  1. Project control integrating cost and schedule in construction

    CERN Document Server

    Del Pico, Wayne J

    2013-01-01

    The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.

  2. Understanding Applications of Project Planning and Scheduling in Construction Projects

    OpenAIRE

    AlNasseri, Hammad Abdullah

    2015-01-01

    Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholders’ needs. However, there is increasing concern about whether know-how effectively improves understanding of underlying theories of project management processes for construction organizations and their project managers. Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance, but many worldwide constru...

  3. REPNET: project scheduling and workflow optimization for Construction Projects

    Directory of Open Access Journals (Sweden)

    Marco Alvise Bragadin

    2013-10-01

    Full Text Available Project planning and control are core processes for construction management. In practice project planning is achieved by network - based techniques like Precedence Diagramming Method (PDM.Indeed many researchers and practitioners claims that networking techniques as such do not provide a suitable model for construction projects. Construction process modeling should incorporate for specific features of resource flows through project activities. So an improved resource scheduling method for construction is developed, called REPNET, based on a precedence network plotted on a resource–space chart and presented with a flow-line chart. The heuristics of REPNET are used to carry out resource timing while optimizing processes flows and resource usage. The method has been tested on a sample project.

  4. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  5. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  6. Clinch River Breeder Reactor Plant Project: construction schedule

    International Nuclear Information System (INIS)

    Purcell, W.J.; Martin, E.M.; Shivley, J.M.

    1982-01-01

    The construction schedule for the Clinch River Breeder Reactor Plant and its evolution are described. The initial schedule basis, changes necessitated by the evaluation of the overall plant design, and constructability improvements that have been effected to assure adherence to the schedule are presented. The schedule structure and hierarchy are discussed, as are tools used to define, develop, and evaluate the schedule

  7. Effect of Pre-Construction on Construction Schedule and Client Loyalty

    OpenAIRE

    Jong Hoon Kim; Hyun-Soo Lee; Moonseo Park; Min Jeong; Inbeom Lee

    2016-01-01

    Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client sat...

  8. Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to a Large Scale Hydropower Construction Project

    Science.gov (United States)

    Xu, Jiuping

    2014-01-01

    This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method. PMID:24550708

  9. Multimode resource-constrained multiple project scheduling problem under fuzzy random environment and its application to a large scale hydropower construction project.

    Science.gov (United States)

    Xu, Jiuping; Feng, Cuiying

    2014-01-01

    This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method.

  10. Schedule and staffing of a nuclear power project

    International Nuclear Information System (INIS)

    Polliart, A.J.; Csik, B.

    1977-01-01

    Establishment of construction schedule: a) preliminary construction schedule; b) PERT (Program Evaluation Review Techniques) analytical method; c) identify key milestone target dates; d) inter-action by participants and contribution to support revised construction schedule. - Construction schedule control: a) ability to update and modify construction schedule; b) alternate plans to circumvent restraints (problems); c) critical path activity-controls; d) continuous review and report system. - Updating construction site reports to include: 1) progress, 2) accomplishments, 3) potential problems and alternate plans; b) progress reports on related support services; c) total assessment of participating groups on schedule; d) information required by management for decisions. - Typical causes for delays in project schedule. (orig.) [de

  11. Schedule control in Ling Ao nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2007-01-01

    Ling Ao Nuclear Power Station (LANP) is first one built up by self-reliance in China with power capacity 990x2 MWe. The results of quality control, schedule control and cost control are satisfactory. The commercial operation days of Unit 1 and Unit 2 were 28th May 2002 and 8th Jan. 2003 respectively, which were 48 days and 66 days in advance of the project schedule. This paper presents the practices of self-reliance schedule control system in LANP. The paper includes 10 sections: schedule control system; targets of schedule control; schedule control at early stage of project; construction schedule; scheduling practice; Point curves; schedule control of design and procurement; a good practice of construction schedule control on site; commissioning and startup schedule; schedule control culture. Three figures are attached. The main contents of the self-reliance schedule control system are as follows: to draw up reasonable schedules and targets; to setup management mechanism and procedures; to organize powerful project management team; to establish close monitoring system; to provide timely progress reports and statistics information. Five kinds of schedule control targets are introduced, i.e. bar-chart schedule; milesones; Point curves; interface management; hydraulic test schedule of auxiliary piping loops; EMR/EMC/EESR issuance schedules. Six levels of bar-chart schedules were adopted in LANP, but the bar-chart schedules were not satisfactory for complicated erection condition on site, even using six levels of schedules. So a kind of Point curves was developed and their advantages are explained. Scheduling method of three elements: activity, duration, logic, which was adopted in LANP, is introduced. The duration of each piping activities in LANP level 2 project schedule was calculated based on the relevant working Point quantities. The analysis and adjustment of Point curves are illustrated, i.e. balance of monthly quantities; possible production in the peakload

  12. Next Generation CANDU: Conceptual Design for a Short Construction Schedule

    International Nuclear Information System (INIS)

    Hopwood, Jerry M.; Love, Ian J.W.; Elgohary, Medhat; Fairclough, Neville

    2002-01-01

    Atomic Energy of Canada Ltd. (AECL) has very successful experience in implementing new construction methods at the Qinshan (Phase III) twin unit CANDU 6 plant in China. This paper examines the construction method that must be implemented during the conceptual design phase of a project if short construction schedules are to be met. A project schedule of 48 months has been developed for the nth unit of NG (Next Generation) CANDU with a 42 month construction period from 1. Concrete to In-Service. An overall construction strategy has been developed involving paralleling project activities that are normally conducted in series. Many parts of the plant will be fabricated as modules and be installed using heavy lift cranes. The Reactor Building (RB), being on the critical path, has been the focus of considerable assessment, looking at alternative ways of applying the construction strategy to this building. A construction method has been chosen which will result in excess of 80% of internal work being completed as modules or as very streamlined traditional construction. This method is being further evaluated as the detailed layout proceeds. Other areas of the plant have been integrated into the schedule and new construction methods are being applied to these so that further modularization and even greater paralleling of activities will be achieved. It is concluded that the optimized construction method is a requirement, which must be implemented through all phases of design to make a 42 month construction schedule a reality. If the construction methods are appropriately chosen, the schedule reductions achieved will make nuclear more competitive. (authors)

  13. Research on information models for the construction schedule management based on the IFC standard

    Directory of Open Access Journals (Sweden)

    Weirui Xue

    2015-05-01

    Full Text Available Purpose: The purpose of this article is to study the description and extension of the Industry Foundation Classes (IFC standard in construction schedule management, which achieves the information exchange and sharing among the different information systems and stakeholders, and facilitates the collaborative construction in the construction projects. Design/methodology/approach: The schedule information processing and coordination are difficult in the complex construction project. Building Information Modeling (BIM provides the platform for exchanging and sharing information among information systems and stakeholders based on the IFC standard. Through analyzing the schedule plan, implementing, check and control, the information flow in the schedule management is reflected based on the IDEF. According to the IFC4, the information model for the schedule management is established, which not only includes the each aspect of the schedule management, but also includes the cost management, the resource management, the quality management and the risk management. Findings: The information requirement for the construction schedule management can be summarized into three aspects: the schedule plan information, the implementing information and the check and control information. The three aspects can be described through the existing and extended entities of IFC4, and the information models are established. Originality/value: The main contribution of the article is to establish the construction schedule management information model, which achieves the information exchange and share in the construction project, and facilitates the development of the application software to meet the requirements of the construction project.

  14. The Single And Multi Project Approach To Planning And Scheduling

    DEFF Research Database (Denmark)

    Andersson, Niclas

    2008-01-01

    The fragmentation of the construction industry in Denmark is reflected in the organisation of construction projects, which typically involves a large number of subcontractors. The main contractor, being responsible for the planning and scheduling of construction work, is thus faced with the chall......The fragmentation of the construction industry in Denmark is reflected in the organisation of construction projects, which typically involves a large number of subcontractors. The main contractor, being responsible for the planning and scheduling of construction work, is thus faced...

  15. New plant construction cost and schedule

    International Nuclear Information System (INIS)

    Akins, M. J.

    2009-01-01

    The presentation covers the following topics: cost structure; capital costs; variation of capital costs; trends in power plant construction; studies of costs completion; periods and risks. Nuclear plant costs have recently risen so rapidly that vendors are not willing to publicly commit to cost estimates: ∼ $2000/Kw overnight costs in 2006 in the US market > $4000/Kw and in 2008 in the US market > $6000/Kw in 2008 in emerging markets. There is vendors pricing uncertainty. Current contract models may not apply. Current construction projects have problems: Olkiluoto-3 is reported to be 50% over budget and two years behind schedule, increasing perceptions that nuclear costs will continue to increase rapidly; Price of materials is a big volatile unknown, which may decrease Labor could become more available due to limited number of new projects; Lack of debt/credit to finance new project may decrease demand of new construction

  16. Construction Managers’ Perception of the Factors Affecting Sustainability in Construction Projects

    OpenAIRE

    Reza Taheriattar; Morvarid Farzanehrafat

    2014-01-01

    Sustainable construction is a comprehensive concept which requires long-term planning. Moreover, construction managers play a key role in leading, planning and scheduling of a construction project. As a result, sustainability of construction projects can be affected by construction managers’ decisions. In addition, for greater development of sustainable construction, affecting factors should firstly be notified. Therefore, it seems necessary to investigate construction managers’ perception of...

  17. Effects of resource management regimes on project schedule

    NARCIS (Netherlands)

    Al-Jibouri, Saad H.S.

    2002-01-01

    This paper deals with the problem of resource scheduling within given resource constraints on a sectionalised construction project. A computer model has been developed which realistically simulates the progress of projects. A project has been selected and divided into sections whereby section

  18. Application of linear scheduling method (LSM) for nuclear power plant (NPP) construction

    International Nuclear Information System (INIS)

    Kim, Woojoong; Ryu, Dongsoo; Jung, Youngsoo

    2014-01-01

    Highlights: • Mixed use of linear scheduling method with traditional CPM is suggested for NPP. • A methodology for selecting promising areas for LSM application is proposed. • A case-study is conducted to validate the proposed LSM selection methodology. • A case-study of reducing NPP construction duration by using LSM is introduced. - Abstract: According to a forecast, global energy demand is expected to increase by 56% from 2010 to 2040 (EIA, 2013). The nuclear power plant construction market is also growing with sharper competition. In nuclear power plant construction, scheduling is one of the most important functions due to its large size and complexity. Therefore, it is crucial to incorporate the ‘distinct characteristics of construction commodities and the complex characteristics of scheduling techniques’ (Jung and Woo, 2004) when selecting appropriate schedule control methods for nuclear power plant construction. However, among various types of construction scheduling techniques, the traditional critical path method (CPM) has been used most frequently in real-world practice. In this context, the purpose of this paper is to examine the viability and effectiveness of linear scheduling method (LSM) applications for specific areas in nuclear power plant construction. In order to identify the criteria for selecting scheduling techniques, the characteristics of CPM and LSM were compared and analyzed first through a literature review. Distinct characteristics of nuclear power plant construction were then explored by using a case project in order to develop a methodology to select effective areas of LSM application to nuclear power plant construction. Finally, promising areas for actual LSM application are suggested based on the proposed evaluation criteria and the case project. Findings and practical implications are discussed for further implementation

  19. Application of linear scheduling method (LSM) for nuclear power plant (NPP) construction

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Woojoong, E-mail: minidung@nate.com [Central Research Institute, Korea Hydro and Nuclear Power Co., Ltd, Daejeon 305-343 (Korea, Republic of); Ryu, Dongsoo, E-mail: energyboy@khnp.co.kr [Central Research Institute, Korea Hydro and Nuclear Power Co., Ltd, Daejeon 305-343 (Korea, Republic of); Jung, Youngsoo, E-mail: yjung97@mju.ac.kr [College of Architecture, Myongji University, Yongin 449-728 (Korea, Republic of)

    2014-04-01

    Highlights: • Mixed use of linear scheduling method with traditional CPM is suggested for NPP. • A methodology for selecting promising areas for LSM application is proposed. • A case-study is conducted to validate the proposed LSM selection methodology. • A case-study of reducing NPP construction duration by using LSM is introduced. - Abstract: According to a forecast, global energy demand is expected to increase by 56% from 2010 to 2040 (EIA, 2013). The nuclear power plant construction market is also growing with sharper competition. In nuclear power plant construction, scheduling is one of the most important functions due to its large size and complexity. Therefore, it is crucial to incorporate the ‘distinct characteristics of construction commodities and the complex characteristics of scheduling techniques’ (Jung and Woo, 2004) when selecting appropriate schedule control methods for nuclear power plant construction. However, among various types of construction scheduling techniques, the traditional critical path method (CPM) has been used most frequently in real-world practice. In this context, the purpose of this paper is to examine the viability and effectiveness of linear scheduling method (LSM) applications for specific areas in nuclear power plant construction. In order to identify the criteria for selecting scheduling techniques, the characteristics of CPM and LSM were compared and analyzed first through a literature review. Distinct characteristics of nuclear power plant construction were then explored by using a case project in order to develop a methodology to select effective areas of LSM application to nuclear power plant construction. Finally, promising areas for actual LSM application are suggested based on the proposed evaluation criteria and the case project. Findings and practical implications are discussed for further implementation.

  20. Qinshan CANDU project open top construction method

    International Nuclear Information System (INIS)

    Petrunik, K.J.; Wittann, K.; Khan, A.; Ricciuti, R.; Ivanov, A.; Chen, S.

    2003-01-01

    The significant schedule reductions achieved on the Qinshan CANDU Project were due in large part to the incorporation of advanced construction technologies in project design and delivery. For the Qinshan Project, a number of key advantages were realized through the use of the 'Open Top' construction method. This paper discusses the Qinshan Phase III CANDU Project Open Top implementation method. The Open Top method allowed major equipment to be installed simply, via the use of a Very Heavy Lift (VHL) crane and permitted the use of large-scale modularization. The advantages of Open Top construction, such as simplified access, more flexible project scheduling, improved construction safety and quality, and reduced labours are presented. The large-scale modularization of the Reactor Building Dousing System and the Open Top installation method and advantages relative to traditional CANDU 6 construction practices are also presented. Finally, major improvements for future CANDU plant construction using the Open Top method are discussed. (author)

  1. BIM-BASED SCHEDULING OF CONSTRUCTION

    DEFF Research Database (Denmark)

    Andersson, Niclas; Büchmann-Slorup, Rolf

    2010-01-01

    The potential of BIM is generally recognized in the construction industry, but the practical application of BIM for management purposes is, however, still limited among contractors. The objective of this study is to review the current scheduling process of construction in light of BIM...... and communicate. Scheduling on the detailed level, on the other hand, follows a stipulated approach to scheduling, i.e. the Last Planner System (LPS), which is characterized by involvement of all actors in the construction phase. Thus, the major challenge when implementing BIM-based scheduling is to improve...

  2. Challenges encountered during an accelerated cogeneration plant construction and commissioning schedule

    International Nuclear Information System (INIS)

    Good, R.L.; Cox, T.P.; Vallejo, J.M.

    1988-01-01

    A decision was made in 1986 to proceed with a 110 magawatt grassroots cogeneration plant to supply the steam and electrical requirements of a large, integrated petrochemical manufacturing facility. Though some preliminary engineering had been done and long delivery equipment purchase orders had been let in the summer of 1986, detailed engineering did not commence until late October and construction until mid-December, 1986. Federal income tax consideration required that the project be in service prior to the end of 1987. This eleven month construction, commissioning, and start up schedule was achieved with 100 per cent operation occurring on December 22, 1987. Numerous challenges were met by the lean Project Team during this accelerated schedule. This paper discusses the development of: Project Team Staffing, Operator and Maintenance Staffing and Training, Commissioning Schedules and Staffing, solutions to Significant Technical Problems

  3. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  4. REVIEW ON CONSTRUCTION PROJECT MANAGEMENT SOFTWARE PRIMAVERA P6

    OpenAIRE

    Piyush Pramod Bagade* & Prof. Abhijit Bhirud

    2018-01-01

    Planning, scheduling and Resource levelling plays an important role in any construction project maybe it is construction of building or construction of road. In absence of proper planning, scheduling and resource levelling construction industry does not get profit over the project. For this purpose, proper software’s and techniques must be utilize. This paper is focussing on the advantages of Oracle Primavera P6 Software. The latest version of Primavera is P6-17. In any construction work huge...

  5. ELIMINATION OF THE DISADVANTAGES OF SCHEDULING-NETWORK PLANNING BY APPLYING THE MATRIX OF KEY PROJECT EVENTS

    OpenAIRE

    Morozenko Andrey Aleksandrovich; Krasovskiy Dmitriy Viktorovich

    2017-01-01

    The article discusses the current disadvantages of the scheduling-network planning in the management of the terms of investment-construction project. Problems associated with the construction of the schedule and the definitions of the duration of the construction project are being studied. The problems of project management for the management apparatus are shown, which consists in the absence of mechanisms for prompt response to deviations in the parameters of the scheduling-network diagram. ...

  6. Impact of modules on the ACR construction schedule

    International Nuclear Information System (INIS)

    Choy, Ed; Elgohary, Medhat; Fairclough, Neville; Yu, Stephen; Murayama, Kouichi; Miura, Jun; Kawahata, Junichi

    2003-01-01

    The ACR (Advanced CANDU Reactor), developed by Atomic Energy of Canada Ltd. (AECL), is designed with constructability considerations as a major requirement during all project phases from the concept design stage to the detail design stage. For ACR-700, a project schedule of 48 months has been developed for the nth replicated unit with a 36 month construction period duration from First Concrete to Fuel Load. AECL, recognizing the immense benefit of collective experience, is partnering with Hitachi Ltd in the development of the ACR power plant design. AECL has gained valuable experience in implementing new construction methods at the Qinshan (Phase III) twin unit CANDU 6 plant in China, and Hitachi likewise has enjoyed success in modular construction of ABWRs in Japan. Utilizing these experiences, AECL is developing the ACR nuclear steam plant (NSP) and Hitachi is developing the Turbine Building. An overall construction strategy, which builds on the success of these construction methods from the nuclear power plant developments in China and Japan, has been developed for the ACR. The overall construction strategy comprises the 'Open Top' construction technique using a Very Heavy Lift crane, parallel construction activities, with extensive modularization and prefabrication. Modules and prefabrications are major features of the ACR design, resulting in an excess of 80% of Reactor Building internal work being completed as modules or as very streamlined traditional construction. This paper reviews the ACR construction strategy and provides examples of modules and how they impact on the ACR construction schedule. In conclusion, the ACR-700 is designed using the latest, proven construction methods to achieve a 36 month construction period for the nth replicated unit. (author)

  7. Identification and assessment of risk factors affecting construction projects

    Directory of Open Access Journals (Sweden)

    Mohamed Sayed Bassiony Ahmed Abd El-Karim

    2017-08-01

    Unexpected increase in cost and delays in construction projects are caused by owner, contractor, environments, etc. in which several types of risk factors may occur concurrently. The effect of cost overrun and schedule overrun do not only influence the construction industry but the overall economy as well. Even though construction project increasing in cost and schedule has received extensive attention of researchers, but because of continuous changes and development in the field, the study considered of added value to the construction industry in Egypt, in addition to risk strategy and plan analysis. In order to meet the deadline of a project and due to the complex nature of construction projects, cost and scheduling should be flexible enough to accommodate changes without negatively affecting the overall project cost and duration. As such, the objectives of the presented research in this paper are to identify, study, and assess the effect of the factors that affect cost and time contingency. Data are collected from sixteen construction companies in Egypt. The collected data, output charts and analyses spreadsheets will be used for the development of computerized model built by the authors with identification abbreviation RIAM.

  8. Optimization of design and erection methods to minimize the construction time-schedule of EPR plants

    International Nuclear Information System (INIS)

    Pierrat, Michel; L'Huby, Yvan; Decelle, Alain

    1999-01-01

    This paper presents the results of the investigations made during the Basic Design of the EPR project (European Pressurized water Reactor) to shorten the construction schedule. A 57 months construction schedule can be reached for the first unit. The investigations concern both design and construction methods. (author)

  9. The ACR: Advanced design features for a short construction schedule

    International Nuclear Information System (INIS)

    Elgohary, M.; Fairclough, N.

    2003-01-01

    Building on the successful CANDU construction at Qinshan, the ACR-700 is designed with constructability considerations as a major requirement during all project phases from the concept design stage to the detail design stage. A project schedule of 48 months has been developed for the nth ACR unit with a 36 months construction period from First Concrete to Fuel Load. This paper describes some of the advanced design features implemented in the reactor building design in order to achieve this short construction period. These features include large volume concrete pours, prefabricated rebar, composite structures, prefabricated permanent formwork and significant modularization and prefabrication

  10. Construction scheduled delay risk assessment by using combined AHP-RII methodology for an international NPP project

    Energy Technology Data Exchange (ETDEWEB)

    Hossen, Mufazal Muhammed; Kang, Sun Koo; Kim, Jong Hyun [KEPCO International Nuclear Graduate School (KINGS), Ulsan (Korea, Republic of)

    2015-04-15

    In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs.

  11. Construction scheduled delay risk assessment by using combined AHP-RII methodology for an international NPP project

    International Nuclear Information System (INIS)

    Hossen, Mufazal Muhammed; Kang, Sun Koo; Kim, Jong Hyun

    2015-01-01

    In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs

  12. ELIMINATION OF THE DISADVANTAGES OF SCHEDULING-NETWORK PLANNING BY APPLYING THE MATRIX OF KEY PROJECT EVENTS

    Directory of Open Access Journals (Sweden)

    Morozenko Andrey Aleksandrovich

    2017-07-01

    Full Text Available The article discusses the current disadvantages of the scheduling-network planning in the management of the terms of investment-construction project. Problems associated with the construction of the schedule and the definitions of the duration of the construction project are being studied. The problems of project management for the management apparatus are shown, which consists in the absence of mechanisms for prompt response to deviations in the parameters of the scheduling-network diagram. A new approach to planning the implementation of an investment-construction project based on a matrix of key events and a rejection of the current practice of determining the duration based on inauthentic regulatory data. An algorithm for determining the key events of the project is presented. For increase the reliability of the organizational structure, the load factor of the functional block in the process of achieving the key event is proposed. Recommendations for improving the interaction of the participants in the investment-construction project are given.

  13. Modelling of project cash flow on construction projects in Malang city

    Science.gov (United States)

    Djatmiko, Bambang

    2017-09-01

    Contractors usually prepare a project cash flow (PCF) on construction projects. The flow of cash in and cash out within a construction project may vary depending on the owner, contract documents, and construction service providers who have their own authority. Other factors affecting the PCF are down payment, termyn, progress schedule, material schedule, equipment schedule, manpower schedules, and wages of workers and subcontractors. This study aims to describe the cash inflow and cash outflow based on the empirical data obtained from contractors, develop a PCF model based on Halpen & Woodhead's PCF model, and investigate whether or not there is a significant difference between the Halpen & Woodhead's PCF model and the empirical PCF model. Based on the researcher's observation, the PCF management has never been implemented by the contractors in Malang in serving their clients (owners). The research setting is in Malang City because physical development in all field and there are many new construction service providers. The findings in this current study are summarised as follows: 1) Cash in included current assets (20%), owner's down payment (20%), termyin I (5%-25%), termyin II (20%), termyin III (25%), termyin IV (25%) and retention (5%). Cash out included direct cost (65%), indirect cost (20%), and profit + informal cost(15%), 2)the construction work involving the empirical PCF model in this study was started with the funds obtained from DP or current assets and 3) The two models bear several similarities in the upward trends of direct cost, indirect cost, Pro Ic, progress billing, and S-curve. The difference between the two models is the occurrence of overdraft in the Halpen and Woodhead's PCF model only.

  14. Brokdorf nuclear power station: Construction scheduling and deadline control

    International Nuclear Information System (INIS)

    Lembcke, U.D.F.

    1986-01-01

    Scheduling, especially deadline control, for all installations of the Brokdorf nuclear power station was carried out centrally by the Project Management of Kraftwerk Union AG. 130 timetables encompassing some 13,000 activities were handled, which were interconnected and linked to 189 timetables (approx. 18,000 activities) from various specialized sections by means of data processing systems. Much space in time scheduling was taken by controls of software processing, especially of the preliminary inspection documents in the piping sector and of working documents for construction management in the control systems area. (orig.) [de

  15. Multi-objective genetic optimization of linear construction projects

    Directory of Open Access Journals (Sweden)

    Fatma A. Agrama

    2012-08-01

    Full Text Available In the real world, the majority cases of optimization problems, met by engineers, are composed of several conflicting objectives. This paper presents an approach for a multi-objective optimization model for scheduling linear construction projects. Linear construction projects have many identical units wherein activities repeat from one unit to another. Highway, pipeline, and tunnels are good examples that exhibit repetitive characteristics. These projects represent a large portion of the construction industry. The present model enables construction planners to generate optimal/near-optimal construction plans that minimize project duration, total work interruptions, and total number of crews. Each of these plans identifies, from a set of feasible alternatives, optimal crew synchronization for each activity and activity interruptions at each unit. This model satisfies the following aspects: (1 it is based on the line of balance technique; (2 it considers non-serial typical activities networks with finish–start relationship and both lag or overlap time between activities is allowed; (3 it utilizes a multi-objective genetic algorithms approach; (4 it is developed as a spreadsheet template that is easy to use. Details of the model with visual charts are presented. An application example is analyzed to illustrate the use of the model and demonstrate its capabilities in optimizing the scheduling of linear construction projects.

  16. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...... this document as an instruction set. The electronic file of your paper will be formatted further at Journal of Software. Define all symbols used in the abstract. Do not cite references in the abstract. Do not delete the blank line immediately above the abstract; it sets the footnote at the bottom of this column....

  17. Schedule Risk Analysis Of Southern Mainway Construction In Jember Regency

    Science.gov (United States)

    Susilo, K.; Wiguna, I. P. A.; Adi, T. J. W.

    2017-11-01

    In Jember Regency, it has been built Southern Cross Road (JLS) as part of regional project. On the implementation of previous construction, there were still some events which gave negative impact to the project. The purpose of this research is to analyze risk and its effect on schedule at the construction phase of JLS at Jember Regency. Risk identification process is carried out by site survey, literature studies and supporting data. The use of Probability and Impact Matrix were aimed to obtain the level of risk. Based on the analysis, it was obtained six highest risk that could affecting schedule, such as difficult access locations, heavy rains, increases of material price, broken road pavement work, change order, and work accident. Risk responses were proposed by applying agreement to guarantee stock and price of materials, prioritized drainage, and constructing bridge to solve difficult access. An intense coordination in the site, routine checks of quality, manufacturing of retailing walls were also needed to reduce possibility of distruption to pavement work. To avoid work accident, it is needed to socialize about harsh terrain condition, mutual allertness among supervisor, worker and the others, and also all personals must comply with savety rules.

  18. Construction schedule management of China Experimental Fast Reactor

    International Nuclear Information System (INIS)

    Wang Yue

    2012-01-01

    China Experimental Fast Reactor (CEFR) in the first Fast Reactor in China, which is one of large project of the National High Technology Research and Development Program ('863' Program). On 21 st July 2011, CEFR had succeeded to connect to power grid, the target of construction had come true. To a large item, schedule management is one of the most important management, this paper a overall discussion about CEFR item. It has proved that the management of CEFR project is scientific, normative and high-efficiency, it will be valuable for lager Fast Reactor item and designers in interrelated field. (author)

  19. Time Overrun in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Timely completion is the key criteria to achieve success in any project despite the industry. Unfortunately construction industry in Malaysia has been labelled as industry facing poor performance leading to failure in achieving effective time management. As the consequence most of the project face huge amount of time overrun. This study assesses the causes of construction projects time overrun in Malaysia using structured questionnaire survey. Each respondent is asked to assign a one-to-five rating for each of the 18 time factors identified from literature review. Out of the 50 questionnaires sent out, 33 were received back representing 68% of the response rate. Data received from the questionnaires were analysed and processed using the descriptive statistics procedures. Findings from the study revealed that design and documentation issues, project management and contract administration, ineffective project planning and scheduling, contractor’s site management, financial resource management were the major factors that cause the time overrun. This study is hoped to help the practitioners to implement the mitigation measure at planning stage in order to achieve successful construction projects.

  20. Cost/schedule performance measurement system utilized on the Fast Flux Test Facility project

    International Nuclear Information System (INIS)

    Brown, R.K.; Frost, R.A.; Zimmerman, F.M.

    1976-01-01

    An Earned Value-Integrated Cost/Schedule Performance Measurement System has been applied to a major nonmilitary nuclear design and construction project. This system is similar to the Department of Defense Cost/Schedule Performance Measurement System. The project is the Fast Flux Test Facility (a Fuels and Materials test reactor for the Liquid Metal Fast Breeder Reactor Program) being built at the Hanford Engineering Development Laboratory, Richland, Washington, by Westinghouse Hanford Company for the U. S. Energy Research and Development Administration. Because the project was well into the construction phase when the Earned Value System was being considered, it was decided that the principles of DOD's Cost/Schedule Control System Criteria would be applied to the extent possible but no major changes in accounting practices or management systems were imposed. Implementation of this system enabled the following questions to be answered: For work performed, how do actual costs compare with the budget for that work. What is the impact of cost and schedule variances at an overall project level composed of different kinds of activities. Without the Earned Value system, these questions could be answered in a qualitative, subjective manner at best

  1. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  2. KASS v.2.2. scheduling software for construction

    OpenAIRE

    Krzemiński Michał

    2016-01-01

    The paper presents fourth version of specialist useful software in scheduling KASS v.2.2 (Algorithm Scheduling Krzeminski System). KASS software is designed for construction scheduling, specially form flow shop models. The program is being dedicated closely for the purposes of the construction. In distinguishing to other used programs in tasks of this type operational research criteria were designed closely with the thought about construction works and about the specificity of the building pr...

  3. A study for EVMS application to NPP construction project

    Energy Technology Data Exchange (ETDEWEB)

    Roh, M. S.; Kwak, J. K. [KEPCO, Daejeon (Korea, Republic of)

    2016-05-15

    The earned value project management method integrates three critical elements of project management scope management, cost management and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments, and allows calculation of cost and schedule variances along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. It is also anticipated that there will be intense competition in the nuclear industry as the cost and time for nuclear power plant construction. In order to attain competitive advantages under the globalized market, utilizing advanced project control systems by integrating cost and time management is of great concern for practitioners as well as the researchers. In this context, the purpose of this paper is to identify major previously improving activities that characterize the real-world Earned Value Management System (EVMS) implementation for nuclear power plant construction. And several distinct attributes of nuclear power plant construction were also investigated.

  4. A study for EVMS application to NPP construction project

    International Nuclear Information System (INIS)

    Roh, M. S.; Kwak, J. K.

    2016-01-01

    The earned value project management method integrates three critical elements of project management scope management, cost management and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments, and allows calculation of cost and schedule variances along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. It is also anticipated that there will be intense competition in the nuclear industry as the cost and time for nuclear power plant construction. In order to attain competitive advantages under the globalized market, utilizing advanced project control systems by integrating cost and time management is of great concern for practitioners as well as the researchers. In this context, the purpose of this paper is to identify major previously improving activities that characterize the real-world Earned Value Management System (EVMS) implementation for nuclear power plant construction. And several distinct attributes of nuclear power plant construction were also investigated

  5. Project scheduling method with time using MRP system – A case study: Construction project in Libya

    Directory of Open Access Journals (Sweden)

    Abdallah Ali Imetieg

    2015-04-01

    Full Text Available Materials Requirements and Planning (MRP is a system of production planning and inventory control, which is used to manage manufacturing processes. Most MRP systems are software-based and are used to ensure that the materials are available for production, that the products are available for delivery to customers, that the lowest possible material and product level is maintained in store, as well as to plan delivery schedules and purchasing activities. Upon completion of scheduling, begins the process of follow-up, which includes the achievement of the project goals in terms of quantity, quality and costs in accordance with deadlines. MRP system was applied to project of 5000 housing units in Solug area, which is close to Benghazi city, Libya, with the aim to provide necessary cash flow to pay dues on time without delay to all involved project sub-contractors and material suppliers, to ensure the smooth flow of operations, as well as to diminish costs by reduction of temporary storages and rented areas. There is a correlation between time and cost of each activity. If the required time is shorter than the scheduled time of the certain activity, it would demand more resources, which further leads to the increase in direct costs of the given activity. Therefore, the output of MRP is important since commands are issued through planning in order to launch the suggested orders with the required quantities and within the limited time period.

  6. ALGORITHMIC CONSTRUCTION SCHEDULES IN CONDITIONS OF TIMING CONSTRAINTS

    Directory of Open Access Journals (Sweden)

    Alexey S. Dobrynin

    2014-01-01

    Full Text Available Tasks of time-schedule construction (JSSP in various fields of human activities have an important theoretical and practical significance. The main feature of these tasks is a timing requirement, describing allowed planning time periods and periods of downtime. This article describes implementation variations of the work scheduling algorithm under timing requirements for the tasks of industrial time-schedules construction, and service activities.

  7. Mathematical programming and financial objectives for scheduling projects

    CERN Document Server

    Kimms, Alf

    2001-01-01

    Mathematical Programming and Financial Objectives for Scheduling Projects focuses on decision problems where the performance is measured in terms of money. As the title suggests, special attention is paid to financial objectives and the relationship of financial objectives to project schedules and scheduling. In addition, how schedules relate to other decisions is treated in detail. The book demonstrates that scheduling must be combined with project selection and financing, and that scheduling helps to give an answer to the planning issue of the amount of resources required for a project. The author makes clear the relevance of scheduling to cutting budget costs. The book is divided into six parts. The first part gives a brief introduction to project management. Part two examines scheduling projects in order to maximize their net present value. Part three considers capital rationing. Many decisions on selecting or rejecting a project cannot be made in isolation and multiple projects must be taken fully into a...

  8. Integrated Cost and Schedule Control Systems for Nuclear Power Plant Construction: Leveraging Strategic Advantages to Owners and EPC Firms

    Directory of Open Access Journals (Sweden)

    Youngsoo Jung

    2015-01-01

    Full Text Available As the owners expect that the cost and time for nuclear power plant construction would decrease with new entrants into the market, there will be severer competition in the nuclear industry. In order to achieve performance improvement and to attain competitive advantages under the globalized competition, practitioners and researchers in the nuclear industry have recently exerted efforts to develop an advanced and efficient management methodology for the nuclear mega-projects. Among several candidates, integrated cost and schedule control system is of great concern because it can effectively manage the three most important project performances including cost, time, and quality. In this context, the purpose of this paper is to develop a project numbering system (PNS of integrated cost and schedule control system for nuclear power plant construction. Distinct attributes of nuclear power plant construction were investigated first in order to identify influencing variables that characterize real-world implementation of advanced cost and schedule controls. A scenario was then developed and analysed to simulate a case-project. By using this case-project, proposed management requirements, management methods, measurement techniques, data structure, and data collection methods for integrated cost and schedule PNS were illustrated. Finally, findings and implications are outlined, and recommendations for further research are presented.

  9. Project schedule and cost estimate report

    International Nuclear Information System (INIS)

    1988-03-01

    All cost tables represent obligation dollars, at both a constant FY 1987 level and an estimated escalation level, and are based on the FY 1989 DOE Congressional Budget submittal of December 1987. The cost tables display the total UMTRA Project estimated costs, which include both Federal and state funding. The Total Estimated Cost (TEC) for the UMTRA Project is approximately $992.5 million (in 1987 escalated dollars). Project schedules have been developed that provide for Project completion by September 1994, subject to Congressional approval extending DOE's authorization under Public Law 95-604. The report contains site-specific demographic data, conceptual design assumptions, preliminary cost estimates, and site schedules. A general project overview is also presented, which includes a discussion of the basis for the schedule and cost estimates, contingency assumptions, work breakdown structure, and potential project risks. The schedules and cost estimates will be revised as necessary to reflect appropriate decisions relating to relocation of certain tailings piles, or other special design considerations or circumstances (such as revised EPA groundwater standards), and changes in the Project mission. 27 figs', 97 tabs

  10. Study on modular construction management in AP1000 nuclear plant project

    International Nuclear Information System (INIS)

    Fang Xiaopeng; Shen Wenrong; Sun Kebin; Wei Zhong

    2010-01-01

    The construction of AP1000 Nuclear Power Plant (NPP) has commenced in China. The AP1000 NPP features a passive design concept and modular construction technology. Based on the management of the construction of current AP1000 NNP, this paper describes the effects on Nuclear Island (NI) construction project management resulting from modular construction technology, as well as new construction techniques and methods. This paper puts forward new requirements for construction schedule management of the nuclear island construction at different levels. The AP1000 NI construction logic features the parallel construction of civil and structural erection as the main approach, with the integrated schedule of module fabrication, assembly and installation as support. The structural modules of AP1000 project are prefabricated in shop, delivered to site as sub-modules and assembled to integrated structural module. The assembled module is transported to the construction site, hoisted and finally set in NI. This paper illustrates how to ensure the construction quality of structural modules by analyzing the interface process and key links in the quality control program, and introduces how to ensure the safety of heavy structural components during various construction phases by evaluating and analyzing the construction safety process. This paper also makes an analysis of the safe environment for the assembly and installation of Containment Vessel, the management of product protection and personnel safety inside the Containment Building during 'Open Top' construction, raises to implement effective protection for the numerous pre-set mechanical modules and equipments, as well as personnel safety protection programs and measures. The modular construction feature of AP1000 NPP design requires technique improvement and management innovation during the NI construction. This paper makes a study and research on the control management of schedule, quality and safety of AP1000 NPP NI

  11. Where do we stand with fuzzy project scheduling?

    CERN Document Server

    Bonnal, Pierre; Lacoste, Germain

    2004-01-01

    Fuzzy project scheduling has interested several researchers in the past two decades; about 20 articles have been written on this issue. Contrary to stochastic project-scheduling approaches that are used by many project schedulers, and even if the axiomatic associated to the theory of probabilities is not always compatible with decision-making situations, fuzzy project-scheduling approaches that are most suited to these situations have been kept in the academic sphere. This paper starts by recalling the differences one can observe between uncertainty and imprecision. Then most of the published research works that have been done in this field are summarized. Finally, a framework for addressing the resource-constrained fuzzy project- scheduling problem is proposed. This framework uses temporal linguistic descriptors, which might become very interesting features to the project-scheduling practitioners.

  12. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    International Nuclear Information System (INIS)

    Lee, Kwang Ho; Roh, Myung Sub

    2013-01-01

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors

  13. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kwang Ho; Roh, Myung Sub [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2013-10-15

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors.

  14. Construction schedules slack time minimizing

    Science.gov (United States)

    Krzemiński, Michał

    2017-07-01

    The article presents two copyright models for minimizing downtime working brigades. Models have been developed for construction schedules performed using the method of work uniform. Application of flow shop models is possible and useful for the implementation of large objects, which can be divided into plots. The article also presents a condition describing gives which model should be used, as well as a brief example of optimization schedule. The optimization results confirm the legitimacy of the work on the newly-developed models.

  15. Integrated multi-resource planning and scheduling in engineering project

    Directory of Open Access Journals (Sweden)

    Samer Ben Issa

    2017-01-01

    Full Text Available Planning and scheduling processes in project management are carried out sequentially in prac-tice, i.e. planning project activities first without visibility of resource limitation, and then schedul-ing the project according to these pre-planned activities. This is a need to integrate these two pro-cesses. In this paper, we use Branch and Bound approach for generating all the feasible and non-feasible project schedules with/without activity splitting, and with a new criterion called “the Minimum Moments of Resources Required around X-Y axes (MMORR”, we select the best feasible project schedule to integrate plan processing and schedule processing for engineering projects. The results illustrate that this integrated approach can effectively select the best feasible project schedule among alternatives, improves the resource utilization, and shortens the project lead time.

  16. Project planning and management techniques of the fast-paced TMX-Upgrade construction

    International Nuclear Information System (INIS)

    Seberger, C.D.; Chargin, A.K.

    1981-01-01

    The Tandem Mirror Experiment-Upgrade (TMX-Upgrade) construction will be completed in 18 months at a total cost of $14.5 million. This paper describes the project planning and the management techniques used to complete the TMX-Upgrade within its allocated cost and schedule. In the planning stages of a project, before approval of the proposal, we define major project objectives, create a work breakdown structure (WBS), detail a technical description for each level of the WBS, and provide detailed bottoms-up cost estimates and summary schedules. In the operating phase, which continues throughout the project, we establish budget and schedule baselines. The reporting phase includes The Department of Energy (DOE) reviews of project status at monthly, quarterly, and semiannual intervals. These reports include cost, schedule, manpower, major procurement, and technical status information

  17. Application Of The Work Breakdown Structure In Determining Cost Buffers In Construction Schedules

    Directory of Open Access Journals (Sweden)

    Połoński M.

    2015-03-01

    Full Text Available The paper presents methods of determining the location of cost buffers and corresponding contingency costs in the CPM schedule based on its work breakdown structure. Application of correctly located cost buffers with appropriately established reserve costs is justified by the common overrunning of scheduled costs in construction projects. Interpolated cost buffers (CB as separate tasks have been combined with relevant summary tasks by the start–to–start (SS relationship, whereas the time of their execution has been dynamically connected with the time of accomplishment of particular summary tasks using the “paste connection” option. Besides cost buffers linked with the group of tasks assigned to summary tasks, a definition of the cost buffer for the entire project (PCB has been proposed, i.e. as one initial task of the entire project. Contingency costs corresponding to these buffers, depending on the data that the planner has at his disposal, can be determined using different methods, but always depend on the costs of all tasks protected by each buffer. The paper presents an exemplary schedule for a facility and the method of determining locations and cost for buffers CB and PCB, as well as their influence on the course of the curve illustrating the budgeted cost of work scheduled (BCWS. The proposed solution has been adjusted and presented with consideration of the possibilities created by the scheduling software MS Project, though its general assumptions may be implemented with application of other similar specialist tools.

  18. Scheduling of resource-constrained projects

    CERN Document Server

    Klein, Robert

    2000-01-01

    Project management has become a widespread instrument enabling organizations to efficiently master the challenges of steadily shortening product life cycles, global markets and decreasing profit margins. With projects increasing in size and complexity, their planning and control represents one of the most crucial management tasks. This is especially true for scheduling, which is concerned with establishing execution dates for the sub-activities to be performed in order to complete the project. The ability to manage projects where resources must be allocated between concurrent projects or even sub-activities of a single project requires the use of commercial project management software packages. However, the results yielded by the solution procedures included are often rather unsatisfactory. Scheduling of Resource-Constrained Projects develops more efficient procedures, which can easily be integrated into software packages by incorporated programming languages, and thus should be of great interest for practiti...

  19. Distributed Research Project Scheduling Based on Multi-Agent Methods

    Directory of Open Access Journals (Sweden)

    Constanta Nicoleta Bodea

    2011-01-01

    Full Text Available Different project planning and scheduling approaches have been developed. The Operational Research (OR provides two major planning techniques: CPM (Critical Path Method and PERT (Program Evaluation and Review Technique. Due to projects complexity and difficulty to use classical methods, new approaches were developed. Artificial Intelligence (AI initially promoted the automatic planner concept, but model-based planning and scheduling methods emerged later on. The paper adresses the project scheduling optimization problem, when projects are seen as Complex Adaptive Systems (CAS. Taken into consideration two different approaches for project scheduling optimization: TCPSP (Time- Constrained Project Scheduling and RCPSP (Resource-Constrained Project Scheduling, the paper focuses on a multiagent implementation in MATLAB for TCSP. Using the research project as a case study, the paper includes a comparison between two multi-agent methods: Genetic Algorithm (GA and Ant Colony Algorithm (ACO.

  20. Influential Factors Affecting Materials Management in Construction Projects

    Directory of Open Access Journals (Sweden)

    Jusoh Zairra Mat

    2017-12-01

    Full Text Available Construction projects are more often than not plagued by poor performances such as delays, cost overrun, low productivity, construction wastes and compromised quality. Amongst the critical contributory factors of poor project performances, is the ineffectiveness of materials management occurring in the construction sites. Indeed, materials management is a very important component for construction projects. However, there are only limited numbers of research available regarding this topic. Thus, this research focuses its study on materials management, specifically in identifying the influential factors that affect materials management in the construction project activities. Literatures from books, journal articles and conference papers related to poor project performances and materials management have been reviewed. Consequently, this study sorted the salient influential factors and categorized them based on their specific group. Out of 47 factors identified, they are classified into 8 groups. They are (1 site condition; (2 planning and handling on site; (3 management; (4 materials; (5 supplier and manufacturer default; (6 transportation; (7 contractual; and (8 governmental interferences. In conclusion, this study contends that by identifying the influential factors affecting materials management, it will help construction players to avoid the occurrence of those factors and will minimize the negative impacts on the overall performance of construction projects. Hence, the handling-over of project will be according to schedule and not delayed by materials mismanagement.

  1. Project Scheduling Based on Risk of Gas Transmission Pipe

    Science.gov (United States)

    Silvianita; Nurbaity, A.; Mulyadi, Y.; Suntoyo; Chamelia, D. M.

    2018-03-01

    The planning of a project has a time limit on which must be completed before or right at a predetermined time. Thus, in a project planning, it is necessary to have scheduling management that is useful for completing a project to achieve maximum results by considering the constraints that will exists. Scheduling management is undertaken to deal with uncertainties and negative impacts of time and cost in project completion. This paper explains about scheduling management in gas transmission pipeline project Gresik-Semarang to find out which scheduling plan is most effectively used in accordance with its risk value. Scheduling management in this paper is assissted by Microsoft Project software to find the critical path of existing project scheduling planning data. Critical path is the longest scheduling path with the fastest completion time. The result is found a critical path on project scheduling with completion time is 152 days. Furthermore, the calculation of risk is done by using House of Risk (HOR) method and it is found that the critical path has a share of 40.98 percent of all causes of the occurence of risk events that will be experienced.

  2. Determinants of construction project success in India

    CERN Document Server

    Jha, Kumar Neeraj

    2013-01-01

    This study presents exploratory work and seeks to identify and evaluate the success and failure factors that could form a guideline for further study and to some extent help professionals to understand some critical aspects that impact project performance concerning construction in India. A total of 55 attributes affecting the performance of construction projects are analysed in terms of their level of influence on four key performance criteria – schedule, cost, quality, and no disputes – using a two-stage questionnaire survey. These attributes are then further analysed, interpreted and evaluated.   Based on the critical success factors obtained from the study, a neural network model-based predictive model for project performance has been developed. The performance prediction models have been derived for all four project performance criteria. Further, a hypothesis that ‘project success’ is influenced by ‘success traits’ has also been formulated. The hypothesized positive inter-relationships betwe...

  3. AP1000 construction schedule

    International Nuclear Information System (INIS)

    Winters, J.W.

    2001-01-01

    Westinghouse performed this study as part of EPRI interest in advancing the use of computer aided processes to reduce the cost of nuclear power plants. EPRI believed that if one could relate appropriate portions of an advanced light water reactor plant model to activities in its construction sequence, and this relationship could be portrayed visually, then optimization of the construction sequence could be developed as never before. By seeing a 3-D representation of the plant at any point in its construction sequence, more informed decisions can be made on the feasibility or attractiveness of follow on or parallel steps in the sequence. The 3-D representation of construction as a function of time (4-D) could also increase the confidence of potential investors concerning the viability of the schedule and the plant ultimate cost. This study performed by Westinghouse confirmed that it is useful to be able to visualize a plant construction in 3-D as a function of time in order to optimize the sequence of construction activities. (author)

  4. Understanding the costs and schedule of hydroelectric projects

    International Nuclear Information System (INIS)

    Merrow, E.W.; Schroeder, B.R.

    1991-01-01

    This paper is based on a study conducted for the World Bank which evaluated the feasibility of developing an empirically based ex ante project analysis system for hydroelectric projects. The system would be used to assess: the reasonableness of engineering-based cost and schedule estimates used for project appraisal and preliminary estimates used to select projects for appraisal; and the potential for cost growth and schedule slip. The system would help identify projects early in the project appraisal process that harbor significantly higher than normal risks of overrunning cost and schedule estimates

  5. Scheduling projects with multiskill learning effect.

    Science.gov (United States)

    Zha, Hong; Zhang, Lianying

    2014-01-01

    We investigate the project scheduling problem with multiskill learning effect. A new model is proposed to deal with the problem, where both autonomous and induced learning are considered. In order to obtain the optimal solution, a genetic algorithm with specific encoding and decoding schemes is introduced. A numerical example is used to illustrate the proposed model. The computational results show that the learning effect cannot be neglected in project scheduling. By means of determining the level of induced learning, the project manager can balance the project makespan with total cost.

  6. Conception of Self-Construction Production Scheduling System

    Science.gov (United States)

    Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru

    With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

  7. Optimal Scheduling of Railway Track Possessions in Large-Scale Projects with Multiple Construction Works

    DEFF Research Database (Denmark)

    Li, Rui; Roberti, Roberto

    2017-01-01

    satisfying different operational constraints and minimizing the total construction cost. To find an optimal solution of the RTPSP, this paper proposes an approach that, first, transfers the nominal market prices into track-possession-based real prices, and then generates a schedule of the construction works...... by solving a mixed-integer linear-programming model for the given track blocking proposal. The proposed approach is tested on a real-life case study from the Danish railway infrastructure manager. The results show that, in 2 h of computing time, the approach is able to provide solutions that are within 0...

  8. A status report on the PBFA II construction project

    International Nuclear Information System (INIS)

    Barr, G.W.; Furaus, J.P.; Cook, D.L.; Shirley, C.G.

    1985-01-01

    The Particle Beam Fusion Accelerator II (PBFA II) is under construction at Sandia National Laboratories (SNL). PBFA II contains 36 individual power modules configured in a stacked radial geometry and synchronized to provide greater than 3.5 MJ of energy into the vacuum section in a single 55-ns-wide 90-TW peak power pulse. This R and D construction project is being implemented in a fast track schedule mode in which final design of the accelerator components occurs in parallel with the construction of the laboratory building and the accelerator tank. PBFA II is scheduled to become operational in January 1986 with its first multi-module shot into an applied-B ion diode that will generate and transport a beam of lithium ions. Plans are now being made for experimental work on PBFA II beyond the construction phase

  9. Solving project scheduling problems by minimum cut computations

    NARCIS (Netherlands)

    Möhring, R.H.; Schulz, A.S.; Stork, F.; Uetz, Marc Jochen

    In project scheduling, a set of precedence-constrained jobs has to be scheduled so as to minimize a given objective. In resource-constrained project scheduling, the jobs additionally compete for scarce resources. Due to its universality, the latter problem has a variety of applications in

  10. Organization of the construction and schedule of realization

    International Nuclear Information System (INIS)

    Szerovay, Antal; Vogel, Oszkar

    1988-01-01

    The four units of the Paks nuclear power plant with all the auxiliary and service facilities were constructed between 1974 and 1987. Major features of building activities, types of buildings classified according to the connection between the facility and the technology are listed. Processes and structures applied to the construction of the main reactor building are mentioned emphasizing the importance of up-to-date building methods. To move the large equipment into the reactor building Potain cranes of 400 Mp were used. As a result of adequate schedule the auxiliary buildings could be used as preparatory buildings during the construction of the plant. The energy and material supply, the schedule of the construction works are discussed. (V.N.) 6 refs.; 5 figs

  11. Applications and Prospects of Modularization Technology in HTR Project Starting from Primary Loop Cavity Construction

    International Nuclear Information System (INIS)

    Yang Guokang; Chen Jing; Huang Wen; Lin Lizhi; Sun Yunlun; Chen Yan; Mao Jiaxin; Wang Yougang; Wang Jinwen; Lin Mingfeng; Yang Mingshan

    2014-01-01

    Primary loop cavity is one of the key areas and major difficulties in HTR-PM project construction. In order to shorten the construction schedule and improve the construction quality, researches on modular design and construction of primary loop cavity has been carried out and the results have been applied in HTR-PM project construction, and got significant application benefit. This paper summarizes the modularization technology application research and project implementation results of primary loop cavity, and analyzes the application and prospects of modularization technology in the HTR project construction. (author)

  12. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    International Nuclear Information System (INIS)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs

  13. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs.

  14. Development of Earned Value Management System in PP Construction Project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sang-Hyun; Moon, Byeong-Suk [KHNP-CRI, Daejeon (Korea, Republic of)

    2014-10-15

    The NPP construction project has been determined in the form of a rather lump-sum contract with little details in resource requirements and estimations. Therefore, Earned Value Management System (EVMS) needs to be applied to the NPP projects in order to incorporate scope, schedule and cost targeting efficient and to control effective resource. The NPP projects in Korea have not applied EVMS. EVMS has phased in NPP construction project by Korea Hydro and Nuclear Power Co., Ltd (KHNP), playing the role of project master manager in NPP construction in Korea. This study presented the EVMS unlike other system. Accordingly, EVMS is expected to reduce risks and increase efficiency in the NPP project. The NPP construction project is a technology ntensive multi-construction project that should be based on economics and stability and that takes over ten years to complete, requiring investment of billions of dollars, a great number of persons concerned, and a vast store of human and material resources. KHNP is phasing EVMS in NPP construction project for overseas contracts and the efficient management, the paper presented the pilot EVMS in KHNP. It expected to control and identify of NPP construction projects by using EVMS as a computerized management tool which is quantitative and objective management criteria. It is necessary to improve of the contract system related EVM for enterprise system, and the effort will be required, such as on-site support and training so that this can be done in collaboration with the relevant stakeholders.

  15. The application of micro UAV in construction project

    Science.gov (United States)

    Kaamin, Masiri; Razali, Siti Nooraiin Mohd; Ahmad, Nor Farah Atiqah; Bukari, Saifullizan Mohd; Ngadiman, Norhayati; Kadir, Aslila Abd; Hamid, Nor Baizura

    2017-10-01

    In every outstanding construction project, there is definitely have an effective construction management. Construction management allows a construction project to be implemented according to plan. Every construction project must have a progress development works that is usually created by the site engineer. Documenting the progress of works is one of the requirements in construction management. In a progress report it is necessarily have a visual image as an evidence. The conventional method used for photographing on the construction site is by using common digital camera which is has few setback comparing to Micro Unmanned Aerial Vehicles (UAV). Besides, site engineer always have a current issues involving limitation of monitoring on high reach point and entire view of the construction site. The purpose of this paper is to provide a concise review of Micro UAV technology in monitoring the progress on construction site through visualization approach. The aims of this study are to replace the conventional method of photographing on construction site using Micro UAV which can portray the whole view of the building, especially on high reach point and allows to produce better images, videos and 3D model and also facilitating site engineer to monitor works in progress. The Micro UAV was flown around the building construction according to the Ground Control Points (GCPs) to capture images and record videos. The images taken from Micro UAV have been processed generate 3D model and were analysed to visualize the building construction as well as monitoring the construction progress work and provides immediate reliable data for project estimation. It has been proven that by using Micro UAV, a better images and videos can give a better overview of the construction site and monitor any defects on high reach point building structures. Not to be forgotten, with Micro UAV the construction site progress is more efficiently tracked and kept on the schedule.

  16. THE THEORETIC-METHODOLOGICAL TOOLS OF EFFECTIVE ESTIMATION OF ORGANIZATION TECHNOLOGICAL SOLUTIONS OF CONSTRUCTION PROJECT

    Directory of Open Access Journals (Sweden)

    E. Yu. Antipenko

    2010-03-01

    Full Text Available In the article the structural analysis of efficiency indices elements of organization-and-technology solutions of construction project scheduling is executed for preparation of high-quality base of providing the planning processes and subsequent realization of the projects.

  17. Engineering schedule control of nuclear power project planning and management

    International Nuclear Information System (INIS)

    Meng Hao

    2014-01-01

    Nuclear power design is the important part of project management of nuclear power project, it is the way to control the project organization, design schedule, design progress, design quality and cost control. The good schedule system and control is the key to the success for the project. It is also analyzed the problem during the project, by using some theory and analyze the project structure, design schedule management, IED and document management and interface management propose some new idea for better improve the design management to finally better improve the management quality and efficiency. (author)

  18. A Proactive Approach for Change Management and Control on Construction Projects

    OpenAIRE

    CHEN, CHAO

    2015-01-01

    Changes on construction projects present tough and controversial issues. Change is one of the primary reasons for schedule delay and cost overrun, which create negative impact on project performance and profitability. The liability of change and its consequences are major sources of disagreements between project participants, which often lead to disputes or claims.To answer the challenge of change, both industry and academia have developed change management techniques. Many studies have touch...

  19. Minimizing Project Cost by Integrating Subcontractor Selection Decisions with Scheduling

    Science.gov (United States)

    Biruk, Sławomir; Jaśkowski, Piotr; Czarnigowska, Agata

    2017-10-01

    Subcontracting has been a worldwide practice in the construction industry. It enables the construction enterprises to focus on their core competences and, at the same time, it makes complex project possible to be delivered. Since general contractors bear full responsibility for the works carried out by their subcontractors, it is their task and their risk to select a right subcontractor for a particular work. Although subcontractor management has been admitted to significantly affect the construction project’s performance, current practices and past research deal with subcontractor management and scheduling separately. The proposed model aims to support subcontracting decisions by integrating subcontractor selection with scheduling to enable the general contractor to select the optimal combination of subcontractors and own crews for all work packages of the project. The model allows for the interactions between the subcontractors and their impacts on the overall project performance in terms of cost and, indirectly, time and quality. The model is intended to be used at the general contractor’s bid preparation stage. The authors claim that the subcontracting decisions should be taken in a two-stage process. The first stage is a prequalification - provision of a short list of capable and reliable subcontractors; this stage is not the focus of the paper. The resulting pool of available resources is divided into two subsets: subcontractors, and general contractor’s in-house crews. Once it has been defined, the next stage is to assign them to the work packages that, bound by fixed precedence constraints, form the project’s network diagram. Each package is possible to be delivered by the general contractor’s crew or some of the potential subcontractors, at a specific time and cost. Particular crews and subcontractors can be contracted more than one package, but not at the same time. Other constraints include the predefined project completion date (the project is

  20. KASS v.2.2. scheduling software for construction

    Directory of Open Access Journals (Sweden)

    Krzemiński Michał

    2016-01-01

    Full Text Available The paper presents fourth version of specialist useful software in scheduling KASS v.2.2 (Algorithm Scheduling Krzeminski System. KASS software is designed for construction scheduling, specially form flow shop models. The program is being dedicated closely for the purposes of the construction. In distinguishing to other used programs in tasks of this type operational research criteria were designed closely with the thought about construction works and about the specificity of the building production. The minimal time, the minimal slack of brigades, the minimal slacks of the chosen working brigade and costs of the transfer operation of working fronts are included in operational research criteria between work centers. It is possible to enter data into the program both by hand as well as to load the Excel from files, similarly is with results, they are presented on-screen as well as a possibility of enrolling them in the file exists Excel. An element is very valid for it since allows for further simple processing of received results. In providing software for performing operational research calculations a technique of the complete review and simulation technology are being exploited. Described algorithms a program is using which will stay in the article as well as shown computational examples will remain.

  1. Study of Collaborative Management for Transportation Construction Project Based on BIM Technology

    Science.gov (United States)

    Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng

    2018-03-01

    Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.

  2. Delays in Building Construction Projects in Ghana

    Directory of Open Access Journals (Sweden)

    Adwoa B Agyakwah-Baah

    2010-07-01

    Full Text Available This study investigates the causes of delay of building construction projects in Ghana to determine the most important according to the key project participants; clients, consultants, and contractors. Thirty-two possible causes of delay were identified from the literature and semi-structured interviews of 15 key players in the implementation process. These delay factors were further categorised into nine major groups. The list of delay causes was subjected to a questionnaire survey for the identification of the most important causes of delay. The field survey included 130 respondents made up of 39 contractors, 37 clients and 54 consultants. The relative importance of the individual causes and the groups were calculated and ranked by their relative importance index. The overall results of the study indicate that the respondents generally agree that financial group factors ranked highest among the major factors causing delay in construction projects in Ghana. The financial group factors were delay in honouring payment certificates, difficulty in accessing credit and fluctuation in prices. Materials group factors are second followed by scheduling and controlling factors.

  3. A study of the planned value estimation method for developing earned value management system in the nuclear power plant construction project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, S.H.; Moon, B.S., E-mail: gustblast@khnp.co.kr, E-mail: moonbs@khnp.co.kr [Korea Hydro & Nuclear power co.,Ltd., Central Research Inst., Daejeon (Korea, Republic of); Lee, J.H., E-mail: ljh@kkprotech.com [Kong Kwan Protech Co.,Ltd., Seoul (Korea, Republic of)

    2014-07-01

    The Earned Value Management System (EVMS) is a project management technique for measuring project performance and progress, and then forward projection through the integrated management and control of cost and schedule. This research reviewed the concept of the EVMS method, and proposes two Planned Value estimation methods for the potential application to succeeding NPP construction projects by using the historical data from the proceeding NPP projects. This paper is to introduce the solution for the problems caused by the absence of relevant management system incorporating schedule and cost, which has arisen as repeated issues in NPP construction project management. (author)

  4. A study of the planned value estimation method for developing earned value management system in the nuclear power plant construction project

    International Nuclear Information System (INIS)

    Lee, S.H.; Moon, B.S.; Lee, J.H.

    2014-01-01

    The Earned Value Management System (EVMS) is a project management technique for measuring project performance and progress, and then forward projection through the integrated management and control of cost and schedule. This research reviewed the concept of the EVMS method, and proposes two Planned Value estimation methods for the potential application to succeeding NPP construction projects by using the historical data from the proceeding NPP projects. This paper is to introduce the solution for the problems caused by the absence of relevant management system incorporating schedule and cost, which has arisen as repeated issues in NPP construction project management. (author)

  5. Algorithm of composing the schedule of construction and installation works

    Science.gov (United States)

    Nehaj, Rustam; Molotkov, Georgij; Rudchenko, Ivan; Grinev, Anatolij; Sekisov, Aleksandr

    2017-10-01

    An algorithm for scheduling works is developed, in which the priority of the work corresponds to the total weight of the subordinate works, the vertices of the graph, and it is proved that for graphs of the tree type the algorithm is optimal. An algorithm is synthesized to reduce the search for solutions when drawing up schedules of construction and installation works, allocating a subset with the optimal solution of the problem of the minimum power, which is determined by the structure of its initial data and numerical values. An algorithm for scheduling construction and installation work is developed, taking into account the schedule for the movement of brigades, which is characterized by the possibility to efficiently calculate the values of minimizing the time of work performance by the parameters of organizational and technological reliability through the use of the branch and boundary method. The program of the computational algorithm was compiled in the MatLAB-2008 program. For the initial data of the matrix, random numbers were taken, uniformly distributed in the range from 1 to 100. It takes 0.5; 2.5; 7.5; 27 minutes to solve the problem. Thus, the proposed method for estimating the lower boundary of the solution is sufficiently accurate and allows efficient solution of the minimax task of scheduling construction and installation works.

  6. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    International Nuclear Information System (INIS)

    Ferguson Jones, Andrea; Lee, Angela; Palmeter, Tim

    2013-01-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

  7. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    Energy Technology Data Exchange (ETDEWEB)

    Ferguson Jones, Andrea; Lee, Angela [MMM Group Limited, 100 Commerce Valley Drive West, Thornhill, Ontario, L3T 0A1 (Canada); Palmeter, Tim [Public Works and Government Services Canada, 4900 Yonge Street, Toronto, Ontario, M2N 6A6 (Canada)

    2013-07-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

  8. Resource allocation in IT projects: using schedule optimization

    Directory of Open Access Journals (Sweden)

    Michael Chilton

    2014-01-01

    Full Text Available Resource allocation is the process of assigning resources to tasks throughout the life of a project. Despite sophisticated software packages devoted to keeping track of tasks, resources and resource assignments, it is often the case that project managers find some resources over-allocated and therefore unable to complete the assigned work in the allotted amount of time. Most scheduling software has provisions for leveling resources, but the techniques for doing so simply add time to the schedule and may cause delays in tasks that are critical to the project in meeting deadlines. This paper presents a software application that ensures that resources are properly balanced at the beginning of the project and eliminates the situation in which resources become over-allocated. It can be used in a multi-project environment and reused throughout the project as tasks, resource assignments and availability, and the project scope change. The application utilizes the bounded enumeration technique to formulate an optimal schedule for which both the task sequence and resource availability are taken into account. It is run on a database server to reduce the running time and make it a viable application for practitioners.

  9. Prioritization of Delay Factors for NPP Construction Risk in International Project by Using AHP Methodology

    Energy Technology Data Exchange (ETDEWEB)

    Hossen, Muhammed Mufazzal; Kang, Sunkoo; Kim, Jonghyun [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2014-10-15

    It is crucial for the nuclear power plant project decision makers and management personnel to identify the actual factors of construction delay and their ranking in order to take preventive actions. NPP project is complex in nature and the construction phase is one of the most key phase which is subject to many factors result from many sources. From experience, nuclear projects have faced challenges similar to other complex mega projects with additional nuclear specific issues and life time cost of nuclear reactor is concentrated upfront as capital cost, and therefore delays in construction may become intolerable in terms of both lost revenues and interest on the capital. Budget over-runs and delays on next generation new build nuclear projects in recent years clearly demonstrate that the nuclear industry continues to repeat its failed management and project control processes of the past. Similar to major infra-structure projects, actual completion times can vary substantially from initial estimates but this uncertainty is too crucial to the nuclear industry due to high levels of capital at risk, for every year a project is delayed the levelized cost of electricity increases by approximately 8-10%. causes of delay, to develop a generalized AHP model for delay factors, and to prioritize the risk in different factors in various levels of construction phase in international turnkey NPP project. This paper describes and prioritizes Nuclear Power Plant (NPP) construction schedule delay factor for turnkey international project. This study also determines the different party's importance in percentage behind the construction schedule delay of NPP which constitutes main contractor (28.4%), regulatory authority (27.3%), financial and country factor (23.5%), and utility (20.8%). Decision makers of nuclear industry can understand the significance of different factors on NPP construction phase and they can apply risk informed decision making to avoid unexpected

  10. Prioritization of Delay Factors for NPP Construction Risk in International Project by Using AHP Methodology

    International Nuclear Information System (INIS)

    Hossen, Muhammed Mufazzal; Kang, Sunkoo; Kim, Jonghyun

    2014-01-01

    It is crucial for the nuclear power plant project decision makers and management personnel to identify the actual factors of construction delay and their ranking in order to take preventive actions. NPP project is complex in nature and the construction phase is one of the most key phase which is subject to many factors result from many sources. From experience, nuclear projects have faced challenges similar to other complex mega projects with additional nuclear specific issues and life time cost of nuclear reactor is concentrated upfront as capital cost, and therefore delays in construction may become intolerable in terms of both lost revenues and interest on the capital. Budget over-runs and delays on next generation new build nuclear projects in recent years clearly demonstrate that the nuclear industry continues to repeat its failed management and project control processes of the past. Similar to major infra-structure projects, actual completion times can vary substantially from initial estimates but this uncertainty is too crucial to the nuclear industry due to high levels of capital at risk, for every year a project is delayed the levelized cost of electricity increases by approximately 8-10%. causes of delay, to develop a generalized AHP model for delay factors, and to prioritize the risk in different factors in various levels of construction phase in international turnkey NPP project. This paper describes and prioritizes Nuclear Power Plant (NPP) construction schedule delay factor for turnkey international project. This study also determines the different party's importance in percentage behind the construction schedule delay of NPP which constitutes main contractor (28.4%), regulatory authority (27.3%), financial and country factor (23.5%), and utility (20.8%). Decision makers of nuclear industry can understand the significance of different factors on NPP construction phase and they can apply risk informed decision making to avoid unexpected

  11. Architect Critical Challenges as a Project Manager in Construction Projects: A Case Study

    Directory of Open Access Journals (Sweden)

    Mohammadreza Yadollahi

    2014-01-01

    Full Text Available All construction professionals such as civil, mechanical, and electrical engineers, quantity surveyors, and architects have important roles in the construction process. Among these, architects are frequently appointed as a project manager (PM. The role of a PM will drive the success of the projects implementation. Therefore, the capability of an architect as a PM (ArPM is critical in reducing challenges encountered. Accordingly, the identification of these challenges is an important task in selecting an appropriate ArPM. The aim of this study is to identify the most critical challenges faced by an ArPM for construction projects. The data were collected through questionnaires and interviews with architects and professionals in the Malaysian construction industry. Because of the fuzziness and uncertainty of subjective responses, Fuzzy Set Ttheory is applied to identify critical challenges. A total of 65 questionnaires were distributed and 36 questionnaires were returned. The results revealed that the critical challenges faced by an ArPM are “poor planning,” “unfamiliar technology,” “unfamiliarity with green buildings and materials,” “inappropriate scheduling,” and “poor workmanship.” All critical challenges were then categorized into six main groups including technical, managerial, personal skills, contractual, psychological, and financial.

  12. Tools and techniques for schedule's controlling: tracking system and control of Urucu-Manaus gas-pipeline construction, stretch B1

    Energy Technology Data Exchange (ETDEWEB)

    Zuany, Valdenise Marques; Dias, Jose Luiz Gomes [CONCREMAT Engenharia e Tecnologia S/A, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The goal is to show the monitoring systems and deadline control, using the PMBOK{sup R} project management tools, in the Construction and Assembly of the Coari-Manaus Gas-pipeline, stretch B1, which includes the cities of Coari, Codajas, Anori and Anama, in the state of Amazon, in the Northern Undertaking Implementation (IENOR), an Engineering division of the PETROBRAS System. This report presents the practical effects of the usage of three schedule control tools of the project: Performance Measurement, using the technique of the Earned Value Management (EVM), which integrates cost, schedule and physical progress of the enterprise to determine the variations of schedule and performance; Project Management Software, MSProject, which allows schedule's elaboration and makes the tracking of the planned dates possible (baseline) in relation to real dates and forecasts the trend level, the effects of changes in the project's schedule, demonstrating its utility as a schedule control tool; and Schedule Variance Analysis, which adopts practical data to reach the pessimistic, most likely and optimistic expectations. The implantation of these tools was based in the Work Breakdown Structure of the enterprise. The application of these three tools in the tracking and control of the enterprise demonstrates that, the use of information and techniques deriving from the planning and control can be an important support for project management and decision taking, comparing the results gotten in the implantation of the plan with its actual realization, defining, thus, the necessary corrective actions, generating learned lessons to use in future projects. (author)

  13. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  14. A Conceptual Grey Analysis Method for Construction Projects

    Directory of Open Access Journals (Sweden)

    Maria Mikela Chatzimichailidou

    2015-05-01

    Full Text Available Concerning engineers, project management is a crucial field of research and development. Projects of high uncertainty and scale are characterized by risk, primarily related to their completion time. Thus, safe duration estimations, throughout the planning of a project, are a key objective for project managers. However, traditional linear approaches fail to include and sufficiently serve the dynamic nature of activities duration. On this ground, attention should be paid to designing and implementing methodologies that approximate the duration of the activities during the phase of planning and scheduling too. The grey analysis mathematical modeling seems to gain grounds, since it gradually becomes a well-adapted and up-to-date technique for numerous scientific sectors. This paper examines the contribution of the logic behind the aforementioned analysis, aiming to predict possible future divergences of task durations in big construction projects. Based on time observations of critical instances, a conceptual method is developed for making duration estimations and communicating deviations from the original schedule, in a way that approximations will fit reality better. The whole procedure endeavors to investigate the decrease of uncertainty, regarding project completion time and reduce, up to a scale, a possible inaccurate estimation of a project manager. The utmost effort is about exploiting the gained experience and eliminating the “hedgehog syndrome”. This is attainable by designing a reliable, easily updated, and readable information system. An enlightening example is to be found in the last section.

  15. Construction of basic match schedules for sports competitions by using graph theory

    NARCIS (Netherlands)

    van Weert, Arjan; Schreuder, J.A.M.; Burke, Edmund; Carter, Michael

    1997-01-01

    Basic Match Schedules are important for constructing sports timetables. Firstly these schedules guarantee the fairness of the sports competitions and secondly they reduce the complexity of the problem. This paper presents an approach to the problem of finding Basic Match Schedules for sports

  16. Delay consequencies in the construction time-schedule of nuclear power plants in relation to its safety and quality

    International Nuclear Information System (INIS)

    Recalde, J.A.

    1991-01-01

    An important delay in the construction time-schedule of a Nuclear Power Plant affects its safety and quality. This mainly occurs as a consequence of four reasons: discontinuity of the personnel working for the project; discontinuities of project suppliers; new safety and quality concepts; long-term storage. This work analyses each of the above reasons so as to foresee countermeasures to garantee the non deterioration of a Nuclear Power Plant. (author)

  17. Second unit scheduling concerns on a dual-unit nuclear project

    International Nuclear Information System (INIS)

    Block, H.R.; Mazzini, R.A.

    1978-01-01

    This paper explores the planning and scheduling problems of Unit 2 of the Susquehanna steam electric station. The causes of these problems and methods to avoid or mitigate their consequences are discussed. The Susquehanna steam electric station has two boiling water reactors rated at 1,100 MW each. Topics considered include cost factors, structures, equipment, engineering and home office, construction services, completion data phasing, work sequencing, structural dependences, and segregation. Substatial cost and schedule benefits can result if two nuclear units are designed and constructed as one integral station, and if maximum sharing of facilities and services between the units occurs. It is concluded that the cost benefits of highly integrated dual unit construction outweigh the schedule and logistical problems caused by that approach

  18. Location-based Scheduling

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    on the market. However, CPM is primarily an activity based method that takes the activity as the unit of focus and there is criticism raised, specifically in the case of construction projects, on the method for deficient management of construction work and continuous flow of resources. To seek solutions...... to the identified limitations of the CPM method, an alternative planning and scheduling methodology that includes locations is tested. Location-based Scheduling (LBS) implies a shift in focus, from primarily the activities to the flow of work through the various locations of the project, i.e. the building. LBS uses...... the graphical presentation technique of Line-of-balance, which is adapted for planning and management of work-flows that facilitates resources to perform their work without interruptions caused by other resources working with other activities in the same location. As such, LBS and Lean Construction share...

  19. 4D Applications of GIS in Construction Management

    Directory of Open Access Journals (Sweden)

    A. Chaitanya Kumar

    2017-01-01

    Full Text Available Construction industries broadly involve different set of construction activities which are to be executed as per schedule and the major software used for scheduling is PRIMAVERA and Microsoft Project (MSP. But the software still lacks a feature of providing spatial aspects of information in construction schedule. Recently, advanced technology like 4D GIS plays a major role in overcoming the limitation of the software. 4D GIS technology includes integration of 2D drawings from AutoCAD and schedules prepared in PRIMAVERA software. In the present study, a multistair residential building has been selected. ARCMAP 10.2 is used for interlinking of schedules as well as drawings and ARCSCENE has been used for developing 4D view. This linkage between scheduled activities and respective drawings in GIS helps in identifying construction sequences and also in detecting logical errors that occur in project schedules. The developed 4D view provides better visualization of construction progress of a project.

  20. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  1. Resource-constrained project scheduling problem: review of past and recent developments

    Directory of Open Access Journals (Sweden)

    Farhad Habibi

    2018-01-01

    Full Text Available The project scheduling problem is both practically and theoretically of paramount importance. From the practical perspective, improvement of project scheduling as a critical part of project management process can lead to successful project completion and significantly decrease of the relevant costs. From the theoretical perspective, project scheduling is regarded as one of the in-teresting optimization issues, which has attracted the attention of many researchers in the area of operations research. Therefore, the project scheduling issue has been significantly evaluated over time and has been developed from various aspects. In this research, the topics related to Re-source-Constrained Project Scheduling Problem (RCPSP are reviewed, recent developments in this field are evaluated, and the results are presented for future studies. In this regard, first, the standard problem of RCPSP is expressed and related developments are presented from four as-pects of resources, characteristics of activities, type of objective functions, and availability level of information. Following that, details about 216 articles conducted on RCPSP during 1980-2017 are expressed. At the end, in line with the statistics obtained from the evaluation of previ-ous articles, suggestions are made for the future studies in order to help the development of new issues in this area.

  2. Scheduling in Engineering, Project, and Production Management

    OpenAIRE

    Chien-Ho Ko

    2015-01-01

    This issue presents five papers selected from the 2013 (4th) International Conference on Engineering, Project, and Production Management (EPPM2013) held in Bangkok, Thailand. Three of the papers deal with scheduling problems faced in project and production management, while the remaining two focus on engineering management issues.

  3. Efficient Academic Scheduling at the U.S. Naval Academy

    National Research Council Canada - National Science Library

    Zane, David

    2003-01-01

    This research project examined academic scheduling problems at the U.S. Naval Academy. The focus was on devising methods to construct good final exam schedules and improve existing course schedules by facilitation course changes...

  4. Pre-emptive resource-constrained multimode project scheduling using genetic algorithm: A dynamic forward approach

    Directory of Open Access Journals (Sweden)

    Aidin Delgoshaei

    2016-09-01

    Full Text Available Purpose: The issue resource over-allocating is a big concern for project engineers in the process of scheduling project activities. Resource over-allocating drawback is frequently seen after scheduling of a project in practice which causes a schedule to be useless. Modifying an over-allocated schedule is very complicated and needs a lot of efforts and time. In this paper, a new and fast tracking method is proposed to schedule large scale projects which can help project engineers to schedule the project rapidly and with more confidence. Design/methodology/approach: In this article, a forward approach for maximizing net present value (NPV in multi-mode resource constrained project scheduling problem while assuming discounted positive cash flows (MRCPSP-DCF is proposed. The progress payment method is used and all resources are considered as pre-emptible. The proposed approach maximizes NPV using unscheduled resources through resource calendar in forward mode. For this purpose, a Genetic Algorithm is applied to solve. Findings: The findings show that the proposed method is an effective way to maximize NPV in MRCPSP-DCF problems while activity splitting is allowed. The proposed algorithm is very fast and can schedule experimental cases with 1000 variables and 100 resources in few seconds. The results are then compared with branch and bound method and simulated annealing algorithm and it is found the proposed genetic algorithm can provide results with better quality. Then algorithm is then applied for scheduling a hospital in practice. Originality/value: The method can be used alone or as a macro in Microsoft Office Project® Software to schedule MRCPSP-DCF problems or to modify resource over-allocated activities after scheduling a project. This can help project engineers to schedule project activities rapidly with more accuracy in practice.

  5. Application of 3D model in the schedule management of nuclear power plant construction

    International Nuclear Information System (INIS)

    Nian Fayang

    2009-01-01

    While 3D technology has been widely used in engineering design, the 3D model of engineering design also includes information that can be used to construction. By the visual interface, the 3D model can be used in different aspects of construction. By linking the 3D model with the construction schedule, the 4D model can be created, through which the visual manage of the construction schedule can be achieved. (authors)

  6. Schedule reconciliation tests for management prudency determination

    International Nuclear Information System (INIS)

    Howell, G.E.

    1986-01-01

    The prudency audit of a nuclear project involves engineering, construction, financial, and management dimensions. The audit must retrospectively evaluate the decisions and actions of management decision makers and then equitably allocate the cost impacts of those decisions and actions in a comprehensive and objective manner. In most situations, determination of the impact of schedule delays is a paramount issue. Manzi and Associates uses an approach to schedule reconciliation that focuses on the site-specific, as-built condition. The as-built schedule model is analyzed by a backward pass, or but-for methodology which focuses on the causes and impacts of identified delays. The objective is to demonstrate that but-for the identified delay, the project could have been built in the as-planned time frame. The but-for methodology has been used in many contract dispute cases and is currently being applied to schedule reconciliation on several nuclear plants. The potential for applying this methodology to both new construction and retrofit projects is great

  7. Advanced construction methods in ACR

    International Nuclear Information System (INIS)

    Elgohary, M.; Choy, E.; Yu, S.K.W.

    2002-01-01

    The ACR - Advanced CANDU Reactor, developed by Atomic Energy of Canada Limited (AECL), is designed with constructability considerations as a major requirement during all project phases from the concept design stage to the detail design stage. This necessitated a much more comprehensive approach in including constructability considerations in the design to ensure that the construction duration is met. For the ACR-700, a project schedule of 48 months has been developed for the nth replicated unit with a 36 month construction period duration from First Concrete to Fuel Load. An overall construction strategy that builds on the success of the construction methods that are proven in the construction of the Qinshan CANDU 6 project has been developed for the ACR. The overall construction strategy comprises the 'Open Top' construction technique using a Very Heavy Lift crane, parallel construction activities, with extensive modularization and prefabrication. In addition, significant applications of up to date construction technology will be implemented, e.g. large volume concrete pours, prefabricated rebar, use of climbing forms, composite structures, prefabricated permanent formwork, automatic welding, and utilization of the latest electronic technology tools such as 3D CADDs modelling yields a very high quality, clash free product to allow construction to be completed 'right the first time' and eliminates rework. Integration of 3D CADDs models and scheduling tools such as Primavera has allowed development of actual construction sequences and an iterative approach to schedule verification and improvement. Modularization and prefabrication are major features of the ACR design in order to achieve the project schedule. For the reactor building approximately 80% of the volume will be installed as modules or prefabricated assembles. This ensures critical path activities are achieved. This paper examines the advanced construction methods implemented in the design in order to

  8. A transportation-scheduling system for managing silvicultural projects

    Science.gov (United States)

    Jorge F. Valenzuela; H. Hakan Balci; Timothy McDonald

    2005-01-01

    A silvicultural project encompasses tasks such as sitelevel planning, regeneration, harvestin, and stand-tending treatments. an essential problem in managing silvicultural projects is to efficiently schedule the operations while considering project task due dates and costs of moving scarce resources to specific job locations. Transportation costs represent a...

  9. Application of coupled symbolic and numeric processing to an advanced scheduling system for plant construction

    International Nuclear Information System (INIS)

    Kobayashi, Yasuhiro; Takamoto, Masanori; Nonaka, Hisanori; Yamada, Naoyuki

    1994-01-01

    A scheduling system has been developed by integrating symbolic processing functions for constraint handling and modification guidance, with numeric processing functions for schedule optimization and evaluation. The system is composed of an automatic schedule generation module, interactive schedule revision module and schedule evaluation module. The goal of the problem solving is the flattening of the daily resources requirement throughout the scheduling period. The automatic schedule generation module optimizes the initial schedule according to the formulatable portion of requirement description specified in a predicate-like language. A planning engineer refines the near-goal schedule through a knowledge-based interactive optimization process to obtain the goal schedule which fully covers the requirement description, with the interactive schedule revision module and schedule evaluation module. A scheduling system has been implemented on the basis of the proposed problem solving framework and experimentally applied to real-world sized scheduling problems for plant construction. With a result of the overall plant construction scheduling, a section schedule optimization process is described with the emphasis on the symbolic processing functions. (author)

  10. How Can Lean Construction Improve the Daily Schedule of A Construction Manager?

    Science.gov (United States)

    Binninger, Marco; Dlouhy, Janosch; Schneider, Johannes; Haghsheno, Shervin

    2017-10-01

    The outcome of construction projects highly depends on effective management. The site manager is responsible for the site, and has a key role in executing construction projects. Especially this position has a wide range of tasks and a high volume of workload, which has to be carried out in a high pressure and high stress environment. Chaotic construction processes often create these working conditions. Lean Construction can help to organize the construction site in a better way and automatically supports the site manager.

  11. A team leadership approach to managing the transition from construction to operations for an environmental project

    International Nuclear Information System (INIS)

    Kelly, J.W.

    1994-06-01

    This presentation describes a team approach, at the totalproject level that focused team members with common objectives, for the transition to start-up and operation of the project. The Integrated Management Team (IMT) approach has been successful for this US Department of Energy (DOE) environmental restoration project at the Hanford Site in Richland, Washington. The $53.8-million project will collect, treat, and dispose of low-level mixed waste water discharges from the Hanford Site. Construction is scheduled for completion in September 1994 and facility start-up in June 1995. The project challenge is for leadership that is committed to the transition from construction to operation of the environmental restoration project

  12. Multiobjective genetic algorithm approaches to project scheduling under risk

    OpenAIRE

    Kılıç, Murat; Kilic, Murat

    2003-01-01

    In this thesis, project scheduling under risk is chosen as the topic of research. Project scheduling under risk is defined as a biobjective decision problem and is formulated as a 0-1 integer mathematical programming model. In this biobjective formulation, one of the objectives is taken as the expected makespan minimization and the other is taken as the expected cost minimization. As the solution approach to this biobjective formulation genetic algorithm (GA) is chosen. After carefully invest...

  13. Staffing, overtime, and shift scheduling project

    International Nuclear Information System (INIS)

    Lewis, P.M.

    1989-01-01

    Recent events at the Peach Bottom nuclear power plant have demonstrated the need to establish a quantifiable basis for assessing the safety significance of long work hours on nuclear power plant operators. The incidents at TMI-2, Chernobyl, and Bhopal, which all occurred during the late evening/night shift, further highlight the importance of the relationship between shift scheduling and performance. The objective of this project is to estimate, using statistical analysis on data from the nuclear industry, the effects on safety of staffing levels, overtime, and shift scheduling for operators and maintenance personnel. Regarding staffing levels, the Nuclear Regulatory Commission (NRC) currently has no explicit regulation concerning the minimum acceptable levels of staffing in a plant that has an operating license. The NRC has no systematic method for collecting data on the number of licensed operators on the operating crews. In 1982 the NRC recommended that plants write into their technical specifications a model policy on overtime. Currently, 77 nuclear power plant units have the model policy or a modification of it written into their technical specifications; 33 units have no policy on overtime. The model policy sets limits on overtime for safety related personnel, although these limits can be exceeded with plant manger approval. The US nuclear power industry has three types of shift schedules: (1) forward-rotating 8-hour/day shift schedules, (2) backward-rotating 8-hour/day schedules, and (3) 12-hour/day schedules

  14. Radioactive Waste Management System: Draft Project Decision Schedule. Revision

    International Nuclear Information System (INIS)

    1985-07-01

    The Nuclear Waste Policy Act (NWPA) of 1982 (Pub. L. 97-425) requires that the Secretary of Energy prepare, in cooperation with affected Federal agencies, a Project Decision Schedule that portrays the optimum way to attain the operation of geologic repositories. The Draft Project Decision Schedule portrays the major milestones of the Radioactive Waste Management System. It also depicts the set of activities for which Federal agencies have responsibility and the deadlines for taking the required action that are associated with the activities. The NWPA also requires that Federal agencies having determined that they: (1) cannot comply with a deadline for taking a required action; or (2) fail to comply with a deadline contained in the Project Decision Schedule; submit a comprehensive report to the Secretary of Energy and Congress to explain their failure or expected failure. The Secretary, in turn, is required to submit to Congress a response to the agency's report. 7 figs., 13 tabs

  15. Improving construction performance

    International Nuclear Information System (INIS)

    1990-03-01

    Design for Constructability's overall purpose was to identify and address changes in the nuclear industry to restore nuclear energy as an attractive option for new generating capacity. As the centerpiece of project control, a comprehensive, stable schedule should organize the project logically to accomplish the project's objectives. A good schedule will: integrate the project team; serve as a communications tool to all members of the project team; and provide a means to monitor and measure project performance

  16. An Improved Multiobjective PSO for the Scheduling Problem of Panel Block Construction

    Directory of Open Access Journals (Sweden)

    Zhi Yang

    2016-01-01

    Full Text Available Uncertainty is common in ship construction. However, few studies have focused on scheduling problems under uncertainty in shipbuilding. This paper formulates the scheduling problem of panel block construction as a multiobjective fuzzy flow shop scheduling problem (FSSP with a fuzzy processing time, a fuzzy due date, and the just-in-time (JIT concept. An improved multiobjective particle swarm optimization called MOPSO-M is developed to solve the scheduling problem. MOPSO-M utilizes a ranked-order-value rule to convert the continuous position of particles into the discrete permutations of jobs, and an available mapping is employed to obtain the precedence-based permutation of the jobs. In addition, to improve the performance of MOPSO-M, archive maintenance is combined with global best position selection, and mutation and a velocity constriction mechanism are introduced into the algorithm. The feasibility and effectiveness of MOPSO-M are assessed in comparison with general MOPSO and nondominated sorting genetic algorithm-II (NSGA-II.

  17. Hanford's 100-HX Pump and Treat Project - a Successful Blend of Science, Technology, Construction, and Project Management - 12412

    Energy Technology Data Exchange (ETDEWEB)

    Albin, Kenneth A.; Bachand, Marie T.; Biebesheimer, Fred H.; Neshem, Dean O.; Smoot, John L. [CH2M HILL Plateau Remediation Company, Richland, Washington 99352 (United States)

    2012-07-01

    sophisticated scientific modeling optimized the 100-HX's approximately 0.7 square mile (181 hecto-meters) extraction and injection well field to support continuous operation of a maximum of 800 gallons (3,028 liters) per minute, 24 hours per day, and 7 days per week. The use of traditional resin technology for the plant's ion exchange system required a change out of the resin every 12 weeks and shipment to an offsite facility 1,500 miles (2,414 kilometers) away for regeneration. Instead, the project leadership pursued newer technology with a disposable resin that could be disposed of on-site and would require less frequent change outs, reducing the project's life cycle costs by more than $16 million. Constructing the facility had its own challenges. The well field location overlapped ecologically sensitive lands where bald eagles and native wildlife use the land for their mating habitat for nearly half of the year. Building locations had to be planned around historically and culturally sensitive areas, and around another contractor's remediation work zones. Also, the size of the well field required a transfer (pumping) facility and installation of more than 60 miles (97 kilometers) of high-density polypropylene pipe, 23 miles (38 kilometers) of power cable, and 28 miles (46 kilometers) of control cable. Along with schedule and budget constraints typical of any fast-track project, the project team dealt with severe resource constraints due to competing projects across the Hanford Site caused by the influx of American Recovery and Reinvestment Act stimulus funding. In addition, the project team itself was stretched between completing another $25 million dollar construction project while designing and constructing this project. In order to save money, the project schedule was compressed by three months from the original baseline schedule. This was made possible by the strong use of project management principles throughout the design, construction, and testing

  18. Constructability - from Qinshan to the ACR

    International Nuclear Information System (INIS)

    Elgohary, M.; Fairclough, N.; Ricciuti, R.

    2003-01-01

    AECL has recognised the importance of Constructability for many years and is applying its principals to CANDU projects with increasing success. Constructability is defined as the consideration of construction knowledge and experience during all phases of a project, and recognizes that maximum benefit can be achieved during the concept phases of a project. The CANDU 6 Nuclear Power Plant has been constructed eleven times in the last 25 years, however, the last two units being completed on the Qinshan project in China have employed some very innovative construction methods that have not been used on the previous units. In order to make nuclear power generation more competitive, shorter construction schedules and reduced project costs and risks are essential objectives. The application of constructability principles is a major contributor to achieving these objectives. The success of Qinshan has increased the confidence in the new construction methods which are being implemented on the ACR (Advanced CANDU Reactor) successfully. An ACR construction strategy that utilizes advanced construction techniques has been developed by AECL. The strategy includes paralleling of activities by using extensive modularization and the vertical installation of equipment and modules into the reactor building, using a VHL (Very Heavy Lift) crane. This strategy allows short schedules to be met with a minimum risk to the project. This paper describes the latest construction methods used successfully on the Qinshan CANDU 6 project and looks at the extensive implementation of similar methods for ACR. It is concluded, based on the Qinshan success, that the ACR construction schedule is readily achievable. (author)

  19. The research of electrical tracing system construction management and related questions of BOP project

    International Nuclear Information System (INIS)

    Wang Lining; Li Jingmin; Ma Ding; Tu Haitao

    2015-01-01

    Based on Hongyanhe nuclear power plant in Liaoning province, the paper studies the anti-freeze and heat tracing work of BOP project. It compares several different heat tracing solutions in terms of technicality and applicability, and gave the most suitable scheme by using electrical tracing. It also presents the construction details of the electrical tracing system, analyzes the key points of the construction management from quantity, safety and schedule aspects, and gave the improvement suggestions. (authors)

  20. Athabasca--special report No. 1, we are progressing on schedule

    Energy Technology Data Exchange (ETDEWEB)

    Moss, A E

    1966-09-01

    Since April of 1964 when the government of Alberta gave permission for the production of crude oil from the Athabasca Tar Sands, construction of a $240 million oil sands venture has been progressing according to schedule. This plant will be capable of processing 45,000 bbl of crude oil per day and will require the mining of approximately 135,000 tons of material per day. The scheduled completion date for this project is Sept. 1967. This huge project consists of the construction of various plant units and service facilities, preparation of the mine for production, construction of a highway and a multi- million dollar bridge, and the design and construction of a 16-in. pipeline 266 miles in length. A shortage of experienced engineers, supervisors, and skilled tradesmen has been the largest problem. In spite of the many problems encountered, approximately 50% of the construction has now been completed and the plant will be completed on schedule.

  1. Managing engineering to meet construction requirements

    International Nuclear Information System (INIS)

    Martin, D.F.; Houchen, J.D.

    1976-01-01

    The San Onofre Units 2 and 3 Project schedule is compared with Bechtel's Generic Nuclear Power Plant schedule. This comparison shows that the major delays experienced on the San Onofre Project have resulted from the regulatory process. To date, Engineering has met Construction's requirements and the Project has not experienced any Engineering related delays. The San Onofre Project has been faced with many uncertainties, such as limited site area, high seismic design criteria, new and changing Federal and State regulations, shifts in supplier market conditions and unpredictable supplier performance. Each of these uncertainties has impacted the Engineering effort and jeopardized project schedule goals. The SCE-Bechtel Engineering Management team has acted to mitigate the impact of these uncertainties through use of a cost trend program, simplification of SCE-Bechtel interfaces, close Engineering-Construction coordination, the use of task forces to handle critical supplier problems and the use of additional Engineering personnel, etc. so that Construction requirements have been met

  2. Construction project management handbook.

    Science.gov (United States)

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  3. Time-constrained project scheduling with adjacent resources

    NARCIS (Netherlands)

    Hurink, Johann L.; Kok, A.L.; Paulus, J.J.; Schutten, Johannes M.J.

    We develop a decomposition method for the Time-Constrained Project Scheduling Problem (TCPSP) with adjacent resources. For adjacent resources the resource units are ordered and the units assigned to a job have to be adjacent. On top of that, adjacent resources are not required by single jobs, but by

  4. Time-constrained project scheduling with adjacent resources

    NARCIS (Netherlands)

    Hurink, Johann L.; Kok, A.L.; Paulus, J.J.; Schutten, Johannes M.J.

    2008-01-01

    We develop a decomposition method for the Time-Constrained Project Scheduling Problem (TCPSP) with Adjacent Resources. For adjacent resources the resource units are ordered and the units assigned to a job have to be adjacent. On top of that, adjacent resources are not required by single jobs, but by

  5. A Multiagent Evolutionary Algorithm for the Resource-Constrained Project Portfolio Selection and Scheduling Problem

    Directory of Open Access Journals (Sweden)

    Yongyi Shou

    2014-01-01

    Full Text Available A multiagent evolutionary algorithm is proposed to solve the resource-constrained project portfolio selection and scheduling problem. The proposed algorithm has a dual level structure. In the upper level a set of agents make decisions to select appropriate project portfolios. Each agent selects its project portfolio independently. The neighborhood competition operator and self-learning operator are designed to improve the agent’s energy, that is, the portfolio profit. In the lower level the selected projects are scheduled simultaneously and completion times are computed to estimate the expected portfolio profit. A priority rule-based heuristic is used by each agent to solve the multiproject scheduling problem. A set of instances were generated systematically from the widely used Patterson set. Computational experiments confirmed that the proposed evolutionary algorithm is effective for the resource-constrained project portfolio selection and scheduling problem.

  6. Analyzing Integrated Cost-Schedule Risk for Complex Product Systems R&D Projects

    Directory of Open Access Journals (Sweden)

    Zhe Xu

    2014-01-01

    Full Text Available The vast majority of the research efforts in project risk management tend to assess cost risk and schedule risk independently. However, project cost and time are related in reality and the relationship between them should be analyzed directly. We propose an integrated cost and schedule risk assessment model for complex product systems R&D projects. Graphical evaluation review technique (GERT, Monte Carlo simulation, and probability distribution theory are utilized to establish the model. In addition, statistical analysis and regression analysis techniques are employed to analyze simulation outputs. Finally, a complex product systems R&D project as an example is modeled by the proposed approach and the simulation outputs are analyzed to illustrate the effectiveness of the risk assessment model. It seems that integrating cost and schedule risk assessment can provide more reliable risk estimation results.

  7. Simulated Annealing Genetic Algorithm Based Schedule Risk Management of IT Outsourcing Project

    Directory of Open Access Journals (Sweden)

    Fuqiang Lu

    2017-01-01

    Full Text Available IT outsourcing is an effective way to enhance the core competitiveness for many enterprises. But the schedule risk of IT outsourcing project may cause enormous economic loss to enterprise. In this paper, the Distributed Decision Making (DDM theory and the principal-agent theory are used to build a model for schedule risk management of IT outsourcing project. In addition, a hybrid algorithm combining simulated annealing (SA and genetic algorithm (GA is designed, namely, simulated annealing genetic algorithm (SAGA. The effect of the proposed model on the schedule risk management problem is analyzed in the simulation experiment. Meanwhile, the simulation results of the three algorithms GA, SA, and SAGA show that SAGA is the most superior one to the other two algorithms in terms of stability and convergence. Consequently, this paper provides the scientific quantitative proposal for the decision maker who needs to manage the schedule risk of IT outsourcing project.

  8. Causes of Construction Delays in Qatar Construction Projects

    OpenAIRE

    Murat Gunduz; Mohanad H. A. AbuHassan

    2016-01-01

    Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction ...

  9. Heuristic algorithm for single resource constrained project scheduling problem based on the dynamic programming

    Directory of Open Access Journals (Sweden)

    Stanimirović Ivan

    2009-01-01

    Full Text Available We introduce a heuristic method for the single resource constrained project scheduling problem, based on the dynamic programming solution of the knapsack problem. This method schedules projects with one type of resources, in the non-preemptive case: once started an activity is not interrupted and runs to completion. We compare the implementation of this method with well-known heuristic scheduling method, called Minimum Slack First (known also as Gray-Kidd algorithm, as well as with Microsoft Project.

  10. PRACTICAL IMPLICATIONS OF LOCATION-BASED SCHEDULING

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    2007-01-01

    The traditional method for planning, scheduling and controlling activities and resources in construction projects is the CPM-scheduling, which has been the predominant scheduling method since its introduction in the late 1950s. Over the years, CPM has proven to be a very powerful technique...... that will be used in this study. LBS is a scheduling method that rests upon the theories of line-of-balance and which uses the graphic representation of a flowline chart. As such, LBS is adapted for planning and management of workflows and, thus, may provide a solution to the identified shortcomings of CPM. Even...

  11. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management

    International Nuclear Information System (INIS)

    Lesko, K.F.; Berriochoa, M.V.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, 'Management of Construction Projects, A Constructor's Perspective', University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted

  12. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    Energy Technology Data Exchange (ETDEWEB)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are

  13. Burrowing Owl and Other Migratory Bird Mitigation for a Runway Construction Project at Edwards AFB

    OpenAIRE

    Hoehn, Amber L.; Hagan, Mark; Bratton, Mark

    2009-01-01

    Edwards Air Force Base (AFB) scheduled the construction of a runway in the spring of 2007. The runway would be in an area that contained migratory birds and their habitat. The construction project would be near Edwards AFB main runway and had the potential not only to impact species protected under the Migratory Bird Treaty Act (MBTA), including the burrowing owl (Athene cunicularia), but also to increase bird and wildlife–aircraft strike hazards in the active flightline areas. To discourage ...

  14. Construction completion report

    International Nuclear Information System (INIS)

    1990-01-01

    This Construction Completion Report documents the major construction projects at the Waste Isolation Pilot Plant (WIPP) site and related information on contracts, schedules, and other areas which affected construction. This report is not intended to be an exhaustive detailed analysis of construction, but is a general overview and summary of the WIPP construction. 10 refs., 29 figs

  15. Do Projects really end late? On the shortcomings of the classical scheduling techniques

    Directory of Open Access Journals (Sweden)

    Pablo Ballesteros-Pérez

    2018-03-01

    Full Text Available Many engineering projects fail to meet their planned completion dates in real practice. This a recurrent topic in the project management literature, with poor planning and controlling practices frequently cited among the most significant causes of delays. Unfortunately, hardly any attention has been paid to the fact that the classical scheduling techniques: Gantt chart, Critical Path Method (CPM, and Program Evaluation and Review Technique (PERT, may not be as fit for purpose as they seem. Arguably, because of their relative simplicity, these techniques are still almost the only ones taught nowadays in most introductory courses to scheduling in many engineering and management degrees. However, by utterly ignoring or inappropriately dealing with activity duration variability, these techniques provide optimistic completion dates, while suffering from other shortcomings. Through a series of simple case studies that can be developed with a few participants and common dice, a systematic critique of the classical scheduling techniques is offered. Discussion of the case studies results illustrate why limiting the contents of scheduling education and teaching can be detrimental, as the aforementioned classical scheduling techniques cannot not provide project managers with sufficient resources to effectively plan and control real projects.

  16. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management To Safely And Effectively Complete Nuclear Construction Work

    International Nuclear Information System (INIS)

    Leso, K.F.; Hamilton, H.M.; Farner, M.; Heath, T.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  17. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    Energy Technology Data Exchange (ETDEWEB)

    LESO KF; HAMILTON HM; FARNER M; HEATH T

    2010-01-14

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  18. A visual representation system for the scheduling and management of projects

    NARCIS (Netherlands)

    Pollalis, S.N.

    1992-01-01

    A VISUAL SCHEDULING AND MANAGEMENT SYSTEM (VSMS) This work proposes a new system for the visual representation of projects that displays the quantities of work, resources and cost. This new system, called Visual Scheduling and Management System, has a built-in hierarchical system to provide

  19. A hybrid electromagnetism-like algorithm for a multi-mode resource-constrained project scheduling problem

    Directory of Open Access Journals (Sweden)

    Mohammad Hossein Sadeghi

    2013-08-01

    Full Text Available In this paper, two different sub-problems are considered to solve a resource constrained project scheduling problem (RCPSP, namely i assignment of modes to tasks and ii scheduling of these tasks in order to minimize the makespan of the project. The modified electromagnetism-like algorithm deals with the first problem to create an assignment of modes to activities. This list is used to generate a project schedule. When a new assignment is made, it is necessary to fix all mode dependent requirements of the project activities and to generate a random schedule with the serial SGS method. A local search will optimize the sequence of the activities. Also in this paper, a new penalty function has been proposed for solutions which are infeasible with respect to non-renewable resources. Performance of the proposed algorithm has been compared with the best algorithms published so far on the basis of CPU time and number of generated schedules stopping criteria. Reported results indicate excellent performance of the algorithm.

  20. Constructibility assessment of APR1400

    International Nuclear Information System (INIS)

    Cho, Sung Jae; Kang, Yong Chul; Lee, Jae Gon; Lim, Woo Sang

    2003-01-01

    APR1400 (formerly KNGR) development is one of national G-7 projects sponsored by government and KHNP (Korea Hydro and Nuclear Power Co., LTD). It is an evolutionary standard reactor with the thermal output of 4000MWt and has been adopted for Shin-Kori Unit 3 and 4. The government organizations, research institutes, universities and industries have participated in the project since 1992 along with KHNP, and the standard design certification program was issued in May 2002. The project set up the top-tier requirements about the safety, economy, operability and maintainability, and constructibility in the early design stage. The requirements have been evaluated periodically during the design process, and the results were reflected to the design. This paper describes the methods for constructibility enhancement and the results of schedule analysis to assure meeting construction duration target, which is set to 48 months from the first concrete pouring to the commercial operation on the condition that learning effects are maximized at Nth plant. To meet the target schedule, the design characteristics and constructibility studies such as new construction methods and construction schedule analysis were performed. The new construction methods presented here are over the top method for NSSS components, deck plate and steel from for concrete wall and slab, automatic welding for large bore piping, and modularization of components and structure, etc. (author)

  1. Scheduling of House Development Projects with CPM and PERT Method for Time Efficiency (Case Study: House Type 36)

    Science.gov (United States)

    Kholil, Muhammad; Nurul Alfa, Bonitasari; Hariadi, Madjumsyah

    2018-04-01

    Network planning is one of the management techniques used to plan and control the implementation of a project, which shows the relationship between activities. The objective of this research is to arrange network planning on house construction project on CV. XYZ and to know the role of network planning in increasing the efficiency of time so that can be obtained the optimal project completion period. This research uses descriptive method, where the data collected by direct observation to the company, interview, and literature study. The result of this research is optimal time planning in project work. Based on the results of the research, it can be concluded that the use of the both methods in scheduling of house construction project gives very significant effect on the completion time of the project. The company’s CPM (Critical Path Method) method can complete the project with 131 days, PERT (Program Evaluation Review and Technique) Method takes 136 days. Based on PERT calculation obtained Z = -0.66 or 0,2546 (from normal distribution table), and also obtained the value of probability or probability is 74,54%. This means that the possibility of house construction project activities can be completed on time is high enough. While without using both methods the project completion time takes 173 days. So using the CPM method, the company can save time up to 42 days and has time efficiency by using network planning.

  2. Project management in fossil plant construction: A perspective for the Nineties

    International Nuclear Information System (INIS)

    Bhatia, N.K.

    1991-01-01

    The continuing growth in demand for electric power, and the reluctance of electric utility management to commit to new capacity additions has created a potential for somewhat hectic activity in the fossil power plant construction market. With the changing matrix of power plant types and ownerships, the project manager is called upon to deliver a complex product with exacting contract requirements: lump sum contracts, competitive pricing, short schedules, and performance guarantees. A shortage of experienced professionals in the ranks of the owners, engineers, contractors, and suppliers magnifies the challenge. Plant replication, automation, creative management of vendors and contractors, and participative management of the work force will be key elements of successful projects. Partnering between the clients and the engineers-constructors will be an interesting new relationship model

  3. Integration of Building Information Modeling and Critical Path Method Schedules to Simulate the Impact of Temperature and Humidity at the Project Level

    Directory of Open Access Journals (Sweden)

    Yongwei Shan

    2014-07-01

    Full Text Available Steel construction activities are often undertaken in an environment with limited climate control. Both hot and cold temperatures can physically and psychologically affect construction workers, thus decreasing their productivity. Temperature and humidity are two factors that constantly exert forces on workers and influence their performance and efficiency. Previous studies have established a relationship between labor productivity and temperature and humidity. This research is built on the existing body of knowledge and develops a framework of integrating building information modeling (BIM with a lower level critical path method (CPM schedule to simulate the overall impact of temperature and humidity on a healthcare facility’s structural steel installation project in terms of total man hours required to build the project. This research effort utilized historical weather data of four cities across the U.S., with each city having workable seasons year-round and conducted a baseline assessment to test if various project starting dates and locations could significantly impact the project’s schedule performance. It was found that both varied project start dates and locations can significantly contribute to the difference in the man hours required to build the model project and that the project start date and location can have an interaction effect. This study contributes to the overall body of knowledge by providing a framework that can help practitioners better understand the overall impact of a productivity influencing factor at a project level, in order to facilitate better decision making.

  4. Effective Safety Management in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.

  5. The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem

    Directory of Open Access Journals (Sweden)

    Denis Pinha

    2016-11-01

    Full Text Available This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practical situations where the definition of optimal changes on a regular basis. The proposed approach empowers the project manager to determine what is optimal, on a given day, under the current constraints, such as, change of priorities, lack of skilled worker. The proposed method utilizes a simulation approach to determine feasible solutions, under the current constraints. Resources can be non-consumable, consumable, or doubly constrained. The paper also presents a real-life case study dealing with scheduling of ship repair activities.

  6. Development of econometric models for cost and time over-runs: an empirical study of major road construction projects in pakistan

    International Nuclear Information System (INIS)

    Khan, A.; Chaudhary, M.A.

    2016-01-01

    The construction industry is flourishing worldwide and contributes about 10% to the GDP of the world i.e. up to the tune of 4.6 Trillion US dollars. It employs almost 7% of the total employee dpersons and, consumes around 40% of the total energy. The Pakistani construction sector has displayed impressive growth in recent past years. The efficient road network is a key part of construction business and plays a significant role in the economic uplift of country. The overruns in costs and delays in completion of projects are very common phenomena and it has also been observed that the projects involving construction of roads also face problems of delays and cost over runs especially in developing countries. The causes of cost overruns and delays in road projects being undertaken by the premier road construction organization of Pakistan National Highway Authority (NHA) have been considered in this study. It has been done specifically in the context of impact of cause(s) determined from project report of a total of one hundred and thirty one (131) projects. The ten causative factors which we recognize as Design, Planning and Scheduling Related problems, Financial Constraint Related reasons, Social Problem Related reasons, Technical Reasons, Administrative Reasons, Scope Increase, Specification Changes, Cost Escalation Related reasons, Non-Availability of Equipment or Material and Force Majeure play a commanding role in determination of the cost and time over runs. It has also been observed that among these identified causes, the factors of Administrative Reason, Design, Planning and Scheduling Related, Technical Reasons and Force Majeure are the most significant reasons in cost and time overruns. Whereas, the Cost Escalation related reasons has the least impact on cost increase and delays. The NHA possesses a financial worth of around Rs. 36 billion and with an annual turn over amounting to Rs. 22 billion is responsible to perform road construction project in entire

  7. Organizational analysis of construction projects

    OpenAIRE

    Hughes, Will

    1989-01-01

    This research project is about the analysis of construction project organizations. The work is based on organizational theory and is a development of Linear Responsibility Analysis (LRA). The aim is to assess the extent to which project success is affected by organizational structure. The analysis of four public sector case studies raises several issues. First is the need for a systematic model of describing and analysing construction project environments. A framework has been developed that ...

  8. Nuclear power. Volume 2: nuclear power project management

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    The following topics are discussed: review of nuclear power plants; licensing procedures; safety analysis; project professional services; quality assurance and project organization; construction, scheduling and operation; construction, scheduling and operation; nuclear fuel handling and fuel management; and plant cost management. 116 references, 115 figures, 33 tables

  9. Trevino Project: a fast-track approach for a small construction project

    International Nuclear Information System (INIS)

    Schick, C.J.; Lynn, N.S.

    1982-01-01

    The approach to a construction project can vary according to the size, location, and degree of difficulty associated with the project. This paper deals with one approach that can be taken to a small construction project, the fast-track approach. A small construction project can be defined as a project having less than $20 million capital cost or a project with a low degree of difficulty. This approach is very applicable to in-situ leaching uranium projects, small precious metal operations, etc. The approach to the small project is that of fast-tracking the project in order to minimize the time over which capital expenditure occurs and also to reduce the indirect costs of field expense, construction supplies, construction equipment, etc. In order to fast-track a project it is necessary to do a very precise job on the preliminary phases of the project such as preliminary engineering, plant site location, environmental permits, etc. 2 figures, 2 tables

  10. Genetic algorithm parameters tuning for resource-constrained project scheduling problem

    Science.gov (United States)

    Tian, Xingke; Yuan, Shengrui

    2018-04-01

    Project Scheduling Problem (RCPSP) is a kind of important scheduling problem. To achieve a certain optimal goal such as the shortest duration, the smallest cost, the resource balance and so on, it is required to arrange the start and finish of all tasks under the condition of satisfying project timing constraints and resource constraints. In theory, the problem belongs to the NP-hard problem, and the model is abundant. Many combinatorial optimization problems are special cases of RCPSP, such as job shop scheduling, flow shop scheduling and so on. At present, the genetic algorithm (GA) has been used to deal with the classical RCPSP problem and achieved remarkable results. Vast scholars have also studied the improved genetic algorithm for the RCPSP problem, which makes it to solve the RCPSP problem more efficiently and accurately. However, for the selection of the main parameters of the genetic algorithm, there is no parameter optimization in these studies. Generally, we used the empirical method, but it cannot ensure to meet the optimal parameters. In this paper, the problem was carried out, which is the blind selection of parameters in the process of solving the RCPSP problem. We made sampling analysis, the establishment of proxy model and ultimately solved the optimal parameters.

  11. 48 CFR 53.301-1427 - Standard Form 1427, Inventory Schedule A-Construction Sheet (Metals in Mill Product Form).

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Standard Form 1427, Inventory Schedule A-Construction Sheet (Metals in Mill Product Form). 53.301-1427 Section 53.301-1427... Illustrations of Forms 53.301-1427 Standard Form 1427, Inventory Schedule A—Construction Sheet (Metals in Mill...

  12. Analysis of Cost of Rework on Time and Cost Performance of Building Construction Projects in Abuja, Nigeria

    Directory of Open Access Journals (Sweden)

    Emmanuel Chidiebere Eze

    2018-01-01

    Full Text Available Rework is a menace that leads to undesired and unnecessary loss of efforts, it degrades project cost and schedule performance of construction projects, both at design and construction phases. This study therefore, analyzed the impact of cost of rework on time and cost performance of building construction projects in Nigerian, using selected commercial building project within the country’s capital. A pro forma was adopted for gathering data on rework cost, project cost and time of selected building projects, while structured questionnaire was used to collect information on the likely measures for reducing rework incidences from construction professionals that were involved in the delivery of the identified projects. Regression analysis, relative importance index and Kruskal-Walis test were employed for data analysis. The study revealed a significant relationship between the cost of rework and initial and final project cost of delivering commercial buildings, as an average of 3.53% impact on the initial project cost, 46.60% contribution to cost overrun, and p-value of 0.000 was observed on all assessed projects. For the project delivery time, a significant relationship between the cost of rework and initial and final project duration, as an average of 7.35% impact on the initial delivery time, extra 19 days and p-value of 0.000 was observed on all assessed projects. Team building and education, management commitment, employee involvement, were some of the best possible measures to minimized rework problems.

  13. The Difficulty in Following Project Schedule as a Key Project Management Challenge: Family Firm Perspective

    Directory of Open Access Journals (Sweden)

    Joanna SADKOWSKA

    2016-12-01

    Full Text Available The problem of how to manage projects successfully has been gaining growing interest for the last decades. The aforementioned is mainly caused by the fact that project management offers a wide range of methods and tools which, when properly used, can stimulate long-term growth of businesses. As a consequence it offers a particular development opportunity for family enterprises which, due to their specificity, have to overcome many difficulties. The primary objective of this paper is to examine whether family enterprises perceive, and to what extent, the factor of following project schedule as a difficulty in the area of project management. 154 Polish family firms representing different sectors were surveyed. The results of regression analysis show that family firms with global range of business activities, on the contrary to those with local or regional ones, do not find the factor of following project schedule as a difficulty. This results manly from the tools employed and the maturity level they have reached in project management. The findings support the current discussion on the specificity and uniqueness of family businesses in relationship to the knowledge area of project management. It also contributes to filling the gap on understanding the functioning of family firms in the emerging economies of Eastern Europe.

  14. A review of the design, construction and development of the PUSPATI project

    International Nuclear Information System (INIS)

    Ahmad Tajuddin Ali.

    1983-01-01

    The setting up of the Tun Ismail Atomic Research Centre (PUSPATI) was decided upon in September 1972 and soon after, plans were underway for the purchase of a research reactor and the construction of a research centre to house it. The centre was originally planned to be located at Sungai Buloh about 20 km to the north-west of Kuala Lumpur. However, in September 1978, a decision was made to locate the centre at Bangi, about 32 km to south of Kuala Lumpur. Earth work was started in January 1979 with clearing of the forest at the proposed site. Building construction started in February 1980. By September 1981, the reactor building was practically completed and enable reactor construction to begin. This was finished on July 15, 1982 when the reactor was officially handed over to PUSPATI. Work on the rest of the complex fell behind schedule and was only completed in July 1983 when PUSPATI moved in to occupy the research laboratories. The implementation of the PUSPATI project has been completed not without its share of problems. Its completion also marks the beginning of a new era for the development of nuclear science and technology in this country. This paper reviews the design, construction and development of the entire project. (author)

  15. Integrating a Procurement Management Process into Critical Chain Project Management (CCPM: A Case-Study on Oil and Gas Projects, the Piping Process

    Directory of Open Access Journals (Sweden)

    Sung-Hwan Jo

    2018-05-01

    Full Text Available Engineering, Procurement, and Construction (EPC of oil and gas megaprojects often experience cost overruns due to substantial schedule delays. One of the greatest causes of these overruns is the mismanagement of the project schedule, with the piping works (prefabrication and installation occupying a majority of that schedule. As such, an effective methodology for scheduling, planning, and controlling of piping activities is essential for project success. To meet this need, this study used the Critical Chain Project Management (CCPM to develop a piping construction delay prevention methodology, incorporating material procurement processes for EPC megaprojects. Recent studies indicate that the traditional scheduling method used on oil and gas mega projects has critical limitations regarding resource scarcity, calculation of activity duration, and dealing with uncertainties. To overcome these limitations, the Theory of Constraints-based CCPM was proposed and implemented to provide schedule buffers management. Nonexistent in literature, and of critical importance, is this paper’s focus on the resource buffer, representing material uncertainty and management. Furthermore, this paper presents a step-by-step process and flow chart for project, construction, and material managers to effectively manage a resource buffer through the CCPM process. This study extends the knowledge of traditional resource buffers in CCPM to improve material and procurement management, thus avoiding the shortage of piping materials and minimizing delays. The resultant process was validated by both deterministic and probabilistic schedule analysis through two case studies of a crude pump unit and propylene compressor installation at a Middle Eastern Refinery Plant Installation. The results show that the CCPM method effectively handles uncertainty, reducing the duration of piping works construction by about a 35% when compared to the traditional method. Furthermore, the

  16. Resource-constrained project scheduling: computing lower bounds by solving minimum cut problems

    NARCIS (Netherlands)

    Möhring, R.H.; Nesetril, J.; Schulz, A.S.; Stork, F.; Uetz, Marc Jochen

    1999-01-01

    We present a novel approach to compute Lagrangian lower bounds on the objective function value of a wide class of resource-constrained project scheduling problems. The basis is a polynomial-time algorithm to solve the following scheduling problem: Given a set of activities with start-time dependent

  17. Cost and schedule estimate to construct the tunnel and shaft remedial shielding concept, Los Alamos Meson Physics Facility, Los Alamos National Laboratory, Los Alamos, New Mexico. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-11-30

    The report provides an estimate of the cost and associated schedule to construct the tunnel and shaft remedial shielding concept. The cost and schedule estimate is based on a preliminary concept intended to address the potential radiation effects on Line D and Line Facilities in event of a beam spill. The construction approach utilizes careful tunneling methods based on available excavation and ground support technology. The tunneling rates and overall productivity on which the cost and project schedule are estimated are based on conservative assumptions with appropriate contingencies to address the uncertainty associated with geological conditions. The report is intended to provide supplemental information which will assist in assessing the feasibility of the tunnel and shaft concept and justification for future development of this particular aspect of remedial shielding for Line D and Line D Facilities.

  18. Managing Pre-Construction and Construction Risks on Project Sites in Abuja-Nigeria

    Directory of Open Access Journals (Sweden)

    Jimoh R.A.

    2016-03-01

    Full Text Available Managing risks in construction projects has been acknowledged as a key direction process for the purposes of attaining the project goal in terms of time, cost, quality, safety, and environmental sustainability. Hence, the paper evaluated pre-construction and construction risks on active project sites in Abuja-Nigeria. This was achieved using survey method through the self-administration of 35 questionnaires to the professionals handling the 35 identified projects being undertaking at that time. Results showed that errors and omissions in design and improperly defined project scope had mean score values of 3.03 and 2.54, respectively, were the construction risks most experienced by the professionals during pre-construction. On the other hand, fluctuation in market prices and delays with mean score values of 3.14 and 2.74, respectively, were the construction risks experienced by the professionals during the construction phase of the projects. It is recommended that procurement methods such as construction management should be adopted and stakeholders should keep to their own side of the bargain to avoid unnecessary delays.

  19. Construction and testing of JT-60

    International Nuclear Information System (INIS)

    Kishimoto, H.; Aikawa, H.; Oikawa, A.; Miya, N.; Suzuki, K.; Ozeki, T.; Tokutake, T.; Kunieda, S.; Hiruta, K.; Hosoda, R.

    1987-01-01

    The JT-60 project is reviewed in terms of design, R and D, construction, commissioning and project management. Design features of JT-60 have been refined and renewed through periodic assessments. Engineering targets have been achieved by R and D efforts. Construction and commissioning have progressed on schedule with intensive project management and control. JT-60 obtained high performance and has entered into the experimental phase after completion of machine construction. (orig.)

  20. Social cost in construction projects

    International Nuclear Information System (INIS)

    Çelik, Tolga; Kamali, Saeed; Arayici, Yusuf

    2017-01-01

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  1. Social cost in construction projects

    Energy Technology Data Exchange (ETDEWEB)

    Çelik, Tolga, E-mail: tolga.celik@emu.edu.tr [Department of Civil Engineering, Eastern Mediterranean University, Famagusta, T.R. North Cyprus, Via Mersin 10 (Turkey); Kamali, Saeed, E-mail: saeedkamali2002@gmail.com [Civil Engineering Department, Middle East Technical University, 06800 Ankara (Turkey); Arayici, Yusuf, E-mail: yusuf.arayici@hku.edu.tr [Department of Civil Engineering, Hasan Kalyoncu University, Gaziantep (Turkey)

    2017-05-15

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  2. The latest application of Hitachi's state-of-the-art construction technology and further evolution towards new build NPP projects

    International Nuclear Information System (INIS)

    Akagi, K.; Morita, K.; Miyahara, R.; Murayama, K.; Deir, C.; Akahori, S.

    2008-01-01

    Shika Nuclear Power Station Unit No.2 began commercial operation in March 2006 as one of the latest new-build projects in the world. Hitachi-GE Nuclear Energy Ltd. (Hitachi) was the main contractor and supplied the entire plant including engineering, manufacturing of all major reactor and turbine-generator components, and executed the installation and commissioning. Hitachi completed the project on schedule and on budget owing in large part to its highly reliable advanced construction technology. This article describes Hitachi's unsurpassed advanced construction technology being applied to the current new-build projects in Japan. Furthermore, this article addresses a possible form of applications to new build nuclear power plants in North America. (author)

  3. Cost and schedule reduction for next-generation Candu

    International Nuclear Information System (INIS)

    Hopwood, J.M.; Yu, S.; Pakan, M.; Soulard, M.

    2002-01-01

    AECL has developed a suite of technologies for Candu R reactors that enable the next step in the evolution of the Candu family of heavy-water-moderated fuel-channel reactors. These technologies have been combined in the design for the Advanced Candu Reactor TM1 (ACRTM), AECL's next generation Candu power plant. The ACR design builds extensively on the existing Candu experience base, but includes innovations, in design and in delivery technology, that provide very substantial reductions in capital cost and in project schedules. In this paper, main features of next generation design and delivery are summarized, to provide the background basis for the cost and schedule reductions that have been achieved. In particular the paper outlines the impact of the innovative design steps for ACR: - Selection of slightly enriched fuel bundle design; - Use of light water coolant in place of traditional Candu heavy water coolant; - Compact core design with unique reactor physics benefits; - Optimized coolant and turbine system conditions. In addition to the direct cost benefits arising from efficiency improvement, and from the reduction in heavy water, the next generation Candu configuration results in numerous additional indirect cost benefits, including: - Reduction in number and complexity of reactivity mechanisms; - Reduction in number of heavy water auxiliary systems; - Simplification in heat transport and its support systems; - Simplified human-machine interface. The paper also describes the ACR approach to design for constructability. The application of module assembly and open-top construction techniques, based on Candu and other worldwide experience, has been proven to generate savings in both schedule durations and overall project cost, by reducing premium on-site activities, and by improving efficiency of system and subsystem assembly. AECL's up-to-date experience in the use of 3-D CADDS and related engineering tools has also been proven to reduce both engineering and

  4. Management and integration of engineering and construction activities: Lessons learned from the AP1000R nuclear power plant China project

    International Nuclear Information System (INIS)

    McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C.

    2012-01-01

    The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, the organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)

  5. The methodic of calculation for the need of basic construction machines on construction site when developing organizational and technological documentation

    Science.gov (United States)

    Zhadanovsky, Boris; Sinenko, Sergey

    2018-03-01

    Economic indicators of construction work, particularly in high-rise construction, are directly related to the choice of optimal number of machines. The shortage of machinery makes it impossible to complete the construction & installation work on scheduled time. Rates of performance of construction & installation works and labor productivity during high-rise construction largely depend on the degree of provision of construction project with machines (level of work mechanization). During calculation of the need for machines in construction projects, it is necessary to ensure that work is completed on scheduled time, increased level of complex mechanization, increased productivity and reduction of manual work, and improved usage and maintenance of machine fleet. The selection of machines and determination of their numbers should be carried out by using formulas presented in this work.

  6. Investigation on the Factors Influencing Construction Time and Cost Overrun for High-Rise Building Projects In Penang

    Science.gov (United States)

    Nor Haslinda, A.; Xian, T. Wei; Norfarahayu, K.; Muhamad Hanafi, R.; Fikri, H. Muhammad

    2018-04-01

    Time and cost overruns have become one prominent issue for most construction projects around the world. Project costing and timeframe extension had been causing a lot of wastage and loss of opportunity for many parties involved. Therefore, this research was carried out to investigate the factors influencing time and cost overruns for high-rise construction projects in Penang, Malaysia. A set of questionnaires survey was distributed to the project managers who had been or currently involved in the high-rise building projects in Penang to get their input and perceptions for each factor identified as well as its frequency of occurrence. In order to rank all the factors gathered, the mean index of the most distinguishing factors and its frequency of occurrence were multiplied to get the severity index. The results revealed that for time overrun, the most predominant causes were due to design changes, inadequate planning and scheduling and poor labor productivity. Meanwhile, the predominant causes of cost overrun were poor pre-construction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost overruns for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants.

  7. Construction machine control guidance implementation strategy.

    Science.gov (United States)

    2010-07-01

    Machine Controlled Guidance (MCG) technology may be used in roadway and bridge construction to improve construction efficiencies, potentially resulting in reduced project costs and accelerated schedules. The technology utilizes a Global Positioning S...

  8. Impact of Fragmentation Issue in Construction Industry: An Overview

    Directory of Open Access Journals (Sweden)

    Mohd Nawi Mohd Nasrun

    2014-01-01

    Full Text Available In general, fragmentation within the construction industry arises from two areas within the traditional construction process; the construction work process where the most significant division is in the separation of the design and construction phase, and the construction structure itself. The fragmentation process in traditional contracting practice further hinders the integration of construction knowledge among contractors, diminishing the opportunity for them to influence design decisions. When design professionals fail to consider as to how a contractor would construct the designed project results in scheduling problems, delays, and disputes during the construction process. Moving towards team integration is considered a significant strategy for overcoming the issue. Accordingly, this paper discusses the fragmentation issue in more detail including its definition, and causes and effects to the construction projects. It also explores that the team integration strategy alleviates scheduling problems, and helps avoid delays and disputes during the construction process, preventing harm to overall project performance.

  9. A study of the Bienstock-Zuckerberg algorithm, Applications in Mining and Resource Constrained Project Scheduling

    OpenAIRE

    Muñoz, Gonzalo; Espinoza, Daniel; Goycoolea, Marcos; Moreno, Eduardo; Queyranne, Maurice; Rivera, Orlando

    2016-01-01

    We study a Lagrangian decomposition algorithm recently proposed by Dan Bienstock and Mark Zuckerberg for solving the LP relaxation of a class of open pit mine project scheduling problems. In this study we show that the Bienstock-Zuckerberg (BZ) algorithm can be used to solve LP relaxations corresponding to a much broader class of scheduling problems, including the well-known Resource Constrained Project Scheduling Problem (RCPSP), and multi-modal variants of the RCPSP that consider batch proc...

  10. Evolution of project planning tools in a matrix organization

    Energy Technology Data Exchange (ETDEWEB)

    Furaus, J.P.; Figueroa-McInteer, C.; McKeever, P.S.; Wisler, D.B. [Sandia National Labs., Albuquerque, NM (United States); Zavadil, J.T. [Infomatrix (United States)

    1996-10-01

    Until recently, the Corporate Construction Program at Sandia was experiencing difficulties in managing projects: poor planning and cost estimating caused schedule and budget problems. The first step taken was a Microsoft {reg_sign} Project schedule that provides a standard template for scheduling individual construction projects. It is broken down according to the life cycle of the project and prevents the project team from leaving out an important item. A WBS (work breakdown structure) dictionary was also developed that describes how capital and operating funds are used to develop, design, construct, equip, and manage projects. We also developed a matrix chart that maps the planning guide against the major types of construction projects at Sandia. The guide, dictionary, and matrix chart offer enough flexibility that the project manager can make choices about how to structure work, yet ensure that all work rolls up to the cost categories and key DOE WBS elements. As requirements change, the tools can be updated; they also serve as training tools for new project team members.

  11. Schedule evolution during the life-time of the LHC project

    CERN Document Server

    Foraz, K; Gaillard, H; Hauviller, Claude; Weisz, S

    2007-01-01

    The Large Hadron Collider Project was approved by the CERN Council in December 1994. The CERN management opted from the beginning of the project for a very aggressive installation planning based on a just-in-time sequencing of all activities. This paper aims to draw how different factors (technical development, procurement, logistics and organization) have impacted on the schedule evolution through the lifetime of the project. It describes the cause effect analysis of the major rescheduling that occurred during the installation of the LHC and presents some general conclusions potentially applicable in other projects.

  12. Optimization and control methods in industrial engineering and construction

    CERN Document Server

    Wang, Xiangyu

    2014-01-01

    This book presents recent advances in optimization and control methods with applications to industrial engineering and construction management. It consists of 15 chapters authored by recognized experts in a variety of fields including control and operation research, industrial engineering, and project management. Topics include numerical methods in unconstrained optimization, robust optimal control problems, set splitting problems, optimum confidence interval analysis, a monitoring networks optimization survey, distributed fault detection, nonferrous industrial optimization approaches, neural networks in traffic flows, economic scheduling of CCHP systems, a project scheduling optimization survey, lean and agile construction project management, practical construction projects in Hong Kong, dynamic project management, production control in PC4P, and target contracts optimization.   The book offers a valuable reference work for scientists, engineers, researchers and practitioners in industrial engineering and c...

  13. Artificial intelligence for the CTA Observatory scheduler

    Science.gov (United States)

    Colomé, Josep; Colomer, Pau; Campreciós, Jordi; Coiffard, Thierry; de Oña, Emma; Pedaletti, Giovanna; Torres, Diego F.; Garcia-Piquer, Alvaro

    2014-08-01

    The Cherenkov Telescope Array (CTA) project will be the next generation ground-based very high energy gamma-ray instrument. The success of the precursor projects (i.e., HESS, MAGIC, VERITAS) motivated the construction of this large infrastructure that is included in the roadmap of the ESFRI projects since 2008. CTA is planned to start the construction phase in 2015 and will consist of two arrays of Cherenkov telescopes operated as a proposal-driven open observatory. Two sites are foreseen at the southern and northern hemispheres. The CTA observatory will handle several observation modes and will have to operate tens of telescopes with a highly efficient and reliable control. Thus, the CTA planning tool is a key element in the control layer for the optimization of the observatory time. The main purpose of the scheduler for CTA is the allocation of multiple tasks to one single array or to multiple sub-arrays of telescopes, while maximizing the scientific return of the facility and minimizing the operational costs. The scheduler considers long- and short-term varying conditions to optimize the prioritization of tasks. A short-term scheduler provides the system with the capability to adapt, in almost real-time, the selected task to the varying execution constraints (i.e., Targets of Opportunity, health or status of the system components, environment conditions). The scheduling procedure ensures that long-term planning decisions are correctly transferred to the short-term prioritization process for a suitable selection of the next task to execute on the array. In this contribution we present the constraints to CTA task scheduling that helped classifying it as a Flexible Job-Shop Problem case and finding its optimal solution based on Artificial Intelligence techniques. We describe the scheduler prototype that uses a Guarded Discrete Stochastic Neural Network (GDSN), for an easy representation of the possible long- and short-term planning solutions, and Constraint

  14. Multiple R&D projects scheduling optimization with improved particle swarm algorithm.

    Science.gov (United States)

    Liu, Mengqi; Shan, Miyuan; Wu, Juan

    2014-01-01

    For most enterprises, in order to win the initiative in the fierce competition of market, a key step is to improve their R&D ability to meet the various demands of customers more timely and less costly. This paper discusses the features of multiple R&D environments in large make-to-order enterprises under constrained human resource and budget, and puts forward a multi-project scheduling model during a certain period. Furthermore, we make some improvements to existed particle swarm algorithm and apply the one developed here to the resource-constrained multi-project scheduling model for a simulation experiment. Simultaneously, the feasibility of model and the validity of algorithm are proved in the experiment.

  15. Resource Constrained Project Scheduling Subject to Due Dates: Preemption Permitted with Penalty

    Directory of Open Access Journals (Sweden)

    Behrouz Afshar-Nadjafi

    2014-01-01

    Full Text Available Extensive research works have been carried out in resource constrained project scheduling problem. However, scarce researches have studied the problems in which a setup cost must be incurred if activities are preempted. In this research, we investigate the resource constrained project scheduling problem to minimize the total project cost, considering earliness-tardiness and preemption penalties. A mixed integer programming formulation is proposed for the problem. The resulting problem is NP-hard. So, we try to obtain a satisfying solution using simulated annealing (SA algorithm. The efficiency of the proposed algorithm is tested based on 150 randomly produced examples. Statistical comparison in terms of the computational times and objective function indicates that the proposed algorithm is efficient and effective.

  16. Management and integration of engineering and construction activities: Lessons learned from the AP1000{sup R} nuclear power plant China project

    Energy Technology Data Exchange (ETDEWEB)

    McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C. [Westinghouse Electric Company LLC, 1000 Westinghouse Drive, Cranberry Township, PA 16066 (United States)

    2012-07-01

    The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, the organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)

  17. Construction project management handbook : September 2009.

    Science.gov (United States)

    2009-09-01

    The purpose of this Handbook is to provide guidelines for use by public transit agencies (Agencies) undertaking substantial construction : projects, either for the first time or with little prior experience with construction project management. It pr...

  18. Joint optimization scheduling for water conservancy projects in complex river networks

    Directory of Open Access Journals (Sweden)

    Qin Liu

    2017-01-01

    Full Text Available In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi-period and multi-variable joint optimization scheduling model for flood control, drainage, and irrigation. In this model, the number of sluice holes, pump units, and hydropower station units to be opened were used as decision variables, and different optimization objectives and constraints were considered. This model was solved with improved genetic algorithms and verified using the Huaian Water Conservancy Project as an example. The results show that the use of the joint optimization scheduling led to a 10% increase in the power generation capacity and a 15% reduction in the total energy consumption. The change in the water level was reduced by 0.25 m upstream of the Yundong Sluice, and by 50% downstream of pumping stations No. 1, No. 2, and No. 4. It is clear that the joint optimization scheduling proposed in this study can effectively improve power generation capacity of the project, minimize operating costs and energy consumption, and enable more stable operation of various hydraulic structures. The results may provide references for the management of water conservancy projects in complex river networks.

  19. Optimization planning for the construction of the U.S. EPR

    International Nuclear Information System (INIS)

    Phillips, M. K.

    2008-01-01

    As utilities and project developers in the United States embark on a new nuclear plant construction endeavor, the industry must have the confidence and support of all stakeholders. To gain this confidence and support, cost and schedule certainty must be established. Therein lies the challenge. The owner will insist that constructors and suppliers deliver new plants on time and within project budgets. This will be a significant effort given the limited number of qualified equipment and commodity suppliers, and a shortage of experienced craft and supervision. In an effort to manage construction risk and ensure cost and schedule certainty, the AREVA Construction Management Team has lead the development of a construction strategy that includes advanced construction methods and technologies such as 3-D modeling, detailed planning and scheduling, open-top construction, state-of-the-art fabrication practices, specialty transportation and lifting methods, and pre-assembly and modularization, otherwise referred to as construction optimization. Unlike off-shore platforms, industrial process plants, and ships where piping and components can be integrated into the steel building structure, optimized construction of nuclear plants must consider reinforced concrete walls and slabs that serve as the building structure, and provide radiation shielding and containment of nuclear systems. These differences in design and construction require a significantly different analysis approach that is focused on rooms of a building rather than the whole building or plant. This paper will focus on the process developed and currently being implemented by the U.S. EPR (Evolutionary Power Reactor) Construction Team to identify opportunities for optimization and then to evaluate and select the rooms or areas of the plant where pre-assembly or modularization will provide the greatest benefit to construction cost and schedule certainty. Key measures for comparison and selection are critical path

  20. Welcoming high reliability organising in construction management

    NARCIS (Netherlands)

    olde Scholtenhuis, Léon Luc; Doree, Andries G.; Smith, S.D.; Ahiaga-Dagbui, D.D.

    2013-01-01

    To achieve project objectives, construction project managers have to manoeuvre through complex coordination structures. They have to simultaneously deal with limited budgets, tight schedules, demanding stakeholders and a fragmented supply-chain. Despite their extensive coordination efforts, project

  1. a Quadtree Organization Construction and Scheduling Method for Urban 3d Model Based on Weight

    Science.gov (United States)

    Yao, C.; Peng, G.; Song, Y.; Duan, M.

    2017-09-01

    The increasement of Urban 3D model precision and data quantity puts forward higher requirements for real-time rendering of digital city model. Improving the organization, management and scheduling of 3D model data in 3D digital city can improve the rendering effect and efficiency. This paper takes the complexity of urban models into account, proposes a Quadtree construction and scheduling rendering method for Urban 3D model based on weight. Divide Urban 3D model into different rendering weights according to certain rules, perform Quadtree construction and schedule rendering according to different rendering weights. Also proposed an algorithm for extracting bounding box extraction based on model drawing primitives to generate LOD model automatically. Using the algorithm proposed in this paper, developed a 3D urban planning&management software, the practice has showed the algorithm is efficient and feasible, the render frame rate of big scene and small scene are both stable at around 25 frames.

  2. A QUADTREE ORGANIZATION CONSTRUCTION AND SCHEDULING METHOD FOR URBAN 3D MODEL BASED ON WEIGHT

    Directory of Open Access Journals (Sweden)

    C. Yao

    2017-09-01

    Full Text Available The increasement of Urban 3D model precision and data quantity puts forward higher requirements for real-time rendering of digital city model. Improving the organization, management and scheduling of 3D model data in 3D digital city can improve the rendering effect and efficiency. This paper takes the complexity of urban models into account, proposes a Quadtree construction and scheduling rendering method for Urban 3D model based on weight. Divide Urban 3D model into different rendering weights according to certain rules, perform Quadtree construction and schedule rendering according to different rendering weights. Also proposed an algorithm for extracting bounding box extraction based on model drawing primitives to generate LOD model automatically. Using the algorithm proposed in this paper, developed a 3D urban planning&management software, the practice has showed the algorithm is efficient and feasible, the render frame rate of big scene and small scene are both stable at around 25 frames.

  3. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    Science.gov (United States)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  4. Conjoint utility analysis of technical maturity and project progress of construction project

    Directory of Open Access Journals (Sweden)

    Ma Wei

    2016-01-01

    Full Text Available In this paper, taking construction project as the research object, the relationship between the project maturity index calculated by the construction project technical risks with different fine degree and the project progress index is studied, and the equilibrium relationship between the Party A’s utility curve and the Party B’s cost curve of using project maturity index and project progress index as the research variables is analyzed. The results show that, when the construction project technical risk division is more precise, the conjoint utility of the project's technical maturity index and the project progress is higher, and the project’s Party A and Party B two sides are closer to the optimal equilibrium. This shows that the construction project technical risk must be finely divided, and managed and controlled respectively, which will help to improve the conjoint utility of the project Party A and Party B two sides.

  5. A planning and scheduling system for the LHC project

    CERN Document Server

    Bachy, Gérard; Tarrant, M

    1995-01-01

    The purpose of this paper is to present modern ways to manage time, resources and progress in a large-scale project. Over the last ten years, new project management techniques and tools have appeared such as concurrent engineering, Continuous Acquisition Lifecycle Support (CALS) and Engineering Data Management System (EDMS). The world downturn of the early 90s influenced project management: increasing constraints on time and budget and more external direction on spending that, for example, requires sophisticated sub-contracting practises. However, the evolution of the software and hardware market makes project control tools cheaper and easier to use. All project groups want to have their scope of work considered as complete projects and to control them themselves. This has several consequences on project staff behaviour concerning project control, and has to be taken into account in every planning process designed today. The system described will be at the heart of the planning and scheduling procedures issue...

  6. ABWR construction experience in Japan

    International Nuclear Information System (INIS)

    Kawahata, Junichi; Miura, Jun; Saito, Fuyuki; Mori, Hiroya

    2003-01-01

    The construction of Kashiwazaki-Kariwa Nuclear Power Station Unit No. 6 and 7 (K6 and 7) owned by Tokyo Electric Power Company (TEPCO), have been in service since November 1996 and September 1997 respectively, and are the first ABWRs in the world. Hitachi, Ltd. and Toshiba Corporation took part in the projects and achieved safety construction in 52- month schedule from rock inspection to turnover in cooperation with TEPCO and other contractors with broad experience in BWRs. Taking advantage of experience of the Kashiwazaki construction, the ABWR construction methods realize to satisfy with requests from electric power companies and to fit site conditions. The Chubu Electric Power Company's Hamaoka Nuclear Power Station Unit No. 5 (Hamaoka 5) and Hokuriku Electric Power Company's Shika Nuclear Power Station Unit No. 2 (Shika 2), which are ABWRs, completed rock inspection in May 2000 and June 2001 respectively, and are under construction. The ABWR construction methods are proved their validity through four actual construction projects. Safe constructions with the highest quality have been advanced thus further aiming at the introduction of the latest technologies and contributing to reduce plant construction costs and also to shorten schedule. (author)

  7. The Impact of Project Organizational Culture on the Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    Luong Hai Nguyen

    2017-05-01

    Full Text Available Cultural influence has recently received significant attention from academics due to its vital role in the success or failure of a project. In the construction industry, several empirical investigations have examined the influence of culture on project management. The aim of this study is to determine the impact of project organizational culture on the performance of construction projects. A total of 199 completed construction projects in Vietnam with specific data gathering through questionnaires were analyzed. The findings reveal that contractor commitment to contract agreements is the most significant cultural factor affecting project performance. Goal alignment and reliance, contractor commitment, and worker orientation (i.e., commitment to workers contribute to improved overall performance and participant satisfaction. Contractor commitment and cooperative orientation enhance labor productivity, whereas goal alignment and trust and contractor commitment ensure learning performance (i.e., learning from experience. The findings of this study may assist construction professionals in implementing practices that can contribute to the sustainability and success of construction projects.

  8. EPR project construction cost control

    International Nuclear Information System (INIS)

    Duflo, D.; Pouget-Abadie, X.; Dufour, A.; Kauffmann, G.

    2001-01-01

    The EPR project is now managed by EDF in cooperation with the German Utilities. The main engineering activities for this period are related to the preparation of construction project management, deepening of some safety issues, definition of the project technical reference. The EPR project concerns the so-called reference unit, that is an isolated first-off unit, with unit electrical power of about 1500 MW. The construction costs evaluated are those of the nuclear island, the conventional island, site facilities, installation work and the administrative buildings. The EPR project construction cost evaluation method applies to all the equipment installed and commissioned. It requires the availability of a preliminary project detailed enough to identify the bill of quantities. To these quantities are then assigned updated unit prices that are based either on cost bases for similar and recent facilities or taken from request for quotation for similar equipment or result from gains due to contractual conditions benefiting from simplifications in the functional and technical specifications. The input and output data are managed in a model that respects the breakdown on which the evaluation method is based. The structural organization of this method reflects a functional breakdown on the one hand (nuclear island, conventional island, common site elements) and on the other hand a breakdown according to equipment or activity (civil engineering, mechanics, electricity, instrumentation and control). This paper discusses the principle and the method of construction cost evaluation carried out, the cost data base and input and output parameters as well as results and oncoming cost analysis tasks. (author)

  9. Radioactive materials in construction projects

    International Nuclear Information System (INIS)

    Herrmann, Ralf; Ohlendorf, Frank; Kaltz, Andrea Christine

    2014-01-01

    Till 1990 residues often of the former uranium mining were partly used as building material for road construction, terrain compensation and house construction in Saxony. These recommendations for action are addressed to applicants, planners and building constructors in the engineering and construction sector. It provides information for planning, preliminary investigations, applications, construction supervision related to radiation protection measures and documentation of construction projects where radioactive materials are expected.

  10. Project Scheduling Heuristics-Based Standard PSO for Task-Resource Assignment in Heterogeneous Grid

    Directory of Open Access Journals (Sweden)

    Ruey-Maw Chen

    2011-01-01

    Full Text Available The task scheduling problem has been widely studied for assigning resources to tasks in heterogeneous grid environment. Effective task scheduling is an important issue for the performance of grid computing. Meanwhile, the task scheduling problem is an NP-complete problem. Hence, this investigation introduces a named “standard“ particle swarm optimization (PSO metaheuristic approach to efficiently solve the task scheduling problems in grid. Meanwhile, two promising heuristics based on multimode project scheduling are proposed to help in solving interesting scheduling problems. They are the best performance resource heuristic and the latest finish time heuristic. These two heuristics applied to the PSO scheme are for speeding up the search of the particle and improving the capability of finding a sound schedule. Moreover, both global communication topology and local ring communication topology are also investigated for efficient study of proposed scheme. Simulation results demonstrate that the proposed approach in this investigation can successfully solve the task-resource assignment problems in grid computing and similar scheduling problems.

  11. Effect of bond administration on construction project delivery

    Directory of Open Access Journals (Sweden)

    Oke Ayodeji Emmanuel

    2016-12-01

    Full Text Available Construction bond administration involves management of bond issues from inception of obtaining bond from guarantor to the point of release of contractor by the client. This process has posted a lot of challenges to construction stakeholders; it is therefore, necessary to examine the relationship between bond administration and project success. Archival data of completed bonded building projects were gathered through a pro forma developed for this purpose. Using Pearson product moment of correlation, it was revealed that the cost of securing a construction bond has a positive and significant effect on the initial and final costs of the project, while the number of days needed to secure a construction bond has no significant effect on the initial and final durations of the construction project. In order to establish the relationship between project delivery indices of cost and time and the construction bond administration variables, iteration of linear regression was adopted to arrive at the best-fit equation. Factors affecting the cost of securing construction bonds from guarantors should be identified and given adequate attention by construction stakeholders in order to minimize the effect of construction bond administration on project delivery.

  12. Project scheduling with resources constraints: application in the equipment production for the oil industry; Scheduling de projetos com restricao de recursos: aplicacao na producao de equipamentos para a industria de petroleo

    Energy Technology Data Exchange (ETDEWEB)

    Cruz, Carolina A.O.; Ferreira Filho, Virgilio J.M. [Universidade Federal do Rio de Janeiro (UFRJ), Rio de Janeiro, RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia (COPPE)

    2008-07-01

    One of the essential steps in the main scope Project Management is the Time Management made by the planning and control of the project schedule. In this work is presented the resource constrained scheduling problem beyond its mathematical formulation and a review of papers about this issue. In sequence is presented a practical example of this model considering a simplified model of an engineering project schedule of oil production equipment. The results obtained with the model application are shown and the conclusions about the work with resource constrained scheduling problems. (author)

  13. Application of value engineering technique in construction project

    International Nuclear Information System (INIS)

    Chen Changbing

    2003-01-01

    The author introduces how to apply the theories and methods of the value engineering in construction project. In the construction of a test device of the thermal hydrodynamic process, the authors have greatly reduced the construction cost and shortened the construction period by using the value engineering analyzing method. The application of value engineering in the project management is innovative. This practice indicates that the value engineering is important in many construction projects

  14. Updating Linear Schedules with Lowest Cost: a Linear Programming Model

    Science.gov (United States)

    Biruk, Sławomir; Jaśkowski, Piotr; Czarnigowska, Agata

    2017-10-01

    Many civil engineering projects involve sets of tasks repeated in a predefined sequence in a number of work areas along a particular route. A useful graphical representation of schedules of such projects is time-distance diagrams that clearly show what process is conducted at a particular point of time and in particular location. With repetitive tasks, the quality of project performance is conditioned by the ability of the planner to optimize workflow by synchronizing the works and resources, which usually means that resources are planned to be continuously utilized. However, construction processes are prone to risks, and a fully synchronized schedule may expire if a disturbance (bad weather, machine failure etc.) affects even one task. In such cases, works need to be rescheduled, and another optimal schedule should be built for the changed circumstances. This typically means that, to meet the fixed completion date, durations of operations have to be reduced. A number of measures are possible to achieve such reduction: working overtime, employing more resources or relocating resources from less to more critical tasks, but they all come at a considerable cost and affect the whole project. The paper investigates the problem of selecting the measures that reduce durations of tasks of a linear project so that the cost of these measures is kept to the minimum and proposes an algorithm that could be applied to find optimal solutions as the need to reschedule arises. Considering that civil engineering projects, such as road building, usually involve less process types than construction projects, the complexity of scheduling problems is lower, and precise optimization algorithms can be applied. Therefore, the authors put forward a linear programming model of the problem and illustrate its principle of operation with an example.

  15. Project management a systems approach to planning, scheduling, and controlling

    CERN Document Server

    Kerzner, Harold

    2017-01-01

    Project Management is the bestselling text for students and professionals, presenting a streamlined approach to project management functions in full alignment with PMI(r)'s latest Project Management Body of Knowledge (PMBOK(r)). This new 12th edition has been updated to reflect the latest changes found in the PMBOK(r) Guide--Sixth Edition, and features new coverage of emerging topics including global stakeholder management, causes of failure, agile project management, project governance failure, customer approval milestones, classifying project metrics, and more. Supplementary materials are available for students, working professionals, and instructors. * Understand organizational structures and project management functions * Learn how to control costs, manage risk, and analyze trade-offs * Examine different methods used for planning, scheduling, QA, and more * Work effectively with customers and stakeholders from around the globe Project Management is the comprehensive reference to keep within arm's reach. ...

  16. An examination of fuel consumption trends in construction projects

    International Nuclear Information System (INIS)

    Peters, Valerie A.; Manley, Dawn K.

    2012-01-01

    Recent estimates of fuel consumption in construction projects are highly variable. Lack of standards for reporting at both the equipment and project levels make it difficult to quantify the magnitude of fuel consumption and the associated opportunities for efficiency improvements in construction projects. In this study, we examined clusters of Environmental Impact Reports for seemingly similar construction projects in California. We observed that construction projects are not characterized consistently by task or equipment. We found wide variations in estimates for fuel use in terms of tasks, equipment, and overall projects, which may be attributed in part to inconsistencies in methodology and parameter ranges. Our analysis suggests that standardizing fuel consumption reporting and estimation methodologies for construction projects would enable quantification of opportunities for efficiency improvements at both the equipment and project levels. With increasing emphasis on reducing fossil fuel consumption, it will be important to quantify opportunities to increase fuel efficiency, including across the construction sector. - Highlights: ► An analysis of construction projects reveals inconsistencies in fuel use estimates. ► Fuel consumption estimates for similar construction equipment can vary greatly. ► Standards would help to quantify efficiency opportunities in construction.

  17. Environmental standards and project construction: A review

    International Nuclear Information System (INIS)

    Mason, P.F.; Thornberry, H.L.

    1991-01-01

    In the past decade, changes have occurred in the area of environmental regulation. This paper identifies the typical environmental standards applicable to project construction, recent environmental regulatory issues and trends, and identifies new environmental issues which must be considered in project construction. These include (1) handling hazardous chemicals in the workplace, (2) construction at formerly utilized sites, (3) disposal of debris, construction materials and hazardous waste, and (4) training and experience of construction personnel in environmental issues

  18. Stochastic project networks temporal analysis, scheduling and cost minimization

    CERN Document Server

    Neumann, Klaus

    1990-01-01

    Project planning, scheduling, and control are regularly used in business and the service sector of an economy to accomplish outcomes with limited resources under critical time constraints. To aid in solving these problems, network-based planning methods have been developed that now exist in a wide variety of forms, cf. Elmaghraby (1977) and Moder et al. (1983). The so-called "classical" project networks, which are used in the network techniques CPM and PERT and which represent acyclic weighted directed graphs, are able to describe only projects whose evolution in time is uniquely specified in advance. Here every event of the project is realized exactly once during a single project execution and it is not possible to return to activities previously carried out (that is, no feedback is permitted). Many practical projects, however, do not meet those conditions. Consider, for example, a production process where some parts produced by a machine may be poorly manufactured. If an inspection shows that a part does no...

  19. Shuffled Frog Leaping Algorithm for Preemptive Project Scheduling Problems with Resource Vacations Based on Patterson Set

    Directory of Open Access Journals (Sweden)

    Yi Han

    2013-01-01

    Full Text Available This paper presents a shuffled frog leaping algorithm (SFLA for the single-mode resource-constrained project scheduling problem where activities can be divided into equant units and interrupted during processing. Each activity consumes 0–3 types of resources which are renewable and temporarily not available due to resource vacations in each period. The presence of scarce resources and precedence relations between activities makes project scheduling a difficult and important task in project management. A recent popular metaheuristic shuffled frog leaping algorithm, which is enlightened by the predatory habit of frog group in a small pond, is adopted to investigate the project makespan improvement on Patterson benchmark sets which is composed of different small and medium size projects. Computational results demonstrate the effectiveness and efficiency of SFLA in reducing project makespan and minimizing activity splitting number within an average CPU runtime, 0.521 second. This paper exposes all the scheduling sequences for each project and shows that of the 23 best known solutions have been improved.

  20. Exploring delay causes of road construction projects in

    Directory of Open Access Journals (Sweden)

    Remon F. Aziz

    2016-06-01

    Full Text Available Construction delays are a common phenomenon in civil engineering projects in Egypt including road construction projects. Therefore, it is essential to study and analyze causes of road construction delays. This paper studied a list of construction delay causes gathered from literature having different types of construction, different countries, different periods and different numbers of delay causes and delay groups. A questionnaire and personal interviews have formed the basis of this paper listing 293 delay causes. The questionnaire survey was distributed to 500 construction participants and 389 were received who represent consultants, contractors and site/design engineers excluding the owner representing the government in road projects as one party only. Relative Importance Index (RII is calculated and according to the highest values the top twenty and the least twenty delay causes of construction projects in Egypt are determined. A case study is analyzed and compared to the most important delay causes in the paper. The test results reveal good correlation of causes and groups between contractors and site/design engineers and between consultants and site design engineers and a somewhat low correlation between contractors and consultants. So there are no root causes that can be taking for granted to be most or least effective delay causes. Proposed model for predicting actual road construction project duration was developed; a real case study tested the accuracy of proposed model. According to the analysis of case study, the most contributing causes and groups to delays were discussed, and some future recommendations were proposed in order to control and minimize delays in road construction projects. These findings can be helpful for project managers to mitigate the road construction delays in Egypt. In order to effectively overcome the road construction delays in developing countries, suggestions are made for fundamental and large

  1. Review of Time Management for the Research Reactor Project

    Energy Technology Data Exchange (ETDEWEB)

    Park, Kook-Nam; Park, Su-Jin; Choi, Min-Ho; Yoon, Hyung-Mo; Kim, Hyeonil [KAERI, Daejeon (Korea, Republic of); Lee, Eung-Jae [DAEWOO E and C, Seoul (Korea, Republic of)

    2016-05-15

    In this paper, the processes for the time management, which have actually been implemented for JRTR, are presented. In JRTR, a master schedule was submitted in December 2012 whereas the project was contracted in October 2010. The schedule includes fixing the Engineering Deliverable List (EDL), the list of equipment, the actual issue date, the results of Primavera, a piece of software to manage progress, the progress rate and the issuance of the schedule based on the Project level III. Afterwards JAEC approved to the extension of the schedule from 56 months to 70.5 months mainly due to late preparation of the Jordanian nuclear legislative system. The project schedule was updated up to the fifth revision to compensate the delay by recovering measures such as for design, purchase, construction, and finally the owner of the project, Jordanian Atomic Energy Commission (JAEC) approved in August 2014. Construction work, the prerequisite for commissioning stage A had been finished in February 2016, and commissioning stage A has been being performed.

  2. Review of Time Management for the Research Reactor Project

    International Nuclear Information System (INIS)

    Park, Kook-Nam; Park, Su-Jin; Choi, Min-Ho; Yoon, Hyung-Mo; Kim, Hyeonil; Lee, Eung-Jae

    2016-01-01

    In this paper, the processes for the time management, which have actually been implemented for JRTR, are presented. In JRTR, a master schedule was submitted in December 2012 whereas the project was contracted in October 2010. The schedule includes fixing the Engineering Deliverable List (EDL), the list of equipment, the actual issue date, the results of Primavera, a piece of software to manage progress, the progress rate and the issuance of the schedule based on the Project level III. Afterwards JAEC approved to the extension of the schedule from 56 months to 70.5 months mainly due to late preparation of the Jordanian nuclear legislative system. The project schedule was updated up to the fifth revision to compensate the delay by recovering measures such as for design, purchase, construction, and finally the owner of the project, Jordanian Atomic Energy Commission (JAEC) approved in August 2014. Construction work, the prerequisite for commissioning stage A had been finished in February 2016, and commissioning stage A has been being performed

  3. Project Leadership and Quality Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    SPG Buba

    2017-05-01

    Full Text Available Background: The construction industry in Nigeria, is pigeonholed by poor quality of construction products as a result of the inherent corruption in the country. Lack of purposeful leadership and inappropriate choice of leadership styles in the industry have been attributed to project failure. Abandoned and failed projects are more predominant in the public sector which litters every corner of the country. Objectives: The objective of this paper is to assess the impact of leadership styles on quality performance criteria of public projects in Nigeria. Methodology: A total of 43 questionnaires were distributed to 3 key groups of respondents (Quantity Surveyors, Builders, and Architects who are project managers in Nigeria. Descriptive and Inferential statistics were used to analyse the data using the Statistical Package for Social Sciences (SPSS. Likert Scale was used to measure the independent variables (leadership style: facilitative, coaching, delegating and directing; and the level of achievement of projects based on the dependent variables (quality and function performance criteria which are: achieving highest aesthetic quality; and functional building that fits its purpose. Findings: The study revealed that Directing is the major leadership style used by project managers in Nigeria. Amongst the leadership styles which has the most impact on quality performance indicators is also directing which has the most relative influence on achieving highest aesthetic quality and functional building that fits its purpose. Conclusion/Recommendation/Way forward: The underlying relationship between Directing leadership styles and the performance criteria of achieving highest aesthetic quality and functional building that fits its purpose will be beneficial to the Nigerian construction environment.

  4. Complex engineering objects construction using Multi-D innovative technology

    International Nuclear Information System (INIS)

    Agafonov, Alexey

    2013-01-01

    Multi-D technology is an integrated innovative project management system for a construction of complex engineering objects based on a construction process simulation using an intellectual 3D model. Multi-D technology includes: • The unified schedule of E+P+C; • The schedule of loading of human resources, machines & mechanisms; • The budget of expenses and the income integrated with the schedule; • 3D model; • Multi-D model; • Weekly-daily tasks (with 4th level schedules); • Control system of interaction of Customer-EPC(m) company - Contractors; • Change and configuration management system

  5. Leadership Quality for Malaysia Construction Leader to Steer a Success Construction Project

    Directory of Open Access Journals (Sweden)

    Ngah Nasaruddin Nur Ain

    2016-01-01

    Full Text Available Issues that dominate the construction industry for the long time such as time overrun, cost overrun, quality of construction and also safety during the construction process are difficult to resolve because of several factors involved which amongst them are leadership quality in the industry. Solving these issues can make the industry more sustainable in nature. This paper presents the need of leadership quality among construction parties involved to steer a construction project successfully. Literature work found that 11 leadership qualities to ensure construction project success. From the frequency analysis, five most dominant leadership qualities are team building, communication skill, visioning, planning & strategy skill, and decision making. Beside the literature, this study also seeks an opinion from a senior leader of a successful construction company regarding the need of these qualities amongst parties to resolve the construction issues. The results from an interview session indicate that he fully agreed with the need of all the qualities in the construction industry. This shows that there is a strong relationship between solving the issues with the leadership quality in ensuring construction project success. These qualities should be further investigated to acquire a better representation of leadership quality in resolving construction issues for Malaysia construction industry.

  6. Project Robust Scheduling Based on the Scattered Buffer Technology

    Directory of Open Access Journals (Sweden)

    Nansheng Pang

    2018-04-01

    Full Text Available The research object in this paper is the sub network formed by the predecessor’s affect on the solution activity. This paper is to study three types of influencing factors from the predecessors that lead to the delay of starting time of the solution activity on the longest path, and to analyze the influence degree on the delay of the solution activity’s starting time from different types of factors. On this basis, through the comprehensive analysis of various factors that influence the solution activity, this paper proposes a metric that is used to evaluate the solution robustness of the project scheduling, and this metric is taken as the optimization goal. This paper also adopts the iterative process to design a scattered buffer heuristics algorithm based on the robust scheduling of the time buffer. At the same time, the resource flow network is introduced in this algorithm, using the tabu search algorithm to solve baseline scheduling. For the generation of resource flow network in the baseline scheduling, this algorithm designs a resource allocation algorithm with the maximum use of the precedence relations. Finally, the algorithm proposed in this paper and some other algorithms in previous literature are taken into the simulation experiment; under the comparative analysis, the experimental results show that the algorithm proposed in this paper is reasonable and feasible.

  7. A computer based approach for Material, Manpower and Equipment managementin the Construction Projects

    Science.gov (United States)

    Sasidhar, Jaladanki; Muthu, D.; Venkatasubramanian, C.; Ramakrishnan, K.

    2017-07-01

    The success of any construction project will depend on efficient management of resources in a perfect manner to complete the project with a reasonable budget and time and the quality cannot be compromised. The efficient and timely procurement of material, deployment of adequate labor at correct time and mobilization of machinery lacking in time, all of them causes delay, lack of quality and finally affect the project cost. It is known factor that Project cost can be controlled by taking corrective actions on mobilization of resources at a right time. This research focuses on integration of management systems with the computer to generate the model which uses OOM data structure which decides to include automatic commodity code generation, automatic takeoff execution, intelligent purchase order generation, and components of design and schedule integration to overcome the problems of stock out. To overcome the problem in equipment management system inventory management module is suggested and the data set of equipment registration number, equipment number, description, date of purchase, manufacturer, equipment price, market value, life of equipment, production data of the equipment which includes equipment number, date, name of the job, hourly rate, insurance, depreciation cost of the equipment, taxes, storage cost, interest, oil, grease, and fuel consumption, etc. is analyzed and the decision support systems to overcome the problem arising out improper management is generated. The problem on labor is managed using scheduling, Strategic management of human resources. From the generated support systems tool, the resources are mobilized at a right time and help the project manager to finish project in time and thereby save the abnormal project cost and also provides the percentage that can be improved and also research focuses on determining the percentage of delays that are caused by lack of management of materials, manpower and machinery in different types of projects

  8. Schedule of the nuclear program

    International Nuclear Information System (INIS)

    Heigl, F.

    1977-01-01

    The lecure tries to explain the main phases which must be passed to establish nuclear power plants, the feasibility phase, preconstruction and construction phase. Each phase consists of a lot of activities which are commented. Further the lecture tries to give some ideas of durances and dependence between the phases or activities to get a complete time schedule of the realization of a nuclear power project. (HP) [de

  9. A Case Study of Line-of-Balance based Schedule Planning and Control System

    OpenAIRE

    Seppänen, Olli; Aalto, Erno

    2005-01-01

    Line-of-Balance is a graphical technique which can be used to plan and manage work flow. It is suit-able for construction projects because of their large degree of repetition. Despite its strengths Line-of-Balance has not gained widespread use in construction industry internationally. However, it has been used as the principal scheduling tool in Finland since 1980s. As a result of two decades of research and use in industry, a comprehensive schedule planning and control system has been develo...

  10. Solid Waste Operations Complex W-113: Project cost estimate. Preliminary design report. Volume IV

    International Nuclear Information System (INIS)

    1995-01-01

    This document contains Volume IV of the Preliminary Design Report for the Solid Waste Operations Complex W-113 which is the Project Cost Estimate and construction schedule. The estimate was developed based upon Title 1 material take-offs, budgetary equipment quotes and Raytheon historical in-house data. The W-113 project cost estimate and project construction schedule were integrated together to provide a resource loaded project network

  11. NASA Schedule Management Handbook

    Science.gov (United States)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  12. A QUADTREE ORGANIZATION CONSTRUCTION AND SCHEDULING METHOD FOR URBAN 3D MODEL BASED ON WEIGHT

    OpenAIRE

    C. Yao; G. Peng; Y. Song; M. Duan

    2017-01-01

    The increasement of Urban 3D model precision and data quantity puts forward higher requirements for real-time rendering of digital city model. Improving the organization, management and scheduling of 3D model data in 3D digital city can improve the rendering effect and efficiency. This paper takes the complexity of urban models into account, proposes a Quadtree construction and scheduling rendering method for Urban 3D model based on weight. Divide Urban 3D model into different rendering weigh...

  13. Preliminary analysis of projected construction employment effects of building the defense waste processing facility at the Savannah River Plant

    International Nuclear Information System (INIS)

    Garey, R.B.; Blair, L.M.; Craig, R.L.; Stevenson, W.

    1981-09-01

    This study estimates the probable effects of constructing the DWPF on the surrounding labor markets. Analyses are based on data from the local and regional labor markets, information from experts on local construction activities, information on the labor requirements of the Vogtle Power Plant (two nuclear reactors) being built by Georgia Power Company in Burke County, Georgia, and an econometric model of the construction labor market, based on several surveys of workers building three Tennessee Valley Authority nuclear power plants. The results of this study are reported in three parts. In Part I, completed in May 1980, we describe the 1979 (base year) employment levels within the local and regional labor markets surrounding SRP, from which most DWPF construction workers are likely to be drawn. In Part II, completed in June 1980, we define the four local sources of construction employment that will compete for craftsmen when DWPF is built. Also in Part II, most of the projected impacts of the DWPF reference immobilization alternative (one of several alternatives that may be chosen) are reported. Several construction schedules and labor demand scenarios for the reference alternative are considered. In Part III, completed in January 1981, most of the estimated impacts of the DWPF alternative referred to as the staged process alternative are reported. Several construction schedules and labor demand scenarios for this alternative are considered

  14. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  15. Risk management in public sector construction projects: Case ...

    African Journals Online (AJOL)

    a project environment. Since projects are complicated, experience ... work, delays trigger cost overruns in construction projects (African. Development Bank ..... quantity surveying, contract management, and engineering. Table 4: Research ..... professionals at the business and operational levels of construction management.

  16. Construction Worker Fatigue Prediction Model Based on System Dynamic

    OpenAIRE

    Wahyu Adi Tri Joko; Ayu Ratnawinanda Lila

    2017-01-01

    Construction accident can be caused by internal and external factors such as worker fatigue and unsafe project environment. Tight schedule of construction project forcing construction worker to work overtime in long period. This situation leads to worker fatigue. This paper proposes a model to predict construction worker fatigue based on system dynamic (SD). System dynamic is used to represent correlation among internal and external factors and to simulate level of worker fatigue. To validate...

  17. Exploitation and Benefits of BIM in Construction Project Management

    Science.gov (United States)

    Mesároš, Peter; Mandičák, Tomáš

    2017-10-01

    BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.

  18. Benchmarking Sustainability Practices Use throughout Industrial Construction Project Delivery

    Directory of Open Access Journals (Sweden)

    Sungmin Yun

    2017-06-01

    Full Text Available Despite the efforts for sustainability studies in building and infrastructure construction, the sustainability issues in industrial construction remain understudied. Further, few studies evaluate sustainability and benchmark sustainability issues in industrial construction from a management perspective. This study presents a phase-based benchmarking framework for evaluating sustainability practices use focusing on industrial facilities project. Based on the framework, this study quantifies and assesses sustainability practices use, and further sorts the results by project phase and major project characteristics, including project type, project nature, and project delivery method. The results show that sustainability practices were implemented higher in the construction and startup phases relative to other phases, with a very broad range. An assessment by project type and project nature showed significant differences in sustainability practices use, but no significant difference in practices use by project delivery method. This study contributes to providing a benchmarking method for sustainability practices in industrial facilities projects at the project phase level. This study also discusses and provides an application of phase-based benchmarking for sustainability in industrial construction.

  19. Methodology of project management at implementation of projects of high-rise construction

    Science.gov (United States)

    Papelniuk, Oksana

    2018-03-01

    High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.

  20. Construction Project Leadership from the Perspective of Islam

    OpenAIRE

    MUHAMAD ROSDI SENAM; KHAIRUDDIN ABDUL RASHID; AZILA AHMAD SARKAWI; RAPIAH MOHD. ZAINI

    2014-01-01

    Construction industry is continuously being accused with common issues such as low performance, corruptions, spillages, bad practices in addition to common project failures despite advances in project management tools and techniques. This further adds to the existing and increasing complex and multi-facets business environment in construction projects that has resulted in the increasing pressure and challenges faced by project leaders and project managers today. Researchers in project managem...

  1. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    Science.gov (United States)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of

  2. Technology Management on Large Construction Projects

    DEFF Research Database (Denmark)

    Bonke, Sten

    The aim of this text is to discuss and to develop the concept of technology management in relation to the empirical field of construction projects. In the first of the two main sections central theories and their derived assertions concerning technology management criteria are summed up...... Fixed Link construction project. Finally on this basis the concluding remarks are pointing to the main theoretical problems and their practical implementations for the introduction of a technology management discipline in construction....... in a schematic theoretical framework. Hereafter the general characteristics of construction are examined from the point of view of serving as an empirical field for technology management analysis. In the second section the technology management theme is associated with the empirical properties of the Great Belt...

  3. Bi-project management in engineering complex industrial construction projects

    NARCIS (Netherlands)

    Velde, Robert R. van der; Donk, Dirk Pieter van

    2000-01-01

    Engineering large industrial construction projects is usually a complex task with several co-operating actors. This paper investigates such projects, characterised by two main actors: the owner of the installation (the client organisation) responsible for the engineering of the production process,

  4. Optimizing strategy for repetitive construction projects within multi-mode resources

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-03-01

    Full Text Available Estimating tender data for specific project is the most essential part in construction areas as of a contractor’s view such as: proposed project duration with corresponding gross value and cash flows. Cash flow analysis of construction projects has a long history and has been an important topic in construction management. Determination of project cash flows is very sensitive, especially for repetitive construction projects. This paper focuses on how to calculate tender data for repetitive construction projects such as: project duration, project cost, project/bid price, project cash flows, project maximum working capital and project net present value that is equivalent to net profit at the beginning of the project. A simplified multi-objective optimization formulation will be presented that creates best tender data to contractor comparing with more feasible options that are generated from multi-mode resources in a given project. This mathematical formulation is intended to give more scenarios which provide a practical support for typical construction contractors who need to optimize resource utilization in order to minimize project duration, project/bid price and project maximum working capital while maximizing its net present value simultaneously. At the end of the paper, an illustrative example will be presented to demonstrate the applications of proposed technique to an optimization expressway of repetitive construction project.

  5. Factors influencing cost over-run in Indian construction projects

    Directory of Open Access Journals (Sweden)

    Cindrela Devi A.

    2017-01-01

    Full Text Available Construction cost is the most important criteria of project success and hence the construction project performance is generally expressed in terms of cost and its variance from the budget. In spite of having extant literature, cost estimation methods, cost indices etc., construction projects rarely meet the budgeted cost. This research study focuses on the construction cost overrun and to identify the various factors that affects the construction cost performance. Based on an extensive literature review and input from industry experts, sixty eight factors that causes cost overrun were identified for investigation. Further, a structured questionnaire survey was conducted among the industry experts and the collected data has been analysed statistically. It is concluded that the factors namely scope creep, construction delays, rework and practise of awarding the contract to the lowest bidder are most significant factors for construction cost overrun in non-infrastructural Indian projects. The relative importance of the listed factors used to guide the project team in addressing the cost related risks involved in the projects. The findings are expected to bridge the gap in the current construction cost management practices.

  6. Informal worker phenomenon in housing construction project

    Science.gov (United States)

    Wijayaningtyas, Maranatha; Sipan, Ibrahim; Lukiyanto, Kukuh

    2017-11-01

    The informal workers phenomenon on housing construction projects in Indonesia is different from workers in other sectors who would always request as permanent employees. Substantively, the informal workers are disinclined to be bound as permanent employees which different from the general labor paradigm. Hence, the objective of this study is to find out how the labour selection process, the factors that affected their performance, and the suitable wage system to achieve the target completion of housing construction project. The qualitative method is used to uncover and understand the meaning behind the phenomena (numina) of informal workers action and their influence on housing construction project which called phenomenological approach. Five informal workers and two project managers were selected as informants based on predetermined criteria with in-depth interviews. The results showed that the informal worker were more satisfied with the wage based on unit price while working in the housing construction project for the flexibility in working hours. In addition, the developer was also relieved because they only control the quality and the achievement of the project completion time which supported by informal worker leader. Therefore, these findings are beneficial for both of developer and government as policy maker to succeed the housing program in Indonesia.

  7. Construction Project Leadership from the Perspective of Islam

    Directory of Open Access Journals (Sweden)

    MUHAMAD ROSDI SENAM

    2014-12-01

    Full Text Available Construction industry is continuously being accused with common issues such as low performance, corruptions, spillages, bad practices in addition to common project failures despite advances in project management tools and techniques. This further adds to the existing and increasing complex and multi-facets business environment in construction projects that has resulted in the increasing pressure and challenges faced by project leaders and project managers today. Researchers in project management literature calls for more project leadership research as leadership now is increasingly recognised as project success factor. Ethical dilemma and leadership crisis facing the project managers and business organisations reveals the shortcomings and inadequacies of the conventional non-Islamic leadership that is believed to be or that has not fully considered the religious, spiritual, moral and ethical dimensions. Examples of these theories of leadership are authentic leadership, servant leadership and ethical leadership. Therefore, recent trend from literature has implicitly suggested a new form of leadership for construction project manager which is spiritual, moral, values and ethical form of leadership. The uniqueness of Islam is that it does not separate religion and other aspects of human life activities. Construction and project activities are part of the whole economic and social transactions of a nation and thus it is part of Islam. Project management in particular leadership awaits divine intervention that is tied to God consciousness and accords with values and principles prescribed in the Quran and Sunnah. This research is intended to overcome the spiritual and religious shortcomings of the present leadership models by proposing an Islamic perspective of leadership for construction project manager.

  8. Analyzing delay causes in Egyptian construction projects

    Directory of Open Access Journals (Sweden)

    Mohamed M. Marzouk

    2014-01-01

    Full Text Available Construction delays are common problems in civil engineering projects in Egypt. These problems occur frequently during project life-time leading to disputes and litigation. Therefore, it is essential to study and analyze causes of construction delays. This research presents a list of construction delay causes retrieved from literature. The feedback of construction experts was obtained through interviews. Subsequently, a questionnaire survey was prepared. The questionnaire survey was distributed to thirty-three construction experts who represent owners, consultants, and contractor’s organizations. Frequency Index, Severity Index, and Importance Index are calculated and according to the highest values of them the top ten delay causes of construction projects in Egypt are determined. A case study is analyzed and compared to the most important delay causes in the research. Statistical analysis is carried out using analysis of variance ANOVA method to test delay causes, obtained from the survey. The test results reveal good correlation between groups while there is significant difference between them for some delay causes and finally roadmap for prioritizing delay causes groups is presented.

  9. Management of the interfaces between construction and startup

    International Nuclear Information System (INIS)

    Anderson, W.R.; Beatty, D.C.

    1976-01-01

    Many papers have been presented, and many articles published on the various tasks of Nuclear Plant Design, Construction, Startup and Operations. Most of the presentations have been concerned with the complexities of the particular task being discussed. This is as it should be, since these areas are quite broad in themselves and deserve the full attention of the technology. Recently more attention is being directed to the interfaces between the classical portions of nuclear projects. The paper attempts to address just one of these areas: the interfaces between construction and startup. These interfaces have normally been addressed to the extent that engineering schedules, construction schedules, equipment deliveries and startup test schedules have been dovetailed graphically, or computerized, and periodically updated to reflect significant changes

  10. MULTIPLE PROJECT MANAGEMENT IN THE CONSTRUCTION INDSUTRY

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-06-01

    Full Text Available The field of project management has historically focused on the administration of one project at a time, a focus that is insufficient given the growing need for organizations to manage multiple projects simultaneously. The requirements of Multiple Project Management (MPM involves demands and practices that are different from those of single projects. MPM poses a special need for coordination of shared resources across multiple projects in a way that can maintain the firm’s strategic focus and facilitate effective decision making. The construction industry is noteworthy for its frequent need for the management of multiple projects. This paper offers a review of the last five years of indexed literature related to multiple project management in the construction industry, identifies gaps and suggests promising new avenues of inquiry.

  11. EVMS for nuclear power plant construction: status and implementation

    International Nuclear Information System (INIS)

    Roh, M. S.; Kwak, J. K.; Park, S. Y.

    2012-01-01

    The Earned Value Management System (EVMS) method integrates three critical elements of project management scope, cost and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments and allows calculation of cost and schedule variances along with performance indices. It allows for casting of project cost and schedule at completion and highlights the possible need for corrective action. It is anticipated that there will be intense competition in the nuclear industry as the cost and time for nuclear power plant construction. In order to attain competitive advantages, utilizing advanced project control systems by integrating cost and time management is of great concern for practitioners. This paper is to review the status of EVMS and its effective implementation to nuclear power plant construction

  12. Solving a mixed-integer linear programming model for a multi-skilled project scheduling problem by simulated annealing

    Directory of Open Access Journals (Sweden)

    H Kazemipoor

    2012-04-01

    Full Text Available A multi-skilled project scheduling problem (MSPSP has been generally presented to schedule a project with staff members as resources. Each activity in project network requires different skills and also staff members have different skills, too. This causes the MSPSP becomes a special type of a multi-mode resource-constrained project scheduling problem (MM-RCPSP with a huge number of modes. Given the importance of this issue, in this paper, a mixed integer linear programming for the MSPSP is presented. Due to the complexity of the problem, a meta-heuristic algorithm is proposed in order to find near optimal solutions. To validate performance of the algorithm, results are compared against exact solutions solved by the LINGO solver. The results are promising and show that optimal or near-optimal solutions are derived for small instances and good solutions for larger instances in reasonable time.

  13. The construction project manager in South Africa: Analysis of ...

    African Journals Online (AJOL)

    Journal Home > Vol 22, No 1 (2015) > ... Construction project managers in the built environment come from various backgrounds and knowledge bases; therefore, the project managers' project ... Industry-specific guidelines for construction project management (PMBOK and SACPCMP) were obtained and analysed.

  14. Labor construction trends

    International Nuclear Information System (INIS)

    McCall, H.W.

    1976-01-01

    The increasing costs and schedule delays being experienced in construction projects have led companies to look for alternatives to their present methods of expansion. One of the facets being evaluated is the construction labor posture. As a result, more companies are employing open shop contractors. Certain benefits can be realized by open shop construction. Productivity, in terms of the time required and overall costs, is definitely improved at no sacrifice in quality. Before an owner decides to build a project open shop, however, he must be fully aware of the pro's and con's of both types of labor posture. He must know to select a capable open shop contractor and he must realize his obligations for a successful open shop program

  15. Ranking the Project Management Success Factors for Construction Project in South India

    Science.gov (United States)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  16. Appendix VI: KHNP staffing plan of construction site office: ULCHIN 5 and 6 construction project (ROK)

    International Nuclear Information System (INIS)

    2008-01-01

    KHNP, as an owner/operator organization, is responsible for all project activities including design, procurement, construction, and commissioning, for Korea's nuclear power plant (NPP) construction projects. Four separate functional offices of KHNP are set up to complete the construction management work. These offices are (1) home office, (2) field construction office, (3) field quality assurance office, and (4) field startup/commissioning office. This paper presents a staffing plan for the field construction office starting initial project implementation to final turnover to operations stages. It is recognized that the plan may not be applicable to other utility situations in terms of project management of site activity depending upon how the overall project contract is structured

  17. Prioritizing and scheduling Portsmouth Gaseous Diffusion Plant safeguards upgrades

    International Nuclear Information System (INIS)

    Edmunds, T.; Saleh, R.; Zevanove, S.

    1992-02-01

    As part of the Site Safeguards and Security Plan (SSSP), facilities are required to develop a Resource Plan (RP). The Resource Plan provides documentation and justification for the facility's planned upgrades, including the schedule, priority, and cost estimates for the safeguards and security upgrades. Portsmouth Gaseous Diffusion Plant (PORTS) management has identified and obtained funding approval for a number of safeguards and security upgrades, including line-item construction projects. These upgrade projects were selected to address a variety of concerns identified in the PORTS vulnerability assessments and other reviews performed in support of the SSSP process. However, budgeting and scheduling constraints do not make it possible to simultaneously begin implementation of all of the upgrade projects. A formal methodology and analysis are needed to explicitly address the trade-offs between competing safeguards objectives, and to prioritize and schedule the upgrade projects to ensure that the maximum benefit can be realized in the shortest possible time frame. The purpose of this report is to describe the methodology developed to support these upgrade project scheduling decisions. The report also presents the results obtained from applying the methodology to a set of the upgrade projects selected by PORTS S ampersand S management. Data for the analysis are based on discussions with personnel familiar with the PORTS safeguards and security needs, the requirements for implementing these upgrades, and upgrade funding limitations. The analysis results presented here assume continued highly enriched uranium (HEU) operations at PORTS. However, the methodology developed is readily adaptable for the evaluation of other operational scenarios and other resource allocation issues relevant to PORTS

  18. Integrated project scheduling and staff assignment with controllable processing times.

    Science.gov (United States)

    Fernandez-Viagas, Victor; Framinan, Jose M

    2014-01-01

    This paper addresses a decision problem related to simultaneously scheduling the tasks in a project and assigning the staff to these tasks, taking into account that a task can be performed only by employees with certain skills, and that the length of each task depends on the number of employees assigned. This type of problems usually appears in service companies, where both tasks scheduling and staff assignment are closely related. An integer programming model for the problem is proposed, together with some extensions to cope with different situations. Additionally, the advantages of the controllable processing times approach are compared with the fixed processing times. Due to the complexity of the integrated model, a simple GRASP algorithm is implemented in order to obtain good, approximate solutions in short computation times.

  19. Integrated Project Scheduling and Staff Assignment with Controllable Processing Times

    Directory of Open Access Journals (Sweden)

    Victor Fernandez-Viagas

    2014-01-01

    Full Text Available This paper addresses a decision problem related to simultaneously scheduling the tasks in a project and assigning the staff to these tasks, taking into account that a task can be performed only by employees with certain skills, and that the length of each task depends on the number of employees assigned. This type of problems usually appears in service companies, where both tasks scheduling and staff assignment are closely related. An integer programming model for the problem is proposed, together with some extensions to cope with different situations. Additionally, the advantages of the controllable processing times approach are compared with the fixed processing times. Due to the complexity of the integrated model, a simple GRASP algorithm is implemented in order to obtain good, approximate solutions in short computation times.

  20. Management of delayed nuclear power plant projects

    International Nuclear Information System (INIS)

    2005-01-01

    The IAEA assists the management of organizations responsible for Nuclear Power Plant Projects with significant delays with respect to the originally scheduled commercial operation. Several Member States have Nuclear Power Plant Projects with delays of five or more years with respect to the originally scheduled commercial operation. The degree of conformance with original construction schedules shows large variations due to several issues, including financial, economic and public opinion factors. Solving the special difficulties related with a delayed NPP project is problematic and dependent on the particular country situation. However it is not regarded as an isolated national problem but as a significant issue with a number of difficulties shared by several Member States. The IAEA collects information and supports the management of delayed NPP projects by identifying main common issues, gathering available experience and addressing specific needs. On this background the IAEA is in the position to provide unique impartial assistance based upon best international practices. This enables Member States to maintain readiness for resuming the project construction when the conditions permit and to strengthen management's abilities for the completion of the project. The IAEA's service is tailored to the needs and requirements of the requesting organization, implemented on-site by international experts and addresses areas such as project control measures, human resources, updating to technological and regulatory requirements, project data, nuclear safety review, physical protection and nuclear security and preparation to resume project construction and operation

  1. Analysis of critical paths for schedule control of nuclear power projects

    International Nuclear Information System (INIS)

    Shi Liangmin; Ma Limin; Fan Kai

    2005-01-01

    Study on the critical paths for the schedule control of nuclear power projects has been performed for reactor M310, based on the experiences from Daya Bay project and Ling Ao project. The study shows that the critical paths for the nuclear power project are from NI civil work, NI erection, commissioning of single systems directly serving the CFT to the joint-test. For NI civil work, the critical path is the main civil work of the reactor building, pre-stressing, handover of rooms for important areas, and key CW-erection interfaces; there are four critical paths for NI erection; For startup, two stages can be identified: commissioning of 16 single systems directly serving the CFT and joint-test. (authors)

  2. BPA review of Washington Public Power Supply System, Projects 1 and 3 (WNP 1 and 3), construction schedule and financing assumptions

    International Nuclear Information System (INIS)

    1984-01-01

    This document contains the following appendices: Data provided By Supply System Regarding Costs and Schedules; Basic Supply System Data and Assumptions; Detailed Modeling of Net Present Values; Origin and Detailed Description of the System Analysis Mode; Decision Analysis Model; Pro Forma Budget Expenditure Levels for Fiscal years 1984 through 1990; Financial Flexibility Analysis - Discretionary/Nondiscretionary Expenditure Levels; Detailed Analysis of BPA's Debt Structure Under the 13 Pro Forma Budget Scenarios for Fiscal Years 1984 through 1990; Wertheim and Co., Inc., August 30, 1984 Letter; Project Considerations and Licensing/Regulatory Issues, Supply System September 15, 1984 Letter; and Summary of Litigation Affecting WNP 1 and 3, and WNP 4 and 5

  3. Implementation of lean construction techniques for minimizing the risks effect on project construction time

    Directory of Open Access Journals (Sweden)

    Usama Hamed Issa

    2013-12-01

    Full Text Available The construction projects involve various risk factors which have various impacts on time objective that may lead to time-overrun. This study suggests and applies a new technique for minimizing risk factors effect on time using lean construction principles. The lean construction is implemented in this study using the last planner system through execution of an industrial project in Egypt. Evaluating the effect of using the new tool is described in terms of two measurements: Percent Expected Time-overrun (PET and Percent Plan Completed (PPC. The most important risk factors are identified and assessed, while PET is quantified at the project start and during the project execution using a model for time-overrun quantification. The results showed that total project time is reduced by 15.57% due to decreasing PET values, while PPC values improved. This is due to minimizing and mitigating the effect of most of the risk factors in this project due to implementing lean construction techniques. The results proved that the quantification model is suitable for evaluating the effect of using lean construction techniques. In addition, the results showed that average value of PET due to factors affected by lean techniques represents 67% from PET values due to all minimized risk factors.

  4. A Framework for Coordination Process into Construction Projects

    Directory of Open Access Journals (Sweden)

    Alaloul Wesam S.

    2016-01-01

    Full Text Available Construction industry is recognized as high fragmentation, low efficiency, cost and time overruns in contrast with other industries. These peculiarities are the main roots of poor performance facing by the industry. Effective coordination is vital in construction projects success and mitigate the fragmentation dilemma, however it is often difficult to achieve and need iterative process. Coordination is core issue to improve performance in construction project. Relevant studies have addressed the coordination process importance and implementation, but not in a framework. This paper propose a framework for coordination process in construction projects, as well as its relationship with performance. The objective of the framework is to provide a roadmap for the construction parties to realize operational excellence so that collectively stakeholders can recognize the effect of coordination process application on the project performance. The data were obtained from literature review and structured interviews with five experts. The analysis produced the framework of coordination based on the extensively used procedures for information and data flow between stakeholders.

  5. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  6. Construction Management of Electromechanical Engineering Project in Petrochemical Construction

    Directory of Open Access Journals (Sweden)

    Xi Tao

    2017-03-01

    Full Text Available Petrochemical industry as a basic industry, occupies a pivotal position in the national economy, with the continuous development of science and technology, electromechanical automation in the petrochemical industry has been widely used to save a lot of labor but also greatly improve the oil Chemical industry production efficiency. Therefore, in the construction of petrochemical industry, mechanical and electrical engineering as part of it. It plays a vital role. Petrochemical industry with the production of high temperature and high pressure and flammable and explosive gas, can strengthen the construction of mechanical and electrical engineering specialization and construction management of scientific, has become the relationship between the smooth development of mechanical and electrical engineering and engineering quality of the key, A direct impact on the petrochemical construction of the overall construction quality. To this end, it is necessary for the construction of petrochemical construction of electromechanical engineering construction management to promote the construction of mechanical and electrical engineering management level gradually increased. This article on the machine Electric engineering project construction management were discussed with a view to the petrochemical construction in the relevant aspects of the need to provide reference for reference.

  7. 41 CFR 102-80.75 - Who assesses environmental issues in Federal construction and lease construction projects?

    Science.gov (United States)

    2010-07-01

    ... environmental issues in Federal construction and lease construction projects? 102-80.75 Section 102-80.75 Public... Management Assessment of Environmental Issues § 102-80.75 Who assesses environmental issues in Federal construction and lease construction projects? Federal agencies must assess required environmental issues...

  8. Methodology for construction compliance monitoring in the crediting of investment projects for road construction

    Science.gov (United States)

    Vaynshtok, Natalia

    2017-10-01

    The article provides the results of development of the methodology for construction compliance monitoring in the crediting of investment projects for road construction. Work scope analysis of construction audit was conducted and an algorithm of financial audit in the crediting investment projects was developed. Furthermore, the possible pitfalls and abuses of counterparties were investigated and recommendations were given allowing the bank to receive objective and independent information on the progress of the project in real time. This mechanism is useful for the bank in insurance of possible risks, targeted and rational use of credit funds.

  9. Project management best practices: forging win-win partnerships and mitigating power project risk

    International Nuclear Information System (INIS)

    Trowsdale, R.

    2006-01-01

    This paper discusses aspects of project management to mitigate power project risk. end-to-end project development involves development phase, permitting phase, implementation phase, and operational phase. Each phase involves a number of different elements. In renewable energy project good management requires maintaining project discipline and schedule throughout all phases. Project success requires commercial competitiveness, fuel availability, power sales contracts, stake holder support, permitting, effective execution, construction and good technical performance

  10. Knowledge Management Practice on Construction Project ...

    African Journals Online (AJOL)

    Likewise, the results further indicated 19 benefits of KM practice for improving construction project performance and include: improve project quality, cost and time; practice and process improvement; encourage effective teamwork and innovation; improve the client satisfaction; boost productivity of employees and processes; ...

  11. 7 CFR 1726.403 - Project construction contract closeout.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Project construction contract closeout. 1726.403... § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on... American” certificate. (iii) RUS Form 224, Waiver and Release of Lien, from each manufacturer, supplier...

  12. Solving Multi-Resource Constrained Project Scheduling Problem using Ant Colony Optimization

    Directory of Open Access Journals (Sweden)

    Hsiang-Hsi Huang

    2015-01-01

    Full Text Available This paper applied Ant Colony Optimization (ACO to develop a resource constraints scheduling model to achieve the resource allocation optimization and the shortest completion time of a project under resource constraints and the activities precedence requirement for projects. Resource leveling is also discussed and has to be achieved under the resource allocation optimization in this research. Testing cases and examples adopted from the international test bank were studied for verifying the effectiveness of the proposed model. The results showed that the solutions of different cases all have a better performance within a reasonable time. These can be obtained through ACO algorithm under the same constrained conditions. A program was written for the proposed model that is able to automatically produce the project resource requirement figure after the project duration is solved.

  13. Causes of Low-Skilled Workers’ Performance in Construction Projects

    OpenAIRE

    Alhaji Ali Zannah; Aryani Ahmad Latiffi; Abdulazeez Umar Raji; Abdullahi Abba Waziri; Usman Mohammed 4

    2017-01-01

    Skilled workers’ performance is one of the crucial aspects of labour productivity that requires proper attention for effective projects delivery in the construction industry. The level of skilled workers’ low performance has been seen to be a major factor which contributes toward inefficient construction projects productivity. Therefore, the objective of this research is to identify the causes of low-skilled workers’ performance in construction projects in the Nigeria. The objective was achie...

  14. 42 CFR 137.362 - May construction project agreements be amended?

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May construction project agreements be amended? 137... of the Secretary in Establishing and Implementing Construction Project Agreements § 137.362 May construction project agreements be amended? Yes, the Self-Governance Tribe, at its discretion, may request the...

  15. A model for scheduling projects under the condition of inflation and under penalty and reward arrangements

    Directory of Open Access Journals (Sweden)

    J.K. Jolayemi

    2014-01-01

    Full Text Available A zero-one mixed integer linear programming model is developed for the scheduling of projects under the condition of inflation and under penalty and reward arrangements. The effects of inflation on time-cost trade-off curves are illustrated and a modified approach to time-cost trade-off analysis presented. Numerical examples are given to illustrate the model and its properties. The examples show that misleading schedules and inaccurate project-cost estimates will be produced if the inflation factor is neglected in an environment of high inflation. They also show that award of penalty or bonus is a catalyst for early completion of a project, just as it can be expected.

  16. The Qinshan phase III project-a successful model of sino-canadian cooperation

    International Nuclear Information System (INIS)

    Pang, S.H.H.; Alikhan, S.; Gu Jun

    2005-01-01

    The Qinshan Phase III (CANDU) Project, the largest-scale cooperative project between China and Canada, was completed in 2003 well in advance of the schedule and 10% under budget. The Third Qinshan (Phase III) Nuclear Power Plant (TQNPP) was built in record times: Unit 1 achieved commercial operation on December 31, 2002 and Unit 2 on July 20, 2003, 43 days and 115 days ahead of schedule respectively. Improvements in design and construction methods allowed Unit 1 to be constructed in 51.5 months from First Concrete to Criticality - a record in China for nuclear power plants. The key factors are project management and project management tools, quality assurance, construction methods, electronic documentation with configuration control that provides up-to-date on-line information, CADDS design linked with material management and control. New design and construction techniques were introduced by combining conventional AECL practices with working experiences in China. The most advanced tools and techniques for achieving optimum construction quality, schedule and cost were used. Successful application of advanced project management methods and tools has benefited TQNPC in its subsequent plant operation, and the Chinese contractors in advancing their capabilities in future nuclear projects in China as well as enhancing their opportunities internationally. Excellent co-operation and teamwork within the integrated TQNPC/AECL Commissioning Team with well documented QA program, process and procedures also contributed to the remarkable success of the Project. AECL's initial assessment, based on lessons learned, showed that the project schedule could readily be reduced to 66 months and the capital costs reduced by 25% for a replication project. AECL is building on this experience and successful results of TQNPP in its Advanced CANDU Reactor TM (ACR TM ) ** design. (authors)

  17. Waste diminution in Construction projects: Environmental Predicaments

    Science.gov (United States)

    Gharehbaghi, Koorosh; Scott-Young, Christina

    2018-03-01

    Waste diminution in construction projects is not only a behavioural issue, but also an energy consumption and reduction concern. With construction waste equating to the significant amount of exhausted energy together with increased pollution, this contributes to a series of environmental predicaments. The overall goal of construction solid Waste Management is to collect, treat and dispose of solid wastes generated by project activities in an environmentally and socially satisfactory manner, using the most economical means available. As cities expand, their construction activities and consumption patterns further drive up the solid waste quantities. Governments are usually authorized to have responsibility for providing solid Waste Management services, and various administrative laws give them exclusive ownership over the waste produced. In addition, construction waste processing can be further controlled and minimized according to specialized authorities such as Environmental Protection Agencies (EPA) and their relevant acts and regulations. Moreover, a Construction Environmental Management Plan (CEMP) can further control the treatment of waste and therefore, reduce the amount produced. Key elements of a CEMP not only include complying with relevant legislation, standards and guidance from the EPA; however, also to ensuring that there are systems in place to resolve any potential problems associated with site activities. Accordingly, as a part of energy consumption and lessening strategies, this paper will discuss various effective waste reduction methods for construction projects. Finally, this paper will also examine tactics to further improve energy efficiency through innovative construction Waste Management strategies (including desirability rating of most favourable options) to promote the lessening of overall CO2production.

  18. Project Management Techniques

    OpenAIRE

    Mihalache Anita; Salagean Liana

    2010-01-01

    Project management is a technique that can aid in the planning, scheduling, and monitoring of complex projects characterized by numerous, non repetitive jobs called activities. Examples of projects that would use project management include: - developing a mass rapid – transit system for a metropolitan area; - organizing the relocation of a corporate headquarters; - planning the production of a concert, film, or play; - developing and marketing a new automobile; - constructing a high – rise of...

  19. Leadership Quality for Malaysia Construction Leader to Steer a Success Construction Project

    OpenAIRE

    Ngah Nasaruddin Nur Ain; Abdul Rahman Ismail

    2016-01-01

    Issues that dominate the construction industry for the long time such as time overrun, cost overrun, quality of construction and also safety during the construction process are difficult to resolve because of several factors involved which amongst them are leadership quality in the industry. Solving these issues can make the industry more sustainable in nature. This paper presents the need of leadership quality among construction parties involved to steer a construction project successfully. ...

  20. Application of 3D CADDS model to design and engineering for constructability improvement

    International Nuclear Information System (INIS)

    Cho, U.Y.; Park, C.C.; Choy, E.

    1998-01-01

    The use of three dimensional (3D) computer-aided design and drafting system (CADDS) model along with the associated information management system in engineering phases of large projects is well established and yielding significant improvements in project cost, schedule and quality. The information contained in these models can also be utilized in plant construction site for construction schedule review, installation procedure review, interference check, and visual communication tool to the utility owner when the visual and spatial information contained in the 3D models is integrated with other plant information. This paper will describe the application of 3D models and the associated databases in the construction process of CANDU HWR heavy water reactors. Some examples on the use of 3D CADD models in CANDU projects will be presented

  1. Construction of special structures for nuclear power projects

    International Nuclear Information System (INIS)

    Raghavan, N.

    2003-01-01

    Construction is a very important stage in the course of realization of Nuclear Power Projects and as much care has be devoted to this stage as to the planning and engineering stages. While the setting up of nuclear power projects used to take over seven years in the past, the time period has now been considerably reduced to about five years with advancements in construction engineering, project management and design techniques, on the basis of new initiatives from the owner agency, Nuclear Power Corporation of India. In this article, the constructional aspects of the specialized structures for nuclear power generation are looked into. (author)

  2. Leveraging Text Content for Management of Construction Project Documents

    Science.gov (United States)

    Alqady, Mohammed

    2012-01-01

    The construction industry is a knowledge intensive industry. Thousands of documents are generated by construction projects. Documents, as information carriers, must be managed effectively to ensure successful project management. The fact that a single project can produce thousands of documents and that a lot of the documents are generated in a…

  3. Assessing Environmental Impact Indicators in Road Construction Projects in Developing Countries

    Directory of Open Access Journals (Sweden)

    Mohamed Marzouk

    2017-05-01

    Full Text Available Environmental pollution is considered to be one of the main concerns in the construction industry. Environmental pollution has become a major challenge to construction projects due to the huge amount of pollution caused by construction projects. There are different types of environmental impact indicators, such as the greenhouse gas (GHG footprint, eutrophication potential (EP, acidification potential (AP, human health (HH particulate, ozone depletion, and smog. Each of these environmental impact indicators can be linked to different phases of the construction projects. The overall environmental impact indicators can be divided into direct, indirect, and operational emissions. This paper presents a Building Information Modeling (BIM-based methodology for the assessment of environmental impacts in road construction projects. The model takes into account the overall life cycle of the road construction project, which is divided into: manufacturing phase, transportation phase, construction phase, maintenance phase, operational phase, recycling phase, and deconstruction phase. A case study is presented to demonstrate the applicability of the proposed model. The proposed model solves a major problem for road construction project teams who want to assess the environmental impact indicators associated with their project prior to the start of the execution of their projects.

  4. Quality Management System at Construction Project: A Questionnaire Survey

    OpenAIRE

    P.P.Mane; J.R.Patil

    2015-01-01

    The best quality, time and cost are the important aspects of successful construction project which fulfills the main goal of construction industry. The quality management has to provide the environment within which related tools, techniques and procedures can be deployed effectively leading to operational success for a construction project. The role of quality management for a construction company is not an isolated activity, but intertwined with all the operational and managerial...

  5. 42 CFR 137.327 - May multiple projects be included in a single construction project agreement?

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May multiple projects be included in a single construction project agreement? 137.327 Section 137.327 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.327 May multiple projects be included in a single...

  6. Practical tips for dealing with office construction and repair.

    Science.gov (United States)

    Hills, Laura Sachs

    2008-01-01

    Many medical practices embark on a large office construction project sooner or later. When they do, the medical practice staff often finds itself up to its eyeballs in dust, debris, and confusion. This article suggests practical strategies for the medical practice staff to help employees cope with the inevitable challenges before, during, and after an office construction project. It suggests a strategy for a staff kick-off meeting and for establishing staff to-do lists throughout the project. It offers 10 practical staff strategies before the project begins including doing preparatory work with patients and neighbors and establishing a chain of communication. The article also offers tips for ensuring safety during office construction and ways to use a construction project as a springboard for goodwill-building and practice-marketing activities. Finally, this article offers advice about maintaining the daily schedule of the practice during a large-scale office construction project.

  7. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Keywords: Communication skills and leadership model, construction project ..... help a manager handle stress and break tension (Gido & Clements,. 2012: 331; Harrin .... production and management of projects, the higher the demand for.

  8. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD. INTEGRATED DISPOSAL FACILITY (IDF)

    International Nuclear Information System (INIS)

    MCLELLAN, G.W.

    2007-01-01

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal issues as well as challenges with

  9. Project control of WENDELSTEIN 7-X

    International Nuclear Information System (INIS)

    Buende, R.; Gottschewsky, M.; Heinrich, S.

    2001-01-01

    WENDELSTEIN 7-X (W7-X) is an experimental stellarator presently under construction at the new branch of IPP Garching at Greifswald. Since its beginning in 1996, the project W7-X Construction has been incorporating a comprehensive project control activity to assure the plant is constructed according to schedule and budget. The working fields of the project control--organization, planning and controlling--are described together with the relevant boundary conditions of the project. The activities in these fields are highlighted and an overview of the status of the project is given with emphasis on the components on the time-critical path. As conclusions some important issues for the future of the project are specified

  10. Nuclear power project construction quality acceptance standards Implementation and discussion

    International Nuclear Information System (INIS)

    Lai Shifu

    2013-01-01

    Project quality construction acceptance is an important element of nuclear power project quality management. Based on characteristics of NPP construction and refer to national construction quality acceptance code and industry regulation, this paper introduces and discusses NPP construction quality acceptance regulation improvement and implementation under current situation. (authors)

  11. Expansive Learning in Construction Projects - a Contradiction in terms?

    DEFF Research Database (Denmark)

    Klitgaard, Anne; Nissen, Søren Bülow; Beck, Frederikke

    2016-01-01

    This research is a preliminary study performed as part of a primary research into expansive learning in interorganizational network set up to solve a construction project. The construction industry has long had issues about productivity, which can be an indication of lack of learning. A case study...... acquisition and participation but not by expansive learning. The construction industry needs to accept that the learning generated from projects will be limited to learning by acquisition and participation. The interorganizational network cannot facilitate expansive learning while working on object......-fixed projects. Research in construction management fails to generate and document knowledge because of the limitations of case studies....

  12. Spent nuclear fuel project integrated schedule plan

    International Nuclear Information System (INIS)

    Squires, K.G.

    1995-01-01

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel

  13. Spent nuclear fuel project integrated schedule plan

    Energy Technology Data Exchange (ETDEWEB)

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  14. Exploitation of cloud computing in management of construction projects in Slovakia

    Directory of Open Access Journals (Sweden)

    Mandičák Tomáš

    2016-12-01

    Full Text Available The issue of cloud computing is a highly topical issue. Cloud computing represents a new model for information technology (IT services based on the exploitation of Web (it represents a cloud and other application platforms, as well as software as a service. In general, the exploitation of cloud computing in construction project management has several advantages, as demonstrated by several research reports. Currently, research quantifying the exploitation of cloud computing in the Slovak construction industry has not yet been carried out. The article discusses the issue of exploitation of cloud computing in construction project management in Slovakia. The main objective of the research is to confirm whether factors such as size of construction enterprise, owner of construction enterprise and participant of construction project have any impact on the exploitation level of cloud computing in construction project management. It includes confirmation of differences in use between different participants of the construction project or between construction enterprises broken down by size and shareholders.

  15. Risk Management in Construction Project: Taking Fairness into Account

    Science.gov (United States)

    Górecki, Jarosław; Bizon-Górecka, Jadwiga

    2017-10-01

    Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises

  16. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, H.; Skutella, M.; Woeginger, Gerhard

    2003-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  17. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Skutella, M.; Woeginger, G.J.; Paterson, M.

    2000-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  18. 78 FR 18348 - Submission for OMB Review; Use of Project Labor Agreements for Federal Construction Projects

    Science.gov (United States)

    2013-03-26

    ...: There is no existing Governmentwide data base that collects PLAs and specifically the number submitted... Project Labor Agreements for Federal Construction Projects AGENCY: Department of Defense (DOD), General... information collection requirement regarding Use of Project Labor Agreements for Federal Construction Projects...

  19. Using Coevolution Genetic Algorithm with Pareto Principles to Solve Project Scheduling Problem under Duration and Cost Constraints

    Directory of Open Access Journals (Sweden)

    Alexandr Victorovich Budylskiy

    2014-06-01

    Full Text Available This article considers the multicriteria optimization approach using the modified genetic algorithm to solve the project-scheduling problem under duration and cost constraints. The work contains the list of choices for solving this problem. The multicriteria optimization approach is justified here. The study describes the Pareto principles, which are used in the modified genetic algorithm. We identify the mathematical model of the project-scheduling problem. We introduced the modified genetic algorithm, the ranking strategies, the elitism approaches. The article includes the example.

  20. Client's constraining factors to construction project management ...

    African Journals Online (AJOL)

    This study analyzed client's related factors that constrain project management success of public and private sector construction in Nigeria. Issues that concern clients in any project can not be undermined as they are the owners and the initiators of project proposals. It is assumed that success, failure or abandonment of ...

  1. Project orie:nta.teci pla.:n:ni:ng, scheduling a.:nci controlling technique

    African Journals Online (AJOL)

    Review Technique. By October 1958 it ... (CPM) to schedule and control a very large project. and during the ... objectives are identified and the total job is broken down into ..... jobs in a single shop or shops in the plant, to scheduf- ing plants ...

  2. Factors influencing the motivation and productivity of craftsmen and foremen on large construction projects

    International Nuclear Information System (INIS)

    Garner, D.F.; Borcherding, J.D.; Samelson, N.M.

    1979-08-01

    Substantial cost overruns and schedule delays are traits of the power plant construction industry, specifically the young and controversial nuclear power plant construction industry. These cost and schedule overruns are having a significant effect on the economic feasibility of many power plants, and the future energy supply network of our country may have to be restructured in light of these overruns. A major cause of cost overruns is related to the declining rate of productivity of workers. Marjatta Strandell, an engineering and construction expert for the Pacific Power and Light Company, Portland, Oregon, reports that since 1970 craft productivity in nuclear and fossil-fuel power plant construction has been decreasing at an average annual rate of four percent. The cumulative effect of this indicates that, by 1980, the craft productivity would be a mere sixty percent of the 1970 craft productivity

  3. Measuring the effects of using ICT/BIM in construction projects

    DEFF Research Database (Denmark)

    Lambrecht, Jan Fuglsig; Vestergaard, Flemming; Karlshøj, Jan

    2016-01-01

    This paper focuses on presenting part of the findings from a research project completed in the period of 2009-2013.The research project was funded by the Danish Building & Property Agency with the primary aim to identify and measure the economic effects of using ICT/BIM in construction projects....... Firstly, this paper presents a conceptual evaluation method developed in order to define and describe how case studies focusing on use of ICT/BIM in construction projects could be completed in order to measure (both quantitatively and qualitatively) the effects achieved from using ICT/BIM in construction...... projects. In this context effects are defined both as tangible and intangible effects (both economically and non-economically) directly and/or indirectly as a consequence of using ICT/BIM in a construction project. Secondly, the paper presents and analyses findings achieved from completing four case...

  4. Construction Project Performance Improvement through Radio Frequency Identification Technology Application on a Project Supply Chain

    Science.gov (United States)

    Wang, Heng

    2017-01-01

    Construction project productivity typically lags other industries and it has been the focus of numerous studies in order to improve the project performance. This research investigated the application of Radio Frequency Identification (RFID) technology on construction projects' supply chain and determined that RFID technology can improve the…

  5. A Priority Rule-Based Heuristic for Resource Investment Project Scheduling Problem with Discounted Cash Flows and Tardiness Penalties

    Directory of Open Access Journals (Sweden)

    Amir Abbas Najafi

    2009-01-01

    Full Text Available Resource investment problem with discounted cash flows (RIPDCFs is a class of project scheduling problem. In RIPDCF, the availability levels of the resources are considered decision variables, and the goal is to find a schedule such that the net present value of the project cash flows optimizes. In this paper, we consider a new RIPDCF in which tardiness of project is permitted with defined penalty. We mathematically formulated the problem and developed a heuristic method to solve it. The results of the performance analysis of the proposed method show an effective solution approach to the problem.

  6. Planning and scheduling - A schedule's performance

    International Nuclear Information System (INIS)

    Whitman, N.M.

    1993-01-01

    Planning and scheduling is a process whose time has come to PSI Energy. With an awareness of the challenges ahead, individuals must look for ways to enhance the corporate competitiveness. Working toward this goal means that each individual has to dedicate themselves to this more competitive corporate environment. Being competitive may be defined as the ability of each employee to add value to the corporation's economic well being. The timely and successful implementation of projects greatly enhances competitiveness. Those projects that do not do well often suffer from lack of proper execution - not for lack of talent or strategic vision. Projects are consumers of resources such as cash and people. They produce a return when completed and will generate a better return when properly completed utilizing proven project management techniques. Completing projects on time, within budget and meeting customer expectations is the way a corporation builds it's future. This paper offers suggestions on implementing planning and scheduling and provides a review of results in the form of management reports

  7. The spirit of St. Lucie: nuclear plant built on schedule

    International Nuclear Information System (INIS)

    Derrickson, W.B.

    1984-01-01

    Florida Power and Light Company currently has four nuclear units in operation with St. Lucie Unit 2 being the last to receive an operating license in June, 1983. It's sister Unit 1 received its license in 1976 and has, through 1982, compiled one of the best operating records in the United States. The full power license for St. Lucie Unit 2 was received from the Nuclear Regulatory Commission (NRC) on June 10, 1983, just six years after construction began. The industry average for construction of nuclear plants in this time period is about 10 years. The success of the St. Lucie Unit 2 project can be at least in part attributed to planning the work, accurate and timely reporting of results via valid indicators, well trained and skilled personnel, and most of all, teamwork. During the course of the project the plant was constantly on or near schedule and always ahead of industry averages. This was done despite issuance of numerous regulations by the NRC (TMI), a 1979 hurricane which did considerable damage to the Reactor Auxiliary Building, labor problems, and an NRC schedule review team that determined the best that could be done was to complete the plant a year later. The final price tag is about $1.42 billion, including ''allowance for funds used during construction''. In operation to date the post core loading test program has been completed in less than two months, enabling the plant to be put into commercial operation only two months after its original scheduled date of May 28, 1983exclamation

  8. Ranking of delay factors in construction projects after Egyptian revolution

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-09-01

    Full Text Available Time is one of the major considerations throughout project management life cycle and can be regarded as one of the most important parameters of a project and the driving force of project success. Time delay is a very frequent phenomenon and is almost associated with nearly all constructing projects. However, little effort has been made to curtail the phenomenon, this research work attempts to identify, investigate, and rank factors perceived to affect delays in the Egyptian construction projects with respect to their relative importance so as to proffer possible ways of coping with this phenomenon. To achieve this objective, researcher invited practitioners and experts, comprising a statistically representative sample to participate in a structured questionnaire survey. Brain storming was taken into consideration, through which a number of delay factors were identified in construction projects. Totally, ninety-nine (99 factors were short-listed to be made part of the questionnaire survey and were identified and categorized into nine (9 major categories. The survey was conducted with experts and representatives from private, public, and local general construction firms. The data were analyzed using Relative Importance Index (RII, ranking and simple percentages. Ranking of factors and categories was demonstrated according to their importance level on delay, especially after 25/1/2011 (Egyptian revolution. According to the case study results, the most contributing factors and categories (those need attention to delays were discussed, and some recommendations were made in order to minimize and control delays in construction projects. Also, this paper can serve as a guide for all construction parties with effective management in construction projects to achieve a competitive level of quality and a time effective project.

  9. DECISION SUPPORT CONCEPT TO MANAGEMENT OF CONSTRUCTION PROJECTS - PROBLEM OF CONSTRUCTION SITE SELECTION

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2013-02-01

    Full Text Available The aim of this paper is to present Decision Support Concept (DSC for management of construction projects. Focus of our research is in application of multicritera methods (MCM to decision making in planning phase of construction projects (related to the problem of construction sites selection. The problem is identified as a significant one from many different aspects such as economic aspect, civil engineering aspect, etc. what indicates the necessity for evaluation of multiple sites by several different criteria. Therefore, DSC for construction site selection based on PROMETHEE method is designed. In order to define the appropriate criteria, their weights and preference functions for the concept, three groups of stakeholders are involved (investors, construction experts and experts for real estate market in its design. AHP method has been used for determination of criteria weights. The model has been tested on the problem of site selection for construction of residential-commercial building in four largest cities in Croatia.

  10. The communication in industrialised building system (IBS) construction project: Virtual environment

    Science.gov (United States)

    Pozin, Mohd Affendi Ahmad; Nawi, Mohd Nasrun Mohd

    2017-10-01

    Large portion of numbers team organization in the IBS construction sector is known are being fragmented. That is contributed from a segregation of construction activity thus create team working in virtually. Virtual team are the nature when teams are working in distributed area, across culture and time. Therefore, teams can be respond to the task without relocating to the site project and settle down a problem through information and communication technology (ICT). The emergence of virtual team are carry out by advancements in communication technologies as a medium to improve project team communication in project delivery process on IBS construction. Based on literature review from previous study and data collected from interviewing, this paper aim to identified communication challenges among project team members according to current project development practices in IBS construction project. Hence, in attempt to develop effective communication through the advantages of virtual team approach for IBS construction project. In order to ensure the data is gathered comprehensively and accurately, the data was collected from project managers by using semi structured interview method. It was found that virtual team approach could be enable competitive challenges on complexity in the construction project management process.

  11. Quality assurance in the Antares laser fusion construction project

    International Nuclear Information System (INIS)

    Reichelt, W.H.

    1984-01-01

    The Antares CO 2 laser facility came on line in November 1983 as an experimental physics facility; it is the world's largest CO 2 laser fusion system. Antares is a major component of the Department of Energy's Inertial Confinement Fusion Program. Antares is a one-of-a-kind laser system that is used in an experimental environment. Given limited project funds and tight schedules, the quality assurance program was tailored to achieve project goals without imposing oppressive constraints. The discussion will review the Antares quality assurance program and the utility of various portions to completion of the project

  12. An Algorithm for the Weighted Earliness-Tardiness Unconstrained Project Scheduling Problem

    Science.gov (United States)

    Afshar Nadjafi, Behrouz; Shadrokh, Shahram

    This research considers a project scheduling problem with the object of minimizing weighted earliness-tardiness penalty costs, taking into account a deadline for the project and precedence relations among the activities. An exact recursive method has been proposed for solving the basic form of this problem. We present a new depth-first branch and bound algorithm for extended form of the problem, which time value of money is taken into account by discounting the cash flows. The algorithm is extended with two bounding rules in order to reduce the size of the branch and bound tree. Finally, some test problems are solved and computational results are reported.

  13. Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419

    Energy Technology Data Exchange (ETDEWEB)

    Hulett, David T. [Hulett and Associates, LLC (United States); Nosbisch, Michael R. [Project Time and Cost, Inc. (United States)

    2012-07-01

    This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost, and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution proceeds

  14. Portfolio management for investment projects in the construction industry

    Directory of Open Access Journals (Sweden)

    Kozlov Alexander

    2017-01-01

    Full Text Available The Russian business community has realized the need for project/targeted programme management procedures; therefore, the demand for customized project-oriented management methods goes up. In the meantime, this demand is not supplied in full, and the supply is far from being efficient. Project management methodologies need further improvement, including development of portfolio management processes applicable to investment projects developed and implemented in the construction industry. The article considers General approaches to the formalization of the management of portfolios of investment–construction projects. For the main groups of processes portfolio management (“Formation and alignment”, “Monitoring and control” and “Support and development” deals with their constituent sub-processes. The proposed decomposition can be used for both portfolio construction and investment projects and also has an invariant character, which allows extending the proposed approaches to other system target–oriented and project–oriented management.

  15. Streamlined project closeout for construction at KYTC.

    Science.gov (United States)

    2017-09-01

    Project closeout is the period between the end of construction and when a contract is finalized. During closeout, resources are held in encumbered funds intended for the project and in the contractors bonding capacity. Although the Kentucky Transp...

  16. Construction in Occupied Spaces

    Directory of Open Access Journals (Sweden)

    Ward Andrew E.

    2017-06-01

    Full Text Available Conducting construction activities in occupied environments presents a great challenge due to the additional logistical requirements and the presence of the building occupants. The aim of this research is to gather and evaluate the means and methods to successfully plan, manage, and execute construction activities in occupied spaces in an effort to provide consolidated industry tools and strategies for maintaining a schedule and minimizing the impact on the occupants. The methodology of the research utilizes an exploratory approach to gather qualitative data. The data was collected through interviews with industry professionals to identify industry best practices. The semi-structured interviews provided a platform for the documents, lessons learned, and the techniques and strategies used for occupied construction by the construction industry. The information obtained in the interview process identified six themes that are critical to achieving and maintaining quality in occupied construction. These themes of the schedule, cost, customer satisfaction, planning, fire/life safety and utilities, and contractor management are reviewed in detail, and the paper discusses how to manage each element. The analysis and extracted management techniques, procedures and strategies can be used by the construction industry for future projects by focusing on the critical aspects of occupied construction and the manner in which to succeed with it.

  17. Construction in Occupied Spaces

    Science.gov (United States)

    Ward, Andrew E.; Azhar, Salman; Khalfan, Malik

    2017-06-01

    Conducting construction activities in occupied environments presents a great challenge due to the additional logistical requirements and the presence of the building occupants. The aim of this research is to gather and evaluate the means and methods to successfully plan, manage, and execute construction activities in occupied spaces in an effort to provide consolidated industry tools and strategies for maintaining a schedule and minimizing the impact on the occupants. The methodology of the research utilizes an exploratory approach to gather qualitative data. The data was collected through interviews with industry professionals to identify industry best practices. The semi-structured interviews provided a platform for the documents, lessons learned, and the techniques and strategies used for occupied construction by the construction industry. The information obtained in the interview process identified six themes that are critical to achieving and maintaining quality in occupied construction. These themes of the schedule, cost, customer satisfaction, planning, fire/life safety and utilities, and contractor management are reviewed in detail, and the paper discusses how to manage each element. The analysis and extracted management techniques, procedures and strategies can be used by the construction industry for future projects by focusing on the critical aspects of occupied construction and the manner in which to succeed with it.

  18. Relationship between time management in construction industry and project management performance

    Science.gov (United States)

    Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin

    2016-08-01

    Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.

  19. Construction project investment control model based on instant information

    Institute of Scientific and Technical Information of China (English)

    WANG Xue-tong

    2006-01-01

    Change of construction conditions always influences project investment by causing the loss of construction work time and extending the duration. To resolve such problem as difficult dynamic control in work construction plan, this article presents a concept of instant optimization by ways of adjustment operation time of each working procedure to minimize investment change. Based on this concept, its mathematical model is established and a strict mathematical justification is performed. An instant optimization model takes advantage of instant information in the construction process to duly complete adjustment of construction; thus we maximize cost efficiency of project investment.

  20. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    Science.gov (United States)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  1. Cost diviation in road construction projects: The case of Palestine

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2012-02-01

    Full Text Available This paper investigates the statistical relationship between actual and estimated cost of road construction projects using data from road construction projects awarded in the West Bank in Palestine over the years 2004–2008. The study is based on a sample of 169 road construction projects. Based on this data, regression models are developed. The findings reveal that 100% of projects suffer from cost diverge, it is found that 76% of projects have cost under estimation while 24% have cost over estimation. The discrepancy between estimated and actual cost has an average of 14.6%, ranging from -39% to 98%. The relation between the project size (length and width and the cost diverge is discussed.

  2. Research on Green Construction Technology Applied at Guangzhou Hongding Building Project

    Science.gov (United States)

    Lou, Yong Zhong

    2018-06-01

    The green construction technology is the embodiment of sustainable development strategy in the construction industry, and it is a new construction mode which requires a higher environmental protection. Based on the Hongding building project, this paper describes the application and innovation of technical in the process of implementing green construction in the project, as well as the difficulties and characteristics in the specific practice; .The economic and social benefits of green construction are compared to the traditional construction model; .The achievements and experience of the green construction technology are summarized in the project; The ideas and methods in the process of implementing green construction are abstracted; some suggestions are put forward for the development of green construction.

  3. Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project

    Energy Technology Data Exchange (ETDEWEB)

    Germain, Shawn St. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Thomas, Kenneth [Idaho National Lab. (INL), Idaho Falls, ID (United States); Farris, Ronald [Idaho National Lab. (INL), Idaho Falls, ID (United States); Joe, Jeffrey [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are

  4. The LHC project

    CERN Multimedia

    CERN. Geneva

    2002-01-01

    At the halfway point in the construction of the LHC, the project is now moving from the design and procurement phase to the installation phase, which officially started on 1st March. An overview of the progress of the project is given and the final schedule for installation and commissioning is discussed. The talk will be given in English but questions can be taken in French.

  5. Shuttle Rocket Motor Program: NASA should delay awarding some construction contracts. Report to the Chair, Subcommittee on Government Activities and Transportation, Committee on Government Operations, House of Representatives

    Science.gov (United States)

    1992-01-01

    Even though the executive branch has proposed terminating the Advanced Solid Rocket Motor (ASRM) program, NASA is proceeding with all construction activity planned for FY 1992 to avoid schedule slippage if the program is reinstated by Congress. However, NASA could delay some construction activities for at least a few months without affecting the current launch data schedule. For example, NASA could delay Yellow Creek's motor storage and dock projects, Stennis' dock project, and Kennedy's rotation processing and surge facility and dock projects. Starting all construction activities as originally planned could result in unnecessarily incurring additional costs and termination liability if the funding for FY 1993 is not provided. If Congress decides to continue the program, construction could still be completed in time to avoid schedule slippage.

  6. Improvement of Construction Project Management Processes

    Directory of Open Access Journals (Sweden)

    Nazarko, J.

    2017-07-01

    Full Text Available The common denominator of the five papers published in the current edition of the Journal of Engineering, Project, and Production Management is the improvement of construction project management processes for effective use of resources. Execution of proper project management processes is widely recognized as a key success factor influencing likelihood of project success (Alleman, 2014. It is noticeable that four out of five papers in this issue of the Journal are authored or co-authored by Iranian researchers from the same Institute but their conclusions bear importance that cannot be limited to the authors’ region.

  7. Advanced construction management for lunar base construction - Surface operations planner

    Science.gov (United States)

    Kehoe, Robert P.

    1992-01-01

    The study proposes a conceptual solution and lays the framework for developing a new, sophisticated and intelligent tool for a lunar base construction crew to use. This concept integrates expert systems for critical decision making, virtual reality for training, logistics and laydown optimization, automated productivity measurements, and an advanced scheduling tool to form a unique new planning tool. The concept features extensive use of computers and expert systems software to support the actual work, while allowing the crew to control the project from the lunar surface. Consideration is given to a logistics data base, laydown area management, flexible critical progress scheduler, video simulation of assembly tasks, and assembly information and tracking documentation.

  8. Opposition multiple objective symbiotic organisms search (OMOSOS for time, cost, quality and work continuity tradeoff in repetitive projects

    Directory of Open Access Journals (Sweden)

    Duc-Hoc Tran

    2018-04-01

    Full Text Available Construction managers often face with projects containing multiple units wherein activities repeat from unit to unit. Therefore effective resource management is crucial in terms of project duration, cost and quality. Accordingly, researchers have developed several models to aid planners in developing practical and near-optimal schedules for repetitive projects. Despite their undeniable benefits, such models lack the ability of pure simultaneous optimization because existing methodologies optimize the schedule with respect to a single factor, to achieve minimum duration, total cost, resource work breaks or various combinations, respectively. This study introduces a novel approach called “opposition multiple objective symbiotic organisms search” (OMOSOS for scheduling repetitive projects. The proposed algorithm used an opposition-based learning technique for population initialization and for generation jumping. Further, this study integrated a scheduling module (M1 to determine all project objectives including time, cost, quality and interruption. The proposed algorithm was implemented on two application examples in order to demonstrate its capabilities in optimizing the scheduling of repetitive construction projects. The results indicate that the OMOSOS approach is a powerful optimization technique and can assist project managers in selecting appropriate plan for project. Keywords: Symbiotic organisms search, Multi-objective analysis, Resource tradeoff, Schedules, Repetitive

  9. IMPROVING PROJECT SCHEDULE ESTIMATES USING HISTORICAL DATA AND SIMULATION

    Directory of Open Access Journals (Sweden)

    P.H. Meyer

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: Many projects are not completed on time or within the original budget. This is caused by uncertainty in project variables as well as the occurrence of risk events. A study was done to determine ways of measuring the risk in development projects executed by a mining company in South Africa. The main objective of the study was to determine whether historical project data would provide a more accurate means of estimating the total project duration. Original estimates and actual completion times for tasks of a number of projects were analysed and compared. The results of the study indicated that a more accurate total duration for a project could be obtained by making use of historical project data. The accuracy of estimates could be improved further by building a comprehensive project schedule database within a specific industry.

    AFRIKAANSE OPSOMMING: Verskeie projekte word nie binne die oorspronklike skedule of begroting voltooi nie. Dit word dikwels veroorsaak deur onsekerheid oor projekveranderlikes en die voorkoms van risiko’s. 'n Studie is gedoen om 'n metode te ontwikkel om risiko te meet vir ontwikkelingsprojekte van 'n mynmaatskappy in Suid Afrika. Die hoofdoel van die studie was om te bepaal of historiese projekdata gebruik kon word om 'n akkurater tydsduur vir 'n projek te beraam. Die geraamde tydsduur van take vir 'n aantal projekte is ontleed en vergelyk met die werklike tydsduur. Die resultate van die studie het getoon dat 'n akkurater totale tydsduur vir die projek verkry kon word deur gebruik te maak van historiese projekdata. Die akkuraatheid kan verder verbeter word deur 'n databasis van projekskedules vir 'n bepaalde industrie te ontwikkel en by datum te hou.

  10. Identifying Issues in Applying Integrated Project Delivery to Domestic Nuclear Power Plant Construction Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Joo [Korean Nuclear Society, Daejeon (Korea, Republic of)

    2016-05-15

    Integrated Project Delivery (IPD) is defined as that people, systems, business structures, and practices of key stakeholders are incorporated into a single-team, with a single process, which executes a project in a way of optimizing the project's outcome, increasing values delivered to the end user, reducing waste, and maximizing efficiency throughout the phases of engineering to construction. The researcher had carried out literature review in terms of IPD to identify major characteristics of IPD which are presented in the following section and had compared such characteristics against peculiarities of nuclear power plant (NPP) construction projects in order to shed light on obstacles in possible application of IPD method to domestic NPP construction projects in the coming days. In this research, three (3) major characteristics of IPD were identified: 1) key stakeholders signing one balanced contract, forming de facto one body, sharing risk and reward 2) an integrated project team being formed in the early stage of a project and providing input to minimize time and cost loss from rework downstream 3) team members co-locating, having open and direct communication, making decisions on time, and pursuing the success of the project itself.

  11. A Global Review of Sustainable Construction Project Financing: Policies, Practices, and Research Efforts

    Directory of Open Access Journals (Sweden)

    Ming Shan

    2017-12-01

    Full Text Available Despite the increasing investment in sustainable development over the past decade, a systematic review of sustainable construction project financing is lacking. The objectives of this paper are to conduct a systematic review to examine the policies, practices, and research efforts in the area of sustainable construction project financing, and to explore the potential opportunities for the future research. To achieve these goals, this paper first reviewed the sustainable construction project financing practices implemented by four representative developed economies including the United Kingdom, the United States, Singapore, and Australia. Then, this paper reviewed the efforts and initiatives launched by three international organizations including the United Nations, the Organization for Economic Co-operation and Development, and International Finance Corporation. After that, this paper reviewed the research efforts of sustainable construction project financing published in peer-review journals and books. This paper identified four major research themes within this area, which are the review of financial stakeholders and market of sustainable construction, benefits and barriers to sustainable construction project financing, financial vehicles for sustainable construction projects, innovative models and mechanisms for sustainable construction project financing. Additionally, this paper revealed five directions for the future research of sustainable construction project financing, which are the identification of financial issues in sustainable construction projects, the investigation of financial vehicles for sustainable construction projects in terms of their strengths, limitations, and performances, the examination of critical drivers for implementing sustainable construction project financing, the development of a knowledge-based decision support system for implementing sustainable construction financing, and the development of best practices for

  12. Applying the TOC Project Management to Operation and Maintenance Scheduling of a Research Vessel

    Science.gov (United States)

    Manti, M. Firdausi; Fujimoto, Hideo; Chen, Lian-Yi

    Marine research vessels and their systems are major assets in the marine resources development. Since the running costs for the ship are very high, it is necessary to reduce the total cost by an efficient scheduling for operation and maintenance. To reduce project period and make it efficient, we applied TOC project management method that is a project management approach developed by Dr. Eli Goldratt. It challenges traditional approaches to project management. It will become the most important improvement in the project management since the development of PERT and critical path methodologies. As a case study, we presented the marine geology research project for the purpose of operations in addition to repair on the repairing dock projects for maintenance of vessels.

  13. A master surgical scheduling approach for cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, Jeroen M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    This paper addresses the problem of operating room (OR) scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time-consuming, tedious, and complex task. The stochasticity of the durations of surgical procedures

  14. Delay factors in failed construction projects in southwestern Nigeria ...

    African Journals Online (AJOL)

    This study was carried out with a view to showing the contribution of delay factors in the overall consideration of failed construction projects in south western Nigeria. This is considered necessary because the traditional view of construction project failure as consisting mainly of structural or functional failures tends to excuse ...

  15. Resource Allocation in a Repetitive Project Scheduling Using Genetic Algorithm

    Science.gov (United States)

    Samuel, Biju; Mathew, Jeeno

    2018-03-01

    Resource Allocation is procedure of doling out or allocating the accessible assets in a monetary way and productive way. Resource allocation is the scheduling of the accessible assets and accessible exercises or activities required while thinking about both the asset accessibility and the total project completion time. Asset provisioning and allocation takes care of that issue by permitting the specialist co-ops to deal with the assets for every individual demand of asset. A probabilistic selection procedure has been developed in order to ensure various selections of chromosomes

  16. Integrated construction management technology for power plants

    International Nuclear Information System (INIS)

    Okada, Hisako; Miura, Jun; Nishitani, Yasuhiko

    2003-01-01

    The improvement and rationalization of the plant construction technology has been promoted in order to shorten the construction period, to improve the quality and reliability, and especially to reduce construction costs. With the recent remarkable advances of computer technology, it is necessary to introduce an electronic information technology (IT) into the construction field, and to develop a business process. In such a situation, Hitachi has developed and applied integrated construction support system, which is consistent among design, production and construction. This system has design information and schedule information made electronically as a basic database, and characterizes with project management function based on that information. By introduction of this system, electronic processing of information and reduction of paperwork has enabled high efficiency and standardization of on-site indirect work. Furthermore, by collaboration with the civil company, electrical data exchange has been carried out and developed techniques to improve the interface between mechanical and civil work. High accuracy of construction planning and unification of schedule data have been achieved, and consequently, rework and adjustment at the job site have been greatly reduced. (author)

  17. The future of the Canadian oil sands: Engineering and project management advances

    Energy Technology Data Exchange (ETDEWEB)

    Madden, Peter; Morawski, Jacek

    2010-09-15

    Production technology and project management developments in Canada's oil sands industry, in the context of AMEC's experience as EPCM service provider, are discussed. Effective project management systems and workfront planning are critical to achieve cost and schedule targets and optimum construction execution. Construction Work Packages divide work into discrete pieces and Construction Work Execution Plans influence scheduling of engineering and procurement deliverables. AMEC's Engineering Data Warehouse works with intelligent engineering design tools to ensure information related to a piece of equipment is consistent across all systems. HSSE systems are proactively developed and AMEC's progressive improvement in safety performance is demonstrated.

  18. Construction of hydroelectric project generation: Focuses of the option value

    International Nuclear Information System (INIS)

    Villegas P, Clara Ines

    2002-01-01

    Work present work aims at the development of an analysis, that using the option value approach allows finding the optimal moment (from the environmental point of view), for the construction of an electrical project generation in a zone with determined environmental characteristics. The construction of the project, constitutes an irreversible decision and with uncertainty associated. The evolution of the environmental damage of the zone can be attracting through the variable C of environmental damage. The analysis developed here allows the characterization of a rule (or a barrier of environmental damage called C, which determines when, is optimal to construct the generation project or to conserve the ecosystems of the zone of location. Over this barrier, the construction of the project becomes optimal and below her the conservation of the ecosystems of the zone is privileged

  19. Assessing the costs attributed to project delay during project pre-construction stages.

    Science.gov (United States)

    2016-03-01

    This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...

  20. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD INTEGRATED DISPOSAL FACILITY (IDF)

    Energy Technology Data Exchange (ETDEWEB)

    MCLELLAN, G.W.

    2007-02-07

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal

  1. Methodology for modular nuclear plant design and construction

    International Nuclear Information System (INIS)

    Lapp, C.W.; Golay, M.

    1992-01-01

    During the past decade, the rising cost of nuclear power plant construction has caused the cancellation of many projects and has forced some utilities into bankruptcy. Many factors have contributed to capital cost increases, including regulatory changes, the absence of standard designs, and low worker productivity. Low worker productivity can be attributed to the conventional building process, which is not conductive to productive labor. This study presents innovative ways to reduce the capital cost of nuclear plants through more efficient construction processes designed to increase worker productivity. A major portion of the plant capital cost is the interest paid during construction on borrowed capital. Modular fabrication could potentially reduce interest payments by compressing the construction schedule of nuclear facilities. Additional cost savings expected from modular designs arise from improved quality, productivity, and schedule control in fabrication of plant elements within a factory environment

  2. The S-curve for forecasting waste generation in construction projects.

    Science.gov (United States)

    Lu, Weisheng; Peng, Yi; Chen, Xi; Skitmore, Martin; Zhang, Xiaoling

    2016-10-01

    Forecasting construction waste generation is the yardstick of any effort by policy-makers, researchers, practitioners and the like to manage construction and demolition (C&D) waste. This paper develops and tests an S-curve model to indicate accumulative waste generation as a project progresses. Using 37,148 disposal records generated from 138 building projects in Hong Kong in four consecutive years from January 2011 to June 2015, a wide range of potential S-curve models are examined, and as a result, the formula that best fits the historical data set is found. The S-curve model is then further linked to project characteristics using artificial neural networks (ANNs) so that it can be used to forecast waste generation in future construction projects. It was found that, among the S-curve models, cumulative logistic distribution is the best formula to fit the historical data. Meanwhile, contract sum, location, public-private nature, and duration can be used to forecast construction waste generation. The study provides contractors with not only an S-curve model to forecast overall waste generation before a project commences, but also with a detailed baseline to benchmark and manage waste during the course of construction. The major contribution of this paper is to the body of knowledge in the field of construction waste generation forecasting. By examining it with an S-curve model, the study elevates construction waste management to a level equivalent to project cost management where the model has already been readily accepted as a standard tool. Copyright © 2016 Elsevier Ltd. All rights reserved.

  3. Quality planning in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    The purpose of this paper is to investigate deeper on the factors that contribute to the effectiveness of quality planning, identifying the common problems encountered in quality planning, practices and ways for improvements in quality planning for construction projects. This paper involves data collected from construction company representatives across Malaysia that are obtained through semi-structured interviews as well as questionnaire distributions. Results shows that design of experiments (average index: 4.61), inspection (average index: 4.45) and quality audit as well as other methods (average index: 4.26) rank first, second and third most important factors respectively.

  4. Risk Consideration and Cost Estimation in Construction Projects Using Monte Carlo Simulation

    Directory of Open Access Journals (Sweden)

    Claudius A. Peleskei

    2015-06-01

    Full Text Available Construction projects usually involve high investments. It is, therefore, a risky adventure for companies as actual costs of construction projects nearly always exceed the planed scenario. This is due to the various risks and the large uncertainty existing within this industry. Determination and quantification of risks and their impact on project costs within the construction industry is described to be one of the most difficult areas. This paper analyses how the cost of construction projects can be estimated using Monte Carlo Simulation. It investigates if the different cost elements in a construction project follow a specific probability distribution. The research examines the effect of correlation between different project costs on the result of the Monte Carlo Simulation. The paper finds out that Monte Carlo Simulation can be a helpful tool for risk managers and can be used for cost estimation of construction projects. The research has shown that cost distributions are positively skewed and cost elements seem to have some interdependent relationships.

  5. Mapping of information and identification of construction waste at project life cycle

    Science.gov (United States)

    Wibowo, Mochamad Agung; Handayani, Naniek Utami; Nurdiana, Asri; Sholeh, Moh Nur; Pamungkas, Gita Silvia

    2018-03-01

    The development of construction project towards green construction is needed in order to improve the efficiency of construction projects. One that needs to be minimized is construction waste. Construction waste is waste generated from construction project activities, both solid waste and non solid waste. More specifically, the waste happens at every phase of the project life cycle. Project life cycle are the stage of idea, design, construction, and operation/maintenance. Each phase is managed by different stakeholders. Therefore it requires special handling from the involved stakeholders. The objective of the study is to map the information and identify the waste at each phase of the project life cycle. The purpose of mapping is to figure out the process of information and product flow and with its timeline. This mapping used Value Stream Mapping (VSM). Identification of waste was done by distributing questionnaire to respondents to know the waste according to owner, consultant planner, contractor, and supervisory consultant. The result of the study is the mapping of information flow and product flow at the phases of idea, design, construction, and operation/ maintenance.

  6. Country Report Summary: Japan [Project Management in Nuclear Power Plant Construction: Guidelines and Experience

    International Nuclear Information System (INIS)

    2012-01-01

    . Although the conceptual design work may be outsourced, the utilities manage everything else from the infrastructure, the access roads, the supply of utilities to the site (electricity, water, etc.), the site preparation, the general arrangement of the work areas, the interface between contractors, the scheduling of construction activities, at the site, to overseeing the work of all contractors from the safety, quality, scheduling and contractual standpoints. In order to manage and oversee the suppliers' construction works at the site, a considerable number of qualified engineers and inspectors are required. (3) Consequently to the previous two factors, the Japanese electric companies have built nuclear power plants by awarding split-package contracts (the so-called island approach) as well as smaller component contracts. E.g. HEPCO awarded some 150 contracts for the construction of Tomari NPP Unit 3. (4) Given the large number of utilities in Japan, each company built relatively few new nuclear power plants and this has made it difficult to maintain on their own a highly qualified workforce. Fortunately all utilities in Japan have developed and maintained good relationships with one another and willingly share their human resources where the need arises. Salaries and expenditures however continue to be paid by the original employers. This way the host utility can use the borrowed staff for its construction and the lending utility can maintain its qualified engineers for its next construction project.

  7. Identifying and managing risk in international construction projects

    Directory of Open Access Journals (Sweden)

    Sachin Kerur

    2012-04-01

    Full Text Available Over the last decade, major construction projects have increasingly arisen in countries or regions that lack specialist, expert construction contractors, suppliers and consultants. Steps are being taken by governments in the Middle East, Eastern Europe, China, India and developing markets to address national infrastructure deficits, and by so doing, are creating new regions of booming construction demand. When coupled with anaemic growth in developed markets such as the United Kingdom, the USA and Western Europe, foreign markets present attractive opportunities to the global construction industry. However, foreign markets are littered with the cautionary tales of international contractors and consultants that have failed to grasp the intricacies and risks of operating in a new environment and have failed to capitalise on the opportunities available. By identifying the classes of risks, and undertaking detailed analysis, ranking and mitigation of relevant jurisdictional risks, participants in international construction projects will increase the likelihood of project success and commercial longevity in the new jurisdiction. Risk identification and assessment is not a science but an art, and while there are many potential approaches to the issue, we propose that our strategies for identifying, assessing, ranking and mitigating jurisdictional risks offer new international players a good chance of commercial success.

  8. Impact of Construction Health & Safety Regulations on Project ...

    African Journals Online (AJOL)

    Impact of Construction Health & Safety Regulations on Project Parameters in Nigeria: Consultants and Contractors View. ... The study recommends that better attention is given to health and safety should as a project parameter and that related practice notes and guidelines should be evolved for all project stakeholders.

  9. Construction Worker Fatigue Prediction Model Based on System Dynamic

    Directory of Open Access Journals (Sweden)

    Wahyu Adi Tri Joko

    2017-01-01

    Full Text Available Construction accident can be caused by internal and external factors such as worker fatigue and unsafe project environment. Tight schedule of construction project forcing construction worker to work overtime in long period. This situation leads to worker fatigue. This paper proposes a model to predict construction worker fatigue based on system dynamic (SD. System dynamic is used to represent correlation among internal and external factors and to simulate level of worker fatigue. To validate the model, 93 construction workers whom worked in a high rise building construction projects, were used as case study. The result shows that excessive workload, working elevation and age, are the main factors lead to construction worker fatigue. Simulation result also shows that these factors can increase worker fatigue level to 21.2% times compared to normal condition. Beside predicting worker fatigue level this model can also be used as early warning system to prevent construction worker accident

  10. Financial and organizational models of NPP construction projects

    International Nuclear Information System (INIS)

    Ivanov, Timur

    2010-01-01

    The recent evolution of financial and organizational models of NPP projects can be truly reputed to open a new page of the world market of NPP construction. The definition of the concrete model is based mostly on specific cooperation backgrounds and current terms and conditions under which the particular NPP project is being evolved. In this article the most commonly known strategies and schemes of financing structuring for export NPP construction projects are scrutinized. Special attention is paid to the analysis of BOO/BOT models which are based on the public-private partnership. Most BOO/BOT projects in the power sector has Power Purchase Agreements (PPA) as an integral part of them. The PPA key principles are studied here as well. The flexibility and adaptability of the public-private partnership models for financing and organization of the NPP projects contributes substantially to the competitiveness of the NPP projects especially under current economic conditions. (orig.)

  11. Criticality in Location-Based Management of Construction

    DEFF Research Database (Denmark)

    Büchmann-Slorup, Rolf

    , the current literature does not include a collected description of what constitute critical activities in LBM. Nor have the implications for scheduling and control efforts of these changes in criticality been described. Accordingly, the present thesis establishes a collected criticality principle of LBM......; highlights the implications of this alternative criticality principle to the schedule and control effort on construction projects; and suggests how time buffers should be applied on LBM projects to protect critical activities, compress project’s lead times, optimize flow, and minimize resource consumption....... The thesis offers three main results that contribute to the current LBM literature and close some of the gaps therein. The thesis conceptualizes the criticality principle of LBM by analyzing the relationship between inherent constraints in LBM and the lead times of projects. The collected criticality...

  12. M.S. independent research study : partnering on small construction project

    OpenAIRE

    Conley, Michael A

    1997-01-01

    This investigation will address the possibility that partnering concepts are underutilized in small government projects. If Government Contracting Officers utilized partnering concepts on small construction projects, there could be a potential for saving millions of dollars annually. The primary objective of this report is to inform Contracting Officers of the benefits of partnering on small construction projects. Small projects will be considered to have a value of less than $3 million, mid-...

  13. Three Construction Projects with Wood Scraps

    Science.gov (United States)

    Levine, Elizabeth

    1977-01-01

    Wood, a natural material, appeals to children of all ages. Wood construction allows children the flexibility of moving parts of their work around until they are satisfied with the arrangement. Three projects are described. (Author/RK)

  14. A Systematic Approach to Modelling Change Processes in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ibrahim Motawa

    2012-11-01

    Full Text Available Modelling change processes within construction projects isessential to implement changes efficiently. Incomplete informationon the project variables at the early stages of projects leads toinadequate knowledge of future states and imprecision arisingfrom ambiguity in project parameters. This lack of knowledge isconsidered among the main source of changes in construction.Change identification and evaluation, in addition to predictingits impacts on project parameters, can help in minimising thedisruptive effects of changes. This paper presents a systematicapproach to modelling change process within construction projectsthat helps improve change identification and evaluation. Theapproach represents the key decisions required to implementchanges. The requirements of an effective change processare presented first. The variables defined for efficient changeassessment and diagnosis are then presented. Assessmentof construction changes requires an analysis for the projectcharacteristics that lead to change and also analysis of therelationship between the change causes and effects. The paperconcludes that, at the early stages of a project, projects with a highlikelihood of change occurrence should have a control mechanismover the project characteristics that have high influence on theproject. It also concludes, for the relationship between changecauses and effects, the multiple causes of change should bemodelled in a way to enable evaluating the change effects moreaccurately. The proposed approach is the framework for tacklingsuch conclusions and can be used for evaluating change casesdepending on the available information at the early stages ofconstruction projects.

  15. Project W-420 stack monitoring system upgrades

    International Nuclear Information System (INIS)

    CARPENTER, K.E.

    1999-01-01

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420

  16. Factors causing cost variation for constructing wastewater projects in Egypt

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-03-01

    Full Text Available Cost is one of the major considerations throughout the project management life cycle and can be regarded as one of the most important parameters of a project and the driving force of project success. Despite its proven importance, it is common to see a construction project failing to achieve its objectives within the specific cost. Cost variation is a very frequent phenomenon and is almost associated with nearly constructing all wastewater projects. Maintaining steady cost projection on wastewater projects had been recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial cost plan had been prevalent on construction sites. However, little or no effort has been made to curtail the phenomenon, this research work attempts to identify, investigate and rank factors perceived to affect cost variation in the Egyptian wastewater projects with respect to their relative importance so as to proffer possible ways of coping with this phenomenon. To achieve this objective, author invited practitioners and experts, comprising a statistically representative sample, to participate in a structured questionnaire survey. Brain storming was taken into consideration, through which a number of cost variation factors were identified for constructing wastewater projects. Totally 52 factors were short-listed to be made part of the questionnaire survey and the survey was conducted with experts and representatives from private, public and local general construction firms. The data were analyzed using Relative Importance Index, ranking and simple percentages. It was analytically discovered that factors such as: (1 Lowest bidding procurement method; (2 Additional work; (3 Bureaucracy in bidding/tendering method; (4 Wrong method of cost estimation; and (5 Funding problems were critical for causing cost variation, while (1 Inaccurate cost estimation; (2 Mode of financing and payment for completed work; (3 Unexpected ground

  17. Ranking of Delay Factors for Makkah’s Construction Industry

    Directory of Open Access Journals (Sweden)

    Al-Emad Nashwan

    2017-01-01

    Full Text Available This paper presents identification of significant delay factors encountered by Makkah’s construction industry using quantitative approach. A structured questionnaire developed based on literature review was verified through pilot study involved selected construction experts. Questionnaire survey was conducted amongst Makkah construction practitioners include contractors, consultants and project management consultancy. The survey managed to collect 100 valid responses which were used to rank the factors using average index approach. Results of the analysis for 10 most significant factors causing construction delay in Makkah construction industry are Difficulties in financing project by contractor, Poor coordination between parties, Shortage of manpower, Delays in producing design documents, Improper planning and scheduling of the project, Delay in progress payments, Low productivity level of labour, Poor communication between parties, Unqualified workforce and Poor contract management. This finding is helpful to Makkah construction’s community particularly projects’ stakeholders in avoiding potential delay for their future projects.

  18. Project and Production Management in the Construction Industry

    OpenAIRE

    Chien-Ho Ko

    2012-01-01

    In this issue, the Journal of Engineering, Project, and Production Management (EPPM-Journal) presents five original research papers related to project and production management in the construction industry from authors in Africa, Asia, and Europe.

  19. Evaluation model of project complexity for large-scale construction projects in Iran - A Fuzzy ANP approach

    Directory of Open Access Journals (Sweden)

    Aliyeh Kazemi

    2016-09-01

    Full Text Available Construction projects have always been complex. By growing trend of this complexity, implementations of large-scale constructions become harder. Hence, evaluating and understanding these complexities are critical. Correct evaluation of a project complication can provide executives and managers with good source to use. Fuzzy analytic network process (ANP is a logical and systematic approach toward defining, evaluation, and grading. This method allows for analyzing complex systems, and determining complexity of them. In this study, by taking advantage of fuzzy ANP, effective indexes for development of complications in large-scale construction projects in Iran have been determined and prioritized. The results show socio-political, project system interdependencies, and technological complexity indexes ranked top to three. Furthermore, in comparison of three main huge projects: commercial-administrative, hospital, and skyscrapers, the hospital project had been evaluated as the most complicated. This model is beneficial for professionals in managing large-scale projects.

  20. Efficient Project Delivery Using Lean Principles - An Indian Case Study

    Science.gov (United States)

    Kovvuri, P. Ramachandra Reddy; Sawhney, Anil; Ahuja, Ritu; Sreekumar, Aiswarya

    2016-03-01

    Construction industry in India is growing at a rapid pace. Along with this growth, the industry is facing numerous challenges that are making delivery of projects inefficient. Experts believe that capacity constraints in the industry need to be addressed immediately. Government has recommended `introduction of efficient technologies and modern management techniques' to increase the productivity of the industry. In this context, lean principles can act as a lever to make project delivery more efficient and provide the much needed impetus to the Indian construction sector. Around the globe lean principles are showing positive results on the projects. Project teams are reporting improvements in construction time, cost and quality along with softer benefits of enhanced collaboration, coordination and trust in project teams. Can adoption of lean principles provide similar benefits in the Indian construction sector? This research was conducted to answer this question. Using an action research approach a key lean construction tool called Last Planner System (LPS) was tested on a large Indian construction project. The work described in this work investigates the improvements achieved in project delivery by adopting LPS in Indian construction sector. Comparison in pre- and post-implementation data demonstrates increase in the certainty of work-flow and improves schedule compliance. This is measured through a simple LPS metric called percent plan complete. Explicit improvements in schedule performance are seen during 8 week LPS implementation along with implicit improvements in coordination, collaboration and trust in the project team. This work reports the findings of LPS implementation on the case study project outlining the barriers and drivers to adoption, strategies needed to ensure successful implementation and roadmap for implementation. Based on the findings the authors envision that lean construction can make project delivery more efficient in India.

  1. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons

  2. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  3. Hitachi's experience and achievements in ABWR construction

    International Nuclear Information System (INIS)

    Inoue, Takashi; Miura, Jun; Murayama, Kouichi

    2003-01-01

    Hitachi, Ltd. (Hitachi) is taking charge of the turbine island of Chubu Electric Power Company's Hamaoka nuclear power plant Unit No. 5 (Hamaoka 5), and all facilities of Hokuriku Electric Power Company's Shika Nuclear Power Station Unit No. 2 (Shika 2). Hitachi has achieved shorter schedules and lower costs in the two projects with the following construction methods. First, Hitachi applied modularization and the area-by-area method. These methods enable us to undertake building and installation work in parallel. Second, the floor packaging construction method enables us to finish installation in every area earlier than conventional methods. Moreover, manpower can be distributed evenly. This paper reports the application of these advanced construction methods to the Hamaoka 5 and Shika 2 projects. Installations such as RCCV modules and condenser blocks are presented in this paper. In addition, Hitachi is using 3D-CAD engineering and our own construction management system to optimize the planning of construction procedures and the installation of equipment in these projects. Thus Hitachi is always striving to improve the reliability, safety and economy of ABWR construction technologies. (author)

  4. Alignment between ICT and communication in construction projects

    NARCIS (Netherlands)

    Adriaanse, Adriaan Maria; Voordijk, Johannes T.; Dewulf, Geert P.M.R.

    2004-01-01

    Through rapid advancements in ICT, opportunities arise in enhancing communication between participants of different organisations in construction projects. The use of ICT in construction is, however, relatively limited and ineffective compared to other sectors such as the automotive or the aerospace

  5. Simultaneous planning of the project scheduling and material procurement problem under the presence of multiple suppliers

    Science.gov (United States)

    Tabrizi, Babak H.; Ghaderi, Seyed Farid

    2016-09-01

    Simultaneous planning of project scheduling and material procurement can improve the project execution costs. Hence, the issue has been addressed here by a mixed-integer programming model. The proposed model facilitates the procurement decisions by accounting for a number of suppliers offering a distinctive discount formula from which to purchase the required materials. It is aimed at developing schedules with the best net present value regarding the obtained benefit and costs of the project execution. A genetic algorithm is applied to deal with the problem, in addition to a modified version equipped with a variable neighbourhood search. The underlying factors of the solution methods are calibrated by the Taguchi method to obtain robust solutions. The performance of the aforementioned methods is compared for different problem sizes, in which the utilized local search proved efficient. Finally, a sensitivity analysis is carried out to check the effect of inflation on the objective function value.

  6. Reducing construction waste: A study of urban infrastructure projects.

    Science.gov (United States)

    de Magalhães, Ruane Fernandes; Danilevicz, Ângela de Moura Ferreira; Saurin, Tarcisio Abreu

    2017-09-01

    The construction industry is well-known for producing waste detrimental to the environment, and its impacts have increased with the development process of cities. Although there are several studies focused on the environmental impact of residential and commercial buildings, less knowledge is available regarding decreasing construction waste (CW) generation in urban infrastructure projects. This study presents best practices to reduce waste in the said projects, stressing the role of decision-making in the design stage and the effective management of construction processes in public sector. The best practices were identified from literature review, document analysis in 14 projects of urban infrastructure, and both qualitative and quantitative survey with 18 experts (architects and engineers) playing different roles on those projects. The contributions of these research are: (i) the identification of the main building techniques related to the urban design typologies analyzed; (ii) the identification of cause-effect relationships between the design choices and the CW generation diagnosis; (iii) the proposal of a checklist to support the decision-making process, that can be used as a control and evaluation instrument when developing urban infrastructure designs, focused on the construction waste minimization (CWM). Copyright © 2017 Elsevier Ltd. All rights reserved.

  7. Adoption and Use of Interorganizational ICT in a Construction Project

    NARCIS (Netherlands)

    Adriaanse, Adriaan Maria; Voordijk, Johannes T.; Dewulf, Geert P.M.R.

    2010-01-01

    The objective of this research is to explain why actors are not using interorganizational information and communication technology (ICT) in construction projects in the intended way, by determining the mechanisms that influence the way actors use this ICT over time during a construction project.

  8. Construction safety management guide for use with DOE Order 440.1

    International Nuclear Information System (INIS)

    1997-01-01

    DOE Order (DOE O) 440.1, Worker Protection Management for DOE Federal and Contractor Employees, establishes the framework for an effective worker protection program to reduce or eliminate accidental losses, injuries, and illnesses by providing workers with places of employment free of recognized hazards. In addition to prescribing program requirements applicable to all activities performed by DOE and its contractors, DOE O 440.1 provides specific requirements applicable only to construction activities. The intent of these construction-specific requirements is to compel the proactive management of construction safety on a project-by-project basis and, to the greatest extent possible, integrate the management of safety and health, both in terms of project personnel and management methodologies, with the management of the other primary elements of construction project performance: quality, cost and schedule

  9. Qualitative Approach on Investigating Failure Factors of Yemeni Mega Construction Projects

    OpenAIRE

    Gamil Yaser; Abdul Rahman Ismail; Nagapan Sasitharan; Alemad Nashwan

    2017-01-01

    Large construction projects in Yemen face many impediments and challenges to be completed successfully. This article presents an investigative cases study of three mega construction projects which are considered failed to achieve their assigned plans and objectives. An exploratory interview was implied in this study via telephone to three construction experts who involved directly in these mega projects at the managerial level. Semi-structured questions based on literature were designed as gu...

  10. Causes of Low-Skilled Workers’ Performance in Construction Projects

    Directory of Open Access Journals (Sweden)

    Alhaji Ali Zannah

    2017-06-01

    Full Text Available Skilled workers’ performance is one of the crucial aspects of labour productivity that requires proper attention for effective projects delivery in the construction industry. The level of skilled workers’ low performance has been seen to be a major factor which contributes toward inefficient construction projects productivity. Therefore, the objective of this research is to identify the causes of low-skilled workers’ performance in construction projects in the Nigeria. The objective was achieved through a structured quantitative method of questionnaire distributed to 150 respondents that comprise of active stakeholders in the Nigerian construction industry. 111 responses representing 74 % were retrieved. The data were analysed using descriptive statistics and analysis of variance (ANOVA. The finding shows that; low wages of skilled, lack of sufficient skill acquisition centres and lack of incentive schemes for skilled workers were the most significant causes of low-skilled workers’ performance in the Nigerian construction industry. The homogenous analysis indicates that there are significant differences in perception of respondents on few variables whereas majority of respondents have similarities in most of the variables. The research findings indicate the need for stakeholders in the Nigerian construction industry to provide incentives and motivate skilled workers, provide training and retraining, conducive working condition, supply of quality materials and equipment, and proper site management in order improve low-skilled workers’ performance in Nigerian construction industry towards optimal performance.

  11. The Role of Demonstration Projects in Construction innovation processes

    DEFF Research Database (Denmark)

    Clausen, Lennie

    1999-01-01

    The article is describing the methodology of a case-study approach to the investigation of demonstration projects and their impact on the development of process and product innovations in the construction industry.......The article is describing the methodology of a case-study approach to the investigation of demonstration projects and their impact on the development of process and product innovations in the construction industry....

  12. Construction project of Flamanville 3 NPP. The participation of Iberdrola engineering and Construction

    International Nuclear Information System (INIS)

    Diaz Prada, J. I.; Cubian, B.

    2014-01-01

    Iberdrola Engineering and Construction (IIC) leads several projects mini EPC for the EPR Flamanville 3 NPP for providing important for safety components and auxiliary systems in the pump house and in the turbine island. The realization of this new nuclear project has been a challenge from the technical and organizational perspective because the plant is the first of the new nuclear station (FDAKE) type EPR 1700 MWe series in a highly restrictive environment due to to the large number of particular requirements from the final customer and the meager degree of progress of the design to the date of commencement of construction. (Author)

  13. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Directory of Open Access Journals (Sweden)

    Gafurov Andrey

    2018-01-01

    Full Text Available The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the “Project analysis scenario” flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  14. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Science.gov (United States)

    Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir

    2018-03-01

    The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  15. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    OpenAIRE

    Li, Ming; Wu, Guangdong

    2014-01-01

    Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illus...

  16. Project Structuring and Risk Allocation for NPP Construction

    International Nuclear Information System (INIS)

    Kaser, Greg

    2013-01-01

    This presentation treats of the project risks and how to mitigate major risks and structure a new project. It also talks about the contract implications to handle the specificities of a new project: design complexities, interface between the engineering, procurement and constructing contractors, and finally discusses the necessity of a stable regulatory environment and the role of government

  17. Incentive Model Based on Cooperative Relationship in Sustainable Construction Projects

    Directory of Open Access Journals (Sweden)

    Guangdong Wu

    2017-07-01

    Full Text Available Considering the cooperative relationship between owners and contractors in sustainable construction projects, as well as the synergistic effects created by cooperative behaviors, a cooperative incentive model was developed using game theory. The model was formulated and analyzed under both non-moral hazard and moral hazard situations. Then, a numerical simulation and example were proposed to verify the conclusions derived from the model. The results showed that the synergistic effect increases the input intensity of one party’s resource transfer into the increase of marginal utility of the other party, thus the owner and contractor are willing to enhance their levels of effort. One party’s optimal benefit allocation coefficient is positively affected by its own output efficiency, and negatively affected by the other party’s output efficiency. The effort level and expected benefits of the owner and contractor can be improved by enhancing the cooperative relationship between the two parties, as well as enhancing the net benefits of a sustainable construction project. The synergistic effect cannot lower the negative effect of moral hazard behaviors during the implementation of sustainable construction projects. Conversely, the higher levels of the cooperative relationship, the wider the gaps amongst the optimal values under both non-moral hazard and moral hazard situations for the levels of effort, expected benefits and net project benefits. Since few studies to date have emphasized the effects of cooperative relationship on sustainable construction projects, this study constructed a game-based incentive model to bridge the gaps. This study contributes significant theoretical and practical insights into the management of cooperation amongst stakeholders, and into the enhancement of the overall benefits of sustainable construction projects.

  18. Guidelines of Decommissioning Schedule Establishment

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Jae Yong; Yun, Taesik; Kim, Younggook; Kim, Hee-Geun [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    Decommissioning has recently become an issue highlighted in Korea due to the Permanent Shutdown (PS) of Kori-1 plant. Since Korea Hydro and Nuclear Power (KHNP) Company decided the PS of Kori-1 instead of further continued operation, Kori-1 will be the first decommissioning plant of the commercial reactors in Korea. Korean regulatory authority demands Initial Decommissioning Plan (IDP) for all the plants in operation and under construction. In addition, decommissioning should be considered for the completion of the life cycle of NPPs. To date, Korea has no experience regarding decommissioning of the commercial reactor and a lot of uncertainties will be expected due to its site-specific factors. However, optimized decommissioning process schedule must be indispensable in the safety and economic efficiency of the project. Differed from USA, Korea has no experience and know-hows of the operation and site management for decommissioning. Hence, in Korea, establishment of decommissioning schedule has to give more weight to safety than precedent cases. More economical and rational schedule will be composed by collecting and analyzing the experience data and site-specific data and information as the decommissioning progresses. In a long-range outlook, KHNP having capability of NPP decommissioning will try to decommissioning business in Korea and foreign countries.

  19. Contracting Economics of Large Engineering and Construction Projects

    NARCIS (Netherlands)

    Berends, T.C.

    2007-01-01

    Large Engineering and Construction Projects (LECPs) form an important area of economic activity, covering a range of different artefacts. These projects have in common that they are massive undertakings, spanning long time periods and they involve large capital investments. Uncertainty and risk are

  20. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ming Li

    2014-01-01

    Full Text Available Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illustrate the robust model, nondominated sorting genetic algorithm-II (NSGA-II is modified to solve the project example. The results show that, by means of adjusting the time and cost robust coefficients, the robust Pareto sets for time-cost tradeoff can be obtained according to different acceptable risk level, from which the decision maker could choose the preferred construction alternative.

  1. A construction process model for implementing constructability in construction

    NARCIS (Netherlands)

    Langkemper, J.; Al-Jibouri, S.; Reymen, I.M.M.J.; Maas, G.J.; Gassel, van F.

    2003-01-01

    In construction, failure of design professionals to consider how a builder will implement the design can result in scheduling problems, cost escalation, delays and disputes during the construction process. The integration of construction knowledge and experience during planning and design is termed

  2. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Log in or Register to get access to full text downloads. ... (decision-making, problem-solving, listening, verbal competency, motivation, persuasion, ... Keywords: Communication skills and leadership model, construction project management, ...

  3. A new framework for construction project definition stage

    DEFF Research Database (Denmark)

    Pikas, Ergo; Oehmen, Josef; Koskela, Lauri

    2018-01-01

    One major reason for the poor performance of construction project delivery is related to the 'ill'- performed project definition stage. The emphasis on rational decision-making and methods have stifled the creativity important to problem structuring and solution generation. Problem is in the poor...

  4. The influence of client brief and change order in construction project

    Science.gov (United States)

    Mahat, N. A. A.; Adnan, H.

    2018-02-01

    Construction briefing is a statement of needs about intentions and projects objectives. Briefing process is the preliminary stage in the design process and successful briefing can achieve project delivery right on target time, cost and quality of project confidently. Although there are many efforts to approach client’s requirement and needs for a project, it is still not collected adequately to make proper solutions in design. Thus, these may lead the client to include change orders during the construction phase. This paper is concerned toward the influence of client’s briefing of a construction project that impact on the change order on the construction works. The research objective is to identify the influence of client’s brief on change orders, therefore, the aims of the research is to reduce change orders in project delivery. This research adopted both qualitative and quantitative data collection methods which are content analysis and semi structure interview. The findings highlight factors contributing to change orders and the essential attributes of clients during the briefing stage that may help minimise them.

  5. Horizon Dam design, construction, and quality management

    Energy Technology Data Exchange (ETDEWEB)

    Patrick, B. [EBA Engineering Consultants Ltd., Nanaimo, BC (Canada); Sisson, R. [Canadian Natural Resources Ltd., Fort McMurray, AB (Canada)

    2010-07-01

    This paper discussed the design and construction of the Tar River Diversion Dam and the quality management system (QMS) used during construction. The project was unusual in that the company constructed the project using its own workforce, without contractors, under challenging schedule and site conditions. The topography, geology and geotechnical aspects of the site were discussed along with the embankment design, seepage control measures and construction execution. The QMS was designed to fit the needs of the unique construction execution strategy and meet safety, reliability, performance, and operation requirements, comply with all regulations and approval conditions, and identify and communicate risk to the appropriate entity. Specifications and construction procedures had to be modified to accommodate equipment operators trained with the skills and techniques of mine operations, not those associated with conventional civil construction projects. Foundation movement identified during construction required mid-build design changes, construction rescheduling, and additional deformation analyses to determine long-term stability. The QMS allowed changes in the understanding of site conditions to be quickly addressed and risks to be identified and cost-effectively mitigated. Design consultants were used to modify designs and appropriately identify and mitigate risks. The approach to embankment construction was successful because the QMS included processes for change management, issue resolution, and risk-benefit assessment, and because experienced personnel had a regular presence on the construction site and worked collaboratively. The effective QMS was deemed to be integral to the success of the construction project. 1 tab., 7 figs.

  6. Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective

    Science.gov (United States)

    Subramanyam, K.; Haridharan, M. K.

    2017-07-01

    Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.

  7. Evaluation of scheduling problems for the project planning of large-scale projects using the example of nuclear facility dismantling; Evaluation von Schedulingproblemen fuer die Projektplanung von Grossprojekten am Beispiel des kerntechnischen Rueckbaus

    Energy Technology Data Exchange (ETDEWEB)

    Huebner, Felix; Schellenbaum, Uli; Stuerck, Christian; Gerhards, Patrick; Schultmann, Frank

    2017-05-15

    The magnitude of widespread nuclear decommissioning and dismantling, regarding deconstruction costs and project duration, exceeds even most of the prominent large-scale projects. The deconstruction costs of one reactor are estimated at several hundred million Euros and the dismantling period for more than a decade. The nuclear power plants built in the 1970s are coming closer to the end of their planned operating lifespan. Therefore, the decommissioning and dismantling of nuclear facilities, which is posing a multitude of challenges to planning and implementation, is becoming more and more relevant. This study describes planning methods for large-scale projects. The goal of this paper is to formulate a project planning problem that appropriately copes with the specific challenges of nuclear deconstruction projects. For this purpose, the requirements for appropriate scheduling methods are presented. Furthermore, a variety of possible scheduling problems are introduced and compared by their specifications and their behaviour. A set of particular scheduling problems including possible extensions and generalisations is assessed in detail. Based on the introduced problems and extensions, a Multi-mode Resource Investment Problem with Tardiness Penalty is chosen to fit the requirements of nuclear facility dismantling. This scheduling problem is then customised and adjusted according to the specific challenges of nuclear deconstruction projects. It can be called a Multi-mode Resource Investment Problem under the consideration of generalized precedence constraints and post-operational costs.

  8. Study on nuclear power plant project construction and management mode in China

    International Nuclear Information System (INIS)

    Wang Kai; Chen Lian

    2009-01-01

    Project management mode plays a key role in project construction, especially in nuclear power field. From the aspects of right, responsibility and benefit, this paper discussed the differences among the common used project management modes. Also the main kinds of the construction management modes used in China's nuclear power plants were summarized. At last, considering the experience of Ningde nuclear power plant, this paper put forward several perspectives about the selection of project management mode in nuclear power plant construction. (authors)

  9. Critical path analysis in early stage of nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2009-01-01

    The technical program and contract model as well as project management system and preliminary design defined in the early stage of nuclear power project are the key condition impact on the quality, schedule and cost of the nuclear power project. This paper, taking the CPR1000 coastal nuclear power station as an example, analyzes the critical path in the early stage of nuclear power project for five fields, i.e. licensing, design and procurement, site preparation, tender of construction contracts and construction preparation, and organization. (authors)

  10. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    Science.gov (United States)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  11. Public private partnership construction project disputes in Nigeria ...

    African Journals Online (AJOL)

    This research examines the possibility of operating a smooth Public Private Partnership (PPP) project for the entire concession period following financial closure, without recourse to litigation or arbitration for settlement of disputes by studying the causes and effects of disputes in construction projects procured in Nigeria ...

  12. Effects of Procurement Related Factors on Construction Project ...

    African Journals Online (AJOL)

    Several Literatures in construction management support the view that procurements have impacts on project performance. Aim of this study is to investigate the effects of procurement related factors of procurement selection criteria, tendering methods and variation orders on project performance. Purpose of the study is to ...

  13. First decade: TVA's first ten years of nuclear power plant design and construction experience

    International Nuclear Information System (INIS)

    Willis, W.F.

    1978-01-01

    This paper reviews the experience of the Tennessee Valley Authority's design and construction program for nuclear power plants in terms of schedule and capital costs in three separate phases. Phase one recapitulates the status of the nuclear power industry in 1966 and sets forth the assumptions used for estimating capital costs and projecting schedules for the first Tennessee Valley Authority units. Phase two describes what happened to the program in the hectic early 1970s in terms of expansion of scope (particularly for safety features), the dramatic increase in regulatory requirements, vendor problems, stretchout of project schedules, and unprecented inflation. Phase three addresses the assumptions used today in estimating schedules and plant costs for the next 10-year period. 7 figures, 7 tables

  14. Radiology Architecture Project Primer.

    Science.gov (United States)

    Sze, Raymond W; Hogan, Laurie; Teshima, Satoshi; Davidson, Scott

    2017-12-19

    The rapid pace of technologic advancement and increasing expectations for patient- and family-friendly environments make it common for radiology leaders to be involved in imaging remodel and construction projects. Most radiologists and business directors lack formal training in architectural and construction processes but are expected to play significant and often leading roles in all phases of an imaging construction project. Avoidable mistakes can result in significant increased costs and scheduling delays; knowledgeable participation and communication can result in a final product that enhances staff workflow and morale and improves patient care and experience. This article presents practical guidelines for preparing for and leading a new imaging architectural and construction project. We share principles derived from the radiology and nonradiology literature and our own experience over the past decade completely remodeling a large pediatric radiology department and building a full-service outpatient imaging center. Copyright © 2017 American College of Radiology. Published by Elsevier Inc. All rights reserved.

  15. Presenting a Model Based on Fuzzy Application to Optimize the Time of IBS Projects in Gas Refineries

    Directory of Open Access Journals (Sweden)

    Naderpour Abbas

    2017-01-01

    Full Text Available Nowadays, the construction industry has started to embrace IBS as a method of attaining better construction quality and productivity and reducing risks related to occupational safety and health. The built of pre-fabricated component in factories reduces many problems related to lack of purposing uncertainty in scheduling calculation and time management of projects. In the case of using IBS method for managing time in projects, former studies such as Allan Tay’s research, indicates that this method can save up at least 29% of overall completion period versus the conventional method. But beside mentioned advantages of this technical method, the projects could be optimized more and more in scheduling calculations. This issue is critical in gas refineries, since special parameters such as risk of spreading poison H2S gas and mandatory of performing projects in short time period events such as maintenance overhauls demands to perform projects in optimum time. Custom scheduling calculation of project planning uses the Critical Path Method (CPM as a tool for Planning Project’s activities. The researches of this paper’s authors indicated that Fuzzy Critical Path Method (FCPM is the best technique to manage the uncertainty in project scheduling and can save up the construction project’s time versus the custom methods. This paper aims to present a model based on fuzzy application in CPM calculations to optimize the time of Industrial Building System.

  16. Risk Evaluation on UHV Power Transmission Construction Project Based on AHP and FCE Method

    OpenAIRE

    Huiru Zhao; Sen Guo

    2014-01-01

    Ultra high voltage (UHV) power transmission construction project is a high-tech power grid construction project which faces many risks and uncertainty. Identifying the risk of UHV power transmission construction project can help mitigate the risk loss and promote the smooth construction. The risk evaluation on “Zhejiang-Fuzhou” UHV power transmission construction project was performed based on analytic hierarchy process (AHP) and fuzzy comprehensive evaluation (FCE) method in this paper. Afte...

  17. Construction quality assurance program plan for the WIPP project, Carlsbad, NM

    International Nuclear Information System (INIS)

    1987-05-01

    The purpose of this plan is to describe the Quality Assurance (QA) Program to be established and implemented by the US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Project Office (WPO) and by the Major Project Participants: the Architect-Engineer (Bechtel), the Construction Manager (US Army Corps of Engineers), the Scientific Advisor (Sandia National Laboratory), and the Management and Operating Contractor (Westinghouse Electric Corporation). This plan addresses the construction, including site evaluation, design, and turnover phases of WIPP. Other work in progress during the same period is controlled by DOE documents applicable to that work effort. The prime responsibility for ensuring the quality of construction rests with the DOE WIPP Project Office and is implemented through the combined efforts of the Construction Manager, the Construction Contractors, the Management and Operating Contractor, and the Architect-Engineer. Inspection and burden of proof of acceptability rests with the Construction Contractor as defined by the technical provisions of the contract and as otherwise specified by the DOE WIPP Project Office on an individual work-package basis. To the maximum extent possible, acceptance of work will be based upon first-hand witnessing by the Construction Manager and other representatives of the DOE organization

  18. Critical Success Factors in Construction Projects (Governmental Projects as a Case Study)

    OpenAIRE

    Hatem Khaleefah Al-Ageeli; Abdul Salam J. Ali Alzobaee

    2016-01-01

    The importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A select...

  19. Decision problems in management of construction projects

    Science.gov (United States)

    Szafranko, E.

    2017-10-01

    In a construction business, one must oftentimes make decisions during all stages of a building process, from planning a new construction project through its execution to the stage of using a ready structure. As a rule, the decision making process is made more complicated due to certain conditions specific for civil engineering. With such diverse decision situations, it is recommended to apply various decision making support methods. Both, literature and hands-on experience suggest several methods based on analytical and computational procedures, some less and some more complex. This article presents the methods which can be helpful in supporting decision making processes in the management of civil engineering projects. These are multi-criteria methods, such as MCE, AHP or indicator methods. Because the methods have different advantages and disadvantages, whereas decision situations have their own specific nature, a brief summary of the methods alongside some recommendations regarding their practical applications has been given at the end of the paper. The main aim of this article is to review the methods of decision support and their analysis for possible use in the construction industry.

  20. THE MODELLING OF ORGANIZATIONAL STRUCTURES OF MANAGEMENT BY REALIZING INVESTMENT CONSTRUCTION PROJECTS

    Directory of Open Access Journals (Sweden)

    Олег Александрович КУЧМА

    2016-03-01

    Full Text Available The authors consider the modeling of organizational structures by virtue of interaction between the basic participants by realizing of investment construction projects. This process is directed at the complex analysis of a problem of quality management by creating of building goods taking into account modern project management tendencies. The topicality of problem is obvious as by realizing of investment construction projects there is a liberal share of uncompleted projects, and in the completed projects actual values considerably exceed budgeted capital expenditures. The introduced model allows managing the project per quality system in all phases of the investment construction project‘s life cycle. It promotes refinement of building goods, improves the rate of successfully completed projects with actual values near budgeted.

  1. A model for generating master surgical schedules to allow cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, J.M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    2005-01-01

    This paper addresses the problem of operating room scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time consuming tedious and complex task. The stochasticity of the durations of surgical procedures complicates

  2. Vehicle and driver scheduling for public transit.

    Science.gov (United States)

    2009-08-01

    The problem of driver scheduling involves the construction of a legal set of shifts, including allowance : of overtime, which cover the blocks in a particular vehicle schedule. A shift is the work scheduled to be performed by : a driver in one day, w...

  3. Clinch River breeder project gets boost

    International Nuclear Information System (INIS)

    Hill, W.H.

    1982-01-01

    Progress on the Clinch River Breeder Reactor Plant project, the United States' next step in developing liquid metal fast breeder technology is examined including consideration of Plant design, component fabrication and testing, construction schedule, funding, fuel cycle development and licensing. (U.K.)

  4. Major factors influencing craft productivity in nuclear power plant construction

    International Nuclear Information System (INIS)

    Borcherding, J.D.; Sebastian, S.J.

    1980-01-01

    This paper reports on a research study whose objective was to determine the most influential factors adversely affecting craft productivity in nuclear power plant construction from the perspective of the tradesmen employed at the sites. Data were collected through the use of a questionnaire survey and group interview sessions, predominantly with workmen, at six nuclear power plant construction projects. Craftsmen were chosen as the major data base because of their awareness of how their time would actually be spent on the project. Topics considered include the factors influencing craft productivity, material availability, redoing work, crew interfacing, overcrowded work areas, instruction time, inspection delays, craft turnover, craft absenteeism, foreman changes, foreman incompetence, engineering design lead time, comprehensive scheduling of the design function, the responsibility of the utility, value engineering, plant standardization, the effective utilization of the planning and scheduling system, and the labor-management committee

  5. Planning Complex Projects Automatically

    Science.gov (United States)

    Henke, Andrea L.; Stottler, Richard H.; Maher, Timothy P.

    1995-01-01

    Automated Manifest Planner (AMP) computer program applies combination of artificial-intelligence techniques to assist both expert and novice planners, reducing planning time by orders of magnitude. Gives planners flexibility to modify plans and constraints easily, without need for programming expertise. Developed specifically for planning space shuttle missions 5 to 10 years ahead, with modifications, applicable in general to planning other complex projects requiring scheduling of activities depending on other activities and/or timely allocation of resources. Adaptable to variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction.

  6. A conceptual model of psychological contracts in construction projects

    Directory of Open Access Journals (Sweden)

    Yongjian Ke

    2016-09-01

    Full Text Available The strategic importance of relationship style contracting is recognised in the construction industry. Both public and private sector clients are stipulating more integrated and collaborative forms of procurement. Despite relationship and integrated contractual arrangement being available for some time, it is clear that construction firms have been slow to adopt them. Hence it is timely to examine how social exchanges, via unwritten agreement and behaviours, are being nurtured in construction projects. This paper adopted the concept of Psychological Contracts (PC to describe unwritten agreement and behaviours. A conceptual model of the PC is developed and validated using the results from a questionnaire survey administered to construction professionals in Australia. The results uncovered the relationships that existed amongst relational conditions and relational benefits, the PC and the partners’ satisfaction. The results show that all the hypotheses in the conceptual model of the PC are supported, suggesting the PC model is important and may have an effect on project performance and relationship quality among contracting parties. A validated model of the PC in construction was then developed based on the correlations among each component. The managerial implications are that past relationships and relationship characteristics should be taken into account in the selection of procurement partners and the promise of future resources, support and tangible relational outcomes are also vital. It is important for contracting parties to pay attention to unwritten agreements (the PC and behaviours when managing construction projects.

  7. Software Schedules Missions, Aids Project Management

    Science.gov (United States)

    2008-01-01

    NASA missions require advanced planning, scheduling, and management, and the Space Agency has worked extensively to develop the programs and software suites necessary to facilitate these complex missions. These enormously intricate undertakings have hundreds of active components that need constant management and monitoring. It is no surprise, then, that the software developed for these tasks is often applicable in other high-stress, complex environments, like in government or industrial settings. NASA work over the past few years has resulted in a handful of new scheduling, knowledge-management, and research tools developed under contract with one of NASA s partners. These tools have the unique responsibility of supporting NASA missions, but they are also finding uses outside of the Space Program.

  8. Optimizing strategy software for repetitive construction projects within multi-mode resources

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-09-01

    Full Text Available Estimating tender data for specific project is the most essential part in construction areas as of contractor’s view such as: proposed project duration with corresponding gross value and cash flows. This paper focuses on how to calculate tender data using Optimizing Strategy Software (OSS for repetitive construction projects with identical activity’s duration in case of single number of crew such as: project duration, project/bid price, project maximum working capital, and project net present value of the studied project. A simplified multi-objective optimization software (OSS will be presented that creates best tender data to contractor compared with more feasible options generated from multi-mode resources in a given project. OSS is intended to give more scenarios which provide practical support for typical construction contractors who need to optimize resource utilization in order to minimize project duration, project/bid price, and project maximum working capital while maximizing its net present value simultaneously. OSS is designed by java programing code system to provide a number of new and unique capabilities, including: (1 Ranking the obtained optimal plans according to a set of planner specified weights representing the relative importance of duration, price, maximum working capital and net present value in the analyzed project; (2 Visualizing and viewing the generated optimal trade-off; and (3 Providing seamless integration with available project management calculations. In order to provide the aforementioned capabilities of OSS, the system is implemented and developed in four main modules: (1 A user interface module; (2 A database module; (3 A running module; (4 A connecting module. At the end of the paper, an illustrative example will be presented to demonstrate and verify the applications of the proposed software (OSS to an optimization expressway of repetitive construction project.

  9. Management of investment-construction projects basing on the matrix of key events

    Directory of Open Access Journals (Sweden)

    Morozenko Andrey Aleksandrovich

    2016-11-01

    Full Text Available The article considers the current problematic issues in the management of investment-construction projects, examines the questions of efficiency increase of construction operations on the basis of the formation of a reflex-adaptive organizational structure. The authors analyzed the necessity of forming a matrix of key events in the investment-construction project (ICP, which will create the optimal structure of the project, basing on the work program for its implementation. For convenience of representing programs of the project implementation in time the authors make recommendations to consolidate the works into separate, economically independent functional blocks. It is proposed to use an algorithm of forming the matrix of an investment-construction project, considering the economic independence of the functional blocks and stages of the ICP implementation. The use of extended network model is justified, which is supplemented by organizational and structural constraints at different stages of the project, highlighting key events fundamentally influencing the further course of the ICP implementation.

  10. Assessing Environmental Impact Indicators in Road Construction Projects in Developing Countries

    OpenAIRE

    Mohamed Marzouk; Mohamed El-zayat; Ahmed Aboushady

    2017-01-01

    Environmental pollution is considered to be one of the main concerns in the construction industry. Environmental pollution has become a major challenge to construction projects due to the huge amount of pollution caused by construction projects. There are different types of environmental impact indicators, such as the greenhouse gas (GHG) footprint, eutrophication potential (EP), acidification potential (AP), human health (HH) particulate, ozone depletion, and smog. Each of these environmenta...

  11. A Model Suggestion to Predict Leverage Ratio for Construction Projects

    Directory of Open Access Journals (Sweden)

    Özlem Tüz

    2013-12-01

    Full Text Available Due to the nature, construction is an industry with high uncertainty and risk. Construction industry carries high leverage ratios. Firms with low equities work in big projects through progress payment system, but in this case, even a small negative in the planned cash flows constitute a major risk for the company.The use of leverage, with a small investment to achieve profit targets large-scale, high-profit, but also brings a high risk with it. Investors may lose all or the portion of the money. In this study, monitoring and measuring of the leverage ratio because of the displacement in cash inflows of construction projects which uses high leverage and low cash to do business in the sector is targeted. Cash need because of drifting the cash inflows may be seen due to the model. Work should be done in the early stages of the project with little capital but in the later stages, rapidly growing capital need arises.The values obtained from the model may be used to supply the capital held in the right time by anticipating the risks because of the delay in cashflow of construction projects which uses high leverage ratio.

  12. Constructive use of holographic projections

    International Nuclear Information System (INIS)

    Schroer, Bert

    2008-01-01

    Revisiting the old problem of existence of interacting models of QFT with new conceptual ideas and mathematical tools, one arrives at a novel view about the nature of QFT. The recent success of algebraic methods in establishing the existence of factorizing models suggests new directions for a more intrinsic constructive approach beyond Lagrangian quantization. Holographic projection simplifies certain properties of the bulk theory and hence is a promising new tool for these new attempts. (author)

  13. Constructive use of holographic projections

    Energy Technology Data Exchange (ETDEWEB)

    Schroer, Bert [Centro Brasileiro de Pesquisas Fisicas (CBPF), Rio de Janeiro, RJ (Brazil); Institut fuer Theoretische Physik der FU, Berlin (Germany)

    2008-07-01

    Revisiting the old problem of existence of interacting models of QFT with new conceptual ideas and mathematical tools, one arrives at a novel view about the nature of QFT. The recent success of algebraic methods in establishing the existence of factorizing models suggests new directions for a more intrinsic constructive approach beyond Lagrangian quantization. Holographic projection simplifies certain properties of the bulk theory and hence is a promising new tool for these new attempts. (author)

  14. Final report Hanford environmental compliance project 89-D-172

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-01-01

    The Hanford Environmental Compliance (HEC) Project is unique in that it consisted of 14 subprojects which varied in project scope and were funded from more that one program. This report describes the HEC Project from inception to completion and the scope, schedule, and cost of the individual subprojects. Also provided are the individual subproject Cost closing statements and Project completion reports accompanied by construction photographs and illustrations

  15. Stakeholders Assessment of Constraints to Project Delivery in the Nigerian Construction Industry

    Directory of Open Access Journals (Sweden)

    Bruno L. Tanko

    2017-01-01

    Full Text Available The central goal of construction stakeholders is to successfully deliver projects to stated objective (s. However, for decades, construction projects have been plagued by perennial constraints of cost and time overruns, poor quality, and lack of sustainability. The objective of this paper is to identify and assess the constraints to construction project delivery, and to recommend solutions to enhance project performance. This paper adopted both quantitative and qualitative methods to establish the constraints in the Nigerian construction industry. A pilot survey and literature reviewed revealed a total of fifty (50 construction constraints, which were further classified into eight (8 major groups. Well-structured questionnaires were administered to construction stakeholders (client, consultant and contractor in Abuja, the federal capital city of Nigeria. Relative Importance Index (RII was used to analyze the data using Likert scale.  The results suggest that cost/time overrun related factors (inability to reduce project cost, Stakeholders interactive-related factors (inability to establish client value system, Client-related factors (Delay in interim payment and finance problem, and Labor/material-related factors (escalation of material prices and materials quality variability are the most prevalent constraints in the Nigerian construction environment.  To mitigate the effects of these challenges, it is suggested that a formal innovative approach should be used by stakeholders to address the problems of poor communication, high project cost, and delay. Clients should also take measures to provide adequate funding and should promptly honor interim certificates.

  16. Delivering construction projects using innovative building technologies

    CSIR Research Space (South Africa)

    Ampofo-Anti, Naalamkai

    2017-07-01

    Full Text Available . Figure 1: IBT delivery flowchart Proceedings 11th Built Environment Conference 6 th August – 8 th August 2017 Delivering construction projects using innovative building technologies Durban, South Africa 5. REFERENCES Ampofo-Anti, N...

  17. The impact of project management on nuclear construction lead times

    International Nuclear Information System (INIS)

    Radlaver, M.A.; Bauman, D.S.; Chapel, S.W.

    1985-01-01

    A two-year study of lead times for nuclear power plants found that construction time is affected by six fundamental influences. One of the six is project management. An analysis of construction management teams at 26 nuclear units found that many of the most successful shared five general characteristics: nuclear power experience, skill in project control, adaptability and initiative, commitment to success, and communication and coordination skill

  18. Positron--Electron Project (PEP)

    International Nuclear Information System (INIS)

    Rees, J.R.

    1977-01-01

    PEP, an 18-GeV electron-positron colliding-beam storage ring facility at SLAC, is being built by a team from LBL and SLAC. Construction is under way and completion is scheduled for Fall of 1979. A summary is given of the design of the facility, and the status of the project is reported

  19. TRIP RATES FOR CONDOMINIUM CONSTRUCTION PROJECT

    Directory of Open Access Journals (Sweden)

    Wirach Hirun

    2015-01-01

    Full Text Available The number of large scale condominium construction projects had dramatically increased in Bangkok. Many projects had occurred in either densely populated areas or in central business districts, where traffic conditions were usually highly congested. To prevent traffic problems, a traffic impact study must be prepared and submitted for review by concerned public authorities. Unit trip generation rates were important data in traffic impact analysis. Without accurate unit trip generation rates, public agencies could not obtain accurate information on the traffic that will be generated. This study aimed to study trip rates and the factors affecting them for condominium construction project in Bangkok. The data were collected from 30 condominium construction sites located in 15 districts of Bangkok. The analysis used the linear regression method and was divided into three cases: 1 trip rates for all vehicles, 2 trip rates for classified vehicles, and 3 trip rates for all types of condominium. All case analyses considered weekdays, Saturday, and Sunday. The results found that trip rates related to the number of dwellings in the condominium. The trip rates for all vehicle types on weekdays, Saturday, and Sunday were 10.636, 4.647, and 9.294 vehicles per 100 dwelling units per day respectively. The trip rates for six-wheeled and ten-wheeled trucks on weekdays, Saturday, and Sunday were 2.046, 0.975, and 0.575 vehicles per 100 dwelling units per day respectively. The trip rate for four-wheeled trucks and passenger cars on weekdays was 1.960. Regarding condominium types, the trip rate for low rise condominiums for all vehicle types on weekdays was 5.315 while the trip rates for high rise condominiums for weekdays, Saturday, and Sunday were 3.965, 2.667, and 1.261 respectively.

  20. Categorization of potential project cost overrun factors in construction industry

    Science.gov (United States)

    Karunakaran, P.; Abdullah, A. H.; Nagapan, S.; Sohu, S.; Kasvar, K. K.

    2018-04-01

    Cost overrun has been severely hit down the economy and reputations for many construction industry around the world. Many project management tools developed to control the budget of a project. However, the cost management is still considered poor as there are many cost overrun issues occurred in the construction industry. Thus, this paper aims to identify and cluster the potential construction project cost overrun factors according to their originating groups using the thematic approach. Basically, through literature review, all the potential factors that may cause cost overrun were screened thoroughly before they were clustered into seven (7) groups of the originating factors, namely project, contract, client, contractor, consultant, labour and external. Each potential factor was explained clearly with some examples based on the Malaysian case studies to illustrate the cost overrun scenario. These findings may aid in the future to highlight on how to mitigate the critical potential factors of cost overrun to reduce or overcome its impact on all the stakeholders involved.

  1. Project management in building industry management

    Directory of Open Access Journals (Sweden)

    Martin Nový

    2012-01-01

    Full Text Available The article deals with contents of the project management on general level first. It mentions the most widespread project management standards, which have historically developed in global scale, their parts and objectives. Further, it describes position of the building industry in national economy, its specific features distinguishing it from the other industrial production, contents of the building industry management and project management of structures. The importance of the role of project manager is documented by characteristics of construction projects, their course, contents of sub-phases, and individual types of managing activities. Attention is devoted to project planning – determination of realization costs, necessary resources, sequence and time course of individual works. The most frequently used graphic methods of schedule presentation – Gantt chart, network chart and frequency bar chart are applied on examples of constructions. These charts can be focused in time sequence on individual types of resources – workforce, finance, materials, energies, and machinery. In conclusion, necessity to manage the project management procedures is emphasized as a part of skills of a construction engineer in the role of preparation manager or construction project realization manager.

  2. AES, Automated Construction Cost Estimation System

    International Nuclear Information System (INIS)

    Holder, D.A.

    1995-01-01

    A - Description of program or function: AES (Automated Estimating System) enters and updates the detailed cost, schedule, contingency, and escalation information contained in a typical construction or other project cost estimates. It combines this information to calculate both un-escalated and escalated and cash flow values for the project. These costs can be reported at varying levels of detail. AES differs from previous versions in at least the following ways: The schedule is entered at the WBS-Participant, Activity level - multiple activities can be assigned to each WBS-Participant combination; the spending curve is defined at the schedule activity level and a weighing factor is defined which determines percentage of cost for the WBS-Participant applied to the schedule activity; Schedule by days instead of Fiscal Year/Quarter; Sales Tax is applied at the Line Item Level- a sales tax codes is selected to indicate Material, Large Single Item, or Professional Services; a 'data filter' has been added to allow user to define data the report is to be generated for. B - Method of solution: Average Escalation Rate: The average escalation for a Bill of is calculated in three steps. 1. A table of quarterly escalation factors is calculated based on the base fiscal year and quarter of the project entered in the estimate record and the annual escalation rates entered in the Standard Value File. 2. The percentage distribution of costs by quarter for the Bill of Material is calculated based on the schedule entered and the curve type. 3. The percent in each fiscal year and quarter in the distribution is multiplied by the escalation factor for the fiscal year and quarter. The sum of these results is the average escalation rate for that Bill of Material. Schedule by curve: The allocation of costs to specific time periods is dependent on three inputs, starting schedule date, ending schedule date, and the percentage of costs allocated to each quarter. Contingency Analysis: The

  3. 42 CFR 137.275 - May Self-Governance Tribes include IHS construction programs in a construction project agreement...

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self-Governance Tribes include IHS construction programs in a construction project agreement or in a funding...

  4. Adoption of value engineering: an attribute study for construction

    International Nuclear Information System (INIS)

    Shaikh, P.

    2015-01-01

    For economic reasons, engineers are compelled to explore low cost methods in construction industry to reduce the overall cost of a project. Research studies have been conducted in this regard throughout the world and value engineering is one of such approaches. Its effective use and applications reduces the project cost without compromising the project quality. Project cost, and efficient design alternatives can be identified using this technique, which will ultimately reduce the overall project cost. Client satisfaction, project reliability and quality can also be improved by the application of value engineering. It is also used for improving managerial performance, project schedule and reduced risks in a project. It is a powerful tool used to identify problems and recommend solutions. This paper highlights the importance of value engineering in general and with specific perspective of Construction Industry in Pakistan. Questionnaire based survey has been conducted by construction managers (i.e. project engineers, construction engineers, project managers, architects, etc.) through online web based system, as a result, random data sampling is achieved. The attributes are mapped to obtain goals for the project. The data has been analyzed through reliability and linear regression using SPSS while Z-Score and Average Index are conducted using MS Excel. The results showed that there is ample need to apply such techniques in initial phases of any project to get project benefits. (author)

  5. Industrial participation in TRISTAN project at KEK, Japan

    International Nuclear Information System (INIS)

    Ozaki, Satoshi.

    1990-01-01

    Industry-Laboratory collaborations played a very important role in the construction of TRISTAN electron-positron colliding beam facility, and brought this construction project to a successful completion in a scheduled time. What had motivated the collaborations, what were the important elements in the successful collaborations and how the collaborations worked will be given based on the authors experience as the TRISTAN Project Director. It is my pleasure to participate in this meeting of IISSC, and to present a talk on my experience with industry-laboratory cooperations in the construction of a major high energy accelerator facility in Japan; namely the TRISTAN electron-positron colliding beam facility project at KEK, (National Laboratory for High Energy Physics) in Tsukuba, Japan

  6. Project management lessons learned from building the Wendelstein 7-x stellerator fusion research reactor

    Energy Technology Data Exchange (ETDEWEB)

    Freire-Gormaly, M.; Gittens, A.; Zhang, L., E-mail: m.freire.gormaly@utoronto.ca, E-mail: antonio.gittens@mail.utoronto.ca, E-mail: lavender.zhang@outlook.com [University of Toronto, Toronto, ON (Canada)

    2015-07-01

    Wendelstein 7-X (W7-X) is the world's largest 'stellerator' nuclear fusion reactor being commissioned in Greifswald, Germany. It will inform the international fusion energy test device (ITER). The complexity of W7- X added challenges since industrial expertise to manufacture components did not exist. The construction was completed eight years behind schedule and almost 100% over budget. Key take-away lessons in project management were revealed from W7-X which can be applied to any nuclear project. These lessons are aligned with the project management knowledge areas of schedule, stakeholder, procurement, scope, schedule, cost, communication, risk, quality, human resources and procurement management. (author)

  7. Project management lessons learned from building the Wendelstein 7-x stellerator fusion research reactor

    International Nuclear Information System (INIS)

    Freire-Gormaly, M.; Gittens, A.; Zhang, L.

    2015-01-01

    Wendelstein 7-X (W7-X) is the world's largest 'stellerator' nuclear fusion reactor being commissioned in Greifswald, Germany. It will inform the international fusion energy test device (ITER). The complexity of W7- X added challenges since industrial expertise to manufacture components did not exist. The construction was completed eight years behind schedule and almost 100% over budget. Key take-away lessons in project management were revealed from W7-X which can be applied to any nuclear project. These lessons are aligned with the project management knowledge areas of schedule, stakeholder, procurement, scope, schedule, cost, communication, risk, quality, human resources and procurement management. (author)

  8. A project management quality cost information system for the construction industry

    OpenAIRE

    Love, PED; Irani, Z

    2003-01-01

    A prototype Project Management Quality Cost System (PROMQACS) was developed to determine quality costs in construction projects. The structure and information requirements that are needed to provide a classification system of quality costs were identified and discussed. The developed system was tested and implemented in two case study construction projects to determine the information and management issues needed to develop PROMQACS into a software program. In addition, the system was used to...

  9. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  10. A Procedure for scheduling and setting processing priority of MC requests

    CERN Document Server

    Balcar, Stepan

    2013-01-01

    My project contains designing and programming a base of an open system, which should help with the scheduling Monte Carlo production requests needed by the CMS physicists for data analysis within the CMS collaboration. A primary requirement was to create web interface that would be portable and independent of the control logic of the system. Another point of the project was to make a scheduler for the Monte Carlo production planning and to design and program interfaces between the various logical blocks of the system. Introduction Many research groups in CERN which specialize in different areas of particle physics works with CMS. They are mostly scientists working at universities or research institutes in their countries. Their research consists in constructing models of elementary particles and subsequent experimental verification of the behavior of these models. All these groups of people create MC production requests which are to be executed using computing resources located at CERN and other institutes. T...

  11. Cost Based Value Stream Mapping as a Sustainable Construction Tool for Underground Pipeline Construction Projects

    Directory of Open Access Journals (Sweden)

    Murat Gunduz

    2017-11-01

    Full Text Available This paper deals with application of Value Stream Mapping (VSM as a sustainable construction tool on a real construction project of installation of underground pipelines. VSM was adapted to reduce the high percentage of non-value-added activities and time wastes during each construction stage and the paper searched for an effective way to consider the cost for studied construction of underground pipeline. This paper is unique in its way that it adopts cost implementation of VSM to improve the productivity in underground pipeline projects. The data was observed and collected from site during construction, indicating the cycle time, value added and non-value added of each construction stage. The current state was built based on these details. This was an eye-opening exercise and a process management tool as a trigger for improvement. After the current state assessment, a future state is attempted by Value Stream Mapping tool balancing the resources using a Line of Balance (LOB technique. Moreover, a sustainable cost estimation model was developed during current state and future state to calculate the cost of underground pipeline construction. The result shows a cost reduction of 20.8% between current and future states. This reflects the importance of the cost based Value Stream Mapping in construction as a sustainable measurement tool. This new tool could be utilized in construction industry to add the sustainability and effective cost management.

  12. Environmental impact management during construction of the limestone project

    International Nuclear Information System (INIS)

    Windsor, D.C.

    1988-01-01

    The Limestone Generating Station is being constructed on the Nelson River in Northern Manitoba, and will consist of a 10 unit powerhouse, 5 gate concrete spillway and earthfill dam spanning the 1.5 km width of the Nelson River. Environmental concerns associated with the project included insufficient pre- and post-construction monitoring documenting resources present or magnitude of impacts, impacts on brook trout and lake sturgeon resources, wildlife habitat loss due to construction activities, destruction or disturbance of historic or archaeological sites, degradation of nearby water courses and fish habitat by aggregate removal, in-migration of construction personnel, and various other socio-economic impacts. An overview is provided of monitoring activities and results in the above areas, which involved numerous consultants and government agencies. The project administration and workers did not find the environmental programs, including inspection and enforcement activities, to be onerous or an impediment to the project. On the contrary, the environmental requirements assisted in the general planning for certain activities, and in the general criteria for the conduct of the activities. The work permit process was particularly useful as it defined the requirements of both parties and provided the specific standards necessary determining the acceptability of the activities. 14 refs., 1 fig

  13. Electric utility power plant construction costs, 1st Edition

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    New UDI report combines historical construction costs for more than 1,000 coal, oil, gas, nuclear and geothermal units that have entered commercial operation since 1966 and projected power plant construction costs for about 400 utility-owned generating units scheduled to enter commercial operation during the next 20 years. Key design characteristics and equipment suppliers, A/E, constructor and original installed cost data. Direct construction costs without AFUDC are provided where known. Historical construction cost data are also provided for about 130 utility-owned hydroelectric, gas turbine, combined-cycle and diesel units (these data are generally for units entering service after 1980)

  14. Intelligent Materials Tracking System for Construction Projects Management

    Directory of Open Access Journals (Sweden)

    Narimah Kasim

    2015-05-01

    Full Text Available An essential factor adversely affecting the performance of construction projects is the improper handling of materials during site activities. In addition, paper-based reports are mostly used to record and exchange information related to the material components within the supply chain, which is problematic and inefficient. Generally, technologies (such as wireless systems and RFID are not being adequately used to overcome human errors and are not well integrated with project management systems to make tracking and management of materials easier and faster. Findings from a literature review and surveys showed that there is a lack of positive examples of such tools having been used effectively. Therefore, this research focused on the development of a materials tracking system that integrates RFID-based materials management with resources modelling to improve on-site materials tracking. Rapid prototyping was used to develop the system and testing of the system was carried out to examine the functionality and working appropriately. The proposed system is intended to promote the employment of RFID for automatic materials tracking with integration of resource modelling (Microsoft (R Office Project in the project management system in order to establish which of the tagged components are required resources for certain project tasks. In conclusion, the system provides an automatic and easy tracking method for managing materials during materials delivery and inventory management processes in construction projects.

  15. Model for setting priority construction project objectives aligned with ...

    African Journals Online (AJOL)

    participants, including contractors, quantity surveyors, project managers, architects, and ..... (2004: 1) report that the global construction industry is plagued with ..... 1.2. Construction consultant/Developer. 2. 1.2. Engineering. 2. 1.2. Logistics. 2. 1.2 ...... supplychain/PPPFA%20-%20media.pdf> [Accessed: 2 June 2011].

  16. Tampa electric company - IGCC project. Quarterly report, January 1, 1996--March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    This quarterly report consists of materials presented at a recent review of the project. The project is an IGCC project being conducted by Tampa Electric Company. The report describes the status of the facility construction, components, operations staff training, and discusses aspects of the project which may impact the final scheduled completion.

  17. Technical program plan, Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    1979-12-01

    The Basalt Waste Isolation Project (BWIP) program as administered by the DOE's Richland Operations Office and Rockwell Hanford Operations is described. The objectives, scope and scientific technologies are discussed. The work breakdown structure of the project includes: project management and support, systems integration, geosciences, hydrology, engineered barriers, test facility design and construction, engineering testing, repository studies, and schedules. The budget of the program including operating and capital cost control is also included

  18. Akkuyu NPP – the first Turkish NPP. The new history of the project

    International Nuclear Information System (INIS)

    Tzocheva, V.

    2012-01-01

    An overview is given to the Turkish energy sector and nuclear power plans. The project for the construction of the first NPP in Turkey is presented. The general parameters of the Project are: CAPEX: $ 20 bln; Project design: NPP-2006; (VVER- 1200); Number of units: 4; Total capacity: 4 800 MW; Construction period: 2014 – 2023; PPA period; 15 years, fixed price terms. An account of the activities during 2011, the Worley Parsons participation are presented and a tentative project schedule is given

  19. Benefit Evaluation of Implementing BIM in Construction Projects

    Science.gov (United States)

    Chou, Hui-Yu; Chen, Pei-Yu

    2017-10-01

    Since 2014, public construction projects in Taiwan have progressively undertaken steps to promote the use of Building Information Modelling (BIM) technology, the use of BIM has therefore become a necessity for contractors. However, issues such as the high upfront costs relating to software and hardware setup and BIM user training, combined with the difficulties of incorporating BIM into existing workflow operations and management systems, remain a challenge to contractors. Consequently, the benefits stemming from the BIM implementation in turn will affect the activeness and enthusiasm of contractors to implement BIM. While there have been previous studies abroad where the benefits relating to BIM implementation had been calculated and quantified numerically, a benefit evaluation index would require considerations for regional industry practices and characteristics. This study established a benefit evaluation index and method for the implementation of BIM suitable for contractors in Taiwan. The three main principal indexes are: (1) RCR means the effects of reducing costs associated with rework; (2) SDR & DPR mean the effects of mitigating delays that occur due to construction interface coordination or rework, as well as the effects of reducing the penalty costs associated with overdue delivery; (3) AQE means the effects of improving the ability to estimate the amounts of building materials and resources. This study also performed a benefit evaluation calculation of a real world case study construction project using the first two established indexes. The results showed a 0.16% reduction in rework costs, a 6.49% reduction in delays that occur from construction interface coordination or rework, and a 5.0% reduction in penalty costs associated with overdue deliveries. The results demonstrated the applicability of the benefit evaluation index established in this study for real world construction projects.

  20. Project assessment for construction of new nuclear facility

    International Nuclear Information System (INIS)

    2013-01-01

    Project risk management is an important and integral part of project and quality management. It is also a key part of the due diligence process in making informed project decisions where in addition to the qualitative assessments quantitative ones shall be used to the extend practical. As part of the risk management process, risk identification, evaluation and mitigation must be an on-going activity at senior management levels throughout the planning, design, construction and commissioning phases of a new NPP

  1. Best Practice of Construction Waste Management and Minimization

    Directory of Open Access Journals (Sweden)

    Khor Jie Cheng

    2014-07-01

    Full Text Available Material management is an important issue as seen in construction waste management. Best practice of material management is accompanied by various benefits which are acknowledged by several studies. The site layout has particular effects on both materials and their waste through effective waste management practice. Ignoring the benefits of material management could result in a daily reduction in productivity of up to 40% by material wastage. Thus, the benefits of effective material management must be well comprehended for the sake of waste minimization. Another convincing fact about waste is that poor site management accounts for the largest factor of waste generation. Hence the site condition is very crucial in developing effective material management. Factors contributing to the efficiency of material management process are effective logistical management and supply chain management. The logistics system must be performing as schedule so that materials are wisely managed on-site without encountering presence of excessive materials. As materials management is closely related to logistics in construction projects, there will be delay in construction projects when materials are not delivered to site as scheduled. The management must be effective in terms of delivery, off-loading, storage, handling, on-site transportation and on-site utilization of materials.

  2. The Influence of Trust on Project Management Practice within the Construction Industry

    OpenAIRE

    Strahorn, Scott; Brewer, Graham; Gajendran, Thayaparan

    2017-01-01

    Given that any construction project is inherently a human endeavour, it follows that issues of trust are significant in terms of the stakeholder interactions that deliver eventual project outcomes.  Previous research indicates that the relational basis upon which projects are undertaken are intended to influence the likelihood of trusting relationships between stakeholders.  Thus, experiences of trust in a construction project environment are likely to be influenced by the contextual specific...

  3. Collaborative Management of Complex Major Construction Projects: AnyLogic-Based Simulation Modelling

    Directory of Open Access Journals (Sweden)

    Na Zhao

    2016-01-01

    Full Text Available Complex supply chain system collaborative management of major construction projects effectively integrates the different participants in the construction project. This paper establishes a simulation model based on AnyLogic to reveal the collaborative elements in the complex supply chain management system and the modes of action as well as the transmission problems of the intent information. Thus it is promoting the participants to become an organism with coordinated development and coevolution. This study can help improve the efficiency and management of the complex system of major construction projects.

  4. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  5. Project W-314 phase I environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, for Project W-314 activities in the Hanford Site's Tank Waste Remediation System. This document outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for waste feed delivery to proceed. This document also includes estimated costs and schedule to obtain the required permits and approvals based on the selected strategy. It also provides estimated costs for environmental support during design and construction based on the preliminary project schedule provided

  6. SSC spectre hovers over neutron project

    CERN Multimedia

    MacIlwain, C

    1999-01-01

    The 1.4 billion dollar project to build the world's most powerful neutron source at the Oak Ridge National laboratory, has fallen between 3 and 6 months behind schedule during its first year of construction. It now faces major difficulties in obtaini ng funding for next year (1 page).

  7. Relational approach in managing construction project safety: a social capital perspective.

    Science.gov (United States)

    Koh, Tas Yong; Rowlinson, Steve

    2012-09-01

    Existing initiatives in the management of construction project safety are largely based on normative compliance and error prevention, a risk management approach. Although advantageous, these approaches are not wholly successful in further lowering accident rates. A major limitation lies with the approaches' lack of emphasis on the social and team processes inherent in construction project settings. We advance the enquiry by invoking the concept of social capital and project organisational processes, and their impacts on project safety performance. Because social capital is a primordial concept and affects project participants' interactions, its impact on project safety performance is hypothesised to be indirect, i.e. the impact of social capital on safety performance is mediated by organisational processes in adaptation and cooperation. A questionnaire survey was conducted within Hong Kong construction industry to test the hypotheses. 376 usable responses were received and used for analyses. The results reveal that, while the structural dimension is not significant, the mediational thesis is generally supported with the cognitive and relational dimensions affecting project participants' adaptation and cooperation, and the latter two processes affect safety performance. However, the cognitive dimension also directly affects safety performance. The implications of these results for project safety management are discussed. Copyright © 2011 Elsevier Ltd. All rights reserved.

  8. Development of a system for managing document delivery schedule(DDS) for NSSS system design

    International Nuclear Information System (INIS)

    Baek, S. H.; Baek, J. M.; Sohn, Y. S.; Shon, G. H.

    1999-01-01

    The construction of nuclear power plant is a long-term project from initial design to commercial operation. To accomplish NSSS (Nuclear Steam Supply System) system design successfully, the systematic and effective method for managing the system design product and interface correspondence with other organizations is required. To meet this requirement, a system has been developed to control the document delivery schedule, approval process and interface correspondence transmittal, and to report the documentation status periodically from the beginning of the YGN 5 and 6 project. This system is expected to contribute as the beginning step to development of integrated project management system. (author)

  9. Identifying factors causing cost overrun of the construction projects ...

    Indian Academy of Sciences (India)

    Swapnil P Wanjari

    Cost overrun in India; ANOVA; factor analysis; construction projects. 1. Introduction ... gramme Implementation in India [2], projects of public .... case if a respondent never came across of such factor. ..... The co-relation matrix for variables of cost overruns was ..... There are various problems observed due to communication.

  10. The AP1000{sup R} China projects move forward to construction completion and equipment installation

    Energy Technology Data Exchange (ETDEWEB)

    Harrop, G. [Westinghouse Electric Company LLC, 1000 Westinghouse Drive, Cranberry Township, PA 16066 (United States)

    2012-07-01

    from the first-of-a-kind activities for Sanmen Unit 1 and AP1000 equipment design and manufacturing. For example, the nuclear island basemat at Haiyang Units 1 and 2 and Sanmen Unit 2 was laid in less time than that of Sanmen Unit 1, the ultra-large steam generator and RV forging lead times were reduced for the follow on units, and the fabrication of the auxiliary building module for Haiyang Unit 1 took less time than for the Sanmen first unit. These benefits are also being realized by the United States AP1000 project construction and fabrication modules, and equipment. Some difficulties arise from building this first-of-a-kind (advanced passive) type of plant; however, these difficulties are being overcome and the overall schedule remains achievable. (authors)

  11. Determining Success Criteria and Success Factors for International Construction Projects for Malaysian Contractors

    Directory of Open Access Journals (Sweden)

    Ali Mohammed Alashwal

    2017-06-01

    Full Text Available The success of international construction projects is fraught with various challenges such as competitiveness, lack of resources, versatile global economy, and specific conditions in the host country. Malaysian contractors have been venturing into global construction market since early 1980s. However, their venturing was not successful all the time. The number of international projects awarded to Malaysian contractors has reduced drastically during the past decade. Taking advantage of this experience, this paper aims to identify the success criteria and success factors of international construction projects. The data was collected from 120 respondents using a questionnaire survey and analysed using principal component analysis and regression analysis. The results revealed three principal criteria of project success namely, Management Success, Functional Success, and Organisation Success. The main components of success factors include Team Power and Skills, Resource Availability, External Environment, Organisation Capability, Project Support, and Project Organisation. Further analysis emphasized the importance of strong financing capacity of contractors, project social environment, and competence of the project manager in achieving project success. The results of this paper can serve as a guideline for contractors and project managers to achieve success in this context. Future studies may provide in-depth analysis of success criteria and success factors specific for construction project type and host-country location.

  12. A review of risk management process in construction projects of developing countries

    Science.gov (United States)

    Bahamid, R. A.; Doh, S. I.

    2017-11-01

    In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.

  13. Communication, coordination and cooperation in construction projects: business environment and human behaviours

    Science.gov (United States)

    Salah Alaloul, Wesam; Shahir Liew, Mohd; Zawawi, Noor Amila Wan

    2017-12-01

    The accomplishment of construction projects is extremely dependent on the integration of several stakeholders; therefore none of them has the control or the ability to accomplish the project alone. Each of them may influence and be influenced by the project management approach. There is no comprehensive theoretical platform for defining Communication, Coordination and Cooperation (3Cs) in the management of construction project. This paper deliberates the function of the 3Cs different theoretical perceptions. Through an analysis of selected articles from reputable academic journals in construction management, the business environment and human behaviour were identified as two main parts. A little has been done so far about the 3Cs, and how they are correlated with construction projects performance. Therefore, the objective of this paper is to explain the definitions and the association between the 3Cs. There is a significant link between communication and coordination. Coordination alternatively, is trust-based a logic of mutual and exchange. Consequently, cooperation is much more sophisticated, which needing more time and attempts.

  14. Managing large energy and mineral resources (EMR) projects in challenging environments

    Science.gov (United States)

    Chanmeka, Arpamart

    The viability of energy mineral resources (EMR) construction projects is contingent upon the state of the world economic climate. Oil sands projects in Alberta, Canada exemplify large EMR projects that are highly sensitive to fluctuations in the world market. Alberta EMR projects are constrained by high fixed production costs and are also widely recognized as one of the most challenging construction projects to successfully deliver due to impacts from extreme weather conditions, remote locations and issues with labor availability amongst others. As indicated in many studies, these hardships strain the industry's ability to execute work efficiently, resulting in declining productivity and mounting cost and schedule overruns. Therefore, to enhance the competitiveness of Alberta EMR projects, project teams are targeting effective management strategies to enhance project performance and productivity by countering the uniquely challenging environment in Alberta. The main purpose of this research is to develop industry wide benchmarking tailored to the specific constraints and challenges of Alberta. Results support quantitative assessments and identify the root causes of project performance and ineffective field productivity problems in the heavy industry sector capital projects. Customized metrics produced from the data collected through a web-based survey instrument were used to quantitatively assess project performance in the following dimensions: cost, schedule, change, rework, safety, engineering and construction productivity and construction practices. The system enables the industry to measure project performance more accurately, get meaningful comparisons, while establishing credible norms specific to Alberta projects. Data analysis to identify the root cause of performance problems was conducted. The analysis of Alberta projects substantiated lessons of previous studies to create an improved awareness of the abilities of Alberta-based companies to manage their

  15. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington

  16. Project management plan for the 105-C Reactor interim safe storage project. Revision 1

    International Nuclear Information System (INIS)

    Miller, R.L.

    1997-01-01

    In 1942, the Hanford Site was commissioned by the US Government to produce plutonium. Between 1942 and 1955, eight water-cooled, graphite-moderated reactors were constructed along the Columbia River at the Hanford Site to support the production of plutonium. The reactors were deactivated from 1964 to 1971 and declared surplus. The Surplus Production Reactor Decommissioning Project (BHI 1994b) will decommission these reactors and has selected the 105-C Reactor to be used as a demonstration project for interim safe storage at the present location and final disposition of the entire reactor core in the 200 West Area. This project will result in lower costs, accelerated schedules, reduced worker exposure, and provide direct benefit to the US Department of Energy for decommissioning projects complex wide. This project sets forth plans, organizational responsibilities, control systems, and procedures to manage the execution of the Project Management Plan for the 105-C Reactor Interim Safe Storage Project (Project Management Plan) activities to meet programmatic requirements within authorized funding and approved schedules. The Project Management Plan is organized following the guidelines provided by US Department of Energy Order 4700.1, Project Management System and the Richland Environmental Restoration Project Plan (DOE-RL 1992b)

  17. Critical Causes and Consequences of Construction Project Interruption: Client, Contractor, Consultant and External Factors Standpoints

    Directory of Open Access Journals (Sweden)

    Nurbasirah Mohamed Alias

    2013-09-01

    Full Text Available It should be pointed out that the dilemma of interruption and stoppage in the construction industry is a large-scale trend. Construction interruption and stoppage is considered one of the most recurring problems in the construction industry. Construction Interruption and stoppage is always measured as costly to all parties concerned in the projects and very often it will result in clash, claims, total desertion and much difficult for the feasibility and it slows the growth of construction sector. The objective of the research work that underpins this paper was to investigate the Factors and Consequences of construction projects on local contractors. A construction project is commonly acknowledged as successful when the aim of the project is achieved in terms of predetermined objectives that are mainly completed the project on time, within budget and specified quality in accordance with the specifications and to stakeholders’ satisfaction. One of the most important problems that may arise in the construction project is delays and the magnitude of these delays varies considerably from project to project. According to delay categories that were contractor related, client related, consultant related, labour related and external related, the study revealed the six major effects of delay that were time overrun, cost overrun, dispute, arbitration, total abandonment, and litigation.

  18. Identification of risk factors affecting construction of projects: The case of emerging economy

    Directory of Open Access Journals (Sweden)

    Chipo Mellania Maseko

    2017-12-01

    Full Text Available Controlling project risks has become a daunting task in construction and this can be attributed to issues such as the nature of modern projects. The challenge is that risk appears unannounced at any project phase for various reasons and thereby affecting the performance and the success of unprepared projects. The current studies that explored risk matters include Pehlivan and Öztemir (2015, Katre, and Ghaitidak (2016 amongst others. However, there is absence of unanimity from these studies on risk factors in construction. Thus, this article was instigated in order to identify and classify risk factors that affect the chances of project success. The research methodology selected for this article comprised of peer-reviewed articles between the periods of 2007 to 2017. This approach involved a comprehensive scrutiny into scholarly articles to comprehend risks in construction projects. Following a conceptual analysis, eighty factors were identified and classified under the following; technical, construction, financial, socio-political, physical, organisational, and environmental and other risks. From these categories, political instability was, found to be the most influential risk factor in construction projects and this factor was classified within the socio-political category and this category has total of 11 factors. Finding suggests the need for further empirical study.

  19. INFORMATION MODELING OF LIFE CYCLE OF HIGH-RISE CONSTRUCTION PROJECTS

    Directory of Open Access Journals (Sweden)

    Gusakova Elena Aleksandrovna

    2018-02-01

    Full Text Available To date, many years’ experience in the construction and operation of high-rise buildings has been accumulated. Its analysis reveals not only the engineering and organizational-technological specifics of such projects, but also systemic gaps in the field of management. In the implementation of large-scale and unique projects for high-rise buildings, the problems and tasks of improving approaches to managing the full life cycle of projects and methods, which will improve their competitiveness, become topical. The systems being used have largely exhausted their resource efficiency, which is associated with automation of traditional “inherited” processes and management structures, as well as development of IT-systems focused on digitalization of the activities of construction company, rather than the project. To solve these problems, it is proposed to carry out: reengineering of the schemes of information interaction between the project’s participants; formation of integrated digital environment for the life cycle of the project; development of systems for integrating data management and project management. Subject: problems, approaches and methods of digitalization of project’s life cycle management in relation to the specifics and features of high-rise buildings. Research objectives: substantiation of the most perspective approaches and methods of information modeling of high-rise construction as the basis for managing the full life cycle of the given project. Materials and methods: the experience of digitalization of design, construction, operation and development of high-rise buildings, presented in specialized literature, is analyzed. The methods for integrating information models of various stages of project’s life cycle and for information interaction of project’s participants are considered. Results: the concept of forming a single digital environment for the project is proposed, taking into account the features of the life

  20. Visualization of construction engineering

    International Nuclear Information System (INIS)

    Okada, Hisako; Miura, Jun

    2000-01-01

    It is required for nuclear power plant construction to reduce construction cost and shorten construction period. An early and accurate construction planning including schedule coordination among the companies has recently become more important and it is possible to obtain necessary information for construction planning in early stage. In this situation, we have been developing a visualization system for construction engineering for nuclear power plants. This system has an interface with the existing Plant Layout 3D-CAD system and consists of three sub systems: (1) Scheduling and simulation system, (2) Yard planning system and (3) Scaffolding planning system. This paper describes overview of this system. This visualization system is very helpful for construction engineers to easily understand situation and environment around installation area, to easily plan a work sequence and confirm the planned schedule, and it is also effective for customers and workers to understand the planning. As a result, this visualization system enables safety and high quality construction. (author)

  1. Evaluating construction projects of hotels based on environmental sustainability with MCDM framework

    Directory of Open Access Journals (Sweden)

    Sarfaraz Hashemkhani Zolfani

    2018-03-01

    Full Text Available Environmental issues have got incredible attention among daily life activities. Sustainability penetrated in all society practices specially construction industry due to its substantial impact on the environment. Monitoring and controlling architectural project contains a decision problem with multi-varieties analysis. This study aimed to evaluate construction projects of hotels regarding environmental sustainability. To this end, a hybrid Multiple Criteria Decision Making (MCDM model is proposed. Step‐wise Weight Assessment Ratio Analysis (SWARA and Complex proportional assessment (COPRAS compose a unified framework. A private construction project is supposed as a case study. The project is based on establishing a five star hotel in Tehran, Iran. In this research SWARA produces criteria weights and COPRAS will rank decision alternatives. This study can be a strategic route for other similar researches in other fields. Keywords: Architecture projects, Sustainability, Environmental sustainability, SWARA, COPRAS

  2. Management of difference in a nuclear power project

    International Nuclear Information System (INIS)

    Guo Ruiting

    2012-01-01

    The Thesis dissertate the application of Management of Difference in a Nuclear Power Project from nuclear safety regulation requirement, selection of a nuclear power plant site, engineering and procurement, construction, operation and maintenance, quality management, schedule management and experience feedback aspects. (author)

  3. Design iteration in construction projects – Review and directions

    Directory of Open Access Journals (Sweden)

    Purva Mujumdar

    2018-03-01

    Full Text Available Design phase of any construction project involves several designers who exchange information with each other most often in an unstructured manner throughout the design phase. When these information exchanges happen to occur in cycles/loops, it is termed as design iteration. Iteration is an inherent and unavoidable aspect of any design phase which requires proper planning. Till date, very few researchers have explored the design iteration (“complexity” in construction sector. Hence, the objective of this paper was to document and review the complexities of iteration during design phase of construction projects for efficient design planning. To achieve this objective, exhaustive literature review on design iteration was done for four sectors – construction, manufacturing, aerospace, and software development. In addition, semi-structured interviews and discussions were done with a few design experts to verify the different dimensions of iteration. Finally, a design iteration framework was presented in this study that facilitates successful planning. Keywords: Design iteration, Types of iteration, Causes and impact of iteration, Models of iteration, Execution strategies of iteration

  4. Engineer, procure, construct (EPC) for nuclear projects in OPG

    Energy Technology Data Exchange (ETDEWEB)

    Elliott, M. [Ontario Power Generation, Toronto, Ontario (Canada)

    2011-07-01

    OPG is exploring the use of EPC contracts for Nuclear Plant Design Modifications. Although OPG has used EPC outside of the nuclear island, this new initiative will begin to use EPC inside the plant, including upgrades to existing stations and mid-life refurbishment of Darlington. Benchmarking has shown that apart from new build, nuclear utilities rarely use this method inside the plant so OPG is using a step-by-step approach starting with projects with low complexity and low plant impact. The expected benefits are reduced interfaces and a simplified accountability model leading to schedule and cost improvements and lower rework. Design packages that incorporate construction input before issue will be a significant improvement. OPG's early challenges in moving to EPC include clearly defining roles, responsibilities and interfaces between the vendors and OPG, and modifying governance to match the new model. OPG intends to oversee the work while holding the vendor accountable for needs skill development on both sides. Vendors are expected to establish an engaged organization with complete knowledge of plant conditions, processes and streamlined methods to gain operations input. Vendors are also expected to identify and fix any quality issues before the modifications are commissioned and to have an in-house corrective action program to continuously improve. Vendors' early challenges include presenting one face to OPG rather than a collection of joint venture partners. This presentation describes OPG's plans and early feedback on this exciting new initiative.

  5. Engineer, procure, construct (EPC) for nuclear projects in OPG

    International Nuclear Information System (INIS)

    Elliott, M.

    2011-01-01

    OPG is exploring the use of EPC contracts for Nuclear Plant Design Modifications. Although OPG has used EPC outside of the nuclear island, this new initiative will begin to use EPC inside the plant, including upgrades to existing stations and mid-life refurbishment of Darlington. Benchmarking has shown that apart from new build, nuclear utilities rarely use this method inside the plant so OPG is using a step-by-step approach starting with projects with low complexity and low plant impact. The expected benefits are reduced interfaces and a simplified accountability model leading to schedule and cost improvements and lower rework. Design packages that incorporate construction input before issue will be a significant improvement. OPG's early challenges in moving to EPC include clearly defining roles, responsibilities and interfaces between the vendors and OPG, and modifying governance to match the new model. OPG intends to oversee the work while holding the vendor accountable for needs skill development on both sides. Vendors are expected to establish an engaged organization with complete knowledge of plant conditions, processes and streamlined methods to gain operations input. Vendors are also expected to identify and fix any quality issues before the modifications are commissioned and to have an in-house corrective action program to continuously improve. Vendors' early challenges include presenting one face to OPG rather than a collection of joint venture partners. This presentation describes OPG's plans and early feedback on this exciting new initiative.

  6. Technical management of difference in CEPR nuclear power project

    International Nuclear Information System (INIS)

    Guo Ruiting

    2014-01-01

    The Thesis dissertate the application of technical management of difference in CEPR Nuclear Power Project from EPR technical bases, condition of a nuclear power plant site, engineering and procurement, construction, quality management, schedule management and experience feedback aspects. (author)

  7. MEASURING THE PERFORMANCE OF GUYANA’S CONSTRUCTION INDUSTRY USING A SET OF PROJECT PERFORMANCE BENCHMARKING METRICS

    Directory of Open Access Journals (Sweden)

    Christopher J. Willis

    2011-10-01

    Full Text Available A study measuring the performance of Guyana’s construction industry using a set of project performance benchmarking metrics was recently completed. The underlying premise of the study was that the aggregated performance of construction projects provides a realistic assessment of the performance of the construction industry, on the basis that construction projects are the mechanism through which the construction industry creates its tangible products. The fact that an influential government agency acted as owner of the study was critical to the data collection phase. The best approach for collecting project performance data in Guyana involves the utilisation of a researcher or team of researchers mining electronic and hard copy project documents. This study analysed approximately 270 construction projects to obtain an indication of the performance of guyana’s construction industry. It was found that sea defence projects performed the worst, whereas health facility projects performed the best. The main implication of this is that sea defence projects are likely to be the least efficient and, given their critical nature, there is an argument for urgent performance improvement interventions.

  8. Risk assessment framework on time impact: Infrastructure projects in soft soil during construction stage

    Science.gov (United States)

    Low, W. W.; Wong, K. S.; Lee, J. L.

    2018-04-01

    With the growth of economy and population, there is an increase in infrastructure construction projects. As such, it is unavoidable to have construction projects on soft soil. Without proper risk management plan, construction projects are vulnerable to different types of risks which will have negative impact on project’s time, cost and quality. Literature review showed that little or none of the research is focused on the risk assessment on the infrastructure project in soft soil. Hence, the aim of this research is to propose a risk assessment framework in infrastructure projects in soft soil during the construction stage. This research was focused on the impact of risks on project time and internal risk factors. The research method was Analytical Hierarchy Process and the sample population was experienced industry experts who have experience in infrastructure projects. Analysis was completed and result showed that for internal factors, the five most significant risks on time element are lack of special equipment, potential contractual disputes and claims, shortage of skilled workers, delay/lack of materials supply, and insolvency of contractor/sub-contractor. Results indicated that resources risk factor play a critical role on project time frame in infrastructure projects in soft soil during the construction stage.

  9. Attribute Hierarchy of Conflicts in Construction Projects: A Case Study of Sindh

    Directory of Open Access Journals (Sweden)

    Shabbir Hussain Khahro

    2015-10-01

    Full Text Available Conflicts seem to arise throughout the life cycle of the construction project and in result, these may lead to several other issues such as project cost overrun, time overrun, productivity loss, loss of profit and above all damage of business relationships in general and specifically in construction industry. Hence, this paper focuses on various direct and indirect causes leading to conflicts in construction industry of Sindh, Pakistan. Detailed literature review and interviews have been carried out to identify several direct and indirect causes of conflicts and finally, a set of questionnaire has been designed and distributed to get expert opinion on the significance of these causes in this sector. The data has been analyzed by RIW (Relative Importance Weight method. The outcome of this study shows that payment delay is the major direct cause of conflicts in the construction projects followed by contractual claims, public interruption, poor communication and site conditions. Thus, it is suggested that proper attention should be given to the above mentioned concerns so as to have a uniform flow of construction project life cycle without any interruption.

  10. EoC Study Update to Examine the Cost, Schedule and Technical Changes to NASA Projects

    Science.gov (United States)

    Bitten, Bob; Emmons, Debra; Shinn, Stephen; Scolese, Chris

    2018-01-01

    The original National Aeronautics and Space Administration (NASA) Explanation of Change (EoC) study was conducted in 2010 to understand the underlying causes of cost and schedule growth. The first study consisted of 25 missions launched from 2000 to 2010 and looked at the events that led to growth. These events were categorized into different bins that were rolled up to quantify whether the growth was due to internal planning, or internal execution, or from external forces and found that the growth was evenly distributed among those three categories. The result of the study presented nine considerations focused at reducing growth due to project external events and internal planning events. Although no one 'magic bullet' consideration was discovered in the previous work, the nine considerations taken as a whole were postulated to help reduce cost and schedule change in future NASA missions. A recent update was conducted that included investigating 8 missions developed since the previous study to determine if the results were different. Cost, schedule, and mass increases were analyzed from the start of Phase B through Preliminary Design Review and Critical Design Review to Launch. As shown in this paper, the results are better with overall cost and schedule growth being reduced. The paper will show a comparison of the previous results to the updated results to show specific reductions and provide an explanation of which recommendations were followed.

  11. Identifying the most critical project complexity factors using Delphi method: the Iranian construction industry

    Directory of Open Access Journals (Sweden)

    Mohammad Mehdi Mozaffari

    2012-09-01

    Full Text Available Complexity is one of the most important issues influencing success of any construction project and there are literally different studies devoted to detect important factors increasing complexity of projects. During the past few years, there have been growing interests in developing mass construction projects in Iran. The proposed study of this paper uses Delphi technique to find out about important factors as barriers of construction projects in Iran. The results show that among 47 project complexity factors, 19 factors are more important than others are. The study groups different factors into seven categories including environmental, organizational, objectives, tasks, stakeholders, technological, information systems and determines the relative importance of each. In each group, many other sub group activities are determined and they are carefully investigated. The study provides some detailed suggestions on each category to reduce the complexity of construction project.

  12. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program

  13. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  14. Modeling Manpower and Equipment Productivity in Tall Building Construction Projects

    Science.gov (United States)

    Mudumbai Krishnaswamy, Parthasarathy; Rajiah, Murugasan; Vasan, Ramya

    2017-12-01

    Tall building construction projects involve two critical resources of manpower and equipment. Their usage, however, widely varies due to several factors affecting their productivity. Currently, no systematic study for estimating and increasing their productivity is available. What is prevalent is the use of empirical data, experience of similar projects and assumptions. As tall building projects are here to stay and increase, to meet the emerging demands in ever shrinking urban spaces, it is imperative to explore ways and means of scientific productivity models for basic construction activities: concrete, reinforcement, formwork, block work and plastering for the input of specific resources in a mixed environment of manpower and equipment usage. Data pertaining to 72 tall building projects in India were collected and analyzed. Then, suitable productivity estimation models were developed using multiple linear regression analysis and validated using independent field data. It is hoped that the models developed in the study will be useful for quantity surveyors, cost engineers and project managers to estimate productivity of resources in tall building projects.

  15. The tail wags the dog: managing large telescope construction projects with lagging requirements and creeping scope

    Science.gov (United States)

    Warner, Mark

    2014-08-01

    In a perfect world, large telescopes would be developed and built in logical, sequential order. First, scientific requirements would be agreed upon, vetted, and fully developed. From these, instrument designers would define their own subsystem requirements and specifications, and then flesh out preliminary designs. This in turn would then allow optic designers to specify lens and mirror requirements, which would permit telescope mounts and drives to be designed. Finally, software and safety systems, enclosures and domes, buildings, foundations, and infrastructures would be specified and developed. Unfortunately, the order of most large telescope projects is the opposite of this sequence. We don't live in a perfect world. Scientists usually don't want to commit to operational requirements until late in the design process, instrument designers frequently change and update their designs due to improving filter and camera technologies, and mount and optics engineers seem to live by the words "more" and "better" throughout their own design processes. Amplifying this is the fact that site construction of buildings and domes are usually the earliest critical path items on the schedule, and are often subject to lengthy permitting and environmental processes. These facility and support items therefore must quickly get underway, often before operational requirements are fully considered. Mirrors and mounts also have very long lead times for fabrication, which in turn necessitates that they are specified and purchased early. All of these factors can result in expensive and time-consuming change orders when requirements are finalized and/or shift late in the process. This paper discusses some of these issues encountered on large, multi-year construction projects. It also presents some techniques and ideas to minimize these effects on schedule and cost. Included is a discussion on the role of Interface Control Documents (ICDs), the importance (and danger) of making big

  16. Advances in technology for the construction of deep-underground facilities

    Energy Technology Data Exchange (ETDEWEB)

    1987-12-31

    The workshop was organized in order to address technological issues important to decisions regarding the feasibility of strategic options. The objectives of the workshop were to establish the current technological capabilities for deep-underground construction, to project those capabilities through the compressed schedule proposed for construction, and to identify promising directions for timely allocation of existing research and development resources. The earth has been used as a means of protection and safekeeping for many centuries. Recently, the thickness of the earth cover required for this purpose has been extended to the 2,000- to 3,000-ft range in structures contemplated for nuclear-waste disposal, energy storage, and strategic systems. For defensive missile basing, it is now perceived that the magnitude of the threat has increased through better delivery systems, larger payloads, and variable tactics of attack. Thus, depths of 3,000 to 8,000 ft are being considered seriously for such facilities. Moreover, it appears desirable that the facilities be operational (if not totally complete) for defensive purposes within a five-year construction schedule. Deep excavations such as mines are similar in many respects to nearsurface tunnels and caverns for transit, rail, sewer, water, hydroelectric, and highway projects. But the differences that do exist are significant. Major distinctions between shallow and deep construction derive from the stress fields and behavior of earth materials around the openings. Different methodologies are required to accommodate other variations resulting from increased depth, such as elevated temperatures, reduced capability for site exploration, and limited access during project execution. This report addresses these and other questions devoted to geotechnical characterization, design, construction, and excavation equipment.

  17. Short-term scheduling of an open-pit mine with multiple objectives

    Science.gov (United States)

    Blom, Michelle; Pearce, Adrian R.; Stuckey, Peter J.

    2017-05-01

    This article presents a novel algorithm for the generation of multiple short-term production schedules for an open-pit mine, in which several objectives, of varying priority, characterize the quality of each solution. A short-term schedule selects regions of a mine site, known as 'blocks', to be extracted in each week of a planning horizon (typically spanning 13 weeks). Existing tools for constructing these schedules use greedy heuristics, with little optimization. To construct a single schedule in which infrastructure is sufficiently utilized, with production grades consistently close to a desired target, a planner must often run these heuristics many times, adjusting parameters after each iteration. A planner's intuition and experience can evaluate the relative quality and mineability of different schedules in a way that is difficult to automate. Of interest to a short-term planner is the generation of multiple schedules, extracting available ore and waste in varying sequences, which can then be manually compared. This article presents a tool in which multiple, diverse, short-term schedules are constructed, meeting a range of common objectives without the need for iterative parameter adjustment.

  18. CMS Planning and Scheduling System

    CERN Document Server

    Kotamaki, M

    1998-01-01

    The paper describes the procedures and the system to build and maintain the schedules needed to manage time, resources, and progress of the CMS project. The system is based on the decomposition of the project into work packages, which can be each considered as a complete project with its own structure. The system promotes the distribution of the decision making and responsibilities to lower levels in the organisation by providing a state-of-the-art system to formalise the external commitments of the work packages without limiting their ability to modify their internal schedules to best meet their commitments. The system lets the project management focus on the interfaces between the work packages and alerts the management immediately if a conflict arises. The proposed system simplifies the planning and management process and eliminates the need for a large, centralised project management system.

  19. AUTOCAD IN THE OPERATIONAL MANAGEMENT OF THE CONSTRUCTION SITE

    Directory of Open Access Journals (Sweden)

    Tsareva Marina Vladimirovna

    2016-04-01

    Full Text Available Operational management of the construction is usually based on information analysis systems, which are aimed at the monitoring of working schedule and volumes as consistent with predicated schedules. The result of such systems’ operation is traditional information graphics (diagrams, charts, etc., which provides idea on the current state of the construction site and deviations from the planned settings. The author considers the visualization technology of construction of objects using an image of the situation on the AutoCAD drawings, converted into an interactive format. The article focuses on imperfections of the existing technologies of information support of the managers. The creation of unified IT platform is offered on the basis of CAD for creating an integrated information storage and visualization of the environment using electronic drawings and diagrams. Using interactive methods it is possible to illustrate the condition of almost any part of the construction project using these drawings and diagrams. E-drawings contain the basic information resources - estimates, plans, sections, specifications, technology, construction, etc. necessary for the calculation of indicators. The author proved that implementation of visualization is most efficient in case of electronic drawings in 3D format.

  20. Environmental monitoring master sampling schedule, January--December 1990

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1990-01-01

    Environmental monitoring of the Hanford Site is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for calendar year 1990 for the Environment Surveillance and Ground-Water Monitoring Projects. This schedule is subject to modification during the year in response to changes in Site operations, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs. This schedule includes ground-water sampling performed by PNL for environmental surveillance of the Hanford Site.

  1. Project safety as a sustainable competitive advantage.

    Science.gov (United States)

    Rechenthin, David

    2004-01-01

    To be consistently profitable, a construction company must complete projects in scope, on schedule, and on budget. At the same time, the nature of the often high-risk work performed by construction companies can result in high accident rates. Clients and other stakeholders are placing increasing pressure on companies to decrease those accident rates. Clients routinely demand copies of safety plans and evidence of past results at the "pre-qualification" or "request for proposal" stages of the procurement process. Are high accident rates and the associated costs just a part of business? Companies that deliver on scope, schedule, and budget have a competitive advantage. Is it possible for projects with low accident rates to use it as a competitive advantage? Is the value added by safety just a temporary or parity issue, or does a successful safety program offer significant advantage to the company and the client? This article concludes that in the case of a high-risk industry, such as the construction industry, an organization with a successful safety program can promote safety performance as a sustainable competitive advantage. It is a choice the company can make.

  2. JET Project: progress in construction and management

    International Nuclear Information System (INIS)

    Bertolini, E.

    1978-01-01

    The JET Project of the European Community aims to construct and operate one of the largest Tokamak Devices foreseen at present in the field of Fusion Research. The aim of the experiment is to produce and study plasma conditions approaching those needed in a thermonuclear reactor and therefore will involve operation with deuterium--tritium gas

  3. 42 CFR 137.329 - What environmental considerations must be included in the construction project agreement?

    Science.gov (United States)

    2010-10-01

    ... must be included in the construction project agreement? The construction project agreement must include..., and (d) An assurance that no action will be taken on the construction phase of the project that would... 42 Public Health 1 2010-10-01 2010-10-01 false What environmental considerations must be included...

  4. Magnetohydrodynamics MHD Engineering Test Facility ETF 200 MWe power plant. Conceptual Design Engineering Report CDER. Volume 3: Costs and schedules

    Science.gov (United States)

    1981-01-01

    The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.

  5. Construction management of Indian pressurized heavy water reactors

    International Nuclear Information System (INIS)

    Bohra, S.A.; Sharma, P.D.

    2006-01-01

    Pandit Jawaharlal Nehru and Dr. Homi J. Bhabha, the visionary architects of Science and Technology of modern India foresaw the imperative need to establish a firm base for indigenous research and development in the field of nuclear electricity generation. The initial phase has primarily focused on the technology development in a systematic and structured manner, which has resulted in establishment of strong engineering, manufacturing and construction base. The nuclear power program started with the setting up of two units of boiling light water type reactors in 1969 for speedy establishment of nuclear technology, safety culture, and development of operation and maintenance manpower. The main aim at that stage was to demonstrate (to ourselves, and indeed to the rest of the world) that India, inspite of being a developing country, with limited industrial infrastructure and low capacity power grids, could successfully assimilate the high technology involved in the safe and economical operation of nuclear power reactors. The selection of a BWR was in contrast to the pressurized heavy water reactors (PHWR), which was identified as the flagship for the first stage of India's nuclear power program. The long-term program in three stages utilizes large reserves of thorium in the monazite sands of Kerala beaches in the third stage with first stage comprising of series of PHWR type plants with a base of 10,000 MW. India has at present 14 reactors in operation 12 of these being of PHWR type. The performance of operating units of 2720 MW has improved significantly with an overall capacity factor of about 90% in recent times. The construction work on eight reactor units with installed capacity of 3960 MW (two PHWRs of 540 MW each, four PHWRs of 220 MW each and two VVERs of 1000 MW each) is proceeding on a rapid pace with project schedules of less than 5 years from first pour of concrete. This is being achieved through advanced construction technology and management. Present

  6. Estimating Required Contingency Funds for Construction Projects using Multiple Linear Regression

    National Research Council Canada - National Science Library

    Cook, Jason J

    2006-01-01

    Cost overruns are a critical problem for construction projects. The common practice for dealing with cost overruns is the assignment of an arbitrary flat percentage of the construction budget as a contingency fund...

  7. The Healy clean coal project: An overview

    Energy Technology Data Exchange (ETDEWEB)

    Olson, J.B.; McCrohan, D.V. [Alaska Industrial Development and Export Authority, Anchorage, AK (United States)

    1997-12-31

    The Healy Clean Coal Project, selected by the US Department of Energy under Round III of the Clean Coal Technology Program is currently in construction. The project is owned and financed by the Alaska Industrial Development and Export Authority (AIDEA), and is cofunded by the US Department of Energy. Construction is scheduled to be completed in August of 1997, with startup activity concluding in December of 1997. Demonstration, testing and reporting of the results will take place in 1998, followed by commercial operation of the facility. The emission levels of NOx, SO{sub 2} and particulates from this 50 megawatt plant are expected to be significantly lower than current standards. The project status, its participants, a description of the technology to be demonstrated, and the operational and performance goals of this project are presented.

  8. Schedule and cost reduction of nuclear generating facilities in Ontario study overview

    International Nuclear Information System (INIS)

    Huterer, J.

    1991-01-01

    During the five year period 1985 to 1990, Ontario Hydro conducted a major study with the objective to reduce the cost and construction duration for future nuclear generating facilities in Ontario. This paper reports on the study called Major Projects: Schedule and Cost Reduction Study (SCRS). Ontario Hydro is a public utility with the responsibility for meeting electricity need for the province of Ontario with a population of 9.6 million. In order to adequately address future electricity needs, Ontario Hydro has developed and submitted a demand/supply plan which covers the next 25 years. The SCRS for major projects contributed to this demand/supply plan

  9. Distributing Resources in a Construction Project

    DEFF Research Database (Denmark)

    Axel, Erik

    2015-01-01

    In the present paper the status of theories are discussed. It will be based on the fact that our understanding comes out of our common activity, and we will take point of departure in some empirical material from a construction project. We shall explore a conception of conflictual cooperation, wh...... that accordingly theories must change with the process, that they are dissolving in praxis. Keywords: arrangement, common cause, concept, conflictual cooperation, contradictions, design of square, praxis, procedure, resources, theory....

  10. 1995 project of the year Hanford Environmental compliance project nomination

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders` objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring.

  11. 1995 project of the year Hanford Environmental compliance project nomination

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders' objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring

  12. The Application of the Real Options Method for the Evaluation of High-Rise Construction Projects

    Science.gov (United States)

    Izotov, Aleksandr; Rostova, Olga; Dubgorn, Alissa

    2018-03-01

    The paper is devoted to the problem of evaluation of high-rise construction projects in a rapidly changing environment. The authors proposed an algorithm for constructing and embedding real options in high-rise construction projects, which makes it possible to increase the flexibility of managing multi-stage projects that have the ability to adapt to changing conditions of implementation.

  13. Research on Risk Manage of Power Construction Project Based on Bayesian Network

    Science.gov (United States)

    Jia, Zhengyuan; Fan, Zhou; Li, Yong

    With China's changing economic structure and increasingly fierce competition in the market, the uncertainty and risk factors in the projects of electric power construction are increasingly complex, the projects will face huge risks or even fail if we don't consider or ignore these risk factors. Therefore, risk management in the projects of electric power construction plays an important role. The paper emphatically elaborated the influence of cost risk in electric power projects through study overall risk management and the behavior of individual in risk management, and introduced the Bayesian network to the project risk management. The paper obtained the order of key factors according to both scene analysis and causal analysis for effective risk management.

  14. Environmental monitoring master sampling schedule: January--December 1989

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1989-01-01

    Environmental monitoring of the Hanford Site is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for calendar year 1989 for the Surface and Ground-Water Environmental Monitoring Projects. This schedule is subject to modification during the year in response to changes in Site operations, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. This schedule includes routine ground-water sampling performed by PNL for Westinghouse Hanford Company, but does not include samples that may be collected in 1989 to support special studies or special contractor projects, or for quality control. The sampling schedule for Site-wide chemical monitoring is not included here, because it varies each quarter as needed, based on past results and operating needs. This schedule does not include Resource Conservation and Recovery Act ground-water sampling performed by PNL for Hanford Site contractors, nor does it include sampling that may be done by other DOE Hanford contractors

  15. Project Culture in the Chinese Construction Industry: Perceptions of Contractors

    Directory of Open Access Journals (Sweden)

    Jian Zou

    2012-11-01

    Full Text Available In recent years culture has become one of the most studied topicsin project management research. Some studies have investigatedthe infl uence of culture at different levels – such as nationalculture, industry culture, organisational culture and professionalculture. As a project-based industry, the construction industryneeds to have more insight concerning cultural issues at theproject level and their infl uence on the performance of constructionprojects. Few studies, however, have focused on culture at theproject level. This paper uses a questionnaire survey to determinethe perceptions of Chinese contractors about the impact of projectculture on the performance of local construction projects. This isaugmented by a series of in-depth interviews with senior executivemanagers in the industry. The fi ndings indicate that specifi c projectculture does contribute signifi cantly towards project outcomes.In particular, goal orientation and fl exibility, as two dimensionsof project culture, have a negative statistical correlation withperceived satisfaction of the process, commercial success, futurebusiness opportunities, lessons learnt from the project, satisfactionwith the relationships, and overall performance. This paper alsoindicates that the affordability of developing an appropriate projectculture is a major concern for industry practitioners.

  16. Recruitment schemes in new nuclear projects

    International Nuclear Information System (INIS)

    Tielas, M.

    2012-01-01

    Contracting in New Nuclear Projects: A collaborative model between the Owner and the Supplier is described for building nuclear power plants, and is being implemented in the USA as well as in Europe to solve the problem of the risk in the initial investment as experienced in the past: widely exceeded budgets and construction schedules. (Author)

  17. Scheduling lessons learned from the Autonomous Power System

    Science.gov (United States)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  18. 42 CFR 137.353 - What is contained in a construction project financial report?

    Science.gov (United States)

    2010-10-01

    ... financial report? 137.353 Section 137.353 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... § 137.353 What is contained in a construction project financial report? Construction project financial reports contain information regarding the amount of funds expended during the reporting period, and...

  19. The study of the risk management model of construction project

    International Nuclear Information System (INIS)

    Jiang Bo; Feng Yanping; Liu Changbin

    2010-01-01

    The paper first analyzed the development of the risk management of construction project and the risk management processes, and then briefly introduced the risk management experience of foreign project management. From the project management by objectives point of view, the greatest risk came from the lack of clarity of the objectives in the project management, which led to the project's risk emergence. In the analysis of the principles of the project objectives identification and risk allocation, the paper set up a project management model which insurance companies involved in the whole process of the project management, and simply analyzed the roles of insurance company at last. (authors)

  20. Project W-521, waste feed delivery systems environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document has been prepared to define the specific environmental requirements applicable to Project W-521. The document describes the permits and approvals necessary for the project to design, construct, and install planned upgrades, and provides a schedule of activities and provides cost estimates to complete the required permitting and approval activities

  1. Identification of Tools and Techniques to Enhance Interdisciplinary Collaboration During Design and Construction Projects.

    Science.gov (United States)

    Keys, Yolanda; Silverman, Susan R; Evans, Jennie

    2017-10-01

    The purpose of this study was to collect the perceptions of design professionals and clinicians regarding design process success strategies and elements of interprofessional engagement and communication during healthcare design and construction projects. Additional objectives were to gather best practices to maximize clinician engagement and provide tools and techniques to improve interdisciplinary collaboration for future projects. Strategies are needed to enhance the design and construction process and create interactions that benefit not only the project but the individuals working to see its completion. Meaningful interprofessional collaboration is essential to any healthcare design project and making sure the various players communicate is a critical element. This was a qualitative study conducted via an online survey. Respondents included architects, construction managers, interior designers, and healthcare personnel who had recently been involved in a building renovation or new construction project for a healthcare facility. Responses to open-ended questions were analyzed for themes, and descriptive statistics were used to provide insight into participant demographics. Information on the impressions, perceptions, and opportunities related to clinician involvement in design projects was collected from nurses, architects, interior designers, and construction managers. Qualitative analysis revealed themes of clinician input, organizational dynamics, and a variety of communication strategies to be the most frequently mentioned elements of successful interprofessional collaboration. This study validates the need to include clinician input in the design process, to consider the importance of organizational dynamics on design team functioning, and to incorporate effective communication strategies during design and construction projects.

  2. AN ACD DIAGRAM DEVELOPED FOR SIMULATING A BRIDGE CONSTRUCTION OPERATION

    Directory of Open Access Journals (Sweden)

    Fahimeh Zaeri

    2014-12-01

    Full Text Available Success in the performance of construction projects can be substantially enhanced if plans are formulated more realistically, ahead of time. Planning includes identifying project activities, required resources, interdependencies, and also recognizing the uncertainties in the duration of activities. Inherent features of construction projects, such as high repetition, complexity and uniqueness on the one hand, and advances in technology and methodologies on the other, create more difficulties in planning construction delivery. This is true for bridge operations. This study presents an innovative incremental beam launching method with twin truss gantry. This construction method has significant advantages in terms of cost and speed of performance, but increases the level of planning and management required for the bridge operation. Further, because of the newness of the method, no specific Work Breakdown Structure nor conceptual framework has been developed as yet. The aim of the current study is to explore the use of a simulation-based tool (EZStrobe to facilitate the planning and management of a bridge construction operation (case study. The process followed in the development of a conceptual framework for the case study project is described. An Activity Cycle Diagram is produced alongside the conceptual framework and process models, with the intent of illustrating the key steps in the simulation modelling method. The developed models could assist in scheduling and controlling inherent construction features such as uncertainties, complexities, and repetitions in bridge construction projects, consequently improving their delivery.

  3. Factors contributing to the waste generation in building projects of Pakistan

    International Nuclear Information System (INIS)

    Memon, N.A.; Memon, F.A.

    2016-01-01

    Generation of construction waste is a worldwide issue that concerns not only governments but also the building actors involved in construction industry. For developing countries like Pakistan, rising levels of waste generation, due to the rapid growth of towns and cities have become critical issue. Therefore this study is aimed to detect the factors, which are the main causes of construction waste generation. Questionnaire survey has been conducted to achieve this task and RIW (Relative Importance Weight) method has been used to analyze the results of this study. The important factors contributing to the generation of construction as identified in this study are: frequent changes/ revision in design during construction process; poor scheduling; unavailability of storage; poor workmanship; poor layout; inefficient planning and scheduling of resources and lack of coordination among supervision staff deployed at site. Based on the identified factors, the study also has presented some suggestions for the reduction of construction waste in building construction projects of Pakistan. (author)

  4. Construction Project Success ranking through the Data Envelopment Analysis

    Directory of Open Access Journals (Sweden)

    Mazyar Zahedi-Seresht

    2014-09-01

    Full Text Available The purpose of this paper is to rank construction projects' success in a post delivery phase. To attain this objective, a data envelopment analysis (DEA approach is used. The model's output is a project success index which is calculated based on five project success criteria. These criteria which are determined by a two-round Delphi questionnaire survey are time performance, cost performance, quality, HSE, and customer satisfaction. The input factors which have effects on the output measures are Organizational Sponsorship, Project Manager Competency, Customer Organization, Project Operational Environment and Organizational Experience. The tool adopted to determine these factors is questionnaire. This model is applied for 9 projects with different importance of output and input factors and the reasonable result is achieved for ranking these projects.

  5. causes of conflicts in construction projects in nigeria

    African Journals Online (AJOL)

    user

    NIGERIA. 2 DEPARTMENT OF ARCHITECTURE AND CIVIL ENGINEERING, CITY ... Thus, this study was aimed at identifying and assessing causes of conflicts in Nigeria .... technical specification, government intervention, ..... scale construction projects: A case study,” Constr. ... study of Bygga Villa, a Swedish triple helix e-.

  6. Design and Construction Solutions in the Accurate Realization of NCSX Magnetic Fields

    International Nuclear Information System (INIS)

    Heitzenroeder, P.; Dudek, Lawrence E.; Brooks, Arthur W.; Viola, Michael E.; Brown, Thomas; Neilson, George H.; Zarnstorff, Michael C.; Rej, Donald; Cole, Michael J.; Freudenberg, Kevin D.; Harris, J.H.; McGinnis, Gary

    2008-01-01

    The National Compact Stellarator Experiment, NCSX, is being constructed at the Princeton Plasma Physics Laboratory (PPPL) in partnership with the Oak Ridge national Laboratory. The goal of NCSX is to provide the understanding necessary to develop an attractive, disruption free, steady state compact stellarator based reactor design. This paper describes the recently revised designs of the critical interfaces between the modular coils, the construction solutions developed to meet assembly tolerances, and the recently revised trim coil system that provides the required compensation to correct for the 'as built' conditions and to allow flexibility in the disposition of as-built conditions. In May, 2008, the sponsor decided to terminate the NCSX project due to growth in the project's cost and schedule estimates. However significant technical challenges in design and construction were overcome, greatly reducing the risk in the remaining work to complete the project

  7. Effectiveness of Quality Management System (QMS) on Construction Projects

    OpenAIRE

    Behnam Neyestani

    2016-01-01

    Quality management system (QMS) provides generic guidance and requirements for establishing an appropriate quality management procedure, in order to lower cost, increase productivity, customer's satisfaction, and market share in the organizations since the last two-decade. In construction industry, it can assist the companies to achieve successfully their objectives, and ensure that all phases of construction project consistently meet client's requirements (need). The main aim of this article...

  8. Common risks affecting time overrun in road construction projects in Palestine: Contractors’ perspective

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2013-06-01

    Full Text Available The construction sector is one of the key economic sectors and is the main force motivating the Palestinian national economy. However, it suffers from number of problems that affect time, cost and quality performances. This study aims at identifying the common risks affecting time overrun in road construction projects in the West Bank in Palestine from contractors’ viewpoint. 45 factors that might cause delays of road construction projects were defined through a detailed literature review. A questionnaire survey was performed to rank the considered factors in terms of severity and frequency. The analysis of the survey indicated that the top risks affecting time overrun in road construction projects in Palestine are: financial status of the contractors, payments delay by the owner, political situation, segmentation of the West Bank, poor communication between construction parties, lack of equipment efficiency, and high competition in bids.

  9. Challenges of the expansive use of Building Information Modeling (BIM in construction projects

    Directory of Open Access Journals (Sweden)

    Hannele Kerosuo

    2015-06-01

    Full Text Available Building information modeling (BIM is an emerging modeling technology which challenges existing work procedures and practices in the construction industry. In this article we study the challenges, problems and potential expansions of BIM as a tool in the design, construction and operation of buildings. For this purpose the interfaces between different parties are examined in Finnish construction projects. The methodological approach of the study is cultural-historical activity theory, according to which a new artifact becomes a mediating instrument when the participatory subjects reconfigure the entire activity. The implementation of BIM is now spreading from the design activity to other phases of the construction projects, but its use is still limited in the projects' other three interfaces. BIM is an evolving set of software developed for various purposes which is locally 'combined' to fit the circumstances and capabilities of the stakeholders of the construction process.

  10. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  11. Causes and remedial measures for construction delays: a case study of pakistan

    International Nuclear Information System (INIS)

    Ali, T.H.; Memon, N.A.

    2009-01-01

    Delays are the most common event that influence the time performance and increase the cost of projects. This paper analyze causes of various delays experienced by three large construction projects in public sector and subsequently to recommend the corrective actions necessitated to safeguard future construction projects from suffering these delays, which result in enormous cost and time over-runs, undermining projects economic viability. The case-study approach has been employed as research method, to analyze construction delays, followed by categorizing them in view of their source. The method employed to collect data included interviews, questionnaire surveys, and analysis of project documents including monthly progress reports, minutes of meeting, and details of correspondence held between the project participants. The data collected was minutely analyzed to identify different delays, and their underlying causes encountered during execution of projects. The analysis reveals serious lapses on part of projects planners, for their failure to take care of the inevitable contingencies (unexpected situations), while conceptualizing projects by resorting to proactive planning at the very outset, incorporating adequate buffers in the projects budgeted costs, and timeframes, to ensure projects economic viability in any eventuality. The failure of owners to establish key performance indicators, followed by their inability in tracking down the indicators, worsened the situation, resulting in projects execution lagging far behind original schedules of construction activities with their estimated costs. (author)

  12. Quality during construction

    International Nuclear Information System (INIS)

    Rogers, C.B.

    1977-01-01

    This paper outlines the quality assurance program used by Bechtel Corp. in constructing Nuclear Power Plants. As a tool for scheduling and visualizing situations during construction, power plant scale models are used. The use of models, preplanning, detail scheduling, and early development of procedures and inspection plans, have all contributed to a lower cost integrated quality program. Quality control and quality assurance are built in, thus satisfying the regulatory requirements

  13. Benefits of Building Information Modelling in the Project Lifecycle: Construction Projects in Asia

    Directory of Open Access Journals (Sweden)

    Jian Li

    2014-08-01

    Full Text Available Building Information Modelling (BIM is a process involving the creation and management of objective data with property, unique identity and relationship. In the Architecture, Engineering and Construction (AEC industry, BIM is adopted a lot in the lifecycle of buildings because of the high integration of information that it enables. Four-dimensional (4D computer-aided design (CAD has been adopted for many years to improve the construction planning process. BIM is adopted throughout buildings' lifecycles, in design, construction and operation. This paper presents five large-scale public and financial projects that adopt BIM in the design, construction and operational phases. Different uses of BIM are compared and contrasted in the context of the separate backgrounds. It is concluded that productivity is improved where BIM is used to enable easy sharing and integration of information and convenient collaboration.

  14. Study on evaluation of construction reliability for engineering project based on fuzzy language operator

    Science.gov (United States)

    Shi, Yu-Fang; Ma, Yi-Yi; Song, Ping-Ping

    2018-03-01

    System Reliability Theory is a research hotspot of management science and system engineering in recent years, and construction reliability is useful for quantitative evaluation of project management level. According to reliability theory and target system of engineering project management, the defination of construction reliability appears. Based on fuzzy mathematics theory and language operator, value space of construction reliability is divided into seven fuzzy subsets and correspondingly, seven membership function and fuzzy evaluation intervals are got with the operation of language operator, which provides the basis of corresponding method and parameter for the evaluation of construction reliability. This method is proved to be scientific and reasonable for construction condition and an useful attempt for theory and method research of engineering project system reliability.

  15. Facilitating Client Value Creation in the Conceptual Design Phase of Construction Projects

    DEFF Research Database (Denmark)

    Thyssen, Mikael Hygum; Emmitt, Stephen; Bonke, Sten

    2009-01-01

    If client values are not fully understood in a construction project it is likely to result in either low fulfilment of client expectations or multiple design alterations during the project process which lead to additional costs and frustration among the project participants. However...... by the fact that the delivery team, which is responsible for understanding and delivering client value, is made up of even more different parties. The paper reports the initial outcome of a joint research project between academics and practitioners, which aims to develop a practical workshop model...... that incorporates client values into the conceptual design of construction projects. The workshop model draws on value management and lean thinking as underlying principles in an attempt to address the ambiguous concept of ‘value’....

  16. The algorithm for duration acceleration of repetitive projects considering the learning effect

    Science.gov (United States)

    Chen, Hongtao; Wang, Keke; Du, Yang; Wang, Liwan

    2018-03-01

    Repetitive project optimization problem is common in project scheduling. Repetitive Scheduling Method (RSM) has many irreplaceable advantages in the field of repetitive projects. As the same or similar work is repeated, the proficiency of workers will be correspondingly low to high, and workers will gain experience and improve the efficiency of operations. This is learning effect. Learning effect is one of the important factors affecting the optimization results in repetitive project scheduling. This paper analyzes the influence of the learning effect on the controlling path in RSM from two aspects: one is that the learning effect changes the controlling path, the other is that the learning effect doesn't change the controlling path. This paper proposes corresponding methods to accelerate duration for different types of critical activities and proposes the algorithm for duration acceleration based on the learning effect in RSM. And the paper chooses graphical method to identity activities' types and considers the impacts of the learning effect on duration. The method meets the requirement of duration while ensuring the lowest acceleration cost. A concrete bridge construction project is given to verify the effectiveness of the method. The results of this study will help project managers understand the impacts of the learning effect on repetitive projects, and use the learning effect to optimize project scheduling.

  17. Rural Residents’ Perception of Construction Project Delays in Pakistan

    Directory of Open Access Journals (Sweden)

    Shahid Hussain

    2017-11-01

    Full Text Available The construction industry is one of the key sectors that facilitate sustainable economic and social development in the region. Currently, community development mechanisms are adopted by many developed and developing nations, aimed at enhancing economic growth and quality of life along with social welfare of the local community. This study reviews the rural residents’ perception of public construction project delays and aims to explore economic and social challenges confronted by residents, especially in rural areas in Pakistan. A questionnaire with 26 factors identified from the literature was sent to rural educated residents. Through a questionnaire survey, the opinions of rural residents were sought and tested. Based on 366 (73% valid responses, this study examined the socio-economic influencing factors. The findings of the study revealed that problems faced while traveling, increase the price of consumer goods, high transportation costs, lack of educational opportunities, more expenditures on education, and barriers to primary healthcare access were the top most important factors. Research results confirmed that the delays in construction projects negatively affect the socio-economic conditions of the rural community, which directly influence the rural dwells’ sustainable life. The research findings suggest that the practitioners in public sector organization make sure to execute the project on time and within the quality. Otherwise, it has negative socio-economic implications for the rural community.

  18. Declarative Modeling for Production Order Portfolio Scheduling

    Directory of Open Access Journals (Sweden)

    Banaszak Zbigniew

    2014-12-01

    Full Text Available A declarative framework enabling to determine conditions as well as to develop decision-making software supporting small- and medium-sized enterprises aimed at unique, multi-project-like and mass customized oriented production is discussed. A set of unique production orders grouped into portfolio orders is considered. Operations executed along different production orders share available resources following a mutual exclusion protocol. A unique product or production batch is completed while following a given activity’s network order. The problem concerns scheduling a newly inserted project portfolio subject to constraints imposed by a multi-project environment The answers sought are: Can a given project portfolio specified by its cost and completion time be completed within the assumed time period in a manufacturing system in hand? Which manufacturing system capability guarantees the completion of a given project portfolio ordered under assumed cost and time constraints? The considered problems regard finding a computationally effective approach aimed at simultaneous routing and allocation as well as batching and scheduling of a newly ordered project portfolio subject to constraints imposed by a multi-project environment. The main objective is to provide a declarative model enabling to state a constraint satisfaction problem aimed at multi-project-like and mass customized oriented production scheduling. Multiple illustrative examples are discussed.

  19. An Adaptive Large Neighborhood Search Algorithm for the Resource-constrained Project Scheduling Problem

    DEFF Research Database (Denmark)

    Muller, Laurent Flindt

    2009-01-01

    We present an application of an Adaptive Large Neighborhood Search (ALNS) algorithm to the Resource-constrained Project Scheduling Problem (RCPSP). The ALNS framework was first proposed by Pisinger and Røpke [19] and can be described as a large neighborhood search algorithm with an adaptive layer......, where a set of destroy/repair neighborhoods compete to modify the current solution in each iteration of the algorithm. Experiments are performed on the wellknown J30, J60 and J120 benchmark instances, which show that the proposed algorithm is competitive and confirms the strength of the ALNS framework...

  20. Project for construction of a new nuclear unit in Armenia

    International Nuclear Information System (INIS)

    2010-01-01

    WorleyParsons Project Description Scope of work: Management Services for Implementation of the Project on Construction of New Nuclear Unit(s) in the Republic of Armenia. Client: Ministry of Energy and Natural Resources (MENR), Republic of Armenia •Contract signed on 29 of May 2009 •Project divided into 4 Phases. Addendum 1 covers phase I and II signed on 27 of July. Contract entered into force 7 of August