WorldWideScience

Sample records for project scope includes

  1. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  2. Prioritising Project Scope Definition Elements in Public Building Projects

    Directory of Open Access Journals (Sweden)

    Mohammed K Fageha

    2014-09-01

    Full Text Available A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI as a basis, the study uses analytical network process (ANP technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage. Keywords: Project scope definition, pre-project planning, prioritising, public building projects, Saudi Arabia, Analytical Network Process (ANP

  3. 40 CFR 35.930-4 - Project scope.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Project scope. 35.930-4 Section 35.930... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.930-4 Project scope. The grant agreement must define the scope of the project for which Federal assistance is awarded...

  4. Tank farm restoration and safe operation, Project W-314, upgrade scope summary report (USSR)

    International Nuclear Information System (INIS)

    Gilbert, J.L.

    1998-01-01

    The revision to the Project W-314 Upgrade Scope Summary Report (USSR), incorporates changes to the project scope from customer guidance. Included are incorporation of the recommendations from HNF-2500, agreements regarding interfaces with Project W-211, and assumption of scope previously assigned to Project W-454

  5. Fuzzy decision analysis for project scope change management

    Directory of Open Access Journals (Sweden)

    Farshad Shirazi

    2017-09-01

    Full Text Available It is very important to manage and control projects with the consideration of the triple constraints; namely time, cost and scope. It is also extremely important to manage the scope and all the procurements needed to complete any project. During the project’s lifecycle many changes take place, either positively or negatively, which should be controlled. If the changes are not controlled we may have scope creep that has negative effect on the project. It is commonly considered a negative incident, and thus, should be kept away from the project. By considering this concept, in this paper, we discuss scope change and managing scope and fuzzy analytical hierarchy process is used in selecting the best strategy to manage scope change in projects.

  6. Fuzzy decision analysis for project scope change management

    OpenAIRE

    Farshad Shirazi; Hamed Kazemipoor; Reza Tavakkoli-Moghaddam

    2017-01-01

    It is very important to manage and control projects with the consideration of the triple constraints; namely time, cost and scope. It is also extremely important to manage the scope and all the procurements needed to complete any project. During the project’s lifecycle many changes take place, either positively or negatively, which should be controlled. If the changes are not controlled we may have scope creep that has negative effect on the project. It is commonly considered a negative incid...

  7. IDC Reengineering Phase 2 Project Scope.

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-02-01

    This report provides a brief description of the scope of the IDC Reengineering Phase 2 project. It describes the goals and objectives of reengineering, the system definition, and the technical scope of the system. REVISIONS Version Date Author/Team Revision Description Authorized by 1.0 9/25/2014 SNL IDC Reengineering Team Unlimited Release for I2 M. Harris 1.1 28/01/2015 IDC Reengineering Team Align with previous IDC scope document E. Tomuta.

  8. 40 CFR 93.125 - Enforceability of design concept and scope and project-level mitigation and control measures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Enforceability of design concept and... Transit Laws § 93.125 Enforceability of design concept and scope and project-level mitigation and control... determinations for a transportation plan or TIP and are included in the project design concept and scope which is...

  9. Pre-contract project scoping processes : synthesis of practices.

    Science.gov (United States)

    2016-02-01

    Scoping is the process of developing a projects objectives, need, preliminary cost estimate, and preliminary schedule based on a : recognized need that the project is intended to address. This study (INDOT/JTRP SPR-3944) was launched by the Indian...

  10. Full scope upgrade project for the Fermi 2 simulator

    International Nuclear Information System (INIS)

    Bollacasa, D.; Gonsalves, J.B.; Newcomb, P.C.

    1994-01-01

    The Detroit Edison company (DECO) concentrated the Simulation Division of Asea Brown Boveri (ABB) to perform a full scope upgrade of the Fermi 2 simulator. The Fermi 2 plant is a BWR 6 generation Nuclear Steam Supply System (NSSS). The project included the complete replacement of the existing simulation model sofware with ABB's high fidelity BWR models, addition of an advanced instructor station facility and new simulation computers. Also provided on the project were ABB's advanced simulation environment (CETRAN), a comprehensive configuration management system based on a modern relational database system and a new computer interface to the input/output system. (8 refs., 2 figs.)

  11. Tank farm restoration and safe operation, project W-314, upgrade scope summary report (USSR)

    International Nuclear Information System (INIS)

    Jacobson, R.W.

    1997-01-01

    This revision to the Project W-314 Upgrade Scope Summary Report (USSR), incorporates changes to the project scope from Alternative Generation Analysis (AGA), customer guidance, and changing requirements. It defines the actual upgrades currently in scope, and provides traceability to the requirements and/or drivers

  12. Angra 1 nuclear power plant full scope simulator development project

    Energy Technology Data Exchange (ETDEWEB)

    Selvatici, Edmundo; Castanheira, Luiz Carlos C.; Silva Junior, Nilo Garcia da, E-mail: edsel@eletronuclear.gov.br, E-mail: lccast@eletronuclear.gov.br, E-mail: nilogar@eletronuclear.gov.br [Eletrobras Termonuclear S.A. (SCO/ELETRONUCLEAR), Angra dos Reis, RJ (Brazil). Superintendencia de Coordenacao da Operacao; Zazo, Francisco Javier Lopez; Ruiz, Jose Antonio, E-mail: jlopez@tecnatom.es, E-mail: jaruiz@tecnatom.es [Tecnatom S.A., San Sebastian de los Reyes, Madrid (Spain)

    2015-07-01

    Specific Full Scope Simulators are an essential tool for training NPP control room operators, in the formation phase as well as for maintaining their qualifications. In the last years availability of a Plant specific simulator has also become a Regulator requirement for Nuclear Power Plant operation. By providing real-time practical training for the operators, the use of a simulator allows improving the operator's performance, reducing the number of unplanned shutdowns and more effective response to abnormal and emergency operating conditions. It can also be used, among other uses, to validate procedures, test proposed plant modifications, perform engineering studies and to provide operation training for the technical support staff of the plant. The NPP site, in Angra dos Reis-RJ, Brazil, comprises the two units in operation, Unit 1, 640 MWe, Westinghouse PWR and Unit 2, 1350 MWe, KWU/Areva PWR and one unit in construction, Unit 3, 1405 MWe, KWU/Areva PWR, of the same design of Angra 2. Angra 2 has had its full scope simulator from the beginning, however this was not the case of Angra 1, that had to train its operators abroad, due to lack of a specific simulator. Eletronuclear participated in all the phases of the project, from data supply to commissioning and validation. The Angra 1 full scope simulator encompasses more than 80 systems of the plant including the Primary system, reactor core and associated auxiliary systems, the secondary system and turbo generator as well as all the Plant operational and safety I and C. The Angra 1 Main Control Room panels were reproduced in the simulator control room as well as the remote shutdown panels that are outside the control room. This paper describes the project for development of the Angra 1 NPP Full Scope Simulator, supplied by Tecnatom S.A., in the period of Feb.2012 to Feb.2015. (author)

  13. Angra 1 nuclear power plant full scope simulator development project

    International Nuclear Information System (INIS)

    Selvatici, Edmundo; Castanheira, Luiz Carlos C.; Silva Junior, Nilo Garcia da

    2015-01-01

    Specific Full Scope Simulators are an essential tool for training NPP control room operators, in the formation phase as well as for maintaining their qualifications. In the last years availability of a Plant specific simulator has also become a Regulator requirement for Nuclear Power Plant operation. By providing real-time practical training for the operators, the use of a simulator allows improving the operator's performance, reducing the number of unplanned shutdowns and more effective response to abnormal and emergency operating conditions. It can also be used, among other uses, to validate procedures, test proposed plant modifications, perform engineering studies and to provide operation training for the technical support staff of the plant. The NPP site, in Angra dos Reis-RJ, Brazil, comprises the two units in operation, Unit 1, 640 MWe, Westinghouse PWR and Unit 2, 1350 MWe, KWU/Areva PWR and one unit in construction, Unit 3, 1405 MWe, KWU/Areva PWR, of the same design of Angra 2. Angra 2 has had its full scope simulator from the beginning, however this was not the case of Angra 1, that had to train its operators abroad, due to lack of a specific simulator. Eletronuclear participated in all the phases of the project, from data supply to commissioning and validation. The Angra 1 full scope simulator encompasses more than 80 systems of the plant including the Primary system, reactor core and associated auxiliary systems, the secondary system and turbo generator as well as all the Plant operational and safety I and C. The Angra 1 Main Control Room panels were reproduced in the simulator control room as well as the remote shutdown panels that are outside the control room. This paper describes the project for development of the Angra 1 NPP Full Scope Simulator, supplied by Tecnatom S.A., in the period of Feb.2012 to Feb.2015. (author)

  14. 42 CFR 137.275 - May Self-Governance Tribes include IHS construction programs in a construction project agreement...

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self-Governance Tribes include IHS construction programs in a construction project agreement or in a funding...

  15. Scoping study into community-based renewable energy projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    This scoping study has been carried out by the Centre for Sustainable Energy (CSE), a charity which promotes energy efficiency and renewable energy. CSE have used their involvement in the development of the Energy Club (the first energy service company for householders in the UK) and the Bristol Environment and Energy Trust (a cross-sector organisation initiating environmental projects) as the basis of the study. This study is the first phase of a long term project to set up two small-scale renewable energy schemes to demonstrate the benefits of a community based approach. Specific objectives of the study were: to identify, quantify and cost, renewable energy resources for interested community organisations; to evaluate two routes for developing community based projects - Environment Trusts and Energy Clubs'; to organise a seminar with the objective of bringing together community interest groups with experts in renewable energy; to identify two communities with viable renewable projects for the next phase - full feasibility studies/pilot projects. (author)

  16. Scoping session of the programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    1992-01-01

    This document is about the scoping session which was held at the Community Center in Falls City, Texas. The purpose was to obtain public comment on the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Project (UMTRA), specifically on the ground water project. Presentations made by the manager for the entire UMTRA program, manager of the site and ground water program, comments made by two residents of Fall City are included in this document

  17. Scoping session of the programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Project

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-12-31

    This document is about the scoping session which was held at the Community Center in Falls City, Texas. The purpose was to obtain public comment on the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Project (UMTRA), specifically on the ground water project. Presentations made by the manager for the entire UMTRA program, manager of the site and ground water program, comments made by two residents of Fall City are included in this document.

  18. Scoping a Product Configuration Project for Engineer-to-Order Companies

    DEFF Research Database (Denmark)

    Shafiee, Sara; Hvam, Lars; Bonev, Martin

    2014-01-01

    When implementing a product configuration system in a company making complex and highly engineered products, many decisions need to be made in the early phases of the project. This article presents a framework for supporting the initial scoping process and discusses experiences from applying...

  19. How to Scope a Product Configuration Project in an Engineering Company

    DEFF Research Database (Denmark)

    Shafiee, Sara; Hvam, Lars; Bonev, Martin

    2014-01-01

    When implementing a product configuration system in a company making complex and highly engineered products, many decisions need to be made in the early phases of the project. This article presents a framework for supporting the initial scoping process and discusses experiences from applying...... the framework in an engineering company. The framework covers a number of topics, such as identifying the users of the configuration system, prioritizing the user requirements, defining the input and output, and the overall functionality of the configuration system. Furthermore, the scoping process considers...

  20. Scoping key soil issues for the Suncor Voyageur Oil Sands Project EIA

    Energy Technology Data Exchange (ETDEWEB)

    Doram, D.; Gulley, J. [Golder Associates, Calgary, AB (Canada); Fordham, C. [Suncor Energy, Calgary, AB (Canada)

    2002-07-01

    An issue scoping process to focus the soil impact assessment undertaken in conjunction with Suncor Energy's Voyageur Project near Fort McMurray, Alberta, is described. Potential impacts to soils considered include disturbances from mining and in-situ developments, re-constructing soils to meet equivalent capability and predicting how soils will respond to acid deposition. The assessment also provides an opportunity to evaluate unique soil mitigation strategies at both the local and regional levels. New regulatory and soil reclamation challenges include developing soil salvage criteria for restoring the biodiversity which existed prior to the disturbance necessitated by the mining and in-situ operations and creating a suitable habitat for the caribou in the Firebag lease.

  1. 42 CFR 67.10 - Purpose and scope.

    Science.gov (United States)

    2010-10-01

    ... and procedures; projects to improve methods and data bases for outcomes, effectiveness, and other... Research, Evaluation, Demonstration, and Dissemination Projects § 67.10 Purpose and scope. The regulations... projects, including conferences, on health care services and systems for the delivery of such services, as...

  2. Brief introduction to project management of full scope simulator for Qinshan 300 MW Nuclear Power Unit

    International Nuclear Information System (INIS)

    Chen Jie

    1996-01-01

    The key points in development and engineering project management of full scope simulator for Qinshan 300 MW Nuclear Power Unit are briefly introduced. The Gantt chart, some project management methods and experience are presented. The key points analysis along with the project procedure will be useful to the similar project

  3. Expanding Pharmacists' Scope of Practice to Include Immunization in Nova Scotia

    Directory of Open Access Journals (Sweden)

    Beth O'Reilly

    2017-07-01

    Full Text Available On 10 December 2010 An Act to Amend Chapter 36 of the Acts of 2001, the Pharmacy Act (Bill 7 received Royal Assent in Nova Scotia, including an amendment that enabled an expanded scope of pharmacy practice. Expanding pharmacists' scope of practice came about from recommendations by various federal and provincial government bodies as an attempt to improve accessibility to health care and decrease costs. In 2013, pharmacists in Nova Scotia began administering the influenza vaccine as part of the publicly funded program in attempts to improve vaccine coverage rates. Preliminary evaluation in Nova Scotia has shown an increase in influenza vaccination coverage. Although pharmacist administration of influenza vaccination may improve vaccination coverage and reduce demand on physician time, there may be tension created among the professions, which needs to be addressed and managed.

  4. 75 FR 11169 - Reedsport OPT Wave Park Project; Reedsport OPT Wave Park; LLC Notice of Scoping Meetings and...

    Science.gov (United States)

    2010-03-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12713-002] Reedsport OPT Wave Park Project; Reedsport OPT Wave Park; LLC Notice of Scoping Meetings and Environmental Site...: Reedsport OPT Wave Park, LLC. e. Name of Project: Reedsport OPT Wave Park Project. [[Page 11170

  5. Project scoping for lessons learnt to apply to the Celtic Seas marine sub-region

    OpenAIRE

    Twomey, Sarah; O'Mahony, Cathal

    2013-01-01

    This report involves a formal scoping exercise to identify lessons from a wide range of previous and current project and initiative experiences at the national, regional seas, European and global levels. An inventory of 77 projects and initiatives that are relevant with regard to the key activities proposed by the Celtic Seas Partnership has been compiled, as well as a short-list of 23 of the most pertinent projects, lessons learnt and contact names. This report has identified a number of syn...

  6. Puget Sound Reinforcement Project : Planning for Peak Power Needs : Scoping Report, Part A, Summary of Public Comments.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1990-07-01

    This report summarizes public participation in the environmental scoping process for the Puget Sound Reinforcement Project, a Bonneville Power Administration (BPA) and Puget Sound area utilities study of voltage stability in northwestern Washington state. The environmental scoping phase of the Puget Sound project consisted of a series of public meetings and a public comment period. The content of these meetings is summarized in 2.0, Public Involvement. In 3.0, Comment Summary, the report summarizes comments received via meetings, mail and phone. The report ends with a description of the next steps in the project. Chapter 4.0, describes the decision process to be used by BPA and area utilities. Chapter 5.0 describes opportunities for public participation in decisions to be made about the future reliability of Puget Sound's electricity supply.

  7. Comprehensive Summary and Analysis of Oral and Written Scoping Comments on the Hawaii Geothermal Project EIS (DOE Review Draft)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-09-18

    This report contains summaries of the oral and written comments received during the scoping process for the Hawaii Geothermal Project (HGP) Environmental Impact Statement (EIS). Oral comments were presented during public scoping meetings; written comments were solicited at the public scoping meetings and in the ''Advance Notice of Intent'' and ''Notice of Intent'' (published in the ''Federal Register'') to prepare the HGP EIS. This comprehensive summary of scoping inputs provides an overview of the issues that have been suggested for inclusion in the HGP EIS.

  8. Determining Teachers' Educational Needs Regarding School Education Projects within the Scope of Erasmus+ Programme

    Science.gov (United States)

    Karakus, Fatma; Uyar, Melis Yesilpinar; Balbag, Nur Leman

    2017-01-01

    The purpose of this study was to determine teachers' educational needs regarding school education projects within the scope of Erasmus+ programme. In the study, the case study method, one of qualitative research designs, was used. The participants were determined using the snowball sampling method, and eight secondary school teachers took part in…

  9. JPL Year 2000 Project. A Project Manager's Observations: Y2k

    Science.gov (United States)

    Mathison, Richard P. (Technical Monitor)

    1999-01-01

    This paper presents observations from a project manager on the Y2K problem. The topics include: 1) Agenda: 2) Scope; 3) Project Organization; 4) The Fixes; 5) The Toughest Part; 6) Validation versus Time; and 7) Information Sources. This paper is in viewgraph form.

  10. 10 CFR 715.1 - Purpose and scope.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Purpose and scope. 715.1 Section 715.1 Energy DEPARTMENT OF ENERGY DEFINITION OF NON-RECOURSE PROJECT-FINANCED § 715.1 Purpose and scope. This part sets forth the definition of “nonrecourse project-financed” as that term is used to define “new independent power...

  11. The Use of Tablets Distributed within the Scope of FATIH Project for Education in Turkey (Is FATIH Project a Fiasco or a Technological Revolution?)

    Science.gov (United States)

    Isci, Tugce Gamze; Demir, Selcuk Besir

    2015-01-01

    This study aims to profoundly investigate the usage of tablets distributed within the scope of FATIH Project in Turkey in terms of teacher views. The study was conducted with case study design, which is one of the qualitative study methods. The participants in the study were determined using critical case sampling. Data was collected using…

  12. Scoping of flood hazard mapping needs for Cumberland County, Maine

    Science.gov (United States)

    Dudley, Robert W.; Schalk, Charles W.

    2006-01-01

    watersheds, and the characteristics of the watersheds have changed with time. Therefore, many of the older studies may not depict current conditions nor accurately estimate risk in terms of flood heights. The following is the scope of work as defined in the FEMA/USGS Statement of Work: Task 1: Collect data from a variety of sources including community surveys, other Federal and State Agencies, National Flood Insurance Program (NFIP) State Coordinators, Community Assistance Visits (CAVs) and FEMA archives. Lists of mapping needs will be obtained from the MNUSS database, community surveys, and CAVs, if available. FEMA archives will be inventoried for effective FIRM panels, FIS reports, and other flood-hazard data or existing study data. Best available base map information, topographic data, flood-hazard data, and hydrologic and hydraulic data will be identified. Data from the Maine Floodplain Management Program database also will be utilized. Task 2: Contact communities in Cumberland County to notify them that FEMA and the State have selected them for a map update, and that a project scope will be developed with their input. Topics to be reviewed with the communities include (1) Purpose of the Flood Map Project (for example, the update needs that have prompted the map update); (2) The community's mapping needs; (3) The community's available mapping, hydrologic, hydraulic, and flooding information; (4) target schedule for completing the project; and (5) The community's engineering, planning, and geographic information system (GIS) capabilities. On the basis of the collected information from Task 1 and community contacts/meetings in Task 2, the USGS will develop a Draft Project Scope for the identified mapping needs of the communities in Cumberland County. The following items will be addressed in the Draft Project Scope: review of available information, determine if and how effective FIS data can be used in new project, and identify other data needed to

  13. Scoping of flood hazard mapping needs for Kennebec County, Maine

    Science.gov (United States)

    Dudley, Robert W.; Schalk, Charles W.

    2006-01-01

    . However, in the ensuing 20-30 years, development has occurred in many of the watersheds, and the characteristics of the watersheds have changed with time. Therefore, many of the older studies may not depict current conditions nor accurately estimate risk in terms of flood heights. The following is the scope of work as defined in the FEMA/USGS Statement of Work: Task 1: Collect data from a variety of sources including community surveys, other Federal and State Agencies, National Flood Insurance Program (NFIP) State Coordinators, Community Assistance Visits (CAVs) and FEMA archives. Lists of mapping needs will be obtained from the MNUSS database, community surveys, and CAVs, if available. FEMA archives will be inventoried for effective FIRM panels, FIS reports, and other flood-hazard data or existing study data. Best available base map information, topographic data, flood-hazard data, and hydrologic and hydraulic data will be identified. Data from the Maine Floodplain Management Program database also will be utilized. Task 2: Contact communities in Kennebec County to notify them that FEMA and the State have selected them for a map update, and that a project scope will be developed with their input. Topics to be reviewed with the communities include (1) Purpose of the Flood Map Project (for example, the update needs that have prompted the map update); (2) The community's mapping needs; (3) The community's available mapping, hydrologic, hydraulic, and flooding information; (4) target schedule for completing the project; and (5) The community's engineering, planning, and geographic information system (GIS) capabilities. On the basis of the collected information from Task 1 and community contacts/meetings in Task 2, the USGS will develop a Draft Project Scope for the identified mapping needs of the communities in Kennebec County. The following items will be addressed in the Draft Project Scope: review of available information, determine if and how e

  14. Scoping of flood hazard mapping needs for Somerset County, Maine

    Science.gov (United States)

    Dudley, Robert W.; Schalk, Charles W.

    2006-01-01

    s. However, in the ensuing 20-30 years, development has occurred in many of the watersheds, and the characteristics of the watersheds have changed with time. Therefore, many of the older studies may not depict current conditions nor accurately estimate risk in terms of flood heights. The following is the scope of work as defined in the FEMA/USGS Statement of Work: Task 1: Collect data from a variety of sources including community surveys, other Federal and State Agencies, National Flood Insurance Program (NFIP) State Coordinators, Community Assistance Visits (CAVs) and FEMA archives. Lists of mapping needs will be obtained from the MNUSS database, community surveys, and CAVs, if available. FEMA archives will be inventoried for effective FIRM panels, FIS reports, and other flood-hazard data or existing study data. Best available base map information, topographic data, flood-hazard data, and hydrologic and hydraulic data will be identified. Data from the Maine Floodplain Management Program database also will be utilized. Task 2: Contact communities in Somerset County to notify them that FEMA and the State have selected them for a map update, and that a project scope will be developed with their input. Topics to be reviewed with the communities include (1) Purpose of the Flood Map Project (for example, the update needs that have prompted the map update); (2) The community's mapping needs; (3) The community's available mapping, hydrologic, hydraulic, and flooding information; (4) target schedule for completing the project; and (5) The community's engineering, planning, and geographic information system (GIS) capabilities. On the basis of the collected information from Task 1 and community contacts/meetings in Task 2, the USGS will develop a Draft Project Scope for the identified mapping needs of the communities in Somerset County. The following items will be addressed in the Draft Project Scope: review of available information, determine if and ho

  15. Project specific quality assurance plan for Project W-178, 219-S secondary containment

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The scope of this Quality Assurance Program Plan (QAPP) is to provide a system of Quality Assurance reviews and verifications on the design, procurement and construction of the 219-S Secondary Containment Upgrade. The reviews and verifications will be on activities associated with design, procurement, and construction of the Secondary Containment Upgrade which includes, but is not limited to demolition, removal, new tank installation, tank 103 isolation, tank cell refurbishment, electrical, instrumentation, piping/tubing including supports, pump and valves, and special coatings. The full project scope is defined in the project Functional Design Criteria (FDC), SD-W178-FDC-001, and all activities must be in compliance with this FDC and related design documentation

  16. Scope selection and control

    International Nuclear Information System (INIS)

    Guglielmi, F.

    2011-01-01

    OPG is preparing for a 4-unit refurbishment program at Darlington later in this decade. Key efforts underway include the selection of the right refurbishment scope that will allow Darlington to achieve top-decile performance post-refurbishment. For this to be possible, it is imperative that (1) plant/equipment condition be well understood, (2) post-refurbishment performance objectives be clearly defined, and (3) regulatory and other risks be carefully assessed and mitigated. Significant engineering, operations and maintenance support is required to complete this phase of the project cycle.

  17. 42 CFR 137.327 - May multiple projects be included in a single construction project agreement?

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May multiple projects be included in a single construction project agreement? 137.327 Section 137.327 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.327 May multiple projects be included in a single...

  18. 76 FR 51022 - Juneau Hydropower, Inc.; Notice of Scoping Meeting and Site Visit and Soliciting Scoping Comments...

    Science.gov (United States)

    2011-08-17

    ... Hydropower, Inc.; Notice of Scoping Meeting and Site Visit and Soliciting Scoping Comments for an Applicant...: Alternative Licensing Process. b. Project No.: 13563-001. c. Applicant: Juneau Hydropower, Inc. d. Name of... Mitchell, Business Manager, Juneau Hydropower, Inc., P.O. Box 22775, Juneau, AK 99802; 907-789-2775, e...

  19. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  20. Scope Management of Non-Functional Requirements

    NARCIS (Netherlands)

    Kassab, M.; Daneva, Maia; Ormandjieva, O.; Mueller, P.; Lyggesmeyer, P.; Maehle, E.

    2007-01-01

    In order to meet commitments in software projects, a realistic assessment must be made of project scope. Such an assessment relies on the availability of knowledge on the user-defined project requirements and their effort estimates and priorities, as well as their risk. This knowledge enables

  1. Project Interface Requirements Process Including Shuttle Lessons Learned

    Science.gov (United States)

    Bauch, Garland T.

    2010-01-01

    Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings

  2. 42 CFR 403.200 - Basis and scope.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Basis and scope. 403.200 Section 403.200 Public... PROVISIONS SPECIAL PROGRAMS AND PROJECTS Medicare Supplemental Policies § 403.200 Basis and scope. (a... intent of that section is to enable Medicare beneficiaries to identify Medicare supplemental policies...

  3. Hanford Waste Vitrification Project Building limited scope risk assessment

    International Nuclear Information System (INIS)

    Braun, D.J.; Lindberg, S.E.; Reardon, M.F.; Wilson, G.P.

    1992-10-01

    A limited scope risk assessment was performed on the preliminary design of a high-level waste interim storage facility. The Canister Storage Building (CSB) facility will be built to support remediation at the US Department of Energy Hanford Site in Washington State. The CSB will be part of the support facilities for a high level Hanford Waste Vitrification Plant (HWVP). The limited scope risk assessment is based on a preliminary design which uses forced air circulation systems to move air through the building vault. The current building design calls for natural circulation to move air through the building vault

  4. EarthScope Education and Outreach: Accomplishments and Emerging Opportunities

    Science.gov (United States)

    Robinson, S.; Ellins, K. K.; Semken, S. C.; Arrowsmith, R.

    2014-12-01

    EarthScope's Education and Outreach (E&O) program aims to increase public awareness of Earth science and enhance geoscience education at the K-12 and college level. The program is distinctive among major geoscience programs in two ways. First, planning for education and public engagement occurred in tandem with planning for the science mission. Second, the NSF EarthScope program includes funding support for education and outreach. In this presentation, we highlight key examples of the program's accomplishments and identify emerging E&O opportunities. E&O efforts have been collaboratively led by the EarthScope National Office (ESNO), IRIS, UNAVCO, the EarthScope Education and Outreach Subcommittee (EEOSC) and PI-driven EarthScope projects. Efforts by the EEOSC, guided by an EarthScope Education and Outreach Implementation Plan that is periodically updated, focus EarthScope E&O. EarthScope demonstrated early success in engaging undergraduate students (and teachers) in its mission through their involvement in siting USArray across the contiguous U.S. Funded E&O programs such as TOTLE, Illinois EarthScope, CEETEP (for K-12), InTeGrate and GETSI (for undergraduates) foster use of freely available EarthScope data and research findings. The Next Generation Science Standards, which stress science and engineering practices, offer an opportunity for alignment with existing EarthScope K-12 educational resources, and the EEOSC recommends focusing efforts on this task. The EEOSC recognizes the rapidly growing use of mobile smart devices by the public and in formal classrooms, which bring new opportunities to connect with the public and students. This will capitalize on EarthScope's already prominent social media presence, an effort that developed to accomplish one of the primary goals of the EarthScope E&O Implementation Plan to "Create a high-profile public identity for EarthScope" and to "Promote science literacy and understanding of EarthScope among all audiences through

  5. Work Scope for Developing Standards for Emergency Preparedness and Response: Fiscal Year 2004 Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Stenner, Robert D.

    2005-09-28

    Summarizes the fiscal year 2004 work completed on PNNL's Department of Homeland Security Emergency Preparedness and Response Standards Development Project. Also, the report includes key draft standards, in various stages of development and publication, that were associated with various tasks of the fiscal year 2004 scope of the project.

  6. Technical program plan, Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    1979-12-01

    The Basalt Waste Isolation Project (BWIP) program as administered by the DOE's Richland Operations Office and Rockwell Hanford Operations is described. The objectives, scope and scientific technologies are discussed. The work breakdown structure of the project includes: project management and support, systems integration, geosciences, hydrology, engineered barriers, test facility design and construction, engineering testing, repository studies, and schedules. The budget of the program including operating and capital cost control is also included

  7. Project Design Concept for Monitoring and Control System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations

  8. 7 CFR 634.1 - Purpose and scope.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Purpose and scope. 634.1 Section 634.1 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM General § 634.1 Purpose and scope. (a) The purpose... from agricultural activities. The proposed project area must be within a high priority area in an...

  9. California Energy Commission Public Interest EnergyResearch/Energy System Integration -- Transmission-Planning Research&Development Scoping Project

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

    2004-07-01

    The objective of this Public Interest Energy Research (PIER)scoping project is to identify options for public-interest research and development (R&D) to improve transmission-planning tools, techniques, and methods. The information presented was gathered through a review of current California utility, California Independent System Operator (ISO), and related western states electricity transmission-planning activities and emerging needs. This report presents the project teams findings organized under six topic areas and identifies 17 distinct R&D activities to improve transmission-planning in California and the West. The findings in this report are intended for use, along with other materials, by PIER staff, to facilitate discussions with stakeholders that will ultimately lead to development of a portfolio of transmission-planning R&D activities for the PIER program.

  10. Constrained bayesian inference of project performance models

    OpenAIRE

    Sunmola, Funlade

    2013-01-01

    Project performance models play an important role in the management of project success. When used for monitoring projects, they can offer predictive ability such as indications of possible delivery problems. Approaches for monitoring project performance relies on available project information including restrictions imposed on the project, particularly the constraints of cost, quality, scope and time. We study in this paper a Bayesian inference methodology for project performance modelling in ...

  11. The Hel Peninsula – Smart Grid Pilot Project

    Directory of Open Access Journals (Sweden)

    Sławomir Noske

    2014-12-01

    Full Text Available The paper presents the scope and results of engineering, and the scope of Smart Grid deployment in the Hel Peninsula. The following functionalities will be described: Fault Detection, Isolation & Recovery – FDIR function, Integrated Volt/Var Control (IVVC function, advanced supervision of LV grid, including distributed energy resources. The paper contains implementation results and research findings, as well as preliminary cost-benefit analysis of the project. Moreover, since Smart Metering and Smart Grid projects are being deployed in the same region – the Hel Peninisula – the benefit achieved by merging the two projects will be explained.

  12. U.S. Department of Energy Uranium Mill Tailings Remedial Action Ground Water Project: Project plan

    International Nuclear Information System (INIS)

    1994-09-01

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA Project processing sites. The compliance strategy for the processing sites must satisfy the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1987). This scope of work will entail the following activities on a site-specific basis: Develop a compliance strategy based on modification of the UMTRA Surface Project RAPs or develop Ground Water Project RAPs with NRC concurrence on the RAP and full participation of the affected states and tribes. Implement the RAP to include institutional controls, where appropriate, as an interim measure until compliance with the standards is achieved. Institute long-term verification monitoring for transfer to a separate long-term surveillance program on or before the Project end date. Prepare certification or confirmation reports and modify the long-term surveillance plan (LTSP), where needed, on those sites completed prior to the Project end date

  13. REBUILD AMERICA PROGRAM SCOPE OF WORK

    Energy Technology Data Exchange (ETDEWEB)

    Jeffrey Brown; Bruce Exstrum

    2004-12-01

    This report summarizes the activities carried out by Aspen Systems Corporation in support of the Department of Energy's Rebuild America program during the period from October 9, 1999 to October 31, 2004. These activities were in accordance with the Scope of Work contained in a GSA MOBIS schedule task order issued by the National Energy Technology Laboratory. This report includes descriptions of activities and results in the following areas: deployment/delivery model; program and project results; program representative support activities; technical assistance; web site development and operation; business/strategic partners; and training/workshop activities. The report includes conclusions and recommendations. Five source documents are also provided as appendices.

  14. FedScope Employment Cubes

    Data.gov (United States)

    Office of Personnel Management — This raw data set provides Federal civilian employee population data. The scope of this raw data set includes all data elements used in the creation of the FedScope...

  15. FLEXIBLE SCOPE IN ACCREDITATION - INTRODUCING VAGUENESS OR BETTER EXPRESSION OF SCOPE

    Directory of Open Access Journals (Sweden)

    Miloš Jelić

    2007-09-01

    Full Text Available Historically, laboratory accreditation has been grounded on fixed scope of accreditation to establish precisely and unambiguously the range of tests and calibrations covered by a granted accreditation. By the time elapsed it was noticed that such approach sometimes appears to be restrictive since it constrains new or modified methods to be added to a laboratory's scope, even where competence in this general area has already been demonstrated. Accreditation of a flexible scope places more of the responsibility onto the laboratory itself because it imposes to the laboratory to establish and maintain management system that can control its proposed approach. Flexible scope of accreditation yields benefit to all accreditation stakeholders but, on the other hand, introduces more requiring interpretations of relevant standard clauses and includes the bounds of the scope which are defined in more distinct way.

  16. A MILP for multi-machine injection moulding sequencing in the scope of C2NET Project

    Directory of Open Access Journals (Sweden)

    Beatriz Andrés

    2018-01-01

    Full Text Available The goal of C2NET European H2020 Funded Project is the creation of cloud-enabled tools for supporting the SMEs supply network optimization of manufacturing and logistic assets based on collaborative demand, production and delivery plans. In the scope of C2NET Project, and particularly in the Optimisation module (C2NET OPT, this paper proposes a novel holistic mixed integer linear programing (MILP model to optimise the injection sequencing in a multi-machine case. The results of the MILP will support the production planner decision-making process in the calculation of (i moulds setup in certain machines, and (ii the amount of products to produce in order to minimise the setup, inventory, and backorders costs. The designed MILP takes part of the algorithms repository created in C2NET European Funded Project to solve realistic industry planning problems. The MILP is verified in realistic data considering three data sets with different sizes, in order to test it’s the computation efficiency.

  17. Scope of work-supplemental standards-related fieldwork - Salt Lake City UMTRA Project Site, Salt Lake City, Utah

    International Nuclear Information System (INIS)

    1996-01-01

    This scope of work governs the field effort to conduct transient in situ (hereafter referred to by the trademark name HydroPunch reg-sign) investigative subsurface logging and ground water sampling, and perform well point installation services at the U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Salt Lake City, Utah. The HydroPunch reg-sign and well point services subcontractor (the Subcontractor) shall provide services as stated herein to be used to investigate the subsurface, collect and analyze ground water samples, and install shallow well points

  18. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  19. 75 FR 16456 - Inglis Hydropower, LLC; Notice Soliciting Scoping Comments

    Science.gov (United States)

    2010-04-01

    ... Hydropower, LLC; Notice Soliciting Scoping Comments March 26, 2010. Take notice that the following...: Inglis Hydropower, LLC. e. Name of Project: Inglis Hydropower Project. f. Location: The proposed project... Commission staff intends to prepare a single Environmental Assessment (EA) for the Inglis Hydropower Project...

  20. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  1. CMS Phase II Upgrade Scope Document

    CERN Document Server

    Butler, J; Klute, M; Mans, J; Silvestris, L; on behalf of the CMS, Collaboration; CERN. Geneva. The LHC experiments Committee; LHCC

    2015-01-01

    The High-Luminosity LHC (HL-LHC) has been identified as the highest priority program in High Energy Physics by both the European Strategy Group and the US Particle Physics Project Prioritization Panel. To fulfil the full potential of this program, which includes the study of the nature of the Higgs boson, the investigation of the properties of any newly discovered particles in the upcoming LHC runs, and the extension of the mass reach for further discoveries, an integrated luminosity of 3000 fb-1 will have to be accumulated by the end of the program. In preparation for operation at the HL-LHC , CMS has documented the necessary upgrades and their expected costs in a Technical Proposal submitted to the CERN LHC Committee (LHCC) in mid-2015. The material presented in the current “Scope Document” provides additional information to assist the LHCC and the CERN Resource Review Board (RRB) in their review of the CMS upgrade. The document commences with a summary of the process followed to develop the scope of t...

  2. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  3. Baseline review of the U.S. LHC Accelerator project

    International Nuclear Information System (INIS)

    1998-02-01

    The Department of Energy (DOE) Review of the U.S. Large Hadron Collider (LHC) Accelerator project was conducted February 23--26, 1998, at the request of Dr. John R. O'Fallon, Director, Division of High Energy Physics, Office of Energy Research, U.S. DOE. This is the first review of the U.S. LHC Accelerator project. Overall, the Committee found that the U.S. LHC Accelerator project effort is off to a good start and that the proposed scope is very conservative for the funding available. The Committee recommends that the project be initially baselined at a total cost of $110 million, with a scheduled completion data of 2005. The U.S. LHC Accelerator project will supply high technology superconducting magnets for the interaction regions (IRs) and the radio frequency (rf) straight section of the LHC intersecting storage rings. In addition, the project provides the cryogenic support interface boxes to service the magnets and radiation absorbers to protect the IR dipoles and the inner triplet quadrupoles. US scientists will provide support in analyzing some of the detailed aspects of accelerator physics in the two rings. The three laboratories participating in this project are Brookhaven National Laboratory, Fermi National Accelerator Laboratory (Fermilab), and Lawrence Berkeley National Laboratory. The Committee was very impressed by the technical capabilities of the US LHC Accelerator project team. Cost estimates for each subsystem of the US LHC Accelerator project were presented to the Review Committee, with a total cost including contingency of $110 million (then year dollars). The cost estimates were deemed to be conservative. A re-examination of the funding profile, costs, and schedules on a centralized project basis should lead to an increased list of deliverables. The Committee concluded that the proposed scope of US deliverables to CERN can be readily accomplished with the $110 million total cost baseline for the project. The current deliverables should serve as

  4. Department of Energy Programmatic Environmental Impact Statement (PEIS) scoping session

    International Nuclear Information System (INIS)

    1992-01-01

    The purpose of this programmatic environmental impact statement (PEIS) scoping meeting was: to present the ground water program so as to build some familiarity and understanding about the issue involved; and to get the Durango community's input. This report contains the presentations made by the project manager for the uranium mill tailings program, site manager for the Durango UMTRA site, manager of ground water hydrology, and includes comments made by local residents

  5. Tank waste remediation system privatization Phase 1 infrastructure, project W-519, project execution plan

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented

  6. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  7. All about High/Scope: Practical Summaries of High/Scope's History, Educational Approach, and Curriculum. Numbers 1-10.

    Science.gov (United States)

    Epstein, Ann S.

    This document is comprised of 10 High/Scope fact sheets for parents, detailing the history of the High/Scope educational approach and describing its educational practice and curriculum. The major topic for each four-page fact sheet follows: (1) educational approach, including goals for young children and features of the High/Scope approach to…

  8. Qinshan 300Mwe NPP full scope simulator upgrade

    International Nuclear Information System (INIS)

    Qi Kelin; Li Qing; Liu Wei, Lai Shengyuan

    2006-01-01

    On April 28,2004, RINPO was awarded the project for Qinshan 300Mwe NPP full scope simulator upgrade, the SAT (site acceptance test) was completed on June 30 2005 and the simulator put into operator training again. Scope of upgrade includes: computer system (DGI server and workstations) all replaced by microcomputers; G2 I/O controllers all replaced by RTP EIOBC; Unix-based simulation support environment replaced by RINPO's PC-based simulation environment RINSIMTM, Instructor software replaced by RINPO's PC-based instructor software with function and diagram redesigned; DEH, Feed-water control and some other digital control systems redeveloped to follow NPP modifications; desk-top simulator with soft panel control room developed as byproduct; most of the models not changed but it is planned the reactor core and PPC model will be upgraded in near future. SAT of upgrade demonstrates that the performance of the simulator much improved after the upgrade. (author)

  9. 5 CFR 890.1001 - Scope and purpose.

    Science.gov (United States)

    2010-01-01

    ... Providers General Provisions and Definitions § 890.1001 Scope and purpose. (a) Scope. This subpart... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Scope and purpose. 890.1001 Section 890... certain violations. The sanctions include debarment, suspension, civil monetary penalties, and financial...

  10. Medical Oversight, Educational Core Content, and Proposed Scopes of Practice of Wilderness EMS Providers: A Joint Project Developed by Wilderness EMS Educators, Medical Directors, and Regulators Using a Delphi Approach.

    Science.gov (United States)

    Millin, Michael G; Johnson, David E; Schimelpfenig, Tod; Conover, Keith; Sholl, Matthew; Busko, Jonnathan; Alter, Rachael; Smith, Will; Symonds, Jennifer; Taillac, Peter; Hawkins, Seth C

    2017-01-01

    A disparity exists between the skills needed to manage patients in wilderness EMS environments and the scopes of practice that are traditionally approved by state EMS regulators. In response, the National Association of EMS Physicians Wilderness EMS Committee led a project to define the educational core content supporting scopes of practice of wilderness EMS providers and the conditions when wilderness EMS providers should be required to have medical oversight. Using a Delphi process, a group of experts in wilderness EMS, representing educators, medical directors, and regulators, developed model educational core content. This core content is a foundation for wilderness EMS provider scopes of practice and builds on both the National EMS Education Standards and the National EMS Scope of Practice Model. These experts also identified the conditions when oversight is needed for wilderness EMS providers. By consensus, this group of experts identified the educational core content for four unique levels of wilderness EMS providers: Wilderness Emergency Medical Responder (WEMR), Wilderness Emergency Medical Technician (WEMT), Wilderness Advanced Emergency Medical Technician (WAEMT), and Wilderness Paramedic (WParamedic). These levels include specialized skills and techniques pertinent to the operational environment. The skills and techniques increase in complexity with more advanced certification levels, and address the unique circumstances of providing care to patients in the wilderness environment. Furthermore, this group identified that providers having a defined duty to act should be functioning with medical oversight. This group of experts defined the educational core content supporting the specific scopes of practice that each certification level of wilderness EMS provider should have when providing patient care in the wilderness setting. Wilderness EMS providers are, indeed, providing health care and should thus function within defined scopes of practice and with

  11. Conclusions and recommendations of the SCOPE-RADSITE workshop on remediation achievements after uranium mining and milling

    International Nuclear Information System (INIS)

    Vandenhove, H.; Vandecasteele, C.M.; Collard, G.

    2002-01-01

    The SCOPE-RADSITE Project provides a unique international scientific forum where the radioactive wastes generated in the development of nuclear weapons, including their potential impact on the environment and human populations, are studied and reviewed. At the present SCOPE-RADSITE workshop a team of experts presented the current status of uranium mining and milling operations in the United States, in the former Soviet Union (FSU) and in Central and Eastern Europe. The effect of radiocontaminants resulting from the uranium mining and milling operations to species other than humans and the combined effects of environmental radiation and other agents were discussed. Finally, three cases of remediation projects were presented: remediation at COGEMA sites in France, the WISMUT rehabilitation project in Germany and uranium mine reclamation in Texas and remediation achievements were described. Finally the workshop discussed important issues and recommendations to be considered when approaching remediation of past legacies resulting from uranium mining and milling. (author)

  12. The ComSoc guide to managing telecommunications projects

    CERN Document Server

    Desmond, Celia

    2010-01-01

    "This pocket guide provides an overview of the telecommunications environment as it has evolved over the past few years, illustrating the need for project management, the significance of project success to the companies, and the application of key project management processes within the telecom environment. Topics covered include: scope management, time management, cost management, procurement management, risk management, communications, quality, human resources, and Integration. It offers professionals a brief and accessible guide to managing telecommunication projects in the 21st century"--

  13. Proposal for the extension of a partner project agreement with ISTC ? ATLAS collaboration

    CERN Document Server

    2000-01-01

    This document concerns the extension of the scope of work covered by a partner project agreement with the ISTC, namely Partner Project Agreement 1800p for Manufacturing, Assembly and Testing of the End-cap Transition Radiation Tracker (TRT) for the ATLAS Experiment at the CERN LHC. This Partner Project Agreement was approved by Council on 23 June 2000 (c.f. draft minutes of the meeting CERN/2340/Draft). For reasons set out in this document the Finance Committee is invited to approve the extension of the scope of work covered by Partner Project Agreement 1800p to include the Manufacturing, Assembly and Testing of type C End-cap support rings for a total amount of 503 720 Swiss francs.

  14. 78 FR 68044 - Erie Boulevard Hydropower, L.P.; Notice of Scoping Meetings and Environmental Site Review and...

    Science.gov (United States)

    2013-11-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7320-042] Erie Boulevard Hydropower, L.P.; Notice of Scoping Meetings and Environmental Site Review and Soliciting Scoping Comments.... Date filed: July 1, 2013. d. Applicant: Erie Boulevard Hydropower, L.P. e. Name of Project: Chasm...

  15. Reactor vessel decommissioning project. Final report

    International Nuclear Information System (INIS)

    Schoonen, D.H.

    1984-09-01

    This report describes a reactor vessel decommissioning project; it documents and explains the project objectives, scope, performance results, and sodium removal process. The project was successfully completed in FY-1983, within budget and without significant problems or adverse impact on the environment. Waste generated by the operation included the reactor vessel, drained sodium, and liquid, solid, and gaseous wastes which were significantly less than project estimates. Personnel radiation exposures were minimized, such that the project total was one-half the predicted exposure level. Except for the sodium removed, the material remaining in the reactor vessel is essentially the same as when the vessel arrived for processing

  16. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  17. High Temperature Gas-cooled Reactor Projected Markets and Scoping Economics

    Energy Technology Data Exchange (ETDEWEB)

    Larry Demick

    2010-08-01

    The NGNP Project has the objective of developing the high temperature gas-cooled reactor (HTGR) technology to supply high temperature process heat to industrial processes as a substitute for burning of fossil fuels, such as natural gas. Applications of the HTGR technology that have been evaluated by the NGNP Project for supply of process heat include supply of electricity, steam and high-temperature gas to a wide range of industrial processes, and production of hydrogen and oxygen for use in petrochemical, refining, coal to liquid fuels, chemical, and fertilizer plants.

  18. 24 CFR 266.125 - Scope and nature of sanctions.

    Science.gov (United States)

    2010-04-01

    ... AUTHORITIES HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Housing Finance Agency Requirements § 266.125 Scope and nature of sanctions. (a) Actions by Designated...

  19. Environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    Guidelines are presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec. The statement must include a project justification, description of the biophysical and social environments, a project description, and must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Appendices include a memorandum of understanding, list of members of the review bodies, list of briefs submitted at the public scoping hearings, and a list of public comments on the draft guidelines. 17 figs

  20. Rehabilitation and modernization project of units 1 and 2 of Laguna Verde Nuclear Power Plant. A strengthening project to 120%. (2nd phase)

    International Nuclear Information System (INIS)

    Liebana, B.; Merino, A.; Garcia, J. L.; Gomez, M.; Martinez, I.; Ruiz, L.

    2010-01-01

    The power increase of the Laguna Verde Nuclear Power Plant is a project for the rehabilitation and modernization of the turbo and associated equipment to get an increase of its power and of its service life. The project scope includes the design, the engineering, the equipment supply, the installation, the testing and the commissioning. This article presents the work of the second phase.

  1. 24 CFR 888.301 - Purpose and scope.

    Science.gov (United States)

    2010-04-01

    ..., State Finance Agencies, Section 515 Farmers Home Administration, Section 202 Elderly or Handicapped, and Special Allocations Projects § 888.301 Purpose and scope. (a) Purpose. This subpart describes the basic... Rehabilitation (Part 881); State Finance Agencies (Part 883); and Section 515 Farmers Home Administration (Part...

  2. On the optimal scope of negligence

    NARCIS (Netherlands)

    Dari-Mattiacci, G.

    2005-01-01

    This article studies the optimal scope of negligence, considering which of the parties’ precautionary measures should be included in the determination of negligence and which instead should be omitted. The analysis shows that the optimal scope of negligence balances the gains derived from improved

  3. Towards a Scope Management of Non-Functional Requirements in Requirements Engineering

    NARCIS (Netherlands)

    Kassab, M.; Ormandjieva, O.; Daneva, Maia; Ebert, C.; Herrmann, A.; Rupp, C.

    2007-01-01

    Getting business stakeholders’ goals formulated clearly and project scope defined realistically increases the chance of success for any application development process. As a consequence, stakeholders at early project stages acquire as much as possible knowledge about the requirements, their risk

  4. Denmark's greenhouse gas projections until 2012, an update including a preliminary projection until 2017

    International Nuclear Information System (INIS)

    Fenham, J.

    2003-01-01

    This report presents the results of a project financed by the Danish Energy Agency. The purpose of the project is to make 'with measures' projections of the emissions from Danish sources of the greenhouse gases, CO 2 , CH 4 , N 2 O, HFCs, PFCs and SF 6 . The 'with measures' projection encompasses currently implemented and adopted policies and measures. The time period covered is from 1972, the first year detailed Danish energy statistics were produced, until the first commitment period (2008-2012) under the Kyoto Protocol to the Climate Convention. A preliminary projection is also made for the second commitment period (2013-2017), but here no projections are available for the agricultural sector and the emissions from this sector has therefore been kept equal to the emissions in the first commitment period. Estimations of HFCs, PFCs and SF 6 -emissions and projections cover the period from 1993 until 2020. Only emissions caused by human activities are included in the calculations. However, it can sometimes be difficult to draw the borderline between emissions from nature and anthropogenic emissions. Due to small differences between the methodology used in this project and the methodology (CORINAIR) used by the National Environmental Research Institute for the purpose of annual reporting the estimated emissions presented for the period 1990-2000 may deviate from the official emission estimates report to the EU and the Climate Convention (UNFCCC). Therefore the GHG emission estimates presented in this report for the period until 2000 should only be seen as an illustration of the order of magnitude. This is also the case for the parts of the trend analyses, which are based on the historic data coming from this project. The description of the emissions in the report is structured according to the IPCC sectors: 1) Energy. 2) Industrial processes. 3) Agriculture. 4) Land use change and forestry. 5) Waste. The NMVOC emission from solvent use and other sources is included

  5. Spent Nuclear Fuel project systems engineering management plan

    International Nuclear Information System (INIS)

    Womack, J.C.

    1995-01-01

    The purpose of the WHC Systems Engineering Management Plan (SEMP) is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices to enhance the WHC engineering management of the SNF Project. The scope of the SEMP encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project. This implementation applies to, and is tailored to the needs of the SNF project and all its subprojects, including all current and future subprojects

  6. Trillo NPP full scope replica simulator project: The last great NPP simulation challenge in Spain

    International Nuclear Information System (INIS)

    Rivero, N.; Abascal, A.

    2006-01-01

    In the year 2000, Trillo NPP (Spanish PWR-KWU design nuclear power plant) and Tecnatom came to the agreement of developing a Trillo plant specific simulator, having as scope all the plant systems operated either from the main control room or from the emergency panels. The simulator operation should be carried out both through a control room replica and graphical user interface, this latter based on plant schematics and softpanels concept. Trillo simulator is to be primarily utilized as a pedagogical tool for the Trillo operational staff training. Because the engineering grade of the mathematical models, it will also have additional uses, such as: - Operation engineering (POE's validation, New Computerized Operator Support Systems Validation, etc).; - Emergency drills; -Plant design modifications assessment. This project has become the largest simulation task Tecnatom has ever undertaken, being structured in three different subprojects, namely: - Simulator manufacture, Simulator acceptance and Training material production. Most relevant technological innovations the project brings are: Highest accuracy in the Nuclear Island models, Advanced Configuration Management System, Open Software architecture, Human machine interface new design, Latest design I/O system and an Instructor Station with extended functionality. The Trillo simulator 'Ready for Training' event is due on September 2003, having started the Factory Acceptance Tests in Autumn 2002. (author)

  7. Status of LMFBR development project in Japan

    International Nuclear Information System (INIS)

    Nagane, G.; Akebi, M.; Matsuno, Y.

    1987-01-01

    Initiation of the LMFBR development project in Japan was decided by the Atomic Energy Commission of Japan in 1966. In 1967, the Power Reactor and Nuclear Fuel Development Corporation (PNC) was established to realize the project as a part of its tasks of a wide scope covering all the reseatch and development activities concerning fuel cycle. In the present paper the status of experimental fast reactor (Joyo), which is the first milestone of the LMFBR project, prototype fast reactor (Monju) and R and D activities supporting the project including that for larger LMFBRs in the future is described. (author)

  8. 42 CFR 137.329 - What environmental considerations must be included in the construction project agreement?

    Science.gov (United States)

    2010-10-01

    ... must be included in the construction project agreement? The construction project agreement must include..., and (d) An assurance that no action will be taken on the construction phase of the project that would... 42 Public Health 1 2010-10-01 2010-10-01 false What environmental considerations must be included...

  9. SCOPE: a scorecard for osteoporosis in Europe

    OpenAIRE

    Kanis, J. A.; Borgström, F.; Compston, J.; Dreinhöfer, K.; Nolte, E.; Jonsson, L.; Lems, W. F.; McCloskey, E. V.; Rizzoli, R.; Stenmark, J.

    2013-01-01

    The scorecard summarises key indicators of the burden of osteoporosis and its management in each of the member states of the European Union. The resulting scorecard elements were then assembled on a single sheet to provide a unique overview of osteoporosis in Europe. Introduction: The scorecard for osteoporosis in Europe (SCOPE) is an independent project that seeks to raise awareness of osteoporosis care in Europe. The aim of this project was to develop a scorecard and background documents to...

  10. US Department of Energy Uranium Mill Tailings Remedial Action ground water Project

    International Nuclear Information System (INIS)

    1993-01-01

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA processing sites. The compliance strategy for the processing sites must satisfy requirements of the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1988). This scope of work will entail the following activities, on a site-specific basis: Development of a compliance strategy based upon modification of the UMTRA Surface Project remedial action plans (RAP) or development of Ground Water Project RAPs with NRC and state or tribal concurrence on the RAP; implementation of the RAP to include establishment of institutional controls, where appropriate; institution of long-term verification monitoring for transfer to a separate DOE program on or before the Project end date; and preparation of completion reports and final licensing on those sites that will be completed prior to the Project end date

  11. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD. INTEGRATED DISPOSAL FACILITY (IDF)

    International Nuclear Information System (INIS)

    MCLELLAN, G.W.

    2007-01-01

    permitting, scheduling, costs, stakeholders and technical issues. To meet the customer's needs and deadlines, the project was managed with conscientious discipline and application of sound project management principles in the Project Management Institute's Project Management Body of Knowledge. Several factors contributed to project success. Extensive planning and preparation were conducted, which was instrumental to contract and procurement management. Anticipating issues and risks, CH2M HILL prepared well defined scope and expectations, particularly for safety. To ensure worker safety, the project management team incorporated CH2M HILL's Integrated Safety Management System (ISMS) into the project and included safety requirements in contracting documents and baseline planning. The construction contractor DelHur Industries, Inc. adopted CH2M HILL's safety program to meet the procurement requirement for a comparable ISMS safety program. This project management approach contributed to an excellent safety record for a project with heavy equipment in constant motion and 63,555 man-hours worked. The project manager worked closely with ORP and Ecology to keep them involved in project decisions and head off any stakeholder or regulatory concerns. As issues emerged, the project manager addressed them expeditiously to maintain a rigorous schedule. Subcontractors and project contributors were held to contract commitments for performance of the work scope and requirements for quality, budget and schedule. Another element of project success extended to early and continual involvement of all interested in the project scope. Due to the public sensitivity of constructing a landfill planned for radioactive waste as well as offsite waste, there were many stakeholders and it was important to secure their agreement on scope and time frames. The project had multiple participants involved in quality assurance surveillances, audits and inspections, including the construction contractor, CH2M HILL

  12. Final report Hanford environmental compliance project 89-D-172

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-01-01

    The Hanford Environmental Compliance (HEC) Project is unique in that it consisted of 14 subprojects which varied in project scope and were funded from more that one program. This report describes the HEC Project from inception to completion and the scope, schedule, and cost of the individual subprojects. Also provided are the individual subproject Cost closing statements and Project completion reports accompanied by construction photographs and illustrations

  13. CSIR ScienceScope: An Energy-secure South Africa

    CSIR Research Space (South Africa)

    CSIR

    2009-06-01

    Full Text Available issues, especially as buildings use more than 25% of national energy consumption. "An Energy-secure South Africa" the theme of this ScienceScope, features a multidisciplinary projects of the R&D work done on alternative energy solutions, clean and cleaner...

  14. 75 FR 35020 - Wilkesboro Hydroelectric Company, LLC; Notice Soliciting Scoping Comments

    Science.gov (United States)

    2010-06-21

    ... Hydroelectric Company, LLC; Notice Soliciting Scoping Comments June 15, 2010 Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of.... Applicant: Wilkesboro Hydroelectric Company, LLC. e. Name of Project: W. Kerr Scott Hydropower Project. f...

  15. 36 CFR 294.28 - Scope and applicability.

    Science.gov (United States)

    2010-07-01

    ... SPECIAL AREAS Idaho Roadless Area Management § 294.28 Scope and applicability. (a) After October 16, 2008... National Forest System land issued prior to October 16, 2008. (c) This subpart does not revoke, suspend, or... projects and activities within Idaho Roadless Areas; as shall those related to protection of threatened and...

  16. Integrating the GalileoScope into Successful Outreach Programming

    Science.gov (United States)

    Michaud, Peter D.; Slater, S.; Goldstein, J.; Harvey, J.; Garcia, A.

    2010-01-01

    Since 2004, the Gemini Observatory’s week-long Journey Through the Universe (JTtU) program has successfully shared the excitement of scientific research with teachers, students and the public on Hawaii’s Big Island. Based on the national JTtU program started in 1999, the Hawai‘i version reaches an average of 7,000 students annually and each year features a different theme shared with a diverse set of learners. In 2010, the theme includes the integration of the GalileoScope-produced as a keystone project for the International Year of Astronomy. In preparation, a pilot teacher workshop (held in October 2009) introduced local island teachers to the GalileoScope and a 128-page educator’s activity resource book coordinated by the University of Wyoming. Response from this initial teacher’s workshop has been strong and evaluations plus follow-up actions by participating teachers illustrate that the integration of the GalileoScope has been successful based upon this diverse sample. Integrating GalileoScopes into Chilean schools in 2010 is also underway at Gemini South. This program will solicit informal proposals from educators who wish to use the telescopes in classrooms and a Spanish version of the teacher resource book is planned. The authors conclude that integration of the GalileoScope into an existing outreach program is an effective way to keep content fresh, relevant and engaging for both educators and students. This initiative is funded by Gemini Observatory outreach program. The Gemini Observatory is operated by the Association of Universities for Research in Astronomy, Inc., under a cooperative agreement with the NSF on behalf of the Gemini partnership: the National Science Foundation (US), the Science and Technology Facilities Council (UK), the National Research Council (Canada), CONICYT (Chile), the Australian Research Council (Australia), Ministério da Ciência e Tecnologia (Brazil), and Ministerio de Ciencia, Tecnología e Innovación Productiva

  17. Subject categories and scope descriptions

    International Nuclear Information System (INIS)

    2002-01-01

    This document is one in a series of publications known as the ETDE/INIS Joint Reference Series. It defines the subject categories and provides the scope descriptions to be used for categorization of the nuclear literature for the preparation of INIS and ETDE input by national and regional centres. Together with the other volumes of the INIS Reference Series it defines the rules, standards and practices and provides the authorities to be used in the International Nuclear Information System and ETDE. A complete list of the volumes published in the INIS Reference Series may be found on the inside front cover of this publication. This INIS/ETDE Reference Series document is intended to serve two purposes: to define the subject scope of the International Nuclear Information System (INIS) and the Energy Technology Data Exchange (ETDE) and to define the subject classification scheme of INIS and ETDE. It is thus the guide to the inputting centres in determining which items of literature should be reported, and in determining where the full bibliographic entry and abstract of each item should be included in INIS or ETDE database. Each category is identified by a category code consisting of three alphanumeric characters. A scope description is given for each subject category. The scope of INIS is the sum of the scopes of all the categories. With most categories cross references are provided to other categories where appropriate. Cross references should be of assistance in finding the appropriate category; in fact, by indicating topics that are excluded from the category in question, the cross references help to clarify and define the scope of the category to which they are appended. A Subject Index is included as an aid to subject classifiers, but it is only an aid and not a means for subject classification. It facilitates the use of this document, but is no substitute for the description of the scope of the subject categories

  18. Project Management Methods in Projects Co-financed by EU Funds

    OpenAIRE

    Kostalova, Jana; Tetrevova, Libena; Patak, Michal

    2017-01-01

    This paper deals with the management of projects co-financed by European Union funds (structural funds and the Cohesion Fund) in the Czech Republic (EU projects). The authors aimed to analyze and assess the scope of familiarity with basic project management methods and their application within the implementation of EU projects in the Czech Republic in the Programming Period 2007–2013. Based on a questionnaire survey of EU project organisers, the authors evaluate their attitudes to project man...

  19. 10 CFR 60.1 - Purpose and scope.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Purpose and scope. 60.1 Section 60.1 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES General Provisions § 60.1 Purpose and scope. This part prescribes rules governing the licensing (including issuance...

  20. The Role of the Project Management Office on Information Technology Project Success

    Science.gov (United States)

    Stewart, Jacob S.

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. Assessing critical success factors is another…

  1. Project Management Plan to Maintain Safe and Compliant Conditions at the Plutonium Finishing Plant

    International Nuclear Information System (INIS)

    COX, G.J.

    1999-01-01

    This Project Management Plan presents the overall plan, description, mission, and workscope for the Plutonium Finishing Plant (PFP) maintain safe and compliant conditions project at PFP. This plan presents the overall description, mission, work scope, and planning for the Plutonium Finishing Plant (PFP) Maintain Safe and Compliant Conditions Project at PFP. This project includes all tasks required to maintain the safety boundary for the PFP Complex, except for the 2736-2 Vault Complex and the 234-52 vaults and vault-type rooms. The intent of this plan is to describe how this project will be managed and integrated with the stabilization, and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines that will manage the execution of this project. It describes the organizational approach and roles/responsibilities implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action

  2. IMPLEMENTATION OF WORK LIFE QUALITY PROGRAMS WITH THE PROJECT MANAGEMENT MODEL

    Directory of Open Access Journals (Sweden)

    Maria Lúcia Granja Coutinho

    2010-06-01

    Full Text Available The research studies the implementation of Quality of Working Life (QWL programs using project management techniques. Quality of Work Life projects have undergone a constant increase in scope to the point where they currently involve such diverse themes as change in dietary habits, exercise, stress management, socio environmental responsibility, and adult education. The major focus of this research is to analyze the processes and knowledge areas of project management being used to deal with this increased scope. The managerial processes identified were divided into categories of preparation, structuring, execution, and conclusion. The knowledge areas studied were: communication, risks, human resources, and acquisitions. The firms studied included mid to large sized firms located in the north, southeast and south of Brazil. We interviewed managers, directors, CEOs, plant managers, and line managers as part of this effort. The results suggest that the project management practices used were ad hoc and based on day to day needs. They also suggest that sound project management practices are applicable to QWL programs in the firms we studied.

  3. Pre-Project planning of Capital Facilities at NASA

    OpenAIRE

    Barrow, Benjamin John

    1999-01-01

    This thesis details the development of a NASA specific Project Definition Rating Index (PDRI) tool. This tool is to be used as a checklist for determining the necessary steps to follow in defining project scope and as a means to monitor progress and assess scope definition completeness at various stages during the NASA Pre-Project Planning process. This thesis also describes and identifies specific points in the NASA Capital Facility Programming Cycle for the performance of PDRI assessments ...

  4. On the Scope of Egalitarian Justice

    Directory of Open Access Journals (Sweden)

    Joseph Heath

    2006-05-01

    Full Text Available It is not clear whether the social contract is supposed to merely supplement the unequal gains that individuals are able to make through the exercise of their natural endowments with a set of equal gains secured through social cooperation, or whether the social contract must also compensate individuals for the effects of these natural inequalities, so that they literally become all equal. The issue concerns, in effect, whether natural inequality falls within the scope of egalitarian justice. I think it is fair to say that the majority of egalitarians assume that the principle of equality imposes an obligation to redress natural inequality. Yet there is no consensus on this issue. David Gauthier has made the rejection of the principle of redress a central component of his project. It has often escaped notice that John Rawls also rejects the principle of redress. Thus it is not just anti-egalitarians who reject the principle of redress. There is a current of egalitarian thought– which we might call, for lack of a better term, narrow-scope egalitarianism – which also rejects this principle. In this paper, I would like to show that there is considerable wisdom in the narrow-scope egalitarian position. Many of the problems that lead theorists to reject egalitarianism in its entirety are a consequence, not of the principle of equality per se, but rather of the commitment to redress natural inequality. The narrow-scope view avoids all of these difficulties.

  5. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD INTEGRATED DISPOSAL FACILITY (IDF)

    Energy Technology Data Exchange (ETDEWEB)

    MCLELLAN, G.W.

    2007-02-07

    issues as well as challenges with permitting, scheduling, costs, stakeholders and technical issues. To meet the customer's needs and deadlines, the project was managed with conscientious discipline and application of sound project management principles in the Project Management Institute's Project Management Body of Knowledge. Several factors contributed to project success. Extensive planning and preparation were conducted, which was instrumental to contract and procurement management. Anticipating issues and risks, CH2M HILL prepared well defined scope and expectations, particularly for safety. To ensure worker safety, the project management team incorporated CH2M HILL's Integrated Safety Management System (ISMS) into the project and included safety requirements in contracting documents and baseline planning. The construction contractor DelHur Industries, Inc. adopted CH2M HILL's safety program to meet the procurement requirement for a comparable ISMS safety program. This project management approach contributed to an excellent safety record for a project with heavy equipment in constant motion and 63,555 man-hours worked. The project manager worked closely with ORP and Ecology to keep them involved in project decisions and head off any stakeholder or regulatory concerns. As issues emerged, the project manager addressed them expeditiously to maintain a rigorous schedule. Subcontractors and project contributors were held to contract commitments for performance of the work scope and requirements for quality, budget and schedule. Another element of project success extended to early and continual involvement of all interested in the project scope. Due to the public sensitivity of constructing a landfill planned for radioactive waste as well as offsite waste, there were many stakeholders and it was important to secure their agreement on scope and time frames. The project had multiple participants involved in quality assurance surveillances, audits and

  6. 75 FR 71122 - Erie Boulevard Hydropower L.P.; Notice of Scoping Meetings and Environmental Site Review

    Science.gov (United States)

    2010-11-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7518-012--New York] Erie Boulevard Hydropower L.P.; Notice of Scoping Meetings and Environmental Site Review November 15, 2010. Commission staff will be conducting two public scoping meetings and an environmental site review in support...

  7. Measuring actual scope of nursing practice: a new tool for nurse leaders.

    Science.gov (United States)

    D'Amour, Danielle; Dubois, Carl-Ardy; Déry, Johanne; Clarke, Sean; Tchouaket, Eric; Blais, Régis; Rivard, Michèle

    2012-05-01

    : This project describes the development and testing of the actual scope of nursing practice questionnaire. : Underutilization of the skill sets of registered nurses (RNs) is a widespread concern. Cost-effective, safe, and efficient care requires support by management to facilitate the implementation of nursing practice at the full scope. : Literature review, expert consultation, and face validity testing were used in item development. The instrument was tested with 285 nurses in 22 medical units in 11 hospitals in Canada. : The 26-item, 6-dimension questionnaire demonstrated validity and reliability. The responses suggest that nurses practice at less than their optimal scope, with key dimensions of professional practice being implemented infrequently. : This instrument can help nurse leaders increase the effective use of RN time in carrying out the full scope of their professional practice.

  8. ADS project in the Vinca Institute

    International Nuclear Information System (INIS)

    Pesic, M.; Neskovic, N.; Plecas, I.

    1999-01-01

    Among the six scientific programmes proposed for future research in the Vinca Institute, the nuclear one is connected to the nuclear reactors and waste management activities. One of the projects within the nuclear programme is associated to a proposal for designing a small modern subcritical research reactor driven by an accelerator beam. The idea of this Project is based on the facts that the construction of the Tesla accelerator installation is in the final phase and that a rich experience is gained in design, construction, operation and maintenance of both research reactors in the Institute in the last 40 years. Preliminary scope of the ADS project in the Vinca Institute, including some details and options, are given (author)

  9. 42 CFR 456.150 - Scope.

    Science.gov (United States)

    2010-10-01

    ... ASSISTANCE PROGRAMS UTILIZATION CONTROL Utilization Control: Mental Hospitals § 456.150 Scope. This subpart prescribes requirements for control of utilization of inpatient services in mental hospitals, including...

  10. 75 FR 42742 - Alaska Village Electric Cooperative; Notice of Environmental Site Review and Scoping Meeting

    Science.gov (United States)

    2010-07-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13272-001] Alaska Village Electric Cooperative; Notice of Environmental Site Review and Scoping Meeting July 15, 2010. a. Project No.: 13272-001. b. Name of Project: Old Harbor Hydroelectric Project. c. Location: On Mountain Creek, near the town of Old Harbor, Kodiak Island...

  11. Project quality assurance plant: Sodium storage facility, project F-031

    International Nuclear Information System (INIS)

    Shultz, J.W.; Shank, D.R.

    1994-11-01

    The Sodium Storage Facility Project Quality Assurance Plan delineates the quality assurance requirements for construction of a new facility, modifications to the sodium storage tanks, and tie-ins to the FFTF Plant. This plan provides direction for the types of verifications necessary to satisfy the functional requirements within the project scope and applicable regulatory requirements determined in the Project Functional Design Criteria (FDC), WHC-SD-FF-FDC-009

  12. Including Health in Environmental Assessments of Major Transport Infrastructure Projects: A Documentary Analysis.

    Science.gov (United States)

    Riley, Emily; Harris, Patrick; Kent, Jennifer; Sainsbury, Peter; Lane, Anna; Baum, Fran

    2018-05-10

    Transport policy and practice impacts health. Environmental Impact Assessments (EIAs) are regulated public policy mechanisms that can be used to consider the health impacts of major transport projects before they are approved. The way health is considered in these environmental assessments (EAs) is not well known. This research asked: How and to what extent was human health considered in EAs of four major transport projects in Australia. We developed a comprehensive coding framework to analyse the Environmental Impact Statements (EISs) of four transport infrastructure projects: three road and one light rail. The coding framework was designed to capture how health was directly and indirectly included. We found that health was partially considered in all four EISs. In the three New South Wales (NSW) projects, but not the one South Australian project, this was influenced by the requirements issued to proponents by the government which directed the content of the EIS. Health was assessed using human health risk assessment (HHRA). We found this to be narrow in focus and revealed a need for a broader social determinants of health approach, using multiple methods. The road assessments emphasised air quality and noise risks, concluding these were minimal or predicted to improve. The South Australian project was the only road project not to include health data explicitly. The light rail EIS considered the health benefits of the project whereas the others focused on risk. Only one project considered mental health, although in less detail than air quality or noise. Our findings suggest EIAs lag behind the known evidence linking transport infrastructure to health. If health is to be comprehensively included, a more complete model of health is required, as well as a shift away from health risk assessment as the main method used. This needs to be mandatory for all significant developments. We also found that considering health only at the EIA stage may be a significant

  13. Denmark's greenhouse gas projections until 2012, an update including a preliminary projection until 2017

    Energy Technology Data Exchange (ETDEWEB)

    Fenham, J. [Risoe National Lab., Roskilde (Denmark)

    2003-07-01

    This report presents the results of a project financed by the Danish Energy Agency. The purpose of the project is to make 'with measures' projections of the emissions from Danish sources of the greenhouse gases, CO{sub 2}, CH{sub 4}, N{sub 2}O, HFCs, PFCs and SF{sub 6}. The 'with measures' projection encompasses currently implemented and adopted policies and measures. The time period covered is from 1972, the first year detailed Danish energy statistics were produced, until the first commitment period (2008-2012) under the Kyoto Protocol to the Climate Convention. A preliminary projection is also made for the second commitment period (2013-2017), but here no projections are available for the agricultural sector and the emissions from this sector has therefore been kept equal to the emissions in the first commitment period. Estimations of HFCs, PFCs and SF{sub 6}-emissions and projections cover the period from 1993 until 2020. Only emissions caused by human activities are included in the calculations. However, it can sometimes be difficult to draw the borderline between emissions from nature and anthropogenic emissions. Due to small differences between the methodology used in this project and the methodology (CORINAIR) used by the National Environmental Research Institute for the purpose of annual reporting the estimated emissions presented for the period 1990-2000 may deviate from the official emission estimates report to the EU and the Climate Convention (UNFCCC). Therefore the GHG emission estimates presented in this report for the period until 2000 should only be seen as an illustration of the order of magnitude. This is also the case for the parts of the trend analyses, which are based on the historic data coming from this project. The description of the emissions in the report is structured according to the IPCC sectors: 1) Energy. 2) Industrial processes. 3) Agriculture. 4) Land use change and forestry. 5) Waste. The NMVOC emission from

  14. 22 CFR 18.1 - Scope.

    Science.gov (United States)

    2010-04-01

    ... § 18.1 Scope. This part contains rules governing disciplinary action against a former officer or... employment conflict of interest prohibitions. Such disciplinary action may include prohibition from practice...

  15. Project Design Concept - Primary Ventilation System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    Tank Farm Restoration and Safe Operation (TFRSO), Project W-3 14 was established to provide upgrades that would improve the reliability and extend the system life of portions of the waste transfer, electrical, ventilation, instrumentation and control systems for the Hanford Site Tank Farms. An assessment of the tank farm system was conducted and the results are documented in system assessment reports. Based on the deficiencies identified in the tank farm system assessment reports, and additional requirements analysis performed in support of the River Protection Project (RPP), an approved scope for the TFRSO effort was developed and documented in the Upgrade Scope Summary Report (USSR), WHC-SD-W314-RPT-003, Rev. 4. The USSR establishes the need for the upgrades and identifies the specific equipment to be addressed by this project. This Project Design Concept (PDC) is in support of the Phase 2 upgrades and provides an overall description of the operations concept for the W-314 Primary Ventilation Systems. Actual specifications, test requirements, and procedures are not included in this PDC. The PDC is a ''living'' document, which will be updated throughout the design development process to provide a progressively more detailed description of the W-314 Primary Ventilation Systems design. The Phase 2 upgrades to the Primary Ventilation Systems shall ensure that the applicable current requirements are met for: Regulatory Compliance; Safety; Mission Requirements; Reliability; and Operational Requirements

  16. 76 FR 7835 - Great River Hydropower, LLC; Notice of Scoping Meetings and Environmental Site Review and...

    Science.gov (United States)

    2011-02-11

    ... Hydropower, LLC; Notice of Scoping Meetings and Environmental Site Review and Soliciting Scoping Comments.... c. Date filed: July 12, 2010. d. Applicant: Great River Hydropower, LLC. e. Name of Project: Upper... 796-foot-long by 46-foot-wide by 25-foot-high concrete hydropower structure consisting of 30 turbine...

  17. What are scoping studies? A review of the nursing literature.

    Science.gov (United States)

    Davis, Kathy; Drey, Nick; Gould, Dinah

    2009-10-01

    Scoping studies are increasingly undertaken as distinct activities. The interpretation, methodology and expectations of scoping are highly variable. This suggests that conceptually, scoping is a poorly defined ambiguous term. The distinction between scoping as an integral preliminary process in the development of a research proposal or a formative, methodologically rigorous activity in its own right has not been extensively examined. The aim of this review is to explore the nature and status of scoping studies within the nursing literature and develop a working definition to ensure consistency in the future use of scoping as a research related activity. This paper follows an interpretative scoping review methodology. An explicit systematic search strategy included literary and web-based key word searches and advice from key researchers. Electronic sources included bibliographic and national research register databases and a general browser. The scoping studies varied widely in terms of intent, procedural and methodological rigor. An atheoretical stance was common although explicit conceptual clarification and development of a topic was limited. Four different levels of inquiry ranging from preliminary descriptive surveys to more substantive conceptual approaches were conceptualised. These levels reflected differing dimensional distinctions in which some activities constitute research whereas in others the scoping activities appear to fall outside the remit of research. Reconnaissance emerges as a common synthesising construct to explain the purpose of scoping. Scoping studies in relation to nursing are embryonic and continue to evolve. Its main strengths lie in its ability to extract the essence of a diverse body of evidence giving it meaning and significance that is both developmental and intellectually creative. As with other approaches to research and evidence synthesis a more standardized approach is required.

  18. Asian regional co-operative project on food irradiation: Technology transfer

    International Nuclear Information System (INIS)

    1992-01-01

    These Proceedings include the final reports of work performed by different institutions under the scope of Phase II of the Asian Regional Co-operative Project on Food Irradiation. The topics covered include the disinfestation and decontamination of stored products; improvements in the hygiene of processed seafood; insect disinfestation of fruits; and sprout inhibition of root crops. The individual presentations are indexed separately. Refs, figs and tabs

  19. Design Theory Projectability

    DEFF Research Database (Denmark)

    Baskerville, Richard; Pries-Heje, Jan

    2014-01-01

    design science research is materially prescriptive, it requires a different perspective in developing the breadth of applications of design theories. In this paper we propose different concepts that embody forms of general technological knowledge The concept of projectability, developed originally......Technological knowledge has been characterized as having a scope that is specific to a particular problem. However, the information systems community is exploring forms of design science research that provide a promising avenue to technological knowledge with broader scope: design theories. Because...... as a means of distinguishing realized generalizations from unrealized generalizations, helps explain how design theories, being prescriptive, possess a different form of applicability. The concept of entrenchment describes the use of a theory in many projections. Together these concepts provide a means...

  20. Scope Definition

    DEFF Research Database (Denmark)

    Bjørn, Anders; Owsianiak, Mikołaj; Laurent, Alexis

    2018-01-01

    The scope definition is the second phase of an LCA. It determines what product systems are to be assessed and how this assessment should take place. This chapter teaches how to perform a scope definition. First, important terminology and key concepts of LCA are introduced. Then, the nine items...... making up a scope definition are elaborately explained: (1) Deliverables. (2) Object of assessment, (3) LCI modelling framework and handling of multifunctional processes, (4) System boundaries and completeness requirements, (5) Representativeness of LCI data, (6) Preparing the basis for the impact...... assessment, (7) Special requirements for system comparisons, (8) Critical review needs and (9) Planning reporting of results. The instructions relate both to the performance and reporting of a scope definition and are largely based on ILCD....

  1. 40 CFR 710.4 - Scope of the inventory.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 30 2010-07-01 2010-07-01 false Scope of the inventory. 710.4 Section... ACT TSCA CHEMICAL INVENTORY REGULATIONS General Provisions § 710.4 Scope of the inventory. (a... is extracted from air by any means, will automatically be included in the inventory under the...

  2. Investigation of the Relationship between Green Design and Project Delivery Methods

    Energy Technology Data Exchange (ETDEWEB)

    Bilec, Melissa M.; Ries, Robert J.

    2008-04-24

    The selection of the project delivery method (PDM) for any project is critical--it establishes communication, coordination, and contractual issues between the owner, contractor, and designer. With an increase in the number of green design projects, understanding the relationship between the PDM and green design is paramount to project and contract management. It is reasonable to assume that a positive relationship between green design and design-build (DB) exists since both theoretically are intended to foster an integrated, holistic, and collaborative project. This research examines the relationship between the design-bid-build (DBB), construction management (CM), and DB PDMs and green design with the goal of establishing best practices and identifying potential synergies between them. The research collected information by conducting primarily telephone interviews with approximately twenty-five individuals, including owners, contractors, and designers involved in completed green design projects, mainly in the public sector. The interviews developed a general understanding of the current state of knowledge and experience and not a rigorous quantitative analysis. Upon completion of the interviews, the tabulated results were summarized and green project characteristics and project-PDM interactions emerged. Existing published research was evaluated to reveal aspects of PDMs independent of green design. Best practices were ascertained by combining information from the interviews and published research. Best practices are as follows: (1) Project implementation features--The decision to use DB as PDM on green design or other projects should be based on the specific project features; e.g., well-defined scope and adequate owner staffing. DB will not produce successful results on all projects. (2) Collaboration--Project team collaboration early in the design and construction process is an important aspect of green projects, and collaboration was considered somewhat more

  3. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  4. South African programme for the SCOPE project on the ecology of biological invasions

    CSIR Research Space (South Africa)

    Ferrar, AA

    1983-07-01

    Full Text Available A description of the aims of the international SCOPE programme on biological invasions is provided, together with a proposed four year time table of international activities. This is followed by a brief account of the history, organization...

  5. Expedited technology demonstration project (Revised mixed waste management facility project) Project baseline revision 4.0 and FY98 plan

    International Nuclear Information System (INIS)

    Adamson, M. G.

    1997-01-01

    The re-baseline of the Expedited Technology Demonstration Project (Revised Mixed Waste Facility Project) is designated as Project Baseline Revision 4.0. The last approved baseline was identified as Project Baseline Revision 3.0 and was issued in October 1996. Project Baseline Revision 4.0 does not depart from the formal DOE guidance followed by, and contained in, Revision 3.0. This revised baseline document describes the MSO and Final Forms testing activities that will occur during FY98, the final year of the ETD Project. The cost estimate for work during FY98 continues to be $2.OM as published in Revision 3.0. However, the funds will be all CENRTC rather than the OPEX/CENTRC split previously anticipated. LLNL has waived overhead charges on ETD Project CENRTC funds since the beginning of project activities. By requesting the $2.OM as all CENTRC a more aggressive approach to staffing and testing can be taken. Due to a cost under- run condition during FY97 procurements were made and work was accomplished, with the knowledge of DOE, in the Feed Preparation and Final Forms areas that were not in the scope of Revision 3.0. Feed preparation activities for FY98 have been expanded to include the drum opening station/enclosure previously deleted

  6. Draft environmental impact statement: KENETECH/PacifiCorp Windpower Project, Carbon County, Wyoming

    International Nuclear Information System (INIS)

    1995-01-01

    This Draft Environmental Impact Statement assesses the environmental consequences of a proposed windpower development project in Carbon County, between Arlington and Hanna, Wyoming. Public scoping commenced in January 1994. All issues raised during scoping and interdisciplinary team preparation of the analysis are addressed. The proposed project entails the erection of approximately 1,390 wind turbine generators and associated facilities (e.g., roads, substations, distribution and communications lines) by KENETECH Windpower, Inc. A 230-kV transmission line would be built by PacifiCorp, Inc. to connect a proposed substation on Foote Creek Rim near Arlington to the Miner's substation near Hanna. The proposed project would use standard procedures as currently employed by other right-of-way projects, plus additional project-specific and site-specific mitigation measures to ensure that project impacts are minimized on all important resources. Impacts to most resources would be negligible to moderate during the life-of-project. Potentially significant impacts resulting from the project include avian mortality; declining avian populations; threatened, endangered, candidate, and/or state sensitive species mortality and/or habitat loss; disturbance to nearby residents due to noise; changes in visual resources; disturbance of important Native American traditional sites; changes in plant community species composition due to snow redistribution; displacement of big game due to windfarm operation; and loss of sage grouse nesting habitat. The proposed project could also have numerous beneficial impacts including increased revenues generated by taxes, increased employment, and benefits derived from using a nonpolluting resource for electric power generation

  7. 12 CFR 747.24 - Scope of document discovery.

    Science.gov (United States)

    2010-01-01

    ... act of Congress, or the principles of common law provide. (d) Time limits. All discovery, including... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Scope of document discovery. 747.24 Section 747... of Practice and Procedure § 747.24 Scope of document discovery. (a) Limits on discovery. (1) Subject...

  8. Full-scope training simulators

    International Nuclear Information System (INIS)

    Ugedo, E.

    1986-01-01

    The following topics to be covered in this report are: Reasons justifying the use of full-scope simulators for operator qualification. Full-scope simulator description: the control room, the physical models, the computer complex, the instructor's console. Main features of full-scope simulators. Merits of simulator training. The role of full-scope simulators in the training programs. The process of ordering and acquiring a full-scope simulator. Maintaining and updating simulator capabilities. (orig./GL)

  9. 78 FR 54884 - Antrim County; Notice of Intent To Prepare an Environmental Assessment and Notice of Scoping...

    Science.gov (United States)

    2013-09-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3030-019] Antrim County; Notice of Intent To Prepare an Environmental Assessment and Notice of Scoping Meeting and Environmental Site Review and Soliciting Scoping Comments Take notice that the following hydroelectric application has been filed with the Commission and is...

  10. SRP decontamination and decommissioning scoping study

    International Nuclear Information System (INIS)

    Martin, W.P.

    1986-06-01

    Of the approximately 3000 site facilities, 496 were judged to be radioactively contaminated thereby requiring Decontamination and Decommissioning (D and D) after shutdown. To enable projection of D and D timing for each of the 496 facilities, a plant shutdown schedule was developed. A 5-year ''cool-down'' period was added to the highly contaminated facilities to allow radioactive decay resulting in a reduction of cost, waste volume, and radiation exposure. D and D of all facilities is projected to be completed in FY 2045. Since essentially all of the plant facilities are scheduled to operate past FY 2000, only seventy-four of the 496 facilities are projected to be decommissioned prior to FY 2000. These facilities include currently excessed facilities and those scheduled for shutdown in the near future - seepage basins, HWCTR, R-Reactor, high level waste tanks, etc. The type of D and D chosen is the factor having the most significant effect on D and D costs and waste volumes. The two types of final D and D are Entombment and Dismantlement. Dismantlement can increase costs and waste volumes by a factor of 2 to 100 compared to Entombment. This point should be kept in mind when reviewing this scoping study as approximately 75% of the projects are estimated based upon the less costly Entombment option. The D and D estimates for the 496 facilities are summarized by plant area in Table 3 and by custodian group (Program/General Department) in Table 4. The total estimated D and D cost in constant FY 1986 dollars is approximately $800,000,000, with total solid waste volumes of 5,000,000 and 170,000 cubic feet, for low level waste (LLW) and transuranic waste (TRU), respectively. A 6% annual escalation factor increases the total project costs of 800,000,000, FY 1986 dollars to 7 billion dollars. 27 refs

  11. IPMA Standard Competence Scope in Project Management Education

    Science.gov (United States)

    Bartoška, Jan; Flégl, Martin; Jarkovská, Martina

    2012-01-01

    The authors of the paper endeavoured to find out key competences in IPMA standard for educational approaches in project management. These key competences may be used as a basis for project management university courses. An incidence matrix was set up, containing relations between IPMA competences described in IPMA competence baseline. Further,…

  12. Homeless Education Project 1996-97. Scope of Program.

    Science.gov (United States)

    West Contra Costa Unified School District, CA.

    The documents in this collection relate to the Homeless Education Project conducted in the elementary and secondary schools of the West Contra Costa Unified School District (California). The first document is a chart describing the project and its main goals: (1) an accelerated curriculum in reading and mathematics; (2) effective procedures for…

  13. ANALYSIS OF TIME MANAGEMENT APPLIED TO A PROJECT OF OIL

    Directory of Open Access Journals (Sweden)

    Arielle Meireles Moreira

    2011-05-01

    Full Text Available Project management (PM efficient results in increased probability of success of activities and its completion as time, cost and scope planned. Since this triad (time, cost and scope is connected, any changes will affect within the scope and increase the cost of the project. This was a case study in a large company exploiting oil and gas. The research is focused on time management (TM in an oil project in order to examine the schedule of activities according to the time tool, the Gantt Chart in MS Project 2003 software. The study design was selected due to its long delay in implementation and lack of planning and managing this. By analyzing the Gantt Chart, activities were identified late. With this, the problems that caused delays were surveyed (the project documents and their parents questioned. Thus, it was proposed improvements to an effective control of time on the problems encountered.

  14. Scope Complexity Options Risks Excursions (SCORE) Factor Mathematical Description.

    Energy Technology Data Exchange (ETDEWEB)

    Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Samberson, Jonell Nicole [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Shettigar, Subhasini [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jungels, John [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Welch, Kimberly M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jones, Dean A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-03-01

    The purpose of the Scope, Complexity, Options, Risks, Excursions (SCORE) model is to estimate the relative complexity of design variants of future warhead options, resulting in scores. SCORE factors extend this capability by providing estimates of complexity relative to a base system (i.e., all design options are normalized to one weapon system). First, a clearly defined set of scope elements for a warhead option is established. The complexity of each scope element is estimated by Subject Matter Experts (SMEs), including a level of uncertainty, relative to a specific reference system. When determining factors, complexity estimates for a scope element can be directly tied to the base system or chained together via comparable scope elements in a string of reference systems that ends with the base system. The SCORE analysis process is a growing multi-organizational Nuclear Security Enterprise (NSE) effort, under the management of the NA-12 led Enterprise Modeling and Analysis Consortium (EMAC). Historically, it has provided the data elicitation, integration, and computation needed to support the out-year Life Extension Program (LEP) cost estimates included in the Stockpile Stewardship Management Plan (SSMP).

  15. Software-Enabled Project Management Techniques and Their Relationship to the Triple Constraints

    Science.gov (United States)

    Elleh, Festus U.

    2013-01-01

    This study investigated the relationship between software-enabled project management techniques and the triple constraints (time, cost, and scope). There was the dearth of academic literature that focused on the relationship between software-enabled project management techniques and the triple constraints (time, cost, and scope). Based on the gap…

  16. When Serious Project Management is a Critical Business Requirement

    Science.gov (United States)

    Jansma, P. A.; Gibby, L.; Chambers, C.; Joines, J.; Egger, R.

    2000-01-01

    When serious project management is a critical business requirement, project managers need to integrate cost, schedule and technical scope of work across the project, and apply earned value management (EVM).

  17. Project Management Performance Drivers

    OpenAIRE

    Ra’ad, Mohammed A.; Najdawi, Mohammad K.

    2010-01-01

    The practice of project management has gained enormous importance over the past several years in various business industries. “In industries as diverse as pharmaceuticals, software, and aerospace, projects drive business” (Wheatley). This gain of importance can be attributed to the magnitude of the impact project performance results in terms of time, cost, and scope have over the project performing entity. “On the basis of data released by the Bureau of Economic Analysis, part of the US De...

  18. Scrum Project Management

    CERN Document Server

    Pries, Kim H

    2010-01-01

    Scrum, which was originally invented solely for software development, can now be applied to all types of projects. This book shows project managers how to implement Scrum by explaining the artifacts, rituals, and roles used. The text provides Scrum planning methods to control project scope and schedule as well as Scrum tracking methods to focus teams on improving throughput and streamlining communications. The authors show how to combine traditional project methods with Scrum and how to adapt the familiar work breakdown structure to create Scrum backlogs and sprints. They also demonstrate how

  19. Energy Data Base: Subject categories and scope: A reference manual

    International Nuclear Information System (INIS)

    Grissom, M.C.

    1987-04-01

    The subject scope of the Energy Data Base (EDB) is defined, encompassing all technological aspects of energy production, conversion, and efficient utilization, and the economic, social, and political aspects as well. Coverage also includes the basic sciences as applicable. The subject areas within the scope of EDB are defined and hierarchically numbered, and scope notes are provided to define the extent of interest in certain areas, particularly areas of basic research

  20. Using EarthScope Construction of the Plate Boundary Observatory to Provide Locally Based Experiential Education and Outreach

    Science.gov (United States)

    Jackson, M.; Eriksson, S.; Barbour, K.; Venator, S.; Mencin, D.; Prescott, W.

    2006-12-01

    region to study the area between the San Andreas Fault and the San Jacinto Fault. The event provided an opportunity for the Pathfinder Ranch to unveil the instruments and describe the important science behind the project to the school's students, staff, and board members. The two strainmeters will be used as a teaching tool for several years as hundreds of students filter through Pathfinder school. UNAVCO sponsors a summer PBO Student Field Assistant Program designed to give students from a variety of educational backgrounds the opportunity get involved in the construction of the EarthScope PBO project. The goal of the program is to excite students about the geodetic sciences through direct work experience. Over the summers of 2005 and 2006, PBO sponsored a total of 11 student assistants who helped to install GPS and strainmeter stations and to perform operations and maintenance tasks. PBO plans to expand this program in 2007 by including student assistants in our data management and strainmeter data processing activities. In August, 2006, UNAVCO led a group of scientists, teachers, and curriculum developers to identify key scientific concepts of EarthScope research and how they can be translated into the Earth Science classroom at the middle and high school levels. The focus was on the Cascadia region. A feature of the workshop was to use PBO and USArray data in the classroom.

  1. ORGANIZATION OF FUTURE ENGINEERS' PROJECT-BASED LEARNING WHEN STUDYING THE PROJECT MANAGEMENT METHODOLOGY

    Directory of Open Access Journals (Sweden)

    Halyna V. Lutsenko

    2015-02-01

    Full Text Available The peculiarities of modern world experience of implementation of project-based learning in engineering education have been considered. The potential role and place of projects in learning activity have been analyzed. The methodology of organization of project-based activity of engineering students when studying the project management methodology and computer systems of project management has been proposed. The requirements to documentation and actual results of students' projects have been described in detail. The requirements to computer-aided systems of project management developed by using Microsoft Project in the scope of diary scheduling and resources planning have been formulated.

  2. Scopes for Schools: What do students know about light and mirrors?

    Science.gov (United States)

    Stassun, K.; Fabian, D.; Brissenden, G.; Lattis, J.

    2002-05-01

    The 'Scopes for Schools Project is an inquiry- and standards-based program that unites K-12 teachers, students, and professional astronomers to conduct outreach, curriculum development, and teacher professional development in astronomy. The main activities of S4S ('Scopes for Schools) are a teacher professional development workshop to increase teachers' astronomy content and pedagogical content knowledge, provide modeled curriculum activities, and the physical materials needed for doing astronomy in the classroom. We then build low-cost, high-quaility Dobsonian telescopes in the classroom with the students supplemented with fun, collaborative, inquiry-based astronomy activities. Finally, we help support the new teacher partners by assisting with star parties and astronomy club development. Previously, the curriculum development aspects of S4S have focused on post-telescope building activities, but in an attempt to provide a clear understanding of the optical properties of a telescope, we have developed an activity that explores how light interacts with a bare mirror. By grades 6-8, we have observed strongly held alternative conceptions about sight, the nature of light, and its interaction with reflective surfaces. We specifically and rigorously address this problem and the Benchmark ``Something can be "seen" when light waves emitted or reflected by it enter the eye-just as something can be "heard" when sound waves from it enter the ear.'' (Project 2061) with an activity that encourages students to manipulate a mirror and a light source to discover how images are formed. Students also gain experience with multiple variables in an experiment and the idea that it may not be possible to prevent outside factors from influencing the experiment. We discuss how this ``mirror activity'' relates to the cognitive development of students, the standards, and the greater S4S project. The 'Scopes for Schools Project has recieved funding from the Wisconsin Space Grant Consortium

  3. 242-A evaporator quality assurance project plan: Revision 1

    International Nuclear Information System (INIS)

    Tucker, B.J.

    1994-01-01

    The scope of this quality assurance project plan (Plan) is sampling and analytical services including, but not limited to, sample receipt, handling and storage, analytical measurements, submittal of data deliverables, archiving selected portions of samples, returning unneeded sample material to Westinghouse Hanford Company (WHC), and/or sample disposal associated with candidate feed samples and process condensate compliance samples. Sampling and shipping activities are also included within the scope. The purpose of this project is to provide planning, implementation, and assessment guidance for achieving established data quality objectives measurement parameters. This Plan requires onsite and offsite laboratories to conform to that guidance. Laboratory conformance will help ensure that quality data are being generated and therefore, that the 242-A evaporator is operating in a safe and compliant manner. The 242-A evaporator feed stream originates from double-shell tanks (DSTs) identified as candidate feed tanks. The 242-A evaporator reduces the volume of aqueous waste contained in DSTs by boiling off water and sending it to the Liquid Effluent Retention Facility (LERF) storage basin before further treatment. The slurry product is returned to DSTs. Evaporation results in considerable savings by reducing the volume of mixed waste for disposal

  4. Knowledge Syntheses in Medical Education: Demystifying Scoping Reviews.

    Science.gov (United States)

    Thomas, Aliki; Lubarsky, Stuart; Durning, Steven J; Young, Meredith E

    2017-02-01

    An unprecedented rise in health professions education (HPE) research has led to increasing attention and interest in knowledge syntheses. There are many different types of knowledge syntheses in common use, including systematic reviews, meta-ethnography, rapid reviews, narrative reviews, and realist reviews. In this Perspective, the authors examine the nature, purpose, value, and appropriate use of one particular method: scoping reviews. Scoping reviews are iterative and flexible and can serve multiple main purposes: to examine the extent, range, and nature of research activity in a given field; to determine the value and appropriateness of undertaking a full systematic review; to summarize and disseminate research findings; and to identify research gaps in the existing literature. Despite the advantages of this methodology, there are concerns that it is a less rigorous and defensible means to synthesize HPE literature. Drawing from published research and from their collective experience with this methodology, the authors present a brief description of scoping reviews, explore the advantages and disadvantages of scoping reviews in the context of HPE, and offer lessons learned and suggestions for colleagues who are considering conducting scoping reviews. Examples of published scoping reviews are provided to illustrate the steps involved in the methodology.

  5. Scope of radon monitoring for earthquake-studies in India

    International Nuclear Information System (INIS)

    Virk, H.S.

    1994-01-01

    In India, there is scope for investigating and exploiting radon as a precursor for earthquakes and for exploration of hydrocarbon deposits. This report mainly deals with the investigations carried out in Kangra and Chamba valleys of Himachal Pradesh under Himalayan Seismicity Project of Department of Science and Technology, Govt. of India. 20 refs., 4 figs., 1 tab

  6. Plastic surgery in Nigeria-Scope and challenges

    Directory of Open Access Journals (Sweden)

    TOG Chukwuanukwu

    2011-01-01

    Full Text Available Background Plastic surgery as a major subspecialty of surgery has existed in Nigeria for several decades but the populace including medical practitioners are yet to fully appreciate its scope. This leads to very late presentation/referral of cases and management of cases that should have been referred by less qualified practitioners with attendant poor outcomes and complications. Most people still regard plastic surgery as being synonymous with cosmetic/aesthetic surgery but the scope goes far beyond this entity. It is therefore important that the public including medical practitioners who are the main sources of referral to the subspecialty are aware of the range of cases handled by plastic surgery units. The plastic surgeon in Nigeria is also faced with a lot of challenges ranging from the arduous task of one having to manage very many different and complicated cases to being very poorly equipped and appreciated. Objectives To educate the populace especially the medical practitioners on the scope of plastic surgery and the extent of development of the subspecialty in Nigeria and solicit for colleague′s cooperation in order to move plastic surgery forward. To also highlight the difficulties faced by the plastic surgeon in Nigeria and seeking help from appropriate quarters which will help to reduce unnecessary referrals abroad while improving the services rendered to patients locally. Conclusion Plastic surgery in Nigeria has developed significantly both in scope and manpower but it is still faced with a lot of challenges. Knowledge of its scope will help to reduce unnecessary referrals abroad while improving services/skill here in Nigeria.

  7. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    Science.gov (United States)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  8. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-420. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance. This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  9. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  10. Nuclear criticality project plan for the Hanford Site tank farms

    Energy Technology Data Exchange (ETDEWEB)

    Bratzel, D.R., Westinghouse Hanford

    1996-08-06

    The mission of this project is to provide a defensible technical basis report in support of the Final Safety Analysis Report (FSAR). This technical basis report will also be used to resolve technical issues associated with the nuclear criticality safety issue. The strategy presented in this project plan includes an integrated programmatic and organizational approach. The scope of this project plan includes the provision of a criticality technical basis supporting document (CTBSD) to support the FSAR as well as for resolution of the nuclear criticality safety issue. Specifically, the CTBSD provides the requisite technical analysis to support the FSAR hazard and accident analysis as well as for the determination of the required FSAR limits and controls. The scope of The CTBSD will provide a baseline for understanding waste partitioning and distribution phenomena and mechanistics for current operational activities inclusive of single-shell tanks, double-shell tanks, double-contained receiver tanks, and miscellaneous underground storage tanks.. Although the FSAR does not include future operational activities, the waste partitioning and distribution phenomena and mechanistics work scope identified in this project plan provide a sound technical basis as a point of departure to support independent safety analyses for future activities. The CTBSD also provides the technical basis for resolution of the technical issues associated with the nuclear criticality safety issue. In addition to the CTBSD, additional documentation will be required to fully resolve U.S. Department of Energy-Headquarters administrative and programmatic issues. The strategy and activities defined in this project plan provide a CTBSD for the FSAR and for accelerated resolution of the safety issue in FY 1996. On April 30, 1992, a plant review committee reviewed the Final Safety Analysis Reports for the single-shell, double-shell, and aging waste tanks in light of the conclusions of the inadequate waste

  11. The High Flux Isotope Reactor (HFIR) cold source project at ORNL

    International Nuclear Information System (INIS)

    Selby, D.

    1998-01-01

    The scope of this project includes the development, design, procurement/fabrication, testing, and installation of all of the components necessary to produce a working cold source within an existing HFIR beam tube hole in the pressure vessel. All aspects of the cold source design will be based on demonstrated technology adapted to the HFIR design and operating conditions

  12. Harry Potter and the sorcerer's scope: latent scope biases in explanatory reasoning.

    Science.gov (United States)

    Khemlani, Sangeet S; Sussman, Abigail B; Oppenheimer, Daniel M

    2011-04-01

    What makes a good explanation? We examine the function of latent scope, i.e., the number of unobserved phenomena that an explanation can account for. We show that individuals prefer narrow latent scope explanations-those that account for fewer unobserved effects-to broader explanations. In Experiments 1a-d, participants found narrow latent scope explanations to be both more satisfying and more likely. In Experiment 2 we directly manipulated base rate information and again found a preference for narrow latent scope explanations. Participants in Experiment 3 evaluated more natural explanations of unexpected observations, and again displayed a bias for narrow latent scope explanations. We conclude by considering what this novel bias tells us about how humans evaluate explanations and engage in causal reasoning.

  13. Professional Development for Researchers in Solid Earth Science Evolved to Include Scientific and Educational Content

    Science.gov (United States)

    Eriksson, S. C.; Arrowsmith, R.; Olds, S. E.

    2011-12-01

    Integrated measures of crustal deformation provide valuable insight about tectonic and human-induced processes for scientists and educators alike. UNAVCO in conjunction with EarthScope initiated a series of short courses for researchers to learn the processing and interpretation of data from new technologies such as high precision GPS, Strainmeter, InSar and LiDAR that provide deformation information relevant to many geoscience sub-disciplines. Intensive short courses of a few days and the widespread availability of processed data through large projects such as EarthScope and GEON enable more geoscientists to incorporate these data into diverse projects. Characteristics of the UNAVCO Short Course Series, reaching over 400 participants since 2005, include having short course faculty who have pioneered development of each technology; open web-access to course materials; processing software installed on class-ready computers; no course fees; scholarships for students, post-doctoral fellows, and emerging faculty when needed; formative evaluation of the courses; community-based decisions on topics; and recruitment of participants across relevant geoscience disciplines. In 2009, when EarthScope airborne LiDAR data became available to the public through OpenTopographhy, teaching materials were provided to these researchers to incorporate the latest technologies into teaching. Multiple data sets across technologies have been developed with instructions on how to access the various data sets and incorporate them into geological problem sets. Courses in GPS, airborne LiDAR, strainmeter, and InSAR concentrate on data processing with examples of various geoscience applications. Ground-based LiDAR courses also include data acquisition. Google Earth is used to integrate various forms of data in educational applications. Various types of EarthScope data can now be used by a variety of geoscientists, and the number of scientists who have the skills and tools to use these various

  14. Remedial action and waste disposal project -- 300-FF-1 remedial action readiness assessment report

    International Nuclear Information System (INIS)

    Carson, J.W.; Carlson, R.A.; Greif, A.A.; Johnson, C.R.; Orewiler, R.I.; Perry, D.M.; Remsen, W.E.; Tuttle, B.G.; Wilson, R.C.

    1997-09-01

    This report documents the readiness assessment for initial startup of the 300-FF-1 Remedial Action Task. A readiness assessment verifies and documents that field activities are ready to start (or restart) safely. The 300-FF-1 assessment was initiated in April 1997. Readiness assessment activities included confirming the completion of project-specific procedures and permits, training staff, obtaining support equipment, receipt and approval of subcontractor submittals, and mobilization and construction of site support systems. The scope of the 300-FF-1 Remedial Action Task includes excavation and disposal of contaminated soils at liquid waste disposal facilities and of waste in the 618-4 Burial Ground and the 300-FF-1 landfills. The scope also includes excavation of test pits and test trenches

  15. Field-Reversed Configuration Power Plant Critical-Issue Scoping Study

    International Nuclear Information System (INIS)

    Santarius, J. F.; Mogahed, E. A.; Emmert, G. A.; Khater, H. Y.; Nguyen, C. N.; Ryzhkov, S. V.; Stubna, M. D.

    2000-01-01

    A team from the Universities of Wisconsin, Washington, and Illinois performed an engineering scoping study of critical issues for field-reversed configuration (FRC) power plants. The key tasks for this research were (1) systems analysis for deuterium-tritium (D-T) FRC fusion power plants, and (2) conceptual design of the blanket and shield module for an FRC fusion core. For the engineering conceptual design of the fusion core, the project team focused on intermediate-term technology. For example, one decision was to use steele structure. The FRC systems analysis led to a fusion power plant with attractive features including modest size, cylindrical symmetry, good thermal efficiency (52%), relatively easy maintenance, and a high ratio of electric power to fusion core mass, indicating that it would have favorable economics

  16. Field-Reversed Configuration Power Plant Critical-Issue Scoping Study

    Energy Technology Data Exchange (ETDEWEB)

    Santarius, J. F.; Mogahed, E. A.; Emmert, G. A.; Khater, H. Y.; Nguyen, C. N.; Ryzhkov, S. V.; Stubna, M. D.

    2000-03-31

    A team from the Universities of Wisconsin, Washington, and Illinois performed an engineering scoping study of critical issues for field-reversed configuration (FRC) power plants. The key tasks for this research were (1) systems analysis for deuterium-tritium (D-T) FRC fusion power plants, and (2) conceptual design of the blanket and shield module for an FRC fusion core. For the engineering conceptual design of the fusion core, the project team focused on intermediate-term technology. For example, one decision was to use steele structure. The FRC systems analysis led to a fusion power plant with attractive features including modest size, cylindrical symmetry, good thermal efficiency (52%), relatively easy maintenance, and a high ratio of electric power to fusion core mass, indicating that it would have favorable economics.

  17. A brief account of Kozloduy 6 full-scope replica control room simulator upgrade experience: An engineering point of view

    International Nuclear Information System (INIS)

    Dinkov, Y.D.

    2006-01-01

    A short excursion throughout Kozloduy NPP history, and Kozloduy 6 Full-Scope Replica Control Room Simulator procurement, is proposed for a reader, which is not familiar with the Kozloduy circumstances. A brief account of five year operation and upgrade experience is presented as seen by the Kozloduy simulator engineering team. During the last five years Kozloduy 6 is going through a complex and expensive modernization programme so Simulator is a subject of a series of changes twice per year. Simulator is used for training six months of the year during spring and autumn most of this time in two shifts daily. Remaining six months during winter and summer are allocated to other simulator uses including five months downtime for hardware reconstruction, software integration, troubleshooting and testing. Quantitative information concerning scope of software and hardware changes is given. Kozloduy NPP simulator engineering team approach toward various upgrade projects is given in an attempt to facilitate a discussion about how a simulator upgrade should be performed. Projects mentioned vary from small to big, in-house or contracted, already completed or planned for future realization

  18. Assessing health impacts in complex eco-epidemiological settings in the humid tropics: The centrality of scoping

    International Nuclear Information System (INIS)

    Winkler, Mirko S.; Divall, Mark J.; Krieger, Gary R.; Balge, Marci Z.; Singer, Burton H.; Utzinger, Juerg

    2011-01-01

    Natural resources development projects are - and have been for more than 150 years - located in remote rural areas in developing countries, where local level data on community health is notoriously scarce. Health impact assessment (HIA) aims at identifying potential negative health consequences of such projects and providing the initial evidence-base for prevention and mitigation of diseases, injuries and risk factors, as well as promotion of positive effects. An important, but under-systematised early phase of the HIA process is scoping. It aims at organising diverse, often fragmentary, evidence and identifying potential project-related health impacts and underlying data gaps. It is also a key element in defining the terms of reference for the entire assessment. We present novel methodological features for the scoping process, emphasising the evaluation of quality of evidence, and illustrate its use in a contemporary HIA of the Simandou iron ore project in the Republic of Guinea. Assessment of data quality is integrated with specific content information via an analytical framework for the systematic identification of health outcomes and determinants of major concern. A subsequent gap analysis is utilised to assess the need for further baseline data collection and to facilitate the specification of a set of potential key performance indicators and strategies to inform the required evidence-base. We argue that scoping also plays a central role in the design of surveillance systems for longitudinal monitoring of health, equity and wellbeing following project implementation.

  19. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  20. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  1. "High/Scope Supporting the Child, the Family, the Community": A Report of the Proceedings of the High/Scope Ireland Third Annual Conference, 12th October 2004, Newry, Northern Ireland

    Science.gov (United States)

    Peyton, Lynne

    2005-01-01

    The third annual High/Scope Ireland Conference provided a forum for speakers workshop leaders and delegates from across Ireland, the UK, USA, Europe and South Africa to share their experiences of High/Scope in action. Research demonstrates that long term benefits for High/Scope participants include increased literacy rates, school success and…

  2. Tritium Facilities Modernization and Consolidation Project Process Waste Assessment (Project S-7726)

    Energy Technology Data Exchange (ETDEWEB)

    Hsu, R.H. [Westinghouse Savannah River Company, AIKEN, SC (United States); Oji, L.N.

    1997-11-14

    Under the Tritium Facility Modernization {ampersand} Consolidation (TFM{ampersand}C) Project (S-7726) at the Savannah River Site (SS), all tritium processing operations in Building 232-H, with the exception of extraction and obsolete/abandoned systems, will be reestablished in Building 233-H. These operations include hydrogen isotopic separation, loading and unloading of tritium shipping and storage containers, tritium recovery from zeolite beds, and stripping of nitrogen flush gas to remove tritium prior to stack discharge. The scope of the TFM{ampersand}C Project also provides for a new replacement R&D tritium test manifold in 233-H, upgrading of the 233- H Purge Stripper and 233-H/234-H building HVAC, a new 234-H motor control center equipment building and relocating 232-H Materials Test Facility metallurgical laboratories (met labs), flow tester and life storage program environment chambers to 234-H.

  3. 25 CFR 170.915 - May tribal employment taxes or fees be included in an IRR project budget?

    Science.gov (United States)

    2010-04-01

    ... Preference § 170.915 May tribal employment taxes or fees be included in an IRR project budget? Yes. The cost of tribal employment taxes or fees may be included in the budget for an IRR program or project... 25 Indians 1 2010-04-01 2010-04-01 false May tribal employment taxes or fees be included in an IRR...

  4. Fessenheim simulator for OECD Halden Reactor Project

    International Nuclear Information System (INIS)

    Oudot, G.; Bonnissent, B.

    1998-01-01

    A full scope NPP simulator is presently under manufacture by THOMSON TRAINING and SIMULATION (TTandS) in Cergy (France) for the OECD HALDEN REACTOR PROJECT. The reference plant of this simulator is the Fessenheim CP0 PWR power plant operated by the French utility EDF, for which TTandS has delivered a full scope training simulator in mid 1997. The simulator for HALDEN Reactor Project is based on a software duplication of the Fessenheim simulator delivered to EDF, ported on the most recent computers and O.S. available. This paper outlines the main features of this new simulator generation which reaps benefit of the advanced technologies of the SIPA design simulator introduced inside a full scope simulator. This kind of simulator is in fact the synthesis between training and design simulators and offers therefore added technical capabilities well suited to HALDEN needs. (author)

  5. Structuring a mega-project

    Energy Technology Data Exchange (ETDEWEB)

    Kutryk, T. [Husky Oil Operations Ltd., Calgary, AB (Canada)

    2004-07-01

    This paper presented an overview of mega-project management. Issues concerning scope, cost and schedule were discussed, with reference to the idea that a choice must be made from the outset as to which of the 3 is a main priority. The importance of preparation and the development of a fully resourced plan was emphasized. The use of the parametric 4-D model was discussed. Lessons that the construction industry may learn from manufacturers were presented along with issues of contract development and the role and importance of the project manager. Issues concerning performance measurement were reviewed, including lagging indicators. Project division factors were also discussed, with reference to data lags, naturally concurrent processes and over the fence units. A case study of Walmart was presented. Project design packages and long lead time items were discussed, as were issues concerning human resources. Functional units were examined in relation to zones of influence and unit integration. Various combinations of zones of influence were presented. Issues concerning span of control and varying relationships within a project were discussed. It was emphasized that great deeds can be accomplished by attracting the best people. tabs., figs.

  6. 47 CFR 90.521 - Scope.

    Science.gov (United States)

    2010-10-01

    ... systems operating in the 763-775 MHz and 793-805 MHz frequency bands. It includes eligibility, operational... 47 Telecommunication 5 2010-10-01 2010-10-01 false Scope. 90.521 Section 90.521 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PRIVATE LAND MOBILE RADIO...

  7. 75 FR 36301 - Review and Approval of Projects

    Science.gov (United States)

    2010-06-25

    ... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Parts 806 and 808 Review and Approval of Projects AGENCY... document contains proposed rules that would amend the project review regulations of the Susquehanna River... the scope of withdrawals requiring review and approval; improve notice procedures for all project...

  8. Energy Data Base: subject categories and scope

    International Nuclear Information System (INIS)

    Bost, D.E.

    1985-03-01

    The subject scope of the Energy Data Base (EDB) encompasses all DOE-sponsored research. Broadly defined, EDB subject scope includes all technological aspects of energy production, conversion, and efficient utilization, and the economic, social, and political aspects as well. Scope notes are provided to define the extent of interest in certain subject areas, particularly areas of basic research. Cross references between categories are provided to aid both the categorization of information and its retrieval. Citations entered into DOE's computerized bibliographic information system are assigned six-digit subject category numbers to broadly group information for storage, retrieval, and manipulation. These numbers are used in the preparation of printed documents, such as bibliographies and abstract journals, to arrange the citations and to aid searching on the DOE/RECON on-line system

  9. Using project management techniques in hydro-relicensing

    International Nuclear Information System (INIS)

    Dominie, D.; Richard, J.

    1991-01-01

    This paper reports that to answer a pressing need for managing today's complex process and requirements of hydro relicensing, Central Maine Power Company has applied the principles of project management, including the use of computerized scheduling to its hydro relicensing efforts. This approach involves early inter-departmental cooperation in mapping out critical path scheduling by requiring the project team to: Outline the scope of the project in its entirety. Clarify and define components of the project. Quantify and categorize assumptions and dependencies. Identify constraints. The computer-generated schedule of this cooperative planning effort provides a graphic representation of the team's plan and become the focal point for refinements and adjustments necessary to complete an application on time. The use of project management techniques facilities team understanding of the realities and limitations in the relicensing process. These techniques encourage cooperative action, and use a solution-oriented process resulting in a product which can be a useful tool in communicating with resource agencies and regulators

  10. Business Intelligence Support For Project Management

    OpenAIRE

    Muntean, Mihaela; Cabau, Liviu Gabiel

    2013-01-01

    With respect to the project management framework, a project live cycle consists of phases like: initiation, planning, execution, monitoring & control and closing. Monitoring implies measuring the progress and performance of the project during its execution and communicating the status. Actual performance is compared with the planned one. Therefore, a minimal set of key performance indicators will be proposed. Monitoring the schedule progress, the project budget and the scope will be possible....

  11. Project brief of pre-contract in project management

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim; Mohd Azmi Sidid Omar; Abdul Rahman Norazumin; Zakaria Dris; Abdul Murad Abu Bakar; Alwi Othman

    2010-01-01

    Project brief is a comprehensive document used in translating the user needs and requirement for the project implementation. This document is important for the designer as a main guidance towards establishing project details. Research shown that problem usually arises from not well-defined scope and needs by the user. With lack of information the designer tend to assume and interprets wrong translation. Other issues arise from project management are time, cost, budgetary, lack of communication and establishing quality management. Some ideas of improvement were gain by doing cross reference with JKR quality system management, workshop and brainstorming. It shows that an improvement of data collection system has to be integrating with some basic format details, drawings and declaration forms to be established. (author)

  12. Warm Water Oxidation Verification - Scoping and Stirred Reactor Tests

    Energy Technology Data Exchange (ETDEWEB)

    Braley, Jenifer C.; Sinkov, Sergey I.; Delegard, Calvin H.; Schmidt, Andrew J.

    2011-06-15

    Scoping tests to evaluate the effects of agitation and pH adjustment on simulant sludge agglomeration and uranium metal oxidation at {approx}95 C were performed under Test Instructions(a,b) and as per sections 5.1 and 5.2 of this Test Plan prepared by AREVA. (c) The thermal testing occurred during the week of October 4-9, 2010. The results are reported here. For this testing, two uranium-containing simulant sludge types were evaluated: (1) a full uranium-containing K West (KW) container sludge simulant consisting of nine predominant sludge components; (2) a 50:50 uranium-mole basis mixture of uraninite [U(IV)] and metaschoepite [U(VI)]. This scoping study was conducted in support of the Sludge Treatment Project (STP) Phase 2 technology evaluation for the treatment and packaging of K-Basin sludge. The STP is managed by CH2M Hill Plateau Remediation Company (CHPRC) for the U.S. Department of Energy. Warm water ({approx}95 C) oxidation of sludge, followed by immobilization, has been proposed by AREVA and is one of the alternative flowsheets being considered to convert uranium metal to UO{sub 2} and eliminate H{sub 2} generation during final sludge disposition. Preliminary assessments of warm water oxidation have been conducted, and several issues have been identified that can best be evaluated through laboratory testing. The scoping evaluation documented here was specifically focused on the issue of the potential formation of high strength sludge agglomerates at the proposed 95 C process operating temperature. Prior hydrothermal tests conducted at 185 C produced significant physiochemical changes to genuine sludge, including the formation of monolithic concretions/agglomerates that exhibited shear strengths in excess of 100 kPa (Delegard et al. 2007).

  13. Warm Water Oxidation Verification - Scoping and Stirred Reactor Tests

    International Nuclear Information System (INIS)

    Braley, Jenifer C.; Sinkov, Sergey I.; Delegard, Calvin H.; Schmidt, Andrew J.

    2011-01-01

    Scoping tests to evaluate the effects of agitation and pH adjustment on simulant sludge agglomeration and uranium metal oxidation at ∼95 C were performed under Test Instructions(a,b) and as per sections 5.1 and 5.2 of this Test Plan prepared by AREVA. (c) The thermal testing occurred during the week of October 4-9, 2010. The results are reported here. For this testing, two uranium-containing simulant sludge types were evaluated: (1) a full uranium-containing K West (KW) container sludge simulant consisting of nine predominant sludge components; (2) a 50:50 uranium-mole basis mixture of uraninite (U(IV)) and metaschoepite (U(VI)). This scoping study was conducted in support of the Sludge Treatment Project (STP) Phase 2 technology evaluation for the treatment and packaging of K-Basin sludge. The STP is managed by CH2M Hill Plateau Remediation Company (CHPRC) for the U.S. Department of Energy. Warm water (∼95 C) oxidation of sludge, followed by immobilization, has been proposed by AREVA and is one of the alternative flowsheets being considered to convert uranium metal to UO 2 and eliminate H 2 generation during final sludge disposition. Preliminary assessments of warm water oxidation have been conducted, and several issues have been identified that can best be evaluated through laboratory testing. The scoping evaluation documented here was specifically focused on the issue of the potential formation of high strength sludge agglomerates at the proposed 95 C process operating temperature. Prior hydrothermal tests conducted at 185 C produced significant physiochemical changes to genuine sludge, including the formation of monolithic concretions/agglomerates that exhibited shear strengths in excess of 100 kPa (Delegard et al. 2007).

  14. EIA scoping in England and Wales: Practitioner approaches, perspectives and constraints

    International Nuclear Information System (INIS)

    Wood, Graham; Glasson, John; Becker, Julia

    2006-01-01

    Scoping plays a critical role in shaping the nature and extent of the environmental information subsequently contained in an Environmental Impact Statement (EIS), yet it has been identified as an area of weakness in practice () and remains a poorly understood and under-researched component of EIA. This paper provides a detailed empirical investigation and assessment of recent scoping activity in England and Wales, in the context of evolving European Union (EU) regulations. Conceptual and contextual issues associated with scoping are outlined prior to the presentation of key findings, including: approaches to scoping; the assessment of significance; characteristics and influence of consultation; and perceived constraints to scoping. The paper concludes with an overview of findings, possible explanatory factors, and recommendations for future practice

  15. Voyager Interactive Web Interface to EarthScope

    Science.gov (United States)

    Eriksson, S. C.; Meertens, C. M.; Estey, L.; Weingroff, M.; Hamburger, M. W.; Holt, W. E.; Richard, G. A.

    2004-12-01

    tectonic processes are reflected in observed geophysical phenomena. Constructing maps by controlling map parameters and answering open-ended questions which describe, compare relationships, and work with both observed and model data, promote conceptual understanding of plate tectonics and related processes. The goals of curricular development emphasize inquiry, development of critical thinking skills, and student-centered interests. Custom editions of the map utility have been made as the "Jules Verne Voyager" and "Voyager Junior", for the International Lithosphere Project's "Global Strain Rate Map", and for EarthScope Education and Outreach as "EarthScope Voyager Jr.". For the latter, a number of EarthScope-specific features have been added, including locations of proposed USArray (seismic), Plate Boundary Observatory (geodetic), and San Andreas Fault Observatory at Depth sites, plus detailed maps and geographically referenced examples of EarthScope-related scientific investigations. As EarthScope develops, maps will be updated in `real time' so that students of all ages can use the data in formal and informal educational settings.

  16. FRG sealed isotopic heat sources project (C-229) project management plan

    International Nuclear Information System (INIS)

    Metcalf, I.L.

    1997-01-01

    This Project Management Plan defines the cost, scope, schedule, organizational responsibilities, and work breakdown structure for the removal of the Federal Republic of Germany (FRG) Sealed Isotopic Heat Sources from the 324 Building and placed in interim storage at the Central Waste Complex (CWC)

  17. 25 CFR 170.623 - How are IRR Program projects and activities included in a self-governance agreement?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How are IRR Program projects and activities included in a self-governance agreement? 170.623 Section 170.623 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE... self-governance agreement? To include an IRR Program project or activity in a self-governance agreement...

  18. 16 CFR 260.2 - Scope of guides.

    Science.gov (United States)

    2010-01-01

    ... through any other means, including marketing through digital or electronic means, such as the Internet or... ENVIRONMENTAL MARKETING CLAIMS § 260.2 Scope of guides. (a) These guides apply to environmental claims included in labeling, advertising, promotional materials and all other forms of marketing, whether asserted...

  19. πScope: Python based scientific workbench with MDSplus data visualization tool

    Energy Technology Data Exchange (ETDEWEB)

    Shiraiwa, S., E-mail: shiraiwa@PSFC.MIT.EDU; Fredian, T.; Hillairet, J.; Stillerman, J.

    2016-11-15

    Highlights: • πScope provides great enhancement in MDSplus data visualization. • πScope provides a single platform for both data browsing and complicated analysis. • πScope is scriptable and easily expandable due to its object oriented. • πScope is written in python and available from (http://piscope.psfc.mit.edu/). - Abstract: A newly developed python based scientific data analysis and visualization tool, πScope ( (http://piscope.psfc.mit.edu)), is reported. The primary motivation is 1) to provide an updated tool to browse the MDSplus data beyond existing dwscope/jScope and 2) to realize a universal foundation to construct interface tools to perform computer modeling from experimental data. To visualize MDSplus data, πScope has many features including overplotting different signals and discharges, generating various plot types (line, contour, image, etc.), performing in-panel data analysis using python scripts, and producing publication quality graphics. The logic to generate multi-panel plots is designed to be backward compatible with dwscope, enabling smooth migration for users. πScope uses multi-threading in data loading, and is easy to modify and expand due to its object-oriented design. Furthermore, A user can access the data structure both from a GUI and a script, enabling relatively complex data analysis workflow built quickly on πScope.

  20. πScope: Python based scientific workbench with MDSplus data visualization tool

    International Nuclear Information System (INIS)

    Shiraiwa, S.; Fredian, T.; Hillairet, J.; Stillerman, J.

    2016-01-01

    Highlights: • πScope provides great enhancement in MDSplus data visualization. • πScope provides a single platform for both data browsing and complicated analysis. • πScope is scriptable and easily expandable due to its object oriented. • πScope is written in python and available from (http://piscope.psfc.mit.edu/). - Abstract: A newly developed python based scientific data analysis and visualization tool, πScope ( (http://piscope.psfc.mit.edu)), is reported. The primary motivation is 1) to provide an updated tool to browse the MDSplus data beyond existing dwscope/jScope and 2) to realize a universal foundation to construct interface tools to perform computer modeling from experimental data. To visualize MDSplus data, πScope has many features including overplotting different signals and discharges, generating various plot types (line, contour, image, etc.), performing in-panel data analysis using python scripts, and producing publication quality graphics. The logic to generate multi-panel plots is designed to be backward compatible with dwscope, enabling smooth migration for users. πScope uses multi-threading in data loading, and is easy to modify and expand due to its object-oriented design. Furthermore, A user can access the data structure both from a GUI and a script, enabling relatively complex data analysis workflow built quickly on πScope.

  1. Conceptual design report for tank farm restoration and safe operations, project W-314

    Energy Technology Data Exchange (ETDEWEB)

    Briggs, S.R., Westinghouse Hanford

    1996-05-02

    This Conceptual Design Report (CDR) presents the conceptual level design approach that satisfies the established technical requirements for Project W-314, `Tank Farm Restoration and Safe Operations.` The CDR also addresses the initial cost and schedule baselines for performing the proposed Tank Farm infrastructure upgrades. The scope of this project includes capital improvements to Hanford`s existing tank farm facilities(primarily focused on Double- Shell Tank Farms) in the areas of instrumentation/control, tank ventilation, waste transfer, and electrical systems.

  2. Tritium Facilities Modernization and Consolidation Project Process Waste Assessment (Project S-7726)

    International Nuclear Information System (INIS)

    Hsu, R.H.; Oji, L.N.

    1997-01-01

    Under the Tritium Facility Modernization ampersand Consolidation (TFM ampersand C) Project (S-7726) at the Savannah River Site (SS), all tritium processing operations in Building 232-H, with the exception of extraction and obsolete/abandoned systems, will be reestablished in Building 233-H. These operations include hydrogen isotopic separation, loading and unloading of tritium shipping and storage containers, tritium recovery from zeolite beds, and stripping of nitrogen flush gas to remove tritium prior to stack discharge. The scope of the TFM ampersand C Project also provides for a new replacement R ampersand D tritium test manifold in 233-H, upgrading of the 233- H Purge Stripper and 233-H/234-H building HVAC, a new 234-H motor control center equipment building and relocating 232-H Materials Test Facility metallurgical laboratories (met labs), flow tester and life storage program environment chambers to 234-H

  3. Identification of critical factors affecting flexibility in hospital construction projects.

    Science.gov (United States)

    Olsson, Nils E O; Hansen, Geir K

    2010-01-01

    This paper analyzes the dynamics relating to flexibility in a hospital project context. Three research questions are addressed: (1) When is flexibility used in the life cycle of a project? (2) What are the stakeholders' perspectives on project flexibility? And (3) What is the nature of the interaction between flexibility in the process of a project and flexibility in terms of the characteristics of a building? Flexibility is discussed from both a project management point of view and from a hospital architecture perspective. Flexibility in project life cycle and from a stakeholder perspective is examined, and the interaction between flexibility in scope lock-in and building flexibility is investigated. The results are based on case studies of four Norwegian hospital projects. Information relating to the projects has been obtained from evaluation reports, other relevant documents, and interviews. Observations were codified and analyzed based on selected parameters that represent different aspects of flexibility. One of the cases illustrates how late changes can have a significant negative impact on the project itself, contributing to delays and cost overruns. Another case illustrates that late scope lock-in on a limited part of the project, in this case related to medical equipment, can be done in a controlled manner. Project owners and users appear to have given flexibility high priority. Project management teams are less likely to embrace changes and late scope lock-in. Architects and consultants are important for translating program requirements into physical design. A highly flexible building did not stop some stakeholders from pushing for significant changes and extensions during construction.

  4. Something of value Governance of Projects in the Project-Based Organisation

    DEFF Research Database (Denmark)

    Riis, Eva

    2013-01-01

    The paper presents a conceptual framework for studying Governance of Projects and issues of value in the project-based organisation. Attempts at exploring and conceptualising the issues in the current literature are reviewed. Issues pertinent to gaining value by Governance of Projects have mainly...... for a better understanding of Governance of Projects and value contribution. The findings presented here form the conceptual foundation for subsequent empirical studies of value by Governance of Projects....... been explored from the perspective of economic theory. Models found in the literature are not typically concerned with value for the implementing organisation as a whole; their scope is limited to the time just after project completion. No valid, empirically-based models of value creation by Governance...

  5. Evaluating Tobacco Control Policies in 28 Countries (including 9 EU countries: The ITC Project

    Directory of Open Access Journals (Sweden)

    Geoffrey Fong

    2016-03-01

    Full Text Available Since its start in 2002, the ITC Project has been conducting evaluation studies of tobacco control policies via prospective cohort surveys of tobacco users in 28 countries, including 9 EU countries. This presentation will focus on the design of the ITC Project and how it differs from and complements existing evidence-gathering systems (monitoring and surveillance systems in measuring and understanding the impact of FCTC policies. The presentation will also describe the ITC Project's most recent initiatives: (1 the EUREST-PLUS study focusing on measuring the impact of the Tobacco Products Directive, and (2 a large-scale international cohort study of e-cigarettes starting in the United States, Canada, England, and Australia.

  6. The SCOPE Mission

    International Nuclear Information System (INIS)

    Fujimoto, M.; Tsuda, Y.; Saito, Y.; Shinohara, I.; Takashima, T.; Matsuoka, A.; Kojima, H.; Kasaba, Y.

    2009-01-01

    In order to reach the new horizon of the space physics research, the Plasma Universe, via in-situ measurements in the Earth's magnetosphere, SCOPE will perform formation flying observations combined with high-time resolution electron measurements. The simultaneous multi-scale observations by SCOPE of various plasma dynamical phenomena will enable data-based study of the key space plasma processes from the cross-scale coupling point of view. Key physical processes to be studied are magnetic reconnection under various boundary conditions, shocks in space plasma, collisionless plasma mixing at the boundaries, and physics of current sheets embedded in complex magnetic geometries. The SCOPE formation is made up of 5 spacecraft and is put into the equatorial orbit with the apogee at 30 Re (Re: earth radius). One of the spacecraft is a large mother ship which is equipped with a full suite of particle detectors including ultra-high time resolution electron detector. Among other 4 small spacecraft, one remains near (∼10 km) the mother ship and the spacecraft-pair will focus on the electron-scale physics. Others at the distance of 100∼3000 km(electron∼ion spatial scales) from the mother ship will monitor plasma dynamics surrounding the mother-daughter pair. There is lively on-going discussion on Japan-Europe international collaboration (ESA's Cross-Scale), which would certainly make better the coverage over the scales of interest and thus make the success of the mission, i.e., clarifying the multi-scale nature of the Plasma Universe, to be attained at an even higher level.

  7. Multimillion Dollar Construction Project Completed in Glenn's Icing Research Tunnel

    Science.gov (United States)

    Kevdzija, Susan L.

    2001-01-01

    Over the last year, the Glenn Research Center's Icing Research Tunnel (IRT) underwent a major $5.2 million rehabilitation project as part of the Construction of Facilities program. The scope of the project included redesign and replacement of the 55-yr-old heat exchanger, the addition of fan outlet guide vanes for flow conditioning downstream of the 25-ft-diameter fan, and redesign and replacement of the C and D corner-turning vanes. The purpose of the rehabilitation was to replace old portions of the infrastructure and to improve the aerodynamic flow quality in the tunnel.

  8. 29 CFR 780.150 - Scope and limits of “preparation for market.”

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Scope and limits of âpreparation for market.â 780.150... STANDARDS ACT General Scope of Agriculture Preparation for Market § 780.150 Scope and limits of “preparation for market.” “Preparation for market” is also named as one of the practices which may be included in...

  9. Public project success as seen in a broad perspective.: Lessons from a meta-evaluation of 20 infrastructure projects in Norway.

    Science.gov (United States)

    Volden, Gro Holst

    2018-08-01

    Infrastructure projects in developed countries are rarely evaluated ex-post. Despite their number and scope, our knowledge about their various impacts is surprisingly limited. The paper argues that such projects must be assessed in a broad perspective that includes both operational, tactical and strategic aspects, and unintended as well as intended effects. A generic six-criteria evaluation framework is suggested, inspired by a framework frequently used to evaluate development assistance projects. It is tested on 20 Norwegian projects from various sectors (transport, defence, ICT, buildings). The results indicate that the majority of projects were successful, especially in operational terms, possibly because they underwent external quality assurance up-front. It is argued that applying this type of standardized framework provides a good basis for comparison and learning across sectors. It is suggested that evaluations should be conducted with the aim of promoting accountability, building knowledge about infrastructure projects, and continuously improve the tools, methods and governance arrangements used in the front-end of project development. Copyright © 2018 The Author. Published by Elsevier Ltd.. All rights reserved.

  10. LogScope

    Science.gov (United States)

    Havelund, Klaus; Smith, Margaret H.; Barringer, Howard; Groce, Alex

    2012-01-01

    LogScope is a software package for analyzing log files. The intended use is for offline post-processing of such logs, after the execution of the system under test. LogScope can, however, in principle, also be used to monitor systems online during their execution. Logs are checked against requirements formulated as monitors expressed in a rule-based specification language. This language has similarities to a state machine language, but is more expressive, for example, in its handling of data parameters. The specification language is user friendly, simple, and yet expressive enough for many practical scenarios. The LogScope software was initially developed to specifically assist in testing JPL s Mars Science Laboratory (MSL) flight software, but it is very generic in nature and can be applied to any application that produces some form of logging information (which almost any software does).

  11. Sustainable childhood obesity prevention through community engagement (SCOPE) program: evaluation of the implementation phase.

    Science.gov (United States)

    McIntosh, Bonnie; Daly, Amelia; Mâsse, Louise C; Collet, Jean-Paul; Higgins, Joan Wharf; Naylor, Patti-Jean; Amed, Shazhan

    2015-10-01

    Childhood obesity rates are steadily rising. Sustainable Childhood Obesity Prevention Through Community Engagement (SCOPE) is a community-based participatory action research (PAR) program aimed at preventing childhood obesity. This study aimed to describe community perspectives on, and elicit feedback about, SCOPE's first phase of implementation in two pilot cities in British Columbia, Canada. A case study was implemented using interviews and questionnaires to obtain feedback about SCOPE from two groups: SCOPE coordinators and stakeholders (i.e., individuals and organizations that were a member of the community and engaged with SCOPE coordinators). Participants were recruited via email and (or) by telephone. Coordinators completed a telephone interview. Stakeholders completed a questionnaire and (or) a telephone interview. Thematic analysis was conducted. Participants included 2 coordinators and 15 stakeholders. Participants similarly interpreted SCOPE as a program focused on raising awareness about childhood obesity prevention, while engaging multiple community sectors. Overall, participants valued the program's role in facilitating networking and partnership development, providing evidence-based resources, technical expertise, and contributing funding. Participants felt that SCOPE is sustainable. However, participants felt that barriers to achieving healthy weights among children included those related to the built environment, and social, behavioral, and economic obstacles. Perspectives on factors that facilitated and acted as barriers to SCOPE's first phase of implementation were obtained from the SCOPE communities and may be used to enhance the sustainability of SCOPE and its applicability to other BC communities.

  12. Including the smoking epidemic in internationally coherent mortality projections

    NARCIS (Netherlands)

    Janssen, Fanny; van Wissen, Leo J. G.; Kunst, Anton E.

    2013-01-01

    We present a new mortality projection methodology that distinguishes smoking- and non-smoking-related mortality and takes into account mortality trends of the opposite sex and in other countries. We evaluate to what extent future projections of life expectancy at birth (e 0) for the Netherlands up

  13. Including the smoking epidemic in internationally coherent mortality projections

    NARCIS (Netherlands)

    Janssen, Fanny; van Wissen, Leo J. G.; Kunst, Anton E.

    We present a new mortality projection methodology that distinguishes smoking- and non-smoking-related mortality and takes into account mortality trends of the opposite sex and in other countries. We evaluate to what extent future projections of life expectancy at birth (e (0)) for the Netherlands up

  14. A scoping review of online repositories of quality improvement projects, interventions and initiatives in healthcare.

    Science.gov (United States)

    Bytautas, Jessica P; Gheihman, Galina; Dobrow, Mark J

    2017-04-01

    Quality improvement (QI) is becoming an important focal point for health systems. There is increasing interest among health system stakeholders to learn from and share experiences on the use of QI methods and approaches in their work. Yet there are few easily accessible, online repositories dedicated to documenting QI activity. We conducted a scoping review of publicly available, web-based QI repositories to (i) identify current approaches to sharing information on QI practices; (ii) categorise these approaches based on hosting, scope and size, content acquisition and eligibility, content format and search, and evaluation and engagement characteristics; and (iii) review evaluations of the design, usefulness and impact of their online QI practice repositories. The search strategy consisted of traditional database and grey literature searches, as well as expert consultation, with the ultimate aim of identifying and describing QI repositories of practices undertaken in a healthcare context. We identified 13 QI repositories and found substantial variation across the five categories. The QI repositories used different terminology (eg, practices vs case studies) and approaches to content acquisition, and varied in terms of primary areas of focus. All provided some means for organising content according to categories or themes and most provided at least rudimentary keyword search functionality. Notably, none of the QI repositories included evaluations of their impact. With growing interest in sharing and spreading best practices and increasing reliance on QI as a key contributor to health system performance, the role of QI repositories is likely to expand. Designing future QI repositories based on knowledge of the range and type of features available is an important starting point for improving their usefulness and impact. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  15. AuScope research infrastructure - supporting Australian mineral discovery

    Science.gov (United States)

    McInnes, B.; Rawling, T.

    2016-12-01

    Earth and geospatial scientists are heavy users of data products. When industry geologists access spatial data from the field and the exploration office they require data products that are discoverable, searchable, interoperable and attributed with robust metadata. Over the last decade AuScope has utilised NCRIS funding to provide a variety of data products including geophysical data (reflection and passive seismic, magnetotellurics and gravity), GIS layers from state and national geological survey organisations, hyperspectral core logging (National Virtual Core Library) and time-series geospatial data from GNSS and VLBI instruments - all delivered using AuScope GRID technologies based on the Spatial Information Services Stack (SiSS). Perhaps one of the best examples of collaboration to deliver data products to industry users is the National Mineral Library. Working with researchers at Curtin Universities John de Laeter Centre and ANDS, AuScope has also supported the development of a Laboratory Information Management System (LIMS). The project has produced an entirely new workflow, based around a TESCAN TIMA field emission scanning electron microscope, that allows metadata to be collected and recorded from the sample collection and preparation right through to data delivery and publication. This process has facilitated the scanning of a large stockpile of mineral samples from across Western Australia that will produce a state-wide Mineral Library, allowing mineral explorers to better understand the composition of critical rock outcrop samples from all over the state. This new NCRIS supported initiative provides a dataset that underpins both academic and applied research programs and is important for the economic future of Australia. Mining companies do a lot of heavy mineral analysis in research and development but, because there isn't a baseline for mineralogy across each state, it is difficult to have full confidence in the heavy mineral data. This creates an

  16. Including the smoking epidemic in internationally coherent mortality projections

    NARCIS (Netherlands)

    Janssen, F.; van Wissen, L.J.G.; Kunst, A.E.

    2013-01-01

    We present a new mortality projection methodology that distinguishes smoking- and non-smoking-related mortality and takes into account mortality trends of the opposite sex and in other countries. We evaluate to what extent future projections of life expectancy at birth (e0) for the Netherlands up to

  17. 40 CFR 262.103 - What is the scope of the laboratory environmental management standard?

    Science.gov (United States)

    2010-07-01

    ... environmental management standard? 262.103 Section 262.103 Protection of Environment ENVIRONMENTAL PROTECTION... University Laboratories XL Project-Laboratory Environmental Management Standard § 262.103 What is the scope of the laboratory environmental management standard? The Laboratory Environmental Management Standard...

  18. RBMK full scope simulator gets virtual refuelling machine

    International Nuclear Information System (INIS)

    Khoudiakov, M.; Slonimsky, V.; Mitrofanov, S.

    2006-01-01

    The paper describes a continuation of efforts of an international Russian-Norwegian joint team to drastically increase operational safety during the refuelling process of an RBMK-type reactor by implementing a training simulator based on an innovative Virtual Reality (VR) approach. During the preceding stage of the project a display-based simulator was extended with VR models of the real Refueling Machine (RM) and its environment in order to improve both the learning process and operation's effectiveness. The simulator's challenge is to support the performance (operational activity) of RM operational staff firstly and to take major part in developing basic knowledge and skills as well as to keep skilled staff in close touch with the complex machinery of the Refueling Machine. At the given 2nd stage the functional scope of the VR-simulator was greatly enhanced - firstly, by connecting to the RBMK-unit full-scope simulator, and, secondly, by a training program and simulator model upgrade. (author)

  19. Rehabilitation and modernization project of units 1 and 2 of Laguna Verde Nuclear Power Plant. A strengthening project to 120%. (2nd phase); Proyecto de rehabilitacion y modernizacion de las Unidades 1and 2 de la CNLV. Un proyecto de reponteciacion al 120% (2ª Fase)

    Energy Technology Data Exchange (ETDEWEB)

    Liebana, B.; Merino, A.; Garcia, J. L.; Gomez, M.; Martinez, I.; Ruiz, L.

    2010-07-01

    The power increase of the Laguna Verde Nuclear Power Plant is a project for the rehabilitation and modernization of the turbo and associated equipment to get an increase of its power and of its service life. The project scope includes the design, the engineering, the equipment supply, the installation, the testing and the commissioning. This article presents the work of the second phase.

  20. Transition plan: Project C-018H, 200-E Area Effluent Treatment Facility

    International Nuclear Information System (INIS)

    Connor, M.D.

    1994-01-01

    The purpose of this transition plan is to ensure an orderly transfer of project information to operations to satisfy Westinghouse Hanford Company (WHC) operational requirements and objectives, and ensure safe and efficient operation of Project C-018H, the 200-E Area Effluent Treatment Facility (ETF). This plan identifies the deliverables for Project C-018H upon completion of construction and turnover to WHC for operations, and includes acceptance criteria to objectively assess the adequacy of the contract deliverables in relation to present requirements. The scope of this plan includes a general discussion of the need for complete and accurate design basis documentation and design documents as project deliverables. This plan also proposes that a configuration management plan be prepared to protect and control the transferred design documents and reconstitute the design basis and design requirements, in the event that the deliverables and project documentation received from the contractor are less than adequate at turnover

  1. Correlational Study of Risk Management and Information Technology Project Success

    Science.gov (United States)

    Gillespie, Seth J.

    2014-01-01

    Many IT projects fail despite the best efforts to keep these projects within budget, schedule, and scope. Few studies have looked at the effect of project risk management tools and techniques on project success. The primary focus of this study was to examine the extent to which utilization of project risk management processes influence project…

  2. The role of Facilities in Engaging and Informing the Public of EarthScope Science

    Science.gov (United States)

    Charlevoix, D. J.; Taber, J. J.; Berg, M.; Dorr, P. M.; McQuillan, P.; Olds, S. E.

    2013-12-01

    The IRIS and UNAVCO facilities play an important role in support of EarthScope through joint and independent education and outreach activities. These activities are focused on providing data and data products to a wide range of audiences, disseminating EarthScope science results through formal and informal venues, and informing the public of the broader impacts of EarthScope. The facilities are particularly well-suited for sustained engagement of multiple audiences over the decade-long course of EarthScope. One such example of a long-term effort was the Transportable Array student siting program, where over an 8 year period, students from about 55 institutions across the US and Canada conducted site reconnaissance and talked to landowners about EarthScope. Another activity focused on students was the development of a student intern program to support field engineering efforts during the construction of the Plate Boundary Observatory. Other ongoing activities include developing and maintaining relationships with media representatives and annual training of National Parks staff throughout the western U.S. The UNAVCO-IRIS partnership has been particularly valuable for EarthScope-related activities, where UNAVCO and IRIS work closely with the EarthScope National Office (ESNO) to bring EarthScope science to national, regional and local audiences within the EarthScope footprint. Collaborations have ranged across each group's products and services, including: EarthScope-focused teacher workshops, participation in EarthScope interpretive workshops for informal educators (led by ESNO), development of content for the IRIS Active Earth Monitor, preparing PBO-, USArray- and EarthScope-focused materials on topics such as Episodic Tremor and Slip for wider distribution through print, web, and mobile information technologies, and organizing research experiences for undergraduates on EarthScope-related topics. Other collaborations have focused on social media, and the development

  3. Managing Risk and Uncertainty in Large-Scale University Research Projects

    Science.gov (United States)

    Moore, Sharlissa; Shangraw, R. F., Jr.

    2011-01-01

    Both publicly and privately funded research projects managed by universities are growing in size and scope. Complex, large-scale projects (over $50 million) pose new management challenges and risks for universities. This paper explores the relationship between project success and a variety of factors in large-scale university projects. First, we…

  4. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  5. An Assessment of risk response strategies practiced in software projects

    Directory of Open Access Journals (Sweden)

    Vanita Bhoola

    2014-11-01

    Full Text Available Risk management and success in projects are highly intertwined – better approaches to project risk management tend to increase chances of project success in terms of achieving scope & quality, schedule and cost targets. The process of responding to risk factors during a project’s life cycle is a crucial aspect of risk management referred to as risk response strategies, in this paper. The current research explores the status of risk response strategies applied in the software development projects in India. India provides a young IT-savvy English-speaking population, which is also cost effective. Other than the workforce, the environment for implementation of software projects in India is different from the matured economies. Risk management process is a commonly discussed theme, though its implementation in practice has a huge scope for improvement in India. The paper talks about four fundamental treatments to risk response – Avoidance, Transference, Mitigation and Acceptance (ATMA. From a primary data of 302 project managers, the paper attempts to address the risk response factors that lead to successful achievement of project scope & quality, schedule and cost targets, by using a series of regressions followed with Seemingly Unrelated Regression Equations (SURE modelling. Mitigation emerged as the most significant risk response strategy to achieve project targets. Acceptance, transference, and avoidance of risk were mostly manifested in the forms of transparency in communication across stakeholders, careful study of the nature of risks and close coordination between project team, customers/end-users and top management.

  6. 48 CFR 239.7100 - Scope of subpart.

    Science.gov (United States)

    2010-10-01

    ... OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Security and Privacy for Computer Systems 239.7100 Scope of subpart. This subpart includes information assurance and... protection of privacy of individuals (see FAR Subpart 24.1). ...

  7. Software engineering beyond the project

    DEFF Research Database (Denmark)

    Dittrich, Yvonne

    2014-01-01

    Context The main part of software engineering methods, tools and technologies has developed around projects as the central organisational form of software development. A project organisation depends on clear bounds regarding scope, participants, development effort and lead-time. What happens when...... of traditional software engineering, but makes perfect sense, considering that the frame of reference for product development is not a project but continuous innovation across the respective ecosystem. The article provides a number of concrete points for further research....

  8. Training for Quality: Improving Early Childhood Programs through Systematic Inservice Training. Monographs of the High/Scope Educational Research Foundation, Number Nine.

    Science.gov (United States)

    Epstein, Ann S.

    The Training of Trainers (ToT) Evaluation investigated the efficacy of the High/Scope model for improving the quality of early childhood programs on a national scale. To address this question, the High/Scope Foundation undertook a multimethod evaluation that collected anecdotal records from the consultants and 793 participants in 40 ToT projects,…

  9. A Study on Site Selecting for National Project including High Level Radioactive Waste Disposal

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kilyoo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    Many national projects are stopped since sites for the projects are not determined. The sites selections are hold by NIMBY for unpleasant facilities or by PYMFY for preferable facilities among local governments. The followings are the typical ones; NIMBY projects: high level radioactive waste disposal, THAAD, Nuclear power plant(NPP), etc. PIMFY projects: South-east new airport, KTX station, Research center for NPP decommission, etc. The site selection for high level radioactive waste disposal is more difficult problem, and thus government did not decide and postpone to a dead end street. Since it seems that there is no solution for site selection for high level radioactive waste disposal due to NIMBY among local governments, a solution method is proposed in this paper. To decide a high level radioactive waste disposal, the first step is to invite a bid by suggesting a package deal including PIMFY projects such as Research Center for NPP decommission. Maybe potential host local governments are asked to submit sealed bids indicating the minimum compensation sum that they would accept the high level radioactive waste disposal site. If there are more than one local government put in a bid, then decide an adequate site by considering both the accumulated PESS point and technical evaluation results. By considering how fairly preferable national projects and unpleasant national projects are distributed among local government, sites selection for NIMBY or PIMFY facilities is suggested. For NIMBY national projects, risk, cost benefit analysis is useful and required since it generates cost value to be used in the PESS. For many cases, the suggested method may be not adequate. However, similar one should be prepared, and be basis to decide sites for NIMBY or PIMFY national projects.

  10. Implementation plan for the programmatic environmental impact statement for the Department of Energy UMTRA Ground Water Project

    International Nuclear Information System (INIS)

    1994-04-01

    Under the Uranium Mill Tailings Remedial Action (UMTRA) Project, the U.S. Department of Energy (DOE) is cleaning up contamination to protect human health and the environment at 24 inactive uranium processing sites located in 10 states. Five of the sites are either on or near Native American lands. The UMTRA Project is divided into two projects: Surface and Ground Water. On November 18, 1992, the DOE issued a notice of intent (57 FR 54374, 1992) to prepare a programmatic environmental impact statement (PEIS) for the UMTRA Ground Water Project. The PEIS will result in a record of decision that will determine how the UMTRA Ground Water Project will address ground water contamination resulting from milling operations at the UMTRA Project processing sites. DOE regulations (10 CFR section 1021.312) require that an implementation plan be prepared to provide guidance for preparing a PEIS and to record the results of the scoping process. This implementation plan describes and records the results of the PEIS scoping process; summarizes comments received and their disposition; describes the purpose of and need for agency action, the proposed action, and alternatives; lists alternatives considered and eliminated from review; identifies cooperating agencies, their roles, and responsibilities; provides a draft PEIS outline, which includes the planned PEIS scope and content (Attachment A); and provides a schedule for the PEIS process. This plan will be placed in the UMTRA Project libraries listed in Attachment B. The PEIS will identify and evaluate the potential impacts associated with alternatives for conducting the UMTRA Ground Water Project. The PEIS will not assess site-specific impacts; site-specific impacts must be analyzed in separate National Environmental Policy Act (NEPA) documents that will tier off the PEIS. This tiering process will streamline the preparation of site-specific NEPA documents

  11. Seneca Compressed Air Energy Storage (CAES) Project

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2012-11-30

    of the designs would perform acceptably. Their general scope of work included development of detailed project construction schedules, capital cost and cash flow estimates for both CAES cycles, and development of detailed operational data, including fuel and compression energy requirements, to support dispatch modeling for the CAES cycles. The Dispatch Modeling Consultant selected for this project was Customized Energy Solutions (CES). Their general scope of work included development of wholesale electric and gas market price forecasts and development of a dispatch model specific to CAES technologies. Parsons Brinkerhoff Energy Storage Services (PBESS) was retained to develop an air storage cavern and well system design for the CAES project. Their general scope of work included development of a cavern design, solution mining plan, and air production well design, cost, and schedule estimates for the project. Detailed Front End Engineering Design (FEED) during Phase 1 of the project determined that CAES plant capital equipment costs were much greater than the $125.6- million originally estimated by EPRI for the project. The initial air storage cavern Design Basis was increased from a single five million cubic foot capacity cavern to three, five million cubic foot caverns with associated air production wells and piping. The result of this change in storage cavern Design Basis increased project capital costs significantly. In addition, the development time required to complete the three cavern system was estimated at approximately six years. This meant that the CAES plant would initially go into service with only one third of the required storage capacity and would not achieve full capability until after approximately five years of commercial operation. The market price forecasting and dispatch modeling completed by CES indicated that the CAES technologies would operate at only 10 to 20% capacity factors and the resulting overall project economics were not favorable for

  12. Groundwater/Vadose Zone Integration Project Management Plan

    International Nuclear Information System (INIS)

    Hughes, M. C.

    1999-01-01

    This Project Management Plan (PMP) defines the authorities, roles, and responsibilities of the US Department of Energy (DOE), Richland Operations Office (RL) and those contractor organizations participating in the Hanford Site' s Groundwater/Vadose Zone (GW/VZ) Integration Project. The PMP also describes the planning and control systems, business processes, and other management tools needed to properly and consistently conduct the Integration Project scope of work

  13. Lake Charles CCS Project

    Energy Technology Data Exchange (ETDEWEB)

    Leib, Thomas [Leucadia Energy, LLC, Salt Lake City, UT (United States); Cole, Dan [Denbury Onshore, LLC, Plano, TX (United States)

    2015-06-30

    In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture and Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO2) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO2 generated in a large industrial gasification process and sequester the CO2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials

  14. 32 CFR 989.18 - Scoping.

    Science.gov (United States)

    2010-07-01

    ... ANALYSIS PROCESS (EIAP) § 989.18 Scoping. (a) After publication of the NOI for an EIS, the EPF must... public. The result of scoping is that the proponent and EPF determine the range of actions, alternatives, and impacts to be considered in the EIS (40 CFR 1508.25). The EPF must send scripts for scoping...

  15. Pacific Northwest National Laboratory Apatite Investigation at the 100-NR-2 Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-03-28

    This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by staff working on the 100-NR-2 Apatite Project. The U.S. Department of Energy, Fluor Hanford, Inc., Pacific Northwest National Laboratory, and the Washington Department of Ecology agreed that the long-term strategy for groundwater remediation at 100-N would include apatite sequestration as the primary treatment, followed by a secondary treatment. The scope of this project covers the technical support needed before, during, and after treatment of the targeted subsurface environment using a new high-concentration formulation.

  16. 45 CFR 73b.1 - Scope.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Scope. 73b.1 Section 73b.1 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION DEBARMENT OR SUSPENSION OF FORMER EMPLOYEES... officer or employee of the Department, including former and retired officers of the commissioned corps of...

  17. Scoping Study. Linking RE Promotion Policies with International Carbon Trade (LINK)

    Energy Technology Data Exchange (ETDEWEB)

    Castro, Paula; Hayashi, Daisuke; Kristiansen, Kjell Olav; Michaelowa, Axel; Stadelmann, Martin

    2011-06-15

    Implementing national policies may threaten the eligibility of renewable energy projects for Clean Development Mechanism/Joint Implementation (CDM/JI), thus reducing international development financing. Countries hence need to be very careful when crafting their national promotion policies. The objectives of the Renewable Energy Technology Deployment (IEA-RETD) project were to perform a scoping study on the interplay between national Renewable Energy (RE) promotion policies and international carbon trade. The study summarizes the ongoing discussion, describes the main barriers that may hinder -- or at least not sufficiently support -- the implementation of national RE promotion policies, and provides suggestions for removing these barriers.

  18. Joint implementation demo project between Denmark and Estonia - Phase 1. Final report

    International Nuclear Information System (INIS)

    2003-09-01

    This project is meant to contribute to form the basis of co-operation between Denmark and Estonia as regards Joint Implementation (JI) and thus gather experience in preparation for practical use of JI. A number of questions can be raised for discussion within this project: What is the scope for JI? What is the role of the host country government? Will JI survive the emerging Emission Trading? The project report gives a status of the present situation within the area of JI both internationally and in Estonia, including a resume of the Estonian National Climate Programme. Furthermore, a stakeholder analysis is presented, along with an illustration of the effect of Joint Implementation in the various energy sectors. (BA)

  19. Scoping Meeting Summary , Pahoa, Hawai'i, March 1992, 2 PM Session

    Energy Technology Data Exchange (ETDEWEB)

    Quinby-Hunt, Mary S.

    1992-06-08

    The meeting began with presentations by the facilitator, Mr. Spiegel, and the representative from DOE, Dr. Lewis. The facilitator introduced those on the podium. He then described the general structure of the meeting and its purpose: to hear the issues and concerns of those present regarding the proposed Hawaiian Geothermal Project. He described his role as assuring the impartiality and fairness of the meeting. Dr. Lewis of DOE further defined the scope of the project, introduced those of the EIS team present and briefly described the EIS process.

  20. Co-benefits of including CCS projects in the CDM in India's power sector

    International Nuclear Information System (INIS)

    Eto, R.; Murata, A.; Uchiyama, Y.; Okajima, K.

    2013-01-01

    This study examines the effects of the inclusion of the co-benefits on the potential installed capacity of carbon dioxide capture and storage (CCS) projects with a linear programming model by the clean development mechanism (CDM) in India's power sector. It is investigated how different marginal damage costs of air pollutants affect the potential installed capacity of CCS projects in the CDM with a scenario analysis. Three results are found from this analysis. First, large quantity of IGCC with CCS becomes realizable when the certified emission reduction (CER) prices are above US$56/tCO 2 in the integrated Northern, Eastern, Western, and North-Eastern regional grids (NEWNE) and above US $49/tCO 2 in the Southern grid. Second, including co-benefits contributes to decrease CO 2 emissions and air pollutants with introduction of IGCC with CCS in the CDM at lower CER prices. Third, the effects of the co-benefits are limited in the case of CCS because CCS reduces larger amount of CO 2 emissions than that of air pollutants. Total marginal damage costs of air pollutants of US$250/t and US$200/t lead to CER prices of US$1/tCO 2 reduction in the NEWNE grid and the Southern grid. - Highlights: • We estimate effects of co-benefits on installed capacity of CCS projects in the CDM. • We develop a linear programming (LP) model of two grids of India. • Including co-benefits contributes to introduce IGCC with CCS in the CDM at lower CER prices

  1. Full-scope nuclear training simulator -brought to the desktop

    International Nuclear Information System (INIS)

    LaPointe, D.J.; Manz, A.; Hall, G.S.

    1997-01-01

    RighTSTEP is a suite of simulation software which has been initially designed to facilitate upgrade of Ontario Hydro's full-scope simulators, but is also adaptable to a variety of other roles. it is presently being commissioned at Bruch A Training Simulator and has seen preliminary use in desktop and classroom roles. Because of the flexibility of the system, we anticipate it will see common use in the corporation for full-scope simulation roles. A key reason for developing RighTSTEP (Real Time Simulator Technology Extensible and Portable) was the need to modernize and upgrade the full-scope training simulator while protecting the investment in modelling code. This modelling code represents the end product of 18 years of evolution from the beginning of its development in 1979. Bringing this modelling code to a modern and more useful framework - the combination of simulator host, operating system, and simulator operating system - also could provide many spin-off benefits. The development (and first implementation) of the righTSTEP system was cited for saving the corporation 5.6M$ and was recognized by a corporate New Technology Award last year. The most important spin-off from this project has been the desktop version of the full-scope simulator. The desktop simulator uses essentially the same software as does its full-scope counterpart, and may be used for a variety of new purposes. Classroom and individual simulator training can now be easily accommodated since a desktop simulator is both affordable and relatively ease to use. Further, a wide group of people can be trained using the desktop simulator: by contrast the full-scope simulators were almost exclusively devoted to front-line operating staff. The desktop is finding increasing use in support of engineering applications, resulting from its easy accessibility, breadth of station systems represented, and tools for analysis and viewing. As further plant models are made available on the new simulator platform and

  2. 48 CFR 39.000 - Scope of part.

    Science.gov (United States)

    2010-10-01

    ... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY 39.000 Scope of part. This part prescribes acquisition policies and procedures for use in acquiring— (a) Information technology, including financial management systems, consistent with other parts of this regulation, OMB Circular No. A-127, Financial Management...

  3. How to scope configuration projects and manage the knowledge they require

    DEFF Research Database (Denmark)

    Shafiee, Sara; Kristjansdottir, Katrin; Hvam, Lars

    2018-01-01

    Purpose This paper aims to explore the use of the knowledge management (KM) perspective for configuration projects. Configuration projects implement configurators as information technology systems that help companies manage the specification process of customised products. An effective method...... of retrieving and formalising knowledge for configurators is essential, because it can reduce the risk of unsuccessful implementation and the time and effort required for development. Unfortunately, no standard KM frameworks are available specifically for configuration projects. This study identifies...... the knowledge necessary for different phases of a configuration project (which knowledge, for what purpose and from what sources), examines how it is transformed during a configuration project (what KM activities and tools are used) and establishes how the knowledge can be documented for future maintenance...

  4. Lifecycle baseline summary for ADS 6504IS isotopes facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-08-01

    The scope of this Activity Data Sheet (ADS) is to provide a detailed plan for the Isotopes Facilities Deactivation Project (IFDP) at the Oak Ridge National Laboratory (ORNL). This project places the former isotopes production facilities in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S ampersand M) until the facilities are included in the Decontamination and Decommissioning (D ampersand D) Program. The facilities included within this deactivation project are Buildings 3026-C, 3026-D, 3028, 3029, 3038-AHF, 3038-E, 3038-M, 3047, 3517, 7025, and the Center Circle Facilities (Buildings 3030, 3031, 3032, 3033, 3033-A, 3034, and 3118). The scope of deactivation identified in this Baseline Report include surveillance and maintenance activities for each facility, engineering, contamination control and structural stabilization of each facility, radioluminescent (RL) light removal in Building 3026, re-roofing Buildings 3030, 3118, and 3031, Hot Cells Cleanup in Buildings 3047 and 3517, Yttrium (Y) Cell and Barricades Cleanup in Building 3038, Glove Boxes ampersand Hoods Removal in Buildings 3038 and 3047, and Inventory Transfer in Building 3517. For a detailed description of activities within this Work Breakdown Structure (WBS) element, see the Level 6 and Level 7 Element Definitions in Section 3.2 of this report

  5. The HCV Synthesis Project: Scope, methodology, and preliminary results

    Directory of Open Access Journals (Sweden)

    Scheinmann Roberta

    2008-09-01

    Full Text Available Abstract Background The hepatitis C virus (HCV is hyper-endemic in injecting drug users. There is also excess HCV among non-injection drug users who smoke, snort, or sniff heroin, cocaine, crack, or methamphetamine. Methods To summarize the research literature on HCV in drug users and identify gaps in knowledge, we conducted a synthesis of the relevant research carried out between 1989 and 2006. Using rigorous search methods, we identified and extracted data from published and unpublished reports of HCV among drug users. We designed a quality assurance system to ensure accuracy and consistency in all phases of the project. We also created a set of items to assess study design quality in each of the reports we included. Results We identified 629 reports containing HCV prevalence rates, incidence rates and/or genotype distribution among injecting or non-injecting drug user populations published between January 1989 and December 2006. The majority of reports were from Western Europe (41%, North America (26%, Asia (11% and Australia/New Zealand (10%. We also identified reports from Eastern Europe, South America, the Middle East, and the Caribbean. The number of publications reporting HCV rates in drug users increased dramatically between 1989 and 2006 to 27–52 reports per year after 1998. Conclusion The data collection and quality assurance phases of the HCV Synthesis Project have been completed. Recommendations for future research on HCV in drug users have come out of our data collection phase. Future research reports can enhance their contributions to our understanding of HCV etiology by clearly defining their drug user participants with respect to type of drug and route of administration. Further, the use of standard reporting methods for risk factors would enable data to be combined across a larger set of studies; this is especially important for HCV seroconversion studies which suffer from small sample sizes and low power to examine risk

  6. 36 CFR 1010.14 - Review of proposals by project applicants.

    Science.gov (United States)

    2010-07-01

    ...) With respect to each project proposed for consideration for which the NEPA Compliance Coordinator... the scope and content of the final EA. (e) With respect to each project proposed for consideration for... Trust and who certify that they have no financial or other interest in the outcome of the project, and...

  7. Advanced energy projects FY 1992 research summaries

    International Nuclear Information System (INIS)

    1992-09-01

    The Division of Advanced Energy Projects (AEP) provides support to explore the feasibility of novel, energy-related concepts that evolve from advances in basic research. These concepts are typically at an early stage of scientific definition and, therefore, are beyond the scope of ongoing applied research or technology development programs. The Division provides a mechanism for converting basic research findings to applications that eventually could impact the Nation's energy economy. Technical topics include physical, chemical, materials, engineering, and biotechnologies. Projects can involve interdisciplinary approaches to solve energy-related problems. Projects are supported for a finite period of time, which is typically three years. Annual funding levels for projects are usually about $300,000 but can vary from approximately $50,000 to $500,000. It is expected that, following AEP support, each concept will be sufficiently developed and promising to attract further funding from other sources in order to realize its full potential. There were 39 research projects in the Division of Advanced Energy Projects during Fiscal Year 1992 (October 1, 1991 -- September 30, 1992). The abstracts of those projects are provided to introduce the overall program in Advanced Energy Projects. Further information on a specific project may be obtained by contacting the principal investigator, who is listed below the project title. Projects completed during FY 1992 are indicated

  8. Scoping corrosion tests on candidate waste package basket materials for the Yucca Mountain project

    International Nuclear Information System (INIS)

    Konynenburg, R.A. van; Curtis, P.G.; Summers, T.S.E.

    1998-03-01

    A scoping corrosion test was performed on candidate waste package basket materials. The corrosion medium was a pH-buffered solution of chemical species expected to be produced by radiolysis. The test was conducted at 90 C for 96 hours. Samples included aluminum-, copper-, stainless steel- and zirconium-based metallic materials and several ceramics, incorporating neutron-absorbing elements. Sample weight losses and solution chemical changes were measured. Both corrosion of the host materials and dissolution of the neutron-absorbing elements were studied. The ceramics and the zirconium-based materials underwent only minor corrosion. The stainless steel-based materials performed well except for a welded sample. The aluminum- and copper-based materials exhibited the highest corrosion rates. Boron dissolution depends on its chemical form. Boron oxide and many metal borides dissolve readily in acidic solutions while high-chromium borides and boron carbide, though thermodynamically unstable, exhibit little dissolution in short times. The results of solution chemical analyses were consistent with this. Gadolinium did not dissolve significantly from monazite, and hafnium showed little dissolution from a variety of host materials, in keeping with its low solubility

  9. Steam generator replacement project in 2000

    International Nuclear Information System (INIS)

    Cerjak, J.; Holz, R.; Haus, J.; Gloaguen, C.

    1999-01-01

    NE Krsko has awarded the contract for the Steam Generator Replacement Project, which is one of the modernization projects in Krsko, to the Consortium of Siemens / Framatome in February 1998. This paper deals with the various aspects of the project: scope planning, engineering, preparation of modification packages for licensing, management, major techniques used, etc., showing also the status of the activities for the project which are scheduled to be performed in April through June 2000. The project is being performed on a turnkey basis, that means the Consortium is performing all engineering, preparation of the modification packages and site activities; NE Krsko is dealing with the licensing of the project.(author)

  10. Nature and scope of public administration

    Directory of Open Access Journals (Sweden)

    Uchem, R.O.

    2013-03-01

    Full Text Available The success and survival of any organizations be they government or not is contingent upon group efforts and cooperation to achieve set goals. This paper discusses the nature and scope of public administration to say that in modern day societies, any administration in the public interest transcends beyond government circles and finds expression in other spheres of human endeavors including the church, mosques, postal services as well as international relations and diplomacy, respectively. The paper discusses the concepts of administration and public administration thereby creating a distinction between the two concepts. Furthermore, the understanding of the scope of administration through the various schools of thought have also been captured, the essence of which is to generate a clearer understanding of the discourse under review. The paper ends with conclusions.

  11. 10 CFR 455.72 - Scope of the grant.

    Science.gov (United States)

    2010-01-01

    .... Such measures include, but are not necessarily limited to, those included in the definition of “energy... 10 Energy 3 2010-01-01 2010-01-01 false Scope of the grant. 455.72 Section 455.72 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION GRANT PROGRAMS FOR SCHOOLS AND HOSPITALS AND BUILDINGS OWNED BY...

  12. Pad A Treatability Study long-range project plan

    International Nuclear Information System (INIS)

    Mousseau, J.D.

    1991-08-01

    The purpose of the Pad A Treatability Study Project is to identify and demonstrate through lab- and pilot-scale testing, technologies for treating plutonium-contaminated salt waste. This document presents proposed objectives and schedules, scope of work and breakdown structure, cost elements, deployment, benefits, and change controls for the project

  13. Integrated monitoring and surveillance system demonstration project: Phase I accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Crawford, D.C.

    1997-01-01

    The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables

  14. FY 1992 revised task plans for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Shipler, D.B.

    1992-04-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to populations and individuals. The primary objectives of work to be performed in FY 1992 is to determine the appropriate scope (space, time, and radionuclides, pathways and individuals/population groups) and accuracy (level of uncertainty in dose estimates) for the project. Another objective is to use a refined computer model to estimate Native American tribal doses and individual doses for the Hanford Thyroid Disease Study (HTDS). Project scope and accuracy requirements defined in FY 1992 can translated into model and data requirements that must be satisfied during FY 1993

  15. Mindfulness Interventions in Physical Rehabilitation: A Scoping Review.

    Science.gov (United States)

    Hardison, Mark E; Roll, Shawn C

    2016-01-01

    A scoping review was conducted to describe how mindfulness is used in physical rehabilitation, identify implications for occupational therapy practice, and guide future research on clinical mindfulness interventions. A systematic search of four literature databases produced 1,524 original abstracts, of which 16 articles were included. Although only 3 Level I or II studies were identified, the literature included suggests that mindfulness interventions are helpful for patients with musculoskeletal and chronic pain disorders and demonstrate trends toward outcome improvements for patients with neurocognitive and neuromotor disorders. Only 2 studies included an occupational therapist as the primary mindfulness provider, but all mindfulness interventions in the selected studies fit within the occupational therapy scope of practice according to the American Occupational Therapy Association's Occupational Therapy Practice Framework: Domain and Process. Higher-level research is needed to evaluate the effects of mindfulness interventions in physical rehabilitation and to determine best practices for the use of mindfulness by occupational therapy practitioners. Copyright © 2016 by the American Occupational Therapy Association, Inc.

  16. What I learned from the Ypsilanti Perry Preschool Project: A teacher’s reflections

    Directory of Open Access Journals (Sweden)

    Derman-Sparks Louise

    2016-06-01

    Full Text Available This article, written by one of the teachers in the Ypsilanti Perry Preschool Project (1962-1967, critically examines the prevailing narrative about the preschool project’s relationship to the High/Scope Educational Foundation. It describes what the author and other teachers actually did, the principles that informed their practice, and challenges the prevailing myth that the Perry Preschool used the High/ Scope Educational Foundation curriculum. It also discusses what the High/Scope Longitudinal Study did not research about the program, families, and children in the Ypsilanti Perry Preschool and examines possible factors, beyond the curriculum, which effected its positive outcomes. The Perry Preschool Project occurred during the years of the 1960s Civil Rights Movement in the USA, and reflected prevailing ideologies and educational philosophies, some of which were in contention with each other. By bringing the Teachers’ voices to the prevailing discussion, which, to date, is dominated by the Project administrators’ perspective, the article seeks to open up new thinking about the lessons of the Ypsilanti Perry Preschool Project for both early childhood education pedagogy and research.

  17. Burnout and Scope of Practice in New Family Physicians.

    Science.gov (United States)

    Weidner, Amanda K H; Phillips, Robert L; Fang, Bo; Peterson, Lars E

    2018-05-01

    Family physicians report some of the highest levels of burnout, but no published work has considered whether burnout is correlated with the broad scope of care that family physicians may provide. We examined the associations between family physician scope of practice and self-reported burnout. Secondary analysis of the 2016 National Family Medicine Graduate Survey respondents who provided outpatient continuity care (N = 1,617). We used bivariate analyses and logistic regression to compare self-report of burnout and measures of scope of practice including: inpatient medicine, obstetrics, pediatric ambulatory care, number of procedures and/or clinical content areas, and providing care outside the principal practice site. Forty-two percent of respondents reported feeling burned out from their work once a week or more. In bivariate analysis, elements of scope of practice associated with higher burnout rates included providing more procedures/clinical content areas (mean procedures/clinical areas: 7.49 vs 7.02; P = .02) and working in more settings than the principal practice site (1+ additional settings: 57.6% vs 48.4%: P = .001); specifically in the hospital (31.4% vs 24.2%; P = .002) and patient homes (3.3% vs 1.5%; P = .02). In adjusted analysis, practice characteristics significantly associated with lower odds of burnout were practicing inpatient medicine (OR = 0.70; 95% CI, 0.56-0.87; P = .0017) and obstetrics (OR = 0.64; 95% CI, 0.47-0.88; P = .0058). Early career family physicians who provide a broader scope of practice, specifically, inpatient medicine, obstetrics, or home visits, reported significantly lower rates of burnout. Our findings suggest that comprehensiveness is associated with less burnout, which is critical in the context of improving access to good quality, affordable care while maintaining physician wellness. © 2018 Annals of Family Medicine, Inc.

  18. Quantitative Correlational Study: Emotional Intelligence and Project Outcomes among Hispanics in Technology

    Science.gov (United States)

    Trejo, Arturo

    2013-01-01

    The present quantitative correlational research study explored relationships between Emotional Intelligence (EI) competencies, such as self-awareness, self-management, social awareness, and relationship management, and project management outcomes: scope creep, in-budget project cost, and project timeliness. The study was conducted within the…

  19. 10 CFR 73.1 - Purpose and scope.

    Science.gov (United States)

    2010-01-01

    ... waterborne vehicle bomb assault, which may be coordinated with an external assault; and (v) A cyber attack... with an external assault; and (v) A cyber attack. (b) Scope. (1) This part prescribes requirements for... determined violent external assault, attack by stealth, or deceptive actions, including diversionary actions...

  20. Status and scope for EOR development in Oman

    International Nuclear Information System (INIS)

    Al-Adawy, M.S.; Nandyal, M.

    1991-01-01

    In view of a significant STOIIP (3000 + million m 3 ) of medium/heavy oil (less than 31 degrees API), EOR development in Oman has been and remains a major strategic option in its challenge to increase recovery and to meet long term production requirements. The initial EOR Development Program (1980-89) of which results are highlighted in this paper was based on a series of pilots and tests to gain experience and reduce uncertainties prior to embarking on wider EOR application. The processes tested included Steam and Polymer Flooding in the Marmul field, Steam Soak in five South Oman heavy oil fields and Hot water Injection in the Qarn Alam field. A wide range of reservoir types, oil characteristics and reservoir drive mechanisms have been covered in this test program. The initial program has provided the necessary operating/technical knowledge to enable new projects to be better defined. In this paper an overview of future EOR scope taking into consideration the current oil economic climate is developed and presented

  1. 78 FR 1246 - Otay River Estuary Restoration Project; South San Diego Bay Unit and Sweetwater Marsh Unit of the...

    Science.gov (United States)

    2013-01-08

    ...-FF08RSDC00] Otay River Estuary Restoration Project; South San Diego Bay Unit and Sweetwater Marsh Unit of the... scoping with regard to the environmental impact statement (EIS) for the proposed Otay River Estuary... one of the following methods. Email: [email protected] . Please include ``Otay Estuary NOI'' in the...

  2. Spatial fuel data products of the LANDFIRE Project

    Science.gov (United States)

    Matt Reeves; Kevin C. Ryan; Matthew G. Rollins; Thomas G. Thompson

    2009-01-01

    The Landscape Fire and Resource Management Planning Tools (LANDFIRE) Project is mapping wildland fuels, vegetation, and fire regime characteristics across the United States. The LANDFIRE project is unique because of its national scope, creating an integrated product suite at 30-m spatial resolution and complete spatial coverage of all lands within the 50...

  3. A study for EVMS application to NPP construction project

    Energy Technology Data Exchange (ETDEWEB)

    Roh, M. S.; Kwak, J. K. [KEPCO, Daejeon (Korea, Republic of)

    2016-05-15

    The earned value project management method integrates three critical elements of project management scope management, cost management and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments, and allows calculation of cost and schedule variances along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. It is also anticipated that there will be intense competition in the nuclear industry as the cost and time for nuclear power plant construction. In order to attain competitive advantages under the globalized market, utilizing advanced project control systems by integrating cost and time management is of great concern for practitioners as well as the researchers. In this context, the purpose of this paper is to identify major previously improving activities that characterize the real-world Earned Value Management System (EVMS) implementation for nuclear power plant construction. And several distinct attributes of nuclear power plant construction were also investigated.

  4. A study for EVMS application to NPP construction project

    International Nuclear Information System (INIS)

    Roh, M. S.; Kwak, J. K.

    2016-01-01

    The earned value project management method integrates three critical elements of project management scope management, cost management and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments, and allows calculation of cost and schedule variances along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. It is also anticipated that there will be intense competition in the nuclear industry as the cost and time for nuclear power plant construction. In order to attain competitive advantages under the globalized market, utilizing advanced project control systems by integrating cost and time management is of great concern for practitioners as well as the researchers. In this context, the purpose of this paper is to identify major previously improving activities that characterize the real-world Earned Value Management System (EVMS) implementation for nuclear power plant construction. And several distinct attributes of nuclear power plant construction were also investigated

  5. Brownfields City of Houston Solar Project: Solar Power Analysis and Design Specifications

    Science.gov (United States)

    This document details the scope of work elements completed in support of this project, as well as recommendations for next steps towards solar project development and power purchase agreement negotiation and finalization.

  6. The International Science and Technology Center: Scope of activities and scientific projects in the field of nuclear data

    International Nuclear Information System (INIS)

    Klepatsky, Alexander B.

    2002-01-01

    The review of the ISTC (The International Science and Technology Center) Programs and activities including Science Project Program, Partner Program, Seminar Program and others is presented. Project funding by technology area, by funding Parties, by CIS (Commonwealth of Independent States) States etc. is demonstrated with emphasis on projects in the field of nuclear data. The ISTC opportunities for international cooperation in the fields of nuclear data measurements, calculation, evaluation and dissemination are discussed. (author)

  7. The role of project planning in project management

    OpenAIRE

    Klitsenko, A. I.; Клиценко, А. И.

    2013-01-01

    This article describes the importance of the process of project planning. The author gives irrefutable arguments concerning crucial role of project planning. This article presents the definition, objects and the main goal of project planning. The purpose of this article is to review such objects of project planning as project scope, risk and human resources. Данная статья описывает важность процесса проектного планирования. Автор дает неопровержимые доводы, касающиеся решающей роли проектн...

  8. DESIGN VERIFICATION REPORT SPENT NUCLEAR FUEL (SNF) PROJECT CANISTER STORAGE BUILDING (CSB)

    International Nuclear Information System (INIS)

    BAZINET, G.D.

    2003-01-01

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Revision 3 of this document incorporates MCO Cover Cap Assembly welding verification activities. Verification activities for the installed and operational SSCs have been completed

  9. Project control - the next generation

    International Nuclear Information System (INIS)

    Iorii, V.F.; McKinnon, B.L.

    1993-01-01

    The Yucca Mountain Site Characterization Project (YMP) is the U.S. Department of Energy's (DOE) second largest Major System Acquisition Project. We have developed an integrated planning and control system (called PACS) that we believe represents the 'Next Generation' in project control. PACS integrates technical scope, cost, and schedule information for over 50 participating organizations and produces performances measurement reports for science and engineering managers at all levels. Our 'Next Generation' project control too, PACS, has been found to be in compliance with the new DOE Project Control System Guidelines. Additionally, the nuclear utility oversight group of the Edison Electric Institute has suggested PACS be used as a model for other civilian radioactive waste management projects. A 'Next Generation' project control tool will be necessary to do science in the 21st century

  10. Prioritizing health: a systematic approach to scoping determinants in health impact assessment

    Directory of Open Access Journals (Sweden)

    Lindsay McCallum

    2016-08-01

    Full Text Available The determinants of health are those factors that have the potential to affect health, either positively or negatively, and include a range of personal, social, economic, and environmental factors. In the practice of Health Impact Assessment (HIA, the stage at which the determinants of health are considered for inclusion is during the scoping step. The scoping step is intended to identify how the HIA will be carried out and to set the boundaries (e.g., temporal and geographical for the assessment. There are several factors that can help to inform the scoping process, many of which are considered in existing HIA tools and guidance; however, a systematic method of prioritizing determinants was found to be lacking. In order to analyze existing HIA scoping tools that are available, a systematic literature review was conducted including both primary and grey literature. A total of 10 HIA Scoping tools met the inclusion/exclusion criteria and were carried forward for comparative analysis. The analysis focused on minimum elements and practice standards of HIA scoping that have been established in the field. The analysis determined that existing approaches lack a clear, systematic method of prioritization of health determinants for inclusion in HIA. This finding led to the development of a Systematic HIA Scoping tool that addressed this gap. The decision matrix tool uses factors such as impact, public concern and data availability to prioritize health determinants. Additionally, the tool allows for identification of data gaps and provides a transparent method for budget allocation and assessment planning. In order to increase efficiency and improve utility, the tool was programmed into Microsoft Excel. Future work in the area of HIA methodology development is vital to the ongoing success of the practice and utilization of HIA as a reliable decision-making tool.

  11. Oxidizer Scoping Studies

    Energy Technology Data Exchange (ETDEWEB)

    Chancellor, Christopher John [Los Alamos National Laboratory

    2016-11-07

    The purpose of this report is to present the results of the acceptable knowledge (AK) review of oxidizers present in active waste streams, provide a technical analysis of the oxidizers, and report the results of the scoping study testing. This report will determine the fastest burning oxidizer to be used in the development of a Test Plan for Preparation and Testing of Sorbents Mixed with Oxidizer found in Transuranic Waste (DWT-TP-001). The companion report, DWT-RPT-002, Sorbent Scoping Studies, contains similar information for sorbents identified during the AK review of TRU waste streams. The results of the oxidizer and sorbent scoping studies will be used to inform the QL1 test plan. The QL1 test results will support the development of a basis of knowledge document that will evaluate oxidizing chemicals and sorbents in TRU waste and provide guidance for treatment.

  12. What I learned from the Ypsilanti Perry Preschool Project: A teacher’s reflections

    OpenAIRE

    Derman-Sparks Louise

    2016-01-01

    This article, written by one of the teachers in the Ypsilanti Perry Preschool Project (1962-1967), critically examines the prevailing narrative about the preschool project’s relationship to the High/Scope Educational Foundation. It describes what the author and other teachers actually did, the principles that informed their practice, and challenges the prevailing myth that the Perry Preschool used the High/ Scope Educational Foundation curriculum. It also discusses what the High/Scope Longitu...

  13. Project T100 -- Hazardous Materials Management and Emergency Response Training Center (HAMMER)

    International Nuclear Information System (INIS)

    Norton, C.E.

    1994-01-01

    The scope of this Quality Assurance Program Plan (QAPP) is to provide a system of Quality Assurance reviews and verifications on the design and construction of the Hazardous Materials Management and Emergency Response (HAMMER) Training Center, project 95L-EWT-100 at Hanford. The reviews and verifications will be on activities associated with design, procurement, and construction of the HAMMER project which includes, but is not limited to earthwork, placement of concrete, laying of rail, drilling of wells, water and sewer line fabrication and installation, communications systems, fire protection/detection systems, line tie-ins, building and mock-up (prop) construction, electrical, instrumentation, pump and valves and special coatings

  14. 16 CFR 1302.1 - Scope and application.

    Science.gov (United States)

    2010-01-01

    ... use by, consumers. For example, contact adhesives available in retail stores, such as lumber yards or hardware stores, for sale to consumers would be included in the scope of the ban even though such outlets may sell such products primarily to industrial or professional users. The manufacturer who markets an...

  15. Combined Amplification and Sound Generation for Tinnitus: A Scoping Review.

    Science.gov (United States)

    Tutaj, Lindsey; Hoare, Derek J; Sereda, Magdalena

    In most cases, tinnitus is accompanied by some degree of hearing loss. Current tinnitus management guidelines recognize the importance of addressing hearing difficulties, with hearing aids being a common option. Sound therapy is the preferred mode of audiological tinnitus management in many countries, including in the United Kingdom. Combination instruments provide a further option for those with an aidable hearing loss, as they combine amplification with a sound generation option. The aims of this scoping review were to catalog the existing body of evidence on combined amplification and sound generation for tinnitus and consider opportunities for further research or evidence synthesis. A scoping review is a rigorous way to identify and review an established body of knowledge in the field for suggestive but not definitive findings and gaps in current knowledge. A wide variety of databases were used to ensure that all relevant records within the scope of this review were captured, including gray literature, conference proceedings, dissertations and theses, and peer-reviewed articles. Data were gathered using scoping review methodology and consisted of the following steps: (1) identifying potentially relevant records; (2) selecting relevant records; (3) extracting data; and (4) collating, summarizing, and reporting results. Searches using 20 different databases covered peer-reviewed and gray literature and returned 5959 records. After exclusion of duplicates and works that were out of scope, 89 records remained for further analysis. A large number of records identified varied considerably in methodology, applied management programs, and type of devices. There were significant differences in practice between different countries and clinics regarding candidature and fitting of combination aids, partly driven by the application of different management programs. Further studies on the use and effects of combined amplification and sound generation for tinnitus are

  16. Early cost estimating for road construction projects using multiple regression techniques

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2011-12-01

    Full Text Available The objective of this study is to develop early cost estimating models for road construction projects using multiple regression techniques, based on 131 sets of data collected in the West Bank in Palestine. As the cost estimates are required at early stages of a project, considerations were given to the fact that the input data for the required regression model could be easily extracted from sketches or scope definition of the project. 11 regression models are developed to estimate the total cost of road construction project in US dollar; 5 of them include bid quantities as input variables and 6 include road length and road width. The coefficient of determination r2 for the developed models is ranging from 0.92 to 0.98 which indicate that the predicted values from a forecast models fit with the real-life data. The values of the mean absolute percentage error (MAPE of the developed regression models are ranging from 13% to 31%, the results compare favorably with past researches which have shown that the estimate accuracy in the early stages of a project is between ±25% and ±50%.

  17. Evaluating miscible flood projects for acquisition or viability

    International Nuclear Information System (INIS)

    Cassinat, J.C.

    1991-01-01

    Very little information exists regarding evaluating enhanced oil recovery (EOR) projects, in particular miscible floods. Due to the size and scope of most tertiary recovery projects, standard evaluation rules and techniques are too general and vague to adequately model these schemes. A procedure for identifying the risks associated with miscible EOR projects is presented. It is essential to set up a cash flow model that accurately represents the future performance of a miscible flood. Included in the model are the timing of crucial events such as expected solvent breakthrough and the injection of trace gas. The cash flow analysis allows a quick audit procedure and converts production into a monetary or economic evaluation criteria that can easily be compared to other investment alternatives. When evaluating a miscible flood project, forecasting production, solvent and chase gas recovery costs can become quite complex. An organized procedure for an evaluation will ensure that a comprehensive and thorough examination of all the data is completed, and will increase confidence levels associated with decision making. 32 refs., 4 figs., 4 tabs

  18. MARKETING STRATEGIES IN THE DEVELOPMENT AND IMPLEMENTATION OF THE PROJECT

    Directory of Open Access Journals (Sweden)

    Дмитрий Георгиевич БЕЗУГЛЫЙ

    2015-05-01

    Full Text Available The article is devoted to marketing in project management, as the scope of activities aimed at improving the quality characteristics of the project for its further effective market promotion in an increasingly competitive environment. Particular attention is paid to marketing strategies during the development and subsequent sale of the project to the investor. The problem of effective combination of marketing strategies and project management process is being solved.

  19. SCOPE: a scorecard for osteoporosis in Europe.

    Science.gov (United States)

    Kanis, J A; Borgström, F; Compston, J; Dreinhöfer, K; Nolte, E; Jonsson, L; Lems, W F; McCloskey, E V; Rizzoli, R; Stenmark, J

    2013-01-01

    The scorecard summarises key indicators of the burden of osteoporosis and its management in each of the member states of the European Union. The resulting scorecard elements were then assembled on a single sheet to provide a unique overview of osteoporosis in Europe. The scorecard for osteoporosis in Europe (SCOPE) is an independent project that seeks to raise awareness of osteoporosis care in Europe. The aim of this project was to develop a scorecard and background documents to draw attention to gaps and inequalities in the provision of primary and secondary prevention of fractures due to osteoporosis. The SCOPE panel reviewed the information available on osteoporosis and the resulting fractures for each of the 27 countries of the European Union (EU27). The information researched covered four domains: background information (e.g. the burden of osteoporosis and fractures), policy framework, service provision and service uptake e.g. the proportion of men and women at high risk that do not receive treatment (the treatment gap). There was a marked difference in fracture risk among the EU27. Of concern was the marked heterogeneity in the policy framework, service provision and service uptake for osteoporotic fracture that bore little relation to the fracture burden. For example, despite the wide availability of treatments to prevent fractures, in the majority of the EU27, only a minority of patients at high risk receive treatment for osteoporosis even after their first fracture. The elements of each domain in each country were scored and coded using a traffic light system (red, orange, green) and used to synthesise a scorecard. The resulting scorecard elements were then assembled on a single sheet to provide a unique overview of osteoporosis in Europe. The scorecard will enable healthcare professionals and policy makers to assess their country's general approach to the disease and provide indicators to inform future provision of healthcare.

  20. Project management for profit a failsafe guide to keeping projects on track and on budget

    CERN Document Server

    Knight, Joe; Angus, Brad; Case, John

    2012-01-01

    If your work involves projects, then this book is for you. It will show every company owner and project manager—at businesses large and small—how to run projects differently. You’ll benefit if you’ve ever: • been over budget on a project • exceeded a timeline on a project • worked on a project that completely stalled as you neared the finish line • lost money on a sure-thing project and had no idea why • noticed that scope and feature creep held you back • watched a project take three times as long as planned • felt too embarrassed to perform a review of your successes and failures • wondered whether your project actually made any money By the time you finish the book, you’ll be ready to implement Project Management for Profit in your own company—and be prepared to keep your projects on track and on budget.

  1. Development of first full scope commercial CANDU-6 fuel handling simulator

    Energy Technology Data Exchange (ETDEWEB)

    Crawford, W., E-mail: BCrawford@atlanticnuclear.ca [Atlantic Nuclear Services Inc., Fredericton, NB (Canada); McInerney, J. M., E-mail: JMcInerney@nbpower.com [Point Lepreau Generating Station, Maces Bay, NB (Canada); Moran, E.S.; Nice, J. W.; Sinclair, D.M.; Somerville, S.; Usalp, E.C.; Usalp, M., E-mail: EMoran@atlanticnuclear.ca, E-mail: JNice@atlanticnuclear.ca, E-mail: DSinclair@atlanticnuclear.ca, E-mail: SSomerville@atlanticnuclear.ca, E-mail: ECUsalp@atlanticnuclear.ca, E-mail: MUsalp@atlanticnuclear.ca [Atlantic Nuclear Services Inc., Fredericton, NB (Canada)

    2015-07-01

    Unique to CANDU reactors is continuous on-power refueling. In the CANDU-6 design, the fuel bundles are contained within 380 pressure tubes. Fuelling machines, one on either side of the reactor face move on a bridge and carriage system to the appointed channel and fuel under computer control. The fuelling machine is an immensely complicated mechanical device. None of the original Canadian full scope simulators incorporated the interaction of the fuel handling system. Traditionally, the final stages of Fuel Handling Operator qualification utilizes on the job training in a production environment carried out in the station main control room. For the purpose of supporting continual improvement in fuel handling training at the Third Qinshan Nuclear Plant Company (TQNPC), Atlantic Nuclear Services in a joint project with New Brunswick Power, developed the first commercial full scope CANDU-6 Fuel Handling simulator, integrated into the existing TQNPC Full Scope Simulator framework. The TQNPC Fuel Handling simulator is capable of supporting all normal on-power and off-power refuelling procedures as well as other abnormal operating conditions, which will allow training to be conducted, based on the plant specific operating procedures. This paper will discuss its development, the importance of this tool and its advantages over past training practices. (author)

  2. Development of first full scope commercial CANDU-6 fuel handling simulator

    International Nuclear Information System (INIS)

    Crawford, W.; McInerney, J. M.; Moran, E.S.; Nice, J. W.; Sinclair, D.M.; Somerville, S.; Usalp, E.C.; Usalp, M.

    2015-01-01

    Unique to CANDU reactors is continuous on-power refueling. In the CANDU-6 design, the fuel bundles are contained within 380 pressure tubes. Fuelling machines, one on either side of the reactor face move on a bridge and carriage system to the appointed channel and fuel under computer control. The fuelling machine is an immensely complicated mechanical device. None of the original Canadian full scope simulators incorporated the interaction of the fuel handling system. Traditionally, the final stages of Fuel Handling Operator qualification utilizes on the job training in a production environment carried out in the station main control room. For the purpose of supporting continual improvement in fuel handling training at the Third Qinshan Nuclear Plant Company (TQNPC), Atlantic Nuclear Services in a joint project with New Brunswick Power, developed the first commercial full scope CANDU-6 Fuel Handling simulator, integrated into the existing TQNPC Full Scope Simulator framework. The TQNPC Fuel Handling simulator is capable of supporting all normal on-power and off-power refuelling procedures as well as other abnormal operating conditions, which will allow training to be conducted, based on the plant specific operating procedures. This paper will discuss its development, the importance of this tool and its advantages over past training practices. (author)

  3. [Identification of the scope of practice for dental nurses with Delphi method].

    Science.gov (United States)

    Li, Yu-Hong; Lu, Yue-Cen; Huang, Yao; Ruan, Hong; Wu, Zheng-Yi

    2016-10-01

    To identify the practice scope of dental nurses under the new situations. The draft of scope of practice for dental nurses was based on theoretical analysis, literature review and consultation of advisory panel, and the final scope of practice for dental nurses was established by using the Delphi method. Statistical analysis was implemented using coefficient of variation, Kendall W with SPSS 17.0 software package. Thirty experts were consulted twice by using the Delphi method. The effective rates of two rounds of questionnaire were 100% and 73.3%, respectively. The authority coefficient was 0.837, and the P value of expert coordination coefficients W was less than 0.05. There were totally 116 suggestions from the experts, and 96 were accepted. The scope of practice for dental nurses was finally established, including 4 primary indexes and 25 secondary indexes. The scope of practice for dental nurses under the new situations is established in China through scientific methods. It is favorable for position management of dental nurses and may promote the development of nurse specialists in dental clinic.

  4. PROJECTIZING AN OPERATING NUCLEAR FACILITY

    International Nuclear Information System (INIS)

    Adams, N

    2007-01-01

    This paper will discuss the evolution of an operations-based organization to a project-based organization to facilitate successful deactivation of a major nuclear facility. It will describe the plan used for scope definition, staff reorganization, method estimation, baseline schedule development, project management training, and results of this transformation. It is a story of leadership and teamwork, pride and success. Workers at the Savannah River Site's (SRS) F Canyon Complex (FCC) started with a challenge--take all the hazardous byproducts from nearly 50 years of operations in a major, first-of-its-kind nuclear complex and safely get rid of them, leaving the facility cold, dark, dry and ready for whatever end state is ultimately determined by the United States Department of Energy (DOE). And do it in four years, with a constantly changing workforce and steadily declining funding. The goal was to reduce the overall operating staff by 93% and budget by 94%. The facilities, F Canyon and its adjoined sister, FB Line, are located at SRS, a 310-square-mile nuclear reservation near Aiken, S.C., owned by DOE and managed by Washington Group International subsidiary Washington Savannah River Company (WSRC). These facilities were supported by more than 50 surrounding buildings, whose purpose was to provide support services during operations. The radiological, chemical and industrial hazards inventory in the old buildings was significant. The historical mission at F Canyon was to extract plutonium-239 and uranium-238 from irradiated spent nuclear fuel through chemical processing. FB Line's mission included conversion of plutonium solutions into metal, characterization, stabilization and packaging, and storage of both metal and oxide forms. The plutonium metal was sent to another DOE site for use in weapons. Deactivation in F Canyon began when chemical separations activities were completed in 2002, and a cross-functional project team concept was implemented to successfully

  5. The High Scope Approach To Early Learning

    OpenAIRE

    French, Geraldine

    2012-01-01

    Learning Objectives: After studying this chapter the reader should be able to: • Describe the historical origins, the longitudinal research, and the theoretical underpinnings of the HighScope approach. • Identify the teaching strategies adopted by HighScope educators. • Appreciate the curriculum content. • Understand the HighScope approach to the assessment of children’s learning. • Consider some criticisms of the HighScope research and approach to early learning. This ...

  6. Marine Radioecology. Current Research and Future Scope

    International Nuclear Information System (INIS)

    1967-03-01

    This report consists of answers submitted by various laboratory directors or individual investigators who responded to an International Atomic Energy Agency questionnaire concerning their present research programme, future scope of that programme, the investigators' ideas and opinions on marine radioecology research. Information on the possibility of co-operation with other laboratories is also included

  7. SNF sludge treatment system preliminary project execution plan

    International Nuclear Information System (INIS)

    Flament, T.A.

    1998-01-01

    The Fluor Daniel Hanford, Inc. (FDH) Project Director for the Spent Nuclear Fuel (SNF) Project has requested Numatec Hanford Company (NHC) to define how Hanford would manage a new subproject to provide a process system to receive and chemically treat radioactive sludge currently stored in the 100 K Area fuel retention basins. The subproject, named the Sludge Treatment System (STS) Subproject, provides and operates facilities and equipment to chemically process K Basin sludge to meet Tank Waste Remediation System (TWRS) requirements. This document sets forth the NHC management approach for the STS Subproject and will comply with the requirements of the SNF Project Management Plan (HNF-SD-SNFPMP-011). This version of this document is intended to apply to the initial phase of the subproject and to evolve through subsequent revision to include all design, fabrication, and construction conducted on the project and the necessary management and engineering functions within the scope of the subproject. As Project Manager, NHC will perform those activities necessary to complete the STS Subproject within approved cost and schedule baselines and turn over to FDH facilities, systems, and documentation necessary for operation of the STS

  8. Project Delivery Acquisition and Contracting Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    MERCADO, L.C.

    2000-01-01

    This document is a plan presenting the process, strategies and approaches for vendor contracting by the Tank Farm Contractor. The plan focuses on contracting structures, practices, methods, and desired approaches in contracting. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has contracted with the CH2M HILL Hanford Group, Inc. (CHG), as the Tank Farm Contractor (TFC), to support vitrification of Hanford Site tank waste by the Privatization Contractor. During Waste Feed Delivery Phase 1, waste will be retrieved from certain double-shell tanks and delivered to the Privatization Contractor to meet contract feed delivery requirements. Near-term project goals include upgrading infrastructure systems; retrieving and delivering the waste; and accepting the waste packages for interim onsite storage and disposal. Project Delivery includes individual projects assigned to provide the infrastructure and systems responsible to provide engineering, design, procurement, installation/construction, and testing/turnover of systems for retrieval of waste from Hanford double-shell tanks. This plan sets the requirements for projects work scope, contracting practices, structures, methods, and performance measurements. The plan is designed to integrate Life-Cycle Projects acquisitions and provide a consistent contracting approach. This effort will serve as a step improvement in contract reform implementing commercial practices into DOE projects

  9. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    International Nuclear Information System (INIS)

    PICKETT, W.W.

    2000-01-01

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. Because this sub-project is still in the construction/start-up phase, all verification activities have not yet been performed (e.g., canister cover cap and welding fixture system verification, MCO Internal Gas Sampling equipment verification, and As-built verification.). The verification activities identified in this report that still are to be performed will be added to the start-up punchlist and tracked to closure

  10. DESIGN VERIFICATION REPORT SPENT NUCLEAR FUEL (SNF) PROJECT CANISTER STORAGE BUILDING (CSB)

    Energy Technology Data Exchange (ETDEWEB)

    BAZINET, G.D.

    2003-02-12

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Revision 3 of this document incorporates MCO Cover Cap Assembly welding verification activities. Verification activities for the installed and operational SSCs have been completed.

  11. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    Energy Technology Data Exchange (ETDEWEB)

    PICKETT, W.W.

    2000-09-22

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. Because this sub-project is still in the construction/start-up phase, all verification activities have not yet been performed (e.g., canister cover cap and welding fixture system verification, MCO Internal Gas Sampling equipment verification, and As-built verification.). The verification activities identified in this report that still are to be performed will be added to the start-up punchlist and tracked to closure.

  12. National Space Biomedical Research Institute (NSBRI) JSC Summer Projects

    Science.gov (United States)

    Dowdy, Forrest Ryan

    2014-01-01

    This project optimized the calorie content in a breakfast meal replacement bar for the Advanced Food Technology group. Use of multivariable optimization yielded the highest weight savings possible while simultaneously matching NASA Human Standards nutritional guidelines. The scope of this research included the study of shelf-life indicators such as water activity, moisture content, and texture analysis. Key metrics indicate higher protein content, higher caloric density, and greater mass savings as a result of the reformulation process. The optimization performed for this study demonstrated wide application to other food bars in the Advanced Food Technology portfolio. Recommendations for future work include shelf life studies on bar hardening and overall acceptability data over increased time frames and temperature fluctuation scenarios.

  13. 40 CFR 725.1000 - Scope.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 30 2010-07-01 2010-07-01 false Scope. 725.1000 Section 725.1000 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT REPORTING....1000 Scope. This subpart identifies uses of microorganisms which EPA has determined to be significant...

  14. 47 CFR 1.1601 - Scope.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Scope. 1.1601 Section 1.1601 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE Random Selection Procedures for Mass Media Services General Procedures § 1.1601 Scope. The provisions of this subpart, and the provisions...

  15. 47 CFR 27.801 - Scope.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Scope. 27.801 Section 27.801 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES MISCELLANEOUS WIRELESS COMMUNICATIONS SERVICES 1.4 GHz Band § 27.801 Scope. This subpart sets out the regulations governing service in...

  16. 5 CFR 2634.801 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Scope. 2634.801 Section 2634.801 Administrative Personnel OFFICE OF GOVERNMENT ETHICS GOVERNMENT ETHICS EXECUTIVE BRANCH FINANCIAL DISCLOSURE, QUALIFIED TRUSTS, AND CERTIFICATES OF DIVESTITURE Ethics Agreements § 2634.801 Scope. This subpart applies...

  17. The fuel cycle scoping system

    International Nuclear Information System (INIS)

    Dooley, G.D.; Malone, J.P.

    1986-01-01

    The Fuel Cycle Scoping System (FCSS) was created to fill the need for a scoping tool which provides the utilities with the ability to quickly evaluate alternative fuel management strategies, tails assay choices, fuel fabrication quotes, fuel financing alternatives, fuel cycle schedules, and other fuel cycle perturbations. The FCSS was specifically designed for PC's that support dBASE-III(TM), a relational data base software system by Ashton-Tate. However, knowledge of dBASE-III is not necessary in order to utilize the FCSS. The FCSS is menu driven and can be utilized as a teaching tool as well as a scoping tool

  18. Causes and remedies for the dominant risk factors in Enterprise System implementation projects: the consultants' perspective.

    Science.gov (United States)

    Lech, Przemysław

    2016-01-01

    The purpose of this research was to investigate the causes of the dominant risk factors, affecting Enterprise System implementation projects and propose remedies for those risk factors from the perspective of implementation consultants. The study used a qualitative research strategy, based on e-mail interviews, semi-structured personal interviews with consultants and participant observation during implementation projects. The main contribution of this paper is that it offers viable indications of how to mitigate the dominant risk factors. These indications were grouped into the following categories: stable project scope, smooth communication supported by the project management, dedicated, competent and decision-making client team, competent and engaged consultant project manager, schedule and budget consistent with the project scope, use of methodology and procedures, enforced and enabled by the project managers, competent and dedicated consultants. A detailed description is provided for each category.

  19. Atucha II NPP full scope simulator modelling with the thermal hydraulic code TRACRT

    International Nuclear Information System (INIS)

    Alonso, Pablo Rey; Ruiz, Jose Antonio; Rivero, Norberto

    2011-01-01

    In February 2010 NA-SA (Nucleoelectrica Argentina S.A.) awarded Tecnatom the Atucha II full scope simulator project. NA-SA is a public company owner of the Argentinean nuclear power plants. Atucha II is due to enter in operation shortly. Atucha II NPP is a PHWR type plant cooled by the water of the Parana River and has the same design as the Atucha I unit, doubling its power capacity. Atucha II will produce 745 MWe utilizing heavy water as coolant and moderator, and natural uranium as fuel. A plant singular feature is the permanent core refueling. TRAC R T is the first real time thermal hydraulic six-equations code used in the training simulation industry for NSSS modeling. It is the result from adapting to real time the best estimate code TRACG. TRAC R T is based on first principle conservation equations for mass, energy and momentum for liquid and steam phases, with two phase flows under non homogeneous and non equilibrium conditions. At present, it has been successfully implemented in twelve full scope replica simulators in different training centers throughout the world. To ease the modeling task, TRAC R T includes a graphical pre-processing tool designed to optimize this process and alleviate the burden of entering alpha numerical data in an input file. (author)

  20. Medication safety programs in primary care: a scoping review.

    Science.gov (United States)

    Khalil, Hanan; Shahid, Monica; Roughead, Libby

    2017-10-01

    Medication safety plays an essential role in all healthcare organizations; improving this area is paramount to quality and safety of any wider healthcare program. While several medication safety programs in the hospital setting have been described and the associated impact on patient safety evaluated, no systematic reviews have described the impact of medication safety programs in the primary care setting. A preliminary search of the literature demonstrated that no systematic reviews, meta-analysis or scoping reviews have reported on medication safety programs in primary care; instead they have focused on specific interventions such as medication reconciliation or computerized physician order entry. This scoping review sought to map the current medication safety programs used in primary care. The current scoping review sought to examine the characteristics of medication safety programs in the primary care setting and to map evidence on the outcome measures used to assess the effectiveness of medication safety programs in improving patient safety. The current review considered participants of any age and any condition using care obtained from any primary care services. We considered studies that focussed on the characteristics of medication safety programs and the outcome measures used to measure the effectiveness of these programs on patient safety in the primary care setting. The context of this review was primary care settings, primary healthcare organizations, general practitioner clinics, outpatient clinics and any other clinics that do not classify patients as inpatients. We considered all quantitative studied published in English. A three-step search strategy was utilized in this review. Data were extracted from the included studies to address the review question. The data extracted included type of medication safety program, author, country of origin, aims and purpose of the study, study population, method, comparator, context, main findings and outcome

  1. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  2. Radiophotoluminescence light scope for high-dose dosimetry

    International Nuclear Information System (INIS)

    Sato, Fuminobu; Zushi, Naoki; Sakiyama, Tomoki; Kato, Yushi; Murata, Isao; Shimizu, Kikuo; Yamamoto, Takayoshi; Iida, Toshiyuki

    2015-01-01

    A radiophotoluminescence (RPL) light scope is a remote-sensing technique for measuring in situ the radiation dose in an RPL detector placed at a distance. The RPL light scope is mainly composed of an ultraviolet (UV) pulse laser, telescopic lenses, a photomultiplier tube, and camera modules. In a performance test, some RPL detectors were placed at distances up to 30 m and were illuminated with a pulsed UV laser beam. The photoluminescence responses of the RPL detectors were analyzed using this scope. Their radiation doses were determined from the amplitude of the given component of the photoluminescence responses. The RPL readout could be repeated without fading, and its amplitude exhibited good linearity at a dose ranging from 0.1 to 60 Gy. Furthermore, a two-dimensional distribution of radiation dose was obtained by laser scanning on an RPL detector. It was confirmed that the RPL light scope was a useful remote-sensing tool for high-dose dosimetry. - Highlights: • A radiophotoluminescence (RPL) light scope was developed for high-dose dosimetry. • The RPL light scope has high sensitivity and accuracy in high-dose dosimetry. • Two-dimensional radiation dose distribution was obtained by the RPL light scope.

  3. Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004

    International Nuclear Information System (INIS)

    1993-11-01

    This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems

  4. 17 CFR 39.1 - Scope.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Scope. 39.1 Section 39.1 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION DERIVATIVES CLEARING ORGANIZATIONS § 39.1 Scope. The provisions of this part apply to any derivatives clearing organization as defined...

  5. Validation of AEGIS/SCOPE2 system through actual core follow calculations with irregular operational conditions

    International Nuclear Information System (INIS)

    Tabuchi, M.; Tatsumi, M.; Ohoka, Y.; Nagano, H.; Ishizaki, K.

    2017-01-01

    This paper describes overview of AEGIS/SCOPE2 system, an advanced in-core fuel management system for pressurized water reactors, and its validation results of actual core follow calculations including irregular operational conditions. AEGIS and SCOPE2 codes adopt more detailed and accurate calculation models compared to the current core design codes while computational cost is minimized with various techniques on numerical and computational algorithms. Verification and validation of AEGIS/SCOPE2 has been intensively performed to confirm validity of the system. As a part of the validation, core follow calculations have been carried out mainly for typical operational conditions. After the Fukushima Daiichi nuclear power plant accident, however, all the nuclear reactors in Japan suffered from long suspension and irregular operational conditions. In such situations, measured data in the restart and operation of the reactors should be good examinations for validation of the codes. Therefore, core follow calculations were carried out with AEGIS/SCOPE2 for various cases including zero power reactor physics tests with irregular operational conditions. Comparisons between measured data and predictions by AEGIS/SCOPE2 revealed the validity and robustness of the system. (author)

  6. Plant specific basic principle simulator as a first step to plant specific full scope simulator

    International Nuclear Information System (INIS)

    Krajnc, B.; Pribozic, F.; Novsak, M.

    1996-01-01

    Nuklearna Elektrarna Krsko (NEK) decided to enhance the quality and scope of initial training of NEK technical personnel, mainly in so called Phase 1 and 2 of training for licensed personnel. This training is a prerequisite for further training on the full scope simulator for future operators and is also given to larger number of engineers, working in different important areas where thorough knowledge of nuclear technology and plant systems is required. Due to that it was decided that plant specific Basis Principle Simulators (BPS) should be developed. The other important reason for such decision was an indication that NEK specific full scope simulator will have to be purchased. Based on that it was concluded that BPS should serve as a good opportunity to learn about the state of the art approaches in the modeling area, to see in which direction development of software in conjunction with state of the art hardware is going and in particular to the extent possible verify the existence of required plant documentation in support BPS and later plant specific full scope simulator. In this paper the scope of NEK BPS simulation, experience in initial data gathering, experience with know-how transfer based on direct involvement of NEK and Izobrazevalni Center za Jedrsko Tehnnologijo (ICJT) personnel in modeling of instrumentation and control will be presented. Lessons learned, particularly in light of coming project for NEK full scope simulator, will also be addressed. The future use of the BPS in the NEK training programs will be described. It can be concluded that due to very complex technology, phase approaches in training of key NEK technical personnel, the development of NEK plant specific BPS is justifiable, regardless of the fact that NEK will also obtain specific full scope simulator. It has to be pointed out that BPS can not be supplement for plant specific full scope simulator, due to number of reasons discussed in the paper. (author)

  7. Overview criteria for the environmental, safety and health evaluation of remedial action project planning

    International Nuclear Information System (INIS)

    Stenner, R.D.; Denham, D.H.

    1984-10-01

    Overview criteria (i.e., subject areas requiring review) for evaluating remedial action project plans with respect to environmental, safety and health issues were developed as part of a Department of Energy, Office of Operational Safety, technical support project. Nineteen elements were identified as criteria that should be addressed during the planning process of a remedial action (decontamination and decommissioning) project. The scope was interpreted broadly enough to include such environmental, safety and health issues as public image, legal obligation and quality assurance, as well as more obvious concerns such as those involving the direct protection of public and worker health. The nineteen elements are discussed along with suggested ways to use a data management software system to organize and report results

  8. 78 FR 13315 - Bridger-Teton National Forest; Wyoming; Teton to Snake Fuels Management Project

    Science.gov (United States)

    2013-02-27

    ... Fuels Management Project AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an...) to document the potential effects of the Teton to Snake Fuels Management Project. The analysis will... Caribou-Targhee National Forest. The Teton to Snake Fuels Management Project was previously scoped and...

  9. An EarthScope Plate Boundary Observatory Progress Report

    Science.gov (United States)

    Jackson, M.; Anderson, G.; Blume, F.; Walls, C.; Coyle, B.; Feaux, K.; Friesen, B.; Phillips, D.; Hafner, K.; Johnson, W.; Mencin, D.; Pauk, B.; Dittmann, T.

    2007-12-01

    UNAVCO is building and operating the Plate Boundary Observatory (PBO), part of the NSF-funded EarthScope project to understand the structure, dynamics, and evolution of the North American continent. When complete in October 2008, the 875 GPS, 103 strain and seismic, and 28 tiltmeters stations will comprise the largest integrated geodetic and seismic network in United States and the second largest in the world. Data from the PBO network will facilitate research into plate boundary deformation with unprecedented scope and detail. As of 1 September 2007, UNAVCO had completed 680 PBO GPS stations and had upgraded 89% of the planned PBO Nucleus stations. Highlights of the past year's work include the expansion of the Alaska subnetwork to 95 continuously-operating stations, including coverage of Akutan and Augustine volcanoes and reconnaissance for future installations on Unimak Island; the installation of nine new stations on Mt. St. Helens; and the arrival of 33 permits for station installations on BLM land in Nevada. The Augustine network provided critical data on magmatic and volcanic processes associated with the 2005-2006 volcanic crisis, and has expanded to a total of 11 stations. Please visit http://pboweb.unavco.org/?pageid=3 for further information on PBO GPS network construction activities. As of September 2007, 41 PBO borehole stations had been installed and three laser strainmeter stations were operating, with a total of 60 borehole stations and 4 laser strainmeters expected by October 2007. In response to direction from the EarthScope community, UNAVCO installed a dense network of six stations along the San Jacinto Fault near Anza, California; installed three of four planned borehole strainmeter stations on Mt. St. Helens; and has densified coverage of the Parkfield area. Please visit http://pboweb.unavco.org/?pageid=8 for more information on PBO strainmeter network construction progress. The combined PBO/Nucleus GPS network provides 350 GB of raw standard

  10. Amoco-US Environmental Protection Agency, pollution prevention project, Yorktown, Virginia: Project peer review. Report of the Peer Review Committee of the Amoco/EPA Pollution Prevention Project at the Yorktown, Virginia refinery

    International Nuclear Information System (INIS)

    Klee, H.; Podar, M.

    1991-01-01

    The Amoco/EPA Pollution Prevention Project involved a number of representatives from federal and Virginia regulatory agencies, and Amoco's refining business. Participants believed that the Project could benefit from a broader perspective than these organizations along might provide. The Project Work Group selected an independent Peer Review Process which was conducted by Resource for the Future (RFF), a Washington DC think tank. A group of technical, policy and environmental experts from diverse backgrounds served as Peer Review members. The Peer Review Committee met on three occasions to discuss (1) the Project Work Plan (2) sampling data and interpretation and (3) project conclusions and recommendations. The focus of the meeting was on the general scope and content of the project

  11. Project W-420 Stack Monitoring system upgrades conceptual design report

    International Nuclear Information System (INIS)

    TUCK, J.A.

    1998-01-01

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks

  12. Project W-420 Stack Monitoring system upgrades conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    TUCK, J.A.

    1998-11-06

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks.

  13. PUREX transition project case study

    International Nuclear Information System (INIS)

    Jasen, W.G.

    1996-01-01

    In December 1992, the US Department of Energy (DOE) directed that the Plutonium-Uranium Extraction (PUREX) Plant be shut down and deactivated because it was no longer needed to support the nation's production of weapons-grade plutonium. The PUREX/UO 2 Deactivation Project will establish a safe and environmentally secure configuration for the facility and preserve that configuration for 10 years. The 10-year span is used to predict future maintenance requirements and represents the estimated time needed to define, authorize, and initiate the follow-on decontamination and decommissioning activities. Accomplishing the deactivation project involves many activities. Removing major hazards, such as excess chemicals, spent fuel, and residual plutonium are major goals of the project. The scope of the PUREX Transition Project is described within

  14. National Ignition Facility project acquisition plan

    International Nuclear Information System (INIS)

    Callaghan, R.W.

    1996-04-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertial Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF

  15. Academic Researchers on the Project Market in the Ethos of Knowledge Capitalism

    Science.gov (United States)

    Brunila, Kristiina; Hannukainen, Kristiina

    2017-01-01

    How knowledge capitalism retools the scope of academic research and researchers is an issue which this article ties to the project market in the ethos of knowledge capitalism. In Finland, academic research has been forced to apply for funding in project-based activities reflecting European Union policies. The project market, which in this article…

  16. Can optical diagnosis of small colon polyps be accurate? Comparing standard scope without narrow banding to high definition scope with narrow banding.

    Science.gov (United States)

    Ashktorab, Hassan; Etaati, Firoozeh; Rezaeean, Farahnaz; Nouraie, Mehdi; Paydar, Mansour; Namin, Hassan Hassanzadeh; Sanderson, Andrew; Begum, Rehana; Alkhalloufi, Kawtar; Brim, Hassan; Laiyemo, Adeyinka O

    2016-07-28

    To study the accuracy of using high definition (HD) scope with narrow band imaging (NBI) vs standard white light colonoscope without NBI (ST), to predict the histology of the colon polyps, particularly those high definition colonoscopes with NBI. The histopathologic diagnosis was reported by pathologists as part of routine care. Of participants in the study, 55 (37%) were male and median (interquartile range) of age was 56 (19-80). Demographic, clinical characteristics, past medical history of patients, and the data obtained by two instruments were not significantly different and two methods detected similar number of polyps. In ST scope 89% of polyps were scope (P = 0.7). The ST scope had a positive predictive value (PPV) and positive likelihood ratio (PLR) of 86% and 4.0 for adenoma compared to 74% and 2.6 for HD scope. There was a trend of higher sensitivity for HD scope (68%) compare to ST scope (53%) with almost the same specificity. The ST scope had a PPV and PLR of 38% and 1.8 for hyperplastic polyp (HPP) compared to 42% and 2.2 for HD scope. The sensitivity and specificity of two instruments for HPP diagnosis were similar. Our results indicated that HD scope was more sensitive in diagnosis of adenoma than ST scope. Clinical diagnosis of HPP with either scope is less accurate compared to adenoma. Colonoscopy diagnosis is not yet fully matched with pathologic diagnosis of colon polyp. However with the advancement of both imaging and training, it may be possible to increase the sensitivity and specificity of the scopes and hence save money for eliminating time and the cost of Immunohistochemistry/pathology.

  17. 22 CFR 309.2 - Scope.

    Science.gov (United States)

    2010-04-01

    ... thereof, or any public international organization. (2) Debts arising out of acquisitions contracts subject... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Scope. 309.2 Section 309.2 Foreign Relations PEACE CORPS DEBT COLLECTION General Provisions § 309.2 Scope. (a) Applicability of Federal Claims...

  18. 12 CFR 308.600 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Scope. 308.600 Section 308.600 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION PROCEDURE AND RULES OF PRACTICE RULES OF PRACTICE AND PROCEDURE Removal, Suspension, and Debarment of Accountants From Performing Audit Services § 308.600 Scope...

  19. 10 CFR 60.150 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Scope. 60.150 Section 60.150 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Quality Assurance § 60.150 Scope. As used in this part, quality assurance comprises all those planned and systematic...

  20. 10 CFR 434.101 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Scope. 434.101 Section 434.101 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY CODE FOR NEW FEDERAL COMMERCIAL AND MULTI-FAMILY HIGH RISE RESIDENTIAL BUILDINGS Administration and Enforcement-General § 434.101 Scope. 101.1 This part provides design...

  1. 30 CFR 75.823 - Scope.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Scope. 75.823 Section 75.823 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Underground High-Voltage Distribution High-Voltage Longwalls § 75.823 Scope...

  2. 15 CFR 762.1 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Scope. 762.1 Section 762.1 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE EXPORT ADMINISTRATION REGULATIONS RECORDKEEPING § 762.1 Scope. In...

  3. 47 CFR 22.801 - Scope.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Scope. 22.801 Section 22.801 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PUBLIC MOBILE SERVICES Air-Ground Radiotelephone Service § 22.801 Scope. The rules in this subpart govern the licensing and operation of air-ground...

  4. 33 CFR 25.801 - Scope.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Scope. 25.801 Section 25.801 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY GENERAL CLAIMS Pollution Removal Damage Claims § 25.801 Scope. This subpart prescribes the requirements for the administrative settlement...

  5. Transformation of medical education through Decentralised Training Platforms: a scoping review.

    Science.gov (United States)

    Mlambo, Motlatso; Dreyer, Abigail; Dube, Rainy; Mapukata, Nontsikelelo; Couper, Ian; Cooke, Richard

    2018-03-01

    Medical education in South Africa is facing a major paradigm shift. The urgency to increase the number of suitable, qualified and socially accountable health sciences graduates has brought to the fore the need to identify alternative training platforms and learning environments, often in rural areas. Subsequently, the focus has now shifted towards strengthening primary health care and community based health services. This scoping review presents a synopsis of the existing literature on decentralized training platform (DTP) strategies for medical education internationally, outlining existing models within it and its impact. This scoping review followed Arksey and O'Malley's framework outlining five stages: (i) identification of a research question, (ii) identification of relevant studies, (iii) study selection criteria, (iv) data charting, and (v) collating, summarizing and reporting results. The literature for the scoping review was found using online databases, reference lists and hand searched journals. Data were charted and sorted inductively according to key themes. A final review included 59 articles ranging over the years 1987-2015 with the largest group of studies falling in the period 2011-2015 (47.5%). Studies mostly employed quantitative (32.2%), qualitative (20.3%), systematic/literature review (18.6%) and mixed methods research approaches (11.9%). The scoping review highlighted a range of DTP strategies for transforming medical education. These include training for rural workforce, addressing context specific competencies to promote social accountability, promoting community engagement, and medical education partnerships. Viable models of DTP include community based education, distributed community engaged learning, discipline based clinical rotations, longitudinal clerkships and dedicated tracks focusing on rural issues. Shorter rural placements and supplemental rural tracks are also described. This scoping review showed a considerable amount of

  6. The Effect of Soil Education Project on Pre-School Children

    Science.gov (United States)

    Gulay, Hulya; Yilmaz, Sevket; Gullac, Esin Turan; Onder, Alev

    2010-01-01

    The objective of this study is to evaluate the efficiency of the first two group applications of the project named "We are Learning about the Soil with Tipitop and His Friends" within the scope of the project group activities of The Scientific and Technological Research Council of Turkey (TUBITAK) "Schools of Nature and…

  7. Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This Project Execution Plan documents the methodology for managing Project W-211. Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for the future waste treatment plant, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AN-102, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the River Protection Project (RF'P) Waste Treatment Facility and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump-based retrieval system for any DST. This Project Execution Plan (PEP), derived from the predecessor Project Management Plan, documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering

  8. Remediation Approach for the Integrated Facility Disposition Project at the Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Kirk, P.G.; Stephens, Jr.J.M.

    2009-01-01

    The Integrated Facility Disposition Project (IFDP) is a multi-billion-dollar remediation effort being conducted by the U.S. Department of Energy (DOE) Office of Environmental Management in Oak Ridge, Tennessee. The scope of the IFDP encompasses remedial actions related to activities conducted over the past 65 years at the Oak Ridge National Laboratory (ORNL) and the Y-12 National Security Complex (Y-12). Environmental media and facilities became contaminated as a result of operations, leaks, spills, and past waste disposal practices. ORNL's mission includes energy, environmental, nuclear security, computational, and materials research and development. Remediation activities will be implemented at ORNL as part of IFDP scope to meet remedial action objectives established in existing and future decision documents. Remedial actions are necessary (1) to comply with environmental regulations to reduce human health and environmental risk and (2) to release strategic real estate needed for modernization initiatives at ORNL. The scope of remedial actions includes characterization, waste management, transportation and disposal, stream restoration, and final remediation of contaminated soils, sediments, and groundwater. Activities include removal of at or below-grade substructures such as slabs, underground utilities, underground piping, tanks, basins, pits, ducts, equipment housings, manholes, and concrete-poured structures associated with equipment housings and basement walls/floors/columns. Many interim remedial actions involving groundwater and surface water that have not been completed are included in the IFDP remedial action scope. The challenges presented by the remediation of Bethel Valley at ORNL are formidable. The proposed approach to remediation endeavors to use the best available technologies and technical approaches from EPA and other federal agencies and lessons learned from previous cleanup efforts. The objective is to minimize cost, maximize remedial

  9. An advanced configuration management system for full scope power plant simulators

    International Nuclear Information System (INIS)

    Storm, J.; Goemann, A.

    1996-01-01

    In August 1993 KSG Kraftwerks-Simulator-Gesellschaft, Germany, awarded a contract to STN ATLAS Elektronik for the delivery of two full scope replica training simulators for the German BWR plants Isar 1 and Philipsburg 1, known as the double simulator project S30 (S31/S32). For both projects a computer based Configuration Management System (CMS) was required to overcome deficiencies of older simulator systems in terms of limited upgrade and maintenance capabilities and incomplete documentation. The CMS allows complete control over the entire simulator system covering all software- and hardware-items and therewith exceed quality assurance requirements as defined in ISO 9000-3 which gives recommendations for software configuration management only. The system is realized under the project using the UNIX based relational database system EMPRESS and is in use as a development- and maintenance-tool to improve simulator quality and ensure simulator configuration integrity

  10. FY 1991 Task plans for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    1991-04-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to populations and individuals. The objectives of work in Fiscal Year (FY) 1991 are to analyze data and models used in Phase 1 and restructure the models to increase accuracy and reduce uncertainty in dose estimation capability. Databases will be expanded and efforts will begin to determine the appropriate scope (space, time, radionuclides, pathways and individuals/population groups) and accuracy (level of uncertainty in dose estimates) for the project. Project scope and accuracy requirements, once defined, can be translated into additional model and data requirements later in the project. Task plans for FY 1991 have been prepared based on activities approved by the Technical Steering Panel (TSP) in October 1990 and mid-year revisions discussed at the TSP planning/budget workshop in February 1991. The activities can be divided into two broad categories: (1) model and data development and evaluation, (2) project, technical and communication support. 3 figs., 1 tab

  11. Halden reactor project

    International Nuclear Information System (INIS)

    1981-01-01

    Accomplishments realized during 1981 are summarized in this report. Reactor safety considerations continue to be the prime motivation for the Halden fuel programme. A major part of the experimental efforts deal with effects of loss-of-coolant accidents (LOCA) on fuel thermal and dimensional response. Fuel defect mechanisms and probabilities, both during safety related accident sequences and in response to operational transients, are also extensively studied. The programme encompasses current fuel designs as well as design modifications expected to improve performance. The Halden Project is expanding its work on process computer applications with emphasis on operator-process communication and operator guidance systems. This includes human factors experiments, control room layout and design, alarm handling systems and core surveillance. The principal tool being developed for performing realistic experiments in this field is the new control room with a full scope training simulator model of a nuclear power plant

  12. FINDING SOLUTIONS AT THE WEST VALLEY DEMONSTRATION PROJECT

    International Nuclear Information System (INIS)

    Drake, John L.; Gramling, James M.; Houston, Helene M.

    2003-01-01

    The United States Department of Energy Office of Environmental Management (DOE-EM) faces a number of sizeable challenges as it begins to transform its mission from managing risk to reducing and eliminating risk throughout the DOE Complex. One of the greatest challenges being addressed by DOE-EM as this transformation takes place is accelerating the deactivation and decommissioning of thousands of facilities within the DOE Complex that were once used to support nuclear-related programs and projects. These facilities are now unused and aging. Finding solutions to complete the cleanup of these aging facilities more safely, efficiently, and effectively while reducing costs is critical to successfully meeting DOE-EM's cleanup challenge. The Large-Scale Demonstration and Deployment Project (LSDDP) of Hot Cells at the West Valley Demonstration Project (WVDP) is a near-term project funded through the DOE's National Energy Technology Laboratory (DOE-NETL) for the specific purpose of identifying, evaluating, demonstrating, and deploying commercially available technologies that are capable of streamlining the cleanup of hot cells in unused facilities while improving worker safety. Two DOE project sites are participating in this LSDDP: the WVDP site in West Valley, New York and the Hanford River Corridor Project (RCP) site in Richland, Washington. The WVDP site serves as the host site for the project. Technologies considered for demonstration and potential deployment at both LSDDP sites are targeted for application in hot cells that require the use of remote and semi-remote techniques to conduct various cleanup-related activities because of high radiation or high contamination levels. These hot cells, the type of cleanup activities being conducted, and technologies selected for demonstration are the main topics discussed in this paper. The range of cleanup-related activities addressed include in-situ characterization, size-reduction, contamination control, decontamination, in

  13. Scope Complexity Options Risks Excursions (SCORE) Version 3.0 Mathematical Description.

    Energy Technology Data Exchange (ETDEWEB)

    Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Samberson, Jonell Nicole [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Shettigar, Subhasini [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jungels, John [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Welch, Kimberly M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jones, Dean A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-03-01

    The purpose of the Scope, Complexity, Options, Risks, Excursions (SCORE) model is to estimate the relative complexity of design variants of future warhead options. The results of this model allow those considering these options to understand the complexity tradeoffs between proposed warhead options. The core idea of SCORE is to divide a warhead option into a well- defined set of scope elements and then estimate the complexity of each scope element against a well understood reference system. The uncertainty associated with estimates can also be captured. A weighted summation of the relative complexity of each scope element is used to determine the total complexity of the proposed warhead option or portions of the warhead option (i.e., a National Work Breakdown Structure code). The SCORE analysis process is a growing multi-organizational Nuclear Security Enterprise (NSE) effort, under the management of the NA- 12 led Enterprise Modeling and Analysis Consortium (EMAC), that has provided the data elicitation, integration and computation needed to support the out-year Life Extension Program (LEP) cost estimates included in the Stockpile Stewardship Management Plan (SSMP).

  14. 22 CFR 34.2 - Scope.

    Science.gov (United States)

    2010-04-01

    ... Federal agency, any foreign country or any political subdivision thereof, or any public international... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Scope. 34.2 Section 34.2 Foreign Relations DEPARTMENT OF STATE CLAIMS AND STOLEN PROPERTY DEBT COLLECTION General Provisions § 34.2 Scope. (a) Except as...

  15. 12 CFR 19.241 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Scope. 19.241 Section 19.241 Banks and Banking..., and Debarment of Accountants From Performing Audit Services § 19.241 Scope. This subpart, which... their accounting firms from performing independent audit and attestation services required by section 36...

  16. 12 CFR 334.40 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Scope. 334.40 Section 334.40 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND STATEMENTS OF GENERAL POLICY FAIR CREDIT REPORTING Duties of Furnishers of Information § 334.40 Scope. This subpart applies to a financial institution or...

  17. 10 CFR 63.141 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Scope. 63.141 Section 63.141 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Quality Assurance § 63.141 Scope. As used in this part, quality assurance comprises all those...

  18. 10 CFR 72.2 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Scope. 72.2 Section 72.2 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General Provisions § 72.2 Scope. (a) Except...

  19. 6 CFR 7.2 - Scope.

    Science.gov (United States)

    2010-01-01

    ..., National Industrial Security Program, and its implementing directives. (c) This part is independent of and... 6 Domestic Security 1 2010-01-01 2010-01-01 false Scope. 7.2 Section 7.2 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CLASSIFIED NATIONAL SECURITY INFORMATION § 7.2 Scope...

  20. 19 CFR 101.0 - Scope.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Scope. 101.0 Section 101.0 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY GENERAL PROVISIONS § 101.0 Scope. This part sets forth general regulations governing the authority of Customs...

  1. Project Specific Quality Assurance Plan Project (QAPP) W-211 Initial Tank Retrieval Systems (ITRS)

    International Nuclear Information System (INIS)

    HALL, L.R.

    2000-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Project Hanford Quality Assurance Program is implemented by CH2M HILL Hanford Group Inc (CHG) for managing the Initial Tank Retrieval Systems (ITRS), Project W-211. This QAPP is responsive to the CHG Quality Assurance Program Description (QAPD) (LMH-MP-599) which provides direction for compliance to 10 CFR 830 120, ''Nuclear Safety Management, Quality Assurance Requirements'', and DOE Order 5700 6C, ''Quality Assurance'' Project W-211 modifies existing facilities and provides systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for future processing plants, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. This project includes the design, procurement, construction, startup and turnover of these retrieval systems This QAPP identifies organizational structures and responsibilities. Implementing procedures used by CHG project management can be found in the CHG Quality Assurance Program (CHG QAP) Implementation Matrix located in HNF-IP-0842, Volume XI, Attachment Proposed verification and inspection activities for critical items within the scope of project W-211 are identified in Attachment 1 W-211. Project participants will identify the implementing procedures used by their organization within their QAF'Ps. This project specific QAPP is used to identify requirements in addition to the QAPD and provide, by reference, additional information to other project documents

  2. Commercial agreements and documentation relevant for project financing renewable energy schemes

    International Nuclear Information System (INIS)

    1997-01-01

    Renewable energy projects covered by the NFFO Orders are distinguished by the fact that the key contract in any project is in effect a standard form contract in the form of the Power Purchase Agreement with the Non-Fossil Purchasing Agency Limited (''NFPA''). However our research has indicated that general contract standardization is unlikely to be practicable in the short term, although it is thought that the production of a range of specimen documents in the context of this study with input from various representative industry associations could lead to a more consistent approach to the negotiation and structuring of projects and facilitate the presentation of projects at the funding stage. We have produced a suite of documents which are specimens of the sorts of agreements that lenders are likely to find acceptable. The range of documents which we have produced covers the principal contractual arrangements for a typical renewable energy project (including full text or abridged agreements), for a land lease and for agreements for design and build, operation and maintenance, waste supply, wind lease, landfill gas, and forestry residue supply. We have produced an insurance scope of cover and financing documentation including a due diligence check list, term sheet, and a facility agreement with related security documentation. (author)

  3. 21 CFR 99.1 - Scope.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Scope. 99.1 Section 99.1 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL DISSEMINATION OF INFORMATION ON UNAPPROVED/NEW USES FOR MARKETED DRUGS, BIOLOGICS, AND DEVICES General Information § 99.1 Scope. (a) This...

  4. 12 CFR 7.5000 - Scope.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Scope. 7.5000 Section 7.5000 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY BANK ACTIVITIES AND OPERATIONS Electronic Activities § 7.5000 Scope. This subpart applies to a national bank's use of technology to deliver services and...

  5. 49 CFR 195.48 - Scope.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Scope. 195.48 Section 195.48 Transportation Other... Annual, Accident, and Safety-Related Condition Reporting § 195.48 Scope. This subpart prescribes... 7000-1.1) required by § 195.49 or to provide the estimate of total miles that could affect high...

  6. 19 CFR 173.0 - Scope.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 2 2010-04-01 2010-04-01 false Scope. 173.0 Section 173.0 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY (CONTINUED) ADMINISTRATIVE REVIEW IN GENERAL § 173.0 Scope. This part deals with the general authority of review, the...

  7. 30 CFR 906.1 - Scope.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Scope. 906.1 Section 906.1 Mineral Resources... OF SURFACE MINING OPERATIONS WITHIN EACH STATE COLORADO § 906.1 Scope. This part contains all rules applicable only within Colorado that have been adopted under the Surface Mining Control and Reclamation Act...

  8. SCOPE, Shipping Cask Optimization and Parametric Evaluation

    International Nuclear Information System (INIS)

    2002-01-01

    1 - Description of program or function: Given the neutron and gamma-ray shielding requirements as input, SCOPE may be used as a conceptual design tool for the evaluation of various casks designed to carry square fuel assemblies, circular canisters of nuclear waste material, or circular canisters containing 'intact' spent-fuel assemblies. It may be used to evaluate a specific design or to search for the maximum number of full assemblies (or canisters) that might be shipped in a given type of cask. In the 'search' mode, SCOPE will use built-in packing arrangements and the tabulated shielding requirements input by the user to 'design' a cask carrying one fuel assembly (or canister); it will then continue to increment the number of assemblies (or canisters) until one or more of the design limits can no longer be met. In each case (N = 1,2,3...), SCOPE will calculate the steady-state temperature distribution throughout the cask and perform a complete 1-D space/time transient thermal analysis following a postulated half-hour fire; then it will edit the characteristic dimensions of the cask (including fins, if required), the total weight of the loaded case, the steady-state temperature distribution at selected points, and the maximum transient temperature in key components. With SCOPE, the effects of various design changes may be evaluated quickly and inexpensively. 2 - Method of solution: SCOPE assumes that the user has already made an independent determination of the neutron and gamma-ray shielding requirements for the particular type of cask(s) under study. The amount of shielding required obviously depends on the type of spent fuel or nuclear waste material, its burnup and/or exposure, the decay time, and the number of assemblies or canisters in the cask. Source terms (and spectra) for spent PWR and BWR fuel assemblies are provided at each of 17 decay times, along with recommended neutron and gamma-ray shield thicknesses for Pb, Fe, and U-metal casks containing a

  9. Project for construction of a new nuclear unit in Armenia

    International Nuclear Information System (INIS)

    2010-01-01

    WorleyParsons Project Description Scope of work: Management Services for Implementation of the Project on Construction of New Nuclear Unit(s) in the Republic of Armenia. Client: Ministry of Energy and Natural Resources (MENR), Republic of Armenia •Contract signed on 29 of May 2009 •Project divided into 4 Phases. Addendum 1 covers phase I and II signed on 27 of July. Contract entered into force 7 of August

  10. Independent management and financial review, Yucca Mountain Project, Nevada. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-15

    The Yucca Mountain Project is one part of the Department of Energy`s Office of Civilian Radioactive Waste Management Program (the Program) which was established by the Nuclear Waste Policy Act of 1982, and as amended in 1987. The Program`s goal is to site the nation`s first geologic repository for the permanent disposal of high-level nuclear waste, in the form of spent fuel rod assemblies, generated by the nuclear power industry and a smaller quantity of Government radioactive waste. The Program, which also encompasses the transportation system and the multipurpose canister system was not the subject of this Report. The subject of this Review was only the Yucca Mountain Project in Nevada. While the Review was directed toward the Yucca Mountain Project rather than the Program as a whole, there are certain elements of the Project which cannot be addressed except through discussion of some Program issues. An example is the Total System Life Cycle Cost addressed in Section 7 of this report. Where Program issues are discussed in this Report, the reader is reminded of the scope limitations of the National Association of Regulatory Utility Commissioners (NARUC) contract to review only the Yucca Mountain Project. The primary scope of the Review was to respond to the specific criteria contained in the NARUC scope of work. In responding to these criteria, the Review Team understood that some interested parties have expressed concern over the requirements of the Nuclear Waste Policy Act relative to the Yucca Mountain Project and the nature of activities currently being carried out by the Department of Energy at the Yucca Mountain Project site. The Review Team has attempted to analyze relevant portions of the Nuclear Waste Policy Act as Amended, but has not conducted a thorough analysis of this legislation that could lead to any specific legal conclusions about all aspects of it.

  11. Independent management and financial review, Yucca Mountain Project, Nevada. Final report

    International Nuclear Information System (INIS)

    1995-01-01

    The Yucca Mountain Project is one part of the Department of Energy's Office of Civilian Radioactive Waste Management Program (the Program) which was established by the Nuclear Waste Policy Act of 1982, and as amended in 1987. The Program's goal is to site the nation's first geologic repository for the permanent disposal of high-level nuclear waste, in the form of spent fuel rod assemblies, generated by the nuclear power industry and a smaller quantity of Government radioactive waste. The Program, which also encompasses the transportation system and the multipurpose canister system was not the subject of this Report. The subject of this Review was only the Yucca Mountain Project in Nevada. While the Review was directed toward the Yucca Mountain Project rather than the Program as a whole, there are certain elements of the Project which cannot be addressed except through discussion of some Program issues. An example is the Total System Life Cycle Cost addressed in Section 7 of this report. Where Program issues are discussed in this Report, the reader is reminded of the scope limitations of the National Association of Regulatory Utility Commissioners (NARUC) contract to review only the Yucca Mountain Project. The primary scope of the Review was to respond to the specific criteria contained in the NARUC scope of work. In responding to these criteria, the Review Team understood that some interested parties have expressed concern over the requirements of the Nuclear Waste Policy Act relative to the Yucca Mountain Project and the nature of activities currently being carried out by the Department of Energy at the Yucca Mountain Project site. The Review Team has attempted to analyze relevant portions of the Nuclear Waste Policy Act as Amended, but has not conducted a thorough analysis of this legislation that could lead to any specific legal conclusions about all aspects of it

  12. Summaries of studies carried out in the NKS/BOK-2 project. Technical report

    International Nuclear Information System (INIS)

    Palsson, S.E.

    2002-12-01

    Summaries of studies carried out in the NKSBOK-2 project, Radiological and Environmental Consequences. The structure of the project as such is described in NKS-64, Radiological and Environmental Consequences - Final Report of the Nordic Nuclear Safety Research Project BOK-2. That report also includes compilations based on the summaries presented in this report. The project was carried out 1998-2001 with participants from all the Nordic countries. Representatives from the Baltic States were also invited to some of the meetings and seminars. The project consisted of work on terrestrial and marine radioecology and had a broad scope in order to enable participation of research groups with various fields of interest. The topics included improving assessment of old and recent fallout, use of radionuclides as tracers in Nordic marine areas, improving assessment of internal doses and use of mass spectrometry in radioecology. This report is a compilation of summaries from each research group, 32 papers in all, and gives references to papers published in scientific journals. Some of the studies have been described previously, at least to some degree, in NKS-70, Proceedings of the 8 th Nordic Seminar on Radioecology, 25-28 February 2001, Rovaniemi, Finland. (au)

  13. 4D CAD Based Method for Supporting Coordination of Urban Subsurface Utility Projects

    NARCIS (Netherlands)

    olde Scholtenhuis, Léon Luc; Hartmann, T.; Doree, Andries G.

    Coordinators of inner city utility construction works face increasing difficulty in managing their projects due to tight physical restrictions, strict deadlines and growing stakeholder fragmentation. This paper therefore presents a 4D CAD based coordination method that supports project plan scoping,

  14. Sorbent Scoping Studies

    International Nuclear Information System (INIS)

    Chancellor, Christopher John

    2016-01-01

    The Los Alamos National Laboratory-Carlsbad Operations (LANL-CO) office was tasked by the DOE CBFO, Office of the Manager to perform a review of the acceptable knowledge (AK) to identify the oxidizers and sorbents in transuranic (TRU) waste streams, to conduct scoping studies on the oxidizers and sorbents identified in AK review to inform the Quality Level 1 (QL1) testing, and to conduct a series of QL1 tests to provide the scientific data to support a basis of knowledge document for determining the criteria for (1) accepting waste at the Waste Isolation Pilot Plant (WIPP) without treatment, (2) determining waste that will require treatment, and (3) if treatment is required, how the treatment must be performed. The purpose of this report is to present the results of the AK review of sorbents present in active waste streams, provide a technical analysis of the sorbent list, report the results of the scoping studies for the fastest-burning organic sorbent, and provide the list of organic and inorganic sorbents to be used in the development of a Test Plan for Preparation and Testing of Sorbents Mixed with Oxidizer found in Transuranic Waste (DWT-TP-001). The companion report, DWT-RPT-001, Oxidizer Scoping Studies, has similar information for oxidizers identified during the AK review of TRU waste streams. The results of the oxidizer and sorbent scoping studies will be used to inform the QL1 test plan. The QL1 test results will support the development of a basis of knowledge document that will evaluate oxidizing chemicals and sorbents in TRU waste and provide guidance for treatment.

  15. Sorbent Scoping Studies

    Energy Technology Data Exchange (ETDEWEB)

    Chancellor, Christopher John [Los Alamos National Lab. (LANL), Carlsbad, NM (United States). Difficult Waste Team

    2016-11-14

    The Los Alamos National Laboratory–Carlsbad Operations (LANL-CO) office was tasked by the DOE CBFO, Office of the Manager to perform a review of the acceptable knowledge (AK) to identify the oxidizers and sorbents in transuranic (TRU) waste streams, to conduct scoping studies on the oxidizers and sorbents identified in AK review to inform the Quality Level 1 (QL1) testing, and to conduct a series of QL1 tests to provide the scientific data to support a basis of knowledge document for determining the criteria for (1) accepting waste at the Waste Isolation Pilot Plant (WIPP) without treatment, (2) determining waste that will require treatment, and (3) if treatment is required, how the treatment must be performed. The purpose of this report is to present the results of the AK review of sorbents present in active waste streams, provide a technical analysis of the sorbent list, report the results of the scoping studies for the fastest-burning organic sorbent, and provide the list of organic and inorganic sorbents to be used in the development of a Test Plan for Preparation and Testing of Sorbents Mixed with Oxidizer found in Transuranic Waste (DWT-TP-001). The companion report, DWT-RPT-001, Oxidizer Scoping Studies, has similar information for oxidizers identified during the AK review of TRU waste streams. The results of the oxidizer and sorbent scoping studies will be used to inform the QL1 test plan. The QL1 test results will support the development of a basis of knowledge document that will evaluate oxidizing chemicals and sorbents in TRU waste and provide guidance for treatment.

  16. A project-based system for including farmers in the EU ETS

    DEFF Research Database (Denmark)

    Brandt, Urs Steiner; Svendsen, Gert Tinggaard

    2011-01-01

    as ‘the missing link’ in past climate negotiations. We argue that farmers have relatively low marginal reduction costs and that consequences in terms of the effect on permit price and technology are overall positive in the EU Emission Trading System (ETS). Thus, we propose a project-based system......Farmers in the EU do not trade greenhouse gases under the Kyoto agreement. This is an empirical puzzle because agriculture is a significant contributor of greenhouse gases (GHG) in the EU and may harvest private net gains from trade. Furthermore, the US has strongly advocated land-use practices...... for including the farming practices in the EU ETS that reduces the uncertainty from measuring emission reduction in this sector. The system encourages GHG reduction either by introducing a new and less polluting practice or by reducing the polluting activity. When doing so, farmers will receive GHG permits...

  17. 21 CFR 1311.01 - Scope.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Scope. 1311.01 Section 1311.01 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE REQUIREMENTS FOR ELECTRONIC ORDERS AND PRESCRIPTIONS (Eff. 6.... For the convenience of the user, the revised text is set forth as follows: § 1311.01 Scope. This part...

  18. 21 CFR 328.1 - Scope.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 5 2010-04-01 2010-04-01 false Scope. 328.1 Section 328.1 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS FOR HUMAN USE OVER-THE-COUNTER DRUG PRODUCTS INTENDED FOR ORAL INGESTION THAT CONTAIN ALCOHOL General Provisions § 328.1 Scope...

  19. 21 CFR 54.3 - Scope.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Scope. 54.3 Section 54.3 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL FINANCIAL DISCLOSURE BY CLINICAL INVESTIGATORS § 54.3 Scope. The requirements in this part apply to any applicant who submits a marketing...

  20. 33 CFR 64.03 - Scope.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Scope. 64.03 Section 64.03... STRUCTURES, SUNKEN VESSELS AND OTHER OBSTRUCTIONS General § 64.03 Scope. (a) Except as provided in paragraph... jurisdiction of the United States and, on the high seas, structures owned or operated by persons subject to the...

  1. Prioritization of forest restoration projects: Tradeoffs between wildfire protection, ecological restoration and economic objectives

    Science.gov (United States)

    Kevin C. Vogler; Alan A. Ager; Michelle A. Day; Michael Jennings; John D. Bailey

    2015-01-01

    The implementation of US federal forest restoration programs on national forests is a complex process that requires balancing diverse socioecological goals with project economics. Despite both the large geographic scope and substantial investments in restoration projects, a quantitative decision support framework to locate optimal project areas and examine...

  2. Development of the AuScope Australian Earth Observing System

    Science.gov (United States)

    Rawling, T.

    2017-12-01

    Advances in monitoring technology and significant investment in new national research initiatives, will provide significant new opportunities for delivery of novel geoscience data streams from across the Australian continent over the next decade. The AuScope Australian Earth Observing System (AEOS) is linking field and laboratory infrastructure across Australia to form a national sensor array focusing on the Solid Earth. As such AuScope is working with these programs to deploy observational infrastructure, including MT, passive seismic, and GNSS networks across the entire Australian Continent. Where possible the observational grid will be co-located with strategic basement drilling in areas of shallow cover and tied with national reflection seismic and sampling transects. This integrated suite of distributed earth observation and imaging sensors will provide unprecedented imaging fidelity of our crust, across all length and time scales, to fundamental and applied researchers in the earth, environmental and geospatial sciences. The AEOS will the Earth Science community's Square Kilometer Array (SKA) - a distributed telescope that looks INTO the earth rather than away from it - a 10 million SKA. The AEOS is strongly aligned with other community strategic initiatives including the UNCOVER research program as well as other National Collaborative Research Infrastructure programs such as the Terrestrial Environmental Research Network (TERN) and the Integrated Marine Observing System (IMOS) providing an interdisciplinary collaboration platform across the earth and environmental sciences. There is also very close alignment between AuScope and similar international programs such as EPOS, the USArray and EarthCube - potential collaborative linkages we are currently in the process of pursuing more fomally. The AuScope AEOS Infrastructure System is ultimately designed to enable the progressive construction, refinement and ongoing enrichment of a live, "FAIR" four

  3. Trends in simulation and the Krsko full scope simulator

    International Nuclear Information System (INIS)

    Boire, R.; Chatlani, M.

    1998-01-01

    The nuclear power plant simulation industry is a fast-paced industry yielding continual development as a result of innovations in technology and customer requirements. This paper will discuss the current trends in simulator requirements, the status of simulation technology and the expected future developments, particularly in the context of the NPP Krsko full scope simulator. CAE Electronics has been awarded the contract for the design, construction, integration, testing and commissioning of the NPP Krsko full scope simulator (KFSS) by Nuklearna elektrarna Krsko (NEK). KFSS, as an integral part of the NPP Krsko Modernization plan, has been the subject of an extensive procurement process. KFSS will also take into account the steam generator replacement and plant uprate projects which will be delivered to provide initial training in the modernized plant configuration. As a result, the completed KFSS will meet NEK's goals for reliable training in safe plant operation as well as the licensing requirements of the Slovenian Nuclear Safety Administration. KFSS will be a state-of-the-art facility featuring high fidelity process and control models, proven technology and superior maintainability that will push the envelope of traditional simulator uses. In addition to serving its role as a high quality training vehicle, KFSS will be used for engineering purposes including procedure development and validation, optimization of plant operation and study and validation of plant modifications. KFSS models will be built for the most part with CAE's ROSE TM toolset. ROSE, is a component-based, visual programming environment for the creation, testing, integration and management of simulator models and supporting virtual panels. The NSSS will be simulated using the ANTHEM two-phase drift flux model, while be simulated using the COMET two-group, three-dimensional model. Software design and testing will be supported by an extensive series of quality procedures throughout the software

  4. Managing your engineering consultants: Steps for simultaneously improving operations, project implementation, and your bottom line

    International Nuclear Information System (INIS)

    Kirchen, E.R.; Perilloux, B.L.

    1997-01-01

    The domestic oil and gas industry has responded to depleting reserves and increasing operating costs by downsizing the overhead required to maintain production and processing facilities. For many companies this downsizing has resulted in a reduced in-house engineering staff and a greater reliance on consulting engineering services. To get the most benefit from consulting engineering companies, the partnership between consultants and the oil and gas company needs to be carefully considered. Unfortunately, these partnerships are often developed at the home office with visionary goals in mind, only to be implemented reluctantly on a local level. A better strategy is to implement partnering tools on the local level and allow these partnerships to develop naturally, and at times, uniquely, at each location. The following such tools detailed in this paper are: manpower leveraging -- using field-trained consulting engineers to address project design/implementation and field/construction support so that the operating company's engineers may focus on management and detailed development of high-return projects; enhanced project scope and design review -- developing and reviewing project scope(s) and preliminary engineering designs to minimize engineering/construction costs as well as optimize the operability and constructability of the project; and consulting rate standardization -- understanding and structuring the consultant's rates so that neither side is exploited and so that the project is staffed in the interest of project execution and not maximum profits for the consultant

  5. 34 CFR 472.34 - Under what circumstances may a project continue if a partner withdraws?

    Science.gov (United States)

    2010-07-01

    ... project continue if a partner withdraws? (a) A project may continue despite the withdrawal of a partner... the grant agreement by the partner that is withdrawing without a change in the project's scope or... 34 Education 3 2010-07-01 2010-07-01 false Under what circumstances may a project continue if a...

  6. Scope and procedures of fuel management for PWR nuclear power plant

    International Nuclear Information System (INIS)

    Yao Zenghua

    1997-01-01

    The fuel management scope of PWR nuclear power plant includes nuclear fuel purchase and spent fuel disposal, ex-core fuel management, in-core fuel management, core management and fuel assembly behavior follow up. A suit of complete and efficient fuel management procedures have to be created to ensure the quality and efficiency of fuel management work. The hierarchy of fuel management procedure is divided into four levels: main procedure, administration procedure, implement procedure and technic procedure. A brief introduction to the fuel management scope and procedures of PWR nuclear power plant are given

  7. 32 CFR 651.48 - Scoping process.

    Science.gov (United States)

    2010-07-01

    ... significantly affecting the environment will go through scoping unless extenuating circumstances make it... associated environmental controversy. (4) Importance of the affected environmental parameters. (5... the affected Army organization or installation. Such integration is encouraged. (f) Scoping procedures...

  8. Testing the robustness of Citizen Science projects: Evaluating the results of pilot project COMBER.

    Science.gov (United States)

    Chatzigeorgiou, Giorgos; Faulwetter, Sarah; Dailianis, Thanos; Smith, Vincent Stuart; Koulouri, Panagiota; Dounas, Costas; Arvanitidis, Christos

    2016-01-01

    Citizen Science (CS) as a term implies a great deal of approaches and scopes involving many different fields of science. The number of the relevant projects globally has been increased significantly in the recent years. Large scale ecological questions can be answered only through extended observation networks and CS projects can support this effort. Although the need of such projects is apparent, an important part of scientific community cast doubt on the reliability of CS data sets. The pilot CS project COMBER has been created in order to provide evidence to answer the aforementioned question in the coastal marine biodiversity monitoring. The results of the current analysis show that a carefully designed CS project with clear hypotheses, wide participation and data sets validation, can be a valuable tool for the large scale and long term changes in marine biodiversity pattern change and therefore for relevant management and conservation issues.

  9. The NIOSH Radiation Dose Reconstruction Project: managing technical challenges.

    Science.gov (United States)

    Moeller, Matthew P; Townsend, Ronald D; Dooley, David A

    2008-07-01

    Approximately two years after promulgation of the Energy Employees Occupational Illness Compensation Program Act, the National Institute for Occupational Safety and Health Office of Compensation and Analysis Support selected a contractor team to perform many aspects of the radiation dose reconstruction process. The project scope and schedule necessitated the development of an organization involving a comparatively large number of health physicists. From the initial stages, there were many technical and managerial challenges that required continuous planning, integration, and conflict resolution. This paper identifies those challenges and describes the resolutions and lessons learned. These insights are hopefully useful to managers of similar scientific projects, especially those requiring significant data, technical methods, and calculations. The most complex challenge has been to complete defensible, individualized dose reconstructions that support timely compensation decisions at an acceptable production level. Adherence to applying claimant-favorable and transparent science consistent with the requirements of the Act has been the key to establishing credibility, which is essential to this large and complex project involving tens of thousands of individual stakeholders. The initial challenges included garnering sufficient and capable scientific staff, developing an effective infrastructure, establishing necessary methods and procedures, and integrating activities to ensure consistent, quality products. The continuing challenges include maintaining the project focus on recommending a compensation determination (rather than generating an accurate dose reconstruction), managing the associated very large data and information management challenges, and ensuring quality control and assurance in the presence of an evolving infrastructure. The lessons learned concern project credibility, claimant favorability, project priorities, quality and consistency, and critical

  10. On the Economics of Innovation Projects Product Experimentation in the Music Industry

    OpenAIRE

    Mark Lorenzen; Lars Frederiksen

    2005-01-01

    The paper is conceptual, combining project and economic organization literatures in order to explain the organization and management of market-based projects. It dedicates particular focus to projects set up in order to facilitate product innovation through experimentation. It investigates the internal vs. market economies of scale and scope related to projects, as well as the issues of governance, planning and coordination related to reaping such economies. Incorporating trans...

  11. Residential ventilation standards scoping study

    Energy Technology Data Exchange (ETDEWEB)

    McKone, Thomas E.; Sherman, Max H.

    2003-10-01

    The goals of this scoping study are to identify research needed to develop improved ventilation standards for California's Title 24 Building Energy Efficiency Standards. The 2008 Title 24 Standards are the primary target for the outcome of this research, but this scoping study is not limited to that timeframe. We prepared this scoping study to provide the California Energy Commission with broad and flexible options for developing a research plan to advance the standards. This document presents the findings of a scoping study commissioned by the Public Interest Energy Research (PIER) program of the California Energy Commission to determine what research is necessary to develop new residential ventilation requirements for California. This study is one of three companion efforts needed to complete the job of determining the ventilation needs of California residences, determining the bases for setting residential ventilation requirements, and determining appropriate ventilation technologies to meet these needs and requirements in an energy efficient manner. Rather than providing research results, this scoping study identifies important research questions along with the level of effort necessary to address these questions and the costs, risks, and benefits of pursuing alternative research questions. In approaching these questions and corresponding levels of effort, feasibility and timing were important considerations. The Commission has specified Summer 2005 as the latest date for completing this research in time to update the 2008 version of California's Energy Code (Title 24).

  12. Assessing local resources and culture before instituting quality improvement projects.

    Science.gov (United States)

    Hawkins, C Matthew

    2014-12-01

    The planning phases of quality improvement projects are commonly overlooked. Disorganized planning and implementation can escalate chaos, intensify resistance to change, and increase the likelihood of failure. Two important steps in the planning phase are (1) assessing local resources available to aid in the quality improvement project and (2) evaluating the culture in which the desired change is to be implemented. Assessing local resources includes identifying and engaging key stakeholders and evaluating if appropriate expertise is available for the scope of the project. This process also involves engaging informaticists and gathering available IT tools to plan and automate (to the extent possible) the data-gathering, analysis, and feedback steps. Culture in a department is influenced by the ability and willingness to manage resistance to change, build consensus, span boundaries between stakeholders, and become a learning organization. Allotting appropriate time to perform these preparatory steps will increase the odds of successfully performing a quality improvement project and implementing change. Copyright © 2014 American College of Radiology. Published by Elsevier Inc. All rights reserved.

  13. INSIGHT: an integrated scoping analysis tool for in-core fuel management of PWR

    International Nuclear Information System (INIS)

    Yamamoto, Akio; Noda, Hidefumi; Ito, Nobuaki; Maruyama, Taiji.

    1997-01-01

    An integrated software tool for scoping analysis of in-core fuel management, INSIGHT, has been developed to automate the scoping analysis and to improve the fuel cycle cost using advanced optimization techniques. INSIGHT is an interactive software tool executed on UNIX based workstations that is equipped with an X-window system. INSIGHT incorporates the GALLOP loading pattern (LP) optimization module that utilizes hybrid genetic algorithms, the PATMAKER interactive LP design module, the MCA multicycle analysis module, an integrated database, and other utilities. Two benchmark problems were analyzed to confirm the key capabilities of INSIGHT: LP optimization and multicycle analysis. The first was the single cycle LP optimization problem that included various constraints. The second one was the multicycle LP optimization problem that includes the assembly burnup limitation at rod cluster control (RCC) positions. The results for these problems showed the feasibility of INSIGHT for the practical scoping analysis, whose work almost consists of LP generation and multicycle analysis. (author)

  14. Effective Strategies for Achieving Scope of Practice Reform in Pennsylvania.

    Science.gov (United States)

    Carthon, J Margo Brooks; Wiltse Nicely, Kelly; Altares Sarik, Danielle; Fairman, Julie

    2016-05-01

    Current regulatory impediments prohibit advanced practice registered nurses from practicing to their full capacity. To examine the process of successful removal of scope of practice barriers in Pennsylvania under the Rx4PA legislation introduced in 2007. We used qualitative research techniques, including purposeful sampling of participants. Twelve stakeholder informed interviews were conducted between October 2013 and May 2014. Participants were closely involved with the development of the Rx4PA legislation. Thematic content analysis was performed to analyze our interviews. Interviews identified overarching themes, including the importance of leveraging years of grass roots advocacy, identifying political allies, and recognizing mutually beneficial compromises. The combination of timing, careful political maneuvering, and compromise were key to scope of practice reform in Pennsylvania and may be useful strategies for other states seeking similar practice changes. © The Author(s) 2016.

  15. Examining the scope of multibusiness health care firms: implications for strategy and financial performance.

    Science.gov (United States)

    Noorein Inamdar, S

    2007-08-01

    of services and investing in a variety of new noncore business opportunities including many for-profit ventures). Significant differences in financial performance among the strategies were found when controlling for payer reimbursement conditions. Specifically, in an unfavorable condition with high Medicaid and low commercial insurance, the Mission Based strategy performs significantly worse while the Entrepreneur strategy performs surprisingly well, in comparison with the other strategies. Findings suggest: (a) scope can be used to classify a large number of multibusiness health care firms into a taxonomy representing a small group of distinct corporate strategies, which are recognizable by senior management in the health care industry, (b) no single strategy dominates in performance across different payer profiles, instead there appears to be complementarities or fit between strategy and payer profiles that determines which firms perform well and which do not under different conditions, and (c) senior management of nonprofit health care firms are cross-subsidizing unprofitable patient care through ownership of nonpatient care businesses including for-profit ventures.

  16. What I Learned from the Ypsilanti Perry Preschool Project: A Teacher's Reflections

    Science.gov (United States)

    Derman-Sparks, Louise

    2016-01-01

    This article, written by one of the teachers in the Ypsilanti Perry Preschool Project (1962-1967), critically examines the prevailing narrative about the preschool project's relationship to the High/Scope Educational Foundation. It describes what the author and other teachers actually did, the principles that informed their practice, and…

  17. IRIS Assessment Plan for Uranium (Scoping and Problem Formulation Materials)

    Science.gov (United States)

    In January 2018, EPA released the IRIS Assessment Plan for Uranium (Oral Reference Dose) (Scoping and Problem Formulation Materials). An IRIS Assessment Plan (IAP) communicates to the public the plan for assessing each individual chemical and includes summary informatio...

  18. Research data management in academic institutions: A scoping review.

    Directory of Open Access Journals (Sweden)

    Laure Perrier

    Full Text Available The purpose of this study is to describe the volume, topics, and methodological nature of the existing research literature on research data management in academic institutions.We conducted a scoping review by searching forty literature databases encompassing a broad range of disciplines from inception to April 2016. We included all study types and data extracted on study design, discipline, data collection tools, and phase of the research data lifecycle.We included 301 articles plus 10 companion reports after screening 13,002 titles and abstracts and 654 full-text articles. Most articles (85% were published from 2010 onwards and conducted within the sciences (86%. More than three-quarters of the articles (78% reported methods that included interviews, cross-sectional, or case studies. Most articles (68% included the Giving Access to Data phase of the UK Data Archive Research Data Lifecycle that examines activities such as sharing data. When studies were grouped into five dominant groupings (Stakeholder, Data, Library, Tool/Device, and Publication, data quality emerged as an integral element.Most studies relied on self-reports (interviews, surveys or accounts from an observer (case studies and we found few studies that collected empirical evidence on activities amongst data producers, particularly those examining the impact of research data management interventions. As well, fewer studies examined research data management at the early phases of research projects. The quality of all research outputs needs attention, from the application of best practices in research data management studies, to data producers depositing data in repositories for long-term use.

  19. First, build the project team

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, J.C. [Duke/Fluor Daniel, Charlotte, NC (United States)

    1997-03-01

    The EPC consortium of American, Japanese and Indonesian companies has been formed to construct the first phase of the coal-fired Paiton Power Project in Indonesia under a lump sum turnkey contract. A Consortium Agreement defines the respective roles, scope and responsibilities, as well as allocation of risks and rewards for each member. The roles of members have been assigned to match their experience and expertise and a Division of Responsibility document has been drawn up for each stage of the project. The management of the project depends on an effective team aligning the consortium members to a common set of project goals and objectives. Communication and understanding are all important. The project team have overcome some of the challenges of differences in culture, language, contractual practice and experience between the members. Some of the systems which are in place to minimise the effect of these differences and to focus on the execution of the project are outlined. (UK)

  20. Web-based Data Mining to Systematically Determine Data Quality From the EarthScope USArray Seismic Observatory Project

    Science.gov (United States)

    Newman, R. L.; Lindquist, K. G.; Hansen, T. S.; Vernon, F. L.; Eakins, J.; Foley, S.

    2004-12-01

    When fully operational, the Transportable Array (TA) and Flexible Array (FA) components of the continent-scale EarthScope USArray seismic observatory project will provide telemetered real-time data from up to 600 stations. By the fifth year of the deployment the predicted total amount of data production for the TA and FA will be approximately 1500 Gb/yr and approximately 1000 Gb/yr respectively. In addition to delivering the data to the IRIS Data Management Center (DMC) for permanent archiving, the Array Network Facility (ANF) is charged with real-time data quality control, calibration, metadata storage and retrieval, network monitoring and local archiving. The Antelope real-time processing software provides the back-bone to this effort, supported by the Storage Resource Broker data replication/archiving system and the Nagios network monitoring tool. Real-time, web-based data mining, with support for multiple database schemas, is provided by an Antelope interface to both Perl and PHP scripting languages. This allows embedding of database functions in HTML. A suite of online tools allows query and graphical display of dynamic real-time sensor network parameters such as data latency, network topologies, and data return rates. Data and metadata are also web-accessible, for example XML trees of seismic data and graphical display of instrument response functions. The purpose of these tools is to provide the ANF, IRIS and end-users of USArray data with a real-time systematic method of determining data quality for the spatio-temporal area of interest. The tools are accessible at http://anf.ucsd.edu

  1. Office of River Protection: Simplifying Project management tools

    International Nuclear Information System (INIS)

    TAYLOR, D.G.

    2000-01-01

    The primary approach to the effort was to form a multi-organizational team comprised of federal and contractor staff to develop and implement the necessary tools and systems to manage the project. In late 1999 the DOE Manager of the Office of River Protection formed the Project Integration Office to achieve the objective of managing the efforts as a single project. The first major task, and the foundation upon which to base the development of all other tools, was the establishment of a single baseline of activities. However, defining a single scope schedule and cost was a difficult matter indeed. Work scopes were available throughout the project, but the level of detail and the integration of the activities existed primarily between working groups and individuals and not on a project-wide basis. This creates a situation where technical needs, logic flaws, resource balancing, and other similar integration needs are not elevated for management attention and resolution. It should be noted that probably 90% of the interface issues were known and being addressed. The key is simplifying the process and providing tangible assurance that the other 10% does not contain issues that can delay the project. Fortunately all of the contractors employed a common scheduling tool, which served as the basis for first communicating and then integrating baseline activities. Utilizing a powerful computer-based scheduling tool, it was soon possible to integrate the various schedules after the following was accomplished: Establishment of a scheduling specification (standardized input, coding, and approach to logic); and Clearly defined project assumptions

  2. HBR guide to project management

    CERN Document Server

    Harvard Business Review

    2013-01-01

    MEET YOUR GOALS—ON TIME AND ON BUDGET. How do you rein in the scope of your project when you’ve got a group of demanding stakeholders breathing down your neck? And map out a schedule everyone can stick to? And motivate team members who have competing demands on their time and attention? Whether you’re managing your first project or just tired of improvising, this guide will give you the tools and confidence you need to define smart goals, meet them, and capture lessons learned so future projects go even more smoothly. The HBR Guide to Project Management will help you: • Build a strong, focused team • Break major objectives into manageable tasks • Create a schedule that keeps all the moving parts under control • Monitor progress toward your goals • Manage stakeholders’ expectations • Wrap up your project and gauge its success

  3. Midwestern High-Level Radioactive Waste Transportation Project

    International Nuclear Information System (INIS)

    1993-01-01

    On February 17,1989, the Midwestern Office of The Council of State Governments and the US Department of Energy entered into a cooperative agreement authorizing the initiation of the Midwestern High-Level Radioactive Waste Transportation Project. The transportation project continued to receive funding from DOE through amendments to the original cooperative agreement, with December 31, 1993, marking the end of the initial 5-year period. This progress report reflects the work completed by the Midwestern Office from February 17,1989, through December 31,1993. In accordance with the scopes of work governing the period covered by this report, the Midwestern Office of The Council of State Governments has worked closely with the Midwestern High-Level Radioactive Waste Committee. Project staff have facilitated all eight of the committee's meetings and have represented the committee at meetings of DOE's Transportation Coordination Group (TCG) and Transportation External Coordination Working Group (TEC/WG). Staff have also prepared and submitted comments on DOE activities on behalf of the committee. In addition to working with the committee, project staff have prepared and distributed 20 reports, including some revised reports (see Attachment 1). Staff have also developed a library of reference materials for the benefit of committee members, state officials, and other interested parties. To publicize the library, and to make it more accessible to potential users, project staff have prepared and distributed regular notices of resource availability

  4. Waste Receiving and Processing Facility, Module 1: Volume 7, Project design criteria

    International Nuclear Information System (INIS)

    1992-03-01

    This Project Design Criteria document for the WRAP facility at the Hanford Site is presented within a systems format. The WRAP Module 1 facility has been categorized into eight (8) engineering systems for design purposes. These systems include: receiving, shipping and storage, nondestructive assay/nondestructive examination (NDA/NDE), waste process, internal transportation, building, heating ventilation and air conditioning (HVAC), process control, and utilities. Within each system section of this document, the system-specific requirements are identified. The scope of the system is defined, the design goals are identified and the functional requirements are detailed

  5. Proven approaches to organise a large decommissioning project, including the management of local stakeholder interests

    International Nuclear Information System (INIS)

    Rodriguez, A.

    2005-01-01

    Full text: Spanish experience holds a relatively important position in the field of the decommissioning of nuclear and radioactive facilities. Decommissioning projects of uranium concentrate mill facilities are near completion; some old uranium mine sites have already been restored; several projects for the dismantling of various small research nuclear reactors and a few pilot plants are at various phases of the dismantling process, with some already completed. The most notable Spanish project in this field is undoubtedly the decommissioning of the Vandellos 1 nuclear power plant that is currently ready to enter a safe enclosure, or dormancy, period. The management of radioactive wastes in Spain is undertaken by 'Empresa Nacional de Residuos Radioactivos, S.A.' (ENRESA), the Spanish national radioactive waste company, constituted in 1984. ENRESA operates as a management company, whose role is to develop radioactive waste management programmes in accordance with the policy and strategy approved by the Spanish Government. Its responsibilities include the decommissioning and dismantling of nuclear installations. Decommissioning and dismantling nuclear installations is an increasingly important topic for governments, regulators, industries and civil society. There are many aspects that have to be carefully considered, planned and organised in many cases well in advance of when they really need to be implemented. The goal of this paper is describe proven approaches relevant to organizing and managing large decommissioning projects, in particular in the case of Vandellos-1 NPP decommissioning. (author)

  6. Methodological challenges when doing research that includes ethnic minorities

    DEFF Research Database (Denmark)

    Morville, Anne-Le; Erlandsson, Lena-Karin

    2016-01-01

    minorities are included. Method: A thorough literature search yielded 21 articles obtained from the scientific databases PubMed, Cinahl, Web of Science and PsychInfo. Analysis followed Arksey and O’Malley’s framework for scoping reviews, applying content analysis. Results: The results showed methodological...

  7. Digital Display Integration Project Project Online 2.0

    International Nuclear Information System (INIS)

    Bardsley, J. N.

    1999-01-01

    transfer; and optimizing techniques to reduce communications bandwidth. Additional topics that will be addressed include: obtaining greater color control; minimization of seam widths in tiled displays; and the human factors that impact the efficient use of high resolution displays. The scope of the project will include both direct-view displays, for use by individuals and small groups, and projection systems for conference rooms and auditoriums

  8. EPC projects for EPR Flamanville 3 NPP

    International Nuclear Information System (INIS)

    Diaz, J.I.; Polo, J.; Aymerich, E.; Cubian, B.

    2010-01-01

    includes electro-transformers and electro-chlorinators, tanks, hydrogen evacuating system, pumps, pneumatic and manual valves, piping and instrumentation and control systems. - The activities covered in these projects are: Project Management; Integration of engineering solutions and possibilities; Solving existing interfaces (civil, mechanical, electrical,..); Procurement, purchasing and subcontracting; QA and QC for design, fabrication and test; Equipment erection; Commissioning and start-up - The most remarkable challenges in these projects are: New Nuclear Technology: EPR; New tools required: HTRI, FLOWMASTER, CATIA,..; No-Previous Experience with European Equipment Regulations; No-Previous Experience with French law for Nuclear Pressure Vessels (ESPN). Scope under Regulatory Body Surveillance; No-Previous Experience with French law for Nuclear Safety Transparency. Scope under Regulatory Body Surveillance. (authors)

  9. EPC projects for EPR Flamanville 3 NPP

    Energy Technology Data Exchange (ETDEWEB)

    Diaz, J.I.; Polo, J.; Aymerich, E.; Cubian, B. [Nuclear Generation Department, Iberdrola Ingenieria y Construccion, Avda. Manoteras 20, 28050 Madrid (Spain)

    2010-07-01

    includes electro-transformers and electro-chlorinators, tanks, hydrogen evacuating system, pumps, pneumatic and manual valves, piping and instrumentation and control systems. - The activities covered in these projects are: Project Management; Integration of engineering solutions and possibilities; Solving existing interfaces (civil, mechanical, electrical,..); Procurement, purchasing and subcontracting; QA and QC for design, fabrication and test; Equipment erection; Commissioning and start-up - The most remarkable challenges in these projects are: New Nuclear Technology: EPR; New tools required: HTRI, FLOWMASTER, CATIA,..; No-Previous Experience with European Equipment Regulations; No-Previous Experience with French law for Nuclear Pressure Vessels (ESPN). Scope under Regulatory Body Surveillance; No-Previous Experience with French law for Nuclear Safety Transparency. Scope under Regulatory Body Surveillance. (authors)

  10. The EarthScope Plate Boundary Observatory: Bringing Low Latency Data From Unimak Island, Alaska

    Science.gov (United States)

    Feaux, K.; Mencin, D.; Jackson, M.; Gallaher, W.; Pauk, B.; Smith, S.

    2008-05-01

    The Plate Boundary Observatory (PBO), part of the NSF-funded EarthScope project, will complete the installation of a fourteen station GPS network on Unimak Island, Alaska in August, 2008. The primary data communications goal of the project is to design and implement a robust data communications network capable of downloading 15-sec daily GPS files and streaming 1 Hz GPS data, via Ustream, from Unimak Island to three data relay points in the Aleutian chain. As part of the permitting agreement with the landowner, PBO will co-locate the GPS stations with existing USGS seismic stations. The technical challenges involved in optimizing the data communications network for both the GPS data and the seismic data will be presented. From Unimak island, there will be three separate data telemetry paths: 1) West through a radio repeater on Akutan volcano to a VSAT in Akutan village, 2) East through a radio repeater to a T1 connection in Cold Bay, AK, 3) South through a radio repeater to a VSAT at an existing PBO GPS station in King Cove, AK. The difficulties involved in the project include complex network geometries with multiple radio repeaters, long distance RF transmission over water, hardware bandwidth limitations, power limitations, space limitations, as well as working in bear country on an incredibly remote and active volcano.

  11. Okul Öncesi Eğitimde High Scope Modeli

    OpenAIRE

    Kotaman, Hüseyin

    2009-01-01

    Purpose of this study is to examine High Scope early childhood education system which was developed in USA. Accordingly historical reasons underlied the development of High Scope, systems’ educational theory, its’ curriculum and daily program routine, teachers’ characteristics and their responsibilities and High Scope’s evaluation system are defined. High Scope system base on Piaget’s constructivist theory. In this liberal educational system child learn through invent and const...

  12. Atomic Data and Modelling for Fusion: the ADAS Project

    International Nuclear Information System (INIS)

    Summers, H. P.; O'Mullane, M. G.

    2011-01-01

    The paper is an update on the Atomic Data and Analysis Structure, ADAS, since ICAM-DATA06 and a forward look to its evolution in the next five years. ADAS is an international project supporting principally magnetic confinement fusion research. It has participant laboratories throughout the world, including ITER and all its partner countries. In parallel with ADAS, the ADAS-EU Project provides enhanced support for fusion research at Associated Laboratories and Universities in Europe and ITER. OPEN-ADAS, sponsored jointly by the ADAS Project and IAEA, is the mechanism for open access to principal ADAS atomic data classes and facilitating software for their use. EXTENDED-ADAS comprises a variety of special, integrated application software, beyond the purely atomic bounds of ADAS, tuned closely to specific diagnostic analyses and plasma models.The current scientific content and scope of these various ADAS and ADAS related activities are briefly reviewed. These span a number of themes including heavy element spectroscopy and models, charge exchange spectroscopy, beam emission spectroscopy and special features which provide a broad baseline of atomic modelling and support. Emphasis will be placed on 'lifting the fundamental data baseline'--a principal ADAS task for the next few years. This will include discussion of ADAS and ADAS-EU coordinated and shared activities and some of the methods being exploited.

  13. Strategy and issues for the LHC upgrades and fair, including longer-term prospects

    CERN Document Server

    Zimmermann, F

    2013-01-01

    This report discusses the time line, goals and key ingredients for the next ten years of LHC operation, including injector upgrade, for the following High Luminosity LHC (HL-LHC), and for the FAIR project. Results from pertinent EuCARD-WP4 workshops on optics, space charge, crab cavities, crystal collimation, and electron cloud are summarized in this context. A Large Hadron electron Collider, LHeC, would be an additional upgrade, further expanding the physics scope of the LHC, to eventually include both ep and γγ Higgs factories (LHeC-HF and SAPPHiRE). Results from relevant topical WP4 workshops are highlighted. The development of magnet and cable technology based on Nb$_{3}$Sn, and HTS, for the HL-LHC prepares the ground for a future higher-energy hadron collider, either in the LHC tunnel, “HELHC” (33 TeV c.m.), or in a new 80- or 100-km tunnel, “VHE-LHC” (100 TeV c.m.). A large new tunnel could also host an ultimate highest-precision e+e- Higgs factory collider, “TLEP,” exhibiting many synergi...

  14. Educating the Public Health Workforce: A Scoping Review

    Directory of Open Access Journals (Sweden)

    Donghua Tao

    2018-02-01

    Full Text Available The aim of this scoping review was to identify and characterize the recent literature pertaining to the education of the public health workforce worldwide. The importance of preparing a public health workforce with sufficient capacity and appropriate capabilities has been recognized by major organizations around the world (1. Champions for public health note that a suitably educated workforce is essential to the delivery of public health services, including emergency response to biological, manmade, and natural disasters, within countries and across the globe. No single repository offers a comprehensive compilation of who is teaching public health, to whom, and for what end. Moreover, no international consensus prevails on what higher education should entail or what pedagogy is optimal for providing the necessary education. Although health agencies, public or private, might project workforce needs, the higher level of education remains the sole responsibility of higher education institutions. The long-term goal of this study is to describe approaches to the education of the public health workforce around the world by identifying the peer-reviewed literature, published primarily by academicians involved in educating those who will perform public health functions. This paper reports on the first phase of the study: identifying and categorizing papers published in peer-reviewed literature between 2000 and 2015.

  15. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    Energy Technology Data Exchange (ETDEWEB)

    BAZINET, G.D.

    2001-05-15

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Verification activities for the installed and operational SSCs have been completed. Verification of future additions to the CSB related to the canister cover cap and welding fixture system and MCO Internal Gas Sampling equipment will be completed as appropriate for those components. The open items related to verification of those requirements are noted in section 3

  16. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    Energy Technology Data Exchange (ETDEWEB)

    BAZINET, G.D.

    2000-11-03

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. The purpose of this revision is to document completion of verification actions that were pending at the time the initial report was prepared. Verification activities for the installed and operational SSCs have been completed. Verification of future additions to the CSB related to the canister cover cap and welding fixture system and MCO Internal Gas Sampling equipment will be completed as appropriate for those components. The open items related to verification of those

  17. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    International Nuclear Information System (INIS)

    BAZINET, G.D.

    2001-01-01

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Verification activities for the installed and operational SSCs have been completed. Verification of future additions to the CSB related to the canister cover cap and welding fixture system and MCO Internal Gas Sampling equipment will be completed as appropriate for those components. The open items related to verification of those requirements are noted in section 3.1.5 and will be

  18. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    International Nuclear Information System (INIS)

    BAZINET, G.D.

    2000-01-01

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. The purpose of this revision is to document completion of verification actions that were pending at the time the initial report was prepared. Verification activities for the installed and operational SSCs have been completed. Verification of future additions to the CSB related to the canister cover cap and welding fixture system and MCO Internal Gas Sampling equipment will be completed as appropriate for those components. The open items related to verification of those requirements are noted

  19. Cross-linguistic scope ambiguity: When two systems meet

    Directory of Open Access Journals (Sweden)

    Gregory Scontras

    2017-04-01

    Full Text Available Accurately recognizing and resolving ambiguity is a hallmark of linguistic ability. English is a language with scope ambiguities in doubly-quantified sentences like 'A shark ate every pirate'; this sentence can either describe a scenario with a single shark eating all of the pirates, or a scenario with many sharks—a potentially-different one eating each pirate. In Mandarin Chinese, the corresponding sentence is unambiguous, as it can only describe the single-shark scenario. We present experimental evidence to this effect, comparing native speakers of English with native speakers of Mandarin in their interpretations of doubly-quantified sentences. Having demonstrated the difference between these two languages in their ability for inverse scope interpretations, we then probe the robustness of the grammar of scope by extending our experiments to English-dominant adult heritage speakers of Mandarin. Like native speakers of Mandarin, heritage Mandarin speakers lack inverse scope in Mandarin. Crucially, these speakers also lack inverse scope in English, their dominant language in adulthood. We interpret these results as evidence for the pressure to simplify the grammar of scope, decreasing ambiguity when possible. In other words, when two systems meet—as in the case of heritage speakers—the simpler system prevails. This article is part of the special collection: Quantifier Scope

  20. Proposed IMS infrastructure improvement project, Seward, Alaska. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Environmental Impact Statement (EIS) examines a proposal for improvements at the existing University of Alaska, Fairbanks, Institute of Marine Science (IMS), Seward Marine Center. The Exxon Valdez Oil Spill (EVOS) Trustee Council is proposing to improve the existing research infrastructure to enhance the EVOS Trustee Council`s capabilities to study and rehabilitate marine mammals, marine birds, and the ecosystem injured by the Exxon Valdez oil spill. The analysis in this document focuses on the effects associated with construction and operation of the proposed project and its proposed alternatives. The EIS gives a detailed description of all major elements of the proposed project and its alternatives; identifies resources of major concern that were raised during the scoping process; describes the environmental background conditions of those resources; defines and analyzes the potential effects of the proposed project and its alternatives on these conditions; and identifies mitigating measures that are part of the project design as well as those proposed to minimize or reduce the adverse effects. Included in the EIS are written and oral comments received during the public comment period.

  1. Proposed IMS infrastructure improvement project, Seward, Alaska. Final environmental impact statement

    International Nuclear Information System (INIS)

    1994-09-01

    This Environmental Impact Statement (EIS) examines a proposal for improvements at the existing University of Alaska, Fairbanks, Institute of Marine Science (IMS), Seward Marine Center. The Exxon Valdez Oil Spill (EVOS) Trustee Council is proposing to improve the existing research infrastructure to enhance the EVOS Trustee Council's capabilities to study and rehabilitate marine mammals, marine birds, and the ecosystem injured by the Exxon Valdez oil spill. The analysis in this document focuses on the effects associated with construction and operation of the proposed project and its proposed alternatives. The EIS gives a detailed description of all major elements of the proposed project and its alternatives; identifies resources of major concern that were raised during the scoping process; describes the environmental background conditions of those resources; defines and analyzes the potential effects of the proposed project and its alternatives on these conditions; and identifies mitigating measures that are part of the project design as well as those proposed to minimize or reduce the adverse effects. Included in the EIS are written and oral comments received during the public comment period

  2. Social studying and learning among medical students: a scoping review.

    Science.gov (United States)

    Keren, Daniela; Lockyer, Jocelyn; Ellaway, Rachel H

    2017-10-01

    Medical students study in social groups, which influence their learning, but few studies have investigated the characteristics of study groups and the impacts they have on students' learning. A scoping review was conducted on the topic of informal social studying and learning within medical education with the aim of appraising what is known regarding medical student attitudes to group study, the impact of group study on participants, and the methods that have been employed to study this. Using Arksey and O'Malley's scoping review principles, MEDLINE, EMBASE and CINAHL were searched, along with hand-searching and a targeted search of the grey literature; 18 peer reviewed and 17 grey literature records were included. Thematic conceptual analysis identified a number of themes, including: the nature of group study; the utility and value of group studying including social learning facilitating student engagement, social learning as a source of motivation and accountability, and social learning as a source of wellbeing; and student preferences related to group studying, including its homophilic nature, transgressiveness, and effectiveness. Despite these emerging factors, the evidence base for this phenomenon is small. The findings in this scoping review demonstrate a clear role for social interaction outside of the classroom, and encourage us to consider the factors in student networking, and the implications of this on medical students' academics. We also highlight areas in need of future research to allow us to better situate informal social learning within medical education and to enable educators to support this phenomenon.

  3. Advanced and extended scope practice of radiographers: The Scottish perspective

    International Nuclear Information System (INIS)

    Henderson, I.; Mathers, S.A.; McConnell, J.; Minnoch, D.

    2016-01-01

    Purpose: The impact of changing roles, skill mix and a shortage of consultant radiologists on the profession of diagnostic radiography is not clearly understood in Scotland although the anecdotal perspective suggests the situation in many areas does not equate to that of England. Method: A questionnaire survey was administered to ‘lead diagnostic radiographers’ across all Health Boards in Scotland and this was supplemented with telephone interviews. Results: The implementation of skill mix initiatives and particularly advanced/extended scope practice was found to be geographically variable with limited evidence of change in some areas. Lack of effective funding and backfill for training was found to be a major barrier to change, although it was also acknowledged that opposition from some professional groups could be a major factor. Conclusion: Although there is some optimism and evidence of accelerating change, development of the radiographic workforce in Scotland does not in general compare favourably to the findings of Price et al., in 2007. The reasons are multi-factorial including fiscal, professional and geographical elements. - Highlights: • Implementation of extended scope practice is geographically inconsistent. • AfC banding of radiographers in extended scope roles is inconsistent. • Funding and backfill for training is a recognised difficulty for many managers. • Professional opposition, primarily from radiologists is a barrier to implementation. • Extended scope roles make a notable contribution to enhanced outcomes.

  4. A reanalysis of a behavioral intervention to prevent incident HIV infections: Including indirect effects in modeling outcomes of Project EXPLORE

    Science.gov (United States)

    Eaton, Lisa A.; Kalichman, Seth C.; Kenny, David A.; Harel, Ofer

    2013-01-01

    Background Project EXPLORE -- a large-scale, behavioral intervention tested among men who have sex with men (MSM) at-risk for HIV infection --was generally deemed as ineffective in reducing HIV incidence. Using novel and more precise data analytic techniques we reanalyzed Project EXPLORE by including both direct and indirect paths of intervention effects. Methods Data from 4,296 HIV negative MSM who participated in Project EXPLORE, which included ten sessions of behavioral risk reduction counseling completed from 1999-2005, were included in the analysis. We reanalyzed the data to include parameters that estimate the overtime effects of the intervention on unprotected anal sex and the over-time effects of the intervention on HIV status mediated by unprotected anal sex simultaneously in a single model. Results We found the indirect effect of intervention on HIV infection through unprotected anal sex to be statistically significant up through 12 months post-intervention, OR=.83, 95% CI=.72-.95. Furthermore, the intervention significantly reduced unprotected anal sex up through 18 months post-intervention, OR=.79, 95% CI=.63-.99. Discussion Our results reveal effects not tested in the original model that offer new insight into the effectiveness of a behavioral intervention for reducing HIV incidence. Project EXPLORE demonstrated that when tested against an evidence-based, effective control condition can result in reductions in rates of HIV acquisition at one year follow-up. Findings highlight the critical role of addressing behavioral risk reduction counseling in HIV prevention. PMID:23245226

  5. 76 FR 9346 - Sun City Project LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request...

    Science.gov (United States)

    2011-02-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER11-2857-000] Sun City Project LLC; Supplemental Notice That Initial Market- Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Sun City...

  6. Scoping reviews: time for clarity in definition, methods, and reporting.

    Science.gov (United States)

    Colquhoun, Heather L; Levac, Danielle; O'Brien, Kelly K; Straus, Sharon; Tricco, Andrea C; Perrier, Laure; Kastner, Monika; Moher, David

    2014-12-01

    The scoping review has become increasingly popular as a form of knowledge synthesis. However, a lack of consensus on scoping review terminology, definition, methodology, and reporting limits the potential of this form of synthesis. In this article, we propose recommendations to further advance the field of scoping review methodology. We summarize current understanding of scoping review publication rates, terms, definitions, and methods. We propose three recommendations for clarity in term, definition and methodology. We recommend adopting the terms "scoping review" or "scoping study" and the use of a proposed definition. Until such time as further guidance is developed, we recommend the use of the methodological steps outlined in the Arksey and O'Malley framework and further enhanced by Levac et al. The development of reporting guidance for the conduct and reporting of scoping reviews is underway. Consistency in the proposed domains and methodologies of scoping reviews, along with the development of reporting guidance, will facilitate methodological advancement, reduce confusion, facilitate collaboration and improve knowledge translation of scoping review findings. Copyright © 2014 Elsevier Inc. All rights reserved.

  7. Justice seems not to be for all: Exploring the scope of justice

    OpenAIRE

    Lima-Nunes, Aline; Pereira, Cícero Roberto; Correia, Isabel

    2013-01-01

    The idea that “justice is for everyone” seems to be over. A justice perception can have unfair consequences for those who are perceived not to be included within the boundaries of fairness. This is what the scope of justice is all about: who is within and who is outside of the “justice boundaries”. This paper intends to clarify the concept and explain how social psychologists work with it in real-life contexts. We argue that the scope of justice is a key concept that helps us to understand a ...

  8. Virtual Mockup test based on computational science and engineering. Near future technology projected by JSPS-RFTFADVENTURE project

    International Nuclear Information System (INIS)

    Yoshimura, Shinobu

    2001-01-01

    The ADVENTURE project began on August, 1997, as a project in the computational science' field of JSPS-RFTFADVENTURE project, and is progressed as five year project. In this project, by using versatile parallel computer environment such as PC cluster, super parallel computer, and so on , to solve an arbitrary shape of actual dynamical equation by using 10 to 100 million freedom class mode under maintaining a general use analytical capacity agreeable with present general use computational mechanics system, further development of a large-scale parallel computational mechanics system (ADVENTURE system) capable of carrying out an optimization design on shapes, physical properties, loading conditions, and so on is performed. Here was scoped, after outlining on background of R and D on ADVENTURE system and its features, on near future virtual mockup test forecast from it. (G.K.)

  9. 41 CFR 128-1.8000 - Scope.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Scope. 128-1.8000 Section 128-1.8000 Public Contracts and Property Management Federal Property Management Regulations System (Continued) DEPARTMENT OF JUSTICE 1-INTRODUCTION 1.80-Seismic Safety Program § 128-1.8000 Scope. This subpart...

  10. Overview of a formal scoping review on health system report cards

    Directory of Open Access Journals (Sweden)

    Lewis Steven

    2010-01-01

    Full Text Available Abstract Background There is an extensive body of literature on health system quality reporting that has yet to be characterized. Scoping is a novel methodology for systematically assessing the breadth of a body of literature in a particular research area. Our objectives were to showcase the scoping review methodology in the review of health system quality reporting, and to report on the extent of the literature in this area. Methods A scoping review was performed based on the York methodology outlined by Arksey and O'Malley from the University of York, United Kingdom. We searched 14 peer reviewed and grey literature databases limiting the search to English language and non-English language articles with English abstracts published between 1980 and June 2006 with an update to November 2008. We also searched specific websites, reference lists, and key journals for relevant material and solicited input from key stakeholders. Inclusion/exclusion criteria were applied to select relevant material and qualitative information was charted from the selected literature. Results A total of 10,102 articles were identified from searching the literature databases, 821 were deemed relevant to our scoping review. An additional 401 were identified from updates, website searching, references lists, key journals, and stakeholder suggestions for a total of 1,222 included articles. These were categorized and catalogued according to the inclusion criteria, and further subcategories were identified through the charting process. Topic areas represented by this review included the effectiveness of health system report cards (n = 194 articles, methodological issues in their development (n = 815 articles, stakeholder views on report cards (n = 144 articles, and ethical considerations around their development (n = 69 articles. Conclusions The scoping review methodology has permitted us to characterize and catalogue the extensive body of literature pertaining to health

  11. Project Execution Plan, Rev. 3

    International Nuclear Information System (INIS)

    IT Corporation, Las Vegas

    2002-01-01

    This plan addresses project activities encompassed by the U.S. Department of Energy's (DOE's), National Nuclear Security Administration Nevada Operations Office, Environmental Restoration Division and conforms to the requirements contained in the Life-Cycle Asset Management, DOE Order 430.1A; The Joint Program Office Policy on Project Management in Support of DOE Order 430.1; Program and Project Management for the Acquisition of Capital Assets, DOE Order 413.3; the Project Execution and Engineering Management Planning Guide, GPG-FM-010; and other applicable Good Practice Guides; and the FY 2001 Integrated Planning, Accountability, and Budgeting System Policy Guidance. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense; and traditional project management philosophies such as the development of life-cycle costs, schedules, and work scope; identification o f roles and responsibilities; and baseline management and controls

  12. Project Management Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1995-04-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S ampersand M) and as quickly and economically as possible. Implementation and completion of the deactivation project will further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S ampersand M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities, that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project

  13. Final Status Survey for the Largest Decommissioning Project on Earth

    International Nuclear Information System (INIS)

    Dubiel, R.W.; Miller, J.; Quayle, D.

    2006-01-01

    To assist the United States Department of Energy's (US DOE's) re-industrialization efforts at its gaseous diffusion site in Oak Ridge, Tennessee, known as the East Tennessee Technology Park (ETTP), the US DOE awarded a 6-year Decontamination and Decommissioning (D and D) contract to BNG America (formerly BNFL Inc.) in 1997. The ETTP 3-Building D and D Project included the removal and disposition of the materials and equipment from the K-33, K-31, and K-29 Gaseous Diffusion Plant buildings. The three buildings comprise more than 4.8 million square feet (446,000 square meters) of floor surface area and more than 350 million pounds (148 million kilograms) of hazardous and radioactively contaminated material, making it the largest nuclear D and D project in progress anywhere in the world. The logistical hurdles involved in a project of this scope and magnitude required an extensive amount of Engineering and Health Physics professionals. In order to accomplish the Final Status Survey (FSS) for a project of this scope, the speed and efficiency of automated survey equipment was essential. Surveys of floors, structural steel and ceilings up to 60 feet (18 meters) were required. The FSS had to be expanded to include additional remediation and surveys due to characterization surveys and assumptions regarding the nature and extent of contamination provided by the US DOE. Survey design and technical bases had to consider highly variable constituents; including uranium from depleted to low enrichment, variable levels of Technetium-99 and transuranic nuclides, which were introduced into the cascade during the 1960's when recycled uranium (RU) from Savannah River was re-enriched at the facility. The RU was transported to unexpected locations from leaks in the cascade by complex building ventilation patterns. The primary survey tool used for the post remediation and FSS was the Surface Contamination Monitor (SCM) and the associated Survey Information Management System (SIMS

  14. A project-based system for including farmers in the EU ETS.

    Science.gov (United States)

    Brandt, Urs Steiner; Svendsen, Gert Tinggaard

    2011-04-01

    Farmers in the EU do not trade greenhouse gases under the Kyoto agreement. This is an empirical puzzle because agriculture is a significant contributor of greenhouse gases (GHG) in the EU and may harvest private net gains from trade. Furthermore, the US has strongly advocated land-use practices as 'the missing link' in past climate negotiations. We argue that farmers have relatively low marginal reduction costs and that consequences in terms of the effect on permit price and technology are overall positive in the EU Emission Trading System (ETS). Thus, we propose a project-based system for including the farming practices in the EU ETS that reduces the uncertainty from measuring emission reduction in this sector. The system encourages GHG reduction either by introducing a new and less polluting practice or by reducing the polluting activity. When doing so, farmers will receive GHG permits corresponding to the amount of reduction which can be stored for later use or sold in the EU ETS. Copyright © 2010 Elsevier Ltd. All rights reserved.

  15. ScienceScope: Aerospace

    CSIR Research Space (South Africa)

    CSIR

    2006-12-01

    Full Text Available In this edition of ScienceScope, innovations in and around aerodynamics research and development is explored. The publication explores activities in environmentally friendly aerospace technologies to enhance the aviation industry....

  16. Development of the UMTRA Project Groundwater Environmental Impact Statement

    International Nuclear Information System (INIS)

    Burt, C.; Ulland, L.; Metzler, D.

    1993-01-01

    This paper discusses the development and preparation of the Programmatic Environmental Impact Statement (PEIS) for the Uranium Mill Tailings Remedial Action (UMTRA) Groundwater Restoration Project. The initiation of the scoping process and preparation of the PEIS began when the Notice of Intent (NOI) to prepare the PEIS was published in the Federal Register on November 18, 1992. However, planning for the PEIS began well before the publication of the NOI, with various aspects of the PEIS, such as the initial formulation of the alternatives and the format of the scoping process, being developed early on. During this preliminary planning phase, it became clear that the preparation of this PEIS posed some significant challenges while at the same time provided for significant opportunities. This paper will briefly summarize the UMTRA Project, discuss the major sections in the PEIS, and describe the challenges and opportunities that developed during the preparation of the PEIS

  17. Radiological and environmental consequences. Final report of the Nordic Nuclear Safety Research project BOK-2

    International Nuclear Information System (INIS)

    Palsson, S.E.

    2002-11-01

    Final report of the Nordic Nuclear Safety Research project BOK-2, Radiological and Environmental Consequences. The project was carried out 1998-2001 with participants from all the Nordic countries. Representatives from the Baltic States were also invited to some of the meetings and seminars. The project consisted of work on terrestrial and marine radioecology and had a broad scope in order to enable participation of research groups with various fields of interest. This report focuses on the project itself and gives a general summary of the studies undertaken. A separate technical report summarises the work done by each research group and gives references to papers published in scientific journals. The topics in BOK-2 included improving assessment of old and recent fallout, use of radionuclides as tracers in Nordic marine areas, improving assessment of internal doses and use of mass spectrometry in radioecology. (au)

  18. Status report on the Experimental Boiling Water Reactor (EBWR) Decontamination and Decommissioning (D ampersand D) Project

    International Nuclear Information System (INIS)

    Sears, L.; Garlock, G.; Mencarelli, R.; Fellhauer, C.

    1994-01-01

    ALARON Corporation is under contract, to Argonne National Laboratory - East (ANL-E), to complete the decontamination and decommissioning of the Experimental Boiling Water Reactor (EBWR). The project, begun, in 1986 by ANL-E personnel, is projected to be completed by the end of 1994. The final phase of work was awarded to ALARON in December 1993 with the scope of work including the disassembly and removal of all remaining reactor internals, the reactor vessel, the lead bio-shield, the core liner, and the activated portion of the concrete bio-shield. This paper discusses the work undertaken beginning in January 1994 and continuing through July 1994. During this period the required pre-mobilization documentation was prepared and approved, mobilization was completed, and the reactor internals, reactor vessel, lead bio-shield and core liner were removed. The paper will compare the planned schedule to the actual schedule, discuss problems encountered, review volume reduction techniques and health and safety issues including radiological aspects of the project

  19. Three alternatives to a full scope control room simulator for nuclear power plants

    International Nuclear Information System (INIS)

    Roman, C.P.

    1988-01-01

    Many utilities are purchasing full scope control room simulators for training purposes. But, depending upon training requirements and finances, an alternative to a full scope control room simulator may be a viable option. Westinghouse has recently built and delivered two styles of alternative simulators. This paper discusses the design and operation of both of these simulators, including advantages and limitations of each design. In addition, the design of a hybrid system which combines features from both of these designs is presented

  20. The screening and scoping of Environmental Impact Assessment and Strategic Environmental Assessment of Carbon Capture and Storage in the Netherlands

    International Nuclear Information System (INIS)

    Koornneef, Joris; Faaij, Andre; Turkenburg, Wim

    2008-01-01

    The Environmental Impact Assessment (EIA) and Strategic Environmental Assessment (SEA) are procedural tools which have as goal to assess and evaluate possible environmental effects of, respectively, a proposed project or policy plan. The goal of this article is to explore possible bottlenecks in applying both the EIA and SEA procedures on Carbon Capture and Storage (CCS) activities in the Netherlands, as experience is currently minimal or lacking. In this study we focus mainly on the institutional and procedural aspects of the screening and scoping phases of both procedures. This is achieved by reviewing EIA and SEA procedures for analogue projects for the three distinctive process steps of a CCS project, namely the power plant with capture, the transport and finally the underground storage of the CO 2 . Additionally, EIA and SEA or similar procedures on CCS in other countries are reviewed and the legal framework for the Dutch EIA and SEA is studied. This article shows a concise overview of the EIA and SEA procedure in the Netherlands and the relation between both procedures. Based on our findings we have constructed a conceptual taxonomy for the scope of both procedures for CCS in the Netherlands. This taxonomy conceptualizes the possible integration of assessing the environmental impacts for tiered levels of decision making. This integration might be needed for first CCS projects as decisions on the strategic (spatial planning) level are currently absent for CCS in the Netherlands. Perpendicular to such integration is the integration of linked activities in the CCS chain and their alternatives, into one procedure. We argue that it would be beneficial to combine the separate EIA procedures for CCS activities into one procedure or at least provide close linkage between them. This issue should be carefully considered by regulators, competent authorities and project initiators in an early stage to avoid delaying legal procedures in the future. For the same reason

  1. The Management of Projects and Product Experimentation

    DEFF Research Database (Denmark)

    Lorenzen, Mark; Frederiksen, Lars

    2005-01-01

    The paper analyses management of product innovation in project-based industries, offering a view on management not only of firms, but also of markets. It first argues that projects are prominent in industries where the nature of consumer demand means that product innovation takes place...... as experimentation. Then, the paper argues that if skills needed for projects are very diverse and projects are complex, there are few internal managerial economies of projects, and the scope for management then transcends the boundaries of firms. In these cases, markets become organized in combinations of people......, contracts, and other institutions, in order to facilitate the coordination of market-based projects. While contracts play a role, a continuous, active role of knowledgeable managers (leaders and boundary spanners) is also often necessary. Such managers --- and thus (core parts of) whole industries...

  2. Suicide among Older People: Projections for the Future.

    Science.gov (United States)

    Haas, Ann Pollinger; Hendin, Herbert

    1983-01-01

    Demonstrates the relationship between cohort size and longitudinal suicide rates, with reference to four particular cohorts. Combines this perspective with projected population increases among older age groups to estimate the scope of the problem of suicide among older people during the early decades of the next century. (Author/JAC)

  3. Scope of practice review: providers for triage and assessment of spine-related disorders

    Directory of Open Access Journals (Sweden)

    Boakye O

    2016-05-01

    Full Text Available Omenaa Boakye,1 Arden Birney,1 Esther Suter,1 Leah Adeline Phillips,2 Victoria YM Suen3 1Workforce Research and Evaluation, Alberta Health Services, Calgary, 2College of Licensed Practical Nurses of Alberta, Edmonton, 3Addiction and Mental Health SCN, Alberta Health Services, Edmonton, AB, Canada Purpose: This study explored which health care providers could be involved in centralized intake for patients with nonspecific low back pain to enhance access, continuity, and appropriateness of care. Methods: We reviewed the scope of practice regulations for a range of health care providers. We also conducted telephone interviews with 17 individuals representing ten provincial colleges and regulatory bodies to further understand providers' legislated scopes of practice. Activities relevant to triaging and assessing patients with low back pain were mapped against professionals' scope of practice. Results: Family physicians and nurse practitioners have the most comprehensive scopes and can complete all restricted activities for spine assessment and triage, while the scope of registered nurses and licensed practical nurses are progressively narrower. Chiropractors, occupational therapists, physiotherapists, and athletic therapists are considered experts in musculoskeletal assessments and appear best suited for musculoskeletal specific assessment and triage. Other providers may play a complementary role depending on the individual patient needs. Conclusion: These findings indicate that an interprofessional assessment and triage team that includes allied health professionals would be a feasible option to create a centralized intake model. Implementation of such teams would require removing barriers that currently prevent providers from delivering on their full scope of practice. Keywords: scope of practice review, low back pain, integrated service model, centralized intake, interprofessional team

  4. What Have Researchers Learned from Project STAR?

    Science.gov (United States)

    Schanzenbach, Diane Whitmore

    2007-01-01

    Project STAR (Student/Teacher Achievement Ratio) was a large-scale randomized trial of reduced class sizes in kindergarten through the third grade. Because of the scope of the experiment, it has been used in many policy discussions. For example, the California statewide class-size-reduction policy was justified, in part, by the successes of…

  5. The Impact of Consumer Knowledge Bias on Narrow-Scope Trust, Broad-Scope Trust, and Relationship Satisfaction

    DEFF Research Database (Denmark)

    Hansen, Torben; Grønholdt, Lars; Josiassen, Alexander

    2016-01-01

    This study investigates how consumer knowledge bias - defined as knowledge over/underconfidence (O/U) - influences two types of trust (broad-scope trust and narrow-scope trust) and consumer relationship satisfaction. Based on a survey comprising 756 mutual fund investors, the contribution...... of this study to the marketing literature is twofold. First, taking a marketing relationship approach this study suggests and demonstrates that knowledge O/U positively influences relationship satisfaction and narrow-scope trust such that the more knowledge O/U a customer becomes, the higher/lower the level...... is low compared to high. Notably, the study findings strongly suggest that marketing managers should carry out their relationship satisfaction and trust improvement efforts relative to the combination of customers‟ subjective and objective knowledge....

  6. Work Breakdown Structures The Foundation for Project Management Excellence

    CERN Document Server

    Norman, Eric S; Fried, Robert T

    2011-01-01

    Understand and apply new concepts regarding Work Breakdown Structures The Work Breakdown Structure (WBS) has emerged as a foundational concept and tool in Project Management. It is an enabler that ensures clear definition and communication of project scope while performing a critical role as a monitoring and controlling tool. Created by the three experts who led the development of PMI's Practice Standard for Work Breakdown Structures, Second Edition, this much-needed text expands on what the standard covers and describes how to go about successfully implementing the WBS within the project life

  7. Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems.

  8. Thermomechanical scoping calculations for the waste package environment tests

    International Nuclear Information System (INIS)

    Butkovich, T.R.; Yow, J.L. Jr.

    1986-03-01

    During the site characterization phase of the Nevada Nuclear Waste Storage Investigation Project, tests are planned to provide field information on the hydrological and thermomechanical environment. These results are needed for assessing performance of stored waste packages emplaced at depth in excavations in a rock mass. Scoping calculations were performed to provide information on displacements and stress levels attained around excavations in the rock mass from imposing a thermal load designed to simulate the heat produced by radioactive decay. In this way, approximate levels of stresses and displacements are available for choosing instrumentation type and sensitivity as well as providing indications for optimizing instrument emplacement during the test. 7 refs., 9 figs., 1 tab

  9. Interactive Iconography: Using Visual Scope to Promote Writing and Revision

    Science.gov (United States)

    Lansiquot, Reneta

    2010-01-01

    A three-month study examined how interactive iconography impacts social studies and promotes critical writing skills. Groups of three middle-school immigrant students constructed museum labels using "Scope Out", an experimental online revision tool that makes iconography interactive. This study included three comparison groups and one…

  10. Energy secretary's priorities include San Francisco area research projects

    CERN Multimedia

    Widener, A

    2003-01-01

    "Bay Area research labs got a big boost Monday when the Secretary of Energy unveiled his priorities for major research projects his agency hopes to fund over the next two decades. Among the agency's 28 top priorities are a major computer expansion and an experiment examining the expanding universe that could be housed at Lawrence Berkeley Lab and a powerful X-ray laser planned for the Stanford Linear Accelerator Center" (1 page).

  11. Congressional hearing reviews NSF major research and facilities projects

    Science.gov (United States)

    Showstack, Randy

    2012-03-01

    An 8 March congressional hearing about the U.S. National Science Foundation's Major Research Equipment and Facilities Construction (NSF MREFC) account focused on fiscal management and accountability of projects in that account and reviewed concerns raised by NSF's Office of Inspector General (OIG). NSF established the MREFC account in 1995 to better plan and manage investments in major equipment and facilities projects, which can cost from tens of millions to hundreds of millions of dollars, and the foundation has funded 17 MREFC projects since then. The Obama administration's proposed fiscal year (FY) 2013 budget includes funding for four MREFC projects: Advanced Laser Gravitational-Wave Observatory (AdvLIGO), Advanced Technology Solar Telescope (ATST), National Ecological Observatory (NEON), and Ocean Observatories Initiative (OOI). The hearing, held by a subcommittee of the House of Representatives' Committee on Science, Space, and Technology, reviewed management oversight throughout the life cycles of MREFC projects and concerns raised in recent OIG reports about the use of budget contingency funds. NSF's February 2012 manual called "Risk management guide for large facilities" states that cost contingency is "that portion of the project budget required to cover `known unknowns,'" such as planning and estimating errors and omissions, minor labor or material price fluctuations, and design developments and changes within the project scope. Committee members acknowledged measures that NSF has made to improve the MREFC oversight process, but they also urged the agency to continue to take steps to ensure better project management.

  12. Information management needs for Fort Calhoun's design basis reconstitution project

    International Nuclear Information System (INIS)

    Beach, D.R.; Erickson, E.A.; Gambhir, S.K.; Parsons, R.D.

    1989-01-01

    While the need for information management is not new to the nuclear industry or Omaha Public Power District (OPPD), the interrelationship among design information, multiple systems, and design basis issues has necessitated the management of this information in new ways. The project team involved in the reconstitution of the design basis for OPPD's Fort Calhoun nuclear station has experienced the need for the developed effective methods for managing the vast amount of interrelated information associated with this effort. This management of information has been necessary to ensure that design basis documents (DBDs) adequately reflect the interrelated nature of component, system, and plant design; are complete and accurate; and are produced and maintained in a cost-effective manner. Fort Calhoun's aggressive design basis reconstitution project began in early 1987. The present scope of the project includes the production of 52 system and plant level DBDs; currently the project is ∼50% complete with DBDs in various stages of completion, from pilot DBDs through DBDs with approved formats, which have been issued for use. The experience in producing these documents has lead to a growing understanding of the special need for information management in each stage of the project. The development of the information tracking and management processes for the various stages of DBD development has proven to be cost-effective and gives a level of assurance that information has been included in the DBDs consistently and accurately

  13. Tailoring engineering activities to D and D projects - 16056

    International Nuclear Information System (INIS)

    Negin, Charles A.; Urland, Charles S.; Szilagyi, Andrew P.; Collazo, Yvette T.; Santos, Joseph K.; Gladden, John B.

    2009-01-01

    Engineering is an important element of Deactivation and Decommissioning (D and D) project technical planning, scheduling, estimating, and execution. Understanding the scope of engineering and related design, deciding when in a project's schedule these activities should be conducted, and specifying the products to be generated from each engineering task are important management functions. These subjects are addressed in a guidance report developed by the U.S. Department of Energy (DOE) described in this paper. (authors)

  14. A study of a decommissioning activities classification structure for decommissioning of the project management of a nuclear power plant

    International Nuclear Information System (INIS)

    Park, Hee Seong; Park, Seung Kook; Jin, Hyung Gon; Song, Chan Ho; Ha, Jei Hyun; Moon, Jei kwon

    2015-01-01

    Decommissioning activities and requirements that was established in the planning stage should be organized systematically in the course of dismantling the NPP. The work breakdown structure is essential to ensuring that all the project scope is identified, estimated and executed. The project manager needs to ensure that a WBS is established early in the project and maintained throughout the project life cycle. A project management system is ongoing under the circumstance of having no experience dismantling the NPP. The system related to the NPP decommissioning should have technical criteria as well as regulatory requirements in the full scale of decommissioning stage. In the dismantling stage, decommissioning plan document should include the results of radiation/radioactivity characterization, evaluation of the amount of dismantled waste, calculation of the expose dose rate, evaluation of decommissioning cost and schedule after shutdown

  15. A study of a decommissioning activities classification structure for decommissioning of the project management of a nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Park, Hee Seong; Park, Seung Kook; Jin, Hyung Gon; Song, Chan Ho; Ha, Jei Hyun; Moon, Jei kwon [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-05-15

    Decommissioning activities and requirements that was established in the planning stage should be organized systematically in the course of dismantling the NPP. The work breakdown structure is essential to ensuring that all the project scope is identified, estimated and executed. The project manager needs to ensure that a WBS is established early in the project and maintained throughout the project life cycle. A project management system is ongoing under the circumstance of having no experience dismantling the NPP. The system related to the NPP decommissioning should have technical criteria as well as regulatory requirements in the full scale of decommissioning stage. In the dismantling stage, decommissioning plan document should include the results of radiation/radioactivity characterization, evaluation of the amount of dismantled waste, calculation of the expose dose rate, evaluation of decommissioning cost and schedule after shutdown.

  16. Buildings of the Future Scoping Study: A Framework for Vision Development

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Na [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Goins, John D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-02-01

    The Buildings of the Future Scoping Study, funded by the U.S. Department of Energy (DOE) Building Technologies Office, seeks to develop a vision for what U.S. mainstream commercial and residential buildings could become in 100 years. This effort is not intended to predict the future or develop a specific building design solution. Rather, it will explore future building attributes and offer possible pathways of future development. Whether we achieve a more sustainable built environment depends not just on technologies themselves, but on how effectively we envision the future and integrate these technologies in a balanced way that generates economic, social, and environmental value. A clear, compelling vision of future buildings will attract the right strategies, inspire innovation, and motivate action. This project will create a cross-disciplinary forum of thought leaders to share their views. The collective views will be integrated into a future building vision and published in September 2015. This report presents a research framework for the vision development effort based on a literature survey and gap analysis. This document has four objectives. First, it defines the project scope. Next, it identifies gaps in the existing visions and goals for buildings and discusses the possible reasons why some visions did not work out as hoped. Third, it proposes a framework to address those gaps in the vision development. Finally, it presents a plan for a series of panel discussions and interviews to explore a vision that mitigates problems with past building paradigms while addressing key areas that will affect buildings going forward.

  17. Alternative techniques for environmental project management

    International Nuclear Information System (INIS)

    Reeves, S.

    1994-01-01

    Beginning in the late 1970s and early 1980s, increased regulation and recognition of ground water as an important natural resource led industry to address subsurface contamination at many sites. This caused the industry's dependence on environmental consultants to increase drastically. Initially, the accepted practice for addressing environmental concerns was to rely upon consultants to determine appropriate work scope, budgets, procedures and regulatory interaction. While significant advances have been made in technology and consulting services, improvement in project management and cost containment have been limited. In order to effectively manage environmental projects, it is imperative that business risks and standardized project management practices be factored into environmental solutions. A standardized environmental project management program was developed and applied to projects at petroleum marketing facilities throughout the United States. Following development and implementation, detailed studies were conducted to measure the value of standardization in reducing costs and enhancing efficiencies. The results indicate significant improvement in both reducing project costs and in enhancing the efficiency of consultants

  18. Pine Gene Discovery Project - Final Report - 08/31/1997 - 02/28/2001; FINAL

    International Nuclear Information System (INIS)

    Whetten, R. W.; Sederoff, R. R.; Kinlaw, C.; Retzel, E.

    2001-01-01

    Integration of pines into the large scope of plant biology research depends on study of pines in parallel with study of annual plants, and on availability of research materials from pine to plant biologists interested in comparing pine with annual plant systems. The objectives of the Pine Gene Discovery Project were to obtain 10,000 partial DNA sequences of genes expressed in loblolly pine, to determine which of those pine genes were similar to known genes from other organisms, and to make the DNA sequences and isolated pine genes available to plant researchers to stimulate integration of pines into the wider scope of plant biology research. Those objectives have been completed, and the results are available to the public. Requests for pine genes have been received from a number of laboratories that would otherwise not have included pine in their research, indicating that progress is being made toward the goal of integrating pine research into the larger molecular biology research community

  19. Making Patent Scopes Exceed the Technological Scopes of Scientific Inventions

    DEFF Research Database (Denmark)

    Beukel, Karin

    This paper presents the results of a grounded theory study of the transformation of scientific discoveries into patented inventions. Using an algebraic interpretive approach, the narratives collected during interviews are analyzed as Bayesian inferences and the developed theory is tested. The fin...... for searching in new directions for solutions if challenges of exploitation with regard to the scientific invention arise.......This paper presents the results of a grounded theory study of the transformation of scientific discoveries into patented inventions. Using an algebraic interpretive approach, the narratives collected during interviews are analyzed as Bayesian inferences and the developed theory is tested....... The findings recast the relationship between science and patents as a process in which the way the transformation of the scientific invention is handled has an effect on the breadth of the patent scope. Unleashing patent scope surplus is dependent on processes related to abstraction and cognitive variety...

  20. Enhancement and creation of secondary channel habitat: Review of project performance across a range of project types and settings

    Science.gov (United States)

    Epstein, J.; Lind, P.

    2017-12-01

    Secondary channels provide critical off-channel habitat for key life stages of aquatic species. In many systems, interruption of natural processes via anthropogenic influences have reduced the quantity of secondary channel habitat and have impaired the processes that help form and maintain them. Creation and enhancement of secondary channels is therefore a key component of stream rehabilitation, particularly in the Pacific Northwest where the focus has been on enhancement of habitat for ESA-listed salmonids. Secondary channel enhancement varies widely in scope, scale, and approach depending on species requirements, hydrology/hydraulics, geomorphologic setting, sediment dynamics, and human constraints. This presentation will review case studies from numerous secondary channel projects constructed over the last 20 years by different entities and in different settings. Lessons learned will be discussed that help to understand project performance and inform future project design. A variety of secondary channel project types will be reviewed, including mainstem flow splits, year-round flow through, seasonally activated, backwater alcove, natural groundwater-fed, and engineered groundwater-fed (i.e. groundwater collection galleries). Projects will be discussed that span a range of project construction intensities, such as full excavation of side channels, select excavation to increase flow, or utilizing mainstem structures to activate channels. Different configurations for connecting to the main channel, and their relative performance, will also be presented. A variety of connection types will be discussed including stabilized channel entrance, free-formed entrance, using bar apex jams to split flows, using `bleeder' jams to limit secondary channel flow, and obstructing the main channel to divert flows into secondary channels. The performance and longevity of projects will be discussed, particularly with respect to the response to sediment mobilizing events. Lessons

  1. Goal and Scope in Life Cycle Sustainability Analysis: The Case of Hydrogen Production from Biomass

    Directory of Open Access Journals (Sweden)

    Milena Stefanova

    2014-08-01

    Full Text Available The framework for life cycle sustainability analysis (LCSA developed within the project CALCAS (Co-ordination Action for innovation in Life-Cycle Analysis for Sustainability is introducing a truly integrated approach for sustainability studies. However, it needs to be further conceptually refined and to be made operational. In particular, one of the gaps still hindering the adoption of integrated analytic tools for sustainability studies is the lack of a clear link between the goal and scope definition and the modeling phase. This paper presents an approach to structure the goal and scope phase of LCSA so as to identify the relevant mechanisms to be further detailed and analyzed in the modeling phase. The approach is illustrated with an on-going study on a new technology for the production of high purity hydrogen from biomass, to be used in automotive fuel cells.

  2. The role of ethics in data governance of large neuro-ICT projects.

    Science.gov (United States)

    Stahl, Bernd Carsten; Rainey, Stephen; Harris, Emma; Fothergill, B Tyr

    2018-05-14

    We describe current practices of ethics-related data governance in large neuro-ICT projects, identify gaps in current practice, and put forward recommendations on how to collaborate ethically in complex regulatory and normative contexts. We undertake a survey of published principles of data governance of large neuro-ICT projects. This grounds an approach to a normative analysis of current data governance approaches. Several ethical issues are well covered in the data governance policies of neuro-ICT projects, notably data protection and attribution of work. Projects use a set of similar policies to ensure users behave appropriately. However, many ethical issues are not covered at all. Implementation and enforcement of policies remain vague. The data governance policies we investigated indicate that the neuro-ICT research community is currently close-knit and that shared assumptions are reflected in infrastructural aspects. This explains why many ethical issues are not explicitly included in data governance policies at present. With neuro-ICT research growing in scale, scope, and international involvement, these shared assumptions should be made explicit and reflected in data governance.

  3. Atucha II NPP full scope simulator modelling with the thermal hydraulic code TRAC{sub R}T

    Energy Technology Data Exchange (ETDEWEB)

    Alonso, Pablo Rey; Ruiz, Jose Antonio; Rivero, Norberto, E-mail: prey@tecnatom.e, E-mail: jaruiz@tecnatom.e, E-mail: nrivero@tecnatom.e [Tecnatom S.A., Madrid (Spain)

    2011-07-01

    In February 2010 NA-SA (Nucleoelectrica Argentina S.A.) awarded Tecnatom the Atucha II full scope simulator project. NA-SA is a public company owner of the Argentinean nuclear power plants. Atucha II is due to enter in operation shortly. Atucha II NPP is a PHWR type plant cooled by the water of the Parana River and has the same design as the Atucha I unit, doubling its power capacity. Atucha II will produce 745 MWe utilizing heavy water as coolant and moderator, and natural uranium as fuel. A plant singular feature is the permanent core refueling. TRAC{sub R}T is the first real time thermal hydraulic six-equations code used in the training simulation industry for NSSS modeling. It is the result from adapting to real time the best estimate code TRACG. TRAC{sub R}T is based on first principle conservation equations for mass, energy and momentum for liquid and steam phases, with two phase flows under non homogeneous and non equilibrium conditions. At present, it has been successfully implemented in twelve full scope replica simulators in different training centers throughout the world. To ease the modeling task, TRAC{sub R}T includes a graphical pre-processing tool designed to optimize this process and alleviate the burden of entering alpha numerical data in an input file. (author)

  4. Project cost estimation techniques used by most emerging building ...

    African Journals Online (AJOL)

    consisted of five distinct types of contractors, general builders, civil engineers, electricians ... Mmboswobeni Watson Ladzani, Department of Business Management, University of South .... final cost of a proposed project for a given work scope. Thus, by .... Since the test statistic does not exceed the critical region, the null.

  5. Financing wind power projects : perspectives from the US market

    International Nuclear Information System (INIS)

    Alam, M.

    2005-01-01

    This presentation outlined the recent assignments, core competencies and scope of services provided by Alyra Renewable Energy Finance Advisors. Renewable energy developers seek Alyra's assistance in developing strategies to achieve the most competitive solutions in finance and strategy. Alyra has broad finance expertise in renewable energy projects, a deep knowledge of markets and a significant wind industry network. Alyra identifies emerging issues, completes financing solutions and helps with contract negotiations. This presentation outlined the notable features of wind financing, wind assessment, offtake arrangements, equity considerations, US wind debt markets, long term bank financing, and combined bank and private placement financing. It also included recent debt market activity for seven large wind farms in the United States. tabs., figs

  6. Development of a large-screen high-definition laser video projection system

    Science.gov (United States)

    Clynick, Tony J.

    1991-08-01

    A prototype laser video projector which uses electronic, optical, and mechanical means to project a television picture is described. With the primary goal of commercial viability, the price/performance ratio of the chosen means is critical. The fundamental requirement has been to achieve high brightness, high definition images of at least movie-theater size, at a cost comparable with other existing large-screen video projection technologies, while having the opportunity of developing and exploiting the unique properties of the laser projected image, such as its infinite depth-of-field. Two argon lasers are used in combination with a dye laser to achieve a range of colors which, despite not being identical to those of a CRT, prove to be subjectively acceptable. Acousto-optic modulation in combination with a rotary polygon scanner, digital video line stores, novel specialized electro-optics, and a galvanometric frame scanner form the basis of the projection technique achieving a 30 MHz video bandwidth, high- definition scan rates (1125/60 and 1250/50), high contrast ratio, and good optical efficiency. Auditorium projection of HDTV pictures wider than 20 meters are possible. Applications including 360 degree(s) projection and 3-D video provide further scope for exploitation of the HD laser video projector.

  7. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    International Nuclear Information System (INIS)

    MCGRATH, G.M.

    2000-01-01

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland, Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-99. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 30 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration

  8. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    Energy Technology Data Exchange (ETDEWEB)

    HOLSTEIN, W.A.

    1999-08-01

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-96. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 50 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.

  9. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    Energy Technology Data Exchange (ETDEWEB)

    MCGRATH, G.M.

    2000-06-21

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland, Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-99. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 30 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.

  10. Delegation in Long-term Care: Scope of practice or job description?

    Science.gov (United States)

    Corazzini, Kirsten N; Anderson, Ruth A; Rapp, Carla Gene; Mueller, Christine; McConnell, Eleanor S; Lekan, Deborah

    2010-05-31

    This study is a qualitative, descriptive study of how registered nurses (RNs) (N=33) in leadership roles in institutionalized long-term care settings delegate care, including their strategies and processes for delegating care, and their perceptions of barriers to effective delegation and potential benefits of delegation. Findings indicate two key approaches to delegation, including the "follow the job description" approach, emphasizing adherence to facility-level roles and job descriptions, and the "consider the scope of practice" approach, emphasizing consideration of multiple aspects of scope of practice and licensure, and the context of care. While the former resulted in more clarity and certainty for the RN, the latter facilitated a focus on quality of resident care outcomes as linked to the delegation process. Barriers to effective delegation were comparable among RNs using either approach to delegation, and almost all RNs could describe benefits of delegation for long-term care.

  11. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  12. Guidelines for the development of a Project Data Management Plan (PDMP)

    Science.gov (United States)

    Green, James L.; King, Joseph H.

    1988-01-01

    The purpose of this document is to assist NASA Project personnel in the preparation of their Project Data Management Plans (PDMP) in accordance with NASA Management Instruction (NMI) 8030.3A. In addition, this report summarizes the scope of a PDMP and establishes important aspects that must be addressed for the long term management and archiving of the data from a NASA space flight investigation.

  13. 26 CFR 1.641(a)-0 - Scope of subchapter J.

    Science.gov (United States)

    2010-04-01

    ... mitigation of (i) the progressive rates of tax (including mitigation as a result of deferral of tax) or (ii...(a)-0 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES Estates, Trusts, and Beneficiaries § 1.641(a)-0 Scope of subchapter J. (a) In...

  14. A Cross-Curricular, Problem-Based Project to Promote Understanding of Poverty in Urban Communities

    Science.gov (United States)

    Gardner, Daniel S.; Tuchman, Ellen; Hawkins, Robert

    2010-01-01

    This article describes the use of problem-based learning to teach students about the scope and consequences of urban poverty through an innovative cross-curricular project. We illustrate the process, goals, and tasks of the Community Assessment Project, which incorporates community-level assessment, collection and analysis of public data, and…

  15. Response to Challenges and Opportunities for Mega-Infrastructure Projects and Archaeology

    Directory of Open Access Journals (Sweden)

    Amanda Sutphin

    2013-10-01

    Full Text Available This is a very helpful and informative essay written by someone who is clearly very experienced with the complexity of urban archaeology. I would like to offer a perspective about these issues from New York City as although there are no projects that are truly analogous in both the scale and scope of the archaeology of the Crossrail Project, we do have similar projects from a construction standpoint (see New York City Department of Environment 2013 and MTA 2013.

  16. Growth and Expansion of the International Criticality Safety Benchmark Evaluation Project and the Newly Organized International Reactor Physics Experiment Evaluation Project

    International Nuclear Information System (INIS)

    J. Blair Briggs; Lori Scott; Yolanda Rugama; Enrico Satori

    2007-01-01

    Since ICNC 2003, the International Criticality Safety Benchmark Evaluation Project (ICSBEP) has continued to expand its efforts and broaden its scope. Criticality-alarm/shielding type benchmarks and fundamental physics measurements that are relevant to criticality safety applications are not only included in the scope of the project, but benchmark data are also included in the latest version of the handbook. A considerable number of improvements have been made to the searchable database, DICE and the criticality-alarm/shielding benchmarks and fundamental physics measurements have been included in the database. There were 12 countries participating on the ICSBEP in 2003. That number has increased to 18 with recent contributions of data and/or resources from Brazil, Czech Republic, Poland, India, Canada, and China. South Africa, Germany, Argentina, and Australia have been invited to participate. Since ICNC 2003, the contents of the ''International Handbook of Evaluated Criticality Safety Benchmark Experiments'' have increased from 350 evaluations (28,000 pages) containing benchmark specifications for 3070 critical or subcritical configurations to 442 evaluations (over 38,000 pages) containing benchmark specifications for 3957 critical or subcritical configurations, 23 criticality-alarm-placement/shielding configurations with multiple dose points for each, and 20 configurations that have been categorized as fundamental physics measurements that are relevant to criticality safety applications in the 2006 Edition of the ICSBEP Handbook. Approximately 30 new evaluations and 250 additional configurations are expected to be added to the 2007 Edition of the Handbook. Since ICNC 2003, a reactor physics counterpart to the ICSBEP, The International Reactor Physics Experiment Evaluation Project (IRPhEP) was initiated. Beginning in 1999, the IRPhEP was conducted as a pilot activity by the by the Organization of Economic Cooperation and Development (OECD) Nuclear Energy Agency

  17. MicroScope: a platform for microbial genome annotation and comparative genomics.

    Science.gov (United States)

    Vallenet, D; Engelen, S; Mornico, D; Cruveiller, S; Fleury, L; Lajus, A; Rouy, Z; Roche, D; Salvignol, G; Scarpelli, C; Médigue, C

    2009-01-01

    The initial outcome of genome sequencing is the creation of long text strings written in a four letter alphabet. The role of in silico sequence analysis is to assist biologists in the act of associating biological knowledge with these sequences, allowing investigators to make inferences and predictions that can be tested experimentally. A wide variety of software is available to the scientific community, and can be used to identify genomic objects, before predicting their biological functions. However, only a limited number of biologically interesting features can be revealed from an isolated sequence. Comparative genomics tools, on the other hand, by bringing together the information contained in numerous genomes simultaneously, allow annotators to make inferences based on the idea that evolution and natural selection are central to the definition of all biological processes. We have developed the MicroScope platform in order to offer a web-based framework for the systematic and efficient revision of microbial genome annotation and comparative analysis (http://www.genoscope.cns.fr/agc/microscope). Starting with the description of the flow chart of the annotation processes implemented in the MicroScope pipeline, and the development of traditional and novel microbial annotation and comparative analysis tools, this article emphasizes the essential role of expert annotation as a complement of automatic annotation. Several examples illustrate the use of implemented tools for the review and curation of annotations of both new and publicly available microbial genomes within MicroScope's rich integrated genome framework. The platform is used as a viewer in order to browse updated annotation information of available microbial genomes (more than 440 organisms to date), and in the context of new annotation projects (117 bacterial genomes). The human expertise gathered in the MicroScope database (about 280,000 independent annotations) contributes to improve the quality of

  18. 10 CFR 600.500 - Purpose and scope.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Purpose and scope. 600.500 Section 600.500 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS FINANCIAL ASSISTANCE RULES Eligibility Determination for Certain Financial Assistance Programs-General Statement of Policy § 600.500 Purpose and scope...

  19. 5 CFR 179.301 - Scope of regulations.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Scope of regulations. 179.301 Section 179.301 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS CLAIMS COLLECTION STANDARDS Administrative Offset § 179.301 Scope of regulations. These regulations apply to the...

  20. Underestimation of Project Costs

    Science.gov (United States)

    Jones, Harry W.

    2015-01-01

    Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

  1. Hardware Support for Safety-critical Java Scope Checks

    DEFF Research Database (Denmark)

    Rios Rivas, Juan Ricardo; Schoeberl, Martin

    2012-01-01

    Memory management in Safety-Critical Java (SCJ) is based on time bounded, non garbage collected scoped memory regions used to store temporary objects. Scoped memory regions may have different life times during the execution of a program and hence, to avoid leaving dangling pointers, it is necessary...... in terms of execution time for applications where cross-scope references are frequent. Our proposal was implemented and tested on the Java Optimized Processor (JOP)....

  2. Summaries of studies carried out in the NKS/BOK-2 project. Technical report[Radiological and environmental consequences

    Energy Technology Data Exchange (ETDEWEB)

    Palsson, S E [Icelandic Radiation Protection Inst., Reykjavik (Iceland)

    2002-12-01

    Summaries of studies carried out in the NKSBOK-2 project, Radiological and Environmental Consequences. The structure of the project as such is described in NKS-64, Radiological and Environmental Consequences - Final Report of the Nordic Nuclear Safety Research Project BOK-2. That report also includes compilations based on the summaries presented in this report. The project was carried out 1998-2001 with participants from all the Nordic countries. Representatives from the Baltic States were also invited to some of the meetings and seminars. The project consisted of work on terrestrial and marine radioecology and had a broad scope in order to enable participation of research groups with various fields of interest. The topics included improving assessment of old and recent fallout, use of radionuclides as tracers in Nordic marine areas, improving assessment of internal doses and use of mass spectrometry in radioecology. This report is a compilation of summaries from each research group, 32 papers in all, and gives references to papers published in scientific journals. Some of the studies have been described previously, at least to some degree, in NKS-70, Proceedings of the 8{sup th} Nordic Seminar on Radioecology, 25-28 February 2001, Rovaniemi, Finland. (au)

  3. 16 CFR 314.1 - Purpose and scope.

    Science.gov (United States)

    2010-01-01

    ... relationship, or pertains to the customers of other financial institutions that have provided such information... SAFEGUARDING CUSTOMER INFORMATION § 314.1 Purpose and scope. (a) Purpose. This part, which implements sections..., confidentiality, and integrity of customer information. (b) Scope. This part applies to the handling of customer...

  4. 29 CFR 4010.1 - Purpose and scope.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Purpose and scope. 4010.1 Section 4010.1 Labor Regulations Relating to Labor (Continued) PENSION BENEFIT GUARANTY CORPORATION CERTAIN REPORTING AND DISCLOSURE REQUIREMENTS ANNUAL FINANCIAL AND ACTUARIAL INFORMATION REPORTING § 4010.1 Purpose and scope. This part...

  5. 28 CFR 32.31 - Scope of subpart.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Scope of subpart. 32.31 Section 32.31 Judicial Administration DEPARTMENT OF JUSTICE PUBLIC SAFETY OFFICERS' DEATH, DISABILITY, AND EDUCATIONAL ASSISTANCE BENEFIT CLAIMS Educational Assistance Benefit Claims § 32.31 Scope of subpart. Consistent with...

  6. Developing Federated Services within Seismology: IRIS' involvement in the CoopEUS Project

    Science.gov (United States)

    Ahern, T. K.; Trabant, C. M.; Stults, M.

    2014-12-01

    As a founding member of the CoopEUS initiative, IRIS Data Services has partnered with five data centers in Europe and the UC Berkeley (NCEDC) in the US to implement internationally standardized web services to access seismological data using identical methodologies. The International Federation of Digital Seismograph Networks (FDSN) holds commission status within IASPEI/IUGG and as such is the international body that governs data exchange formats and access protocols within seismology. The CoopEUS project involves IRIS and UNAVCO as part of the EarthScope project and the European collaborators are all members of the European Plate Observing System (EPOS). CoopEUS includes one work package that attempts to coordinate data access between EarthScope and EPOS facilities. IRIS has worked with its partners in the FDSN to develop and adopt three key international service standards within seismology. These include 1) fdsn-dataselect, a service that returns time series data in a variety of standard formats, 2) fdsn-station, a service that returns related metadata about a seismic station in stationXML format, and 3) fdsn-event, a service that returns information about earthquakes and other seismic events in QuakeML format. Currently the 5 European data centers supporting these services include the ORFEUS Data Centre in the Netherlands, the GFZ German Research Centre for Geosciences in Potsdam, Germany, ETH Zurich in Switzerland, INGV in Rome, Italy, and the RESIF Data Centre in Grenoble France. Presently these seven centres can all be accessed using standardized web services with identical service calls and returns results in standardized ways. IRIS is developing an IRIS federator that will allow a client to seamlessly access information across the federated centers. Details and current status of the IRIS Federator will be presented.

  7. Project Execution Plan,Rev. 3; FINAL

    International Nuclear Information System (INIS)

    IT Corporation, Las Vegas

    2002-01-01

    This plan addresses project activities encompassed by the U.S. Department of Energy's (DOE's), National Nuclear Security Administration Nevada Operations Office, Environmental Restoration Division and conforms to the requirements contained in the Life-Cycle Asset Management, DOE Order 430.1A; The Joint Program Office Policy on Project Management in Support of DOE Order 430.1; Program and Project Management for the Acquisition of Capital Assets, DOE Order 413.3; the Project Execution and Engineering Management Planning Guide, GPG-FM-010; and other applicable Good Practice Guides; and the FY 2001 Integrated Planning, Accountability, and Budgeting System Policy Guidance. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense; and traditional project management philosophies such as the development of life-cycle costs, schedules, and work scope; identification o f roles and responsibilities; and baseline management and controls

  8. Evaluating Managerial Styles for System Development Life Cycle Stages to Ensure Software Project Success

    Science.gov (United States)

    Kocherla, Showry

    2012-01-01

    Information technology (IT) projects are considered successful if they are completed on time, within budget, and within scope. Even though, the required tools and methodologies are in place, IT projects continue to fail at a higher rate. Current literature lacks explanation for success within the stages of system development life-cycle (SDLC) such…

  9. Wikis and Collaborative Writing Applications in Health Care: A Scoping Review Protocol

    Science.gov (United States)

    van de Belt, Tom H; Grajales III, Francisco J; Eysenbach, Gunther; Aubin, Karine; Gold, Irving; Gagnon, Marie-Pierre; Kuziemsky, Craig E; Turgeon, Alexis F; Poitras, Julien; Faber, Marjan J; Kremer, Jan A.M; Heldoorn, Marcel; Bilodeau, Andrea; Légaré, France

    2012-01-01

    The rapid rise in the use of collaborative writing applications (eg, wikis, Google Documents, and Google Knol) has created the need for a systematic synthesis of the evidence of their impact as knowledge translation (KT) tools in the health care sector and for an inventory of the factors that affect their use. While researchers have conducted systematic reviews on a range of software-based information and communication technologies as well as other social media (eg, virtual communities of practice, virtual peer-to-peer communities, and electronic support groups), none have reviewed collaborative writing applications in the medical sector. The overarching goal of this project is to explore the depth and breadth of evidence for the use of collaborative writing applications in health care. Thus, the purposes of this scoping review will be to (1) map the literature on collaborative writing applications; (2) compare the applications’ features; (3) describe the evidence of each application’s positive and negative effects as a KT intervention in health care; (4) inventory and describe the barriers and facilitators that affect the applications’ use; and (5) produce an action plan and a research agenda. A six-stage framework for scoping reviews will be used: (1) identifying the research question; (2) identifying relevant studies within the selected databases (using the EPPI-Reviewer software to classify the studies); (3) selecting studies (an iterative process in which two reviewers search the literature, refine the search strategy, and review articles for inclusion); (4) charting the data (using EPPI-Reviewer’s data-charting form); (5) collating, summarizing, and reporting the results (performing a descriptive, numerical, and interpretive synthesis); and (6) consulting knowledge users during three planned meetings. Since this scoping review concerns the use of collaborative writing applications as KT interventions in health care, we will use the Knowledge to Action

  10. Draft Executive Summary Hawaii Geothermal Project - EIS Scoping Meetings

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-03-01

    After introductions by the facilitator and the program director from DOE, process questions were entertained. It was also sometimes necessary to make clarifications as to process throughout the meetings. Topics covered federal involvement in the HGP-EIS; NEPA compliance; public awareness, review, and access to information; Native Hawaiian concerns; the record of decision, responsibility with respect to international issues; the impacts of prior and on-going geothermal development activities; project definition; alternatives to the proposed action; necessary studies; Section 7 consultations; socioeconomic impacts; and risk analysis. Presentations followed, in ten meetings, 163 people presented issues and concerns, 1 additional person raised process questions only.

  11. 28 CFR 541.40 - Purpose and scope.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Purpose and scope. 541.40 Section 541.40 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE INSTITUTIONAL MANAGEMENT INMATE DISCIPLINE AND SPECIAL HOUSING UNITS Control Unit Programs § 541.40 Purpose and scope. (a) In an effort to...

  12. 22 CFR 171.40 - Purpose and scope.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Purpose and scope. 171.40 Section 171.40... PUBLIC Ethics in Government Act Provisions § 171.40 Purpose and scope. This subpart sets forth the... 2634, require that high-level Federal officials disclose publicly their personal financial interests. ...

  13. 28 CFR 16.21 - Purpose and scope.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Purpose and scope. 16.21 Section 16.21 Judicial Administration DEPARTMENT OF JUSTICE PRODUCTION OR DISCLOSURE OF MATERIAL OR INFORMATION Production or Disclosure in Federal and State Proceedings § 16.21 Purpose and scope. (a) This subpart sets...

  14. 28 CFR 513.10 - Purpose and scope.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Purpose and scope. 513.10 Section 513.10 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE GENERAL MANAGEMENT AND ADMINISTRATION ACCESS TO RECORDS Production or Disclosure of FBI/NCIC Information § 513.10 Purpose and scope. This...

  15. 12 CFR 41.20 - Scope and definitions.

    Science.gov (United States)

    2010-01-01

    ... Affiliate Marketing § 41.20 Scope and definitions. (a) Scope. This subpart applies to national banks...-existing business relationship. (i) In general. The term “pre-existing business relationship” means a relationship between a person, or a person's licensed agent, and a consumer based on— (A) A financial contract...

  16. 40 CFR 57.801 - Purpose and scope.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Purpose and scope. 57.801 Section 57.801 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Technology § 57.801 Purpose and scope. (a) This subpart shall govern all proceedings for the waiver of the...

  17. 29 CFR 4245.1 - Purpose and scope.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Purpose and scope. 4245.1 Section 4245.1 Labor Regulations Relating to Labor (Continued) PENSION BENEFIT GUARANTY CORPORATION INSOLVENCY, REORGANIZATION, TERMINATION, AND OTHER RULES APPLICABLE TO MULTIEMPLOYER PLANS NOTICE OF INSOLVENCY § 4245.1 Purpose and scope. (a...

  18. 5 CFR 1215.1 - Purpose and scope.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Purpose and scope. 1215.1 Section 1215.1 Administrative Personnel MERIT SYSTEMS PROTECTION BOARD ORGANIZATION AND PROCEDURES DEBT MANAGEMENT Salary Offset § 1215.1 Purpose and scope. (a) This regulation provides procedures for the collection by administrative...

  19. 37 CFR 204.1 - Purposes and scope.

    Science.gov (United States)

    2010-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2010-07-01 2010-07-01 false Purposes and scope. 204.1 Section 204.1 Patents, Trademarks, and Copyrights COPYRIGHT OFFICE, LIBRARY OF CONGRESS COPYRIGHT OFFICE AND PROCEDURES PRIVACY ACT: POLICIES AND PROCEDURES § 204.1 Purposes and scope. The purposes of these...

  20. Concrete decontamination scoping tests

    International Nuclear Information System (INIS)

    Archibald, K.E.

    1995-01-01

    This report details the research efforts and scoping tests performed at the Idaho Chemical Process Plant using scabbling, chemical, and electro-osmotic decontamination techniques on radiologically contaminated concrete

  1. Project Quality Assurance Plan for research and development services provided by Oak Ridge National Laboratory in support of the Westinghouse Materials Company of Ohio Operable Unit 1 Stabilization Development and Treatability Studies Program

    Energy Technology Data Exchange (ETDEWEB)

    Gilliam, T.M.

    1991-05-01

    This Project Quality Assurance Plan (PQAP) sets forth the quality assurance (QA) requirements that are applied to those elements of the Westinghouse Materials Company of Ohio (WMCO) Operable Unit 1 support at Oak Ridge National Laboratory (ORNL) project that involve research and development (R D) performed at ORNL. This is in compliance with the applicable criteria of 10 CFR Part 50, Appendix B, ANSI/ASME NQA-1, as specified by Department of Energy (DOE) Oak Ridge Operations (ORO) Order 5700.6B. For this application, NQA-1 is the core QA Program requirements document. QA policy, normally found in the requirements document, is contained herein. The requirements of this PQAP apply to project activities that affect the quality and reliability/credibility of research, development, and investigative data and documentation. These activities include the functions of attaining quality objectives and assuring that an appropriate QA program scope is established. The scope of activities affecting quality includes organization; personnel training and qualifications; design control; procurement; material handling and storage; operating procedures; testing, surveillance, and auditing; R D investigative activities and documentation; deficiencies; corrective actions; and QA record keeping. 12 figs.

  2. Patient safety culture in care homes for older people: a scoping review

    Directory of Open Access Journals (Sweden)

    Emily Gartshore

    2017-11-01

    Full Text Available Abstract Background In recent years, there has been an increasing focus on the role of safety culture in preventing incidents such as medication errors and falls. However, research and developments in safety culture has predominantly taken place in hospital settings, with relatively less attention given to establishing a safety culture in care homes. Despite safety culture being accepted as an important quality indicator across all health and social care settings, the understanding of culture within social care settings remains far less developed than within hospitals. It is therefore important that the existing evidence base is gathered and reviewed in order to understand safety culture in care homes. Methods A scoping review was undertaken to describe the availability of evidence related to care homes’ patient safety culture, what these studies focused on, and identify any knowledge gaps within the existing literature. Included papers were each reviewed by two authors for eligibility and to draw out information relevant to the scoping review. Results Twenty-four empirical papers and one literature review were included within the scoping review. The collective evidence demonstrated that safety culture research is largely based in the USA, within Nursing Homes rather than Residential Home settings. Moreover, the scoping review revealed that empirical evidence has predominantly used quantitative measures, and therefore the deeper levels of culture have not been captured in the evidence base. Conclusions Safety culture in care homes is a topic that has not been extensively researched. The review highlights a number of key gaps in the evidence base, which future research into safety culture in care home should attempt to address.

  3. Identifying attributes of food literacy: a scoping review.

    Science.gov (United States)

    Azevedo Perry, Elsie; Thomas, Heather; Samra, H Ruby; Edmonstone, Shannon; Davidson, Lyndsay; Faulkner, Amy; Petermann, Lisa; Manafò, Elizabeth; Kirkpatrick, Sharon I

    2017-09-01

    An absence of food literacy measurement tools makes it challenging for nutrition practitioners to assess the impact of food literacy on healthy diets and to evaluate the outcomes of food literacy interventions. The objective of the present scoping review was to identify the attributes of food literacy. A scoping review of peer-reviewed and grey literature was conducted and attributes of food literacy identified. Subjects included in the search were high-risk groups. Eligible articles were limited to research from Canada, USA, the UK, Australia and New Zealand. The search identified nineteen peer-reviewed and thirty grey literature sources. Fifteen identified food literacy attributes were organized into five categories. Food and Nutrition Knowledge informs decisions about intake and distinguishing between 'healthy' and 'unhealthy' foods. Food Skills focuses on techniques of food purchasing, preparation, handling and storage. Self-Efficacy and Confidence represent one's capacity to perform successfully in specific situations. Ecologic refers to beyond self and the interaction of macro- and microsystems with food decisions and behaviours. Food Decisions reflects the application of knowledge, information and skills to make food choices. These interdependent attributes are depicted in a proposed conceptual model. The lack of evaluated tools inhibits the ability to assess and monitor food literacy; tailor, target and evaluate programmes; identify gaps in programming; engage in advocacy; and allocate resources. The present scoping review provides the foundation for the development of a food literacy measurement tool to address these gaps.

  4. Negative affect varying in motivational intensity influences scope of memory.

    Science.gov (United States)

    Threadgill, A Hunter; Gable, Philip A

    2018-04-06

    Emotions influence cognitive processes involved in memory. While some research has suggested that cognitive scope is determined by affective valence, recent models of emotion-cognition interactions suggest that motivational intensity, rather than valence, influences these processes. The present research was designed to clarify how negative affects differing in motivational intensity impact memory for centrally or peripherally presented information. Experiments 1 & 2 found that, relative to a neutral condition, high intensity negative affect (anger) enhances memory for centrally presented information. Experiment 3 replicated this effect using another high intensity negative affect (threat). Experiment 4 extended this by finding that, relative to a neutral condition, low intensity negative affect (sadness) enhanced memory for peripherally presented information. Finally, in Experiment 5, the effects of sadness and threat on scope of memory were directly compared, finding that threat narrowed scope of memory, while sadness broadened scope of memory. Together, these results provide additional support for the motivational dimensional model of cognitive scope, in that high intensity emotions narrow cognitive scope, while low intensity emotions broaden cognitive scope.

  5. Networked Microgrids Scoping Study

    Energy Technology Data Exchange (ETDEWEB)

    Backhaus, Scott N. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Dobriansky, Larisa [General MicroGrids, San Diego, CA (United States); Glover, Steve [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Liu, Chen-Ching [Washington State Univ., Pullman, WA (United States); Looney, Patrick [Brookhaven National Lab. (BNL), Upton, NY (United States); Mashayekh, Salman [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Pratt, Annabelle [National Renewable Energy Lab. (NREL), Golden, CO (United States); Schneider, Kevin [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Stadler, Michael [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Starke, Michael [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Wang, Jianhui [Argonne National Lab. (ANL), Argonne, IL (United States); Yue, Meng [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2016-12-05

    Much like individual microgrids, the range of opportunities and potential architectures of networked microgrids is very diverse. The goals of this scoping study are to provide an early assessment of research and development needs by examining the benefits of, risks created by, and risks to networked microgrids. At this time there are very few, if any, examples of deployed microgrid networks. In addition, there are very few tools to simulate or otherwise analyze the behavior of networked microgrids. In this setting, it is very difficult to evaluate networked microgrids systematically or quantitatively. At this early stage, this study is relying on inputs, estimations, and literature reviews by subject matter experts who are engaged in individual microgrid research and development projects, i.e., the authors of this study The initial step of the study gathered input about the potential opportunities provided by networked microgrids from these subject matter experts. These opportunities were divided between the subject matter experts for further review. Part 2 of this study is comprised of these reviews. Part 1 of this study is a summary of the benefits and risks identified in the reviews in Part 2 and synthesis of the research needs required to enable networked microgrids.

  6. Scoping in environmental impact assessment: Balancing precaution and efficiency?

    International Nuclear Information System (INIS)

    Snell, Tim; Cowell, Richard

    2006-01-01

    Scoping is a crucial yet under-researched stage of environmental impact assessment, in which practice falls well behind conceptual ideals. We argue that such 'implementation deficits' reflect dilemmas between two key rationales for scoping - environmental precaution and decision-making efficiency - and between technical and participatory conceptions of the decision-making process. We use qualitative research to understand how scoping practice in the UK reconciles these competing imperatives. Our findings suggest that practitioners mainly rationalise their approach in terms of decision-making efficiency, while justifying excluding the public from scoping on grounds of prematurity, delay and risks of causing confusion. The tendency to scope issues in rather than exclude them reflects a pervasive concern for legal challenge, rather than environmental precaution, but this reinforces standard lists of environmental considerations rather than the investigation of novel, cumulative or indirect risks

  7. SB LOCA analyses for Krsko Full Scope Simulator verification

    International Nuclear Information System (INIS)

    Prosek, A.; Parzer, I.; Mavko, B.

    2000-01-01

    Nuclear power plant simulators are intended to be used for training and maintaining competence to ensure safe, reliable operation of nuclear power plants throughout the world. The simulator shall be specified to a reference unit and its performance validation testing shall be provided. In this study a small-break loss-of-coolant accident (SB LOCA) response of Krsko nuclear power plant (NPP) was calculated for full scope simulator verification. The investigation included five cases with varying the break size in the cold leg of reactor coolant system. The plant specific and verified RELAP5/MOD2 model of Krsko nuclear power plant (NPP), developed in the past for 1882 MWt power, was adapted for 2000 MWt power (cycle 17) including the model for replacement steam generators. The results showed that the plant system response to breaks with small break area was slower compared to breaks with larger break area. The core heatup occurred in most of the cases analyzed. The acceptance criteria for emergency core cooling system were also met. The predicted results of the SB LOCA analysis for Krsko NPP suggest that they may be used for verification of the Krsko Full Scope Simulator performance. (author)

  8. Adoption of e-health technology by physicians: a scoping review

    Directory of Open Access Journals (Sweden)

    de Grood C

    2016-08-01

    Full Text Available Chloe de Grood,1 Aida Raissi,2 Yoojin Kwon,3 Maria Jose Santana1 1Department of Community Health Sciences, W21C Research and Innovation Centre, University of Calgary, Calgary, 2University of Alberta, Edmonton, AB, 3Toronto Public Library, Toronto, ON, Canada Objective: The goal of this scoping review was to summarize the current literature identifying barriers and opportunities that facilitate adoption of e-health technology by physicians.Design: Scoping review.Setting: MEDLINE, EMBASE, and PsycINFO databases as provided by Ovid were searched from their inception to July 2015. Studies captured by the search strategy were screened by two reviewers and included if the focus was on barriers and facilitators of e-health technology adoption by physicians.Results: Full-text screening yielded 74 studies to be included in the scoping review. Within those studies, eleven themes were identified, including cost and liability issues, unwillingness to use e-health technology, and training and support.Conclusion: Cost and liability issues, unwillingness to use e-health technology, and training and support were the most frequently mentioned barriers and facilitators to the adoption of e-health technology. Government-level payment incentives and privacy laws to protect health information may be the key to overcome cost and liability issues. The adoption of e-health technology may be facilitated by tailoring to the individual physician’s knowledge of the e-health technology and the use of follow-up sessions for physicians and on-site experts to support their use of the e-health technology. To ensure the effective uptake of e-health technologies, physician perspectives need to be considered in creating an environment that enables the adoption of e-health strategies. Keywords: medical informatics, electronic medical records, diffusion of innovation, attitude of health personnel, information seeking behavior

  9. 77 FR 9893 - Notice of Scope Rulings

    Science.gov (United States)

    2012-02-21

    ... feedstock exported from the PRC to Mexico and then processed into granular magnesium before exportation to... exported from Japan is within the scope of the antidumping duty and countervailing duty orders; requested... electric blanket is not within the scope of the antidumping duty order; April 14, 2011. Japan A-588-804...

  10. 32 CFR 99.1 - Scope and purpose.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Scope and purpose. 99.1 Section 99.1 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE PERSONNEL, MILITARY AND CIVILIAN PROCEDURES FOR STATES AND LOCALITIES TO REQUEST INDEMNIFICATION § 99.1 Scope and purpose. (a) The Department...

  11. 48 CFR 504.500 - Scope of subpart.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Scope of subpart. 504.500 Section 504.500 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION GENERAL ADMINISTRATIVE MATTERS Electronic Commerce in Contracting 504.500 Scope of subpart. This subpart provides policy and procedure for use of GSA's Electronic...

  12. 30 CFR 259.001 - Purpose and scope.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Purpose and scope. 259.001 Section 259.001 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE MINERAL LEASING: DEFINITIONS § 259.001 Purpose and scope. The purpose of this part 259 is to define various terms appearing in...

  13. 10 CFR 440.1 - Purpose and scope.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Purpose and scope. 440.1 Section 440.1 Energy DEPARTMENT... scope. This part implements a weatherization assistance program to increase the energy efficiency of... with children, high residential energy users, and households with high energy burden. [65 FR 77217, Dec...

  14. 50 CFR 19.2 - Scope of regulations.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Scope of regulations. 19.2 Section 19.2... PLANTS (CONTINUED) AIRBORNE HUNTING Introduction § 19.2 Scope of regulations. The regulations contained... United States citizens whether within the territorial jurisdiction of the United States or on the high...

  15. 10 CFR 63.1 - Purpose and scope.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Purpose and scope. 63.1 Section 63.1 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA General Provisions § 63.1 Purpose and scope. This part prescribes rules governing the...

  16. Scoping Study Investigating PWR Instrumentation during a Severe Accident Scenario

    Energy Technology Data Exchange (ETDEWEB)

    Rempe, J. L. [Rempe and Associates, LLC, Idaho Falls, ID (United States); Knudson, D. L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Lutz, R. J. [Lutz Nuclear Safety Consultant, LLC, Asheville, NC (United States)

    2015-09-01

    The accidents at the Three Mile Island Unit 2 (TMI-2) and Fukushima Daiichi Units 1, 2, and 3 nuclear power plants demonstrate the critical importance of accurate, relevant, and timely information on the status of reactor systems during a severe accident. These events also highlight the critical importance of understanding and focusing on the key elements of system status information in an environment where operators may be overwhelmed with superfluous and sometimes conflicting data. While progress in these areas has been made since TMI-2, the events at Fukushima suggests that there may still be a potential need to ensure that critical plant information is available to plant operators. Recognizing the significant technical and economic challenges associated with plant modifications, it is important to focus on instrumentation that can address these information critical needs. As part of a program initiated by the Department of Energy, Office of Nuclear Energy (DOE-NE), a scoping effort was initiated to assess critical information needs identified for severe accident management and mitigation in commercial Light Water Reactors (LWRs), to quantify the environment instruments monitoring this data would have to survive, and to identify gaps where predicted environments exceed instrumentation qualification envelop (QE) limits. Results from the Pressurized Water Reactor (PWR) scoping evaluations are documented in this report. The PWR evaluations were limited in this scoping evaluation to quantifying the environmental conditions for an unmitigated Short-Term Station BlackOut (STSBO) sequence in one unit at the Surry nuclear power station. Results were obtained using the MELCOR models developed for the US Nuclear Regulatory Commission (NRC)-sponsored State of the Art Consequence Assessment (SOARCA) program project. Results from this scoping evaluation indicate that some instrumentation identified to provide critical information would be exposed to conditions that

  17. A novel three-dimensional and high-definition flexible scope.

    Science.gov (United States)

    Nishiyama, Kenichi; Natori, Yoshihiro; Oka, Kazunari

    2014-06-01

    Recent high-tech innovations in digital surgical technology have led to advances in three-dimensional (3D) and high-definition (HD) operating scopes. We introduce a novel 3D-HD flexible surgical scope called "3D-Eye-Flex" and evaluate its utility as an alternative to the operating microscope. The 3D-Eye-Flex has a 15 mm long 3D-HD scope-head with a 15 mm outer diameter, a focus distance of 18-100 mm and 80° angle of view. Attached to a 615-mm-long flexible bellows, 3D-Eye-Flex can be easily fixed to the operating table. Microsurgical dissection of wet brain tissue and drilling a skull base model were performed under the scope while using the 3D-HD video monitor. This scope system provided excellent illumination and image quality during the procedures. A large depth of field with stereoscopic vision had a greater advantage over using an operating microscope. 3D-Eye-Flex was easy to manipulate and provided an abundance of space above the operative field. Surgeons felt comfortable while working and could easily shift the position of the scope. This novel 3D-HD flexible scope is an effective alternative to the operating microscope as a new surgeon's eye and will be suitable for digital image-based surgery with further refinement.

  18. Modern Distance Education Project for the Rural Schools of China: Recent Development and Problems

    Science.gov (United States)

    Yu, S. Q.; Wang, Minjuan J.

    2006-01-01

    The Modern Distance Education Project for the Rural Schools (MDEPRS) of China has a wider scope and serves a larger population than any other informational project in the world. It likely will result in a far-reaching informational revolution for basic education in China. Here, we introduce three main innovative models of material delivery, the…

  19. Federal Energy Savings Performance Contracts: Frequently Asked Questions on the Scope of 42 U.S.C. § 8287 et seq.

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2016-12-21

    Document provides clarification and guidance on issues commonly raised regarding the scope of 42 U.S.C. § 8287 et seq. It is a supplement to the Federal Energy Management Program's extensive collection of materials that are available to assist federal agencies execute successful energy savings performance contract (ESPC) projects.

  20. CMIP5-based global wave climate projections including the entire Arctic Ocean

    Science.gov (United States)

    Casas-Prat, M.; Wang, X. L.; Swart, N.

    2018-03-01

    This study presents simulations of the global ocean wave climate corresponding to the surface winds and sea ice concentrations as simulated by five CMIP5 (Coupled Model Intercomparison Project Phase 5) climate models for the historical (1979-2005) and RCP8.5 scenario future (2081-2100) periods. To tackle the numerical complexities associated with the inclusion of the North Pole, the WAVEWATCH III (WW3) wave model was used with a customized unstructured Spherical Multi-Cell grid of ∼100 km offshore and ∼50 km along coastlines. The climate model simulated wind and sea ice data, and the corresponding WW3 simulated wave data, were evaluated against reanalysis and hindcast data. The results show that all the five sets of wave simulations projected lower waves in the North Atlantic, corresponding to decreased surface wind speeds there in the warmer climate. The selected CMIP5 models also consistently projected an increase in the surface wind speed in the Southern Hemisphere (SH) mid-high latitudes, which translates in an increase in the WW3 simulated significant wave height (Hs) there. The higher waves are accompanied with increased peak wave period and increased wave age in the East Pacific and Indian Oceans, and a significant counterclockwise rotation in the mean wave direction in the Southern Oceans. The latter is caused by more intense waves from the SH traveling equatorward and developing into swells. Future wave climate in the Arctic Ocean in summer is projected to be predominantly of mixed sea states, with the climatological mean of September maximum Hs ranging mostly 3-4 m. The new waves approaching Arctic coasts will be less fetch-limited as ice retreats since a predominantly southwards mean wave direction is projected in the surrounding seas.

  1. Project safety as a sustainable competitive advantage.

    Science.gov (United States)

    Rechenthin, David

    2004-01-01

    To be consistently profitable, a construction company must complete projects in scope, on schedule, and on budget. At the same time, the nature of the often high-risk work performed by construction companies can result in high accident rates. Clients and other stakeholders are placing increasing pressure on companies to decrease those accident rates. Clients routinely demand copies of safety plans and evidence of past results at the "pre-qualification" or "request for proposal" stages of the procurement process. Are high accident rates and the associated costs just a part of business? Companies that deliver on scope, schedule, and budget have a competitive advantage. Is it possible for projects with low accident rates to use it as a competitive advantage? Is the value added by safety just a temporary or parity issue, or does a successful safety program offer significant advantage to the company and the client? This article concludes that in the case of a high-risk industry, such as the construction industry, an organization with a successful safety program can promote safety performance as a sustainable competitive advantage. It is a choice the company can make.

  2. 10 CFR 1009.1 - Purpose and scope.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Purpose and scope. 1009.1 Section 1009.1 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) GENERAL POLICY FOR PRICING AND CHARGING FOR MATERIALS AND SERVICES SOLD BY DOE § 1009.1 Purpose and scope. (a) This part establishes Department of Energy policy for...

  3. 25 CFR 39.1000 - Purpose and scope.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Purpose and scope. 39.1000 Section 39.1000 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Administrative Cost Formula § 39.1000 Purpose and scope. The purpose of this subpart is to provide funds at the...

  4. 40 CFR 82.150 - Purpose and scope.

    Science.gov (United States)

    2010-07-01

    ...) PROTECTION OF STRATOSPHERIC OZONE Recycling and Emissions Reduction § 82.150 Purpose and scope. (a) The purpose of this subpart is to reduce emissions of class I and class II refrigerants and their substitutes... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Purpose and scope. 82.150 Section 82...

  5. 45 CFR 63.1 - Purpose and scope.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Purpose and scope. 63.1 Section 63.1 Public... OFFICE OF THE ASSISTANT SECRETARY FOR PLANNING AND EVALUATION General § 63.1 Purpose and scope. (a... analyses, and demonstrations and evaluations which have demonstrated a high probability of impacting on the...

  6. 28 CFR 550.10 - Purpose and scope.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Purpose and scope. 550.10 Section 550.10... Alcohol Testing § 550.10 Purpose and scope. The Bureau of Prisons maintains a surveillance program in..., or who are considered high risks based on behavior observed or on information received by staff. (a...

  7. 50 CFR 85.10 - Purpose and scope.

    Science.gov (United States)

    2010-10-01

    ...) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM CLEAN VESSEL ACT GRANT PROGRAM General § 85.10 Purpose and scope. The purpose of this part is to establish requirements for state participation in the... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Purpose and scope. 85.10 Section 85.10...

  8. 10 CFR 420.1 - Purpose and scope.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Purpose and scope. 420.1 Section 420.1 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION STATE ENERGY PROGRAM General Provisions for State Energy Program Financial Assistance § 420.1 Purpose and scope. It is the purpose of this part to promote the conservation...

  9. 28 CFR 549.60 - Purpose and scope.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Purpose and scope. 549.60 Section 549.60 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE INSTITUTIONAL MANAGEMENT MEDICAL SERVICES Hunger Strikes, Inmate § 549.60 Purpose and scope. The Bureau of Prisons provides guidelines for the medical and administrative management of...

  10. Experiences in managing the Prometheus Project

    Science.gov (United States)

    Lehman, David H.; Clark, Karla B.; Cook, Beverly A.; Gavit, Sarah A.; Kayali, Sammy A.; McKinney, John C.; Milkovich, David C.; Reh, Kim R.; Taylor, Randall L.; Casani, John R.

    2006-01-01

    Congress authorized NASA?s Prometheus Project in February 2003, with the first Prometheus mission slated to explore the icy moons of Jupiter. The Project had two major objectives: (1) to develop a nuclear reactor that would provide unprecedented levels of power and show that it could be processed safely and operated reliably in space for long-duration, deep-space exploration and (2) to explore the three icy moons of Jupiter - Callisto, Ganymede, and Europa - and return science data that would meet the scientific goals as set forth in the Decadal Survey Report of the National Academy of Sciences. Early in Project planning, it was determined that the development of the Prometheus nuclear powered Spaceship would be complex and require the intellectual knowledge residing at numerous organizations across the country. In addition, because of the complex nature of the Project and the multiple partners, approaches beyond those successfully used to manage a typical JPL project would be needed. This paper1 will describe the key experiences in managing Prometheus that should prove useful for future projects of similar scope and magnitude

  11. Project Management Plan for Initial Tank Retrieval Systems, Project W-211

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    1999-01-01

    Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for future processing plants, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AP-108, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the Privatized waste processing plant and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump based retrieval system for any DST. This Project Management Plan (PMP) documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering

  12. The life cycle management of the analogical I and C in NPP modernization project

    International Nuclear Information System (INIS)

    Wang Hongtao

    2014-01-01

    The existing NPPS (nuclear power plants) are subject for the ageing and obsolete problems of the analogue I and C systems. The large scope I and C upgrade project based on the DCS technology has the following challenged characteristics: the complicated technology, the broad impacts, the big investment and the long implementation period. This document gives a preliminary introduction and analysis from the aspects including the motives for the upgrade, I and C design base, the digital technology characteristics, I and C function analysis, I and C safety classification, I and C architecture, life-cycle-management mission for the related stages. Considering the experiences and lessons learned from the similar I and C upgrade projects in foreign NPPS, the conclusion and recommendation is given for I and C modernization based on the digital technology. (author)

  13. Measuring social exclusion in healthcare settings: a scoping review.

    Science.gov (United States)

    O'Donnell, Patrick; O'Donovan, Diarmuid; Elmusharaf, Khalifa

    2018-02-02

    Social exclusion is a concept that has been widely debated in recent years; a particular focus of the discussion has been its significance in relation to health. The meanings of the phrase "social exclusion", and the closely associated term "social inclusion", are contested in the literature. Both of these concepts are important in relation to health and the area of primary healthcare in particular. Thus, several tools for the measurement of social exclusion or social inclusion status in health care settings have been developed. A scoping review of the peer-reviewed and grey literature was conducted to examine tools developed since 2000 that measure social exclusion or social inclusion. We focused on those measurement tools developed for use with individual patients in healthcare settings. Efforts were made to obtain a copy of each of the original tools, and all relevant background literature. All tools retrieved were compared in tables, and the specific domains that were included in each measure were tabulated. Twenty-two measurement tools were included in the final scoping review. The majority of these had been specifically developed for the measurement of social inclusion or social exclusion, but a small number were created for the measurement of other closely aligned concepts. The majority of the tools included were constructed for engaging with patients in mental health settings. The tools varied greatly in their design, the scoring systems and the ways they were administered. The domains covered by these tools varied widely and some of the tools were quite narrow in the areas of focus. A review of the definitions of both social inclusion and social exclusion also revealed the variations among the explanations of these complex concepts. There are several definitions of both social inclusion and social exclusion in use and they differ greatly in scope. While there are many tools that have been developed for measuring these concepts in healthcare settings, these

  14. Scoping Review on Research on Food conducted in the Faculty of Social Sciences. Including other Institutions in the Norwich Research Park and Beyond

    OpenAIRE

    Howard Wilsher, Stephanie

    2014-01-01

    Executive summary The scoping review was commissioned to examine what research on food has been conducted in the Faculty of Social Sciences (SSF) at the University of East Anglia (UEA) since 2005. The aim of the report is to facilitate collaborative research between SSF and the rest of the Norwich Research Park (NRP), in particular, the Institute of Food Research (IFR). However, it is important to contextualise this beyond the NRP as the Eastern Academic Research Consortium (EARC) provides fu...

  15. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    International Nuclear Information System (INIS)

    Gelles, C. M.; Sheppard, F. R.

    2002-01-01

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program

  16. 17 CFR 248.101 - Purpose and scope.

    Science.gov (United States)

    2010-04-01

    ...) REGULATIONS S-P AND S-AM Regulation S-AM: Limitations on Affiliate Marketing § 248.101 Purpose and scope. (a...”), regulates the use of consumer information received from an affiliate to make marketing solicitations. (b) Scope. This subpart applies to any broker or dealer other than a notice-registered broker or dealer, to...

  17. 12 CFR 503.1 - Scope and procedures.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Scope and procedures. 503.1 Section 503.1 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY PRIVACY ACT § 503.1 Scope and... & Services Division, Office of Thrift Supervision, 1700 G Street, NW., Washington, DC 20552. (c) Requests for...

  18. 45 CFR 148.306 - Basis and scope.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Basis and scope. 148.306 Section 148.306 Public... FOR THE INDIVIDUAL HEALTH INSURANCE MARKET Grants to States for Operation of Qualified High Risk Pools § 148.306 Basis and scope. This subpart implements section 2745 of the Public Health Service Act (PHS...

  19. 50 CFR 660.701 - Purpose and scope.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 9 2010-10-01 2010-10-01 false Purpose and scope. 660.701 Section 660.701... Purpose and scope. This subpart implements the Fishery Management Plan for U.S. West Coast Fisheries for... the U.S. EEZ off the coasts of Washington, Oregon, and California and in adjacent high seas waters. ...

  20. 28 CFR 544.70 - Purpose and scope.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Purpose and scope. 544.70 Section 544.70... Literacy Program § 544.70 Purpose and scope. Except as provided for in § 544.71, an inmate confined in a federal institution who does not have a verified General Educational Development (GED) credential or high...