transition to an open access transmission market will need to be reversed, as it is likely to be an essential component of any further development. The EMGC feels it could minimize future transition costs and promote future evolution of competition by recommending for an institutional and market structure that is compatible with a broader competitive market

  19. Scoping of flood hazard mapping needs for Kennebec County, Maine

    Science.gov (United States)

    Dudley, Robert W.; Schalk, Charles W.

    2006-01-01

    This report was prepared by the U.S. Geological Survey (USGS) Maine Water Science Center as the deliverable for scoping of flood hazard mapping needs for Kennebec County, Maine, under Federal Emergency Management Agency (FEMA) Inter-Agency Agreement Number HSFE01-05-X-0018. This section of the report explains the objective of the task and the purpose of the report. The Federal Emergency Management Agency (FEMA) developed a plan in 1997 to modernize the FEMA flood mapping program. FEMA flood maps delineate flood hazard areas in support of the National Flood Insurance Program (NFIP). FEMA's plan outlined the steps necessary to update FEMA's flood maps for the nation to a seamless digital format and streamline FEMA's operations in raising public awareness of the importance of the maps and responding to requests to revise them. The modernization of flood maps involves conversion of existing information to digital format and integration of improved flood hazard data as needed. To determine flood mapping modernization needs, FEMA has established specific scoping activities to be done on a county-by-county basis for identifying and prioritizing requisite flood-mapping activities for map modernization. The U.S. Geological Survey (USGS), in cooperation with FEMA and the Maine State Planning Office Floodplain Management Program, began scoping work in 2005 for Kennebec County. Scoping activities included assembling existing data and map needs information for communities in Kennebec County (efforts were made to not duplicate those of pre-scoping completed in March 2005), documentation of data, contacts, community meetings, and prioritized mapping needs in a final scoping report (this document), and updating the Mapping Needs Update Support System (MNUSS) Database or its successor with information gathered during the scoping process. The average age of the FEMA floodplain maps in Kennebec County, Maine is 16 years. Most of these studies were in the late 1970's to the mid 1980s

  20. Scoping of flood hazard mapping needs for Somerset County, Maine

    Science.gov (United States)

    Dudley, Robert W.; Schalk, Charles W.

    2006-01-01

    This report was prepared by the U.S. Geological Survey (USGS) Maine Water Science Center as the deliverable for scoping of flood hazard mapping needs for Somerset County, Maine, under Federal Emergency Management Agency (FEMA) Inter-Agency Agreement Number HSFE01-05-X-0018. This section of the report explains the objective of the task and the purpose of the report. The Federal Emergency Management Agency (FEMA) developed a plan in 1997 to modernize the FEMA flood mapping program. FEMA flood maps delineate flood hazard areas in support of the National Flood Insurance Program (NFIP). FEMA's plan outlined the steps necessary to update FEMA's flood maps for the nation to a seamless digital format and streamline FEMA's operations in raising public awareness of the importance of the maps and responding to requests to revise them. The modernization of flood maps involves conversion of existing information to digital format and integration of improved flood hazard data as needed. To determine flood mapping modernization needs, FEMA has established specific scoping activities to be done on a county-by-county basis for identifying and prioritizing requisite flood-mapping activities for map modernization. The U.S. Geological Survey (USGS), in cooperation with FEMA and the Maine State Planning Office Floodplain Management Program, began scoping work in 2005 for Somerset County. Scoping activities included assembling existing data and map needs information for communities in Somerset County (efforts were made to not duplicate those of pre-scoping completed in March 2005), documentation of data, contacts, community meetings, and prioritized mapping needs in a final scoping report (this document), and updating the Mapping Needs Update Support System (MNUSS) Database or its successor with information gathered during the scoping process. The average age of the FEMA floodplain maps in Somerset County, Maine is 18.1 years. Most of these studies were in the late 1970's to the mid 1980

  1. Managing the Challenges of Leadership in ERP Implementations: An Exploratory Study of the Leadership Challenges Encountered by Project Managers Involved in ERP Implementation Projects

    Science.gov (United States)

    Wanjagi, James K.

    2013-01-01

    Increasingly, organizations are conducting more Enterprise Resource Planning (ERP) projects in order to promote organizational efficiencies. Meanwhile, minimal research has been conducted on the leadership challenges faced by project managers during the ERP project implementations and how these challenges are managed. The existing project…

  2. Efficacy of a group-based multimedia HIV prevention intervention for drug-involved women under community supervision: project WORTH.

    Science.gov (United States)

    El-Bassel, Nabila; Gilbert, Louisa; Goddard-Eckrich, Dawn; Chang, Mingway; Wu, Elwin; Hunt, Tim; Epperson, Matt; Shaw, Stacey A; Rowe, Jessica; Almonte, Maria; Witte, Susan

    2014-01-01

    This study is designed to address the need for evidence-based HIV/STI prevention approaches for drug-involved women under criminal justice community supervision. We tested the efficacy of a group-based traditional and multimedia HIV/STI prevention intervention (Project WORTH: Women on the Road to Health) among drug-involved women under community supervision. We randomized 306 women recruited from community supervision settings to receive either: (1) a four-session traditional group-based HIV/STI prevention intervention (traditional WORTH); (2) a four-session multimedia group-based HIV/STI prevention intervention that covered the same content as traditional WORTH but was delivered in a computerized format; or (3) a four-session group-based Wellness Promotion intervention that served as an attention control condition. The study examined whether the traditional or multimedia WORTH intervention was more efficacious in reducing risks when compared to Wellness Promotion; and whether multimedia WORTH was more efficacious in reducing risks when compared to traditional WORTH. Primary outcomes were assessed over the 12-month post-intervention period and included the number of unprotected sex acts, the proportion of protected sex acts, and consistent condom use. At baseline, 77% of participants reported unprotected vaginal or anal sex (n = 237) and 63% (n = 194) had multiple sex partners. Women assigned to traditional or multimedia WORTH were significantly more likely than women assigned to the control condition to report an increase in the proportion of protected sex acts (β = 0.10; 95% CI = 0.02-0.18) and a decrease in the number of unprotected sex acts (IRR = 0.72; 95% CI = 0.57-0.90). The promising effects of traditional and multimedia WORTH on increasing condom use and high participation rates suggest that WORTH may be scaled up to redress the concentrated epidemics of HIV/STIs among drug-involved women in the criminal justice system. Clinical

  3. Scoping of flood hazard mapping needs for Cumberland County, Maine

    Science.gov (United States)

    Dudley, Robert W.; Schalk, Charles W.

    2006-01-01

    This report was prepared by the U.S. Geological Survey (USGS) Maine Water Science Center as the deliverable for scoping of flood hazard mapping needs for Cumberland County, Maine, under Federal Emergency Management Agency (FEMA) Inter-Agency Agreement Number HSFE01-05-X-0018. This section of the report explains the objective of the task and the purpose of the report. The Federal Emergency Management Agency (FEMA) developed a plan in 1997 to modernize the FEMA flood mapping program. FEMA flood maps delineate flood hazard areas in support of the National Flood Insurance Program (NFIP). FEMA's plan outlined the steps necessary to update FEMA's flood maps for the nation to a seamless digital format and streamline FEMA's operations in raising public awareness of the importance of the maps and responding to requests to revise them. The modernization of flood maps involves conversion of existing information to digital format and integration of improved flood hazard data as needed. To determine flood mapping modernization needs, FEMA has established specific scoping activities to be done on a county-by-county basis for identifying and prioritizing requisite flood-mapping activities for map modernization. The U.S. Geological Survey (USGS), in cooperation with FEMA and the Maine State Planning Office Floodplain Management Program, began scoping work in 2005 for Cumberland County. Scoping activities included assembling existing data and map needs information for communities in Cumberland County, documentation of data, contacts, community meetings, and prioritized mapping needs in a final scoping report (this document), and updating the Mapping Needs Update Support System (MNUSS) Database or its successor with information gathered during the scoping process. The average age of the FEMA floodplain maps in Cumberland County, Maine is 21 years. Most of these studies were in the early to mid 1980s. However, in the ensuing 20-25 years, development has occurred in many of the

  4. Scope Management of Non-Functional Requirements

    NARCIS (Netherlands)

    Kassab, M.; Daneva, Maia; Ormandjieva, O.; Mueller, P.; Lyggesmeyer, P.; Maehle, E.

    2007-01-01

    In order to meet commitments in software projects, a realistic assessment must be made of project scope. Such an assessment relies on the availability of knowledge on the user-defined project requirements and their effort estimates and priorities, as well as their risk. This knowledge enables

  5. The Effect of Technical Assistance on Involvement and Use: The Case of a Research, Evaluation, and Technical Assistance Project

    Science.gov (United States)

    Roseland, Denise; Volkov, Boris B.; Callow-Heusser, Catherine

    2011-01-01

    In contrast to typical National Science Foundation program evaluations, the Utah State Math Science Partnership-Research, Evaluation and Technical Assistance Project (MSP-RETA) provided technical assistance (TA) in two forms: direct TA for up to 10 projects a year, and professional development sessions for a larger number of project staff. Not…

  6. Summary of stakeholder engagement session of WPDD topical session on stakeholder involvement in decommissioning projects - November 14, 2005

    International Nuclear Information System (INIS)

    Chandler, Steve

    2006-01-01

    as important as technical rigour in these documents. The Italian presentation mentioned setting up a bilateral agreement on monitoring with local authorities. This seems like a step in the right direction, but the FSC would recommend far more than that to build public confidence. Today the public expects to be directly involved in decision making on major issues that affect them, not just via elected representatives. As I mentioned in my presentation on the situation in the UK, it is also important not to raise unrealistic expectations of how much the public can influence our decisions. In much UK legislation, decisions can only be made on a strictly technical basis and the opportunity for public influence is very limited. The presentation by EDF highlighted another vital requirement for successful stakeholder engagement. That is a disciplined, project based approach within the leading organizations. If stakeholder engagement is not meticulously planned it will flat on its face, as people will be given different messages at different times. So it is very important that this disciplined approach includes both local and national players to ensure consistency. Finally, the presentation from Germany mentioned the stepwise approach to decision making. This is very much in line with FSC recommendations. It is important that stakeholders are involved right from the start of the process, and not just in the final site selection stage. The steps involved in reaching a decision must be transparent and the opportunity for stakeholder involvement in each one needs to be clear. If the legal and procedural framework incorporate this stepwise approach explicitly it is a great help for stakeholder participation

  7. The involvement of student teachers in the development of language learning tasks. Lessons from the ETALAGE project

    NARCIS (Netherlands)

    Koet, T.; Žogla, I.; Rutka, L.

    2012-01-01

    In this paper I report a small experiment about the involvement of student teachers as well as experienced professionals in the development of language learning tasks. I argue that involving student teachers as well as experienced professionals may yield better results than involving experienced

  8. A Collaborative Approach to Defining the Usefulness of Impact: Lessons from a Knowledge Exchange Project Involving Academics and Social Work Practitioners

    Science.gov (United States)

    Wilkinson, Heather; Gallagher, Michael; Smith, Mark

    2012-01-01

    This paper reports on a knowledge exchange project involving academics and practitioners in six local authority social work departments. It contributes to recent debates about the coproduction of knowledge, presenting findings in three key areas: the importance of relationships for knowledge exchange; "what works" for practitioners…

  9. The realization of three special photovoltaic (PV) pilot projects. The roles and learning experiences of parties involved

    International Nuclear Information System (INIS)

    Geuzendam, C.; Van Mierlo, B.

    1995-11-01

    Experiences with the following three demonstration projects, carried out in the Netherlands, are inventorized and evaluated: (1) 16 private grid-connected PV-systems in existing houses within the framework of the project of the Organization for Renewable Energy (ODE, abbreviated in Dutch); (2) five private grid-connected roof-integrated PV-systems in renovated buildings in Leiden; and (3) the integration of PV in an acoustic baffle along the high-way A-27 near De Bilt. Attention is paid to the decision making processes, the most important actors, the management of the projects and what is learned from the experiences

  10. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  11. Methodology for the selection of routes for international cross-border line projects involving multiple objectives and decision-makers in the analyses of restrictions and environmental possibilities

    International Nuclear Information System (INIS)

    Angel S, Enrique; Cadena, Luis Fernando

    2005-01-01

    A scheme was developed and applied to select the optimum environmental route for international cross-border line projects, in a decision making context involving multiple objectives and multiple decision-makers, the project studied was the electricity interconnection for central America (SIEPAC) for which a prospective assessment was carried out regarding the restrictions and possibilities in the light of the Colombian environmental dimensions management model. The methodology proposed followed these stages: Definition and approval of the structure of environmental restriction and criticality variables, sectorization and selection of complex sections, definition of decision-makers for multi-objective analysis; design and application of consultation tool; definition and modeling of options applying SIG; sensitivity analysis of alternative routes and project's environment management. Different options were identified for insertion and permanence of the project according to the criteria of various interest groups and actors consulted: environmental authorities, electricity companies, scientific community and civil society

  12. Quantification of the ex-vessel severe accident risks for the Swedish boiling water reactors. A scoping study performed for the APRI project

    International Nuclear Information System (INIS)

    Okkonen, T.; Dinh, T.N.; Bui, V.A.; Sehgal, B.R.

    1995-07-01

    Results of a scoping study to quantify the ex-vessel severe accident risks for the Swedish BWRs are reported. The study considers that a pool of water is established in the containment prior to vessel failure, as prescribed by the accident management scheme for the newer Swedish BWRs. The integrated methodology developed and employed combines probabilistic and deterministic treatment of the various melt-structure-water interaction processes occurring in sequence. The potential steam explosion, and the melt attack on the containment basemat, are treated with enveloping analyses. Uncertain parameters in the models and the initial conditions are treated with Monte Carlo simulations. Independent models are developed for melt coolability and possible attack on the concrete basemat. It is found that, with current models, the melt discharge scenarios, in which a large amount of accumulated melt may be released from the vessel, could subject the containment to large steam explosion loads. However, the uncertainties are so large that no definite conclusion can be drawn. The assessment of ex-vessel core debris coolability is disturbed by similar phenomenological uncertainties. Presently, coolability of the core debris can not be demonstrated. 133 refs

  13. Quantification of the ex-vessel severe accident risks for the Swedish boiling water reactors. A scoping study performed for the APRI project

    Energy Technology Data Exchange (ETDEWEB)

    Okkonen, T; Dinh, T N; Bui, V A; Sehgal, B R [Royal Inst. of Tech., Stockholm (Sweden). Dept. of Energy Systems Technology

    1995-07-01

    Results of a scoping study to quantify the ex-vessel severe accident risks for the Swedish BWRs are reported. The study considers that a pool of water is established in the containment prior to vessel failure, as prescribed by the accident management scheme for the newer Swedish BWRs. The integrated methodology developed and employed combines probabilistic and deterministic treatment of the various melt-structure-water interaction processes occurring in sequence. The potential steam explosion, and the melt attack on the containment basemat, are treated with enveloping analyses. Uncertain parameters in the models and the initial conditions are treated with Monte Carlo simulations. Independent models are developed for melt coolability and possible attack on the concrete basemat. It is found that, with current models, the melt discharge scenarios, in which a large amount of accumulated melt may be released from the vessel, could subject the containment to large steam explosion loads. However, the uncertainties are so large that no definite conclusion can be drawn. The assessment of ex-vessel core debris coolability is disturbed by similar phenomenological uncertainties. Presently, coolability of the core debris can not be demonstrated. 133 refs.

  14. Patient Involvement in Geriatric Care – Results and Experiences from a Mixed Models Design Study within Project INTEGRATE

    Directory of Open Access Journals (Sweden)

    Joern Kiselev

    2018-02-01

    Full Text Available Introduction: Patient involvement is a core component of an integrated care approach. While the benefits and prerequisites of patient involvement have been described in general and additionally for some target populations, little is known about the views and experiences of older people regarding this matter. Methods: A study with a mixed-methods design was conducted to gain a better understanding about patient involvement in geriatric care. A questionnaire on shared decision-making was administered within a group of older adults in Germany. Additionally, 7 focus groups with health professionals and geriatric patients in Germany and Estonia were held to deepen the insight of the questionnaire and discussing experiences and barriers of patient involvement. Results: Older people without an actual medical problem expressed a significantly higher desire to participate in shared decisions than those requiring actual medical care. No significant differences could be found for the desire to be informed as part of the care process. No correlation between patients’ desire and experiences on shared decision-making could be observed. In the focus groups, patients demanded a comprehensive and understandable information and education process while the health professionals’ view was very task-specific. This conflict led to a loss of trust by the patients. Conclusions: There is a gap between patients’ and health professionals’ views on patient involvement in older people. The involvement process should therefore be comprehensive and should take into account different levels of health literacy.

  15. Involvement of Individuals in the Development of Technical Solutions and Rules of Management for Building Renovation Projects: A Case Study of Latvia

    Science.gov (United States)

    Pukite, I.; Grekis, A.; Geipele, I.; Zeltins, N.

    2017-08-01

    In March 2016, the Latvian government approved a new support program for increasing energy efficiency in residential apartment buildings. For the support of renovation of apartment buildings in the period from 2016 to 2023, 166 470 588 EUR will be available. Different persons, such as energy auditors, designers, architects, project managers and builders, will be involved in the process of planning, development and implementation of building renovation. At the development stage of the building renovation project, special attention should be devoted to the first stage - energy audit and technical project development. The problem arises due to the fact that each of these individuals, during the development of technical building documentation, does not work as a completely unified system. The implementation of construction project planning and organisational management system is one of the most important factors to guarantee that the quality of building renovation project is ensured in accordance with the laws and regulatory standards. The paper studies mutual cooperation, professionalism and the role of information feedback of personnel involved in the planning stage of building renovation, which is an essential prerequisite for the renovation process in order to achieve high quality of work and reduce the energy performance indicator. The present research includes the analysis of different technical solutions and their impact on energy efficiency. Mutual harmonisation of technical specifications is also investigated.

  16. Plant specific basic principle simulator as a first step to plant specific full scope simulator

    International Nuclear Information System (INIS)

    Krajnc, B.; Pribozic, F.; Novsak, M.

    1996-01-01

    Nuklearna Elektrarna Krsko (NEK) decided to enhance the quality and scope of initial training of NEK technical personnel, mainly in so called Phase 1 and 2 of training for licensed personnel. This training is a prerequisite for further training on the full scope simulator for future operators and is also given to larger number of engineers, working in different important areas where thorough knowledge of nuclear technology and plant systems is required. Due to that it was decided that plant specific Basis Principle Simulators (BPS) should be developed. The other important reason for such decision was an indication that NEK specific full scope simulator will have to be purchased. Based on that it was concluded that BPS should serve as a good opportunity to learn about the state of the art approaches in the modeling area, to see in which direction development of software in conjunction with state of the art hardware is going and in particular to the extent possible verify the existence of required plant documentation in support BPS and later plant specific full scope simulator. In this paper the scope of NEK BPS simulation, experience in initial data gathering, experience with know-how transfer based on direct involvement of NEK and Izobrazevalni Center za Jedrsko Tehnnologijo (ICJT) personnel in modeling of instrumentation and control will be presented. Lessons learned, particularly in light of coming project for NEK full scope simulator, will also be addressed. The future use of the BPS in the NEK training programs will be described. It can be concluded that due to very complex technology, phase approaches in training of key NEK technical personnel, the development of NEK plant specific BPS is justifiable, regardless of the fact that NEK will also obtain specific full scope simulator. It has to be pointed out that BPS can not be supplement for plant specific full scope simulator, due to number of reasons discussed in the paper. (author)

  17. Health Advocacy Project: Evaluating the Benefits of Service Learning to Nursing Students and Low Income Individuals Involved in a Community-Based Mental Health Promotion Project.

    Science.gov (United States)

    Samuels-Dennis, Joan; Xia, Liudi; Secord, Sandra; Raiger, Amelia

    2016-10-08

    Poverty, along with other factors such as unemployment, work and life stressors, interpersonal violence, and lack of access to high quality health and/or social services all play a role in determining who develops a mental illness and for whom those symptoms persist or worsen. Senior nursing student preparing to enter the field and working in a service learning capacity may be able to influence early recovery and symptom abatement among those most vulnerable to mental illness. A consortium of community stakeholders and researchers collaboratively designed a 10-week mental health promotion project called the Health Advocacy Project (HAP). The project combines case management and system navigation support delivered by trained and highly supervised nursing students to individuals experiencing major depressive disorder (MDD) and/or post-traumatic stress disorder (PTSD). In this article, we present the findings of a qualitative fidelity evaluation that examines the effectiveness of nursing students in delivering the health advocacy intervention at the level and with the intensity originally intended. The findings demonstrate how the services of senior nursing students may be optimized to benefit our healthcare system and populations most at risk for developing MDD and PTSD.

  18. Focus groups as a tool to collect data in a community informatics project involving elderly rural women

    CSIR Research Space (South Africa)

    Smith, R

    2015-11-01

    Full Text Available The main purpose of the extended project is to identify and investigate the aspects that will encourage elderly women in rural areas to use the ICT platform, and to determine what the physical design, content and applications should look like...

  19. Study of Bilingual-Bicultural Projects Involving Native American, Indo-European, Asian and Pacific Language Groups.

    Science.gov (United States)

    Battiste, Marie A.; And Others

    This is the final report of one of three studies in an overall project entitled "Evaluation of Bilingual Education Programs." This study was sponsored in response to a need for more information regarding bilingual-bicultural education for other than Spanish language groups. The study's objectives were to: (1) identify the major issues…

  20. Campus Community Involvement in an Experimental Food Research Project Increases Students' Motivation and Improves Perceived Learning Outcomes

    Science.gov (United States)

    Goto, K.; Bianco-Simeral, S.

    2009-01-01

    Although the effects of pedagogical strategies using collaborative learning on students' perceived learning outcomes have been studied, little has been examined about possible benefits and challenges in collaborating with the campus community in a food science research project conducted by nutrition majors. We examined the effects of involving…

  1. Project management for profit a failsafe guide to keeping projects on track and on budget

    CERN Document Server

    Knight, Joe; Angus, Brad; Case, John

    2012-01-01

    If your work involves projects, then this book is for you. It will show every company owner and project manager—at businesses large and small—how to run projects differently. You’ll benefit if you’ve ever: • been over budget on a project • exceeded a timeline on a project • worked on a project that completely stalled as you neared the finish line • lost money on a sure-thing project and had no idea why • noticed that scope and feature creep held you back • watched a project take three times as long as planned • felt too embarrassed to perform a review of your successes and failures • wondered whether your project actually made any money By the time you finish the book, you’ll be ready to implement Project Management for Profit in your own company—and be prepared to keep your projects on track and on budget.

  2. COMPAS: a European project on the ''comparison of alternative waste management strategies for long-lived radioactive wastes''. Scope, working methods and conclusions

    International Nuclear Information System (INIS)

    Dutton, L.M.C.; Hillis, Z.K.; Roehlig, K.J.

    2004-01-01

    The paper presents the content and major findings of a project on the ''COMParison of Alternative waste management Strategies for long-lived radioactive wastes'' (COMPAS) carried out within the 5 th framework programme of the European commission. Under the leadership of NNC (UK), the project was carried out by individuals representing waste management organisations from 15 European countries. After having compiled information on the nature and amount of long-lived radioactive waste to be managed, issues influencing the selection of waste management strategies and options, presently adopted national strategies as well as options for the future were addressed. Conclusions concerning key issues for the success or otherwise of strategies and management solutions were drawn. (orig.)

  3. Wind Speed Estimation and Parametrization of Wake Models for Downregulated Offshore Wind Farms within the scope of PossPOW Project

    DEFF Research Database (Denmark)

    Göçmen Bozkurt, Tuhfe; Giebel, Gregor; Poulsen, Niels Kjølstad

    2014-01-01

    With increasing installed capacity, wind farms are requested to downregulate more frequently, especially in the offshore environment. Determination and verification of possible (or available) power of downregulated offshore wind farms are the aims of the PossPOW project (see PossPOW.dtu.dk). Two ...... period. The re-calibrated model has to be further parametrized to include dynamic effects such as wind direction variability and meandering also considering different averaging time scales before implemented in full scale wind farms....

  4. Identification of retinal ganglion cells and their projections involved in central transmission of information about upward and downward image motion.

    Directory of Open Access Journals (Sweden)

    Keisuke Yonehara

    Full Text Available The direction of image motion is coded by direction-selective (DS ganglion cells in the retina. Particularly, the ON DS ganglion cells project their axons specifically to terminal nuclei of the accessory optic system (AOS responsible for optokinetic reflex (OKR. We recently generated a knock-in mouse in which SPIG1 (SPARC-related protein containing immunoglobulin domains 1-expressing cells are visualized with GFP, and found that retinal ganglion cells projecting to the medial terminal nucleus (MTN, the principal nucleus of the AOS, are comprised of SPIG1+ and SPIG1(- ganglion cells distributed in distinct mosaic patterns in the retina. Here we examined light responses of these two subtypes of MTN-projecting cells by targeted electrophysiological recordings. SPIG1+ and SPIG1(- ganglion cells respond preferentially to upward motion and downward motion, respectively, in the visual field. The direction selectivity of SPIG1+ ganglion cells develops normally in dark-reared mice. The MTN neurons are activated by optokinetic stimuli only of the vertical motion as shown by Fos expression analysis. Combination of genetic labeling and conventional retrograde labeling revealed that axons of SPIG1+ and SPIG1(- ganglion cells project to the MTN via different pathways. The axon terminals of the two subtypes are organized into discrete clusters in the MTN. These results suggest that information about upward and downward image motion transmitted by distinct ON DS cells is separately processed in the MTN, if not independently. Our findings provide insights into the neural mechanisms of OKR, how information about the direction of image motion is deciphered by the AOS.

  5. EU-level competence development projects in agri-food-environment: the involvement of sectoral social partners

    NARCIS (Netherlands)

    Mulder, M.

    2006-01-01

    Purpose - The European Commission and social partner organisations at EU level encourage the lifelong development of qualifications and competence. This is reflected in many policy reports and reviews. This paper seeks to show the involvement of social partner organisations at the level of EU-funded

  6. [Drug use and involvement in risky driving styles in a sample of university students. The uniHcos project].

    Science.gov (United States)

    Jiménez-Mejías, Eladio; Medina-García, Miguel Ángel; Martínez-Ruiz, Virginia; Pulido-Manzanero, José; Fernández-Villa, Tania

    2015-09-01

    Drug and alcohol use are known to increase the risk of traffic accidents, especially among youth. However, the association between habitual drug use and the adoption of risky driving behavior is not well known. The aim of this study was to identify and quantify the association between habitual drug use and involvement in risky driving practices overall and by gender among university students. A cross sectional study was conducted. The study population was composed of 559 car drivers younger than 31 years who completed an online questionnaire during the 2011-2012 academic year. Among other factors, the questionnaire assessed the following items: habitual drug consumption (20 or more days) during the last year and involvement in other risky driving practices during the last month. A total of 27.7% of students reported they had used drugs regularly during the last year. Drug use was associated with a higher frequency of involvement in risky driving practices. In men, the factors most strongly associated with drug consumption were speeding, driving under influence of alcohol, and feeling drowsy while driving. In women, drug consumption was mainly associated with smoking while driving, drunk driving, and driving without rest. The results of our study support the hypothesis that habitual drug use is associated with an increased frequency of risky driving behavior. Copyright © 2014 SESPAS. Published by Elsevier Espana. All rights reserved.

  7. 16 CFR 1031.9 - Purpose and scope.

    Science.gov (United States)

    2010-01-01

    ... Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION GENERAL COMMISSION PARTICIPATION AND COMMISSION EMPLOYEE INVOLVEMENT IN VOLUNTARY STANDARDS ACTIVITIES Employee Involvement § 1031.9 Purpose and scope. (a) This subpart sets forth the Consumer Product Safety Commission's criteria and requirements governing...

  8. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  9. Networked Microgrids Scoping Study

    Energy Technology Data Exchange (ETDEWEB)

    Backhaus, Scott N. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Dobriansky, Larisa [General MicroGrids, San Diego, CA (United States); Glover, Steve [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Liu, Chen-Ching [Washington State Univ., Pullman, WA (United States); Looney, Patrick [Brookhaven National Lab. (BNL), Upton, NY (United States); Mashayekh, Salman [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Pratt, Annabelle [National Renewable Energy Lab. (NREL), Golden, CO (United States); Schneider, Kevin [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Stadler, Michael [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Starke, Michael [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Wang, Jianhui [Argonne National Lab. (ANL), Argonne, IL (United States); Yue, Meng [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2016-12-05

    Much like individual microgrids, the range of opportunities and potential architectures of networked microgrids is very diverse. The goals of this scoping study are to provide an early assessment of research and development needs by examining the benefits of, risks created by, and risks to networked microgrids. At this time there are very few, if any, examples of deployed microgrid networks. In addition, there are very few tools to simulate or otherwise analyze the behavior of networked microgrids. In this setting, it is very difficult to evaluate networked microgrids systematically or quantitatively. At this early stage, this study is relying on inputs, estimations, and literature reviews by subject matter experts who are engaged in individual microgrid research and development projects, i.e., the authors of this study The initial step of the study gathered input about the potential opportunities provided by networked microgrids from these subject matter experts. These opportunities were divided between the subject matter experts for further review. Part 2 of this study is comprised of these reviews. Part 1 of this study is a summary of the benefits and risks identified in the reviews in Part 2 and synthesis of the research needs required to enable networked microgrids.

  10. Ghrelin fibers from lateral hypothalamus project to nucleus tractus solitaries and are involved in gastric motility regulation in cisplatin-treated rats.

    Science.gov (United States)

    Gong, Yanling; Liu, Yang; Liu, Fei; Wang, Shasha; Jin, Hong; Guo, Feifei; Xu, Luo

    2017-03-15

    Ghrelin can alleviate cancer chemotherapy-induced dyspepsia in rodents, though the neural mechanisms involved are not known. Therefore, ghrelin projections from the lateral hypothalamus (LH) and its involvement in the regulation of gastric motility in cisplatin-treated rats were investigated with a multi-disciplined approach. Retrograde tracing combined with fluoro-immunohistochemical staining were used to investigate ghrelin fiber projections arising from LH and projecting to nucleus tractus solitaries (NTS). Results revealed that ghrelin fibers originating in LH project to NTS. Expression of ghrelin and its receptor growth hormone secretagogue receptor (GHS-R1a) in LH and NTS were detected by Western Blot. 2days after cisplatin dosing, expression of ghrelin in LH decreased while GHS-R1a in both LH and NTS increased. In electrophysiological experiments, the effects of N-methyl-d-aspartate (NMDA) microinjection in LH on neuronal discharge of gastric distension-responsive neurons in NTS and gastric motility were assessed. NMDA in LH excited most of ghrelin-responsive gastric distension (GD)-sensitive neurons in NTS and promoted gastric motility. This effect was partially blocked by ghrelin antibody in NTS. Furthermore, the excitatory effects of NMDA in cisplatin-treated rats were weaker than those in saline-treated rats. Behaviorally, cisplatin induced a significant increase of kaolin consumption and decrease of food intake. These studies reveal a decreased expression of ghrelin in LH and up-regulation of GHS-R1a in LH and NTS, which are involved in the regulation of GD neuronal discharge in NTS and gastric motility. Copyright © 2017 Elsevier B.V. All rights reserved.

  11. Improving brain computer interface research through user involvement - The transformative potential of integrating civil society organisations in research projects

    Science.gov (United States)

    Wakunuma, Kutoma; Rainey, Stephen; Hansen, Christian

    2017-01-01

    Research on Brain Computer Interfaces (BCI) often aims to provide solutions for vulnerable populations, such as individuals with diseases, conditions or disabilities that keep them from using traditional interfaces. Such research thereby contributes to the public good. This contribution to the public good corresponds to a broader drive of research and funding policy that focuses on promoting beneficial societal impact. One way of achieving this is to engage with the public. In practical terms this can be done by integrating civil society organisations (CSOs) in research. The open question at the heart of this paper is whether and how such CSO integration can transform the research and contribute to the public good. To answer this question the paper describes five detailed qualitative case studies of research projects including CSOs. The paper finds that transformative impact of CSO integration is possible but by no means assured. It provides recommendations on how transformative impact can be promoted. PMID:28207882

  12. Improving brain computer interface research through user involvement - The transformative potential of integrating civil society organisations in research projects.

    Science.gov (United States)

    Stahl, Bernd Carsten; Wakunuma, Kutoma; Rainey, Stephen; Hansen, Christian

    2017-01-01

    Research on Brain Computer Interfaces (BCI) often aims to provide solutions for vulnerable populations, such as individuals with diseases, conditions or disabilities that keep them from using traditional interfaces. Such research thereby contributes to the public good. This contribution to the public good corresponds to a broader drive of research and funding policy that focuses on promoting beneficial societal impact. One way of achieving this is to engage with the public. In practical terms this can be done by integrating civil society organisations (CSOs) in research. The open question at the heart of this paper is whether and how such CSO integration can transform the research and contribute to the public good. To answer this question the paper describes five detailed qualitative case studies of research projects including CSOs. The paper finds that transformative impact of CSO integration is possible but by no means assured. It provides recommendations on how transformative impact can be promoted.

  13. Aerodynamic Drag Scoping Work.

    Energy Technology Data Exchange (ETDEWEB)

    Voskuilen, Tyler [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Erickson, Lindsay Crowl [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Knaus, Robert C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2018-02-01

    This memo summarizes the aerodynamic drag scoping work done for Goodyear in early FY18. The work is to evaluate the feasibility of using Sierra/Low-Mach (Fuego) for drag predictions of rolling tires, particularly focused on the effects of tire features such as lettering, sidewall geometry, rim geometry, and interaction with the vehicle body. The work is broken into two parts. Part 1 consisted of investigation of a canonical validation problem (turbulent flow over a cylinder) using existing tools with different meshes and turbulence models. Part 2 involved calculating drag differences over plate geometries with simple features (ridges and grooves) defined by Goodyear of approximately the size of interest for a tire. The results of part 1 show the level of noise to be expected in a drag calculation and highlight the sensitivity of absolute predictions to model parameters such as mesh size and turbulence model. There is 20-30% noise in the experimental measurements on the canonical cylinder problem, and a similar level of variation between different meshes and turbulence models. Part 2 shows that there is a notable difference in the predicted drag on the sample plate geometries, however, the computational cost of extending the LES model to a full tire would be significant. This cost could be reduced by implementation of more sophisticated wall and turbulence models (e.g. detached eddy simulations - DES) and by focusing the mesh refinement on feature subsets with the goal of comparing configurations rather than absolute predictivity for the whole tire.

  14. 75 FR 16456 - Inglis Hydropower, LLC; Notice Soliciting Scoping Comments

    Science.gov (United States)

    2010-04-01

    ... Hydropower, LLC; Notice Soliciting Scoping Comments March 26, 2010. Take notice that the following...: Inglis Hydropower, LLC. e. Name of Project: Inglis Hydropower Project. f. Location: The proposed project... Commission staff intends to prepare a single Environmental Assessment (EA) for the Inglis Hydropower Project...

  15. Frequency comparison involving the Romanian primary length standard RO.1 within the framework of the EUROMET Project #498

    Science.gov (United States)

    Popescu, Gheorghe

    2001-06-01

    An international frequency comparison was carried out at the Bundesamt fuer Eich- und Vermessungswessen (BEV), Vienna, within the framework of the EUROMET Project #498 from August 29 to September 5, 1999. The frequency differences obtained when the RO.1 laser from the National Institute for Laser, Plasma and Radiation Physics (NILPRP), Romania, was compared with five lasers from Austria (BEV1), Czech Republic (PLD1), France (BIPM3), Poland (GUM1) and Hungary (OMH1) are reported. Frequency differences were computed by using the matrix determinations for the group d, e, f, g. Considering the frequency differences measured for a group of three lasers compared to each other, we call the closing frequency the difference between measured and expected frequency difference (resulting from the previous two measurements). For the RO1 laser, when the BIPM3 laser was the reference laser, the closing frequencies range from +8.1 kHz to - 3.8 kHz. The relative Allan standard deviation was used to express the frequency stability and resulted 3.8 parts in 1012 for 100 s sampling time and 14000 s duration of the measurements. The averaged offset frequency relative to the BIPM4 stationary laser was 5.6 kHz and the standard deviation was 9.9 kHz.

  16. Involvement of Amylin and Leptin in the Development of Projections from the Area Postrema to the Nucleus of the Solitary Tract

    Directory of Open Access Journals (Sweden)

    Kathrin Abegg

    2017-11-01

    Full Text Available The area postrema (AP and the nucleus of the solitary tract (NTS are important hindbrain centers involved in the control of energy homeostasis. The AP mediates the anorectic action and the inhibitory effect on gastric emptying induced by the pancreatic hormone amylin. Amylin’s target cells in the AP project to the NTS, an integrative relay center for enteroceptive signals. Perinatal hormonal and metabolic factors influence brain development. A postnatal surge of the adipocyte-derived hormone leptin represents a developmental signal for the maturation of projections between hypothalamic nuclei controlling energy balance. Amylin appears to promote neurogenesis in the AP in adult rats. Here, we examined whether amylin and leptin are required for the development of projections from the AP to the NTS in postnatal and adult mice by conducting neuronal tracing studies with DiI in amylin- (IAPP−/− and leptin-deficient (ob/ob mice. Compared to wild-type littermates, postnatal (P10 and adult (P60 IAPP−/− mice showed a significantly reduced density of AP-NTS projections. While AP projections were also reduced in postnatal (P14 ob/ob mice, AP-NTS fiber density did not differ between adult ob/ob and wild-type animals. Our findings suggest a crucial function of amylin for the maturation of neuronal brainstem pathways controlling energy balance and gastrointestinal function. The impaired postnatal development of neuronal AP-NTS projections in ob/ob mice appears to be compensated in this experimental model during later brain maturation. It remains to be elucidated whether an amylin- and leptin-dependent modulation in neuronal development translates into altered AP/NTS-mediated functions.

  17. Projecting Fatalities in Crashes Involving Older Drivers, 2000–2025, CRADA No. ORNL98-0500 Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Hu, Patricia S. [ORNL; Jones, Donald W. [ORNL; Reuscher, Timothy [Oak Ridge Institute for Science and Education; Schmoyer, Richard S. [ORNL; Truett, Lorena F. [ORNL

    2000-04-01

    At the turn of the century – the 20th century that is – the median age in the United States was under 30 years; America was 60% rural in nature; and there were only 36 highway fatalities all year. As we leave the 20th century behind, the route into the 21st century is very different. “Intelligent” cars speed down multi-lane “smart” highways in a nation that is 75% urban. According to the Federal Highway Administration’s Highway Statistics, there are 28,000 times more vehicles on the road in 2000 than there were in 1900, and these vehicles travel about 2.6 trillion miles each year. Annual fatalities resulting from highway crashes have also increased – by over 1100%. We see other changes as well. The face of America is changing. It is growing older. In 2025, persons 65 and over will make up 18.5% of the total population. The number of persons aged 85 and over is increasing more rapidly than any other age group. More importantly, the elderly are taking more trips, driving further, and continuing to drive much later in life. These conditions lead to concerns about traffic safety. Although the elderly are healthier and drive safer cars than they did just two decades ago, their frailty makes them more susceptible to injury than younger persons involved in traffic crashes of the same severity. In addition, visual, physical, and cognitive skills, all of which contribute to driving abilities, decrease with advancing age. The familiar “U”-shaped curve depicting the rate of fatalities per vehicle miles traveled, shows that the elderly experience a higher highway fatality rate than any other age group except teenagers. While the overall number of highway fatalities has decreased regularly since 1972, the number of fatalities of elderly travelers has continued to increase steadily. This increase is cause for concern for both the elderly driver and for other persons on the roads who migh tbe placed in danger through crashes involving elderly drivers.

  18. The importance of Probabilistic Safety Assessment in the careful study of risks involved to new nuclear power plant projects

    International Nuclear Information System (INIS)

    Mata, Jônatas F.C. da; Mesquita, Amir Z.

    2017-01-01

    The Fukushima Daiichi nuclear accident in Japan in 2011 has raised public fears about the actual safety of nuclear power plants in several countries. The response to this concern by government agencies and private companies has been objective and pragmatic in order to guarantee best practices in the design, construction, operation and decommissioning phases of nuclear reactors. In countries where the nucleo-electric matrix is consolidated, such as the United States, France and the United Kingdom, the safety assessment is carried out considering deterministic and probabilistic criteria. In the licensing stages of new projects, it is necessary to analyze and simulate the behavior of the nuclear power plant, when subjected to conditions that can lead to sequences of accidents. Each initiator event is studied and simulated through computational models, which allow the description and estimation of possible physical phenomena occurring in nuclear reactors. Probabilistic Safety Assessment (PSA) is fundamental in this process, as it studies in depth the sequences of events that can lead to the fusion of the nucleus of the nuclear reactor. Such sequences should be quantified in terms of probability of occurrence and your possible consequences, and organized through techniques such as Fault Tree Analysis and Event Tree Analysis. For these simulations, specialized computer codes for each type of phenomenon should be used, as well as databases based on experience gained in the operation of similar nuclear reactors. The present work will describe, in an objective way, the procedures for the realization of PSA and its applicability to the assurance of the operational reliability of the nuclear reactors, as well as a brief comparative between the approaches used in some countries traditionally users of thermonuclear energy and Brazil. By means of this analysis, it can be concluded that nuclear power is increasingly reliable and safe, being able to provide the necessary

  19. The importance of Probabilistic Safety Assessment in the careful study of risks involved to new nuclear power plant projects

    Energy Technology Data Exchange (ETDEWEB)

    Mata, Jônatas F.C. da, E-mail: jonatasfmata@yahoo.com.br [Universidade do Estado de Minas Gerais (UEMG), João Monlevade, MG (Brazil); Mesquita, Amir Z., E-mail: amir@cdtn.br [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2017-07-01

    The Fukushima Daiichi nuclear accident in Japan in 2011 has raised public fears about the actual safety of nuclear power plants in several countries. The response to this concern by government agencies and private companies has been objective and pragmatic in order to guarantee best practices in the design, construction, operation and decommissioning phases of nuclear reactors. In countries where the nucleo-electric matrix is consolidated, such as the United States, France and the United Kingdom, the safety assessment is carried out considering deterministic and probabilistic criteria. In the licensing stages of new projects, it is necessary to analyze and simulate the behavior of the nuclear power plant, when subjected to conditions that can lead to sequences of accidents. Each initiator event is studied and simulated through computational models, which allow the description and estimation of possible physical phenomena occurring in nuclear reactors. Probabilistic Safety Assessment (PSA) is fundamental in this process, as it studies in depth the sequences of events that can lead to the fusion of the nucleus of the nuclear reactor. Such sequences should be quantified in terms of probability of occurrence and your possible consequences, and organized through techniques such as Fault Tree Analysis and Event Tree Analysis. For these simulations, specialized computer codes for each type of phenomenon should be used, as well as databases based on experience gained in the operation of similar nuclear reactors. The present work will describe, in an objective way, the procedures for the realization of PSA and its applicability to the assurance of the operational reliability of the nuclear reactors, as well as a brief comparative between the approaches used in some countries traditionally users of thermonuclear energy and Brazil. By means of this analysis, it can be concluded that nuclear power is increasingly reliable and safe, being able to provide the necessary

  20. Problems and risks involved in the projected storage of radioactive waste in a salt dome in the northwest of the FRG

    International Nuclear Information System (INIS)

    Mauthe, F.

    1979-01-01

    Current planning envisages long-term intermediate storage of radioactive waste and the exploration of the Gorleben salt dome by deep drilling in order to start appropriate mining work in case of favourable drilling results. The statements presented here on the problem of the 'Feasibility of ultimate storage of radioactive waste in salt deposits' (subject selected by the Government of the land Lower-Saxony) are aimed at informing the general public about the difficulties and problems involved in this waste disposal project and critically assess the arguments put forward by industry and licensing authorities in order to gain acceptance for this politically delicate project; the argumentation discussed here mainly refers to the field of geological science. (orig.) [de

  1. 42 CFR 403.200 - Basis and scope.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Basis and scope. 403.200 Section 403.200 Public... PROVISIONS SPECIAL PROGRAMS AND PROJECTS Medicare Supplemental Policies § 403.200 Basis and scope. (a... intent of that section is to enable Medicare beneficiaries to identify Medicare supplemental policies...

  2. 7 CFR 634.1 - Purpose and scope.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Purpose and scope. 634.1 Section 634.1 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM General § 634.1 Purpose and scope. (a) The purpose... from agricultural activities. The proposed project area must be within a high priority area in an...

  3. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  4. 76 FR 51022 - Juneau Hydropower, Inc.; Notice of Scoping Meeting and Site Visit and Soliciting Scoping Comments...

    Science.gov (United States)

    2011-08-17

    ... Hydropower, Inc.; Notice of Scoping Meeting and Site Visit and Soliciting Scoping Comments for an Applicant...: Alternative Licensing Process. b. Project No.: 13563-001. c. Applicant: Juneau Hydropower, Inc. d. Name of... Mitchell, Business Manager, Juneau Hydropower, Inc., P.O. Box 22775, Juneau, AK 99802; 907-789-2775, e...

  5. A Project-Based Learning Approach to Teaching Physics for Pre-Service Elementary School Teacher Education Students

    Science.gov (United States)

    Goldstein, Olzan

    2016-01-01

    This paper describes the impact of the project-based learning (PBL) approach on learning and teaching physics from the perspective of pre-service elementary school teacher education students and an instructor. This approach promoted meaningful learning (mainly in the scope of projects), higher motivation, and active involvement of students in…

  6. SCOPE: a scorecard for osteoporosis in Europe

    OpenAIRE

    Kanis, J. A.; Borgström, F.; Compston, J.; Dreinhöfer, K.; Nolte, E.; Jonsson, L.; Lems, W. F.; McCloskey, E. V.; Rizzoli, R.; Stenmark, J.

    2013-01-01

    The scorecard summarises key indicators of the burden of osteoporosis and its management in each of the member states of the European Union. The resulting scorecard elements were then assembled on a single sheet to provide a unique overview of osteoporosis in Europe. Introduction: The scorecard for osteoporosis in Europe (SCOPE) is an independent project that seeks to raise awareness of osteoporosis care in Europe. The aim of this project was to develop a scorecard and background documents to...

  7. ScienceScope: Aerospace

    CSIR Research Space (South Africa)

    CSIR

    2006-12-01

    Full Text Available In this edition of ScienceScope, innovations in and around aerodynamics research and development is explored. The publication explores activities in environmentally friendly aerospace technologies to enhance the aviation industry....

  8. Concrete decontamination scoping tests

    International Nuclear Information System (INIS)

    Archibald, K.E.

    1995-01-01

    This report details the research efforts and scoping tests performed at the Idaho Chemical Process Plant using scabbling, chemical, and electro-osmotic decontamination techniques on radiologically contaminated concrete

  9. RADAR PPI Scope Overlay

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — RADAR PPI Scope Overlays are used to position a RADAR image over a station at the correct resolution. The archive maintains several different RADAR resolution types,...

  10. Evidence-based development of school-based and family-involved prevention of overweight across Europe: The ENERGY-project's design and conceptual framework

    Directory of Open Access Journals (Sweden)

    Klepp Knut

    2010-05-01

    Full Text Available Abstract Background There is an urgent need for more carefully developed public health measures in order to curb the obesity epidemic among youth. The overall aim of the "EuropeaN Energy balance Research to prevent excessive weight Gain among Youth" (ENERGY-project is the development and formative evaluation of a theory-informed and evidence-based multi-component school-based and family-involved intervention program ready to be implemented and evaluated for effectiveness across Europe. This program aims at promoting the adoption or continuation of health behaviors that contribute to a healthy energy balance among school-aged children. Earlier studies have indicated that school and family environments are key determinants of energy-balance behaviors in schoolchildren. Schools are an important setting for health promotion in this age group, but school-based interventions mostly fail to target and involve the family environment. Methods Led by a multidisciplinary team of researchers from eleven European countries and supported by a team of Australian experts, the ENERGY-project is informed by the Environmental Research Framework for Weight gain Prevention, and comprises a comprehensive epidemiological analysis including 1 systematic reviews of the literature, 2 secondary analyses of existing data, 3 focus group research, and 4 a cross European school-based survey. Results and discussion The theoretical framework and the epidemiological analysis will subsequently inform stepwise intervention development targeting the most relevant energy balance-related behaviors and their personal, family-environmental and school-environmental determinants applying the Intervention Mapping protocol. The intervention scheme will undergo formative and pilot evaluation in five countries. The results of ENERGY will be disseminated among key stakeholders including researchers, policy makers and the general population. Conclusions The ENERGY-project is an international

  11. 24 CFR 266.125 - Scope and nature of sanctions.

    Science.gov (United States)

    2010-04-01

    ... AUTHORITIES HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Housing Finance Agency Requirements § 266.125 Scope and nature of sanctions. (a) Actions by Designated...

  12. 10 CFR 715.1 - Purpose and scope.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Purpose and scope. 715.1 Section 715.1 Energy DEPARTMENT OF ENERGY DEFINITION OF NON-RECOURSE PROJECT-FINANCED § 715.1 Purpose and scope. This part sets forth the definition of “nonrecourse project-financed” as that term is used to define “new independent power...

  13. 12 CFR 5.1 - Scope.

    Science.gov (United States)

    2010-01-01

    ... COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY RULES, POLICIES, AND PROCEDURES FOR CORPORATE ACTIVITIES § 5.1 Scope. This part establishes rules, policies and procedures of the Office of the Comptroller of the Currency (OCC) for corporate activities and transactions involving national banks. It contains...

  14. Models & Methods in SCOPE A Status Report

    Science.gov (United States)

    2008-04-01

    Projecttitel april 2008 Soldaat Optreden Scope Consolidatie Auteur (s) drs. E.M. Ubink Programmanummer Projectnummer dr. W.A. Lotens V707 032.13 114 drs...starvation. The fat and protein involved is handled through the muscle equation. Excess glucose production is converted to body fat. In theory body fat is

  15. 32 CFR 516.38 - Scope.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 3 2010-07-01 2010-07-01 true Scope. 516.38 Section 516.38 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY AID OF CIVIL AUTHORITIES AND PUBLIC RELATIONS... involving missions and functions of DA, its major and subordinate commands, all installations presently or...

  16. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  17. IDC Reengineering Phase 2 & 3 Project Scope

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Prescott, Ryan [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-10-01

    Sandia National Laboratories has prepared a cost estimate budgetary planning for the IDC Reengineering Phase 2 & 3 effort. This report provides the cost estimate and describes the methodology, assumptions, and cost model details used to create the cost estimate.

  18. Full-scope training simulators

    International Nuclear Information System (INIS)

    Ugedo, E.

    1986-01-01

    The following topics to be covered in this report are: Reasons justifying the use of full-scope simulators for operator qualification. Full-scope simulator description: the control room, the physical models, the computer complex, the instructor's console. Main features of full-scope simulators. Merits of simulator training. The role of full-scope simulators in the training programs. The process of ordering and acquiring a full-scope simulator. Maintaining and updating simulator capabilities. (orig./GL)

  19. 42 CFR 67.10 - Purpose and scope.

    Science.gov (United States)

    2010-10-01

    ... and procedures; projects to improve methods and data bases for outcomes, effectiveness, and other... Research, Evaluation, Demonstration, and Dissemination Projects § 67.10 Purpose and scope. The regulations... projects, including conferences, on health care services and systems for the delivery of such services, as...

  20. Learning effects of active involvement of secondary school students in scientific research within the Sparkling Science project "FlussAu:WOW!"

    Science.gov (United States)

    Poppe, Michaela; Zitek, Andreas; Scheikl, Sigrid; Heidenreich, Andrea; Kurz, Roman; Schrittwieser, Martin; Muhar, Susanne

    2014-05-01

    Due to immense technological and economic developments, human activities producing greenhouse gases, destructing ecosystems, changing landscapes and societies are influencing the world to such a degree, that the environment and human well-being are significantly affected. This results in a need to educate citizens towards a scientific understanding of complex socio-environmental systems. The OECD programme for international student assessment (PISA - http://www.pisa.oecd.org) investigated in detail the science competencies of 15-year-old students in 2006. The report documented that teenagers in OECD countries are mostly well aware of environmental issues but often know little about their causes or options to tackle these challenges in the future. For the integration of science with school learning and involving young people actively into scientific research Sparkling Science projects are funded by the Federal Ministry of Science and Research in Austria. Within the Sparkling Science Project "FlussAu:WOW!" (http://www.sparklingscience.at/de/projekte/574-flussau-wow-/) scientists work together with 15 to 18-year-old students of two Austrian High Schools over two years to assess the functions and processes in near natural and anthropogenically changed river floodplains. Within the first year of collaboration students, teachers and scientists elaborated on abiotic, biotic and spatial indicators for assessing and evaluating the ecological functionality of riverine systems. After a theoretical introduction students formulated research questions, hypotheses and planned and conducted field work in two different floodplain areas in Lower Austria. From the second year on, students are going to develop qualitative models on processes in river floodplain systems by means of the learning software "DynaLearn". The "DynaLearn" software is an engaging, interactive, hierarchically structured learning environment that was developed within the EU-FP7 project "DynaLearn" (http

  1. PUREX transition project case study

    International Nuclear Information System (INIS)

    Jasen, W.G.

    1996-01-01

    In December 1992, the US Department of Energy (DOE) directed that the Plutonium-Uranium Extraction (PUREX) Plant be shut down and deactivated because it was no longer needed to support the nation's production of weapons-grade plutonium. The PUREX/UO 2 Deactivation Project will establish a safe and environmentally secure configuration for the facility and preserve that configuration for 10 years. The 10-year span is used to predict future maintenance requirements and represents the estimated time needed to define, authorize, and initiate the follow-on decontamination and decommissioning activities. Accomplishing the deactivation project involves many activities. Removing major hazards, such as excess chemicals, spent fuel, and residual plutonium are major goals of the project. The scope of the PUREX Transition Project is described within

  2. Promoting the inclusion of Afghan women and men in research: reflections from research and community partners involved in implementing a 'proof of concept' project.

    Science.gov (United States)

    Riggs, Elisha; Yelland, Jane; Szwarc, Josef; Casey, Sue; Chesters, Donna; Duell-Piening, Philippa; Wahidi, Sayed; Fouladi, Fatema; Brown, Stephanie

    2015-01-31

    With mounting evidence that poor maternal and child health outcomes are related to the social determinants of health, researchers need to engage with vulnerable and isolated communities to gather the evidence that is essential to determine appropriate solutions. Conventional research methods may not ensure the degree and quality of participation that is necessary for meaningful study findings. Participatory methods provide reciprocal opportunities for often excluded communities to both take part in, and guide the conduct of research. The Having a baby in a new country research project was undertaken to provide evidence about how women and men of refugee background experience health services at the time of having a baby. This two year, multifaceted proof of concept study comprised: 1) an organisational partnership to oversee the project; 2) a community engagement framework including: female and male Afghan community researchers, community and sector stakeholder advisory groups and community consultation and engagement. Inclusive research strategies that address power imbalances in research, and diversity of and within communities, are necessary to obtain the evidence required to address health inequalities in vulnerable populations. Such an approach involves mindfully adapting research processes to ensure that studies have regard for the advice of community members about the issues that affect them. Researchers have much to gain by committing time and resources to engaging communities in reciprocal ways in research processes.

  3. Oxidizer Scoping Studies

    Energy Technology Data Exchange (ETDEWEB)

    Chancellor, Christopher John [Los Alamos National Laboratory

    2016-11-07

    The purpose of this report is to present the results of the acceptable knowledge (AK) review of oxidizers present in active waste streams, provide a technical analysis of the oxidizers, and report the results of the scoping study testing. This report will determine the fastest burning oxidizer to be used in the development of a Test Plan for Preparation and Testing of Sorbents Mixed with Oxidizer found in Transuranic Waste (DWT-TP-001). The companion report, DWT-RPT-002, Sorbent Scoping Studies, contains similar information for sorbents identified during the AK review of TRU waste streams. The results of the oxidizer and sorbent scoping studies will be used to inform the QL1 test plan. The QL1 test results will support the development of a basis of knowledge document that will evaluate oxidizing chemicals and sorbents in TRU waste and provide guidance for treatment.

  4. LogScope

    Science.gov (United States)

    Havelund, Klaus; Smith, Margaret H.; Barringer, Howard; Groce, Alex

    2012-01-01

    LogScope is a software package for analyzing log files. The intended use is for offline post-processing of such logs, after the execution of the system under test. LogScope can, however, in principle, also be used to monitor systems online during their execution. Logs are checked against requirements formulated as monitors expressed in a rule-based specification language. This language has similarities to a state machine language, but is more expressive, for example, in its handling of data parameters. The specification language is user friendly, simple, and yet expressive enough for many practical scenarios. The LogScope software was initially developed to specifically assist in testing JPL s Mars Science Laboratory (MSL) flight software, but it is very generic in nature and can be applied to any application that produces some form of logging information (which almost any software does).

  5. Involving women.

    Science.gov (United States)

    Agbo, J

    1994-01-01

    I am a primary health care (PHC) coordinator working with the May Day Rural project, a local NGO involved in integrated approaches and programs with rural communities in the Ga District of the Greater-Accra region in Ghana. When we talk about the community development approach we must first and foremost recognize that we are talking about women, because in the developing world frequent childbirths mean that her burden of mortality is higher than a man's; her workload is extremely heavy--whether in gardening, farming, other household duties, caring for the sick, or the rearing of children; she has a key role in PHC and community development, because men are always looking for greener pastures elsewhere, leaving the women behind. Women's concerns are critical in most health care projects and women and children are their main beneficiaries. Why not include women in the management team, project design, implementation and evaluation processes? That is what the May Day Rural project is practicing, encouraging women's participation and creating a relationship of trust. full text

  6. FedScope Employment Cubes

    Data.gov (United States)

    Office of Personnel Management — This raw data set provides Federal civilian employee population data. The scope of this raw data set includes all data elements used in the creation of the FedScope...

  7. Involvement of the anterior cingulate cortex in time-based prospective memory task monitoring: An EEG analysis of brain sources using Independent Component and Measure Projection Analysis.

    Directory of Open Access Journals (Sweden)

    Gabriela Cruz

    Full Text Available Time-based prospective memory (PM, remembering to do something at a particular moment in the future, is considered to depend upon self-initiated strategic monitoring, involving a retrieval mode (sustained maintenance of the intention plus target checking (intermittent time checks. The present experiment was designed to explore what brain regions and brain activity are associated with these components of strategic monitoring in time-based PM tasks.24 participants were asked to reset a clock every four minutes, while performing a foreground ongoing word categorisation task. EEG activity was recorded and data were decomposed into source-resolved activity using Independent Component Analysis. Common brain regions across participants, associated with retrieval mode and target checking, were found using Measure Projection Analysis.Participants decreased their performance on the ongoing task when concurrently performed with the time-based PM task, reflecting an active retrieval mode that relied on withdrawal of limited resources from the ongoing task. Brain activity, with its source in or near the anterior cingulate cortex (ACC, showed changes associated with an active retrieval mode including greater negative ERP deflections, decreased theta synchronization, and increased alpha suppression for events locked to the ongoing task while maintaining a time-based intention. Activity in the ACC was also associated with time-checks and found consistently across participants; however, we did not find an association with time perception processing per se.The involvement of the ACC in both aspects of time-based PM monitoring may be related to different functions that have been attributed to it: strategic control of attention during the retrieval mode (distributing attentional resources between the ongoing task and the time-based task and anticipatory/decision making processing associated with clock-checks.

  8. Scope and closures

    CERN Document Server

    Simpson, Kyle

    2014-01-01

    No matter how much experience you have with JavaScript, odds are you don’t fully understand the language. This concise yet in-depth guide takes you inside scope and closures, two core concepts you need to know to become a more efficient and effective JavaScript programmer. You’ll learn how and why they work, and how an understanding of closures can be a powerful part of your development skillset.

  9. Sorbent Scoping Studies

    International Nuclear Information System (INIS)

    Chancellor, Christopher John

    2016-01-01

    The Los Alamos National Laboratory-Carlsbad Operations (LANL-CO) office was tasked by the DOE CBFO, Office of the Manager to perform a review of the acceptable knowledge (AK) to identify the oxidizers and sorbents in transuranic (TRU) waste streams, to conduct scoping studies on the oxidizers and sorbents identified in AK review to inform the Quality Level 1 (QL1) testing, and to conduct a series of QL1 tests to provide the scientific data to support a basis of knowledge document for determining the criteria for (1) accepting waste at the Waste Isolation Pilot Plant (WIPP) without treatment, (2) determining waste that will require treatment, and (3) if treatment is required, how the treatment must be performed. The purpose of this report is to present the results of the AK review of sorbents present in active waste streams, provide a technical analysis of the sorbent list, report the results of the scoping studies for the fastest-burning organic sorbent, and provide the list of organic and inorganic sorbents to be used in the development of a Test Plan for Preparation and Testing of Sorbents Mixed with Oxidizer found in Transuranic Waste (DWT-TP-001). The companion report, DWT-RPT-001, Oxidizer Scoping Studies, has similar information for oxidizers identified during the AK review of TRU waste streams. The results of the oxidizer and sorbent scoping studies will be used to inform the QL1 test plan. The QL1 test results will support the development of a basis of knowledge document that will evaluate oxidizing chemicals and sorbents in TRU waste and provide guidance for treatment.

  10. Sorbent Scoping Studies

    Energy Technology Data Exchange (ETDEWEB)

    Chancellor, Christopher John [Los Alamos National Lab. (LANL), Carlsbad, NM (United States). Difficult Waste Team

    2016-11-14

    The Los Alamos National Laboratory–Carlsbad Operations (LANL-CO) office was tasked by the DOE CBFO, Office of the Manager to perform a review of the acceptable knowledge (AK) to identify the oxidizers and sorbents in transuranic (TRU) waste streams, to conduct scoping studies on the oxidizers and sorbents identified in AK review to inform the Quality Level 1 (QL1) testing, and to conduct a series of QL1 tests to provide the scientific data to support a basis of knowledge document for determining the criteria for (1) accepting waste at the Waste Isolation Pilot Plant (WIPP) without treatment, (2) determining waste that will require treatment, and (3) if treatment is required, how the treatment must be performed. The purpose of this report is to present the results of the AK review of sorbents present in active waste streams, provide a technical analysis of the sorbent list, report the results of the scoping studies for the fastest-burning organic sorbent, and provide the list of organic and inorganic sorbents to be used in the development of a Test Plan for Preparation and Testing of Sorbents Mixed with Oxidizer found in Transuranic Waste (DWT-TP-001). The companion report, DWT-RPT-001, Oxidizer Scoping Studies, has similar information for oxidizers identified during the AK review of TRU waste streams. The results of the oxidizer and sorbent scoping studies will be used to inform the QL1 test plan. The QL1 test results will support the development of a basis of knowledge document that will evaluate oxidizing chemicals and sorbents in TRU waste and provide guidance for treatment.

  11. Towards a Scope Management of Non-Functional Requirements in Requirements Engineering

    NARCIS (Netherlands)

    Kassab, M.; Ormandjieva, O.; Daneva, Maia; Ebert, C.; Herrmann, A.; Rupp, C.

    2007-01-01

    Getting business stakeholders’ goals formulated clearly and project scope defined realistically increases the chance of success for any application development process. As a consequence, stakeholders at early project stages acquire as much as possible knowledge about the requirements, their risk

  12. DECOVALEX-THMC Project. Task A. Influence of near field coupled THM phenomena on the performance of a spent fuel repository. Report of Task A1: Preliminary scoping calculations

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, Son (ed.) [Canadian Nuclear Safety Commission (Canada); Lanru Jing (ed.) [Royal Institute of Technology, Stockholm (Sweden); Boergesson, Lennart [Clay Technology AB, Lund (Sweden); Chijimatzu, Masakazu [Hazama Corporation (Japan); Jussila, Petri [Helsinki Univ. of Technology, Helsinki (Finland); Rutqvist, Jonny [Lawrence Berkeley National Laboratory CA (United States)

    2007-02-15

    The DECOVALEX-THMC project is an ongoing international co-operative project that was stared in 2004 to support the development of mathematical models of coupled Thermal (T), Hydrological (H), Mechanical (M) and Chemical (C) processes in geological media for siting potential nuclear fuel waste repositories. The general objective is to characterise and evaluate the coupled THMC processes in the near field and far field of a geological repository and to assess their impact on performance assessment: - during the three phases of repository development: excavation phase, operation phase and post-closure phase; - for three different rocks types: crystalline, argillaceous and tuff; - with specific focus on the issues of: Excavation Damaged Zone (EDZ), permanent property changes of rock masses, and glaciation and permafrost phenomena. The project involves a large number of research teams supported by radioactive waste management agencies or governmental regulatory bodies in Canada, China, Finland, France, Germany, Japan, Sweden and USA, who conducted advanced studies and numerical modelling of coupled THMC processes under five tasks. This report presents the definition of the first phase, Task A-1, of the Task A of the project. The task is a working example of how interaction between THMC modelling and SA analysis could be performed. Starting with the technical definition of the Task A, the report presents the results of preliminary THM calculations with a purpose of an initial appreciation of the phenomena and material properties that must be better understood in subsequent phases. Many simplifications and assumptions were introduced and the results should be considered under these assumptions. Based on the evaluation of the multiple teams' results, a few points of concern were identified that may guide the successive phases of Task A studies: 1. The predicted maximum total stress in the MX-80 bentonite could slightly exceed the 15 MPa design pressure for the

  13. DECOVALEX-THMC Project. Task A. Influence of near field coupled THM phenomena on the performance of a spent fuel repository. Report of Task A1: Preliminary scoping calculations

    International Nuclear Information System (INIS)

    Nguyen, Son; Lanru Jing; Boergesson, Lennart; Chijimatzu, Masakazu; Jussila, Petri; Rutqvist, Jonny

    2007-02-01

    The DECOVALEX-THMC project is an ongoing international co-operative project that was stared in 2004 to support the development of mathematical models of coupled Thermal (T), Hydrological (H), Mechanical (M) and Chemical (C) processes in geological media for siting potential nuclear fuel waste repositories. The general objective is to characterise and evaluate the coupled THMC processes in the near field and far field of a geological repository and to assess their impact on performance assessment: - during the three phases of repository development: excavation phase, operation phase and post-closure phase; - for three different rocks types: crystalline, argillaceous and tuff; - with specific focus on the issues of: Excavation Damaged Zone (EDZ), permanent property changes of rock masses, and glaciation and permafrost phenomena. The project involves a large number of research teams supported by radioactive waste management agencies or governmental regulatory bodies in Canada, China, Finland, France, Germany, Japan, Sweden and USA, who conducted advanced studies and numerical modelling of coupled THMC processes under five tasks. This report presents the definition of the first phase, Task A-1, of the Task A of the project. The task is a working example of how interaction between THMC modelling and SA analysis could be performed. Starting with the technical definition of the Task A, the report presents the results of preliminary THM calculations with a purpose of an initial appreciation of the phenomena and material properties that must be better understood in subsequent phases. Many simplifications and assumptions were introduced and the results should be considered under these assumptions. Based on the evaluation of the multiple teams' results, a few points of concern were identified that may guide the successive phases of Task A studies: 1. The predicted maximum total stress in the MX-80 bentonite could slightly exceed the 15 MPa design pressure for the container

  14. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  15. Dilemmas within Commercial Involvement in Open Source Software

    DEFF Research Database (Denmark)

    Ciesielska, Malgorzata; Westenholz, Ann

    2016-01-01

    to free-riding. There are six levels of commercial involvement in open source communities, and each of them is characterized by a different dilemma. Originality/value – The paper sheds light on the various level of involvement of business in open source movement and emphasize that the popularized “open......Purpose – The purpose of this paper is to contribute to the literature about the commercial involvement in open source software, levels of this involvement and consequences of attempting to mix various logics of action. Design/methodology/approach – This paper uses the case study approach based...... on mixed methods: literature reviews and news searches, electronic surveys, qualitative interviews and observations. It combines discussions from several research projects as well as previous publications to present the scope of commercial choices within open source software and their consequences...

  16. On the Scope of Egalitarian Justice

    Directory of Open Access Journals (Sweden)

    Joseph Heath

    2006-05-01

    Full Text Available It is not clear whether the social contract is supposed to merely supplement the unequal gains that individuals are able to make through the exercise of their natural endowments with a set of equal gains secured through social cooperation, or whether the social contract must also compensate individuals for the effects of these natural inequalities, so that they literally become all equal. The issue concerns, in effect, whether natural inequality falls within the scope of egalitarian justice. I think it is fair to say that the majority of egalitarians assume that the principle of equality imposes an obligation to redress natural inequality. Yet there is no consensus on this issue. David Gauthier has made the rejection of the principle of redress a central component of his project. It has often escaped notice that John Rawls also rejects the principle of redress. Thus it is not just anti-egalitarians who reject the principle of redress. There is a current of egalitarian thought– which we might call, for lack of a better term, narrow-scope egalitarianism – which also rejects this principle. In this paper, I would like to show that there is considerable wisdom in the narrow-scope egalitarian position. Many of the problems that lead theorists to reject egalitarianism in its entirety are a consequence, not of the principle of equality per se, but rather of the commitment to redress natural inequality. The narrow-scope view avoids all of these difficulties.

  17. Waste Management Project Contingency Analysis

    International Nuclear Information System (INIS)

    Edward L. Parsons, Jr.

    1999-01-01

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion

  18. The SCOPE Mission

    International Nuclear Information System (INIS)

    Fujimoto, M.; Tsuda, Y.; Saito, Y.; Shinohara, I.; Takashima, T.; Matsuoka, A.; Kojima, H.; Kasaba, Y.

    2009-01-01

    In order to reach the new horizon of the space physics research, the Plasma Universe, via in-situ measurements in the Earth's magnetosphere, SCOPE will perform formation flying observations combined with high-time resolution electron measurements. The simultaneous multi-scale observations by SCOPE of various plasma dynamical phenomena will enable data-based study of the key space plasma processes from the cross-scale coupling point of view. Key physical processes to be studied are magnetic reconnection under various boundary conditions, shocks in space plasma, collisionless plasma mixing at the boundaries, and physics of current sheets embedded in complex magnetic geometries. The SCOPE formation is made up of 5 spacecraft and is put into the equatorial orbit with the apogee at 30 Re (Re: earth radius). One of the spacecraft is a large mother ship which is equipped with a full suite of particle detectors including ultra-high time resolution electron detector. Among other 4 small spacecraft, one remains near (∼10 km) the mother ship and the spacecraft-pair will focus on the electron-scale physics. Others at the distance of 100∼3000 km(electron∼ion spatial scales) from the mother ship will monitor plasma dynamics surrounding the mother-daughter pair. There is lively on-going discussion on Japan-Europe international collaboration (ESA's Cross-Scale), which would certainly make better the coverage over the scales of interest and thus make the success of the mission, i.e., clarifying the multi-scale nature of the Plasma Universe, to be attained at an even higher level.

  19. Involvement of the US Department of Defense in Civilian Assistance, Part I: a quantitative description of the projects funded by the Overseas Humanitarian, Disaster, and Civic Aid Program.

    Science.gov (United States)

    Bourdeaux, Margaret Ellis; Lawry, Lynn; Bonventre, Eugene V; Burkle, Frederick M

    2010-03-01

    To review the history and goals of the US Department of Defense's largest civilian assistance program, the Overseas Humanitarian, Disaster and Civic Aid Program and to describe the number, geographic regions, years, key words, countries, and types of projects carried out under this program since 2001. Using the program's central database, we reviewed all approved projects since 2001 and tabulated them by year, combatant command, country, and key word. We also reviewed the project descriptions of projects funded between January 1, 2006, and February 9, 2008, and examined how their activities varied by combatant command and year. Of the 5395 projects in the database, 2097 were funded. Projects took place in more than 90 countries, with Southern, Pacific, and Africa Command hosting the greatest number. The most common types of projects were school, health, disaster response, and water infrastructure construction, and disaster-response training. The "global war on terror" was the key word most frequently tagged to project descriptions. Project descriptions lacked stated goals as well as implementation and coordination strategies with potential partners, and did not report outcome or impact indicators. The geographic reach of the program is vast and projects take place in a wide variety of public sectors. Yet their security and civilian assistance value remains unclear given the lack of stated project goals, implementation strategies, or measures of effectiveness. To facilitate transparency and policy discussion, we recommend project proposals include hypotheses as to how they will enhance US security, their relevance to the public sector they address, and outcome and impact indicators that can assess their value and effectiveness.

  20. New developments in Generator Services project

    International Nuclear Information System (INIS)

    Karneyeu, A; Kirsanov, M; Konstantinov, D; Ryabov, A; Zenin, O; Pokorski, W; Ribon, A

    2011-01-01

    The LOG Generator Services project provides validated, LOG compliant Monte Carlo generators code for both the theoretical and experimental communities at the LHC. In this paper we present the recent developments and the future plans of the project. We report on the current status of the generators repository, the new Autotools-based build system, as well as the new installation tools to create mirrors of the repository. We discuss new developments in testing and physics validation procedures in particular the use of HepMC Analysis Tool, as well as the Rivet validation tool. We also present a new activity, enlarging the scope of the Generator Services project, it is the involvement in the tuning of the Monte Carlo generators. This work, being essential for the understanding of the future LHC data, is now starting with the involvement of all the LHC experiments.

  1. Scoping Study: Networked Microgrids.

    Energy Technology Data Exchange (ETDEWEB)

    Trinklei, Eddy; Parker, Gordon; Weaver, Wayne; Robinett, Rush; Babe Gauchia, Lucia; Ten, Chee-Wooi; Bower, Ward; Glover, Steven F.; Bukowski, Steve

    2014-10-01

    This report presents a scoping study for networked microgrids which are defined as "Interoperable groups of multiple Advanced Microgrids that become an integral part of the electricity grid while providing enhanced resiliency through self-healing, aggregated ancillary services, and real-time communication." They result in optimal electrical system configurations and controls whether grid-connected or in islanded modes and enable high penetrations of distributed and renewable energy resources. The vision for the purpose of this document is: "Networked microgrids seamlessly integrate with the electricity grid or other Electric Power Sources (EPS) providing cost effective, high quality, reliable, resilient, self-healing power delivery systems." Scoping Study: Networked Microgrids September 4, 2014 Eddy Trinklein, Michigan Technological University Gordon Parker, Michigan Technological University Wayne Weaver, Michigan Technological University Rush Robinett, Michigan Technological University Lucia Gauchia Babe, Michigan Technological University Chee-Wooi Ten, Michigan Technological University Ward Bower, Ward Bower Innovations LLC Steve Glover, Sandia National Laboratories Steve Bukowski, Sandia National Laboratories Prepared by Michigan Technological University Houghton, Michigan 49931 Michigan Technological University

  2. The Cedar Project: resilience in the face of HIV vulnerability within a cohort study involving young Indigenous people who use drugs in three Canadian cities.

    Science.gov (United States)

    Pearce, Margo E; Jongbloed, Kate A; Richardson, Chris G; Henderson, Earl W; Pooyak, Sherri D; Oviedo-Joekes, Eugenia; Christian, Wunuxtsin M; Schechter, Martin T; Spittal, Patricia M

    2015-10-29

    Indigenous scholars have long argued that it is critical for researchers to identify factors related to cultural connectedness that may protect against HIV and hepatitis C infection and buffer the effects of historical and lifetime trauma among young Indigenous peoples. To our knowledge, no previous epidemiological studies have explored the effect of historical and lifetime traumas, cultural connectedness, and risk factors on resilience among young, urban Indigenous people who use drugs. This study explored risk and protective factors associated with resilience among participants of the Cedar Project, a cohort study involving young Indigenous peoples who use illicit drugs in three cities in British Columbia, Canada. We utilized the Connor-Davidson Resilience Scale to measure resilience, the Childhood Trauma Questionnaire to measure childhood maltreatment, and the Symptom-Checklist 90-Revised to measure psychological distress among study participants. Multivariate linear mixed effects models (LME) estimated the effect of study variables on mean change in resilience scores between 2011-2012. Among 191 participants, 92 % had experienced any form of childhood maltreatment, 48 % had a parent who attended residential school, and 71 % had been in foster care. The overall mean resilience score was 62.04, with no differences between the young men and women (p = 0.871). Adjusted factors associated with higher mean resilience scores included having grown up in a family that often/always lived by traditional culture (B = 7.70, p = 0.004) and had often/always spoken their traditional language at home (B = 10.52, p resilience scores. Adjusted factors associated with diminished mean resilience scores included severe childhood emotional neglect (B = -13.34, p = 0.001), smoking crack daily (B = -5.42, p = 0.044), having been sexual assaulted (B =  14.42, p = 0.041), and blackout drinking (B = -6.19, p = 0.027). Young people in this study have faced multiple complex challenges to

  3. 48 CFR 370.400 - Scope of subpart.

    Science.gov (United States)

    2010-10-01

    ... SPECIAL PROGRAMS AFFECTING ACQUISITION Acquisitions Involving the Use of Laboratory Animals 370.400 Scope... maintenance, and other activities involving live vertebrate animals conducted under contract (see Public Health Service Policy on Humane Care and Use of Laboratory Animals (PHS Policy), Rev. 1986, Repr. 1996...

  4. Testing the robustness of Citizen Science projects: Evaluating the results of pilot project COMBER.

    Science.gov (United States)

    Chatzigeorgiou, Giorgos; Faulwetter, Sarah; Dailianis, Thanos; Smith, Vincent Stuart; Koulouri, Panagiota; Dounas, Costas; Arvanitidis, Christos

    2016-01-01

    Citizen Science (CS) as a term implies a great deal of approaches and scopes involving many different fields of science. The number of the relevant projects globally has been increased significantly in the recent years. Large scale ecological questions can be answered only through extended observation networks and CS projects can support this effort. Although the need of such projects is apparent, an important part of scientific community cast doubt on the reliability of CS data sets. The pilot CS project COMBER has been created in order to provide evidence to answer the aforementioned question in the coastal marine biodiversity monitoring. The results of the current analysis show that a carefully designed CS project with clear hypotheses, wide participation and data sets validation, can be a valuable tool for the large scale and long term changes in marine biodiversity pattern change and therefore for relevant management and conservation issues.

  5. Advanced energy projects FY 1992 research summaries

    International Nuclear Information System (INIS)

    1992-09-01

    The Division of Advanced Energy Projects (AEP) provides support to explore the feasibility of novel, energy-related concepts that evolve from advances in basic research. These concepts are typically at an early stage of scientific definition and, therefore, are beyond the scope of ongoing applied research or technology development programs. The Division provides a mechanism for converting basic research findings to applications that eventually could impact the Nation's energy economy. Technical topics include physical, chemical, materials, engineering, and biotechnologies. Projects can involve interdisciplinary approaches to solve energy-related problems. Projects are supported for a finite period of time, which is typically three years. Annual funding levels for projects are usually about $300,000 but can vary from approximately $50,000 to $500,000. It is expected that, following AEP support, each concept will be sufficiently developed and promising to attract further funding from other sources in order to realize its full potential. There were 39 research projects in the Division of Advanced Energy Projects during Fiscal Year 1992 (October 1, 1991 -- September 30, 1992). The abstracts of those projects are provided to introduce the overall program in Advanced Energy Projects. Further information on a specific project may be obtained by contacting the principal investigator, who is listed below the project title. Projects completed during FY 1992 are indicated

  6. Characterization of the Unusual Product from the Reaction between Cobalt(II) Chloride, Ethane-1,2-diamine, and Hydrochloric Acid: An Undergraduate Project Involving an Unknown Metal Complex.

    Science.gov (United States)

    Curtis, Neil F.; And Others

    1986-01-01

    Discusses the need for student research-type chemistry projects based upon "unknown" metal complexes. Describes an experiment involving the product from the reaction between cobalt(II) chloride, ethane-1,2-diamine (en) and concentrated hydrochloric acid. Outlines the preparation of the cobalt complex, along with procedure, results and…

  7. Latin American forensic pathology: scope and needs

    Directory of Open Access Journals (Sweden)

    Gabriel M. Fonseca

    2012-10-01

    Full Text Available Pathology pertains to the study of a disease; from ancient times it has sought to explain the cause of death through postmortem examination. The advancement of science and technology has led to a greater definition of roles and has favored its development through different subspecialties among which we stands out forensic pathology. This discipline has its own characteristics, scope, case series, procedures and terminology. Likewise, although forensic pathology does not differ substantially from clinical pathology, significant differences can be found between the Anglo American approach and the Latin American approach. Beyond semantics of these alleged differences, the article reviews the concepts involved and discusses the scope and requirements needed to qualify experts, in the understanding that globalizing criteria should establish new paradigms and define the specific roles of the specialty.

  8. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  9. Negative affect varying in motivational intensity influences scope of memory.

    Science.gov (United States)

    Threadgill, A Hunter; Gable, Philip A

    2018-04-06

    Emotions influence cognitive processes involved in memory. While some research has suggested that cognitive scope is determined by affective valence, recent models of emotion-cognition interactions suggest that motivational intensity, rather than valence, influences these processes. The present research was designed to clarify how negative affects differing in motivational intensity impact memory for centrally or peripherally presented information. Experiments 1 & 2 found that, relative to a neutral condition, high intensity negative affect (anger) enhances memory for centrally presented information. Experiment 3 replicated this effect using another high intensity negative affect (threat). Experiment 4 extended this by finding that, relative to a neutral condition, low intensity negative affect (sadness) enhanced memory for peripherally presented information. Finally, in Experiment 5, the effects of sadness and threat on scope of memory were directly compared, finding that threat narrowed scope of memory, while sadness broadened scope of memory. Together, these results provide additional support for the motivational dimensional model of cognitive scope, in that high intensity emotions narrow cognitive scope, while low intensity emotions broaden cognitive scope.

  10. Scope of strategic marketing

    Directory of Open Access Journals (Sweden)

    Bradley Frank

    2004-01-01

    Full Text Available Marketing is a philosophy that leads to the process by which organizations, groups and individuals obtain what they need and want by identifying value, providing it, communicating it and delivering it to others. The core concepts of marketing are customers needs, wants and values; products, exchange, communications and relationships. Marketing is strategically concerned with the direction and scope of the long-term activities performed by the organization to obtain a competitive advantage. The organization applies its resources within a changing environment to satisfy customer needs while meeting stakeholder expectations. Implied in this view of strategic marketing is the requirement to develop a strategy to cope with competitors, identify market opportunities, develop and commercialize new products and services, allocate resources among marketing activities and design an appropriate organizational structure to ensure the perform once desired is achieved.

  11. Project Management Performance Drivers

    OpenAIRE

    Ra’ad, Mohammed A.; Najdawi, Mohammad K.

    2010-01-01

    The practice of project management has gained enormous importance over the past several years in various business industries. “In industries as diverse as pharmaceuticals, software, and aerospace, projects drive business” (Wheatley). This gain of importance can be attributed to the magnitude of the impact project performance results in terms of time, cost, and scope have over the project performing entity. “On the basis of data released by the Bureau of Economic Analysis, part of the US De...

  12. Green ergonomics: definition and scope.

    Science.gov (United States)

    Thatcher, Andrew

    2013-01-01

    This paper demonstrates that the goals of ergonomics (i.e. effectiveness, efficiency, health, safety and usability) are closely aligned with the goals of design for environmental sustainability. In this paper, the term 'green ergonomics' is conceptualised to specifically describe ergonomics interventions with a pro-nature emphasis. Green ergonomics is focused on the bi-directional connections between human systems and nature. This involves looking at (1) how ergonomics design and evaluation might be used to conserve, preserve, and restore nature and (2) how ecosystem services might be harnessed to facilitate the improved wellbeing and effectiveness of human systems. The paper proposes the scope of green ergonomics based on these bi-directional relationships in the areas of the design of low resource systems and products, the design of green jobs, and the design for behaviour change. Suggestions for further work in the green ergonomics domain are also made. Given the enormous environmental challenges facing modern industrial society, this paper encourages ergonomics science to embrace a pro-nature understanding of work design and research. This paper sets out the role for green ergonomics based on an appreciation of the human-nature connections that have been integrated with our understanding of ergonomics science and practice.

  13. 75 FR 42742 - Alaska Village Electric Cooperative; Notice of Environmental Site Review and Scoping Meeting

    Science.gov (United States)

    2010-07-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13272-001] Alaska Village Electric Cooperative; Notice of Environmental Site Review and Scoping Meeting July 15, 2010. a. Project No.: 13272-001. b. Name of Project: Old Harbor Hydroelectric Project. c. Location: On Mountain Creek, near the town of Old Harbor, Kodiak Island...

  14. LEX Project

    DEFF Research Database (Denmark)

    Damkilde, Lars; Larsen, Torben J.; Walbjørn, Jacob

    This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept.......This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept....

  15. 76 FR 7835 - Great River Hydropower, LLC; Notice of Scoping Meetings and Environmental Site Review and...

    Science.gov (United States)

    2011-02-11

    ... Hydropower, LLC; Notice of Scoping Meetings and Environmental Site Review and Soliciting Scoping Comments.... c. Date filed: July 12, 2010. d. Applicant: Great River Hydropower, LLC. e. Name of Project: Upper... 796-foot-long by 46-foot-wide by 25-foot-high concrete hydropower structure consisting of 30 turbine...

  16. The fuel cycle scoping system

    International Nuclear Information System (INIS)

    Dooley, G.D.; Malone, J.P.

    1986-01-01

    The Fuel Cycle Scoping System (FCSS) was created to fill the need for a scoping tool which provides the utilities with the ability to quickly evaluate alternative fuel management strategies, tails assay choices, fuel fabrication quotes, fuel financing alternatives, fuel cycle schedules, and other fuel cycle perturbations. The FCSS was specifically designed for PC's that support dBASE-III(TM), a relational data base software system by Ashton-Tate. However, knowledge of dBASE-III is not necessary in order to utilize the FCSS. The FCSS is menu driven and can be utilized as a teaching tool as well as a scoping tool

  17. Scope of radon monitoring for earthquake-studies in India

    International Nuclear Information System (INIS)

    Virk, H.S.

    1994-01-01

    In India, there is scope for investigating and exploiting radon as a precursor for earthquakes and for exploration of hydrocarbon deposits. This report mainly deals with the investigations carried out in Kangra and Chamba valleys of Himachal Pradesh under Himalayan Seismicity Project of Department of Science and Technology, Govt. of India. 20 refs., 4 figs., 1 tab

  18. CSIR ScienceScope: An Energy-secure South Africa

    CSIR Research Space (South Africa)

    CSIR

    2009-06-01

    Full Text Available issues, especially as buildings use more than 25% of national energy consumption. "An Energy-secure South Africa" the theme of this ScienceScope, features a multidisciplinary projects of the R&D work done on alternative energy solutions, clean and cleaner...

  19. 24 CFR 888.301 - Purpose and scope.

    Science.gov (United States)

    2010-04-01

    ..., State Finance Agencies, Section 515 Farmers Home Administration, Section 202 Elderly or Handicapped, and Special Allocations Projects § 888.301 Purpose and scope. (a) Purpose. This subpart describes the basic... Rehabilitation (Part 881); State Finance Agencies (Part 883); and Section 515 Farmers Home Administration (Part...

  20. 36 CFR 294.28 - Scope and applicability.

    Science.gov (United States)

    2010-07-01

    ... SPECIAL AREAS Idaho Roadless Area Management § 294.28 Scope and applicability. (a) After October 16, 2008... National Forest System land issued prior to October 16, 2008. (c) This subpart does not revoke, suspend, or... projects and activities within Idaho Roadless Areas; as shall those related to protection of threatened and...

  1. Yakima/Klickitat Fisheries Project; Washington Department of Fish and Wildlife Policy/Technical Involvement and Planning, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Easterbrooks, John A.; Pearsons, Todd N. (Washington Department of Fish and Wildlife, Olympia, WA)

    2003-03-01

    The Yakima/Klickitat Fisheries Project (YKFP) is a supplementation project sponsored by the Northwest Power Planning Council (Columbia River Basin Fish and Wildlife Program 1994, Measure 7.4K). The objectives of the YKFP are: (1) to test the hypothesis that new supplementation techniques can be used in the Yakima River Basin to increase natural production and to improve harvest opportunities while maintaining the long-term genetic fitness of the wild and native salmonid populations and keeping adverse ecological interactions within acceptable limits (Yakima Fisheries Project Final Environment Impact Statement, 1996); (2) provide knowledge about the use of supplementation, so that it may be used to mitigate effects on anadromous fisheries throughout the Columbia River Basin; (3) to maintain and improve the quantity and productivity of salmon and steelhead habitat, including those areas made accessible by habitat improvements; (4) to ensure that Project implementation remains consistent with the Council's Fish and Wildlife Program; and (5) to implement the Project in a prudent and environmentally sound manner. Current YKFP operations have been designed to test the principles of supplementation (Busack et al. 1997). The Project's experimental design has focused on the following critical uncertainties affecting supplementation: (1) The survival and reproductive success of hatchery fish after release from the hatchery; (2) The impacts of hatchery fish as they interact with non-target species and stocks; and, (3) The effects of supplementation on the long-term genetic fitness of fish stocks. The YKFP endorses an adaptive management policy applied through a project management framework as described in the Yakima/Klickitat Fisheries Project Planning Status Report (1995), Fast and Craig (1997), Clune and Dauble 1991. The project is managed by a Policy Group consisting of a representative of the Yakama Nation (YN, lead agency) and a representative of the Washington

  2. Yakima/Klickitat Fisheries Project; Washington Department of Fish and Wildlife Policy/Technical Involvement and Planning, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Pearsons, Todd N.; Easterbrooks, John A. (Washington Department of Fish and Wildlife, Olympia, WA)

    2003-09-01

    The Yakima/Klickitat Fisheries Project (YKFP) is a supplementation project sponsored by the Northwest Power Planning Council and funded by the Bonneville Power Administration. The YKFP has adopted the definition of supplementation described by Regional Assessment of Supplementation Program (1992), which is ''the use of artificial propagation in an attempt to maintain or increase natural production while maintaining the long-term fitness of the target population, and keeping the ecological and genetic impacts on nontarget populations within specified biological limits''. Recent scientific reviews of hatchery supplementation continue to highlight the experimental nature and risk of supplementation (Independent Scientific Group 1996; National Research Council 1996; Lichatowich 1999; Independent Multidisciplinary Science Team 2000; Independent Scientific Advisory Board 2003; Hatchery Scientific Review Group 2003). In addition, many of these reviews included recommendations about the best ways to operate a supplementation program. Most of these recommendations were already being done or have been incorporated into the YKFP. The objectives of the YKFP are: (1) to test the hypothesis that new supplementation techniques can be used in the Yakima River Basin to increase natural production and to improve harvest opportunities while maintaining the long-term genetic fitness of the wild and native salmonid populations and keeping adverse ecological interactions within acceptable limits (Yakima Fisheries Project Final Environment Impact Statement, 1996); (2) provide knowledge about the use of supplementation, so that it may be used to mitigate effects on anadromous fisheries throughout the Columbia River Basin; (3) to maintain and improve the quantity and productivity of salmon and steelhead habitat, including those areas made accessible by habitat improvements; (4) to ensure that Project implementation remains consistent with the Council's Fish and

  3. 78 FR 68044 - Erie Boulevard Hydropower, L.P.; Notice of Scoping Meetings and Environmental Site Review and...

    Science.gov (United States)

    2013-11-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7320-042] Erie Boulevard Hydropower, L.P.; Notice of Scoping Meetings and Environmental Site Review and Soliciting Scoping Comments.... Date filed: July 1, 2013. d. Applicant: Erie Boulevard Hydropower, L.P. e. Name of Project: Chasm...

  4. 300 Area Revitalization Project Management Plan

    International Nuclear Information System (INIS)

    Downey, H. D.

    1999-01-01

    The 300 Area Revitalization Team has been tasked with the responsibility to develop an integrated path forward for the 300 Area, as part of a commitment stemming from the 300 Area Disposition Workshop that was held on March 17, 1998. The integrated path forward that is needed must ensure that budget, schedule, and work scopes are complementary between the Programs that are involved in the 300Area. This Project Management Plan (PMP) defines the roles and responsibilities, and the overall approach, to development of a prioritized schedule for 300 Area activities that will achieve the end-state condition

  5. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  6. Survey and analysis of satellite-based telemedicine projects involving Japan and developing nations: investigation of transmission rates, channel numbers, and node numbers.

    Science.gov (United States)

    Nakajima, I; Natori, M; Takizawa, M; Kaihara, S

    2001-01-01

    We surveyed interactive telemedicine projects via telecommunications satellite (AMINE-PARTNERS, Post-PARTNERS, and Shinshu University Project using Inmarsat satellites) offered by Japan as assistance to developing countries. The survey helped clarify channel occupation time and data transfer rates. Using our survey results, we proposed an optimized satellite model with VSATs simulating the number of required channels and bandwidth magnitude. For future implementation of VSATs for medical use in developing nations, design of telecommunication channels should take into consideration TCP/IP-based operations. We calculated that one hub station with 30-76 VSATs in developing nation can be operated on bandwidth 6 Mbps using with 128 Kbps videoconferencing system for teleconsultation and teleconference, and linking with Internet.

  7. FedScope Accessions Cubes

    Data.gov (United States)

    Office of Personnel Management — This raw data set provides the actual number of personnel actions ("Transfer-Ins" and "New Hires") that have taken place within a Fiscal Year. The scope of this raw...

  8. Radar Plan Position Indicator Scope

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Radar Plan Position Indicator Scope is the collection of weather radar imagery for the period prior to the beginning of the Next Generation Radar (NEXRAD) system...

  9. Scoping endangered futures

    DEFF Research Database (Denmark)

    Blok, Anders

    2017-01-01

    , in the imaginative politics of climatic projections. To rethink the resultant political aesthetics of climate change, the article maps out the visual, experiential, and affective forms in which endangered climatic futures come to saturate public culture. Such encounters, the article suggests, constitute inter-media...

  10. Knowledge Syntheses in Medical Education: Demystifying Scoping Reviews.

    Science.gov (United States)

    Thomas, Aliki; Lubarsky, Stuart; Durning, Steven J; Young, Meredith E

    2017-02-01

    An unprecedented rise in health professions education (HPE) research has led to increasing attention and interest in knowledge syntheses. There are many different types of knowledge syntheses in common use, including systematic reviews, meta-ethnography, rapid reviews, narrative reviews, and realist reviews. In this Perspective, the authors examine the nature, purpose, value, and appropriate use of one particular method: scoping reviews. Scoping reviews are iterative and flexible and can serve multiple main purposes: to examine the extent, range, and nature of research activity in a given field; to determine the value and appropriateness of undertaking a full systematic review; to summarize and disseminate research findings; and to identify research gaps in the existing literature. Despite the advantages of this methodology, there are concerns that it is a less rigorous and defensible means to synthesize HPE literature. Drawing from published research and from their collective experience with this methodology, the authors present a brief description of scoping reviews, explore the advantages and disadvantages of scoping reviews in the context of HPE, and offer lessons learned and suggestions for colleagues who are considering conducting scoping reviews. Examples of published scoping reviews are provided to illustrate the steps involved in the methodology.

  11. Implementation and assessment of a yeast orphan gene research project: involving undergraduates in authentic research experiences and progressing our understanding of uncharacterized open reading frames.

    Science.gov (United States)

    Bowling, Bethany V; Schultheis, Patrick J; Strome, Erin D

    2016-02-01

    Saccharomyces cerevisiae was the first eukaryotic organism to be sequenced; however, little progress has been made in recent years in furthering our understanding of all open reading frames (ORFs). From October 2012 to May 2015 the number of verified ORFs had only risen from 75.31% to 78%, while the number of uncharacterized ORFs had decreased from 12.8% to 11% (representing > 700 genes still left in this category; http://www.yeastgenome.org/genomesnapshot). Course-based research has been shown to increase student learning while providing experience with real scientific investigation; however, implementation in large, multi-section courses presents many challenges. This study sought to test the feasibility and effectiveness of incorporating authentic research into a core genetics course, with multiple instructors, to increase student learning and progress our understanding of uncharacterized ORFs. We generated a module-based annotation toolkit and utilized easily accessible bioinformatics tools to predict gene function for uncharacterized ORFs within the Saccharomyces Genome Database (SGD). Students were each assigned an uncharacterized ORF, which they annotated using contemporary comparative genomics methodologies, including multiple sequence alignment, conserved domain identification, signal peptide prediction and cellular localization algorithms. Student learning outcomes were measured by quizzes, project reports and presentations, as well as a post-project questionnaire. Our results indicate that the authentic research experience had positive impacts on students' perception of their learning and their confidence to conduct future research. Furthermore, we believe that creation of an online repository and adoption and/or adaptation of this project across multiple researchers and institutions could speed the process of gene function prediction. Copyright © 2015 John Wiley & Sons, Ltd.

  12. Exploring extended scope of practice in dietetics: A systems approach.

    Science.gov (United States)

    Ryan, Dominique; Pelly, Fiona; Purcell, Elizabeth

    2017-09-01

    The aim of this study was to explore health professionals' perceptions of an extended scope of a practice clinic, and develop a framework using a systems approach to facilitate extended scope models across various health settings. A qualitative investigation using semi-structured interviews with four health professionals involved in an extended scope dietitian-led gastroenterology clinic in a hospital in regional Queensland was conducted. A case study design was utilised to investigate interviewees' perceptions of the clinic. Participants were conveniently, purposively sampled. Transcript analysis involved a descriptive analytical approach. Interviewee responses were coded and categorised into themes, and investigator triangulation was used to ensure consistency between individual analyses. A secondary interpretative analysis was conducted where relationships between key themes were mapped to the Systems Engineering Initiative for Patient Safety work system model. Interviewees identified various factors as vital inputs to the work system. These were categorised into the four key elements: stakeholder support, resources, planning and the dietitian. Clinic outcomes were categorised into the impact on four key groups: patients, the dietitian, the multidisciplinary team and the health system. Mapping of the relationships between inputs and outcomes resulted in an implementation framework for extended scope of practice. Extended scope of practice in dietetics may provide positive outcomes for various stakeholders. However, further development of extended scope roles for dietitians requires increased advocacy and support from governments, professional bodies, training institutions and dietitians. We have developed an implementation framework which can be utilised by health professionals interested in embracing an extended scope model of care. © 2016 Dietitians Association of Australia.

  13. Application of unconventional geoelectrical methods to the hydrogeological examination of the Mt. S. Croce rock formations (Umbria, Italy involved in a railway tunnel project

    Directory of Open Access Journals (Sweden)

    D. Patella

    1994-06-01

    Full Text Available he project of doubling and developing of the railway line Orte-Falconara, committed by the Italian State Railway Company to the COMAVI Consortium (Rome, Italy, envisaged building the Mt. S. Croce tunnel, about 3200 m long between the stations of Narni and Nera Montoro (Umbria, ltaly. During the last phase of the feasibility project, a geophysical research based on geoelectrical prospecting methods was carried out to complement other geognostic investigations with the following goals: a to outline the complex geotectonic model of the rock system, which will be affected by the new railway layout; b to gain information on the hydrogeologic features of the survey area, in relation to the existing geologic situation and the consequent effects on the digging conditions of the tunnel and on the operation conditions of the railway layout. The geophysical work was thus organized according to the following scheme: a execution of dipole electrical sounding pro-files, to depict a series of significant tomographic pseudosections, both across and along the new railway layout; b execution of self-potential measurements, to draw an anomaly map over the whole hydrogeological network system in the survey area. The research provided information which has helped to improve the geological-structural model of the area and disclosed the hydrogelogic network, conforming to the classified field surface manifestations. At present, further detailed field investigations are being carried out, which confirm all the results obtained by the geoelectrical survey.

  14. High participation rate among 25 721 patients with broad age range in a hospital-based research project involving whole-genome sequencing - the Lausanne Institutional Biobank.

    Science.gov (United States)

    Bochud, Murielle; Currat, Christine; Chapatte, Laurence; Roth, Cindy; Mooser, Vincent

    2017-10-24

    We aimed to evaluate the interest of adult inpatients and selected outpatients in engaging in a large, real-life, hospital-based, genomic medicine research project and in receiving clinically actionable incidental findings. Within the framework of the cross-sectional Institutional Biobank of Lausanne, Switzerland, a total of 25721 patients of the CHUV University Hospital were systematically invited to grant researchers access to their biomedical data and to donate blood for future analyses, including whole-genome sequencing. Multivariable logistic regression analysis was used to identify personal factors, including age, gender, religion, ethnicity, citizenship, education level and mode of admission, associated with willingness to participate in this genomic research project and with interest in receiving clinically actionable incidental findings. The overall participation rate was 79% (20343/25721). Participation rate declined progressively with age, averaging 83%, 75%, 67% and 62% in patients aged rate, but not with higher willingness to receive incidental findings within the population who had agreed to participate. A large proportion of adult patients, even among the elderly, are willing to actively participate and receive incidental findings in this systematic hospital-based precision and genomic medicine research program with broad consent.

  15. Building "Applied Linguistic Historiography": Rationale, Scope, and Methods

    Science.gov (United States)

    Smith, Richard

    2016-01-01

    In this article I argue for the establishment of "Applied Linguistic Historiography" (ALH), that is, a new domain of enquiry within applied linguistics involving a rigorous, scholarly, and self-reflexive approach to historical research. Considering issues of rationale, scope, and methods in turn, I provide reasons why ALH is needed and…

  16. A rural community's involvement in the design and usability testing of a computer-based informed consent process for the Personalized Medicine Research Project.

    Science.gov (United States)

    Mahnke, Andrea N; Plasek, Joseph M; Hoffman, David G; Partridge, Nathan S; Foth, Wendy S; Waudby, Carol J; Rasmussen, Luke V; McManus, Valerie D; McCarty, Catherine A

    2014-01-01

    Many informed consent studies demonstrate that research subjects poorly retain and understand information in written consent documents. Previous research in multimedia consent is mixed in terms of success for improving participants' understanding, satisfaction, and retention. This failure may be due to a lack of a community-centered design approach to building the interventions. The goal of this study was to gather information from the community to determine the best way to undertake the consent process. Community perceptions regarding different computer-based consenting approaches were evaluated, and a computer-based consent was developed and tested. A second goal was to evaluate whether participants make truly informed decisions to participate in research. Simulations of an informed consent process were videotaped to document the process. Focus groups were conducted to determine community attitudes towards a computer-based informed consent process. Hybrid focus groups were conducted to determine the most acceptable hardware device. Usability testing was conducted on a computer-based consent prototype using a touch-screen kiosk. Based on feedback, a computer-based consent was developed. Representative study participants were able to easily complete the consent, and all were able to correctly answer the comprehension check questions. Community involvement in developing a computer-based consent proved valuable for a population-based genetic study. These findings may translate to other types of informed consents, including those for trials involving treatment of genetic disorders. A computer-based consent may serve to better communicate consistent, clear, accurate, and complete information regarding the risks and benefits of study participation. Additional analysis is necessary to measure the level of comprehension of the check-question answers by larger numbers of participants. The next step will involve contacting participants to measure whether understanding of

  17. Subject categories and scope descriptions

    International Nuclear Information System (INIS)

    2002-01-01

    This document is one in a series of publications known as the ETDE/INIS Joint Reference Series. It defines the subject categories and provides the scope descriptions to be used for categorization of the nuclear literature for the preparation of INIS and ETDE input by national and regional centres. Together with the other volumes of the INIS Reference Series it defines the rules, standards and practices and provides the authorities to be used in the International Nuclear Information System and ETDE. A complete list of the volumes published in the INIS Reference Series may be found on the inside front cover of this publication. This INIS/ETDE Reference Series document is intended to serve two purposes: to define the subject scope of the International Nuclear Information System (INIS) and the Energy Technology Data Exchange (ETDE) and to define the subject classification scheme of INIS and ETDE. It is thus the guide to the inputting centres in determining which items of literature should be reported, and in determining where the full bibliographic entry and abstract of each item should be included in INIS or ETDE database. Each category is identified by a category code consisting of three alphanumeric characters. A scope description is given for each subject category. The scope of INIS is the sum of the scopes of all the categories. With most categories cross references are provided to other categories where appropriate. Cross references should be of assistance in finding the appropriate category; in fact, by indicating topics that are excluded from the category in question, the cross references help to clarify and define the scope of the category to which they are appended. A Subject Index is included as an aid to subject classifiers, but it is only an aid and not a means for subject classification. It facilitates the use of this document, but is no substitute for the description of the scope of the subject categories

  18. Potential for Australian involvement in ITER

    International Nuclear Information System (INIS)

    O'Connor, D. J.; Collins, G. A.; Hole, M. J.

    2006-01-01

    Full text: Full text: Fusion, the process that powers the sun and stars, offers a solution to the world's long-term energy needs: providing large scale energy production with zero greenhouse gas emissions, short-lived radio-active waste compared to conventional nuclear fission cycles, and a virtually limitless supply of fuel. Almost three decades of fusion research has produced spectacular progress. Present-day experiments have a power gain ratio of approximately 1 (ratio of power out to power in), with a power output in the 10's of megawatts. The world's next major fusion experiment, the International Thermonuclear Experimental Reactor (ITER), will be a pre-prototype power plant. Since announcement of the ITER site in June 2005, the ITER project, has gained momentum and political support. Despite Australia's foundation role in the field of fusion science, through the pioneering work of Sir Mark Oliphant, and significant contributions to the international fusion program over the succeeding years, Australia is not involved in the ITER project. In this talk, the activities of a recently formed consortium of scientists and engineers, the Australian ITER Forum will be outlined. The Forum is drawn from five Universities, ANSTO (the Australian Nuclear Science and Technology Organisation) and AINSE (the Australian Institute for Nuclear Science and Engineering), and seeks to promote fusion energy in the Australian community and negotiate a role for Australia in the ITER project. As part of this activity, the Australian government recently funded a workshop that discussed the ways and means of engaging Australia in ITER. The workshop brought the research, industrial, government and general public communities, together with the ITER partners, and forged an opportunity for ITER engagement; with scientific, industrial, and energy security rewards for Australia. We will report on the emerging scope for Australian involvement

  19. Educating the Public Health Workforce: A Scoping Review

    Directory of Open Access Journals (Sweden)

    Donghua Tao

    2018-02-01

    Full Text Available The aim of this scoping review was to identify and characterize the recent literature pertaining to the education of the public health workforce worldwide. The importance of preparing a public health workforce with sufficient capacity and appropriate capabilities has been recognized by major organizations around the world (1. Champions for public health note that a suitably educated workforce is essential to the delivery of public health services, including emergency response to biological, manmade, and natural disasters, within countries and across the globe. No single repository offers a comprehensive compilation of who is teaching public health, to whom, and for what end. Moreover, no international consensus prevails on what higher education should entail or what pedagogy is optimal for providing the necessary education. Although health agencies, public or private, might project workforce needs, the higher level of education remains the sole responsibility of higher education institutions. The long-term goal of this study is to describe approaches to the education of the public health workforce around the world by identifying the peer-reviewed literature, published primarily by academicians involved in educating those who will perform public health functions. This paper reports on the first phase of the study: identifying and categorizing papers published in peer-reviewed literature between 2000 and 2015.

  20. Involving migrants in the development of guidelines for communication in cross-cultural general practice consultations: a participatory learning and action research project.

    Science.gov (United States)

    O'Reilly-de Brún, Mary; MacFarlane, Anne; de Brún, Tomas; Okonkwo, Ekaterina; Bonsenge Bokanga, Jean Samuel; Manuela De Almeida Silva, Maria; Ogbebor, Florence; Mierzejewska, Aga; Nnadi, Lovina; van den Muijsenbergh, Maria; van Weel-Baumgarten, Evelyn; van Weel, Chris

    2015-09-21

    The aim of this research was to involve migrants and other key stakeholders in a participatory dialogue to develop a guideline for enhancing communication in cross-cultural general practice consultations. In this paper, we focus on findings about the use of formal versus informal interpreters because dialogues about these issues emerged as central to the identification of recommendations for best practice. This qualitative case study involved a Participatory Learning and Action (PLA) research methodology. The sample comprised 80 stakeholders: 51 from migrant communities; 15 general practitioners (GPs) and general practice staff; 7 established migrants as peer researchers; 5 formal, trained interpreters; and 2 service planners from the national health authority. Galway, Ireland. There was 100% consensus across stakeholder groups that while informal interpreters have uses for migrants and general practice staff, they are not considered acceptable as best practice. There was also 100% consensus that formal interpreters who are trained and working as per a professional code of practice are acceptable as best practice. Policymakers and service planners need to work in partnership with service providers and migrants to progress the implementation of professional, trained interpreters as a routine way of working in general practice. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  1. When Serious Project Management is a Critical Business Requirement

    Science.gov (United States)

    Jansma, P. A.; Gibby, L.; Chambers, C.; Joines, J.; Egger, R.

    2000-01-01

    When serious project management is a critical business requirement, project managers need to integrate cost, schedule and technical scope of work across the project, and apply earned value management (EVM).

  2. Residential ventilation standards scoping study

    Energy Technology Data Exchange (ETDEWEB)

    McKone, Thomas E.; Sherman, Max H.

    2003-10-01

    The goals of this scoping study are to identify research needed to develop improved ventilation standards for California's Title 24 Building Energy Efficiency Standards. The 2008 Title 24 Standards are the primary target for the outcome of this research, but this scoping study is not limited to that timeframe. We prepared this scoping study to provide the California Energy Commission with broad and flexible options for developing a research plan to advance the standards. This document presents the findings of a scoping study commissioned by the Public Interest Energy Research (PIER) program of the California Energy Commission to determine what research is necessary to develop new residential ventilation requirements for California. This study is one of three companion efforts needed to complete the job of determining the ventilation needs of California residences, determining the bases for setting residential ventilation requirements, and determining appropriate ventilation technologies to meet these needs and requirements in an energy efficient manner. Rather than providing research results, this scoping study identifies important research questions along with the level of effort necessary to address these questions and the costs, risks, and benefits of pursuing alternative research questions. In approaching these questions and corresponding levels of effort, feasibility and timing were important considerations. The Commission has specified Summer 2005 as the latest date for completing this research in time to update the 2008 version of California's Energy Code (Title 24).

  3. Vermont's involvement with the DOE's high-level radioactive waste disposal crystalline repository project. Final technical report, January 1-September 30, 1986

    International Nuclear Information System (INIS)

    1986-09-01

    The US Department of Energy (DOE) is charged with siting a second repository for the disposal of highly radioactive nuclear wastes. Because of this siting process, the DOE has looked to localities in 17 states in the eastern US for possible sites in crystalline rock. During the beginning of the progress report period, crystalline rocks in Vermont were under consideration as sites for further study. Vermont, through the Vermont State Geologist's Office, was closely involved with the DOE program during this period. Our main function has been to review DOE reports; attend DOE workshops and meetings; and inform the Vermont public, with the help of the DOE, about the high-level nuclear waste repository siting process. Nine sites in Vermont were under consideration during the Regional Characterization Phase until January 16, 1986. Because of this fact, there was considerable public interest in this program. Upon release of the Draft Area Recommendation Report, Vermont crystalline rock bodies were dropped from consideration. A site in New Hampshire and two sites in Maine remained on the list. Because of the draft status of the report and the possibility that a site 20 miles from the Vermont border in New Hampshire could remain as a selected site, Vermont has stayed active and interested. Two briefings and hearings were held in the State during the comment period January 16 through April 16, 1986. A thorough review of the Draft Area Recommendation Report was completed using reviewers from our Office, State agencies, outside experts, and citizen groups. With the announcement on May 28, 1986 of the suspension of the second repository siting process in crystalline rocks, our Office has worked toward closing out our active involvement

  4. Requirements Analysis Study for Master Pump Shutdown System Project Development Specification [SEC 1 and 2

    International Nuclear Information System (INIS)

    BEVINS, R.R.

    2000-01-01

    This document has been updated during the definitive design portion of the first phase of the W-314 Project to capture additional software requirements and is planned to be updated during the second phase of the W-314 Project to cover the second phase of the Project's scope. The objective is to provide requirement traceability by recording the analysis/basis for the functional descriptions of the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment

  5. The EarthScope Plate Boundary Observatory: Bringing Low Latency Data From Unimak Island, Alaska

    Science.gov (United States)

    Feaux, K.; Mencin, D.; Jackson, M.; Gallaher, W.; Pauk, B.; Smith, S.

    2008-05-01

    The Plate Boundary Observatory (PBO), part of the NSF-funded EarthScope project, will complete the installation of a fourteen station GPS network on Unimak Island, Alaska in August, 2008. The primary data communications goal of the project is to design and implement a robust data communications network capable of downloading 15-sec daily GPS files and streaming 1 Hz GPS data, via Ustream, from Unimak Island to three data relay points in the Aleutian chain. As part of the permitting agreement with the landowner, PBO will co-locate the GPS stations with existing USGS seismic stations. The technical challenges involved in optimizing the data communications network for both the GPS data and the seismic data will be presented. From Unimak island, there will be three separate data telemetry paths: 1) West through a radio repeater on Akutan volcano to a VSAT in Akutan village, 2) East through a radio repeater to a T1 connection in Cold Bay, AK, 3) South through a radio repeater to a VSAT at an existing PBO GPS station in King Cove, AK. The difficulties involved in the project include complex network geometries with multiple radio repeaters, long distance RF transmission over water, hardware bandwidth limitations, power limitations, space limitations, as well as working in bear country on an incredibly remote and active volcano.

  6. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  7. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  8. Parental involvement

    Directory of Open Access Journals (Sweden)

    Ezra S Simon

    2005-01-01

    Full Text Available Parent-Teacher Associations and other community groups can play a significant role in helping to establish and run refugee schools; their involvement can also help refugee adults adjust to their changed circumstances.

  9. CMS Phase II Upgrade Scope Document

    CERN Document Server

    Butler, J; Klute, M; Mans, J; Silvestris, L; on behalf of the CMS, Collaboration; CERN. Geneva. The LHC experiments Committee; LHCC

    2015-01-01

    The High-Luminosity LHC (HL-LHC) has been identified as the highest priority program in High Energy Physics by both the European Strategy Group and the US Particle Physics Project Prioritization Panel. To fulfil the full potential of this program, which includes the study of the nature of the Higgs boson, the investigation of the properties of any newly discovered particles in the upcoming LHC runs, and the extension of the mass reach for further discoveries, an integrated luminosity of 3000 fb-1 will have to be accumulated by the end of the program. In preparation for operation at the HL-LHC , CMS has documented the necessary upgrades and their expected costs in a Technical Proposal submitted to the CERN LHC Committee (LHCC) in mid-2015. The material presented in the current “Scope Document” provides additional information to assist the LHCC and the CERN Resource Review Board (RRB) in their review of the CMS upgrade. The document commences with a summary of the process followed to develop the scope of t...

  10. Remedial action and waste disposal project -- 300-FF-1 remedial action readiness assessment plan

    International Nuclear Information System (INIS)

    April, J.G.; Carlson, R.A.; Greif, A.A.; Johnson, C.R.; Orewiler, R.I.; Perry, D.M.; Plastino, J.C.; Roeck, F.V.; Tuttle, B.G.

    1997-04-01

    This Readiness Assessment Plan presents the methodology used to assess the readiness of the 300-FF-1 Remedial Action Project. Remediation involves the excavation, treatment if applicable, and final disposal of contaminated soil and debris associated with the waste sites in the 300-FF-1 Operable Unit. The scope of the 300-FF-1 remediation is to excavate, transport, and dispose of contaminated solid from sites identified in the 300-FF-1 Operable Unit

  11. Amoco-US Environmental Protection Agency, pollution prevention project, Yorktown, Virginia: Project peer review. Report of the Peer Review Committee of the Amoco/EPA Pollution Prevention Project at the Yorktown, Virginia refinery

    International Nuclear Information System (INIS)

    Klee, H.; Podar, M.

    1991-01-01

    The Amoco/EPA Pollution Prevention Project involved a number of representatives from federal and Virginia regulatory agencies, and Amoco's refining business. Participants believed that the Project could benefit from a broader perspective than these organizations along might provide. The Project Work Group selected an independent Peer Review Process which was conducted by Resource for the Future (RFF), a Washington DC think tank. A group of technical, policy and environmental experts from diverse backgrounds served as Peer Review members. The Peer Review Committee met on three occasions to discuss (1) the Project Work Plan (2) sampling data and interpretation and (3) project conclusions and recommendations. The focus of the meeting was on the general scope and content of the project

  12. Developments of STR project in the scope of teleoperation handling robotic for the operation in Spanish nuclear facilities; Desarrollos del proyecto SRT en el area de manipulacion robotica teleoperada para la operacion de las instalaciones nucleares espanolas

    Energy Technology Data Exchange (ETDEWEB)

    Bielza, M [ENDESA (Spain); Gomez Santamaria, J [IBERDROLA (Spain); Izquierdo, J A [C.N. COFRENTES (Spain); Martinez, S [C.N. ASCO (Spain); Linares, F [ENSA (Spain); Avello, A [CEIT (Spain); Gago, M J [IBRINCO (Spain)

    1998-12-01

    The main objective of the Teleoperated Robotic Systems project (SRT) is the development of teleoperated robotic systems for use in the inspection, surveillance and maintenance operations in nuclear and radioactive installations. These systems make possible the reduction of the individual and collective doses of the workers that undertake these operations, as well as an increase of plant availability as it is possible to carry out specific tasks of inspection and surveillance in high radiation dose areas without having to reduce the power of the installation. This project started in 1995, deciding to priorize the inspection equipment in a first phase. When this work were advanced, the development of the manipulation activities was carried out to being consider the nuclear installations needs. As a result of this work, the manipulation requirements were elaborated in order to prepare the beginning technical specifications to design the equipment s. These developments are based on a fixed manipulator which is located closed to the equipment that we want to repair, and an arm manipulator which moves by caterpillars, it is easier to control than others; and the navigation system which allows the robot self-locating in the complex area. In this paper the conclusions about the manipulation requirements are described, as well as the state of the manipulation prototype. (Author)

  13. REBUILD AMERICA PROGRAM SCOPE OF WORK

    Energy Technology Data Exchange (ETDEWEB)

    Jeffrey Brown; Bruce Exstrum

    2004-12-01

    This report summarizes the activities carried out by Aspen Systems Corporation in support of the Department of Energy's Rebuild America program during the period from October 9, 1999 to October 31, 2004. These activities were in accordance with the Scope of Work contained in a GSA MOBIS schedule task order issued by the National Energy Technology Laboratory. This report includes descriptions of activities and results in the following areas: deployment/delivery model; program and project results; program representative support activities; technical assistance; web site development and operation; business/strategic partners; and training/workshop activities. The report includes conclusions and recommendations. Five source documents are also provided as appendices.

  14. Multidominance, ellipsis, and quantifier scope

    NARCIS (Netherlands)

    Temmerman, Tanja Maria Hugo

    2012-01-01

    This dissertation provides a novel perspective on the interaction between quantifier scope and ellipsis. It presents a detailed investigation of the scopal interaction between English negative indefinites, modals, and quantified phrases in ellipsis. One of the crucial observations is that a negative

  15. Commercial Art: Scope and Sequence.

    Science.gov (United States)

    Nashville - Davidson County Metropolitan Public Schools, TN.

    This scope and sequence guide, developed for a commercial art vocational education program, represents an initial step in the development of a systemwide articulated curriculum sequence for all vocational programs within the Metropolitan Nashville Public School System. It was developed as a result of needs expressed by teachers, parents, and the…

  16. Wikis and Collaborative Writing Applications in Health Care: A Scoping Review Protocol

    Science.gov (United States)

    van de Belt, Tom H; Grajales III, Francisco J; Eysenbach, Gunther; Aubin, Karine; Gold, Irving; Gagnon, Marie-Pierre; Kuziemsky, Craig E; Turgeon, Alexis F; Poitras, Julien; Faber, Marjan J; Kremer, Jan A.M; Heldoorn, Marcel; Bilodeau, Andrea; Légaré, France

    2012-01-01

    (KTA) framework to describe and compare the various studies and collaborative writing projects we find. In addition to guiding the use of collaborative writing applications in health care, this scoping review will advance the science of KT by testing tools that could be used to evaluate other social media. We also expect to identify areas that require further systematic reviews and primary research and to produce a highly relevant research agenda that explores and leverages the potential of collaborative writing software. To date, this is the first study to use the KTA framework to study the role collaborative writing applications in KT, and the first to involve three national and international institutional knowledge users as part of the research process. PMID:23612481

  17. SCOPE: a scorecard for osteoporosis in Europe.

    Science.gov (United States)

    Kanis, J A; Borgström, F; Compston, J; Dreinhöfer, K; Nolte, E; Jonsson, L; Lems, W F; McCloskey, E V; Rizzoli, R; Stenmark, J

    2013-01-01

    The scorecard summarises key indicators of the burden of osteoporosis and its management in each of the member states of the European Union. The resulting scorecard elements were then assembled on a single sheet to provide a unique overview of osteoporosis in Europe. The scorecard for osteoporosis in Europe (SCOPE) is an independent project that seeks to raise awareness of osteoporosis care in Europe. The aim of this project was to develop a scorecard and background documents to draw attention to gaps and inequalities in the provision of primary and secondary prevention of fractures due to osteoporosis. The SCOPE panel reviewed the information available on osteoporosis and the resulting fractures for each of the 27 countries of the European Union (EU27). The information researched covered four domains: background information (e.g. the burden of osteoporosis and fractures), policy framework, service provision and service uptake e.g. the proportion of men and women at high risk that do not receive treatment (the treatment gap). There was a marked difference in fracture risk among the EU27. Of concern was the marked heterogeneity in the policy framework, service provision and service uptake for osteoporotic fracture that bore little relation to the fracture burden. For example, despite the wide availability of treatments to prevent fractures, in the majority of the EU27, only a minority of patients at high risk receive treatment for osteoporosis even after their first fracture. The elements of each domain in each country were scored and coded using a traffic light system (red, orange, green) and used to synthesise a scorecard. The resulting scorecard elements were then assembled on a single sheet to provide a unique overview of osteoporosis in Europe. The scorecard will enable healthcare professionals and policy makers to assess their country's general approach to the disease and provide indicators to inform future provision of healthcare.

  18. Constrained bayesian inference of project performance models

    OpenAIRE

    Sunmola, Funlade

    2013-01-01

    Project performance models play an important role in the management of project success. When used for monitoring projects, they can offer predictive ability such as indications of possible delivery problems. Approaches for monitoring project performance relies on available project information including restrictions imposed on the project, particularly the constraints of cost, quality, scope and time. We study in this paper a Bayesian inference methodology for project performance modelling in ...

  19. 32 CFR 651.48 - Scoping process.

    Science.gov (United States)

    2010-07-01

    ... significantly affecting the environment will go through scoping unless extenuating circumstances make it... associated environmental controversy. (4) Importance of the affected environmental parameters. (5... the affected Army organization or installation. Such integration is encouraged. (f) Scoping procedures...

  20. The High Scope Approach To Early Learning

    OpenAIRE

    French, Geraldine

    2012-01-01

    Learning Objectives: After studying this chapter the reader should be able to: • Describe the historical origins, the longitudinal research, and the theoretical underpinnings of the HighScope approach. • Identify the teaching strategies adopted by HighScope educators. • Appreciate the curriculum content. • Understand the HighScope approach to the assessment of children’s learning. • Consider some criticisms of the HighScope research and approach to early learning. This ...

  1. SRP decontamination and decommissioning scoping study

    International Nuclear Information System (INIS)

    Martin, W.P.

    1986-06-01

    Of the approximately 3000 site facilities, 496 were judged to be radioactively contaminated thereby requiring Decontamination and Decommissioning (D and D) after shutdown. To enable projection of D and D timing for each of the 496 facilities, a plant shutdown schedule was developed. A 5-year ''cool-down'' period was added to the highly contaminated facilities to allow radioactive decay resulting in a reduction of cost, waste volume, and radiation exposure. D and D of all facilities is projected to be completed in FY 2045. Since essentially all of the plant facilities are scheduled to operate past FY 2000, only seventy-four of the 496 facilities are projected to be decommissioned prior to FY 2000. These facilities include currently excessed facilities and those scheduled for shutdown in the near future - seepage basins, HWCTR, R-Reactor, high level waste tanks, etc. The type of D and D chosen is the factor having the most significant effect on D and D costs and waste volumes. The two types of final D and D are Entombment and Dismantlement. Dismantlement can increase costs and waste volumes by a factor of 2 to 100 compared to Entombment. This point should be kept in mind when reviewing this scoping study as approximately 75% of the projects are estimated based upon the less costly Entombment option. The D and D estimates for the 496 facilities are summarized by plant area in Table 3 and by custodian group (Program/General Department) in Table 4. The total estimated D and D cost in constant FY 1986 dollars is approximately $800,000,000, with total solid waste volumes of 5,000,000 and 170,000 cubic feet, for low level waste (LLW) and transuranic waste (TRU), respectively. A 6% annual escalation factor increases the total project costs of 800,000,000, FY 1986 dollars to 7 billion dollars. 27 refs

  2. Making Patent Scopes Exceed the Technological Scopes of Scientific Inventions

    DEFF Research Database (Denmark)

    Beukel, Karin

    This paper presents the results of a grounded theory study of the transformation of scientific discoveries into patented inventions. Using an algebraic interpretive approach, the narratives collected during interviews are analyzed as Bayesian inferences and the developed theory is tested. The fin...... for searching in new directions for solutions if challenges of exploitation with regard to the scientific invention arise.......This paper presents the results of a grounded theory study of the transformation of scientific discoveries into patented inventions. Using an algebraic interpretive approach, the narratives collected during interviews are analyzed as Bayesian inferences and the developed theory is tested....... The findings recast the relationship between science and patents as a process in which the way the transformation of the scientific invention is handled has an effect on the breadth of the patent scope. Unleashing patent scope surplus is dependent on processes related to abstraction and cognitive variety...

  3. Investigation of the Relationship between Green Design and Project Delivery Methods

    Energy Technology Data Exchange (ETDEWEB)

    Bilec, Melissa M.; Ries, Robert J.

    2008-04-24

    The selection of the project delivery method (PDM) for any project is critical--it establishes communication, coordination, and contractual issues between the owner, contractor, and designer. With an increase in the number of green design projects, understanding the relationship between the PDM and green design is paramount to project and contract management. It is reasonable to assume that a positive relationship between green design and design-build (DB) exists since both theoretically are intended to foster an integrated, holistic, and collaborative project. This research examines the relationship between the design-bid-build (DBB), construction management (CM), and DB PDMs and green design with the goal of establishing best practices and identifying potential synergies between them. The research collected information by conducting primarily telephone interviews with approximately twenty-five individuals, including owners, contractors, and designers involved in completed green design projects, mainly in the public sector. The interviews developed a general understanding of the current state of knowledge and experience and not a rigorous quantitative analysis. Upon completion of the interviews, the tabulated results were summarized and green project characteristics and project-PDM interactions emerged. Existing published research was evaluated to reveal aspects of PDMs independent of green design. Best practices were ascertained by combining information from the interviews and published research. Best practices are as follows: (1) Project implementation features--The decision to use DB as PDM on green design or other projects should be based on the specific project features; e.g., well-defined scope and adequate owner staffing. DB will not produce successful results on all projects. (2) Collaboration--Project team collaboration early in the design and construction process is an important aspect of green projects, and collaboration was considered somewhat more

  4. 32 CFR 989.18 - Scoping.

    Science.gov (United States)

    2010-07-01

    ... ANALYSIS PROCESS (EIAP) § 989.18 Scoping. (a) After publication of the NOI for an EIS, the EPF must... public. The result of scoping is that the proponent and EPF determine the range of actions, alternatives, and impacts to be considered in the EIS (40 CFR 1508.25). The EPF must send scripts for scoping...

  5. Inclusive Briefing and User Involvement

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2011-01-01

    Briefing is not just about specifying needs as requirements but also about evaluating how well design proposals fulfil needs and aspirations. Furthermore, briefing is not only about building design. Briefing starts at the preproject stage to create a basis for the project decision and can include...... by top management. The article describes the briefing processes and the methods for user involvement, identifies problem areas and points out possible improvements. The author was actively involved in the project as deputy project director, with responsibility for the briefing process, and is now...... includes a literature study on briefing and user involvement in building projects, and presents a case study of a major building project of a new headquarters and media centre for the Danish Broadcasting Corporation in Copenhagen. The building project was actively used as part of a corporate change process...

  6. Scrum Project Management

    CERN Document Server

    Pries, Kim H

    2010-01-01

    Scrum, which was originally invented solely for software development, can now be applied to all types of projects. This book shows project managers how to implement Scrum by explaining the artifacts, rituals, and roles used. The text provides Scrum planning methods to control project scope and schedule as well as Scrum tracking methods to focus teams on improving throughput and streamlining communications. The authors show how to combine traditional project methods with Scrum and how to adapt the familiar work breakdown structure to create Scrum backlogs and sprints. They also demonstrate how

  7. 78 FR 54884 - Antrim County; Notice of Intent To Prepare an Environmental Assessment and Notice of Scoping...

    Science.gov (United States)

    2013-09-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3030-019] Antrim County; Notice of Intent To Prepare an Environmental Assessment and Notice of Scoping Meeting and Environmental Site Review and Soliciting Scoping Comments Take notice that the following hydroelectric application has been filed with the Commission and is...

  8. 75 FR 71122 - Erie Boulevard Hydropower L.P.; Notice of Scoping Meetings and Environmental Site Review

    Science.gov (United States)

    2010-11-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7518-012--New York] Erie Boulevard Hydropower L.P.; Notice of Scoping Meetings and Environmental Site Review November 15, 2010. Commission staff will be conducting two public scoping meetings and an environmental site review in support...

  9. Yakima/Klickitat Fisheries Project: Short Project Overview of Spring Chinook Salmon Supplementation in the Upper Yakima Basin; Washington Department of Fish and Wildlife Policy/Technical Involvement and Planning, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Fast, David E.; Bosch, William J.

    2005-09-01

    The Yakima/Klickitat Fisheries Project (YKFP) is on schedule to ascertain whether new artificial production techniques can be used to increase harvest and natural production of spring Chinook salmon while maintaining the long-term genetic fitness of the fish population being supplemented and keeping adverse genetic and ecological interactions with non-target species or stocks within acceptable limits. The Cle Elum Supplementation and Research Facility (CESRF) collected its first spring chinook brood stock in 1997, released its first fish in 1999, and age-4 adults have been returning since 2001. In these initial years of CESRF operation, recruitment of hatchery origin fish has exceeded that of fish spawning in the natural environment, but early indications are that hatchery origin fish are not as successful at spawning in the natural environment as natural origin fish when competition is relatively high. When competition is reduced, hatchery fish produced similar numbers of progeny as their wild counterparts. Most demographic variables are similar between natural and hatchery origin fish, however hatchery origin fish were smaller-at-age than natural origin fish. Long-term fitness of the target population is being evaluated by a large-scale test of domestication. Slight changes in predation vulnerability and competitive dominance, caused by domestication, were documented. Distribution of spawners has increased as a result of acclimation site location and salmon homing fidelity. Semi-natural rearing and predator avoidance training have not resulted in significant increases in survival of hatchery fish. However, growth manipulations in the hatchery appear to be reducing the number of precocious males produced by the YKFP and consequently increasing the number of migrants. Genetic impacts to non-target populations appear to be low because of the low stray rates of YKFP fish. Ecological impacts to valued non-target taxa were within containment objectives or impacts that

  10. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD. INTEGRATED DISPOSAL FACILITY (IDF)

    International Nuclear Information System (INIS)

    MCLELLAN, G.W.

    2007-01-01

    permitting, scheduling, costs, stakeholders and technical issues. To meet the customer's needs and deadlines, the project was managed with conscientious discipline and application of sound project management principles in the Project Management Institute's Project Management Body of Knowledge. Several factors contributed to project success. Extensive planning and preparation were conducted, which was instrumental to contract and procurement management. Anticipating issues and risks, CH2M HILL prepared well defined scope and expectations, particularly for safety. To ensure worker safety, the project management team incorporated CH2M HILL's Integrated Safety Management System (ISMS) into the project and included safety requirements in contracting documents and baseline planning. The construction contractor DelHur Industries, Inc. adopted CH2M HILL's safety program to meet the procurement requirement for a comparable ISMS safety program. This project management approach contributed to an excellent safety record for a project with heavy equipment in constant motion and 63,555 man-hours worked. The project manager worked closely with ORP and Ecology to keep them involved in project decisions and head off any stakeholder or regulatory concerns. As issues emerged, the project manager addressed them expeditiously to maintain a rigorous schedule. Subcontractors and project contributors were held to contract commitments for performance of the work scope and requirements for quality, budget and schedule. Another element of project success extended to early and continual involvement of all interested in the project scope. Due to the public sensitivity of constructing a landfill planned for radioactive waste as well as offsite waste, there were many stakeholders and it was important to secure their agreement on scope and time frames. The project had multiple participants involved in quality assurance surveillances, audits and inspections, including the construction contractor, CH2M HILL

  11. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD INTEGRATED DISPOSAL FACILITY (IDF)

    Energy Technology Data Exchange (ETDEWEB)

    MCLELLAN, G.W.

    2007-02-07

    issues as well as challenges with permitting, scheduling, costs, stakeholders and technical issues. To meet the customer's needs and deadlines, the project was managed with conscientious discipline and application of sound project management principles in the Project Management Institute's Project Management Body of Knowledge. Several factors contributed to project success. Extensive planning and preparation were conducted, which was instrumental to contract and procurement management. Anticipating issues and risks, CH2M HILL prepared well defined scope and expectations, particularly for safety. To ensure worker safety, the project management team incorporated CH2M HILL's Integrated Safety Management System (ISMS) into the project and included safety requirements in contracting documents and baseline planning. The construction contractor DelHur Industries, Inc. adopted CH2M HILL's safety program to meet the procurement requirement for a comparable ISMS safety program. This project management approach contributed to an excellent safety record for a project with heavy equipment in constant motion and 63,555 man-hours worked. The project manager worked closely with ORP and Ecology to keep them involved in project decisions and head off any stakeholder or regulatory concerns. As issues emerged, the project manager addressed them expeditiously to maintain a rigorous schedule. Subcontractors and project contributors were held to contract commitments for performance of the work scope and requirements for quality, budget and schedule. Another element of project success extended to early and continual involvement of all interested in the project scope. Due to the public sensitivity of constructing a landfill planned for radioactive waste as well as offsite waste, there were many stakeholders and it was important to secure their agreement on scope and time frames. The project had multiple participants involved in quality assurance surveillances, audits and

  12. Involvement Without Participation?

    DEFF Research Database (Denmark)

    Olsén, Peter

    2012-01-01

    The article presents a case study of a knowledge-intensive company that launched a 2-year project to improve their psychosocial working environment. All parties agreed on the project, and the methods used aimed to promote the involvement of the employees. Surprisingly, the psychosocial working...... environment did not improve; on the contrary, it deteriorated. The article highlights cultural and structural obstacles to the process, including an inadequate understanding of organisational learning and a narrow focus on market and competition. The endeavours did not consistently increase delegation...

  13. 75 FR 35020 - Wilkesboro Hydroelectric Company, LLC; Notice Soliciting Scoping Comments

    Science.gov (United States)

    2010-06-21

    ... Hydroelectric Company, LLC; Notice Soliciting Scoping Comments June 15, 2010 Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of.... Applicant: Wilkesboro Hydroelectric Company, LLC. e. Name of Project: W. Kerr Scott Hydropower Project. f...

  14. Work Scope for Developing Standards for Emergency Preparedness and Response: Fiscal Year 2004 Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Stenner, Robert D.

    2005-09-28

    Summarizes the fiscal year 2004 work completed on PNNL's Department of Homeland Security Emergency Preparedness and Response Standards Development Project. Also, the report includes key draft standards, in various stages of development and publication, that were associated with various tasks of the fiscal year 2004 scope of the project.

  15. Scoping Review of the Zika Virus Literature.

    Directory of Open Access Journals (Sweden)

    Lisa A Waddell

    Full Text Available The global primary literature on Zika virus (ZIKV (n = 233 studies and reports, up to March 1, 2016 has been compiled using a scoping review methodology to systematically identify and characterise the literature underpinning this broad topic using methods that are documented, updateable and reproducible. Our results indicate that more than half the primary literature on ZIKV has been published since 2011. The articles mainly covered three topic categories: epidemiology of ZIKV (surveillance and outbreak investigations 56.6% (132/233, pathogenesis of ZIKV (case symptoms/ outcomes and diagnosis 38.2% (89/233 and ZIKV studies (molecular characterisation and in vitro evaluation of the virus 18.5% (43/233. There has been little reported in the primary literature on ZIKV vectors (12/233, surveillance for ZIKV (13/233, diagnostic tests (12/233 and transmission (10/233. Three papers reported on ZIKV prevention/control strategies, one investigated knowledge and attitudes of health professionals and two vector mapping studies were reported. The majority of studies used observational study designs, 89.7% (209/233, of which 62/233 were case studies or case series, while fewer (24/233 used experimental study designs. Several knowledge gaps were identified by this review with respect to ZIKV epidemiology, the importance of potential non-human primates and other hosts in the transmission cycle, the burden of disease in humans, and complications related to human infection with ZIKV. Historically there has been little research on ZIKV; however, given its current spread through Australasia and the Americas, research resources are now being allocated to close many of the knowledge gaps identified in this scoping review. Future updates of this project will probably demonstrate enhanced evidence and understanding of ZIKV and its impact on public health.

  16. Scoping Review of the Zika Virus Literature

    Science.gov (United States)

    2016-01-01

    The global primary literature on Zika virus (ZIKV) (n = 233 studies and reports, up to March 1, 2016) has been compiled using a scoping review methodology to systematically identify and characterise the literature underpinning this broad topic using methods that are documented, updateable and reproducible. Our results indicate that more than half the primary literature on ZIKV has been published since 2011. The articles mainly covered three topic categories: epidemiology of ZIKV (surveillance and outbreak investigations) 56.6% (132/233), pathogenesis of ZIKV (case symptoms/ outcomes and diagnosis) 38.2% (89/233) and ZIKV studies (molecular characterisation and in vitro evaluation of the virus) 18.5% (43/233). There has been little reported in the primary literature on ZIKV vectors (12/233), surveillance for ZIKV (13/233), diagnostic tests (12/233) and transmission (10/233). Three papers reported on ZIKV prevention/control strategies, one investigated knowledge and attitudes of health professionals and two vector mapping studies were reported. The majority of studies used observational study designs, 89.7% (209/233), of which 62/233 were case studies or case series, while fewer (24/233) used experimental study designs. Several knowledge gaps were identified by this review with respect to ZIKV epidemiology, the importance of potential non-human primates and other hosts in the transmission cycle, the burden of disease in humans, and complications related to human infection with ZIKV. Historically there has been little research on ZIKV; however, given its current spread through Australasia and the Americas, research resources are now being allocated to close many of the knowledge gaps identified in this scoping review. Future updates of this project will probably demonstrate enhanced evidence and understanding of ZIKV and its impact on public health. PMID:27244249

  17. How embedded is public involvement in mainstream health research in England a decade after policy implementation? A realist evaluation.

    Science.gov (United States)

    Wilson, Patricia; Mathie, Elspeth; Poland, Fiona; Keenan, Julia; Howe, Amanda; Munday, Diane; Kendall, Sally; Cowe, Marion; Staniszewska, Sophie; Goodman, Claire

    2018-04-01

    Objectives To explore how embedded patient and public involvement is within mainstream health research following two decades of policy-driven work to underpin health research with patient and public involvement in England. Methods Realist evaluation using Normalization Process Theory as a programme theory to understand what enabled patient and public involvement to be embedded as normal practice. Data were collected through a national scoping and survey, and qualitative methods to track patient and public involvement processes and impact over time within 22 nationally funded research projects. Results In research studies that were able to create reciprocal working relationships and to embed patient and public involvement this was contingent on: the purpose of patient and public involvement being clear; public contributors reflecting research end-beneficiaries; researchers understanding the value of patient and public involvement; patient and public involvement opportunities being provided throughout the research and ongoing evaluation of patient and public involvement. Key contested areas included: whether to measure patient and public involvement impact; seeking public contributors to maintain a balance between being research-aware and an outsider standpoint seen as 'authentically' lay; scaling-up patient and public involvement embedded within a research infrastructure rather than risk token presence and whether patient and public involvement can have a place within basic science. Conclusions While patient and public involvement can be well-integrated within all types of research, policy makers should take account of tensions that must be navigated in balancing moral and methodological imperatives.

  18. NPP Krsko full scope simulator verification and qualification

    International Nuclear Information System (INIS)

    Krajnc, B.; Glaser, B.; Novsak, M.; Spiler, J.

    1998-01-01

    NPP Krsko (NEK) will, as a part of the Modernization plan, obtain also Krsko Full Scope Simulator (KFSS). Contract has been awarded to CAE Electronics for the design, construction and integration. KFSS will support in real time, the training for the complete range of operation, which can be performed from the main control room and some selected plant areas (remote shutdown panels, etc). Based on the lessons learned on development of NPP Krsko Basic Principle Simulator we decided for active approach. That means that NPP Krsko personnel will be heavily involved into all phases of KFSS development and testing. Since NPP Krsko is going to replace the existing steam generators, raise the nominal power and perform necessary modifications to support the power uprate, it was decided that the development of the KFSS will be conducted in two steps: 1. Development of the models as well as all the hardware interface in the MCR for the existing plant Cycle 15 and then, 2. Models and hardware will be modified, added or replaced as needed to take into account the steam generator replacement and plant uprate projects. In spite of the fact that the simulator will be used for the training of the plant operators for the uprated conditions and with new steam generators, the upper described approach was selected since we want to be sure that the models will at the beginning adequately simulate the existing plant. For the existing conditions we have available reference data for different plant conditions, as well as data for different plant transients. By verifying that simulator will be able adequately simulate the existing conditions the level of confidence for the uprated simulator will be much higher. This is of special importance since it will support initial training for modernized plant conditions. In this paper the plan for verification and qualification of KFSS as well as the amount of the work needed on NPP Krsko side to develop the test acceptance criteria will be presented.(author)

  19. Analysis of interactions among barriers in project risk management

    Science.gov (United States)

    Dandage, Rahul V.; Mantha, Shankar S.; Rane, Santosh B.; Bhoola, Vanita

    2018-03-01

    In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success of project management is oftentimes based on the understanding of barriers to effective risk management, application of appropriate risk management methodology, proactive leadership to avoid barriers, workers' attitude, adequate resources, organizational culture, and involvement of top management. This paper represents various risk categories and barriers to risk management in domestic and international projects through literature survey and feedback from project professionals. After analysing the various modelling methods used in project risk management literature, interpretive structural modelling (ISM) and MICMAC analysis have been used to analyse interactions among the barriers and prioritize them. The analysis indicates that lack of top management support, lack of formal training, and lack of addressing cultural differences are the high priority barriers, among many others.

  20. Project Design Concept for Monitoring and Control System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations

  1. Tank waste remediation system privatization Phase 1 infrastructure, project W-519, project execution plan

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented

  2. Project quality assurance plant: Sodium storage facility, project F-031

    International Nuclear Information System (INIS)

    Shultz, J.W.; Shank, D.R.

    1994-11-01

    The Sodium Storage Facility Project Quality Assurance Plan delineates the quality assurance requirements for construction of a new facility, modifications to the sodium storage tanks, and tie-ins to the FFTF Plant. This plan provides direction for the types of verifications necessary to satisfy the functional requirements within the project scope and applicable regulatory requirements determined in the Project Functional Design Criteria (FDC), WHC-SD-FF-FDC-009

  3. Quantifying and managing Scope 3 (Travel) carbon emissions in a UK university

    OpenAIRE

    Chelliah, JR

    2016-01-01

    Purpose:\\ud The Higher Education Statistics Agency requires Higher Education Institutes to reporting their Scope 3 (Travel) carbon emissions effective from January 2015 to show leadership in carbon reporting perspectives. This research contribution is to new knowledge and management processes involves the designing and implementing a hybrid environmental management system(EMS) for Scope 3 (Travel) carbon emissions accountability, developing new quantification tools and reporting by adopting G...

  4. Integrating the GalileoScope into Successful Outreach Programming

    Science.gov (United States)

    Michaud, Peter D.; Slater, S.; Goldstein, J.; Harvey, J.; Garcia, A.

    2010-01-01

    Since 2004, the Gemini Observatory’s week-long Journey Through the Universe (JTtU) program has successfully shared the excitement of scientific research with teachers, students and the public on Hawaii’s Big Island. Based on the national JTtU program started in 1999, the Hawai‘i version reaches an average of 7,000 students annually and each year features a different theme shared with a diverse set of learners. In 2010, the theme includes the integration of the GalileoScope-produced as a keystone project for the International Year of Astronomy. In preparation, a pilot teacher workshop (held in October 2009) introduced local island teachers to the GalileoScope and a 128-page educator’s activity resource book coordinated by the University of Wyoming. Response from this initial teacher’s workshop has been strong and evaluations plus follow-up actions by participating teachers illustrate that the integration of the GalileoScope has been successful based upon this diverse sample. Integrating GalileoScopes into Chilean schools in 2010 is also underway at Gemini South. This program will solicit informal proposals from educators who wish to use the telescopes in classrooms and a Spanish version of the teacher resource book is planned. The authors conclude that integration of the GalileoScope into an existing outreach program is an effective way to keep content fresh, relevant and engaging for both educators and students. This initiative is funded by Gemini Observatory outreach program. The Gemini Observatory is operated by the Association of Universities for Research in Astronomy, Inc., under a cooperative agreement with the NSF on behalf of the Gemini partnership: the National Science Foundation (US), the Science and Technology Facilities Council (UK), the National Research Council (Canada), CONICYT (Chile), the Australian Research Council (Australia), Ministério da Ciência e Tecnologia (Brazil), and Ministerio de Ciencia, Tecnología e Innovación Productiva

  5. Final report Hanford environmental compliance project 89-D-172

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-01-01

    The Hanford Environmental Compliance (HEC) Project is unique in that it consisted of 14 subprojects which varied in project scope and were funded from more that one program. This report describes the HEC Project from inception to completion and the scope, schedule, and cost of the individual subprojects. Also provided are the individual subproject Cost closing statements and Project completion reports accompanied by construction photographs and illustrations

  6. Software engineering beyond the project

    DEFF Research Database (Denmark)

    Dittrich, Yvonne

    2014-01-01

    Context The main part of software engineering methods, tools and technologies has developed around projects as the central organisational form of software development. A project organisation depends on clear bounds regarding scope, participants, development effort and lead-time. What happens when...... of traditional software engineering, but makes perfect sense, considering that the frame of reference for product development is not a project but continuous innovation across the respective ecosystem. The article provides a number of concrete points for further research....

  7. Qinshan 300Mwe NPP full scope simulator upgrade

    International Nuclear Information System (INIS)

    Qi Kelin; Li Qing; Liu Wei, Lai Shengyuan

    2006-01-01

    On April 28,2004, RINPO was awarded the project for Qinshan 300Mwe NPP full scope simulator upgrade, the SAT (site acceptance test) was completed on June 30 2005 and the simulator put into operator training again. Scope of upgrade includes: computer system (DGI server and workstations) all replaced by microcomputers; G2 I/O controllers all replaced by RTP EIOBC; Unix-based simulation support environment replaced by RINPO's PC-based simulation environment RINSIMTM, Instructor software replaced by RINPO's PC-based instructor software with function and diagram redesigned; DEH, Feed-water control and some other digital control systems redeveloped to follow NPP modifications; desk-top simulator with soft panel control room developed as byproduct; most of the models not changed but it is planned the reactor core and PPC model will be upgraded in near future. SAT of upgrade demonstrates that the performance of the simulator much improved after the upgrade. (author)

  8. Parental Involvement and Academic Achievement

    Science.gov (United States)

    Goodwin, Sarah Christine

    2015-01-01

    This research study examined the correlation between student achievement and parent's perceptions of their involvement in their child's schooling. Parent participants completed the Parent Involvement Project Parent Questionnaire. Results slightly indicated parents of students with higher level of achievement perceived less demand or invitations…

  9. The screening and scoping of Environmental Impact Assessment and Strategic Environmental Assessment of Carbon Capture and Storage in the Netherlands

    International Nuclear Information System (INIS)

    Koornneef, Joris; Faaij, Andre; Turkenburg, Wim

    2008-01-01

    The Environmental Impact Assessment (EIA) and Strategic Environmental Assessment (SEA) are procedural tools which have as goal to assess and evaluate possible environmental effects of, respectively, a proposed project or policy plan. The goal of this article is to explore possible bottlenecks in applying both the EIA and SEA procedures on Carbon Capture and Storage (CCS) activities in the Netherlands, as experience is currently minimal or lacking. In this study we focus mainly on the institutional and procedural aspects of the screening and scoping phases of both procedures. This is achieved by reviewing EIA and SEA procedures for analogue projects for the three distinctive process steps of a CCS project, namely the power plant with capture, the transport and finally the underground storage of the CO 2 . Additionally, EIA and SEA or similar procedures on CCS in other countries are reviewed and the legal framework for the Dutch EIA and SEA is studied. This article shows a concise overview of the EIA and SEA procedure in the Netherlands and the relation between both procedures. Based on our findings we have constructed a conceptual taxonomy for the scope of both procedures for CCS in the Netherlands. This taxonomy conceptualizes the possible integration of assessing the environmental impacts for tiered levels of decision making. This integration might be needed for first CCS projects as decisions on the strategic (spatial planning) level are currently absent for CCS in the Netherlands. Perpendicular to such integration is the integration of linked activities in the CCS chain and their alternatives, into one procedure. We argue that it would be beneficial to combine the separate EIA procedures for CCS activities into one procedure or at least provide close linkage between them. This issue should be carefully considered by regulators, competent authorities and project initiators in an early stage to avoid delaying legal procedures in the future. For the same reason

  10. Analyzing the Accuracy of Calculations When Scoping Product Configuration Projects

    DEFF Research Database (Denmark)

    Bonev, Martin; Hvam, Lars

    2012-01-01

    Product configurators have increasingly been applied in industrial environments. With their help, companies providing customized products have managed to redesign their specification processes and to better handle the growing product variety. But despite the promising benefits, conducting...

  11. Market for small waste gasification projects - preliminary scoping study

    International Nuclear Information System (INIS)

    1999-01-01

    This report presents the findings of a market analysis for small waste gasification/pyrolysis plant in the UK. The overall objectives of the study are to assess the potential merits in establishing a demonstration plant in the UK, and to identify the size, profile and characteristics of the potential market based on municipal solid waste (MSW) feedstock. (author)

  12. Scope Management: A Core Information System Implementation Project Pedagogy

    Science.gov (United States)

    Léger, Pierre-Majorique; Lyle, Derick; Babin, Gilbert; Charland, Patrick; Pellerin, Robert

    2013-01-01

    This article describes an initiative to provide IS management a capstone course that builds on the zone of proximal development concept, oriented towards developing prioritization and critical reasoning skills, and to promote self-learning. Request for proposal business cases appear to offer effective mechanisms for retaining context, while…

  13. 42 CFR 456.150 - Scope.

    Science.gov (United States)

    2010-10-01

    ... ASSISTANCE PROGRAMS UTILIZATION CONTROL Utilization Control: Mental Hospitals § 456.150 Scope. This subpart prescribes requirements for control of utilization of inpatient services in mental hospitals, including...

  14. 48 CFR 1804.470-1 - Scope.

    Science.gov (United States)

    2010-10-01

    ... ADMINISTRATIVE MATTERS Safeguarding Classified Information Within Industry 1804.470-1 Scope. This section... administration of hardware, software, firmware, computer systems, networks, and telecommunications systems. [72...

  15. Correlational Study of Risk Management and Information Technology Project Success

    Science.gov (United States)

    Gillespie, Seth J.

    2014-01-01

    Many IT projects fail despite the best efforts to keep these projects within budget, schedule, and scope. Few studies have looked at the effect of project risk management tools and techniques on project success. The primary focus of this study was to examine the extent to which utilization of project risk management processes influence project…

  16. Project Management Methods in Projects Co-financed by EU Funds

    OpenAIRE

    Kostalova, Jana; Tetrevova, Libena; Patak, Michal

    2017-01-01

    This paper deals with the management of projects co-financed by European Union funds (structural funds and the Cohesion Fund) in the Czech Republic (EU projects). The authors aimed to analyze and assess the scope of familiarity with basic project management methods and their application within the implementation of EU projects in the Czech Republic in the Programming Period 2007–2013. Based on a questionnaire survey of EU project organisers, the authors evaluate their attitudes to project man...

  17. Measuring actual scope of nursing practice: a new tool for nurse leaders.

    Science.gov (United States)

    D'Amour, Danielle; Dubois, Carl-Ardy; Déry, Johanne; Clarke, Sean; Tchouaket, Eric; Blais, Régis; Rivard, Michèle

    2012-05-01

    : This project describes the development and testing of the actual scope of nursing practice questionnaire. : Underutilization of the skill sets of registered nurses (RNs) is a widespread concern. Cost-effective, safe, and efficient care requires support by management to facilitate the implementation of nursing practice at the full scope. : Literature review, expert consultation, and face validity testing were used in item development. The instrument was tested with 285 nurses in 22 medical units in 11 hospitals in Canada. : The 26-item, 6-dimension questionnaire demonstrated validity and reliability. The responses suggest that nurses practice at less than their optimal scope, with key dimensions of professional practice being implemented infrequently. : This instrument can help nurse leaders increase the effective use of RN time in carrying out the full scope of their professional practice.

  18. Dosimetric optimization of worksite involving the installation of VATS containing highly active effluent

    International Nuclear Information System (INIS)

    Legee, F.; Busani, J.; Madigand, Y.; Pailloux, J.

    1996-01-01

    Within the framework of safety improvements at the CEA, CEA-FAR, concerned to formalize the ALARA initiative, has carried out for information and training purpose and to create awareness a dosimetric assessment of the worksite where new storage vats for highly active effluents are to be installed. The approach used for this worksite is global. Techniques used were all complementary, ensuring constant elaboration, experiment follow-up and feedback of a worksite at a relatively low dosimetric cost (an estimated 36 men.mSv brought down to 30 men.mSv through implementation of the ALARA principle). This type of global conception of radioprotection involving all the employees (head of project, project managers, companies, radioprotection employees...) which today proves its worth on a modest worksite must now be extended to worksites of a broader scope (several hundreds of men.mSv) where fulfillment of the dosimetric objectives is a major stake. (author)

  19. Effective Strategies for Achieving Scope of Practice Reform in Pennsylvania.

    Science.gov (United States)

    Carthon, J Margo Brooks; Wiltse Nicely, Kelly; Altares Sarik, Danielle; Fairman, Julie

    2016-05-01

    Current regulatory impediments prohibit advanced practice registered nurses from practicing to their full capacity. To examine the process of successful removal of scope of practice barriers in Pennsylvania under the Rx4PA legislation introduced in 2007. We used qualitative research techniques, including purposeful sampling of participants. Twelve stakeholder informed interviews were conducted between October 2013 and May 2014. Participants were closely involved with the development of the Rx4PA legislation. Thematic content analysis was performed to analyze our interviews. Interviews identified overarching themes, including the importance of leveraging years of grass roots advocacy, identifying political allies, and recognizing mutually beneficial compromises. The combination of timing, careful political maneuvering, and compromise were key to scope of practice reform in Pennsylvania and may be useful strategies for other states seeking similar practice changes. © The Author(s) 2016.

  20. Design Theory Projectability

    DEFF Research Database (Denmark)

    Baskerville, Richard; Pries-Heje, Jan

    2014-01-01

    design science research is materially prescriptive, it requires a different perspective in developing the breadth of applications of design theories. In this paper we propose different concepts that embody forms of general technological knowledge The concept of projectability, developed originally......Technological knowledge has been characterized as having a scope that is specific to a particular problem. However, the information systems community is exploring forms of design science research that provide a promising avenue to technological knowledge with broader scope: design theories. Because...... as a means of distinguishing realized generalizations from unrealized generalizations, helps explain how design theories, being prescriptive, possess a different form of applicability. The concept of entrenchment describes the use of a theory in many projections. Together these concepts provide a means...

  1. The virtual GULLIVER project

    NARCIS (Netherlands)

    Trappl, R.; Nijholt, Antinus; Stuk, M.; Zwiers, Jakob

    2002-01-01

    In this paper we discuss our virtual reality project Gulliver. This project is part of a more comprehensive project conceived by two artists, Matjaž Štuk and Alena Hudcovicová, called “Gulliver’s Museum of Living Art��?. Our part of the project involves a virtual reality version of Swift’s Gulliver

  2. Using EarthScope Construction of the Plate Boundary Observatory to Provide Locally Based Experiential Education and Outreach

    Science.gov (United States)

    Jackson, M.; Eriksson, S.; Barbour, K.; Venator, S.; Mencin, D.; Prescott, W.

    2006-12-01

    region to study the area between the San Andreas Fault and the San Jacinto Fault. The event provided an opportunity for the Pathfinder Ranch to unveil the instruments and describe the important science behind the project to the school's students, staff, and board members. The two strainmeters will be used as a teaching tool for several years as hundreds of students filter through Pathfinder school. UNAVCO sponsors a summer PBO Student Field Assistant Program designed to give students from a variety of educational backgrounds the opportunity get involved in the construction of the EarthScope PBO project. The goal of the program is to excite students about the geodetic sciences through direct work experience. Over the summers of 2005 and 2006, PBO sponsored a total of 11 student assistants who helped to install GPS and strainmeter stations and to perform operations and maintenance tasks. PBO plans to expand this program in 2007 by including student assistants in our data management and strainmeter data processing activities. In August, 2006, UNAVCO led a group of scientists, teachers, and curriculum developers to identify key scientific concepts of EarthScope research and how they can be translated into the Earth Science classroom at the middle and high school levels. The focus was on the Cascadia region. A feature of the workshop was to use PBO and USArray data in the classroom.

  3. 21 CFR 1311.01 - Scope.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Scope. 1311.01 Section 1311.01 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE REQUIREMENTS FOR ELECTRONIC ORDERS AND PRESCRIPTIONS (Eff. 6.... For the convenience of the user, the revised text is set forth as follows: § 1311.01 Scope. This part...

  4. 12 CFR 7.5000 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Scope. 7.5000 Section 7.5000 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY BANK ACTIVITIES AND OPERATIONS Electronic Activities § 7.5000 Scope. This subpart applies to a national bank's use of technology to deliver services and...

  5. 12 CFR 308.600 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Scope. 308.600 Section 308.600 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION PROCEDURE AND RULES OF PRACTICE RULES OF PRACTICE AND PROCEDURE Removal, Suspension, and Debarment of Accountants From Performing Audit Services § 308.600 Scope...

  6. 12 CFR 19.241 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Scope. 19.241 Section 19.241 Banks and Banking..., and Debarment of Accountants From Performing Audit Services § 19.241 Scope. This subpart, which... their accounting firms from performing independent audit and attestation services required by section 36...

  7. 17 CFR 39.1 - Scope.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Scope. 39.1 Section 39.1 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION DERIVATIVES CLEARING ORGANIZATIONS § 39.1 Scope. The provisions of this part apply to any derivatives clearing organization as defined...

  8. 21 CFR 328.1 - Scope.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 5 2010-04-01 2010-04-01 false Scope. 328.1 Section 328.1 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS FOR HUMAN USE OVER-THE-COUNTER DRUG PRODUCTS INTENDED FOR ORAL INGESTION THAT CONTAIN ALCOHOL General Provisions § 328.1 Scope...

  9. 40 CFR 725.1000 - Scope.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 30 2010-07-01 2010-07-01 false Scope. 725.1000 Section 725.1000 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT REPORTING....1000 Scope. This subpart identifies uses of microorganisms which EPA has determined to be significant...

  10. 21 CFR 99.1 - Scope.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Scope. 99.1 Section 99.1 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL DISSEMINATION OF INFORMATION ON UNAPPROVED/NEW USES FOR MARKETED DRUGS, BIOLOGICS, AND DEVICES General Information § 99.1 Scope. (a) This...

  11. 77 FR 9893 - Notice of Scope Rulings

    Science.gov (United States)

    2012-02-21

    ... feedstock exported from the PRC to Mexico and then processed into granular magnesium before exportation to... exported from Japan is within the scope of the antidumping duty and countervailing duty orders; requested... electric blanket is not within the scope of the antidumping duty order; April 14, 2011. Japan A-588-804...

  12. 22 CFR 309.2 - Scope.

    Science.gov (United States)

    2010-04-01

    ... thereof, or any public international organization. (2) Debts arising out of acquisitions contracts subject... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Scope. 309.2 Section 309.2 Foreign Relations PEACE CORPS DEBT COLLECTION General Provisions § 309.2 Scope. (a) Applicability of Federal Claims...

  13. 22 CFR 34.2 - Scope.

    Science.gov (United States)

    2010-04-01

    ... Federal agency, any foreign country or any political subdivision thereof, or any public international... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Scope. 34.2 Section 34.2 Foreign Relations DEPARTMENT OF STATE CLAIMS AND STOLEN PROPERTY DEBT COLLECTION General Provisions § 34.2 Scope. (a) Except as...

  14. 12 CFR 334.40 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Scope. 334.40 Section 334.40 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND STATEMENTS OF GENERAL POLICY FAIR CREDIT REPORTING Duties of Furnishers of Information § 334.40 Scope. This subpart applies to a financial institution or...

  15. 41 CFR 128-1.8000 - Scope.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Scope. 128-1.8000 Section 128-1.8000 Public Contracts and Property Management Federal Property Management Regulations System (Continued) DEPARTMENT OF JUSTICE 1-INTRODUCTION 1.80-Seismic Safety Program § 128-1.8000 Scope. This subpart...

  16. 21 CFR 54.3 - Scope.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Scope. 54.3 Section 54.3 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL FINANCIAL DISCLOSURE BY CLINICAL INVESTIGATORS § 54.3 Scope. The requirements in this part apply to any applicant who submits a marketing...

  17. On the optimal scope of negligence

    NARCIS (Netherlands)

    Dari-Mattiacci, G.

    2005-01-01

    This article studies the optimal scope of negligence, considering which of the parties’ precautionary measures should be included in the determination of negligence and which instead should be omitted. The analysis shows that the optimal scope of negligence balances the gains derived from improved

  18. 47 CFR 1.1601 - Scope.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Scope. 1.1601 Section 1.1601 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE Random Selection Procedures for Mass Media Services General Procedures § 1.1601 Scope. The provisions of this subpart, and the provisions...

  19. 6 CFR 7.2 - Scope.

    Science.gov (United States)

    2010-01-01

    ..., National Industrial Security Program, and its implementing directives. (c) This part is independent of and... 6 Domestic Security 1 2010-01-01 2010-01-01 false Scope. 7.2 Section 7.2 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CLASSIFIED NATIONAL SECURITY INFORMATION § 7.2 Scope...

  20. 15 CFR 762.1 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Scope. 762.1 Section 762.1 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE EXPORT ADMINISTRATION REGULATIONS RECORDKEEPING § 762.1 Scope. In...

  1. 49 CFR 195.48 - Scope.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Scope. 195.48 Section 195.48 Transportation Other... Annual, Accident, and Safety-Related Condition Reporting § 195.48 Scope. This subpart prescribes... 7000-1.1) required by § 195.49 or to provide the estimate of total miles that could affect high...

  2. 10 CFR 63.141 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Scope. 63.141 Section 63.141 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Quality Assurance § 63.141 Scope. As used in this part, quality assurance comprises all those...

  3. 10 CFR 72.2 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Scope. 72.2 Section 72.2 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General Provisions § 72.2 Scope. (a) Except...

  4. 10 CFR 60.150 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Scope. 60.150 Section 60.150 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Quality Assurance § 60.150 Scope. As used in this part, quality assurance comprises all those planned and systematic...

  5. 33 CFR 64.03 - Scope.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Scope. 64.03 Section 64.03... STRUCTURES, SUNKEN VESSELS AND OTHER OBSTRUCTIONS General § 64.03 Scope. (a) Except as provided in paragraph... jurisdiction of the United States and, on the high seas, structures owned or operated by persons subject to the...

  6. 10 CFR 434.101 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Scope. 434.101 Section 434.101 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY CODE FOR NEW FEDERAL COMMERCIAL AND MULTI-FAMILY HIGH RISE RESIDENTIAL BUILDINGS Administration and Enforcement-General § 434.101 Scope. 101.1 This part provides design...

  7. 30 CFR 75.823 - Scope.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Scope. 75.823 Section 75.823 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Underground High-Voltage Distribution High-Voltage Longwalls § 75.823 Scope...

  8. 19 CFR 101.0 - Scope.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Scope. 101.0 Section 101.0 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY GENERAL PROVISIONS § 101.0 Scope. This part sets forth general regulations governing the authority of Customs...

  9. 19 CFR 173.0 - Scope.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 2 2010-04-01 2010-04-01 false Scope. 173.0 Section 173.0 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY (CONTINUED) ADMINISTRATIVE REVIEW IN GENERAL § 173.0 Scope. This part deals with the general authority of review, the...

  10. 47 CFR 22.801 - Scope.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Scope. 22.801 Section 22.801 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PUBLIC MOBILE SERVICES Air-Ground Radiotelephone Service § 22.801 Scope. The rules in this subpart govern the licensing and operation of air-ground...

  11. 33 CFR 25.801 - Scope.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Scope. 25.801 Section 25.801 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY GENERAL CLAIMS Pollution Removal Damage Claims § 25.801 Scope. This subpart prescribes the requirements for the administrative settlement...

  12. 47 CFR 27.801 - Scope.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Scope. 27.801 Section 27.801 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES MISCELLANEOUS WIRELESS COMMUNICATIONS SERVICES 1.4 GHz Band § 27.801 Scope. This subpart sets out the regulations governing service in...

  13. 5 CFR 2634.801 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Scope. 2634.801 Section 2634.801 Administrative Personnel OFFICE OF GOVERNMENT ETHICS GOVERNMENT ETHICS EXECUTIVE BRANCH FINANCIAL DISCLOSURE, QUALIFIED TRUSTS, AND CERTIFICATES OF DIVESTITURE Ethics Agreements § 2634.801 Scope. This subpart applies...

  14. 30 CFR 906.1 - Scope.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Scope. 906.1 Section 906.1 Mineral Resources... OF SURFACE MINING OPERATIONS WITHIN EACH STATE COLORADO § 906.1 Scope. This part contains all rules applicable only within Colorado that have been adopted under the Surface Mining Control and Reclamation Act...

  15. NEGATIVE AFFECTIVITY, CONSCIENTIOUSNESS AND JOB SCOPE (A CASE OF IT AND TELECOM INDUSTRY

    Directory of Open Access Journals (Sweden)

    BILAL AFSAR

    2010-01-01

    Full Text Available Based on a sample of 350 employees in the telecommunication and telecommunication, we obtained empirical evidence suggesting that while individuals high on conscientiousness tended to react more positively to job scope, individuals high on negative affinity tended to react less positively. Job scope was defined as the extent to which a job required the jobholder to be mentally and physically involved to get it done effectively. Typically, a job characterized by a high job scope would be non-repetitive, would need a great deal of independent thought/action and training, would entail the job holder to keep track of his/her progress, and others. The affirmative results obtained in regard of the moderating roles of personality factors in the present study suggested that job design researchers should further explore individuals’ personality differences in response to job scope.

  16. Paternal Involvement in Child- Rearing Activities: The Perspective of ...

    African Journals Online (AJOL)

    In recognition of the need to widen the scope of fatherhood scholarship, this article centered on examining paternal involvement but in a socio- cultural context and developmental stage that has headed little attention in previous research. An attempt was made to investigate the nature of paternal involvement (ways, desires ...

  17. Full-scope nuclear training simulator -brought to the desktop

    International Nuclear Information System (INIS)

    LaPointe, D.J.; Manz, A.; Hall, G.S.

    1997-01-01

    RighTSTEP is a suite of simulation software which has been initially designed to facilitate upgrade of Ontario Hydro's full-scope simulators, but is also adaptable to a variety of other roles. it is presently being commissioned at Bruch A Training Simulator and has seen preliminary use in desktop and classroom roles. Because of the flexibility of the system, we anticipate it will see common use in the corporation for full-scope simulation roles. A key reason for developing RighTSTEP (Real Time Simulator Technology Extensible and Portable) was the need to modernize and upgrade the full-scope training simulator while protecting the investment in modelling code. This modelling code represents the end product of 18 years of evolution from the beginning of its development in 1979. Bringing this modelling code to a modern and more useful framework - the combination of simulator host, operating system, and simulator operating system - also could provide many spin-off benefits. The development (and first implementation) of the righTSTEP system was cited for saving the corporation 5.6M$ and was recognized by a corporate New Technology Award last year. The most important spin-off from this project has been the desktop version of the full-scope simulator. The desktop simulator uses essentially the same software as does its full-scope counterpart, and may be used for a variety of new purposes. Classroom and individual simulator training can now be easily accommodated since a desktop simulator is both affordable and relatively ease to use. Further, a wide group of people can be trained using the desktop simulator: by contrast the full-scope simulators were almost exclusively devoted to front-line operating staff. The desktop is finding increasing use in support of engineering applications, resulting from its easy accessibility, breadth of station systems represented, and tools for analysis and viewing. As further plant models are made available on the new simulator platform and

  18. The Role of the Project Management Office on Information Technology Project Success

    Science.gov (United States)

    Stewart, Jacob S.

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. Assessing critical success factors is another…

  19. The Production and Dissemination of Knowledge: A Scoping Review of Arts-Based Health Research

    Directory of Open Access Journals (Sweden)

    Katherine M. Boydell

    2012-01-01

    Full Text Available The use of arts-based research is shifting our understanding of what counts as evidence and highlights the complexity and multidimensionality involved in creating new knowledge. A scoping review of arts-based health research was undertaken to identify the breadth of peer-reviewed literature, summarize findings and identify gaps. A literature database search identified 71 original studies meeting our criteria for review. Studies were characterized by diverse art genres, designs, and substantive health topics. The arts in qualitative research were considered an opportunity for enhanced engagement of participants and audiences alike, a way to enrich communication and make research accessible beyond academia, and a method for generating data beyond the scope of most interview-based methods. Three central gaps were identified: the need for critical dialogue regarding the impact of arts-based health research, the need to focus on how the quality of such projects is judged, and the need to address the ethical challenges of engaging in this work. We suggest that the broadening of qualitative methodologies to include arts-based approaches offers more than simply adjuncts to typical data collection and dissemination approaches, and instead, presents different ways of knowing. We believe that this may be a significant moment in the field in which to question whether or not we are witness to a paradigmatic shift in the ways we approach inquiry into the social world and/or the emergence of an innovative set of techniques that researchers can draw upon to enhance traditional methods of conducting qualitative inquiry. URN: http://nbn-resolving.de/urn:nbn:de:0114-fqs1201327

  20. Managing the first nuclear power plant project

    International Nuclear Information System (INIS)

    2007-05-01

    Energy is essential for national development. Nearly every aspect of development - from reducing poverty and raising living standards to improving health care, industrial and agricultural productivity - requires reliable access to modern energy resources. States may have different reasons for considering starting a nuclear power project to achieve their national energy needs, such as: lack of available indigenous energy resources, the desire to reduce dependence upon imported energy, the need to increase the diversity of energy resources and/or mitigation of carbon emission increases. The start of a nuclear power plant project involves several complex and interrelated activities with long duration. Experience shows that the time between the initial policy decision by a State to consider nuclear power up to the start of operation of its first nuclear power plant is about 10 to 15 years and that before specific project management can proceed, several key infrastructure issues have to be in place. The proper management of the wide scope of activities to be planned and implemented during this period represents a major challenge for the involved governmental, utility, regulatory, supplier and other supportive organizations. The main focus is to ensure that the project is implemented successfully from a commercial point of view while remaining in accordance with the appropriate engineering and quality requirements, safety standards and security guides. This publication is aimed at providing guidance on the practical management of a first nuclear power project in a country. There are many other issues, related to ensuring that the infrastructure in the country has been prepared adequately to ensure that the project will be able to be completed, that are only briefly addressed in this publication. The construction of the first nuclear power plant is a major undertaking for any country developing a nuclear power programme. Worldwide experience gained in the last 50 years

  1. Pre-Project planning of Capital Facilities at NASA

    OpenAIRE

    Barrow, Benjamin John

    1999-01-01

    This thesis details the development of a NASA specific Project Definition Rating Index (PDRI) tool. This tool is to be used as a checklist for determining the necessary steps to follow in defining project scope and as a means to monitor progress and assess scope definition completeness at various stages during the NASA Pre-Project Planning process. This thesis also describes and identifies specific points in the NASA Capital Facility Programming Cycle for the performance of PDRI assessments ...

  2. Training for Quality: Improving Early Childhood Programs through Systematic Inservice Training. Monographs of the High/Scope Educational Research Foundation, Number Nine.

    Science.gov (United States)

    Epstein, Ann S.

    The Training of Trainers (ToT) Evaluation investigated the efficacy of the High/Scope model for improving the quality of early childhood programs on a national scale. To address this question, the High/Scope Foundation undertook a multimethod evaluation that collected anecdotal records from the consultants and 793 participants in 40 ToT projects,…

  3. Project mobilisation

    International Nuclear Information System (INIS)

    Clark, J.; Limbrick, A.

    1996-01-01

    This paper identifies and reviews the issues to be addressed and the procedures to be followed during the mobilisation of projects using LFG as an energy source. Knowledge of the procedures involved in project mobilisation, their sequence and probable timescales, is essential for efficient project management. It is assumed that the majority of projects will be situated on existing, licensed landfill sites and, in addition to complying with the relevant conditions of the waste management licence and original planning consent, any proposed developments on the site will require a separate planning consent. Experience in the UK indicates that obtaining planning permission rarely constitutes a barrier to the development of schemes for the utilisation of LFG. Even so, an appreciation of the applicable environmental and planning legislation is essential as this will enable the developer to recognise the main concerns of the relevant planning authority at an early stage of the project, resulting in the preparation of an informed and well-structured application for planning permission. For a LFG utilisation scheme on an existing landfill site, the need to carry out an environmental assessment (EA) as part of the application for planning permission will, in vitually all cases, be discretionary. Even if not deemed necessary by the planning authority, an EA is a useful tool at the planning application stage, to identify and address potential problems and to support discussions with bodies such as the Environment Agency, from whom consents or authorisations may be required. Carrying out an EA can thus provide for more cost-effective project development and enhanced environmental protection. Typically, the principal contractual arrangements, such as the purchase of gas or the sale of electricity, will have been established before the project mobilisation phase. However, there are many other contractural arrangements that must be established, and consents and permits that may be

  4. RISK MANAGEMENT IN A LARGE-SCALE NEW RAILWAY TRANSPORT SYSTEM PROJECT

    Directory of Open Access Journals (Sweden)

    Sunduck D. SUH, Ph.D., P.E.

    2000-01-01

    Full Text Available Risk management experiences of the Korean Seoul-Pusan high-speed railway (KTX project since the planning stage are evaluated. One can clearly see the interplay of engineering and construction risks, financial risks and political risks in the development of the KTX project, which is the peculiarity of large-scale new railway system projects. A brief description on evaluation methodology and overview of the project is followed by detailed evaluations on key differences in risks between conventional railway system and high-speed railway system, social and political risks, engineering and construction risks, and financial risks. Risks involved in system procurement process, such as proposal solicitation, evaluation, selection, and scope of solicitation are separated out and evaluated in depth. Detailed events resulting from these issues are discussed along with their possible impact on system risk. Lessons learned and further possible refinements are also discussed.

  5. Requirements Analysis Study for Master Pump Shutdown System Project Development Specification

    International Nuclear Information System (INIS)

    BEVINS, R.R.

    2000-01-01

    This study is a requirements document that presents analysis for the functional description for the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment. The requirements in this study apply to the first phase of the W314 Project. This document has been updated during the definitive design portion of the first phase of the W314 Project to capture additional software requirements and is planned to be updated during the second phase of the W314 Project to cover the second phase of the project's scope

  6. The evolution of the Waste Isolation Pilot Plant (WIPP) project's public affairs program

    International Nuclear Information System (INIS)

    Walter, L.H.

    1988-01-01

    As a first-of-a-kind facility, the Waste Isolation Pilot Plant (WIPP) presents a unique perspective on the value of designing a public affairs program that grown with and complements a project's evolution from construction to operations. Like the project itself, the public affairs programs progressed through several stages to its present scope. During the construction phase, foundations were laid in the community. Then, in this past year as the project entered a preoperational status, emphasis shifted to broaden the positive image that had been created locally. In this stage, public affairs presented the project's positive elements to the various state agencies, government officials, and federal organizations involved in our country's radioactive waste management program. Most recently, and continuing until receipt of the first shipment of waste in October 1988, an even broader, more aggressive public affairs program is planned

  7. SDN Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories Inc, Pullman, WA (United States)

    2016-12-23

    The SDN Project completed on time and on budget and successfully accomplished 100% of the scope of work outlined in the original Statement of Project Objective (SOPO). The SDN Project formed an alliance between Ameren Corporation, University of Illinois Urbana- Champaign (UIUC), Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). The objective of the SDN Project is to address Topic Area of Interest 2: Sustain critical energy delivery functions while responding to a cyber-intrusion under Funding Opportunity Announcement DE-FOA-0000797. The goal of the project is to design and commercially release technology that provides a method to sustain critical energy delivery functions during a cyber intrusion and to do this control system operators need the ability to quickly identify and isolate the affected network areas, and re-route critical information and control flows around. The objective of the SDN Project is to develop a Flow Controller that monitors, configures, and maintains the safe, reliable network traffic flows of all the local area networks (LANs) on a control system in the Energy sector. The SDN team identified the core attributes of a control system and produced an SDN flow controller that has the same core attributes enabling networks to be designed, configured and deployed that maximize the whitelisted, deny-bydefault and purpose built networks. This project researched, developed and commercially released technology that: Enables all field networks be to configured and monitored as if they are a single asset to be protected; Enables greatly improved and even precalculated response actions to reliability and cyber events; Supports pre-configured localized response actions tailored to provide resilience against failures and centralized response to cyber-attacks that improve network reliability and availability; Architecturally enables the right subject matter experts, who are usually the information

  8. Project Finance: Basic Components

    OpenAIRE

    Alfieri Li Ojeda, Jaime

    2015-01-01

    The natural speed of the contemporary world demands large investment projects which require specialized financial techniques such as Project Finance, defined as a fund to finance investment projects of great magnitude. Every Project Finance involves a wide range of elements such as promoters, government, contractors andsuppliers, among others, that will ensure project success. La rapidez del mundo contemporáneo exige que los grandes proyectos de inversión requieran de técnicas financieras ...

  9. 40 CFR 262.103 - What is the scope of the laboratory environmental management standard?

    Science.gov (United States)

    2010-07-01

    ... environmental management standard? 262.103 Section 262.103 Protection of Environment ENVIRONMENTAL PROTECTION... University Laboratories XL Project-Laboratory Environmental Management Standard § 262.103 What is the scope of the laboratory environmental management standard? The Laboratory Environmental Management Standard...

  10. Extending the scope of neuropeptidomics in the mammalian brain

    Directory of Open Access Journals (Sweden)

    Xiaozhe Zhang

    2014-06-01

    Full Text Available Neuropeptides are signaling molecules of intermediate size that are involved in neurotransmission and endocrine regulation. Complete monitoring of neuropeptides using neuropeptidomics approaches remains an important goal for describing targeted physiological regulation pathways. Considerable effort has been expended, particularly in terms of technique and methodology development, to extend the scope of neuropeptidomics. The capability of peptide characterization has been gradually improved, thus responding to increasing demands for broad detection and determination of various peptides. In this review, we discuss some achievements for the improvement of peptide identification coverage and their application for brain diseases and studying consequences of drug applications.

  11. Business Intelligence Support For Project Management

    OpenAIRE

    Muntean, Mihaela; Cabau, Liviu Gabiel

    2013-01-01

    With respect to the project management framework, a project live cycle consists of phases like: initiation, planning, execution, monitoring & control and closing. Monitoring implies measuring the progress and performance of the project during its execution and communicating the status. Actual performance is compared with the planned one. Therefore, a minimal set of key performance indicators will be proposed. Monitoring the schedule progress, the project budget and the scope will be possible....

  12. Underestimation of Project Costs

    Science.gov (United States)

    Jones, Harry W.

    2015-01-01

    Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

  13. A scoping review of cloud computing in healthcare.

    Science.gov (United States)

    Griebel, Lena; Prokosch, Hans-Ulrich; Köpcke, Felix; Toddenroth, Dennis; Christoph, Jan; Leb, Ines; Engel, Igor; Sedlmayr, Martin

    2015-03-19

    Cloud computing is a recent and fast growing area of development in healthcare. Ubiquitous, on-demand access to virtually endless resources in combination with a pay-per-use model allow for new ways of developing, delivering and using services. Cloud computing is often used in an "OMICS-context", e.g. for computing in genomics, proteomics and molecular medicine, while other field of application still seem to be underrepresented. Thus, the objective of this scoping review was to identify the current state and hot topics in research on cloud computing in healthcare beyond this traditional domain. MEDLINE was searched in July 2013 and in December 2014 for publications containing the terms "cloud computing" and "cloud-based". Each journal and conference article was categorized and summarized independently by two researchers who consolidated their findings. 102 publications have been analyzed and 6 main topics have been found: telemedicine/teleconsultation, medical imaging, public health and patient self-management, hospital management and information systems, therapy, and secondary use of data. Commonly used features are broad network access for sharing and accessing data and rapid elasticity to dynamically adapt to computing demands. Eight articles favor the pay-for-use characteristics of cloud-based services avoiding upfront investments. Nevertheless, while 22 articles present very general potentials of cloud computing in the medical domain and 66 articles describe conceptual or prototypic projects, only 14 articles report from successful implementations. Further, in many articles cloud computing is seen as an analogy to internet-/web-based data sharing and the characteristics of the particular cloud computing approach are unfortunately not really illustrated. Even though cloud computing in healthcare is of growing interest only few successful implementations yet exist and many papers just use the term "cloud" synonymously for "using virtual machines" or "web

  14. 7 CFR 610.2 - Scope.

    Science.gov (United States)

    2010-01-01

    ... conservation activities and programs. NRCS works with individuals, groups, and units of government to help them... the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation Operations § 610.2 Scope. (a...

  15. 22 CFR 18.1 - Scope.

    Science.gov (United States)

    2010-04-01

    ... § 18.1 Scope. This part contains rules governing disciplinary action against a former officer or... employment conflict of interest prohibitions. Such disciplinary action may include prohibition from practice...

  16. 75 FR 14138 - Notice of Scope Rulings

    Science.gov (United States)

    2010-03-24

    ... the People's Republic of China Requestor: Tubos California; steel pipes used in water delivery systems, water and sewer purification systems and/or water filtration systems are within the scope of the...

  17. 48 CFR 237.7100 - Scope.

    Science.gov (United States)

    2010-10-01

    ... DEFENSE SPECIAL CATEGORIES OF CONTRACTING SERVICE CONTRACTING Laundry and Dry Cleaning Services 237.7100 Scope. This subpart— (a) Applies to contracts for laundry and dry cleaning services within the United...

  18. Scope of nanotechnology in modern textiles

    Science.gov (United States)

    This review article demonstrates the scope and applications of nanotechnology towards modification and development of advanced textile fibers, yarns and fabrics and their processing techniques. Basically, it summarizes the recent advances made in nanotechnology and its applications to cotton textil...

  19. 46 CFR 164.019-1 - Scope.

    Science.gov (United States)

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Personal Flotation Device Components § 164.019-1 Scope. (a) This subpart contains general requirements for standard personal flotation device (PFD) components, procedures for acceptance of...

  20. 48 CFR 22.1500 - Scope.

    Science.gov (United States)

    2010-10-01

    ... APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Prohibition of Acquisition of Products Produced by Forced or Indentured Child Labor 22.1500 Scope. This subpart applies to acquisitions of supplies that exceed...

  1. 10 CFR 431.291 - Scope.

    Science.gov (United States)

    2010-01-01

    ... Refrigerated Bottled or Canned Beverage Vending Machines § 431.291 Scope. This subpart specifies test procedures for certain commercial refrigerated bottled or canned beverage vending machines, pursuant to part...

  2. 24 CFR 203.259a - Scope.

    Science.gov (United States)

    2010-04-01

    ... MORTGAGE AND LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES SINGLE FAMILY MORTGAGE INSURANCE Contract Rights and Obligations Mortgage Insurance Premiums-in General § 203.259a Scope... Insurance Premiums—Periodic Payment ...

  3. IMPLEMENTATION OF WORK LIFE QUALITY PROGRAMS WITH THE PROJECT MANAGEMENT MODEL

    Directory of Open Access Journals (Sweden)

    Maria Lúcia Granja Coutinho

    2010-06-01

    Full Text Available The research studies the implementation of Quality of Working Life (QWL programs using project management techniques. Quality of Work Life projects have undergone a constant increase in scope to the point where they currently involve such diverse themes as change in dietary habits, exercise, stress management, socio environmental responsibility, and adult education. The major focus of this research is to analyze the processes and knowledge areas of project management being used to deal with this increased scope. The managerial processes identified were divided into categories of preparation, structuring, execution, and conclusion. The knowledge areas studied were: communication, risks, human resources, and acquisitions. The firms studied included mid to large sized firms located in the north, southeast and south of Brazil. We interviewed managers, directors, CEOs, plant managers, and line managers as part of this effort. The results suggest that the project management practices used were ad hoc and based on day to day needs. They also suggest that sound project management practices are applicable to QWL programs in the firms we studied.

  4. Quality Management in Project Management Consulting. A Case Study in an International Consulting Company

    Directory of Open Access Journals (Sweden)

    Eduard-Gabriel Ceptureanu

    2017-02-01

    Full Text Available The present paper addresses quality management from the specific perspective of project management consulting service providers, in the framework of large infrastructure projects. Because of their supposed superiority in knowledge and experience, project management consultants have an ultimate responsibility for the proper implementing of the project. Therefore, quality management in consulting organizations should focus on critical success factors. As there is no consensus yet regarding the most important aspects of the consulting activity on which depend the achievement of the project aims, there is scope for further investigating this subject. Here, the case of a project management consulting organization involved in large infrastructure projects in Romania, Bulgaria, Moldova, Ukraine and Serbia is analyzed. Data collected through a questionnaire-based survey among international consultants and support personnel suggest that factors related to leadership style and communication skills are more closely tied to the success of the project than more technical aspects. The results constitute an empirical evidence of main success factors for specialized consulting services in project management and can be useful in improving business and project performance and achieving business excellence.

  5. Factors influencing cost over-run in Indian construction projects

    Directory of Open Access Journals (Sweden)

    Cindrela Devi A.

    2017-01-01

    Full Text Available Construction cost is the most important criteria of project success and hence the construction project performance is generally expressed in terms of cost and its variance from the budget. In spite of having extant literature, cost estimation methods, cost indices etc., construction projects rarely meet the budgeted cost. This research study focuses on the construction cost overrun and to identify the various factors that affects the construction cost performance. Based on an extensive literature review and input from industry experts, sixty eight factors that causes cost overrun were identified for investigation. Further, a structured questionnaire survey was conducted among the industry experts and the collected data has been analysed statistically. It is concluded that the factors namely scope creep, construction delays, rework and practise of awarding the contract to the lowest bidder are most significant factors for construction cost overrun in non-infrastructural Indian projects. The relative importance of the listed factors used to guide the project team in addressing the cost related risks involved in the projects. The findings are expected to bridge the gap in the current construction cost management practices.

  6. Scoping Study Investigating PWR Instrumentation during a Severe Accident Scenario

    Energy Technology Data Exchange (ETDEWEB)

    Rempe, J. L. [Rempe and Associates, LLC, Idaho Falls, ID (United States); Knudson, D. L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Lutz, R. J. [Lutz Nuclear Safety Consultant, LLC, Asheville, NC (United States)

    2015-09-01

    The accidents at the Three Mile Island Unit 2 (TMI-2) and Fukushima Daiichi Units 1, 2, and 3 nuclear power plants demonstrate the critical importance of accurate, relevant, and timely information on the status of reactor systems during a severe accident. These events also highlight the critical importance of understanding and focusing on the key elements of system status information in an environment where operators may be overwhelmed with superfluous and sometimes conflicting data. While progress in these areas has been made since TMI-2, the events at Fukushima suggests that there may still be a potential need to ensure that critical plant information is available to plant operators. Recognizing the significant technical and economic challenges associated with plant modifications, it is important to focus on instrumentation that can address these information critical needs. As part of a program initiated by the Department of Energy, Office of Nuclear Energy (DOE-NE), a scoping effort was initiated to assess critical information needs identified for severe accident management and mitigation in commercial Light Water Reactors (LWRs), to quantify the environment instruments monitoring this data would have to survive, and to identify gaps where predicted environments exceed instrumentation qualification envelop (QE) limits. Results from the Pressurized Water Reactor (PWR) scoping evaluations are documented in this report. The PWR evaluations were limited in this scoping evaluation to quantifying the environmental conditions for an unmitigated Short-Term Station BlackOut (STSBO) sequence in one unit at the Surry nuclear power station. Results were obtained using the MELCOR models developed for the US Nuclear Regulatory Commission (NRC)-sponsored State of the Art Consequence Assessment (SOARCA) program project. Results from this scoping evaluation indicate that some instrumentation identified to provide critical information would be exposed to conditions that

  7. ORGANIZATION OF FUTURE ENGINEERS' PROJECT-BASED LEARNING WHEN STUDYING THE PROJECT MANAGEMENT METHODOLOGY

    Directory of Open Access Journals (Sweden)

    Halyna V. Lutsenko

    2015-02-01

    Full Text Available The peculiarities of modern world experience of implementation of project-based learning in engineering education have been considered. The potential role and place of projects in learning activity have been analyzed. The methodology of organization of project-based activity of engineering students when studying the project management methodology and computer systems of project management has been proposed. The requirements to documentation and actual results of students' projects have been described in detail. The requirements to computer-aided systems of project management developed by using Microsoft Project in the scope of diary scheduling and resources planning have been formulated.

  8. Patient involvement in hospital architecture

    DEFF Research Database (Denmark)

    Herriott, Richard

    2017-01-01

    the structure of the design process, identification and ranking of stakeholders, the methods of user-involvement and approaches to accessibility. The paper makes recommendations for a change of approach to user-participation in large-scale, long-duration projects. The paper adds new insight on an under...

  9. Britain's delegation to CERN, the European Centre for Nuclear Research near Geneva, voted in favour of a project which take seven years to build, involve a 27 kilometre long tunnel, and cost 230 million pounds. Now LEP receives the go-ahead later this month

    CERN Multimedia

    Llewellyn Smith, Christopher Hubert

    1981-01-01

    Britain's delegation to CERN, the European Centre for Nuclear Research near Geneva, voted in favour of a project which take seven years to build, involve a 27 kilometre long tunnel, and cost 230 million pounds. Now LEP receives the go-ahead later this month

  10. When should virtual cybercrime be brought under the scope of the criminal law?

    NARCIS (Netherlands)

    Strikwerda, Litska; Rogers, Marcus; Seigfried-Spellar, Kathryn C.

    2012-01-01

    This paper is about the question when virtual cybercrime should be brought under the scope of the criminal law. By virtual cybercrime I mean crime that involves a specific aspect of computers or computer networks: virtuality. Examples of virtual cybercrime are: virtual child pornography, theft of

  11. Handwriting Difficulties in Children with Autism Spectrum Disorders: A Scoping Review

    Science.gov (United States)

    Kushki, Azadeh; Chau, Tom; Anagnostou, Evdokia

    2011-01-01

    Functional handwriting involves complex interactions among physical, cognitive and sensory systems. Impairments in many aspects of these systems are associated with Autism spectrum disorders (ASD), suggesting a heightened risk of handwriting difficulties in children with ASD. This scoping review aimed to: (1) survey the existing evidence about…

  12. 29 CFR 776.9 - General scope of “in commerce” coverage.

    Science.gov (United States)

    2010-07-01

    ... Engaging âin Commerceâ § 776.9 General scope of “in commerce” coverage. Under the definitions quoted above... employees “engaged in commerce” are employees doing work involving or related to the movement of persons or... engaged in activities which merely “affect” such interstate or foreign commerce, the courts have made it...

  13. The PACARDO research project: youthful drug involvement in Central America and the Dominican Republic Proyecto de investigación PACARDO: el consumo de drogas entre la juventud en Centroamérica y la República Dominicana

    Directory of Open Access Journals (Sweden)

    Catherine M. Dormitzer

    2004-06-01

    Full Text Available OBJECTIVE: To estimate the occurrence and school-level clustering of drug involvement among school-attending adolescent youths in each of seven countries in Latin America, drawing upon evidence from the PACARDO research project, a multinational collaborative epidemiological research study. METHODS: During 1999-2000, anonymous self-administered questionnaires on drug involvement and related behaviors were administered to a cross-sectional, nationally representative sample that included a total of 12 797 students in the following seven countries: Costa Rica (n= 1 702, the Dominican Republic (n= 2 023, El Salvador (n= 1 628, Guatemala (n= 2 530, Honduras (n= 1 752, Nicaragua (n= 1 419, and Panama (n= 1 743. (The PACARDO name concatenates PA for Panamá,CA for Centroamérica,and RDO for República Dominicana. Estimates for exposure opportunity and actual use of alcohol, tobacco, inhalants, marijuana, cocaine (crack/coca paste, amphetamines and methamphetamines, tranquilizers, ecstasy, and heroin were assessed via responses about questions on age of first chance to try each drug, and first use. Logistic regression models accounting for the complex survey design were used to estimate the associations of interest. RESULTS: Cumulative occurrence estimates for alcohol, tobacco, inhalants, marijuana, and illegal drug use for the overall sample were, respectively: 52%, 29%, 5%, 4%, and 5%. In comparison to females, males were more likely to use alcohol, tobacco, inhalants, marijuana, and illegal drugs; the odds ratio estimates were 1.3, 2.1, 1.6, 4.1, and 3.2, respectively. School-level clustering was noted in all countries for alcohol and tobacco use; it was also noted in Costa Rica, El Salvador, Guatemala, and Panama for illegal drug use. CONCLUSIONS: This report sheds new light on adolescent drug experiences in Panama, the five Spanish-heritage countries of Central America, and the Dominican Republic, and presents the first estimates of school

  14. REGIA, An EU Project on Functional Genomics of Transcription Factors from Arabidopsis thaliana

    Directory of Open Access Journals (Sweden)

    Javier Paz-Ares

    2002-01-01

    and metabolic profiling; 5. the systematic analysis of interactions between TFs; and 6. the generation of a bioinformatics infrastructure to access and integrate all this information. We expect that this programme will establish the full biotechnological potential of plant TFs, and provide insights into hierarchies, redundancies, and interdependencies, and their evolution. The project involves the preparation of both a TF gene array for expression analysis and a normalised full length open reading frame (ORF library of TFs in a yeast two hybrid vector; the applications of these resources should extend beyond the scope of this programme.

  15. Post Irradiation Examination Plan for High-Burnup Demonstration Project Sister Rods

    Energy Technology Data Exchange (ETDEWEB)

    Scaglione, John M [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Montgomery, Rose [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bevard, Bruce Balkcom [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-04-01

    This test plan describes the experimental work to be implemented by the U.S. Department of Energy (DOE) Office of Nuclear Energy (NE) to characterize high burnup (HBU) spent nuclear fuel (SNF) in conjunction with the High Burnup Dry Storage Cask Research and Development Project and serves to coordinate and integrate the multi-year experimental program to collect and develop data regarding the continued storage and eventual transport of HBU (i.e., >45 GWd/MTU) SNF. The work scope involves the development, performance, technical integration, and oversight of measurements and collection of relevant data, guided by analyses and demonstration of need.

  16. Project control - the next generation

    International Nuclear Information System (INIS)

    Iorii, V.F.; McKinnon, B.L.

    1993-01-01

    The Yucca Mountain Site Characterization Project (YMP) is the U.S. Department of Energy's (DOE) second largest Major System Acquisition Project. We have developed an integrated planning and control system (called PACS) that we believe represents the 'Next Generation' in project control. PACS integrates technical scope, cost, and schedule information for over 50 participating organizations and produces performances measurement reports for science and engineering managers at all levels. Our 'Next Generation' project control too, PACS, has been found to be in compliance with the new DOE Project Control System Guidelines. Additionally, the nuclear utility oversight group of the Edison Electric Institute has suggested PACS be used as a model for other civilian radioactive waste management projects. A 'Next Generation' project control tool will be necessary to do science in the 21st century

  17. Design Quality in the Context of Healthcare Environments: A Scoping Review.

    Science.gov (United States)

    Anåker, Anna; Heylighen, Ann; Nordin, Susanna; Elf, Marie

    2017-07-01

    We explored the concept of design quality in relation to healthcare environments. In addition, we present a taxonomy that illustrates the wide range of terms used in connection with design quality in healthcare. High-quality physical environments can promote health and well-being. Developments in healthcare technology and methodology put high demands on the design quality of care environments, coupled with increasing expectations and demands from patients and staff that care environments be person centered, welcoming, and accessible while also supporting privacy and security. In addition, there are demands that decisions about the design of healthcare architecture be based on the best available information from credible research and the evaluation of existing building projects. The basic principles of Arksey and O'Malley's model of scoping review design were used. Data were derived from literature searches in scientific databases. A total of 18 articles and books were found that referred to design quality in a healthcare context. Design quality of physical healthcare environments involves three different themes: (i) environmental sustainability and ecological values, (ii) social and cultural interactions and values, and (iii) resilience of the engineering and building construction. Design quality was clarified herein with a definition. Awareness of what is considered design quality in relation to healthcare architecture could help to design healthcare environments based on evidence. To operationalize the concept, its definition must be clear and explicit and able to meet the complex needs of the stakeholders in a healthcare context, including patients, staff, and significant others.

  18. STAKEHOLDER INVOLVEMENT THROUGHOUT HEALTH TECHNOLOGY ASSESSMENT: AN EXAMPLE FROM PALLIATIVE CARE.

    Science.gov (United States)

    Brereton, Louise; Wahlster, Philip; Mozygemba, Kati; Lysdahl, Kristin Bakke; Burns, Jake; Polus, Stephanie; Tummers, Marcia; Refolo, Pietro; Sacchini, Dario; Leppert, Wojciech; Chilcott, James; Ingleton, Christine; Gardiner, Clare; Goyder, Elizabeth

    2017-01-01

    Internationally, funders require stakeholder involvement throughout health technology assessment (HTA). We report successes, challenges, and lessons learned from extensive stakeholder involvement throughout a palliative care case study that demonstrates new concepts and methods for HTA. A 5-step "INTEGRATE-HTA Model" developed within the INTEGRATE-HTA project guided the case study. Using convenience or purposive sampling or directly / indirectly identifying and approaching individuals / groups, stakeholders participated in qualitative research or consultation meetings. During scoping, 132 stakeholders, aged ≥ 18 years in seven countries (England, Italy, Germany, The Netherlands, Norway, Lithuania, and Poland), highlighted key issues in palliative care that assisted identification of the intervention and comparator. Subsequently stakeholders in four countries participated in face-face, telephone and / or video Skype meetings to inform evidence collection and / or review assessment results. An applicability assessment to identify contextual and implementation barriers and enablers for the case study findings involved twelve professionals in the three countries. Finally, thirteen stakeholders participated in a mock decision-making meeting in England. Views about the best methods of stakeholder involvement vary internationally. Stakeholders make valuable contributions in all stages of HTA; assisting decision making about interventions, comparators, research questions; providing evidence and insights into findings, gap analyses and applicability assessments. Key challenges exist regarding inclusivity, time, and resource use. Stakeholder involvement is feasible and worthwhile throughout HTA, sometimes providing unique insights. Various methods can be used to include stakeholders, although challenges exist. Recognition of stakeholder expertise and further guidance about stakeholder consultation methods is needed.

  19. Cloud Computing : Goals, Issues, SOA, Integrated Technologies and Future -scope

    Directory of Open Access Journals (Sweden)

    V. Madhu Viswanatham

    2016-10-01

    Full Text Available The expansion of networking infrastructure has provided a novel way to store and access resources in a reliable, convenient and affordable means of technology called the Cloud. The cloud has become so popular and established its dominance in many recent world innovations and has highly influenced the trend of the Business process Management with the advantage of shared resources. The ability to remain disaster tolerant, on-demand scalability, flexible deployment and cost effectiveness has made the future world technologies like Internet of Things, to determine the cloud as their data and processing center. However, along with the implementation of cloud based technologies, we must also address the issues involved in its realization. This paper is a review on the advancements, scopes and issues involved in realizing a secured cloud powered environments.

  20. Scope of environmental risk management

    Energy Technology Data Exchange (ETDEWEB)

    O' Riordan, T

    1979-01-01

    Environmental risk management embraces three techniques for project appraisal: cost/benefit analysis, environmental impact analysis and risk assessment. It also explicitly relates scientific investigations to political judgments, sometimes so closely that the two cannot be separated. Indeed it is now apparent that environmental risk management encompasses procedures both to review the relative merits and priorities of policies as well as to appraise the environmental risks of particular schemes. Until recently this relationship has not been fully appreciated, so much imagination and innovation is still required to develop the most-suitable mechanisms for review.

  1. Software-Enabled Project Management Techniques and Their Relationship to the Triple Constraints

    Science.gov (United States)

    Elleh, Festus U.

    2013-01-01

    This study investigated the relationship between software-enabled project management techniques and the triple constraints (time, cost, and scope). There was the dearth of academic literature that focused on the relationship between software-enabled project management techniques and the triple constraints (time, cost, and scope). Based on the gap…

  2. Factors associated with emergency medical services scope of practice for acute cardiovascular events.

    Science.gov (United States)

    Williams, Ishmael; Valderrama, Amy L; Bolton, Patricia; Greek, April; Greer, Sophia; Patterson, Davis G; Zhang, Zefeng

    2012-01-01

    To examine prehospital emergency medical services (EMS) scope of practice for acute cardiovascular events and characteristics that may affect scope of practice; and to describe variations in EMS scope of practice for these events and the characteristics associated with that variability. In 2008, we conducted a telephone survey of 1,939 eligible EMS providers in nine states to measure EMS agency characteristics, medical director involvement, and 18 interventions authorized for prehospital care of acute cardiovascular events by three levels of emergency medical technician (EMT) personnel. A total of 1,292 providers responded to the survey, for a response rate of 67%. EMS scope of practice interventions varied by EMT personnel level, with the proportion of authorized interventions increasing as expected from EMT-Basic to EMT-Paramedic. Seven of eight statistically significant associations indicated that EMS agencies in urban settings were less likely to authorize interventions (odds ratios department-based EMS agencies were two to three times more likely to authorize interventions for EMT-Intermediate personnel. Volunteer EMS agencies were more than twice as likely as nonvolunteer agencies to authorize interventions for EMT-Basic and EMT-Intermediate personnel but were less likely to authorize any one of the 11 interventions for EMT-Paramedics. Greater medical director involvement was associated with greater likelihood of authorization of seven of the 18 interventions for EMT-Basic and EMT-Paramedic personnel but had no association with EMT-Intermediate personnel. We noted statistically significant variations in scope of practice by rural vs. urban setting, medical director involvement, and type of EMS service (fire department-based/non-fire department-based; volunteer/paid). These variations highlight local differences in the composition and capacity of EMS providers and offer important information for the transition towards the implementation of a national scope of

  3. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  4. Harry Potter and the sorcerer's scope: latent scope biases in explanatory reasoning.

    Science.gov (United States)

    Khemlani, Sangeet S; Sussman, Abigail B; Oppenheimer, Daniel M

    2011-04-01

    What makes a good explanation? We examine the function of latent scope, i.e., the number of unobserved phenomena that an explanation can account for. We show that individuals prefer narrow latent scope explanations-those that account for fewer unobserved effects-to broader explanations. In Experiments 1a-d, participants found narrow latent scope explanations to be both more satisfying and more likely. In Experiment 2 we directly manipulated base rate information and again found a preference for narrow latent scope explanations. Participants in Experiment 3 evaluated more natural explanations of unexpected observations, and again displayed a bias for narrow latent scope explanations. We conclude by considering what this novel bias tells us about how humans evaluate explanations and engage in causal reasoning.

  5. FLEXIBLE SCOPE IN ACCREDITATION - INTRODUCING VAGUENESS OR BETTER EXPRESSION OF SCOPE

    Directory of Open Access Journals (Sweden)

    Miloš Jelić

    2007-09-01

    Full Text Available Historically, laboratory accreditation has been grounded on fixed scope of accreditation to establish precisely and unambiguously the range of tests and calibrations covered by a granted accreditation. By the time elapsed it was noticed that such approach sometimes appears to be restrictive since it constrains new or modified methods to be added to a laboratory's scope, even where competence in this general area has already been demonstrated. Accreditation of a flexible scope places more of the responsibility onto the laboratory itself because it imposes to the laboratory to establish and maintain management system that can control its proposed approach. Flexible scope of accreditation yields benefit to all accreditation stakeholders but, on the other hand, introduces more requiring interpretations of relevant standard clauses and includes the bounds of the scope which are defined in more distinct way.

  6. The Dwarf Project: Vidojevica

    Science.gov (United States)

    Vince, O.

    2013-05-01

    The DWARF project is an important international project for observing eclipsing binary stars and searching for third companion which orbit around both stars. Recently, a group of researchers at the Astronomical Observatory of Belgrade joined this project using the 60 cm telescope at the Astronomical Station Vidojevica for observations. All the equipment and the human potential involved with this project from Serbia will be described in this paper.

  7. Brownfields City of Houston Solar Project: Solar Power Analysis and Design Specifications

    Science.gov (United States)

    This document details the scope of work elements completed in support of this project, as well as recommendations for next steps towards solar project development and power purchase agreement negotiation and finalization.

  8. Project W-420 Stack Monitoring system upgrades conceptual design report

    International Nuclear Information System (INIS)

    TUCK, J.A.

    1998-01-01

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks

  9. Project W-420 Stack Monitoring system upgrades conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    TUCK, J.A.

    1998-11-06

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks.

  10. Involving healthcare professionals and family carers in setting research priorities for end-of-life care.

    Science.gov (United States)

    Diffin, Janet; Spence, Michael; Spencer, Rebecca; Mellor, Peter; Grande, Gunn

    2017-02-02

    It is important to ensure regional variances are considered when setting future end-of-life research priorities, given the differing demographics and service provision. This project sought to identify end-of-life research priorities within Greater Manchester (United Kingdom). Following an initial scoping exercise, six topics within the 10 national priorities outlined by The Palliative and end-of-life care Priority Setting Partnership were selected for exploration. A workshop involving 32 healthcare professionals and a consultation process with 26 family carers was conducted. Healthcare professionals and carers selected and discussed the topics important to them. The topics selected most frequently by both healthcare professionals and carers were 'Access to 24 hour care', 'Planning end-of-life care in advance' and 'Staff and carer education'. Healthcare professionals also developed research questions for their topics of choice which were refined to incorporate carers' views. These questions are an important starting point for future end-of-life research within Greater Manchester.

  11. Warm Water Oxidation Verification - Scoping and Stirred Reactor Tests

    Energy Technology Data Exchange (ETDEWEB)

    Braley, Jenifer C.; Sinkov, Sergey I.; Delegard, Calvin H.; Schmidt, Andrew J.

    2011-06-15

    Scoping tests to evaluate the effects of agitation and pH adjustment on simulant sludge agglomeration and uranium metal oxidation at {approx}95 C were performed under Test Instructions(a,b) and as per sections 5.1 and 5.2 of this Test Plan prepared by AREVA. (c) The thermal testing occurred during the week of October 4-9, 2010. The results are reported here. For this testing, two uranium-containing simulant sludge types were evaluated: (1) a full uranium-containing K West (KW) container sludge simulant consisting of nine predominant sludge components; (2) a 50:50 uranium-mole basis mixture of uraninite [U(IV)] and metaschoepite [U(VI)]. This scoping study was conducted in support of the Sludge Treatment Project (STP) Phase 2 technology evaluation for the treatment and packaging of K-Basin sludge. The STP is managed by CH2M Hill Plateau Remediation Company (CHPRC) for the U.S. Department of Energy. Warm water ({approx}95 C) oxidation of sludge, followed by immobilization, has been proposed by AREVA and is one of the alternative flowsheets being considered to convert uranium metal to UO{sub 2} and eliminate H{sub 2} generation during final sludge disposition. Preliminary assessments of warm water oxidation have been conducted, and several issues have been identified that can best be evaluated through laboratory testing. The scoping evaluation documented here was specifically focused on the issue of the potential formation of high strength sludge agglomerates at the proposed 95 C process operating temperature. Prior hydrothermal tests conducted at 185 C produced significant physiochemical changes to genuine sludge, including the formation of monolithic concretions/agglomerates that exhibited shear strengths in excess of 100 kPa (Delegard et al. 2007).

  12. Warm Water Oxidation Verification - Scoping and Stirred Reactor Tests

    International Nuclear Information System (INIS)

    Braley, Jenifer C.; Sinkov, Sergey I.; Delegard, Calvin H.; Schmidt, Andrew J.

    2011-01-01

    Scoping tests to evaluate the effects of agitation and pH adjustment on simulant sludge agglomeration and uranium metal oxidation at ∼95 C were performed under Test Instructions(a,b) and as per sections 5.1 and 5.2 of this Test Plan prepared by AREVA. (c) The thermal testing occurred during the week of October 4-9, 2010. The results are reported here. For this testing, two uranium-containing simulant sludge types were evaluated: (1) a full uranium-containing K West (KW) container sludge simulant consisting of nine predominant sludge components; (2) a 50:50 uranium-mole basis mixture of uraninite (U(IV)) and metaschoepite (U(VI)). This scoping study was conducted in support of the Sludge Treatment Project (STP) Phase 2 technology evaluation for the treatment and packaging of K-Basin sludge. The STP is managed by CH2M Hill Plateau Remediation Company (CHPRC) for the U.S. Department of Energy. Warm water (∼95 C) oxidation of sludge, followed by immobilization, has been proposed by AREVA and is one of the alternative flowsheets being considered to convert uranium metal to UO 2 and eliminate H 2 generation during final sludge disposition. Preliminary assessments of warm water oxidation have been conducted, and several issues have been identified that can best be evaluated through laboratory testing. The scoping evaluation documented here was specifically focused on the issue of the potential formation of high strength sludge agglomerates at the proposed 95 C process operating temperature. Prior hydrothermal tests conducted at 185 C produced significant physiochemical changes to genuine sludge, including the formation of monolithic concretions/agglomerates that exhibited shear strengths in excess of 100 kPa (Delegard et al. 2007).

  13. Steam generator replacement project in 2000

    International Nuclear Information System (INIS)

    Cerjak, J.; Holz, R.; Haus, J.; Gloaguen, C.

    1999-01-01

    NE Krsko has awarded the contract for the Steam Generator Replacement Project, which is one of the modernization projects in Krsko, to the Consortium of Siemens / Framatome in February 1998. This paper deals with the various aspects of the project: scope planning, engineering, preparation of modification packages for licensing, management, major techniques used, etc., showing also the status of the activities for the project which are scheduled to be performed in April through June 2000. The project is being performed on a turnkey basis, that means the Consortium is performing all engineering, preparation of the modification packages and site activities; NE Krsko is dealing with the licensing of the project.(author)

  14. Preliminary Economics Evaluation and Impact Assessment of The Agribusiness Development Project at RRC Perkerra

    International Nuclear Information System (INIS)

    Cheng'ole, J.M.

    2002-01-01

    The attainment of sustainable food security in the drought-stricken sub-Saharan Africa requires farmer participatory research into the development and adaptation of agricultural technologies and their dissemination for adoption by the farmers. The Agribusiness Development Support Project (ADSP) was initiated in the Arid and semi-arid areas (ASALs) of and surrounding Baringo District to acquire test and disseminate improved vegetable varieties, with significant farmer involvement. The project aims at commercializing horticulture and seed technologies. Three superior onion varieties have been tested on-farm and found to be higher yielding than the traditional varieties. More than 9000 improved fruit tree seedlings have been sold, and their popularity is such that, in favourable weather conditions, the Centre's nurseries cannot effectively meet the demand by farmers and groups. As a result, mechanisms to enlarge the scope of the project to cover more districts and to encourage adoption in current operational area should be affected

  15. Overview criteria for the environmental, safety and health evaluation of remedial action project planning

    International Nuclear Information System (INIS)

    Stenner, R.D.; Denham, D.H.

    1984-10-01

    Overview criteria (i.e., subject areas requiring review) for evaluating remedial action project plans with respect to environmental, safety and health issues were developed as part of a Department of Energy, Office of Operational Safety, technical support project. Nineteen elements were identified as criteria that should be addressed during the planning process of a remedial action (decontamination and decommissioning) project. The scope was interpreted broadly enough to include such environmental, safety and health issues as public image, legal obligation and quality assurance, as well as more obvious concerns such as those involving the direct protection of public and worker health. The nineteen elements are discussed along with suggested ways to use a data management software system to organize and report results

  16. One project's waste is another project's resource

    International Nuclear Information System (INIS)

    Short, J.

    1997-01-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables

  17. Energy Data Base: subject categories and scope

    International Nuclear Information System (INIS)

    Bost, D.E.

    1985-03-01

    The subject scope of the Energy Data Base (EDB) encompasses all DOE-sponsored research. Broadly defined, EDB subject scope includes all technological aspects of energy production, conversion, and efficient utilization, and the economic, social, and political aspects as well. Scope notes are provided to define the extent of interest in certain subject areas, particularly areas of basic research. Cross references between categories are provided to aid both the categorization of information and its retrieval. Citations entered into DOE's computerized bibliographic information system are assigned six-digit subject category numbers to broadly group information for storage, retrieval, and manipulation. These numbers are used in the preparation of printed documents, such as bibliographies and abstract journals, to arrange the citations and to aid searching on the DOE/RECON on-line system

  18. The NIOSH Radiation Dose Reconstruction Project: managing technical challenges.

    Science.gov (United States)

    Moeller, Matthew P; Townsend, Ronald D; Dooley, David A

    2008-07-01

    Approximately two years after promulgation of the Energy Employees Occupational Illness Compensation Program Act, the National Institute for Occupational Safety and Health Office of Compensation and Analysis Support selected a contractor team to perform many aspects of the radiation dose reconstruction process. The project scope and schedule necessitated the development of an organization involving a comparatively large number of health physicists. From the initial stages, there were many technical and managerial challenges that required continuous planning, integration, and conflict resolution. This paper identifies those challenges and describes the resolutions and lessons learned. These insights are hopefully useful to managers of similar scientific projects, especially those requiring significant data, technical methods, and calculations. The most complex challenge has been to complete defensible, individualized dose reconstructions that support timely compensation decisions at an acceptable production level. Adherence to applying claimant-favorable and transparent science consistent with the requirements of the Act has been the key to establishing credibility, which is essential to this large and complex project involving tens of thousands of individual stakeholders. The initial challenges included garnering sufficient and capable scientific staff, developing an effective infrastructure, establishing necessary methods and procedures, and integrating activities to ensure consistent, quality products. The continuing challenges include maintaining the project focus on recommending a compensation determination (rather than generating an accurate dose reconstruction), managing the associated very large data and information management challenges, and ensuring quality control and assurance in the presence of an evolving infrastructure. The lessons learned concern project credibility, claimant favorability, project priorities, quality and consistency, and critical

  19. Information management needs for Fort Calhoun's design basis reconstitution project

    International Nuclear Information System (INIS)

    Beach, D.R.; Erickson, E.A.; Gambhir, S.K.; Parsons, R.D.

    1989-01-01

    While the need for information management is not new to the nuclear industry or Omaha Public Power District (OPPD), the interrelationship among design information, multiple systems, and design basis issues has necessitated the management of this information in new ways. The project team involved in the reconstitution of the design basis for OPPD's Fort Calhoun nuclear station has experienced the need for the developed effective methods for managing the vast amount of interrelated information associated with this effort. This management of information has been necessary to ensure that design basis documents (DBDs) adequately reflect the interrelated nature of component, system, and plant design; are complete and accurate; and are produced and maintained in a cost-effective manner. Fort Calhoun's aggressive design basis reconstitution project began in early 1987. The present scope of the project includes the production of 52 system and plant level DBDs; currently the project is ∼50% complete with DBDs in various stages of completion, from pilot DBDs through DBDs with approved formats, which have been issued for use. The experience in producing these documents has lead to a growing understanding of the special need for information management in each stage of the project. The development of the information tracking and management processes for the various stages of DBD development has proven to be cost-effective and gives a level of assurance that information has been included in the DBDs consistently and accurately

  20. Using project management techniques in hydro-relicensing

    International Nuclear Information System (INIS)

    Dominie, D.; Richard, J.

    1991-01-01

    This paper reports that to answer a pressing need for managing today's complex process and requirements of hydro relicensing, Central Maine Power Company has applied the principles of project management, including the use of computerized scheduling to its hydro relicensing efforts. This approach involves early inter-departmental cooperation in mapping out critical path scheduling by requiring the project team to: Outline the scope of the project in its entirety. Clarify and define components of the project. Quantify and categorize assumptions and dependencies. Identify constraints. The computer-generated schedule of this cooperative planning effort provides a graphic representation of the team's plan and become the focal point for refinements and adjustments necessary to complete an application on time. The use of project management techniques facilities team understanding of the realities and limitations in the relicensing process. These techniques encourage cooperative action, and use a solution-oriented process resulting in a product which can be a useful tool in communicating with resource agencies and regulators

  1. JPL Year 2000 Project. A Project Manager's Observations: Y2k

    Science.gov (United States)

    Mathison, Richard P. (Technical Monitor)

    1999-01-01

    This paper presents observations from a project manager on the Y2K problem. The topics include: 1) Agenda: 2) Scope; 3) Project Organization; 4) The Fixes; 5) The Toughest Part; 6) Validation versus Time; and 7) Information Sources. This paper is in viewgraph form.

  2. Technical program plan, Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    1979-12-01

    The Basalt Waste Isolation Project (BWIP) program as administered by the DOE's Richland Operations Office and Rockwell Hanford Operations is described. The objectives, scope and scientific technologies are discussed. The work breakdown structure of the project includes: project management and support, systems integration, geosciences, hydrology, engineered barriers, test facility design and construction, engineering testing, repository studies, and schedules. The budget of the program including operating and capital cost control is also included

  3. Male involvement: the missing dimension in promoting child spacing ...

    African Journals Online (AJOL)

    Greater sensitivity to information needs for men, the training of male medical staff in child spacing and orienting them to the concept could to such staff acting as counsellors for fellow men beside their other responsibilities. There is great scope in the country for involving men in child spacing and the number of agencies ...

  4. RBMK full scope simulator gets virtual refuelling machine

    International Nuclear Information System (INIS)

    Khoudiakov, M.; Slonimsky, V.; Mitrofanov, S.

    2006-01-01

    The paper describes a continuation of efforts of an international Russian-Norwegian joint team to drastically increase operational safety during the refuelling process of an RBMK-type reactor by implementing a training simulator based on an innovative Virtual Reality (VR) approach. During the preceding stage of the project a display-based simulator was extended with VR models of the real Refueling Machine (RM) and its environment in order to improve both the learning process and operation's effectiveness. The simulator's challenge is to support the performance (operational activity) of RM operational staff firstly and to take major part in developing basic knowledge and skills as well as to keep skilled staff in close touch with the complex machinery of the Refueling Machine. At the given 2nd stage the functional scope of the VR-simulator was greatly enhanced - firstly, by connecting to the RBMK-unit full-scope simulator, and, secondly, by a training program and simulator model upgrade. (author)

  5. Work motivation in health care: a scoping literature review.

    Science.gov (United States)

    Perreira, Tyrone A; Innis, Jennifer; Berta, Whitney

    2016-12-01

    The aim of this scoping literature review was to examine and summarize the factors, context, and processes that influence work motivation of health care workers. A scoping literature review was done to answer the question: What is known from the existing empirical literature about factors, context, and processes that influence work motivation of health care workers? This scoping review used the Arksey and O'Malley framework to describe and summarize findings. Inclusion and exclusion criteria were developed to screen studies. Relevant studies published between January 2005 and May 2016 were identified using five electronic databases. Study abstracts were screened for eligibility by two reviewers. Following this screening process, full-text articles were reviewed to determine the eligibility of the studies. Eligible studies were then evaluated by coding findings with descriptive labels to distinguish elements that appeared pertinent to this review. Coding was used to form groups, and these groups led to the development of themes. Twenty-five studies met the eligibility criteria for this literature review. The themes identified were work performance, organizational justice, pay, status, personal characteristics, work relationships (including bullying), autonomy, organizational identification, training, and meaningfulness of work. Most of the research involved the use of surveys. There is a need for more qualitative research and for the use of case studies to examine work motivation in health care organizations. All of the studies were cross-sectional. Longitudinal research would provide insight into how work motivation changes, and how it can be influenced and shaped. Several implications for practice were identified. There is a need to ensure that health care workers have access to training opportunities, and that autonomy is optimized. To improve work motivation, there is a need to address bullying and hostile behaviours in the workplace. Addressing the factors that

  6. Scope of practice review: providers for triage and assessment of spine-related disorders

    Directory of Open Access Journals (Sweden)

    Boakye O

    2016-05-01

    Full Text Available Omenaa Boakye,1 Arden Birney,1 Esther Suter,1 Leah Adeline Phillips,2 Victoria YM Suen3 1Workforce Research and Evaluation, Alberta Health Services, Calgary, 2College of Licensed Practical Nurses of Alberta, Edmonton, 3Addiction and Mental Health SCN, Alberta Health Services, Edmonton, AB, Canada Purpose: This study explored which health care providers could be involved in centralized intake for patients with nonspecific low back pain to enhance access, continuity, and appropriateness of care. Methods: We reviewed the scope of practice regulations for a range of health care providers. We also conducted telephone interviews with 17 individuals representing ten provincial colleges and regulatory bodies to further understand providers' legislated scopes of practice. Activities relevant to triaging and assessing patients with low back pain were mapped against professionals' scope of practice. Results: Family physicians and nurse practitioners have the most comprehensive scopes and can complete all restricted activities for spine assessment and triage, while the scope of registered nurses and licensed practical nurses are progressively narrower. Chiropractors, occupational therapists, physiotherapists, and athletic therapists are considered experts in musculoskeletal assessments and appear best suited for musculoskeletal specific assessment and triage. Other providers may play a complementary role depending on the individual patient needs. Conclusion: These findings indicate that an interprofessional assessment and triage team that includes allied health professionals would be a feasible option to create a centralized intake model. Implementation of such teams would require removing barriers that currently prevent providers from delivering on their full scope of practice. Keywords: scope of practice review, low back pain, integrated service model, centralized intake, interprofessional team

  7. 75 FR 36301 - Review and Approval of Projects

    Science.gov (United States)

    2010-06-25

    ... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Parts 806 and 808 Review and Approval of Projects AGENCY... document contains proposed rules that would amend the project review regulations of the Susquehanna River... the scope of withdrawals requiring review and approval; improve notice procedures for all project...

  8. First, build the project team

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, J.C. [Duke/Fluor Daniel, Charlotte, NC (United States)

    1997-03-01

    The EPC consortium of American, Japanese and Indonesian companies has been formed to construct the first phase of the coal-fired Paiton Power Project in Indonesia under a lump sum turnkey contract. A Consortium Agreement defines the respective roles, scope and responsibilities, as well as allocation of risks and rewards for each member. The roles of members have been assigned to match their experience and expertise and a Division of Responsibility document has been drawn up for each stage of the project. The management of the project depends on an effective team aligning the consortium members to a common set of project goals and objectives. Communication and understanding are all important. The project team have overcome some of the challenges of differences in culture, language, contractual practice and experience between the members. Some of the systems which are in place to minimise the effect of these differences and to focus on the execution of the project are outlined. (UK)

  9. Scope of physician procedures independently billed by mid-level providers in the office setting.

    Science.gov (United States)

    Coldiron, Brett; Ratnarathorn, Mondhipa

    2014-11-01

    Mid-level providers (nurse practitioners and physician assistants) were originally envisioned to provide primary care services in underserved areas. This study details the current scope of independent procedural billing to Medicare of difficult, invasive, and surgical procedures by medical mid-level providers. To understand the scope of independent billing to Medicare for procedures performed by mid-level providers in an outpatient office setting for a calendar year. Analyses of the 2012 Medicare Physician/Supplier Procedure Summary Master File, which reflects fee-for-service claims that were paid by Medicare, for Current Procedural Terminology procedures independently billed by mid-level providers. Outpatient office setting among health care providers. The scope of independent billing to Medicare for procedures performed by mid-level providers. In 2012, nurse practitioners and physician assistants billed independently for more than 4 million procedures at our cutoff of 5000 paid claims per procedure. Most (54.8%) of these procedures were performed in the specialty area of dermatology. The findings of this study are relevant to safety and quality of care. Recently, the shortage of primary care clinicians has prompted discussion of widening the scope of practice for mid-level providers. It would be prudent to temper widening the scope of practice of mid-level providers by recognizing that mid-level providers are not solely limited to primary care, and may involve procedures for which they may not have formal training.

  10. Involving Employees in Strategy innovation

    DEFF Research Database (Denmark)

    Friis, Ole Uhrskov; Koch, Christian

    2011-01-01

    Strategy as a practice and continuous innovation approaches are combined to conceptualise dilemmas of short versus long term and to analyse a case of employee participation as a particular example of strategy innovation. The case is a medium size textile company developing its strategy involving ...... and Balanced Score Card consultancy, an ‘open space’ workshop and organized strategy projects. Especially the latter two are important in facilitating the employee involvement. The case however also exhibit enterprise situated praxis’s like mitigation of taboos....

  11. Effective Parental Involvement in Education: Experiences and Perceptions of Turkish Teachers from Private Schools

    Science.gov (United States)

    Gokturk, Soheyda; Dinckal, Selin

    2018-01-01

    Parental involvement has been associated with numerous student benefits. However, related literature reveals that neither parents nor teachers are content with the scope and depth of parental involvement in schools. This may be partly due to differential understandings that both sides have on the concept of parental involvement. In this study,…

  12. Thermomechanical scoping calculations for the waste package environment tests

    International Nuclear Information System (INIS)

    Butkovich, T.R.; Yow, J.L. Jr.

    1986-03-01

    During the site characterization phase of the Nevada Nuclear Waste Storage Investigation Project, tests are planned to provide field information on the hydrological and thermomechanical environment. These results are needed for assessing performance of stored waste packages emplaced at depth in excavations in a rock mass. Scoping calculations were performed to provide information on displacements and stress levels attained around excavations in the rock mass from imposing a thermal load designed to simulate the heat produced by radioactive decay. In this way, approximate levels of stresses and displacements are available for choosing instrumentation type and sensitivity as well as providing indications for optimizing instrument emplacement during the test. 7 refs., 9 figs., 1 tab

  13. From industry to academia: Benefits of integrating a professional project management standard into (geo)science research

    Science.gov (United States)

    Cristini, Luisa

    2017-04-01

    Scientific and technological research carried out within universities and public research institutions often involves large collaborations across several countries. Despite the considerable budget (typically millions of Euros), the high expectations (high impact scientific findings, new technological developments and links with policy makers, industry and civil society) and the length of the project over several years, these international projects often rely heavily on the personal skills of the management team (project coordinator, project manager, principal investigators) without a structured, transferable framework. While this approach has become an established practice, it's not ideal and can jeopardise the success of the entire effort with consequences ranging from schedule delays, loss of templates/systems, financial charges and ultimately project failure. In this presentation I will show the advantages of integrating a globally recognised standard for professional project management, such as the PMP® by the Project Management Institute, into academic research. I will cover the project management knowledge areas (integration management, scope management, time management, cost management, quality management, human resources management, risk management, procurement management, and stakeholder management) and the processes within these throughout the phases of the project lifetime (project initiation, planning, executing, monitoring and controlling, and closure). I will show how application of standardised, transferable procedures, developed within the business & administration sector, can benefit academia and more generally scientific research.

  14. Roles for librarians in systematic reviews: a scoping review

    Science.gov (United States)

    Spencer, Angela J.; Eldredge, Jonathan D.

    2018-01-01

    Objective What roles do librarians and information professionals play in conducting systematic reviews? Librarians are increasingly called upon to be involved in systematic reviews, but no study has considered all the roles librarians can perform. This inventory of existing and emerging roles aids in defining librarians’ systematic reviews services. Methods For this scoping review, the authors conducted controlled vocabulary and text-word searches in the PubMed; Library, Information Science & Technology Abstracts; and CINAHL databases. We separately searched for articles published in the Journal of the European Association for Health Information and Libraries, Evidence Based Library and Information Practice, the Journal of the Canadian Heath Libraries Association, and Hypothesis. We also text-word searched Medical Library Association annual meeting poster and paper abstracts. Results We identified 18 different roles filled by librarians and other information professionals in conducting systematic reviews from 310 different articles, book chapters, and presented papers and posters. Some roles were well known such as searching, source selection, and teaching. Other less documented roles included planning, question formulation, and peer review. We summarize these different roles and provide an accompanying bibliography of references for in-depth descriptions of these roles. Conclusion Librarians play central roles in systematic review teams, including roles that go beyond searching. This scoping review should encourage librarians who are fulfilling roles that are not captured here to document their roles in journal articles and poster and paper presentations. PMID:29339933

  15. 21 CFR 814.1 - Scope.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Scope. 814.1 Section 814.1 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES PREMARKET... paragraph (a), effective Aug. 16, 2010. For the convenience of the user, the revised text is set forth as...

  16. 21 CFR 17.1 - Scope.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Scope. 17.1 Section 17.1 Food and Drugs FOOD AND... Food, Drug, and Cosmetic Act (the act) authorizing civil money penalties for certain violations of the... trial data bank and section 303(f)(4) of the act authorizing civil money penalties for certain...

  17. 10 CFR 707.2 - Scope.

    Science.gov (United States)

    2010-01-01

    ...) High risk of danger to life, the environment, public health and safety, or national security; or (iii... authority of the Atomic Energy Act of 1954, as amended: (1) Management and operating contracts; and (2... WORKPLACE SUBSTANCE ABUSE PROGRAMS AT DOE SITES General Provisions § 707.2 Scope. (a) This part applies to...

  18. 30 CFR 879.1 - Scope.

    Science.gov (United States)

    2010-07-01

    ... OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION ACQUISITION, MANAGEMENT, AND DISPOSITION OF LANDS AND WATER § 879.1 Scope. This part establishes procedures for acquisition of eligible land and water resources for emergency abatement activities and...

  19. 12 CFR 263.400 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Scope. 263.400 Section 263.400 Banks and Banking FEDERAL RESERVE SYSTEM (CONTINUED) BOARD OF GOVERNORS OF THE FEDERAL RESERVE SYSTEM RULES OF PRACTICE FOR HEARINGS Removal, Suspension, and Debarment of Accountants From Performing Audit Services...

  20. 32 CFR 855.4 - Scope.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Scope. 855.4 Section 855.4 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE AIRCRAFT CIVIL AIRCRAFT USE OF UNITED STATES... requirements take precedence over authorized civil aircraft use. This part carries the force of US law, and...

  1. Circuit : The ?SCOPE: A poor man's oscilloscope

    NARCIS (Netherlands)

    Dekker, R.

    2008-01-01

    The oscilloscope is still one of the most important measurement tools of the electronic engineer. With the advent of the often very reasonably priced USB scopes, such an instrument is now within reach of everybody. Twentyfive years ago that was quite a different story. A (good) oscilloscope was then

  2. 48 CFR 3004.470-1 - Scope.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Scope. 3004.470-1 Section 3004.470-1 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY... unclassified facilities, Information Technology (IT) resources, and sensitive information during the...

  3. 23 CFR 1313.1 - Scope.

    Science.gov (United States)

    2010-04-01

    ... traffic safety problems resulting from individuals driving motor vehicles while under the influence of... TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION INCENTIVE GRANT CRITERIA FOR ALCOHOL-IMPAIRED DRIVING PREVENTION PROGRAMS § 1313.1 Scope. This part establishes criteria, in accordance with 23 U.S.C...

  4. 28 CFR 90.60 - Scope.

    Science.gov (United States)

    2010-07-01

    ... domestic violence as a serious violation of criminal law. ... Administration DEPARTMENT OF JUSTICE (CONTINUED) VIOLENCE AGAINST WOMEN Arrest Policies in Domestic Violence Cases § 90.60 Scope. This subpart sets forth the statutory framework of the Violence Against Women Act's...

  5. 29 CFR 1607.2 - Scope.

    Science.gov (United States)

    2010-07-01

    ... PROCEDURES (1978) General Principles § 1607.2 Scope. A. Application of guidelines. These guidelines will be... the Department of Labor, and the contract compliance agencies until the transfer of authority... responsibilities under Federal law; by the Office of Revenue Sharing of the Department of the Treasury under the...

  6. Marine Radioecology. Current Research and Future Scope

    International Nuclear Information System (INIS)

    1967-03-01

    This report consists of answers submitted by various laboratory directors or individual investigators who responded to an International Atomic Energy Agency questionnaire concerning their present research programme, future scope of that programme, the investigators' ideas and opinions on marine radioecology research. Information on the possibility of co-operation with other laboratories is also included

  7. 41 CFR 101-39.200 - Scope.

    Science.gov (United States)

    2010-07-01

    ... FEDERAL PROPERTY MANAGEMENT REGULATIONS AVIATION, TRANSPORTATION, AND MOTOR VEHICLES 39-INTERAGENCY FLEET MANAGEMENT SYSTEMS 39.2-GSA Interagency Fleet Management System Services § 101-39.200 Scope. This subpart... Administration (GSA) Interagency Fleet Management System (IFMS). Local transportation services for Government...

  8. 15 CFR 325.1 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Scope. 325.1 Section 325.1 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE MISCELLANEOUS REGULATIONS EXPORT TRADE CERTIFICATES OF REVIEW § 325.1...

  9. 47 CFR 90.521 - Scope.

    Science.gov (United States)

    2010-10-01

    ... systems operating in the 763-775 MHz and 793-805 MHz frequency bands. It includes eligibility, operational... 47 Telecommunication 5 2010-10-01 2010-10-01 false Scope. 90.521 Section 90.521 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PRIVATE LAND MOBILE RADIO...

  10. Quantifier Scope in Categorical Compositional Distributional Semantics

    Directory of Open Access Journals (Sweden)

    Mehrnoosh Sadrzadeh

    2016-08-01

    Full Text Available In previous work with J. Hedges, we formalised a generalised quantifiers theory of natural language in categorical compositional distributional semantics with the help of bialgebras. In this paper, we show how quantifier scope ambiguity can be represented in that setting and how this representation can be generalised to branching quantifiers.

  11. 14 CFR 1216.200 - Scope.

    Science.gov (United States)

    2010-01-01

    ... Management; and, (h) Establish internal management controls to monitor NASA actions to assure compliance with... Wetlands Management § 1216.200 Scope. This subpart 1216.2 prescribes procedures to: (a) Avoid long- and... practicable alternative; (c) Reduce the risk of flood loss; (d) Minimize the impact of floods on human health...

  12. 47 CFR 1.1303 - Scope.

    Science.gov (United States)

    2010-10-01

    ... Environmental Policy Act of 1969 § 1.1303 Scope. The provisions of this subpart shall apply to all Commission actions that may or will have a significant impact on the quality of the human environment. To the extent that other provisions of the Commission's rules and regulations are inconsistent with the subpart, the...

  13. 42 CFR 423.150 - Scope.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Scope. 423.150 Section 423.150 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICARE PROGRAM VOLUNTARY MEDICARE PRESCRIPTION DRUG BENEFIT Cost Control and Quality Improvement Requirements...

  14. 42 CFR 423.452 - Scope.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Scope. 423.452 Section 423.452 Public Health... PROGRAM VOLUNTARY MEDICARE PRESCRIPTION DRUG BENEFIT Coordination of Part D Plans With Other Prescription...; establishes waivers for MA-PD plans, employer-sponsored group prescription drug plans, cost plans, and PACE...

  15. 7 CFR 3015.60 - Scope.

    Science.gov (United States)

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) OFFICE OF THE CHIEF FINANCIAL OFFICER, DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Standards for Financial Management Systems § 3015.60 Scope. This subpart contains standards for financial management systems of recipients. No additional financial...

  16. 12 CFR 19.220 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Scope. 19.220 Section 19.220 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY RULES OF PRACTICE AND PROCEDURE Procedures for... the OCC pursuant to section 38 of the Federal Deposit Insurance Act and this part. ...

  17. 12 CFR 6.20 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Scope. 6.20 Section 6.20 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY PROMPT CORRECTIVE ACTION Directives To Take Prompt... part. ...

  18. 12 CFR 13.1 - Scope.

    Science.gov (United States)

    2010-01-01

    ... COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY GOVERNMENT SECURITIES SALES PRACTICES § 13.1 Scope. This part applies to national banks that have filed notice as, or are required to file notice as.... 78o-5) and Department of the Treasury rules under section 15C (17 CFR 400.1(d) and part 401). ...

  19. 12 CFR 19.210 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Scope. 19.210 Section 19.210 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY RULES OF PRACTICE AND PROCEDURE Equal Access to... adjudicatory proceedings under this part are set forth at 31 CFR part 6. ...

  20. 12 CFR 19.230 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Scope. 19.230 Section 19.230 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY RULES OF PRACTICE AND PROCEDURE Order To Dismiss a... and part 6 of this chapter. ...

  1. Negative concord and the scope of universals

    NARCIS (Netherlands)

    Giannakidou, A

    2000-01-01

    In this paper, I propose an analysis of Greek negative concord (NC) in terms of quantifier scope. It is shown that there is no evidence that Greek NC n-words are indefinites or negative quantifiers, NC n-words are analysed as universal quantifiers, which are sensitive to negative polarity, and which

  2. 47 CFR 95.1101 - Scope.

    Science.gov (United States)

    2010-10-01

    ... SERVICES Wireless Medical Telemetry Service (WMTS) General Provisions § 95.1101 Scope. This subpart sets out the regulations governing the operation of Wireless Medical Telemetry Devices in the 608-614 MHz, 1395-1400 MHz, and 1427-1432 MHz frequency bands. See § 95.630 regarding permissible frequencies. [75...

  3. 46 CFR 161.012-1 - Scope.

    Science.gov (United States)

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Personal Flotation Device Lights § 161.012-1 Scope. (a) This subpart... approving personal flotation device lights fitted on Coast Guard approved life preservers, bouyant vests...

  4. 77 FR 38767 - Notice of Scope Rulings

    Science.gov (United States)

    2012-06-29

    ... Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue NW., Washington... each calendar quarter. Scope Rulings Completed Between October 1, 2011, and December 31, 2011: People's Republic of China A-570-967; C-570-968: Aluminum Extrusions from the People's Republic of China Requestor...

  5. 75 FR 52311 - Notice of Scope Rulings

    Science.gov (United States)

    2010-08-25

    ... Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington... calendar quarter. Scope Rulings Completed Between January 1, 2010, and March 31, 2010 People's Republic of China A-570-804: Sparklers from the People's Republic of China. Requestor: American Promotional Events...

  6. 78 FR 9370 - Notice of Scope Rulings

    Science.gov (United States)

    2013-02-08

    .... Department of Commerce, 14th Street and Constitution Avenue NW., Washington, DC 20230; telephone: 202-482...). Scope Rulings Made Between July 1, 2012, and September 30, 2012 People's Republic of China A-570-504: Petroleum Wax Candles From the People's Republic of China Requestor: FashionCraft-Excello, Inc.; six animal...

  7. 75 FR 79339 - Notice of Scope Rulings

    Science.gov (United States)

    2010-12-20

    ... Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington... calendar quarter. Scope Rulings Completed Between April 1, 2010, and June 30, 2010: People's Republic of China A-570-502: Iron Construction Castings From the People's Republic of China Requestor: National...

  8. 77 FR 52313 - Notice of Scope Rulings

    Science.gov (United States)

    2012-08-29

    .... Department of Commerce, 14th Street and Constitution Avenue NW., Washington, DC 20230; telephone: 202-482...). Scope Rulings Completed Between April 1, 2012, and June 30, 2012 People's Republic of China A-570-504: Petroleum Wax Candles from the People's Republic of China Requestor: HSE USA, Inc.; its religious cross with...

  9. 76 FR 73596 - Notice of Scope Rulings

    Science.gov (United States)

    2011-11-29

    ... Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington... calendar quarter. Scope Rulings Completed Between January 1, 2011, and March 31, 2011 People's Republic of China A-570-601: Tapered Roller Bearings from the People's Republic of China Requestor: Blackstone OTR...

  10. 77 FR 32568 - Notice of Scope Rulings

    Science.gov (United States)

    2012-06-01

    ... Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue NW., Washington... AAVID are not within the scope of the antidumping duty order; July 12, 2011. People's Republic of China A-570-928: Uncovered Innerspring Units From the People's Republic of China Requestor: No Boundaries...

  11. 78 FR 32372 - Notice of Scope Rulings

    Science.gov (United States)

    2013-05-30

    ... Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue NW., Washington, DC 20230..., S.A. de C.V. are not within the scope of the antidumping duty order; November 15, 2012. People's Republic of China A-570-836: Glycine From the People's Republic of China Requestor: Self-initiated by the...

  12. 49 CFR 1300.1 - Scope; definitions.

    Science.gov (United States)

    2010-10-01

    ... CHANGE OF RATES AND OTHER SERVICE TERMS FOR RAIL COMMON CARRIAGE § 1300.1 Scope; definitions. (a) The provisions of this part address the requirements imposed on rail carriers by 49 U.S.C. 11101(b), 11101(c... apply to any common carriage transportation or service provided by a rail carrier subject to the...

  13. 20 CFR 361.2 - Scope.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false Scope. 361.2 Section 361.2 Employees' Benefits RAILROAD RETIREMENT BOARD INTERNAL ADMINISTRATION, POLICY AND PROCEDURES RECOVERY OF DEBTS OWED TO... seq.), or the tariff laws of the United States; or to any case where collection of a debt by salary...

  14. 44 CFR 206.343 - Scope.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Scope. 206.343 Section 206.343 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND...; (2) Crisis counseling; (3) Disaster Legal services; and (4) Disaster unemployment assistance. ...

  15. 21 CFR 340.1 - Scope.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 5 2010-04-01 2010-04-01 false Scope. 340.1 Section 340.1 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS FOR HUMAN USE STIMULANT... stimulant drug product in a form suitable for oral administration is generally recognized as safe and...

  16. 34 CFR 686.30 - Scope.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false Scope. 686.30 Section 686.30 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION TEACHER EDUCATION ASSISTANCE FOR COLLEGE AND HIGHER EDUCATION (TEACH) GRANT PROGRAM...

  17. 47 CFR 90.350 - Scope.

    Science.gov (United States)

    2010-10-01

    ... transportation infrastructure and to develop and implement the nation's intelligent transportation systems. It... SERVICES Intelligent Transportation Systems Radio Service § 90.350 Scope. The Intelligent Transportation... in the Intelligent Transportation Systems radio service are set forth in this subpart. [64 FR 66410...

  18. 28 CFR 92.7 - Scope.

    Science.gov (United States)

    2010-07-01

    ... Recruitment Program Guidelines § 92.7 Scope. (a) The Police Recruitment program offers funds to qualified... encountering problems throughout the police department application process shall receive counseling, tutorials, and other academic assistance as necessary to assist them in the application process of a police...

  19. 12 CFR 370.1 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Scope. 370.1 Section 370.1 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND STATEMENTS OF GENERAL POLICY TEMPORARY LIQUIDITY..., requirements, and other provisions related to participation in the FDIC's temporary liquidity guarantee program. ...

  20. 49 CFR 591.1 - Scope.

    Science.gov (United States)

    2010-10-01

    ... OF TRANSPORTATION (CONTINUED) IMPORTATION OF VEHICLES AND EQUIPMENT SUBJECT TO FEDERAL SAFETY, BUMPER AND THEFT PREVENTION STANDARDS § 591.1 Scope. This part establishes procedures governing the importation of motor vehicles and motor vehicle equipment subject to the Federal motor vehicle safety, bumper...

  1. 49 CFR 543.1 - Scope.

    Science.gov (United States)

    2010-10-01

    ... OF TRANSPORTATION EXEMPTION FROM VEHICLE THEFT PREVENTION STANDARD § 543.1 Scope. This part establishes procedures under section 605 of the Motor Vehicle Information and Cost Savings Act (15 U.S.C. 2025) for filing and processing petitions to exempt lines of passenger motor vehicles from part 541 of this...

  2. 49 CFR 545.1 - Scope.

    Science.gov (United States)

    2010-10-01

    ... OF TRANSPORTATION FEDERAL MOTOR VEHICLE THEFT PREVENTION STANDARD PHASE-IN AND SMALL-VOLUME LINE REPORTING REQUIREMENTS § 545.1 Scope. This part establishes requirements for manufacturers of motor vehicles..., concerning the number of vehicles that meet the requirements of 49 CFR part 541, and the number of vehicles...

  3. 30 CFR 90.1 - Scope.

    Science.gov (United States)

    2010-07-01

    ... respirable dust sampling for Part 90 miners. This Part 90 is promulgated pursuant to section 101 of the Act... STANDARDS-COAL MINERS WHO HAVE EVIDENCE OF THE DEVELOPMENT OF PNEUMOCONIOSIS General § 90.1 Scope. This Part 90 establishes the option of miners who are employed at underground coal mines or at surface work...

  4. 21 CFR 864.1 - Scope.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Scope. 864.1 Section 864.1 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES HEMATOLOGY AND... hematology and pathology devices intended for human use that are in commercial distribution. (b) The...

  5. The High/Scope Report. Number Four.

    Science.gov (United States)

    Silverman, Charles, Ed.

    This report provides articles on several topics related to the education of young children. In the introduction High/Scope President David P. Weikart suggests that public investment in preschool education is a wise and economically sound social policy. New studies of the long term effects of preschool are demonstrating the staying power of early…

  6. 19 CFR 113.0 - Scope.

    Science.gov (United States)

    2010-04-01

    ... general authority and powers of the Commissioner of Customs in requiring bonds, bond approval and... 19 Customs Duties 1 2010-04-01 2010-04-01 false Scope. 113.0 Section 113.0 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY CUSTOMS BONDS...

  7. Epicurean Meteorology: Sources, method, scope and organization

    NARCIS (Netherlands)

    Bakker, F.A.

    2016-01-01

    In Epicurean Meteorology Frederik Bakker discusses the meteorology as laid out by Epicurus (341-270 BCE) and Lucretius (1st century BCE). Although in scope and organization their ideas are clearly rooted in the Peripatetic tradition, their meteorology sets itself apart from this tradition by its

  8. 14 CFR 77.41 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Scope. 77.41 Section 77.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRSPACE OBJECTS... applies to hearings held by the FAA under titles I, III, and X of the Federal Aviation Act of 1958 (49 U.S...

  9. 31 CFR 203.1 - Scope.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Scope. 203.1 Section 203.1 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE, DEPARTMENT OF THE TREASURY FINANCIAL MANAGEMENT SERVICE PAYMENT OF FEDERAL TAXES AND THE TREASURY TAX AND LOAN PROGRAM...

  10. 12 CFR 725.1 - Scope.

    Science.gov (United States)

    2010-01-01

    ... ADMINISTRATION CENTRAL LIQUIDITY FACILITY § 725.1 Scope. This part contains the regulations implementing the National Credit Union Central Liquidity Facility Act, subchapter III of the Federal Credit Union Act. The National Credit Union Administration Central Liquidity Facility is a mixed-ownership Government corporation...

  11. 45 CFR 73b.1 - Scope.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Scope. 73b.1 Section 73b.1 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION DEBARMENT OR SUSPENSION OF FORMER EMPLOYEES... officer or employee of the Department, including former and retired officers of the commissioned corps of...

  12. Overdiagnosis across medical disciplines : A scoping review

    NARCIS (Netherlands)

    Jenniskens, Kevin; De Groot, Joris A.H.; Reitsma, Johannes B.; Moons, Karel G.M.; Hooft, Lotty; Naaktgeboren, Christiana A.

    2017-01-01

    Objective To provide insight into how and in what clinical fields overdiagnosis is studied and give directions for further applied and methodological research. Design Scoping review. Data sources Medline up to August 2017. Study selection All English studies on humans, in which overdiagnosis was

  13. 15 CFR 990.11 - Scope.

    Science.gov (United States)

    2010-01-01

    ... ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OIL POLLUTION ACT REGULATIONS NATURAL RESOURCE DAMAGE ASSESSMENTS Introduction § 990.11 Scope. The Oil Pollution Act of 1990 (OPA), 33 U.S.C. 2701 et seq., provides for the designation of federal, state, and, if designated by the Governor of the state, local...

  14. Incorporating environmental justice measures during environmental impact statement scoping

    International Nuclear Information System (INIS)

    Imam, J.; Poles, J.S.

    1995-01-01

    Executive Order 12898, open-quote Federal Actions to Address Environmental Justice in Minority Populations and Low-Income populations,close-quote directs Federal agencies to make environmental justice part of their mission by involving minorities and low-income populations and by identifying and addressing as appropriate disproportionately high and adverse human health and environmental effects of their programs, policies, and activities on minority and low-income populations. In the Presidential Memorandum transmitting the Executive Order it was stated that environmental justice should be taken into consideration under the National Environmental Policy Act of 1969 (NEPA). NEPA, with its systematic approach and requirements for alternatives analysis and comprehensive public participation, has served as one of the main mechanisms for involving the public in environmental decision-making. This paper addresses challenges faced by the Department of Energy in involving minority and low-income populations in the public involvement activities associated with a national-level environmental impact statement (EIS) and suggests ways to improve agencies' incorporation of environmental justice considerations in NEPA scoping

  15. Quality assurance of the SCOPE 1 trial in oesophageal radiotherapy.

    Science.gov (United States)

    Wills, Lucy; Maggs, Rhydian; Lewis, Geraint; Jones, Gareth; Nixon, Lisette; Staffurth, John; Crosby, Tom

    2017-11-15

    SCOPE 1 was the first UK based multi-centre trial involving radiotherapy of the oesophagus. A comprehensive radiotherapy trials quality assurance programme was launched with two main aims: 1. To assist centres, where needed, to adapt their radiotherapy techniques in order to achieve protocol compliance and thereby enable their participation in the trial. 2. To support the trial's clinical outcomes by ensuring the consistent planning and delivery of radiotherapy across all participating centres. A detailed information package was provided and centres were required to complete a benchmark case in which the delineated target volumes and organs at risk, dose distribution and completion of a plan assessment form were assessed prior to recruiting patients into the trial. Upon recruiting, the quality assurance (QA) programme continued to monitor the outlining and planning of radiotherapy treatments. Completion of a questionnaire was requested in order to gather information about each centre's equipment and techniques relating to their trial participation and to assess the impact of the trial nationally on standard practice for radiotherapy of the oesophagus. During the trial, advice was available for individual planning issues, and was circulated amongst the SCOPE 1 community in response to common areas of concern using bulletins. 36 centres were supported through QA processes to enable their participation in SCOPE1. We discuss the issues which have arisen throughout this process and present details of the benchmark case solutions, centre questionnaires and on-trial protocol compliance. The range of submitted benchmark case GTV volumes was 29.8-67.8cm 3 ; and PTV volumes 221.9-513.3 cm 3 . For the dose distributions associated with these volumes, the percentage volume of the lungs receiving 20Gy (V20Gy) ranged from 20.4 to 33.5%. Similarly, heart V40Gy ranged from 16.1 to 33.0%. Incidence of incorrect outlining of OAR volumes increased from 50% of centres at benchmark

  16. Reactor vessel decommissioning project. Final report

    International Nuclear Information System (INIS)

    Schoonen, D.H.

    1984-09-01

    This report describes a reactor vessel decommissioning project; it documents and explains the project objectives, scope, performance results, and sodium removal process. The project was successfully completed in FY-1983, within budget and without significant problems or adverse impact on the environment. Waste generated by the operation included the reactor vessel, drained sodium, and liquid, solid, and gaseous wastes which were significantly less than project estimates. Personnel radiation exposures were minimized, such that the project total was one-half the predicted exposure level. Except for the sodium removed, the material remaining in the reactor vessel is essentially the same as when the vessel arrived for processing

  17. Stakeholder Salience in ERP Projects

    OpenAIRE

    Salhotra, Eashan

    2014-01-01

    The aim of this study is to examine stakeholder involvement in an Enterprise Resource Planning (ERP) System project that involves implementation and improvement of the implemented system. The study targets stakeholders, their classification, and their degree of importance during different phases of an ERP project life cycle, i.e. planning, implementation, stabilisation and improvement. The study shows that stakeholder involvement and their salience vary along the ERP project life cycle a...

  18. Adaptively Addressing Uncertainty in Estuarine and Near Coastal Restoration Projects

    Energy Technology Data Exchange (ETDEWEB)

    Thom, Ronald M.; Williams, Greg D.; Borde, Amy B.; Southard, John A.; Sargeant, Susan L.; Woodruff, Dana L.; Laufle, Jeffrey C.; Glasoe, Stuart

    2005-03-01

    Restoration projects have an uncertain outcome because of a lack of information about current site conditions, historical disturbance levels, effects of landscape alterations on site development, unpredictable trajectories or patterns of ecosystem structural development, and many other factors. A poor understanding of the factors that control the development and dynamics of a system, such as hydrology, salinity, wave energies, can also lead to an unintended outcome. Finally, lack of experience in restoring certain types of systems (e.g., rare or very fragile habitats) or systems in highly modified situations (e.g., highly urbanized estuaries) makes project outcomes uncertain. Because of these uncertainties, project costs can rise dramatically in an attempt to come closer to project goals. All of the potential sources of error can be addressed to a certain degree through adaptive management. The first step is admitting that these uncertainties can exist, and addressing as many of the uncertainties with planning and directed research prior to implementing the project. The second step is to evaluate uncertainties through hypothesis-driven experiments during project implementation. The third step is to use the monitoring program to evaluate and adjust the project as needed to improve the probability of the project to reach is goal. The fourth and final step is to use the information gained in the project to improve future projects. A framework that includes a clear goal statement, a conceptual model, and an evaluation framework can help in this adaptive restoration process. Projects and programs vary in their application of adaptive management in restoration, and it is very difficult to be highly prescriptive in applying adaptive management to projects that necessarily vary widely in scope, goal, ecosystem characteristics, and uncertainties. Very large ecosystem restoration programs in the Mississippi River delta (Coastal Wetlands Planning, Protection, and Restoration

  19. Finnsjoen study site. Scope of activities and main results

    International Nuclear Information System (INIS)

    Ahlbom, K.; Andersson, J.E.; Andersson, Peter; Ittner, T.; Tiren, S.; Ljunggren, C.

    1992-12-01

    The Finnsjoen study site was selected in 1977 to provide input to the KBS-1 and KBS-2 performance assessments. The site was later used as a test site for testing new instruments and new site characterization methods, as well as a research site for studying mainly groundwater flow and groundwater transport. All together, the Finnsjoen studies have involved 11 cored boreholes, down to max 700 m depth, and extensive borehole geophysical, geochemical and geohydraulic measurements, as well as rock stress measurements and tracer tests. This report presents the scope of the Finnsjoen studies together with main results. Conceptual uncertainties in assumptions and models are discussed with emphasis on the models used for the performance assessment SKB91. Of special interest for the Finnsjoen study site is the strong influence caused by a subhorizontal fracture zone on groundwater flow, transport and chemistry

  20. 5 CFR 890.1001 - Scope and purpose.

    Science.gov (United States)

    2010-01-01

    ... Providers General Provisions and Definitions § 890.1001 Scope and purpose. (a) Scope. This subpart... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Scope and purpose. 890.1001 Section 890... certain violations. The sanctions include debarment, suspension, civil monetary penalties, and financial...